Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: agreed upon at appraisal 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: first 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1000,000 First three packages 2. NCB (Goods) Above US$ 100,000 First contract 5. (Non-Consultant Services) Below US$ 1000,000 First three packages [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 4. Reference to (if any) Project Operational/Procurement Manual: 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) G.Sev Several IT 1.35 No Prior (Goods) eral equipment million packages for establishin g Consumer Departmen t and Microfinan ce Unit III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 0.2 Million 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million C.IND.Seve Several 0.25 1 Post ral Contracts million supporting developmen t of the institutional framework for microfinance C.QCBS.2 Enhance 0.35 1 Prior consumer million protection mechanism PROCUREMENT Egypt, Arab Republic of : Inclusive Regulations for Microfinance PLAN General Information Country: Egypt, Arab Republic of Bank’s Approval Date of the Original Procurement Plan: 2017-06-20 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149677 GPN Date: Project Name: Inclusive Regulations for Microfinance Loan / Credit No: TF / 17864 Egyptian Financial Supervisory Authority Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FRA-18 / Update of the Personnel and Payroll Program TF / 17864 Post Direct Selection Direct 3,821.66 Completed 2018-09-30 2018-10-01 2018-11-13 2018-11-13 2018-12-02 2018-12-30 2021-12-01 2019-01-01 (HITS DNA) FRA-19 / Update the electronic archive program TF / 17864 Post Direct Selection Direct 1,751.59 Completed 2018-09-30 2018-10-01 2018-11-12 2018-11-13 2018-12-02 2018-12-30 2021-12-01 2019-03-03 (JUPITER) FRA-GO-SH-1 / Tech. facilities & Supplies ( Request for Single Stage - One TF / 17864 Post Limited 30,249.30 Completed 2019-05-01 2019-06-09 2019-06-05 2019-07-25 2019-12-02 2019-07-29 Conference System) for the Quotations Envelope new training center FRA-GO-SH-3 / Tech. facilities & Supplies ( Sound Request for Single Stage - One TF / 17864 Post Limited 12,377.93 Completed 2019-04-28 2019-06-09 2019-06-02 2019-07-28 2019-11-29 2019-07-31 Systems) for the new training Quotations Envelope center FRA-GO-SH-4 / Tech. facilities & Supplies ( Projector Request for Single Stage - One TF / 17864 Post Limited 30,543.42 Completed 2019-05-01 2019-06-09 2019-06-12 2019-06-26 2019-12-09 2019-07-11 System) for the new training Quotations Envelope center FRA-GO-SH-2 / MIS Software, Design and Single Stage - Two Implementation of EFSA TF / 17864 Post Request for Bids Limited 6,138.11 Completed 2016-03-01 2016-04-21 2016-10-24 2016-10-24 2016-12-21 2016-12-21 2017-05-23 2017-05-23 2017-06-22 2017-06-22 2019-09-30 2018-01-18 Envelope Microfinance Information and Reporting System FRA-GO-SH-5 / Furnitures Request for Single Stage - One TF / 17864 Post Limited 0.00 Canceled 2019-04-23 2019-05-30 2019-11-26 for the new training center Quotations Envelope EG-FRA-119037-GO-RFQ / Financial Inclusion Training Request for Single Stage - One Center Main Display Screen TF / 17864 Post Limited 80,000.00 Completed 2019-06-16 2019-06-16 2019-07-04 2019-07-07 2019-07-07 2019-07-11 Quotations Envelope with Video signal cabling & installation accessories FRA- GO-45 / FRA BACKUP INFRASTRUCTURE SOLUTIONS TF / 17864 Post Direct Selection Direct 0.00 Canceled 2020-04-13 2020-04-07 2020-04-15 2020-04-09 2020-04-19 2020-07-03 SYSTEM (Verits) FRA- GO-46 / RAM FOR Request for Single Stage - One TF / 17864 Post Limited 2,678.93 Completed 2020-05-25 2020-06-25 2020-06-30 2020-07-09 2020-12-27 2020-07-21 UPGRADING DELL SERVERS Quotations Envelope FRA-GO-49 / FRA BACKUP Single Stage - One INFRASTRUCTURE SOLUTIONS TF / 17864 Post Request for Bids Open - National 0.00 Canceled 2020-08-25 2020-08-30 2020-10-11 2020-11-10 2020-12-15 2021-06-13 Envelope SYSTEM NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LEASE-001 / Rent premises TF / 17864 Prior Direct Selection Direct 78,085.99 Signed 2015-04-01 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Consultant IC/EFSA/2015 / procurement TF / 17864 Prior Qualification Open - International 10,000.00 Terminated 2015-08-06 2015-08-10 consultant Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FRA-CS-INDV-25 / Mohamed Individual Mohamed Taha, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-25 2018-12-16 2019-08-01 2018-12-23 2018-12-23 2019-01-01 2019-01-01 2020-06-30 Inspections & Compliance Selection Specialist Page 1 FRA-CS-INDV-26 / Hossam Individual Fathy Gamal El Din, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-23 2018-12-06 2018-12-23 2018-12-16 2019-01-01 2018-12-30 2020-06-30 Junior Inspections & Selection Compliance Specialist FRA-CS-INDV-27 / Reem Individual Issam Mohammed, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-16 2018-12-16 2019-01-01 2018-12-30 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-28 / Sarah Individual Mohamed Morsy, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-16 2018-12-06 2018-12-23 2018-12-23 2019-01-01 2018-12-31 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-29 / Hoda Individual Abdel-Hamid Hermach, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-16 2018-12-16 2018-12-24 2019-01-01 2019-01-01 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-30 / Individual Mohammed Ramadan Abdul TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-16 2018-12-16 2019-01-01 2018-12-30 2020-06-30 Aziz, FRA's Inspections & Selection Compliance Specialist FRA-CS-INDV-31 / Mostafa Individual Said Ibrahim, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-16 2019-10-06 2018-12-23 2018-12-23 2019-01-01 2018-12-31 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-32 / Amira Individual Karam Sabbak, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-16 2018-12-06 2018-12-23 2018-12-16 2018-12-30 2018-12-31 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-33 / Individual Mohammed Reza Mohammed, TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-16 2018-12-16 2019-01-01 2019-01-01 2020-06-30 FRA's Inspections & Selection Compliance Specialist Individual FRA-CS-INDV-34 / Mirna TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-16 2018-12-16 2018-12-23 2018-12-23 2019-01-01 2019-01-01 2020-06-30 Ashraf Fathi Selection FRA-CS-INDV-35 / Fatima Individual Mohammed Jaber, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-16 2018-12-16 2018-12-16 2018-12-23 2018-12-23 2019-01-01 2019-01-01 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-36 / Amira Individual Fawzi Mohamed, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-16 2018-12-16 2018-12-23 2018-12-23 2019-01-01 2019-01-01 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-37 / Alaa Individual Nasser Sayed, FRA's TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-16 2018-12-06 2018-12-23 2018-12-19 2019-01-01 2018-12-31 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-38 / Bassam Individual Hussam El - Din Abdel - TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-16 2018-12-16 2019-01-01 2018-12-31 2020-06-30 Hamd, FRA's Inspections & Selection Compliance Specialist FRA-CS-INDV-39 / Samar Individual Ibrahim Hefnawi, Junior TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-20 2018-12-20 2019-01-01 2019-01-01 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-40 / Israa Individual Abdel Azim Ahmed, Junior TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-16 2018-12-16 2019-01-01 2018-12-31 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-41 / Fatima Al- Individual Zahra Abd Al-Badea, Junior TF / 17864 Post Consultant Limited 6,140.00 Completed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-12 2018-12-16 2019-01-01 2018-12-30 2020-06-30 2021-03-01 Inspections & Compliance Selection Specialist FRA-CS-INDV-42 / Shadwa Individual Alaa Eddin Mahmoud, Junior TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-16 2018-12-16 2019-01-01 2019-01-01 2020-06-30 Inspections & Compliance Selection Specialist FRA-CS-INDV-43 / Aya Ali Individual Mohamed, Junior Inspections TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-16 2018-12-16 2019-01-01 2019-01-01 2020-06-30 & Compliance Specialist Selection FRA-CS-INDV-44 / Sarah Individual Kamal Riad, Junior Inspections TF / 17864 Post Consultant Limited 6,140.00 Signed 2018-12-02 2018-12-02 2018-12-07 2018-12-06 2018-12-16 2018-12-07 2019-01-01 2018-12-31 2020-06-30 & Compliance Specialist Selection FRA-CS-INDV-1 / MF Project Individual deputy Manager (Ahmed TF / 17864 Post Consultant Limited 4,758.26 Signed 2016-08-01 2016-08-01 2016-08-06 2016-08-06 2016-08-21 2016-08-21 2016-09-01 2016-09-01 2020-06-30 Hussein Abdelgawad) Selection FRA-CS-INDV-4 / Specialist Individual of Analysis and Control TF / 17864 Post Consultant Limited 2,647.72 Signed 2015-06-01 2015-06-01 2015-06-06 2015-06-06 2015-06-16 2015-06-16 2015-07-12 2015-07-12 2020-06-30 (Ahmed Mohamed Ahmed Selection Abdel Aati) FRA-CS-INDV-5 / Individual Compliance & Inspection TF / 17864 Post Consultant Limited 2,283.61 Completed 2015-09-22 2015-09-22 2015-09-27 2015-09-27 2015-10-18 2015-10-18 2015-11-11 2015-11-11 2020-06-30 2019-10-31 Specialist (Hassan Mohamed Selection Abdel Latif Hassan) FRA-CS-INDV-6 / Individual Compliance & Inspection TF / 17864 Post Consultant Limited 1,734.26 Signed 2016-07-03 2016-07-03 2016-07-08 2016-07-08 2016-07-29 2016-07-29 2016-09-01 2016-09-01 2017-02-28 Specialist (Anas Sobhy Ahmed Selection El-Erian) Page 2 FRA-CS-INDV-7 / Individual Compliance & Inspection TF / 17864 Post Consultant Limited 1,737.53 Signed 2016-07-03 2016-07-03 2016-07-08 2016-07-08 2016-07-29 2016-07-29 2016-09-01 2016-09-01 2020-06-30 Specialist (Hisham Abdel- Selection Maleem Abdel-Kareem) FRA-CS-INDV-8 / Individual Compliance & Inspection TF / 17864 Post Consultant Limited 776.72 Signed 2018-10-01 2018-10-01 2018-10-06 2018-10-06 2018-10-16 2018-10-16 2018-11-01 2018-11-01 2020-06-30 Specialist (Mina Reda Nassif) Selection FRA-CS-INDV-9 / Individual Compliance & Inspection TF / 17864 Post Consultant Limited 1,040.39 Completed 2017-11-07 2017-11-07 2017-11-12 2017-11-12 2017-12-03 2017-12-03 2018-01-15 2018-01-15 2020-06-30 2019-12-31 Specialist (Assem Eid Selection Mahmoud) FRA-CS-INDV-10 / training Individual and awareness Specialist TF / 17864 Post Consultant Limited 962.94 Signed 2017-12-11 2017-12-11 2017-12-16 2017-12-07 2018-01-06 2018-01-06 2018-02-01 2018-02-01 2020-06-30 (Safaa Mohamed Abdoun Selection Hussein) FRA-CS-INDV-11 / Individual Compliance & Inspection TF / 17864 Post Consultant Limited 815.05 Signed 2018-05-27 2018-05-27 2018-06-01 2018-05-30 2018-06-17 2018-06-17 2018-07-01 2018-07-01 2020-06-30 Specialist (Abbas Abdel Selection Moneim Abbas Al - Saidi) FRA-CS-INDV-12 / Individual Compliance & Inspection TF / 17864 Post Consultant Limited 985.18 Signed 2018-02-01 2018-02-01 2018-02-06 2018-02-06 2018-02-19 2018-02-19 2018-03-01 2018-03-01 2020-06-30 Specialist (Mohammed Ayman Selection Kamal Al - Kurdi) FRA-CS-INDV-13 / Individual Procurment & Adm Specialist TF / 17864 Post Consultant Limited 7,000.00 Signed 2019-01-01 2019-01-01 2019-01-06 2019-01-08 2019-01-15 2019-01-15 2019-02-01 2019-02-01 2020-06-30 (Mohamed Nabil Zaki) Selection FRA-CS-INDV-14 / Individual Administrative Affairs Clerck TF / 17864 Post Consultant Limited 1,070.08 Signed 2015-02-26 2015-02-26 2015-03-03 2015-03-03 2015-03-24 2015-03-24 2015-04-26 2015-04-26 2020-06-30 (Hashem Ahmed Hashim) Selection FRA-CS-INDV-15 / Support Individual Services Assitant (Abdullah TF / 17864 Post Consultant Limited 540.00 Signed 2016-08-01 2016-08-01 2016-08-06 2016-08-07 2016-08-16 2016-08-16 2016-09-19 2016-10-19 2020-06-30 Abdulrahman Mohammed Al - Selection Sadawi) FRA-CS-INDV-16 / Support Individual Services Assitant (Alaa TF / 17864 Post Consultant Limited 640.00 Signed 2016-08-01 2016-08-01 2016-08-06 2016-08-07 2016-08-27 2016-09-11 2016-09-19 2016-09-19 2020-06-30 mahmood mahmood) Selection FRA-CS-INDV-17 / Support Individual Services Assitant (Mohammed TF / 17864 Post Consultant Limited 540.00 Signed 2016-08-01 2016-08-01 2016-08-06 2016-08-07 2016-08-27 2016-08-27 2016-09-19 2016-10-19 2020-04-30 Jnaidi Jad Amira) Selection FRA-CS-INDV-18 / M&E Individual Specialist (Ms. Sara TF / 17864 Post Consultant Limited 3,433.77 Signed 2017-10-01 2017-10-01 2017-10-06 2017-10-06 2017-10-16 2017-10-16 2017-11-01 2017-11-01 2020-06-30 Eldegheidi) Selection FRA-CS-CDS-1 / Senior Advisor Microfinance TF / 17864 Post Direct Selection Direct 2,158.73 Signed 2014-11-15 2014-11-15 2014-11-25 2014-11-25 2015-01-01 2015-01-01 2015-12-31 Regulatory Framework (Mr. Abdel Hamid Ibrahim) FRA-CS-CDS-11 / Insurance Advisor (Mr. Hesham Ibrahim) TA under our MF Project to cover specifically the insurance sector. EFSA TF / 17864 Post Direct Selection Direct 2,178.27 Completed 2017-10-01 2017-10-01 2017-10-11 2017-10-14 2017-10-27 2017-10-26 2017-12-31 2021-01-21 currently needs to work on the following: • Drafting a new insurance law taking into consideration all the recent developments FRA-CS-CDS-2 / FRA's Advisor for legislation and TF / 17864 Post Direct Selection Direct 191.69 Signed 2017-10-01 2017-10-01 2017-10-15 2017-10-15 2017-11-01 2017-11-01 2018-12-31 drafting of lawsJudge (Mr. Mohamed Abed Elkerim) FRA-CS-CDS-3 / Consumer Protection Advisor (Dr. Shahira Fawzy) Local consulatnt under MF project for the Consumer Protection to guidance FRA TF / 17864 Post Direct Selection Direct 767.75 Signed 2018-04-01 2018-04-01 2018-04-11 2018-04-07 2018-05-01 2018-05-02 2018-12-31 team and design the needed framwork to support FRA efforts which aim to develop non banking financial markets In Egypt FRA-CS-CDS-4 / MFI Financial Reporting quality TF / 17864 Post Direct Selection Direct 9,000.00 Signed 2018-05-16 2018-05-16 2018-05-28 2018-05-28 2018-07-01 2019-07-01 2018-12-31 assurance consultant (Dr. Mohamed Yehia) FRA-CS-CDS-5 / Information Technology Advisor Eng. TF / 17864 Post Direct Selection Direct 1,406.65 Signed 2018-01-21 2018-01-21 2018-01-31 2018-01-31 2018-03-01 2018-03-01 2018-12-31 Tarek Fathy FRA-CS-CDS-6 / Information Technology Advisor MIS TF / 17864 Post Direct Selection Direct 1,904.76 Signed 2018-12-02 2018-12-02 2018-12-16 2018-12-16 2019-01-01 2019-01-01 2019-12-31 Sysytem Eng. Nael Abdelwahab FRA-CS-INDV-2 / Finance Individual Planning & General Support TF / 17864 Post Consultant Limited 1,533.55 Signed 2015-02-01 2015-02-01 2015-02-11 2015-02-11 2015-02-25 2015-02-25 2015-04-01 2015-04-01 2015-12-31 Services Manager (Hossam Selection Bashir) FRA-CS-INDV-3 / Head of Individual Micro Finance (Mr. Gamal TF / 17864 Post Consultant Direct 3,192.08 Signed 2015-01-01 2015-01-01 2015-01-11 2015-01-11 2015-02-01 2018-02-01 2015-03-01 2015-03-01 2015-12-31 Khalifa) Selection Page 3 FRA-CS-CDS-7 / Digital Transformation Advisor (Mrs. TF / 17864 Post Direct Selection Direct 952.38 Signed 2018-12-02 2018-12-02 2018-12-12 2018-12-12 2019-01-01 2019-01-01 2019-12-31 Asmaa Mahmoud Hosny) EG-EFSA-201452-CS-CDS / a consultant for drafting the TF / 17864 Post Direct Selection Direct 0.00 Under Review 2020-10-25 2020-09-15 2020-10-27 2020-11-01 2021-04-30 law of Futures Contracts Exchange (Samah adel) Page 4 PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, One WASH- Consolidated WASH Account (CWA) Project “Phase II”, P167794 Project Implementation agency: Water Development Commission (WDC) of the Ministry of Water, Irrigation and Energy (MoWIE) Date of the Procurement Plan: August 28, 2019 Period covered by this Procurement Plan: September 2019 to August 2020. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Section 33(1)(a) from 35-48 of the Proclamation Number 649/2009 of the Ethiopian Federal Government Procurement and Property Administration Proclamation, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. • Open Advertising of the procurement opportunity at the national level; • The procurement is open to eligible firms from any country; • The request for bids/Proposal documents shall require that bidders/proposers submitting Bids/Proposal present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the bank’s right to sanction and the Bank’s inspection and audit right; • Contracts with an appropriate allocation of responsibilities, risks and liabilities; • Application of Standstill period and Publication of contract award information; • Maintenance of records of the procurement process; and • The Bank has the right to review procurement documentation and activities. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is applicable for those contracts identified in the Procurement Plan; Works: Is applicable for those contracts identified in the Procurement Plan. Other Relevant Procurement Information. None PROCUREMENT Ethiopia : One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2020-03-11 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167794 GPN Date: 2019-12-06 Project Name: One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) Loan / Credit No: IDA / 64450 T Executing Agency(ies): IGRAY WRDB WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-TIGRAY WRDB-151604- CW-RFB / Civil work construction with supply and installation of Pipes ,Fittings Urban Water Supply, Under Single Stage - One 2021-04- and electro-mechanical IDA / 64450 Sanitation, and Hygiene Post Request for Bids Open - National 0.00 Implementat 2020-03-04 2020-04-01 2020-03-19 2020-04-18 2020-05-04 2020-05-18 2020-09-08 2020-06-28 Envelope 24 equipment's) forAdi Daero (Urban WASH) ion Town. Implementing Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-155372- CW-RFB / Drilling and pumping test of one Deep Urban Water Supply, Single Stage - One 2020-07- borehole for Adi Nebried IDA / 64450 Sanitation, and Hygiene Post Request for Bids Open - National 30,670.14 Signed 2020-02-05 2020-04-13 2020-02-20 2020-03-21 2020-05-13 2020-04-20 2020-07-08 2020-05-25 2020-08-17 Envelope 24 Town. (Urban WASH) Implementing Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-151608- CW-RFB / Expansion of water Urban Water Supply, Under supply system at Nebelet Single Stage - One 2020-09- IDA / 64450 Sanitation, and Hygiene Post Request for Bids Open - National 0.00 Implementat 2020-02-12 2020-04-16 2020-02-27 2020-03-28 2020-05-15 2020-04-27 2020-07-21 2020-06-01 town. Envelope 29 (Urban WASH) ion Implimenting Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-151627- CW-RFB / Construction of RPS (Civil work construction , supply and installation of Pipes and Fittings and Rural Water Supply, Under Single Stage - One 2021-04- electromechanical equipment) IDA / 64450 Sanitation, and Hygiene Post Request for Bids Open - National 0.00 Implementat 2020-02-24 2020-05-19 2020-03-10 2020-04-21 2020-06-23 2020-05-21 2020-10-10 2020-07-01 Envelope 07 at Kilite Awlealo Woreda (Rural WASH) ion (Dinwale Village) Implementing Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-151638- CW-RFB / Drilling and pumping test of Five Deep borehole for (Laelay Maychew Rural Water Supply, Under Single Stage - One 2020-09- #1, Laelay Adiyabo #1 , IDA / 64450 Sanitation, and Hygiene Post Request for Bids Open - National 153,863.83 Implementat 2020-02-14 2020-04-10 2020-02-29 2020-04-11 2020-05-20 2020-05-11 2020-07-08 2020-06-21 Envelope 19 hintalo wojerat (Gonka) (Rural WASH) ion #1,Tsegede #1 and Welkait#1) Implementing Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-155368- CW-RFB / Drilling of shallow wells and supply and installation of Afredeve hand pump at lot-1 Atsbi Wonberta and ofla Rural Water Supply, Under Single Stage - One 2020-11- woredas #10Shallow wells IDA / 64450 Sanitation, and Hygiene Post Request for Bids Open - National 156,058.70 Implementat 2020-03-28 2020-04-08 2020-04-12 2020-05-12 2020-05-08 2020-06-11 2020-07-07 2020-07-16 Envelope 13 lot-2Welkayit woreda #10 (Rural WASH) ion shallow wells lot-3Tsegede Woreda#10SW Implementing Agency- Tigray Water Resource Bureau ET-TIGRAY WRDB-151601- CW-RFB / Civil work construction with supply and installation of Pipes ,Fittings Urban Water Supply, Under Single Stage - One 2021-06- and electromechanical IDA / 64450 Sanitation, and Hygiene Post Request for Bids Open - National 0.00 Implementat 2020-02-07 2020-04-01 2020-02-25 2020-03-26 2020-05-07 2020-05-05 2020-09-22 2020-06-15 Envelope 15 equipments) for Wukro Maray (Urban WASH) ion Town. Implementing Agency- Tigray Water Resource Bureau ET-TIGRAY WRDB-232288- National CW-DIR / Construction of Procurement Rural Water Supply, Pending RPSs including supply and Document - 1 2022-01- IDA / 64450 Sanitation, and Hygiene Post Direct Selection Direct 0.00 Implementat 2021-04-30 2021-05-05 2021-05-22 Installation of Pipes and Envelope 27 (Rural WASH) ion Fittings and EME for Dinwale process (Non village by Tigray WRB Bank-SPD) ET-TIGRAY WRDB-232291- National CW-DIR / Construction of WSS Procurement Urban Water Supply, Pending including supply and Document - 1 2021-12- IDA / 64450 Sanitation, and Hygiene Post Direct Selection Direct 0.00 Implementat 2021-04-30 2021-05-05 2021-05-22 Installation of Pipes and Envelope 08 (Urban WASH) ion Fittings and EME for Adi Daero process (Non Town by Tigray WRB Bank-SPD) ET-TIGRAY WRDB-232292- National CW-DIR / Construction of WSS Procurement Urban Water Supply, Pending including supply and Document - 1 2022-05- IDA / 64450 Sanitation, and Hygiene Post Direct Selection Direct 0.00 Implementat 2021-04-30 2021-05-05 2021-05-22 Installation of Pipes and Envelope 22 (Urban WASH) ion Fittings and EME for Wukro process (Non Maray Town by Tigray WRB Bank-SPD) ET-TIGRAY WRDB-232293- National CW-DIR / Construction of WSS Procurement Urban Water Supply, Pending including supply and Document - 1 2022-02- IDA / 64450 Sanitation, and Hygiene Post Direct Selection Direct 0.00 Implementat 2021-04-30 2021-05-05 2021-05-22 installation of pipes and Envelope 16 (Urban WASH) ion fittings and EME for Chercher process (Non Town by Tigray WRDB Bank-SPD) Page 1 National ET-TIGRAY WRDB-232299- Procurement CW-DIR / Drilling of 30 Rural Water Supply, Pending Document - 1 2021-09- shallow wells including supply IDA / 64450 Sanitation, and Hygiene Post Direct Selection Direct 0.00 Implementat 2021-04-30 2021-05-05 2021-05-22 Envelope 19 & installation of hand pump in (Rural WASH) ion process (Non 4 lots by Tigray RWB Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-TIGRAY WRDB-232298- GO-DIR / Procurement of 7 Urban Water Supply, Pending generator and 6 pumps and 3 IDA / 64450 Sanitation, and Hygiene Post Direct Selection Direct 0.00 Implementati 2021-04-30 2021-05-05 2021-06-09 2021-09-07 switch boards by Tigray Water (Urban WASH) on Resources Bureau NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-TIGRAY WRDB-155393- CS-INDV / Selection and Individual Employment of Regional Institutional Strengthening Under IDA / 64450 Post Consultant Open 0.00 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2021-06-04 WASH Assistant coordinator and Project Management Implementation Selection by Tigray Water Resource Bureau. ET-TIGRAY WRDB-155455- CS-INDV / Recruitment of Individual Institutional Strengthening Under Monitoring and Evaluation IDA / 64450 Post Consultant Open 0.00 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2021-06-04 and Project Management Implementation Specialist by Tigray Water Selection Resource Bureau. ET-TIGRAY WRDB-155465- CS-INDV / Recuitement of Individual Institutional Strengthening Under Electromechanical Specialist IDA / 64450 Post Consultant Open 0.00 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2021-06-04 and Project Management Implementation by Tigray Water Resource Selection Bureau ET-TIGRAY WRDB-155475- CS-INDV / Recruitment of Individual Institutional Strengthening Technical Specialist (Engineer) IDA / 64450 Post Consultant Open 0.00 Canceled 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2021-06-04 and Project Management by Tigray Water Resource Selection Bureau ET-TIGRAY WRDB-155461- Individual CS-INDV / Recruitment of Institutional Strengthening IDA / 64450 Prior Consultant Open 0.00 Canceled 2020-04-20 2020-06-08 2020-06-29 2020-08-03 2023-08-03 Procurement specialist by and Project Management Selection Tigray Water Resource Bureau. ET-TIGRAY WRDB-191553- Individual CS-INDV / Recuitment of Institutional Strengthening Under IDA / 64450 Prior Consultant Open 0.00 2020-09-12 2020-10-31 2020-11-21 2020-12-26 2023-12-26 procurement specialist by and Project Management Implementation Selection Tigray Water Resource Bureau ET-TIGRAY WRDB-191557- CS-INDV / Recuitemnet of Individual Institutional Strengthening Under technical specialist (Engineer) IDA / 64450 Post Consultant Open 0.00 2020-09-12 2020-10-31 2020-11-21 2020-12-26 2021-12-26 and Project Management Implementation by Tigray Water Resource Selection Bureau ET-TIGRAY WRDB-232308- Individual CS-INDV / Recruitment of Institutional Strengthening Pending IDA / 64450 Post Consultant Limited 0.00 2021-05-05 2021-05-10 2021-05-25 2021-06-25 2022-06-25 Technical Specialist (Engineer) and Project Management Implementation Selection by Tigray WRB ET-TIGRAY WRDB-232310- Individual Institutional Strengthening Pending CS-INDV / Recruitment of IDA / 64450 Post Consultant Limited 0.00 2021-05-05 2021-05-10 2021-05-31 2021-07-05 2022-07-05 and Project Management Implementation Social Safeguard by Tigray Selection WRB ET-TIGRAY WRDB-232311- Individual CS-INDV / Recruitment of Institutional Strengthening Pending IDA / 64450 Post Consultant Limited 0.00 2021-05-05 2021-05-10 2021-05-31 2021-07-05 2022-07-05 Procurement specialist by and Project Management Implementation Selection Tigray WRB Page 2 Nigeria For APPEALSP PROCUREMENT PLAN (Textual Part) Project information: [Nigeria] [Agro-Processing, Productivity Enhancement and Livelihood Improvement Support Project] (P53390) Project Implementation agency: [Federal Ministry of Agriculture and Rural Development] Date of the Procurement Plan: [October 25, 2018] Period covered by this Procurement Plan: [October 25, 2018 to December 2018] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works).Not Applicable. Goods: is not applicable Works: is not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable Other Relevant Procurement Information. The project will use the CDD procurement under this project. CDD manual will be produced by the project. PROCUREMENT Nigeria : Agro-Processing, Productivity Enhancement and Livelihood Improvement Support Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2019-04-26 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P148616 GPN Date: Project Name: Agro-Processing, Productivity Enhancement and Livelihood Improvement Support Project Loan / Credit No: IDA / 59930 LAGOS APPEALS Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned APPEALSP-LGSCO-CW-01 / Under Renovation of Office, Project Management and Request for Single Stage - One 2020-01- IDA / 59930 Post Limited 27,470.00 27,514.10 Implementat 2019-05-11 2019-05-07 2019-07-06 2019-06-13 Conference Room & Training Coordination Quotations Envelope 02 ion Hall NG-LAGOS APPEALS-158867- CW-RFB / Construction/rehabilitation of Infrastructure Support to Single Stage - Two 2021-07- IDA / 59930 Post Request for Bids Open - National 877,780.00 0.00 Canceled 2020-08-10 2020-08-15 2020-09-26 2020-12-09 2021-01-13 7.9 km Farm Access Roads Agribusiness Clusters Envelope 12 (3.8Km at Igbodu, Epe; 4.1 Km at Erikorodo -Phase 1) NG-LAGOS APPEALS-235890- Request for Bids - Pending CW-RFB / Infrastructure Support to Single Stage - One Small Works SPD 2022-03- IDA / 59930 Post Request for Bids Open - National 3,966,280.00 0.00 Implementat 2021-05-27 2021-06-01 2021-07-13 2021-08-12 2021-09-16 Construction/Rehabilitation of Agribusiness Clusters Envelope (1 envelope 15 ion Farm Access Road process) NG-LAGOS APPEALS-235891- Request for Bids - Pending CW-RFB / Infrastructure Support to Single Stage - One Small Works SPD 2022-03- IDA / 59930 Post Request for Bids Open - National 458,333.00 0.00 Implementat 2021-06-08 2021-06-13 2021-07-25 2021-08-24 2021-09-28 Construction/Rehabilitation of Agribusiness Clusters Envelope (1 envelope 27 ion 3 No.s of Aggregation Centers process) NG-LAGOS APPEALS-235893- Primary processing, Value Request for Bids - Pending CW-RFB / Establishment of 12 Addition, Post-Harvest Single Stage - One Small Works SPD 2022-03- IDA / 59930 Post Request for Bids Open - National 1,833,333.00 0.00 Implementat 2021-06-08 2021-06-13 2021-07-25 2021-08-24 2021-09-28 No.s Cottage Processing Management and Women & Envelope (1 envelope 27 ion Centers Youth Empowerment process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual APPEALSP-LGSCO-GO-01 / Production of Information, Education &Communication Project Management and Request for Single Stage - One materials / Knowledge IDA / 59930 Post Limited 8,240.00 14,793.04 Signed 2019-05-12 2019-08-05 2019-07-07 2019-08-26 2020-01-03 2020-03-25 Coordination Quotations Envelope sharing materials (Fact sheets, Newsletters, leaflets, handbills, manuals, briefs etc APPEALSP-LGSCO-GO-02 / Procurement of Communication equipment; (1)High Megapixel photo Technical Assistance, Request for Single Stage - One camera, (2)HD Professional IDA / 59930 Knowledge Management and Post Limited 4,330.00 174,430.32 Signed 2019-05-11 2019-05-24 2019-07-06 2019-06-20 2020-01-02 2019-08-27 Quotations Envelope Camera, (3) Medium PAS Communication (1);(4) Big Movable PAS(1),(5) Projector and Screen, (6) Media Mobile device APPEALSP-LGSCO-GO-03 / Technical Assistance, Request for Single Stage - One Production of Promotional IDA / 59930 Knowledge Management and Post Limited 10,990.00 10,877.06 Signed 2019-05-12 2019-05-05 2019-07-07 2019-07-02 2020-01-03 2019-09-06 Quotations Envelope items & Bill Boards/Sign posts Communication APPEALSP-LGSCO-GO-04 / Procurement of Office Furniture: 20 Executive Chairs Project Management and Request for Single Stage - One IDA / 59930 Post Limited 13,740.00 13,713.66 Signed 2019-04-27 2019-05-03 2019-06-22 2019-06-11 2019-12-19 2019-07-19 and Tables; Office fittings (e.g Coordination Quotations Envelope curtains,window blind,railings etc) APPEALSP-LGSCO-GO-05 / Procurement of Electrical Equipment and Appliances, 6 Infrastructure Support to Request for Single Stage - One units of 2HP Airconditioners IDA / 59930 Post Limited 18,930.00 5,099.93 Completed 2019-04-29 2019-04-30 2019-06-24 2019-05-31 2019-12-21 2019-09-06 Agribusiness Clusters Quotations Envelope for the training Hall, 30 units of fanS, calculators and Casting machine. APPEALSP-LGSCO-GO-06 / Provision of Alternative Source Infrastructure Support to Request for Single Stage - One of Energy for SCO (Inverter IDA / 59930 Post Limited 27,470.00 50,374.63 Signed 2019-05-14 2019-05-10 2019-07-09 2019-07-02 2020-01-05 2020-05-08 Agribusiness Clusters Quotations Envelope System/ Battery Banks and accessories etc) APPEALSP-LGSCO-GO-07 / Procurement of computers and accessories: 20 Nos Computer Laptops with carrier bags for projects officers, Project Management and Request for Single Stage - One IDA / 59930 Post Limited 28,830.00 56,284.84 Signed 2019-04-30 2019-05-02 2019-06-25 2019-07-01 2019-12-22 2019-07-31 External hard drive(EHD) and Coordination Quotations Envelope Flash drives, 20 units of Modem, Printers and Scanners, Global Positioning System (GPS) APPEALSP-LGSCO-GO-08 / Procurement of the following soft wares: 10 units of Database tracking soft ware, Project Management and Request for Single Stage - One IDA / 59930 Post Limited 21,560.00 15,595.85 Completed 2019-04-30 2019-07-15 2019-06-25 2019-07-16 2019-12-22 2019-08-06 5 users Smart draw for Coordination Quotations Envelope excelent chart and reporting; Computer aided design CAD Soft wares Page 1 APPEALSP-LGSCO-GO-09 / Under Project Management and Request for Single Stage - One Procurement of 1 unit of IDA / 59930 Post Limited 71,430.00 0.00 Implementati 2019-05-20 2019-05-30 2019-07-15 2020-01-11 Coordination Quotations Envelope project Utility vehicle on NG-LAGOS APPEALS-158835- Primary processing, Value GO-RFQ / Procurement of Addition, Post-Harvest Request for Single Stage - One IDA / 59930 Post Limited 83,330.00 229,662.72 Signed 2020-04-28 2020-04-23 2020-06-23 2020-05-06 2020-12-20 2020-06-02 facilities for the Establishment Management and Women & Quotations Envelope of Farmers Markets Youth Empowerment NG-LAGOS APPEALS-158940- Project Management and Request for Single Stage - One GO-RFQ / Procurement of 2 IDA / 59930 Post Limited 154,000.00 138,069.27 Signed 2020-03-28 2020-03-30 2020-05-23 2020-04-24 2020-11-19 2020-04-28 Coordination Quotations Envelope Utility vehicles NG-LAGOS APPEALS-158738- Primary processing, Value GO-RFQ / Procurement of Addition, Post-Harvest Request for Single Stage - One IDA / 59930 Post Limited 27,780.00 0.00 Canceled 2020-09-26 2020-11-21 2021-05-20 facilities for the Establishment Management and Women & Quotations Envelope of One-Stop-Shop Youth Empowerment APPEALSP-LGSCO-GO-9C / Technical Assistance, Pending Procurement of (Furniture, Request for Single Stage - One IDA / 59930 Knowledge Management and Post Limited 27,778.00 0.00 Implementati 2021-08-08 2021-10-03 2022-04-01 Workstation etc)for the Quotations Envelope Communication on Establishment of Library APPEALSP-LGSCO-GO-08C / Technical Assistance, Pending Procurement of knowleged Request for Single Stage - One IDA / 59930 Knowledge Management and Post Limited 27,778.00 0.00 Implementati 2021-08-04 2021-09-29 2022-03-28 material repository for Quotations Envelope Communication on Development of e-library NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-LAGOS APPEALS-156950- Consultant CS-CQS / Feasibility study on Production and Productivity IDA / 59930 Post Qualification Open - National 40,280.00 0.00 Under Review 2020-04-30 2020-06-04 2020-05-21 2020-09-14 2020-07-04 2020-07-20 2020-08-03 2020-09-07 2021-03-06 the establishment of bird Enhancement Selection hatchery in the State NG-LAGOS APPEALS-162010- CS-CQS / Engagement of a Primary processing, Value Consultants for the facilitation Consultant Addition, Post-Harvest of all activities for the PWDs IDA / 59930 Post Qualification Open - National 33,330.00 0.00 Under Review 2020-03-09 2020-03-20 2020-03-30 2020-05-13 2020-06-12 2020-07-17 2021-01-13 Management and Women & (Training, Mentoring, Selection Youth Empowerment Monitoring etc) support under the WYEP NG-LAGOS APPEALS-162013- Primary processing, Value CS-CQS / Engagement of Consultant Addition, Post-Harvest Under Consultancy to facilitate IDA / 59930 Post Qualification Open - National 27,780.00 0.00 2020-05-25 2019-06-20 2020-06-15 2020-07-29 2020-08-28 2020-10-02 2021-03-31 Management and Women & Implementation International Market Selection Youth Empowerment Expectation for Aquaculture NG-LAGOS APPEALS-161811- Primary processing, Value Consultant CS-CQS / Feasibility Study on Addition, Post-Harvest Under IDA / 59930 Post Qualification Open - National 27,780.00 0.00 2020-04-20 2020-05-28 2020-05-11 2020-06-24 2020-07-24 2020-08-28 2021-02-24 production of Egg Powder Management and Women & Implementation Selection technology in the State. Youth Empowerment NG-LAGOS APPEALS-161999- CS-CQS / Technical Consultant Assistance for the conduct of Production and Productivity IDA / 59930 Post Qualification Open - National 27,780.00 0.00 Canceled 2020-03-31 2020-04-21 2020-06-04 2020-07-04 2020-08-08 2021-02-04 Need Assessment for the Enhancement Selection selected value chains of Poultry, Aquaculture and Rice. NG-LAGOS APPEALS-162000- CS-CQS / Consultancy to Consultant source for climate smart, Production and Productivity IDA / 59930 Post Qualification Open - National 27,780.00 0.00 Canceled 2020-05-18 2020-06-08 2020-07-22 2020-08-21 2020-09-25 2021-03-24 nutrition sensitive and Enhancement Selection improved technologies to enhance Farmers productivity NG-LAGOS APPEALS-162005- Technical Assistance, Consultant CS-CQS / Consultancy on IDA / 59930 Knowledge Management and Post Qualification Open - National 27,880.00 0.00 Canceled 2020-06-09 2020-06-30 2020-08-13 2020-09-12 2020-10-17 2021-04-15 Production of Project Communication Selection Documentary NG-LAGOS APPEALS-162001- Consultant CS-CQS / Technical Support Project Management and IDA / 59930 Post Qualification Open - National 27,780.00 0.00 Canceled 2020-04-28 2020-05-19 2020-07-02 2020-08-01 2020-09-05 2021-03-04 to strengthen the fiduciary Coordination Selection system of the Project NG-LAGOS APPEALS-162006- CS-CQS / Technical Technical Assistance, Consultant Assistance on Production of IDA / 59930 Knowledge Management and Post Qualification Open - National 41,670.00 0.00 Canceled 2020-04-29 2020-05-20 2020-07-03 2020-08-02 2020-09-06 2021-03-05 Knowledge and learning Communication Selection products NG-LAGOS APPEALS-162008- CS-CQS / Consultancy Consultant services for the Enviromental Project Management and IDA / 59930 Post Qualification Open - National 33,330.00 0.00 Canceled 2020-03-23 2020-04-13 2020-05-27 2020-06-26 2020-07-31 2021-01-27 and Social Impact Assesmemt Coordination Selection (including ESMP) for Rural Infrastructural support NG-LAGOS APPEALS-158859- Consultant CS-CQS / Engagement of Infrastructure Support to IDA / 59930 Post Qualification Open - National 36,105.55 0.00 Canceled 2020-04-15 2020-05-06 2020-06-19 2020-07-19 2020-08-23 2021-02-19 Consultant for the Design of Agribusiness Clusters Selection 14.66 Km Farm Access Road. Page 2 NG-LAGOS APPEALS-162012- CS-CQS / Consultancy on Primary processing, Value Market Sensitivity Analysis Consultant Addition, Post-Harvest and Determination of IDA / 59930 Post Qualification Open - National 27,780.00 0.00 Canceled 2020-04-30 2020-05-21 2020-07-04 2020-08-03 2020-09-07 2021-03-06 Management and Women & Consumer Preference for Selection Youth Empowerment Poultry, Aquaculture and Rice value chains INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual APPEALSP-LGSCO-CS-01 / Consultancy on the conduct of Primary processing, Value Individual Technical Feasibility Studies Addition, Post-Harvest IDA / 59930 Post Consultant Limited 13,740.00 13,793.10 Completed 2019-04-18 2019-06-26 2019-04-23 2019-05-03 2019-05-14 2019-07-04 2019-06-18 2019-08-23 2019-12-15 2019-12-06 on Market Information / Management and Women & Selection Opprtunities for the selected Youth Empowerment value chains in the State. APPEALSP-LGSCO-CS-02 / Consultancy for the Technical Assistance, Individual engagement of Technical IDA / 59930 Knowledge Management and Post Consultant Limited 13,740.00 0.00 Canceled 2019-05-19 2019-06-26 2019-05-24 2019-06-14 2019-07-19 2020-01-15 assistant to strengthen the Communication Selection financial management of the Project. APPEALSP-LGSCO-CS-03 / Technical Assistance, Individual Conduct of Survey on effective IDA / 59930 Knowledge Management and Post Consultant Limited 13,740.00 0.00 Canceled 2019-05-21 2019-06-26 2019-05-26 2019-07-30 2019-06-16 2019-07-21 2020-01-17 communication channels in Communication Selection Lagos State APPEALSP-LGSCO-CS-04 / Individual Engagement of consultant for Project Management and IDA / 59930 Post Consultant Limited 8,240.00 13,226.06 Under Review 2019-09-26 2019-06-26 2019-10-01 2019-08-01 2019-10-22 2019-09-26 2019-11-26 2019-09-13 2020-05-24 2020-01-22 the development of greivance Coordination Selection redress mechanism(GRM) APPEALSP-LGSCO-CS-05 / Technical Assistance, Individual Production & Airing of Jingles IDA / 59930 Knowledge Management and Post Consultant Limited 13,740.00 13,679.90 Under Review 2019-04-29 2019-06-26 2019-05-04 2019-06-27 2019-05-25 2019-07-26 2019-06-29 2019-08-05 2019-12-26 2020-03-02 (Yoruba, English, Pidgin on Communication Selection Radio NG-LAGOS APPEALS-162004- CS-INDV / Consultancy on Technical Assistance, Individual News feature of project IDA / 59930 Knowledge Management and Post Consultant Limited 19,440.00 0.00 Under Review 2020-03-31 2019-07-03 2020-04-05 2020-04-26 2020-05-31 2020-11-27 activities in print and Communication Selection electronic media NG-LAGOS APPEALS-158943- Technical Assistance, Individual CS-INDV / Conduct of Survey IDA / 59930 Knowledge Management and Post Consultant Limited 27,780.00 0.00 Under Review 2020-04-20 2020-07-07 2020-04-25 2020-05-16 2020-06-20 2020-12-17 on effective communication Communication Selection channels in Lagos State NG-LAGOS APPEALS-158856- Individual Project Management and CS-INDV / Consultancy for IDA / 59930 Post Consultant Limited 8,330.00 0.00 Canceled 2020-06-10 2020-06-15 2020-07-06 2020-08-10 2021-02-06 Coordination GBV mapping in the State Selection NG-LAGOS APPEALS-158845- CS-INDV / Engagement of Individual Infrastructure Support to Consultant for preparation of IDA / 59930 Post Consultant Limited 13,890.00 0.00 Canceled 2020-09-23 2020-09-28 2020-10-19 2020-11-23 2021-05-22 Agribusiness Clusters ESMP for 3NO Cottage Selection Industries NG-LAGOS APPEALS-158903- Individual CS-INDV / Consultancy on the Infrastructure Support to IDA / 59930 Post Consultant Limited 16,670.00 0.00 Canceled 2020-04-15 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Design and Supervision of Agribusiness Clusters Selection Energy Interventions NG-LAGOS APPEALS-158889- CS-INDV / Engagement of Individual Infrastructure Support to consultant for the Design of 2 IDA / 59930 Post Consultant Limited 25,000.00 0.00 Canceled 2020-04-24 2020-04-29 2020-05-20 2020-06-24 2020-12-21 Agribusiness Clusters Nos of Jetties (Badagry; Selection Agbowa) NG-LAGOS APPEALS-158916- Individual CS-INDV / Engagement of Project Management and IDA / 59930 Post Consultant Limited 27,780.00 0.00 Canceled 2020-10-19 2020-10-24 2020-11-14 2020-12-19 2021-06-17 Technical Assistant on Coordination Selection Agricultural Production Survey Individual APPEALSP-LGSCO-CS-03C / Infrastructure Support to Pending IDA / 59930 Post Consultant Limited 19,444.00 0.00 2021-06-22 2021-06-27 2021-07-18 2021-08-22 2022-02-18 Design of Energy for Clusters Agribusiness Clusters Implementation Selection APPEALSP-LGSCO-CS-02C / Individual Infrastructure Support to Pending Engagement of consultant for IDA / 59930 Post Consultant Limited 20,834.00 0.00 2021-05-29 2021-06-03 2021-06-24 2021-07-29 2022-01-25 Agribusiness Clusters Implementation the design of Jetties Selection Individual NG-LAGOS APPEALS-158941- Project Management and IDA / 59930 Post Consultant Limited 13,890.00 0.00 Canceled 2020-04-02 2020-04-07 2020-04-28 2020-06-02 2020-11-29 CS-INDV / Market Price Survey Coordination Selection Page 3 Procurement Plan Community Development Program Support Project – Phase III (Programme National de Développement Participatif – Phase III) I. General 1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017 2. Date of General Procurement Notice: February 15, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million 5. DC (Non-Consultant Services) none 2. Prequalification. Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank. 4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016 May 05, 2017 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descriptio Estimate Packag Domesti Review Comments No. n d es c by Bank Cost Prefere (Prior / US$ nce Post) million (yes/no) Summary of 2.328 2 No Prior the ICB (Goods) Summary of 0.700 1 No Post 1st contract the NCB for Prior (Goods) Review III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 500,000 Justification prior reviewed by bank 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule May 05, 2017 1 2 3 4 5 6 7 Ref Description of Estimate Selection Review Expecte Comment . Assignment d cost method by the d s/ No (US$ Bank proposal completio equivale (prior/po s n date nt) st) submissi on date For the Support for the 1 Post first year preparation of 20,000 IC 21/08/15 24/09/15 Statutory Instruments (30 days) 2 Study on the definition 40,000 Post 22/04/16 of a planning CQS 25/01/16 (03 methodology at months) regional level 3 Study on the planning 40,000 CQS Post 25/01/16 22/04/16 process in the (03 communes and urban months) communities 4 Study for the 20,000 IC Post 19/02/16 24/03/16 establishment of local (30 days) public service in communes 5 Study on the 40,000 CQS Post 11/04/16 18/07/16 sustainability of the (03 PNDP months) 6 Evaluation of the 40,000 CQS Post 13/07/16 18/10/16 decentralization (03 process in months) Cameroon/supports to the finalization of the national strategy for decentralization 7 Selection of a 20,000 IC Post 20/11/15 30/12/15 consultant to develop (30 days) the practitioner's manual for the 31 communes 8 Municipal staff training 100,000 SSS Prior NA Service provided by the CEFAM (Conventio n) 9 Training of 100,000 SSS Prior NA Service procurement provided commissions by ARMP (Conventio n) 10 Financial Audits of the 150,000 LCS Post 10/03/15 Contract project for the first 2 for 2 years years 11 legal advice 10,000 IC Post 28/12/15 Annual contract May 05, 2017 1 2 3 4 5 6 7 Ref Description of Estimate Selection Review Expecte Comment . Assignment d cost method by the d s/ No (US$ Bank proposal completio equivale (prior/po s n date nt) st) submissi on date 12 Design and 90,000 CQS Post 12/02/16 22/08/16 development of an (06 internet portal on the months) PNDP and communes 13 Translation of 90,000 CQS Post 11/05/16 20/08/16 documents (03 months) 14 Technical audit 80,000 QCBS Post 16/02/16 31/08/16 (06 months) 15 Beneficiary assessment 50,000 QCBS Post 15/11/16 22/05/17 (06 months) 16 Environmental and 70,000 QCBS Post 13/12/16 26/06/17 Social Assessment (06 months) 17 Service Follow-up of training SSS Prior NA provided deployment and by AIMF 70,000 technical assistance to expert Sim_ba software in (Conventio communes n) 18 IC Post 27/05/15 Annual contract (the 10,000 current contract ends June Insurance advice 30, 2015) 19 QCBS Post 01/12/16 16/04/16 Preparation of CDPs for 80,000 (06 the 31 communes months) May 05, 2017 PROCUREMENT Cameroon : Community Development Program Support Project-Phase III PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan: 2017-05- 30 2021-06- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144637 GPN Date: 01 2016-09- Project Name: Community Development Program Support Project-Phase III 06 Loan / Credit No: IDA / 57180, IDA / D2990, IDA / 62240 CELLULE REGIONALE DE COORDONATION - EXTREME NORD Executing Agency(ies): WORKS Activity Reference No. Procurement Estimate Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati High SEA/SH Process Prequalification Bidding Documents Contract / Description Component Review Type Method Document d Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Risk Status Evaluation Report as Issued Completion Type Amount (US$) Documents Justification / Invitation Opening / Minutes Recommendation (US$) Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planne d CM-CRC EXTREME NORD- 8012-CW-RFQ / Petits Component C: travaux d'aménagement des Coordination, management, Request for Single Stage - One Complete 2017-03- 2017-05- 2017-05- 2017-07- 2017- bureaux (cloisonnement des IDA / 57180 Post Limited 5,600.00 4,722.91 monitoring and evaluation Quotations Envelope d 10 26 05 22 06-04 bureaux, équipement and communication étagères pour classement, etc...) à la CRC EN CM-CRC EXTREME NORD- 8013-CW-RFQ / Construct et équipt d'01 bloc de 02 de sc et d'un bloc de Lt à trois comparts à l'EP de Dogba, Component A: Local Request for Single Stage - One 154,638.0 139,405. 2017-03- 2017-06- 2017-05- 2017-10- 2017- au lycée de Gayack et IDA / 57180 Post Limited Signed development support Quotations Envelope 0 62 25 12 20 30 09-17 Construction de 01 bloc de hangar de 52 pces et d'un bloc de Lt à trois comparts au marché de Papata,Commune de Mra II CM-CRC EXTREME NORD- 8016-CW-RFQ / Constructde 6 forages équipés de PMH à Tchékéhi, Component A: Local Request for Single Stage - One 68,485.3 2017-03- 2017-05- 2017-05- 2017-09- 2017- IDA / 57180 Post Limited 96,000.00 Signed Mbokouré, Magaldao development support Quotations Envelope 0 25 30 20 12 08-18 Toupéo, Soukkoungo Galdima, Bourango et Bandalaré, commune de Pétté CM-CRC EXTREME NORD- 8035-CW-RFQ / Construct d'un magasin de stockage à Kéné-Kéné, Construct d'un Component A: Local Request for Single Stage - One 68,573.2 2017-03- 2017-05- 2017-05- 2017-09- 2017- IDA / 57180 Post Limited 82,609.00 Signed bloc de 02 sc équipées à development support Quotations Envelope 6 25 30 20 12 08-18 l'EP de Djafgué, et Construct d'un bloc de Lt à l'EP de Djafgué commune de Pétté CM-CRC EXTREME NORD- 8036-CW-RFQ / Constr d'un forage pastoral à énergie solaire équipé de 02 abreuvoirs à Balaza Lawane Component A: Local Request for Single Stage - One 76,928.1 Complete 2017-03- 2017-05- 2017-05- 2017-09- 2017- IDA / 57180 Post Limited 82,196.00 (Tchalloudi mango) et development support Quotations Envelope 6 d 25 15 20 12 08-18 Constr d'un forage pastoral à énergie solaire équipé de 02 abreuvoirs à Kongola Saïd, Cne Maroua 3 CM-CRC EXTREME NORD- 8037-CW-RFQ / Construct d'un bloc de 02 sc équipées et d'un bloc de Lt à trois Component A: Local Request for Single Stage - One 136,106.0 2017-03- 2017-05- 2017- IDA / 57180 Post Limited 0.00 Canceled comparts à l'EP de Mayel development support Quotations Envelope 0 25 20 08-18 Béi, à l'EP de Bao Hosséré II et à l'EP de Palaoudi, commune Maroua 1 CM-CRC EXTREME NORD- 8040-CW-RFQ / construction d'un bloc Component A: Local Request for Single Stage - One 46,402.6 2017-03- 2017-05- 2017-05- 2017-08- 2017- maternel à l'école Maternelle IDA / 57180 Post Limited 57,421.00 Signed development support Quotations Envelope 2 25 15 20 17 08-18 de Zokok-Laddo et branchement au réseau d'alimentation en eau potable, commune de Maroua 1 CM-CRC EXTREME NORD- 8042-CW-RFQ / Construction de trois Component A: Local Request for Single Stage - One 39,964.5 2017-03- 2017-05- 2017-05- 2017-09- 2017- forages équipés de pompe à IDA / 57180 Post Limited 46,689.00 Signed development support Quotations Envelope 9 25 25 20 12 08-18 motricité humaine à Ouro Dow, Goni Bello et Yoldéo Guiziga, Commune Maroua 1 CM-CRC EXTREME NORD- 8043-CW-RFQ / Construction de d'un bloc de 02 salles de classe Component A: Local Request for Single Stage - One 77,069.0 2017-03- 2017-04- 2017-05- 2017-07- 2017- IDA / 57180 Post Limited 92,247.00 Signed équipées et d'un bloc de development support Quotations Envelope 7 25 25 20 07 08-18 latrines à trois compartiments à l'EP Masfaï et au CES de Boula, commune de Mokolo CM-CRC EXTREME NORD- 8045-CW-RFQ / Construction de 2 forages Component A: Local Request for Single Stage - One 30,426.6 2017-03- 2017-04- 2017-05- 2017-07- 2017- IDA / 57180 Post Limited 33,787.00 Signed équipés de PMH un à Ouro development support Quotations Envelope 4 25 05 20 07 08-18 Kessoum et à Mounam, commune de Mokolo CM-CRC EXTREME NORD- 8047-CW-RFQ / Construction d'un ouvrage Component A: Local Request for Single Stage - One 81,284.7 Complete 2017-03- 2017-03- 2017-05- 2017-10- 2017- de franchissement et IDA / 57180 Post Limited 87,751.00 development support Quotations Envelope 8 d 25 31 20 31 08-18 assainissement(radier-dalot) sur le Mayo Kwayaga, dans la commune de Mogodé CM-CRC EXTREME NORD- 8050-CW-RFQ / Construction d'un bloc de 02 salles de classe équipées Component A: Local Request for Single Stage - One 85,878.4 Complete 2017-03- 2017-04- 2017-05- 2017-06- 2017- IDA / 57180 Post Limited 90,443.00 et d'un bloc de latrines à development support Quotations Envelope 9 d 25 06 20 21 08-18 trois compartiments à l'EP de Saoudjo et au CES de Madaka, commune de Bogo CM-CRC EXTREME NORD- 8053-CW-RFQ / Component A: Local Request for Single Stage - One 28,863.6 2017-03- 2017-04- 2017-05- 2017-07- 2017- Construction d'un forage IDA / 57180 Post Limited 32,294.00 Signed development support Quotations Envelope 3 25 06 20 05 08-18 équipé de PMH à Dambaye et à Bagalaf commune de Bogo CM-CRC EXTREME NORD- 8054-CW-RFQ / construction d'un bloc de deux (02) salles de classe equipees et un (01) bloc Component A: Local Request for Single Stage - One 178,787.0 163,753. Complete 2017-03- 2017-07- 2017-05- 2017-10- 2017- IDA / 57180 Post Limited latrine a trois (03) development support Quotations Envelope 0 46 d 25 07 20 27 09-17 compartiments a l'EP de honkol, a l'EP de darsala, a l'EP de dabanga et l'equipement en meubles a l'ecole maternelle de logone birni CM-CRC EXTREME NORD- 8056-CW-RFQ / construction de trois forages équipés de pompe à Component A: Local Request for Single Stage - One 44,814.2 Complete 2017-03- 2017-04- 2017-05- 2017-06- 2017- IDA / 57180 Post Limited 50,245.00 motricité humaines: un à development support Quotations Envelope 4 d 25 20 20 30 08-18 l'EP de Dabanga, un à l'EP de Honkol et un à l'EP de Darsala dans la Commune de Logone Birni CM-CRC EXTREME NORD- 8057-CW-RFQ / construction d'un forage Component A: Local Request for Single Stage - One 41,388.9 Complete 2017-03- 2017-04- 2017-05- 2017-06- 2017- pastoral équipé de pompe IDA / 57180 Post Limited 45,860.00 development support Quotations Envelope 5 d 25 20 20 30 08-18 immergée à énergie photovoltaique à Sahaba 1 dans la Commune de Logone Birni CM-CRC EXTREME NORD- 8068-CW-RFQ / réhabilitation de la mare artificielle et la construction Component A: Local Request for Single Stage - One 114,601.0 91,831.5 Complete 2017-03- 2017-07- 2017-05- 2017-11- 2017- IDA / 57180 Post Limited d'un forage pastoral à development support Quotations Envelope 0 8 d 25 07 20 27 09-17 energie photovoltaique à Mogong dans la commune de Moutourwa CM-CRC EXTREME NORD- 8072-CW-RFQ / construction de 2 blocs de deux salles de classe Component A: Local Request for Single Stage - One 115,353.0 102,090. 2017-03- 2017-03- 2017-05- 2017-06- 2017- IDA / 57180 Post Limited Signed équipées et de 2 blocs de development support Quotations Envelope 0 02 25 23 20 12 08-18 latrines à trois compartiments EP NGré et EP Afadé dans la commune de Makary CM-CRC EXTREME NORD- 38352-CW-RFB / Travaux de construction d'un forage PMH à Kaliao, Goulmoyo, Mbozo Mofou, Balewa et Component A: Local Single Stage - One 260,774.0 200,809. 2017-11- 2017-11- 2017-12- 2018-01- 2018-01- 2018-02- 2018-01- 2018-03- 2018-04- 2018- Manguirdla (Lot 1), IDA / 57180 Post Request for Bids Open - National Signed development support Envelope 0 46 27 01 02 13 15 12 19 19 04 06-17 Gadjawai, Guivel, Quartier Méri centre, Nguissar et Kilwo-Valta (Lot 2), Moundour Foulbé, Dogba Maliki, Magawa, Houloum et Tchaki djébé (Lot 3) C-MERI CM-CRC EXTREME NORD- 38353-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Request for Single Stage - One 36,949.0 2017-12- 2017-12- 2018-01- 2018-07- 2018- de deux salles de classe IDA / 57180 Post Limited 51,198.00 Signed development support Quotations Envelope 6 02 23 27 12 04-27 équipées et un bloc de latrines au C.E.S de Manguirdla dans la commune de Meri CM-CRC EXTREME NORD- 38354-CW-RFQ / Travaux de construction d'un bloc de Component A: Local Request for Single Stage - One 67,277.8 2017-12- 2017-12- 2018-01- 2018-04- 2018- deux salles de classe IDA / 57180 Post Limited 95,682.00 Signed development support Quotations Envelope 1 02 28 27 04 04-27 équipées avec latrines à l'EP de Domo Doukou et à l'EP de Riganda COMMUNE DE YAGOUA CM-CRC EXTREME NORD- 38355-CW-RFQ / Travaux de construction d'un bloc de deux salles de classe Component A: Local Request for Single Stage - One 82,938.9 2017-12- 2017-12- 2018-01- 2018-03- 2018- IDA / 57180 Post Limited 99,316.00 Signed équipées et un bloc de development support Quotations Envelope 4 02 22 27 27 04-27 latrines à l'EP de Pitoa- Kolara et à l'EP de Badadji COMMUNE DE MOULVOUDAYE CM-CRC EXTREME NORD- 38356-CW-RFQ / Travaux de construction d'un bloc de Component A: Local Request for Single Stage - One 79,132.8 Complete 2017-12- 2017-12- 2018-01- 2018-04- 2018- deux salles équipées et un IDA / 57180 Post Limited 91,386.00 development support Quotations Envelope 6 d 02 22 27 09 04-27 bloc de latrines à l'EP de Djagalaye et au CES de Hardé COMMUNE DE MAROUA Ier CM-CRC EXTREME NORD- 38357-CW-RFQ / Travaux de construction d'un bloc de deux salles équipées et un Component A: Local Request for Single Stage - One 82,420.0 Complete 2017-12- 2017-12- 2018-01- 2018-04- 2018- bloc de latrines CES de IDA / 57180 Post Limited 89,342.00 development support Quotations Envelope 0 d 02 22 27 04 04-27 Balda et Construction d'un bloc de deux salles de classe équipées à l'EP de Sedek Ouro-Gabdo COMMUNE DE BOGO CM-CRC EXTREME NORD- 38358-CW-RFQ / Travaux de Construction de 01 forage PMH A EM de Ldamtsai, Mandaka Component A: Local Request for Single Stage - One 133,467.0 117,088. 2017-12- 2017-12- 2018-01- 2018-04- 2018- Mpoldok, Camp mission de IDA / 57180 Post Limited Signed development support Quotations Envelope 0 54 02 26 27 08 04-27 Tourou, Koudougour II Loctcha, Katamsa Sikia, Gouldoum Moufou, Houdango Dandi et Ouro Bocki(2lots) dans la commune de Mokolo CM-CRC EXTREME NORD- 38359-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 14,057.2 2017-12- 2018-01- 2018-01- 2018-04- 2018- de construction d' un forage IDA / 57180 Post Limited 15,816.00 Signed development support Quotations Envelope 0 02 31 27 05 03-28 équipé de PMH à l'EP de Riganda commune YAGOUA CM-CRC EXTREME NORD- 38360-CW-RFQ / Travaux de construction d'un forage équipé de PMH à l'EP de Component A: Local Request for Single Stage - One 61,321.8 2017-12- 2017-12- 2018-01- 2018-03- 2018- IDA / 57180 Post Limited 72,362.00 Signed Badadji, à l'EP de Pitoa- development support Quotations Envelope 8 02 22 27 26 04-27 Kolara, au lycée de Kolara et à Gadjia Padjonré COMMUNE DE MOULVOUDAYE CM-CRC EXTREME NORD- 38361-CW-RFQ / Travaux de construction d'un forage Component A: Local Request for Single Stage - One 35,012.7 2017-12- 2017-12- 2018-01- 2018-04- 2018- équipé de PMH à l'EP de IDA / 57180 Post Limited 48,640.00 Signed development support Quotations Envelope 5 02 22 27 09 04-27 Yamdjidjing, à l'EP de Djagalaye et à Zébé COMMUNE DE MAROUA Ier CM-CRC EXTREME NORD- 38362-CW-RFQ / Travaux de Construction d'un forage équipé de pompe à motricité humaine à l'EP de Component A: Local Request for Single Stage - One 67,323.3 2017-12- 2017-12- 2018-01- 2018-04- 2018- IDA / 57180 Post Limited 94,648.00 Signed Sedek Ouro Gabdo à Ardo development support Quotations Envelope 9 02 22 27 04 04-27 Foulbé Tankirou à Gagnéri Kourdaya à Guinlaye Guizigaré et Guinlaye Moufouré dans la commune BOGO CM-CRC EXTREME NORD- 38386-CW-RFQ / Travaux de construction d'un bloc de deux salles de classe équipées avec latrines à l'EP Component A: Local Single Stage - One 237,076.0 213,978. 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-04- 2018- de Mouftoum et à l'Ecole IDA / 57180 Post Request for Bids Open - National Signed development support Envelope 0 48 27 19 02 13 25 12 01 19 09 06-17 Bilingue de Rhoumzou (Lot 1), au lycée de SIR et à l'EPB de Kwashimalda (Lot 2) , au CES de Goura (Lot 3) dans la commune de Mogode CM-CRC EXTREME NORD- 38387-CW-RFB / Travaux de construction d'un bloc de deux salles équipées et un bloc de latrines à l'EP de Component A: Local Single Stage - One 233,628.0 193,465. 2017-11- 2017-11- 2017-12- 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-04- 2018- IDA / 57180 Post Request for Bids Open - National Signed Ldamang et à l'EP de Ndrock development support Envelope 0 09 27 01 02 13 13 12 14 19 06 06-17 Tourou (Lot 1), l'EP de Moufou-sud et à l'EP de Zili Yolel (Lot 2),au CES de Mandaka (Lot 3) dans la commune de MokolO CM-CRC EXTREME NORD- 38388-CW-RFB / Travaux de construction d'un radier Component A: Local Single Stage - One 27,858.8 2017-11- 2017-12- 2017-12- 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-04- 2018- IDA / 57180 Post Request for Bids Open - National 34,548.00 Signed de 12 ml sur le mayo Teki development support Envelope 7 27 11 02 13 19 12 19 19 04 06-17 dans la localité de Teki, dans la commune de Mogode CM-CRC EXTREME NORD- 58606-CW-RFQ / Travaux de Construct d'un bloc de Component A: Local Request for Single Stage - One 73,189.1 2017-10- 2017-12- 2017-12- 2018- 02 sc équipées et d'un bloc IDA / 57180 Post Open - National 86,221.00 Signed development support Quotations Envelope 1 08 03 04 03-03 de Lt à trois comparts à l'EP de Mayel Béi, et à l'EP de Palaoudi l cmne Maroua 1 CM-CRC EXTREME NORD- 58541-CW-RFQ / Travaux de construction d'un forage Component A: Local Request for Single Stage - One 42,885.4 2018-05- 2018-05- 2018-07- 2018-09- 2018- productif équipé de pompe IDA / 57180 Post Limited 63,894.00 Signed development support Quotations Envelope 1 06 17 08 11 10-06 manuelle à EP Louguéré à EP Ouro Nangué à Fakalao à Hodango CM-CRC EXTREME NORD- 58600-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées Component A: Local Request for Single Stage - One 67,400.3 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited 93,735.00 Signed et construction d'un bloc de development support Quotations Envelope 4 06 17 01 11 09-29 latrines à trois compartiment à EP de WOUYANG et à l'EP de GONOZO CM-CRC EXTREME NORD- 58693-CW-RFQ / Travaux de Construction d'un atelier de maçonnerie au CETIC de Component A: Local Request for Single Stage - One 43,242.0 Complete 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited 68,198.00 Loulou et'un bloc de latrines development support Quotations Envelope 6 d 06 17 08 11 11-05 à trois compartiments au CETIC de Loulou COMMUNE DE NDOUKOULA CM-CRC EXTREME NORD- 58296-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées et d'un bloc de latrines à Component A: Local Request for Single Stage - One 142,608.0 118,724. Complete 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited trois compartiments à l'EP development support Quotations Envelope 0 87 d 06 10 08 10 10-06 de GUIRIOU CENTRE, (lot 01) au Lycée de DOM PYA, à la SAR/SM de Gobo(lot02) dans la cmne de GOBO Page 1 CM-CRC EXTREME NORD- 58490-CW-RFQ / Travaux de construction d'un bloc de Component A: Local Request for Single Stage - One 18,969.0 2018-05- 2018-09- 2018-07- 2018-12- 2018- latrines a quatre (04) IDA / 57180 Post Limited 22,188.00 Signed development support Quotations Envelope 7 06 05 08 26 10-06 compartiments au marché de GOBO et de NOULDAINA dans la cmne de GOBO CM-CRC EXTREME NORD- 58375-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 13,046.6 Complete 2018-05- 2018-05- 2018-07- 2018-09- 2018- de construction d'un forage IDA / 57180 Post Limited 15,668.00 development support Quotations Envelope 9 d 06 10 08 17 08-07 équipé de PMH à l'EP de GUIRIOU CENTRE CM-CRC EXTREME NORD- 58689-CW-RFQ / Travaux de construction d'un bloc de Component A: Local Request for Single Stage - One 35,806.9 Complete 2018-05- 2018-06- 2018-07- 2018-10- 2018- 02 salles de classe équipées IDA / 57180 Post Limited 47,536.00 development support Quotations Envelope 5 d 06 07 08 10 10-06 et d'un bloc de latrines à trois compartiments au CES de Doukroye CM-CRC EXTREME NORD- 58628-CW-RFQ / Travaux de construction d'un forage Component A: Local Request for Single Stage - One 10,491.3 2018-05- 2018-06- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 15,272.00 Signed équipé de PMH à l'EP de development support Quotations Envelope 3 06 13 08 15 10-06 Daloa (Doukroye) dans la cmne de KAIKAI CM-CRC EXTREME NORD- 58637-CW-RFQ / Travaux d'achevement de la Construction des ouvrages Component A: Local Request for Single Stage - One 15,519.7 Complete 2018-05- 2018-07- 2018-10- 2018- annexes d'embarquement IDA / 57180 Post Limited 33,961.00 development support Quotations Envelope 4 d 06 08 10 09-06 (quaie dembarquement et hangar d'abris)des pirogues à LOUGOUANG MASSOUANG dans la cmne de Kaikai CM-CRC EXTREME NORD- 58605-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées Component A: Local Request for Single Stage - One 73,407.1 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 95,312.00 Signed et d'un bloc de latrines à development support Quotations Envelope 8 06 29 08 10 10-06 trois compartiments à EP de Balane au CES de Sirlawé dans la cmne de KAR-HAY CM-CRC EXTREME NORD- 58552-CW-RFQ / Travaux de construction d'un forage équipé de PMH à l'EP de Component A: Local Request for Single Stage - One 65,668.0 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 91,324.00 Signed Damdama à l'EP de development support Quotations Envelope 7 06 29 08 15 10-06 Gouloulou à l'EP Balane à l'EP de REY-FOULAYE à l'EP de Sadielle au CES de Sirlawe CM-CRC EXTREME NORD- 58690-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées Component A: Local Request for Single Stage - One 73,038.9 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 99,800.00 Signed et d'un bloc de latrines à development support Quotations Envelope 7 06 15 08 17 10-06 trois compartiments à l'EP de Bihoré à l'EP de Troké dans la, commue de Tchatibali. CM-CRC EXTREME NORD- 58610-CW-RFQ / Travaux de construction d'un forage Component A: Local Request for Single Stage - One 33,727.6 2018-05- 2018-05- 2018-07- 2018-10- 2018- équipé de PMH à l'EP IDA / 57180 Post Limited 47,159.00 Signed development support Quotations Envelope 8 06 15 08 16 10-06 Saouringwa, à Kada 'a et Glonheme dans la cmne de Tchatibali CM-CRC EXTREME NORD- 58611-CW-RFQ / Travaux de construction d'un forage Component A: Local Request for Single Stage - One 35,580.8 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited 48,115.00 Signed équipé de PMH à Bibalé - development support Quotations Envelope 0 06 08 08 11 10-06 Gambour à Goubara à Kassilé dans la commue de Kaele CM-CRC EXTREME NORD- 58489-CW-RFQ / Travaux de réhabilitation de la mare de Garey Kaélé, Component A: Local Request for Single Stage - One 47,962.2 2018-05- 2018-05- 2018-07- 2018-09- 2018- Construction d'un forage IDA / 57180 Post Limited 55,100.00 Signed development support Quotations Envelope 8 06 08 08 11 10-06 pastoral à énergie solaire Garey Kaélé et construction d'un forage équipé de PMH à Kassilé dans la commue de Kaele CM-CRC EXTREME NORD- 58682-CW-RFQ / Travaux de Construction d'un bloc de 02 salles de classe équipées et d'un bloc Component A: Local Request for Single Stage - One 188,121.0 154,981. Complete 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited latrines a trois development support Quotations Envelope 0 86 d 06 08 08 27 10-06 compartiments à l'EP de Badjafe, à l'EP de Zouana, (lot 01 )à l'EP de Tchabeyel et EP de Goudjouing (lot 02) cmne de Kaele. CM-CRC EXTREME NORD- 58614-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées Component A: Local Request for Single Stage - One 72,592.8 2018-05- 2018-10- 2018-07- 2018-11- 2018- d'un bloc de latrines à EP IDA / 57180 Post Limited 87,556.00 Signed development support Quotations Envelope 6 06 01 08 29 10-06 Mayel -Guinadj et un bloc de 02 salles de classe équipées à l'EP de KALAF cmne de Moutourwa. CM-CRC EXTREME NORD- 58527-CW-RFQ / Travaux de construction de 01 Component A: Local Request for Single Stage - One 54,374.2 2018-05- 2018-10- 2018-07- 2018-11- 2018- forage équipé de PMH à IDA / 57180 Post Limited 64,020.00 Signed development support Quotations Envelope 8 06 10 08 16 10-06 Ganaha, à EP de Dourloum à EP de KALAF et EP de Mayel- guinadji dans la cmne de moutourwa CM-CRC EXTREME NORD- 58849-CW-RFQ / Component A: Local Request for Single Stage - One 30,049.0 2018-05- 2018-05- 2018-07- 2018-09- 2018- construction d'un forage IDA / 57180 Post Limited 37,902.00 Signed development support Quotations Envelope 9 06 08 08 24 10-06 équipé de PMH à EM Moskota et à l'EP GOKORO CM-CRC EXTREME NORD- 58676-CW-RFQ / Travaux de Construction d'un bloc de deux salles de classe équipées et d'un bloc Component A: Local Request for Single Stage - One 150,000.0 124,030. 2018-05- 2018-06- 2018-07- 2018-08- 2018- IDA / 57180 Post Limited Signed latrines a trois development support Quotations Envelope 0 36 06 04 08 30 10-06 compartiments au CES de Mazaya à EP ZELE (Soulédé) (lot01) à EP de Doumbéré(lot02) cmne de ROUA CM-CRC EXTREME NORD- 58267-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 23,886.6 2018-05- 2018-08- 2018-07- 2018-10- 2018- de construction d'un forage IDA / 57180 Post Limited 39,124.00 Signed development support Quotations Envelope 6 06 02 08 15 10-06 équipé de PMH à Koulang à Mangavé cmne de MORA CM-CRC EXTREME NORD- 58524-CW-RFQ / Travaux de construction de 01 Component A: Local Request for Single Stage - One 2018-05- 2018-08- 2018-07- 2018-10- 2018- magasin de stockage à IDA / 57180 Post Limited 69,155.00 2,421.57 Signed development support Quotations Envelope 06 02 08 22 11-05 cereale à Sera -Idoumda et un magasin de conservation d'oignon à Kourgui cmne de MORA CM-CRC EXTREME NORD- 58623-CW-RFQ / Travaux de Construction d'un forage équipé de PMH à l'EP GANCE Component A: Local Request for Single Stage - One 63,149.4 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited 79,756.00 Signed au CES Toltomari et development support Quotations Envelope 1 06 11 08 03 10-06 Réalisation d’un forage solaire avec borne fontaine à Kolofata cmne de Kolofata CM-CRC EXTREME NORD- 58445-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Request for Single Stage - One 131,092.0 110,625. 2018-05- 2018-05- 2018-07- 2018-09- 2018- de 02 salles de classe IDA / 57180 Post Limited Signed development support Quotations Envelope 0 81 06 07 08 24 11-05 équipées s à EP Chéoulew, au CES de Makalingaï (lot01)à EP Tazang (lot02) cmne de Tokombere CM-CRC EXTREME NORD- 58679-CW-RFQ / Travaux de Construction de 01 Component A: Local Request for Single Stage - One 35,355.2 Complete 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 29,122.00 forage équipé de PMH à development support Quotations Envelope 6 d 06 07 08 01 09-06 Baka-Fourwa et à Djaltar dans la cmne de Tokombere CM-CRC EXTREME NORD- 59466-CW-RFQ / TRAVAUX DE REHABILILATION DU Component A: Local Request for Single Stage - One 81,782.2 2018-05- 2018-09- 2018-07- 2018-10- 2019- IDA / 57180 Post Limited 93,480.00 Signed TRONCON HOTEL LE SAHEL- development support Quotations Envelope 2 06 14 08 15 01-04 MAYO-KALIAO (0,7 KM) cmne DE MAROUA Ier CM-CRC EXTREME NORD- 58513-CW-RFQ / TRAVAUX Component A: Local Request for Single Stage - One 74,376.6 2018-05- 2018-05- 2018-07- 2018-08- 2018- DE REHABILILATION DE LA IDA / 57180 Post Limited 90,301.00 Signed development support Quotations Envelope 7 06 14 01 24 12-28 PISTE SOUKOUDJO- BAGRISSE-FARARE (28 KM) CM-CRC EXTREME NORD- 58707-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local Request for Single Stage - One 45,015.4 Complete 2018-05- 2018-10- 2018-07- 2018-12- 2018- CLASSE EQUIPE ET D'UN IDA / 57180 Post Limited 52,286.00 development support Quotations Envelope 5 d 06 01 08 20 10-06 BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP KOUTOULA DANS LA CMNE DE BLANGOUA CM-CRC EXTREME NORD- 58839-CW-RFQ / TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA CONSTRUCTION DE 04 Component A: Local Request for Single Stage - One 68,084.6 2018-05- 2018-10- 2018-07- 2018-12- 2018- IDA / 57180 Post Limited 84,030.00 Signed GUICHETS, 04 MAGASINS, development support Quotations Envelope 6 06 01 08 20 11-05 D’UN HANGAR D’ATTENTE ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE DE 130 m A BLANGOUA CM-CRC EXTREME NORD- 58514-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN Component A: Local Request for Single Stage - One 21,590.5 2018-05- 2018-05- 2018-07- 2018-10- 2018- FORAGE EQUIPE DE PMH A la IDA / 57180 Post Limited 35,201.00 Signed development support Quotations Envelope 5 06 31 08 04 09-06 gare routiere de BLANGOUA ET A L'EP DE KOUTOULA DANS LA CMNE DE BLANGOUA CM-CRC EXTREME NORD- 58434-CW-RFQ / TRAVAUX DE CONSTRUCTION TRAVAUX DE CONSTRUCTION D’UNE MINI Component A: Local Request for Single Stage - One 36,812.8 Complete 2018-05- 2018-10- 2018-07- 2018-12- 2018- IDA / 57180 Post Limited 47,598.00 AEP PASTORAL EQUIPE DE development support Quotations Envelope 0 d 06 02 08 20 10-06 DEUX ABREUVOIRS, D’UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A MAGALAKABIR, DANS LA CMNE DE DARAK CM-CRC EXTREME NORD- 58286-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN Component A: Local Request for Single Stage - One 75,327.5 Complete 2018-05- 2018-06- 2018-07- 2018-10- 2018- FORAGE PASTORAL A IDA / 57180 Post Limited 96,354.00 development support Quotations Envelope 8 d 06 01 08 04 10-06 ENERGIE SOLAIRE A KARENA ET A NAGA DANS LA CMNE DE DARAK CM-CRC EXTREME NORD- 58688-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE EQUIPE ET D'UN BLOC DE LATRINES A TROIS Component A: Local Request for Single Stage - One 76,025.4 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 89,200.00 Signed COMPARTIMENTS A L’EP development support Quotations Envelope 7 06 14 08 01 10-06 HILELLE (LOT01) ET CONSTRUCTION D'UN HANGAR AU MARCHE DE GOULFEY GANA (LOT02) cmne DE GOULFEY CM-CRC EXTREME NORD- 58840-CW-RFQ / TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA CONSTRUCTION DE 04 Component A: Local Request for Single Stage - One 69,011.4 2018-05- 2018-09- 2018-07- 2018-12- 2018- GUICHETS, 04 MAGASINS, IDA / 57180 Post Limited 86,829.00 Signed development support Quotations Envelope 4 06 24 08 20 11-05 D’UN HANGAR D’ATTENTE, 02 BOUTIQUES ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE DE 90 m A GOULFEY cmne DE GOULFEY CM-CRC EXTREME NORD- 58451-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN FORAGE EQUIPES DE POMPE Component A: Local Request for Single Stage - One 40,595.7 Complete 2018-05- 2018-05- 2018-07- 2018-10- 2018- A MOTRICITE HUMAINE A IDA / 57180 Post Limited 66,094.00 development support Quotations Envelope 8 d 06 14 08 01 10-06 MOUGALAM, A TAWOULWEBE, A GARE ROUTIERE ET A L'EP HILELE COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 58554-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local Request for Single Stage - One 46,481.6 2018-05- 2018-10- 2018-07- 2018-12- 2018- IDA / 57180 Post Limited 52,286.00 Signed CLASSE EQUIPE ET D'UN development support Quotations Envelope 5 06 28 01 20 09-29 BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP GONONI CM-CRC EXTREME NORD- 58671-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN FORAGE EQUIPE DE POMPE A Component A: Local Request for Single Stage - One 21,590.5 Complete 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 51,376.00 MOTRICITE HUMAINE A development support Quotations Envelope 5 d 06 31 08 04 10-06 MAFOULSO III, A FAMARE ET A L'EP DE GONONI commune DE HILE ALIFA CM-CRC EXTREME NORD- 58631-CW-RFQ / TRAVAUX DE CONSTRUCTION TRAVAUX DE CONSTRUCTION D’UNE MINI Component A: Local Request for Single Stage - One 21,447.8 Complete 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 96,018.00 AEP PASTORAL EQUIPE DE development support Quotations Envelope 3 d 06 31 08 04 10-06 DEUX ABREUVOIRS, D’UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A ABASSOUNI, A DOLE BADA cmne DE HILE ALIFA CM-CRC EXTREME NORD- 58426-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local Request for Single Stage - One 43,152.3 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited 52,286.00 Signed CLASSE EQUIPE ET D'UN development support Quotations Envelope 1 06 11 08 24 10-06 BLOC DE LATRINES A TROIS COMPARTIMENTS AU CES D'ADJAÏNE cmne DE KOUSSERI CM-CRC EXTREME NORD- 58417-CW-RFQ / CONSTRUCTION D'UN FORAGE EQUIPE DE POMPE A MOTRICITE HUMAINE AU CES D'ADJAINE ET D'UNE Component A: Local Request for Single Stage - One 104,068.0 82,972.8 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited Signed MINI AEP PASTORAL EQUIPE development support Quotations Envelope 0 2 06 11 08 24 10-06 DE DEUX ABREUVOIRS, D'UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A LACTA 1, ET A MASSAKI COMMUNE DE KOUSSERI CM-CRC EXTREME NORD- 58510-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN FORAGES EQUIPES DE POMPE Component A: Local Request for Single Stage - One 40,954.4 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 Post Limited 49,640.00 Signed A MOTRICITE HUMAINE A development support Quotations Envelope 3 06 15 08 15 10-06 MASSIO-GOURGOURA, A NAGA NDIGUINI, A EP MALTAM. cmne DE MAKARI CM-CRC EXTREME NORD- 58677-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN Component A: Local Request for Single Stage - One 40,757.6 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Open - National 46,901.00 Signed HANGAR AVEC BLOC development support Quotations Envelope 9 06 01 10 09-29 LATRINE AU MARCHE DE BIAMO, cmne DE MAKARI CM-CRC EXTREME NORD- 58398-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local Request for Single Stage - One 43,675.8 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 Post Limited 52,286.00 Signed CLASSE EQUIPE ET D'UN development support Quotations Envelope 4 06 15 08 10 10-06 BLOC DE LATRINES A TROIS COMPARTIMENTS A L'EP DE MALTAM cmne DE MAKARI CM-CRC EXTREME NORD- 58564-CW-RFQ / Travaux des MP D'INSTALLATION D'ECLAIRAGE PUBLIC (10 Component A: Local Request for Single Stage - One 2018-05- 2018-07- 2018- IDA / 57180 Post Limited 47,904.00 0.00 Canceled KITS)AVEC ENERGIE SOLAIRE development support Quotations Envelope 06 08 09-06 DE L'AXE MAIRIE DE HILE ALIFA-BRIGADE DE GENDARMERIE DE HILE Page 2 CM-CRC EXTREME NORD- 58697-CW-RFB / TRAVAUX DE CONSTRUCTION DE DEUX SALLES DE CLASSES EQUIPEES ET DE LATRINES AU CETIC DE OUZAL (LOT Component A: Local Single Stage - Two 230,463.0 2018-05- 2018-05- 2018-05- 2018-06- 2018-08- 2018-10- 2019- IDA / 57180 Post Request for Bids Open - National 0.00 Canceled N°1), CONSTRUCTION DE development support Envelope 0 01 08 06 17 30 04 02-01 DEUX SALLES DE CLASSES EQUIPEES A L'EP DE KORSAMBA ET L'EP DE KARAZAWA (LOT N°2), CONSTRUCTION D'UN BLOC MATERNEL L'EM DE MOZOGO CM-CRC EXTREME NORD- 58498-CW-RFQ / Travaux de Construction d'un bloc de 02 salles de classe Component A: Local Request for Single Stage - One 2018-05- 2018-07- 2018- IDA / 57180 Post Limited 57,225.00 0.00 Canceled équipées à EP de Gance et development support Quotations Envelope 06 08 10-06 d'un bloc de latrines à trois compartiments à L'EP TOLKOMARI cmne de Kolofata CM-CRC EXTREME NORD- 58260-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX (02) SALLES DE CLASSE EQUIPEES A EP Component A: Local Request for Single Stage - One 151,984.0 120,021. 2018-05- 2018-09- 2018-07- 2018-11- 2018- DE GANCE ET D'UN BLOC IDA / 57180 Post Limited Signed development support Quotations Envelope 0 73 06 24 08 29 10-06 DE LATRINES A L'EP TOLKOMARI ( LOT 01) CONSTRUCTION DE DEUX BLOC DE DEUX (02) SALLES DE CLASSE EQUIPEES CES TOLkomari CM-CRC EXTREME NORD- 111329-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Request for Single Stage - One 40,309.2 2019-04- 2019-06- 2019-10- 2019- de 02 salles de classe IDA / 57180 Post Open - National 49,652.00 Signed development support Quotations Envelope 3 06 01 08 08-30 équipé et d'un bloc de latrines au CETIC de Tchévi dans la commune de Bourha CM-CRC EXTREME NORD- 111255-CW-RFQ / Travaux de Travaux de Construction Component A: Local Request for Single Stage - One 54,869.3 2019-04- 2019-06- 2019-11- 2019- d'un forage PMH au CETIC IDA / 57180 Post Open - National 65,429.00 Signed development support Quotations Envelope 8 06 01 04 08-30 de Tchévi, à Zouvou- yolde à DOUVA et à ZEU dans la commune de Bourha CM-CRC EXTREME NORD- 111381-CW-RFQ / Travaux de Construction des caniveaux en BA à Bourha Component A: Local Request for Single Stage - One 52,560.1 2019-04- 2019-06- 2019-10- 2019- IDA / 57180 Post Open - National 69,336.00 Signed (axe Hamadou -ZRA-Bello development support Quotations Envelope 0 06 01 03 08-30 Hayatou) (lot 01) et à Boukoula face commissariat (lot 02) dans la Commune de Bourha CM-CRC EXTREME NORD- 111363-CW-RFB / Travaux de Construction de deux (02) blocs de dix (10) boutiques au marché de Component A: Local Single Stage - One 258,957.0 17,073,0 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-12- 2019- HINA cote A lot (01) et IDA / 57180 Post Request for Bids Open - National Signed development support Envelope 0 76.62 01 24 06 18 21 17 24 22 19 11-19 Travaux de Construction de deux (02) blocs de dix (10) boutique et un bloc latrines vip au marché de HINA cote B lot (02), commune de HINA. CM-CRC EXTREME NORD- 111379-CW-RFQ / Travaux d'extension du reseau Component A: Local Single Stage - One 205,088.0 171,312. 2019-04- 2019-05- 2019-04- 2019-05- 2019-07- 2019-06- 2019-07- 2019-07- 2019-10- 2019- electrique de Dargala centre- IDA / 57180 Post Request for Bids Open - National Signed development support Envelope 0 93 01 14 06 18 01 17 02 22 17 11-19 Roufirde, Roufirde- Gassayel, Gassayel- Guertogalwo dans la commune de Dargala CM-CRC EXTREME NORD- 111324-CW-RFQ / Travaux de Construction de 01 Under forage à PMH à Yoldé- Component A: Local Request for Single Stage - One 100,326.0 2019-04- 2019-06- 2019- IDA / 57180 Post Open - National 0.00 Implemen Naggué, à Tchakamadjé, development support Quotations Envelope 0 06 01 09-29 tation Yaga djibiwo, à Bakourebi (Abba wollo) Toukou mayel(Ouro-Bedem) et à MAYA ,commune de Pétté CM-CRC EXTREME NORD- 111354-CW-RFQ / Travaux de Construction d'un mini Under Component A: Local Request for Single Stage - One 2019-04- 2019-06- 2019- adduction d'eau à energie IDA / 57180 Post Open - National 52,340.00 0.00 Implemen development support Quotations Envelope 06 01 08-30 photovoltaique pour usage tation agricole a fadare dans la commune de pette CM-CRC EXTREME NORD- 111372-CW-RFQ / Travaux de Construction de 01 Component A: Local Request for Single Stage - One 22,465.4 Complete 2019-04- 2019-06- 2019-11- 2019- IDA / 57180 Post Open - National 32,707.00 forage à PMH à EP lobokri et development support Quotations Envelope 8 d 06 01 04 08-30 à dahounga gholonguini, dans la Commune de Dziguilao CM-CRC EXTREME NORD- 111360-CW-RFB / Travaux de Construction d'un bloc de deux salles de classe Component A: Local Single Stage - One 207,364.0 160,942. 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-09- 2019- équipées et d'un bloc de IDA / 57180 Post Request for Bids Open - National Signed development support Envelope 0 65 01 09 06 18 10 17 11 22 30 11-19 latrines à trois compartiments à EP REBEDE EP LOBOKRI, (lot1) EP MBITOU et CES SOUEYE (lot2) dans la Commune de Dziguilao CM-CRC EXTREME NORD- 111319-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Request for Single Stage - One 41,717.1 Complete 2019-04- 2019-06- 2019-08- 2019- de deux salles de classe IDA / 57180 Post Open - National 47,483.00 development support Quotations Envelope 8 d 06 01 27 08-30 équipées et d'un bloc latrine à trois compartiments à l'EP de Ligazang, commune de Mindif CM-CRC EXTREME NORD- 111254-CW-RFQ / Travaux de Construction et équipement d'un centre de Component A: Local Request for Single Stage - One 132,500.0 102,729. 2019-04- 2019-06- 2019-08- 2019- IDA / 57180 Post Open - National Signed santé intégré avec development support Quotations Envelope 0 06 06 01 27 09-29 incinerateur et un bloc de latrines à trois compartiments à MATFAI, dans la commune de Mindif CM-CRC EXTREME NORD- 111382-CW-RFQ / Travaux de Construction d'un forage Component A: Local Request for Single Stage - One 32,342.7 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 Post Open - National 38,095.00 Signed pastoral a energie development support Quotations Envelope 0 06 01 07 08-30 photovoltaique au marché à bétail à Moulvoudaye CM-CRC EXTREME NORD- 111373-CW-RFB / Travaux d'aménagement du marché à bétail en contruisant un Component A: Local Request for Single Stage - One 42,683.0 2019-04- 2019-06- 2019-12- 2019- parc à betail une cloture un IDA / 57180 Post Open - National 56,123.00 Signed development support Quotations Envelope 7 06 01 08 09-29 quai d'embarquement et un bloc latrine a trois compartiments dans la Commune de Moulvoudaye. CM-CRC EXTREME NORD- 111380-CW-RFB / Travaux de Construction de 02 sdc et 3 latriness à EP Component A: Local Single Stage - One 234,082.0 186,401. 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-07- 2019-10- 2019- KAOSSERE, à l'EP Ticheeo IDA / 57180 Post Request for Bids Open - National Signed development support Envelope 0 14 01 02 06 18 31 17 01 22 11 10-20 Kolandi, à l'EP Tchoura-Bizili L1 et de 02 SDC EPB Touloum L2 et DE 2 SDC avec BUREAUX A L’EPP SAOTSAI L3 Cune de Touloum CM-CRC EXTREME NORD- 111358-CW-RFQ / Travaux de Construction d'un forage Component A: Local Request for Single Stage - One 13,255.7 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 Post Open - National 15,380.00 Signed équipé de PMH à lycee development support Quotations Envelope 0 06 01 26 07-31 bilingue dans la commue de Kaele CM-CRC EXTREME NORD- 111384-CW-RFQ / Travaux de Construction de 01 Component A: Local Request for Single Stage - One 31,562.3 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 Post Open - National 50,833.00 Signed forage à PMH à Gai gai, à EP development support Quotations Envelope 7 06 01 10 08-30 Golonpoui et à EP Kankwa, dans la commune de Datcheka CM-CRC EXTREME NORD- 111395-CW-RFQ / Travaux de Construction d'un bloc de 02 salles de classe Component A: Local Request for Single Stage - One 149,671.0 121,571. 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 Post Open - National Signed équipées et avec un bloc de development support Quotations Envelope 0 86 06 01 09 08-30 latrines à trois compartiments à EP Golonpoui , EP Kankrwa et EP Guidima , dans la commune de Datcheka CM-CRC EXTREME NORD- 111378-CW-RFQ / Travaux de Construction d'un bloc de deux salles de classe Component A: Local Request for Single Stage - One 175,994.0 67,097.9 2019-04- 2019-06- 2019-10- 2019- IDA / 57180 Post Open - National Signed équipées au CETIC de Vélé, development support Quotations Envelope 0 6 06 01 28 08-30 au CES de Widigue , au CES de Dabaye et au CES d'Agolla, dans la commune de Guémé CM-CRC EXTREME NORD- 111369-CW-RFQ / Travaux de Construction d'un hangar 52 places au marché de Component A: Local Request for Single Stage - One 57,109.6 2019-04- 2019-06- 2019-08- 2019- IDA / 57180 Post Open - National 67,637.00 Signed Gabaraye et Travaux de development support Quotations Envelope 1 06 01 27 08-30 Construction d'un bloc de latrines au marché de Gabaraye, commune de Guémé CM-CRC EXTREME NORD- 111362-CW-RFQ / Travaux de Construction d'un centre Component A: Local Request for Single Stage - One 127,436.0 106,966. 2019-04- 2019-06- 2019-10- 2019- IDA / 57180 Post Open - National Signed de santé intégré équipé et development support Quotations Envelope 0 95 06 01 08 09-29 un bloc de latrines au CSI à Nguéring, commune de Gueré CM-CRC EXTREME NORD- 111396-CW-RFQ / Component A: Local Request for Single Stage - One 27,215.6 2019-04- 2019-06- 2019-10- 2019- Construction d'un bloc de IDA / 57180 Post Open - National 32,708.00 Signed development support Quotations Envelope 4 06 01 09 08-30 05 boutiques au marché d'Ardaf Commune de Guere CM-CRC EXTREME NORD- 111388-CW-RFQ / Travaux de Construction d'un forage Component A: Local Request for Single Stage - One 12,359.6 2019-04- 2019-06- 2020-01- 2019- IDA / 57180 Post Open - National 15,311.00 Signed équipé de PMH à l'EP de development support Quotations Envelope 6 06 01 23 07-31 DAMA Djougong, commune de Kai kai CM-CRC EXTREME NORD- 111390-CW-RFQ / CONSTRUCTION DEUX Component A: Local Request for Single Stage - One 40,484.4 Complete 2019-04- 2019-06- 2019-08- 2019- IDA / 57180 Post Open - National 69,678.00 BLOCS DE CINQ (05) development support Quotations Envelope 0 d 06 01 22 08-30 BOUTIQUES AU MARCHÉ DE KALFOU, DANS LA COMMUNE DE KALFOU CM-CRC EXTREME NORD- 111371-CW-RFQ / Travaux de Construction d'un forage équipé de pompe à Component A: Local Request for Single Stage - One 57,350.2 2019-04- 2019-06- 2019-11- 2019- motricité humaine à Gandou IDA / 57180 Post Open - National 67,386.00 Signed development support Quotations Envelope 9 06 01 22 08-30 Golopo, au CES de Zaria, à Djada, réhabilitation d'un forage PMH à Delta Guibéré et Mandara, dans la commune de Kalfou CM-CRC EXTREME NORD- 111398-CW-RFQ / Under Component A: Local Request for Single Stage - One 2019-04- 2019-06- 2019- Équipement en matériel IDA / 57180 Post Open - National 16,804.00 0.00 Implemen development support Quotations Envelope 06 01 07-31 médicaux au CSI de Takreo tation yoldeo Commune Kar Hay CM-CRC EXTREME NORD- 111260-CW-RFQ / Electrification du nouveau Component A: Local Request for Single Stage - One 152,907.0 134,395. 2019-04- 2019-06- 2019-12- 2019- marché de Guirvidig (lot 01) IDA / 57180 Post Open - National Signed development support Quotations Envelope 0 99 06 01 06 09-29 et de la localité de Yangah (lot 02) , dans la commune de Maga CM-CRC EXTREME NORD- 111368-CW-RFQ / Travaux de Construction d'un forage Component A: Local Request for Single Stage - One 13,773.4 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 Post Open - National 15,759.00 Signed équipé de pompe à development support Quotations Envelope 0 06 01 06 07-31 motricité humaine à Bindiriel Danghou, commue de Tchatibali CM-CRC EXTREME NORD- 111259-CW-RFB / Travaux de Construction d'un bloc de 02 salles de classe équipées et d'un bloc de Component A: Local Single Stage - One 244,743.0 78,116.8 2019-04- 2019-05- 2019-04- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- 2019- latrines à IDA / 57180 Post Request for Bids Open - National Signed development support Envelope 0 5 01 02 06 18 13 17 14 22 23 11-19 troiscompartiments au CES Kamargui, à EP Goulourgou (lot 02), EP Bigi, EP de Djenreng (lot 02)et EP Waimou (lot 03) COMMUNE DE WINA CM-CRC EXTREME NORD- 111383-CW-RFQ / Travaux de Construction D’UN BLOC DE DEUX SALLES DE CLASSE Component A: Local Request for Single Stage - One 32,203.2 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 Post Open - National 96,762.00 Signed AVEC BUREAUX EQUIPES au development support Quotations Envelope 2 06 01 03 09-29 CES de DJOGOIDI et au lycee de Vounaloum Commune de yagoua CM-CRC EXTREME NORD- 111365-CW-RFQ / Travaux de Construction d'un hangar Component A: Local Request for Single Stage - One 56,945.7 2019-04- 2019-06- 2019-10- 2019- IDA / 57180 Post Open - National 76,074.00 Signed de 28 places et d'une development support Quotations Envelope 2 06 01 08 09-29 boucherie au marché de Velé, dans la commune de Guémé CM-CRC EXTREME NORD- 111374-CW-RFQ / Travaux Under de Construction de 01 Component A: Local Request for Single Stage - One 2019-04- 2019-06- 2019- IDA / 57180 Post Open - National 38,095.00 0.00 Implemen forage à énergie solaire à development support Quotations Envelope 06 01 08-30 tation CSI de Bosgoye, dans la commune de Wina CM-CRC EXTREME NORD- 111389-CW-RFQ / Travaux de Construction de 2 salles de classe et de latrines à l'EP de BIJE ( lot 01) , Component A: Local Request for Single Stage - One 80,535.3 2019-04- 2019-06- 2019-05- 2019- Construction de 2 salles de IDA / 57180 Post Open - National 96,542.00 Signed development support Quotations Envelope 6 06 01 27 08-30 classes à EPPB de TOKOMBERE et equipement en table bancs et bureaux au CES de makilingai (lot 02) dans la commune de Tokombere CM-CRC EXTREME NORD- 111392-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Request for Single Stage - One 55,757.8 Complete 2019-04- 2019-06- 2019-05- 2019- de deux salle de classe IDA / 57180 Post Open - National 67,299.00 development support Quotations Envelope 5 d 06 01 25 08-30 équipés et d'un bloc latrines à Magala Djamene dans la commune de Darak CM-CRC EXTREME NORD- 111385-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 10,462.3 Complete 2019-04- 2019-06- 2019-05- 2019- de Construction de 01 IDA / 57180 Post Open - National 19,048.00 development support Quotations Envelope 9 d 06 01 25 08-30 forage PMH à Magala Djamene, dans la commune de Darak CM-CRC EXTREME NORD- 111325-CW-RFB / Travaux de Construction d'un bloc de deux salles de classe Component A: Local Single Stage - One 226,885.0 94,907.5 2019-04- 2019-03- 2019-04- 2019-05- 2019-04- 2019-06- 2019-04- 2019-07- 2019-07- 2019- équipées et d'un bloc de IDA / 57180 Post Request for Bids Open - National Signed development support Envelope 0 3 01 28 06 18 24 17 25 22 10 11-19 latrines à trois compartiments à EP GADAFAI, au Lycée de Fotokol à EP Magadji et à EP de GUEGUERI, commune de Fotokol CM-CRC EXTREME NORD- 111261-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 31,367.2 Complete 2019-04- 2019-06- 2019-07- 2019- IDA / 57180 Post Open - National 34,286.00 de Construction d'un development support Quotations Envelope 5 d 06 01 02 08-30 magasin de stockage à Goulfey CM-CRC EXTREME NORD- 111367-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 30,637.2 2019-04- 2019-06- 2019-05- 2019- de Construction d'une mini IDA / 57180 Post Open - National 48,024.00 Signed development support Quotations Envelope 0 06 01 25 08-30 AEP pastorale à énergie solaire à fadja commune de Hilé Alifa CM-CRC EXTREME NORD- 111320-CW-RFQ / Travaux de Construction de 01 Component A: Local Request for Single Stage - One 36,050.5 Complete 2019-04- 2019-06- 2019-05- 2019- forage PMH à Michiska IDA / 57180 Post Open - National 49,510.00 development support Quotations Envelope 8 d 06 01 25 08-30 Mousgoum, OUNANGARE et NGADA 1, dans la commune de Logone Birni CM-CRC EXTREME NORD- 111327-CW-RFB / Travaux Component A: Local Request for Single Stage - One 40,199.6 2019-04- 2019-06- 2019-09- 2019- de Construction d'un IDA / 57180 Post Open - National 48,020.00 Signed development support Quotations Envelope 3 06 01 11 08-30 magasin de stockage à zigague, dans la commune de Waza CM-CRC EXTREME NORD- 111322-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 38,848.3 Complete 2019-04- 2019-06- 2019-07- 2019- de Construction d'un forage IDA / 57180 Post Open - National 50,855.00 development support Quotations Envelope 8 d 06 01 15 08-30 PMH à malia, NDIGUINA et MADA dans la commune de Waza Page 3 CM-CRC EXTREME NORD- 111377-CW-RFQ / Travaux d’extension du réseau électrique en moyenne Component A: Local Request for Single Stage - One 120,000.0 108,328. 2020-10- 2020-12- 2021-01- 2021- tension (MT) et basse IDA / 57180 Post Open - National Signed development support Quotations Envelope 0 90 05 16 08 12-31 tension (BT) triphasé et un transformateur H61 160 KVA dans les quartiers de Wourndé II et III, commune de Maroua 2 CM-CRC EXTREME NORD- 111376-CW-RFQ / Travaux d’electrification en moyenne Component A: Local Request for Single Stage - One 130,938.0 116,385. 2019-04- 2019-06- 2019-09- 2019- tension (MT) et basse IDA / 57180 Post Open - National Signed development support Quotations Envelope 0 17 06 01 02 09-29 tension (BT) monophasé de l'axe Barzao- barza foulbe- Barza-Guiziga, commune de Gazawa CM-CRC EXTREME NORD- 111355-CW-RFQ / Fourniture et installation de 07 lampadaires solaires Component A: Local Request for Single Stage - One 15,778.3 2019-04- 2019-06- 2019-08- 2019- composés de panneaux IDA / 57180 Post Open - National 19,048.00 Signed development support Quotations Envelope 5 06 01 27 07-31 solaires monocristallins et de batteries de type gel dans le centre urbain de vele commune DE GUEME CM-CRC EXTREME NORD- 111331-CW-RFQ / Travaux de Construction d'un forage Component A: Local Request for Single Stage - One 2019-04- 2019-06- 2019- IDA / 57180 Post Open - National 15,238.00 0.00 Canceled équipé de pompe à development support Quotations Envelope 06 01 07-31 motricité humaine a Djafgadjie, commue de yagoua CM-CRC EXTREME NORD- 111386-CW-RFQ / Travaux de Construction d'un CSI Component A: Local Request for Single Stage - One 152,381.0 2019-04- 2019-06- 2019- équipé avec case d'astreinte, IDA / 57180 Post Open - National 0.00 Canceled development support Quotations Envelope 0 06 01 09-29 un incinérateur et un bloc de latrines au CSI Djiddeo Garre, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 111433-CW-RFQ / Component A: Local Request for Single Stage - One 2019-09- 2019-11- 2020- IDA / 57180 Post Open - National 10,000.00 0.00 Canceled réalisation d'un parc à bétail development support Quotations Envelope 07 02 04-30 dans la commune de Wina (GP) CM-CRC EXTREME NORD- 111394-CW-RFQ / Travaux de Construction d’un forage Component A: Local Request for Single Stage - One 2019-04- 2019-06- 2019- IDA / 57180 Post Open - National 29,376.00 0.00 Canceled à énergie solaire avec development support Quotations Envelope 06 01 08-30 château au centre de santé de Djiddéo, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 111387-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 2019-04- 2019-06- 2019- de construction d'un forage IDA / 57180 Post Open - National 15,238.00 0.00 Canceled development support Quotations Envelope 06 01 07-31 pmh à l'EP Dolgaye Commune Kar Hay CM-CRC EXTREME NORD- 196682-CW-RFQ / Travaux de Construction d'un CSI Component A: Local Request for Single Stage - One 120,952.0 97,049.8 2020-11- 2021-01- 2021-01- 2021- équipé avec un incinérateur IDA / 57180 Post Open - National Signed development support Quotations Envelope 0 5 04 15 26 05-15 et un bloc de latrines au CSI Djiddeo Garre, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 196726-CW-RFQ / Travaux de Construction et Component A: Local Request for Single Stage - One 36,267.8 2020-11- 2021-01- 2021-01- 2021- équipement des blocs des IDA / 57180 Post Open - National 45,714.00 Signed development support Quotations Envelope 2 04 15 26 04-15 salles de classes et d'un bloc de latrines au CES de GUINADJI Commune de Maroua III CM-CRC EXTREME NORD- 196667-CW-RFQ / Travaux Under Component A: Local Request for Single Stage - One 10,958.0 2020-11- 2021-01- 2021-01- 2021- de Construction d’un forage IDA / 57180 Post Open - National 15,238.00 Implemen development support Quotations Envelope 5 04 15 26 03-16 PMH au centre de santé de tation Djiddéo Commune de Maroua III CM-CRC EXTREME NORD- 196678-CW-RFQ / REALISATION D’UN FORAGE EQUIPE DE POMPE A MOTRICITE HUMAINE A Under Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- GUIVEL, QUARTIER MERI IDA / 57180 Post Open - National 57,244.00 0.00 Implemen development support Quotations Envelope 04 15 04-15 CENTRE ET KILWO-VALTA tation ET L’ACHEVEMENT DE LA CONSTRUCTION DES FORAGES DE GADJAWAI ET NGUISSAR DANS LA COMMUNE DE MERI CM-CRC EXTREME NORD- 196722-CW-RFQ / Travaux de CONSTRUCTION D’UN Pending FORAGE PASTORAL A Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 Post Open - National 41,546.00 0.00 Implemen ENERGIE SOLAIRE EQUIPE development support Quotations Envelope 04 15 04-15 tation D’UN château ET DE (02) ABREUVOIRS DANS LA LOCALITE DE DJONGDONG, COMMUNE DE WINA CM-CRC EXTREME NORD- 196718-CW-RFQ / Travaux Pending de Construction de 01 Component A: Local Request for Single Stage - One 2020-10- 2020-12- 2021- IDA / 57180 Post Open - National 38,095.00 0.00 Implemen forage à énergie solaire à development support Quotations Envelope 05 16 03-16 tation CSI de Bosgoye, dans la commune de Wina CM-CRC EXTREME NORD- 196724-CW-RFQ / Travaux de CONSTRUCTION D’UN FORAGE PASTORAL A Component A: Local Request for Single Stage - One 36,344.1 2020-11- 2021-01- 2021-01- 2021- IDA / 57180 Post Open - National 40,000.00 Signed ENERGIE SOLAIRE EQUIPE development support Quotations Envelope 7 04 15 26 04-15 D’UN château ET DE (02) ABREUVOIRS DANS LA LOCALITE DE MIZILING WAILA MAYO, COMMUNE DE GAZAWA CM-CRC EXTREME NORD- 196687-CW-RFQ / Travaux Component A: Local Request for Single Stage - One 14,150.1 2020-11- 2021-01- 2021-01- 2021- de Construction d'un forage IDA / 57180 Post Open - National 15,631.00 Signed development support Quotations Envelope 2 04 15 08 03-16 équipé de PMH de Yonkolel Commune de Dargala. CM-CRC EXTREME NORD- 196720-CW-RFQ / Travaux de Construction d'un forage Under équipé de PMH à lalepaki et Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 Post Open - National 17,143.00 0.00 Implemen Acquisition d’une caisse à development support Quotations Envelope 04 15 03-16 tation outils pour l’entretien des forages dans la commune de Commune de Touloum CM-CRC EXTREME NORD- 196723-CW-RFQ / TRAVAUX DE CONSTRUCT D’UN BLOC DE 2 SALLES DE CLASSE EQUIPEES ET D’UN Under Component A: Local Request for Single Stage - One 2020-11- 2021-03- 2021- BLOC DE LATRINES À L'EP IDA / 57180 Post Open - National 87,964.00 0.00 Implemen development support Quotations Envelope 04 16 06-14 TCHOURA-BIZILI ET tation CONSTRUCTION D'UN BLOC DE 02 SALLES DE CLASSE ÉQUIPÉES À EP BILINGUE DE TOULOUM COMMUNE DE TOULOUM CM-CRC EXTREME NORD- 196721-CW-RFQ / TRAVAUX DE CONSTRUCTION D’UN BLOC Pending Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- DE DEUX SALLES DE CLASSE IDA / 57180 Post Open - National 45,113.00 0.00 Implemen development support Quotations Envelope 04 15 04-15 EQUIPEES ET D’UN BLOC DE tation LATRINES À TROIS COMPARTIMENTS à l'EP de ZANYAO Commune de YAGOUA CM-CRC EXTREME NORD- 196681-CW-RFQ / Travaux de Construction d’un forage équipé de pompe à Component A: Local Request for Single Stage - One 71,202.8 2020-11- 2021-01- 2021-01- 2021- IDA / 57180 Post Open - National 80,952.00 Signed motricité humaine à Dinao, development support Quotations Envelope 6 04 15 08 04-15 Louggol palé, Kodadjiho, Hamadalao et Golombeswé Commune KALFOU CM-CRC EXTREME NORD- 196688-CW-RFQ / Travaux Pending de Construction d'un forage Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 Post Open - National 32,381.00 0.00 Implemen équipé de PMH à douang et development support Quotations Envelope 04 15 03-16 tation dingue-Gabaraye Commune de Gueme CM-CRC EXTREME NORD- 196677-CW-RFQ / Réalisation d’un (01) forage Component A: Local Request for Single Stage - One 41,275.2 2020-11- 2021-01- 2021-01- 2021- pastoral photovoltaïque et IDA / 57180 Post Open - National 47,200.00 Signed development support Quotations Envelope 8 04 15 08 04-15 de deux abreuvoirs au lieu- dit KOLOFATA GUIDI dans la commune de KOLOFATA CM-CRC EXTREME NORD- 196719-CW-RFQ / Travaux Under Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- de construction d'un forage IDA / 57180 Post Open - National 13,742.00 0.00 Implemen development support Quotations Envelope 04 15 04-15 équipé de PMH à Koulang tation Commune de MORA CM-CRC EXTREME NORD- 196685-CW-RFQ / Travaux de Construction d'un forage Component A: Local Request for Single Stage - One 14,195.0 2020-10- 2020-12- 2021-01- 2021- IDA / 57180 Post Open - National 16,190.00 Signed équipé de pompe à development support Quotations Envelope 1 05 16 08 02-14 motricité humaine à Guermé Kalfou Commune de Kalfou CM-CRC EXTREME NORD- 196671-CW-RFQ / Travaux de Construction d'un bloc de deux salle de classe Under équipées à l'EPB DE MADA Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 Post Open - National 95,238.00 0.00 Implemen KOLKOCH ET A LEP development support Quotations Envelope 04 15 05-15 tation MAMBEZA et Construction d'un bloc de latrines à l'EPB DE MADA KOLKOCH ET Commune de Tokombere CM-CRC EXTREME NORD- 196727-CW-RFQ / TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR Pending LA CONSTRUCTION DE 04 Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 Post Open - National 95,238.00 0.00 Implemen GUICHETS, 04 MAGASINS, development support Quotations Envelope 04 15 05-15 tation D’UN HANGAR D’ATTENTE ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE COMMUNE DE YAGOUA CM-CRC EXTREME NORD- 204463-CW-RFQ / travaux de construction d’un bloc Component A: Local Request for Single Stage - One 48,124.0 2020-12- 2021-02- 2021-01- 2021- de deux salles de classe IDA / 62240 Post Open - National 57,142.86 Signed development support Quotations Envelope 6 01 02 15 06-02 équipées avec bloc latrines à à l’EP d’Afadé Groupe 2 Commune Makary CM-CRC EXTREME NORD- Component C: 196964-CW-RFQ / Coordination, management, Request for Single Stage - One 2020-11- 2020-12- 2021- Aménagement d'un parking IDA / 62240 Post Limited 5,000.00 0.00 Canceled monitoring and evaluation Quotations Envelope 04 30 01-29 additionnel et des bureaux and communication de la crc-EN à maroua CM-CRC EXTREME NORD- 196679-CW-RFQ / Travaux de Construction d'un dalot mixte (BA et Beton Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 Post Open - National 62,857.00 0.00 Canceled cyclopeen) de 2x2,5x6 m de development support Quotations Envelope 04 15 05-15 franchissement de 5 ml et 22 m de portée sur le mayo- Guili Commune de Bourha. CM-CRC EXTREME NORD- 196672-CW-RFQ / REALISATION D’UN FORAGE Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 Post Open - National 15,238.00 0.00 Canceled EQUIPE DE POMPE A development support Quotations Envelope 04 15 03-16 MOTRICITE HUMAINE A Dolgaye Commune Kar Hay CM-CRC EXTREME NORD- 196725-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 Post Open - National 43,810.00 0.00 Canceled de deux salles de classe development support Quotations Envelope 04 15 04-15 équipées au lycee de Goundaye Commune de Dziguilao. CM-CRC EXTREME NORD- 196686-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021- de 02 salles de classe IDA / 57180 Post Open - National 48,949.00 0.00 Canceled development support Quotations Envelope 04 15 04-15 équipées et d'un bloc de latrines à trois compartiments a EP Waimou COMMUNE DE WINA CM-CRC EXTREME NORD- 222521-CW-RFQ / travaux de construct et équipement Pending Component A: Local Request for Single Stage - One 152,380.0 2021-04- 2021-06- 2021- d’une salle d’hospitalisation IDA / 62240 Post Open - National 0.00 Implemen development support Quotations Envelope 0 13 08 10-06 et d'un bloc opératoire au tation CMA de Logone birni Commune de Logone birni CM-CRC EXTREME NORD- 222525-CW-RFQ / travaux de construct d’1 bloc maternel et latrines à EM Pending Component A: Local Request for Single Stage - One 148,470.0 2021-04- 2021-06- 2021- Logone birni (lot 01) et IDA / 62240 Post Open - National 0.00 Implemen development support Quotations Envelope 0 13 08 10-06 Réhabilitation de 6 salles de tation classe avec bureau attenant et équipement a EP Logone birni GPE 1 A (lot 02) Commune de Logone birni CM-CRC EXTREME NORD- 222842-CW-RFQ / Travaux de construct et équipement Pending Component A: Local Request for Single Stage - One 152,380.0 2021-04- 2021-06- 2021- d’une salle d’hospitalisation IDA / 62240 Post Open - National 0.00 Implemen development support Quotations Envelope 0 13 08 10-06 et d'un bloc opératoire au tation CMA de Fotokol Commune de Fotokol (A2011B1) CM-CRC EXTREME NORD- 222748-CW-RFQ / Travaux de construct d’un forage équipé de pompe à Pending Component A: Local Request for Single Stage - One 2021-04- 2021-06- 2021- motricité humaine à Mada IDA / 62240 Post Open - National 73,180.00 0.00 Implemen development support Quotations Envelope 13 08 10-06 (Ngroh), à Goura 2 tation (Mosquée), à Labado, à Chou et réhabilitation d’un forage à Mada 1 (quartier Sara) Commune de Makary CM-CRC EXTREME NORD- 222522-CW-RFQ / Travaux Pending Component A: Local Request for Single Stage - One 2021-04- 2021-06- 2021- de construct d’une mini AEP IDA / 62240 Post Open - National 38,020.00 0.00 Implemen development support Quotations Envelope 13 08 10-06 au camp des réfugiés tation d’Afadé Commune de Makary CM-CRC EXTREME NORD- 222828-CW-RFQ / Travaux Pending Component A: Local Request for Single Stage - One 2021-04- 2021-06- 2021- de construct d’un forage IDA / 62240 Post Open - National 21,915.00 0.00 Implemen development support Quotations Envelope 13 08 09-06 équipé de PMH à Tagawa tation Commune de Waza CM-CRC EXTREME NORD- 222782-CW-RFQ / Travaux de réalisation d’un forage productif équipé de pompe à motricité humaine dans Pending Component A: Local Request for Single Stage - One 2021-04- 2021-06- 2021- les localités de : YEME, IDA / 62240 Post Open - National 96,820.00 0.00 Implemen development support Quotations Envelope 13 08 10-06 DANDAYA, KOLDIMA, tation MADJINA et MEHE EMMA (Camp refugié) dans la Commune de Mora, Département du Mayo Sava. CM-CRC EXTREME NORD- 222778-CW-RFQ / Travaux de construct d’1 logement d'astreint et d'un mur de Pending cloture à l’EP IGAWA MEME Component A: Local Request for Single Stage - One 198,220.0 2021-04- 2021-06- 2021- IDA / 62240 Post Open - National 0.00 Implemen (lot1) et de construct de 4 development support Quotations Envelope 0 13 08 10-06 tation salles de classe équipées avec 1 bureau attenant et de latrines à l’EP de KOTCHEREHE (lot 02) Commune de Mora CM-CRC EXTREME NORD- 222959-CW-RFQ / TRAVAUX DE construct D’UN BLOC DE DEUX SALLES DE CLASSE EQUIPEES AVEC Pending BUREAU ET D’UN BLOC Component A: Local Request for Single Stage - One 189,335.0 2021-04- 2021-06- 2021- IDA / 62240 Post Open - National 0.00 Implemen LATRINE A TROIS development support Quotations Envelope 0 13 08 06-20 tation COMPARTIMENTS A L’EPB DE KOSSEHONE, L'EP WANDAI (lot 01) ET L'EP NDROCK (lot 02) DANS LA COMMUNE DE MOKOLO, DEPARTEMENT DU MAYO-TSANAGA. CM-CRC EXTREME NORD- 222785-CW-RFQ / Travaux de construct de 01 forage à Pending Component A: Local Request for Single Stage - One 2021-04- 2021-06- 2021- Zamai, à Ldagodja-Tourou, IDA / 62240 Post Open - National 67,115.00 0.00 Implemen development support Quotations Envelope 13 08 10-06 à Ngolkodjala-Kosséhone et tation à Wandaï-djamboutou Commune de Mokolo Page 4 CM-CRC EXTREME NORD- 222977-CW-RFQ / TRAVAUX DE construct ET Pending EQUIPEMENT DU CENTRE DE Component A: Local Request for Single Stage - One 152,380.0 2021-04- 2021-06- 2021- IDA / 62240 Post Open - National 0.00 Implemen SANTE INTEGRE A development support Quotations Envelope 0 13 08 06-20 tation KOSSEHONE DANS LA COMMUNE DE MOKOLO, DEPARTEMENT DU MAYO- TSANAGA.(A2011B1) CM-CRC EXTREME NORD- 222983-CW-RFQ / Travaux Pending de Construction de 01 Component A: Local Request for Single Stage - One 2021-04- 2021-06- 2021- IDA / 57180 Post Open - National 34,286.00 0.00 Implemen forage à énergie solaire au development support Quotations Envelope 13 08 09-06 tation CSI de hile haoussa, dans la commune de kousseri (A2031C1) CM-CRC EXTREME NORD- 228212-CW-RFQ / travaux de construction d'un bloc Pending Component A: Local Request for Single Stage - One 2021-05- 2021-07- 2021- latrines a troix IDA / 57180 Post Open - National 9,000.00 0.00 Implemen development support Quotations Envelope 10 05 09-03 compartiement et tation construction d'un incinerateur au CSI de hile haoussa dans la Commune de kousseri CM-CRC EXTREME NORD- 237615-CW-RFQ / construct de 6 SDC équipées avec bureau et Request for Pending latrines à EP de BIAMO (lot Component A: Local Request for Single Stage - One 285,350.0 2021-06- 2021-08- 2022- IDA / 62240 Post Open - National Quotations (Non 0.00 Implemen 01) construct de 2 SDC avec development support Quotations Envelope 0 06 01 01-28 Bank-SPD) tation bureau a EP GRP 2 de BODO (lot 02) construct de 2 SDC avec bureau et latrines a EP de DJAMOUS (lot 03) Commune de Makary CM-CRC EXTREME NORD- 237617-CW-RFQ / travaux de construct de 4 salles de classe équipées avec 2 Request for Pending Component A: Local Request for Single Stage - One 253,980.0 2021-06- 2021-08- 2022- bureau à EP Fotokol (lot 01) IDA / 62240 Post Open - National Quotations (Non 0.00 Implemen development support Quotations Envelope 0 06 01 01-28 et construct de 4 salles de Bank-SPD) tation classe équipées avec 2 bureau et de 3 blocs de latrines à EP Fotokol (lot 02) Commune de Fotokol GOODS Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual CM-CRC EXTREME NORD- 7991-GO-RFQ / Acquisition Component C: des fournitures de bureaux Coordination, management, Request for Single Stage - One 2017-03- 2017-05- 2017-05- 2017-06- 2017-05- IDA / 57180 Post Limited 10,000.00 8,556.39 Signed du matériels d'entretien et monitoring and evaluation Quotations Envelope 10 26 05 22 19 des fournitures diverses à la and communication CRC, Région de l'Extrême- Nord CM-CRC EXTREME NORD- 8000-GO-RFQ / Acquisition des consomables Component C: Informatiques (Encres, clés Coordination, management, Request for Single Stage - One 2017-03- 2017-05- 2017-05- 2017-07- 2017-05- IDA / 57180 Post Limited 10,000.00 5,074.65 Signed internet, CD, 2 disques durs monitoring and evaluation Quotations Envelope 10 26 05 22 19 externes Tera, 9 clés USB, and communication antivirus) à la CRC, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 8001-GO-RFQ / Acquisition des fournitures pour Component C: véhicules ((5pneusX3véh), 3 Coordination, management, Request for Single Stage - One 2017-03- 2017-05- 2017-05- boîtes à pharmacie, 3 IDA / 57180 Post Limited 10,000.00 0.00 Canceled monitoring and evaluation Quotations Envelope 10 05 19 extincteurs,3 pelles, 6 and communication paires de gants, 3machettes, 3manteaux...) à la CRC, Région de l'Extrême- Nord CM-CRC EXTREME NORD- Component C: 8003-GO-RFQ / acquisition, Coordination, management, Request for Single Stage - One 2017-03- 2017-12- 2017-05- 2017-12- 2017-07- 2018-01- IDA / 57180 Post Limited 9,000.00 4,880.26 Completed aménagement et monitoring and evaluation Quotations Envelope 10 04 05 29 04 19 équipement de 2 conteneurs and communication de 40 pieds Component C: CM-CRC EXTREME NORD- Coordination, management, Request for Single Stage - One 2017-03- 2017-10- 2017-05- 2017-12- 2017-06- 2018-01- 8006-GO-RFQ / aquisition IDA / 57180 Post Limited 6,000.00 5,492.69 Completed monitoring and evaluation Quotations Envelope 10 03 05 22 04 15 et installation de 10 splits and communication CM-CRC EXTREME NORD- 8008-GO-RFQ / acquisition Component C: du kit à outils du Coordination, management, Request for Single Stage - One 2017-03- 2017-05- 2017-06- CCI(scléromètre, lazermètre, IDA / 57180 Post Limited 1,500.00 0.00 Canceled monitoring and evaluation Quotations Envelope 10 05 04 odomètre, pi à coulisse and communication électronique, EPI, Gilets de sauvetage CM-CRC EXTREME NORD- 8009-GO-RFQ / fourniture des services de maintenance Component C: électrique, climatiseurs, Coordination, management, Request for Single Stage - One 2017-03- 2017-05- 2017-05- 2017-07- 2018-05- IDA / 57180 Post Limited 4,800.00 2,176.75 Signed groupe électrogène, monitoring and evaluation Quotations Envelope 10 26 05 24 05 plolmberie et menuiserie à and communication la CRC, Région de l'Extrême- Nord CM-CRC EXTREME NORD- 38389-GO-RFQ / Equipement en table bancs, tables et chaise pour Component A: Local Request for Single Stage - One 2017-12- 2017-12- 2018-01- 2018-04- 2018-04- Enseignants et armoires au IDA / 57180 Post Limited 16,265.00 12,882.93 Signed development support Quotations Envelope 02 19 27 09 27 CETIC de Mogodé, à l'EP de SIR, à l'EPB de Rhoumsiki et à l'EP de Tchanawa dans la commune de Mogode CM-CRC EXTREME NORD- 58709-GO-RFQ / Acquisition des consomables Informatiques Component A: Local Request for Single Stage - One 2017-10- 2017-10- 2017-12- 2017-12- 2017-12- IDA / 57180 Post Limited 2,600.00 1,816.76 Signed (Encres, clés internet, CD, 2 development support Quotations Envelope 08 03 03 07 17 disques durs externes Tera, 9 clés USB, antivirus) à la CRC, Région de l'Extrême- Nord VAGUE 2 CM-CRC EXTREME NORD- 58529-GO-RFP / Fourniture d' une pirogue à moteur 30CV type E40GMHL (avec coque en fibre de verre) et Component A: Local Request for Single Stage - One 2018-05- 2018-06- 2018-07- 2018-10- 2018-08- 2018-12- IDA / 57180 Post Limited 26,974.00 25,881.80 Completed des équipements annexes: development support Quotations Envelope 06 13 01 23 30 21 portes tout tricycle tractable, pagaies, gilets de sauvetage, panneaux de labelisation) dans la cmne de KAIKAI CM-CRC EXTREME NORD- 111400-GO-RFQ / Fourniture en mobilier et Component A: Local Request for Single Stage - One 2019-04- 2019-06- 2019-08- 2019-07- petit materiel sanitaire de IDA / 57180 Post Open - National 49,494.00 38,928.38 Signed development support Quotations Envelope 06 01 27 31 CSI de Mindif, de Modjombodi, de Maoudine et de Mogom dans la commune de Mindif. CM-CRC EXTREME NORD- 196822-GO-RFQ / Fourniture et installation de Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021-01- 2021-04- 39 lampadaires a énergie IDA / 57180 Post Open - National 89,143.00 68,717.03 Signed development support Quotations Envelope 04 15 08 15 solaire dont 10 à Ndoukoula,14 à Dagaï Kola et de 15 à Loulou Commune de Ndoukoula CM-CRC EXTREME NORD- 196840-GO-RFQ / Fourniture et l'installation Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021-01- 2021-07- IDA / 57180 Post Open - National 16,571.00 12,009.59 Signed de 3 poteaux solaires à development support Quotations Envelope 04 15 08 14 Ouro Bone et 03 à Modjombodi Commune de Mindif. CM-CRC EXTREME NORD- 196835-GO-RFQ / Fourniture et installation de Component A: Local Request for Single Stage - One 2020-11- 2020-12- 2021-01- 2021-03- IDA / 57180 Post Open - National 31,429.00 27,298.43 Signed 12 poteaux solaires de l’axe development support Quotations Envelope 04 30 08 30 Sous-préfecture- Ngaoundéréo Commune de Kalfou CM-CRC EXTREME NORD- 196829-GO-RFQ / Pending Fourniture et installation Component A: Local Request for Single Stage - One 2020-11- 2020-12- 2021-02- IDA / 57180 Post Limited 9,905.00 0.00 Implement d’un kit solaire pour development support Quotations Envelope 04 30 28 ation l’alimentation en energie électrique du lycée de gabaraye. Commune Gueme. CM-CRC EXTREME NORD- Component C: Under 196917-GO-RFQ / Coordination, management, Request for Single Stage - One 2020-11- 2020-12- 2021-01- IDA / 62240 Post Limited 9,000.00 0.00 Implement Fourniture et installation monitoring and evaluation Quotations Envelope 04 30 29 ation des stores et moquettes à la and communication CRC EN CM-CRC EXTREME NORD- 196937-GO-RFQ / Fourniture et installation du Component C: matériel informatique (5 Under Coordination, management, Request for Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- ordinateurs portables pour IDA / 62240 Post Limited 18,000.00 0.00 Implement monitoring and evaluation Quotations Envelope 04 09 30 29 CR, RRSE, CPTR, CCI2 et ation and communication ARPM) et de reprographie (deux photocopieurs professionnels) à la CRC de l’Extrême-nord CM-CRC EXTREME NORD- 196954-GO-RFQ / Achat de Component C: matériels, équipements et Pending Coordination, management, Request for Single Stage - One 2020-11- 2020-12- 2021-01- mobilier de bureaux(chaises IDA / 62240 Post Limited 8,400.00 0.00 Implement monitoring and evaluation Quotations Envelope 04 30 29 réception(20), fauteuil ation and communication directeur(10), 2bureaux) à la CRC Région de l'Extrême- Nord CM-CRC EXTREME NORD- 196957-GO-RFQ / Component C: Acquisition des fournitures Coordination, management, Request for Single Stage - One 2020-11- 2020-11- 2020-12- 2020-12- 2021-01- IDA / 62240 Post Limited 8,000.00 7,316.27 Signed de bureaux et divers pour le monitoring and evaluation Quotations Envelope 04 26 30 14 29 compte de la CRC, Région and communication de l'Extrême-Nord CM-CRC EXTREME NORD- Component C: 196959-GO-RFQ / Coordination, management, Request for Single Stage - One 2020-11- 2020-10- 2020-12- 2020-12- 2021-06- Fourniture des services de IDA / 62240 Post Limited 4,937.00 8,659.75 Signed monitoring and evaluation Quotations Envelope 04 26 30 31 28 gardiennage à la CRC, and communication Région de l'Extrême-Nord CM-CRC EXTREME NORD- 196961-GO-RFQ / Fournture de service de Maintenance informatique Component C: (photocopieur, scanner, Coordination, management, Request for Single Stage - One 2020-11- 2020-10- 2020-12- 2020-12- 2021-12- IDA / 62240 Post Limited 4,800.00 4,428.86 Signed ordinateur portable , monitoring and evaluation Quotations Envelope 04 26 30 31 25 desktop et copieur à la CRC- and communication EN lot 01 et maintenance électricité, climatisseur, groupe électrogène et plomberie lot 02 à la CRC- EN CM-CRC EXTREME NORD- 196962-GO-RFQ / Acquisition de 6 Kits solaires pour les communes Component B: Support to Pending Request for Single Stage - One 2020-11- 2021-02- 2021-07- de Mora, Fotokol, Makary, IDA / 62240 the decentralization Post Open - National 69,600.00 0.00 Implement Quotations Envelope 21 01 31 Logone Birni, mokolo et process ation Waza pour le fonctionnement de SIMBA dans la Region de l'Extreme- nord CM-CRC EXTREME NORD- 204462-GO-RFQ / Pending Component A: Local Request for Single Stage - One 2020-12- 2021-02- 2021-04- fourniture en equipements IDA / 62240 Post Open - National 60,000.00 0.00 Implement development support Quotations Envelope 01 02 03 et medicaments aux CSI de ation Zizagué et CSI de Waza CM-CRC EXTREME NORD- 204459-GO-RFQ / fourniture en equipements Under Component A: Local Request for Single Stage - One 2020-12- 2021-02- 2021-04- et medicaments aux CSI de IDA / 62240 Post Open - National 60,000.00 0.00 Implement development support Quotations Envelope 01 02 03 Kossa et au CSI de Méhé ation Emma dans la commune de Commune de Mora CM-CRC EXTREME NORD- 196810-GO-RFQ / Fourniture en Equipement en 60 tables bancs et un Component A: Local Request for Single Stage - One 2020-11- 2020-12- 2021-02- IDA / 57180 Post Limited 9,905.00 0.00 Canceled bureau à l'EP Guinlaye et development support Quotations Envelope 04 30 28 111 tables bancs et un bureau à l'EP BOGO SIRATARE I Commune de BOGO CM-CRC EXTREME NORD- 196816-GO-RFQ / Fourniture en équipement Component A: Local Request for Single Stage - One 2020-10- 2020-12- 2021-02- en 200 tables bancs, 4 IDA / 57180 Post Open - National 12,952.00 0.00 Canceled development support Quotations Envelope 05 16 14 bureaux, 4 chaises rembourrées et 4 armoires à l'EP MAGA IIB Commune de Maga. CM-CRC EXTREME NORD- 196797-GO-RFQ / Component A: Local Request for Single Stage - One 2020-11- 2021-01- 2021-03- Fourniture en Équipement IDA / 57180 Post Open - National 12,801.00 0.00 Canceled development support Quotations Envelope 04 15 16 en matériel médicaux au CSI de Takreo yoldeo Commune Kar Hay CM-CRC EXTREME NORD- Component C: 222789-GO-RFQ / Pending Coordination, management, Request for Single Stage - One 2021-04- 2021-06- 2021-12- Fourniture de Achat de 3 IDA / 62240 Post Limited 6,000.00 0.00 Implement monitoring and evaluation Quotations Envelope 13 08 05 scanners professionnels à la ation and communication CRC de l’Extrême-nord ( C101203) CM-CRC EXTREME NORD- 222792-GO-RFQ / Component C: Pending Acquisition de Coordination, management, Request for Single Stage - One 2021-04- 2021-06- 2021-07- IDA / 62240 Post Limited 15,000.00 0.00 Implement consommables monitoring and evaluation Quotations Envelope 13 08 08 ation informatiques et autres and communication fournitures dela CRC, Région de l'EN ( C101303) CM-CRC EXTREME NORD- 222730-GO-RFQ / Component C: Pending Acquisition des fournitures Coordination, management, Request for Single Stage - One 2021-04- 2021-06- 2021-07- IDA / 62240 Post Limited 9,000.00 0.00 Implement de bureaux et divers pour le monitoring and evaluation Quotations Envelope 13 08 08 ation compte de la CRC, Région and communication de l'Extrême-Nord (C101301) CM-CRC EXTREME NORD- 222841-GO-RFQ / Component C: Pending Acquisition des fournitures Coordination, management, Request for Single Stage - One 2021-04- 2021-06- 2021-12- IDA / 62240 Post Limited 4,935.00 0.00 Implement pour véhicules à la CRC, monitoring and evaluation Quotations Envelope 13 08 05 ation Région de l'Extrême-Nord and communication (C101304) CM-CRC EXTREME NORD- 222795-GO-RFQ / Component C: Pending Acquisition d'un vehicule Coordination, management, Request for Single Stage - One 2021-04- 2021-06- 2021-08- IDA / 62240 Post Open - National 50,000.00 0.00 Implement pick up pour le compte de monitoring and evaluation Quotations Envelope 13 08 07 ation la CRC, Région de l'Extrême- and communication Nord (C101205) CM-CRC EXTREME NORD- 222798-GO-RFQ / FOURNITURE ET INSTALLATION D’UNE MINI Pending CENTRALE SOLAIRE AU CSI Component A: Local Request for 2021-04- 2021-06- 2021-09- IDA / 62240 Post 56,935.00 0.00 Implement DE KOSSA, DANS LA development support Quotations 13 08 06 ation COMMUNE DE MORA, DEPARTEMENT DU MAYO- SAVA, REGION DE L’EXTREME – NORD. (A2011B1) NON CONSULTING SERVICES Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual CM-CRC EXTREME NORD- 111430-NC-RFQ / Selection d'une agence d'edition pour la production d'un bulletin Component A: Local Request for Single Stage - One 2019-06- 2019-08- 2019-11- 2020-08- IDA / 57180 Post Open - National 47,000.00 31,781.53 Signed trimestriel d'informations development support Quotations Envelope 09 04 15 03 communales(47 communes) dans la region de l'Extreme- nord CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual CM-CRC EXTREME NORD- 8076-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- 2020-08- IDA / 57180 the decentralization Post Qualification Open - National 63,060.00 20,007.04 Completed l'actualisation du PCD de la 10 04 31 14 10 13 22 18 06 14 05 process Selection commune de Guéré, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 8082-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- IDA / 57180 the decentralization Post Qualification Open - National 26,970.00 22,183.49 Signed l'actualisation du PCD de la 10 04 31 14 10 13 22 18 11 14 process Selection commune de Kalfou, Région de l'Extrême-Nord Page 5 CM-CRC EXTREME NORD- 8088-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- IDA / 57180 the decentralization Post Qualification Open - National 63,060.00 18,355.82 Signed l'actualisation du PCD de la 10 04 31 14 09 13 22 18 06 14 process Selection commune de Mindif, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 8094-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- IDA / 57180 the decentralization Post Qualification Open - National 53,760.00 30,571.90 Signed l'actualisation du PCD de la 10 04 31 14 10 13 27 18 06 14 process Selection commune de Gazawa., Région de l'Extrême-Nord CM-CRC EXTREME NORD- 8093-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-06- 2018-05- IDA / 57180 the decentralization Post Qualification Open - National 15,570.00 29,601.16 Signed l'actualisation du PCD de la 10 04 31 14 09 13 22 18 27 14 process Selection commune de Guidiguis, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 8097-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- IDA / 57180 the decentralization Post Qualification Open - National 57,600.00 18,445.45 Signed l'actualisation du PCD de la 10 04 31 14 10 13 27 18 06 14 process Selection commune de Dargala, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29268-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- 2020-08- IDA / 57180 the decentralization Post Qualification Open - National 63,060.00 8,628.26 Completed l'actualisation du PCD de la 20 04 11 24 10 24 22 28 06 24 05 process Selection commune de WINA, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29270-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 26,460.00 29,798.62 Signed l'actualisation du PCD de la 20 23 11 24 09 24 27 28 16 24 process Selection commune de BOURHA, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29272-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 63,060.00 23,663.61 Signed l'actualisation du PCD de la 20 04 11 24 10 24 27 28 06 24 process Selection commune de Hina, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29273-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-06- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 15,570.00 9,919.43 Signed l'actualisation du PCD de la 20 04 11 24 10 24 27 28 25 24 process Selection commune de Koza, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29274-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 53,760.00 37,441.16 Signed l'actualisation du PCD de la 20 04 11 24 10 24 27 28 06 24 process Selection commune de Mozogo., Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29276-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-10- 2017-11- 2017-12- 2018-01- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 57,600.00 0.00 Canceled l'actualisation du PCD de la 20 11 24 24 28 24 process Selection commune de Kolofata, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29277-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-01- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 57,600.00 0.00 Canceled l'actualisation du PCD de la 20 04 11 24 10 24 28 24 process Selection commune de Kolofata, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29280-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-10- 2017-11- 2017-12- 2018-01- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 26,970.00 0.00 Canceled l'actualisation du PCD de la 20 11 24 24 28 24 process Selection commune de Goulfey, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29281-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-10- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 26,460.00 17,141.65 Signed l'actualisation du PCD de la 20 04 11 24 14 24 22 28 06 24 process Selection commune de FOTOKOL, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29282-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- 2020-08- IDA / 57180 the decentralization Post Qualification Open - National 63,060.00 -2,518.29 Completed l'actualisation du PCD de la 20 04 11 24 15 24 20 28 06 24 05 process Selection commune de Blangoua, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29284-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- IDA / 57180 the decentralization Post Qualification Open - National 15,570.00 31,593.26 Signed l'actualisation du PCD de la 20 04 11 24 15 24 22 28 11 24 process Selection commune de Darak, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 8089-CS-CQS / sélection Component B: Support to Consultant d'un consultant pour 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- IDA / 57180 the decentralization Post Qualification Open - National 26,460.00 19,922.77 Signed l'actualisation du PCD de la 15 28 06 19 07 18 21 23 01 19 process Selection commune de Datcheka, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29269-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- IDA / 57180 the decentralization Post Qualification Open - National 26,970.00 18,485.99 Signed l'actualisation du PCD de la 15 28 06 19 07 18 21 23 01 19 process Selection commune de TCHATIBALI, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29278-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- 2020-08- IDA / 57180 the decentralization Post Qualification Open - National 63,060.00 -1,222.01 Completed l'actualisation du PCD de la 15 28 06 19 10 18 21 23 01 19 05 process Selection commune de Waza, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29285-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- IDA / 57180 the decentralization Post Qualification Open - National 53,760.00 1,279.72 Signed l'actualisation du PCD de la 15 28 06 19 10 18 21 23 01 19 process Selection commune deHILE-ALIFA., Région de l'Extrême-Nord CM-CRC EXTREME NORD- 58613-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- 2020-08- IDA / 57180 the decentralization Post Qualification Open - National 26,070.00 24,573.33 Completed l'actualisation du PCD de la 15 28 06 19 10 18 21 23 01 19 05 process Selection cmne de Goulfey, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 58629-CS-CQS / Sélection Component B: Support to Consultant d'un consultant pour 2018-06- 2018-10- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- 2020-08- IDA / 57180 the decentralization Post Qualification Open - National 57,600.00 -2,073.39 Completed l'actualisation du PCD de la 15 02 06 19 06 18 21 23 01 19 05 process Selection cmne de Kolofata, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 58563-CS-CQS / Sélection de deux consultants (OAL) Consultant Component A: Local 2017-04- 2017-03- 2017-04- 2017-06- 2017-04- 2017-07- 2017-05- 2017-08- 2017-09- 2017-11- pour la collecte et la saisie IDA / 57180 Post Qualification Open - National 85,727.00 546,754.14 Signed development support 05 30 26 09 19 09 27 13 27 11 des données du score cadre Selection deans 21 cmnes , Région de l'Extrême-Nord CM-CRC EXTREME NORD- 111119-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2020-09- 2019-06- 2019-08- 2019-09- 2019-10- 2020-08- d'un OAL pour IDA / D2990 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 14 22 05 04 09 04 l'actualisation légère du PCD process Selection de la commune de KAI KAI CM-CRC EXTREME NORD- 111118-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2021-05- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 29 04 14 09 31 l'actualisation légère du PCD process Selection de la commune de YAGOUA CM-CRC EXTREME NORD- 111218-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2019-12- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process Selection de la commune de TOKOMBERE CM-CRC EXTREME NORD- 111121-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process Selection de la commune de NDOUKOULA CM-CRC EXTREME NORD- 111120-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process Selection de la commune de MOUTOURWA CM-CRC EXTREME NORD- 111122-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process Selection de la commune de MOGODE CM-CRC EXTREME NORD- 111231-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process Selection de la commune de MAKARY CM-CRC EXTREME NORD- 111232-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2019-11- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 29 04 14 09 08 l'actualisation légère du PCD process Selection de la commune de LOGONE BIRNI CM-CRC EXTREME NORD- 111123-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2020-07- 2019-09- 2020-05- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 14 04 26 09 04 l'actualisation légère du PCD process Selection de la commune de KAELE CM-CRC EXTREME NORD- 111124-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2019-07- 2019-06- 2019-08- 2020-07- 2019-09- 2020-05- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 25 22 05 15 04 26 09 04 l'actualisation légère du PCD process Selection de la commune de BOGO CM-CRC EXTREME NORD- 111230-CS-CQS / Sélection Component B: Support to Consultant 2019-06- 2020-09- 2019-06- 2019-08- 2019-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization Post Qualification Open - National 13,000.00 0.00 Canceled 01 14 22 05 04 09 04 l'actualisation légère du PCD process Selection de la commune de MOKOLO CM-CRC EXTREME NORD- 222975-CS-CQS / Sélection d'un consultant (OSC) pour la collecte et la saisie des Component B: Support to Consultant Pending 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- données du score cadre IDA / 62240 the decentralization Post Qualification Open - National 36,400.00 0.00 Implementation 08 29 12 12 16 12 dans 7 communes (darak process Selection hile alifa, blangoua, Fotokol, kousseri zina et waza) , Région de l'Extrême-Nord ( B201103) CM-CRC EXTREME NORD- 222973-CS-CQS / Sélection d'un consultant (OSC) pour la collecte et la saisie des Component B: Support to Consultant Pending 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- données du score cadre IDA / 62240 the decentralization Post Qualification Open - National 36,400.00 0.00 Implementation 08 29 12 12 16 12 deans 7 communes (mora, process Selection kolofata, meri, maroua 1, Bourha, Koza et mokolo) , Région de l'Extrême-Nord ( B201103) CM-CRC EXTREME NORD- 222960-CS-CQS / Sélection d'un consultant (OSC) pour la collecte et la saisie des Component B: Support to Consultant Pending 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- données du score cadre IDA / 62240 the decentralization Post Qualification Open - National 31,200.00 0.00 Implementation 08 29 12 12 16 12 deans 6 communes (bogo, process Selection pette, maroua 3, TOULOUM,Mindif , GUIDIGUIS°, Région de l'Extrême-Nord ( B201103) CM-CRC EXTREME NORD- 222968-CS-CQS / Sélection d'un consultant (OSC) pour la collecte et la saisie des Component B: Support to Consultant Pending 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- données du score cadre IDA / 62240 the decentralization Post Qualification Open - National 31,200.00 0.00 Implementation 08 29 12 12 16 12 deans 6 communes (Krhay, process Selection Kalfou, guere, wina datcheka et kaikai), Région de l'Extrême-Nord ( B201103) INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated Contract / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract No. Approach Amount (US$) Status Contract Completion (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-CRC EXTREME NORD- 8103-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-06- 2017-05- 2017-12- 2017-06- IDA / 57180 Post Consultant Limited 3,000.00 3,805.88 Signed environnementales de development support 06 08 11 12 01 16 06 28 20 Selection Construction d'un bloc saitaire et d'un bloc de latrines au CSI de Djiddeo garre, commune de Maroua III CM-CRC EXTREME NORD- 8107-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-06- 2017-05- 2017-06- 2017-06- 2018-01- environnementales de IDA / 57180 Post Consultant Limited 2,600.00 1,522.35 Completed development support 06 08 11 13 01 16 06 19 20 25 Construction de 2 forages Selection équipés de PMH, un à Dolddosewo et un Ngouroré et la construction d'un bief à Kossewa, commune Maroua II CM-CRC EXTREME NORD- 8110-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2017-06- environnementales de IDA / 57180 Post Consultant Limited 3,000.00 0.00 Canceled development support 06 11 01 06 20 Construction d'un bloc Selection sanitaire et d'un bloc de latrines au centre de santé de Rhumzou, dans la commune de Mogodé CM-CRC EXTREME NORD- 8112-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual environnementales des MP Component A: Local 2017-03- 2017-05- 2017-03- 2017-09- 2017-04- 2017-09- 2017-05- 2017-10- 2017-06- 2017-10- IDA / 57180 Post Consultant Limited 2,400.00 2,093.23 Completed de Construction d'un bloc development support 06 08 11 05 01 12 06 20 20 23 Selection de deux salles de classe équipées d'un bloc latrines a trois compartiements à l'EP de Sedek Ourogabdo et au CES de BOGO CM-CRC EXTREME NORD- 8114-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité MP de Individual Component A: Local 2017-03- 2017-05- 2017-03- 2017-09- 2017-04- 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- Construction d 6 forage IDA / 57180 Post Consultant Limited 5,600.00 3,615.59 Completed development support 06 08 11 05 01 12 06 20 20 23 équipé de pompe à Selection motricité humaine et e deux (02) forages équipé de pompe à motricité humaine et rehabilitation de deux forages exista commune de BOGO CM-CRC EXTREME NORD- 8118-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction et Individual équipement d'01 bloc de 02 Component A: Local 2017-03- 2017-04- 2017-03- 2017-04- 2017-04- 2017-10- 2017-05- 2017-11- 2017-08- IDA / 57180 Post Consultant Limited 6,186.00 3,107.61 Signed salles de classe et d'un bloc development support 06 03 11 07 01 11 06 01 04 Selection de latrines à trois compartiments à l'EP Dogba, Gayack dans Construction d1 hangar et d'un bloc de latrines A PAPATA CM-CRC EXTREME NORD- 8122-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction d'un Individual Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-10- 2017-05- 2017-10- 2017-08- magasin de stockage à Kéné- IDA / 57180 Post Consultant Limited 3,304.00 2,572.86 Signed development support 06 10 11 08 01 26 06 30 04 Kéné, Construction d'un Selection bloc de 02 salles de classe équipées à l'EP de Djafgué, et Construction d'un bloc de latrines à l'EP de Djafgué cne Page 6 CM-CRC EXTREME NORD- 8126-CS-INDV / sélection d'un consultant pour le sui/contrôle des travaux de Individual réalisation de 6 forages Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2017-08- IDA / 57180 Post Consultant Limited 3,840.00 0.00 Canceled équipés de PMH à Tchékéhi, development support 06 11 01 06 04 Selection Mbokouré, Magaldao Toupéo, Soukkoungo Galdima, Bourango et Bandalaré dans la commune de Pétté CM-CRC EXTREME NORD- 8130-CS-INDV / sélection d'un consultant pour le suivi/controle des travaux Individual de Construction d'un forage Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-11- 2017-05- 2017-11- 2017-08- IDA / 57180 Post Consultant Limited 3,200.00 3,047.82 Signed pastoral à énergie solaire development support 06 10 11 08 01 08 06 20 04 Selection Balaza Lawane (Tchalloudi mango) 1 forage pastoral à énergie solaire à Kongola Saïd, commune de Maroua 3 CM-CRC EXTREME NORD- 8154-CS-INDV / sélection d'un consultant pour le suivi/controle des travaux de Construction d'un bloc Individual Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2017-08- de 02 salles de classe IDA / 57180 Post Consultant Limited 5,544.00 0.00 Canceled development support 06 11 01 06 04 équipées et d'un bloc de Selection latrines à trois compartiments à l'EP de Mayel Béi, à l'EP de Bao Hosséré II et à l'EP de Palaoudi, commune Maroua 1 CM-CRC EXTREME NORD- 8157-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Individual de construction d'un bloc Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2017-08- IDA / 57180 Post Consultant Limited 2,292.00 0.00 Canceled maternel à l'école Maternelle development support 06 11 01 06 04 Selection de Zokok-Laddo et branchement au réseau d'alimentation en eau potable, commune de Maroua 1 CM-CRC EXTREME NORD- 8159-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Individual Component A: Local 2017-03- 2017-04- 2017-03- 2017-06- 2017-04- 2017-06- 2017-05- 2017-06- 2017-08- 2018-02- de Construction de trois IDA / 57180 Post Consultant Limited 1,840.00 1,591.10 Completed development support 06 10 11 13 01 30 06 30 04 20 forages équipés de pompe à Selection motricité humaine à Ouro Dow, Goni Bello et Yoldéo Guiziga, Commune Maroua 1 CM-CRC EXTREME NORD- 8161-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Individual de Construction d'un bloc Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-06- 2017-05- 2017-06- 2017-08- IDA / 57180 Post Consultant Limited 3,690.00 3,041.89 Signed de 02 salles de classe development support 06 10 11 08 01 30 06 30 04 Selection équipées et d'un bloc de latrines à trois compartiments à l'EP Masfaï et au CES de Boula, commune de Mokolo CM-CRC EXTREME NORD- 8163-CS-INDV / sélection d'un consultant pour le Individual suivi/contrôle des travaux Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-06- 2017-05- 2017-09- 2017-08- IDA / 57180 Post Consultant Limited 1,350.00 1,113.47 Signed de Construction de 2 development support 06 10 11 08 01 06 06 14 04 Selection forages équipés de PMH un à Ouro Kessoum et à Mounam, commune de Mokolo CM-CRC EXTREME NORD- 8165-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Individual Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-12- 2017-05- 2018-01- 2017-08- 2018-04- de construction d'un IDA / 57180 Post Consultant Limited 3,510.00 3,246.38 Completed development support 06 10 11 08 01 28 06 31 04 24 ouvrage de franchissement Selection et d'assainissement sur le mayo-kwayaga, dans la commune de Mogodé CM-CRC EXTREME NORD- 8166-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Individual de Construction d'un bloc Component A: Local 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-06- 2017-05- 2017-06- 2017-08- 2017-09- IDA / 57180 Post Consultant Limited 3,618.00 2,776.20 Completed de 02 salles de classe development support 06 31 11 07 01 14 06 21 04 27 Selection équipées et d'un bloc de latrines à trois compartiments à l'EP de Saoudjo et au CES de Madaka, commune de Bogo CM-CRC EXTREME NORD- 8246-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux de Construction d'un forage Individual Component A: Local 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-06- 2017-05- 2017-06- 2017-08- 2017-08- équipé de PMH à Dambaye IDA / 57180 Post Consultant Limited 4,913.00 1,125.49 Completed development support 06 31 11 07 01 14 06 21 04 16 et à Bagalaf etAménagement Selection d'un bas-fond avec un forage à énergie solaire à Ouro Mésséré pour les cultures maraichères, commune de Bogo CM-CRC EXTREME NORD- 8247-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux deconstruction d'un bloc de Individual deux (02) salles de classe Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-11- 2017-05- 2017-11- 2017-09- IDA / 57180 Post Consultant Limited 7,152.00 6,461.92 Signed equipees et un (01) bloc development support 06 10 11 08 01 10 06 15 03 Selection latrine a trois (03) compartiments a l'EP de honkol, a l'EP de darsala, a l'EP de dabanga et l'equipement en me CM-CRC EXTREME NORD- 8248-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux deconstruction d'un forage Individual Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-06- 2017-05- 2017-06- 2017-09- 2017-09- équipé d'une pompe à IDA / 57180 Post Consultant Limited 3,280.00 3,398.97 Completed development support 06 10 11 08 01 02 06 10 03 29 motricité humaine à l' EP de Selection Darsala, l' EP de Dabanga, et un forage pastoral solaire au village Sahaba 1, l'EP groupe de Logone birni et à EP Ho CM-CRC EXTREME NORD- 8249-CS-INDV / sélection d'un consultant pour le Individual Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-11- 2017-05- 2018-01- 2017-09- 2018-06- suivi/contrôle des travaux IDA / 57180 Post Consultant Limited 4,584.00 3,598.46 Completed development support 06 10 11 08 01 24 06 20 03 13 de réalisation d'une mare Selection artificielle à Mogon dans la commune de Moutourwa CM-CRC EXTREME NORD- 8250-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Individual Component A: Local 2017-03- 2017-04- 2017-03- 2017-07- 2017-04- 2017-07- 2017-05- 2017-07- 2017-08- de construction d'un bloc de IDA / 57180 Post Consultant Limited 4,614.00 4,102.81 Signed development support 06 10 11 17 01 24 06 24 04 deux salles de classe et de Selection deux blocs de latrines à l'EP de Afadé et à l'EP de NGré dans la commune de Makary CM-CRC EXTREME NORD- 8251-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual de Construction de 6 Component A: Local 2017-03- 2017-04- 2017-03- 2017-09- 2017-04- 2017-09- 2017-05- 2018-01- 2017-08- IDA / 57180 Post Consultant Limited 3,840.00 3,192.11 Signed forages équipés de PMH à development support 06 10 11 18 01 25 06 11 04 Selection Tchékéhi, Mbokouré, Magaldao Toupéo, Soukkoungo Galdima, Bourango et Bandalaré dans la commune de Pétté CM-CRC EXTREME NORD- 8252-CS-INDV / Sélection de 3 consultants pour Individual l'appui du CCI dans la Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2018-05- IDA / 57180 Post Consultant Limited 27,632.00 0.00 Canceled passation des marchés, le development support 06 11 01 06 06 Selection suivi et l'exécution des projets à la CRC, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29287-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual environnementales des MP Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-07- 2018-01- 2017-09- IDA / 57180 Post Consultant Limited 8,500.00 5,328.23 Completed de Construction d'un forage development support 20 08 25 09 16 16 20 10 04 22 Selection PMH à Guivel Méri centre, à Houloum, à Tchaki Djébé, à Kilwo, à Mbozo Mofou, à Balewa, à Nguissar, au quartier Hot CM-CRC EXTREME NORD- 29288-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-07- 2018-01- 2017-09- environnementales des MP IDA / 57180 Post Consultant Limited 2,400.00 3,425.29 Completed development support 20 08 25 12 16 16 20 10 04 22 de Construction d'un bloc Selection de deux salles de classe équipées avec un bloc latrines au CES de Manguirdla et Construction d'un magasin de stockage à CM-CRC EXTREME NORD- 29289-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-11- 2017-08- 2018-01- 2017-10- environnementales des MP IDA / 57180 Post Consultant Limited 2,000.00 2,367.54 Completed development support 20 08 25 19 16 20 01 04 04 de Construction 01 bloc de Selection deux salles de classe équipées avec un bloc latrines à l'EP de Djagalaï et au CES de Hardé dans la commune de MRA IER CM-CRC EXTREME NORD- 29291-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-06- 2018-01- 2017-10- environnementales des MP IDA / 57180 Post Consultant Limited 1,600.00 1,694.12 Completed development support 20 08 25 13 16 16 20 19 04 04 de Construction d'un forage Selection équipé de pompe à motricité humaine à Nyamdjidim et à Zébé dans la commune de Maroua I (2 FORAGES PMH) CM-CRC EXTREME NORD- 29292-CS-INDV / Sélection d'un consultant pour les Etudes des des MP de Construction d'un bloc de Individual Component A: Local 2017-09- 2017-05- 2017-11- 2017-06- 2017-11- 2017-06- 2018-01- 2017-07- 2018-02- 2017-09- 02 salles de classe équipées IDA / 57180 Post Consultant Open 3,750.00 4,231.37 Completed development support 21 08 09 12 30 16 04 04 18 21 avec 01 bloc de latrines à Selection l'EP de Ndrock Tourou, à EP Zili Yolel, à EP Moufou Sud, EP de Ldamang et au CES Mandaka commune mokolo CM-CRC EXTREME NORD- 29293-CS-INDV / Sélection d'1 consultant pour Individual Component A: Local 2017-09- 2017-05- 2017-11- 2017-06- 2017-11- 2017-09- 2018-01- 2017-09- 2018-02- 2017-09- l'élaboration des Etudes des IDA / 57180 Post Consultant Open 5,000.00 3,001.30 Completed development support 21 08 09 12 30 08 04 14 18 21 MP de Construction de 08 Selection forage PMH dans la commune de mokolo CM-CRC EXTREME NORD- 29295-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-12- 2018-01- 2018-01- environnementales MP IDA / 57180 Post Consultant Limited 1,600.00 2,664.12 Completed development support 20 08 25 12 16 16 20 20 04 10 Construction d'1 bloc de Selection deux salles de classe équipées et 1 bloc de latrine à l'EP de Pitoa Kolara et à l'EP de Badadji dans la cne de moulvoudaye CM-CRC EXTREME NORD- 29297-CS-INDV / Sélection d'un consultant pour Etudes de faisabilité des MP de Construction d'un forage Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-05- 2017-10- 2017-06- 2017-11- 2017-08- 2018-01- 2017-09- PMH à Hourgoum, IDA / 57180 Post Consultant Limited 3,000.00 2,568.97 Completed development support 20 08 25 13 16 18 20 28 04 28 Goumlaye, Kadaye Selection Djamboutou, à Gadja Padjonré et au Lycée de Kolara , EP piotao kaloara et Ep bardadji dans la commune de Moulvoudaye CM-CRC EXTREME NORD- 29299-CS-INDV / Sélection d'un consultant pour Etudes d des MP de Construction d'1 bloc de Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-07- 2018-01- 2017-09- deux salles de classe et d'1 IDA / 57180 Post Consultant Limited 4,000.00 5,113.88 Completed development support 20 08 25 12 16 16 20 10 04 22 bloc de latrine à l'EP Selection MOUFTOUM , au CES GOURIA, Lycée de SIR, à l'EPB de RHUMZOU , à l'EPB de KWASHIMANDA et équipement tables banc cne de MOZOGO CM-CRC EXTREME NORD- 29300-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-09- 2018-01- 2017-09- environnementales des MP IDA / 57180 Post Consultant Limited 2,000.00 2,534.91 Completed development support 20 08 25 12 16 16 20 07 04 22 de Construction d'un Selection ouvrage d'assainissement et de franchissement sur le Mayo Teki à TEKI commune de MOGODE CM-CRC EXTREME NORD- 29301-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Sélection d'un consultant Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-07- 2018-01- 2017-09- pour l'élaboration des IDA / 57180 Post Consultant Limited 4,950.00 3,805.88 Completed development support 20 08 25 06 16 16 20 10 04 22 Etudes de faisabilité Selection techniques et environnementales des MP de Construction d'un forage équipé à PMH (8 Forages) da commune de MOGODE CM-CRC EXTREME NORD- 29302-CS-INDV / Sélection d'un consultant pour Elaboration étude des MP de Construction d'1 bloc de Individual Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-06- 2018-01- 2017-09- deux salles de classe IDA / 57180 Post Consultant Limited 4,000.00 4,894.14 Completed development support 20 08 25 12 16 16 20 16 04 22 équipées et d'1 bloc de Selection latrines à l'EP Souaye Dana, à l'EP Domo Doukou, à l'EP de Riganda, à l'EP Kao-Galak et à l'EP Bilingue Vounsia CNE YAGOUA CM-CRC EXTREME NORD- 29303-CS-INDV / Sélection d'un consultant pourétude des MP de Construction d'un Individual forage equipe de PMH à l'EP Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-06- 2018-01- 2017-09- IDA / 57180 Post Consultant Limited 3,000.00 4,869.96 Completed Souaye Dana, à l'EP Domo development support 20 08 25 12 16 16 20 18 04 22 Selection Doukou, à l'EP de Riganda, à l'EP Kao-Galak et à l'EP Bi Vounsia dans la commune de Yagoua CM-CRC EXTREME NORD- 38284-CS-INDV / ÉTUDES DE FAISABILITÉ DES MP DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE Individual ÉQUIPÉES À L'EP KOZA I, À Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 Post Consultant Limited 6,600.00 2,458.96 Completed L'EP KOZA II, À L'EP development support 26 11 01 02 22 06 26 16 12 04 Selection DAKOTCHERE, À L'EP DE KILDA ET À L'EP DE GABOUA, CONSTRUCTION D'UN BLOC LATRINES A L'EP DE GABOUA, DANS LA COMMUNE DE KOZA CM-CRC EXTREME NORD- 38285-CS-INDV / ETUDES de faisabilité des MP de Individual Construction d'un forage Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 Post Consultant Limited 1,000.00 1,134.91 Completed équipé de pompe à development support 27 11 02 02 23 06 27 16 13 04 Selection motricité humaine a l'EP de KILDA dans la commune de KOZA dans la commune de KOZA CM-CRC EXTREME NORD- 38286-CS-INDV / ETUDES de faisabilité des MP d'équipement en tables Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- banc et bureaux ( 60 tables IDA / 57180 Post Consultant Limited 1,800.00 756.60 Completed development support 27 11 02 02 23 06 27 16 13 04 banc + 02 bureaux et 02 Selection Chaises) a l'EP de KOZA I , l'EP de KOZA II, a l'EP de GABOUA, dans la commune de KOZA CM-CRC EXTREME NORD- 38287-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de deux salles de classe Individual équipées et d'un bloc de Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 6,000.00 2,601.01 Completed latrines à trois development support 27 11 02 02 23 06 27 16 13 06 Selection compartiments au CES MAZAYA, à l'EPB de MIDRE, l'EP ZELE SOULEDE, l'EP BAO DALBAI et l'EP DOUMDERE dans la commune de ROUA dans la Page 7 CM-CRC EXTREME NORD- 38288-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-12- 2018-03- 2018-03- équipé de pompe à IDA / 57180 Post Consultant Limited 4,000.00 2,811.29 Completed development support 26 11 01 02 22 06 26 20 12 06 motricité humaine à l'EP Selection ZELE SOULEDE, à l'EP BAO DALBAI, au CES MAZAYA et à l'EP DOUMDERE dans la commune de ROUA CM-CRC EXTREME NORD- 38289-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- équipé de pompe à IDA / 57180 Post Consultant Limited 3,000.00 2,054.80 Signed development support 27 14 02 14 23 06 27 06 13 motricité humaine au CETIC Selection D'OUZAL, l'EP GOKORO et l'EM de MOSKOTA dans la commune MOZOGO CM-CRC EXTREME NORD- 38290-CS-INDV / ETUDES des MP de Construction de deux salles de classe équipées et d'1 bloc latrines Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2018-10- 2018-03- au CETIC D'OUZAL, l'EP IDA / 57180 Post Consultant Limited 9,600.00 10,413.78 Signed development support 27 14 02 14 23 06 27 09 13 NGUETCHEWE ,de deux Selection salles de classe équipées à l'EPB MOZOGO, L'EP KORASAMBA, l'EP KARAZAWA l'EP GOKORO et d1 atelier à la SAR/SM et CETIC MOZOGO CM-CRC EXTREME NORD- 38291-CS-INDV / ETUDES de faisabilité des MP de Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- Construction d'un hangar de IDA / 57180 Post Consultant Limited 2,400.00 2,680.17 Signed development support 27 14 02 14 23 06 27 09 13 marché au marché de Selection MAWA MOZOGO et au marche de MOSKOTA CM-CRC EXTREME NORD- 38292-CS-INDV / ETUDES de faisabilité des MP de Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- Construction d'un bloc IDA / 57180 Post Consultant Limited 2,400.00 2,405.98 Signed development support 27 14 02 14 23 06 27 09 13 maternelle équipée à L'EM Selection DE MOSKOTA et d'une cloture a l'EM de MOZOGO CM-CRC EXTREME NORD- 38293-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2018-12- équipé de pompe à IDA / 57180 Post Consultant Limited 4,000.00 1,903.46 Completed development support 27 11 02 02 23 06 27 16 13 20 motricité humaine à Ildin- Selection toungouloun, Wouro Wandou Moufou, Narewa Et Makoumba dans la commune de GAZAWA CM-CRC EXTREME NORD- 38294-CS-INDV / ETUDES de faisabilité des MP de Construction de deux salles de classe équipées et d'un Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- bloc de latrines à l'EP de IDA / 57180 Post Consultant Limited 3,600.00 2,577.87 Completed development support 27 11 02 02 23 06 27 16 13 23 wouyang, à l'EP de GONOZO Selection et construction d'un atelier de maçonnerie et d'un bloc latrine au CETIC de Loulou A NDOUKOULA CM-CRC EXTREME NORD- 38295-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Individual équipé de pompe PMH à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 Post Consultant Limited 5,600.00 2,575.26 Completed l'EP de Ouro-Nangué, à l'EP development support 27 11 02 02 23 06 27 16 13 23 Selection MOUDVAR, à l'EP de Gonozo, à Fakalao, à EP Louguéré, à Talandé et à Hodango CMNE NDOUKOULA CM-CRC EXTREME NORD- 38296-CS-INDV / ETUDES de faisabilité des MP d' Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2018-11- Extension du réseau IDA / 57180 Post Consultant Limited 6,000.00 4,722.68 Completed development support 27 11 02 02 23 06 27 16 13 17 électrique Loulou- Selection Ndoukoula-Dagaï (22km) COMMUNE NDOUKOULA CM-CRC EXTREME NORD- 38297-CS-INDV / ETUDES de faisabilité des MP de Construction de deux salles de classe équipées et Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- d'un bloc de latrines à l'EP IDA / 57180 Post Consultant Limited 5,400.00 2,161.74 Completed development support 27 11 02 02 23 06 27 16 13 13 de Bihoré, à l'EP de Troké, à Selection l'EP de Goua et à l'EP de Youaye Mbogue et équipement des salles de classe au lycée de TCHATIBALI CM-CRC EXTREME NORD- 38298-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Individual équipé de pompe à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 Post Consultant Limited 4,500.00 2,368.41 Completed motricité Humaine à Gané development support 27 11 02 02 23 06 27 16 13 13 Selection (quartier bili), à L'EP de Saouringwa, à Danglao(quartier Bidomo), Kada'a Glonhene, Bindiriel Danghou commune Tchatibali CM-CRC EXTREME NORD- 38299-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de deux salles de classe Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- équipées et d'un bloc de IDA / 57180 Post Consultant Limited 6,000.00 2,593.97 Completed development support 27 11 02 02 23 06 27 11 13 06 latrines à trois Selection compartiments l'EP de Balané, au CES de Sirlawé, l'EP de Rey-foulaye, l'EP de Datchéka-takréo,l'EP de Sadielle COMMUNE DE KARHAY. CM-CRC EXTREME NORD- 38300-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage équipé de pompe à Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- motricité Humaine à l'EP de IDA / 57180 Post Consultant Limited 5,600.00 2,577.87 Completed development support 27 11 02 02 23 06 27 16 13 06 Balané, à l'école des parents Selection de Gouloulou, à l'EP de Rey- foulaye, à l'EP de Sadielle, à l'EP de Damdama, au CES de Sirlawé, au CSI de Doukoula 1 CM-CRC EXTREME NORD- 38301-CS-INDV / ETUDES de faisabilité des MP de Construction d'un Centre de Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- Santé intégré équipé, un IDA / 57180 Post Consultant Limited 2,800.00 2,828.45 Completed development support 27 11 02 28 23 06 27 16 13 06 incinérateur, et un bloc de Selection latrines au Centre de Santé Intégré de Doukoula 1 commune KARHAY CM-CRC EXTREME NORD- 38302-CS-INDV / ETUDES de faisabilité des MP de Construction de deux salles de classe équipées et d'un  Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- bloc latrines au Lycée tech IDA / 57180 Post Consultant Limited 6,000.00 3,045.09 Signed development support 27 11 02 02 23 06 27 09 13 de Gobo, l' EP GUIRIOU Selection CENTRE, Lycée de DOM PYA, la SAR/ SM Gobo, et la construction d'un bloc latrines au marché de GOBO et de NOULD CM-CRC EXTREME NORD- 38303-CS-INDV / ETUDES de faisabilité des MP de construction d'un forage pastoral équipé de pompe à Individual énergie photovoltaïque à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- IDA / 57180 Post Consultant Limited 4,000.00 3,026.19 Signed GALAM BASSA et la development support 27 11 02 02 23 06 27 09 13 Selection construction d'un forage équipé de PMH au CES de POLGUE, à l'EP GUIRIOU CENTRE et à la SAR/ SM de Gobo CM-CRC EXTREME NORD- 38304-CS-INDV / ETUDES de faisabilité des MP de Construction d'un  bloc de deux salles de classe Individual équipées et construction Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 Post Consultant Limited 4,800.00 2,819.53 Completed d'un  bloc latrine à trois development support 27 11 02 02 23 06 27 09 13 14 Selection compartiment au CES de Doukroye, au CETIC de Doreissou, à l'EP de Dama - Djougong et à l'EP de DJOWELNANDJI communeKAIKAI CM-CRC EXTREME NORD- 38305-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage équipé de PMH au CETIC de Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- Doressou, a l'EP de Daram - IDA / 57180 Post Consultant Limited 5,400.00 2,819.53 Completed development support 27 11 02 02 23 06 27 09 13 14 Djougong, à l' EP de Daloa Selection (Doukroye), au Lycée de Bégué Palam, au Lycée de Daram-Doreissou centre, à l'EP de Memié COMMUNE DE KAI-KAI CM-CRC EXTREME NORD- 38306-CS-INDV / ETUDES de faisabilité des MP de Construction d'un  bloc de deux salles de classe Individual équipées et de construction Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-11- IDA / 57180 Post Consultant Limited 8,000.00 4,728.78 Completed d'un  bloc de latrines à trois development support 27 11 02 02 23 06 27 16 13 30 Selection compartiments à l'EP de Doumrou, à l'EP Mizao, à l'EP de Bipaing, a l' EP de Goudjouing, au lycée de Mindjil, à E CM-CRC EXTREME NORD- 38307-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage équipé de PMH à Bibalé - Individual Gambour, à Goubara, à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-11- IDA / 57180 Post Consultant Limited 5,400.00 4,699.43 Completed Kourong, à Kassilé. Et development support 27 11 02 02 23 06 27 16 13 30 Selection l'actualisationdes microprojets de réhabilitation de la mare de Garey Kaélé et la construction d'un forage pastoral à énergie so CM-CRC EXTREME NORD- 38308-CS-INDV / ETUDES de faisabilité des MP de Construction d'un  bloc de deux salles de classe Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- équipées à EP Dourdoum, IDA / 57180 Post Consultant Limited 3,000.00 2,689.95 Completed development support 27 11 02 02 23 06 27 18 13 15 à EP Kalaf, à EP Mayel - Selection Guinadji et Construction d'un  bloc latrine à trois compartiment à EP Mayel - Guinadji COMMUNE DE Moutourwa CM-CRC EXTREME NORD- 38309-CS-INDV / ETUDES de faisabilité du MP de Individual Construction d'un forage Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 Post Consultant Limited 1,000.00 2,086.45 Completed équipé de PMH À development support 27 11 02 02 23 06 27 17 13 15 Selection GANAHA,EP DOURDOUM, À EP KALAF, À EP MAYEL - GUINADJI COMMUNE DE Moutourwa CM-CRC EXTREME NORD- 38310-CS-INDV / ETUDES de faisabilité du MP Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- d'électrification en énergie IDA / 57180 Post Consultant Limited 3,600.00 1,879.77 Signed development support 27 11 02 02 23 06 27 16 13 solaire de la localité de Selection Magada carrefour COMMUNE DE Moutourwa CM-CRC EXTREME NORD- 38311-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de deux salles de classe Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-12- 2018-03- 2017-12- équipées à l'EP de IDA / 57180 Post Consultant Limited 6,000.00 4,905.06 Completed development support 27 14 02 14 23 25 27 05 13 09 Gouvaka, à l'EP de Majé, à Selection l'EP de Malika et construction de 01 magasin de stockage à Oignon à Sera -Idoumda et à Kourgui COMMUNE DE MORA CM-CRC EXTREME NORD- 38312-CS-INDV / ETUDES de faisabilité des MP de Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-12- 2018-01- 2017-12- 2018-03- 2017-12- Construction d'un forage IDA / 57180 Post Consultant Limited 2,000.00 2,633.18 Completed development support 27 14 02 14 23 05 27 05 13 09 équipé de pompe à Selection motricité Humaine à Koulang, à Mangavé COMMUNE DE MORA CM-CRC EXTREME NORD- 38313-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- équipé de pompe à IDA / 57180 Post Consultant Limited 3,000.00 1,962.54 Completed development support 27 14 02 28 23 06 27 16 13 19 motricité humaine dans les Selection localités de WOLORDE- TCABAWOL, BAKA FOURWA ET DJALTAR dans la commune de TOKOMBERE CM-CRC EXTREME NORD- 38314-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- deux salles de classe IDA / 57180 Post Consultant Limited 3,200.00 2,689.95 Completed development support 27 11 02 02 23 06 27 06 13 19 équipées à l'EP DE Selection TSABATSABA,L'EP CHEOULEW, l'EP TAZANG ET AU CES DE MAKALINGAI dans la commune de TOKOMBERE CM-CRC EXTREME NORD- 38315-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de deux salles de classe Individual Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- équipées à l'EP DE GANCE, IDA / 57180 Post Consultant Limited 3,000.00 3,961.78 Completed development support 27 14 02 14 23 25 27 25 13 14 AU CES DE TOLKOMARI et Selection Construction d'un bloc de latrines a trois compartiments au CES de TOLKOMARI, commune de KOLOFATA CM-CRC EXTREME NORD- 38316-CS-INDV / ETUDES de faisabilité du MP de Construction d'un forage pastoral équipé de pompe à Individual énergie solaire avec Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 Post Consultant Limited 2,800.00 3,961.78 Completed réservoir et abreuvoirs à development support 27 14 02 14 23 25 27 25 13 14 Selection Kolofata-Guidi et Construction d'un forage équipé de pompe à motricité humaine au CES de TOLKOMARI dans la commune de KOLO CM-CRC EXTREME NORD- 38317-CS-INDV / ETUDES DE FAISABILITE DU MP CONSTRUCTION D'UN BLOC Individual DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 1,650.00 1,505.22 Completed EQUIPE ET D'UN BLOC DE development support 27 06 02 06 23 17 27 20 13 22 Selection LATRINES A TROIS COMPARTIMENTS A L'EP KOUTOULA COMMUNE DE BLANGOUA CM-CRC EXTREME NORD- 38318-CS-INDV / ETUDES Individual DE FAISABILITE DU MP Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 2,700.00 2,409.68 Completed CONSTRUCTION D'UNE development support 27 06 02 06 23 17 27 20 13 22 Selection GARE ROUTIERE AVEC BLOC LATRINES A BLANGOUA CM-CRC EXTREME NORD- 38319-CS-INDV / ELABORATION DES ETUDES Individual DE FAISABILITE DU MP DE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 2,000.00 1,880.84 Completed CONSTRUCTION D'UN development support 27 06 02 06 23 17 27 17 13 25 Selection FORAGE EQUIPE DE PMH A ABINKRO ET A KOUTALA DANS LA COMMUNE DE BLANGOUA CM-CRC EXTREME NORD- 38320-CS-INDV / ETUDES DE FAISABILITE DU MP D Individual CONSTRUCTION D'UN Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 2,700.00 2,539.13 Completed FORAGE PASTORAL A development support 27 06 02 06 23 17 27 17 13 21 Selection ENERGIE SOLAIRE A MAGALAKABIR, A KARENA ET A NAGA COMMUNE DE DARAK CM-CRC EXTREME NORD- 38321-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN BLOC Individual DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 1,650.00 1,472.58 Completed EQUIPE ET D'UN BLOC DE development support 27 06 02 06 23 17 27 20 13 23 Selection LATRINES A TROIS COMPARTIMENTS A L'EP HILELLE COMMUNE DE GOULFEY Page 8 CM-CRC EXTREME NORD- 38322-CS-INDV / ETUDES DE FAISABILITE DU MP DE Individual Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- CONSTRUCTION D'UN IDA / 57180 Post Consultant Limited 1,170.00 1,099.00 Completed development support 27 06 02 06 23 17 27 20 13 23 HANGAR AU MARCHE DE Selection GOULFEY GANA COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 38323-CS-INDV / ETUDES DE FAISABILITE DU MP DE Individual Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- CONSTRUCTION D'UN IDA / 57180 Post Consultant Limited 1,140.00 1,017.42 Completed development support 27 06 02 06 23 17 27 20 13 23 MAGASIN DE STOCKAGE A Selection GOULFEY COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 38324-CS-INDV / ETUDES DE FAISABILITE DU MP DE Individual Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- CONSTRUCTION D'UNE IDA / 57180 Post Consultant Limited 2,700.00 2,409.68 Completed development support 27 06 02 14 23 17 27 20 13 23 GARE ROUTIERE AVEC BLOC Selection LATRINES A GOULFEY COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 38325-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN FORAGE PASTORAL A Individual ENERGIE SOLAIRE A Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 4,000.00 3,761.68 Completed DJAGALAT, A AKMASSIRAK development support 27 06 02 06 23 17 27 17 13 23 Selection ET DE LA CONSTRUCTION D'UN FORAGE EQUIPES DEPMH A MOUGALAM, A LA GARE ROUTIERE DE GOULFEY, A TAWOULWEBE ET A L'EP HILELE COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 38326-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN CENTRE DE SANTE INTEGRE Individual Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- EQUIPE, AVEC BLOC DE IDA / 57180 Post Consultant Limited 4,500.00 4,016.14 Completed development support 27 06 02 14 23 17 27 20 13 23 LATRINES ET UN Selection INCINERATEUR A HILE HAOUSSA COMMUNE DE HILE ALIFA " CM-CRC EXTREME NORD- 38327-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN BLOC Individual DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 1,650.00 1,472.58 Completed EQUIPE ET D'UN BLOC DE development support 27 06 02 14 23 17 27 20 13 23 Selection LATRINES A TROIS COMPARTIMENTS AU CES D'ADJAÏNE COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38328-CS-INDV / TUDE DES MICROPROJETS DE CONSTRUCTION D'UN FORAGE PASTORAL A Individual ENERGIE SOLAIRE A LACTA Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 2,800.00 2,633.18 Completed 1, MASSAKI ET development support 27 06 02 06 23 17 27 17 13 23 Selection CONSTRUCTION D'UN FORGAE EQUIPE DE POMPE A MOTRICITE HUMAINE AU CES D'ADJAINE ET AU CSI DE HILE HAOUSSA COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38329-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION DE QUATRE FORAGES EQUIPES DE POMPE Individual Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- A MOTRICITE HUMAINE AU IDA / 57180 Post Consultant Limited 2,800.00 2,554.31 Completed development support 27 06 02 06 23 17 27 17 13 22 MARCHE A BETAIL DE Selection MADA, A MASSIO- GOURGOURA, A NAGA NDIGUINI, A EP MALTAM COMMMUNE DE MAKARY CM-CRC EXTREME NORD- 38330-CS-INDV / ETUDES DE FAISABILITE DU MP DE Individual CONSTRUCTION D'UNE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 1,500.00 1,338.71 Completed CLOTURE ET D'UN BLOC DE development support 27 06 02 14 23 17 27 20 13 22 Selection LATRINES AU MARCHE A BETAIL DE MADA COMMMUNE DE MAKARY CM-CRC EXTREME NORD- 38331-CS-INDV / ETUDES DE FAISABILITE DU MP DE Individual Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- CONSTRUCTION D'UN IDA / 57180 Post Consultant Limited 1,170.00 1,044.20 Completed development support 27 06 02 06 23 17 27 20 13 22 HANGAR AVEC BLOC Selection LATRINE AU MARCHE DE BIAMO, COMMMUNE DE MAKARY CM-CRC EXTREME NORD- 38332-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN BLOC Individual DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 1,650.00 1,505.22 Completed EQUIPE ET D'UN BLOC DE development support 27 06 02 06 23 17 27 20 13 23 Selection LATRINES A TROIS COMPARTIMENTS A L'EP DE MALTAM COMMMUNE DE MAKARY CM-CRC EXTREME NORD- 38333-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN BLOC Individual DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 1,650.00 1,472.58 Completed EQUIPE ET D'UN BLOC DE development support 27 06 02 14 23 17 27 20 13 25 Selection LATRINES A TROIS COMPARTIMENTS A L'EP GONONI COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38334-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN FORAGE PASTORAL A Individual ENERGIE SOLAIRE A Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 5,700.00 5,360.39 Completed ABASSOUNI, A HILE ALIFA 1, development support 27 06 02 06 23 17 27 17 13 25 Selection A FADJA, A DOLE BADA ET CONSTRUCTION D'UN FORAGE EQUIPE DE PMH A MAFOULSO III, A FAMARE ET A L'EP DE GONONI COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38335-CS-INDV / ETUDES DE FAISABILITE DES MP D'INSTALLATION Individual D'ECLAIRAGE PUBLIC (10 Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 Post Consultant Limited 1,600.00 1,504.67 Completed KITS)AVEC ENERGIE SOLAIRE development support 27 06 02 06 23 17 27 17 13 25 Selection DE L'AXE MAIRIE DE HILE ALIFA-BRIGADE DE GENDARMERIE DE HILE COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38336-CS-INDV / Suivi/contrôle de la Construction de deux salles de classe équipées avec Individual latrines à l'EP Mouftoum et Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-03- 2018-01- 2018-04- 2018-05- IDA / 57180 Post Consultant Limited 9,483.00 7,714.59 Signed à l'EPB Rhoumzou, au lycée development support 27 05 02 28 23 06 27 10 27 Selection SIR et à l'EPB Kwashimalda, Et CES Goura et Equipment au CETIC Mogodé, à l'EP SIR, à l'EPB Rhoumsiki et à l'EP Tchanawa CM-CRC EXTREME NORD- 38337-CS-INDV / Suivi/contrôle des Travaux Individual Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- construction d'un radier de IDA / 57180 Post Consultant Limited 13,819.00 1,115.61 Signed development support 27 05 02 28 23 06 27 10 27 12 ml sur le mayo Teki Selection dans la localité de Teki, Commune de Mogode CM-CRC EXTREME NORD- 38338-CS-INDV / Suivi/contrôle des Travaux de construction d'un bloc de deux salles équipées et un Individual Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- bloc de latrines à l'EP de IDA / 57180 Post Consultant Limited 9,345.00 6,782.81 Signed development support 27 05 02 07 23 06 27 10 27 Ldamang et à l'EP de Ndrock Selection Tourou, à l'EP de Moufou- sud et à l'EP de Zili Yolel et au CES de Mandaka COMMUNE DE MOKOLO CM-CRC EXTREME NORD- 38339-CS-INDV / Suivi/contrôle des Travaux Construction de 01 forage équipé dePMH à EM de Individual Ldamtsai, Mandaka Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-05- IDA / 57180 Post Consultant Limited 5,339.00 2,320.44 Signed Mpoldok, Camp mission de development support 27 05 02 28 23 06 27 10 27 Selection Tourou, Koudougour II Loctcha, Katamsa Sikia, Gouldoum Moufou, Houdango Dandi et Ouro Bocki(2lots) COMMUNE DE MOKOLO CM-CRC EXTREME NORD- 38341-CS-INDV / Suivi/contrôle des Travaux de construction d'un forage Individual Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- équipé de PMH dans les IDA / 57180 Post Consultant Limited 3,477.00 2,737.83 Signed development support 27 05 02 02 23 04 27 06 27 localités de Gadjawai, Selection Guivel, Quartier Méri centre, Nguissar et Kilwo-Valta (Lot 2) COMMUNE DE MERI CM-CRC EXTREME NORD- 38343-CS-INDV / Suivi/contrôle des Travaux Individual Construction d'un bloc de Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 Post Consultant Limited 2,047.00 1,429.35 Signed deux salles de classe development support 27 05 02 07 23 04 27 06 27 Selection équipées et un bloc de latrines au C.E.S de Manguirdla commune de MERI CM-CRC EXTREME NORD- 38344-CS-INDV / Suivi/contrôle des Travaux Individual de construction d'un bloc de Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 Post Consultant Limited 3,827.00 2,945.17 Signed deux salles de classe development support 27 05 02 07 23 05 27 10 27 Selection équipées avec latrines à l'EP de Domo Doukou et à l'EP de Riganda commune de yagoua CM-CRC EXTREME NORD- 38345-CS-INDV / Individual Suivi/contrôle des Travaux Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-03- IDA / 57180 Post Consultant Limited 623.00 526.56 Signed de construction d' un forage development support 27 05 02 07 23 05 27 10 28 Selection équipé de PMH à l'EP de Riganda de yagoua CM-CRC EXTREME NORD- 38346-CS-INDV / Suivi/contrôle des Travaux construction d'un forage Individual Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- équipé de PMH à l'EP de IDA / 57180 Post Consultant Limited 2,895.00 2,945.17 Signed development support 27 05 02 08 23 05 27 10 27 Badadji, à l'EP de Pitoa- Selection Kolara, au lycée de Kolara et à Gadjia Padjonré commune de moulvoudaye CM-CRC EXTREME NORD- 38347-CS-INDV / Suivi/contrôle des Travaux Individual construction d'un bloc de Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 Post Consultant Limited 3,973.00 2,945.17 Signed deux salles de classe development support 27 05 02 28 23 05 27 10 27 Selection équipées et un bloc de latrines à l'EP de Pitoa- Kolara et à l'EP de Badadji CM-CRC EXTREME NORD- 38348-CS-INDV / Suivi/contrôle des Travaux Individual de construction d'un bloc de Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 Post Consultant Limited 3,655.00 3,010.44 Signed deux salles équipées et un development support 27 05 02 28 23 04 27 06 27 Selection bloc de latrines à l'EP de Djagalaye et au CES de Hardé commune de Maroua I CM-CRC EXTREME NORD- 38349-CS-INDV / Suivi/contrôle des Travaux Individual construction d'un forage Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 Post Consultant Limited 1,946.00 1,350.14 Signed équipé de PMH à l'EP de development support 27 05 02 28 23 04 27 06 27 Selection Yamdjidjing, à l'EP de Djagalaye et à Zébé commune de MAROUA I CM-CRC EXTREME NORD- 38350-CS-INDV / Suivi/contrôle de Travaux de construction d'un bloc de Individual deux salles équipées et un Component A: Local 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- 2019-08- IDA / 57180 Post Consultant Limited 3,574.00 2,976.37 Completed bloc de latrines CES de development support 27 14 02 21 23 04 27 06 27 08 Selection Balda et Construction d'un bloc de deux salles de classe équipées à l'EP de Sedek Ouro-Gabdo commune de BOGO CM-CRC EXTREME NORD- 38351-CS-INDV / Suivi/contrôle de Travaux de Construction d'un forage équipé de pompe à Individual Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-05- motricité humaine à l'EP de IDA / 57180 Post Consultant Limited 3,786.00 2,477.61 Signed development support 27 05 02 28 23 04 27 12 27 Sedek Ouro Gabdo à Ardo Selection Foulbé Tankirou à Gagnéri Kourdaya à Guinlaye Guizigaré et Guinlaye Moufouré dans la commune BOGO CM-CRC EXTREME NORD- 58686-CS-INDV / Sélection d'un consultant pour etudes de faisabilité DU Individual Component A: Local 2017-11- 2017-11- 2018-01- 2017-12- 2018-02- 2018-12- 2018-03- 2018-02- 2018-04- MICROPROJET DES TRAVAUX IDA / 57180 Post Consultant Open 3,000.00 2,587.10 Signed development support 27 27 15 14 05 21 12 21 26 DE REHABILILATION DU Selection TRONCON HOTEL LE SAHEL- MAYO-KALIAO (0,7 KM) cmne DE MAROUA Ier CM-CRC EXTREME NORD- 58621-CS-INDV / Sélection d'un consultant pour etudes Individual de faisabilité des MP de Component A: Local 2017-11- 2017-11- 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-11- 2018-04- IDA / 57180 Post Consultant Open 3,000.00 2,648.73 Signed REHABILILATION DE LA development support 27 28 15 25 05 01 12 19 26 Selection PISTE SOUKOUDJO- BAGRISSE-FARARE (28 KM) dans la cmne de Pette. CM-CRC EXTREME NORD- 58856-CS-INDV / Sélection d'un consultant pour lEtudes de faisabilité des MP de Individual Construction de 01 Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-12- IDA / 57180 Post Consultant Open 2,200.00 1,902.66 Completed batiment abritant le bloc development support 27 08 15 22 05 02 09 16 24 20 Selection opératoire, la salle d'échographie au CMA avec clôture et un bloc de latrine au CMA de Gazawa dans la cmne de Gazawa. CM-CRC EXTREME NORD- 58511-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-07- construction de 01 forage à IDA / 57180 Post Consultant Open 3,000.00 2,596.59 Completed development support 27 08 15 22 05 02 09 06 24 20 PMH à Yoldé-Naggué à Selection Hodema à Tchakamadjé à Yaga -Djibiwo à Bakourehi cmne de Pette. CM-CRC EXTREME NORD- 58487-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- construction de 01 forage à IDA / 57180 Post Consultant Open 2,400.00 2,089.44 Signed development support 27 08 15 22 05 02 09 09 24 PMH au CES de Guinadji à Selection DJARELOL ALIOUM et un forage solaire au CSI de Djiddéo cmne de MAROUA III. CM-CRC EXTREME NORD- 58620-CS-INDV / Sélection d'un consultant pour etudes Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- de faisabilité des MP de IDA / 57180 Post Consultant Open 1,000.00 3,935.36 Signed development support 27 08 15 15 05 02 09 06 24 Contruction d'un bloc de 2 Selection salles de classe au CES GOBIO dans la cmne de Kalfou. CM-CRC EXTREME NORD- 58492-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de construct d'un forage à PMH Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-12- à Meskina Tifouli à Djabéwal IDA / 57180 Post Consultant Open 4,600.00 3,940.34 Completed development support 27 08 15 05 02 09 06 24 27 à Gandou Guinane au CES Selection de Zaria à Delta Guibéré et Rehabilitation d'un forage à Djada à Mandara dans la cmne de Kalfou. Page 9 CM-CRC EXTREME NORD- 58568-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- Construction de 01 forage IDA / 57180 Post Consultant Open 2,400.00 2,439.92 Completed development support 27 02 15 22 05 02 09 06 24 30 equipé de PMH au CETIC de Selection Tchévi à ZEU à ZOUVOU - YOLDE à DOUVA cmne DE BOURHA(04 MP) CM-CRC EXTREME NORD- 58678-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Rehabilitation de la route Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- Guili-ZEU, construction des IDA / 57180 Post Consultant Open 4,000.00 3,148.29 Completed development support 27 08 15 15 05 02 09 06 24 30 caniveaux à Bourha (axe Selection Hamadou -ZRA-Bello Hayatou) et Construction des caniveaux à Boukoula face commissariat cmne de Bourha. CM-CRC EXTREME NORD- 58538-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-05- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- construction d'un bloc de 02 IDA / 57180 Post Consultant Open 1,300.00 1,136.88 Completed development support 27 02 15 24 05 02 09 06 24 30 salles de classe équipées et Selection d'un bloc de latrines à trois compartiments au CETIC de Tchevi cmne de Bourha. CM-CRC EXTREME NORD- 58385-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Individual construct bloc de 02 SC Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- IDA / 57180 Post Consultant Open 4,750.00 3,128.80 Completed equipés et d'un bloc de development support 27 08 15 15 05 02 09 04 24 09 Selection latrines à EP KAOSSERE à EP LIOUDE à L'EP B de TOULOUM à L'EP TCHOURA BIZILI à EP SAOTSAI cmne de TOULOUM CM-CRC EXTREME NORD- 58328-CS-INDV / Sélection d'un consultant pour etudes Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- de faisabilité des MP de IDA / 57180 Post Consultant Open 1,000.00 1,394.24 Completed development support 27 08 15 15 05 02 09 04 24 09 Construction de 01 forage à Selection PMH à L'EP TCHOURA BIZILI cmne de Touloum CM-CRC EXTREME NORD- 58649-CS-INDV / Sélection d'un consultant pour etudes Individual de faisabilité des MP de Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- IDA / 57180 Post Consultant Open 1,600.00 1,401.01 Completed construction d'un bloc de 03 development support 27 08 15 22 05 02 09 04 24 09 Selection boutiques au marché centrale de Touloum et 02 boutiques au marché de SAOTSAI 1 CM-CRC EXTREME NORD- 58694-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-05- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-12- Construction d'un CSI d'un IDA / 57180 Post Consultant Open 5,600.00 4,897.34 Completed development support 27 08 15 24 05 02 09 06 24 08 logement d'astreinte et d'un Selection incinerateur et d'un bloc latrine à Danigué et à Nguéring (06 MP) CM-CRC EXTREME NORD- 58325-CS-INDV / sélection d1 consultant pour le suivi/controle des travaux de Construction d'un bloc Individual Component A: Local 2017-09- 2017-09- 2017-09- 2017-09- 2017-10- 2017-11- 2017-11- 2017-11- 2018-02- de 02 salles de classe et de IDA / 57180 Post Consultant Limited 6,200.00 5,558.23 Signed development support 12 12 17 12 08 04 12 06 10 latrines à l'EP de Mayel Béi Selection et l'EP de Palaoudi et travaux de construction d'un bloc maternel à EM de Zokok-Laddeo cmne de Maroua 1 CM-CRC EXTREME NORD- 58591-CS-INDV / Sélection d'un Consultant pour le Individual Suivi/contrôle des Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2019-02- IDA / 57180 Post Consultant Open 3,936.00 3,082.22 Signed TRAVAUX DE development support 02 01 20 16 11 27 15 18 11 Selection REHABILILATION DU TRONCON HOTEL LE SAHEL- MAYO-KALIAO (0,7 KM) cmne DE MAROUA Ier CM-CRC EXTREME NORD- 58842-CS-INDV / Sélection d'un Consultant pour le Individual Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-10- 2018-08- 2018-11- 2019-02- Suivi/contrôle des TRAVAUX IDA / 57180 Post Consultant Open 3,802.00 3,274.86 Signed development support 02 03 20 08 11 16 15 29 11 DE REHABILILATION DE LA Selection PISTE SOUKOUDJO- BAGRISSE-FARARE (28 KM) CM-CRC EXTREME NORD- 58553-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-11- de construction d'un forage IDA / 57180 Post Consultant Open 2,690.00 2,075.63 Signed development support 02 01 20 16 11 27 15 27 13 productif équipé de pompe Selection manuelle à EP Louguéré à EP Ouro Nangué à Fakalao à Hodango CM-CRC EXTREME NORD- 58315-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual de construction d'un bloc de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- IDA / 57180 Post Consultant Open 3,947.00 2,940.47 Signed 02 salles de classe équipées development support 02 01 20 16 11 27 15 25 13 Selection et construction d'un bloc de latrines à trois compartiment à EP de WOUYANG et à l'EP de GONOZO CM-CRC EXTREME NORD- 58549-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- de Construction d'un atelier IDA / 57180 Post Consultant Open 2,871.00 1,729.69 Signed development support 02 01 20 16 11 27 15 25 13 de maçonnerie au CETIC de Selection Loulou et'un bloc de latrines à trois compartiments au CETIC de Loulou CM-CRC EXTREME NORD- 58669-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual de construction de 02 salles Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-11- 2019-06- IDA / 57180 Post Consultant Open 8,006.00 4,880.90 Completed de classe et d'un bloc de development support 02 01 20 16 11 27 15 01 13 18 Selection latrines au Lycée Tech de Gobo, à l'EP de GUIRIOU CENTR, au Lycée de DOM PYA, à la SAR/SM de Gobo dans la cmne de GOBO CM-CRC EXTREME NORD- 58684-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-10- 2019-05- de construction d'un bloc de IDA / 57180 Post Consultant Open 934.00 748.35 Completed development support 02 01 20 16 11 27 15 01 14 22 latrines a quatre (04) Selection compartiments au marché de GOBO et de NOULDAINA dans la cmne de GOBO CM-CRC EXTREME NORD- 58850-CS-INDV / Sélection d'un Consultant pour le Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-09- 2019-03- Suivi/contrôle des Travaux IDA / 57180 Post Consultant Open 660.00 574.90 Completed development support 02 01 20 16 11 27 15 15 29 01 de construction d'un forage Selection équipé de PMH à l'EP de GUIRIOU CENTRE CM-CRC EXTREME NORD- 58558-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-11- 2018-08- 2018-12- 2018-11- de construction d'un bloc de IDA / 57180 Post Consultant Open 2,002.00 1,433.49 Signed development support 02 03 20 23 11 03 15 27 13 02 salles de classe équipées Selection et d'un bloc de latrines à trois compartiments au CES de Doukroye CM-CRC EXTREME NORD- 58560-CS-INDV / Sélection d'un Consultant pour le Individual Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-11- 2018-08- 2018-12- 2018-09- IDA / 57180 Post Consultant Open 643.00 517.42 Signed de construction d'un forage development support 02 03 20 27 11 03 15 18 14 Selection équipé de PMH à l'EP de Daloa (Doukroye) dans la cmne de KAIKAI CM-CRC EXTREME NORD- 58636-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual de construction d'un bloc de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-11- 2019-05- IDA / 57180 Post Consultant Open 4,013.00 2,853.99 Completed 02 salles de classe équipées development support 02 01 20 16 11 27 15 01 13 30 Selection et d'un bloc de latrines à trois compartiments à EP de Balane au CES de Sirlawé dans la cmne de KAR-HAY CM-CRC EXTREME NORD- 58634-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de construction d'un forage Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-11- équipé de PMH à l'EP de IDA / 57180 Post Consultant Open 3,845.00 2,594.54 Signed development support 02 01 20 16 11 27 15 01 13 Damdama à l'école des Selection parents de Gouloulou à l'EP Balane à l'EP de REY- FOULAYE à l'EP de Sadielle au CES de Sirlawe CM-CRC EXTREME NORD- 58701-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual de construction d'un bloc de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-11- IDA / 57180 Post Consultant Open 4,332.00 2,789.46 Signed 02 salles de classe équipées development support 02 01 20 16 11 27 15 17 13 Selection et d'un bloc de latrines à trois compartiments à l'EP de Bihoré à l'EP de Troké dans la, commue de Tchatibali. CM-CRC EXTREME NORD- 58848-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-11- de construction d'un forage IDA / 57180 Post Consultant Open 1,986.00 1,394.73 Signed development support 02 01 20 16 11 27 15 05 13 équipé de PMH à l'EP Selection Saouringwa, à Kada et 'a Glonheme dans la cmne de Tchatibali CM-CRC EXTREME NORD- 58615-CS-INDV / Sélection d'un Consultant pour le Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-10- Suivi/contrôle des Travaux IDA / 57180 Post Consultant Open 2,026.00 1,917.50 Signed development support 02 01 20 16 11 27 15 03 14 de construction d'un forage Selection équipé de PMH à Bibalé - Gambour à Goubara à Kassilé CM-CRC EXTREME NORD- 58667-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de réhabilitation de la mare Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-11- de Garey Kaélé, IDA / 57180 Post Consultant Open 2,320.00 1,917.50 Signed development support 02 01 20 23 11 30 15 18 13 Construction d'un forage Selection pastoral à énergie solaire Garey Kaélé et construction d'un forage équipé de PMH à Kassilé dans la commue de Kaele CM-CRC EXTREME NORD- 58555-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual de construct de 02 salles Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- IDA / 57180 Post Consultant Open 7,921.00 5,839.65 Signed de classe équipées et bloc development support 02 01 20 16 11 27 15 15 13 Selection latrines à l'EP de Badjafe, à l'EP de Zouana à l'EP de Tchabeyel et EP de Goudjouing cmne de Kaele. CM-CRC EXTREME NORD- 58641-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des travaux Individual Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-11- 2018-08- 2018-11- 2018-11- de construction de 02 salles IDA / 57180 Post Consultant Open 3,687.00 2,782.38 Signed development support 02 03 20 26 11 03 15 07 13 de classe et d'un bloc de Selection latrines à EP Mayel -Guinadj et 02 salles de classe à l'EP de KALAF cmne de Moutourwa. CM-CRC EXTREME NORD- 58703-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des travaux Individual Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-11- 2018-08- 2018-11- 2018-11- de construction de 01 IDA / 57180 Post Consultant Open 2,696.00 2,086.79 Signed development support 02 03 20 26 11 03 15 19 13 forage équipé de PMH à Selection Ganaha, à EP de Dourloum à EP de KALAF et EP de Mayel- guinadji dans la cmne de moutourwa CM-CRC EXTREME NORD- 58306-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôletravaux de construction de 02 salles de Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- 2019-01- classe et d'un bloc de IDA / 57180 Post Consultant Open 2,339.00 1,656.24 Completed development support 02 01 20 23 11 30 15 25 13 03 latrines à l'EP de GABOUA et Selection Equipements en tables- bancs et bureauxà l'EP de KOZA 1, Koza 2 et Gaboua dans la cmne de KOZA CM-CRC EXTREME NORD- 58522-CS-INDV / Sélection d'un Consultant pour le Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-10- Suivi/contrôle des Travaux IDA / 57180 Post Consultant Open 1,596.00 1,391.14 Signed development support 02 01 20 16 11 30 15 15 14 de construction d'un forage Selection équipé de PMH à EM Moskota et à l'EP GOKORO CM-CRC EXTREME NORD- 58708-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual de travaux de construction Component A: Local 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2018-11- 2018-11- IDA / 57180 Post Consultant Open 3,809.00 3,138.14 Signed de 02 salles de classe et development support 02 01 20 23 11 30 15 07 13 Selection d'un bloc de latrines au CETIC D'OUZAL et Construction d'un bloc de deux salles de classe équipées à l'EP KARAZAWA CM-CRC EXTREME NORD- 58298-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual Component A: Local 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2018-11- 2018-09- de construction d'un bloc IDA / 57180 Post Consultant Open 4,136.00 3,312.48 Signed development support 02 01 20 23 11 30 15 07 29 maternelle à EM de Selection MOSKOTA et Construction d'un bloc de salle de classe équipé à l'EP KORSAMBA CM-CRC EXTREME NORD- 58692-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction d'un bloc Individual de deux salles de classe Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- IDA / 57180 Post Consultant Open 6,000.00 3,504.25 Signed équipées et d'un bloc development support 02 01 20 23 11 30 15 25 13 Selection latrines a trois compartiments au CES de Mazaya à EP ZELE (Soulédé) (lot01) à EP de Doumbéré(lot02) cmne de ROUA CM-CRC EXTREME NORD- 58291-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des construct de 02 SC equipées Gouvaka Individual Component A: Local 2018-05- 2018-08- 2018-06- 2018-09- 2018-07- 2018-10- 2018-08- 2018-10- 2018-09- Chefferie et équipement IDA / 57180 Post Consultant Open 5,825.00 4,178.33 Signed development support 02 03 20 03 11 16 15 22 29 bureau et construct de 02 Selection SC equipées à L'EP de Majéconstruct de 02 SC equipées et équipement SC existantes à L'EP de Malika CM-CRC EXTREME NORD- 58612-CS-INDV / Sélection d'un Consultant pour le Individual Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-10- 2018-08- 2018-11- 2018-10- Suivi/contrôle des Travaux IDA / 57180 Post Consultant Open 1,647.00 1,220.39 Signed development support 02 03 20 06 11 16 15 06 14 de construction d'un forage Selection équipé de PMH à Koulang à Mangavé cmne de MORA CM-CRC EXTREME NORD- 58556-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-10- 2018-08- 2018-10- 2018-11- de construction de 01 IDA / 57180 Post Consultant Open 2,912.00 2,440.77 Signed development support 02 03 20 08 11 16 15 22 13 magasin de stockage de Selection cereale à Sera -Idoumda et de conservation d'oignon àà Kourgui cmne de MORA Page 10 CM-CRC EXTREME NORD- 58593-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle de Travaux Individual de Construction d'un bloc Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- IDA / 57180 Post Consultant Open 2,409.00 2,085.86 Signed de 02 salles de classe development support 02 01 20 01 11 27 15 14 13 Selection équipées à EP de Gance et d'un bloc de latrines à trois compartiments à L'EP TOLKOMARI cmne de Kolofata CM-CRC EXTREME NORD- 58609-CS-INDV / Selction d un consultant pour le Individual suivi/controle Travaux de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- 2019-08- IDA / 57180 Post Consultant Open 3,990.00 2,789.46 Completed Construction de deux bloc development support 02 01 20 16 11 27 15 24 13 02 Selection de 02 salles de classe équipées aux CES TOLKOMARI I cmne de Kolofata. CM-CRC EXTREME NORD- 58666-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle de Travaux Individual de Construction d'un forage Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-11- IDA / 57180 Post Consultant Open 3,358.00 2,615.12 Signed équipé de PMH à l'EP GANCE development support 02 01 20 16 11 27 15 16 13 Selection au CES Toltomari et Réalisation d’un forage solaire avec borne fontaine à Kolofata cmne de Kolofata CM-CRC EXTREME NORD- 58646-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Individual Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-10- 2018-08- 2018-10- 2018-11- 2019-03- de Construction d'un bloc IDA / 57180 Post Consultant Open 5,520.00 3,897.16 Completed development support 02 03 20 05 11 08 15 12 13 12 de 02 salles de classe Selection équipées s à EP Chéoulew au CES de Makalingaï (lot01)à EP Tazang (lot02) cmne de Tokombere CM-CRC EXTREME NORD- 58545-CS-INDV / Sélection d'un Consultant pour le Individual Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-10- 2018-12- IDA / 57180 Post Consultant Open 1,226.00 1,420.87 Completed de Construction de 01 development support 02 01 20 01 11 27 15 22 14 18 Selection forage équipé de PMH à Baka-Fourwa et à Djaltar dans la cmne de Tokombere CM-CRC EXTREME NORD- 58642-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Individual Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-12- 2018-11- BLOC DE DEUX SALLES DE IDA / 57180 Post Consultant Open 2,201.00 1,817.81 Signed development support 02 23 20 13 11 20 15 13 13 CLASSE EQUIPE ET D'UN Selection BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP KOUTOULA DANS LA CMNE DE BLANGOUA CM-CRC EXTREME NORD- 58705-CS-INDV / SUIVI CONTROLE DES TRAVAUX D'AMENAGEMENT D'UNE GARE ROUTIERE PAR LA Individual Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-12- 2019-09- CONSTRUCTION DE 04 IDA / 57180 Post Consultant Open 3,600.00 2,707.83 Completed development support 02 23 20 13 11 20 15 23 13 08 GUICHETS, 04 MAGASINS, Selection D'UN HANGAR D'ATTENTE ET D'UN BLOC LATRINE AVEC UN MUR D'ENCEINTE DE 130 m A BLANGOUA CM-CRC EXTREME NORD- 58559-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Individual Component A: Local 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- DE CONSTRUCTION D'UN IDA / 57180 Post Consultant Open 1,482.00 856.87 Signed development support 02 23 20 19 11 20 15 27 13 FORAGE EQUIPE DE PMH A la Selection gare routiere de BLANGOUA ET A L'EP DE KOUTOULA DANS LA CMNE DE BLANGOUA CM-CRC EXTREME NORD- 58681-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Individual Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- 2019-02- DE CONSTRUCTION D'UN IDA / 57180 Post Consultant Open 4,057.00 4,474.93 Completed development support 02 23 20 13 11 20 15 24 13 02 FORAGE PASTORAL A Selection ENERGIE SOLAIRE A KARENA ET A NAGA DANS LA CMNE DE DARAK CM-CRC EXTREME NORD- 58838-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Individual Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-12- 2018-11- 2019-07- CLASSE EQUIPE ET D'UN IDA / 57180 Post Consultant Open 3,756.00 3,047.10 Completed development support 02 23 20 16 11 20 15 03 13 05 BLOC DE LATRINES A TROIS Selection COMPARTIMENTS A L’EP HILELLE ) ET CONSTRUCTION D'UN HANGAR AU MARCHE DE GOULFEY GANA cmne DE GOULFEY CM-CRC EXTREME NORD- 58567-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA Individual Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-12- 2018-11- 2019-10- CONSTRUCTION DE 04 IDA / 57180 Post Consultant Open 3,656.00 2,698.86 Completed development support 02 23 20 16 11 20 15 17 13 11 GUICHETS, 04 MAGASINS, Selection D’UN HANGAR D’ATTENTE, 02 BOUTIQUES ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE DE 90 m A GOULFEY cmne DE GOULFEY CM-CRC EXTREME NORD- 58594-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Individual DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- IDA / 57180 Post Consultant Open 2,087.00 853.74 Signed FORAGE EQUIPES DE POMPE development support 02 23 20 13 11 20 15 27 13 Selection A MOTRICITE HUMAINE A MOUGALAM,A TAWOULWEBE ET A L'EP HILELE cmne DE HILE ALIFA CM-CRC EXTREME NORD- 58565-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Individual DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- IDA / 57180 Post Consultant Open 2,477.00 1,859.26 Signed BLOC DE DEUX SALLES DE development support 02 23 20 11 20 15 22 13 Selection CLASSE EQUIPE ET D'UN BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP GONONI CM-CRC EXTREME NORD- 58519-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Individual DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- IDA / 57180 Post Consultant Open 2,163.00 853.74 Signed FORAGE EQUIPE DE POMPE A development support 02 23 20 13 11 20 15 27 13 Selection MOTRICITE HUMAINE A MAFOULSO III, A FAMARE ET A L'EP DE GONONI cmne DE HILE ALIFA CM-CRC EXTREME NORD- 58608-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTIOND’UNE Individual Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- MINI AEP PASTORAL EQUIPE IDA / 57180 Post Consultant Open 4,043.00 3,065.26 Signed development support 02 23 20 13 11 20 15 27 13 DE DEUX ABREUVOIRS, Selection D’UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A ABASSOUNI, A DOLE BADA cmne DE HILE ALIFA CM-CRC EXTREME NORD- 58557-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Individual Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- BLOC DE DEUX SALLES DE IDA / 57180 Post Consultant Open 2,350.00 1,735.98 Signed development support 02 23 20 16 11 20 15 24 13 CLASSE EQUIPE ET D'UN Selection BLOC DE LATRINES A TROIS COMPARTIMENTS AU CES D'ADJAÏNE A HILE HAOUSSA cmne DE KOUSSERI CM-CRC EXTREME NORD- 58569-CS-INDV / SELECTION CONSULTANT Individual SUIVI/CONTROLE TRAVAUX Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-12- 2018-11- IDA / 57180 Post Consultant Open 1,975.00 1,629.76 Signed DE CONSTRUCTION D'UN development support 02 23 20 16 11 20 15 03 13 Selection HANGAR AVEC BLOC LATRINE AU MARCHE DE BIAMO, cmne DE MAKARI CM-CRC EXTREME NORD- 58691-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Individual DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- 2019-07- IDA / 57180 Post Consultant Open 2,201.00 1,629.76 Completed BLOC DE DEUX SALLES DE development support 02 23 20 16 11 20 15 24 13 20 Selection CLASSE EQUIPE ET D'UN BLOC DE LATRINES A TROIS COMPARTIMENTS A L'EP DE MALTAM cmne DE MAKARI CM-CRC EXTREME NORD- 58495-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Individual DEs MP D'INSTALLATION Component A: Local 2018-05- 2018-06- 2018-07- 2018-08- 2018-10- IDA / 57180 Post Consultant Open 2,017.00 0.00 Canceled D'ECLAIRAGE PUBLIC (10 development support 02 20 11 15 14 Selection KITS)AVEC ENERGIE SOLAIRE DE L'AXE MAIRIE DE HILE ALIFA-BRIGADE DE GENDARMERIE DE HILE CM-CRC EXTREME NORD- 38340-CS-INDV / Suivi/contrôle des Travaux construction d'un forage Individual Component A: Local 2017-11- 2018-02- 2017-12- 2017-12- 2018-01- 2018-04- équipé de PMH dans les IDA / 57180 Post Consultant Limited 3,477.00 0.00 Canceled development support 27 05 02 23 27 27 localités de Kaliao, Selection Goulmoyo, Mbozo Mofou, Balewa et Manguirdla (Lot1) COMMUNE DE MERI CM-CRC EXTREME NORD- 38342-CS-INDV / Suivi/contrôle technique et environnemental des travaux de construction Individual d'un forage équipé de PMH Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 Post Consultant Limited 6,954.00 5,699.52 Signed dans les localités de Kaliao, development support 27 05 02 28 23 04 27 06 27 Selection Goulmoyo, Mbozo Mofou, Balewa et Manguirdla, Moundour Foulbé, Dogba Maliki, Magawa, Houloum et Tchaki djébé Commune de MERI CM-CRC EXTREME NORD- 83169-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-06- 2018-10- 2018-08- 2018-10- 2018-08- 2018-10- 2018-09- 2018-10- 2018-11- 2019-12- IDA / 57180 Post Consultant Open 4,500.00 3,858.02 Completed environnementales des MP development support 15 08 03 26 24 27 28 27 12 19 Selection d'électrification de la localité de Dargala centre- Lycée de Dargala et Dargala- Hodande Commune de Dargala. CM-CRC EXTREME NORD- 83165-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Individual Component A: Local 2018-06- 2018-10- 2018-08- 2018-10- 2018-08- 2018-10- 2018-09- 2018-10- 2018-11- 2018-12- construction d'un (01) IDA / 57180 Post Consultant Open 3,500.00 3,542.39 Completed development support 15 08 03 25 24 27 28 27 12 19 forage à PMH à Dargala- Selection Centre à Hardéo-Golo à Yonkolel à Toupouré- Sirataré à Wirdiwo à Ouro- Domayo à Ouro-Hitgo Commune de Dargala. CM-CRC EXTREME NORD- 83171-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2019-01- IDA / 57180 Post Consultant Open 4,000.00 4,048.44 Completed environnementales des MP development support 15 08 03 25 24 27 28 29 14 03 Selection de Rehabilitation des routes dans les quartiers de Wourndé II, III, VI long d'environ 3 km Commune de Maroua II. CM-CRC EXTREME NORD- 83155-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-12- 2019-03- 2019-01- IDA / 57180 Post Consultant Open 4,000.00 4,223.60 Completed environnementales des MP development support 15 08 03 25 24 27 28 06 14 03 Selection d'extension du réseau électrique dans les quartiers de Wourndé II, III, VI Commune de Maroua II. CM-CRC EXTREME NORD- 83158-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- IDA / 57180 Post Consultant Open 1,600.00 1,709.83 Completed environnementales des MP development support 15 10 03 26 24 27 28 29 14 22 Selection de Construction d’une aire d’abattage d’un bloc latrines et d’un forage à Doursoungo Commune de Maroua III. CM-CRC EXTREME NORD- 83143-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual environnementales des MP Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-02- 2018-11- IDA / 57180 Post Consultant Open 3,000.00 3,570.54 Completed d'éclairage public à energie development support 15 08 03 24 24 27 28 29 27 08 Selection solaire dans les localités de Mindif, Ouro Bouné, Modjombodi, Djodjong et Djouta Wade Commune de Mindif CM-CRC EXTREME NORD- 83159-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilitédes MP de Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- construction et équipement IDA / 57180 Post Consultant Open 5,000.00 5,149.62 Completed development support 15 08 03 26 24 27 28 29 14 08 d'un CSI à Hoppo et Selection fourniture en équipement dans les CSI de Mindif de Modjombodi de Maoundine et de Mogom Commune de Mindif. CM-CRC EXTREME NORD- 83145-CS-INDV / Sélection d'1 consultant pour EF des MP de Construction d'1 bloc de 02 salles classe et Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- d'1 bloc de latrines à EP IDA / 57180 Post Consultant Open 5,400.00 5,984.42 Completed development support 15 10 03 25 24 27 28 27 14 23 Rebede au CES de Selection Dongrosse au CES de Soueye,à EP Mbiteu à EP Lobokri à EP SAIGA et équipements à l'EP Danhou Commune de Dziguilao. CM-CRC EXTREME NORD- 83147-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- IDA / 57180 Post Consultant Open 1,200.00 2,665.22 Completed environnementales des MP development support 15 08 03 23 24 27 28 23 14 23 Selection de construction d'un (01) forage à PMH à l’EP de SAIGA et de Lobokri dans la Commune de Dziguilao. . CM-CRC EXTREME NORD- 83160-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité de Construction Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- IDA / 57180 Post Consultant Open 3,369.00 3,040.99 Signed d'un bloc de 02 salles de development support 15 08 03 26 24 27 28 28 14 Selection classe équipées et d'un bloc de latrines à EP Guidima, à EP Kankrwa, à EP Golonpoui dans la Commune de Datcheka. CM-CRC EXTREME NORD- 83188-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- construction d'1 forage à IDA / 57180 Post Consultant Open 3,500.00 3,625.14 Completed development support 15 08 03 27 24 27 28 27 14 27 PMH à EP Kankrwa, à EP Selection Golonpoui, à l'abattoir du marché de Zouaye, à Gaï Gaï, à Tining, à Tibali et à Lara dans la Commune de Datcheka. CM-CRC EXTREME NORD- 83167-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- faisabilité techniques et IDA / 57180 Post Consultant Open 1,130.00 1,519.93 Completed development support 15 08 03 26 24 27 28 29 14 27 environnementales des MP Selection de construction d'un abattoir au marché de Zouaye Commune de Datcheka. Page 11 CM-CRC EXTREME NORD- 83151-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2019-12- Construction d'un bloc de IDA / 57180 Post Consultant Open 4,500.00 4,385.81 Completed development support 15 10 03 26 24 27 28 27 14 12 deux salles de classe Selection équipées au CES d'Agolla, au CES de Dabaye, au CES de Widigue, au CETIC de Vele et au Lycée de Kartoua Commune de Gueme. CM-CRC EXTREME NORD- 83168-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- IDA / 57180 Post Consultant Open 1,900.00 1,910.99 Completed environnementales des MP development support 15 10 03 26 24 27 28 29 14 12 Selection de Construction d'un hangar au marché de Dabaye et d'un bloc de latrines VIP au marché de Gabaraye commune de Gueme. CM-CRC EXTREME NORD- 83191-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- faisabilité techniques et IDA / 57180 Post Consultant Open 1,900.00 1,909.51 Completed development support 15 08 03 26 24 27 28 29 14 12 environnementales des MP Selection de Construction d'une boucherie et d'un hangar au marché de Vele commune de Gueme. CM-CRC EXTREME NORD- 83148-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-12- 2019-03- 2018-12- d'extention de l'électricité IDA / 57180 Post Consultant Open 6,000.00 5,903.98 Completed development support 15 08 03 26 24 27 28 06 14 14 dans la localité de Maga et Selection electrification du marché de Guirvidig des quartiers environnant et de la localité de Yanga Commune de Maga. CM-CRC EXTREME NORD- 83187-CS-INDV / Sélection d'1 consultant élaboration des EF des MP Construction d'1 bloc de 02 salles de Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- classe équipées et 01 bloc IDA / 57180 Post Consultant Open 5,600.00 4,723.18 Completed development support 15 08 03 25 24 27 28 29 14 15 latrines à EP Djenreng à EP Selection Djarwar à EP Vaidou à EP Waimou à EP Bigdi à EP Guidoua à EP Goulourgou au CES de Kamargui Commune Wina. CM-CRC EXTREME NORD- 83153-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Individual Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- construction de 01 forage à IDA / 57180 Post Consultant Open 2,400.00 3,469.96 Completed development support 15 08 03 25 24 27 28 29 14 15 énergie solaire au CSI de Selection Bosgoye d’01 forage pastoral à énergie solaire à Djongdong et d’un forage à PMH à EP Vaidou Comune de Wina CM-CRC EXTREME NORD- 83156-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- faisabilité techniques et IDA / 57180 Post Consultant Open 2,400.00 4,853.80 Signed development support 27 08 15 26 05 02 09 06 24 environnementales des MP Selection de contruction d’un mini AEP aux CSI de Danigué et Nguéring Commune de Guere. CM-CRC EXTREME NORD- 83184-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- IDA / 57180 Post Consultant Open 3,000.00 3,037.47 Completed environnementales des MP development support 15 08 03 26 24 27 28 29 14 07 Selection de construction de 04 blocs de 10 boutique et Construction de latrines VIP au marché de HINA CM-CRC EXTREME NORD- 83185-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- environnementales des MP IDA / 57180 Post Consultant Direct 1,600.00 1,633.42 Signed development support 15 11 25 13 15 18 20 06 03 de Construction d'un bloc Selection de deux salles de classe équipées et un bloc latrines a trois compartiments à Magala-Djamene Commune Darak. CM-CRC EXTREME NORD- 83146-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- faisabilité techniques et IDA / 57180 Post Consultant Direct 3,700.00 3,357.24 Signed development support 15 11 25 18 15 25 20 25 03 environnementales des MP Selection d'electrification en énergie solaire de l'auberge municipal et hôtel de ville de Darak CM-CRC EXTREME NORD- 83164-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Individual Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- 2018-12- Construction d'1 bloc de IDA / 57180 Post Consultant Direct 5,000.00 6,462.69 Completed development support 15 11 25 17 15 18 20 05 03 14 deux salles de classe Selection équipées et un bloc latrines à EP DEGA, à EP GADAFAI, à EP NIGUE et à EP WAROU I Commune Fotokol. CM-CRC EXTREME NORD- 83190-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- IDA / 57180 Post Consultant Direct 3,000.00 2,685.79 Signed Construction d’un (01) development support 15 11 25 25 15 25 20 25 03 Selection forage PMH dans les lotalités de Amssadeck, de Barkari II, de Djabrari, de Haigayo II Commune Fotokol. CM-CRC EXTREME NORD- 83142-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Individual Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- 2018-12- Construction d'un bloc de IDA / 57180 Post Consultant Direct 2,500.00 3,277.70 Completed development support 15 01 25 11 15 18 20 05 03 14 deux salles de classe Selection équipées et un bloc latrines a trois compartiments à EP WAROU II et à EP OH HAMADIE Commune Fotokol. CM-CRC EXTREME NORD- 83149-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- IDA / 57180 Post Consultant Direct 3,000.00 2,685.79 Signed Construction d’un (01) development support 15 11 25 11 15 18 20 23 03 Selection forage PMH dans les lotalités de Kabetoua, de OH Isseini, de Warou II et de Worokaime Commune Fotokol. CM-CRC EXTREME NORD- 83152-CS-INDV / Sélection d'1 consultant pour l'élaboration des EF des MP de Construction d'1 bloc de Individual Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- deux salles de classe IDA / 57180 Post Consultant Direct 3,800.00 5,427.12 Signed development support 15 11 25 11 15 18 20 05 03 équipées et 01 bloc latrines Selection à EP DAVA à EP Kabéla et à EP Beré et fourniture en equipement pour les EP Commune Logone-Birni. CM-CRC EXTREME NORD- 83141-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques des Individual Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2019-10- 2018-12- 2018-11- 2019-02- MP de Construction d’un IDA / 57180 Post Consultant Direct 4,200.00 5,091.18 Signed development support 15 11 25 11 15 18 20 06 03 (01) forage PMH dans les Selection lotalités de Ounangaré de Ngada I de Ngada II de Michiska Mousgoum de Marafine I de SHI commune de Logone-Birni CM-CRC EXTREME NORD- 83162-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- faisabilité techniques et IDA / 57180 Post Consultant Direct 1,600.00 1,678.62 Signed development support 15 11 25 17 15 18 20 06 03 environnementales des MP Selection de Construction d'un magasin de stockage de cereale à Zigagué Commune de Waza CM-CRC EXTREME NORD- 83150-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- IDA / 57180 Post Consultant Direct 2,400.00 2,280.74 Signed environnementales des MP development support 15 11 25 11 15 18 20 31 03 Selection de Construction d’un (01) forage PMH dans les lotalités de Ndiguina, de Malia et de Mada 1 Commune de Waza CM-CRC EXTREME NORD- 83140-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-11- 2019-02- IDA / 57180 Post Consultant Direct 4,000.00 5,913.04 Signed environnementales des MP development support 15 11 25 11 15 13 20 16 03 Selection de construction d’une mini approvisionement en eau potable à Zigagué Commune de Waza CM-CRC EXTREME NORD- 83154-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Individual Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- environnementales des MP IDA / 57180 Post Consultant Direct 2,000.00 2,044.34 Signed development support 15 11 25 11 15 18 20 06 03 de Construction d'un bloc Selection de deux salles de classe équipées et un bloc latrines a trois compartiments à EP de Davagang Commune Zina. CM-CRC EXTREME NORD- 83161-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- IDA / 57180 Post Consultant Direct 2,400.00 2,182.21 Signed environnementales des MP development support 15 11 25 25 15 25 20 25 03 Selection de Construction d’un (01) forage PMH dans les lotalités de ZAMA et de Gadabou Commune de ZINA CM-CRC EXTREME NORD- 58303-CS-INDV / Sélection Individual d'un Consultant pour le Component A: Local 2018-05- 2018-06- 2018-07- 2018-08- 2018-09- IDA / 57180 Post Consultant Open 1,735.00 0.00 Canceled Suivi/contrôle des Travaux development support 02 20 11 15 29 Selection Construction d'une clôture à EM de MOZOGO CM-CRC EXTREME NORD- 58550-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE CONSTRUCTION D’UNE MINI Individual Component A: Local 2018-05- 2018-06- 2018-07- 2018-08- 2018-10- AEP PASTORAL EQUIPE DE IDA / 57180 Post Consultant Open 2,004.00 0.00 Canceled development support 02 20 11 15 14 DEUX ABREUVOIRS, D’UNE Selection POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A MAGALAKABIR, DANS LA CMNE DE DARAK CM-CRC EXTREME NORD- 58544-CS-INDV / SUIVI/CONTROLE CONSTRUCTION D'UN FORAGE EQUIPE DE POMPE A Individual MOTRICITE HUMAINE AU Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-08- 2018-11- IDA / 57180 Post Consultant Open 4,382.00 0.00 Canceled CES D'ADJAINE ET D'UNE development support 02 23 20 11 15 13 Selection MINI AEP PASTORAL EQUIPE DE DEUX ABREUVOIRS, D'UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A LACTA 1, MASSAKI CM-CRC EXTREME NORD- 58518-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Individual DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-08- 2018-11- IDA / 57180 Post Consultant Open 2,090.00 0.00 Canceled FORAGES EQUIPES DE POMPE development support 02 23 20 11 15 13 Selection A MOTRICITE HUMAINE A MASSIO-GOURGOURA, A NAGA NDIGUINI, A EP MALTAM. cmne DE MAKARI CM-CRC EXTREME NORD- 111116-CS-INDV / suivi controle des travaux de Individual construction d'un bloc de 02 Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-10- 2019-12- IDA / 57180 Post Consultant Open 1,986.00 2,044.34 Signed salles de classe équipé et development support 03 17 22 11 12 05 16 09 15 Selection d'un bloc de latrines au CETIC de Tchévi dans la commune de Bourha CM-CRC EXTREME NORD- 111253-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2020-03- 2019-12- construction d'un forage IDA / 57180 Post Consultant Open 2,617.00 2,253.55 Signed development support 03 17 22 24 12 05 16 02 15 PMH au CETIC de Tchévi, à Selection Zouvou- yolde à DOUVA et à ZEU dans la commune de Bourha CM-CRC EXTREME NORD- 111266-CS-INDV / suivi controle des travaux de Individual construction des caniveaux Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-10- 2019-12- IDA / 57180 Post Consultant Open 2,774.00 2,545.59 Signed en BA à Bourha (axe development support 03 17 22 24 12 05 16 09 15 Selection Hamadou -ZRA-Bello Hayatou) et à Boukoula face commissariat ( dans la Commune de Bourha CM-CRC EXTREME NORD- 111262-CS-INDV / suivi controle des travaux de construction de 2 blocs de Individual 10 boutiques au marché de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-11- 2020-01- IDA / 57180 Post Consultant Open 10,360.00 13,312.67 Signed HINA cote A l1 et development support 03 17 22 24 12 01 16 15 14 Selection construction de 2 blocs de 10 boutiques au marché de HINA et latrines vip au marché de HINA cote B lot (02), commune de HINA. CM-CRC EXTREME NORD- 111341-CS-INDV / suivi controle des travaux de construction de 01 forage à Individual Component A: Local Under 2019-06- 2021-01- 2019-07- 2019-08- 2019-09- 2019-12- PMH à Yoldé-Naggué, à IDA / 57180 Post Consultant Open 4,014.00 0.00 development support Implementation 03 06 22 12 16 15 Tchakamadjé, Yaga djibiwo, Selection à Bakourebi (Abba wollo) Toukou mayel(Ouro-Bedem) et à MAYA ,commune de Pétté CM-CRC EXTREME NORD- 111359-CS-INDV / suivi controle des travaux de Individual construction d'un mini Component A: Local Under 2019-06- 2021-01- 2019-07- 2019-08- 2019-09- 2019-12- IDA / 57180 Post Consultant Open 2,094.00 0.00 adduction d'eau à energie development support Implementation 03 06 22 12 16 15 Selection photovoltaique pour usage agricole a fadare dans la commune de pette CM-CRC EXTREME NORD- 111337-CS-INDV / suivi controle des travaux de construction d'un bloc de Individual deux salles de classe Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2020-01- IDA / 57180 Post Consultant Open 8,296.00 8,954.03 Signed équipées et d'un bloc de development support 03 17 22 24 12 25 16 15 14 Selection latrines à trois compartiments à EP SAIGA, EP LOBOKRI, EP MBITEU et CES SOUEYE dans la Commune de Dziguilao CM-CRC EXTREME NORD- 111334-CS-INDV / suivi controle des travaux de Individual construction d'un bloc de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-12- 2019-12- IDA / 57180 Post Consultant Open 1,900.00 1,678.62 Signed deux salles de classe development support 03 17 22 24 12 28 16 06 15 Selection équipées et d'un bloc latrine à trois compartiments à l'EP de Ligazang, commune de Mindif CM-CRC EXTREME NORD- 111352-CS-INDV / suivi controle des travaux de construction et équipement d'un csi avec incinerateur et Individual Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-12- 2020-01- latrines à MATFAI, et IDA / 57180 Post Consultant Open 7,281.00 5,108.10 Signed development support 03 17 22 24 12 05 16 06 14 Fourniture en mobilier et Selection petit materiel sanitaire de CSI de Mindif, de Modjombodi, de Maoudine et de Mogom dans la commune de Mindif Page 12 CM-CRC EXTREME NORD- 111263-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2019-11- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-12- 2019-12- construction d'un forage IDA / 57180 Post Consultant Open 1,524.00 1,702.70 Signed development support 03 25 22 24 12 22 16 06 15 pastoral a energie Selection photovoltaique au marché à bétail à Moulvoudaye CM-CRC EXTREME NORD- 111348-CS-INDV / suivi controle des travaux d'aménagement du marché Individual à bétail en contruisant un Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-12- 2020-01- IDA / 57180 Post Consultant Open 2,245.00 2,000.67 Signed parc à betail une cloture un development support 03 17 22 24 12 22 16 06 14 Selection quai d'embarquement et un bloc latrine a trois compartiments dans la Commune de Moulvoudaye. CM-CRC EXTREME NORD- 111264-CS-INDV / suivi controle des travaux de construction de 02 SDC et de latrines à EP KAOSSERE, à Individual Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2020-01- l'EP Ticheeo Kolandi à l'EP IDA / 57180 Post Consultant Open 9,364.00 4,784.86 Signed development support 03 17 22 24 12 28 16 25 14 Tchoura-Bizili et de SDC à Selection EPB Touloum et de 2 SDC AVEC BUREAUX A L’EPP SAOTSAI.Commune de Touloum CM-CRC EXTREME NORD- 111272-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-12- 2019-12- construction de 01 forage à IDA / 57180 Post Consultant Open 2,034.00 1,699.43 Signed development support 03 17 22 24 12 05 16 06 15 PMH à Gai gai, à EP Selection Golonpoui et à EP Kankwa, dans la commune de Datcheka CM-CRC EXTREME NORD- 111265-CS-INDV / suivi controle des travaux de construction d'un bloc de 02 Individual Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-12- 2019-12- salles de classe équipées et IDA / 57180 Post Consultant Open 5,988.00 4,866.93 Signed development support 03 17 22 24 12 06 16 06 15 avec un bloc de latrines à Selection trois compartiments à EP Golonpoui , EP Kankrwa et EP Guidima , dans la commune de Datcheka CM-CRC EXTREME NORD- 111236-CS-INDV / suivi controle des travaux de construction d'un bloc de Individual deux salles de classe Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2019-12- IDA / 57180 Post Consultant Open 7,041.00 10,911.03 Signed équipées au CETIC de Vélé, development support 03 17 22 24 12 24 16 18 15 Selection au CES de Widigue (lot01), au CES de Dabaye et au CES d'Agolla, (lot02) dans la commune de Guémé CM-CRC EXTREME NORD- 111273-CS-INDV / suivi controle des travaux de construction d'un hangar 52 Individual Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2019-12- places au marché de IDA / 57180 Post Consultant Open 2,706.00 3,058.97 Signed development support 03 17 22 24 12 23 16 05 15 Gabaraye et suivi controle Selection des travaux de construction d'un bloc de latrines au marché de Gabaraye, commune de Guémé CM-CRC EXTREME NORD- 111252-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2019-07- 2019-07- 2019-10- 2019-08- 2019-11- 2019-09- 2020-01- 2020-01- construction d'un centre de IDA / 57180 Post Consultant Open 5,098.00 3,615.78 Signed development support 03 24 22 29 12 05 16 06 14 santé intégré équipé et un Selection bloc de latrines au CSI à Nguéring, commune de Gueré CM-CRC EXTREME NORD- 111335-CS-INDV / suivi Individual controle des travaux de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2019-12- IDA / 57180 Post Consultant Open 1,308.00 1,678.62 Signed construction d'un bloc de 05 development support 03 17 22 24 12 23 16 05 15 Selection boutiques au marché d'Ardaf Commune de Guere CM-CRC EXTREME NORD- 111277-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2019-12- 2020-01- CONSTRUCTION DEUX IDA / 57180 Post Consultant Open 2,787.00 2,182.21 Completed development support 03 17 22 24 12 28 16 09 15 22 BLOCS DE CINQ (05) Selection BOUTIQUES AU MARCHÉ DE KALFOU, DANS LA COMMUNE DE KALFOU CM-CRC EXTREME NORD- 111340-CS-INDV / suivi controle des travaux de construction d'un forage Individual équipé de pompe à Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-12- 2019-12- IDA / 57180 Post Consultant Open 2,696.00 2,375.46 Signed motricité humaine à Gandou development support 03 17 22 24 12 05 16 06 15 Selection Golopo, au CES de Zaria, à Djada, réhabilitation d'un forage PMH à Delta Guibéré et Mandara, dans la commune de Kalfou CM-CRC EXTREME NORD- 111338-CS-INDV / suivi controle des travaux de construction d'un bloc de 02 Individual salles de classe équipées et Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-11- 2020-01- IDA / 57180 Post Consultant Open 9,791.00 82,526.23 Signed d'un bloc de latrines à development support 03 17 22 24 12 08 16 06 14 Selection troiscompartiments au CES Kamargui, à EP Goulourgou , EP Bigi, EP de Djenreng et EP Waimou commune de wina CM-CRC EXTREME NORD- 111256-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- 2019-10- 2019-07- 2019-11- 2019-11- construction d'un hangar de IDA / 57180 Post Consultant Open 3,051.00 3,357.24 Signed development support 01 17 20 24 10 23 15 05 12 28 places et d'une Selection boucherie au marché de Veleé, dans la commune de Guémé CM-CRC EXTREME NORD- 111346-CS-INDV / suivi controle des travaux Individual Component A: Local 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- 2019-12- 2019-07- 2019-12- 2019-10- d'éclairage public à energie IDA / 57180 Post Consultant Open 762.00 923.86 Signed development support 01 17 20 24 10 05 15 06 13 solaire de 07 poteaux Selection solaires dans le centre urbain de vele Commune GUEME CM-CRC EXTREME NORD- 111351-CS-INDV / suivi controle des travaux de Individual Component A: Local Under 2019-04- 2021-01- 2019-05- 2019-06- 2019-07- 2019-10- construction de 01 forage à IDA / 57180 Post Consultant Open 1,524.00 0.00 development support Implementation 01 07 20 10 15 13 énergie solaire à CSI de Selection Bosgoye, dans la commune de Wina CM-CRC EXTREME NORD- 111361-CS-INDV / suivi controle des travaux de construction 02 salles de Individual classe et de latrines à l'EP Component A: Local 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- IDA / 57180 Post Consultant Open 3,862.00 3,886.40 Signed BIJE construction de 2 development support 01 17 20 24 10 30 15 02 13 Selection salles de classeà EPPB de TOKOMBERE et equipement CES de makilingaidans la commune de Tokombere CM-CRC EXTREME NORD- 111326-CS-INDV / suivi controle des travaux de Individual construction d'un bloc de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-10- 2019-07- IDA / 57180 Post Consultant Open 2,692.00 2,517.93 Completed deux salle de classe équipés development support 01 08 20 06 10 16 15 25 13 25 Selection et d'un bloc latrines à Magala Djamene dans la commune de Darak CM-CRC EXTREME NORD- 111332-CS-INDV / suivi Individual controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-10- 2019-07- IDA / 57180 Post Consultant Open 762.00 839.08 Completed construction de 01 forage development support 01 08 20 07 10 16 15 21 13 17 Selection PMH à Magala Djamene, dans la commune de Darak CM-CRC EXTREME NORD- 111257-CS-INDV / suivi controle des travaux de construction d'un bloc de Individual deux salles de classe Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-09- 2019-11- IDA / 57180 Post Consultant Open 9,077.00 10,679.58 Signed équipées et d'un bloc de development support 01 08 20 07 10 16 15 10 12 Selection latrines à trois compartiments à EP GADAFAI, au Lycée de Fotokol à EP Magadji et à EP de GUEGUERI, commune de Fotokol CM-CRC EXTREME NORD- 111345-CS-INDV / suivi Individual Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-07- 2019-10- 2019-07- controle des travaux de IDA / 57180 Post Consultant Open 1,372.00 1,184.55 Completed development support 01 08 20 08 10 16 15 02 13 02 construction d'un magasin Selection de stockage à Goulfey CM-CRC EXTREME NORD- 111330-CS-INDV / suivi Individual controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-10- IDA / 57180 Post Consultant Open 1,921.00 1,687.46 Signed construction d'une mini AEP development support 01 08 20 07 10 16 15 25 13 Selection pastorale à énergie solaire à fadja commune de Hilé Alifa CM-CRC EXTREME NORD- 111342-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-10- 2019-07- construction de 01 forage IDA / 57180 Post Consultant Open 1,981.00 2,531.19 Completed development support 01 08 20 08 10 16 15 27 13 05 PMH à Michiska Mousgoum, Selection OUNANGARE et NGADA, dans la commune de Logone Birni CM-CRC EXTREME NORD- 111258-CS-INDV / suivi Individual controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-09- 2019-10- IDA / 57180 Post Consultant Open 1,921.00 2,531.19 Signed construction d'un magasin development support 01 08 20 07 10 16 15 21 13 Selection de stockage à zigague, dans la commune de Waza CM-CRC EXTREME NORD- 111356-CS-INDV / suivi Individual controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-07- 2019-10- IDA / 57180 Post Consultant Open 2,034.00 2,328.61 Signed construction d'un forage development support 01 08 20 07 10 16 15 19 13 Selection PMH à malia, NDIGUINA et MADA dans la commune de Waza CM-CRC EXTREME NORD- 83186-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Individual Component A: Local 2018-10- 2018-12- 2018-12- 2019-01- 2019-03- faisabilité techniques et IDA / 57180 Post Consultant Open 1,400.00 0.00 Canceled development support 15 03 24 28 14 environnementales des MP Selection de Construction d'un centre multimédia à Dziguilao dans la Commune de Dziguilao CM-CRC EXTREME NORD- 111318-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2019-11- 2019-07- 2019-08- 2019-09- 2019-11- construction d'un forage IDA / 57180 Post Consultant Open 610.00 0.00 Canceled development support 03 25 22 12 16 15 équipé de pompe à Selection motricité humaine a Djafgadjie, commue de yagoua CM-CRC EXTREME NORD- 111349-CS-INDV / suivi controle des travaux de construction D’UN BLOC DE Individual Component A: Local 2019-06- 2019-11- 2019-07- 2019-08- 2019-09- 2020-01- DEUX SALLES DE CLASSE IDA / 57180 Post Consultant Open 3,871.00 0.00 Canceled development support 03 25 22 12 16 14 AVEC BUREAUX EQUIPES au Selection CES de DJOGOIDI et au lycee de Vounaloum Commune de yagoua CM-CRC EXTREME NORD- 111370-CS-INDV / Sélection d'un consultant pour l'élaboration des Individual Component A: Local 2018-10- 2019-11- 2018-12- 2018-12- 2019-01- 2019-02- Etudes de faisabilité IDA / 57180 Post Consultant Open 2,200.00 0.00 Canceled development support 15 25 03 24 28 27 techniques et Selection environnementales de CONSTRUCTION D'UN BLOC DE MATERNITÉ ÉQUIPÉ AU CMA DE GAZAWA CM-CRC EXTREME NORD- 111234-CS-INDV / Sélection d'un consultant pour l'élaboration des Individual Component A: Local 2019-01- 2020-01- 2019-02- 2019-03- 2019-04- 2019-05- Etudes de faisabilité IDA / 57180 Post Consultant Open 1,000.00 0.00 Canceled development support 02 06 20 13 17 17 techniques et Selection environnementales d'un microprojet de construction d'un parc à bétail dans la commune de WINA CM-CRC EXTREME NORD- 111353-CS-INDV / suivi controle des travaux de Individual construction d'un CSI équipé Component A: Local 2019-06- 2020-03- 2019-07- 2019-08- 2019-09- 2020-01- IDA / 57180 Post Consultant Open 6,096.00 0.00 Canceled avec case d'astreinte, un development support 03 04 22 12 16 14 Selection incinérateur et un bloc de latrines au CSI Djiddeo Garre, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 111235-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité Individual Component A: Local 2019-04- 2020-03- 2019-05- 2019-06- 2019-07- 2019-08- techniques et IDA / 57180 Post Consultant Open 2,400.00 0.00 Canceled development support 01 04 20 10 15 29 environnementales de Selection construction d'un forage agricole à énergie solaire à Doumer et d'un construction d'un forage à énergie solaire à Djaodé CM-CRC EXTREME NORD- 111344-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2020-03- 2019-07- 2019-08- 2019-09- 2019-11- construction d'un forage IDA / 57180 Post Consultant Open 615.00 0.00 Canceled development support 03 04 22 12 16 15 équipé de PMH à lycee Selection bilingue dans la commue de Kaele CM-CRC EXTREME NORD- 111350-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2021-01- 2019-07- 2019-08- 2019-09- 2019-12- construction d’un forage à IDA / 57180 Post Consultant Open 1,178.00 0.00 Canceled development support 03 06 22 12 16 15 énergie solaire avec château Selection au centre de santé de Djiddéo, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 111357-CS-INDV / suivi Individual Component A: Local 2019-04- 2020-03- 2019-05- 2019-06- 2019-07- 2019-10- controle des travaux de IDA / 57180 Post Consultant Open 1,000.00 0.00 Canceled development support 01 04 20 10 15 13 réalisation d'un parc à bétail Selection dans la commune de Wina (GP) CM-CRC EXTREME NORD- 111347-CS-INDV / suivi controle des travaux de Individual Component A: Local 2019-06- 2020-03- 2019-07- 2019-08- 2019-09- 2019-11- construction d'un forage IDA / 57180 Post Consultant Open 630.00 0.00 Canceled development support 03 04 22 12 16 15 équipé de pompe à Selection motricité humaine à Bindiriel Danghou, commue de Tchatibali CM-CRC EXTREME NORD- 196621-CS-INDV / Suivi controle des travaux de Individual Construction d'un CSI Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-06- IDA / 57180 Post Consultant Open 4,838.00 0.00 équipé avec un incinérateur development support Implementation 30 06 27 17 21 21 Selection et un bloc de latrines au CSI Djiddeo Garre, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 196857-CS-INDV / Suivi controle des travaux de Individual Construction et équipement Component A: Local Under 2020-10- 2020-11- 2020-11- 2020-12- 2021-01- 2021-04- IDA / 57180 Post Consultant Direct 1,829.00 0.00 des blocs des salles de development support Implementation 30 26 18 09 13 13 Selection classes et d'un bloc de latrines au CES de GUINADJI Commune de Maroua III CM-CRC EXTREME NORD- 196547-CS-INDV / Suivi controle des travaux de Construction D’UN FORAGE Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- PASTORAL A ENERGIE IDA / 57180 Post Consultant Open 1,662.00 0.00 development support Implementation 30 06 27 17 21 22 SOLAIRE EQUIPE D’UN Selection FORAGE ET DE (02) ABREUVOIRS DANS LA LOCALITE DE DJONGDONG, COMMUNE DE WINA, CM-CRC EXTREME NORD- 196622-CS-INDV / Suivi controle des travaux de CONSTRUCTION D’UN Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- FORAGE PASTORAL A IDA / 57180 Post Consultant Open 1,600.00 0.00 development support Implementation 30 06 27 17 21 22 ENERGIE SOLAIRE EQUIPE Selection D’UN château ET DE (02) ABREUVOIRS DANS LA LOCALITE DEMIZILING WAILA MAYO, COMMUNE DE GAZAWA CM-CRC EXTREME NORD- 196544-CS-INDV / Suivi controle des travaux deTravaux d'Eclairage public Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- en énergie solaire de 10 IDA / 57180 Post Consultant Open 3,566.00 0.00 development support Implementation 30 06 27 17 21 22 poteaux à Ndoukoula de 14 Selection poteaux à Dagaï Kola et de 15 poteaux à Loulou Commune de Ndoukoula Page 13 CM-CRC EXTREME NORD- 196628-CS-INDV / Suivi controle des travaux de Individual Component A: Local 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-05- Construction d'un bloc de IDA / 57180 Post Consultant Open 1,752.00 0.00 Canceled development support 30 26 18 08 12 13 deux salles de classe Selection équipées au lycee de Goundaye Commune de Dziguilao. CM-CRC EXTREME NORD- 196564-CS-INDV / Suivi controle des travaux de Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- Construction d'un bloc de IDA / 57180 Post Consultant Open 1,805.00 0.00 development support Implementation 30 06 27 17 21 22 deux salles de classe Selection équipées à l'EP de ZANYAO Commune de YAGOUA CM-CRC EXTREME NORD- 196526-CS-INDV / Suivi controle des travaux de construction d’un forage Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- équipé de pompe à IDA / 57180 Post Consultant Open 3,238.00 0.00 development support Implementation 30 06 27 17 21 22 motricité humaine à Dinao, Selection Louggol palé, Kodadjiho, Hamadalao et Golombeswé Commune KALFOU CM-CRC EXTREME NORD- 196638-CS-INDV / Suivi controle des travaux de Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- Construction d'un forage IDA / 57180 Post Consultant Open 1,295.00 0.00 development support Implementation 30 06 27 17 21 22 équipé de PMH à douang et Selection dingue-Gabaraye Commune de Gueme CM-CRC EXTREME NORD- 196889-CS-INDV / Suivi controle des travaux d'eclairage public par la Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-02- fourniture et l'installation de IDA / 57180 Post Consultant Open 1,295.00 0.00 development support Implementation 30 06 18 08 12 21 12 poteaux solaires de l’axe Selection Sous-préfecture- Ngaoundéréo Commune de Kalfou CM-CRC EXTREME NORD- 196540-CS-INDV / Suivi controle des travaux de Construction d'un bloc de deux salle de classe Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- équipées à l'EPB DE MADA IDA / 57180 Post Consultant Open 3,810.00 0.00 development support Implementation 30 06 27 17 21 22 KOLKOCH ET A LEP Selection MAMBEZA et Construction d'un bloc de latrines à l'EPB DE MADA KOLKOCH ET Commune de Tokombere CM-CRC EXTREME NORD- 196623-CS-INDV / Suivi controle des TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- CONSTRUCTION DE 04 IDA / 57180 Post Consultant Open 3,810.00 0.00 development support Implementation 30 06 27 17 21 22 GUICHETS, 04 MAGASINS, Selection D’UN HANGAR D’ATTENTE ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE COMMUNE DE YAGOUA CM-CRC EXTREME NORD- 196853-CS-INDV / Suivi contrôle de la fourniture en Individual en equipement en 200 Component A: Local 2020-10- 2020-11- 2020-11- 2020-12- 2021-01- 2021-04- IDA / 57180 Post Consultant Direct 445.00 0.00 Canceled tables bancs, 4 bureaux, 4 development support 30 30 18 09 13 13 Selection chaises rembourées et 4 armoires à l'EP MAGA IIB Commune de Maga. CM-CRC EXTREME NORD- 196553-CS-INDV / Suivi controle des travaux Individual d'Eclairage public par la Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- IDA / 57180 Post Consultant Open 1,000.00 0.00 fourniture et l'installation de development support Implementation 30 06 27 17 21 22 Selection 3 poteaux solaires à Ouro Bone et 03 à Modjombodi Commune de Mindif CM-CRC EXTREME NORD- 196619-CS-INDV / Suivi Individual controle des travaux de Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-04- IDA / 57180 Post Consultant Open 1,000.00 0.00 Construction d’un forage development support Implementation 30 06 27 17 21 22 Selection PMH au centre de santé de Djiddéo Commune de Maroua III CM-CRC EXTREME NORD- 196626-CS-INDV / Suivi Individual controle des travaux de Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-04- IDA / 57180 Post Consultant Open 1,000.00 0.00 Construction d'un forage development support Implementation 30 06 27 17 21 22 Selection équipé de PMH de Yonkolel Commune de Dargala. CM-CRC EXTREME NORD- 196535-CS-INDV / Suivi controle des travaux de Construction d'un forage Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-04- équipé de PMH à lalepaki et IDA / 57180 Post Consultant Open 1,000.00 0.00 development support Implementation 30 06 27 17 21 22 Acquisition d’une caisse à Selection outils pour l’entretien des forages dans la commune de Commune de Touloum CM-CRC EXTREME NORD- 196576-CS-INDV / Suivi controle des travaux de Individual fourniture et installation Component A: Local Under 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-02- IDA / 57180 Post Consultant Open 1,000.00 0.00 d’un kit solaire pour development support Implementation 30 25 27 17 21 27 Selection l’alimentation en energie électrique du lycée de gabaraye. Commune Gueme. CM-CRC EXTREME NORD- 196627-CS-INDV / Suivi controle des travaux de Individual Component A: Local Under 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-04- Construction d'un forage IDA / 57180 Post Consultant Open 1,000.00 0.00 development support Implementation 30 06 27 17 21 22 équipé de pompe à Selection motricité humaine à Guermé Kalfou Commune de Kalfou CM-CRC EXTREME NORD- 196845-CS-INDV / Suivi contrôle de la fourniture en Equipement en 60 tables Individual Component A: Local 2020-10- 2020-11- 2020-11- 2020-12- 2021-01- 2021-04- bancs et un bureau à l'EP IDA / 57180 Post Consultant Direct 1,000.00 0.00 Canceled development support 30 26 18 09 13 13 Guinlaye et 111 tables Selection bancs et un bureau à l'EP BOGO SIRATARE I Commune de BOGO CM-CRC EXTREME NORD- 204438-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual environnementales des MP Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 Post Consultant Limited 3,800.00 0.00 de Construction de salles de development support Implementation 16 21 12 16 02 Selection classe équipées dans le complexe d'écoles publiques Grpe 1, 2, 3 et 4 de Fotokol, commune fotokol. CM-CRC EXTREME NORD- 204457-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual Component A: Local 2020-11- 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 Post Consultant Limited 4,200.00 0.00 Under Review development support 16 13 21 12 16 02 de travaux Rénovation et Selection équipement du CMA de Fotokol Commune de FOTOKOL CM-CRC EXTREME NORD- 204439-CS-INDV / Elaboration des Etudes de faisabilité des MP de Individual Construction d’un forage Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 Post Consultant Limited 3,400.00 0.00 équipé de pompe à development support Implementation 16 21 12 16 02 Selection motricité humaine à Mada (Ngroh), à Goura 2, à Labado, à Chou et réhabilitation d’un forage à Mada 1 Commune de Makary CM-CRC EXTREME NORD- 204435-CS-INDV / Elaboration des Etudes de Individual faisabilité techniques et Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-01- IDA / 62240 Post Consultant Limited 2,200.00 0.00 environnementales des MP development support Implementation 16 21 12 16 19 Selection de Construction d’une mini AEP au camp des réfugiés d’Afadé Commune de Makary CM-CRC EXTREME NORD- 204447-CS-INDV / Elaboration des Etudes de faisabilité techniques et environnementales des MP Individual Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- de Construction d’un bloc IDA / 62240 Post Consultant Limited 2,400.00 0.00 development support Implementation 16 21 12 16 02 de deux salles de classe Selection équipées avec bloc latrines à l’EP de Djamous à l’EP BODO (1 ET 2) et à l'EP BIAMO Commune de Makary CM-CRC EXTREME NORD- 204456-CS-INDV / Elaboration des Etudes de faisabilité des MP de Construction d’un bloc de Individual Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- deux salles de classe IDA / 62240 Post Consultant Limited 3,000.00 0.00 development support Implementation 16 21 12 16 02 équipées dans les EP gpe Selection 1A, 1B et Construction d’un bloc maternel à l’école maternelle de Logone Birni Commune de Logone Birni CM-CRC EXTREME NORD- 204441-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual environnementales des MP Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 Post Consultant Limited 3,000.00 0.00 de Construction et development support Implementation 16 21 12 16 02 Selection équipement d’une salle d’hospitalisation et bloc opératoire au CMA de Logone birni Commune de Logone Birni CM-CRC EXTREME NORD- 204443-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 Post Consultant Direct 1,600.00 0.00 development support Implementation 16 26 17 21 07 d'Equipement et fourniture Selection de médicaments aux CSI de Zizagué et CSI de Waza Commune de waza CM-CRC EXTREME NORD- 204436-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 Post Consultant Limited 1,600.00 0.00 development support Implementation 16 21 12 16 02 de Construction d’un forage Selection équipé de PMH à Tagawa Y/C etude complementaire Commune de Waza CM-CRC EXTREME NORD- 204381-CS-INDV / Elaboration des Etudes de Individual faisabilité techniques et Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 Post Consultant Limited 1,600.00 0.00 environnementales des MP development support Implementation 16 21 12 25 11 Selection d'Alimentation en énergie solaire du CSI de Kossa Commune de Mora CM-CRC EXTREME NORD- 204454-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 Post Consultant Direct 1,300.00 0.00 development support Implementation 16 26 17 21 07 de Equipement et fourniture Selection de médicaments au CSI de Kossa et au CSI de Méhé Emma Commune de Mora CM-CRC EXTREME NORD- 204455-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual environnementales des MP Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 Post Consultant Limited 2,900.00 0.00 de Construction d’un forage development support Implementation 16 21 12 16 02 Selection équipé de PMH à Yémé, Dandaya, à Koldima, Madina et au Camp des réfugiés de Méhé Emma Commune de Mora CM-CRC EXTREME NORD- 204445-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 Post Consultant Limited 2,200.00 0.00 development support Implementation 16 21 12 16 02 de Construction d’un bloc Selection de deux salles équipées à l’EP d’Igawa et kotcherehe Commune de Mora CM-CRC EXTREME NORD- 204444-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual environnementales des MP Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 Post Consultant Limited 3,600.00 0.00 Construction d’un bloc de development support Implementation 16 21 12 16 02 Selection 02 salles de classe à EPB Kosséhone, à EP NDROCK Tourou, EP de Wandaï Commune de Mokolo CM-CRC EXTREME NORD- 204458-CS-INDV / suivi- contrôle des travaux de Individual construction d’un bloc de Component A: Local Under 2020-11- 2021-01- 2020-12- 2020-12- 2021-01- 2021-05- IDA / 62240 Post Consultant Limited 2,285.71 0.00 deux salles de classe development support Implementation 26 06 01 22 26 26 Selection équipées avec bloc latrines à à l’EP d’Afadé Groupe 2 Commune Makary CM-CRC EXTREME NORD- 204386-CS-INDV / Elaboration des Etudes de Individual faisabilité techniques et Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- IDA / 62240 Post Consultant Limited 1,800.00 0.00 environnementales des MP development support Implementation 16 21 05 09 23 Selection de Construction d'un bloc de CSI au CSI de kossehone Commune de Mokolo CM-CRC EXTREME NORD- 204453-CS-INDV / Elaboration des Etudes de faisabilité techniques et Individual Component A: Local Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 Post Consultant Limited 2,600.00 0.00 development support Implementation 16 21 12 16 02 deConstruction de 01 Selection forage à Zamai, à EP FERDE, à Kosséhone et à Ldendeng Commune de Mokolo CM-CRC EXTREME NORD- 196625-CS-INDV / Suivi Individual contrôle de la fourniture en Component A: Local 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-04- IDA / 57180 Post Consultant Open 1,000.00 0.00 Canceled en Équipement en matériel development support 30 25 27 17 21 22 Selection médicaux au CSI de Takreo yoldeo Commune Kar Hay CM-CRC EXTREME NORD- 196620-CS-INDV / Suivi controle des travaux de Individual Component A: Local 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-04- REALISATION D’UN FORAGE IDA / 57180 Post Consultant Open 1,000.00 0.00 Canceled development support 30 25 27 17 21 22 EQUIPE DE POMPE A Selection MOTRICITE HUMAINE A Dolgaye Commune Kar Hay CM-CRC EXTREME NORD- 222830-CS-INDV / Sélection d'un consultant pour l'élaboration des Individual Etudes de faisabilité Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 Post Consultant Open 3,600.00 0.00 techniques et development support Implementation 08 27 17 22 05 Selection environnementales des MP d'Alimentation en énergie solaire au CMA de de Fotokol Commune de Fotokol (A101201) CM-CRC EXTREME NORD- 222746-CS-INDV / Sélection d'un consultant pour l'élaboration des Individual Etudes de faisabilité Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 Post Consultant Open 3,600.00 0.00 techniques et development support Implementation 08 27 17 22 05 Selection environnementales des MP de construct d’une mini AEP au cma de Logone birni Commune de Logone birni (A101201) CM-CRC EXTREME NORD- 222774-CS-INDV / Sélection d'un consultant pour l'élaboration des Individual Etudes de faisabilité Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 Post Consultant Open 3,000.00 0.00 techniques et development support Implementation 08 27 17 22 05 Selection environnementales des MP d'Alimentation en énergie solaire au cma de Logone birni Commune de Logone birni (A101201) Page 14 CM-CRC EXTREME NORD- 222796-CS-INDV / Sélection d'un consultant pour l'élaboration des Individual Etudes de faisabilité Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 Post Consultant Open 1,300.00 0.00 techniques et development support Implementation 08 27 17 22 05 Selection environnementales des MP construct d’un bloc de 02 salles de classe à EP mokola djavdjaya Commune de Mokolo (A101201) CM-CRC EXTREME NORD- 222805-CS-INDV / Sélection d'un consultant pour l'élaboration des Individual Etudes de faisabilité Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 Post Consultant Open 1,800.00 0.00 techniques et development support Implementation 08 27 17 22 05 Selection environnementales des MP deconstruct de 01 forage À Zamai, à ferdé et Ldendeng Commune de Mokolo (A101201) CM-CRC EXTREME NORD- 222751-CS-INDV / suivi controle des travaux de Individual Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- construct et équipement IDA / 62240 Post Consultant Open 6,095.00 0.00 development support Implementation 08 27 17 22 19 d’une salle d’hospitalisation Selection et d'un bloc opératoire au CMA de Logone birni CM-CRC EXTREME NORD- 222781-CS-INDV / suivi controle des travaux de construct d’1 bloc maternel Individual et latrines à EM Logone Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 Post Consultant Open 5,940.00 0.00 birni et Réhabilitation de 6 development support Implementation 08 27 17 22 19 Selection salles de classe avec bureau attenant et équipement a EP Logone birni GPE 1 A Commune de Logone birni CM-CRC EXTREME NORD- 222801-CS-INDV / suivi controle des travaux de Individual Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2022-01- construct et équipement IDA / 62240 Post Consultant Open 6,095.00 0.00 development support Implementation 08 27 17 22 18 d’une salle d’hospitalisation Selection et d'un bloc opératoire au CMA de Fotokol CM-CRC EXTREME NORD- 222786-CS-INDV / suivi controle des travaux de construct de 4 salles de Individual classe équipées avec 2 Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 Post Consultant Open 9,145.00 0.00 bureau à EP Fotokol et development support Implementation 08 27 17 22 19 Selection construct de 4 salles de classe équipées avec 2 bureau et de 3 blocs de latrines à EP Fotokol Commune de Fotokol CM-CRC EXTREME NORD- 222787-CS-INDV / suivi controle des travaux de construct de deux blocs de deux salles de classe Individual Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- équipées, d'un bloc de deux IDA / 62240 Post Consultant Open 6,505.00 0.00 development support Implementation 08 27 17 22 19 salles de classe équipées Selection avec bureau pour enseignants et d'un bloc latrines a trois compartiments à EP de BIAMO Commune de Makary CM-CRC EXTREME NORD- 222777-CS-INDV / suivi controle des construct de 6 SDC équipées avec bureau et latrines à EP de BIAMO Individual Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- construct de 2 SDC avec IDA / 62240 Post Consultant Open 4,910.00 0.00 development support Implementation 08 27 17 22 19 bureau a EP GRP 2 de BODO, Selection construct de 2 SDC avec bureau et latrines a EP de DJAMOUS Commune de Makary CM-CRC EXTREME NORD- 222823-CS-INDV / suivi controle des travaux de construct d’un forage Individual équipé de pompe à Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- IDA / 62240 Post Consultant Open 2,925.00 0.00 motricité humaine à Mada development support Implementation 08 27 17 22 03 Selection (Ngroh), à Goura 2 (Mosquée), à Labado, à Chou et réhabilitation d’un forage à Mada 1 (quartier Sara) Commune de Makary CM-CRC EXTREME NORD- 222826-CS-INDV / suivi Individual controle des travaux de Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 Post Consultant Open 1,520.00 0.00 construct d’une mini AEP au development support Implementation 08 27 17 22 19 Selection camp des réfugiés d’Afadé Commune de Makary CM-CRC EXTREME NORD- 222762-CS-INDV / suivi Individual controle des travaux de Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-10- IDA / 62240 Post Consultant Open 1,000.00 0.00 construct d’un forage development support Implementation 08 27 17 22 20 Selection équipé de PMH à Tagawa Commune de Waza CM-CRC EXTREME NORD- 222808-CS-INDV / suivi controle des travaux de réalisation d’un forage productif équipé de pompe Individual à motricité humaine dans Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 Post Consultant Open 3,875.00 0.00 les localités de : YEME, development support Implementation 08 27 17 22 19 Selection DANDAYA, KOLDIMA, MADJINA et MEHE EMMA (Camp refugié) dans la Commune de Mora, Département du Mayo Sava. CM-CRC EXTREME NORD- 222824-CS-INDV / suivi controle des de construct d’1 logement d'astreint et Individual d'un mur de cloture à l’EP Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 Post Consultant Open 7,930.00 0.00 IGAWA MEME,et de development support Implementation 08 27 17 22 19 Selection construct de 4 salles de classe équipées avec 1 bureau attenant et de latrines à l’EP de KOTCHEREHE Commune de Mora CM-CRC EXTREME NORD- 222799-CS-INDV / SUIVI CONTROLE DES TRAVAUX DE construct D’UN BLOC DE DEUX SALLES DE CLASSE EQUIPEES AVEC BUREAU ET Individual Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- D’UN BLOC LATRINE A IDA / 62240 Post Consultant Open 7,575.00 0.00 development support Implementation 08 27 17 22 19 TROIS COMPARTIMENTS A Selection L’EPB DE KOSSEHONE, L'EP WANDAI ET L'EP NDROCK DANS LA COMMUNE DE MOKOLO, DEPARTEMENT DU MAYO-TSANAGA. CM-CRC EXTREME NORD- 222768-CS-INDV / Suivi contrôle des travaux de Individual construct de 01 forage à Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 Post Consultant Open 2,685.00 0.00 Zamai, à Ldagodja-Tourou, development support Implementation 08 27 17 22 19 Selection à Ngolkodjala-Kosséhone et à Wandaï-djamboutou Commune de Mokolo CM-CRC EXTREME NORD- 222737-CS-INDV / SUIVI CONTROLE DES TRAVAUX DE construct ET Individual Component A: Local Pending 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- EQUIPEMENT DU CENTRE DE IDA / 62240 Post Consultant Open 6,095.00 0.00 development support Implementation 08 27 17 22 19 SANTE INTEGRE A Selection KOSSEHONE DANS LA COMMUNE DE MOKOLO, DEPARTEMENT DU MAYO- TSANAGA. CM-CRC EXTREME NORD- 222987-CS-INDV / Suivi contrôle des Travaux de Individual Component A: Local Pending 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- Construction de 01 forage IDA / 57180 Post Consultant Open 1,371.00 0.00 development support Implementation 05 23 14 18 17 à énergie solaire au CSI de Selection hile haoussa, dans la commune de kousseri (A2031C1) CM-CRC EXTREME NORD- 228207-CS-INDV / Suivi contrôle des travaux de Individual construction d'un bloc Component A: Local Pending 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- IDA / 62240 Post Consultant Open 1,000.00 0.00 latrines a troix development support Implementation 05 23 14 18 17 Selection compartiement et construction d'un incinerateur au CSI de hile haoussa dans la Commune de kousseri CM-CRC EXTREME NORD- 222755-CS-INDV / suivi controle des travaux de FOURNITURE ET Individual INSTALLATION D’UNE MINI Component A: Local Pending 2021-06- 2021-07- 2021-08- 2021-09- 2022-01- IDA / 62240 Post Consultant Open 2,275.00 0.00 CENTRALE SOLAIRE AU CSI development support Implementation 01 20 10 14 12 Selection DE KOSSA, DANS LA COMMUNE DE MORA, DEPARTEMENT DU MAYO- SAVA, REGION DE L’EXTREME – NORD. Page 15 PROCUREMENT PLAN (Textual Part) Project information: [Sudan] [Sudan Family Support Program] (SFSP) (P173521) Project Implementation agency: [Ministry of Finance & Economic Planning/ PIU] Date of the Procurement Plan: [31/08/2020] Period covered by this Procurement Plan: [18 Month] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [Sudan procurement contracting and disposal of assets law 2010], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. [Applicable as provide in section 5 paragraph 5.3 to 5.6 of procurement REGULATION for IPF Borrowers] When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable is for those contracts identified in the Procurement Plan tables]; Works: [is not applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. [N/A] PROCUREMENT Sudan : Sudan Family Support Project PLAN General Information Country: Sudan Bank’s Approval Date of the Original Procurement Plan: 2020-11-22 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173521 GPN Date: Project Name: Sudan Family Support Project Loan / Credit No: IDA / D7350 Ministry of Finance and Economic Planning Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SD-MOWSS-202443-GO-RFQ Component 2: Establish Pending Request for Single Stage - One / ICT Hardware / USSD IDA / D7350 Delivery Systems and Build Post Limited 190,000.00 0.00 Implementati 2020-11-06 2021-01-01 2021-06-30 Quotations Envelope Gateway Institutional Capacity on SD-MOWSS-202446-GO-RFQ Component 2: Establish Pending Request for Single Stage - One / Laptops for physical IDA / D7350 Delivery Systems and Build Post Limited 125,000.00 0.00 Implementati 2020-11-06 2021-01-01 2021-06-30 Quotations Envelope Registration Institutional Capacity on SD-MOWSS-202448-GO-RFQ Component 2: Establish Pending Request for Single Stage - One / Tablets for physical IDA / D7350 Delivery Systems and Build Post Limited 60,000.00 0.00 Implementati 2020-11-06 2021-01-01 2021-06-30 Quotations Envelope registration Institutional Capacity on SD-MOWSS-202449-GO-RFQ Component 2: Establish Pending Request for Single Stage - One / Rent bandwidth for USSD IDA / D7350 Delivery Systems and Build Post Limited 3,000.00 0.00 Implementati 2020-11-06 2021-01-01 2021-06-30 Quotations Envelope (three Telcos) Institutional Capacity on Component 2: Establish Pending SD-MOWSS-202639-GO-RFQ Request for Single Stage - One IDA / D7350 Delivery Systems and Build Post Limited 10,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 / CRM Software Quotations Envelope Institutional Capacity on SD-MOWSS-202640-GO-RFQ Component 2: Establish Pending Request for Single Stage - One / Vehicle for Mobile IDA / D7350 Delivery Systems and Build Post Limited 1,375,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 Quotations Envelope registration Institutional Capacity on SD-MOWSS-202642-GO-RFQ Component 2: Establish Pending Request for Single Stage - One / Satellite Communication for IDA / D7350 Delivery Systems and Build Post Open - International 125,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 Quotations Envelope registration vehicles Institutional Capacity on Component 2: Establish Under SD-MOFEP-235901-GO-RFB Single Stage - One IDA / D7350 Delivery Systems and Build Post Request for Bids Open - National 750,000.00 0.00 Implementati 2021-05-24 2021-05-30 2021-05-30 2021-07-15 2021-07-21 2021-07-29 2021-08-15 / Supply of Tablets Envelope Institutional Capacity on Component 2: Establish Pending SD-MOFEP-236095-GO-RFQ Request for Single Stage - One IDA / D7350 Delivery Systems and Build Post Limited 100,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 / Supply of tablets Quotations Envelope Institutional Capacity on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Project Pending SD-MOWSS-202694-NC-RFQ Request for Single Stage - One IDA / D7350 Management, Monitoring and Post Limited 11,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 / Office furniture Quotations Envelope Evaluation, and Learning on Component 3: Project Pending SD-MOWSS-202703-NC-RFQ Request for Single Stage - One IDA / D7350 Management, Monitoring and Post Limited 5,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 / Software Packages Quotations Envelope Evaluation, and Learning on Component 2: Establish Pending SD-MOWSS-202704-NC-RFQ Request for Single Stage - One IDA / D7350 Delivery Systems and Build Post Limited 10,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 / Cell Phone Quotations Envelope Institutional Capacity on Component 2: Establish Pending SD-MOWSS-202705-NC-RFQ Request for Single Stage - One IDA / D7350 Delivery Systems and Build Post Limited 3,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 / Stationery Quotations Envelope Institutional Capacity on Component 2: Establish Pending SD-MOWSS-202707-NC-RFQ Request for Single Stage - One IDA / D7350 Delivery Systems and Build Post Limited 14,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 / monitors/docking stations Quotations Envelope Institutional Capacity on Component 2: Establish Pending SD-MOWSS-202708-NC-RFQ Request for Single Stage - One IDA / D7350 Delivery Systems and Build Post Limited 20,000.00 0.00 Implementati 2020-11-09 2021-01-04 2021-07-03 / Vehicle rent for Sr staff Quotations Envelope Institutional Capacity on SD-MOFEP-207302-NC-RFQ Component 2: Establish Pending Request for Single Stage - One / Data Protection Authority / IDA / D7350 Delivery Systems and Build Post Limited 300,000.00 0.00 Implementati 2020-12-06 2021-01-31 2021-07-30 Quotations Envelope Institutional arrangments Institutional Capacity on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Component 2: Establish SD-MOWSS-202671-CS- Quality And Cost- Pending IDA / D7350 Delivery Systems and Build Post Open - International 250,000.00 0.00 2020-11-04 2020-11-25 2021-01-08 2021-02-05 2021-03-07 2021-04-11 2021-05-16 2022-05-16 QCBS / Reconciliation Audit Based Selection Implementation Institutional Capacity SD-MOWSS-202673-CS- Component 2: Establish QCBS / Payment Services Quality And Cost- Pending IDA / D7350 Delivery Systems and Build Post Open - International 150,000.00 0.00 2020-11-04 2020-11-25 2021-01-08 2021-02-05 2021-03-07 2021-04-11 2021-05-16 2022-05-16 Providers (MNOs, Banks, Based Selection Implementation Institutional Capacity Other) SD-MOWSS-202679-CS- Component 2: Establish Quality And Cost- Pending QCBS / MIS Development IDA / D7350 Delivery Systems and Build Post Open - International 200,000.00 0.00 2020-11-04 2020-11-25 2021-01-08 2021-02-05 2021-03-07 2021-04-11 2021-05-16 2022-05-16 Based Selection Implementation (Firm) Institutional Capacity Component 2: Establish SD-MOWSS-202680-CS- Quality And Cost- Pending IDA / D7350 Delivery Systems and Build Post Open - International 15,000.00 0.00 2020-11-04 2020-11-25 2021-01-08 2021-02-05 2021-03-07 2021-04-11 2021-05-16 2022-05-16 QCBS / MEL Framework (Firm) Based Selection Implementation Institutional Capacity SD-MOWSS-202681-CS- Component 2: Establish Quality And Cost- Pending QCBS / Media Content IDA / D7350 Delivery Systems and Build Post Open - National 15,000.00 0.00 2020-11-04 2020-11-25 2021-01-08 2021-02-05 2021-03-07 2021-04-11 2021-05-16 2022-05-16 Based Selection Implementation Creation Institutional Capacity Component 2: Establish SD-MOWSS-202682-CS- Quality And Cost- Pending IDA / D7350 Delivery Systems and Build Post Open - National 15,000.00 0.00 2020-11-04 2020-11-25 2021-01-08 2021-02-05 2021-03-07 2021-04-11 2021-05-16 2022-05-16 QCBS / Media Punchers Based Selection Implementation Institutional Capacity INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SD-MOWSS-201613-CS-CQS Component 3: Project Individual Under / ENROLLMENT MA / IDA / D7350 Management, Monitoring and Post Consultant Open 12,000.00 0.00 2020-11-02 2021-02-22 2020-12-21 2021-01-11 2021-02-15 2021-08-14 Implementation Enrolment Manager Evaluation, and Learning Selection Component 3: Project Individual SD-MOWSS-202658-CS- Under IDA / D7350 Management, Monitoring and Post Consultant Open 12,000.00 0.00 2020-11-02 2021-02-22 2020-12-21 2021-01-11 2021-02-15 2021-08-14 INDV / Payment Manager Implementation Evaluation, and Learning Selection Component 3: Project Individual SD-MOWSS-202659-CS- Under IDA / D7350 Management, Monitoring and Post Consultant Open 12,000.00 0.00 2020-11-02 2021-02-22 2020-12-21 2021-01-11 2021-02-15 2021-08-14 INDV / Information Security Implementation Evaluation, and Learning Selection SD-MOWSS-202657-CS- Component 3: Project Individual INDV / Communication IDA / D7350 Management, Monitoring and Prior Consultant Open 12,000.00 0.00 Under Review 2020-11-02 2020-12-21 2021-01-11 2021-02-15 2021-08-14 Manager Evaluation, and Learning Selection Component 3: Project Individual SD-MOWSS-202663-CS- Under IDA / D7350 Management, Monitoring and Post Consultant Limited 40,000.00 0.00 2020-11-04 2021-02-22 2020-11-09 2020-11-30 2021-01-04 2021-07-03 INDV / Program Manager Implementation Evaluation, and Learning Selection Component 3: Project Individual SD-MOWSS-202660-CS- Pending IDA / D7350 Management, Monitoring and Post Consultant Open 12,000.00 0.00 2020-11-02 2020-12-21 2021-01-11 2021-02-15 2021-08-14 INDV / MIS Manager Implementation Evaluation, and Learning Selection Component 3: Project Individual SD-MOWSS-202661-CS- Under IDA / D7350 Management, Monitoring and Post Consultant Open 12,000.00 0.00 2020-11-02 2021-02-22 2020-12-21 2021-01-11 2021-02-15 2021-08-14 INDV / MEL Manager Implementation Evaluation, and Learning Selection SD-MOWSS-202664-CS- Component 3: Project Individual Pending INDV / Database IDA / D7350 Management, Monitoring and Post Consultant Limited 18,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Administrator Evaluation, and Learning Selection SD-MOWSS-202666-CS- Component 3: Project Individual Pending INDV / Network IDA / D7350 Management, Monitoring and Post Consultant Limited 18,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Administration Evaluation, and Learning Selection SD-MOWSS-202667-CS- Component 3: Project Individual Pending INDV / Family Enrolment Lead IDA / D7350 Management, Monitoring and Post Consultant Limited 18,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Officer Evaluation, and Learning Selection SD-MOWSS-202668-CS- Component 3: Project Individual Pending INDV / Registration Focal IDA / D7350 Management, Monitoring and Post Consultant Limited 18,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Points per State Evaluation, and Learning Selection Component 3: Project Individual SD-MOWSS-202649-CS- Pending IDA / D7350 Management, Monitoring and Post Consultant Limited 18,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 INDV / Payments Officer Implementation Evaluation, and Learning Selection SD-MOWSS-202651-CS- Component 3: Project Individual Pending INDV / Grievance Redress IDA / D7350 Management, Monitoring and Post Consultant Limited 12,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Officer Evaluation, and Learning Selection SD-MOWSS-202652-CS- Component 3: Project Individual Pending INDV / Privacy and Digital IDA / D7350 Management, Monitoring and Post Consultant Limited 21,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Ethics Officer Evaluation, and Learning Selection SD-MOWSS-202653-CS- Component 3: Project Individual Pending INDV / Civil Society and IDA / D7350 Management, Monitoring and Post Consultant Limited 21,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Community Outreach Officer Evaluation, and Learning Selection SD-MOWSS-202655-CS- Component 3: Project Individual Pending INDV / State-level IDA / D7350 Management, Monitoring and Post Consultant Limited 12,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Communication Coordinator Evaluation, and Learning Selection SD-MOWSS-202656-CS- Component 3: Project Individual Pending INDV / Gender / Social Impact IDA / D7350 Management, Monitoring and Post Consultant Limited 12,000.00 0.00 2020-11-04 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Specialist Evaluation, and Learning Selection SD-MOWSS-202670-CS- Component 3: Project Individual Under INDV / Project Procurement IDA / D7350 Management, Monitoring and Prior Consultant Limited 21,000.00 0.00 2020-11-04 2021-02-22 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation Specialist Evaluation, and Learning Selection Page 2 Component 3: Project SD-MOFEP-236088-CS-CDS Pending IDA / D7350 Management, Monitoring and Post Direct Selection Direct 42,000.00 0.00 2021-06-15 2021-06-25 2021-08-29 2022-02-25 / Hiring of Legal advisor Implementation Evaluation, and Learning SD-MOFEP-236097-CS-INDV Component 3: Project Individual Pending / Digital Channel Enrollment IDA / D7350 Management, Monitoring and Post Consultant Limited 30,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 Implementation Officer Evaluation, and Learning Selection SD-MOFEP-236104-CS-INDV Component 3: Project Individual Pending / Family Enrollment Team IDA / D7350 Management, Monitoring and Post Consultant Limited 30,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 Implementation leader Evaluation, and Learning Selection Component 3: Project Individual SD-MOFEP-236106-CS-INDV Pending IDA / D7350 Management, Monitoring and Post Consultant Limited 30,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 / Business Analyst Implementation Evaluation, and Learning Selection Component 3: Project Individual SD-MOFEP-236111-CS-INDV Pending IDA / D7350 Management, Monitoring and Post Consultant Limited 30,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 / hiring of Payment Officer Implementation Evaluation, and Learning Selection SD-MOFEP-236113-CS-INDV Component 3: Project Individual Pending / hiring of Social Media IDA / D7350 Management, Monitoring and Post Consultant Limited 30,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 Implementation Associate Evaluation, and Learning Selection Page 3 PROCUREMENT PLAN (Textual Part) Project information: SUDAN EDUCATION COVID-19 RESPONSE Sudan, (SECEP) P174220 Project Implementation agency: Federal Ministry of Education Date of the Procurement Plan: May 2020 Period covered by this Procurement Plan: [May 2020 –Feb 2021] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [ Not applicable], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not applicable Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. The project will implement procurement of goods that will contribute to project’s objective, through the Alternative Procurement Arrangements (APA) where the recipient is a 3rd party e.g. a UN Agency. To expedite, prioritize 3rd parties with whom the Bank already has APA arrangements to minimize time required for the APA assessments. Agencies with existing APA arrangements include WHO, UNICEF, FAO, UNOPS, WFP, UNDP and ICRC. PROCUREMENT Sudan : Sudan Education COVID-19 Response PLAN General Information Country: Sudan Bank’s Approval Date of the Original Procurement Plan: 2021-05-30 2021-05-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174220 GPN Date: Project Name: Sudan Education COVID-19 Response Loan / Credit No: TF / B3339 Ministry of Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SD-MOE-210604-GO-RFQ / Supporting safe transition Pending Printing and distribution of Request for Single Stage - One TF / B3339 back to school during Post Open - National 1,300,000.00 0.00 Implementati 2021-01-20 2021-02-03 2021-02-28 assignments for Basic School Quotations Envelope recovery on Students SD-MOE-210623-GO-DIR / Pending Program coordination and Procurement Ready Made TF / B3339 Post Direct Selection Direct 50,000.00 0.00 Implementati 2020-12-25 2020-12-30 2021-02-03 2021-08-02 management Accounting Software for PCU on SD-MOE-210624-GO-RFQ / Pending Program coordination and Request for Single Stage - One Procurement of laptops for TF / B3339 Post Open - National 30,000.00 0.00 Implementati 2020-12-30 2021-02-24 2021-08-23 management Quotations Envelope PCU on SD-MOE-210625-GO-RFQ / Pending Procurement of photocopier Program coordination and Request for Single Stage - One TF / B3339 Post Open - National 32,000.00 0.00 Implementati 2021-01-04 2021-03-01 2021-08-28 for PCU management Quotations Envelope on Office Equipment SD-MOE-210626-GO-UN / Pending Procurement of Vehicles for Program coordination and UN Agencies TF / B3339 Post Direct 120,000.00 0.00 Implementati 2020-12-30 2021-01-04 2021-02-08 2021-08-07 states (four Pick-Up double management (Direct) on cabin) SD-MOE-210627-GO-RFQ / Pending Program coordination and Request for Single Stage - One Procurement of Audiovisuals TF / B3339 Post Open - National 50,000.00 0.00 Implementati 2021-01-20 2021-03-17 2021-09-13 management Quotations Envelope tools for distant learning on Supporting learning SD-MOE-210609-GO-UN / continuity at the basic Pending Procurement of (100,000) Single Stage - Two TF / B3339 education level during the Prior Request for Bids Open - National 2,000,000.00 0.00 Implementati 2021-06-15 2021-06-20 2021-07-04 2021-07-20 2021-09-30 Solar FM/AM/SW portable Envelope COVID-19 pandemic and on radios school system shutdown SD-MOE-210605-GO-RFQ / Supporting safe transition Pending Request for Single Stage - One Provision of 1,760 storage TF / B3339 back to school during Post Open - National 880,000.00 0.00 Implementati 2021-06-06 2021-07-13 2021-08-09 Quotations Envelope Water tanks to schools recovery on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Supporting learning SD-MOE-210599-NC-RFP / continuity at the basic Pending Request for Single Stage - Two General broadcasting (COVID- TF / B3339 education level during the Post Limited 400,000.00 0.00 Implementati 2020-12-20 2021-01-12 2021-01-19 2021-01-26 2021-03-17 2022-09-08 Proposals Envelope 19 awareness, WASH) COVID-19 pandemic and on school system shutdown Supporting learning SD-MOE-210603-NC-RFP / continuity at the basic Pending Request for Improving of education TF / B3339 education level during the Post Limited 700,000.00 0.00 Implementati 2021-01-05 2021-02-21 2021-02-21 2021-02-28 2021-04-06 2022-05-05 Proposals quality in Math and reading COVID-19 pandemic and on school system shutdown CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SD-MOE-210611-CS-CQS / Consultant Program coordination and Pending Hiring of PCU Financial TF / B3339 Post Qualification Open - National 24,000.00 0.00 2020-12-25 2021-01-15 2021-02-28 2021-03-30 2021-05-04 2021-10-31 management Implementation Management Officer Selection Consultant SD-MOE-210618-CS-CQS / Program coordination and Pending TF / B3339 Post Qualification Open - National 36,000.00 0.00 2020-12-25 2021-01-15 2021-02-28 2021-03-30 2021-05-04 2021-10-31 Hiring of PCU M&E Specialist management Implementation Selection Consultant SD-MOE-210619-CS-CQS / Program coordination and Pending TF / B3339 Post Qualification Open - National 36,000.00 0.00 2020-12-25 2021-01-15 2021-02-28 2021-03-30 2021-05-04 2021-10-31 Hiring of PCU Data Specialist management Implementation Selection SD-MOE-210620-CS-CQS / Consultant Program coordination and Pending Hiring of PCU Assistant Data TF / B3339 Post Qualification Open - National 24,000.00 0.00 2020-12-25 2021-01-15 2021-02-28 2021-03-30 2021-05-04 2021-10-31 management Implementation Specialist Selection Consultant SD-MOE-210621-CS-CQS / Program coordination and Pending TF / B3339 Post Qualification Open - National 24,000.00 0.00 2020-12-25 2021-01-15 2021-02-28 2021-03-30 2021-05-04 2021-10-31 Hiring of PCU ICT Officer management Implementation Selection Page 1 SD-MOE-210622-CS-CQS / Consultant Program coordination and Pending Hiring of PCU communication TF / B3339 Post Qualification Open - National 24,000.00 0.00 2020-12-25 2021-01-15 2021-02-28 2021-03-30 2021-05-04 2021-10-31 management Implementation officer Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN (Textual Part) Project information: DRC - Regional Great Lakes Integrated Development Project (P-143307) Project Implementation agency: Ministry of Agriculture Date of the Procurement Plan: April 18, 2017 Period covered by this Procurement Plan: July2014 – July 31, 2017 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: Request for quotations; Works: Not Applicable Other Relevant Procurement Information. PROCUREMENT Eastern Africa : AFR RI-Regional Great Lakes Integrated Agriculture Development Project PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-04-18 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P143307 GPN Date: 2018-11-02 Project Name: AFR RI-Regional Great Lakes Integrated Agriculture Development Project Loan / Credit No: IDA / Q9260, IDA / 58520, IDA / Q9610 Ministry of Agriculture Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ZR-MINAGRI-79144-CW- RFB / Travaux de Support Services and Project Single Stage - One 2018-10- 2019-01- 2018-10- 2019-07- 2018-11- 2019-02- 2018-12- 2019-03- 2019-01- 2019-08- 2019-07- IDA / 58520 Prior Request for Bids Open - National 500,000.00 656,215.93 Signed réhabilitation des bâtiments Management Envelope 03 11 08 13 19 22 19 29 23 09 22 des inspestions provinciales de Sud Kivu ZR-MINAGRI-78946-CW- RFB / Travaux de Support Services and Project Single Stage - One 2018-10- 2019-01- 2018-10- 2018-11- 2019-02- 2018-12- 2019-03- 2019-01- 2019-06- 2019-07- IDA / 58520 Post Request for Bids Open - National 500,000.00 486,607.72 Signed réhabilitation des bâtiments Management Envelope 03 11 08 19 22 19 21 23 24 22 des inspestions provinciales de Tanganyika ZR-MINAGRI-79093-CW- RFQ / Travaux de réhabilitation des bâtiments devant servir des bureaux du Support Services and Project Request for Single Stage - One 2018-10- 2019-02- 2018-12- 2019-05- 2019-06- IDA / 58520 Post Limited 80,000.00 79,437.21 Signed Ministre Provincial de Management Quotations Envelope 08 02 03 16 01 l'Agriculture,Pêche et Elevage et du Développement Rural du Tanganyika ZR-MINAGRI-105397-CW- RFQ / Travaux de Réhabilitation des bâtiments Support Services and Project Request for Single Stage - One 2019-05- 2019-10- 2019-07- 2019-12- 2020-01- abritant le Bureau_ du IDA / 58520 Post Limited 30,000.00 24,227.50 Signed Management Quotations Envelope 15 09 10 09 06 Ministère provincial de l’Agriculture, pèche et élevage du Sud-Kivu ZR-MINAGRI-133733-CW- RFQ / Travaux de Pending réhabilitation du bâtiment Support Services and Project Request for Single Stage - One 2019-10- 2019-12- 2020-06- IDA / 58520 Post Limited 40,000.00 0.00 Implementa devant servir des bureaux Management Quotations Envelope 20 15 12 tion provisoires de l'IPAPEL Sud Kivu ZR-MINAGRI-169983-CW- RFQ / Travaux d'aménagement du bâtiment Pending Support Services and Project Request for Single Stage - One 2020-08- 2020-09- 2021-03- abritant les bureaux des IDA / 58520 Post Limited 80,000.00 0.00 Implementa Management Quotations Envelope 04 29 28 services du Secrétariat tion Général à la Pêche et Elevage sur l'avenue de la libération (SQUAV) ZR-MINAGRI-169808-CW- DIR / Contractualisation avec SAGEC KAT pour les travaux de construction des bureaux Support for the development Pending 2020-07- 2020-08- 2020-09- 2021-03- complémentaires des des IDA / 58520 of the private agro- Post Direct Selection Direct 145,000.00 0.00 Implementa 30 04 08 07 inspections de l'Agriculture industrial sector tion et du Développement Rural de la province de Tanganyika et aménagement extérieur ZR-MINAGRI-169820-CW- RFQ / Travaux de Pending Support Services and Project Request for Single Stage - One 2020-05- 2020-07- 2021-01- construction de deux (2) IDA / 58520 Post Limited 200,000.00 0.00 Implementa Management Quotations Envelope 20 15 11 laboratoires du SENASEM et tion de l'INERA Tanganyika ZR-MINAGRI-169811-CW- DIR / Contractualisation avec KIMA CONSTRUCTION pour Under la réalisation des travaux de Support Services and Project 2020-06- 2020-10- 2020-06- 2020-10- 2020-08- 2021-01- IDA / 58520 Post Direct Selection Direct 25,000.00 25,377.38 Implementa la clôture et d'aménagement Management 22 07 27 12 01 28 tion extérieur des bureaux du Ministre Provincial de l'Agriculture Sud Kivu ZR-MINAGRI-188529-CW- RFQ / Travaux de construction de six (06) Pending Agriculture Value Chain Request for Single Stage - One 2020-10- 2020-12- 2021-05- Centres Communautaires de IDA / 58520 Post Limited 200,000.00 0.00 Implementa Development Quotations Envelope 07 02 31 Transformation de Riz tion (CCTRIZ) dans la Province de Tanganyika ZR-MINAGRI-188543-CW- RFQ / Travaux de construction de Entrepôts Pending Agriculture Value Chain Request for Single Stage - One 2020-11- 2020-12- 2021-06- dépôts de stockage à IDA / 58520 Post Limited 200,000.00 0.00 Implementa Development Quotations Envelope 05 31 29 Rugumba, Rugo, Lwaminwa, tion Katibili, Muhala et Kabimba dans la Province du Tanganyika ZR-MINAGRI-188540-CW- RFQ / Travaux de construction de 6 dépôts de Pending Agriculture Value Chain Request for Single Stage - One 2020-09- 2020-11- 2021-04- stockage à Rugumba, Rugo, IDA / 58520 Post Limited 150,000.00 0.00 Implementa Development Quotations Envelope 06 01 30 Lwaminwa, Katibili, Muhala tion et Kabimba dans la Province du Tanganyika ZR-MINAGRI-188521-CW- RFQ / Travaux de construction de deux (02) dépôts vétérinaires dans la Pending Agriculture Value Chain Request for Single Stage - One 2020-10- 2020-12- 2021-06- ville de Kalemie et deux (02) IDA / Q9610 Post Limited 150,000.00 0.00 Implementa Development Quotations Envelope 27 22 20 cliniques vétérinaires dans tion les bassins de production de la Rugumba et Lwamina, territoire de Kalemie/Tanganyika ZR-MINAGRI-188479-CW- DIR / Contractualisation avec l'Entreprise SAGEC KAT SARL pour les travaux complémentaires de Support Services and Project 2020-09- 2020-10- 2020-09- 2020-10- 2020-10- 2020-11- 2021-04- Réhabilitation du bâtiment IDA / 58520 Post Direct Selection Direct 150,000.00 149,428.76 Signed Management 16 07 21 12 26 23 24 devant servir des bureaux des Inspections Provinciales de l’Agriculture et du Développement Rural du Sud Kivu ZR-MINAGRI-188497-CW- RFQ / Travaux de construction du laboratoire Pending Agriculture Value Chain Request for Single Stage - One 2020-10- 2020-12- 2021-06- de la Coordination IDA / 58520 Post Limited 170,000.00 0.00 Implementa Development Quotations Envelope 23 18 16 Provinciale de Service tion National de Semences (SENASEM)/Tanganyika ZR-MINAGRI-188489-CW- RFQ / Travaux de Pending Agriculture Value Chain Request for Single Stage - One 2020-10- 2020-12- 2021-06- construction des Unités de IDA / 58520 Post Limited 200,000.00 0.00 Implementa Development Quotations Envelope 26 21 19 transformation du lait dans tion territoire de Kalemie/Tanganyika ZR-MINAGRI-188545-CW- RFQ / Travaux de constuction de dix Centres (Bâtiments) Communautaires Agriculture Value Chain Request for Single Stage - One 2020-10- 2020-12- 2021-05- de Transformation de Maïs IDA / 58520 Post Limited 230,000.00 0.00 Canceled Development Quotations Envelope 06 01 30 dont 2 à Kabimba, 2 à Rugo, 2 à Rugumba, 2 à Katibili et 2 à Lwamminwa dans la Province de Tanganyika ZR-MINAGRI-210011-GO- RFQ / Travaux de Pending construction de deux (2) mini Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 20,000.00 0.00 Implementa chambres froides dont 1 à Development Quotations Envelope 13 10 07 tion Luberezi et 1 Mutarule, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210021-CW- RFQ / Construction de deux (2) mini laboratoires de Service National de Semences (SENASEM) dont 1 à Bwegera Pending Support Services and Project Request for Single Stage - One 2021-01- 2021-03- 2021-09- et 1 Fizi centre, d’un (1) mur IDA / 58520 Post Limited 123,000.00 0.00 Implementa Management Quotations Envelope 30 27 23 de clôture et aménagement tion des paillasses dans la salle de labo physique et phytopathologie aux bureaux de SENASEM Bukavu ZR-MINAGRI-210108-CW- RFQ / Travaux de construction de deux (02) Pending Agriculture Value Chain Request for Single Stage - One 2021-01- 2021-03- 2021-09- provenderies dans les IDA / 58520 Post Limited 65,000.00 0.00 Implementa Development Quotations Envelope 20 17 13 Bassins de production de tion Rugumba et Lwaminwa dans la Province de Tanganyika ZR-MINAGRI-210111-CW- RFQ / Travaux de construction de quatre (04) Pending boutiques d'intrants Agriculture Value Chain Request for Single Stage - One 2021-01- 2021-03- 2021-09- IDA / 58520 Post Limited 128,000.00 0.00 Implementa agricoles dans les Bassins de Development Quotations Envelope 25 22 18 tion production de Rugumba, Kabimba, Kalemie et Kamango dans la Province de Tanganyika Page 1 ZR-MINAGRI-210125-CW- RFQ / Travaux de construction de quatre (4) Centres de Collecte et Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- Transformation de Manioc IDA / 58520 Post Limited 153,000.00 0.00 Implementa Development Quotations Envelope 01 29 25 dont 2 à Bitale, 1 à Bulmbika tion et 1 à Mulonge, dans le territoire de Kalehe, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210132-CW- RFQ / Travaux de construction de quatre (4) Centres de Collecte et Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- Transformation de Manioc IDA / 58520 Post Limited 153,000.00 0.00 Implementa Development Quotations Envelope 01 29 25 dont 1 à Mubuku, 1 à Karasi, tion 1 à Kitchanga et 1 à Maibano, dans le territoire de Kalehe, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210126-CW- RFQ / Travaux de construction de deux (2) Pending Centres de Collecte et Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- IDA / 58520 Post Limited 77,000.00 0.00 Implementa Transformation de Manioc Development Quotations Envelope 01 29 25 tion dont 1 à Katanga et 1 à Malinde, dans le territoire de Fizi, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210127-CW- RFQ / Travaux de construction de cinq (5) Pending Centres de Collecte et Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- IDA / 58520 Post Limited 192,000.00 0.00 Implementa Transformation de Manioc Development Quotations Envelope 01 29 25 tion dont 3 à Katana, 1 à Kavumu et 1 à Luhihi, dans le territoire de Kabare, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210129-CW- RFQ / Travaux de construction de trois (3) Centres de Collecte et Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- Transformation de Manioc IDA / 58520 Post Limited 115,000.00 0.00 Implementa Development Quotations Envelope 01 29 25 dont 1 à Sange, 1 à Kiliba et tion 1 à Runingu, dans le territoire d’Uvira, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210130-CW- RFQ / Travaux de construction de quatre (4) Centres de Collecte et Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- Transformation de Manioc IDA / 58520 Post Limited 153,000.00 0.00 Implementa Development Quotations Envelope 01 29 25 dont 2 à Kamanyola, 1 à tion Luvungi et 1 à Lubarika, dans la plaine de Ruzizi, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-195187-CW- Pending RFQ / Travaux de Agriculture Value Chain Request for Single Stage - One 2021-01- 2021-03- 2021-08- IDA / 58520 Post Limited 160,000.00 0.00 Implementa construction du laboratoire Development Quotations Envelope 04 01 28 tion de l'INERA dans le territoire de Kalemie ZR-MINAGRI-210336-CW- RFQ / Construction des aires de sechage semi ouverts Pending dans le groupement de Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 41,000.00 0.00 Implementa Bushumba dans le territoire Development Quotations Envelope 08 05 02 tion de Kabare et le groupement d'Itara dans le territoire d'Uvira, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210338-CW- RFQ / Construction des aires Pending de sechage non couverts à Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 18,000.00 0.00 Implementa Sebele dans le territoire de Development Quotations Envelope 08 05 02 tion Fizi et à Uvira, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210648-CW- RFQ / Travaux de construction de sept (7) abris dont six (6) pour mini- Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- minoterie et un (1) pour mini- IDA / 58520 Post Limited 84,000.00 0.00 Implementa Development Quotations Envelope 03 31 27 laiterie de type 2, et d’une tion (1) provenderie, dans le territoire de Kabare, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210650-CW- RFQ / Travaux de construction de quatre (4) Pending abris dont un (1) pour mini- Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- IDA / Q9260 Post Limited 42,000.00 0.00 Implementa minoterie et trois (3) pour Development Quotations Envelope 03 31 27 tion mini-laiterie de type 2, dans le territoire de Kalehe, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210651-CW- RFQ / Travaux de construction de dix (10) abris dont huit (8) pour mini- Pending minoterie, un (1) pour rizerie Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- IDA / 58520 Post Limited 110,000.00 0.00 Implementa de type 2 (SB-50 ou Development Quotations Envelope 03 31 27 tion équivalent) et un (1) pour mini-laiterie de type 2, dans le territoire de Fizi, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210653-CW- RFQ / Travaux de construction de deux (2) Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- abris pour mini-laiterie de IDA / 58520 Post Limited 34,000.00 0.00 Implementa Development Quotations Envelope 03 31 27 type 2 et une (1) tion provenderie, à Bukavu, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210654-CW- RFQ / Travaux de construction de seize (16) abris dont douze (12) pour Pending mini minoterie, trois (3) pour Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- IDA / 58520 Post Limited 174,000.00 0.00 Implementa rizerie type 2 (SB-50 ou Development Quotations Envelope 03 31 27 tion équivalent), un (1) pour mini- laiterie de type 2 et d’une (1) provenderie dans la plaine de Ruzizi (Territoires d’Uvira et Walungu) ZR-MINAGRI-210656-CW- RFQ / Travaux de construction de quatorze (14) abris dont cinq (5) pour Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-03- 2021-09- mini-minoterie, deux (2) IDA / 58520 Post Limited 141,000.00 0.00 Implementa Development Quotations Envelope 03 31 27 pour rizerie de type 2, un (1) tion pour entrepot des intrants agricoles et six (6) pour mini- laiterie de type 2, dans le territoire d’Uvira ZR-MINAGRI-210894-CW- RFQ / Travaux de construction de trois (3) entrepôts des produits Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- agricoles avec bureaux des IDA / 58520 Post Limited 171,000.00 0.00 Implementa Development Quotations Envelope 10 07 04 préposés et latrines et d’un tion (1) entrepôt semencier à Katanga, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210893-CW- RFQ / Travaux de construction de trois (3) entrepôts des produits Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- agricoles avec bureaux des IDA / 58520 Post Limited 171,000.00 0.00 Implementa Development Quotations Envelope 10 07 04 préposés et latrines à Baraka tion et d’un (1) entrepôt semencier à Nemba, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210891-CW- RFQ / Travaux de construction de trois (3) entrepôts des produits Pending agricoles avec bureaux des Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 171,000.00 0.00 Implementa préposés et latrines dont 1 à Development Quotations Envelope 10 07 04 tion Sebele, 1 à Kabondonzi et 1 à Malinde et d’un (1) entrepôt semencier à Sebele, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210886-CW- RFQ / Travaux de construction de quatre (4) entrepôts des produits Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- agricoles avec bureaux des IDA / 58520 Post Limited 187,000.00 0.00 Implementa Development Quotations Envelope 10 07 04 préposés et latrines dont tion deux (2) à Fizi centre et deux (2) à Mulongwe, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210885-CW- RFQ / Travaux de construction de trois (3) entrepôts des produits Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- agricoles avec bureaux des IDA / 58520 Post Limited 200,000.00 0.00 Implementa Development Quotations Envelope 10 07 04 préposés et latrines et de tion deux (2) entrepôts semenciers à Sange, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210892-CW- RFQ / Travaux de construction de trois (3) entrepôts des produits Pending agricoles avec bureaux des Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 171,000.00 0.00 Implementa préposés et latrines dont un Development Quotations Envelope 10 07 04 tion (1) à Kiliba et deux (2) à Runingu, et d’un (1) entrepôt semencier à Kiliba, dans le cadre du PICAGL, UPEP Sud- Kivu Page 2 ZR-MINAGRI-210890-CW- RFQ / Travaux de construction de quatre (4) entrepôts des produits Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- agricoles avec bureaux des IDA / 58520 Post Limited 187,000.00 0.00 Implementa Development Quotations Envelope 10 07 04 préposés et latrines dont tion trois (3) à Luvungi et un (1) à Lubarika, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210887-CW- RFQ / Travaux de construction de quatre (4) entrepôts des produits Pending agricoles avec bureaux des Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 187,000.00 0.00 Implementa préposés et latrines dont un Development Quotations Envelope 10 07 04 tion (1) à Kagando, un (1) à Kahwizi, un (1) à Kigongo et un (1) à Murunga, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210884-CW- RFQ / Travaux de construction de deux (2) entrepôts des produits Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- agricoles avec bureaux des IDA / 58520 Post Limited 124,000.00 0.00 Implementa Development Quotations Envelope 10 07 04 préposés et latrines et d’un tion (1) entrepôt semencier à Nyangezi, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210888-CW- RFQ / Travaux de construction de trois (3) Pending entrepôts des produits Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 140,000.00 0.00 Implementa agricoles avec bureaux des Development Quotations Envelope 10 07 04 tion préposés et latrines à Kamanyola, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210889-CW- RFQ / Travaux de construction de deux (2) entrepôts des produits Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- agricoles avec bureaux des IDA / 58520 Post Limited 95,000.00 0.00 Implementa Development Quotations Envelope 10 07 04 préposés et latrines dont un tion (1) à Mudaka et un (1) à Bunyakiri/Bitale, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210974-CW- RFQ / Travaux de Pending construction d’une (1) laiterie Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-09- IDA / 58520 Post Limited 32,000.00 0.00 Implementa de type 3 à Cirunga, dans le Development Quotations Envelope 06 03 30 tion territoire de Kabare, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210975-CW- RFQ / Travaux de construction de trois (3) Pending laiteries de type 3 dont deux Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-09- IDA / 58520 Post Limited 96,000.00 0.00 Implementa (2) à Luvungi et une (1) à Development Quotations Envelope 06 03 30 tion Bwegera, dans le territoire d’Uvira, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210973-CW- RFQ / Travaux de construction de quatre (4) Pending laiteries de type 3 dont 1 à Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-09- IDA / 58520 Post Limited 130,000.00 0.00 Implementa Sange, 1 à Kavimvira et 2 à Development Quotations Envelope 06 03 30 tion Uvira, dans le territoire d’Uvira, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-188474-CW- RFQ / Travaux de constuction de sept Centres (Bâtiments) Communautaires Pending de Transformation de Manioc Agriculture Value Chain Request for Single Stage - One 2020-11- 2020-12- 2021-06- IDA / 58520 Post Limited 200,000.00 0.00 Implementa ( CCTMA) dont 1 à Kabimba, Development Quotations Envelope 05 31 29 tion 1 à Rugo, 1 à Rugumba, 2 à Katibili, 1 à Tabacongo et 1 à Lwamminwa dans la Province de Tanganyika GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PARSSA-6375-GO-RFQ / Pending Acquisition matériels Support Services and Project Request for Single Stage - One 2016-06- 2016-08- 2017-02- IDA / Q9260 Post Limited 16,000.00 0.00 Implementat informatiques en faveur du Management Quotations Envelope 17 12 08 ion personnel PICAGL ZR-PARSSA-5170-GO-RFQ / Under Acquisition de 3 véhicules en Support Services and Project Request for Single Stage - One 2015-10- 2015-12- 2016-06- IDA / Q9260 Post Limited 120,000.00 0.00 Implementat faveur des coordinations Management Quotations Envelope 15 10 07 ion provinciales ZR-PARSSA-5154-GO-DIR / Acquisition du logiciel de Support Services and Project 2015-09- 2015-09- 2015-11- 2015-10- 2016-05- IDA / Q9260 Post Direct Selection Direct 37,000.00 50,591.91 Signed gestion financière et Management 24 29 03 22 01 comptable Tom² pro MOF-REF-5 / Acquisition Agriculture Value Chain Request for Single Stage - One 2018-11- 2019-01- 2019-07- IDA / 58520 Post Limited 160,000.00 0.00 Canceled des camions Development Quotations Envelope 27 22 21 MOF-REF-6 / Acquisition des matériels pour la Support Services and Project Request for Single Stage - One 2018-11- 2019-01- 2019-07- vaccination contre la peste IDA / 58520 Post Limited 80,000.00 0.00 Canceled Management Quotations Envelope 28 23 22 bovine et la PPR dans les provinces de Sud Kivu et de Tanganyika MOF-REF-7 / Fourniture et mise en service des matériels informatiques et de Support Services and Project Single Stage - One 2018-10- 2018-10- 2018-12- 2019-01- 2019-02- 2019-08- IDA / 58520 Post Request for Bids Open - National 250,000.00 0.00 Canceled reprographie en faveur du Management Envelope 18 23 04 03 07 06 Projet et des services impliqués ZR-MINAGRI-78950-GO- RFQ / Acquisition de fournitures de bureau et Support Services and Project Request for Single Stage - One 2018-10- 2018-12- 2019-06- consommables informatiques IDA / 58520 Post Limited 60,000.00 0.00 Canceled Management Quotations Envelope 24 19 17 en faveur de l'Unité Nationale de Projet et les services impliqués du MINAGRI, PEL et DR ZR-MINAGRI-78990-GO- RFB / Acquisition des Support Services and Project Single Stage - One 2018-11- 2018-11- 2018-12- 2019-01- 2019-02- 2019-08- IDA / 58520 Post Request for Bids Open - National 150,000.00 0.00 Canceled matériels de sensibilisation Management Envelope 01 06 18 17 21 20 et visibilité en faveur de l'UNCP ZR-MINAGRI-78881-GO- RFQ / Fourniture et installation des équipements Support Services and Project Request for Single Stage - One 2018-10- 2018-10- 2018-12- 2018-12- 2019-05- IDA / 58520 Post Limited 24,000.00 18,547.00 Signed pour la connexion internet et Management Quotations Envelope 06 16 01 03 30 abonnement annuel du bureau de l'UPEP PICAGL Sud- Kivu ZR-MINAGRI-79034-GO- RFQ / Fourniture et Support Services and Project Request for Single Stage - One 2018-10- 2018-08- 2018-12- 2018-10- 2019-06- 2019-04- installation des mobiliers de IDA / 58520 Post Limited 30,000.00 31,481.80 Completed Management Quotations Envelope 20 20 15 03 13 30 bureau pour l'Unité Provinciale d’Exécution du PICAGL Sud-Kivu ZR-MINAGRI-79167-GO- Pending RFQ / Fournitures et mise Support Services and Project Request for Single Stage - One 2018-11- 2019-01- 2019-07- IDA / 58520 Post Limited 15,000.00 0.00 Implementat service des kits solaires Management Quotations Envelope 11 06 05 ion pour l'UPEP PICAGL Sud-Kivu ZR-MINAGRI-78817-GO- Pending RFQ / Acquisition de Support Services and Project Request for Single Stage - One 2018-10- 2018-12- 2019-06- IDA / 58520 Post Limited 15,000.00 0.00 Implementat carburant et lufrifiant pour Management Quotations Envelope 20 15 13 ion les véhicules de l'UPEP PICAGL Sud-Kivu ZR-MINAGRI-79039-GO- RFQ / Fourniture et mise en service des matériels Support Services and Project Request for Single Stage - One 2018-10- 2018-10- 2018-12- 2018-12- 2019-06- 2019-01- IDA / 58520 Post Limited 40,000.00 40,515.00 Completed informatiques et de Management Quotations Envelope 20 16 15 03 13 15 reprographie pour l’Unité Provinciale d’Exécution du PICAGL Sud-Kivu. ZR-MINAGRI-78971-GO- RFQ / Acquisition des Support Services and Project Request for Single Stage - One 2019-01- 2018-11- 2019-02- 2019-02- 2019-08- 2019-04- IDA / 58520 Post Limited 15,000.00 7,475.00 Completed matériels de sensibilisation Management Quotations Envelope 02 30 27 18 26 22 et visibilité en faveur de l'UPEP Sud Kivu ZR-MINAGRI-79095-GO- RFQ / Fourniture et installation des équipements Support Services and Project Request for Single Stage - One 2018-10- 2018-10- 2018-12- 2018-11- 2019-05- IDA / 58520 Post Limited 24,000.00 27,280.00 Signed pour la connexion internet et Management Quotations Envelope 06 26 01 22 30 abonnement annuel du bureau de l'UPEP PICAGL Tanganyika ZR-MINAGRI-79160-GO- RFQ / Fourniture et Support Services and Project Request for Single Stage - One 2018-10- 2018-10- 2018-12- 2018-12- 2019-06- 2019-04- installation des mobiliers de IDA / 58520 Post Limited 30,000.00 27,400.00 Completed Management Quotations Envelope 20 23 15 03 13 08 bureau pour l'Unité Provinciale d’Exécution du PICAGL Tanganyika ZR-MINAGRI-79165-GO- Pending RFQ / Fournitures et Support Services and Project Request for Single Stage - One 2018-11- 2019-01- 2019-07- IDA / 58520 Post Limited 15,000.00 0.00 Implementat installation des équipements Management Quotations Envelope 11 06 05 ion solaires pour l'UPEP PICAGL Tanganyika Page 3 ZR-MINAGRI-78973-GO- RFQ / Acquisition de Support Services and Project Request for Single Stage - One 2018-10- 2019-01- 2018-12- 2019-05- 2019-06- IDA / 58520 Post Limited 15,000.00 15,000.00 Signed carburant et lufrifiant pour Management Quotations Envelope 20 18 15 13 13 les véhicules de l'UPEP PICAGL Tanganyika ZR-MINAGRI-79163-GO- RFQ / Fourniture et mise en service des matériels Support Services and Project Request for Single Stage - One 2018-10- 2018-10- 2018-12- 2018-11- 2019-06- IDA / 58520 Post Limited 40,000.00 36,358.51 Signed informatiques et de Management Quotations Envelope 20 26 15 23 13 reprographie pour l’Unité Provinciale d’Exécution du PICAGL Tanganyika ZR-MINAGRI-79102-GO- RFQ / Acquisition des Support Services and Project Request for Single Stage - One 2019-01- 2018-10- 2019-02- 2018-12- 2019-08- IDA / 58520 Post Limited 15,000.00 11,565.00 Signed matériels de sensibilisation Management Quotations Envelope 02 26 27 03 26 et visibilité en faveur de l'UPEP Tanganyika ZR-MINAGRI-78926-GO- Support Services and Project 2018-09- 2018-10- 2018-09- 2018-10- 2018-11- 2019-04- DIR / Acquisition des IDA / 58520 Post Direct Selection Direct 700,000.00 461,362.00 Signed Management 15 22 20 25 30 23 véhicules 4X4 TT auprès de l'UNOPS ZR-MINAGRI-78949-GO- Pending Support Services and Project 2018-09- 2018-09- 2018-10- 2019-04- DIR / Acquisition des motos IDA / 58520 Post Direct Selection Direct 110,000.00 0.00 Implementat Management 15 20 25 23 DT 125 auprès de l'UNOPS ion ZR-MINAGRI-105380-GO- RFQ / Fourniture et montage des mobiliers pour le Pending personnel complémentaire Support Services and Project Request for Single Stage - One 2019-04- 2019-06- 2019-12- IDA / 58520 Post Limited 65,200.00 0.00 Implementat du PICAGL, la salle de Management Quotations Envelope 23 18 15 ion réunions du SG Agriculture et pour les services de l'Agriculture(SNSA, DPPV et DMPCC) ZR-MINAGRI-105371-GO- RFQ / Fourniture et Pending installation de matériels de Support Services and Project Request for Single Stage - One 2019-04- 2019-06- 2020-06- IDA / 58520 Post Limited 80,000.00 0.00 Implementat connexion internet pour le Management Quotations Envelope 23 18 17 ion bureau complémentaire de l'UNCP PICAGL ZR-MINAGRI-105378-GO- RFQ / Acquisition de fournitures de bureau et Pending consommables informatiques Support Services and Project Request for Single Stage - One 2019-05- 2019-06- 2019-12- IDA / 58520 Post Limited 60,000.00 0.00 Implementat en faveur de l'Unité Nationale Management Quotations Envelope 01 26 23 ion de Projet et les services impliqués du MINAGRI, PEL et DR ZR-MINAGRI-105314-GO- RFQ / Fourniture et mise en Pending service des matériels de Support Services and Project Request for Single Stage - One 2018-10- 2018-12- 2019-03- IDA / 58520 Post Limited 5,000.00 0.00 Implementat laboratoire du Service Management Quotations Envelope 24 19 19 ion National des Fertilisants et Intrants Connexes(SENAFIC) ZR-MINAGRI-105370-GO- RFQ / Acquisition des matériels de sensibilisation Support Services and Project Request for Single Stage - One 2019-06- 2019-05- 2019-07- 2019-06- 2020-01- IDA / 58520 Post Limited 15,000.00 14,523.75 Signed et visibilité en faveur de Management Quotations Envelope 02 30 28 25 24 l'UPEP Tanganyika pour l'exercice 2019 ZR-MINAGRI-105372-GO- RFQ / Fourniture et montage des mobiliers pour les Support Services and Project Request for Single Stage - One 2019-10- 2018-10- 2019-11- 2018-12- 2020-05- 2019-04- IDA / 58520 Post Limited 15,000.00 27,400.00 Completed inspections provinciales de Management Quotations Envelope 03 28 28 03 26 08 l'Agriculture et Dévelopement Rural de Tanganyka ZR-MINAGRI-105353-GO- RFQ / Fourniture et installation des matériels informatiques et de Support Services and Project Request for Single Stage - One 2019-10- 2019-05- 2019-11- 2019-06- 2020-05- reprographie pour les IDA / 58520 Post Limited 13,000.00 12,895.00 Signed Management Quotations Envelope 03 28 28 21 26 services du Ministère provincial de l'Agriculture, Pêche et Elevage et du Développement Rural du Tanganyka ZR-MINAGRI-105392-GO- RFQ / Acquisition de fournitures de bureau et consommables informatiques Support Services and Project Request for Single Stage - One 2019-05- 2019-05- 2019-06- 2019-06- 2019-12- IDA / 58520 Post Limited 18,000.00 17,971.65 Signed pour l'UPEP, les Inspections Management Quotations Envelope 03 30 28 21 25 Provinciales de l'Agriculture et du Développement Rural de Tanganyika ZR-MINAGRI-105400-GO- RFQ / Fourniture et installation du groupe electrogène de 60 kva pour Support Services and Project Request for Single Stage - One 2019-10- 2019-05- 2019-11- 2019-06- 2020-05- 2019-08- IDA / 58520 Post Limited 30,000.00 29,958.50 Completed le bâtiment l'inspection Management Quotations Envelope 03 24 28 12 26 23 provinciale de l'Agriculture et du Développement Rural Tanganyika ZR-MINAGRI-105329-GO- RFQ / Fourniture et installation de 20 splits de 12.000 BTU (dont 2 pour les Pending Support Services and Project Request for Single Stage - One 2019-10- 2019-11- 2020-05- locaux serveurs et 18 pour IDA / 58520 Post Limited 16,000.00 0.00 Implementat Management Quotations Envelope 03 28 26 les bureaux des inspections ion de l'Agriculrure et du Développement Rural) en faveur de l'UPEP Tanganyika ZR-MINAGRI-105323-GO- RFQ / Acquisition des Support Services and Project Request for Single Stage - One 2019-04- 2019-10- 2019-06- 2019-11- 2019-12- 2020-01- mobiliers des bureaux pour IDA / 58520 Post Limited 15,000.00 12,331.00 Completed Management Quotations Envelope 15 09 10 12 07 22 l'inspection provinciale de l'agriculture au Sud KIVU ZR-MINAGRI-105359-GO- RFQ / Acquisition des matériels informatiques pour Support Services and Project Request for Single Stage - One 2019-09- 2019-08- 2019-11- 2019-09- 2020-05- 2019-10- IDA / 58520 Post Limited 13,000.00 12,200.00 Completed les services du Ministère Management Quotations Envelope 21 16 16 17 14 02 Provincial de l’agriculture et UPEP Sud Kivu ZR-MINAGRI-105402-GO- RFQ / Acquisition de Support Services and Project Request for Single Stage - One 2019-04- 2019-06- 2019-06- 2019-08- 2019-12- carburant et lubrifiant pour IDA / 58520 Post Limited 15,000.00 9,996.80 Signed Management Quotations Envelope 12 26 07 28 04 les véhicules de l'UPEP PICAGL Sud Kivu Pending ZR-MINAGRI-105278-GO- Support Services and Project Request for Single Stage - One 2019-04- 2019-05- 2020-05- IDA / 58520 Post Limited 10,000.00 0.00 Implementat RFQ / travaux Management Quotations Envelope 01 27 26 ion ZR-MINAGRI-117750-GO- RFQ / Fourniture et Support Services and Project Request for Single Stage - One 2019-07- 2019-06- 2019-09- 2019-08- 2019-11- 2019-10- installation de groupe IDA / 58520 Post Limited 25,000.00 20,760.50 Completed Management Quotations Envelope 30 26 24 28 08 02 électrogène de 60 Kva pour le bureau de l'UPEP/Sud-Kivu ZR-MINAGRI-117751-GO- RFQ / Acquisition de fournitures de bureau et Support Services and Project Request for Single Stage - One 2019-07- 2019-10- 2019-09- 2019-11- 2019-11- consommables informatiques IDA / 58520 Post Limited 25,000.00 17,802.50 Signed Management Quotations Envelope 30 09 24 12 08 pour l'UPEP/Sud-Kivu, les Inspections de l'Agriculture et du Développement Rural ZR-MINAGRI-133012-GO- DIR / Acquisition et livraison de 2 véhicules Pending complémentaires pour le Support Services and Project 2019-10- 2019-10- 2019-12- 2019-12- IDA / 58520 Post Direct Selection Direct 110,000.00 0.00 Implementat Laboratoire Vétérinaire de Management 25 30 04 13 ion Kinshasa(LABOVET) et le Secrétariat Général au Développement Rural ZR-MINAGRI-170574-GO- RFQ / Acquisition mobiliers Pending Support Services and Project Request for Single Stage - One 2020-06- 2020-08- 2021-02- de bureaux complémentaires IDA / 58520 Post Limited 10,500.00 0.00 Implementat Management Quotations Envelope 20 15 11 pour le personnel l'UPEP ion Tanganyika ZR-MINAGRI-169843-GO- RFQ / Acquisition matériels de visibilité et sensibilisation Pending Support Services and Project Request for Single Stage - One 2020-05- 2020-07- 2021-01- du mécanisme de Gestion IDA / 58520 Post Limited 15,000.00 0.00 Implementat Management Quotations Envelope 20 15 11 des Plaintes (MGP) en faveur ion de l'UPEP Tanganyika exercice 2020 Tanganyika ZR-MINAGRI-169881-GO- RFQ / Fourniture et installation de splits de Pending 12000 BTU pour les bureaux Support Services and Project Request for Single Stage - One 2020-06- 2020-08- 2021-02- IDA / 58520 Post Limited 28,000.00 0.00 Implementat des inspections de Management Quotations Envelope 20 15 11 ion l'Agriculture et du Développement Rural de la province de Tanganyika ZR-MINAGRI-169913-GO- RFQ / Recrutement d'un prestataire pour l'entretien et Pending la réparation des splits des Support Services and Project Request for Single Stage - One 2020-06- 2020-08- 2021-02- IDA / 58520 Post Limited 15,000.00 0.00 Implementat bureaux des Inspections de Management Quotations Envelope 25 20 16 ion l'Agriculture et du Développement Rural de la Province de Tanganyika ZR-MINAGRI-169918-GO- CDD / Acquisitions de 52 Community Pending taureaux (géniteurs) en Agriculture Value Chain 2020-05- 2020-06- 2020-07- 2021-01- IDA / 58520 Post Driven Direct 120,000.00 0.00 Implementat faveur de l'Inspection Development 30 04 09 05 Development ion Provinciale de l'Agriculture, Pêche et Elevage du Sud Kivu Page 4 ZR-MINAGRI-169991-GO- RFQ / Acquisition des fournitures de bureau et consommables informatiques Pending pour les services des Support Services and Project Request for Single Stage - One 2020-01- 2020-03- 2020-09- IDA / 58520 Post Limited 25,000.00 0.00 Implementat Ministères provinciaux de Management Quotations Envelope 20 16 12 ion l'Agriculture, Pêche et Elevage et du Développement Rural et l'UPEP Tanganyika (Exercice 2020) ZR-MINAGRI-169902-GO- RFQ / Fourniture et Pending installation des kits solaires Support Services and Project Request for Single Stage - One 2020-06- 2020-08- 2021-02- IDA / 58520 Post Limited 20,000.00 0.00 Implementat pour le bâtiment de Management Quotations Envelope 20 15 11 ion l'inspection provinciale de l'Agriculture de Tanganyika ZR-MINAGRI-169993-GO- RFQ / Installation des équipements de la connexion internet ainsi que Pending l’abonnement annuel pour Support Services and Project Request for Single Stage - One 2020-06- 2020-08- 2021-02- IDA / 58520 Post Limited 30,000.00 0.00 Implementat les Bureaux de UPEP et des Management Quotations Envelope 20 15 11 ion Inspections Provinciales de l’Agriculture, Pêche, Elevage et du Développement Rural de Tanganyika ZR-MINAGRI-170560-GO- RFQ / Acquisition et installation de mobiliers de Support Services and Project Request for Single Stage - One 2020-08- 2020-03- 2020-10- 2020-05- 2021-04- bureau du Ministère IDA / 58520 Post Limited 15,000.00 11,020.00 Signed Management Quotations Envelope 20 19 15 05 13 Provincial de l"Agriculture, Pêche et Elevage, et Développement Rural du Sud- Kivu ZR-MINAGRI-170565-GO- RFQ / Fourniture et installation des kits solaires Support Services and Project Request for Single Stage - One 2020-08- 2020-11- 2020-10- 2021-01- 2021-04- IDA / 58520 Post Limited 20,000.00 31,318.90 Signed pour le bâtiment de Management Quotations Envelope 20 18 15 15 13 l'inspection provinciale de l'Agriculture de Sud Kivu ZR-MINAGRI-170575-GO- RFQ / Acquisition, installation et fourniture internet pour le nouveau Support Services and Project Request for Single Stage - One 2020-07- 2020-09- 2020-09- 2020-11- 2021-03- bâtiment des Inspections IDA / 58520 Post Limited 26,000.00 7,051.50 Signed Management Quotations Envelope 15 15 09 09 08 Provinciales de l'Agriculture, Pêche et Elevage, et du Développement Rural du Sud- Kivu et du Ministère Provincial ZR-MINAGRI-169976-GO- RFQ / Acquisition et montage des équipements informatiques et bureaux pour la coordination Support Services and Project Request for Single Stage - One 2020-05- 2020-02- 2020-07- 2020-03- 2021-01- 2020-09- provinciale du Sud-Kivu (4 IDA / 58520 Post Limited 32,000.00 21,715.00 Completed Management Quotations Envelope 20 17 15 24 11 04 onduleurs, 4 imprimentes, 4 stabilisateurs pour les 4 spécialistes, photocopiie en couleur) et pour le Ministre Provincial Agric du Sud Kivu ZR-MINAGRI-169898-GO- RFQ / Acquisition matériels de visibilité pour l'UPEP Sud Support Services and Project Request for Single Stage - One 2020-05- 2020-02- 2020-07- 2020-03- 2021-01- 2020-08- Kivu ( Roll up, T-shirt, IDA / 58520 Post Limited 30,000.00 28,270.00 Completed Management Quotations Envelope 21 17 16 24 12 21 Calendrier, Gilets, Képis, Agendas, Dépliants) pour l'exercice 2020 ZR-MINAGRI-169728-GO- RFQ / Acquisition des matériels et d'équipements Support Services and Project Request for Single Stage - One 2020-05- 2020-04- 2020-07- 2020-06- 2021-01- 2020-07- IDA / 58520 Post Limited 5,000.00 2,485.00 Completed de terrain (imperméables, Management Quotations Envelope 22 27 17 10 13 15 bottes, parapluies) en faveur de l'UPEP Sud Kivu ZR-MINAGRI-169813-GO- RFQ / Reproduction de guide Pending Support Services and Project Request for Single Stage - One 2020-05- 2020-07- 2021-01- des bonnes pratiques pour la IDA / 58520 Post Limited 7,500.00 0.00 Implementat Management Quotations Envelope 23 18 14 production végétales et ion animales au Sud Kivu ZR-MINAGRI-187940-GO- Pending RFQ / Acquisition des Support Services and Project Request for Single Stage - One 2020-10- 2020-11- 2021-05- IDA / 58520 Post Limited 150,000.00 0.00 Implementat matériels de visibilité et de Management Quotations Envelope 05 30 29 ion sensibilisation pour l'UNCP ZR-MINAGRI-188537-GO- RFQ / Acquisition mobiliers Pending Support Services and Project Request for Single Stage - One 2020-04- 2020-06- 2020-12- de bureaux complémentaires IDA / 58520 Post Limited 20,000.00 0.00 Implementat Management Quotations Envelope 20 15 12 pour le personnel de l 'UPEP ion Tanganyika ZR-MINAGRI-188508-GO- RFQ / Acquisition des équipements de transformation du manioc en Pending Agriculture Value Chain Request for Single Stage - One 2020-11- 2020-12- 2021-06- faveur de dix (10) Centres IDA / 58520 Post Limited 150,000.00 0.00 Implementat Development Quotations Envelope 04 30 28 Communautaires de ion Transformation de manioc dans la Province du Tanganyika ZR-MINAGRI-188515-GO- RFQ / Acquisition des équipements de Pending transformation du manioc en Agriculture Value Chain Request for Single Stage - One 2020-11- 2020-12- 2021-06- IDA / 58520 Post Limited 100,000.00 0.00 Implementat faveur de dix (10) Centres Development Quotations Envelope 05 31 29 ion Communautaires de Transformation de Maïs dans la Province du Tanganyika ZR-MINAGRI-188533-GO- RFQ / Acquisition d'1 drone et d' 1 appareil photo Pending professionnel et camera Support Services and Project Request for Single Stage - One 2020-11- 2021-01- 2021-06- IDA / 58520 Post Limited 6,000.00 0.00 Implementat hybride pour la couverture Management Quotations Envelope 06 01 30 ion communicationnelle des activités du Projet dans la Province du Tanganyika ZR-MINAGRI-188499-GO- RFQ / Acquisition de 5 motos en faveur de Délégués à Pied Pending d'Ouevre en charge de la Agriculture Value Chain Request for Single Stage - One 2020-11- 2021-01- 2021-07- IDA / 58520 Post Limited 24,000.00 0.00 Implementat surveillance des travaux de Development Quotations Envelope 07 02 01 ion construction des Centres Communautaires dans la Province du Tanganyika ZR-MINAGRI-188507-GO- RFQ / Acquisition de Pending matériels et équipements de Agriculture Value Chain Request for Single Stage - One 2020-10- 2020-12- 2021-06- IDA / 58520 Post Limited 60,000.00 0.00 Implementat provenderie pour les Development Quotations Envelope 25 20 18 ion éleveurs et les OP dans la ville de Kalemie/Tanganyika ZR-MINAGRI-188504-GO- RFQ / Acquisition et installation de 6 Pending Décortiqueuse à riz des Agriculture Value Chain Request for Single Stage - One 2020-11- 2020-12- 2021-06- IDA / 58520 Post Limited 120,000.00 0.00 Implementat coopératives rizicoles dans Development Quotations Envelope 03 29 27 ion les six bassins de production, territoire de Kalemie dans la province de Tanganyika MOF-REF-26 / Acquisition de 10 Tricycles pour la collecte de paddy des Pending Agriculture Value Chain Request for Single Stage - One 2020-11- 2020-12- 2021-06- coopératives rizicoles dans IDA / Q9610 Post Limited 50,000.00 0.00 Implementat Development Quotations Envelope 04 30 28 les six bassins de ion production, territoire de Kalemie dans la province de Tanganyika ZR-MINAGRI-188542-GO- RFQ / Acquisition de dix (10) Cages flottantes complètes Pending Agriculture Value Chain Request for Single Stage - One 2020-11- 2020-12- 2021-06- avec accessoires et IDA / 58520 Post Limited 40,000.00 0.00 Implementat Development Quotations Envelope 05 31 29 installation dans le territoire ion de Kalemie dans la province de Tanganyika ZR-MINAGRI-188505-GO- RFQ / Aiquisition et installation de 4 unités de pêche complete pour l'approvisionnement regulier Pending Agriculture Value Chain Request for Single Stage - One 2020-11- 2021-01- 2021-06- en poisson des unités de IDA / 58520 Post Limited 120,000.00 0.00 Implementat Development Quotations Envelope 06 01 30 transformation de plateforme ion et conservation du poisson à Kasambondo, Kabuga, Kalemie et Kabimba dans la Province du Tanganyika ZR-MINAGRI-188526-GO- RFQ / Fourniture, installation des matériels pour Pending Support Services and Project Request for Single Stage - One 2020-08- 2020-10- 2021-04- connexion internet ainsi que IDA / 58520 Post Limited 13,000.00 0.00 Implementat Management Quotations Envelope 20 15 13 l'abonnement annuel en ion faveur du bureau du Ministre de l'agriculture de Tanganyika ZR-MINAGRI-188544-GO- RFQ / Acquisition et installation de 10 splits muraux en faveur du Support Services and Project Request for Single Stage - One 2020-09- 2020-08- 2020-11- 2020-11- 2021-05- bâtiment devant servir des IDA / 58520 Post Limited 8,500.00 8,100.00 Signed Management Quotations Envelope 20 24 15 09 14 bureaux pour l'UPEP et Inspections Provinciales de de l'Agriculture et Pêche de la Prvonce du Sud Kivu Page 5 ZR-MINAGRI-188511-GO- RFB / Acquisition d'un lot de 120 génisses pour les Pending Agriculture Value Chain Single Stage - One 2020-10- 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- coopératives, les éleveurs IDA / 58520 Post Request for Bids Open - National 100,000.00 0.00 Implementat Development Envelope 16 21 02 01 05 04 particuliers et les OP dans le ion territoire de Kalemie/Tanganyika ZR-MINAGRI-188502-GO- RFQ / Acquisition des équipements de Pending transformation du manioc en Agriculture Value Chain Request for Single Stage - One 2020-11- 2021-01- 2021-06- IDA / 58520 Post Limited 90,000.00 0.00 Implementat faveur de Centres Development Quotations Envelope 06 01 30 ion Communautaires de Transformation du Riz dans la Province du Tanganyika ZR-MINAGRI-187936-GO- RFQ / Fourniture et mise en service des matériels Pending informatiques, de Support Services and Project Request for Single Stage - One 2020-11- 2020-12- 2021-02- IDA / 58520 Post Limited 250,000.00 0.00 Implementat reproduction et de Management Quotations Envelope 03 29 27 ion vidéoconférence pour le personnel du projet ainsi que les services impliqués ZR-MINAGRI-209975-GO- RFQ / Acquisition de fournitures de bureau et consommables informatiques Pending Support Services and Project Request for Single Stage - One 2020-12- 2021-02- 2021-08- pour l’UPEP PICAGL Sud-Kivu IDA / 58520 Post Limited 30,000.00 0.00 Implementat Management Quotations Envelope 25 19 18 et les Inspections ion provinciales de l'Agriculture, Pêche et Elevage, et du Développement Rural du Sud- Kivu ZR-MINAGRI-210054-GO- RFQ / Acquisition des moulins à manioc en faveur Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- de vingt-deux (22) Centres IDA / 58520 Post Limited 66,000.00 0.00 Implementat Development Quotations Envelope 15 12 09 de Collecte et de ion Transformation de Manioc, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210048-GO- RFQ / Acquisition des presses à vérins hydrauliques Pending motorisées en faveur de Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 98,000.00 0.00 Implementat vingt-deux (22) Centres de Development Quotations Envelope 15 12 09 ion Collecte et de Transformation de Manioc, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210053-GO- RFQ / Acquisition des râpeuses avec châssis en Pending faveur de vingt-deux (22) Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 60,000.00 0.00 Implementat Centres de Collecte et de Development Quotations Envelope 15 12 09 ion Transformation de Manioc, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210046-GO- RFQ / Acquisition des séchoirs solaires en faveur Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- de vingt-deux (22) Centres IDA / 58520 Post Limited 66,000.00 0.00 Implementat Development Quotations Envelope 15 12 09 de Collecte et de ion Transformation de Manioc, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210051-GO- RFQ / Acquisition des kits d'insémination artificielle en Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- faveur de trois (3) IDA / 58520 Post Limited 25,000.00 0.00 Implementat Development Quotations Envelope 22 19 16 institutions et cabinets ion spécialisés, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210058-GO- RFQ / Acquisition des Pending équipements en faveur de Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 45,000.00 0.00 Implementat deux (2) micro-minoteries Development Quotations Envelope 22 19 16 ion du riz, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210056-GO- RFQ / Acquisition des Pending équipements en faveur d'un Agriculture Value Chain Request for Single Stage - One 2021-03- 2021-04- 2021-10- IDA / 58520 Post Limited 35,000.00 0.00 Implementat (1) Centre de Collecte du Development Quotations Envelope 01 26 23 ion Lait, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210059-GO- RFQ / Fourniture et Pending installation des kits solaires Agriculture Value Chain Request for Single Stage - One 2021-03- 2021-04- 2021-10- IDA / 58520 Post Limited 35,000.00 0.00 Implementat en faveur d'un (1) Centre de Development Quotations Envelope 01 26 23 ion Collecte du Lait, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210055-GO- RFQ / Acquisition des équipements en faveur de Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- trois (3) Provenderies à IDA / 58520 Post Limited 28,000.00 0.00 Implementat Development Quotations Envelope 22 19 16 Luvungi, Kabare et Bukavu, ion dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210082-GO- RFQ / Acquisition de vingt (20) tricycles motorisés en faveur de coopératives, associations et autres, pour Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- la collecte et le transport de IDA / 58520 Post Limited 80,000.00 0.00 Implementat Development Quotations Envelope 24 21 18 paddy, manioc, boutures, ion lait,..., dans le bassin d'Uvira, Province du Sud-Kivu,dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210084-GO- RFQ / Acquisition de dix (10) tricycles motorisés en faveur de coopératives, associations Pending et autres, pour la collecte et Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 40,000.00 0.00 Implementat le transport de paddy, Development Quotations Envelope 24 21 18 ion manioc, boutures, lait, ... dans le bassin de Fizi, Province du Sud-Kivu, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210081-GO- RFQ / Acquisition de dix- sept (17) tricycles motorisés en faveur de coopératives, Pending associations et autres, pour Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 68,000.00 0.00 Implementat la collecte et le transport de Development Quotations Envelope 24 21 18 ion paddy, manioc, boutures, lait,..., dans les bassins de Kalehe, Kabare et Walungu, Province du Sud-Kivu ZR-MINAGRI-210090-GO- RFQ / Acquisition des Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- produits vétérinaires, dans le IDA / 58520 Post Limited 95,000.00 0.00 Implementat Development Quotations Envelope 22 19 16 cadre du PICAGL, UPEP Sud- ion Kivu ZR-MINAGRI-210086-GO- RFQ / Acquisition des découpeuses avec châssis en Pending faveur de vingt-deux (22) Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 55,000.00 0.00 Implementat Centres de Collecte et de Development Quotations Envelope 15 12 09 ion Transformation de Manioc,dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210089-GO- RFQ / Acquisition des machines pour coudre les sacs en faveur de vingt-deux Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- (22) Centres de Collecte et IDA / 58520 Post Limited 25,000.00 0.00 Implementat Development Quotations Envelope 15 12 09 de Transformation de Manioc ion et trois (3) provenderies, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210446-GO- RFQ / Acquisition des matériels et équipements pour le conditionnement et la conservation du lait en Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- faveur de huit (8) mini- IDA / 58520 Post Limited 50,000.00 0.00 Implementat Development Quotations Envelope 17 14 11 laiteries de type 3, quatorze ion (14) mini-laiteries de type 2 et deux (2) mini-laiteries de type 1, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210445-GO- RFQ / Acquisition des matériels pour la pasteurisation du lait en Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- faveur de huit (8) mini- IDA / 58520 Post Limited 45,000.00 0.00 Implementat Development Quotations Envelope 17 14 11 laiteries de type 3 et ion quatorze (14) mini-laiteries de type 2, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210448-GO- RFQ / Acquisition des réchauds à gaz en faveur de Pending huit (8) mini-laiteries de type Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 12,000.00 0.00 Implementat 3 et quatorze (14) mini- Development Quotations Envelope 17 14 11 ion laiteries de type 2, dans le cadre du PICAGL, UPEP Sud- Kivu Page 6 ZR-MINAGRI-210449-GO- RFQ / Acquisition des kits solaires en faveur de huit (8) mini-laiteries de type 3, Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- quatorze (14) mini-laiteries IDA / 58520 Post Limited 36,000.00 0.00 Implementat Development Quotations Envelope 17 14 11 de type 2 et deux (2) mini- ion laiteries de type 1, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210642-GO- RFQ / Acquisition des matériels d’entreposage en faveur de 33 mini-minoteries Pending de manioc, 19 rizeries de Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 50,000.00 0.00 Implementat type 1 (Zaccaria ou Development Quotations Envelope 20 17 14 ion équivalent), 6 rizeries de type 2 (SB-50 ou équivalent) et 3 provenderies, dans le cadre du Projet PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210644-GO- RFQ / Acquisition des sacs d’emballage en faveur de 33 mini-minoteries de manioc, Pending 19 rizeries de type 1 Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 40,000.00 0.00 Implementat (Zaccaria ou équivalent), 6 Development Quotations Envelope 16 13 10 ion rizeries de type 2 (SB-50 ou équivalent) et 3 provenderies, dans le cadre du Projet PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210645-GO- RFQ / Acquisition des équipements en faveur de Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- trente-trois (33) mini IDA / 58520 Post Limited 99,000.00 0.00 Implementat Development Quotations Envelope 20 17 14 minoteries de manioc, dans ion le cadre du Projet PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210646-GO- RFQ / Acquisition des décortiqueuses en faveur de Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- six (6) rizeries de type 2 (SB- IDA / 58520 Post Limited 90,000.00 0.00 Implementat Development Quotations Envelope 20 17 14 50 ou équivalent), dans le ion cadre du Projet PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210647-GO- RFQ / Acquisition des générateurs d'énergie en faveur de 33 mini-minoteries Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- de manioc, 19 rizeries de IDA / 58520 Post Limited 72,000.00 0.00 Implementat Development Quotations Envelope 20 17 14 type 1 (Zaccaria ou ion équivalent) et 6 rizeries de type 2 (SB-50 ou équivalent), dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-211078-GO- RFQ / Acquisition, installation et fourniture de la connexion internet aux Pending Support Services and Project Request for Single Stage - One 2021-01- 2021-03- 2021-09- bureaux de l'UPEP Sud-Kivu IDA / 58520 Post Limited 20,000.00 0.00 Implementat Management Quotations Envelope 30 27 23 et du Ministre Provincial de ion l'Agriculture, Pêche et Elevage, et Développement Rural du Sud-Kivu ZR-MINAGRI-211393-GO- RFQ / Acquisition des taureaux géniteurs de race Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- améliorée à livrer dans le IDA / 58520 Post Limited 25,000.00 0.00 Implementat Development Quotations Envelope 27 24 21 bassin de Fizi-Mutambala, ion dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-211394-GO- RFQ / Acquisition des taureaux géniteurs de race Pending Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- améliorée à livrer dans la IDA / 58520 Post Limited 70,000.00 0.00 Implementat Development Quotations Envelope 27 24 21 plaine de Ruzizi et moyens ion plateaux, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-211397-GO- RFQ / Acquisition des Pending taureaux géniteurs de race Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 50,000.00 0.00 Implementat améliorée à livrer à Kalehe, Development Quotations Envelope 27 24 21 ion dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-211395-GO- RFQ / Acquisition des Pending taureaux géniteurs de race Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 25,000.00 0.00 Implementat améliorée à livrer à Walungu, Development Quotations Envelope 27 24 21 ion dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-211396-GO- RFQ / Acquisition des Pending taureaux géniteurs de race Agriculture Value Chain Request for Single Stage - One 2021-02- 2021-04- 2021-10- IDA / 58520 Post Limited 55,000.00 0.00 Implementat améliorée à livrer à Kabare, Development Quotations Envelope 27 24 21 ion dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-214234-GO- RFB / Acquisition des décortiqueuses en faveur de Pending Agriculture Value Chain Single Stage - One 2021-02- 2021-03- 2021-04- 2021-05- 2021-06- 2021-12- dix-neuf (19) rizeries de type IDA / 58520 Post Request for Bids Open - National 500,000.00 0.00 Implementat Development Envelope 26 03 14 14 18 15 1 (Zaccaria Modèle ZX-6 ou ion équivalent), dans le cadre du Projet PICAGL, UPEP Sud-Kivu NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-MINAGRI-79168-NC- RFQ / Location des bureaux Pending Support Services and Project Request for Single Stage - One 2018-10- 2018-12- 2019-06- devant abriter le personnel IDA / 58520 Post Limited 60,000.00 0.00 Implementat Management Quotations Envelope 18 13 11 complémentaire de l'UNCP ion PICAGL ZR-MINAGRI-78968-NC- RFQ / Location des bureaux Support Services and Project Request for Single Stage - One 2018-08- 2018-06- 2018-10- 2018-10- 2019-04- devant abriter l’Unité IDA / 58520 Post Limited 30,000.00 30,000.00 Signed Management Quotations Envelope 18 25 13 02 11 Provinciale d’Exécution du PICAGL Sud-Kivu ZR-MINAGRI-79170-NC- RFQ / Fourniture des services Support Services and Project Request for Single Stage - One 2018-09- 2018-07- 2018-11- 2018-10- 2019-05- de gardiennage à l’Unité IDA / 58520 Post Limited 14,000.00 8,940.00 Signed Management Quotations Envelope 08 09 03 04 02 Provinciale d’Exécution du PICAGL Sud-Kivu ZR-MINAGRI-79128-NC- RFQ / Services d’entretien Support Services and Project Request for Single Stage - One 2018-09- 2018-08- 2018-11- 2018-10- 2019-05- des bureaux de l’Unité IDA / 58520 Post Limited 9,600.00 7,200.00 Signed Management Quotations Envelope 08 20 03 04 02 Provinciale d’Exécution du PICAGL Sud-Kivu ZR-MINAGRI-79094-NC-DIR / Location des bureaux Support Services and Project 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-09- 2019-03- 2019-09- devant abriter l’Unité IDA / 58520 Post Direct Selection Direct 36,000.00 36,000.00 Completed Management 13 13 18 15 22 15 21 15 Provinciale d’Exécution du PICAGL Tanganyika ZR-MINAGRI-79148-NC- RFQ / Fourniture des services Support Services and Project Request for Single Stage - One 2018-09- 2018-10- 2018-11- 2018-12- 2019-05- de gardiennage à l’Unité IDA / 58520 Post Limited 14,000.00 11,720.00 Signed Management Quotations Envelope 08 23 03 04 02 Provinciale d’Exécution du PICAGL Tanganyika ZR-MINAGRI-78928-NC- RFQ / Services d’entretien Support Services and Project Request for Single Stage - One 2018-09- 2018-10- 2018-11- 2018-12- 2019-05- des bureaux de l’Unité IDA / 58520 Post Limited 9,600.00 7,200.00 Signed Management Quotations Envelope 08 24 03 06 02 Provinciale d’Exécution du PICAGL Tanganyika ZR-MINAGRI-105102-NC- RFQ / Prestataire de service Pending pour le gardiennage des Support Services and Project Request for Single Stage - One 2019-04- 2019-06- 2020-06- IDA / 58520 Post Limited 17,000.00 0.00 Implementat bureaux du personnel Management Quotations Envelope 06 01 01 ion complémentaire de l'UNCP PICAGL ZR-MINAGRI-105298-NC- RFQ / Prestataire de service Pending Support Services and Project Request for Single Stage - One 2018-10- 2018-12- 2019-12- pour le nettoyage des IDA / 58520 Post Limited 15,000.00 0.00 Implementat Management Quotations Envelope 18 13 12 bureaux du personnel ion complémentaire de l'UNCP PICAGL ZR-MINAGRI-105101-NC- RFQ / Affretement d'un avion Pending Support Services and Project Request for Single Stage - One 2019-03- 2019-05- 2019-11- pour les missions conjointes IDA / 58520 Post Limited 100,000.00 0.00 Implementat Management Quotations Envelope 18 13 09 de supervision ion (Gouvernement Banque mondiale) ZR-MINAGRI-105389-NC- RFQ / Sélection d'un prestataire pour l'entretien et Pending Support Services and Project Request for Single Stage - One 2019-04- 2019-05- 2020-05- réparation des véhicules, IDA / 58520 Post Limited 14,000.00 0.00 Implementat Management Quotations Envelope 02 28 05 motos motos et groupe ion électrogène(IRD) pour l'UPEP Tanganyika ZR-MINAGRI-105388-NC- RFQ / Sélection d'un Pending Support Services and Project Request for Single Stage - One 2019-11- 2019-12- 2020-06- prestataire pour l'entretien et IDA / 58520 Post Limited 14,000.00 0.00 Implementat Management Quotations Envelope 02 28 25 réparation des splits muraux ion pour l'UPEP Tanganyika Page 7 ZR-MINAGRI-105296-NC- RFQ / Recrutement d'un prestataire pour l'entretien et Support Services and Project Request for Single Stage - One 2019-05- 2019-05- 2019-06- 2019-06- 2020-06- réparation des matériels IDA / 58520 Post Limited 8,000.00 7,800.00 Signed Management Quotations Envelope 03 28 28 24 26 informatiques et de reprographie pour l'UPEP Tanganyika MOF-REF-125 / Sélection d'un prestataire pour Pending l'entretien et réparation des Support Services and Project Request for Single Stage - One 2019-04- 2019-06- 2020-06- IDA / 58520 Post Limited 20,000.00 0.00 Implementat véhicules, motos et groupe Management Quotations Envelope 14 09 08 ion électrogène(IRD) pour l'UPEP Sud Kivu ZR-MINAGRI-170554-NC- Pending DIR / Mise à jour et Support Services and Project 2020-07- 2020-07- 2020-09- 2021-03- IDA / 58520 Post Direct Selection Direct 37,500.00 0.00 Implementat utilisation de la version Management 25 30 03 02 ion TOMPRO WEB du logiciel PICAGL ZR-MINAGRI-169816-NC- DIR / Renouvellement du Contrat avec Union pour l'Emancipation de la Femme Support Services and Project 2020-01- 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-08- IDA / 58520 Post Direct Selection Direct 7,200.00 7,200.00 Signed Autochtone (UEFA ) pour Management 02 01 07 02 11 10 09 l'entretien des bureaux de l’Unité Provinciale d’Exécution de Projet (UPEP) Tanganyika ZR-MINAGRI-169814-NC- DIR / Renouvellement du Contrat avec le prestataire HUMAN DIGNITY IN THE Support Services and Project 2020-01- 2019-12- 2020-01- 2020-02- 2020-02- 2020-02- 2020-08- IDA / 58520 Post Direct Selection Direct 10,920.00 10,920.00 Signed WORLD (HDW) pour le Management 03 02 08 05 12 06 10 gardiennage des bureaux de l’Unité Provinciale d’Exécution de Projet Tanganyika ZR-MINAGRI-169988-NC- RFQ / Selection d'un Under prestataire pour l'entretien et Support Services and Project Request for Single Stage - One 2020-05- 2020-02- 2020-07- 2021-01- IDA / 58520 Post Limited 20,000.00 19,754.20 Implementat réparation des véhicules, Management Quotations Envelope 26 17 21 17 ion motos et groupe electrogène pour l'UPEP Sud-Kivu ZR-MINAGRI-188482-NC- DIR / Contractualisation avec les radios, télévisions communautaires et Associations locales pour la Pending communication sociale de Support Services and Project 2020-08- 2020-08- 2020-09- 2021-03- IDA / 58520 Post Direct Selection Direct 35,000.00 0.00 Implementat proximité dans la Province Management 16 21 25 24 ion du Tanganyika ( RTNC, RTGT, TELE 6, AFYA FM, RADIO KAOZE, COJELTA, CJDT et BAKOYOKA SON naTanganyika) ZR-MINAGRI-170570-NC- RFQ / Contractualisation avec huit radios communautaires au Sud Kivu pour la sensibilisation des Pending Support Services and Project 2020-08- 2020-08- 2020-09- 2021-03- activités du Projet ( Radio IDA / 58520 Post Direct Selection Direct 35,000.00 0.00 Implementat Management 15 20 24 23 Maéndeleo, Radio Umoja, ion Radio Baraka, Radio Messager du Peuple, Radio notre Dame de Tanganyika, Radio Flash FM, Radio AMKA, Radio RTBO) ZR-MINAGRI-196114-NC- RFQ / Recrutement d'un prestataire des services de Support Services and Project Request for Single Stage - One 2020-10- 2020-10- 2020-12- 2020-11- 2021-06- gardiennage des bureaux de IDA / 58520 Post Limited 14,000.00 9,600.00 Signed Management Quotations Envelope 20 02 15 09 13 l’Unité Provinciale d’Exécution du Projet PICAGL (UPEP) / Sud-Kivu ZR-MINAGRI-196116-NC- RFQ / Recrutement d'un prestataire des services d’entretien des bureaux et Support Services and Project Request for Single Stage - One 2020-10- 2020-10- 2020-12- 2020-11- 2021-06- IDA / 58520 Post Limited 14,000.00 10,800.00 Signed d'aménagement de la Cour Management Quotations Envelope 20 02 15 09 13 de l’Unité Provinciale d’Exécution du Projet PICAGL (UPEP) / Sud-Kivu ZR-MINAGRI-210104-NC- RFQ / Recrutement d'un prestataire des services de Pending Support Services and Project Request for Single Stage - One 2021-01- 2021-03- 2021-09- gardiennage des bureaux de IDA / 58520 Post Limited 14,000.00 0.00 Implementat Management Quotations Envelope 10 07 03 l’Unité Provinciale ion d’Exécution du Projet PICAGL (UPEP) / Tanganyika ZR-MINAGRI-210105-NC- RFQ / Recrutement d'un prestataire des services Pending d’entretien des bureaux et Support Services and Project Request for Single Stage - One 2021-01- 2021-03- 2021-09- IDA / 58520 Post Limited 15,000.00 0.00 Implementat d'aménagement de la Cour Management Quotations Envelope 10 07 03 ion de l’Unité Provinciale d’Exécution du Projet PICAGL (UPEP) / Tanganyika CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PARSSA-4343-CS-CQS / Consultant Recrutement d'un Cabinet Support Services and Project 2016-12- 2017-02- 2017-03- 2016-09- 2017-04- 2016-09- 2017-10- IDA / Q9260 Post Qualification Open - National 90,000.00 81,902.00 Signed 2016-12-08 pour la Sélection du Management 29 11 13 13 17 21 14 Selection Personnel Essentiel du PICAGL ZR-PARSSA-5160-CS-QBS / Elaboration schéma directeur Agriculture Value Chain Quality Based Open - Pending 2015-11- 2016-01- 2016-01- 2016-02- 2016-03- 2016-05- 2017-05- IDA / Q9260 Post 500,000.00 0.00 2015-10-29 sur le corridor Bukavu-Uvira- Development Selection International Implementation 19 02 30 29 30 04 04 Kalemie ZR-MINAGRI-78952-CS- QCBS / Recrutement d'un Support for the development consultant firme pour la Quality And Cost- Pending 2018-10- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2020-04- IDA / 58520 of the private agro- Post Open - National 500,000.00 0.00 2018-10-02 réalisation des études Based Selection Implementation 23 06 03 02 09 13 12 industrial sector sectorielles pour la mise en place de parc agroindustriel ZR-MINAGRI-78955-CS- QCBS / Recrutement d'un Support for the development consultant firme pour la Quality And Cost- Open - Pending 2018-10- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2020-04- IDA / 58520 of the private agro- Post 500,000.00 0.00 2018-10-02 réalisation de l'étude du Based Selection International Implementation 23 06 03 02 09 13 12 industrial sector marché pour le parc agroindustriel ZR-MINAGRI-78984-CS- QCBS / Recrutement d'un Support for the development Quality And Cost- Open - Pending 2018-10- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2020-04- consultant firme pour le IDA / 58520 of the private agro- Post 500,000.00 0.00 2018-10-02 Based Selection International Implementation 23 06 03 02 09 13 12 renforcement des capacités industrial sector des institutions financières ZR-MINAGRI-79138-CS-QBS / Recrutement d'une ONG Agriculture Value Chain Quality Based Under 2020-09- 2018-12- 2019-02- 2019-03- 2019-04- 2019-05- 2019-06- 2020-06- spécialisée dans les IDA / 58520 Post Open - National 150,000.00 0.00 2018-12-01 Development Selection Implementation 11 22 04 04 03 03 07 06 questions des violences basées sur le genre VSBG ZR-MINAGRI-78906-CS- QCBS / Recrutement d'un consultant firme pour la Support Services and Project Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2020-05- réalisation des études IDA / 58520 Prior Open - National 500,000.00 0.00 Canceled 2018-11-10 Management Based Selection 01 14 11 13 17 22 21 d'orientation pour l'appui aux services fonciers dans l'aire d'intervention du PICAGL ZR-MINAGRI-78816-CS- QCBS / Consultant chargé Agriculture Value Chain Quality And Cost- Pending 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-06- 2020-06- d'évaluation de la sécurité IDA / 58520 Post Open - National 100,000.00 0.00 2018-12-17 Development Based Selection Implementation 07 20 20 19 24 28 27 alimentaire dans les zones du projet ZR-MINAGRI-79114-CS- QCBS / Recrutement d''un auditeur externe pour la Support Services and Project Quality And Cost- Open - Under 2019-01- 2018-10- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2020-04- certification des états IDA / 58520 Post 170,000.00 0.00 2018-10-02 Management Based Selection International Implementation 19 23 06 03 02 09 13 12 financiers des exercices comptables 2018, 2019 et 2020 ZR-MINAGRI-105374-CS- QCBS / Recrutement d'un consultant firme pour la Support Services and Project Quality And Cost- Open - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2019-12- 2020-12- réalisation des études IDA / 58520 Prior 500,000.00 0.00 Canceled 2019-06-17 Management Based Selection International 08 21 18 18 22 27 26 d'orientation pour l'appui aux services fonciers dans l'aire d'intervention du PICAGL ZR-MINAGRI-78821-CS-QBS / Recrutement d'un Support Services and Project Quality Based Open - 2019-05- 2018-12- 2019-02- 2019-03- 2019-04- 2019-05- 2019-06- 2020-06- consultant firme pour la IDA / 58520 Prior 500,000.00 0.00 Canceled 2018-12-10 Management Selection International 28 31 13 13 12 12 16 15 réalisation de l' étude de référence du projet ZR-MINAGRI-140241-CS- CQS / Bureau d’Etude pour l'élaboration de la Notice d’Impact Environnemental et Consultant Support Services and Project 2019-11- 2020-01- 2020-01- 2020-03- 2021-03- Social de la construction de IDA / 58520 Post Qualification Open - National 70,000.00 0.00 Canceled 2019-10-28 Management 18 01 31 06 06 la microcentrale Selection hydroélectrique de MUTSUVA dans le territoire de KABARE, Province du SUD- KIVU. Page 8 ZR-MINAGRI-140242-CS- CQS / Bureau d’Etude pour la réalisation des études techniques des travaux de Consultant 2019-11- 2020-01- 2020-02- 2020-03- 2020-05- construction de la IDA / 58520 Regional integration Post Qualification Open - National 120,000.00 0.00 Canceled 2019-11-08 29 12 11 17 16 microcentrale Selection hydroélectrique de MUTSUVA dans le territoire de KABARE, Province du SUD- KIVU. ZR-MINAGRI-169986-CS- CQS / Recrutement d'un bureau d'études pour la réalisation des études Consultant techniques et Support Services and Project Under 2020-09- 2020-08- 2020-09- 2020-10- 2020-12- 2021-06- IDA / 58520 Post Qualification Open - National 50,000.00 0.00 2020-07-26 environnementales des Management Implementation 11 16 29 29 03 01 Selection travaux d'aménagement des bureaux DMPCC, ancien bureaux du Secrétaire Général et PARRSA ZR-MINAGRI-169823-CS- CQS / Recrutement d'un consultant (bureau d'étude) Consultant pour la rélisation des études Support Services and Project Pending 2020-08- 2020-10- 2020-11- 2020-12- 2021-06- IDA / 58520 Post Qualification Open - National 250,000.00 0.00 2020-07-29 faisabilités techniques et Management Implementation 19 02 01 06 04 Selection soci-environnementales de trois plates formes multiservices dans la Province du Sud-Kivu MOF-REF-45 / Recrutement d'une ONG spécialisée en Support Services and Project Quality And Cost- Open - 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2020-05- IDA / 58520 Prior 500,000.00 0.00 Canceled 2018-11-15 gestion de conflits dans l'aire Management Based Selection International 06 19 16 18 22 27 26 d'intervention de PICAGL ZR-MINAGRI-105368-CS- CQS / Recrutement d'une Consultant ONG pour la mise en œuvre Support Services and Project Pending 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 58520 Post Qualification Open - National 350,000.00 0.00 2020-10-14 du Plan d'Actions en Faveur Management Implementation 04 18 17 21 20 Selection des Populations Autoctones de l'aire d'intervention du PICAGL ZR-MINAGRI-140242-CS- CQS-2 / Bureau d’Etude pour la réalisation des études d'impacts environnemental et Consultant social des travaux de Pending 2020-11- 2021-01- 2021-02- 2021-03- 2021-05- IDA / 58520 Regional integration Post Qualification Open - National 70,000.00 0.00 2020-10-31 construction de la Implementation 21 04 03 10 09 Selection microcentrale hydroélectrique de MUTSUVA dans le territoire de KABARE, Province du SUD-KIVU. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PARSSA-4340-CS-CDS / Consultant individuel devant actualiser le manuel des procédures administratives, Support Services and Project 2016-12- 2017-02- 2016-09- 2017-08- IDA / Q9260 Prior Direct Selection Direct 25,000.00 41,591.00 Signed 2016-12-08 financières, comptables et Management 18 21 05 20 passation des marchés de l'UNCP PARRSA en prenant compte l'exécution de PICAGL ZR-PARSSA-6313-CS-CDS / Recrutement consultant Support Services and Project 2015-12- 2016-02- 2015-12- 2016-08- élaboration des documents IDA / Q9260 Prior Direct Selection Direct 200,000.00 190,630.00 Signed 2015-12-10 Management 20 23 03 21 cadres de gestion environnementale ZR-PARSSA-6325-CS-CDS / Consultant individuel en Support Services and Project 2015-08- 2015-10- 2015-07- 2016-04- IDA / Q9260 Prior Direct Selection Direct 25,000.00 24,104.00 Signed 2015-07-25 charge de l' élaboration Management 04 08 03 05 termes de référence ZR-PARSSA-6314-CS-INDV / Recrutement de deux Individual Support Services and Project 2016-06- 2016-06- 2015-11- 2016-08- 2016-01- 2017-01- Consultants individuels en IDA / Q9260 Post Consultant Limited 32,000.00 36,000.00 Signed 2016-06-02 Management 07 28 27 02 18 29 appui aux comités Selection préparatoires ZR-PARSSA-6321-CS-CDS / Recrutement d'un Consultant Support Services and Project 2016-09- 2016-11- 2016-09- 2017-05- individuel pour la mise à jour IDA / Q9260 Prior Direct Selection Direct 25,000.00 41,591.00 Signed 2016-09-16 Management 26 30 15 29 du PARRSA pour tenir compte de PICAGL ZR-PARSSA-5149-CS-CDS / Recrutement du Consortium Agriculture Value Chain 2016-06- 2016-08- 2016-11- 2017-02- UCB-UEA- SENASEM pour la IDA / Q9260 Prior Direct Selection Direct 120,000.00 1,044,956.00 Signed 2016-06-13 Development 23 27 21 23 sélection participative des variétés de riz ZR-PARSSA-5150-CS-INDV / Recrutement de trois Individual Support Services and Project Pending 2016-11- 2016-12- 2017-01- 2017-07- chauffeurs en faveur des IDA / Q9260 Post Consultant Open 12,000.00 0.00 2016-09-30 Management Implementation 18 09 13 12 coordinations provinciales Selection PICAGL ZR-MINAGRI-78820-CS- CDS / Contractualusation Agriculture Value Chain 2018-11- 2019-02- 2019-01- 2019-08- avec RIKOLTO pour l'appui à IDA / 58520 Prior Direct Selection Direct 3,000,000.00 5,500,000.00 Under Review 2018-11-20 Development 30 03 14 02 la mise en œuvre de la chaine de valeur riz ZR-MINAGRI-78874-CS- CDS / Contractualusation avec IITA pour l'appui à la Agriculture Value Chain 2019-01- 2019-03- 2019-01- 2019-09- IDA / 58520 Prior Direct Selection Direct 10,950,000.00 10,209,591.00 Signed 2018-12-27 mise en œuvre de la chaine Development 06 12 10 08 de valeur manioc et création de l'emploi des jeunes ZR-MINAGRI-78980-CS- CDS / Contractualusation avec les instituts de CGIAR pour l'appui à la mise en 2019-01- 2019-03- 2019-03- 2019-09- IDA / 58520 Regional integration Prior Direct Selection Direct 7,780,000.00 8,834,538.00 Signed 2018-12-27 oeuvre de l’intégration 06 12 25 08 régionale des centres de recherche et aux services d’appui et gestion du projet ZR-MINAGRI-78983-CS- CDS / Contractualusation Agriculture Value Chain 2019-01- 2019-03- 2019-01- 2019-09- avec VSF pour l'appui à la IDA / 58520 Prior Direct Selection Direct 3,000,000.00 3,437,132.00 Under Review 2018-12-28 Development 07 13 29 09 mise en œuvre de la chaine de valeur élevage laitier ZR-MINAGRI-78877-CS- CDS / Assistance technique Agriculture Value Chain 2019-01- 2019-03- 2019-07- 2019-09- IDA / 58520 Prior Direct Selection Direct 2,000,000.00 2,000,000.00 Signed 2018-12-29 de la FAO pour la chaîne de Development 08 14 01 10 valeur peche et aquaculture ZR-MINAGRI-78658-CS- Individual INDV / Recrutement d'un Support Services and Project Under 2019-07- 2019-02- 2019-03- 2019-04- 2019-10- IDA / 58520 Post Consultant Open 120,000.00 0.00 2018-12-30 spécialiste national en Management Implementation 25 17 10 14 11 Selection nutrition ZR-MINAGRI-78876-CS- Individual INDV / Recrutement d'un Support Services and Project Under 2019-07- 2019-02- 2019-03- 2019-04- 2019-10- IDA / 58520 Post Consultant Open 120,000.00 0.00 2018-12-31 spécialiste en gestion des Management Implementation 25 18 11 15 12 Selection savoirs ZR-MINAGRI-79098-CS- CDS / Maitrise d'Ouvrage Délégué avec UNOPS pour le Agriculture Value Chain 2018-10- 2018-12- 2018-10- 2019-06- Développement IDA / 58520 Prior Direct Selection Direct 38,000,000.00 38,000,000.00 Signed 2018-10-02 Development 12 16 18 14 d'infrastructures proritaires en appui aux chaines de valeur sélectionnées  MOF-REF-21 / Recrutement Individual Support Services and Project 2018-09- 2018-10- 2018-11- 2019-05- d'un spécialiste en suivi et IDA / 58520 Prior Consultant Limited 240,000.00 0.00 Canceled 2018-09-23 Management 28 19 23 22 évaluation en faveur de Selection l'UNCP Individual MOF-REF-22 / Recrutement Support Services and Project 2018-11- 2018-12- 2019-01- 2019-07- IDA / 58520 Prior Consultant Open - National 240,000.00 0.00 Canceled 2018-09-23 d'un auditeur interne Management 11 02 06 05 Selection ZR-MINAGRI-78879-CS- Individual INDV / Recrutement d'un Support Services and Project Pending 2018-08- 2018-08- 2018-09- 2019-03- IDA / 58520 Prior Consultant Open 210,000.00 0.00 2018-06-14 Chargé de Passation des Management Implementation 02 23 27 26 Selection Marchés en faveur de l'UNCP ZR-MINAGRI-79003-CS- INDV / Recrutement de deux Individual Support Services and Project Pending 2016-09- 2016-10- 2016-11- 2017-05- coordonnateurs provinciaux IDA / 58520 Prior Consultant Open 500,000.00 0.00 2016-08-09 Management Implementation 27 18 22 21 pour les UPEP Sud Kivu et Selection Tanganyika ZR-MINAGRI-79009-CS- INDV / Recrutement Individual Support Services and Project Pending 2016-09- 2016-10- 2016-11- 2017-05- spécialistes provinciaux en IDA / 58520 Post Consultant Open 400,000.00 0.00 2016-08-09 Management Implementation 27 18 22 21 suivi et évaluation pour les Selection UPEP Sud Kivu et Tanganyika ZR-MINAGRI-79142-CS- INDV / Recrutement de deux Individual Support Services and Project Under 2019-07- 2018-11- 2018-11- 2019-01- 2019-07- experts en charge de IDA / 58520 Prior Consultant Open 400,000.00 0.00 2018-09-20 Management Implementation 25 08 29 03 02 l'agronomie et de la Selection recherche appliquée ZR-MINAGRI-78660-CS- Individual INDV / Recrutement de deux Support Services and Project Under 2019-07- 2018-11- 2018-11- 2019-01- 2019-07- IDA / 58520 Prior Consultant Open 400,000.00 0.00 2018-09-21 experts en travaux de génie Management Implementation 25 09 30 04 03 Selection civil Page 9 ZR-MINAGRI-78666-CS- Individual INDV / Recrutement de deux Support Services and Project 2018-12- 2018-12- 2019-02- 2019-08- IDA / 58520 Prior Consultant Open 400,000.00 0.00 Canceled 2018-10-22 spécialistes en Management 10 31 04 03 Selection développement du secteur privé ZR-MINAGRI-78965-CS- Individual INDV / Recrutement de deux Support Services and Project Pending 2016-09- 2016-10- 2016-11- 2017-05- IDA / 58520 Post Consultant Open 400,000.00 0.00 2016-08-09 spécialistes provinciaux en Management Implementation 27 18 22 21 Selection passation des marchés ZR-MINAGRI-78889-CS- Individual Support Services and Project Pending 2016-08- 2016-09- 2016-10- 2017-04- INDV / Recrutement de deux IDA / 58520 Post Consultant Limited 360,000.00 0.00 2016-08-09 Management Implementation 14 04 09 07 comptables provinciaux Selection ZR-MINAGRI-78812-CS- INDV / Recrutement de deux Individual Support Services and Project Pending 2016-09- 2016-10- 2016-11- 2017-05- spécialistes provinciaux en IDA / 58520 Post Consultant Open 360,000.00 0.00 2016-08-09 Management Implementation 27 18 22 21 sauvegarde Selection environnementale et sociale ZR-MINAGRI-78813-CS- Individual INDV / Recrutement d'un Support Services and Project Under 2019-07- 2018-11- 2018-12- 2019-01- 2019-07- IDA / 58520 Prior Consultant Open 210,000.00 0.00 2018-09-26 spécialiste national en Management Implementation 25 14 05 09 08 Selection sauvegarde environnementale ZR-MINAGRI-79116-CS- Individual INDV / Recrutement d'un Support Services and Project Pending 2018-11- 2018-12- 2019-01- 2019-07- IDA / 58520 Post Consultant Open 210,000.00 0.00 2018-09-27 spécialiste national en Management Implementation 15 06 10 09 Selection sauvegarde sociale ZR-MINAGRI-78891-CS- Individual INDV / Recrutement de deux Support Services and Project Pending 2018-11- 2018-12- 2019-01- 2019-07- IDA / 58520 Post Consultant Open 210,000.00 0.00 2018-09-28 assistants provinciaux en Management Implementation 16 07 11 10 Selection communication ZR-MINAGRI-79172-CS- Individual INDV / Recrutement d'un Support Services and Project Under 2019-07- 2018-11- 2018-11- 2019-01- 2019-07- IDA / 58520 Prior Consultant Open 210,000.00 0.00 2018-09-19 expert en gestion de Projet Management Implementation 25 07 28 02 01 Selection en faveur de l'UNCP ZR-MINAGRI-79012-CS- CDS / Recrutement d'un Support Services and Project Pending 2018-10- 2018-12- 2019-06- IDA / 58520 Post Direct Selection Direct 60,000.00 0.00 2018-10-02 consultant individuel pour la Management Implementation 12 16 14 mise en place du tableau de bord ZR-MINAGRI-79018-CS- INDV / Recrutement d'un consultant individuel pour Individual Agriculture Value Chain Under 2019-07- 2018-12- 2018-12- 2019-02- 2019-08- l'élaboration du plan d'action IDA / 58520 Post Consultant Limited 40,000.00 0.00 2018-12-05 Development Implementation 13 10 31 04 03 en faveur des populations Selection autochtones dans l'aire d'intervention du PICAGL ZR-MINAGRI-79166-CS- CDS / Protocole d'accord Support for the development avec ANAPI pour Pending 2019-01- 2019-03- 2019-09- IDA / 58520 of the private agro- Post Direct Selection Direct 100,000.00 0.00 2018-12-26 l'amélioration du climat d' Implementation 05 11 07 industrial sector affaires dans l'aire d'intervention du PICAGL au Sud Kivu et Tanganyika ZR-MINAGRI-78814-CS- CDS / Protocole d'accord Agriculture Value Chain Pending 2018-10- 2018-12- 2019-06- avec SENASEM pour IDA / 58520 Post Direct Selection Direct 350,000.00 0.00 2018-09-28 Development Implementation 08 12 10 l'inspection, contrôle et certification des semences dans l'aire du Projet ZR-MINAGRI-79117-CS- Individual INDV / Recrutement d'un Support Services and Project 2018-10- 2018-12- 2018-11- 2019-01- 2018-11- 2019-02- 2018-12- 2019-08- IDA / 58520 Post Consultant Open 12,000.00 12,000.00 Signed 2018-10-31 Caissier pour l'UPEP PICAGL Management 11 19 20 09 28 13 07 12 Selection Sud-Kivu ZR-MINAGRI-78908-CS- Individual INDV / Recrutement d'un Support Services and Project Pending 2018-12- 2019-01- 2019-02- 2019-08- IDA / 58520 Post Consultant Open 12,000.00 0.00 2018-10-31 Assistant en communition Management Implementation 19 09 13 12 Selection pour l'UPEP PICAGL Sud-Kivu ZR-MINAGRI-79120-CS- Individual INDV / Recrutement d'un Support Services and Project 2018-12- 2019-01- 2018-11- 2019-02- 2018-12- 2019-08- IDA / 58520 Post Consultant Open 12,000.00 12,000.00 Signed 2018-10-31 Secrétaire l'UPEP PICAGL Sud- Management 19 09 30 13 07 12 Selection Kivu ZR-MINAGRI-78991-CS- Individual INDV / Recrutement d'un Support Services and Project 2018-10- 2018-12- 2019-01- 2018-11- 2019-02- 2018-12- 2019-08- IDA / 58520 Post Consultant Open 12,000.00 12,000.00 Signed 2018-10-31 Assistant de logistique pour Management 11 19 09 28 13 07 12 Selection l'UPEP PICAGL Sud-Kivu ZR-MINAGRI-78910-CS- Individual INDV / Recrutement d'un Support Services and Project Under 2019-02- 2018-12- 2019-01- 2019-02- 2019-08- IDA / 58520 Post Consultant Open 9,000.00 0.00 2018-10-31 Chauffeur complémentaire Management Implementation 07 19 09 13 12 Selection pour l'UPEP PICAGL Sud-Kivu ZR-MINAGRI-79132-CS- Individual INDV / Recrutement d'un Support Services and Project 2018-12- 2019-01- 2019-01- 2019-02- 2019-01- 2019-08- IDA / 58520 Post Consultant Open 12,000.00 12,000.00 Signed 2018-10-31 caissier pour l'UPEP PICAGL Management 19 09 07 13 07 12 Selection Tanganyika ZR-MINAGRI-78976-CS- INDV / Recrutement d'un Individual Support Services and Project Pending 2018-11- 2018-11- 2018-12- 2019-06- assistant en communition IDA / 58520 Post Consultant Limited 12,000.00 0.00 2018-10-31 Management Implementation 05 26 31 29 pour l'UPEP PICAGL Selection Tanganyika ZR-MINAGRI-78995-CS- Individual INDV / Recrutement d'un Support Services and Project 2018-10- 2018-11- 2018-12- 2018-11- 2019-01- 2018-12- 2019-01- 2019-06- IDA / 58520 Post Consultant Limited 12,000.00 12,000.00 Signed 2018-10-31 secrétaire l'UPEP PICAGL Management 11 05 26 26 07 31 07 29 Selection Tanganyika ZR-MINAGRI-79136-CS- Individual INDV / Recrutement d'un Support Services and Project 2018-12- 2019-01- 2018-12- 2019-02- 2019-01- 2019-08- IDA / 58520 Post Consultant Open 12,000.00 12,000.00 Signed 2018-10-31 assistant de logistique pour Management 19 09 28 13 07 12 Selection l'UPEP PICAGL Tanganika ZR-MINAGRI-78882-CS- INDV / Recrutement d'un Individual Support Services and Project Under 2019-02- 2018-12- 2019-01- 2019-02- 2019-08- chauffeur complémentaire IDA / 58520 Post Consultant Open 9,000.00 0.00 2018-10-31 Management Implementation 07 19 09 13 12 pour l'UPEP PICAGL Selection Tanganyika ZR-MINAGRI-79000-CS- INDV / Recrutement d'un Délégué à pied d'œuvre pour Individual Support Services and Project 2019-03- 2019-01- 2019-05- 2019-01- 2019-06- 2019-02- 2019-06- 2019-08- le contrôle et surveillance IDA / 58520 Post Consultant Open 10,000.00 6,000.00 Signed 2018-11-15 Management 15 03 16 24 06 28 06 27 des travaux de réhabilitation Selection du bureau du Ministre Provincial de l'Agriculture du Tanganyika ZR-MINAGRI-79096-CS- Individual Support Services and Project Pending 2018-08- 2018-08- 2018-09- 2019-03- INDV / Recrutement d'un IDA / 58520 Post Consultant Open 180,000.00 0.00 2018-06-14 Management Implementation 02 23 27 26 comptable national Selection ZR-MINAGRI-78986-CS- CDS / Contractualisation avec STUDI INTERNATIONAL Agriculture Value Chain Under 2019-10- 2018-10- 2018-12- 2019-06- pour la mise à jour des IDA / 58520 Post Direct Selection Direct 120,000.00 0.00 2018-09-30 Development Implementation 18 10 14 12 documents de sauvegarde environnementale et social du PICAGL ZR-MINAGRI-79173-CS- CDS / Contractualisation avec le consortium UCB, Agriculture Value Chain Pending 2018-10- 2018-12- 2019-06- UEA, INERA et SENASEM pour IDA / 58520 Post Direct Selection Direct 170,000.00 0.00 2018-09-23 Development Implementation 03 07 05 la sélection participative des variétés de riz dans la province de Tanganyika ZR-MINAGRI-79014-CS- CDS / Contractualisation Support Services and Project 2018-10- 2018-12- 2019-01- 2019-06- avec SAPHIR IDA / 58520 Post Direct Selection Direct 120,000.00 96,786.00 Signed 2018-10-04 Management 14 18 15 16 DEVELOPPEMENT pour le recrutement du personnel complémentaire de PICAGL ZR-MINAGRI-78988-CS- CDS / Protocole d'accord avec l'INERA pour la Agriculture Value Chain Pending 2018-10- 2018-12- 2019-06- IDA / 58520 Post Direct Selection Direct 350,000.00 0.00 2018-09-27 production des semences Development Implementation 07 11 09 des variétés améliorées dans l'aire du Projet ZR-MINAGRI-105382-CS- CDS / Recrutement de deux délégués à pied d'œuvre pour la surveillance des Support Services and Project 2019-07- 2019-05- 2019-09- 2019-07- 2019-11- 2020-01- IDA / 58520 Post Direct Selection Direct 50,000.00 49,695.00 Signed 2019-05-03 travaux de réhabilitation des Management 08 13 10 17 15 13 bâtiments des inspections provinciales de l'Agriculture du Sud Kivu et Tanganyika ZR-MINAGRI-105304-CS- CDS / Contractualisation avec SAPHIR Support Services and Project 2019-07- 2018-10- 2019-09- 2018-12- 2020-01- 2019-02- IDA / 58520 Post Direct Selection Direct 80,000.00 9,456,960.00 Signed 2018-10-04 DEVELOPPEMENT pour le Management 21 14 13 18 31 01 développement des compétences des ressources humaines du Projet PICAGL ZR-MINAGRI-105356-CS- Individual INDV / Recrutement d'un Support Services and Project Under 2019-07- 2019-03- 2019-04- 2019-05- 2020-05- IDA / 58520 Post Consultant Open 40,000.00 0.00 2019-01-21 logisticien pour l'UNCP Management Implementation 25 11 01 06 05 Selection PICAGL ZR-MINAGRI-105386-CS- INDV / Recrutement d'un Individual Consultant individuel pour Support Services and Project Pending 2019-06- 2019-07- 2019-08- 2020-02- IDA / 58520 Post Consultant Open 35,000.00 0.00 2019-05-06 l'élaboration du guide Management Implementation 24 15 19 15 Selection environnemental du volet végétal de PICAGL Page 10 ZR-MINAGRI-105396-CS- INDV / Recrutement d'un Individual Support Services and Project Pending 2019-04- 2019-05- 2019-06- 2019-12- Consultant individuel pour la IDA / 58520 Post Consultant Limited 35,000.00 0.00 2019-04-06 Management Implementation 11 02 06 03 sensibilisation aux enjeux Selection environnementaux MOF-REF-120 / Individual Recrutement d'un chauffeur Support Services and Project Pending 2019-03- 2019-03- 2019-04- 2020-04- IDA / 58520 Post Consultant Limited 9,000.00 0.00 2019-02-25 complémentaire pour l'UPEP Management Implementation 02 23 27 26 Selection PICAGL Sud-Kivu ZR-MINAGRI-105399-CS- INDV / Recrutement d"un consultant chargé des Individual études techniques et Support Services and Project Under 2019-10- 2019-07- 2019-07- 2019-09- 2020-02- IDA / 58520 Post Consultant Open 25,000.00 0.00 2019-05-20 surveillance des travaux de Management Implementation 08 08 29 02 29 Selection réhabilitation du Ministère et le bâtiments devant abriter provisoirement l’IPAPEL Sud Kivu ZR-MINAGRI-117752-CS- INDV / Recrutement d'un Individual Agriculture Value Chain Under 2019-07- 2019-09- 2019-09- 2019-10- 2021-12- Spécialiste en Agribusiness IDA / 58520 Post Consultant Open 96,000.00 0.00 2019-07-15 Development Implementation 08 02 23 28 31 et développement de chaînes Selection de valeur ZR-MINAGRI-117753-CS- Individual INDV / Recrutement d'un Agriculture Value Chain Under 2019-07- 2019-09- 2019-10- 2019-11- 2021-12- IDA / 58520 Post Consultant Open 96,000.00 0.00 2019-07-24 Spécialiste en Finance Rurale Development Implementation 08 11 02 06 31 Selection pour le secteur agricole ZR-MINAGRI-105103-CS- INDV / Recrutement d'un consultant individuel pour Individual Support Services and Project 2019-06- 2019-06- 2019-07- 2020-01- l'élaboration du plan d'action IDA / 58520 Post Consultant Open 40,000.00 0.00 Canceled 2019-04-17 Management 05 26 31 27 en faveur des populations Selection autochtones dans l'aire d'intervention du PICAGL ZR-MINAGRI-78904-CS- INDV / Recrutement d'un Individual Support Services and Project 2018-11- 2018-12- 2019-01- 2019-07- consultant individuel pour IDA / 58520 Post Consultant Open 40,000.00 0.00 Canceled 2018-10-06 Management 24 15 19 18 l'élaboration du manuel Selection d'accès au crédit ZR-MINAGRI-122621-CS- CDS / Recrutement de Support for the development Under 2019-07- 2019-08- 2019-10- 2020-04- Monsieur Ibrahim Dione IDA / 58520 of the private agro- Post Direct Selection Direct 40,000.00 0.00 2019-07-31 Implementation 25 10 14 11 pour l'élaboration du manuel industrial sector d'accès au crédit ZR-MINAGRI-122617-CS- CDS / Recrutement de l'IFPRI Agriculture Value Chain 2019-08- 2019-08- 2019-11- 2019-10- 2020-12- 2020-04- IDA / 58520 Prior Direct Selection Direct 500,000.00 452,114.90 Signed 2019-07-31 pour la réalisation de l' étude Development 28 10 05 14 15 11 de référence du PICAGL ZR-MINAGRI-140233-CS- CDS / Etude de faisabilité d'un plan d'opération de d'un Support for the development plan d'aménagement d'un Under 2019-11- 2019-11- 2020-03- 2020-01- 2020-07- IDA / 58520 of the private agro- Prior Direct Selection Direct 1,200,000.00 0.00 2019-10-30 parc agroindustriel dans la Implementation 30 09 20 13 11 industrial sector plaine de Rugumba dans le territoire de Kaliémie dans la Province de Tanganyika avec ONUDI ZR-MINAGRI-140238-CS- CDS / Réalisation de la Agriculture Value Chain Under 2019-12- 2019-11- 2020-01- 2020-07- cartographie des sols sur le IDA / 58520 Post Direct Selection Direct 120,000.00 0.00 2019-10-30 Development Implementation 15 09 13 11 corridor Bukavu -Kalemie avec IITA ZR-MINAGRI-148116-CS- CDS / Réalisation des études techniques, d'impacts environnemental et social Agriculture Value Chain Under 2019-12- 2019-12- 2020-03- 2020-08- des travaux de construction IDA / 58520 Post Direct Selection Direct 150,000.00 0.00 2019-12-20 Development Implementation 14 30 04 31 de la microcentrale hydroélectrique de MUTSUVA dans le territoire de KABARE, Province du SUD-KIVU avec STUCKY SA ZR-MINAGRI-148122-CS- INDV / Recrutement d'un Individual Responsable Provincial de Support Services and Project 2019-12- 2020-01- 2020-08- 2020-02- 2020-08- 2020-03- 2020-10- 2020-09- IDA / 58520 Post Consultant Limited 90,000.00 42,000.00 Signed 2020-01-15 Suivi et Évaluation pour Management 14 20 26 10 28 16 28 12 Selection l'Unité Provinciale d'Exécution de Tanganyika ZR-MINAGRI-148125-CS- INDV / Recrutement d'un Individual chargé de Passation des Support Services and Project Under 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 58520 Post Consultant Limited 90,000.00 0.00 2020-01-15 Marchés pour l'Unité Management Implementation 14 20 10 16 12 Selection Provinciale d'Exécution du Projet Sud Kivu ZR-MINAGRI-157206-CS- CDS / Recrutement de M. ISSA DRAME pour le renforcement des capacités des acteurs impliqués dans Support Services and Project Under 2020-02- 2020-03- 2020-05- 2020-11- la mise en œuvre du projet IDA / 58520 Post Direct Selection Direct 35,000.00 0.00 2020-02-20 Management Implementation 07 01 05 01 en suivi-évaluation et rapportage et l’appui à l’élaboration du rapport de la mission conjointe de supervision du PICAGL ZR-MINAGRI-170568-CS- INDV / Recrutement d'un consultant individuel pour la Individual réalisation des études Support Services and Project Pending 2020-08- 2020-09- 2020-10- 2021-04- IDA / 58520 Post Consultant Limited 8,000.00 0.00 2020-08-15 techniques des travaux de Management Implementation 20 10 15 13 Selection construction du laboratoire du SENASEM et INERA Tanganyika ZR-MINAGRI-169817-CS- INDV / Recrutement d'un Délégué à Pied d'Oeuvre pour Individual le contrôle et la surveillance Support Services and Project Pending 2020-08- 2020-09- 2020-10- 2021-04- IDA / 58520 Post Consultant Limited 12,000.00 0.00 2020-08-15 des travaux de construction Management Implementation 20 10 15 13 Selection de deux (2) laboratoires du SENASEM et de l'INERA Tanganyika ZR-MINAGRI-169895-CS- INDV / Recrutement consultant pour la traduction Individual Support Services and Project Pending 2020-08- 2020-09- 2020-10- 2021-04- du guide de bonnes IDA / 58520 Post Consultant Limited 3,000.00 0.00 2020-08-10 Management Implementation 15 05 10 08 pratiques environnementales Selection et sociales du PICAGL en swahili en faveur de l'UPEP Tanganyika ZR-MINAGRI-169847-CS- INDV / Recrutement Individual Support Services and Project Pending 2020-07- 2020-07- 2020-07- 2020-07- consultant pour infographie IDA / 58520 Post Consultant 8,000.00 0.00 2020-07-10 Management Implementation 10 10 10 10 du Guide Selection environnemental/Tanganyika ZR-MINAGRI-169821-CS- INDV / Recrutement d'un délégué à pied d'œuvre (DPO) pour le contrôle et Individual surveillance des travaux de Support Services and Project Pending 2020-05- 2020-06- 2020-07- 2021-01- IDA / 58520 Post Consultant Limited 8,000.00 0.00 2020-05-20 réhabiitation du bâtiment Management Implementation 25 15 20 16 Selection complémentaire de l'Inspection Provinciale de l'Agriculture, Pêche et Elevage de la province du Sud Kivu ZR-MINAGRI-185889-CS- CDS / Recrutement du bureau d'études INTAIRPLAN Support Services and Project Under 2020-10- 2020-08- 2020-11- 2020-12- Gmb H pour la revue des IDA / 58520 Post Direct Selection Direct 60,000.00 0.00 2020-08-20 Management Implementation 13 30 03 18 études techniques de travaux de réhabilitation de routes de desserte agricole ZR-MINAGRI-188541-CS- INDV / Recrutement d'un Délégué à Pied d'Œuvre (DPO) pour la surveillance et le contrôle des travaux de Individual Agriculture Value Chain Under 2020-09- 2020-11- 2020-12- 2021-01- 2021-07- construction de 6 dépôts de IDA / 58520 Post Consultant Open 12,000.00 0.00 2020-10-01 Development Implementation 30 19 10 14 13 stockage dont deux (02) à Selection Rugumba, deux (02) à Lwaminwa et deux (02) à Katibili dans la Province de Tanganyika ZR-MINAGRI-188506-CS- INDV / Recrutement d'un Délégué à Pied d'Oeuvre pour la surveillance et le contrôle Individual Agriculture Value Chain Under 2020-09- 2020-11- 2020-12- 2021-01- 2021-07- des travaux de construction IDA / 58520 Post Consultant Open 12,000.00 0.00 2020-10-02 Development Implementation 29 20 11 15 14 de 10 Bâtiments devant Selection abriter les unités de transformation de manioc dans la Province de Tanganyika ZR-MINAGRI-188518-CS- INDV / Recrutement d'un Délégué à Pied d'Oeuvre pour la surveillance et le contrôle des travaux de construction Individual Agriculture Value Chain 2021-01- 2020-11- 2020-12- 2021-01- 2021-07- de 6 Bâtiments devant abriter IDA / 58520 Post Consultant Open 12,000.00 0.00 Under Review 2020-10-03 Development 28 21 12 16 15 les équipements de Selection transformation de Riz dans les six Bassins de production dans la Province de Tanganyika Page 11 ZR-MINAGRI-188546-CS- INDV / Recrutement d'un Délégué à Pied d'Oeuvre pour la surveillance et le contrôle Individual Agriculture Value Chain Pending 2020-11- 2020-12- 2021-01- 2021-07- des travaux de construction IDA / 58520 Post Consultant Open 12,000.00 0.00 2020-10-04 Development Implementation 22 13 17 16 de 10 bâtiments devant Selection abriter les unités de transformation de maïs dans la Province de Tanganyika ZR-MINAGRI-188527-CS- INDV / Recrutement d'un Délégué à Pied d'Ouevre pour le contrôle et la surveillance Individual Agriculture Value Chain Pending 2020-12- 2021-01- 2021-02- 2021-08- travaux de construction de 2 IDA / 58520 Post Consultant Open 12,000.00 0.00 2020-10-25 Development Implementation 13 03 07 06 dépôts vétérinaires et 2 Selection cliniques vétérinaires dans les bassins de la Rugumba et Lwamina, territoire de Kalemie ZR-MINAGRI-188525-CS- INDV / Recrutement d'un Délégué à Pied d'Ouevre (DPO) pour le contrôle et la Individual Agriculture Value Chain Under 2020-09- 2020-12- 2021-01- 2021-02- 2021-08- surveillance des travaux de IDA / 58520 Post Consultant Open 12,000.00 0.00 2020-10-26 Development Implementation 30 14 04 08 07 construction de huit (08) Selection mini laiteries dans les six bassins de production, territoire de Kalemie ZR-MINAGRI-188484-CS- INDV / Recrutement d'un Délégué à Pied d'Oeuvre (DPO) pour le contrôle et la surveillance des travaux de Individual Agriculture Value Chain Under 2020-09- 2020-12- 2021-01- 2021-02- 2021-08- construction de deux (02) IDA / 58520 Post Consultant Open 6,000.00 0.00 2020-10-27 Development Implementation 30 15 05 09 08 cliniques vétérinaires dans Selection les bassins de production de la Rugumba et Lwamina, territoire de Kalemie/Tanganyika ZR-MINAGRI-188538-CS- INDV / Recrutement d'un Délégué à Pied d'Œuvre Individual (DPO) pour le contrôle et la Agriculture Value Chain Pending 2020-12- 2021-01- 2021-02- 2021-08- IDA / 58520 Post Consultant Open 6,000.00 0.00 2020-10-28 surveillance des travaux de Development Implementation 16 06 10 09 Selection construction de deux (02) dépôts vétérinaires dans la ville de Kalemie/Tanganyika ZR-MINAGRI-188524-CS- INDV / Recrutement Individual consultant pour la traduction Support Services and Project Pending 2020-08- 2020-09- 2020-10- 2021-04- IDA / 58520 Post Consultant Limited 3,000.00 0.00 2020-08-21 du guide de bonnes Management Implementation 26 16 21 19 Selection pratiques environnementales et sociales du PICAGL en swahili/Sud Kivu ZR-MINAGRI-188869-CS- CDS / Contractualisation avec Monsieur Freddy KAPIAMBA WA KAPIAMBA pour le contrôle des travaux Support Services and Project Under 2020-12- 2020-09- 2020-11- 2021-05- complémentaires de IDA / 58520 Post Direct Selection Direct 14,000.00 0.00 2020-09-15 Management Implementation 11 25 29 28 Réhabilitation du bâtiment devant servir des bureaux des Inspections Provinciales de l’Agriculture et du Développement Rural de Tanganyika ZR-MINAGRI-188911-CS- CDS / Contractualisation avec Monsieur Mabel LUBEMBE NZUNGA pour le contrôle et la surveillance Support Services and Project Pending 2020-09- 2020-12- 2021-05- des Travaux IDA / 58520 Post Direct Selection Direct 14,000.00 0.00 2020-09-17 Management Implementation 27 01 30 complémentaires de réhabilitation du bâtiment des bureaux des Inspections Provinciales de l’Agriculture, Pêche, Elevage et Développent Rural du Sud Kivu ZR-MINAGRI-188912-CS- CDS / Contractualisation avec Monsieur MASEMBE WASIKATENDA Samy pour le contrôle et la surveillance Support Services and Project Pending 2020-09- 2020-12- 2021-05- des travaux de réhabilitation IDA / 58520 Post Direct Selection Direct 14,000.00 0.00 2020-09-17 Management Implementation 27 01 30 des bureaux du Ministère Provincial de l’Agriculture, Pêche, Elevage et Développement Rural du Sud- Kivu ZR-MINAGRI-189089-CS- CDS / Contractualisation Support Services and Project Under 2020-11- 2020-09- 2020-11- 2021-05- avec Monsieur IBRAHIMA IDA / 58520 Post Direct Selection Direct 16,000.00 0.00 2020-09-15 Management Implementation 08 25 29 28 DIONE pour la mise à jour du tableau de bord du Projet PICAGL ZR-MINAGRI-188459-CS- CDS / Contractualisation avec la firme Zuid Oost Azië Support Services and Project 2020-11- 2021-01- 2021-07- IDA / 58520 Prior Direct Selection Direct 500,000.00 0.00 Under Review 2020-10-29 (ZOA) pour la gestion des Management 08 12 11 conflits et questions foncières dans la zone d'intervention du PICAGL ZR-MINAGRI-196112-CS- INDV / Recrutement d'un Délégué à Pied d'Œuvre pour Individual Agriculture Value Chain 2020-10- 2020-12- 2020-12- 2021-01- 2021-07- la surveillance et le contrôle IDA / 58520 Post Consultant Open 12,000.00 0.00 Under Review 2020-10-15 Development 28 03 24 28 27 des travaux de construction Selection du Laboratoire du SENASEM du Tanganyika ZR-MINAGRI-196113-CS- INDV / Recrutement d'un Délégué à Pied d'Œuvre pour Individual Agriculture Value Chain 2020-10- 2020-12- 2020-12- 2021-01- 2021-07- la surveillance et le contrôle IDA / 58520 Post Consultant Open 12,000.00 0.00 Under Review 2020-10-15 Development 28 03 24 28 27 des travaux de construction Selection du Laboratoire de l'INERA du Tanganyika ZR-MINAGRI-199487-CS- CDS / Mission d' appui à l’UNCP dans la mise en œuvre des activités du Support Services and Project 2020-10- 2020-10- 2020-10- 2020-12- 2020-10- 2021-06- PICAGL(Appui à l'élaboration IDA / 58520 Post Direct Selection Direct 75,000.00 74,450.00 Signed 2020-10-16 Management 19 26 20 30 21 28 du rapport à mi-parcours et d'activités) et l' élaboration du rapport d’achèvement du PARRSA -FA avec Monsieur ISSA DRAME ZR-MINAGRI-203023-CS- INDV / Recrutement d'un Individual Support Services and Project Under 2021-01- 2020-12- 2020-12- 2021-01- 2021-07- Responsable Provincial en IDA / 58520 Post Consultant Limited 42,000.00 0.00 2020-11-30 Management Implementation 09 05 26 30 29 sauvegarde Selection environnementale et sociale de l'UPEP Sud Kivu ZR-MINAGRI-203024-CS- INDV / Recrutement d'un Délégué à pied d'oeuvre pour Individual la surveillance et contrôle Agriculture Value Chain Pending 2020-12- 2021-01- 2021-02- 2021-08- IDA / 58520 Post Consultant Limited 12,000.00 0.00 2020-12-09 des travaux de réhabilitation Development Implementation 14 04 08 07 Selection des travaux du bâtiment du Secrétariat Général de Pêche et Elevage à Kinshasa ZR-MINAGRI-209981-CS- CDS / Contractualisation avec Monsieur MASEMBE WASIKATENDA Samy, Délégué à Pied d’Œuvre pour Support Services and Project Pending 2020-12- 2021-03- 2021-09- le contrôle et la surveillance IDA / 58520 Post Direct Selection Direct 6,000.00 0.00 2020-12-20 Management Implementation 30 05 01 des travaux de la clôture et aménagement extérieur des Bureaux du Ministère Provincial de l’Agriculture, Elevage, Pêche du Sud-Kivu ZR-MINAGRI-210123-CS- INDV / Recrutement d'un Délégué à Pied d'Œuvre pour la surveillance et le contrôle des Travaux de construction Individual Agriculture Value Chain 2021-06- 2021-03- 2021-03- 2021-04- 2021-10- de quatre (04) boutiques IDA / 58520 Post Consultant Open 12,000.00 0.00 Under Review 2021-01-15 Development 16 05 26 30 27 d'intrants agricoles dans les Selection Bassins de production de Rugumba, Lwaminwa, Kabimba et Kalemie dans la Province de Tanganyika ZR-MINAGRI-210124-CS- INDV / Recrutement d'un Délégué à Pied d'Œuvre (DPO) pour la surveillance et Individual le contrôle des Travaux de Agriculture Value Chain Pending 2021-03- 2021-04- 2021-05- 2021-11- IDA / 58520 Post Consultant Open 8,000.00 0.00 2021-01-22 construction de deux (02) Development Implementation 12 02 07 03 Selection provenderies dans les Bassins de production de Rugumba et Lwaminwa dans la Province de Tanganyika ZR-MINAGRI-210137-CS- INDV / Recrutement d'un (1) délégué à pied d'oeuvre pour la mission de controle et Individual surveillance des Travaux de Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-27 construction de quatre (4) Development 26 01 22 29 25 Selection Centres de Collecte et Transformation de Manioc à Bitale, Bulmbika et Mulonge, dans le territoire de Kalehe Page 12 ZR-MINAGRI-210139-CS- INDV / Recrutement d'un (1) délégué à pied d'oeuvre pour la mission de controle et surveillance des Travaux de Individual Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- construction de quatre (4) IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-27 Development 26 01 22 29 25 Centres de Collecte et Selection Transformation de Manioc à Mubuku, Karasi, Kitchanga et Maibano, dans le territoire de Kalehe ZR-MINAGRI-210134-CS- INDV / Recrutement d'un (1) délégué à pied d'oeuvre pour la mission de controle et Individual surveillance des Travaux de Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-27 construction de deux (2) Development 26 01 22 29 25 Selection Centres de Collecte et Transformation de Manioc à Katanga et Malinde, dans le territoire de Fizi ZR-MINAGRI-210133-CS- INDV / Recrutement d'un (1) délégué à pied d'oeuvre pour la mission de controle et Individual surveillance des Travaux de Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-27 construction de cinq (5) Development 26 01 22 29 25 Selection Centres de Collecte et Transformation de Manioc à Katana, Kavumu et Luhihi, dans le territoire de Kabare ZR-MINAGRI-210135-CS- INDV / Recrutement d'un (1) délégué à pied d'oeuvre pour la mission de controle et Individual surveillance des Travaux de Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-27 construction de trois (3) Development 26 01 22 29 25 Selection Centres de Collecte et Transformation de Manioc à Sange, Kiliba et Runingu, dans le territoire d’Uvira ZR-MINAGRI-210138-CS- INDV / Recrutement d'un (1) délégué à pied d'oeuvre pour la mission de controle et surveillance des Travaux de Individual Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- construction de quatre (4) IDA / 58520 Post Consultant Limited 6,000.00 0.00 Under Review 2021-01-27 Development 26 01 22 29 25 Centres de Collecte et Selection Transformation de Manioc à Kamanyola, Luvungi et Lubarika, dans la plaine de Ruzizi ZR-MINAGRI-210214-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des Travaux de construction de 2 mini Individual Support Services and Project Pending 2021-01- 2021-02- 2021-03- 2021-09- laboratoires de SENASEM à IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-01-25 Management Implementation 30 20 27 23 Bwegera et Fizi, d’1 mur de Selection clôture et aménagement paillasses salle de labo physique et phytopathologie au SENASEM Bukavu ZR-MINAGRI-210331-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la mission de contrôle et surveillance des Travaux de Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- construction des aires de IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-03 Development Implementation 08 01 05 02 sechage semi ouverts dans le Selection groupement de Bushumba (territoire de Kabare) et le groupement d'Itara (territoire d'Uvira) ZR-MINAGRI-210333-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la mission de contrôle et Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- surveillance des Travaux de IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-03 Development Implementation 08 01 05 02 construction des aires de Selection sechage non couverts à Sebele dans le territoire de Fizi et à Uvira ZR-MINAGRI-210661-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des Travaux Individual Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- de construction de 7 abris IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-29 Development 26 03 24 31 27 dont 6 pour mini-minoterie Selection et 1 pour mini-laiterie de type 2, et d'une provenderie, dans le territoire de Kabare ZR-MINAGRI-210658-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des Travaux Individual de construction de 16 abris Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-29 dont 12 pour mini- Development 26 03 24 31 27 Selection minoterie, 3 pour rizerie type 2 et 1 pour mini- laiterie de type 2, et d'une provenderie, dans la plaine de Ruzizi ZR-MINAGRI-210662-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour Individual la surveillance des Travaux Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-29 de construction de 4 abris Development 26 03 24 31 27 Selection dont 1 pour mini-minoterie et 3 pour mini-laiterie de type 2, dans le territoire de Kalehe ZR-MINAGRI-210659-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des Travaux Individual de construction de 10 abris Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-29 dont 8 pour mini-minoterie, Development 26 03 24 31 27 Selection 1 pour rizerie de type 2 (SB- 50 ou équivalent) et 1 pour mini-laiterie de type 2, dans le territoire de Fizi ZR-MINAGRI-210660-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour Individual le contrôle et la surveillance Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-29 des Travaux de construction Development 26 03 24 31 27 Selection de 2 abris pour mini-laiterie de type 2 et d'une provenderie, à Bukavu ZR-MINAGRI-210657-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des Travaux Individual de construction de 14 abris Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-01-29 dont 5 mini-minoteries, 2 Development 26 03 24 31 27 Selection rizerie de type 2, 1 entrepôt des intrants agricoles et 6 mini-laiteries de type 2, dans le territoire d’Uvira ZR-MINAGRI-210877-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Construction de 3 entrepôts Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- des produits agricoles avec IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 Development Implementation 10 03 07 04 bureaux des préposés et Selection latrines et d’1 entrepôt semencier à Katanga, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210874-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Construction de 3 entrepôts Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- des produits agricoles avec IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 Development Implementation 10 03 07 04 bureaux des préposés et Selection latrines à Baraka et d’1 entrepôt semencier à Nemba, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210876-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Construction de 3 entrepôts Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- des produits agricoles avec IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 Development Implementation 10 03 07 04 bureaux des préposés et Selection latrines à Sebele,Kabondonzi et Malinde et d’1 entrepôt semencier à Sebele,UPEP Sud- Kivu ZR-MINAGRI-210880-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Individual Construction de 4 entrepôts Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 des produits agricoles avec Development Implementation 10 03 07 04 Selection bureaux des préposés et latrines dont 2 à Fizi centre et 2 à Mulongwe, dans le cadre du PICAGL, UPEP Sud- Kivu Page 13 ZR-MINAGRI-210883-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Construction de 3 entrepôts Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- des produits agricoles avec IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 Development Implementation 10 03 07 04 bureaux des préposés et Selection latrines et de 2 entrepôts semenciers à Sange, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210873-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Individual Construction de 3 entrepôts Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 des produits agricoles avec Development Implementation 10 03 07 04 Selection bureaux des préposés et latrines à Kiliba et Runingu, et d’1 entrepôt semencier à Kiliba, UPEP Sud-Kivu ZR-MINAGRI-210879-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Individual Construction de 4 entrepôts Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 des produits agricoles avec Development Implementation 10 03 07 04 Selection bureaux des préposés et latrines dont 3 à Luvungi et 1 à Lubarika, dans le cadre du PICAGL, UPEP Sud-Kivu ZR-MINAGRI-210881-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Construction de 4 entrepôts Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- des produits agricoles avec IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 Development Implementation 10 03 07 04 bureaux des préposés et Selection latrines à Kagando, Kahwizi, Kigongo et Murunga, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210878-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Construction de 2 entrepôts Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- des produits agricoles avec IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 Development Implementation 10 03 07 04 bureaux des préposés et Selection latrines et d’1 entrepôt semencier à Nyangezi, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210882-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Individual Construction de 3 entrepôts Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 des produits agricoles avec Development Implementation 10 03 07 04 Selection bureaux des préposés et latrines à Kamanyola, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210875-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la surveillance des travaux de Construction de 2 entrepôts Individual Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- des produits agricoles avec IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-05 Development Implementation 10 03 07 04 bureaux des préposés et Selection latrines dont 1 à Mudaka et 1 à Bunyakiri/Bitale, dans le cadre du PICAGL, UPEP Sud- Kivu ZR-MINAGRI-210976-CS- INDV / Recrutement d’un (1) délégué à pied d’œuvre pour Individual le contrôle et la surveillance Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-04- 2021-09- IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-02-01 des Travaux de construction Development 26 06 27 03 30 Selection d’une (1) laiterie de type 3 à Cirunga, dans le territoire de Kabare ZR-MINAGRI-210978-CS- INDV / Recrutement d’un (1) délégué à pied d’œuvre pour le contrôle et la surveillance Individual Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-04- 2021-09- des Travaux de construction IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-02-01 Development 26 06 27 03 30 de trois (3) laiteries de type 3 Selection dont deux (2) à Luvungi et une (1) à Bwegera, dans le territoire d’Uvira ZR-MINAGRI-210977-CS- INDV / Recrutement d’un (1) délégué à pied d’œuvre pour le contrôle et la surveillance Individual Agriculture Value Chain 2021-05- 2021-02- 2021-02- 2021-04- 2021-09- des Travaux de construction IDA / 58520 Post Consultant Limited 8,000.00 0.00 Under Review 2021-02-01 Development 26 06 27 03 30 de quatre (4) laiteries de type Selection 3 dont 1 à Sange, 1 à Kavimvira et 2 à Uvira, dans le territoire d’Uvira ZR-MINAGRI-213742-CS- INDV / Recrutement d'un délégué à pied d'oeuvre pour la mission de contrôle et Individual surveillance des Travaux de Agriculture Value Chain Pending 2021-02- 2021-03- 2021-04- 2021-10- IDA / 58520 Post Consultant Limited 8,000.00 0.00 2021-02-08 construction de deux (2) mini Development Implementation 13 06 10 07 Selection chambres froides dont 1 à Luberezi et 1 Mutarule, dans le cadre du PICAGL, UPEP Sud- Kivu Page 14 PLAN DE PASSATION DES MARCHES AVEC INDICATION DES SEUILS DE REVUE ET DE PASSATION DES MARCHES Information sur le Projet : Togo –Projet de Filets Sociaux et de Services de Base (P157038) Agence d’exécution du Projet : Agence Nationale d’Appui au Développement à la Base (ANADEB) Date du plan de passation des marchés: 11 Septembre, 2017 Période couverte par ce plan de passation des marchés: Septembre, 2017 – 31 août, 2018 I. GENERAL 1. Informations sur le Projet : P-RAMS • Evaluation de risque par P-RAMS (Procurement Risk Assessment and Management System): Elevé II. TRAVAUX, FOURNITURES ET SERVICES AUTRES QUE LES SERVICES DE CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable : Seuils requis pour les décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans l’annexe 1 des "Directives de Passation des Marchés de fournitures, de travaux et de services (autres que les services de consultants) par les Emprunteurs de la Banque mondiale dans le cadre des prêts de la BIRD et des crédits de l’AID. Catégories de Seuils de revue a Observations marchés/Méthode de priori passation des marchés Montants estimatifs des contrats en millions de dollars américains Travaux, Contrats clé en main et Contrats de >= 5 Fourniture et Montage d’Installations Fournitures, Système d’information, et Services >= 1.5 autres que les services de consultants Travaux, Les justifications de Contrats Contrats clé en l’entente directe à passer main et devront être jointes par Contrats de >= 5 et approuvées avec entente Fourniture et PPM directe Montage d’Installations Fournitures, Système d’information, et Services >= 1.5 autres que les services de consultants 2. Pré qualification : Aucune n’a été pour l’instant identifiée. Toutefois, en cas de pré-qualification, les soumissionnaires seront pré qualifiées en accord avec les dispositions des paragraphes 2.9 et 2.10 des directives. 3. Seuils pour les méthodes de passation des marchés : Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES ET SERVICES AUTRE QUE LES SERVICES DE CONSULTANTS (US$ TRAVAUX (US$ équivalent) équivalent) AOI AON CF AOI AON CF < < 100.000 ≥5.000.000 <5.000.000 ≥ 500.000 < 500.000 200.000 4. Dispositions spéciales sur les marchés : Concernant les acquisitions de véhicules et de carburant, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur d’USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque ou distributeurs de produits pétroliers). II. Sélection des Consultants 1. Dispositions relatives aux seuils de revue préalable des marchés : Décisions de sélection sujet à la revue préalable de la Banquet comme indiqué dans l’annexe 1 du Guide de Sélection et d’Emploi des Consultants par les Emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID Méthode de Seuils de revue a Observations sélection/Catégories de priori marchés Montants estimatifs des contrats en millions de dollars américains Méthode >= 0.5 compétitive/Firmes de consultants Entente directe/firmes Les justifications pour >= 0.5 de consultants l’entente directe Entente devront être jointes et directe/Consultants >= 0.2 approuvées avec le individuel PPM Méthode Compétitive >= 0.2 (Comparaison de CVs)/ Consultants individuels 2. Liste restreinte composée entièrement de firmes nationales: La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du paragraphe 2.7 des Directives de Sélection et d’Emploi des Consultants, et l’Emprunteur ne procède pas à une publication dans UNDB. 3. Autre arrangement spécial de Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; cependant, ce seuil ne devrait pas dépasser la contre-valeur de USD 300,000 sauf dans des cas exceptionnels prévus au paragraphe 3.7 des directives pour la sélection et l’emploi des consultants par les emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID PROCUREMENT Togo : Safety Nets and Basic Services Project PLAN General Information Country: Togo Bank’s Approval Date of the Original Procurement Plan: 2017-09-11 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157038 GPN Date: 2017-07-31 Project Name: Safety Nets and Basic Services Project Loan / Credit No: IDA / V0650, IDA / D1740 N Executing Agency(ies): ational Agency for Development Support at the Base WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 03FT-PFS / Travaux Component 3:Capacity Request for Single Stage - One 2017-11- d'aménagement des Antennes IDA / V0650 building and project Post Limited 24,167.00 38,573.20 Signed 2017-07-20 2017-09-08 2017-09-14 2018-02-02 Quotations Envelope 13 Régionales ANADEB management GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3:Capacity 01FT-PFS / Acquisition de UN Agencies IDA / V0650 building and project Post Direct 300,000.00 223,857.36 Completed 2017-04-14 2017-06-01 2017-04-21 2017-06-01 2017-06-09 2017-09-25 2017-11-06 2018-01-15 matériel roulant (Direct) management 06FT-PFS / Reproduction des Component 2: Social safety Request for Single Stage - One carnets de reçus pour IDA / D1740 Post Limited 17,000.00 4,690.48 Completed 2017-08-22 2017-09-08 2017-10-17 2017-10-09 2017-11-16 2017-10-30 nets Quotations Envelope l'opération cantine scolaire Component 3:Capacity 02FT-PFS / Acquisition de Single Stage - One IDA / V0650 building and project Post Request for Bids Open - National 129,000.00 217,653.64 Signed 2017-04-14 2018-01-20 2017-04-21 2017-05-21 2017-07-19 2017-06-20 2017-09-20 2018-02-07 2017-12-27 2018-04-08 matériels informatiques Envelope management TG-ANADEB-44865-GO-RFB Component 3:Capacity Single Stage - One / Acquisition de six (6) IDA / V0650 building and project Post Request for Bids Open - National 70,000.00 75,869.41 Signed 2017-07-11 2017-07-18 2017-08-17 2017-09-04 2017-09-16 2017-10-20 2017-10-28 2018-07-20 2017-12-27 Envelope groupes électrogènes management TG-ANADEB-46559-GO-RFQ / Tablettes: Acquisition de 50 Component 3:Capacity tablettes pour les enquêtes Request for Single Stage - One IDA / D1740 building and project Post Limited 23,334.00 24,278.90 Completed 2018-02-06 2018-09-05 2018-04-03 2018-11-14 2018-06-02 2018-11-20 (PMT, géolocalisation, Quotations Envelope management enregistrement de données de terrain) TG-ANADEB-46571-GO-RFQ Component 3:Capacity / Fournitures de Bureau: Request for Single Stage - One IDA / D1740 building and project Post Limited 16,667.00 0.00 Canceled 2018-04-04 2018-05-30 2018-11-26 Acquisition de fournitures de Quotations Envelope management bureau TG-ANADEB-101617-GO- RFQ / Consommables cartes TM: Acquisition des Component 3:Capacity Request for Single Stage - One consommables pour la IDA / D1740 building and project Post Limited 17,000.00 29,589.54 Completed 2019-03-09 2019-03-11 2019-05-04 2019-05-02 2019-07-03 2019-05-27 Quotations Envelope production des cartes des management bénéficiaires des transferts monétaires TG-ANADEB-101632-GO- RFQ / Consommables de Component 3:Capacity Request for Single Stage - One bureau: Acquisition de IDA / D1740 building and project Post Limited 25,000.00 0.00 Canceled 2019-03-05 2019-04-30 2020-02-24 Quotations Envelope consommables informatiques management et bureautiques TG-ANADEB-46558-GO-RFQ / Communication institutionnelle: Production Component 3:Capacity de supports imprimés de Request for Single Stage - One IDA / D1740 building and project Post Limited 24,167.00 0.00 Canceled 2018-02-25 2018-04-22 2018-10-19 communication Quotations Envelope management institutionnelle autour du projet (dépliants, gadgets, étrennes, kakemono etc,) TG-ANADEB-46574-GO-RFQ Component 3:Capacity Request for Single Stage - One / Fourniture de IDA / D1740 building and project Post Limited 16,667.00 0.00 Canceled 2019-09-21 2019-11-16 2019-12-16 Quotations Envelope consommables informatiques management TG-ANADEB-123497-GO- DIR / Moteurs véhicules: Component 3:Capacity Acquisition, montage et IDA / D1740 building and project Post Direct Selection Direct 75,000.00 81,236.08 Signed 2019-09-11 2019-07-01 2019-09-26 2019-07-16 2019-10-27 2019-10-31 2020-01-25 services connexes de six (6) management moteurs pour les véhicules rétrocédés du projet PDCplus TG-ANADEB-164855-GO- RFQ / Tablette pour le Component 3:Capacity personnel: Acquisition de dix Request for Single Stage - One IDA / D1740 building and project Post Limited 15,000.00 28,486.57 Completed 2020-04-04 2020-11-20 2020-05-30 2020-12-31 2020-06-29 2021-02-15 (10) tablettes pour le Quotations Envelope management personnel de l'unité de gestion du projet TG-ANADEB-180540-GO- RFQ / ACQUISITION EPI: Acquisition des équipements Component 3:Capacity de protection individuels (EPI) Request for Single Stage - One IDA / D1740 building and project Post Limited 15,000.00 24,303.99 Completed 2020-07-01 2020-07-02 2020-08-26 2020-09-15 2020-09-15 2020-10-19 pour le personnel de Quotations Envelope management l'ANADEB dans le cadre de suivi et supervision de mise en œuvre des microprojets sur le terrain Page 1 TG-ANADEB-212323-GO- RFQ / Acquisition 3 Lap top: Acquisition de trois (03) Component 3:Capacity Pending ordinateurs performants pour Request for Single Stage - One IDA / D1740 building and project Post Limited 8,000.00 0.00 Implementati 2021-01-20 2021-03-17 2021-04-16 la gestion des bases de Quotations Envelope management on données du projet Filets sociaux et services de base (FSB) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 07FT-PFS / Location de Component 3:Capacity bureau dans les antennes IDA / V0650 building and project Post Direct Selection Direct 12,000.00 0.00 Canceled 2017-09-14 2017-09-19 2017-10-24 2018-10-24 régionales ANADEB management TG-ANADEB-46584-NC-RFQ Component 3:Capacity / Assurance du personnel: Request for Single Stage - One IDA / D1740 building and project Post Limited 16,667.00 12,806.53 Signed 2018-02-05 2018-07-09 2018-04-02 2018-06-19 2019-03-28 Souscription de police Quotations Envelope management d'assurance pour le personnel TG-ANADEB-48433-NC-RFQ / Extension réseau internet: Fourniture de services Component 3:Capacity Request for Single Stage - One d'extension du réseau intranet IDA / D1740 building and project Post Limited 20,000.00 0.00 Canceled 2018-02-22 2018-04-19 2018-06-18 Quotations Envelope et internet (câblage et management connections internet ADSL) dans les bureaux de l'ANADEB TG-ANADEB-48480-NC-RFQ / Supports audio-visuels: Component 3:Capacity Production des manuels et Request for Single Stage - One IDA / D1740 building and project Post Limited 33,334.00 0.00 Canceled 2018-03-08 2018-05-03 2018-07-02 des guides illustrés du projet Quotations Envelope management sous forme de supports audio- visuels TG-ANADEB-48435-NC-RFB / Impression et multiplication Component 3:Capacity des manuels, des brochures, Single Stage - One IDA / D1740 building and project Post Request for Bids Open - National 75,000.00 0.00 Canceled 2018-03-01 2018-03-08 2018-04-19 2018-05-19 2018-06-23 2018-08-22 des guides illustrés et des Envelope management supports pédagogiques sur les activités du projet TG-ANADEB-48434-NC-RFQ Component 3:Capacity / Magasine: Production d'un Request for Single Stage - One IDA / D1740 building and project Post Limited 16,667.00 0.00 Canceled 2018-03-11 2018-05-06 2018-07-05 magasine d'information Quotations Envelope management semestriel TG-ANADEB-49332-NC-RFQ / Paiement des TM: Fourniture des services de transfert Component 2: Social safety Request for Single Stage - One IDA / D1740 Post Limited 100,000.00 79,045.10 Signed 2018-03-06 2018-10-12 2018-05-08 2018-12-24 2019-05-03 monétaires aux bénéficiaires nets Quotations Envelope de la sous composante des Transferts monétaires 05FT-PFS / Acquisition de modules complémentaires de Component 3:Capacity TOM2PRO et de IDA / V0650 building and project Post Direct Selection Direct 70,000.00 0.00 Canceled 2017-04-21 2017-04-28 2017-06-16 2017-08-15 TOMMONITORING et des clé management de connexion et fourniture de services connexes TG-ANADEB-69430-NC-DIR / LOGICIEL TOM2PRO: Acquisition de modules Component 3:Capacity complémentaires de IDA / D1740 building and project Post Direct Selection Direct 105,000.00 108,947.26 Signed 2018-07-12 2018-07-27 2018-07-17 2018-08-03 2018-08-21 2018-10-12 2018-09-20 TOM2PRO et de management TOMMONITORING et des clé de connexion et fourniture de services connexes TG-ANADEB-99919-NC-RFQ / Reproduction guides FGB: Component 3:Capacity Reproduction des guides Request for Single Stage - One IDA / D1740 building and project Post Limited 55,000.00 39,058.24 Signed 2019-03-20 2019-05-29 2019-05-22 2019-09-11 2019-11-18 illustrés de formation de Quotations Envelope management gestion à la base (FGB) du projet TG-ANADEB-101629-NC- RFQ / Carnet TM: Component 3:Capacity Request for Single Stage - One Reproduction des cartes de IDA / D1740 building and project Post Limited 30,000.00 10,191.40 Signed 2019-03-05 2019-03-14 2019-04-30 2019-05-21 2019-05-30 Quotations Envelope bénéficiaires des transferts management monétaires TG-ANADEB-101958-NC- RFQ / Extension câblage internet: Fourniture de services d'extension du Component 3:Capacity Request for Single Stage - One réseau intranet et internet IDA / D1740 building and project Post Limited 20,000.00 0.00 Canceled 2019-03-06 2019-05-01 2019-05-31 Quotations Envelope (câblage et connections management internet ADSL) dans les bureaux des Antennes régionales de l'ANADEB TG-ANADEB-197272-NC- RFQ / PLANCHES PHOTO CAUSERIES TM: Reproduction Component 3:Capacity Pending Request for Single Stage - One de planches-photo pour les IDA / D1740 building and project Post Limited 50,000.00 0.00 Implementati 2020-11-04 2021-01-06 2021-02-05 Quotations Envelope causeries socio-éducatives management on sur les transferts monétaire (TM) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 01PI-PFS / Sélection d'un Component 3:Capacity Consultant cabinet pour le recrutement IDA / V0650 building and project Post Qualification Open - National 40,000.00 16,801.42 Signed 2017-04-10 2017-05-02 2017-05-01 2017-06-14 2017-07-04 2017-07-14 2017-07-28 2017-08-18 2017-08-17 2017-10-17 du personnel du projet management Selection 06PI-PFS / Recrutement des Consultant ONG pour la mise en œuvre Component 2: Social safety IDA / D1740 Post Qualification Open - National 195,000.00 130,248.82 Signed 2017-07-05 2017-10-20 2017-07-26 2017-09-08 2017-11-14 2017-10-08 2017-12-15 2017-11-12 2017-12-26 2018-08-09 des cantines scolaires dans nets Selection les écoles bénéficiaires 02PI-PFS / Recrutement d'un Component 3:Capacity cabinet pour l'audit des Least Cost IDA / V0650 building and project Post Open - National 15,000.00 0.00 Canceled 2017-07-15 2017-08-05 2017-09-18 2017-10-16 2017-11-15 2017-12-20 2018-01-24 2018-02-23 comptes du fonds de Selection management préparation du projet TG-ANADEB-46579-CS-LCS / Audit Financier Comptable: Sélection d'un cabinet pour Component 3:Capacity Least Cost l'audit financier et comptable IDA / D1740 building and project Post Open - National 40,000.00 57,412.34 Signed 2018-05-31 2018-09-26 2018-06-21 2018-08-04 2018-12-12 2018-09-01 2018-12-31 2018-10-01 2019-01-16 2018-11-05 2019-02-05 2018-12-10 2019-04-02 2019-10-06 Selection du Projet, Exercices 2018 management (Juillet 2017 à Décembre 2018), 2019 et 2020 TG-ANADEB-101956-CS- CQS / Évaluation processus Component 3:Capacity Consultant TM: Recrutement d'un IDA / D1740 building and project Post Qualification Open - National 50,000.00 60,845.87 Completed 2019-04-15 2020-02-26 2019-04-29 2019-06-28 2020-06-19 2019-07-19 2020-08-07 2019-08-23 2020-08-26 2019-10-22 2021-02-12 consultant pour l'évaluation management Selection du processus du programme des transferts monétaires TG-ANADEB-46577-CS-CQS / Conception SIG: Sélection Consultant d'un consultant pour la Component 2: Social safety IDA / V0650 Post Qualification Open - National 58,334.00 0.00 Canceled 2018-01-31 2018-02-21 2018-04-06 2018-05-06 2018-06-10 2018-09-08 conception et l'installation du nets Selection système d'information et de gestion (SIG) des projets TG-ANADEB-143908-CS- CQS / Agence de communication: sélection Component 3:Capacity Consultant d'une agence de IDA / D1740 building and project Post Qualification Limited 25,000.00 0.00 Canceled 2019-11-20 2019-12-04 2020-01-03 2020-02-07 2020-12-03 communication pour la management Selection capitalisation des réalisations du projet FSB TG-ANADEB-101955-CS- CQS / Mise en place du RSU: Component 3:Capacity Consultant Sélection d'une firme pour la IDA / D1740 building and project Post Qualification Open - National 92,000.00 0.00 Canceled 2020-04-30 2020-05-14 2020-07-13 2020-08-03 2020-09-07 2020-12-06 mise en place du système du management Selection registre social unifié (RSU) TG-ANADEB-197245-CS- CQS / Formation en sauvegarde du personnel: Recrutement d'un cabinet Component 3:Capacity Consultant pour la formation du IDA / D1740 building and project Post Qualification Open - National 50,000.00 0.00 Canceled 2020-10-30 2020-12-07 2020-11-13 2020-12-27 2021-01-11 2021-02-15 2021-03-17 personnel de l'ANADEB sur les management Selection directives en sauvegardes environnementales et sociales des bailleurs notamment la Banque mondiale TG-ANADEB-204771-CS- CQS / Étude Financement Component 3:Capacity Consultant Cantines: Sélection d'un IDA / D1740 building and project Post Qualification Open - National 42,000.00 0.00 Canceled 2020-12-31 2021-01-21 2021-03-06 2021-04-05 2021-05-10 2021-07-09 cabinet pour l'étude sur les management Selection financements innovants des cantines scolaires TG-ANADEB-228821-CS- CQS / AUDIT TM DIGITAUX: SÉLECTION D'UN BUREAU/CABINET POUR Component 3:Capacity Consultant Pending L'AUDIT DES PAIEMENTS IDA / D1740 building and project Post Qualification Open - National 65,000.00 0.00 2021-04-20 2021-05-04 2021-06-08 2021-06-29 2021-08-03 2021-09-02 Implementation DIGITAUX DES TRANSFERTS management Selection MONÉTAIRES (TM) DU PROJET DE FILETS SOCIAUX ET SERVICES DE BASE (FSB) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 05PI-PFS / Recrutement d'un consultant national en appui Component 3:Capacity Individual au système de planification et IDA / V0650 building and project Post Consultant Open 17,000.00 0.00 Canceled 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14 du suivi évaluation de management Selection l'ANADEB TG-ANADEB-36702-CS-INDV / Coordonnateur: Component 3:Capacity Individual Recrutement d'Un IDA / D1740 building and project Post Consultant Open 30,000.00 33,512.32 Signed 2017-06-01 2017-06-09 2017-07-20 2017-11-23 2017-08-10 2017-11-24 2017-09-14 2018-03-01 2018-09-09 Coordonnateur pour le management Selection compte de l'Unité de gestion du projet TG-ANADEB-46332-CS-INDV / Consultant FGB : Component 3:Capacity Individual Recrutement d'un (01) IDA / D1740 building and project Post Consultant Open 33,350.00 33,387.89 Signed 2018-01-28 2018-03-18 2018-04-05 2018-04-08 2018-06-11 2018-05-13 2018-08-10 2018-11-09 Consultant pour l'actualisation management Selection des outils de formation en gestion à la base (FGB) TG-ANADEB-46353-CS-INDV Component 3:Capacity Individual / Assistant SSE: Recrutement IDA / D1740 building and project Post Consultant Open 15,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-20 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 d'un (01) Assistant suivi- management Selection évaluation Page 3 TG-ANADEB-46355-CS-INDV / Gestionnaire SIG: Component 3:Capacity Individual Recrutement d'un (01) IDA / D1740 building and project Post Consultant Open 20,000.00 15,461.44 Signed 2018-01-31 2018-05-17 2018-03-21 2019-01-09 2018-04-11 2019-01-11 2018-05-16 2019-01-14 2019-05-11 Spécialiste en système management Selection d'information et de gestion (SIG) TG-ANADEB-46359-CS-INDV / Assistant administratif: Component 3:Capacity Individual Recrutement d'un (01) IDA / D1740 building and project Post Consultant Open 10,000.00 6,260.62 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-21 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 Assistant administratif pour le management Selection projet TG-ANADEB-46799-CS-INDV / Sauvegarde sociale: Component 3:Capacity Individual Recrutement d'un Spécialiste IDA / D1740 building and project Post Consultant Open 20,000.00 26,587.73 Signed 2017-10-15 2017-10-20 2017-12-03 2017-12-26 2017-12-24 2018-04-09 2018-01-28 2018-04-10 2019-01-23 en sauvegarde sociale pour le management Selection compte du projet TG-ANADEB-44863-CS-INDV / SGF: Recrutement d'Un Component 3:Capacity Individual Spécialiste en gestion IDA / D1740 building and project Post Consultant Open 10,000.00 22,551.84 Signed 2017-06-01 2017-06-09 2017-07-20 2017-11-24 2017-08-10 2017-12-06 2017-09-14 2018-03-01 2018-03-13 financière (SGF) pour le management Selection compte de l'Unité de gestion du projet TG-ANADEB-44864-CS-INDV / SPM: Recrutement d'un Component 3:Capacity Individual Spécialiste en passation de IDA / D1740 building and project Post Consultant Open 10,000.00 25,026.30 Signed 2017-06-01 2017-06-09 2017-07-20 2017-12-11 2017-08-10 2017-12-13 2017-09-14 2018-03-01 2018-03-13 marchés (SPM) pour le compte management Selection de l'Unité de gestion du projet TG-ANADEB-46352-CS-INDV / Filets Sociaux RM: Recrutement d'un(e) Assistant Component 3:Capacity Individual régional en transfert IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-20 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 monétaire/ cantines scolaires management Selection pour le compte du projet au profit de l'antenne régionale Maritime de l'ANADEB TG-ANADEB-46357-CS-INDV / FGB Région Maritime: Recrutement d'un(e) Component 3:Capacity Individual Formateur en gestion à la IDA / D1740 building and project Post Consultant Open 14,000.00 15,654.14 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-28 2018-04-11 2018-10-04 2018-05-16 2018-11-12 2019-05-11 base (FGB) pour le compte du management Selection projet au profit de l'antenne régionale Maritime de l'ANADEB TG-ANADEB-46365-CS-INDV / Graphiste: Recrutement d'un illustrateur (Graphiste) pour Component 3:Capacity Individual l'actualisation/adaptation des IDA / D1740 building and project Post Consultant Open 15,000.00 0.00 Canceled 2018-02-05 2018-03-26 2018-04-16 2018-05-21 2018-09-18 boîtes à images des modules management Selection de formation en gestion à la base (FGB) TG-ANADEB-48453-CS-INDV / FGB Région Plateaux: Recrutement d'un(e) Component 3:Capacity Individual Formateur en gestion à la IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-28 2018-04-11 2018-10-01 2018-05-16 2018-10-04 2019-05-11 base (FGB) pour le compte du management Selection projet au profit de l'antenne régionale Plateaux de l'ANADEB TG-ANADEB-48454-CS-INDV / FGB Région Centrale: Recrutement d'un(e) Component 3:Capacity Individual Formateur en gestion à la IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-28 2018-04-11 2018-10-04 2018-05-16 2018-10-08 2019-05-11 base (FGB) pour le compte du management Selection projet au profit de l'antenne régionale Centrale de l'ANADEB TG-ANADEB-48455-CS-INDV / FGB Région Kara: Recrutement d'un(e) Component 3:Capacity Individual Formateur en gestion à la IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-28 2018-04-11 2018-10-01 2018-05-16 2018-10-03 2019-05-11 base (FGB) pour le compte du management Selection projet au profit de l'antenne régionale Kara de l'ANADEB TG-ANADEB-48457-CS-INDV / FGB Région Savanes: Recrutement d'un(e) Component 3:Capacity Individual Formateur en gestion à la IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-28 2018-04-11 2018-10-04 2018-05-16 2018-10-04 2019-05-11 base (FGB) pour le compte du management Selection projet au profit de l'antenne régionale Savanes de l'ANADEB TG-ANADEB-48459-CS-INDV / Filets Sociaux RP: Recrutement d'un(e) Assistant Component 3:Capacity Individual régional en transfert IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-04-04 2018-09-26 2018-04-25 2018-09-28 2018-05-30 2018-10-01 2019-05-25 monétaire/ cantines scolaires management Selection pour le compte du projet au profit de l'antenne régionale Plateaux de l'ANADEB TG-ANADEB-48460-CS-INDV / Filets Sociaux RC: Recrutement d'un(e) Assistant Component 3:Capacity Individual régional en transfert IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-13 2018-04-11 2018-10-26 2018-05-16 2018-10-01 2019-05-11 monétaire/ cantines scolaires management Selection pour le compte du projet au profit de l'antenne régionale Centrale de l'ANADEB TG-ANADEB-48463-CS-INDV / Filets Sociaux RK: Recrutement d'un(e) Assistant Component 3:Capacity Individual régional en transfert IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-20 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 monétaire/ cantines scolaires management Selection pour le compte du projet au profit de l'antenne régionale Kara de l'ANADEB Page 4 TG-ANADEB-48464-CS-INDV / Filets Sociaux RS: Recrutement d'un(e) Assistant Component 3:Capacity Individual régional en transfert IDA / D1740 building and project Post Consultant Open 14,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-20 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 monétaire/ cantines scolaires management Selection pour le compte du projet au profit de l'antenne régionale Savanes de l'ANADEB TG-ANADEB-46341-CS-CDS / Ciblage de bénéficiaires: Component 2: Social safety Sélection d'une firme pour le IDA / V0650 Post Direct Selection Direct 116,667.00 97,705.78 Signed 2018-01-28 2018-03-29 2018-02-09 2018-05-11 2018-04-15 2018-07-20 2018-08-13 nets ciblage des bénéficiaires du projet TG-ANADEB-48466-CS-INDV / Assistant Infra RP: Recrutement d'un Assistant régional en Infrastructures, Component 3:Capacity Individual Chargé de la passation des IDA / D1740 building and project Post Consultant Open 16,000.00 15,390.55 Signed 2018-01-31 2018-01-31 2018-03-21 2018-10-09 2018-04-11 2018-12-31 2018-05-16 2019-01-07 2019-05-11 marchés pour le compte du management Selection projet au profit de l'antenne régionale Plateaux de l'ANADEB TG-ANADEB-46802-CS-INDV / Comptable-gestionnaire: Component 3:Capacity Individual Recrutement d'un Comptable- IDA / D1740 building and project Post Consultant Direct 10,000.00 0.00 Canceled 2017-12-01 2017-12-11 2017-12-18 2018-01-01 2018-06-30 gestionnaire au niveau management Selection national pour le compte du projet TG-ANADEB-46351-CS-INDV / Assistant Infra RM: Recrutement d'un Assistant régional en Infrastructures, Component 3:Capacity Individual Chargé de la passation des IDA / D1740 building and project Post Consultant Open 16,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-21 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 marchés pour le compte du management Selection projet au profit de l'antenne régionale Maritime de l'ANADEB TG-ANADEB-46358-CS-INDV / Comptable-Gestionnaire RM: Recrutement d'un Component 3:Capacity Individual comptable-gestionnaire IDA / D1740 building and project Post Consultant Open 14,000.00 14,688.17 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-13 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 régional pour le compte du management Selection projet au profit de l'antenne régionale Maritime de l'ANADEB TG-ANADEB-46363-CS-INDV / Secrétaire-Caissier RM: Recrutement d'un(e) secrétaire Component 3:Capacity Individual caissier pour le compte du IDA / D1740 building and project Post Consultant Open 6,000.00 5,217.18 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-21 2018-04-11 2018-09-26 2018-05-16 2018-10-08 2019-05-11 projet au profit de l'antenne management Selection régionale Maritime de l'ANADEB TG-ANADEB-48450-CS-INDV / Secrétaire-Caissier RP: Recrutement d'un(e) secrétaire Component 3:Capacity Individual Under caissier pour le compte du IDA / D1740 building and project Post Consultant Open 6,000.00 0.00 2018-01-31 2018-01-31 2018-03-21 2018-04-11 2018-05-16 2019-05-11 Implementation projet au profit de l'antenne management Selection régionale Plateaux de l'ANADEB TG-ANADEB-48451-CS-INDV / Secrétaire-Caissier RC: Recrutement d'un(e) secrétaire Component 3:Capacity Individual caissier pour le compte du IDA / D1740 building and project Post Consultant Open 6,000.00 5,217.18 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-21 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 projet au profit de l'antenne management Selection régionale Centrale de l'ANADEB TG-ANADEB-48468-CS-INDV / Assistant Infra RC: Recrutement d'un Assistant régional en Infrastructures, Component 3:Capacity Individual Chargé de la passation des IDA / D1740 building and project Post Consultant Open 16,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-21 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 marchés pour le compte du management Selection projet au profit de l'antenne régionale Centrale de l'ANADEB TG-ANADEB-48469-CS-INDV / Assistant Infra RK: Recrutement d'un Assistant Component 3:Capacity Individual régional en Infrastructures, IDA / D1740 building and project Post Consultant Open 16,000.00 15,703.71 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-21 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 Chargé de la passation des management Selection marchés pour le compte du projet au profit de l'antenne régionale Kara de l'ANADEB TG-ANADEB-48470-CS-INDV / Assistant Infra RS: Recrutement d'un Assistant régional en Infrastructures, Component 3:Capacity Individual Chargé de la passation des IDA / D1740 building and project Post Consultant Open 16,000.00 15,187.47 Signed 2018-01-31 2018-01-31 2018-03-21 2018-10-30 2018-04-11 2019-10-30 2018-05-16 2018-11-12 2019-05-11 marchés pour le compte du management Selection projet au profit de l'antenne régionale Savanes de l'ANADEB TG-ANADEB-48473-CS-INDV / Comptable-Gestionnaire RP: Recrutement d'un comptable- Component 3:Capacity Individual gestionnaire régional pour le IDA / D1740 building and project Post Consultant Open 14,000.00 14,688.17 Signed 2018-01-31 2018-01-31 2018-03-21 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 compte du projet au profit de management Selection l'antenne régionale Plateaux de l'ANADEB Page 5 TG-ANADEB-48474-CS-INDV / Comptable-Gestionnaire RC: Recrutement d'un comptable- Component 3:Capacity Individual gestionnaire régional pour le IDA / D1740 building and project Post Consultant Open 14,000.00 14,688.17 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-13 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 compte du projet au profit de management Selection l'antenne régionale Centrale de l'ANADEB TG-ANADEB-48477-CS-INDV / Comptable-Gestionnaire RS: Recrutement d'un comptable- Component 3:Capacity Individual gestionnaire régional pour le IDA / D1740 building and project Post Consultant Open 14,000.00 14,688.17 Signed 2018-01-31 2018-06-22 2018-03-21 2018-09-13 2018-04-11 2018-09-26 2018-05-16 2018-10-15 2019-05-11 compte du projet au profit de management Selection l'antenne régionale Savanes de l'ANADEB TG-ANADEB-48476-CS-INDV / Comptable-Gestionnaire RK: Recrutement d'un comptable- Component 3:Capacity Individual gestionnaire régional pour le IDA / D1740 building and project Post Consultant Open 14,000.00 14,688.17 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-13 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 compte du projet au profit de management Selection l'antenne régionale Kara de l'ANADEB TG-ANADEB-46364-CS-INDV / Chauffeur-Coursier FSB: Recrutement d'un (01) Component 3:Capacity Individual Chauffeur-Coursier pour le IDA / D1740 building and project Post Consultant Open 4,000.00 3,131.68 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-24 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 compte du projet au profit de management Selection la direction générale de l'ANADEB TG-ANADEB-51929-CS-INDV / Chauffeur-Coursier RM: Recrutement d'un (01) Component 3:Capacity Individual Chauffeur-Coursier pour le IDA / D1740 building and project Post Consultant Open 4,000.00 2,712.93 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-14 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 compte du projet au profit de management Selection l'Antenne régionale de l'ANADEB Maritime TG-ANADEB-51930-CS-INDV / Chauffeur-Coursier RP: Recrutement d'un (01) Component 3:Capacity Individual Under Chauffeur-Coursier pour le IDA / D1740 building and project Post Consultant Open 4,000.00 0.00 2018-01-31 2018-01-31 2018-03-21 2018-09-26 2018-04-11 2018-05-16 2019-05-11 Implementation compte du projet au profit de management Selection l'Antenne régionale de l'ANADEB Plateaux TG-ANADEB-51931-CS-INDV / Chauffeur-Coursier RC: Recrutement d'un (01) Component 3:Capacity Individual Chauffeur-Coursier pour le IDA / D1740 building and project Post Consultant Open 4,000.00 2,714.12 Signed 2018-01-31 2018-01-31 2018-03-21 2018-09-14 2018-04-11 2018-09-26 2018-05-16 2018-10-01 2019-05-11 compte du projet au profit de management Selection l'Antenne régionale de l'ANADEB Centrale TG-ANADEB-62826-CS-INDV / Formation en Passation des Component 3:Capacity Individual Marchés: Recrutement d'un IDA / D1740 building and project Post Consultant Limited 25,000.00 0.00 Canceled 2018-05-31 2018-06-05 2018-06-26 2018-07-31 2018-09-29 consultant pour la formation management Selection des acteurs sur la passation des marchés communautaires TG-ANADEB-46347-CS-INDV / FGB proximité RM: Recrutement de cinq (5) Component 3:Capacity Individual prestataires individuels IDA / D1740 building and project Post Consultant Open 5,835.00 0.00 Canceled 2018-07-31 2018-07-08 2018-09-18 2018-10-09 2018-11-13 2019-09-09 chargés de l'animation management Selection communautaire en Formation en Gestion à la Base (FGB) dans la région Maritime TG-ANADEB-74839-CS-INDV / FGB proximité RP: Recrutement de huit (8) Component 3:Capacity Individual prestataires individuels IDA / D1740 building and project Post Consultant Open 9,336.00 0.00 Canceled 2018-07-31 2018-09-18 2018-10-09 2018-11-13 2019-09-09 chargés de l'animation management Selection communautaire en Formation en Gestion à la Base (FGB) dans la région des Plateaux TG-ANADEB-74842-CS-INDV / FGB proximité RC: Recrutement de sept (7) Component 3:Capacity Individual prestataires individuels IDA / D1740 building and project Post Consultant Open 8,170.00 0.00 Canceled 2018-07-31 2018-09-18 2018-10-09 2018-11-13 2019-09-09 chargés de l'animation management Selection communautaire en Formation en Gestion à la Base (FGB) dans la région Centrale TG-ANADEB-74845-CS-INDV / FGB proximité RK: Recrutement de neuf (9) Component 3:Capacity Individual prestataires individuels IDA / D1740 building and project Post Consultant Open 10,500.00 0.00 Canceled 2018-07-31 2018-09-18 2018-10-09 2018-11-13 2019-09-09 chargés de l'animation management Selection communautaire en Formation en Gestion à la Base (FGB) dans la région de la Kara TG-ANADEB-74847-CS-INDV / FGB proximité RS: Recrutement de onze (11) Component 3:Capacity Individual prestataires individuels IDA / D1740 building and project Post Consultant Open 12,840.00 0.00 Canceled 2018-07-31 2018-01-31 2018-09-18 2018-10-09 2018-11-13 2019-09-09 chargés de l'animation management Selection communautaire en Formation en Gestion à la Base (FGB) dans la région des savanes TG-ANADEB-101639-CS- INDV / Géoréférencement: Recrutement d'un consultant Component 3:Capacity Individual pour l'appui à l'ANADEB dans IDA / D1740 building and project Post Consultant Open 25,000.00 0.00 Canceled 2019-04-30 2019-07-13 2019-08-03 2019-09-07 2019-11-06 le géoréférencement des management Selection microprojets sociocommunautaires Page 6 TG-ANADEB-101950-CS- INDV / Formation en Passation des Marchés: Component 3:Capacity Individual Recrutement d'un consultant IDA / D1740 building and project Post Consultant Open 17,000.00 20,277.86 Signed 2019-02-25 2019-03-28 2019-03-31 2019-05-20 2019-04-21 2019-07-08 2019-05-26 2019-07-15 2019-07-25 pour la formation des acteurs management Selection sur la passation des marchés communautaires TG-ANADEB-101952-CS- INDV / Evaluation sociale: Component 3:Capacity Individual Recrutement d'un (01) IDA / D1740 building and project Post Consultant Open 25,000.00 0.00 Under Review 2019-05-02 2019-07-15 2019-08-05 2019-09-09 2019-11-08 Consultant pour l'évaluation management Selection en genre et développement social sur les microprojets TG-ANADEB-101954-CS- INDV / Évaluation mi- Component 3:Capacity Individual parcours: Recrutement d'un IDA / D1740 building and project Post Consultant Open 25,000.00 24,428.28 Completed 2019-02-28 2019-02-08 2019-05-13 2019-04-11 2019-06-03 2019-04-26 2019-07-08 2019-05-07 2019-09-06 2019-06-07 (01) Consultant pour management Selection l'évaluation à mi-parcours du projet TG-ANADEB-107032-CS- INDV / Consultant screening Component 3:Capacity Individual social: Recrutement d'un Under IDA / D1740 building and project Post Consultant Limited 4,500.00 5,495.83 2019-02-15 2019-02-02 2019-03-02 2019-03-02 2019-03-09 2019-03-22 2019-03-21 2019-07-19 consultant en sauvegarde Implementation management Selection sociale pour appui au screening des microprojets TG-ANADEB-107033-CS- INDV / Consultant screening Component 3:Capacity Individual social: Recrutement d'un IDA / D1740 building and project Post Consultant Limited 4,500.00 5,406.68 Signed 2019-02-15 2019-02-02 2019-03-02 2019-03-02 2019-03-09 2019-03-22 2019-03-21 2019-03-25 2019-07-19 consultant en sauvegarde management Selection sociale pour appui au screening des microprojets TG-ANADEB-107034-CS- INDV / Consultant screening Component 3:Capacity Individual environnemental: IDA / D1740 building and project Post Consultant Limited 4,500.00 5,406.68 Signed 2019-02-15 2019-02-02 2019-03-02 2019-03-02 2019-03-09 2019-03-22 2019-03-21 2019-03-25 2019-07-19 Recrutement d'un consultant management Selection en sauvegarde environnemantale pour appui au screening des microprojets TG-ANADEB-107035-CS- INDV / Spécialiste Sauvegarde Component 3:Capacity Individual Sociale: Recrutement d'un IDA / D1740 building and project Post Consultant Open 20,000.00 25,851.36 Signed 2019-03-28 2019-03-27 2019-05-01 2019-09-17 2019-05-15 2019-09-18 2019-06-12 2019-10-03 2020-06-06 Spécialiste en sauvegarde management Selection sociale pour le compte de l'unité de gestion du projet TG-ANADEB-127084-CS- INDV / Filets Sociaux RS: Recrutement d'un(e) Assistant Component 3:Capacity Individual régional en transfert IDA / D1740 building and project Post Consultant Open 14,000.00 1,392.45 Signed 2019-08-20 2019-09-25 2019-09-15 2020-02-11 2019-09-22 2020-02-14 2019-10-02 2020-03-02 2020-09-26 monétaire/ cantines scolaires management Selection pour le compte du projet au profit de l'antenne régionale Maritime de l'ANADEB TG-ANADEB-132921-CS- INDV / Comptable RM: Recrutement d'un Comptable Component 3:Capacity Individual gestionnaire pour le compte IDA / D1740 building and project Post Consultant Open 16,000.00 15,469.15 Signed 2019-09-16 2019-10-01 2019-10-20 2020-02-10 2019-10-27 2020-02-14 2019-11-10 2020-03-02 2020-11-04 du projet au profit de management Selection l'antenne régionale Maritime de l'ANADEB TG-ANADEB-132923-CS- INDV / Audit institutionnel Component 3:Capacity Individual ANADEB: Recrutement d'un IDA / D1740 building and project Post Consultant Open 25,000.00 0.00 Canceled 2019-09-30 2019-11-03 2019-11-24 2019-12-29 2020-02-27 consultant individuel pour management Selection l’audit organisationnel et institutionnel de l’ANADEB TG-ANADEB-123267-CS- CDS / Mission de recours INSEED: Contractualisation avec l'INSEED pour la gestion Component 3:Capacity des recours liés aux listes des IDA / D1740 building and project Post Direct Selection Direct 171,500.00 0.00 Canceled 2019-07-17 2019-07-27 2019-09-30 2020-03-28 ménages bénéficiaires des management transferts monétaires et la sélection de nouveaux ménages bénéficiaires TG-ANADEB-143903-CS- INDV / Consultant social RM: Recrutement d'un consultant social junior pour le suivi de mise en œuvre des mesures Component 3:Capacity Individual de sauvegardes IDA / D1740 building and project Post Consultant Open 10,000.00 6,134.83 Signed 2019-11-15 2020-01-08 2019-12-25 2020-07-21 2020-01-15 2020-07-24 2020-02-19 2020-08-14 2021-02-13 environnementale et sociale management Selection dans le cadre des sous- projets communautaires des projets FSB et EJV dans la région maritime TG-ANADEB-143904-CS- INDV / Consultant social RP: Recrutement d'un consultant social junior pour le suivi de mise en œuvre des mesures Component 3:Capacity Individual de sauvegardes IDA / D1740 building and project Post Consultant Open 10,000.00 6,166.28 Signed 2019-11-15 2020-01-08 2019-12-25 2020-07-21 2020-01-15 2020-07-24 2020-02-19 2020-08-14 2021-02-13 environnementale et sociale management Selection dans le cadre des sous- projets communautaires des projets FSB et EJV dans la région des Plateaux TG-ANADEB-143905-CS- INDV / Consultant social RC: Recrutement d'un consultant social junior pour le suivi de mise en œuvre des mesures Component 3:Capacity Individual de sauvegardes IDA / D1740 building and project Post Consultant Open 10,000.00 6,163.01 Signed 2019-11-15 2020-01-08 2019-12-25 2020-07-21 2020-01-15 2020-07-24 2020-02-19 2020-08-14 2021-02-13 environnementale et sociale management Selection dans le cadre des sous- projets communautaires des projets FSB et EJV dans la région Centrale Page 7 TG-ANADEB-143906-CS- INDV / Consultant social RK: Recrutement d'un consultant social junior pour le suivi de mise en œuvre des mesures Component 3:Capacity Individual de sauvegardes IDA / D1740 building and project Post Consultant Open 10,000.00 6,163.01 Signed 2019-11-15 2020-01-08 2019-12-25 2020-07-21 2020-01-15 2020-07-24 2020-02-19 2020-08-14 2021-02-13 environnementale et sociale management Selection dans le cadre des sous- projets communautaires des projets FSB et EJV dans la région Kara TG-ANADEB-143907-CS- INDV / Consultant social RS: Recrutement d'un consultant social junior pour le suivi de mise en œuvre des mesures Component 3:Capacity Individual de sauvegardes IDA / D1740 building and project Post Consultant Open 10,000.00 6,163.01 Signed 2019-11-15 2020-01-08 2019-12-25 2020-07-21 2020-01-15 2020-08-07 2020-02-19 2020-08-14 2021-02-13 environnementale et sociale management Selection dans le cadre des sous- projets communautaires des projets FSB et EJV dans la région des Savanes TG-ANADEB-150059-CS- INDV / Audit institutionnel ANADEB: Recrutement d'un consultant individuel pour l'audit institutionnel t Component 3:Capacity Individual organisationnel de l'Agence IDA / D1740 building and project Post Consultant Limited 40,000.00 74,345.00 Signed 2020-01-03 2019-12-17 2020-01-18 2020-01-09 2020-02-08 2020-06-09 2020-03-07 2020-08-26 2020-05-06 nationale d'appui au management Selection développement à la base (ANADEB) en charge de la mise en œuvre des projets FSB et EJV TG-ANADEB-101636-CS- INDV / Audit marchés Component 3:Capacity Individual communautaires: IDA / D1740 building and project Post Consultant Open 35,000.00 22,778.29 Signed 2020-04-30 2020-06-23 2020-07-13 2020-11-24 2020-08-03 2021-01-25 2020-09-07 2021-03-11 2020-11-06 Recrutement d'un consultant management Selection pour l'audit des marchés communautaires TG-ANADEB-165419-CS- Component 3:Capacity Individual INDV / Gestionnaire RSU: IDA / D1740 building and project Post Consultant Open 20,000.00 0.00 Canceled 2020-04-30 2020-04-30 2020-06-18 2020-07-02 2020-08-06 2021-08-01 Recrutement d'un management Selection gestionnaire du Registre Social Unifié (RSU) TG-ANADEB-194529-CS- INDV / Collaboration élus locaux ANADEB: Recrutement Component 3:Capacity Individual d'un (01) Consultant pour IDA / D1740 building and project Post Consultant Limited 10,000.00 26,594.34 Signed 2020-09-25 2020-09-30 2020-09-30 2020-10-02 2020-10-15 2020-12-01 2020-11-19 2020-12-18 2020-12-19 l'élaboration de la stratégie de management Selection collaboration entre l'ANADEB et les élus locaux TG-ANADEB-165416-CS- INDV / Audit environnemental et social : Recrutement d'un consultant pour l'Audit Component 3:Capacity Individual Under environnemental et social des IDA / D1740 building and project Post Consultant Open 35,000.00 0.00 2020-11-30 2020-11-24 2021-01-18 2021-02-08 2021-03-15 2021-05-14 Implementation infrastructures management Selection sociocommunautaires réalisées dans le cadre du projet TG-ANADEB-165404-CS- INDV / Audit technique des INFRA: Recrutement d'un Component 3:Capacity Individual consultant pour l'audit Under IDA / D1740 building and project Post Consultant Open 35,000.00 0.00 2020-12-15 2020-10-07 2021-02-02 2021-03-24 2021-02-23 2021-03-30 2021-05-29 technique des ouvrages Implementation management Selection sociocommunauataires réalisés dans le cadre du projet TG-ANADEB-209693-CS- INDV / Financements Component 3:Capacity Individual innovants Cantines: Sélection Under IDA / D1740 building and project Post Consultant Open 42,000.00 0.00 2020-12-31 2020-12-21 2021-02-18 2021-03-11 2021-04-15 2021-07-14 d'un cabinet pour l'étude sur Implementation management Selection les financements innovants des cantines scolaires TG-ANADEB-211871-CS- INDV / PROTECTION SOCIALE: Recrutement d’un consultant Component 3:Capacity Individual Under international pour le IDA / D1740 building and project Post Consultant Limited 60,000.00 0.00 2021-01-15 2021-01-06 2021-01-22 2021-02-03 2021-02-12 2021-03-19 2021-09-15 Implementation développement du management Selection programme de protection sociale du gouvernement TG-ANADEB-224313-CS- INDV / CGES _projet Cohésion sociale :recrutement d'un consultant pour l'élaboration Component 3:Capacity Individual du Cadre de Gestion Under IDA / D1740 building and project Post Consultant Limited 35,000.00 0.00 2021-03-25 2021-06-02 2021-04-01 2021-04-22 2021-05-27 2021-06-26 Environnementale et Sociale Implementation management Selection (CGES) intégrant le Plan de Gestion des Pestes et Pesticides (PGPP) du Projet de cohésion sociale (P175043) TG-ANADEB-224318-CS- INDV / CPR_projet Cohésion sociale: Recrutement d'un consultant pour l'élaboration Component 3:Capacity Individual Under du Cadre de Politique de IDA / D1740 building and project Post Consultant Limited 25,000.00 0.00 2021-03-30 2021-06-02 2021-04-06 2021-04-27 2021-06-01 2021-06-26 Implementation Réinstallation (CPR) du Projet management Selection de cohésion sociale pour les régions défavorisées du Golfe de Guinée (P175043) TG-ANADEB-224319-CS- INDV / PGMO_projet Cohésion sociale: Recrutement d'un consultant pour l'élaboration Component 3:Capacity Individual Under du Plan de Gestion de la Main IDA / D1740 building and project Post Consultant Limited 20,000.00 0.00 2021-03-30 2021-06-02 2021-04-06 2021-04-27 2021-06-01 2021-06-26 Implementation d’œuvre (PGMO) du Projet de management Selection cohésion sociale pour les régions défavorisées du Golfe de Guinée (P175043) Page 8 ANDHRA PRADESH INTEGRATED IRRIGATION AND AGRICULTURE TRANSFORMATION PROJECT Procurement Methods Procurement Approaches and Thresholds (US$ Equivalent) Methods Open international (goods, IT, and non- >3 million consulting services) Open national (goods, IT, and non- >100,000 and up to 3 million consulting services) National request for quotation Up to 100,000 (goods/works) Open international (works) >40 million Open national (works) >100,000 and up to 40 million Direct selection No threshold; For goods/works/non-consulting services: According to paragraphs 6.8–6.10 of the Regulations; For consultants: According to paragraphs 7.13–7.15 of the Regulations Framework Agreements For goods, works, and non-consulting services: According to paragraphs 6.57–6.59 of the Regulations Shortlist of national consultants Up to 800,000 1. Procurement prior-review thresholds based on the Moderate rating. The World Bank requires its prior review of the following types of contract: (a) Works: All contracts more than US$15 million equivalent (b) Goods and IT: All contracts more than US$4 million equivalent (c) Non-consulting services: All contracts more than US$4 million equivalent (d) Consultants: All contracts more than US$2 million equivalent for firms and US$400,000 equivalent for individuals (e) Direct selection: Justification of DS for all contracts more than US$100,000 equivalent 2. National procurement procedure conditions. National competition for the procurement of goods, works, and non-consulting services will be within the thresholds and will comply with the Procurement Provisions of paragraphs 5.3–5.6 of Section V of the Regulations and the following additional provisions: (a) Only the model bidding documents agreed with the World Bank (as amended from time to time) will be used for bidding. (b) At least 30 days before the deadline for submission of bids, invitations to bid will be advertised in at least one widely circulated national daily newspaper, or on a widely-used website or electronic portal with free national and international access inan abridged version of the advertisement published in a widely circulated national daily, giving details of the electronic portal where the full invitation to bid can be downloaded. (c) No preference will be accorded to any bidder for price or for other terms when competing with foreign bidders, state-owned enterprises, small- scale enterprises, or enterprises from a given state. (d) Extension of bid validity will not be allowed for contracts subject to World Bank prior review without prior World Bank concurrence (i) for the first request for an extension longer than four weeks and (ii) for all subsequent requests for extension whatever the length; concurrence will be considered only in cases of force majeure and other circumstances beyond the control of the purchaser employer. (e) There will be no re-bidding of contracts subject to World Bank prior review without prior World Bank concurrence. In this project, bids will not be rejected for being outside a predetermined range of prices. (f) To improve the efficiency and transparency of small-value purchases in WB-financed projects, the Bank has agreed to allow the following uses of Government e-Marketplace (GeM): (i) in lieu of shopping, up to US$30,000 in catalog mode; (ii) in lieu of shopping, up to US$100,000 if there are at least three suppliers for the item on GeM and the purchaser uses the GeM Request for Quotation feature (mini-competition) to discover the final price; (iii) in both cases, borrowers will record their assessment that the price is reasonable, and (iv) GeM is not to be used in lieu of National Competitive Bidding. (g) No negotiations are to be conducted even with the lowest evaluated responsive bidders. Domestic preference. Domestic preference will be applied in evaluating bids in accordance with Annex VI of the Regulations. PROCUREMENT India : AP Integrated Irrigation & Agriculture Transformation Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2020-09-23 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160463 GPN Date: Project Name: AP Integrated Irrigation & Agriculture Transformation Project Loan / Credit No: IBRD / 89100 Irrigation Circle, Ananthapuramu Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-ICANTPAPIIATP-194144- CW-RFB / Rehabilitation of Component A: Improving Under Sreedhargatta MI tank Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 97,853.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-10-20 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 (Independent) in Envelope 31 Efficiency ion Sreedhargatta (V) in Bommanahal (M) in Ananthapuramu District IN-ICANTPAPIIATP-194155- CW-RFB / Rehabilitation of Component A: Improving Apparas Cheruvu Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 304,448.00 0.00 Canceled 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 (Independent) in Apparas Envelope 31 Efficiency Cheruvu (V) in Bathalapalli (M) in Ananthapuramu District IN-ICANTPAPIIATP-194162- CW-RFB / Rehabilitation of Component A: Improving Under Hariyani cheruvu Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 148,466.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 (Independent) in Hariyani Envelope 31 Efficiency ion cheruvu (V) in C.K.Palli (M) in Ananthapuramu District IN-ICANTPAPIIATP-194231- CW-RFB / Rehabilitation of Component A: Improving Under Madigubba MI tank Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 146,166.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 (Independent) in Madigubba Envelope 31 Efficiency ion (V) in Atmakur (M) in Ananthapuramu District IN-ICANTPAPIIATP-194267- CW-RFB / Rehabilitation of Component A: Improving Under Gunipalli tank (Independent) Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 128,374.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 in Gunipalli (V) in Envelope 31 Efficiency ion Bukkapatnam (M) in Ananthapuramu District IN-ICANTPAPIIATP-194273- CW-RFB / Rehabilitation of Component A: Improving Under Jambuladinne tank Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 192,178.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 (Independent) in Envelope 31 Efficiency ion Jambuladinne (V) in Garladinne (M) in Ananthapuramu District IN-ICANTPAPIIATP-194276- CW-RFB / Rehabilitation of Component A: Improving Under Kandukuru chowti tank Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 168,252.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 (Independent) in Kandukuru Envelope 31 Efficiency ion (V) in Ananthapuramu(M) & District IN-ICANTPAPIIATP-194277- CW-RFB / Rehabilitation of Component A: Improving Under Single Stage - One 2021-07- Budili MI tank (Independent) IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 88,037.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 Envelope 31 in Budili (V) in Gorantla (M) Efficiency ion in Ananthapuramu District IN-ICANTPAPIIATP-194280- CW-RFB / Rehabilitation of Component A: Improving Under Single Stage - One 2021-07- Pulakunta tank (Independent) IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 89,877.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 Envelope 31 in Pulakunta (V) in Hindupur Efficiency ion (M) in Ananthapuramu District IN-ICANTPAPIIATP-194282- CW-RFB / Rehabilitation of Component A: Improving Under Kasaba MI tank( Kodur MI Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 160,276.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 tank) (Independent) in Kodur Envelope 31 Efficiency ion (V) in Chilamathur (M) in Ananthapuramu District IN-ICANTPAPIIATP-194287- CW-RFB / Rehabilitation of Budidhagaddapalli tank Component A: Improving Under Single Stage - One 2021-07- (Independent) in IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 127,301.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 Envelope 31 Budidhagaddapalli (V) in Efficiency ion Gorantla (M) in Ananthapuramu District IN-ICANTPAPIIATP-194290- CW-RFB / Rehabilitation of Component A: Improving Under Gorantla Big tank Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 180,368.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 (Independent) in Gorantla (V) Envelope 31 Efficiency ion in Gorantla (M) in Ananthapuramu District IN-ICANTPAPIIATP-194293- CW-RFB / Rehabilitation of Component A: Improving Under Grandham vani cheruvu Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 66,258.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 Cascade No.12 in Envelope 31 Efficiency ion Bandameeda palli(V) in Gandlapenta (M) in Ananthapuramu District IN-ICANTPAPIIATP-194335- CW-RFB / Rehabilitation of Component A: Improving Under Nyamaddala MI tank Single Stage - One 2021-07- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 217,638.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 (Independent) in Nyamaddala Envelope 31 Efficiency ion (V) in C.K.Palli (M) in Ananthapuramu District Page 1 IN-ICANTPAPIIATP-194345- CW-RFB / Rehabilitation of Component A: Improving Under Single Stage - One 2021-07- Yerra cheruvu (Independent) IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 123,160.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 Envelope 31 in Kanumukkala (V) in Efficiency ion C.K.Palli (M) in Ananthapuramu District IN-ICANTPAPIIATP-194352- CW-RFB / Rehabilitation of Ammagari Cheruvu Component A: Improving Under Single Stage - One 2021-07- (Independent) in IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 112,883.00 0.00 Implementat 2020-10-12 2020-10-12 2020-10-17 2020-11-28 2020-11-19 2020-12-28 2021-03-15 2021-02-01 Envelope 31 Santhekondapuram (V) in Efficiency ion Bramhasamudram (M) in Ananthapuramu District IN-ICANTPAPIIATP-225829- CW-RFB / Rehabilitation of Santhekondapuram MI tank Component A: Improving Pending Single Stage - One 2022-01- Cascade No-32 in IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 313,804.00 0.00 Implementat 2021-04-12 2021-04-17 2021-05-29 2021-06-28 2021-08-02 Envelope 29 Santhekondapuram (V) in Efficiency ion Brahmasamudram (M) in Ananthapuramu (dist) IN-ICANTPAPIIATP-225974- CW-RFB / Rehabilitation of Component A: Improving Pending Bachupalli MI tank Cascade Single Stage - One 2022-01- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 328,221.00 0.00 Implementat 2021-04-12 2021-04-17 2021-05-29 2021-06-28 2021-08-02 No-29 in Bachupalli (V) in Envelope 29 Efficiency ion Gooty (M) in Ananthapuramu (dist) IN-ICANTPAPIIATP-225978- CW-RFB / Rehabilitation of Component A: Improving Pending Single Stage - One 2022-01- B.Yaleru MI tank IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 618,712.00 0.00 Implementat 2021-04-12 2021-04-17 2021-05-29 2021-06-28 2021-08-02 Envelope 29 (Independent) in B.Yaleru (V) Efficiency ion in Atmakur (M) in Ananthapuramu District IN-ICANTPAPIIATP-225987- CW-RFB / Rehabilitation of Component A: Improving Pending Nidragatta MI tank Single Stage - One 2022-01- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National 410,276.00 0.00 Implementat 2021-04-12 2021-04-17 2021-05-29 2021-06-28 2021-08-02 (Independent) in Nidragatta Envelope 29 Efficiency ion (V) in Amarapuram (M) in Ananthapuramu District IN-ICANTPAPIIATP-236484- National CW-RFB / Rehabilitation of Component A: Improving Procurement Pending Apparas Cheruvu Single Stage - One 2022-09- IBRD / 89100 Irrigated Agriculture Post Request for Bids Open - National Document - 1 304,448.00 0.00 Implementat 2021-06-07 2021-06-12 2021-07-24 2021-08-23 2021-09-27 (Independent) in Apparas Envelope 26 Efficiency Envelope process ion Cheruvu (V) in Bathalapalli (Non Bank-SPD) (M) in Ananthapuramu District GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 RÉPUBLIQUE GABONAISE (Union-Travail-Justice) MINISTÈRE DE L’ÉCONOMIE ET DES FINANCES COMMISSION NATIONALE DES TIPPEE SECRETARIAT PERMANENT PROJET DE PREPARATION STRATEGIQUE ET DE RIPOSTE AU COVID-19 Financement : BIRD | ID : P173927 PLAN DE PASSATION DE MARCHÉS (Texte) Information sur le Projet : P173927 - Projet de Préparation et de riposte Stratégiques au COVID-19 (PPRS) du Gabon Agence d’exécution du Projet : Commission Nationale des Travaux d’Intérêt Public pour la Promotion de l’Entreprenariat et l’Emploi (CNTIPPEE) Date du plan de passation des marchés : 07 mai 2020 Période couverte par ce plan de passation des marchés : mai 2020 à avril 2021 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) révisé en Novembre 2017 puis en Août 2018 (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marché se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le Code des Marchés Publics, Décret n°00027/PR/MEPPDD du 17 janvier 2018, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : a. publication de l'appel d’offres/à propositions au niveau national ; b. les entreprises éligibles de tout pays peuvent concourir ; c. le dossier d'appel d'offres/à propositions oblige le Soumissionnaire/Proposant présentant une Offre/Proposition à déposer un agrément signé qui sera joint à tout contrat éventuel, pour confirmer qu'il applique et respecte les Directives de la Banque pour la lutte contre la corruption y compris sans limitation. Le droit de la Banque de sanctionner et les droits de la Banque pour l'inspection et l'audit ; d. les marchés doivent comporter une répartition appropriée des attributions, risques et responsabilités ; e. la publication des informations relatives à l'attribution du marché ; f.les droits de la Banque d’examiner le dossier et les activités de passation des marchés ; g. l'existence d'un mécanisme efficace d'examen des plaintes ; et h. la gestion et l'archivage des dossiers relatifs au Processus de la Passation des Marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. Sans objet. Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. Sans objet. Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés. Travaux ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés. L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique : 3.10La Banque peut accepter d'apporter une assistance directe à la mise œuvre des activités de passation des marchés lorsqu'elle juge que ('Emprunteur/le bénéficiaire ou, le cas échéant, le pays membre : a. est dans un besoin urgent d'assistance en raison d'une catastrophe d'origine naturelle ou humaine, ou d'un conflit ; ou b. se heurte à des problèmes de capacités du fait de sa fragilité ou de vulnérabilités particulières (petits Etats, par exemple). 3.11La Banque détermine, au cas par cas, le champ et la nature de cet appui. Celui-ci ne l'amène pas à exécuter les opérations de passation des marchés en lieu et place de l'Emprunteur, qui reste responsable de l'exécution du projet. Autres informations pertinentes sur la passation des marchés : Sans objet. Approche du Montant % Date de Catégorie marché/ estimé financ démarrage Numéro Compétition Méthode de Type de prévue de é par Description de passation de (Dollars revue passation la Référence marché US) (jj/mm/aaaa) de marché Banqu e Fournitures GA-CN TIPPEE-169285-GO-UN / Acquisition équipement de protection, test/équipement de laboratoire, Go-Ref 1 GO Direct UN 6 300 000,00 100 Post 2020/05/25 ambulances médicalisées, formation personnel de santé – réponse au COVID19 GA-CN TIPPEE-172487-GO-DIR / Fourniture d’internet et téléphonie Go-Ref 2 GO Direct DIR 10 000,00 100 Post 2020/06/20 mobile Services de consultants GA-CN TIPPEE-172488-CS-QCBS / Open - Auditeur comptable et financier CS-Ref 1 CS QCBS 60 000,00 100 Post 2020/12/23 International 2020,2021 et clôture GA-CN TIPPEE-172490-CS-CDS / Audit CS-Ref 2 CS Direct CDS 130 000,00 100 Post 2020/07/20 global réponse au COVID19 CS-Ref 3 CS Non-consulting Services GA-CN TIPPEE-172653-NC-RFQ / NC-Ref 3 NC CF RFQ 50 000,00 Post 2020/06/27 Logistique, transporteur et dispatching PROCUREMENT Gabon : GABON COVID-19 Strategic Preparedness and Response Project (SPRP) PLAN General Information Country: Gabon Bank’s Approval Date of the Original Procurement Plan: 2020-05-07 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173927 GPN Date: Project Name: GABON COVID-19 Strategic Preparedness and Response Project (SPRP) Loan / Credit No: IBRD / 91240 COMMISSION NATIONALE DES TIPPEE Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GA-CN TIPPEE-169285-GO- UN / Acquisition équipement de protection, test/équipement de Component 1: Emergency UN Agencies IBRD / 91240 Post Direct 6,300,000.00 6,240,052.49 Signed 2020-05-08 2020-05-17 2020-05-13 2020-05-22 2020-05-25 2020-05-25 2020-11-21 laboratoire, ambulances COVID-19 Response (Direct) médicalisées, formation personnel de santé – réponse au COVID19 GA-CN TIPPEE-172487-GO- Component 3: Project Under DIR / Fourniture d’internet et IBRD / 91240 Implementation and Post Direct Selection Direct 10,000.00 0.00 Implementati 2020-11-02 2020-11-03 2020-11-07 2020-12-12 2021-06-10 téléphonie mobile Monitoring on GA-CN TIPPEE-195897-GO- Component 2: Supporting Request for Single Stage - One RFQ / Acquisition de IBRD / 91240 National and Sub-national, Post Limited 410,000.00 355,982.96 Signed 2020-09-25 2020-09-25 2020-10-09 2020-10-15 2021-04-07 Quotations Envelope consommables médicaux Prevention and Preparedness GA-CN TIPPEE-195892-GO- Component 2: Supporting RFQ / Acquisition de Request for Single Stage - One IBRD / 91240 National and Sub-national, Post Limited 1,000,000.00 1,430,295.74 Signed 2020-09-26 2020-09-25 2020-10-17 2020-10-15 2021-04-15 médicaments et autres Quotations Envelope Prevention and Preparedness produits de santé GA-CN TIPPEE-195903-GO- Component 3: Project RFQ / Acquisition Matériel Request for Single Stage - One IBRD / 91240 Implementation and Post Limited 17,000.00 47,112.35 Signed 2020-09-30 2020-11-02 2020-10-12 2020-11-11 2020-12-11 Informatique pour la Cellule Quotations Envelope Monitoring FINEX GA-CN TIPPEE-195905-GO- RFQ / Acquisition de quatre Component 3: Project Request for Single Stage - One (4) Véhicules pour les activités IBRD / 91240 Implementation and Post Limited 150,000.00 0.00 Canceled 2020-09-25 2020-10-15 2020-12-14 Quotations Envelope de la Cellule de Suivi Monitoring Evaluation du COPIL GA-CN TIPPEE-195902-GO- Component 3: Project RFQ / Acquisition Matériel Request for Single Stage - One IBRD / 91240 Implementation and Post Limited 26,000.00 118,965.89 Signed 2020-11-08 2020-12-09 2020-11-28 2021-03-25 2021-01-27 Informatique pour la Cellule Quotations Envelope Monitoring de Suivi Evaluation du COPIL GA-CN TIPPEE-201737-GO- Component 3: Project Under DIR / Fourniture de carburant IBRD / 91240 Implementation and Post Direct Selection Direct 11,000.00 0.00 Implementati 2020-11-02 2020-11-03 2020-11-04 2020-11-12 2021-05-11 à l'UCP Monitoring on GA-CN TIPPEE-201726-GO- DIR / Acquisition de six (6) Component 3: Project Véhicules pour les activités de IBRD / 91240 Implementation and Post Direct Selection Direct 166,000.00 269,845.50 Completed 2020-11-05 2020-11-03 2020-11-07 2020-11-09 2020-11-10 2020-11-11 2021-01-09 2021-01-08 la Cellule de Suivi Evaluation Monitoring du COPIL et la Cellule FINEX GA-CN TIPPEE-238804-GO- Component 3: Project Pending DIR / Fourniture du carburant IBRD / 91240 Implementation and Post Direct Selection Direct 5,600.00 0.00 Implementati 2021-06-08 2021-06-09 2021-06-11 2021-12-08 à la Cellule Finex Monitoring on GA-CN TIPPEE-238917-GO- Component 3: Project Pending RFQ / Fourniture des outils de Request for Single Stage - One IBRD / 91240 Implementation and Post Limited 10,000.00 0.00 Implementati 2021-06-23 2021-07-14 2021-07-23 communication pour le PPRS Quotations Envelope Monitoring on COVID-19 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GA-CN TIPPEE-172653-NC- Pending Component 1: Emergency Request for Single Stage - One RFQ / Logistique, transporteur IBRD / 91240 Post Limited 50,000.00 0.00 Implementati 2020-12-03 2021-01-03 2021-07-02 COVID-19 Response Quotations Envelope et dispatching on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GA-CN TIPPEE-172488-CS- Component 3: Project Quality And Cost- Under QCBS / Auditeur comptable et IBRD / 91240 Implementation and Post Open - National 60,000.00 0.00 2020-11-10 2021-04-10 2020-11-17 2020-12-08 2021-01-07 2021-01-14 2021-01-28 2021-02-09 2022-02-09 Based Selection Implementation financier 2020,2021 et clôture Monitoring GA-CN TIPPEE-183997-CS- Component 3: Project Quality And Cost- Pending QCBS / Audit global réponse IBRD / 91240 Implementation and Post Open - National 130,000.00 0.00 2021-08-02 2021-08-09 2021-09-22 2021-10-22 2021-10-29 2021-11-12 2021-11-24 2022-03-24 Based Selection Implementation au COVID19 Monitoring Page 1 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GA-CN TIPPEE-183699-CS- INDV / Recrutement d’un Component 3: Project Individual Consultant Individuel pour IBRD / 91240 Implementation and Post Consultant Limited 85,000.00 48,528.74 Signed 2020-07-15 2020-07-13 2020-07-18 2020-07-15 2020-07-22 2020-08-19 2020-07-26 2020-08-20 2020-09-24 l’élaboration d’un Cadre de Monitoring Selection Gestion environnementale et Sociale GA-CN TIPPEE-195898-CS- Component 3: Project Individual INDV / Recrutement d’un IBRD / 91240 Implementation and Post Consultant Open 32,000.00 0.00 Canceled 2020-11-21 2020-12-17 2020-12-19 2020-12-22 2021-12-17 Comptable pour le projet Monitoring Selection COVID-19 GA-CN TIPPEE-195900-CS- INDV / Recrutemnt d’un Component 3: Project Individual Expert pour le suivi IBRD / 91240 Implementation and Post Consultant Limited 26,000.00 22,257.24 Signed 2020-11-24 2021-01-14 2020-12-01 2021-02-04 2020-12-06 2021-05-10 2020-12-09 2021-05-10 2021-06-07 épidémiologique pour la Monitoring Selection Risposte au COVID-19 GA-CN TIPPEE-222184-CS- Component 3: Project CDS / Recrutement d’une Pending IBRD / 91240 Implementation and Post Direct Selection Direct 30,000.00 0.00 2021-12-01 2021-12-04 2021-12-07 2022-06-05 Assistante de Direction pour Implementation Monitoring le projet COVID-19 GA-CN TIPPEE-238900-CS- Component 3: Project Individual INDV / Recrutement d’un Pending IBRD / 91240 Implementation and Post Consultant Limited 35,000.00 0.00 2021-06-09 2021-06-10 2021-06-11 2021-06-13 2021-08-12 Auditeur Environnemental et Implementation Monitoring Selection Social GA-CN TIPPEE-238904-CS- Component 3: Project Individual INDV / Recrutement d’un Pending IBRD / 91240 Implementation and Post Consultant Limited 30,000.00 0.00 2021-06-10 2021-06-12 2021-06-14 2021-06-18 2021-12-15 spécialiste environnemental Implementation Monitoring Selection pour le projet GA-CN TIPPEE-238906-CS- INDV / Recrutement d’un consultant Spécialiste en Component 3: Project Individual Élaboration de la Stratégie de Pending IBRD / 91240 Implementation and Post Consultant Direct 25,000.00 0.00 2021-06-09 2021-06-11 2021-06-12 2021-06-14 2021-09-12 Passation de Marchés pour Implementation Monitoring Selection promouvoir le Développement (PPSD) pour le projet PPRS - P173927 GA-CN TIPPEE-238915-CS- Component 3: Project Individual INDV / Recrutement d’un Pending IBRD / 91240 Implementation and Post Consultant Open 65,000.00 0.00 2021-06-10 2021-06-17 2021-06-19 2021-06-21 2022-05-27 Auditeur Interne pour les Implementation Monitoring Selection projets de la CN-TIPPEE Page 2 Lao PDR: Agriculture Competitiveness Project Procurement Plan (as of December 21, 2017) 1. Project information: Country: Lao PDR Borrower/Recipient: Lao PDR Project Name: Agriculture Competitiveness Project Project ID No: P161473 Project Implementing Agency: Ministry of Agriculture and Forestry (MAF) 2. Bank’s approval date of the Procurement Plan • Original Plan: December 21, 2017 • First Revision: 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: at least 18 months I. Works and Goods and Non-Consultant Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Category Applicable thresholds Remarks thresholds Remarks (in US$ (in US$) equivalent) Works RFB through ≥ 2.0 million – Above US$ 10 This has not been Open million foreseen at the International project preparation market approach stage. RFB through ≥ 200,000 < – None - Open National 2.0 million market approach Request for < 200,000 – None – Quotation Direct Selection None No threshold; Same as for This has not been meet competitive foreseen at the requirements of selection project preparation regulations 7.13- stage. 7.15 Goods and Non-Consulting Services RFB through ≥ 0.6 million – Above US$ 2 This has not been Open million foreseen at the International project preparation market approach stage. RFB through ≥ 100,000 < - None Risk-based approach Open National 0.6 million market approach Request for < 100,000 None Quotation 1 Direct Selection None No threshold; Same as for This has not been meet competitive foreseen at the requirements of selection project preparation regulations 7.13- stage. 7.15 2. Prequalification. Not expected for the works/goods packages. 3. Any Other Special Procurement Arrangements: National procurement procedures as specified under paragraph 5.4 of the Procurement Regulations and the conditions specified in Annex 1 to this Procurement Plan 4. Leased assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. 5. Procurement of second hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable. 6. Hands-on Expanded Implementation Support (HEIS) as specified under paragraph 3.10 and 3.11 of the Procurement Regulations: Not applicable. 7. Procurement packages for Goods (prior and post reviews) with method and Time Schedule Revi Expect Contract Procurement ew ed Estima Bids by Ref. (Description) ted Method Openi Commen Bank No. Cost ng ts (US$) (Prio r/ Date Post) Khammouane Upgrade of infrastructure KM/W- Request for Execute for KM PAFO for seed, GAP 30,000 Post Sep-18 RFQ 01 Quotation by PAFO and general extension Upgrade of infrastructure KM/W- Request for Sep Execute for KM DAFOs for seed 30,000 Post RFQ 02 Quotation 20118 by PAFO and GAP Upgrade of critical RFB (National) / KM/W- Execute productive infrastructure 900,000 Request for Post Jun-19 RFB 01 by PAFO in KM (multiple contracts) Quotation Equipment for KM Execute KM/G- Request for PAFO/DAFO for seed and 21,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF Bolikhamxay Upgrade of infrastructure BLK/W- Request for Sep Execute for BLK for seed, GAP and 30,000 Post RFQ 01 Quotation 20117 by PAFO general extension Upgrade of infrastructure BLK/W- Request for Execute for BLK DAFOs for seed 30,000 Post Sep-18 RFQ 02 Quotation by PAFO and GAP Upgrade of critical RFB (National) / BLK/W- productive infrastructure Sep Execute 900,000 Request for Post RFB 01 in BLK (multiple 20118 by PAFO Quotation contracts) Equipment for BLK Execute BLK/G- Request for PAFO/DAFO for seed and 21,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF 2 Revi Expect Contract Procurement ew ed Vientiane Capital Estima Ref. ted Commen Upgrade of infrastructure VC/W- No. Cost Request for Execute ts for VC for seed, GAP and 30,000 Post Sep-18 RFQ 01 (US$) Quotation by PAFO general extension Upgrade of infrastructure VC/W- Request for Sep Execute for VC DAFOs for seed 40,000 Post RFQ 02 Quotation 20118 by PAFO and GAP Upgrade of critical RFB (National) / VC/W- Execute productive infrastructure 900,000 Request for Post Sep-18 RFB 01 by PAFO in VC (multiple contracts) Quotation Equipment for VC Execute VC/G- Request for PAFO/DAFO for seed and 23,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF Vientiane Province Upgrade of infrastructure VP/W- Request for Execute for VP PAFO for seed, GAP 30,000 Post Sep-18 RFQ 01 Quotation by PAFO and general extension Upgrade of infrastructure VP/W- Request for Execute for VP DAFOs for seed and 20,000 Post Sep-18 RFQ 02 Quotation by PAFO GAP Upgrade of critical RFB (National) / VP/W- 1,000,0 Execute productive infrastructure Request for Post Sep-18 RFB 01 00 by PAFO in VP (multiple contracts) Quotation Equipment for VP Execute VP/G- Request for PAFO/DAFO for seed and 21,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF Xayabouly Upgrade of infrastructure XYL/W- for XYL PAFO for seed, Request for Execute 30,000 Post Sep-18 RFQ 01 GAP and general Quotation by PAFO extension Upgrade of infrastructure XYL/W- Request for Sep Execute for XYL DAFOs for seed 40,000 Post RFQ 02 Quotation 20118 by PAFO and GAP Upgrade of critical RFB (National) / XYL/W- Execute productive infrastructure 900,000 Request for Post Sep-18 RFB 01 by PAFO in VP (multiple contracts) Quotation Equipment for XYL Execute XYL/G- Request for PAFO/DAFO for seed and 23,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF MAF Execute MAF/W Request for by -RFQ Seed storage at NAFRI 70,000 Post Sep-18 Quotation NAFRI/MA 01 F Execute MAF/G- Machine and equipment Request for by 20,000 Post Sep-18 RFQ 01 for NAFRI-ARC Quotation NAFRI/MA F MAF/G- Machine and equipment Request for Execute 25,000 Post Sep-18 RFQ 02 for NAFRI- HRC Quotation by MAF MAF/G- Request for Execute Lab equipment for DOA 20,000 Post Dec-18 RFQ 03 Quotation by MAF MAF/G- Equipment for DOA Clean Request for Execute 20,000 Post Dec-18 RFQ 04 Agriculture Dev. Center Quotation by MAF MAF/G- Extension materials for Request for Execute 10,000 Post Sep-18 RFQ 05 DOA Quotation by MAF 3 Revi Expect Contract Procurement ew ed MAF/G- Extension materials for Estima Request for Execute 50,000 Post Sep-18 Ref. RFQ 06 DAEC ted Quotation Commen by MAF No. Rapid test kits and Cost ts MAF/G- (US$) Request for Execute chemicals and reagents 9,000 Post Sep-18 RFQ 07 Quotation by MAF for DOA Office equipment for MAF, MAF/G- Request for Execute MOIC, 5 provinces and 133,200 Post Sep-18 RFQ 08 Quotation by MAF districts MAF/G- Motorbikes for Provinces, Request for Execute 84,000 Post Sep-18 RFQ 09 MAF and MOIC (42 units) Quotation by MAF MAF/G- Pick-up for 5 provinces, Execute 630,000 RFB (National) Post Sep-18 RFB 01 MAF and MOIC (14 units) by MAF 6,090, Total Works and Goods 200 4 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Applicable Category thresholds thresholds Remarks Remarks (in US$ (in US$, equivalent) millions) QCBS, QBS, FBS, ≥ 300,000 Shortlist of only ≥ 1.0 million Risk-based LCS (Using the National Consultants approach most appropriate (Firms) for contract market agreed in the PP approach) CQS (Open or < 300,000 QCBS, QBS, FBS, None limited LCS) can be applied competition for contracts with through national value under or international $300,000 market approach, specified in the PP and agreed with the Bank. Direct Selection None No threshold; meet Same as for This has not been of firms requirements of competitive foreseen at the regulations 7.13- selection project preparation 7.15 stage. Individual N/A depending Essential individual ≥ 300,000 and Risk-based Consultants on nature of assignments will be for the positions approach services defined in the as specified in Procurement Plan the PP agreed agreed with the with the Bank Bank and in line with regulations 7.34- 7.39 using the most appropriate market approach 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 7.1, Section VII of the Procurement Regulations. 5 3. Consultancy Assignments with Selection Methods and Time Schedule Estimat Selecti Revi Expecte ed on ew d Proposa Metho by ls Description of Cost Ref. No. d Bank Submiss Comments Assignment ion (Prio US$ r/ Date Post) Khammouane Technical consultant for Execute by KM/IC-01 KM PAFO in extension 120,000 IC Post Jun-18 MAF services Technical assistance for Execute by KM/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in KM Technical assistance to Execute by KM/IC-03 120,000 IC Post Jul-18 KM PICO MAF Project accountant for KM Execute by KM/IC-04 66,000 IC Post Mar-18 PAFO MAF Bolikhamxay Technical consultant for Execute by BLK/IC-01 BLK PAFO in extension 120,000 IC Post Jun-18 MAF services Technical assistance for Execute by BLK/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in BLK Technical assistance to Execute by BLK/IC-03 120,000 IC Post Jul-18 BLK PICO MAF Project accountant for BLK Execute by BLK/IC-04 66,000 IC Post Mar-18 PAFO MAF Vientiane Capital Technical consultant for Execute by VC/IC 01 VC PAFO in extension 120,000 IC Post Jun-18 MAF services Technical assistance for Execute by VC/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in VC Technical assistance to VC Execute by VC/IC-03 120,000 IC Post Jul-18 PICO MAF Project accountant for VC Execute by VC/IC-04 66,000 IC Post Mar-18 PAFO MAF Vientiane Province Technical consultant for Execute by VP/IC-01 VP PAFO in extension 120,000 IC Post Jun-18 MAF services Technical assistance for Execute by VP/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in VP Technical assistance to VP Execute by VP/IC-03 120,000 IC Post Jul-18 PICO MAF Project accountant for VP Execute by VP/IC-04 66,000 IC Post Mar-18 PAFO MAF Xayabouly 6 Estimat Selecti Revi Expecte ed on ew d Technical consultant for XYL /IC- Execute by XBL PAFO in extension 120,000 IC Post Jun-18 01 Description of MAF Ref. No. services Comments Assignment Technical assistance for Execute by XYL/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in XYL Technical assistance to Execute by XYL/IC-03 120,000 IC Post Jul-18 XYL PICO MAF Project accountant for XYL Execute by XYL/IC-04 66,000 IC Post Mar-18 PAFO MAF MAF SSS/QB S TA for AB Matching Grants (Qualit MAF/QBS- Management and Execute by 600,000 y Post Sep-18 01 Capacity Building for rice MAF Based mills Selecti on) SSS MAF/SSS- Technical assistance to Execute by 770,000 (with Post Sep-18 01 support implementation (1) MAF FAO) Completed MAF/SSS- Environment safeguard (Keoduangc 84,000 SSS Post Aug-17 hay 02 specialist (DoPF) Keokhamph ui) Completed MAF/SSS- Social safeguard specialist 84,000 SSS Post Aug-17 (Bounhome 03 (DoPF) Phothimath) MAF/SSS- Monitoring and evaluation Execute by 132,000 SSS Post Jul-18 04 specialist (DoPF) MAF Completed MAF/SSS- Finance management 132,000 SSS Post Aug-17 (Khayta 05 specialist* (DoPF) Sithivong) Completed MAF/SSS- Procurement specialist (Keophouth 120,000 SSS Post Aug-17 06 (DoPF) one Inthivong) Local Consultant on MAF/IC- Execute by Survey-Design of 144,000 IC Post Jun-18 01 MAF irrigation system (DOI) Local Consultant on MAF/IC- Execute by strengthening of WUA and 180,000 IC Post Jun-18 02 MAF O&M (DOI) Study on integrated MAF/IC- farming Execute by 30,000 IC Post Jul-18 03 systems/diversification for MAF nutrition MAF/IC- National Project Advisor Execute by 198,000 IC post Mar-18 04 (DoPF) MAF International Project MAF/IC- Execute by Advisor (Project 225,000 IC post Mar-18 05 MAF management DoPF) MAF/IC- Execute by Accountant – chief 132,000 IC Post Mar-18 06 MAF MAF/IC- Execute by Accountant- assistant 66,000 IC Post Mar-18 07 MAF 7 Estimat Selecti Revi Expecte ed on ew d MAF/IC- Execute by Accountant- assistant 66,000 IC Post Mar-18 08 MAF Description of Ref. No. MAF/IC- Comments Execute by Assignment Cashier – assistant 66,000 IC Post Mar-18 09 MAF MAF/IC- Administrative staff – Execute by 66,000 IC Post Mar-18 10 assistant MAF MAF/IC- Execute by Procurement assistant 66,000 IC Post Mar-18 11 MAF MAF/IC- Project Advisor (part time) Execute by 72,000 IC Post Jul-18 12 for MOIC DOPC MAF MAF/IC- Administrative staff for Execute by 46,000 IC Post Jul-18 13 MOIC DOPC MAF Nutrition social behavior MAF/CQS- Execute by change communication 400,000 CQS Prior Jul-18 01 MAF (SBBC) MAF/CQS- Panel of Expert – Dam Execute by 100,000 CQS Post Jul-18 02 Safety MAF MAF/CQS- TA firm for baseline, mid- Execute by 180,000 CQS Post Mar-18 03 term and final assessment MAF MAF/CQS- Execute by DOPF - Project Audits* 180,000 CQS Post Dec-18 04 MAF 5,919,0 Total consulting services 00 Total Works, Goods and 12,009, Consulting Services 200 1 Consultants under FAO SSS package: Estimated Position Cost (USD) FAO-Int 01 Int. Policy on seed management (MAF DoPF) 15,000 FAO-Int 02 Int. Nutrition Specialist (MAF DoPF) 45,000 FAO-Int 03 Int. Crop/GAP Specialist (MAF DoPF) 45,000 FAO-Int 04 Int. Institutional Specialist (MAF DoPF) 45,000 FAO-Int 05 Int. consultant to develop MIS system (MoIC) 60,000 FAO-Int 06 Int. consultant on rice mill standard promotion policy (MoIC) 45,000 Int. consultant to review and develop rice export strategy FAO-Int 07 45,000 (MoIC) FAO-Int 08 Int. TA for Preparing for GMP and HACCP certification (MoIC) 15,000 FAO-Int 09 Int. consultant to develop guidelines on Quality Mark (MoIC) 45,000 Subtotal International Consultants 360,000 FAO-Nat DOA - Technical Consultant for certification of organic 108,000 01 production and GAP (MAF) FAO-Nat DAEC - Technical Consultant on seed certification for R3 (MAF) 108,000 02 FAO-Nat DALAM -Technical Consultant on organic fertilization (MAF) 108,000 03 FAO-Nat Develop a system for M&E and reporting on SPS (MAF) 10,000 04 FAO-Nat Improve the system of plant quarantine inspection (MAF) 12,000 05 FAO-Nat DIMEX- National consultant on Rice import and export 24,000 06 legislations (MOIC) FAO-Nat DOSMEP - National consultant on GMP, HACCP (MOIC) 30,000 07 8 FAO-Nat DOTP - Promotion of Quality Mark (MOIC) 10,000 08 Subtotal National Consultants 410,000 GRAND TOTAL 770,000 * Although these packages are subject to procurement Post Review, the World Bank will do prior technical review or the EOI evaluation reports and draft negotiated contracts. 9 Annex 1 - Additional National Procurement Provisions. Procurement under National Procurement Procedures will be carried out in accordance with national regulations including the Procurement Decree #03, dated January 9, 2004 and Implementation Rule and Regulations (IRR) #0063 issued by MOF on March 12, 2004 and #0861/MOF, dated May 5, 2009 (amended version); Procurement Manual dated May 2009 and harmonized bidding documents for national competitive bidding and request for quotations agreed between Government of Lao PDR, World Bank and Asia Development Bank. In addition to the provisions stipulated in the above documents, Government and Implementing agencies for Bank financed projects shall implement the following additional provisions: i. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; ii. Information related to award of contract including reasons for rejection of unsuccessful bidders shall be published on the implementing agency websites and/or newspaper of wide circulation. iii. All complaints on procurement related matters including complaints arising from procurement under Bank financed Projects whilst using National Procurement Procedures shall be dealt with in accordance with Article 33 of the Procurement Decree. Borrower shall put in place an effective complaints review mechanism for dealing with procurement related complaints, and shall disclose the details in all the bidding documents. All complaints shall be recorded by the Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. 10 PROCUREMENT Lao People's Democratic Republic : Agriculture Competitiveness Project PLAN General Information Country: Lao People's Democratic Republic Bank’s Approval Date of the Original Procurement Plan: 2017-07-20 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161473 GPN Date: 2018-10-17 Project Name: Agriculture Competitiveness Project Loan / Credit No: IDA / V0940, IDA / 62050 D Executing Agency(ies): epartment of Planning and Cooperation, Ministry of Agriculture and Forestry WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MAF/W-RFQ02 / Office Request for Single Stage - One 2019-03- Renovation and Extension of IDA / 62050 C. Project Management Post Limited 22,000.00 21,484.34 Signed 2018-08-04 2018-07-30 2018-09-29 2018-09-24 Quotations Envelope 28 CPMO KM/W- RFQ 01 / Upgrade of infrastructure for KM PAFO for A. Improved Agricultural Request for Single Stage - One 2019-08- IDA / 62050 Post Limited 30,000.00 29,862.49 Signed 2018-12-08 2018-11-13 2019-02-02 2018-12-11 seed, GAP and general Efficiency and Sustainability Quotations Envelope 01 extension KM/W-RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for KM DAFOs IDA / 62050 Post Limited 30,000.00 29,944.02 Signed 2018-12-08 2018-12-04 2019-02-02 2019-01-04 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP BLK/W-RFQ 01 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for BLK for IDA / 62050 Post Limited 30,000.00 29,821.38 Signed 2018-12-08 2018-12-11 2019-02-02 2019-01-04 Efficiency and Sustainability Quotations Envelope 01 seed, GAP and general extension BLK/W-RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for BLK DAFOs IDA / 62050 Post Limited 30,000.00 9,889.69 Signed 2018-12-08 2018-12-05 2019-02-02 2019-01-04 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP VC/W- RFQ 01 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for VC for seed, IDA / 62050 Post Limited 30,000.00 29,644.13 Signed 2018-12-08 2018-11-20 2019-02-02 2018-12-14 Efficiency and Sustainability Quotations Envelope 01 GAP and general extension VC/W- RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for VC DAFOs IDA / 62050 Post Limited 40,000.00 28,541.17 Signed 2018-12-08 2019-01-30 2019-02-02 2019-03-01 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP VP/W- RFQ 01 / Upgrade of infrastructure for VP PAFO for A. Improved Agricultural Request for Single Stage - One 2019-08- IDA / 62050 Post Limited 30,000.00 50,450.60 Signed 2018-12-08 2018-12-24 2019-02-02 2019-01-16 seed, GAP and general Efficiency and Sustainability Quotations Envelope 01 extension VP/W- RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for VP DAFOs IDA / 62050 Post Limited 20,000.00 50,450.60 Signed 2018-12-08 2018-12-24 2019-02-02 2019-01-16 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP XYL/W- RFQ 01 / Upgrade of infrastructure for XYL PAFO A. Improved Agricultural Request for Single Stage - One 2019-08- IDA / 62050 Post Limited 30,000.00 30,697.50 Signed 2018-12-08 2018-12-10 2019-02-02 2019-01-14 for seed, GAP and general Efficiency and Sustainability Quotations Envelope 01 extension XYL/W- RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for XYL DAFOs IDA / 62050 Post Limited 40,000.00 42,698.20 Signed 2018-12-08 2019-02-04 2019-02-02 2019-02-22 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP XYL/W- RFQ 01.1 / Upgrade of critical productive A. Improved Agricultural Request for Single Stage - One 2021-05- IDA / 62050 Post Open - National 121,387.08 50,556.62 Signed 2020-10-06 2020-12-01 2020-12-03 infrastructure (Nam Ngeum 2) Efficiency and Sustainability Quotations Envelope 30 in Xienghone District XYL/W- RFQ 01.4 / Upgrade of critical productive A. Improved Agricultural Request for Single Stage - One 2021-05- IDA / 62050 Post Open - National 55,110.45 111,926.29 Signed 2020-10-06 2020-12-01 2020-12-03 infrastructure (Na Ngao) in Efficiency and Sustainability Quotations Envelope 30 Xayabuly District XYL/W- RFQ 01.5 / Upgrade Pending of critical productive A. Improved Agricultural Request for Single Stage - One 2021-12- IDA / 62050 Post Open - National 36,664.21 0.00 Implementat 2021-05-06 2021-07-01 infrastructure (Na La) in Efficiency and Sustainability Quotations Envelope 28 ion Xayabuly District XYL/W- RFQ 01.7 / Upgrade Pending of critical productive A. Improved Agricultural Request for Single Stage - One 2021-12- IDA / 62050 Post Open - National 196,899.10 0.00 Implementat 2021-05-06 2021-07-01 infrastructure (Nam Tan) in Efficiency and Sustainability Quotations Envelope 28 ion Phieng District KM/W-RFQ 01.5 / Upgrade of Pending critical productive A. Improved Agricultural Request for Single Stage - One 2021-12- IDA / 62050 Post Open - National 51,200.27 0.00 Implementat 2021-05-06 2021-07-01 infrastructure in (Ban Mahaxay Efficiency and Sustainability Quotations Envelope 28 ion Neua) Mahaxay District BLK/W-RFQ 01.1 / Upgrade of critical productive A. Improved Agricultural Request for Single Stage - One 2021-11- IDA / 62050 Post Open - National 168,880.99 157,685.59 Signed 2021-04-06 2021-06-01 2021-04-20 infrastructure in (Ban Pak Efficiency and Sustainability Quotations Envelope 28 Peung 1-3) Paksan District GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MAF/G-RFQ 08 / Office Single Stage - One equipment for MAF, MOIC, 5 IDA / 62050 C. Project Management Post Request for Bids Open - National 133,200.00 75,416.00 Signed 2018-09-01 2019-01-08 2018-09-06 2018-10-18 2019-01-30 2018-11-17 2019-01-30 2018-12-22 2019-02-14 2019-06-20 Envelope provinces and districts Page 1 MAF/G- RFQ 09 / Motorbikes Single Stage - One for Provinces, MAF and MOIC IDA / 62050 C. Project Management Post Request for Bids Open - National 84,000.00 57,680.00 Signed 2018-12-01 2019-03-26 2018-12-06 2019-01-17 2019-04-25 2019-02-16 2019-04-29 2019-03-23 2019-05-31 2019-09-19 Envelope (42 units) MAF/G- RFB 01 / Pick-up for A. Improved Agricultural Single Stage - One 5 provinces, MAF and MOIC IDA / 62050 Post Request for Bids Limited 630,000.00 628,400.00 Signed 2018-12-03 2019-01-11 2018-12-08 2019-01-11 2019-01-19 2019-02-08 2019-02-18 2019-02-08 2019-03-25 2019-03-11 2019-09-21 Efficiency and Sustainability Envelope (14 units) C3/G001 / Accounting software for the project Request for Single Stage - One IDA / 62050 C. Project Management Post Limited 25,000.00 24,200.00 Signed 2017-07-29 2017-12-18 2017-09-23 2018-01-31 2018-03-22 preparation and project Quotations Envelope implementation periods. C3/G002 / Computers for each project implementation Request for Single Stage - One unit involve in the PPA and IDA / V0940 C. Project Management Post Limited 30,000.00 27,168.00 Signed 2017-07-29 2017-11-01 2017-09-23 2017-12-06 2018-03-22 Quotations Envelope project implementation stages. MAF/G-RFQ 02 / Machine A. Improved Agricultural Request for Single Stage - One and equipment for NAFRI- IDA / 62050 Post Limited 25,000.00 41,327.00 Signed 2018-12-08 2019-11-26 2019-02-02 2020-01-22 2019-08-01 Efficiency and Sustainability Quotations Envelope HRC MAF/G-RFQ 10 / Lab A. Improved Agricultural Request for Single Stage - One Equipment and Tractor for IDA / 62050 Post Limited 70,000.00 55,597.00 Signed 2019-02-09 2019-04-29 2019-04-05 2019-06-25 2019-10-02 Efficiency and Sustainability Quotations Envelope NAFRI MAF/G- RFQ11 / Notebooks of 20 sets and Cellphone with Request for Single Stage - One IDA / 62050 C. Project Management Post Open - National 32,000.00 32,000.00 Signed 2019-07-06 2019-08-31 2020-08-03 2020-02-27 4-5G of 20sets Quotations Envelope (NPMO,PPMO,Districts) MAF/G- RFQ 12 / Additional Request for Single Stage - One IDA / 62050 C. Project Management Post Open - National 35,000.00 28,853.00 Signed 2019-07-06 2019-08-31 2020-09-14 2020-02-27 Equipment for DALAM Quotations Envelope MAF/G-RFQ 01 / Machine A. Improved Agricultural Request for Single Stage - One IDA / 62050 Post Limited 26,000.00 41,327.00 Signed 2019-11-20 2019-11-26 2020-01-15 2020-01-22 2020-07-13 and equipment for NAFRI-ARC Efficiency and Sustainability Quotations Envelope MAF/G-RFQ-13 / Office Request for Single Stage - One IDA / 62050 C. Project Management Post Limited 7,000.00 4,607.12 Signed 2019-12-06 2019-11-21 2020-01-31 2020-01-21 2020-07-29 Extension/Renovation Quotations Envelope MAF/G-RFQ-14 / Lab Request for Single Stage - One Equipment for PAFO & DAFO IDA / 62050 C. Project Management Post Limited 92,000.00 101,388.16 Signed 2020-01-06 2020-05-11 2020-03-02 2020-07-10 2020-08-29 Quotations Envelope of 5 Provinces MAF/G-RFQ 15 / Office Request for Single Stage - One Equipment for PAFO, DAFO, IDA / 62050 C. Project Management Post Open - National 94,100.00 68,260.50 Signed 2020-07-06 2020-08-31 2020-08-03 2021-02-27 Quotations Envelope PICO & DICO NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MAF/QBS-01 / TA for AB Matching Grants Management B. Enhanced Agricultural Quality Based IDA / 62050 Post Open - National 600,000.00 654,548.22 Signed 2018-12-15 2018-10-02 2019-01-05 2019-02-18 2019-03-13 2019-03-18 2019-04-30 2019-04-17 2019-05-23 2019-05-17 2019-08-30 2019-06-21 2019-10-25 2020-06-20 and Capacity Building for rice Commercialization Selection mills Consultant MAF/CQS-04 / Project Audits IDA / 62050 C. Project Management Post Qualification Limited 180,000.00 177,100.00 Signed 2018-12-03 2018-09-26 2018-12-17 2018-11-23 2019-01-16 2019-03-25 2019-02-20 2019-05-06 2019-08-19 for NPMO Selection Consultant MAF/CQS-02 / Panel of IDA / 62050 C. Project Management Post Qualification Limited 100,000.00 0.00 Canceled 2019-02-01 2019-09-05 2019-02-15 2019-03-17 2019-04-21 2019-10-18 Expert – Dam Safety Selection MAF/CQS-03 / TA firm for Consultant baseline, mid-term and final IDA / 62050 C. Project Management Post Qualification Limited 180,000.00 97,262.00 Signed 2019-02-01 2019-02-08 2019-02-15 2019-03-25 2019-03-17 2020-06-10 2019-04-21 2020-06-16 2019-10-18 assessment Selection Consultant MAF/CQS-05 / M&E Software IDA / 62050 C. Project Management Post Qualification Open - National 32,000.00 0.00 Canceled 2020-07-01 2020-07-17 2020-07-22 2020-09-04 2020-10-04 2020-11-08 2021-05-07 Selection MAF/LCS-01 / Mid Term Least Cost IDA / 62050 C. Project Management Post Open - National 100,000.00 0.00 Canceled 2021-08-01 2021-08-22 2021-10-05 2021-11-02 2021-12-02 2022-01-06 2022-02-10 2022-08-09 Review Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1/C001 / Senior Technical Individual Advisor (International) IDA / V0940 C. Project Management Post Consultant Open 25,000.00 39,930.00 Signed 2017-07-19 2017-07-24 2017-09-06 2017-07-24 2017-09-27 2017-11-13 2017-11-01 2017-11-13 2018-04-30 working with DPC in Lao PDR. Selection Individual C3/C001 / Procurement staff IDA / V0940 C. Project Management Post Consultant Open 8,000.00 32,400.00 Signed 2017-07-19 2017-07-24 2017-09-06 2017-08-29 2017-09-27 2017-08-29 2017-11-01 2017-10-01 2018-04-30 working in DPC Selection C3/C003 / Environmental Individual Safeguard Specialist working IDA / V0940 C. Project Management Post Consultant Open 12,000.00 14,250.00 Signed 2017-07-19 2017-08-07 2017-09-06 2017-08-29 2017-09-27 2017-10-05 2017-11-01 2017-10-09 2018-04-30 with DPC. Selection Page 2 Individual C3/C004 / Social Safeguard IDA / V0940 C. Project Management Post Consultant Open 12,000.00 8,360.00 Signed 2017-07-19 2017-08-01 2017-09-06 2017-08-29 2017-09-27 2017-10-05 2017-11-01 2017-10-09 2018-04-30 Specialist working with DPC Selection XYL /IC-01 / Technical Individual A. Improved Agricultural consultant for XBL PAFO in IDA / 62050 Post Consultant Open 120,000.00 31,200.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-19 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection Individual KM/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 15,000.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-08-23 2018-11-14 2018-09-24 2019-05-13 accountant for KM PAFO Efficiency and Sustainability Selection Individual BLK/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 10,800.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-08-21 2018-11-14 2018-09-24 2019-05-13 accountant for BLK PAFO Efficiency and Sustainability Selection Individual VC/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 20,400.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-09-05 2018-11-14 2018-09-24 2019-05-13 accountant for VC PAFO Efficiency and Sustainability Selection Individual VP/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 18,000.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-09-04 2018-11-14 2018-09-24 2019-05-13 accountant for VP PAFO Efficiency and Sustainability Selection Individual XYL/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 13,200.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-08-23 2018-11-14 2018-09-24 2019-05-13 accountant for XYL PAFO Efficiency and Sustainability Selection Individual MAF/IC-14 / Monitoring and IDA / 62050 C. Project Management Post Consultant Open 132,000.00 35,000.00 Signed 2018-08-01 2018-05-31 2018-09-19 2018-05-31 2018-10-10 2018-09-17 2018-11-14 2018-10-09 2019-05-13 evaluation specialist (DoPF) Selection Individual MAF/IC-08 / Accountant- IDA / 62050 C. Project Management Post Consultant Open 66,000.00 18,000.00 Signed 2018-08-01 2018-01-05 2018-09-19 2018-01-04 2018-10-10 2018-06-12 2018-11-14 2018-06-29 2019-05-13 assistant Selection Individual MAF/IC-11 / Procurement IDA / 62050 C. Project Management Post Consultant Open 66,000.00 18,000.00 Signed 2018-08-01 2018-05-31 2018-09-19 2018-06-04 2018-10-10 2018-09-03 2018-11-14 2018-09-03 2019-05-13 assistant Selection KM/IC-01 / Technical Individual A. Improved Agricultural consultant for KM PAFO in IDA / 62050 Post Consultant Open 120,000.00 33,600.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-10 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection VP/IC-01 / Technical Individual A. Improved Agricultural consultant for VP PAFO in IDA / 62050 Post Consultant Open 120,000.00 31,200.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-14 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection VC/IC 01 / Technical Individual A. Improved Agricultural consultant for VC PAFO in IDA / 62050 Post Consultant Open 120,000.00 33,600.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-14 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection BLK/IC-01 / Technical Individual A. Improved Agricultural consultant for BLK PAFO in IDA / 62050 Post Consultant Open 120,000.00 33,600.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-11 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection C1/C002 / Technical Advisor Individual (Lao National) working with IDA / V0940 Post Consultant Open 8,000.00 0.00 Canceled 2017-07-19 2017-09-06 2017-09-27 2017-11-01 2018-04-30 DPC. Selection MAF/IC-1 / Local Consultant Individual on Survey-Design of irrigation IDA / 62050 C. Project Management Post Consultant Open 144,000.00 44,800.00 Signed 2018-08-01 2018-05-31 2018-09-19 2018-05-31 2018-10-10 2018-10-04 2018-11-14 2018-10-10 2019-05-13 system (DOI) Selection Individual MAF/IC-4 / National Project IDA / 62050 C. Project Management Post Consultant Open 198,000.00 42,000.00 Signed 2018-09-03 2018-05-31 2018-10-22 2018-06-13 2018-11-12 2018-09-25 2018-12-17 2018-10-15 2019-06-15 Advisor (DoPF) Selection Individual MAF/IC-07 / Accountant- IDA / 62050 C. Project Management Post Consultant Open 66,000.00 18,000.00 Signed 2018-09-03 2018-01-04 2018-10-22 2018-06-28 2018-11-12 2018-06-28 2018-12-17 2018-07-13 2019-06-15 assistant Selection Individual MAF/IC-09 / Cashier – IDA / 62050 C. Project Management Post Consultant Limited 66,000.00 9,600.00 Signed 2018-09-01 2018-04-05 2018-09-06 2018-04-06 2018-09-27 2018-04-23 2018-11-01 2018-04-26 2019-04-30 assistant Selection MAF/SSS-06 / Procurement IDA / 62050 C. Project Management Post Direct Selection Direct 120,000.00 38,400.00 Signed 2018-10-01 2018-08-13 2018-10-11 2018-08-14 2018-12-15 2018-09-03 2019-06-13 specialist (DoPF) MAF/SSS-05 / Finance management specialist* IDA / 62050 C. Project Management Post Direct Selection Direct 132,000.00 26,195.00 Signed 2018-12-03 2018-10-24 2018-12-13 2018-10-29 2019-02-16 2018-11-19 2019-08-15 (DoPF) MAF/SSS-03 / Social IDA / 62050 C. Project Management Post Direct Selection Direct 84,000.00 19,000.00 Signed 2018-09-01 2018-08-14 2018-09-11 2018-08-15 2018-11-15 2018-08-27 2019-05-14 safeguard specialist (DoPF) MAF/IC-05 / International Individual Project Advisor (Project IDA / 62050 C. Project Management Post Consultant Limited 225,000.00 0.00 Canceled 2018-10-01 2018-10-06 2018-10-27 2018-12-01 2019-05-30 management DoPF) Selection MAF/SSS-07 / International IDA / 62050 C. Project Management Post Direct Selection Direct 225,000.00 62,000.00 Signed 2018-11-01 2018-10-12 2018-11-11 2018-11-22 2019-01-15 2019-01-17 2019-07-14 Project Advisor for NPMO Individual MAF/IC-010 / Administrative IDA / 62050 C. Project Management Post Consultant Limited 90,000.00 19,500.00 Signed 2018-11-01 2018-10-12 2018-11-06 2018-10-29 2018-11-27 2018-11-30 2019-01-01 2018-11-30 2019-06-30 & Public Relations Officer Selection MAF/IC-15 / 2nd Individual Procurement Assistant for IDA / 62050 C. Project Management Post Consultant Limited 36,000.00 0.00 Canceled 2018-11-01 2018-10-12 2018-11-06 2018-10-29 2018-11-27 2018-11-30 2019-01-01 2019-06-30 NPMO Selection Individual MAF/IC-012 / Project Advisor IDA / 62050 C. Project Management Post Consultant Limited 72,000.00 12,727.20 Signed 2018-11-01 2018-10-12 2018-11-06 2018-10-29 2018-11-27 2018-11-30 2019-01-01 2018-12-05 2019-06-30 (part time) for MOIC DOPC Selection Page 3 Individual MAF/IC-13 / Administrative IDA / 62050 C. Project Management Post Consultant Limited 46,000.00 7,200.00 Signed 2018-11-01 2018-10-12 2018-11-06 2018-10-29 2018-11-27 2018-12-26 2019-01-01 2018-12-24 2019-06-30 staff for MOIC DOPC Selection Individual KM/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 24,000.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to KM PICO Selection Individual BLK/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 21,600.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to BLK PICO Selection Individual VC/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 24,000.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to VC PICO Selection Individual VP/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 21,000.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to VP PICO Selection Individual XYL/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 25,200.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to XYL PICO Selection MAF/IC-02 / Local Individual Consultant on strengthening IDA / 62050 C. Project Management Post Consultant Limited 180,000.00 31,900.00 Signed 2019-01-07 2018-10-12 2019-01-12 2018-10-29 2019-02-02 2018-12-03 2019-03-09 2019-01-28 2019-09-05 of WUA and O&M (DOI) Selection Individual MAF/IC-16 / National Project IDA / 62050 C. Project Management Post Consultant Limited 198,000.00 36,000.00 Signed 2019-02-04 2019-02-05 2019-02-09 2019-02-11 2019-03-02 2019-07-02 2019-04-06 2019-07-02 2019-10-03 Advisor (NPMO) Selection MAF/SSS-08 / International Individual Procurement Advisor for IDA / 62050 C. Project Management Post Consultant Direct 51,000.00 29,480.00 Signed 2019-02-04 2019-02-11 2019-02-14 2019-02-11 2019-03-07 2019-02-11 2019-04-11 2019-02-28 2019-10-08 NPMO Selection MAF/IC-18 / National Individual Consultant on Institutional IDA / 62050 C. Project Management Post Consultant Open 130,500.00 31,200.00 Signed 2019-06-01 2019-06-05 2019-07-20 2019-08-06 2019-08-10 2019-08-12 2019-09-14 2019-08-12 2020-03-12 and Gender for MAF Selection MAF/IC-19 / National Individual Consultant on Seed, GAP and IDA / 62050 C. Project Management Post Consultant Open 130,500.00 36,000.00 Signed 2019-06-01 2019-06-05 2019-07-20 2019-06-10 2019-08-10 2019-08-14 2019-09-14 2019-08-14 2020-03-12 Organic Production and Selection Certification for MAF MAF/IC-20 / National Individual Consultant on Rice Import- IDA / 62050 C. Project Management Post Consultant Open 24,000.00 21,120.00 Signed 2019-06-01 2019-07-02 2019-07-20 2019-09-03 2019-08-10 2019-11-06 2019-09-14 2019-11-26 2020-03-12 Export Legislation and Selection Strategy to DIMAX for MoIC MAF/SSS-001 / Technical assistance to support IDA / 62050 C. Project Management Post Direct Selection Direct 485,000.00 695,955.00 Signed 2019-06-01 2019-05-22 2019-06-11 2019-06-03 2019-08-15 2020-01-08 2020-02-11 implementation (1) MAF/SSS-01 / Technical assistance to support IDA / 62050 C. Project Management Post Direct Selection Direct 770,000.00 0.00 Canceled 2018-12-03 2018-09-13 2018-12-13 2018-10-10 2019-02-16 2019-08-15 implementation (1) MAF/IC-22 / National Individual Consultant on Seed, GAP and IDA / 62050 C. Project Management Post Consultant Open 121,500.00 18,000.00 Signed 2020-01-01 2019-06-05 2020-02-19 2019-12-09 2020-03-11 2020-02-17 2020-04-15 2020-02-21 2020-10-12 Organic Production and Selection Certification for MAF Individual MAF/IC-23 / International IDA / 62050 C. Project Management Post Consultant Open 163,000.00 94,840.00 Signed 2020-01-01 2019-11-01 2020-02-19 2019-11-05 2020-03-11 2019-12-25 2020-04-15 2020-02-10 2020-10-12 Project Advisor for NPMO Selection MAF/IC-24 / National Individual Consultant on Business IDA / 62050 C. Project Management Post Consultant Limited 26,400.00 41,184.00 Signed 2020-03-01 2019-12-05 2020-03-06 2020-01-27 2020-03-27 2020-02-17 2020-05-01 2020-02-21 2020-10-28 Planning Advisor Selection MAF/IC-25 / National Consultant on Strengthening Individual of Water User Association IDA / 62050 C. Project Management Post Consultant Limited 151,000.00 19,800.00 Signed 2020-03-01 2019-12-13 2020-03-06 2020-01-15 2020-03-27 2020-01-21 2020-05-01 2020-02-21 2020-10-28 (WUAs) and Operation and Selection Maintenance (O&M) Individual KM/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 3,971.16 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-23 2021-01-11 Agronomist for KM PAFO Selection Individual BLK/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 3,968.64 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-22 2021-01-11 Agronomist for BLK PAFO Selection Individual VP/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 17,858.88 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-22 2021-01-11 Agronomist for VP PAFO Selection Individual XYL/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 15,477.70 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-22 2021-01-11 Agronomist for XYL PAFO Selection Individual VC/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 11,913.48 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-27 2021-01-11 Agronomist for VC PAFO Selection VC/IC-06 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 63,000.00 0.00 Canceled 2020-04-01 2020-05-20 2020-06-10 2020-07-15 2021-01-11 Investment Plan Development Efficiency and Sustainability Selection for VC PAFO KM/IC-06 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 59,000.00 0.00 Canceled 2020-04-01 2020-05-20 2020-06-10 2020-07-15 2021-01-11 Investment Plan Development Efficiency and Sustainability Selection for KM PAFO Page 4 MAF/IC-21 / National Individual Consultant to develop Market IDA / 62050 C. Project Management Post Consultant Limited 45,000.00 0.00 Canceled 2019-08-01 2019-12-19 2019-08-06 2020-01-08 2019-08-27 2019-10-01 2020-03-29 Information System (MIS) for Selection DIMEX, MoIC KM/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 29,500.00 29,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-04-06 2020-10-10 2020-06-22 2020-11-14 2020-06-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for KM PAFO KM/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 29,500.00 29,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-08-10 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for KM PAFO BLK/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 25,500.00 25,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-04-06 2020-10-10 2020-06-22 2020-11-14 2020-06-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for BLK PAFO BLK/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 25,500.00 25,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-08-10 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for BLK PAFO VC/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 31,500.00 31,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-04-06 2020-10-10 2020-06-22 2020-11-14 2020-06-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for VC PAFO VC/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 31,500.00 31,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-08-10 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for VC PAFO VP/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 25,000.00 25,000.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-07-13 2020-10-10 2020-06-22 2020-11-14 2020-06-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for VP PAFO VP/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 25,000.00 25,000.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-08-10 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for VP PAFO XYL/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 92,500.00 0.00 Canceled 2020-08-01 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 92,500.00 0.00 Canceled 2020-08-01 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO KM/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 12,000.00 10,500.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection KM PAFO KM/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 9,000.00 10,500.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection KM PAFO BLK/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 6,000.00 4,500.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection BLK PAFO BLK/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 3,000.00 4,500.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection BLK PAFO VC/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 12,000.00 12,000.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection VC PAFO VC/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 12,000.00 12,000.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection VC PAFO VP/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 12,000.00 10,500.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection VP PAFO VP/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 9,000.00 10,500.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection VP PAFO XYL/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 6,000.00 6,000.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection XYL PAFO XYL/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural IDA / 62050 Post Consultant Open 6,000.00 6,000.00 Signed 2020-08-01 2020-05-28 2020-09-19 2020-07-13 2020-10-10 2021-03-25 2020-11-14 2021-03-31 2021-05-13 Developing Business Plans for Commercialization Selection XYL PAFO KM/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-20 2021-05-13 Efficiency and Sustainability Facilitator for KM PAFO Selection Page 5 KM/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-20 2021-05-13 Efficiency and Sustainability Facilitator for KM PAFO Selection KM/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-20 2021-05-13 Efficiency and Sustainability Facilitator for KM PAFO Selection BLK/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for BLK PAFO Selection BLK/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for BLK PAFO Selection BLK/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for BLK PAFO Selection VC/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-21 2021-05-13 Efficiency and Sustainability Facilitator for VC PAFO Selection VC/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,841.92 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-02-12 2021-05-13 Efficiency and Sustainability Facilitator for VC PAFO Selection VC/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-21 2021-05-13 Efficiency and Sustainability Facilitator for VC PAFO Selection VP/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for VP PAFO Selection VP/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for VP PAFO Selection VP/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for VP PAFO Selection XYL/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.04 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.05 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.06 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.07 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.08 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 0.00 Canceled 2020-08-01 2020-08-05 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.09 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 0.00 Canceled 2020-08-01 2020-08-05 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.10 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 0.00 Canceled 2020-08-01 2020-08-05 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection MAF/IC-021 / International Individual Consultant on develop Market IDA / 62050 C. Project Management Post Consultant Open 60,000.00 54,692.00 Signed 2020-07-01 2019-12-19 2020-08-19 2020-01-08 2020-09-09 2020-05-26 2020-10-14 2020-06-05 2021-04-12 Information System (MIS) for Selection DIMEX MoIC Individual MAF/IC-28 / National Project IDA / 62050 C. Project Management Post Consultant Open 153,000.00 17,824.80 Signed 2020-08-01 2019-01-11 2020-09-19 2021-01-26 2020-10-10 2021-03-10 2020-11-14 2021-03-29 2021-05-13 Advisor (NPMO) Selection MAF/IC-27 / National Individual Consultant on Seed, GAP and IDA / 62050 C. Project Management Post Consultant Open 114,000.00 20,538.84 Signed 2020-08-01 2020-05-13 2020-09-19 2020-07-21 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Organic Production and Selection Certification for MAF Individual MAF/IC-29 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 78,000.00 0.00 Canceled 2020-10-01 2020-08-14 2020-11-19 2020-12-10 2021-01-14 2021-07-13 Design Engineer Efficiency and Sustainability Selection MAF/IC-30 / International Individual A. Improved Agricultural Consultant of Irrigation IDA / 62050 Post Consultant Open 42,900.00 0.00 Canceled 2020-10-01 2020-08-14 2020-11-19 2020-12-10 2021-01-14 2021-07-13 Efficiency and Sustainability Design Selection Page 6 XYL/IC- 06.1 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 37,000.00 37,000.00 Signed 2020-11-01 2020-03-03 2020-12-20 2020-04-06 2021-01-10 2020-09-25 2021-02-14 2020-10-30 2021-08-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC- 06.2 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 37,000.00 37,000.00 Signed 2020-11-01 2020-03-03 2020-12-20 2020-04-06 2021-01-10 2020-09-25 2021-02-14 2020-10-30 2021-08-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC- 06.3 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 37,000.00 37,000.00 Signed 2020-11-01 2020-03-03 2020-12-20 2020-10-10 2021-01-10 2020-11-25 2021-02-14 2020-11-26 2021-08-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC- 06.4 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 37,000.00 37,000.00 Signed 2020-11-01 2020-03-03 2020-12-20 2020-10-10 2021-01-10 2020-11-26 2021-02-14 2020-11-26 2021-08-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC- 06.5 / Local service Individual providers – Farmer Group A. Improved Agricultural Pending IDA / 62050 Post Consultant Open 37,000.00 0.00 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Investment Plan Development Efficiency and Sustainability Implementation Selection for XYL PAFO KM/IC-9 / Technical Individual consultant for KM PAFO in IDA / 62050 C. Project Management Post Consultant Open 52,800.00 20,664.96 Signed 2020-11-01 2018-07-22 2020-12-20 2020-10-05 2021-01-10 2020-12-01 2021-02-14 2020-11-30 2021-08-13 extension services Selection VC/IC-9 / Technical Individual consultant for VC PAFO in IDA / 62050 C. Project Management Post Consultant Open 57,600.00 30,000.00 Signed 2020-11-01 2018-07-22 2020-12-20 2020-10-05 2021-01-10 2020-11-23 2021-02-14 2020-11-30 2021-08-13 extension services Selection Individual KM/IC- 10 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for KM PAFO Efficiency and Sustainability Selection Individual BLK/IC- 09 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for BLK PAFO Efficiency and Sustainability Selection Individual VC/IC- 10 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for VC PAFO Efficiency and Sustainability Selection Individual VP/IC- 09 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for VP PAFO Efficiency and Sustainability Selection Individual XYL/IC- 09 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for XYL PAFO Efficiency and Sustainability Selection Individual MAF/IC-31 / Monitoring and IDA / 62050 C. Project Management Post Consultant Open 67,000.00 15,317.28 Signed 2021-04-01 2021-01-01 2021-05-20 2020-11-24 2021-06-10 2021-02-25 2021-07-15 2021-03-09 2022-01-11 Evaluation Specialist Selection Individual VP/IC-10 / Technical Under IDA / 62050 C. Project Management Post Consultant Open 99,000.00 0.00 2021-05-01 2021-05-28 2021-06-19 2021-07-10 2021-08-14 2022-02-10 assistance to VP PICO Implementation Selection Individual VC/IC-11 / Technical Under IDA / 62050 C. Project Management Post Consultant Open 96,000.00 0.00 2021-05-01 2021-05-28 2021-06-19 2021-07-10 2021-08-14 2022-02-10 assistance to VC PICO Implementation Selection Individual MAF/IC-32 / Monitoring and Under IDA / 62050 C. Project Management Post Consultant Open 67,000.00 0.00 2021-06-01 2021-06-10 2021-07-20 2021-08-10 2021-09-14 2022-03-13 Evaluation specialist Implementation Selection MAF/DS-01 / Monitoring IDA / 62050 C. Project Management Post Direct Selection Direct 25,000.00 0.00 Under Review 2021-07-01 2021-06-10 2021-07-11 2021-09-14 2022-03-13 Geotagging Website MAF/IC-33 / Provincial Individual A. Improved Agricultural Irrigation Survey and Design IDA / 62050 Post Consultant Open 72,000.00 0.00 Under Review 2021-07-01 2021-06-10 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Efficiency and Sustainability Engineer for VC & VP Selection MAF/IC-34 / Provincial Individual A. Improved Agricultural Irrigation Survey and Design IDA / 62050 Post Consultant Open 36,000.00 0.00 Under Review 2021-07-01 2021-06-10 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Efficiency and Sustainability Engineer for XYL Province Selection MAF/IC-35 / Provincial Individual A. Improved Agricultural Irrigation Survey and Design IDA / 62050 Post Consultant Open 42,000.00 0.00 Under Review 2021-07-01 2021-06-10 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Efficiency and Sustainability Engineer for BOL Province Selection MAF/IC-36 / Provincial Individual A. Improved Agricultural Irrigation Survey and Design IDA / 62050 Post Consultant Open 48,000.00 0.00 Under Review 2021-07-01 2021-06-10 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Efficiency and Sustainability Engineer for KHM Province Selection Individual MAF/IC-37 / Environment & IDA / 62050 C. Project Management Post Consultant Open 32,000.00 0.00 Under Review 2021-07-01 2021-06-10 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Social Safeguard Specialist Selection Individual MAF/IC-38 / Regional A. Improved Agricultural IDA / 62050 Post Consultant Open 92,400.00 0.00 Under Review 2021-07-01 2021-06-10 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Irrigation Expert Efficiency and Sustainability Selection Page 7 PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, Capacity Development Support to the AUC and Other AU Regional Organs, P126848 Project Implementation agency: The African Union Commission Date of the Procurement Plan: March 14, 2018 Period covered by this Procurement Plan: March 14, 2019 to March 14, 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Not Applicable Not Applicable When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Goods: Not Applicable Works: Not Applicable PROCUREMENT Eastern Africa : Support for Capacity Dev't of the AUC and other African Union Organs PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2019-03-14 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P126848 GPN Date: Project Name: Support for Capacity Dev't of the AUC and other African Union Organs Loan / Credit No: IDA / H9390, IDA / D3550 Africa Union Commission Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-AUC-81935-GO-RFB / Pending i. Strengthening Single Stage - One Supply and Installation IDA / H9390 Post Request for Bids Open - International 250,000.00 0.00 Implementati 2018-09-05 2018-09-10 2018-10-22 2018-11-21 2018-12-26 2019-06-24 Institutional Capacity Envelope Networking Equipment in AU on ET-AUC-115819-GO-RFB / Upgrading of the AUC and Reginal Office (RO) network Pending for high availability i. Strengthening Single Stage - One IDA / D3550 Post Request for Bids Open - International 300,000.00 0.00 Implementati 2019-05-31 2019-06-05 2019-07-17 2019-08-16 2019-09-20 2020-03-18 infrastructure by deployment Institutional Capacity Envelope on of Identity service Engine (ISE), Steal watch and network extension ET-AUC-175163-GO-RFB / Pending Purchase of AUCC access i. Strengthening Single Stage - One IDA / D3550 Post Request for Bids Open - International 250,000.00 0.00 Implementati 2020-07-19 2020-07-24 2020-08-21 2020-09-11 2020-10-09 2021-01-07 switches + Regional offices Institutional Capacity Envelope on Firewall ET-AUC-175168-GO-RFB / Pending Purchase and installation of i. Strengthening Single Stage - One IDA / D3550 Post Request for Bids Open - International 350,000.00 0.00 Implementati 2020-07-09 2020-07-14 2020-08-11 2020-09-01 2020-09-22 2020-12-21 equipment and IT telephony & Institutional Capacity Envelope on telecom systems ET-AUC-109689-GO-RFB / Selection of System Integrator for Design, Development, i. Strengthening Single Stage - One IDA / D3550 Post Request for Bids Open - International 1,500,000.00 0.00 Canceled 2019-07-24 2019-07-29 2019-09-09 2019-10-09 2019-11-13 2021-12-12 Implementation and Institutional Capacity Envelope Maintenance of e-Sourcing Software for the African Union ET-AUC-175170-GO-RFB / Implementation of e- i. Strengthening Single Stage - One IDA / D3550 Post Request for Bids Open - International 400,000.00 0.00 Canceled 2020-09-06 2020-09-11 2020-10-11 2020-11-10 2020-12-08 2021-05-17 Procurement system using Institutional Capacity Envelope SAAS model ET-AUC-175216-GO-RFB / Procurement of data infrastructure systems for the ii. Facilitating Economic Pending digitization of civil records Single Stage - One IDA / D3550 Development Results with Post Request for Bids Open - International 120,000.00 0.00 Implementati 2020-09-20 2020-09-25 2020-09-28 2020-10-19 2020-11-10 2021-02-08 and registries and Envelope Stakeholders on Maintenance Services at national and sub-national levels. ET-AUC-179315-GO-RFB / Pending i. Strengthening Single Stage - One Supply and delivery of IT IDA / D3550 Post Request for Bids Open - International 760,000.00 0.00 Implementati 2020-07-09 2020-07-14 2020-08-25 2020-09-24 2020-10-29 2021-04-27 Institutional Capacity Envelope Equipment on ET-AUC-179363-GO-DIR / Pending Renewal of the EMAIL and i. Strengthening IDA / D3550 Post Direct Selection Direct 340,000.00 0.00 Implementati 2020-07-16 2020-07-21 2020-08-25 2020-09-24 CLOUD services - Microsoft Institutional Capacity on Licenses ET-AUC-179500-GO-RFQ / Pending Purchase of e-Learning i. Strengthening Request for Single Stage - One IDA / D3550 Post Limited 12,000.00 0.00 Implementati 2020-08-07 2020-10-02 2021-03-31 Animation Software Institutional Capacity Quotations Envelope on (Subscription) ET-AUC-175194-NC-RFQ / Procurement of software and Pending i. Strengthening Request for Single Stage - One templates for the re- IDA / D3550 Post Limited 50,000.00 0.00 Implementati 2021-01-18 2021-03-15 2021-04-14 Institutional Capacity Quotations Envelope engineering process of e- on NEPAD Platform ET-AUC-181481-GO-RFB / Pending Purchase of data center i. Strengthening Single Stage - One IDA / D3550 Post Request for Bids Open - International 300,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-09-05 2020-10-05 2020-11-09 2021-02-07 storage and compute Institutional Capacity Envelope on equipment ET-AUC-181487-GO-RFB / Pending Purchase of Datacenter i. Strengthening Single Stage - One IDA / D3550 Post Request for Bids Open - International 200,000.00 0.00 Implementati 2020-08-04 2020-08-09 2020-09-20 2020-10-20 2020-11-24 2021-02-22 firewall and monitoring Institutional Capacity Envelope on licenses NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-AUC-175150-NC-RFQ / Under i. Strengthening Request for Single Stage - One Printing services of magazine IDA / D3550 Post Limited 15,000.00 0.00 Implementati 2020-06-19 2020-07-24 2020-07-24 2020-08-08 Institutional Capacity Quotations Envelope and brochures on Page 1 ET-AUC-175152-NC-RFQ / Pending Purchasing of Printing i. Strengthening Request for Single Stage - One IDA / D3550 Post Open - National 35,000.00 0.00 Implementati 2020-10-13 2020-12-08 2021-06-06 services of magazines and Institutional Capacity Quotations Envelope on Brochures for AU CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-AUC-78696-CS-QCBS / Update AU Digital Platforms - i. Strengthening Quality And Cost- IDA / H9390 Post Open - International 82,000.00 0.00 Canceled 2018-11-22 2018-12-13 2019-01-26 2019-02-23 2019-03-25 2019-04-29 2019-06-03 2020-06-02 Website Rebranding & Content Institutional Capacity Based Selection Update ET-AUC-81942-CS-QCBS / Consultancy services for RECs i. Strengthening Quality And Cost- IDA / H9390 Post Open - International 100,000.00 0.00 Canceled 2018-11-14 2018-12-05 2019-01-18 2019-02-15 2019-03-17 2019-04-21 2019-05-26 2020-05-25 operational model Institutional Capacity Based Selection assessment. ET-AUC-81953-CS-QCBS / Expanded Study on the ii. Facilitating Economic benefits of the Single African Quality And Cost- Under IDA / H9390 Development Results with Post Open - International 450,000.00 0.00 2018-11-09 2019-10-15 2018-11-30 2019-01-13 2019-02-10 2019-03-12 2019-04-16 2019-05-21 2020-05-20 Air Transport Market and Based Selection Implementation Stakeholders Communication Strategy for SAATM advocacy ET-AUC-118984-CS-CQS / Selection of Training Consultant i. Strengthening Pending providing firm for AU IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Institutional Capacity Implementation Emerging Leaders training for Selection AU staff. ET-AUC-118994-CS-CQS / Selection of training providing Consultant i. Strengthening Pending firm in Women in Leadership IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Institutional Capacity Implementation training program for the AU Selection staff. ET-AUC-118995-CS-CQS / Selection of training providing Consultant firm so as to provide Report i. Strengthening Pending IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Writing and Presentation Skills Institutional Capacity Implementation Selection training program for the AU staff. ET-AUC-118997-CS-CQS / Selection of training providing Consultant i. Strengthening Pending firm so as to provide Effective IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Institutional Capacity Implementation Communication Skills training Selection program for the AU staff ET-AUC-118998-CS-CQS / Selection of training providing Consultant firm so as to provide Strategic i. Strengthening Pending IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Management for Agenda 2063 Institutional Capacity Implementation Selection training program for the AU staff ET-AUC-118999-CS-CQS / Selection of training providing Consultant i. Strengthening Pending firm so as to provide IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Institutional Capacity Implementation Diplomatic Etiquette training Selection program for the AU staff. ET-AUC-119000-CS-CQS / Selection of training providing Consultant i. Strengthening Pending firm so as to provide Policy IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Institutional Capacity Implementation Research & Analysis training Selection program for the AU staff. ET-AUC-119003-CS-CQS / Selection of training providing Consultant firm so as to provide i. Strengthening Pending IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Delivering Service Excellence Institutional Capacity Implementation Selection training program for the AU staff. ET-AUC-119004-CS-CQS / Selection of training providing Consultant firm so as to provide ICT i. Strengthening Pending IDA / D3550 Post Qualification Open - International 25,000.00 0.00 2019-06-14 2019-07-05 2019-08-18 2019-09-17 2019-10-22 2020-04-19 Productivity- Microsoft Office Institutional Capacity Implementation Selection Proficiency training program for the AU staff. ET-AUC-78675-CS-QCBS / SAP Grant Management i. Strengthening Quality And Cost- IDA / D3550 Post Open - International 700,000.00 0.00 Canceled 2018-09-19 2018-10-12 2018-11-25 2018-12-23 2019-01-22 2019-02-26 2019-04-02 2019-09-29 Implementation Support for Institutional Capacity Based Selection the AU ET-AUC-175132-CS-QCBS / i. Strengthening Quality And Cost- Pending Development of the AU IDA / D3550 Post Open - International 300,000.00 0.00 2020-07-30 2020-08-05 2020-09-03 2020-10-01 2020-10-16 2020-10-30 2020-11-27 2021-02-23 Institutional Capacity Based Selection Implementation transition plan ET-AUC-175177-CS-QCBS / Consultancy service and acquisition of AUC HR records i. Strengthening Quality And Cost- Pending IDA / D3550 Post Open - International 100,000.00 0.00 2020-08-10 2020-08-25 2020-09-16 2020-10-14 2020-10-29 2020-12-03 2021-01-07 2021-04-05 and archives management Institutional Capacity Based Selection Implementation system to digitize employees’ records. ET-AUC-175197-CS-QCBS / Consultancy service for support of process review and i. Strengthening Quality And Cost- Under re-engineering, solution IDA / D3550 Post Open - International 200,000.00 0.00 2020-09-13 2020-06-23 2020-09-28 2020-10-27 2020-11-24 2020-12-09 2021-01-07 2021-01-28 2021-05-28 Institutional Capacity Based Selection Implementation proposal and change management in view of e- NEPAD formation. Page 2 ET-AUC-175201-CS-QCBS / Consultancy service for deployment and training of i. Strengthening Quality And Cost- Pending IDA / D3550 Post Open - International 400,000.00 0.00 2020-08-09 2020-08-16 2020-09-14 2020-10-12 2020-11-02 2020-11-23 2020-12-15 2021-05-14 opted solution(s) for Institutional Capacity Based Selection Implementation automation and digital workplace. ET-AUC-175214-CS-QCBS / Consultancy Services to undertake development, ii. Facilitating Economic Quality And Cost- Under deployment and maintenance IDA / D3550 Development Results with Post Open - International 200,000.00 0.00 2020-08-23 2020-08-24 2020-09-07 2020-09-29 2020-10-27 2020-11-17 2020-12-12 2021-01-03 2021-06-02 Based Selection Implementation of data tools and technologies Stakeholders for the AU Innovation Data Hub. ET-AUC-175203-CS-QCBS / Consultancy service on reconfiguration and i. Strengthening Quality And Cost- Pending IDA / D3550 Post Open - International 100,000.00 0.00 2020-08-16 2020-08-17 2020-09-15 2020-10-13 2020-10-28 2020-11-25 2020-12-17 2021-05-16 consolidation of AUDA-NEPAD Institutional Capacity Based Selection Implementation SAP ERP System to align with e- NEPAD ET-AUC-178370-CS-QCBS / Consultancy Services to ii. Facilitating Economic develop Africa’s Partnership Quality And Cost- Under IDA / D3550 Development Results with Post Open - International 132,980.00 0.00 2020-08-16 2020-08-24 2020-09-06 2020-10-20 2020-11-17 2020-12-17 2021-01-21 2021-02-25 2021-05-26 Strategy, Map, develop Based Selection Implementation Stakeholders baseline and external partners report ET-AUC-178374-CS-QCBS / Consultancy Services on ii. Facilitating Economic Innovation of Data Hab for Quality And Cost- Under IDA / D3550 Development Results with Post Open - International 90,000.00 0.00 2020-08-28 2020-08-24 2020-09-18 2020-11-01 2020-11-29 2020-12-29 2021-02-02 2021-03-09 2021-06-07 datasets and information Based Selection Implementation Stakeholders required for generating policy insights from the hub. ET-AUC-175142-CS-QCBS / Consultancy Services for the i. Strengthening Quality And Cost- Pending IDA / D3550 Post Open - International 200,000.00 0.00 2020-07-12 2020-07-19 2020-08-17 2020-09-14 2020-09-29 2020-10-13 2020-10-27 2021-01-23 production of documentaries Institutional Capacity Based Selection Implementation for AU flagship projects ET-AUC-175164-CS-QCBS / Consultancy Services for SAP i. Strengthening Quality And Cost- Under IDA / D3550 Post Open - International 182,000.00 0.00 2020-07-05 2020-08-05 2020-07-20 2020-08-17 2020-09-14 2020-09-29 2020-10-13 2020-10-27 2021-04-05 Business Process Re- Institutional Capacity Based Selection Implementation engineering in AUS ET-AUC-184878-CS-QCBS / Implementation of e- i. Strengthening Quality And Cost- IDA / D3550 Post Open - International 400,000.00 0.00 Under Review 2020-07-31 2020-08-10 2020-08-14 2020-09-12 2020-10-10 2020-10-25 2020-11-29 2021-01-03 2021-06-02 Procurement System in AU Institutional Capacity Based Selection using SaaS model ET-AUC-188089-CS-QCBS / Establishment of expert databases, repositories, Communities of Practice and ii. Facilitating Economic Quality And Cost- Under guidelines for data collection, IDA / D3550 Development Results with Post Open - International 60,000.00 0.00 2020-08-30 2020-08-24 2020-09-20 2020-11-03 2020-12-01 2020-12-31 2021-02-04 2021-03-11 2021-05-10 Based Selection Implementation analysis, validation, reporting, Stakeholders and for mutual accountability - reinforcing the continental dashboard ET-AUC-188090-CS-QCBS / Development of a continental dashboard with an interactive map that enables tracking and ii. Facilitating Economic Quality And Cost- Under reporting on AU Member IDA / D3550 Development Results with Post Open - International 95,000.00 0.00 2020-08-30 2020-08-19 2020-09-20 2020-11-03 2020-12-01 2020-12-31 2021-02-04 2021-03-11 2021-05-10 Based Selection Implementation States' implementation Stakeholders progress and performance on Agenda 2063 and SDGs goals and targets ET-AUC-188093-CS-QCBS / Consultancy Services to acquire, customize and operationalize continental e- learning System on Software ii. Facilitating Economic Quality And Cost- Under as a Services (SaaS) model to IDA / D3550 Development Results with Post Open - International 350,000.00 0.00 2020-08-30 2020-10-02 2020-09-20 2020-11-03 2020-12-01 2020-12-31 2021-02-04 2021-03-11 2021-06-29 Based Selection Implementation disseminate Business Stakeholders Development and Management Solutions for MSMEs leaders in 55 African Member States. ET-AUC-188094-CS-QCBS / Consultancy Services to acquire, customize and operationalize e-Market Place ii. Facilitating Economic Quality And Cost- Pending module Repository of IDA / D3550 Development Results with Post Open - International 450,000.00 0.00 2020-08-30 2020-09-20 2020-11-03 2020-12-01 2020-12-31 2021-02-04 2021-03-11 2021-06-29 Based Selection Implementation marketplaces (e-commerce, Stakeholders etc.) on Software as a Services (SaaS) model for MSMEs in 55 countries in Africa ET-AUC-188098-CS-QCBS / Consultancy Services to acquire, customize and operationalize Simplified e- ii. Facilitating Economic Procurement module on Quality And Cost- Pending IDA / D3550 Development Results with Post Open - International 150,000.00 0.00 2020-08-30 2020-09-20 2020-11-03 2020-12-01 2020-12-31 2021-02-04 2021-03-11 2021-06-29 Software as a Services (SaaS) Based Selection Implementation Stakeholders model to avail public procurement opportunities to MSMEs in 55 countries in Africa ET-AUC-188100-CS-QCBS / Consultancy Service to support the designing and ii. Facilitating Economic implementation of e-learning Quality And Cost- Pending IDA / D3550 Development Results with Post Open - International 300,000.00 0.00 2020-08-23 2020-09-13 2020-10-27 2020-11-24 2020-12-24 2021-01-28 2021-03-04 2021-06-22 system, e-Market place Based Selection Implementation Stakeholders system and simplified e- Procurement platform for AUDA-NEPAD ET-AUC-227208-CS-LCS / i. Strengthening Least Cost Pending IDA / H9390 Post Open - National 10,000.00 0.00 2021-03-31 2021-04-01 2021-04-03 2021-05-01 2021-05-06 2021-05-16 2021-05-28 2021-06-27 Annual Project Financial Audit Institutional Capacity Selection Implementation Page 3 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-AUC-78689-CS-INDV / Individual Development of Finance i. Strengthening IDA / H9390 Post Consultant Open 50,000.00 0.00 Canceled 2018-11-14 2019-01-02 2019-01-23 2019-02-27 2019-08-26 Intranet (Regulatory, IPSAS Institutional Capacity Selection NEWS, forum,....) ET-AUC-78693-CS-INDV / Individual i. Strengthening Pending development of strategic IDA / H9390 Post Consultant Open 150,000.00 0.00 2018-11-29 2019-01-17 2019-02-07 2019-03-14 2019-09-10 Institutional Capacity Implementation plans of 2 AU organs Selection ET-AUC-81933-CS-INDV / Individual i. Strengthening Consultancy & development of IDA / H9390 Post Consultant Open 50,000.00 0.00 Canceled 2018-11-27 2019-01-15 2019-02-05 2019-03-12 2019-09-08 Institutional Capacity a Financial Control Framework Selection Individual ET-AUC-78679-CS-INDV / i. Strengthening IDA / D3550 Post Consultant Limited 12,000.00 0.00 Canceled 2019-05-15 2019-05-20 2019-06-10 2019-07-15 2020-01-11 Communication Consultant Institutional Capacity Selection ET-AUC-106359-CS-CDS / i. Strengthening Pending 2018 Year End Project IDA / H9390 Post Direct Selection Direct 2,400.00 0.00 2019-05-14 2019-05-24 2019-07-28 2020-01-24 Institutional Capacity Implementation Financial Audit ET-AUC-115842-CS-QCBS / Individual Selection of an individual i. Strengthening Pending IDA / D3550 Post Consultant Open 50,000.00 0.00 2019-05-21 2019-07-09 2019-07-30 2019-09-03 2020-03-01 consultant for Revamping of Institutional Capacity Implementation Selection the AUC Internet Portal Individual ET-AUC-78697-CS-INDV / i. Strengthening IDA / H9390 Post Consultant Limited 12,000.00 0.00 Canceled 2018-04-11 2018-04-16 2018-05-07 2018-06-11 2018-12-08 Media Consultant Institutional Capacity Selection ET-AUC-166560-CS-CDS / i. Strengthening Pending IDA / D3550 Post Direct Selection Direct 2,129.00 0.00 2020-03-27 2020-04-06 2020-06-10 2020-12-07 Annual Project Audit Institutional Capacity Implementation ET-AUC-175184-CS-INDV / ii. Facilitating Economic Individual Senior consultant in Trade in Under IDA / D3550 Development Results with Post Consultant Open 100,000.00 0.00 2020-09-13 2020-06-24 2020-10-20 2020-10-27 2020-11-17 2021-02-15 goods – data Implementation Stakeholders Selection analytics/economist ET-AUC-175188-CS-INDV / Development of a continental dashboard with an interactive map that enables tracking and ii. Facilitating Economic Individual reporting on AU Member IDA / D3550 Development Results with Post Consultant Open 95,000.00 0.00 Canceled 2020-08-11 2020-06-25 2020-09-29 2020-10-20 2020-11-24 2021-05-23 States' implementation Stakeholders Selection progress and performance on Agenda 2063 and SDGs goals and targets ET-AUC-175191-CS-INDV / Establishment of expert databases, repositories, Communities of Practice and ii. Facilitating Economic Individual Under guidelines for data collection, IDA / D3550 Development Results with Post Consultant Open 60,000.00 0.00 2020-09-13 2020-06-25 2020-11-01 2020-11-22 2020-12-27 2021-06-25 Implementation analysis, validation, reporting, Stakeholders Selection and for mutual accountability - reinforcing the continental dashboard. ET-AUC-175204-CS-INDV / Individual Engagement of consultant for i. Strengthening Under IDA / D3550 Post Consultant Open 65,000.00 0.00 2020-09-13 2020-06-23 2020-10-17 2020-11-01 2020-11-29 2021-04-28 project coordination and Institutional Capacity Implementation Selection assistance ET-AUC-175212-CS-INDV / Senior expert to develop ii. Facilitating Economic Individual Partnerships M & E Under IDA / D3550 Development Results with Post Consultant Open 48,020.00 0.00 2020-09-07 2020-08-24 2020-09-28 2020-10-05 2020-10-27 2020-12-26 Framework, Tracking & Implementation Stakeholders Selection Reporting Tool, Digital database ET-AUC-175213-CS-INDV / ii. Facilitating Economic Individual Under Junior Short-term Consultant IDA / D3550 Development Results with Post Consultant Open 80,000.00 0.00 2020-10-11 2020-08-24 2020-11-19 2020-12-04 2020-12-12 2021-05-11 Implementation to support TCP on project Stakeholders Selection ET-AUC-175220-CS-INDV / Consultancy Services to develop an AU-wide Citizen ii. Facilitating Economic Individual Under Engagement Strategy in line IDA / D3550 Development Results with Post Consultant Open 70,000.00 0.00 2020-09-22 2020-08-24 2020-11-10 2020-12-01 2021-01-05 2021-04-05 Implementation with standardized tools, Stakeholders Selection instruments and indicators for Agenda 2063 implementation. ET-AUC-175186-CS-INDV / Consultancy service for ii. Facilitating Economic Individual competition policy for the IDA / D3550 Development Results with Post Consultant Open 50,000.00 0.00 Under Review 2020-09-08 2020-09-23 2020-10-27 2020-11-17 2020-12-22 2021-06-20 AfCFTA support unit and Stakeholders Selection Interim secretariat. ET-AUC-175222-CS-INDV / Consultancy Services to develop a set of advisory services guidelines and ii. Facilitating Economic Individual Under knowledge products based on IDA / D3550 Development Results with Post Consultant Open 70,000.00 0.00 2020-09-13 2020-08-24 2020-11-01 2020-11-22 2020-12-27 2021-04-26 Implementation the AU-wide Citizen Stakeholders Selection Engagement Strategy (tools, capacity building and training materials) ET-AUC-175225-CS-INDV / Consultancy Services to Undertake a context analysis and stakeholder mapping of ii. Facilitating Economic Individual Under existing data use and citizens IDA / D3550 Development Results with Post Consultant Open 52,000.00 0.00 2020-09-20 2020-08-24 2020-11-08 2020-11-29 2021-01-03 2021-04-03 Implementation engagement mechanisms Stakeholders Selection across AU Organs, CSOs, private sector, communities, faith-based organizations Page 4 ET-AUC-175209-CS-INDV / Consultancy Services to Individual i. Strengthening Pending supervise and monitor the IDA / D3550 Post Consultant Open 65,000.00 0.00 2020-08-16 2020-09-24 2020-10-01 2020-10-23 2021-06-24 Institutional Capacity Implementation development of e-NEPAD Selection solutions. ET-AUC-175215-CS-INDV / Deployment of data interfacing modules and tools ii. Facilitating Economic Individual Pending in selected Member States for IDA / D3550 Development Results with Post Consultant Open 48,000.00 0.00 2020-09-20 2020-11-08 2020-11-29 2021-01-03 2021-05-03 Implementation linkage and transmission of Stakeholders Selection data to and from the AU Innovation Data hub ET-AUC-175145-CS-INDV / Consultancy Services for Individual Multimedia content i. Strengthening Under IDA / D3550 Post Consultant Open 30,000.00 0.00 2020-07-06 2020-07-10 2020-08-09 2020-08-23 2020-09-20 2021-02-17 development and video Institutional Capacity Implementation Selection documentaries on flagships projects ET-AUC-175147-CS-INDV / Individual Consultancy Services for the i. Strengthening Under IDA / D3550 Post Consultant Open 40,000.00 0.00 2020-07-12 2020-07-10 2020-08-01 2020-08-15 2020-09-05 2021-02-02 development of AU Open Institutional Capacity Implementation Selection Space Content ET-AUC-175139-CS-INDV / Develop and design L&D Strategy, processes and Individual i. Strengthening Pending policies to improve e- IDA / D3550 Post Consultant Open 70,000.00 0.00 2020-06-21 2020-08-09 2020-08-14 2020-08-28 2020-10-27 Institutional Capacity Implementation learning, web-based, and VC Selection based training modules and knowledge impact assessment ET-AUC-175146-CS-INDV / Individual Consultancy Services for i. Strengthening Under IDA / D3550 Post Consultant Open 30,000.00 0.00 2020-07-03 2020-07-10 2020-08-05 2020-08-19 2020-09-16 2021-02-13 development of contents for Institutional Capacity Implementation Selection six publications ET-AUC-175187-CS-INDV / Consultancy service to provide capacity development support ii. Facilitating Economic Individual Under to the team responsible for IDA / D3550 Development Results with Post Consultant Open 75,000.00 0.00 2020-08-02 2020-10-22 2020-08-22 2020-09-05 2020-09-26 2021-03-25 Implementation statistical strategy Stakeholders Selection implementation (Harmonization of Statistics) ET-AUC-184110-CS-CDS / SAP S4 Training by SAP Africa) i. Strengthening Under to AU Senior Management, IDA / D3550 Post Direct Selection Direct 290,000.00 0.00 2020-10-02 2020-08-05 2020-10-12 2020-12-16 2021-03-16 Institutional Capacity Implementation Business Users (FICO, HCM, MM) and SAP Technical Team ET-AUC-200078-CS-INDV / the consultancy service is used to assist the African Union in developing a partnership strategy and Individual i. Strengthening Under policy, providing guidelines to IDA / D3550 Post Consultant Open 60,000.00 0.00 2020-10-16 2020-10-16 2020-12-04 2020-12-25 2021-01-29 2021-07-28 Institutional Capacity Implementation strengthen its capacity in Selection partnership initiation, development, coordination and management, with a view of agenda 2063. ET-AUC-200085-CS-INDV / The Consultant will support the Head of PMCD and his team in developing the Individual i. Strengthening Under partnership strategy and IDA / H9390 Post Consultant Open 30,000.00 0.00 2020-10-16 2020-10-16 2020-12-04 2020-12-25 2021-01-29 2021-07-28 Institutional Capacity Implementation policy and Support the Selection development of working methods with ACBF and AUDA- NEPAD. ET-AUC-200088-CS-INDV / Consultancy service for the development of the partnerships management Individual i. Strengthening Under information system (PMIS) is IDA / D3550 Post Consultant Open 30,000.00 0.00 2020-10-16 2020-10-16 2020-12-04 2020-12-25 2021-01-29 2021-07-28 Institutional Capacity Implementation used to provide support to Selection the Partnerships Management and Coordination Division in the development of the PMIS ET-AUC-201013-CS-INDV / Consultancy service to provide capacity development support ii. Facilitating Economic Individual Pending to the team responsible for IDA / D3550 Development Results with Post Consultant Open 75,000.00 0.00 2020-10-22 2020-12-10 2020-12-31 2021-02-04 2021-08-03 Implementation statistical strategy Stakeholders Selection implementation (Harmonization of Statistics) ET-AUC-238211-CS-INDV / Selection of Communication officer to support AUC- STATAFRIC on the Individual i. Strengthening Pending management and IDA / H9390 Post Consultant Open 60,000.00 0.00 2021-06-04 2021-07-23 2021-08-13 2021-09-17 2022-03-16 Institutional Capacity Implementation implementation of the series Selection of webinars on the impact of the COVID 19 pandemic on statistical production in Africa ET-AUC-238214-CS-INDV / Selection of IT/Statistician to support AUC-STATAFRIC on Individual the management and i. Strengthening Pending IDA / H9390 Post Consultant Open 60,000.00 0.00 2021-06-04 2021-07-23 2021-08-13 2021-09-17 2022-03-16 implementation of the series Institutional Capacity Implementation Selection of webinars on the impact of the COVID 19 pandemic on statistical production in Africa Page 5 PROCUREMENT PLAN Project information: Sint Maarten Hospital Resiliency Project (P167532) Project Implementation agency: SMMC Date of the Procurement Plan: 09/14/2018 Period covered by this Procurement Plan: September 2018 to March 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is applicable for those contracts identified in the Procurement Plan tables]; Works: [is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations not Applicable. PROCUREMENT St Maarten : Sint Maarten Hospital Resiliency & Preparedness Project PLAN General Information Country: St Maarten Bank’s Approval Date of the Original Procurement Plan: 2018-10-02 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167532 GPN Date: Project Name: Sint Maarten Hospital Resiliency & Preparedness Project Loan / Credit No: TF / A8176, / SMMC Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AN-SMMC-77512-CW-RFQ / Transition and Contingency Fire detection system, Request for Single Stage - One 2019-06- TF / A8176 Plan for Sint Maarten Medical Prior Open - International 150,000.00 115,357.00 Signed 2018-11-28 2019-02-01 2019-02-21 purchases and installation of Quotations Envelope 14 Center system Transition and Contingency AN-SMMC-78173-CW-DIR / 2018-11- TF / A8176 Plan for Sint Maarten Medical Prior Direct Selection Direct 300,000.00 265,807.00 Signed 2018-09-13 2018-09-13 2018-09-13 2018-07-24 Roof reinforcement 07 Center ESSENTIAL UPGRADES DOC Transition and Contingency 2019-06- CHAPTER 10 / Fiber Optic TF / A8176 Plan for Sint Maarten Medical Prior Direct Selection Direct 500,000.00 0.00 Canceled 2019-01-08 2019-01-13 2019-03-22 21 connection to SMMC Center AN-SMMC-99835-CW-DIR / Component 1: World Bank Building and launching of the 17,000,000.0 133,309,86 2023-04- TF / A8176 Prior Direct Selection Direct Signed 2019-02-08 2019-02-08 2019-02-08 2016-09-19 Contribution to INSO contract new hospital 0 5.00 03 with SMMC ESSENTIAL UPGRADES DOC Transition and Contingency Request for Single Stage - One 2020-06- CHAPTER SIX / expansion of TF / A8176 Plan for Sint Maarten Medical Post Open - National 60,000.00 0.00 Canceled 2020-01-18 2020-03-10 Quotations Envelope 13 Dialysis department Center AN-SMMC-77679-CW-RFB / Transition and Contingency Pending Request for Single Stage - One 2020-04- Upgrading OR Complex Phase TF / A8176 Plan for Sint Maarten Medical Post Open - National 125,000.00 0.00 Implementat 2019-11-05 2020-01-11 Quotations Envelope 18 1 - Expansion Center ion AN-SMMC-77501-CW-RFQ / Transition and Contingency Request for Single Stage - One 2020-05- Medical gas distribution sytem TF / A8176 Plan for Sint Maarten Medical Post Open - International 35,000.00 492,680.00 Signed 2019-10-30 2020-01-03 2020-10-13 Quotations Envelope 15 upgrading Center ESSENTIAL UPGRADES DOC Transition and Contingency CHAPTER 5 / Construction of 2019-11- TF / A8176 Plan for Sint Maarten Medical Post Direct Selection Direct 256,500.00 0.00 Canceled 2019-06-03 2019-06-20 2019-08-29 Additional Patient rooms 28 Center MedSurg AN-SMMC-78161-CW-RFB / Transition and Contingency Construction of 5 x Double Single Stage - One 2019-05- TF / A8176 Plan for Sint Maarten Medical Post Request for Bids Open - National 731,500.00 0.00 Canceled 2018-11-09 2018-11-19 2018-12-19 2019-01-18 2019-02-15 Patient Rooms and Support Envelope 16 Center Services Building AN-SMMC-78164-CW-RFQ / Transition and Contingency Pending Request for Single Stage - One 2019-05- Upgrade OR Complex Phase 3 TF / A8176 Plan for Sint Maarten Medical Post Open - International 125,000.00 0.00 Implementat 2018-11-30 2019-02-18 Quotations Envelope 03 - Floor, ceiling, etc. Center ion AN-SMMC-135079-CW-RFQ Transition and Contingency / Construction of 5 x Double Request for Single Stage - One 1,582,304.5 2020-07- TF / A8176 Plan for Sint Maarten Medical Post Open - International 731,500.00 Signed 2019-11-10 2020-01-19 2021-01-11 Patient Rooms & Support Quotations Envelope 8 02 Center Service Building AN-SMMC-177444-CW-RFP Transition and Contingency Request for Single Stage - Two 2020-10- / Hurricane facility for Covid- TF / A8176 Plan for Sint Maarten Medical Post Limited 600,000.00 559,500.00 Signed 2020-06-02 2020-05-25 2020-06-03 2020-05-25 2020-06-04 2020-06-04 2020-06-19 2020-06-11 2020-07-04 2020-06-23 Proposals Envelope 02 19 Care Center AN-SMMC-204963-CW-RFQ Transition and Contingency Request for Single Stage - One 2021-07- / Construction for Dialysis an TF / A8176 Plan for Sint Maarten Medical Post Open - National 527,500.00 783,000.00 Signed 2020-11-23 2021-01-22 2021-02-01 Quotations Envelope 21 Oncology expansion. Center AN-SMMC-78169-CW-RFB / Transition and Contingency Single Stage - One 2020-10- Construction of Care Complex TF / A8176 Plan for Sint Maarten Medical Post Request for Bids Open - International 810,000.00 0.00 Canceled 2020-01-17 2020-01-27 2020-03-02 2020-03-19 2020-04-23 Envelope 19 Expansion Center Transition and Contingency AN-SMMC-78172-CW-RFQ / Request for Single Stage - One 2020-09- TF / A8176 Plan for Sint Maarten Medical Post Open - International 40,000.00 0.00 Canceled 2020-05-25 2020-07-27 Execution Water Control Plan Quotations Envelope 25 Center AN-SMMC-78162-CW-RFQ / Transition and Contingency Request for Single Stage - One 2020-03- Improve General Facilities - TF / A8176 Plan for Sint Maarten Medical Post Open - National 130,000.00 0.00 Canceled 2019-11-23 2020-01-27 Quotations Envelope 29 Cashier / Main Patio Upgrade Center AN-SMMC-77689-CW-RFQ / Upgrading OR Complex phase Transition and Contingency 2. Installation of HVAC Single Stage - One 2020-05- TF / A8176 Plan for Sint Maarten Medical Post Request for Bids Open - International 375,000.00 0.00 Canceled 2019-11-11 2019-11-18 2019-12-18 2020-01-01 2020-02-05 system, upgrading of the Envelope 10 Center electrical installation OR, upgrading of medical gas OR. AN-SMMC-208157-CW-DIR / Transition and Contingency Hospital MEP installation 2021-07- TF / A8176 Plan for Sint Maarten Medical Post Direct Selection Direct 800,000.00 815,000.00 Signed 2020-12-04 2020-10-30 2020-12-09 2020-11-18 2021-01-13 2021-01-11 works for double patient 12 Center rooms and new OR complex. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 AN-SMMC-98713-GO-RFQ / Supply and installation of a Transition and Contingency Request for Single Stage - One new autoclave grinder system TF / A8176 Plan for Sint Maarten Medical Post Open - International 250,000.00 0.00 Canceled 2019-03-07 2019-05-25 2019-08-03 Quotations Envelope for the treatment of our Center medical waste. AN-SMMC-78174-GO-RFQ / ICT upgrades - pro forma Transition and Contingency upload of activity - all sub Request for Single Stage - One TF / A8176 Plan for Sint Maarten Medical Post Open - International 350,000.00 299,836.00 Signed 2019-02-23 2019-04-20 2019-06-06 2020-03-23 activities will be uploaded Quotations Envelope Center separately in consultation with our ICT manager AN-SMMC-77520-GO-RFQ / Transition and Contingency Request for Single Stage - One Upgrading Access Control TF / A8176 Plan for Sint Maarten Medical Post Open - International 75,000.00 92,069.75 Signed 2019-02-17 2019-04-23 2019-04-26 2019-09-03 Quotations Envelope System Center Transition and Contingency AN-SMMC-78168-GO-RFQ / Request for Single Stage - One TF / A8176 Plan for Sint Maarten Medical Post Open - International 35,000.00 0.00 Canceled 2018-11-07 2019-01-18 2019-03-29 Generator Care Complex Quotations Envelope Center AN-SMMC-78167-GO-RFQ / Transition and Contingency Request for Single Stage - One Two Generators for SMMC - TF / A8176 Plan for Sint Maarten Medical Post Open - International 200,000.00 180,768.56 Signed 2018-11-07 2019-01-18 2019-07-19 2019-03-29 Quotations Envelope Main Building & Care Complex Center AN-SMMC-114142-GO-RFQ Transition and Contingency / Purchase of Furniture & Request for Single Stage - One TF / A8176 Plan for Sint Maarten Medical Post Open - International 250,000.00 0.00 Canceled 2019-11-20 2020-01-22 2020-04-21 Equipment for approved Quotations Envelope Center existing WB projects ESSENTIAL UPGRADES DOC Transition and Contingency Pending CHAPTER 6 / Purchase of TF / A8176 Plan for Sint Maarten Medical Post Direct Selection Direct 15,000.00 0.00 Implementati 2020-05-30 2020-06-13 2020-08-01 2020-11-04 Dialysis Equipment and Water Center on Loop AN-SMMC-114144-GO-DIR / Transition and Contingency Purchase of DELL Work TF / A8176 Plan for Sint Maarten Medical Post Direct Selection Direct 275,000.00 0.00 Canceled 2019-05-08 2019-09-23 2019-11-02 2019-11-22 Stations & Back-up Servers Center AN-SMMC-227327-GO-DIR / Justification for direct contracting for goods is based on: - Critical and urgent need Transition and Contingency Pending for medical supplies, TF / A8176 Plan for Sint Maarten Medical Post Direct Selection Direct 1,632,300.00 0.00 Implementati 2021-03-30 2021-04-04 2021-05-09 2021-11-05 equipment, and furniture, in Center on emergency response to the rapid increase of patients on island during Covid -19 Pandemic; NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AN-SMMC-114141-CS-CQS / Preparation of bidding and Transition and Contingency Consultant permit documentation for 5 TF / A8176 Plan for Sint Maarten Medical Post Qualification Open - International 37,500.00 31,395.00 Signed 2019-05-08 2019-03-27 2019-05-09 2019-05-11 2019-04-25 2019-05-27 2019-06-09 2019-06-17 2019-06-02 2019-07-17 double patient rooms in Med- Center Selection Surg ward AN-SMMC-78171-CS-CQS / Transition and Contingency Consultant Consultancy Services to TF / A8176 Plan for Sint Maarten Medical Post Qualification Open - National 10,000.00 0.00 Canceled 2019-09-16 2019-10-07 2019-11-20 2019-12-09 2019-12-30 2020-02-07 realize Water Control Plan Center Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AN-SMMC-77526-CS-INDV / Individual Hiring Project Coordinator and Under / Project Management Prior Consultant Open 300,000.00 0.00 2018-09-01 2018-10-19 2018-10-26 2018-11-09 2019-12-31 Project Assistant as Implementation Selection employees. AN-SMMC-114139-CS-CDS / Consultancy services hired for Transition and Contingency PDO # 2,5,10 - Emergency TF / A8176 Plan for Sint Maarten Medical Post Direct Selection Direct 25,000.00 22,200.00 Signed 2019-05-08 2019-02-17 2019-05-10 2019-04-07 2019-05-13 2019-04-25 2019-08-11 Disaster & Preparedness Plan Center and Contingency Plan. AN-SMMC-78166-CS-QCBS / Design firm for Additional Patient rooms and care complex expansion - preferred to do by same Transition and Contingency engineer as new hospital TF / A8176 Plan for Sint Maarten Medical Post Direct Selection Direct 118,500.00 0.00 Canceled 2018-11-30 2018-12-07 2019-01-30 2019-04-30 project for realizing mock-up Center rooms and additional space in Care Complex that can be used well in combination with new hospital. AN-SMMC-208166-CS-CDS / Transition and Contingency COVID- 19 Pandemic support Under TF / A8176 Plan for Sint Maarten Medical Post Direct Selection Direct 250,000.00 0.00 2020-12-04 2021-01-12 2020-12-04 2020-11-27 2020-12-07 2021-06-05 staff, Medical, Administrative Implementation Center and Store Room Staff Page 2 PROCUREMENT PLAN (Textual Part) Project information: Cote d’Ivoire Electricity Transmission and Access Project(P157055) Project Implementation agency: CI-ENERGIES Date of the Procurement Plan: September 7, 2017 Period covered by this Procurement Plan: September 2017- December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing is not applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is not applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable Works: is not applicable PROCUREMENT Cote d'Ivoire : Cote d'Ivoire - Electricity Transmission and Access Project PLAN General Information Country: Cote d'Ivoire Bank’s Approval Date of the Original Procurement Plan: 2017-09-25 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157055 GPN Date: 2017-08-23 Project Name: Cote d'Ivoire - Electricity Transmission and Access Project Loan / Credit No: IDA / 59990 C Executing Agency(ies): I-ENERGIES WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-CI-ENERGIES-27208-CW- RFB / Construction du poste source 225/90/33/15 kV de Gagnoa Rehabilitation, lot 1: Travaux de création du Reinforcement, and Extension Single Stage - One 13,900,000.0 15,774,796. 2019-06- poste source IDA / 59990 of Distribution Systems in Prior Request for Bids Open - International Signed 2017-09-05 2017-09-19 2017-10-06 2017-10-31 2018-01-04 2017-11-30 2018-01-19 2018-01-04 2018-02-26 Envelope 0 66 28 lot 2: Travaux de création de Abidjan and 10 Regional l'entrée en coupure des ligne Capital cities 225 et 90 kV lot 3 : Télétransmission du poste source CI-CI-ENERGIES-27217-CW- RFB / Construction des postes sources 225/90kV de Yopougon 1, Treichville et Bia Rehabilitation, Sud Reinforcement, and Extension lot 1: Poste 225kV incluant 1 Single Stage - One 43,000,000.0 35,966,613. Under 2019-08- IDA / 59990 of Distribution Systems in Prior Request for Bids Open - International 2017-09-12 2017-11-08 2017-09-21 2018-02-11 2017-11-02 2018-04-17 2017-12-03 2019-01-24 2018-01-08 2019-01-21 transfo 225/90kV 100MVA Envelope 0 45 Review 05 Abidjan and 10 Regional lot 2: Poste 225kV incluant 2 Capital cities transfo 225/90kV 100MVA lot 3: Poste 225kV incluant 2 travées transfo 225/90kV 100MVA CI-CI-ENERGIES-30306-CW- RFB / Extension et Reinforcement of Single Stage - One 41,900,000.0 27,326,220. 2019-10- renforcement des réseaux de IDA / 59990 Prior Request for Bids Open - International Signed 2018-01-16 2018-02-20 2018-02-13 2018-02-21 2018-03-27 2018-04-18 2018-04-26 2019-01-24 2018-05-22 2019-01-23 Transmission Systems Envelope 0 21 16 distribution dans 10 chefs lieux de régions- 3 lots CI-CI-ENERGIES-30308-CW- RFB / Passage en souterrain de réseaux HTA aériens Reinforcement of Single Stage - One 40,000,000.0 Under 2020-03- d'Abidjan et remplacement IDA / 59990 Prior Request for Bids Open - International 0.00 2018-03-13 2018-12-19 2018-04-10 2019-01-10 2018-05-22 2018-06-21 2018-07-17 Transmission Systems Envelope 0 Review 25 des câbles HTA de type CPI en câble HTA de type CIS dans les DRAS et DRYOP - 3 lots CI-CI-ENERGIES-30313-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 15,700,000.0 2019-11- IDA / 59990 Support to Electricity for All Prior Request for Bids Open - International 0.00 Canceled 2018-03-13 2018-04-10 2018-05-22 2018-06-21 2018-07-17 de localités dans la région du Envelope 0 28 Program Gbôklè - 5 lots CI-CI-ENERGIES-30315-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 19,100,000.0 2019-11- IDA / 59990 Support to Electricity for All Prior Request for Bids Open - International 0.00 Canceled 2018-03-13 2018-04-10 2018-05-22 2018-06-21 2018-07-17 de localités dans la région du Envelope 0 26 Program Haut Sassandra - 5 lots CI-CI-ENERGIES-30316-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 15,000,000.0 2019-11- IDA / 59990 Support to Electricity for All Prior Request for Bids Open - International 0.00 Canceled 2018-03-13 2018-04-10 2018-05-22 2018-06-21 2018-07-17 de localités dans la région de Envelope 0 26 Program la Nawa - 5 lots CI-CI-ENERGIES-30317-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 18,600,000.0 2019-11- IDA / 59990 Support to Electricity for All Prior Request for Bids Open - International 0.00 Canceled 2018-03-13 2018-04-10 2018-05-22 2018-06-21 2018-07-17 de localités dans la région de Envelope 0 26 Program San Pédro - 5 lots CI-CI-ENERGIES-30548-CW- RFB / Fourniture et Installation de Rehabilitation, transformateurs à Kossou, Reinforcement, and Extension Ferké, Man, Abobo, Taabo et Single Stage - One 55,500,000.0 44,940,082. 2019-11- IDA / 59990 of Distribution Systems in Prior Request for Bids Open - International Signed 2018-01-16 2018-03-09 2018-02-12 2018-03-20 2018-03-26 2018-05-29 2018-04-25 2018-07-23 2018-05-22 2018-09-27 Renforcement et Sécurisation Envelope 0 83 26 Abidjan and 10 Regional des postes de Agboville, Capital cities Attakro, Ayamé, Bongo, Bouaké 1, Abengourou, Dabou, Daloa, Danané et Dimbokro Gagnoa - 4 lots CI-CI-ENERGIES-95225-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 15,700,000.0 2020-11- IDA / 59990 Support to Electricity for All Prior Request for Bids Open - International 0.00 Canceled 2019-04-24 2019-05-21 2019-07-10 2019-07-26 2019-08-23 rurale des localités dans la Envelope 0 15 Program région du Gboklê - 5 Lots CI-CI-ENERGIES-95232-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 18,600,000.0 2020-10- IDA / 59990 Support to Electricity for All Prior Request for Bids Open - International 0.00 Canceled 2019-03-26 2019-04-23 2019-06-12 2019-06-28 2019-07-26 des localités dans la région de Envelope 0 18 Program San Pédro- 5 lots CI-CI-ENERGIES-95234-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 19,100,000.0 13,630,277. 2020-10- IDA / 59990 Support to Electricity for All Prior Request for Bids Open - International Signed 2019-03-26 2019-03-31 2019-04-23 2019-04-04 2019-06-12 2019-05-21 2019-06-28 2019-11-12 2019-07-26 2020-01-09 des localités dans la région du Envelope 0 91 18 Program Haut- Sassandra- 5 lots CI-CI-ENERGIES-95236-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 15,000,000.0 11,691,486. 2020-08- IDA / 59990 Support to Electricity for All Prior Request for Bids Open - International Signed 2019-01-23 2019-01-29 2019-02-19 2019-02-04 2019-04-10 2019-03-26 2019-04-26 2019-06-06 2019-05-24 2019-08-27 des localités dans la région de Envelope 0 30 16 Program la Nawa- 5 lots Page 1 CI-CI-ENERGIES-168080-CW- RFQ / Electrification des localités de Bolorouko, Diomandé carrefour, Leledou, Louloudou, Zuzuoko, Rural Electrification and Request for Single Stage - One 2021-09- Zakareko et Yakassé, IDA / 59990 Support to Electricity for All Post Limited 3,900,000.00 0.00 Canceled 2020-04-15 2020-04-17 2020-06-10 Quotations Envelope 03 Dassioko et Kpata Abidou, Program Gbabililié/Kroukrou(Yoberi), Grogbaledou, Mahamankro, Wawakro, Wawapéko,Zakpberi et Zériberi CI-CI-ENERGIES-168081-CW- RFQ / Electrification des localités de Gnago I et Gnago Rural Electrification and Request for Single Stage - One 2021-07- II, Tripoko, Gnégrouboué, IDA / 59990 Support to Electricity for All Post Limited 3,600,000.00 0.00 Canceled 2020-04-15 2020-04-17 2020-06-10 Quotations Envelope 05 Gobroko, Bolo V1, Bolo V2, Program Bolo V3, Boutoubré I et Zégréboué CI-CI-ENERGIES-168083-CW- RFQ / Construction des lignes MT/BT Gaoulou-Grihiri et Rural Electrification and Request for Single Stage - One 2021-09- Beyo-PK 31 et électrification IDA / 59990 Support to Electricity for All Post Limited 4,100,000.00 0.00 Canceled 2020-04-15 2020-06-10 Quotations Envelope 03 des localités de Grihiri, Program Godekro, Tiazalé, Vodieko, Lohiri (Godiè) et Madinatché CI-CI-ENERGIES-168085-CW- RFQ / Electrification des Rural Electrification and Request for Single Stage - One 2021-06- localités de Balokouya, IDA / 59990 Support to Electricity for All Post Limited 2,100,000.00 0.00 Canceled 2020-04-15 2020-04-17 2020-06-10 Quotations Envelope 05 Gréguibré I, Lobakuya, Medon Program et Zaebré CI-CI-ENERGIES-168086-CW- RFQ / Electrification des Rural Electrification and Request for Single Stage - One 2021-09- localités de Labakuya, Lossan IDA / 59990 Support to Electricity for All Post Limited 2,000,000.00 0.00 Canceled 2020-04-15 2020-04-17 2020-06-10 Quotations Envelope 03 Kouamekro, Pauly brousse, Program Sahoua et Sialloukro CI-CI-ENERGIES-168087-CW- RFQ / Electrification des localité de Djimimbo, Gliké- Rural Electrification and Est, Iratéké, Trahé, Mani Request for Single Stage - One 2021-06- IDA / 59990 Support to Electricity for All Post Limited 3,700,000.00 0.00 Canceled 2020-05-06 2020-07-01 Béréby, Iboké, Grélé, Néro- Quotations Envelope 26 Program Brousse, ouro, Pataké, Grélelon et Roc douGbalél/Roc Oulidié/ SUF CI-CI-ENERGIES-168088-CW- RFQ / Electrification des Rural Electrification and localités de Baba, Dimoulé, Request for Single Stage - One 2021-06- IDA / 59990 Support to Electricity for All Post Limited 4,700,000.00 0.00 Canceled 2020-05-06 2020-07-01 Taboké, Waté, Dagadji, Quotations Envelope 26 Program Djapadji, Gagny, Gnepasso, Dahoro, Gligbeuadji et Goh CI-CI-ENERGIES-168089-CW- RFQ / Electrification des localités de Blahou, Kpoté, Rural Electrification and petit Pedro, Kounouko, Ligne Request for Single Stage - One 2021-09- IDA / 59990 Support to Electricity for All Post Limited 3,700,000.00 0.00 Canceled 2020-05-06 2020-07-01 Gabiadji-san Pédro, Quotations Envelope 24 Program Monogaga, Bloho, Gnity cailloux, Gnaké, Touih et Touré Dougou/SUF CI-CI-ENERGIES-168090-CW- RFQ / Electrification des localités de Soumahorodougou, Rural Electrification and Request for Single Stage - One 2021-06- Cantondougou, Pont Bascule, IDA / 59990 Support to Electricity for All Post Limited 4,300,000.00 0.00 Canceled 2020-05-06 2020-07-01 Quotations Envelope 26 Béoué, Karie, Nekawuinho Program (Neka village), Petit Grabo, Poutou, Youkou, Néro village, petit Guiglo, Podoué et Soto CI-CI-ENERGIES-168091-CW- RFQ / Electrification des localités de Blidouba, Dapo Rural Electrification and Request for Single Stage - One 2021-06- Iboké, Dégné, Déhé, Georges- IDA / 59990 Support to Electricity for All Post Limited 2,200,000.00 0.00 Canceled 2020-05-06 2020-07-01 Quotations Envelope 26 Town, Gnénaholoké, Néro V1 Program et Nero V2, Niplou et tépo Iboké/ SUF CI-CI-ENERGIES-178152-CW- RFB / Electrification des localités de Bolorouko, Diomandé carrefour, Leledou, Louloudou, Zuzuoko, Rural Electrification and Single Stage - One 2,910,065.8 2021-10- Zakareko et Yakassé, IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 3,900,000.00 Signed 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-07-17 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 6 21 Dassioko et Kpata Abidou, Program Gbabililié/Kroukrou(Yoberi), Grogbaledou, Mahamankro, Wawakro, Wawapéko,Zakpberi et Zériberi CI-CI-ENERGIES-178153-CW- RFB / Electrification des localités de Gnago I et Gnago Rural Electrification and Single Stage - One 2,743,732.9 2021-08- II, Tripoko, Gnégrouboué, IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 3,600,000.00 Signed 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-07-17 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 1 22 Gobroko, Bolo V1, Bolo V2, Program Bolo V3, Boutoubré I et Zégréboué CI-CI-ENERGIES-178156-CW- RFB / Construction des lignes MT/BT Gaoulou-Grihiri et Rural Electrification and Single Stage - One 2,915,531.2 2021-10- Beyo-PK 31 et électrification IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 4,100,000.00 Signed 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-07-17 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 9 21 des localités de Grihiri, Program Godekro, Tiazalé, Vodieko, Lohiri (Godiè) et Madinatché CI-CI-ENERGIES-178157-CW- RFB / Electrification des Rural Electrification and Single Stage - One 1,466,529.3 2021-08- localités de Balokouya, IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 2,100,000.00 Terminated 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-07-17 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 4 22 Gréguibré I, Lobakuya, Medon Program et Zaebré Page 2 CI-CI-ENERGIES-178159-CW- RFB / Electrification des Rural Electrification and Single Stage - One 1,532,244.1 2021-08- localités de Labakuya, Lossan IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 2,000,000.00 Terminated 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-08-27 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 6 22 Kouamekro, Pauly brousse, Program Sahoua et Sialloukro CI-CI-ENERGIES-178161-CW- RFB / Electrification des localité de Djimimbo, Gliké- Rural Electrification and Est, Iratéké, Trahé, Mani Single Stage - One 257,870,66 2021-10- IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 3,700,000.00 Terminated 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-03 2020-09-03 2021-03-04 Béréby, Iboké, Grélé, Néro- Envelope 3.61 28 Program Brousse, ouro, Pataké, Grélelon et Roc douGbalél/Roc Oulidié/ SUF CI-CI-ENERGIES-178164-CW- RFB / Electrification des Rural Electrification and localités de Baba, Dimoulé, Single Stage - One 2,930,439.7 2021-08- IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 4,700,000.00 Signed 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-03 2020-09-03 2021-03-16 Taboké, Waté, Dagadji, Envelope 0 29 Program Djapadji, Gagny, Gnepasso, Dahoro, Gligbeuadji et Goh CI-CI-ENERGIES-178165-CW- RFB / Electrification des localités de Blahou, Kpoté, Rural Electrification and petit Pedro, Kounouko, Ligne Single Stage - One 2,417,694.6 2021-10- IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 3,700,000.00 Signed 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-03 2020-09-03 2021-03-09 Gabiadji-san Pédro, Envelope 9 28 Program Monogaga, Bloho, Gnity cailloux, Gnaké, Touih et Touré Dougou/SUF CI-CI-ENERGIES-178166-CW- RFB / Electrification des localités de Soumahorodougou, Rural Electrification and Single Stage - One 1,626,547.9 2021-08- Cantondougou, Pont Bascule, IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 4,300,000.00 Signed 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-14 2020-09-03 2021-03-16 Envelope 5 29 Béoué, Karie, Nekawuinho Program (Neka village), Petit Grabo, Poutou, Youkou, Néro village, petit Guiglo, Podoué et Soto CI-CI-ENERGIES-178168-CW- RFB / Electrification des localités de Blidouba, Dapo Rural Electrification and Single Stage - One 1,251,188.0 2021-08- Iboké, Dégné, Déhé, Georges- IDA / 59990 Support to Electricity for All Post Request for Bids Open - National 2,200,000.00 Signed 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-14 2020-09-03 2021-02-26 Envelope 0 29 Town, Gnénaholoké, Néro V1 Program et Nero V2, Niplou et tépo Iboké/ SUF CI-CI-ENERGIES-189370-CW- DIR / Passage en 225 kV du Rural Electrification and 1,720,403.5 2021-07- poste de Bia Sud: Collecte et IDA / 59990 Support to Electricity for All Prior Direct Selection Direct 1,700,000.00 Signed 2020-08-24 2020-09-09 2020-08-31 2020-09-25 2020-09-26 2020-10-21 5 23 transfert des terres et eaux Program polluées aux micropolluants GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Institutional CI-CI-ENERGIES-30322-GO- Capacity of the Electricity Request for Single Stage - One RFQ / Acquisition et entretien IDA / 59990 Post Limited 862,000.00 724,363.68 Completed 2017-09-27 2017-09-25 2017-11-03 2017-10-30 2017-12-20 2017-12-23 Sector and Project Quotations Envelope de véhicules Management CI-CI-ENERGIES-30325-GO- Strengthening Institutional RFQ / Acquisition de Camion Capacity of the Electricity Request for Single Stage - One IDA / 59990 Post Limited 400,000.00 0.00 Canceled 2018-01-10 2018-02-22 2018-04-10 Labo y compris formation et Sector and Project Quotations Envelope pièces de réchanges Management CI-CI-ENERGIES-95231-GO- RFB / Passage en souterrain de réseaux HTA aériens et Reinforcement of Single Stage - One IDA / 59990 Prior Request for Bids Open - International 40,000,000.00 44,302,794.00 Signed 2019-01-17 2019-01-17 2019-02-26 2019-02-26 2019-03-14 2019-03-19 2019-04-18 2019-04-19 2020-12-08 remplacement des câbles HTA Transmission Systems Envelope de type CPI en CIS dans la ville d'Abidjan - 3 lots CI-CI-ENERGIES-95240-GO- Strengthening Institutional RFQ / Acquisition du camion Capacity of the Electricity Request for Single Stage - One IDA / 59990 Post Limited 400,000.00 0.00 Canceled 2019-01-29 2019-02-11 2019-03-13 2019-07-11 labo y compris formation et Sector and Project Quotations Envelope pièce de réchange Management CI-CI-ENERGIES-95242-GO- Strengthening Institutional RFQ / Acquisition Capacity of the Electricity Request for Single Stage - One IDA / 59990 Post Limited 300.00 0.00 Canceled 2019-01-28 2019-03-07 2019-04-22 d'instruments de mesures et Sector and Project Quotations Envelope de controle- 2 Lots Management CI-CI-ENERGIES-95244-GO- Strengthening Institutional RFQ / Acquisition de materiel Capacity of the Electricity Request for Single Stage - One IDA / 59990 Post Limited 8,500.00 0.00 Canceled 2019-01-22 2019-02-14 2019-03-01 informatique, de bureau et Sector and Project Quotations Envelope consommables informatiques Management Strengthening Institutional CI-CI-ENERGIES-146023-GO- Capacity of the Electricity DIR / FOURNITURES DE DEUX IDA / 59990 Post Direct Selection Direct 601,000.00 585,667.64 Signed 2019-11-25 2019-06-24 2019-11-30 2019-06-24 2020-01-04 2019-12-04 2020-08-31 2020-08-13 Sector and Project CAMIONS LABORATOIRE Management Rehabilitation, CI-CI-ENERGIES-239558-GO- Reinforcement, and Extension Single Stage - One RFB / Acquisition de trente- IDA / 59990 of Distribution Systems in Prior Request for Bids Open - International 26,135,000.00 0.00 Under Review 2021-06-17 2021-06-27 2021-08-10 2021-08-31 2021-10-05 2022-08-01 Envelope trois (33) transformateurs Abidjan and 10 Regional Capital cities NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-CI-ENERGIES-22356-CS- QCBS / Ingénieurs-Conseils pour le contrôle et la Strengthening Institutional surveillance des travaux de Capacity of the Electricity Quality And Cost- IDA / 59990 Prior Open - International 8,300,000.00 0.00 Canceled 2017-09-05 2017-09-12 2017-09-28 2017-10-09 2018-02-11 2017-11-21 2018-02-27 2017-12-12 2018-03-19 2017-12-21 2018-01-25 2019-08-31 transport, distribution et Sector and Project Based Selection électrification rurale - Lot 1: Management Transport- Distribution et Lot 2: Électrification rurale CI-CI-ENERGIES-222501-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional surveillance des travaux de Capacity of the Electricity Quality And Cost- IDA / 59990 Prior Open - International 4,700,000.00 0.00 Under Review 2021-03-03 2021-03-08 2021-03-17 2021-03-09 2021-04-30 2021-05-28 2021-06-27 2021-08-01 2021-09-05 2023-02-27 transport, distribution et Sector and Project Based Selection électrification rurale: Contrôle Management et surveillance des travaux de Transport et de Distribution CI-CI-ENERGIES-220229-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional surveillance des travaux de Capacity of the Electricity Quality And Cost- IDA / 59990 Prior Open - International 4,700,000.00 0.00 Canceled 2021-02-17 2021-02-24 2021-03-03 2021-04-16 2021-05-14 2021-06-13 2021-07-18 2021-08-22 2023-04-14 transport, distribution et Sector and Project Based Selection électrification rurale: Management Contrôle et surveillance des travaux de Transport et de Distribution CI-CI-ENERGIES-220225-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional surveillance des travaux de Capacity of the Electricity Quality And Cost- IDA / 59990 Prior Open - International 3,600,000.00 0.00 Canceled 2021-02-17 2021-02-24 2021-03-03 2021-04-16 2021-05-14 2021-06-13 2021-07-18 2021-08-22 2022-08-22 transport, distribution et Sector and Project Based Selection électrification rurale- Contrôle Management te surveillance des travaux d'Electrification Rurale CI-CI-ENERGIES-226512-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional surveillance des travaux de Capacity of the Electricity Quality And Cost- IDA / 59990 Prior Open - International 4,700,000.00 9,207,945.13 Signed 2017-09-05 2021-03-31 2017-09-26 2017-11-09 2017-12-07 2018-03-27 2018-01-06 2021-03-31 2018-02-10 2021-03-31 2018-03-17 2018-08-23 2019-03-17 transport, distribution et Sector and Project Based Selection électrification rurale- Contrôle Management et surveillance des travaux de Transport et de Distribution CI-CI-ENERGIES-226514-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional surveillance des travaux de Capacity of the Electricity Quality And Cost- IDA / 59990 Post Open - International 3,600,000.00 3,003,233.06 Signed 2017-09-05 2017-08-21 2017-09-26 2017-11-09 2018-01-23 2017-12-07 2018-02-27 2018-01-06 2018-03-12 2018-02-10 2018-06-18 2018-03-17 2018-07-31 2019-03-17 transport, distribution et Sector and Project Based Selection électrification rurale- Contrôle Management te surveillance des travaux d'Electrification Rurale CI-CI-ENERGIES-222502-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional surveillance des travaux de Capacity of the Electricity Quality And Cost- IDA / 59990 Post Open - International 3,600,000.00 0.00 Canceled 2021-03-03 2021-03-08 2021-03-17 2021-04-30 2021-05-28 2021-06-27 2021-08-01 2021-09-05 2023-04-28 transport, distribution et Sector and Project Based Selection électrification rurale: Contrôle Management te surveillance des travaux d'Electrification Rurale INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Institutional CI-CI-ENERGIES-95249-CS- Capacity of the Electricity CDS / Audit comptable et IDA / 59990 Prior Direct Selection Direct 93,000.00 99,106.06 Signed 2019-01-23 2019-01-28 2018-10-08 2019-02-11 2019-05-13 2019-03-01 Sector and Project financier du projet Management CI-CI-ENERGIES-95251-CS- Strengthening Institutional INDV / Consultant individuel Individual Capacity of the Electricity court-terme en appui au IDA / 59990 Post Consultant Limited 10,500.00 10,144.86 Signed 2019-01-21 2019-02-05 2019-01-26 2019-02-08 2019-02-06 2019-04-03 2019-02-15 2019-04-03 2019-02-15 Sector and Project spécialiste genre et Selection Management développement social. CI-CI-ENERGIES-146017-CS- Strengthening Institutional INDV / Recrutement d'un Individual Capacity of the Electricity Consultant International en IDA / 59990 Post Consultant Limited 75,000.00 112,900.00 Completed 2019-11-20 2019-11-28 2019-11-25 2019-11-29 2019-12-16 2020-01-09 2020-01-20 2020-01-30 2021-01-19 2020-09-30 Sector and Project Appui à la Mise en Œuvre des Selection Management Sauvegardes CI-CI-ENERGIES-157500-CS- Strengthening Institutional Individual INDV / Recrutement d'un Capacity of the Electricity IDA / 59990 Post Consultant Limited 50,000.00 1,520.45 Signed 2020-02-06 2020-01-28 2020-02-20 2020-03-19 2020-02-27 2020-04-29 2020-03-08 2020-05-14 2020-07-06 assistant en passation de Sector and Project Selection marchés Management CI-CI-ENERGIES-174199-CS- CDS / Recrutement d'une firme (Hydrogen) en vue de la Strengthening Institutional réalisation du CIES du Projet Capacity of the Electricity de fourniture, d’installation, IDA / 59990 Post Direct Selection Direct 55,000.00 48,057.22 Completed 2020-05-22 2020-06-16 2020-06-01 2020-06-16 2020-06-15 2020-07-06 2020-07-15 2020-12-06 Sector and Project de systèmes de stockage Management d'énergie par batteries 300 MWh & des équipements de synchronisation Page 4 CI-CI-ENERGIES-207215-CS- INDV / Consultant International en appui technique à la mise en œuvre Strengthening Institutional Individual des sauvegardes Capacity of the Electricity IDA / 59990 Post Consultant Direct 108,950.00 108,950.00 Signed 2020-11-30 2020-11-17 2020-12-04 2020-11-17 2020-12-09 2020-11-30 2020-12-19 2020-12-17 2021-12-14 environnementales et Sector and Project Selection sociales, santé et sécurité au Management travail, gestion des plaintes et aspects genre et vulnérabilité dans le cadre du projet CI-CI-ENERGIES-207228-CS- INDV / Recrutement d'un(e) Strengthening Institutional consultant(e) pour Individual Capacity of the Electricity Pending l'élaboration du CIES du projet IDA / 59990 Post Consultant Direct 52,000.00 0.00 2020-12-02 2020-12-14 2020-12-28 2021-01-11 2021-02-10 Sector and Project Implementation de construction et de Selection Management restructuration du réseau HTA de Gagnoa CI-CI-ENERGIES-207241-CS- Strengthening Institutional Individual INDV / Recrutement d'un(e) Capacity of the Electricity IDA / 59990 Post Consultant Limited 86,200.00 3,605.88 Signed 2020-11-30 2020-06-12 2020-12-05 2020-06-18 2020-12-26 2020-11-18 2021-01-30 2020-11-26 2022-12-31 spécialiste en Développement Sector and Project Selection Social et Genre Management CI-CI-ENERGIES-207252-CS- Strengthening Institutional Individual INDV / Recrutement d'un(e) Capacity of the Electricity IDA / 59990 Post Consultant Limited 86,200.00 3,577.22 Signed 2020-11-30 2020-07-03 2020-12-05 2020-06-18 2020-12-26 2020-12-08 2021-01-30 2020-12-08 2022-12-31 spécialiste en sauvegarde Sector and Project Selection environnemental Management CI-CI-ENERGIES-215321-CS- CDS / Contrat avec EDF CI pour le contrôle, la supervision , la surveillance Reinforcement of IDA / 59990 Prior Direct Selection Direct 3,300,000.00 0.00 Canceled 2021-01-25 2021-01-29 2021-03-01 2022-06-24 et le suivi environnemental et Transmission Systems social des ouvrages de Transport et Distribution du PTDAE CI-CI-ENERGIES-207236-CS- INDV / Recrutement d'un(e) Strengthening Institutional consultant(e) pour Individual Capacity of the Electricity l'actualisation du PAR de la IDA / 59990 Post Consultant Direct 34,500.00 0.00 Canceled 2020-12-03 2020-12-15 2021-01-05 2021-01-19 2021-02-18 Sector and Project DRAS dans le cadre du Selection Management passage en souterrain de câbles CI-CI-ENERGIES-207232-CS- INDV / Recrutement d'un(e) Strengthening Institutional consultant(e) pour Individual Capacity of the Electricity l'élaboration du PAR du projet IDA / 59990 Post Consultant Direct 43,000.00 0.00 Canceled 2020-12-03 2020-12-15 2021-01-05 2021-01-19 2021-02-18 Sector and Project de construction et de Selection Management restructuration du réseau HTA de Gagnoa CI-CI-ENERGIES-207238-CS- INDV / Recrutement d'un(e) Strengthening Institutional consultant(e) pour Individual Capacity of the Electricity l'actualisation du CIES de la IDA / 59990 Post Consultant Direct 43,000.00 0.00 Canceled 2020-12-03 2020-12-15 2021-01-05 2021-01-19 2021-02-18 Sector and Project DRAS dans le cadre du Selection Management passage en souterrain de câbles CI-CI-ENERGIES-157499-CS- INDV / RECRUTEMENT D’UN(E) CONSULTANT(E) INDIVIDUEL(LE) CHARGE(E) DE L’ELABORATION DU PLAN Strengthening Institutional Individual D’ACTION DE Capacity of the Electricity IDA / 59990 Post Consultant Limited 44,000.00 0.00 Canceled 2020-02-06 2020-01-02 2020-02-11 2020-03-03 2020-04-07 2021-04-07 REINSTALLATION (PAR) Sector and Project Selection PERSONNES AFFECTEES PAR Management LES TRAVAUX DE CONNEXION DU NOUVEAU POSTE DE GAGNOA AU CHEF-LIEU DE REGION DU GOH Page 5 World Bank Assisted National Agricultural Higher Education Project Education Division Indian Council of Agricultural Research Government of India Procurement Plan (Ist Phase – 18 months ) From : May 2017 to Sept.,2018 1 2 I. General 1. Project information Country : India Borrower : Government of India Project Name : NATIONAL AGRICULTURAL HIGHER EDUCATION PROJECT (NAHEP) Project Identification No (ID) : P151072 : -- Project Implementing Agency (PIA): ICAR and all participating Agriculture Universities 2. Bank’s approval Date of the Initial Procurement Plan: 4. Date of General Procurement Notice: 16th December 2016 Period covered by this procurement plan: First 18 months of the project i.e April, 2017 to Sept., 2018 5. Applicable Bank Guideline: a) For Goods ,Works and Non-consulting Services :"Guidelines: Procurement of Goods, Works and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Procurement Guidelines) and revised July 2014; and b) For Consultancy Services :"Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Consultant Guidelines) and revised July 2014; 3 II. Goods, Works and Non-Consulting Services Category Method of Threshold (US$ Prior review Procurement Equivalent) threshold Goods and International Contracts more than All contracts Non- competitive the equivalent of equal to consulting Bidding (ICB) US$ 3 million per or greater than US$2 services(ex contract million equivalent; cluding TI Limited As per para 3.2 of the contracts) International Guideline , all Bidding Contracts more than the equivalent of US $ 100,000 per contract National Contracts more than competitive the equivalent of US$ Bidding (NCB) 100,000 but less than the equivalent of US$ 3 million per contract (with NCB conditions) Shopping ** Up to $100,000 Direct As per para 3.7 of Contracting(DC) Guidelines Community# As per para 3.19 of Participation the guideline Force Account As per para 3.9 of Guidelines Framework As per para 3.6 of Agreements(FA) Guidelines Works ICB Civil works more or All contracts equal to or equivalent of greater than US$10 US$40,000,000 per million equivalent contract NCB Civil works more than 100,000 and upto $40,000,000 (with NCB conditions) Shopping Civil works up to $100,000 DC As per para 3.7 of Guidelines Community As per para 3.19 of participation# the guideline Force Account As per para 3.9 of Guidelines 4 Category Method of Threshold (US$ Prior review Procurement Equivalent) threshold Consultant CQS/LCS Contracts Up to All contracts equal to or s’ Services $300,000 or less per greater than US$1 contract Million equivalent for Single source As per para 3.9-3.11 firms; and equal to or selection (SSS) of Guidelines greater than Individual As per Section V of US$300,000 equivalent contracts Guidelines for individuals QCBS/QBS/FBS for all other cases (i) International >$800,000 shortlist (ii) Shortlist may Up to $800,000 comprise national consultants only * If a transaction comprises several contracts, lots or slices, the aggregate estimated value of all contracts, lots or slices will determine the applicable threshold amount. **State Rate Contracts cannot be used at par with Shopping. If state rate contract exists for an item, the same can be considered as one of the 3 quotations to be sought under shopping procedures. However DGS&D rate contracts are acceptable under any procurement under the Shopping procedure # Community Procurement would be applicable to activities under learning/training pilots It would be based on World Bank “Guidance Note For Management of Procurement Responsibilities In Community-Driven Development Projects dated December 2009 and as included in the Procurement manual. 2. Pre-qualification: Not Applicable 3. Reference to Project Procurement Manual: A Procurement Manual based on World Bank Guidelines “Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers, January 2011,Revised July 2014”and “Selection and Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank Borrowers” has been prepared. All procurements in the project will be governed by the procedures described in the Manual. In case of any inconsistency between the Procurement Manual and the World Bank Guidelines 2011, Revised July 2014, the provisions of the Guidelines shall prevail. 4. Any Other Special Procurement Arrangements (Goods & Works) : A. Contracts procured in advance will be financed under retroactive financing within the specified limits, as agreed to in the Credit Agreement provided 5 they are procured in accordance with agreed processes and procedures for the project and have been cleared as part of procurement plan. B. National Competitive Bidding (NCB) method for procurement of goods, works and non-consulting services as per the above value thresholds will be conducted in accordance with paragraph 3.3 and 3.4 of the World Bank Procurement Guidelines and the following provisions: (i) Only the model bidding documents for NCB agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding; (ii) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access ) along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids; (iii) No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprises from any given State. (iv) Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; (v) Extension of bid validity shall not be allowed with reference to contracts subject to prior review without the prior concurrence of the World Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for prior approved packages, all subsequent requests for extension irrespective of the period. (Such concurrence will be considered by the Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/Employer); (vi) Re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank. (vii) The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project. (viii) Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however for any procurement under the Shopping procedures. (ix) Two or three envelop system will not be used (except when using e- Procurement system assessed and agreed by the Bank). 6 (x) As per 1.1(e) of World Bank Procurement Guidelines, the Association’s right to inspect accounts and records of the bidders, suppliers and contractors will be included in the bidding document. 7 Selection of Consultants 1. Methods and Value thresholds for Consultancy Services Consulting Methods Value Review Arrangements Services Threshold* Consulting i) Quality and Cost Services Based Selection (Firms) (QCBS) ii) Quality Based Selection (QBS) iii) Selection based on a Fixed Budget (FBS) iv) Selection Based on Least Cost First QCBS Contract Basis (LCS) irrespective of value and v) (Selection based Contracts all subsequent on Consultant’s estimated to cost consultancy contracts Qualification equivalent of valued above US$ 1 (CQS) US$ 200,000 or Million will be subject to less per contract. Prior Review by the World Bank. All other contracts vi) Single Source As per the provisions of will be subject to post Selection (SSS)# paragraph 3.8 to review. 3.11 of Consultant Guidelines Individual i) Competitive As per the Consultants Selection provisions of paragraph 5.1 to 5.6 of Consultant Guidelines ii) Single Source As per the Selection (SSS) provisions of paragraph 5.1 and 5.3 to 5.6 of Consultant Guidelines * If a transaction comprises several packages, lots or slices, the aggregate estimated value of contracts will determine the applicable threshold amount. # Irrespective of contract value any hiring of Government or Research Institutes of unique and exceptional nature requires prior no objection of the World Bank on case to case basis. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US $800,000 equivalent per 8 contract, may comprise entirely of national consultants in accordance with the provisions of Para 2.7 the World Bank Consultant Guidelines. 3. Any Other Special Selection Arrangements (Consulting Services) : (a) Contracts procured in advance will be financed under retroactive financing within the specified limits, as agreed to in the Credit Agreement provided procurement is in accordance with agreed processes and procedures for the project. (b) Requests for Expression of Interest (REOI) for assignments expected to cost more than US$ 300,000 shall be advertised in UNDB online in accordance with Para 2.5 of the Consultant Guidelines. With respect to each contract for the employment of individual consultants estimated to cost the equivalent of US $ 30,000 or more, the qualifications, experience, terms of reference and terms of employment of the consultants shall be furnished to the World Bank for its prior review and No Objection iv) Implementing Agency Capacity Building Activities with Time Schedule S. Expected outcome / Start Date Comments No. Activity Description 1 Training in World Bank To familiarise the online STEP system procurement official in Immediate regard to electronic submissions to the Bank. 2 Trainings in Bank To make procurement Within 3 Procurement at ASCI Officials from participating months of AU’s familiar with WB the procurement procedures negotiations 3 Customized training for Based on the learning from all selected official at PIU the project and hands on Within 3 and selected AU’s. experience a customized months of training to be conducted for effectiveness. strengthening the specific understanding for all IA. 9 PROCUREMENT India : National Agricultural Higher Education Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2019-12-30 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151072 GPN Date: 2016-12-16 Project Name: National Agricultural Higher Education Project Loan / Credit No: IBRD / 87760 A Executing Agency(ies): AU, Anand WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-AAU - ANAND-142118- Support to Agricultural Request for Single Stage - One 2020-09- CW-RFQ / Higher capacity IBRD / 87760 Post Limited 23,300.00 17,919.93 Completed 2020-02-06 2020-02-29 2020-04-02 2020-03-20 Universities Quotations Envelope 29 Split AC for -14 Nos. IN-AAU - ANAND-142133- CW-RFQ / Fresh room cum Support to Agricultural Request for Single Stage - One 2020-09- IBRD / 87760 Post Limited 29,500.00 25,235.63 Completed 2020-02-06 2021-03-15 2020-04-02 2021-03-30 washroom, Furniture and Universities Quotations Envelope 29 electrification IN-AAU - ANAND-142124- CW-RFQ / Training room , Support to Agricultural Request for Single Stage - One 2020-09- Meeting room, PI & Co-PI IBRD / 87760 Post Limited 47,000.00 50,026.23 Completed 2020-02-06 2020-02-11 2020-04-02 2020-03-21 Universities Quotations Envelope 29 room, Technical & research staff Seating Room etc IN-AAU - ANAND-164463- CW-RFQ / Renovation of Office, Server room, Computer Laboratory, Store room, Aluminium Door, window and Support to Agricultural Request for Single Stage - One 2020-12- IBRD / 87760 Post Limited 37,300.00 32,985.82 Completed 2020-04-15 2020-02-11 2020-06-10 2021-01-11 partitions, window grill, Universities Quotations Envelope 07 painting, electrification, fall ceiling, OTS facility creation and other necessary furnishing GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-AAU - ANAND-142156- Under GO-RFQ / AI data & image Support to Agricultural IBRD / 87760 Post Direct Selection Direct 77,500.00 0.00 Implementati 2020-02-01 2021-03-31 2020-02-06 2020-03-12 2020-09-08 extraction subscription to Universities on ISRO, Ahmedabad. IN-AAU - ANAND-142155- Support to Agricultural Request for Single Stage - One GO-RFQ / GPS devices-10 IBRD / 87760 Post Limited 15,000.00 6,918.80 Completed 2020-02-06 2020-01-17 2020-04-02 2020-03-04 2020-09-29 2020-03-09 Universities Quotations Envelope nos. IN-AAU - ANAND-142384- GO-RFQ / External Hard Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 2,800.00 2,465.34 Completed 2020-02-06 2020-02-27 2020-04-02 2020-03-02 2020-09-29 2020-03-02 drives and storage devices - Universities Quotations Envelope 60 Nos. IN-AAU - ANAND-142495- GO-RFQ / Statistical and Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 23,000.00 20,440.65 Completed 2020-02-06 2020-02-26 2020-04-02 2020-03-11 2020-09-29 2020-03-17 analytical software (data Universities Quotations Envelope mining) IN-AAU - ANAND-142497- GO-RFQ / Networking, CCTV Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 15,000.00 11,489.03 Completed 2020-02-06 2020-02-29 2020-04-02 2020-03-18 2020-09-29 2020-03-31 Camera, Intercom & its Universities Quotations Envelope accessories IN-AAU - ANAND-149649- GO-RFQ / Photocopier Support to Agricultural Request for Single Stage - One Machine - 1 Nos. IBRD / 87760 Post Limited 6,150.00 6,732.68 Completed 2020-02-06 2020-02-14 2020-04-02 2020-02-21 2020-09-29 2020-02-21 Universities Quotations Envelope Duplex printer cum scanner - 2 nos. IN-AAU - ANAND-149654- GO-RFQ / Bulk soft copy writer - 1 Nos. Work station - 10 Nos  Support to Agricultural Request for Single Stage - One High end Personal computer IBRD / 87760 Post Limited 92,400.00 88,007.09 Completed 2020-02-06 2020-03-03 2020-04-02 2020-03-13 2020-09-29 2020-03-13 Universities Quotations Envelope and Laptops with peripherals - 36 Nos Computer server - 3 Nos. Tablets - 20 Nos IN-AAU - ANAND-149651- GO-RFQ / Interactive Projector & Screen - 1 Nos. Video Camera with accessories - 1 Nos. Support to Agricultural Request for Single Stage - One Smart LED display TV - IBRD / 87760 Post Limited 28,153.00 18,698.12 Completed 2020-02-06 2020-02-14 2020-04-02 2020-03-23 2020-09-29 2020-03-23 Universities Quotations Envelope Meeting room -4 nos  Public Address System (sets) & its accessories - 1 Nos. DSLR camera with lens and other accessories -1 Nos IN-AAU - ANAND-142486- GO-RFQ / Software for Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 23,000.00 20,939.72 Completed 2020-02-06 2020-10-29 2020-04-02 2020-12-04 2020-09-29 2020-12-15 Artificial Intelligence & Universities Quotations Envelope Applications (Apps) Page 1 IN-AAU - ANAND-149653- GO-RFQ / ADMN. Office Tables - 2 Nos Computer Tables with drawer and necessary accessories - 50 Nos Fixed/ Revolving chair - 20 Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 40,095.00 36,026.89 Completed 2020-02-06 2020-03-06 2020-04-02 2020-03-13 2020-09-29 2020-03-13 Nos Universities Quotations Envelope Revolving chair for laboratory & others staff - 50 Nos  High back revolving chair - 8 Nos PI & Co -PI office tables - 4 Nos IN-AAU - ANAND-149652- GO-RFQ / 10 KVA Online UPS Support to Agricultural Request for Single Stage - One - 3 nos IBRD / 87760 Post Limited 35,300.00 17,684.58 Completed 2020-02-06 2020-03-20 2020-04-02 2020-03-21 2020-09-29 2020-03-31 Universities Quotations Envelope Online Stabilizer- 75 KVA - 1 nos. IN-AAU - ANAND-149646- GO-RFQ / File compactors - 1 Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 18,600.00 10,110.57 Completed 2020-02-06 2020-03-02 2020-04-02 2020-03-09 2020-09-29 2020-03-31 Nos. Universities Quotations Envelope Cabinet for storage - 20 Nos. IN-AAU - ANAND-153049- GO-RFQ / Handheld Spectroradiometer - 1No. Canopy Analyzer (for LAI) - 1 Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 39,200.00 26,301.93 Completed 2020-02-20 2020-01-17 2020-04-16 2020-03-17 2020-10-13 2020-03-23 No. Universities Quotations Envelope Infrared Thermometer - 1 No. SPAD Chlorophyll Meter - 1 No. IN-AAU - ANAND-153097- GO-RFQ / Peripheral & Support to Agricultural Request for Single Stage - One Computer IBRD / 87760 Post Limited 21,500.00 19,055.95 Completed 2020-02-20 2020-02-24 2020-04-16 2020-03-06 2020-10-13 2020-03-31 Universities Quotations Envelope High End Personal Laptop with peripherals - 17 Nos. IN-AAU - ANAND-153100- GO-RFQ / Furniture and Fixture for Training Room, Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 30,100.00 27,193.59 Completed 2020-02-20 2021-01-27 2020-04-16 2021-03-25 2020-10-13 2021-03-31 Meeting cum Conference Universities Quotations Envelope Room and Modular Furniture and Baby Toddler IN-AAU - ANAND-147413- Support to Agricultural IBRD / 87760 Post Direct Selection Direct 15,500.00 2,634.76 Completed 2020-04-13 2020-02-17 2020-04-18 2020-02-17 2020-05-23 2020-03-07 2020-11-19 2020-03-31 GO-DIR / Books and Journals Universities IN-AAU - ANAND-226233- Support to Agricultural GO-DIR / BOOKS AND IBRD / 87760 Post Direct Selection Direct 12,450.00 10,778.21 Completed 2021-04-10 2020-10-23 2021-04-15 2020-10-23 2021-05-20 2021-02-06 2021-11-16 2021-02-22 Universities JOURNALS DIRECT SELECTION IN-AAU - ANAND-226235- Pending Support to Agricultural GO-DIR / BOOKS AND IBRD / 87760 Post Direct Selection Direct 9,310.00 0.00 Implementati 2021-05-01 2021-05-06 2021-06-10 2021-12-07 Universities JOURNALS DIRECT SELECTION on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-AAU - ANAND-196022- CS-CDS / Title: Demand and Supply projections of three components namely Food grains, Fisheries and Milk & Individual Support to Agricultural Milk Products IBRD / 87760 Post Consultant Limited 56,600.00 112,783.22 Signed 2020-11-09 2020-08-07 2020-11-14 2020-08-07 2020-12-05 2020-08-25 2021-01-09 2020-11-18 2021-07-08 Universities Objectives: Demand and Selection Supply projections of 1. Food grains. 2. Fisheries. 3. Milk and Milk products IN-AAU - ANAND-196023- CS-CDS / Title: Growth and Export Opportunities of major value added food products. Objectives: Study on Market Individual Support to Agricultural Competitiveness of Dairy IBRD / 87760 Post Consultant Limited 5,600.00 11,550.09 Signed 2020-11-09 2020-08-26 2020-11-14 2020-08-26 2020-12-05 2020-09-04 2021-01-09 2020-11-18 2021-07-08 Universities Commodities Selection Growth and Export Opportunities of : Major Value-added processed food products manufactured from Vegetables and Fr Page 2 IN-AAU - ANAND-196035- CS-CDS / Title: A study on performance of Farmer Producer Organization (FPOs) in Gujarat Individual Objectives: To study the Support to Agricultural IBRD / 87760 Post Consultant Limited 8,250.00 10,870.67 Signed 2020-11-09 2020-08-26 2020-11-14 2020-08-26 2020-12-05 2020-09-25 2021-01-09 2020-11-16 2021-07-08 structure, conduct and Universities Selection performance of FPOs. To identify the factors influencing performance FPOs. To analyze the impact of FPOs on Farmers economy IN-AAU - ANAND-220402- CS-INDV / Market Potential and Trade Competitiveness of selected Agro-commodities in India To analyse the trend and Individual Support to Agricultural instability,India’s volume and IBRD / 87760 Post Consultant Direct 9,400.00 10,910.18 Signed 2021-04-12 2021-02-09 2021-04-22 2021-02-09 2021-05-13 2021-02-15 2021-06-17 2021-05-25 2021-12-14 Universities direction of trade ,market Selection potential and trade competitiveness and challenges in trade of selected agri commodities. IN-AAU - ANAND-164472- CS-CDS / Enhancing Agricultural Market Intelligence using Digital Knowledge Agribusiness Ecosystem platform for Support to Agricultural Under generating primary digital IBRD / 87760 Post Direct Selection Direct 46,550.00 0.00 2021-04-14 2020-08-25 2021-04-24 2021-06-28 2021-12-25 Universities Implementation continuous data streams. Deploy the Digital Agribusiness Ecosystems, agrifood value chains, generating market intelligence IN-AAU - ANAND-163715- CS-CDS / IRMA - Anand Support to Agricultural Purpose: Collaborative work IBRD / 87760 Post Direct Selection Direct 7,755.00 0.00 Canceled 2020-04-10 2020-04-20 2020-06-24 2020-12-21 Universities on capacity building programme and FPO. IN-AAU - ANAND-164469- CS-CDS / Agri Digital Media Support to Agricultural IBRD / 87760 Post Direct Selection Direct 3,100.00 0.00 Canceled 2020-04-10 2020-04-20 2020-06-24 2020-12-21 Purpose: Dissemination of Universities information through ICT tools. IN-AAU - ANAND-164471- CS-CDS / Papua New Guinea Uni. of Technology Support to Agricultural Purpose: Will provide IBRD / 87760 Post Direct Selection Direct 4,700.00 0.00 Canceled 2020-04-10 2020-04-20 2020-06-24 2020-12-21 Universities methodology for global market intelligence in major crop. IN-AAU - ANAND-164468- CS-CDS / National Cooperative Dairy Federation of India Limited Support to Agricultural Purpose: Will contribute to the IBRD / 87760 Post Direct Selection Direct 4,700.00 0.00 Canceled 2020-04-10 2020-04-20 2020-06-24 2020-12-21 Universities fulfillment of methodology part of price forecast for the Dairy and Animal Husbandry Products. IN-AAU - ANAND-164467- CS-CDS / Title: Price Support to Agricultural IBRD / 87760 Post Direct Selection Direct 4,700.00 0.00 Canceled 2020-11-10 2020-11-20 2021-01-24 2021-07-23 forecasting of Oil Seed crop Universities for short and long term IN-AAU - ANAND-207926- CS-INDV / Price Volatility, Price Discovery and Relationship between Spot and Futures Prices in Individual Support to Agricultural Under Agricultural Commodity IBRD / 87760 Post Consultant Limited 7,400.00 8,918.10 2021-04-25 2020-08-31 2021-04-30 2020-08-31 2021-05-21 2020-11-28 2021-06-25 2021-12-22 Universities Implementation Markets in India. To measure Selection the degree of price instability of selected agricultural commodities in major domestic markets of India Page 3 PROCUREMENT PLAN (Textual Part) Project information: Maldives, Maldives Urban Development & Resilience (P163957) Project Implementation agency: Ministry of National Planning and Infrastructure Date of the Procurement Plan: September 12, 2019 Period covered by this Procurement Plan: September 12, 2019– March 12, 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Chapter on Public Procurement for Maldives’ Public Finance Regulations 2017, Chapter 10 – State Procurement System, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. 1) Only bidding documents acceptable to the Bank shall be used for all national open competitive procurement. 2) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) In case of Open Tendering, the receipt of less than three bids shall not be considered grounds for cancellation and re-invitation of bids. 6) Bid shall not be rejected merely on the basis of a comparison with an official estimate. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Not Applicable Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Not Applicable Table 5.1. Procurement Methods to Be Used in the Project Applicable for ‘High’ risk Expenditur Contract Value Procurement Contracts/ e Category (threshold) Method Processes Subject to Prior Review ≥US$100,000 Open International All contracts over Goods • D ¡ f € / ¨ â ¡ Monitoring and Evaluation Selection Consultant CN-GXFCPRPMC-69880-CS- Project Management, IBRD / 86700 Post Qualification Open - National 73,800.00 71,447.71 Completed 2018-07-24 2018-07-27 2018-08-14 2018-12-25 2018-09-27 2018-09-03 2018-10-27 2018-09-28 2018-12-01 2018-11-01 2019-05-30 2019-10-31 CQS / \ > ù - Œ ý › ú ¾ Monitoring and Evaluation Selection GXSJ-ZX-05 / Project Management- provide project management consulting Project Management, Quality And Cost- services for project IBRD / 86700 Post Open - International 984,600.00 723,554.08 Signed 2019-01-23 2019-01-25 2019-02-13 2019-03-12 2019-03-29 2019-04-30 2019-04-26 2019-06-17 2019-05-26 2019-06-17 2019-06-30 2019-07-04 2019-08-04 2019-08-30 2020-08-03 Monitoring and Evaluation Based Selection manangement offices in autonomous regions, cities and counties GXSJ-ZX-06 / Monitoring assessment from the thrid Consultant party-provide external Project Management, IBRD / 86700 Post Qualification Open - National 298,500.00 271,863.65 Signed 2019-01-25 2019-01-25 2019-02-15 2019-03-31 2019-03-25 2019-04-30 2019-07-27 2019-06-04 2019-08-30 2019-12-01 monitoring and evaluation for Monitoring and Evaluation Selection the project from the thrid party GXSJ-ZX-07 / Project financial guidance and inspection -To provide Consultant Project Management, financial guidance, inspection IBRD / 86700 Post Qualification Open - National 276,900.00 249,371.34 Signed 2019-03-31 2019-04-22 2019-04-21 2019-06-04 2019-05-09 2019-07-04 2019-05-28 2019-08-08 2019-06-14 2020-02-04 Monitoring and Evaluation and consulting services for Selection PMOs in autonomous regions, cities and counties GXSJ-ZX-08 / Purchase of consulting service for Consultant Business Incubation Center Enhancing Investments in IBRD / 86700 Post Qualification Open - National 184,615.38 165,728.49 Signed 2020-05-07 2020-05-11 2020-05-21 2020-06-11 2020-06-08 2020-07-11 2020-07-14 2020-08-15 2020-07-08 2021-02-11 information platform (APP) Poor Areas Selection development, operation and maintenance INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GXPG-ZX-2021-01 / Pingguo Individual Improvement of Pro-Poor Under BIC purchases legal IBRD / 86700 Post Consultant Open 10,000.00 0.00 2021-03-01 2021-01-05 2021-04-19 2021-05-10 2021-06-14 2022-05-11 Value Chains Implementation consultancy service. Selection GXSJ-ZX-09 / Publicity Public Infrastructure and Pending service of Guangxi Poverty IBRD / 86700 Post Direct Selection Direct 46,153.85 0.00 2021-05-20 2021-05-30 2021-08-03 2022-01-30 Services Implementation Alleviation Pilot Project Page 2 PROCUREMENT PLAN FOR PROJECT PREPARATION ADVANCE (PPA) Project information: Nigeria Identification for Development (ID4D) Project - (P167183) Project Implementation agency: Youth Employment and Social Support (YESSO) is implementing the PPA on behalf of the National Identity Management Commission Date of the Procurement Plan: August 17, 2018 Period covered by this Procurement Plan: August 2018 to November 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Nigeria Public Procurement Act 2007, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [15% is applicable for those contracts identified in the Procurement Plan tables]; Works: [ 7.5% is applicable for those contracts identified in the Procurement Plan tables] I. Threshold for Prior Review, Procurement Approaches and Methods – Good, Works and Non- Consulting Services Procurement Approaches and Methods (US$ millions) Prior Review Category Open Open Request for (US$ millions) International National Quotation (RfQ) Works ≥5 ≥ 20 < 20 ≤ 0.2 Goods, IT, and non-consulting ≥ 1.5 ≥5 <5 ≤ 0.1 services Post Review: All contracts not subject to prior review shall be subject to post review. Summary of the procurement packages for Goods Sr Contract Estima Revie Market Selectio Evaluation Options Prequ Domesti Expecte Expecte Expected . Description ted w by Approac n (Most al- c d date d date of completi N Cost Bank h (Open- Method Advantageous Bid, ificatio Preferen of bid/ Contract on date o (US$) (Prior/ National/ (RFP, BAFO, Rated n ce proposal Signatur Post) Limited RFB, Criteria etc.) (Yes/ (Yes/No) opening e etc.) RFQ, DS No) etc.) 1 Procurement of 200,00 Post Open/ RFB Most Advantag- No No 03/12/18 10/01/20 01/03/19 Office Furniture 0 National eous Bid 19 and supplies for project coordination 2 Supply of 100,00 Post Limited RFQ Most Advantag- No No 22/10/18 30/10/20 30/11/201 computers and 0 eous Bid 18 8 software for M&E 3 Supply of 300,00 Post Open/ RFB Most Advantag- No No 15/12/20 14/01/20 28/02/201 biometric 0 National eous Bid 18 19 9 equipment including computers and software 4 Financial 10,000 Post Direct DIR Direct No No 17/10/20 31/10/20 30/11/201 management 18 18 8 software Total Goods 610,000 II. Thresholds for Prior Review, Selection Approaches and Methods – Consulting Services Category Prior Review Short List of National Consultants (US$ millions) Consulting Engineering and Construction Supervision Services Consultants (Firms) ≥ 0.5 ≤ 0.3 ≤ 0.5 Individual Consultants ≥ 0.2 Note: Consultancy services estimated to cost equivalent to US $ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or national newspaper. III. Summary of the procurement packages for Consulting Services Sr. Contract Estimate Revie Market Selection Expected Expected Expected No Description d Cost w by Approach Method date of bid/ date of date of (US$) Bank (Open - (QCBS, FBS, proposal Contract Completion (Prior/ International/ LCBS, QBS, opening Signature date Post) National/ CQS, DS etc.) etc.) 1 Social Assessment Limited / for Nigeria National 295,000 POST CQS Identification for Development Project 15/08/2018 31/08/2018 21/12/2018 2 Project Coordinator, Open / National National Identity 60,000 POST INDV Management Commission NA 01/10/2018 01/10/2019 3 Operations Open / National Specialist, National 40,000 POST INDV Identity Management Commission NA 02/11/2018 01/11/2019 4 Senior M&E Open / National Specialist, National 40,000 POST INDV Identity Management Commission NA 02/11/2018 02/11/2019 5 M&E Specialist, Open / National National Identity 30,000 POST INDV Management Commission NA 05/11/2018 05/11/2019 6 Financial Open / National Management Specialist, National 30,000 PRIOR INDV Identity Management Commission NA 06/11/2018 06/11/2019 7 Procurement Open / National Specialist, National 30,000 PRIOR INDV Identity Management Commission NA 07/11/2018 07/11/2019 8 Project Assistant, , Open / National National Identity 20,000 POST INDV Management Commission NA 08/11/2018 08/11/2019 9 Coordinator, Office of Open / National 60,000 POST INDV the Vice President NA 09/11/2018 09/11/2019 10 Technical expert, eID Open / National and Systems 40,000 POST INDV Integration, Office of the Vice President NA 12/11/2018 12/11/2019 11 M&E Specialist, Open / National Office of the Vice 40,000 POST INDV President NA 13/11/2018 13/11/2019 12 Communication and Open / National Awareness Specialist, 40,000 POST INDV Office of the Vice President NA 14/11/2018 14/11/2019 13 Social Development Open / National Specialist, Office of 40,000 POST INDV the Vice President NA 15/11/2018 15/11/2019 14 Financial Open / National Management 30,000 PRIOR INDV Specialist, Office of the Vice President NA 16/11/2018 16/11/2019 15 Procurement Open / National Specialist, Office of 30,000 PRIOR INDV the Vice President NA 19/11/2018 19/11/2019 16 Consultant to draft Limited / detailed Project National 50,000 POST INDV Implementation Manual NA 20/11/2018 20/01/2019 17 Consultant to draft Limited / Manual of Procedures National 10,000 POST INDV for Financial Mangement NA 21/11/2018 21/01/2019 18 Consultant to design Limited / a monitoring and 50,000 POST National INDV evaluation plan NA 22/11/2018 21/01/2019 19 Consultant to draft Limited / Environmental and National 17,000 POST INDV Social Management Framework NA 03/09/2018 17/10/2018 20 Consultant to draft Limited / Resettlement Policy 17,000 POST National INDV Framework NA 03/09/2018 17/10/2018 21 Consultant (short Limited / term) to assist in National procurement of 15,000 POST INDV project preparation activities NA 01/08/2018 31/12/2018 22 Consultant to design Limited / the project Grievance 42,000 POST National INDV Redress Mechanism NA 23/11/2018 29/01/2019 23 Consultant to Limited / develop a National 50,000 POST INDV communications strategy NA 26/11/2018 25/01/2019 24 Firm to develop and Open / National carry out public communications and 230,000 POST CQS awareness campaigns 10/12/2018 25/01/2019 15/06/2019 25 Technical support for Limited / drafting any National necessary new 299,000 PRIOR CQS legislation and amendments to existing legislation 10/12/2018 15/01/2019 15/04/2019 26 Institutional analysis Limited / and capacity National 100,000 POST CQS assessment of institutions 02/10/2018 29/10/2018 15/01/2019 implicated in the implementation of the ID4D project 27 Study on HR Limited / capacity-building National 100,000 POST INDV strategy for NIMC for ID4D implementation NA 27/11/2018 22/01/2019 28 Risks assessment of Limited / ID4D project National implementation, including risks of 50,000 POST INDV data protection and privacy (but not including social and environmental risks) NA 28/11/2018 23/01/2019 29 Cybersecurity and Open / data protection International assessment for 200,000 POST CQS identification ecosystem and Action Plan 15/08/2018 28/09/2018 28/02/2019 30 Drafting technical Limited / system specifications National for selected enrollment partners 100,000 POST INDV and functional users of the National ID registry NA 29/11/2018 28/02/2019 31 Firm to carry out Limited / consultations with National beneficiaries and 250,000 POST CQS stakeholders during project preparation 15/08/2018 28/09/2018 21/12/2018 Total Consultancy 2,405,00 Services 0 PROCUREMENT Nigeria : Nigeria Digital Identification for Development Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2019-07-09 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167183 GPN Date: Project Name: Nigeria Digital Identification for Development Project Loan / Credit No: IDA / V2290 National Identity Management Commission Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NIMC-PPA-13 / NIMC PIU: Procurement of Office Component 4: Project Request for Single Stage - One Furniture and supplies for IDA / V2290 Management and Stakeholder Post Limited 100,000.00 76,516.84 Signed 2019-07-27 2020-02-03 2019-09-07 2020-06-23 2019-10-07 Quotations Envelope project coordination (Tables Engagement and Chairs) NIMC-PPA-14 / NIMC PIU: Procurement of Office Component 4: Project Request for Single Stage - One Furniture and supplies for IDA / V2290 Management and Stakeholder Post Limited 90,000.00 72,297.86 Signed 2019-07-27 2020-02-03 2019-09-21 2020-06-23 2019-10-21 Quotations Envelope project coordination (Electrical Engagement Appliances) Component 4: Project Pending NIMC-PPA-18 / Financial IDA / V2290 Management and Stakeholder Post Direct Selection Direct 10,000.00 0.00 Implementati 2019-08-04 2019-08-09 2019-09-13 2019-11-15 Management Software Engagement on NG-NIMC-169497-GO-RFQ / Procurement of Equipment to Component 4: Project Request for Single Stage - One support Virtual Office IDA / V2290 Management and Stakeholder Post Limited 30,000.00 26,366.33 Signed 2020-04-29 2020-04-28 2020-06-24 2020-05-13 2020-08-23 Quotations Envelope requirements during COVID- Engagement 19 Lockdown NG-NIMC-PPA-57-1 / Procurement of items to support Reopening NIMC Component 2: Establishing a Under enrolment services and offices Single Stage - One IDA / V2290 Robust and Inclusive Post Request for Bids Limited 365,000.00 0.00 Implementati 2020-07-20 2020-08-17 2020-07-25 2020-08-17 2020-08-08 2020-09-03 2020-08-22 2020-09-03 2020-09-12 2020-10-12 across the nation under the Envelope Foundational ID System on COVID-19 Lockdown (Pharmaceutical and General Supplies) NG-NIMC-PPA-57-2 / Procurement of items to support Reopening NIMC Component 2: Establishing a Under Request for Single Stage - One enrolment services and offices IDA / V2290 Robust and Inclusive Post Limited 75,000.00 0.00 Implementati 2020-07-25 2020-08-17 2020-09-19 2020-10-19 Quotations Envelope across the nation under the Foundational ID System on COVID-19 Lockdown (Printing/Banners/Posters) NG-NIMC-PPA-68 / Procurement of Furniture and Office Equipment for Component 4: Project Pending Request for Single Stage - One Allocated Office Space for the IDA / V2290 Management and Stakeholder Post Limited 100,000.00 0.00 Implementati 2020-11-28 2021-01-23 2021-02-22 Quotations Envelope ECSU in Office of the Secretary Engagement on to the Government of the Federation NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NIMC-PPA-25 / Firm to carry Component 4: Project Consultant out consultations with Under IDA / V2290 Management and Stakeholder Post Qualification Limited 250,000.00 0.00 2019-07-22 2019-08-26 2019-08-05 2019-09-04 2019-09-18 2020-03-19 beneficiaries and stakeholders Implementation Engagement Selection during project preparation NIMC-PPA-28 / Firm to Component 4: Project Consultant develop and carry out public Under IDA / V2290 Management and Stakeholder Post Qualification Open - National 225,000.00 0.00 2019-07-22 2019-08-26 2019-08-12 2019-09-25 2019-10-25 2019-11-08 2020-03-10 communications and Implementation Engagement Selection awareness campaigns NIMC-PPA-29 / Technical support for drafting any Component 1: Strengthening Consultant Pending necessary new legislation and IDA / V2290 the Legal and Institutional Post Qualification Open - National 299,000.00 0.00 2019-07-22 2019-08-12 2019-09-01 2019-10-01 2019-10-15 2020-04-15 Implementation amendments to existing Framework Selection legislation NIMC-PPA-33 / Cybersecurity and data Component 1: Strengthening Consultant protection assessment for IDA / V2290 the Legal and Institutional Post Qualification Limited 200,000.00 158,897.20 Completed 2018-09-03 2018-08-01 2018-09-17 2018-11-02 2018-10-17 2019-04-01 2018-11-21 2019-04-08 2019-05-23 2020-02-20 identification ecosystem and Framework Selection Action Plan Page 1 Component 4: Project Consultant NIMC-PPA-37 / Firm to carry IDA / V2290 Management and Stakeholder Post Qualification Limited 295,000.00 216,823.02 Signed 2018-07-23 2018-09-04 2018-08-06 2018-09-04 2018-09-05 2018-10-23 2018-10-10 2018-10-24 2019-04-08 out Social Assessment (SA) Engagement Selection NIMC-PPA-30 / Institutional analysis and capacity Component 1: Strengthening Consultant assessment of institutions IDA / V2290 the Legal and Institutional Post Qualification Limited 100,000.00 0.00 Canceled 2019-07-22 2019-08-26 2019-08-05 2019-09-04 2019-09-18 2020-01-19 implicated in the Framework Selection implementation of the ID4D project NG-NIMC-PPA-67 / Consultancy for Furniture Component 4: Project Consultant Needs Assessment and Design IDA / V2290 Management and Stakeholder Post Qualification Limited 30,000.00 0.00 Under Review 2020-10-20 2020-11-27 2020-10-27 2020-11-03 2020-11-17 2020-12-17 for Allocated Office Space for Engagement Selection the ECSU NG-NIMC-PPA-63 / Consultancy Services for the Component 4: Project Consultant Development of Grievance IDA / V2290 Management and Stakeholder Post Qualification Open - National 250,000.00 0.00 Canceled 2020-12-14 2020-12-10 2020-12-28 2021-01-25 2021-02-08 2021-03-08 2021-09-04 Redress Mechanism for ID4D Engagement Selection Ecosystem NG-NIMC-PPA-66 / Component 4: Project Consultant Consultancy Services for IDA / V2290 Management and Stakeholder Post Qualification Open - National 250,000.00 0.00 Canceled 2020-12-14 2020-12-28 2021-01-25 2021-02-08 2021-03-08 2021-09-04 Project Management Support Engagement Selection to ID4D Ecosystem NG-NIMC-PPA-64 / Consultancy Services for the Component 4: Project Consultant Development of a IDA / V2290 Management and Stakeholder Post Qualification Open - National 250,000.00 0.00 Canceled 2020-12-14 2020-12-10 2020-12-28 2021-04-21 2021-01-25 2021-02-08 2021-03-08 2021-09-04 Communication Strategy for Engagement Selection the ID4D Ecosystem NG-NIMC-PPA-69 / Consultancy Services for the Component 4: Project Consultant Under Development of Grievance IDA / V2290 Management and Stakeholder Post Qualification Open - National 300,000.00 0.00 2021-01-04 2021-01-08 2021-01-18 2021-04-21 2021-03-03 2021-03-17 2021-04-14 2021-10-11 Implementation Redress Mechanism for ID4D Engagement Selection Ecosystem NG-NIMC-PPA-70 / Consultancy Services for the Component 4: Project Quality And Cost- Under Development of a IDA / V2290 Management and Stakeholder Post Open - National 450,000.00 0.00 2021-01-04 2021-01-08 2021-01-18 2021-04-21 2021-03-03 2021-03-17 2021-03-31 2021-04-28 2021-05-26 2021-11-22 Based Selection Implementation Communication Strategy for Engagement the ID4D Ecosystem NG-NIMC-PPA-71 / Component 4: Project Consultancy Services for Quality And Cost- Under IDA / V2290 Management and Stakeholder Post Open - International 600,000.00 0.00 2021-01-04 2021-01-08 2021-01-18 2021-04-21 2021-02-15 2021-03-01 2021-03-15 2021-04-05 2021-05-10 2022-05-10 Project Management Support Based Selection Implementation Engagement to ID4D Ecosystem NG-NIMC-PPA-65 / Consultancy Services for Definition of Architecture and Implementation Arrangements Component 4: Project Consultant for the ID4D Ecosystem, Under IDA / V2290 Management and Stakeholder Prior Qualification Limited 1,600,000.00 0.00 2021-01-04 2021-02-10 2021-01-18 2021-02-01 2021-03-01 2021-08-28 including Implementation Implementation Engagement Selection Strategy, Requirements Catalogue, Business Model, and Licensing and Assurance Framework NG-NIMC-PPA-72 / Component 4: Project Consultant Appointment of Firm for the Under IDA / V2290 Management and Stakeholder Post Qualification Limited 20,000.00 0.00 2021-05-19 2021-05-21 2021-05-23 2021-05-27 2021-06-04 2021-06-25 External Audit of the Nigeria Implementation Engagement Selection ID4D Project INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Project Individual NIMC-PPA-01 / NIMC PIU: IDA / V2290 Management and Stakeholder Post Consultant Direct 100,000.00 0.00 Canceled 2019-07-22 2019-08-01 2019-08-08 2019-08-22 2020-02-21 Project Coordinator Engagement Selection Component 4: Project Individual NIMC-PPA-04 / NIMC PIU: IDA / V2290 Management and Stakeholder Post Consultant Limited 30,000.00 0.00 Under Review 2019-07-22 2019-08-28 2019-07-27 2019-08-03 2019-08-17 2020-02-16 Grievance Redress Manager Engagement Selection Component 1: Strengthening Individual NIMC-PPA-09 / NIMC PIU: IDA / V2290 the Legal and Institutional Post Consultant Limited 50,000.00 0.00 Under Review 2019-07-22 2019-07-24 2019-08-07 2019-08-14 2019-08-28 2020-02-27 Cybersecurity Specialist Framework Selection Component 1: Strengthening Individual NIMC-PPA-10 / OVP SCU: IDA / V2290 the Legal and Institutional Post Consultant Limited 40,000.00 0.00 Under Review 2019-07-22 2019-08-28 2019-07-27 2019-08-03 2019-08-17 2020-02-16 Senior Program Officer Framework Selection NIMC-PPA-16 / Consultant Component 4: Project Individual for the draft of a detailed IDA / V2290 Management and Stakeholder Post Consultant Limited 50,000.00 20,233.43 Signed 2019-07-22 2019-10-15 2019-07-27 2020-03-18 2019-08-17 2020-04-20 2019-08-31 2020-05-06 2020-03-01 Project Implementation Engagement Selection Manual (overall project) NIMC-PPA-17 / Consultant to Component 4: Project Individual draft Manual of Procedures for IDA / V2290 Management and Stakeholder Post Consultant Limited 10,000.00 8,537.50 Signed 2019-07-22 2019-10-14 2019-07-27 2020-03-18 2019-08-03 2020-04-20 2019-08-17 2020-05-06 2019-10-19 Financial Management Engagement Selection NIMC-PPA-19 / Consultant Component 4: Project Individual for the design for Monitoring IDA / V2290 Management and Stakeholder Post Consultant Limited 50,000.00 0.00 Under Review 2019-07-22 2019-08-28 2019-07-27 2019-08-17 2019-08-31 2019-12-02 and Evaluation Plan Engagement Selection NIMC-PPA-20 / Consultant Component 4: Project Individual (short term) to assist in IDA / V2290 Management and Stakeholder Prior Consultant Limited 15,000.00 0.00 Canceled 2019-01-14 2019-01-19 2019-02-09 2019-03-16 2019-06-16 procurement of Project Engagement Selection Preparation activities Page 2 NIMC-PPA-23 / Consultant to Component 4: Project Individual draft Environmental and Social IDA / V2290 Management and Stakeholder Post Consultant Limited 17,000.00 12,000.00 Signed 2018-09-03 2018-09-11 2018-09-08 2018-09-11 2018-09-29 2018-10-08 2018-10-13 2018-10-10 2019-04-14 Management Framework Engagement Selection NIMC-PPA-24 / Consultant to Component 4: Project Individual draft Resettlement Policy IDA / V2290 Management and Stakeholder Post Consultant Limited 17,000.00 12,216.49 Signed 2018-09-03 2018-09-11 2018-09-08 2018-09-11 2018-09-29 2018-10-08 2018-11-03 2018-10-10 2019-05-05 Framework Engagement Selection NIMC-PPA-31 / Study on HR capacity-building for NIMC for Component 1: Strengthening Individual ID4D implementation Under IDA / V2290 the Legal and Institutional Post Consultant Limited 100,000.00 0.00 2019-09-10 2019-08-26 2019-09-15 2019-10-06 2019-10-20 2020-01-21 including revised Implementation Framework Selection organizational arrangements and staffing plan Component 4: Project Individual NIMC-PPA-05 / NIMC PIU: IDA / V2290 Management and Stakeholder Post Consultant Limited 30,000.00 0.00 Under Review 2019-07-31 2019-08-28 2019-08-14 2019-08-28 2019-09-11 2020-03-12 Safeguards Officer Engagement Selection Component 4: Project Individual NIMC-PPA-36 / NIMC PIU: IDA / V2290 Management and Stakeholder Post Consultant Limited 100,000.00 79,502.98 Signed 2018-09-15 2018-10-17 2018-09-20 2018-12-14 2018-10-11 2019-01-18 2018-11-15 2019-01-31 2019-05-14 Team Lead Engagement Selection NIMC-PPA-12 / Consultant Component 4: Project Individual (short term) to assist in Under IDA / V2290 Management and Stakeholder Post Consultant Limited 15,000.00 0.00 2018-10-12 2018-10-17 2018-11-07 2018-12-12 2019-06-10 procurement of Project Implementation Engagement Selection Preparation activities NG-NIMC-130237-CS-CDS / Consultant (short term) to Component 4: Project Under assist in procurement of IDA / V2290 Management and Stakeholder Post Direct Selection Direct 10,000.00 0.00 2019-09-06 2019-09-18 2019-09-16 2019-09-27 2019-10-01 2019-12-30 Implementation Project Preparation activities Engagement (Extension) NIMC-PPA-34 / Drafting technical system Component 1: Strengthening Individual specifications for selected IDA / V2290 the Legal and Institutional Post Consultant Limited 100,000.00 0.00 Canceled 2019-07-22 2019-08-26 2019-07-27 2019-08-17 2019-08-31 2019-12-02 enrollment partners and Framework Selection functional users of the National ID registry NIMC-PPA-32 / Risks assessment of ID4D project implementation, including Component 1: Strengthening Individual risks of data protection and IDA / V2290 the Legal and Institutional Post Consultant Limited 50,000.00 0.00 Canceled 2019-07-22 2019-08-26 2019-07-27 2019-08-17 2019-08-31 2020-01-01 privacy (but not including Framework Selection social and environmental risks) NG-NIMC-169507-CS-CDS / Component 4: Project Individual NIMC PIU: Procurement Officer IDA / V2290 Management and Stakeholder Prior Consultant Direct 60,000.00 27,783.51 Signed 2020-05-04 2020-05-04 2020-05-14 2020-05-20 2020-05-28 2020-06-02 2020-06-25 2020-06-03 2020-12-22 (New) Engagement Selection Component 4: Project Individual NG-NIMC-PPA-41 / PIU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 40,000.00 0.00 2020-05-27 2020-07-13 2020-07-01 2020-07-08 2020-07-22 2020-12-31 Coordinator Implementation Engagement Selection NG-NIMC-PPA-42 / PIU: Component 4: Project Individual Under Environmental Safeguard IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-05-27 2020-07-13 2020-07-01 2020-07-08 2020-07-22 2020-12-31 Implementation Officer Engagement Selection Component 4: Project Individual NG-NIMC-PPA-44 / PIU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-05-27 2020-07-09 2020-07-01 2020-07-08 2020-07-22 2020-12-31 Biometric Architect Implementation Engagement Selection NG-NIMC-PPA-45 / PIU: Component 4: Project Individual Under Business Analyst/Process IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-05-27 2020-06-18 2020-07-01 2020-07-08 2020-07-22 2020-12-31 Implementation Architect Engagement Selection NG-NIMC-PPA-46 / ECSU: Component 4: Project Individual Under External Communications IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-05-27 2020-07-13 2020-07-01 2020-07-08 2020-07-22 2020-12-31 Implementation Manager Engagement Selection Component 4: Project Individual NG-NIMC-PPA-47 / ECSU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-05-27 2020-07-13 2020-07-01 2020-07-08 2020-07-22 2020-12-31 M&E Specialist Implementation Engagement Selection Component 4: Project Individual NG-NIMC-PPA-48 / ECSU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 20,000.00 0.00 2020-05-27 2020-06-20 2020-07-01 2020-07-08 2020-07-22 2020-12-31 Communications Assistant Implementation Engagement Selection Component 1: Strengthening Individual NIMC-PPA-11 / OVP SCU: IDA / V2290 the Legal and Institutional Post Consultant Limited 40,000.00 0.00 Canceled 2019-07-22 2019-08-28 2019-07-27 2019-08-03 2019-08-17 2020-02-16 Communications Specialist Framework Selection Component 4: Project Individual NG-NIMC-PPA-50 / ECSU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-06-30 2020-07-13 2020-08-04 2020-08-11 2020-08-25 2020-12-31 Social Accountability Officer Implementation Engagement Selection Component 4: Project Individual NG-NIMC-PPA-52 / PIU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-06-30 2020-07-09 2020-08-04 2020-08-11 2020-08-25 2020-12-31 Social Safeguard Officer Implementation Engagement Selection NG-NIMC-PPA-53 / PIU: Component 4: Project Individual Under Database and Integration IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-06-30 2020-07-09 2020-08-04 2020-08-11 2020-08-25 2020-12-31 Implementation Architect Engagement Selection Component 4: Project Individual NG-NIMC-PPA-54 / PIU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-06-30 2020-07-10 2020-08-04 2020-08-11 2020-08-25 2020-12-31 Security Architect Implementation Engagement Selection Component 4: Project Individual NG-NIMC-PPA-55 / PIU: Test Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-06-30 2020-07-09 2020-08-04 2020-08-11 2020-08-25 2020-12-31 and Assurance Architect Implementation Engagement Selection Component 4: Project Individual NG-NIMC-PPA-56 / PIU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-06-30 2020-07-22 2020-08-04 2020-08-11 2020-08-25 2020-12-31 Software Engineer Implementation Engagement Selection Page 3 NG-NIMC-PPA-43 / PIU: Component 4: Project Individual Under Operations Architect/Change IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-07-13 2020-07-21 2020-08-17 2020-08-24 2020-09-07 2020-12-31 Implementation Manager Engagement Selection Component 4: Project Individual NIMC-PPA-06 / NIMC PIU: IDA / V2290 Management and Stakeholder Prior Consultant Limited 30,000.00 0.00 Canceled 2019-07-22 2019-07-17 2019-07-27 2019-08-16 2019-08-03 2019-08-24 2020-02-23 Procurement Officer Engagement Selection Component 4: Project Individual NG-NIMC-PPA-58 / PIU: M & Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-07-20 2020-07-21 2020-08-17 2020-08-24 2020-09-21 2021-09-21 E Specialist (Statistician) Implementation Engagement Selection Component 4: Project Individual NIMC-PPA-02 / NIMC PIU: IDA / V2290 Management and Stakeholder Post Consultant Limited 40,000.00 0.00 Canceled 2019-07-22 2020-07-09 2019-07-27 2019-08-03 2019-08-17 2020-02-16 Technical Lead Engagement Selection Component 4: Project Individual NIMC-PPA-03 / NIMC PIU: IDA / V2290 Management and Stakeholder Post Consultant Limited 40,000.00 0.00 Canceled 2019-07-22 2019-08-28 2019-07-27 2019-08-03 2019-08-17 2020-02-16 Senior M&E Specialist Engagement Selection NIMC-PPA-08 / NIMC PIU: Component 4: Project Individual Internal Communications IDA / V2290 Management and Stakeholder Post Consultant Limited 30,000.00 0.00 Canceled 2019-07-22 2020-07-09 2019-08-17 2019-08-24 2019-09-07 2020-03-08 Officer Engagement Selection Component 4: Project Individual NG-NIMC-PPA-59 / PIU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 40,000.00 0.00 2020-07-20 2020-07-21 2020-08-17 2020-08-24 2020-09-21 2021-09-21 Technical Lead Implementation Engagement Selection NG-NIMC-PPA-60 / PIU: Component 4: Project Individual Under Internal Communication IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-07-20 2020-07-21 2020-08-17 2020-08-24 2020-09-21 2021-09-21 Implementation Officer Engagement Selection Component 4: Project Individual NG-NIMC-PPA-61 / PIU: Under IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 2020-07-20 2020-07-21 2020-08-17 2020-08-24 2020-09-21 2021-09-21 Grievance Redress Manager Implementation Engagement Selection NG-NIMC-PPA-49 / Review Component 4: Project Individual and Business Analysis of Under IDA / V2290 Management and Stakeholder Post Consultant Limited 25,000.00 0.00 2020-07-20 2020-08-07 2020-07-25 2020-09-24 2020-08-08 2020-09-05 2020-12-04 Concept of Self-Enrolment in Implementation Engagement Selection the midst of COVID19 NG-NIMC-PIU-62 / Component 4: Project Individual Coordinator for the Ecosystem Under IDA / V2290 Management and Stakeholder Post Consultant Open 40,000.00 0.00 2020-07-24 2020-07-21 2020-08-21 2020-08-28 2020-09-18 2021-09-18 Coordinating Strategic Unit Implementation Engagement Selection (ESCU) NIMC-PPA-26 / Consultant to Component 4: Project Individual design the project Grievance IDA / V2290 Management and Stakeholder Post Consultant Limited 42,000.00 0.00 Canceled 2019-07-22 2019-08-28 2019-07-27 2019-08-17 2019-08-31 2019-12-02 Redress Mechanism Engagement Selection NIMC-PPA-27 / Consultant to Component 4: Project Individual develop a communications IDA / V2290 Management and Stakeholder Post Consultant Limited 50,000.00 0.00 Canceled 2019-07-22 2019-08-28 2019-07-27 2019-08-03 2019-08-17 2019-11-18 strategy Engagement Selection Component 4: Project Individual NG-NIMC-PPA-51 / ECSU: IDA / V2290 Management and Stakeholder Post Consultant Open 30,000.00 0.00 Canceled 2020-06-30 2020-08-04 2020-08-11 2020-08-25 2020-12-31 Procurement Specialist Engagement Selection Page 4 PROCUREMENT PLAN Version 1.7 – Date: June 17, 2021 INSTITUTIONAL STRENGTHENING FOR IMPROVED VILLAGE SERVICE DELIVERY PROJECT A. Project information: Country: Indonesia Borrower: Republic of Indonesia Project ID: P165543 Financing Agreement IBRD Loan 8941-ID Number: Project Implementation Agency(ies): CPMU: Ministry of Home Affairs (MOHA), Directorate General of Village Government Affairs CPIU: Ministry of Home Affairs (MOHA), Directorate General of Village Government Affairs Ministry of Villages, Directorate General of Village Development and Community Empowerment (PPMD) Ministry of National Development Planning/BAPPENAS, Deputy for Regional Development Directorate for the Development of Disadvantaged Regions, Transmigration and Rural Areas B. Key Dates: 1. Procurement Plan: a. Version 1.0 (for Feb 28, 2019 negotiation) Bank’s Approval to this Mar 12, 2019 version: Period covered by this Apr 1, 2019 – December 31, version: 2020 b. Version 1.6 (previous May 18, 2021 version) Bank’s Approval to this May 28, 2021 version: Period covered by this Apr 1, 2019 – December 31, version: 2023 c. Version 1.7 (this version) June 17, 2021 Bank’s Approval to this June 21, 2021 version: Period covered by this Apr 1, 2019 – December 31, version: 2023 d. [next version, if any] [to be updated] 2. General Procurement Mar 26, 2020 Notice: C. Preamble All Procurement under the Project shall be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers of July 2016, revised November 2017 and August 2018, and the provisions of the Procurement Plan and Project Operations Manual and shall take precedence over any national procurement regulations. In accordance with paragraph 5.9 of the Procurement Regulations, the Bank’s online procurement planning and tracking tools i.e. Systematic Tracking and Exchanges in Procurement (STEP) will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. D. Key Provisions The following conditions apply to all procurement activities in this Procurement Plan. The Bank’s procurement prior review thresholds: The identified procurement risk under this Project is ‘Substantial’. Accordingly, all contracts listed in the Procurement Plan that are at or above the thresholds set out below are subject to the Bank’s prior review. All other contracts are subject to the Bank’s ex-post review. Table 1. Applied Prior Review Threshold Type of procurement Procurement Prior Review Thresholds (US$ millions) Works (including turnkey, supply & installation of 10 plant and equipment, and PPP) Goods, Information Technology and Non- 2 consulting Services Consultants: Firms 1 Consultants: Individuals 0.3 The Bank’s approved selection methods thresholds: The following selection method thresholds shall apply for procurement of goods & information technology, non-consulting services and consulting services of each identified activity. Table 2. Applied Approved Selection Method Threshold Type of procurement and Approved Selection Method Thresholds Approved Selection (US$ millions) Method National International Works (including turnkey, supply & installation of plant and equipment, and PPP) (i) Request for Request for at or above $0.2 and at or above $25 Bids (RFB) less than $25 (ii) Request for Quotations less than $0.2 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations Goods, Information Technology and Non-consulting services a. For Goods and Information Technology: (i) Request for Request for at or above $0.1 and at or above $2 Bids (RFB) less than $2 Type of procurement and Approved Selection Method Thresholds Approved Selection (US$ millions) Method National International (ii) Request for Quotations less than $0.1 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations b. For Non-consulting Services: (i) Request for Request for at or above $0.1 and at or above $10 Bids (RFB) less than $10 (ii) Request for Quotations less than $0.1 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations Consultants: firms a. For Selection of Consulting Firms (i) Quality Cost Based Shortlist of firms for at or above $0.4 Selection (QCBS), Fixed contracts below $0.4 Budget Based Selection may comprise (FBS), Least Cost Based entirely national Selection (LCS) and firms Quality Based Selection (QBS) (ii) Consultant’s less than $0.3 N/A Qualifications Based Selection (CQS) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 7.13, 7.14 paragraph 7.13, 7.14 and 7.15 of the and 7.15 of the Procurement Procurement Regulations Regulations b. For Selection of Individual Consultants Type of procurement and Approved Selection Method Thresholds Approved Selection (US$ millions) Method National International (i) Open Competitive All, no monetary All, no monetary Selection of Individual threshold threshold Consultants and Limited Competitive Selection of Individual Consultants (ii) Direct Selection of On exceptional basis On exceptional basis Individual Consultants if justified as per if justified as per paragraph 7.39 of paragraph 7.39 of the Procurement the Procurement Regulations Regulations Standard Procurement Documents (SPD): The Bank’s SPD shall be used when approaching the international market (specifically for international competitive procurement and those contracts shall be as specified in the Procurement Plan tables in STEP. Use of National Procurement Procedures: In accordance with paragraphs 5.3 of the Procurement Regulations, when approaching the national market all contracts to be procured through open national competitive procurement will follow the GoI’s procurement regulation. The procedures applicable to the procurement of goods and non-consulting services awarded on the basis of open national competitive procurement shall be those of the Tender method as set forth in the Peraturan Presiden No. 16/2018 and its subsequent amendment Peraturan Presiden No. 12/2021) provided that such arrangements continue to meet requirements set forth under paragraph 5.4 of these Regulations and the following conditions: 1. The procurement is open to eligible firms from any country. There shall not any restriction to the bidders’ participation including mandatory requirement to form in joint venture; 2. Any gaps between National Procurement Procedures and the Procurement Regulations will be addressed and incorporated in the harmonized bidding documents acceptable by the Bank. Use of National e-Procurement System (SPSE): Unless informed otherwise by the Bank in writing, SPSE e-procurement system may be used only for procurement of works, goods and non-consulting services under Request for Bids (RFB) method through national open competitive procurement method, applying the harmonized model bidding documents for national open competitive procurement agreed by the Bank. For selection of consulting services through QCBS method, only the modified SPSE (termed by LKPP as SPSE-“ICB”) may be used applying the Bank’s Standard Request for Proposal (RFP) document. The Bank has further accepted GOI’s proposal for use of SPSE-ICB for selection of consulting services through CQS method applying a modified Bank’s Standard RFP. Two consulting services activities (contracts) under other Bank-financed project are being performed as pilot use of SPSE-ICB for CQS method to ensure that the system is working as intended. Since at the present time LKPP has not yet developed the modified SPSE for procurement of goods, works and non-consulting services under international open Competitive method, nor for selection of consulting services under QBS, LCS, FBS, and individual consultant selection methods, therefore procurement of all contract packages under these methods shall be carried out through non- electronic process with manual issuance of specific procurement notice (request for expression of interest or invitation for bids/proposals and receipt of bids/proposals), until such time that the modified SPSE has been completed by LKPP and assessed by the Bank to be acceptable. If the Bank determines the modified SPSE to be acceptable for use under the above- mentioned remaining procurement methods, the Bank will confirm through the Bank’s written no objection to LKPP and will also notify in writing to CMPU/CPIUs. Use of National e-Catalogue System. Based on the Bank’s assessment of the national e-catalogue system, the Bank allows the Project Implementing Units (PIUs) under World Bank financed projects to use the national e- catalogue for procurement of small value of goods in lieu of the Request for Quotations (RFQ) method specified in these Regulations within the parameters as below: a) For Goods (other than medicines) with estimated cost not more than USD 15,000 equivalent per contract. PIUs may use the national e-catalogue for procuring such items of goods within the above-specified threshold, if such goods are required under the project and specified in the Procurement Plan approved by the Bank. b) Goods (other than medicines) with estimated cost greater than USD 15,000 but less than USD 100,000 equivalent per contract. PIUs may use the national e-catalogue for procuring such items of goods if such goods are required under the project subject to fulfilling the following additional procedural requirement as below: PIU shall carry out a secondary procurement process through mini competition, by comparing the prices of similar goods offered by at least three different suppliers which available in the national e-catalogue and then selecting the Supplier with the lowest evaluated price on the basis of “as delivered" price at final destination (i.e., including inland transportation, insurance, applicable taxes and any other incidental charges for the delivery of the required quantity of goods at final destination). E. Other Relevant Procurement Information • Project Operations Manual (POM) shall set out the operating procedures for procurement and contract implementation matters under the Project written in Bahasa, which shall be consistent with the procedures and rules specified under the Bank’s Procurement Regulations. In case of any difference of interpretation between the POM and the Bank’s Procurement Regulations, the later shall prevail; • CPMU and CPIUs may use its own forms of contract for goods/non- consulting services procured under Request for Quotations (RFQ) method when approaching to national market, acceptable to the Bank; • Advance procurement may be applied under the project and shall be valid by signing of the Loan Agreement. CPMU and CPIUs may commence the procurement process prior to issuance of the DIPA for any anticipated activity to be procured under the Project, while signing of the contract shall be subject to issuance of the DIPA of the respective activity. All contracts shall not be designed as single-year contract, and therefore procurement process shall continue throughout multiple calendar years without limitation of contract period up to end of the GoI’s fiscal year; • Regardless of the Bank’s review requirement (prior or post), the Bank may review technical aspects of procurement documents and other non- procurement matters (terms of reference, statement of works, technical specifications, environmental documents, cost estimate, etc.) related to the procurement activity in question, if needed; • The Bank will continue to provide guidance and support to the CPMUs, and CPIUs for procurement processing through the STEP. • Project Implementation Support Personnel as defined in the PPSD shall not be included in this Procurement Plan. Their selection and hiring procedures shall continue to apply the GoI’s selection and hiring procedures as further defined in the POM. The Procurement Plan is a living document and can be revised if there are any changes during the implementation of the project. PROCUREMENT Indonesia : Institutional Strengthening for Improved Village Service Delivery PLAN General Information Country: Indonesia Bank’s Approval Date of the Original Procurement Plan: 2020-05-07 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165543 GPN Date: 2020-03-26 Project Name: Institutional Strengthening for Improved Village Service Delivery Loan / Credit No: IBRD / 89410 D Executing Agency(ies): G PPMD, KEMENDES WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-PPMD-190471-GO-RFB / Pengadaan Server Storage dan Virtualisasi, Firewall, Link Promoting Participatory Single Stage - One IBRD / 89410 Post Request for Bids Open - National 1,033,000.00 973,400.83 Completed 2020-09-01 2020-09-21 2020-09-04 2020-09-25 2020-10-13 2020-10-02 2020-10-16 2020-10-14 2020-11-06 2020-12-28 2020-12-23 Controller, DNS Server serta Village Development Envelope Revitalisasi Jaringan Campus LAN Gedung Utama ID-PPMD-190499-GO-RFQ / Pengadaan Infrastruktur Promoting Participatory Request for Single Stage - One IBRD / 89410 Post Limited 97,500.00 98,051.77 Completed 2020-09-06 2020-09-29 2020-10-12 2020-11-03 2020-11-11 2020-12-15 Ruang Kendali dan Media Village Development Quotations Envelope Center ID-PPMD-203501-NC-RFQ / Printing and Distribution of P3PD Support Guidelines Pending Promoting Participatory Request for Single Stage - One Subcomponent 2B: IBRD / 89410 Post Limited 14,145.00 0.00 Implementati 2020-11-13 2020-11-20 2020-12-20 Village Development Quotations Envelope Community Capacity Building on and Social Accountability Systems NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-PPMD-169353-NC-RFB / Administrative Services Firm (ASF) for Managing Contracts Promoting Participatory Single Stage - One IBRD / 89410 Prior Request for Bids Open - National 4,000,000.00 3,535,875.79 Signed 2020-05-11 2020-05-18 2020-05-16 2020-06-06 2020-08-19 2020-07-06 2021-01-20 2020-08-10 2021-02-24 2024-12-17 of Technical Assistance Village Development Envelope Supports for MOV under Component 2 ID-PPMD-203511-NC-RFQ / Preparation of Policy Promoting Participatory Request for Single Stage - One Documents and Socialization IBRD / 89410 Post Limited 73,741.00 72,865.12 Completed 2020-11-12 2020-11-05 2020-11-19 2020-11-20 2020-12-31 2020-12-21 Village Development Quotations Envelope Materials of P3PD Subcomponent 2B ID-PPMD-203859-NC-RFQ / Workshop for Regulation Promoting Participatory Request for Single Stage - One IBRD / 89410 Post Limited 30,000.00 27,158.30 Signed 2020-11-12 2020-11-19 2020-11-19 2020-12-08 2020-12-31 Harmonization of Sub- Village Development Quotations Envelope Component 2A-P3PD PIU PMD ID-PPMD-234734-NC-RFB / Strengthening Capacity of Pending Promoting Participatory Single Stage - One Tenaga Pendamping IBRD / 89410 Prior Request for Bids Open - National 2,750,000.00 0.00 Implementati 2021-05-17 2021-05-24 2021-06-07 2021-06-21 2021-07-08 2021-11-05 Village Development Envelope Profesional (TPP) P3PD Project on Fiscal Year 2021 ID-PPMD-234735-NC-RFB / Preparation of P3PD Learning Under Promoting Participatory Single Stage - One Materials Subcomponent 2b IBRD / 89410 Post Request for Bids Open - National 365,000.00 0.00 Implementati 2021-05-17 2021-05-31 2021-05-24 2021-06-03 2021-06-10 2021-06-21 2021-10-19 Village Development Envelope and Women's Leadership on Workshop ID-PPMD-234757-NC-RFB / Technical Guidance for Pending Inclusive Village P3PD and Promoting Participatory Single Stage - One IBRD / 89410 Post Request for Bids Open - National 850,000.00 0.00 Implementati 2021-05-17 2021-05-24 2021-06-03 2021-06-11 2021-06-21 2021-11-28 Tryout of Social Accountability Village Development Envelope on Implementation in P3PD Village CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-PPMD-187415-CS-QCBS / Consultant services for NGO Promoting Participatory Quality And Cost- IBRD / 89410 Prior Open - International 3,882,000.00 0.00 Canceled 2020-08-12 2020-10-19 2020-09-02 2020-09-23 2020-10-21 2020-11-04 2020-12-09 2021-01-04 2024-12-24 Village Community Capacity Village Development Based Selection Development Region I ID-PPMD-187419-CS-QCBS / Consultant services for NGO Promoting Participatory Quality And Cost- IBRD / 89410 Prior Open - International 4,327,000.00 0.00 Canceled 2020-08-12 2020-10-19 2020-09-02 2020-09-23 2020-10-21 2020-11-04 2020-12-09 2021-01-04 2024-12-24 Village Community Capacity Village Development Based Selection Development Region II Page 1 ID-PPMD-187423-CS-QCBS / Consultant services for NGO Promoting Participatory Quality And Cost- IBRD / 89410 Prior Open - International 4,436,000.00 0.00 Canceled 2020-08-12 2020-10-19 2020-09-02 2020-09-23 2020-10-21 2020-11-04 2020-12-09 2021-01-04 2024-12-24 Village Community Capacity Village Development Based Selection Development Region III ID-PPMD-240060-CS-QCBS / Community Capacity Development And Social Promoting Participatory Quality And Cost- Accountability Systems IBRD / 89410 Prior Open - International 2,067,500.00 0.00 Under Review 2021-06-21 2021-07-12 2021-08-10 2021-09-07 2021-10-07 2021-11-25 2021-12-27 2024-12-10 Village Development Based Selection Through Digital Platforms (Non-Government Organization) Western Region ID-PPMD-240069-CS-QCBS / Community Capacity Development And Social Promoting Participatory Quality And Cost- Accountability Systems IBRD / 89410 Prior Open - International 2,275,500.00 0.00 Under Review 2021-06-21 2021-07-12 2021-08-10 2021-09-07 2021-10-07 2021-11-25 2021-12-27 2024-12-10 Village Development Based Selection Through Digital Platforms (Non-Government Organization) middle Region ID-PPMD-240074-CS-QCBS / Community Capacity Development And Social Promoting Participatory Quality And Cost- Accountability Systems IBRD / 89410 Prior Open - International 2,340,500.00 0.00 Under Review 2021-06-21 2021-07-12 2021-08-10 2021-09-07 2021-10-07 2021-11-25 2021-12-27 2024-12-10 Village Development Based Selection Through Digital Platforms (Non-Government Organization) Eastern Region INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-PPMD-203715-CS-INDV / Procurement of Individual Individual Consultant for Participatory Promoting Participatory Pending IBRD / 89410 Post Consultant Limited 2,840.00 0.00 2020-11-09 2020-11-11 2020-11-13 2020-11-17 2021-01-16 Planning, Inclusion and Social Village Development Implementation Selection Accountability for the P3PD Program, Subcomponent 2B Page 2 PROCUREMENT PLAN (Textual Part) Project information: Support to Enterprise Development and Competitiveness Project (P161590) Project Implementation agency: PADEC Date of the Procurement Plan: Août 2018 Period covered by this Procurement Plan: PPA Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. “Not Applicable” PROCUREMENT Congo, Republic of : Support to Enterprise Development and Competitiveness Project PLAN General Information Country: Congo, Republic of Bank’s Approval Date of the Original Procurement Plan: 2018-11-07 2021-05-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161590 GPN Date: 2019-08-22 Project Name: Support to Enterprise Development and Competitiveness Project Loan / Credit No: IBRD / P4920, IBRD / 88710 C Executing Agency(ies): G-Support to Economic Diversification WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-PADEC-014-F-DPX-18- MOBILIERS DE BUREA / Project implementation and Request for Single Stage - One IBRD / P4920 Post Open - National 60,000.00 49,602.94 Completed 2018-09-21 2018-11-16 2019-04-09 2019-05-15 2019-04-25 Acquisition de mobilier de coordination Quotations Envelope bureau pour l'UGP du PADEC CG-PADEC-015-F-DPX-18- ORDINATEURS UGP / Project implementation and Request for Single Stage - One Acquisition matériels IBRD / P4920 Post Open - National 70,000.00 58,873.14 Completed 2018-09-11 2018-11-06 2018-12-17 2019-05-05 2019-01-16 coordination Quotations Envelope informatiques et de reprographie pour l'UGP CG-PADEC-016-F-DPX-18- ACQUISITION VEHICU / Project implementation and Request for Single Stage - One IBRD / P4920 Post Open - National 280,000.00 259,904.73 Completed 2018-09-08 2018-11-03 2018-12-17 2019-05-02 2019-01-16 Acquisition des véhicules pour coordination Quotations Envelope le Projet CG-PADEC-017-F-SED-18- TOM2PRO / Acquisition et Project implementation and IBRD / P4920 Post Direct Selection Direct 41,000.00 33,334.13 Completed 2018-10-05 2018-11-21 2018-10-10 2018-11-21 2018-11-14 2018-12-17 2019-05-13 2019-01-16 installation du logiciel coordination TOM²PRO CG-PADEC-035-F- FOURNITURES-19 / VEHICULES UNITES OP- Acquisition de 03 véhicules Regulatory and institutional POUR LES Unites support to strenghten the Request for Single Stage - One IBRD / P4920 Post Open - National 228,000.00 148,247.24 Completed 2019-03-12 2019-05-07 2019-05-06 2019-11-03 2019-05-21 operationnelles du PADEC enabling environment for Quotations Envelope (FADPME CPA et COMITE DE private sector development CONCERTATION ENTRE LES ADMINISTRATIONS ET LE SECTEUR PRIVE) CG-PADEC-036-F- FOURNITURES-19 / EQUIP- UNIT- OP- Acquisition Regulatory and institutional matériel et équipement support to strenghten the Request for Single Stage - One informatique pour le FADPME IBRD / P4920 Post Open - National 70,000.00 53,119.37 Completed 2019-04-03 2019-05-29 2019-11-29 2019-11-25 2019-12-21 enabling environment for Quotations Envelope CPA et COMITE DE private sector development CONCERTATION entre les administrations et le secteur prive CG-PADEC-037-F FOURNITURES-19 / MOB UNIT- OP- Acquisition de mobilier Regulatory and institutional de bureau pour les UNites support to strenghten the Request for Single Stage - One operationnelles du PADEC IBRD / P4920 Post Open - National 60,000.00 28,139.28 Completed 2019-03-26 2019-05-21 2019-12-10 2019-11-17 2020-01-24 enabling environment for Quotations Envelope (FADPME, CPA, COMITE DE private sector development CONCERTATION ENTRE LES ADMINISTRATIONS ET LE SECTEUR PRIVE) CG-PADEC-035-F- FOURNITURES-19 / LOGICIEL SUIV EVAL- Acquisition du Project implementation and IBRD / P4920 Post Direct Selection Direct 40,000.00 0.00 Canceled 2019-10-30 2021-05-12 2019-11-04 2019-12-09 2020-06-06 Logiciel de traitement de coordination l'information de suivi- évaluation TOM²PRO CG-PADEC-075-SAC-AC-20 / AC-FOURNITURE DE BUREAU- SELECTION D'UN PRESTATAIRE EN VUE D'UN ACCORD CADRE Under Project implementation and Request for Single Stage - One POUR LA FOURNITURE DES IBRD / P4920 Post Open - National 33,000.00 0.00 Implementati 2020-03-21 2020-05-16 2020-11-12 coordination Quotations Envelope CONSOMMABLES on INFORMATIQUES ET FOURNITURES DE BUREAU DU PADEC CG-PADEC-079-F- FOURNITURES-20 / VEHICULE DE L'ADPME- ACQUISITION Direct support to MSMEs to D'UN VEHICULE DE TYPE 4X4 enhance the development Request for Single Stage - One IBRD / 88710 Post Open - National 90,000.00 72,274.81 Signed 2020-11-04 2020-12-30 2021-03-23 2021-06-28 POUR L'AGENCE DE and competitiveness of Quotations Envelope DEVELOPPEMENT DES PETITES selected value chains ET MOYENNES ENTREPRISES (ADPME) CG-PADEC-078-F- FOURNITURES-20 / EQUIP- ADPME- Acquisition et livraison du matériel et Direct support to MSMEs to équipement informatique enhance the development Request for Single Stage - One IBRD / 88710 Post Limited 59,973.00 75,884.19 Signed 2020-12-02 2021-02-05 2021-01-27 2021-03-23 2021-07-26 pour la Direction générale et and competitiveness of Quotations Envelope les directions selected value chains départementales du Kouilou, du Niari, de la Cuvette et de la Sangha de l'ADPME Page 1 CG-PADEC-081-F- FOURNITURES-20 / Mobilier de bureau- ADPME- Acquisition, installation et Direct support to MSMEs to livraison de mobilier de enhance the development Request for Single Stage - One IBRD / 88710 Post Limited 77,905.00 53,628.75 Signed 2020-12-15 2021-02-05 2021-02-09 2021-03-23 2021-08-08 bureau pour la Direction and competitiveness of Quotations Envelope générale et les directions selected value chains départementales du Kouilou, du Niari, de la Cuvette et de la Sangha de l'ADPME CG-PADEC-084-F-DC-21 / ACQUISITION DE TABLETTES POUR ODK- Acquisition de 55 Under Project implementation and Request for Single Stage - One tablettes pour la collecte IBRD / 88710 Post Limited 36,000.00 0.00 Implementati 2021-04-27 2021-06-22 2021-12-19 coordination Quotations Envelope digitale des données à on distance via l'application ODK Collect CG-PADEC-087- FOURNITURES-RFQ-21 / VEHICULE DE L'APPDZES- ACQUISITION D'UN VEHICULE Regulatory and institutional Pending DE TYPE 4X4 POUR L'AGENCE support to strenghten the Request for Single Stage - One IBRD / 88710 Post Limited 74,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 DE PLANIFICATION DE enabling environment for Quotations Envelope on PROMOTION ET DE private sector development DEVELOPPEMENT DES ZONES ECONOMIQUES SPECIALES (APPDZES) CG-PADEC-088- FOURNITURES-RFQ-21 / EQUIP INFORM APPDZES- ACQUISITION DU MATÉRIEL ET Regulatory and institutional EQUIPEMENT INFORMATIQUE Under support to strenghten the Request for Single Stage - One POUR L'AGENCE DE IBRD / 88710 Post Limited 33,250.00 0.00 Implementati 2021-06-22 2021-08-17 2022-02-13 enabling environment for Quotations Envelope PLANIFICATION, DE on private sector development PROMOTION ET DE DÉVELOPPEMENT DES ZONES ECONOMIQUES SPÉCIALES (APPDZES) CG-PADEC-089- FOURNITURES-RFQ-21 / MOBILIER APPDZES- ACQUISITION DU MOBILIER DE Regulatory and institutional Pending BUREAU POUR L'AGENCE DE support to strenghten the Request for Single Stage - One IBRD / 88710 Post Limited 30,000.00 0.00 Implementati 2021-06-30 2021-08-25 2022-02-21 PLANIFICATION, DE enabling environment for Quotations Envelope on PROMOTION ET DE private sector development DÉVELOPPEMENT DES ZONES ECONOMIQUES SPÉCIALES (APPDZES) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-PADEC-051-SAC-19 / GARDIENNAGE CONCERTATION-Recrutement Regulatory and institutional Under dune societe chargee des support to strenghten the Request for Single Stage - One IBRD / P4920 Post Limited 4,080.00 0.00 Implementati 2019-07-02 2019-08-27 2020-02-23 services de gardiennage au enabling environment for Quotations Envelope on Comite de Concertation entre private sector development les administrations publiques et le secteur prive CG-PADEC-053-SAC-19 / NETTOYAGE CONCERTATION- Recrutement dune societe Regulatory and institutional Under chargee de lentretien des support to strenghten the Request for Single Stage - One IBRD / P4920 Post Limited 4,800.00 0.00 Implementati 2019-07-17 2019-09-11 2020-03-09 locaux du Comite de enabling environment for Quotations Envelope on Concertation entre les private sector development administrations publiques et le secteur prive CG-PADEC-055-SAC-19 / ENTR INFORM- Recrutement d'un prestataire chargé de Project implementation and Request for Single Stage - One IBRD / P4920 Post Limited 15,000.00 12,677.42 Signed 2019-07-05 2019-07-25 2019-08-30 2019-09-23 2020-02-26 l'entretien du matériel coordination Quotations Envelope informatique du Projet (y compris frais de maintenance) CG-PADEC-073-SAC-AC-20 / AC-SUPPORT HORS MEDIA- SELECTION D'UN PRESTATAIRE EN VUE D'UN ACCORD CADRE Project implementation and Request for Single Stage - One POUR LA CONCEPTION ET LA IBRD / P4920 Post Open - National 64,000.00 62,214.60 Signed 2020-03-01 2020-09-28 2020-04-26 2020-02-25 2020-10-23 coordination Quotations Envelope FOURNITURE DES SUPPORTS DE COMMUNICATION HORS MEDIA (FADPME & CPA Y COMPRIS) CG-PADEC-074-SAC-AC-20 / AC-SUPPORT AUDIO VISUEL- SELECTION D'UN PRESTATAIRE EN VUE D'UN ACCORD CADRE Project implementation and Request for Single Stage - One POUR LA CONCEPTION ET LA IBRD / P4920 Post Open - National 16,000.00 14,889.72 Signed 2020-03-01 2020-09-28 2020-04-26 2020-02-25 2020-10-23 coordination Quotations Envelope FOURNITURE DE SUPPORTS DE COMMUNICATION AUDIVISUELLE DU PADEC (FADPME & CPA Y COMPRIS) CG-PADEC-080-SAC-20 / ENTR SPLITS- Recrutement d'un prestataire chargé de Under l'entretien et la maintenance Project implementation and Request for Single Stage - One IBRD / 88710 Post Limited 22,800.00 0.00 Implementati 2020-11-16 2021-01-11 2021-07-10 des splits et groupes coordination Quotations Envelope on électrogènes des sites 1 & 2 du Projet (y compris frais de maintenance) Page 2 CG-PADEC-082-SAC-AC-20 / AC-SUPPORT OUTILS DE VISIBILITE-SELECTION D'UN PRESTATAIRE EN VUE D'UN Project implementation and Request for Single Stage - One ACCORD CADRE POUR LA IBRD / 88710 Post Open - National 24,000.00 22,086.24 Signed 2020-11-05 2020-12-31 2020-08-12 2021-06-29 coordination Quotations Envelope CONCEPTION ET LA FOURNITURE DES OUTILS DE VISIBILITE DU PADEC (FADPME & CPA Y COMPRIS) CG-PADEC-083-SAC-AC-20 / AC-SUPPORT OUTILS DE PRODUCTION AUDIO VISUELLE- SELECTION D'UN PRESTATAIRE EN VUE D'UN ACCORD CADRE Project implementation and Request for Single Stage - One IBRD / 88710 Post Limited 18,000.00 16,564.68 Signed 2020-11-07 2020-07-14 2021-01-02 2020-08-12 2021-07-01 POUR LA CONCEPTION ET LA coordination Quotations Envelope FOURNITURE D'OUTILS DE PRODUCTION AUDIO VISUELLE DU PADEC (FADPME & CPA Y COMPRIS) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-PADEC-001-C-SFQ- 18OBSERV DE TRANSPORT / Recrutement d'une firme pour Regulatory and institutional l'étude de faisabilité de support to strenghten the Quality Based IBRD / P4920 Post Open - National 240,000.00 193,845.94 Completed 2018-09-21 2018-11-23 2018-10-12 2018-11-25 2018-11-23 2018-12-23 2019-10-17 2019-01-22 2019-10-17 2019-02-21 2019-10-17 2019-03-28 2019-05-20 2020-03-27 2020-10-14 l'observatoire de transport enabling environment for Selection multimodal pour le Conseil private sector development Congolais des Chargeurs (CCC) CG-PADEC-002-C-SFQC-18 AUDIT PABPS / Recrutement Regulatory and institutional d'une firme chargée de la support to strenghten the Quality And Cost- réalisation d'un audit des IBRD / P4920 Post Open - National 260,000.00 66,503.45 Completed 2018-09-20 2018-11-23 2018-10-11 2018-11-24 2018-11-23 2018-12-22 2019-10-11 2019-01-21 2019-10-11 2019-02-25 2019-10-15 2019-04-01 2019-05-06 2020-03-31 2019-11-26 enabling environment for Based Selection ressources humaines du Port private sector development Autonome de Brazzaville et Ports secondaires (PABPS) CG-PADEC-003-C-SFQ-18- ETUDE MARCHE ZES / Regulatory and institutional Recrutement d'une firme support to strenghten the Quality Based IBRD / P4920 Post Open - International 220,000.00 200,506.30 Completed 2018-11-08 2019-10-22 2018-11-29 2019-04-24 2019-01-12 2019-09-19 2019-02-09 2019-09-19 2019-03-11 2019-09-19 2019-04-10 2019-10-11 2019-05-15 2019-10-25 2020-05-14 2020-06-26 chargée de l'actualisation de enabling environment for Selection l'étude de faisabilité de la ZES private sector development de Pointe Noire CG-PADEC-005-C-SFQ-18- Regulatory and institutional DIAGNOSTIC GUYOT / support to strenghten the Quality Based Recrutement d'un cabinet de IBRD / P4920 Post Open - International 200,000.00 215,087.40 Completed 2018-09-21 2018-11-23 2018-10-12 2018-11-25 2018-11-23 2018-12-23 2019-10-16 2019-01-22 2019-10-16 2019-02-21 2019-10-16 2019-03-28 2019-06-24 2020-03-27 2020-10-19 enabling environment for Selection consultants pour réaliser private sector development l'étude diagnostique du GUOT CG-PADEC-007-C-SFQ-18- ORGANISATION CPA / Direct support to MSMEs to Recrutement d'une assistance Consultant enhance the development technique pour l'organisation IBRD / P4920 Post Qualification Open - International 320,000.00 284,180.49 Signed 2018-10-15 2019-08-05 2018-11-05 2018-12-19 2019-09-18 2019-01-18 2019-09-18 2019-02-22 2019-07-15 2019-08-21 and competitiveness of et l'opérationnaliser du Selection selected value chains Concours de Plan d'Affaires (CPA) CG-PADEC-008-C-SFQ-18 OPERATIONAL FADPME / Recrutement d'une assistance Direct support to MSMEs to Consultant technique pour la gestion et enhance the development IBRD / P4920 Post Qualification Open - International 360,000.00 418,394.45 Signed 2018-10-09 2019-09-04 2018-10-30 2018-12-13 2019-10-02 2019-01-12 2019-10-18 2019-02-16 2019-09-13 2019-08-15 l'opérationnalisation du and competitiveness of Selection Fonds d'Appui au selected value chains Développement des PME (FADPME) CG-CG-PADEC-011-C-SFQC- 18- PLAN DEMERGEN / Recrutement d'une firme chargé de l'élaboration d'une Direct support to MSMEs to stratégie d'émergence et de enhance the development Quality And Cost- IBRD / P4920 Post Open - International 300,000.00 0.00 Canceled 2018-09-20 2020-01-29 2018-10-11 2018-11-24 2018-12-22 2019-01-21 2019-02-25 2019-04-01 2020-03-31 consolidation des TPE/ PME and competitiveness of Based Selection dans les secteurs du selected value chains Tourisme, du Bois, des Transports Logistiques et de l'agro-industrie CG-PADEC-018-C-SFQC-18- AUDIT DES COMPTES / Recrutement d'un cabinet Project implementation and Quality And Cost- IBRD / P4920 Post Open - National 90,000.00 49,562.03 Signed 2018-11-15 2018-11-13 2018-12-06 2019-01-19 2019-01-29 2019-02-16 2019-09-23 2019-03-18 2019-10-11 2019-04-22 2019-10-14 2019-05-27 2019-05-06 2020-05-26 chargé de réaliser l'audit coordination Based Selection administratif, financier et comptable du PPA-PADEC CG-PADEC-032-C-QC-19 / COMM TEXTES REFORMES- Regulatory and institutional Consultant Recrutement d une firme support to strenghten the Under IBRD / P4920 Post Qualification Open - National 30,000.00 0.00 2019-08-22 2021-06-07 2019-09-12 2019-10-26 2019-11-25 2019-12-30 2020-06-27 chargee de l appui a la enabling environment for Implementation Selection sensibilisation des textes de private sector development reformes CG-PADEC-066-C-SQC-19 / STRATEGIE COMM- Consultant Recrutement d'un cabinet de Project implementation and IBRD / 88710 Post Qualification Open - International 300,000.00 252,919.21 Signed 2019-12-05 2020-10-22 2019-12-26 2020-09-15 2020-02-08 2020-11-20 2020-03-09 2020-12-22 2020-04-13 2021-01-28 2020-10-10 consultant pour l'élaboration coordination Selection de la stratégie de communication du PADEC CG-PADEC-067-C-SQC-19 / APPD-ZES-Recrutement d'un cabinet de consultant chargé d'assister le Ministère des Regulatory and institutional Zones Economiques Spéciales Consultant support to strenghten the dans l'opérationnalisation de IBRD / 88710 Post Qualification Open - International 300,000.00 295,303.46 Signed 2020-02-14 2021-03-16 2020-03-06 2020-10-27 2020-04-19 2021-01-11 2020-05-19 2021-02-24 2020-06-23 2021-03-23 2020-12-20 enabling environment for l'Agence de Planification, de Selection private sector development Promotion et de Développement des Zones Economiques Spéciales (APPD- ZES) Page 3 CG-PADEC-076-C-SFQC-20 / ORGANE DE COORDINATION DES CORRIDORS- Regulatory and institutional RECRUTEMENT D'UN CABINET support to strenghten the Quality And Cost- Under DE CONSULTANTS CHARGE DE IBRD / P4920 Post Open - International 318,000.00 0.00 2020-03-06 2021-06-07 2020-03-27 2020-10-07 2020-05-10 2020-06-07 2020-07-07 2020-08-11 2020-09-15 2021-09-15 enabling environment for Based Selection Implementation METTRE EN PLACE L'ORGANE private sector development DE COORDINATION ET DE RÉGULATION DES CORRIDORS ET DES TRANSPORTS CG-PADEC-077-SAC-AC-20 / ÉVÉNEMENTIELLE- RECRUTEMENT D'UN CABINET DE CONSULTANT CHARGEE DE Regulatory and institutional Consultant L'ORGANISATION DES support to strenghten the IBRD / P4920 Post Qualification Open - International 300,000.00 0.00 Under Review 2020-03-13 2020-11-05 2020-04-03 2020-05-17 2020-06-16 2020-07-21 2021-01-17 JOURNEES DE REFLEXION SUR enabling environment for Selection L'ECOSYSTEME DES STARTUPS private sector development ÉVOLUANT DANS LE NUMÉRIQUE A BRAZZAVILLE ET POINTE NOIRE. CG-PADEC-085-C-SQC-21 / CYBERLEGISLATION- Recrutement d'un cabinet de consultants chargé Regulatory and institutional d'organiser les ateliers de Consultant support to strenghten the sensibilisation et de IBRD / 88710 Post Qualification Open - National 150,000.00 0.00 Under Review 2021-04-19 2021-05-03 2021-05-10 2021-06-23 2021-07-23 2021-08-27 2022-02-23 enabling environment for vulgarisation de la cyber Selection private sector development législation congolaise dans les villes de Brazzaville, Pointe Noire, Dolisie, Owando et Ouesso CG-PADEC-086-C-CQS-21 / FORUM SUR LES ZES- Recrutement d'un cabinet de Regulatory and institutional Consultant consultants chargé de support to strenghten the Pending IBRD / 88710 Post Qualification Open - National 100,000.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 l'organisation sur 03 jours du enabling environment for Implementation Selection Forum sur la Zones private sector development Economique Spéciale (ZES) de Pointe Noire INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-PADEC-004C-ED OMT- 18 VISA TOURISTIQUE / Regulatory and institutional Entente directe avec l'OMT support to strenghten the pour appuyer le Ministère du IBRD / P4920 Post Direct Selection Direct 90,000.00 0.00 Canceled 2018-10-17 2019-03-20 2018-10-27 2018-12-31 2019-06-29 enabling environment for Tourisme et de private sector development l'Environnement dans la création du visa touristique CG-PADEC-006-COMP 03CV- 18-SITES WEB DGI / Appui à la Regulatory and institutional Individual mise en place de 02 sites Web support to strenghten the IBRD / P4920 Post Consultant Limited 6,000.00 0.00 Canceled 2018-10-10 2019-01-14 2018-10-15 2019-01-22 2018-11-05 2019-01-22 2018-12-10 2019-06-08 pour la Direction Générale des enabling environment for Selection Impôt & Direction Générale de private sector development la Construction CG-PADEC-009-C-CI-18- MANUEL DU FADPME / Recrutement d'un Consultant Direct support to MSMEs to Individual individuel pour l'élaboration enhance the development IBRD / P4920 Post Consultant Open 60,000.00 53,721.43 Completed 2018-09-24 2018-11-19 2018-11-12 2018-11-19 2018-12-03 2018-11-19 2019-01-07 2018-11-22 2019-07-06 2018-12-18 du manuel de procédures et and competitiveness of Selection des opérations du Fonds selected value chains d'Appui au Développement des PME (FADPME) CG-PADEC-010-C-CI-18- Direct support to MSMEs to MANUELS CPA / Recrutement Individual enhance the development d'un Consultant individuel IBRD / P4920 Post Consultant Open 60,000.00 51,329.92 Completed 2018-09-17 2018-11-22 2018-11-05 2018-11-22 2018-11-26 2018-12-17 2018-12-31 2018-12-17 2019-06-29 2019-01-16 and competitiveness of pour l'élaboration du manuel Selection selected value chains d'opération du CPA CG-PADEC-012-CI-18- SAUVEGARDE ENVIRONNEM / Individual Project implementation and Recrutement d'un spécialiste IBRD / P4920 Post Consultant Open 51,600.00 46,584.30 Signed 2018-09-06 2018-11-22 2018-10-25 2018-11-15 2018-11-22 2018-12-20 2018-11-22 2019-06-18 coordination en sauvegarde Selection environnementale. CG-PADEC-013-CI-18 SAUVEGARDE SOCIALE / Individual Project implementation and Recrutement un consultant IBRD / P4920 Post Consultant Open 51,600.00 46,584.30 Signed 2018-09-10 2018-11-22 2018-10-29 2018-11-19 2018-11-22 2018-12-24 2018-11-22 2019-06-22 coordination national/ spécialiste en Selection sauvegarde sociale CG-PADEC-019-CI-18- MANUEL DE PROC PADEC / Recrutement d'un Consultant Individual personne physique pour Project implementation and IBRD / P4920 Post Consultant Open 40,000.00 32,157.07 Completed 2018-09-19 2018-11-21 2018-11-07 2018-10-01 2018-11-28 2018-11-21 2019-01-02 2018-11-22 2019-07-01 2018-11-30 l'actualisation du manuel des coordination Selection procédures administratives, financières et comptables du PADEC CG-PADEC-020-CI-18- Individual COMPTABLE PADEC / Project implementation and IBRD / P4920 Post Consultant Open 38,400.00 38,240.84 Signed 2018-09-12 2018-11-22 2018-10-31 2018-11-21 2018-11-22 2018-12-26 2018-11-22 2019-06-24 RECRUTEMENT DU coordination Selection COMPTABLE DU PADEC CG-PADEC-021-CI-19 / Individual SPECIALISTE COMM- Project implementation and IBRD / 88710 Post Consultant Open 51,600.00 45,041.96 Signed 2019-02-15 2019-08-19 2019-04-05 2019-08-19 2019-04-26 2019-08-19 2019-05-31 2019-05-06 2019-11-27 Recrutement du Spécialiste en coordination Selection communication du PADEC CG-PADEC-022-CI-19 / SECRETAIRE PERMANENT- Regulatory and institutional Recrutement du Secrétaire Individual support to strenghten the permanent du Comite de IBRD / P4920 Post Consultant Limited 52,800.00 51,921.73 Signed 2019-03-27 2020-07-09 2019-04-01 2020-02-03 2019-04-22 2020-02-28 2019-05-27 2020-02-28 2019-11-23 enabling environment for Concertation entre les Selection private sector development administrations et le secteur prive Page 4 CG-PADEC-023-CI-19 / SP ADJOINT DU DPP-Recrutement Regulatory and institutional du Secretaire permanent Individual support to strenghten the adjoint du Comite de IBRD / P4920 Post Consultant Limited 48,000.00 47,740.12 Signed 2019-03-29 2020-07-09 2019-04-03 2020-01-22 2019-04-24 2020-01-28 2019-05-29 2020-02-28 2019-11-25 enabling environment for Concertation entre les Selection private sector development administrations et le secteur prive CG-PADEC-026-C-CI-19 / COMPT-CONCERTATION- Regulatory and institutional Recrutement d un Comptable Individual support to strenghten the Under pour le Comite de IBRD / P4920 Post Consultant Open 33,600.00 0.00 2019-03-20 2021-06-09 2019-05-08 2019-05-29 2019-07-03 2019-12-30 enabling environment for Implementation Concertation entre les Selection private sector development administrations et le secteur prive CG-PADEC-027-C- COMPARAISON DE 03 CV-19 / SECRETAIRE CONCERTATION- Regulatory and institutional Individual Recrutement dune secretaire support to strenghten the Under IBRD / P4920 Post Consultant Limited 13,200.00 0.00 2019-04-18 2021-06-21 2019-04-23 2019-05-14 2019-06-18 2019-12-15 pour le Comite de enabling environment for Implementation Selection Concertation entre les private sector development administrations et le secteur prive CG-PADEC-028-CI- COMPRAISON DE 03 CV-19 / PLANTON CONCERTATION- Regulatory and institutional Individual Recrutement d un Planton support to strenghten the Under IBRD / P4920 Post Consultant Limited 4,800.00 0.00 2019-03-27 2021-06-21 2019-04-01 2019-04-22 2019-05-27 2019-11-23 pour le Comite de enabling environment for Implementation Selection Concertation entre les private sector development administrations et le secteur prive CG-PADEC-029-CI- COMPARAISON DE 03 CV-19 / CHAUFFEUR CONCERTATION- Regulatory and institutional Individual recrutement d un Chauffeur support to strenghten the IBRD / P4920 Post Consultant Limited 8,400.00 8,720.87 Signed 2019-03-22 2020-01-27 2019-03-27 2019-11-18 2019-04-17 2019-12-13 2019-05-22 2019-12-26 2019-11-18 pour le Comite de enabling environment for Selection Concertation entre les private sector development administrations et le secteur prive CG-PADEC-030-CI- COMPARAISON-03-CV-19 / NETTOYAGE CONCERTATION- Regulatory and institutional Individual Recrutement d'un individu support to strenghten the IBRD / P4920 Post Consultant Limited 4,800.00 0.00 Canceled 2019-04-17 2019-04-22 2019-05-13 2019-06-17 2019-12-14 pour l entretien des bureaux enabling environment for Selection du Comite de Concertation private sector development entre les administrations et le secteur prive CG-PADEC-031-CI- COMPARAISON-CV-19 / GARDIENNAGE Regulatory and institutional CONCERTATION--Selection d Individual support to strenghten the un premier individu pour IBRD / P4920 Post Consultant Limited 4,080.00 0.00 Canceled 2019-04-17 2019-04-22 2019-05-13 2019-06-17 2019-12-14 enabling environment for assurer la securite du siege du Selection private sector development Comite de Concertation entre les administrations et le secteur prive CG-PADEC-033-C-CI-19 / ETUDE DE REFERENCE- Individual Project implementation and Recrutement d un consultant IBRD / P4920 Post Consultant Open 60,000.00 104,441.81 Completed 2019-04-08 2019-09-17 2019-05-27 2019-10-17 2019-06-17 2019-10-17 2019-07-22 2019-08-05 2020-01-18 2020-03-25 coordination individuel charge de realiser l Selection etude de reference du PADEC CG-PADEC-034-C-CI-19 / MANUEL SUIVI EVAL- Individual Recrutement d un consultant Project implementation and IBRD / P4920 Post Consultant Open 60,000.00 48,812.40 Completed 2019-04-15 2019-10-29 2019-06-03 2019-10-30 2019-06-24 2019-10-30 2019-07-29 2019-09-26 2020-01-25 2019-12-31 individuel charge de realiser la coordination Selection manuel de suivi evaluation du Projet PADEC CG-PADEC-038-C-CI-19 / Individual ASSIST PM- Recrutement d'un Project implementation and IBRD / P4920 Post Consultant Open 33,600.00 25,882.32 Signed 2019-04-30 2019-09-17 2019-06-18 2019-09-18 2019-07-09 2019-09-18 2019-08-13 2019-08-01 2020-02-09 Assistant en passation de coordination Selection marchés pour le PADEC CG-PADEC-039-CI- COMPARAISON-03 CV-19 / SECURITE CONCERTATION-- Regulatory and institutional Selection d un deuxieme Individual support to strenghten the individu pour assurer la IBRD / P4920 Post Consultant Limited 4,080.00 0.00 Canceled 2019-04-17 2019-04-22 2019-05-13 2019-06-17 2019-12-14 enabling environment for securite du siege du Comite Selection private sector development de Concertation entre les administrations et le secteur prive CG-PADEC-041-CI- COMPARAISON 03CV-19 / CONSUL INT PLANIFICATION /recrutement d'un consultant Individual Project implementation and en planification stratégique IBRD / P4920 Post Consultant Limited 40,000.00 0.00 Canceled 2019-04-01 2019-05-27 2019-04-06 2019-04-27 2019-06-01 2019-11-28 coordination pour la mission Selection d'opérationnalisation des programmes de diversification par le secteur privé CG-PADEC-042-CI- COMPARAISON 03CV-19 / CONS INT INFORM- Recrutement du consultant en charge de la Individual Project implementation and programmation informatique IBRD / P4920 Post Consultant Limited 32,000.00 0.00 Canceled 2019-04-04 2019-05-27 2019-04-09 2019-04-30 2019-06-04 2019-12-01 coordination en vue de la production du PIV Selection pour la mission d'opérationnalisation des programmes de diversification par le secteur privé Page 5 CG-PADEC-043-CI- COMPARAISON 03CV-19 / CONS INT FINAN-Recrutement Individual d'un consultant en charge du Project implementation and IBRD / P4920 Post Consultant Limited 32,000.00 0.00 Canceled 2019-04-09 2019-05-27 2019-04-14 2019-05-05 2019-06-09 2019-12-06 financement du secteur privé coordination Selection pour la mission d'opérationnalisation du PND par le secteur privé CG-PADEC-044-CI- COMPARAISON 03CV-19 / CONS NAT INDUS- Recrutement d'un consultant Individual Project implementation and en charge du secteur IBRD / P4920 Post Consultant Limited 24,000.00 0.00 Canceled 2019-04-15 2019-05-27 2019-04-20 2019-05-11 2019-06-15 2019-12-12 coordination industriel pour la mission Selection d'opérationnalisation des programmes de diversification par le secteur privé CG-PADEC-045-CI- COMPARAISON 03CV-19 / CONS NAT TOURISME- Recrutement d'un consultant Individual Project implementation and en charge du secteur IBRD / P4920 Post Consultant Limited 24,000.00 0.00 Canceled 2019-04-17 2019-05-27 2019-04-22 2019-05-13 2019-06-17 2019-12-14 coordination touristique pour la mission Selection d'opérationnalisation des programmes de diversification par le secteur privé CG-PADEC-046-CI- COMPARAISON 03 CV-19 / CONS NAT AGRI-Recrutement d'un consultant en charge du Individual Project implementation and secteur agricole pour la IBRD / P4920 Post Consultant Limited 24,000.00 0.00 Canceled 2019-04-18 2019-05-27 2019-04-23 2019-05-14 2019-06-18 2019-12-15 coordination mission d'opérationnalisation Selection des programmes de diversification par le secteur privé CG-PADEC-047-CI- COMPARAISON 03CV-19 / CONS NAT PROGR- Recrutement d'un consultant Individual national en programmation Project implementation and IBRD / P4920 Post Consultant Limited 24,000.00 0.00 Canceled 2019-04-22 2019-05-27 2019-04-27 2019-05-18 2019-06-22 2019-12-19 des investissements privés coordination Selection (PIV) pour la mission d'opérationnalisation des programmes de diversification par le secteur privé CG-PADEC-048-CI- COMPARAISON 03CV-19 / CONS NAT COMM- Recrutement d'un consultant Individual national chargé d'élaborer et Project implementation and IBRD / P4920 Post Consultant Limited 12,000,000.00 0.00 Canceled 2019-04-24 2019-03-04 2019-04-29 2019-05-20 2019-06-24 2019-12-21 de mettre en œuvre la coordination Selection stratégie et le plan de communication des programmes de diversification par le secteur privé CG-PADEC-049-CI- COMPRAISON 03CV-19 / DescriptionCONS NAT COMM- Recrutement d'un consultant Individual national chargé d'élaborer et Project implementation and IBRD / P4920 Post Consultant Limited 24,000.00 0.00 Canceled 2019-03-28 2019-05-27 2019-04-02 2019-04-23 2019-05-28 2019-11-24 de mettre en œuvre la coordination Selection stratégie et le plan de communication des programmes de diversification par le secteur privé CG-PADEC-025-CI-SED-19 / ASS TECH PRIVE-Entente directe avec Monsieur Felix Regulatory and institutional MOUKO pour apporter une support to strenghten the Under assistance technique au IBRD / P4920 Post Direct Selection Direct 100,000.00 0.00 2019-08-14 2021-06-21 2019-08-24 2019-10-28 2020-04-25 enabling environment for Implementation Comite de Concertation entre private sector development les administrations et le secteur prive-Volet secteur prive CG-PADEC-024-CI-SED-19 / ASSIS TECH PUBLIC-Entente directe avec Monsieur Tertius Regulatory and institutional ZONGO pour apporter une support to strenghten the Under assistance technique au IBRD / P4920 Post Direct Selection Direct 120,000.00 0.00 2019-08-14 2021-06-21 2019-08-24 2019-10-28 2020-04-25 enabling environment for Implementation Comite de Concertation entre private sector development les administrations et le secteur prive-Volet secteur public CG-PADEC-052-CI-COMP CV- 19 / VISA TOURIS- Recrutement dun consultant Regulatory and institutional Individual individuel pour appuyer le support to strenghten the IBRD / P4920 Post Consultant Limited 90,000.00 65,617.93 Completed 2019-06-19 2019-08-19 2019-06-24 2019-08-26 2019-07-15 2019-09-18 2019-08-19 2019-07-09 2020-02-15 2019-12-09 Ministere du Tourisme et de enabling environment for Selection lenvironnement dans la mise private sector development en place dun visa touristique en Republique du Congo CG-PADEC-054-CI-COMP CV- 19 / 05 SITES WEB- Recrutement dun consultant charge de realiser les sites Regulatory and institutional web de la Direction generale Individual support to strenghten the de la construction la direction IBRD / P4920 Post Consultant Limited 44,000.00 33,299.40 Signed 2019-06-30 2019-10-01 2019-07-05 2019-10-01 2019-07-26 2019-10-01 2019-08-30 2019-01-18 2020-02-26 enabling environment for generale des impots de la Selection private sector development Mairie du Port Autonome de Pointe Noire et de ll'Agence pour la création des entreprises (Ex CFE) CG-PADEC-056-CI-SED-19 / CONS INT FINAN-Selection directe de Jean STRAGIER en Individual qualite de consultant en Project implementation and IBRD / 88710 Post Consultant Direct 85,000.00 78,846.00 Completed 2019-07-26 2019-09-23 2019-08-05 2019-09-25 2019-08-26 2019-09-25 2019-09-30 2019-06-28 2020-03-28 2020-07-30 charge du financement du coordination Selection secteur privé pour la mission d'opérationnalisation du PND par le secteur privé Page 6 CG-PADEC-57-CI-SED-19 / CONS INT PLANIFICATION- Selection directe de NCHO Individual OGUIE en qualite de Project implementation and IBRD / 88710 Post Consultant Direct 125,000.00 116,994.00 Completed 2019-07-28 2019-09-23 2019-08-07 2019-09-25 2019-08-28 2019-09-25 2019-10-02 2019-06-28 2020-03-30 2020-07-30 consultant en planification coordination Selection strategique pour la mission d'opérationnalisation du PND par le secteur privé CG-PADEC-058-CI-SED-19 / CONS INT PROGR INFOR- Sélection directe de LOKNA DJAOBELE en qualite de Individual consultant en charge de la Project implementation and IBRD / 88710 Post Consultant Direct 86,000.00 78,438.00 Completed 2019-07-29 2019-09-17 2019-08-08 2019-09-19 2019-08-29 2019-09-19 2019-10-03 2019-06-28 2020-03-31 2020-07-30 programmation informatique coordination Selection en vue de la production du PIV pour la mission d'opérationnalisation du PND par le secteur privé CG-PADEC-059-CI-SED-19 / CONS NAT PROGR INVEST- Selection directe de LlYOD ONDZEKI en qualite de Individual consultant en charge de la Project implementation and IBRD / 88710 Post Consultant Direct 30,000.00 20,548.96 Completed 2019-07-29 2019-09-23 2019-08-08 2019-09-23 2019-08-29 2019-09-24 2019-10-03 2019-07-18 2020-03-31 2020-07-30 programmation des coordination Selection investissements Privés (PIV) pour la mission d'opérationnalisation du PND par le secteur privé CG-PADEC-060-CI-SED-19 / CONS NAT AGRICULTURE- Selection directe de Jacques Individual BOUITY en qualite de Project implementation and IBRD / 88710 Post Consultant Direct 40,000.00 26,120.44 Completed 2019-07-30 2019-09-23 2019-08-09 2019-09-25 2019-08-30 2019-09-25 2019-10-04 2019-06-28 2020-04-01 2020-07-30 consultant en charge du coordination Selection secteur agricole pour la mission d'opérationnalisation du PND par le secteur privé CG-PADEC-061-CI-SED-19 / CONS NAT PLAN COM- Selection directe de Jean Pierre GOMA en qualite de Individual consultant chargé d'élaborer Project implementation and IBRD / 88710 Post Consultant Direct 32,000.00 21,710.50 Completed 2019-07-31 2019-09-23 2019-08-10 2019-09-23 2019-08-31 2019-09-24 2019-10-05 2019-07-18 2020-04-02 2020-07-30 et de mettre en oeuvre la coordination Selection strategie de communication et le plan pour la mission d'opérationnalisation du PND par le secteur privé CG-PADEC-062-CI-SED-19 / CONS NAT SECTEUR INDUST- Selection directe de Sylvestre Individual OSSIALA en qualite de Project implementation and IBRD / 88710 Post Consultant Direct 40,000.00 27,730.78 Completed 2019-07-31 2019-09-17 2019-08-10 2019-09-25 2019-08-31 2019-09-25 2019-10-05 2019-06-28 2020-04-02 2020-07-30 consultant en charge du coordination Selection secteur industriel pour la mission d'opérationnalisation du PND par le secteur privé CG-PADEC-063-CI-SED-19 / CONS NAT SECTEUR TOURIS- Selection directe de Jerome Individual MIKOUIZA en qualite de Project implementation and IBRD / 88710 Post Consultant Direct 35,000.00 27,723.16 Completed 2019-07-26 2019-09-17 2019-08-05 2019-09-23 2019-08-26 2019-09-24 2019-09-30 2019-07-18 2020-03-28 2020-07-30 consultant en charge du coordination Selection secteur touristique pour la mission d'opérationnalisation du PND par le secteur privé CG-PADEC-064-CI- COMPARAISON 03 CV-19 / CHAUFFEUR CPA- Direct support to MSMEs to RECRUTEMENT DUN Individual enhance the development CHAUFFEUR POUR LA FIRME IBRD / 88710 Post Consultant Limited 8,730.00 9,369.31 Signed 2019-10-15 2020-08-31 2019-10-20 2020-09-08 2019-11-10 2020-09-08 2019-12-15 2020-09-08 2020-06-12 and competitiveness of CHARGEE DE Selection selected value chains LOPERATIONNALISATION DU CONCOURS DE PLAN DAFFAIRES (CPA) CG-PADEC-065-CI- COMPARAISON 03 CV-19 / CHAUFFEUR FADPME- RECRUTEMENT DUN Direct support to MSMEs to CHAUFFEUR POUR LE Individual enhance the development PRESTATAIRE CHARGE IBRD / 88710 Post Consultant Limited 8,730.00 9,369.31 Signed 2019-10-15 2020-08-31 2019-10-20 2020-09-04 2019-11-10 2020-09-08 2019-12-15 2020-02-17 2020-06-12 and competitiveness of DOPERATIONNALISER LE Selection selected value chains FONDS DAPPUI AU DEVELOPPEMENT DES PETITES ET MOYENNES ENTREPRISES (FADPME) CG-PADEC-070-CI-19 / RECRUTEMENT D'UN Direct support to MSMEs to ASSISTANT EN SUIVI Individual enhance the development EVALUATION POUR LE IBRD / 88710 Post Consultant Open 19,630.00 0.00 Canceled 2019-12-27 2020-07-09 2020-02-14 2020-03-06 2020-04-10 2020-10-07 and competitiveness of PRESTATAIRE CHARGE Selection selected value chains D'ANIMER LE CONCOURS DE PLAN D'AFFAIRES (CPA) CG-PADEC-069-CI-19 / COMPTABLE CPA- Direct support to MSMEs to RECRUTEMENT D'UN Individual enhance the development COMPTABLE POUR LE IBRD / 88710 Post Consultant Open 17,450.00 0.00 Canceled 2019-12-24 2020-07-09 2020-02-11 2020-03-03 2020-04-07 2020-10-04 and competitiveness of PRESTATAIRE CHARGE Selection selected value chains D'ANIMER LE CONCOURS DE PLAN D'AFFAIRES (CPA) CG-PADEC-071-CI-19 / SITE PADEC-RECRUTEMENT D'UN Individual CONSULTANT INDIVIDUEL Project implementation and Under IBRD / 88710 Post Consultant Open 7,000.00 0.00 2020-02-10 2021-06-21 2020-03-30 2020-10-19 2020-04-20 2020-05-25 2020-11-21 CHARGE DE CONCEVOIR LE coordination Implementation Selection SITE INTERNET DU PADEC ET LA PLATEFORME DU CPA Page 7 CG-PADEC-068-C-SED- ERSUMA-19 / ERSUMA- SÉLECTION DIRECTE DE ERSUMA POUR LA FORMATION Regulatory and institutional DES ACTEURS DU support to strenghten the Under DÉVELOPPEMENT DES IBRD / 88710 Post Direct Selection Direct 250,000.00 0.00 2020-02-11 2021-05-31 2020-02-21 2020-09-29 2020-04-26 2020-10-23 enabling environment for Implementation ENTREPRISES ET DE LA private sector development COMPÉTITIVITÉ EN RÉPUBLIQUE DU CONGO SUR LES ACTES UNIFORMES DE L'OHADA CG-PADEC-072-CI-20 / AUDIT ENVIRONNEMENTAL- Recrutement d’un consultant en vue de l’élaboration d’un Individual Guide d’audit Project implementation and IBRD / P4920 Post Consultant Open 54,000.00 66,332.08 Completed 2020-02-14 2020-07-09 2020-04-03 2020-04-17 2020-04-24 2020-04-23 2020-05-29 2020-04-24 2020-11-25 2020-12-30 environnemental et social des coordination Selection MPME et du renforcement des capacités des spécialistes en sauvegardes dans le cadre de la mise en œuvre du PADEC CG-PADEC-032-C-CI-19 / STRATEGIE API-Recrutement d Regulatory and institutional un consultant individuel pour Individual support to strenghten the l elaboration de l etude IBRD / P4920 Post Consultant Open 100,000.00 0.00 Canceled 2019-08-22 2021-01-06 2019-10-10 2019-10-31 2019-12-05 2020-06-02 enabling environment for strategique de promotion des Selection private sector development investissements assortie d un plan daction CG-PADEC-090-C-CI-21 / REVUE A MI PARCOURS- Individual RECRUTEMENT DU Project implementation and Under IBRD / 88710 Post Consultant Open 70,000.00 0.00 2021-06-15 2021-06-01 2021-08-03 2021-08-24 2021-09-28 2022-03-27 CONSULTANT CHARGE DE coordination Implementation Selection REALISER LA REVUE A MI PARCOUSR DU PADEC. Page 8 Procurement Plan General 1. Project Information Country: KENYA 2. Project Name: Kenya Informal Settlements Improvement Project 2 3. Project ID: P167814 4. Project Implementation Agency: Ministry of Transport and Infrastructure 5. Date of the Procurement Plan: Jan 26,2021 6. Period Covered by this procurement plan: 18 months I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. III. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Public Procurement and Assets Disposal Act, 2015 such arrangements shall be subject to paragraph 5.3 and 5.4 of the Procurement Regulations : When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. IV. Prequalification: Not Applicable 1 V. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable VI. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable VII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable VIII. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Not Applicable IX. Other Relevant Procurement Information Not Applicable 2 X. Threshold for Prior Review, Procurement Approaches and Methods – Good, Works and Non- Consulting Services Procurement Approaches and Methods (US$ millions) Prior Review Category Open Open National Request for (US$ millions) International Quotation (RfQ) Works Goods, IT, and non-consulting services Post Review: All contracts not subject to prior review shall be subject to post review. Summary of the procurement packages for Good, Works and Non-Consulting Services Sr. Contract Estima Revie Market Selection Evaluati Procurem Prequali Domesti Expect Expect No Description ted w by Approac Method on ent fication c ed date ed date Cost Bank h (Open- (RFP, Options Process (Yes/ Prefere of bid/ of (US$) (Prio National/ RFB, (Most (Single No) nce propos Contra r/ Limited RFQ, DS Advanta stage- (Yes/No al ct Post) etc.) etc.) geous single ) openin Signat Bid, envelope g ure BAFO, etc.) Rated Criteria etc.) GOODS 1. 2. 3. 4. Total Goods 613,00 0 WORKS Total works 3 NON-CONSULTING SERVICES Total Non- Consulting Services XI. Thresholds for Prior Review, Selection Approaches and Methods – Consulting Services Category Prior Review Short List of National Consultants (US$ millions) Consulting Engineering and Construction Supervision Services Consultants (Firms) Individual Consultants Note: Consultancy services estimated to cost equivalent to US $ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or regional newspaper. XII. Summary of the procurement packages for Consulting Services Sr. Contract Description Estimat Review Market Selection Shortlisti Expected Expected No ed Cost by Approach Method ng date of bid/ date of (US$) Bank (Open - (QCBS, (Yes/ No) proposal Contract (Prior/ International FBBS, LCBS, opening Signature Post) / National/ QBS, CQS, etc.) DS etc.) 1. 2. 3. 4. 5. 6. 4 7. 8. 9. 10. Total Consulting Services 5 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank- financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub- 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 6 contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 7 Title of the person signing the Letter: 8 PROCUREMENT Kenya : Second Kenya Informal Settlements Improvement Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2021-01-29 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167814 GPN Date: 2021-01-08 Project Name: Second Kenya Informal Settlements Improvement Project Loan / Credit No: IDA / 67590 M Executing Agency(ies): inistry of Transport and Infrastructure WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-214040-CS-QCBS / Consultancy Service for Institutional capacity Quality And Cost- Mapping and Preparation of IDA / 67590 development for slum Post Open - National 1,600,000.00 0.00 Canceled 2021-02-10 2021-03-03 2021-04-16 2021-05-14 2021-06-13 2021-07-18 2021-08-22 2022-08-22 Based Selection National Geodatabase for upgrading Slums/ Informal settlements KE-MOTI-214043-CS-QCBS / Consultancy Service for Institutional capacity Capacity Assessment and Quality And Cost- Pending IDA / 67590 development for slum Post Open - International 300,000.00 0.00 2021-02-14 2021-03-07 2021-04-20 2021-05-18 2021-06-17 2021-07-22 2021-08-26 2022-08-26 Implementation Plan for Based Selection Implementation upgrading Counties and KISIP for Slum Upgrading. KE-MOTI-215295-CS-QCBS / Consultancy Services to undertake Physical Planning, Cadastral Survey and detailed Integrated settlement Quality And Cost- Topographical Survey of 10 IDA / 67590 Post Open - International 1,300,000.00 0.00 Canceled 2021-02-08 2021-05-12 2021-03-01 2021-04-14 2021-05-12 2021-06-11 2021-07-16 2021-08-20 2022-08-20 upgrading Based Selection selected Informal Settlements in Kilifi, Kitui, Makuenei and Taita Taveta Counties Lot V- Cluster 1 KE-MOTI-215297-CS-QCBS / Consultancy Services to undertake Physical Planning, Cadastral survey and detailed Integrated settlement Quality And Cost- IDA / 67590 Post Open - International 1,400,000.00 0.00 Canceled 2021-02-08 2021-05-12 2021-03-01 2021-04-14 2021-05-12 2021-06-11 2021-07-16 2021-08-20 2022-08-20 Topographical Survey of 11 upgrading Based Selection selected informal settlements in Tana River county. Lot V - Cluster 4 KE-MOTI-215299-CS-QCBS / Consultancy Services to undertake Physical Planning, Cadastral Survey and detailed Integrated settlement Quality And Cost- Topographical Survey of 8 IDA / 67590 Post Open - International 1,300,000.00 0.00 Canceled 2021-02-08 2021-05-12 2021-03-01 2021-04-14 2021-05-12 2021-06-11 2021-07-16 2021-08-20 2022-08-20 upgrading Based Selection selected Informal Settlements in Siaya, Homabay, Bungoma, Transzoia and West Pokot Counties Lot V- Cluster 3 KE-MOTI-215300-CS-QCBS / Consultancy Services to undertake Physical Planning, Cadastral Survey and detailed Integrated settlement Quality And Cost- Topographical Survey of 11 IDA / 67590 Post Open - International 1,300,000.00 0.00 Canceled 2021-02-08 2021-05-12 2021-03-01 2021-04-14 2021-05-12 2021-06-11 2021-07-16 2021-08-20 2022-08-20 upgrading Based Selection selected informal settlements in Kiambu, Tharaka Nithi and Machakos Counties. Lot V - Cluster 2 KE-MOTI-214044-CS-QCBS / Consultancy Services for Program management and Quality And Cost- IDA / 67590 Post Open - International 500,000.00 0.00 Under Review 2021-02-17 2021-06-10 2021-03-10 2021-04-23 2021-05-21 2021-06-20 2021-07-25 2021-08-29 2022-08-29 Technical Assistance on an coordination Based Selection Independent Fiduciary Agency KE-MOTI-216645-CS-QCBS / Consultancy Services for Program management and Quality And Cost- IDA / 67590 Post Open - International 1,800,000.00 0.00 Canceled 2021-02-15 2021-03-08 2021-04-21 2021-05-19 2021-06-18 2021-07-23 2021-08-27 2022-08-27 Independent Performance coordination Based Selection Assessment KE-MOTI-214041-CS-QCBS / Consultancy Service for Institutional capacity Quality And Cost- Pending Review and Development of IDA / 67590 development for slum Post Open - International 600,000.00 0.00 2021-02-14 2021-03-07 2021-04-20 2021-05-18 2021-06-17 2021-07-22 2021-08-26 2022-08-26 Based Selection Implementation the National Slum Upgrading upgrading and Prevention Strategies Page 1 KE-MOTI-218292-CS-QCBS / Consultancy Services to Develop Socio-Economic Inclusion Plans, Toolkit for Crime and Violence Prevention Through Environmental Socio-economic inclusion Quality And Cost- Pending IDA / 67590 Prior Open - International 4,000,000.00 0.00 2021-02-21 2021-03-14 2021-04-27 2021-05-25 2021-06-24 2021-07-29 2021-09-02 2022-09-02 Design (CPTED) planning Based Selection Implementation Investments,Strategy and Guidelines of Utilization, Preparation of Mechanism and Guidelines of Community Level KE-MOTI-214793-CS-QCBS / Consultancy Services for Review and repackaging of existing Engineering designs, Procurement Integrated settlement Quality And Cost- Under Documents,Updating RAP & IDA / 67590 Prior Open - International 700,000.00 0.00 2021-02-15 2021-04-22 2021-03-08 2021-04-21 2021-05-19 2021-06-18 2021-07-23 2021-08-27 2022-08-27 upgrading Based Selection Implementation ESIA Reports,and supervision of construction works in informal settlements in Kisumu and Kakamega counties KE-MOTI-214833-CS-QCBS / Consultancy Services for Review and Repackaging of Existing Engieering Integrated settlement Quality And Cost- Under Designs,Procurement IDA / 67590 Prior Open - International 700,000.00 0.00 2021-02-15 2021-04-22 2021-03-08 2021-04-21 2021-05-19 2021-06-18 2021-07-23 2021-08-27 2022-08-27 upgrading Based Selection Implementation Documents,Updating RAPs & ESIA Reports and Supervision of Construction works in the counties of Nairobi & Nakuru KE-MOTI-214831-CS-QCBS / Consultancy Services for Review and Repackaging of existing Engineering Designs, procurement Integrated settlement Quality And Cost- Under IDA / 67590 Prior Open - International 500,000.00 0.00 2021-02-15 2021-04-22 2021-03-08 2021-04-21 2021-05-19 2021-06-18 2021-07-23 2021-08-27 2022-08-27 documents,Updating RAPs & upgrading Based Selection Implementation ESIA Reports and Supervision of Construction works in the counties of Kilifi and Mombasa. KE-MOTI-235017-CS-QCBS / Consultancy Services to undertake Physical Planning, Cadastral survey and detailed Integrated settlement Quality And Cost- IDA / 67590 Prior Open - International 1,400,000.00 0.00 Under Review 2021-05-21 2021-06-11 2021-07-25 2021-08-22 2021-09-21 2021-10-26 2021-11-30 2023-05-24 Topographical Survey of 11 upgrading Based Selection selected informal settlements in Tana River county. Lot V - Cluster 4 KE-MOTI-235021-CS-QCBS / Consultancy Services to undertake Physical Planning, Cadastral Survey and detailed Integrated settlement Quality And Cost- Topographical Survey of 8 IDA / 67590 Prior Open - International 1,300,000.00 0.00 Under Review 2021-05-21 2021-06-11 2021-07-25 2021-08-22 2021-09-21 2021-10-26 2021-11-30 2023-05-24 upgrading Based Selection selected Informal Settlements in Siaya, Homabay, Bungoma, Transzoia and West Pokot Counties Lot V- Cluster 3 KE-MOTI-235022-CS-QCBS / Consultancy Services to undertake Physical Planning, Cadastral Survey and detailed Integrated settlement Quality And Cost- Topographical Survey of 11 IDA / 67590 Prior Open - International 1,300,000.00 0.00 Under Review 2021-05-21 2021-06-11 2021-07-25 2021-08-22 2021-09-21 2021-10-26 2021-11-30 2023-05-24 upgrading Based Selection selected informal settlements in Kiambu, Tharaka Nithi and Machakos Counties. Lot V - Cluster 2 KE-MOTI-235024-CS-QCBS / Consultancy Services to undertake Physical Planning, Cadastral Survey and detailed Integrated settlement Quality And Cost- Topographical Survey of 10 IDA / 67590 Prior Open - International 1,300,000.00 0.00 Under Review 2021-05-21 2021-06-11 2021-07-25 2021-08-22 2021-09-21 2021-10-26 2021-11-30 2023-05-24 upgrading Based Selection selected Informal Settlements in Kilifi, Kitui, Makuenei and Taita Taveta Counties Lot V- Cluster 1 KE-MOTI-238013-CS-QCBS / Consultancy Services for Program management and Quality And Cost- Pending IDA / 67590 Prior Open - International 1,800,000.00 0.00 2021-06-11 2021-07-02 2021-08-15 2021-09-12 2021-10-12 2021-11-16 2021-12-21 2023-12-11 Independent Performance coordination Based Selection Implementation assessment KE-MOTI-238027-CS-QCBS / Consultancy Service for Institutional capacity Quality And Cost- Pending Mapping and Preparation of IDA / 67590 development for slum Prior Open - International 1,600,000.00 0.00 2021-06-11 2021-07-02 2021-08-15 2021-09-12 2021-10-12 2021-11-16 2021-12-21 2022-04-20 Based Selection Implementation National Geodatabase for upgrading Slums/ Informal settlements INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-214054-CS-INDV / Individual Consultancy Services for Program management and Under IDA / 67590 Post Consultant Open 180,000.00 0.00 2021-02-14 2021-03-16 2021-04-04 2021-04-25 2021-05-30 2021-11-26 Individual Program Assistant coordination Implementation Selection Consultant (1No) KE-MOTI-214061-CS-INDV / Individual Consultancy Services for Program management and Under IDA / 67590 Post Consultant Open 160,000.00 0.00 2021-02-17 2021-03-16 2021-04-07 2021-04-28 2021-06-02 2021-11-29 Individual Environmental coordination Implementation Selection Safeguard Consultant (1No) KE-MOTI-215303-CS-INDV / Individual Consultancy Services for a Integrated settlement Under IDA / 67590 Post Consultant Open 155,000.00 0.00 2021-02-08 2021-03-22 2021-03-29 2021-04-19 2021-05-24 2021-11-20 Land Surveyor Consultant ( 1 upgrading Implementation Selection No) Page 2 KE-MOTI-215304-CS-INDV / Individual Consultancy Services for a Integrated settlement Under IDA / 67590 Post Consultant Open 155,000.00 0.00 2021-02-08 2021-03-22 2021-03-29 2021-04-19 2021-05-24 2021-11-20 Land Administration upgrading Implementation Selection Consultant ( 1 No) KE-MOTI-216647-CS-INDV / Individual Consultancy Services for Integrated settlement Under IDA / 67590 Post Consultant Open 149,000.00 0.00 2021-02-07 2021-03-25 2021-03-28 2021-04-18 2021-05-23 2021-11-19 Individual Physical Planning upgrading Implementation Selection Consultants KE-MOTI-215103-CS-INDV / Individual Consultancy Services for Civil Integrated settlement Under IDA / 67590 Prior Consultant Open 306,000.00 0.00 2021-02-08 2021-03-31 2021-03-29 2021-04-19 2021-05-24 2021-11-20 Engineer ( Individual upgrading Implementation Selection Consultant) KE-MOTI-216970-CS-INDV / Individual Consultancy Services for Program management and Under IDA / 67590 Post Consultant Open 170,000.00 0.00 2021-02-08 2021-03-16 2021-03-29 2021-04-19 2021-05-24 2021-11-20 Individual Social Safeguard coordination Implementation Selection Consultant KE-MOTI-213869-CS-INDV / Individual Program management and Under Consultancy Services for IDA / 67590 Prior Consultant Open 160,000.00 0.00 2021-02-08 2021-03-18 2021-03-29 2021-04-19 2021-05-24 2023-05-14 coordination Implementation Procurement Consultant Selection KE-MOTI-214048-CS-INDV / Individual Consultancy Services for Program management and Under IDA / 67590 Prior Consultant Open 200,000.00 0.00 2021-02-18 2021-03-23 2021-04-08 2021-04-29 2021-06-03 2021-11-30 Individual Communication coordination Implementation Selection Consultant KE-MOTI-216641-CS-INDV / Individual Integrated settlement Under Consultancy Services for Civil IDA / 67590 Prior Consultant Open 306,000.00 0.00 2021-02-08 2021-04-12 2021-03-29 2021-04-19 2021-05-24 2021-11-20 upgrading Implementation Engineer (Individual) Selection KE-MOTI-216642-CS-INDV / Individual Integrated settlement Under Consultancy Services for Civil IDA / 67590 Prior Consultant Open 306,000.00 0.00 2021-02-08 2021-03-31 2021-03-29 2021-04-19 2021-05-24 2021-11-20 upgrading Implementation Engineer (Individual) Selection KE-MOTI-216648-CS-INDV / Individual Consultancy Services for Integrated settlement Under IDA / 67590 Post Consultant Open 149,000.00 0.00 2021-02-07 2021-03-25 2021-03-28 2021-04-18 2021-05-23 2021-11-19 Individual Physical Planning upgrading Implementation Selection Consultant KE-MOTI-216656-CS-INDV / Individual Consultancy Services for Integrated settlement Under IDA / 67590 Post Consultant Open 170,000.00 0.00 2021-02-08 2021-03-16 2021-03-29 2021-04-19 2021-05-24 2021-11-20 Individual Social Safeguards upgrading Implementation Selection Expert (Individual) KE-MOTI-216657-CS-INDV / Individual Consultancy Services for Integrated settlement Under IDA / 67590 Post Consultant Open 170,000.00 0.00 2021-02-08 2021-03-16 2021-03-29 2021-04-19 2021-05-24 2021-11-20 Individaul Social Safeguards upgrading Implementation Selection Expert KE-MOTI-223918-CS-INDV / Consultancy Services for Individual Integrated settlement Under Individual Geographical IDA / 67590 Post Consultant Open 170,000.00 0.00 2021-03-15 2021-03-22 2021-05-03 2021-05-24 2021-06-28 2021-12-25 upgrading Implementation Information System (GIS) Selection Consultant KE-MOTI-223919-CS-INDV / Individual Consultancy Services for Program management and Under IDA / 67590 Post Consultant Open 150,000.00 0.00 2021-03-15 2021-04-29 2021-05-03 2021-05-24 2021-06-28 2021-12-25 Individual Urban Planning coordination Implementation Selection Consultant to assist the CoG KE-MOTI-223920-CS-INDV / Individual Consultancy Services for Program management and Under IDA / 67590 Post Consultant Open 150,000.00 0.00 2021-03-23 2021-04-29 2021-05-11 2021-06-01 2021-07-06 2023-06-26 Individual Procurement coordination Implementation Selection Consultant to assist the CoG Page 3 Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [This is the first procurement plan) 2. Date of General Procurement Notice: April 25, 2017 3. Period covered by this procurement plan: September 2016 to June 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) NA 3. ICB (Works) Above US$ 7 million All 4. NCB (Works) NA 5. ICB and LIB (Non-Consultant Above US$ 1,500,000 All Services) 6 NCB (Non-Consultant Services) NA [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [CDD project implementation Manual to be issued by DRDIP PIU, MoANR for Bank approval) 4. Reference to (if any) Project Operational/Procurement Manual: DRDIP Procurement Manual to be issued by DRDIP PIU. 5. Any Other Special Procurement Arrangements: NA 6. Summary of the Procurement Packages planned during the first 18 July 9, 2010 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary NA NA NA NA of the ICB (Works) Summary 6.69 4 No Prior of the ICB (Goods) Summary 3.8 9 No Post All of the NCB (Works) Summary 14.70 14 No Post All of the NCB (Goods) Summary NA NA NA NA of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Commentes Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) All 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: NA July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 0.35 2 Prior of number of contracts that will be let under QCBS Summary 1.4 38 Post LCS/ IC of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Eastern Africa : Development Response to Displacement Impacts Project in the HoA PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-08-10 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152822 GPN Date: Project Name: Development Response to Displacement Impacts Project in the HoA Loan / Credit No: IDA / 58210 Office of the Prime Minister Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned UG-OPM-22288-CW-RFQ / Project Management, and Single Stage - One 2018-09- Partitioning of offices at IDA / 58210 Post Request for Bids Limited 32,877.00 0.00 Canceled 2017-11-30 2017-12-05 2018-01-16 2018-02-15 2018-03-22 Monitoring and Evaluation Envelope 18 Kampala GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-OPM-22297-GO-RFQ / Project Management, and Request for Single Stage - One Installation of Air conditioners IDA / 58210 Post Limited 19,178.00 12,369.46 Completed 2017-10-28 2018-02-02 2017-12-23 2018-04-06 2018-06-21 2018-04-28 Monitoring and Evaluation Quotations Envelope at the DRDIP Kampala office UG-OPM-22304-GO-RFQ / Project Management, and Request for Single Stage - One Installation of Window Blinds IDA / 58210 Post Limited 2,740.00 2,567.46 Completed 2017-10-28 2018-02-02 2017-12-23 2018-03-09 2018-06-21 2018-05-21 Monitoring and Evaluation Quotations Envelope at the Kampala offices UG-OPM-22310-GO-RFQ / Procurement of Assorted Office Furniture (1.No. Conference Table plus 26 Visitors Chairs, 13 No.Office Project Management, and Request for Single Stage - One Desks, 13 No. Office Chairs, IDA / 58210 Post Limited 73,973.00 33,021.06 Completed 2017-10-25 2017-11-21 2017-12-20 2018-02-28 2018-06-18 2018-05-21 Monitoring and Evaluation Quotations Envelope 26 No. Visitors chairs, 2No Sofa Sets, 2No. Coffee set, 1No. Round Table, 1No. Reception/ Front Desk Unit, 1No. Paper trim UG-OPM-29346-GO-RFB / Procurement of Motorvehicles (Lot 1: 1 No Station Wagon Type A (Not exceeding Project Management, and Single Stage - One IDA / 58210 Prior Request for Bids Open - National 1,064,600.00 0.00 Canceled 2017-11-24 2017-11-29 2018-01-10 2018-02-09 2018-03-16 2018-09-12 3000cc), Station Wagon Type Monitoring and Evaluation Envelope B (Not exceeding 2800cc), Lot 2: 15 No Double Cabin Pickups, Lot 3: 17 No Motorcycles) UG-OPM-39369-GO-RFB / Procurement of Assorted Motor vehicles - 6 Double Project Management, and Single Stage - One IDA / 58210 Post Request for Bids Open - National 1,008,705.00 390,961.72 Completed 2018-02-02 2018-03-01 2018-02-07 2018-03-21 2018-03-29 2018-04-20 2018-04-19 2018-05-25 2019-04-30 2018-07-09 2019-06-06 cabins, 1 station wagon and Monitoring and Evaluation Envelope 23 motorcycles for field operations UG-OPM-22084-GO-RFB / Procurement of ICT Hardware/ Equipment (31 Laptops, 3 Desktop Computers, 17 Small Project Management, and Single Stage - One and Medium Duty IDA / 58210 Post Request for Bids Open - National 170,693.00 161,492.06 Completed 2018-02-05 2018-02-12 2018-02-10 2018-07-12 2018-03-24 2018-03-12 2018-04-23 2018-03-23 2018-05-28 2018-06-13 2018-11-24 2019-01-21 Monitoring and Evaluation Envelope Photocopiers, 2 Printers, 15 Scanners, 1 Projector, 17 Internet Modems, 29 computer Tablets) UG-OPM-81114-GO-RFB / Project Management, and Single Stage - One purchase of 8 Double Cabin IDA / 58210 Post Request for Bids Open - National 328,205.10 380,179.59 Completed 2019-01-14 2019-04-11 2019-01-19 2019-03-02 2019-05-15 2019-04-01 2019-05-29 2019-05-06 2019-09-05 2019-11-02 2019-09-30 Monitoring and Evaluation Envelope Pickups UG-OPM-110980-GO-DIR / Project Management, and Single Stage - One Purchase of 23 Motor Cycles IDA / 58210 Post Request for Bids Open - National 84,736.84 96,899.98 Completed 2019-05-06 2019-05-09 2019-05-11 2019-06-22 2019-06-10 2019-07-22 2019-06-27 2019-08-26 2019-10-17 2020-02-22 2019-11-01 Monitoring and Evaluation Envelope for Project Operations UG-OPM-120099-GO-RFQ / Purchase of 13 Multipurpose Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 3,448.00 4,119.41 Completed 2019-07-05 2019-07-08 2019-08-30 2019-09-04 2020-02-26 2019-09-20 Power Stabilizers for District Monitoring and Evaluation Quotations Envelope Photocopier Machines UG-OPM-124188-GO-RFQ / Project Management, and Request for Single Stage - One Purchase of Assorted ICT IDA / 58210 Post Limited 92,308.00 81,046.54 Completed 2019-08-30 2020-01-16 2019-10-25 2020-06-26 2020-04-22 2020-10-20 Monitoring and Evaluation Quotations Envelope Equipment UG-OPM-124418-GO-RFQ / Project Management, and Request for Single Stage - One Purchase of construction IDA / 58210 Post Limited 2,718.00 2,846.34 Completed 2019-08-10 2019-08-16 2019-10-05 2019-10-15 2020-04-02 2019-11-12 Monitoring and Evaluation Quotations Envelope Safety Gear UG-OPM-125409-GO-RFQ / Project Management, and Request for Single Stage - One Purchase of 4 Motorcycles for IDA / 58210 Post Limited 15,384.00 16,777.59 Completed 2019-08-30 2019-11-29 2019-10-25 2020-02-11 2020-04-22 2020-03-05 Monitoring and Evaluation Quotations Envelope District Operations UG-OPM-125414-GO-RFB / Project Management, and Single Stage - One Purchase of 3 Double Cabin IDA / 58210 Post Request for Bids Open - National 163,461.00 159,093.71 Completed 2019-08-30 2020-05-11 2019-09-04 2019-10-16 2020-06-29 2019-11-15 2020-06-29 2019-12-20 2020-11-24 2020-06-17 2021-03-31 Monitoring and Evaluation Envelope Pickups UG-OPM-125415-GO-RFQ / Regional Support for Request for Single Stage - One purchase of Furniture for IDA / 58210 Coordination, Capacity and Post Limited 25,641.00 21,981.41 Completed 2019-09-07 2020-05-21 2019-11-02 2020-07-17 2020-04-30 2020-09-09 Quotations Envelope Districts Operations Knowledge Page 1 UG-OPM-124420-GO-RFQ / Purchase of Material Testing Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 10,102.00 0.00 Canceled 2019-08-24 2019-10-19 2020-04-16 Equipment for Project Monitoring and Evaluation Quotations Envelope Operations UG-OPM-125412-GO-RFB / Project Management, and Single Stage - One Purchase of 4 station wagon IDA / 58210 Post Request for Bids Open - National 272,547.00 0.00 Canceled 2019-08-26 2019-08-31 2019-10-12 2019-11-11 2019-12-16 2020-06-13 Monitoring and Evaluation Envelope Vehicles UG-OPM-22312-GO-DIR / Project Management, and Request for Single Stage - One Assorted office stationery and IDA / 58210 Post Limited 19,178.00 0.00 Canceled 2017-11-05 2017-12-31 2018-06-29 Monitoring and Evaluation Quotations Envelope other office consumables UG-OPM-187073-GO-RFQ / Project Management, and Single Stage - One Purchase of 145 Biometric IDA / 58210 Post Request for Bids Open - National 117,567.00 134,856.46 Completed 2020-08-16 2020-08-06 2020-08-21 2020-10-02 2020-10-22 2020-11-01 2020-11-09 2020-12-06 2021-02-12 2021-06-04 2021-03-26 Monitoring and Evaluation Envelope Tablets FY-20-21 UG-OPM-187075-GO-RFQ / Pending Purchase of an Environmental Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 23,783.00 0.00 Implementati 2020-08-29 2020-10-24 2021-04-22 and Monitoring Drone FY 20- Monitoring and Evaluation Quotations Envelope on 21 UG-OPM-187174-GO-RFB / Under Project Management, and Single Stage - One Purchase of Assorted ICT IDA / 58210 Post Request for Bids Open - National 260,270.00 194,057.87 Implementati 2020-08-23 2020-11-16 2020-08-28 2020-10-09 2021-01-04 2020-11-08 2021-01-19 2020-12-13 2021-06-11 Monitoring and Evaluation Envelope Equipment FY 2020-2021 on UG-OPM-187178-GO-RFQ / Purchase of Material and Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 18,919.00 17,053.12 Signed 2020-09-05 2020-10-20 2020-10-31 2021-01-08 2021-04-29 Safety Testing Equipment - FY Monitoring and Evaluation Quotations Envelope 20-21 UG-OPM-187188-GO-RFQ / Project Management, and Request for Single Stage - One Purchase of Assorted IDA / 58210 Post Limited 27,027.00 25,723.15 Completed 2020-08-29 2020-12-14 2020-10-24 2021-03-12 2021-04-22 2021-03-22 Monitoring and Evaluation Quotations Envelope Furniture FY 2020-2021 UG-OPM-187189-GO-RFQ / Purchase of Standby Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 18,919.00 18,881.22 Completed 2020-09-05 2020-12-14 2020-10-31 2021-03-12 2021-04-29 2021-03-22 Generator for Ruth Towers - Monitoring and Evaluation Quotations Envelope FY 2020-2021 UG-OPM-187274-GO-RFQ / Video Camera, Still photo Pending camera, voice recorder, SD Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 8,108.00 0.00 Implementati 2020-08-29 2020-10-24 2021-04-22 cards, tripod stand, video Monitoring and Evaluation Quotations Envelope on editing desk top and software - FY 2020-2021 UG-OPM-187275-GO-RFQ / camera's, radios flash cards Pending Project Management, and Request for Single Stage - One for center and districts (for 88 IDA / 58210 Post Limited 20,270.00 0.00 Implementati 2020-09-19 2020-11-14 2021-05-13 Monitoring and Evaluation Quotations Envelope watersheds and for on settlements) - FY 2020-2021 UG-OPM-72397-GO-RFQ / Project Management, and Request for Single Stage - One Purchase of 30 Electronic IDA / 58210 Post Limited 13,077.00 0.00 Canceled 2018-08-25 2018-10-20 2019-04-18 Monitoring and Evaluation Quotations Envelope Tablets UG-OPM-125420-GO-DIR / Purchase of Biometric Based Project Management, and Tablets for the Management IDA / 58210 Post Direct Selection Direct 51,282.00 0.00 Canceled 2019-08-26 2019-08-31 2019-10-05 2020-04-02 Monitoring and Evaluation Information System and Data Collection UG-OPM-190124-GO-RFQ / Project Management, and Request for Single Stage - One purchase 3 motorcycles fy IDA / 58210 Post Limited 13,461.00 13,290.95 Signed 2020-09-05 2021-01-19 2020-10-31 2021-04-01 2021-04-29 Monitoring and Evaluation Quotations Envelope 2020-2021 UG-OPM-187191-GO-RFB / Pending Purchase of 7 Double cabin Project Management, and Single Stage - One IDA / 58210 Post Request for Bids Open - National 487,807.00 0.00 Implementati 2020-09-07 2020-09-12 2020-10-24 2020-11-23 2020-12-28 2021-06-26 Pickups and 1 Station Wagon Monitoring and Evaluation Envelope on - FY 2020-2021 UG-OPM-222266-GO-RFQ / Pending Purchase of 7 Laptops, 2 Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 18,736.00 0.00 Implementati 2021-03-13 2021-05-08 2021-11-04 Mobile Printers and Network Monitoring and Evaluation Quotations Envelope on Storage - FY 2020-2021 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-OPM-22095-NC-DIR / Project Management, and LAN set up/ extension to the IDA / 58210 Prior Direct Selection Direct 10,959.00 11,824.67 Signed 2017-08-21 2018-02-13 2017-08-26 2018-02-23 2017-09-30 2018-05-18 2018-03-29 Monitoring and Evaluation DRDIP Offices UG-OPM-22307-NC-DIR / Procurement of Additional Project Management, and Office Space for DRDIP TST at IDA / 58210 Prior Direct Selection Direct 68,493.00 69,120.00 Completed 2017-08-14 2017-08-19 2017-10-30 2017-09-23 2018-01-23 2018-03-22 2018-02-27 Monitoring and Evaluation Ruth Towers (One years Contract) UG-OPM-22306-NC-RFQ / Project Management, and Request for Single Stage - One Office Branding for the IDA / 58210 Post Limited 548.00 1,316.80 Completed 2017-10-28 2018-10-01 2017-12-23 2019-02-05 2018-06-21 2019-03-11 Monitoring and Evaluation Quotations Envelope Kampala Offices UG-OPM-22287-NC-DIR / Development of a Project Project Management, and IDA / 58210 Prior Direct Selection Direct 300,905.00 287,226.00 Signed 2017-12-08 2017-12-13 2018-02-06 2018-01-17 2018-04-20 2018-07-16 Management Information Monitoring and Evaluation System (MIS) UG-OPM-45668-NC-DIR / Purchase and Installation of Project Management, and IDA / 58210 Prior Direct Selection Direct 9,642.00 8,090.36 Completed 2018-02-05 2018-03-04 2018-02-10 2018-03-09 2018-03-17 2018-05-30 2018-09-13 2018-06-27 Wireless internet for DRDIP Monitoring and Evaluation Offices Page 2 UG-OPM-73171-NC-RFQ / Project Management, and Request for Single Stage - One Development of a Website for IDA / 58210 Post Limited 15,385.00 0.00 Canceled 2018-09-01 2018-10-27 2019-04-25 Monitoring and Evaluation Quotations Envelope DRDIP UG-OPM-73186-NC-RFQ / Project Management, and Request for Single Stage - One Office Branding for Kampala IDA / 58210 Post Limited 1,282.00 3,323.96 Completed 2018-08-31 2019-11-29 2018-10-26 2020-08-03 2019-04-24 2020-08-04 Monitoring and Evaluation Quotations Envelope Offices UG-OPM-91818-NC-RFQ / Project Management, and Request for Single Stage - One Purchase of Printed Materials ( IDA / 58210 Post Limited 12,279.00 12,501.94 Completed 2018-12-29 2019-02-08 2019-02-23 2019-05-20 2019-08-22 2019-08-19 Monitoring and Evaluation Quotations Envelope Assorted ) UG-OPM-91819-NC-RFQ / Project Management, and Request for Single Stage - One Purchase of T- Shirts and IDA / 58210 Post Limited 4,423.00 4,054.73 Completed 2018-12-29 2019-01-29 2019-02-23 2019-02-22 2019-08-22 2019-04-17 Monitoring and Evaluation Quotations Envelope Caps UG-OPM-22104-NC-RFQ / Project Management, and Request for Single Stage - One PABX Upgrade/ extension to IDA / 58210 Post Limited 13,699.00 0.00 Canceled 2017-10-28 2017-12-23 2018-06-21 Monitoring and Evaluation Quotations Envelope the refugees office UG-OPM-126639-NC-RFQ / Pending Project Management, and Request for Single Stage - One Wireless Internet for DRDIP IDA / 58210 Post Limited 9,642.00 0.00 Implementati 2019-08-30 2019-10-25 2020-04-22 Monitoring and Evaluation Quotations Envelope Offices (one Year Contract) on UG-OPM-143186-NC-RFQ / Project Management, and Request for Single Stage - One Video Production services for IDA / 58210 Post Limited 2,261.00 2,332.74 Completed 2019-11-09 2019-11-29 2020-01-04 2020-01-29 2020-07-02 2020-06-12 Monitoring and Evaluation Quotations Envelope DRDIP Commissioning UG-OPM-143324-NC-RFQ / Project Management, and Request for Single Stage - One Purchase of Car Tracking IDA / 58210 Post Limited 2,564.00 3,853.08 Completed 2019-11-09 2019-11-29 2020-01-04 2019-12-17 2020-07-02 2020-01-15 Monitoring and Evaluation Quotations Envelope devices for Project Vehicles UG-OPM-147676-NC-RFQ / Project Management, and Request for Single Stage - One Airing of News Features and IDA / 58210 Post Limited 25,692.00 18,184.47 Signed 2019-12-07 2020-01-16 2020-02-01 2020-03-26 2020-07-30 2020-06-20 Monitoring and Evaluation Quotations Envelope Documentaries UG-OPM-125419-NC-RFQ / Purchase and Installation of a Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 10,256.00 0.00 Canceled 2019-08-31 2019-10-26 2020-04-23 CCTV Camera System at Ruth Monitoring and Evaluation Quotations Envelope Towers UG-OPM-124185-NC-RFQ / Project Management, and Request for Single Stage - One Development of DRDIP/OPM IDA / 58210 Post Limited 15,385.00 0.00 Canceled 2019-08-30 2019-10-25 2020-04-22 Monitoring and Evaluation Quotations Envelope Website UG-OPM-125416-NC-RFQ / Project Management, and Request for Single Stage - One upgrade of the Existing Local IDA / 58210 Post Limited 3,846.00 0.00 Canceled 2019-09-01 2019-10-27 2020-04-24 Monitoring and Evaluation Quotations Envelope Area Network at Ruth Towers UG-OPM-187177-NC-RFQ / Purchase of installation of Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 13,514.00 13,139.79 Completed 2020-08-21 2020-09-29 2020-10-16 2020-11-26 2021-04-14 2020-12-30 CCTV Cameras at Ruth Towers Monitoring and Evaluation Quotations Envelope -FY 20-21 UG-OPM-187273-NC-DIR / Supply, Installation, Configuration and Support of Project Management, and IDA / 58210 Post Direct Selection Direct 12,454.00 14,670.23 Completed 2020-08-17 2020-07-20 2020-08-22 2020-09-29 2020-09-26 2020-11-11 2021-03-25 2020-11-25 SSL Certificate for DRDIP Monitoring and Evaluation Management Information System - FY 2020-2021 UG-OPM-193664-NC-DIR / Purchase of Mobile Internet Project Management, and IDA / 58210 Post Direct Selection Direct 2,562.00 5,573.65 Signed 2020-09-21 2020-08-27 2020-09-26 2020-10-12 2020-10-31 2020-11-24 2021-04-29 2021-01-11 for M&E Tablets and Modems Monitoring and Evaluation - FY 2020-2021 UG-OPM-233696-NC-RFQ / Pending Development and Deployment Project Management, and Request for Single Stage - One IDA / 58210 Post Limited 16,216.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 of DRDIP Website Information Monitoring and Evaluation Quotations Envelope on Portal UG-OPM-233921-NC-DIR / Pending Service Support Contract for Project Management, and IDA / 58210 Post Direct Selection Direct 95,654.00 0.00 Implementati 2021-05-24 2021-05-29 2021-07-03 2021-12-30 DRDIP Management Monitoring and Evaluation on Information System CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-OPM-173625-CS-LCS / Project Management, and Least Cost Under Independent Procurement IDA / 58210 Post Open - National 64,102.00 0.00 2020-07-20 2020-07-14 2020-08-10 2020-09-23 2020-12-10 2020-10-21 2021-01-18 2020-11-20 2021-02-03 2020-12-25 2021-03-03 2021-01-29 2021-07-28 Monitoring and Evaluation Selection Implementation Audit UG-OPM-225769-CS-CQS / Consultancy Services for Consultant Project Management, and Under Assessment of performance of IDA / 58210 Post Qualification Open - National 40,540.00 0.00 2021-03-29 2021-04-01 2021-04-19 2021-06-02 2021-07-02 2021-08-06 2022-02-02 Monitoring and Evaluation Implementation Livelihoods model & Selection interventions FY 20-21 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual UG-OPM-22326-CS-INDV / Project Management, and IDA / 58210 Post Consultant Open 76,010.88 93,857.95 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-17 2017-12-01 2018-12-19 2018-05-30 M & E Officer Monitoring and Evaluation Selection Individual UG-OPM-22332-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Open 98,367.12 0.00 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Project Engineer Monitoring and Evaluation Implementation Selection Page 3 Individual UG-OPM-22344-CS-INDV / Project Management, and Under IDA / 58210 Post Consultant Open 76,010.88 0.00 2017-08-18 2018-01-30 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Livelihood Officer Monitoring and Evaluation Implementation Selection Individual UG-OPM-22345-CS-INDV / Project Management, and IDA / 58210 Post Consultant Open 76,010.88 93,857.95 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-03 2017-12-01 2018-12-21 2018-05-30 Environment Officer Monitoring and Evaluation Selection Individual UG-OPM-22347-CS-INDV / Project Management, and IDA / 58210 Post Consultant Open 76,010.88 93,857.95 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-17 2017-12-01 2018-12-19 2018-05-30 Social Safeguards Officer Monitoring and Evaluation Selection Individual UG-OPM-22349-CS-INDV / Project Management, and IDA / 58210 Post Consultant Open 43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Communication Assistant Monitoring and Evaluation Selection Individual UG-OPM-22352-CS-INDV / Project Management, and Under IDA / 58210 Post Consultant Open 43,651.20 0.00 2017-08-18 2018-01-31 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Administrative Assistant Monitoring and Evaluation Implementation Selection UG-OPM-22355-CS-INDV / Individual Project Management, and Engineering Assistant 1 IDA / 58210 Post Consultant Open 43,651.20 53,958.09 Signed 2017-08-18 2018-01-30 2017-10-06 2018-12-12 2017-10-27 2018-12-12 2017-12-01 2018-12-19 2018-05-30 Monitoring and Evaluation (Kampala Office) Selection UG-OPM-22357-CS-INDV / Individual Project Management, and Engineering Assistant 2 IDA / 58210 Post Consultant Open 43,651.20 53,900.33 Signed 2017-08-18 2018-01-30 2017-10-06 2018-12-12 2017-10-27 2018-12-12 2017-12-01 2018-12-19 2018-05-30 Monitoring and Evaluation (Kampala Office) Selection Individual UG-OPM-22360-CS-INDV / Project Management, and IDA / 58210 Post Consultant Open 43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Social Safeguards Assistant 1 Monitoring and Evaluation Selection Individual UG-OPM-22361-CS-INDV / Project Management, and IDA / 58210 Post Consultant Open 43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Social Safeguards Assistant 2 Monitoring and Evaluation Selection Individual UG-OPM-22362-CS-INDV / Project Management, and IDA / 58210 Post Consultant Open 43,651.20 53,900.33 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-17 2017-12-01 2018-12-19 2018-05-30 Accounts Assistant Monitoring and Evaluation Selection Individual UG-OPM-22363-CS-INDV / Project Management, and IDA / 58210 Post Consultant Open 43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Executive Assistant Monitoring and Evaluation Selection UG-OPM-22367-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-17 2017-12-01 2018-12-19 2018-05-30 Monitoring and Evaluation 1 Selection UG-OPM-22368-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-17 2017-12-01 2018-12-19 2018-05-30 Monitoring and Evaluation 2 Selection UG-OPM-22369-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-17 2017-12-01 2018-12-19 2018-05-30 Monitoring and Evaluation 3 Selection UG-OPM-22372-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-17 2017-12-01 2018-12-19 2018-05-30 Monitoring and Evaluation 4 Selection UG-OPM-22373-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-03 2017-10-27 2018-08-17 2017-12-01 2018-12-21 2018-05-30 Monitoring and Evaluation 5 Selection UG-OPM-22374-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2019-03-04 2017-10-27 2018-08-17 2017-12-01 2019-03-19 2018-05-30 Monitoring and Evaluation 6 Selection UG-OPM-22377-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2019-04-25 2017-10-27 2019-04-25 2017-12-01 2019-04-25 2018-05-30 Monitoring and Evaluation 7 Selection UG-OPM-22379-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2019-03-04 2017-10-27 2019-03-19 2017-12-01 2019-03-19 2018-05-30 Monitoring and Evaluation 8 Selection UG-OPM-22382-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2019-04-18 2017-10-27 2019-04-11 2017-12-01 2019-04-11 2018-05-30 Monitoring and Evaluation 9 Selection UG-OPM-22384-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,238.40 Signed 2017-08-18 2018-01-30 2017-10-06 2018-12-12 2017-10-27 2018-08-17 2017-12-01 2018-12-19 2018-05-30 Monitoring and Evaluation 10 Selection UG-OPM-22387-CS-INDV / Individual Project Management, and District Engineering Assistant IDA / 58210 Post Consultant Open 13,150.56 16,357.80 Signed 2017-08-18 2018-01-30 2017-10-06 2018-08-17 2017-10-27 2018-08-17 2017-12-01 2018-12-12 2018-05-30 Monitoring and Evaluation 11 Selection Individual UG-OPM-22505-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Open 11,835.60 0.00 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Office Attendant 1 Monitoring and Evaluation Implementation Selection Individual UG-OPM-22509-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Open 11,835.60 0.00 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Office Attendant 2 Monitoring and Evaluation Implementation Selection Individual UG-OPM-22515-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Open 9,863.01 0.00 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Driver 1 Monitoring and Evaluation Implementation Selection Individual UG-OPM-22517-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Open 9,863.01 0.00 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Driver 2 Monitoring and Evaluation Implementation Selection Page 4 Individual UG-OPM-22519-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Open 9,863.01 0.00 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Driver 3 Monitoring and Evaluation Implementation Selection Individual UG-OPM-22524-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Open 9,863.01 0.00 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Driver 4 Monitoring and Evaluation Implementation Selection Individual UG-OPM-22527-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Open 9,863.01 0.00 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 Driver 5 Monitoring and Evaluation Implementation Selection UG-OPM-22316-CS-CDS / Project Management, and Under IDA / 58210 Prior Direct Selection Direct 120,723.12 0.00 2017-10-02 2017-10-12 2017-12-16 2018-06-14 Project Manager - DRDIP Monitoring and Evaluation Implementation UG-OPM-30462-CS-CDS / Procurement of Consulting services for Updating of the Environmental and Social Project Management, and Under Management Framework and IDA / 58210 Prior Direct Selection Direct 41,551.00 0.00 2017-10-05 2017-10-17 2017-10-09 2017-10-19 2017-10-27 2017-11-24 Monitoring and Evaluation Implementation Resettlement Policy Framework for the Development Response to Displacement Impact Project. UG-OPM-22353-CS-CDS / Project Management, and IDA / 58210 Prior Direct Selection Direct 43,651.20 0.00 Canceled 2017-08-18 2017-08-28 2017-11-01 2018-04-30 Procurement Assistant Officer Monitoring and Evaluation Individual UG-OPM-22343-CS-CDS / Project Management, and Pending IDA / 58210 Post Consultant Limited 76,010.88 0.00 2017-10-20 2017-10-25 2017-11-15 2017-12-20 2018-06-18 Project Accountant Monitoring and Evaluation Implementation Selection Individual UG-OPM-22350-CS-CDS / Project Management, and IDA / 58210 Post Consultant Limited 43,651.20 0.00 Canceled 2017-10-27 2017-11-01 2017-11-22 2017-12-27 2018-06-25 ICT Assistant Officer Monitoring and Evaluation Selection UG-OPM-52236-CS-INDV / Individual Project Management, and Consulting Services for IDA / 58210 Post Consultant Open 76,010.00 0.00 Canceled 2018-03-05 2019-10-17 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Monitoring and Evaluation Communications Officer Selection UG-OPM-52238-CS-INDV / Individual Project Management, and Consultant services for ICT IDA / 58210 Post Consultant Open 76,010.00 93,857.95 Signed 2018-03-05 2018-01-30 2018-04-23 2018-12-12 2018-05-14 2018-12-12 2018-06-18 2018-12-19 2018-12-15 Monitoring and Evaluation Officer Selection UG-OPM-61708-CS-INDV / Individual Project Management, and Consulting Services for a IDA / 58210 Post Consultant Limited 76,010.00 93,982.80 Signed 2018-05-22 2017-10-02 2018-05-27 2017-11-13 2018-06-17 2017-11-30 2018-07-22 2017-11-30 2019-01-18 Monitoring and Evaluation Procurement Officer Selection UG-OPM-22319-CS-CDS / Project Management, and IDA / 58210 Prior Direct Selection Direct 164,383.56 0.00 Canceled 2017-08-18 2017-08-28 2017-11-01 2018-04-30 Baseline survey Monitoring and Evaluation UG-OPM-22349-CS-INDV-2 Individual / Individual consulting Project Management, and IDA / 58210 Post Consultant Open 43,651.20 0.00 Canceled 2019-08-26 2019-08-16 2019-10-14 2019-11-04 2019-12-09 2020-06-06 services for a communication Monitoring and Evaluation Selection Assistant Individual UG-OPM-143192-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Limited 76,010.00 0.00 2019-11-04 2019-11-09 2019-11-30 2020-01-04 2020-07-02 Communications officer Monitoring and Evaluation Implementation Selection Individual UG-OPM-143193-CS-INDV / Project Management, and Pending IDA / 58210 Post Consultant Limited 43,651.20 0.00 2019-11-04 2019-11-09 2019-11-30 2020-01-04 2020-07-02 Communications Assistant Monitoring and Evaluation Implementation Selection UG-OPM-173329-CS-CDS / Project Management, and Environmental and Social IDA / 58210 Post Direct Selection Direct 64,102.00 79,134.94 Completed 2020-06-01 2020-03-03 2020-06-11 2020-05-21 2020-08-15 2020-10-01 2021-02-11 2021-01-21 Monitoring and Evaluation Audit for DRDIP UG-OPM-187276-CS-INDV / Individual Project Management, and Pending Natural Resources Officer - FY IDA / 58210 Post Consultant Limited 74,983.00 0.00 2020-09-21 2020-09-26 2020-10-17 2020-11-21 2021-05-20 Monitoring and Evaluation Implementation 2020-2021 Selection UG-OPM-187277-CS-INDV / Individual Project Management, and Pending GBV and VAC Officer - FY IDA / 58210 Post Consultant Limited 74,983.00 0.00 2020-09-14 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Monitoring and Evaluation Implementation 2020-2021 Selection UG-OPM-187278-CS-INDV / Individual District Engineering Assistant Project Management, and Pending IDA / 58210 Post Consultant Open 13,150.56 0.00 2020-09-21 2020-11-09 2020-11-30 2021-01-04 2021-07-03 - Terego District - FY 2020- Monitoring and Evaluation Implementation Selection 2021 UG-OPM-187279-CS-INDV / Individual District Engineering Assistant Project Management, and Pending IDA / 58210 Post Consultant Open 13,150.56 0.00 2020-09-14 2020-11-02 2020-11-23 2020-12-28 2021-06-26 - Obongi District - FY 2020- Monitoring and Evaluation Implementation Selection 2021 UG-OPM-187280-CS-INDV / Individual District Engineering Assistant Project Management, and Pending IDA / 58210 Post Consultant Open 13,150.56 0.00 2020-09-21 2020-11-09 2020-11-30 2021-01-04 2021-07-03 - Kikuube District - FY 2020- Monitoring and Evaluation Implementation Selection 2021 UG-OPM-187281-CS-INDV / Individual District Engineering Assistant Project Management, and Pending IDA / 58210 Post Consultant Open 13,150.56 0.00 2020-09-28 2020-11-16 2020-12-07 2021-01-11 2021-07-10 - Madi Okollo District - FY Monitoring and Evaluation Implementation Selection 2020-2021 UG-OPM-225948-CS-CDS / Assessment of Natural Project Management, and Resources & Ecosystems to IDA / 58210 Prior Direct Selection Direct 32,432.00 0.00 Canceled 2021-03-29 2021-04-08 2021-06-12 2021-12-09 Monitoring and Evaluation support sustainable livelihoods UG-OPM-225951-CS-CDS / Project Management, and Under Energy value chain and IDA / 58210 Post Direct Selection Direct 27,027.00 0.00 2021-03-29 2021-04-01 2021-04-08 2021-06-12 2021-12-09 Monitoring and Evaluation Implementation market assessments Page 5 UG-OPM-229923-CS-CDS / Assessment of Natural Project Management, and IDA / 58210 Post Direct Selection Direct 31,578.00 0.00 Under Review 2021-04-26 2021-05-10 2021-05-06 2021-07-10 2022-01-06 Resources and ecosystems Monitoring and Evaluation capacity - FY 20-21 Page 6 PROCUREMENT PLAN (Textual Part) Country: Kyrgyz Republic Full Project Name: Enhancing Resilience in the Kyrgyz Republic Project (ERIK) Project Number: P162635 Project Implementation Project Implementation Unit of the Project agency under MoES Date of the Procurement December 26, 2017 Plan: Period covered by this December 26, 2017 - December 26, 2018 Procurement Plan: Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT Kyrgyz Republic : Enhancing Resilience in Kyrgyzstan Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2017-12-27 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162635 GPN Date: 2020-11-09 Project Name: Enhancing Resilience in Kyrgyzstan Project Loan / Credit No: IDA / V1060, / , IDA / 62380, IDA / 66870, IDA / D6550 M Executing Agency(ies): inistry of Emergency Situations WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-CW/RFB-10 / Improving Safety and Single Stage - One 2023-04- Procurement of civil works for IDA / 62380 Functionality of School Prior Request for Bids Open - International 0.00 Canceled 2021-11-30 2021-12-17 2022-02-15 2022-03-17 2022-04-28 Envelope 28 schools Infrastructure KG-CW/RFB-09 / Improving Safety and Pending Single Stage - One 2022-01- Procurement of civil works for IDA / 62380 Functionality of School Post Request for Bids Open - International 0.00 Implementat 2020-08-25 2020-09-11 2020-11-10 2020-12-10 2021-01-21 Envelope 21 schools Infrastructure ion KG-CW/RFB-01/AF / Improving Safety and Pending Single Stage - One 2023-04- Procurement of civil works for IDA / 66870 Functionality of School Prior Request for Bids Open - International 0.00 Implementat 2021-10-01 2021-10-29 2021-12-13 2022-03-04 2022-04-15 Envelope 15 10 schools Infrastructure ion KG-CW/RFB-02/AF / Improving Safety and Pending Single Stage - One 2024-04- Procurement of civil works for IDA / 66870 Functionality of School Prior Request for Bids Open - International 0.00 Implementat 2022-10-01 2022-10-29 2022-12-13 2023-03-04 2023-04-15 Envelope 14 10 schools Infrastructure ion KG-CW/RFB-03/AF / Improving Safety and Pending Single Stage - One 2025-04- Procurement of civil works for IDA / 66870 Functionality of School Prior Request for Bids Open - International 0.00 Implementat 2023-10-01 2023-10-29 2023-12-13 2024-03-03 2024-04-14 Envelope 14 20 schools Infrastructure ion Pending KG-CW/RFQ-01/AF / Major Project Management and Request for Single Stage - One 2022-01- IDA / 66870 Post Open - National 0.00 Implementat 2021-06-12 2021-11-27 repairs of the PIU office Monitoring & Evaluation Quotations Envelope 26 ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-G/RFB-02 / Equipment Single Stage - One / Post Request for Bids Open - International 0.00 Canceled 2018-04-25 2018-05-23 2018-07-07 2018-08-04 2018-09-01 2019-02-28 for '112' Call Center Envelope KG-G/RFB-02B / Equipment Contingent Emergency Single Stage - One IDA / V1060 Post Request for Bids Open - International 229,590.14 Completed 2018-05-28 2018-07-20 2018-06-08 2018-07-20 2018-07-20 2018-09-04 2018-08-19 2018-09-13 2018-09-23 2018-10-02 2019-03-22 2019-02-26 for '112' Call Center Response Envelope KG-G/RFQ-02/1 / Software Project Management and (1C accounting system for PIU IDA / V1060 Post Direct Selection Direct 7,900.00 Completed 2018-05-29 2018-06-18 2018-06-01 2018-06-18 2018-06-14 2018-06-19 2018-07-14 2018-07-19 Monitoring & Evaluation under the MOES) KG-G/RFQ-01 / Equipment Project Management and Request for Single Stage - One IDA / V1060 Post Open - National 0.00 Canceled 2018-04-27 2018-05-18 2018-06-07 2018-07-17 for PIU Monitoring & Evaluation Quotations Envelope KG-G/RFQ-02 / Software (1C Project Management and Request for Single Stage - One IDA / V1060 Post Open - National 0.00 Canceled 2018-05-05 2018-06-15 2018-08-14 accounting system for MoES) Monitoring & Evaluation Quotations Envelope KG-G/RFB-01 / Equipment Contingent Emergency Single Stage - One IDA / V1060 Post Request for Bids Open - International 0.00 Canceled 2018-05-15 2018-05-29 2018-07-13 2018-08-10 2018-09-07 2019-03-06 for rescue team Response Envelope KG-G/RFB-01A / Equipment for rescue team: Lot #1- Procurement of Contingent Emergency Single Stage - One IDA / V1060 Post Request for Bids Open - National 98,060.00 Completed 2018-06-22 2018-06-28 2018-06-29 2018-06-29 2018-08-03 2018-07-27 2018-09-02 2018-08-06 2018-10-07 2018-10-01 2018-11-21 2018-10-30 rescue tools Response Envelope Lot #2- Procurement of equipment for rescue service KG-G/RFQ-01B / Furniture Project Management and Request for Single Stage - One IDA / V1060 Post Open - National 3,719.77 Completed 2018-06-29 2018-07-20 2018-08-17 2018-09-06 2018-09-16 2018-10-05 for PIU Monitoring & Evaluation Quotations Envelope KG-G/RFQ-01A / Computer Project Management and Request for Single Stage - One IDA / V1060 Post Open - National 19,146.94 Completed 2018-06-29 2018-06-29 2018-08-10 2018-07-12 2018-09-09 2018-08-24 equipment for PIU Monitoring & Evaluation Quotations Envelope KG-G/RFB-02A / Software for Contingent Emergency IDA / V1060 Post Direct Selection Direct 508,250.80 Completed 2018-07-09 2018-08-06 2018-07-14 2018-08-07 2018-08-30 2018-08-28 2019-01-17 2019-01-14 '112' call center Response KG-G/RFB-01B / Equipment for rescue team: Lot#1 - Contingent Emergency Single Stage - One Rescue equipment, Lot#2 - IDA / V1060 Post Request for Bids Open - National 18,141.96 Completed 2018-08-15 2018-08-17 2018-08-17 2018-08-17 2018-09-14 2018-09-07 2018-10-14 2018-09-20 2018-11-11 2018-10-17 2018-12-26 2018-11-23 Response Envelope Fire equipment, Lot #3 - Diving equipment. KG-G/RFB-01C / Equipment for rescue team: Lot#1 - Contingent Emergency Single Stage - One Rescue equipment, Lot#2 - IDA / V1060 Post Request for Bids Open - National 45,416.74 Completed 2018-10-04 2018-10-05 2018-10-05 2018-10-05 2018-10-26 2018-10-26 2018-11-15 2018-11-13 2018-12-10 2018-12-17 2019-01-24 2019-04-12 Response Envelope Fire equipment Re-advertisement KG-G/RFQ-04 / Procurement Enhancing Financial Request for Single Stage - One of office equipment for IDA / 62380 Post Open - National 0.00 Canceled 2019-04-11 2019-05-23 2019-07-22 Protection Quotations Envelope regional offices SIO KG-G/RFQ-05 / Procurement Enhancing Financial Request for Single Stage - One of furniture for regional IDA / 62380 Post Open - National 0.00 Canceled 2019-04-11 2019-05-30 2019-07-29 Protection Quotations Envelope offices SIO Page 1 KG-G/RFQ-07 / Procurement Enhancing Financial Request for Single Stage - One IDA / 62380 Post Open - National 0.00 Canceled 2019-07-14 2019-09-13 2019-12-12 of mobile devices for SIO Protection Quotations Envelope KG-G/RFB-05 / Establishing Strengthening Disaster Single Stage - One the Platform to Exchange the IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-03-28 2019-04-04 2019-05-19 2019-06-16 2019-07-14 2020-07-13 Envelope Data Systems KG-G/RFQ-10 / Procurement Strengthening Disaster of Software for development Request for Single Stage - One IDA / 62380 Preparedness and Response Post Open - International 55,000.00 Completed 2019-04-05 2019-04-05 2019-05-20 2019-07-09 2019-09-17 2019-09-04 of the Unified Duty- Quotations Envelope Systems Dispatching Service 112 KG-G/RFB-03 / Development of the Country-Wide Strengthening Disaster Single Stage - One Integrated Public Notification IDA / 62380 Preparedness and Response Prior Request for Bids Open - International 1,241,130.00 Signed 2019-04-04 2019-06-26 2019-04-19 2019-08-21 2019-06-03 2019-08-22 2019-07-01 2019-10-30 2019-08-12 2019-11-14 2020-02-08 Envelope and Warning System - OKSION Systems System KG-G/RFB-04 / Development of Routine Management Body - Crisis Management Center: Strengthening Disaster Lot #1 purchase of controller Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 103,167.69 Completed 2019-03-25 2019-04-05 2019-03-29 2019-04-05 2019-05-13 2019-05-20 2019-06-10 2019-06-19 2019-07-08 2019-07-10 2019-12-15 2019-12-10 for video wall. Lot# 2 Envelope Systems purchase of satellite equipment. Lot #3 purchase of radio station equipment. KG-G/RFB-09 / Disaster Strengthening Disaster Under Learning Platform for Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Implementati 2020-06-22 2021-05-28 2020-06-26 2021-05-28 2020-08-07 2020-09-04 2020-10-16 2021-02-13 Professional Training Center Envelope Systems on MES KG-G/RFB-10 / Procurement Enhancing Financial Request for Single Stage - One of furniture for regional IDA / 62380 Post Open - National 47,782.91 Completed 2019-04-18 2019-05-13 2019-06-17 2019-07-19 2019-08-16 2019-10-22 Protection Quotations Envelope offices SIO KG-G/RFB-12 / Procurement Enhancing Financial Request for Single Stage - One of office equipment for IDA / 62380 Post Open - National 67,943.35 Completed 2019-04-18 2019-05-13 2019-06-17 2019-07-19 2019-08-16 2019-09-17 Protection Quotations Envelope regional offices SIO KG-G/RFQ-11 / Computer Project Management and IDA / V1060 Post Direct Selection Direct 3,924.70 Completed 2019-05-07 2019-05-17 2019-05-12 2019-05-21 2019-06-16 2019-05-22 2019-07-31 2019-06-05 equipment for PIU Monitoring & Evaluation KG-G/RFQ-12 / Additional Project Management and IDA / V1060 Post Direct Selection Direct 909.09 Completed 2019-05-07 2019-05-17 2019-05-12 2019-05-21 2019-05-24 2019-05-22 2019-06-23 2019-05-29 furniture for PIU Monitoring & Evaluation KG-G/RFQ-09 / Procurement of office equipment for Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - National 0.00 Canceled 2019-03-22 2019-05-08 2019-06-24 Unified Duty- Dispatching Response Quotations Envelope Service 112 KG-G/RFQ-09A / Strengthening Disaster Request for Single Stage - One Procurement of computer IDA / 62380 Preparedness and Response Post Open - National 0.00 Canceled 2019-06-14 2019-07-11 2019-07-24 2019-09-12 Quotations Envelope equipment for 112 system Systems KG-G/RFB-11 / Procurement Enhancing Financial Single Stage - One IDA / 62380 Post Request for Bids Open - International 163,420.25 Completed 2019-06-24 2019-07-22 2019-06-28 2019-07-22 2019-08-09 2019-09-02 2019-08-23 2019-10-01 2019-09-20 2019-10-18 2019-11-19 2020-02-28 of server equipment for SIO Protection Envelope KG-G/RFB-08 / Strengthening the capacity of the newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-06-17 2019-06-21 2019-08-02 2019-08-16 2019-09-13 2019-12-12 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP Strengthening Disaster KG-G/RFQ-13 / Procurement Request for Single Stage - One IDA / V1060 Preparedness and Response Post Open - National 0.00 Canceled 2019-06-16 2019-08-23 2019-07-31 2019-09-29 of compressed air apparatus Quotations Envelope Systems KG-G/RFB-13 / Procurement of hardware for Web portal and newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-08-07 2019-08-16 2019-08-09 2019-08-16 2019-09-20 2019-11-12 2019-10-21 2019-12-04 2019-11-25 2020-02-24 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP. KG-G/RFB-14 / Production of Pending Enhancing Financial Single Stage - One Branded and Promotional IDA / 62380 Post Request for Bids Open - National 0.00 Implementati 2019-08-12 2019-08-15 2019-09-26 2019-10-26 2019-11-26 2020-02-24 Protection Envelope Products for SIO on KG-G/RFB-04A / Development of Routine Strengthening Disaster Single Stage - One Management Body - Crisis IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-08-02 2019-08-13 2019-08-05 2019-08-13 2019-09-19 2019-09-25 2019-10-17 2019-12-05 2019-11-14 2020-02-12 Envelope Management Center: Purchase Systems of satellite equipment KG-G/RFB-15 / Procurement Enhancing Financial Single Stage - One IDA / 62380 Post Request for Bids Open - International 0.00 Terminated 2019-08-07 2019-08-16 2019-08-09 2019-08-16 2019-09-23 2019-09-27 2019-10-23 2019-11-18 2019-11-25 2019-12-25 2020-01-24 of mobile devices for SIO Protection Envelope KG-G/RFB-06A / Goods for operational survey of landslides: Lot #1 - Strengthening Disaster Equipment and car. Lot # 2 - Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-06-03 2019-06-07 2019-06-06 2019-06-06 2019-07-18 2019-07-19 2019-08-01 2019-08-12 2019-08-29 2019-12-17 Mobile meteorological station Envelope Systems and measuring equipment. Lot #3 - UAV and land surveying equipment KG-G/RFB-06C / Strengthening Disaster Single Stage - One Procurement of Off-road IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Canceled 2019-09-27 2019-09-16 2019-09-30 2019-09-17 2019-11-11 2019-12-26 2020-01-23 2020-05-22 Envelope Vehicle Systems KG-G/RFB-06D / Strengthening Disaster Single Stage - One Procurement of UAV and land IDA / 62380 Preparedness and Response Post Request for Bids Open - National 47,819.01 Completed 2019-10-03 2019-09-16 2019-10-07 2019-09-17 2019-11-18 2019-10-08 2020-01-02 2019-10-31 2020-01-30 2019-11-12 2020-05-29 2020-03-18 Envelope survey equipment Systems Page 2 KG-G/RFB-06Е / Strengthening Disaster Single Stage - One Procurement of Measuring IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Canceled 2019-09-27 2019-09-16 2019-09-30 2019-09-17 2019-11-11 2019-10-09 2019-12-26 2020-01-23 2020-05-22 Envelope Equipment Systems KG-G/RFB-06F / Strengthening Disaster Single Stage - One Procurement of Mobile IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-09-27 2019-10-17 2019-09-30 2019-10-18 2019-11-14 2019-12-03 2019-12-30 2019-12-19 2020-02-03 2020-06-02 Envelope Weather Station and Forecast Systems Equipment KG-G/RFQ-13A / Strengthening Disaster Request for Single Stage - One Procurement of compressed IDA / V1060 Preparedness and Response Post Open - National 19,574.61 Completed 2019-10-02 2019-09-24 2019-12-30 2019-12-06 2020-02-28 2020-02-06 Quotations Envelope air apparatus Systems KG-G/DC-01 / Procurement of Software for newly created 15 cluster interdistrict points Strengthening Disaster (points) of monitoring of IDA / 62380 Preparedness and Response Post Direct Selection Direct 176,305.00 Completed 2019-09-30 2019-09-20 2019-10-11 2019-09-26 2019-11-08 2019-10-18 2020-03-07 2019-12-03 hazardous natural processes Systems within the framework of the creation of mobile monitoring points of the ESCMP KG-G/RFQ-09A-2 / Strengthening Disaster Procurement of office Request for Single Stage - One IDA / 62380 Preparedness and Response Post Open - National 9,694.14 Completed 2019-10-05 2019-09-27 2019-11-19 2019-11-14 2020-01-08 2019-12-26 equipment for Unified Duty- Quotations Envelope Systems Dispatching Service 112 KG-G/RFB-06C-2 / Strengthening Disaster Single Stage - One Procurement of Special IDA / 62380 Preparedness and Response Post Request for Bids Open - International 55,798.40 Completed 2020-02-06 2020-01-24 2020-02-12 2020-01-23 2020-04-02 2020-03-16 2020-05-12 2020-05-18 2020-06-16 2020-06-05 2020-10-14 2020-10-01 Envelope Vehicles Systems KG-G/RFB-13-2 / Procurement of hardware for newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Canceled 2020-02-13 2020-03-11 2020-02-18 2020-03-11 2020-03-16 2020-04-01 2020-04-30 2020-06-04 2020-09-02 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP KG-G/RFB-04A-2 / Development of Routine Strengthening Disaster Single Stage - One Management Body - Crisis IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2020-02-18 2020-02-07 2020-02-21 2020-02-07 2020-04-06 2020-05-11 2020-06-08 2020-10-06 Envelope Management Center: Purchase Systems of satellite equipment KG-G/RFB-06Е-2 / Strengthening Disaster Single Stage - One Procurement of measuring IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2020-03-10 2020-03-13 2020-03-13 2020-03-13 2020-04-30 2020-06-30 2020-06-19 2020-07-17 2020-11-14 Envelope equipment Systems KG-G/RFB-06F-2 / Strengthening Disaster Procurement of a mobile Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 57,208.80 Completed 2020-03-23 2020-06-04 2020-03-25 2020-06-05 2020-05-14 2020-07-27 2020-07-03 2020-08-27 2020-07-31 2020-09-14 2020-11-28 2021-01-12 weather station and forecast Envelope Systems equipment KG/ERIK-CERC/G/RFQ/2020- 01 / Personal Protective Equipment for RRTs, 24 Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 0.00 Canceled 2020-04-07 2020-04-06 2020-04-19 2020-05-19 designated quarantine Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 02 / Disinfectants for RRTs, Contingent Emergency Request for Single Stage - One 24 designated quarantine IDA / 62380 Post Open - International 0.00 Canceled 2020-04-07 2020-04-06 2020-04-19 2020-05-19 Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 03 / Laboratory reagents needed for diagnosis for Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 71,415.39 Signed 2020-04-07 2020-04-06 2020-05-19 2020-04-29 2020-11-15 2020-05-22 RRTs, 24 designated Response Quotations Envelope quarantine hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 04 / Lifesaving essential drugs for diagnosis for RRTs, Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 749,828.10 Completed 2020-04-07 2020-04-06 2020-05-19 2020-04-23 2020-11-15 2020-07-06 24 designated quarantine Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 05 / Medical devices for diagnosis for RRTs, 24 Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 2,510.00 Completed 2020-04-07 2020-04-06 2020-04-19 2020-04-23 2020-05-19 2020-06-29 designated quarantine Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 09 / Procurement of 13 fully Contingent Emergency Request for Single Stage - One equipped ambulances - IDA / 62380 Post Open - International 764,900.00 Completed 2020-04-07 2020-04-06 2020-04-19 2020-04-22 2020-06-18 2020-09-01 Response Quotations Envelope Advanced Life Support (ALS) vehicles KG/ERIK-CERC/G/RFQ/2020- 06 / Medical equipment for diagnosis for RRTs, 24 Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 571,333.53 Completed 2020-04-07 2020-04-06 2020-04-19 2020-04-28 2020-06-18 2020-10-14 designated quarantine Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 08 / Other products (paper Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 0.00 Canceled 2020-04-07 2020-04-06 2020-04-19 2020-05-19 towels, shipping containers, Response Quotations Envelope etc.) KG/ERIK-CERC/G/RFQ/2020- Contingent Emergency Request for Single Stage - One 07 / Respiratory Support IDA / 62380 Post Open - International 1,431,298.56 Completed 2020-04-07 2020-04-06 2020-04-19 2020-05-07 2020-06-18 2020-10-21 Response Quotations Envelope Equipment Page 3 KG/ERIK-CERC/G/RFQ/2020- 01B / PPEs for RRTs, 24 Contingent Emergency Request for Single Stage - One designated quarantine IDA / 62380 Post Open - International 330,763.38 Completed 2020-04-17 2020-04-17 2020-04-29 2020-05-08 2020-05-29 2020-08-03 Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals - 2 lots KG/ERIK-CERC/G/RFQ/2020- 02B / Disinfectants for RRTs, Contingent Emergency Request for Single Stage - One 24 designated quarantine IDA / 62380 Post Open - International 33,803.70 Completed 2020-04-17 2020-04-17 2020-04-29 2020-04-30 2020-05-29 2020-05-18 Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 08B / Other products (paper Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 6,157.70 Signed 2020-04-17 2020-04-17 2020-04-29 2020-05-08 2020-05-29 2020-07-19 towels, liquid soap, shipping Response Quotations Envelope containers, etc.) G/ERIK-CERC/G/RFQ/2020- 05B / Medical devices for diagnosis for RRTs, 24 designated quarantine Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 21,614.87 Completed 2020-04-20 2020-04-20 2020-05-02 2020-05-04 2020-06-01 2020-06-01 hospitals, PHC, ICUs and Response Quotations Envelope designated hospitals - Lot No 2 - Consumables for medicament injection KG/ERIK-CERC/G/RFQ/2020- 04B / Procurement of lifesaving essential drugs for Contingent Emergency Request for Single Stage - One diagnosis for RRTs, 24 IDA / 62380 Post Open - International 152,657.78 Completed 2020-04-23 2020-04-23 2020-05-05 2020-05-04 2020-06-04 2020-06-04 Response Quotations Envelope designated quarantine hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 03B / Laboratory reagents needed for diagnosis for Contingent Emergency Request for Single Stage - One RRTs, 24 designated IDA / 62380 Post Open - International 0.00 Canceled 2020-05-11 2020-05-11 2020-06-24 2020-07-24 Response Quotations Envelope quarantine hospitals, PHC, ICUs and designated hospitals -Lot No 1 KG-G/DC-02 / Procurement Enhancing Financial of database of residential IDA / 62380 Post Direct Selection Direct 0.00 Canceled 2020-05-10 2020-05-27 2020-05-15 2020-05-28 2020-05-25 2020-07-24 Protection properties for SIO KG/ERIK-CERC/G/RFQ/2020- 06B / Medical equipment for diagnosis for RRTs, 24 Contingent Emergency Request for IDA / 62380 Post 63,213.67 Completed 2020-05-18 2020-05-19 2020-06-09 2020-08-11 2020-08-08 2020-12-17 designated quarantine Response Quotations hospitals, PHC, ICUs and designated hospitals. KG/ERIK-CERC/G/RFQ/2020- 10 / Procurement of Contingent Emergency Request for Single Stage - One equipment for disinfection IDA / 62380 Post Open - International 196,854.00 Completed 2020-05-26 2020-05-28 2020-06-22 2020-07-07 2020-08-21 2020-11-13 Response Quotations Envelope and reduction of medical waste KG-G/RFB-13-2B / Procurement of hardware for newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Canceled 2020-06-22 2020-06-22 2020-06-25 2020-06-22 2020-07-25 2020-07-15 2020-08-29 2020-08-28 2020-09-08 2020-12-07 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP KG/ERIK- CERC/G/UNA/2020/1 / Contingent Emergency UN Agencies Procurement of Personel IDA / 62380 Post Direct 460,978.76 Completed 2020-07-01 2020-06-25 2020-07-03 2020-06-24 2020-07-10 2020-06-25 2020-08-29 2020-10-26 Response (Direct) Protective Equipment and medical drugs KG/ERIK-CERC/G/DC/2020- 02 / Procurement of lifesaving Contingent Emergency IDA / 62380 Post Direct Selection Direct 70,575.11 Completed 2020-07-01 2020-06-30 2020-07-01 2020-07-01 2020-07-04 2020-07-04 2020-07-29 2020-08-21 essential drugs for RRTs of Response health care organizations KG/ERIK-CERC/G/DC/2020- 03 / Procurement of lifesaving Contingent Emergency IDA / 62380 Post Direct Selection Direct 843,411.22 Completed 2020-07-01 2020-06-30 2020-07-01 2020-07-01 2020-07-04 2020-07-04 2020-07-29 2020-07-18 essential drugs for RRTs of Response health care organizations KG/ERIK-CERC/G/DC/2020- 04 / Procurement of lifesaving Contingent Emergency IDA / 62380 Post Direct Selection 52,596.49 Completed 2020-07-01 2020-06-30 2020-07-01 2020-07-01 2020-07-04 2020-07-04 2020-07-06 2020-07-21 essential drugs for RRTs of Response health care organizations KG/ERIK-CERC/G/DC/2020- 05 / Procurement of lifesaving Contingent Emergency IDA / 62380 Post Direct Selection Direct 9,465.82 Completed 2020-07-01 2020-06-30 2020-07-01 2020-07-04 2020-07-04 2020-07-04 2020-07-29 2020-07-07 essential drugs for RRTs of Response health care organizations KG/ERIK-CERC/G/RFQ/2020- 03B-2 / Purchase of Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 181,860.95 Completed 2020-07-13 2020-07-08 2020-08-08 2020-08-11 2020-09-07 2020-09-21 consumables for polymerase Response Quotations Envelope chain reaction (PCR) analysis KG/ERIK-CERC/G/RFQ/2020- 10-2 / Procurement of Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 632,322.65 Completed 2020-07-15 2020-07-09 2020-08-15 2020-08-21 2020-11-13 2020-12-14 Microwave equipment for Response Quotations Envelope disinfection of medical waste KG/ERIK-CERC/G/DC/2020- 01 / Procurement of lifesaving Contingent Emergency essential drugs for diagnosis IDA / 62380 Post Direct Selection Direct 4,056.78 Completed 2020-07-08 2020-06-30 2020-07-08 2020-07-01 2020-07-09 2020-07-09 2020-08-03 2020-07-15 Response for RRTs of health care organization KG-G/RFQ-14 / Procurement Enhancing Financial Request for Single Stage - One of mobile devices for OJSC IDA / 62380 Post Open - International 90,477.34 Completed 2020-08-20 2020-08-27 2020-10-14 2020-10-21 2020-12-13 2021-01-15 Protection Quotations Envelope State Insurance Organization Page 4 KG/ERIK-CERC- COVID19/G/RFB/2020-01 / Contingent Emergency Single Stage - One IDA / 62380 Prior Request for Bids Open - International 0.00 Canceled 2020-08-21 2020-08-23 2020-08-28 2020-08-25 2020-09-14 2020-09-09 2020-10-29 2020-11-24 2021-03-24 Procurement of computer Response Envelope tomographs KG-G/DC-02-2 / Procurement of database of Enhancing Financial residential properties for IDA / 62380 Post Direct Selection Direct 28,740.25 Signed 2020-09-10 2020-09-04 2020-09-15 2020-09-04 2020-10-13 2020-09-16 2020-12-12 Protection OJSC "State Insurance Organization" Strengthening Disaster KG-G/DC-03 / Procurement IDA / 62380 Preparedness and Response Post Direct Selection Direct 37,734.28 Completed 2020-09-10 2020-09-08 2020-09-24 2020-09-08 2020-10-29 2020-10-21 2021-01-27 2021-03-16 of measuring equipment Systems KG-G/RFQ-06/AF / Project Management and Request for Single Stage - One Procurement of Office IDA / 66870 Post Open - National 3,314.50 Completed 2020-12-15 2020-11-27 2021-04-01 2021-01-12 2021-06-10 2021-02-03 Monitoring & Evaluation Quotations Envelope Furniture for PIU KG-G/RFQ-07/AF / Office Project Management and Request for Single Stage - One IDA / 66870 Post Open - National 0.00 Canceled 2020-12-01 2020-11-27 2021-03-18 2021-05-27 Equipment for PIU Monitoring & Evaluation Quotations Envelope KG-G/RFB-06/AF / Project Management and Single Stage - One IDA / 66870 Post Request for Bids Open - National 0.00 Canceled 2020-11-26 2020-12-01 2021-01-15 2021-02-14 2021-03-28 2021-07-26 Procurement cars for PIU Monitoring & Evaluation Envelope KG-G/RFB-02/AF / Strengthening Disaster Pending Procurement of necessary fire Single Stage - One IDA / 66870 Preparedness and Response Post Request for Bids Open - International 0.00 Implementati 2022-07-15 2022-08-12 2022-09-26 2022-11-25 2023-01-27 2023-04-27 extinguishing means and Envelope Systems on other equipment KG-G/RFB-04/AF / Improving Safety and Pending Single Stage - One Procurement of Furniture for IDA / 66870 Functionality of School Post Request for Bids Open - International 0.00 Implementati 2023-03-01 2023-03-29 2023-05-13 2023-08-02 2023-09-13 2024-04-10 Envelope 10 schools Infrastructure on KG-G/RFB-05/AF / Improving Safety and Pending Single Stage - One Procurement of Furniture for IDA / 66870 Functionality of School Prior Request for Bids Open - International 0.00 Implementati 2024-03-01 2024-03-29 2024-05-13 2024-08-02 2024-09-13 2025-04-11 Envelope 20 schools Infrastructure on KG-G/RFB-03/AF / Improving Safety and Pending Single Stage - One Improving IT infrastructure of IDA / 66870 Functionality of School Post Request for Bids Open - International 0.00 Implementati 2021-09-01 2021-09-29 2021-11-13 2022-02-02 2022-03-16 2022-09-12 Envelope the MOeS Infrastructure on KG-G/RFB-13-2C / Procurement of hardware for newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - National 65,562.40 Signed 2020-10-22 2020-11-25 2020-10-27 2020-11-25 2020-11-17 2020-12-15 2020-12-27 2020-12-22 2021-01-06 2021-01-21 2021-04-06 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP KG-G/RFB-01/AF / Procurement of vehicles Lot Strengthening Disaster Single Stage - One No 1 - Firefighting vehicle; IDA / 66870 Preparedness and Response Prior Request for Bids Open - International 0.00 Canceled 2021-07-15 2021-08-12 2021-09-26 2021-12-16 2022-01-27 2023-01-27 Envelope Lot No 2- Feet maintaining Systems vehicles KG-G/RFB-13A / Strengthening Disaster Single Stage - One Procurement of hardware for IDA / 62380 Preparedness and Response Post Request for Bids Open - International 176,861.06 Signed 2020-11-20 2020-12-03 2020-11-25 2020-12-03 2021-01-11 2021-01-20 2021-02-25 2021-03-23 2021-03-25 2021-04-16 2021-07-23 Envelope Web portal of the USCEMF Systems KG-G/RFQ-07/AF-2 / Project Management and Request for Single Stage - One Procurement of office IDA / 66870 Post Open - National 11,839.09 Completed 2020-12-25 2021-06-07 2021-02-16 2021-08-16 2021-03-27 Monitoring & Evaluation Quotations Envelope equipment for PIU KG-G/RFB-06/AF-2 / Project Management and Single Stage - Two IDA / 66870 Post Request for Bids Open - National 0.00 Canceled 2020-10-15 2020-12-11 2020-10-20 2020-12-10 2020-11-24 2021-01-05 2021-02-08 2021-02-25 2021-06-25 Procurement of cars for PIU Monitoring & Evaluation Envelope KG-G/RFB-06/AF-4 / Pending Project Management and Single Stage - One Procurement of vehicles for IDA / 66870 Post Request for Bids Open - National 0.00 Implementati 2021-10-01 2021-10-01 2021-11-15 2021-12-15 2022-01-05 2022-04-05 Monitoring & Evaluation Envelope PIU on KG-G/RFB-06/AF-3 / Project Management and Single Stage - One IDA / 66870 Post Request for Bids Open - National 29,413.01 Completed 2021-01-25 2021-01-22 2021-01-30 2021-01-22 2021-02-17 2021-02-09 2021-03-03 2021-03-11 2021-03-20 2021-03-17 2021-06-18 2021-04-04 Procurement of vehicle for PIU Monitoring & Evaluation Envelope Strengthening Disaster Under KG-G/RFB-01/AF-2 / Single Stage - Two IDA / 66870 Preparedness and Response Prior Request for Bids Open - International 0.00 Implementati 2021-02-19 2021-04-09 2021-03-19 2021-04-14 2021-05-10 2021-08-20 2021-09-17 2022-09-17 Procurement of vehicles Envelope Systems on KG-G/RFB-16/ERIK / Development of Routine Strengthening Disaster Under Single Stage - One Management Body (CMC): IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Implementati 2021-03-23 2021-03-30 2021-03-26 2021-03-30 2021-04-16 2021-04-19 2021-05-31 2021-05-07 2021-06-17 2021-10-15 Envelope Procurement of radio Systems on equipment KG-G/RFB-17/ERIK / Strengthening Disaster Under Procurement of land surveying Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Implementati 2021-05-28 2021-05-20 2021-05-31 2021-05-20 2021-06-21 2021-08-05 2021-08-22 2021-12-20 equipment for USCEMF Envelope Systems on (software and UAV) KG-G/RFB-18/ERIK / Strengthening Disaster Under Single Stage - One Procurement of land surveying IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Implementati 2021-05-03 2021-05-20 2021-05-06 2021-05-20 2021-05-27 2021-07-11 2021-07-28 2021-11-25 Envelope equipment for USCEMF (GNSS) Systems on KG-G/RFB-19/ERIK / Strengthening Disaster Under Single Stage - One Procurement of measuring IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Implementati 2021-06-01 2021-05-20 2021-06-04 2021-05-20 2021-06-25 2021-08-09 2021-08-26 2021-12-24 Envelope equipment for USCEMF Systems on KG-G/RFB-20/ERIK / Capacity building of the Emergency Monitoring and Strengthening Disaster Pending Single Stage - One Forecasting Center: IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Implementati 2021-06-01 2021-06-04 2021-06-25 2021-08-09 2021-08-26 2021-12-24 Envelope Procurement of office Systems on equipment and engineering infrastructure (furniture) Page 5 KG-G/RFQ-15/ERIK / Procurement of hardware for Strengthening Disaster Pending Request for Single Stage - One newly created 15 cluster IDA / 62380 Preparedness and Response Post Open - National 0.00 Implementati 2021-05-20 2021-07-16 2021-08-30 Quotations Envelope interdistrict points of ES Systems on monitoring KG-G/RFB-21/ERIK / Strengthening Disaster Under Procurement of special vehicle Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Implementati 2021-05-18 2021-05-20 2021-05-21 2021-05-20 2021-06-11 2021-07-26 2021-08-12 2022-01-09 (operational research Envelope Systems on laboratory of MoES) KG/ERIK-CERC- Under COVID19/G/RFB/2021-02 / Contingent Emergency Single Stage - Two IDA / 62380 Prior Request for Bids Open - International 0.00 Implementati 2021-06-01 2021-06-22 2021-06-22 2021-06-24 2021-08-06 2021-10-19 2021-11-16 2022-03-16 Procurement of computed Response Envelope on tomography Strengthening Disaster Pending KG-G/RFB-07 / Scaling-up of Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Implementati 2021-01-25 2021-02-01 2021-03-18 2021-04-15 2021-05-13 2021-11-09 the operational monitoring Envelope Systems on KG-G/RFB-22/ERIK / Strengthening Disaster Pending Procurement of Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Implementati 2021-06-15 2021-06-18 2021-08-02 2021-10-01 2021-11-05 2022-02-03 communication devices for Envelope Systems on development of UIMS Under KG-G/RFB-06/AF-1 / Project Management and Request for Single Stage - One IDA / D6550 Post Open - National 0.00 Implementati 2021-06-12 2021-06-02 2021-08-07 2022-02-03 Procurement for car for PIU Monitoring & Evaluation Quotations Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-G/RFB-06B / Strengthening Disaster Single Stage - One Procurement of Digital terrain IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-04-05 2019-04-12 2019-05-24 2019-06-21 2019-08-02 2019-12-20 Envelope model (DTM) and Systems orthophotographs CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-CS/QCBS-02 / Business process review for Enhancing Financial Quality And Cost- IDA / V1060 Prior Open - International 1,333,333.33 Signed 2018-03-15 2018-03-25 2018-04-14 2018-05-11 2018-05-12 2018-06-25 2018-06-09 2018-07-25 2018-06-29 2018-09-12 2018-08-03 2018-11-26 2018-09-18 2018-12-26 2020-09-17 catastrophe insurance and Protection Based Selection supporting IT customization services KG-CS/LCS-01 / Financial Least Cost audit (annual) of project for / Post Open - International 0.00 Canceled 2018-02-25 2018-03-03 2018-03-27 2018-04-24 2018-05-22 2018-06-11 2018-07-09 2018-07-23 2019-12-31 Selection 2018-2020 KG-CS/QCBS-01 / Preparation of Feasibility Studies and Designs for Quality And Cost- Improved Seismic Safety and / Prior Open - International 0.00 Canceled 2018-04-25 2018-05-25 2018-06-22 2018-07-20 2018-08-09 2018-09-13 2018-10-29 2020-10-28 Based Selection Energy Efficiency of Schools and Technical Supervision of construction. KG-CS/QCBS-01/2 / Preparation of Feasibility Studies and Designs for Improving Safety and Quality And Cost- Improved Seismic Safety and IDA / V1060 Functionality of School Post Open - International 0.00 Canceled 2020-03-02 2020-03-23 2020-04-27 2020-06-08 2020-06-28 2020-08-02 2020-09-11 2021-04-09 Based Selection Energy Efficiency of Schools Infrastructure and Technical Supervision of construction. KG-CS/LCS-01/A / Financial Project Management and Least Cost IDA / 62380 Post Open - International 76,832.00 Signed 2019-01-18 2019-02-05 2019-02-03 2019-02-08 2019-02-24 2019-03-06 2019-03-24 2019-04-03 2019-04-07 2019-04-10 2019-04-22 2019-04-19 2019-05-13 2019-05-17 2024-01-31 audit of project (annual) Monitoring & Evaluation Selection KG-CS/QCBS-01/1 / Preparation of Feasibility Improving Safety and Studies and Designs for Quality And Cost- IDA / V1060 Functionality of School Prior Open - International 596,999.33 Signed 2019-06-28 2020-01-16 2019-07-12 2020-02-03 2019-08-12 2020-08-11 2019-09-11 2020-09-28 2019-10-09 2021-01-15 2019-11-13 2021-04-23 2019-12-18 2021-05-24 2020-12-17 Improved Seismic Safety and Based Selection Infrastructure Energy Efficiency of Schools and Author supervision KG-CS/QCBS-01/3 / Preparation of Feasibility Improving Safety and Studies and Designs for Quality And Cost- IDA / V1060 Functionality of School Prior Open - International 0.00 Canceled 2020-07-28 2020-08-27 2020-09-27 2020-10-27 2020-11-24 2020-12-29 2021-02-02 2022-10-25 Improved Seismic Safety and Based Selection Infrastructure Energy Efficiency of Schools and Author supervision Improving Safety and Consultant KG-CS/CQS-02 / Supervision IDA / V1060 Functionality of School Post Qualification Open - National 0.00 Canceled 2021-04-01 2021-04-15 2021-05-13 2021-05-27 2021-07-03 2022-06-28 and monitoring Infrastructure Selection Improving Safety and KG-CS/QCBS-05 / Quality And Cost- Pending IDA / V1060 Functionality of School Prior Open - International 0.00 2021-02-02 2021-02-23 2021-04-08 2021-05-06 2021-06-05 2021-07-10 2021-08-14 2022-12-27 Supervision and monitoring Based Selection Implementation Infrastructure KG-CS/CQS-03 / Strengthening Disaster Consultant Establishing a Platform to IDA / 62380 Preparedness and Response Post Qualification Open - International 131,370.00 Signed 2019-08-05 2019-08-27 2019-08-26 2019-09-06 2019-10-09 2019-12-02 2019-10-16 2020-02-25 2019-11-13 2020-03-17 2020-02-11 Exchange the Data Systems Selection KG-CS/QCBS-03 / Enhancing Financial Quality And Cost- Pending Optimisation of SIO core IDA / 62380 Prior Open - International 0.00 2020-10-01 2020-10-15 2020-12-10 2021-01-07 2021-02-06 2021-03-03 2021-04-18 2022-04-18 Protection Based Selection Implementation business processes KG-CS/CQS-04 / Risk Consultant Enhancing Financial Pending management and regulatory IDA / 62380 Post Qualification Open - International 0.00 2020-10-15 2020-10-29 2020-12-14 2021-01-25 2021-03-01 2021-03-13 Protection Implementation compliance Selection Page 6 KG-CS/QCBS-01/AF / Preparation of Feasibility Studies and Designs for Improving Safety and Quality And Cost- Pending Improved Seismic Safety and IDA / 66870 Functionality of School Prior Open - International 0.00 2020-12-25 2021-01-01 2021-02-27 2021-04-13 2021-05-04 2021-06-15 2021-08-10 2022-08-10 Based Selection Implementation Energy Efficiency of Schools Infrastructure and Author supervision for 10 schools KG-CS/QCBS-03/AF / Preparation of Feasibility Studies and Designs for Improving Safety and Quality And Cost- Pending Improved Seismic Safety and IDA / 66870 Functionality of School Prior Open - International 0.00 2021-12-25 2022-01-01 2022-03-01 2022-04-15 2022-05-06 2022-06-17 2022-08-12 2023-08-12 Based Selection Implementation Energy Efficiency of Schools Infrastructure and Author supervision for 20 schools KG-CS/LCS-01/AF / Financial Project Management and Least Cost Pending IDA / 66870 Post Open - International 0.00 2021-04-16 2021-05-01 2021-06-28 2021-07-26 2021-08-15 2021-09-05 2021-10-09 2025-09-28 audit (annual) - 2021-2027 Monitoring & Evaluation Selection Implementation KG-CS/QCBS-02/AF / Improving Safety and Quality And Cost- Pending Technical supervision for 10 IDA / 66870 Functionality of School Prior Open - International 0.00 2022-08-18 2022-09-15 2022-10-28 2022-12-12 2023-01-02 2023-02-13 2023-04-10 2024-04-09 Based Selection Implementation schools Infrastructure KG-CS/QCBS-04/AF / Improving Safety and Quality And Cost- Pending Technical supervision for 20 IDA / 66870 Functionality of School Prior Open - International 0.00 2023-09-01 2023-09-15 2023-10-26 2023-12-10 2023-12-31 2024-02-04 2024-04-07 2025-04-07 Based Selection Implementation schools Infrastructure KG-CS/CQS-01/AF / Strengthening Disaster Consultant Pending Development of Fire Service IDA / 66870 Preparedness and Response Post Qualification Open - International 0.00 2021-11-01 2021-11-22 2022-01-05 2022-01-21 2022-02-25 2022-08-24 Implementation Program Systems Selection KG-CS/CQS-02/AF / Improving Safety and Consultant Development of special Pending IDA / 66870 Functionality of School Post Qualification Open - National 0.00 2021-01-01 2021-01-22 2021-02-21 2021-03-14 2021-04-27 2021-10-24 technical conditions for 30 Implementation Infrastructure Selection schools KG-CS/CQS-03/AF / Improving Safety and Consultant Pending Development of IDA / 66870 Functionality of School Post Qualification Open - National 0.00 2021-01-01 2021-01-22 2021-03-07 2021-04-06 2021-04-27 2025-08-31 Implementation communication strategy Infrastructure Selection KG-CS/CQS-05 / Expansion of the activities of the web Strengthening Disaster Consultant portal of the USCEMF: Pending IDA / 62380 Preparedness and Response Post Qualification Open - International 0.00 2021-06-17 2021-07-01 2021-07-29 2021-08-26 2021-09-09 2021-12-08 Development of software to Implementation Systems Selection expand the activities of the USCEMF web portal INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-IOC/IC-07 / Local Individual Project Management and Coordinator for the IDA / V1060 Post Consultant Open 12,731.86 Completed 2018-02-15 2018-02-15 2018-03-29 2018-04-02 2018-03-30 2018-04-02 2018-04-17 2018-04-16 2020-04-06 2019-04-30 Monitoring & Evaluation Component 1 Selection KG-IOC/IC-08 / Local Individual Project Management and Coordinator for the IDA / V1060 Post Consultant Open 11,086.74 Completed 2018-02-15 2018-02-19 2018-03-29 2018-04-25 2018-03-30 2018-04-28 2018-04-17 2018-05-14 2020-04-06 2019-04-30 Monitoring & Evaluation Component 2 Selection KG-IOC/IC-09 / Local Individual Project Management and Coordinator for the IDA / V1060 Post Consultant Open 13,404.13 Completed 2018-02-15 2018-02-15 2018-03-29 2018-04-04 2018-03-30 2018-04-06 2018-04-17 2018-04-23 2020-04-06 2019-04-30 Monitoring & Evaluation Component 3 Selection Individual KG-IOC/IC-03 / Local Project Management and IDA / V1060 Prior Consultant Direct 20,923.36 Completed 2018-02-15 2018-03-02 2018-03-08 2018-03-19 2018-03-22 2018-04-04 2018-03-29 2018-04-01 2019-11-19 2019-04-30 Financial Manager Monitoring & Evaluation Selection Individual KG-IOC/IC-04 / Local Project Management and IDA / V1060 Post Consultant Open 11,986.87 Completed 2018-02-15 2018-02-19 2018-03-20 2018-04-03 2018-03-22 2018-04-03 2018-04-08 2018-04-18 2019-04-03 2019-04-30 Disbursment Specialist Monitoring & Evaluation Selection KG-IOC/IC-05 / Local Individual Project Management and assistant of Procurement IDA / V1060 Post Consultant Open 4,791.60 Terminated 2018-02-15 2018-02-19 2018-03-29 2018-04-03 2018-03-30 2018-04-05 2018-04-19 2018-04-16 2019-04-14 Monitoring & Evaluation Specialist Selection Individual KG-IOC/IC-06 / Local Project Management and IDA / V1060 Post Consultant Open 8,286.74 Terminated 2018-02-15 2018-02-19 2018-03-29 2018-04-02 2018-03-30 2018-04-02 2018-04-19 2018-04-16 2019-04-14 Translator-office-manager Monitoring & Evaluation Selection Individual KG-CS/IC-02 / Selection of Project Management and / Post Consultant Limited 3,235.30 Terminated 2017-12-29 2018-01-09 2017-12-30 2018-01-17 2018-01-05 2018-01-23 2018-01-17 2018-02-28 Local Social Consultant Monitoring & Evaluation Selection KG-CS/IC-01 / Selection of Individual Local Environmental / Post Consultant Limited 3,970.59 Completed 2017-12-29 2018-01-30 2017-12-31 2018-01-17 2018-01-05 2018-01-22 2018-01-17 2018-02-04 2018-02-28 2018-04-06 Consultant Selection Individual KG-IOC/IC-02 / Local Senior Project Management and IDA / V1060 Prior Consultant Direct 13,575.10 Terminated 2018-02-22 2018-03-02 2018-02-22 2018-03-19 2018-02-22 2018-04-04 2018-04-01 2018-04-01 2019-11-22 Procurement Specialist Monitoring & Evaluation Selection Individual KG-MES-54500-CS-INDV / Project Management and IDA / V1060 Prior Consultant Limited 14,390.21 Completed 2018-03-19 2018-03-22 2018-03-19 2018-04-06 2018-04-02 2018-04-24 2018-04-26 2018-05-16 2019-04-21 2019-04-30 Local Director PIU Monitoring & Evaluation Selection Individual KG-IOC/IC-01 / Local / Prior Consultant Open 0.00 Canceled 2018-02-15 2018-02-19 2018-03-29 2018-04-12 2018-05-17 2020-05-06 Director PIU Selection KG-CS/IC-03 / Selection of Local Consultant for Individual preparation of bidding / Post Consultant Open 0.00 Canceled 2018-04-15 2018-05-27 2018-06-10 2018-06-24 2019-06-19 documents for goods for Selection MoES Page 7 KG-CS/IC-03-2 / Local IT Consultant for preparation of Individual Project Management and bidding documents for IDA / V1060 Post Consultant Limited 0.00 Canceled 2018-05-10 2018-05-15 2018-06-05 2018-07-03 2019-07-03 Monitoring & Evaluation Component #1 and Selection Component #3 KG-CS/IC-03/1 / Local Individual Consultant for Business Project Management and IDA / V1060 Post Consultant Open 12,778.57 Completed 2018-06-21 2018-06-21 2018-07-30 2018-08-06 2018-08-02 2018-08-06 2018-08-21 2018-08-22 2019-08-21 2019-08-21 Processes and Information Monitoring & Evaluation Selection Technologies Improving Safety and Individual KG-CS/IC-04 / International IDA / V1060 Functionality of School Post Consultant Open 0.00 Canceled 2018-10-26 2018-12-05 2018-12-21 2019-01-09 2020-12-29 Сivil engineer Infrastructure Selection Improving Safety and Individual KG-CS/IC-04/A / Local civil IDA / 62380 Functionality of School Post Consultant Open 26,288.61 Terminated 2019-02-17 2019-03-01 2019-03-14 2019-04-10 2019-03-21 2019-04-24 2019-04-11 2019-04-25 2020-04-10 engineer Infrastructure Selection Improving Safety and Individual KG-CS/IC-05 / Local Social & IDA / 62380 Functionality of School Post Consultant Open 0.00 Canceled 2019-02-27 2019-02-25 2019-04-04 2019-04-10 2019-04-11 2019-05-02 2020-05-01 Environment Consultant Infrastructure Selection Strengthening Disaster Individual KG-CS/IC-07 / Local IT IDA / V1060 Preparedness and Response Post Consultant Open 5,213.26 Terminated 2019-03-25 2019-04-10 2019-04-19 2019-06-04 2019-04-22 2019-05-31 2019-05-10 2019-06-19 2020-05-09 Consultant for MES KR Systems Selection KG-CS/IC-09 / Local Improving Safety and Individual Translator Consultant for IDA / 62380 Functionality of School Post Consultant Open 0.00 Canceled 2019-03-25 2019-04-02 2019-04-11 2019-06-28 2019-04-12 2019-04-29 2020-04-28 Component #2 Infrastructure Selection KG-CS/IC-10 / Local Individual Enhancing Financial Translator Consultant for IDA / 62380 Post Consultant Open 0.00 Canceled 2019-03-25 2019-04-02 2019-04-11 2019-07-02 2019-04-12 2019-04-29 2020-04-28 Protection Component #3 Selection Improving Safety and Individual KG-CS/IC-05-2 / Local IDA / 62380 Functionality of School Post Consultant Limited 18,631.04 Terminated 2019-05-03 2019-05-15 2019-05-10 2019-05-21 2019-05-24 2019-05-31 2019-06-14 2019-07-04 2020-06-13 Social&Enviroment Consultant Infrastructure Selection KG-CS/IC-08 / Local Strengthening Disaster Individual Translator Consultant for IDA / 62380 Preparedness and Response Post Consultant Open 0.00 Canceled 2019-03-25 2019-04-02 2019-04-11 2019-07-17 2019-04-12 2019-04-29 2020-04-28 Component #1 Systems Selection KG-CS/IC-03/2 / Local Individual Consultant for Business Enhancing Financial IDA / 62380 Post Consultant Direct 12,808.23 Completed 2019-08-21 2019-09-06 2019-08-21 2019-08-20 2019-08-21 2019-08-20 2019-08-22 2019-08-20 2020-08-31 2020-08-31 Processes and Information Protection Selection Technologies KG/CS/SSS-01/SDC / Improving Safety and Development of special IDA / 62380 Functionality of School Post Direct Selection Direct 48,252.84 Signed 2020-07-01 2020-06-24 2020-07-15 2020-07-23 2020-09-09 2020-09-25 2020-11-08 design criteria Infrastructure Strengthening Disaster Individual KG-CS/IC-07/B / Local IT IDA / 62380 Preparedness and Response Post Consultant Open 10,085.87 Signed 2020-05-22 2020-06-12 2020-06-20 2020-08-24 2020-07-04 2020-08-24 2020-07-07 2020-09-09 2021-07-07 Consultant for MES Systems Selection KG-CS/IC-03/3 / Local Individual Consultant for Business Enhancing Financial IDA / 62380 Post Consultant Direct 25,809.03 Signed 2020-08-28 2020-08-24 2020-08-31 2020-08-25 2020-08-31 2020-08-25 2020-09-01 2020-09-01 2021-03-31 Processes and Information Protection Selection Technologies KG-CS/IC-01/AF / Improving Safety and Individual Communications Strategy IDA / 66870 Functionality of School Post Consultant Open 10,522.20 Signed 2020-10-26 2020-10-13 2020-12-02 2021-01-11 2020-12-09 2021-01-11 2020-12-30 2021-01-25 2025-08-31 Specialist Infrastructure Selection Strengthening Disaster Individual KG-CS/IC-02/AF / Fire Safety IDA / 66870 Preparedness and Response Post Consultant Open 0.00 Canceled 2020-10-27 2020-12-10 2020-12-17 2020-12-31 2021-12-31 Specialist Systems Selection KG-CS/IC-11 / Local Improving Safety and Individual Сonsultant Engineer on IDA / 62380 Functionality of School Post Consultant Open 8,992.22 Signed 2021-02-03 2021-02-03 2021-03-17 2021-03-12 2021-03-24 2021-03-12 2021-03-27 2021-04-01 2021-07-25 energy efficiency Infrastructure Selection KG-CS/IC-12 / Local Improving Safety and Individual Сonsultant Engineer on IDA / 62380 Functionality of School Post Consultant Open 8,992.22 Signed 2021-02-03 2021-02-03 2021-03-17 2021-03-12 2021-03-24 2021-03-12 2021-03-27 2021-04-01 2021-07-25 energy efficiency Infrastructure Selection KG-CS/IC-13 / Local Improving Safety and Individual Consultant on water supply IDA / 62380 Functionality of School Post Consultant Open 0.00 Canceled 2021-02-03 2021-02-03 2021-03-17 2021-03-12 2021-03-24 2021-03-27 2021-07-25 and sanitation Infrastructure Selection KG-CS/IC-13-2 / Local Improving Safety and Individual Consultant on water supply IDA / 62380 Functionality of School Post Consultant Limited 8,994.63 Signed 2021-03-30 2021-03-30 2021-04-13 2021-04-05 2021-04-27 2021-04-15 2021-05-11 2021-04-30 2021-09-08 and sanitation Infrastructure Selection Improving Safety and Individual KG-CS/IC-03/AF / IT Under IDA / 66870 Functionality of School Post Consultant Open 0.00 2021-04-01 2021-03-30 2021-05-06 2021-05-13 2021-05-27 2023-05-27 Consultant for Component 2 Implementation Infrastructure Selection Page 8 SUMMARY O F PROCUREMENT PLAN Project Preparation Advancement (PPA) Project information: Harmonizing and Improving Statistics in West Africa Project -P169265 Project Implementation agency: Liberia Institute of Statistics and Geo- Information Services (LISGIS) Date of the Procurement Plan: February 3, 2020 Period covered by this Procurement Plan: 3rd February to 31st July 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 1, 2016), revised in November 2017, and August 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the Regional Project for Statistics Thresholds*, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] All contracts at or above USD Open Competition 5,000,000 are subject to International Market 1 Works C ≥ 5,000,000 Approach and Direct international advertising and the use of the Bank’s SPDs (or other Contracting documents agreed with the Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Bank). Open Competition National Market 200,000 < C < 5,000,000 None Approach C ≤ 200,000 RfQ None All contracts at or above USD Open Competition 500,000 are subject to International Market international advertising and the C ≥ 500,000 Approach and Direct use of the Bank’s SPDs (or other Goods, IT and Contracting documents agreed with the 2 non-consulting Bank). services Open Competition 100,000 < C < 500,000 National Market None Approach C ≤ 100,000 RfQ None All contracts at or above USD 100,000 are subject to for international advertising and the C < 100,000 Consulting Services use of the Bank’s SPDs (or other National documents agreed with the shortlist for Bank). 3 selection of All contracts at or above USD consultant firms for 200,000 are subject to Engineering and international advertising and the C ≤ 200,000 Construction use of the Bank’s SPDs (or other Supervision documents agreed with the Bank). Selection of All values ≥ 100,000 4 Individual All Approaches consultants Training, This line activity is not subject to Workshops, Based on approved Procurement Review However, 5 Study Tours All Values Annual Work Plan & each of the activities will be Budgets (AWPB) by TTL cleared with the TTL prior to its implementation. (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will be need for prequalification in the procurement arrangements under this Regional Project *These thresholds are for the purposes of the initial procurement plan for the PPA and for first 18 months. The thresholds will be revised periodically based on re- assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The LISGIS Project Management Team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Works There are no works under the Project Preparation Advance Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procurement Prequ Nation Revie Expecte Expecte Comment No. (Description) Cost Method alifica al w d bid d s US$ tion Prefer by opening Contrac (yes/n ence Bank date t o) (yes/n (Prior Signatu o) / Post) re Date 1 Procurement of 4 12,100 laptops, 3 No. all- in-1 printers, Limited, RFQ No No Post 28 Feb 4 Mar office desks, a 20 20 projector, metal filing cabinet, and stationery and supplies for project management Consultancy Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimate Selection Review Expecte Expected Expected Comments No. Assignment d Method/ by Bank d date Contract Completi Cost in Arrangem (Prior / of Signatur on US$ ent Post) proposal e Date submissi Date on 1. Recruitment of a Consultant to draft and validate 10,000 INDV Post 16 Mar 10 Apr 23 Apr ToR to be curricula of the 20 20 20 submitted to IDA Statistics degree & for Review and No CEST Program at Objection. the UL 2. Recruitment of a ToR, performance Financial evaluation, draft Management contract and Officer for Project DS Prior 10 Feb 21 Feb 31 Aug minutes of Management 20 20 20 contract negotiation to be submitted to IDA for Review and No 15,600 Objection. 3. ToR, performance evaluation, draft Recruitment of a contract and Procurement DS Prior 10 Feb 21 Feb 31 Aug minutes of Specialist for 20 20 20 contract Project 18,000 negotiation to be Management submitted to IDA for Review and No Objection. Training and Workshop (Training & Workshop activities are subject to TTL clearance). Estimat Estimated Expected Ref. Training, workshop and ed Cost Duration Training/workshop No. study tours in (Days) Date (US$) Conduct of validation 54,000 workshop and TOT for the GP Feb. 20 to March 1. on the design of 13 2020 questionnaires and enumeration training manual Workshop for cartographic 150,000 Feb. 24 to March 2. field staff training 16 2020 Workshop for enumeration 113,900 3. mapping training April 15, 2020 Study Tours to regional 32,000 countries for first-hand experience on regional March to April 4. harmonization of data 2020 collection, management and communication Workshops on current 50,000 administrative data across 5. April to July 2020 MACs and LISGIS regional offices Workshop to strengthen and 35,000 6. develop institutional capacity April to July 2020 of NSO Workshops for steering 40,000 7. committee on Administrative April to July 2020 Data Workshop for Project 10,000 Steering/Technical 8. Committees for annual work February 2020 plan preparation, review and validation GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) communication technology (including, without limitation, internet and telephone; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance; (iv) maintenance of equipment; (v) photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Western Africa : Harmonizing and Improving Statistics in West Africa PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2020-03-30 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169265 GPN Date: 2021-05-19 Project Name: Harmonizing and Improving Statistics in West Africa Loan / Credit No: IDA / 65730, IDA / D5840 M Executing Agency(ies): inistry of Finance and Economic Development WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-163632-CW-RFB Country-Specific Component: / Rehabilitation of Statistics Improving and modernizing Single Stage - One 2021-01- IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2020-03-26 2020-03-31 2020-05-12 2020-06-11 2020-07-16 Sierra Leone Physical physical and statistical Envelope 12 Infrastructure infrastructure GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: Harmonization, Data SL-MOFED-168263-GO-RFQ Collection, Quality Request for / Procurement of station IDA / D5840 Post 0.00 Canceled 2020-04-27 2020-04-27 2020-04-27 Improvement, Dissemination Quotations wagon and Use of Core Social and Economic Statistics Regional component: SL-MOFED-168262-GO-RFQ Harmonization, Data / Procurement of ICT Pending Collection, Quality Request for Single Stage - One equipment including IDA / D5840 Post Limited 0.00 Implementati 2020-04-29 2020-06-24 2020-12-21 Improvement, Dissemination Quotations Envelope laptops,photocopier and on and Use of Core Social and external drives Economic Statistics SL-MOFED-205719-GO-RFQ Pending Project Management and Request for Single Stage - One / Procurement of one vehicle IDA / D5840 Post Open - National 0.00 Implementati 2020-11-28 2021-01-23 2021-07-22 Monitoring and Evaluation Quotations Envelope for Project Coordination on SL-MOFED-205750-GO-RFB / procurement of servers Under Hardware (High Availability) Project Management and Single Stage - One IDA / D5840 Post Request for Bids Open - National 0.00 Implementati 2020-12-16 2020-12-17 2020-12-21 2021-02-01 2021-03-03 2021-04-07 2021-10-04 Windows Servers OS Monitoring and Evaluation Envelope on Microsoft, Client Antivirus and Software SL-MOFED-205730-GO-RFB / Procurement of laptop Country-Specific Component: Under computers for census Improving and modernizing Single Stage - One IDA / D5840 Post Request for Bids Open - International 0.00 Implementati 2020-11-30 2020-12-10 2020-12-05 2021-01-16 2021-02-15 2021-03-22 2021-09-18 including printers with physical and statistical Envelope on scanners for PCU Data infrastructure Science Team SL-MOFED-205734-GO-RFQ / Procurement of plotters, printers, machine for printing Country-Specific Component: of IEC materials, book binder& Under Improving and modernizing Request for Single Stage - One embroidery machines with IDA / D5840 Post Open - National 0.00 Implementati 2020-12-20 2021-02-14 2021-08-13 physical and statistical Quotations Envelope different sizes of flex on infrastructure banners& specific details to be provided before the procurement SL-MOFED-205740-GO-RFB / Procurement of Network Country-Specific Component: Under Infrastructural core Improving and modernizing Single Stage - One IDA / D5840 Post Request for Bids Open - National 0.00 Implementati 2020-11-25 2021-01-12 2020-11-30 2021-01-11 2021-02-10 2021-03-17 2021-09-13 equipment(Network hierarchy physical and statistical Envelope on design and HQ Structure infrastructure Cabling Country-Specific Component: SL-MOFED-205747-GO-RFB Pending Improving and modernizing / Procurement of cartographic IDA / D5840 Post Request for Bids 0.00 Implementati 2020-12-08 2020-12-13 2021-01-24 2021-02-23 2021-03-30 2021-09-26 physical and statistical imagery nation wide on infrastructure SL-MOFED-205736-GO-RFQ Country-Specific Component: / Procurement of Data Pending Improving and modernizing Request for Single Stage - One Collection Application IDA / D5840 Post Open - National 0.00 Implementati 2020-12-23 2021-02-17 2021-08-16 physical and statistical Quotations Envelope (Enumeration pad) with on infrastructure wireless network SL-MOFED-205748-GO-RFB Country-Specific Component: Under / Procurement of Android Improving and modernizing Single Stage - One IDA / D5840 Post Request for Bids Open - International 0.00 Implementati 2020-12-02 2020-12-10 2020-12-07 2021-01-18 2021-02-17 2021-03-24 2021-09-20 Tablets for Cartographic physical and statistical Envelope on mapping for Census operation infrastructure SL-MOFED-235343-GO-RFB / Procurement of Laptop Regional component: Computers, Docking Harmonization, Data Computers, Printers, Copiers, Pending Collection, Quality Single Stage - One Projectors, Recorders, IDA / D5840 Post Request for Bids Open - National 0.00 Implementati 2021-05-24 2021-05-29 2021-07-10 2021-08-09 2021-09-13 2022-03-12 Improvement, Dissemination Envelope Cameras, Digital Radios Sets, on and Use of Core Social and Scanners, UPS, Memory Sticks, Economic Statistics External Drives for PCU and Economic Statistics Regional component: SL-MOFED-235347-GO-RFQ Harmonization, Data Pending / Procurement of Office Collection, Quality Request for Single Stage - One IDA / D5840 Post Open - National 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 Furniture for three (3) field Improvement, Dissemination Quotations Envelope on Offices and Use of Core Social and Economic Statistics Page 1 Regional component: Harmonization, Data SL-MOFED-235349-GO-RFQ Pending Collection, Quality Request for Single Stage - One / Procurement of 50 Salter IDA / D5840 Post Open - National 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 Improvement, Dissemination Quotations Envelope Digital Scales on and Use of Core Social and Economic Statistics Regional component: Harmonization, Data SL-MOFED-235351-GO-RFQ Pending Collection, Quality Request for Single Stage - One / Procurement of Mobile IDA / D5840 Post Open - National 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 Improvement, Dissemination Quotations Envelope Network Infrastructure on and Use of Core Social and Economic Statistics SL-MOFED-235357-GO-RFB Regional component: / Procurement of Seventeen Harmonization, Data (17) Station Wagons, three Pending Collection, Quality Single Stage - One Out board Engines and IDA / D5840 Post Request for Bids Open - National 0.00 Implementati 2021-05-25 2021-05-30 2021-07-11 2021-08-10 2021-09-14 2022-03-13 Improvement, Dissemination Envelope Eighteen (18) Motor Bikes, on and Use of Core Social and Automatic for Stats-Sl for Economic Statistics Census and other Operations NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-205746-NC-RFB / Procurement of mobile Country-Specific Component: network and Internet Services Pending Improving and modernizing Single Stage - One to support Mid-Term Census IDA / D5840 Post Request for Bids Open - National 0.00 Implementati 2020-12-07 2020-12-12 2021-01-23 2021-02-22 2021-03-29 2021-09-25 physical and statistical Envelope and Installation of high speed on infrastructure Internet Services for six months SL-MOFED-216498-NC-DIR Country-Specific Component: Under / Procurement of Satellite Improving and modernizing IDA / D5840 Post Direct Selection Direct 0.00 Implementati 2021-02-01 2021-02-04 2021-02-06 2021-03-13 2021-09-09 Imagery for Cartographic physical and statistical on Mappings Nation wide infrastructure CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-205744-CS-CQS Country-Specific Component: / Recruitment of a consultant Consultant Improving and modernizing Pending to support CAP1, Tablets, IDA / D5840 Post Qualification Open - National 0.00 2020-12-14 2021-01-04 2021-02-17 2021-03-19 2021-04-23 2021-10-20 physical and statistical Implementation Provisioning and Data Selection infrastructure Analysis SL-MOFED-226614-CS-LCS / Audit of Financial Statements Project Management and Least Cost Under IDA / D5840 Post Open - National 0.00 2021-03-26 2021-04-12 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-04-03 for HISWA- Project (November- Monitoring and Evaluation Selection Implementation 2020- December,2021) SL-MOFED-235355-CS-CQS Regional component: / Hire a firm to conduct Harmonization, Data Consultant preparatory works for Stats SL Collection, Quality Pending IDA / D5840 Post Qualification Open - National 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 HQ rehabilitation of physical Improvement, Dissemination Implementation Selection infrastructure (Pre- and Use of Core Social and Construction activities) Economic Statistics INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-167863-CS-INDV Individual / Hiring a consultant to Project Management and Under IDA / D5840 Post Consultant Limited 0.00 2020-04-09 2020-04-14 2020-04-14 2020-05-05 2020-06-09 2020-12-06 develop the Project Monitoring and Evaluation Implementation Selection Implementation Manual Regional component: SL-MOFED-235339-CS-INDV Harmonization, Data Individual / Recruitment of an Individual Collection, Quality Pending IDA / D5840 Post Consultant Open 0.00 2021-05-19 2021-07-07 2021-07-28 2021-09-01 2022-02-28 Consultant as CAPI Consultant Improvement, Dissemination Implementation Selection for tablet provisioning and Use of Core Social and Economic Statistics Regional component: SL-MOFED-235340-CS-INDV Harmonization, Data Individual / Recruitment of an Individual Collection, Quality Pending IDA / D5840 Post Consultant Open 0.00 2021-05-19 2021-07-07 2021-07-28 2021-09-01 2022-02-28 Consultant for processing of Improvement, Dissemination Implementation Selection Data Analysis and Use of Core Social and Economic Statistics Regional component: SL-MOFED-235082-CS-INDV Harmonization, Data / Recruitment of an Individual Individual Collection, Quality Consultant for CAPI IDA / D5840 Post Consultant Open 0.00 Canceled 2021-05-18 2021-07-06 2021-07-27 2021-08-31 2022-02-27 Improvement, Dissemination Development for Data Selection and Use of Core Social and Management Economic Statistics Regional component: SL-MOFED-235337-CS-CDS Harmonization, Data / Recruitment of CSPro Collection, Quality Under IDA / D5840 Post Direct Selection Direct 0.00 2021-05-19 2021-05-24 2021-05-29 2021-08-02 2022-01-29 Consultant for digitizing the Improvement, Dissemination Implementation mid Term Census and Use of Core Social and Economic Statistics Page 2 PROCUREMENT PLAN (Textual Part) Project information: [Mozambique] [Sustainable Rural Economy Program] [P-174002] Project Implementation agency: [Ministério da Agricultura e Desenvolvimento Rural] Date of the Procurement Plan: [2021, 01 April] Period covered by this Procurement Plan: [18 months] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in “Regulamento de Contratação de Empreitada de Obras Públicas, Fornecimento de Bens e Prestação de Serviços ao Estado” of the Republic of Mozambique of March 8, 2016 (“the Regulation”), as per Decree No. 5/2016, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). NA Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; To be identified Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]: To be identified Other Relevant Procurement Information. NA PROCUREMENT Mozambique : Sustainable Rural Economy Program PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2021-05-07 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174002 GPN Date: Project Name: Sustainable Rural Economy Program Loan / Credit No: / Foundation for the Conservation of Biodiversity Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 10/ANAC/SREP/G/21 / Under Enhancing natural resources Acquisition of 5 motorbike for / Post Direct Selection Direct 5,000.00 0.00 Implementati 2021-06-15 2021-06-03 2021-06-20 2021-07-25 2022-01-21 management Tchuma Tchato on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 08/ANAC/SREP/CQS/21 / Consultant Development of the Enhancing natural resources / Post Qualification Open - National 23,200.00 0.00 Under Review 2021-05-31 2021-06-03 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 Management Plan for the management Selection Mágoe National Park 09/ANAC/SREP/CQS/21 / Development of an Integrated Consultant Enhancing natural resources Development Plan for the / Post Qualification Open - National 80,000.00 0.00 Under Review 2021-05-31 2021-06-03 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 management Tchuma Tchato Community Selection Program INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01/BIOFUND/SREP/IC/21 / Individual Strengthening institutions Under Procurement Officer for / Prior Consultant Open 72,000.00 0.00 2021-05-31 2021-06-09 2021-07-19 2021-08-09 2021-09-13 2022-03-12 and policies Implementation BIOFUND Selection Individual 02/BIOFUND/SREP/IC/21 / Strengthening institutions Under / Post Consultant Open 60,000.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Accountant for BIOFUND and policies Implementation Selection 07/ANAC/SREP/IC/21 / Individual Finance and Human Resources Enhancing natural resources Under / Post Consultant Open 60,000.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Officer for Mágoe National management Implementation Selection Park 06/ANAC/SREP/IC/21 / Community Development and Individual Enhancing natural resources Under Environmental Education / Post Consultant Open 60,000.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 management Implementation Officer for the Mágoe National Selection Park 04/ANAC/SREP/IC/21 / Individual Enhancing natural resources Under Operations Manager for / Post Consultant Open 103,200.00 0.00 2021-05-31 2021-06-10 2021-07-19 2021-08-09 2021-09-13 2022-03-12 management Implementation Tchuma Tchato Selection 05/ANAC/SREP/IC/21 / Community Development and Individual Enhancing natural resources Under Environmental Education / Post Consultant Open 60,000.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 management Implementation Officer for the Tchuma Tchato Selection Community Program 03/ANAC/SREP/IC/21 / Individual Enhancing natural resources Under Operations Manager for / Post Consultant Open 103,200.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 management Implementation Mágoe National Park Selection Page 1 PROCUREMENT PLAN Project information: COVID-19 EMERGENCY Response and Health Systems Preparedness Project Project Implementation agency: Ministry Of Health, Nutrition and Indigenous Medicine, Sri Lanka Date of the Procurement Plan: 24 MARCH 2020 Period covered by this Procurement Plan: 01 April 2020 to 30 June 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Procedures In accordance with the Procurement Regulations for IPF Borrowers (July 2016, revised November 2017) (“Procurement Regulations”), when approaching the national market, as agreed in the Procurement Plan tables in STEP, the country’s own procurement procedures may be used. When the Borrower, for the procurement of goods, works and non-consulting services, uses its own national open competitive procurement arrangements as set forth in Sri Lanka’s Procurement Guidelines 2006, such arrangements shall be subject to paragraph 5.4 of the Bank’s Procurement Regulations and the following conditions: 1. Only bidding documents acceptable to the Bank shall be used for all national open competitive procurement. 2. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 3. The eligibility of bidders shall be as defined under Section III of the World Bank Procurement Regulations for IPF Borrowers (Procurement Regulations): accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 4. In case of Open Tendering, the receipt of less than three bids shall not be considered grounds for cancellation and re-invitation of bids 5. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. HEIS is recommended for this project. Other Relevant Procurement Information. Since this is an emergency response project there will be no prior review for all procurement during the relief phase. Procurement of items for emergency requirements will follow methods of Direct Contracting, Procurement from UN Agencies, Limited bidding, etc. This project will also have higher value threshold for shopping and National procurement, as applicable in emergency projects. PROCUREMENT Sri Lanka : Sri Lanka COVID-19 Emergency Response and Health Systems Preparedness Project PLAN General Information Country: Sri Lanka Bank’s Approval Date of the Original Procurement Plan: 2020-05- 07 2021-05- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173867 GPN Date: 24 2020-04- Project Name: Sri Lanka COVID-19 Emergency Response and Health Systems Preparedness Project 30 Loan / Credit No: IBRD / 90850, IDA / 65950, TF / B3017 Ministry of Health Services and Indigenous Medicine Executing Agency(ies): WORKS Activity Reference No. Procurement Estimate Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati High SEA/SH Process Prequalification Bidding Documents Contract / Description Component Review Type Method Document d Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Risk Status Evaluation Report as Issued Completion Type Amount (US$) Documents Justification / Invitation Opening / Minutes Recommendation (US$) Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planne d LK-MOH-171565-CW-RFQ / Modifications and Pending refurbishment to provide Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2021- IBRD / 90850 Post Limited 60,000.00 0.00 Implemen isolation facilities for Covid COVID-19 Response Quotations Envelope 25 20 01-16 tation 19 patients with ICUs in National Hospital Kandy LK-MOH-173948-CW-RFQ / Partitioning Eighth Floor Pending for Isolating Rooms at Eight Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020- IDA / 65950 Post Limited 17,300.00 0.00 Implemen Storied Building – COVID-19 Response Quotations Envelope 08 27 08-26 tation District General Hospital Negombo LK-MOH-173947-CW-RFQ / Water Proofing work at Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020- IDA / 65950 Post Limited 12,420.00 0.00 Canceled Gampaha District General COVID-19 Response Quotations Envelope 05 24 08-23 Hospital new ICU unit LK-MOH-181751-CW-RFQ Pending / Conversion the WD 24 as Component 1: Emergency Request for Single Stage - One 2020-06- 2020-08- 2020- IDA / 65950 Post Limited 32,343.00 0.00 Implemen Covid 19 Ward at Badulla COVID-19 Response Quotations Envelope 30 11 09-01 tation Provincial General Hospital LK-MOH-181753-CW-RFQ / Convert Existing OPD C Pending Component 1: Emergency Request for Single Stage - One 2020-06- 2020-08- 2020- room for checking Corona IDA / 65950 Post Limited 6,694.00 0.00 Implemen COVID-19 Response Quotations Envelope 30 18 09-08 Patients at Gampaha tation Provincial General Hospital LK-MOH-189400-CW-RFQ / Extension of Piped Medical Pending gas System for ward No.22 Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020- IDA / 65950 Post Limited 3,980.00 0.00 Implemen and ward No. 03 obtained COVID-19 Response Quotations Envelope 24 19 11-09 tation by Badulla General Hospital during Covid period. LK-MOH-189741-CW-RFQ / Supplying and fixing Recast Concrete Soak-age Pending pit for mortuary Area and Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020- IDA / 65950 Post Limited 2,363.00 0.00 Implemen Fixing of Door for A & e COVID-19 Response Quotations Envelope 26 21 11-11 tation Theater area and orthopedic Clinic area at Baticalo General Hospital during Covid Period. LK-MOH-189742-CW-RFQ Pending / Improvement of covid 19 Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020- IDA / 65950 Post Limited 1,916.00 0.00 Implemen unit with aluminium COVID-19 Response Quotations Envelope 26 21 11-11 tation partition at Baticalo General Hospital LK-MOH-189743-CW-RFQ / Supply and fixing of Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020- patient waiting shed at IDA / 65950 Post Limited 6,484.00 0.00 Implemen COVID-19 Response Quotations Envelope 26 21 11-11 Baticalo General Hospital tation during Covid period. LK-MOH-189747-CW-RFB Pending / Renovation Of Ward 36 at Component 1: Emergency Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2020- IDA / 65950 Post Request for Bids Limited 18,336.00 0.00 Implemen Kandy General Hospital COVID-19 Response Envelope 21 26 09 23 21 11-11 tation during Covid period LK-MOH-189749-CW-RFB / Construction Of New Component 1: Emergency Single Stage - One 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020- Nurses Room At Ward No:10 IDA / 65950 Post Request for Bids Limited 4,969.00 6,405.41 Signed COVID-19 Response Envelope 21 01 26 01 09 10 23 11 21 11 11-11 at Kandy General Hospital during Covid period LK-MOH-189750-CW-RFB / Renovation of SBU For Component 1: Emergency Single Stage - One 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020- IDA / 65950 Post Request for Bids Limited 5,411.00 8,195.12 Signed Covid-19 Epidemic at Kandy COVID-19 Response Envelope 21 01 26 01 09 06 23 09 21 11 11-11 General Hospital during Covid period LK-MOH-189751-CW-RFB / Renovation of ETU, MICU, CT Scan Room, Bleeding Component 1: Emergency Single Stage - One 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020- Room and OPD Entrance IDA / 65950 Post Request for Bids Limited 6,682.00 7,844.49 Signed COVID-19 Response Envelope 21 01 26 01 09 10 23 11 21 14 11-11 Area For Covid -19 Epidemic at Kandy General Hospital during Covid period. LK-MOH-189752-CW-RFB / Construction of New Admission Rooms And Component 1: Emergency Single Stage - One 15,772.9 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020- Renovation of Wards For IDA / 65950 Post Request for Bids Limited 15,600.00 Signed COVID-19 Response Envelope 9 21 01 26 01 09 10 23 11 21 11 11-11 Corona Epidemic at Kandy General Hospital during Covid period. LK-MOH-189754-CW-RFB / Construction of New Admission Rooms And Pending Component 1: Emergency Single Stage - One 132,914.0 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2020- Renovation of Wards For IDA / 65950 Post Request for Bids Limited 0.00 Implemen COVID-19 Response Envelope 0 21 26 09 23 21 11-11 Corona Epidemic at Kandy tation General Hospital during Covid period LK-MOH-189755-CW-RFB / Installation of Utility Pending Component 1: Emergency Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2020- Supply For New Fourth Cath IDA / 65950 Post Request for Bids Limited 4,032.00 0.00 Implemen COVID-19 Response Envelope 21 26 09 23 21 11-11 Lab at Kandy General tation Hospital during Covid period. LK-MOH-189756-CW-RFB / Renovation of Cath Lab at Component 1: Emergency Single Stage - One 11,005.4 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020- IDA / 65950 Post Request for Bids Limited 7,801.00 Signed Kandy General Hospital COVID-19 Response Envelope 1 21 01 26 01 09 10 23 11 21 11 11-11 during Covid period. LK-MOH-189757-CW-RFB / Rearrangement Component 1: Emergency Single Stage - One 18,860.9 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020- Intermediate ICU For Covid IDA / 65950 Post Request for Bids Limited 15,963.00 Signed COVID-19 Response Envelope 3 21 01 26 01 09 10 23 13 21 14 11-11 -19 Epidemic at Kandy General Hospital during Covid period. LK-MOH-189758-CW-RFB / Demolishing of Old Director Quarters,Toilet Pending Component 1: Emergency Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2020- block and Temporary IDA / 65950 Post Request for Bids Limited 4,136.00 0.00 Implemen COVID-19 Response Envelope 21 26 09 23 21 11-11 Waiting Wall for Proposed tation Isolation Ward Complex at Kandy General Hospital during Covid period. LK-MOH-189759-CW-RFB / Renovation of Ward -5 and 6 For Covid -19 Component 1: Emergency Single Stage - One 11,772.9 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020- IDA / 65950 Post Request for Bids Limited 10,283.00 Signed Epidemic at Base Hospital- COVID-19 Response Envelope 8 21 01 26 01 09 10 23 11 21 11 11-11 Theldeniya at andy General Hospital during Covid period. LK-MOH-190363-CW-RFQ / Supply of necessary electrical supplies for air Pending conditioners in the section Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020- IDA / 65950 Post Limited 263.00 0.00 Implemen dedicated to Covid-19 COVID-19 Response Quotations Envelope 31 12 11-02 tation suspected patients in old medical intensive care unit at Ragama Teaching Hospital during Covid period. LK-MOH-190404-CW-RFQ / Partition work for Isolation Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020- Room, Supply & fixing of IDA / 65950 Post Limited 809.00 0.00 Implemen COVID-19 Response Quotations Envelope 31 12 11-02 sink and Electrical work in tation ward No.18 at NCTH Ragama. LK-MOH-190405-CW-RFQ Pending / Construction of Fence or Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020- IDA / 65950 Post Limited 1,502.00 0.00 Implemen wall between OPD Building COVID-19 Response Quotations Envelope 31 12 11-02 tation & Clinic Building at NCTH Ragama LK-MOH-190447-CW-DIR / Construction of Bathroom Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020- for Isolation room at IDA / 65950 Post Direct Selection Direct 1,497.00 0.00 Implemen COVID-19 Response 26 31 14 09-28 Rathnapura General Hospital tation during Covid period LK-MOH-190449-CW-DIR / Construction of Exhaust Pending line with HEPA Filters for Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020- IDA / 65950 Post Direct Selection Direct 2,033.00 0.00 Implemen Ward No.28 &Isolation room COVID-19 Response 26 31 14 09-28 tation at Rathnapura General Hospital during Covid period . LK-MOH-190450-CW-DIR / Construction of Exhaust Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020- line with HEPA Filters for A IDA / 65950 Post Direct Selection Direct 2,033.00 0.00 Implemen COVID-19 Response 26 31 14 09-28 & E ICU at Rathnapura tation General Hospital during Covid period . LK-MOH-190925-CW-RFQ / Renovation of emergency Treatment unit, Ward 02 and Intensive care unit of Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020- Base Hospital (Teaching) IDA / 65950 Post Limited 13,973.00 0.00 Implemen COVID-19 Response Quotations Envelope 02 28 11-27 Gampola to treat patients tation suspected of having COVID 19 at Gampola Base Hospital during Covid period LK-MOH-190926-CW-RFQ / Development of triage Pending area and patient Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020- IDA / 65950 Post Limited 16,175.00 0.00 Implemen examination room for COVID-19 Response Quotations Envelope 02 28 11-27 tation patients suspected of having COVID 19 at Base Hospital (Teaching) Gampola LK-MOH-190927-CW-RFQ / Development of triage area at Medical Clinic, Pediatrics clinic, Obstetrics Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020- clinic and Gynecological IDA / 65950 Post Limited 12,671.00 0.00 Implemen COVID-19 Response Quotations Envelope 02 28 11-27 clinic of Base Hospital tation (Teaching) Gampola and construction of patient waiting area at clinic to ensure physical LK-MOH-191041-CW-DIR Pending / Aluminium Works at Component 1: Emergency 2020-08- 2020-09- 2020-10- 2021- IDA / 65950 Post Direct Selection Direct 211.00 0.00 Implemen Ragama Teaching Hospital COVID-19 Response 28 02 07 04-05 tation during Covid period LK-MOH-192338-CW-RFQ Pending / Refurbishment of technical Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- TF / B3017 Post Limited 31,579.00 0.00 Implemen units of Health Promotion COVID-19 Response Quotations Envelope 28 09 12-09 tation Bureau under Covid Grant LK-MOH-192339-CW-RFQ / Renovation of Dining Room , Partitioning of Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020- Planning unit ,Renovation of TF / B3017 Post Limited 14,022.00 0.00 Implemen COVID-19 Response Quotations Envelope 11 22 12-22 Mithuru Piyasa & Women tation Health Unit at Family Health Bureau under Covid Grant LK-MOH-192353-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- refurbishment of psychiatry TF / B3017 Post Limited 26,316.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 unit at NHSL: Ward 59 under tation Covid Grant by College of psychiatry. LK-MOH-192360-CW-RFQ / Renovation of psychiatry Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- clinic at Base Hospital TF / B3017 Post Limited 526.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 Horana under Covid Grant tation by College of psychiatry. LK-MOH-192365-CW-RFQ / Renovation of seclusion room at District General Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- Hospital Vavunia to be used TF / B3017 Post Limited 1,842.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 as an isolation room or a tation seclusion room under Covid Grant by College of Psychiatry. LK-MOH-192367-CW-RFQ / Renovating psychiatry Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- clinic at Base Hospital TF / B3017 Post Limited 10,209.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 Nikaweratiya under Covid tation Grant by College of psychiatry. LK-MOH-192369-CW-RFQ / Renovating and Pending refurbishing psychiatry Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- TF / B3017 Post Limited 526.00 0.00 Implemen clinic at Base Hospital COVID-19 Response Quotations Envelope 28 09 12-09 tation Panadura under Covid Grant by College of psychiatry LK-MOH-192376-CW-RFQ Pending / Renovating mother baby Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- TF / B3017 Post Limited 1,316.00 0.00 Implemen unit at Base Hospital COVID-19 Response Quotations Envelope 28 09 12-09 tation Trincomalee by College of Psychiatry LK-MOH-192378-CW-RFQ Pending / Renovating and Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- TF / B3017 Post Limited 8,342.00 0.00 Implemen refurbishment of psychiatry COVID-19 Response Quotations Envelope 28 09 12-09 tation unit at Teaching Hospital Batticoloa LK-MOH-192382-CW-RFQ / Renovating psychiatry Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- ward and clinic at General TF / B3017 Post Limited 5,794.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 Hospital Rathnapura under tation Covid Grant by College of Psychiatry. LK-MOH-192383-CW-RFQ Pending / Renovating Psychiatry Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- TF / B3017 Post Limited 4,845.00 0.00 Implemen ward Nuwaraeliya to include COVID-19 Response Quotations Envelope 28 09 12-09 tation mother baby unit LK-MOH-192387-CW-RFQ / Renovating and Pending refurbishing child and Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- TF / B3017 Post Limited 21,053.00 0.00 Implemen adolescent psychiatry unit COVID-19 Response Quotations Envelope 28 09 12-09 tation Teaching Hospital Jaffna under Covid Grant by College of Psychiatry LK-MOH-192388-CW-RFQ / Renovating and Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- refurbishing psychiatry TF / B3017 Post Limited 15,790.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 clinic Base Hospital tation Telippalai under Covid Grant by College of Psychiatry. LK-MOH-192389-CW-RFQ / Renovating the Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- occupational therapy unit TF / B3017 Post Limited 23,684.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 Base Hospital Tellippalai tation under Covid Grant by College of Psychiatry LK-MOH-192391-CW-RFQ / Renovation of psychiatry Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- clinic Teaching Hospital TF / B3017 Post Limited 2,632.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 Kuliyapitiya under Covid tation Grant by College of Psychistry LK-MOH-192392-CW-RFQ / Development of Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- occupational therapy unit at TF / B3017 Post Limited 526.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 Base Hospital Mannar under tation Covid Grant by College of Psychiatry LK-MOH-192393-CW-RFQ / Renovating occupational therapy area and fencing Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- the horticulture area at TF / B3017 Post Limited 677.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 District General Hospital tation Kaluthara under Covid Grant by College of Psychiatry LK-MOH-192400-CW-RFQ / Renovating and Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- refurbishing rehabilitation TF / B3017 Post Limited 6,316.00 0.00 Implemen COVID-19 Response Quotations Envelope 28 09 12-09 unit at General Hospital tation Delthota under Covid Grant by College og Psychiatry LK-MOH-192401-CW-RFQ Pending / Renovate existing ward as Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020- TF / B3017 Post Limited 26,316.00 0.00 Implemen alcohol rehabilitation unit at COVID-19 Response Quotations Envelope 28 09 12-09 tation District Hospital Hikkaduwa LK-MOH-192666-CW-RFQ Pending / Renovation and Component 1: Emergency Request for Single Stage - One 135,962.0 2020-10- 2020-11- 2020- TF / B3017 Post Limited 0.00 Implemen refurbishment of COVID-19 Response Quotations Envelope 0 12 23 12-23 tation Epidemiology Unit under Covid Grant LK-MOH-193045-CW-RFQ / Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020- Construction/Refurbishment TF / B3017 Post Limited 632.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 16 12-16 of child mental health unit tation at DH Thalangama under Covid Grant Page 1 LK-MOH-193046-CW-RFQ / Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020- Construction/Refurbishment TF / B3017 Post Limited 1,782.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 16 12-16 of child mental health unit tation in General Hospital Katugasthota under Covid Grant LK-MOH-193047-CW-RFQ / Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020- Construction/Refurbishment TF / B3017 Post Limited 20,563.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 16 12-16 of child mental health unit tation in District Hospital Monaragala under Covid Grant LK-MOH-193472-CW-RFB / Renovation of Ward 34 For Pending Component 1: Emergency Single Stage - One 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- 2020- Covid -19 Epidemic at IDA / 65950 Post Request for Bids Limited 13,214.00 0.00 Implemen COVID-19 Response Envelope 11 16 07 21 11 12-11 Kandy Teaching Hospital tation during Covid period (Advance) LK-MOH-193592-CW-RFQ / Relocation, Modification & Pending Expansion of National Component 1: Emergency Request for Single Stage - One 107,605.0 2020-10- 2020-12- 2021- TF / B3017 Post Limited 0.00 Implemen Institute of Mental Health COVID-19 Response Quotations Envelope 0 23 04 01-03 tation rehabilitation centers under Covid Grant LK-MOH-198635-CW-RFQ / Renovating and Pending Conversion of existing ward Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021- TF / B3017 Post Limited 82,489.00 0.00 Implemen building Floor to Covid 19 COVID-19 Response Quotations Envelope 02 14 01-13 tation treatment ward at Warakapola hospital, Kagalla District. LK-MOH-201654-CW-RFQ / Renovation of Male Ward (4) ,Male Ward (5) ,Female Ward (1) ,Female Ward (2), Pending Component 1: Emergency Request for Single Stage - One 188,440.0 2020-11- 2020-12- 2021- Female Ward (3), Female IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 10 15 01-14 Ward (5), Admin Block (1), tation Admin Block (2) and ETU (1) of infectious Disease Hospital at Kilinochchi, Northern Province LK-MOH-201656-CW-RFQ / Renovation of ETU (2) ,Patient Dinning area ,PCR collecting points, Driver quarters, Nurses quarters, Pending Component 1: Emergency Request for Single Stage - One 121,886.0 2020-11- 2020-12- 2021- Doctor quarters, security IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 04 09 01-08 quarters, MOIC quarters, tation Consultant quarters, staff dining area, Security hut (Nos-4), Ambulance park and Water Supply System LK-MOH-201657-CW-RFQ / External electricity arrangement ,Construction of waste water collection pit to ward Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021- no.01,02,03,04,05,06,07 IDA / 65950 Post Limited 90,259.00 0.00 Implemen COVID-19 Response Quotations Envelope 04 09 01-08 and 08, Renovation of tation Directors office, Material Supply Cost - Fencing work and Improvement of IDH internal Road at kirushnapuram (880m) LK-MOH-203649-CW-RFQ / Construction of Steel Roof Pending Cover for Container for Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 65950 Post Limited 14,258.00 0.00 Implemen Covid Lab required by COVID-19 Response Quotations Envelope 13 08 07-07 tation General Hospital, Badulla during Covid period wave 1.(Advance) LK-MOH-203650-CW-RFQ / Improvement to Part of Pending the Ward no.03 for Covid Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 65950 Post Limited 18,093.00 0.00 Implemen Patients required by General COVID-19 Response Quotations Envelope 13 08 07-07 tation Hospital, Badulla during Covid period wave 1.(Advance) LK-MOH-203651-CW-RFQ / Improvement of Ward Pending No.22 & 23 for covid Patient Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 65950 Post Limited 11,073.00 0.00 Implemen treatment required by COVID-19 Response Quotations Envelope 13 08 07-07 tation General Hospital, Badulla during Covid period wave 1.(Advance) LK-MOH-203652-CW-RFQ / Extension of Piped Medical Pending gas System for ward No.22 Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 65950 Post Limited 1,937.00 0.00 Implemen required by General COVID-19 Response Quotations Envelope 13 08 07-07 tation Hospital, Badulla during Covid period wave 1.(Advance) LK-MOH-203653-CW-RFQ / Extension of Piped Medical Pending gas System for ward No.03 Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 65950 Post Limited 2,150.00 0.00 Implemen required by General COVID-19 Response Quotations Envelope 13 08 07-07 tation Hospital, Badulla during Covid period wave 1.(Advance) LK-MOH-203789-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 31,351.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Badulla DH- Bogahakumbura LK-MOH-203793-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 31,351.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Badulla DH- Bandarawela LK-MOH-203798-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 31,351.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Badulla DH- Uraniya LK-MOH-203806-CW-RFQ Pending / Essential modification to Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 32,432.00 0.00 Implemen the hospital building at COVID-19 Response Quotations Envelope 05 30 07-29 tation Galle DH- Arachchikanda LK-MOH-203829-CW-RFQ / Completion of the civil Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- works to the partially build IDA / 65950 Post Limited 15,135.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 hospital building at tation Hikkaduwa Galle-DH LK-MOH-203832-CW-RFQ Pending / Civil work for modification Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 63,514.00 0.00 Implemen of Hospital Building at COVID-19 Response Quotations Envelope 05 30 07-29 tation Vidaththalthive Mannar DH LK-MOH-203841-CW-RFQ / Renovation and modification to wards for Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- accommodating covid + IDA / 65950 Post Limited 21,082.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 patients and Modifications tation Required for Ambulance washing bay at Kandy DH Pussallawa LK-MOH-203933-CW-RFQ / Renovation and Pending modification to wards for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 61,081.00 0.00 Implemen accommodating covid + COVID-19 Response Quotations Envelope 05 30 07-29 tation patients at DH Padiyathalawa Ampara- _Eastern Province LK-MOH-203934-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 60,162.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at DH Kalmunai- _Eastern Province LK-MOH-203935-CW-RFQ / Renovation and Pending modification to wards for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 10,654.00 0.00 Implemen accommodating covid + COVID-19 Response Quotations Envelope 05 30 07-29 tation patients at DH Karadiyanaru, Batticolo- _Eastern Province LK-MOH-203936-CW-RFQ / Renovation and Pending modification to wards for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 72,270.00 0.00 Implemen accommodating covid + COVID-19 Response Quotations Envelope 05 30 07-29 tation patients at DH Echilammpaththu-Trinco- _Eastern Province LK-MOH-203945-CW-RFQ / Renovation and Pending modification to wards for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 27,027.00 0.00 Implemen accommodating covid + COVID-19 Response Quotations Envelope 05 30 07-29 tation patients at DH Ambanpola, North Western Province LK-MOH-203947-CW-RFQ / Renovation and Pending modification to wards for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 27,027.00 0.00 Implemen accommodating covid + COVID-19 Response Quotations Envelope 05 30 07-29 tation patients at DH Narammala, North Western Province LK-MOH-203948-CW-RFQ / Renovation and Pending modification to wards for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 45,946.00 0.00 Implemen accommodating covid + COVID-19 Response Quotations Envelope 05 30 07-29 tation patients at DH Dankotuwa, North Western Province LK-MOH-203951-CW-RFQ / Partitioning and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 16,216.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Udugoda- aluminum works LK-MOH-203953-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 32,432.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Rakwana DH LK-MOH-203954-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 4,865.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Laggala DH , Matale LK-MOH-203955-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 37,838.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Mankulam DH LK-MOH-203957-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 151,325.0 2020-12- 2021-01- 2021- modification to IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 05 30 07-29 Rehabilitation Center for tation covid + patients at Ampara DGH LK-MOH-203961-CW-RFQ Pending / Modification to ward Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 37,838.00 0.00 Implemen building to accommodate COVID-19 Response Quotations Envelope 05 30 07-29 tation for Covid patients of Walapane Hospital LK-MOH-203962-CW-RFQ Pending / Modification to ward Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 21,622.00 0.00 Implemen building to accommodate COVID-19 Response Quotations Envelope 05 30 07-29 tation Covid patients of Dikoya Hospital LK-MOH-203964-CW-RFQ / Constructions of Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- ambulance washing bay at IDA / 65950 Post Limited 5,405.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 Polonaruwa Pulathisipura tation National College of education LK-MOH-203965-CW-RFQ / Renovations and necessary Pending Component 1: Emergency Request for Single Stage - One 100,000.0 2020-12- 2021-01- 2021- improvements for covid 19 IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 05 30 07-29 suspected patients ward at tation DH Atabage LK-MOH-203966-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 91,892.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients-Kithulgala Hospital LK-MOH-203968-CW-RFQ Pending / Improvement of existing Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 37,838.00 0.00 Implemen building at DH C Beligala COVID-19 Response Quotations Envelope 05 30 07-29 tation for Covid patient treatment LK-MOH-203969-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 122,703.0 2020-12- 2021-01- 2021- modification to wards and IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 05 30 07-29 other construction works for tation covid + patients at Ampara DGH LK-MOH-203976-CW-RFQ / To initiate ICU and HDU facilities to facilitate the Pending Component 1: Emergency Request for Single Stage - One 116,216.0 2020-12- 2021-01- 2021- management of COVID 19 IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 05 30 07-29 patients at Physical and tation Mental Rehabilitation Centre at Ampara DGH LK-MOH-203985-CW-RFQ / Modifications required to convert ward 25 to accommodate covid positive Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- psychiatric male patients IDA / 65950 Post Limited 16,210.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 and rehabilitation unit to tation accommodate the psychiatric covid positive female patients at NIMH LK-MOH-205317-CW-RFQ Pending / Refurbishment of ward no Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 9,189.00 0.00 Implemen 07 as covid intermediate COVID-19 Response Quotations Envelope 05 30 07-29 tation ward at Mahamodara TH LK-MOH-205318-CW-RFQ / Refurbishment of health Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- education unit in to covid IDA / 65950 Post Limited 21,081.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 isolation ward at TH tation Mahamodara LK-MOH-205321-CW-RFQ Pending / Establishing medical Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 16,216.00 0.00 Implemen cubicles with Air conditions COVID-19 Response Quotations Envelope 05 30 07-29 tation and communication system LK-MOH-205323-CW-RFQ Pending / Modifications Required for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 5,405.00 0.00 Implemen Ambulance washing bay at COVID-19 Response Quotations Envelope 05 30 07-29 tation Akurana DH LK-MOH-205325-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification of wards for IDA / 65950 Post Limited 16,216.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid tation positive patients at Akurana DH LK-MOH-205326-CW-RFQ Pending / Telecommunication facility Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 7,868.00 0.00 Implemen and surveillance system for COVID-19 Response Quotations Envelope 05 30 07-29 tation Pussalawa and Akurana DH LK-MOH-205328-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification of wards for IDA / 65950 Post Limited 32,432.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid tation positive patients at DH, Buttala LK-MOH-205332-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 62,864.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Palamunai DH LK-MOH-205333-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 62,865.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Echchilampaththu DH LK-MOH-205336-CW-RFQ / Modification to ward 21 Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- converting to isolation ward IDA / 65950 Post Limited 11,351.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 at Apeksha Hospital tation Maharagama LK-MOH-205478-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification to wards for IDA / 65950 Post Limited 75,675.00 0.00 Implemen COVID-19 Response Quotations Envelope 05 30 07-29 accommodating covid + tation patients at Gampola Base Hospital LK-MOH-205479-CW-RFQ / Conversion of DH Pending Component 1: Emergency Request for Single Stage - One 102,703.0 2020-12- 2021-01- 2021- Unawatuna to quarantine IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 05 30 07-29 and management of covid tation 19 psychiatrics patients Page 2 LK-MOH-205632-CW-RFQ Pending Component 1: Emergency Request for Single Stage - One 194,594.0 2020-12- 2021-02- 2021- / Renovation and IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 12 06 08-05 modification to ICU in TH tation Anuradhapuara LK-MOH-192346-CW-RFQ / Renovation and Pending refurbishment of psychiatry Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- TF / B3017 Post Limited 94,366.00 0.00 Implemen unit at Teaching Hospital COVID-19 Response Quotations Envelope 05 16 02-15 tation Ragama under Covid Project by College of psychiatry. LK-MOH-207181-CW-RFQ / Renovation and Pending modification to ICU and Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 48,649.00 0.00 Implemen HDU facilities for COVID-19 Response Quotations Envelope 19 30 03-01 tation accommodating covid positive patients at Marawila BH-aluminum works LK-MOH-207186-CW-RFQ / Essential renovations to Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- provide staff quarantine and IDA / 65950 Post Limited 43,243.00 0.00 Implemen COVID-19 Response Quotations Envelope 19 30 03-01 accommodation facilities at tation COVID19 treatment center LK-MOH-207192-CW-RFQ / Establishment of 6 bedded Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- HDU facilities for IDA / 65950 Post Limited 16,216.00 0.00 Implemen COVID-19 Response Quotations Envelope 19 30 03-01 complicated COVID 19 tation patients for DH Pinbura LK-MOH-207200-CW-RFQ / Modifications required for Pending ward no.3, 10, 05, 01 and Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 16,216.00 0.00 Implemen psychiatric ward at BH COVID-19 Response Quotations Envelope 19 30 03-01 tation homagama to provide multi disciplinary care for Covid 19 LK-MOH-207201-CW-RFQ / Modifications required for Pending ward no.8 and 5 to Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 54,054.00 0.00 Implemen accommodate covid+ COVID-19 Response Quotations Envelope 19 30 03-01 tation maternal and child patients at Kandana BH LK-MOH-207205-CW-RFQ Pending / Renovations of wards 02 Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 21,622.00 0.00 Implemen and 03 as COVID Unit at COVID-19 Response Quotations Envelope 19 30 03-01 tation Maldeniya BH LK-MOH-207206-CW-RFQ / Extension of ward 17 to Pending accommodate ICU and HDU Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 43,243.00 0.00 Implemen facilities for Covid 19 COVID-19 Response Quotations Envelope 19 30 03-01 tation patients at Peradeniya Teaching Hospital in Kandy District LK-MOH-207207-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- modification of wards for IDA / 65950 Post Limited 16,216.00 0.00 Implemen COVID-19 Response Quotations Envelope 19 30 03-01 accommodating covid tation positive patients at DH Gangodagama LK-MOH-207208-CW-RFQ / Setting up a removable Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- safety fence at intermediate IDA / 65950 Post Limited 10,811.00 0.00 Implemen COVID-19 Response Quotations Envelope 19 30 03-01 COVID care center at Nilwala tation college of education LK-MOH-207428-CW-RFQ Pending / Modifications at DH Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021- IDA / 65950 Post Limited 10,811.00 0.00 Implemen Athurugiriya to provide COVID-19 Response Quotations Envelope 26 06 03-08 tation elderly patient care LK-MOH-207618-CW-RFQ Pending / Civil works for further Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 29,730.00 0.00 Implemen essential improvement at COVID-19 Response Quotations Envelope 27 31 03-02 tation IDH Kilinochchi LK-MOH-207633-CW-RFQ Pending / Improvement work to Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021- IDA / 65950 Post Limited 10,270.00 0.00 Implemen External Water Supply and COVID-19 Response Quotations Envelope 27 31 03-02 tation Director Office at IDH Kilinochchi LK-MOH-203960-CW-RFQ Pending / Modification to ward Component 1: Emergency Request for 189,189.0 2020-12- 2021-02- 2021- IDA / 65950 Post 0.00 Implemen building to accommodate COVID-19 Response Quotations 0 23 17 08-16 tation Covid patient of Maskeliya Hospital LK-MOH-210690-CW-RFB Pending Component 1: Emergency Single Stage - One 340,541.0 2021-01- 2021-01- 2021-03- 2021-04- 2021-05- 2021- / Construction of 8 bedded IDA / 65950 Post Request for Bids Open - National 0.00 Implemen COVID-19 Response Envelope 0 20 25 08 07 12 11-08 ICU unit at BH Balangoda tation LK-MOH-210698-CW-RFQ / Establishment of 4 bedded Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- HDU facilities for IDA / 65950 Post Limited 75,646.00 0.00 Implemen COVID-19 Response Quotations Envelope 04 01 08-28 complicated covid 19 tation patients treatment unit at BH Eheliyagoda LK-MOH-210704-CW-RFQ / Modifying a ward for quarantining in isolation of Pending disabled patients who are Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- IDA / 65950 Post Limited 27,027.00 0.00 Implemen arriving from abroad at COVID-19 Response Quotations Envelope 09 06 09-02 tation Rheumatology and Rehabilitation Hospital Ragama LK-MOH-210708-CW-RFQ / Converting ward 05 for covid + psychiatric patients Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- and Converting kitchen IDA / 65950 Post Limited 41,625.00 0.00 Implemen COVID-19 Response Quotations Envelope 09 06 09-02 building to nurse station & tation construction of 3 unit toilet bocks at BH Pimbura LK-MOH-210712-CW-RFQ Pending / Establishment COVID-19 Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- IDA / 65950 Post Limited 32,432.00 0.00 Implemen treatment center at DH COVID-19 Response Quotations Envelope 09 06 09-02 tation Damana LK-MOH-210715-CW-RFQ Pending / Establishing level 2 Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- IDA / 65950 Post Limited 97,297.00 0.00 Implemen COVID19 treatment center COVID-19 Response Quotations Envelope 11 08 09-04 tation at DH Kuchchaveli LK-MOH-210716-CW-RFQ / Renovation and Pending Component 1: Emergency Request for Single Stage - One 108,108.0 2021-01- 2021-03- 2021- modification of wards for IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 11 08 09-04 accommodating COVID-19 tation positive patients DK Kallar LK-MOH-210718-CW-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- / Construction of waiting IDA / 65950 Post Limited 2,703.00 0.00 Implemen COVID-19 Response Quotations Envelope 12 09 09-05 area DH Padiyathalawa tation LK-MOH-210719-CW-RFQ Pending / Establishing Covid-19 Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- IDA / 65950 Post Limited 59,459.00 0.00 Implemen treatment center at DH COVID-19 Response Quotations Envelope 11 08 09-04 tation Murathamunai LK-MOH-193602-CW-RFQ / Renovation and Re- Pending Component 1: Emergency Request for Single Stage - One 178,378.0 2020-10- 2020-11- 2020- furbishment of Nursing TF / B3017 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 13 24 12-24 Training School at tation Mulleriyawa under Covid Grant LK-MOH-212455-CW-RFQ / Renovation, modification and additions to existing Pending Mortuary to establish 15 Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- IDA / 65950 Post Limited 81,081.00 0.00 Implemen Unit Dialysis Center COVID-19 Response Quotations Envelope 25 22 09-18 tation including installation of RO plant and convertainer for storage purpose at DH Kandana. LK-MOH-212465-CW-DIR Pending / Increase the Height of the Component 1: Emergency 2021-01- 2021-01- 2021-03- 2021- IDA / 65950 Post Direct Selection Direct 10,811.00 0.00 Implemen incinerator Chimney at DGH COVID-19 Response 20 25 01 08-28 tation Negombo. LK-MOH-212471-CW-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- / Modification to Ward 4 to IDA / 65950 Post Limited 75,675.00 0.00 Implemen COVID-19 Response Quotations Envelope 24 21 09-17 establish a 4 bedded ICU tation LK-MOH-212617-CW-RFQ / Improvements on Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- Respiratory ward and other IDA / 65950 Post Limited 18,000.00 0.00 Implemen COVID-19 Response Quotations Envelope 25 22 09-18 additional units and Safety tation Improvement on Radiology Department LK-MOH-212618-CW-RFQ Pending / Improving the ventilation Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- IDA / 65950 Post Limited 7,417.00 0.00 Implemen facility in the PCU theater COVID-19 Response Quotations Envelope 25 22 09-18 tation and ICU ventilation system LK-MOH-212628-CW-RFQ / Supply, Intallation and Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021- Commissioning of Air IDA / 65950 Post Limited 27,027.00 0.00 Implemen COVID-19 Response Quotations Envelope 25 22 09-18 Conditioning System at Base tation Hospital Kamburugamuwa LK-MOH-215727-CW-RFB Pending / Improviement of exsisting Component 1: Emergency Single Stage - One 162,162.0 2021-01- 2021-02- 2021-03- 2021-04- 2021-05- 2021- IDA / 65950 Post Request for Bids Open - National 0.00 Implemen operation teater to covid COVID-19 Response Envelope 0 31 05 19 18 23 11-19 tation treatment Center LK-MOH-215748-CW-RFQ / Constuction of Water Pending Reservoir at the Natural Component 1: Emergency Request for Single Stage - One 2021-02- 2021-04- 2021- IDA / 65950 Post Limited 27,030.00 0.00 Implemen Water Source, laying pipes COVID-19 Response Quotations Envelope 05 02 09-29 tation and construction of Overhead tank at Endana Divisional hospital. LK-MOH-212445-CW-RFQ / Installation of Negative pressure system, Hepa Pending Filters and UV lights with Component 1: Emergency Request for Single Stage - One 135,135.0 2021-04- 2021-06- 2021- IDA / 65950 Post Limited 0.00 Implemen necessary improvements COVID-19 Response Quotations Envelope 0 10 05 12-02 tation and modifications to the infra structure to the existing Ward No 28 LK-MOH-224044-CW-RFB / Establishment of 10 Pending Component 1: Emergency Single Stage - One 237,000.0 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022- bedded ICU in COVID 19 IDA / 65950 Post Request for Bids Open - National 0.00 Implemen COVID-19 Response Envelope 0 20 25 06 06 10 02-06 level 2 treatment center at tation BH Warakapola LK-MOH-224240-CW-RFQ Pending / Urgent modifications Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021- IDA / 65950 Post Limited 5,300.00 0.00 Implemen required at medical ward to COVID-19 Response Quotations Envelope 13 08 12-05 tation accomodate 3 HDU beds LK-MOH-224243-CW-RFQ / Modification required for Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021- partitioning of ward 13& 15 IDA / 65950 Post Limited 26,400.00 0.00 Implemen COVID-19 Response Quotations Envelope 25 20 12-17 to accommodate psychiatry tation patients in siolation LK-MOH-224248-CW-RFQ Pending / conversion of general ICU Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021- IDA / 65950 Post Limited 26,400.00 0.00 Implemen in to a 8 bedded covid COVID-19 Response Quotations Envelope 26 21 12-18 tation treatment ICU LK-MOH-224660-CW-RFB / Renovation and modifications to the Pending Component 1: Emergency Single Stage - One 1,160,000. 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022- existing buildings of District IDA / 65950 Post Request for Bids Open - National 0.00 Implemen COVID-19 Response Envelope 00 15 20 01 01 05 02-01 General Hospital tation Hambanthota to convert into an infectious disease hospital including a laboratory. LK-MOH-224253-CW-RFQ / Essential modifications to Pending Component 1: Emergency Request for Single Stage - One 131,600.0 2021-05- 2021-06- 2021- convert exsisting motuary IDA / 65950 Post Limited 0.00 Implemen COVID-19 Response Quotations Envelope 0 02 27 12-24 into dialasys center for tation covid + patients LK-MOH-224239-CW-RFQ / Establishemnt of HDU for Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021- moderate sysptoms & ICU IDA / 65950 Post Limited 15,800.00 0.00 Canceled COVID-19 Response Quotations Envelope 13 08 12-05 step down patients - methsiri sewana Request for LK-MOH-231792-CW-RFQ Quotations - Pending / Renovation of Audeo Component 1: Emergency Request for Single Stage - One Small Works 2021-05- 2021-07- 2022- IDA / 65950 Post Limited 12,100.00 0.00 Implemen Visual Stoodeo and COVID-19 Response Quotations Envelope (Emergency) 25 20 01-16 tation Edidditing Room at Health SPD - Promotion Bureau Competitive LK-MOH-232321-CW-RFQ Request for / Construction of a patient Quotations - wash room to Ward No 21 Pending Component 1: Emergency Request for Single Stage - One Small Works 2021-05- 2021-07- 2022- of Apeksha Hospital IDA / 65950 Post Limited 9,000.00 0.00 Implemen COVID-19 Response Quotations Envelope (Emergency) 17 12 01-08 (Cancer) to manage Covid tation SPD - positive Cancer patients and Competitive Covid doubt full Cancer patients LK-MOH-212447-CW-RFB Request for Bids Pending / Extension to medical Ward Component 1: Emergency Single Stage - One - Small Works 1,270,000. 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2021- IDA / 65950 Post Request for Bids Open - National 0.00 Implemen for establishment of ten COVID-19 Response Envelope SPD (1 envelope 00 02 07 18 18 22 12-19 tation Bedded ICU at TH process) Rathnapura. Request for LK-MOH-236971-CW-RFQ Quotations - Pending Component 1: Emergency Request for Single Stage - One 2021-07- 2021-08- 2022- / Renovation of Office Room IDA / 65950 Post Limited Small Works 4,150.00 0.00 Implemen COVID-19 Response Quotations Envelope 03 28 02-24 and Toilet (Emergency) tation SPD - Competitive GOODS Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual LK-MOH-171730-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- / Supplying of Hardware IBRD / 90850 Post Limited 11,033.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Items ation LK-MOH-171737-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- / Supplying and Installation IBRD / 90850 Post Limited 11,579.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 11 of Air Conditioning ation Machines LK-MOH-171735-GO-DIR Pending / Supplying of Aluminum Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 65950 Post Limited 8,158.00 0.00 Implement Items for Refurbishment of COVID-19 Response Quotations Envelope 25 13 27 ation an ICU at Gampaha DGH LK-MOH-171734-GO-DIR / Supplying of Tiles and Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Sanitary Fittings or Required IDA / 65950 Post Limited 12,105.00 0.00 Implement COVID-19 Response Quotations Envelope 26 14 28 for Refurbishment of an ICU ation at Gampaha DGH LK-MOH-172529-GO-DIR / SUPPLY REAGENT FOR BS Pending Component 1: Emergency 2020-05- 2020-05- 2020-06- 2020-06- 800 BIOCHEMISTRY IDA / 65950 Post Direct Selection Direct 52,632.00 0.00 Implement COVID-19 Response 07 12 02 17 ANALYZER for Kandy ation Teaching Hospital during Covid 19 period LK-MOH-172535-GO-DIR Pending / SUPPLY of PCR KIT Component 1: Emergency 2020-05- 2020-05- 2020-06- 2020-06- IDA / 65950 Post Direct Selection Direct 52,632.00 0.00 Implement required for Kandy Teaching COVID-19 Response 07 12 02 17 ation Hospital during Covid 19 period LK-MOH-172539-GO-RFQ Pending / 6500 Nos Goggles Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 34,655.00 0.00 Implement procured by MSD during COVID-19 Response Quotations Envelope 12 30 14 ation Covid 19 period LK-MOH-172541-GO-RFQ Pending / 9975 Nos N95 mask Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 21,053.00 0.00 Implement procured by MSD during COVID-19 Response Quotations Envelope 12 30 14 ation Covid 19 period LK-MOH-172542-GO-RFQ Pending / 10275 Nos Coverall Kits Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 63,503.00 0.00 Implement procured by MSD during COVID-19 Response Quotations Envelope 12 30 14 ation Covid 19 period LK-MOH-172543-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- / 405 Nos Boots procured IDA / 65950 Post Limited 7,895.00 0.00 Implement COVID-19 Response Quotations Envelope 12 30 14 by MSD during Covid Period ation LK-MOH-172545-GO-DIR / 2500 Nos PERSONAL Pending Component 1: Emergency 2020-05- 2020-05- 2020-06- 2020-06- PROTECTIVE EQUIPMENT IDA / 65950 Post Direct Selection Direct 123,684.00 0.00 Implement COVID-19 Response 07 12 09 23 (PPE)SET procured by SPC ation during Covid 19 period LK-MOH-172546-GO-DIR / 5000 Nos PERSONAL Pending Component 1: Emergency 2020-05- 2020-05- 2020-06- 2020-06- PROTECTIVE EQUIPMENT IDA / 65950 Post Direct Selection Direct 244,737.00 0.00 Implement COVID-19 Response 07 12 09 23 (PPE)SET procured by SPC ation during Covid 19 period LK-MOH-172548-GO-DIR Pending Component 1: Emergency 2020-05- 2020-05- 2020-06- 2020-06- / 16 Nos. Diathermy IDA / 65950 Post Direct Selection Direct 100,979.00 0.00 Implement COVID-19 Response 07 12 02 17 procured by BME during ation Covid 19 period Page 3 LK-MOH-172549-GO-RFB Pending / 10 Nos. Multi Monitor Component 1: Emergency Single Stage - One 2020-05- 2020-05- 2020-05- 2020-05- 2020-06- 2020-07- IDA / 65950 Post Request for Bids Limited 8,000.00 0.00 Implement procured by BME during COVID-19 Response Envelope 07 12 14 28 25 09 ation Covid 19 period LK-MOH-172552-GO-RFB Pending / 50 Nos. Micro Component 1: Emergency Single Stage - One 2020-05- 2020-05- 2020-07- 2020-08- 2020-09- 2021-03- IDA / 65950 Post Request for Bids Open - National 20,941.00 0.00 Implement Microhaematocrit procured COVID-19 Response Envelope 26 31 12 11 15 14 ation by BME during Covid 19 period LK-MOH-172554-GO-RFQ / Mattress 50, Plastic Table 30, Plastic chair with arm Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- 60, Plastic chair with out IDA / 65950 Post Limited 2,632.00 0.00 Implement COVID-19 Response Quotations Envelope 12 30 14 arm -60 procured by MoH ation Procurement Department during Covid 19 period LK-MOH-172556-GO-RFQ Pending / Hospital Beds 50 procured Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 7,895.00 0.00 Implement by MoH Procurement COVID-19 Response Quotations Envelope 12 30 14 ation Department during Covid 19 period LK-MOH-172557-GO-RFQ Pending / Bed Side Lockers 140 Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 12,632.00 0.00 Implement procured by MoH Supplies COVID-19 Response Quotations Envelope 12 30 14 ation Division during Covid period LK-MOH-172560-GO-RFQ / Mattress 50, Plastic Table 45, Plastic chair with arm Pending 60, Plastic chair with out Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 6,316.00 0.00 Implement arm -110 Water Dispenser COVID-19 Response Quotations Envelope 12 30 14 ation 30 procured by MoH Procurement Department during Covid 19 period LK-MOH-172564-GO-RFQ Pending / Mattress 50 procured by Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 1,053.00 0.00 Implement MoH Procurement COVID-19 Response Quotations Envelope 12 30 14 ation Department during Covid 19 period LK-MOH-172565-GO-RFQ Pending / Hospital Beds 25 procured Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 3,947.00 0.00 Implement by MoH Procurement COVID-19 Response Quotations Envelope 12 30 14 ation Department during Covid 19 period LK-MOH-172566-GO-RFQ / Porcelain Plates Porcelain Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- Cup & Sauces procured by IDA / 65950 Post Limited 300.00 0.00 Implement COVID-19 Response Quotations Envelope 12 30 14 MoH Procurement ation Department during Covid 19 period LK-MOH-172680-GO-RFQ / Mosquito Nets 6' x Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- 4'(Round) procured by MoH IDA / 65950 Post Limited 138.00 0.00 Implement COVID-19 Response Quotations Envelope 12 30 14 Procurement Department ation during Covid 19 period LK-MOH-172681-GO-RFQ / Bed Sheets ,Pillows,Pillow Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- Cases procured by MoH IDA / 65950 Post Limited 1,022.00 0.00 Implement COVID-19 Response Quotations Envelope 12 30 14 Procurement Department ation during Covid 19 period LK-MOH-172682-GO-RFQ / Porcelain Plates Porcelain Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Cup & Sauces procured by IDA / 65950 Post Limited 480.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 MoH Procurement ation Department during Covid 19 period LK-MOH-172683-GO-RFQ / Mosquito Nets 6' x Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- 4'(Round) procured by MoH IDA / 65950 Post Limited 276.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Procurement Department ation during Covid 19 period LK-MOH-172684-GO-RFQ / Bed Sheets , Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Pillows,Pillows Cases IDA / 65950 Post Limited 1,566.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 procured by MoH ation Procurement Department during Covid 19 period LK-MOH-172686-GO-RFQ / Purchasing polythene for Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- the PPE kits procured by IDA / 65950 Post Limited 5,263.00 0.00 Implement COVID-19 Response Quotations Envelope 13 24 01 MoH Development unit ation during Covid 19 period LK-MOH-172688-GO-RFQ / Iron Bed – (Double bunker Bed) 10 Unit (Preparation of Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Doctors quarters to face IDA / 65950 Post Limited 574.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 COVID 19 Pandemic) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172689-GO-RFQ / Double Layer form mattress 20 unit Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- (Preparation of Doctors IDA / 65950 Post Limited 621.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 quarters to face COVID 19 ation Pandemic) procured by Kalubowila Hospital during Covid 19 period LK-MOH-172690-GO-RFQ / Double Layer form mattress 20 unit Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- (Preparation of Doctors IDA / 65950 Post Limited 621.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 quarters to face COVID 19 ation Pandemic) procured by Kalubowila Hospital during Covid 19 period LK-MOH-172691-GO-RFQ / Wooden Table 3’ x 2’ Teak 8 unit (Preparation of Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Doctors quarters to face IDA / 65950 Post Limited 905.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 COVID 19 Pandemic) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172692-GO-RFQ / MDF Wooden Table 4’ x 2’ Unit 2 (Preparation of Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Doctors quarters to face IDA / 65950 Post Limited 157.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 COVID 19 Pandemic) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172693-GO-RFQ / Computer Chairs with arm Unit 10 (Preparation of Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Doctors quarters to face IDA / 65950 Post Limited 458.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 COVID 19 Pandemic) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172694-GO-RFQ / Plastic Chairs (without arm) Unit 100 (Preparation Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- of Doctors quarters to face IDA / 65950 Post Limited 464.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 COVID 19 Pandemic) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172695-GO-RFQ / Plastic Paddle bin 18 L - Unit 10 (Preparation of Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Doctors quarters to face IDA / 65950 Post Limited 145.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 COVID 19 Pandemic) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172696-GO-RFQ / Plastic Paddle Bin with wheel – 70L -2 unit Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- (Preparation of Doctors IDA / 65950 Post Limited 73.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 quarters to face COVID 19 ation Pandemic) procured by Kalubowila Hospital during Covid 19 period LK-MOH-172697-GO-RFQ / Plastic Bucket – 45L - Unit 10 (Preparation of Doctors Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- quarters to face COVID 19 IDA / 65950 Post Limited 103.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Pandemic) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172699-GO-RFQ / Basin – (Plastic) – 25 L - unit 10 (Preparation of Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Doctors quarters to face IDA / 65950 Post Limited 23.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 COVID 19 Pandemic) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172700-GO-RFQ / Paddle bin – 40L - 3 Unit (Preparation of Doctors Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- quarters to face COVID 19 IDA / 65950 Post Limited 69.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Pandemic) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172701-GO-RFQ / Paddle bin – 10L 10 unit (Preparation of Doctors Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- quarters to face COVID 19 IDA / 65950 Post Limited 63.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Pandemic) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172702-GO-RFQ / Googles – Normal 300 Unit (Opening Up New Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Isolation Unit For COVID 19 IDA / 65950 Post Limited 624.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Suspected patients procured ation by Kalubowila Hospital during Covid 19 period LK-MOH-172703-GO-RFQ / Googles – No ; 01 100 Unit (Opening Up New Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Isolation Unit For COVID 19 IDA / 65950 Post Limited 471.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Suspected patients) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172705-GO-RFQ / Washing Machine – 100% Drier – 8Kg 01 Unit Pending (Opening Up New Isolation Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 65950 Post Limited 753.00 0.00 Implement Unit For COVID 19 COVID-19 Response Quotations Envelope 13 01 15 ation Suspected patients) procured by Kalubowila Hospital during Covid 19 period LK-MOH-172706-GO-RFQ / Wall Fan - 3 unit (Opening Up New Isolation Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Unit For COVID 19 IDA / 65950 Post Limited 261.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Suspected patients) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172707-GO-RFQ / Wall Fan 3 Unit (Opening Up New Isolation Unit For Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- COVID 19 Suspected IDA / 65950 Post Limited 221.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 patients) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172708-GO-RFQ / Ex house Fan (12x12) 1 unit (Opening Up New Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Isolation Unit For COVID 19 IDA / 65950 Post Limited 50.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Suspected patients) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172709-GO-RFQ / Washing machine – (8Kg) 2 Unit (Opening Up New Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Isolation Unit For COVID 19 IDA / 65950 Post Limited 832.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Suspected patients) ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172710-GO-RFQ / Fabric – Tapata materials – 60” 1000m (Accessories Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- for Personal Protection Kit) IDA / 65950 Post Limited 763.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 procured by Kalubowila ation Hospital during Covid 19 period LK-MOH-172711-GO-RFQ / Fabric – Mask Materials – 60” 76 m (Accessories for Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Personal Protection Kit) IDA / 65950 Post Limited 36.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 procured by Kalubowila ation Hospital during Covid 19 period LK-MOH-172712-GO-RFQ / Elastic – ¾” (100m) Roll 9 Pending (Accessories for Personal Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 65950 Post Limited 92.00 0.00 Implement Protection Kit) procured by COVID-19 Response Quotations Envelope 13 01 15 ation Kalubowila Hospital during Covid 19 period LK-MOH-172713-GO-RFQ / Personal Protecting Pending overall 200 Unit ( for Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 65950 Post Limited 621.00 0.00 Implement Isolation Unit) procured by COVID-19 Response Quotations Envelope 13 01 15 ation Kalubowila Hospital during Covid 19 period LK-MOH-172714-GO-RFQ / Bed Sheet 90"x54" 500 Pending Numbers ( for Isolation Unit) Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 65950 Post Limited 1,303.00 0.00 Implement procured by Kalubowila COVID-19 Response Quotations Envelope 13 01 15 ation Hospital during Covid 19 period LK-MOH-172715-GO-RFQ / Sanitary gel – 250 ml 25 bottle (For COVID 19 Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Suspected Patient's Isolation IDA / 65950 Post Limited 86.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Unit) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172716-GO-RFQ / Plastic Cup 500 unit (For Pending COVID 19 Suspected Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 65950 Post Limited 13.00 0.00 Implement Patient's Isolation Unit) COVID-19 Response Quotations Envelope 13 01 15 ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172717-GO-RFQ / Plastic Spoon 500 unit (For Pending COVID 19 Suspected Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 65950 Post Limited 16.00 0.00 Implement Patient's Isolation Unit) COVID-19 Response Quotations Envelope 13 01 15 ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172718-GO-RFQ / Paper Serviette 50 pkt (For Pending COVID 19 Suspected Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IBRD / 90850 Post Limited 31.00 0.00 Implement Patient's Isolation Unit) COVID-19 Response Quotations Envelope 13 01 15 ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172719-GO-RFQ / Hand Wash 5L Can 100 nos (For COVID 19 Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Suspected Patient's Isolation IDA / 65950 Post Limited 3,289.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Unit) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172720-GO-RFQ / 3 Feet Polythene 163.35 m (For COVID 19 Suspected Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- Patient's Isolation Unit) IDA / 65950 Post Limited 758.00 0.00 Implement COVID-19 Response Quotations Envelope 13 24 01 procured by Kalubowila ation Hospital during Covid 19 period LK-MOH-172721-GO-RFQ / Washing Powder – Surf excel 50Kg (For COVID 19 Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- Suspected Patient's Isolation IDA / 65950 Post Limited 87.00 0.00 Implement COVID-19 Response Quotations Envelope 13 24 01 Unit) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172722-GO-RFQ / Hand wash 5 L can (For Pending COVID 19 Suspected Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 65950 Post Limited 579.00 0.00 Implement Patient's Isolation Unit) COVID-19 Response Quotations Envelope 13 01 15 ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172723-GO-RFQ / Washing Powder 100 Kg Pending (For COVID 19 Suspected Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 116.00 0.00 Implement Patient's Isolation Unit) COVID-19 Response Quotations Envelope 13 24 01 ation procured by Kalubowila Hospital during Covid 19 period Page 4 LK-MOH-172724-GO-RFQ / Grocery Bag (10x7) 15000 nos (For COVID 19 Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- Suspected Patient's Isolation IDA / 65950 Post Limited 62.00 0.00 Implement COVID-19 Response Quotations Envelope 13 24 01 Unit) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172725-GO-RFQ / Shopping bag (18 x 4x14) 15000 nos (For COVID 19 Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- Suspected Patient's Isolation IDA / 65950 Post Limited 99.00 0.00 Implement COVID-19 Response Quotations Envelope 13 24 01 Unit) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172726-GO-RFQ / Lunch Sheet 2500 nos (For Pending COVID 19 Suspected Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 34.00 0.00 Implement Patient's Isolation Unit) COVID-19 Response Quotations Envelope 13 24 01 ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172727-GO-RFQ / Card board lunch box 500nos (For COVID 19 Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- Suspected Patient's Isolation IDA / 65950 Post Limited 45.00 0.00 Implement COVID-19 Response Quotations Envelope 13 24 01 Unit) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172728-GO-RFQ / AA Battery 5000 nos (For Pending COVID 19 Suspected Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- IDA / 65950 Post Limited 1,193.00 0.00 Implement Patient's Isolation Unit) COVID-19 Response Quotations Envelope 13 24 01 ation procured by Kalubowila Hospital during Covid 19 period LK-MOH-172729-GO-RFQ / Adult Diapers XL 10’s 50 nos (For COVID 19 Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-06- 2020-07- Suspected Patient's Isolation IDA / 65950 Post Limited 46.00 0.00 Implement COVID-19 Response Quotations Envelope 13 24 01 Unit) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-172730-GO-RFQ / Plastic Bin Heavy Duty 120L 3 nos (For COVID 19 Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- Suspected Patient's Isolation IDA / 65950 Post Limited 78.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Unit) procured by ation Kalubowila Hospital during Covid 19 period LK-MOH-174708-GO-UN / Procurement of COVID-19 Component 1: Emergency UN Agencies 2020-05- 2020-03- 2020-05- 2020-04- 2020-06- 2020-05- 2020-12- related Surgical/Medical IDA / 65950 Post Direct 35,240,003.58 35,240,003.58 Signed COVID-19 Response (Direct) 21 30 26 03 30 26 27 Consumables and PPE through UNICEF LK-MOH-176190-GO-RFB Component 1: Emergency Single Stage - One 2020-06- 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- / Supply and Delivery of 25 IDA / 65950 Post Request for Bids Open - National 1,500,000.00 1,217,431.77 Signed COVID-19 Response Envelope 02 01 03 17 17 01 15 29 26 28 Nos Brand New Double Cabs LK-MOH-171620-GO-RFB Component 1: Emergency Single Stage - One 2020-05- 2020-05- 2020-06- 2020-07- 2020-08- 2021-02- / Supply and Delivery of 25 IBRD / 90850 Post Request for Bids Limited 1,500,000.00 0.00 Canceled COVID-19 Response Envelope 14 19 18 18 22 18 Nos Brand New Double Cabs LK-MOH-176195-GO-RFB Component 1: Emergency Single Stage - One 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-08- / Supply And Delivery of IDA / 65950 Post Request for Bids Open - National 1,300,000.00 1,286,529.24 Signed COVID-19 Response Envelope 08 26 09 23 14 08 23 05 26 20 805 Nos Brand New Motor Bicycles LK-MOH-171742-GO-RFB Component 1: Emergency Single Stage - One 2020-05- 2020-06- 2020-07- 2020-07- 2020-09- 2021-03- / Supply And Delivery of IBRD / 90850 Post Request for Bids Limited 1,300,000.00 0.00 Canceled COVID-19 Response Envelope 27 01 01 31 04 03 805 Nos Brand New Motor Bicycles LK-MOH-176198-GO-RFB Under Component 1: Emergency Open - Single Stage - One 2020-06- 2021-02- 2020-06- 2021-04- 2020-08- 2020-09- 2020-10- 2020-11- / Supply and Delivery of IDA / 65950 Post Request for Bids 2,800,000.00 0.00 Implement COVID-19 Response International Envelope 24 12 29 05 10 09 14 28 2087 Nos Brand New ation Scooters LK-MOH-171743-GO-RFB Component 1: Emergency Single Stage - One 2020-06- 2020-06- 2020-07- 2020-08- 2020-09- 2021-03- / Supply and Delivery of IBRD / 90850 Post Request for Bids Limited 2,800,000.00 0.00 Canceled COVID-19 Response Envelope 10 15 15 14 18 17 2087 Nos Brand New Scooters LK-MOH-181002-GO-RFQ Pending / Disposable Face Marks Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- IDA / 65950 Post Limited 4,000.00 0.00 Implement procured by Badulla PGH G COVID-19 Response Quotations Envelope 25 23 06 ation during Covid 19 period LK-MOH-181003-GO-RFQ Pending / 05 No of Steel Beds Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- IDA / 65950 Post Limited 711.00 0.00 Implement procured by Badulla PGH G COVID-19 Response Quotations Envelope 25 23 06 ation during Covid 19 period LK-MOH-181004-GO-RFQ Pending / 04 Nos Washing Machines Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- IDA / 65950 Post Limited 885.00 0.00 Implement procured by Badulla PGH G COVID-19 Response Quotations Envelope 25 23 06 ation during Covid 19 period LK-MOH-181005-GO-RFQ Pending / 02 Nos Refrigerators Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- IDA / 65950 Post Limited 541.00 0.00 Implement procured by Badulla PGH G COVID-19 Response Quotations Envelope 25 23 06 ation during Covid 19 period LK-MOH-181068-GO-RFQ Pending / 10 Nos Mobile Phones Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- IDA / 65950 Post Limited 85.00 0.00 Implement procured by Badulla PGH G COVID-19 Response Quotations Envelope 26 24 07 ation during Covid 19 period LK-MOH-181069-GO-RFQ Pending / 250 Mtr Poplin Material Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- IDA / 65950 Post Limited 152.00 0.00 Implement procured by Badulla PGH G COVID-19 Response Quotations Envelope 26 24 07 ation during Covid 19 period LK-MOH-181071-GO-RFB / Supply, Installation and Pending Component 1: Emergency Single Stage - One 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2020-11- Commissioning of 05 Units IDA / 65950 Post Request for Bids Open - National 51,710.00 0.00 Implement COVID-19 Response Envelope 21 26 07 06 11 25 Ventilators procured Badulla ation PGH G during Covid 19 period LK-MOH-181072-GO-RFB Pending / 08 Nos Autoclave table Component 1: Emergency Single Stage - One 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2020-11- IDA / 65950 Post Request for Bids Open - National 20,421.00 0.00 Implement tops procured by Badulla COVID-19 Response Envelope 21 26 07 06 11 25 ation PGH G during Covid 19 period LK-MOH-181073-GO-RFB Pending / Bio-safety Cabinet for Mini Component 1: Emergency Single Stage - One 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2020-11- IDA / 65950 Post Request for Bids Open - National 9,500.00 0.00 Implement Lab procured by Badulla COVID-19 Response Envelope 21 26 07 06 11 25 ation PGH G during Covid 19 period LK-MOH-181074-GO-RFB / Medical Laboratory Pending Component 1: Emergency Single Stage - One 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2020-11- Centrifuge for Mini Lab IDA / 65950 Post Request for Bids Open - National 5,120.00 0.00 Implement COVID-19 Response Envelope 21 26 07 06 11 25 procured by Badulla PGH G ation during Covid 19 period LK-MOH-181075-GO-RFB Pending Component 1: Emergency Single Stage - One 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2020-11- / Bench Top Fully IDA / 65950 Post Request for Bids Open - National 15,785.00 0.00 Implement COVID-19 Response Envelope 21 26 07 06 11 25 Automated Biochemistry ation Analyzer LK-MOH-181155-GO-DIR / Fully Automated Pending Component 1: Emergency 2020-06- 2020-06- 2020-07- 2020-07- Biochemistry Analyzer for IDA / 65950 Post Direct Selection 1,960.00 0.00 Implement COVID-19 Response 22 27 11 25 Mini Lab (Reagents) ation procured by Badulla PGH G during Covid 19 period LK-MOH-181157-GO-DIR Pending / 05 Nos Stethoscope Component 1: Emergency 2020-06- 2020-06- 2020-07- 2020-07- IDA / 65950 Post Direct Selection Direct 58.00 0.00 Implement procured by Badulla PGH G COVID-19 Response 22 27 11 25 ation during Covid 19 period LK-MOH-181196-GO-DIR Pending / 05 Nos BP Meters Component 1: Emergency 2020-06- 2020-06- 2020-07- 2020-07- IDA / 65950 Post Direct Selection Direct 101.00 0.00 Implement procured by Badulla PGH G COVID-19 Response 22 27 11 25 ation during Covid 19 period LK-MOH-181197-GO-RFQ Pending / 200 Nos N 95 Masks Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- IDA / 65950 Post Limited 342.00 0.00 Implement procured by Badulla PGH G COVID-19 Response Quotations Envelope 27 21 04 ation during Covid 19 period LK-MOH-181198-GO-DIR Pending / 10 Nos Stethoscopes Component 1: Emergency 2020-06- 2020-06- 2020-07- 2020-07- IDA / 65950 Post Direct Selection Direct 116.00 0.00 Implement procured by Badulla PGH G COVID-19 Response 22 27 11 25 ation during Covid 19 period LK-MOH-181200-GO-DIR Pending / 04 Nos BP Meter procured Component 1: Emergency 2020-06- 2020-06- 2020-07- 2020-07- IDA / 65950 Post Direct Selection Direct 272.00 0.00 Implement by Badulla PGH G during COVID-19 Response 22 27 11 25 ation Covid 19 period LK-MOH-181201-GO-DIR / 07 Nos Digital clinical Pending Component 1: Emergency 2020-06- 2020-06- 2020-07- 2020-07- Thermometer procured by IDA / 65950 Post Direct Selection Direct 33.00 0.00 Implement COVID-19 Response 22 27 11 25 Badulla PGH G during Covid ation 19 period LK-MOH-182740-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- / Dust Bin 120L procured by IDA / 65950 Post Limited 270.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 MOH supplies division ation LK-MOH-182741-GO-RFQ / Plastic chair with out arm Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- -50 Nos & Water Dispenser IDA / 65950 Post Limited 1,622.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 - 14 Nos procured by MOH ation Procurement Division LK-MOH-182742-GO-RFQ Pending / 131 Nos Bed side Lockers Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 10,810.00 0.00 Implement procured by MOH Supplies COVID-19 Response Quotations Envelope 11 15 29 ation Division LK-MOH-182743-GO-RFQ / Wheel chairs 03 Nos , Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- Oxygen cart - 05 Nos & IBRD / 90850 Post Limited 2,703.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 Saline Stand - 36 Nos ation procured by MOH supplies division LK-MOH-182746-GO-RFQ Pending / Over Bed Table - 36 Nos Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 2,703.00 0.00 Implement procured by MOH supplies COVID-19 Response Quotations Envelope 11 15 29 ation division during Covid period LK-MOH-182747-GO-RFQ / Patient Trolley - 05 Nos & Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- Drug Trolley 09 Nos IDA / 65950 Post Limited 1,622.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 procured by MOH supplies ation division during Covid period LK-MOH-182748-GO-RFQ Pending / Hospital Beds - 151 Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 19,919.00 0.00 Implement procured by MOH supplies COVID-19 Response Quotations Envelope 11 15 29 ation division during Covid period LK-MOH-182751-GO-RFQ Pending / Bedside Lockers - 176 Nos Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 13,514.00 0.00 Implement procured by MOH supplies COVID-19 Response Quotations Envelope 11 15 29 ation division during Covid period LK-MOH-182754-GO-RFQ Pending / Mattress - 150 Nos Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 3,243.00 0.00 Implement procured by MOH supplies COVID-19 Response Quotations Envelope 11 15 29 ation division during Covid period LK-MOH-182756-GO-RFQ Pending / Infrared thermometers - Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 430.00 0.00 Implement 05 Nos procured by NHSL COVID-19 Response Quotations Envelope 11 15 29 ation during Covid period LK-MOH-182762-GO-RFQ Pending / Ventilator Circuits - 300 Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 2,270.00 0.00 Implement Nos are procured by NHSL COVID-19 Response Quotations Envelope 11 15 29 ation during Covid period. LK-MOH-182763-GO-RFQ / Flexible Breathing System Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- with Water Traps - 250 Nos IDA / 65950 Post Limited 3,378.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 procured by NHSL during ation Covid period. LK-MOH-182764-GO-RFQ Pending / Oxygen Marks - 1,000 nos Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 4,054.00 0.00 Implement procured by NHSL during COVID-19 Response Quotations Envelope 11 15 29 ation Covid period. LK-MOH-182765-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- / Eco Masks 80 Nos IDA / 65950 Post Limited 541.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 procured by NHSL during ation Covid period. LK-MOH-182766-GO-RFQ / Goggles for emergency Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- infectious condition - 1000 IDA / 65950 Post Limited 4,108.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 Nos procured by NHSL ation during Covid period. LK-MOH-182769-GO-RFQ / Personnel Protective Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- Equipment - 250 Sets IDA / 65950 Post Limited 10,584.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 procured by NHSL during ation Covid period. LK-MOH-182770-GO-RFQ / Bacterial Filter without Pending Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- heat moisture - 3,000 Nos IDA / 65950 Post Limited 3,514.00 0.00 Implement COVID-19 Response Quotations Envelope 11 15 29 procured by NHSL during ation Covid period. LK-MOH-182771-GO-RFQ Pending / Shoe Covers - 1,000 Nos Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 243.00 0.00 Implement procured by NHSL during COVID-19 Response Quotations Envelope 11 15 29 ation Covid period. LK-MOH-182772-GO-RFQ Pending / Polythene Bags - 161,150 Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 26,649.00 0.00 Implement Kgs procured by NHSL COVID-19 Response Quotations Envelope 11 15 29 ation during Covid period. LK-MOH-182778-GO-RFQ Pending / N 95 Face Masks - 1,000 Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 4,865.00 0.00 Implement Nos procured by NHSL COVID-19 Response Quotations Envelope 11 15 29 ation during Covid period. LK-MOH-182780-GO-RFQ Pending / Infrared Thermometer - Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 3,438.00 0.00 Implement 40 Nos procured by NHSL COVID-19 Response Quotations Envelope 11 15 29 ation during Covid period. LK-MOH-182781-GO-RFQ Pending / Disposable Coveralls and Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-08- IDA / 65950 Post Limited 27,568.00 0.00 Implement Items - 4,500 Nos procured COVID-19 Response Quotations Envelope 11 15 29 ation by NHSL during Covid period. LK-MOH-182782-GO-RFB Pending / Pulse Oximeter - 57 Nos Component 1: Emergency Single Stage - One 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 31,735.00 0.00 Implement procured by BME Division COVID-19 Response Envelope 06 11 01 16 06 20 ation during Covid period. LK-MOH-182783-GO-RFB Pending / Infusion Pumps - 108 Nos Component 1: Emergency Single Stage - One 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 32,692.00 0.00 Implement procured by BME Division COVID-19 Response Envelope 06 11 01 15 05 19 ation during Covid period LK-MOH-182785-GO-RFB Pending / Syringe Pumps - 38 Nos Component 1: Emergency Single Stage - One 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 16,895.00 0.00 Implement procured by BME Division COVID-19 Response Envelope 06 11 01 15 05 19 ation during Covid period LK-MOH-182786-GO-RFQ / Suction Apparatus - 57 Component 1: Emergency Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 60,389.00 60,307.68 Signed Nos procured by BME COVID-19 Response Envelope 06 01 11 01 01 10 08 11 05 15 20 Division during Covid period LK-MOH-182787-GO-RFB / Defibrillators - 11 Nos Component 1: Emergency Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 52,859.00 52,780.98 Signed procured by BME Division COVID-19 Response Envelope 06 01 11 01 01 07 15 08 05 10 20 during Covid period LK-MOH-182788-GO-RFB / High Floor Oxygen Meters Component 1: Emergency Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 251,622.00 251,248.04 Signed - 38 Nos procured by BME COVID-19 Response Envelope 06 01 11 08 01 09 15 11 05 14 20 Division during Covid period LK-MOH-182789-GO-RFB / Bronchoscopy Machine 25 Component 1: Emergency Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 214,865.00 214,574.87 Signed Nos procured by BME COVID-19 Response Envelope 06 01 11 01 01 10 08 11 29 14 12 Division during Covid period LK-MOH-182790-GO-RFB / Blood Gas Machines - Component 1: Emergency Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 177,295.00 177,056.01 Signed 10Nos procured by BME COVID-19 Response Envelope 06 01 11 01 01 10 15 11 05 14 19 Division during Covid period LK-MOH-182791-GO-RFB Pending / Two Concentrates - 25 Component 1: Emergency Single Stage - One 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 22,297.00 0.00 Implement Nos procured by BME COVID-19 Response Envelope 06 11 01 15 05 26 ation Division during Covid period Page 5 LK-MOH-182792-GO-RFB / CRRT Machine 02 Nos Component 1: Emergency Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-10- IDA / 65950 Post Request for Bids Limited 69,189.00 73,404.37 Signed procured by BME Division COVID-19 Response Envelope 06 01 11 01 01 11 16 11 13 14 04 during Covid period LK-MOH-182794-GO-RFB / CRRT Machine - 03 Nos Component 1: Emergency Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-10- IDA / 65950 Post Request for Bids Limited 97,297.00 100,391.27 Signed procured by BME Division COVID-19 Response Envelope 06 01 11 01 01 10 15 11 12 11 03 during Covid period LK-MOH-182795-GO-RFB Pending / Suction Apparatus - 32 Component 1: Emergency Single Stage - One 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2021-03- IDA / 65950 Post Request for Bids Limited 33,297.00 0.00 Implement Nos procured by BME COVID-19 Response Envelope 06 11 01 15 19 18 ation Division during Covid period LK-MOH-182796-GO-RFB Pending / Blood Pressure Apparatus Component 1: Emergency Single Stage - One 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Request for Bids Limited 1,903.00 0.00 Implement - 32 Nos procured by BME COVID-19 Response Envelope 06 11 01 15 05 06 ation Division during Covid period LK-MOH-182865-GO-RFQ / Printing and Delivery of Pending 250,000 Posters on Component 1: Emergency Request for Single Stage - One 2020-07- 2020-08- 2020-09- IDA / 65950 Post Limited 32,436.00 0.00 Implement Adapting to Normal day-to- COVID-19 Response Quotations Envelope 14 17 01 ation day life without being infected by Covid-19 LK-MOH-183669-GO-DIR / Provision of meals and Pending refreshments for the staff Component 1: Emergency 2020-07- 2020-07- 2020-08- 2022-04- IDA / 65950 Post Direct Selection Direct 8,349.00 0.00 Implement involved in the PCR testing COVID-19 Response 14 19 09 01 ation at BIA Katunayake for the period of two months LK-MOH-185535-GO-RFQ Pending / Purchase of Paint Items Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-11- IDA / 65950 Post Limited 74,730.00 0.00 Implement required for Quarantine COVID-19 Response Quotations Envelope 02 20 04 ation centers LK-MOH-185536-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2021-03- / Purchase of Septic Tanks IDA / 65950 Post Limited 3,566.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 12 for Quarantine centers ation LK-MOH-185537-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-11- / Purchase of Tools for IDA / 65950 Post Limited 12,570.00 0.00 Implement COVID-19 Response Quotations Envelope 02 20 04 Quarantine centers ation LK-MOH-185539-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2021-03- / Purchase of Plywood Sheet IDA / 65950 Post Limited 2,744.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 12 for Quarantine centers ation LK-MOH-185540-GO-RFQ Pending / Purchase of 2,702 Nos Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- IDA / 65950 Post Limited 14,221.00 0.00 Implement Cement Bags for Quarantine COVID-19 Response Quotations Envelope 02 13 13 ation centers LK-MOH-185542-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-08- 2020-10- / Purchase of Tile for IDA / 65950 Post Limited 8,050.00 0.00 Implement COVID-19 Response Quotations Envelope 02 30 14 Quarantine centers ation LK-MOH-185543-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-08- 2020-10- / Purchase of Sanitary IDA / 65950 Post Limited 94,668.00 0.00 Implement COVID-19 Response Quotations Envelope 02 30 14 Fittings for Quarantine ation centers LK-MOH-185546-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-08- 2020-10- / Purchase of Timber for IDA / 65950 Post Limited 40,000.00 0.00 Implement COVID-19 Response Quotations Envelope 02 30 14 Quarantine centers ation LK-MOH-185547-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-08- 2020-10- / Purchase of Zn/Aluminium IDA / 65950 Post Limited 37,280.00 0.00 Implement COVID-19 Response Quotations Envelope 02 30 14 Sheet for Quarantine centers ation LK-MOH-185553-GO-RFQ / Purchase of Yard Items Pending (River Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- IDA / 65950 Post Limited 32,315.00 0.00 Implement Sand/Metal/Rubble/Cement COVID-19 Response Quotations Envelope 02 13 13 ation Blocks/Engineering Bricks/Precast Concrete Grill) for Quarantine centers LK-MOH-185556-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of Electrical IDA / 65950 Post Limited 22,616.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 Cables for Quarantine ation centers LK-MOH-185559-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of Ceiling/wall IDA / 65950 Post Limited 96,480.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 Fan for Quarantine centers ation LK-MOH-185561-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of Electrical IDA / 65950 Post Limited 46,621.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 Fittings for Quarantine ation centers LK-MOH-185562-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of Hardware IDA / 65950 Post Limited 121,628.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 Items for Quarantine centers ation LK-MOH-185567-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of Steel for IDA / 65950 Post Limited 38,437.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 Quarantine centers ation LK-MOH-185569-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of Aluminium IDA / 65950 Post Limited 16,731.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 Item for Quarantine centers ation LK-MOH-185577-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of P.V.C. Items IDA / 65950 Post Limited 50,941.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 for Quarantine centers ation LK-MOH-185580-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of Water Tank IDA / 65950 Post Limited 6,043.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 for Quarantine centers ation LK-MOH-185582-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of Concrete IDA / 65950 Post Limited 1,272.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 Mixture for Quarantine ation centers LK-MOH-185584-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- / Purchase of GAS Items for IDA / 65950 Post Limited 442.00 0.00 Implement COVID-19 Response Quotations Envelope 02 13 13 Quarantine centers ation LK-MOH-186237-GO-RFB / 200,000 Nos Covid 19 Under Real Time PCR Kits, 200,000 Component 1: Emergency Open - Single Stage - One 2020-08- 2020-09- 2020-08- 2020-09- 2020-08- 2020-09- 2020-10- 2020-12- IDA / 65950 Post Request for Bids 4,273,232.00 0.00 Implement Nos Extraction Kits and COVID-19 Response International Envelope 13 10 17 10 31 07 05 04 ation other consumable items required for PCR Tests LK-MOH-188260-GO-RFQ / 20 Mos Steel Towel Racks Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2021-03- for Kalubowila Hospital IDA / 65950 Post Limited 237.00 0.00 Implement COVID-19 Response Quotations Envelope 16 20 19 Doctors quarters to face ation Covid 19 Pandemic LK-MOH-188396-GO-RFQ / Supply of PCR reagent N28 Realstr R SARS Cov-2 Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-11- RT –PCR Kit RUo,96 IDA / 65950 Post Limited 21,891.00 0.00 Implement COVID-19 Response Quotations Envelope 17 05 19 Reactions and necessary ation consumables procured by Ragama Teaching Hospital during Covid period LK-MOH-188398-GO-RFQ / Supply of PCR reagent Pending N28Realstr R SARS Cov-2 Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-11- IDA / 65950 Post Limited 4,842.00 0.00 Implement RT –PCR Kit RUo,96 COVID-19 Response Quotations Envelope 17 05 19 ation Reactions procured by Ragama Teaching Hospital during Covid period LK-MOH-188399-GO-RFQ / Supply of PCR reagent Commercial vial RAN Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-11- extraction kit to extract viral IDA / 65950 Post Limited 3,354.00 0.00 Implement COVID-19 Response Quotations Envelope 17 05 19 RAN procured by Ragama ation Teaching Hospital during Covid period LK-MOH-188400-GO-RFQ / Supply of PCR reagent Commercial vial RAN Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-11- extraction kit to extract viral IDA / 65950 Post Limited 22,226.00 0.00 Implement COVID-19 Response Quotations Envelope 17 05 19 RAN procured by Ragama ation Teaching Hospital during Covid period LK-MOH-188402-GO-RFQ / Supply of Ethanol Absolute Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- 99.9% procured by Ragama IDA / 65950 Post Limited 1,474.00 0.00 Implement COVID-19 Response Quotations Envelope 17 05 06 Teaching Hospital during ation Covid period LK-MOH-188413-GO-DIR / 01 Nos Infrared Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- Thermometers, procured by IDA / 65950 Post Direct Selection Direct 158.00 0.00 Implement COVID-19 Response 12 17 31 07 Ragama Teaching Hospital ation during Covid period. LK-MOH-188414-GO-DIR Pending / 06 Nos Infrared Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 726.00 0.00 Implement Thermometers procured by COVID-19 Response 12 17 31 07 ation Ragama Teaching Hospital during Covid period LK-MOH-188415-GO-DIR Pending / 04 Nos Infrared Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 484.00 0.00 Implement Thermometers procured by COVID-19 Response 12 17 31 07 ation Ragama Teaching Hospital during Covid period LK-MOH-188416-GO-DIR Pending / 250 Nos N95 Mask Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 1,645.00 0.00 Implement Original procured by COVID-19 Response 12 17 31 07 ation Ragama Teaching Hospital during Covid period LK-MOH-188417-GO-DIR Pending / 05 Nos Sanitizer 5L (Hand Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 289.00 0.00 Implement ) procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period LK-MOH-188418-GO-DIR / 30 Nos Scissor & Stapler Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- Machine procured by IDA / 65950 Post Direct Selection Direct 52.00 0.00 Implement COVID-19 Response 12 17 31 07 Ragama Teaching Hospital ation during Covid period LK-MOH-188434-GO-DIR Pending / 250 Nos N95 Mask Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 1,645.00 0.00 Implement (Original) procured by COVID-19 Response 12 17 31 07 ation Ragama Teaching Hospital during Covid period LK-MOH-188435-GO-DIR / procured by Ragama Teaching Hospital during Covid period Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 237.00 0.00 Implement COVID-19 Response 12 17 31 07 ation 2500 Nos Disposable Gloves (powder Free) procured by Ragama Teaching Hospital during Covid period LK-MOH-188437-GO-DIR / 06 Nos Lacy S Zip Bag Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- Gallon (COVID Lab) IDA / 65950 Post Direct Selection Direct 23.00 0.00 Implement COVID-19 Response 12 17 31 07 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188443-GO-DIR / 25 Nos Rubberized Coir Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- Mattress procured by IDA / 65950 Post Direct Selection Direct 651.00 0.00 Implement COVID-19 Response 12 17 31 07 Ragama Teaching Hospital ation during Covid period. LK-MOH-188447-GO-DIR Pending / Hand Wash item for ward Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 1,416.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. LK-MOH-188449-GO-DIR Pending / 05 Nos Civilizing Fans Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 232.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period LK-MOH-188451-GO-DIR Pending / 03 Nos Air Purifier Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 174.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. LK-MOH-188452-GO-DIR Pending / Lasy Zip bag for covid lab Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 19.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. LK-MOH-188453-GO-DIR Pending / Vehicle Battery procured Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 118.00 0.00 Implement by Ragama Teaching COVID-19 Response 12 17 31 07 ation Hospital during Covid period. LK-MOH-188454-GO-DIR / Garbage Bins (covid Lab & Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- ward) procured by Ragama IDA / 65950 Post Direct Selection Direct 683.00 0.00 Implement COVID-19 Response 12 17 31 07 Teaching Hospital during ation Covid period. LK-MOH-188455-GO-DIR / 06 Nos Wall Fan for Covid Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- ward procured by Ragama IDA / 65950 Post Direct Selection Direct 152.00 0.00 Implement COVID-19 Response 12 17 31 07 Teaching Hospital during ation Covid period. LK-MOH-188457-GO-DIR / Electrical Accessories Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- (Repair of MICU) procured IDA / 65950 Post Direct Selection Direct 578.00 0.00 Implement COVID-19 Response 12 17 31 07 by Ragama Teaching ation Hospital during Covid period. LK-MOH-188458-GO-DIR Pending / 3 KVA UPS for Covid Lab Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 342.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. LK-MOH-188460-GO-DIR Pending / 03 Nos Toner Cartridge Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 257.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. LK-MOH-188461-GO-DIR / 150 Nos Disposable Long Pending Sleeve Surgeon Gown Full Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 513.00 0.00 Implement Body Kit procured by COVID-19 Response 12 17 31 07 ation Ragama Teaching Hospital during Covid period. LK-MOH-188464-GO-DIR Pending / 250 Nos N 95 Mask Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 1,648.00 0.00 Implement Original procured by COVID-19 Response 12 17 31 07 ation Ragama Teaching Hospital during Covid period. LK-MOH-188466-GO-DIR Pending / 03 Nos Infrared Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 521.00 0.00 Implement Thermometers procured by COVID-19 Response 12 17 31 07 ation Ragama Teaching Hospital during Covid period. LK-MOH-188468-GO-DIR / 01 No Air Ventilation Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- System for covid ward IDA / 65950 Post Direct Selection Direct 4,499.00 0.00 Implement COVID-19 Response 12 17 31 07 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188485-GO-DIR / 10,000 Nos Supply of Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- Surgical Caps ( Lab & Other IDA / 65950 Post Direct Selection Direct 1,053.00 0.00 Implement COVID-19 Response 12 17 31 07 Unit) procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188486-GO-DIR / 150 Nos Supply of Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- Goggles ( Lab & ward) IDA / 65950 Post Direct Selection Direct 324.00 0.00 Implement COVID-19 Response 12 17 31 07 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188488-GO-DIR Pending / 200 Nos Swab (PCR Lab) Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 47.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. LK-MOH-188491-GO-DIR Pending / 50 Nos Safety Goggles( Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 329.00 0.00 Implement ward) procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. Page 6 LK-MOH-188494-GO-DIR / 2019 Nos Safety Goggles ( Pending Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- Ward & Unit) procured by IDA / 65950 Post Direct Selection Direct 438.00 0.00 Implement COVID-19 Response 12 17 31 07 Ragama Teaching Hospital ation during Covid period. LK-MOH-188495-GO-DIR Pending / 18 Nos N95 Masks Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 171.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. LK-MOH-188496-GO-DIR Pending / 300 Nos Oxypura Masks Component 1: Emergency 2020-08- 2020-08- 2020-08- 2020-09- IDA / 65950 Post Direct Selection Direct 268.00 0.00 Implement procured by Ragama COVID-19 Response 12 17 31 07 ation Teaching Hospital during Covid period. LK-MOH-188498-GO-RFQ / 410 Nos N95 Mask Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2021-04- (Wards & PCR Lab) procured IDA / 65950 Post Limited 2,697.00 0.00 Implement COVID-19 Response Quotations Envelope 17 12 10 by Ragama Teaching ation Hospital during Covid period. LK-MOH-188576-GO-DIR / 150 Nos Safety Goggles ( Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Ward & Unit ) procured by IDA / 65950 Post Direct Selection Direct 300.00 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period LK-MOH-188577-GO-DIR Pending / 20 Nos 3 M N95 Masks Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 208.00 0.00 Implement procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188578-GO-DIR Pending / 200 Nos Oxypura Mask Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 179.00 0.00 Implement (Staff ) procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188579-GO-DIR / 342 Mtr Sheeting Material Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- ( Made PPT Item ) procured IDA / 65950 Post Direct Selection Direct 405.00 0.00 Implement COVID-19 Response 13 18 01 08 by Ragama Teaching ation Hospital during Covid period. LK-MOH-188582-GO-DIR / 700 Mtrs Fabric formal Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- ware Tafata white coat IDA / 65950 Post Direct Selection Direct 332.00 0.00 Implement COVID-19 Response 13 18 01 08 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188583-GO-DIR / 05 Nos Sewing Machine Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- motor & Motor belt (PPE IDA / 65950 Post Direct Selection Direct 55.00 0.00 Implement COVID-19 Response 13 18 01 08 Item) procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188584-GO-DIR / 250 Nos Coconut Shell Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- spoons ( Covid Lab) IDA / 65950 Post Direct Selection Direct 26.00 0.00 Implement COVID-19 Response 13 18 01 08 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188585-GO-DIR / 311.8 Kg Polythene (for Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- PPE Item) procured by IDA / 65950 Post Direct Selection Direct 558.00 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period. LK-MOH-188587-GO-DIR / 10 Nos Zip Lock Bag ( Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- coved Lab) procured by IDA / 65950 Post Direct Selection Direct 7.70 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period. LK-MOH-188592-GO-DIR / 05 Nos Lacotogen milk Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- covid ward procured by IDA / 65950 Post Direct Selection Direct 16.00 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period. LK-MOH-188594-GO-DIR Pending / 05 Nos Cartridge ( PCR Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 50.00 0.00 Implement Lab) procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188596-GO-DIR / 08 Nos Zip Lock Bag ( PCR Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Lab) procured by Ragama IDA / 65950 Post Direct Selection Direct 7.60 0.00 Implement COVID-19 Response 13 18 01 08 Teaching Hospital during ation Covid period. LK-MOH-188597-GO-DIR Pending / 01 No Toner ( Lab ) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 24.00 0.00 Implement procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188598-GO-DIR Pending / 42 Kg Polythene ( PPT Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 75.00 0.00 Implement Item ) procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188621-GO-DIR Pending / 01 No UPS ( PCR Lab ) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 342.00 0.00 Implement procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188622-GO-DIR / 01 No Junkie Machine ( Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Made for PPE Item ) IDA / 65950 Post Direct Selection Direct 249.00 0.00 Implement COVID-19 Response 13 18 01 08 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188624-GO-DIR Pending / 01 No Refrigerator ( PCR Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 185.00 0.00 Implement Lab ) procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188625-GO-DIR / 10 Nos Transparent Sheet Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- ( ward ) procured by IDA / 65950 Post Direct Selection Direct 47.00 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period. LK-MOH-188626-GO-DIR / 480 Nos Mineral water Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Bottles ( ward ) procured by IDA / 65950 Post Direct Selection Direct 63.00 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period. LK-MOH-188630-GO-DIR Pending / Electrical Accessories ( Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 161.00 0.00 Implement MICU ) procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188633-GO-DIR / 450 Nos Water Bottle ( Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- coved Ward ) procured by IDA / 65950 Post Direct Selection Direct 83.00 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period. LK-MOH-188638-GO-DIR Pending / 10 Nos Toners ( PCR Lab Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 47.00 0.00 Implement ) procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188639-GO-DIR / 100 Nos Polythene Apron Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- for Ward & Unit procured IDA / 65950 Post Direct Selection Direct 145.00 0.00 Implement COVID-19 Response 13 18 01 08 by Ragama Teaching ation Hospital during Covid period. LK-MOH-188640-GO-DIR Pending / Aluminum Bars (MICU ) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 390.00 0.00 Implement procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188642-GO-DIR Pending / 300 Kg Polythene ( PPT Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 643.00 0.00 Implement Item ) procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188645-GO-DIR / 200 Nos Polythene Gown Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Hospital Staff procured by IDA / 65950 Post Direct Selection Direct 263.00 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period. LK-MOH-188664-GO-DIR / 01 No Toner Cartridge for Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- COVID Lab procured by IDA / 65950 Post Direct Selection Direct 42.00 0.00 Implement COVID-19 Response 13 18 01 08 Ragama Teaching Hospital ation during Covid period. LK-MOH-188667-GO-DIR Pending / Cotton Pillows -for ward Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 155.00 0.00 Implement procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188669-GO-DIR Pending / 130 Kg Polythene Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 95.20 0.00 Implement procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188670-GO-DIR Pending / 01 No AMP with USB Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 184.00 0.00 Implement procured by Ragama COVID-19 Response 13 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188794-GO-DIR Pending / Wax Ribbon & Art Paper Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 120.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188795-GO-DIR Pending / Pijama Kit ( Hospital Staff Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 52.00 0.00 Implement ) procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188796-GO-DIR Pending / Hardware item for Micu Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 13.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188797-GO-DIR Pending / Masking tape ( covid Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 45.00 0.00 Implement ward ) procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188799-GO-DIR / 130 Mtrs Black polythene Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- for wards procured by IDA / 65950 Post Direct Selection Direct 57.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period. LK-MOH-188800-GO-DIR / 625 Mtrs Polythene made Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- by PPE Item procured by IDA / 65950 Post Direct Selection Direct 1,154.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period. LK-MOH-188801-GO-DIR Pending / 32 Nos Transparent Sheet Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 147.00 0.00 Implement A4 procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188803-GO-DIR Pending / Electrical Item (MICU ) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 41.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188804-GO-DIR Pending / 30 Kg. Polythene procured Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 27.00 0.00 Implement by Ragama Teaching COVID-19 Response 14 19 02 09 ation Hospital during Covid period. LK-MOH-188805-GO-DIR Pending / 1 No NPU Toner for MICU Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 108.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188806-GO-DIR Pending / Hardware Item ( MICU ) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 455.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188811-GO-DIR Pending / 35 Nos Sponge Sheet Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 455.00 0.00 Implement MICU procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188813-GO-DIR Pending / Aluminium Bars (MICU ) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 175.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188814-GO-DIR / 36 Nos Mosquito Nets Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- (Coved ward ) procured by IDA / 65950 Post Direct Selection Direct 90.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period. LK-MOH-188815-GO-DIR / 03 Nos Exhaust fans for Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- MICU procured by Ragama IDA / 65950 Post Direct Selection Direct 79.00 0.00 Implement COVID-19 Response 14 19 02 09 Teaching Hospital during ation Covid period. LK-MOH-188816-GO-DIR / 175 Nos Polythene made Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Gown procured by Ragama IDA / 65950 Post Direct Selection Direct 46.00 0.00 Implement COVID-19 Response 14 19 02 09 Teaching Hospital during ation Covid period. LK-MOH-188818-GO-DIR / 1125 nOs Polythene made Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Gowns procured by Ragama IDA / 65950 Post Direct Selection Direct 196.00 0.00 Implement COVID-19 Response 14 19 02 09 Teaching Hospital during ation Covid period. LK-MOH-188820-GO-DIR Pending / Hardware Item (MICU) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 226.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188821-GO-DIR Pending / Zip lock bag procured by Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 11.00 0.00 Implement Ragama Teaching Hospital COVID-19 Response 14 19 02 09 ation during Covid period. LK-MOH-188824-GO-DIR / Taffeta & Elastic roll Made Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- PPE item procured by IDA / 65950 Post Direct Selection Direct 42.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period. LK-MOH-188825-GO-DIR Pending / 4000 Nos Transparent Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 189.00 0.00 Implement Sheets procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188827-GO-DIR / 300 Nos Polythene made Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Gowns procured by Ragama IDA / 65950 Post Direct Selection Direct 79.00 0.00 Implement COVID-19 Response 14 19 02 09 Teaching Hospital during ation Covid period. LK-MOH-188828-GO-DIR / 1210 Nos Polythene made Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Gowns procured by Ragama IDA / 65950 Post Direct Selection Direct 318.00 0.00 Implement COVID-19 Response 14 19 02 09 Teaching Hospital during ation Covid period. LK-MOH-188829-GO-DIR / Hardware Item & Electrical Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Item ( MICU ) procured by IDA / 65950 Post Direct Selection Direct 78.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period. LK-MOH-188831-GO-DIR / 264 Kg Polythene made Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- by PPE item procured by IDA / 65950 Post Direct Selection Direct 653.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period. LK-MOH-188833-GO-DIR / 200 Mtrs Rexine material Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- foe PPE item made procured IDA / 65950 Post Direct Selection Direct 477.00 0.00 Implement COVID-19 Response 14 19 02 09 by Ragama Teaching ation Hospital during Covid period. LK-MOH-188839-GO-DIR / Hardware items for Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- quarantine center procured IDA / 65950 Post Direct Selection Direct 213.00 0.00 Implement COVID-19 Response 14 19 02 09 by Ragama Teaching ation Hospital during Covid period. LK-MOH-188841-GO-DIR Pending / 450 Nos Water Bottles Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 83.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. Page 7 LK-MOH-188842-GO-DIR Pending / 02 Nos Toner Cartridges Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 47.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188844-GO-DIR Pending / 547 Nos Polythene Aprons Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 144.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188845-GO-DIR / Aluminium Bars Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- construction of a quarantine IDA / 65950 Post Direct Selection Direct 190.00 0.00 Implement COVID-19 Response 14 19 02 09 center procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188847-GO-DIR Pending / Polythene for covid ward Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 643.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188849-GO-DIR / 1000 Nos Polythene apron Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- for corona ward procured by IDA / 65950 Post Direct Selection Direct 263.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period. LK-MOH-188859-GO-DIR / 01 No Toner Cartridge for Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- wards procured by Ragama IDA / 65950 Post Direct Selection Direct 42.00 0.00 Implement COVID-19 Response 14 19 02 09 Teaching Hospital during ation Covid period. LK-MOH-188860-GO-DIR Pending / 150 Nos Cotton Pillows Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 155.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188863-GO-DIR / 53 Kg Polythene for PPE Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Item make procured by IDA / 65950 Post Direct Selection Direct 95.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period LK-MOH-188864-GO-DIR / Hi-tone Boss AMP with Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- USB and microphone IDA / 65950 Post Direct Selection Direct 184.00 0.00 Implement COVID-19 Response 14 19 02 09 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188866-GO-DIR / Wax Ribbon & Art Paper Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Above items are procured IDA / 65950 Post Direct Selection Direct 120.00 0.00 Implement COVID-19 Response 14 19 02 09 by Ragama Teaching ation Hospital during Covid period. LK-MOH-188867-GO-DIR Pending / Pijama Kit for Office Staff Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 52.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188868-GO-DIR / Surf Exel & Sunlight Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Powder (For SSSD & Covid- IDA / 65950 Post Direct Selection Direct 364.00 0.00 Implement COVID-19 Response 14 19 02 09 19 ward) procured by ation Ragama Teaching Hospital during Covid period. LK-MOH-188870-GO-DIR Pending / 04 Nos Tyre for Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 509.00 0.00 Implement Ambulance procured by COVID-19 Response 14 19 02 09 ation Ragama Teaching Hospital during Covid period. LK-MOH-188871-GO-DIR / Access Electronic Door Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Lock ( For Covid lab) IDA / 65950 Post Direct Selection Direct 575.00 0.00 Implement COVID-19 Response 14 19 02 09 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188873-GO-DIR Pending / Air Purifier (For Covid Lab) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 443.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period LK-MOH-188875-GO-DIR / 30 Kg Polythene for Apron Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- make for ward & unit IDA / 65950 Post Direct Selection Direct 90.00 0.00 Implement COVID-19 Response 14 19 02 09 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188876-GO-DIR / 30 Nos LED panel lights Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- for ward procured by IDA / 65950 Post Direct Selection Direct 76.00 0.00 Implement COVID-19 Response 14 19 02 09 Ragama Teaching Hospital ation during Covid period. LK-MOH-188879-GO-DIR Pending / 06 Nos Plywood sheets Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 114.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188882-GO-DIR Pending / 24 Nos chock (Philips) Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 88.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period LK-MOH-188883-GO-DIR Pending / 130 Ltrs Acid procured by Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 10.00 0.00 Implement Ragama Teaching Hospital COVID-19 Response 14 19 02 09 ation during Covid period. LK-MOH-188885-GO-DIR Pending / 01 No Lactogen Milk Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 3.00 0.00 Implement Powder procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188887-GO-DIR Pending / Electrical Accessories for Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 45.00 0.00 Implement Lab procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188888-GO-DIR Pending / Zip lock Bags PCR Lab Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 20.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188890-GO-DIR Pending / 06 Nos LED Bulbs -MICU Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 45.00 0.00 Implement procured by Ragama COVID-19 Response 14 19 02 09 ation Teaching Hospital during Covid period. LK-MOH-188895-GO-DIR Pending / 10 Nos LED Driver -Lab Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 21.00 0.00 Implement procured by Ragama COVID-19 Response 14 18 01 08 ation Teaching Hospital during Covid period. LK-MOH-188966-GO-DIR Pending / 04 Nos Mobile Phones Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 21.00 0.00 Implement procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-188973-GO-DIR / 01 Nob Pre Nan Milk Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Powder Tin procured by IDA / 65950 Post Direct Selection Direct 6.00 0.00 Implement COVID-19 Response 16 21 04 11 Ragama Teaching Hospital ation during Covid period. LK-MOH-188974-GO-DIR / 01 No Electrical Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Accessories for Lab IDA / 65950 Post Direct Selection Direct 14.00 0.00 Implement COVID-19 Response 16 21 04 11 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188976-GO-DIR / 05 Nos Lactogen Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- powdered milk for covid IDA / 65950 Post Direct Selection Direct 16.00 0.00 Implement COVID-19 Response 16 21 04 11 wards procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-188977-GO-DIR Pending / 02 Nos 40 Amp MCB Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 29.00 0.00 Implement procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-188981-GO-DIR Pending / 735 Nos Polythene Aprons Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 193.00 0.00 Implement procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-188982-GO-DIR / 102 Nos Nos Polythene Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Aprons procured by Ragama IDA / 65950 Post Direct Selection Direct 27.00 0.00 Implement COVID-19 Response 16 21 04 11 Teaching Hospital during ation Covid period. LK-MOH-188984-GO-DIR Pending / Mortine - Coved Lab Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 23.00 0.00 Implement procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-188986-GO-DIR / 99.65 Kg Polythene to Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- make PPE items procured by IDA / 65950 Post Direct Selection Direct 192.00 0.00 Implement COVID-19 Response 16 21 04 11 Ragama Teaching Hospital ation during Covid period. LK-MOH-188989-GO-DIR Pending / Sponge Sheets procured Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 108.00 0.00 Implement by Ragama Teaching COVID-19 Response 16 21 04 11 ation Hospital during Covid period. LK-MOH-188991-GO-DIR / 197.3 Kg Polythene to Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- make PPE Items procured by IDA / 65950 Post Direct Selection Direct 353.00 0.00 Implement COVID-19 Response 16 21 04 11 Ragama Teaching Hospital ation during Covid period. LK-MOH-189017-GO-DIR Pending / Electrical Accessories Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 34.00 0.00 Implement procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-189021-GO-DIR Pending / Network Accessories Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 23.00 0.00 Implement procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-189022-GO-DIR Pending / 167 Nos Polythene Aprons Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 44.00 0.00 Implement procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period LK-MOH-189023-GO-DIR Pending / Stapler Machine procured Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 13.00 0.00 Implement by Ragama Teaching COVID-19 Response 16 21 04 11 ation Hospital during Covid period LK-MOH-189024-GO-DIR Pending / Pijama Kit For hospital Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 489.00 0.00 Implement Staff procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-189025-GO-DIR Pending / Pijama Kit For hospital Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 739.00 0.00 Implement Staff procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-189026-GO-DIR Pending / Air Conditioner For Covid Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 655.00 0.00 Implement Lab procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-189027-GO-DIR / Ceiling fans for staff rest Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- rooms procured by Ragama IDA / 65950 Post Direct Selection Direct 232.00 0.00 Implement COVID-19 Response 16 21 04 11 Teaching Hospital during ation Covid period. LK-MOH-189028-GO-DIR Pending / Server rack for Pathology Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 522.00 0.00 Implement lab procured by Ragama COVID-19 Response 16 21 04 11 ation Teaching Hospital during Covid period. LK-MOH-189029-GO-DIR / 01 No Refrigerator for Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- covid ward procured by IDA / 65950 Post Direct Selection Direct 192.00 0.00 Implement COVID-19 Response 16 21 04 11 Ragama Teaching Hospital ation during Covid period. LK-MOH-189030-GO-DIR / Hardware Items for Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Maintenance unit procured IDA / 65950 Post Direct Selection Direct 404.00 0.00 Implement COVID-19 Response 16 21 04 11 by Ragama Teaching ation Hospital during Covid period. LK-MOH-189035-GO-RFQ / 500 Nos Extraction kits (Spinster Viral nucleic acid), 10000 Nos Novel corona PCR kit (Real-star SARS Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-11- –COV-2 RT PCR Kit ,Altona), IDA / 65950 Post Limited 250,125.00 0.00 Implement COVID-19 Response Quotations Envelope 22 17 16 10000 Nos Novel corona ation positive control (ITD)(CDC Protocol) and other consumables procured by Anuradhapura Teaching Hospital LK-MOH-189036-GO-RFQ / 20000 Nos PCR tubes 0.2ml, 10000 Nos PCR strip Pending tubes and caps 0.1 ml Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-11- IDA / 65950 Post Limited 23,447.00 0.00 Implement Qiagen, and 5000 Nos Viral COVID-19 Response Quotations Envelope 22 17 16 ation transport procured by Anuradhapura Teaching Hospital during Corona period LK-MOH-189037-GO-RFQ / 300 Nos Sample collection Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-11- tube e NAT procured by IDA / 65950 Post Limited 938.00 0.00 Implement COVID-19 Response Quotations Envelope 22 17 16 Anuradhapura Teaching ation Hospital during Corona period LK-MOH-189278-GO-DIR Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- / Surgical Gloves procured IDA / 65950 Post Direct Selection Direct 419,240.00 0.00 Implement COVID-19 Response 18 23 13 27 by MSD during Covid period ation LK-MOH-189281-GO-DIR / Examination Gloves Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- procured by MSD during IDA / 65950 Post Direct Selection Direct 196,830.00 0.00 Implement COVID-19 Response 18 23 13 27 Covid period from Sisili ation Projects Consortium (PVT) Ltd LK-MOH-189286-GO-DIR / Alcohol Based Hand Rub Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- procured by MSD during IDA / 65950 Post Direct Selection Direct 74,503.00 0.00 Implement COVID-19 Response 18 23 13 27 Covid period from Suraksha ation Pharma (Pvt) Ltd LK-MOH-189294-GO-DIR Pending / Alcohol Based Hand Rub Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 91,917.00 0.00 Implement procured by MSD during COVID-19 Response 18 23 13 27 ation Covid period from Medicom (Pvt) Ltd LK-MOH-189396-GO-RFQ Pending / 05 Nos Micro Pippets Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 5,053.00 0.00 Implement procured by Badulla General COVID-19 Response Quotations Envelope 24 12 26 ation Hospital during Covid period. LK-MOH-189397-GO-RFQ Pending / 01 No Heat Block procured Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 426.00 0.00 Implement by Badulla General Hospital COVID-19 Response Quotations Envelope 24 12 26 ation during Covid period. LK-MOH-189398-GO-RFQ Pending / 783 Nos Overall Kits Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 5,257.00 0.00 Implement procured by Badulla General COVID-19 Response Quotations Envelope 24 12 26 ation Hospital during Covid period. LK-MOH-189399-GO-RFQ Pending / 10 Nos Infrared Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 974.00 0.00 Implement Thermometers procured by COVID-19 Response Quotations Envelope 24 12 26 ation Badulla General Hospital during Covid period. LK-MOH-189738-GO-DIR Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- / Sisili Surgical Gloves IDA / 65950 Post Direct Selection Direct 196,830.00 0.00 Implement COVID-19 Response 21 26 16 30 procured by MSD during ation Covid period LK-MOH-189739-GO-DIR Pending / Medicon Alcohol Based Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 91,917.00 0.00 Implement Hand Rub procured by MSD COVID-19 Response 21 26 16 30 ation during Covid period LK-MOH-189740-GO-DIR Pending / Suraksha Alcohol Based Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 74,503.00 0.00 Implement Hand Rub procured by MSD COVID-19 Response 21 26 16 30 ation during Covid period from Suraksha LK-MOH-189744-GO-RFQ Pending / 2500 Nos Garbage Bags Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-09- IDA / 65950 Post Limited 183.00 0.00 Implement procured by IDH during COVID-19 Response Quotations Envelope 26 23 30 ation Covid period Page 8 LK-MOH-189745-GO-RFQ Pending / 100000 Nos Grocery Bags Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-09- IDA / 65950 Post Limited 274.00 0.00 Implement procured by IDH during COVID-19 Response Quotations Envelope 26 23 30 ation Covid period. LK-MOH-189746-GO-DIR Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- / 01 No PCT Kit procured by IDA / 65950 Post Direct Selection Direct 1,886.00 0.00 Implement COVID-19 Response 21 26 09 16 IDH during Covid period. ation LK-MOH-189760-GO-DIR / Sisili Surgical Gloves Component 1: Emergency 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 1,646,981.00 1,898,463.31 Signed procured by MSD during COVID-19 Response 21 01 26 07 16 14 30 Covid period from Sisili LK-MOH-189762-GO-DIR / Sisili Examination Gloves Component 1: Emergency 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 451,105.00 618,281.56 Signed procured by MSD during COVID-19 Response 21 01 26 01 16 08 30 Covid period from Sisili LK-MOH-189767-GO-RFQ / 300 Numbers Pillow Case Pending 26"x18" (Quarantine Ward Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- IDA / 65950 Post Limited 261.00 0.00 Implement No 5) procured by COVID-19 Response Quotations Envelope 26 23 07 ation Kalubowila Teaching Hospital during Covid period. LK-MOH-189768-GO-RFQ / 02 Nos Air Water Cooler Pending Model Smart 30+ Brand - Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- IDA / 65950 Post Limited 442.00 0.00 Implement Cello (For Isolation Unit) COVID-19 Response Quotations Envelope 26 23 07 ation procured by Kalubowila Teaching Hospital during Covid period. LK-MOH-189769-GO-RFQ / 01 No Phillips Hair Dryer Pending Machine (2 years Warranty) Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- IDA / 65950 Post Limited 42.00 0.00 Implement (For Isolation Unit) procured COVID-19 Response Quotations Envelope 26 23 07 ation by Kalubowila Teaching Hospital during Covid period. LK-MOH-189771-GO-RFQ / 01 No Washing Machine- Capacity 8kg Drying 6kg Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- 100% dryer. (For Isolation IDA / 65950 Post Limited 1,026.00 0.00 Implement COVID-19 Response Quotations Envelope 26 23 07 Unit) procured by ation Kalubowila Teaching Hospital during Covid period. LK-MOH-189772-GO-RFQ / 02 Nos 30m Magic Hose With Multiple Spray Gun and Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- tap Socket (For Isolation IDA / 65950 Post Limited 105.00 0.00 Implement COVID-19 Response Quotations Envelope 26 23 07 Unit) procured by ation Kalubowila Teaching Hospital during Covid period. LK-MOH-189773-GO-RFQ / 02 nos Folding tent 10x10 with power coated iron rod Pending and with a waterproof Component 1: Emergency Request for Single Stage - One 2020-08- 2020-09- 2020-10- IDA / 65950 Post Limited 284.00 0.00 Implement canvas cover (OPD triage COVID-19 Response Quotations Envelope 26 23 07 ation area) procured by Kalubowila Teaching Hospital during Covid period. LK-MOH-189775-GO-DIR / 50 Nos KDK Ceiling Fan Pending N56RG (For OPD triage area Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 203.00 0.00 Implement and Isolation Unit) procured COVID-19 Response 21 26 09 23 ation by Kalubowila Teaching Hospital during Covid period. LK-MOH-189776-GO-RFQ / 300 Mtrs 100% Cotton Sheeting Fabric- Blue Colour Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- ( Prepare doctors Overall to IDA / 65950 Post Limited 6,237.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 personal protection) ation procured by Kalubowila Teaching Hospital during Covid period. LK-MOH-189780-GO-RFQ / 50 Nos Inferred Pending thermometer (For Hospital Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 4,211.00 0.00 Implement words and clinics) procured COVID-19 Response Quotations Envelope 26 07 21 ation by Kalubowila Teaching Hospital during Covid period. LK-MOH-189786-GO-RFQ Pending / 12 Nos Banner Stand Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 123.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 26 07 21 ation Hospital during Covid period. LK-MOH-189809-GO-RFQ / Hardware items for Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Aluminium Partitioning work IDA / 65950 Post Limited 2,560.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 at Polonnaruwa Hospital ation during Covid period. LK-MOH-189811-GO-RFQ Pending / Hardware items for Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 102.00 0.00 Implement Plumbing at Polonnaruwa COVID-19 Response Quotations Envelope 26 07 21 ation Hospital during Covid period LK-MOH-189812-GO-RFQ Pending / 100 Nos PURIFIER Sanitizer Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 4,474.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 26 07 21 ation Hospital during Covid period LK-MOH-189814-GO-RFQ Pending / Electrical consumables Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 227.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 26 07 21 ation Hospital during Covid period LK-MOH-189816-GO-RFQ / 02 Nos Water heater Jug Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- and 04 Nos Emergency Led IDA / 65950 Post Limited 37.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 light procured by ation Polonnaruwa Hospital during Covid period LK-MOH-189819-GO-RFQ Pending / Tools & Accessories Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 1,997.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 26 07 21 ation Hospital during Covid period LK-MOH-189821-GO-RFQ Pending / 400 Pkts Photocopy Paper Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 1,455.00 0.00 Implement A 4 size procured by COVID-19 Response Quotations Envelope 26 07 21 ation Polonnaruwa Hospital during Covid period LK-MOH-189824-GO-RFQ / Shopping Bags, Plastic Pending Broom, Washing Powder and Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 3,984.00 0.00 Implement Hand Wash procured by COVID-19 Response Quotations Envelope 26 07 21 ation Polonnaruwa Hospital during Covid period LK-MOH-189827-GO-RFQ / 2000 Lts General Purpose (Teepole), 300 Ltrs Pending Disinfectant Cleaner (Lysol) Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 5,446.00 0.00 Implement and Toilet Bowl Cleaner COVID-19 Response Quotations Envelope 26 07 21 ation (Harpic) procured by Polonnaruwa Hospital during Covid period. LK-MOH-189831-GO-RFQ Pending / 120 Ltrs Clorex procured Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 993.00 0.00 Implement by Polonnaruwa Hospital COVID-19 Response Quotations Envelope 26 07 21 ation during Covid period. LK-MOH-189834-GO-RFQ / Electrical wiring consumables (Baton Holder/ Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Screw Nails/ Floater IDA / 65950 Post Limited 35.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 switch/Conduit joint ation Sockets) procured by Polonnaruwa Hospital during Covid period. LK-MOH-189837-GO-RFQ / Electrical Consumables (CFL Pin Type Bulbs/ Round Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Block/ Emergency Lamp/ IDA / 65950 Post Limited 146.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 Conduit bend & clips) ation procured by Polonnaruwa Hospital during Covid period. LK-MOH-189841-GO-RFQ / Cleaning Items (Mob Pending Bucket/Toilet Soap/ Ekal Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 1,287.00 0.00 Implement Broom/ Tile Brush) procured COVID-19 Response Quotations Envelope 26 07 21 ation by Polonnaruwa Hospital during Covid period. LK-MOH-189845-GO-RFQ / 30000 Nos Shopping Bags Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- & 50000 Grocery Bags IDA / 65950 Post Limited 574.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 procured by Polonnaruwa ation Hospital during Covid period. LK-MOH-189847-GO-RFQ / 80000 Nos Garbage Bags Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- -Black procured by IDA / 65950 Post Limited 3,952.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 Polonnaruwa Hospital ation during Covid period. LK-MOH-189849-GO-RFQ / 12 Nos Saucepans, 100 Nos Plastic bowl , 30 Ns Shoe Racks, 30 nos Plastic Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Basin, 20Kg Polythene, 3000 IDA / 65950 Post Limited 965.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 Nos Plastic Brooms & 5000 ation Nos Blade procured by Polonnaruwa Hospital during Covid period. LK-MOH-189852-GO-RFQ / 400 Nos Pijama Kits, 500 Nos Surgeon Overall Kits & Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- 500 Nos Surgeon Overall Kit IDA / 65950 Post Limited 10,989.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 - Wraparound procured by ation Polonnaruwa Hospital during Covid period. LK-MOH-189857-GO-RFQ / 750 Check Cloth - Cotton Pending & 750 White Bed Sheet - Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 4,926.00 0.00 Implement Sheeting procured by COVID-19 Response Quotations Envelope 26 07 21 ation Polonnaruwa Hospital during Covid period LK-MOH-189861-GO-RFQ / Hardware Items procured Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- by Polonnaruwa Hospital IDA / 65950 Post Limited 8,826.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 during Covid period from ation Almet Enterprises LK-MOH-189863-GO-RFQ / Hardware items procured Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- by Polonnaruwa Hospital IDA / 65950 Post Limited 731.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 during Covid period from ation Isuru Hardware LK-MOH-189983-GO-RFQ / Paint ans painting Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- consumables procured by IDA / 65950 Post Limited 394.00 0.00 Implement COVID-19 Response Quotations Envelope 29 10 24 Polonnaruwa Hospital ation during Covid period. LK-MOH-189987-GO-RFQ Pending / Steel Hardware items Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 296.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 29 10 24 ation Hospital during Covid period. LK-MOH-189989-GO-RFQ Pending / Silicon gum procured by Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 33.00 0.00 Implement Polonnaruwa Hospital COVID-19 Response Quotations Envelope 29 10 24 ation during Covid period. LK-MOH-189990-GO-RFQ / Hardware items for Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Aluminium partitioning IDA / 65950 Post Limited 2,314.00 0.00 Implement COVID-19 Response Quotations Envelope 29 10 24 work procured by ation Polonnaruwa Hospital during Covid period. LK-MOH-189993-GO-RFQ Pending / Electrical consumables Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 132.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 29 10 24 ation Hospital during Covid period. LK-MOH-189994-GO-RFQ / 01 No Rice Cooker and Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- 100 Nos Multi plug Base IDA / 65950 Post Limited 328.00 0.00 Implement COVID-19 Response Quotations Envelope 29 10 24 procured by Polonnaruwa ation Hospital during Covid period. LK-MOH-189996-GO-RFQ / 01 No. Gas Cooker, 01 No Pending Hot Plate, 02 Nos Television Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 1,830.00 0.00 Implement and 02 Nos Coping Machine COVID-19 Response Quotations Envelope 29 10 24 ation procured by Polonnaruwa Hospital during Covid period. LK-MOH-190000-GO-RFQ Pending / 01 No. Photocopy Machine Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 608.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 29 10 24 ation Hospital during Covid period. LK-MOH-190002-GO-RFQ / 100 Nos Basket, 50 Nos Pending Pillows, 50 Nos Mosquito Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 487.00 0.00 Implement Nets and 250 Mtrs White COVID-19 Response Quotations Envelope 29 10 24 ation Polythene procured by Polonnaruwa Hospital during Covid period. LK-MOH-190114-GO-RFQ Pending / 100 nos Multi Plug Base Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 305.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190115-GO-RFQ / 30Nos Wall Clocks & 30 Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Nos Re-chargeable Torches IDA / 65950 Post Limited 251.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 procured by Polonnaruwa ation Hospital during Covid period. LK-MOH-190116-GO-RFQ Pending / 29 Nos Air Conditioning Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 20,475.00 0.00 Implement Units procured by COVID-19 Response Quotations Envelope 30 11 25 ation Polonnaruwa Hospital during Covid period. LK-MOH-190117-GO-RFQ / 70 Nos Led Bulbs, 25 Nos Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Bulb Holders & 50 Mtrs T T IDA / 65950 Post Limited 98.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 Cables procured by ation Polonnaruwa Hospital during Covid period. LK-MOH-190118-GO-RFQ Pending / 50 Nos 3/4" Conduit Pipe Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 21.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190119-GO-RFQ / 06 Nos Working Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Cupboards & 05 Nos Towel IDA / 65950 Post Limited 1,395.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 Racks (Large) procured by ation Polonnaruwa Hospital during Covid period. LK-MOH-190120-GO-RFQ / 30 Nos MDF/Melamine Tables, 30 Nos Pending MDF/Melamine Altamira, 20 Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 4,889.00 0.00 Implement Nos Book Racks, 20 Shoe COVID-19 Response Quotations Envelope 30 11 25 ation Racks & 3 Nos Mirrors procured by Polonnaruwa Hospital during Covid period. LK-MOH-190121-GO-RFQ / 60 Ltrs Emulsion Paints, Pending 60 Ltrs Weather Guard Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 554.00 0.00 Implement Paints & 100 Nos Sand COVID-19 Response Quotations Envelope 30 11 25 ation Papers procured by Polonnaruwa Hospital during Covid period. LK-MOH-190122-GO-RFQ Pending / 04 Ltrs Floor Paints Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 15.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190123-GO-RFQ / 20 Nos Stand Fans and 30 Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Nos Ceiling Fans procured IDA / 65950 Post Limited 1,842.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 by Polonnaruwa Hospital ation during Covid period. LK-MOH-190126-GO-RFQ / 02 Nos Polythene Sealer, Pending 50 Nos Sink Brush & 25 Nos Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 2,731.00 0.00 Implement Shopping Trolley procured COVID-19 Response Quotations Envelope 30 11 25 ation by Polonnaruwa Hospital during Covid period. LK-MOH-190128-GO-RFQ / 200 Nos Pillow Case, 60 Pending Nos Half Shoes & 04 Nos Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 102.00 0.00 Implement Carrot Beater procured by COVID-19 Response Quotations Envelope 30 11 25 ation Polonnaruwa Hospital during Covid period. Page 9 LK-MOH-190130-GO-RFQ / 50 Nos Racer & 300 Nos Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Toilet Bowl Cleaner IDA / 65950 Post Limited 212.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 procured by Polonnaruwa ation Hospital during Covid period. LK-MOH-190135-GO-RFQ Pending / 200 Nos Plastic Brooms Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 189.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190136-GO-RFQ Pending / 150 Nos Commode Brush Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 103.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190137-GO-RFQ / 40 Nos 18 W Panel Light Pending (Surface) and electrical Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 1,742.00 0.00 Implement Consumables procured by COVID-19 Response Quotations Envelope 30 11 25 ation Polonnaruwa Hospital during Covid period. LK-MOH-190140-GO-RFQ / 100 Nos Multi Plug Base 13Amp, 100 Nos 18 W Pending Blasters, 400 Mtrs 1.044 Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 720.00 0.00 Implement Electric Cables & 200 nos 18 COVID-19 Response Quotations Envelope 30 11 25 ation W Pin Type CFL Bulbs procured by Polonnaruwa Hospital during Covid period. LK-MOH-190145-GO-RFQ / 25 Nos Ceiling Rose, 15 Pending Nos Wall Clocks & 05 Nos Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 199.00 0.00 Implement Multi function AC Remote COVID-19 Response Quotations Envelope 30 11 25 ation procured by Polonnaruwa Hospital during Covid period. LK-MOH-190153-GO-RFQ / 100 Nos One Way Sunk Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Box & 100 Nos Two Way IDA / 65950 Post Limited 65.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 Sunk Boxes procured by ation Polonnaruwa Hospital during Covid period. LK-MOH-190156-GO-RFQ Pending / Steel Hardware items Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 22,014.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190158-GO-RFQ Pending / Electrical Consumables Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 421.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190161-GO-RFQ Pending / Hardware items procured Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 411.00 0.00 Implement by Polonnaruwa Hospital COVID-19 Response Quotations Envelope 30 11 25 ation during Covid period. LK-MOH-190162-GO-RFQ Pending / 10 Nos Desk top Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 6,211.00 0.00 Implement Computers procured by COVID-19 Response Quotations Envelope 30 11 25 ation Polonnaruwa Hospital during Covid period. LK-MOH-190163-GO-RFQ Pending / 20000 Nos Lunch Sheets Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 158.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190165-GO-RFQ / 04 Nos Reception Tables & Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- 12 Nos Bunker Beds with IDA / 65950 Post Limited 8,748.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 Ladders procured by ation Polonnaruwa Hospital during Covid period. LK-MOH-190168-GO-RFQ / 20 Nos Toner for Toshiba Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- E Studio Photocopier IDA / 65950 Post Limited 1,228.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 procured by Polonnaruwa ation Hospital during Covid period. LK-MOH-190172-GO-RFQ / 15 Nos Keyocera TASKalfa Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- 1800 Toner procured by IDA / 65950 Post Limited 1,006.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 Polonnaruwa Hospital ation during Covid period. LK-MOH-190173-GO-RFQ Pending / Electrical Consumables Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 868.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190176-GO-RFQ / 08 Nos 1"Conduit Pipes Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- and 01 No Two Pole IDA / 65950 Post Limited 6.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 Connector Box procured by ation Polonnaruwa Hospital during Covid period. LK-MOH-190177-GO-RFQ Pending / Electrical Consumables Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 121.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 05 17 31 ation Hospital during Covid period. LK-MOH-190178-GO-RFQ Pending / Electrical Consumables Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 498.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190179-GO-RFQ Pending / 10000 Lunch Sheets Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 79.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190180-GO-RFQ Pending / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 284.00 0.00 Implement by Polonnaruwa Hospital COVID-19 Response Quotations Envelope 30 11 25 ation during Covid period. LK-MOH-190183-GO-RFQ Pending / Paints & Painting Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 219.00 0.00 Implement consumables procured by COVID-19 Response Quotations Envelope 30 11 25 ation Polonnaruwa Hospital during Covid period. LK-MOH-190184-GO-RFQ Pending / Electrical consumables Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 1,449.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190185-GO-RFQ Pending / 03 Nos Transport Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 30,711.00 0.00 Implement Ventilators procured by COVID-19 Response Quotations Envelope 30 11 25 ation Polonnaruwa Hospital during Covid period. LK-MOH-190186-GO-RFQ Pending / 20 Nos Digital BP Meters Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 635.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 30 11 25 ation Hospital during Covid period. LK-MOH-190189-GO-RFQ / 10 Nos Calibration Cartridges, 10 Nos Rinsing Solutions MATA, 10 Nos Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Rinsing Solutions BAG ISE IDA / 65950 Post Limited 11,751.00 0.00 Implement COVID-19 Response Quotations Envelope 30 11 25 and Consumables Rinsing ation Solutions procured by Polonnaruwa Hospital during Covid period. LK-MOH-190299-GO-RFQ Pending / 03 Units of ICU Ventilators Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 47,368.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 31 12 26 ation Hospital during Covid period. LK-MOH-190300-GO-RFQ / 01 Unit Bio Safety Cabinet (Double Use), 01 Unit Sealed Pending Bucket Safety Cabinet Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 29,921.00 0.00 Implement Centrifuge and 05 Part COVID-19 Response Quotations Envelope 31 12 26 ation Hematology Analyser procured by Polonnaruwa Hospital during Covid period. LK-MOH-190301-GO-RFQ / 01 Unit Portable Digital X- Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- ray Machine procured by IDA / 65950 Post Limited 52,368.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Polonnaruwa Hospital ation during Covid period. LK-MOH-190302-GO-RFQ Pending / 03 Unit Transport Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 30,711.00 0.00 Implement Ventilator procured by COVID-19 Response Quotations Envelope 31 12 26 ation Polonnaruwa Hospital during Covid period. LK-MOH-190303-GO-RFQ Pending / 02 Units ECG Machines Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 4,305.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 31 12 26 ation Hospital during Covid period. LK-MOH-190304-GO-RFQ Pending / 04 Nos Video Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 12,526.00 0.00 Implement Leryngeoscope procured by COVID-19 Response Quotations Envelope 31 12 26 ation Polonnaruwa Hospital during Covid period. LK-MOH-190306-GO-RFQ Pending / 06 Nos Defibrillators Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 31,136.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 31 12 26 ation Hospital during Covid period. LK-MOH-190307-GO-RFQ / 50 Nos Stethoscope & 100 Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Nos BP Operators procured IDA / 65950 Post Limited 7,066.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 by Polonnaruwa Hospital ation during Covid period. LK-MOH-190308-GO-RFQ Pending / 10 Nos Infrared Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 934.00 0.00 Implement Thermometers procured by COVID-19 Response Quotations Envelope 31 12 26 ation Polonnaruwa Hospital during Covid period. LK-MOH-190310-GO-RFQ / 10 Nos Suction Apparatus Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- - Double Jar procured by IDA / 65950 Post Limited 15,711.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Polonnaruwa Hospital ation during Covid period. LK-MOH-190312-GO-RFQ Pending / 01 No Portable RO Plant Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 2,368.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 31 12 26 ation Hospital during Covid period. LK-MOH-190314-GO-RFQ Pending / 08 Nos Bi PAP procured by Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 49,705.00 0.00 Implement Polonnaruwa Hospital COVID-19 Response Quotations Envelope 31 12 26 ation during Covid period. LK-MOH-190329-GO-RFQ Pending / 05 Nos ICU Beds procured Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 13,118.00 0.00 Implement by Polonnaruwa Hospital COVID-19 Response Quotations Envelope 31 12 26 ation during Covid period. LK-MOH-190332-GO-RFQ / Supply & Installation of 1 Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Unit AC And Ventilation IDA / 65950 Post Limited 39,960.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 System procured by ation Polonnaruwa Hospital during Covid period. LK-MOH-190339-GO-RFQ Pending / 01 No Centrifuge procured Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 5,263.00 0.00 Implement by Ragama Teaching COVID-19 Response Quotations Envelope 31 12 26 ation Hospital during Covid period. LK-MOH-190340-GO-RFQ / 03 Nos Screen Laryngeal Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- set for five blades procured IDA / 65950 Post Limited 3,553.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 by Ragama Teaching ation Hospital during Covid period. LK-MOH-190341-GO-RFQ Pending / 01 no H2O2 Vapor Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-10- IDA / 65950 Post Direct Selection Direct 4,711.00 0.00 Implement system procured by Ragama COVID-19 Response 26 31 21 05 ation Teaching Hospital during Covid period LK-MOH-190342-GO-RFQ / 01 No Point of care testing Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- (POCT) Immunol Analyzer IDA / 65950 Post Limited 2,895.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-190345-GO-RFQ Pending / 01 No Server Rack for Lab Component 1: Emergency 2020-08- 2020-08- 2020-10- 2021-04- IDA / 65950 Post Direct Selection Direct 522.00 0.00 Implement procured by Ragama COVID-19 Response 26 31 05 03 ation Teaching Hospital during Covid period. LK-MOH-190346-GO-RFQ Pending / 01 No Electric Door Lock Component 1: Emergency 2020-08- 2020-08- 2020-10- 2021-04- IDA / 65950 Post Direct Selection Direct 575.00 0.00 Implement procured by Ragama COVID-19 Response 26 31 05 03 ation Teaching Hospital during Covid period. LK-MOH-190348-GO-RFQ / Furniture for Patient Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Waiting Area procured by IDA / 65950 Post Limited 1,032.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Ragama Teaching Hospital ation during Covid period. LK-MOH-190350-GO-RFQ / Furniture for Patient Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Waiting Area procured by IDA / 65950 Post Limited 462.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Ragama Teaching Hospital ation during Covid period. LK-MOH-190352-GO-RFQ / Furniture for Patient Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- waiting area procured by IDA / 65950 Post Limited 807.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Ragama Teaching Hospital ation during Covid period. LK-MOH-190355-GO-DIR Pending / 04 Nos Ambulance Tyre Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-10- IDA / 65950 Post Direct Selection Direct 509.00 0.00 Implement procured by Ragama COVID-19 Response 26 31 21 05 ation Teaching Hospital during Covid period. LK-MOH-190357-GO-RFQ Pending / 50 nos Mattresses Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 1,039.00 0.00 Implement procured by Ragama COVID-19 Response Quotations Envelope 31 12 26 ation Teaching Hospital during Covid period. LK-MOH-190358-GO-RFQ Pending / 01 Unit Centrifuge Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 5,201.00 0.00 Implement procured by Ragama COVID-19 Response Quotations Envelope 31 12 26 ation Teaching Hospital during Covid period. LK-MOH-190360-GO-DIR / 5000 Nos A4 Size Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-10- Transparent Sheets IDA / 65950 Post Direct Selection Direct 237.00 0.00 Implement COVID-19 Response 26 31 21 05 procured by Ragama ation Teaching Hospital during Covid period. LK-MOH-190413-GO-RFQ Pending / Bathroom Fittings Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2021-04- IDA / 65950 Post Limited 264.00 0.00 Implement procured by Rathnapura COVID-19 Response Quotations Envelope 31 05 03 ation General Hospital during Covid period. LK-MOH-190422-GO-DIR / Electrical Consumables Pending Component 1: Emergency 2020-08- 2020-08- 2020-10- 2021-04- procured by Rathnapura IDA / 65950 Post Direct Selection Direct 247.00 0.00 Implement COVID-19 Response 26 31 05 03 General Hospital during ation Covid period. LK-MOH-190424-GO-RFQ / Polythene, Gum Tape and Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- Formica stick Glue procured IDA / 65950 Post Limited 346.00 0.00 Implement COVID-19 Response Quotations Envelope 31 05 12 by Rathnapura General ation Hospital during Covid period. LK-MOH-190432-GO-RFQ / Instruments & Consumables to commence Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- COVID-19 RT-PCR Test IDA / 65950 Post Limited 1,462.00 0.00 Implement COVID-19 Response Quotations Envelope 31 05 12 procured by Rathnapura ation General Hospital during Covid period. (Advance) LK-MOH-190437-GO-RFQ / Instruments & Consumables to commence Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- COVID-19 RT-PCR Test IDA / 65950 Post Limited 1,277.00 0.00 Implement COVID-19 Response Quotations Envelope 31 05 12 procured by Rathnapura ation General Hospital during Covid period. (Retroactive) LK-MOH-190441-GO-RFQ / Consumables to Pending commence COVID-19 RT- Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 233.00 0.00 Implement PCR Test procured by COVID-19 Response Quotations Envelope 31 05 12 ation Rathnapura General Hospital during Covid period. Page 10 LK-MOH-190442-GO-RFQ / Consumables & Pending instruments related to nCoV Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 65950 Post Limited 1,269.00 0.00 Implement RT-PCR test procured by COVID-19 Response Quotations Envelope 31 05 12 ation Rathnapura General Hospital during Covid period. LK-MOH-190445-GO-RFQ / PCR Tubes for 7500 Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- FASTO PCR Machine IDA / 65950 Post Limited 3,204.00 0.00 Implement COVID-19 Response Quotations Envelope 31 05 12 procured by Rathnapura ation General Hospital during Covid period. LK-MOH-190631-GO-RFQ / 90 Nos Dust Bin 50 Ltr & Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 24 Nos Dust Bin 120 Ltr IDA / 65950 Post Limited 1,554.00 0.00 Implement COVID-19 Response Quotations Envelope 01 29 13 procured by Supply Division ation G during Covid period (Advance) LK-MOH-190632-GO-RFQ / 50 Nos Mattresses Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 72"x30"x4" & 30 Nos Water IDA / 65950 Post Limited 4,099.00 0.00 Implement COVID-19 Response Quotations Envelope 01 29 13 Dispensers procured by ation Supply Division G during Covid period LK-MOH-190633-GO-RFQ / 1000 Yard Polythene for Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- Aprons procured by IDA / 65950 Post Limited 421.00 0.00 Implement COVID-19 Response Quotations Envelope 01 29 13 Kaluthara DGH G During ation Covid period (Advance) LK-MOH-190634-GO-RFQ / 10000 Nos Soap for Hand Washing , 10000 Nos Soap Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- for Cloth washing & 1000 IDA / 65950 Post Limited 5,144.00 0.00 Implement COVID-19 Response Quotations Envelope 01 29 13 Kg Washing Powder ation procured by Kaluthara DGHG during Covid period (advance) LK-MOH-190635-GO-RFQ Pending / 210 Nos Surgeon Gowns Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- IDA / 65950 Post Limited 1,382.00 0.00 Implement procured by Kaluthara COVID-19 Response Quotations Envelope 01 29 13 ation DGHG during Covid period LK-MOH-190636-GO-RFQ Pending / 05 Nos normal Beds Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- IDA / 65950 Post Limited 554.00 0.00 Implement procured by Kaluthara COVID-19 Response Quotations Envelope 01 29 13 ation DGHG during Covid period LK-MOH-190638-GO-RFQ / 05 Nos Mattresses & 05 Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- Nos Plastic Chairs procured IDA / 65950 Post Limited 737.00 0.00 Implement COVID-19 Response Quotations Envelope 01 29 13 by Kaluthara DGHG during ation Covid period LK-MOH-190639-GO-RFQ / 01 Nos 12000 BTU AC Machine, 03 Nos 18000 BTU Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- AC Machines & 04 Nos IDA / 65950 Post Limited 5,468.00 0.00 Implement COVID-19 Response Quotations Envelope 01 29 13 24000 BTU AC Machines ation procured by Chilaw DGHG during Covid period LK-MOH-190642-GO-RFQ Pending / 01 No Centrifuge procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 5,263.00 0.00 Implement by Ragama Teaching COVID-19 Response Quotations Envelope 01 13 27 ation Hospital G during Covid period. LK-MOH-190644-GO-RFB / 01 Unit Point of Care Pending Testing BIOCHEMISTRY Component 1: Emergency Single Stage - One 2020-08- 2020-09- 2020-10- 2020-11- 2020-12- 2021-06- IDA / 65950 Post Request for Bids Open - National 6,579.00 0.00 Implement ANALYZER procured by COVID-19 Response Envelope 27 01 13 12 17 15 ation Ragama Teaching Hospital G during Covid period. LK-MOH-190647-GO-RFB / 01 Unit Bio Safety Cabinet Pending Component 1: Emergency Single Stage - One 2020-08- 2020-09- 2020-10- 2020-11- 2020-12- 2021-06- procured by Ragama IDA / 65950 Post Request for Bids Open - National 9,379.00 0.00 Implement COVID-19 Response Envelope 27 01 13 12 17 15 Teaching Hospital G during ation Covid period.(Advance) LK-MOH-190648-GO-RFQ / 07 Nos PCR reagent and Pending Consumables (Qlamp viral Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 9,470.00 0.00 Implement RNA Mini kit) procured by COVID-19 Response Quotations Envelope 01 06 13 ation Ragama Teaching Hospital during Covid period.(Advance) LK-MOH-190650-GO-RFQ / 06 Nos PCR reagent and Consumables (Artus e NAT Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- collection kit 300) procured IDA / 65950 Post Limited 5,968.00 0.00 Implement COVID-19 Response Quotations Envelope 01 06 13 by Ragama Teaching ation Hospital G during Covid period (Advance) LK-MOH-190652-GO-RFQ / 100 Nos Face Shields, 100 Nos Long Sleeved impervious Gown, 200 Nos Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Face Shields & 200 Nos IDA / 65950 Post Limited 2,842.00 0.00 Implement COVID-19 Response Quotations Envelope 01 06 13 Long Sleeved impervious ation Gown procured by Ragama Teaching Hospital G during Covid period. (Advance) LK-MOH-190653-GO-RFQ / Hardware item for Repair Beds of Koran-tine center Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- plywood sheet,wring nails IDA / 65950 Post Limited 815.00 0.00 Implement COVID-19 Response Quotations Envelope 01 06 13 Hand saw etc procured by ation Ragama Teaching Hospital G during Covid period.(Advance) LK-MOH-190654-GO-RFQ Pending / 200 Nos N 95 Masks Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 344.00 0.00 Implement procured by Karapitiya TGH COVID-19 Response Quotations Envelope 01 06 13 ation G during Covid period. LK-MOH-190655-GO-RFQ / 50 Nos Spin Star Viral Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- nucleic Acid Extraction kit IDA / 65950 Post Limited 21,316.00 0.00 Implement COVID-19 Response Quotations Envelope 01 06 13 Karapitiya Teaching Hospital ation G during Covid period. (Advance) LK-MOH-190656-GO-RFQ / 1000 Nos Naso Pending pharyngeal Swab Nobs Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 2,368.00 0.00 Implement procured by Karapitiya COVID-19 Response Quotations Envelope 01 06 13 ation Teaching Hospital G during Covid period. (Advance) LK-MOH-190657-GO-RFQ / 01 No Point of Care Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Testing Devise procured by IDA / 65950 Post Limited 6,579.00 0.00 Implement COVID-19 Response Quotations Envelope 01 06 13 Karapitiya Teaching Hospital ation G during Covid period. LK-MOH-190658-GO-RFQ / Hardware items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 14.00 14.04 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. (Advance) LK-MOH-190678-GO-DIR / Hardware Items procured Under Component 1: Emergency 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- by Polonnaruwa General IDA / 65950 Post Direct Selection Direct 30.00 0.00 Implement COVID-19 Response 27 01 01 01 22 06 Hospital G during Covid ation period. (Advance) LK-MOH-190679-GO-RFQ Pending / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 342.00 0.00 Implement by Polonnaruwa Hospital G COVID-19 Response Quotations Envelope 01 13 27 ation during Covid period. LK-MOH-190681-GO-RFQ / Electrical Consumables Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- procured by Polonnaruwa IDA / 65950 Post Limited 4,970.00 5,120.78 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 Hospital G during Covid period. (Advance) LK-MOH-190692-GO-RFQ / Electrical Consumables Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- procured by Polonnaruwa IDA / 65950 Post Limited 1,111.00 1,140.73 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 Hospital G during Covid period. LK-MOH-190696-GO-RFQ / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- IDA / 65950 Post Limited 195.00 201.22 Signed by Polonnaruwa Hospital G COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. LK-MOH-190700-GO-RFQ / 150 Nos 20 W CFL Bulbs Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- procured by Polonnaruwa IDA / 65950 Post Limited 355.00 366.05 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 Hospital G during Covid period. LK-MOH-190705-GO-RFQ / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- IDA / 65950 Post Limited 451.00 464.32 Signed by Polonnaruwa Hospital G COVID-19 Response Quotations Envelope 01 01 13 11 27 during Covid period.(Advance) LK-MOH-190707-GO-RFQ / 115 Nos Roofing Sheets Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- procured by Polonnaruwa IDA / 65950 Post Limited 266.00 0.00 Implement COVID-19 Response Quotations Envelope 01 13 27 Hospital G during Covid ation period. (Advance) LK-MOH-190708-GO-RFQ / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- IDA / 65950 Post Limited 1,148.00 1,178.95 Signed by Polonnaruwa Hospital G COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. LK-MOH-190710-GO-RFQ / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- IDA / 65950 Post Limited 8.00 7.92 Signed by Polonnaruwa Hospital G COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. LK-MOH-190714-GO-RFQ / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- IDA / 65950 Post Limited 30.00 31.14 Signed by Polonnaruwa Hospital G COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. LK-MOH-190720-GO-RFQ / Hardware items procured Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 411.00 0.00 Implement COVID-19 Response Quotations Envelope 01 13 27 during Covid period. ation (Advance) LK-MOH-190744-GO-RFQ / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 125.00 30.82 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. (Advance) LK-MOH-190746-GO-RFQ / Hardware Items procured Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 383.00 0.00 Implement COVID-19 Response Quotations Envelope 01 13 27 during Covid period. ation (Advance) LK-MOH-190747-GO-RFQ / Electrical Consumables Under Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-10- procured by Polonnaruwa IDA / 65950 Post Limited 27.00 28.01 Implement COVID-19 Response Quotations Envelope 01 01 13 27 Hospital G during Covid ation period. (Advance) LK-MOH-190749-GO-RFQ / 02 Nos Haylese Power Sprayers procured by Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- IDA / 65950 Post Limited 197.00 202.16 Signed Polonnaruwa Hospital G COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. (Advance) LK-MOH-190750-GO-RFQ / 04 Nos 1"x1" Box Bars & 04 Nos 1x1/2 Reducing Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- IDA / 65950 Post Limited 34.00 34.72 Signed Tee procured by COVID-19 Response Quotations Envelope 01 01 13 10 27 Polonnaruwa Hospital G during Covid period. (Advance) LK-MOH-190752-GO-RFQ / 01 No Septic Tank with Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Transport procured by IDA / 65950 Post Limited 203.00 0.00 Implement COVID-19 Response Quotations Envelope 01 13 27 Polonnaruwa Hospital G ation during Covid period. LK-MOH-190753-GO-RFQ / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 580.00 594.07 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. (Advance) LK-MOH-190755-GO-RFQ / Household Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 2,414.00 2,951.50 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. (Advance) LK-MOH-190758-GO-RFQ Pending / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 588.00 0.00 Implement by Polonnaruwa Hospital G COVID-19 Response Quotations Envelope 01 13 27 ation during Covid period. LK-MOH-190765-GO-RFQ / Household Items procured Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 2,362.00 0.00 Implement COVID-19 Response Quotations Envelope 01 13 27 during Covid period. ation (Advance) LK-MOH-190770-GO-RFQ / Stationery Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 51.00 52.23 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. (Advance) LK-MOH-190775-GO-RFQ / 08 Items of Doctor Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- Overalls, Pijamas & Towels IDA / 65950 Post Limited 9,416.00 9,672.89 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 procured by Polonnaruwa Hospital G during Covid period. LK-MOH-190776-GO-RFQ / 01 No. Coffin procured by Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Polonnaruwa Hospital G IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 01 13 27 during Covid period. ation (Advance) LK-MOH-190778-GO-RFQ / Hardware Items procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- by Polonnaruwa Hospital G IDA / 65950 Post Limited 7,540.00 7,743.68 Signed COVID-19 Response Quotations Envelope 01 01 13 10 27 during Covid period. (Advance) LK-MOH-190781-GO-RFQ / Household and Pending Miscellaneous items Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 476.00 0.00 Implement procured by Polonnaruwa COVID-19 Response Quotations Envelope 01 13 27 ation Hospital G during Covid period. (Advance) LK-MOH-190930-GO-RFQ / 02 Nos Washing Machines, Pending 01 No. Jukkie Machine & 01 Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 1,395.00 0.00 Implement No Refrigerator procured by COVID-19 Response Quotations Envelope 02 14 28 ation Anuradhapura TH during Covid period. LK-MOH-190931-GO-RFQ / 10 Nos Cupboards & 02 Pending Nos Mirror Cupboards Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 1,516.00 0.00 Implement procured by Anuradhapura COVID-19 Response Quotations Envelope 02 14 28 ation Teaching Hospital G during Covid period. LK-MOH-190932-GO-RFQ / 12 Nos Water Bottles & 20 Pending Nos Plastic Containers 70 Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 702.00 0.00 Implement Ltrs procured by COVID-19 Response Quotations Envelope 02 14 28 ation Anuradhapura Teaching Hospital G during Covid period. LK-MOH-190933-GO-RFQ / 16 Nos Hand Sprayers (16 Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- L) procured by IDA / 65950 Post Limited 26.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Anuradhapura Teaching ation Hospital G during Covid period. LK-MOH-190934-GO-RFQ / 01 No Plate Cutting Scissors, 150 Nos Gum Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Boots & 25 Nos Mattresses IDA / 65950 Post Limited 2,053.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 6'x3' procured by ation Anuradhapura Teaching Hospital G during Covid period. LK-MOH-190935-GO-RFQ / Household Items procured Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- by Anuradhapura Teaching IDA / 65950 Post Limited 1,491.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Hospital G during Covid ation period. Page 11 LK-MOH-190937-GO-RFQ / 65 Nos Dust Bins with Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- paddle procured by IDA / 65950 Post Limited 428.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Anuradhapura Teaching ation Hospital G during Covid period. LK-MOH-190938-GO-RFQ / 01 No Gas Stoves Single Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- procured by Anuradhapura IDA / 65950 Post Limited 39.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Teaching Hospital G during ation Covid period. LK-MOH-190939-GO-RFQ / 15 Nos Plastic Chairs Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- procured by Anuradhapura IDA / 65950 Post Limited 87.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Teaching Hospital G during ation Covid period. LK-MOH-190940-GO-RFQ / 03 Nos Electric Heater Pending Jugs & 16 Nos Hot Water Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 87.00 0.00 Implement Flasks procured by COVID-19 Response Quotations Envelope 02 14 28 ation Anuradhapura Teaching Hospital G during Covid period. LK-MOH-190941-GO-RFQ / 10 Nos Beds (Wooden) Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- 6'x3' procured by IDA / 65950 Post Limited 711.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Anuradhapura Teaching ation Hospital G during Covid period. LK-MOH-190942-GO-RFQ / 5000 Nos Soap for washing Hands, 1000 Nos Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Hand Wash & 5000 Pkts IDA / 65950 Post Limited 5,053.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Paper Serviette procured by ation Anuradhapura Teaching Hospital G during Covid period. LK-MOH-190943-GO-RFQ / 250 Kg Polythene Roll 6" & Pending 250 Kg Polythene Roll 8" Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- IDA / 65950 Post Limited 1,221.00 0.00 Implement procured by Anuradhapura COVID-19 Response Quotations Envelope 02 14 28 ation Teaching Hospital G during Covid period. LK-MOH-190944-GO-RFQ / 400 Mtrs Poplin Cloth, 500 Nos Baby Pampas & 25 Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Nos Mob Buckets procured IDA / 65950 Post Limited 1,072.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 by Anuradhapura Teaching ation Hospital G during Covid period. LK-MOH-190946-GO-RFQ / 160 Mtrs Polythene Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- procured by Anuradhapura IDA / 65950 Post Limited 17.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Teaching Hospital G during ation Covid period. LK-MOH-190947-GO-RFQ / 100 Nos Regiform Bottles, 5100 Lunch Sheets & 25 Kg Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Wrapping Papers procured IDA / 65950 Post Limited 146.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 by Anuradhapura Teaching ation Hospital G during Covid period. LK-MOH-190948-GO-RFQ / 20 Nos 1"Cello Tape Roll, 500 Nos Yellow Garbage Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Bags (Large) & 200 Mtrs IDA / 65950 Post Limited 87.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Wire procured by ation Anuradhapura Teaching Hospital G during Covid period. LK-MOH-190950-GO-RFQ / 180 Mtrs MACINTOSH Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- (BLACK) procured by IDA / 65950 Post Limited 100.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Anuradhapura Teaching ation Hospital G during Covid period. LK-MOH-190951-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- / 100 Mtrs Poplin Cloth & IDA / 65950 Post Limited 921.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 500 Ns Baby Pampas ation LK-MOH-190952-GO-RFQ / 01 No Fan & 01 No Earth Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Rod procured by IDA / 65950 Post Limited 17.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Anuradhapura Teaching ation Hospital G during Covid period. LK-MOH-190953-GO-RFQ / Electrical Consumables Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- procured by Anuradhapura IDA / 65950 Post Limited 64.00 0.00 Implement COVID-19 Response Quotations Envelope 02 14 28 Teaching Hospital G during ation Covid period. LK-MOH-190954-GO-RFQ / 02 Units ICU Ventilator For Adult and peadiactric Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- IDA / 65950 Post Limited 47,526.00 55,387.45 Signed machine procured by COVID-19 Response Quotations Envelope 02 01 14 14 28 Anuradhapura Teaching Hospital G during Covid period. LK-MOH-190958-GO-RFQ / Leflunomide tab.20 mg Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2021-04- IDA / 65950 Post Limited 69,236.00 71,011.32 Signed procured by MSD during COVID-19 Response Quotations Envelope 02 06 28 08 26 Covid period (Advance) LK-MOH-190962-GO-RFQ Pending / Morphine Sulfate CR tab Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 69,236.00 0.00 Implement 10mg procured by by MSD COVID-19 Response Quotations Envelope 02 28 26 ation during Covid period. (Advance) LK-MOH-190963-GO-RFQ Pending / Sodium bicarbonate for IV Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 119,368.00 0.00 Implement use 8.4% ,50 ml procured by COVID-19 Response Quotations Envelope 02 28 26 ation by MSD during Covid period LK-MOH-190965-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- / Clotrimazole IDA / 65950 Post Limited 3,563.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 1%+Lignocaine 2%Ear drops ation 10ml vial LK-MOH-190968-GO-RFQ Pending / Beta methasone Lotion Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 36,947.00 0.00 Implement 0.05%, 50ml bot procured COVID-19 Response Quotations Envelope 02 28 26 ation by by MSD during Covid period LK-MOH-190971-GO-RFQ Pending / Doxycycline hydrochloride Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 52,895.00 0.00 Implement Cap. 100mg procured by by COVID-19 Response Quotations Envelope 02 28 26 ation MSD during Covid period LK-MOH-190973-GO-RFQ / Doxycycline hydrochloride Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- Cap. 100 mg procured by by IDA / 65950 Post Limited 55,263.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 MSD during Covid period ation (Advance) LK-MOH-190974-GO-RFQ / Ipratropium Br. Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- Resp.sol0.25mg/1ml,15ml IDA / 65950 Post Limited 47,869.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 procured by by MSD during ation Covid period. (Advance) LK-MOH-190975-GO-RFQ / Dobutamine Inj. Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2021-04- IDA / 65950 Post Limited 84,884.00 87,048.94 Signed 250mg/20ml procured by COVID-19 Response Quotations Envelope 02 01 28 09 26 by MSD during Covid period. (Advance) LK-MOH-190976-GO-RFQ Pending / Duloxetine (hydrochloride) Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 3,769.00 0.00 Implement 20 mg Capsules procured COVID-19 Response Quotations Envelope 02 28 26 ation by by MSD during Covid period LK-MOH-190977-GO-RFQ Pending / Iron Drops 50mg/ml, in Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 29,800.00 0.00 Implement 15ml dropper procured by COVID-19 Response Quotations Envelope 02 28 26 ation by MSD during Covid period (Advance) LK-MOH-190980-GO-RFQ Pending / Amiodarone injection Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 44,737.00 0.00 Implement 150mg/3ml procured by by COVID-19 Response Quotations Envelope 02 28 26 ation MSD during Covid period LK-MOH-190982-GO-RFQ Pending / Adenosine inj. 6 mg/2 ml Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 125,678.00 0.00 Implement procured by by MSD during COVID-19 Response Quotations Envelope 02 28 26 ation Covid period. (Advance) LK-MOH-190984-GO-RFQ / Ketamine HCl Inj. 500 mg/ Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- 10ml procured by by MSD IDA / 65950 Post Limited 10,516.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 during Covid period. ation (Advance) LK-MOH-190987-GO-RFQ / Clomipramine HCI tab Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- 25mg Vial procured by by IDA / 65950 Post Limited 14,093.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 MSD during Covid period. ation (Advance) LK-MOH-190991-GO-RFQ Pending / Methyl predinisolone IV inj Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 47,629.00 0.00 Implement 1g Vial procured by by MSD COVID-19 Response Quotations Envelope 02 28 26 ation during Covid period LK-MOH-190993-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- / 0.2% Chlorohexidine IDA / 65950 Post Limited 26,526.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 Mouth Wash 100 ml bottle ation LK-MOH-190994-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- / Pethidine hydrochloride IDA / 65950 Post Limited 41,874.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 Inj. 50 mg ation LK-MOH-190995-GO-RFQ Pending / Clobazam tablet 5mg Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 8,736.00 0.00 Implement procured by by MSD during COVID-19 Response Quotations Envelope 02 28 26 ation Covid period LK-MOH-190999-GO-RFQ Pending / Prednisolone Tablet 20mg Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 18,724.00 0.00 Implement procured by by MSD during COVID-19 Response Quotations Envelope 02 28 26 ation Covid period LK-MOH-191001-GO-RFQ Pending / Levofloxacin Tab. 500mg Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 4,013.00 0.00 Implement procured by by MSD during COVID-19 Response Quotations Envelope 02 28 26 ation Covid period LK-MOH-191002-GO-RFQ Pending / Fluconazole Cap. 50mg Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 2,021.00 0.00 Implement procured by by MSD during COVID-19 Response Quotations Envelope 02 28 26 ation Covid period LK-MOH-191005-GO-RFQ Pending / Oseltami vir cap.45mg Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 67,308.00 0.00 Implement procured by by MSD during COVID-19 Response Quotations Envelope 02 28 26 ation Covid period LK-MOH-191006-GO-RFQ Pending / Moxifloxacin ophthalmic Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 9,955.00 0.00 Implement solutn. 0.5%,5ml procured COVID-19 Response Quotations Envelope 02 28 26 ation by by MSD during Covid period LK-MOH-191008-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- / Di clofenac sodium supp. IDA / 65950 Post Limited 3,752.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 25 mg ation LK-MOH-191010-GO-RFQ Pending / Suxamethonium chloride Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 40,895.00 0.00 Implement inj.100mg/2ml procured by COVID-19 Response Quotations Envelope 02 28 26 ation by MSD during Covid period LK-MOH-191013-GO-RFQ Pending / Clotrimazole pessaries Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 3,754.00 0.00 Implement 100 mg procured by by COVID-19 Response Quotations Envelope 02 28 26 ation MSD during Covid period LK-MOH-191014-GO-RFQ Pending / Pancuronium bromide inj. Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 75,000.00 0.00 Implement 4mg/2ml procured by by COVID-19 Response Quotations Envelope 02 28 26 ation MSD during Covid period LK-MOH-191015-GO-RFQ Pending / Prednisolone Syr.5mg / Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 8,499.00 0.00 Implement 5ml ,60ml procured by by COVID-19 Response Quotations Envelope 02 28 26 ation MSD during Covid period LK-MOH-191016-GO-RFQ / Fluticasone + Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2021-04- Salmeterolinha 50mcg IDA / 65950 Post Limited 1,292.00 17,778.14 Signed COVID-19 Response Quotations Envelope 02 01 28 10 26 /25mcg md,120d procured by by MSD during Covid period LK-MOH-191018-GO-RFQ / Total Pareneteral Nutrition Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- in 1000ml -2500ml IDA / 65950 Post Limited 66,274.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 26 collapsible bag procured by ation by MSD during Covid period LK-MOH-191019-GO-RFQ Pending / Spacer device for infants Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 5,921.00 0.00 Implement procured by by MSD during COVID-19 Response Quotations Envelope 02 28 26 ation Covid period LK-MOH-191020-GO-RFQ Pending / Potassium cit-rate Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / 65950 Post Limited 6,908.00 0.00 Implement procured by by MSD during COVID-19 Response Quotations Envelope 02 28 26 ation Covid period LK-MOH-191022-GO-RFQ / Protein hydrolysate Inj. Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2021-04- IDA / 65950 Post Limited 1,695.00 1,738.19 Signed 100ml procured by by MSD COVID-19 Response Quotations Envelope 02 01 28 10 26 during Covid period LK-MOH-191665-GO-RFQ / 01 Unit Refrigerator (450 Component 1: Emergency Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-11- IDA / 65950 Post Limited 2,631.00 870.27 Signed -500 Ltr Capacity) for COVID-19 Response Quotations Envelope 08 02 27 28 10 Airport Health Office Katunayake LK-MOH-191666-GO-RFQ / 12 Nos Laptops, 05 Nos Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020-12- Desk Tops, 01 No IDA / 65950 Post Limited 15,789.00 0.00 Implement COVID-19 Response Quotations Envelope 15 10 01 Photocopier and 01 No ation Facsimile Machine for Project Monitoring Unit LK-MOH-191667-GO-RFQ / Installation of Air Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-10- Condition unit at MICU by IDA / 65950 Post Limited 29.00 0.00 Implement COVID-19 Response Quotations Envelope 08 13 27 Ragama Teaching Hospital ation during Covid period. LK-MOH-192417-GO-RFQ / 02 Nos Desktop Computers, 02 Nos Laptop Computers, 01 No. Laser Pending Colour Printer, 01 No. Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020-12- TF / B3017 Post Limited 7,053.00 0.00 Implement Multimedia Projector, 01 No COVID-19 Response Quotations Envelope 29 17 08 ation Photocopy Machine, 01 No: Facsimile Machine, 01 No: Web Cam with Head set and 01 No: Android Box require for FHB under Covid Grant LK-MOH-192425-GO-RFQ / 01 No. Executive Table, 03 Nos High Back Executive Chairs, 02 Nos Tables, 11 Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020-12- nos Law Back Chairs, 01 No TF / B3017 Post Limited 4,112.00 0.00 Implement COVID-19 Response Quotations Envelope 29 17 08 Sofa Set, 01 No Folder Rack, ation 05 Nos Office Cupboards and 02 Nos Filing Cabinets required for FHB under Covid Grant LK-MOH-192655-GO-RFQ / 03 Nos Air Condition Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020-12- Plants for refurbishment of TF / B3017 Post Limited 2,368.00 0.00 Implement COVID-19 Response Quotations Envelope 29 17 08 Family Health Bureau under ation Covid Grant LK-MOH-192656-GO-RFQ Pending / 02 Nos UHD TV 42" Component 1: Emergency Request for Single Stage - One 2020-09- 2020-11- 2020-12- TF / B3017 Post Limited 1,263.00 0.00 Implement required for Family Health COVID-19 Response Quotations Envelope 29 17 08 ation Bureau under Covid Grant LK-MOH-193053-GO-DIR Pending / 07 Nos hand Sprayer Component 1: Emergency 2020-09- 2020-09- 2020-09- 2021-03- IDA / 65950 Post Direct Selection Direct 79.00 0.00 Implement procured by District COVID-19 Response 10 15 29 28 ation Hospital Baticalao during Covid Period (Advance) LK-MOH-193055-GO-DIR / 05 Nos Garbage Bins Pending Component 1: Emergency 2020-09- 2020-09- 2020-09- 2020-09- procured by Baticaloa IDA / 65950 Post Direct Selection Direct 132.00 0.00 Implement COVID-19 Response 10 15 29 30 District Hospital during ation Covid period. (Advance) LK-MOH-193058-GO-DIR / 41 Nos Hand Wash Pending Component 1: Emergency 2020-09- 2020-09- 2020-09- 2020-10- Dispensers procured by IDA / 65950 Post Direct Selection Direct 270.00 0.00 Implement COVID-19 Response 10 15 29 13 Baticaloa District Hospital ation during Covid period. (Advance) Page 12 LK-MOH-193051-GO-RFQ / PCR testing and Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-11- consumables procured by IDA / 65950 Post Limited 768.00 0.00 Implement COVID-19 Response Quotations Envelope 15 27 10 Baticaloa District Hospital ation during Covid period. (advance) LK-MOH-193052-GO-RFQ Pending / 08 Nos Desk top Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-11- IDA / 65950 Post Limited 4,842.00 0.00 Implement Computers procured by COVID-19 Response Quotations Envelope 15 27 10 ation Baticaloa District Hospital during Covid period. LK-MOH-193062-GO-RFQ / 02 Nos Air Conditioner 36000 BTU & 02 Nos Air Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-11- Conditioner 24000 BTU IDA / 65950 Post Limited 4,524.00 0.00 Implement COVID-19 Response Quotations Envelope 15 27 10 procured by Baticaloa ation District Hospital during Covid period. (Advance) LK-MOH-193065-GO-RFQ / 300 nos. Nilkamal Plastic Pending Chairs with Arm procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-11- IDA / 65950 Post Limited 1,658.00 0.00 Implement by Baticaloa District Hospital COVID-19 Response Quotations Envelope 15 27 10 ation during Covid period. (Advance) LK-MOH-193071-GO-RFQ / 10 Nos Half Shoes Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-11- procured by Baticaloa IDA / 65950 Post Limited 64.00 0.00 Implement COVID-19 Response Quotations Envelope 15 27 10 District Hospital during ation Covid period. (Advance) LK-MOH-193076-GO-RFQ Pending / 35 Nos Nescafe procured Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-11- IDA / 65950 Post Limited 159.00 0.00 Implement by Baticaloa District Hospital COVID-19 Response Quotations Envelope 15 27 10 ation during Covid period.(Advance) LK-MOH-193078-GO-RFQ / 33 Nos Drinking Water Pending Component 1: Emergency Request for Single Stage - One 2020-09- 2020-10- 2020-11- Bottles-19Ltr procured by IDA / 65950 Post Limited 63.00 0.00 Implement COVID-19 Response Quotations Envelope 15 27 10 Baticaloa District Hospital ation during Covid period. (Advance) LK-MOH-193801-GO-DIR / Novel Coronavirus (Covid- Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- 19) Real Time PCR kit (100 IDA / 65950 Post Direct Selection Direct 384,211.00 0.00 Implement COVID-19 Response 15 20 11 25 Reactions per kit) for ation 40,000 reactions LK-MOH-193802-GO-DIR Pending / QIAmp Viral RNA Mini Kit Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- IDA / 65950 Post Direct Selection Direct 147,368.00 0.00 Implement extraction kit (100 COVID-19 Response 15 20 11 25 ation Reactions per kit) for 40,000 reactions LK-MOH-193803-GO-DIR Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- / 48,000 Nos Viral transport IDA / 65950 Post Direct Selection Direct 25,305.00 0.00 Implement COVID-19 Response 15 21 12 26 media with swabs ation LK-MOH-193804-GO-DIR / 80,000 Nos Micro Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- centrifuge tubes, Virgin IDA / 65950 Post Direct Selection Direct 1,835.00 0.00 Implement COVID-19 Response 15 20 11 25 polypropylene, safe lock, ation PCR grade, sterile, colourless, Vol. 1.5ml LK-MOH-193805-GO-DIR / 80 Nos Cryo vial, vial Pending stands without holder, Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- IDA / 65950 Post Direct Selection Direct 9,175.00 0.00 Implement screw capped, autoclavable, COVID-19 Response 15 20 11 25 ation can be frozen at -80 C, bulk packed, volume 1.8ml LK-MOH-193808-GO-DIR / 44 Packs of Micro Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- centrifuge tubes: 0.2 ml PCR IDA / 65950 Post Direct Selection Direct 2,083.00 0.00 Implement COVID-19 Response 15 20 11 25 grade, clear tubes in strips ation (8 tubes) 120 strips per pack LK-MOH-193809-GO-DIR / 8,000 Nos Micro Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- centrifuge tubes: 0.1 ml PCR IDA / 65950 Post Direct Selection Direct 1,474.00 0.00 Implement COVID-19 Response 15 20 11 25 grade, clear tubes in strips ation (4 tubes) with cap LK-MOH-193810-GO-DIR / 24,000 Nos Micro Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- centrifuge tubes for IDA / 65950 Post Direct Selection Direct 998.00 0.00 Implement COVID-19 Response 15 20 11 25 amplification; Flat-shaped ation lids, size 0.2 ml (PCR grade) LK-MOH-193812-GO-DIR Pending / 80,000 Nos Micro pipette Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- IDA / 65950 Post Direct Selection Direct 6,316.00 0.00 Implement tips with filter, PCR grade COVID-19 Response 15 20 11 25 ation volume 10-20 mic.l LK-MOH-193814-GO-DIR Pending / 100,000 Nos Micro pipette Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- IDA / 65950 Post Direct Selection Direct 6,710.00 0.00 Implement tips PCR grade volume 0.5- COVID-19 Response 15 20 11 25 ation 10 mic.l LK-MOH-193818-GO-DIR Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- / 17,280 Nos Micro pipette IDA / 65950 Post Direct Selection Direct 1,672.00 0.00 Implement COVID-19 Response 15 20 11 25 tips PCR grade, volume ation 1000 mic.l LK-MOH-193819-GO-DIR Pending / 160,000 Nos Micro pipette Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- IDA / 65950 Post Direct Selection Direct 9,728.00 0.00 Implement tips PCR grade, volume 20- COVID-19 Response 15 20 11 25 ation 200 mic.l LK-MOH-193820-GO-DIR Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- / 40,000 Nos Disposable IDA / 65950 Post Direct Selection Direct 3,084.00 0.00 Implement COVID-19 Response 15 20 11 25 plastic Pasteur pipette, 3ml ation with bulb LK-MOH-195372-GO-RFQ / 05 Nos Photocopy Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2021-01- Machines required for Sri TF / B3017 Post Limited 2,200.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 07 Lanka College of Psychiatry ation under Covid Grant LK-MOH-195378-GO-RFQ / 06 Nos Exercise Machines Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2021-01- required for Sri Lanka TF / B3017 Post Limited 4,737.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 07 Collage of Psychiatry under ation Covid Grant LK-MOH-195413-GO-DIR / 10 Nos Wall Fans for Covid Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- wards at Ragama Teaching IDA / 65950 Post Direct Selection Direct 438.00 0.00 Implement COVID-19 Response 21 26 10 17 Hospital during Covid ation period (Retroactive) LK-MOH-195414-GO-DIR / Hardware item for Micu Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- procured by Ragama IDA / 65950 Post Direct Selection Direct 75.00 0.00 Implement COVID-19 Response 21 26 10 17 Teaching Hospital during ation Covid period (Retroactive) LK-MOH-195419-GO-DIR / Sisili Examination & Pending Component 1: Emergency 2020-09- 2020-09- 2020-10- 2020-10- Surgical Gloves IDA / 65950 Post Direct Selection Direct 5,098,545.00 0.00 Implement COVID-19 Response 21 26 17 31 (25,064,000.00) procured ation by MSD during Covid period (Retroactive) LK-MOH-189311-GO-RFB Pending / 18 Nos. Blood Fluid Component 1: Emergency Single Stage - One 2020-08- 2020-08- 2020-10- 2020-11- 2020-12- 2021-06- IDA / 65950 Post Request for Bids Open - National 23,021.00 0.00 Implement Warmer procured by BME COVID-19 Response Envelope 18 23 04 03 08 06 ation during Covid period LK-MOH-195396-GO-RFQ Pending / 10 Nos Electric Ovens Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2021-01- TF / B3017 Post Limited 947.00 0.00 Implement required for College of COVID-19 Response Quotations Envelope 27 22 21 ation Psychiatry under Covid Grant LK-MOH-195369-GO-RFQ / 02 Unit Electro Convulsive Pending Therapy machines (ECT) Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2021-06- TF / B3017 Post Limited 52,631.00 0.00 Implement required for Sri Lanka COVID-19 Response Quotations Envelope 13 08 06 ation College of Psychiatry under Covid Grant LK-MOH-198065-GO-RFQ / 02 Nos Sphygmomanometer, 02 Nos Glucometer, 02 Nos Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2021-01- Thermometer, 02 Nos TF / B3017 Post Limited 1,379.00 0.00 Implement COVID-19 Response Quotations Envelope 25 20 19 Stethoscope, 02 Nos ation Nebulizer and 20 Nos Walkers for National Institute of Mental Health Day enters under Covid Grant LK-MOH-198066-GO-RFQ / 18 Items of Household Pending and Office equipment items Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2021-01- TF / B3017 Post Limited 20,632.00 0.00 Implement required for Day Center for COVID-19 Response Quotations Envelope 26 21 20 ation Elderly, National Institute of Mental Health, Sri Lanka LK-MOH-198113-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2021-01- / Purchase of Mattress Items IDA / 65950 Post Limited 50,565.00 0.00 Implement COVID-19 Response Quotations Envelope 19 14 13 for Quarantine Centers ation LK-MOH-198116-GO-RFQ / Sanitary Items for Quarantine centers There was an urgent need arisen for expanding the Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- capacity of Quarantine IDA / 65950 Post Limited 17,298.00 0.00 Implement COVID-19 Response Quotations Envelope 19 08 22 Centers and the Covid ation patient management hospitals due to the unexpected community spread of Covid-19 discovered in the Gampaha district, which LK-MOH-198117-GO-RFQ / Furniture for Quarantine centers There was an urgent need arisen for expanding the Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- capacity of Quarantine IDA / 65950 Post Limited 115,991.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 23 Centers and the Covid ation patient management hospitals due to the unexpected community spread of Covid-19 discovered in the Gampaha district, which has LK-MOH-198153-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Glass and Porcelain IDA / 65950 Post Limited 45,777.00 0.00 Implement COVID-19 Response Quotations Envelope 19 11 18 Tableware Items for ation Quarantine centers LK-MOH-198203-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Kitchen Items for IDA / 65950 Post Limited 11,438.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Quarantine centers ation LK-MOH-198212-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Cutlery Sets for IDA / 65950 Post Limited 6,226.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Quarantine centers ation LK-MOH-198220-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Bedding Items for IDA / 65950 Post Limited 97,775.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Quarantine centers ation LK-MOH-198234-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Bed Frames with Bases for IDA / 65950 Post Limited 70,212.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Quarantine centers ation LK-MOH-198567-GO-RFQ Pending / 300 Nos Patient Beds for Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- IDA / 65950 Post Limited 33,158.00 0.00 Implement new Covid treatment center COVID-19 Response Quotations Envelope 17 07 14 ation at Neviel Fernando Hospital LK-MOH-198572-GO-RFQ Pending / Kitchen and Washing Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- IDA / 65950 Post Limited 80,215.00 0.00 Implement Equipment for Quarantine COVID-19 Response Quotations Envelope 19 09 16 ation centers LK-MOH-198575-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Office Furniture for IDA / 65950 Post Limited 5,615.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Quarantine centers ation LK-MOH-198577-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Stationary Items for IDA / 65950 Post Limited 2,126.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Quarantine centers ation LK-MOH-198636-GO-RFB / Equipment for health information management Pending center at disaster Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 263,158.00 0.00 Implement preparedness and response COVID-19 Response Envelope 05 10 22 21 25 24 ation division and Epidemiological unit for strengthening surveillance. LK-MOH-198646-GO-RFQ Pending / 300 Nos Mattresses for Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- IDA / 65950 Post Limited 9,474.00 0.00 Implement New Covid19 Patientcare COVID-19 Response Quotations Envelope 19 09 16 ation center at Neviel Fernando Hospital LK-MOH-198648-GO-RFQ / 300 Nos Bed Sheets, Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- Pillows and Pillow cases for IDA / 65950 Post Limited 1,700.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 New Covid19 Patientcare ation center at Neviel Fernando Hospital LK-MOH-198574-GO-RFQ Pending / Boilers, Scales & Other Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- IDA / 65950 Post Limited 36,937.00 0.00 Implement Equipment for Quarantine COVID-19 Response Quotations Envelope 19 09 16 ation centers LK-MOH-198239-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Computers and a IDA / 65950 Post Limited 10,288.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Photocopier for Quarantine ation centers LK-MOH-198244-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Garden Items for IDA / 65950 Post Limited 36,340.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Quarantine centers ation LK-MOH-198569-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Televisions for Quarantine IDA / 65950 Post Limited 48,653.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 centers ation LK-MOH-198252-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- / Electrical Items for IDA / 65950 Post Limited 26,934.00 0.00 Implement COVID-19 Response Quotations Envelope 19 09 16 Quarantine centers ation LK-MOH-198067-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- / 24 Items of Office TF / B3017 Post Limited 7,525.00 0.00 Implement COVID-19 Response Quotations Envelope 01 27 26 furniture and Hospital ation furniture LK-MOH-199094-GO-RFQ Pending / 07 Nos Multi-para Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-12- IDA / 65950 Post Limited 9,211.00 0.00 Implement monitors to manage the COVID-19 Response Quotations Envelope 19 23 08 ation COVID-19 patients LK-MOH-199382-GO-RFQ / Furniture and other office items to improve the Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- surveillance system at TF / B3017 Post Limited 10,526.00 0.00 Implement COVID-19 Response Quotations Envelope 26 16 23 Epidemiology Unit on ation disaster management e- surveillance system. LK-MOH-199384-GO-RFQ / Supply & instillation of 04 Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- Nos of Air Conditioners to TF / B3017 Post Limited 2,632.00 0.00 Implement COVID-19 Response Quotations Envelope 04 25 02 Epidemiology Unit e- ation surveillance system. LK-MOH-199400-GO-RFQ / Supply, Installation, Testing and Commissioning Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- of Cameras for Health TF / B3017 Post Limited 22,368.00 0.00 Implement COVID-19 Response Quotations Envelope 10 01 08 Promotion Bureau to ation upgrade the public awareness and healthy behaviors. LK-MOH-199543-GO-RFQ / Laptop for Social Medea Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- Platform at Health TF / B3017 Post Limited 7,105.00 0.00 Implement COVID-19 Response Quotations Envelope 04 25 02 Promotion Bureau to ation improve social media platform.. LK-MOH-199725-GO-RFQ / Procurement of Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- referencing test books for TF / B3017 Post Limited 5,263.00 0.00 Implement COVID-19 Response Quotations Envelope 04 25 02 Epidemiology unit for close ation monitoring of e-surveillance system. LK-MOH-199728-GO-RFQ Pending / Public Address System for Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- TF / B3017 Post Limited 526.00 0.00 Implement Nurses Training School, COVID-19 Response Quotations Envelope 04 25 02 ation Mulleriyawa LK-MOH-199729-GO-RFQ Pending / 13 items of Furniture Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-11- TF / B3017 Post Limited 13,636.00 0.00 Implement required for Nursing COVID-19 Response Quotations Envelope 02 23 30 ation Training School Mulleriyawa Page 13 LK-MOH-199738-GO-RFQ Pending / 05 Items of Household Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- TF / B3017 Post Limited 2,525.00 0.00 Implement items required for Nurses COVID-19 Response Quotations Envelope 04 25 02 ation Training School LK-MOH-199745-GO-RFQ / Supply and Installation of Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- 03 Units Air Condition TF / B3017 Post Limited 2,368.00 0.00 Implement COVID-19 Response Quotations Envelope 10 01 08 Machines at Nurses Training ation School, Mulleriyawa LK-MOH-199774-GO-RFQ / 01 No Multimedia Pending Projector, 01 No Large Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- TF / B3017 Post Limited 4,605.00 0.00 Implement Digital Screen and 01 No COVID-19 Response Quotations Envelope 10 01 08 ation Riso Duplo Machine for Nursing Training School Mulleriyawa LK-MOH-199781-GO-RFQ / 01 No Bio Chemistry Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- Analyzer for Covid IDA / 65950 Post Limited 6,316.00 0.00 Implement COVID-19 Response Quotations Envelope 20 08 22 management at Kandy ation Teaching Hospital (Advance procurement) LK-MOH-199786-GO-RFQ / 01 No Bio Safety Cabinet Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- for Covid management at IDA / 65950 Post Limited 9,379.00 0.00 Implement COVID-19 Response Quotations Envelope 20 08 22 Kandy Teaching Hospital ation during Covid period (Advance) LK-MOH-199789-GO-RFQ / 5-Part Hematology Pending Analyzer With CRP capability- Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 20,526.00 0.00 Implement covid-19 patient COVID-19 Response Quotations Envelope 20 08 22 ation management at Kandy Teaching Hospital (Advance Procurement) LK-MOH-199791-GO-RFQ / 03 Nos Hydrogen Peroxide Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- Fogging Machine-covid-19 IDA / 65950 Post Limited 12,553.00 0.00 Implement COVID-19 Response Quotations Envelope 20 08 22 patient management at ation Kandy Teaching Hospital. (Advance) LK-MOH-199792-GO-RFQ Pending / 20000 Envelopes required Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 3,947.00 0.00 Implement for Kandy Teaching hospital COVID-19 Response Quotations Envelope 20 08 22 ation during Covid period (Advance) LK-MOH-199795-GO-RFQ / 39 Items of building Pending maintenance equipment for Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 9,292.00 0.00 Implement Covid patient Management COVID-19 Response Quotations Envelope 20 08 22 ation at Kandy Teaching Hospital (Advance procurement) LK-MOH-199835-GO-RFQ / 12 Nos Stand Fans Pending required for Covid patient Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 502.00 0.00 Implement management at COVID-19 Response Quotations Envelope 20 08 22 ation Anuradhapura Teaching Hospital (Advance procurement) LK-MOH-199845-GO-RFQ / 02 Nos Cupboards with Pending Mirrors required for Covid Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 209.00 0.00 Implement patient management at COVID-19 Response Quotations Envelope 20 08 22 ation Anuradhapura Teaching Hospital (Advance) LK-MOH-199849-GO-RFQ / 50 Nos Dust Bins (Paddle) Pending and 100 Nos Gum Boots Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 1,271.00 0.00 Implement required for Covid patient COVID-19 Response Quotations Envelope 20 08 22 ation management at Anuradhapura Teaching Hospital LK-MOH-199857-GO-RFQ / 01 No Freezer Double Pending Door 250Ltr required for Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 491.00 0.00 Implement Covid patient management COVID-19 Response Quotations Envelope 20 08 22 ation at Anuradhapura Teaching Hospital LK-MOH-200025-GO-RFQ / 02 Nos Washing Machines Pending required for Covid patient Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 581.00 0.00 Implement management at COVID-19 Response Quotations Envelope 21 09 23 ation Anuradhapura Teaching Hospital during Covid period (Advance) LK-MOH-200026-GO-RFQ / 02 Nos Office Cupboards, 01 No Office Cupboard with Glass, 25 Nos Electrical Pending Kettles and 25 Nos Water Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 1,432.00 0.00 Implement Heaters required for Covid COVID-19 Response Quotations Envelope 21 09 23 ation patient management Anuradhapura Teaching Hospital during Covid period (Advance) LK-MOH-200029-GO-RFQ / 25 Nos Paddle Bins Pending required for Covid patient Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 243.00 0.00 Implement management at COVID-19 Response Quotations Envelope 21 09 23 ation Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-200030-GO-RFQ / 25 Nos Electric Jugs, 25 Nos Double Layer Pending Mattresses 6'x3' and Steel Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 1,257.00 0.00 Implement Beds 6'x3' required for COVID-19 Response Quotations Envelope 21 09 23 ation Covid patient management Anuradhapura Teaching Hospital during Covid period. (Advance procurement ) LK-MOH-200031-GO-RFQ / 500 Nos Surgical Gown Pending required for Covid patient Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 4,105.00 0.00 Implement management Anuradhapura COVID-19 Response Quotations Envelope 21 09 23 ation Teaching Hospital during Covid period. (Advance) LK-MOH-200043-GO-RFQ / 08 Nos Polythene Sealers Pending required for Covid patient Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 240.00 0.00 Implement management at COVID-19 Response Quotations Envelope 21 09 23 ation Anuradhapura Teaching Hospital during Covid period. (Advance LK-MOH-200047-GO-RFQ / 25 Nos Gum Boots Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- required for Anuradhapura IDA / 65950 Post Limited 201.00 0.00 Implement COVID-19 Response Quotations Envelope 21 09 23 Teaching Hospital during ation Covid period. (Advance procurement) LK-MOH-200048-GO-RFQ / 500 Nos Surgical Gown Pending required for Covid patient Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 4,105.00 0.00 Implement management at COVID-19 Response Quotations Envelope 21 09 23 ation Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-200050-GO-RFQ / 01 No Laser Printer Pending required for Covid patient Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 86.00 0.00 Implement management at COVID-19 Response Quotations Envelope 21 09 23 ation Anuradhapura Teaching Hospital during Covid period. (Advance procurement) LK-MOH-200053-GO-RFQ / 8000 Mtrs Baby Elastics and 125 Nos White Thone Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- Cone (2500) required for IDA / 65950 Post Limited 253.00 0.00 Implement COVID-19 Response Quotations Envelope 21 09 23 Anuradhapura Teaching ation Hospital during Covid period. (Advance procurement) LK-MOH-200055-GO-RFQ / 150 Mtrs Apron Wax Cloth and 200 Nos Plastic Brooms Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- required for Anuradhapura IDA / 65950 Post Limited 792.00 0.00 Implement COVID-19 Response Quotations Envelope 21 09 23 Teaching Hospital during ation Covid period. (Advance procurement) LK-MOH-200061-GO-RFQ / 1000 Nos White Bed Pending Sheets required for Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 3,658.00 0.00 Implement Anuradhapura Teaching COVID-19 Response Quotations Envelope 21 09 23 ation Hospital during Covid period. (Advance procurement) LK-MOH-200063-GO-RFQ / 08 Items of Office Pending Furniture required for Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 1,284.00 0.00 Implement Anuradhapura Teaching COVID-19 Response Quotations Envelope 21 09 23 ation Hospital during Covid period. (Advance procurement) LK-MOH-200064-GO-RFQ / 500 Mtrs White Raw Cloth Pending required for Anuradhapura Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 776.00 0.00 Implement Teaching Hospital during COVID-19 Response Quotations Envelope 21 09 23 ation Covid period. (Advance procurement) LK-MOH-200067-GO-RFQ / 02 Nos Industrial Stand Pending Fans equired for Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 241.00 0.00 Implement Anuradhapura Teaching COVID-19 Response Quotations Envelope 21 09 23 ation Hospital during Covid period. (Advance procurement) LK-MOH-200068-GO-RFQ / 01 No Air Conditioner, 01 No Steel Table, 11 Nos Refrigerators, 01 No Fully Pending Automatic Washing Machine Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 1,583.00 0.00 Implement and 01 No Cold & Hot Water COVID-19 Response Quotations Envelope 21 09 23 ation Dispenser required for Anuradhapura Teaching Hospital during Covid period. (Advance procurement) LK-MOH-200069-GO-RFQ / 100 Nos Doctor Overalls Pending required for Anuradhapura Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 821.00 0.00 Implement Teaching Hospital during COVID-19 Response Quotations Envelope 21 09 23 ation Covid period. (Advance procurement) LK-MOH-200070-GO-RFQ / 500 Nos hospital attires Pending required for Anuradhapura Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 3,579.00 0.00 Implement Teaching Hospital during COVID-19 Response Quotations Envelope 21 09 23 ation Covid period. (Advance procurement) LK-MOH-200071-GO-RFQ / 300 Nos Hospital Attires Pending (Small) required for Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 2,147.00 0.00 Implement Anuradhapura Teaching COVID-19 Response Quotations Envelope 21 09 23 ation Hospital during Covid period. (Advance procurement) LK-MOH-200075-GO-RFQ / 740 Nos Half Shoes Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- required for Anuradhapura IDA / 65950 Post Limited 5,238.00 0.00 Implement COVID-19 Response Quotations Envelope 21 09 23 Teaching Hospital during ation Covid period. (Advance procurement) LK-MOH-200076-GO-RFQ / 02 Nos Desk Tops, 01 No Laser jet Printer, 01 No Mini Pending Sub Woofer and 01 No UPS Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 1,753.00 0.00 Implement required for Anuradhapura COVID-19 Response Quotations Envelope 21 09 23 ation Teaching Hospital during Covid period. (Advance rocurement) LK-MOH-200080-GO-RFQ / 300 Nos hospital attires Pending required for Anuradhapura Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 615.00 0.00 Implement Teaching Hospital during COVID-19 Response Quotations Envelope 21 09 23 ation Covid period. (Advance procurement) LK-MOH-200082-GO-RFQ / 03 Nos Stand Fans, 03 Nos Exhaust Fans, 03 Nos Wall Pending Fans and 10 nos Wall Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 387.00 0.00 Implement Hangers required for COVID-19 Response Quotations Envelope 21 09 23 ation Anuradhapura Teaching Hospital during Covid period. (Advance procurement) LK-MOH-200095-GO-RFQ / 100 Nos Bath Towels and Pending 300 Nos Pijamas required Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 2,616.00 0.00 Implement for Anuradhapura Teaching COVID-19 Response Quotations Envelope 21 09 23 ation Hospital during Covid period. (Advance procurement) LK-MOH-200097-GO-RFQ / 07 Items of Hardware and Pending house Hold items required Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 246.00 0.00 Implement for Anuradhapura Teaching COVID-19 Response Quotations Envelope 21 09 23 ation Hospital during Covid period. (Advance procurement) LK-MOH-200112-GO-RFQ / 09 Items of Building Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- Materials required for IDA / 65950 Post Limited 1,686.00 0.00 Implement COVID-19 Response Quotations Envelope 21 09 23 Anuradhapura Teaching ation Hospital during Covid period. (Advance) LK-MOH-200113-GO-RFQ / 5000 Nos Soap, 1000 Nos Hand Wash, 25 Nos Dust Pending Bins and 5000 Pkts Paper Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 5,094.00 0.00 Implement Serviette required for COVID-19 Response Quotations Envelope 21 09 23 ation Anuradhapura Teaching Hospital during Covid period. (Advance Procurement) LK-MOH-200121-GO-RFQ / IT and Office Equipment for health information Component 2: management center at Strengthening National and Pending Request for Single Stage - One 2020-11- 2020-12- 2021-01- disaster preparedness and IDA / 65950 Sub-national Institutions Post Limited 132,631.00 0.00 Implement Quotations Envelope 03 22 05 response division and for Prevention and ation Epidemiological unit for Preparedness strengthening surveillance island wide. LK-MOH-200128-GO-RFQ / 19 Nos DSLR Cameras and 01 No Document Camera Component 2: for health information Strengthening National and Pending management center at Request for Single Stage - One 2020-11- 2020-12- 2021-01- IDA / 65950 Sub-national Institutions Post Limited 10,526.00 0.00 Implement disaster preparedness and Quotations Envelope 04 23 06 for Prevention and ation response division and Preparedness Epidemiological unit for strengthening surveillance island wide. LK-MOH-200132-GO-RFQ / 06 items of Audio and Video Equipment and accessories (Items list under Component 2: comments) required for Strengthening National and Pending Request for Single Stage - One 2020-10- 2020-12- 2020-12- health information IDA / 65950 Sub-national Institutions Post Limited 1,432.00 0.00 Implement Quotations Envelope 22 10 24 management center at for Prevention and ation disaster preparedness and Preparedness response division and Epidemiological unit for strengthening surveillance. LK-MOH-201167-GO-DIR / 25,000 Nos. Magnetic Pending Component 1: Emergency 2020-10- 2020-10- 2020-11- 2020-11- Bead RNA and RT-qPCR Test IDA / 65950 Post Direct Selection Direct 750,000.00 0.00 Implement COVID-19 Response 26 31 14 28 Kits (with Master Mix) ation (Penta Base - TM Test Kits) LK-MOH-201169-GO-RFQ Pending / 50,000 Nos Goggles for Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 96,154.00 0.00 Implement Emergency Infectious COVID-19 Response Quotations Envelope 09 14 28 ation Condition LK-MOH-201170-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- / 5,000 Nos Personal IDA / 65950 Post Limited 178,571.00 0.00 Implement COVID-19 Response Quotations Envelope 03 08 22 Protective Equipment (PPE) ation Set LK-MOH-201171-GO-RFQ Pending / 60,000 Nos Isolation gown Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 148,352.00 0.00 Implement for Emergency Infectious COVID-19 Response Quotations Envelope 03 08 22 ation Condition LK-MOH-201172-GO-RFQ Pending / 50,000 Nos Protective Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 153,846.00 0.00 Implement coverall for Emergency COVID-19 Response Quotations Envelope 03 08 22 ation Infectious Condition LK-MOH-201174-GO-RFQ Pending / 250000 Nos Shoe covers / Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 178,571.00 0.00 Implement Boot covers for Emergency COVID-19 Response Quotations Envelope 03 08 22 ation Infectious Condition Page 14 LK-MOH-201175-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- / 2,500,000 Nos Surgical IDA / 65950 Post Limited 151,098.00 0.00 Implement COVID-19 Response Quotations Envelope 03 08 22 Face Masks ation LK-MOH-201420-GO-RFB Pending / 190,000 Isolation gown Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-01- 2021-03- IDA / 65950 Post Request for Bids Open - National 467,033.00 0.00 Implement for Emergency Infectious COVID-19 Response Envelope 10 15 27 10 31 17 ation Condition LK-MOH-201421-GO-RFB Pending / 200,000 Nos Protective Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-01- 2021-02- IDA / 65950 Post Request for Bids Open - National 769,231.00 0.00 Implement coverall for Emergency COVID-19 Response Envelope 10 15 27 03 24 23 ation Infectious Condition LK-MOH-201422-GO-RFB Pending Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-01- 2021-02- / 2,500,000 Nos Surgical IDA / 65950 Post Request for Bids Open - National 151,099.00 0.00 Implement COVID-19 Response Envelope 10 15 27 03 24 23 Face Mask ation LK-MOH-201426-GO-RFB Pending / 250,000 Nos Particulate Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-01- 2021-02- IDA / 65950 Post Request for Bids Open - National 412,088.00 0.00 Implement Respirator for Emergency COVID-19 Response Envelope 10 15 27 03 24 23 ation Infectious Condition LK-MOH-201428-GO-RFQ Pending / 100,000 Nos Particulate Component 1: Emergency Request for Single Stage - One 2020-10- 2020-12- 2020-12- IDA / 65950 Post Limited 164,835.00 0.00 Implement Respirator for Emergency COVID-19 Response Quotations Envelope 31 05 19 ation Infectious Condition LK-MOH-201544-GO-RFQ / 04 Items of House Hold Pending equipment (6 Refrigerator Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 5,769.00 0.00 Implement Single door) ( 3 Refrigerator COVID-19 Response Quotations Envelope 09 12 26 ation Double door , 2 Washing machine, 12 TV(32") LK-MOH-201644-GO-RFQ Pending / Furniture required for new Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 50,893.00 0.00 Implement infection disease building in COVID-19 Response Quotations Envelope 10 13 27 ation Kilinochchi LK-MOH-201645-GO-RFQ Pending / 01 No Generator set for Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 21,978.00 0.00 Implement new infections disease COVID-19 Response Quotations Envelope 10 13 27 ation hospital in Kilinochchi LK-MOH-201646-GO-RFQ / 03 Units of Reverse Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Osmosis systems plants for IDA / 65950 Post Limited 6,593.00 0.00 Implement COVID-19 Response Quotations Envelope 10 13 27 new infections disease ation hospital in Kilinochchi LK-MOH-201647-GO-RFQ Pending / 100 Nos Street Lamps Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 2,198.00 0.00 Implement required for new infections COVID-19 Response Quotations Envelope 10 13 27 ation disease hospital in Kilinochchi LK-MOH-201648-GO-RFQ Pending / 02 Nos Dryers required for Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 3,297.00 0.00 Implement new infections disease COVID-19 Response Quotations Envelope 10 13 27 ation hospital in Kilinochchi LK-MOH-201649-GO-RFQ Pending / Sound System required for Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 2,742.00 0.00 Implement new infections disease COVID-19 Response Quotations Envelope 10 13 27 ation hospital in Kilinochchi LK-MOH-201650-GO-RFQ / 06 Nos Air Conditioners (24,000 BTU) and 04 Nos Air Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Conditioner Units (18,000 IDA / 65950 Post Limited 9,341.00 0.00 Implement COVID-19 Response Quotations Envelope 10 13 27 Btu) required for ation Consultants quarters at the new infections disease hospital in Kilinochchi LK-MOH-201651-GO-RFQ / Supply and Installation of suitable Pending tele/visual/audio/online Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- IDA / 65950 Post Limited 16,484.00 0.00 Implement communication facilities COVID-19 Response Quotations Envelope 23 26 09 ation with CCTV cameras at the new infections disease hospital in Kilinochchi. LK-MOH-201653-GO-RFQ Pending / 12 Nos Led Monitors for Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- IDA / 65950 Post Limited 1,429.00 0.00 Implement the new infections disease COVID-19 Response Quotations Envelope 17 20 03 ation hospital in Kilinochchi LK-MOH-201853-GO-RFQ / Banner Stand for Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- Valikanda Covid patient IDA / 65950 Post Limited 129.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 Center- Polonnaruwa DGH ation (Advance Procurement) LK-MOH-201854-GO-RFQ / 16 items of Assorted items for partitioning of Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- Covid patient isolation IDA / 65950 Post Limited 2,673.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 center at Welikanda Hospital ation during Covid period (Advance Proc.) (List as per annex) LK-MOH-201855-GO-RFQ / 35 Assorted items for fixing doors partitioning for Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- isolation at Welikanda IDA / 65950 Post Limited 1,068.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 Hospital during Covid ation period (Advance Proc.) (List as per annex) LK-MOH-201856-GO-RFQ / 100 Nos Prifiler Sanitizer Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- required by Walikanda IDA / 65950 Post Limited 4,670.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 Hospital during Covid ation period (Advance Proc.) LK-MOH-201857-GO-RFQ / 11 associated items for Electrical wiring for Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- Walikander Covid patient IDA / 65950 Post Limited 237.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 center during Covid ation period.(Advance Proc.) (List attached) LK-MOH-201858-GO-RFQ / 07 hardware items Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- required by Walikanda Covid IDA / 65950 Post Limited 2,084.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 patient Hospital during ation Covid period.( List attached) (Advance proc.) LK-MOH-201859-GO-RFQ / 05 items of cleaning Pending materials required by Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- IDA / 65950 Post Limited 1,852.00 0.00 Implement Walikanda Covid patient COVID-19 Response Quotations Envelope 02 28 05 ation center during Covid period (List attached) (Advance Proc.) LK-MOH-201861-GO-RFQ / 03 items of disinfectants Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- required by Walikanda Covid IDA / 65950 Post Limited 1,966.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 patient center List as per ation annex) (Advance proc.) LK-MOH-201862-GO-RFQ / 07 Electrical consumables Pending required by Walikanda Covid Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- IDA / 65950 Post Limited 152.00 0.00 Implement patient center during Covid COVID-19 Response Quotations Envelope 02 28 05 ation period. (List attached) Advance proc.) LK-MOH-201864-GO-RFQ / 05 cleaning items required Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- by Walikanda Covid patient IDA / 65950 Post Limited 1,343.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 center during Covid period ation (List attached) (Advance proc.) LK-MOH-201865-GO-RFQ / 30,000 Nos Shopping Pending bags & 50,000 Nos Grocery Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- IDA / 65950 Post Limited 599.00 0.00 Implement Bags required by Walikanda COVID-19 Response Quotations Envelope 02 28 05 ation Covid patient center during Covid period LK-MOH-201866-GO-RFQ / 80,000 Nos Garbage bags Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- required by Walikanda Covid IDA / 65950 Post Limited 4,125.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 patient center during Covid ation period (Advance proc.) LK-MOH-201867-GO-RFQ / 09 Household Items Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- required by Walikanda Covid IDA / 65950 Post Limited 1,035.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 patient center during Covid ation period (liast attached (Advance proc.) LK-MOH-201869-GO-RFQ / 06 items of Hospital Attires for Hospital staff Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- required by Welikanda Covid IDA / 65950 Post Limited 3,901.00 0.00 Implement COVID-19 Response Quotations Envelope 02 28 05 patient center during Covid ation period(List attached) (Advance Proc.) LK-MOH-202150-GO-RFQ / 750 Check Bed Sheet Pending Cloths & 750 White Bed Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- IDA / 65950 Post Limited 5,139.00 0.00 Implement Sheet Cloth required COVID-19 Response Quotations Envelope 04 30 07 ation Polonnaruwa DH during Covid period, Advance proc.) LK-MOH-202151-GO-RFQ / 55 Associated materials Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- for partitioning at IDA / 65950 Post Limited 9,225.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 07 Polonnaruwa DH during ation Covid period (List attached) (Advance proc.) LK-MOH-202152-GO-RFQ / 61 Plumbing and Pending associated items required Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- IDA / 65950 Post Limited 763.00 0.00 Implement for Polonnaruwa DH during COVID-19 Response Quotations Envelope 04 30 07 ation Covid period. (List attached) (Advance proc) LK-MOH-202153-GO-RFQ / 33 Items of Paint, Pending Plumbing and associated Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- IDA / 65950 Post Limited 411.00 0.00 Implement materials required for COVID-19 Response Quotations Envelope 04 30 07 ation Polonnaruwa DH during Covid period. list attached) (Advance proc.) LK-MOH-202154-GO-RFQ / 37 Items of Hardware Pending materials required by Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- IDA / 65950 Post Limited 309.00 0.00 Implement Polonnaruwa DH during COVID-19 Response Quotations Envelope 04 30 07 ation Covid period. (List attached) (Advance proc) LK-MOH-202155-GO-RFQ / 36 Items of Aluminum petitioning materials and Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- other associated materials IDA / 65950 Post Limited 2,416.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 07 required by Polonnaruwa DH ation during Covid period. (List attached) (Advance proc) LK-MOH-202156-GO-RFQ / 40 mtrs 16mm Aluminum Pending Wire, 01 no 70 Amp MCBC Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- IDA / 65950 Post Limited 138.00 0.00 Implement and 10 Nos 16x8 Lugs COVID-19 Response Quotations Envelope 04 30 07 ation required by Polonnaruwa DH during Covid period. (Advance proc) LK-MOH-202157-GO-RFQ / 02 Nos Photocopy Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- Machines required by IDA / 65950 Post Limited 1,937.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 07 Polonnaruwa DH during ation Covid period. (Advance proc) LK-MOH-202159-GO-RFQ / 100 Nos Baskets, 50 Nos Pillows, 50 Mosquito Nets Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- and 250 Mtrs white IDA / 65950 Post Limited 207.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 07 Polythene required by ation Polonnaruwa DH during Covid period. (Advance Proc.) LK-MOH-202160-GO-RFQ / 100 Nos Multi Plug Base Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- required by Polonnaruwa DH IDA / 65950 Post Limited 319.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 07 during Covid period. ation (Advance Proc.) LK-MOH-202161-GO-RFQ / Supply and installation of 03 Nos 12,000 BTU Air Conditioners, 11 Nos 18,000 BTU Air Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-12- Conditioners, 08 Nos IDA / 65950 Post Limited 21,374.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 07 24,000 BTU Air ation Conditioners and 7 Nos 36,000 BTU air Conditioners required by Walikanda treatment Polonnaruwa DH during Covid period. (Advance Proc.) LK-MOH-202363-GO-RFQ / 06 nos Working Pending Cupboards and 05 Nos Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 1,457.00 0.00 Implement Towel Racks required by COVID-19 Response Quotations Envelope 05 01 08 ation Polonnaruwa DH during Covid period (Advance proc.) LK-MOH-202364-GO-RFQ / 30 nos Tables, 30 Nos Almirahs, 20 Nos Bok Racks, Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- 10 Nos Shoe Racks and 03 IDA / 65950 Post Limited 5,005.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Nos Mirrors required by ation Polonnaruwa DH during Covid period (Advance proc.) LK-MOH-202365-GO-RFQ / 60 Ltrs Emulsion paints, 60Ltrs Weather Guard Paints Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- and 100 nos Sand Papers IDA / 65950 Post Limited 578.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 required by Polonnaruwa DH ation during Covid period (Advance proc.) LK-MOH-202366-GO-RFQ / 20 Nos Stand Fans and 30 Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Nos Civiling Fans required IDA / 65950 Post Limited 1,923.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 by Polonnaruwa DH during ation Covid period (Advance proc.) LK-MOH-202367-GO-RFQ / 25 Nos Shopping Trolleys Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- required by Polonnaruwa DH IDA / 65950 Post Limited 2,740.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 during Covid period ation (Advance proc.) LK-MOH-202368-GO-RFQ / 200 Nos Pillow Cases, 60 Pending Pairs Half Shoes and 03 Nos Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 709.00 0.00 Implement Carrot Beaters required by COVID-19 Response Quotations Envelope 05 01 08 ation Polonnaruwa DH during Covid period (Advance proc.) LK-MOH-202369-GO-RFQ / 50Nos Shavers and 300 Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Nos Toilet Bowl Cleaners IDA / 65950 Post Limited 221.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 required by Polonnaruwa DH ation during Covid period (Advance proc.) LK-MOH-202370-GO-RFQ / 10Nos Industrial Fans Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- required by Polonnaruwa DH IDA / 65950 Post Limited 841.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 during Covid period ation (Advance proc.) LK-MOH-202371-GO-RFQ / 06 Items of Electrical Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- consumables required by IDA / 65950 Post Limited 978.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period (Advance proc.) LK-MOH-202372-GO-RFQ / 04 items of electrical Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- consumables required by IDA / 65950 Post Limited 751.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period. (Advance proc,) LK-MOH-202373-GO-RFQ / 60 Items of Hardware materials required for Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- patient treatment centers IDA / 65950 Post Limited 12,381.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 required by Polonnaruwa DH ation during Covid period.(List attached) (Advance proc,) LK-MOH-202374-GO-RFQ / 42 items of Hardware materials required for Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- patient treatment centers IDA / 65950 Post Limited 10,531.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 required by Polonnaruwa DH ation during Covid period.(As per attached list) (Advance proc,) Page 15 LK-MOH-202375-GO-RFQ / 9 items of Electrical consumables for patient Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- treatment centers required IDA / 65950 Post Limited 440.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 by Polonnaruwa DH during ation Covid period.(As per attached list) (Advance proc,) LK-MOH-202376-GO-RFQ / 24 items of Hardware materials for patient Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- treatment centers required IDA / 65950 Post Limited 429.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 by Polonnaruwa DH during ation Covid period.(As per attached list) (Advance proc,) LK-MOH-202377-GO-RFQ / 10Nos Desktop Pending Computers for patient Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 6,484.00 0.00 Implement treatment centers required COVID-19 Response Quotations Envelope 05 01 08 ation by Polonnaruwa DH during Covid period.(As per attached list) (Advance proc,) LK-MOH-202379-GO-RFQ / 05 items of Electrical Pending consumables required by Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 907.00 0.00 Implement Polonnaruwa DH during COVID-19 Response Quotations Envelope 05 01 08 ation Covid period (List attached). (Advance proc,) LK-MOH-202380-GO-RFQ / 12 items of Electrical Pending consumables required by Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 520.00 0.00 Implement Polonnaruwa DH during COVID-19 Response Quotations Envelope 05 01 08 ation Covid period. (List attached) (Advance Proc.) LK-MOH-202381-GO-RFQ / 13 items of plumbing Pending consumables required by Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 297.00 0.00 Implement Polonnaruwa DH during COVID-19 Response Quotations Envelope 05 01 08 ation Covid period. (List attached) (Advance Proc.) LK-MOH-202382-GO-RFQ / 12 Items of Pain and Pending Painting materials required Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 228.00 0.00 Implement by Polonnaruwa DH during COVID-19 Response Quotations Envelope 05 01 08 ation Covid period. (List attached) (Advance Proc.) LK-MOH-202383-GO-RFQ / 11 items of Electrical Pending consumables required by Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 1,513.00 0.00 Implement Polonnaruwa DH during COVID-19 Response Quotations Envelope 05 01 08 ation Covid period. (Last attached) (Advance proc.) LK-MOH-202384-GO-RFQ / 03 Nos Transport Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Ventilators required by IDA / 65950 Post Limited 32,060.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period. (Advance proc.) LK-MOH-202385-GO-RFQ / 20 Nos Digital Blood Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Pressure Meters required by IDA / 65950 Post Limited 663.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period. (Advance proc.) LK-MOH-202386-GO-RFQ / 12 items of PCR testing Pending Consumables (List attached) Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 12,268.00 0.00 Implement required by Polonnaruwa DH COVID-19 Response Quotations Envelope 05 01 08 ation during Covid period. (Advance proc.) LK-MOH-202387-GO-RFQ / 03 Nos ICU Ventilators Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- required by Polonnaruwa DH IDA / 65950 Post Limited 49,450.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 during Covid period ation (Advance Proc.) LK-MOH-202388-GO-RFQ / 01 No Bio Safety Cabinet Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- (Double use) required by IDA / 65950 Post Limited 9,791.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period (Advance Proc.) LK-MOH-202389-GO-RFQ / 01 no Sealed Bucket Safety Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Cabinet Centrifuge required IDA / 65950 Post Limited 3,862.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 by Polonnaruwa DH during ation Covid period. (advance proc.) LK-MOH-202390-GO-RFQ / 05 Parts of Hematology Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Analyzer required by IDA / 65950 Post Limited 17,582.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period. (Advance Proc.) LK-MOH-202391-GO-RFQ / 01 No Portable Digital X- Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Ray Machine required by IDA / 65950 Post Limited 54,670.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period. (Advance Proc.) LK-MOH-202392-GO-RFQ / 03 Nos transport Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Ventilators required by IDA / 65950 Post Limited 32,504.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period. (Advance Proc.) LK-MOH-202393-GO-RFQ / 02 Nos ECG machines Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- required by Polonnaruwa DH IDA / 65950 Post Limited 4,495.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 during Covid period. ation (Advance procurement) LK-MOH-202414-GO-RFQ Pending / 06 Nos Defibrillators Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 32,504.00 0.00 Implement required by Plonnaruwa DH COVID-19 Response Quotations Envelope 05 01 08 ation during Covid period. (Advance Proc.) LK-MOH-202415-GO-RFQ / 50 Nos Stethoscopes Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- required during Covid IDA / 65950 Post Limited 1,332.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 period by Polonnaruwa ation DGH. (Advance proc.) LK-MOH-202417-GO-RFQ / 100 Nos Blood Pressure Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Apparatus required during IDA / 65950 Post Limited 6,044.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Covid period by ation Polonnaruwa DGH. (Advance proc.) LK-MOH-202419-GO-RFQ / 10Nos Infrared Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Thermometers required by IDA / 65950 Post Limited 975.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period. (Advance proc.) LK-MOH-202420-GO-RFQ / 10 Nos Suction Apparatus Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- - double Jar required by IDA / 65950 Post Limited 16,401.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DH during ation Covid period. (Advance proc.) LK-MOH-202421-GO-RFQ / 01 No Portable RO Plant Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- required by Polonnaruwa DH IDA / 65950 Post Limited 2,473.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 during Covid period. ation (Advance proc.) LK-MOH-202422-GO-RFQ / 08 Nos Bi-PAP required Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- during Covid period by IDA / 65950 Post Limited 51,868.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DGH (Advance ation proc.) LK-MOH-202423-GO-RFQ / 05 Nos ICU Beds required Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- during Covid period by IDA / 65950 Post Limited 13,695.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 Polonnaruwa DGH (Advance ation proc.) LK-MOH-202424-GO-RFQ / Supply and Installation of Pending AC Plant and Ventilator unit Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- IDA / 65950 Post Limited 41,717.00 0.00 Implement during Covid period by COVID-19 Response Quotations Envelope 05 01 08 ation Polonnaruwa DGH. (Advance proc.) LK-MOH-202425-GO-RFQ / 100 Nos Overhead Tables Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- required during Covid IDA / 65950 Post Limited 8,011.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 period by Polonnaruwa ation DGH. (Advance proc.) LK-MOH-202427-GO-RFQ / 04 Nos Video Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- Laryngoscope required IDA / 65950 Post Limited 13,077.00 0.00 Implement COVID-19 Response Quotations Envelope 05 01 08 during Covid period by ation Polonnaruwa DGH. (Advance proc.) LK-MOH-202429-GO-RFQ / 14 Items of materials Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2020-12- required for Fencing work at IDA / 65950 Post Limited 25,259.00 0.00 Implement COVID-19 Response Quotations Envelope 10 13 27 Covid 19 Patient Treatment ation Center. (List Attached) LK-MOH-203382-GO-DIR / 20 Nos Medical Air 47 Ltr Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- Standard Cylinders and 02 IDA / 65950 Post Limited 3,133.00 0.00 Implement COVID-19 Response Quotations Envelope 17 20 03 Nos Nitrous 47Ltrs Standard ation Cylinders LK-MOH-203405-GO-RFQ / 10 Nos Chairs, 14 Nos Pending Office Cupboard (with racks Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- TF / B3017 Post Limited 3,679.00 0.00 Implement & Glass doors)and 01 No COVID-19 Response Quotations Envelope 24 29 28 ation Cupboard with locker for Mental Health Directorate. (Grant) LK-MOH-203411-GO-RFQ Pending / 10Items of IT and Office Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- TF / B3017 Post Limited 33,191.00 0.00 Implement equipment for Mental Heath COVID-19 Response Quotations Envelope 24 29 28 ation Directorate. (Grant) LK-MOH-203439-GO-RFB / Desktop Computers with UPS 1363 Nos, Low end Multi function Photocopier 1353 Nos, Laptop 34 Nos Pending Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2020-12- 2021-01- 2021-03- Multimedia Projector 13 Nos IDA / 65950 Post Request for Bids Open - National 1,886,423.00 0.00 Implement COVID-19 Response Envelope 12 17 08 22 19 20 and Portable Hard Disc 2 TB ation 05 Nos for Epidemiology unit , NIHS , 982 hospitals in all districts for disaster management LK-MOH-203455-GO-RFQ / Supply, Installation, Pending Testing and commissioning Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- TF / B3017 Post Limited 38,162.00 0.00 Implement of 12 Items of Audio Visual COVID-19 Response Quotations Envelope 24 19 18 ation Equipment for Health Promotion Bureau. (Grant) LK-MOH-199380-GO-RFQ / IT and Office equipment to Component 1: Emergency Request for Single Stage - One 2020-11- 2020-11- 2020-11- TF / B3017 Post Limited 264,806.00 0.00 Canceled improve the surveillance COVID-19 Response Quotations Envelope 01 22 29 system LK-MOH-203576-GO-RFB / Supply and Installation of Pending 10 Nos Multi Para Monitors Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 11,622.00 0.00 Implement (Basic) at General Hospital, COVID-19 Response Envelope 07 12 24 23 27 26 ation Badulla during Covid period wave 1(Advance) LK-MOH-203577-GO-RFB / Supply and installation of Pending 03 Nos Multipara Monitors Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 53,514.00 0.00 Implement (ICU) for General Hospital, COVID-19 Response Envelope 07 12 24 23 27 26 ation Badulla during Covid period wave 1. (Advance) LK-MOH-203578-GO-RFB / Supply and Installation of Pending 01 No Ultra sound Scanner Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 53,243.00 0.00 Implement required by General COVID-19 Response Envelope 07 12 24 23 27 26 ation Hospital, Badulla during Covid period wave 1 (Advance) LK-MOH-203579-GO-RFB / Supply and Installation of Pending 02 Nos Patient Warmers are Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 3,351.00 0.00 Implement required by General COVID-19 Response Envelope 07 12 24 23 27 26 ation Hospital, Badulla during Covid period wave 1 (Advance) LK-MOH-203580-GO-RFB / 10 Nos portable Suckers Pending Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- are required by General IDA / 65950 Post Request for Bids Open - National 9,719.00 0.00 Implement COVID-19 Response Envelope 07 12 24 23 27 26 Hospital, Badulla during ation Covid period wave 1. (Advance) LK-MOH-203582-GO-RFB / 02 Nos Defibrillators Pending Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- required by General IDA / 65950 Post Request for Bids Open - National 9,568.00 0.00 Implement COVID-19 Response Envelope 07 12 24 23 27 26 Hospital, Badulla during ation Covid period wave 1. (Advance) LK-MOH-203583-GO-RFB / 02 Nos ECG machines Pending Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- required by General IDA / 65950 Post Request for Bids Open - National 1,297.00 0.00 Implement COVID-19 Response Envelope 07 12 24 23 27 26 Hospital, Badulla during ation Covid period wave 1. (Advance) LK-MOH-203584-GO-RFB / 01 Unit X-Ray mobile Pending Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- Machine required by General IDA / 65950 Post Request for Bids Open - National 24,541.00 0.00 Implement COVID-19 Response Envelope 07 12 24 23 27 26 Hospital, Badulla during ation Covid period wave 1. (Advance) LK-MOH-203585-GO-RFB / Supply & installation of central Monitoring system Pending Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- with 03 Nos of ICU IDA / 65950 Post Request for Bids Open - National 53,514.00 0.00 Implement COVID-19 Response Envelope 07 12 24 23 27 26 Multipara Monitors required ation by General Hospital, Badulla during Covid period wave 1 (Advance) LK-MOH-203587-GO-RFB / Supply & Installation of 0 Pending No Ultra Sound scanner Gyn Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 37,838.00 0.00 Implement & Obs. required by General COVID-19 Response Envelope 07 12 24 23 27 26 ation Hospital, Badulla during Covid period wave 1 (Advance) LK-MOH-203588-GO-RFB / Supply and Installation of Pending 02 Nos Bio Safety Cabinet - Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 15,178.00 0.00 Implement Class ii A required by COVID-19 Response Envelope 07 12 24 23 27 26 ation General Hospital, Badulla during Covid period wave 1 (Advance) LK-MOH-203589-GO-RFB / Supply and Installation of Pending 01 No Real Time PCR Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 21,622.00 0.00 Implement Machine required by General COVID-19 Response Envelope 07 12 24 23 27 26 ation Hospital, Badulla during Covid period wave 1 (Advance) LK-MOH-203590-GO-RFB / Supply and Installation of Pending 01 No PCR Hood required Component 1: Emergency Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 65950 Post Request for Bids Open - National 4,222.00 0.00 Implement by General Hospital, Badulla COVID-19 Response Envelope 07 12 24 23 27 26 ation during Covid period wave 1 (Advance) LK-MOH-203643-GO-RFQ / 05 Nos Micro Pipets Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- required by General IDA / 65950 Post Limited 5,189.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 07 Hospital, Badulla during ation Covid period wave 1 (Advance) LK-MOH-203642-GO-RFQ / PCR Reagent required by Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- General Hospital, Badulla IDA / 65950 Post Limited 10,946.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 07 during Covid period wave 1. ation (Advance) LK-MOH-203644-GO-RFQ / PCR Reagents required by Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- General Hospital, Badulla IDA / 65950 Post Limited 21,862.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 07 during Covid period wave 1. ation (Advance) LK-MOH-203645-GO-RFQ / Supply and Installation of Pending Micro Centrifuge required Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- IDA / 65950 Post Limited 3,649.00 0.00 Implement by General Hospital, Badulla COVID-19 Response Quotations Envelope 13 08 07 ation during Covid period wave 1. (Advance) Page 16 LK-MOH-203646-GO-RFQ / 01 No. Heat Block Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- required by General IDA / 65950 Post Limited 438.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 07 Hospital, Badulla during ation Covid period wave 1. (Advance) LK-MOH-203647-GO-RFQ / 783 Nos Overall Kits Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- required by General IDA / 65950 Post Limited 5,399.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 07 Hospital, Badulla during ation Covid period wave 1. (Advance) LK-MOH-203648-GO-RFQ / 10 Nos Infrared Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- Thermometers required by IDA / 65950 Post Limited 1,000.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 07 General Hospital, Badulla ation during Covid period wave 1. (Advance) LK-MOH-203654-GO-RFQ / 40 Nos Sink (Large), 35 Kg 12mm Wire, 30 Nos Welding Pending Cross, 100 Nos Stop Vane Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 1,951.00 0.00 Implement and 25 Nos Swan Nec Taps COVID-19 Response Quotations Envelope 13 01 15 ation required for Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-203655-GO-RFQ / 12 Items of Plumbing Pending materials required for Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 1,331.00 0.00 Implement Anuradhapura Teaching COVID-19 Response Quotations Envelope 13 01 15 ation Hospital during Covid period. (Advance) LK-MOH-203656-GO-RFQ / 06 Items of Plumbing Pending materials required for Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 446.00 0.00 Implement Anuradhapura Teaching COVID-19 Response Quotations Envelope 13 01 15 ation Hospital during Covid period. (Advance) LK-MOH-203657-GO-RFQ / 500 Nos 7 x 10 Garbage Bags and 6,000 Packets of Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- Paper Serviette required for IDA / 65950 Post Limited 2,065.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Anuradhapura Teaching ation Hospital during Covid period.(Advance) LK-MOH-203658-GO-RFQ / 14 Items of Aluminum Bars and accessories Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- required for partitioning IDA / 65950 Post Limited 740.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 works for Anuradhapura ation Teaching Hospital during Covid period.(Advance) LK-MOH-203660-GO-RFQ / 32 Items of Aluminium Bars & Accessories Pending Required for Partitioning & Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 2,653.00 0.00 Implement Assorted items for wiring COVID-19 Response Quotations Envelope 13 01 15 ation required for Anuradhapura Teaching Hospital during Covid period.(Advance) LK-MOH-203661-GO-RFQ / 16 Associated items for Pending wiring (List attached) Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 1,699.00 0.00 Implement required for Anuradhapura COVID-19 Response Quotations Envelope 13 01 15 ation Teaching Hospital during Covid period.(Advance) LK-MOH-203662-GO-RFQ / 12 Items of Aluminium associated items for Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- partitioning work required IDA / 65950 Post Limited 598.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 for Anuradhapura Teaching ation Hospital during Covid period.(Advance) LK-MOH-203664-GO-RFQ / 35 Items of Aluminium Bars and Accessories for Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- partitioning required for IDA / 65950 Post Limited 1,148.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Anuradhapura Teaching ation Hospital during Covid period.(Advance) LK-MOH-203665-GO-RFQ / 400 Mtrs Poplin cloth, 500 Nos Baby Pampas, 200 Nos 1/2 aplastic pins, 25 Nos Mop Buckets, 30 Nos Plastic Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- wash basin (Medium), 200 IDA / 65950 Post Limited 1,832.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Nos 2'' binding tape, 1000 ation Nos Transparent sheet ,300 Mtrs 1/2 Elastic, 25 Nos Plastic dual pane required for Anuradhapura LK-MOH-203666-GO-RFQ / 14 Items of Aluminium Bars and accessories for Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- Partitioning (List Attached) IDA / 65950 Post Limited 2,239.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 required for Anuradhapura ation Teaching Hospital during Covid period. (Advance) LK-MOH-203667-GO-RFQ / 65 Nos Elbow Taps and 05 Pending Nos Large Sinks required for Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 1,132.00 0.00 Implement Anuradhapura Teaching COVID-19 Response Quotations Envelope 13 01 15 ation Hospital during Covid period. (Advance) LK-MOH-203668-GO-RFQ / 18 Items of Aluminium fittings and accessories (List Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- Attached) required for IDA / 65950 Post Limited 893.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Anuradhapura Teaching ation Hospital during Covid period. (Advance) LK-MOH-203669-GO-RFQ / 23 associated Items of Pending Electrical wiring (List Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 440.00 0.00 Implement attached) required for COVID-19 Response Quotations Envelope 13 01 15 ation Anuradhapura Teaching Hospital during Covid period.(Advance) LK-MOH-203670-GO-RFQ / 32 Items of Aluminium fittings and accessories (List Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- attached) required for IDA / 65950 Post Limited 3,326.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Anuradhapura Teaching ation Hospital during Covid period.(Advance) LK-MOH-203671-GO-RFQ / 11 Items of Hardware Pending items & fittings (List Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 208.00 0.00 Implement attached) required for COVID-19 Response Quotations Envelope 13 01 15 ation Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-203672-GO-RFQ / 16 Items of Hardware Pending items & fittings (List Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 1,691.00 0.00 Implement attached) required for COVID-19 Response Quotations Envelope 13 01 15 ation Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-203673-GO-RFQ / 52 Items of Hardware Pending items & fittings (List Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 2,992.00 0.00 Implement attached) required for COVID-19 Response Quotations Envelope 13 01 15 ation Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-203674-GO-RFQ / 09 Items of Hardware Pending items & fittings (List Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 593.00 0.00 Implement attached) required for COVID-19 Response Quotations Envelope 13 01 15 ation Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-203675-GO-RFQ / 1000 Nos Bar Soap, 1,000 Nos Hand Wash, 150 Nos Pending Surfexel (1 Kg) and 200 Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 3,105.00 0.00 Implement Nos Washing Powder (1Kg) COVID-19 Response Quotations Envelope 13 01 15 ation required for Anuradhapura Teaching Hospital during Covid period.(Advance) LK-MOH-203693-GO-RFQ / 09 Items of Hardware materials (List Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- attached)required for IDA / 65950 Post Limited 242.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 15 Anuradhapura Teaching ation Hospital during Covid period.(Advance) LK-MOH-203694-GO-RFQ / 09 items of Stationery and Pending other items (List attached) Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 216.00 0.00 Implement required for Anuradhapura COVID-19 Response Quotations Envelope 13 01 15 ation Teaching Hospital during Covid period. (Advance) LK-MOH-203696-GO-RFQ / 08 Lengths 4" PVC Pipe,15 Lengths 2"PVC Pipe, 08 Nos Pending Plan Sockets 2", 01 no 4" T- Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 473.00 0.00 Implement Sockets and 500ml Slone COVID-19 Response Quotations Envelope 13 01 15 ation Glue required for Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-203720-GO-RFQ / 5X3 Stand Board 15 Nos,12x8 Board 02 Nos, Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- 6x4 Board 3 Nos, and 1.5x2 IDA / 65950 Post Limited 1,547.00 0.00 Implement COVID-19 Response Quotations Envelope 14 02 16 Banner 14 Nos required for ation Anuradhapura Teaching Hospital during Covid period. (Advance) LK-MOH-203722-GO-RFQ / 41 Items of partitioning Pending related items (List attached) Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 2,339.00 0.00 Implement required for Anuradhapura COVID-19 Response Quotations Envelope 14 02 16 ation Teaching Hospital during Covid period. (Advance) LK-MOH-203723-GO-RFQ / 10 Items of Partitioning Pending related items (List attached) Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- IDA / 65950 Post Limited 323.00 0.00 Implement required for Anuradhapura COVID-19 Response Quotations Envelope 14 02 16 ation Teaching Hospital during Covid period. (Advance) LK-MOH-203724-GO-RFQ / 33 Items of Partitioning related materials (List Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- attached) required for IDA / 65950 Post Limited 2,908.00 0.00 Implement COVID-19 Response Quotations Envelope 14 02 16 Anuradhapura Teaching ation Hospital during Covid period. (Advance) Pending LK-MOH-203741-GO-RFQ Component 1: Emergency Request for Single Stage - One 2020-12- 2020-12- 2021-01- IDA / 65950 Post Limited 162,162.00 0.00 Implement / 1,500 Nos Patient Beds COVID-19 Response Quotations Envelope 01 27 03 ation Pending LK-MOH-203748-GO-RFQ Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- IDA / 65950 Post Limited 32,432.00 0.00 Implement / 1,500 Nos Mattresses COVID-19 Response Quotations Envelope 30 26 02 ation LK-MOH-203750-GO-RFQ Pending / 1,500 Nos Pillows, 4,500 Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- IDA / 65950 Post Limited 40,951.00 0.00 Implement Nos Pillow Cases and 4,500 COVID-19 Response Quotations Envelope 30 26 02 ation Nos Bed Sheets LK-MOH-203805-GO-RFQ / Supply and installation of Pending 3 Nos CCTV systems for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- IDA / 65950 Post Limited 9,730.00 0.00 Implement Bandarawela COVID-19 Response Quotations Envelope 05 30 29 ation ,Bogahakumbura & Uraniya Hospitals Badulla DH LK-MOH-203810-GO-RFQ / Supply of essential Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- building materials for IDA / 65950 Post Limited 1,322.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 renovation and modification ation of the hospital at Ambalangoda DH-Galle LK-MOH-203823-GO-RFQ / Supply of essential Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- building materials for IDA / 65950 Post Limited 22,703.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 renovation and modification ation of the hospital at Karandeniya DH Galle LK-MOH-203835-GO-RFQ Pending / Supply and Installation of Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- IDA / 65950 Post Limited 8,108.00 0.00 Implement CCTV system at COVID-19 Response Quotations Envelope 05 30 29 ation Vidaththalthivu Mannar DH LK-MOH-203937-GO-RFQ / Supply & Installation of 4 Nos CCTV systems for Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- Padhiyathalawa , Palamunai IDA / 65950 Post Limited 15,135.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 , Karadiyanaru , ation Eachchilampattu, Eastern Province LK-MOH-203938-GO-RFQ / Supply & Installation of 4 Nos PABX systems for Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- Padhiyathalawa , Palamunai IDA / 65950 Post Limited 19,459.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 , Karadiyanaru , ation Eachchilampattu, Eastern Province LK-MOH-203939-GO-RFQ / Supply of material for Pending Essential modification to Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- IDA / 65950 Post Limited 29,189.00 0.00 Implement establish Covid-19 ward at COVID-19 Response Quotations Envelope 05 30 29 ation DH Weligama, Sothern Province LK-MOH-203940-GO-RFQ / Essential items required Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- for renovations of MS IDA / 65950 Post Limited 10,811.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 quarters for covid + ation patients at Kamburuoitiya BH LK-MOH-203941-GO-RFQ / Supply of material for Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- Essential modification to IDA / 65950 Post Limited 21,634.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 establish Covid-19 ward at ation DH Dickwella LK-MOH-203943-GO-RFQ / Supply of material for Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- Essential modification to IDA / 65950 Post Limited 6,486.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 establish Covid-19 ward at ation DH Ambalantota LK-MOH-203950-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- / Supply of Hospital Attia IDA / 65950 Post Limited 10,812.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 for Kegalla DH ation LK-MOH-203967-GO-RFQ Pending / installation of CCTV Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- IDA / 65950 Post Limited 10,811.00 0.00 Implement system at special Isolation COVID-19 Response Quotations Envelope 05 30 29 ation unit DH A Kithulgala and Beligala LK-MOH-203970-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- / Supply and installation of IDA / 65950 Post Limited 2,703.00 0.00 Implement COVID-19 Response Quotations Envelope 05 07 21 sound system at DGH ation Ampara LK-MOH-203972-GO-RFQ Pending / Supply and Installation of Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 32,432.00 0.00 Implement Industrial Washing Machine COVID-19 Response Quotations Envelope 05 07 21 ation at Ampara DGH LK-MOH-203974-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- / Supply and Installation of IDA / 65950 Post Limited 16,216.00 0.00 Implement COVID-19 Response Quotations Envelope 05 30 29 CCTV system at Ampara ation DGH LK-MOH-203994-GO-DIR / The TONI-IV, The Wechsler Adult Intelligence Scale fourth edition, The Pending Repeatable Battery for Component 1: Emergency 2020-11- 2020-12- 2021-01- 2021-07- TF / B3017 Post Direct Selection Direct 3,233.73 0.00 Implement Neuropsychological COVID-19 Response 30 05 09 08 ation Assessment and The LOTCA and LOTCA-G tools are required by Collage of Psychiatric LK-MOH-203998-GO-DIR / The Neuropsychiatry unit Pending Component 1: Emergency 2020-11- 2020-12- 2021-01- 2021-07- Cognitive Assessment tool TF / B3017 Post Direct Selection Direct 164.95 0.00 Implement COVID-19 Response 30 05 09 08 required by Collage of ation Psychiatric Page 17 LK-MOH-204011-GO-RFQ / Development, Pending Establishment and Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- TF / B3017 Post Limited 28,541.00 0.00 Implement Maintenance of of 60 Nos COVID-19 Response Quotations Envelope 05 30 29 ation of Bill Boards in island wide required by Family Health Bureau. LK-MOH-205320-GO-RFQ / supply of building material Pending for improving Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- IDA / 65950 Post Limited 9,730.00 0.00 Implement Agunukolapalessa COVID-19 Response Quotations Envelope 05 30 29 ation agriculture school to be converted as intermediate care center LK-MOH-205331-GO-RFQ Pending / Supply and Installation of Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- IDA / 65950 Post Limited 8,108.00 0.00 Implement of Communication and COVID-19 Response Quotations Envelope 05 30 29 ation CCTV System at Buttala DH LK-MOH-205339-GO-DIR / Reagents for fully automated nucleic acid Pending extractors reagents for fully Component 1: Emergency 2020-11- 2020-12- 2021-01- 2021-07- IDA / 65950 Post Direct Selection Direct 1,297,297.00 0.00 Implement automated nucleic acid COVID-19 Response 30 05 09 08 ation extractors. Maxwell RSC x 2000 kits (228,000 Reactions) BGI x 150,000 reactions LK-MOH-205340-GO-DIR / BGI extraction kits ( the Pending requirement is 108 Boxes Component 1: Emergency 2020-11- 2020-12- 2021-01- 2021-07- IDA / 65950 Post Direct Selection Direct 594,595.00 0.00 Implement (180,000 reactions) for the COVID-19 Response 30 05 09 08 ation machine at CEBH- Mulleriyawa): LK-MOH-205341-GO-DIR Pending / Roche magNa pure 96 Component 1: Emergency 2020-11- 2020-12- 2021-01- 2021-07- IDA / 65950 Post Direct Selection Direct 583,784.00 0.00 Implement system extraction kit for BIA COVID-19 Response 30 05 09 08 ation three months requirement LK-MOH-205520-GO-RFQ / Urgently required medical equipment -digital BP Pending apparatus ,pulse oximeter , Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-07- IDA / 65950 Post Limited 140,541.00 0.00 Implement nebulizer ,ECG,IR COVID-19 Response Quotations Envelope 05 30 29 ation thermometer, CTG, Hand Held doppler for treatment center (annex 1) LK-MOH-205727-GO-RFB Pending / Urgently required medical Component 1: Emergency Single Stage - One 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- IDA / 65950 Post Request for Bids Open - National 243,243.00 0.00 Implement equipment - ICU bed and COVID-19 Response Envelope 30 05 16 15 22 18 ation HDU bed (annex 1) LK-MOH-205544-GO-RFQ Pending / 30 Nos Sawing machines Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-08- TF / B3017 Post Limited 4,865.00 0.00 Implement for Mental Health COVID-19 Response Quotations Envelope 08 02 01 ation Rehabilitation units island wide LK-MOH-205546-GO-RFQ / 02 Nos Exercise and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-08- fitness machine for Mental TF / B3017 Post Limited 1,081.00 0.00 Implement COVID-19 Response Quotations Envelope 08 02 01 Health Rehabilitation units ation island wide LK-MOH-205633-GO-RFQ Pending / Procurement of Paint Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 105,028.00 0.00 Implement Items for quarantine and COVID-19 Response Quotations Envelope 13 08 15 ation patient management centers. LK-MOH-205634-GO-RFQ Pending / Procurement of Septic Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 25,722.00 0.00 Implement Tanks for quarantine and COVID-19 Response Quotations Envelope 13 08 15 ation patient management centers LK-MOH-205635-GO-RFQ Pending / Procurement of Tools for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 21,719.00 0.00 Implement quarantine and patient COVID-19 Response Quotations Envelope 13 08 15 ation management centers LK-MOH-205636-GO-RFQ Pending / Procurement of Plywood Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 123,611.00 0.00 Implement Sheets for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205637-GO-RFQ Pending / Procurement of Yard Items Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 137,396.00 0.00 Implement for quarantine and patient COVID-19 Response Quotations Envelope 20 15 22 ation management centers LK-MOH-205638-GO-RFQ Pending / Procurement of Cement Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 97,233.00 0.00 Implement for quarantine and patient COVID-19 Response Quotations Envelope 20 15 22 ation management centers LK-MOH-205640-GO-RFQ Pending / Procurement of Tile Items Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 190,236.00 0.00 Implement for quarantine and patient COVID-19 Response Quotations Envelope 20 15 22 ation management centers LK-MOH-205642-GO-RFQ Pending / Procurement of Sanitary Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 87,095.00 0.00 Implement Fittings for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205643-GO-RFQ Pending / Procurement of Timber for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 134,311.00 0.00 Implement quarantine and patient COVID-19 Response Quotations Envelope 20 15 22 ation management centers LK-MOH-205644-GO-RFQ / Procurement of Sandwich Pending Panel Items (Zn/Al Sheets) Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 186,059.00 0.00 Implement and GI Corrugated Sheets COVID-19 Response Quotations Envelope 20 15 22 ation for quarantine and patient management centers LK-MOH-205645-GO-RFQ Pending / Procurement of Electrical Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 198,879.00 0.00 Implement Wires for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205646-GO-RFQ / Procurement of Fans & Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- Lighting Items for IDA / 65950 Post Limited 89,894.00 0.00 Implement COVID-19 Response Quotations Envelope 20 15 22 quarantine and patient ation management centers LK-MOH-205648-GO-RFQ Pending / Procurement of Electrical Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 141,277.00 0.00 Implement Items for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205649-GO-RFQ Pending / Procurement of Hardware Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 19,063.00 0.00 Implement Items for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205651-GO-RFQ Pending / Procurement of Concrete Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 49,426.00 0.00 Implement Nails for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205652-GO-RFQ Pending / Procurement of Steel items Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 142,635.00 0.00 Implement for quarantine and patient COVID-19 Response Quotations Envelope 20 15 22 ation management centers LK-MOH-205654-GO-RFQ Pending / Procurement of Aluminium Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 199,437.00 0.00 Implement Items for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205656-GO-RFQ Pending / Procurement of P.V.C. Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 181,045.00 0.00 Implement Pipes for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205657-GO-RFQ Pending / Procurement of Plumbing Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 44,065.00 0.00 Implement Items for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205658-GO-RFQ Pending / Procurement of Water Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 32,066.00 0.00 Implement Tanks for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205659-GO-RFQ Pending / Procurement of Mattress Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 107,099.00 0.00 Implement for quarantine and patient COVID-19 Response Quotations Envelope 20 15 22 ation management centers LK-MOH-205660-GO-RFQ Pending / Procurement of Sanitary Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 128,785.00 0.00 Implement Items for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205663-GO-RFQ Pending / Procurement of Furniture Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 114,476.00 0.00 Implement for quarantine and patient COVID-19 Response Quotations Envelope 20 15 22 ation management centers LK-MOH-205666-GO-RFQ / Procurement of Glass and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- Porcelain Items for IDA / 65950 Post Limited 87,168.00 0.00 Implement COVID-19 Response Quotations Envelope 20 15 22 quarantine and patient ation management centers LK-MOH-205667-GO-RFQ Pending / Procurement of Cutlery Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 20,404.00 0.00 Implement Sets for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205672-GO-RFQ Pending / Procurement of Bedding Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 172,571.00 0.00 Implement Items for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205674-GO-RFQ Pending / Procurement of Mosquito Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 44,306.00 0.00 Implement Nets for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205675-GO-RFQ / Procurement of Bed Iron Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- Single (Frames with Bases) IDA / 65950 Post Limited 162,446.00 0.00 Implement COVID-19 Response Quotations Envelope 20 15 22 for quarantine and patient ation management centers LK-MOH-205676-GO-RFQ Pending / Procurement of Spray Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 69,958.00 0.00 Implement Machines for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205677-GO-RFQ / Washing Machines, Rice Steamers, LED TV, Water Pending Boilers & Pumps, Coconut Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 159,854.00 0.00 Implement Scrappers, Weighing Scales COVID-19 Response Quotations Envelope 20 15 22 ation & other household Items) for quarantine and patient management centers LK-MOH-205678-GO-RFQ / Procurement of Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- Communication items for IDA / 65950 Post Limited 44,240.00 0.00 Implement COVID-19 Response Quotations Envelope 20 15 22 quarantine and patient ation management centers LK-MOH-205679-GO-RFQ Pending / Procurement of Kitchen Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 71,706.00 0.00 Implement items for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205680-GO-RFQ Pending / Procurement of Stationary Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 19,829.00 0.00 Implement Items for quarantine and COVID-19 Response Quotations Envelope 20 15 22 ation patient management centers LK-MOH-205681-GO-RFQ Pending / Procurement of Portable Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 40,000.00 0.00 Implement Washrooms for quarantine COVID-19 Response Quotations Envelope 20 15 22 ation and patient management centers LK-MOH-205682-GO-RFQ Pending / Procurement of Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 127,176.00 0.00 Implement Generators for quarantine COVID-19 Response Quotations Envelope 20 15 22 ation and patient management centers LK-MOH-205683-GO-RFQ / Procurement of Plastic Pending Tables, Chairs and other Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 97,513.00 0.00 Implement Items (Dust Bins, Buckets, COVID-19 Response Quotations Envelope 20 15 22 ation Cans, etc) for use of quarantine and patient management centers LK-MOH-205686-GO-RFQ / Procurement of Fire Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- Extinguishers for quarantine IDA / 65950 Post Limited 7,833.00 0.00 Implement COVID-19 Response Quotations Envelope 20 15 22 and patient management ation centers LK-MOH-205690-GO-RFQ Pending / Supply of materials for Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-01- IDA / 65950 Post Limited 2,703.00 0.00 Implement covered way at Kahagolla COVID-19 Response Quotations Envelope 20 15 22 ation Intermediate Center LK-MOH-205694-GO-RFQ / IT and Office equipment required for strengthening Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-02- COVI 19 related risk IDA / 65950 Post Limited 119,611.00 0.00 Implement COVID-19 Response Quotations Envelope 27 22 21 communication through ation HPB, District counter parts and hospitals (Annex 2) LK-MOH-205696-GO-RFQ / Furniture required for Pending strengthening COVI 19 Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-02- IDA / 65950 Post Limited 3,924.00 0.00 Implement related risk communication COVID-19 Response Quotations Envelope 27 22 21 ation through HPB, District counter parts and hospitals Annex 2 LK-MOH-205697-GO-RFQ / Stationery items required Pending for strengthening COVI 19 Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-02- IDA / 65950 Post Limited 1,870.00 0.00 Implement related risk communication COVID-19 Response Quotations Envelope 27 22 21 ation through HPB, District counter parts and hospitals Annex 2 LK-MOH-205733-GO-RFQ / Supply ,Installation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-08- Commissioning of CCTV IDA / 65950 Post Limited 11,273.00 0.00 Implement COVID-19 Response Quotations Envelope 14 08 07 system for patient ation surveillance in NIID LK-MOH-203403-GO-RFQ Pending / 08 Items of Kitchen Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- TF / B3017 Post Limited 7,622.00 0.00 Implement Equipment for Mental Heath COVID-19 Response Quotations Envelope 24 29 28 ation directorate (Grant) LK-MOH-203392-GO-RFQ / 05 Nos Guitars, 05 Nos Keyboards, 20 Nos Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- Tambourine, 20Nos Congo TF / B3017 Post Limited 2,108.00 0.00 Implement COVID-19 Response Quotations Envelope 24 29 28 and 20Nos Maraca Pairs for ation Directorate of Mental Health .(Grant) LK-MOH-203389-GO-RFQ Pending / 06 Type of Sports items Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- TF / B3017 Post Limited 6,535.00 0.00 Implement for Directorate of Mental COVID-19 Response Quotations Envelope 24 29 28 ation Health (Grant) LK-MOH-205501-GO-UN / Supply of Bio Medical Equipment, 14 Nos Automated RNA Extractors, Pending Component 1: Emergency UN Agencies 2020-12- 2021-01- 2021-02- 2021-08- Equipment for 5 Molecular IDA / 65950 Prior Direct 6,613,385.00 0.00 Implement COVID-19 Response (Direct) 28 02 06 05 Laboratories and Installation ation of Laboratory Information Management System (LIMS) through UNOP procurement LK-MOH-207175-GO-RFQ / Supply and Installation of Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-03- central air-conditioner IDA / 65950 Post Limited 48,649.00 0.00 Implement COVID-19 Response Quotations Envelope 19 30 01 system with Hepa filters for ation COVID ICU and HDU at BH Marawila LK-MOH-207182-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-03- / Supplying medical gas and IDA / 65950 Post Limited 16,217.00 0.00 Implement COVID-19 Response Quotations Envelope 19 30 01 fire extinguishes for ation Marawila BH LK-MOH-207185-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-01- 2021-03- / Supply and Installation of IDA / 65950 Post Limited 21,622.00 0.00 Implement COVID-19 Response Quotations Envelope 19 30 01 Generator set for Marawila ation BH Page 18 LK-MOH-207211-GO-RFQ / 50 Nos Hand held public Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- address systems for risk IDA / 65950 Post Limited 13,514.00 0.00 Implement COVID-19 Response Quotations Envelope 26 07 21 communication at estate ation and urban areas Pending LK-MOH-207213-GO-RFQ Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- IDA / 65950 Post Limited 70,270.00 0.00 Implement / 65 Nos Suction apparatus COVID-19 Response Quotations Envelope 27 08 22 ation LK-MOH-207585-GO-RFQ / Purchasing Two mobile toilets, one fiber glass Pending mobile shower unit and 10 Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- IDA / 65950 Post Limited 2,162.00 0.00 Implement paddle sink ,3 shower COVID-19 Response Quotations Envelope 27 08 22 ation heater with pressure pump for Warallawatta Yakkakala intermediate Covid Center LK-MOH-207586-GO-RFQ / 336 Nos Stand fan , 119 Nos Double door Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- refrigerator, 136 Nos IDA / 65950 Post Limited 183,784.00 0.00 Implement COVID-19 Response Quotations Envelope 27 08 22 Washing ation machine 10 kg , 247 Nos Electric kettles and 159 Nos Television 42" LK-MOH-207594-GO-RFQ / Procurement of telephone Pending and network cables and Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- TF / B3017 Post Limited 4,322.00 0.00 Implement accessories for COVID-19 Response Quotations Envelope 27 08 22 ation improvement and extension of 1926 Help Line LK-MOH-207596-GO-RFQ / Conference Table 01, Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- Metal Chairs 04, Office TF / B3017 Post Limited 541.00 0.00 Implement COVID-19 Response Quotations Envelope 27 08 22 cupboard 01, Filing Rack ation 01, Book Shelf  01 LK-MOH-207613-GO-RFQ / Supply , installation and Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-03- commissioning 01 Unit of IDA / 65950 Post Limited 135,135.00 0.00 Implement COVID-19 Response Quotations Envelope 27 21 23 500 KVA Diesel Generator ation for Base Hospital Marawila LK-MOH-207656-GO-RFQ / Procurement of License Pending package of  Adobe Creative Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-08- TF / B3017 Post Limited 1,622.00 0.00 Implement Suite for 03 computers for COVID-19 Response Quotations Envelope 27 21 20 ation two years for Health Promotion Bureau. LK-MOH-208776-GO-DIR Pending Component 1: Emergency 2020-12- 2020-12- 2021-01- 2021-01- / 100,000 Nos of KN 95 IDA / 65950 Post Direct Selection Direct 51,892.00 0.00 Implement COVID-19 Response 15 20 10 25 Face Masks ation LK-MOH-208778-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- / 400,000 Nos KN 95 Face IDA / 65950 Post Limited 189,190.00 0.00 Implement COVID-19 Response Quotations Envelope 20 07 22 Masks ation LK-MOH-210720-GO-RFQ / Supply of material for Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021-09- Essential modification to IDA / 65950 Post Limited 6,486.00 0.00 Implement COVID-19 Response Quotations Envelope 11 08 04 establish Covid-19 ward at ation Nilwala education center LK-MOH-210723-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021-03- / 05 Nos Laptops for MoH IDA / 65950 Post Limited 10,801.00 0.00 Implement COVID-19 Response Quotations Envelope 19 10 25 Procurement division ation LK-MOH-210725-GO-RFQ Pending / 01 No Smart Interactive Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021-03- IDA / 65950 Post Limited 5,405.00 0.00 Implement Digital Display including COVID-19 Response Quotations Envelope 19 10 25 ation Web Camera with TV Mount LK-MOH-210727-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021-03- / Supply and Installation of IDA / 65950 Post Limited 2,703.00 0.00 Implement COVID-19 Response Quotations Envelope 19 10 25 Wireless Conference System ation LK-MOH-203388-GO-RFQ / 72 items of Occupational Pending Therapy Instrument (List Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- TF / B3017 Post Limited 10,280.00 0.00 Implement attached) for Mental health COVID-19 Response Quotations Envelope 17 22 21 ation District General Hospital ,Monaragala. (Grant) LK-MOH-203385-GO-RFQ / 31 Items of Occupational Pending Therapy Instruments for Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- TF / B3017 Post Limited 8,108.00 0.00 Implement Mental Health - General COVID-19 Response Quotations Envelope 17 22 21 ation Hospital Katugasthota. (Grant). LK-MOH-212321-GO-RFQ / 06 Unit of Electro Convulsive Therapy Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021-03- machines (ECT) required for TF / B3017 Post Limited 162,162.00 0.00 Implement COVID-19 Response Quotations Envelope 17 07 22 06 Hospitals (GH Vavuniya, ation TH Anuradhapura, TH Kandy, TH Peradeniya, DGH Kegalle, GH Nuwara Eliya) LK-MOH-212322-GO-DIR Pending / 02 Nos of Freezer plants Component 1: Emergency 2021-01- 2021-01- 2021-02- 2021-02- TF / B3017 Post Direct Selection Direct 108,108.00 0.00 Implement for the Central Vaccine store COVID-19 Response 11 16 13 28 ation at the Epidemiology Unit. LK-MOH-212431-GO-RFQ / 08 Nos Executive Tables, 18 Nos 2 Seater Work Pending Stations, 20 Nos Stainless Component 1: Emergency Request for Single Stage - One 2021-01- 2021-02- 2021-02- TF / B3017 Post Limited 5,405.00 0.00 Implement Steel Dining Chairs and 02 COVID-19 Response Quotations Envelope 17 14 21 ation Nos Dining Tables required for Epidemiology Unit to strength Covid-19 Surveillance LK-MOH-212432-GO-RFQ / Supply and Installation of 07 Nos 12000 BTU Air Pending Conditioner Unit and 01 No Component 1: Emergency Request for Single Stage - One 2021-01- 2021-02- 2021-02- TF / B3017 Post Limited 4,500.00 0.00 Implement 24,000 BTU Air Conditioner COVID-19 Response Quotations Envelope 17 14 21 ation Unit for Epidemiology Unit to strength Covid-19 Surveillance. LK-MOH-212433-GO-RFQ / Supply and delivery of 14 Pending Items of Office Furniture for Component 1: Emergency Request for Single Stage - One 2021-01- 2021-02- 2021-02- TF / B3017 Post Limited 10,811.00 0.00 Implement Newly Build Infection COVID-19 Response Quotations Envelope 16 13 20 ation Prevention and Control Unit (NIMH) LK-MOH-215133-GO-RFQ / CCTV Survaillence and Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021-09- Audio Visual TF / B3017 Post Limited 10,810.00 0.00 Implement COVID-19 Response Quotations Envelope 29 26 22 Communication System for ation Mental Health Unit at NIMH LK-MOH-215136-GO-RFQ / Vidio Coference Pending Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021-09- Equipment and Accessaris TF / B3017 Post Limited 10,810.00 0.00 Implement COVID-19 Response Quotations Envelope 30 27 23 for newly build Infection and ation Control Unit at NIMH LK-MOH-215715-GO-RFQ / Harware items for the Pending Component 1: Emergency Request for Single Stage - One 2021-02- 2021-04- 2021-09- Renovation works of IDA / 65950 Post Limited 24,324.00 0.00 Implement COVID-19 Response Quotations Envelope 05 02 29 hospital building ation Norechcholai Covid Treatment Center LK-MOH-215714-GO-RFQ Pending / Electrical items required Component 1: Emergency Request for Single Stage - One 2021-02- 2021-04- 2021-09- IDA / 65950 Post Limited 8,108.00 0.00 Implement for the renovation work at COVID-19 Response Quotations Envelope 05 02 29 ation Norichcholai Treatment Center LK-MOH-215719-GO-RFQ / Supply, Installation and commissioning of Pending Component 1: Emergency Request for Single Stage - One 2021-02- 2021-04- 2021-09- Telecommunication and IDA / 65950 Post Limited 8,108.00 0.00 Implement COVID-19 Response Quotations Envelope 05 02 29 Video Survailiance facilities ation at Udagama, Atabage Covid treatment Center LK-MOH-215723-GO-RFQ / Hardware items required Pending Component 1: Emergency Request for Single Stage - One 2021-02- 2021-03- 2021-03- for construction of IDA / 65950 Post Limited 48,650.00 0.00 Implement COVID-19 Response Quotations Envelope 05 03 10 temporary wards for Covid ation treatment at Colombo East Base Hospital LK-MOH-215728-GO-RFQ / Procurement of Aluminium fittings and Accessaries Pending Component 1: Emergency Request for Single Stage - One 2021-02- 2021-03- 2021-03- required for construction of IDA / 65950 Post Limited 27,030.00 0.00 Implement COVID-19 Response Quotations Envelope 05 03 10 temporary wards for Covid ation treatment at Colombo East Base Hospital LK-MOH-215732-GO-RFQ / Procurement of Yard Items Pending required for construction of Component 1: Emergency Request for Single Stage - One 2021-02- 2021-03- 2021-03- IDA / 65950 Post Limited 32,432.00 0.00 Implement temporary wards for Covid COVID-19 Response Quotations Envelope 05 03 10 ation treatment at Colombo East Base Hospital LK-MOH-215737-GO-RFQ / Procurement of PVC and Pending Wiring Accessaries required Component 1: Emergency Request for Single Stage - One 2021-02- 2021-03- 2021-03- IDA / 65950 Post Limited 27,030.00 0.00 Implement for construction of COVID-19 Response Quotations Envelope 05 03 10 ation temporary wards for Covid treatment at Colombo East Base Hospital LK-MOH-215766-GO-RFB / Supply ,Installation and commissioning of 03 Nos Pending Component 1: Emergency Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- walk in cold storage IDA / 65950 Post Request for Bids Open - National 32,450.00 0.00 Implement COVID-19 Response Envelope 08 13 27 26 31 27 facilities at centarl ation vaccination store , Badulla RMSD & , Rathnapura RMSD LK-MOH-219224-GO-RFB Under Component 1: Emergency Open - Single Stage - One 2021-02- 2021-02- 2021-02- 2021-04- 2021-03- 2021-04- 2021-06- 2021-12- / 60 Nos Unused IDA / 65950 Post Request for Bids 4,736,842.00 0.00 Implement COVID-19 Response International Envelope 12 12 17 05 31 30 04 01 Ambulances ation LK-MOH-201484-GO-RFB Component 1: Emergency Open - Single Stage - One 2020-12- 2020-12- 2021-02- 2021-03- 2021-04- 2021-10- IDA / 65950 Prior Request for Bids 3,846,154.00 0.00 Canceled / 60 Units of Ambulances COVID-19 Response International Envelope 22 27 07 09 13 10 LK-MOH-212440-GO-RFQ / Supply and delivery of essential Building Materials Pending to convert Ward 01 to a Component 1: Emergency Request for Single Stage - One 2021-01- 2021-03- 2021-05- IDA / 65950 Post Limited 54,054.00 0.00 Implement Step Down Covid Treatment COVID-19 Response Quotations Envelope 25 15 14 ation Center and modification to high dependency unit of TH Rathnapura. LK-MOH-224018-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-05- 2021-11- / IT equipment for covid IDA / 65950 Post Limited 4,250.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 26 PCR lab at NIHS ation LK-MOH-224030-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-05- 2021-11- / Furniture for covid PCR IDA / 65950 Post Limited 6,350.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 26 lab at NIHS ation LK-MOH-224033-GO-RFQ / Supply & Installation of AC Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-05- 2021-11- system for the new ICU IDA / 65950 Post Limited 42,150.00 0.00 Implement COVID-19 Response Quotations Envelope 05 31 27 being built near ward 17 (LK- ation MOH-207206-CW-RFQ) LK-MOH-224034-GO-RFQ / supply , installation and Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-05- 2021-11- commissioning of RO plant IDA / 65950 Post Limited 19,000.00 0.00 Implement COVID-19 Response Quotations Envelope 05 31 27 in the dialisys unit at ation Minuwangoda Base Hospital LK-MOH-224037-GO-RFQ / supply and installation of Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-05- 2021-11- hospital furniture, bedding IDA / 65950 Post Limited 68,500.00 0.00 Implement COVID-19 Response Quotations Envelope 05 31 27 itemsand non medical ation equipment to ICU LK-MOH-224045-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021-12- / Medical equipment for 10 IDA / 65950 Post Limited 52,650.00 0.00 Implement COVID-19 Response Quotations Envelope 13 08 05 bedded ICU ation LK-MOH-224242-GO-RFQ / Supply installation and Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021-12- commissioning of essential IDA / 65950 Post Limited 26,400.00 0.00 Implement COVID-19 Response Quotations Envelope 14 09 06 medical equipment for 3 ation beded HDU LK-MOH-224245-GO-RFQ Pending / supply , installation and Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021-12- IDA / 65950 Post Limited 18,500.00 0.00 Implement commissioning of mortuary COVID-19 Response Quotations Envelope 13 08 05 ation cooler with 4 chambers LK-MOH-224247-GO-RFQ / Extention of Central AC Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021-12- system to vnewly built IDA / 65950 Post Limited 37,000.00 0.00 Implement COVID-19 Response Quotations Envelope 14 09 06 medical intensive care unit ation located in different floor LK-MOH-224249-GO-RFQ / supply installation and commissing of washer Pending extractor , dryer tumbler Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021-12- IDA / 65950 Post Limited 168,500.00 0.00 Implement and disinfection machine. COVID-19 Response Quotations Envelope 25 20 17 ation And double door high pressure sterilizer in level 3 covid treatment center Pending LK-MOH-224250-GO-DIR Component 1: Emergency 2021-03- 2021-04- 2021-05- 2021-11- IDA / 65950 Post Direct Selection Direct 2,560.00 0.00 Implement / Supply of Dosimeter COVID-19 Response 29 03 08 04 ation LK-MOH-224252-GO-RFQ / Supply ,Installation and Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021-12- commissioning of Liquied IDA / 65950 Post Limited 23,700.00 0.00 Implement COVID-19 Response Quotations Envelope 24 19 16 Oxygen plant at TH ation Theldeniya LK-MOH-207216-GO-RFQ / Supply of consumables , lab equipment and lab test facilities-Vitamin D deficiency in adults: Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- IDA / 65950 Post Limited 32,432.00 0.00 Canceled Prevalence, risk factors and COVID-19 Response Quotations Envelope 26 07 21 its association with COVID- 19 among residents in the district of Colombo- annex 3 budget and annex 4 proposal LK-MOH-224676-GO-RFQ / Supply, Installation and commissioning of Air Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021-12- Conditioning Plants (18000 IDA / 65950 Post Limited 8,000.00 0.00 Implement COVID-19 Response Quotations Envelope 12 07 04 BTU -03 Nos & 12000 BTU - ation 07 Nos) for Health Promotion Bureau. LK-MOH-227595-GO-DIR Pending / Suplly Installation and Component 1: Emergency 2021-04- 2021-05- 2021-06- 2021-12- IDA / 65950 Post Direct Selection Direct 6,500.00 0.00 Implement Commissioning of medical COVID-19 Response 26 01 05 02 ation gas / oxygen to HDU LK-MOH-227607-GO-RFQ / Purchase of material required for partioning the Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-06- 2021-12- cuibicale to be convereted IDA / 65950 Post Limited 15,800.00 0.00 Implement COVID-19 Response Quotations Envelope 01 26 23 in to a safe 6 bedded HDU ation with direct monitoring , anteroom and doffing room LK-MOH-231325-GO-RFQ / Supply, installation, Testing and commissioning Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- of piped medical gas IDA / 65950 Post Limited 8,300.00 0.00 Implement COVID-19 Response Quotations Envelope 10 05 01 distribution system to the ation ward no 6A, 7A and 7B of National Infectious Disease Hospital LK-MOH-199415-GO-RFQ / Supply and Installation of Tables and Adjustable Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-11- TF / B3017 Post Limited 4,211.00 0.00 Canceled chairs for Audio Visual COVID-19 Response Quotations Envelope 26 16 23 Recording Studio at Health Promotion Bureau. LK-MOH-231681-GO-RFB Pending / Procurement of Viral Component 1: Emergency 2021-05- 2021-05- 2021-06- 2021-12- IDA / 65950 Post Direct Selection Direct 276,000.00 0.00 Implement Transport Media and SWABS COVID-19 Response 05 10 14 11 ation - 300,000 Nos LK-MOH-232303-GO-RFQ Pending / 8,000 Nos Pillows, 16,000 Component 1: Emergency Request for Single Stage - One 2021-05- 2021-06- 2021-06- IDA / 65950 Post Limited 181,000.00 0.00 Implement Pillow Cases - White and COVID-19 Response Quotations Envelope 11 06 13 ation 16,000 Bed Sheets - White Pending LK-MOH-232305-GO-RFQ Component 1: Emergency Request for Single Stage - One 2021-05- 2021-06- 2021-06- IDA / 65950 Post Limited 180,000.00 0.00 Implement / 8,000 Nos Mattresses COVID-19 Response Quotations Envelope 11 06 13 ation LK-MOH-232307-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-06- 2021-06- / 8,000 Nos Mosquito Nets IDA / 65950 Post Limited 27,350.00 0.00 Implement COVID-19 Response Quotations Envelope 11 06 13 (Single) ation Page 19 Pending LK-MOH-232309-GO-RFQ Component 1: Emergency Request for Single Stage - One 2021-05- 2021-06- 2021-06- IDA / 65950 Post Limited 130,000.00 0.00 Implement / 8,000 Nos Plywood Sheets COVID-19 Response Quotations Envelope 11 06 13 ation LK-MOH-233638-GO-RFQ / Extention of piped Medical Pending Gas distribution system to Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- IDA / 65950 Post Limited 21,000.00 0.00 Implement Ward 7, 8, and 9 of COVID-19 Response Quotations Envelope 25 20 16 ation Colombo nEast Base Hospital, Mulleriyawa LK-MOH-233616-GO-RFQ / 1,000Units of Automated Digital Blood Presure Pending Measurement Device and Component 1: Emergency Request for Single Stage - One 2021-06- 2021-07- 2022-01- IDA / 65950 Post Limited 40,000.00 0.00 Implement 200 Units of Glucometers COVID-19 Response Quotations Envelope 01 27 23 ation with 200,000 Test Strips to improve self-testing facilities at Hospitals LK-MOH-234317-GO-DIR Pending / 27,000 Roach Magna pure Component 1: Emergency 2021-05- 2021-05- 2021-06- 2021-12- IDA / 65950 Post Direct Selection Direct 254,000.00 0.00 Implement 96 system automated COVID-19 Response 20 25 29 26 ation extraction kits with consumabels LK-MOH-234316-GO-DIR / 58500 numbers of Pending Component 1: Emergency 2021-05- 2021-05- 2021-07- 2022-01- Pentabase magnetic bead IDA / 65950 Post Direct Selection Direct 1,500,000.00 0.00 Implement COVID-19 Response 26 31 05 01 RNA extraction kit for ation basepurified with consumabales LK-MOH-234319-GO-DIR / 121500 numbers of Pending Component 1: Emergency 2021-05- 2021-05- 2021-07- 2022-01- Nucleic acid extraction kits IDA / 65950 Post Direct Selection Direct 840,000.00 0.00 Implement COVID-19 Response 26 31 05 01 for Maxwell RSC Automated ation with consumables LK-MOH-234321-GO-DIR / 54000 number of Pending Component 1: Emergency 2021-05- 2021-05- 2021-07- 2022-01- QIASymphony extraction IDA / 65950 Post Direct Selection Direct 600,000.00 0.00 Implement COVID-19 Response 26 31 05 01 mini kits QIASymphony SP ation with consumables LK-MOH-234330-GO-RFQ / 135000 numbers of Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- Eppendorf Automated IDA / 65950 Post Limited 700,000.00 0.00 Implement COVID-19 Response Quotations Envelope 31 26 22 extraction kits for ation ependrofautomated machine with consumabels LK-MOH-234343-GO-RFB Pending / 300000 numbers of SARS Component 1: Emergency Open - Single Stage - One 2021-05- 2021-05- 2021-07- 2021-08- 2021-09- 2022-03- IDA / 65950 Post Request for Bids 1,800,000.00 0.00 Implement Cov-2 rapid Ag assay (ICT COVID-19 Response International Envelope 26 31 12 11 15 14 ation /Lateral flow method) LK-MOH-234344-GO-RFB Pending Component 1: Emergency Open - Single Stage - One 2021-05- 2021-05- 2021-07- 2021-08- 2021-09- 2022-03- / 750000 numbers of IDA / 65950 Prior Request for Bids 7,700,000.00 0.00 Implement COVID-19 Response International Envelope 26 31 12 11 15 14 COVID -19 PCR test kit ation LK-MOH-234348-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- / 1000 Nos of Jumbo IDA / 65950 Post Limited 198,000.00 0.00 Implement COVID-19 Response Quotations Envelope 31 26 22 Cylinders empty for Oxygen ation (6800Lts) Pending LK-MOH-234349-GO-RFQ Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- IDA / 65950 Post Limited 154,000.00 0.00 Implement / 15,000 nos of PPE Kits COVID-19 Response Quotations Envelope 29 24 20 ation LK-MOH-234352-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- / 50,000 nos of Goggles for IDA / 65950 Post Limited 178,000.00 0.00 Implement COVID-19 Response Quotations Envelope 29 24 20 health staff ation LK-MOH-234353-GO-RFQ Pending / 3,000,000 nos of Surgical Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- IDA / 65950 Post Limited 174,000.00 0.00 Implement Face Mask ( non streile ear COVID-19 Response Quotations Envelope 29 24 20 ation loop type) LK-MOH-234356-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- / 50,000 nos of Face Sheild IDA / 65950 Post Limited 50,000.00 0.00 Implement COVID-19 Response Quotations Envelope 29 24 20 for health staff ation LK-MOH-234357-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- / 16,000,000 nos of IDA / 65950 Post Limited 173,000.00 0.00 Implement COVID-19 Response Quotations Envelope 29 24 20 Surgical Hair Cap ation LK-MOH-234358-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- / 75000 nos of Isolation IDA / 65950 Post Limited 170,000.00 0.00 Implement COVID-19 Response Quotations Envelope 29 24 20 Gown ation LK-MOH-234360-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- / 100,000 nos of Particular IDA / 65950 Post Limited 176,000.00 0.00 Implement COVID-19 Response Quotations Envelope 29 24 20 Respirator ation LK-MOH-234362-GO-RFQ Pending / 3,000,000 nos of Surgical Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- IDA / 65950 Post Limited 150,000.00 0.00 Implement Face Mask , Tie , on type , 3 COVID-19 Response Quotations Envelope 29 24 20 ation ply LK-MOH-234363-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- / 70,000 nos of Protective IDA / 65950 Post Limited 163,000.00 0.00 Implement COVID-19 Response Quotations Envelope 29 24 20 Coverall ation LK-MOH-234364-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- / 150,000 nos of Boot IDA / 65950 Post Limited 103,000.00 0.00 Implement COVID-19 Response Quotations Envelope 29 24 20 covers ation Pending LK-MOH-234366-GO-RFQ Component 1: Emergency Request for Single Stage - One 2021-05- 2021-07- 2022-01- IDA / 65950 Post Limited 108,000.00 0.00 Implement / 5000 Nos of Body Bags COVID-19 Response Quotations Envelope 29 24 20 ation LK-MOH-234827-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-07- 2022-01- / 6,000,000.00 Nos of IDA / 65950 Post Limited 104,000.00 0.00 Implement COVID-19 Response Quotations Envelope 05 31 27 Surgical Hair Caps ation LK-MOH-234830-GO-RFB Pending Component 1: Emergency Single Stage - One 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- / 375,000 Nos of Isolation IDA / 65950 Post Request for Bids Open - National 840,000.00 0.00 Implement COVID-19 Response Envelope 31 05 17 16 20 19 Gowns ation LK-MOH-234833-GO-RFB Pending Component 1: Emergency Single Stage - One 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- / 100,000 Nos of Particular IDA / 65950 Post Request for Bids Open - National 616,000.00 0.00 Implement COVID-19 Response Envelope 31 05 17 16 20 19 Respirators (KN 95) ation LK-MOH-234835-GO-RFB Pending Component 1: Emergency Single Stage - One 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- / 19,000,000 Nos of IDA / 65950 Post Request for Bids Open - National 926,000.00 0.00 Implement COVID-19 Response Envelope 31 05 17 16 20 19 Surgical Face Masks, Tie on ation type 3 ply LK-MOH-234836-GO-RFB Pending Component 1: Emergency Single Stage - One 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- / 200,000 Nos of Protective IDA / 65950 Post Request for Bids Open - National 464,000.00 0.00 Implement COVID-19 Response Envelope 31 05 17 16 20 19 Coveralls ation LK-MOH-234838-GO-RFB Pending Component 1: Emergency Single Stage - One 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- / 5,000 Nos of Jumbo IDA / 65950 Post Request for Bids Open - National 987,000.00 0.00 Implement COVID-19 Response Envelope 31 05 17 16 20 19 Cylinder 6,800 Ltrs New ation (Empty) for O2 LK-MOH-234839-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-07- 2022-01- / 2,700,000 Nos of Micro IDA / 65950 Post Limited 60,000.00 0.00 Implement COVID-19 Response Quotations Envelope 05 31 27 Centrifuge Tubes 1.5ml ation LK-MOH-234843-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-07- 2022-01- / 1,350 Nos of PCR Tubes IDA / 65950 Post Limited 64,000.00 0.00 Implement COVID-19 Response Quotations Envelope 05 31 27 Optical grade 0.2ml ation LK-MOH-234844-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-07- 2022-01- / 900,000 Nos of 20 MIC 1 IDA / 65950 Post Limited 48,000.00 0.00 Implement COVID-19 Response Quotations Envelope 05 31 27 Filter Tips for PCR testing ation LK-MOH-234845-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-07- 2022-01- / 900,000 Nos of 10 MIC 1 IDA / 65950 Post Limited 48,000.00 0.00 Implement COVID-19 Response Quotations Envelope 05 31 27 Filter Tips ation LK-MOH-234946-GO-RFQ / Procurement of 5 nos Wheel chair ,4 Nos Patient Trolley- Stainless steel , 4 Pending NosPatient Trolley- Powder Component 1: Emergency Request for Single Stage - One 2021-06- 2021-07- 2022-01- IDA / 65950 Post Limited 19,000.00 0.00 Implement coated , 10 Nos Saline COVID-19 Response Quotations Envelope 05 31 27 ation Stand , 4 Nos Drugs Trolley & 160 Nos Bed Side Lockers to special Covid Treatment Center @ CEBH Mulleriyawa LK-MOH-235147-GO-DIR Pending / 14 Varieties of Reagents Component 1: Emergency 2021-05- 2021-06- 2021-07- 2022-01- IDA / 65950 Post Direct Selection Direct 240,000.00 0.00 Implement required for Genetic COVID-19 Response 31 05 10 06 ation sequencing. LK-MOH-235149-GO-DIR Pending Component 1: Emergency 2021-05- 2021-06- 2021-07- 2022-01- / 04 Nos of Qiagen RNA IDA / 65950 Post Direct Selection Direct 5,130.00 0.00 Implement COVID-19 Response 31 05 10 06 extraction kits250 reactions ation LK-MOH-235150-GO-DIR / Taqpath PCR kits (1000 reactions) 1, MicroAmp™ Pending Optical 96-Well Reaction Component 1: Emergency 2021-05- 2021-06- 2021-07- 2022-01- IDA / 65950 Post Direct Selection Direct 21,300.00 0.00 Implement Plate,10 plates/pack 10, COVID-19 Response 31 05 10 06 ation MicroAmp™ Optical Adhesive Film, 25 Covers/pack 10, ELISA sealers (100/pack) 2 LK-MOH-236932-GO-RFQ Pending / 02 Nos of Rice Steamer Component 1: Emergency Request for Single Stage - One 2021-06- 2021-08- 2022-02- IDA / 65950 Post Limited 7,900.00 0.00 Implement 50Kg and 50 Nos of Water COVID-19 Response Quotations Envelope 21 16 12 ation Boiler 20Ltr Automatic LK-MOH-236934-GO-RFQ / 250 Nos of Bed Side Lockers, 150 Nos of Over Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-08- 2022-02- Head Table ,25 Nos of IDA / 65950 Post Limited 35,800.00 0.00 Implement COVID-19 Response Quotations Envelope 20 15 11 Mdf Table 4*3, 25 Nos of ation MDF Almairah 6*3, 10 Nos of Portable Sound Systems LK-MOH-236936-GO-RFQ Pending / 40 Nos of Oxygen Stand Component 1: Emergency Request for Single Stage - One 2021-06- 2021-08- 2022-02- IDA / 65950 Post Limited 13,700.00 0.00 Implement Jumbo and 50 Nos of COVID-19 Response Quotations Envelope 20 15 11 ation Oxygen Stand Normal LK-MOH-236937-GO-RFQ / 15,000 Nos of Bed sheet Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-08- 2022-02- 6*4, 3,000 Nos of Pillow IDA / 65950 Post Limited 57,700.00 0.00 Implement COVID-19 Response Quotations Envelope 20 15 11 cases and 100 Nos of ation Double layer Mattress 6*3 LK-MOH-236981-GO-DIR / 20 mic 1 Filter Tips,10 mic 1 Filter Tips, 200 mic 1 Filter Tips, 1000 mic 1 Filter Pending Component 1: Emergency 2021-06- 2021-06- 2021-07- 2022-01- Tips, PCR Tubes Optical IDA / 65950 Post Direct Selection Direct 1,250,000.00 0.00 Implement COVID-19 Response 16 21 26 22 Grade 0.1 ml, Individual PCR ation Tubes Optical Grade, Flat shaped lids , 0.2 ml and Disposable plastic Pasteur pippete , 3ml LK-MOH-236962-GO-RFQ / 04 Nos of Desk Top Computers, 01 No of Laptop Computer, 01 No of Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-08- 2022-02- Photocopy Machine, 02 Nos IDA / 65950 Post Limited 7,600.00 0.00 Implement COVID-19 Response Quotations Envelope 27 22 18 Flat bed Scaners, 02 Nos of ation Laser Jet Printers (Black & White) and01 No of Laser Jet Colour Printer. LK-MOH-236966-GO-RFQ / 01 No of High Back Executive Chair-High Back, Pending 1 No of Executive Office Component 1: Emergency Request for Single Stage - One 2021-06- 2021-08- 2022-02- IDA / 65950 Post Limited 4,310.00 0.00 Implement Table, 04 Nos of Typist COVID-19 Response Quotations Envelope 28 23 19 ation Chair with Arms, 12 Nos Visiters Chair with Arms, 05 Nos of Work Stations and 02 Nos of Office Wall Racks LK-MOH-236968-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-08- 2022-02- / 01 Unit Air Conditioner IDA / 65950 Post Limited 1,025.00 0.00 Implement COVID-19 Response Quotations Envelope 28 23 19 Unit - 18,000 BTU ation LK-MOH-236978-GO-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-06- 2021-08- 2021-08- / 50 Nos of Industrial IDA / 65950 Post Limited 26,000.00 0.00 Implement COVID-19 Response Quotations Envelope 29 17 31 Washing Machines ation LK-MOH-236982-GO-DIR Pending / 150,000 Nos of Nuclic- Component 1: Emergency 2021-06- 2021-06- 2021-07- 2022-01- IDA / 65950 Post Direct Selection Direct 990,000.00 0.00 Implement Acid Extraction Kits (Viral COVID-19 Response 15 20 25 21 ation DNA/RNA Isolation Kits) LK-MOH-234339-GO-RFB Component 1: Emergency Single Stage - One 2021-05- 2021-05- 2021-07- 2021-08- 2021-09- 2022-03- / 150000 numbers of IDA / 65950 Post Request for Bids Open - National 990,000.00 0.00 Canceled COVID-19 Response Envelope 26 31 12 11 15 14 Nucleic Acid Extraction Kits (Mannual) Pending LK-MOH-237143-GO-RFB Component 1: Emergency Single Stage - One 2021-06- 2021-06- 2021-08- 2021-09- 2021-10- 2022-04- IDA / 65950 Prior Request for Bids Open - National 4,600,000.00 0.00 Implement / 450,000 Nos of PPE Kits COVID-19 Response Envelope 24 29 10 09 14 12 ation NON CONSULTING SERVICES Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual LK-MOH-171564-NC-RFB / Produce mass media Pending Component 1: Emergency Single Stage - One 2020-05- 2020-05- 2020-06- 2020-06- 2020-07- 2021-01- commercials and media IBRD / 90850 Post Request for Bids Open - National 1,200,000.00 0.00 Implement COVID-19 Response Envelope 13 18 01 08 13 09 time purchase in selected ation media channels in Sri-Lanka LK-MOH-171868-NC-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- / Supplying and Installation IBRD / 90850 Post Limited 2,595.00 0.00 Implement COVID-19 Response Quotations Envelope 02 21 04 of Electrical Panels ation LK-MOH-171740-NC-DIR / Pending Component 1: Emergency 2020-05- 2020-06- 2020-06- 2020-07- Supplying and Installation of IBRD / 90850 Post Direct Selection Direct 27,632.00 0.00 Implement COVID-19 Response 28 02 30 14 Oxygen System ation LK-MOH-171741-NC-RFQ Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- / Hire of Tools IBRD / 90850 Post Limited 5,263.00 0.00 Implement COVID-19 Response Quotations Envelope 25 13 27 refurbishment work ation LK-MOH-172685-GO-RFQ / Prepared Changing Rooms,wash rooms and Pending Component 1: Emergency Request for Single Stage - One 2020-05- 2020-07- 2020-07- store rooms using IDA / 65950 Post Limited 15,105.00 0.00 Implement COVID-19 Response Quotations Envelope 13 01 22 containers at IDH procured ation by MoH Development unit during Covid 19 period. Pending LK-MOH-171736-NC-DIR / Component 1: Emergency Request for Single Stage - One 2020-06- 2020-07- 2020-08- IBRD / 90850 Post Limited 12,421.00 0.00 Implement Waterproofing work COVID-19 Response Quotations Envelope 02 21 04 ation LK-MOH-188661-NC-DIR / Pending Sewing of 135 Nos Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 197.00 0.00 Implement Polythene Aprons at COVID-19 Response 13 18 01 15 ation Ragama Teaching Hospital during Covid period LK-MOH-188850-NC-DIR / Pending Sawing 325 Nos Corona Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 197.00 0.00 Implement Apron required for Ragama COVID-19 Response 14 19 02 16 ation Teaching Hospital during Covid period LK-MOH-188865-NC-DIR / Pending Hire of Labour obtained by Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 211.00 0.00 Implement Ragama Teaching Hospital COVID-19 Response 14 19 02 16 ation during Covid period LK-MOH-188881-NC-DIR / Pending Sewing of 540 Nos corona Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 142.00 0.00 Implement apron for Ragama Teaching COVID-19 Response 14 19 02 16 ation Hospital during Covid period LK-MOH-188967-NC-DIR / Installation of power outlet Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- service obtained by Ragama IDA / 65950 Post Direct Selection Direct 16.00 0.00 Implement COVID-19 Response 16 21 04 18 Teaching Hospital during ation Covid period LK-MOH-188968-NC-DIR / Sewing of 390 Nos Corona Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Aprons obtained by Ragama IDA / 65950 Post Direct Selection Direct 103.00 0.00 Implement COVID-19 Response 16 21 04 18 Teaching Hospital during ation Covid period LK-MOH-188979-NC-DIR / Pending Sewing of 800 Nos Coron Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 211.00 0.00 Implement Aprons for Ragama COVID-19 Response 16 21 04 18 ation Teaching Hospital during Covid period LK-MOH-188980-NC-DIR / Pending Sewing of 450 Nos Coron Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 118.00 0.00 Implement Aprons for Ragama COVID-19 Response 16 21 04 18 ation Teaching Hospital during Covid period LK-MOH-188988-NC-DIR / Pending Sewing of 730 Nos Corona Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 192.00 0.00 Implement Aprons for Ragama COVID-19 Response 16 21 04 18 ation Teaching Hospital during Covid period. Page 20 LK-MOH-188993-NC-DIR / Pending Repair of sewing Machine at Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 24.00 0.00 Implement Ragama Teaching Hospital COVID-19 Response 16 21 04 18 ation during Covid period LK-MOH-189018-NC-DIR / For sawing 1000 Nos Pending Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- Polythene Apron for Ragama IDA / 65950 Post Direct Selection Direct 263.00 0.00 Implement COVID-19 Response 16 21 04 18 Teaching Hospital during ation Covid period. LK-MOH-189019-NC-DIR / Pending Sawing 897 Nos Polythine Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 174.00 0.00 Implement Apron for Ragama Teaching COVID-19 Response 16 21 04 18 ation Hospital during Covid period. LK-MOH-189020-NC-DIR / Pending Repair of sewing machine at Component 1: Emergency 2020-08- 2020-08- 2020-09- 2020-09- IDA / 65950 Post Direct Selection Direct 13.00 0.00 Implement Ragama Teaching Hospital COVID-19 Response 16 21 04 18 ation during Covid period LK-MOH-190365-CW-RFQ / Installation of a Pedal Sink Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- in front of Ward 33 (Lama IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 13 Piyasa) at Ragama Teaching ation Hospital during Covid period. LK-MOH-190395-NC-RFQ / Installing a new door to Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- the toilet at Ward 06 at IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Ragama Teaching Hospital ation during Covid period. LK-MOH-190397-NC-RFQ / Installation of a new sink Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- for the ward 23 clinic at IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Ragama Teaching Hospital ation during Covid period. LK-MOH-190398-NC-RFQ / Installation of a new sink Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- for the ward 23 clinic at IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Ragama Teaching Hospital ation during Covid period. LK-MOH-190399-NC-RFQ / Fixing Rubber beading tape for the doors at the Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- entrance of the medical IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 intensive care unit Anti- ation room and Anti-room area at Ragama Teaching Hospital during Covid period. LK-MOH-190401-NC-RFQ / Fixing Rubber beading tape for the doors at the Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- entrance of the medical IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 intensive care unit Anti- ation room and Anti-room area at Ragama Teaching Hospital during Covid period. LK-MOH-190402-NC-RFQ / Fixing Rubber beading tape for the doors at the Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- entrance of the medical IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 intensive care unit Anti- ation room and Anti-room area at Ragama Teaching Hospital during Covid period. LK-MOH-190403-NC-RFQ / Installation of new sink & Pending Component 1: Emergency Request for Single Stage - One 2020-08- 2020-10- 2020-10- tap for Ward 26 at Ragama IDA / 65950 Post Limited 263.00 0.00 Implement COVID-19 Response Quotations Envelope 31 12 26 Teaching Hospital during ation Covid period. LK-MOH-190955-NC-DIR / Central AC – Repair and Fix Pending Component 1: Emergency 2020-08- 2020-09- 2020-09- 2020-10- at Anuradhapura Teaching IDA / 65950 Post Direct Selection Direct 30,224.00 0.00 Implement COVID-19 Response 28 02 16 16 Hospital G during Covid ation period. LK-MOH-192657-NC-RFQ / Production of Feature film of 20-30 minutes, to Pending improve the community Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-12- TF / B3017 Post Limited 13,158.00 0.00 Implement awareness on importance of COVID-19 Response Quotations Envelope 05 23 23 ation healthy relationships for a happy family for Family Health Bureau under Covid Grant LK-MOH-192658-NC-RFQ / Production of Sinhala and Tamil versions of an electronic media message of 30 seconds duration, to Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-12- improve the community TF / B3017 Post Limited 5,263.00 0.00 Implement COVID-19 Response Quotations Envelope 05 23 23 awareness on available ation health sector services for the survivors of Gender –based Violence for Family Health Bureau under Covid Grant. LK-MOH-192659-NC-RFQ / Production of Sinhala and Tamil versions of an electronic media message of 30 seconds duration, to Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-12- improve the community TF / B3017 Post Limited 5,263.00 0.00 Implement COVID-19 Response Quotations Envelope 05 23 23 awareness on Preconception ation care programme as a mode of primordial prevention of Gender-Base Violence For Family Health Bureau under Co LK-MOH-192660-NC-RFQ / Telecasting of produced Pending Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-12- feature film in television TF / B3017 Post Limited 5,263.00 0.00 Implement COVID-19 Response Quotations Envelope 05 23 23 networks for Family Health ation Bureau under Covid Grant LK-MOH-192662-NC-RFQ / Publicizing produced Pending electronic media messages Component 1: Emergency Request for Single Stage - One 2020-10- 2020-11- 2020-12- TF / B3017 Post Limited 148,267.00 0.00 Implement in television networks for COVID-19 Response Quotations Envelope 05 23 23 ation Family Health Bureau under Covid Grant LK-MOH-201168-NC-RFQ / To carry out soil Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- investigation of the IDA / 65950 Post Limited 11,358.00 0.00 Implement COVID-19 Response Quotations Envelope 09 21 04 construction site for ation proposed Isolation Centre at IDH. LK-MOH-201652-NC-RFQ Pending / Intercom System and Data Component 1: Emergency Request for Single Stage - One 2020-11- 2020-12- 2021-01- IDA / 65950 Post Limited 3,846.00 0.00 Implement cabling at the new COVID-19 Response Quotations Envelope 17 20 19 ation infections disease hospital in Kilinochchi LK-MOH-203419-NC-RFQ / Production of 05 Items of Information, Educational Pending and Communication Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-07- TF / B3017 Post Limited 40,778.00 0.00 Implement Materials (Light Boxes, COVID-19 Response Quotations Envelope 24 19 18 ation Pennants, Wall Charts, Stickers and Video Clips ) for Mental Health Directorate. (Grant) LK-MOH-203426-NC-DIR / Mental Health promotion Pending among under privileged Component 1: Emergency 2020-11- 2020-11- 2020-12- 2021-01- TF / B3017 Post Direct Selection Direct 3,555.00 0.00 Implement children in Three Districts COVID-19 Response 19 24 08 07 ation through the active utilization of Drama Therapy. (Grant) LK-MOH-203444-NC-RFQ / Display Time on LED Pending Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- Screens to display videos on TF / B3017 Post Limited 32,432.00 0.00 Implement COVID-19 Response Quotations Envelope 24 05 19 current health issues and ation public health emergencies. (Grant) LK-MOH-203469-NC-RFQ Pending / Development of six Component 1: Emergency Request for Single Stage - One 2020-11- 2021-01- 2021-01- TF / B3017 Post Limited 13,514.00 0.00 Implement graphic animation video for COVID-19 Response Quotations Envelope 24 05 19 ation Health Promotion Bureau. (Grant) LK-MOH-203725-NC-DIR / Face Book and Instagram Pending social media platform Component 1: Emergency 2020-11- 2020-12- 2021-01- 2022-12- TF / B3017 Post Direct Selection Direct 48,649.00 0.00 Implement service for the period of two COVID-19 Response 26 01 05 26 ation years required by Health Promotion Bureau (Grant) LK-MOH-205700-NC-DIR / Pending Airing video communication Component 1: Emergency 2020-12- 2020-12- 2021-01- 2021-02- IDA / 65950 Post Direct Selection Direct 54,055.00 0.00 Implement to mitigate stigma attached COVID-19 Response 02 07 11 10 ation to COVID LK-MOH-205701-NC-RFQ / Airing video Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-03- communication to mitigate IDA / 65950 Post Limited 195,000.00 0.00 Implement COVID-19 Response Quotations Envelope 07 01 03 stigma attached to COVID ation through television media LK-MOH-205849-NC-RFQ / Airing video Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-03- communication to mitigate IDA / 65950 Post Limited 54,054.00 0.00 Implement COVID-19 Response Quotations Envelope 07 01 03 stigma attached to COVID ation through television media LK-MOH-207673-NC-DIR / Pending Extension of Central Air Component 1: Emergency 2020-12- 2020-12- 2021-01- 2021-07- IDA / 65950 Post Direct Selection Direct 81,081.00 0.00 Implement Conditioning system at DGH COVID-19 Response 22 27 31 30 ation Gampaha. LK-MOH-207669-NC-RFQ / Design & Development of Pending Component 1: Emergency Request for Single Stage - One 2020-12- 2021-02- 2021-02- 5 Video Clips ( 3-5 min) to TF / B3017 Post Limited 13,514.00 0.00 Implement COVID-19 Response Quotations Envelope 27 07 21 promote mental health ation across lifespan and settings LK-MOH-215774-NC-DIR / Establishment of Regular Vaccine Cold Chain Pending Monitoring Network System Component 1: Emergency 2021-02- 2021-02- 2021-03- 2021-09- IDA / 65950 Post Direct Selection Direct 108,108.00 0.00 Implement for Central and Regional COVID-19 Response 08 13 20 16 ation Medical supply devisions (Central Monitoring System Smart View) LK-MOH-224251-NC-RFQ Pending Component 1: Emergency Request for Single Stage - One 2021-04- 2021-05- 2021-11- / Labortary investigation for IDA / 65950 Post Limited 26,400.00 0.00 Implement COVID-19 Response Quotations Envelope 04 30 26 vitamin D serum ation C/creatining LK-MOH-224238-NC-RFQ / supply installation and Component 1: Emergency Request for Single Stage - One 2021-04- 2021-06- 2021-12- IDA / 65950 Post Limited 6,320.00 0.00 Canceled commissioning of medical COVID-19 Response Quotations Envelope 13 08 05 gas / oxygen to HDU LK-MOH-231677-NC-DIR / Provision of server space, connectivity and required Component 2: modifications to establish a Strengthening National and Pending Laboratory Information 2021-05- 2021-05- 2021-07- 2021-12- IDA / 65950 Sub-national Institutions Post Direct Selection Direct 185,000.00 0.00 Implement System for connecting 33 25 30 04 31 for Prevention and ation PCR labs with public Health Preparedness Field units involved with sampling, diagnosis and contact tracing (LIMS) CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual LK-MOH-195368-CS-CQS / Redesign Sri Lanka College of Psychiatry website to Consultant Component 1: Emergency Pending 2020-10- 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- provide public information TF / B3017 Post Qualification Open - National 42,105.00 0.00 COVID-19 Response Implementation 06 27 10 09 13 12 regarding island wide Selection services and online therapy under Covid Grant INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated Contract / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract No. Approach Amount (US$) Status Contract Completion (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOH-207591-CS-CDS / Consultancy Services to Strengthening Community Component 1: Emergency Pending 2020-12- 2021-01- 2021-03- 2021-09- TF / B3017 Post Direct Selection Direct 75,805.00 0.00 Engagement Activities in the COVID-19 Response Implementation 22 01 07 03 COVID 19 situation in the country. Page 21 Procurement Plan for Punjab RWSS (P150520) I. General 1. Bank’s approval Date of the procurement Plan 2012 2. Date of General Procurement Notice: [October 01, 2014 ] 3. Period covered by this procurement plan: January 2020 onwards II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as per the Procurement Risk Rating of the Project: 2. Procurement Method Prior Review Threshold US$ 1. ICB and LIB (Goods) Above US$ 2M 2. NCB (Goods) Above US$ 1M 3. ICB (Works) Above US$ 40 million 4. NCB (Works) Above US$ 10 million 5. (Non-Consultant Services) Above US$ 1M 2. Prequalification for Bidders _Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P150520 5. Any Other Special Procurement Arrangements: In addition, the justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold 1. Competitive Methods (Firms) Above US$ 1M 2. Single Source (Firms) Above US$ 500,000 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT India : Punjab Rural Water and Sanitation Sector Improvement Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2018-09-05 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150520 GPN Date: Project Name: Punjab Rural Water and Sanitation Sector Improvement Project Loan / Credit No: IBRD / 84870 HR Manager Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PRWSS-C-SPMC-5543-1 / Hiring of consultant to act as Strengthening Institutions IBRD / 84870 Post Direct Selection Direct 20,000.00 15,235.43 Signed 2018-08-31 2018-08-31 2018-09-01 2018-09-24 2018-09-01 2018-09-24 2019-09-01 Director Water Quality from and Project Management 01-09-2018 to 31-08-2019 PRWSS-C-SPMC-5646-1 / Hiring Sr. Environment Strengthening Institutions IBRD / 84870 Post Direct Selection Direct 27,700.00 1,800.97 Signed 2018-10-22 2018-04-27 2018-10-25 2018-10-22 2018-10-31 2018-10-22 2019-10-31 Specialist under PRWSSIP and Project Management Project. PRWSS-C-SPMC-5907-1 / Hiring of Advisor (Litigation) Strengthening Institutions IBRD / 84870 Post Direct Selection Direct 16,700.00 14,053.33 Signed 2018-12-18 2018-12-18 2018-12-26 2019-01-14 2018-12-28 2019-01-14 2019-12-28 in Department of Water and Project Management Supply and Sanitation, Punjab. PRWSS-C-SPMC-5365-2 / Hiring Liason Officer in Water Strengthening Institutions IBRD / 84870 Post Direct Selection Direct 18,000.00 14,449.69 Signed 2019-05-07 2018-05-03 2019-05-17 2019-05-09 2019-07-21 2019-05-09 2020-05-06 Supply and Sanitation and Project Management Department. PRWSS-C-SPMC-8190-1 / Strengthening Institutions Hiring Liason officer in WSS IBRD / 84870 Post Direct Selection Direct 17,000.00 0.00 Under Review 2020-04-26 2020-05-07 2020-05-04 2020-05-07 2021-05-07 and Project Management (continuation in Services) PRWSSIP-C-SPMC-6987-1 / Hiring of consultant to act as Strengthening Institutions IBRD / 84870 Post Direct Selection Direct 17,500.00 0.00 Canceled 2019-09-09 2019-08-31 2019-09-10 2019-09-10 2020-09-09 Director Water Quality from and Project Management 01-09-2019 to 31-08-2020 PRWSS-C-SPMC-7806-1 / Hiring of Advisor (Litigation) Strengthening Institutions IBRD / 84870 Post Direct Selection Direct 16,000.00 0.00 Canceled 2020-01-10 2020-01-12 2020-01-14 2021-01-13 in Department of Water and Project Management Supply and Sanitation, Punjab. PRWSS-C-SPMC-6666-1 / Strengthening Institutions Hiring of Consultant to act as IBRD / 84870 Post Direct Selection Direct 36,000.00 0.00 Canceled 2019-09-01 2019-09-16 2019-11-25 2021-11-24 and Project Management Building Construction Expert PRWSS-C-SPMC-9573-1 / Strengthening Institutions Hiring Liason officer in WSS IBRD / 84870 Post Direct Selection Direct 2,286.00 2,195.70 Signed 2021-05-11 2021-05-07 2021-05-13 2021-06-10 2021-05-16 2021-06-11 2021-06-30 and Project Management (continuation in Services) Page 1 Jhelum & Tawi Flood Recovery Project (Project ID: P154990) Procurement Summary I. General 1. Project Information: Project Name: Jhelum & Tawi Flood Recovery Project Country: India Project Code: P154990 2. Bank’s approval Date of the procurement Plan: Draft Procurement Plan dated April 24, 2015 Revision 0: Agreed by the Bank on April 25, 2015 Revision 1: March 30, 217 Revision 2: Feb 15 2019 3. Date of General Procurement Notice: September 01 2015 4. Period covered by this procurement plan: next 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Methods and Threshold Category Method of Threshold (US$ Equivalent) Procurement Goods and Non- ICB >3,000,000 consultant LIB Wherever agreed by the services Bank NCB Up to 3,000,000 (with NCB conditions) Shopping Up to 500,000 DC As per Para 3.7 of the Bank Guidelines, wherever agreed and with prior agreement with the Bank Force Account As per Para 3.9 of Guidelines Framework As per Para 3.6 of Agreements Guidelines Works and Supply ICB >40,000,000 and Installation NCB Up to 40,000,000 (with NCB conditions) Shopping Up to 1,000,000 carried out through a qualified local contractor selected through shopping (after inviting a minimum of three quotations in response to a written invitation with a minimum of 15 days’ notice period) Force Account As per Para 3.9 of Guidelines DC As per Para 3.7 of Guidelines,  Prior Review by the Bank. The Bank will prior review the following contracts: • Works: All contracts more than US$ 10.0 million equivalent; • Goods: All contracts more than US$ 2.0 million equivalent; • Information Technology: All contracts more than US$ 2.0 million equivalent; and • Non-Consulting Services: All contracts more than US$ 2.0 million equivalent  The PMU shall prior review the first contract issued by each implementing agency, if the estimate of those contracts are below the prior review threshold value. The Bank will conduct prior review for only those contract whose estimate falls in prior review threshold value. In addition, the justifications for all contracts to be issued on LIB, single-source (>US$ 30,000) or direct contracting (>US$ 30,000) basis will be subject to Banks prior review. These thresholds are for the initial 18 months period and are based on the procurement performance of the project, these thresholds will be modified. In addition, the Bank will carry out an annual ex post procurement review of the procurement falling below the prior review threshold mentioned above.  All contracts below the specified prior review threshold value shall be subject to Post Procurement Review (PPR). The IA shall prepare a list of contract and submit it to the Bank for conducting PPR. The PPR will be conducted on annual basis. 2. Pre-qualification. Not applicable 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued by Project Management Unit JTFRP, J&K, India All the contracts issued under the project will follow the World Bank’s Guidelines: Bank’s “Guidelines: Procurement under IBRD Loans and IDA Credits” dated January 2011and revised in July 2014and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated January 2011 and revised in July 2014, In case of any inconsistency between the Procurement Manual or Government Procurement Procedures and the Bank Guidelines, the latter shall prevail. 4. Any Other Special Procurement Arrangements: The bid evaluation will be carried out as per agreed timeline in the Procurement Manual.  National Competitive Bidding (NCB): Any contract exceeding shopping threshold shall be procured using NCB method. The model bidding documents for NCB as agreed with the GoI Task Force (and as amended from time to time), shall be used for bidding. The following NCB provisions shall apply: i. Only the model bidding documents for NCB as agreed with the GoI Task Force (and as amended from time to time), shall be used for bidding. ii. Invitation to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids. For smaller packages (lesser than US$1 million for Works and US$ 500,000 for Goods), advertisement in state newspapers will be accepted with at least 15 days given for submission of bids; iii. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprise from any given State; iv. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; v. At the Borrower's request, the Bank may agree to the Borrower's use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. vi. For prior review contracts, extension of bid validity shall not be allowed with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by Bank only in cases of Force Majeure and circumstance beyond the control of the Purchaser/Employer); vii. For prior review contracts , re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank; viii. The system of rejecting bids outside a pre-determined margin or “bracket” of prices shall not be used in the project; ix. Government e-Marketplace (GeM)1 set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations (RFQ) method. x. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. xi. Two or three envelop system will not be used (expect when suing e-procurement system assessed and agreed by the Bank. xii. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety ("ESHS") risks and impacts.  Force Account: When contractors/suppliers are unlikely to bid at reasonable prices because of the location and risk associated with the project or a certain government agency has exclusive rights in certain type of works/supply, borrowers may use their own government departments’ personnel and equipment or government owned construction unit may be the only practical method, provided that the borrower has sufficient managerial capacity and possesses the required technical and financial controls to report to the Bank on expenditure as per paragraph 3.9 of the Procurement Guidelines.  Framework Agreements: State level rate contracts will be examined by the Bank and if agreed, may also be used as framework agreements. Implementing agencies also have option to set-up new framework agreements as per paragraph 3.6 of Guidelines.  Use of government Institutions and Enterprise: Government owned enterprise or institutions in India may be hired for its unique and exceptional nature if their participation is considered critical to the project implementation. In such cases, the conditions given in clauses 1.13 of Consultant Guidelines shall be satisfied and each case will be subject to prior review by the Bank. The works contracts up to cumulative amount of 37.5 million USD, would be directly executed by the J&K Projects Construction 1 Use of GeM will be allowed in lieu of RFQ as per following details: • up to INR 50,000 in catalogue mode (viz. any available item could be selected by IA without further competition), provided selected Item/Supplier meeting the requisite quality, specification and delivery period. • up to INR 3 Million from the Supplier having lowest price amongst at least three Suppliers meeting the requisite quality, specification and delivery period. The tools for online bidding and online reverse auction available on GeM may be used by the Purchaser. • up to INR equivalent of US$ 500,000 from the Supplier having lowest price and meeting the requisite quality, specification and delivery period after mandatorily obtaining bids from at least three Suppliers, using online bidding or reverse auction tool provided on GeM. Corporation Ltd., which a Public Sector Undertaking. J&K Projects Construction Corporation Ltd. is executing projects of State as well as Central Government departments. 5. Summary of the Procurement Packages planned during the first 18 months and thereafter: Available on STEP III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Category Method of Procurement Threshold (US$ Equivalent) Consultants’ CQS Up to 500,000 Services SSS Up to 200,000 As per para 3.9-3.11 of Guidelines Individuals As per Section V of Guidelines QCBS/QBS/FBS/LCS for all other cases (i) International >800,000 shortlist (ii) Shortlist may Up to 800,000 comprise national consultants only  Prior Review by the Bank. The Bank will prior review the following contracts: o Consulting Services: All contracts more than US$ 1.0 million equivalent for firm; and o Consulting Services: All contracts more than US$ 300,000 equivalent for Individuals. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule: Available on STEP Use of e-procurement portal Procurement of goods works and non-consultancy services shall be conducted using the e-procurement portal www.jktenders.gov.in. All IAs shall use this e-procurement portal for procurement of goods works and non-consulting services. PROCUREMENT India : Jhelum and Tawi Flood Recovery Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2016-12-22 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154990 GPN Date: 2016-11-18 Project Name: Jhelum and Tawi Flood Recovery Project Loan / Credit No: IDA / 56950 I Executing Agency(ies): ndustry & Commerce Department (I&CD), J&K WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned JTFRP/JK/IC/JKI/B/W001/16 / Construction/Repairs of factory Building at Bemina Woolen Mills Sgr. under Restoration and Single Stage - Two 2018-11- Project JTRF for restoration IDA / 56950 Post Request for Bids Open - National 732,230.00 218,451.40 Signed 2017-01-30 2017-08-18 2017-02-06 2017-03-08 2017-10-25 2017-04-14 2018-02-16 2017-05-19 2018-03-01 strengthening of livelihoods Envelope 18 and strengthening of livelihood for Composite Market Centre for Whole Chain of Wool Activity . JTFRP/JK/IC/JKI/R/W002/16 / Construction of factory building under JTFR Project for Restoration and Restoration and Single Stage - Two 1,735,510.0 2018-12- Strengthening of Livelihood IDA / 56950 Post Request for Bids Open - National 2,937,100.00 Signed 2017-01-30 2017-08-01 2017-02-06 2017-08-11 2017-03-08 2017-12-13 2017-04-14 2018-02-16 2017-05-22 2018-03-01 strengthening of livelihoods Envelope 0 21 for Composite Market Centre for Whole chain of Silk Activity at Silk Factory Rajbagh Srinagar. JTFRRP/JK/IC/CDI/CSPEP/W00 1/16 / Construction of PG Restoration and Single Stage - Two 2018-12- building at Craft Development IDA / 56950 Post Request for Bids Open - National 400,000.00 0.00 Canceled 2017-01-30 2017-02-04 2017-03-06 2017-04-20 2017-06-01 strengthening of livelihoods Envelope 01 Institute Srinagar under JTFRP . JTFRP/JK/IC/BWM/W003/19 / Interior works for showroom Restoration and Single Stage - Two 2019-12- cum interpretation centre for IDA / 56950 Post Request for Bids Open - National 338,500.00 312,919.37 Signed 2019-01-25 2019-04-13 2019-01-30 2019-04-29 2019-03-13 2019-06-21 2019-05-26 2019-10-07 2019-06-30 2019-11-29 strengthening of livelihoods Envelope 27 Government Woollen Mills Bemina Srinagar J&K GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JTFRP/JK/IC/CDI/CSPEP/G001 /16 / Procurement of Digital and IT Equipment's , net working soft ware for upcoming post Graduate Restoration and Single Stage - One program in craft Design and IDA / 56950 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2018-03-13 2018-03-18 2018-04-17 2018-06-01 2018-07-06 2018-10-04 strengthening of livelihoods Envelope sustainable development in creative industries being launched by CDI.Sgr under JTFRP for restoration strengthening of livelihoods. JTFRP/JK/IC/CDI/CSPEP/G003 /16 / Procurement for Printing of Brochures and other publicity materials for upcoming post graduate Restoration and Single Stage - One IDA / 56950 Post Request for Bids Open - National 8,000.00 0.00 Canceled 2018-01-09 2018-01-14 2018-02-13 2018-03-06 2018-04-13 2018-06-12 Programs in craft design and strengthening of livelihoods Envelope sustainable development in creative industries to be launched by CDI Sgr. under JTFRP . JTFRP/JK/IC/JKI/R/G001/16 / Procurement of machines under Jhelum and Tawi flood recovery project for restoration and Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 651,098.00 0.00 Canceled 2018-02-25 2018-03-07 2018-04-10 2018-05-18 2018-06-05 2018-12-05 strengthening of livelihood strengthening of livelihoods Envelope composite market centre for whole chain of silk activity in Govt. Silk Factory Rajbagh Srinagar. JTFRP/JK/IC/JKI/B/G002/16 / Procurement of machines under Jehlum and Tawi Flood recovery project for restoration and strengthening Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 1,074,124.00 0.00 Canceled 2018-02-26 2018-03-10 2018-04-14 2018-05-20 2018-06-10 2018-12-15 of livelihoods composite strengthening of livelihoods Envelope market centre for whole chain of wool activity in Govt. Wool Mills at Bemina Srinagar. JTFRP/JK/IC/BWM/G001/18 / Supply installation testing and Restoration and Single Stage - Two commissioning of various IDA / 56950 Post Request for Bids Open - National 338,460.00 0.00 Canceled 2018-09-28 2018-10-05 2018-10-03 2018-10-16 2018-11-14 2018-11-24 2019-01-27 2019-03-03 2019-08-30 strengthening of livelihoods Envelope textile machinery for Govt. Woolen mills Bemina JTFRP/JK/IC/BWM/G002/18 / Supply installation testing and Restoration and Single Stage - Two commissioning of cone IDA / 56950 Post Request for Bids Open - National 55,385.00 0.00 Canceled 2018-09-28 2018-10-06 2018-10-03 2018-10-16 2018-11-14 2018-11-24 2019-01-27 2019-03-03 2019-08-30 strengthening of livelihoods Envelope winders for Govt Woollen Mills Bemina Page 1 JTFRP/JK/IC/BWM/G003/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of Pirn IDA / 56950 Post Request for Bids Open - National 16,155.00 0.00 Canceled 2018-09-28 2018-10-09 2018-10-03 2018-10-16 2018-11-14 2018-11-26 2019-01-27 2019-03-03 2019-08-30 strengthening of livelihoods Envelope winder for Govt Woollen Mills Bemina JTFRP/JK/IC/BWM/G004/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of Rapier IDA / 56950 Post Request for Bids Open - National 246,150.00 0.00 Canceled 2018-10-02 2018-10-09 2018-10-07 2018-10-16 2018-11-18 2018-11-26 2019-01-31 2019-03-07 2019-09-03 strengthening of livelihoods Envelope Looms for Government Woollen Mills Bemina JTFRP/JK/IC/BWM/G005/18 / Supply Installation Testing and Commissioning of roller Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 30,770.00 0.00 Canceled 2018-10-03 2018-10-09 2018-10-08 2018-10-16 2018-11-19 2018-11-27 2019-02-01 2019-03-08 2019-09-04 calendaring machine for strengthening of livelihoods Envelope Government Woollen Mills Bemina. JTFRP/JK/IC/BWM/G006/18 / Supply Installation Testing and Commissioning of dyeing Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 170,000.00 0.00 Canceled 2018-10-08 2018-10-09 2018-10-13 2018-10-16 2018-11-24 2018-11-27 2019-02-06 2019-03-13 2019-09-09 and related machinery for strengthening of livelihoods Envelope Government Woollen Mills Bemina JTFRP/JK/IC/BWM/G007/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of Boilers IDA / 56950 Post Request for Bids Open - National 138,460.00 0.00 Canceled 2018-10-08 2018-10-09 2018-10-13 2018-10-16 2018-11-24 2018-11-28 2019-02-06 2019-03-13 2019-09-09 strengthening of livelihoods Envelope for Government Woollen Mills Bemina JTFRP/JK/IC/BWM/G008/18 / Supply Installation Testing and Commissioning of Fabric Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 23,000.00 0.00 Canceled 2018-10-08 2018-10-09 2018-10-13 2018-10-16 2018-11-24 2018-11-29 2019-02-06 2019-03-13 2019-09-09 Inspection machines at strengthening of livelihoods Envelope Government Woollen Mills Bemina JTFRP/JK/IC/BMW/G009/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of Twist IDA / 56950 Post Request for Bids Open - National 15,385.00 0.00 Canceled 2018-10-05 2018-10-09 2018-10-10 2018-10-16 2018-11-21 2018-11-29 2019-02-03 2019-03-10 2019-09-06 strengthening of livelihoods Envelope Setting Chamber Government Woollen Mills Bemina JTFRP/JK/IC/RSF/G001/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of rapier IDA / 56950 Post Request for Bids Open - National 653,900.00 0.00 Canceled 2018-10-24 2018-10-20 2018-10-29 2018-10-29 2018-12-10 2018-12-12 2019-02-22 2019-03-29 2019-09-25 strengthening of livelihoods Envelope Looms for Govt Silk Factory Rajbagh Srinagar J&K JTFRP/JK/IC/BWM/G014/19 / Supply Installation, Testing and Commissioning of Rapier Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 133,000.00 347,936.00 Signed 2019-01-21 2019-01-18 2019-01-26 2019-01-23 2019-03-09 2019-03-12 2019-05-22 2019-11-11 2019-06-26 2020-02-10 2019-09-24 looms for Government strengthening of livelihoods Envelope Woollen Mills Bemina Srinagar J&K JTFRP/JK/IC/RSF/G011/19 / Supply Installation Testing & Under Restoration and Single Stage - Two commissioning of Rapier IDA / 56950 Post Request for Bids Open - National 625,000.00 0.00 Implementati 2019-01-21 2019-01-17 2019-01-26 2019-01-22 2019-03-09 2019-05-22 2019-06-26 2019-09-24 strengthening of livelihoods Envelope Looms for Government Silk on Factory Rajbagh, Srinagar J&K JTFRP/JK/IC/RSF/G002/19 / Supply Installation Testing and Commissioning of Two Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 1,086,000.00 0.00 Canceled 2019-05-27 2019-05-27 2019-06-01 2019-06-11 2019-07-13 2019-09-25 2019-10-30 2020-04-27 for One Twisters for strengthening of livelihoods Envelope Government Silk Factory Rajbagh Srinagar, J&K JTFRP/JK/IC/RSF/G003/19 / Supply Installation Testing and Commissioning of Restoration and Single Stage - Two preparatory machinery for IDA / 56950 Post Request for Bids Open - National 121,500.00 0.00 Canceled 2019-06-14 2019-06-24 2019-06-19 2019-07-09 2019-07-31 2019-10-13 2019-11-17 2020-05-15 strengthening of livelihoods Envelope government silk factory rajbagh Srinagar Jammu and Kashmir JTFRP/JK/IC/RSF/G022/19 / Supply Installation Testing and Commissioning of Two Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 634,500.00 622,940.85 Signed 2019-07-21 2019-09-09 2019-07-26 2020-02-29 2019-09-06 2019-11-09 2019-11-19 2019-12-24 2019-12-24 2020-02-14 2020-06-21 for One Twisters for strengthening of livelihoods Envelope Government Silk Factory Rajbagh Srinagar J&K JTFRP/JK/IC/BWM/G017/19 / Supply Installation Testing & Restoration and Single Stage - Two Commissioning of boilers for IDA / 56950 Post Request for Bids Open - National 133,000.00 0.00 Canceled 2019-01-21 2019-01-18 2019-01-26 2019-03-09 2019-05-22 2019-06-26 2019-09-24 strengthening of livelihoods Envelope Government Woollen Mills Bemina Srinagar J&k JTFRP/JK/IC/BWM/G011/19 / Supply Installation & Testing Restoration and Single Stage - Two of various textile machinery IDA / 56950 Post Request for Bids Open - National 338,460.00 0.00 Canceled 2019-01-21 2019-01-18 2019-01-26 2019-01-23 2019-03-09 2019-05-22 2019-06-26 2019-09-24 strengthening of livelihoods Envelope for Government Woollen Mills, Bemina, Srinagar J&K JTFRP/JK/IC/BWM/G016/19 / Supply Installation Testing & Commissioning of dyeing & Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 162,500.00 0.00 Canceled 2019-01-21 2019-01-18 2019-01-26 2019-01-23 2019-03-09 2019-05-22 2019-06-26 2019-09-24 related machinery for strengthening of livelihoods Envelope Government Woollen Mills Bemina Srinagar J&K JTFRP/JK/IC/BWM/G017/19- 2 / Supply Installation Testing and Commisioning of Boilers Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 193,000.00 0.00 Canceled 2020-03-10 2020-04-05 2020-03-15 2020-05-12 2020-04-26 2020-07-09 2020-08-13 2020-11-11 for Government Woolen Mills strengthening of livelihoods Envelope Bemina and Government Silk Factory Rajbagh Srinagar J&K Page 2 JTFRP/JK/IC/BWM/G016/19- 2 / Supply Installation Testing Under and Commissioning of dyeing Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 162,500.00 0.00 Implementati 2020-03-10 2020-05-11 2020-03-15 2020-05-20 2020-04-26 2020-07-09 2020-08-13 2020-11-11 & related machinery for strengthening of livelihoods Envelope on Government Woollen Mills Bemina Srinagar J&K JTFRP/JK/IC/BWM/G011/19- 2 / Supply Installation Testing Under and Commissioning for Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 338,460.00 0.00 Implementati 2020-03-10 2020-08-10 2020-03-15 2020-09-12 2020-04-26 2020-07-09 2020-08-13 2020-11-11 various textile machinery for strengthening of livelihoods Envelope on Government Woollen Mills Bemina Srinagar J&K JTFRP/JK/IC/RSF/G003/19-2 / Supply, Installation, Testing and Commissioning of Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 104,300.00 61,849.02 Signed 2020-05-19 2020-05-22 2020-05-24 2020-05-26 2020-07-05 2020-06-26 2020-09-17 2020-07-25 2020-10-22 2020-08-10 2021-04-20 Preparatory Machinery for strengthening of livelihoods Envelope Government Silk Factory, Rajbagh, Srinagar, J&K. JTFRP/JK/IC/RSF/G021/20 / Supply Installation Testing Under Restoration and Single Stage - Two and Commissioning of rapier IDA / 56950 Post Request for Bids Open - National 385,700.00 0.00 Implementati 2020-07-21 2020-08-02 2020-07-26 2020-08-10 2020-09-06 2020-11-19 2020-12-24 2021-06-22 strengthening of livelihoods Envelope Looms for Govt Silk Factory on Rajbagh Srinagar J&K JTFRP/JK/IC/RSF/G043/20 / Supply Installation Testing Under and Commissioning of Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 185,700.00 0.00 Implementati 2020-07-22 2020-08-02 2020-07-27 2020-08-10 2020-09-07 2020-11-20 2020-12-25 2021-06-23 Weaving and Finishing strengthening of livelihoods Envelope on Machinery for Government Silk Factory Rajbagh Srinagar J&K JTFRP/JK/IC/BWM/G001/20 / Supply of bought out items Under Restoration and for Interiors of new showroom IDA / 56950 Post Direct Selection Direct 35,700.00 0.00 Implementati 2020-10-16 2020-10-05 2020-10-21 2020-11-25 2021-05-24 strengthening of livelihoods cum interpretation centre at on Govt Woollen Mills Bemina JTFRP/JK/IC/BWM/G017/19- 2-2 / Supply Installation Testing and Commisioning of Restoration and IDA / 56950 Post Request for Bids 193,000.00 0.00 Canceled 2020-10-07 2020-12-24 2020-10-12 2021-01-05 2020-11-23 2021-02-05 2021-02-05 2021-03-12 2021-06-10 Boilers for Government strengthening of livelihoods Woollens Mills Bemina and Government Silk Factory Rajbagh JTFRP/JK/IC/BWM/G001/21 / Supply, Installation, Testing & Commissioning of Boilers for Under Restoration and Single Stage - Two Government Silk Factory, IDA / 56950 Post Request for Bids Open - National 235,700.00 0.00 Implementati 2021-05-12 2021-05-19 2021-05-17 2021-05-25 2021-06-06 2021-07-30 2021-09-03 2021-12-02 strengthening of livelihoods Envelope Rajbagh and Government on Woollen Mills, Bemina, Srinagar, J&K NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JTFRP/JK/IC/CDI/CSPEP/C003 /16 / Providing of consultancy services towards design of publicity and promotion material for Restoration and Least Cost IDA / 56950 Post Open - National 3,071.00 0.00 Canceled 2017-06-28 2017-07-12 2017-08-11 2017-09-10 2017-09-25 2017-10-17 2017-11-21 2017-12-21 launching of Post Graduate strengthening of livelihoods Selection Program in Craft Design and sustainable development in creative industriesby CDI Sgr under JTFRP . JTRF/JK/IC/HD/C002/16 / Consultancy for census of Restoration and Quality And Cost- Craft practitioners in J&K and IDA / 56950 Post Open - National 307,700.00 368,747.71 Signed 2017-01-25 2017-01-22 2017-02-08 2017-04-05 2017-03-10 2017-08-20 2017-04-16 2018-08-20 2017-05-01 2018-10-20 2017-05-23 2019-03-14 2017-06-27 2019-05-30 2018-06-27 strengthening of livelihoods Based Selection to develop a complete Artisans database. JTFRP/JK/IC/HD/C001/16 / Consultancy for feasibility of Reconstruction of roads and Quality And Cost- IDA / 56950 Post Open - National 15,400.00 0.00 Canceled 2017-01-28 2017-01-19 2017-02-12 2017-04-05 2017-03-19 2017-04-18 2017-05-03 2017-05-25 2017-06-29 2017-08-28 site & working Model for bridges Based Selection Kashmir Haat. JTFRP/JK/IC/HD/C003/17 / Develop E Commerce Strategy and Actionable Business Plan, Restoration and Quality And Cost- Design Build And Maintain E IDA / 56950 Post Open - National 230,800.00 0.00 Canceled 2017-03-15 2017-03-13 2017-04-05 2017-04-05 2017-05-19 2017-06-16 2017-07-01 2017-08-05 2017-09-09 2021-03-12 strengthening of livelihoods Based Selection Commerce Portal and Manage E Commerce Operations under JTFRP. JTFRP/JK/IC/HD/C006/17 / Develop E Commerce Strategy and Actionable Business Plan, Restoration and Quality And Cost- Design Build And Maintain E IDA / 56950 Post Open - National 230,800.00 0.00 Canceled 2017-08-10 2017-09-26 2017-08-31 2017-10-20 2017-10-14 2017-11-11 2017-12-11 2018-01-15 2018-02-19 2020-06-01 strengthening of livelihoods Based Selection Commerce Portal and Manage E Commerce Operations under JTFRP JTFRP/JK/IC/HD/R/C001/18 / Consultancy for feasibility of site and working model for Restoration and Quality And Cost- IDA / 56950 Post Open - National 80,000.00 0.00 Canceled 2018-03-25 2018-04-19 2018-04-15 2018-05-29 2018-06-26 2018-07-26 2018-08-30 2018-10-04 2019-01-02 Kashmir Haat and strengthening of livelihoods Based Selection International Trade Centre at Pampore Page 3 JTFRP/JK/IC/HD/ECOM/C002/ 18 / Develop e-Commerce Strategy and Actionable Restoration and Quality And Cost- Business PlanDesign, Build, IDA / 56950 Post Open - National 230,800.00 0.00 Canceled 2018-04-27 2018-08-06 2018-05-07 2018-06-13 2018-07-11 2018-07-26 2018-08-30 2018-10-04 2022-04-06 strengthening of livelihoods Based Selection Maintain and Manage e- Commerce Operations under JTFRP JTFRP/JK/IC/JKI/UCCN/C002/ 18 / Consultancy Services For preparation of dossier for Restoration and Quality And Cost- IDA / 56950 Post Open - National 115,400.00 64,016.52 Signed 2018-08-05 2018-08-06 2018-08-26 2018-10-09 2018-10-01 2018-11-06 2018-12-11 2018-12-06 2019-03-20 2019-01-10 2019-04-10 2019-02-14 2019-04-23 2020-02-14 inclusion of Srinagar city On strengthening of livelihoods Based Selection UNESCO Creative Cities Network JTFRP/JK/IC/HD/WW/C005/18 / Consultancy services to carry out end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-09-28 2018-10-15 2018-10-03 2018-11-10 2018-11-16 2018-12-14 2019-01-13 2019-02-17 2019-03-24 2020-03-23 development activities in strengthening of livelihoods Based Selection willow wicker cluster at Ganderbal JTFRP/JK/IC/HDD/WB/C007/1 8 / Consultancy services to undertake Cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-10-18 2018-10-20 2018-11-08 2018-11-10 2018-12-22 2019-01-19 2019-02-18 2019-03-25 2019-04-29 2022-04-04 Development activities in strengthening of livelihoods Based Selection Wool Cluster of Bandipora, Jammu and Kashmir JTFRP/JK/IC/HDD/WP/C008/1 8 / Consultancy services to undertake Cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-10-19 2018-10-25 2018-11-09 2018-11-10 2018-12-23 2019-01-20 2019-02-19 2019-03-26 2019-04-30 2022-04-04 Development activities in strengthening of livelihoods Based Selection Wool Cluster of Pulwama, Jammu and Kashmir JTFRP/JK/IC/BBC/C010/18 / Consultancy services to develop and launch branding Restoration and Quality And Cost- IDA / 56950 Post Open - National 153,850.00 0.00 Canceled 2018-10-29 2018-12-03 2018-11-19 2018-12-17 2019-01-02 2019-01-30 2019-03-01 2019-04-05 2019-05-10 2020-05-09 and communications strengthening of livelihoods Based Selection campaign for products of J&K state JTFRP/JK/IC/IML/C011/18 / Consultancy to undertake training of artisans in product development cycle for Restoration and Quality And Cost- IDA / 56950 Post Open - National 307,700.00 0.00 Canceled 2018-10-29 2018-12-03 2018-11-19 2018-12-17 2019-01-02 2019-01-30 2019-03-01 2019-04-05 2019-05-10 2021-05-09 International Market Linkages strengthening of livelihoods Based Selection in Willow Wicker, Papier Machie, Embroidery and Wool in Jammu and Kashmir JTFRP/JK/IC/HD/WW/C015/18 / Consultancy services to undertake end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-11-30 2018-12-03 2018-12-21 2018-12-17 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-11 2021-06-10 development actvities in strengthening of livelihoods Based Selection Willow Wicker Cluster in Ganderbal JTFRP/JK/IC/HDD/WP/C018/1 8 / Consultancy services for carrying out end to end Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-11-30 2018-12-03 2018-12-21 2018-12-17 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-11 2021-06-10 cluster development strengthening of livelihoods Based Selection activitiesin wool cluster at Pulwama JTFRP/JK/IC/HDD/WB/C017/1 8 / Consultancy services for Restoration and Quality And Cost- carrying out end to end IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-11-30 2018-12-03 2018-12-21 2018-12-17 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-11 2021-06-10 strengthening of livelihoods Based Selection cluster development activities in wool cluster at Bandipora. JTFRP/JK/IC/HD/ECOM/C012/ 19 / Consultancy services to develop e-Commerce Strategy Consultant Restoration and and Actionable Business Plan IDA / 56950 Post Qualification Open - National 230,800.00 0.00 Canceled 2019-01-20 2019-02-10 2019-03-26 2019-04-25 2019-05-30 2022-11-30 strengthening of livelihoods Design, Build, Maintain and Selection Manage e-Commerce Operations JTFRP/JK/IC/IML/C021/19 / to undertake Training of Artisans in Product Development Cycle for Restoration and Quality And Cost- Under IDA / 56950 Post Open - National 307,700.00 0.00 2019-02-18 2019-02-15 2019-03-11 2019-02-28 2019-04-24 2019-05-22 2019-06-21 2019-07-26 2019-08-30 2021-08-29 International Market Linkages strengthening of livelihoods Based Selection Implementation in Willow Wicker, Paper Mache, Crewel stitch embroidery and Wool in Jammu and Kashmir JTFRP/JK/IC/HDD/WB/C027/1 9 / Consultancy services to undertake Cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 256,006.78 Signed 2019-02-18 2019-03-12 2019-03-11 2019-03-21 2019-04-24 2019-06-25 2019-05-22 2019-08-29 2019-06-21 2019-12-10 2019-07-26 2019-12-16 2019-08-30 2020-02-10 2021-08-29 Development activities in strengthening of livelihoods Based Selection Wool Cluster of Bandipora, Jammu and Kashmir JTFRP/JK/IC/HDD/WP/C020/1 9 / Consultancy services to undertake Cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-02-18 2019-03-18 2019-03-11 2019-03-21 2019-04-24 2019-05-22 2019-06-21 2019-07-26 2019-08-30 2021-08-29 Development activities in strengthening of livelihoods Based Selection Wool Cluster of Pulwama, Jammu and Kashmir JTFRP/JK/IC/BBC/C020/19 / Consultancy services to Restoration and Quality And Cost- develop and launch branding IDA / 56950 Post Open - National 153,850.00 296,862.77 Signed 2019-02-18 2019-02-20 2019-03-11 2019-02-28 2019-04-24 2019-12-07 2019-05-22 2020-02-27 2019-06-21 2020-03-16 2019-07-26 2020-06-01 2019-08-30 2020-07-26 2020-08-29 strengthening of livelihoods Based Selection and communications Campaign for J&K products JTFRP/JK/HD/WW/C025/19 / Consultancy services to carry out end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-03-25 2019-03-15 2019-04-15 2019-03-21 2019-05-29 2019-06-26 2019-07-26 2019-08-30 2019-10-04 2021-10-03 development activities in strengthening of livelihoods Based Selection Willow Wicker craft at Ganderbal J&K Page 4 JTFRP/JK/IC/JKI/R/C005/19 / Consultancy services for Restoration and Quality And Cost- conservation/restoration and IDA / 56950 Post Open - National 114,300.00 116,526.88 Signed 2019-04-10 2019-04-10 2019-05-01 2019-04-14 2019-06-14 2019-12-04 2019-07-12 2020-02-12 2019-08-11 2020-02-18 2019-09-15 2020-04-24 2019-10-20 2020-06-30 2021-04-12 strengthening of livelihoods Based Selection adaptive reuse of Govt Silk Factory Rajbagh, Srinagar J&K JTFRP/JK/IC/HD/ECOM/022/1 9 / Consultancy services to develop e-Commerce Strategy Restoration and Quality And Cost- and Actionable Business Plan IDA / 56950 Post Open - National 657,100.00 0.00 Canceled 2019-04-12 2019-05-24 2019-05-03 2019-06-05 2019-06-16 2019-07-14 2019-08-13 2019-09-17 2019-10-22 2023-04-24 strengthening of livelihoods Based Selection Design, Build, Maintain and Manage e-Commerce Operations JTFRP/JK/HD/WW/C035/19 / Consultancy services to carry out end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-07-21 2019-09-01 2019-08-11 2019-09-29 2019-09-24 2019-10-22 2019-11-21 2019-12-26 2020-01-30 2022-01-29 development activities in strengthening of livelihoods Based Selection Willow Wicker craft at Ganderbal J&K JTFRP/JK/IC/HDD/WP/C030/1 9 / Consultancy services to Restoration and Quality And Cost- undertake cluster IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-07-21 2019-09-08 2019-08-11 2019-09-29 2019-09-24 2019-10-22 2019-11-21 2019-12-26 2020-01-30 2022-01-29 strengthening of livelihoods Based Selection development activities in Wool cluster of Pulwama J&K JTFRP/JK/HD/WW/C035/19-2 / Consultancy services to carry out end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 154,542.70 Signed 2019-11-06 2019-10-20 2019-11-27 2019-11-19 2020-01-10 2020-05-23 2020-02-07 2020-05-29 2020-03-08 2020-06-06 2020-04-12 2020-06-18 2020-05-17 2020-08-14 2022-05-17 development activities in strengthening of livelihoods Based Selection willow wicker cluster at ganderbal JTFRP/JK/IC/HDD/WP/C030/1 9-2 / Consultancy services to Restoration and Quality And Cost- undertake end to end cluster IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-11-06 2019-11-04 2019-11-27 2019-11-19 2020-01-10 2020-02-07 2020-03-08 2020-04-12 2020-05-17 2022-05-17 strengthening of livelihoods Based Selection development activities in wool cluster at Pulwama INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JTFRP/JK/IC/JKI/R/C001/16 / Consultancy to provide technical assistance for Restoration and assessing tangible and IDA / 56950 Post Direct Selection Direct 15,400.00 41,127.33 Completed 2017-01-18 2017-01-19 2017-02-01 2017-02-18 2017-03-29 2017-04-07 2017-05-13 2017-06-10 strengthening of livelihoods intangible heritage value of Building at Silk Factory Rajbagh Srinagar. JTFRP/JK/IC/CDI/CSPEP/C002 /16 / Individual Consultant for curriculum, course material development and It equipment for CDIs PG Individual Restoration and programs in Craft Design and IDA / 56950 Post Consultant Limited 23,000.00 0.00 Canceled 2017-01-05 2017-01-05 2017-01-10 2017-01-15 2017-01-31 2017-03-07 2017-09-03 strengthening of livelihoods sustainable development in Selection creative industries Under JTFRP for restoration and Strengthening of Livelihoods at CDI Sgr. JTFRP/JK/IC/RB/C002/17 / Consultancy for Technical Individual assistance in sourcing Restoration and IDA / 56950 Post Consultant Limited 15,400.00 4,706.07 Signed 2017-03-06 2017-04-06 2017-03-13 2017-05-05 2017-04-03 2017-06-06 2017-05-08 2017-06-20 2017-06-12 machines and Equipments for strengthening of livelihoods Selection Silk Factory Rajbagh and Bemina Woolen Mills Srinagar. JTFRP/JK/IC/JKI/BD/C003 / Consultancy for providing Restoration and retail Design of show rooms IDA / 56950 Post Direct Selection Direct 23,000.00 69,319.56 Signed 2017-04-06 2017-03-01 2017-04-16 2017-04-14 2017-06-20 2017-06-20 2018-12-20 strengthening of livelihoods at Bemina Woolen Mills and Dehli Show room under JTFRP . JTFRP/JK/IC/JKI/R/B/C002/17 / Consultancy for Technical Assistance in sourcing Individual Restoration and machines and equipments for IDA / 56950 Post Consultant Open 15,400.00 0.00 Canceled 2017-02-20 2017-04-01 2017-04-12 2017-05-03 2017-06-07 strengthening of livelihoods Silk factory RajBagh and Selection Bemina Woolen Mills Srinagar. JTFRP/JK/IC/HD/C004/17 / Consultancy services of Domain Expert towards the Restoration and IDA / 56950 Post Direct Selection Direct 461,500.00 340,042.11 Signed 2018-02-05 2018-02-05 2018-02-15 2018-02-08 2018-04-21 2018-07-25 2020-11-09 development of Crewel strengthening of livelihoods Chainstitch Cluster at Noor Bagh. JTFRP/JK/IC/HD/CD-PM- C004-18 / Consultancy Restoration and services for development of IDA / 56950 Post Direct Selection Direct 461,500.00 309,975.39 Signed 2018-04-18 2018-04-18 2018-04-28 2018-04-23 2018-05-21 2018-07-25 2020-05-31 strengthening of livelihoods Papier Machie Cluster at Zadibal Srinagar JTFRP/JK/IC/JKI/CRB001/18 / Consultancy for Technical Assistance and Project Supervision for Various Restoration and IDA / 56950 Post Direct Selection Direct 33,900.00 24,213.75 Signed 2018-07-31 2017-12-11 2018-08-06 2018-04-10 2018-10-10 2018-07-31 2019-04-08 Building Works Identified strengthening of livelihoods Under The Livelihood Component of Jehlum Tawi Floor Recovery Project JTFRP/JK/IC/HD/ITC/C006/18 / Consultancy services for feasibility study of site and Restoration and IDA / 56950 Post Direct Selection Direct 77,000.00 0.00 Canceled 2018-10-17 2018-10-27 2018-12-31 2019-06-29 working model for Kashmir strengthening of livelihoods Haat and International Trade Centre Pampore JK Page 5 JTFRP/JK/IC/SOL/C001/19 / Consultancy services for Restoration and Under adaptive reuse of Solina IDA / 56950 Prior Direct Selection Direct 357,000.00 0.00 2019-12-16 2020-10-10 2019-12-26 2020-01-10 2020-02-29 2020-08-27 strengthening of livelihoods Implementation Filatures as Arts, Culture and Crafts Centre JTFRP/JK/IC/DS/S/C001/20 / Consultancy services for undertaking a comprehensive study to determine the requirements and Restoration and Under specifications of machinery, IDA / 56950 Post Direct Selection Direct 15,750.00 0.00 2020-07-21 2020-08-18 2020-07-31 2020-10-04 2021-04-02 strengthening of livelihoods Implementation allied equipment and facilities for the existing Common Facility Centre(CFC) and formulate Quality Control and Testing benchmarks for JTFRP/JK/IC/DS/S/C002/20 / Consultancy services for Survey, Collection and Multiplication of superior Cricket Bat Willow (Salix Alba Restoration and Under IDA / 56950 Post Direct Selection Direct 128,500.00 0.00 2020-07-21 2020-08-18 2020-07-31 2020-10-04 2021-04-02 var. Caerulea) germplasm for strengthening of livelihoods Implementation livelihood security of farmers and economic sustainability of Cricket Bat Industry of Kashmir Page 6 FEDERAL REPUBLIC OF NIGERIA 18-Months Procurement Plan General: Project Information: Nigeria; REDISSE; P159040. Project Implementation Agency: Nigeria Centre for Disease Control (NCDC) Date of the Procurement Plan: April 2018 Period covered by this Procurement Plan: April 2018 - November, 2019 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers”, July 2016 (Revised November 2017) (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. III. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Nigeria Public Procurement Act 2007 and the Regulations, 2016, such arrangements shall be subject to paragraph 5.3 and 5.4 of the Procurement Regulations and the following conditions: o There should be no mandatory requirements for inclusion of local experts and firms for the consulting assignments; o There should be no exclusive preference based on threshold prescribed in PPA and credit and its Regulations; o Negotiations with the lowest evaluated bidder to reduce price in the case of goods, works and non-consulting services where competitive methods have been used shall not be allowed; 1 o The fixed budget method shall not be used for goods, works and non- consulting services; o Established and approved procurement standards by the government may be used, provided that they are not restrictive When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.4(c) and 5.5 of the Procurement Regulations, the request for bids/request for proposals/request for quotations document shall require that Bidders/Proposers submitting Bids/Proposals/quotations present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. IV. Prequalification: Applicable (May be applicable at the Federal for high value Consultant Assignments V. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable VI. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable VII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Domestic preference is not applicable for National Open Competitive Procurement VIII. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is: Not Applicable IX. Other Relevant Procurement Information: Not Applicable 2 3 X. Threshold for Prior Review, Procurement Approaches and Methods – Goods, Works and Non- Consulting Services Procurement Approaches and Methods (US$ millions) Category Open Open National Request for Quotation International (RfQ) Works, Turnkey, and ≥5 <5 ≤ 0.2 S&I of Plant and Equipment Goods, IT, and non- ≥5 <0.5 ≤ 0.1 consulting services Post Review: All contracts not subject to prior review shall be subject to post review. XI. Summary of the procurement packages for Goods, Works and Non-Consulting Services: Sr. Contract Implem Estima Revie Market Selecti Evaluati Procurem Prequ Domesti Expect Expect No Description enting ted w by Approa on on ent alifica c ed ed date Agency Cost Bank ch Metho Options Process tion Prefere date of (US$) (Prior (Open- d (Most (Single (Yes/ nce of bid/ Contra / Nationa (RFP, Advanta stage- No) (Yes/No propo ct Post) l/ RFB, geous single ) sal Signat Limited RFQ, Bid, envelope openin ure etc.) DS BAFO, etc.) g etc.) Rated Criteria etc.) GOODS 1 Procureme NCDC 3,579,1 Post Open, RFB Most Single No No 08-10- 22-10-18 nt of (AH & 39 National Advanta stage- 18 Vehicles HH) geous single (12 Nos. Bid envelope 4WD DC; 6Nos. 4WD Veterinary Ambulatory vehicle; 4 Nos. 4WD 4 SUVs; 1No. 20Tonnes Truck; 75 Motorcycle and 175 Tricycle 2 Procureme NCDC 198,162 Post Open, RFB Most Single No No 20-03- 10-04-19 nt of Office (AH) National Advanta stage- 19 Equipment geous single & Furniture Bid envelope for 37 state Vet. Public Health /Epidemiolo gy Offices 3 Procureme NCDC 97,377 Post Limited RfQ Rated Single No No 17-09- 01-10-18 nt of (AH) Criteria envelope 18 Laptops and Internet Modem for Surveillanc e activities & Non- Android Phones for animal disease informants 4 Procureme NCDC 926,423 Post Open, RFB Most Single No No 08-10- 22-10-18 nt of Lab. (HH) National Advanta envelope 18 Equipt. , geous Reagents & Bid Consumabl es and Biosecurity Materials (4Lots) 5 Procureme NCDC 295,082 Prior DIR DIR Direct Single No No Nov. Nov. nt of (AH) Selection envelope 2018 2021 5 50000/Vial of ARV Vaccine 6 Procureme NCDC 1,067,8 Post Open, RFB Most Single No No 08-10- 22-10-18 nt of (AH 68 National Advanta envelope 18 Veterinary &HH) geous Stockpiles Bid for preventabl e Zoonotic diseases (AH ) & Consumabl e for HEPR Stockpiling (HH) -2 Lots 7 Procureme NCDC 45,015 Post Limited RfQ Rated Single No No 17-09- 01-10-18 nt of Office (AH) Criteria envelope 18 Furniture/E quipment for Crises Manageme nt Centre (AH) 8 Supply of NCDC 75,374 Post Limited RfQ Rated Single No No 17-09- 01-10-18 Office (AH) Criteria envelope 18 Furniture and Equipment for REDISSE Animal Health Component Office (AH) 9 Printing of NCDC 146,787 Post Limited RfQ Rated Single No No 31-10- 14-11-18 IDSR (HH) Criteria envelope 18 Guideline 10 Printing of NCDC 200,164 Post Limited RfQ Rated Single No No 31-10- 14-11-18 IDSR Tools (HH) Criteria envelope 18 6 (Forms 001,002, 003) 11 Printing of NCDC 36,393 Post Limited RfQ Rated Single No No 31-10- 14-11-18 IDSR Policy (HH) Criteria envelope 18 12 Procureme NCDC 819,672 Post Open, RFB Most Single No No 08-10- 22-10-18 nt of (HH) National Advanta envelope 18 Emergency geous Laboratory Bid reagents and consumable s for NRL/CPHL 13 Procureme NCDC 606,557 Post Open, RFB Most Single No No 08-10- 22-10-18 nt of (HH) National Advanta envelope 18 Consumabl geous e and IPC Bid Materials (HH) 14 Supply of NCDC 68,508 Post Limited RfQ Most Single No No 17-09- 01-10-18 Office (HH) Advanta envelope 18 Furniture geous and Bid Equipment for REDISSE PCU Office - (HH) 15 Procureme NCDC 57,172 Post Limited RfQ Rated Single No No 31-10- 14-11-18 nt of Tabs (HH) Criteria envelope 18 (80), Laptops (35) and 2GB/Month USB Internet Service for step-down training for IDSR for HH 7 16 Supply and NCDC 98,361 Post Limited RfQ Rated Single No No 17-09- 01-10-18 Installation (HH) Criteria envelope 18 of 250 KVA Gen. Set and 20 KVAs Solar Panels and Inverters for REDISSE PCU's Office Total Goods 8,318, 954 WORKS 17 Rehabilitati NCDC 110,16 Post Limited RfQ Rated Single No No 21-01- 04-02-19 on of 7 Nos (AH) 4 Criteria envelope 19 State Veterinary Public Health/Epid emiology offices - NW ZONE ( Kaduna, Katsina, Kano, Jigawa,Keb bi, Zamfara & Sokoto) 18 Rehabilitati NCDC 94,426 Post Limited RfQ Rated Single No No 21-01- 04-02-19 on of 6 Nos. (AH) Criteria envelope 19 State Veterinary Public Health/Epid emiology offices- NE ZONE (Bauchi, Borno, 8 Yobe, Adamawa, Gombe & Taraba) 19 Rehabilitati NCDC 110,16 Post Limited RfQ Rated Single No No 21-01- 04-02-19 on of 7 Nos (AH) 4 Criteria envelope 19 State Veterinary Public Health/Epid emiology offices - NC ZONE ( Plateau, Nasarawa, Benue, Niger, Kogi, Kwara & FCT) 20 Rehabilitati NCDC 94,426 Limited Limited RfQ Rated Single No No 21-01- 04-02-19 on of 6 Nos. (AH) Criteria envelope 19 State Veterinary Public Health/Epid emiology offices - SW ZONE (Osun, Oyo, Ogun, Ondo, Lagos & Ekiti) 21 Rehabilitati NCDC 94,426 Limited Limited RfQ Rated Single No No 21-01- 04-02-19 on of 6 Nos. (AH) Criteria envelope 19 State Veterinary Public Health/Epid emiology 9 offices - SS ZONE ( Edo, Delta, Bayelsa, Rivers, Cross- Rivers & Akwa-Ibom) 22 Rehabilitati NCDC 78,688 Post Limited RfQ Rated Single No No 21-01- 04-02-19 on of 5 Nos. (AH) Criteria envelope 19 State Veterinary Public Health/Epid emiology offices - SE ZONE ( Enugu, Ebonyi, Imo, Anambra & Abia) 23 Refurbishm NCDC 75,374 Post Limited RfQ Rated Single No No 21-01- 04-02-19 ent of (HH) Criteria envelope 19 REDISSE Animal Health component office at Headquarte r 24 Renovation NCDC 114,75 Post Limited RfQ Rated Single No No 21-01- 04-02-19 and (HH) 4 Criteria envelope 19 upgrade of 7 Nos. Isolation Centers in NW ZONE ( Kaduna, Katsina, 10 Kano, Jigawa, Kebbi, Zamfara & Sokoto) 25 Renovation NCDC 98,360 Post Limited RfQ Rated Single No No 21-01- 04-02-19 and (HH) Criteria envelope 19 upgrade of 6 Nos. Isolation Centers in NE ZONE (Bauchi, Borno, Yobe, Adamawa, Gombe & Taraba) 26 Renovation NCDC 114,75 Post Limited RfQ Rated Single No No 21-01- 04-02-19 and (HH) 4 Criteria envelope 19 upgrade of 7 Nos. Isolation Centers in NC ZONE ( Plateau, Nasarawa, Benue, Niger, Kogi, Kwara & FCT) 27 Renovation NCDC 98,360 Post Limited RfQ Rated Single No No 21-01- 04-02-19 and (HH) Criteria envelope 19 upgrade of 6 Nos. Isolation Centers in SW ZONE (Osun, Oyo, Ogun, 11 Ondo, Lagos & Ekiti) 28 Renovation NCDC 98,360 Post Limited RfQ Rated Single No No 21-01- 04-02-19 and (HH) Criteria envelope 19 upgrade of 6 Nos. Isolation Centers in SS ZONE ( Edo, Delta, Bayelsa, Rivers, Cross- Rivers & Akwa-Ibom) 29 Renovation NCDC 81,967 Post Limited RfQ Rated Single No No 21-01- 04-02-19 and (HH) Criteria envelope 19 upgrade of 5 Nos. Isolation Centres in SE ZONE ( Enugu, Ebonyi, Imo, Anambra & Abia) 30 Supply and NCDC 606,55 Post Open, RFB Most Single No No 04-03- 25-03-19 Installation (HH) 7 National Advanta envelope 19 of 1No. geous Incinerator Bid in a selected facilty in each of the six geopolitical zones Total works 1,870, 780 12 NON-CONSULTING SERVICES 31 Registration NCDC (AH) 20,492 Post Limited RfQ Rated Single No No 18-12- 02-10-19 of Criteria envelope 18 motorcycles (75 Nos. ) and tricycle (175 Nos.) for AH 32 Registration NCDC (AH) 266,437 Post Limited RfQ Rated Single No No 18-12- 02-10-19 and Insurance Criteria envelope 18 for 9 Nos. 4WD DC vehicles; 2 Nos. 15- Seater Bus; 6 Nos. 4WD Vet. Ambulatory vehicle; 2 Nos. SUVs; and 1No. 20Tonne Truck for AH 33 Registration NCDC 93,098 Post Limited RfQ Rated Single No No 18-12- 02-10-19 and Insurance (HH) Criteria envelope 18 for 3 Nos. 4WD DC vehicles; 2 Nos. SUVs for HH 34 Installation of NCDC 4,049 Post Limited RfQ Rated Single No No 18-12- 02-10-19 tracking (AH) Criteria envelope 18 systems in 9 Nos. 4WD DC vehicles; 2 Nos. 15- Seater Bus; 6 Nos. 4WD Vet. Ambulatory vehicle; 2 Nos. SUV for AH 35 Installation of NCDC 1,066 Post Limited RfQ Rated Single No No 18-12- 02-10-19 tracking (HH) Criteria envelope 18 systems in 3 Nos. 4WD DC vehicles; 2 Nos. SUV for HH 36 Support for NCDC 16,393 Post Limited RfQ Rated Single No No 18-12- 02-10-19 Distribution of (AH) 18 13 Office logistic Criteria envelope and Lab. Materials to 37 state, NVRI and 10 VTHs 37 Procurement NCDC 142,043 Post Limited RfQ Rated Single No No 18-12- 02-10-19 of courier (HH) Criteria envelope 18 service logistics for specimen transportation and pre- positioning of supplies 38 Recruitment NCDC 45,246 Post Limited RfQ Rated Single No No 17-09- 01-10-18 of 17 (AH) Criteria envelope 18 contract/ad hoc staff (AH) Total Non- 588,82 Consulting 5 Services Note: Based on Liberia’s specific needs and circumstances, shopping threshold for the purchase of vehicles and fuel may be increased up to US$500,000. Thresholds for Prior Review, Selection Approaches and Methods – Consulting Services Category Prior Review Short List of National Consultants (US$ millions) Consulting Engineering and Construction Supervision Services Consultants (Firms) ≥ 0.5 ≤ 0.1 ≤ 0.2 Individual Consultants ≥ 0.2 n.a. n.a. Note: Consultancy services estimated to cost equivalent to US$ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or regional newspaper. XI. Summary of the procurement packages for Consulting Services -Planned for the first 18 months after project effectiveness): 14 Sr. Contract Implem Estimat Revie Market Selection Shortlist Expected Expected No Description enting ed Cost w by Approach Method ing date of date of Agency (US$) Bank (Open - (QCBS, (Yes/ No) bid/ Contract (Prior/ Internation FBS, LCBS, proposal Signature Post) al/ QBS, CQS, opening National/ DS etc.) etc.) 39 Engagement of NCDC 7,026 Post Limited INDV No 15-10-18 29-10-18 Individual Consultants from relevant Sectors to develop a National Strategy for ONE Health and Workforce strategy 40 Recruitment of NCDC 201,836 Prior Open, INDV No 01-10-18 15-10-18 3 Consultants National to support for 12 months to facilitate NCDC-FETP training and lead redesign of the FETP programme 41 Engagement of NCDC 243,934 Prior Open, INDV No 01-10-18 22-10-18 5 Consultants/ National Specialists in relevant Thematic Areas to support Project Implementatio n 42 Consultancy NCDC 197,871 Post Open, CQS No 15-10-18 29-10-18 for Branding National and corporate 15 communication including development of risk communication strategies for the REDISSE project 43 Consultancy to NCDC 66,953 Post Open, CQS No 15-10-18 29-10-18 develop project National website and project intranet including overhaul and upgrade of NCDC website and development of REDISSE webpages 44 Consultancy NCDC 177,540 Post Open, CQS No 18-03-19 01-04-19 for National Establishing, developing, training, and licensing enterprise management of software for Procurement, Audit and Financial management 45 Engagement of NCDC 11,689 Post Limited INDV No 15-10-18 29-10-18 a Consultant to provide Safeguard, Waste Management 16 and Grievance Support 46 Engagement of NCDC 9,797 Post Limited INDV No 20-02-19 06-03-19 2 Individual Consultants to conduct situational analysis and develop a road map for development of laboratory standards 47 Consultancy to NCDC 80,343 Post Open, CQS No 20-02-19 06-03-19 conduct Needs National assessment and consensus building for human and animal health information systems to develop a plan and road map for an interconnected real-time system for human and animal health including a development of a technical plan data systems integration 48 Consultancy NCDC 106,749 Post Open, CQS No 17-04-19 02-05-19 for a National National Public Health Laboratory 17 Needs Assessment 49 Consultancy to NCDC 7,065 post Limited INDV No 20-02-19 06-03-19 develop strategy and training modules on shipment of samples for diagnosis of) zoonotic and epidemic prone diseases 50 Consultancy NCDC 180,343 Post Open, CQS No 17-04-19 02-05-19 for the National assessment of isolation units in all the state capitals in the country to identify gaps compared to global best practice and develop minimum standards for isolation practice 51 Consultancy NCDC 78,220 Post Open, CQS No 17-04-19 02-05-19 for Situational National Analysis and Development of a Multi- hazard Plans 52 Consultancy to NCDC 71,555 Post Open, CQS No 17-04-19 02-05-19 conduct gap National analysis of the existing surveillance 18 system for Transboundary Animal Diseases and zoonotic diseases 53 Consultancy to NCDC 48,355 Post Limited INDV No 15-11-18 29-11-18 conduct the prioritization of TADs and zoonotic diseases. Review and update priority animal diseases TADs 54 Consultancy to NCDC 64,575 Post Open, CQS No 17-04-19 02-05-19 harmonize and National develop guidelines, protocols and tools for animal disease surveillance and disease reporting processes 55 Consultancy to NCDC 14,942 Post Limited INDV No 17-04-19 02-05-19 develop training manual for Surveillance Agents (AH) 56 Consultancy to NCDC 24,104 Post Limited INDV No 17-04-19 02-05-19 identify and develop the GIS Mapping of Hot-spots in human, Wild and Domestic 19 animals interface(AH) 57 Engagement of NCDC 196,721 Post Open, INDV No 15-10-18 29-10-18 25 National Veterinarians as ad hoc staff (AH) 58 Engagement of NCDC 61,967 Post Open, INDV No 15-10-18 29-10-18 10 ad-hoc National Laboratory Scientists at NRL (HH) 59 Consultancy NCDC 56,429 Post Open, CQS No 14-11-18 28-11-18 for re- National assessment of 37 Veterinary Public Health/ Epidemiology offices, preparation of BOQs and Supervision of Rehabilitation 60 Consultancy NCDC 60,656 Post Open, CQS No 14-11-18 28-11-18 for re- National assessment of 37 Isolation Centers, preparation of BOQs and Supervision of renovation Total Consultancy 1,968,6 Services 70 20 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank- financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub- 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 21 contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 22 Title of the person signing the Letter: 23 PROCUREMENT Western Africa : Regional Disease Surveillance Systems Enhancement (REDISSE) Phase II PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-11-20 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159040 GPN Date: Project Name: Regional Disease Surveillance Systems Enhancement (REDISSE) Phase II Loan / Credit No: IDA / 59700 Nigeria Centre for Disease Control Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned REDISSE-CW-RFQ-01 / Rehabilitation of 7 Nos State Veterinary Public Component 1: Surveillance Request for Single Stage - One 2019-08- Health/Epidemiology offices - IDA / 59700 Post Limited 110,164.00 0.00 Canceled 2018-12-25 2019-02-19 and Information Systems Quotations Envelope 18 NW ZONE ( Kaduna, Katsina, Kano, Jigawa,Kebbi, Zamfara & Sokoto) REDISSE-CW-RFQ-02 / Rehabilitation of 6 Nos. State Veterinary Public Component 1: Surveillance Request for Single Stage - One 2019-08- IDA / 59700 Post Limited 94,426.00 0.00 Canceled 2018-12-25 2019-02-19 Health/Epidemiology offices- and Information Systems Quotations Envelope 18 NE ZONE (Bauchi, Borno, Yobe, Adamawa, Gombe & Taraba) REDISSE-CW-RFQ-03 / Rehabilitation of 7 Nos State Veterinary Public Component 1: Surveillance Request for Single Stage - One 2019-08- Health/Epidemiology offices - IDA / 59700 Post Limited 110,164.00 0.00 Canceled 2018-12-25 2019-02-19 and Information Systems Quotations Envelope 18 NC ZONE ( Plateau, Nasarawa, Benue, Niger, Kogi, Kwara & FCT) REDISSE-CW-RFQ-04 / Rehabilitation of 6 Nos. State Veterinary Public Component 1: Surveillance Request for Single Stage - One 2019-08- IDA / 59700 Post Limited 94,426.00 0.00 Canceled 2018-12-25 2019-02-19 Health/Epidemiology offices - and Information Systems Quotations Envelope 18 SW ZONE (Osun, Oyo, Ogun, Ondo, Lagos & Ekiti) REDISSE-CW-RFQ-05 / Rehabilitation of 6 Nos. State Veterinary Public Component 1: Surveillance Request for Single Stage - One 2019-08- Health/Epidemiology offices - IDA / 59700 Post Open - National 94,426.00 0.00 Canceled 2018-12-25 2019-02-19 and Information Systems Quotations Envelope 18 SS ZONE ( Edo, Delta, Bayelsa, Rivers, Cross-Rivers & Akwa- Ibom) REDISSE-CW-RFQ-06 / Rehabilitation of 5 Nos. State Veterinary Public Component 1: Surveillance Request for Single Stage - One 2019-08- IDA / 59700 Post Limited 78,689.00 0.00 Canceled 2018-12-25 2019-02-19 Health/Epidemiology offices - and Information Systems Quotations Envelope 18 SE ZONE ( Enugu, Ebonyi, Imo, Anambra & Abia) REDISSE-CW-RFQ-07F / Component 5: Institutional Pending Refurbishment of REDISSE Capacity Building, Project Request for Single Stage - One 2019-08- IDA / 59700 Post Limited 24,742.00 0.00 Implementat 2018-12-25 2019-02-19 Animal Health component Management, Coordination Quotations Envelope 18 ion office at Headquarter and Advocacy REDISSE-CW-RFQ-08 / Renovation and upgrade of 7 Nos. Isolation Centres in NW Component 3: Preparedness Request for Single Stage - One 2019-08- IDA / 59700 Post Limited 126,230.00 0.00 Canceled 2018-12-25 2019-02-19 ZONE ( Kaduna, Katsina, Kano, and Emergency Response Quotations Envelope 18 Jigawa,Kebbi, Zamfara & Sokoto) REDISSE-CW-RFQ-09 / Renovation and upgrade of 6 Component 3: Preparedness Request for Single Stage - One 2019-08- Nos. Isolation Centres in NE IDA / 59700 Post Limited 108,197.00 0.00 Canceled 2018-12-25 2019-02-19 and Emergency Response Quotations Envelope 18 ZONE (Bauchi, Borno, Yobe, Adamawa, Gombe & Taraba) REDISSE-CW-RFQ-10 / Renovation and upgrade of 7 Nos. Isolation Centres in NC Component 3: Preparedness Request for Single Stage - One 2019-08- IDA / 59700 Post Limited 126,230.00 0.00 Canceled 2018-12-25 2019-02-19 ZONE ( Plateau, Nasarawa, and Emergency Response Quotations Envelope 18 Benue, Niger, Kogi, Kwara & FCT) REDISSE-CW-RFQ-11 / Renovation and upgrade of 6 Component 3: Preparedness Request for Single Stage - One 2019-08- Nos. Isolation Centres in SW IDA / 59700 Post Limited 108,197.00 0.00 Canceled 2018-12-25 2019-02-19 and Emergency Response Quotations Envelope 18 ZONE (Osun, Oyo, Ogun, Ondo, Lagos & Ekiti) REDISSE-CW-RFQ-12 / Renovation and upgrade of 6 Nos. Isolation Centres in SS Component 3: Preparedness Request for Single Stage - One 2019-08- IDA / 59700 Post Open - National 108,197.00 0.00 Canceled 2018-12-25 2019-02-19 ZONE ( Edo, Delta, Bayelsa, and Emergency Response Quotations Envelope 18 Rivers, Cross-Rivers & Akwa- Ibom) REDISSE-CW-RFQ-13 / Renovation and upgrade of 6 Nos. Isolation Centres in SS Component 3: Preparedness Request for Single Stage - One 2019-08- IDA / 59700 Post Limited 108,197.00 0.00 Canceled 2018-12-25 2019-02-19 ZONE ( Edo, Delta, Bayelsa, and Emergency Response Quotations Envelope 18 Rivers, Cross Rivers and Akwa Ibom) - HH REDISE-CW-RFQ-14 / Component 5: Institutional Pending Refurbishment of Redisse Capacity Building, Project Request for Single Stage - One 2019-07- IDA / 59700 Post Limited 24,742.00 0.00 Implementat 2018-12-03 2019-01-28 Animal Health Component Management, Coordination Quotations Envelope 27 ion Oficce at Headquarter and Advocacy Page 1 Component 5: Institutional REDISSE-CW-RFQ-15 / Office Capacity Building, Project Request for Single Stage - One 2019-11- partitioning REDISSE PCU IDA / 59700 Post Limited 10,557.38 9,320.47 Completed 2019-03-11 2019-02-25 2019-05-06 2019-03-04 Management, Coordination Quotations Envelope 02 Office and Advocacy REDISSE-CW-RFQ-01-2020 / Component 5: Institutional Pending Rehabilitate 36 State office Capacity Building, Project Request for Single Stage - One 2021-07- IDA / 59700 Post Limited 1,496,843.00 0.00 Implementat 2020-11-23 2021-01-18 accommodation and FCT (6 Management, Coordination Quotations Envelope 17 ion LOTS) and Advocacy GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual REDISSE-GDS-RFB-02 / Procurement of Office Component 1: Surveillance Single Stage - One Equipment & Furniture for 37 IDA / 59700 Post Request for Bids Open - National 146,787.00 0.00 Canceled 2018-10-16 2018-10-21 2018-12-02 2019-01-01 2019-02-05 2019-08-04 and Information Systems Envelope state Vet. Public Health /Epidimeology Offices REDISSE-GDS-RFQ-01 / Procurement of Laptops and Internet Modem etc for Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 110,738.00 0.00 Canceled 2018-08-04 2018-09-29 2019-03-28 Surveillance activities & Non- and Information Systems Quotations Envelope Android Phones for animal disease informants REDISSE-GDS-RFB-04 / Procurement of Vetinary Stockpiles for preventable Component 3: Preparedness Single Stage - One IDA / 59700 Post Request for Bids Open - National 994,099.00 508,823.27 Signed 2018-10-16 2019-10-18 2018-10-21 2018-12-02 2019-11-18 2019-01-01 2020-01-03 2019-02-05 2020-01-27 2019-08-04 2020-07-01 Zoonotic diseases (AH ) & and Emergency Response Envelope Consumable for HEPR Stockpiling (HH) -2 Lots REDISSE-GDS-RFQ-3 / Procurement of Office Pending Component 3: Preparedness Request for Single Stage - One Furniture/Equipment for IDA / 59700 Post Limited 41,896.00 0.00 Implementati 2018-10-14 2018-12-09 2019-06-07 and Emergency Response Quotations Envelope Crises Management Centre on (AH) REDISSE-GDS-RFQ-04 / Component 5: Institutional Pending Supply of Office Furniture and Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 33,144.00 0.00 Implementati 2018-10-14 2018-12-09 2019-06-07 Equipment for REDISSE Animal Management, Coordination Quotations Envelope on Health Component Office and Advocacy REDISSE-GDS-RFQ-05 / Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 146,787.00 0.00 Canceled 2018-11-20 2019-01-15 2019-07-14 Printing of IDSR Guideline and Information Systems Quotations Envelope REDISSE-GDS-RFQ-06 / Component 1: Surveillance Request for Single Stage - One Printing of IDSR Tools (Forms IDA / 59700 Post Limited 200,164.00 0.00 Canceled 2018-11-20 2019-01-15 2019-07-14 and Information Systems Quotations Envelope 001,002, 003) REDISSE-GDS-RFQ-07 / Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 36,393.00 0.00 Canceled 2018-11-20 2019-01-15 2019-07-14 Printing of IDSR Policy and Information Systems Quotations Envelope REDISSE-GDS-RFB-05 / Pending Procurement of Emergency Component 2: Strengthening Single Stage - One IDA / 59700 Post Request for Bids Open - National 819,672.00 0.00 Implementati 2018-10-16 2018-10-21 2018-12-02 2019-01-01 2019-02-05 2019-08-04 Laboratory reagents and of Laboratory Capacity Envelope on consummables for NRL/CPHL REDISSE-GDS-RFB-06 / Supply and Installation of 6 Component 3: Preparedness Single Stage - One IDA / 59700 Post Request for Bids Open - National 590,164.00 0.00 Canceled 2018-11-07 2018-11-12 2018-12-24 2019-01-23 2019-02-27 2019-08-26 Incinerators in one facility of and Emergency Response Envelope each of the geopolical zone REDISSE-GDS-RFB-07 / Pending Component 3: Preparedness Single Stage - One Procurement of Consummable IDA / 59700 Post Request for Bids Open - National 608,197.00 0.00 Implementati 2018-11-07 2018-11-12 2018-12-24 2019-01-23 2019-02-27 2019-08-26 and Emergency Response Envelope and IPC Materials (HH) on REDISSE-GDS-RFQ-09 / Procurement of Tabs (80), Component 1: Surveillance Request for Single Stage - One Laptops (35) and 2GB/Month IDA / 59700 Post Limited 57,172.00 0.00 Canceled 2018-10-14 2018-12-09 2019-06-07 and Information Systems Quotations Envelope USB Internet Service for step- down training for IDSR for HH REDISSE-GDS-RFQ-10 / Component 5: Institutional Supply and Installation od 250 Pending Capacity Building, Project Single Stage - One KVA Gen. Set and 20 KVAs IDA / 59700 Post Request for Bids Open - National 147,541.00 0.00 Implementati 2018-10-09 2018-10-14 2018-11-25 2018-12-25 2019-01-29 2019-07-28 Management, Coordination Envelope Solar Panels and Inverters for on and Advocacy REDISSE PCU's Office REDISSE-GDS-RFQ-16 / Component 5: Institutional Pending Support for fueling of vehicles Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 7,790.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 and generators (6600ltrs AGO Management, Coordination Quotations Envelope on & 6600 PMS) -AH and Advocacy Component 4: Human REDISSE-GDS-RFQ-17 / Pending Resource Management for Request for Single Stage - One Support for alternative source IDA / 59700 Post Limited 72,131.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 Effective Disease Surveillance Quotations Envelope of power -AH on and Epidemic Preparedness Component 5: Institutional REDISSE-GDS-RFQ-18 / Pending Capacity Building, Project Request for Single Stage - One Support for Office Supplies- IDA / 59700 Post Limited 26,097.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 Management, Coordination Quotations Envelope AH on and Advocacy REDISSE-GDS-RFB-01 / Procurement of Vehicles-12 Nos. 4WD DC, 6Nos. 4WD Pending Component 1: Surveillance Single Stage - One Ambulance, 4 Nos. 4WD IDA / 59700 Post Request for Bids Open - National 3,261,517.00 0.00 Implementati 2018-10-16 2018-10-21 2018-12-02 2019-01-01 2019-02-05 2019-08-04 and Information Systems Envelope SUVs, 75 Motorcycles and 175 on Tricycles and 2Nos. 15- seater bus - AH &HH REDISSE-GDS-DIR-1 / Pending Procurement of 200,000 Component 2: Strengthening IDA / 59700 Post Direct Selection Direct 295,082.00 0.00 Implementati 2019-01-16 2019-01-21 2019-02-25 2019-08-24 doses/vials of anti-rabies of Laboratory Capacity on vaccines (ARV) Page 2 REDISSE-GDS-RFQ-13 / Procurement of Equipment for Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 139,036.99 119,502.36 Completed 2019-02-09 2019-03-08 2019-04-06 2019-06-17 2019-10-03 2019-09-17 Molecular Diagnostic of Laboratory Capacity Quotations Envelope Laboratory REDISSE-GDS-RFQ-14 / Procurement of Laboratory Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 183,900.62 166,291.48 Completed 2019-02-09 2019-03-11 2019-04-06 2019-06-17 2019-10-03 2019-09-10 Reagents for LF Emergency of Laboratory Capacity Quotations Envelope Response REDISSE-GDS-RFQ-15 / Procurement of consumables Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 92,694.42 59,391.08 Completed 2019-02-09 2019-03-12 2019-04-06 2019-06-17 2019-10-03 2019-10-10 for Rapid Diagnosis of Lassa of Laboratory Capacity Quotations Envelope Fever Emmergency Response NG-NCDC-98247-GO-RFQ / Printing of National Guidelines Component 3: Preparedness Request for Single Stage - One on Case Management of LF IDA / 59700 Post Limited 37,615.50 27,999.97 Completed 2019-02-09 2019-11-01 2019-04-06 2020-02-11 2019-10-03 2020-02-27 and Emergency Response Quotations Envelope and IPC for VHFs for the Lassa Fever Emergency Response NG-NCDC-98248-GO-RFQ / Procurement of Injectable Component 2: Strengthening Ribavirin for Lassa Fever IDA / 59700 Post Direct Selection Direct 459,177.05 386,075.88 Completed 2019-02-04 2019-01-21 2019-02-09 2019-01-21 2019-03-16 2019-01-31 2019-09-12 2019-02-04 of Laboratory Capacity Emergency Response (200mg/2ml) NG-NCDC-98250-GO-RFQ / Pending Procurement of Ribavirin Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 24,786.88 0.00 Implementati 2019-02-09 2019-04-06 2019-10-03 Tablets for LF Emergency of Laboratory Capacity Quotations Envelope on Response Component 5: Institutional REDISSE-GDS-RFQ-08 / Capacity Building, Project Request for Single Stage - One Supply of Office Furniture for IDA / 59700 Post Limited 113,732.00 73,847.60 Completed 2019-03-16 2019-02-21 2019-05-11 2019-03-15 2019-11-07 2019-04-25 Management, Coordination Quotations Envelope REDISSE PCU Office-(HH) and Advocacy NG-NCDC-104619-GO-RFQ Component 5: Institutional / Office Equipment and IT Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 83,253.75 49,708.76 Signed 2019-03-16 2019-02-25 2019-05-11 2019-03-20 2019-11-07 2019-04-30 Equipment - REDISSE PCU Management, Coordination Quotations Envelope Office and Advocacy NG-NCDC-105950-GO-RFQ Component 5: Institutional Pending / Set up Project intranet Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 56,882.00 0.00 Implementati 2019-04-03 2019-05-29 2019-11-25 including overhaul and Management, Coordination Quotations Envelope on upgrade of NCDC website and Advocacy NG-NCDC-111659-GO-RFQ / Emergency Procurement - Procure 2000 ltrs Pending Component 2: Strengthening Request for Single Stage - One disinfectants CID and 1000 IDA / 59700 Post Limited 276,229.50 0.00 Implementati 2019-05-16 2019-07-11 2020-01-07 of Laboratory Capacity Quotations Envelope ltrs 20 percent alcohol, 185 on motorized sprayers, 500 bio- security kits NG-NCDC-111690-GO-RFQ Pending / Emergency procurement of Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 188,776.00 0.00 Implementati 2019-05-12 2019-07-07 2020-01-03 Animal Health laboratory of Laboratory Capacity Quotations Envelope on consumables and equipment NG-NCDC-142564-GO-RFQ / Procurement of Laboratory Pending Component 2: Strengthening Request for Single Stage - One Equipments, Reagents and IDA / 59700 Post Limited 129,808.94 0.00 Implementati 2019-11-02 2019-12-28 2020-06-25 of Laboratory Capacity Quotations Envelope Consumables for NVRI Lab. on VOM NG-NCDC-142566-GO-RFQ Pending Component 3: Preparedness Request for Single Stage - One / Procurement of Vaccination IDA / 59700 Post Limited 27,505.36 0.00 Implementati 2019-11-01 2019-12-27 2020-06-24 and Emergency Response Quotations Envelope campaign materials on NG-NCDC-142568-GO-RFQ / Procurement of Dog Pending Component 3: Preparedness Request for Single Stage - One Collar/Medals/Card and flyers IDA / 59700 Post Limited 56,909.84 0.00 Implementati 2019-11-02 2019-12-28 2020-06-25 and Emergency Response Quotations Envelope for Anti-Rabies outbreak on campaign in four (4) states NG-NCDC-142570-GO-RFQ / Registration of 12 nos of 4 x 4 Toyota Hilux pick-ups, 2 nos. 2 x 2 Toyota High roof Component 5: Institutional Pending buses, 4 nos. 4 x 4 Toyota Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 24,262.00 0.00 Implementati 2019-11-03 2019-12-29 2020-06-26 Fortuner, 5 nos. 4 x 4 Management, Coordination Quotations Envelope on Veterinary Ambulatory Toyota and Advocacy vehicles, 175 nos. Tricycles and 75 nos. Royal Motorcycles. NG-NCDC-142573-GO-RFQ Component 5: Institutional / Insurance of project vehicles Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 236,027.09 45,989.81 Completed 2019-10-29 2019-11-01 2019-12-24 2019-12-13 2020-06-21 2019-12-17 - 23 Motor vehicles, 175 Management, Coordination Quotations Envelope Tricycles and 75 Motor Cycles. and Advocacy NG-NCDC-142577-GO-RFQ Component 5: Institutional / Vehicular Movement Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 7,540.98 2,518.49 Completed 2019-10-29 2019-11-04 2019-12-24 2019-12-13 2020-06-21 2019-12-16 Tracking Devices for Project Management, Coordination Quotations Envelope Vehicles and Advocacy NG-NCDC-147224-GO-RFQ / Procurement of Under Commercially Available Yellow Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 166,854.43 105,105.89 Implementati 2019-12-02 2019-12-05 2020-01-27 2020-07-25 Fever Reagents and of Laboratory Capacity Quotations Envelope on Commodities for Yellow Fever Laboratory Network. NG-NCDC-147233-GO-RFQ Component 4: Human Under / Procurement of 48 Laptop Resource Management for Request for Single Stage - One IDA / 59700 Post Limited 40,885.25 34,848.87 Implementati 2019-12-03 2019-12-10 2020-01-28 2020-07-26 Computers for NFELTP and Effective Disease Surveillance Quotations Envelope on SORMAS training and Epidemic Preparedness Page 3 NG-NCDC-142569-GO-DIR / Procurement of Anti-Rabies Pending Component 3: Preparedness Vaccines for outbreak IDA / 59700 Post Direct Selection Direct 206,655.74 0.00 Implementati 2019-11-27 2019-12-02 2020-01-06 2020-07-04 and Emergency Response campaign in Bauchi, Bayelsa, on Ekiti and Plateau States REDISSE-GDS-RFQ -02-2020 / Emergency Procurement of Pending Component 3: Preparedness Request for Investigation and Case IDA / 59700 Post 249,838.00 0.00 Implementati 2020-03-05 2020-03-05 2020-03-05 and Emergency Response Quotations Management Consumable - 2 on Lots REDISSE-GDS-RFQ -03-2020 / Emergency Procurement of COVID-19 Sample Pippetting , Pending Component 3: Preparedness Request for Sample Collection, Waste IDA / 59700 Post 140,416.00 0.00 Implementati 2020-03-06 2020-03-06 2020-03-06 and Emergency Response Quotations Management and PCR Test on Laboratory Consumables - 4 Lots REDISSE-GDS-RFQ -04-2020 / Emergency Procurement of Pending COVID-19 Laboratory Component 3: Preparedness Request for IDA / 59700 Post 263,711.00 0.00 Implementati 2020-03-13 2020-03-13 2020-03-13 Reagents for: PCR Diagnosis; and Emergency Response Quotations on Sequencing; and Multiplex Diagnosis. REDISSE-GDS-RFQ -05-2020 Under / Emergency Procurement of Component 3: Preparedness Request for IDA / 59700 Post 222,364.00 174,500.24 Implementati 2020-03-13 2020-03-13 2020-03-13 COVID-19 Laboratory and Emergency Response Quotations on Equipment: A)PCR Equipment REDISSE-GDS-RFQ -06-2020 / Emergency Procurement of Component 3: Preparedness Request for COVID-19 Laboratory IDA / 59700 Post 446,166.00 344,999.66 Completed 2020-03-13 2020-03-13 2020-03-24 2020-03-13 2020-06-04 and Emergency Response Quotations Equipment: A) Multiplex Equipment REDISSE-GDS-RFQ -07-2020 / Emergency Additional Procurement of COVID-19 Pending Component 3: Preparedness Request for and Lassa Fever Laboratory IDA / 59700 Post 124,162.00 0.00 Implementati 2020-03-23 2020-03-23 2020-03-23 and Emergency Response Quotations Reagents for: PCR Diagnosis; on Sequencing; and Multiplex Diagnosis. REDISSE-GDS-RFQ -08-2020 / Emergency Additional Pending Component 3: Preparedness Request for Procurement of COVID-19 IDA / 59700 Post 236,111.00 0.00 Implementati 2020-03-23 2020-03-23 2020-03-23 and Emergency Response Quotations and Lassa Fever Laboratory on PCR and Multiplex Equipment REDISSE-GDS-RFQ -09-2020 / Supply and Installation of Gen. set and Inverter in 10 Component 5: Institutional Emergency Operation Centres Capacity Building, Project Request for IDA / 59700 Post 555,555.00 122,967.55 Signed 2020-03-23 2020-03-23 2020-04-23 2020-03-23 (EOCs) at states level to Management, Coordination Quotations ugment Power supply from and Advocacy National Electricity Grid - 2 Lots REDISSE-GDS-RFQ -10-2020 / Supply and Installation of Component 1: Surveillance Request for ICT in 10 Emergency IDA / 59700 Post 416,666.00 414,798.24 Signed 2020-03-23 2020-03-23 2021-03-05 2020-03-23 and Information Systems Quotations Operation Centres (EOCs) at states level REDISSE-GDS-RFQ -11-2020 / Procurement of 20 no. of 4x4 DC Pick-ups for EOCs rapid response and Component 3: Preparedness Request for monitoring across states and IDA / 59700 Post 1,050,000.00 1,121,934.56 Completed 2020-03-23 2020-03-23 2020-04-03 2020-03-23 2020-04-09 and Emergency Response Quotations 1 no. additional 4x4 Pick-up for M&E at the REDISSE PCU (to be procured through acredited/frontline dealers). REDISSE-GDS-RFQ -12-2020 / Construction of new 5 nos. Component 5: Institutional Under of 40-bed carrying space Capacity Building, Project Request for IDA / 59700 Post 1,944,444.00 0.00 Implementati 2020-04-02 2020-04-02 2020-04-02 Isolation /Treatment Centres Management, Coordination Quotations on at Kano, Kwara, Rivers, Lagos and Advocacy and Enugu states - 5 Lots REDISSE-CW-RFQ -01-2020 / Renovation of 2 nos. of Component 5: Institutional Pending existing Isolation/Treatment Capacity Building, Project Request for IDA / 59700 Post 277,777.00 0.00 Implementati 2020-03-23 2020-03-23 2020-03-23 Centres at Iberekodo General Management, Coordination Quotations on Hospital (Ogun state) & one and Advocacy other site - 2 Lots REDISSE-GDS-RFQ -13-2020 / Procurement of Equipment Pending for 2 nos. of renovated Component 3: Preparedness Request for IDA / 59700 Post 555,555.00 0.00 Implementati 2020-03-23 2020-03-23 2020-03-23 Isolation/Treatment Centres and Emergency Response Quotations on at Iberekodo General Hospital (Ogun state) and one other REDISSE-GDS-RFQ -14-2020 / Procurement of 15 nos. fully equipped Ambulances Pending Component 3: Preparedness Request for for Isolation/treatment IDA / 59700 Post 1,041,667.00 0.00 Implementati 2020-03-23 2020-03-23 2020-03-23 and Emergency Response Quotations centres (7nos); International on airpts(5nos); FMoH (1no.); and Ogun state (2nos). REDISSE-GDS-RFQ -15-2020 / Procurement & installation Component 5: Institutional of one Dialysis Machine each Capacity Building, Project Request for for Lassa Fever treatment IDA / 59700 Post 208,333.00 198,311.49 Signed 2020-03-23 2020-03-23 2020-07-29 2020-03-23 Management, Coordination Quotations Centre at Irrua, Owo and and Advocacy Abakaliki (3 nos. of Dialysis Machines). Page 4 REDISSE-GDS-RFQ -16-2020 / Procurement of Equipment Pending for 5 nos. newly constructed Component 3: Preparedness Request for IDA / 59700 Post 1,388,889.00 0.00 Implementati 2020-04-02 2020-04-02 2020-04-02 Isolation/Treatment Centres and Emergency Response Quotations on at Kano, Kwara, Rivers, Lagos and Enugu states - 5 Lots REDISSE-GDS-DIR -01-2020 / Procurement of 20 computers, 20 Head-phones and 20 Electric Extension Wire Component 1: Surveillance for Surveillance - Call Centre; IDA / 59700 Post Direct Selection Direct 60,168.00 52,578.51 Completed 2020-03-23 2020-02-23 2020-03-28 2020-02-28 2020-05-02 2020-03-19 2020-10-29 2020-04-06 and Information Systems plus 20 Laptops for NRL Laboratory Adhoc Staff + Data manager; 2 Printers; 5 Toner catridges; and 5InK REDISSE-GDS-DIR -03-2020 Pending Component 2: Strengthening / Procurement of additional IDA / 59700 Post Direct Selection Direct 357,894.00 0.00 Implementati 2020-04-02 2020-04-07 2020-05-12 2020-11-08 of Laboratory Capacity 20,000 PPEs Coverals - 1 Lot on REDISSE-GDS-RFQ -17- 2020 Pending / Procurement of additional Component 2: Strengthening Request for IDA / 59700 Post 271,934.00 0.00 Implementati 2020-04-02 2020-04-02 2020-04-02 Infection, Prevention Controls of Laboratory Capacity Quotations on Accessories - 1 Lot REDISSE-GDS-DIR -04-2020 / Provision Internet Under Infrastructure and Networking Component 1: Surveillance IDA / 59700 Post Direct Selection Direct 77,354.00 80,133.51 Implementati 2020-04-02 2020-03-26 2020-04-07 2020-03-20 2020-05-12 2020-11-08 of NCDC Annex Building and Information Systems on (Housing the REDISSE Project) -1 Lot REDISSE-GDS-RFQ -18- 2020 / Procurement of Disinfectants and veterinary stockpiles for the Component 3: Preparedness Request for containtment of outbreak of IDA / 59700 Post 532,508.00 502,892.77 Signed 2020-04-02 2020-04-02 2020-04-27 2020-04-02 and Emergency Response Quotations African Swine Fever (ASF) - 3 Lots: Lot A: Disinfectants; Lot B: PPEs; Lot C: Motorized Sprayers REDISSE-GDS-RFQ -01-2020 / Emergency Procurement of Component 3: Preparedness Request for Personal Protective Equipment IDA / 59700 Post 203,922.00 165,605.23 Completed 2020-03-05 2020-03-05 2020-03-12 2020-03-05 2020-03-18 and Emergency Response Quotations (PPEs) - 12,000 pcs of Coveralls - 1 Lot REDISSE-GDS-DIR-05-2020 / Procurement of Insurance Component 5: Institutional Policies for 20 Nos New Pending Capacity Building, Project Vehicles for EOC's at state IDA / 59700 Post Direct Selection Direct 44,930.00 0.00 Implementati 2020-05-27 2020-06-01 2020-07-06 2021-01-02 Management, Coordination level and 1 nos new vehicle on and Advocacy for monitoring and evaluation at the PCU. REDISSE-GDS-RFQ-19-2020 / Procurement of 44,000 pieces of Coverall (white Component 3: Preparedness Request for Single Stage - One Tyvek, with elastic wrists, IDA / 59700 Post Limited 863,333.00 812,637.17 Completed 2020-07-04 2020-07-09 2020-08-29 2020-07-28 2021-02-25 2020-10-30 and Emergency Response Quotations Envelope ankles and hood, Hidden zipper, Disposable) for 36 states plus FCT REDISSE-GDS-RFQ-20-2020 / Procurement of 88,800 units of Protective gowns full sleeve Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 1,089,444.00 1,028,414.89 Completed 2020-07-04 2020-07-09 2020-08-29 2020-07-28 2021-02-25 2020-09-14 (Water resistant & pack of 10) and Emergency Response Quotations Envelope and 37,000 units of Hood for 36 states plus FCT REDISSE-GDS-RFQ-21-2020 / Procurement of 48,100 units of Protective goggles (grey Component 3: Preparedness Request for Single Stage - One plastic frame with clear lens, IDA / 59700 Post Limited 521,083.00 466,121.30 Completed 2020-07-04 2020-07-09 2020-08-29 2020-07-28 2021-02-25 2020-08-27 and Emergency Response Quotations Envelope With adjustable head band, disposable) for 36 states plus FCT REDISSE-GDS-RFQ-22-2020 / Procurement of 48,100 units Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 374,111.00 351,426.95 Completed 2020-07-04 2020-07-09 2020-08-29 2020-07-28 2021-02-25 2020-09-10 of Face shield (disposable) for and Emergency Response Quotations Envelope 36 states plus FCT REDISSE-GDS-RFQ-23-2020 / Procurement of 16,428 units of Examination gloves without powder size small, ambidextrous, Nitrile non- Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 213,367.00 187,748.22 Completed 2020-07-04 2020-07-10 2020-08-29 2020-07-28 2021-02-25 2020-10-19 sterile, disposable. (box of and Emergency Response Quotations Envelope 100) , 14,800 pairs of Gloves surgical, (size 8.5) and 3700 pairs of Heavy duty rubber gloves for 36 states plus FCT REDISSE-GDS-RFQ-24-2020 / Procurement of 18,500 units of Heavy duty non-woven apron, 5,180 pieces of Scrubs (Tunic XL, L), 5180 Pieces of Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 210,489.00 192,047.97 Completed 2020-07-04 2020-07-09 2020-08-29 2020-07-28 2021-02-25 2020-09-30 Scrubs (Trousers XL, L) and and Emergency Response Quotations Envelope 193,140 pairs of Boot cover, high model (45cm, white, 50gm/m2 SMS, disposable) for the 36 states plus FCT REDISSE-GDS-RFQ-25-2020 / Procurement of 237,140 Component 3: Preparedness Request for Single Stage - One units of Face mask, particulate IDA / 59700 Post Limited 1,319,667.00 1,218,196.32 Completed 2020-07-04 2020-07-09 2020-08-29 2020-07-28 2021-02-25 2020-08-27 and Emergency Response Quotations Envelope respirator (grade N95) for 36 states plus FCT Page 5 REDISSE-GDS-RFQ-26-2020 / Procurement of 592 Boxes of Sharps container boxes, 1,480 pieces of Body bag, Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 151,289.00 142,809.22 Completed 2020-07-04 2020-07-16 2020-08-29 2020-07-29 2021-02-25 2020-08-19 2,220 pairs of Rubber BOOTS and Emergency Response Quotations Envelope and 148,000 pieces of Biohazard bag (100 l) for the 36 States plus FCT REDISSE-GDS-RFQ-27-2020 / Procurement of 7,400 pieces of Digital THERMO SCANS with batteries, 740 Pieces of Infrared digital Thermometer, Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 164,856.00 155,893.92 Completed 2020-07-04 2020-07-14 2020-08-29 2020-07-29 2021-02-25 2020-08-24 74,000 pieces of Hand and Emergency Response Quotations Envelope sanitizer gel, 1665 KG of Chlorine, and 1,850 units of Sodium Hypochlorite for the 36 states plus FCT REDISSE-GDS-RFQ-28-2020 / Procurement of 370 pieces of Bucket with tap, 222 pieces of Mopping bucket with sticks, 2,220 pieces of 1Kg Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 72,458.00 75,277.76 Completed 2020-07-04 2020-07-10 2020-08-29 2020-07-28 2021-02-25 2020-08-18 Detergent, 14,800 Containers and Emergency Response Quotations Envelope of Liquid soap, 222 pieces of Backpack sprayer, and 370 pieces of Waste bin colour for the 36 States plus FCT REDISSE-GDS-RFQ-29-2020 Component 2: Strengthening Request for Single Stage - One / Emergency Procurement of IDA / 59700 Prior Limited 860,213.00 0.00 Canceled 2020-08-10 2020-10-05 2021-04-03 of Laboratory Capacity Quotations Envelope PCR RNA Extraction Kit REDISSE-GDS-RFQ-30-2020 / Procurement of Laptop Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 350,000.00 327,522.11 Signed 2020-08-15 2020-07-24 2020-10-10 2020-08-07 2021-04-08 Computers and Tablets for and Information Systems Quotations Envelope SORMAS Training - 2 lots REDISSE-GDS-DIR-06-2020 / Under Component 2: Strengthening Emergency Procurement of IDA / 59700 Prior Direct Selection Direct 860,213.00 0.00 Implementati 2020-08-24 2020-08-29 2020-10-03 2021-04-01 of Laboratory Capacity PCR RNA Extraction Kit. on REDISSE-GDS-RFQ-32-2020 Component 3: Preparedness Request for Single Stage - One / Supply and Installation of IDA / 59700 Post Limited 7,527.00 7,431.57 Completed 2020-10-10 2020-07-20 2020-12-05 2020-07-29 2021-06-03 2020-08-14 and Emergency Response Quotations Envelope Fire Extinguisher REDISSE-GDS-RFQ-33-2020 / Supply, Delivery and Component 3: Preparedness Request for Single Stage - One Installation of additional 27 IDA / 59700 Post Limited 405,405.00 310,945.42 Completed 2020-10-10 2020-08-25 2020-12-05 2020-10-19 2021-06-03 2020-12-03 and Emergency Response Quotations Envelope Generating sets for States - emergency procurement REDISSE-GDS-RFQ-38-2020 / Procure mobile phones, Component 5: Institutional Under recharge cards, and internet Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 29,224.00 42,875.97 Implementati 2020-10-10 2020-12-09 2020-12-05 2021-06-03 for Project staff, Heads of Management, Coordination Quotations Envelope on Divisions in DVPCS _ FMARD and Advocacy project ad -hoc staff REDISSE-GDS-RFQ-42-2020 Pending / Procure 11 KVA Solar Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 130,264.00 0.00 Implementati 2020-10-24 2020-12-19 2021-06-17 system for 11 Nos NVRI of Laboratory Capacity Quotations Envelope on laboratory outstations REDISSE-GDS-DIR-08-2020 / Procure 2000500 doses anti Under rabies vaccines using single Component 3: Preparedness IDA / 59700 Prior Direct Selection Direct 2,105,790.00 0.00 Implementati 2020-10-26 2020-10-31 2020-12-05 2021-06-03 source method, to suppport and Emergency Response on high risk states in the control of rabies outbreaks Component 5: Institutional REDISSE-GDS-RFQ-53-2020 Pending Capacity Building, Project Request for Single Stage - One / Logistics and utilities IDA / 59700 Post Limited 24,474.00 0.00 Implementati 2020-11-14 2021-01-09 2021-07-08 Management, Coordination Quotations Envelope support to DVPCS on and Advocacy REDISSE-GDS-RFQ-45-2020 / Production of Pending Component 3: Preparedness Request for Single Stage - One radio/television jiggles for IDA / 59700 Post Limited 13,158.00 0.00 Implementati 2020-10-31 2020-12-26 2021-06-24 and Emergency Response Quotations Envelope anti-rabies vaccination on campaign REDISSE-GDS-RFQ-47-2020 Component 5: Institutional Pending / Installation of tracking Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 3,553.00 0.00 Implementati 2020-11-07 2021-01-02 2021-07-01 device on vehicles purchased Management, Coordination Quotations Envelope on by AHS and Advocacy Component 5: Institutional REDISSE-GDS-RFQ-51-2020 Pending Capacity Building, Project Request for Single Stage - One / Provide Internet Services for IDA / 59700 Post Limited 2,527.00 0.00 Implementati 2020-11-07 2021-01-02 2021-07-01 Management, Coordination Quotations Envelope the Animal Health Sector on and Advocacy REDISSE-GDS-RFQ-31-2020 / Supply and Installation of Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 39,474.00 36,709.06 Completed 2020-11-23 2020-08-07 2021-01-18 2020-08-12 2021-07-17 2020-08-31 Video Conferencing and Information Systems Quotations Envelope Equipment for REDISSE Project REDISSE-GDS-RFQ-35-2020 Component 5: Institutional / Procurement of mobile Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 25,810.00 17,944.05 Completed 2020-11-23 2020-05-28 2021-01-18 2020-06-01 2021-07-17 2020-06-08 phones and Accessories for Management, Coordination Quotations Envelope HHS Project Staff and Advocacy REDISSE-GDS-RFQ-41-2020 / Procurement of 91 Laptops, Component 5: Institutional 49 Tablets & Accessories, 6 Capacity Building, Project Request for Single Stage - One nos 3 in 1 Photocopier and IDA / 59700 Post Limited 294,451.00 0.00 Canceled 2020-11-23 2021-01-18 2021-07-17 Management, Coordination Quotations Envelope Office Logistics/Maintenance and Advocacy for Human Health Sector - 3 Lots Page 6 REDISSE-GDS-RFQ-36-2020 Pending / Procurement of Laboratory Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 565,240.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 Reagents, Consumables and of Laboratory Capacity Quotations Envelope on Equipments - 3 Lots REDISSE-GDS-RFQ-37-2020 / Procure basic passive Pending disease surveillance materials Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 230,193.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 for 36 States and the FCT in and Information Systems Quotations Envelope on line with PVS recommendations. REDISSE-GDS-RFQ-46-2020 Component 5: Institutional / Procurement of office tables, Pending Capacity Building, Project Request for Single Stage - One chairs, projector, all-in-one IDA / 59700 Post Limited 152,577.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 Management, Coordination Quotations Envelope printer and generator for on and Advocacy States REDISSE-GDS-RFQ-52-2020 Component 5: Institutional Pending / Procure office refreshment Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 18,208.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 consumables and utensils for Management, Coordination Quotations Envelope on AHS and Advocacy REDISSE-GDS-RFB-01-2020 / Procurement of 78 Project Vehicles; 52 nos. 4x4 double Pending cabin,15 nos. 2x2 Hospital Component 1: Surveillance Single Stage - One IDA / 59700 Post Request for Bids Open - National 5,404,826.00 0.00 Implementati 2020-10-19 2020-10-24 2020-12-05 2021-01-04 2021-02-08 2021-08-07 Ambulances, 7 nos. 4x4 and Information Systems Envelope on Veterinary Ambulatory vehicles, 3 nos. 2x2WD Bus, 1 nos 4X4 SUV REDISSE-GDS-RFQ-55-2020 Component 5: Institutional / Procurement of 110 Laptops Pending Capacity Building, Project Request for Single Stage - One and Accessories; 25nos. 3in1 IDA / 59700 Post Limited 203,271.00 0.00 Implementati 2020-12-12 2021-02-06 2021-08-05 Management, Coordination Quotations Envelope Photocopier and 35 nos. on and Advocacy Toners - 2 Lots REDISSE-GDS-RFQ-40-2020 Pending / Procurement of laboratory Component 2: Strengthening Request for Single Stage - One IDA / 59700 Post Limited 237,844.00 0.00 Implementati 2020-10-24 2020-12-19 2021-06-17 reagents for NVRI and VTH of Laboratory Capacity Quotations Envelope on labs REDISSE-GDS-RFQ-43-2020 Pending / Procurement of Anti-Rabies Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 301,104.00 0.00 Implementati 2020-10-31 2020-12-26 2021-06-24 vaccination campaign and Emergency Response Quotations Envelope on materials - 2 Lots REDISSE-GDS-RFQ-44-2020 / Procurement of Dog Pending Component 3: Preparedness Request for Single Stage - One collar/medals/card and flyers IDA / 59700 Post Limited 614,037.00 0.00 Implementati 2020-10-31 2020-12-26 2021-06-24 and Emergency Response Quotations Envelope for anti-rabies vaccination on campaign materials - 2 Lots REDISSE-GDS-RFQ-56-2020 / Procurement of 6 Nos. Laptops, 69 Nos. Small Screen Component 5: Institutional Mobile Devices & Accessories, Pending Capacity Building, Project Request for Single Stage - One MDM & Kiosk App including IDA / 59700 Post Limited 192,320.00 0.00 Implementati 2020-12-26 2021-02-20 2021-08-19 Management, Coordination Quotations Envelope insurance for SORMAS and on and Advocacy Office Logistics/Maintenance for 12 Months for HHS - 2 Lots REDISSE-GDS-RFQ-01-2021 Pending / Procurement of Laptops and Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 12,106.00 0.00 Implementati 2021-01-27 2021-03-24 2021-09-20 Modems to support FCT Data and Information Systems Quotations Envelope on Clerks REDISSE-GDS-RFB-01-2021 / Procurement of Lassa Fever Stockpiles including Ribavirin Under Injections, Ribavirin Tablets, Component 2: Strengthening Single Stage - One IDA / 59700 Post Request for Bids Open - National 1,102,618.00 0.00 Implementati 2021-01-22 2021-01-27 2021-01-27 2021-05-10 2021-03-10 2021-04-09 2021-05-14 2021-11-10 Personal Protective of Laboratory Capacity Envelope on Wears(PPEs) and Critical Consumables for Outbreak Response - 4 Lots REDISSE-GDS-DIR-01-2021 / Procurement of Reagents for Component 2: Strengthening IDA / 59700 Post Direct Selection Direct 569,680.00 521,249.45 Signed 2021-02-10 2021-02-09 2021-02-15 2021-02-24 2021-03-22 2021-03-11 2021-09-18 Molecular Diagnosis of Lassa of Laboratory Capacity fever and Yellow fever. REDISSE-GDS-RFQ-03-2021- Pending HH / Printing of 3000 copies Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 19,737.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 of technical guidelines for all and Information Systems Quotations Envelope on States & other stakeholders. REDISSE-GDS-RFQ-04-2021- Pending HH / Printing of 35,000 Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 138,158.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 copies of SOPs for all health and Information Systems Quotations Envelope on facilities in Nigeria REDISSE-GDS-RFQ-02-2021- HH / Printing of IDSR Pending Component 1: Surveillance Request for Single Stage - One reporting forms, Rumor Log, IDA / 59700 Post Limited 337,145.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 and Information Systems Quotations Envelope Case investigation form and on Contract tracing forms. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual REDISSE-NC-RFQ-01 / Pending Distribution of Office logistics Component 1: Surveillance Request for Single Stage - One IDA / 59700 Post Limited 16,393.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 and Lab. Materials to 37 and Information Systems Quotations Envelope on states, NVRI and 10 VTHs Page 7 REDISSE-NC-RFB-02 / Procurement of courier service Component 2: Strengthening Single Stage - One logistics for specimen IDA / 59700 Post Request for Bids Open - National 32,754.00 0.00 Canceled 2018-11-30 2018-12-05 2019-01-16 2019-02-15 2019-03-22 2019-09-18 of Laboratory Capacity Envelope transportation and pre- positioning of supplies Component 5: Institutional REDISSE-NC-RFQ-03 / Pending Capacity Building, Project Request for Single Stage - One Support for utility fees for IDA / 59700 Post Limited 9,836.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 Management, Coordination Quotations Envelope electricity for 12 months - AH on and Advocacy Component 5: Institutional REDISSE-NC-RFQ-04 / Pending Capacity Building, Project Request for Single Stage - One Provision for vehicle IDA / 59700 Post Limited 14,164.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 Management, Coordination Quotations Envelope maintenence- AH on and Advocacy Component 5: Institutional REDISSE-NC-RFQ-05 / Pending Capacity Building, Project Request for Single Stage - One Provision for maintenance IDA / 59700 Post Limited 3,934.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 Management, Coordination Quotations Envelope services -AH on and Advocacy Component 5: Institutional REDISSE-NC-RFQ-06 / Pending Capacity Building, Project Request for Single Stage - One Provision for utility fees IDA / 59700 Post Limited 1,967.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 Management, Coordination Quotations Envelope (water) for 12 months - AH on and Advocacy Component 5: Institutional REDISSE-NC-RFQ-07 / Pending Capacity Building, Project Request for Single Stage - One Provision for waste IDA / 59700 Post Limited 1,639.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 Management, Coordination Quotations Envelope management disposal -AH on and Advocacy REDISSE-NCS-RFQ -01-2020 / Maintenance for Quant Pending Component 2: Strengthening Request for Studio 12 flex; Quant Studio 5 IDA / 59700 Post 41,667.00 0.00 Implementati 2020-03-23 2020-03-23 2020-03-23 of Laboratory Capacity Quotations flex; and, Maintenance for on MagPix REDISSE-NCS-RFQ -02-2020 Pending Component 2: Strengthening Request for / Maintenance for Master IDA / 59700 Post 13,889.00 0.00 Implementati 2020-03-23 2020-03-23 2020-03-23 of Laboratory Capacity Quotations cycler X50 on REDISSE-NCS-RFQ-03-2020 / Procurement of Insurance Pending Component 3: Preparedness Request for Single Stage - One Policies for 40 nos project IDA / 59700 Post Limited 79,051.00 0.00 Implementati 2020-10-17 2020-12-12 2021-06-10 and Emergency Response Quotations Envelope Vehicles for EOC's rapid on response REDISSE-NCS-DIR-02-2020 / Provide monthly airtime for Component 4: Human the CVO's office, project staff Pending Resource Management for , Federal and State Epid. IDA / 59700 Post Direct Selection Direct 9,859.00 0.00 Implementati 2020-11-02 2020-11-07 2020-12-12 2021-06-10 Effective Disease Surveillance Officers for disease on and Epidemic Preparedness reporting , phone calls and bulk SMS on feedback REDISSE-NCS-RFQ-06-2020 / Procurement of Pending Transportation Services of Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 34,862.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 materials for disease and Emergency Response Quotations Envelope on containment and surveillance to states, VTHs, NVRI, LBMs REDISSE-NCS-RFQ-07-2020 Pending / Support for anti rabies Component 3: Preparedness Request for Single Stage - One IDA / 59700 Post Limited 273,606.00 0.00 Implementati 2020-11-28 2021-01-23 2021-07-22 vaccination campaign logistics and Emergency Response Quotations Envelope on in high risk states REDISSE-NCS-RFQ-05-2020 Component 5: Institutional Pending / Insurance of vehicles, Capacity Building, Project Request for Single Stage - One IDA / 59700 Post Limited 326,544.00 0.00 Implementati 2020-11-07 2021-01-02 2021-07-01 motorcycles and tricycles for Management, Coordination Quotations Envelope on AHS and Advocacy Component 5: Institutional REDISSE-NCS-RFQ-08-2020 Pending Capacity Building, Project Request for Single Stage - One / Comprehensive insurance of IDA / 59700 Post Limited 70,587.00 0.00 Implementati 2021-01-03 2021-02-28 2021-08-27 Management, Coordination Quotations Envelope vehicles/Renewal on and Advocacy CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual REDISSE-CS-CQS-01 / Consultancy for Branding and Component 5: Institutional Consultant corporate communication Capacity Building, Project IDA / 59700 Post Qualification Open - National 42,081.00 0.00 Canceled 2018-08-15 2018-09-05 2018-10-19 2018-11-18 2018-12-23 2019-06-21 including development of risk Management, Coordination Selection communication strategies for and Advocacy the REDISSE project REDISSE-CS-CQS-03 / Consultancy for Establising, Component 5: Institutional developing, training, and Consultant Capacity Building, Project Pending licensing enterprise IDA / 59700 Post Qualification Open - National 162,295.00 0.00 2018-10-30 2018-11-20 2019-01-03 2019-02-02 2019-03-09 2019-09-05 Management, Coordination Implementation management of software for Selection and Advocacy Procurement, Audit and Financial management. REDISSE-CS-INDV -06 / Needs assessment and consensus building for human Consultant and animal health information Component 1: Surveillance IDA / 59700 Post Qualification Open - National 69,512.00 0.00 Canceled 2018-10-30 2018-11-20 2019-01-03 2019-02-02 2019-03-09 2019-09-05 systems to develop a plan and and Information Systems Selection road map for an interconnected real-time system. REDISSE-CS-CQS-04 / Consultant Consultancy for a National Component 2: Strengthening IDA / 59700 Post Qualification Open - National 105,478.00 0.00 Canceled 2018-10-30 2018-11-20 2019-01-03 2019-02-02 2019-03-09 2019-09-05 Public Health Laboratory of Laboratory Capacity Selection Needs Assessment Page 8 REDISSE-CS-CQS-06 / Consultancy for re- assessment of 37 Veterinary Consultant Component 1: Surveillance Public Health/ Epidemiology IDA / 59700 Post Qualification Open - National 58,230.00 0.00 Canceled 2018-10-22 2018-11-12 2018-12-26 2019-01-25 2019-03-01 2019-08-28 and Information Systems offices, preparation of BOQs Selection and Supervision of Rehabilitation REDISSE-CS-CQS-07 / Consultancy for assessment of Isolation Units in State Consultant Capitals in the country to Component 3: Preparedness IDA / 59700 Post Qualification Open - National 61,341.00 0.00 Canceled 2018-10-22 2018-11-12 2018-12-26 2019-01-25 2019-03-01 2019-08-28 identify gaps compared to and Emergency Response Selection global best practice and develop minimum standards for isolation practice. Component 5: Institutional REDISSE-CS-CQS-01-2020 / Consultant Capacity Building, Project Pending Engagement of External IDA / 59700 Post Qualification Limited 13,889.00 0.00 2020-04-27 2020-05-11 2020-06-10 2020-07-15 2021-01-11 Management, Coordination Implementation Auditor for REDISSE II Project. Selection and Advocacy REDISSE-CS-CQS-02-2020 / Consultant Consultancy for Supervision of Component 3: Preparedness Under IDA / 59700 Post Qualification Limited 198,144.00 0.00 2020-06-29 2020-09-17 2020-07-13 2020-08-12 2020-09-16 2021-03-15 Construction of 5Nos. and Emergency Response Implementation Selection Isolation/Treatment Centre REDISSE-CS-CQS-03-2020 / Engage Consultants to Consultant Component 1: Surveillance Under Upgrade the National Animal IDA / 59700 Post Qualification Limited 26,586.00 0.00 2020-11-18 2020-11-09 2020-12-02 2021-01-01 2021-02-05 2021-08-04 and Information Systems Implementation Disease Information System Selection (NADIS) database INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual REDISSE-CS-INDV -01 / Engagement of Individual Component 4: Human Individual Consultants from relevant Resource Management for IDA / 59700 Post Consultant Direct 7,026.00 0.00 Canceled 2018-11-15 2018-11-25 2018-12-16 2019-01-20 2019-07-19 Sectors to develop a National Effective Disease Surveillance Selection Strategy for ONE Health and and Epidemic Preparedness Workforce startegy REDDISSE-CS-INDV -02 / Recruitment of 3 Consultants Component 4: Human Individual to support for 12 months to Resource Management for IDA / 59700 Post Consultant Open 89,705.00 0.00 Canceled 2018-10-20 2018-12-08 2018-12-29 2019-02-02 2019-08-01 facilitate NCDC-FETP training Effective Disease Surveillance Selection and lead redesign of the FETP and Epidemic Preparedness programme REDISSE-CS-INDV -04 / Component 5: Institutional Engagement of a Consultant Individual Capacity Building, Project to provide Safeguard,Waste IDA / 59700 Post Consultant Limited 13,633.00 0.00 Canceled 2018-10-30 2018-11-04 2018-11-25 2018-12-30 2019-06-28 Management, Coordination Management and Grievance Selection and Advocacy Support REDISSE-CS-INDV -08 / Individual Consultancy for Situational Component 3: Preparedness IDA / 59700 Post Consultant Open 15,422.00 0.00 Canceled 2018-10-30 2018-12-18 2019-01-08 2019-02-12 2019-08-11 Analysis and Development of and Emergency Response Selection a Multi-hazard Plans REDISSE-CS-INDV -09 / Consultancy for to conduct gap analysis of the existing Individual Component 1: Surveillance Under surveillance system for IDA / 59700 Post Consultant Open 14,491.00 0.00 2018-10-30 2018-12-18 2019-01-08 2019-02-12 2019-08-11 and Information Systems Implementation Transboundary Animal Selection Diseases and zoonotic diseases REDISSE-CS-INDV -10 / Consultancy to conduct the Individual prioritazation of TADs and Component 1: Surveillance Pending IDA / 59700 Post Consultant Open 7,383.00 0.00 2018-10-30 2018-12-18 2019-01-08 2019-02-12 2019-08-11 zoonotic diseases. Review and Information Systems Implementation Selection and update priority animal diseases TADs and REDISSE-CS-INDV -11 / Consultancy to harmonize and Individual develop guidelines, protocols Component 1: Surveillance IDA / 59700 Post Consultant Open 5,350.00 0.00 Canceled 2018-11-15 2019-01-03 2019-01-24 2019-02-28 2019-08-27 and tools for animal disease and Information Systems Selection surveillance and disease reporting processes REDISSE-CS-INDV-X / Map the hot-spots in human, wild Individual Component 1: Surveillance Under and domestic animal species IDA / 59700 Post Consultant Limited 24,105.00 0.00 2019-01-16 2019-01-21 2019-02-11 2019-03-18 2019-09-14 and Information Systems Implementation interfaces for zoonotic Selection diseases and TAD REDISSE-CS-INDV-XXX / Component 4: Human Support ad hoc animal health Individual Resource Management for Pending officers in state with IDA / 59700 Post Consultant Limited 196,722.00 0.00 2018-11-28 2018-12-03 2018-12-24 2019-01-28 2019-07-27 Effective Disease Surveillance Implementation inadequate human resources Selection and Epidemic Preparedness - Hire 20 ad hoc Veterinarians . REDISSE-CS-INDV-XXXX / Consultancy to scale up and Individual Component 1: Surveillance training of animal diseases IDA / 59700 Post Consultant Limited 14,943.00 0.00 Canceled 2019-01-15 2019-01-20 2019-02-10 2019-03-17 2019-09-13 and Information Systems surveillance agents from 591 Selection -1000 Component 4: Human REDISEE-CS-INDV-XXXXX / Individual Resource Management for Under Hiring of 10 adhoc Laboratory IDA / 59700 Post Consultant Limited 61,968.00 0.00 2018-11-28 2019-04-19 2018-12-03 2018-12-24 2019-01-28 2019-07-27 Effective Disease Surveillance Implementation staff at NRL Selection and Epidemic Preparedness Page 9 REDISSE-CS-INDV-XXXXXX / Consultancy to complete the Individual Component 3: Preparedness Pending development of the Medical IDA / 59700 Post Consultant Limited 11,031.00 0.00 2018-11-28 2018-12-03 2018-12-24 2019-01-28 2019-07-27 and Emergency Response Implementation Counter-measures Logistics Selection Plan Component 5: Institutional REDISSE-CS-INDV-XXXXXXX / Individual Capacity Building, Project Engagement of 1No. IDA / 59700 Post Consultant Limited 45,246.00 46,188.64 Completed 2018-11-15 2018-12-10 2018-11-20 2018-04-17 2018-12-11 2018-04-25 2019-01-15 2018-04-30 2019-07-14 2019-04-30 Management, Coordination Procurement Consultant Selection and Advocacy REDISSE-CS-INDV -03 / Engagement of 5 Component 5: Institutional Individual Consultants/Specialists in Capacity Building, Project IDA / 59700 Post Consultant Open 253,377.00 0.00 Canceled 2018-10-20 2018-12-08 2018-12-29 2019-02-02 2019-08-01 relevant Thematic Areas to Management, Coordination Selection support Project and Advocacy Implementation REDISSE-CS-INDV -07 / Consultancy to develop Individual strategy and training modules Component 2: Strengthening IDA / 59700 Post Consultant Direct 6,628.00 0.00 Canceled 2018-10-30 2018-11-09 2018-11-30 2019-01-04 2019-07-03 on shipment of samples for of Laboratory Capacity Selection diagnosis of zoonotic and epidemic prone diseases NG-NCDC-102557-CS-INDV / Terms of Reference for the Deployment of Surge Staff for Individual Component 3: Preparedness Pending Lassa Fever Case Management IDA / 59700 Post Consultant Limited 28,032.79 0.00 2019-02-25 2019-03-02 2019-03-23 2019-04-27 2019-10-24 and Emergency Response Implementation to the Infection Control Selection Centre, Federal Medical Centre, Owo, Ondo State. NG-NCDC-102596-CS-INDV / Terms of Reference for the deployment of surge staff for Individual Component 3: Preparedness Pending Lassa Fever Case Management IDA / 59700 Post Consultant Limited 28,032.79 0.00 2019-03-04 2019-03-09 2019-03-30 2019-05-04 2019-10-31 and Emergency Response Implementation to the Lassa Fever Research Selection Institute, Irrua Specialist Teaching Hospital, Edo State. REDISSE-CS-CQS-02 / Component 5: Institutional Consultancy to develop Individual Capacity Building, Project Pending project website and IDA / 59700 Post Consultant Limited 4,348.00 0.00 2019-03-29 2019-04-03 2019-04-24 2019-05-29 2019-11-25 Management, Coordination Implementation development of REDISSE Selection and Advocacy webpages NG-NCDC-98251-CS-INDV / Component 5: Institutional Individual Hire 3 consultants to support Capacity Building, Project Pending IDA / 59700 Post Consultant Limited 38,360.65 0.00 2019-02-07 2019-02-12 2019-03-05 2019-04-09 2019-10-06 IPC data management and risk Management, Coordination Implementation Selection communication. and Advocacy NG-NCDC-108831-CS-INDV Component 5: Institutional / Hiring of Social Safeguard Individual Capacity Building, Project Consultant for initial 90 days IDA / 59700 Post Consultant Limited 24,799.00 14,173.80 Completed 2019-04-04 2019-04-11 2019-04-09 2019-10-17 2019-04-30 2019-11-14 2019-06-04 2020-02-03 2019-12-01 2020-09-25 Management, Coordination and renewable for maximum Selection and Advocacy of 120 days. NG-NCDC-108837-CS-INDV Component 5: Institutional / Hiring of Environmental Individual Capacity Building, Project Safeguards Consultant for IDA / 59700 Post Consultant Limited 24,799.00 8,864.46 Completed 2019-04-04 2019-04-11 2019-04-09 2019-10-17 2019-04-30 2019-11-18 2019-06-04 2020-01-21 2019-12-01 2020-11-20 Management, Coordination initial 90 days and renewable Selection and Advocacy for maximum of 120 days. Component 5: Institutional NG-NCDC-111680-CS-INDV Individual Capacity Building, Project Pending / Hiring of Junior and Mid- IDA / 59700 Post Consultant Limited 51,541.00 0.00 2019-05-15 2019-05-20 2019-06-10 2019-07-15 2020-01-11 Management, Coordination Implementation level Adhoc Support staff Selection and Advocacy NG-NCDC-111694-CS-INDV Component 5: Institutional Individual / Hiring of an Administrative Capacity Building, Project IDA / 59700 Post Consultant Limited 13,800.00 1,354.76 Signed 2019-04-24 2020-03-01 2019-04-29 2020-03-17 2019-05-20 2020-03-20 2019-06-24 2020-04-01 2019-12-21 officer to support the Project Management, Coordination Selection Coordinator and Advocacy NG-NCDC-121477-CS-CDS / Engagement of a Consultant Component 2: Strengthening Under for Biomedical Engineering IDA / 59700 Post Direct Selection Direct 9,285.25 0.00 2019-06-28 2019-03-24 2019-07-08 2019-09-11 2020-03-09 of Laboratory Capacity Implementation Support to ensure equipment functionality NG-NCDC-127508-CS-INDV Component 5: Institutional / Extension/Renewal of the Individual Capacity Building, Project Procurement Consultant's IDA / 59700 Post Consultant Direct 60,309.00 47,591.16 Completed 2019-08-16 2019-04-25 2019-08-26 2019-04-25 2019-09-16 2019-04-27 2019-10-21 2019-04-30 2020-04-18 2020-07-02 Management, Coordination Contract for 264 days in 12 Selection and Advocacy Calendar months NG-NCDC-147259-CS-INDV / Engagement of SORMAS Individual Component 1: Surveillance Pending Implementation Support IDA / 59700 Post Consultant Limited 23,606.56 0.00 2019-12-02 2019-12-07 2019-12-28 2020-02-01 2020-07-30 and Information Systems Implementation Officer one each in Taraba Selection State and Delta State. REDISSE-CS-INDV -01-2020 Component 4: Human Individual / Hiring of Data Management , Resource Management for Under IDA / 59700 Post Consultant 7,353.00 0.00 2020-03-23 2020-03-02 2020-03-23 2020-03-23 2020-03-23 2020-03-23 Entry and Processing Officer Effective Disease Surveillance Implementation Selection (Procurement) and Epidemic Preparedness REDISSE-CS-INDV -02-2020 / Hiring of 28 personnel connect centre response team Component 4: Human Individual (4 Supervisors, 20 call agents, Resource Management for Under IDA / 59700 Post Consultant 80,556.00 0.00 2020-03-23 2020-04-03 2020-03-23 2020-03-23 2020-03-23 2020-03-23 2 IT support and 2 Laboratory Effective Disease Surveillance Implementation Selection Data and Epidemic Preparedness Management/Communication officer) REDISSE-CS-INDV -03-2020 / Engagement of Consultant Component 4: Human for Architectural designs and Individual Resource Management for Under BOQ's for Construction of 5 IDA / 59700 Post Consultant 41,667.00 0.00 2020-04-08 2020-04-07 2020-04-08 2020-04-08 2020-04-08 2020-04-08 Effective Disease Surveillance Implementation nos. New Treatment Centre Selection and Epidemic Preparedness with 40 beds patient carrying capacity Page 10 REDISSE-CS-INDV-05-2020 / Engagement of 50 additional ad-hoc Veterinarians/animal Component 4: Human Individual health worker for state with Resource Management for Under IDA / 59700 Post Consultant Open 583,334.00 0.00 2020-08-03 2020-11-30 2020-09-21 2020-10-12 2020-11-16 2021-05-15 inadequate Veterinary human Effective Disease Surveillance Implementation Selection resources for the Animal and Epidemic Preparedness Health Sector of the REDISSE Project. Component 5: Institutional REDISSE-CS-INDV-06-2020 / Individual Capacity Building, Project Pending Engagement of 2 ad-hoc IDA / 59700 Post Consultant Open 13,334.00 0.00 2020-08-10 2020-09-28 2020-10-19 2020-11-23 2021-05-22 Management, Coordination Implementation Procurement Officers for AHS Selection and Advocacy REDISSE-CS-INDV-10-2020 / Component 5: Institutional Procurement Consultant: Individual Capacity Building, Project Extension of consultancy to IDA / 59700 Post Consultant Direct 49,361.00 0.00 Under Review 2020-08-24 2020-05-06 2020-09-03 2020-09-24 2020-10-29 2021-04-27 Management, Coordination support activities of REDISSE Selection and Advocacy for 1 year REDISSE-CS-INDV-11-2020 / Individual Engagement of Two Component 3: Preparedness Under IDA / 59700 Prior Consultant Open 53,685.00 0.00 2020-10-05 2020-11-30 2020-11-23 2020-12-14 2021-01-18 2021-07-17 Procurement Consultants for and Emergency Response Implementation Selection 1 Year REDISSE-CS-INDV-14-2020 / Engage a consultant to carry Individual Component 2: Strengthening Under out need assessment of NVRI IDA / 59700 Post Consultant Open 27,528.00 0.00 2020-10-19 2020-09-28 2020-12-07 2020-12-28 2021-02-01 2021-07-31 of Laboratory Capacity Implementation outstations and VTH Selection Laboratories REDISSE-CS-INDV-16-2020 / Engage a consultant to Individual develop a National Integrated Component 3: Preparedness IDA / 59700 Post Consultant Limited 14,104.00 0.00 Canceled 2020-10-26 2020-03-25 2020-10-31 2020-11-21 2020-12-26 2021-06-24 Preparedness Plans (EPP) for and Emergency Response Selection TADs and emerging and remerging animal diseases Component 5: Institutional REDISSE-CS-INDV-04-2020 / Individual Capacity Building, Project Engagement of 2 ad-hoc IDA / 59700 Post Consultant Open 5,334.00 0.00 Canceled 2020-08-10 2020-09-28 2020-10-19 2020-11-23 2021-05-22 Management, Coordination Drivers for AHS Selection and Advocacy Component 5: Institutional REDISSE-CS-INDV-08-2020 / Individual Capacity Building, Project Engagement of an ad-hoc IDA / 59700 Post Consultant Open 6,667.00 0.00 Canceled 2020-08-10 2020-09-28 2020-10-19 2020-11-23 2021-05-22 Management, Coordination M&E Officer for AHS Selection and Advocacy Component 5: Institutional REDISSE-CS-INDV-07-2020 / Individual Capacity Building, Project Engagement of 2 ad-hoc IDA / 59700 Prior Consultant Open 13,334.00 0.00 Canceled 2020-08-10 2020-09-28 2020-10-19 2020-11-23 2021-05-22 Management, Coordination Store Officers for AHS Selection and Advocacy REDISSE-CS-INDV-13-2020 / Component 5: Institutional Individual Engagement of 1 Team Capacity Building, Project IDA / 59700 Post Consultant Limited 7,895.00 7,285.98 Signed 2020-11-09 2020-11-20 2020-11-14 2021-01-13 2020-12-05 2021-02-19 2021-01-09 2021-02-24 2021-07-08 Assistant to Support the Management, Coordination Selection Project Coordinator and Advocacy Component 5: Institutional REDISSE-CS-INDV-20-2020 / Individual Capacity Building, Project Under Engagement of an ad-hoc IDA / 59700 Post Consultant Limited 7,895.00 0.00 2020-11-09 2020-02-04 2020-11-14 2020-12-05 2021-01-09 2021-07-08 Management, Coordination Implementation M&E Officer for AHS Selection and Advocacy Component 5: Institutional REDISSE-CS-INDV-21-2020 / Individual Capacity Building, Project Engagement of 2 ad-hoc IDA / 59700 Post Consultant Limited 5,334.00 0.00 Under Review 2020-11-11 2020-02-04 2020-11-16 2020-12-07 2021-01-11 2021-07-10 Management, Coordination Drivers for AHS Selection and Advocacy REDISSE-CS-INDV-12-2020 / Engagement of 2 Monitoring Individual and Evaluation Assistants to Component 3: Preparedness IDA / 59700 Post Consultant Open 15,790.00 0.00 Canceled 2020-10-12 2020-11-30 2020-12-21 2021-01-25 2021-07-24 support REDISSE II and and Emergency Response Selection COPREP implementation Process at the PCU REDISSE-CS-INDV-22-2020 / Engagement of 2 Monitoring Component 5: Institutional Individual and Evaluation Assistants to Capacity Building, Project IDA / 59700 Post Consultant Limited 15,790.00 14,571.96 Signed 2020-11-12 2020-11-25 2020-11-17 2020-12-23 2020-12-08 2021-02-23 2021-01-12 2021-03-01 2021-07-11 support REDISSE II and Management, Coordination Selection COPREP implementation and Advocacy Process at the PCU Component 5: Institutional REDISSE-CS-INDV-18-2020 / Individual Capacity Building, Project Under Engagement of 2 ad-hoc IDA / 59700 Post Consultant Limited 13,334.00 0.00 2020-11-09 2020-02-04 2020-11-14 2020-12-05 2021-01-09 2021-07-08 Management, Coordination Implementation Store Officers for AHS Selection and Advocacy Component 5: Institutional REDISSE-CS-INDV-19-2020 / Individual Capacity Building, Project Under Engagement of 2 ad-hoc IDA / 59700 Post Consultant Limited 13,334.00 0.00 2020-11-09 2020-02-04 2020-11-14 2020-12-05 2021-01-09 2021-07-08 Management, Coordination Implementation Procurement Officers for AHS Selection and Advocacy REDISSE-CS-INDV-17-2020 / Engagement of Logistics Component 4: Human Individual Management Information Resource Management for IDA / 59700 Post Consultant Limited 7,895.00 7,285.98 Signed 2020-11-18 2020-10-13 2020-11-23 2021-01-13 2020-12-14 2021-02-12 2021-01-18 2021-02-24 2021-07-17 System Officer for the NCDC Effective Disease Surveillance Selection Supply Chain for a period of and Epidemic Preparedness 12 months REDISSE-CS-CDS-01-2020 / Engage a Vulnerability Risk Component 3: Preparedness Under IDA / 59700 Post Direct Selection Direct 4,556.00 0.00 2020-11-18 2020-11-27 2020-11-28 2021-01-13 2021-02-01 2021-07-31 Assessment Mapping (VRAM) and Emergency Response Implementation Data Analyst REDISSE-CS-INDV-09-2020 / Engagement of 4 nos. Component 4: Human Individual Technical Resource Management for Under IDA / 59700 Post Consultant Limited 94,667.00 0.00 2020-11-25 2020-02-18 2020-11-30 2020-12-21 2021-01-25 2021-07-24 Assistants/Consultants for Effective Disease Surveillance Implementation Selection operational management of and Epidemic Preparedness NFELTP Page 11 REDISSE-CS-CDS-03-2020 / Support to 2 Research teams for Nigeria COVID-19 Component 2: Strengthening Under IDA / 59700 Post Direct Selection Direct 52,632.00 0.00 2020-11-25 2021-01-07 2020-12-05 2021-02-08 2021-08-07 Consortium of Rapid of Laboratory Capacity Implementation Diagnostic Test (RDTs) Kits for COVID-19 in Nigeria. REDISSE-CS-INDV-26-2020 / Component 4: Human Engagement of a National Individual Resource Management for Under Consultant to Develop IDA / 59700 Post Consultant Limited 15,210.00 0.00 2020-12-07 2020-12-01 2020-12-12 2021-01-02 2021-02-06 2021-08-05 Effective Disease Surveillance Implementation National Public Health Selection and Epidemic Preparedness Workforce Strategy REDISSE-CS-CDS-04-2020 / Component 5: Institutional Engagement of advocacy and Capacity Building, Project IDA / 59700 Post Direct Selection Direct 22,516.00 21,857.94 Signed 2020-12-07 2020-12-01 2020-12-17 2021-01-18 2021-02-20 2021-03-01 2021-08-19 communications consultant Management, Coordination for 12 Months and Advocacy REDISSE-CS-INDV-23-2020 / Engagement of a consultant Individual to develop National Integrated Component 3: Preparedness Under IDA / 59700 Post Consultant Limited 14,104.00 0.00 2020-12-07 2020-03-25 2020-12-12 2021-01-02 2021-02-06 2021-08-05 Preparedness Plans (EPP) for and Emergency Response Implementation Selection TADs and emerging and remerging animal diseases REDISSE-CS-INDV-25-2020 / Component 4: Human Engagement of a consultant Individual Resource Management for Under for 2 months to develop IDA / 59700 Post Consultant Limited 14,484.00 0.00 2020-12-07 2020-11-14 2020-12-12 2021-01-02 2021-02-06 2021-08-05 Effective Disease Surveillance Implementation database of all veterinarians Selection and Epidemic Preparedness and para-veterinarians REDISSE-CS-INDV-24-2020 / Engagement of a consultant to conduct gap analysis for Individual Component 1: Surveillance Pending the existing animal diseases IDA / 59700 Post Consultant Limited 14,953.00 0.00 2020-12-07 2020-12-12 2021-01-02 2021-02-06 2021-08-05 and Information Systems Implementation surveillance system for Selection zoonotic and non-zoonotic diseases REDISSE-CS-INDV-15-2020 / conduct 2 problem oriented Individual research and studies on Component 2: Strengthening Pending IDA / 59700 Post Consultant Open 132,369.00 0.00 2020-10-26 2020-12-14 2021-01-04 2021-02-08 2021-08-07 TADS , major zoonotic of Laboratory Capacity Implementation Selection disease outbreaks towards scientific publications. REDISSE-CS-CDS-01-2021 / Data Management, Entry and Component 5: Institutional Processing Officer Capacity Building, Project Under IDA / 59700 Post Direct Selection Direct 7,895.00 0.00 2021-01-25 2021-01-22 2021-02-04 2021-04-10 2021-10-07 (Procurement): Extension of Management, Coordination Implementation consultancy to support and Advocacy activities of REDISSE for 1 year Component 5: Institutional REDISSE-CDS-19-02 / Capacity Building, Project Procurement of Flexible IDA / 59700 Post Direct Selection Direct 26,316.00 29,837.59 Signed 2021-01-25 2019-12-05 2021-02-04 2020-02-05 2021-04-10 2021-02-01 2021-10-07 Management, Coordination Accounting Software and Advocacy REDISSE-CS-CDS-02-2021 / Engagement of a consultant for the Preparation of an Environmental and Social Management Plan (ESMP) for Component 3: Preparedness IDA / 59700 Post Direct Selection Direct 13,050.00 12,131.48 Signed 2021-02-10 2021-02-10 2021-02-20 2021-01-27 2021-04-26 2021-02-16 2021-10-23 the Construction of Infectious and Emergency Response Disease (COVID-19) Treatment Centre at the Aminu Kano Teaching Hospital, Kano REDISSE-CS-CDS-03-2021 / Engagement of a consultant for the Preparation of Environmental and Social Management Plans (ESMPs) for Component 3: Preparedness Under IDA / 59700 Post Direct Selection Direct 12,787.00 0.00 2021-02-11 2021-02-10 2021-02-21 2021-01-27 2021-04-27 2021-10-24 the Construction of Infectious and Emergency Response Implementation Disease (COVID-19) Treatment Centre at the University of Port Harcourt Teaching Hospital, (UPTH) REDISSE-CS-CDS-04-2021 / Engagement of a consultant for the Preparation of Environmental and Social Management Plans (ESMPs) for Component 3: Preparedness Under IDA / 59700 Post Direct Selection Direct 12,787.00 0.00 2021-02-12 2021-02-10 2021-02-22 2021-04-28 2021-10-25 the Construction of Infectious and Emergency Response Implementation Disease (COVID-19) Treatment Centre at the Lagos University Teaching Hospital, (LUTH) REDISSE-CS-CDS-05-2021 / Engagement of a consultant for the Preparation of an Environmental and Social Management Plan (ESMP) for Component 3: Preparedness IDA / 59700 Post Direct Selection Direct 12,787.00 11,886.83 Signed 2021-02-13 2021-02-10 2021-02-23 2021-01-27 2021-04-29 2021-02-12 2021-10-26 the Construction of Infectious and Emergency Response Disease (COVID-19) Treatment Centre at the University of Nigeria Teaching Hospital (UNTH), Enugu REDISSE-CS-CDS-06-2021 / Engagement of a consultant for the Preparation of an Environmental and Social Management Plan (ESMP) for Component 3: Preparedness Under IDA / 59700 Post Direct Selection Direct 12,787.00 0.00 2021-02-14 2021-02-10 2021-02-24 2021-04-30 2021-10-27 the Construction of Infectious and Emergency Response Implementation Disease (COVID-19) Treatment Centre at the University of Ilorin Teaching Hospital, Kwara State REDISSE-CS-INDV-01-2021- Individual HH / SORMAS Surveillance Component 1: Surveillance IDA / 59700 Post Consultant Direct 360,000.00 324,187.42 Signed 2021-04-27 2021-04-23 2021-05-07 2021-04-26 2021-05-28 2021-04-30 2021-07-02 2021-04-30 2021-12-29 Support Officer's Re- and Information Systems Selection Engagement Page 12 REDISSE-CS-INDV-02-2021- Individual Component 1: Surveillance HH / SORMAS Data Officers IDA / 59700 Post Consultant Direct 150,000.00 123,570.16 Signed 2021-04-27 2021-04-23 2021-05-07 2021-04-26 2021-05-28 2021-04-30 2021-07-02 2021-04-30 2021-12-29 and Information Systems and Clerks Re-Engagement Selection REDISSE-CS-INDV-03-2021- HH / SORMAS IT Experts, Individual Component 1: Surveillance Operations manager and IDA / 59700 Post Consultant Direct 100,000.00 68,971.93 Signed 2021-04-27 2021-04-23 2021-05-07 2021-04-26 2021-05-28 2021-04-30 2021-07-02 2021-04-30 2021-12-29 and Information Systems Admin Support Re- Selection Engagement REDISSE-CS-INDV-04-2021- HH / ENGAGEMENT OF 8NOS. Individual LABORATORY STAFF TO Component 2: Strengthening IDA / 59700 Post Consultant Limited 65,158.00 0.00 Under Review 2021-05-17 2021-05-04 2021-05-22 2021-06-12 2021-07-17 2022-01-13 SUPPORT DISEASE DIAGNOSIS of Laboratory Capacity Selection AT THE NATIONAL REFERENCE LABORATORY (NRL), GADUWA. REDISSE-CS-INDV-05-2021- HH / Engagement of a Consultant to conduct Individual assessment of the current Component 1: Surveillance Under IDA / 59700 Post Consultant Limited 7,487.00 0.00 2021-05-24 2021-06-07 2021-05-29 2021-06-19 2021-07-24 2022-01-20 situation of community-based and Information Systems Implementation Selection surveillance in Nigeria & develop National CBS Strategic Plan. Page 13 PROCUREMENT PLAN (Textual Part) Project information: Angola, Electricity Sector Improvement Project (P166805) Project Implementation agency: Ministry of Energy and Water - GEPE Date of the Procurement Plan: 24 July 2019 Period covered by this Procurement Plan: July 2019 to 30 June 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used, once and if approved by the World Bank. When the Borrower uses its own national open competitive procurement arrangements as set forth in Law No. 9/16 dated 16 June (Lei dos Contratos Públicos), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and additional conditions acceptable to and agreed with the World Bank. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables. PROCUREMENT Angola : Angola - Electricity Sector Improvement and Access Project PLAN General Information Country: Angola Bank’s Approval Date of the Original Procurement Plan: 2019-07-25 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166805 GPN Date: 2021-06-22 Project Name: Angola - Electricity Sector Improvement and Access Project Loan / Credit No: IBRD / P4990 M Executing Agency(ies): inistry of Energy and Water - GEPE WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AO-MINEA - GEPE-210427- Pending CW-RFB / Rehabilitation and Electricity service Single Stage - One 33,250,000.0 2024-01- IBRD / P4990 Prior Request for Bids Open - International 0.00 Implementat 2022-04-03 2022-04-08 2022-05-20 2022-07-04 2022-08-08 upgrade of Quileva and Cuito improvement Envelope 0 30 ion substations AO-MINEA - GEPE-210432- CW-RFB / Construction of National Control Centre (primary and backup), Market Operator and supporting Pending Electricity service Single Stage - One 40,500,000.0 2024-08- offices, installation of SCADA IBRD / P4990 Prior Request for Bids Open - International 0.00 Implementat 2022-04-08 2022-04-13 2022-05-25 2022-07-09 2022-08-13 improvement Envelope 0 12 System and upgrade of local ion substation automation systems and supply and installation of meters at border points AO-MINEA - GEPE-210439- CW-RFB / Construction of Primary and Backup Pending Datacentres (Disaster Electricity service Single Stage - One 2024-08- IBRD / P4990 Post Request for Bids Open - International 2,750,000.00 0.00 Implementat 2022-04-17 2022-04-22 2022-06-03 2022-07-18 2022-08-22 Recovery Backup Data Centre improvement Envelope 21 ion and upgrade of existing Data Centre infrastructure and Systems) AO-MINEA - GEPE-210434- Pending CW-RFB / Expansion and Electricity service Single Stage - One 24,700,000.0 2024-10- IBRD / P4990 Prior Request for Bids Open - International 0.00 Implementat 2022-06-01 2022-06-06 2022-07-18 2022-09-01 2022-10-06 upgrade of the improvement Envelope 0 05 ion telecommunication network GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-MINEA - GEPE-210044- GO-RFB / Supply and Electricity access expansion Pending Installation of meters and Single Stage - One IBRD / P4990 and improvement of revenue Prior Request for Bids Open - International 7,000,000.00 0.00 Implementati 2021-09-20 2021-10-05 2021-11-24 2021-12-24 2022-01-28 2023-04-28 meter control center for the Envelope collection on RRP (Revenue Protection Program) AO-MINEA - GEPE-210374- Improvement of PRODEL’s GO-RFB / Supply and Pending capacity and strengthening Single Stage - One installation of dam safety IBRD / P4990 Post Request for Bids Open - International 2,000,000.00 0.00 Implementati 2022-06-23 2022-06-28 2022-08-09 2022-09-08 2022-10-13 2023-04-11 sustainable management of Envelope monitoring equipment, on generation plants software and training AO-MINEA - GEPE-210380- Improvement of PRODEL’s GO-RFB / Supply and Pending capacity and strengthening Single Stage - One installation of hydro- IBRD / P4990 Post Request for Bids Open - International 1,000,000.00 0.00 Implementati 2022-06-30 2022-07-05 2022-08-16 2022-09-15 2022-10-20 2023-04-18 sustainable management of Envelope meteorological monitoring on generation plants equipment and training Improvement of PRODEL’s AO-MINEA - GEPE-210382- Pending capacity and strengthening Single Stage - One GO-RFB / Supply of special IBRD / P4990 Post Request for Bids Open - International 500,000.00 0.00 Implementati 2022-06-15 2022-06-20 2022-08-01 2022-08-31 2022-10-05 2023-04-03 sustainable management of Envelope tools for maintenance (O&M) on generation plants AO-MINEA - GEPE-210385- Improvement of PRODEL’s GO-RFB / Supply and Pending capacity and strengthening Single Stage - One installation of equipment to IBRD / P4990 Post Request for Bids Open - International 1,000,000.00 0.00 Implementati 2022-06-13 2022-06-18 2022-07-30 2022-08-29 2022-10-03 2023-04-01 sustainable management of Envelope upgrade training facilities in on generation plants Lauca AO-MINEA - GEPE-210440- GO-RFB / Supply and training of Engineering and project management software, Pending Electricity service Single Stage - One software for power system IBRD / P4990 Post Request for Bids Open - International 1,250,000.00 0.00 Implementati 2021-06-01 2021-06-06 2021-07-18 2021-09-01 2021-10-06 2022-07-03 improvement Envelope planning, software for on operational studies, software for managing and controlling hydrothermal generation AO-MINEA - GEPE-210377- GO-RFB / Supply and Improvement of PRODEL’s Pending installation of generation capacity and strengthening Single Stage - One IBRD / P4990 Prior Request for Bids Open - International 7,000,000.00 0.00 Implementati 2021-06-15 2021-06-20 2021-08-01 2021-08-31 2021-10-05 2022-04-03 monitoring centre and data sustainable management of Envelope on platform (data centre and generation plants equipment) AO-MINEA - GEPE-210441- Pending GO-RFB / Supply and Electricity service Single Stage - One IBRD / P4990 Post Request for Bids Open - International 2,000,000.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-18 2021-12-02 2022-01-06 2023-04-01 installation of Primary and improvement Envelope on Backup Datacentres software AO-MINEA - GEPE-210443- GO-RFB / Upgrade of the Pending Electricity service Single Stage - One actual Management Support IBRD / P4990 Post Request for Bids Open - International 1,490,000.00 0.00 Implementati 2021-09-06 2021-09-11 2021-10-23 2021-12-07 2022-01-11 2023-04-06 improvement Envelope Systems to RNT-EP's Business on Processes and training Page 1 AO-MINEA - GEPE-210386- Improvement of PRODEL’s Pending GO-RFB / Supply of O&M capacity and strengthening Single Stage - One IBRD / P4990 Post Request for Bids Open - International 1,500,000.00 0.00 Implementati 2022-06-06 2022-06-11 2022-07-23 2022-08-22 2022-09-26 2023-03-25 software for Lauca and sustainable management of Envelope on Luachimo dams generation plants AO-MINEA - GEPE-210442- GO-RFB / Upgrade, Licensing Pending and Support of the Electricity service Single Stage - One IBRD / P4990 Post Request for Bids Open - International 2,710,000.00 0.00 Implementati 2021-09-08 2021-09-13 2021-10-25 2021-12-09 2022-01-13 2023-04-08 Information and improvement Envelope on communication technology Systems AO-MINEA - GEPE-210444- Pending GO-RFB / Maintenance Electricity service Single Stage - One IBRD / P4990 Post Request for Bids Open - International 250,000.00 0.00 Implementati 2021-06-02 2021-06-07 2021-07-19 2021-09-02 2021-10-07 2022-07-04 Management Tool (Portal RNT improvement Envelope on + Sharepoint AO-MINEA - GEPE-210373- GO-RFB / Purchase of Improvement of PRODEL’s Pending hardware computers, capacity and strengthening Single Stage - One IBRD / P4990 Prior Request for Bids Open - International 5,000,000.00 0.00 Implementati 2022-06-23 2022-06-28 2022-08-09 2022-09-08 2022-10-13 2023-04-11 customization, software sustainable management of Envelope on licensing and training for the generation plants upgrade of the ERP MINIMAL NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-MINEA - GEPE-210094- CS-QCBS / Consulting firm (Owner's Engineer) to support PRODEL in preparation of Improvement of PRODEL’s technical specifications, capacity and strengthening Quality And Cost- Pending bidding documents, bid IBRD / P4990 Prior Open - International 4,000,000.00 0.00 2022-01-09 2022-02-08 2022-04-14 2022-05-14 2022-06-28 2022-08-17 2022-09-21 2023-09-21 sustainable management of Based Selection Implementation evaluation reports and generation plants supervision of implementation of generation monitoring centre, dam safety equipment and O&M software AO-MINEA - GEPE-210364- CS-QCBS / Consulting firm to provide PRODEL with Improvement of PRODEL’s corporate advisory services capacity and strengthening Quality And Cost- Pending IBRD / P4990 Post 2,000,000.00 0.00 2021-09-10 2021-10-10 2021-12-14 2022-01-13 2022-02-27 2022-04-18 2022-05-23 2022-11-19 and supervision of sustainable management of Based Selection Implementation implementation of ERP generation plants (Upgrade of MINIMAL) installation AO-MINEA - GEPE-210372- Improvement of PRODEL’s CS-QCBS / Corporate and capacity and strengthening Quality And Cost- Pending IBRD / P4990 Post Open - International 2,000,000.00 0.00 2021-09-15 2021-10-15 2021-12-29 2022-01-28 2022-03-14 2022-05-03 2022-06-07 2023-06-07 technical training (HR, sustainable management of Based Selection Implementation Finance, Procurement, etc) generation plants AO-MINEA - GEPE-210406- CS-QCBS / Owner's Engineer firm to design, prepare bidding documents to contract the EPC and supervise the Construction of Electricity service Quality And Cost- Pending IBRD / P4990 Post Open - International 2,250,000.00 0.00 2021-05-24 2021-06-23 2021-08-27 2021-09-26 2021-11-10 2021-12-30 2022-02-03 2024-05-03 the National Control Centre improvement Based Selection Implementation (main and backup), Market Operator and supporting offices, installation of SCADA System and Upgrade of local sub AO-MINEA - GEPE-210416- CS-QCBS / Consultant firm prepare the RNT's IT Strategic plan and support the client Electricity service Quality And Cost- Pending during the upgrade and IBRD / P4990 Post Open - International 450,000.00 0.00 2021-06-01 2021-07-01 2021-09-04 2021-10-04 2021-11-18 2022-01-22 2022-02-26 2023-08-20 improvement Based Selection Implementation customization of the Modules of the "MINIMAL" ERP and installation of Primary and Backup Datacentres software AO-MINEA - GEPE-210422- CS-QCBS / Consulting firm to carry out feasibility study for Electricity service Quality And Cost- Pending IBRD / P4990 Post Open - International 3,500,000.00 0.00 2021-06-10 2021-07-10 2021-09-13 2021-10-13 2021-11-27 2022-01-07 2022-02-11 2023-08-05 the expansion of the Network improvement Based Selection Implementation (Eastern connection to Northern) AO-MINEA - GEPE-210424- CS-QCBS / Consulting firm to Electricity service Quality And Cost- Pending carry out feasibility studies for IBRD / P4990 Post Open - International 1,500,000.00 0.00 2021-06-10 2021-07-10 2021-09-13 2021-10-13 2021-11-27 2022-01-31 2022-03-07 2023-08-29 improvement Based Selection Implementation the expansion of the Cabinda Network AO-MINEA - GEPE-210392- CS-QCBS / Owner's Engineer firm to supervise the works Electricity service Quality And Cost- Pending IBRD / P4990 Post Open - International 1,750,000.00 0.00 2021-05-17 2021-06-16 2021-08-20 2021-09-19 2021-11-03 2021-12-23 2022-01-27 2024-04-26 for rehabilitation and upgrade improvement Based Selection Implementation of Cuito and Quileva substations AO-MINEA - GEPE-210420- CS-QCBS / Consulting firm to Electricity service Quality And Cost- Pending prepare and implement the IBRD / P4990 Post Open - International 1,500,000.00 0.00 2021-06-08 2021-07-08 2021-09-11 2021-10-11 2021-11-25 2022-01-29 2022-03-05 2023-08-27 improvement Based Selection Implementation capacity building plan for RNT staff Page 2 AO-MINEA - GEPE-210411- CS-QCBS / Owner's Engineer firm to design, prepare bidding documents to Electricity service Quality And Cost- Pending IBRD / P4990 Post Open - International 1,300,000.00 0.00 2021-06-27 2021-07-27 2021-09-30 2021-10-30 2021-12-14 2022-02-17 2022-03-24 2024-06-21 contract the EPC and improvement Based Selection Implementation supervise Expansion and upgrade of the telecommunication network AO-MINEA - GEPE-210063- CS-QCBS / Owner's Engineer for revision of preliminary Electricity access expansion Quality And Cost- Pending design and supervision of IBRD / P4990 and improvement of revenue Prior Open - International 2,430,000.00 0.00 2021-04-15 2021-05-15 2021-07-19 2021-08-18 2021-10-02 2021-11-21 2021-12-26 2024-03-25 Based Selection Implementation works for distribution collection networks rehabilitation and expansion - Package B AO-MINEA - GEPE-210079- CS-QCBS / Owner's Engineer for revision of preliminary Electricity access expansion Quality And Cost- Pending design and supervision of IBRD / P4990 and improvement of revenue Prior Open - International 2,430,000.00 0.00 2021-04-15 2021-05-15 2021-07-19 2021-08-18 2021-10-02 2021-11-21 2021-12-26 2024-03-25 Based Selection Implementation works for distribution collection networks rehabilitation and expansion - Package C AO-MINEA - GEPE-210060- CS-QCBS / Owner's Engineer for revision of preliminary Electricity access expansion Quality And Cost- Pending design and supervision of IBRD / P4990 and improvement of revenue Prior Open - International 2,430,000.00 0.00 2021-04-15 2021-05-15 2021-07-19 2021-08-18 2021-10-02 2021-11-21 2021-12-26 2024-03-25 Based Selection Implementation works for distribution collection networks rehabilitation and expansion - Package A INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-MINEA - GEPE-123486- CS-INDV / Short-term Individual Environmental Consultant (for IBRD / P4990 Project management support Post Consultant Limited 70,000.00 110,837.99 Signed 2019-07-28 2019-07-25 2019-08-02 2019-08-01 2019-08-22 2019-08-25 2019-08-30 2019-10-28 2019-10-29 preparation of Environmental Selection and Social Management Framework - ESMF) AO-MINEA - GEPE-144993- Improvement of PRODEL’s Individual CS-INDV / Project Coordinator capacity and strengthening IBRD / P4990 Prior Consultant Open 240,000.00 297,336.90 Signed 2019-11-18 2019-11-14 2020-01-18 2020-02-21 2020-02-08 2020-07-21 2020-03-14 2020-08-07 2021-06-07 (Lead Staff, Project sustainable management of Selection Coordination Unit - PCU) generation plants Improvement of PRODEL’s AO-MINEA - GEPE-145487- Individual capacity and strengthening CS-INDV / Procurement IBRD / P4990 Prior Consultant Open 230,000.00 298,636.90 Signed 2019-11-18 2019-11-14 2020-01-18 2020-02-21 2020-02-08 2020-07-07 2020-03-14 2020-07-27 2021-06-07 sustainable management of Specialist Selection generation plants Improvement of PRODEL’s AO-MINEA - GEPE-145488- Individual capacity and strengthening CS-INDV / Financial IBRD / P4990 Prior Consultant Open 155,000.00 281,500.00 Signed 2019-11-18 2019-11-13 2020-01-18 2020-02-21 2020-02-08 2020-07-21 2020-03-14 2020-08-07 2021-06-07 sustainable management of Management Specialist Selection generation plants Improvement of PRODEL’s AO-MINEA - GEPE-191630- Individual capacity and strengthening Under CS-INDV / Social Safeguard IBRD / P4990 Post Consultant Open 175,000.00 0.00 2020-09-21 2020-09-24 2020-12-05 2020-12-26 2021-01-29 2022-01-29 sustainable management of Implementation Specialist Selection generation plants Improvement of PRODEL’s AO-MINEA - GEPE-191639- Individual capacity and strengthening Under CS-INDV / Environmental IBRD / P4990 Post Consultant Open 175,000.00 0.00 2020-09-21 2020-09-16 2020-12-05 2020-12-26 2021-01-30 2022-04-25 sustainable management of Implementation Specialist Selection generation plants Improvement of PRODEL’s AO-MINEA - GEPE-191619- Individual capacity and strengthening CS-INDV / Junior Procurement IBRD / P4990 Prior Consultant Limited 120,000.00 0.00 Canceled 2020-09-10 2020-11-03 2020-11-17 2021-01-07 2022-01-07 sustainable management of Specialist Selection generation plants AO-MINEA - GEPE-210042- CS-INDV / Individual consultant to assist in Individual Pending preparation of bidding IBRD / P4990 Project management support Post Consultant Open 50,000.00 0.00 2021-02-08 2021-04-24 2021-05-15 2021-06-19 2021-09-17 Implementation documents and bid evaluation Selection reports for the RPP (Revenue Protection Program) AO-MINEA - GEPE-210045- CS-INDV / Individual consultant to assist in Individual preparation of bidding Pending IBRD / P4990 Project management support Post Consultant Open 50,000.00 0.00 2021-01-11 2021-03-27 2021-04-17 2021-05-22 2021-11-18 documents and bid evaluation Implementation Selection reports for the distribution networks rehabilitation and expansion projects AO-MINEA - GEPE-210085- Improvement of PRODEL’s CS-INDV / Individual Individual capacity and strengthening consultant to prepare terms of IBRD / P4990 Post Consultant Open 50,000.00 0.00 Under Review 2021-04-05 2021-06-23 2021-06-19 2021-07-10 2021-08-14 2021-11-12 sustainable management of reference for the Owner's Selection generation plants Engineer AO-MINEA - GEPE-210361- CS-INDV / Individual Individual Pending consultant to prepare terms of IBRD / P4990 Project management support Post Consultant Open 50,000.00 0.00 2021-01-25 2021-04-10 2021-05-01 2021-06-05 2021-09-03 Implementation reference for the corporate Selection advisory services Individual AO-MINEA - GEPE-216418- Under IBRD / P4990 Project management support Post Consultant 120,000.00 0.00 2021-01-29 2021-03-24 2021-04-14 2021-05-19 2022-05-19 CS-INDV / Project Accountant Implementation Selection Page 3 AO-MINEA - GEPE-198004- CS-CDS / Technical training to IRSEA by MRC Consultants so that it will be able to fulfil Improvement of PRODEL’s its enhanced role in the capacity and strengthening implementation of the IBRD / P4990 Prior Direct Selection Direct 60,000.00 0.00 Canceled 2020-10-09 2020-10-19 2020-12-23 2021-06-21 sustainable management of Presidential Decree No generation plants 178/20 of 25 June 2020, for establishing, and periodically adjusting, revenue requirements. Improvement of PRODEL’s AO-MINEA - GEPE-204622- Individual capacity and strengthening CS-INDV / Procurement IBRD / P4990 Prior Consultant Limited 120,000.00 0.00 Canceled 2020-11-12 2021-01-21 2021-01-05 2021-01-19 2021-02-07 2021-08-06 sustainable management of Specialist Selection generation plants AO-MINEA - GEPE-226461- Individual CS-INDV / Technical Under IBRD / P4990 Project management support Post Consultant Open 200,000.00 0.00 2021-03-30 2021-05-07 2021-06-30 2021-07-21 2021-08-25 2022-08-25 Specialist/Distribution Implementation Selection Engineer (PCU staff) AO-MINEA - GEPE-226466- Individual CS-INDV / Technical Under IBRD / P4990 Project management support Post Consultant Open 200,000.00 0.00 2021-03-31 2021-06-23 2021-07-07 2021-07-28 2021-09-01 2022-09-01 Specialist/Transmission Implementation Selection Engineer (PCU Staff) AO-MINEA - GEPE-224718- Individual CS-INDV / Procurement IBRD / P4990 Project management support Prior Consultant Open 120,000.00 0.00 Canceled 2021-05-17 2021-08-21 2021-09-11 2021-10-16 2022-10-16 Specialist Selection AO-MINEA - GEPE-226474- CS-CDS / Technical Training to IRSEA for the IBRD / P4990 Project management support Post Direct Selection Direct 60,000.00 0.00 Under Review 2021-06-20 2021-06-24 2021-07-11 2021-09-14 2022-01-12 implementation of the Presidential Decree No. 178/20. AO-MINEA - GEPE-224718- Individual Under CS-INDV-2 / SENIOR IBRD / P4990 Project management support Prior Consultant Open 230,000.00 0.00 2021-06-13 2021-06-10 2021-09-17 2021-10-08 2021-11-12 2022-11-12 Implementation PROCUREMENT SPECIALIST Selection Page 4 PROCUREMENT PLAN (Textual Part) Project information: [Mali] [Reinsertion of Ex-Combatants Project] [P157233] Project Implementation agency: [Project Implementation Unit (PIU) of the National Disarmament, Demobilization, and Reinsertion Commission (NDDRC)] Date of the Procurement Plan: [01/28/2018] Period covered by this Procurement Plan: [02/15/2018 to 07/28/2019] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the [Decree No. 2015-3721 /MEF-SG dated October 22, 2015], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable]; Works: [is not applicable] Other Relevant Procurement Information. PROCUREMENT Mali : Mali Reinsertion of Ex-combatants Project PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2018-01-30 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157233 GPN Date: Project Name: Mali Reinsertion of Ex-combatants Project Loan / Credit No: IDA / D1680 ML Reinsertion of Ex-combatants Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CW-KID-03 / Tv. réalisation et équip. de 2 forages avec Request for Single Stage - One 2020-03- IDA / D1680 Community Rehabilitation Post Limited 68,970.00 68,226.31 Signed 2019-11-27 2020-03-11 2020-01-16 2020-06-16 système solaire à Tintiska et à Quotations Envelope 01 Tinta ghène région de Kidal CW-KID-14 / Travaux de surcreusement de puits Request for Single Stage - One 2020-12- pastoral à IDA / D1680 Community Rehabilitation Post Limited 43,103.00 44,118.22 Signed 2020-07-18 2020-10-15 2020-09-06 2020-12-24 Quotations Envelope 05 Anoumalène/aguelhoc dans la région de Kidal CW-TOM-07 / Tv réhabilitation du château du CSREF de Tombouctou ; Tv de Request for Single Stage - One 2020-03- IDA / D1680 Community Rehabilitation Post Limited 71,154.00 55,631.38 Signed 2019-12-04 2020-05-26 2020-01-23 2020-07-22 réalisation d’une ADS à Quotations Envelope 08 Alkama bangou à Nboura région de Tombouctou CW-KID-07 / Tv. réalisation et équip 1 puit à Request for Single Stage - One 2020-05- IDA / D1680 Community Rehabilitation Post Limited 20,688.00 22,193.82 Signed 2020-02-22 2020-05-11 2020-03-26 2020-07-02 Anhar/Tinzawatène commune Quotations Envelope 10 de Abeibara région de Kidal CW-KID-06 / Tv. réhab. du Request for Single Stage - One 2019-12- radier de amassine dans la IDA / D1680 Community Rehabilitation Post Limited 31,923.00 32,022.95 Signed 2019-10-23 2020-05-13 2019-11-25 2020-07-02 Quotations Envelope 25 région de Kidal CW-MEN-05 / Travaux de réhabilitation trois adductions d'eau sommaire (AES) à Inzougaz, Assew et Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 85,801.00 98,592.49 Signed 2020-07-29 2021-02-25 2020-09-17 2021-05-05 Tinazabène et de réalisation Quotations Envelope 16 d’une adduction d’eau à Wortakna dans la région de Ménaka CW-TOM-12 / Travaux de construction d'un forage Request for Single Stage - One 2020-12- équipé d'un château et pompe IDA / D1680 Community Rehabilitation Post Limited 41,500.00 46,633.87 Signed 2020-08-08 2020-11-02 2020-09-27 2021-01-05 Quotations Envelope 26 solaire à Faytawane dans la région de Tombouctou CW-TOM-13 / Travaux de réhabilitation du canal principale et équipement d'un Request for Single Stage - One 2020-11- IDA / D1680 Community Rehabilitation Post Limited 13,534.00 15,215.91 Signed 2020-08-08 2021-03-17 2020-09-27 2021-04-24 périmètre pour la culture du Quotations Envelope 26 riz à Mamadoukoyra dans la région de Tombouctou CW-GAO-14 / Travaux de surcreusement de 2 marres à Moudett et Intillit Nord à Moudett et Intillit, de construction d'une digue avec Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 37,931.00 40,092.36 Signed 2020-08-26 2021-02-08 2020-10-15 2021-03-25 ouvrage à submersion Quotations Envelope 29 controlée à Abba Koyra et de construction d'un parc de vaccination à Haoussa dans la région de Gao CW-MEN-03 / Travaux de réalisation et équipement Pending Request for Single Stage - One 2020-01- d’un forage à Adalwag IDA / D1680 Community Rehabilitation Post Limited 35,512.00 0.00 Implementat 2019-10-26 2019-11-28 Quotations Envelope 12 commune de Tidermène dans ion la région de Ménaka CW-KID-01 / Tv. Const. 3 salles de classe équipées 3 Request for Single Stage - One 2019-12- IDA / D1680 Community Rehabilitation Post Limited 46,552.00 48,580.83 Signed 2019-10-23 2020-04-01 2019-11-25 2020-05-21 latrines et bureau mag. à Quotations Envelope 25 Efereur région de Kidal CW-GAO-10 / Travaux de réalisation et équipement de 3 forages en pompe solaire à Request for Single Stage - One 2020-01- IDA / D1680 Community Rehabilitation Post Limited 171,914.00 168,511.94 Signed 2019-11-05 2020-03-09 2019-12-08 2020-04-24 Tabankorte à Almoustarat et Quotations Envelope 07 Nbeykoul lajoulla région de Gao CW-KID-10 / Travaux de construction d'une digue de Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 75,862.00 83,304.91 Signed 2020-07-21 2020-12-07 2020-09-09 2021-02-03 protection à Kidal aviation, Quotations Envelope 08 région de Kidal CW-TOM-14 / Travaux de construction de 2 salles de Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 39,326.00 40,628.28 Signed 2020-08-08 2020-10-09 2020-09-27 2021-01-15 classe à Milala dans la région Quotations Envelope 11 de Tombouctou CW-GAO-13 / Travaux de réalisation d’un périmètre maraicher pour la coopérative des femmes à Taboye et d’un Request for Single Stage - One 2021-01- IDA / D1680 Community Rehabilitation Post Limited 19,224.00 22,192.41 Signed 2020-08-22 2021-02-08 2020-10-11 2021-03-25 périmètre 3 hectares pour Quotations Envelope 09 l’association des groupements ruraux villageois à Gounga dans la région de Gao Page 1 CW-GAO-03 / Tv const. 2 magasins dans le marché Taboye Commune Taboye cercle Bourem , Tv Const. 6 Request for Single Stage - One 2020-01- IDA / D1680 Community Rehabilitation Post Limited 31,035.00 31,988.62 Signed 2019-11-02 2020-04-07 2019-12-05 2020-05-21 hangars dans le marché Quotations Envelope 04 TEMERA Commune de Temera cercle Bourem dans la région de Gao CW-GAO-04 / Travaux d’aménagement de la plaine Request for Single Stage - One 2020-01- de Moudakhane Commune de IDA / D1680 Community Rehabilitation Post Limited 77,204.00 75,723.89 Signed 2019-11-02 2020-04-30 2019-12-05 2020-06-24 Quotations Envelope 04 Taboye cercle Bourem dans la région de Gao CW-GAO-01 / Construction de 3 salles de classes, Bureau Request for Single Stage - One 2019-12- magasin et de 2 blocs de 3 IDA / D1680 Community Rehabilitation Post Limited 73,686.00 71,853.22 Signed 2019-11-03 2020-03-30 2019-12-06 2020-05-11 Quotations Envelope 12 latrines à Tindjirindjitane Tessit dans la région de Gao CW-GAO-11 / Travaux de réalisation et équipement Request for Single Stage - One 2020-07- d’un forage en PMH à IDA / D1680 Community Rehabilitation Post Limited 43,103.00 43,521.01 Signed 2020-03-29 2020-05-20 2020-05-18 2020-06-26 Quotations Envelope 17 Tinassamede cercle de Bourem dans la région de Gao CW-TOM-11 / Travaux de réhabilitation d'une dune Request for Single Stage - One 2020-01- ecole Oguenatt Ag ALWEYNA IDA / D1680 Community Rehabilitation Post Limited 25,862.00 26,781.47 Signed 2019-11-02 2020-04-06 2019-12-05 2020-05-22 Quotations Envelope 04 Ebanguimalane à GOSSI Gourma rharous CW-TOM-15 / Travaux d’équipement d'un forage en Request for Single Stage - One 2020-12- mini adduction d'eau à IDA / D1680 Community Rehabilitation Post Limited 39,326.00 41,422.17 Signed 2020-08-08 2020-11-02 2020-09-27 2020-12-24 Quotations Envelope 26 Amachachare à Imbodiki dans la région de Tombouctou CW-KID-02 / Tv. réalisation et équip. 2 forage avec Request for Single Stage - One 2020-03- IDA / D1680 Community Rehabilitation Post Limited 85,960.00 86,067.14 Signed 2019-11-27 2020-04-17 2020-01-16 2020-06-22 système solaire à Djanchassé Quotations Envelope 01 et à Takalout région de Kidal CW-TOM-04 / Travaux de fonçage d’un puit pastoral à Request for Single Stage - One 2020-03- IDA / D1680 Community Rehabilitation Post Limited 27,557.00 15,184.40 Signed 2019-11-27 2020-06-03 2020-01-16 2020-07-22 Sakarouratan à BER dans la Quotations Envelope 01 région de Tombouctou CW-TAO-03 / Travaux de Request for Single Stage - One 2020-01- construction d'un poste de IDA / D1680 Community Rehabilitation Post Limited 60,259.00 52,761.89 Signed 2019-10-30 2020-04-23 2019-12-02 2020-07-27 Quotations Envelope 31 santé avancé Taoudénit CW-MOP-06 / Travaux de réalisation de trois périmètres maraichers à simérou, à Mopti Pending Request for Single Stage - One 2020-11- pour les femmes et à Dia pour IDA / D1680 Community Rehabilitation Post Limited 158,814.00 0.00 Implementat 2020-07-06 2020-08-25 Quotations Envelope 23 l’association des femmes de ion Dia BENKOLA dans la région de Mopti CW-TAO-02 / Tv const. 3 salles classes bureau magasin et un bloc 3 latrines Foum Elba cercle de Foum Elba et Tv Request for Single Stage - One 2020-01- IDA / D1680 Community Rehabilitation Post Limited 139,102.00 152,039.31 Signed 2019-10-30 2020-04-01 2019-12-02 2020-07-22 const. 3 salles classes bureau Quotations Envelope 16 magasin et un bloc 3 latrines Al ourch cercle de Al ourch région de Taoudénit CW-MOP-04 / Tv 1 radier 50m kanibonzo: Const. clôture école diandiori Request for Single Stage - One 2019-12- Sokoura; Const. 1mag stoc. IDA / D1680 Community Rehabilitation Post Limited 103,917.00 111,420.67 Signed 2019-10-19 2020-06-04 2019-11-21 2020-07-28 Quotations Envelope 21 Ass. karanga Guiné;Const. salle d’obs. mag. au CSR de Bankass CW-KID-08 / Travaux de réalisation de deux (02) Pending Request for Single Stage - One 2020-11- forages équipés à Djalguit et IDA / D1680 Community Rehabilitation Post Limited 81,896.00 0.00 Implementat 2020-07-20 2020-08-25 Quotations Envelope 23 Tagorast dans la région de ion Kidal CW-KID-09 / Travaux de réalisation de trois (3) forages équipés de Système Solaire Request for Single Stage - One 2020-09- IDA / D1680 Community Rehabilitation Post Limited 129,300.00 136,059.86 Signed 2020-07-21 2020-11-02 2020-09-09 2020-12-24 àTidjazal, Intilit et Quotations Envelope 18 Abatolnmanit dans la région de Kidal CW-KID-11 / Travaux de réalisation et d’équipement de trois (3) puits citernes, de Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 85,344.00 87,581.96 Signed 2020-07-21 2020-12-07 2020-09-09 2021-02-01 château et système solaire à Quotations Envelope 08 Abuyou, Agazer et Ibadid dans la région de Kidal CW-KID-12 / Travaux de réalisation de deux forages Request for Single Stage - One 2020-09- équipés de Système Solaire à IDA / D1680 Community Rehabilitation Post Limited 86,206.00 91,106.07 Signed 2020-07-21 2020-11-16 2020-09-09 2021-01-07 Quotations Envelope 18 Tacharaght et Imasrakaden dans la région de Kidal CW-KID-15 / Travaux de Pending construction de la digue de Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 86,207.00 0.00 Implementat 2020-07-18 2020-09-06 protection d'Aguelhock dans Quotations Envelope 05 ion la région de Kidal Page 2 CW-MEN-06 / Travaux d’équipement en systéme d'adduction d'eau sommaire à Afaisawa, de forage à Inafere Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 79,870.00 80,382.27 Signed 2020-07-29 2020-10-08 2020-09-17 2020-12-22 et Tabakort, de réhabilitation Quotations Envelope 16 d’une adduction d'eau sommaire (AES) à Elangue dans la région de Ménaka CW-MEN-07 / Construction d'un parc de vaccination à Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 29,310.00 21,780.91 Signed 2020-07-29 2020-10-09 2020-09-17 2020-12-21 Andéraboukane dans la région Quotations Envelope 16 de Ménaka CW-MOP-07 / Travaux de Request for Single Stage - One 2020-11- réalisation d'un puits moderne IDA / D1680 Community Rehabilitation Post Limited 45,534.00 49,770.26 Signed 2020-07-11 2020-10-15 2020-08-30 2021-01-07 Quotations Envelope 28 dans la région de Mopti CW-TAO-04 / Travaux de Réalisation de deux (2) forges équipés de pompe solaire avec mini d'adduction d’eau Request for Single Stage - One 2021-09- IDA / D1680 Community Rehabilitation Post Limited 121,264.00 99,770.07 Signed 2019-10-30 2020-04-23 2019-12-02 2020-08-27 sommaire de 3 bornes Quotations Envelope 07 fontaines à Tinaghalhaj et à M’Back Semna dans le Cercle d’Araoune reion Taoudenit CW-MOP-05 / Tv. réalisat. d’un jardin d’arbres fruitiers à Request for Single Stage - One 2019-11- IDA / D1680 Community Rehabilitation Post Limited 35,873.00 40,955.29 Signed 2019-10-20 2020-06-09 2019-11-22 2020-08-18 Kanibonzo dans la région de Quotations Envelope 25 Mopti CW-GAO-12 / Travaux de réalisation d'un forage équipé de PMH à Tinassamede, d’un Request for Single Stage - One 2021-01- puits d'un à grand diamètre à IDA / D1680 Community Rehabilitation Post Limited 55,173.00 58,753.16 Signed 2020-08-22 2021-01-07 2020-10-11 2021-02-18 Quotations Envelope 09 Inamakka et d'un mini forage californien équipé motopompe dans la région de Gao CW-TOM-06 / Tv construction d’un mur de Request for Single Stage - One 2020-03- clôture du second cycle « IDA / D1680 Community Rehabilitation Post Limited 35,432.00 20,193.87 Signed 2019-12-04 2020-03-03 2020-01-23 2020-04-29 Quotations Envelope 08 yehia alkaya de Tombouctou » région de Tombouctou CW-MEN-02 / Travaux de construction et équipement de 3 salles de classes Request for Single Stage - One 2020-01- IDA / D1680 Community Rehabilitation Post Limited 50,695.00 53,513.15 Signed 2019-11-20 2020-04-06 2020-01-09 2020-06-04 équipées à Echaghane Quotations Envelope 13 commune de Tidèrmène dans la région de Ménaka CW-TOM-08 / Tv réalisation et équipement 1 forage en pompe solaire à Tabaye- Request for Single Stage - One 2020-02- IDA / D1680 Community Rehabilitation Post Limited 60,734.00 42,662.98 Signed 2019-11-19 2020-06-15 2020-01-08 2020-10-01 barite commune de Tilemsi Quotations Envelope 22 cercle Goundam région de Tombouctou CW-TOM-03 / Tv. de réhabilitation d'une AES par soufflage Tindaydaye GOSSI et Request for Single Stage - One 2020-01- IDA / D1680 Community Rehabilitation Post Limited 45,348.00 53,810.60 Signed 2019-11-02 2020-04-30 2019-12-05 2020-08-24 Tv. réalisation AES à Quotations Envelope 19 Tintahaten Gossi dans la région de Tombouctou CW-MOP-01 / Tv. d'Aménag. périmètre maraîcher avec mini adduction d’eau pour Request for Single Stage - One 2019-12- IDA / D1680 Community Rehabilitation Post Limited 51,080.00 53,745.67 Signed 2019-10-20 2021-03-05 2019-11-22 2020-04-03 l'association djiguiya de Quotations Envelope 22 Saoula à Djenne région de Mopti CW-TOM-10 / Travaux de réalisation et équipement d’un forage moderne en Request for Single Stage - One 2020-07- château d’eau et panneaux IDA / D1680 Community Rehabilitation Post Limited 42,362.00 38,587.68 Signed 2020-03-11 2020-04-14 2020-04-30 2020-07-17 Quotations Envelope 29 solaires à Djiri berra goungou cercle de Gourma-Rharous dans la région de Tombouctou CW-GAO-09 / Travaux de réalisation d'éclairage public à Request for Single Stage - One 2020-01- IDA / D1680 Community Rehabilitation Post Limited 67,839.00 68,430.32 Signed 2019-11-05 2020-03-19 2019-12-25 2020-05-20 Borno dans le cercle de Quotations Envelope 24 Bourem region de gao CW-MEN-01 / Tv. Const.salle de formation et de bureaux pour les femmes d'Anderaboukane Request for Single Stage - One 2020-02- IDA / D1680 Community Rehabilitation Post Limited 51,724.00 51,133.22 Signed 2019-11-20 2020-04-30 2020-01-09 2020-06-02 Tv const.maison et centre de Quotations Envelope 08 formation les jeunes d'Anderaboukane dans la région de Ménaka CW-GAO-15 / Travaux de réalisation deux forages Under Request for Single Stage - One 2021-01- équipés de pompe solaire à IDA / D1680 Community Rehabilitation Post Limited 79,151.00 0.00 Implementat 2020-08-26 2021-05-05 2020-10-15 Quotations Envelope 13 Taffassilite et à Injaguel dans ion la région de Gao CW-MEN-04 / Travaux de réalisation de deux forages dont un de 180mn à Agadèye Request for Single Stage - One 2020-12- et à Inaghade et d’un château IDA / D1680 Community Rehabilitation Post Limited 87,063.00 100,729.15 Signed 2020-07-29 2021-02-25 2020-09-17 2021-05-03 Quotations Envelope 16 d’eau sur puits existant à Tamtak dans la région de Ménaka CW-MOP-03 / TTravaux de Réalisation d’un forage avec Request for Single Stage - One 2020-01- adduction d’eau sommaire de IDA / D1680 Community Rehabilitation Post Limited 67,845.00 70,334.21 Signed 2019-10-20 2020-04-10 2019-11-22 2020-06-30 Quotations Envelope 06 Kende à Bondy région de Mopti Page 3 CW-TOM-09 / Travaux de réhabilitation d’un CSCOM, d’une école et d’un puit à Request for Single Stage - One 2020-03- IDA / D1680 Community Rehabilitation Post Limited 86,170.00 90,190.92 Signed 2019-12-04 2020-03-19 2020-01-23 2020-05-13 Teberent, Cercle de Gourma- Quotations Envelope 08 Rharous dans la région de Tombouctou CW-TOM-05 / Tv de réalisation et équipement d’un forage en pompe solaire Request for Single Stage - One 2020-01- à Tin Afferene à Gargando et IDA / D1680 Community Rehabilitation Post Limited 103,443.00 96,671.88 Signed 2019-11-02 2020-04-14 2019-12-05 2020-05-21 Quotations Envelope 19 Tv de réalisation d’une AES à Gargando dans la région de Tombouctou CW-TAO-01 / Tv. F/P Request for Single Stage - One 2020-01- Poteaux élect. Compt. Bouge IDA / D1680 Community Rehabilitation Post Limited 69,551.00 61,294.42 Signed 2019-10-30 2020-04-23 2019-12-02 2020-07-27 Quotations Envelope 01 Beha Taoudénit CW-GAO-06 / Travaux de réalisation et équipement d'un Request for Single Stage - One 2020-01- forage équipé d’une pompe IDA / D1680 Community Rehabilitation Post Limited 39,655.00 42,664.95 Signed 2019-11-05 2020-04-14 2019-12-08 2020-07-01 Quotations Envelope 22 solaire à Intilit commune de Tilemsi dans la région de Gao CW-KID-04 / Tv. réalisation et équip. 2 forages avec système solaire à Guljiat Request for Single Stage - One 2020-03- IDA / D1680 Community Rehabilitation Post Limited 90,258.00 90,327.27 Signed 2019-11-27 2020-04-27 2020-01-16 2020-07-03 Tinessako et Tagoraste Quotations Envelope 01 Achibogho dans la région de Kidal CW-GAO-02 / Tv const. 03 magasins de stockage de 4 m X 4 m chacun à Bara, Tabangaw et Tanal dans la Commune de BARA cercle Request for Single Stage - One 2020-01- IDA / D1680 Community Rehabilitation Post Limited 41,379.00 21,239.00 Signed 2019-11-02 2020-03-30 2019-12-05 2020-05-21 Ansongo , Tv const. d'un Quotations Envelope 04 magasin de stockage de 4 m X 4 m à Talataye dans la Commune de Talataye cercle Ansongo région de Gao CW-KID-13 / Travaux de réalisation d'un puit avec Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 26,002.00 27,568.46 Signed 2020-07-18 2020-10-15 2020-09-06 2020-12-24 équipement solaire à Tassick Quotations Envelope 05 dans la région de Kidal CW-TOM-16 / Travaux de construction d'un parc de Request for Single Stage - One 2020-12- IDA / D1680 Community Rehabilitation Post Limited 20,700.00 22,211.76 Signed 2020-08-08 2020-10-09 2020-09-27 2020-12-21 vaccination à Habougara dans Quotations Envelope 11 la région de Tombouctou CW-GAO-16 / Travaux de réalisation et équipement d'un Request for Single Stage - One 2021-02- forage sur le site de Zanzan à IDA / D1680 Community Rehabilitation Post Limited 15,716.00 53,861.22 Signed 2020-11-07 2021-02-25 2020-12-12 2021-04-09 Quotations Envelope 10 Bamba, cercle de Bourem dans la région de Gao CW-KID-16 / Travaux de réalisation de trois (3) forages Request for Single Stage - One 2021-02- de système solaire à Etambar, IDA / D1680 Community Rehabilitation Post Limited 154,201.00 156,709.85 Signed 2020-11-14 2021-02-22 2020-12-19 2021-04-26 Quotations Envelope 17 Inktikwa, Tamtack dans la commune urbaine de Kidal CW-GAO-17 / Construction de 4 Hangars, 02 blocs de 3 latrines et une adduction Pending d’eau sommaire (AES) au Request for Single Stage - One 2021-02- IDA / D1680 Community Rehabilitation Post Limited 92,491.00 0.00 Implementat 2020-11-07 2020-12-12 marché à bétail de Forgho, Quotations Envelope 10 ion Commune Rurale de SONI ALI BER, cercle de Gao, Région de Gao CW-GAO-18 / Construction de deux (2) forages équipés au profit des populations Request for Single Stage - One 2021-02- déplacées de retour des IDA / D1680 Community Rehabilitation Post Limited 90,576.00 97,837.06 Signed 2020-11-07 2021-02-05 2020-12-12 2021-04-08 Quotations Envelope 10 quartiers de Gadèye et Farandjirèye dans la commune urbaine de Gao CW-GAO-20 / Travaux de réalisation d'un forage équipé Pending de système solaire avec Request for Single Stage - One 2021-02- IDA / D1680 Community Rehabilitation Post Limited 46,478.00 0.00 Implementat 2020-11-07 2020-12-22 château d'eau à Quotations Envelope 20 ion Timbargotane, Commune d'Anchawadj, dans la région de Gao CW-GAO-21 / Travaux de réhabilitation du PIV de TONDOTHIRO (canal et OSC) Request for Single Stage - One 2021-03- IDA / D1680 Community Rehabilitation Post Limited 32,266.00 27,377.19 Signed 2020-11-14 2021-02-23 2020-12-19 2021-04-15 dans la commune de Quotations Envelope 19 Gounzourèye dans le cercle de Gao, Région de Gao CW-GAO-22 / Travaux de réhabilitation du Centre de santé communautaire des villages de Zindiga-Berrah Request for Single Stage - One 2021-03- IDA / D1680 Community Rehabilitation Post Limited 190,986.00 180,939.59 Signed 2020-11-14 2021-03-08 2020-12-19 2021-04-08 dans la commune Sony Ali Ber Quotations Envelope 19 et de réalisation d'une AES à Azalala Gindo - cercle de Gao, Région de Gao. CW-TOM-17 / Réalisation de deux forages de système de pompage avec mini réseau d’adduction d’eau pour le Request for Single Stage - One 2021-03- IDA / D1680 Community Rehabilitation Post Limited 141,037.00 146,528.82 Signed 2020-12-05 2021-03-08 2021-01-09 2021-04-16 village de Sondage et Quotations Envelope 10 Tejakanite, commune de Léré, cercle de Niafunké dans la région de Tombouctou. Page 4 CW-TOM-19 / Travaux de réhabilitation d’une école et de construction d’un poste de Request for Single Stage - One 2021-04- santé à Nya Fraction Kel IDA / D1680 Community Rehabilitation Post Limited 56,265.00 65,068.03 Signed 2020-12-05 2019-10-14 2021-01-09 2021-04-20 Quotations Envelope 09 Tinakawwatt dans la commune rurale de Léré dans la région de Tombouctou. CW-GAO-23 / Construction de trois (3) salles de classe bureau, magasin et 2 blocs de Under Request for Single Stage - One 2021-04- latrine au profit des IDA / D1680 Community Rehabilitation Post Limited 72,121.00 0.00 Implementat 2020-12-02 2021-01-06 Quotations Envelope 06 populations déplacées dans la ion Commune de Inchawadji Région de Gao CW-KID-18 / Travaux de réalisation d'une mini adduction d'eau à Teknewene Request for Single Stage - One 2021-07- IDA / D1680 Community Rehabilitation Post Limited 90,000.00 90,798.97 Signed 2020-11-07 2021-03-30 2021-01-02 2021-06-01 dans la commune rurale Quotations Envelope 01 d'Anafis dans la région de Kidal CW-TAO-38 / Travaux de réalisation de deux (02) foragés équipés de systèmes solaires à Boukarcha Request for Single Stage - One 2021-04- IDA / D1680 Community Rehabilitation Post Limited 127,273.00 127,753.04 Signed 2020-11-10 2021-02-09 2021-01-05 2021-03-31 (commune de Liraka) et Quotations Envelope 05 Alfakrouna (commune de Alfakrouna) dans la région de Taoudéni CW-TAO-39 / Travaux d'electrification du CSCOM d'Arouane, d'éclairage de la rue principale du village Request for Single Stage - One 2021-07- d'Arouane et Réalisation d'une IDA / D1680 Community Rehabilitation Post Limited 69,090.00 70,289.74 Signed 2020-11-18 2021-02-25 2021-01-13 2021-03-31 Quotations Envelope 12 AES en forage équipé à Hassi Ouldad Sleymane (cercle de Arouane) dans la région de Taoudénit CW-TAO-23 / Travaux de réalisation de dix (10) adductions d'eau sommaire Under respectivement dans les Single Stage - One 2021-09- IDA / D1680 Community Rehabilitation Post Request for Bids Open - National 447,212.00 0.00 Implementat 2020-11-20 2021-02-01 2020-11-25 2021-06-02 2021-01-06 2021-03-19 2021-02-05 2021-03-23 2021-03-12 cercles de Al Ourch, Foum Envelope 08 ion Elba, Achourate, Bouge Béha et Taoudénit dans la région de Taoudénit CW-TOM-32 / Travaux de réhabilitation d'un périmètre Pending rizicole de 15 HA au profit de Request for Single Stage - One 2021-07- IDA / D1680 Community Rehabilitation Post Limited 40,964.00 0.00 Implementat 2020-11-21 2021-01-16 l'association paysanne Quotations Envelope 15 ion "CONDEYE" de Toya dans la Région de Tombouctou CW-MOP-02 / Travaux d'Aménag. de la marre de Request for Single Stage - One 2019-12- IDA / D1680 Community Rehabilitation Post Limited 78,144.00 80,065.36 Signed 2019-10-20 2020-03-09 2019-11-22 2020-04-17 Bergue Kounari à Manaco Quotations Envelope 22 région de Mopti CW-GAO-35 / Travaux de réalisation d'un forage équipé de système solaire avec château d'eau à Pending Timbargotane, Commune Request for Single Stage - One 2021-07- IDA / D1680 Community Rehabilitation Post Limited 88,175.00 0.00 Implementat 2020-11-15 2021-01-10 d'Anchawadj, et d'une Quotations Envelope 09 ion d'adduction d'eau potable par le pompage solaire à Tilemsi , Commune rurale de Telemsi, cercle de Gao,région de GaO CW-KID-40 / Travaux de réalisation de deux forages équipés de système solaire à Request for Single Stage - One 2021-07- IDA / D1680 Community Rehabilitation Post Limited 138,182.00 139,228.38 Signed 2020-11-11 2021-02-22 2021-01-06 2021-04-06 TAZARGHAFT et INFEFELE Quotations Envelope 05 dans la commune de Kidal, région de Kidal CW-TOM-23 / Travaux de réalisation d'un forage équipé de système solaire pour la Pending coopérative des producteurs Request for Single Stage - One 2021-07- IDA / D1680 Community Rehabilitation Post Limited 27,849.00 0.00 Implementat 2020-11-14 2021-01-09 de gomme arabique sur 10H à Quotations Envelope 08 ion Rharous/Sidi Oumar Adiawiakoye - Région de Tombouctou CW-MEN-45 / Aménagement de la marre de la ville de Request for Single Stage - One 2021-07- MENAKA contre les IDA / D1680 Community Rehabilitation Post Limited 81,818.00 89,189.22 Signed 2020-11-21 2021-04-16 2021-01-16 2021-06-01 Quotations Envelope 15 inondations - Région de Ménaka CW-MEN-37 / Travaux de réalisation de deux (02) forages équipés de système Request for Single Stage - One 2021-07- IDA / D1680 Community Rehabilitation Post Limited 127,273.00 131,526.44 Signed 2020-11-10 2021-02-25 2021-01-05 2021-05-10 solaire à Charbaley et Ibaram Quotations Envelope 04 Dabakar dans la commune de Ménaka - Région de Ménaka CW-GAO-44 / Travaux de réalisation d'éclairage public à Request for Single Stage - One 2021-07- IDA / D1680 Community Rehabilitation Post Limited 71,455.00 69,932.20 Signed 2020-11-25 2021-02-23 2021-01-20 2021-04-13 Bara - commune rurale de Quotations Envelope 19 Bara - Région de Gao CW-TOM-48 / Travaux de construction de magasin de stockage à Kadago Commune Request for Single Stage - One 2021-03- IDA / D1680 Community Rehabilitation Post Limited 14,532.00 14,328.34 Signed 2020-11-07 2021-02-22 2021-01-02 2021-03-31 rurale de de Ouinerden - Quotations Envelope 03 cercle de Gourma Rharous - Région de Tombouctou Page 5 CW-TAO-37 / Travaux de réalisation et équipement d'une unité pour la valorisation de la gomme Request for Single Stage - One 2021-04- IDA / D1680 Community Rehabilitation Post Limited 51,455.00 50,759.96 Signed 2020-11-07 2021-02-08 2021-01-02 2021-03-31 arabique au profit de Quotations Envelope 02 l'association des femmes de Nibkit - cercle de Al Ourche dans la région de Taoudénit CW-GAO-19 / Travaux de réalisation d'un (1) forage Request for Single Stage - One 2021-02- équipé à Taziguizit Commune IDA / D1680 Community Rehabilitation Post Limited 49,140.00 48,959.02 Signed 2020-11-07 2021-02-24 2020-12-12 2021-03-30 Quotations Envelope 10 de Talataye, cercle d'Ansongo dans la région de Gao. CW-KID-17 / Travaux de réalisation de deux (2) forages équipés d'un système solaire Request for Single Stage - One 2021-03- sur le site de Weilalam dans la IDA / D1680 Community Rehabilitation Post Limited 96,019.00 95,707.24 Signed 2020-11-14 2021-02-22 2020-12-19 2021-03-10 Quotations Envelope 19 commune d'Aguelhoc, cercle de Tessalit dans la région de Kidal CW-TOM-18 / Réalisation d’un forage équipé au Pending Request for 2021-03- bénéfice de la fraction Dag IDA / D1680 Community Rehabilitation Post 57,028.00 0.00 Implementat 2020-12-05 2021-01-09 Quotations 10 Baya sis à Goundam dans la ion région de Tombouctou. CW-TOM-20 / Travaux de réalisation de deux forages équipés au profit des réfugiés installés à Gossi et là 'école Request for Single Stage - One 2021-03- IDA / D1680 Community Rehabilitation Post Limited 88,461.00 88,467.80 Signed 2020-12-05 2021-02-09 2021-01-19 2021-03-25 fondamentale publique de Quotations Envelope 20 Gourzouguèye, cercle de Gourma Rharous dans la région de Tombouctou CW-TOM-49 / Travaux de réalisation de deux forages Request for équipés de pompe solaire à Quotations - Small Pending Request for Single Stage - One 2021-09- Tadarasse /Acharane et IDA / D1680 Community Rehabilitation Post Limited Works 90,637.00 0.00 Implementat 2021-05-29 2021-07-17 Quotations Envelope 15 Louteid, commune rurale (Emergency) SPD - ion d'Essakane dans la région de Competitive Tombouctou CW-GAO-31 / Réalisation Request for d'un périmètre maraicher à Quotations - Small Request for Single Stage - One 2021-03- Tin Joulgame dans la IDA / D1680 Community Rehabilitation Post Limited Works 89,839.00 91,972.44 Signed 2020-10-11 2021-02-24 2020-12-06 2021-04-19 Quotations Envelope 06 commune rurale de Tilemsi - (Emergency) SPD - Région de Gao Competitive CW-GAO-45 / Travaux de Request for réalisation d'un forage équipé Quotations - Small Pending Request for Single Stage - One 2021-08- à Inkourou dans la commune IDA / D1680 Community Rehabilitation Post Limited Works 39,478.00 0.00 Implementat 2021-05-29 2021-07-10 Quotations Envelope 24 rurale de Anchawadji dans la (Emergency) SPD - ion région de Gao Competitive CW-TOM-41 / Construction d'un centre de formation et Request for d'encadrement des jeunes à Quotations - Small Pending Zendjina Koyra et de la clôture Request for Single Stage - One 2021-09- IDA / D1680 Community Rehabilitation Post Limited Works 56,364.00 0.00 Implementat 2021-05-31 2021-07-26 du second cycle Abdoulaye Quotations Envelope 24 (Emergency) SPD - ion Soumaguel de Gourma Competitive Rharous - Région de Tombouctou GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GO-REF-7 / Achat de matériels informatiques pour Project Management Support Pending Request for Single Stage - One l’UEP et de matériels de IDA / D1680 to Project Implementation Post Limited 47,681.00 0.00 Implementati 2018-03-09 2018-05-04 2018-05-19 Quotations Envelope communication et de Unit on sensibilisation GO-REF-4 / Acquisition de 2 Project Management Support Pending Request for Single Stage - One Véhicules station wagon pour IDA / D1680 to Project Implementation Post Limited 144,928.00 0.00 Implementati 2018-04-09 2018-06-04 2018-07-04 Quotations Envelope les missions de l'UEP Unit on GO-REF-5 / Acquisition de Project Management Support Pending Request for Single Stage - One groupe électrogène de 50 KVA IDA / D1680 to Project Implementation Post Limited 24,155.00 0.00 Implementati 2018-03-25 2018-05-20 2018-06-04 Quotations Envelope pour l’UEP Unit on GO-REF-6 / Aquisition de 3 Project Management Support Pending Request for Single Stage - One motos pour chauffeurs et IDA / D1680 to Project Implementation Post Limited 2,899.00 0.00 Implementati 2018-05-29 2018-07-24 2018-08-08 Quotations Envelope coursier Unit on ML-PREC-51762-GO-RFB / Acquisition, transport, Stockage, distribution de Kits Pending Reinsertion Support to Single Stage - One de demarrage pour la IDA / D1680 Post Request for Bids Open - International 1,920,000.00 0.00 Implementati 2018-06-15 2018-06-20 2018-08-01 2018-08-11 2018-09-08 2018-12-07 Demobilized Ex-combatants Envelope réinsertion des Ex on combattants dans les 6 régions GO-REF-11 / Confection Project Management Support Pending Agenda, Calendrier, cartes de Request for Single Stage - One IDA / D1680 to Project Implementation Post Limited 10,000.00 0.00 Implementati 2018-12-14 2019-01-02 2019-01-17 visites et gadgets de Quotations Envelope Unit on communication GO-TAO-01 / Acq 20 Pending Request for Single Stage - One décortiqueuses Almatla région IDA / D1680 Community Rehabilitation Post Limited 44,414.00 0.00 Implementati 2019-10-30 2019-12-02 2020-05-30 Quotations Envelope de Taoudénit on Page 6 GO-TOM-01 / Acq Grpes Moto pompes à Gourzouguèye et Tourchawane; à 10 groupement maraichers Request for Single Stage - One IDA / D1680 Community Rehabilitation Post Limited 129,656.00 113,998.90 Terminated 2019-12-18 2020-02-10 2020-02-06 2020-04-10 2020-03-07 féminins Banikane Niafunké; Quotations Envelope pour les ass.« Aniya de thiaye et diékabara de sandy » de Koumayra ; à 10 groupements féminins de Ngorkou région de Tombouctou GO-TOM-02 / Acquisition de 3 moulins et de 7 décortiqueuses aux Request for Single Stage - One IDA / D1680 Community Rehabilitation Post Limited 25,483.00 21,592.32 Signed 2019-11-02 2020-02-10 2019-12-05 2020-03-24 2020-01-04 associations de femmes de Quotations Envelope Diré dans la région de Tombouctou GO-TOM-06 / Acquisition d'animaux pour la reconstitution de cheptel au profit des jeunes à risques de Request for Single Stage - One 4 fractions d’éleveurs à Lafia IDA / D1680 Community Rehabilitation Post Limited 42,414.00 39,880.09 Signed 2019-11-02 2020-07-30 2019-12-05 2020-10-12 2019-12-08 Quotations Envelope et au profit des communautés d’éleveurs de Gossi cercle de Gourma-Rharous dans la région de Tombouctou GO-MEN-04 / Acquisition d’animaux pour la reconstitution de cheptel à Request for Single Stage - One Tiderméne au profit de 107 IDA / D1680 Community Rehabilitation Post Limited 34,229.00 20,606.59 Signed 2020-07-25 2020-12-07 2020-09-13 2021-04-15 2020-10-13 Quotations Envelope familles et des communautés de Tinabaw dans la région de Ménaka GO-REF-2 / Acquisition Pending équipement du Système Reinsertion Support to Request for Single Stage - One IDA / D1680 Post Limited 64,412.00 0.00 Implementati 2018-04-07 2018-05-17 2018-07-01 d’Information et de Gestion Demobilized Ex-combatants Quotations Envelope on (SIG) GO-MOP-04 / Acq. Mob. Scolaires des écoles Request for Single Stage - One IDA / D1680 Community Rehabilitation Post Limited 12,036.00 12,819.83 Signed 2019-10-20 2020-06-04 2019-11-22 2020-07-08 2019-12-22 Commune Soubala cercle de Quotations Envelope bankass région de Mopti GO-MEN-03 / Acq Equip CSCOM de Emiss-Emiss Request for Single Stage - One IDA / D1680 Community Rehabilitation Post Limited 34,479.00 33,093.19 Signed 2019-10-27 2020-06-03 2019-11-29 2020-08-20 2019-12-29 commune de Inékar région de Quotations Envelope Ménaka Project Management Support Pending GO-REF-10 / Fourniture de Request for Single Stage - One IDA / D1680 to Project Implementation Post Limited 11,667.00 0.00 Implementati 2018-12-12 2018-12-29 2019-01-13 Comsommables de Bureau Quotations Envelope Unit on GO-GAO-01 / Acquisition d’animaux au bénéfice de Under Request for Single Stage - One trois groupements d’éleveurs IDA / D1680 Community Rehabilitation Post Limited 11,379.00 13,262.98 Implementati 2020-08-26 2021-01-04 2020-10-15 2020-11-14 Quotations Envelope de Tinahamma dans la région on de Gao GO-MOP-05 / Acquisition d’animaux pour la société coopérative à Guidjo Sare, Pending Single Stage - One l'association alliance à IDA / D1680 Community Rehabilitation Post Request for Bids Open - National 151,456.00 0.00 Implementati 2020-05-31 2020-06-07 2020-07-19 2020-08-18 2020-09-22 2021-03-21 Envelope Teninkou et l’association on Yiriwere mayo Togoro à Sossobe de la région de Mopti GO-MEN-01 / Acq.petits ruminants reconst.cheptel , 540 personnes victimes à Izgarate ; 40 personnes victimes à Tabankort ; 30 Request for Single Stage - One IDA / D1680 Community Rehabilitation Post Limited 86,007.00 88,326.20 Signed 2019-10-12 2020-02-12 2019-11-14 2020-04-13 2019-12-14 personnes victimes à Quotations Envelope Infoukaretane ; 317 personnes victimes à Wassaifi et 107 familles à Tidermène dans la région de Menaka GO-MOP-01 / Acq. animaux Comm.villag Diankabou Kombomé; comm.villag Gathilomou; femmes Diondiori ; coop Teninkou; Single Stage - One coop multif Hairé Boni ; grpmt IDA / D1680 Community Rehabilitation Post Request for Bids Open - National 296,931.00 318,540.32 Signed 2019-10-31 2020-06-10 2019-11-05 2021-06-06 2019-12-05 2020-07-30 2019-12-20 2020-08-10 2020-01-10 2020-12-01 2020-02-24 Envelope village mondoro ; éleveurs Hairé Boni ; ass. « yankouna haw ga goy Hombori; jeunes éleveurs de fatoma région Mopti GO-REF-1 / Acquisition des matériels, équipments et Reinsertion Support to Single Stage - One moyens de formation des Ex- IDA / D1680 Post Request for Bids Open - National 240,000.00 187,657.46 Signed 2018-04-15 2020-07-06 2018-04-20 2021-06-06 2018-05-20 2020-08-24 2018-05-27 2020-09-04 2018-06-24 2021-01-06 2018-07-24 Demobilized Ex-combatants Envelope Combattants dans les 6 régions GO-TAO-02 / Acquisition de petits ruminants pour les Request for Single Stage - One femmes de Taoudéni et les IDA / D1680 Community Rehabilitation Post Limited 82,844.00 84,913.59 Signed 2020-08-01 2020-10-09 2020-09-20 2020-12-21 2020-10-20 Quotations Envelope jeunes à Al Ourch dans la région de Taoudénit GO-REF-8 / Equipement de Project Management Support Pending Request for Single Stage - One la salle de conférence de l’UEP IDA / D1680 to Project Implementation Post Limited 8,293.00 0.00 Implementati 2018-03-25 2018-05-20 2018-06-09 Quotations Envelope et petits equipements Unit on ML-PREC-175183-GO-DIR / Project Management Support Pending Equipement de la salle de IDA / D1680 to Project Implementation Post Direct Selection Direct 20,000.00 0.00 Implementati 2020-05-28 2020-06-02 2020-06-17 2020-06-24 conférence de l'UEP PREC en Unit on solution de vidéoconférence Page 7 GO-MOP-06 / Acquisition d’animaux pour la reconstitution du cheptel au profit de Ass de femmes et jeunes des villages de Single Stage - One Darawal,Wamy et Koubel; Ass IDA / D1680 Community Rehabilitation Post Request for Bids Open - National 192,636.00 196,010.10 Signed 2020-10-05 2021-06-02 2020-10-10 2021-06-04 2020-11-21 2021-01-22 2020-12-21 2021-01-27 2021-01-25 2021-02-19 2021-07-24 Envelope des femmes et jeunes du village de Boni ; groupement de femmes des villages de Douna et de Niagassadiou Cercle Douenza GO-MOP-08 / Acquisition d’animaux pour la reconstitution de cheptel au profit des groupements Request for Single Stage - One /associations des femmes et IDA / D1680 Community Rehabilitation Post Limited 106,355.00 104,070.65 Signed 2020-11-07 2020-11-02 2021-01-01 2020-12-24 2021-03-02 Quotations Envelope jeunes des villages d’Aldouma, Tonou et de Toungourou, cercle de Koro dans la région de Mopti GO-GAO-02 / Acquisition d'une ambulance médicalisée Under Request for Single Stage - One de type 4x4 pour l'hopital IDA / D1680 Community Rehabilitation Post Limited 60,041.00 0.00 Implementati 2020-11-07 2020-12-12 2021-02-10 Quotations Envelope Hangadoumba Moulaye on TOURE de Gao GO-GAO-22 / Fourniture de : matériels de maraichage et agricole aux femmes de l'Ass du Sahel - Bourem; matériel de séchage et Pending Request for Single Stage - One commercialisation de poisson IDA / D1680 Community Rehabilitation Post Limited 85,285.00 0.00 Implementati 2020-11-17 2021-01-12 2021-07-11 Quotations Envelope à la coopérative des on vendeuses de poissons de Gao; de matériels agro sylvo pastoral pour jeunes de bamba GO-MEN-25 / équipements et Réinsertion de 20 Request for Single Stage - One IDA / D1680 Community Rehabilitation Post Limited 50,591.00 50,734.57 Signed 2020-11-07 2021-05-05 2021-01-02 2021-06-07 2021-07-01 associations de femmes en Quotations Envelope coupe couture à Alfakrou GO-GAO-44 / Acquisition d'équipement médical pour le Request for Single Stage - One IDA / D1680 Community Rehabilitation Post Limited 89,091.00 89,163.08 Signed 2020-11-22 2021-02-22 2021-01-17 2021-04-09 2021-07-16 Centre de référence du cercle Quotations Envelope de Gao GO-MEN-44 / Acquisition d'animaux pour la reconstitution du cheptel respectivement pour 40 Pending familles dans le village de Single Stage - One IDA / D1680 Community Rehabilitation Post Request for Bids Open - National 220,909.00 0.00 Implementati 2020-10-12 2020-10-27 2020-11-26 2020-12-16 2021-01-06 2021-03-07 Inwelane, 20 familles du Envelope on village d'Inticha, 20 familles du villages de Tabankorte,, 20 familles du village du village de Imisdounane - Ménaka GO-MEN-05 / Acquisition d’équipements pour les unités de savonnerie et de tannerie, des moulins au profit des Request for Single Stage - One IDA / D1680 Community Rehabilitation Post Limited 72,115.00 74,032.66 Signed 2020-09-06 2021-04-06 2020-10-18 2021-05-28 2020-12-17 groupements de femmes des Quotations Envelope communes de Ménaka, Andéranboukane et Intadeyné dans la région de Ménaka GO-GA0-28 / Equipement Pending Request for Single Stage - One d'une unité laitière à Ansongo IDA / D1680 Community Rehabilitation Post Limited 19,135.00 0.00 Implementati 2021-05-31 2021-07-12 2021-08-11 Quotations Envelope dans la région de Gao on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GO-REF-9 / Acquisition et Project Management Support Pending installation d'un logiciel de Request for Single Stage - One IDA / D1680 to Project Implementation Post Open - National 59,581.00 0.00 Implementati 2018-04-14 2018-05-26 2021-05-25 comptabilité pour le projet et Quotations Envelope Unit on formation des utilisateurs NC-TAO-01 / Formation en Request for Single Stage - One chantier école de 120 jeunes IDA / D1680 Community Rehabilitation Post Limited 48,906.00 95,816.28 Signed 2020-11-22 2021-02-16 2021-01-17 2021-04-15 2021-05-17 Quotations Envelope dans la région de Taoudénit CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-REF-2 / P.E pour l'Encadrement, l'Appui conseil, l'Orientation et dispense de Reinsertion Support to Quality And Cost- IDA / D1680 Prior Open - International 1,000,000.00 0.00 Canceled 2018-02-06 2018-02-11 2018-03-12 2018-04-21 2018-04-28 2018-05-15 2018-06-19 2019-06-19 Kit de formation aux ex- Demobilized Ex-combatants Based Selection combattants démobilisés dans la région de Mopti. CS-REF-3 / P.E pour l'Encadrement, l'Appui conseil, l'Orientation et dispense de Reinsertion Support to Quality And Cost- IDA / D1680 Prior Open - International 1,000,000.00 0.00 Canceled 2018-02-06 2018-02-11 2018-03-12 2018-04-21 2018-04-28 2018-05-15 2018-06-19 2019-06-19 Kit de formation aux ex- Demobilized Ex-combatants Based Selection combattants démobilisés dans la région de Gao Page 8 CS-REF-5 / P.E pour l'Encadrement, l'Appui conseil, l'Orientation et dispense de Reinsertion Support to Quality And Cost- IDA / D1680 Prior Open - International 1,000,000.00 0.00 Canceled 2018-02-06 2018-02-11 2018-03-12 2018-04-21 2018-04-28 2018-05-15 2018-06-19 2019-06-19 Kit de formation aux ex- Demobilized Ex-combatants Based Selection combattants démobilisés dans la région de Kidal. CS-REF-7 / P.E pour l'Encadrement, l'Appui conseil, l'Orientation et dispense de Reinsertion Support to Quality And Cost- IDA / D1680 Prior Open - International 1,000,000.00 0.00 Canceled 2018-02-06 2018-02-11 2018-03-12 2018-04-21 2018-04-28 2018-05-15 2018-06-19 2019-06-19 Kit de formation aux ex- Demobilized Ex-combatants Based Selection combattants démobilisés dans la région de Taoudenit. CS-REF-9 / Recrutement des Prestataires d'appui au Reinsertion Support to Quality And Cost- Pending démarrage des associations IDA / D1680 Post Open - International 300,000.00 0.00 2018-07-18 2018-07-23 2018-08-20 2018-09-17 2018-09-22 2018-10-11 2018-11-15 2018-12-30 Demobilized Ex-combatants Based Selection Implementation économiques et des coopératives CS-REF-10 / Recrutement des Prestataires pour Reinsertion Support to Quality And Cost- Pending IDA / D1680 Post Open - International 600,000.00 0.00 2018-03-30 2018-04-04 2018-05-02 2018-05-30 2018-06-06 2018-06-23 2018-07-28 2019-07-28 Dispense des activités d'appui Demobilized Ex-combatants Based Selection Implementation à la réinsertion sociale CS-REF-11 / Contrat de Consultant Reinsertion Support to Pending l'évaluation annuelle IDA / D1680 Post Qualification Open - National 60,000.00 0.00 2018-06-19 2018-07-10 2018-08-23 2018-09-22 2018-10-27 2019-04-25 Demobilized Ex-combatants Implementation Indépendante (Audit externe) Selection CS-REF-8 / Recrutement d'un consultant pour l'appui psycho social en faveur des ex Consultant Reinsertion Support to Pending combattants démobilisés IDA / D1680 Post Qualification Open - International 45,480.00 0.00 2018-04-22 2018-05-06 2018-05-27 2018-06-03 2018-07-04 2019-07-04 Demobilized Ex-combatants Implementation souffrant de maladies psycho Selection sociales et de troubles mentaux CS-REF-25 / P.E N°02 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to Pending IDA / D1680 Post Qualification Open - National 120,000.00 0.00 2019-10-15 2019-10-30 2019-11-24 2019-12-09 2019-12-30 2020-12-29 Kit de formation aux ex- Demobilized Ex-combatants Implementation Selection combattants démobilisés dans la région de Taoudenit. CS-REF-22 / P.E N°02 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - National 120,000.00 0.00 Under Review 2019-10-15 2019-02-27 2019-10-30 2019-11-24 2019-12-09 2019-12-30 2020-12-29 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Tombouctou. CS-REF-23 / P.E N°02 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - National 120,000.00 0.00 Under Review 2019-10-15 2019-02-27 2019-10-30 2019-11-24 2019-12-09 2019-12-30 2020-12-29 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Kidal. CS-REF-18 / P.E pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - National 120,000.00 0.00 Under Review 2019-10-06 2019-02-27 2019-10-21 2019-11-15 2019-11-30 2019-12-21 2020-12-20 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Taoudenit. CS-REF-17 / P.E N°01 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - National 120,000.00 0.00 Under Review 2019-10-16 2019-02-27 2019-10-31 2019-11-25 2019-12-10 2019-12-31 2020-12-30 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Kidal. CS-REF-24 / P.E N°02 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - National 120,000.00 0.00 Under Review 2019-10-15 2019-02-27 2019-10-30 2019-11-24 2019-12-09 2019-12-30 2020-12-29 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Menaka. CS-REF-20 / P.E N°02 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - National 120,000.00 0.00 Under Review 2019-10-15 2019-02-27 2019-10-30 2019-11-24 2019-12-09 2019-12-30 2020-12-29 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Mopti. CS-REF-21 / P.E N°02 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - National 120,000.00 0.00 Under Review 2019-10-16 2019-02-27 2019-10-31 2019-11-25 2019-12-10 2019-12-31 2020-12-30 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Gao. CS-REF-14 / P.E N°01 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to Under IDA / D1680 Post Qualification Open - National 120,000.00 0.00 2019-10-15 2019-02-27 2019-10-30 2019-11-24 2019-12-09 2019-12-30 2020-12-29 Kit de formation aux ex- Demobilized Ex-combatants Implementation Selection combattants démobilisés dans la région de Mopti. CS-REF-15 / PE N°01 pour l'Encadrement l'Appui conseil Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - National 120,000.00 0.00 Under Review 2019-10-15 2019-02-27 2019-10-30 2019-11-24 2019-12-09 2019-12-30 2020-12-29 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Gao CS-REF-31 / Recrutement d'un Consultant dans la Consultant région de Mopti pour IDA / D1680 Community Rehabilitation Post Qualification Open - National 45,208.00 38,337.14 Signed 2019-10-14 2019-10-16 2019-10-29 2021-05-10 2019-11-20 2020-02-20 2019-12-05 2020-03-12 2019-12-26 2021-05-06 2020-06-23 Etudes/Suivi et Contrôle dans Selection le cadre de l'execution des sous projets de la composante 3 Page 9 CS-REF-32 / Recrutement d'un Consultant dans la Consultant région de Gao pour IDA / D1680 Community Rehabilitation Post Qualification Open - National 30,731.00 0.00 Under Review 2019-10-04 2019-10-16 2019-10-19 2019-11-13 2019-11-28 2019-12-19 2020-06-16 Etudes/Suivi et Contrôle dans Selection le cadre de l'execution des sous projets de la composante 3 CS-REF-33 / Recrutement d'un Consultant dans la Consultant région de Kidal pour IDA / D1680 Community Rehabilitation Post Qualification Open - National 27,166.00 0.00 Under Review 2019-10-04 2019-10-21 2019-10-19 2019-11-13 2019-11-28 2019-12-19 2020-06-16 Etudes/Suivi et Contrôle dans Selection le cadre de l'execution des sous projets de la composante 3 CS-REF-34 / Recrutement d'un Consultant dans la région de Tombouctou pour Consultant Etudes/Suivi et Contrôle dans IDA / D1680 Community Rehabilitation Post Qualification Open - National 45,283.00 49,961.52 Signed 2019-10-04 2019-10-21 2019-10-19 2020-11-03 2019-11-13 2020-02-12 2019-11-28 2020-04-28 2019-12-19 2020-06-30 2020-06-16 le cadre de l'execution des Selection sous projets de la composante 3 CS-REF-35 / Recrutement d'un Consultant dans la Consultant région de Menaka pour IDA / D1680 Community Rehabilitation Post Qualification Open - National 18,089.00 0.00 Under Review 2019-10-04 2019-10-21 2019-10-19 2019-11-13 2019-11-28 2019-12-19 2020-06-16 Etudes/Suivi et Contrôle dans Selection le cadre de l'execution des sous projets de la composante 3 CS-REF-36 / Recrutement d'un Consultant dans la Consultant région de Toudenit pour IDA / D1680 Community Rehabilitation Post Qualification Open - National 18,119.00 27,838.27 Signed 2019-10-04 2019-10-21 2019-10-19 2020-11-18 2019-11-13 2020-02-10 2019-11-28 2020-03-16 2019-12-19 2020-05-18 2020-06-16 Etudes/Suivi et Contrôle dans Selection le cadre de l'execution des sous projets de la composante 3 CS-REF-4 / P.E pour l'Encadrement, l'Appui conseil, l'Orientation et dispense de Reinsertion Support to Quality And Cost- IDA / D1680 Prior Open - International 1,000,000.00 0.00 Canceled 2018-02-06 2018-10-01 2018-02-11 2018-03-12 2018-04-21 2018-04-28 2018-05-15 2018-06-19 2019-06-19 Kit de formation aux ex- Demobilized Ex-combatants Based Selection combattants démobilisés dans la région de Tombouctou CS-REF-6 / P.E pour l'Encadrement, l'Appui conseil, l'Orientation et dispense de Reinsertion Support to Quality And Cost- IDA / D1680 Prior Open - International 1,000,000.00 0.00 Canceled 2018-02-06 2018-09-17 2018-02-11 2018-03-12 2018-04-21 2018-04-28 2018-05-15 2018-06-19 2019-06-19 Kit de formation aux ex- Demobilized Ex-combatants Based Selection combattants démobilisés dans la région de Menaka CS-REF-50 / P.E N°01 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - International 120,000.00 0.00 Under Review 2019-10-25 2019-02-27 2019-10-26 2019-12-02 2019-12-17 2020-01-21 2021-01-20 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Tombouctou CS-REF-51 / P.E N°01 pour l'Encadrement, l'Appui conseil, Consultant l'Orientation et dispense de Reinsertion Support to IDA / D1680 Post Qualification Open - International 120,000.00 0.00 Under Review 2019-10-25 2019-02-27 2019-11-09 2019-12-09 2019-12-24 2020-01-28 2021-01-27 Kit de formation aux ex- Demobilized Ex-combatants Selection combattants démobilisés dans la région de Menaka CS-REF-56 / Recrutement d’un Consultant pour l’étude Project Management Support Consultant Under situation de référence pour IDA / D1680 to Project Implementation Post Qualification Open - National 17,241.00 0.00 2020-03-16 2020-04-17 2020-03-31 2020-05-10 2020-05-25 2020-06-14 2020-08-13 Implementation l’évaluation des Unit Selection effets/impacts du PREC INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-REF-1 / Recrutement d'un consultant pour l'étude récapitulative socio- économique sur les filières Project Management Support Individual Pending porteuses et les Kits de IDA / D1680 to Project Implementation Post Consultant Open 24,155.00 0.00 2018-02-15 2018-03-23 2018-03-30 2018-04-27 2018-05-27 Implementation Réinsertion dans toutes les Unit Selection régions sur la base d’anciennes études réalisées au Mali CS-REF-13 / Consultant pour Project Management Support Individual Pending l'élaboration de la stratégie de IDA / D1680 to Project Implementation Post Consultant Open 22,544.00 0.00 2018-02-26 2018-04-03 2018-04-10 2018-05-08 2018-06-07 Implementation communication Unit Selection CS-REF-19 / Contrat Project Management Support Individual Pending recrutement de Secrétaire IDA / D1680 to Project Implementation Post Consultant Open 16,000.00 0.00 2019-01-06 2019-02-11 2019-02-16 2019-02-24 2021-03-15 Implementation Administratif Financier (SAF) Unit Selection CS-REF-26 / Recrutement Project Management Support Pending d'un Consultant pour l'Etude IDA / D1680 to Project Implementation Post Direct Selection Direct 20,000.00 0.00 2019-01-08 2019-01-18 2019-02-03 2019-03-05 Implementation du CGES du PREC Unit CS-REF-27 / Recrutement Project Management Support Pending d'un Consultant pour l'Etude IDA / D1680 to Project Implementation Post Direct Selection Direct 20,000.00 0.00 2019-01-08 2019-01-18 2019-02-03 2019-03-05 Implementation du CPRP du PREC Unit CS-REF-28 / Consultant pour l'élaboration du manuel Project Management Support Pending technique de la composante 2 IDA / D1680 to Project Implementation Post Direct Selection Direct 10,000.00 0.00 2019-04-30 2019-05-05 2019-05-20 2019-06-09 Implementation des projets à la demande du Unit PREC CS-REF-43 / Recrutement Project Management Support Individual Pending Spécialiste en Développement IDA / D1680 to Project Implementation Post Consultant Open 32,148.00 0.00 2019-08-07 2019-09-16 2019-10-07 2019-11-07 2021-10-31 Implementation Social (SDS) de l'UEP du PREC Unit Selection Page 10 CS-REF-44 / Recrutement Project Management Support Individual Spécialiste en Sauvegarde Pending IDA / D1680 to Project Implementation Post Consultant Open 32,148.00 0.00 2019-08-07 2019-09-16 2019-10-07 2019-11-07 2021-10-31 Environnemental (SSEv) de Implementation Unit Selection l'UEP du PREC Project Management Support Individual CS-REF-12 / Contrat du Pending IDA / D1680 to Project Implementation Post Consultant Open 32,148.00 0.00 2018-04-16 2018-05-17 2018-05-24 2018-06-03 2019-06-03 spécialiste en suivi évaluation Implementation Unit Selection CS-REF-52 / Recrutement Project Management Support Individual d’un consultant national pour Pending IDA / D1680 to Project Implementation Post Consultant Limited 5,172.00 0.00 2019-11-06 2019-11-11 2019-11-26 2019-12-25 2020-02-23 appui à la passation des Implementation Unit Selection marchés à L’UEP/PREC CS-REF-53 / Recrutement Project Management Support Individual Specialiste en Passation de Under IDA / D1680 to Project Implementation Post Consultant Limited 41,400.00 0.00 2019-12-23 2020-01-14 2019-12-28 2020-01-04 2020-01-15 2021-01-14 marches pour le compte de Implementation Unit Selection l’UEP du PREC CS-REF-54 / Recrutement Project Management Support Individual Specialiste en Gestion Under IDA / D1680 to Project Implementation Post Consultant Limited 41,400.00 0.00 2019-12-23 2020-01-14 2019-12-28 2020-01-04 2020-01-15 2021-01-14 Financiere pour le compte de Implementation Unit Selection l’UEP du PREC CS-REF-55 / Recrutement Individual Ingénieur en Infrastructures Under IDA / D1680 Community Rehabilitation Post Consultant Limited 20,700.00 0.00 2019-12-23 2020-01-14 2019-12-28 2020-01-04 2020-01-15 2020-07-13 communautaires pour le Implementation Selection compte de l’UEP du PREC CS-REF-39 / Recrutement Individual assistant en suivi et IDA / D1680 Community Rehabilitation Post Consultant Open 23,077.00 1,176.62 Signed 2020-04-01 2020-04-17 2020-04-28 2020-07-15 2020-05-13 2020-09-07 2020-06-10 2020-11-16 2021-06-10 évaluation dans la région Selection Tombouctou CS-REF-57 / Recrutement Individual d’un Spécialiste en Violences Pending IDA / D1680 Community Rehabilitation Post Consultant Open 41,400.00 0.00 2020-02-28 2020-04-02 2020-04-09 2020-04-21 2021-04-21 basées sur le Genre (VBG) Implementation Selection pour le PREC CS-REF-42 / Recrutement Individual assistant en suivi et IDA / D1680 Community Rehabilitation Post Consultant Open 23,077.00 1,176.62 Signed 2019-10-27 2020-04-17 2019-11-23 2020-07-15 2019-12-08 2020-09-07 2020-01-05 2020-11-16 2021-01-04 évaluation dans la région Selection Taoudenit CS-REF-37 / Recrutement Individual assistant en suivi et IDA / D1680 Community Rehabilitation Post Consultant Open 23,077.00 1,176.62 Signed 2019-10-27 2020-04-17 2019-11-23 2020-07-16 2019-12-08 2020-09-07 2020-01-05 2020-11-16 2021-01-04 évaluation dans la région Selection Mopti CS-REF-38 / Recrutement Individual assistant en suivi et IDA / D1680 Community Rehabilitation Post Consultant Open 23,077.00 1,176.62 Signed 2019-10-27 2020-04-17 2019-11-23 2020-07-17 2019-12-08 2020-09-07 2020-01-05 2020-11-16 2021-01-04 évaluation dans la région de Selection Gao CS-REF-40 / Recrutement Individual assistant en suivi et IDA / D1680 Community Rehabilitation Post Consultant Open 23,077.00 1,176.62 Signed 2019-10-27 2020-04-17 2019-11-23 2020-07-15 2019-12-08 2020-09-07 2020-01-05 2020-11-16 2021-01-04 évaluation dans la région Selection Kidal CS-REF-41 / Recrutement Individual assistant en suivi et IDA / D1680 Community Rehabilitation Post Consultant Open 23,077.00 1,176.62 Signed 2020-04-01 2020-04-17 2020-04-28 2020-07-15 2020-05-13 2020-09-07 2020-05-28 2020-11-16 2021-05-28 évaluation dans la région Selection Menaka Page 11 PROCUREMENT PLAN (Textual Part) Project information: Sierra Leone: Financial Inclusion (P166601) Project Implementation agency: Ministry of Finance/Bank of Sierra Leone Date of the Procurement Plan: February 4, 2019 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Public Procurement Act 2016, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable; Works: is not applicable Other Relevant Procurement Information. None PROCUREMENT Sierra Leone : Sierra Leone Financial Inclusion Project PLAN General Information Country: Sierra Leone Bank’s Approval Date of the Original Procurement Plan: 2019-02-08 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166601 GPN Date: Project Name: Sierra Leone Financial Inclusion Project Loan / Credit No: / , IDA / 63670 Ministry of Finance and Economic Development Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-97393-GO-RFB / Ensuring the Viability of the Procure hardware and Single Stage - One IDA / 63670 Payments System through Post Request for Bids Open - National 300,000.00 0.00 Canceled 2019-06-10 2019-06-15 2019-07-27 2019-08-26 2019-09-30 2020-03-28 software equipment required Envelope Increasing Usage for upgrading of cybersecurity SL-MOFED-97090-GO-RFB / Procure hardware and Ensuring the Viability of the Single Stage - One software and services to IDA / 63670 Payments System through Post Request for Bids Open - International 400,000.00 0.00 Canceled 2019-05-27 2019-06-01 2019-07-13 2019-08-12 2019-09-16 2020-03-14 Envelope facilitate govt payment via Increasing Usage electronic methods SL-MOFED-96910-GO-RFB / Ensuring the Viability of the Supply and install POS Single Stage - One IDA / 63670 Payments System through Prior Request for Bids Open - International 450,000.00 0.00 Canceled 2020-07-06 2020-07-11 2020-08-22 2020-09-21 2020-10-26 2021-04-24 terminals and provide Envelope Increasing Usage maintenance/servicing SL-MOFED-97381-GO-RFB / Local firm to provide needed Ensuring the Viability of the hardware/software to Single Stage - One IDA / 63670 Payments System through Post Request for Bids Open - International 850,000.00 0.00 Canceled 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 2021-07-31 facilitate rural connectivity to Envelope Increasing Usage the payments system for rural financial service providers SL-MOFED-96344-GO-RFP / Enhancing Interoperability of Single Stage - One Procurement of the National IDA / 63670 Prior Request for Bids Open - International 5,500,000.00 3,900,000.00 Signed 2019-04-29 2020-02-05 2019-05-04 2020-04-08 2019-06-15 2020-04-30 2019-07-15 2020-09-25 2019-08-19 2021-02-05 2022-02-28 Digital Payments Envelope Switch System of Sierra Leone SL-MOFED-173341-GO-RFQ / Supply of Office Project Implementation Request for Single Stage - One IDA / 63670 Post Limited 44,138.00 37,252.90 Completed 2020-05-15 2020-06-11 2020-06-04 2020-08-05 2020-06-18 2020-08-19 Equipments, furnitures & Support Quotations Envelope Stationery SL-MOFED-201699-GO-RFQ Project Implementation Request for Single Stage - One / Procurement of (one) 4*4 IDA / 63670 Post Limited 60,000.00 57,778.76 Completed 2020-11-10 2020-12-03 2021-01-05 2020-12-22 2021-07-04 2021-03-26 Support Quotations Envelope station wagon for SLFIP PIU. SL-MOFED-232920-GO-RFQ Pending Project Implementation Request for Single Stage - One / Procurement of Light IDA / 63670 Post Limited 6,000.00 0.00 Implementati 2021-06-21 2021-08-16 2022-02-12 Support Quotations Envelope Equipment for Switch unit on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-96373-CS-CQS / Hiring an international firm to Consultant Enhancing Interoperability of conduct system testing for / Post Qualification Open - International 200,000.00 0.00 Canceled 2019-06-10 2019-07-01 2019-08-14 2019-09-13 2019-10-18 2020-04-15 Digital Payments user acceptance and Selection supporting tools and systems SL-MOFED-96383-CS-CQS / Consultant Hire a firm to conduct security Enhancing Interoperability of / Post Qualification Open - National 200,000.00 0.00 Canceled 2019-06-17 2019-07-08 2019-08-21 2019-09-20 2019-10-25 2020-04-22 audit and network penetration Digital Payments Selection tests SL-MOFED-97067-CS-QCBS / Hire a firm to develop national stanfdards for mobile wallets and provide business advisory services to drive Ensuring the Viability of the Quality And Cost- access point innovation / Payments System through Prior Open - International 500,000.00 0.00 Canceled 2019-03-25 2019-04-15 2019-05-29 2019-06-26 2019-07-26 2019-08-30 2019-10-04 2020-10-03 Based Selection including developing a Increasing Usage national standard for mobile wallets and to provide implementation training and technical support SL-MOFED-97390-CS-CQS / Hire a firm to conduct Ensuring the Viability of the Consultant cybersecurity testing and IDA / 63670 Payments System through Post Qualification Open - International 200,000.00 0.00 Canceled 2019-05-27 2019-06-17 2019-07-31 2019-08-30 2019-10-04 2020-04-01 implementation plan for BSL Increasing Usage Selection and training for private banks Page 1 SL-MOFED-97376-CS-CQS / Local firm to conduct needs Ensuring the Viability of the Consultant assessment of identifying IDA / 63670 Payments System through Post Qualification Open - National 100,000.00 0.00 Canceled 2019-04-22 2019-05-13 2019-06-26 2019-07-26 2019-08-30 2020-02-26 opportunities for rural Increasing Usage Selection connectivity of the retail payment system SL-MOFED-97383-CS-CQS / Hire a firm to support implementation of improvements necessary to Ensuring the Viability of the Quality And Cost- connect the payments system IDA / 63670 Payments System through Post Open - International 400,000.00 0.00 Canceled 2020-11-02 2020-11-23 2021-01-06 2021-02-03 2021-03-05 2021-04-09 2021-05-14 2022-05-14 Based Selection for rural financial service Increasing Usage providers, including training on core banking applications and support on data migration SL-MOFED-97379-CS-CQS / Local firm to conduct assessment of opportunities Ensuring the Viability of the Consultant to facilitate the connectivity IDA / 63670 Payments System through Post Qualification Open - National 100,000.00 0.00 Canceled 2019-05-27 2019-06-17 2019-07-31 2019-08-30 2019-10-04 2020-04-01 for Apex Banks and member Increasing Usage Selection community banks and FSAs to the payment system SL-MOFED-161815-CS-CQS Ensuring the Viability of the Consultant / Firm to conduct rural IDA / 63670 Payments System through Post Qualification Open - International 100,000.00 97,500.00 Signed 2020-02-28 2020-02-28 2020-03-20 2020-03-12 2020-05-03 2020-05-22 2020-06-02 2020-06-11 2020-07-07 2020-08-25 2021-01-03 connectivity assessment of Increasing Usage Selection the Retail Payment System SL-MOFED-233045-CS-LCS / Project Implementation Least Cost Pending Hire an audit firm to conduct IDA / 63670 Post Open - National 8,000.00 0.00 2021-07-08 2021-07-29 2021-09-11 2021-10-09 2021-11-08 2021-12-13 2022-01-17 2022-07-16 Support Selection Implementation Financial Audit SL-MOFED-233425-CS-QCBS / Hire an International firm to Enhancing Interoperability of Quality And Cost- Pending conduct system testing for IDA / 63670 Post Open - International 200,000.00 0.00 2021-06-09 2021-06-30 2021-08-13 2021-09-10 2021-10-10 2021-11-14 2021-12-19 2022-12-19 Digital Payments Based Selection Implementation user acceptance and supporting tools and systems SL-MOFED-233427-CS-QCBS / Hire a firm to conduct Ensuring the Viability of the Quality And Cost- Under Cybersecurity assessment, IDA / 63670 Payments System through Post Open - International 200,000.00 0.00 2021-05-10 2021-05-11 2021-05-31 2021-05-21 2021-07-14 2021-08-11 2021-09-10 2021-10-15 2021-11-19 2022-11-19 Based Selection Implementation testing, implementation plan, Increasing Usage and capacity building for BSL. SL-MOFED-234182-CS-CQS Ensuring the Viability of the Consultant Under / Hire a firm to Develop a IDA / 63670 Payments System through Post Qualification Open - International 70,000.00 0.00 2021-05-14 2021-05-19 2021-06-04 2021-05-21 2021-07-18 2021-08-17 2021-09-21 2022-03-20 Implementation USSD Regulatory Policy Work Increasing Usage Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-96357-CS-INDV / Hiring a consultant to support Individual sustainable business model Enhancing Interoperability of / Post Consultant Open 100,000.00 0.00 Canceled 2019-04-22 2019-06-10 2019-07-01 2019-08-05 2020-02-01 for the national switch and Digital Payments Selection develop national switch operating procedures SL-MOFED-96368-CS-INDV / Individual Hire a consultant to support Enhancing Interoperability of / Post Consultant Open 150,000.00 0.00 Canceled 2019-04-22 2019-06-10 2019-07-01 2019-08-05 2020-02-01 implementation of the Digital Payments Selection national switch SL-MOFED-97397-CS-INDV / Hire an international Ensuring the Viability of the Individual consultant to support the Pending IDA / 63670 Payments System through Post Consultant Open 100,000.00 0.00 2019-04-22 2019-06-10 2019-07-01 2019-08-05 2020-02-01 development and Implementation Increasing Usage Selection implementation of financial awareness efforts SL-MOFED-97396-CS-INDV / Hire an international Ensuring the Viability of the Individual consultant to conduct legal IDA / 63670 Payments System through Post Consultant Limited 85,000.00 0.00 Canceled 2019-04-15 2019-04-20 2019-05-11 2019-06-15 2019-12-12 review of the payments Increasing Usage Selection legislation and to update the regulatory framework SL-MOFED-97401-CS-INDV / Individual Hire a consultant to develop Project Implementation Under IDA / 63670 Post Consultant Limited 20,000.00 0.00 2019-02-18 2019-02-21 2019-02-23 2019-02-21 2019-03-16 2019-04-03 2019-04-20 2019-10-17 the Project Implementation Support Implementation Selection Manual SL-MOFED-98272-CS-INDV / Hire a local consultant to facilitate implementation of Individual Project Implementation component 2b (rural IDA / 63670 Post Consultant Open 200,000.00 0.00 Canceled 2019-03-11 2019-04-29 2019-05-20 2019-06-24 2019-12-21 Support connectivity) of the project Selection and work with Apex Bank and the private sector committee SL-MOFED-96347-CS-INDV / Hire an international Individual Enhancing Interoperability of consultant to support the IDA / 63670 Post Consultant Open 75,000.00 0.00 Canceled 2019-02-22 2019-03-19 2019-04-12 2019-05-03 2019-06-07 2019-12-04 Digital Payments procurement of the national Selection switch SL-MOFED-97405-CS-INDV / Hire an international Individual consultant to support the Project Implementation IDA / 63670 Post Consultant Open 100,000.00 0.00 Canceled 2019-05-27 2019-07-15 2019-08-05 2019-09-09 2020-03-07 private sector committee Support Selection including its design and capacity building SL-MOFED-102104-CS-INDV Individual / Hire a consultant to support Enhancing Interoperability of IDA / 63670 Post Consultant Open 75,000.00 0.00 Canceled 2019-02-22 2019-03-19 2019-04-12 2019-05-03 2019-06-07 2019-12-04 the procurement of the Digital Payments Selection national switch Page 2 SL-MOFED-96363-CS-INDV / Individual Enhancing Interoperability of Hire a Switch Technical IDA / 63670 Prior Consultant Open 200,000.00 0.00 Canceled 2019-03-04 2019-04-22 2019-05-13 2019-06-17 2020-06-17 Digital Payments Advisor Selection SL-MOFED-97531-CS-INDV / Recruitment of a local consultant (Project Individual Coordinator) to facilitate Project Implementation IDA / 63670 Prior Consultant Open 300,000.00 0.00 Canceled 2019-02-14 2019-02-20 2019-04-04 2019-04-25 2019-05-30 2022-12-30 implementation pf the Support Selection project(SLFIP) for component 1 and the private sector committee SL-MOFED-103855-CS-INDV Individual Project Implementation / Recruitment of a Project IDA / 63670 Post Consultant Open 100,000.00 0.00 Canceled 2019-03-04 2019-03-04 2019-04-22 2019-05-13 2019-06-17 2020-06-17 Support Coordinator Selection SL-MOFED-104783-CS-INDV / Hire a local consultant to facilitate implementation of Ensuring the Viability of the Individual component 2b (rural IDA / 63670 Payments System through Post Consultant Open 100,000.00 0.00 Canceled 2019-03-11 2019-03-07 2019-04-29 2019-05-20 2019-06-24 2020-06-24 connectivity) of the project Increasing Usage Selection and work with Apex Bank and the Private Sector Committees SL-MOFED-97395-CS-INDV / Hire an international Ensuring the Viability of the Individual consultant to develop the IDA / 63670 Payments System through Post Consultant Limited 15,000.00 0.00 Canceled 2019-03-20 2019-03-25 2019-04-15 2019-05-15 2019-11-11 USSD (Unstructued Increasing Usage Selection Supplementary Service Data) regulations SL-MOFED-141688-CS-CDS / Hire a consultant to support Project Implementation IDA / 63670 Post Direct Selection Direct 80,000.00 100,588.66 Signed 2019-10-21 2019-10-21 2019-10-22 2019-10-23 2019-11-04 2019-11-13 2020-11-03 the procurement of the Support national switch SL-MOFED-141700-CS-CDS / Hire an international consultant to conduct legal Enhancing Interoperability of IDA / 63670 Post Direct Selection Direct 85,000.00 64,000.00 Signed 2019-10-22 2019-10-21 2019-11-01 2019-10-23 2019-12-14 2019-11-14 2021-07-14 review of the payments Digital Payments legislation and to update the regulatory framework SL-MOFED-142565-CS-INDV Individual / Recruitment of Local Project Implementation IDA / 63670 Post Consultant Open 75,000.00 72,000.00 Signed 2019-10-25 2019-10-25 2019-11-28 2020-02-25 2019-11-30 2020-03-23 2019-12-14 2020-05-07 2020-12-13 Consultant as a Project Support Selection Coordinator SL-MOFED-154612-CS-INDV Individual Enhancing Interoperability of / Payment Switch IDA / 63670 Post Consultant Open 175,000.00 174,302.04 Signed 2020-01-24 2020-01-21 2020-02-26 2020-03-13 2020-03-02 2020-04-09 2020-03-23 2020-08-04 2021-03-23 Digital Payments Implementation Manager Selection SL-MOFED-166452-CS-INDV / Hire a Payment Systems Ensuring the Viability of the Individual consultant (PSC) to help IDA / 63670 Payments System through Post Consultant Open 75,000.00 123,000.00 Signed 2020-03-27 2020-03-29 2020-05-15 2020-07-29 2020-06-05 2020-11-02 2020-07-10 2020-11-06 2021-01-06 operationalize the Sierra Increasing Usage Selection Leone National switch. SL-MOFED-186420-CS-INDV / A MAPPING OF Ensuring the Viability of the Individual GOVERNMENT PAYMENTS IDA / 63670 Payments System through Post Consultant Open 30,000.00 29,000.00 Signed 2020-07-31 2020-08-07 2020-09-18 2020-10-01 2020-10-09 2020-10-19 2020-11-13 2020-12-14 2021-05-12 FOR THE FINANCIAL Increasing Usage Selection INCLUSION PROJECT SL-MOFED-201696-CS-INDV Ensuring the Viability of the Individual / Hire a consultant to conduct IDA / 63670 Payments System through Post Consultant Open 30,000.00 0.00 Canceled 2020-10-28 2020-10-30 2020-11-24 2020-12-04 2020-12-18 2021-03-18 an assessment of the digital Increasing Usage Selection payment access point. SL-MOFED-164068-CS-INDV Ensuring the Viability of the Individual / Develop the USSD Policy and IDA / 63670 Payments System through Post Consultant Limited 25,000.00 0.00 Canceled 2020-03-13 2020-03-13 2020-03-20 2020-04-24 2020-10-21 Regulatory Work Increasing Usage Selection SL-MOFED-225242-CS-INDV Ensuring the Viability of the Individual / Develop the USSD policy and IDA / 63670 Payments System through Post Consultant Open 36,000.00 0.00 Canceled 2021-03-12 2021-03-24 2021-04-30 2021-05-21 2021-06-25 2021-12-22 Regulatory Work Increasing Usage Selection SL-MOFED-233046-CS-INDV / Hire the services of a Individual communications consultant to Enhancing Interoperability of Pending IDA / 63670 Post Consultant Open 20,000.00 0.00 2021-08-19 2021-10-07 2021-10-28 2021-12-02 2022-05-31 develop a concise Digital Payments Implementation Selection communication plan for switch roll out SL-MOFED-233047-CS-INDV Individual / Hire Technical Adviser to Project Implementation Pending IDA / 63670 Post Consultant Open 50,000.00 0.00 2021-06-30 2021-08-18 2021-09-08 2021-10-13 2022-04-11 support activities from Rural Support Implementation Selection Connectivity Page 3 WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months) I. General The following procurement plan has been developed for project implementation during the first eighteen months and provides the basis for the procurement methods and bank prior/post review thresholds. It covers the three categories, namely, Works; Consultancies; and Goods. The plan will be updated when need arises to reflect the actual project implementation needs. 1. Project information: Country / Borrower: Republic of Kenya Project: Water and Sanitation Development Project (WSDP) IDA Credit No. 6029 & 6030 Project Implementing Agencies: (a) Ministry of Water and Irrigation, (b) WaSREB, (c) Water Service Providers: Kilifi-Mariakani Water and Sewerage Company (Kimawasco),; Taita-Voi Water and Sewerage Company (Tavevo); Mombasa Water Supply and Sanitation Company (Mowassco); Kwale Water and Sewerage Company (Kwawasco); Garissa Water and Sewerage Company (Gawasco); Wajir Water and Sewerage Company (Wajwasco); and Malindi Water and Sewerage Company; and (d) Counties: Kilifi; Taita Taveta; Mombasa; Kwale; Garissa; and Wajir 2. Bank’s approval Date of the First Eighteen Months’ Procurement Plan: June 15, 2017 3. Date of General Procurement Notice: June 14, 2017 4. Period covered by this procurement plan: June 2017 to December 2018 II: Works, Goods and Consultancy Services: Thresholds for Procurement Methods and Bank’s Prior Review The Table below provides the details of Thresholds for Procurement Methods and Bank’s Prior Review for Works, Goods and Consultancy Services Page 1 of 2 Contract Value (Threshold) Procurement Expenditure Contract Subject to Category (US$ 000) Method Prior Review 1. Works 15,000 or more ICB Contracts above $5 million Below 15,000 NCB First contract per entity and Contracts above $5 million Below or equal Shopping None unless contract 200 specified in the PP No threshold Direct As specified in PP Contracting 2. Goods 1,000 or more ICB First contract per entity and Contracts above $1.5 million Below 1,000 NCB First contract per entity Below or equal Shopping None unless contract to 100 specified in the PP No threshold Direct As specified in PP Contracting 3. Consultancy Firms* QCBS,LCS,FBS, First contract per Services QBS entity and Contracts above $0.5 million Firms* CQS First contract per (Estimated cost entity less than $300,000) Individual IC (at least 3 All contract of CVs) estimated cost above $200,000 and more No threshold Single Source All *Assignments whose estimated cost is less $300,000 could be Open-National (Shortlist could comprise of all national firms) NB: All terms of reference for consulting services will be subject to IDA’s prior review. Page 2 of 2 PROCUREMENT Kenya : Water and Sanitation Development Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2019-10-08 2021-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156634 GPN Date: 2017-06-13 Project Name: Water and Sanitation Development Project Loan / Credit No: IDA / 60300, IDA / 60290 W Executing Agency(ies): ater Sector Trust Fund WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-WSTF-234306-GO-RFB / Component 3: National Purchase of Three Units Under performance-based financing Single Stage - One Special Duty, Utility Passenger IDA / 60300 Post Request for Bids Open - National 240,000.00 0.00 Implementati 2021-05-21 2021-05-31 2021-05-26 2021-06-25 2021-07-09 2021-08-06 2021-11-04 (PBF) (US$40.7 of which IDA- Envelope Caravan Vehicle, 4x4, L.W.B, on SUF US$37 million). 2900-4200cc, Diesel NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE- WASREB-134249-CS- QCBS / Consultancy Services for Initial Assessment of Component 3: National Suitability and Design of performance-based financing Quality And Cost- Under Performance Based Contracts IDA / 60300 Post Open - International 496,800.00 487,400.00 2019-09-25 2019-10-08 2019-10-16 2020-02-17 2019-11-29 2021-03-10 2019-12-27 2021-03-26 2020-01-26 2021-04-12 2020-03-01 2021-05-18 2020-04-05 2021-08-03 (PBF) (US$40.7 of which IDA- Based Selection Implementation (PBCs) for Non Revenue Water SUF US$37 million). (NRW) Reduction for a Cluster of Six (6) Water Service Providers (WSPs) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: National KE-WSTF-207294-CS-INDV / Individual performance-based financing Consultancy Services for IDA / 60300 Post Consultant Limited 150,000.00 90,487.22 Signed 2020-12-06 2021-03-17 2020-12-27 2021-05-12 2021-01-03 2021-05-31 2021-01-24 2021-06-07 2022-10-31 (PBF) (US$40.7 of which IDA- Financial expert. Selection SUF US$37 million). KE-WSTF-207303-CS-INDV / Component 3: National Consultancy Services for Individual performance-based financing Environmental and Social IDA / 60300 Post Consultant Limited 150,000.00 90,487.22 Signed 2020-12-06 2021-03-31 2020-12-27 2021-05-12 2021-01-03 2021-05-31 2021-01-24 2021-06-07 2022-10-31 (PBF) (US$40.7 of which IDA- Impact Assessment (ESIA) Selection SUF US$37 million). expert. KE-WSTF-207239-CS-CDS / Component 3: National Individual Consultancy performance-based financing Services - Program Manager IDA / 60290 Post Direct Selection Direct 212,250.00 191,182.29 Signed 2020-11-30 2021-04-15 2020-12-10 2021-05-31 2020-12-19 2021-01-01 2022-10-31 (PBF) (US$40.7 of which IDA- for implementation of the SUF US$37 million). NPBF program. Page 1 PROCUREMENT PLAN (Textual Part) Project information: [Nigeria] [Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project] [P-166239] Project Implementation Agency: [Federal Ministry of Education] Date of the Procurement Plan: [2109/10/24] Period covered by this Procurement Plan: [October 24, 2019 – April 23, 2020] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017, August 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. - “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables - “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable. Goods: Not Applicable Works: Not Applicable Consultancy: Not Applicable Hands-on Expanded Implementation Support (HEIS): Not Applicable PROCUREMENT Nigeria : Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2021-05-20 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166239 GPN Date: Project Name: Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project Loan / Credit No: IDA / 65140 Benue IDEAS Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Incentivizing partnerships NG-BENUE IDEAS-231697- with industry for enhanced Pending Request for Single Stage - One GO-RFQ / Vehicle: 1 no. 2.7 IDA / 65140 quality and labour-market Post Limited 65,000.00 0.00 Implementati 2021-05-15 2021-07-10 2022-01-06 Quotations Envelope Hilux van orientation of public on Technical Colleges Incentivizing partnerships with industry for enhanced Pending NG-BENUE IDEAS-231821- Request for Single Stage - One IDA / 65140 quality and labour-market Post Limited 7,500.00 0.00 Implementati 2021-05-21 2021-07-16 2022-01-12 GO-RFQ / Office Furniture Quotations Envelope orientation of public on Technical Colleges Incentivizing partnerships with industry for enhanced Pending NG-BENUE IDEAS-231851- Request for Single Stage - One IDA / 65140 quality and labour-market Post Limited 25,625.00 0.00 Implementati 2021-06-04 2021-07-30 2022-01-26 GO-RFQ / Office equipment Quotations Envelope orientation of public on Technical Colleges Incentivizing partnerships NG-BENUE IDEAS-231877- with industry for enhanced Pending Request for Single Stage - One GO-RFQ / upgrades of IDA / 65140 quality and labour-market Post Limited 1,875.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 Quotations Envelope facilities orientation of public on Technical Colleges NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Incentivizing partnerships NG-BENUE IDEAS-231888-CS- with industry for enhanced Individual INDV / Consultancy support Pending IDA / 65140 quality and labour-market Post Consultant Limited 16,500.00 0.00 2021-05-31 2021-06-05 2021-06-26 2021-07-31 2021-09-29 needed to design Implementation orientation of public Selection communication strategy Technical Colleges NG-BENUE IDEAS-231890-CS- INDV / Consultancy to Incentivizing partnerships maintain curriculum relevance with industry for enhanced Individual Pending and providing targeted IDA / 65140 quality and labour-market Post Consultant Limited 16,000.00 0.00 2021-06-07 2021-06-12 2021-07-03 2021-08-07 2021-09-06 Implementation benefits to graduate in order orientation of public Selection to enhance the marketability Technical Colleges of IDEAS Project NG-BENUE IDEAS-237568-CS- INDV / Consultancy for Development of modern Individual Improving skills formation in Pending technology in the acquisition IDA / 65140 Post Consultant Limited 18,000.00 0.00 2021-06-13 2021-06-18 2021-07-09 2021-08-13 2021-09-12 the informal sector Implementation of skills for development is Selection necessary if the IDEAS project will achieve its PDO. Page 1 PROCUREMENT PLAN (Textual Part) Project information: [Nigeria] [Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project] [P-166239] Project Implementation Agency: [Federal Ministry of Education] Date of the Procurement Plan: [2109/10/24] Period covered by this Procurement Plan: [October 24, 2019 – April 23, 2020] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017, August 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. - “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables - “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable. Goods: Not Applicable Works: Not Applicable Consultancy: Not Applicable Hands-on Expanded Implementation Support (HEIS): Not Applicable PROCUREMENT Nigeria : Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2021-05-21 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166239 GPN Date: Project Name: Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project Loan / Credit No: IDA / 65140 National Board for Technical Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Strengthening the regulatory PMU/IDEAS/CW/02/21 / environment and public Request for Pending Upgrade Facilities and Request for Single Stage - One 2022-02- IDA / 65140 management capacities for Post Limited Quotations (Non 200,000.00 0.00 Implementat 2021-07-03 2021-08-28 Systems in Skills Development Quotations Envelope 24 market-oriented skills Bank-SPD) ion Agencies development Strengthening the regulatory PMU/IDEAS/CW/01/21 / environment and public Request for Pending Request for Single Stage - One 2022-02- Renovation/Rehabilitation of IDA / 65140 management capacities for Post Limited Quotations (Non 200,000.00 0.00 Implementat 2021-07-03 2021-08-28 Quotations Envelope 24 Project Office in Kaduna market-oriented skills Bank-SPD) ion development GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PMU/IDEAS/GO/05/21 / Strengthening the regulatory Procurement of Project environment and public Pending Request for Single Stage - One Vehicles for Project Office in IDA / 65140 management capacities for Post Limited 127,000.00 0.00 Implementati 2021-07-19 2021-09-13 2022-03-12 Quotations Envelope Kaduna (Multiple Contracts) - market-oriented skills on 2 Lots development Strengthening the regulatory PMU/IDEAS/GO/03/21 / environment and public Pending Establishment of Management Single Stage - One IDA / 65140 management capacities for Post Request for Bids Limited 300,000.00 0.00 Implementati 2021-07-12 2021-07-17 2021-08-28 2021-09-27 2021-11-01 2022-04-30 Information (MIS) for Kaduna Envelope market-oriented skills on Office development Strengthening the regulatory PMU/IDEAS/GO/04/21 / environment and public Pending Procurement of Office Single Stage - One IDA / 65140 management capacities for Post Request for Bids Limited 200,000.00 0.00 Implementati 2021-07-27 2021-08-01 2021-09-12 2021-10-12 2021-11-16 2022-05-15 Furniture and ICT Equipment Envelope market-oriented skills on for Project Office in Kaduna development PMU/IDEAS/GO/01/21 / Strengthening the regulatory Procurement of Database environment and public Pending Single Stage - One Hardware for the National IDA / 65140 management capacities for Post Request for Bids Open - National 200,000.00 0.00 Implementati 2021-06-30 2021-09-15 2021-09-15 2021-07-05 2021-11-24 2021-12-24 2022-01-28 2023-07-22 Envelope Skills Qualification Framework market-oriented skills on (NSQF) Roll-out development NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening the regulatory PMU/IDEAS/GO/02/21 / environment and public Pending Production of Materials for Request for Single Stage - One IDA / 65140 management capacities for Post Limited 100,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 National Skills Qualification Quotations Envelope market-oriented skills on Framework (NSQF) development CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Incentivizing partnerships PMU/IDEAS/CS/01/21 / with industry for enhanced Consultant Prepare and conduct Pending IDA / 65140 quality and labour-market Post Qualification Limited 150,000.00 0.00 2021-06-08 2021-06-22 2021-07-22 2021-08-26 2022-02-22 foundational skills Implementation orientation of public Selection assessment and follow-up Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/02/21 / with industry for enhanced Consultant Pending Support for IDP Development IDA / 65140 quality and labour-market Post Qualification Limited 252,000.00 0.00 2021-06-15 2021-06-29 2021-07-29 2021-09-02 2022-03-01 Implementation STCs orientation of public Selection Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/03/21 / with industry for enhanced Consultant Pending Review and Development of IDA / 65140 quality and labour-market Post Qualification Limited 125,000.00 0.00 2021-06-22 2021-07-06 2021-08-05 2021-09-09 2022-03-08 Implementation Curricula for TCs orientation of public Selection Technical Colleges PMU/IDEAS/CS/14/21 / Consultant Digital /ICT Consultant to Improving skills formation in Pending IDA / 65140 Post Qualification Limited 200,000.00 0.00 2021-07-19 2021-08-02 2021-09-01 2021-10-06 2022-04-04 support the integration of ICT the informal sector Implementation Selection in Apprenticeship PMU/IDEAS/CS/16/21 / TA to facilitate implementation of Consultant Improving skills formation in Pending apprenticeship system & IDA / 65140 Post Qualification Limited 300,000.00 0.00 2021-06-25 2021-07-09 2021-08-08 2021-09-12 2022-03-11 the informal sector Implementation provide support to Selection apprentices Page 1 PMU/IDEAS/CS/17/21 / Consultant Develop training plans, Improving skills formation in Pending IDA / 65140 Post Qualification Limited 280,000.00 0.00 2021-06-28 2021-07-12 2021-08-11 2021-09-15 2022-03-14 manuals, curricula and the informal sector Implementation Selection assessment instruments Strengthening the regulatory PMU/IDEAS/CS/26/21 / environment and public Consultant Pending Baseline Study for Informal IDA / 65140 management capacities for Post Qualification Open - National 200,000.00 0.00 2021-08-17 2021-09-07 2021-10-21 2021-11-20 2021-12-25 2022-06-23 Implementation Sector market-oriented skills Selection development PMU/IDEAS/CS/27/21 / Strengthening the regulatory Development of Software for environment and public Consultant Pending the National Skills IDA / 65140 management capacities for Post Qualification Limited 300,000.00 0.00 2021-06-30 2021-07-14 2021-08-13 2021-09-17 2022-03-16 Implementation Qualification Framework market-oriented skills Selection (NSQF) Roll-out development PMU/IDEAS/CS/30/21 / Strengthening the regulatory Support to the Development environment and public Consultant of Sector Skills Councils (SSCs) Pending IDA / 65140 management capacities for Post Qualification Limited 250,000.00 0.00 2021-08-23 2021-09-06 2021-10-06 2021-11-10 2022-05-09 and National Council on Skills Implementation market-oriented skills Selection (NCS) - Coordinating development Consultant PMU/IDEAS/CS/39/21 / Strengthening the regulatory Engagement of External environment and public Consultant Pending Consultants for Monitoring IDA / 65140 management capacities for Post Qualification Limited 250,000.00 0.00 2021-08-30 2021-09-13 2021-10-13 2021-11-17 2022-05-16 Implementation and Evaluation of Project market-oriented skills Selection activities development Incentivizing partnerships PMU/IDEAS/CS/04/21 / with industry for enhanced Consultant Review and Development of Pending IDA / 65140 quality and labour-market Post Qualification Limited 125,000.00 0.00 2021-06-20 2021-07-04 2021-08-03 2021-09-07 2022-03-06 Curricula for TCs on Building Implementation orientation of public Selection and Carpentry trades Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/06/21 / with industry for enhanced Consultant Review and Development of Pending IDA / 65140 quality and labour-market Post Qualification Limited 125,000.00 0.00 2021-07-19 2021-08-02 2021-09-01 2021-10-06 2022-04-04 Curricula for TCs on Electrical Implementation orientation of public Selection and Electronics Technology Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/05/21 / with industry for enhanced Consultant Review and Development of Pending IDA / 65140 quality and labour-market Post Qualification 125,000.00 0.00 2021-07-12 2021-07-26 2021-08-25 2021-09-29 2022-03-28 Curricula for TCs on Auto Implementation orientation of public Selection Mechanics Technical Colleges PMU/IDEAS/CS/28/21 / Institutionalisation of National Strengthening the regulatory Skills Qualification Framework environment and public Consultant NSQF- Technical Assistants to Pending IDA / 65140 management capacities for Post Qualification Limited 300,000.00 0.00 2021-08-09 2021-08-23 2021-09-22 2021-10-27 2022-04-25 support NBTE in the Implementation market-oriented skills Selection Institutionalisation of of NSQF development and Recognition of Prior Learning System (RPL) PMU/IDEAS/CS/33/21 / Strengthening the regulatory Review/Development of environment and public Consultant Existing/New National Pending IDA / 65140 management capacities for Post Qualification Limited 300,000.00 0.00 2021-07-05 2021-07-19 2021-08-18 2021-09-22 2022-03-21 Occupational Standards (NOS) Implementation market-oriented skills Selection for at least 10 NOS (In development different Sectors)- Phase 1 PMU/IDEAS/CS/31/21 / Support to the Development Consultant of Sector Skills Councils (SSCs)- Improving skills formation in Pending IDA / 65140 Post Qualification Limited 250,000.00 0.00 2021-08-23 2021-09-06 2021-10-06 2021-11-10 2022-05-09 To support the Development the informal sector Implementation Selection of Sector Skills Council in Nigeria Strengthening the regulatory PMU/IDEAS/CS/34/21 / environment and public Consultant Content Development for Pending IDA / 65140 management capacities for Post Qualification Limited 200,000.00 0.00 2021-09-06 2021-09-20 2021-10-20 2021-11-24 2022-05-23 Skills Training (and internal Implementation market-oriented skills Selection capacity) - Phase 1 development PMU/IDEAS/CS/32/21 / Strengthening the regulatory Support to the National environment and public Consultant Pending Council on Skills (NCS)- IDA / 65140 management capacities for Post Qualification Limited 250,000.00 0.00 2021-08-23 2021-09-06 2021-10-06 2021-11-10 2022-05-09 Implementation National Council on Skills in market-oriented skills Selection Nigeria development Strengthening the regulatory PMU/IDEAS/CS/35/21 / environment and public Consultant Pending Development of Recognition IDA / 65140 management capacities for Post Qualification Limited 300,000.00 0.00 2021-08-31 2021-09-14 2021-10-14 2021-11-18 2022-05-17 Implementation of Prior Learning (RPL) System market-oriented skills Selection development INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PMU/IDEAS/CS/07/21 / Conduct skills gap (technical, Individual Improving skills formation in Pending digital and foundational) IDA / 65140 Post Consultant Limited 50,000.00 0.00 2021-07-26 2021-07-31 2021-08-21 2021-09-25 2022-03-24 the informal sector Implementation analysis for Apprentices Selection (Coordinating Consultant) PMU/IDEAS/CS/08/21 / Conduct skills gap (technical, Individual Improving skills formation in Pending digital and foundational) IDA / 65140 Post Consultant Limited 50,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 the informal sector Implementation analysis for Apprentices - Selection Kano State PMU/IDEAS/CS/09/21 / Conduct skills gap (technical, Individual Improving skills formation in Pending digital and foundational) IDA / 65140 Post Consultant Limited 50,000.00 0.00 2021-07-30 2021-08-04 2021-08-25 2021-09-29 2022-03-28 the informal sector Implementation analysis for Apprentices - Selection Gombe State Page 2 PMU/IDEAS/CS/10/21 / Conduct skills gap (technical, Individual Improving skills formation in Pending digital and foundational) IDA / 65140 Post Consultant Limited 50,000.00 0.00 2021-03-08 2021-03-13 2021-04-03 2021-05-08 2021-11-04 the informal sector Implementation analysis for Apprentices - Selection Benue State PMU/IDEAS/CS/11/21 / Conduct skills gap (technical, Individual Improving skills formation in Pending digital and foundational) IDA / 65140 Post Consultant Limited 50,000.00 0.00 2021-07-30 2021-08-04 2021-08-25 2021-09-29 2022-03-28 the informal sector Implementation analysis for Apprentices - Selection Ekiti State PMU/IDEAS/CS/12/21 / Conduct skills gap (technical, Individual Improving skills formation in Pending digital and foundational) IDA / 65140 Post Consultant Limited 50,000.00 0.00 2021-03-08 2021-03-13 2021-04-03 2021-05-08 2021-11-04 the informal sector Implementation analysis for Apprentices - Edo Selection State PMU/IDEAS/CS/13/21 / Conduct skills gap (technical, Individual Improving skills formation in Pending digital and foundational) IDA / 65140 Post Consultant Open 50,000.00 0.00 2021-03-08 2021-04-26 2021-05-17 2021-06-21 2021-12-18 the informal sector Implementation analysis for Apprentices - Selection Abia State PMU/IDEAS/CS/15/21 / Technical Assisstant to plan, develop and upgrade Individual Improving skills formation in Pending apprenticeship system in IDA / 65140 Post Consultant Limited 150,000.00 0.00 2021-08-30 2021-09-04 2021-09-25 2021-10-30 2022-04-28 the informal sector Implementation Nigeria (Long Term Selection International Individual Consultant) Incentivizing partnerships PMU/IDEAS/CS/19/21 / with industry for enhanced Individual Engagement of Project Pending IDA / 65140 quality and labour-market Post Consultant Limited 50,000.00 0.00 2021-07-12 2021-07-17 2021-08-07 2021-09-11 2022-03-10 Technical Assistants (TA) - Implementation orientation of public Selection Financial Mgmt Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/20/21 / with industry for enhanced Individual Engagement of Project Pending IDA / 65140 quality and labour-market Post Consultant Limited 50,000.00 0.00 2021-06-28 2021-07-03 2021-07-24 2021-08-28 2022-02-24 Technical Assistants (TA) - M Implementation orientation of public Selection &E Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/21/21 / with industry for enhanced Individual Engagement of Project Pending IDA / 65140 quality and labour-market Post Consultant Limited 50,000.00 0.00 2021-06-14 2021-06-19 2021-07-10 2021-08-14 2022-02-10 Technical Assistants (TA) - Implementation orientation of public Selection ICT Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/23/21 / with industry for enhanced Individual Pending Engagement of Project IDA / 65140 quality and labour-market Post Consultant Limited 50,000.00 0.00 2021-06-14 2021-06-19 2021-07-10 2021-08-14 2022-02-10 Implementation Technical Assistants (TA) - HR orientation of public Selection Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/24/21 / with industry for enhanced Individual Engagement of Project Pending IDA / 65140 quality and labour-market Post Consultant Limited 50,000.00 0.00 2021-06-14 2021-06-19 2021-07-10 2021-08-14 2022-02-10 Technical Assistants (TA) - Implementation orientation of public Selection Technical to PMU Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/25/21 / with industry for enhanced Individual Engagement of Project Pending IDA / 65140 quality and labour-market Post Consultant Limited 50,000.00 0.00 2021-06-21 2021-06-26 2021-07-17 2021-08-21 2022-02-17 Technical Assistants (TA) - Implementation orientation of public Selection Informal Sector Technical Colleges Strengthening the regulatory PMU/IDEAS/CS/38/21 / TA environment and public Individual Pending on Innovation (Innovation IDA / 65140 management capacities for Post Consultant Direct 100,000.00 0.00 2021-08-30 2021-09-09 2021-09-30 2021-11-04 2022-05-03 Implementation Grant Manager) market-oriented skills Selection development Incentivizing partnerships PMU/IDEAS/CS/22/21 / with industry for enhanced Individual Engagement of Project Pending IDA / 65140 quality and labour-market Post Consultant Limited 50,000.00 0.00 2021-06-21 2021-06-26 2021-07-17 2021-08-21 2022-02-17 Technical Assistants (TA) - Implementation orientation of public Selection Safeguard Technical Colleges Incentivizing partnerships PMU/IDEAS/CS/18/21 / with industry for enhanced Individual Engagement of Project Pending IDA / 65140 quality and labour-market Post Consultant Limited 50,000.00 0.00 2021-12-05 2021-12-10 2021-12-31 2022-02-04 2022-08-03 Technical Assistants (TA) - Implementation orientation of public Selection Procurement Technical Colleges Page 3 PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-10-04 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / D2880, IDA / 62150, IDA / D2860 M Executing Agency(ies): inistry of Environment and Sustainable Development WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74186-CW-RFQ / Component 3: Strengthening Mise en place d'une clôture Request for Single Stage - One 2019-07- 2019- IDA / D2880 National Physical and Social Post Limited 36,168.67 Completed 2018-11-10 2019-11-08 2019-01-05 2019-11-13 grillagée autour de la marre à Quotations Envelope 04 11-30 Investments Spartines MR-MEDD-74202-CW-RFQ / Component 3: Strengthening Travaux d'entretien des Request for Single Stage - One 2019-08- IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-12-30 2019-02-24 couloirs de pare-feux du Quotations Envelope 23 Investments Typha au niveau de Diawling MR-MEDD-74205-CW-RFB / Component 4: National Single Stage - Two 2019-08- Construction des sièges de IDA / D2880 Post Request for Bids Open - National 0.00 Canceled 2018-09-03 2018-09-08 2018-10-20 2019-01-02 2019-02-06 Coordination Envelope 05 l'Observatoire et de l'UGP MR-MEDD-75955-CW-RFB / Component 3: Strengthening Single Stage - One 2019-08- Colmatage des brèches du IDA / D2880 National Physical and Social Post Request for Bids Open - National 0.00 Canceled 2018-11-05 2018-11-10 2018-12-22 2019-01-21 2019-02-25 Envelope 24 littoral de NKTT Investments MR-MEDD-75986-CW-RFQ / Component 3: Strengthening Pending Request for Single Stage - One 2019-05- Travaux pour la fixation des IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2018-10-06 2018-12-01 Quotations Envelope 30 dunes au niveau de Chami Investments ion MR-MEDD-76006-CW-RFQ / Component 3: Strengthening Pending Restauration des éco- Request for Single Stage - One 2019-07- IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2018-11-20 2019-01-15 systèmes du Parc National Quotations Envelope 14 Investments ion d'Awleigatt (PNA) MR-MEDD-75980-CW-RFQ / Component 3: Strengthening Pending Travaux de fixation de dunes Request for Single Stage - One 2019-06- IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2018-10-20 2018-12-15 du littoral de NKTT sur un Quotations Envelope 13 Investments ion premier site pilote MR-MEDD-115356-CW-RFQ / Réalisation de clôture Component 3: Strengthening grillagée autour du périmètre Request for Single Stage - One 2019-07- 2019- IDA / D2880 National Physical and Social Post Limited 36,467.31 Completed 2019-05-25 2019-06-13 2019-06-10 2019-06-21 de 15 ha de fixation Quotations Envelope 20 07-22 Investments mécanique et biologique du cordon dunaire de Nouakchott MR-MEDD-115655-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2019-08- 2019- / Fixation de 15 ha de dunes IDA / D2880 National Physical and Social Post Limited 36,984.27 Completed 2019-06-01 2019-06-12 2019-06-11 2019-06-28 Quotations Envelope 10 09-16 du littoral de Nouakchott Investments MR-MEDD-115657-CW-RFQ / Travaux d'entretien de Component 3: Strengthening Under Request for Single Stage - One 2019-07- couloirs de pare-feus pour la IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2019-05-30 2021-05-19 2019-06-12 Quotations Envelope 12 restauration des mangroves Investments ion au niveau de Diawling MR-MEDD-115659-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2019-07- 2019- / Réalisation de pépinières de IDA / D2880 National Physical and Social Post Limited 34,921.07 Completed 2019-06-08 2019-07-19 2019-06-21 2019-08-01 Quotations Envelope 21 08-29 mangroves au Diawling Investments MR-MEDD-124501-CW-RFQ Component 3: Strengthening / mise en place d'une cloture Request for Single Stage - One 2020-04- 2019- IDA / D2880 National Physical and Social Post Limited 8,464.35 Completed 2019-08-26 2019-07-25 2019-10-21 2019-08-02 de protectionsur les 2 ha de Quotations Envelope 18 08-29 Investments dunes fixées au PND MR-MEDD-124500-GO-RFQ Component 3: Strengthening Pending / mise en place de clotures Request for Single Stage - One 2020-04- IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2019-09-07 2019-10-19 pour abriter les pépinières de Quotations Envelope 16 Investments ion mangroves au PND MR-MEDD-129309-CW-RFQ / Clôture grillagée pour la Component 3: Strengthening Request for Single Stage - One 2020-04- 2019- protection d'une fixation de IDA / D2880 National Physical and Social Post Limited 36,983.98 Completed 2019-09-07 2019-09-13 2019-11-02 2019-09-17 Quotations Envelope 30 10-23 dunes de 15 ha du littoral de Investments Nouakchott MR-MEDD-137084-CW-RFQ / Mise en place de couloirs de Component 1: Strengthening Request for Single Stage - One 2019-11- 2020- IDA / D2880 Post Limited 28,650.24 Completed 2019-10-06 2020-03-13 2019-10-16 2020-03-06 pare-feux de Typha au niveau Regional Integration Quotations Envelope 15 05-13 du Diawling MR-MEDD-137891-CW-DIR / Renforcement de la Component 3: Strengthening 2020-01- résilience des communautés IDA / D2880 National Physical and Social Post Direct Selection Direct 0.00 Canceled 2019-10-02 2019-10-04 2019-10-04 02 et des écosystèmes de Investments Ndiago. MR-MEDD-156359-CW-RFQ / Mise en place d'une clôture Component 3: Strengthening Pending Request for Single Stage - One 2020-04- grillagée autour de la marre à IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2020-02-10 2020-03-05 Quotations Envelope 19 Spartine à la Baie de l'Etoile Investments ion de Nouadhibou (phase II) MR-MEDD-170442-CW-RFQ Component 3: Strengthening Pending Request for Single Stage - One 2020-11- / Construction de Loges des IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2020-05-13 2020-07-08 Quotations Envelope 05 agents de surveillance Investments ion Page 1 MR-MEDD-170443-CW-RFQ Component 3: Strengthening Pending Request for Single Stage - One 2020-11- / Travaux de fixation des IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2020-06-13 2020-08-08 Quotations Envelope 06 dunes au diawling Investments ion MR-MEDD-170445-CW-RFQ Component 3: Strengthening Pending Request for Single Stage - One 2020-10- / Clôture grillagée fixation IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2020-05-14 2020-07-09 Quotations Envelope 17 dunes au Diawling Investments ion MR-MEDD-170447-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2021-02- 2020- / Travaux de coupe de typha IDA / D2880 National Physical and Social Post Limited 33,708.59 Completed 2020-06-24 2020-03-05 2020-08-19 2020-03-23 Quotations Envelope 15 04-24 au Parc National du Diawling Investments MR-MEDD-170449-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2020-10- 2020- / Mise en place de pépinière IDA / D2880 National Physical and Social Post Limited 29,996.09 Completed 2020-06-24 2020-03-10 2020-08-19 2020-03-25 Quotations Envelope 03 06-08 de mangroves au Diawling Investments MR-MEDD-170453-CW-RFQ Component 3: Strengthening / clôture pour protéger les Request for Single Stage - One 2020-11- 2020- IDA / D2880 National Physical and Social Post Limited 24,131.97 Completed 2020-06-13 2020-06-05 2020-08-08 2020-06-23 plantations de mangroves au Quotations Envelope 16 07-20 Investments Diawling Component 3: Strengthening MR-MEDD-170456-CW-RFQ Request for Single Stage - One 2020-11- 2020- IDA / D2880 National Physical and Social Post Limited 14,446.54 Completed 2020-07-16 2020-07-10 2020-09-10 2020-07-24 / Plantation de mangroves Quotations Envelope 09 08-10 Investments MR-MEDD-170457-CW-RFQ Component 3: Strengthening Pending / Travaux d’entretien des Request for Single Stage - One 2020-10- IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2020-05-15 2020-07-10 couloirs et de coupe de Typha Quotations Envelope 08 Investments ion déjà réalisés MR-MEDD-170572-CW-RFB / Travaux de réhabilitation et Component 3: Strengthening Pending 2021-05- extension de la digue Nord du IDA / D2880 National Physical and Social Post Request for Bids Open - National 0.00 Implementat 2020-08-10 2020-09-09 2020-10-09 2020-10-29 2020-11-28 27 Parc National du Diawling Investments ion (PND) MR-MEDD-170567-CW-RFB Component 2: Strengthening Pending Single Stage - One 2022-05- / Travaux de fixation de IDA / D2880 the Policy and Institutional Post Request for Bids Open - International 0.00 Implementat 2021-01-04 2021-01-19 2021-03-02 2021-04-01 2021-05-06 Envelope 03 dunes du littoral Framework ion MR-MEDD-178901-CW-RFQ Component 3: Strengthening / Entretien des claies et du Request for Single Stage - One 2020-07- 2020- IDA / D2880 National Physical and Social Post Limited 16,815.78 Completed 2020-06-15 2020-06-23 2020-06-28 2020-07-10 reboisement (au niveau du Quotations Envelope 28 07-23 Investments PND) MR-MEDD-200677-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2021-02- / Construction d’un poste de IDA / D2880 National Physical and Social Post Limited 34,654.84 Signed 2020-11-15 2020-10-26 2021-01-10 2020-12-07 Quotations Envelope 24 surveillance au PND Investments MR-MEDD-200725-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2021-04- 2020- / Mise en place d’une IDA / D2880 National Physical and Social Post Limited 16,021.62 Completed 2020-11-22 2020-10-26 2021-01-17 2020-11-11 Quotations Envelope 17 12-07 pépinière d’Acacias Investments MR-MEDD-200729-CW-RFQ Component 3: Strengthening Pending Request for Single Stage - One 2021-05- / Entretien des travaux et IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2020-12-21 2021-02-15 Quotations Envelope 16 couloirs déjà réalisés Investments ion MR-MEDD-200730-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2021-04- 2020- / Entretien de 15 ha coupés IDA / D2880 National Physical and Social Post Limited 18,441.49 Completed 2020-11-25 2020-10-23 2021-01-20 2020-11-11 Quotations Envelope 20 12-17 en 2020 Investments MR-MEDD-200733-CW-RFQ Component 3: Strengthening Pending Request for Single Stage - One 2021-05- / Coupe de 50 ha de Typha IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2020-12-26 2021-02-20 Quotations Envelope 21 dans le bassin de BELL Investments ion MR-MEDD-225606-CW-RFQ Component 3: Strengthening Pending Request for Single Stage - One 2021-06- / Entretien des sites de IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2021-03-27 2021-05-16 Quotations Envelope 30 pépinières mangroves Investments ion MR-MEDD-225608-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2021-06- 2021- / Clôture de plantations de IDA / D2880 National Physical and Social Post Limited 57,763.54 Completed 2021-04-03 2021-03-26 2021-05-09 2021-04-01 Quotations Envelope 08 04-13 mangroves Investments MR-MEDD-225609-CW-RFQ Component 3: Strengthening Request for Single Stage - One 2021-06- 2020- / Reboisement des zones de IDA / D2880 National Physical and Social Post Limited 15,365.45 Completed 2021-04-10 2021-06-10 2021-05-30 2020-07-24 Quotations Envelope 02 08-10 mangroves Investments MR-MEDD-170569-CW-RFB Component 3: Strengthening Single Stage - One 2022-01- / Travaux pour le colmatage IDA / D2880 National Physical and Social Post Request for Bids Open - International 0.00 Canceled 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 Envelope 29 des brèches Investments MR-MEDD-170571-CW-RFB / Travaux pour la réalisation Component 3: Strengthening de passages de Single Stage - One 2021-09- IDA / D2880 National Physical and Social Post Request for Bids Open - National 0.00 Canceled 2020-11-16 2020-11-21 2021-01-02 2021-02-01 2021-03-08 franchissement du cordon Envelope 04 Investments dunaire et équipement des passages piétons MR-MEDD-75953-CW-RFQ / Component 3: Strengthening Mise en place de de bacs à Request for Single Stage - One 2019-08- IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-12-17 2019-02-11 fleurs pour la sécurisation du Quotations Envelope 10 Investments littoral MR-MEDD-74188-CW-RFQ / Component 3: Strengthening Request for Single Stage - One 2019-07- Aménagement du site de l'éco- IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-11-20 2019-01-15 Quotations Envelope 14 loge Investments MR-MEDD-75993-CW-RFQ / Travaux de restauration des Component 3: Strengthening paysages des carrières de Request for Single Stage - One 2019-07- IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-12-05 2019-01-30 coquillages en frange Quotations Envelope 29 Investments continentale du cordon dunaire du littoral MR-MEDD-74189-CW-RFQ / Component 3: Strengthening Request for Single Stage - One 2019-10- Travaux de construction de IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2019-02-09 2019-04-06 Quotations Envelope 03 l'éco-loge Investments Page 2 MR-MEDD-82725-CW-RFQ / Component 2: Strengthening mise en place d'une pépinière Request for Single Stage - One 2019-06- IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2018-10-27 2018-12-22 pour les besoins de la fixation Quotations Envelope 20 Framework des dunes du littoral MR-MEDD-200772-CW-RFB Component 3: Strengthening / Travaux de construction du Single Stage - One 2022-04- IDA / D2880 National Physical and Social Post Request for Bids Open - National 0.00 Canceled 2020-12-30 2021-01-04 2021-02-15 2021-03-17 2021-04-21 siège de l'Observatoire Envelope 21 Investments National du Littoral MR-MEDD-170440-CW-RFQ Component 3: Strengthening / Confection et mise en place Request for Single Stage - One 2020-09- IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2020-05-26 2020-07-21 de bacs pour la sécurisation Quotations Envelope 19 Investments du littoral MR-MEDD-75951-CW-RFQ / Component 3: Strengthening Travaux pour passages de Request for Single Stage - One 2019-09- IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2019-01-15 2019-03-12 piétons sur le cordon dunaire Quotations Envelope 08 Investments de NKTT MR-MEDD-232482-CW-RFQ Request for Component 3: Strengthening Pending / Entretenir les claies de Request for Single Stage - One Quotations 2021-12- IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2021-07-17 2021-09-11 fixations des dunes et les Quotations Envelope (Non Bank- 10 Investments ion bacs de protection SPD) Request for MR-MEDD-232485-CW-RFQ Component 3: Strengthening Pending Request for Single Stage - One Quotations 2021-11- / Réaliser les travaux de IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2021-06-27 2021-08-16 Quotations Envelope (Non Bank- 14 fixation des dunes Investments ion SPD) MR-MEDD-232486-CW-RFQ Request for Component 3: Strengthening Pending / Faire une clôture grillagée Request for Single Stage - One Quotations 2021-12- IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2021-07-10 2021-09-04 autour des sites fixés (fixation Quotations Envelope (Non Bank- 03 Investments ion biologique) du cordon dunaire SPD) MR-MEDD-232488-CW-RFQ Request for Component 3: Strengthening Pending / Reboisement de 10000 Request for Single Stage - One Quotations 2021-10- IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2021-06-27 2021-08-22 plants d’Acacia tortilles au Quotations Envelope (Non Bank- 21 Investments ion PND SPD) Request for MR-MEDD-232508-CW-RFB Component 3: Strengthening Bids - Works Pending / Réaliser les travaux de Single Stage - One 2023-03- IDA / D2880 National Physical and Social Post Request for Bids Open - National (without 0.00 Implementat 2021-11-15 2021-11-20 2022-01-01 2022-01-31 2022-03-07 colmatage des 3 brèches (9, Envelope 07 Investments prequalificati ion 13 et 16) on) SPD MR-MEDD-232510-CW-RFB Request for / Réaliser les travaux pour le Component 3: Strengthening Bids - Small Pending Single Stage - One 2023-03- passage de franchissement du IDA / D2880 National Physical and Social Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-11-15 2021-11-20 2022-01-01 2022-01-31 2022-03-07 Envelope 07 cordon dunaire et équipement Investments envelope ion pour le passage piéton process) MR-MEDD-232489-CW-RFQ Request for / Entretenir les travaux, les Component 3: Strengthening Pending Request for Single Stage - One Quotations 2021-12- couloirs de pare-feu, les IDA / D2880 National Physical and Social Post Limited 0.00 Implementat 2021-07-19 2021-09-13 Quotations Envelope (Non Bank- 12 claies et le reboisement Investments ion SPD) réalisés en 2020 au PND National Procurement MR-MEDD-232506-CW-RFB Component 2: Strengthening Pending Single Stage - One Document - 1 2023-02- / Construire le siège de IDA / D2880 the Policy and Institutional Post Request for Bids Open - National 0.00 Implementat 2021-10-15 2021-10-20 2021-12-01 2021-12-31 2022-02-04 Envelope Envelope 01 l'observatoire du littoral Framework ion process (Non Bank-SPD) National MR-MEDD-232511-CW-RFB Procurement / Réhabiliter les bacs Component 3: Strengthening Pending Single Stage - One Document - 1 2023-01- existants et faire l'extension IDA / D2880 National Physical and Social Post Request for Bids Open - National 0.00 Implementat 2021-09-16 2021-09-21 2021-11-02 2021-12-02 2022-01-06 Envelope Envelope 03 pour la sécurisation du Investments ion process (Non cordon dunaire du littoral Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74169-GO-RFQ / Component 2: Strengthening Acquisition d'équipements de Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 1,680.00 Completed 2018-10-06 2019-07-22 2018-12-01 2019-07-25 2019-05-30 2019-08-30 bureaux au profit de l'Autorité Quotations Envelope Framework de la Zone franche de NDB MR-MEDD-74201-GO-RFQ / Acquisition de matériel pour Component 3: Strengthening Request for Single Stage - One la surveillance des IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-12-01 2019-01-26 2019-07-25 Quotations Envelope investissements physiques Investments pour Diawling MR-MEDD-74203-GO-RFQ / Acquisition d'équipement Component 3: Strengthening Pending Request for Single Stage - One pour l'observatoire IDA / D2880 National Physical and Social Post Limited 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 Quotations Envelope ornithologique au niveau de Investments on Diawling MR-MEDD-74204-GO-RFB / Component 4: National Single Stage - One IDA / D2880 Post Request for Bids Open - National 91,573.20 Signed 2018-08-30 2018-12-27 2018-09-04 2018-10-16 2019-02-07 2018-11-15 2019-02-20 2018-12-20 2020-06-20 2019-06-18 Achat de véhicule Coordination Envelope MR-MEDD-75977-GO-RFQ / Acquisition d'équipements de Component 2: Strengthening Request for Single Stage - One surveillance et de secourisme IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2018-10-30 2018-12-25 2019-06-23 Quotations Envelope au profit de la Direction de la Framework Protection Civile MR-MEDD-75990-GO-RFQ / Component 3: Strengthening Request for Single Stage - One Mise en place de pépinières IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-11-10 2019-01-05 2019-07-04 Quotations Envelope de mangroves à Nouamghar Investments MR-MEDD-75995-GO-RFQ / Acquisition d'équipements Component 2: Strengthening Pending Request for Single Stage - One pour le réseau des IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 Quotations Envelope Parlementaires et élus locaux Framework on de l'environnement Page 3 MR-MEDD-75997-GO-RFQ / Component 2: Strengthening Pending Acquisition de matériel pour Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2018-12-04 2019-01-29 2019-07-28 la coordination du Master Quotations Envelope Framework on Gaed MR-MEDD-75998-GO-RFQ / Component 2: Strengthening Pending Acquisition d'équipements Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2018-11-04 2018-12-30 2019-06-28 pour l'opérationnalisation de Quotations Envelope Framework on la base de données du MEED MR-MEDD-76001-GO-RFQ / Acquisition d'équipements Component 2: Strengthening Request for Single Stage - One pour le laboratoire des études IDA / D2880 the Policy and Institutional Post Limited 26,828.15 Completed 2018-11-04 2020-08-17 2018-12-30 2020-10-01 2019-06-28 2021-01-13 Quotations Envelope environnementales et de Framework géographie (LEERG) MR-MEDD-76866-GO-RFQ / Component 3: Strengthening Pending Request for Single Stage - One Acquisition de matériel pour IDA / D2880 National Physical and Social Post Open - National 0.00 Implementati 2018-10-15 2018-12-10 2019-06-08 Quotations Envelope les AGR Investments on MR-MEDD-124789-GO-RFQ / impression de cartes de Component 3: Strengthening distributions des formations Request for Single Stage - One IDA / D2880 National Physical and Social Post Limited 16,666.67 Completed 2019-08-26 2019-12-09 2019-10-21 2019-12-17 2020-04-18 2020-01-13 de mangroves du BAS DELTA Quotations Envelope Investments DU FLEUVE SENEGAL rive droite. MR-MEDD-170370-GO-RFQ Component 2: Strengthening Pending / Équipements au profit des Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2020-05-15 2020-07-10 2020-08-09 Délégations Régionales de Quotations Envelope Framework on l'Environnement (littoral) MR-MEDD-170397-GO-RFQ Component 2: Strengthening Pending / Acquisition d'équipement de Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2020-08-25 2020-10-20 2020-12-04 bureau au profit de l'autorité Quotations Envelope Framework on de la zone franche MR-MEDD-170462-GO-RFQ Component 2: Strengthening Request for Single Stage - One / Acquisition d'équipements IDA / D2880 the Policy and Institutional Post Limited 34,879.93 Completed 2020-08-23 2020-08-24 2020-10-18 2020-09-08 2021-04-16 2020-09-14 Quotations Envelope au profit de la DAPL/MEDD Framework MR-MEDD-172830-GO-DIR / Pending Component 4: National logiciel gestion suivi- IDA / D2880 Post Direct Selection Direct 0.00 Implementati 2020-08-10 2020-08-15 2020-09-19 2020-09-28 Coordination évaluation (RUCH) on MR-MEDD-200669-GO-RFQ / Acquisition d’équipements Component 2: Strengthening Pending au profit de la Délégation Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2020-11-10 2021-01-05 2021-02-19 Générale de la Sécurité Civile Quotations Envelope Framework on et de la Gestion des Crises au MIDEC MR-MEDD-200671-GO-RFQ Component 2: Strengthening Pending Request for Single Stage - One / Acquisition d’équipements IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2020-11-10 2021-01-05 2021-02-19 Quotations Envelope au profit de l’ONM Framework on MR-MEDD-200683-GO-RFQ Component 2: Strengthening / Acquisition de matériel Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 35,730.93 Completed 2020-11-28 2020-10-26 2021-01-23 2020-11-11 2021-03-09 2020-12-15 optique pour l’Observatoire Quotations Envelope Framework du PND MR-MEDD-200687-GO-RFQ Component 2: Strengthening Pending Request for Single Stage - One / Acquisition d’un Drone IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2020-11-28 2021-01-23 2026-01-01 Quotations Envelope équipé au profit du PND Framework on MR-MEDD-221606-GO-RFQ / Acquisition de deux zodiacs Component 3: Strengthening équipés de tous ses Request for Single Stage - One IDA / D2880 National Physical and Social Post Limited 9,675.19 Signed 2021-02-28 2021-03-04 2021-03-21 2021-03-08 2021-04-20 2021-03-16 accessoires, gonflables, avec Quotations Envelope Investments moteur à bord capable de transporter 5 personnes MR-MEDD-221613-GO-RFQ Component 3: Strengthening Request for Single Stage - One / Acquisition de deux drones IDA / D2880 National Physical and Social Post Limited 8,016.59 Completed 2021-02-28 2021-03-04 2021-03-21 2021-03-08 2021-04-11 2021-03-16 Quotations Envelope équipés au profit du PND Investments MR-MEDD-225619-GO-RFQ Component 2: Strengthening Pending Request for Single Stage - One / Equipement de la salle de IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2021-04-04 2021-05-24 2021-07-08 Quotations Envelope réunion du MEDD Framework on MR-MEDD-172827-GO-RFB / Acquisition d'équipements Component 2: Strengthening Single Stage - One de surveillance et de IDA / D2880 the Policy and Institutional Post Request for Bids Open - International 0.00 Canceled 2020-08-18 2020-08-23 2020-10-04 2020-11-03 2020-12-08 2021-06-06 Envelope secourisme au profit de la Framework Direction de la Protection Civile MR-MEDD-200771-GO-RFB / Acquisition d'une ambulance Component 2: Strengthening équipée au Profit de la Single Stage - One IDA / 62150 the Policy and Institutional Post Request for Bids Open - National 0.00 Canceled 2020-11-30 2020-12-05 2021-01-16 2021-02-15 2021-03-22 2021-03-26 Délégation Générale de la Envelope Framework sécurité Civile et de la Gestion des crises au MIDEC MR-MEDD-200663-GO-RFQ Component 2: Strengthening / Acquisition d’équipements Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2020-11-04 2020-12-30 2021-02-13 au profit de la Police Quotations Envelope Framework Environnementale MR-MEDD-75959-GO-RFQ / Component 2: Strengthening Acquisition d'équipements Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2018-12-10 2019-02-04 2019-08-03 pour l'observatoire national Quotations Envelope Framework du littoral mauritanien MR-MEDD-170405-GO-RFQ Component 2: Strengthening / Acquisition de matériel pour Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2020-06-16 2020-08-11 2020-09-25 la coordination du Master Quotations Envelope Framework GAED MR-MEDD-75978-GO-RFQ / Component 2: Strengthening Request for Single Stage - One Acquisition d'équipements au IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2018-10-20 2018-12-15 2019-06-13 Quotations Envelope profit de l'ONM Framework Page 4 MR-MEDD-75988-GO-RFQ / Component 3: Strengthening Acquisition d'équipements Request for Single Stage - One IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-11-20 2019-01-15 2019-07-14 pour la fixation des dunes au Quotations Envelope Investments niveau de Chami MR-MEDD-74196-GO-RFQ / Component 3: Strengthening Achat de plants pour la Request for Single Stage - One IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-11-25 2019-01-20 2019-07-19 fixation biologique du cordon Quotations Envelope Investments dunaire de Diawling MR-MEDD-200674-GO-RFQ / Acquisition d’équipements Component 2: Strengthening Request for Single Stage - One au profit du Port Autonome de IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2020-11-15 2021-01-10 2021-07-09 Quotations Envelope Nouakchott, dit Port de Framework l’Amitié (PAN – PA) MR-MEDD-74193-GO-RFQ / Component 3: Strengthening Acquisition d'équipements et Request for Single Stage - One IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-10-13 2018-12-08 2019-06-06 de matériels de protection du Quotations Envelope Investments cordon dunaire de Diawling MR-MEDD-75979-GO-RFQ / Component 2: Strengthening Acquisition d'équipements Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2018-11-20 2019-01-15 2019-07-14 pour l'opérationnalisation du Quotations Envelope Framework plan POLMAR MR-MEDD-75952-GO-RFQ / Component 3: Strengthening Equipements pour passages Request for Single Stage - One IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2019-01-20 2019-03-17 2019-09-13 de franchissement du cordon Quotations Envelope Investments dunaire de NKTT MR-MEDD-200694-GO-RFQ / Acquisition de stations de Component 2: Strengthening Request for Single Stage - One mesures topographiques et de IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2020-11-28 2021-01-23 2021-03-09 Quotations Envelope GPS différentiels au profit de Framework la DPREM MR-MEDD-170352-GO-RFQ Component 2: Strengthening / Équipement du centre de Request for Single Stage - One IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2020-07-01 2020-08-26 2020-10-10 documentation électronique Quotations Envelope Framework de la CNOEZA MR-MEDD-232476-GO-RFQ / Acquisition des équipements pour les Component 2: Strengthening Pending Request for Single Stage - One Délégations Régionales de IDA / D2880 the Policy and Institutional Post Limited 0.00 Implementati 2021-06-20 2021-08-09 2021-08-12 Quotations Envelope l'Environnement (NDB, Framework on INCHIRI, NKTT NORD ET TRARZA) MR-MEDD-232502-GO-RFB / Acquisition de 7 véhicules au profit des Délégations Component 2: Strengthening Pending Single Stage - One Régionales de l'environnement IDA / D2880 the Policy and Institutional Post Request for Bids Open - National 0.00 Implementati 2021-07-20 2021-07-25 2021-09-05 2021-10-05 2021-11-09 2022-03-09 Envelope : NDB, INCHIRI, NKTT ET Framework on TRARZA, et du Cabinet du MEDD NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74195-NC-RFQ / Collecte et transport sur sites Component 3: Strengthening Request for Single Stage - One de matériaux de fixation IDA / D2880 National Physical and Social Post Limited 0.00 Canceled 2018-11-13 2019-04-02 2019-01-08 2019-07-07 Quotations Envelope mécanique de dunes au Investments niveau de Diawling MR-MEDD-170490-NC-RFQ Component 4: National Request for Single Stage - One / Maintenance et suivi IDA / D2880 Post Limited 18,116.74 Signed 2020-05-15 2020-03-05 2020-07-10 2020-03-11 2021-07-07 Coordination Quotations Envelope informatique MR-MEDD-170472-NC-DIR / Component 3: Strengthening Pending Opérationnalisation du IDA / D2880 National Physical and Social Post Direct Selection Direct 0.00 Implementati 2020-06-23 2020-07-08 2020-08-12 2021-02-08 mécanisme de gestion de Investments on plaintes (MGP) MR-MEDD-200678-NC-RFQ Component 2: Strengthening Request for Single Stage - One / Nettoyage de 35 villages au IDA / D2880 the Policy and Institutional Post Limited 0.00 Canceled 2020-11-28 2021-01-23 2021-03-09 Quotations Envelope PND Framework MR-MEDD-232496-NC-RFQ Component 3: Strengthening Pending Request for Single Stage - One / Recruter une ONG IDA / D2880 National Physical and Social Post Open - National 0.00 Implementati 2021-07-28 2021-10-22 2022-10-19 Quotations Envelope facilitatrice du MGP Investments on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74182-CS-QCBS / Component 2: Strengthening Consultant Elaboration de la directive IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 Canceled 2018-09-25 2018-10-16 2018-11-29 2018-12-29 2019-02-02 2019-08-01 d'aménagement du littoral de Framework Selection NDB MR-MEDD-74184-CS-QCBS / Component 2: Strengthening Consultant Pending Etude sur le classement de la IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 2018-09-20 2018-10-11 2018-11-24 2018-12-24 2019-01-28 2019-07-27 Implementation Baie de l'Etoile de NDB Framework Selection MR-MEDD-74207-CS-QCBS / Analyse du rapport EIE du Component 2: Strengthening Consultant projet Ahmeyin/Guembeul IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 Canceled 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 pour la production de gaz Framework Selection offshore en Mauritanie et au Sénégal Page 5 MR-MEDD-74256-CS-CQS / Component 3: Strengthening Consultant Pending Etude pour le franchissement IDA / D2880 National Physical and Social Post Qualification Limited 0.00 2018-10-08 2018-10-22 2018-11-21 2018-12-26 2019-06-24 Implementation du cordon dunaire de NKTT Investments Selection MR-MEDD-75957-CS-QCBS / Component 2: Strengthening Consultant Evaluation des risques liés IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 Canceled 2018-09-20 2018-10-11 2018-11-24 2018-12-24 2019-01-28 2019-07-27 aux inondations de la ville de Framework Selection NKTT MR-MEDD-75958-CS-QCBS / Component 2: Strengthening Consultant Elaboration de la directive IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 Canceled 2018-09-28 2018-10-19 2018-12-02 2019-01-01 2019-02-05 2019-08-04 d'aménagement du littoral de Framework Selection NKTT MR-MEDD-75960-CS-QCBS / Component 2: Strengthening Consultant Elaboration d'une stratégie de IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 Canceled 2018-09-21 2018-10-12 2018-11-25 2018-12-25 2019-01-29 2019-07-28 gestion intégrée du littoral Framework Selection mauritanien MR-MEDD-75970-CS-QCBS / Component 2: Strengthening Consultant Evaluation du capital IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 Canceled 2018-09-20 2018-10-11 2018-11-24 2018-12-24 2019-01-28 2019-07-27 sédimentologique de la ville Framework Selection de NKTT MR-MEDD-115364-CS-CQS / Etude de faisabilité pour la Component 3: Strengthening Consultant réhabilitation et l'extension de IDA / D2880 National Physical and Social Post Qualification Limited 0.00 Canceled 2019-05-27 2020-04-27 2019-06-03 2019-06-07 2019-06-14 2019-07-24 la digue de protection au Investments Selection niveau du Diawling MR-MEDD-115676-CS-CQS Component 3: Strengthening Consultant / Etude technique pour le Pending IDA / D2880 National Physical and Social Post Qualification Limited 0.00 2018-06-15 2018-06-29 2018-07-13 2018-08-10 2018-09-24 colmatage des brèches du Implementation Investments Selection littoral de Nouakchott MR-MEDD-117326-CS-QCBS / recrutement d'un cabinet Component 4: National Quality And Cost- Pending d'audit pour audit extezrne du IDA / D2880 Post Open - National 0.00 2019-05-29 2019-05-31 2019-06-08 2019-06-11 2019-06-14 2019-06-20 2019-06-23 2019-07-13 Coordination Based Selection Implementation projet pour les années 2018 2019 2020 et 2021. MR-MEDD-124791-CS-INDV / etude sur la mise en place du système Waves pour le littoral et l'espace maritime : Component 2: Strengthening Quality And Cost- evaluation des ecosystèmes IDA / D2880 the Policy and Institutional Post Open - International 0.00 Canceled 2019-09-12 2019-10-03 2019-11-16 2019-12-14 2020-01-13 2020-02-17 2020-03-23 2021-03-23 Based Selection physiqueset monetaire pour la Framework selection des comptes du capital naturel côtier . MR-MEDD-135519-CS-QCBS / Etude environnementale Component 2: Strengthening Quality And Cost- stratégique pour l'exploitation IDA / D2880 the Policy and Institutional Post Open - International 0.00 Canceled 2019-10-04 2019-10-06 2019-10-09 2019-10-14 2019-10-29 2019-11-03 2019-11-13 2019-12-13 Based Selection du sable noir sur le littoral Framework mauritanien MR-MEDD-157694-CS-CQS / Etude environnementale Component 2: Strengthening Consultant Under stratégique pour l'exploitation IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 2020-02-11 2020-02-06 2020-02-26 2020-04-10 2020-05-10 2020-06-14 2020-12-11 Implementation du sable noir sur le littoral Framework Selection mauritanien MR-MEDD-170561-CS-CQS Component 2: Strengthening Consultant / Élaboration des directives Under IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 2020-05-11 2020-10-19 2020-06-01 2021-02-03 2020-07-15 2020-08-14 2020-09-18 2020-12-17 d’aménagement du littoral de Implementation Framework Selection Nouakchott de Nouadhibou MR-MEDD-170480-CS-INDV / Action pilote de recherche Component 3: Strengthening Consultant (introduction de plantes Pending IDA / D2880 National Physical and Social Post Qualification Open - National 0.00 2020-07-15 2020-08-05 2020-09-18 2020-10-18 2020-11-22 2021-01-21 aquatiques, atténuation du PH Implementation Investments Selection de l’eau,…) de la mare de Riyad MR-MEDD-170427-CS-CQS Component 2: Strengthening Consultant / Etude impact IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 Canceled 2020-10-12 2020-08-03 2020-10-27 2020-12-10 2021-01-09 2021-02-13 2021-05-04 environnemental et social ( Framework Selection colmatage de brèches ) MR-MEDD-182813-CS-CQS / Réalisation de l'étude sur la Component 3: Strengthening Consultant caractérisation des déchets Pending IDA / D2880 National Physical and Social Post Qualification Open - International 0.00 2020-09-23 2020-10-14 2020-11-27 2020-12-27 2021-01-31 2021-03-17 urbains à Nouadhibou et Implementation Investments Selection proposition d'un système de gestion approprié MR-MEDD-200765-CS-CQS / accompagnement de l'UGP et des structures beneficiaires Consultant dans la mise en oeuvre des Component 4: National Under IDA / D2880 Post Qualification Limited 0.00 2020-05-04 2021-05-24 2020-05-18 2020-06-17 2020-07-22 2021-01-18 activitesd Coordination Implementation Selection investissement(identification des sites screening environnemental reporting...) MR-MEDD-182699-CS-CQS / accompagnement de l'UGP et des structures beneficiaires Component 2: Strengthening Consultant dans la mise en oeuvre des IDA / D2880 the Policy and Institutional Post Qualification Limited 0.00 Canceled 2020-07-01 2020-07-15 2020-08-14 2020-09-18 2020-12-17 activitesd Framework Selection investissement(identification des sites screening environnemental reporting...) MR-MEDD-200679-CS-INDV / Recrutement d'un formateur Component 2: Strengthening Consultant Pending pour la formation des IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 2020-12-17 2021-01-07 2021-02-20 2021-03-22 2021-04-26 2021-05-26 Implementation instituteurs en éducation Framework Selection environnementale au PND Page 6 MR-MEDD-211477-CS-CQS Component 3: Strengthening Consultant / Recrutement d'un cabinet Pending IDA / D2880 National Physical and Social Post Qualification Open - National 0.00 2021-02-05 2021-02-26 2021-04-11 2021-05-11 2021-06-15 2021-08-14 pour le Suivi des travaux de la Implementation Investments Selection Digue Nord MR-MEDD-228916-CS-CQS / Recrutement d'un cabinet Component 3: Strengthening Consultant pour le choix d’un site Under IDA / D2880 National Physical and Social Post Qualification Limited 0.00 2021-04-06 2021-06-17 2021-04-20 2021-05-20 2021-06-24 2021-12-21 d’Enfouissement Technique et Implementation Investments Selection de traitement des ordures ménagères à Nouakchott MR-MEDD-170566-CS-CQS / Étude pour la détermination du trait de côte du littoral Component 2: Strengthening Consultant mauritanien par images IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 Canceled 2020-06-15 2020-07-06 2020-08-19 2020-09-18 2020-10-23 2021-04-21 satellitaires avec quelques Framework Selection relevés du terrain par GNSS de N’Diago au Cap blanc MR-MEDD-170564-CS-CQS Component 2: Strengthening Consultant / Etude pour l’évaluation des IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 Canceled 2020-06-15 2020-07-06 2020-08-19 2020-09-18 2020-10-23 2021-10-20 risques liés aux inondations Framework Selection de Nouakchott et Nouadhibou MR-MEDD-192591-CS-CQS Component 2: Strengthening Consultant / Etude de la bathymétrie et IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 Canceled 2020-09-15 2020-09-30 2020-10-15 2020-10-30 2020-12-04 2021-06-02 de l'hydrométrie au PNBA Framework Selection MR-MEDD-76863-CS-QBS / élaboration de plans de Component 2: Strengthening Quality Based développement communaux IDA / D2880 the Policy and Institutional Post Open - National 0.00 Canceled 2018-09-26 2018-10-17 2018-11-30 2018-12-28 2019-01-27 2019-02-26 2019-04-02 2020-04-01 Selection pour Tevragh Zeine ,sebkha et Framework Elmina MR-MEDD-76873-CS-QCBS / Component 2: Strengthening Etude sur les pressions et Quality And Cost- IDA / D2880 the Policy and Institutional Post Open - International 0.00 Canceled 2018-10-08 2018-10-29 2018-12-12 2019-01-09 2019-02-08 2019-03-15 2019-04-19 2020-04-18 enjeux exercés sur l'espace Based Selection Framework vital du PNBA MR-MEDD-170392-CS-INDV Component 2: Strengthening Consultant / Etude de faisabilité sur la IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 Canceled 2020-05-20 2020-05-20 2020-06-10 2020-07-24 2020-08-23 2020-09-27 2020-12-26 délocalisation du site Framework Selection d'orpaillage de Chami MR-MEDD-170573-CS-CQS Component 3: Strengthening Consultant / Activités de renforcement de IDA / D2880 National Physical and Social Post Qualification Open - International 0.00 Canceled 2020-05-11 2020-07-06 2020-06-01 2020-07-15 2020-08-14 2020-09-18 2021-09-15 la résilience des populations Investments Selection de N’Diago MR-MEDD-232480-CS-CQS / Recrutement d’un Cabinet Component 2: Strengthening Consultant pour réaliser un état des Pending IDA / D2880 the Policy and Institutional Post Qualification Limited 0.00 2021-06-14 2021-06-28 2021-07-13 2021-08-17 2021-11-15 connaissances et des données Implementation Framework Selection disponibles sur le système côtier (situation de référence MR-MEDD-232491-CS-CQS Component 3: Strengthening Consultant / Recruter un bureau pour Pending IDA / D2880 National Physical and Social Post Qualification Open - National 0.00 2021-07-13 2021-08-03 2021-09-16 2021-10-16 2021-11-14 2022-02-12 assurer le contrôle et le suivi Implementation Investments Selection des travaux de la digue MR-MEDD-232494-CS-CQS / Élaborer une enquête statistique sur le nombre de ménages situés sur le littoral Consultant Component 4: National Pending ayant accès à des activités de IDA / D2880 Post Qualification Open - National 0.00 2021-08-10 2021-08-31 2021-10-14 2021-11-13 2021-12-12 2022-03-12 Coordination Implementation substances améliorées et sur Selection le score du niveau de satisfaction des populations du littoral MR-MEDD-232505-CS-CQS / Recrutement d’un Cabinet pour Faire une modélisation de la dynamique du littoral au Component 2: Strengthening Consultant Pending niveau du Port de N'Diago IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 2021-10-14 2021-11-04 2021-12-18 2022-01-17 2022-02-21 2022-08-20 Implementation pour mieux comprendre la Framework Selection problématique actuelle de l’érosion constatée et les mesures à prendre MR-MEDD-232513-CS-CQS / Recrutement d’un bureau pour Elaborer une EIES pour la Component 2: Strengthening Consultant Pending construction d'un Centre IDA / D2880 the Policy and Institutional Post Qualification Open - National 0.00 2021-09-15 2021-10-06 2021-11-19 2021-12-19 2022-01-23 2022-07-22 Implementation d'Enfouissement Technique Framework Selection des déchets de la ville de Nouakchott MR-MEDD-232504-CS-CQS / Recrutement d’un cabinet Component 2: Strengthening Consultant pour réaliser un audit IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 Under Review 2021-09-15 2021-06-10 2021-10-06 2021-11-19 2021-12-19 2022-01-23 2022-07-22 environnemental des usines Framework Selection de farine de poisson le long du littoral MR-MEDD-232481-CS-CQS / Recrutement d’un bureau de Component 3: Strengthening Consultant contrôle et de suivi des IDA / D2880 National Physical and Social Post Qualification Open - National 0.00 Under Review 2021-06-21 2021-06-21 2021-07-12 2021-08-25 2021-09-24 2021-10-29 2022-04-27 travaux de colmatage des 3 Investments Selection brèches (9, 13 et 16) MR-MEDD-234410-CS-CQS / Recrutement d’une ONG Component 3: Strengthening Consultant Pending pour le suivi de Projets IDA / D2880 National Physical and Social Post Qualification Limited 0.00 2021-06-15 2021-06-29 2021-07-29 2021-09-02 2021-11-01 Implementation Sociaux et AGR dans la Investments Selection Communes de Tevragh Zeina MR-MEDD-234411-CS-CQS / Recrutement d’une ONG Component 3: Strengthening Consultant Pending pour le suivi de Projets IDA / D2880 National Physical and Social Post Qualification Limited 0.00 2021-07-15 2021-07-29 2021-08-28 2021-10-02 2021-12-01 Implementation Sociaux et AGR dans la Investments Selection Communes de Sebkha Page 7 MR-MEDD-234406-CS-CQS / Recrutement d’une ONG Component 3: Strengthening Consultant Pending pour le suivi de Projets IDA / D2880 National Physical and Social Post Qualification Limited 0.00 2021-07-15 2021-07-29 2021-08-28 2021-10-02 2021-12-31 Implementation Sociaux et AGR dans la Investments Selection Communes d’El Mina MR-MEDD-232512-CS-CQS / Élaborer une étude de faisabilité (technique et Component 2: Strengthening Consultant financière) pour la Pending IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 2021-07-20 2021-08-10 2021-09-23 2021-10-23 2021-11-27 2022-05-26 construction d'un Centre Implementation Framework Selection d'Enfouissement Technique des déchets solides urbains de Nouakchott MR-MEDD-232514-CS-CQS / Recrutement d’un bureau pour Mener les études prioritaires nécessaires pour (i) suivre l’impact du Component 2: Strengthening Consultant Pending changement climatique sur le IDA / D2880 the Policy and Institutional Post Qualification Open - International 0.00 2021-06-15 2021-07-06 2021-08-19 2021-09-18 2021-10-23 2022-01-21 Implementation littoral, (ii) faire une analyse Framework Selection historique de l’évolution du trait de côte et (iii) fournir les données essentielles aux évalu INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74127-CS-INDV / Diagnostic et évaluation de la Component 2: Strengthening Individual capacité de tous les Under IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-08-17 2019-03-28 2018-08-22 2018-09-12 2018-10-17 2019-04-15 organismes concernés avec Implementation Framework Selection l'OLM (inclus consultations, séminaires, ateliers) MR-MEDD-74130-CS-INDV / Component 2: Strengthening Individual Pending Elaboration des plans de IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-08-20 2018-08-25 2018-09-15 2018-10-20 2019-04-18 Implementation résilience de N'Diago Framework Selection MR-MEDD-74133-CS-INDV / Identification des actions Component 2: Strengthening Individual prioritaires de l'antenne Pending IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-10-10 2018-10-15 2018-11-05 2018-12-10 2019-06-08 nationale de la MOLOA (inclus Implementation Framework Selection consultations, ateliers, séminaires) MR-MEDD-74135-CS-INDV / Component 3: Strengthening Individual Elaboration de textes IDA / D2880 National Physical and Social Post Consultant Limited 14,000.00 Completed 2018-11-02 2019-02-05 2018-11-07 2019-02-02 2018-11-28 2019-01-02 2019-02-25 2019-07-01 2020-02-10 juridiques relatifs aux Investments Selection principes pollueur-payeurs MR-MEDD-74137-CS-INDV / Conception et mise en place d'une plateforme de gestion Component 2: Strengthening Individual environnementale relative à IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2018-09-03 2018-09-08 2018-09-29 2018-11-03 2019-05-02 l'évaluation des activités et le Framework Selection suivi de leurs impacts environnementaux sur le littoral mauritanien MR-MEDD-74141-CS-INDV / Analyse du cadre foncier Component 2: Strengthening Individual Under relatif au littoral (inclus IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-10-15 2020-12-16 2018-10-20 2018-11-10 2018-12-15 2019-06-13 Implementation consultations, séminaires, Framework Selection ateliers) MR-MEDD-74152-CS-INDV / Component 2: Strengthening Individual Elaboration de guide des Pending IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-11-01 2018-11-06 2018-11-27 2019-01-01 2019-06-30 acteurs et des métiers du Implementation Framework Selection littoral mauritanien MR-MEDD-74153-CS-INDV / Revue et amendement du Component 2: Strengthening Individual système des études d'impact IDA / D2880 the Policy and Institutional Post Consultant Limited 36,000.00 Signed 2018-10-01 2020-02-11 2018-10-06 2020-05-30 2018-10-27 2020-06-02 2018-12-01 2020-06-30 2019-05-30 environnemental en Framework Selection Mauritanie MR-MEDD-74164-CS-INDV / Recrutement d'un assistant Component 2: Strengthening Individual Pending technique au profit de IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2018-09-13 2018-11-01 2018-11-22 2018-12-27 2019-06-25 Implementation l'Autorité de la Zone franche Framework Selection de NDB MR-MEDD-74175-CS-INDV / Component 2: Strengthening Individual Etat des lieux de Under IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-11-01 2018-12-20 2018-11-06 2018-11-27 2019-01-01 2019-06-30 l'environnement au niveau de Implementation Framework Selection la Zone franche de NDB MR-MEDD-74194-CS-INDV / Component 3: Strengthening Individual Etudes de faisabilité des Under IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2018-10-01 2018-11-24 2018-10-06 2018-10-27 2018-12-01 2019-05-30 travaux de fixation du cordon Implementation Investments Selection dunaire de Diawling MR-MEDD-74199-CS-INDV / Recrutement d'un consultant Component 3: Strengthening Individual pour le suivi et le contrôle des IDA / D2880 National Physical and Social Post Consultant Limited 9,240.00 Completed 2018-11-05 2019-03-28 2018-11-10 2019-03-28 2018-12-01 2019-01-05 2019-03-28 2019-07-04 2019-04-02 travaux du cordon dunaire de Investments Selection Diawling MR-MEDD-74200-CS-INDV / Component 3: Strengthening Individual Elaboration d'une carte IDA / D2880 National Physical and Social Post Consultant Limited 17,280.00 Completed 2018-11-15 2019-03-28 2018-11-20 2019-03-28 2018-12-11 2019-01-15 2019-03-28 2019-07-14 2019-05-15 d'occupation des éco- Investments Selection systèmes de mangroves MR-MEDD-75945-CS-INDV / Component 3: Strengthening Individual Under Etude pour le franchissement IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2018-10-01 2019-02-12 2018-10-06 2018-10-27 2018-12-01 2019-05-30 Implementation du cordon dunaire de NKTT Investments Selection Page 8 MR-MEDD-75972-CS-INDV / Component 2: Strengthening Individual Pending Conception et mise en place IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-11-05 2018-11-10 2018-12-01 2019-01-05 2019-07-04 Implementation d'un site web pour l'OLM Framework Selection MR-MEDD-76164-CS-INDV / Component 2: Strengthening Individual Pending Recrutement d'un Comptable IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2018-08-31 2018-10-19 2018-11-09 2018-12-14 2019-06-12 Implementation pour le Projet Framework Selection MR-MEDD-76422-CS-INDV / Individual Component 4: National Under Recrutement d'un auditeur IDA / D2880 Post Consultant Limited 0.00 2018-09-12 2018-09-17 2018-10-08 2018-11-12 2019-05-11 Coordination Implementation interne Selection MR-MEDD-76867-CS-INDV / Component 3: Strengthening Individual Mise à jour du SIG de la IDA / D2880 National Physical and Social Post Consultant Open 0.00 Canceled 2018-12-04 2019-01-22 2019-02-12 2019-03-19 2019-09-15 Région de Nouakchott Investments Selection MR-MEDD-76868-CS-INDV / Component 3: Strengthening Individual Adaptation du fonds IDA / D2880 National Physical and Social Post Consultant Open 0.00 Canceled 2018-12-04 2019-01-22 2019-02-12 2019-03-19 2019-09-15 d'Investissement communal Investments Selection (région de NKTT) MR-MEDD-82701-CS-INDV / recrutement d'un consultant Component 2: Strengthening Individual national pour l'appui à l'étude Pending IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-10-29 2018-11-03 2018-11-24 2018-12-29 2019-06-27 de faisabilité du projet WACA- Implementation Framework Selection CCA en Mauritanie MR-MEDD-82704-CS-INDV / Component 2: Strengthening Individual Pending réalisation d'un documentaire IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2018-10-19 2018-10-24 2018-11-14 2018-12-19 2019-06-17 Implementation sur la baie de l'étoile Framework Selection MR-MEDD-82731-CS-INDV / Individual Component 4: National Pending Maintenance et suivi IDA / D2880 Post Consultant Limited 0.00 2018-11-19 2018-11-24 2018-12-15 2019-01-03 2019-07-02 Coordination Implementation informatique Selection MR-MEDD-82737-CS-INDV / accompagnement de l'UGP et des structures beneficiaires Component 3: Strengthening Individual dans la mise en oeuvre des IDA / D2880 National Physical and Social Post Consultant Limited 0.00 Canceled 2018-11-15 2018-11-20 2018-12-11 2019-01-15 2019-07-14 activitesd Investments Selection investissement(identification des sites screening environnemental reporting...) MR-MEDD-76859-CS-NPO / Component 3: Strengthening Individual Pending Mise en place d'un système de IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2018-11-01 2018-11-06 2018-11-27 2019-01-01 2019-06-30 Implementation Gestion de plaintes Investments Selection MR-MEDD-76166-CS-INDV / Component 2: Strengthening Individual Recrutement d'un IDA / D2880 the Policy and Institutional Post Consultant Limited 9,600.00 Signed 2018-09-05 2019-03-18 2018-09-10 2018-07-26 2018-10-01 2018-11-05 2019-07-31 2019-05-04 Responsable de Suivi- Framework Selection Evaluation MR-MEDD-76167-CS-INDV / Component 2: Strengthening Individual Pending Recrutement d'un Spécialiste IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2018-09-05 2018-10-24 2018-11-14 2018-12-19 2019-06-17 Implementation en communication Framework Selection MR-MEDD-76173-CS-INDV / Component 2: Strengthening Individual Recrutement en IDA / D2880 the Policy and Institutional Post Consultant Open 9,600.00 Signed 2018-09-05 2019-07-25 2018-10-24 2019-07-25 2018-11-14 2018-12-19 2019-08-01 2019-06-17 Développement Institutionnel Framework Selection MR-MEDD-76168-CS-INDV / Component 2: Strengthening Individual Recrutement d'un Spécialiste Pending IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 en Développement Social, Implementation Framework Selection sauvegarde sociale et genre MR-MEDD-76158-CS-INDV / Component 2: Strengthening Individual Recrutement Coordinateur du IDA / D2880 the Policy and Institutional Post Consultant Limited 4,320.00 Signed 2018-08-29 2017-09-28 2018-09-03 2017-09-28 2018-09-24 2017-09-28 2018-10-29 2020-01-02 2019-04-27 Projet WACA Framework Selection MR-MEDD-76160-CS-INDV / Component 2: Strengthening Individual Recrutement d'un IDA / D2880 the Policy and Institutional Post Consultant Limited 3,520.00 Signed 2018-08-29 2018-02-01 2018-09-03 2018-02-01 2018-09-24 2018-10-29 2018-05-02 2019-04-27 Coordinateur-Adjoint juriste Framework Selection pour le Projet WACA MR-MEDD-76162-CS-INDV / Component 2: Strengthening Individual Recrutement d'un IDA / D2880 the Policy and Institutional Post Consultant Limited 1,600.00 Signed 2018-08-29 2018-06-28 2018-09-03 2018-06-28 2018-09-24 2018-10-29 2018-08-02 2019-04-27 Responsable de Passation des Framework Selection Marchés MR-MEDD-115334-CS-INDV / Elaboration des TDR de Component 2: Strengthening Individual l'étude de détermination du Under IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2019-05-30 2019-10-01 2019-06-12 2019-06-14 2019-06-18 2019-07-08 trait de côte du Littoral Implementation Framework Selection mauritanien par GNSS de N'Diago au Cap blanc MR-MEDD-115272-CS-INDV Component 2: Strengthening Individual / Etude pour l'élaboration IDA / D2880 the Policy and Institutional Post Consultant Open 23,826.67 Completed 2019-05-30 2019-06-07 2019-06-13 2019-06-13 2019-06-15 2019-06-18 2019-06-21 2019-06-27 2019-08-05 2019-09-05 d'une stratégie et d'un plan de Framework Selection communication pour le Projet MR-MEDD-115327-CS-INDV / L'élaboration d'une étude Component 3: Strengthening Individual d'identification de sous- IDA / D2880 National Physical and Social Post Consultant Open 21,493.34 Completed 2019-05-30 2019-06-12 2019-06-11 2019-06-13 2019-06-13 2019-06-17 2019-06-27 2019-07-27 2019-09-05 projets dans les communes Investments Selection littorales MR-MEDD-115350-CS-INDV / Elaboration de cahier de Component 3: Strengthening Individual prescriptions techniques pour IDA / D2880 National Physical and Social Post Consultant Open 7,466.67 Signed 2019-05-30 2019-10-02 2019-06-12 2019-06-13 2019-06-17 2019-06-18 2019-06-20 2019-06-27 2019-07-16 le colmatage des brèches du Investments Selection cordon dunaire de Nouakchott MR-MEDD-115371-CS-CDS / Component 2: Strengthening Individual Etat des lieux du foncier du IDA / D2880 the Policy and Institutional Post Consultant Open 24,773.34 Completed 2019-05-30 2019-10-01 2019-06-11 2019-09-05 2019-06-13 2019-09-05 2019-06-17 2019-09-09 2019-08-16 2019-11-21 littoral de N'Diago et de la Framework Selection Zone Franche de Nouadhibou Page 9 MR-MEDD-124792-CS-INDV / Inventaire des textes Component 2: Strengthening Individual juridiques relatifs à la gestion IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2019-08-21 2019-08-26 2019-09-16 2019-10-21 2020-04-18 des zones côtières et marines Framework Selection et ratifications des protocoles de la convention d'Abidjan. MR-MEDD-129310-CS-CQS / Opérationalisation et Mise Component 3: Strengthening Under en place d'un système de IDA / D2880 National Physical and Social Post Direct Selection Direct 0.00 2019-09-24 2019-10-01 2019-09-27 2019-10-02 2020-03-30 Implementation gestion de plaintes pour le Investments Projet WACA MR-MEDD-74150-CS-INDV / Analyse et révision de Component 2: Strengthening Individual l'ordonnance relative au IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2019-10-22 2019-11-15 2019-11-20 2019-11-30 2020-01-09 littoral et élaboration des Framework Selection textes d'application MR-MEDD-149021-CS-INDV / Recrutement d'un consultant pour une mission d'assistance Individual pour la saisie, sur le STEP, de Component 1: Strengthening Pending IDA / D2880 Post Consultant Limited 0.00 2019-12-09 2019-12-11 2019-12-13 2019-12-17 2020-01-01 l’ensemble des marchés Regional Integration Implementation Selection passés par les Projets PGDP et WACA/Mauritanie au cours de l’exercice 2019. MR-MEDD-170446-CS-INDV Component 3: Strengthening Individual Under / suivi des travaux de fixation IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2020-05-29 2020-06-24 2020-06-13 2020-07-04 2020-08-08 2020-09-22 Implementation des dunes au Diawling Investments Selection MR-MEDD-170469-CS-INDV / Elaboration de l’étude d’impact environnemental ou Component 3: Strengthening Individual Under de notice d’impact IDA / D2880 National Physical and Social Post Consultant Open 0.00 2020-07-06 2020-11-11 2020-08-24 2021-05-26 2020-09-14 2021-05-26 2020-10-19 2021-04-17 Implementation environnemental pour Investments Selection l’extension de la digue Nord du PND MR-MEDD-170484-CS-INDV Component 3: Strengthening Individual Under / Expert Côtier (gestion IDA / D2880 National Physical and Social Post Consultant Open 0.00 2020-05-15 2020-07-09 2020-07-03 2020-07-24 2020-08-28 2021-08-25 Implementation intégrée des zones costières ) Investments Selection MR-MEDD-170486-CS-INDV / Expert en système de Component 3: Strengthening Individual gestion de l'information Under IDA / D2880 National Physical and Social Post Consultant Open 0.00 2020-06-15 2020-08-18 2020-08-04 2020-08-25 2020-09-29 2020-12-28 environnementale pour le Implementation Investments Selection littoral (Système de données et d'information) MR-MEDD-170488-CS-INDV Individual Component 4: National Under / Spécialiste en sauvegarde IDA / D2880 Post Consultant Open 0.00 2020-06-22 2020-05-20 2020-08-10 2020-08-31 2020-10-05 2021-01-03 Coordination Implementation environnementalement Selection MR-MEDD-170410-CS-INDV Component 2: Strengthening Individual Pending / Révision de l'ordonnance du IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-01-29 Implementation littoral Framework Selection MR-MEDD-170431-CS-INDV / Élaboration APS, APD et DAO Component 3: Strengthening Individual Under pour passage de IDA / D2880 National Physical and Social Post Consultant Open 0.00 2020-10-13 2020-09-10 2020-12-01 2021-06-01 2020-12-22 2021-06-02 2021-01-26 2021-04-26 Implementation franchissement du cordon Investments Selection dunaire MR-MEDD-170466-CS-INDV Component 3: Strengthening Individual / Elaboration des études (APS, IDA / D2880 National Physical and Social Post Consultant Open 26,669.01 Signed 2020-07-20 2020-05-08 2020-09-07 2020-06-02 2020-09-28 2020-06-02 2020-11-02 2020-06-24 2021-05-01 APD, DAO) de l’extension de Investments Selection la digue Nord du PND MR-MEDD-170420-CS-INDV Component 2: Strengthening Individual Pending / Révision du décret portant IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2020-06-08 2020-07-27 2020-08-17 2020-09-21 2020-11-05 Implementation création du FIE Framework Selection MR-MEDD-170408-CS-INDV Component 2: Strengthening Individual / Analyse de l'ordonnance du IDA / D2880 the Policy and Institutional Post Consultant Open 31,898.11 Signed 2020-05-11 2020-06-23 2020-06-29 2020-08-24 2020-07-20 2020-09-02 2020-08-24 2020-09-17 2020-10-08 littoral Framework Selection MR-MEDD-170478-CS-INDV Component 3: Strengthening Individual / Elaboration du Plan de Under IDA / D2880 National Physical and Social Post Consultant Open 0.00 2020-08-17 2021-05-24 2020-10-05 2021-05-17 2020-10-26 2021-05-24 2020-11-30 2021-05-29 gestion et d’exploitation de la Implementation Investments Selection mare de Riyad MR-MEDD-170430-CS-INDV Component 3: Strengthening Individual / Etude pour la préparation du Pending IDA / D2880 National Physical and Social Post Consultant Open 0.00 2020-06-22 2020-08-10 2020-08-31 2020-10-05 2021-01-03 dossier technique pour la Implementation Investments Selection fixation des dunes MR-MEDD-170476-CS-INDV / Réalisation de l’étude sur la Component 3: Strengthening Individual caractérisation des déchets IDA / D2880 National Physical and Social Post Consultant Open 0.00 Canceled 2020-08-10 2020-06-03 2020-09-28 2020-10-19 2020-11-23 2021-01-22 urbains à NDB et proposition Investments Selection d’un système de gestion approprié MR-MEDD-183319-CS-CDS / Complément à l'étude relative Component 3: Strengthening Pending à l'identification de sous- IDA / D2880 National Physical and Social Post Direct Selection Direct 0.00 2020-07-08 2020-07-18 2020-07-28 2020-08-04 Implementation projets sociaux dans les Investments communes littorales MR-MEDD-192575-CS-INDV Component 3: Strengthening Individual / Etude impact Pending IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2020-09-21 2020-09-26 2020-10-11 2020-11-15 2020-12-30 environnemental et social Implementation Investments Selection (colmatage de brèches) MR-MEDD-170422-CS-INDV Component 2: Strengthening Individual / Etude de la bathymétrie et IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-08-18 2020-09-05 2020-10-06 2020-10-27 2020-12-01 2021-03-01 de l'hydrométrie au PNBA Framework Selection Page 10 MR-MEDD-200718-CS-INDV / Recrutement d’un Component 3: Strengthening Individual Under Consultant pour l’élaboration IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2020-11-30 2021-06-10 2020-12-05 2020-12-26 2021-01-30 2021-03-31 Implementation du dossier technique pour la Investments Selection fixation des dunes du Littoral MR-MEDD-200735-CS-INDV / Recrutement d’un Expert Component 2: Strengthening Individual Pending d’appui pour la restauration et IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2020-12-25 2020-12-30 2021-01-20 2021-02-24 2021-04-10 Implementation la valorisation des Mangroves Framework Selection et du Sporobolus MR-MEDD-200747-CS-INDV / Recrutement d'un Expert Component 2: Strengthening Individual Under International en gestion du IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2020-12-15 2020-11-24 2021-02-02 2021-02-23 2021-03-30 2021-07-28 Implementation Littoral pour un appui à la Framework Selection DPREM MR-MEDD-200770-CS-CDS / Recrutement d’un Consultant Component 4: National Pending IDA / D2880 Post Direct Selection Direct 0.00 2020-09-15 2020-09-25 2020-10-20 2020-12-04 pour la formation sur STEP Coordination Implementation avec une assistance pour STEP MR-MEDD-203246-CS-INDV Individual Component 4: National Under / Recrutement d’un IDA / D2880 Post Consultant Limited 0.00 2020-09-10 2020-04-23 2020-09-15 2020-10-06 2020-11-10 2021-05-09 Coordination Implementation Coordinateur Adjoint Selection MR-MEDD-207334-CS-INDV / Etude de faisabilité de la Component 3: Strengthening Individual Under restauration et de la IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2020-12-04 2020-12-14 2020-12-09 2020-12-19 2021-01-14 2021-02-13 Implementation valorisation de mangroves au Investments Selection PND MR-MEDD-209747-CS-INDV / Recrutement de consultant (e) individuel (le) pour la réalisation d’une Notice Component 2: Strengthening Individual Under d’Impact Environnemental et IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2020-12-22 2020-12-23 2020-12-27 2020-01-20 2021-01-17 2021-01-29 2021-02-21 2021-04-22 Implementation Social (NIES) pour la Framework Selection construction du bâtiment devant abriter l’Observatoire du Littoral mauritanien (OLM). MR-MEDD-211476-CS-INDV Individual / Recrutement d'un Chef Component 4: National IDA / D2880 Post Consultant Open 0.00 Canceled 2021-01-15 2021-03-05 2021-03-26 2021-04-30 2022-04-27 comptable pour le Projet Coordination Selection WACA -Mauritanie Component 3: Strengthening Individual MR-MEDD-217842-CS-INDV Under IDA / D2880 National Physical and Social Post Consultant Direct 0.00 2021-02-09 2021-02-15 2021-02-11 2021-02-16 2021-02-20 2021-05-21 / Comptable du PGDP Implementation Investments Selection MR-MEDD-217844-CS-INDV Component 3: Strengthening Individual Under / Conseiller technique du IDA / D2880 National Physical and Social Post Consultant Direct 0.00 2021-02-09 2021-02-15 2021-02-11 2021-02-13 2021-02-16 2021-05-17 Implementation Coordinateur du PGDP Investments Selection Component 3: Strengthening Individual MR-MEDD-217850-CS-INDV Under IDA / D2880 National Physical and Social Post Consultant Direct 0.00 2021-02-09 2021-02-15 2021-02-11 2021-02-14 2021-02-19 2021-05-20 / Expert SIG du PGDP Implementation Investments Selection MR-MEDD-218369-CS-INDV Individual Component 4: National Under / Recrutement de l'Expert en IDA / D2880 Post Consultant Direct 0.00 2021-02-15 2021-05-23 2021-02-17 2021-02-20 2021-02-24 2022-02-24 Coordination Implementation suivi/évaluation Selection MR-MEDD-218371-CS-INDV Individual Component 4: National Under / Recrutement de l'Auditeur IDA / D2880 Post Consultant Direct 0.00 2021-02-15 2021-05-23 2021-02-17 2021-02-19 2021-02-23 2022-02-23 Coordination Implementation Interne Selection MR-MEDD-218374-CS-INDV Individual Component 4: National / Recrutement du Spécialiste IDA / D2880 Post Consultant Direct 0.00 Canceled 2021-02-15 2021-05-24 2021-02-17 2021-02-19 2021-02-23 2022-02-23 Coordination de Passation des Marchés Selection MR-MEDD-218375-CS-INDV Individual Component 4: National Under / Recrutement de l'assistant IDA / D2880 Post Consultant Direct 0.00 2021-02-15 2021-02-15 2021-02-17 2021-02-19 2021-02-23 2022-02-23 Coordination Implementation en passation de marchés Selection MR-MEDD-218377-CS-INDV Individual / Recrutement du spécialiste Component 4: National Under IDA / D2880 Post Consultant Direct 0.00 2021-02-15 2021-02-15 2021-02-17 2021-02-19 2021-02-23 2022-02-23 en Sauvegarde Sociale, Société Coordination Implementation Selection Civile et Genre MR-MEDD-218381-CS-INDV Individual Component 4: National Under / Recrutement d'un Spécialiste IDA / D2880 Post Consultant Direct 0.00 2021-02-15 2021-05-24 2021-02-17 2021-02-19 2021-02-23 2022-02-23 Coordination Implementation en Communication Selection MR-MEDD-218382-CS-INDV Individual Component 4: National Under / Recrutement de IDA / D2880 Post Consultant Direct 0.00 2021-02-15 2021-02-15 2021-02-17 2021-02-19 2021-02-23 2022-02-23 Coordination Implementation Coordinateur (ce) du Projet Selection MR-MEDD-219143-CS-INDV Individual Component 4: National Under / Recrutement d'un comptable IDA / D2880 Post Consultant Limited 20,016.68 2021-02-11 2021-03-19 2021-02-16 2021-02-25 2021-03-09 2021-02-01 2021-04-13 2021-10-10 Coordination Implementation en chef pour l'UGP Selection MR-MEDD-225611-CS-INDV / Recrutement d'un Consultant Individuel pour le Individual Component 4: National Under déroulement sur STEP des IDA / D2880 Post Consultant Direct 0.00 2021-03-22 2021-03-23 2021-04-01 2021-04-22 2021-05-21 2021-06-20 Coordination Implementation activités du Projet PGDP pour Selection les exercices 2019,2018 et 2017. MR-MEDD-200742-CS-INDV Component 2: Strengthening Individual / Recrutement d’un IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2020-12-25 2020-12-30 2021-01-20 2021-02-24 2021-04-25 consultant pour compléter Framework Selection l’étude sur la Baie de l’Etoile MR-MEDD-74185-CS-INDV / Component 2: Strengthening Individual Actualisation du plan IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2018-09-20 2018-11-08 2018-11-29 2019-01-03 2019-07-02 d'aménagement et de gestion Framework Selection de la Baie de l'Etoile de NDB Page 11 MR-MEDD-200710-CS-INDV / Recrutement d’un Component 2: Strengthening Individual Consultant pour compléter le IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2020-11-23 2020-11-28 2020-12-19 2021-01-23 2021-03-24 guide des acteurs et métiers Framework Selection du littoral MR-MEDD-170414-CS-INDV / Élaboration du décret Component 2: Strengthening Individual portant modalités du IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2020-05-11 2020-05-16 2020-06-06 2020-07-11 2020-10-09 fonctionnement de Framework Selection l'observatoire du littoral MR-MEDD-170415-CS-INDV Component 2: Strengthening Individual / Révision du décret portant IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2020-05-18 2020-05-23 2020-06-13 2020-07-18 2020-09-01 création du conseil consultatif Framework Selection du littoral MR-MEDD-74187-CS-INDV / Component 3: Strengthening Individual Etude relative à la mise en IDA / D2880 National Physical and Social Post Consultant Open 0.00 Canceled 2018-09-18 2018-11-06 2018-11-27 2019-01-01 2019-06-30 place de l'éco-loge Investments Selection MR-MEDD-170403-CS-INDV / Élaboration du Plan de Component 2: Strengthening Individual Gestion Environnementale et IDA / D2860 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-05-25 2020-07-13 2020-08-03 2020-09-07 2020-11-06 Sociale de la Zone Franche de Framework Selection Nouadhibou MR-MEDD-74191-CS-INDV / Component 2: Strengthening Individual Elaboration d'une carte de IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2018-11-13 2018-11-18 2018-12-09 2019-01-13 2019-07-12 potentialités de la Zone Framework Selection franche de NDB MR-MEDD-170401-CS-INDV Component 2: Strengthening Individual / Élaboration d'une carte de IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-08-25 2020-10-13 2020-11-03 2020-12-08 2021-06-06 potentialités pour la zone Framework Selection Franche de NDB MR-MEDD-170174-CS-INDV / Recrutement d'une assistance technique pour Component 2: Strengthening Individual l'intégration de la dimension IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-07-15 2020-09-02 2020-09-23 2020-10-28 2020-12-27 résilience climatique dans Framework Selection l'ensemble des stratégies du littoral MR-MEDD-74190-CS-INDV / Component 3: Strengthening Individual Elaboration d'un plan de IDA / D2880 National Physical and Social Post Consultant Open 0.00 Canceled 2018-09-19 2018-11-07 2018-11-28 2019-01-02 2019-07-01 gestion environnementale et Investments Selection sociale du site de l'éco-loge MR-MEDD-170425-CS-INDV / Etude sur l'état des lieux et Component 2: Strengthening Individual le mapping des bases de IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-07-20 2020-09-07 2020-09-28 2020-11-02 2021-05-01 données et systèmes Framework Selection géographiques des zones côtières de la Mauritanie MR-MEDD-74174-CS-INDV / Component 2: Strengthening Individual Actualisation du schéma IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2018-12-03 2018-12-08 2018-12-29 2019-02-02 2019-08-01 opérationnel de la Zone Framework Selection franche de NDB MR-MEDD-200714-CS-INDV / Recrutement d’un Consultant pour l’élaboration du décret portant modalités Component 3: Strengthening Individual du fonctionnement de IDA / D2880 National Physical and Social Post Consultant Limited 0.00 Canceled 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2021-02-05 l’Observatoire du Littoral et la Investments Selection révision du décret portant création du Conseil Consultatif du Littoral MR-MEDD-124785-CS-INDV / etude sur l'état des lieux et Component 2: Strengthening Individual le mapping des bases de IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2019-08-05 2019-08-10 2019-08-15 2019-09-12 2019-10-12 donnees et SIG des zones Framework Selection côtières et arides de la mauritanie. MR-MEDD-74154-CS-INDV / Rédaction des termes de Component 2: Strengthening Individual référence de l'étude relative IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2018-10-03 2018-10-08 2018-10-29 2018-12-03 2019-06-01 aux plans de résilience de Framework Selection N'Diago (inclus consultations, ateliers, séminaires) MR-MEDD-137101-CS-INDV / sélection d'un consultant Component 3: Strengthening Individual pour préparer le dossier IDA / D2880 National Physical and Social Post Consultant Limited 0.00 Canceled 2019-10-08 2019-10-13 2019-10-20 2019-10-23 2019-12-22 relatif aux fixations des dunes Investments Selection du littoral MR-MEDD-200737-CS-INDV / Recrutement d’un Component 2: Strengthening Individual consultant pour adapter le IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2020-12-24 2020-12-29 2021-01-19 2021-02-23 2021-04-24 guide de bonnes pratiques Framework Selection /pestes et pesticides MR-MEDD-74192-CS-INDV / Component 3: Strengthening Individual Evaluation des risques IDA / D2880 National Physical and Social Post Consultant Limited 0.00 Canceled 2018-12-17 2018-12-22 2019-01-12 2019-02-16 2019-08-15 d'inondations pour la ville de Investments Selection NBD MR-MEDD-170396-CS-INDV Component 2: Strengthening Individual / Etat de lieu de la pollution IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-09-15 2020-11-03 2020-11-24 2020-12-29 2021-06-27 métallique dans le milieu Framework Selection littoral de la baie du Lévrier MR-MEDD-158682-CS-INDV Component 2: Strengthening Individual / étude de faisabilité de la IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-02-13 2020-04-02 2020-04-23 2020-05-28 2020-11-24 délocalisation du Centre de Framework Selection traitement de l'or de Chami Page 12 MR-MEDD-74172-CS-INDV / Component 2: Strengthening Individual Analyse du schéma IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-01-29 2020-02-10 2020-03-18 2020-04-08 2020-05-13 2020-07-12 opérationnel de la Zone Framework Selection franche de NDB MR-MEDD-82696-CS-INDV / Component 2: Strengthening Individual recrutement d'un consultant IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2018-10-31 2018-11-20 2018-11-05 2018-11-26 2018-12-31 2019-06-29 pour appuyer la cellule Framework Selection Changement Climatique MR-MEDD-170400-CS-INDV / Etude pour réaliser un état des lieux des capacités des Component 2: Strengthening Individual usines de production de farine IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 Canceled 2020-07-15 2020-08-18 2020-09-02 2020-09-23 2020-10-28 2021-01-26 de poisson d'Elbountiya en Framework Selection matière de gestion environnementale MR-MEDD-157985-CS-INDV Component 2: Strengthening Individual / Etude de faisabilité de la IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 Canceled 2020-02-10 2020-02-19 2020-02-15 2020-02-26 2020-03-11 2020-04-10 délocalisation du centre de Framework Selection traitement de l'or à Chami MR-MEDD-232477-CS-INDV Individual / Recrutement d’un Component 4: National Pending IDA / D2880 Post Consultant Open 0.00 2021-05-25 2021-07-13 2021-08-03 2021-09-07 2022-09-04 spécialiste en développement Coordination Implementation Selection institutionnel MR-MEDD-232478-CS-INDV Component 2: Strengthening Individual Pending / Recrutement d’un juriste en IDA / D2880 the Policy and Institutional Post Consultant Limited 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2022-02-11 Implementation appui au MEDD Framework Selection MR-MEDD-232483-CS-INDV / Recrutement d’un Component 3: Strengthening Individual consultant Individuel pour Pending IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2021-07-14 2021-07-19 2021-08-09 2021-09-13 2021-12-12 Faire le contrôle et le suivi des Implementation Investments Selection travaux de fixation des dunes du littoral MR-MEDD-232484-CS-INDV / Un Consultant Individuel Component 3: Strengthening Individual Pending pour assurer le suivi des IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2021-06-28 2021-07-03 2021-07-24 2021-08-28 2022-02-24 Implementation travaux de franchissement et Investments Selection de construction de bacs MR-MEDD-232492-CS-INDV Component 3: Strengthening Individual Pending / Élaborer un plan genre pour IDA / D2880 National Physical and Social Post Consultant Open 0.00 2021-07-20 2021-09-07 2021-09-28 2021-10-27 2022-01-25 Implementation le projet Investments Selection MR-MEDD-232493-CS-INDV Component 3: Strengthening Individual / faire une évaluation Pending IDA / D2880 National Physical and Social Post Consultant Open 0.00 2021-07-19 2021-09-06 2021-09-27 2021-11-01 2022-01-30 environnementale et sociale Implementation Investments Selection des sous projets sociaux MR-MEDD-232495-CS-INDV Individual / Recrutement d’un Component 4: National Under IDA / D2880 Post Consultant Open 0.00 2021-08-10 2021-06-21 2021-09-28 2021-10-19 2021-11-17 2022-02-15 Consultant pour l’évaluation à Coordination Implementation Selection mi-parcours MR-MEDD-232497-CS-INDV / Evaluer les besoins (études, Component 3: Strengthening Individual données à acquérir) et définir Pending IDA / D2880 National Physical and Social Post Consultant Limited 0.00 2021-09-14 2021-09-19 2021-10-10 2021-11-14 2022-01-13 les indicateurs de suivi pour Implementation Investments Selection une meilleure compréhension de l’évolution du littoral MR-MEDD-232498-CS-INDV / Un Consultant Individuel Component 2: Strengthening Individual Pending pour Définir les objectifs, le IDA / D2880 the Policy and Institutional Post Consultant Open 0.00 2021-07-20 2021-09-07 2021-09-28 2021-11-02 2022-01-31 Implementation cadre et le contenu de Framework Selection l’Observatoire du Littoral MR-MEDD-236658-CS-INDV Individual / Recrutement du Spécialiste Component 4: National Under IDA / D2880 Post Consultant Open 0.00 2021-06-04 2021-06-02 2021-07-23 2021-08-13 2021-09-17 2022-09-14 de Passation des Marchés du Coordination Implementation Selection Projet WACA-Mauritanie Page 13 MALAWI WATERSHED SERVICES IMPROVEMENT PROJECT 18 MONTHS PROCUREMENT PLAN Project information: Malawi Watershed Services Improvement Project (MWASIP) - P167860 Project Implementation Agency: Ministry of Agriculture, Irrigation and Water Development, Malawi Date of the Procurement Plan: February 25, 2020 Period covered by this Procurement Plan: February 2020 to August 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Disposal of Public Assets Act, 2017 of the Republic of Malawi, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.4 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting 1 contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a) Procurement Approach and Prior Review Thresholds: The Procurement Arrangements as indicated in the below table will be used. The thresholds for the Bank’s prior review requirements are also provided in the table: Prior-review Thresholds for Procurement Methods Thresholds Procurem Substanti Works Goods, IT & Non-Consulting Shortlist of National ent al Services Consultants Type Risk ($`000) Works 10,000 Open Request Request Internatio for Engineerin Open Open for nal or Quotatio Open g& Nation Nationa Quotatio Consulting ICB n or internatio Constructio al or l or n or Services ($'000 National nal or ICB n NCB NCB National ($'000) Shoppin ($'000) Supervision ($'000) ($'000) Shopping g ($'000) ($'000) ($'000) Goods, IT 2,000 & Non- Consulting ≧ < ≦ ≧ < ≦ < ≦ Services Consultan 1,000 ts (Firms) Individual 300 7,000 7,000 200 1,000 1,000 100 200 300 Consultan ts 2 *These prior review thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The Ministry of Agriculture Irrigation and Water Development team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/Plan with Procurement Arrangements and Time Schedule: as per the table below: b) PROCUREMENT PLAN Works 1 2 3 4 5 6 7 8 9 Ref Contract Estimate Procurem Prequalifica Nationa Revie Expecte Expecte . (Description) d ent tion l w d bid d No. Cost Method/ (yes/no) Prefere by openin Contrac US$ Arrangem nce Bank g date t million ent (yes/no) (Prior Signatu / re Date Post) 1. Construction of 10 11,000,00 Open Post No Prior 30-Nov- 30-Mar- irrigation schemes in 0 Internation 20 21 Zomba, Machinga, al, RFB Ncheu and Neno Districts 2. Construction of 10 Small 10,050,00 Open Post No Prior 30-Nov- 24-Apr- Dams and medium size 0 Internation 20 21 multipurpose dams al, RFB 3. Construction of 8 high 7,000,000 Open Post No Post 15 Jan 15 Jun yielding boreholes and Internation 21 21 associated irrigation al, RFB facilities 4. Construction of 20 rain 5,000,000 Open Post No Post 10 Feb 10 Jun water harvesting National, 21 21 structures RFB Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimate Procurem Prequalifica Nationa Revie Expecte Expecte No. (Description) d ent tion l w d bid d Cost Method/ (yes/no) Prefere by openin Contrac US$ Arrangem nce Bank g date t million ent (yes/no) (Prior Signatu / re Date Post) 3 1. Procurement of 12 840,000 Open Post No Post 23-Apr- 15-Jun- motor vehicles National, 20 20 RFB 2. Procurement of 10 80,000 Limited, Post No Post 24-Mar- 28-Apr- motor cycles RFQ 20 20 3. Procurement of office 204,300 Open Post No Post 9-Apr-20 7-May- furniture (Desks, Chairs, National, 20 Filling Cabinets, RFB conference furniture, book shelves 4. Procurement of ICT 100,150 Open Post No Post 10-May- 8 Juy-20 equipment (20 Laptops, National, 20 and 5 supporting tools) RFB 5. Procurement of 20 15,600 Limited, Post No Post 26-Sep- 15-Dec- Tablets RFQ 20 20 6. Supply and of 1 Weather 2,000,00 Open, Post No Prior 6 Jun-20 29-Aug- radar and Associated 0 Internation 20 Accessories al, RFB 7. Procurement of 100,000 Open Post No Post 8-Mar-20 1-Jul-20 Financial Accounting National, Software maintenance RFB and Technical Support and user training Consultancy Services 1 2 3 4 5 6 7 Ref. Description of Assignment Estimat Selection Revie Expected Expected No. ed Method/ w date of Contract Cost Arrangeme by proposal Signature US$ nt Bank submissi Date (Prior / on Post) 1. Consulting Services to carry out 100,000 Open Post 12-Apr-20 10-Aug-20 Project Baseline Studies. National, CQS 2. Consulting Services for design, 1,000,00 Open Prior 12-Apr-20 10-Aug-20 design review, Construction 0 Internationa Supervision of 10 irrigation l, QCBS schemes and Water User Association (WUA) establishment 3. Consulting Services to update 500,000 Open Post 12-Apr- 11-Sep-20 ESIA and ESMP’s, and RAP Internationa 2020 preparation for 10 Irrigation l, QCBS Schemes 4. Consultancy Services to conduct 1,000,00 Open Prior 5-Apr-20 25-Jul-20 feasibility study and detailed 0 Internationa designs of 10 small and medium l, QCBS size multipurpose dams, including establishment of 4 1 2 3 4 5 6 7 Ref. Description of Assignment Estimat Selection Revie Expected Expected No. ed Method/ w date of Contract Cost Arrangeme by proposal Signature US$ nt Bank submissi Date (Prior / on community-based O&M Post) institutional arrangements 5. Consulting services for 500,000 Open Post 12-Apr- 11-Sep-20 Preparation of the ESIA and RAP Internationa 2020 for the Small and medium l QCBS Dams 6. Consulting services for detailed 400,000 Open Post 12-Apr- 11-Sep-20 design and supervision of 8 Internationa 2020 high yielding boreholes and l QCBS associated conveyance infrastructure 7. Consultancy Services for 400,000 Open Post 5-Apr-20 10-Aug-20 detailed design and Internationa Construction supervision of l, QCBS water harvesting structures 8. Consulting services for 200,000 Open Post 15-Aug-20 10-Dez-20 preparation of ESMPs and RAPs Internationa for high yielding boreholes and l QCBS water harvesting structures 9. Consulting services for (i) 1,000,00 Open Prior 15-Apr- 30-Sep-20 preparation and update 0 Internationa 2020 (including digitization) of l QCBS catchment management plans and micro-catchment plans (VLAPs) in the middle Shire River basin (SRBMP catchments in Blantyre, Neno, Ntcheu, Machinga, Zomba districts and (ii) delineation of priority hotspot catchments in the upper Shire (Balaka, Machinga, Zomba and Mangochi) and preparation catchment management plans and micro- catchment plans (VLAPs) 10. Consulting services for 1,000,00 Open Prior 15-Apr- 30-Sep- delineation of priority hotspot 00 Internationa 2020 2020 catchments in Linthipe, Bua, l QCBS and Dwangwa river basins, and preparation catchment management plans and micro- catchment plans (VLAPs) 11. Consulting services for social 1,000,00 Open Prior 15-Jul- 30-Nov- marketing 0 Internationa 2020 2020 l QCBS 12. Consulting services for design 800,000 Open Prior 15-Sep- 30-Jan-2020 of the PWS pilot for sediment Internationa 2020 reduction l QCBS 5 1 2 3 4 5 6 7 Ref. Description of Assignment Estimat Selection Revie Expected Expected No. ed Method/ w date of Contract Cost Arrangeme by proposal Signature US$ nt Bank submissi Date (Prior / on 13. PPP transaction advisory 800,000 Open Post) Prior 15-Apr- 30-Sep- services for development of Internationa 2020 2020 hydrological and climate l QCBS products and services (including market assessment) 14. Consulting services for 2,500,00 Open Prior 15-Sep- 30-Jan-2020 development and 0 Internationa 2020 operationalization of a l QCBS biophysical and ecological monitoring system (including capacity building) 15. Consulting services for update 1,000,00 Open Prior 15-Apr- 30-Sep- of agro-ecological zones, 0 Internationa 2020 2020 updated national forest cover l QCBS maps, land use and land cover maps (including map production) 16. Consulting services for 300,000 Open Post 15-Apr- 30-Sep- preparation of institutional Internationa 2020 2020 development plans for key l QCBS watershed institutions 17. Consulting services for 400,000 Open Prior 15-Apr- 30-Sep- independent verification of Internationa 2020 2020 performance of key watershed l QCBS institutions 18. Hiring of Financial Management 392,000 Open Prior 18-April- 8-Nov-20 Specialist National, 20 INDV 19. Hiring of Assistant Financial 157,000 Open Post 18-April- 8-Nov-20 Management Specialist National, 20 INDV 20. Hiring of Procurement 392,000 Open Prior 18-April- 8-Nov-20 Specialist National, 20 INDV 21. Hiring of Project Management 392,000 Open Prior 18-April- 8-Nov-20 Specialist National, 20 INDV 22. Hiring of Environmental 392,000 Open Prior 18-April- 8-Nov-20 Safeguards Specialist National, 20 INDV 23. Hiring of Social Safeguards 392,000. Open Prior 18-April- 8-Nov-20 Specialist 00 National, 20 INDV 24. Hiring of Monitoring and 392,000 Open Prior 18-April- 8-Nov-20 Evaluation Specialist National, 20 INDV 6 1 2 3 4 5 6 7 Ref. Description of Assignment Estimat Selection Revie Expected Expected No. ed Method/ w date of Contract Cost Arrangeme by proposal Signature US$ nt Bank submissi Date (Prior / on 25. Hire Technical Assistant in Land 216,400 Open Post) Post 18-Aug-20 10-Mar-21 Administration National, INDV RFB – Request for Bids; RFQ – Request for Quotations; CQS - Consultant’s Qualification Based Selection; QCBS - Quality and Cost Based Selection and; INDV - Individual Consultant Selection. 7 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 8 in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 9 Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 10 PROCUREMENT Malawi : Malawi Watershed Services Improvement Project PLAN General Information Country: Malawi Bank’s Approval Date of the Original Procurement Plan: 2020-08-28 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167860 GPN Date: 2020-08-28 Project Name: Malawi Watershed Services Improvement Project Loan / Credit No: IDA / D5860, IDA / 65790 M Executing Agency(ies): inistry of Agriculture, Irrigation and Water Development WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MW-MOAIWD-197898-CW- RFQ / Rehabilitation of Malawi Technical and Project Request for Single Stage - One 2021-07- IDA / 65790 Post Limited 200,000.00 350,823.54 Signed 2020-11-21 2020-12-14 2021-01-05 2021-04-01 Watershed Services Management Support Quotations Envelope 04 Improvement Project (MWASIP) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-MOAIWD-192192-GO- Technical and Project Single Stage - One RFB / Procurement of 12x 4x4 IDA / 65790 Post Request for Bids Open - National 840,000.00 722,254.69 Signed 2020-09-30 2020-10-02 2020-10-05 2020-10-06 2020-11-04 2020-11-04 2020-11-24 2020-11-11 2020-12-23 2021-04-01 2021-02-21 Management Support Envelope Double Cable Vehicles MW-MOAIWD-193096-GO- RFB / Supply and Delivery of Under Office Furniture including Technical and Project Single Stage - One IDA / 65790 Post Request for Bids Open - National 204,300.00 0.00 Implementati 2020-09-30 2020-10-14 2020-10-10 2020-12-11 2020-11-09 2020-11-24 2020-11-24 2020-12-22 2021-02-20 Desks, Executive Chairs, Management Support Envelope on Filling Cabinets, Conference Furniture and Book shelves MW-MOAIWD-196695-GO- Under Technical and Project Single Stage - One RFB / Procurement of ICT IDA / 65790 Post Request for Bids Open - National 100,150.00 0.00 Implementati 2020-10-08 2020-10-07 2020-10-13 2020-10-16 2020-11-12 2020-11-20 2020-12-12 2021-02-12 2020-12-31 2021-01-30 Management Support Envelope Equipment on MW-MOAIWD-231879-GO- Pending Technical and Project Request for Single Stage - One RFQ / Supply and Delivery of IDA / 65790 Post Limited 80,000.00 0.00 Implementati 2021-05-29 2021-07-06 2021-08-17 Management Support Quotations Envelope 10 Motorcycles on MW-MOAIWD-231887-GO- Pending Scaling up Landscape Request for Single Stage - One RFQ / Supply and Delivery of IDA / 65790 Post Limited 39,200.00 0.00 Implementati 2021-05-27 2021-07-04 2021-08-03 Restoration Quotations Envelope 50 Tablets on MW-MOAIWD-237722-GO- RFQ / Supply and Delivery of ICT Equipment (1 Heavy Duty Pending Technical and Project Request for Single Stage - One Photocopier, 3 Desktops and IDA / 65790 Post Limited 53,000.00 0.00 Implementati 2021-06-12 2021-07-16 2021-08-15 Management Support Quotations Envelope 3 UPS, 3 Printers, 25 External on Hard drives, and 56 Anti- virus. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-MOAIWD-190073-CS- QCBS / Consulting services for design review, Quality And Cost- Under construction supervision of IDA / D5860 Improving Watershed Services Prior Open - International 1,000,000.00 0.00 2020-08-28 2020-09-30 2020-09-11 2020-12-03 2020-10-30 2020-12-11 2020-12-25 2021-02-05 2021-03-19 2024-01-03 Based Selection Implementation irrigation schemes and establishment of Water User's Association MW-MOAIWD-190038-CS- QCBS / Consulting services for preparation of catchment management plans and micro- catchment plans (VLAPs) in Scaling up Landscape Quality And Cost- Under IDA / D5860 Prior Open - International 1,000,000.00 0.00 2020-08-31 2020-09-30 2020-09-14 2021-02-24 2020-10-26 2020-12-07 2020-12-21 2021-01-29 2021-03-05 2023-02-23 the upper and middle Shire Restoration Based Selection Implementation River basin, including delineation of priority hotspot catchments in the upper Shire River Basin MW-MOAIWD-190055-CS- QCBS / Consulting services for development and Technical and Project Quality And Cost- Under operationalization of a IDA / D5860 Prior Open - International 2,500,000.00 0.00 2020-08-28 2020-09-29 2020-09-11 2021-02-24 2020-10-30 2020-12-11 2020-12-25 2021-02-05 2021-03-12 2025-03-11 Management Support Based Selection Implementation biophysical and ecological monitoring system (including capacity building) MW-MOAIWD-190067-CS- QCBS / Consulting services for detailed design and Quality And Cost- Under IDA / D5860 Improving Watershed Services Post Open - International 400,000.00 0.00 2020-09-04 2020-09-01 2020-09-18 2020-12-10 2020-11-06 2021-03-14 2020-12-18 2021-01-01 2021-02-12 2021-03-26 2023-03-16 supervision of 8 high yielding Based Selection Implementation boreholes and associated conveyance infractructure Page 1 MW-MOAIWD-189997-CS- QCBS / Consulting services for feasibility study, detailed design and construction supervision of small and Quality And Cost- Under IDA / D5860 Improving Watershed Services Prior Open - International 1,000,000.00 0.00 2020-09-04 2020-09-30 2020-09-18 2020-12-02 2020-11-06 2020-12-18 2021-01-01 2021-02-12 2021-03-26 2024-01-10 medium sized multipurpose Based Selection Implementation dams including establishment of community based operational and maintenance institutional arrangements MW-MOAIWD-190044-CS- QCBS / Consulting services Scaling up Landscape Quality And Cost- Under for independent verification IDA / D5860 Post Open - International 400,000.00 0.00 2020-10-12 2020-11-02 2020-10-26 2021-02-03 2020-12-14 2021-03-30 2021-01-25 2021-02-08 2021-03-03 2021-04-07 2025-04-06 Restoration Based Selection Implementation services for all performance- based grants under the project MW-MOAIWD-226189-CS- QCBS / Consultancy for Development of Intergrated Technical and Project Quality And Cost- Under IDA / 65790 Post Open - National 200,000.00 0.00 2021-04-26 2021-04-14 2021-05-17 2021-06-07 2021-06-16 2021-07-16 2021-07-31 2021-08-25 2021-09-18 2022-03-17 MRDRMP and MWASIP Management Support Based Selection Implementation Management Iformation System MW-MOAIWD-237719-CS- Consultant CQS / Consultancy Services Technical and Project Pending IDA / 65790 Post Qualification Limited 20,000.00 0.00 2021-06-21 2021-07-05 2021-07-19 2021-08-03 2021-09-02 for Development of Website Management Support Implementation Selection for MWASIP INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-MOAIWD-217448-CS- CDS / Procurement of computerized Financial Technical and Project IDA / D5860 Post Direct Selection Direct 100,000.00 91,080.00 Signed 2021-02-05 2021-01-18 2021-02-15 2021-03-19 2021-04-05 2021-03-19 2021-10-02 Management and Accounting, Management Support Procurement and Monitoring and Evaluation System MW-MOAIWD-226185-CS- INDV / Individual Consulting Individual Services” for Development of Scaling up Landscape IDA / 65790 Post Consultant Open 25,000.00 0.00 Canceled 2021-04-12 2021-03-29 2021-05-28 2021-06-11 2021-07-05 2021-11-02 Manuals for Matching Grants Restoration Selection for Enhancing Agricultural Based Livelihoods MW-MOAIWD-226631-CS- CDS / Consultancy Services Technical and Project Under IDA / 65790 Post Direct Selection Direct 300,000.00 0.00 2021-04-12 2021-03-30 2021-04-26 2021-06-03 2021-11-30 to undertake Baseline Study Management Support Implementation for MRDRMP and MWASIP MW-MOAIWD-226182-CS- INDV / Individual Consulting Individual Services for Development of Scaling up Landscape Under IDA / 65790 Post Consultant Limited 20,000.00 0.00 2021-04-12 2021-03-31 2021-04-26 2021-05-06 2021-05-30 2021-09-27 Performance Based Grants Restoration Implementation Selection Manuals for Establishment of Productive Forest MW-MOAIWD-226179-CS- Individual INDV / Consultancy Services IDA / 65790 Improving Watershed Services Post Consultant 25,000.00 0.00 Under Review 2021-04-19 2021-04-23 2021-05-03 2021-05-08 2021-06-01 2021-10-29 for Development of Climate Selection Change and Meteological Bill MW-MOAIWD-227202-CS- Individual Under INDV / Consultancy for Social IDA / 65790 Improving Watershed Services Post Consultant Open 172,500.00 0.00 2021-04-06 2021-04-20 2021-05-22 2021-06-01 2021-06-25 2022-06-25 Implementation Marketing Campaign Selection MW-MOAIWD-227965-CS- INDV / Individual Consulting Individual Services” for Development of Under IDA / 65790 Improving Watershed Services Post Consultant Limited 25,000.00 0.00 2021-04-06 2021-04-06 2021-04-11 2021-04-26 2021-05-04 2021-10-01 Manuals for Matching Grants Implementation Selection for Enhancing Agricultural Based Livelihoods MW-MOAIWD-231892-CS- Individual INDV / Individual Consulting Scaling up Landscape IDA / 65790 Post Consultant Open 22,000.00 0.00 Under Review 2021-05-31 2021-05-27 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Services for Land Restoration Selection Administration Specialist MW-MOAIWD-231894-CS- INDV / Recruitment of Individual Individual Consultants as Technical and Project IDA / 65790 Post Consultant Open 151,000.00 0.00 Under Review 2021-05-26 2021-05-27 2021-07-14 2021-08-04 2021-09-08 2022-03-07 District Project Accountant (7 Management Support Selection Project Accountants for 7 Districts) MW-MOAIWD-237724-CS- INDV / Recruitment of Individual Technical and Project Under Individual Consultant as IDA / 65790 Prior Consultant Open 110,000.00 0.00 2021-06-15 2021-06-17 2021-07-27 2021-08-03 2021-08-23 2022-08-23 Management Support Implementation Assistant Procurement Selection Specialist MW-MOAIWD-237729-CS- Individual INDV / Recruitment of Technical and Project Under IDA / 65790 Prior Consultant Open 150,500.00 0.00 2021-06-15 2021-06-17 2021-07-27 2021-08-03 2021-08-23 2022-08-23 Individual Consultant as Management Support Implementation Selection Procurement Specialist Page 2 Sample Procurement Plan July 9, 2010 PROCUREMENT Nepal : Nepal-India Regional Trade And Transport Project PLAN General Information Country: Nepal Bank’s Approval Date of the Original Procurement Plan: 2017-05-17 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144335 GPN Date: Project Name: Nepal-India Regional Trade And Transport Project Loan / Credit No: IDA / 52730, / , IDA / H8630 Department of Roads, Ministry of Commerce Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NIRTTP/PCO/NITDB/W/ICB-7 / Construction and Modernize transport and Pending 2018-03- development of existing / transit arrangements between Post Request for Bids Open - International 1,100,000.00 0.00 Implementat 2016-05-20 2016-06-22 2016-07-23 2016-08-24 2016-09-17 16 railway tracks into ballastless Nepal and India ion tracks NIRTTP/PCO/PPD/W/NCB-9 / Construction of Sanitary and Strengthen Trade-Related Under 2018-07- Phyto-santary SPS/Plant IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 800,000.00 0.00 Implementat 2017-02-26 2017-12-26 2017-02-27 2017-12-27 2017-03-29 2017-03-30 2017-04-15 15 Quarantine and Regional Plant Nepal ion ProtectionLaboratory NIRTTP/PCO/NITDB/W/NCB- 3 / Construction of flexible Improve Select Trade-Related 1,014,567.5 2015-10- and rigid pavements with IDA / 52730 Prior Request for Bids Open - National 1,580,459.77 Signed 2013-10-07 2013-11-29 2014-01-14 2014-02-20 2014-03-12 2014-03-25 2014-04-22 Infrastructure 2 21 drains for pavement restoration at Bhairahawa ICD NIRTTP/PCO/DOTM/W/NCB- Modernize transport and Pending 6 / Consturction of 2017-03- / transit arrangements between Post Request for Bids Open - National 500,000.00 0.00 Implementat 2016-01-07 2016-01-24 2016-02-23 2016-03-10 2016-03-25 Weighbridges for Axle Load 24 Nepal and India ion Control -2 Nos NIRTTP/PCO/NITDB/W/ICB-1 Improve Select Trade-Related Single Stage - One 2019-01- / Extension of Storage Shed at IDA / 52730 Post Request for Bids Open - International 237,000.00 0.00 Canceled 2017-09-12 2017-09-17 2017-10-29 2017-11-28 2018-01-02 Infrastructure Envelope 02 Birgunj ICD NIRTTP/PCO/NITDB/W/ICB-1 Pending Improve Select Trade-Related Single Stage - One 2018-10- / Extension of Storage Shed at IDA / 52730 Post Request for Bids Open - International 237,000.00 0.00 Implementat 2018-01-10 2018-01-15 2018-02-26 2018-03-28 2018-05-02 Infrastructure Envelope 29 Birgunj ICD ion NIRTTP/PCO/NITDB/W/ICB-4 / Construction of Kathmandu Improve Select Trade-Related 18,700,000.0 13,288,546. 2019-05- IDA / 52730 Prior Request for Bids Open - International Signed 2018-01-15 2018-03-09 2018-01-15 2018-03-13 2018-03-06 2018-05-10 2018-05-05 2018-06-19 2018-06-29 2018-07-05 ICD/CFS (Part-A: Main Block Infrastructure 0 55 30 (Phase 1) NIRTTP/PCO/NITDB/W/NCB- 62 / Construction of Improve Select Trade-Related Single Stage - One 27,000,000.0 2,038,137.6 2019-12- IDA / 52730 Post Request for Bids Open - National Signed 2018-01-31 2018-01-19 2018-02-05 2018-03-20 2018-03-19 2018-04-18 2018-04-18 2018-06-18 2018-05-23 2018-07-11 Kathmandu ICD/CFS (Part-B: Infrastructure Envelope 0 0 24 Office and Quarters (Phase 1)) NIRTTP/PCO/DOC/W/RFQ-24 Strengthen Trade-Related Pending Request for Single Stage - One 2021-05- / Data Center maintenance in IDA / H8630 Institutional Capacity in Post Limited 12,500.00 0.00 Implementat 2021-02-03 2021-03-17 Quotations Envelope 16 Department of Customs Nepal ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NIRTTP/PCO/DOTM/G/SHP- Modernize transport and Pending Request for 23 / Procurement of Office / transit arrangements between Post Limited - National 2,200.00 0.00 Implementati 2015-10-05 2015-10-14 2015-11-05 Quotations Furniture for DoTM Nepal and India on NIRTTP/PCO/TEPC/G/NCB- 25 / Procurement of Deasktop Strengthen Trade-Related Under and Laptop Computers, and IDA / 52730 Institutional Capacity in Post Request for Bids Open - National 70,000.00 0.00 Implementati 2016-06-21 2018-05-06 2016-06-22 2018-05-07 2016-07-22 2018-06-06 2016-07-23 2016-07-31 2016-08-31 necessary equipments for Nepal on TEPC NIRTTP/PCO/DOTM/G/DC- Modernize transport and Pending 28 / Procurement of LED / transit arrangements between Post Direct Selection 42,000.00 0.00 Implementati 2016-09-21 2016-10-20 Television Screen and Memory Nepal and India on Sticks NIRTTP/PCO/PPD/G/SHP-29 / Procurement of Laptop Modernize transport and Pending Request for Computers, SLR Camera etc. / transit arrangements between Post Limited - National 5,600.00 0.00 Implementati 2016-11-22 2016-11-30 2016-12-31 Quotations for Plant Protection Nepal and India on Directorate NIRTTP/PCO/DOTM/G/NCB- 30 / Procurement of Server, Modernize transport and Under Smart Phone/Tabs, Laptop IDA / 52730 transit arrangements between Post Request for Bids Open - National 148,000.00 0.00 Implementati 2017-02-27 2017-03-05 2017-04-04 2017-04-10 2017-04-27 2017-06-26 Computers and necessary Nepal and India on equipment for RAIMS NIRTTP/PCO/DOTM/G/NCB- Modernize transport and Pending 31 / Printing of various Road / transit arrangements between Post Request for Bids Open - National 28,000.00 0.00 Implementati 2017-02-27 2017-03-05 2017-04-04 2017-04-10 2017-04-27 2017-06-26 Safety Regulations and Nepal and India on Materials NIRTTP/PCO/DOTM/G/SHP- 34 / Procurement of Modernize transport and Pending Request for Computers, Printers, GIS / transit arrangements between Post Limited - National 7,200.00 0.00 Implementati 2016-12-02 2016-12-21 2017-07-11 Quotations Software and furnitures for Nepal and India on DOTM Page 1 NIRTTP/PCO/G/SHP-35 / Modernize transport and Pending Supply and Installation of Request for / transit arrangements between Post Limited - National 11,000.00 0.00 Implementati 2017-01-06 2017-01-22 2017-02-21 Solar System with Batteries Quotations Nepal and India on and Power Inverter NIRTTP-MOCS-155-CP-B- NIRTTP/PCO/DOTM/G/S / Modernize transport and Pending Request for Single Stage - One Procurement of Computers, IDA / H8630 transit arrangements between Post Open - National 7,200.00 0.00 Implementati 2017-09-01 2017-10-27 2018-04-25 Quotations Envelope Printers, GIS Software and Nepal and India on furnitures for DOTM NIRTTP/PCO/G/SHP-39 / Strengthen Trade-Related Pending Request for Single Stage - One Procurement of Computer, IDA / H8630 Institutional Capacity in Post Limited 15,000.00 0.00 Implementati 2018-03-06 2018-05-01 2018-06-30 Quotations Envelope Laptop, Printer Nepal on NIRTTP/PCO/G/SHP- / Modernize transport and Supply and Installation of Request for / transit arrangements between Post Limited - National 11,000.00 0.00 Canceled 2013-12-02 2013-12-25 2014-07-15 Solar System with Batteries Quotations Nepal and India and Power-Inverter for PCO NIRTTP/PCO/DOC/G/NCB-32 / Procurement of Equipments Strengthen Trade-Related Single Stage - One for Custom Laboratory for IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 160,000.00 0.00 Canceled 2018-02-28 2018-04-04 2018-03-05 2018-04-04 2018-04-16 2018-05-07 2018-05-16 2018-07-05 2018-06-20 2018-12-17 Envelope kathmandu ( DoC ) & birgunj Nepal Customs Laboratory NIRTTP/PCO/DOC/G/NCB-63 Strengthen Trade-Related / Procurement of Lab Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 60,000.00 44,871.93 Signed 2018-03-15 2018-04-04 2018-03-20 2018-04-04 2018-05-01 2018-05-07 2018-05-31 2018-06-20 2018-07-05 2018-07-19 2019-01-01 Equipment for Department of Envelope Nepal Customs NIRTTP/PCO/TEPC/G/SHOPPI Strengthen Trade-Related Under NG-64 / Solar Backup System Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Open - National 16,000.00 0.00 Implementati 2018-05-20 2018-06-12 2018-07-15 2018-09-13 for Nepal Trade Information Quotations Envelope Nepal on Portal NIRTTP/PCO/G/SHP-33 / Modernize transport and Procurement of Office Request for / transit arrangements between Post Limited - National 9,200.00 0.00 Canceled 2016-11-26 2016-12-23 2017-07-15 Furniture, Fixtures and Quotations Nepal and India Furnishing for PCO NIRTTP/PCO/G/SHP-20 / Modernize transport and Request for Procurement of Stationery and / transit arrangements between Post Limited - National 8,800.00 0.00 Canceled 2015-10-11 2015-10-20 2015-10-20 Quotations Sundries for PCO Nepal and India NIRTTP/PCO/TEPC/G/SHP-26 Modernize transport and / Procurement of Office Request for / transit arrangements between Post Limited - National 5,000.00 0.00 Canceled 2016-07-16 2016-07-25 2016-08-25 Furniture and furnishing for Quotations Nepal and India TEPC NIRTTP/PCO/DOC/G/NCB-66 / Equipment for Custom Strengthen Trade-Related Single Stage - One Laboratory for kathmandu ( IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 160,000.00 149,478.74 Signed 2018-09-02 2019-01-01 2018-09-12 2019-01-10 2018-10-12 2019-01-28 2018-12-11 2019-03-31 2019-01-15 2019-04-22 2019-07-14 Envelope DoC ) & birgunj Customs Nepal Laboratory NIRTTP/PCO/PPD/G/NCB-69 Strengthen Trade-Related Pending Single Stage - One / Lab equipments and IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 50,000.00 0.00 Implementati 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-08-21 Envelope accessories for SPS Lab Nepal on NIRTTP/PCO/DOTM/G/NCB- Modernize transport and 79 / Hardware for Road Single Stage - One IDA / H8630 transit arrangements between Post Request for Bids Open - National 35,000.00 0.00 Canceled 2019-05-31 2019-06-05 2019-07-17 2019-08-16 2019-09-20 2020-01-18 Accident Information Envelope Nepal and India Management System( RAIMS) NIRTTP/PCO/TEPC/G/NCB- Strengthen Trade-Related Under 82 / Procurement of Desktop Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 78,000.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2020-05-19 and Laptop Computers, and Envelope Nepal on necessary equipment for TEPC NIRTTP/PCO/TEPC/G/NCB- Strengthen Trade-Related Under Single Stage - One 83 / SOlar Backup system for IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 42,000.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2020-03-20 Envelope NTIP ( TEPC) Nepal on NIRTTP/PCO/DOC/G/NCB-86 Strengthen Trade-Related / Installation of Scanning Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 270,000.00 0.00 Canceled 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2020-05-19 Electron microscope (SEM) Envelope Nepal with EDX Detector NIRTTP/PCO/DOC/G/NCB-87 / Installation of High Strengthen Trade-Related Pending Single Stage - One Performance Liquid IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 50,000.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-05 2019-10-05 2019-11-09 2020-03-08 Envelope Chromatography ( HPCL) for Nepal on DoC NIRTTP/PCO/DOC/G/NCB-89 Strengthen Trade-Related Pending Single Stage - One / Sport Utility Vehicles for IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 80,000.00 0.00 Implementati 2019-08-15 2019-08-20 2019-09-19 2019-10-19 2019-11-23 2020-03-22 Envelope NNSW PIU Office Nepal on NIRTTP/PCO/DOC/G/SHP-90 Strengthen Trade-Related Pending Request for Single Stage - One / Procurement of Business IDA / H8630 Institutional Capacity in Post Limited 9,000.00 0.00 Implementati 2019-08-09 2019-10-04 2019-11-03 Quotations Envelope Series Laptop (package-1) Nepal on NIRTTP/PCO/DOC/G/SHP-91 Strengthen Trade-Related Pending Request for Single Stage - One / Procurement of Branded IDA / H8630 Institutional Capacity in Post Limited 8,000.00 0.00 Implementati 2019-08-09 2019-09-06 2019-10-06 Quotations Envelope High End Laptop (package-2) Nepal on NIRTTP/PCO/DOC/G/SHP-92 Strengthen Trade-Related Pending / Procurement of It Equipment Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Limited 3,300.00 0.00 Implementati 2019-08-09 2019-09-06 2019-10-06 ( Printer,I-Pad & USB Hard Quotations Envelope Nepal on disk) (Package-3) NIRTTP/PCO/DOC/G/SHP-93 Strengthen Trade-Related Pending / Procurement of It Equipment Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Limited 4,700.00 0.00 Implementati 2019-08-09 2019-09-06 2019-10-06 ( Photocopy,Color Quotations Envelope Nepal on Printer,Scanner) Package-4 Page 2 NIRTTP-PCO-DOC-G-SHP-81 / IT Equipment & Accessories Strengthen Trade-Related Pending for NNSW PIU Office ( Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Open - National 20,000.00 0.00 Implementati 2019-10-06 2019-11-24 2019-12-24 Laptop,Desk Top, Quotations Envelope Nepal on Scanner,Printer,Photocopy, Vacuum Cleaner) -package-5 NIRTTP/PCO/DOC/G/SHP-84 Strengthen Trade-Related Pending Request for Single Stage - One / Procurement of Motorcycle IDA / H8630 Institutional Capacity in Post Limited 10,000.00 0.00 Implementati 2019-09-04 2019-10-16 2020-04-13 Quotations Envelope & Scooter for DoC Nepal on NIRTTP/PCO/G/SHP-87 / IT Strengthen Trade-Related Pending Request for Single Stage - One Equipment and other IDA / H8630 Institutional Capacity in Post Limited 9,000.00 0.00 Implementati 2019-09-04 2019-10-30 2020-04-27 Quotations Envelope Accessories for PCO Nepal on NIRTTP-PCO-DOTM-G-SHP- Modernize transport and Request for Single Stage - One 79 / Procurment of additional IDA / H8630 transit arrangements between Post Open - National 20,000.00 0.00 Canceled 2019-06-14 2019-08-02 2019-09-01 Quotations Envelope hardware for RAMIS Nepal and India NIRTTP/PCO/CAL/G/NCB- 104 / Supply & Installation of Strengthen Trade-Related Pending Lab Equipment for SPS /Plant Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 200,000.00 0.00 Implementati 2019-09-01 2019-09-06 2019-10-18 2019-11-17 2019-12-22 2020-04-20 Quarantine and Regional Plant Envelope Nepal on Protection Laboratory , Hariharbhawan, Lalitpur NP-MOC-133997-GO-DIR / Modernize transport and Pending Procurement of Smart phone IDA / H8630 transit arrangements between Post Direct Selection Direct 19,000.00 0.00 Implementati 2019-09-16 2019-09-30 2019-10-21 2019-11-05 for accident data collection Nepal and India on NIRTTP/PCO/DOC/G/SHP- 112 / Office equipment for Strengthen Trade-Related Pending NNSW, PIU Office (Office Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Limited 14,000.00 0.00 Implementati 2019-12-05 2020-01-10 2020-02-09 Table, Computer Table, Sofa Quotations Envelope Nepal on Set, Chairs, Cupboard, Carpets) NIRTTP/PCO/DOC/G/NCB- Strengthen Trade-Related Pending 113 / Supply and Deliver of Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 220,000.00 0.00 Implementati 2020-01-25 2020-01-30 2020-02-29 2020-03-30 2020-04-27 2020-10-24 Portable RAMAN Spectroscopy Envelope Nepal on (Hand held) equipments NIRTTP/PCO/DOC/G/NCB- Strengthen Trade-Related Pending 114 / Supply and delivery of Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 85,000.00 0.00 Implementati 2020-01-24 2020-01-29 2020-03-11 2020-04-10 2020-05-15 2020-11-11 Portable XRF (Hand hel) Envelope Nepal on equipments NIRTTP/PCO/DOTM/G/NCB- 117 / Procurement of Modernize transport and Pending Single Stage - One Hardware for GPS-Vehicle IDA / H8630 transit arrangements between Post Request for Bids Open - National 420,000.00 0.00 Implementati 2020-03-25 2020-04-01 2020-05-01 2020-05-16 2020-05-30 2020-07-14 Envelope Tracking System for Public Nepal and India on Buses NIRTTP/PCO/G/SHP-119 / Strengthen Trade-Related Request for Single Stage - One Supply and delivery of the IDA / H8630 Institutional Capacity in Post Limited 20,000.00 13,843.10 Completed 2020-02-24 2020-05-29 2020-03-15 2020-06-21 2020-03-30 2020-07-07 Quotations Envelope office furniture Nepal NIRTTP/PCO/G/SHP-118 / Supply and deliver of Strengthen Trade-Related Pending Request for Single Stage - One Machinery Equipment IDA / H8630 Institutional Capacity in Post Limited 24,000.00 0.00 Implementati 2020-03-09 2020-04-21 2020-05-21 Quotations Envelope (Desktop, Laptops, Printers Nepal on etc) NIRTTP/PCO/G/DIR- 84 / Strengthen Trade-Related Supply and delivery of four IDA / H8630 Institutional Capacity in Post Direct Selection Direct 52,000.00 0.00 Canceled 2020-11-27 2020-12-04 2021-01-09 2021-02-08 wheel Jeep with five doors for Nepal PCO NIRTTP/PCO/G/DIR-85 / Strengthen Trade-Related Supply and delivery of double IDA / H8630 Institutional Capacity in Post Direct Selection Direct 37,000.00 0.00 Canceled 2020-11-27 2020-12-04 2021-01-01 2021-03-02 cab pickup for SPS laboratory Nepal NIRTTP/PCO/G/DIR-86 / Strengthen Trade-Related Supply and delivery of two IDA / H8630 Institutional Capacity in Post Direct Selection Direct 69,000.00 0.00 Canceled 2020-11-27 2020-12-04 2021-01-08 2021-02-07 Cars for PCO Nepal NIRTTP/PCO/G/DIR-87 / Strengthen Trade-Related Supply and delivery of Two IDA / H8630 Institutional Capacity in Post Direct Selection Direct 7,000.00 0.00 Canceled 2020-11-27 2020-12-04 2021-01-08 2021-02-07 motorbike for PCO Nepal NIRTTP/PCO/G/DIR-88 / Strengthen Trade-Related Supply and deliver of Two IDA / H8630 Institutional Capacity in Post Direct Selection Direct 5,000.00 0.00 Canceled 2020-11-27 2020-12-04 2021-01-09 2021-02-08 Scooters for PCO Nepal NIRTTP/PCO/MOALD/G/RFQ- 89 / Supply and delivery of Strengthen Trade-Related Pending Desktop computer, High-End Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Limited 22,000.00 0.00 Implementati 2020-12-06 2021-01-25 2021-03-26 series labtop and Heavy duty Quotations Envelope Nepal on photocopy machine for SPS Laboratory. NIRTTP/PCO/G/RFQ-90 / Strengthen Trade-Related Pending Request for Single Stage - One Supply and delivery of IDA / H8630 Institutional Capacity in Post Limited 4,000.00 0.00 Implementati 2020-12-06 2021-01-25 2021-03-26 Quotations Envelope Desktop Computer for PCO. Nepal on NIRTTP/PCO/G/RFQ-91 / Strengthen Trade-Related Pending Request for Single Stage - One Supply and delivery of laptop IDA / H8630 Institutional Capacity in Post Limited 4,000.00 0.00 Implementati 2020-12-06 2021-01-24 2021-03-25 Quotations Envelope for PCO Nepal on NIRTTP/PCO/G/RFQ-92 / Strengthen Trade-Related Pending Supply and delivery of Printer, Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Limited 4,000.00 0.00 Implementati 2020-12-07 2021-01-25 2021-02-24 scanner Or Other office Quotations Envelope Nepal on equipment for PCO NIRTTP/PCO/DOC/G/NCB- 121 / Supply, installation and Strengthen Trade-Related commissioning of Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 34,500.00 0.00 Canceled 2021-01-26 2021-01-26 2021-02-25 2021-03-27 2021-04-18 2021-05-18 Accessories Equipment for Envelope Nepal upgrading of Data Center In Department of Customs Page 3 NIRTTP/PCO/MOALD/G/NCB- 122 / Supply, delivery and Strengthen Trade-Related installation all lab. furniture IDA / H8630 Institutional Capacity in Post Request for Bids 137,000.00 0.00 Canceled 2021-02-02 2021-03-05 2021-02-02 2021-03-04 2021-04-04 2021-04-03 2021-05-31 2021-04-25 2021-10-22 and office furniture for SPS Nepal laboratory NIRTTP/PCO/DOTM/G-123 / Supply and delivery Server, Strengthen Trade-Related Pending Single Stage - One Computers GPS devices and IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 320,000.00 0.00 Implementati 2021-02-24 2021-02-24 2021-03-26 2021-04-25 2021-05-24 2021-07-08 Envelope accessories for GPS Vehicle Nepal on tracking System NIRTTP/PCO/G/NCB-124 / Strengthen Trade-Related Under Supply and delivery of four Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 52,000.00 0.00 Implementati 2021-03-14 2021-03-26 2021-03-14 2021-04-13 2021-05-13 2021-06-04 2021-07-04 wheel Jeep with five doors for Envelope Nepal on PCO NIRTTP/PCO/G/NCB-125 / Strengthen Trade-Related Under Single Stage - One Supply and delivery of double IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 37,000.00 0.00 Implementati 2021-03-14 2021-03-26 2021-03-14 2021-04-13 2021-05-13 2021-06-11 2021-07-06 Envelope cab pickup for SPS laboratory Nepal on NIRTTP/PCO/G/NCB-127 / Strengthen Trade-Related Under Supply and delivery of two Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 12,000.00 0.00 Implementati 2021-03-14 2021-03-26 2021-03-14 2021-04-13 2021-05-13 2021-06-04 2021-07-04 Bikes and two Scooters for Envelope Nepal on PCO NIRTTP/PCO/DOC/G/RFQ- 133 / Supply and delivery of Strengthen Trade-Related Pending Request for Single Stage - One IT Equipment and accessories IDA / H8630 Institutional Capacity in Post Limited 6,000.00 0.00 Implementati 2021-04-30 2021-05-24 2021-06-08 Quotations Envelope (Air conditioner , Camera etc) Nepal on for NNSW PIU Office NIRTTP/PCO/DOC/G/RFQ- 134 / Supply and Delivery of Strengthen Trade-Related Pending Request for Single Stage - One IT Equipment and IDA / H8630 Institutional Capacity in Post Limited 3,000.00 0.00 Implementati 2021-04-29 2021-05-23 2021-06-22 Quotations Envelope accessories(Projector, Tablet, Nepal on Fan ) for NNSW PIU Office NIRTTP/PCO/DOC/G/RFQ / Supply,delivery and Strengthen Trade-Related Pending commissioning of accessories Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Limited 25,000.00 0.00 Implementati 2021-05-16 2021-06-16 2021-07-01 equipment for upgrading Data Quotations Envelope Nepal on Centre in Department of Customs. NIRTTP/PCO/G/NCB-126 / Strengthen Trade-Related Single Stage - One Supply and delivery of two IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 69,000.00 0.00 Canceled 2021-03-14 2021-03-26 2021-03-14 2021-04-13 2021-04-26 2021-05-13 2021-04-26 2021-06-04 2021-07-04 Envelope Cars for PCO Nepal NIRTTP/PCO/G/DIR-126 / Strengthen Trade-Related Pending Supply and delivery of two IDA / H8630 Institutional Capacity in Post Direct Selection Direct 69,000.00 0.00 Implementati 2021-05-24 2021-05-29 2021-06-11 2021-06-26 cars for PCO Nepal on NIRTTP/PCO/MOALD/G/NCB- 122-2 / Supply, delivery and Strengthen Trade-Related Pending Single Stage - One installation of all lab. furniture IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 137,000.00 0.00 Implementati 2021-06-03 2021-06-03 2021-07-03 2021-08-02 2021-08-31 2021-11-29 Envelope and office furniture for SPS Nepal on Laboratory. NIRTTP/PCO/MOALD/G /NCB- Strengthen Trade-Related 128 / Supply and delivery of Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 210,000.00 0.00 Canceled 2021-04-18 2021-04-21 2021-05-21 2021-06-20 2021-07-18 2021-10-16 Laboratory Equipment of Envelope Nepal Package A for SPS Laboratory NIRTTP/PCO/MOALD/G/NCB- Strengthen Trade-Related 129 / Supply and delivery of Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 107,000.00 0.00 Canceled 2021-04-18 2021-04-21 2021-05-21 2021-06-20 2021-07-18 2021-10-16 Laboratory Equipment of Envelope Nepal Package B for SPS Laboratory NIRTTP/PCO/MOALD/G/NCB- Strengthen Trade-Related 130 / Supply and delivery of Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 260,000.00 0.00 Canceled 2021-04-18 2021-04-21 2021-05-21 2021-06-20 2021-07-18 2021-10-16 Laboratory Equipment of Envelope Nepal Package C for SPS Laboratory NIRTTP/PCO/MOALD/G/NCB- Strengthen Trade-Related 131 / Supply and delivery of Single Stage - One IDA / H8630 Institutional Capacity in Post Request for Bids Open - National 164,000.00 0.00 Canceled 2021-04-18 2021-04-21 2021-05-21 2021-06-20 2021-07-18 2021-10-16 Laboratory Equipment of Envelope Nepal Package D for SPS-Laboratory NIRTTP/PCO/MOALD/G/NCB- Strengthen Trade-Related Under (132.1TO-132.10) / Supply Single Stage - One IDA / 52730 Institutional Capacity in Post Request for Bids Open - National 667,500.00 0.00 Implementati 2021-06-13 2021-06-15 2021-06-13 2021-07-13 2021-08-12 2021-09-10 2021-11-24 and delivery of Laboratory Envelope Nepal on Equipment for SPS- Laboratory NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NIRTTP/PCO/NS/SHP-26 / Computer software design, Modernize transport and Pending Request for installation helpful in / transit arrangements between Post Limited - National 5,700.00 0.00 Implementati 2016-11-10 2016-11-19 2017-07-05 Quotations improvement of operation and Nepal and India on management of the Project NIRTTP/PCO/DOTM/NS/SHP- Modernize transport and Pending 33 / Selection & Recruitment / transit arrangements between Post Request for Bids Open - National 24,000.00 0.00 Implementati 1901-01-01 2015-05-15 1901-01-01 1901-01-01 2015-06-28 2019-06-30 of Office Secretay Nepal and India on NIRTTP/PCO/DOTM/NS/NCB- 35 / Developing web based Road Accident Management Modernize transport and Pending Information System (RAMIS) / transit arrangements between Post Direct Selection National 40,000.00 0.00 Implementati 2016-01-20 2016-07-15 and piloting in Kathmandu Nepal and India on valley and along the Birgunj- Kathmandu corridor Page 4 NIRTTP/PCO/NS/NCB-29 / Kolkata-Kathmandu Corridor Modernize transport and Monitoring and Evaluation / transit arrangements between Post Request for Bids Open - National 278,000.00 0.00 Canceled 2016-01-07 2016-01-11 2016-02-10 2016-02-21 2016-03-04 2016-12-30 Data Management System Nepal and India (CMEDMS) NIRTTP/PCO/TEPC/NS/SHP- Strengthen Trade-Related Pending 34 / Selection & Recruitment Request for Single Stage - One IDA / H8630 Institutional Capacity in Post Open - National 24,000.00 0.00 Implementati 2017-09-17 2017-11-12 2019-12-31 of Office Secretay for TEPC, Quotations Envelope Nepal on Number -1 NIRTTP/PCO/NITDB/NS/SHP- 37 / Procurement of firm for Determination of Border crossing and transportation Pending Improve Select Trade-Related Request for Single Stage - One time of Cargo.(Originating at IDA / 52730 Post Open - National 10,000.00 0.00 Implementati 2017-09-22 2017-11-17 2018-05-16 Infrastructure Quotations Envelope Kolkata to reach Kathmandu on and vice versa for the both Road and Railway mode of transportation) NP-MOC-23661-NC-RFB / Procurement of Design, Supply and Build National Single Window IT system in Strengthen Trade-Related Single Stage - Two Nepal ( Previous ID as per IDA / H8630 Institutional Capacity in Prior Request for Bids Open - International 12,780,000.00 7,608,077.56 Signed 2017-08-03 2017-10-19 2017-10-19 2018-01-17 2017-08-08 2017-12-28 2018-03-21 2018-03-12 2019-03-21 2018-04-16 2019-06-25 2019-10-08 Envelope approved PP 2017-01 is Nepal NIRTTP-MOCS-87-LPI-S- NIRTTP/PCO/DOC/NS/ICB- 1(Two stage bidding) NIRTTP/PCO/NITDB/SHP-65 / Border Crossing & Under Improve Select Trade-Related Request for Single Stage - One Transportation time of cargo IDA / 52730 Post Open - National 22,000.00 0.00 Implementati 2018-06-06 2018-06-13 2018-08-01 2018-09-30 Infrastructure Quotations Envelope (Raxaul-Birgunj-Kathmandu- on Birgunj) NIRTTP/PCO/DOTM/NS/DIR- 57 / Technical support for Modernize transport and maintenance of Vehicle IDA / 52730 transit arrangements between Post Direct Selection Direct 50,000.00 0.00 Canceled 2018-03-01 2017-12-17 2018-03-06 2018-04-10 2018-10-07 Fitness Testing Center(VFTC) Nepal and India and capacity Buildings of staffs NIRTTP/PCO/NS/SHP-31 / Modernize transport and Selection and Recruitment of / transit arrangements between Post Request for Bids Open - National 196,800.00 0.00 Canceled 1901-01-01 2015-10-02 1901-01-01 1901-01-01 2015-10-31 2019-12-31 Assistants for PCO Nepal and India NIRTTP/PCO/PPD/NS/SHP-38 Modernize transport and / Developmentof National Request for / transit arrangements between Post Limited - National 18,500.00 0.00 Canceled 2016-11-05 2016-11-14 2016-11-14 Pest Surveillance Management Quotations Nepal and India Information System NIRTTP/PCO/DOC/NS/SHP- Modernize transport and 32 / Selection & Recruitment / transit arrangements between Post Request for Bids Open - National 24,000.00 0.00 Canceled 1901-01-01 2015-05-15 1901-01-01 1901-01-01 2015-06-28 2019-06-30 of Office Secretay Nepal and India NIRTTP/PCO/DOC/NS/SHP- Strengthen Trade-Related Pending Request for Single Stage - One 94 / Internet Service for NNSW IDA / H8630 Institutional Capacity in Post Limited 1,200.00 0.00 Implementati 2019-08-16 2019-09-13 2020-09-12 Quotations Envelope PIU Office Nepal on NIRTTP/PCO/DOC/NS/SHP- Strengthen Trade-Related Pending Request for Single Stage - One 100 / Recruitment of IDA / H8630 Institutional Capacity in Post Open - National 7,200.00 0.00 Implementati 2019-08-25 2019-10-20 2021-09-19 Quotations Envelope Computer Operator for NNSW Nepal on NIRTTP/PCO/DOC/NS/SHP- Strengthen Trade-Related Pending Request for Single Stage - One 101 / Recruitment of Project IDA / H8630 Institutional Capacity in Post Open - National 7,200.00 0.00 Implementati 2019-08-25 2019-10-20 2021-09-19 Quotations Envelope Assistant for NNSW Nepal on NIRTTP/PCO/DOC/NS/SHP- Strengthen Trade-Related Pending Request for Single Stage - One 102 / Recruitment of Office IDA / H8630 Institutional Capacity in Post Open - National 6,000.00 0.00 Implementati 2019-08-25 2019-10-20 2021-09-19 Quotations Envelope Assistance for NNSW Nepal on NIRTTP/PCO/DOC/NS/SHP- Strengthen Trade-Related Pending Request for Single Stage - One 103 / Recruitment of Driver IDA / H8630 Institutional Capacity in Post Open - National 6,000.00 0.00 Implementati 2019-08-25 2019-10-20 2021-09-19 Quotations Envelope for NNSW Nepal on NP-MOC-134402-NC-RFQ / Modernize transport and Pending Request for Single Stage - One Internet Connection for RAIMS IDA / H8630 transit arrangements between Post Open - National 11,000.00 0.00 Implementati 2019-09-30 2019-12-03 2019-12-18 Quotations Envelope Stations Nepal and India on NP-MOC-134403-NC-RFQ / Modernize transport and Pending Request for Single Stage - One License for Core Router IDA / H8630 transit arrangements between Post Open - National 6,000.00 0.00 Implementati 2019-10-02 2019-11-21 2019-11-28 Quotations Envelope Firewall for RAIMS Nepal and India on NP-MOC-134404-NC-RFQ / Modernize transport and Pending Request for Single Stage - One License for Web Application IDA / H8630 transit arrangements between Post Open - National 20,000.00 0.00 Implementati 2019-09-30 2019-11-19 2019-11-26 Quotations Envelope Firewall Nepal and India on NP-MOC-134405-NC-RFQ / Modernize transport and Pending Request for Single Stage - One Secure Sockets Layer IDA / H8630 transit arrangements between Post Open - National 1,000.00 0.00 Implementati 2019-10-02 2019-11-21 2019-11-28 Quotations Envelope Certificate for RAIMS Nepal and India on NP-MOC-134407-NC-RFQ / Modernize transport and Pending Request for Single Stage - One Windows Server 2019 IDA / H8630 transit arrangements between Post Open - National 5,000.00 0.00 Implementati 2019-10-02 2019-11-21 2019-11-28 Quotations Envelope Standard License Nepal and India on NIRTTP/PCO/DOTM/NC/RFQ- Modernize transport and Pending 44 / Procurement of internet Request for Single Stage - One IDA / H8630 transit arrangements between Post Limited 10,500.00 0.00 Implementati 2021-01-27 2021-02-20 2021-03-07 connection for RA-IMS Quotations Envelope Nepal and India on operation NIRTTP/PCO/DOC/NS/RFQ- 121 / Provide and Connect Strengthen Trade-Related Pending Request for Single Stage - One fast Internet and Zoom service IDA / H8630 Institutional Capacity in Post Limited 2,100.00 0.00 Implementati 2021-06-24 2021-07-26 2021-11-23 Quotations Envelope in PIU for Virtual Training Nepal on Program. CONSULTING FIRMS Page 5 Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NIRTTP-DOR-S-QCBS-1 / Consulting services for Modernize transport and Quality And Cost- Feasibility study, Detailed IDA / 52730 transit arrangements between Prior Open - International 0.00 3,181,587.36 Signed 2015-06-25 2015-07-05 Based Selection design & Constr. supervision Nepal and India of various Roads NIRTTP/PCO/NITDB/S/QCBS- 23 / Design and Construction Improve Select Trade-Related Quality And Cost- Under IDA / H8630 Post Open - National 191,700.00 0.00 2015-10-12 2015-12-24 2016-01-15 2016-02-05 2017-02-05 Supervision of Railway Tracks Infrastructure Based Selection Implementation Modification at BirgunjICD NIRTTP/PCO/NITDB/S/QCBS- 46 / Detailed Design Review Improve Select Trade-Related Quality And Cost- Under and Supervision Consultant IDA / H8630 Post Open - International 350,000.00 0.00 2016-11-16 2017-01-31 2017-02-14 2018-06-01 2017-02-21 2019-06-30 Infrastructure Based Selection Implementation for Construction of ICD, Kathmandu NIRTTP/PCO/DOTM/S/LCS- 47 / Consulting Servieces to Modernize transport and support DOTM for bus routes, Least Cost Under IDA / 52730 transit arrangements between Post Open - National 75,000.00 0.00 2016-11-25 2017-03-01 2017-03-10 2017-03-31 2017-06-30 vehicle standard survey and Selection Implementation Nepal and India for preparing standard criteria for route permits NIRTTP/PCO/DOTM/S/CQS- Modernize transport and Quality And Cost- Under 48 / Survey and Detailed IDA / 52730 transit arrangements between Post Open - National 40,000.00 0.00 2018-08-30 2017-03-17 2017-05-25 2017-05-30 2017-06-02 2017-12-01 Based Selection Implementation Design Weigh Bridge Stations Nepal and India NIRTTP/PCO/S/CQS-52 / Modernize transport and Consultant Feasibility Study for FTA with Pending / transit arrangements between Post Qualification Open - National 18,500.00 0.00 2016-11-17 2017-01-02 2017-07-01 a Country considering long Implementation Nepal and India Selection term trade benefit to Nepal NIRTTP/PCO/DOC/S/QCBS-9 / Selection of Firm for Nepal National Single Window and Trade Portal Strengthen Trade-Related Quality And Cost- Implementation"Quality IDA / 52730 Institutional Capacity in Prior Open - International 1,930,000.00 1,636,533.58 Signed 2014-06-25 2014-10-20 2014-11-02 2015-06-09 2014-11-30 2015-06-18 2017-11-30 Based Selection Assurance and Advisory Nepal Services(including Bid document prepartion)(International) NIRTTP/PCO/NITB/S/QCBS- 17 / Selection of Project Modernize transport and Implementation/Supervision Quality And Cost- IDA / 52730 transit arrangements between Prior Open - National 228,735.63 240,862.34 Signed 2013-11-29 2014-05-15 2014-06-21 2014-07-07 2014-07-14 2014-07-07 2016-01-07 Consultant for NITDB (Birgunj Based Selection Nepal and India and Bhairahawa ICD Improvement works) NP-MOC-23665-CS-CQS-40 / Selection of firm for preparing Master Plan and Strengthen Trade-Related Consultant Detailed Design/Drawing of Pending IDA / H8630 Institutional Capacity in Post Qualification Open - National 65,000.00 0.00 2017-08-03 2017-08-24 2017-10-07 2017-11-06 2017-12-11 2018-06-09 Referral/SPS and Regional Implementation Nepal Selection Plant Protection Laboratory including Supervision of Constriction Works NITDB/PCO/PPD/S/QCBS-45 / Consulting Services for Pest Modernize transport and Quality And Cost- Surveillance in six major crops / transit arrangements between Post Open - National 124,000.00 0.00 Canceled 2016-11-11 2017-01-10 2017-01-10 2017-02-12 2017-07-12 Based Selection and Pest Detection Survey in Nepal and India three major medicinal Herbs NIRTTP/PCO/TEPC/S/QCBS- 39 / Selection of Firm for Strengthen Trade-Related Quality And Cost- Pending Development and IDA / H8630 Institutional Capacity in Post Open - International 570,000.00 0.00 2017-08-03 2017-08-24 2017-10-07 2017-11-04 2017-12-04 2018-01-08 2018-02-12 2019-02-12 Based Selection Implementation Implementation of the Nepal Nepal Trade Information Portal NIRTTP/PCO/DOTM/S/LCS- 26 / Consulting Servieces to Modernize transport and support DOTM for bus routes, Least Cost Under IDA / H8630 transit arrangements between Post Open - National 35,000.00 0.00 2017-09-12 2016-05-05 2017-10-03 2017-11-16 2017-12-14 2018-01-13 2018-02-17 2018-03-24 2018-09-20 vehicle standard survey and Selection Implementation Nepal and India for preparing standard criteria for route permits NIRTTP/PCO/NITDB/S/QCBS- 24 / Survey Environmental Improve Select Trade-Related Quality And Cost- Pending IDA / 52730 Post Open - National 240,000.00 0.00 2017-09-11 2017-10-02 2017-11-15 2017-12-13 2018-01-12 2018-02-16 2018-03-23 2019-03-23 Study and Detailed Design for Infrastructure Based Selection Implementation Kathmandu CFS/ICD NIRTTP/PCO/S/CQS-56 / Consultant's services for a comprehensive study of Nepal's existing transit Strengthen Trade-Related Consultant Pending agreements with India, IDA / H8630 Institutional Capacity in Post Qualification Open - National 30,000.00 0.00 2017-09-17 2017-10-08 2017-11-21 2017-12-21 2018-01-25 2018-07-24 Implementation Bangladesh and China and Nepal Selection receive recommendations for amendments and improvements NIRTTP/PCO/S/CQS-57 / Consultant's services for a comprehensive study on the Strengthen Trade-Related Consultant Pending potentiality of trade-in- IDA / H8630 Institutional Capacity in Post Qualification Open - National 30,000.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 Implementation services with SAARC countries Nepal Selection to develop Nepal's service trade NIRTTP/PCO/NITDB/S/CQS- Consultant 21 / Data Capture Framework Improve Select Trade-Related Pending IDA / 52730 Post Qualification Open - National 22,000.00 0.00 2017-09-17 2017-10-08 2017-11-21 2017-12-21 2018-01-25 2018-07-24 For Kolkata-Kathmandu Infrastructure Implementation Selection Corridor Monitoring NIRTTP/PCO/S/CQS-53 / Preparation of Mid-term and Modernize transport and Consultant Long-term Strategy Plan for / transit arrangements between Post Qualification Open - National 37,000.00 0.00 Canceled 2016-11-17 2017-01-02 2017-07-01 Trade sector including Nepal and India Selection infrastructure Page 6 NIRTTP/PCO/S/CQS-73 / Strengthen Trade-Related Consultant Study on Possibilities of Pending IDA / H8630 Institutional Capacity in Post Qualification Open - National 40,000.00 0.00 2018-12-01 2018-12-22 2019-02-04 2019-03-06 2019-04-10 2019-10-07 Transit Trade Facility through Implementation Nepal Selection Inland Water Wages NP-MOC-23681-CS-CQS-45- PPD / Consulting Services for Strengthen Trade-Related Consultant Pest Surveillance in six major IDA / H8630 Institutional Capacity in Post Qualification Open - National 124,000.00 0.00 Canceled 2017-08-04 2017-08-25 2017-10-08 2017-11-07 2017-12-12 2018-06-10 crops and Pest Detection Nepal Selection Survey in three major medicinal Herbs NIRTTP/PCO/NITDB/S/QCBS -55 / Design, Development and Operation of Corridor Improve Select Trade-Related Quality And Cost- Pending IDA / H8630 Post Open - National 278,000.00 0.00 2017-08-27 2017-09-17 2017-10-31 2017-11-28 2017-12-28 2018-02-01 2018-03-08 2020-03-07 Monitoring and Evaluation Infrastructure Based Selection Implementation Data Management System (CMEDMS) NIRTTP/PCO/DOTM/S/LCS- Modernize transport and 78 / Consulting service for Least Cost Pending IDA / H8630 transit arrangements between Post Open - National 40,000.00 0.00 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-26 2019-10-23 "Construction Supervision of Selection Implementation Nepal and India weighbridge station " NIRTTP/PCO/DOTM/S/QCBS- 115 / Procurement of System Modernize transport and Quality And Cost- Under Development consultant for IDA / H8630 transit arrangements between Post Open - National 150,000.00 0.00 2020-01-20 2020-01-29 2020-02-04 2020-02-16 2020-02-21 2020-03-20 2020-04-04 2020-04-18 2020-05-02 2021-05-02 Based Selection Implementation GPS-Vehicle tracking system Nepal and India for Public buses NIRTTP/PCO/DOTM/S /CQS- 127 / Procurement of Strengthen Trade-Related Consultant Under Consultant for speed limit IDA / H8630 Institutional Capacity in Post Qualification Open - National 13,000.00 0.00 2020-11-23 2020-11-23 2020-11-30 2020-12-21 2020-12-28 2021-01-18 2021-07-17 Implementation study for pilot routes for GPS- Nepal Selection Vehicle Tracking System NIRTTP/PCO/NITDB/S/CQS- 112 / Pre-feasibility study Strengthen Trade-Related Consultant potential ICD/CFS at IDA / H8630 Institutional Capacity in Post Qualification Open - National 90,000.00 0.00 Under Review 2021-06-23 2021-06-24 2021-06-23 2021-07-14 2021-08-13 2021-09-04 2021-11-18 Hilsa/Yari, Olangchung Gola, Nepal Selection Kimanthanka and in Gandaki Province INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Modernize transport and Individual NIRTTP/PCO/S/IND-28 / IDA / 52730 transit arrangements between Prior Consultant Open 0.00 119,603.22 Canceled 2015-09-01 Technical Adviser to NITDB Nepal and India Selection NIRTTP/PCO/S/IND-19 / Modernize transport and Individual Selection of Expert for Study IDA / 52730 transit arrangements between Prior Consultant Limited 30,000.00 30,000.00 Signed 2014-07-10 2014-03-31 2014-07-04 2015-01-03 on Transshipment Nepal and India Selection NIRTTP/PCO/S/IND-27 / Modernize transport and Individual Selection of full time IDA / 52730 transit arrangements between Prior Consultant Limited 100,000.00 57,532.13 Signed 2015-09-16 2015-06-05 2015-09-17 2019-06-30 Procurement Nepal and India Selection Specialist/Consultant NIRTTP/PCO/S/IND-28 / Strengthen Trade-Related Individual Selection of Technical Adviser IDA / 52730 Institutional Capacity in Prior Consultant Limited 110,000.00 83,757.40 Signed 2015-11-26 2015-11-05 2015-12-09 2019-12-31 for NITDB Nepal Selection NIRTTP/PCO/DOTM/S/IND- Modernize transport and Individual 29 / Selection of Technical IDA / 52730 transit arrangements between Prior Consultant Limited 100,000.00 45,313.41 Signed 2015-12-28 2015-11-05 2015-12-31 2019-12-31 Adviser for DoTM (National) Nepal and India Selection NIRTTP/PCO/S/IND-30 / Modernize transport and Individual Selection of Trade Facilitation IDA / 52730 transit arrangements between Prior Consultant Limited 100,000.00 97,117.14 Signed 2015-09-23 2015-06-30 2015-09-23 2019-12-31 Adviser (National) Nepal and India Selection NIRTTP/PCO/S/IND-31 / Modernize transport and Individual Selection of Trade IDA / 52730 transit arrangements between Prior Consultant Limited 100,000.00 101,175.24 Signed 2015-09-01 2015-06-30 2015-09-14 2019-12-31 Development Adviser for PCO Nepal and India Selection NIRTTP/PCO/PPD/S/IND-44 / Strengthen Trade-Related Individual Selection of Expert for Under IDA / H8630 Institutional Capacity in Post Consultant Limited 23,500.00 17,800.00 2016-12-12 2016-12-12 updating National Phyto- Implementation Nepal Selection Sanitary System of Nepal NIRTTP/PCO/PPD/S/IND-43 / Selection of Expert for Plant Modernize transport and Individual Pending Health Management study / transit arrangements between Post Consultant Limited 9,500.00 0.00 2016-12-12 2016-12-12 Implementation based on Traditional Nepal and India Selection Transborder Trade NIRTTP/PCO/S/IND-49 / Modernize transport and Individual Selection of Non Tariff Pending / transit arrangements between Post Consultant Limited 70,000.00 0.00 2016-12-15 2019-06-30 Measures (NTM) Tracking Implementation Nepal and India Selection System Analyst NIRTTP/PCO/S/IND-50 / Modernize transport and Individual Selection of Consultant for Pending / transit arrangements between Post Consultant Limited 18,500.00 0.00 2016-12-04 2016-12-04 study on Improvement of Implementation Nepal and India Selection Nepal-India Trading Regime NIRTTP/PCO/DOC/S/IND-50 / Selection of an International Strengthen Trade-Related Individual Procurement IDA / 52730 Institutional Capacity in Prior Consultant Limited 50,000.00 0.00 Canceled 2017-01-16 2017-07-15 Specialist/Consultant Nepal Selection (Intermittent) NIRTTP/PCO/DOC/S/IND-51 Strengthen Trade-Related Individual / Selection of an International IDA / 52730 Institutional Capacity in Post Consultant Limited 50,000.00 0.00 Canceled 2017-01-16 2017-07-15 IT Specialist/Consultant Nepal Selection (Intermittent) Page 7 NIRTTP/PCO/S/IND-52 / Strengthen Trade-Related Individual Selection of full time Under IDA / H8630 Institutional Capacity in Prior Consultant Limited 87,000.00 0.00 2017-01-18 2019-12-31 Procurement Implementation Nepal Selection Adviser/Consultant NIRTTP/PCO/S/IND-11 / Modernize transport and Individual Selection of full time IDA / 52730 transit arrangements between Prior Consultant Limited 18,045.98 21,496.57 Signed 2014-03-14 1901-01-01 2014-02-18 2014-07-15 Procurement Nepal and India Selection Specialist/Consultant NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual Under 18 / Selection of Engineering IDA / 52730 Institutional Capacity in Post Consultant Limited 17,241.38 0.00 2015-12-04 2019-12-31 Implementation Support to NITDB Nepal Selection NIRTTP/PCO/S/IND-13 / Strengthen Trade-Related Individual Selection of Environmental Pending IDA / H8630 Institutional Capacity in Post Consultant Open 40,000.00 0.00 2017-09-12 2017-10-31 2017-11-21 2017-12-26 2019-12-31 Safeguards Specialist Implementation Nepal Selection (Intermittent) NIRTTP/PCO/S/IND-14 / Strengthen Trade-Related Individual Pending Selection of Social Safeguards IDA / H8630 Institutional Capacity in Post Consultant Open 35,000.00 0.00 2017-09-12 2017-10-31 2017-11-21 2017-12-26 2018-06-24 Implementation Specialist (Intermittent) Nepal Selection NIRTTP/PCO/S/IND-58 / Consultanting service for the Strengthen Trade-Related Individual development of a system on Pending IDA / H8630 Institutional Capacity in Post Consultant Open 40,000.00 0.00 2018-03-01 2018-04-19 2018-05-10 2018-06-14 2018-12-11 Non-Tariff Measures of major Implementation Nepal Selection export markets for export promotion measures in Nepal NIRTTP/PCO/DOTM/IND-4 / Modernize transport and Individual Pending Selection of Project Assistant IDA / H8630 transit arrangements between Post Consultant Open 50,000.00 0.00 2017-09-17 2017-11-05 2017-11-26 2017-12-31 2019-12-31 Implementation for DOTM (National) Nepal and India Selection NIRTTP/PCO/NITDB/S/SSS- Improve Select Trade-Related Under 42 / Selection of Corridor IDA / 52730 Post Direct Selection Direct 3,000.00 2,698.86 2017-09-17 2017-09-27 2017-12-01 2018-05-30 Infrastructure Implementation Monitoring Consultant NIRTTP/PCO/PPD/S/IND-59 / Strengthen Trade-Related Individual Consultant for preparation of Pending IDA / H8630 Institutional Capacity in Post Consultant Open 20,000.00 0.00 2018-02-28 2018-04-18 2018-05-09 2018-06-13 2018-09-11 pest surveillance of 100 pests Implementation Nepal Selection of 10 major crops NITTP/PCO/PPD/S/IND-60 / Strengthen Trade-Related Individual Preparation of Internal Pending IDA / H8630 Institutional Capacity in Post Consultant Open 15,000.00 0.00 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-07-15 Quarantine Procedure and Implementation Nepal Selection Guideline NIRTTP/PCO/S/IND-54 / Preparation of Mid-term and Strengthen Trade-Related Individual Pending long-term strategy plan for IDA / H8630 Institutional Capacity in Post Consultant Open 50,000.00 0.00 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2018-08-13 Implementation trade sector including Nepal Selection infrastructure NIRTTP/PCO/DOTM/S/IND- Strengthen Trade-Related Individual 56 / Selection of Technical IDA / 52730 Institutional Capacity in Prior Consultant Open 50,000.00 56,815.29 Signed 2018-01-01 2018-02-19 2017-12-31 2018-03-12 2018-01-04 2018-04-16 2018-01-05 2019-12-31 Adviser for DoTM (National) Nepal Selection NIRTTP/PCO/PPD/IND-61 / Civil Engineer( Intermittent) Strengthen Trade-Related Individual Pending For supervision of IDA / H8630 Institutional Capacity in Post Consultant Open 16,000.00 0.00 2018-05-01 2018-06-19 2018-07-10 2018-08-14 2019-02-10 Implementation Construction work under Nepal Selection NIRTTP project NIRTTP/PCO/DOTM/S/IND- 54 / Selection of an Modernize transport and Individual International Consultant to Under IDA / H8630 transit arrangements between Post Consultant Limited 25,000.00 0.00 2018-08-08 2018-08-12 2018-10-15 2018-10-30 2019-04-30 2019-09-30 Support Establishment and Implementation Nepal and India Selection Operation of Vehicle Fitness Testing Center in Nepal NIRTTP/PCO/S/IND-74 / Strengthen Trade-Related Individual Pending Study on Possibility of Service IDA / H8630 Institutional Capacity in Post Consultant Open 30,000.00 0.00 2018-09-02 2018-10-21 2018-11-11 2018-12-16 2019-06-14 Implementation trade with SAARC countires Nepal Selection NIRTTP/PCO/S/IND-34 / Modernize transport and Individual Selection of MoCS Capacity / transit arrangements between Post Consultant Limited 110,000.00 0.00 Canceled 2015-10-30 2019-12-31 Enhancement Specialist Nepal and India Selection (National) NIRTTP/PCO/S/IND-15 / Modernize transport and Individual Selection of Finance / transit arrangements between Post Consultant Limited 18,045.98 0.00 Canceled 2015-11-15 2019-12-31 Specialist/Consultant Nepal and India Selection NIRTTP/PCO/DOC/S/IND-26 / Selection of Legal Adviser Modernize transport and Individual for Dept. of Customs for / transit arrangements between Prior Consultant Limited 1,700.00 0.00 Canceled 2015-11-30 2019-06-30 advice on the proposed Single Nepal and India Selection Window System NIRTTP/PCO/S/IND-53 / Selection of Senior Modernize transport and Individual Procurement / transit arrangements between Prior Consultant Limited 22,500.00 0.00 Canceled 2017-01-31 2019-06-30 Specialist/Consultant Nepal and India Selection (Intermittent) NIRTTP/PCO/S/IND-51 / Selection of Consultant for Modernize transport and Individual study on Requirements of / transit arrangements between Post Consultant Limited 18,500.00 0.00 Canceled 2016-12-04 2016-12-04 Additional Facility in Birgunj Nepal and India Selection Integrated Check Point (ICP) NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual Under 67 / Social Safeguard IDA / H8630 Institutional Capacity in Post Consultant Open 15,000.00 0.00 2018-12-01 2019-01-22 2019-01-19 2019-02-09 2019-03-16 2020-01-30 Implementation Mobiliser Nepal Selection Page 8 NIRTTP/PCO/S/IND-68 / Study on reorganizing the Nepal Transit and Strengthen Trade-Related Individual Under Waterhousing Company IDA / H8630 Institutional Capacity in Post Consultant Open 7,000.00 0.00 2018-12-31 2019-02-18 2019-03-11 2019-04-15 2019-06-14 Implementation Limited (NTWCL) and the Nepal Selection Nepal Inter-modal transport Development Board(NITDB) NIRTTP/PCO/TEPC/S/IND-69 / Project Management Advisor Strengthen Trade-Related Individual for Quality Assurance and Under IDA / H8630 Institutional Capacity in Post Consultant Open 24,000.00 0.00 2018-12-31 2018-12-10 2019-02-18 2019-03-11 2019-04-15 2019-06-14 Advisory Services in Support Implementation Nepal Selection of Nepal Trade Information Portal Extension NIRTTP/PCO/TEPC/S/IND-70 / National IT Specialist for Strengthen Trade-Related Individual Quality Assurance and Under IDA / H8630 Institutional Capacity in Post Consultant Open 5,000.00 0.00 2018-12-31 2018-12-10 2019-02-18 2019-03-11 2019-04-15 2019-06-14 Advisory Services in Support Implementation Nepal Selection of Nepal Trade Information Portal Extension NIRTTP/PCO/PPD/S/IND-67 / Study to find out modality to Strengthen Trade-Related Individual Under provide efficient plant IDA / H8630 Institutional Capacity in Post Consultant Open 10,000.00 0.00 2019-03-01 2019-01-28 2019-04-19 2019-05-10 2019-06-14 2019-08-13 Implementation protection services in Federal Nepal Selection and Provinces NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual Under 71 / Social Safeguard Expert IDA / H8630 Institutional Capacity in Post Consultant Open 26,000.00 0.00 2019-01-22 2019-01-24 2019-03-12 2019-04-02 2019-05-07 2019-11-23 Implementation for Kathmandu ICD Nepal Selection NIRTTP/PCO/S/IND-72 / Strengthen Trade-Related Individual Preparation of Strategies for Under IDA / H8630 Institutional Capacity in Post Consultant Open 6,000.00 0.00 2019-04-15 2019-04-19 2019-06-03 2019-06-24 2019-07-29 2019-09-27 Export Promotion to the Implementation Nepal Selection European Union (EU) NIRTTP/PCO/S/IND-73 / Strengthen Trade-Related Individual Under Preparation of Strategies for IDA / H8630 Institutional Capacity in Post Consultant Open 7,000.00 0.00 2019-04-15 2019-04-19 2019-06-03 2019-06-24 2019-07-29 2019-09-27 Implementation Export Promotion to India Nepal Selection NIRTTP/PCO/IND-75 / Strengthen Trade-Related Individual Preparation of Strategies for Under IDA / H8630 Institutional Capacity in Post Consultant Open 5,000.00 0.00 2019-04-15 2019-04-19 2019-06-03 2019-06-24 2019-07-29 2019-09-27 Export Promotion to the Implementation Nepal Selection United Arab Emirates (UAE) NIRTTP/PCO/DOTM/S/IND- 77 / "System Design and Modernize transport and Individual Under software/hardware IDA / H8630 transit arrangements between Post Consultant Open 5,000.00 0.00 2019-04-30 2019-05-15 2019-05-26 2019-06-02 2019-06-24 2019-08-23 Implementation requirement for GPS vehicle Nepal and India Selection tracking system" NIRTTP/PCO/S/IND-80 / Strengthen Trade-Related Individual Under Environmental Specialist IDA / H8630 Institutional Capacity in Post Consultant Open 19,000.00 0.00 2019-05-05 2019-05-21 2019-05-31 2019-06-07 2019-06-29 2019-12-31 Implementation Consultant (National) Nepal Selection NIRTTP/PCO/DOC/S/SSS-87 / Quality Assurance and Advisory Services for Strengthen Trade-Related Implementation of Nepal IDA / H8630 Institutional Capacity in Post Direct Selection Direct 970,000.00 817,285.64 Signed 2019-08-01 2019-11-10 2019-08-11 2019-12-31 2019-10-15 2020-08-19 2021-10-14 National Single Window Nepal System & NTIP Extension work (TEPC) NIRTTP/PCO/DOC/S/IND-88 Strengthen Trade-Related Individual / Nepal National Single Pending IDA / H8630 Institutional Capacity in Post Consultant Open 60,000.00 0.00 2019-10-01 2019-11-19 2019-12-10 2020-01-14 2021-12-24 Window Project management Implementation Nepal Selection Consultant NIRTTP/PCO/S/IND-105 / Strengthen Trade-Related Individual Pending Preparation of Strategies for IDA / H8630 Institutional Capacity in Post Consultant Open 7,000.00 0.00 2019-08-30 2019-10-18 2019-11-08 2019-11-22 2020-01-01 Implementation Export Promotion to UK Nepal Selection NIRTTP/PCO/S/IND-106 / Strengthen Trade-Related Individual Pending Preparation of Strategies for IDA / H8630 Institutional Capacity in Post Consultant Open 7,000.00 0.00 2019-08-30 2019-10-18 2019-11-08 2019-11-22 2020-01-01 Implementation Export Promotion to EU Nepal Selection NIRTTP/PCO/S/IND-107 / Strengthen Trade-Related Individual Pending Preparation of Strategies for IDA / H8630 Institutional Capacity in Post Consultant Open 7,000.00 0.00 2019-08-30 2019-10-18 2019-11-08 2019-11-22 2020-01-01 Implementation Export Promotion to Japan Nepal Selection NIRTTP/PCO/S/IND-108 / Strengthen Trade-Related Individual Pending Preparation of Strategies for IDA / H8630 Institutional Capacity in Post Consultant Open 7,000.00 0.00 2019-08-30 2019-10-18 2019-11-08 2019-11-22 2020-01-01 Implementation Export Promotion to Canada Nepal Selection NIRTTP/PCO/S/IND-109 / Strengthen Trade-Related Individual Preparation of Strategies for Pending IDA / H8630 Institutional Capacity in Post Consultant Open 7,000.00 0.00 2019-08-30 2019-10-18 2019-11-08 2019-11-22 2020-01-01 Export Promotion to Implementation Nepal Selection Bangladesh Strengthen Trade-Related Individual NIRTTP/PCO/S/IND-99 / Under IDA / H8630 Institutional Capacity in Prior Consultant Open 56,000.00 0.00 2019-08-18 2019-11-28 2019-10-06 2019-10-27 2019-12-01 2021-12-31 Procurement Specialist Implementation Nepal Selection NIRTTP/PCO/S/IND-110 / A Strengthen Trade-Related Individual Under study on export prospects of IDA / H8630 Institutional Capacity in Post Consultant Open 10,000.00 0.00 2019-11-11 2019-11-25 2019-12-10 2019-12-17 2019-12-31 2020-03-30 Implementation drinking water in Nepal Nepal Selection NIRTTP/PCO/S/IND-111 / Preparation of strategic plan Modernize transport and Individual Under of commerce sector of Nepal IDA / H8630 transit arrangements between Post Consultant Open 27,500.00 0.00 2019-11-27 2020-01-06 2019-12-26 2020-01-02 2020-01-16 2020-04-25 Implementation with separate medium term Nepal and India Selection and long term plan of actions. NIRTTP/PCO/DOTM/S/IND- Modernize transport and Individual 116 / Procurement of System Under IDA / H8630 transit arrangements between Post Consultant Limited 30,000.00 0.00 2020-01-20 2020-01-29 2020-02-04 2020-02-11 2020-03-03 2021-07-16 Supervision Consultant for Implementation Nepal and India Selection GPS-Vehicle Tracking System Page 9 NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual Under 100 / Procurement of Social IDA / H8630 Institutional Capacity in Post Consultant Direct 7,000.00 0.00 2020-07-30 2020-08-04 2020-08-04 2020-08-04 2021-01-31 Implementation Safeguard mobilizer Nepal Selection NIRTTP/PCO/DOTM//IND- Strengthen Trade-Related Individual Under 101 / Hiring of Technical IDA / H8630 Institutional Capacity in Post Consultant Direct 12,000.00 0.00 2020-07-31 2020-09-11 2020-08-01 2020-08-01 2020-08-01 2021-01-28 Implementation Advisor for DoTM (National) Nepal Selection NIRTTP/PCO/S/IND-102 / Strengthen Trade-Related Individual Under Hiring of Environmental IDA / H8630 Institutional Capacity in Post Consultant Direct 9,000.00 0.00 2020-07-31 2020-08-01 2020-08-01 2020-08-01 2021-01-28 Implementation Safeguard Specialist (National) Nepal Selection NIRTTP/PCO/S/IND-103 / Strengthen Trade-Related Individual Under Hiring of Social Safeguard IDA / H8630 Institutional Capacity in Post Consultant Direct 8,000.00 0.00 2020-07-31 2020-08-01 2020-08-01 2020-08-01 2021-01-28 Implementation Specialist Nepal Selection NIRTTP/PCO/S/IND-104 / Strengthen Trade-Related Individual Hiring of Trade Development IDA / H8630 Institutional Capacity in Post Consultant Direct 14,000.00 0.00 Canceled 2020-07-31 2020-08-01 2020-08-01 2020-08-01 2021-01-28 Adviser Nepal Selection NIRTTP/PCO/S/IND-122 / Strengthen Trade-Related Individual Under Hiring of Senior Infrastructure IDA / H8630 Institutional Capacity in Post Consultant Direct 8,000.00 0.00 2020-07-31 2020-08-01 2020-08-01 2020-08-01 2021-01-28 Implementation Engineer Nepal Selection NIRTTP/PCO/S/IND-123 / Strengthen Trade-Related Individual Under Hiring of Trade Facilitator IDA / H8630 Institutional Capacity in Post Consultant Direct 12,000.00 0.00 2020-07-31 2020-07-31 2020-08-01 2020-08-01 2020-08-01 2021-01-28 Implementation Adviser Nepal Selection NIRTTP/PCO/S/IND-124 / Strengthen Trade-Related Individual Hiring of Procurement and Under IDA / H8630 Institutional Capacity in Prior Consultant Open 28,000.00 0.00 2020-08-07 2020-09-09 2020-10-05 2020-10-26 2020-11-30 2021-11-30 Contract Management Implementation Nepal Selection Specialist NIRTTP/PCO/S/IND-104-2 / Strengthen Trade-Related Individual Under Hiring of Trade Development IDA / H8630 Institutional Capacity in Post Consultant Open 26,000.00 0.00 2020-08-23 2020-08-28 2020-10-05 2020-10-19 2020-11-16 2021-11-16 Implementation Adviser Nepal Selection NIRTTP/PCO/MOALD/S/IND- 125 / Hiring of Individual Strengthen Trade-Related Individual Consultant for Sanitary and Under IDA / H8630 Institutional Capacity in Post Consultant Limited 6,500.00 0.00 2020-09-13 2020-09-14 2020-09-16 2020-09-30 2020-10-14 2021-04-12 Phytosanitary (SPS) /Plant Implementation Nepal Selection Quarantine and Regional Plant Protection Laboratory NIRTTP/PCO/MOALD/S/IND- 126 / Hiring of Individual Strengthen Trade-Related Individual Consultant for preparing Under IDA / H8630 Institutional Capacity in Post Consultant Direct 1,000.00 0.00 2020-11-06 2020-11-16 2020-11-23 2020-12-14 2021-06-12 furniture specifications and Implementation Nepal Selection related documents for SPS laboratory. NIRTTP/PCO/S/IND-128 / Procurement of Individual Strengthen Trade-Related Individual Consultant for feasibility Under IDA / H8630 Institutional Capacity in Post Consultant Limited 8,600.00 0.00 2020-12-24 2020-12-20 2020-12-31 2021-01-14 2021-02-12 2021-05-13 study of service trade of Nepal Implementation Nepal Selection with India and SAARC countries. NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual Under 129 / Hiring of Environmental IDA / H8630 Institutional Capacity in Post Consultant Open 12,000.00 0.00 2021-01-10 2021-01-13 2021-02-14 2021-02-21 2021-03-14 2021-11-29 Implementation Safeguard for NITDB ,ICD Nepal Selection NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual Under 130 / Hiring of Social IDA / H8630 Institutional Capacity in Post Consultant Open 12,000.00 0.00 2021-01-10 2021-01-13 2021-02-14 2021-02-28 2021-03-14 2021-11-29 Implementation Safeguard for NITDB, ICD Nepal Selection NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual Under 131 / Hiring of Social IDA / H8630 Institutional Capacity in Post Consultant Open 4,200.00 0.00 2021-01-10 2021-02-14 2021-02-21 2021-03-14 2021-11-29 Implementation mobiliser for ICD Nepal Selection NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual 132 / Hiring of Senior Under IDA / H8630 Institutional Capacity in Post Consultant Open 12,000.00 0.00 2021-01-10 2021-01-19 2021-02-14 2021-02-21 2021-03-14 2021-11-29 infrastructure Engineer for Implementation Nepal Selection NITDB NIRRTP/PCO/NITDB/S/IND- 133 / Hiring of Strengthen Trade-Related Individual Under Communications and IDA / H8630 Institutional Capacity in Post Consultant Open 12,000.00 0.00 2021-01-10 2021-02-14 2021-02-21 2021-03-14 2021-11-29 Implementation Stakeholder Engagement Nepal Selection Specialist for NITDB NIRTTP/PCO/NITDB/S/IND- Strengthen Trade-Related Individual 134 / Hiring of Occupational Under IDA / H8630 Institutional Capacity in Post Consultant Open 12,000.00 0.00 2021-01-10 2021-02-14 2021-02-28 2021-03-14 2021-11-29 Health and Safety Safeguard Implementation Nepal Selection for NITDB NIRTTP/PCO/DOTM/S/IND- Strengthen Trade-Related Individual Under 135 / Hiring of Technical IDA / H8630 Institutional Capacity in Post Consultant Open 20,000.00 0.00 2021-01-10 2021-01-18 2021-02-14 2021-02-21 2021-03-14 2021-11-29 Implementation Adviser for DoTM Nepal Selection Page 10 PROCUREMENT PLAN (Textual Part) Project information: West Bengal Electricity Distribution Grid Modernization Project (P170590) Project Implementation agency: West Bengal State Electricity Distribution Company Limited (WBSEDCL) Date of the Procurement Plan: 22 June 2020 Period covered by this Procurement Plan: June 2020 - until publication of next revision Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. Most of the procurements will follow NPP procedure using Bank’s National Procurement Document. National Procurement Arrangements: National competition for the procurement of goods, works and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3 – 5.6 of Section V of the Regulations and the following provisions: a. Only the model bidding documents for National Competitive Procurement agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding. b. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. c. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises or enterprises from any given State. d. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. e. GeM set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations1 method. f. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. g. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. h. The Request for Bids/Request for Proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. j. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety risks and impacts. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: will be applicable for those contracts identified in the Procurement Plan table; Works: Not applicable Other Relevant Procurement Information. Procurement Plan: The Implementing Agencies shall prepare a procurement plan and will submit to the Bank through STEP portal for all activities barring which special exemption given by the Bank for not using 1 To the extent possible, competitive bidding/e-RA options will be used while using GeM STEP. The approved procurement plan shall be automatically disclosed to the public through STEP portal. Project Procurement Strategy for Development (PPSD): PPSD has been prepared by the Borrower with Bank’s support and outcome of PPSD is updated in the procurement plan. Procurement Methods/Threshold Procurement Approaches and Thresholds (US$ equivalent) Methods Open international (Works) Any value Open national (Works) Up to 40 million Open international (goods, IT Any value system, and non-consulting services) Open national (goods, IT system, Up to 10 million and non-consulting services) National request for quotation Up to 100,000 (works, goods , IT & NCS) Direct selection No threshold; For goods/non-consulting services: According to paragraphs 6.8–6.10 of the Regulations; For consultants: According to paragraphs 7.13–7.15 of the Regulations Shortlist of national consultants Up to 800,000 Procurement prior-review thresholds. The World Bank will prior review the following contracts: (a) Works: All contracts more than US$10 million equivalent (b)Goods and IT system: All contracts more than US$2 million equivalent (c) Non-consulting services: All contracts more than US$2 million equivalent (d)Consultants (Firms): All contracts >US$1 million equivalent and (e) Consultants (Individual): All contracts >US$300,000 equivalent (f) Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: • procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulation for Borrowers • competitive dialogue; • sustainable procurement; • selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations for Borrowers; and • best and final offer. Post Review: All contracts not subject to prior review by the World Bank will be subject to post review during the project’s Implementation Support Missions (ISM) and/or special post review missions including missions by consultants hired by the Bank. The World Bank may conduct, at any time, independent procurement reviews of all the contracts financed under the loan. Also, if there are internal audits carried out for sample procurements, the Borrower may consult with the World Bank to include the Bank’s requirements under the TOR for such audits, in which case the Bank will only review the internal audit reports. Tentative Procurement plan (First 03 months) S.N Activity Name of Est. Meth Bank Oversight Expected Expected . No Activity Cost od/A date of date of (US$ ppro publication signing of Million ach of IFB/ RFP contract ) 1 HVDS-1 HVDS in 11.87 NCB Prior review Aug-20 Nov-20 Alipurduar (S & District I) HVDS-2 HVDS in 11.87 NCB Prior review Aug-20 Nov-20 Coochbehar (S & District I) 2 HVDS-3 HVDS in 11.87 NCB Prior review Aug-20 Nov-20 Jalpaiguri District (S & I) HVDS-4 HVDS in 11.87 NCB Prior review Aug-20 Nov-20 Darjeeling (S & District I) 3 HVDS-5 HVDS in Uttar 11.87 NCB Prior review Aug-20 Nov-20 Dinajpur District S.N Activity Name of Est. Meth Bank Oversight Expected Expected . No Activity Cost od/A date of date of (US$ ppro publication signing of Million ach of IFB/ RFP contract ) (S & I) HVDS-6 HVDS in Dakshin 11.87 NCB Prior review Aug-20 Nov-20 Dinajpur District (S & I) 4 HVDS-7 HVDS in Malda 11.87 NCB Prior review Aug-20 Nov-20 District (S & I) HVDS-8 HVDS in Nadia 11.87 NCB Prior review Aug-20 Nov-20 District (S & I) 5 HVDS-9 HVDS in Howrah 11.87 NCB Prior review Aug-20 Nov-20 District (S & I) HVDS-10 HVDS in Purba 11.87 NCB Prior review Aug-20 Nov-20 Midnapur District (S & I) 6 HVDS-11 HVDS in Bankura 11.87 NCB Prior review Aug-20 Dec-20 District (S & I) HVDS-12 HVDS in Purulia 11.87 NCB Prior review Aug-20 Dec-20 District (S & I) 7 HVDS-13 HVDS in 11.87 NCB Prior review Aug-20 Dec-20 Murshidabad (S & District I) PROCUREMENT India : West Bengal Electricity Distribution Grid Modernization Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2020-06-22 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170590 GPN Date: 2020-03-03 Project Name: West Bengal Electricity Distribution Grid Modernization Project Loan / Credit No: / W Executing Agency(ies): est Bengal State Electricity Distribution Company Limited WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-WBSEDCL-183966-CW- RFB / Implementation of High Under Distribution System Single Stage - Two 6,316,742.9 2022-12- Voltage Distribution System / Prior Request for Bids Open - National Implementat 2020-07-20 2020-07-27 2020-08-05 2020-08-07 2020-09-04 2020-09-22 2020-11-10 2020-12-14 2020-12-23 Strengthening Envelope 6 22 (HVDS) in Howrah district of ion West Bengal IN-WBSEDCL-183989-CW- RFB / Implementation of High Under Distribution System Single Stage - Two 6,856,037.0 2022-12- Voltage Distribution System / Prior Request for Bids Open - National Implementat 2020-07-20 2020-07-27 2020-08-05 2020-08-07 2020-09-04 2020-09-22 2020-11-10 2020-12-13 2020-12-23 Strengthening Envelope 1 22 (HVDS) in Purba Midnapur ion district of West Bengal IN-WBSEDCL-187644-CW- RFB / Conversion of overhead Under Distribution System Single Stage - Two 2023-01- network to underground / Prior Request for Bids Open - National 0.00 Implementat 2020-08-14 2020-08-24 2020-08-25 2020-08-26 2020-09-29 2020-09-29 2020-11-10 2020-12-29 2021-01-31 Strengthening Envelope 30 cabling system for Baruipur ion Town IN-WBSEDCL-189633-CW- RFB / Implementation of High Under Voltage Distribution System Distribution System Single Stage - Two 11,345,475. 2023-01- / Prior Request for Bids Open - National Implementat 2020-08-25 2020-08-31 2020-09-04 2020-09-04 2020-10-09 2020-11-03 2020-12-04 2021-02-12 2021-01-31 (HVDS) in Alipurduar and Strengthening Envelope 85 30 ion Coochbehar districts of West Bengal IN-WBSEDCL-189638-CW- RFB / Implementation of High Under Voltage Distribution System Distribution System Single Stage - Two 18,959,985. 2023-01- / Prior Request for Bids Open - National Implementat 2020-08-25 2020-09-01 2020-09-04 2020-09-04 2020-10-09 2020-11-03 2020-12-04 2021-02-10 2021-01-31 (HVDS) in Uttar Dinajpur, Strengthening Envelope 75 30 ion Dakshin Dinajpur and Malda districts of West Bengal IN-WBSEDCL-189639-CW- RFB / Implementation of High Under Distribution System Single Stage - Two 11,274,497. 2023-01- Voltage Distribution System / Prior Request for Bids Open - National Implementat 2020-08-25 2020-08-31 2020-09-04 2020-09-04 2020-10-09 2020-11-03 2020-12-04 2021-02-02 2021-01-31 Strengthening Envelope 14 30 (HVDS) in Bankura and Purulia ion districts of West Bengal IN-WBSEDCL-189972-CW- RFB / Supply and Installations of 02 nos. New 33/11 KV Sub- Under Distribution System Single Stage - Two 2022-07- Stations and associated 33 KV / Post Request for Bids Open - National 0.00 Implementat 2020-08-25 2020-08-26 2020-08-26 2020-08-26 2020-09-29 2020-09-29 2020-11-10 2020-12-03 2021-01-31 Strengthening Envelope 30 & 11 KV lines in Alipurduar ion Region of WBSEDCL in West Bengal. IN-WBSEDCL-211042-CW- RFB / Conversion of Overhead Network into Underground Under Distribution System Single Stage - Two 2023-04- cable system at Rajarhat Town / Prior Request for Bids Open - National 0.00 Implementat 2020-12-24 2021-01-11 2021-01-05 2021-01-13 2021-02-08 2021-03-25 2021-03-03 2021-06-06 2021-04-30 Strengthening Envelope 29 under North 24 Parganas ion district within the state of West Bengal IN-WBSEDCL-211050-CW- RFB / Conversion of Overhead Network into Underground Under Distribution System Single Stage - Two 2023-04- cable system at Baguiati and / Prior Request for Bids Open - National 0.00 Implementat 2020-12-24 2021-01-11 2021-01-05 2021-01-13 2021-02-08 2021-02-08 2021-03-03 2021-06-08 2021-04-30 Strengthening Envelope 29 Keshtopur Towns under North ion 24 Parganas district within the state of West Bengal IN-WBSEDCL-211428-CW- RFB / Implementation of High Under Voltage Distribution System Distribution System Single Stage - Two 2023-05- / Prior Request for Bids Open - National 0.00 Implementat 2020-12-30 2021-01-04 2021-01-05 2021-01-05 2021-02-05 2021-02-10 2021-03-09 2021-05-24 2021-05-06 (HVDS) in Nadia and Strengthening Envelope 05 ion Murshidabad districts of West Bengal (2 packages) IN-WBSEDCL-234470-CW- RFB / Supply and Installation of High Voltage Distribution Other (with Under Distribution System Single Stage - Two 2023-09- System (HVDS) in semi-urban / Prior Request for Bids Open - National field for 0.00 Implementat 2021-05-18 2021-05-20 2021-06-10 2021-07-14 2021-08-31 2021-10-28 Strengthening Envelope 29 and rural areas in Jalpaiguri & explanation) ion Darjeeling (Plain area) Districts in West Bengal IN-WBSEDCL-233597-CW- RFB / Conversion of Overhead Network into Underground cable system at KhargapurTown under North Other (with Under Distribution System Single Stage - Two 2023-09- 24 Parganas Paschim / Prior Request for Bids Open - National field for 0.00 Implementat 2021-05-13 2021-05-26 2021-05-21 2021-06-04 2021-06-24 2021-09-06 2021-10-26 Strengthening Envelope 20 Midnapore district within the explanation) ion state of West Bengal' under West Bengal Electricity Distribution Grid Modernisation Project Page 1 IN-WBSEDCL-233611-CW- RFB / Conversion of Overhead Network into Underground cable system at Asansol Town(Part 1) under Paschim Other (with Under Distribution System Single Stage - Two 2023-09- Burdwan district within the / Prior Request for Bids Open - National field for 0.00 Implementat 2021-05-13 2021-05-23 2021-05-21 2021-06-01 2021-06-24 2021-09-06 2021-10-26 Strengthening Envelope 20 state of West Bengal' under explanation) ion West Bengal Electricity Distribution Grid Modernisation Project (P-170590) IN-WBSEDCL-233612-CW- RFB / Conversion of Overhead Network into Underground cable system at Asansol Town(Part 2) under Paschim Other (with Under Distribution System Single Stage - Two 2023-09- Burdwan district within the / Prior Request for Bids Open - National field for 0.00 Implementat 2021-05-13 2021-05-23 2021-05-21 2021-06-01 2021-06-24 2021-09-06 2021-10-26 Strengthening Envelope 20 state of West Bengal' under explanation) ion West Bengal Electricity Distribution Grid Modernisation Project (P-170590) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-WBSEDCL-213824-CS- CQS / Invitation of EOI & RFP under International Procurement for Engagement Distribution System Quality And Cost- of PMA i.r.o HVDS projects for / Prior Open - International 0.00 Canceled 2021-01-25 2021-02-04 2021-02-02 2021-02-09 2021-03-18 2021-04-17 2021-05-17 2021-06-21 2021-07-26 2023-07-25 Strengthening Based Selection West Bengal Electricity Distribution Grid Modernization Project under World Bank loan financing IN-WBSEDCL-217209-CS- QCBS / Invitation of EOI & RFP under International Procurement for Engagement of PMA for conversion of OH Distribution System Quality And Cost- Under network into UG cable system / Prior Open - International 0.00 2021-02-03 2021-02-03 2021-02-09 2021-02-05 2021-04-16 2021-05-07 2021-05-27 2021-07-05 2021-08-12 2023-08-11 Strengthening Based Selection Implementation at 5 towns(6 Pkgs) for West Bengal Electricity Distribution Grid Modernisation Project under World Bank loan financing IN-WBSEDCL-229919-CS- QCBS / Invitation of EOI & RFP under International Procurement for Engagement Distribution System Quality And Cost- Under of PMA i.r.o HVDS projects for / Prior Open - International 0.00 2021-04-19 2021-05-06 2021-04-21 2021-05-06 2021-05-07 2021-06-02 2021-06-16 2021-07-05 2021-08-12 2023-08-11 Strengthening Based Selection Implementation West Bengal Electricity Distribution Grid Modernization Project under World Bank loan financing IN-WBSEDCL-239229-CS- QCBS / Direct RFP - Consultancy Services for Smart Grid Development in Quality And Cost- Pending / Post Open - National 0.00 2021-06-30 2021-06-30 2021-07-07 2021-08-04 2021-09-03 2021-10-08 2021-11-17 2023-11-17 Project Management of Urban Areas Based Selection Implementation deployment of SCADA/DMS/OMS in WBSEDCL INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-WBSEDCL-171642-CS- CDS / Hiring a consultant for preparation of ESMF and ESIA documents for Distribution System Under / Post Direct Selection Direct 0.00 2020-07-01 2019-06-12 2020-07-15 2019-07-13 2020-08-19 2021-02-15 implementation of HVDS & Strengthening Implementation construction of GIS in 13 districts and UG cabling in 6 Towns of West Bengal IN-WBSEDCL-171990-CS- CDS / Hiring a consultant for preparation of DPR and PPSD for implementation of HVDS & Distribution System Under / Post Direct Selection Direct 0.00 2020-07-01 2019-06-12 2020-07-15 2019-07-29 2020-08-19 2021-02-15 construction of GIS in 13(+1) Strengthening Implementation districts and UG cabling in 6 Towns in WBSEDCL area of West Bengal Page 2 IN-WBSEDCL-181570-CS- CDS / Preparation of DPR for implementation of AMI project Smart Grid Development in Under / Post Direct Selection Direct 0.00 2020-07-01 2020-07-08 2020-07-11 2020-07-16 2020-09-14 2021-03-13 at different towns of West Urban Areas Implementation Bengal under World Bank assistance IN-WBSEDCL-181585-CS- CDS / Preparation of DPR for implementation of SCADA/ Smart Grid Development in Under / Post Direct Selection Direct 0.00 2020-07-01 2020-07-10 2020-07-11 2020-07-17 2020-09-14 2021-03-13 DMS project at different towns Urban Areas Implementation of West Bengal under World Bank assistance Page 3 Procurement Plan for ASPIRe Project I. General 1. Project information: Country : India Borrower : Republic of India Project Name : Assam State Public Finance Institutional Reforms (ASPIRe) Project Loan / Credit No. : Project Implementing : Assam Society for Comprehensive Agency (PIA), etc. Financial Management System 2. Bank’s approval Date of the procurement Plan [Original : ………; Revision 1:……..…] 3. Date of General Procurement Notice: 13th December 2016 4. Period covered by this procurement plan: First 18 months II. Goods and Works and non-consulting services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. World Bank review of procurement: The World Bank will prior review (thresholds are based on “Substantial” rating, will be modified if risk rating is changed after assessment by Bank during the project implementation) the following contracts: a) Works including turnkey Supply & Installation of Plant and Equipment and PPP: All contracts more than US$ 10 million equivalent b) Goods, Information Technology and Non-consulting Services: All contracts more than US$ 2 million equivalent First contract issued by implementing agency [IA] will be subject to prior review irrespective of their value. In addition, the justifications for all contracts to be issued on the basis of LIB, single-source or direct contracting will be subject to prior review. The above thresholds are for the initial 18 months implementation period; based on the procurement performance of the project these thresholds may be subsequently modified by Bank. In case of Post Review contracts, the inputs of Bank on Technical Specifications will be obtained by project. The procurement plan will be subsequently updated annually (or at any other time if required) and will reflect any change in prior review thresholds. The World Bank will carry out an annual ex-post procurement review of the procurement falling below the prior review thresholds provided above. To avoid any doubts, the Bank may conduct at any time Independent Procurement Reviews (IPRs) of all the contracts financed under the loan. Domestic preference is allowed only for Procurement of Goods and Information Technology and not for procurement of Works. Categor Method Threshold Method of Procurement y (US$ Equivalent) Works International Competitive Bidding > 40,000,000 (ICB) National Competitive Bidding Up to 40,000,000 (with (NCB) NCB conditions) Shopping Up to 100,000 As per paragraph 3.7 of Direct Contracting (DC) Guidelines Public-Private Partnership (PPP) As per paragraph 3.14 of for Works Guidelines As per paragraph 3.9 of Force Account Guidelines As per paragraph 3.6 of Framework Agreement (FA) Guidelines Goods International Competitive Bidding > 3,000,000 and non- (ICB) consultan Limited International Bidding (LIB) wherever agreed by Bank t services National Competitive Bidding Up to 3,000,000 (with NCB (NCS) (NCB) conditions) Shopping Up to 100,000 Direct Contracting (DC) As per paragraph 3.7 of Guidelines Public-Private Partnership (PPP) As per paragraph 3.14 of Services Guidelines Force Account (only for NCS) As per paragraph 3.9 of Guidelines Framework Agreement (FA)1 As per paragraph 3.6 of Guidelines Procurement from United Nations As per paragraph 3.10 of (UN) Agencies Guidelines 1/ DGS&D rate contracts may be used as framework agreement (FA) subject to the conditiona mentioned uner NCB conditions 2. Prequalification. Pre-qualification is not envisaged for any package under the Project. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Implementation Plan: Project Implementation Plan dated ___________. (to be updated) 5. Retroactive Financing : The GoA will be seeking retroactive financing, not exceeding US$ 1 million for technical and US$ 3 million for the EEP, in respect of payments for project-related work made by GoA during project preparation, on or after April 01, 2016. This includes payments to consultants for various preparatory studies, which inform the design of the information solutions and institutional strengthening, training and exposure visits (under technical assistance part) and EEP incurred prior to loan signing. 6. NCB Condition: National competition for the procurement of goods and works according to the established thresholds will be conducted in accordance with paragraphs 3.3 & 3.4 of Section III of the Guidelines and the following provisions: a) Only the model bidding documents for NCB agreed with the GoI Task Force (and as amended from time to time), shall be used for bidding; b) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids; c) No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprises from any given State; d) Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; e) Extension of bid validity shall not be allowed with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/Employer); f) Re-bidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project; g) Rate contracts entered into by Directorate General of Supplies and Disposals (DGS&D) will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however for any procurement under the Shopping procedures; h) Use of DGS&D rate contracts as Framework Agreement must be reflected in the procurement plan agreed by the Bank for particular goods. Before issuing the purchasing order, the Bank will have to advise the government on carrying out a price analysis on the specific good that is intended to be purchased. If after this due diligence the borrower concludes [and Bank agrees] that the DGS&D rate contract is not suitable, then the borrower will have to proceed using NCB or shopping depending on the value. To meet the Bank's requirements for right to audit and F&C, these clauses may be included in the Purchase Orders [in case the purchasers are directly placing the purchase orders to DGS&D rate contract holders]. On the other hand, if indent is placed through DGS&D, the Purchaser has the option to sign a separate undertaking with DGS&D rate contract holder, where Bank’s right to audit and F&C clauses could be mentioned. Two or three envelope system will not be used (except when using e- procurement system assessed and agreed by the Bank). 7. Procurement Packages with Methods and Time Schedule as per Table A [attached] III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: a) Consultancy Services for selection of firms : All contracts more than US$ 1.0 million equivalent; b) Consultancy services for selection of individuals: All contracts above US$ 0.3 million. c) First contract issued by implementing agency [IA] will be subject to prior review irrespective of their value. In addition, the justifications for all contracts to be issued on the basis of single-source or direct contracting will be subject to prior review. The above thresholds are for the initial 18- month implementation period; based on the procurement performance of the project these thresholds may be subsequently modified by Bank. In case of Post Review contracts, the inputs of Bank on TORs will be obtained by project. The procurement plan will be subsequently updated annually (or at any other time if required) and will reflect any change in prior review thresholds. The World Bank will carry out an annual ex-post procurement review of the procurement falling below the prior review thresholds provided above. To avoid any doubts, the Bank may conduct at any time Independent Procurement Reviews (IPRs) of all the contracts financed under the loan. Selection Method Method Threshold (USD) Consultants’ Selection Based on Consultants’ Up to 300,000 Services Qualifications (CQS)/Least-Cost Selection (LCS) Single-Source Selection (SSS) As per paragraphs 3.9-3.11 of Guidelines Individuals As per Section V of Guidelines Particular Types of Consultants As per paragraphs 3.15-3.21 of Guidelines Quality- and Cost-Based Selection (QCBS)/ for all other cases Quality-Based Selection (QBS)/ Selection under a Fixed Budget (FBS) (i) International shortlist > 800,000 (ii) Shortlist may comprise national Up to 800,000 consultants only 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US $ 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: First consultancy selection shall be prior reviewed irrespective of threshold. Refer to sl. No. 4 under Section-II of the procurement plan 4. Consultancy Assignments with Selection Methods and Time Schedule as per Table A [attached] Table A Assam State Public Finance Institutional Reforms Project : 18 month Procurement Plan Prior Bid / Delivery Estimate Estimat Procure / Bid/REO Proposa Contract Ref. Contract / d Cost ed Cost ment post I l Signing Remarks No. Description Complet (INR) (USD) Method Revi Advert Opening Date ion Date ew Date CONSULTANT SERVICES Technical Assistance Sub- Component 1.1: Strengthening Cash & Debt Management Contract Awarded Advisor – Debt May be CS-1 and Cash 27,75,000 41,500 SSS post - - Jan 2017 Jan 2018 extended by Management another 3 years annually. Data Analytics Sep CS-2 67,00,000 100,000 IC post Oct 2017 Dec 2017 Dec 2021 For 4 years Consultants (2) 2017 Strengthening Public Procurement Framework, Procurement Capacity and Scaling Up E-Procurement Consultant for developing Contract CS-3 15,00,000 23,000 IC post NA NA May 2017 March 18 Procurement Awarded Rules (4 Nos.) Consultants for developing Feb CS-4 Standard Bidding 54,00,000 80,000 IC’s post NA NA Jun 2017 1 year 2018 Documents (SBDs)- 7 Nos Prior Bid / Delivery Estimate Estimat Procure / Bid/REO Proposa Contract Ref. Contract / d Cost ed Cost ment post I l Signing Remarks No. Description Complet (INR) (USD) Method Revi Advert Opening Date ion Date ew Date Consultants for 3-4 individual State 100,00,00 CS-5 149,000 IC’s post NA NA Nov 2017 Oct 2021 consultants for Procurement 0 4 years Facilitation Cell Consultant for study of the implementation & Mar CS-6 10,00,000 15,000 IC post NA NA Nov 2016 scale up of e- 2017 procurement in Assam Consultancy on Procurement Justification to Training Needs July June be prior CS-7 Analysis, Training 75,00,000 112,000 CQS/SSS post Aug2017 Sept 2017 2017 2018 reviewed by Strategy & Bank Curriculum Development Consultancy for June Aug CS-8 MOOC 50,00,000 75,000 QCBS post Nov 2018 Apr 2019 2018 2018 Development Senior E- Procurement July Aug CS-9 90,00,000 135,000 IC post Sept 2017 Jun 2020 For 3 years Project Mgt 2017 2017 Consultant E-Procurement May Contract CS-10 Facility Mgt Cell 72,60,000 108,000 IC post Apr2017 Jun 2017 Jun 2021 2017 awarded and Training Prior Bid / Delivery Estimate Estimat Procure / Bid/REO Proposa Contract Ref. Contract / d Cost ed Cost ment post I l Signing Remarks No. Description Complet (INR) (USD) Method Revi Advert Opening Date ion Date ew Date Strengthening PPP Framework Consultancy for Policy and CS – Institutional Dec Sep Contract 60,00,000 90,000 QCBS post Jul 2016 Feb 2017 11 Reform for 2016 2017 Awarded Strengthening PPP Framework Consultancy- CS – Project Mgmt and 2,00,00,00 Oct Dec Mar 298,000 QCBS post Feb 2018 12 Support Unit for 0 2017 2017 2022 PPP Institutional Strengthing of Finance Dept Consultancy for Review of Org’n Structure and file July Aug Aug CS-13 work flow process 56,00,000 83,000 IC post Sept 2017 1 year 2017 2017 2018 in Finance Dept and selected Line Dept Consultancy to review the Aug Sep CS-14 20,00,000 30,000 IC post Sep 2017 Jan 2018 5 months Budget & FRBM 2017 2017 Disclosures Training and Capacity Building in Finance Consultancy on Training Needs 100,00,00 July Sep CS-15 150,000 LCS post Dec 2017 Jun 2018 Analysis for 0 2017 2017 offcials in Finance and Line dept, Training Strategy & Curriculum Development Prior Bid / Delivery Estimate Estimat Procure / Bid/REO Proposa Contract Ref. Contract / d Cost ed Cost ment post I l Signing Remarks No. Description Complet (INR) (USD) Method Revi Advert Opening Date ion Date ew Date Consultancy for MOOC Development for 100,00,00 Mar CS-16 150,000 QCBS post Jun 2018 Aug 2018 Mar 2019 Finance Cadres in 0 2018 Finance and Line Dept Strengthening Expenditure & Revenue Information Systems Design of Financial Management Information Systems Consultants for Designing of Financial Management Information 1,60,00,00 Feb Contract CS-17 System for the 238,000 QCBS post Jul 2016 Jan 2017 Feb 2018 0 2016 Awarded Government of Assam and support in selection of the System Integrator Project Management Consultancy to 5,00,00,00 Dec Mar 4 years CS-18 745,000 QCBS post Jun 2018 Sep 2022 oversee 0 2017 2018 contract implementation of FMIS Security Audit of Periodic Audit FMIS E- 1,00,00,00 Aug Nov of various CS-19 149,000 LCS post Jan 2019 Dec 2021 Governance 0 2018 2018 modules -3 Solution years Designing Information Systems and Institutional Strengthening of Commercial Tax Dept Consultancy Study for preparation of RFP and selection Contract CS-20 72,00,000 107,000 SSS Nov 15 Apr 2016 Jun 2017 of Systems prior Awarded Integrator for new IT application for CTD Prior Bid / Delivery Estimate Estimat Procure / Bid/REO Proposa Contract Ref. Contract / d Cost ed Cost ment post I l Signing Remarks No. Description Complet (INR) (USD) Method Revi Advert Opening Date ion Date ew Date Consultancy services for Institutional and GST readiness Contract CS-21 70,00,000 105,000 QCBS post Jan 2016 Jul 2016 Jan 2017 Feb 2018 assessment in the Awarded Commissionerate of Taxes, Govt. of Assam Project Management Consultancy to 1,62,00,00 June Aug 3 years CS-22 oversee 241,000 QCBS post Sep 2017 Sep 2020 0 2017 2017 contract implementation of E-Governance Solution in CTD Security Audit of CTD E- Apr CS-23 70,00,000 104,000 LCS post Jun 2017 Aug 2018 Sep 2019 Governance 2018 Solution Service Tax Sep CS-24 54,00,000 80,000 IC post Oct 2017 Nov 2017 Dec 2017 For 3 years Advisor (I/C) 2017 Design Development & Implementation of E-Governance Solution in Excise Dept Consultancy services for designing an e- Governance CS– 1,00,00,00 Feb Contract system for the 150,000 QCBS post Jul 2016 Jan 2017 Feb 2018 25 0 2016 Awarded Department of Excise, Government of Assam, India. Project Management Consultancy to CS– 3,00,00,00 Nov Mar 4 years oversee 447,000 QCBS post Jun 2018 Sep 2022 26 0 2017 2018 contract implementation of E-Governance Solution in Excise Prior Bid / Delivery Estimate Estimat Procure / Bid/REO Proposa Contract Ref. Contract / d Cost ed Cost ment post I l Signing Remarks No. Description Complet (INR) (USD) Method Revi Advert Opening Date ion Date ew Date Security Audit of Periodic Audit Excise E- Aug Nov of various CS-27 70,00,000 104,000 LCS post Jan 2019 Dec 2020 Governance 2018 2018 modules -2 Solution years Website Upgrade Aug Nov CS-28 for Excise 20,00,000 30,000 LCS post Dec 2017 Mar 2018 2017 2017 Department Project Management & Coordination Sep Dec Contract CS-29 CA for AS-CFMS 15,00,000 23,000 QCBS post Feb 2017 Apr 2018 2016 2016 Awarded Senior Mar Contract CS-30 Procurement 28,00,000 42,500 SSS post N/A N/A Aug 2016 2018 Awarded Consultant Justification to Procurement Mar be prior CS-31 30,00,000 45,500 SSS post N/A N/A June 2017 Support Specialist 2019 reviewed For 2 years IT Project 1,20,00,00 July Aug Sept CS-32 180,000 IC post Sept2017 For 5 years Manager 0 2017 2017 2022 Change Aug Sept CS-33 Management 85,00,000 126,000 IC post July2017 Sept 2017 For 5 years 2017 2022 Specialist Communication July Aug Sept CS-34 81,00,000 120,000 IC post Sept 2017 For 5 years Specialist 2017 2017 2022 Part B: Eligible Expenditure under the Project DoAT Short term Feb Apr Contract CS-35 Programmers/ 43,40,000 65,000 IC post May 2017 Apr 2019 2017 2017 Awarded DBA (2 years) Programmers for development of 1,00,00,00 Aug CS-36 150,000 IC post Jun 2017 Sep 2017 Aug 2019 E-Colln Portal and 0 2017 its roll out Prior Bid / Delivery Estimate Estimat Procure / Bid/REO Proposa Contract Ref. Contract / d Cost ed Cost ment post I l Signing Remarks No. Description Complet (INR) (USD) Method Revi Advert Opening Date ion Date ew Date CTD Short term July Aug CS-37 Programmers/ 43,40,000 65,000 IC post Sept 2017 Apr 2019 2017 2017 DBA (2 years) 33,21,15,0 4,956,50 SUB TOTAL - A 00 0 NON-CONSULTANT SERVICES Strengthening network NCS- connectivity for 10,00,00,0 1,492,00 July Sept Sept 5 years NCB post Nov 2017 1 CTD offices - 00 0 2017 2017 2022 contract Secondary Service Provider Strengthening network NCS- connectivity for 7,00,00,00 1,044,00 Dec Mar Sept 5 years NCB post Jun 2018 2 DoAT offices - 0 0 2017 2018 2022 contract Secondary Service Provider Procurement NCS- Mar May Sept MOOC Hosting 25,00,000 37,000 NCB post Jul 2019 3 2019 2019 2022 and Maintenance Upgrade and NCS- July Sept Sept Maintenance of 20,00,000 30,000 NCB post Oct 2017 4 2017 2017 2022 CS-DRMS 17,45,00,0 2,603,00 SUB TOTAL - B 00 0 Procu Prior Bid / Delivery Estimated reme / Bid/REO Proposa Contract Ref. Contract Estimated / Cost nt post I l Signing Remarks No. Description Cost (INR) Complet (USD) Meth Revi Advert Opening Date ion Date od ew Date GOODS Field Level Hardware 10,00,00,00 Apr GD -1 1,492,000 NCB post Jun 2018 Aug 2018 Feb 2019 Procurement 0 2018 (Treasury) Hardware 13,65,00,00 Nov Feb Sept Contract GD-2 (Peripherals) for 2,037,000 NCB prior June 2017 0 2016 2017 2017 Awarded CTD Hardware 15,00,00,00 Apr GD-3 (Peripherals) for 2,238,000 NCB post Jun 2018 Aug 2018 Feb 2019 0 2018 Excise SI for FMIS Procurement Solution will be initiated Development of only after the 44,00,00,00 Oct Sept GD-4 FMIS solution, O 6,565,000 LIB prior Jan 2017 Mar 2018 recommendati 0 2017 2022 & M, including ons from the cost of Core agency hired Server Hardware under CS - 17 SI for Procurement implementation will be initiated for Excise: New e- only after the governance 35,00,00,00 Oct Sept GD-5 5,223,000 ICB prior Jan 2017 Mar 2018 recommendati system 0 2017 2022 ons from the System agency hired Development, O under CS - 25 &M SI for CTD - 35,00,00,00 May Sept GD-6 5,223,000 LIB prior Jan 2017 July 2017 development 0 2017 2022 cost, O&M and hardware cost (servers/ license fee) Procu Prior Bid / Delivery Estimated reme / Bid/REO Proposa Contract Ref. Contract Estimated / Cost nt post I l Signing Remarks No. Description Cost (INR) Complet (USD) Meth Revi Advert Opening Date ion Date od ew Date Procurement of Aug GD-7 Equipment for 3,00,00,000 447,000 NCB post Jun 2019 Nov 2019 Jun 2020 2019 Test labs 155,65,00,0 SUB TOTAL - C 23,225,000 00 MINOR WORKS Refurbishment of Aug 450,00,000 670,000 NCB Jan 2017 Apr 2017 June 2017 Server Room post 2017 Refurbishment of Dec Mar DoAT incl Training 100,00,000 150,000 NCB post Jun 2019 Mar 2020 2018 2019 Room Refurbishment of Dec Mar Finance Dept 150,00,000 150,000 NCB post Jun 2018 Mar 2019 2017 2018 Divisions Refursbishment Aug 40,00,000 60,000 NCB post Oct 2017 Nov 2017 Mar 2018 of AS-CFMS Office 2017 SUB TOTAL - D 690,00,000 1,030,000 Totals Estimated 213,21,15, 31,814,50 Costs: 000 00 (A + B + C) PROCUREMENT India : Assam State Public Finance Institutional Reforms (ASPIRe) Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2016-12-12 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157198 GPN Date: 2016-12-12 Project Name: Assam State Public Finance Institutional Reforms (ASPIRe) Project Loan / Credit No: / , IBRD / 87650 A Executing Agency(ies): ssam Society for Comprehensive Financial Management System WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Strengthening Expenditure IN-AS-CFMS-5984-CW-RFP / Request for Single Stage - Two 2017-09- / and Revenue Information Post Open - National 670,000.00 0.00 Canceled 2017-02-10 2017-02-15 2017-03-17 2017-04-16 2017-05-12 Refurbishment of Server Room Proposals Envelope 09 Systems IN-AS-CFMS-72908-CW-RFB Project Management, / Interior finishing and Single Stage - Two 2022-01- IBRD / 87650 Monitoring & Evaluation and Post Request for Bids Open - National 220,000.00 0.00 Canceled 2018-08-30 2018-09-04 2018-10-02 2018-12-15 2019-01-19 furnishing of AS-CFMS Office Envelope 18 Coordination Space IN-AS-CFMS-79710-CW-RFQ / Furnishing and Finishing Project Management, Works at the AS-CFMS Office Request for Single Stage - One 2019-03- IBRD / 87650 Monitoring & Evaluation and Post Open - National 64,000.00 55,149.52 Signed 2018-10-10 2018-12-05 2018-12-21 Space: Civil, Floor Finishes, Quotations Envelope 15 Coordination Carpentry, Stone Works & Plumbing IN-AS-CFMS-79723-CW-RFQ / Furnishing and Finishing Project Management, Request for Single Stage - One 2019-03- Works at the AS-CFMS Office IBRD / 87650 Monitoring & Evaluation and Post Open - National 65,000.00 56,249.26 Signed 2018-10-10 2018-12-05 2018-12-21 Quotations Envelope 15 Space: Electrical, Fire Fighting Coordination & Ceiling Works IN-AS-CFMS-79733-CW-RFQ / Furnishing and Finishing Project Management, Pending Works at the AS-CFMS Office Request for Single Stage - One 2019-03- IBRD / 87650 Monitoring & Evaluation and Post Open - National 64,000.00 0.00 Implementat 2018-10-10 2018-12-05 Space: Furniture, Storage, Quotations Envelope 15 Coordination ion Paint Polishes & Miscellaneous Works Strengthening Expenditure Pending IN-AS-CFMS-5984-CW-RFB / Single Stage - Two 2019-11- IBRD / 87650 and Revenue Information Post Request for Bids Open - National 670,000.00 0.00 Implementat 2019-02-11 2019-02-16 2019-03-30 2019-06-12 2019-07-17 Refurbishment of Server Room Envelope 14 Systems ion IN-AS-CFMS-129209-CW- RFQ / SUPPLY & INSTALLATION OF NETWORK HARDWARE AND AIR Strengthening Expenditure CONDITIONERS INCLUDING Request for Single Stage - One 2024-10- IBRD / 87650 and Revenue Information Post Open - National 40,000.00 39,775.52 Signed 2019-08-29 2021-02-18 2019-10-10 2019-11-19 ELECTRICAL AND NETWORK Quotations Envelope 08 Systems CABLING WORK AT COMMISSIONERATE OF EXCISE AND DIRECTORATE OF ACCOUNTS AND TREASURIES IN-AS-CFMS-92284-CW-RFQ Strengthening Expenditure / Excise Electrical and Request for Single Stage - One 2019-05- IBRD / 87650 and Revenue Information Post Open - National 21,500.00 0.00 Canceled 2019-01-02 2019-02-27 Network Cabling Works Quotations Envelope 28 Systems including network devices IN-AS-CFMS-160371-CW- RFB / Refurbishment of 12 Pending Strengthening Public Finance Single Stage - Two 2021-02- Divisions (3 Floors) of Finance IBRD / 87650 Post Request for Bids Open - National 1,300,000.00 0.00 Implementat 2020-03-15 2020-03-20 2020-05-01 2020-07-14 2020-08-18 Institutional Capacity Envelope 14 Department including ion Centralised Air Conditioning IN-AS-CFMS-173069-CW- Strengthening Expenditure Request for Single Stage - One 2021-01- RFQ / Electrification Works at IBRD / 87650 and Revenue Information Post Limited 20,000.00 0.00 Canceled 2020-05-29 2020-07-24 Quotations Envelope 20 Kar Bhawan Data Centre Systems IN-AS-CFMS-186514-CW- Strengthening Expenditure Pending 2025-09- DIR / Electrification Works at IBRD / 87650 and Revenue Information Post Direct Selection Direct 20,000.00 0.00 Implementat 2020-07-31 2020-08-05 2020-09-09 08 Kar Bhawan Data Centre Systems ion IN-AS-CFMS-218781-CW- Strengthening Expenditure Pending RFQ / Refurbishment of office Request for Single Stage - One 2021-10- IBRD / 87650 and Revenue Information Post Open - National 46,000.00 0.00 Implementat 2021-02-24 2021-04-21 space for IFMIS Helpdesk at F Quotations Envelope 18 Systems ion Block, Janata Bhawan GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-AS-CFMS-6159-GO-RFB / Strengthening Expenditure SI for CTD - development Single Stage - Two IBRD / 87650 and Revenue Information Prior Request for Bids Limited 5,223,000.00 5,291,185.90 Signed 2017-02-03 2017-02-08 2017-02-06 2017-03-23 2017-06-06 2017-06-20 2018-04-05 2017-07-25 2019-05-30 2022-07-24 cost, O&M and hardware cost Envelope Systems (servers/ license fee) IN-AS-CFMS-4577-GO-RFP / Strengthening Expenditure Single Stage - Two Hardware (Peripherals) for / and Revenue Information Prior Request for Bids Open - National 2,037,000.00 0.00 Canceled 2017-01-30 2017-06-30 2017-01-30 2017-06-30 2017-01-30 2016-12-30 2017-01-30 2017-02-19 2017-08-18 Envelope CTD Systems IN-AS-CFMS-4577-GO-RFB / Strengthening Expenditure Single Stage - One Hardware (Peripherals) for IBRD / 87650 and Revenue Information Prior Request for Bids Open - National 2,037,000.00 2,841,038.80 Signed 2017-07-27 2017-08-01 2017-08-10 2017-08-06 2016-12-30 2017-08-11 2017-08-16 2017-08-16 2017-07-19 2022-08-15 Envelope CTD Systems Page 1 IN-AS-CFMS-27940-GO-RFB / National Competitive Bidding for Supply of Server, Strengthening Public Finance Single Stage - Two IBRD / 87650 Post Request for Bids Open - National 1,230,770.00 0.00 Canceled 2017-09-14 2017-09-20 2017-09-15 2017-09-21 2017-10-26 2018-01-08 2018-02-12 2023-02-11 Software and Network Institutional Capacity Envelope Hardware at the Directorate of Accounts and Treasuries IN-AS-CFMS-45495-GO-RFB / National Competitive Bidding for Supply of Server Under Strengthening Public Finance Single Stage - Two and its Peripherals, Software IBRD / 87650 Post Request for Bids Open - National 616,000.00 0.00 Implementati 2018-02-09 2018-02-16 2018-02-14 2018-03-28 2018-06-10 2018-07-15 2023-07-14 Institutional Capacity Envelope including Migration Activity at on the Directorate of Accounts and Treasuries. IN-AS-CFMS-64741-GO-RFB Under Strengthening Public Finance Single Stage - Two / System Integrator for Excise IBRD / 87650 Prior Request for Bids Open - National 2,815,000.00 0.00 Implementati 2018-06-08 2018-06-29 2018-06-13 2018-10-31 2018-08-10 2019-02-25 2018-10-23 2019-09-05 2018-11-27 2023-11-26 Institutional Capacity Envelope e-Governance Solution on IN-AS-CFMS-57404-GO-RFB / CoE: NCB for Supply of Computers, Network Hardware and Peripherals, Strengthening Public Finance Single Stage - Two IBRD / 87650 Post Request for Bids Open - National 550,000.00 0.00 Canceled 2018-04-30 2018-05-25 2018-05-05 2018-07-11 2018-06-16 2018-08-29 2018-10-03 2024-04-04 Including the Work of Power Institutional Capacity Envelope Supply, LAN, and Network Cabling at the Commissionerate of Excise, Assam IN-AS-CFMS-74725-GO-APA Strengthening Expenditure Request for Single Stage - One / CoE: Purchase of Laptops on IBRD / 87650 and Revenue Information Post Open - National 99,000.00 100,103.73 Signed 2018-08-29 2018-10-24 2018-11-22 2018-12-23 Quotations Envelope GeM Systems IN-AS-CFMS-74744-GO-RFQ Strengthening Expenditure Pending Request for Single Stage - One / CoE: Purchase of Desktops, IBRD / 87650 and Revenue Information Post Open - National 54,000.00 0.00 Implementati 2018-09-01 2018-10-27 2018-12-26 Quotations Envelope UPS and Printers on GeM Systems on IN-AS-CFMS-93284-GO-RFQ Project Management, Pending / Heating, ventilation and Air Request for Single Stage - One IBRD / 87650 Monitoring & Evaluation and Post Limited 45,000.00 0.00 Implementati 2019-02-16 2019-04-13 2019-06-12 Conditioning at new Office Quotations Envelope Coordination on Space Of ASPIRe IN-AS-CFMS-108496-GO- Strengthening Expenditure Under DIR / System Integrator for IBRD / 87650 and Revenue Information Prior Direct Selection Direct 3,000,000.00 0.00 Implementati 2019-04-11 2019-09-05 2019-04-16 2019-09-12 2019-05-21 2024-05-19 FMIS Solution Development Systems on IN-AS-CFMS-52090-GO-RFB / National Competitive Strengthening Expenditure Single Stage - Two Bidding for Supply of Network IBRD / 87650 and Revenue Information Post Request for Bids Open - National 500,000.00 0.00 Canceled 2018-03-19 2018-03-24 2018-05-05 2018-07-18 2018-08-22 2023-08-21 Envelope Hardware at the Directorate of Systems Accounts and Treasuries IN-AS-CFMS-124299-GO- Strengthening Expenditure Pending Request for Single Stage - One RFQ / Procurement of 13 IBRD / 87650 and Revenue Information Post Open - National 34,200.00 0.00 Implementati 2019-08-18 2019-10-13 2024-10-11 Quotations Envelope Remote Routers for Treasuries Systems on IN-AS-CFMS-124696-GO- Pending Strengthening Public Finance DIR / Development of State IBRD / 87650 Post Direct Selection Direct 700,000.00 0.00 Implementati 2019-08-25 2019-08-30 2019-10-04 2022-10-03 Institutional Capacity Public Procurement Portal on IN-AS-CFMS-125202-GO- Strengthening Expenditure Pending RFQ / Procurement of SSL Request for Single Stage - One IBRD / 87650 and Revenue Information Post Open - National 11,000.00 0.00 Implementati 2019-08-09 2019-10-04 2019-11-03 Certificates for Mission Quotations Envelope Systems on Critical Applications IN-AS-CFMS-125211-GO- Strengthening Expenditure Pending RFQ / 61 Layer 2 Managed Request for Single Stage - One IBRD / 87650 and Revenue Information Post Open - National 100,000.00 0.00 Implementati 2019-08-05 2019-09-30 2019-12-29 Switches (48 ports) for Quotations Envelope Systems on Treasuries IN-AS-CFMS-126763-GO- Strengthening Expenditure Pending Single Stage - Two RFB / Network equipment of IBRD / 87650 and Revenue Information Post Request for Bids Open - National 660,000.00 0.00 Implementati 2019-08-26 2019-08-31 2019-10-12 2019-12-25 2020-01-29 2025-01-27 Envelope DoAT Data Center Systems on IN-AS-CFMS-133239-GO- Project Management, Pending Request for Single Stage - One RFQ / Procurement of IT items IBRD / 87650 Monitoring & Evaluation and Post Open - National 36,000.00 0.00 Implementati 2019-09-16 2019-11-11 2020-05-09 Quotations Envelope for office space of ASPIRe Coordination on IN-AS-CFMS-133246-GO- Strengthening Expenditure Pending RFB / Procurement of 100 Request for Single Stage - One IBRD / 87650 and Revenue Information Post Limited 70,000.00 0.00 Implementati 2019-11-07 2020-01-02 2020-06-30 desktop computers for 16 Quotations Envelope Systems on new Treasuries, DoAT IN-AS-CFMS-141680-GO- Pending RFQ / Procurement of 30 Strengthening Public Finance Request for Single Stage - One IBRD / 87650 Post Limited 26,000.00 0.00 Implementati 2019-11-20 2020-01-15 2020-07-13 Laptops for the Training Institutional Capacity Quotations Envelope on Room at ASPIRe Office. IN-AS-CFMS-144431-GO- RFQ / Procurement of 35 nos. Strengthening Expenditure Pending Request for Single Stage - One of printer and 35 nos. of IBRD / 87650 and Revenue Information Post Limited 87,000.00 0.00 Implementati 2019-11-25 2020-01-20 2020-07-18 Quotations Envelope Scanner for Directorate of Systems on Audit (Local Fund) IN-AS-CFMS-144442-GO- RFQ / Procurement of 35 Strengthening Expenditure Pending Request for Single Stage - One Desktops and 100 UPS, for IBRD / 87650 and Revenue Information Post Limited 39,000.00 0.00 Implementati 2019-11-25 2020-01-20 2020-07-18 Quotations Envelope Directorate of Audit (Local Systems on Fund) IN-AS-CFMS-144453-GO- Strengthening Expenditure Pending RFQ / Procurement of 179 Single Stage - One IBRD / 87650 and Revenue Information Post Request for Bids Open - National 166,000.00 0.00 Implementati 2019-11-29 2019-12-04 2020-01-15 2020-02-14 2020-03-20 2020-09-16 Laptops for Directorate of Envelope Systems on Audit (Local Fund) IN-AS-CFMS-159875-GO- RFQ / Procurement of 30 Strengthening Public Finance Request for Single Stage - One Laptop and 10 Desktop for IBRD / 87650 Post Open - National 37,000.00 35,429.96 Signed 2020-02-25 2020-04-21 2020-05-04 2020-10-18 Institutional Capacity Quotations Envelope Finance Department Officials through GeM Page 2 IN-AS-CFMS-160355-GO- RFB / Procurement of 200 Strengthening Expenditure Pending Desktops, 200 Tablets, 60 Single Stage - Two IBRD / 87650 and Revenue Information Post Request for Bids Open - National 252,000.00 0.00 Implementati 2020-02-21 2020-02-26 2020-04-08 2020-06-21 2020-07-26 2021-01-22 Laser Printers and 200 Envelope Systems on Antivirus units for Directorate of Economics & Statistics IN-AS-CFMS-160374-GO- Strengthening Expenditure Pending RFQ / Procurement of 40 nos. Request for Single Stage - One IBRD / 87650 and Revenue Information Post Limited 9,700.00 0.00 Implementati 2020-02-29 2020-04-25 2020-10-22 of tablets, 500 pendrives and Quotations Envelope Systems on 150 Budget Bags for e-budget IN-AS-CFMS-171726-GO- RFB / RFP for SUPPLY OF COMPUTER, NETWORK Strengthening Expenditure Pending HARDWARE AND ITS Single Stage - Two IBRD / 87650 and Revenue Information Post Request for Bids Open - National 1,700,000.00 0.00 Implementati 2020-06-21 2020-06-26 2020-08-07 2020-10-20 2020-11-24 2025-11-23 PERIPHERALS, INCLUDING THE Envelope Systems on WORK OF POWER SUPPLY, UPS AND NETWORK CABLING AT VARIOUS TREASURY OFFICES IN-AS-CFMS-184736-GO- RFQ / Procurement of 50 All- Strengthening Expenditure Pending in-One Desktops, 30 Network Request for Single Stage - One IBRD / 87650 and Revenue Information Post Limited 86,000.00 0.00 Implementati 2020-08-04 2020-09-29 2021-03-28 Printers, and 50 UPS for Quotations Envelope Systems on Kamrup Rural district for implementation of FMIS IN-AS-CFMS-196774-GO- Strengthening Expenditure Under Single Stage - Two RFB / Procurement of IBRD / 87650 and Revenue Information Post Request for Bids Open - National 515,000.00 0.00 Implementati 2020-10-20 2020-10-25 2020-12-06 2021-02-18 2021-03-25 2023-03-25 Envelope Hardware for GST Prime Systems on IN-AS-CFMS-200079-GO- RFQ / Procurement of 50 Laptops, 5 Multi Function Pending Printers, 10 Desktops , 5 Strengthening Public Finance Request for Single Stage - One IBRD / 87650 Post Open - National 100,000.00 0.00 Implementati 2020-11-04 2020-12-30 2021-06-28 Photocopier Machines and Institutional Capacity Quotations Envelope on Cartridges and Toners for Finance Department for one Financial Year IN-AS-CFMS-200724-GO- Strengthening Expenditure Pending Request for Single Stage - One RFQ / Procurement of IT IBRD / 87650 and Revenue Information Post Open - National 50,000.00 0.00 Implementati 2020-11-01 2020-12-27 2021-06-25 Quotations Envelope Hardware for FMIS Helpdesk Systems on IN-AS-CFMS-200726-GO- Strengthening Expenditure Pending RFQ / Procurement of Chairs Request for Single Stage - One IBRD / 87650 and Revenue Information Post Open - National 7,200.00 0.00 Implementati 2020-11-01 2020-12-27 2021-06-25 and Conference table for FMIS Quotations Envelope Systems on Team IN-AS-CFMS-200732-GO- Strengthening Expenditure Pending RFQ / Procurement of IT Request for Single Stage - One IBRD / 87650 and Revenue Information Post Open - National 15,000.00 0.00 Implementati 2020-11-02 2020-12-28 2021-06-26 Hardware for Chief Secretary Quotations Envelope Systems on Monitoring Cell IN-AS-CFMS-200739-GO- Pending Strengthening Public Finance Single Stage - Two APA / Procurement of AC for IBRD / 87650 Post Request for Bids Open - National 103,000.00 0.00 Implementati 2020-11-02 2020-11-07 2020-12-19 2021-03-03 2021-04-07 2021-10-04 Institutional Capacity Envelope Finance Department on IN-AS-CFMS-200172-GO- DIR / DSC Public Key Strengthening Expenditure Pending Infrastructure and Document IBRD / 87650 and Revenue Information Post Direct Selection Direct 68,000.00 0.00 Implementati 2020-11-30 2020-12-14 2021-01-18 2022-01-18 Signer Certificate for Tax Systems on Officers IN-AS-CFMS-206383-GO- Strengthening Expenditure Pending DIR / Oracle Perpetual IBRD / 87650 and Revenue Information Post Direct Selection Direct 358,500.00 0.00 Implementati 2020-12-04 2020-12-09 2021-01-13 2022-01-13 Licenses for Excise e- Systems on Governance Solution IN-AS-CFMS-208626-GO- RFQ / Procurement of 60 Pending Desktops and One Online UPS Strengthening Public Finance Request for Single Stage - One IBRD / 87650 Post Open - National 65,000.00 0.00 Implementati 2021-02-16 2021-04-13 2021-10-10 for Computer Training Institutional Capacity Quotations Envelope on Laboratory at Kamrup DC Office IN-AS-CFMS-221734-GO- Strengthening Expenditure Pending DIR / Procurement of Oracle IBRD / 87650 and Revenue Information Post Direct Selection Direct 7,700.00 0.00 Implementati 2021-02-25 2021-03-02 2021-04-06 2021-10-03 Linux Virtualisation Manager Systems on IN-AS-CFMS-225784-GO- RFB / Procurement of 204 all- in-one desktops, 8 laptops, Strengthening Expenditure Pending 86 Laserjet Printers, 4 nos. Single Stage - Two IBRD / 87650 and Revenue Information Post Request for Bids Open - National 270,000.00 0.00 Implementati 2021-04-01 2021-04-06 2021-05-18 2021-07-31 2021-09-04 2022-09-04 line printer, 2 nos. 2 nos. of 3 Envelope Systems on KVA UPS and one IM Server for the Office of the Accountant General IN-AS-CFMS-226384-GO- RFQ / Procurement of 40 Pending Strengthening Public Finance Request for Single Stage - One Desktops & 2 10 KV UPS for IBRD / 87650 Post Open - National 42,000.00 0.00 Implementati 2021-04-23 2021-06-18 2021-12-15 Institutional Capacity Quotations Envelope IFMIS Training Room of on Finance Department NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Expenditure IN-AS-CFMS-41198-NC-DIR IBRD / 87650 and Revenue Information Post Direct Selection Direct 5,000.00 0.00 Canceled 2017-12-29 2018-01-03 2018-02-07 2018-05-08 / Security Audit for eGRAS Systems IN-AS-CFMS-108300-NC- Pending Strengthening Public Finance Request for Single Stage - One RFQ / AMC of IT equipment of IBRD / 87650 Post Open - National 29,000.00 0.00 Implementati 2019-06-15 2019-08-10 2020-08-09 Institutional Capacity Quotations Envelope Finance Department on Page 3 IN-AS-CFMS-112298-NC- Project Management, Pending RFQ / Facility Management Request for Single Stage - One IBRD / 87650 Monitoring & Evaluation and Post Open - National 40,000.00 0.00 Implementati 2019-06-15 2019-08-10 2020-08-09 Services for New Office Space Quotations Envelope Coordination on (Kamakhya Tower) IN-AS-CFMS-118791-NC- Project Management, Request for Single Stage - One RFQ / Hiring 2 pool cars for IBRD / 87650 Monitoring & Evaluation and Post Open - National 29,000.00 18,632.67 Signed 2019-07-03 2019-08-28 2020-02-17 2020-08-27 Quotations Envelope AS-CFMS Coordination IN-AS-CFMS-120389-NC- Strengthening Expenditure Single Stage - Two RFB / Engagement of a Cloud IBRD / 87650 and Revenue Information Post Request for Bids Open - National 575,000.00 536,317.50 Signed 2019-08-01 2019-11-11 2019-08-06 2019-09-17 2020-01-24 2019-11-30 2020-04-28 2020-01-04 2020-08-03 2022-01-03 Envelope Services Provider for AS-CFMS Systems IN-AS-CFMS-150672-NC- RFB / Alternate Network Strengthening Expenditure Single Stage - One Connectivity at the Treasuries IBRD / 87650 and Revenue Information Prior Request for Bids Open - National 2,140,300.00 0.00 Canceled 2020-01-20 2020-04-02 2020-01-25 2020-06-09 2020-03-07 2020-06-22 2020-04-06 2020-05-11 2025-05-10 Envelope and Taxation Offices across Systems Assam IN-AS-CFMS-157415-NC- DIR / Design & Development Strengthening Expenditure of an Open-Source IBRD / 87650 and Revenue Information Post Direct Selection Direct 150,000.00 0.00 Canceled 2020-02-04 2020-02-09 2020-03-15 2021-01-09 Technology Platform Systems Providing Scheme Registry and Citizen Access Services IN-AS-CFMS-196355-NC- RFQ / Annual Maintenance Project Management, Pending Contract (AMC) and Facility Request for Single Stage - One IBRD / 87650 Monitoring & Evaluation and Post Open - National 73,000.00 0.00 Implementati 2020-10-05 2020-11-30 2022-11-30 Management Services (FMS) in Quotations Envelope Coordination on Finance Department and ASPIRe office IN-AS-CFMS-196778-NC- RFB / Procurement of Strengthening Expenditure Under Single Stage - Two Alternate Connectivity IBRD / 87650 and Revenue Information Post Request for Bids Open - National 700,000.00 0.00 Implementati 2020-10-09 2021-04-09 2020-10-14 2021-04-12 2020-11-03 2021-01-16 2021-02-20 2026-02-19 Envelope Services for Treasury and Systems on Taxation offices across Assam IN-AS-CFMS-203114-NC- Project Management, Pending RFQ / Facility Management Request for Single Stage - One IBRD / 87650 Monitoring & Evaluation and Post Open - National 30,000.00 0.00 Implementati 2020-11-13 2021-01-08 2023-01-08 Services for New Office space( Quotations Envelope Coordination on Kamakhya Tower) IN-AS-CFMS-225815-NC- RFQ / Hiring of Service Pending Strengthening Public Finance Request for Single Stage - One Provider for Regional IBRD / 87650 Post Open - National 6,500.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 Institutional Capacity Quotations Envelope Language Translation on Services. IN-AS-CFMS-225813-NC- RFQ / Hiring of Service Pending Strengthening Public Finance Request for Single Stage - One Provider for Providing IBRD / 87650 Post Open - National 17,200.00 0.00 Implementati 2021-03-27 2021-05-22 2023-05-22 Institutional Capacity Quotations Envelope Videography and related on services. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-AS-CFMS-4524-CS-QCBS / Selection of Consultants for consultancy services for Strengthening Expenditure Quality And Cost- Under designing an e-Governance / and Revenue Information Post Open - National 148,236.00 0.00 2016-12-13 2016-02-03 2016-12-13 2016-12-13 2016-06-15 2016-12-13 2016-12-13 2016-12-13 2016-12-21 2017-01-17 2018-01-17 Based Selection Implementation system for the Department of Systems Excise, Government of Assam, India. IN-AS-CFMS-4525-CS-QCBS / Selection of Consultants for consultancy services for Strengthening Expenditure Quality And Cost- Under Institutional and GST / and Revenue Information Post Open - National 96,353.39 0.00 2016-12-13 2016-01-29 2016-12-13 2016-12-13 2016-06-15 2016-12-13 2016-07-22 2016-12-13 2016-10-04 2016-12-13 2016-12-02 2017-01-17 2018-01-17 Based Selection Implementation readiness assessment in the Systems Commissionerate of Taxes, Govt. of Assam IN-AS-CFMS-4528-CS-QCBS / Consultancy for Policy and Institutional Reform for Strengthening Public Finance Quality And Cost- Under / Post Open - National 88,941.00 302,641.56 2016-12-14 2016-07-22 2016-12-14 2016-12-14 2016-11-22 2016-12-30 2016-12-30 2017-01-14 2017-02-02 2017-02-18 2017-02-20 2017-03-25 2018-03-25 Strengthening PPP Framework Institutional Capacity Based Selection Implementation and enabling Environment for the Government of Assam IN-AS-CFMS-4483-CS-QCBS / Selection of Consultants for Designing of Financial Strengthening Expenditure Management Information Quality And Cost- Under / and Revenue Information Post Open - National 252,223.90 0.00 2016-12-13 2016-06-01 2016-12-13 2016-12-13 2016-12-13 2016-12-13 2016-12-13 2017-01-03 2018-01-03 System for the Government of Based Selection Implementation Systems Assam and support in selection of the System Integrator IN-AS-CFMS-4579-CS-LCS / Project Management, Least Cost Engaging Chartered / Monitoring & Evaluation and Post Open - National 22,235.40 4,846.94 Signed 2016-12-15 2016-09-29 2016-12-15 2016-12-15 2016-11-22 2016-12-30 2016-12-30 2017-01-29 2017-01-28 2017-02-05 2017-02-17 2017-02-12 2017-02-21 2018-02-12 Selection Accountant for AS-CFMS Coordination IN-AS-CFMS-19057-CS- Project Management, Quality And Cost- QCBS / Communications IBRD / 87650 Monitoring & Evaluation and Post Open - National 50,000.00 49,068.93 Signed 2017-07-14 2017-08-18 2017-08-04 2017-08-21 2017-09-17 2017-11-06 2017-10-15 2017-12-05 2017-11-14 2017-12-20 2017-12-19 2018-01-19 2018-01-23 2018-02-06 2019-01-23 Based Selection Consultant Coordination IN-AS-CFMS-19056-CS-CDS / Solution Provider for BI & Consultant Strengthening Public Finance Analytics Dashboard for the IBRD / 87650 Post Qualification Open - National 90,000.00 75,033.28 Signed 2017-07-28 2017-08-03 2017-08-11 2017-08-30 2017-11-07 2017-09-29 2018-01-10 2017-11-03 2018-04-17 2019-03-08 Institutional Capacity Department of Finance, Selection Government of Assam Page 4 IN-AS-CFMS-20784-CS- QCBS / Consultancy for Policy and Institutional Reform for Strengthening Public Finance Quality And Cost- IBRD / 87650 Post Open - National 100,000.00 61,565.39 Signed 2017-07-28 2016-07-22 2017-07-28 2017-07-28 2016-11-21 2017-07-28 2016-12-30 2017-07-28 2017-02-02 2017-07-28 2017-02-17 2017-07-28 2017-03-29 2017-12-05 Strengthening PPP Framework Institutional Capacity Based Selection & Enabling Environment for the Government of Assam IN-AS-CFMS-68604-CS-CQS Project Management, Consultant Under / Social Media Consultant for IBRD / 87650 Monitoring & Evaluation and Post Qualification Open - National 37,000.00 0.00 2018-08-08 2018-08-29 2018-10-12 2019-01-22 2018-11-11 2018-12-16 2019-12-16 Implementation AS-CFMS Coordination Selection IN-AS-CFMS-68680-CS-CQS Project Management, Consultant / Independent Verification IBRD / 87650 Monitoring & Evaluation and Post Qualification Open - National 120,000.00 181,893.87 Signed 2018-07-18 2018-08-29 2018-08-08 2018-09-21 2018-11-08 2018-10-21 2018-11-29 2018-11-25 2018-11-29 2023-11-24 Agency Coordination Selection IN-AS-CFMS-75908-CS-CQS Project Management, Consultant / Hiring a Statutory Auditor IBRD / 87650 Monitoring & Evaluation and Post Qualification Open - National 1,000.00 2,451.98 Signed 2018-08-30 2018-09-06 2018-09-20 2018-11-03 2018-11-14 2018-12-03 2018-12-10 2019-01-07 2018-12-10 2019-07-06 for AS-CFMS Coordination Selection IN-AS-CFMS-92282-CS- Strengthening Public Finance Quality And Cost- QCBS / Data Analytics Centre IBRD / 87650 Post Open - International 430,000.00 165,677.72 Signed 2019-01-18 2019-03-08 2019-02-08 2019-03-14 2019-03-24 2019-06-12 2019-04-21 2019-07-25 2019-05-21 2019-09-17 2019-06-25 2019-10-15 2019-07-30 2019-11-25 2022-07-29 Institutional Capacity Based Selection under AS-CFMS IN-AS-CFMS-107714-CS- QCBS / PMC for the e- Strengthening Expenditure Governance Project at Quality And Cost- IBRD / 87650 and Revenue Information Post Open - National 386,000.00 0.00 Canceled 2019-04-25 2019-05-16 2019-06-29 2019-07-27 2019-08-26 2019-09-30 2019-11-04 2021-05-05 Commissionerate of Excise, Based Selection Systems Assam, under ASPIRe Project, Government of Assam IN-AS-CFMS-108501-CS-UN / Consultancy Support for Strengthening Public Finance UN Agencies IBRD / 87650 Post Direct 700,000.00 0.00 Canceled 2019-06-04 2021-06-03 State Procurement Facilitation Institutional Capacity (Direct) Cell IN-AS-CFMS-109761-CS-UN / Consultancy Support to Strengthening Public Finance UN Agencies Pending IBRD / 87650 Post Direct 900,000.00 0.00 2019-08-19 2021-08-18 State Procurement Facilitation Institutional Capacity (Direct) Implementation Cell IN-AS-CFMS-92279-CS- Strengthening Expenditure QCBS / Project Management Quality And Cost- IBRD / 87650 and Revenue Information Post Open - National 286,000.00 0.00 Canceled 2019-01-18 2019-02-08 2019-03-24 2019-04-21 2019-05-21 2019-06-25 2019-07-30 2021-07-29 Consultancy for Infrastructure Based Selection Systems Upgradation in the Treasuries IN-AS-CFMS-125213-CS- QCBS / Consultancy for Strengthening Public Finance Quality And Cost- Pending Designing Work-flow Based IBRD / 87650 Post Open - National 120,000.00 0.00 2019-08-04 2019-08-25 2019-10-08 2019-11-05 2019-12-05 2020-01-09 2020-02-13 2021-02-12 Institutional Capacity Based Selection Implementation Ergonomic Interiors for Treasuries IN-AS-CFMS-134637-CS- QCBS / PMC for FMIS Strengthening Expenditure Quality And Cost- Pending Implementation for Finance IBRD / 87650 and Revenue Information Post Open - National 430,000.00 0.00 2019-09-27 2019-10-18 2019-12-01 2019-12-29 2020-01-28 2020-03-03 2020-04-07 2023-04-07 Based Selection Implementation Department, Government of Systems Assam IN-AS-CFMS-135145-CS- QCBS / Consultant Firm for Project Management, Quality And Cost- Revenue Augmentation in the IBRD / 87650 Monitoring & Evaluation and Post Open - National 610,000.00 177,893.83 Signed 2019-09-29 2019-11-20 2019-10-20 2021-03-22 2019-12-03 2020-02-04 2019-12-31 2020-05-04 2020-01-30 2020-10-05 2020-03-05 2020-12-08 2020-04-09 2021-01-27 2022-04-09 Based Selection State of Assam across four Coordination departments IN-AS-CFMS-139821-CS- Strengthening Expenditure QCBS / Selection of a Systems Quality And Cost- IBRD / 87650 and Revenue Information Prior Open - International 3,000,000.00 1,371,247.88 Signed 2019-10-17 2019-10-21 2019-11-07 2019-11-29 2019-12-21 2020-03-19 2020-01-18 2020-06-08 2020-02-17 2020-07-17 2020-03-23 2020-09-21 2020-04-27 2020-12-03 2021-04-27 Integrator for DBT Digital Based Selection Systems Infrastructure IN-AS-CFMS-141006-CS- QCBS / Excise Consultancy for Strengthening Expenditure Training Content Quality And Cost- Under IBRD / 87650 and Revenue Information Post Open - National 500,000.00 0.00 2019-10-24 2019-11-08 2019-11-14 2019-12-28 2020-01-13 2020-01-25 2020-02-25 2020-02-24 2020-03-11 2020-03-30 2020-05-04 2022-05-04 Development, Project Based Selection Implementation Systems Management and other services. IN-AS-CFMS-160353-CS- QCBS / Selection of a Firm for Strengthening Public Finance Quality And Cost- IBRD / 87650 Post Open - National 60,000.00 0.00 Canceled 2020-02-20 2020-03-12 2020-04-25 2020-05-23 2020-06-22 2020-07-27 2020-08-31 2021-03-29 Developing Assamese Institutional Capacity Based Selection Language Translation Tool IN-AS-CFMS-166046-CS- Consultant QCBS / Selection of a Firm for Strengthening Public Finance Pending IBRD / 87650 Post Qualification Open - National 60,000.00 0.00 2020-03-27 2020-04-17 2020-05-31 2020-06-30 2020-08-04 2021-01-31 Developing Assamese Institutional Capacity Implementation Selection Language Translation Tool IN-AS-CFMS-171552-CS-FBS Project Management, / CA firm for Internal Financial Fixed Budget Under IBRD / 87650 Monitoring & Evaluation and Post Open - National 15,000.00 0.00 2020-05-17 2020-05-29 2020-06-07 2020-07-21 2020-08-18 2020-09-17 2020-10-22 2020-11-26 2022-11-26 Management and Reporting of Selection Implementation Coordination AS-CFMS IN-AS-CFMS-171727-CS-FBS Project Management, Fixed Budget Under / Statutory Auditor for AS- IBRD / 87650 Monitoring & Evaluation and Post Open - National 12,000.00 0.00 2020-05-24 2020-05-20 2020-06-14 2020-07-28 2020-08-25 2020-09-24 2020-10-29 2020-12-03 2023-12-03 Selection Implementation CFMS Coordination IN-AS-CFMS-193877-CS- Strengthening Expenditure Consultant Pending CQS / PMC for Oversight of IBRD / 87650 and Revenue Information Post Qualification Open - National 285,000.00 0.00 2020-09-20 2020-10-05 2020-11-18 2020-12-18 2021-01-22 2023-01-22 Implementation DBT Solution Development Systems Selection IN-AS-CFMS-196354-CS- Strengthening Expenditure QCBS / HIRING OF A Quality And Cost- Pending IBRD / 87650 and Revenue Information Post Open - National 140,000.00 0.00 2020-09-28 2020-10-19 2020-10-30 2020-11-27 2020-12-04 2020-12-15 2021-01-12 2023-01-12 COMMUNICATION AGENCY Based Selection Implementation Systems FOR AS-CFMS IN-AS-CFMS-203115-CS- CQS / Design and Consultant Strengthening Public Finance Development of MOOC Portal IBRD / 87650 Post Qualification Open - National 300,000.00 203,781.05 Signed 2020-11-06 2020-11-17 2020-11-27 2021-01-10 2020-12-29 2021-02-09 2021-02-25 2021-03-16 2021-03-19 2021-05-05 Institutional Capacity for Procurement Capacity Selection Building Page 5 IN-AS-CFMS-217271-CS- Strengthening Expenditure Consultant Under CQS / Security Auditor for IBRD / 87650 and Revenue Information Post Qualification Open - National 280,000.00 0.00 2021-02-16 2021-03-07 2021-03-09 2021-04-08 2021-04-22 2021-05-22 2021-06-26 2024-06-25 Implementation FMIS and DIDS Systems Systems Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-AS-CFMS-4567-CS-INDV Individual / Consultant for study of the Strengthening Public Finance Under / Post Consultant Direct 14,823.60 0.00 2016-12-14 2015-06-25 2016-12-14 2016-10-05 2016-12-14 2016-10-05 2016-12-14 2017-01-31 implementation & scale up of Institutional Capacity Implementation Selection e-procurement in Assam IN-AS-CFMS-4568-CS-INDV Project Management, Individual Under / Hiring of a short term Senior / Monitoring & Evaluation and Post Consultant Direct 10,376.51 0.00 2016-12-14 2016-08-10 2016-12-14 2016-12-14 2016-12-14 2017-03-31 Implementation Procurement Consultant Coordination Selection IN-AS-CFMS-5689-CS-INDV Individual Strengthening Public Finance Pending / ADVISOR - DEBT AND CASH / Post Consultant Direct 41,500.00 0.00 2017-01-30 2017-01-30 2017-01-30 2017-02-09 2018-02-09 Institutional Capacity Implementation MANAGEMENT Selection IN-AS-CFMS-5710-CS-INDV Strengthening Expenditure Individual Pending / DoAT Short term / and Revenue Information Post Consultant Open 65,000.00 0.00 2017-02-15 2017-04-15 2017-05-06 2017-05-28 2019-05-27 Implementation Programmers/ DBA (2 years) Systems Selection IN-AS-CFMS-5711-CS-INDV Strengthening Expenditure Individual Pending / CTD Short term / and Revenue Information Post Consultant Open 65,000.00 0.00 2017-01-17 2017-03-07 2017-03-28 2017-05-02 2019-05-02 Implementation Programmers/ DBA (2 years) Systems Selection IN-AS-CFMS-15352-CS- Project Management, Individual INDV / Procurement Support / Monitoring & Evaluation and Post Consultant Direct 24,000.00 44,897.59 Signed 2017-05-17 2017-05-22 2017-05-22 2017-05-25 2017-05-22 2017-05-31 2017-05-31 2017-06-01 2018-04-29 Staff for AS-CFMS Coordination Selection Project Management, Individual IN-AS-CFMS-28106-CS- IBRD / 87650 Monitoring & Evaluation and Post Consultant Open 74,000.00 59,093.72 Signed 2017-09-15 2017-09-26 2017-11-14 2018-05-29 2017-12-05 2018-05-29 2018-01-09 2019-08-01 2020-01-09 INDV / IT Project Manager Coordination Selection IN-AS-CFMS-30917-CS- Strengthening Expenditure Individual Pending INDV / Programmer (NIC IBRD / 87650 and Revenue Information Post Consultant Open 11,600.00 0.00 2017-10-07 2017-11-25 2017-12-16 2018-01-20 2020-01-20 Implementation Pune) for e-GRAS Systems Selection Customization Strengthening Expenditure IN-AS-CFMS-40757-CS-CDS IBRD / 87650 and Revenue Information Post Direct Selection Direct 5,000.00 0.00 Canceled 2017-12-30 2018-01-09 2018-03-15 2018-06-13 / Security Audit of e-GRAS Systems IN-AS-CFMS-40769-CS- Project Management, Individual Under INDV / eProcurement Project IBRD / 87650 Monitoring & Evaluation and Post Consultant Direct 11,000.00 0.00 2017-12-26 2018-01-05 2018-01-26 2018-03-02 2019-03-02 Implementation Manager Coordination Selection Individual IN-AS-CFMS-41230-CS- Strengthening Public Finance Under IBRD / 87650 Post Consultant Direct 11,000.00 0.00 2017-12-27 2018-01-06 2018-01-27 2018-03-03 2020-03-02 INDV / GeM Support Staff Institutional Capacity Implementation Selection IN-AS-CFMS-47697-CS- Individual Strengthening Public Finance Pending INDV / Procurement IBRD / 87650 Post Consultant Open 92,400.00 0.00 2018-02-25 2018-04-15 2018-05-06 2018-06-10 2019-06-10 Institutional Capacity Implementation Consultants (3) for CEPPA Selection IN-AS-CFMS-47698-CS- Individual Strengthening Public Finance Pending INDV / Legal Consultant for IBRD / 87650 Post Consultant Open 37,000.00 0.00 2018-02-25 2018-04-15 2018-05-06 2018-06-10 2019-06-10 Institutional Capacity Implementation CEPPA Selection IN-AS-CFMS-47702-CS- Individual INDV / Financial and Contract Strengthening Public Finance Pending IBRD / 87650 Post Consultant Open 37,000.00 0.00 2018-02-25 2018-04-15 2018-05-06 2018-06-10 2019-06-10 Management Consultant for Institutional Capacity Implementation Selection CEPPA IN-AS-CFMS-47703-CS- Individual Strengthening Public Finance Pending INDV / Data Analytics IBRD / 87650 Post Consultant Open 37,000.00 0.00 2018-02-25 2018-04-15 2018-05-06 2018-06-10 2019-06-10 Institutional Capacity Implementation Consultant for CEPPA Selection IN-AS-CFMS-47704-CS- Individual Strengthening Public Finance Under INDV / Junior Procurement IBRD / 87650 Post Consultant Open 65,000.00 0.00 2018-02-25 2018-03-23 2018-04-15 2019-01-30 2018-05-06 2018-06-10 2019-06-10 Institutional Capacity Implementation Consultants (5) for CEPPA Selection IN-AS-CFMS-51610-CS- Individual Strengthening Public Finance Under INDV / e-Procurement IBRD / 87650 Post Consultant Direct 30,000.00 0.00 2018-03-07 2018-03-07 2017-12-16 2018-03-07 2018-03-07 2019-03-07 Institutional Capacity Implementation Support Cell (5 members) Selection IN-AS-CFMS-56872-CS- Strengthening Expenditure Individual Pending INDV / Tester for Assam e- IBRD / 87650 and Revenue Information Post Consultant Limited 5,600.00 0.00 2018-04-10 2018-04-15 2018-05-06 2018-06-10 2019-06-10 Implementation GRAS Systems Selection IN-AS-CFMS-62671-CS- Strengthening Expenditure Individual Pending INDV / Senior Developer for IBRD / 87650 and Revenue Information Post Consultant Open 9,000.00 0.00 2018-05-18 2018-07-06 2018-07-27 2018-08-31 2019-08-31 Implementation DoAT Systems Selection IN-AS-CFMS-64922-CS- Project Management, Individual INDV / Architect cum Interior Under IBRD / 87650 Monitoring & Evaluation and Post Consultant Open 13,000.00 0.00 2018-06-15 2018-08-03 2018-08-24 2018-09-28 2019-06-25 Designer for Furnishing Office Implementation Coordination Selection Space for ASPIRe Project IN-AS-CFMS-68598-CS- Individual Strengthening Public Finance Pending INDV / GeM Support Staff (2 IBRD / 87650 Post Consultant Open 45,000.00 0.00 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2021-11-11 Institutional Capacity Implementation persons) Selection IN-AS-CFMS-65782-CS- Individual Strengthening Public Finance INDV / Cash and Debt IBRD / 87650 Post Consultant Direct 9,200.00 5,870.43 Signed 2018-07-25 2018-08-04 2018-08-25 2018-09-29 2018-09-01 2019-09-29 Institutional Capacity Management Assistant Selection IN-AS-CFMS-72647-CS- Project Management, Individual Under INDV / Human Resources IBRD / 87650 Monitoring & Evaluation and Post Consultant Open 50,000.00 0.00 2018-08-17 2018-10-05 2018-10-26 2018-11-30 2023-11-29 Implementation Manager for AS-CFMS Coordination Selection Page 6 IN-AS-CFMS-74776-CS- Individual INDV / Director (Training), Strengthening Public Finance Pending IBRD / 87650 Post Consultant Open 37,000.00 0.00 2018-08-29 2018-10-31 2018-11-21 2018-12-26 2019-12-26 State Institute of Public Institutional Capacity Implementation Selection Finance, Assam Individual IN-AS-CFMS-83273-CS- Strengthening Public Finance Under IBRD / 87650 Post Consultant Open 11,000.00 0.00 2018-11-16 2019-01-04 2019-01-25 2019-03-01 2020-02-29 INDV / Business Analyst Institutional Capacity Implementation Selection IN-AS-CFMS-83274-CS- Individual Strengthening Public Finance Under INDV / Senior Business IBRD / 87650 Post Consultant Open 15,500.00 0.00 2018-11-16 2019-01-04 2019-01-25 2019-03-01 2020-02-29 Institutional Capacity Implementation Analyst Selection IN-AS-CFMS-85396-CS- Strengthening Expenditure Individual INDV / Technical Support Pending IBRD / 87650 and Revenue Information Post Consultant Direct 17,500.00 0.00 2018-11-16 2018-11-26 2018-12-17 2019-01-21 2019-07-20 Personnel for CTMIS (3 Implementation Systems Selection persons) IN-AS-CFMS-92274-CS- Strengthening Expenditure Individual Pending INDV / IT Expert for technical IBRD / 87650 and Revenue Information Post Consultant Direct 3,650.00 0.00 2018-12-28 2019-01-07 2019-01-28 2019-03-04 2019-06-02 Implementation evaluation of FinAssam Systems Selection Project Management, Individual IN-AS-CFMS-93309-CS- Pending IBRD / 87650 Monitoring & Evaluation and Post Consultant Open 12,000.00 0.00 2019-01-25 2019-03-15 2019-04-05 2019-05-10 2020-05-09 INDV / Content Writer Implementation Coordination Selection IN-AS-CFMS-96331-CS- Strengthening Expenditure Individual INDV / Domain Expert - Pending IBRD / 87650 and Revenue Information Post Consultant Direct 2,200.00 0.00 2019-01-31 2019-02-10 2019-03-03 2019-04-07 2019-07-06 Financial Rules & Regulations Implementation Systems Selection (Treasury) IN-AS-CFMS-96332-CS- Strengthening Expenditure Individual INDV / Domain Expert - Pending IBRD / 87650 and Revenue Information Post Consultant Direct 2,200.00 0.00 2019-01-31 2019-02-10 2019-03-03 2019-04-07 2019-07-06 Financial Rules & Regulations Implementation Systems Selection (Pension) IN-AS-CFMS-96334-CS- Strengthening Expenditure Individual INDV / Domain Expert - Pending IBRD / 87650 and Revenue Information Post Consultant Direct 2,200.00 0.00 2019-01-31 2019-02-10 2019-03-03 2019-04-07 2019-07-06 Financial Rules & Regulations Implementation Systems Selection (Audit L/F) IN-AS-CFMS-96335-CS- Project Management, Individual Pending INDV / Visual Design IBRD / 87650 Monitoring & Evaluation and Post Consultant Open 11,000.00 0.00 2019-01-31 2019-03-21 2019-04-11 2019-05-16 2019-11-12 Implementation Specialist Coordination Selection IN-AS-CFMS-101120-CS- Individual Strengthening Public Finance Pending INDV / Advisor - Financial IBRD / 87650 Post Consultant Open 26,000.00 0.00 2019-02-28 2019-04-18 2019-05-09 2019-06-13 2020-06-12 Institutional Capacity Implementation Inclusion and DBT Selection IN-AS-CFMS-28107-CS- Strengthening Expenditure Individual INDV / ICT Infrastructure IBRD / 87650 and Revenue Information Post Consultant Open 27,700.00 0.00 Canceled 2017-09-15 2017-11-14 2017-12-05 2018-01-09 2019-01-09 Specialist Systems Selection IN-AS-CFMS-118046-CS- CDS / PMC for the e- Strengthening Expenditure Governance Project at IBRD / 87650 and Revenue Information Post Direct Selection Direct 200,000.00 214,723.19 Signed 2019-06-28 2019-10-24 2019-07-08 2019-10-24 2019-09-11 2020-01-27 2020-03-09 Commissionerate of Taxes, Systems Assam, under ASPIRe Project, Government of Assam IN-AS-CFMS-110931-CS- Individual INDV / Architect for Strengthening Public Finance Pending IBRD / 87650 Post Consultant Open 36,000.00 0.00 2019-06-28 2019-08-16 2019-09-06 2019-10-11 2020-10-10 refurbishment of Finance Institutional Capacity Implementation Selection Department units IN-AS-CFMS-120383-CS- Strengthening Expenditure Pending CDS / Oracle Annual Technical IBRD / 87650 and Revenue Information Post Direct Selection Direct 121,225.00 0.00 2019-06-28 2019-06-28 2019-07-19 2020-03-31 Implementation Support (2019-20) Systems IN-AS-CFMS-120405-CS- Individual Strengthening Public Finance Pending INDV / Junior Cash & Debt IBRD / 87650 Post Consultant Open 12,900.00 0.00 2019-07-19 2019-09-20 2019-10-11 2019-11-15 2020-11-14 Institutional Capacity Implementation Management Consultant Selection IN-AS-CFMS-120410-CS- CDS / Consultancy for Study Strengthening Public Finance Pending IBRD / 87650 Post Direct Selection Direct 75,000.00 0.00 2019-07-26 2019-08-05 2019-10-09 2020-10-08 of State Channelizing Institutional Capacity Implementation Agencies IN-AS-CFMS-123357-CS- Individual Strengthening Public Finance Pending INDV / Consultant for service IBRD / 87650 Post Consultant Limited 7,800.00 0.00 2019-07-21 2019-07-26 2019-08-16 2019-09-20 2020-03-18 Institutional Capacity Implementation sector training under GST Selection IN-AS-CFMS-124291-GO- RFQ / Development of Strengthening Expenditure Under ePPO,eGPO and eCPO in AG IBRD / 87650 and Revenue Information Post Direct Selection Direct 5,000.00 0.00 2019-08-13 2019-08-23 2019-08-23 2019-10-27 2020-10-26 Implementation System for Integration with Systems FinAssam IN-AS-CFMS-129211-CS- CDS / Consultancy for Strengthening Public Finance Under IBRD / 87650 Post Direct Selection Direct 72,000.00 0.00 2019-09-03 2019-11-29 2019-09-13 2019-11-17 2020-11-16 Modernization of the Excise Institutional Capacity Implementation Chemical Lab IN-AS-CFMS-134804-CS- Individual INDV / Director, Training for Strengthening Public Finance Pending IBRD / 87650 Post Consultant Direct 26,000.00 0.00 2019-10-09 2019-10-19 2019-11-09 2019-12-14 2020-12-13 Public Finance Management Institutional Capacity Implementation Selection Institute IN-AS-CFMS-140239-CS- CDS / Consultancy for Bid Project Management, Process Management for IBRD / 87650 Monitoring & Evaluation and Post Direct Selection Direct 57,500.00 68,081.01 Signed 2019-10-25 2019-12-19 2019-11-04 2020-01-14 2020-01-08 2020-02-17 2021-01-07 Digital Infrastructure for DBT Coordination Schemes (DIDS) - SI procurement IN-AS-CFMS-141002-CS- Individual INDV / Banking Sector Strengthening Public Finance Pending IBRD / 87650 Post Consultant Open 20,000.00 0.00 2019-10-21 2019-12-09 2019-12-30 2020-02-03 2021-02-02 Consultant for DBT / Financial Institutional Capacity Implementation Selection Inclusion Page 7 IN-AS-CFMS-145116-CS- Strengthening Expenditure Individual Pending INDV / Hiring of Domain IBRD / 87650 and Revenue Information Post Consultant Direct 11,000.00 0.00 2019-11-15 2019-11-25 2019-12-16 2020-01-20 2020-12-20 Implementation Expert - Audit Systems Selection IN-AS-CFMS-147130-CS- Strengthening Expenditure Individual Pending INDV / Hiring of a Data IBRD / 87650 and Revenue Information Post Consultant Open 90,000.00 0.00 2019-11-30 2020-01-18 2020-02-08 2020-03-14 2023-03-14 Implementation Engineer (Data Analytics) Systems Selection IN-AS-CFMS-157409-CS- Strengthening Expenditure Individual Pending INDV / Hiring of a Technical IBRD / 87650 and Revenue Information Post Consultant Open 144,480.00 0.00 2020-02-05 2020-03-25 2020-04-15 2020-05-20 2023-05-20 Implementation Architect to support the PMU Systems Selection IN-AS-CFMS-157410-CS- Strengthening Expenditure Individual Pending INDV / Hiring of a Technical IBRD / 87650 and Revenue Information Post Consultant Open 108,000.00 0.00 2020-02-05 2020-03-25 2020-04-15 2020-05-20 2023-05-20 Implementation Lead to support the PMU Systems Selection IN-AS-CFMS-166042-CS- CDS / Design & Development of an Open-Source Strengthening Public Finance Pending IBRD / 87650 Post Direct Selection Direct 150,000.00 0.00 2020-03-27 2020-04-06 2020-06-10 2020-12-07 Technology Platform Institutional Capacity Implementation Providing Scheme Registry and Citizen Access Services Strengthening Expenditure Individual IN-AS-CFMS-171862-CS- Pending IBRD / 87650 and Revenue Information Post Consultant Open 15,500.00 0.00 2020-05-17 2020-07-05 2020-07-26 2020-08-30 2021-08-30 INDV / UI / UX Designer Implementation Systems Selection IN-AS-CFMS-171553-CS- Strengthening Public Finance CDS / Engagement of CSI and IBRD / 87650 Post Direct Selection Direct 100,000.00 0.00 Canceled 2020-05-24 2020-06-03 2020-08-07 2022-08-07 Institutional Capacity a Training Partner IN-AS-CFMS-200396-CS- CDS / Engagement of CSI as Strengthening Public Finance IBRD / 87650 Post Direct Selection Direct 106,500.00 79,094.63 Signed 2020-10-22 2020-10-22 2020-11-01 2020-11-13 2020-12-15 2021-03-22 2022-12-15 an IT Skill Enhancement for Institutional Capacity Finance Department IN-AS-CFMS-218512-CS- INDV / Architect cum Civil Strengthening Expenditure Individual Pending Engineer for technical support IBRD / 87650 and Revenue Information Post Consultant Open 20,000.00 0.00 2021-02-17 2021-04-07 2021-04-28 2021-06-02 2021-11-29 Implementation in the refurbishment of the Systems Selection Excise Chemical Laboratory IN-AS-CFMS-232778-CS- CDS / Engagement of Kerala Institute of Local Strengthening Public Finance Under Administration (KILA) for IBRD / 87650 Post Direct Selection Direct 72,000.00 0.00 2021-05-25 2021-05-25 2021-06-04 2021-08-08 2022-08-08 Institutional Capacity Implementation Capacity Building of Directorate of Audit (Local Fund), Assam (DALF) Page 8 PROCUREMENT PLAN (Textual Part)P163742 Project information: [country] [Project name] [P-number]Sri Lanka – Climate Smart Irrigated Agriculture Project – P163742 Project Implementation agency: [insert legal name]Ministry of Agriculture Date of the Procurement Plan: 24 January, 2019[insert date] Period covered by this Procurement Plan: [insert from – to period]24 January - 31 December 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: : In accordance with the Procurement Regulations for IPF Borrowers (July 2016, revised November 2017) (“Procurement Regulations”), when approaching the national market, as agreed in the Procurement Plan tables in STEP, the country’s own procurement procedures may be used. When the Borrower, for the procurement of goods, works and non-consulting services, uses its own national open competitive procurement arrangements as set forth in Sri Lanka’s Procurement Guidelines 2006, such arrangements shall be subject to paragraph 5.4 of the Bank’s Procurement Regulations and the following conditions: 1. Only bidding documents acceptable to the Bank shall be used for all national open competitive procurement. 2. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 3. The eligibility of bidders shall be as defined under Section III of the World Bank Procurement Regulations for IPF Borrowers (Procurement Regulations): accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Sri Lanka : Climate Smart Irrigated Agriculture Project PLAN General Information Country: Sri Lanka Bank’s Approval Date of the Original Procurement Plan: 2021-05-19 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163742 GPN Date: 2020-07-29 Project Name: Climate Smart Irrigated Agriculture Project Loan / Credit No: IDA / 63460 D Executing Agency(ies): isaster Management Centre WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-DMC-235213-GO-RFQ / Under Procurement of beds and Contingent Emergency Request for Single Stage - One IDA / 63460 Post Limited 48,000.00 0.00 Implementati 2021-05-24 2021-07-19 2021-07-22 mattress (single bed 72"x30" Response Quotations Envelope on with mattress) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PROCUREMENT PLAN (Textual Part) Project information: Bosnia and Herzegovina – Real Estate Registration Project (Additional Financing) – P128950 Project Implementation agency: Federal Administration for Geodetic and Real Property Affairs and Republic of Srpska Administration for Geodetic and Property Affairs Date of the Procurement Plan: December 22, 2020 Period covered by this Procurement Plan: January – December 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: Not applicable Works: Not applicable PROCUREMENT Bosnia and Herzegovina : REAL ESTATE REGISTRATION PROJECT PLAN General Information Country: Bosnia and Herzegovina Bank’s Approval Date of the Original Procurement Plan: 2020-12-22 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P128950 GPN Date: 2020-12-29 Project Name: REAL ESTATE REGISTRATION PROJECT Loan / Credit No: IBRD / 90480 F Executing Agency(ies): ederal Administration for Geodetic and Real Property Affairs WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BA-FGA-212516-GO-RFQ- Component B - Real Estate B.2.2.1.3 / Replaceable HW Request for Single Stage - One IBRD / 90480 Registration Infrastructure Post Limited 0.00 Canceled 2021-02-01 2021-05-02 2021-07-01 components required for HW Quotations Envelope Development maintenance - Phase 1 BA-FGA-227681-GO-RFQ- Component B - Real Estate B.2.2.1.3 / Replaceable HW Request for Single Stage - One IBRD / 90480 Registration Infrastructure Post Limited 43,505.18 Signed 2021-04-06 2021-04-16 2021-05-15 2021-05-27 2022-07-31 components required for HW Quotations Envelope Development maintenance BA-FGA-239590-GO-RFQ- Component C - Policy and Under Request for Single Stage - One C.3.2.2.2 / Office supply - IBRD / 90480 institutional development, Post Limited 0.00 Implementati 2021-06-21 2021-06-18 2021-07-09 2022-08-09 Quotations Envelope Phase 1, CY 2021 - C.3.2.2.2 and project management on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BA-FGA-212390-NC-RFQ- A.1.3.1 / Printing of promo Component A - Real Estate Request for Single Stage - One material (brochures, flyers, IBRD / 90480 Registration Data Post Limited 2,644.89 Signed 2021-01-15 2021-01-29 2021-03-31 2021-03-01 2022-07-31 Quotations Envelope posters, and other promo Development mat.) - Phase 1 BA-FGA-212394-NC-RFB- Component A - Real Estate A.2.1.1.1 / Harmonization Single Stage - One IBRD / 90480 Registration Data Post Request for Bids Open - National 778,018.22 Signed 2021-01-07 2021-02-05 2021-01-12 2021-02-05 2021-02-26 2021-03-22 2021-03-10 2021-04-02 2021-04-12 2021-04-21 2021-10-09 data on cadastre and land Envelope Development book - Phase 1 BA-FGA-212457-NC-RFB- A.3.1 / Vectorization and Component A - Real Estate Single Stage - One cadastral database creation IBRD / 90480 Registration Data Post Request for Bids Open - National 123,541.91 Signed 2021-01-07 2021-02-01 2021-01-12 2021-02-02 2021-02-26 2021-03-19 2021-03-05 2021-04-02 2021-04-12 2021-04-21 2021-08-25 Envelope (preparation for REC) - Phase Development 1 BA-FGA-212461-NC-RFB- Component B - Real Estate B.3.2.1 / Cadastral scanning Single Stage - One IBRD / 90480 Registration Infrastructure Post Request for Bids Open - National 41,083.88 Signed 2021-01-07 2021-02-05 2021-01-12 2021-02-05 2021-02-26 2021-03-22 2021-03-05 2021-04-02 2021-04-12 2021-04-29 2021-08-10 and indexing for digital Envelope Development archives - Phase 1 BA-FGA-212703-NC-DIR - A.2.2.2.3.1 / Publishing costs Component A - Real Estate - Official Gazette of B&H, IBRD / 90480 Registration Data Post Direct Selection Direct 2,168.36 Signed 2021-01-07 2021-01-01 2021-01-07 2021-01-04 2021-01-12 2021-01-12 2021-12-31 Official Gazette of Federation Development B&H BA-FGA-212704-NC-DIR- Component A - Real Estate A.2.2.2.3.2 / Publishing costs IBRD / 90480 Registration Data Post Direct Selection Direct 2,168.36 Signed 2021-01-07 2021-01-01 2021-01-07 2021-01-04 2021-01-12 2021-01-12 2021-12-31 - daily newspaper Avaz -roto Development press d.o.o. Sarajevo BA-FGA-212705-NC-DIR- Component A - Real Estate A.2.2.2.3.3 / Publishing costs IBRD / 90480 Registration Data Post Direct Selection Direct 2,168.36 Signed 2021-01-07 2021-01-01 2021-01-07 2021-01-04 2021-01-12 2021-01-12 2021-12-31 - daily newspaper Večernji Development List BA-FGA-213262-NC-DIR- A.2.2.2.5.1 / Delivery cost of Component A - Real Estate Decisions on registrations IBRD / 90480 Registration Data Post Direct Selection Direct 6,040.44 Signed 2021-01-11 2021-01-01 2021-01-12 2020-12-23 2021-02-01 2021-02-01 2022-12-31 (Two posts) - JP BH POŠTA Development d.o.o. Sarajevo BA-FGA-213268-NC-DIR- A.2.2.2.5.2 / Delivery cost of Component A - Real Estate Decisions on registrations IBRD / 90480 Registration Data Post Direct Selection Direct 6,040.44 Signed 2021-01-11 2021-01-01 2021-01-12 2020-12-29 2021-02-01 2021-02-01 2022-12-31 (Two posts) - Hrvatska pošta Development d.o.o. Mostar BA-FGA-236325-NC-RFQ- Component B - Real Estate Pending B.3.3.1 / Indexing of land Request for Single Stage - One IBRD / 90480 Registration Infrastructure Post Limited 0.00 Implementati 2021-06-01 2021-08-10 2022-01-31 registry data for digital Quotations Envelope Development on archives - Phase 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 BA-FGA-227687-CS-CQS- B.1.1.2A / Design for Component B - Real Estate Consultant Under renovation od CO's/LRO's IBRD / 90480 Registration Infrastructure Post Qualification Open - National 0.00 2021-04-01 2021-04-06 2021-04-22 2021-06-07 2021-05-24 2021-05-26 2021-07-07 2022-07-15 Implementation and Supervision of renovation Development Selection works of CO's/LRO's BA-FGA-236340-CS-CQS- C.2.2.1-A.1.2.1 / Project Component A - Real Estate Consultant Public Awareness Campaigne Under IBRD / 90480 Registration Data Post Qualification Open - National 0.00 2021-05-25 2021-05-27 2021-06-09 2021-06-08 2021-07-12 2021-07-26 2021-08-16 2022-07-31 (C.2.2.1) and Media Services Implementation Development Selection (Local Radio and TV) - Phase 1 (A.1.2.1) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BA-FGA-210575-CS-CDS - Component C - Policy and C.3.2.1A.1 / Monitoring and IBRD / 90480 institutional development, Post Direct Selection Direct 9,726.38 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-03-31 Evaluation Specialist and project management BA-FGA-210580-CS-CDS - Component C - Policy and C.3.2.1A.2 / Procurement IBRD / 90480 institutional development, Post Direct Selection Direct 35,632.05 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-03-31 specialist and project management BA-FGA-210581-CS-CDS - Component C - Policy and C.3.2.1A.3 / Administrative IBRD / 90480 institutional development, Post Direct Selection Direct 26,297.43 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-03-31 assistant and project management BA-FGA-210582-CS-CDS - Component C - Policy and C.3.2.1A.4 / Finance IBRD / 90480 institutional development, Post Direct Selection Direct 5,522.07 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-03-31 consultant and project management BA-FGA-210585-CS-CDS - Component C - Policy and C.3.2.1A.5 / Land IBRD / 90480 institutional development, Post Direct Selection Direct 35,632.05 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-03-31 Administration specialist and project management BA-FGA-210592-CS-CDS - Component C - Policy and C.3.2.1A.6 / Cadastre IBRD / 90480 institutional development, Post Direct Selection Direct 35,632.05 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-03-31 specialist and project management Component B - Real Estate BA-FGA-210598-CS-CDS - IBRD / 90480 Registration Infrastructure Post Direct Selection Direct 34,918.01 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-03-31 B.2.1.1A.1 / IT Consultant Development Component A - Real Estate BA-FGA-210600-CS-CDS - IBRD / 90480 Registration Data Post Direct Selection Direct 4,455.31 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-03-31 A.1.1.1A.1 / Social Specialist Development BA-FGA-210601-CS-CDS - Component A - Real Estate A.2.2.2.4A.1 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 6,275.09 Signed 2020-12-17 2020-12-23 2020-12-21 2020-12-22 2021-01-01 2021-01-01 2021-12-31 consultant for delivery of Development decisions on registration BA-FGA-210744-CS-CDS - Component A - Real Estate A.2.2.2.4A.2 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 8,785.12 Signed 2020-12-18 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 consultant for delivery of Development decisions on registration BA-FGA-210745-CS-CDS - Component A - Real Estate A.2.2.2.4A.3 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 consultant for delivery of Development decisions on registration BA-FGA-210746-CS-CDS - Component A - Real Estate A.2.2.2.4A.4 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 7,530.10 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 consultant for delivery of Development decisions on registration BA-FGA-210748-CS-CDS - Component A - Real Estate A.2.2.2.4A.5 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 8,785.12 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 consultant for delivery of Development decisions on registration BA-FGA-210751-CS-CDS - Component A - Real Estate A.2.2.2.4A.6 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 6,275.09 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 consultant for delivery of Development decisions on registration BA-FGA-210754-CS-CDS - Component A - Real Estate A.2.2.2.4A.7 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 8,785.12 Terminated 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 consultant for delivery of Development decisions on registration Component C - Policy and BA-FGA-210755-CS-CDS - IBRD / 90480 institutional development, Post Direct Selection Direct 940.18 Signed 2020-12-18 2020-12-23 2020-12-24 2020-12-22 2021-01-01 2021-01-01 2021-03-31 C.3.2.3.1A.1 / Interpreter and project management BA-FGA-210756-CS-CDS - Component A - Real Estate A.2.2.1A.1 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 7,515.38 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development BA-FGA-210758-CS-CDS - Component A - Real Estate A.2.2.1A.2 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 7,515.38 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development BA-FGA-210759-CS-CDS - Component A - Real Estate A.2.2.1A.3 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 7,515.38 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development BA-FGA-210761-CS-CDS - Component A - Real Estate A.2.2.1A.4 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Terminated 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development Page 2 BA-FGA-210762-CS-CDS - Component A - Real Estate A.2.2.1A.5 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development BA-FGA-210763-CS-CDS - Component A - Real Estate A.2.2.1A.6 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 7,515.38 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development BA-FGA-210764-CS-CDS- Component A - Real Estate A.2.2.1A.7 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Terminated 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development BA-FGA-210765-CS-CDS - Component A - Real Estate A.2.2.1A.8 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 7,521.24 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development BA-FGA-210766-CS-CDS - Component A - Real Estate A.2.2.1A.9 / Temporary Land IBRD / 90480 Registration Data Post Direct Selection Direct 11,273.07 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Registry Assistant Development BA-FGA-210767-CS-CDS- Component A - Real Estate A.2.2.1A.10 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 11,273.07 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210769-CS-CDS- Component A - Real Estate A.2.2.1A.11 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210771-CS-CDS- Component A - Real Estate A.2.2.1A.12 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210774-CS-CDS- Component A - Real Estate A.2.2.1A.13 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210775-CS-CDS- Component A - Real Estate A.2.2.1A.14 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210778-CS-CDS- Component A - Real Estate A.2.2.1A.15 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 12,525.63 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210780-CS-CDS- Component A - Real Estate A.2.2.1A.16 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 12,525.63 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210785-CS-CDS- Component A - Real Estate A.2.2.1A.18 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,131.41 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-210787-CS-CDS - Component A - Real Estate A.2.2.1A.19 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,137.54 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-210790-CS-CDS - Component A - Real Estate A.2.2.1A.21 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,131.41 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-210791-CS-CDS- Component A - Real Estate A.2.2.1A.22 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,137.54 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-210792-CS-CDS - Component A - Real Estate A.2.2.1A.23 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,137.54 Terminated 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-210793-CS-CDS- Component A - Real Estate A.2.2.1A.24 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,137.54 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-210795-CS-CDS - Component A - Real Estate A.2.2.1A.25 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 7,515.38 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210796-CS-CDS- Component A - Real Estate A.2.2.1A.26 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 7,515.38 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210798-CS-CDS- Component A - Real Estate A.2.2.1A.27 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Terminated 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210800-CS-CDS - Component A - Real Estate A.2.2.1A.28 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210801-CS-CDS- Component A - Real Estate A.2.2.1A.29 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210803-CS-CDS- Component A - Real Estate A.2.2.1A.30 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 8,157.61 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210805-CS-CDS - Component A - Real Estate A.2.2.1A.31 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 8,157.61 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210807-CS-CDS - Component A - Real Estate A.2.2.1A.32 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development Page 3 BA-FGA-210808-CS-CDS - Component A - Real Estate A.2.2.1A.33 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210810-CS-CDS - Component A - Real Estate A.2.2.1A.34 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210811-CS-CDS - Component A - Real Estate A.2.2.1A.35 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-18 2020-12-23 2020-12-22 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211121-CS-CDS - Component A - Real Estate A.2.2.1A.36 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 11,295.15 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211122-CS-CDS - Component A - Real Estate A.2.2.1A.37 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 11,295.15 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211124-CS-CDS - Component A - Real Estate A.2.2.1A.38 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 11,295.15 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211126-CS-CDS - Component A - Real Estate A.2.2.1A.39 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 12,525.63 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211127-CS-CDS- Component A - Real Estate A.2.2.1A.40 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 5,010.25 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211132-CS-CDS - Component A - Real Estate A.2.2.1A.42 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211133-CS-CDS - Component A - Real Estate A.2.2.1A.43 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211135-CS-CDS- Component A - Real Estate A.2.2.1A.44 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211137-CS-CDS - Component A - Real Estate A.2.2.1A.45 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211139-CS-CDS - Component A - Real Estate A.2.2.1A.46 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Terminated 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211140-CS-CDS - Component A - Real Estate A.2.2.1A.47 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211141-CS-CDS - Component A - Real Estate A.2.2.1A.48 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211143-CS-CDS - Component A - Real Estate A.2.2.1A.49 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 7,515.38 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211144-CS-CDS - Component A - Real Estate A.2.2.1A.50 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-211149-CS-CDS- Component A - Real Estate A.2.2.1A.51 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-211150-CS-CDS - Component A - Real Estate A.2.2.1A.52 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211153-CS-CDS - Component A - Real Estate A.2.2.1A.53 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 9,394.22 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211154-CS-CDS - Component A - Real Estate A.2.2.1A.54 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211155-CS-CDS - Component A - Real Estate A.2.2.1A.55 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211157-CS-CDS- Component A - Real Estate A.2.2.1A.56 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 12,525.63 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211159-CS-CDS- Component A - Real Estate A.2.2.1A.57 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,131.41 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-211161-CS-CDS- Component A - Real Estate A.2.2.1A.58 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,131.41 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-211162-CS-CDS - Component A - Real Estate A.2.2.1A.59 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,131.41 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development Page 4 BA-FGA-211163-CS-CDS- Component A - Real Estate A.2.2.1A.60 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,131.41 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-211168-CS-CDS- Component A - Real Estate A.2.2.1A.61 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 12,525.63 Terminated 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211169-CS-CDS- Component A - Real Estate A.2.2.1A.62 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 12,469.90 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211170-CS-CDS- Component A - Real Estate A.2.2.1A.63 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 4,987.96 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-211171-CS-CDS - Component A - Real Estate A.2.2.1A.64 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 5,010.25 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-211172-CS-CDS- Component A - Real Estate A.2.2.1A.65 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 3,131.41 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-211174-CS-CDS- Component A - Real Estate A.2.2.1A.66 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211176-CS-CDS- Component A - Real Estate A.2.2.1A.67 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211178-CS-CDS- Component A - Real Estate A.2.2.1A.68 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211180-CS-CDS- Component A - Real Estate A.2.2.1A.69 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Signed 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211181-CS-CDS- Component A - Real Estate A.2.2.1A.70 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 6,262.81 Terminated 2020-12-21 2020-12-23 2020-12-23 2020-12-22 2021-01-01 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-211559-CS-CDS- Component A - Real Estate A.2.2.2.4A.8 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 6,275.09 Signed 2020-12-24 2020-12-29 2020-12-28 2020-12-22 2021-01-01 2021-01-01 2021-07-31 consultant for delivery of Development decisions on registration BA-FGA-211560-CS-CDS- Component A - Real Estate A.2.2.2.4A.9 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 6,275.09 Signed 2020-12-24 2020-12-29 2020-12-28 2020-12-22 2021-01-01 2021-01-01 2021-07-31 consultant for delivery of Development decisions on registration BA-FGA-211875-CS-CDS- Component A - Real Estate A.2.2.2.4A.10 / Individual IBRD / 90480 Registration Data Post Direct Selection Direct 9,412.63 Signed 2020-12-29 2020-12-29 2020-12-30 2020-12-22 2021-01-01 2021-01-01 2021-12-31 consultant for delivery of Development decisions on registrations BA-FGA-212460-CS-INDV- Component B - Real Estate Individual B.1.1.1 / Architect required IBRD / 90480 Registration Infrastructure Post Consultant Limited 21,721.21 Signed 2021-01-06 2021-01-01 2021-01-18 2021-01-28 2021-02-01 2021-02-15 2021-02-18 2021-03-01 2022-07-31 for civil works Development Selection Component A - Real Estate Individual BA-FGA-212495-CS-INDV- IBRD / 90480 Registration Data Post Consultant Limited 27,403.84 Signed 2021-01-06 2021-02-08 2021-01-28 2021-02-25 2021-02-12 2021-03-19 2021-04-01 2021-04-01 2022-07-31 A.1.1.1B / Social Specialist Development Selection BA-FGA-212518-CS-INDV- B.2.2.4 / Feasibility study of Component B - Real Estate Individual new system and software IBRD / 90480 Registration Infrastructure Post Consultant Limited 0.00 Canceled 2021-01-06 2021-02-01 2021-02-21 2021-04-01 2021-09-28 architectures with tehnical Development Selection specifications in accordance with the ICT Strategy BA-FGA-212519-CS-INDV- Component B - Real Estate Individual B.2.2.7 / Cyber security policy IBRD / 90480 Registration Infrastructure Post Consultant Limited 0.00 Canceled 2021-01-07 2021-03-04 2021-03-24 2021-05-03 2021-08-01 and action plan Development Selection BA-FGA-212520-CS-INDV- Component C - Policy and Individual C.3.2.3.1B / Interpreter - IBRD / 90480 institutional development, Post Consultant Limited 6,344.84 Signed 2021-01-07 2021-01-01 2021-01-28 2021-02-25 2021-02-12 2021-03-30 2021-04-01 2021-04-01 2022-07-31 Phase 1 and project management Selection BA-FGA-211131-CS-CDS - Component A - Real Estate A.2.2.1A.41 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 0.00 Canceled 2020-12-21 2020-12-23 2020-12-23 2020-12-30 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-210788-CS-CDS - Component A - Real Estate A.2.2.1A.20 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 0.00 Canceled 2020-12-18 2020-12-23 2020-12-22 2020-12-30 2021-01-01 2021-07-31 Land Registry Assistant Development BA-FGA-210782-CS-CDS- Component A - Real Estate A.2.2.1A.17 / Temporary IBRD / 90480 Registration Data Post Direct Selection Direct 0.00 Canceled 2020-12-18 2020-12-23 2020-12-22 2020-12-30 2021-01-01 2021-12-31 Land Registry Assistant Development BA-FGA-218523-CS-INDV- A.4.1.1 / Project managers for Component A - Real Estate Individual Harmonization data on IBRD / 90480 Registration Data Post Consultant Open 70,846.41 Signed 2021-02-11 2021-02-24 2021-03-14 2021-04-12 2021-03-17 2021-04-21 2021-04-21 2021-04-21 2021-11-17 cadastre and land book - Development Selection Phase 1 BA-FGA-212498-CS-INDV- A.4.1.1 / Project managers for Component A - Real Estate Individual Harmonization data on IBRD / 90480 Registration Data Post Consultant Limited 0.00 Canceled 2021-01-06 2021-01-05 2021-02-05 2021-02-20 2021-03-28 2021-10-24 cadastre and land book - Development Selection Phase 1 Page 5 BA-FGA-218764-CS-INDV- A.2.2.1B / Updating Component A - Real Estate Individual (establishment and/or IBRD / 90480 Registration Data Post Consultant Open 82,921.40 Signed 2021-02-12 2021-04-22 2021-03-15 2021-04-15 2021-03-18 2021-04-22 2021-04-01 2021-05-20 2021-12-31 renewal) of land register data Development Selection - Temp LR Assistants BA-FGA-219067-CS-INDV- Component B - Real Estate Individual B.2.1.2 / Technical Assistance IBRD / 90480 Registration Infrastructure Post Consultant Limited 22,570.02 Signed 2021-02-11 2021-02-24 2021-02-17 2021-02-25 2021-03-04 2021-03-30 2021-04-01 2021-04-01 2022-07-31 for QA/QC, ICT Strategy Development Selection update, others BA-FGA-219075-CS-INDV- Component B - Real Estate Individual B.3.1 / Scanning, data entry IBRD / 90480 Registration Infrastructure Post Consultant Limited 52,431.54 Signed 2021-02-11 2021-04-22 2021-02-24 2021-03-24 2021-03-15 2021-05-14 2021-05-01 2021-05-20 2021-12-31 and indexing of LB arhives Development Selection documentation BA-FGA-219077-CS-INDV- Component A - Real Estate Individual A.4.2 / Quality Control - IBRD / 90480 Registration Data Post Consultant Limited 22,570.02 Signed 2021-02-11 2021-02-19 2021-02-19 2021-02-25 2021-03-06 2021-03-30 2021-04-01 2021-04-01 2022-07-31 RECDB Development Selection BA-FGA-219088-CS-INDV- Component C - Policy and Individual Under C.3.2.1B.2 / Monitoring and IBRD / 90480 institutional development, Post Consultant Limited 0.00 2021-02-11 2021-03-09 2021-03-01 2021-03-16 2021-04-01 2022-07-31 Implementation Evaluation Specialist and project management Selection BA-FGA-219100-CS-INDV- Component C - Policy and Individual Pending C.3.2.1B.5 / Finance IBRD / 90480 institutional development, Post Consultant Limited 0.00 2021-02-11 2021-02-28 2021-03-15 2021-04-01 2022-07-31 Implementation consultant and project management Selection BA-FGA-219308-CS-INDV- Component A - Real Estate Individual A.2.2.2.4B / Delivery cost of IBRD / 90480 Registration Data Post Consultant Limited 14,737.47 Signed 2021-02-12 2021-03-09 2021-02-19 2021-03-10 2021-03-06 2021-04-12 2021-04-01 2021-04-15 2021-12-31 Decisions on registrations Development Selection Component C - Policy and Individual BA-FGA-219315-CS-INDV- IBRD / 90480 institutional development, Post Consultant Limited 50,989.22 Signed 2021-02-15 2021-03-09 2021-02-28 2021-03-11 2021-03-15 2021-03-30 2021-04-01 2021-04-01 2022-07-31 C.3.2.1B.1 / Team Leader and project management Selection BA-FGA-212511-CS-INDV- Component B - Real Estate Individual B.2.1.1B / Technical ICT IBRD / 90480 Registration Infrastructure Post Consultant Limited 0.00 Canceled 2021-01-06 2021-01-01 2021-01-28 2021-02-12 2021-04-01 2022-07-31 Assistance for project Development Selection activities BA-FGA-224273-CS-INDV- Component B - Real Estate Individual Under B.2.2.7 / Cyber security policy IBRD / 90480 Registration Infrastructure Post Consultant Open 0.00 2021-03-11 2021-04-05 2021-04-02 2021-04-06 2021-05-03 2021-08-01 Implementation and action plan Development Selection BA-FGA-224275-CS-INDV- B.2.2.4 / Feasibility study of Component B - Real Estate Individual new system and software Under IBRD / 90480 Registration Infrastructure Post Consultant Open 0.00 2021-03-11 2021-04-05 2021-03-28 2021-05-26 2021-03-28 2021-04-01 2021-09-28 architectures with tehnical Implementation Development Selection specifications in accordance with the ICT Strategy BA-FGA-227676-CS-INDV- Component C - Policy and Individual C.3.2.2.5 / Project Controls IBRD / 90480 institutional development, Post Consultant Limited 25,877.56 Signed 2021-04-01 2021-04-06 2021-04-01 2021-04-09 2021-04-16 2021-04-12 2021-04-17 2021-04-19 2022-07-31 and QAQC and project management Selection BA-FGA-233043-CS-INDV- Component A - Real Estate Individual A.2.2.2.4B.VIS1 / Delivery cost IBRD / 90480 Registration Data Post Consultant Limited 3,718.42 Signed 2021-05-04 2021-05-05 2021-05-11 2021-04-30 2021-05-13 2021-05-17 2021-05-20 2021-06-01 2021-12-31 of Decisions on registrations Development Selection - A.2.2.2.4B.VIS1 BA-FGA-235303-CS-INDV- A.2.2.1B / Updating Component A - Real Estate Individual Under (establishment and/or IBRD / 90480 Registration Data Post Consultant Open 0.00 2021-05-20 2021-05-21 2021-07-13 2021-07-15 2021-08-01 2022-07-31 Implementation renewal) of land register data Development Selection - Temp LR Assistants Component A - Real Estate Individual BA-FGA-236315-CS-INDV- IBRD / 90480 Registration Data Post Consultant Limited 24,265.45 Signed 2021-05-25 2021-05-27 2021-05-28 2021-06-01 2021-06-11 2021-06-10 2021-06-15 2021-06-14 2022-07-31 A.1.1.1C / Social Specialist Development Selection Page 6 Jhelum & Tawi Flood Recovery Project (Project ID: P154990) Procurement Summary I. General 1. Project Information: Project Name: Jhelum & Tawi Flood Recovery Project Country: India Project Code: P154990 2. Bank’s approval Date of the procurement Plan: Draft Procurement Plan dated April 24, 2015 Revision 0: Agreed by the Bank on April 25, 2015 Revision 1: March 30, 217 Revision 2: Feb 15 2019 3. Date of General Procurement Notice: September 01 2015 4. Period covered by this procurement plan: next 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Methods and Threshold Category Method of Threshold (US$ Equivalent) Procurement Goods and Non- ICB >3,000,000 consultant LIB Wherever agreed by the services Bank NCB Up to 3,000,000 (with NCB conditions) Shopping Up to 500,000 DC As per Para 3.7 of the Bank Guidelines, wherever agreed and with prior agreement with the Bank Force Account As per Para 3.9 of Guidelines Framework As per Para 3.6 of Agreements Guidelines Works and Supply ICB >40,000,000 and Installation NCB Up to 40,000,000 (with NCB conditions) Shopping Up to 1,000,000 carried out through a qualified local contractor selected through shopping (after inviting a minimum of three quotations in response to a written invitation with a minimum of 15 days’ notice period) Force Account As per Para 3.9 of Guidelines DC As per Para 3.7 of Guidelines,  Prior Review by the Bank. The Bank will prior review the following contracts: • Works: All contracts more than US$ 10.0 million equivalent; • Goods: All contracts more than US$ 2.0 million equivalent; • Information Technology: All contracts more than US$ 2.0 million equivalent; and • Non-Consulting Services: All contracts more than US$ 2.0 million equivalent  The PMU shall prior review the first contract issued by each implementing agency, if the estimate of those contracts are below the prior review threshold value. The Bank will conduct prior review for only those contract whose estimate falls in prior review threshold value. In addition, the justifications for all contracts to be issued on LIB, single-source (>US$ 30,000) or direct contracting (>US$ 30,000) basis will be subject to Banks prior review. These thresholds are for the initial 18 months period and are based on the procurement performance of the project, these thresholds will be modified. In addition, the Bank will carry out an annual ex post procurement review of the procurement falling below the prior review threshold mentioned above.  All contracts below the specified prior review threshold value shall be subject to Post Procurement Review (PPR). The IA shall prepare a list of contract and submit it to the Bank for conducting PPR. The PPR will be conducted on annual basis. 2. Pre-qualification. Not applicable 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued by Project Management Unit JTFRP, J&K, India All the contracts issued under the project will follow the World Bank’s Guidelines: Bank’s “Guidelines: Procurement under IBRD Loans and IDA Credits” dated January 2011and revised in July 2014and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated January 2011 and revised in July 2014, In case of any inconsistency between the Procurement Manual or Government Procurement Procedures and the Bank Guidelines, the latter shall prevail. 4. Any Other Special Procurement Arrangements: The bid evaluation will be carried out as per agreed timeline in the Procurement Manual.  National Competitive Bidding (NCB): Any contract exceeding shopping threshold shall be procured using NCB method. The model bidding documents for NCB as agreed with the GoI Task Force (and as amended from time to time), shall be used for bidding. The following NCB provisions shall apply: i. Only the model bidding documents for NCB as agreed with the GoI Task Force (and as amended from time to time), shall be used for bidding. ii. Invitation to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids. For smaller packages (lesser than US$1 million for Works and US$ 500,000 for Goods), advertisement in state newspapers will be accepted with at least 15 days given for submission of bids; iii. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprise from any given State; iv. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; v. At the Borrower's request, the Bank may agree to the Borrower's use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. vi. For prior review contracts, extension of bid validity shall not be allowed with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by Bank only in cases of Force Majeure and circumstance beyond the control of the Purchaser/Employer); vii. For prior review contracts , re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank; viii. The system of rejecting bids outside a pre-determined margin or “bracket” of prices shall not be used in the project; ix. Government e-Marketplace (GeM)1 set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations (RFQ) method. x. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. xi. Two or three envelop system will not be used (expect when suing e-procurement system assessed and agreed by the Bank. xii. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety ("ESHS") risks and impacts.  Force Account: When contractors/suppliers are unlikely to bid at reasonable prices because of the location and risk associated with the project or a certain government agency has exclusive rights in certain type of works/supply, borrowers may use their own government departments’ personnel and equipment or government owned construction unit may be the only practical method, provided that the borrower has sufficient managerial capacity and possesses the required technical and financial controls to report to the Bank on expenditure as per paragraph 3.9 of the Procurement Guidelines.  Framework Agreements: State level rate contracts will be examined by the Bank and if agreed, may also be used as framework agreements. Implementing agencies also have option to set-up new framework agreements as per paragraph 3.6 of Guidelines.  Use of government Institutions and Enterprise: Government owned enterprise or institutions in India may be hired for its unique and exceptional nature if their participation is considered critical to the project implementation. In such cases, the conditions given in clauses 1.13 of Consultant Guidelines shall be satisfied and each case will be subject to prior review by the Bank. The works contracts up to cumulative amount of 37.5 million USD, would be directly executed by the J&K Projects Construction 1 Use of GeM will be allowed in lieu of RFQ as per following details: • up to INR 50,000 in catalogue mode (viz. any available item could be selected by IA without further competition), provided selected Item/Supplier meeting the requisite quality, specification and delivery period. • up to INR 3 Million from the Supplier having lowest price amongst at least three Suppliers meeting the requisite quality, specification and delivery period. The tools for online bidding and online reverse auction available on GeM may be used by the Purchaser. • up to INR equivalent of US$ 500,000 from the Supplier having lowest price and meeting the requisite quality, specification and delivery period after mandatorily obtaining bids from at least three Suppliers, using online bidding or reverse auction tool provided on GeM. Corporation Ltd., which a Public Sector Undertaking. J&K Projects Construction Corporation Ltd. is executing projects of State as well as Central Government departments. 5. Summary of the Procurement Packages planned during the first 18 months and thereafter: Available on STEP III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Category Method of Procurement Threshold (US$ Equivalent) Consultants’ CQS Up to 500,000 Services SSS Up to 200,000 As per para 3.9-3.11 of Guidelines Individuals As per Section V of Guidelines QCBS/QBS/FBS/LCS for all other cases (i) International >800,000 shortlist (ii) Shortlist may Up to 800,000 comprise national consultants only  Prior Review by the Bank. The Bank will prior review the following contracts: o Consulting Services: All contracts more than US$ 1.0 million equivalent for firm; and o Consulting Services: All contracts more than US$ 300,000 equivalent for Individuals. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule: Available on STEP Use of e-procurement portal Procurement of goods works and non-consultancy services shall be conducted using the e-procurement portal www.jktenders.gov.in. All IAs shall use this e-procurement portal for procurement of goods works and non-consulting services. PROCUREMENT India : Jhelum and Tawi Flood Recovery Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2016-12-22 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154990 GPN Date: 2016-11-18 Project Name: Jhelum and Tawi Flood Recovery Project Loan / Credit No: IDA / 56950 I Executing Agency(ies): ndustry & Commerce Department (I&CD), J&K WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned JTFRP/JK/IC/JKI/B/W001/16 / Construction/Repairs of factory Building at Bemina Woolen Mills Sgr. under Restoration and Single Stage - Two 2018-11- Project JTRF for restoration IDA / 56950 Post Request for Bids Open - National 732,230.00 218,451.40 Signed 2017-01-30 2017-08-18 2017-02-06 2017-03-08 2017-10-25 2017-04-14 2018-02-16 2017-05-19 2018-03-01 strengthening of livelihoods Envelope 18 and strengthening of livelihood for Composite Market Centre for Whole Chain of Wool Activity . JTFRP/JK/IC/JKI/R/W002/16 / Construction of factory building under JTFR Project for Restoration and Restoration and Single Stage - Two 1,735,510.0 2018-12- Strengthening of Livelihood IDA / 56950 Post Request for Bids Open - National 2,937,100.00 Signed 2017-01-30 2017-08-01 2017-02-06 2017-08-11 2017-03-08 2017-12-13 2017-04-14 2018-02-16 2017-05-22 2018-03-01 strengthening of livelihoods Envelope 0 21 for Composite Market Centre for Whole chain of Silk Activity at Silk Factory Rajbagh Srinagar. JTFRRP/JK/IC/CDI/CSPEP/W00 1/16 / Construction of PG Restoration and Single Stage - Two 2018-12- building at Craft Development IDA / 56950 Post Request for Bids Open - National 400,000.00 0.00 Canceled 2017-01-30 2017-02-04 2017-03-06 2017-04-20 2017-06-01 strengthening of livelihoods Envelope 01 Institute Srinagar under JTFRP . JTFRP/JK/IC/BWM/W003/19 / Interior works for showroom Restoration and Single Stage - Two 2019-12- cum interpretation centre for IDA / 56950 Post Request for Bids Open - National 338,500.00 312,919.37 Signed 2019-01-25 2019-04-13 2019-01-30 2019-04-29 2019-03-13 2019-06-21 2019-05-26 2019-10-07 2019-06-30 2019-11-29 strengthening of livelihoods Envelope 27 Government Woollen Mills Bemina Srinagar J&K GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JTFRP/JK/IC/CDI/CSPEP/G001 /16 / Procurement of Digital and IT Equipment's , net working soft ware for upcoming post Graduate Restoration and Single Stage - One program in craft Design and IDA / 56950 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2018-03-13 2018-03-18 2018-04-17 2018-06-01 2018-07-06 2018-10-04 strengthening of livelihoods Envelope sustainable development in creative industries being launched by CDI.Sgr under JTFRP for restoration strengthening of livelihoods. JTFRP/JK/IC/CDI/CSPEP/G003 /16 / Procurement for Printing of Brochures and other publicity materials for upcoming post graduate Restoration and Single Stage - One IDA / 56950 Post Request for Bids Open - National 8,000.00 0.00 Canceled 2018-01-09 2018-01-14 2018-02-13 2018-03-06 2018-04-13 2018-06-12 Programs in craft design and strengthening of livelihoods Envelope sustainable development in creative industries to be launched by CDI Sgr. under JTFRP . JTFRP/JK/IC/JKI/R/G001/16 / Procurement of machines under Jhelum and Tawi flood recovery project for restoration and Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 651,098.00 0.00 Canceled 2018-02-25 2018-03-07 2018-04-10 2018-05-18 2018-06-05 2018-12-05 strengthening of livelihood strengthening of livelihoods Envelope composite market centre for whole chain of silk activity in Govt. Silk Factory Rajbagh Srinagar. JTFRP/JK/IC/JKI/B/G002/16 / Procurement of machines under Jehlum and Tawi Flood recovery project for restoration and strengthening Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 1,074,124.00 0.00 Canceled 2018-02-26 2018-03-10 2018-04-14 2018-05-20 2018-06-10 2018-12-15 of livelihoods composite strengthening of livelihoods Envelope market centre for whole chain of wool activity in Govt. Wool Mills at Bemina Srinagar. JTFRP/JK/IC/BWM/G001/18 / Supply installation testing and Restoration and Single Stage - Two commissioning of various IDA / 56950 Post Request for Bids Open - National 338,460.00 0.00 Canceled 2018-09-28 2018-10-05 2018-10-03 2018-10-16 2018-11-14 2018-11-24 2019-01-27 2019-03-03 2019-08-30 strengthening of livelihoods Envelope textile machinery for Govt. Woolen mills Bemina JTFRP/JK/IC/BWM/G002/18 / Supply installation testing and Restoration and Single Stage - Two commissioning of cone IDA / 56950 Post Request for Bids Open - National 55,385.00 0.00 Canceled 2018-09-28 2018-10-06 2018-10-03 2018-10-16 2018-11-14 2018-11-24 2019-01-27 2019-03-03 2019-08-30 strengthening of livelihoods Envelope winders for Govt Woollen Mills Bemina Page 1 JTFRP/JK/IC/BWM/G003/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of Pirn IDA / 56950 Post Request for Bids Open - National 16,155.00 0.00 Canceled 2018-09-28 2018-10-09 2018-10-03 2018-10-16 2018-11-14 2018-11-26 2019-01-27 2019-03-03 2019-08-30 strengthening of livelihoods Envelope winder for Govt Woollen Mills Bemina JTFRP/JK/IC/BWM/G004/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of Rapier IDA / 56950 Post Request for Bids Open - National 246,150.00 0.00 Canceled 2018-10-02 2018-10-09 2018-10-07 2018-10-16 2018-11-18 2018-11-26 2019-01-31 2019-03-07 2019-09-03 strengthening of livelihoods Envelope Looms for Government Woollen Mills Bemina JTFRP/JK/IC/BWM/G005/18 / Supply Installation Testing and Commissioning of roller Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 30,770.00 0.00 Canceled 2018-10-03 2018-10-09 2018-10-08 2018-10-16 2018-11-19 2018-11-27 2019-02-01 2019-03-08 2019-09-04 calendaring machine for strengthening of livelihoods Envelope Government Woollen Mills Bemina. JTFRP/JK/IC/BWM/G006/18 / Supply Installation Testing and Commissioning of dyeing Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 170,000.00 0.00 Canceled 2018-10-08 2018-10-09 2018-10-13 2018-10-16 2018-11-24 2018-11-27 2019-02-06 2019-03-13 2019-09-09 and related machinery for strengthening of livelihoods Envelope Government Woollen Mills Bemina JTFRP/JK/IC/BWM/G007/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of Boilers IDA / 56950 Post Request for Bids Open - National 138,460.00 0.00 Canceled 2018-10-08 2018-10-09 2018-10-13 2018-10-16 2018-11-24 2018-11-28 2019-02-06 2019-03-13 2019-09-09 strengthening of livelihoods Envelope for Government Woollen Mills Bemina JTFRP/JK/IC/BWM/G008/18 / Supply Installation Testing and Commissioning of Fabric Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 23,000.00 0.00 Canceled 2018-10-08 2018-10-09 2018-10-13 2018-10-16 2018-11-24 2018-11-29 2019-02-06 2019-03-13 2019-09-09 Inspection machines at strengthening of livelihoods Envelope Government Woollen Mills Bemina JTFRP/JK/IC/BMW/G009/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of Twist IDA / 56950 Post Request for Bids Open - National 15,385.00 0.00 Canceled 2018-10-05 2018-10-09 2018-10-10 2018-10-16 2018-11-21 2018-11-29 2019-02-03 2019-03-10 2019-09-06 strengthening of livelihoods Envelope Setting Chamber Government Woollen Mills Bemina JTFRP/JK/IC/RSF/G001/18 / Supply Installation Testing Restoration and Single Stage - Two and Commissioning of rapier IDA / 56950 Post Request for Bids Open - National 653,900.00 0.00 Canceled 2018-10-24 2018-10-20 2018-10-29 2018-10-29 2018-12-10 2018-12-12 2019-02-22 2019-03-29 2019-09-25 strengthening of livelihoods Envelope Looms for Govt Silk Factory Rajbagh Srinagar J&K JTFRP/JK/IC/BWM/G014/19 / Supply Installation, Testing and Commissioning of Rapier Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 133,000.00 347,936.00 Signed 2019-01-21 2019-01-18 2019-01-26 2019-01-23 2019-03-09 2019-03-12 2019-05-22 2019-11-11 2019-06-26 2020-02-10 2019-09-24 looms for Government strengthening of livelihoods Envelope Woollen Mills Bemina Srinagar J&K JTFRP/JK/IC/RSF/G011/19 / Supply Installation Testing & Under Restoration and Single Stage - Two commissioning of Rapier IDA / 56950 Post Request for Bids Open - National 625,000.00 0.00 Implementati 2019-01-21 2019-01-17 2019-01-26 2019-01-22 2019-03-09 2019-05-22 2019-06-26 2019-09-24 strengthening of livelihoods Envelope Looms for Government Silk on Factory Rajbagh, Srinagar J&K JTFRP/JK/IC/RSF/G002/19 / Supply Installation Testing and Commissioning of Two Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 1,086,000.00 0.00 Canceled 2019-05-27 2019-05-27 2019-06-01 2019-06-11 2019-07-13 2019-09-25 2019-10-30 2020-04-27 for One Twisters for strengthening of livelihoods Envelope Government Silk Factory Rajbagh Srinagar, J&K JTFRP/JK/IC/RSF/G003/19 / Supply Installation Testing and Commissioning of Restoration and Single Stage - Two preparatory machinery for IDA / 56950 Post Request for Bids Open - National 121,500.00 0.00 Canceled 2019-06-14 2019-06-24 2019-06-19 2019-07-09 2019-07-31 2019-10-13 2019-11-17 2020-05-15 strengthening of livelihoods Envelope government silk factory rajbagh Srinagar Jammu and Kashmir JTFRP/JK/IC/RSF/G022/19 / Supply Installation Testing and Commissioning of Two Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 634,500.00 622,940.85 Signed 2019-07-21 2019-09-09 2019-07-26 2020-02-29 2019-09-06 2019-11-09 2019-11-19 2019-12-24 2019-12-24 2020-02-14 2020-06-21 for One Twisters for strengthening of livelihoods Envelope Government Silk Factory Rajbagh Srinagar J&K JTFRP/JK/IC/BWM/G017/19 / Supply Installation Testing & Restoration and Single Stage - Two Commissioning of boilers for IDA / 56950 Post Request for Bids Open - National 133,000.00 0.00 Canceled 2019-01-21 2019-01-18 2019-01-26 2019-03-09 2019-05-22 2019-06-26 2019-09-24 strengthening of livelihoods Envelope Government Woollen Mills Bemina Srinagar J&k JTFRP/JK/IC/BWM/G011/19 / Supply Installation & Testing Restoration and Single Stage - Two of various textile machinery IDA / 56950 Post Request for Bids Open - National 338,460.00 0.00 Canceled 2019-01-21 2019-01-18 2019-01-26 2019-01-23 2019-03-09 2019-05-22 2019-06-26 2019-09-24 strengthening of livelihoods Envelope for Government Woollen Mills, Bemina, Srinagar J&K JTFRP/JK/IC/BWM/G016/19 / Supply Installation Testing & Commissioning of dyeing & Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 162,500.00 0.00 Canceled 2019-01-21 2019-01-18 2019-01-26 2019-01-23 2019-03-09 2019-05-22 2019-06-26 2019-09-24 related machinery for strengthening of livelihoods Envelope Government Woollen Mills Bemina Srinagar J&K JTFRP/JK/IC/BWM/G017/19- 2 / Supply Installation Testing and Commisioning of Boilers Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 193,000.00 0.00 Canceled 2020-03-10 2020-04-05 2020-03-15 2020-05-12 2020-04-26 2020-07-09 2020-08-13 2020-11-11 for Government Woolen Mills strengthening of livelihoods Envelope Bemina and Government Silk Factory Rajbagh Srinagar J&K Page 2 JTFRP/JK/IC/BWM/G016/19- 2 / Supply Installation Testing Under and Commissioning of dyeing Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 162,500.00 0.00 Implementati 2020-03-10 2020-05-11 2020-03-15 2020-05-20 2020-04-26 2020-07-09 2020-08-13 2020-11-11 & related machinery for strengthening of livelihoods Envelope on Government Woollen Mills Bemina Srinagar J&K JTFRP/JK/IC/BWM/G011/19- 2 / Supply Installation Testing Under and Commissioning for Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 338,460.00 0.00 Implementati 2020-03-10 2020-08-10 2020-03-15 2020-09-12 2020-04-26 2020-07-09 2020-08-13 2020-11-11 various textile machinery for strengthening of livelihoods Envelope on Government Woollen Mills Bemina Srinagar J&K JTFRP/JK/IC/RSF/G003/19-2 / Supply, Installation, Testing and Commissioning of Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 104,300.00 61,849.02 Signed 2020-05-19 2020-05-22 2020-05-24 2020-05-26 2020-07-05 2020-06-26 2020-09-17 2020-07-25 2020-10-22 2020-08-10 2021-04-20 Preparatory Machinery for strengthening of livelihoods Envelope Government Silk Factory, Rajbagh, Srinagar, J&K. JTFRP/JK/IC/RSF/G021/20 / Supply Installation Testing Under Restoration and Single Stage - Two and Commissioning of rapier IDA / 56950 Post Request for Bids Open - National 385,700.00 0.00 Implementati 2020-07-21 2020-08-02 2020-07-26 2020-08-10 2020-09-06 2020-11-19 2020-12-24 2021-06-22 strengthening of livelihoods Envelope Looms for Govt Silk Factory on Rajbagh Srinagar J&K JTFRP/JK/IC/RSF/G043/20 / Supply Installation Testing Under and Commissioning of Restoration and Single Stage - Two IDA / 56950 Post Request for Bids Open - National 185,700.00 0.00 Implementati 2020-07-22 2020-08-02 2020-07-27 2020-08-10 2020-09-07 2020-11-20 2020-12-25 2021-06-23 Weaving and Finishing strengthening of livelihoods Envelope on Machinery for Government Silk Factory Rajbagh Srinagar J&K JTFRP/JK/IC/BWM/G001/20 / Supply of bought out items Under Restoration and for Interiors of new showroom IDA / 56950 Post Direct Selection Direct 35,700.00 0.00 Implementati 2020-10-16 2020-10-05 2020-10-21 2020-11-25 2021-05-24 strengthening of livelihoods cum interpretation centre at on Govt Woollen Mills Bemina JTFRP/JK/IC/BWM/G017/19- 2-2 / Supply Installation Testing and Commisioning of Restoration and IDA / 56950 Post Request for Bids 193,000.00 0.00 Canceled 2020-10-07 2020-12-24 2020-10-12 2021-01-05 2020-11-23 2021-02-05 2021-02-05 2021-03-12 2021-06-10 Boilers for Government strengthening of livelihoods Woollens Mills Bemina and Government Silk Factory Rajbagh JTFRP/JK/IC/BWM/G001/21 / Supply, Installation, Testing & Commissioning of Boilers for Under Restoration and Single Stage - Two Government Silk Factory, IDA / 56950 Post Request for Bids Open - National 235,700.00 0.00 Implementati 2021-05-12 2021-05-19 2021-05-17 2021-05-25 2021-06-06 2021-07-30 2021-09-03 2021-12-02 strengthening of livelihoods Envelope Rajbagh and Government on Woollen Mills, Bemina, Srinagar, J&K NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JTFRP/JK/IC/CDI/CSPEP/C003 /16 / Providing of consultancy services towards design of publicity and promotion material for Restoration and Least Cost IDA / 56950 Post Open - National 3,071.00 0.00 Canceled 2017-06-28 2017-07-12 2017-08-11 2017-09-10 2017-09-25 2017-10-17 2017-11-21 2017-12-21 launching of Post Graduate strengthening of livelihoods Selection Program in Craft Design and sustainable development in creative industriesby CDI Sgr under JTFRP . JTRF/JK/IC/HD/C002/16 / Consultancy for census of Restoration and Quality And Cost- Craft practitioners in J&K and IDA / 56950 Post Open - National 307,700.00 368,747.71 Signed 2017-01-25 2017-01-22 2017-02-08 2017-04-05 2017-03-10 2017-08-20 2017-04-16 2018-08-20 2017-05-01 2018-10-20 2017-05-23 2019-03-14 2017-06-27 2019-05-30 2018-06-27 strengthening of livelihoods Based Selection to develop a complete Artisans database. JTFRP/JK/IC/HD/C001/16 / Consultancy for feasibility of Reconstruction of roads and Quality And Cost- IDA / 56950 Post Open - National 15,400.00 0.00 Canceled 2017-01-28 2017-01-19 2017-02-12 2017-04-05 2017-03-19 2017-04-18 2017-05-03 2017-05-25 2017-06-29 2017-08-28 site & working Model for bridges Based Selection Kashmir Haat. JTFRP/JK/IC/HD/C003/17 / Develop E Commerce Strategy and Actionable Business Plan, Restoration and Quality And Cost- Design Build And Maintain E IDA / 56950 Post Open - National 230,800.00 0.00 Canceled 2017-03-15 2017-03-13 2017-04-05 2017-04-05 2017-05-19 2017-06-16 2017-07-01 2017-08-05 2017-09-09 2021-03-12 strengthening of livelihoods Based Selection Commerce Portal and Manage E Commerce Operations under JTFRP. JTFRP/JK/IC/HD/C006/17 / Develop E Commerce Strategy and Actionable Business Plan, Restoration and Quality And Cost- Design Build And Maintain E IDA / 56950 Post Open - National 230,800.00 0.00 Canceled 2017-08-10 2017-09-26 2017-08-31 2017-10-20 2017-10-14 2017-11-11 2017-12-11 2018-01-15 2018-02-19 2020-06-01 strengthening of livelihoods Based Selection Commerce Portal and Manage E Commerce Operations under JTFRP JTFRP/JK/IC/HD/R/C001/18 / Consultancy for feasibility of site and working model for Restoration and Quality And Cost- IDA / 56950 Post Open - National 80,000.00 0.00 Canceled 2018-03-25 2018-04-19 2018-04-15 2018-05-29 2018-06-26 2018-07-26 2018-08-30 2018-10-04 2019-01-02 Kashmir Haat and strengthening of livelihoods Based Selection International Trade Centre at Pampore Page 3 JTFRP/JK/IC/HD/ECOM/C002/ 18 / Develop e-Commerce Strategy and Actionable Restoration and Quality And Cost- Business PlanDesign, Build, IDA / 56950 Post Open - National 230,800.00 0.00 Canceled 2018-04-27 2018-08-06 2018-05-07 2018-06-13 2018-07-11 2018-07-26 2018-08-30 2018-10-04 2022-04-06 strengthening of livelihoods Based Selection Maintain and Manage e- Commerce Operations under JTFRP JTFRP/JK/IC/JKI/UCCN/C002/ 18 / Consultancy Services For preparation of dossier for Restoration and Quality And Cost- IDA / 56950 Post Open - National 115,400.00 64,016.52 Signed 2018-08-05 2018-08-06 2018-08-26 2018-10-09 2018-10-01 2018-11-06 2018-12-11 2018-12-06 2019-03-20 2019-01-10 2019-04-10 2019-02-14 2019-04-23 2020-02-14 inclusion of Srinagar city On strengthening of livelihoods Based Selection UNESCO Creative Cities Network JTFRP/JK/IC/HD/WW/C005/18 / Consultancy services to carry out end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-09-28 2018-10-15 2018-10-03 2018-11-10 2018-11-16 2018-12-14 2019-01-13 2019-02-17 2019-03-24 2020-03-23 development activities in strengthening of livelihoods Based Selection willow wicker cluster at Ganderbal JTFRP/JK/IC/HDD/WB/C007/1 8 / Consultancy services to undertake Cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-10-18 2018-10-20 2018-11-08 2018-11-10 2018-12-22 2019-01-19 2019-02-18 2019-03-25 2019-04-29 2022-04-04 Development activities in strengthening of livelihoods Based Selection Wool Cluster of Bandipora, Jammu and Kashmir JTFRP/JK/IC/HDD/WP/C008/1 8 / Consultancy services to undertake Cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-10-19 2018-10-25 2018-11-09 2018-11-10 2018-12-23 2019-01-20 2019-02-19 2019-03-26 2019-04-30 2022-04-04 Development activities in strengthening of livelihoods Based Selection Wool Cluster of Pulwama, Jammu and Kashmir JTFRP/JK/IC/BBC/C010/18 / Consultancy services to develop and launch branding Restoration and Quality And Cost- IDA / 56950 Post Open - National 153,850.00 0.00 Canceled 2018-10-29 2018-12-03 2018-11-19 2018-12-17 2019-01-02 2019-01-30 2019-03-01 2019-04-05 2019-05-10 2020-05-09 and communications strengthening of livelihoods Based Selection campaign for products of J&K state JTFRP/JK/IC/IML/C011/18 / Consultancy to undertake training of artisans in product development cycle for Restoration and Quality And Cost- IDA / 56950 Post Open - National 307,700.00 0.00 Canceled 2018-10-29 2018-12-03 2018-11-19 2018-12-17 2019-01-02 2019-01-30 2019-03-01 2019-04-05 2019-05-10 2021-05-09 International Market Linkages strengthening of livelihoods Based Selection in Willow Wicker, Papier Machie, Embroidery and Wool in Jammu and Kashmir JTFRP/JK/IC/HD/WW/C015/18 / Consultancy services to undertake end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-11-30 2018-12-03 2018-12-21 2018-12-17 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-11 2021-06-10 development actvities in strengthening of livelihoods Based Selection Willow Wicker Cluster in Ganderbal JTFRP/JK/IC/HDD/WP/C018/1 8 / Consultancy services for carrying out end to end Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-11-30 2018-12-03 2018-12-21 2018-12-17 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-11 2021-06-10 cluster development strengthening of livelihoods Based Selection activitiesin wool cluster at Pulwama JTFRP/JK/IC/HDD/WB/C017/1 8 / Consultancy services for Restoration and Quality And Cost- carrying out end to end IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2018-11-30 2018-12-03 2018-12-21 2018-12-17 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-11 2021-06-10 strengthening of livelihoods Based Selection cluster development activities in wool cluster at Bandipora. JTFRP/JK/IC/HD/ECOM/C012/ 19 / Consultancy services to develop e-Commerce Strategy Consultant Restoration and and Actionable Business Plan IDA / 56950 Post Qualification Open - National 230,800.00 0.00 Canceled 2019-01-20 2019-02-10 2019-03-26 2019-04-25 2019-05-30 2022-11-30 strengthening of livelihoods Design, Build, Maintain and Selection Manage e-Commerce Operations JTFRP/JK/IC/IML/C021/19 / to undertake Training of Artisans in Product Development Cycle for Restoration and Quality And Cost- Under IDA / 56950 Post Open - National 307,700.00 0.00 2019-02-18 2019-02-15 2019-03-11 2019-02-28 2019-04-24 2019-05-22 2019-06-21 2019-07-26 2019-08-30 2021-08-29 International Market Linkages strengthening of livelihoods Based Selection Implementation in Willow Wicker, Paper Mache, Crewel stitch embroidery and Wool in Jammu and Kashmir JTFRP/JK/IC/HDD/WB/C027/1 9 / Consultancy services to undertake Cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 256,006.78 Signed 2019-02-18 2019-03-12 2019-03-11 2019-03-21 2019-04-24 2019-06-25 2019-05-22 2019-08-29 2019-06-21 2019-12-10 2019-07-26 2019-12-16 2019-08-30 2020-02-10 2021-08-29 Development activities in strengthening of livelihoods Based Selection Wool Cluster of Bandipora, Jammu and Kashmir JTFRP/JK/IC/HDD/WP/C020/1 9 / Consultancy services to undertake Cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-02-18 2019-03-18 2019-03-11 2019-03-21 2019-04-24 2019-05-22 2019-06-21 2019-07-26 2019-08-30 2021-08-29 Development activities in strengthening of livelihoods Based Selection Wool Cluster of Pulwama, Jammu and Kashmir JTFRP/JK/IC/BBC/C020/19 / Consultancy services to Restoration and Quality And Cost- develop and launch branding IDA / 56950 Post Open - National 153,850.00 296,862.77 Signed 2019-02-18 2019-02-20 2019-03-11 2019-02-28 2019-04-24 2019-12-07 2019-05-22 2020-02-27 2019-06-21 2020-03-16 2019-07-26 2020-06-01 2019-08-30 2020-07-26 2020-08-29 strengthening of livelihoods Based Selection and communications Campaign for J&K products JTFRP/JK/HD/WW/C025/19 / Consultancy services to carry out end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-03-25 2019-03-15 2019-04-15 2019-03-21 2019-05-29 2019-06-26 2019-07-26 2019-08-30 2019-10-04 2021-10-03 development activities in strengthening of livelihoods Based Selection Willow Wicker craft at Ganderbal J&K Page 4 JTFRP/JK/IC/JKI/R/C005/19 / Consultancy services for Restoration and Quality And Cost- conservation/restoration and IDA / 56950 Post Open - National 114,300.00 116,526.88 Signed 2019-04-10 2019-04-10 2019-05-01 2019-04-14 2019-06-14 2019-12-04 2019-07-12 2020-02-12 2019-08-11 2020-02-18 2019-09-15 2020-04-24 2019-10-20 2020-06-30 2021-04-12 strengthening of livelihoods Based Selection adaptive reuse of Govt Silk Factory Rajbagh, Srinagar J&K JTFRP/JK/IC/HD/ECOM/022/1 9 / Consultancy services to develop e-Commerce Strategy Restoration and Quality And Cost- and Actionable Business Plan IDA / 56950 Post Open - National 657,100.00 0.00 Canceled 2019-04-12 2019-05-24 2019-05-03 2019-06-05 2019-06-16 2019-07-14 2019-08-13 2019-09-17 2019-10-22 2023-04-24 strengthening of livelihoods Based Selection Design, Build, Maintain and Manage e-Commerce Operations JTFRP/JK/HD/WW/C035/19 / Consultancy services to carry out end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-07-21 2019-09-01 2019-08-11 2019-09-29 2019-09-24 2019-10-22 2019-11-21 2019-12-26 2020-01-30 2022-01-29 development activities in strengthening of livelihoods Based Selection Willow Wicker craft at Ganderbal J&K JTFRP/JK/IC/HDD/WP/C030/1 9 / Consultancy services to Restoration and Quality And Cost- undertake cluster IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-07-21 2019-09-08 2019-08-11 2019-09-29 2019-09-24 2019-10-22 2019-11-21 2019-12-26 2020-01-30 2022-01-29 strengthening of livelihoods Based Selection development activities in Wool cluster of Pulwama J&K JTFRP/JK/HD/WW/C035/19-2 / Consultancy services to carry out end to end cluster Restoration and Quality And Cost- IDA / 56950 Post Open - National 384,615.00 154,542.70 Signed 2019-11-06 2019-10-20 2019-11-27 2019-11-19 2020-01-10 2020-05-23 2020-02-07 2020-05-29 2020-03-08 2020-06-06 2020-04-12 2020-06-18 2020-05-17 2020-08-14 2022-05-17 development activities in strengthening of livelihoods Based Selection willow wicker cluster at ganderbal JTFRP/JK/IC/HDD/WP/C030/1 9-2 / Consultancy services to Restoration and Quality And Cost- undertake end to end cluster IDA / 56950 Post Open - National 384,615.00 0.00 Canceled 2019-11-06 2019-11-04 2019-11-27 2019-11-19 2020-01-10 2020-02-07 2020-03-08 2020-04-12 2020-05-17 2022-05-17 strengthening of livelihoods Based Selection development activities in wool cluster at Pulwama INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JTFRP/JK/IC/JKI/R/C001/16 / Consultancy to provide technical assistance for Restoration and assessing tangible and IDA / 56950 Post Direct Selection Direct 15,400.00 41,127.33 Completed 2017-01-18 2017-01-19 2017-02-01 2017-02-18 2017-03-29 2017-04-07 2017-05-13 2017-06-10 strengthening of livelihoods intangible heritage value of Building at Silk Factory Rajbagh Srinagar. JTFRP/JK/IC/CDI/CSPEP/C002 /16 / Individual Consultant for curriculum, course material development and It equipment for CDIs PG Individual Restoration and programs in Craft Design and IDA / 56950 Post Consultant Limited 23,000.00 0.00 Canceled 2017-01-05 2017-01-05 2017-01-10 2017-01-15 2017-01-31 2017-03-07 2017-09-03 strengthening of livelihoods sustainable development in Selection creative industries Under JTFRP for restoration and Strengthening of Livelihoods at CDI Sgr. JTFRP/JK/IC/RB/C002/17 / Consultancy for Technical Individual assistance in sourcing Restoration and IDA / 56950 Post Consultant Limited 15,400.00 4,706.07 Signed 2017-03-06 2017-04-06 2017-03-13 2017-05-05 2017-04-03 2017-06-06 2017-05-08 2017-06-20 2017-06-12 machines and Equipments for strengthening of livelihoods Selection Silk Factory Rajbagh and Bemina Woolen Mills Srinagar. JTFRP/JK/IC/JKI/BD/C003 / Consultancy for providing Restoration and retail Design of show rooms IDA / 56950 Post Direct Selection Direct 23,000.00 69,319.56 Signed 2017-04-06 2017-03-01 2017-04-16 2017-04-14 2017-06-20 2017-06-20 2018-12-20 strengthening of livelihoods at Bemina Woolen Mills and Dehli Show room under JTFRP . JTFRP/JK/IC/JKI/R/B/C002/17 / Consultancy for Technical Assistance in sourcing Individual Restoration and machines and equipments for IDA / 56950 Post Consultant Open 15,400.00 0.00 Canceled 2017-02-20 2017-04-01 2017-04-12 2017-05-03 2017-06-07 strengthening of livelihoods Silk factory RajBagh and Selection Bemina Woolen Mills Srinagar. JTFRP/JK/IC/HD/C004/17 / Consultancy services of Domain Expert towards the Restoration and IDA / 56950 Post Direct Selection Direct 461,500.00 340,042.11 Signed 2018-02-05 2018-02-05 2018-02-15 2018-02-08 2018-04-21 2018-07-25 2020-11-09 development of Crewel strengthening of livelihoods Chainstitch Cluster at Noor Bagh. JTFRP/JK/IC/HD/CD-PM- C004-18 / Consultancy Restoration and services for development of IDA / 56950 Post Direct Selection Direct 461,500.00 309,975.39 Signed 2018-04-18 2018-04-18 2018-04-28 2018-04-23 2018-05-21 2018-07-25 2020-05-31 strengthening of livelihoods Papier Machie Cluster at Zadibal Srinagar JTFRP/JK/IC/JKI/CRB001/18 / Consultancy for Technical Assistance and Project Supervision for Various Restoration and IDA / 56950 Post Direct Selection Direct 33,900.00 24,213.75 Signed 2018-07-31 2017-12-11 2018-08-06 2018-04-10 2018-10-10 2018-07-31 2019-04-08 Building Works Identified strengthening of livelihoods Under The Livelihood Component of Jehlum Tawi Floor Recovery Project JTFRP/JK/IC/HD/ITC/C006/18 / Consultancy services for feasibility study of site and Restoration and IDA / 56950 Post Direct Selection Direct 77,000.00 0.00 Canceled 2018-10-17 2018-10-27 2018-12-31 2019-06-29 working model for Kashmir strengthening of livelihoods Haat and International Trade Centre Pampore JK Page 5 JTFRP/JK/IC/SOL/C001/19 / Consultancy services for Restoration and Under adaptive reuse of Solina IDA / 56950 Prior Direct Selection Direct 357,000.00 0.00 2019-12-16 2020-10-10 2019-12-26 2020-01-10 2020-02-29 2020-08-27 strengthening of livelihoods Implementation Filatures as Arts, Culture and Crafts Centre JTFRP/JK/IC/DS/S/C001/20 / Consultancy services for undertaking a comprehensive study to determine the requirements and Restoration and Under specifications of machinery, IDA / 56950 Post Direct Selection Direct 15,750.00 0.00 2020-07-21 2020-08-18 2020-07-31 2020-10-04 2021-04-02 strengthening of livelihoods Implementation allied equipment and facilities for the existing Common Facility Centre(CFC) and formulate Quality Control and Testing benchmarks for JTFRP/JK/IC/DS/S/C002/20 / Consultancy services for Survey, Collection and Multiplication of superior Cricket Bat Willow (Salix Alba Restoration and Under IDA / 56950 Post Direct Selection Direct 128,500.00 0.00 2020-07-21 2020-08-18 2020-07-31 2020-10-04 2021-04-02 var. Caerulea) germplasm for strengthening of livelihoods Implementation livelihood security of farmers and economic sustainability of Cricket Bat Industry of Kashmir Page 6 PROCUREMENT PLAN Project information: Colombia Sustainable Low Carbon Development In Orinoquía Region Project P160680 Project Implementation agency: Ministerio de Agricultura y Desarrollo Rural -MADR- Date of the Procurement Plan: 02/06/2019 Period covered by this Procurement Plan: 02/06/2019 – 12/31/2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Sustainable Low-Carbon Development in Orinoquia region Project PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2019-02-13 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160680 GPN Date: 2019-02-13 Project Name: Sustainable Low-Carbon Development in Orinoquia region Project Loan / Credit No: TF / A6377, TF / A6376 Ministerio de Agricultura y Desarrollo Rural Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Document Amount Amount Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion Type (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-149145-GO-RFQ / Adquirir Equipos de computo, cámara, software Project Coordination, licenciado , ayudas Request for Single Stage - One TF / A6377 Management, Monitoring and Post Open - National 25,000.00 20,492.96 Completed 2020-02-23 2020-04-19 2020-02-18 2020-06-03 2020-05-25 tecnologicas audiovisulaes y Quotations Envelope Evaluation de telecomunicacion para apoyar la gestión del Proyecto Fondo biocarbono . CO-MADR-177410-GO-RFQ / Adquirir Equipos de Definition of Emission cómputo, software licenciado Reduction Program and Request for Single Stage - One TF / A6377 Post Open - National 61,200.00 0.00 Canceled 2020-06-20 2020-08-15 2020-10-14 y accesorios para apoyar la Monitoring, Reporting and Quotations Envelope gestión del Proyecto Fondo Verification biocarbono CO-MADR-205824-GO-RFB / Adquirir Equipos de cómputo, Definition of Emission software licenciado y Reduction Program and Single Stage - One TF / A6376 Post Request for Bids Open - National 231,158.77 148,408.08 Signed 2020-11-27 2020-12-29 2020-12-02 2021-02-08 2021-01-13 2021-02-18 2021-02-12 2021-04-09 2021-03-19 2021-06-18 2021-09-15 accesorios para apoyar la Monitoring, Reporting and Envelope gestión del Proyecto Fondo Verification biocarbono CO-MADR-222435-GO-RFQ / Adquisición de equipos Project Coordination, Under accesorios para la operación Request for Single Stage - One TF / A6376 Management, Monitoring and Post Open - National 36,084.00 0.00 Implementati 2021-03-20 2021-05-15 2021-11-11 del Proyecto Biocarbono Quotations Envelope Evaluation on Orinoquia y la Dirección de Innovación NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-125771-NC-RFQ / SUMINISTRO DE TIQUETES AÉREOS AL PROYECTO: DESARROLLO SOSTENIBLE Project Coordination, BAJO EN CARBONO EN LA Request for Single Stage - One TF / A6377 Management, Monitoring and Post Open - National 20,000.00 17,788.20 Signed 2019-09-05 2019-10-09 2019-10-15 2020-10-08 REGIÓN DE LA ORINOQUIA, ASÍ Quotations Envelope Evaluation COMO LA PRESTACIÓN DE SERVICIOS DE AGENCIA DE VIAJES -AÑO 1 -COMPONENTE 4 CO-MADR-132942-NC-RFQ Project Coordination, / Taller de socializacion y Request for Single Stage - One TF / A6377 Management, Monitoring and Post Open - National 4,000.00 0.00 Canceled 2019-09-05 2019-09-20 2019-09-30 arranque Fondo Biocarbono Quotations Envelope Evaluation Septiembre 2019 CO-MADR-163819-NC-RFQ / Prestar los servicios logísticos (alimentación, salón y ayudas audiovisuales) para los asistentes a la primera Project Coordination, Request for Single Stage - One Mesa Técnica TF / A6377 Management, Monitoring and Post Open 8,000.00 0.00 Canceled 2020-03-09 2020-03-21 2020-04-20 Quotations Envelope Intercomponentes para el Evaluation proyecto, “DESARROLLO SOSTENIBLE BAJO EN CARBONO EN LA REGIÓN DE LA ORINOQUIA” CO-MADR-197658-NC-RFB / Implementar la actualización catastral con enfoque Integrated Land- Use multipropósito para el Planning and Improved municipio de Arauquita, en el TF / A6377 Post Direct Selection Direct 1,500,000.00 1,180,395.29 Signed 2020-11-06 2020-11-20 2020-11-11 2020-11-20 2020-12-08 2021-01-28 2021-12-08 Governance for Deforestation departamento de Arauca, en el Control marco del Proyecto Desarrollo Sostenible Bajo en Carbono para la Orinoquia. CO-MADR-201158-NC-RFB / Inventario Forestal de la Definition of Emission región de la Orinoquía, dentro Reduction Program and Single Stage - One del Componente 3: TF / A6376 Post Request for Bids Open - National 941,000.00 0.00 Canceled 2020-11-17 2020-11-19 2020-11-22 2020-11-21 2021-01-03 2021-02-02 2021-03-09 2021-09-05 Monitoring, Reporting and Envelope Preparación del Programa de Verification Reducción de Emisiones y del MRV CO-MADR-211404-NC-RFB / Elaborar el inventario forestal de la región Orinoquia siguiendo los parámetros Definition of Emission establecidos en el Documento Under Reduction Program and Single Stage - One Marco Rector, el marco TF / A6376 Post Request for Bids Open - National 941,000.00 0.00 Implementati 2020-12-28 2020-12-28 2021-01-02 2021-01-04 2021-01-19 2021-02-03 2021-03-10 2021-09-06 Monitoring, Reporting and Envelope estadístico y geoestadístico, on Verification los procedimientos, metodologías y protocolos técnicos definidos por el IDEAM para la impleme Page 1 CO-MADR-218245-NC-RFB / Establecer factores de emisión Definition of Emission Pending para los usos del suelo Reduction Program and Single Stage - One TF / A6376 Post Request for Bids Open - National 772,850.00 0.00 Implementati 2021-03-15 2021-03-20 2021-05-01 2021-05-31 2021-07-05 2022-01-01 distintos a bosque y los Monitoring, Reporting and Envelope on cambios de uso del suelo de la Verification Orinoquia CO-MADR-218458-NC-RFB / Prestar servicios como Integrated Land- Use Operador logístico para la Under Planning and Improved Single Stage - One puesta en marcha de las TF / A6376 Post Request for Bids Open - National 194,750.00 0.00 Implementati 2021-04-22 2021-04-14 2021-04-27 2021-06-08 2021-05-18 2021-07-08 2021-06-03 2021-08-12 2022-02-08 Governance for Deforestation Envelope diferentes actividades y on Control estrategias del proyecto BIOCARBONO CO-MADR-224155-NC-RFQ / Prestar sus servicios profesionales con autonomía técnica y administrativa, para Project Coordination, Pending la grabación, edición, Request for Single Stage - One TF / A6376 Management, Monitoring and Post Open - National 18,187.00 0.00 Implementati 2021-05-08 2021-07-03 2021-12-30 animación y entrega de videos Quotations Envelope Evaluation on y fotografías para el Proyecto Desarrollo Sostenible bajo en carbono en la región de la Orinoquia CO-MADR-218263-NC-RFB / Formular un plan de Integrated Land- Use ordenamiento social de la Planning and Improved Single Stage - One propiedad rural en un TF / A6376 Post Request for Bids Open - National 300,000.00 0.00 Canceled 2021-02-22 2021-02-27 2021-04-10 2021-05-10 2021-06-14 2021-12-11 Governance for Deforestation Envelope municipio priorizado por el Control Proyecto, con base en los lineamientos de la ANT CO-MADR-218264-NC-RFB / Integrated Land- Use Formular dos (2) planes de Planning and Improved Single Stage - One ordenación forestal, con base TF / A6376 Post Request for Bids Open - National 300,000.00 0.00 Canceled 2021-02-22 2021-02-27 2021-04-10 2021-05-10 2021-06-14 2021-12-11 Governance for Deforestation Envelope en los lineamientos de las Control Corporaciones y MADS CO-MADR-231937-NC-DIR / Suministro de tiquetes aéreos Integrated Land- Use Pending de pasajeros en rutas Planning and Improved TF / A6376 Post Direct Selection Direct 45,714.00 0.00 Implementati 2021-04-30 2021-05-05 2021-06-09 2021-12-06 nacionales o internacionales Governance for Deforestation on para el desarrollo del Proyecto Control BIOCARBONO - ORINOQUIA CO-MADR-222433-NC-RFQ / Prestar el servicio de diseño e impresión de afiches, folletos, cartillas, u otras publicaciones a demanda, Project Coordination, Request for Single Stage - One impresas o digitales, hacer las TF / A6376 Management, Monitoring and Post Open - National 30,312.00 0.00 Canceled 2021-03-20 2021-05-15 2021-11-11 Quotations Envelope respectivas gestiones para la Evaluation adquisición del ISBN para las publicaciones que lo requieran, realizar la producción CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-172824-CS-QCBS / “Elaborar los lineamientos y criterios técnicos establecidos en la Ley 1776 "por la cual se Integrated Land- Use crean y se desarrollan las Planning and Improved Quality And Cost- TF / A6377 Post Open - National 72,750.00 69,472.22 Signed 2020-05-08 2020-06-08 2020-05-22 2020-07-05 2020-10-09 2020-07-19 2020-11-27 2020-07-24 2021-01-25 2020-08-13 2021-01-15 2020-09-10 2021-04-27 2021-01-08 zonas de interés de desarrollo Governance for Deforestation Based Selection rural, económico y social, Control ZIDRES"; definiendo las condiciones de presentación, evaluación elegibilidad, CO-MADR-182002-CS-QBS / “Consultoría para la gestión de agroecosistemas ganaderos Sustainable Land- Use Quality Based Under TF / A6377 Prior Open - International 1,000,000.00 0.00 2020-06-30 2020-07-30 2020-07-21 2020-08-12 2020-08-19 2020-12-23 2020-09-03 2021-02-09 2020-09-13 2021-03-23 2020-09-23 2020-10-21 2021-12-15 sostenibles bajos en carbono Management Selection Implementation en paisajes priorizados de la Orinoquia” CO-MADR-183810-CS-QCBS / “Apoyar la estructuración de Sustainable Land- Use Quality And Cost- programas y proyectos de TF / A6377 Post Open - National 181,667.00 163,459.11 Signed 2020-07-13 2020-07-16 2020-07-28 2020-09-26 2020-10-05 2020-10-11 2020-11-20 2020-10-21 2020-12-23 2020-11-15 2020-12-23 2020-12-20 2021-03-23 2021-09-16 Management Based Selection Pagos por Servicios Ambientales CO-MADR-196095-CS-QBS / Consultoría para identificar, validar y socializar modelos productivos sostenibles bajos Sustainable Land- Use Quality Based en carbono para el cultivo de TF / A6377 Post Open - International 600,000.00 368,742.33 Signed 2020-09-30 2020-10-09 2020-10-21 2020-10-30 2020-11-19 2020-12-10 2021-01-03 2021-01-12 2021-01-18 2021-01-29 2021-02-02 2021-01-29 2021-03-02 2021-04-29 2022-03-02 Management Selection arroz en Arauca (Arauca), Paz de Ariporo (Casanare), Villavicencio, Puerto López y Puerto Gaitán (Meta). CO-MADR-197663-CS-CQS / Identificar, documentar, analizar y validar los factores de emisión para plantaciones Definition of Emission forestales de Colombia y en Consultant Reduction Program and Under particular de la región TF / A6377 Post Qualification Open - National 74,538.00 0.00 2020-10-09 2020-10-09 2020-10-13 2020-12-16 2020-12-27 2021-01-01 2021-01-25 2021-07-24 Monitoring, Reporting and Implementation Orinoquia, como insumo del Selection Verification sistema nacional de MRV para AFOLU y a través de un ejercicio concertado entre las entidad CO-MADR-178416-CS-QCBS / Actualizar el inventario de Definition of Emission Gases Efecto Invernadero (GEI) Reduction Program and Quality And Cost- TF / A6377 Post Open - National 85,000.00 0.00 Canceled 2020-06-12 2020-06-10 2020-06-26 2020-08-09 2020-08-23 2020-08-28 2020-09-17 2020-10-15 2020-12-14 de la región de la Orinoquía Monitoring, Reporting and Based Selection con variables representativas Verification (proxy) a escala municipal. CO-MADR-194714-CS-QCBS / Inventario Forestal de la Definition of Emission región de la Orinoquía, dentro Reduction Program and Quality And Cost- del Componente 3: TF / A6377 Post Open - International 941,000.00 0.00 Canceled 2020-09-24 2020-09-23 2020-10-14 2020-09-25 2020-12-13 2020-12-27 2021-01-01 2021-02-05 2021-03-06 2022-03-06 Monitoring, Reporting and Based Selection Preparación del Programa de Verification Reducción de Emisiones y del MRV Page 2 CO-MADR-201847-CS-QCBS / Caracterizar, validar y socializar sistemas agroforestales (SAF) bajos en carbono para el cultivo de Sustainable Land- Use Quality And Cost- Under TF / A6376 Post Open - National 383,000.00 0.00 2020-11-09 2021-06-11 2020-11-30 2021-01-13 2021-02-10 2021-03-12 2021-04-16 2021-05-21 2022-05-21 cacao en las subregiones del Management Based Selection Implementation Sarare (Arauca) y la cuenca alta y media del río Ariari (Meta), en la Orinoquia colombiana CO-MADR-204779-CS-LCS / Realizar la auditoria externa al proyecto Desarrollo Sostenible Project Coordination, Bajo en Carbono para la Least Cost Under TF / A6376 Management, Monitoring and Post Open - National 37,651.00 0.00 2020-11-27 2021-01-28 2020-12-18 2021-01-31 2021-02-04 2021-02-28 2021-03-04 2021-03-30 2021-05-04 2021-06-08 2021-12-05 Orinoquia , para el periodo Selection Implementation Evaluation comprendido entre el 1 de junio del 2019 y hasta el 31 de diciembre de 2020 CO-MADR-218246-CS-QCBS Definition of Emission / Generar factores de emisión Reduction Program and Quality And Cost- Under Tir2 para arroz de secano y TF / A6376 Post Open - National 353,000.00 0.00 2021-02-26 2021-04-27 2021-03-19 2021-05-02 2021-05-30 2021-06-29 2021-08-03 2021-09-07 2022-09-07 Monitoring, Reporting and Based Selection Implementation ganadería de cría en la región Verification de la Orinoquía CO-MADR-218250-CS-LCS / Definition of Emission Diseñar el Plan de financiación Reduction Program and Least Cost para la implementación de las TF / A6376 Post Open - National 80,000.00 0.00 Canceled 2021-02-19 2021-03-12 2021-04-25 2021-05-23 2021-06-22 2021-07-27 2021-08-31 2022-02-27 Monitoring, Reporting and Selection acciones e intervenciones Verification previstas del ERPD CO-MADR-218252-CS-LCS / Implementar las salvaguardas establecidas a nivel nacional, Definition of Emission con las comunidades de la Reduction Program and Least Cost región, y desarrollar los TF / A6376 Post Open - National 75,000.00 0.00 Canceled 2021-03-26 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-04-03 Monitoring, Reporting and Selection reportes de dichas actividades Verification de acuerdo con los lineamientos nacionales (MGAS, PPI, MP) CO-MADR-201848-CS-QCBS / Caracterizar, validar y socializar modelos de producción - conservación Sustainable Land- Use Quality And Cost- Pending TF / A6376 Post Open - National 250,000.00 0.00 2021-03-01 2021-03-22 2021-05-05 2021-06-02 2021-07-02 2021-08-06 2021-09-10 2022-09-10 para el cultivo de marañón Management Based Selection Implementation bajo en carbono a escala de paisaje en la altillanura colombiana CO-MADR-218269-CS-QCBS / Desarrollo de un modelo de negocios para la consolidación de la producción de aceite de palma sostenible en paisajes Sustainable Land- Use Quality And Cost- Pending TF / A6376 Post Open - National 300,000.00 0.00 2021-03-15 2021-04-05 2021-05-19 2021-06-16 2021-07-16 2021-08-20 2021-09-24 2022-09-24 palmeros priorizados a partir Management Based Selection Implementation de la realización de análisis costo - beneficio de mejores prácticas bajas en carbono y el diseño de herrami CO-MADR-218270-CS-CQS / Identificar especies vegetales, desarrollar protocolos y Consultant Sustainable Land- Use Pending fortalecer capacidades para TF / A6376 Post Qualification Open - National 150,000.00 0.00 2021-04-30 2021-05-21 2021-07-04 2021-08-03 2021-09-07 2022-03-06 Management Implementation procesos de reconversión, Selection restauración y fomento de SAF en paisajes priorizados CO-MADR-218271-CS-QCBS / Definir e implementar mesas Sustainable Land- Use Quality And Cost- Under TF / A6376 Post Open - National 300,000.00 0.00 2021-03-01 2021-04-05 2021-03-22 2021-05-05 2021-06-02 2021-07-02 2021-08-06 2021-09-10 2022-09-10 técnicas agroclimáticas en la Management Based Selection Implementation Orinoquia CO-MADR-218275-CS-QCBS / Ajustar los instrumentos de financiamiento e incentivos Sustainable Land- Use Quality And Cost- Pending forestales y de bosques de TF / A6376 Post Open - National 225,000.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-02 2021-08-01 2021-09-05 2021-10-10 2022-10-10 Management Based Selection Implementation conservación y evaluar y/o diseñar instrumentos regulatorios CO-MADR-199060-CS-QCBS / Diseñar, apoyar y hacer recomendaciones a la implementación de acciones Integrated Land- Use dirigidas a la reducción de la Planning and Improved Quality And Cost- TF / A6376 Post Open - International 550,000.00 0.00 Canceled 2020-10-20 2020-11-12 2020-11-03 2020-12-20 2020-12-28 2021-01-05 2021-01-21 2021-02-14 2022-02-14 deforestación, la promoción Governance for Deforestation Based Selection de la legalidad de la cadena Control forestal y la conservación de los bosques en la región de la Orinoquia CO-MADR-222430-CS-LCS / Diseñar un Protocolo con guías de actuación en situaciones de riesgo, crisis comunicativa y reputacional, Project Coordination, Least Cost Pending socializarlo y capacitar a los TF / A6376 Management, Monitoring and Post Open - National 18,826.00 0.00 2021-03-12 2021-04-02 2021-05-16 2021-06-13 2021-07-13 2021-08-17 2021-09-21 2022-03-20 Selection Implementation voceros del Proyecto Evaluation Desarrollo Sostenible bajo en carbono en la región de la Orinoquia, en acuerdo con lo establecid CO-MADR-222431-CS-CQS / Prestar servicios de monitoreo de medios de comunicación nacionales, regionales y Project Coordination, Consultant Pending municipales (prensa escrita, TF / A6376 Management, Monitoring and Post Qualification Limited 10,609.00 0.00 2021-03-15 2021-03-29 2021-04-28 2021-06-02 2021-11-29 Implementation radio, televisión, internet y Evaluation Selection redes sociales) en temas de interés del proyecto Biocarbono Orinoquia Page 3 CO-MADR-222428-CS-QCBS / Prestar sus servicios como central de medios o agencia de medios para el diseño, ejecución y seguimiento de un Project Coordination, Least Cost Pending plan de medios que acompañe TF / A6376 Management, Monitoring and Post Open - National 87,853.00 0.00 2021-04-23 2021-05-14 2021-06-27 2021-07-25 2021-08-24 2021-09-28 2021-11-02 2022-05-01 Selection Implementation la estrategia de Evaluation comunicaciones y participación del Proyecto Desarrollo Sostenible bajo en carbono en la región de l CO-MADR-218256-CS-QCBS Integrated Land- Use / Actualizar y socializar el Planning and Improved Quality And Cost- TF / A6376 Post Open - National 200,000.00 0.00 Canceled 2021-05-31 2021-06-21 2021-08-04 2021-09-01 2021-10-01 2021-11-05 2021-12-10 2022-12-10 MOTRO con el gobierno Governance for Deforestation Based Selection regional actual Control CO-MADR-233553-CS-QCBS / Preparar un plan de financiación y un plan de Definition of Emission distribución de beneficios para Reduction Program and Quality And Cost- Under el Programa de Reducción de TF / A6376 Post Open - National 160,000.00 0.00 2021-05-10 2021-05-27 2021-05-31 2021-07-14 2021-08-11 2021-09-10 2021-10-15 2021-11-19 2022-03-19 Monitoring, Reporting and Based Selection Implementation Emisiones de la región de la Verification Orinoquia en Colombia, a partir de una evaluación de costos y beneficios CO-MADR-218457-CS-QCBS / Diseñar e implementar un programa de formación de formadores en planificación Integrated Land- Use territorial enfocado a bajo Planning and Improved Quality And Cost- Pending carbono, hacedores de TF / A6376 Post Open - National 392,440.00 0.00 2021-08-02 2021-08-23 2021-10-06 2021-11-03 2021-12-03 2022-01-07 2022-02-11 2022-11-08 Governance for Deforestation Based Selection Implementation política, organizaciones, Control EPSEAS y demás temas relacionados con los componentes 1 y 2 del Proyecto BIOCARBONO CO-MADR-218257-CS-CQS / Realizar acompañamiento técnico y jurídico para la Integrated Land- Use Consultant adopción de las determinantes Planning and Improved TF / A6376 Post Qualification Open - National 120,000.00 0.00 Canceled 2021-05-31 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 ambientales regionales en las Governance for Deforestation Selection corporaciones Control (CORPORINOQUIA y CORMACARENA) CO-MADR-218259-CS-CQS / Implementar en los POT de los Integrated Land- Use Consultant municipios priorizados del Planning and Improved TF / A6376 Post Qualification Open - National 150,000.00 0.00 Canceled 2021-05-31 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 Vichada, acciones de gestión Governance for Deforestation Selection de cambio climático basado en Control EEP CO-MADR-240660-CS-QCBS / Incorporar la gestión del cambio climático en las Integrated Land- Use determinantes ambientales Planning and Improved Quality And Cost- Pending (CORPORINOQUIA - TF / A6376 Post Open - National 270,000.00 0.00 2021-07-12 2021-08-02 2021-09-15 2021-10-13 2021-11-12 2021-12-17 2022-01-21 2023-01-21 Governance for Deforestation Based Selection Implementation CORMACARENA) y desarrollar Control un piloto a escala local a través del modelo de estructura ecológica principal CO-MADR-218266-CS-QCBS / Construir el plan de acción para la implementación de la estrategia integral de control Integrated Land- Use de la deforestación y Planning and Improved Quality And Cost- Pending TF / A6376 Post Open - National 300,000.00 0.00 2021-08-05 2021-08-26 2021-10-09 2021-11-06 2021-12-06 2022-01-10 2022-02-14 2023-02-14 propuesta de fortalecimiento Governance for Deforestation Based Selection Implementation de capacidades e Control involucramiento de actores, con énfasis en las autoridades ambientales y municipales CO-MADR-218273-CS-QCBS / Diseñar la estrategia de gestión del conocimiento para Sustainable Land- Use Quality And Cost- el desarrollo regional bajo en TF / A6376 Post Open - National 80,000.00 0.00 Canceled 2021-04-30 2021-05-21 2021-07-04 2021-08-01 2021-08-31 2021-10-05 2021-11-09 2022-11-09 Management Based Selection carbono de la Orinoquia y la consolidación de circuitos cortos bajos en carbono CO-MADR-218251-CS-LCS / Definition of Emission Construir propuestas de Reduction Program and Least Cost TF / A6376 Post Open - National 60,000.00 0.00 Canceled 2021-03-26 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-04-03 articulación en áreas de Monitoring, Reporting and Selection traslape Verification CO-MADR-218253-CS-LCS / Definition of Emission Diseñar el Plan de distribución Reduction Program and Least Cost de beneficios del Programa de TF / A6376 Post Open - National 80,000.00 0.00 Canceled 2021-03-26 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-04-03 Monitoring, Reporting and Selection Reducción de Emisiones de la Verification Orinoquia CO-MADR-218254-CS-CQS / Realizar el proceso de Definition of Emission Consultant mejoramiento de información Reduction Program and TF / A6376 Post Qualification Open - National 60,000.00 0.00 Canceled 2021-02-26 2021-03-19 2021-05-02 2021-06-01 2021-07-06 2022-01-02 y de los sistemas de Monitoring, Reporting and Selection información relacionados con Verification tierras forestales (SNIF) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-99638-CS-INDV / Project Coordination, Individual Profesional de adquisiciones TF / A6377 Management, Monitoring and Post Consultant Open 24,500.00 55,379.34 Completed 2019-02-11 2019-02-26 2019-02-21 2019-04-10 2019-02-22 2019-04-19 2019-03-01 2019-06-04 2020-03-01 2020-02-20 para la UIP del proyecto Evaluation Selection CO-MADR-99663-CS-INDV / Project Coordination, Individual Profesional financiero para el TF / A6377 Management, Monitoring and Post Consultant Open 24,500.00 54,491.02 Signed 2019-02-11 2019-02-26 2019-02-19 2019-04-10 2019-02-20 2019-04-19 2019-03-01 2019-06-04 2019-08-28 apoyo en la UIP Evaluation Selection CO-MADR-99665-CS-INDV / Project Coordination, Individual Coordinador general para la TF / A6377 Management, Monitoring and Post Consultant Open 45,000.00 79,276.45 Completed 2019-02-11 2019-02-13 2019-02-19 2019-04-10 2019-02-22 2019-04-19 2019-03-01 2019-06-04 2019-08-28 2020-04-07 UPI Evaluation Selection Page 4 CO-MADR-99654-CS-INDV / Asistente administrativo y Project Coordination, Individual operativo para apoyar al TF / A6377 Management, Monitoring and Post Consultant Open 48,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 IDEAM en la coordinación de Evaluation Selection las acciones de gestión del programa CO-MADR-99650-CS-INDV / Seis consultores que obtengan los insumos para la Project Coordination, Individual elaboración del ER-Programa TF / A6377 Management, Monitoring and Post Consultant Open 210,000.00 0.00 Canceled 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2019-11-30 desde las instituciones Evaluation Selection gubernamentales (MADS, MADR, UPRA, DNP, FINAGRO, PRICCO) CO-MADR-107364-CS-INDV Project Coordination, Individual / Apoyo Administrativo a la TF / A6377 Management, Monitoring and Post Consultant Open 17,000.00 31,945.63 Signed 2019-04-05 2019-06-25 2019-04-19 2019-08-06 2019-04-23 2019-09-02 2019-05-01 2019-09-12 2019-12-31 Unidad de Implementación del Evaluation Selection proyecto CO-MADR-107357-CS-INDV / Líder Especialista en Project Coordination, Individual Planificación y Políticas TF / A6377 Management, Monitoring and Post Consultant Open 23,900.00 35,046.00 Signed 2019-04-05 2019-06-18 2019-04-22 2019-08-13 2019-04-25 2019-09-13 2019-05-01 2019-10-25 2019-12-31 Públicas en la Unidad de Evaluation Selection Implementación del Proyecto CO-MADR-107358-CS-INDV / Líder Especialista en Project Coordination, Individual Monitoreo de la Unidad de TF / A6377 Management, Monitoring and Post Consultant Open 28,120.00 41,839.39 Signed 2019-04-05 2019-06-18 2019-04-22 2019-08-02 2019-04-25 2019-08-28 2019-05-01 2019-10-25 2019-12-31 Implementación del Proyecto Evaluation Selection MADR CO-MADR-107362-CS-INDV / Asesor de Comunicaciones y Project Coordination, Individual Participación de la Unidad de TF / A6377 Management, Monitoring and Post Consultant Open 23,900.00 45,256.30 Completed 2019-04-05 2019-06-25 2019-04-22 2019-08-09 2019-04-25 2019-08-02 2019-05-01 2019-09-12 2019-12-31 2020-04-07 Implementación del Proyecto Evaluation Selection MADR CO-MADR-107363-CS-INDV / Líder Especialista en Project Coordination, Individual Desarrollo Rural de Bajas TF / A6377 Management, Monitoring and Post Consultant Open 28,000.00 41,230.59 Signed 2019-04-05 2019-06-18 2019-04-22 2019-08-02 2019-04-25 2019-08-28 2019-05-01 2019-10-25 2019-12-31 Emisiones de la Unidad de Evaluation Selection Implementación del proyecto MADR CO-MADR-132927-CS-INDV Project Coordination, Individual / Apoyo Departamental TF / A6377 Management, Monitoring and Post Consultant Open 10,833.00 48,997.23 Signed 2019-09-05 2019-08-01 2019-09-05 2019-09-05 2019-09-05 2019-10-18 2019-09-12 2019-11-15 2019-12-31 Arauca - Primer (1)año Evaluation Selection CO-MADR-132931-CS-INDV Project Coordination, Individual / Apoyo Departamental TF / A6377 Management, Monitoring and Post Consultant Open 10,833.00 48,320.94 Signed 2019-09-05 2019-08-01 2019-09-05 2019-10-18 2019-09-05 2019-10-17 2019-09-12 2019-11-25 2019-12-31 Casanare (1) primer año Evaluation Selection CO-MADR-132935-CS-INDV Project Coordination, Individual / Apoyo Departamental Meta TF / A6377 Management, Monitoring and Post Consultant Open 10,833.00 48,997.23 Signed 2019-09-05 2019-08-01 2019-09-05 2019-10-08 2019-09-05 2019-10-18 2019-09-12 2019-11-15 2019-12-31 - Primer (1)año Evaluation Selection CO-MADR-132937-CS-INDV Project Coordination, Individual / Apoyo Departamental TF / A6377 Management, Monitoring and Post Consultant Open 10,833.00 25,176.86 Signed 2019-09-05 2019-08-01 2019-09-05 2019-09-05 2019-09-05 2019-09-05 2019-09-12 2019-12-02 2019-12-31 Vichada - Primer (1) año Evaluation Selection CO-MADR-153426-CS-CDS / Prestar sus servicios profesionales con autonomía técnica apoyando a la Definition of Emission Subdirección de Estudios Individual Reduction Program and Ambientales del el Instituto de TF / A6377 Post Consultant Direct 34,320.00 25,510.40 Signed 2020-02-06 2020-02-11 2020-02-27 2020-02-13 2020-03-03 2020-02-13 2020-03-13 2020-03-10 2021-03-13 Monitoring, Reporting and Hidrología, Meteorología y Selection Verification Estudios Ambientales IDEAM, como profesional experto en los análisis espaciales y estructuración de CO-MADR-143405-CS-INDV Project Coordination, Individual / Especialista en comunicación TF / A6377 Management, Monitoring and Post Consultant Open 28,000.00 13,851.04 Signed 2019-10-29 2019-10-30 2019-11-06 2020-01-28 2019-11-27 2020-02-04 2020-02-18 2020-03-03 2020-08-16 Digital Evaluation Selection CO-MADR-143406-CS-INDV Project Coordination, Individual / Profesional en medios e TF / A6377 Management, Monitoring and Post Consultant Open 2,000.00 1,484.04 Signed 2019-10-29 2019-10-30 2019-11-06 2020-01-31 2019-11-26 2020-02-07 2020-02-24 2020-03-03 2020-05-08 Identidad Grafica Evaluation Selection CO-MADR-148038-CS-INDV / Gestor Técnico, para la implementación y seguimiento técnico del componente 1 del Integrated Land- Use Proyecto: Desarrollo Individual Planning and Improved Sostenible bajo en carbono en TF / A6377 Post Consultant Open 34,000.00 25,368.42 Completed 2020-02-24 2020-03-12 2020-03-21 2020-05-29 2020-03-26 2020-04-23 2020-04-09 2020-05-01 2021-04-09 2020-05-01 Governance for Deforestation la región de la Orinoquia, Selection Control específicamente apoyando el desarrollo de la arquitecturafuncional y de componentes del sistema CO-MADR-153424-CS-CDS / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Subdirección de Estudios Definition of Emission Individual Ambientales del el Instituto de Reduction Program and TF / A6377 Post Consultant Direct 34,320.00 25,358.02 Signed 2020-02-06 2020-02-11 2020-02-27 2020-02-13 2020-03-03 2020-02-13 2020-03-13 2020-03-06 2021-03-13 Hidrología, Meteorología y Monitoring, Reporting and Selection Estudios Ambientales IDEAM, Verification como profesional agropecuario para la caracterización y seguimiento de CO-MADR-132919-CS-INDV Project Coordination, Individual / Especialista Sector privado TF / A6377 Management, Monitoring and Post Consultant Open 12,500.00 58,528.16 Signed 2019-09-05 2019-08-01 2019-09-05 2019-09-30 2019-09-05 2019-09-30 2019-09-12 2019-11-26 2020-07-26 - año 1 Evaluation Selection CO-MADR-153423-CS-CDS / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Subdirección de Estudios Individual Reduction Program and Ambientales del el Instituto de TF / A6377 Post Consultant Direct 34,320.00 25,510.40 Signed 2020-02-06 2020-02-11 2020-02-27 2020-04-13 2020-03-03 2020-02-13 2020-03-13 2020-03-06 2021-03-13 Monitoring, Reporting and Hidrología, Meteorología y Selection Verification Estudios Ambientales IDEAM, como profesional experto en análisis espaciales para la recopilación, Page 5 CO-MADR-153429-CS-CDS / Prestar sus servicios profesionales con autonomía técnica apoyando a la Definition of Emission Subdirección de Estudios Individual Reduction Program and Ambientales del el Instituto de TF / A6377 Post Consultant Direct 31,680.00 25,189.40 Signed 2020-02-06 2020-02-11 2020-02-27 2020-06-08 2020-03-03 2020-06-08 2020-03-13 2020-07-15 2021-03-13 Monitoring, Reporting and Hidrología, Meteorología y Selection Verification Estudios Ambientales IDEAM, liderando la articulación de los procesos de Monitoreo Comunitario Par CO-MADR-132940-CS-INDV Project Coordination, Individual / Coordinador Regional - TF / A6377 Management, Monitoring and Post Consultant Open 38,000.00 28,352.94 Signed 2020-09-06 2020-01-08 2020-09-06 2020-02-07 2020-09-06 2020-03-03 2020-09-13 2020-03-06 2021-01-01 Primer (1) año Evaluation Selection CO-MADR-153428-CS-CDS / Prestar sus servicios profesionales con autonomía técnica apoyando a la Definition of Emission Subdirección de Estudios Individual Reduction Program and Ambientales del el Instituto de TF / A6377 Post Consultant Direct 37,180.00 27,636.27 Signed 2020-02-06 2020-02-11 2020-02-27 2020-02-13 2020-03-03 2020-02-13 2020-03-13 2020-03-06 2021-03-13 Monitoring, Reporting and Hidrología, Meteorología y Selection Verification Estudios Ambientales IDEAM, asesorando estadísticamente los procesos necesarios para el levantamien Integrated Land- Use Individual CO-MADR-142886-CS-INDV Planning and Improved TF / A6377 Post Consultant Open 34,000.00 25,649.94 Signed 2020-02-20 2019-12-05 2020-03-16 2020-02-18 2020-03-21 2020-03-16 2020-04-06 2020-03-17 2021-04-06 / GESTOR TECNICO DNP Governance for Deforestation Selection Control Integrated Land- Use Individual CO-MADR-146069-CS-INDV Planning and Improved TF / A6377 Post Consultant Open 6,000.00 4,476.78 Signed 2020-02-20 2019-12-05 2020-03-06 2020-02-27 2020-03-14 2020-02-27 2020-03-27 2020-03-26 2020-07-25 / PROFESIONAL ZIDRES 4 Governance for Deforestation Selection Control Integrated Land- Use Individual CO-MADR-146065-CS-INDV Planning and Improved TF / A6377 Post Consultant Open 6,000.00 4,526.46 Signed 2020-02-27 2019-12-05 2020-02-28 2020-02-27 2020-02-28 2020-02-27 2020-03-09 2020-03-25 2020-07-07 / PROFESIONAL ZIDRES 1 Governance for Deforestation Selection Control Integrated Land- Use Individual CO-MADR-146066-CS-INDV Planning and Improved TF / A6377 Post Consultant Open 6,000.00 4,476.78 Signed 2020-02-20 2019-12-05 2020-03-06 2020-02-27 2020-03-14 2020-02-27 2020-03-23 2020-03-26 2020-07-21 / PROFESIONAL ZIDRES 2 Governance for Deforestation Selection Control Integrated Land- Use Individual CO-MADR-146068-CS-INDV Planning and Improved TF / A6377 Post Consultant Open 6,000.00 4,476.78 Signed 2020-02-20 2019-12-05 2020-03-06 2020-02-27 2020-03-14 2020-02-27 2020-03-27 2020-03-26 2020-07-25 / PROFESIONAL ZIDRES 3 Governance for Deforestation Selection Control CO-MADR-159519-CS-INDV / Prestar sus servicios profesionales como consultor SOCIAL de salvaguardas con Definition of Emission autonomía técnica y Individual Reduction Program and administrativa, apoyando a la TF / A6377 Post Consultant Open 34,000.00 25,121.58 Completed 2020-02-20 2020-02-13 2020-03-25 2020-03-09 2020-03-30 2020-04-11 2020-04-10 2020-04-02 2021-04-10 2020-07-28 Monitoring, Reporting and Unidad Implementadora del Selection Verification Proyecto, UIP, al Ministerio de Agricultura y Desarrollo Rural, bajo la orientación del Ministerio de CO-MADR-159520-CS-INDV / Prestar sus servicios profesionales como consultor AMBIENTAL de salvaguardas Definition of Emission con autonomía técnica y Individual Reduction Program and administrativa, apoyando a la TF / A6377 Post Consultant Open 34,000.00 25,121.58 Signed 2020-02-20 2020-02-13 2020-03-25 2020-03-09 2020-03-30 2020-03-11 2020-04-15 2020-04-02 2021-04-15 Monitoring, Reporting and Unidad Implementadora del Selection Verification Proyecto UIP: Desarrollo sostenible bajo en carbono en la región de la Orinoquia, al Ministerio de CO-MADR-159522-CS-INDV / Prestar sus servicios profesionales, con autonomía técnica y administrativa, apoyando a la Dirección de Project Coordination, Individual Under Innovación, Desarrollo TF / A6377 Management, Monitoring and Post Consultant Open 34,000.00 31,046.40 2020-02-20 2020-03-04 2020-03-25 2020-06-23 2020-03-30 2020-06-23 2020-04-14 2021-04-14 Implementation Tecnológico y Protección Evaluation Selection Sanitaria del Ministerio de Agricultura y Desarrollo Rural, en la realización de los procesos de adqui Definition of Emission CO-MADR-151449-CS-INDV Individual Reduction Program and / Profesional Programador TF / A6377 Post Consultant Open 26,667.00 0.00 Canceled 2020-01-13 2020-01-13 2020-01-13 2020-02-17 2021-02-17 Monitoring, Reporting and senior Selection Verification CO-MADR-99651-CS-INDV / Un consultor para implementar una plataforma Project Coordination, Individual de gestión del conocimiento y TF / A6377 Management, Monitoring and Post Consultant Open 35,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 experiencias en el diseño e Evaluation Selection implementación de ER- Program CO-MADR-99659-CS-INDV / Líder técnico especialista en uso y cambios de uso del Project Coordination, Individual suelo de apoyo al IDEAM en la TF / A6377 Management, Monitoring and Post Consultant Open 72,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 estimación y el reporte de Evaluation Selection emisiones y remociones de GEI para el sector AFOLU Definition of Emission CO-MADR-151447-CS-INDV Individual Reduction Program and / Profesional Interprete 1 TF / A6377 Post Consultant Open 20,000.00 0.00 Canceled 2020-01-17 2020-01-17 2020-01-17 2020-02-21 2020-11-04 Monitoring, Reporting and (junior) Selection Verification CO-MADR-151444-CS-INDV / Profesional experto tematico para fortalecer capacidades del ideam en analisis de Definition of Emission Individual cambio de uso del suelo , en Reduction Program and TF / A6377 Post Consultant Direct 26,667.00 0.00 Canceled 2020-01-10 2020-01-20 2020-02-10 2020-03-16 2021-03-16 las cateforias claves a ser Monitoring, Reporting and Selection incluidas en la estimacion de Verification liena base , escenario de referencia y los reportes del PRE Page 6 CO-MADR-99656-CS-INDV / Dos analistas de datos que fortalezcan las capacidades Project Coordination, Individual del IDEAM de estimación y TF / A6377 Management, Monitoring and Post Consultant Open 96,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 reporte de emisiones y Evaluation Selection remociones de GEI para el sector AFOLU CO-MADR-99653-CS-INDV / Consultor senior para la Project Coordination, Individual consolidación coordinada del TF / A6377 Management, Monitoring and Post Consultant Open 100,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 ER-Program a partir de Evaluation Selection insumos técnicos específicos generados. CO-MADR-99657-CS-INDV / Líder técnico especialista en Actividades agrícolas que Project Coordination, Individual fortalezca las capacidades del TF / A6377 Management, Monitoring and Post Consultant Open 72,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 IDEAM de estimación y Evaluation Selection reporte, de emisiones y remociones de GEI para el sector AFOLU CO-MADR-157971-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la Dirección de Individual Sustainable Land- Use Innovación, Desarrollo TF / A6377 Post Consultant Open 50,000.00 0.00 Canceled 2020-02-06 2020-03-11 2020-03-18 2020-04-01 2020-11-02 Management Tecnológico y Protección Selection Sanitaria del Ministerio de Agricultura y Desarrollo Rural como profesional de apoyo para la formulación Individual CO-MADR-162169-CS-INDV Sustainable Land- Use TF / A6377 Post Consultant Open 19,500.00 14,494.55 Signed 2020-02-28 2020-02-19 2020-03-23 2020-04-16 2020-03-23 2020-04-21 2020-04-10 2020-06-02 2020-08-08 / Profesional Pdeas meta Management Selection Individual CO-MADR-158772-CS-INDV Sustainable Land- Use TF / A6377 Post Consultant Open 19,500.00 14,494.55 Signed 2020-02-28 2020-02-29 2020-03-23 2020-04-16 2020-03-23 2020-04-16 2020-04-10 2020-06-02 2020-08-08 / Profesional P DEAs vichada Management Selection Individual CO-MADR-162170-CS-INDV Sustainable Land- Use TF / A6377 Post Consultant Open 19,500.00 14,549.54 Signed 2020-02-28 2020-03-19 2020-03-23 2020-04-17 2020-03-23 2020-04-23 2020-04-10 2020-06-02 2020-08-08 / Profesional P DEAs Casanare Management Selection Individual CO-MADR-162171-CS-INDV Sustainable Land- Use TF / A6377 Post Consultant Open 19,500.00 14,494.55 Signed 2020-02-28 2020-02-19 2020-03-23 2020-04-21 2020-03-23 2020-04-21 2020-04-10 2020-06-02 2020-08-08 / Profesional P DEAS ARAUCA Management Selection Definition of Emission CO-MADR-143404-CS-INDV Individual Reduction Program and / Apoyo Administrativo - TF / A6377 Post Consultant Open 11,000.00 14,818.43 Signed 2019-10-29 2019-11-29 2019-11-05 2020-04-25 2020-02-14 2020-01-31 2020-02-19 2020-02-17 2020-08-17 Monitoring, Reporting and IDEAM - Primer año Selection Verification Definition of Emission CO-MADR-156564-CS-INDV Individual Reduction Program and / profesional ambiental- TF / A6377 Post Consultant Open 34,000.00 0.00 Canceled 2020-02-20 2020-03-30 2020-04-20 2020-04-30 2021-04-30 Monitoring, Reporting and salvaguardas Selection Verification Definition of Emission CO-MADR-156563-CS-INDV Individual Reduction Program and / profesional social - TF / A6377 Post Consultant Open 34,000.00 0.00 Canceled 2020-02-20 2020-03-30 2020-04-20 2020-04-30 2021-04-30 Monitoring, Reporting and salvaguardas Selection Verification CO-MADR-163818-CS-INDV / Prestar sus servicios profesionales como coordinador del proceso del Definition of Emission estimación y reporte de Reduction Program and emisiones y remociones de GI TF / A6377 Post Direct Selection Direct 46,000.00 27,353.81 Signed 2020-04-14 2020-04-16 2020-04-24 2020-04-20 2020-05-16 2020-06-03 2021-05-16 Monitoring, Reporting and para AFOLU en la Orinoquía, Verification en las categorías relacionadas con actividades agrícolas y su inclusión en el MRV del proyecto CO-MADR-163817-CS-INDV / Prestar sus servicios profesionales, como coordinador del proceso de Definition of Emission estimación y reporte de Reduction Program and emisiones y remociones de GEI TF / A6377 Post Direct Selection Direct 46,000.00 27,353.81 Signed 2020-04-14 2020-04-16 2020-04-24 2020-04-20 2020-05-16 2020-06-03 2021-05-16 Monitoring, Reporting and para el sector AFOLU de la Verification región de la Orinoquía, en las categorías relacionadas con uso y cambios de uso de la tierra CO-MADR-168115-CS-INDV Project Coordination, Individual / Coordinador General del TF / A6377 Management, Monitoring and Post Consultant Open 70,000.00 44,839.76 Signed 2020-04-15 2020-04-21 2020-05-06 2020-05-13 2020-05-11 2020-05-13 2020-05-21 2020-06-12 2020-12-31 Proyecto Evaluation Selection CO-MADR-149179-CS-INDV Project Coordination, Individual / Profesional de Comunicación TF / A6377 Management, Monitoring and Post Consultant Open 18,750.00 0.00 Canceled 2020-02-11 2020-03-31 2020-03-31 2020-05-05 2020-12-25 e intercambio de información Evaluation Selection de los resultados del proyecto Definition of Emission CO-MADR-172096-CS-INDV Individual Reduction Program and / Consultor modelamiento del TF / A6377 Post Consultant Open 21,243.00 19,476.72 Signed 2020-05-04 2020-05-06 2020-05-28 2020-07-10 2020-06-02 2020-07-17 2020-06-17 2020-08-20 2021-06-17 Monitoring, Reporting and riesgo SMByC Selection Verification CO-MADR-172097-CS-INDV Definition of Emission Individual / Experto encargado de la Reduction Program and TF / A6377 Post Consultant Open 22,449.00 32,232.00 Signed 2020-05-04 2020-10-07 2020-05-28 2020-10-28 2020-06-02 2020-10-30 2020-06-17 2021-01-04 2021-06-17 coordinación para elaboración Monitoring, Reporting and Selection del ERPD para la Orinoquia Verification CO-MADR-172098-CS-INDV Definition of Emission Individual / Intérpretes de imágenes Reduction Program and TF / A6377 Post Consultant Open 48,000.00 19,476.72 Signed 2020-05-04 2020-05-06 2020-05-28 2020-07-16 2020-06-02 2020-07-17 2020-06-17 2020-08-20 2021-06-17 satelitales para el Cubo de Monitoring, Reporting and Selection datos de IDEAM (x2) Verification Page 7 CO-MADR-172808-CS-CDS / Consultor junior en suelos gestionados : Prestar sus servicios profesionales apoyando a la Subdirección Definition of Emission Individual del IDEAM, en el proceso de Reduction Program and TF / A6377 Post Consultant Direct 26,000.00 20,673.12 Signed 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 incorporación de las Monitoring, Reporting and Selection metodologías paraa Verification estimación de las emisiones asociadas a los suelos gestionados en el sector AFOLU Definition of Emission CO-MADR-172107-CS-CDS / Individual Reduction Program and Líder temático del Cubo de TF / A6377 Post Consultant Direct 35,200.00 25,443.84 Signed 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 Monitoring, Reporting and datos de IDEAM Selection Verification CO-MADR-172800-CS-CDS / Consultor junior para el sector de uso y cambio de uso de la tierra: Hidrología, Definition of Emission Meteorología y Estudios Individual Reduction Program and Ambientales IDEAM, en el TF / A6377 Post Consultant Direct 26,000.00 22,263.36 Signed 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 Monitoring, Reporting and proceso de estimación y Selection Verification reporte de emisiones y remociones de GEI para el sector AFOLU de la región de la Orinoquía, en las c CO-MADR-172806-CS-CDS / Consultor temático en ganadería: Prestar sus servicios profesionales apoyando a la Subdirección de Definition of Emission Individual Estudios Ambientales del Reduction Program and TF / A6377 Post Consultant Direct 26,000.00 20,673.12 Signed 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 Instituto de Hidrología, Monitoring, Reporting and Selection Meteorología y Estudios Verification Ambientales IDEAM, en el proceso de ajuste de las metodologías para la estimación CO-MADR-172796-CS-CDS / Consultor junior en actividades agrícolas: Prestar sus servicios profesionales Definition of Emission apoyando a la Subdirección de Individual Reduction Program and Estudios Ambientales del TF / A6377 Post Consultant Direct 26,000.00 22,263.36 Signed 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 Monitoring, Reporting and Instituto de Hidrología, Selection Verification Meteorología y Estudios Ambientales IDEAM, en el proceso de estimación y reporte de emisiones y Integrated Land- Use CO-MADR-178996-CS-INDV Individual Planning and Improved / Apoyo Administrativo Cartas TF / A6377 Post Consultant Open 4,970.00 3,853.34 Signed 2020-06-10 2020-06-12 2020-07-04 2020-10-09 2020-07-09 2020-10-13 2020-08-06 2020-11-11 2021-01-03 Governance for Deforestation del paisaje UIP-UPRA Selection Control CO-MADR-178997-CS-INDV Integrated Land- Use Individual / Profesional en análisis de Planning and Improved TF / A6377 Post Consultant Open 10,833.00 8,802.95 Signed 2020-06-10 2020-06-12 2020-07-04 2020-07-29 2020-07-09 2020-08-19 2020-08-06 2020-09-17 2021-01-03 sistemas productivos agrícolas Governance for Deforestation Selection del paisaje agropecuario Control CO-MADR-178999-CS-INDV Integrated Land- Use Individual / Profesional en análisis Planning and Improved TF / A6377 Post Consultant Open 12,008.00 9,418.38 Signed 2020-06-10 2020-06-12 2020-07-04 2020-08-05 2020-07-09 2020-08-06 2020-07-24 2020-09-28 2020-12-21 ambiental y Ecológico del Governance for Deforestation Selection paisaje agropecuario Control CO-MADR-179001-CS-INDV Integrated Land- Use Individual / Profesional en comunicación Planning and Improved TF / A6377 Post Consultant Open 10,833.00 8,399.30 Signed 2020-06-10 2020-06-12 2020-07-04 2020-07-29 2020-07-09 2020-08-05 2020-08-06 2020-11-03 2021-01-03 social para el desarrollo del Governance for Deforestation Selection paisaje agropecuario Control CO-MADR-179002-CS-INDV Integrated Land- Use Individual / Profesional en análisis Planning and Improved TF / A6377 Post Consultant Open 12,008.00 9,418.38 Signed 2020-06-10 2020-06-12 2020-07-04 2020-08-03 2020-07-09 2020-08-19 2020-08-06 2020-09-17 2021-01-03 económico del paisaje Governance for Deforestation Selection agropecuario Control Integrated Land- Use CO-MADR-179003-CS-INDV Individual Planning and Improved / Profesional en Ordenamiento TF / A6377 Post Consultant Open 14,355.00 11,258.91 Signed 2020-06-10 2020-06-12 2020-07-04 2020-07-27 2020-07-09 2020-07-28 2020-08-06 2020-09-17 2021-01-03 Governance for Deforestation territorial y prospectiva Selection Control CO-MADR-179004-CS-INDV Integrated Land- Use / Profesional en análisis de Individual Planning and Improved sistemas productivos TF / A6377 Post Consultant Open 10,833.00 8,496.80 Signed 2020-06-10 2020-06-12 2020-07-04 2020-07-29 2020-07-09 2020-07-29 2020-08-06 2020-09-28 2021-01-03 Governance for Deforestation pecuarios del paisaje Selection Control agropecuario CO-MADR-181730-CS-INDV / Gestor Técnico gestión de la Integrated Land- Use información apoyando al Individual Planning and Improved Departamento Nacional de TF / A6377 Post Consultant Direct 34,000.00 0.00 Canceled 2020-06-24 2020-06-29 2020-07-04 2020-07-19 2021-07-19 Governance for Deforestation Planeación, DNP para la Selection Control implementación y seguimiento técnico del componente 1 Definition of Emission CO-MADR-181986-CS-INDV Individual Reduction Program and / Consultor técnico de cambio TF / A6377 Post Consultant Open 32,728.00 28,674.00 Signed 2020-06-25 2020-06-26 2020-07-24 2020-08-26 2020-07-29 2020-08-26 2020-08-20 2020-09-29 2021-08-20 Monitoring, Reporting and climático para el MADS Selection Verification Definition of Emission Individual CO-MADR-181989-CS-INDV Reduction Program and TF / A6377 Post Consultant Open 32,728.00 28,235.52 Signed 2020-06-25 2020-06-26 2020-07-24 2020-08-26 2020-07-29 2020-09-02 2020-08-20 2020-09-28 2021-08-20 / Asesor jurídico y legal Monitoring, Reporting and Selection Verification CO-MADR-182723-CS-INDV / Gestor Técnico gestión de la Integrated Land- Use información apoyando al Individual Planning and Improved Departamento Nacional de TF / A6377 Post Consultant Direct 34,000.00 28,031.64 Signed 2020-06-30 2020-03-12 2020-07-10 2020-05-29 2020-07-15 2020-05-29 2020-08-04 2020-07-15 2021-08-04 Governance for Deforestation Planeación, DNP para la Selection Control implementación y seguimiento técnico del componente 1 CO-MADR-182724-CS-INDV Integrated Land- Use Individual / Profesional experto en Planning and Improved TF / A6377 Post Consultant Open 13,388.00 11,046.58 Signed 2020-07-03 2020-07-16 2020-08-01 2020-09-21 2020-08-06 2020-09-24 2020-08-30 2020-12-17 2021-01-27 desarrollo sostenible bajo en Governance for Deforestation Selection carbono Control Page 8 CO-MADR-184009-CS-INDV Integrated Land- Use Individual / Profesional ecología del Planning and Improved TF / A6377 Post Consultant Direct 13,388.33 31,187.32 Signed 2020-07-15 2020-07-16 2020-07-25 2020-08-14 2020-07-30 2020-08-19 2020-08-23 2020-09-03 2021-01-20 paisaje y sensoramiento Governance for Deforestation Selection remoto Control CO-MADR-190104-CS-CDS / Actualización de los inventarios de GEI con proxys Definition of Emission para los 59 municipios de la Reduction Program and región de la Orinoquía, dentro TF / A6377 Post Direct Selection Direct 85,000.00 84,982.67 Signed 2020-08-24 2020-08-25 2020-09-24 2020-09-28 2020-10-28 2021-02-01 2020-12-27 Monitoring, Reporting and del Componente 3: Verification Preparación del Programa de Reducción de Emisiones y del MRV CO-MADR-190915-CS-INDV / Prestar sus servicios profesionales como consultor SOCIAL de salvaguardas con Definition of Emission autonomía técnica apoyando a Individual Reduction Program and la Unidad Implementadora del TF / A6377 Post Consultant Direct 34,000.00 27,592.02 Signed 2020-08-27 2020-08-31 2020-08-29 2020-08-27 2020-09-03 2020-08-27 2020-10-01 2020-09-28 2021-10-01 Monitoring, Reporting and Proyecto, UIP, al Ministerio de Selection Verification Agricultura y Desarrollo Rural, bajo la orientación del Ministerio de Ambiente y Desarr CO-MADR-194082-CS-INDV / Prestar sus servicios profesionales en la realización de los procesos de adquisiciones y contrataciones Project Coordination, Individual que se requieran, de acuerdo TF / A6377 Management, Monitoring and Post Consultant Direct 47,287.00 40,784.64 Signed 2020-09-17 2020-09-18 2020-09-21 2020-09-16 2020-09-23 2020-09-16 2020-10-12 2020-10-16 2021-10-12 con lo establecido en el Evaluation Selection Acuerdo Legal, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las Regulaciones de CO-MADR-197661-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Subdirección de Estudios Individual Reduction Program and Under Ambientales del IDEAM como TF / A6377 Post Consultant Open 21,825.00 0.00 2020-10-21 2020-11-17 2020-11-20 2020-11-20 2020-12-09 2021-12-09 Monitoring, Reporting and Implementation profesional experto para Selection Verification realizar la descarga y procesamiento de imágenes, interpretación digital, validación, reporte y ajustes n CO-MADR-199053-CS-INDV / Prestar sus servicios profesionales apoyando a la Secretaria técnica del Nodo Integrated Land- Use Regional de Cambio Climático Individual Planning and Improved de la Orinoquia – NORECCO TF / A6376 Post Consultant Open 28,991.00 27,892.92 Signed 2020-10-14 2020-12-29 2020-11-14 2021-01-19 2020-11-16 2021-04-10 2020-12-05 2021-05-04 2021-12-05 Governance for Deforestation (CORMACARENA), como Selection Control consultor de apoyo para orientar, implementar y hacer seguimiento a la estrategia de Fortalecimiento d CO-MADR-199054-CS-INDV / consultor de apoyo técnico para la implementación y Integrated Land- Use seguimiento de medidas de Individual Planning and Improved cambio climático territoriales, TF / A6376 Post Consultant Open 100,905.00 85,326.92 Signed 2020-10-14 2021-01-18 2020-11-14 2021-01-21 2020-11-16 2021-04-12 2020-12-05 2021-05-07 2021-12-05 Governance for Deforestation con un enfoque al Selection Control ordenamiento territorial y el fomento de un desarrollo sostenible bajo en carbono (4) CO-MADR-199055-CS-INDV / facilitador para preparar el diseño metodológico, realizar Integrated Land- Use Individual la moderación, desarrollar, Planning and Improved TF / A6376 Post Consultant Open 25,226.00 21,480.47 Signed 2020-10-14 2020-12-29 2020-11-14 2021-02-08 2020-11-16 2021-04-06 2020-12-05 2021-05-07 2021-12-05 analizar, documentar y Governance for Deforestation Selection sistematizar los espacios de Control participación y para la socio construcción del conocimiento CO-MADR-199058-CS-INDV / consultor de apoyo técnico para la implementación y seguimiento de medidas de Integrated Land- Use Individual cambio climático en el Planning and Improved TF / A6376 Post Consultant Open 25,226.00 21,480.47 Signed 2020-10-14 2020-12-29 2020-11-14 2021-02-08 2020-11-16 2021-04-08 2020-12-05 2021-05-07 2021-12-05 ordenamiento territorial, en el Governance for Deforestation Selection cumplimiento de los PIGCCT y Control como enlace de NORECCO en jurisdicción de CORPORINOQUIA, CO-MADR-199069-CS-INDV / Prestar sus servicios como el Profesional en análisis socio- Integrated Land- Use cultural del paisaje Individual Planning and Improved agropecuario, para desarrollar TF / A6376 Post Consultant Direct 10,197.00 8,508.83 Signed 2020-10-09 2020-10-16 2020-10-17 2020-10-13 2020-10-20 2020-10-19 2020-11-08 2020-11-11 2021-04-07 Governance for Deforestation el componente socio-cultural Selection Control de la formulación de las Cartas del paisaje agropecuario. CO-MADR-197659-CS-INDV / Consultor Temático forestal quien prestara sus servicios profesionales en el análisis de Definition of Emission Individual bases de datos de actividad Reduction Program and TF / A6377 Post Consultant Open 25,462.00 0.00 Canceled 2020-10-09 2020-10-16 2020-11-12 2020-11-12 2020-12-01 2021-12-01 alfanuméricos y geográficos Monitoring, Reporting and Selection requeridos para la estimación Verification y el reporte de emisiones y remociones de GEI del sector AFOLU CO-MADR-201159-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la UIP y a la Project Coordination, Individual Dirección de Innovación, TF / A6376 Management, Monitoring and Post Consultant Direct 34,781.00 30,823.64 Signed 2020-10-22 2020-11-03 2020-11-01 2020-10-22 2020-11-22 2020-11-25 2020-12-27 2020-11-25 2021-06-25 Desarrollo Tecnológico y Evaluation Selection Protección Sanitaria del MADR como Asesor (a) de Comunicaciones y Participacion Page 9 CO-MADR-200275-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, como ingeniero de Definition of Emission sistemas generando los Individual Reduction Program and desarrollos tecnológicos TF / A6376 Post Consultant Direct 30,121.00 27,234.24 Signed 2020-11-03 2020-11-03 2020-11-09 2020-11-04 2020-11-12 2020-11-04 2020-12-01 2020-12-01 2021-12-01 Monitoring, Reporting and necesarios para la captura, Selection Verification almacenamiento, procesamiento, análisis y divulgación de la información del IFN CO-MADR-200277-CS-INDV / Profesional de Calidad Operación estadística Inventario Forestal Nacional, para la implementación de las Definition of Emission Individual operaciones estadísticas de Reduction Program and TF / A6376 Post Consultant Direct 30,121.00 26,402.88 Signed 2020-11-03 2020-11-03 2020-11-09 2020-11-03 2020-11-12 2020-11-03 2020-12-01 2020-12-01 2021-12-01 USO DE LOS RECURSOS Monitoring, Reporting and Selection FORESTALES- URFN, y de Verification INVENTARIO FORESTAL NACIONAL-IFN, y de los procesos para la interoperabilidad CO-MADR-179000-CS-INDV Integrated Land- Use Individual / Profesional en análisis socio- Planning and Improved TF / A6377 Post Consultant Open 10,833.00 0.00 Canceled 2020-06-10 2020-08-20 2020-07-04 2020-07-09 2020-08-06 2021-01-03 cultural del paisaje Governance for Deforestation Selection agropecuario Control CO-MADR-99660-CS-INDV / Líder técnico de apoyo para la Project Coordination, Individual estimación y el reporte de TF / A6377 Management, Monitoring and Post Consultant Open 78,000.00 0.00 Canceled 2019-04-25 2019-05-14 2019-05-21 2019-06-02 2019-11-29 emisiones y remociones de GEI Evaluation Selection para el sector AFOLU CO-MADR-200276-CS-INDV / Prestar sus servicios profesionales como consultor experto coordinando la Definition of Emission Individual caracterización de las causas y Reduction Program and TF / A6376 Post Consultant Direct 37,021.00 33,143.39 Signed 2020-11-19 2020-11-20 2020-11-25 2020-11-03 2020-11-28 2020-12-17 2020-12-17 2020-12-17 2021-12-17 agentes de la transformación Monitoring, Reporting and Selection del bosque y sus emisiones Verification asociadas, los procesos de modelación y el monitoreo comunitario participativo CO-MADR-201844-CS-INDV / Prestar sus servicios profesionales apoyando a la Subdirección de Estudios Definition of Emission Ambientales del Instituto de Individual Reduction Program and Hidrología, Meteorología y TF / A6376 Post Consultant Direct 25,462.00 23,102.52 Signed 2020-11-19 2020-11-20 2020-11-29 2020-11-20 2020-12-20 2020-11-20 2021-01-24 2020-12-16 2021-07-23 Monitoring, Reporting and Estudios Ambientales IDEAM, Selection Verification en el proceso de incorporación y generación de propuesta metodológica y seguimiento de acciones CO-MADR-178998-CS-INDV Integrated Land- Use Individual / Profesional en análisis socio- Planning and Improved TF / A6377 Post Consultant Open 10,833.00 0.00 Canceled 2020-06-10 2020-08-20 2020-07-04 2020-07-09 2020-08-06 2021-01-03 cultural del paisaje Governance for Deforestation Selection agropecuario Control CO-MADR-205823-CS-CDS / Prestar sus servicios como el Profesional en análisis Integrated Land- Use sociocultural del paisaje Individual Planning and Improved agropecuario, para desarrollar TF / A6376 Post Consultant Direct 10,833.00 8,938.48 Signed 2020-11-27 2020-11-23 2020-12-07 2020-11-23 2020-12-28 2020-11-23 2021-02-01 2021-01-15 2021-07-31 Governance for Deforestation el componente sociocultural Selection Control de la formulación de las Cartas del paisaje agropecuario CO-MADR-208056-CS-INDV / Prestar sus servicios profesionales apoyando a la Subdirección de Estudios Definition of Emission Ambientales del Instituto de Individual Reduction Program and Hidrología, Meteorología y TF / A6376 Post Consultant Limited 25,462.00 23,599.80 Signed 2020-12-10 2020-12-07 2020-12-15 2020-12-15 2021-01-05 2021-01-21 2021-02-09 2021-02-19 2021-08-08 Monitoring, Reporting and Estudios Ambientales IDEAM, Selection Verification en el análisis de bases de datos de actividad alfanuméricos y geográficos requeridos para la est CO-MADR-209804-CS-INDV / Prestar sus servicios como el Profesional en Ordenamiento territorial y prospectiva del Integrated Land- Use paisaje agropecuario, para Individual Planning and Improved apoyar la coordinación de la TF / A6377 Post Consultant Direct 26,107.00 24,198.22 Signed 2020-12-22 2020-12-16 2021-01-01 2020-12-16 2021-01-22 2020-12-17 2021-02-26 2021-01-15 2022-02-26 Governance for Deforestation formulación de la Carta del Selection Control paisaje agropecuario, brindado el enfoque de ordenamiento territorial en todo el pr CO-MADR-197660-CS-INDV / Prestar servicios Definition of Emission Individual profesionales para el el Reduction Program and TF / A6377 Post Consultant Open 164,000.00 0.00 Canceled 2020-10-12 2020-11-20 2020-11-11 2020-11-11 2020-11-30 2021-11-30 control de calidad de datos de Monitoring, Reporting and Selection campo del inventario forestal Verification de la Orinoquia (x5) CO-MADR-211405-CS-INDV / Apoyar al especialista de adquisiciones en la realización de los procesos de adquisiciones y contrataciones Project Coordination, Individual que se requieran, de acuerdo TF / A6376 Management, Monitoring and Post Consultant Direct 23,576.00 21,110.86 Signed 2021-02-08 2021-02-05 2021-02-18 2021-02-05 2021-03-11 2021-02-09 2021-04-15 2021-02-15 2021-10-12 con lo establecido en el Evaluation Selection Acuerdo Legal, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las Regulaciones CO-MADR-215613-CS-INDV / Apoyar al especialista financiero del Proyecto BIOCARBONO en la gestión Project Coordination, Individual financiera del proyecto, de TF / A6376 Management, Monitoring and Post Consultant Direct 23,576.00 21,110.86 Signed 2021-02-08 2021-02-05 2021-02-18 2021-02-05 2021-03-11 2021-02-05 2021-04-15 2021-02-15 2021-10-12 acuerdo con lo establecido en Evaluation Selection el Acuerdo Legal, el Manual Operativo del Proyecto y el Plan de Adquisiciones Page 10 CO-MADR-217660-CS-INDV / Prestar sus servicios personales apoyando a la Unidad de Implementación del Proyecto (UIP) en la Definition of Emission Individual implementación de los Reduction Program and Under TF / A6376 Post Consultant Limited 2,000.00 1,665.34 2021-02-15 2021-02-03 2021-02-20 2021-03-01 2021-03-13 2021-03-08 2021-04-17 2021-10-14 procesos de gestión de Monitoring, Reporting and Implementation Selection conocimiento a partir de la Verification información sobre las prácticas bajas en carbono para las cadenas priorizadas y las p CO-MADR-217665-CS-INDV / Apoyar a la Subdirección de Ecosistemas e Información Ambiental del Instituto de Definition of Emission Hidrología, Meteorología y Individual Reduction Program and Under Estudios Ambientales IDEAM, TF / A6376 Post Consultant Open 50,832.00 0.00 2021-02-22 2021-02-16 2021-04-12 2021-05-03 2021-06-07 2021-12-04 Monitoring, Reporting and Implementation en la verificación de las Selection Verification actividades que adelanten las brigadas en campo para el levantamiento de los conglomerados, d CO-MADR-217669-CS-INDV / Realizar el análisis de información a través de SIG para el soporte al marco Definition of Emission Individual geoestadístico como apoyo a Reduction Program and Under TF / A6376 Post Consultant Limited 54,000.00 0.00 2021-02-22 2021-02-16 2021-02-27 2021-03-20 2021-04-24 2021-10-21 la operación en campo y la Monitoring, Reporting and Implementation Selection generación de cartografía Verification relacionada con la implementación del IFN en la región de la Orinoquia CO-MADR-217672-CS-INDV / Apoyar los procesos de capacitación en los procedimientos metodológicos Definition of Emission del IFN, el análisis de la Individual Reduction Program and Under información, el seguimiento a TF / A6376 Post Consultant Open 24,161.00 0.00 2021-02-22 2021-02-16 2021-04-12 2021-05-03 2021-06-07 2021-12-04 Monitoring, Reporting and Implementation las actividades de campo y al Selection Verification aseguramiento, control de calidad y crítica de los procesos de supervisión propios del IFN CO-MADR-217673-CS-INDV / Consultor desarrollador para Definition of Emission consolidar la nueva plataforma Individual Reduction Program and Under informática que permite la TF / A6376 Post Consultant Open 18,826.00 0.00 2021-02-22 2021-03-15 2021-04-12 2021-05-03 2021-06-07 2021-12-04 Monitoring, Reporting and Implementation captura y administración de Selection Verification datos del Inventario Forestal Nacional - IFN CO-MADR-218247-CS-INDV / Fortalecer las capacidades de la Dirección de Cambio Definition of Emission Climático y Gestión del Riesgo Individual Reduction Program and (DCCGR) del MADS para la TF / A6376 Post Consultant Limited 36,000.00 0.00 Canceled 2021-03-12 2021-03-17 2021-04-07 2021-05-12 2021-11-08 Monitoring, Reporting and formulación, cuantificación, Selection Verification reporte y registro de iniciativas de mitigación de GEI CO-MADR-218248-CS-INDV / Realizar el diseño, validación Definition of Emission metodológica e Individual Reduction Program and Under implementación del sistema TF / A6376 Post Consultant Limited 35,000.00 0.00 2021-02-15 2021-04-05 2021-02-20 2021-03-13 2021-04-17 2021-10-14 Monitoring, Reporting and Implementation de monitoreo, reporte y Selection Verification verificación del sector AFOLU e n la Orinoquia CO-MADR-218249-CS-INDV Definition of Emission Individual / Realizar la identificación de Reduction Program and Under TF / A6376 Post Consultant Limited 35,000.00 15,957.00 2021-02-15 2021-04-05 2021-02-20 2021-04-22 2021-03-13 2021-06-17 2021-04-17 2021-10-14 Beneficios No carbono del Monitoring, Reporting and Implementation Selection ERPD Verification CO-MADR-218255-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Subdirección de Estudios Individual Reduction Program and Ambientales del Instituto de TF / A6376 Post Consultant Limited 30,191.00 0.00 Canceled 2021-02-19 2021-02-24 2021-03-17 2021-04-21 2021-10-18 Monitoring, Reporting and Hidrología, Meteorología y Selection Verification Estudios Ambientales IDEAM, en el diseño y validación metodológica del sistema de monitoreo, reporte CO-MADR-199085-CS-INDV / Diseñar la estrategia de interoperabilidad para Integrated Land- Use recopilar y procesar Individual Planning and Improved información espacial y TF / A6376 Post Consultant Open 33,886.00 0.00 Canceled 2021-02-22 2021-03-25 2021-03-27 2021-04-15 2022-04-15 Governance for Deforestation geográfica del área de Selection Control intervención del Proyecto Biocarbono y entidades beneficiarias CO-MADR-218260-CS-INDV / Apoyar la recopilación y Integrated Land- Use Individual procesamiento de información Planning and Improved TF / A6376 Post Consultant Open 23,340.00 0.00 Canceled 2021-02-25 2021-04-15 2021-05-06 2021-06-10 2021-12-07 espacial y geográfica del área Governance for Deforestation Selection de intervención del Proyecto Control Biocarbono, y Minagricultura CO-MADR-201950-CS-INDV / Apoyar la formulación, implementación y seguimiento de estrategias asociadas al Individual Sustainable Land- Use fortalecimiento institucional TF / A6376 Post Consultant Open 36,000.00 0.00 Canceled 2021-02-22 2021-03-23 2021-04-02 2021-05-07 2022-05-07 Management de las mesas de ganadería Selection sostenible de la Orinoquia y su desarrollo sostenible bajo en carbono CO-MADR-201953-CS-INDV / Apoyar el fortalecimiento de las mesas de ganadería Individual sostenible departamentales de Sustainable Land- Use Under TF / A6376 Post Consultant Open 94,000.00 0.00 2021-02-22 2021-03-25 2021-03-23 2021-03-29 2021-04-02 2021-06-18 2021-05-07 2022-05-07 la Orinoquia (Meta, Casanare, Management Implementation Selection Arauca y Vichada) y el desarrollo regional sostenible bajo en carbono Page 11 CO-MADR-218459-CS-INDV / Fortalecer la institucionalidad regional del SNIA (Sistemas Territoriales Individual Innovación, mesas Sustainable Land- Use Under TF / A6376 Post Consultant Limited 25,000.00 0.00 2021-03-01 2021-02-24 2021-03-06 2021-03-27 2021-05-01 2021-10-28 departamentales de C&T, Management Implementation Selection innovación, actualización PECTIA, C&T regalías, supervisión apoyos profesionales PDEA) CO-MADR-218460-CS-INDV / Apoyo para la puesta en Individual Sustainable Land- Use Pending marcha y el seguimiento del TF / A6376 Post Consultant Limited 25,000.00 0.00 2021-03-01 2021-03-06 2021-03-27 2021-05-01 2021-10-28 Management Implementation PIGCC sector agropecuario / Selection NDC 2020 por parte del MADR CO-MADR-218461-CS-INDV / Apoyo seguimiento y Individual Sustainable Land- Use supervisión del proyecto TF / A6376 Post Consultant Limited 25,000.00 22,709.45 Signed 2021-03-01 2021-02-24 2021-03-06 2021-03-02 2021-03-27 2021-04-13 2021-05-01 2021-04-21 2021-10-28 Management BIOCARBONO ORINOQUIA por Selection parte de la DIDTPS CO-MADR-222427-CS-INDV Project Coordination, Individual / Prestar servicios Under TF / A6376 Management, Monitoring and Post Consultant Limited 6,903.00 0.00 2021-03-29 2021-05-26 2021-04-03 2021-04-24 2021-05-29 2021-11-25 profesionales como apoyo Implementation Evaluation Selection administrativo regional CO-MADR-223832-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la Dirección de Project Coordination, Individual Innovación, Desarrollo TF / A6376 Management, Monitoring and Post Consultant Limited 21,964.00 0.00 Canceled 2021-03-15 2021-03-17 2021-03-20 2021-04-12 2021-04-10 2021-05-15 2021-11-11 Tecnológico y Protección Evaluation Selection Sanitaria del Ministerio de Agricultura y Desarrollo Rural, como apoyo departamental del Proyecto Biocar CO-MADR-223836-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la Dirección de Individual Sustainable Land- Use Under Innovación, Desarrollo TF / A6376 Post Consultant Limited 20,803.00 0.00 2021-03-15 2021-03-10 2021-03-20 2021-03-12 2021-04-10 2021-05-15 2021-11-11 Management Implementation Tecnológico y Protección Selection Sanitaria del Ministerio de Agricultura y Desarrollo Rural como profesional de apoyo para la formulación CO-MADR-222434-CS-INDV / Realizar el análisis del cambio de uso del suelo en las categorías clave a ser incluidas Definition of Emission Individual en la estimación de línea base, Reduction Program and TF / A6376 Post Consultant Direct 3,187.00 0.00 Canceled 2021-03-15 2021-03-09 2021-03-25 2021-04-15 2021-05-20 2021-11-16 escenario de referencia y los Monitoring, Reporting and Selection reportes del programa de Verification reducción de emisiones considerando usos forestales, agrícolas y otros tipos de CO-MADR-224148-CS-INDV / Realizar el análisis del cambio de uso del suelo en las categorías clave a ser incluidas Definition of Emission Individual en la estimación de línea base, Reduction Program and Under TF / A6376 Post Consultant Direct 13,179.00 0.00 2021-03-15 2021-03-10 2021-03-25 2021-03-12 2021-04-15 2021-05-20 2021-11-16 escenario de referencia y los Monitoring, Reporting and Implementation Selection reportes del programa de Verification reducción de emisiones considerando usos forestales, agrícolas y otros tipos de CO-MADR-228016-CS-INDV / Análisis del cambio de uso del suelo en las categorías clave a ser incluidas en la Definition of Emission estimación de línea base, Individual Reduction Program and Under escenario de referencia y los TF / A6376 Post Consultant Direct 19,906.00 0.00 2021-04-12 2021-04-15 2021-04-22 2021-04-27 2021-06-01 2021-11-28 Monitoring, Reporting and Implementation reportes del programa de Selection Verification reducción de emisiones considerando usos forestales, agrícolas y otros tipos de cobertura v CO-MADR-230636-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa para apoyar a la Unidad Individual Sustainable Land- Use Under Implementadora del Proyecto TF / A6376 Post Consultant Direct 36,000.00 0.00 2021-04-23 2021-04-26 2021-05-03 2021-05-24 2021-06-28 2021-12-25 Management Implementation Biocarbono UIP en la Selection formulación y seguimiento de iniciativas relacionadas con la validación de modelos productivos sostenibles CO-MADR-218262-CS-INDV Integrated Land- Use / Apoyar la recopilación y Individual Planning and Improved procesamiento de información TF / A6376 Post Consultant Open 23,340.00 0.00 Canceled 2021-02-25 2021-04-15 2021-05-06 2021-06-10 2021-12-07 Governance for Deforestation espacial y geográfica del área Selection Control de intervención para la región CO-MADR-218267-CS-INDV Integrated Land- Use Individual / Asesorar la implementación Planning and Improved TF / A6376 Post Consultant Open 31,000.00 0.00 Canceled 2021-03-15 2021-05-03 2021-05-24 2021-06-28 2021-12-25 de estrategia de gobernanza y Governance for Deforestation Selection control de la deforestación Control CO-MADR-218268-CS-INDV Integrated Land- Use / Apoyar la Implementación de Individual Planning and Improved la estrategia de control a la TF / A6376 Post Consultant Open 24,371.00 0.00 Canceled 2021-04-15 2021-06-03 2021-06-24 2021-07-29 2022-01-25 Governance for Deforestation deforestación (uno por foco de Selection Control deforestación) CO-MADR-231537-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa Integrated Land- Use apoyando al Ministerio de Individual Planning and Improved Under Agricultura y Desarrollo Rural TF / A6376 Post Consultant Limited 33,886.00 0.00 2021-04-30 2021-05-04 2021-05-05 2021-06-02 2021-05-26 2021-06-30 2021-12-27 Governance for Deforestation Implementation (Min agricultura) y a la Unidad Selection Control Implementadora del Proyecto Biocarbono en la gestión y procesamiento de la información espa Page 12 CO-MADR-231548-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa Integrated Land- Use apoyando al Ministerio de Individual Planning and Improved Under Agricultura y Desarrollo Rural TF / A6376 Post Consultant Limited 23,340.00 0.00 2021-04-30 2021-05-04 2021-05-05 2021-06-02 2021-05-26 2021-06-30 2021-12-27 Governance for Deforestation Implementation (Minagricultura) y la Unidad Selection Control Implementadora del Proyecto Biocarbono UIP como gestor para el desarrollo la estrategia de fo CO-MADR-230654-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa apoyando al Ministerio de Integrated Land- Use Individual Agricultura y Desarrollo Rural Planning and Improved Under TF / A6376 Post Consultant Limited 42,000.00 0.00 2021-04-26 2021-05-04 2021-05-01 2021-06-02 2021-05-22 2021-06-26 2021-12-23 (Min agricultura) desde Governance for Deforestation Implementation Selection CORPORINOQUIA y o Control CORMACARENA como apoyo técnico para la implementación del Sistema de Información CO-MADR-230658-CS-INDV / Prestar sus servicios como Gestor técnico de gobernanza y control a la deforestación, Integrated Land- Use desde la Dirección de Individual Planning and Improved Under Bosques, Biodiversidad y TF / A6376 Post Consultant Limited 31,000.00 0.00 2021-04-30 2021-05-04 2021-05-05 2021-06-09 2021-05-26 2021-06-30 2021-12-27 Governance for Deforestation Implementation Servicios Ecosistémicos del Selection Control Ministerio de Ambiente y Desarrollo Sostenible, para la formulación, seguimiento y cumplimient CO-MADR-230661-CS-INDV / Apoyar a la Dirección de Bosques, Biodiversidad y Servicios Ecosistémicos del Integrated Land- Use Ministerio de Ambiente y Individual Planning and Improved Under Desarrollo Sostenible, a la TF / A6376 Post Consultant Limited 37,371.00 0.00 2021-04-30 2021-05-04 2021-05-05 2021-05-26 2021-06-30 2021-12-27 Governance for Deforestation Implementation Unidad implementadora del Selection Control Proyecto, y a los respectivos Departamentos en la planeación, programación, ejecución, monitoreo CO-MADR-231771-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa a la Dirección de Innovación, Individual Sustainable Land- Use Desarrollo Tecnológico y TF / A6376 Post Consultant Limited 10,971.00 10,212.48 Signed 2021-04-30 2021-05-05 2021-05-05 2021-05-07 2021-05-26 2021-06-02 2021-06-30 2021-06-08 2021-12-27 Management Protección Sanitaria del Selection Ministerio de Agricultura y Desarrollo Rural como apoyo operativo para el seguimiento del Proyecto B CO-MADR-232603-CS-INDV / Prestar sus servicios profesionales apoyando a la Unidad Implementadora del Definition of Emission Proyecto UIP, para la Individual Reduction Program and Under construcción del Marco de TF / A6376 Post Consultant Open 22,857.00 0.00 2021-05-07 2021-05-04 2021-06-25 2021-07-16 2021-08-20 2022-02-16 Monitoring, Reporting and Implementation Gestión Ambiental y Social del Selection Verification Programa de Reducción de Emisiones para la Orinoquia, de acuerdo con los lineamientos de la Iniciati CO-MADR-232604-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Dirección de Cambio Climático Individual Reduction Program and y Gestión del Riesgo del TF / A6376 Post Consultant Open 22,286.00 0.00 Canceled 2021-05-07 2021-05-31 2021-06-25 2021-07-16 2021-08-20 2022-02-16 Monitoring, Reporting and Ministerio de Ambiente y Selection Verification Desarrollo Sostenible (MADS), en el seguimiento de las acciones y políticas de reducción a la deforest CO-MADR-232605-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa para apoyar al MADR – Dirección de Individual Sustainable Land- Use Under Innovación, Desarrollo TF / A6376 Post Consultant Limited 24,286.00 0.00 2021-05-07 2021-06-10 2021-05-12 2021-06-02 2021-07-07 2022-01-03 Management Implementation Tecnológico y Protección Selection Sanitaria en el desarrollo de agroecosistemas ganaderos sostenibles bajos en carbono en la Orinoq CO-MADR-234657-CS-INDV / Prestar sus servicios profesionales como Gestor Integrated Land- Use Individual Senior para el seguimiento y Planning and Improved TF / A6376 Post Consultant Direct 24,000.00 22,991.64 Signed 2021-05-19 2021-05-22 2021-05-22 2021-05-26 2021-05-25 2021-05-26 2021-06-04 2021-06-01 2021-12-31 monitoreo del proyecto Governance for Deforestation Selection Desarrollo Sostenible Bajo en Control Carbono en la Región de la Orinoquia CO-MADR-235332-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa Integrated Land- Use apoyando al Ministerio de Individual Planning and Improved Under Agricultura y Desarrollo Rural TF / A6376 Post Consultant Limited 10,293.00 0.00 2021-05-24 2021-05-28 2021-05-29 2021-06-19 2021-07-24 2022-01-20 Governance for Deforestation Implementation (Min agricultura) y Selection Control específicamente a la Unidad de Planificación Rural Agropecuaria (UPRA) y a la Unidad Implementadora del CO-MADR-234498-CS-INDV / Prestar sus servicios como el Profesional en Ordenamiento territorial y prospectiva del Integrated Land- Use paisaje agropecuario, para Individual Planning and Improved apoyar la coordinación de la TF / A6376 Post Consultant Direct 13,535.00 12,568.61 Signed 2021-05-21 2021-05-22 2021-05-31 2021-05-12 2021-06-21 2021-06-03 2021-07-26 2021-06-21 2022-01-22 Governance for Deforestation formulación de la Carta del Selection Control paisaje agropecuario, brindado el enfoque de ordenamiento territorial en todo el pr Page 13 CO-MADR-237680-CS-INDV Definition of Emission Individual / Profesional análisis Reduction Program and TF / A6376 Post Consultant Limited 12,641.00 0.00 Under Review 2021-06-04 2021-06-22 2021-06-09 2021-06-30 2021-08-04 2022-01-31 distribución de la propiedad Monitoring, Reporting and Selection en la Orinoquia Verification CO-MADR-237682-CS-INDV Definition of Emission / Prestar servicios como Individual Reduction Program and Profesional para el diagnóstico TF / A6376 Post Consultant Limited 12,641.00 0.00 Under Review 2021-06-04 2021-06-22 2021-06-09 2021-06-30 2021-08-04 2022-01-31 Monitoring, Reporting and de la tenencia de la tierra en la Selection Verification Orinoquía CO-MADR-237683-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la Dirección de Project Coordination, Individual Under Innovación, Desarrollo TF / A6376 Management, Monitoring and Post Consultant Limited 20,000.00 0.00 2021-06-04 2021-06-11 2021-06-09 2021-06-30 2021-08-04 2022-01-31 Implementation Tecnológico y Protección Evaluation Selection Sanitaria del Ministerio de Agricultura y Desarrollo Rural, como apoyo departamental del Proyecto Biocar CO-MADR-240007-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Dirección de Cambio Climático Individual Reduction Program and Under y Gestión del Riesgo del TF / A6376 Post Consultant Limited 24,474.00 0.00 2021-06-18 2021-06-16 2021-06-23 2021-07-14 2021-08-18 2022-08-18 Monitoring, Reporting and Implementation Ministerio de Ambiente y Selection Verification Desarrollo Sostenible (MADS), en el seguimiento de las acciones y políticas de reducción a la deforest Integrated Land- Use CO-MADR-240822-CS-INDV Individual Planning and Improved Pending / Coordinador infraestructura TF / A6376 Post Consultant Limited 39,663.00 0.00 2021-06-28 2021-07-03 2021-07-24 2021-08-28 2022-08-28 Governance for Deforestation Implementation de datos MADR-UPRA Selection Control Definition of Emission Individual CO-MADR-240877-CS-INDV Reduction Program and Under TF / A6376 Post Consultant Direct 13,714.00 0.00 2021-06-22 2021-06-23 2021-07-02 2021-07-23 2021-08-27 2022-02-23 / Consultor mapas biomasa Monitoring, Reporting and Implementation Selection Verification CO-MADR-218462-CS-INDV / Apoyo encadenamientos Individual Sustainable Land- Use productivos y circuitos cortos TF / A6376 Post Consultant Limited 25,000.00 0.00 Canceled 2021-03-01 2021-03-06 2021-03-27 2021-05-01 2021-10-28 Management bajos en carbono & negocios Selection verdes CO-MADR-218276-CS-INDV / Evaluar y consolidar Individual Sustainable Land- Use propuesta de turismo TF / A6376 Post Consultant Open 55,000.00 0.00 Canceled 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2022-02-09 Management sostenible asociado al sector Selection AFOLU CO-MADR-218241-CS-INDV / Prestar sus servicios profesionales como intérprete Definition of Emission Individual junior 1 para análisis de Reduction Program and TF / A6376 Post Consultant Limited 11,000.00 0.00 Canceled 2021-02-15 2021-02-20 2021-03-13 2021-04-17 2021-10-14 cambio de uso del suelo en el Monitoring, Reporting and Selection cubo de datos del Sistema de Verification Monitoreo de Bosques y Carbono (SMByC) del IDEAM CO-MADR-218242-CS-INDV / Consultor individual par el análisis de incertidumbre de Definition of Emission Individual datos de actividad en el grupo Reduction Program and TF / A6376 Post Consultant Limited 25,000.00 0.00 Canceled 2021-02-26 2021-03-03 2021-03-24 2021-04-28 2021-10-25 de Procesamiento Digital de Monitoring, Reporting and Selection Imágenes del Sistema de Verification Monitoreo de Bosques y Carbono (SMByC) del IDEAM CO-MADR-218243-CS-INDV / Consultor desarrollador para análisis de cambio de uso del Definition of Emission Individual suelo en el grupo de Reduction Program and TF / A6376 Post Consultant Limited 28,000.00 0.00 Canceled 2021-02-26 2021-03-03 2021-03-24 2021-04-28 2021-10-25 Procesamiento Digital de Monitoring, Reporting and Selection Imágenes del Sistema de Verification Monitoreo de Bosques y Carbono (SMByC) del IDEAM Page 14 SUMMARY O F PROCUREMENT PLAN Project Preparation Advancement (PPA) Project information: Harmonizing and Improving Statistics in West Africa Project -P169265 Project Implementation agency: Liberia Institute of Statistics and Geo- Information Services (LISGIS) Date of the Procurement Plan: February 3, 2020 Period covered by this Procurement Plan: 3rd February to 31st July 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 1, 2016), revised in November 2017, and August 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the Regional Project for Statistics Thresholds*, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] All contracts at or above USD Open Competition 5,000,000 are subject to International Market 1 Works C ≥ 5,000,000 Approach and Direct international advertising and the use of the Bank’s SPDs (or other Contracting documents agreed with the Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Bank). Open Competition National Market 200,000 < C < 5,000,000 None Approach C ≤ 200,000 RfQ None All contracts at or above USD Open Competition 500,000 are subject to International Market international advertising and the C ≥ 500,000 Approach and Direct use of the Bank’s SPDs (or other Goods, IT and Contracting documents agreed with the 2 non-consulting Bank). services Open Competition 100,000 < C < 500,000 National Market None Approach C ≤ 100,000 RfQ None All contracts at or above USD 100,000 are subject to for international advertising and the C < 100,000 Consulting Services use of the Bank’s SPDs (or other National documents agreed with the shortlist for Bank). 3 selection of All contracts at or above USD consultant firms for 200,000 are subject to Engineering and international advertising and the C ≤ 200,000 Construction use of the Bank’s SPDs (or other Supervision documents agreed with the Bank). Selection of All values ≥ 100,000 4 Individual All Approaches consultants Training, This line activity is not subject to Workshops, Based on approved Procurement Review However, 5 Study Tours All Values Annual Work Plan & each of the activities will be Budgets (AWPB) by TTL cleared with the TTL prior to its implementation. (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will be need for prequalification in the procurement arrangements under this Regional Project *These thresholds are for the purposes of the initial procurement plan for the PPA and for first 18 months. The thresholds will be revised periodically based on re- assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The LISGIS Project Management Team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Works There are no works under the Project Preparation Advance Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procurement Prequ Nation Revie Expecte Expecte Comment No. (Description) Cost Method alifica al w d bid d s US$ tion Prefer by opening Contrac (yes/n ence Bank date t o) (yes/n (Prior Signatu o) / Post) re Date 1 Procurement of 4 12,100 laptops, 3 No. all- in-1 printers, Limited, RFQ No No Post 28 Feb 4 Mar office desks, a 20 20 projector, metal filing cabinet, and stationery and supplies for project management Consultancy Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimate Selection Review Expecte Expected Expected Comments No. Assignment d Method/ by Bank d date Contract Completi Cost in Arrangem (Prior / of Signatur on US$ ent Post) proposal e Date submissi Date on 1. Recruitment of a Consultant to draft and validate 10,000 INDV Post 16 Mar 10 Apr 23 Apr ToR to be curricula of the 20 20 20 submitted to IDA Statistics degree & for Review and No CEST Program at Objection. the UL 2. Recruitment of a ToR, performance Financial evaluation, draft Management contract and Officer for Project DS Prior 10 Feb 21 Feb 31 Aug minutes of Management 20 20 20 contract negotiation to be submitted to IDA for Review and No 15,600 Objection. 3. ToR, performance evaluation, draft Recruitment of a contract and Procurement DS Prior 10 Feb 21 Feb 31 Aug minutes of Specialist for 20 20 20 contract Project 18,000 negotiation to be Management submitted to IDA for Review and No Objection. Training and Workshop (Training & Workshop activities are subject to TTL clearance). Estimat Estimated Expected Ref. Training, workshop and ed Cost Duration Training/workshop No. study tours in (Days) Date (US$) Conduct of validation 54,000 workshop and TOT for the GP Feb. 20 to March 1. on the design of 13 2020 questionnaires and enumeration training manual Workshop for cartographic 150,000 Feb. 24 to March 2. field staff training 16 2020 Workshop for enumeration 113,900 3. mapping training April 15, 2020 Study Tours to regional 32,000 countries for first-hand experience on regional March to April 4. harmonization of data 2020 collection, management and communication Workshops on current 50,000 administrative data across 5. April to July 2020 MACs and LISGIS regional offices Workshop to strengthen and 35,000 6. develop institutional capacity April to July 2020 of NSO Workshops for steering 40,000 7. committee on Administrative April to July 2020 Data Workshop for Project 10,000 Steering/Technical 8. Committees for annual work February 2020 plan preparation, review and validation GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) communication technology (including, without limitation, internet and telephone; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance; (iv) maintenance of equipment; (v) photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Western Africa : Harmonizing and Improving Statistics in West Africa PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2020-03-22 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169265 GPN Date: 2021-05-19 Project Name: Harmonizing and Improving Statistics in West Africa Loan / Credit No: IDA / 65730, IDA / 65760 H Executing Agency(ies): armonizing and Improving Statistics in West Africa - Ghana WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/TPFB/05 Collection, Quality Request for Single Stage - One /20 / Supply of Field bags for IDA / 65730 Post Open - National 0.00 Canceled 2020-02-14 2020-03-15 2020-04-14 Improvement, Dissemination Quotations Envelope trial census PES - 70 pcs and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/TPRC/0 Collection, Quality Request for Single Stage - One 4/20 / Supply of Rain coats IDA / 65730 Post Open - National 0.00 Canceled 2020-02-16 2020-03-22 2020-05-21 Improvement, Dissemination Quotations Envelope for trial census PES - 70 and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PPA/TPRJ/07 Harmonization, Data /20 / Supply of Reflective Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2020-02-14 2020-03-04 2020-04-03 Jackets for trial census PES - Improvement, Dissemination Quotations Envelope 70 pcs and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/TPBC/08 Collection, Quality Request for Single Stage - One /20 / Supply of Branded Caps IDA / 65730 Post Open - National 0.00 Canceled 2020-02-16 2020-03-29 2020-06-27 Improvement, Dissemination Quotations Envelope for trial census PES - 70 pcs and Use of Core Social and Economic Statistics GP/GSS/HISWAP/PPA/TPTM/0 Regional component: 9/20 / Training Materials for Harmonization, Data Trial Census PES (Manuals - Collection, Quality Request for Single Stage - One 70, Flip Charts -5, Markers- IDA / 65730 Post Open - National 0.00 Canceled 2020-02-14 2020-03-09 2020-03-18 Improvement, Dissemination Quotations Envelope 5, Chalks-5pkt, Pens - and Use of Core Social and 5pkt,Notepads-70, Folders- Economic Statistics 70, ID Accessories -70, etc) Regional component: GP/GSS/HISWAP/PPA/MCBC/1 Harmonization, Data 0/20 / Supply of Branded Collection, Quality Single Stage - One Caps for Training field IDA / 65730 Post Request for Bids Open - National 66,898.35 Completed 2020-01-30 2020-01-17 2020-02-04 2020-03-05 2020-02-07 2020-03-26 2020-03-10 2020-04-30 2020-05-07 2020-08-28 2020-10-02 Improvement, Dissemination Envelope Practice and field work - and Use of Core Social and 70,000 pcs Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCNP/1 Harmonization, Data 1/20 / Supply of Notepad for Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 48,611.11 Completed 2020-02-04 2020-03-24 2020-05-07 2020-06-22 2020-09-23 Training of Census Improvement, Dissemination Quotations Envelope Enumerators - 70,000 and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCRC/1 Harmonization, Data 4/20 / Procurement of Collection, Quality Single Stage - One Raincoats for Training Field IDA / 65730 Post Request for Bids Open - National 315,030.42 Completed 2020-01-31 2020-01-16 2020-02-05 2020-03-06 2020-02-11 2020-03-27 2020-05-18 2020-05-01 2020-07-20 2020-07-30 2021-01-22 Improvement, Dissemination Envelope Practice and field work - and Use of Core Social and 70,000 Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCTB/1 Harmonization, Data 5/20 / Procurement of Collection, Quality Tablets for Census training, IDA / 65730 Prior Direct Selection Direct 0.00 Canceled 2020-01-30 2020-02-04 2020-03-03 2020-07-01 Improvement, Dissemination field practice and field work - and Use of Core Social and 20,000 pcs Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCRJ/1 Harmonization, Data 6/20 / Supply of Reflective Collection, Quality Single Stage - One Jackets for Census Training IDA / 65730 Post Request for Bids Open - National 164,205.04 Completed 2020-01-31 2020-02-17 2020-02-05 2020-03-06 2020-02-07 2020-03-27 2020-03-10 2020-05-01 2020-05-12 2020-08-29 2020-10-02 Improvement, Dissemination Envelope Field Practice and Field work - and Use of Core Social and 70,000 Economic Statistics GP/GSS/HISWAP/PPA/STN/17/ Project Management and Request for Single Stage - One 20 / Stationery for IDA / 65730 Post Open - National 0.00 Canceled 2020-04-04 2020-05-30 2020-06-29 Monitoring and Evaluation Quotations Envelope preparatory meetings Regional component: Harmonization, Data GP/HISWAP/GSS/MC/TAB/001 Collection, Quality /20 / Procurement of 35,000 IDA / 65730 Prior Direct Selection Direct 5,600,000.00 Signed 2020-02-07 2020-08-31 2020-02-10 2020-09-07 2020-03-05 2020-09-09 2020-04-24 Improvement, Dissemination Tablets and Power Banks and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/MC/TAB/002 Harmonization, Data /20 / Procurement of 35,000 Collection, Quality IDA / 65730 Prior Direct Selection Direct 3,159,800.00 Completed 2020-02-07 2020-08-31 2020-02-11 2020-09-09 2020-03-08 2020-09-11 2020-04-27 2020-10-13 Tablets and Power Banks Improvement, Dissemination under direct contracting and Use of Core Social and Economic Statistics Page 1 GP/HISWAP/GSS/DM/LP/003/ Country-Specific Component: 20 / Procurement of 800 Improving and modernizing Single Stage - One Laptops for training and IDA / 65730 Post Request for Bids Open - National 723,801.33 Completed 2020-02-07 2020-01-20 2020-02-12 2020-03-13 2020-02-10 2020-04-03 2020-03-17 2020-05-08 2020-06-15 2020-08-06 2020-12-22 physical and statistical Envelope Census Data Monitoring (High infrastructure End Xtra ) Regional component: GP/HISWAP/GSS/MC/FB/004/ Harmonization, Data 20 / Procurement of Fieldbags Collection, Quality Single Stage - One IDA / 65730 Post Request for Bids Open - National 273,391.54 Completed 2020-02-20 2020-03-04 2020-02-25 2020-03-26 2020-03-27 2020-04-16 2020-05-14 2020-05-14 2020-07-17 2020-08-12 2021-01-21 for Main Census field work - Improvement, Dissemination Envelope 62,000 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/PES/FB/034/ Harmonization, Data 20 / Procurement of Fieldbags Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2020-10-17 2020-11-28 2021-02-26 for PES CAPI and Manual - Improvement, Dissemination Quotations Envelope 300 and Use of Core Social and Economic Statistics Regional component: GH/GSS/HISWAP/GP/UN/TB/0 Harmonization, Data 1/20 / Procurement of Collection, Quality UN Agencies Tablets for Census training, IDA / 65760 Prior Direct 3,295,091.18 Completed 2020-09-21 2020-10-01 2020-09-26 2020-10-27 2020-10-29 2020-11-06 2021-02-26 2021-03-31 Improvement, Dissemination (Direct) field practice and field work - and Use of Core Social and 20,000 pcs Economic Statistics Country-Specific Component: GP/GSDP2/GSS/VEH/015/20 Improving and modernizing Single Stage - One / Procurement of Vehicles (For IDA / 65730 Prior Request for Bids Open - National 1,321,334.03 Signed 2020-11-30 2020-11-26 2020-12-05 2020-12-09 2021-01-04 2021-01-22 2021-01-25 2021-02-09 2021-03-01 2021-03-26 2021-05-30 physical and statistical Envelope GLSS -25, Pick ups - 6) infrastructure Regional component: CS/PHC/HISWAP/PHC/CC/004 Harmonization, Data /20 / Design, Supply and Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Canceled 2020-11-15 2020-12-14 2021-02-12 Installation of Call Center Improvement, Dissemination Quotations Envelope equipment and Use of Core Social and Economic Statistics GD/PHC/HISWAP/WLC/001/2 Regional component: 0 / Supply of Wireless LAN Harmonization, Data Controller and other Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 17,709.00 Completed 2020-10-21 2020-11-25 2020-10-16 2020-12-16 2020-12-18 equipment for the Improvement, Dissemination Quotations Envelope provisioning of 2020PHC and Use of Core Social and Tablets Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCID/0 Harmonization, Data 6/20 / Procurement of 70,000 Collection, Quality Single Stage - One ID Cards for Census IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2020-02-28 2020-03-04 2020-04-03 2020-04-17 2020-05-22 2020-08-20 Improvement, Dissemination Envelope Enumerators Training and and Use of Core Social and field work Economic Statistics Regional component: GP/HISWAP/MOTCA/TQ/031/ Harmonization, Data Pending 20 / Printing of Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2022-02-05 2022-05-22 2022-08-20 Questionnaires for Tourism Improvement, Dissemination Quotations Envelope on Arrival Receipt - 2,000 and Use of Core Social and Economic Statistics Regional component: GD/GSS/HISWAP/CP/WS/072/ Harmonization, Data 20 / Supply of additional Collection, Quality IDA / 65760 Prior Direct Selection Direct 0.00 Canceled 2021-05-31 2021-06-05 2021-07-10 2022-01-06 Digital Weighing Scales, and Improvement, Dissemination Spare Parts and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/CPI/WS/024/ Harmonization, Data 20 / Procurement of Digital Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 33,994.74 Completed 2021-09-05 2021-11-07 2021-04-08 2022-02-05 2021-05-27 Weighing Scale and Improvement, Dissemination Quotations Envelope Accessories for CPI and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/PPI/FL/022/2 Harmonization, Data 0 / Supply Logistics for Collection, Quality Request for Single Stage - One Fieldwork for Rebasing of PPI IDA / 65730 Post Open - National 0.00 Canceled 2021-10-05 2021-12-07 2021-12-13 Improvement, Dissemination Quotations Envelope (e.g. satchels, pencils, and Use of Core Social and clipboards, etc.) Economic Statistics Regional component: GP/HISWAP/GSS/NA/AOC/011 Harmonization, Data Pending /20 / Procurement of One-in- Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-09-05 2021-10-31 2021-12-30 all desktop computers for Improvement, Dissemination Quotations Envelope on National Accounts - 10 pcs and Use of Core Social and Economic Statistics GP/HISWAP/GSS/RE/019/20 / Country-Specific Component: Pending Recording Equipment (Digital Improving and modernizing Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2022-03-05 2022-05-07 2022-07-06 Camera - 2, Video Camera - physical and statistical Quotations Envelope on 2, Voice Recorder - 3) infrastructure GP/HISWAP/GSS/MC/VEH/005 Country-Specific Component: /20 / Procurement of vehicles Improving and modernizing Single Stage - One IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2022-03-31 2022-04-05 2022-05-05 2022-05-26 2022-06-30 2022-09-28 for 2020PHC (Robust 4X4-16, physical and statistical Envelope Saloon-5) infrastructure GP/HISWAP/GSS/GLSS8/DS/03 Country-Specific Component: 8/20 / Procurement of Market Improving and modernizing Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2022-09-05 2022-10-24 2023-01-22 Digital Scales for GLSS8 - 130 physical and statistical Quotations Envelope pcs infrastructure Country-Specific Component: GP/HISWAP/GSS/SWC/021/20 Pending Improving and modernizing Request for Single Stage - One / Supply and Fixing of Swivel IDA / 65730 Post Open - National 0.00 Implementati 2021-12-05 2022-02-06 2022-04-07 physical and statistical Quotations Envelope Chairs - 70 pieces on infrastructure Country-Specific Component: GP/HISWAP/GSS/CT/018/20 Pending Improving and modernizing Request for Single Stage - One / Procurement of Car Tyres IDA / 65730 Post Open - National 0.00 Implementati 2021-10-30 2022-01-01 2022-03-02 physical and statistical Quotations Envelope for HISWAP - 30 pieces on infrastructure Page 2 Country-Specific Component: GP/HISWAP/GSS/DDE/020/20 Improving and modernizing Single Stage - One / Procurement of Document IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2021-11-30 2021-12-05 2022-01-04 2022-01-25 2022-03-01 2022-05-30 physical and statistical Envelope Digitization Equipment infrastructure Country-Specific Component: GP/HISWAP/GSS/GLSS8/FDC/ Improving and modernizing Request for Single Stage - One 04020 / Furnishing of Data IDA / 65730 Post Open - National 0.00 Canceled 2022-03-05 2022-04-16 2022-07-15 physical and statistical Quotations Envelope Processing Centre infrastructure Regional component: GP/GSS/HISWAP/PPA/PB/BC/2 Harmonization, Data 0/20 / Supply of Branded Collection, Quality Request for Single Stage - One Caps for Census Official for IDA / 65730 Post Open - National 0.00 Canceled 2021-01-06 2021-03-03 2021-06-01 Improvement, Dissemination Quotations Envelope publicity and launching - and Use of Core Social and 3,900 pcs Economic Statistics Regional component: Harmonization, Data GP/HISWAP/MOE/BPD/028/20 Pending Collection, Quality Request for Single Stage - One / Procurement of Branded Pen IDA / 65730 Post Open - National 0.00 Implementati 2022-03-05 2022-04-30 2022-05-09 Improvement, Dissemination Quotations Envelope Drives - 300 on and Use of Core Social and Economic Statistics GP/HISWAP/GSS/GLSS8/CT/0 Project Management and Request for Single Stage - One 45/20 / Procurement of Car IDA / 65730 Post Open - National 0.00 Canceled 2022-05-04 2022-07-06 2022-09-04 Monitoring and Evaluation Quotations Envelope Tyre for GLSS8 - 570 pcs Regional component: GP/GSS/HISWAP/PPA/MCF/12 Harmonization, Data /20 / Supply of Folders for Collection, Quality Single Stage - One IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2021-01-11 2021-01-16 2021-02-15 2021-03-08 2021-04-12 2021-07-11 Training of Census Improvement, Dissemination Envelope Enumerators - 70,000 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/IBES/LF/042/ Harmonization, Data 20 / Procurement of Field Collection, Quality Request for Single Stage - One Logistics for IBES Fieldwork IDA / 65730 Post Open - National 0.00 Canceled 2022-04-05 2022-05-31 2022-08-29 Improvement, Dissemination Quotations Envelope (e.g. satchels, pencils, and Use of Core Social and clipboards, etc.) Economic Statistics Regional component: Harmonization, Data GP/HISWAP/GSS/IBES/IR/046/ Collection, Quality Request for Single Stage - One 20 / Printing of IBES Reports IDA / 65730 Post Open - National 0.00 Canceled 2021-12-20 2022-02-07 2022-02-16 Improvement, Dissemination Quotations Envelope (employment, job creation etc) and Use of Core Social and Economic Statistics GP/HISWAP/GSS/GLSS8/L&S/0 Regional component: 36/20 / Procurement of Harmonization, Data Logistics and Stationery for Collection, Quality Request for Single Stage - One GLSS8 fieldwork and mapping IDA / 65730 Post Open - National 0.00 Canceled 2021-10-05 2021-11-23 2022-02-21 Improvement, Dissemination Quotations Envelope activities (Raincoats, and Use of Core Social and fieldbags, solar lamp, field Economic Statistics boots etc) Regional component: Harmonization, Data GP/HISWAP/MOH/HSR/029/2 Pending Collection, Quality Request for Single Stage - One 0 / Printing of Health Survey IDA / 65730 Post Open - National 0.00 Implementati 2022-03-05 2022-04-30 2022-07-29 Improvement, Dissemination Quotations Envelope Report -200 on and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/HISWAP/MOTCA/TRP/032 Collection, Quality Request for Single Stage - One /20 / Printing of Tourism IDA / 65730 Post Open - National 0.00 Canceled 2022-07-05 2022-08-23 2022-11-21 Improvement, Dissemination Quotations Envelope Report - 200 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/IBES/QM/043 Harmonization, Data /20 / Printing of Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2022-03-05 2022-04-30 2022-05-01 Questionnaires and Manuals Improvement, Dissemination Quotations Envelope for IBES - 8,000 for IBES and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/IBES/LE/044/ Harmonization, Data 20 / Procurement of Logistics Collection, Quality Request for Single Stage - One and Equipment for or IBES ( IDA / 65730 Post Open - National 0.00 Canceled 2022-03-05 2022-04-23 2022-07-22 Improvement, Dissemination Quotations Envelope Toners 10, External Drives - and Use of Core Social and 4, A4 Ppapers - 300 bx Economic Statistics Regional component: Harmonization, Data GP/HISWAP/GSS/MC/PR/035/ Pending Collection, Quality Request for Single Stage - One 20 / Printing of Census IDA / 65730 Post Open - National 0.00 Implementati 2022-01-05 2022-02-16 2022-05-17 Improvement, Dissemination Quotations Envelope Reports on and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/BDR/RF/026/20 Harmonization, Data Pending / Printing and delivery of Birth Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2022-04-04 2022-05-23 2022-08-21 and Death Registeration Improvement, Dissemination Quotations Envelope on Forms - 103,000 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/IBES/PF/041/ Harmonization, Data 20 / Printing of Posters - Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2022-06-05 2022-07-31 2022-10-29 5000, and Flyers - 10,000 for Improvement, Dissemination Quotations Envelope IBES and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/BDR/HS/033/20 Harmonization, Data Pending / Printing of Hologram Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2022-07-05 2022-08-23 2022-11-21 Stickers for Birth and Death - Improvement, Dissemination Quotations Envelope on 100,000 and Use of Core Social and Economic Statistics Page 3 GP/HISWAP/GIS/FSU/030/20 Country-Specific Component: / Furnishing of Statistics Units Pending Improving and modernizing Request for Single Stage - One of Ghana Immigration IDA / 65730 Post Open - National 0.00 Implementati 2022-07-05 2022-08-16 2022-11-14 physical and statistical Quotations Envelope statistical offices across the on infrastructure country GP/HISWAP/GSS/GLSS8/IE/03 Regional component: 9/20 / Procurement of IT Harmonization, Data Equipment for or GLSS8 Collection, Quality Request for Single Stage - One (Notebook Computers - 30, IDA / 65730 Post Open - National 0.00 Canceled 2022-07-05 2022-08-23 2022-11-21 Improvement, Dissemination Quotations Envelope Power Banks - 160, CDR-500, and Use of Core Social and External Drives - 30, Flash Economic Statistics Drives - 500) Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/SM/19/ Collection, Quality Request for Single Stage - One 20 / Printing of Supervisors IDA / 65730 Post Open - National 0.00 Canceled 2021-01-23 2021-02-20 2021-03-22 Improvement, Dissemination Quotations Envelope Manuals - 18,400 and Use of Core Social and Economic Statistics Country-Specific Component: GP/HISWAP/GSS/AC/016/20 Pending Improving and modernizing Request for Single Stage - One / Supply and Fixing of 80 Air- IDA / 65730 Post Open - National 0.00 Implementati 2021-09-05 2021-11-07 2022-02-05 physical and statistical Quotations Envelope conditioners on infrastructure GP/GSS/HISWAP/PPA/LP/03/2 Country-Specific Component: 0 / Procurement of 124 Improving and modernizing Laptops for training and use IDA / 65730 Post Request for Bids 0.00 Canceled 2021-03-15 2021-03-20 2021-04-19 2021-05-03 2021-05-31 2021-08-29 physical and statistical by 552 Census Data Monitors infrastructure (High End Xtra ) Regional component: GSS/HISWAP/GP/CTQ/RFQ/00 Harmonization, Data 2/21 / Printing of Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Canceled 2021-06-05 2021-07-10 2021-08-09 questionnaires for 20121PHC Improvement, Dissemination Quotations Envelope main training and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/PM/18/ Collection, Quality Single Stage - One 20 / Printing of Field Officers IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2021-05-31 2021-06-05 2021-07-05 2021-07-26 2021-08-30 2021-10-19 Improvement, Dissemination Envelope Manuals - 80,000 and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GIS/HISWAP/DMS/39/21 Pending Collection, Quality Single Stage - One / Procurement of Digital IDA / 65760 Post Request for Bids Open - National 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2021-10-29 Improvement, Dissemination Envelope Mobile Shelve on and Use of Core Social and Economic Statistics GP/HISWAP/GSS/MDA/VEH/04 Country-Specific Component: Under 0/21 / Procurement of Improving and modernizing Single Stage - One IDA / 65760 Post Request for Bids Open - National 0.00 Implementati 2021-07-30 2021-05-11 2021-08-04 2021-05-12 2021-09-15 2021-10-15 2021-11-19 2022-05-18 vehicles for HISWAP (Pickups- physical and statistical Envelope on 7, Mobile Registration Van-8) infrastructure Regional component: GP/HISWAP/GSS/CPI/LP/016/ Harmonization, Data Pending 21 / Procurement of Laptop Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 computers with high speed Improvement, Dissemination Quotations Envelope on processor - 3 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/MC/FST/007 Harmonization, Data /20 / Printing of Stickers for Collection, Quality Single Stage - One IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2021-05-31 2021-06-05 2021-07-05 2021-07-26 2021-08-30 2021-09-08 Main Census field work - Improvement, Dissemination Envelope 5,000,000 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/MOE/ASCQ/027/ Harmonization, Data 20 / Printing and delivery Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 41,582.13 Signed 2021-04-20 2021-06-22 2021-05-04 2021-12-19 questionnaires for Annual Improvement, Dissemination Quotations Envelope School Census - 53688 and Use of Core Social and Economic Statistics GP/HISWAP/GSS/SOL/012/20 / Procurement of Stationery and office logistics for HISWAP Project Management and Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Canceled 2021-05-04 2021-05-24 2021-06-23 activities ( A4 Sheets, Pens, Monitoring and Evaluation Quotations Envelope Toners, Note pads, Arc Files etc) GP/GSS/HISWAP/PPA/CA/01/ 20 / Computers and Accessories to set up Census Country-Specific Component: offices (Desktop computers- Improving and modernizing Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2021-06-05 2021-07-24 2021-10-22 18, Workstation-4 UPS-18 physical and statistical Quotations Envelope printers-8, Toners-100, infrastructure External Drive-90, Copier Toners - 20, Flash Drives-70) GP/HISWAP/GSS/PHC/LDC/01 Country-Specific Component: Under 8/21 / Procurement of Improving and modernizing Single Stage - One IDA / 65760 Post Request for Bids Open - National 0.00 Implementati 2021-06-30 2021-05-10 2021-07-11 2021-05-12 2021-08-10 2021-09-09 2021-10-14 2021-12-13 Laptops - 312 units for 2021 physical and statistical Envelope on PHC infrastructure Regional component: GP/GSS/HISWAP/PPA/PB/BPS/ Harmonization, Data 20/20 / Supply of Branded Under Collection, Quality Request for Polo Shirts and Polo Caps for IDA / 65730 Post 0.00 Implementati 2021-06-12 2021-07-24 2021-10-22 Improvement, Dissemination Quotations Census Official for publicity on and Use of Core Social and and launching - 5,000 pcs Economic Statistics Regional component: GD/GSS/HISWAP/PHCL/CK/00 Harmonization, Data 1/21 / Procurement of Chalks Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 92,040.66 Signed 2021-05-08 2021-06-10 2021-05-27 2021-06-13 for 2021PHC Listing Activities Improvement, Dissemination Quotations Envelope - 2,600 boxes and Use of Core Social and Economic Statistics Page 4 GP/HISWAP/GSS/ITE/014/20 / Procurement IT Equipment Country-Specific Component: for GSDP (Computers and UPS Pending Improving and modernizing Single Stage - One -203, Laptops -130, Servers - IDA / 65730 Post Request for Bids Open - National 0.00 Implementati 2021-08-20 2021-08-25 2021-09-24 2021-10-15 2021-11-19 2022-03-19 physical and statistical Envelope 21, Printers - 78, Scanners - on infrastructure 50, Photocopiers - 47, EHD - 102, Projectors - 40 ) Regional component: GP/HISWAP/GSS/DP/DKC/013 Harmonization, Data Under /20 / Procurement of High Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-06-05 2021-07-31 2021-09-29 End Laptop Computers for Improvement, Dissemination Quotations Envelope on PHC Data Processing - 10 pcs and Use of Core Social and Economic Statistics GP/GSS/HISWAP/PHC/PTM/00 Regional component: 2/21 / Printing of Training Harmonization, Data materials for 2021PHC Collection, Quality Request for Single Stage - One Regional training IDA / 65760 Post Open - National 81,590.21 Signed 2021-05-07 2021-06-09 2021-05-27 2021-06-23 Improvement, Dissemination Quotations Envelope (Questionnaires - 9,500, and Use of Core Social and Trainers Guide - 8,000, Economic Statistics Manuals - 9,500). Regional component: GP/HISWAP/GSS/CPI/WS/023/ Harmonization, Data Pending 20 / Procurement of CPI work Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-10-05 2021-12-07 2022-03-07 station with video conference Improvement, Dissemination Quotations Envelope on facilities and Use of Core Social and Economic Statistics GP/GSS/HISWAP/PPA/MCMT/1 Regional component: 3/20 / Materials for field work Harmonization, Data and training of Census Under Collection, Quality Request for Single Stage - One Enumerators (Flip Charts - IDA / 65730 Post Open - National 0.00 Implementati 2021-07-05 2021-08-30 2021-11-28 Improvement, Dissemination Quotations Envelope 1,900 pieces, A4 Papers - 562 on and Use of Core Social and boxes, Markers - 10,000 pcs, Economic Statistics Pens - 1,470pkts etc) GP/HISWAP/GSS/PPE/PHC/RT/ 09/21 / Procurement of PPEs Regional component: and Sanitary items for Harmonization, Data 2021PHC Regional Training Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 6,518.00 Signed 2021-06-05 2021-07-10 2021-06-07 2021-07-31 activities (Face mask - 1,280 Improvement, Dissemination Quotations Envelope pkts, sanitizers - 100 gallons, and Use of Core Social and Tissue papers - 2,912packs Economic Statistics etc) Regional component: GP/HISWAP/GSS/MC/PB/010/ Harmonization, Data Under 20 / Printing of Banners for Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2020-02-14 2020-03-18 2020-04-17 2021PHC Publicity and Improvement, Dissemination Quotations Envelope on Education - 2,750 pcs and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PHC/OTG/10 Collection, Quality Request for Single Stage - One /21 / Procurement of OTG IDA / 65760 Post Open - National 7,997.65 Signed 2021-07-05 2021-08-12 2021-05-26 2021-08-26 Improvement, Dissemination Quotations Envelope flash drives - 816 pieces and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/PHC/CCS/01 Harmonization, Data 1/21 / Supply, Design and Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 14,102.39 Signed 2021-06-05 2021-07-17 2021-06-14 2021-08-07 installation of Call Centre Improvement, Dissemination Quotations Envelope Services for 2021HC and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/FM/012 Harmonization, Data /21 / Procurement of Face Under Collection, Quality Request for Single Stage - One Masks for 2021PHC main IDA / 65760 Post Open - National 0.00 Implementati 2021-07-05 2021-09-06 2021-09-20 Improvement, Dissemination Quotations Envelope training of the field officers - on and Use of Core Social and 15,300 packets Economic Statistics GP/HISWAP/GSS/PHC/HSLS/0 Regional component: 13/21 / Procurement of Hand Harmonization, Data Under Sanitizers - 76500 bottles Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-20 2021-08-13 2021-08-27 (200ml) and Liquid soaps - Improvement, Dissemination Quotations Envelope on 65,500 gallons for 2021PHC and Use of Core Social and Main training - Economic Statistics GP/HISWAP/GSS/PHC/TS/014 Regional component: /21 / Procurement of Tissue Harmonization, Data Under Papers for (drying of hands) Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-20 2021-08-13 2021-08-27 for 2021PHC main training of Improvement, Dissemination Quotations Envelope on the field officers - 3,160 and Use of Core Social and packets Economic Statistics Regional component: GP/HISWAP/GSS/PHC/TRL/01 Harmonization, Data 5/21 / Procurement of T - Pending Collection, Quality Request for Single Stage - One Rolls for 2021PHC main IDA / 65760 Post Open - National 0.00 Implementati 2021-08-04 2021-09-27 2021-10-11 Improvement, Dissemination Quotations Envelope training of field officers - on and Use of Core Social and 15,300 packets Economic Statistics Regional component: GP/HISWAP/GSS/MC/S&F/008 Harmonization, Data /20 / Printing of Brochures - Under Collection, Quality Request for Single Stage - One 200,000 copies, Stickers - IDA / 65730 Post Open - National 0.00 Implementati 2021-06-07 2021-08-09 2021-08-23 Improvement, Dissemination Quotations Envelope 100,000 copies for Census on and Use of Core Social and Publicity and Education Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PHC/CBC/00 Under Collection, Quality Request for Single Stage - One 6/21 / Printing and Supply of IDA / 65760 Post Open - National 0.00 Implementati 2021-06-05 2021-07-31 2021-08-14 Improvement, Dissemination Quotations Envelope Call back cards for 2021PHC on and Use of Core Social and Economic Statistics GP/HISWAP/MOE/PR/038/21 Regional component: / Printing of questionnaires Harmonization, Data for Ministry of Education Pending Collection, Quality Request for Single Stage - One Annual School Census (Basic, IDA / 65760 Post Open - National 0.00 Implementati 2021-09-05 2021-10-31 2021-11-30 Improvement, Dissemination Quotations Envelope SHS, Technical, Management) on and Use of Core Social and for 216 Districts - 93,000 Economic Statistics copies Page 5 Regional component: GD/PHC/HISWAP/PID/001/20 Harmonization, Data Under / Printing of ID Cards for Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-06 2021-08-01 2021-08-22 2021PHC Enumerators and Improvement, Dissemination Quotations Envelope on Supervisors and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/MC/PP/009/ Harmonization, Data Under 20 / Printing of Poster for Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-06-06 2021-07-28 2021-08-18 Main Census Publicity and Improvement, Dissemination Quotations Envelope on Education - 100,000 pcs and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/CT/003 Harmonization, Data Under /21 / Procurement of Car Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-25 2021-08-27 2021-09-17 Tyres and batteries foe Improvement, Dissemination Quotations Envelope on Census field work operations and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/CCTV/CC/PH Harmonization, Data Under C/012/21 / Supply and Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 4,629.27 Implementati 2021-06-12 2021-08-12 2021-09-02 Installation of CCTV at the Improvement, Dissemination Quotations Envelope on 2021PHC Call Center and Use of Core Social and Economic Statistics Country-Specific Component: GP/HISWAP/GSS/SFTA/017/2 Pending Improving and modernizing Request for Single Stage - One 0 / Procurement of Software - IDA / 65730 Post Open - National 0.00 Implementati 2022-01-05 2022-03-09 2022-06-07 physical and statistical Quotations Envelope 15 and Antivirus - 38 on infrastructure Regional component: GP/HISWAP/GSS/PHC/PCM/01 Harmonization, Data Pending 5/21 / Supply of Packing and Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-12-22 2022-01-24 2022-02-23 Covering Materials and for Improvement, Dissemination Quotations Envelope on 2021 PHC and Use of Core Social and Economic Statistics GP/GSS/HISWAP/PO/ITE/015/ 21 / Procurement of ICT equipment for HISWA Project Pending Project Management and Request for Single Stage - One offices (Laptops - 10 units, IDA / 65760 Post Open - National 0.00 Implementati 2021-10-05 2021-11-21 2021-12-21 Monitoring and Evaluation Quotations Envelope Printers - 5 units, Scanners - on Photocopies - 2, Com-biding Machine - 3) Regional component: GP/GSS/HISWAP/PHC/FB/016/ Harmonization, Data Pending 21 / Procurement of Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-25 2021-07-29 2021-08-12 Additional Field Bags for Improvement, Dissemination Quotations Envelope on 2021PHC - 5,000 pieces and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/NP/017 Harmonization, Data /21 / Procurement of Pending Collection, Quality Request for Single Stage - One Additional Notepads for IDA / 65760 Post Open - National 0.00 Implementati 2021-06-26 2021-08-05 2021-08-19 Improvement, Dissemination Quotations Envelope 2021PHC Field work - 5,000 on and Use of Core Social and units Economic Statistics Regional component: GP/GSS/HISWAP/PHC/ALP/01 Harmonization, Data Pending 8/21 / Procurement Collection, Quality IDA / 65760 Post Direct Selection Direct 0.00 Implementati 2021-06-17 2021-06-22 2021-07-25 2021-08-08 Additional laptops for Improvement, Dissemination on 2021PHC Data processing and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/ATB/01 Harmonization, Data 9/21 / Procurement of Pending Collection, Quality Additional Tablets for IDA / 65760 Post Direct Selection Direct 0.00 Implementati 2021-06-15 2021-06-20 2021-07-16 2021-08-15 Improvement, Dissemination 2021PHC field work - 7,000 on and Use of Core Social and units Economic Statistics Regional component: GP/GSS/HISWAP/PHC/EC/019 Harmonization, Data /21 / Printing of 2021PHC Pending Collection, Quality Request for Single Stage - One Certificate of Enumeration for IDA / 65760 Post Open - National 0.00 Implementati 2021-06-25 2021-08-25 2021-09-08 Improvement, Dissemination Quotations Envelope Census Night - 500,000 on and Use of Core Social and copies Economic Statistics GP/GSS/HISWAP/PPA/OC/02/ 20 / Office equipment and Consumables to set up Census Offices (Office Desk & Country-Specific Component: Pending Swivel Chairs -20, Desk Trays- Improving and modernizing Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-10-05 2021-11-30 2021-12-30 32, Computers - 5 Perforaters physical and statistical Quotations Envelope on 20, Staplers - 50, Staple Pins infrastructure - 50Pkt, Externa HD- 5, Arc Files -100, Shredders - 10, Kettles -5, etc) Regional component: GP/GSS/HISWAP/PHC/PAM/02 Harmonization, Data Pending 0/21 / Printing of additional Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-25 2021-08-18 2021-09-01 field officer's manual to be Improvement, Dissemination Quotations Envelope on used as on the field - 5,000 and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/FL/022/ Harmonization, Data Pending 21 / Printing of Flyers for Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-23 2021-08-02 2021-09-01 2021PHC School Census Improvement, Dissemination Quotations Envelope on Programme - 50,000 copies and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/ARJ/023 Harmonization, Data /21 / Procurement of Pending Collection, Quality Request for Single Stage - One additional Reflective Jackets IDA / 65760 Post Open - National 0.00 Implementati 2021-07-05 2021-08-14 2021-09-13 Improvement, Dissemination Quotations Envelope for 2021PHC Enumerators - on and Use of Core Social and 5,000 pieces Economic Statistics Page 6 Regional component: GP/GSS/HISWAP/PHC/NM/025 Harmonization, Data Pending /21 / Procurement Nose Mask Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-30 2021-08-09 2021-09-08 for 2021PHC Field work - Improvement, Dissemination Quotations Envelope on 100,000 boxes and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/HS/026 Harmonization, Data /21 / Procurement of Hand Pending Collection, Quality Request for Single Stage - One Sanitizers (100ml) for IDA / 65760 Post Open - National 0.00 Implementati 2021-06-30 2021-08-09 2021-09-08 Improvement, Dissemination Quotations Envelope 2021PHC field work - 50,000 on and Use of Core Social and bottles Economic Statistics NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: Harmonization, Data GSS/HISWAP/NC/PCI/DS/001/ Collection, Quality 21 / Engagement of Public IDA / 65760 Prior Direct Selection Direct 137,465.39 Signed 2021-01-04 2020-12-25 2021-01-09 2021-01-29 2021-01-30 2021-02-18 2021-02-20 Improvement, Dissemination Cloud Infrastructure Provider and Use of Core Social and Economic Statistics CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: CS/HISWAP/GSS/DBCI/012/20 Harmonization, Data / Designing and building of a Consultant Collection, Quality resilient and reliable private IDA / 65760 Post Qualification Open - National 0.00 Canceled 2020-10-16 2020-03-03 2020-11-06 2020-12-04 2020-10-06 2021-01-03 2021-01-31 2021-04-01 Improvement, Dissemination cloud infrastructure for GSS to Selection and Use of Core Social and support Censuses and Surveys Economic Statistics INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: Harmonization, Data CS/HISWAP/GSS//PHC/CP/00 Individual Collection, Quality 2/20 / Consultant to develop IDA / 65730 Post Consultant Open 9,438.01 Signed 2020-02-07 2019-10-15 2020-03-11 2019-12-20 2020-03-25 2019-12-20 2020-04-15 2019-12-20 2020-07-14 Improvement, Dissemination Citizen Platform Selection and Use of Core Social and Economic Statistics Regional component: Harmonization, Data CS/HISWAP/GSS//PHC/CC/00 Individual Collection, Quality 4/20 / Consultant to establish IDA / 65730 Post Consultant Open 0.00 Canceled 2020-02-28 2020-04-01 2020-04-15 2020-05-13 2020-08-11 Improvement, Dissemination 2020 PHC Call Center Selection and Use of Core Social and Economic Statistics Regional component: CS/HISWAP/GSS//PHC/LMS/0 Harmonization, Data Individual 03/20 / Consultant to Collection, Quality IDA / 65730 Post Consultant Open 9,438.01 Signed 2020-02-20 2020-01-07 2020-03-24 2020-03-10 2020-04-07 2020-03-11 2020-05-05 2020-03-16 2020-08-03 develop Logistics Improvement, Dissemination Selection Management Systems and Use of Core Social and Economic Statistics Regional component: Harmonization, Data CS/HISWAP/GSS//CPIS/005/2 Individual Collection, Quality 0 / Consultant to upgrade CPI IDA / 65730 Post Consultant 0.00 Canceled 2021-05-20 2021-06-24 2021-07-08 2021-08-12 2021-11-10 Improvement, Dissemination Software Selection and Use of Core Social and Economic Statistics Regional component: CS/HISWAP/GSS//PHC/EB/001 Harmonization, Data Individual /20 / Upgrade and deploy a Collection, Quality IDA / 65730 Post Consultant Open 13,663.54 Signed 2019-10-10 2020-09-09 2019-11-15 2020-10-14 2019-12-06 2020-10-29 2020-02-18 2020-11-17 2020-04-18 customized enumerators Improvement, Dissemination Selection bureau and Use of Core Social and Economic Statistics Regional component: Harmonization, Data CS/HISWAP/GIS/P/CAPI/010/ Individual Collection, Quality 20 / Consultant to develop IDA / 65730 Post Consultant Open 0.00 Canceled 2021-02-26 2021-04-16 2021-05-07 2021-06-11 2021-06-20 Improvement, Dissemination CAPI for data collection Selection and Use of Core Social and Economic Statistics Regional component: CS/HISWAP/GSS/AGRIS/SMP/0 Harmonization, Data 07/20 / Sampling Consultant Individual Collection, Quality Pending (International)- professional IDA / 65730 Post Consultant Open 0.00 2022-04-25 2022-05-28 2022-06-11 2022-07-09 2022-07-18 Improvement, Dissemination Implementation fees (remote sensing survey Selection and Use of Core Social and specialist) for AGRIS Economic Statistics Regional component: Harmonization, Data CS/HISWAP/GSS/CPI/RB/008/ Individual Collection, Quality Pending 20 / Consultant to Review the IDA / 65730 Post Consultant Open 0.00 2022-04-25 2022-05-28 2022-06-11 2022-07-09 2022-10-07 Improvement, Dissemination Implementation CPI Rebase (local) Selection and Use of Core Social and Economic Statistics Regional component: CS/HISWAP/MOGCSP/P/CAPI/ Harmonization, Data 011/20 / Consultant to Individual Collection, Quality Pending develop dissemination IDA / 65730 Post Consultant Open 0.00 2022-06-30 2022-08-18 2022-09-08 2022-10-13 2023-01-11 Improvement, Dissemination Implementation /communication Plan for Selection and Use of Core Social and Gender Statistics Economic Statistics Page 7 Regional component: Harmonization, Data CS/HISWAP/GSS/AGRIS/SMP/0 Individual Collection, Quality Pending 09/20 / Consultant to Review IDA / 65730 Post Consultant Open 0.00 2022-07-25 2022-08-27 2022-09-10 2022-10-15 2023-01-13 Improvement, Dissemination Implementation the PBCI Selection and Use of Core Social and Economic Statistics Regional component: CS/GSS/HISWAP/CSW/IND/00 Harmonization, Data Individual 1/21 / Consultancy for CSWeb Collection, Quality IDA / 65760 Post Consultant Open 26,055.29 Signed 2021-06-11 2021-04-20 2021-07-14 2021-05-19 2021-07-28 2021-05-31 2021-08-18 2021-05-21 2021-09-02 Server Implementation and Improvement, Dissemination Selection Deployment for 2021 PHC and Use of Core Social and Economic Statistics CS/HISWAP/GSS/SEEA/006/20 Regional component: / Consultant for Compilation Harmonization, Data of Environment Statistics Individual Collection, Quality Pending using SEEA on Forestry, IDA / 65730 Post Consultant Open 0.00 2021-09-30 2021-11-02 2021-11-16 2021-12-14 2022-03-14 Improvement, Dissemination Implementation Fisheries, Water, and Selection and Use of Core Social and Environmental goods and Economic Statistics services Page 8 PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-02-19 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / V1150, IDA / D2860, IDA / 62130, TF / A7130, TF / A7131 M Executing Agency(ies): inistry of Environnement/Directorate of Environment WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 39 / Aménagement de Component 4: National Single Stage - One 2019-02- bureaux pour l’unité de IDA / V1150 Post Request for Bids Open - National 90,000.00 81,133.59 Terminated 2018-05-07 2018-04-06 2018-05-12 2018-06-23 2018-05-07 2018-07-23 2018-05-26 2018-08-27 2018-08-29 Coordination Envelope 23 gestion du projet WACA 59 / Travaux d'aménagement du R+1 des bureaux pour l'UGP, Construction du mur de séparation, d'un parking pour 10 voitures, un poste Component 4: National Single Stage - One 2020-04- IDA / D2860 Post Request for Bids Open - National 190,000.00 0.00 Canceled 2019-06-27 2019-07-02 2019-08-13 2019-09-12 2019-10-17 d'hébergement (des Coordination Envelope 14 compteurs et du groupe électrogène) et aménagement de la cour (aires de circulation et jardin) 85 / Travaux d’aménagement de la cour du Ministère de Component 2: Strengthening l'environnement, du Request for Single Stage - One 2021-01- IDA / D2860 the Policy and Institutional Post Limited 105,000.00 126,079.40 Signed 2020-05-19 2020-04-24 2020-07-14 2020-08-28 développement durable et de Quotations Envelope 10 Framework la protection de la nature - en un (01) lot 114 / Travaux de construction de la clôture de Pending Component 4: National Request for Single Stage - One 2020-12- la direction régionale des IDA / D2860 Post Open - National 70,000.00 0.00 Implementat 2020-07-14 2020-09-08 Coordination Quotations Envelope 08 forestiers de la réserve de ion Togodo Nord à ATAKPAME 88 / Travaux d'aménagement Pending du R+1 des bureaux pour Component 4: National Request for Single Stage - One 2021-03- IDA / D2860 Post Limited 152,728.00 0.00 Implementat 2020-07-12 2020-09-06 l'UGP WACA ResIP, en lot Coordination Quotations Envelope 05 ion unique 104 / Travaux de protection Component 3: Strengthening d’urgence de la côte par la 2021-02- IDA / D2860 National Physical and Social Post Direct Selection Direct 909,090.90 899,211.65 Signed 2020-07-08 2020-07-03 2020-07-13 2020-08-19 2020-08-17 2020-09-17 technique de juxtaposition de 13 Investments puits en fûs granulitique. TG-WACA TOGO-204666- Component 3: Strengthening Pending CW-RFB / Réhabilitation de 90 Single Stage - One 2021-08- TF / A7130 National Physical and Social Post Request for Bids Open - National 210,606.00 0.00 Implementat 2021-01-06 2021-01-11 2021-02-10 2021-03-12 2021-04-16 km de piste, 7 ponceaux et 15 Envelope 14 Investments ion radiers à Togodo TG-WACA TOGO-204668- Component 3: Strengthening Request for Single Stage - One 2021-04- CW-RFQ / Construction de TF / A7131 National Physical and Social Post Limited 30,000.00 0.00 Canceled 2021-01-20 2021-03-18 Quotations Envelope 17 deux (02) bâtiments à Investments TOGODO TG-WACA TOGO-204671- Component 3: Strengthening CW-RFQ / Travaux de Request for Single Stage - One 2021-09- TF / A7130 National Physical and Social Post Limited 60,000.00 0.00 Canceled 2021-01-25 2021-03-22 construction de deux (02) Quotations Envelope 18 Investments étangs et de deux (02) forages à TOGODO Component 2: Strengthening 92 / Travaux de construction Request for Single Stage - One 2021-02- IDA / D2860 the Policy and Institutional Post Limited 106,000.00 0.00 Canceled 2020-07-01 2020-08-26 du siège de l'ANGE Quotations Envelope 22 Framework TG-WACA TOGO-222964- National CW-RFQ / renforcement Component 3: Strengthening Procurement Pending (travaux de réhabilitation) du Request for Single Stage - One 2022-04- IDA / D2860 National Physical and Social Post Open - National Document - 1 109,000.00 0.00 Implementat 2021-07-20 2021-10-07 poste secours d'urgence (PSR) Quotations Envelope 05 Investments Envelope process ion du corps des sapeurs - (Non Bank-SPD) pompiers de la Région de Lomé Nord TG-WACA TOGO-239057- CW-RFB / construction de National trois (03) postes de relais Component 2: Strengthening Procurement Pending forestiers équipés de Single Stage - One 2022-02- TF / A7130 the Policy and Institutional Post Request for Bids Open - National Document - 1 90,000.00 0.00 Implementat 2021-07-23 2021-07-28 2021-08-27 2021-09-26 2021-10-31 panneaux solaires et de Envelope 28 Framework Envelope process ion forages à motricité humaine (Non Bank-SPD) dans le complexe d’aires protégées de Togodo. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 35 / Acquisition de matériels Component 4: National Request for Single Stage - One IDA / V1150 Post Limited 15,000.00 0.00 Canceled 2018-05-13 2018-07-08 2019-01-04 informatiques Coordination Quotations Envelope 37 / Acquisition du mobilier Component 4: National Request for Single Stage - One de bureau pour la IDA / V1150 Post Limited 25,000.00 23,847.22 Signed 2018-07-17 2018-09-03 2018-09-11 2018-10-25 2019-03-10 Coordination Quotations Envelope coordination du projet Page 1 34 / Achat de fournitures de bureau, matériels de bureau et matériels d'entretien de bureau en 03 lots. Lot 1 fournitures de bureau Component 4: National Request for Single Stage - One IDA / V1150 Post Limited 10,000.00 7,637.09 Signed 2018-02-03 2018-02-16 2018-03-31 2018-08-08 2018-09-27 (papiers rames, bics,..) Coordination Quotations Envelope Lot 2 matériels de bureau (reliure) et Lot 3 matériels d'entretien de bureau (gel désinfectant, ...). 35 BIS / Acquisition de fournitures informatiques et de matériels informatiques en 02 lots : Lot 1 fournitures informatiques (cartouches Component 4: National Request for Single Stage - One IDA / V1150 Post Limited 27,000.00 26,469.61 Signed 2018-01-09 2018-01-11 2018-03-06 2018-08-08 2018-09-02 d'encre, antivirus, disques Coordination Quotations Envelope durs) et Lot 2 matériels informatiques (ordinateurs de bureau, ordinateurs portables, scanners ..) 41BIS / Le matériel roulant sera composé comme suit : Lot 1: 2 pick-up 4x4 double Component 4: National Request for Single Stage - One cabine tropicalisés pour les IDA / D2860 Post Limited 294,000.00 172,009.80 Signed 2019-04-20 2019-10-10 2019-06-15 2020-05-26 2019-12-12 Coordination Quotations Envelope missions de terrain, Lot2: 01 station wagon , Lot3: 01 mini bus. 65 / Acquisition de matériel Component 4: National Request for Single Stage - One roulant (moto) pour les 7 TF / A7130 Post Limited 40,000.00 0.00 Canceled 2019-07-01 2019-08-26 2020-02-22 Coordination Quotations Envelope CPDD et le coursier de l'UGP 66 / Acquisition de GPS pour Under les CPDD (07) et l'unité de Component 4: National Request for Single Stage - One TF / A7130 Post Limited 20,000.00 0.00 Implementati 2019-07-02 2019-09-10 2019-08-27 2020-02-23 gestion du projet (5) soit au Coordination Quotations Envelope on total 12 GPS 58 / Acquisition de matériel et fourniture informatique pour le projet (Ordinateur bureau +portable en poste de trav, copieur, imprimante Component 4: National Request for Single Stage - One IDA / D2860 Post Limited 50,000.00 0.00 Canceled 2019-06-16 2019-08-11 2020-02-07 couleur, blanc noir, clé USB Coordination Quotations Envelope multi copieur, disque dure, vidéo projecteur, onduleurs, modem pour connexion Wifi, camera... 74 / Acquisition de 2 Component 2: Strengthening véhicules de terrain pour Request for Single Stage - One IDA / D2860 the Policy and Institutional Post Limited 85,000.00 0.00 Canceled 2019-06-26 2019-08-21 2020-02-17 l'Agence Nationale de Gestion Quotations Envelope Framework de l'Environnement 93 / Fournitures de bureau Pending Component 4: National Request for Single Stage - One pour l'UGP ( Accord cadre TF / A7130 Post Open 20,000.00 0.00 Implementati 2020-04-20 2020-06-15 2020-12-12 Coordination Quotations Envelope attribution par article) on 98 / Production des supports Component 4: National Request for Single Stage - One IDA / D2860 Post Open - National 36,364.00 16,660.05 Signed 2020-04-14 2020-06-09 2021-05-14 2020-12-06 de communications - un lot Coordination Quotations Envelope 83 / Acquisition de matériel et fourniture informatique, et matériels bureautique pour Component 2: Strengthening Single Stage - One les CPDD, l'ANGE,Direction de IDA / D2860 the Policy and Institutional Post Request for Bids Open - National 473,091.00 229,876.88 Signed 2020-06-25 2020-07-23 2020-06-30 2020-08-11 2020-09-25 2020-09-10 2020-10-26 2020-10-15 2021-04-23 2021-01-15 Envelope l'Environnement, Economie Framework Bleue et l'UGP WACA - Lot unique Under 97 / Réalisation des films Component 4: National Request for Single Stage - One IDA / D2860 Post Open - National 27,909.00 0.00 Implementati 2020-05-27 2020-07-22 2021-01-18 documentaires Coordination Quotations Envelope on 107 / Acquisition de Component 2: Strengthening matériels roulants pour le UN Agencies IDA / D2860 the Policy and Institutional Post Direct 232,727.00 0.00 Canceled 2020-06-02 2020-06-07 2020-07-12 2020-09-30 Haut Conseil pour la Mer, (Direct) Framework l’ANGE et l’UGP WACA ResIP 84BIS / Acquisition de Component 2: Strengthening matériels roulants (engins TP) UN Agencies IDA / D2860 the Policy and Institutional Post Direct 531,000.00 0.00 Canceled 2020-06-02 2020-06-07 2020-07-12 2020-11-12 pour la Mairie d’Aného – lot (Direct) Framework unique 81 / Acquisition de matériels Component 2: Strengthening roulants pour le Request for Single Stage - One IDA / D2860 the Policy and Institutional Post Limited 187,272.73 0.00 Canceled 2020-04-13 2020-06-08 2020-12-05 développement de l'économie Quotations Envelope Framework bleue et l'ANGE - 02 Lots 109 / Acquisition de trois Component 4: National Request for Single Stage - One (03) téléphones portables IDA / D2860 Post Limited 2,190.00 3,558.26 Signed 2020-08-16 2020-09-08 2020-10-11 2020-09-14 2020-10-27 Coordination Quotations Envelope pour l’UGP WACA ResIP 118 / Acquisition de mobilier Component 2: Strengthening Under Request for Single Stage - One de bureau pour l'ANGE et IDA / D2860 the Policy and Institutional Post Limited 36,364.00 0.00 Implementati 2020-10-05 2020-11-30 2021-01-28 Quotations Envelope l'Economie Bleue Framework on 120 / Acquisition de technologie des systèmes aériens sans pilotes (drone, Component 2: Strengthening Under logiciels, de matériel et Request for Single Stage - One IDA / D2860 the Policy and Institutional Post Limited 70,000.00 0.00 Implementati 2020-10-05 2020-11-30 2021-03-01 fourniture informatiques, Quotations Envelope Framework on Formations) pour la production d'une cartographie 2D et 3D de gestion de la côte TG-WACA TOGO-211741-GO- Component 2: Strengthening UN / Acquisition de matériel UN Agencies IDA / D2860 the Policy and Institutional Post Direct 836,049.00 836,049.00 Signed 2020-10-15 2020-06-02 2020-10-16 2020-11-25 2020-11-22 2020-12-11 2021-02-20 roulant pour la coordination (Direct) Framework et les partenaires Page 2 TG-WACA TOGO-223544-GO- RFQ / Edition et vulgarisation Component 2: Strengthening Pending Request for Single Stage - One du guide d'intégration de IDA / D2860 the Policy and Institutional Post Limited 5,544.00 0.00 Implementati 2021-05-31 2021-07-26 2021-08-25 Quotations Envelope l'économie bleu dans les Framework on documents de planification TG-WACA TOGO-223532-GO- RFQ / Acquisition d'équipement pour la mise en place d'une base de données Component 2: Strengthening Pending Request for Single Stage - One de gestion des ouvrages IDA / D2860 the Policy and Institutional Post Open - National 50,000.00 0.00 Implementati 2021-07-20 2021-09-14 2021-12-13 Quotations Envelope côtiers (serveur, ordinateurs Framework on portables, disque durs externe, appareil photo professionnel, etc...) TG-WACA TOGO-223620-GO- RFQ / acquisition de matériel Component 2: Strengthening Pending et équipement de laboratoire Single Stage - One IDA / D2860 the Policy and Institutional Post Request for Bids Open - National 110,000.00 0.00 Implementati 2021-07-15 2021-07-20 2021-08-19 2021-09-18 2021-10-23 2021-12-22 pour le département de Envelope Framework on géographie de l'université de Lomé TG-WACA TOGO-222191-GO- RFQ / Achat de véhicule Component 2: Strengthening Pending Station WAGON pour le Request for Single Stage - One IDA / 62130 the Policy and Institutional Post Limited 60,000.00 0.00 Implementati 2021-05-25 2021-07-20 2021-08-19 Ministère de la Protection Quotations Envelope Framework on côtière, de la Pêche et de l'Economie Maritime TG-WACA TOGO-223503-GO- RFQ / Equipements de suivi et Component 2: Strengthening Pending Request for Single Stage - One surveillance pour les TF / A7130 the Policy and Institutional Post Limited 18,182.00 0.00 Implementati 2021-07-05 2021-08-30 2021-09-29 Quotations Envelope communautés locales (30 Framework on tablettes ) TG-WACA TOGO-234936-GO- Component 2: Strengthening Pending Request for Single Stage - One RFQ / achat de deux (02) TF / A7130 the Policy and Institutional Post Limited 5,000.00 0.00 Implementati 2021-08-04 2021-09-29 2021-11-28 Quotations Envelope drones Framework on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 36 / Edition du plan d'investissement et du Component 4: National Request for Single Stage - One document d'analyse du cadre IDA / V1150 Post Limited 18,000.00 20,365.63 Signed 2018-02-21 2018-02-16 2018-04-18 2018-08-01 2018-10-15 Coordination Quotations Envelope juridique institutionnel de gestion intégrée du littoral 38 / Paramétrage du logiciel Under Component 4: National de gestion financière du IDA / V1150 Post Direct Selection Direct 13,000.00 0.00 Implementati 2018-07-05 2018-11-14 2018-07-10 2018-11-14 2018-08-14 2019-02-10 Coordination PGICT pour le projet WACA on Under 52 / Recrutement d'un Component 4: National Request for Single Stage - One IDA / D2860 Post Limited 4,000.00 0.00 Implementati 2019-06-29 2020-06-08 2019-08-24 2020-02-20 service d'entretien Coordination Quotations Envelope on 77 / Police d'assurance pour Under Component 4: National Request for Single Stage - One le personnel recruté par le IDA / D2860 Post Limited 20,000.00 0.00 Implementati 2019-11-25 2019-09-10 2020-01-20 2020-07-18 Coordination Quotations Envelope projet WACA ResIP on 17 BIS / Mise en place d'un système informatisé de suivi Component 4: National Single Stage - One du projet (acquisition, IDA / D2860 Post Request for Bids Open - National 40,000.00 0.00 Canceled 2019-02-20 2019-05-08 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09 Coordination Envelope installation et formation des utilisateurs) 119 / Service de gardiennage Component 4: National Request for Single Stage - One IDA / D2860 Post Limited 8,182.00 8,602.22 Signed 2020-08-17 2020-09-09 2020-10-12 2021-04-23 2021-10-09 des bureaux de l'UGP Coordination Quotations Envelope CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 14 / Etude de faisabilité Component 3: Strengthening technique de la protection Quality And Cost- IDA / V1150 National Physical and Social Prior Open - International 2,000,000.00 0.00 Canceled 2018-02-06 2018-02-27 2018-04-12 2018-05-10 2018-06-09 2018-07-14 2018-08-18 2019-08-18 côtière du segment Based Selection Investments transfrontalier Bénin-Togo 15 / Etude d'Impact Environnemental et Social Component 2: Strengthening Quality And Cost- (EIES) de la protection côtière IDA / V1150 the Policy and Institutional Post Open - International 320,000.00 0.00 Canceled 2018-02-08 2018-03-01 2018-04-14 2018-05-12 2018-06-11 2018-07-16 2018-08-20 2019-08-20 Based Selection du segment transfrontalier Framework Bénin-Togo 19 / Etude d'Impact Environnemental et Social Component 2: Strengthening Consultant (EIES) pour le curage IDA / V1150 the Policy and Institutional Post Qualification Open - National 200,000.00 0.00 Canceled 2018-09-25 2018-10-16 2018-11-29 2018-12-29 2019-02-02 2019-08-01 mécanique du chenal Gbaga Framework Selection et de restauration de ces écosystèmes associés 46 / Evaluation du coût de la Component 2: Strengthening Consultant dégradation historique de la IDA / D2860 the Policy and Institutional Post Qualification Open - National 130,000.00 149,746.25 Signed 2019-01-17 2019-05-22 2019-02-07 2019-07-08 2019-03-23 2019-11-28 2019-04-22 2020-12-22 2019-05-27 2021-04-23 2019-11-23 côte y compris la vulnérabilité Framework Selection des communautés côtières 42BIS / Etude de faisabilité technique de l'installation Component 3: Strengthening d'une vanne au niveau du Quality And Cost- IDA / D2860 National Physical and Social Prior Open - International 650,000.00 0.00 Canceled 2019-03-05 2019-03-26 2019-05-09 2019-06-06 2019-07-06 2019-08-10 2019-09-14 2020-09-13 pont de la lagune d'Aného et Based Selection Investments l'étude hydrodynamique du système fluvio-lagunaire Page 3 43 / Etude approfondie de Component 3: Strengthening faisabilité du traitement des Quality And Cost- IDA / 62130 National Physical and Social Prior Open - International 600,000.00 0.00 Canceled 2019-03-12 2019-04-02 2019-05-16 2019-06-13 2019-07-13 2019-08-17 2019-09-21 2020-09-20 boues de phosphates rejetées Based Selection Investments en mer 44 / Elaboration du plan Component 4: National Quality And Cost- IDA / D2860 Post Open - International 250,000.00 0.00 Canceled 2019-02-11 2019-03-04 2019-04-17 2019-05-15 2019-06-14 2019-07-19 2019-08-23 2020-08-22 spatial marin et côtier Coordination Based Selection Component 2: Strengthening 45 / Evaluation du capital Quality And Cost- IDA / D2860 the Policy and Institutional Post Open - International 300,000.00 0.00 Canceled 2019-02-12 2019-03-05 2019-04-18 2019-05-16 2019-06-15 2019-07-20 2019-08-24 2020-08-23 naturel de la zone côtière Based Selection Framework 49 / Audits financiers et Component 4: National Least Cost comptables du projet - IDA / D2860 Post Open - National 45,000.00 24,687.83 Signed 2019-02-11 2019-04-18 2019-03-04 2019-07-08 2019-04-17 2019-10-10 2019-05-15 2020-02-06 2019-06-14 2020-03-11 2019-07-19 2020-05-19 2019-08-23 2020-06-29 2020-02-19 Coordination Selection exercices 2017, 2018 et 2019 3 BIS / Etudes de faisabilité techniques de dragage et de stabilisation des berges de la Component 3: Strengthening Quality And Cost- lagune et du lac Togo, et pour IDA / D2860 National Physical and Social Post Open - International 250,000.00 1,061,119.41 Signed 2018-10-04 2018-05-18 2018-10-25 2018-12-08 2019-08-28 2019-01-05 2019-10-10 2019-02-04 2019-10-25 2019-03-11 2019-12-13 2019-04-15 2020-08-26 2020-04-14 Based Selection la Construction et le curage Investments de caniveau, de bassin d'orage, de retenue d'eau 48 / Etude d'Impact Environnemental et Social Component 3: Strengthening Consultant (EIES) pour le curage TF / A7130 National Physical and Social Post Qualification Open - National 100,000.00 0.00 Canceled 2018-12-28 2019-01-03 2019-01-18 2019-03-03 2019-04-02 2019-05-07 2019-11-03 mécanique du chenal Gbaga Investments Selection et de restauration de ces écosystèmes associés 47B / Etude de faisabilité technique pour le curage Component 3: Strengthening Quality And Cost- Under mécanique du chenal de TF / A7130 National Physical and Social Prior Open - International 600,000.00 0.00 2019-04-26 2019-04-18 2019-05-17 2019-07-23 2019-06-30 2020-10-17 2019-07-28 2020-10-26 2019-08-27 2021-01-14 2019-10-01 2021-04-13 2019-11-05 2020-11-04 Based Selection Implementation Gbaga et de la restauration de Investments ces écosystèmes associés 47 / Etude de faisabilité technique du curage Component 3: Strengthening Quality And Cost- mécanique du chenal Gbaga TF / A7130 National Physical and Social Post Open - International 300,000.00 0.00 Canceled 2018-12-28 2019-01-03 2019-01-18 2019-03-03 2019-03-31 2019-04-30 2019-06-04 2019-07-09 2020-07-08 Based Selection et de restauration de ces Investments écosystèmes associés 48B / Etude d'Impact Environnemental et Social Component 3: Strengthening Consultant (EIES) pour le curage Under TF / A7130 National Physical and Social Post Qualification Open - International 200,000.00 0.00 2019-04-26 2019-04-17 2019-05-17 2019-06-30 2019-08-13 2019-07-30 2018-08-08 2019-09-03 2020-03-01 mécanique du chenal Gbaga Implementation Investments Selection et de restauration de ces écosystèmes associés 40 / Surveillance et contrôle Consultant Component 4: National des travaux d'aménagement IDA / V1150 Post Qualification Open - National 18,000.00 0.00 Canceled 2018-07-11 2018-08-01 2018-09-14 2018-10-14 2018-11-18 2019-05-17 Coordination des bureaux du Projet WACA Selection 62 / Élaboration du plan Component 3: Strengthening Consultant d'aménagement participatif et TF / A7130 National Physical and Social Post Qualification Open - International 140,000.00 154,345.80 Signed 2019-08-28 2020-01-07 2019-09-18 2020-06-26 2019-11-01 2020-10-26 2019-12-01 2021-02-09 2020-01-05 2021-04-23 2020-07-03 des outils de gestion de la Investments Selection forêt communautaire d'Avévé  63 / Elaboration du plan d'aménagement participatif et Component 3: Strengthening Consultant des outils de gestion de la TF / A7130 National Physical and Social Post Qualification Open - International 150,000.00 154,345.80 Signed 2019-08-28 2020-01-07 2019-09-18 2020-06-26 2019-11-01 2020-10-15 2019-12-01 2021-02-09 2020-01-05 2021-04-23 2020-07-03 forêt communautaire de Kodjo- Investments Selection Gati 60 / Recrutement d'une structure ( centre de formation) pour la formation Component 3: Strengthening Consultant Under et l'accompagnement des TF / A7130 National Physical and Social Post Qualification Open - National 55,000.00 244,722.82 2019-08-28 2019-08-21 2019-09-18 2019-11-01 2020-05-05 2019-12-01 2020-06-10 2020-01-05 2020-07-03 Implementation acteurs communautaires sur Investments Selection les bonnes pratiques en gestion durable des terres. 78 / Assistance technique et Component 2: Strengthening Consultant Under contrôle des activités TF / A7130 the Policy and Institutional Post Qualification Open - National 220,982.00 0.00 2020-01-14 2020-01-15 2020-02-04 2020-03-19 2020-04-18 2020-05-23 2020-11-19 Implementation communautaires Framework Selection 82 / Etude sur la situation des plantes envahissantes, des modèles de gestion et de Component 3: Strengthening Consultant Under valorisation dans la sous- TF / A7130 National Physical and Social Post Qualification Open - International 80,000.00 0.00 2019-12-30 2020-03-30 2020-01-20 2020-03-04 2020-04-03 2020-05-08 2020-11-04 Implementation région et les applications Investments Selection possibles dans la zone du projet 40 C / Surveillance et contrôle des travaux d'aménagement du R + 1 des bureaux de l'UGP, Consultant Component 4: National Construction du mur de IDA / D2860 Post Qualification Open - National 20,000.00 0.00 Canceled 2019-08-28 2019-09-18 2019-11-01 2019-12-01 2020-01-05 2020-07-03 Coordination séparation, d'un parking pour Selection 10 voitures, d'un poste d'achat et d'un aménagement de cour. 105 / Recrutement d'un cabinet pour l'actualisation de l'étude de faisabilité technique du projet d'assainissement Component 3: Strengthening des eaux usées à la plage de Quality And Cost- Under IDA / D2860 National Physical and Social Post Open - International 120,000.00 0.00 2020-06-30 2020-09-16 2020-07-21 2021-01-20 2020-09-03 2021-04-15 2020-10-01 2020-10-31 2020-12-05 2021-01-09 2022-01-09 Lomé, réhabilitation du réseau Based Selection Implementation Investments embryonnaire d'assainissement collectif des eaux usées de la ville de Lomé au Togo 113 / Etude d'avant projet détaillé (APD) pour la construction de la nouvelle Consultant Component 4: National Pending direction régionale des IDA / D2860 Post Qualification Open - National 40,000.00 0.00 2020-07-27 2020-08-17 2020-09-30 2020-10-30 2020-12-04 2021-06-02 Coordination Implementation forestiers de la réserve de Selection faune de Togodo Nord à Atakpamé Page 4 121 / Recrutement d'un cabinet pour le contrôle et surveillance des travaux Component 3: Strengthening Consultant d’urgence de protection IDA / D2860 National Physical and Social Post Qualification Limited 910.00 90,871.35 Signed 2020-08-07 2020-08-09 2020-08-21 2020-08-25 2020-09-20 2020-11-10 2020-10-25 2021-02-01 2021-02-24 contre l’érosion côtière des Investments Selection habitations vulnérables sur le littoral togolais allant de Gbodjomé à Agbodrafo. TG-WACA TOGO-222420-CS- CQS / Elaboration de la carte Component 2: Strengthening Consultant de vulnérabilité de la côte Pending TF / A7130 the Policy and Institutional Post Qualification Open - National 54,545.00 0.00 2021-06-10 2021-07-01 2021-08-14 2021-09-13 2021-10-18 2022-01-16 togolaise face aux menaces Implementation Framework Selection de pollution par les hydrocarbures (ABC) TG-WACA TOGO-223531-CS- CQS / Etude de faisabilité Component 2: Strengthening Consultant technique pour la création et Pending IDA / D2860 the Policy and Institutional Post Qualification Open - National 92,000.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 l'opérationnalisation de Implementation Framework Selection l'observatoire national sur le littoral TG-WACA TOGO-223546-CS- Component 2: Strengthening Consultant Pending CQS / Elaboration du plan IDA / D2860 the Policy and Institutional Post Qualification Open - National 32,000.00 0.00 2021-07-08 2021-07-29 2021-09-11 2021-10-11 2021-11-15 2021-11-27 Implementation spatial marin et côtier Framework Selection TG-WACA TOGO-224375-CS- CDS / Etude de faisabilité Component 3: Strengthening Consultant Pending technique de la mise en place IDA / 62130 National Physical and Social Post Qualification Open - International 90,909.00 0.00 2021-07-30 2021-08-20 2021-10-03 2021-11-02 2021-12-07 2022-06-05 Implementation d'un bypass au port autonome Investments Selection de Lomé INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1 / Elaboration du Cadre de Component 2: Strengthening Individual Gestion Environnementale et IDA / V1150 the Policy and Institutional Post Consultant Limited 27,500.00 23,893.15 Signed 2017-07-18 2017-06-22 2017-07-23 2017-09-07 2018-01-29 2017-09-28 2018-03-05 2017-11-29 2018-07-17 Sociale (CGES) Framework Selection 2 / Elaboration du Cadre de Component 2: Strengthening Individual Politique de Réinstallation IDA / V1150 the Policy and Institutional Post Consultant Limited 24,000.00 20,223.92 Signed 2017-06-22 2017-06-22 2017-08-24 2017-09-07 2017-09-29 2017-09-29 2017-11-29 2017-11-29 2018-01-12 (CPR) Framework Selection 4 / Etude d'impact environnemental et social des Component 2: Strengthening Individual Under dragages et de la construction IDA / V1150 the Policy and Institutional Post Consultant Limited 18,000.00 0.00 2017-11-12 2017-11-12 2018-01-27 2018-01-22 2018-02-17 2018-08-08 2018-03-24 2018-04-24 Implementation des ouvrages de lutte contre Framework Selection les inondations 13 / Elaboration de la Component 4: National stratégie de passation des IDA / V1150 Post Direct Selection Direct 14,000.00 13,130.33 Signed 2017-12-12 2017-12-12 2017-12-22 2017-12-22 2018-02-09 2018-08-29 2018-03-29 Coordination marchés (PPSD) 6 / Recrutement d'un Individual Component 4: National spécialiste en passation des IDA / V1150 Post Consultant Open 24,000.00 0.00 Canceled 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 Coordination marchés Selection Individual 8 / Recrutement d'un Component 4: National IDA / V1150 Post Consultant Open 24,000.00 0.00 Canceled 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 spécialiste en suivi-évaluation Coordination Selection 9 / Recrutement d'un Individual Component 4: National spécialiste en sauvegarde IDA / V1150 Post Consultant Open 24,000.00 0.00 Canceled 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 Coordination sociale Selection Individual 10 / Recrutement d'un Component 4: National IDA / V1150 Post Consultant Open 24,000.00 0.00 Canceled 2018-02-20 2018-04-10 2018-05-01 2018-06-05 2018-12-02 spécialiste en communication Coordination Selection 9 BIS / Recrutement d'un Individual Component 4: National Under spécialiste en sauvegarde IDA / V1150 Post Consultant Open 24,000.00 0.00 2018-04-26 2018-05-18 2018-06-14 2018-07-05 2019-04-18 2018-08-09 2019-02-05 Coordination Implementation sociale Selection Individual 10 BIS / Recrutement d'un Component 4: National Under IDA / V1150 Post Consultant Open 24,000.00 0.00 2018-06-03 2018-02-18 2018-07-22 2019-04-11 2018-08-12 2019-06-28 2018-09-16 2019-03-15 spécialiste en communication Coordination Implementation Selection 7 / Recrutement d'un Individual Component 4: National Under ingénieur génie civil (génie IDA / V1150 Post Consultant Open 28,000.00 0.00 2018-05-17 2018-08-13 2018-07-05 2018-07-26 2019-04-18 2018-08-30 2019-02-26 Coordination Implementation côtier) Selection Individual 27 / Recrutement d'un Component 4: National Under IDA / V1150 Post Consultant Open 24,000.00 0.00 2018-05-24 2019-02-03 2018-07-12 2019-06-25 2018-08-02 2018-09-06 2019-03-05 auditeur interne du projet Coordination Implementation Selection Individual 11 / Recrutement de Component 4: National IDA / V1150 Post Consultant Open 12,000.00 0.00 Canceled 2018-02-20 2018-04-10 2018-05-01 2018-06-05 2018-12-02 secrétaire caissière Coordination Selection 7 / Recrutement d'un Individual Component 4: National ingénieur génie civil (génie IDA / V1150 Post Consultant Open 24,000.00 0.00 Canceled 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 Coordination côtier) Selection 3 / Réalisation d'études Component 3: Strengthening Individual techniques d'ouvrages de IDA / V1150 National Physical and Social Post Consultant Limited 53,000.00 0.00 Canceled 2017-11-08 2017-11-13 2018-03-26 2018-04-30 2018-10-27 lutte contre les inondations Investments Selection Individual 12 / Recrutement d'un Component 4: National IDA / V1150 Post Consultant Limited 30,000.00 0.00 Canceled 2017-11-08 2017-11-13 2017-12-04 2018-01-08 2018-07-07 Assistant technique au projet Coordination Selection 25 / Recrutement d'un Individual Component 4: National assistant en passation des IDA / V1150 Post Consultant Open 10,000.00 0.00 Canceled 2018-04-26 2018-06-14 2018-07-05 2018-08-09 2019-02-05 Coordination marchés Selection Page 5 24 BIS / Recrutement d'un Individual Component 4: National Under spécialiste en gestion IDA / D2860 Post Consultant Open 24,000.00 0.00 2018-08-29 2018-09-18 2018-11-02 2018-11-23 2019-04-18 2018-12-28 2019-06-26 Coordination Implementation financière Selection 24 / Recrutement d'un Individual Component 4: National assistant au spécialiste en IDA / V1150 Post Consultant Open 10,000.00 0.00 Canceled 2018-08-29 2018-10-31 2018-11-21 2018-12-26 2019-06-24 Coordination gestion financière Selection 50 / Etude pour la mise en place du système national d'informations côtières Component 2: Strengthening Individual Under (Définition et harmonisation IDA / D2860 the Policy and Institutional Post Consultant Open 70,000.00 0.00 2019-04-02 2019-06-05 2019-05-21 2019-06-11 2019-07-16 2020-01-12 Implementation des standards de collecte, Framework Selection traitement et diffusion de données pour l'observatoire) 6 BIS / Recrutement d'un Individual Component 4: National spécialiste en passation des IDA / D2860 Post Consultant Open 24,000.00 37,051.31 Signed 2018-08-27 2018-10-31 2019-02-15 2018-11-21 2019-08-19 2018-12-26 2019-08-09 2019-06-24 Coordination marchés Selection 69 / Actualisation des Component 2: Strengthening Individual manuels de procédure de IDA / D2860 the Policy and Institutional Post Consultant Open 13,000.00 13,023.07 Signed 2019-06-17 2019-06-07 2019-08-05 2020-11-17 2019-08-26 2020-11-23 2019-09-30 2021-04-23 2020-03-28 l'ANGE Framework Selection 67 / Élaboration du plan de développement des Component 2: Strengthening Individual Ressources Humaines du TF / A7130 the Policy and Institutional Post Consultant Open 15,000.00 0.00 Canceled 2019-06-19 2019-06-17 2019-08-07 2019-08-28 2019-10-02 2020-03-30 Ministère de l'Environnement, Framework Selection du Développement Durable et de la Protection de la Nature 64 / Appui à l'analyse institutionnelle du Ministère de l'Environnement, du Développement Durable et de Component 2: Strengthening Individual la Protection de la Nature TF / A7130 the Policy and Institutional Post Consultant Open 15,000.00 16,668.25 Signed 2019-06-19 2019-06-07 2019-08-07 2020-11-17 2019-08-28 2020-11-23 2019-10-02 2021-04-23 2020-03-30 relative à la mise en œuvre Framework Selection des conventions internationales signées par le Togo Component 3: Strengthening Individual 68 / Élaboration du cadre Under TF / A7130 National Physical and Social Post Consultant Open 24,000.00 0.00 2019-06-17 2019-06-07 2019-08-05 2019-11-04 2019-08-26 2019-09-30 2020-03-28 fonctionnel (procédural) Implementation Investments Selection 40B / Surveillance contrôle des Travaux d'aménagement du R+1 des bureaux pour l'UGP, Construction du mur de Individual séparation, d'un parking pour Component 4: National IDA / V1150 Post Consultant Open 9,000.00 0.00 Canceled 2019-06-20 2019-08-08 2019-08-29 2019-10-03 2020-03-31 10 voitures, un poste Coordination Selection d'hébergement (des compteurs et du groupe électrogène) et aménagement de la cour 61 / Élaboration des textes Component 2: Strengthening Individual d'application de la loi sur le IDA / D2860 the Policy and Institutional Post Consultant Open 20,000.00 22,801.19 Signed 2019-06-20 2019-06-07 2019-08-08 2020-12-18 2019-08-29 2021-01-04 2019-10-03 2021-04-23 2020-03-31 littoral Framework Selection Individual 53 / Recrutement d'un (01) Component 4: National IDA / D2860 Post Consultant Open 3,500.00 4,603.46 Signed 2019-06-26 2019-08-21 2019-08-14 2020-05-13 2019-09-04 2020-09-03 2019-10-09 2020-09-21 2020-04-06 coursier Coordination Selection 55 / Recrutement de deux (2) Individual Component 4: National chauffeurs de permis IDA / D2860 Post Consultant Open 9,000.00 20,845.12 Signed 2019-07-12 2019-08-21 2019-08-30 2020-06-02 2019-09-20 2020-07-15 2019-10-25 2020-09-21 2020-04-22 Coordination catégorie B Selection 54 / Recrutement d'un (01) Individual Component 4: National chauffeur de permis catégorie IDA / D2860 Post Consultant Open 5,500.00 0.00 Canceled 2019-08-22 2019-08-21 2019-10-10 2019-10-31 2019-12-05 2020-06-02 Coordination C Selection 75 / Recrutement d'un Individual Component 4: National Coordonnateur du projet IDA / D2860 Post Consultant Open 33,000.00 40,385.61 Signed 2019-08-19 2019-08-20 2019-10-07 2020-03-04 2019-10-28 2020-03-11 2019-12-02 2020-05-26 2020-05-30 Coordination WACA ResIP Selection 75BIS / Recrutement de Individual Component 4: National coordonnateur pour le projet IDA / D2860 Post Consultant Open 33,000.00 40,486.37 Signed 2019-11-20 2019-11-08 2019-12-23 2020-03-13 2020-01-06 2020-03-25 2020-02-10 2020-05-26 2020-08-08 Coordination WACA ResIP Selection 87 / Recrutement de consultant individuel génie electro-mécanique pour le Component 2: Strengthening Individual Pending contrôles des travaux TF / A7130 the Policy and Institutional Post Consultant Open 18,182.00 0.00 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 Implementation d'aménagement de la cour du Framework Selection MEDDPN et des bureaux de l'UGP (RDC et R+1) 91 / Recrutement d'un Individual Component 4: National Pending secrétaire administratif pour IDA / D2860 Post Consultant Open 12,000.00 0.00 2020-04-09 2020-05-28 2020-06-18 2020-07-23 2021-01-19 Coordination Implementation l'UGP WACAResIP Selection 89 / Recrutement de consultant individuel environnementaliste pour le Component 2: Strengthening Individual contrôles des travaux TF / A7130 the Policy and Institutional Post Consultant Open 11,136.00 0.00 Canceled 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 d'aménagement de la cour du Framework Selection MEDDPN et des bureaux de l'UGP (RDC et R+1) 20 / Recrutement d'un Individual Component 4: National spécialiste en développement IDA / V1150 Post Consultant Open 24,000.00 0.00 Canceled 2018-06-03 2018-07-22 2019-06-25 2018-08-12 2019-08-19 2018-09-16 2019-03-15 Coordination institutionnel Selection Page 6 106 / Recrutement d'un consultant pour la réalisation de l'EIES du projet d'assainissement des eaux Component 3: Strengthening Individual usées à la plage de Lomé, Under IDA / D2860 National Physical and Social Post Consultant Open 50,000.00 0.00 2020-06-02 2020-11-11 2020-07-21 2020-08-11 2020-09-15 2021-01-15 réhabilitation du réseau Implementation Investments Selection embryonnaire d'assainissement collectif des eaux usées de la ville de Lomé- Togo 111 / Recrutement d'un Individual Component 4: National expert en passation de IDA / D2860 Post Consultant Open 28,500.00 34,987.56 Signed 2020-05-29 2020-05-25 2020-07-17 2020-07-23 2020-08-07 2020-10-02 2020-09-11 2020-11-20 2021-09-10 Coordination marché pour le projet WACA Selection ResIP 115 / Recrutement d'un Individual Component 4: National auditeur interne pour le projet IDA / D2860 Post Consultant Open 17,455.00 0.00 Canceled 2020-06-03 2020-07-22 2020-08-12 2020-09-16 2021-11-30 Coordination WACA ResIP Selection 101 / Recrutement de consultant individuel génie électromécanique pour le Component 2: Strengthening Individual contrôle des travaux IDA / D2860 the Policy and Institutional Post Consultant Open 6,200.00 15,039.77 Signed 2020-07-10 2020-06-16 2020-08-28 2020-09-23 2020-09-18 2021-03-24 2020-10-23 2021-04-23 2021-06-23 d'aménagement du cadre de Framework Selection travail de l'ANGE et du bâtiment R+1 de l'UGP WACA ResiP 90 / Recrutement d’un secrétaire pour la passation Individual Component 4: National Under de marché et la gestion IDA / D2860 Post Consultant Open 12,000.00 0.00 2020-06-30 2020-08-11 2020-08-18 2020-09-08 2020-10-13 2021-04-11 Coordination Implementation financière du projet WACA Selection ResIP 117 / Recrutement d'un Individual Component 4: National spécialiste en communication IDA / D2860 Post Consultant Open 24,000.00 0.00 Canceled 2020-08-12 2020-09-30 2020-10-21 2020-11-25 2021-11-24 Coordination pour le projet WACA ResIP Selection 122 / Mise en place d'un système automatisé de Component 2: Strengthening Individual Under gestion des ressources TF / A7130 the Policy and Institutional Post Consultant Open 15,000.00 0.00 2020-09-30 2021-03-29 2020-11-18 2020-12-09 2021-01-13 2021-04-12 Implementation humaines et financières du Framework Selection MEDDPN TG-WACA TOGO-204714-CS- Component 3: Strengthening Individual INDV / élaboration d'un plan Under TF / A7130 National Physical and Social Post Consultant Limited 20,000.00 0.00 2021-01-28 2020-12-30 2021-02-12 2021-03-05 2021-04-09 2021-05-09 d'aménagement et de gestion Implementation Investments Selection de la forêt classée d'Assévé 99 / Recrutement d'un consultant pour la réalisation Component 3: Strengthening Individual d'un plan d'action de IDA / D2860 National Physical and Social Post Consultant Open 22,000.00 0.00 Canceled 2020-04-10 2020-05-29 2020-06-19 2020-07-24 2021-01-20 réinstallation du dragage et Investments Selection stabilisation des berges de la lagune et du lac Togo 95 / Recrutement d'un consultant pour la realisation Component 3: Strengthening Individual d'un plan d'action de TF / A7130 National Physical and Social Post Consultant Open 9,091.00 0.00 Canceled 2020-04-09 2020-04-14 2020-05-28 2020-06-18 2020-07-23 2021-01-19 réinstallation du complexe Investments Selection d'aires protégées de TOGODO 102 / Recrutement de consultant individuel Component 2: Strengthening Individual environnementaliste pour le IDA / D2860 the Policy and Institutional Post Consultant Open 2,727.00 0.00 Canceled 2020-04-09 2020-05-28 2020-06-18 2020-07-23 2021-01-19 contrôle des travaux Framework Selection d'aménagement du cadre de travail de l'ANGE 94 / Recrutement de consultant individuel génie Component 2: Strengthening Individual civil pour le contrôle des IDA / D2860 the Policy and Institutional Post Consultant Open 4,136.00 0.00 Canceled 2020-06-30 2020-08-18 2020-09-08 2020-10-13 2021-05-12 travaux Framework Selection d'aménagement du cadre de travail de l'ANGE 86 / Recrutement de consultant individuel génie Component 2: Strengthening Individual civil pour le contrôles des TF / A7130 the Policy and Institutional Post Consultant Open 18,182.00 0.00 Canceled 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 travaux d'aménagement de la Framework Selection cour du MEDDPN et des bureaux de l'UGP (RDC et R+1) 80 / Etude d'impact Component 3: Strengthening Individual environnementale et sociale TF / A7130 National Physical and Social Post Consultant Open 18,182.00 0.00 Canceled 2020-03-19 2020-03-30 2020-05-07 2020-05-28 2020-07-02 2020-12-29 du complexe d'aires Investments Selection protégées de TOGODO TG-WACA TOGO-222416-CS- Component 2: Strengthening Individual INDV / Etude pour la mise en Pending IDA / D2860 the Policy and Institutional Post Consultant Open 30,000.00 0.00 2021-06-08 2021-07-28 2021-08-18 2021-09-22 2021-10-22 place du MRV de la zone Implementation Framework Selection côtière TG-WACA TOGO-222909-CS- Individual Component 4: National Under INDV / Elaboration du rapport IDA / D2860 Post Consultant Open 46,000.00 0.00 2021-04-15 2021-03-29 2021-06-03 2021-06-24 2021-07-29 2021-08-28 Coordination Implementation d'évaluation à mi-parcours Selection TG-WACA TOGO-223541-CS- INDV / Actualisation du Plan Component 2: Strengthening Individual d'investissement Pending IDA / D2860 the Policy and Institutional Post Consultant Open 27,273.00 0.00 2021-05-28 2021-07-16 2021-08-06 2021-09-10 2022-03-09 multisectoriel pour prendre Implementation Framework Selection en compte les considérations environnementales régionales TG-WACA TOGO-222896-CS- Individual INDV / SELECTION D’UN Component 4: National Pending IDA / D2860 Post Consultant Open 38,000.00 0.00 2021-06-18 2021-08-06 2021-08-27 2021-10-01 2022-10-01 EXPERT OCEANOGRAPHE – Coordination Implementation Selection LITTORALISTE TG-WACA TOGO-222891-CS- Component 2: Strengthening Individual INDV / Elaboration du plan IDA / D2860 the Policy and Institutional Post Consultant Open 32,000.00 0.00 Canceled 2021-05-20 2021-07-08 2021-07-29 2021-09-02 2021-10-02 spatial marin et côtier Framework Selection Page 7 Component 2: Strengthening Individual 51 / Appui à la mise en place IDA / D2860 the Policy and Institutional Post Consultant Open 30,000.00 0.00 Canceled 2019-02-04 2019-06-05 2019-03-25 2019-04-15 2019-05-20 2019-11-16 du MRV de la zone côtière Framework Selection Page 8 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan[Original: December 2015]: Last Revision of Updated Procurement Plan, Feb 2017] 2. Date of General Procurement Notice: June 25, 2015 3. Period covered by this procurement plan: From December 2015 Till end of December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. NCB (Goods) Above US$ 1,500,000 All 2. Shopping (Goods) Above US$ 500,000 All 2. Pre-qualification. "Not Applicable" 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: "Not applicable" 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan # 8496-EG, Project # P145699 prepared by SSSNP PMU on 6th May 2015 5. Any Other Special Procurement Arrangements: None May 24, 2017 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) (yes/ no) Supply of Computers , laptops, software and other IT 400,00 NCB G-05 equipment 1 No Post 0 (Goods) for MOSS Departmen ts in27 Governorat es Printing & Shoppi G-07 Publication 50,000 1 No Post ng s (Goods) Furniture Shoppi & G-08 Equipment 50,000 1 No Post ng for the (Goods) PMU Video & Shoppi Graphics G-09 equipment 4,000 1 No Post ng for MOSS (Goods) Customer Collaborati on Solution Shoppi G-11 for 45,000 1 No Post ng Grievance (Goods) (call center) III. Selection of Consultants May 24, 2017 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. QCBS (Consulting Firms) Above US$ 500,000 2. IC (Individual Consultant) Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimat Packa Review Comment Assignment ed ges by Bank s Cost (Prior / US$ Post) CF-05 Institutional consultancy to conduct 120,00 airing 1 Post QCBS 0 adverstismen t+Video + radio CF-06 Local community dialogues 50,000 1 Post QCBS regular administratio n CF-08 Communicati on Firm (Advocacy Strategy, 150,00 Communicati 1 Post QCBS 0 on Strategy, Design materials, etc) CF-09 Technical/the 75,000 1 Post QCBS May 24, 2017 matic capacity building (M&E, MIS, grievance, conditionality , social responsibility , NGOs TOT, etc.) IC-30 Hiring Office Manager for 30,000 1 Post IC the Program May 24, 2017 PROCUREMENT Egypt, Arab Republic of : Strengthening Social Safety Net Project PLAN General Information Country: Egypt, Arab Republic of Bank’s Approval Date of the Original Procurement Plan: 2017-05-31 2021-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145699 GPN Date: Project Name: Strengthening Social Safety Net Project Loan / Credit No: IBRD / 84960, IBRD / 89970 Ministry of Social Solidarity Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOSS-11483-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 50,000.00 2,241.79 Completed 2017-07-06 2017-05-05 2017-08-31 2017-05-14 2018-02-27 2017-05-25 Printing and Publications Operational Systems Quotations Envelope EG-MOSS-11486-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Furniture and Equipment for IBRD / 84960 Post Limited 50,000.00 6,323.62 Completed 2017-08-06 2017-07-19 2017-10-01 2017-07-26 2018-03-30 2017-07-29 Operational Systems Quotations Envelope the PMU EG-MOSS-11489-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Video & Graphics Equipment IBRD / 84960 Post Limited 4,000.00 0.00 Canceled 2017-07-07 2017-09-01 2018-02-28 Operational Systems Quotations Envelope for MOSS EG-MOSS-17356-GO-RFQ / Customer Collaboration Solution (grievance) . This solution combines traditional contact center technology and Project Management and Request for Single Stage - One processes with important IBRD / 84960 Post Limited 45,000.00 0.00 Canceled 2017-07-02 2017-07-23 2018-01-19 Monitoring and Evaluation Quotations Envelope additions in recording, agent workspaces, social media and video to help build deeper relationships with our customers EG-MOSS-18410-GO-RFQ / we want to procure 330 scanner so that the grievance system can work through the Moss units in the Project Management and Request for Single Stage - One governorates and no need for IBRD / 84960 Post Limited 70,000.00 0.00 Canceled 2017-07-06 2017-07-04 2017-08-31 2018-02-27 Monitoring and Evaluation Quotations Envelope the appellant to come to the ministry in Cairo, as the appellant usually submit documents with his complaint so we have to scan EG-MOSS-21361-GO-RFQ / Project Management and Request for Single Stage - One Communication equipment's IBRD / 84960 Post Limited 1,500.00 952.01 Completed 2017-08-08 2017-07-30 2017-10-03 2017-08-03 2018-04-01 2017-08-06 Monitoring and Evaluation Quotations Envelope for PMU staff EG-MOSS-23406-GO-RFQ / Under Project Management and Request for Single Stage - One Procuring Tablets for Social IBRD / 84960 Post Limited 95,000.00 49,070.63 Implementati 2017-09-05 2017-08-14 2017-10-31 2017-09-07 2018-04-29 2017-09-14 Monitoring and Evaluation Quotations Envelope Administration on EG-MOSS-23414-GO-RFQ / Project Management and Request for Single Stage - One Procuring Chargers for IBRD / 84960 Post Limited 5,000.00 7,447.63 Completed 2017-08-18 2017-08-21 2017-10-13 2017-09-13 2018-04-11 2017-11-06 Monitoring and Evaluation Quotations Envelope existing tablets EG-MOSS-23481-GO-RFQ / Project Management and Request for Single Stage - One Procuring Office Machinery for IBRD / 84960 Post Limited 1,000.00 0.00 Canceled 2017-09-08 2017-11-03 2018-05-02 Monitoring and Evaluation Quotations Envelope the PMU EG-MOSS-25146-GO-RFQ / Under Designing and Printing of the Project Management and Request for Single Stage - One IBRD / 84960 Post Limited 100,000.00 0.00 Implementati 2017-10-06 2017-08-29 2017-12-01 2018-05-30 Ministry of Social Solidarity Monitoring and Evaluation Quotations Envelope on (MOSS) Promotional Materials EG-MOSS-25158-GO-RFQ / Project Management and Request for Single Stage - One printing business cards for IBRD / 84960 Post Limited 1,200.00 0.00 Canceled 2017-11-06 2018-01-01 2018-06-30 Monitoring and Evaluation Quotations Envelope the PMU EG-MOSS-25161-GO-RFQ / Under Project Management and Request for Single Stage - One Procuring computers for IBRD / 84960 Post Limited 6,000.00 0.00 Implementati 2017-11-06 2017-09-11 2018-01-01 2018-06-30 Monitoring and Evaluation Quotations Envelope Service improvement unit on EG-MOSS-34988-GO-RFQ / Project Management and Request for Single Stage - One Printing 1,500,000 Takaful & IBRD / 84960 Post Limited 45,000.00 7,635.01 Signed 2018-01-06 2017-11-12 2018-03-03 2018-12-28 2018-08-30 Monitoring and Evaluation Quotations Envelope Karama application EG-MOSS-54103-GO-RFQ / Shopping purchase: 5 laptops, 2 PCs, 5 flash memories, 5 Project Management and Request for Single Stage - One antivirus, 4 external hard IBRD / 84960 Post Limited 7,000.00 0.00 Canceled 2018-03-18 2018-04-15 2018-05-06 Monitoring and Evaluation Quotations Envelope disks, 1 camera stand, 1 hand microphone, 1 ear microphones, EG-MOSS-60796-GO-RFQ / Purchase of IT equipment for Under extended PMU staff (10 Project Management and Request for Single Stage - One IBRD / 84960 Post Limited 6,000.00 0.00 Implementati 2018-04-30 2018-05-28 2018-06-25 2018-12-22 laptops + 10 antivirus + 10 Monitoring and Evaluation Quotations Envelope on electricity connector extensions + 5 modems) Page 1 EG-MOSS-68986-GO-RFQ / Professional Conference call, sound system, projectors, Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 50,000.00 28,642.28 Completed 2018-07-29 2018-08-05 2018-08-12 2018-08-29 2018-09-21 2018-09-06 screens and TVs for the Operational Systems Quotations Envelope meeting halls in the ministry (MoSS) head quarter EG-MOSS-70745-GO-RFQ / Purchase 10 photocopier, 20 Support SSN Targeting and Request for Single Stage - One photocopier toners , 65 IBRD / 84960 Post Limited 30,000.00 0.00 Canceled 2018-08-01 2018-08-20 2018-09-19 Operational Systems Quotations Envelope printer toners and 5 inkjet printer. EG-MOSS-66112-GO-RFQ / Purchase Air conditioning, Project Management and Request for Single Stage - One Kitchen electrical devices, IBRD / 84960 Post Limited 15,000.00 4,158.42 Signed 2018-06-23 2018-07-11 2018-07-23 2018-07-30 2018-08-22 Monitoring and Evaluation Quotations Envelope ceiling fans and water cooler tank EG-MOSS-70746-GO-RFQ / Purchase of metal units for Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 40,000.00 316,654.86 Signed 2018-07-29 2018-08-28 2018-09-23 2018-09-10 2018-12-22 2018-09-28 filing - Office furniture - Operational Systems Quotations Envelope Curtains for PMU office. EG-MOSS-71078-GO-RFQ / Purchasing: Printing paper Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 15,000.00 13,499.54 Completed 2018-08-10 2018-09-06 2018-10-05 2018-09-18 2019-04-03 2018-10-16 size (A4 & A3) and stationary Operational Systems Quotations Envelope (e.g: pen, folders ..etc) EG-MOSS-76938-GO-RFQ / Purchasing Racks for the PMU's equipments: Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 4,500.00 0.00 Canceled 2018-09-15 2018-10-11 2018-11-10 1- The main routers in MoSS Operational Systems Quotations Envelope 2- Equipment for discussion systems in MoSS EG-MOSS-78331-GO-RFQ / Providing Compact Stand Kiosk for some social units. Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 60,000.00 29,280.82 Signed 2018-09-25 2018-11-01 2018-11-20 2018-12-20 2019-03-20 Each kiosk will include a tablet Operational Systems Quotations Envelope to receive information from T&K beneficiaries. EG-MOSS-71077-GO-RFQ / Printing T&K's logo on block- Under Support SSN Targeting and Request for Single Stage - One notes, personal cards, pen, IBRD / 84960 Post Limited 90,000.00 0.00 Implementati 2018-07-31 2018-10-23 2018-09-25 2018-11-24 Operational Systems Quotations Envelope bags, paper folders ..etc. on Printing Broshers, pock-let EG-MOSS-81693-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Purchase 2650 electricity IBRD / 84960 Post Limited 80,000.00 0.00 Canceled 2018-11-23 2019-01-02 2019-04-02 Operational Systems Quotations Envelope connectors EG-MOSS-85351-GO-RFQ / Under Purchase web application to Project Management and Request for Single Stage - One IBRD / 84960 Post Limited 90,000.00 0.00 Implementati 2018-11-16 2018-11-18 2018-12-21 2019-03-21 manage TKP depository as Monitoring and Evaluation Quotations Envelope on CMS & LMS. EG-MOSS-85354-GO-RFQ / Project Management and Request for Single Stage - One Purchase network cable & IBRD / 84960 Post Limited 3,000.00 0.00 Canceled 2018-11-13 2018-12-15 2019-01-14 Monitoring and Evaluation Quotations Envelope Mobile phones EG-MOSS-81695-GO-RFB / Lot(A) Supply & install 5100 Thin-clients in social units (Lot B) Supply (1,300) LaserJet Printers Support SSN Targeting and Single Stage - One (Lot C) Supply (2,300) IBRD / 84960 Prior Request for Bids Open - International 7,000,000.00 3,537,297.47 Signed 2018-12-12 2018-12-27 2018-12-20 2019-06-18 2019-02-03 2019-03-03 2019-02-17 2019-06-20 2019-03-10 2019-07-11 2019-07-08 Operational Systems Envelope Scanners (Lot D) Supply (2,650) IP Phones (Lot E) Supply 500 LaserJet Toners for existing printers EG-MOSS-81682-GO-RFQ / Purchase Telephone devices, Support SSN Targeting and Request for Single Stage - One Fax devices, IP-Phones & IBRD / 84960 Post Limited 15,000.00 6,998.58 Completed 2018-10-15 2018-10-16 2018-10-26 2018-10-21 2018-11-25 2018-10-23 Operational Systems Quotations Envelope licenses for IP-Phones for the PIU EG-MOSS-130517-GO-RFQ / Supply and install of networking infrastructure for Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 90,000.00 73,736.13 Signed 2019-09-10 2019-07-24 2019-11-05 2019-08-19 2020-05-03 200 rehabilitation offices of Operational Systems Quotations Envelope the Ministry of Social Solidarity offices. EG-MOSS-132894-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Printings of the Conditionality IBRD / 84960 Post Limited 35,000.00 25,787.70 Completed 2019-09-10 2019-05-23 2019-11-05 2019-05-30 2020-05-03 2019-06-02 Operational Systems Quotations Envelope Registries EG-MOSS-135529-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 10,000.00 6,026.97 Signed 2019-09-29 2019-08-04 2019-11-24 2019-09-15 2020-05-22 Toner cartridges Operational Systems Quotations Envelope EG-MOSS-135562-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Printing Takaful and Karama IBRD / 84960 Post Limited 15,000.00 14,524.10 Signed 2019-09-29 2019-07-15 2019-11-24 2019-08-04 2020-05-22 Operational Systems Quotations Envelope questionnaire . EG-MOSS-121002-GO-RFB / Project Management and Single Stage - One Conditionality Registers and IBRD / 84960 Post Request for Bids Open - National 200,000.00 128,671.06 Completed 2019-06-30 2019-07-02 2019-07-05 2019-08-16 2019-07-10 2019-09-15 2019-07-21 2019-10-20 2019-09-15 2020-04-17 2019-10-01 Monitoring and Evaluation Envelope Booklets BULK Printing EG-MOSS-133550-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 1,000.00 807.30 Completed 2019-09-14 2019-07-21 2019-11-09 2019-07-25 2020-05-07 2019-07-29 Conditionality training guide Operational Systems Quotations Envelope EG-MOSS-144416-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Network Fault & performance IBRD / 84960 Post Limited 90,000.00 90,905.31 Signed 2019-11-12 2019-11-21 2020-01-07 2019-12-19 2020-07-05 Operational Systems Quotations Envelope management system Page 2 EG-MOSS-147022-GO-RFB / Supply of networking switches Support SSN Targeting and Single Stage - One IBRD / 84960 Post Request for Bids Open - National 340,000.00 308,079.66 Signed 2019-12-20 2020-01-19 2019-12-25 2020-02-05 2020-02-16 2020-03-06 2020-04-02 2020-04-10 2020-04-15 2020-10-07 for 344 administrations and Operational Systems Envelope directorates of the MoSS EG-MOSS-35566-GO-RFB / Project Management and Single Stage - One Automation of MOSS social IBRD / 84960 Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2017-11-16 2017-11-21 2018-01-02 2018-02-01 2018-03-08 2018-09-04 Monitoring and Evaluation Envelope units, procuring 4500 tablet EG-MOSS-151897-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Printings of Job evaluation IBRD / 84960 Post Limited 94,000.00 0.00 Canceled 2019-12-31 2020-06-02 2020-02-25 2020-08-23 Operational Systems Quotations Envelope forms EG-MOSS-154634-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 45,000.00 19,377.06 Completed 2020-01-25 2019-12-09 2020-03-21 2020-02-19 2020-09-17 2020-03-01 stationery and office supplies Operational Systems Quotations Envelope EG-MOSS-163926-GO-RFQ / Furniture and air condition for Support SSN Targeting and Request for IBRD / 84960 Post 5,000.00 720.63 Completed 2020-03-10 2020-03-10 2020-03-29 2020-03-10 2020-04-12 Takaful and Karama program Operational Systems Quotations director’s office EG-MOSS-165397-GO-RFQ / Supply and install of flexible anti-fire ducts, network Support SSN Targeting and Request for Single Stage - One cables, electricity power exit IBRD / 84960 Post Limited 9,000.00 0.00 Canceled 2020-03-27 2020-05-22 2020-11-18 Operational Systems Quotations Envelope duct socket for rack, face plates to construct fifty (50) network nodes. EG-MOSS-154659-GO-RFQ / The objective of this procurement activity is to purchase disability Support SSN Targeting and Request for Single Stage - One assessment kits. Some of IBRD / 84960 Post Limited 37,000.00 50,811.43 Completed 2020-01-25 2020-02-09 2020-03-21 2020-02-27 2020-09-17 2020-03-01 Operational Systems Quotations Envelope items that the kits contain are alphabet wooden board, coins, group of cubes, scissors, .. etc. EG-MOSS-165406-GO-RFQ / This activity is to purchase queue system, furniture for the grievance room, supply and install both electricity and Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 95,000.00 117,830.96 Completed 2020-03-28 2020-04-22 2020-05-23 2020-05-10 2020-11-19 2020-07-17 data cables for the queue Operational Systems Quotations Envelope system, and supply and install a partition for the waiting area annexed to the grievance room. Complete lot. EG-MOSS-172044-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 100,000.00 90,000.00 Terminated 2020-05-11 2020-05-07 2020-07-06 2020-05-11 2021-01-02 Database replication server Operational Systems Quotations Envelope EG-MOSS-173387-GO-RFQ / Masks, gloves, alcohol, and Support SSN Targeting and Request for Single Stage - One sterilization materials against IBRD / 84960 Post Limited 9,000.00 10,985.56 Completed 2020-05-22 2020-05-10 2020-07-17 2020-06-17 2021-01-13 2020-06-21 Operational Systems Quotations Envelope Corona Virus for the team work. EG-MOSS-180023-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Laptop computers and IBRD / 84960 Post Limited 50,000.00 25,643.84 Completed 2020-06-30 2020-06-17 2020-08-25 2020-06-22 2021-02-21 2020-06-25 Operational Systems Quotations Envelope photocopiers EG-MOSS-191265-GO-RFQ / Network passive components such as Rj45 Cat6, crimper, Support SSN Targeting and Request for Single Stage - One tester, Box-UTP-Cat6 -305M, IBRD / 84960 Post Limited 13,000.00 6,973.06 Signed 2020-09-11 2020-09-06 2020-11-06 2020-09-24 2021-05-05 Operational Systems Quotations Envelope and unmanaged switch 8 port, for the social administrations’ network. EG-MOSS-191257-GO-RFQ / Furnishing the Information Center of Takaful and Karama Program with chairs, desks, Support SSN Targeting and Request for Single Stage - One smart screen, uniform and ID IBRD / 84960 Post Limited 19,000.00 15,863.49 Signed 2020-09-11 2020-08-16 2020-11-06 2020-09-03 2021-05-05 Operational Systems Quotations Envelope cards for the receptionist team, internal signage, lighting units, data cabling, … etc. EG-MOSS-197489-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Six access control doors IBRD / 84960 Post Limited 10,000.00 7,958.74 Signed 2020-11-03 2020-10-11 2020-12-29 2020-11-02 2021-06-27 Operational Systems Quotations Envelope system. EG-MOSS-197499-GO-RFQ / Number of twenty laptop Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 25,000.00 17,455.36 Completed 2020-11-10 2020-10-12 2021-01-05 2020-10-13 2021-07-04 2020-10-18 computers for Takaful and Operational Systems Quotations Envelope Karama. EG-MOSS-203695-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Supplying Tablets for the IBRD / 84960 Post Limited 100,000.00 94,736.84 Completed 2020-11-17 2021-02-01 2021-01-12 2021-03-30 2021-07-11 2021-04-05 Operational Systems Quotations Envelope social unit. EG-MOSS-204563-GO-RFQ / Pending Support SSN Targeting and Request for Single Stage - One Supply and install air- IBRD / 84960 Post Limited 20,000.00 0.00 Implementati 2020-11-22 2021-01-17 2021-07-16 Operational Systems Quotations Envelope conditions. on EG-MOSS-210972-GO-RFB / Sheets for medical beds for Support SSN Targeting and Single Stage - One the isolation hospitals to IBRD / 84960 Post Request for Bids Open - National 950,000.00 0.00 Canceled 2020-12-27 2021-01-01 2021-02-12 2021-03-14 2021-04-18 2021-10-15 Operational Systems Envelope confront the Corona pandemic. EG-MOSS-211213-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Video conference system for IBRD / 84960 Post Limited 44,000.00 31,814.99 Completed 2021-01-05 2020-12-20 2021-03-02 2020-12-30 2021-08-29 2021-01-03 Operational Systems Quotations Envelope H.E. office. EG-MOSS-211220-GO-RFQ / Under UTP-Cat6 cables and power Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 40,000.00 34,034.42 Implementati 2021-01-04 2021-01-04 2021-03-01 2021-08-28 distribution units PDUs for the Operational Systems Quotations Envelope on social units Page 3 EG-MOSS-212365-GO-RFQ / Purchasing twenty laptops Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 30,000.00 16,332.91 Signed 2021-01-11 2021-01-04 2021-03-08 2021-01-18 2021-09-04 and upgrading four HP Operational Systems Quotations Envelope ProBook 450 G6 laptops. EG-MOSS-225239-GO-RFQ / As a result of the outbreak of the new Corona virus (Covid- 19), cleaning supplies, Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 100,000.00 107,747.45 Completed 2021-03-26 2021-03-24 2021-05-21 2021-04-11 2021-11-17 2021-05-09 disinfectants and masks will Operational Systems Quotations Envelope be provided to a number of 135,000 participants in the behavior change sessions. EG-MOSS-225739-GO-RFQ / Pending Audiovisual equipment for the Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 95,000.00 0.00 Implementati 2021-04-02 2021-05-28 2021-11-24 main conference room of the Operational Systems Quotations Envelope on MoSS. EG-MOSS-229514-GO-RFB / Pending Supplying a number of (3,000) Support SSN Targeting and Single Stage - One IBRD / 84960 Post Request for Bids Open - National 940,000.00 0.00 Implementati 2021-04-22 2021-04-27 2021-06-08 2021-07-08 2021-08-12 2022-02-08 Tablet computer for the social Operational Systems Envelope on unit. EG-MOSS-197481-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Printing registration forms for IBRD / 84960 Post Limited 50,000.00 0.00 Canceled 2020-11-03 2020-12-29 2021-06-27 Operational Systems Quotations Envelope Takaful and Karama NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOSS-52515-NC-DIR / MoSS Social Units SDSL land Support SSN Targeting and IBRD / 84960 Prior Direct Selection Direct 2,000,000.00 1,825,150.37 Signed 2018-03-07 2018-03-12 2018-04-16 2018-07-10 2018-10-13 lines connectivity service Operational Systems provision EG-MOSS-76934-NC-RFQ / Printing 2 million Support SSN Targeting and Request for Single Stage - One questionnaire of IBRD / 84960 Post Limited 27,500.00 27,140.36 Signed 2018-09-14 2018-09-10 2018-09-30 2018-09-18 2018-10-20 Operational Systems Quotations Envelope conditionality under Takaful component EG-MOSS-121629-NC-DIR / eFinance's design and printing Support SSN Targeting and IBRD / 84960 Prior Direct Selection Direct 800,000.00 0.00 Canceled 2019-06-30 2019-07-05 2019-08-09 2020-02-05 of 500,000 integrated Operational Systems services acquisition disability cards EG-MOSS-143574-NC-DIR / Support SSN Targeting and IBRD / 84960 Post Direct Selection Direct 2,300.00 0.00 Canceled 2019-10-30 2019-11-04 2019-12-09 2020-06-06 Office boy Operational Systems EG-MOSS-143576-NC-DIR / Support SSN Targeting and IBRD / 84960 Post Direct Selection Direct 3,000.00 0.00 Canceled 2019-10-30 2019-11-04 2019-12-09 2020-06-06 Office boy Operational Systems EG-MOSS-40100-NC-DIR / Video shooting, due to satisfactory performance of a supplier that was selected Project Management and through shopping package, IBRD / 84960 Post Direct Selection Direct 2,500.00 0.00 Canceled 2017-12-31 2018-01-05 2018-02-09 2018-08-08 Monitoring and Evaluation we want to make a short documentary about Karama's system before and after the reform we had made EG-MOSS-85355-NC-RFQ / Project Management and Request for Single Stage - One Maintenance Service for PIU's IBRD / 84960 Post Limited 2,500.00 0.00 Canceled 2018-11-16 2018-12-16 2019-11-30 Monitoring and Evaluation Quotations Envelope air conditions EG-MOSS-73859-NC-RFQ / Support SSN Targeting and Request for Single Stage - One Providing production services IBRD / 84960 Post Limited 50,000.00 0.00 Canceled 2018-08-19 2018-09-28 2019-08-01 Operational Systems Quotations Envelope for short films/movies. EG-MOSS-78329-NC-DIR / Support SSN Targeting and Providing MoSS's PIU with PRI IBRD / 84960 Post Direct Selection Direct 10,000.00 0.00 Canceled 2018-09-18 2018-09-23 2018-10-28 2019-11-30 Operational Systems service EG-MOSS-34835-NC-RFQ / Developing Video Disc (15 minutes) of the conditionality Project Management and IBRD / 84960 Post Direct Selection Direct 5,000.00 0.00 Canceled 2017-12-03 2017-12-08 2018-01-12 2018-07-11 process for insliting potential Monitoring and Evaluation beneficiaries into and out of the program EG-MOSS-225309-NC-RFQ / The non-consulting service required is having short mobile messages sent via operator networks, with Support SSN Targeting and Request for Single Stage - One associated cost for each SMS IBRD / 84960 Post Limited 100,000.00 50,495.36 Signed 2021-03-26 2021-03-01 2021-05-21 2021-04-06 2021-11-17 Operational Systems Quotations Envelope passing through operator network. No technical consultation or expertise is requested, only using operator infrastructure. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOSS-11508-CS-QCBS / Communication Firm Support SSN Targeting and Quality And Cost- Under (Advocacy Strategy, IBRD / 84960 Post Open - National 150,000.00 0.00 2017-12-03 2017-08-15 2017-12-24 2018-02-06 2017-11-13 2018-03-06 2018-04-05 2018-05-10 2018-06-14 2019-06-14 Operational Systems Based Selection Implementation Communication Strategy, Design Materials etc.) Page 4 EG-MOSS-24306-CS-QCBS / Awareness campaign on "Rights of People with Project Management and Quality And Cost- IBRD / 84960 Post Open - National 230,000.00 256,593.35 Signed 2017-10-01 2017-08-20 2017-10-22 2017-12-05 2017-11-10 2018-01-02 2017-12-28 2018-02-01 2018-01-28 2018-03-08 2018-02-19 2018-04-12 2018-11-04 2019-04-12 Disability" (PwD) Monitoring and Evaluation Based Selection In Social Protection and Inclusion EG-MOSS-11506-CS-QCBS / Consultant Project Management and Local Community Dialogues IBRD / 84960 Post Qualification Open - National 50,000.00 0.00 Canceled 2017-11-01 2017-11-22 2018-01-05 2018-02-02 2018-03-04 2018-04-08 2018-05-13 2019-05-13 Monitoring and Evaluation Regular Administration Selection EG-MOSS-11503-CS-QCBS / Institutional Consultancy to Support SSN Targeting and Quality And Cost- IBRD / 84960 Post Open - National 120,000.00 0.00 Canceled 2017-09-03 2017-09-24 2017-11-07 2017-12-05 2018-01-04 2018-02-08 2018-03-15 2019-03-15 conduct Airing, Operational Systems Based Selection Advertisement, Video, Radio EG-MOSS-46782-CS-QCBS / Institutional capacity building Project Management and Quality And Cost- campaign for building IBRD / 84960 Post Open - National 80,000.00 0.00 Canceled 2018-01-30 2018-02-20 2018-07-08 2018-04-05 2018-05-03 2018-06-02 2018-07-07 2018-08-11 2019-08-11 Monitoring and Evaluation Based Selection capacities on "Takaful" conditionality EG-MOSS-11509-CS-QCBS / Technical / Thematic capacity Support SSN Targeting and Quality And Cost- building (M&E, MIS, Grievance, IBRD / 84960 Post Open - National 75,000.00 0.00 Canceled 2018-01-01 2018-01-22 2018-03-07 2018-04-04 2018-05-04 2018-06-08 2018-07-13 2019-07-13 Operational Systems Based Selection Conditionality, Social responsibility, NGOs TOT, etc) EG-MOSS-165374-CS-CQS / Conducting a Rapid Market Consultant Support SSN Targeting and Assessment for the “FORSA” IBRD / 89970 Post Qualification Open - National 6,500.00 0.00 Canceled 2020-03-24 2020-03-23 2020-04-14 2020-05-28 2020-06-27 2020-08-01 2021-01-28 Operational Systems Economic Empowerment Selection Program in Egypt EG-MOSS-165280-CS-CQS / Capacity building and training for the Master Trainers, a Consultant trainer for each governorate, Support SSN Targeting and IBRD / 89970 Post Qualification Open - National 60,000.00 163,307.79 Signed 2020-03-19 2020-03-29 2020-04-09 2020-05-08 2020-05-23 2020-10-12 2020-06-20 2021-01-03 2020-07-11 2021-01-03 2020-08-15 2021-01-03 2020-09-19 2021-03-08 2021-04-22 who will accordingly train the Operational Systems Selection targeted T&K enrolled candidates in each governorate. EG-MOSS-177408-CS-CQS / Performance Audit. The objective of the performance audit of the Eligible Expenditure Program (EEP) is Consultant Support SSN Targeting and to ascertain whether IBRD / 84960 Post Qualification Open - National 40,000.00 29,439.72 Signed 2020-06-02 2020-05-03 2020-06-23 2020-08-06 2020-05-10 2020-09-05 2020-05-25 2020-10-10 2020-06-04 2021-04-08 Operational Systems payments made under the EEP Selection are reaching eligible beneficiaries and to provide advice regarding the oversight and control framework EG-MOSS-221513-CS-CQS / Providing services for the annual advertising and Consultant promotional campaign for the Support SSN Targeting and Pending IBRD / 84960 Post Qualification Open - National 100,000.00 0.00 2021-02-24 2021-03-17 2021-04-30 2021-05-30 2021-07-04 2021-12-31 mechanisms and programs of Operational Systems Implementation Selection the Ministry of Social Solidarity through various social media platforms. EG-MOSS-235383-CS-QCBS / Hiring a System Integrator firm to design, development and operationalization of an integrated MIS platform. Also, Support SSN Targeting and Quality And Cost- Under to design, build, implement IBRD / 84960 Post Open - International 700,000.00 0.00 2021-05-27 2021-05-24 2021-06-07 2021-05-25 2021-07-08 2021-08-22 2021-09-02 2021-10-07 2021-10-28 2024-08-31 Operational Systems Based Selection Implementation data sharing mechanism for its integration among the relevant systems/modules and provide end users training. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual EG-MOSS-13931-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 30,000.00 0.00 Canceled 2017-07-31 2017-08-05 2017-08-26 2017-09-30 2018-03-29 PMU Office Manager Monitoring and Evaluation Selection EG-MOSS-58973-CS-INDV / Individual Project Management and Hiring Disability Advisor (ToR IBRD / 84960 Post Consultant Limited 20,000.00 4,164.58 Signed 2018-04-12 2018-03-14 2018-04-17 2019-01-15 2018-05-08 2019-01-23 2018-06-12 2019-02-01 2018-12-09 Monitoring and Evaluation attached) Selection EG-MOSS-58991-CS-INDV / Individual Project Management and Hiring Disability Operations IBRD / 84960 Post Consultant Limited 7,000.00 7,076.35 Signed 2018-04-12 2018-03-11 2018-04-17 2018-03-21 2018-05-08 2018-03-26 2018-06-12 2018-04-10 2018-12-09 Monitoring and Evaluation Officer Selection EG-MOSS-58992-CS-INDV / Individual Project Management and Hiring Disability Capacity IBRD / 84960 Post Consultant Limited 7,500.00 7,448.79 Signed 2018-04-12 2018-03-11 2018-04-17 2018-03-28 2018-05-08 2018-04-19 2018-06-12 2018-05-02 2018-12-09 Monitoring and Evaluation Development Officer Selection Individual EG-MOSS-58993-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 24,000.00 18,622.35 Signed 2018-04-12 2018-03-05 2018-04-17 2018-09-12 2018-05-08 2018-09-20 2018-06-12 2018-10-01 2018-12-09 Hiring M&E Specialist Monitoring and Evaluation Selection EG-MOSS-58995-CS-INDV / Individual Project Management and Hiring Monitoring IBRD / 84960 Post Consultant Limited 8,000.00 8,317.82 Signed 2018-04-12 2018-03-15 2018-04-17 2018-03-19 2018-05-08 2018-03-25 2018-06-12 2018-04-01 2018-12-09 Monitoring and Evaluation Coordinators Selection EG-MOSS-59002-CS-INDV / Individual Project Management and Hiring Radio Episodes IBRD / 84960 Post Consultant Limited 5,500.00 9,310.99 Signed 2018-04-12 2018-03-21 2018-04-17 2018-03-28 2018-05-08 2018-04-11 2018-06-12 2018-04-17 2018-12-09 Monitoring and Evaluation Composer/Producer Selection Page 5 Individual EG-MOSS-70742-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 10,000.00 4,840.21 Signed 2018-07-24 2018-06-25 2018-07-26 2018-06-26 2018-07-27 2018-06-27 2018-07-30 2018-07-01 2019-07-30 Photographer Monitoring and Evaluation Selection EG-MOSS-70743-CS-INDV / Individual Project Management and Conditionality Capacity IBRD / 84960 Post Consultant Limited 8,000.00 10,366.23 Signed 2018-07-26 2018-06-24 2018-07-28 2018-07-26 2018-07-29 2018-07-29 2018-07-31 2018-08-01 2019-01-27 Monitoring and Evaluation Building Expert Selection EG-MOSS-76654-CS-INDV / Individual Project Management and Hiring Regulatory & IBRD / 84960 Post Consultant Limited 28,500.00 31,036.63 Signed 2018-09-02 2018-08-21 2018-09-07 2018-08-26 2018-09-12 2018-08-30 2018-09-20 2018-09-04 2019-07-17 Monitoring and Evaluation Governance Consultant Selection EG-MOSS-76655-CS-INDV / Individual Support SSN Targeting and Hiring MIS Database IBRD / 84960 Post Consultant Limited 16,000.00 0.00 Under Review 2018-09-02 2018-08-19 2018-09-07 2018-09-12 2018-09-22 2019-06-30 Operational Systems Administrator Selection Individual EG-MOSS-76656-CS-INDV / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 23,000.00 6,229.37 Signed 2018-09-03 2018-08-09 2018-09-08 2018-10-01 2018-09-14 2018-10-16 2018-09-23 2018-11-01 2019-06-30 Hiring MIS Business Analyst Operational Systems Selection Individual EG-MOSS-76657-CS-INDV / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 24,500.00 29,041.27 Signed 2018-09-03 2018-08-14 2018-09-08 2018-08-22 2018-09-13 2018-08-28 2018-09-19 2018-09-09 2019-06-26 Hiring MIS TA Team Leader Operational Systems Selection Individual EG-MOSS-76658-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 17,000.00 18,265.05 Signed 2018-09-02 2018-08-09 2018-09-07 2018-08-13 2018-09-10 2018-08-23 2018-09-17 2018-09-09 2019-06-30 Hiring MIS consultant Monitoring and Evaluation Selection Individual EG-MOSS-76660-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 11,000.00 10,621.42 Signed 2018-09-05 2018-08-13 2018-09-10 2018-08-26 2018-09-15 2018-08-29 2018-09-21 2018-09-09 2019-06-30 Hiring IT specialist Monitoring and Evaluation Selection Individual EG-MOSS-76688-CS-INDV / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 7,000.00 8,687.56 Signed 2018-09-03 2018-08-16 2018-09-08 2018-08-21 2018-09-11 2018-08-26 2018-09-18 2018-09-04 2018-10-18 Hiring ESMF Consultant Operational Systems Selection EG-MOSS-76935-CS-INDV / Hiring Bulk Data Entry Individual Consultants. Multiple Support SSN Targeting and IBRD / 84960 Post Consultant Limited 28,000.00 3,099.81 Signed 2018-09-06 2018-08-15 2018-09-26 2018-08-22 2018-10-01 2018-08-27 2018-10-18 2018-09-10 2019-05-16 consultants are expected to Operational Systems Selection be hired to perform such huge task. EG-MOSS-76937-CS-INDV / Individual Support SSN Targeting and Hiring MIS Software IBRD / 84960 Post Consultant Limited 13,500.00 0.00 Canceled 2018-09-05 2018-08-20 2018-09-10 2018-09-15 2018-09-30 2019-06-30 Operational Systems Development Consultant Selection Individual EG-MOSS-81681-CS-INDV / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 23,000.00 0.00 Canceled 2018-10-11 2018-10-15 2018-10-16 2018-10-19 2018-10-24 2019-10-31 Hire GIS Consultant in the PIU Operational Systems Selection EG-MOSS-85352-CS-INDV / Individual Project Management and Hiring Advisor for Community IBRD / 84960 Post Consultant Limited 23,000.00 5,795.16 Signed 2018-11-01 2018-10-08 2018-11-06 2018-10-17 2018-11-11 2018-10-24 2018-11-21 2018-11-01 2019-10-31 Monitoring and Evaluation Affairs Selection EG-MOSS-95771-CS-INDV / Individual Hiring Civil Society Project Management and IBRD / 84960 Post Consultant Limited 22,000.00 25,026.62 Signed 2019-01-22 2018-12-03 2019-01-27 2018-12-23 2019-01-29 2018-12-25 2019-02-01 2019-01-01 2019-11-30 Organizations Coordinator in Monitoring and Evaluation Selection PIU EG-MOSS-95772-CS-INDV / Individual Hiring Strategy and Capacity Project Management and IBRD / 84960 Post Consultant Limited 22,000.00 25,026.62 Signed 2019-01-22 2018-12-18 2019-01-27 2018-12-20 2019-01-29 2018-12-23 2019-02-01 2019-01-01 2019-11-30 Development Coordinator in Monitoring and Evaluation Selection PIU EG-MOSS-95773-CS-INDV / Individual Project Management and Hiring Gender Outreach IBRD / 84960 Post Consultant Limited 22,000.00 25,034.39 Signed 2019-01-22 2018-12-16 2019-01-27 2018-12-12 2019-01-29 2018-12-24 2019-02-01 2019-01-01 2019-11-30 Monitoring and Evaluation Advisor Selection EG-MOSS-95774-CS-INDV / Individual Project Management and Hiring Senior Program IBRD / 84960 Post Consultant Limited 11,000.00 11,380.08 Signed 2019-01-22 2018-12-03 2019-01-27 2018-12-13 2019-01-29 2018-12-20 2019-02-01 2019-01-01 2019-11-30 Monitoring and Evaluation Assistant in PIU Selection EG-MOSS-85353-CS-INDV / Individual Project Management and Hiring Procurement Assistant IBRD / 84960 Post Consultant Limited 11,500.00 0.00 Canceled 2018-11-08 2018-11-13 2018-11-28 2018-12-08 2019-11-30 Monitoring and Evaluation (Jr procurement specialist) Selection EG-MOSS-117748-CS-INDV Individual Project Management and / Program Legal Advisor (6 IBRD / 84960 Post Consultant Limited 8,000.00 7,446.48 Signed 2019-06-01 2019-05-30 2019-06-06 2019-05-24 2019-06-27 2019-05-27 2019-08-01 2019-06-03 2020-01-28 Monitoring and Evaluation month agreement) Selection Individual EG-MOSS-117819-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,500.00 1,514.50 Signed 2019-06-03 2019-05-30 2019-06-08 2019-05-02 2019-06-29 2019-05-19 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (1) Monitoring and Evaluation Selection Individual EG-MOSS-117825-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,000.00 1,364.95 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-06-23 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (2) Monitoring and Evaluation Selection Individual EG-MOSS-117826-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,000.00 934.22 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-05-20 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (3) Monitoring and Evaluation Selection Individual EG-MOSS-117827-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 1,500.00 1,442.53 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-05-23 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (4) Monitoring and Evaluation Selection Individual EG-MOSS-117828-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,500.00 659.47 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-05-21 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (5) Monitoring and Evaluation Selection Individual EG-MOSS-117830-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,000.00 351.72 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-05-23 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (6) Monitoring and Evaluation Selection Page 6 Individual EG-MOSS-119697-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 16,000.00 6,884.14 Signed 2019-06-19 2019-06-23 2019-06-24 2019-06-02 2019-07-15 2019-06-18 2019-08-19 2019-07-01 2020-02-15 / Call Center Specialist Monitoring and Evaluation Selection Individual EG-MOSS-70741-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 12,000.00 11,421.48 Signed 2018-07-24 2018-07-24 2018-07-26 2018-07-26 2018-07-27 2018-07-29 2018-07-31 2018-08-01 2019-07-31 Senior Multimedia Specialist Monitoring and Evaluation Selection Individual EG-MOSS-128015-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 10,000.00 0.00 Canceled 2019-08-19 2019-08-19 2019-08-24 2019-09-14 2019-10-19 2020-04-16 / Call Center Specialist Monitoring and Evaluation Selection Individual EG-MOSS-135023-CS-CQS / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 10,000.00 10,276.20 Signed 2019-09-23 2019-07-15 2019-09-28 2019-07-11 2019-10-19 2019-07-16 2019-11-23 2019-07-22 2020-05-21 Disability Advisor Operational Systems Selection Individual EG-MOSS-141172-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 1,000.00 5,797.64 Signed 2019-10-01 2019-10-01 2019-10-06 2019-09-15 2019-10-27 2019-09-22 2019-12-01 2019-10-01 2020-05-29 / Administrative Assistant Operational Systems Selection Individual EG-MOSS-141576-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 5,000.00 24,821.60 Signed 2019-09-15 2019-09-15 2019-09-20 2019-09-17 2019-10-11 2019-09-19 2019-11-15 2019-10-01 2020-05-13 / Disability Officer Operational Systems Selection EG-MOSS-141559-CS-INDV Individual / The Consultant shall Support SSN Targeting and IBRD / 84960 Post Consultant Limited 3,400.00 3,447.41 Signed 2019-09-15 2019-08-08 2019-09-20 2019-08-15 2019-10-11 2019-08-28 2019-11-15 2019-09-15 2020-05-13 perform the Services as Social Operational Systems Selection Protection Officer. Individual EG-MOSS-141185-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 15,000.00 14,089.14 Signed 2019-10-01 2019-10-01 2019-10-06 2019-10-03 2019-10-27 2019-10-06 2019-12-01 2019-10-15 2020-05-29 / Monitoring Coordinator Operational Systems Selection Individual EG-MOSS-143552-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 2,700.00 2,325.73 Signed 2019-10-30 2019-09-12 2019-11-04 2019-09-17 2019-11-25 2019-09-22 2019-12-30 2019-10-01 2020-06-27 / Administrative Assistant Operational Systems Selection Individual EG-MOSS-143561-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 5,000.00 4,153.43 Signed 2019-10-30 2019-09-10 2019-11-04 2019-09-17 2019-11-25 2019-09-24 2019-12-30 2019-10-01 2020-06-27 / Administrative Assistant Operational Systems Selection Individual EG-MOSS-143566-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 5,000.00 4,580.45 Signed 2019-10-30 2019-10-30 2019-11-04 2019-10-22 2019-11-25 2019-10-27 2019-12-30 2019-11-01 2020-06-27 / Administrative Assistant Operational Systems Selection Individual EG-MOSS-143579-CS-INDV Support SSN Targeting and Pending IBRD / 84960 Post Consultant Limited 30,000.00 0.00 2019-11-25 2019-12-25 / Field Operation Manager Operational Systems Implementation Selection Individual EG-MOSS-143589-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 34,000.00 30,813.99 Signed 2019-10-30 2019-10-15 2019-11-04 2019-10-17 2019-11-25 2019-10-22 2019-12-30 2019-11-01 2020-06-27 / GIS Consultant Operational Systems Selection Individual EG-MOSS-143591-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 30,000.00 29,981.26 Signed 2019-10-30 2019-10-15 2019-11-04 2019-10-01 2019-11-25 2019-10-27 2019-12-30 2019-11-01 2020-06-27 / Senior researcher Operational Systems Selection EG-MOSS-147248-CS-INDV Individual Support SSN Targeting and / Monitoring & Evaluation and IBRD / 84960 Post Consultant Limited 40,000.00 42,221.15 Signed 2019-11-26 2019-11-25 2019-12-01 2019-11-24 2019-12-22 2019-12-01 2020-01-26 2019-12-15 2020-07-24 Operational Systems Research Advisor Selection EG-MOSS-147260-CS-INDV Individual Support SSN Targeting and / Health Conditionality IBRD / 84960 Post Consultant Limited 40,000.00 25,332.99 Signed 2019-11-26 2019-11-25 2019-12-01 2019-12-01 2019-12-22 2019-12-08 2020-01-26 2019-12-15 2020-07-24 Operational Systems Advisor Selection EG-MOSS-118096-CS-CDS / Provision of integrated social Project Management and protection services to enhance IBRD / 84960 Post Direct Selection Direct 200,000.00 0.00 Canceled 2019-06-04 2019-06-04 2019-06-14 2019-08-18 2020-02-14 Monitoring and Evaluation "Takaful and Karama" program among local communities EG-MOSS-151080-CS-INDV Individual Support SSN Targeting and / Education Conditionality IBRD / 84960 Post Consultant Limited 23,000.00 22,486.65 Signed 2019-12-18 2019-11-28 2019-12-23 2019-12-01 2020-01-13 2019-12-12 2020-02-17 2019-12-19 2020-08-15 Operational Systems Advisor Selection EG-MOSS-169705-CS-INDV Individual Support SSN Targeting and / Self-Employment and IBRD / 84960 Post Consultant Limited 42,000.00 42,116.23 Signed 2020-04-21 2020-05-01 2020-04-26 2020-04-19 2020-05-17 2020-04-26 2020-06-21 2020-05-01 2020-12-18 Operational Systems Livelihoods Manager Selection EG-MOSS-190238-CS-CDS / The objective of the financial audit service is to enable the auditor to express a single professional opinion on the Support SSN Targeting and IBRD / 84960 Post Direct Selection Direct 55,000.00 55,946.72 Signed 2020-08-25 2020-08-23 2020-09-04 2020-09-01 2020-11-08 2020-09-15 2021-05-07 financial position of the Operational Systems project at the end of each fiscal year, and on funds received and expenditures for a relevant accounting period Individual EG-MOSS-193761-CS-CQS / Support SSN Targeting and IBRD / 89970 Post Consultant Limited 15,000.00 13,775.51 Signed 2020-09-24 2020-09-21 2020-09-29 2020-11-10 2020-10-20 2020-11-15 2020-11-24 2020-11-25 2021-05-23 Program officer. Operational Systems Selection EG-MOSS-193762-CS-CQS / Individual Support SSN Targeting and Monitoring, Evaluation and IBRD / 89970 Post Consultant Limited 27,000.00 11,483.25 Signed 2020-09-24 2020-09-21 2020-09-29 2020-10-14 2020-10-20 2020-10-19 2020-11-24 2020-11-01 2021-05-23 Operational Systems Data Management Specialist. Selection Individual EG-MOSS-193766-CS-CQS / Support SSN Targeting and Under IBRD / 89970 Post Consultant Limited 12,000.00 0.00 2020-09-24 2020-09-21 2020-09-29 2020-10-20 2020-11-24 2021-05-23 Governorate Field Coordinator Operational Systems Implementation Selection Individual EG-MOSS-194034-CS-CQS / Support SSN Targeting and IBRD / 89970 Post Consultant Limited 27,000.00 22,959.18 Signed 2020-09-24 2020-09-21 2020-09-29 2020-10-14 2020-10-20 2020-10-18 2020-11-24 2020-11-01 2021-05-23 Senior employment officer. Operational Systems Selection Page 7 EG-MOSS-194311-CS-CQS / Individual Support SSN Targeting and Self-Employment and IBRD / 89970 Post Consultant Limited 27,000.00 26,768.64 Signed 2020-09-24 2020-09-21 2020-09-29 2020-12-15 2020-10-20 2020-12-20 2020-11-24 2021-01-01 2021-05-23 Operational Systems Livelihoods Senior Officer. Selection Individual EG-MOSS-194319-CS-CQS / Support SSN Targeting and IBRD / 89970 Post Consultant Limited 15,000.00 13,014.35 Signed 2020-09-24 2020-09-21 2020-09-29 2020-09-30 2020-10-20 2020-10-07 2020-11-24 2020-10-20 2021-05-23 Agribusiness officer. Operational Systems Selection Individual EG-MOSS-194329-CS-CQS / Support SSN Targeting and Under IBRD / 89970 Post Consultant Limited 38,000.00 0.00 2020-09-24 2020-09-21 2020-09-29 2020-10-20 2020-11-24 2021-05-23 wage employment manager. Operational Systems Implementation Selection Individual EG-MOSS-194348-CS-CQS / Support SSN Targeting and IBRD / 89970 Post Consultant Limited 23,000.00 20,676.45 Signed 2020-09-24 2020-09-21 2020-09-29 2020-09-28 2020-10-20 2020-10-01 2020-11-24 2020-10-15 2021-05-23 FORSA coordinator. Operational Systems Selection Individual EG-MOSS-194417-CS-CQS / Support SSN Targeting and Under IBRD / 89970 Post Consultant Limited 19,000.00 0.00 2020-09-24 2020-09-21 2020-09-29 2020-10-20 2020-11-24 2021-05-23 advocacy coordinator. Operational Systems Implementation Selection Individual EG-MOSS-215456-CS-CQS / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 8,000.00 6,130.27 Signed 2021-01-25 2021-01-05 2021-01-30 2021-01-20 2021-02-20 2021-01-25 2021-03-27 2021-02-03 2021-09-23 M&E assistant Operational Systems Selection EG-MOSS-225235-CS-INDV / Financial manager that will prepare and extract regular Individual Support SSN Targeting and Under financial reports to assist IBRD / 84960 Post Consultant Limited 27,000.00 0.00 2021-03-17 2021-02-09 2021-03-22 2021-04-12 2021-05-17 2021-11-13 Operational Systems Implementation FORSA Program Director in Selection making decisions that affect the program. EG-MOSS-235090-CS-INDV / M & E Senior Advisor for 10 Individual Support SSN Targeting and Under days to provide technical IBRD / 84960 Post Consultant Limited 1,000.00 0.00 2021-05-23 2021-05-16 2021-05-28 2021-06-18 2021-07-23 2022-01-19 Operational Systems Implementation assistance to the FORSA Selection program. EG-MOSS-235353-CS-INDV Individual Support SSN Targeting and Under / Agribusiness & livestock IBRD / 84960 Post Consultant Limited 4,000.00 0.00 2021-05-23 2021-05-16 2021-05-28 2021-06-18 2021-07-23 2022-01-19 Operational Systems Implementation advisor. Selection Page 8 PROCUREMENT PLAN (Textual Part) Project information: [Mozambique] [Sustainable Rural Economy Program] [P-174002] Project Implementation agency: [Ministério da Agricultura e Desenvolvimento Rural] Date of the Procurement Plan: [2021, 01 April] Period covered by this Procurement Plan: [18 months] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in “Regulamento de Contratação de Empreitada de Obras Públicas, Fornecimento de Bens e Prestação de Serviços ao Estado” of the Republic of Mozambique of March 8, 2016 (“the Regulation”), as per Decree No. 5/2016, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). NA Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; To be identified Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]: To be identified Other Relevant Procurement Information. NA PROCUREMENT Mozambique : Sustainable Rural Economy Program PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2021-05-07 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174002 GPN Date: Project Name: Sustainable Rural Economy Program Loan / Credit No: / Foundation for the Conservation of Biodiversity Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 10/ANAC/SREP/G/21 / Under Enhancing natural resources Acquisition of 5 motorbike for / Post Direct Selection Direct 5,000.00 0.00 Implementati 2021-06-15 2021-06-03 2021-06-20 2021-07-25 2022-01-21 management Tchuma Tchato on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 08/ANAC/SREP/CQS/21 / Consultant Development of the Enhancing natural resources / Post Qualification Open - National 23,200.00 0.00 Under Review 2021-05-31 2021-06-03 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 Management Plan for the management Selection Mágoe National Park 09/ANAC/SREP/CQS/21 / Development of an Integrated Consultant Enhancing natural resources Development Plan for the / Post Qualification Open - National 80,000.00 0.00 Under Review 2021-05-31 2021-06-03 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 management Tchuma Tchato Community Selection Program INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01/BIOFUND/SREP/IC/21 / Individual Strengthening institutions Under Procurement Officer for / Prior Consultant Open 72,000.00 0.00 2021-05-31 2021-06-09 2021-07-19 2021-08-09 2021-09-13 2022-03-12 and policies Implementation BIOFUND Selection Individual 02/BIOFUND/SREP/IC/21 / Strengthening institutions Under / Post Consultant Open 60,000.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Accountant for BIOFUND and policies Implementation Selection 07/ANAC/SREP/IC/21 / Individual Finance and Human Resources Enhancing natural resources Under / Post Consultant Open 60,000.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Officer for Mágoe National management Implementation Selection Park 06/ANAC/SREP/IC/21 / Community Development and Individual Enhancing natural resources Under Environmental Education / Post Consultant Open 60,000.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 management Implementation Officer for the Mágoe National Selection Park 04/ANAC/SREP/IC/21 / Individual Enhancing natural resources Under Operations Manager for / Post Consultant Open 103,200.00 0.00 2021-05-31 2021-06-10 2021-07-19 2021-08-09 2021-09-13 2022-03-12 management Implementation Tchuma Tchato Selection 05/ANAC/SREP/IC/21 / Community Development and Individual Enhancing natural resources Under Environmental Education / Post Consultant Open 60,000.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 management Implementation Officer for the Tchuma Tchato Selection Community Program 03/ANAC/SREP/IC/21 / Individual Enhancing natural resources Under Operations Manager for / Post Consultant Open 103,200.00 0.00 2021-05-31 2021-06-03 2021-07-19 2021-08-09 2021-09-13 2022-03-12 management Implementation Mágoe National Park Selection Page 1 Programa de Inversiones para el Desarrollo Sostenible, P147342 PRESUPUESTO GLOBAL CONSOLIDADO (Expresado en millones de US$.) COSTOS DEL PROGRAMA Costo Total BANCO Componentes OEFA % de Financiamiento Programa MUNDIAL Componente 1: Monitoreo y USD USD USD 61,432,392 87.2% Análisis Ambiental 37,277,479 24,154,913 Componente 2: Divulgación de USD USD 4,829,837 USD 2,107,316 6.9% Información y Participación Pública 2,722,521 Componente 3: Gestión del USD 4,159,319 USD 4,159,319 5.9% Programa USD USD Costo Total USD 70,421,548 100% 40,000,000 30,421,548 From: Selene del Rocio La Vera Sent: Tuesday, November 08, 2016 9:37 AM To: Fernando Loayza Subject: FW: Plan de Adquisiciones Estimado Fernando He revisado esta versión del plan de adquisiciones, correspondiente a los primeros 18 meses de implementación del Proyecto, y la encuentro aceptable, por lo que si estás de acuerdo desde el punto de vista técnico, se podría dar la No Objeción. Saludos, Rocío La Vera Zavaleta Procurement Specialist Governance T PROCUREMENT Peru : Peru: Enhancement of Environmental Quality Services PLAN General Information Country: Peru Bank’s Approval Date of the Original Procurement Plan: 2017-08-10 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147342 GPN Date: 2017-08-09 Project Name: Peru: Enhancement of Environmental Quality Services Loan / Credit No: IBRD / 86800 O Executing Agency(ies): rganismo de Evaluación y Fiscalización Ambiental WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PE-OEFA-163557-CW-RFQ / Information Information 2.2.1 Implementacion e Disclosure and Public Request for Single Stage - One 2020-11- Instalación del Cable IBRD / 86800 Participation for Post Open - National 104,860.00 61,401.64 Completed 2020-03-14 2020-05-09 2020-12-01 Quotations Envelope 05 Alimentador eléctrico al Area Environmental Quality del Data Center del MINAM Control PE-OEFA-225725-CW-RFB / Actividad 1.3.10: Construcción de Improve Environmental 27,614,667.5 Under 2022-10- IBRD / 86800 Prior Request for Bids 0.00 2021-03-24 2021-04-02 2021-05-14 2021-05-29 2021-07-03 infraestructura de laboratorio Quality Control 4 Review 12 e implementación de equipamiento GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-OEFA-52991-GO-RFB / 2.1.2 Mejoramiento de las Information Information capacidades tecnológicas del Disclosure and Public SENAMHI para la provisión de Single Stage - One IBRD / 86800 Participation for Prior Request for Bids Open - National 1,121,965.00 0.00 Canceled 2018-07-23 2018-08-07 2018-09-21 2018-10-21 2018-11-25 2019-03-25 datos meteorológicos, Envelope Environmental Quality hidrológicos, Control agrometeorológicos y ambientales al SINIA-SICCA PE-OEFA-52993-GO-RFB / 2.2.1 Mejoramiento de infraestructura Informatica del Information Information Data Center del MINAM que Disclosure and Public Single Stage - One posibilite el almacenamiento, IBRD / 86800 Participation for Prior Request for Bids Open - National 1,003,060.00 0.00 Canceled 2018-07-23 2018-08-07 2018-09-21 2018-10-21 2018-11-25 2019-04-24 Envelope adecuación, procesamiento y Environmental Quality distribución de información Control para el control de la calidad ambiental PE-OEFA-121005-GO-APA / 2.1.2 Mejoramiento de las capacidades tecnológicas del Information Information SENAMHI para la provisión de Disclosure and Public Single Stage - One datos meteorológicos, IBRD / 86800 Participation for Post Request for Bids Open - National 1,121,965.00 0.00 Canceled 2019-09-01 2019-09-13 2019-09-06 2019-09-13 2019-10-18 2019-11-17 2019-12-22 2020-06-19 Envelope hidrológicos, Environmental Quality agrometeorológicos y Control ambientales al SINIA-SICCA (PE-OEFA-52991-GO-RFB) PE-OEFA-121007-GO-RFB / 2.2.1 Mejoramiento de infraestructura Informatica del Information Information Data Center del MINAM que Disclosure and Public posibilite el almacenamiento, Single Stage - One IBRD / 86800 Participation for Post Request for Bids Open - National 1,003,060.00 0.00 Canceled 2020-05-01 2020-05-06 2020-06-17 2020-07-17 2020-08-21 2021-02-17 adecuación, procesamiento y Envelope Environmental Quality distribución de información Control para el control de la calidad ambiental (PE-OEFA-52993- GO-RFB) PE-OEFA-194432-GO-RFB / 2.2.1 Adquisición de bienes para el mejoramiento de infraestructura informática del Information Information Data Center del MINAM y Disclosure and Public Single Stage - One SENAMHI que posibilite el IBRD / 86800 Participation for Prior Request for Bids Open - International 5,322,948.00 0.00 Canceled 2020-09-17 2020-10-30 2020-09-22 2020-10-30 2020-11-03 2021-03-26 2020-11-18 2021-04-12 2020-12-16 2021-06-14 Envelope almacenamiento, adecuación, Environmental Quality procesamiento y distribución Control de información para el control de la calidad ambiental (121007) PE-OEFA-230141-GO-RFB / 2.2.1 Adquisición de bienes para el mejoramiento de infraestructura informática del Information Information Data Center del MINAM y Disclosure and Public Under Single Stage - One SENAMHI que posibilite el IBRD / 86800 Participation for Prior Request for Bids Open - International 5,322,948.00 0.00 Implementati 2021-04-19 2021-05-02 2021-04-25 2021-05-05 2021-06-06 2021-06-21 2021-07-19 2022-01-15 Envelope almacenamiento, adecuación, Environmental Quality on procesamiento y distribución Control de información para el control de la calidad ambiental (194432) PE-OEFA-238838-GO-RFB / 1.2.7 Implementación de Improve Environmental Single Stage - One Estaciones y equipos de IBRD / 86800 Prior Request for Bids Open - International 13,875,586.72 0.00 Under Review 2021-06-10 2021-06-15 2021-07-27 2021-08-26 2021-09-30 2022-03-29 Quality Control Envelope monitoreo de la calidad del agua y suelo NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PE-OEFA-81024-NC-RFQ / Servicio de gestión integral para la habilitación urbana del terreno para la construcción Improve Environmental Request for Single Stage - One IBRD / 86800 Post Open - National 25,000.00 12,178.82 Completed 2018-10-17 2018-12-12 2018-11-26 2019-06-10 2019-10-08 del laboratorio de análisis de Quality Control Quotations Envelope muestras ambientales y de validación y dirimencia del OEFA PE-OEFA-163551-NC-RFQ / Information Information 2.2.1 Servicio de Adecuación Disclosure and Public Request for Single Stage - One de Ambientes para el Nuevo IBRD / 86800 Participation for Post Open - National 39,320.00 46,430.96 Signed 2020-03-14 2020-05-09 2020-10-19 2020-11-05 Quotations Envelope Data Center del Ministerio del Environmental Quality Ambiente (MINAM) Control CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-OEFA-17166-CS-CQS / 1.1.3 Consultoría para la elaboración de propuesta de Protocolo Nacional de Consultant Improve Environmental Monitoreo de la Calidad de IBRD / 86800 Post Qualification Open - International 50,000.00 99,162.14 Signed 2017-08-21 2017-08-16 2017-09-05 2017-09-25 2017-09-15 2017-10-15 2017-10-27 2017-11-04 2017-11-20 2018-04-03 Quality Control Aire y Directiva para realizar Selection auditorias de aseguramiento de monitoreo de calidad de aire. Information Information PE-OEFA-17381-CS-CQS / Disclosure and Public Consultant 2.5.0.3 Elaboración del IBRD / 86800 Participation for Post Qualification Open - International 60,976.36 57,205.50 Signed 2017-08-21 2017-09-13 2017-09-05 2017-09-25 2017-10-26 2017-10-12 2017-12-04 2017-10-25 2017-12-06 2017-12-24 estudio de demanda Environmental Quality Selection Control PE-OEFA-17288-CS-QCBS / 1.1.12 Elaboración de estudios base que sirvan de Improve Environmental Quality And Cost- insumo para la elaboración de IBRD / 86800 Post Open - International 91,373.00 0.00 Canceled 2017-10-16 2017-11-22 2017-10-31 2017-11-30 2018-01-22 2017-12-30 2018-02-28 2018-01-09 2018-04-04 2018-02-06 2018-03-02 2018-09-28 Quality Control Based Selection propuestas técnicas de ECA y LMP para Efluentes que se prioricen PE-OEFA-17290-CS-QCBS / 1.1.15 Identificar las actividades extractivas Improve Environmental Quality And Cost- relacionadas a sustancias IBRD / 86800 Post Open - International 73,098.30 0.00 Canceled 2017-11-01 2017-11-22 2018-01-05 2018-02-02 2018-03-04 2018-04-08 2018-05-13 2018-11-19 Quality Control Based Selection peligrosas que pueden afectar al suelo en la cuenca del río Rímac PE-OEFA-34855-CS-QBS / 1.2.1 Estudio para la determinación de la ubicación Improve Environmental Quality Based IBRD / 86800 Post Open - National 179,274.00 269,007.69 Signed 2017-10-31 2017-09-06 2017-10-31 2018-01-18 2017-11-02 2017-11-06 2017-11-30 2017-12-12 2017-12-05 2018-01-05 2017-12-20 2018-03-08 2017-12-29 2018-03-19 2018-06-27 de las estaciones fijas del Quality Control Selection monitoreo de aire en provincias PE-OEFA-17353-CS-QCBS / 1.2.1 Estudio para la determinación de la ubicación Improve Environmental Quality And Cost- IBRD / 86800 Post Open - International 182,930.00 0.00 Canceled 2017-09-11 2017-09-06 2017-09-26 2017-10-06 2017-11-05 2017-11-11 2017-11-20 2017-12-16 2018-07-14 de las estaciones fijas del Quality Control Based Selection monitoreo de aire en provincias PE-OEFA-17360-CS-QCBS / 1.2.6.1 Consultoría para el monitoreo integral de la cuenca del rio Rimac Improve Environmental Quality And Cost- IBRD / 86800 Prior Open - International 1,184,603.00 1,496,522.47 Signed 2018-03-12 2018-06-19 2018-03-27 2018-06-21 2018-05-01 2018-10-24 2018-05-31 2018-12-27 2018-06-25 2019-01-24 2018-07-30 2019-06-03 2018-08-19 2019-07-12 2019-04-16 (Consultoría para el diseño y Quality Control Based Selection planificacion de la red de monitoreo de calidad de agua y suelo) PE-OEFA-48940-CS-QCBS / 1.2.6.2 Consultoría para el monitoreo integral de la cuenca del Río Moche Improve Environmental Quality And Cost- IBRD / 86800 Post Open - International 394,868.00 0.00 Canceled 2018-10-08 2018-10-23 2018-11-22 2018-12-22 2019-01-11 2019-02-11 2019-02-26 2020-01-22 (Consultoría para el diseño y Quality Control Based Selection planificacion de la red de monitoreo de calidad de agua y suelo) PE-OEFA-17165-CS-CQS / 1.1.2 Consultoría para Consultant elaborar la propuesta de ECA Improve Environmental IBRD / 86800 Post Qualification Open - International 80,792.00 154,830.00 Signed 2018-03-26 2018-03-23 2018-04-10 2018-05-10 2018-05-24 2018-06-09 2018-09-27 2018-07-04 2019-01-18 2018-12-21 aire respecto a metales Quality Control Selection pesados (Incluye el análisis de impacto regulatorio) PE-OEFA-48951-CS-CQS / 1.1.4 Consultoría para la elaboración de propuesta de LMP de emisiones para las Consultant Improve Environmental siguientes actividades: a) IBRD / 86800 Post Qualification Open - National 84,732.00 0.00 Canceled 2018-03-26 2018-04-11 2018-05-16 2018-06-05 2018-07-01 2019-03-08 Quality Control siderúrgica y fundiciones, b) Selection actividades minero metalúrgicas, c) calderos industriales, y d) Ladrilleras. PE-OEFA-49972-CS-CQS / 1.1.17 Elaboración del Manual de determinación de la línea Consultant Improve Environmental base de calidad de suelos, en IBRD / 86800 Post Qualification Open - National 19,797.00 0.00 Canceled 2018-07-30 2018-08-15 2018-09-14 2018-10-14 2018-11-08 2019-02-16 Quality Control el marco de la elaboración de Selection estudios de impacto ambiental. PE-OEFA-17354-CS-QCBS / 1.2.2.1 Elaboración de estudio Improve Environmental Quality And Cost- definitivo para las estaciones IBRD / 86800 Post Open - International 320,613.00 0.00 Canceled 2018-08-27 2018-09-11 2018-10-11 2018-11-10 2018-11-25 2018-12-25 2019-01-14 2019-04-14 Quality Control Based Selection y equipos de monitoreo de la calidad del aire Page 2 PE-OEFA-17357-CS-QCBS / 1.2.4 Diseño y ejecución de un programa de Improve Environmental Quality And Cost- fortalecimiento y/o desarrollo IBRD / 86800 Post Open - International 338,730.00 0.00 Canceled 2018-06-25 2018-07-11 2018-08-10 2018-09-09 2018-09-29 2018-11-08 2018-11-28 2020-12-27 Quality Control Based Selection de capacidades para las actividades de monitoreo ambiental PE-OEFA-17367-CS-CQS / Consultant Improve Environmental 1.3.3 Estudio de IBRD / 86800 Post Qualification Open - International 50,000.00 0.00 Canceled 2019-06-24 2019-07-09 2019-08-08 2019-09-02 2019-10-02 2020-03-20 Quality Control sostenibilidad financiera Selection PE-OEFA-17376-CS-QCBS / 1.3.15 Consultoría para la Improve Environmental Quality And Cost- IBRD / 86800 Post Open - International 194,000.00 0.00 Canceled 2018-04-30 2018-05-15 2018-06-14 2018-07-14 2018-08-03 2018-09-07 2018-09-27 2019-01-25 generación de línea base del Quality Control Based Selection proyecto Information Information PE-OEFA-17383-CS-QCBS / Disclosure and Public 2.5.0.5.2 Supervisión de la Quality And Cost- Pending IBRD / 86800 Participation for Post Open - International 151,304.00 0.00 2018-10-01 2018-10-16 2018-11-10 2018-12-10 2018-12-30 2019-01-29 2019-02-08 2020-06-30 implementación del Based Selection Implementation Environmental Quality Componente 2 Control Information Information PE-OEFA-49993-CS-CQS / Disclosure and Public Consultant 2.5.0.5.1 Supervisión del IBRD / 86800 Participation for Post Qualification Open - International 50,000.00 0.00 Canceled 2018-06-25 2018-07-11 2018-08-10 2018-08-30 2018-09-24 2019-02-21 estudio definitivo del Environmental Quality Selection Componente 2 Control PE-OEFA-17364-CS-QCBS / 1.2.10.1 Servicio de supervisión de la adquisición Improve Environmental Quality And Cost- de equipos e implementación IBRD / 86800 Prior Open - International 533,585.00 0.00 Canceled 2019-01-21 2019-02-11 2019-03-27 2019-04-24 2019-05-24 2019-06-28 2019-08-02 2020-06-27 Quality Control Based Selection de las estaciones de monitoreo de la calidad del aire PE-OEFA-17370-CS-QCBS / 1.3.6 Elaboración de Expediente Técnico de la Improve Environmental Quality And Cost- IBRD / 86800 Prior Open - International 1,100,210.22 570,738.00 Signed 2018-04-30 2018-05-22 2018-05-20 2018-05-25 2018-06-19 2018-10-23 2018-07-19 2018-12-12 2018-08-08 2019-01-16 2018-09-12 2019-05-19 2018-10-12 2019-06-10 2019-08-08 Infraestructura de Laboratorio Quality Control Based Selection y Especificaciones Técnicas de Equipos de Laboratorio PE-OEFA-62963-CS-QBS / 1.3.15 Consultoría para la Improve Environmental Quality Based IBRD / 86800 Post Open - National 194,000.00 194,000.00 Signed 2018-05-16 2018-04-12 2018-05-16 2018-05-20 2018-05-16 2018-06-19 2018-06-18 2018-07-04 2018-06-27 2018-08-03 2018-07-03 2018-08-13 2018-08-24 2018-12-21 generación de la Línea Base Quality Control Selection del Programa PE-OEFA-64697-CS-QCBS / 1.1.4 Elaboración de propuesta de LMP de emisiones para las siguientes Improve Environmental Quality And Cost- actividades: a) siderúrgica y IBRD / 86800 Post Open - International 235,001.00 236,885.00 Signed 2018-06-11 2018-05-30 2018-06-26 2018-07-16 2018-10-10 2018-08-15 2018-11-27 2018-09-04 2019-01-31 2018-10-14 2019-03-11 2018-11-03 2019-04-17 2019-05-02 Quality Control Based Selection fundiciones, b) actividades minero metalúrgicas, c) calderos industriales y d) ladrilleras PE-OEFA-49986-CS-QCBS / 1.2.2.2 Elaboración de estudio Improve Environmental Quality And Cost- definitivo para las estaciones IBRD / 86800 Prior Open - National 530,649.35 746,903.40 Signed 2018-06-25 2018-07-20 2018-07-11 2018-07-25 2018-08-20 2018-11-12 2018-09-19 2019-01-28 2018-10-09 2019-02-18 2018-11-18 2019-05-24 2019-01-02 2019-08-21 2019-07-11 Quality Control Based Selection y equipos de monitoreo de la calidad del agua y/o suelo PE-OEFA-17371-CS-QCBS / 1.3.8.1 Servicio de Improve Environmental Quality And Cost- supervisión del expediente IBRD / 86800 Prior Open - International 407,009.23 574,210.49 Signed 2019-02-25 2018-06-20 2019-03-12 2018-07-06 2019-04-11 2018-12-07 2019-05-11 2019-01-21 2019-05-31 2019-02-13 2019-07-10 2019-05-23 2019-08-04 2019-06-27 2019-11-02 Quality Control Based Selection técnico (diseño) de la infraestructura y equipos de laboratorio PE-OEFA-17358-CS-QCBS / 1.2.5 Consultoría de Improve Environmental Quality And Cost- inventario de emisiones, IBRD / 86800 Prior Open - International 1,000,000.00 1,044,513.91 Signed 2018-07-23 2018-10-17 2018-08-08 2018-10-19 2018-09-07 2019-04-08 2018-10-07 2019-05-27 2018-10-27 2021-04-12 2018-12-06 2021-04-19 2018-12-26 2020-02-03 2019-10-22 Quality Control Based Selection evaluación de red de monitoreo de Lima PE-OEFA-17289-CS-QCBS / 1.1.14.1 Consultoría para la realización de un inventario de actividades productivas, Improve Environmental Quality And Cost- extractivas y de servicios IBRD / 86800 Post Open - International 136,604.00 0.00 Canceled 2018-08-06 2018-08-22 2018-09-21 2018-10-21 2018-11-15 2018-12-25 2019-01-14 2019-07-23 Quality Control Based Selection relacionadas a sustancias peligrosas que pueden afectar al suelo en la cuenca del río Rímac. PE-OEFA-17374-CS-CQS / Consultant 1.3.9 Consultoría para la Improve Environmental IBRD / 86800 Post Qualification Open - International 60,000.00 0.00 Canceled 2019-01-21 2019-02-05 2019-03-07 2019-04-06 2019-05-01 2019-09-08 elaboración del estudio de Quality Control Selection impacto ambiental PE-OEFA-52983-CS-CQS / 1.1.8 Elaboración del diagnóstico de las tecnologías de procesos productivos y de las tecnologías de Consultant Improve Environmental tratamiento de las aguas IBRD / 86800 Post Qualification Open - National 46,419.00 0.00 Canceled 2019-01-14 2019-01-29 2019-02-28 2019-03-30 2019-04-24 2019-10-21 Quality Control residuales industriales Selection procedentes de las principales actividades económicas productivas ubicadas en la cuenca del rio Moche PE-OEFA-17380-CS-QCBS / 2.5.0.2.2 Elaboración de estudios definitivos para la Information Information implementación del Disclosure and Public Componente 2 Quality And Cost- IBRD / 86800 Participation for Prior Open - International 539,218.01 557,486.28 Signed 2018-07-02 2018-10-16 2018-07-17 2018-10-29 2018-08-16 2019-01-14 2018-09-15 2019-04-05 2018-10-05 2019-05-09 2018-11-04 2019-10-04 2018-11-24 2019-11-06 2019-02-22 (estandarización de Based Selection Environmental Quality procedimientos para el Control intercambio de datos sobre el control de la calidad ambiental) Page 3 PE-OEFA-82610-CS-QCBS / 1.1.12 Elaboración de Propuesta de LMP de efluentes para la industria Improve Environmental Quality And Cost- IBRD / 86800 Post Open - International 333,118.00 278,981.95 Signed 2018-10-24 2019-03-20 2018-11-14 2018-12-28 2019-05-13 2019-01-25 2019-06-24 2019-02-24 2019-07-31 2019-03-31 2020-05-07 2019-05-05 2020-07-20 2020-05-04 manufacturera, actividades Quality Control Based Selection agroindustriales, camales, plantas de beneficio y energía eléctrica PE-OEFA-88464-CS-QCBS / 1.2.3.2 Consultoría para revisión del estudio definitivo Improve Environmental Quality And Cost- (especificaciones técnicas / IBRD / 86800 Post Open - National 128,517.00 209,992.00 Signed 2018-11-29 2019-01-16 2018-12-20 2019-02-02 2019-04-16 2019-03-02 2019-05-28 2019-04-01 2019-06-07 2019-05-06 2019-09-11 2019-06-10 2019-11-20 2020-06-09 Quality Control Based Selection expediente técnico) para las estaciones de monitoreo de la calidad del agua y/o suelo PE-OEFA-112769-CS-QCBS / 1.2.2.1 ELABORACIÓN DE ESTUDIO DEFINITIVO (ESPECIFICACIONES TÉCNICAS Improve Environmental Quality And Cost- IBRD / 86800 Prior Open - International 1,095,671.00 386,860.73 Signed 2019-04-30 2019-05-23 2019-05-21 2019-05-30 2019-07-04 2021-04-28 2019-08-01 2019-10-24 2019-08-31 2021-04-28 2019-10-05 2021-04-29 2019-11-09 2020-11-09 2020-11-08 / EXPEDIENTE TÉCNICO) PARA Quality Control Based Selection LAS ESTACIONES Y EQUIPOS DE MONITOREO DE LA CALIDAD DEL AIRE PE-OEFA-120854-CS-QCBS / 1.2.10.1 Servicio de supervisión de la adquisición de equipos e implementación Improve Environmental Quality And Cost- Pending IBRD / 86800 Post Open - International 533,585.00 0.00 2021-06-01 2021-06-22 2021-08-05 2021-09-02 2021-10-02 2021-11-06 2021-12-11 2022-12-11 de las estaciones de Quality Control Based Selection Implementation monitoreo de la calidad del aire (PE-OEFA-17364-CS- QCBS) PE-OEFA-124818-CS-QCBS / 1.2.3.1 Revisión de estudio definitivo para las estaciones Improve Environmental Quality And Cost- IBRD / 86800 Post Open - International 291,699.00 281,298.97 Signed 2019-07-25 2019-08-02 2019-08-15 2019-09-28 2019-11-13 2019-10-26 2020-02-05 2019-11-25 2020-03-04 2019-12-30 2020-05-18 2020-02-03 2020-11-11 2021-02-02 de monitoreo de la calidad del Quality Control Based Selection aire (PE-OEFA-49987-CS- INDV) PE-OEFA-233773-CS-QCBS / 1.3.8.2 “Servicio de supervisión de la Improve Environmental Quality And Cost- Under IBRD / 86800 Post Open - International 1,106,016.83 0.00 2021-05-12 2021-05-18 2021-06-02 2021-06-20 2021-07-16 2021-08-13 2021-09-12 2021-10-17 2021-11-21 2022-11-21 infraestructura e Quality Control Based Selection Implementation implementación de los equipos de laboratorio” PE-OEFA-236741-CS-CQS / Consultant 1.2.11 Mejora del Sistema de Improve Environmental Under IBRD / 86800 Post Qualification Open - National 23,223.68 0.00 2021-05-28 2021-06-03 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Gestión de Residuos Sólidos Quality Control Implementation Selection (SIGERSOL) PE-OEFA-240186-CS-QCBS / 1.3.10 Consultoría para la Elaboración del Estudio definitivo y Expediente Improve Environmental Quality And Cost- Pending Técnico para la rehabilitación IBRD / 86800 Post Open - International 68,069.72 0.00 2021-06-21 2021-07-12 2021-08-25 2021-09-22 2021-10-22 2021-11-26 2021-12-31 2022-12-31 Quality Control Based Selection Implementation del servicio de alcantarillado en el terreno donde se construirá el laboratorio del OEFA INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-OEFA-17368-CS-INDV / 1.3.5 Elaboración de TdR para la elaboración del Expediente Individual Improve Environmental Técnico de la infraestructura IBRD / 86800 Post Consultant Limited 15,000.00 15,081.48 Signed 2017-09-08 2017-11-20 2017-09-18 2017-11-27 2017-09-28 2017-12-13 2017-10-18 2017-12-29 2018-01-26 Quality Control de laboratorio y las Selection Especificaciones Técnicas de los equipos de laboratorio PE-OEFA-17365-CS-INDV / Individual Improve Environmental 1.3.1 Estudio detallado de la IBRD / 86800 Post Consultant Limited 24,317.00 24,569.89 Signed 2017-08-29 2017-10-17 2017-09-08 2017-10-17 2017-09-15 2017-11-02 2017-09-27 2017-11-07 2017-12-26 Quality Control demanda y análisis de riesgo Selection PE-OEFA-17366-CS-INDV / Individual 1.3.2 Análisis legal para Improve Environmental IBRD / 86800 Post Consultant Limited 7,599.00 10,827.10 Signed 2017-10-03 2017-10-30 2017-10-13 2017-11-08 2017-10-20 2017-12-01 2017-11-01 2017-12-05 2017-12-21 implementar el laboratorio de Quality Control Selection dirimencia PE-OEFA-17379-CS-INDV / Information Information 2.5.0.1 Elaboración de Disclosure and Public Individual Términos de Referencia para IBRD / 86800 Participation for Post Consultant Limited 5,519.00 6,629.62 Signed 2017-09-14 2017-10-18 2017-09-24 2017-10-21 2017-10-02 2017-11-09 2017-10-14 2017-11-15 2017-12-03 expediente técnico del Environmental Quality Selection componente 2 Control Information Information PE-OEFA-17382-CS-INDV / Disclosure and Public Individual 2.5.0.4 Elaboración de IBRD / 86800 Participation for Post Consultant Limited 7,622.00 6,629.62 Signed 2017-09-15 2017-10-18 2017-09-25 2017-10-20 2017-10-05 2017-11-10 2017-10-22 2017-11-15 2017-12-11 Términos de Referencia para Environmental Quality Selection supervisión Control PE-OEFA-17164-CS-INDV / 1.1.1 Consultoría para la elaboración de Guía Metodológica para la Individual Improve Environmental Estimación de Costos y IBRD / 86800 Post Consultant Limited 25,510.00 30,812.00 Signed 2018-04-23 2018-03-20 2018-05-03 2018-03-23 2018-05-10 2018-05-25 2018-05-22 2018-06-13 2018-09-19 Quality Control Beneficios de la Normativa de Selection Calidad de Aire, en el Marco del Análisis de Impacto Regulatorio (RIA) PE-OEFA-49967-CS-INDV / 1.1.18 Elaboración de Individual Improve Environmental propuesta base para la IBRD / 86800 Post Consultant Limited 34,732.00 0.00 Canceled 2018-07-23 2018-07-30 2018-08-09 2018-08-29 2018-12-27 Quality Control confección de una Estrategia Selection Nacional de Aire Limpio. Page 4 PE-OEFA-49987-CS-INDV / 1.2.3.1 Revisión de estudio Individual Improve Environmental definitivo para las estaciones IBRD / 86800 Post Consultant Limited 40,358.00 0.00 Canceled 2019-01-28 2019-02-07 2019-02-17 2019-02-28 2019-06-28 Quality Control de monitoreo de la calidad del Selection aire PE-OEFA-23507-CS-INDV / 1.2.9 Términos de referencia Individual para el servicio de supervisión Improve Environmental IBRD / 86800 Post Consultant Limited 15,000.00 0.00 Canceled 2018-11-26 2018-12-06 2018-12-16 2018-12-26 2019-05-25 de la adquisición de equipos e Quality Control Selection implementación de las estaciones de monitoreo PE-OEFA-18189-CS-INDV / 1.3.7 Elaboración de TdR para Individual la supervisión de la Improve Environmental IBRD / 86800 Post Consultant Limited 12,000.00 0.00 Canceled 2018-12-17 2018-12-27 2019-01-06 2019-01-21 2019-04-29 implementación de la Quality Control Selection infraestructura y equipos de laboratorio PE-OEFA-49992-CS-INDV / Information Information 2.5.0.2.1 Elaboración de Disclosure and Public Individual estudios definitivos de la IBRD / 86800 Participation for Post Consultant Limited 20,000.00 19,582.09 Signed 2018-05-28 2018-04-25 2018-06-07 2018-05-13 2018-06-17 2018-06-05 2018-06-30 2018-06-19 2018-08-29 infraestructura tecnológica del Environmental Quality Selection Componente 2 Control PE-OEFA-118481-CS-CDS / 2.5.0.2.1 Servicio de Consultoría para la Information Information Actualización del estudio Disclosure and Public definitivo de la Infraestructura IBRD / 86800 Participation for Prior Direct Selection Direct 5,000.00 0.00 Canceled 2019-06-07 2019-06-17 2019-08-21 2020-02-17 Tecnológica del Componente Environmental Quality 2 del Programa Control Correspondiente al Data Center del SENAMHI (PE-OEFA- 49992-CS-INDV) PE-OEFA-118486-CS-INDV / 1.1.17 Elaboración del Manual de determinación de la línea Individual Improve Environmental base de calidad de suelos, en IBRD / 86800 Post Consultant Limited 28,639.00 31,614.00 Signed 2019-06-24 2019-07-24 2019-06-29 2019-09-06 2019-07-20 2019-09-18 2019-08-24 2019-10-03 2020-02-20 Quality Control el marco de la elaboración de Selection estudios de impacto ambiental. PE-OEFA-120040-CS-CDS / 2.5.0.2.1 Servicio de Consultoría para la Information Information Actualización del estudio Disclosure and Public definitivo de la Infraestructura IBRD / 86800 Participation for Post Direct Selection Direct 5,000.00 4,885.20 Completed 2019-06-20 2019-06-25 2019-06-30 2019-06-06 2019-09-03 2019-07-05 2020-03-01 2019-07-28 Tecnológica del Componente Environmental Quality 2 del Programa Control Correspondiente al Data Center del SENAMHI (PE-OEFA- 118481-CS-CDS) PE-OEFA-123790-CS-INDV / 2.5.0.2.1 Servicios de Consultoria para la Information Information Elaboración del Expediente Disclosure and Public Individual Técnico (Diseño) para el IBRD / 86800 Participation for Post Consultant Limited 7,500.00 7,525.83 Signed 2019-07-19 2019-07-24 2019-07-24 2019-08-05 2019-08-14 2019-08-16 2019-09-18 2019-08-22 2020-03-16 Montaje e Instalación del Environmental Quality Selection Cable Alimentador Eléctrico al Control área del Data Center de MINAM PE-OEFA-123792-CS-INDV / 2.5.0.2.1 Servicio de Consultoria para la Information Information Supervisión de la Elaboración Disclosure and Public Individual del Expediente Técnico IBRD / 86800 Participation for Post Consultant Limited 5,500.00 5,500.00 Completed 2019-07-19 2019-07-24 2019-07-24 2019-08-05 2019-08-14 2019-08-16 2019-09-18 2019-08-22 2020-03-16 2019-09-21 (Diseño) para el Montaje e Environmental Quality Selection Instalación del cable Control Alimentador eléctrico al área del Data Center de MINAM PE-OEFA-128862-CS-INDV / 1.2.6.1 Servicios de Consultoría para la supervisión en aguas Individual Improve Environmental superficiales y calidad del IBRD / 86800 Post Consultant Limited 44,118.00 44,776.12 Signed 2019-08-23 2019-09-06 2019-08-28 2019-09-12 2019-09-18 2019-09-23 2019-10-23 2019-10-03 2020-04-20 Quality Control agua de las actividades de la Selection “Consultoría para el Monitoreo Integral de la cuenca del río Rímac” PE-OEFA-128863-CS-INDV / 1.2.6.1 Servicios de Consultoría para la Individual supervisión en aguas Improve Environmental IBRD / 86800 Post Consultant Limited 44,118.00 44,776.12 Signed 2019-08-23 2019-08-28 2019-08-28 2019-09-12 2019-09-18 2019-09-19 2019-10-23 2019-09-25 2020-04-20 subterráneas de las Quality Control Selection actividades de la “Consultoría para el Monitoreo Integral de la cuenca del río Rímac” PE-OEFA-128864-CS-INDV / 1.2.6.1 Servicios de Consultoría para la Individual supervisión en hidrobiología Improve Environmental IBRD / 86800 Post Consultant Limited 44,118.00 0.00 Canceled 2019-08-23 2019-08-28 2019-09-18 2019-10-23 2020-04-20 de las actividades de la Quality Control Selection “Consultoría para el Monitoreo Integral de la cuenca del río Rímac” PE-OEFA-150794-CS-INDV / 2.5.0.2.1 SERVICIO DE CONSULTORIA PARA LA ACTUALIZACIÓN DEL ESTUDIO Information Information DEFINITIVO DE LA Disclosure and Public Individual INFRAESTRUCTURA IBRD / 86800 Participation for Post Consultant Open 27,280.00 26,285.05 Completed 2019-12-20 2019-12-26 2020-02-07 2020-02-28 2020-02-28 2020-03-12 2020-04-03 2020-05-18 2020-09-30 2021-01-03 TECNOLÓGICA DEL Environmental Quality Selection COMPONENTE 2 DEL Control PROGRAMA CORRESPONDIENTE AL DATA CENTER DEL MINAM y SENAMHI Page 5 PE-OEFA-158278-CS-INDV / 1.2.5.1 Supervisión de las Individual Actividades de la Consultoría Improve Environmental Under IBRD / 86800 Post Consultant Limited 35,223.88 34,680.38 2020-02-07 2020-02-10 2020-02-12 2020-02-24 2020-03-04 2020-03-12 2020-04-08 2020-10-05 de Inventario de Emisiones, Quality Control Implementation Selection Evaluación de Red de Monitoreo de Lima PE-OEFA-163556-CS-INDV / Information Information 2.2.1 Supervisión del Servicio Disclosure and Public Individual de adecuación de ambientes IBRD / 86800 Participation for Post Consultant Limited 7,540.00 9,736.01 Signed 2020-03-09 2020-06-26 2020-03-14 2020-08-19 2020-04-04 2020-09-11 2020-05-09 2020-10-16 2020-11-05 para el Nuevo Data Center del Environmental Quality Selection MINAM Control PE-OEFA-164266-CS-INDV / 1.2.6.1. CONSULTORIA INDIVIDUAL PARA REALIZAR PERICIA A IMÁGENES Individual Improve Environmental FOTOGRÁFICAS DEL IBRD / 86800 Post Consultant Open 2,841.00 2,747.33 Completed 2020-03-13 2020-03-31 2020-05-01 2020-06-08 2020-05-22 2020-06-09 2020-06-26 2020-06-18 2020-12-23 2020-07-03 Quality Control PRODUCTO N°3 DE LA Selection CONSULTORIA:"MONITOREO INTEGRAL DE LA CUENCA DEL RIÓ RIMAC" PE-OEFA-163558-CS-CDS / Information Information 2.2.1 Supervision de la Disclosure and Public Implementacion e Instalación IBRD / 86800 Participation for Post Direct Selection Direct 7,540.00 7,796.16 Completed 2020-03-09 2020-07-14 2020-03-19 2020-07-13 2020-05-23 2020-10-26 2020-11-19 2021-03-31 del Cable Alimentador Environmental Quality eléctrico al área del Data Control Center del MINAM PE-OEFA-204155-CS-INDV / Individual 1.3.16 Consultoria para la Improve Environmental IBRD / 86800 Post Consultant Open 25,000.00 25,000.00 Signed 2020-11-11 2020-11-16 2020-12-15 2021-01-26 2020-12-20 2021-01-26 2020-12-30 2021-01-29 2021-02-28 Evaluación Intermedia del Quality Control Selection Programa PE-OEFA-211470-CS-INDV / 1.2.11 Especialista en Análisis Individual y Diseño de base de datos Improve Environmental IBRD / 86800 Post Consultant Open 10,135.00 0.00 Canceled 2020-12-29 2021-03-10 2021-02-16 2021-03-09 2021-04-13 2021-10-10 para lograr mejoras al sistema Quality Control Selection de gestión de residuos sólidos (SIGERSOL) PE-OEFA-211473-CS-INDV / 1.2.11 Especialista en diseño Individual Improve Environmental de interfaces de las mejoras al IBRD / 86800 Post Consultant Open 6,081.00 0.00 Canceled 2020-12-29 2021-03-10 2021-02-16 2021-03-09 2021-04-13 2021-10-10 Quality Control sistema de gestión de Selection residuos sólidos (SIGERSOL) PE-OEFA-211475-CS-INDV / 1.2.11 Especialista en Análisis y Programación de Individual Improve Environmental requerimientos para las IBRD / 86800 Post Consultant Open 6,757.00 0.00 Canceled 2020-12-29 2021-03-10 2021-02-16 2021-03-09 2021-04-13 2021-10-10 Quality Control Mejoras al Sistema de Gestión Selection de Residuos Sólidos (SIGERSOL) PE-OEFA-213729-CS-INDV / 2.5 Servicio de consultoría para la Actualización de la Information Information Plataforma MOODLE, Disclosure and Public Individual virtualización de los IBRD / 86800 Participation for Post Consultant Limited 17,669.00 0.00 Canceled 2021-01-15 2021-05-11 2021-01-20 2021-02-10 2021-03-17 2021-09-13 contenidos e Instalaciones del Environmental Quality Selection curso de educación ambiental Control para docentes desde el aula ambiental del MINAM PE-OEFA-213730-CS-INDV / 2.5 Servicio de Consultoría para la generación de Information Information contenidos y elaboración de Disclosure and Public Individual recursos educativos digitales IBRD / 86800 Participation for Post Consultant Limited 5,135.00 0.00 Canceled 2021-01-15 2021-04-09 2021-01-20 2021-02-10 2021-03-17 2021-09-13 dirigidos a escolares en Environmental Quality Selection materia de calidad ambiental Control que serán difundidos en el aula ambiental del MINAM PE-OEFA-235360-CS-CDS / 2.5.0.2.1 Consultoría para el Acompañamiento y Absolución de Consultas Information Information Realizadas en el Marco del Disclosure and Public Under Proceso de Licitación Pública IBRD / 86800 Participation for Post Direct Selection Direct 5,264.00 0.00 2021-05-19 2021-05-26 2021-05-29 2021-08-02 2022-01-29 Implementation Internacional (LPI) Referido a Environmental Quality la Adquisición de Bienes para Control el Mejoramiento de Infraestructura Informática del Data Center PE-OEFA-236735-CS-INDV / 2.5 Consultoría para la Generación de contenidos y Information Information elaboración de recursos Disclosure and Public Individual Under educativos digitales a IBRD / 86800 Participation for Post Consultant Limited 10,805.26 0.00 2021-05-28 2021-06-03 2021-06-02 2021-06-23 2021-07-28 2022-01-24 Implementation escolares en materia de Environmental Quality Selection calidad ambiental que serán Control difundidos en el aula ambiental PE-OEFA-236736-CS-INDV / 2.5 Consultoría para la Information Information actualización de la plataforma Disclosure and Public Individual MOODLE, virtualización de los Under IBRD / 86800 Participation for Post Consultant Limited 17,204.42 0.00 2021-05-28 2021-06-03 2021-06-02 2021-06-23 2021-07-28 2022-01-24 contenidos e instalacion del Implementation Environmental Quality Selection curso de educación ambiental Control para docentes desde el aula ambiental del MINAM Page 6 Procurement Plan I. General 2. Bank’s approval Date of the procurement Plan 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: July 1, 2018 to Dec 31, 2019 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: 2. Procurement Method Prior Review Comments Threshold US$ 1. ICB (Goods & NCS) Above US$ 500,000 All 2. Shopping (Goods & NCS) N/A 3. Direct Contracting (Goods & Above US$500,000 All NCS) 4. ICB (Works) Above US$ 1 million All 5. Shopping (Works) N/A 6. Direct Contracting (Works) Above US$ 1 million All 2. Prequalification. Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not applicable 4. Reference to (if any) Project Operational/Procurement Manual: 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 All 2. Single Source (Firms) All July 9, 2010 Above US$ 500,000 3. Individual Above US$ 200,000 All 2. Short list comprising entirely of national consultants: Not Applicable 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] July 9, 2010 PROCUREMENT Micronesia, Federated States of : Pacific Islands Regional Oceanscape Program - Federated States of Micronesia PLAN General Information Country: Micronesia, Federated States of Bank’s Approval Date of the Original Procurement Plan: 2018-09-04 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151754 GPN Date: Project Name: Pacific Islands Regional Oceanscape Program - Federated States of Micronesia Loan / Credit No: IDA / D0140 National Oceanic Resource Management Authority Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FM-NORMA-205046-CW-RFB Component 1: Sustainable Pending Single Stage - One 2021-06- / Satellite Office IDA / D0140 Management of Oceanic Post Request for Bids Open - National 0.00 Implementat 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 Envelope 09 Refurbishment Fisheries ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FM-NORMA-50002-GO-RFQ Component 1: Sustainable Request for Single Stage - One / Vehicles to support satellite IDA / D0140 Management of Oceanic Post Limited 41,290.00 Completed 2018-06-20 2020-03-25 2018-08-15 2020-06-05 2019-02-11 2020-08-17 Quotations Envelope offices in States Fisheries FM-NORMA-49996-GO-RFP Component 1: Sustainable / GENSETS to provide Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - National 19,950.00 Completed 2018-09-12 2018-11-07 2019-01-02 2019-05-06 2020-02-01 continuous power to VMS and Quotations Envelope Fisheries systems FM-NORMA-67074-GO-RFQ Component 1: Sustainable / Boats for monitoring Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - International 0.00 Canceled 2019-02-20 2019-04-17 2019-10-14 transhipment and support Quotations Envelope Fisheries satellite offices FM-NORMA-67089-GO-RFQ Component 1: Sustainable / Supply of computer Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - International 0.00 Canceled 2018-07-21 2018-09-15 2019-03-14 Hardware and Software for Quotations Envelope Fisheries IT/IMS FM-NORMA-46587-GO-RFQ Component 1: Sustainable / Supply of Observer IDA / D0140 Management of Oceanic Post Direct Selection Direct 0.00 Canceled 2020-01-26 2020-01-31 2020-03-06 2020-09-02 monitoring equipment (e.g Fisheries calibers, etc) FM-NORMA-50397-GO-RFQ Component 1: Sustainable / Supply of Marine Safety Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - International 0.00 Canceled 2020-01-17 2020-03-13 2020-09-09 Equipment (lot 2) for Quotations Envelope Fisheries observers and MCS Officers FM-NORMA-67047-GO-RFQ Component 1: Sustainable Request for Single Stage - One / Fisheries promotional IDA / D0140 Management of Oceanic Post Limited 3,168.00 Terminated 2020-02-14 2020-07-29 2020-04-10 2021-04-30 2020-05-10 Quotations Envelope materials Fisheries FM-NORMA-50386-NC-RFP Component 1: Sustainable Request for Single Stage - One / Unmanned aerial vehicle IDA / D0140 Management of Oceanic Post Open - International 16,263.34 Signed 2020-02-07 2020-03-02 2020-04-03 2020-06-23 2020-07-02 Quotations Envelope (UAV) Fisheries FM-NORMA-67147-GO-RFQ Component 1: Sustainable / Supply of lab and Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - International 18,123.86 Signed 2020-02-07 2020-02-11 2020-04-03 2020-07-14 2020-07-02 specialized Equipment for Quotations Envelope Fisheries Competent Authority FM-NORMA-105807-GO- Component 1: Sustainable RFQ / CA Offices and NORMA Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - National 28,511.45 Signed 2020-01-25 2020-02-11 2020-03-21 2020-06-29 2020-06-19 Office equipment and Quotations Envelope Fisheries furniture FM-NORMA-67071-GO-RFQ Component 1: Sustainable / Supply of marine ICT and Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - National 23,403.84 Signed 2020-01-22 2020-02-11 2020-03-18 2020-06-26 2020-09-14 safety equipment for MCS and Quotations Envelope Fisheries observers FM-NORMA-67158-GO-RFQ / Supply of Component 1: Sustainable Request for Single Stage - One Hardware/Software for IDA / D0140 Management of Oceanic Post Open - International 52,639.31 Signed 2020-02-07 2020-02-11 2020-04-03 2020-07-14 2020-07-02 2020-12-09 Quotations Envelope NORMA IMS and Competent Fisheries Authority offices FM-NORMA-183357-GO- Component 1: Sustainable Under RFQ / Lot 2 Marine Safety and Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - International 0.00 Implementati 2020-07-24 2020-10-30 2020-09-18 2021-03-17 ICT equipment and supplies Quotations Envelope Fisheries on for MCS and observers FM-NORMA-183359-GO- Component 1: Sustainable Under RFQ / Lot 2 Supply of IT Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - International 0.00 Implementati 2020-07-31 2020-10-30 2020-09-25 2020-12-24 hardware and Software to Quotations Envelope Fisheries on support IMS FM-NORMA-192171-GO- Component 1: Sustainable RFQ / Supply of Observer Request for Single Stage - One IDA / D0140 Management of Oceanic Post Limited 11,821.00 Signed 2020-09-12 2020-08-27 2020-11-07 2021-04-09 2021-05-06 Monitoring Equipment (e.g./ Quotations Envelope Fisheries calipers, etc.). FM-NORMA-67074-GO-RFQ- Component 1: Sustainable Under Request for Single Stage - One 2 / Rigid Hull Inflatable Boats IDA / D0140 Management of Oceanic Post Open - International 105,131.00 Implementati 2020-11-30 2021-01-11 2021-01-25 2021-05-25 Quotations Envelope for Transshipment monitoring Fisheries on FM-NORMA-205032-GO- Component 1: Sustainable Under Request for Single Stage - One RFQ / GENSET to replace small IDA / D0140 Management of Oceanic Post Open - National 0.00 Implementati 2020-11-30 2021-01-11 2021-01-25 2021-05-25 Quotations Envelope backup generator Fisheries on Page 1 FM-NORMA-205040-GO- Component 1: Sustainable Pending RFQ / Micro-Canning Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - International 0.00 Implementati 2020-12-05 2021-01-30 2021-05-30 Equipment for Pilot Quotations Envelope Fisheries on demonstration NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Sustainable FM-NORMA-67161-NC-DIR / IDA / D0140 Management of Oceanic Post Direct Selection Direct 13,000.00 Completed 2018-07-01 2018-07-28 2018-07-06 2018-06-29 2018-08-03 2018-07-23 2018-12-31 2020-01-31 Video Producer Fisheries FM-NORMA-165684-NC- Component 1: Sustainable Under Request for Single Stage - One RFQ / CA Fish Samples IDA / D0140 Management of Oceanic Post Open - International 24,888.41 Implementati 2020-03-30 2020-04-23 2020-05-15 2020-09-20 Quotations Envelope Testing Fisheries on FM-NORMA-140619-NC-DIR Component 1: Sustainable Request for Single Stage - One / World Tuna Day Organizer IDA / D0140 Management of Oceanic Prior Open - National 0.00 Canceled 2020-04-01 2020-04-27 2020-07-31 Quotations Envelope (YAP) Fisheries FM-NORMA-205035-NC- Component 1: Sustainable Pending Request for Single Stage - One RFQ / World Tuna Day IDA / D0140 Management of Oceanic Post Open - National 0.00 Implementati 2021-01-11 2021-02-06 2021-07-06 Quotations Envelope Organizer (Yap) Fisheries on FM-NORMA-205037-NC- Component 1: Sustainable Request for Single Stage - One RFQ / World Tuna Day IDA / D0140 Management of Oceanic Post Open - National 0.00 Canceled 2021-01-11 2021-02-06 2021-07-06 Quotations Envelope Organizer (Chuuk) Fisheries FM-NORMA-205038-NC- Component 1: Sustainable Pending Request for Single Stage - One RFQ / World Tuna Day IDA / D0140 Management of Oceanic Post Open - National 0.00 Implementati 2021-01-11 2021-02-06 2021-07-06 Quotations Envelope (Kosrae) Fisheries on FM-NORMA-205039-NC- Component 1: Sustainable Pending Request for Single Stage - One RFQ / World Tuna Day IDA / D0140 Management of Oceanic Post Open - National 0.00 Implementati 2021-01-13 2021-02-08 2021-07-08 Quotations Envelope Organizer (Pohnpei) Fisheries on Component 1: Sustainable Pending FM-NORMA-205047-NC- Request for Single Stage - One IDA / D0140 Management of Oceanic Post Open - National 0.00 Implementati 2021-01-22 2021-03-19 2021-09-15 RFQ / Satellite office lease Quotations Envelope Fisheries on FM-NORMA-231607-NC-DIR Component 1: Sustainable / World Tuna Day Organizer IDA / D0140 Management of Oceanic Post Direct Selection Direct 20,053.00 Signed 2021-04-29 2021-05-01 2021-04-30 2021-05-12 2021-05-11 2021-06-07 2021-07-01 (Chuuk) Fisheries CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FM-NORMA-46585-CS-INDV Component 1: Sustainable Individual / Information Management IDA / D0140 Management of Oceanic Post Consultant Open 0.00 Canceled 2018-04-02 2018-05-21 2018-06-11 2018-07-16 2020-07-05 System Manager Fisheries Selection FM-NORMA-67081-CS-INDV Component 1: Sustainable Individual / Local E-Reporting/E- IDA / D0140 Management of Oceanic Post Consultant Open 26,180.70 Signed 2019-01-07 2018-06-22 2019-02-25 2019-01-21 2019-03-18 2019-02-03 2019-04-22 2019-02-03 2020-04-17 Monitoring Coordinator Fisheries Selection Component 1: Sustainable Individual FM-NORMA-67068-CS-INDV IDA / D0140 Management of Oceanic Post Consultant Open 14,297.40 Completed 2018-08-15 2018-09-17 2018-10-03 2019-01-07 2018-10-24 2019-02-04 2018-11-28 2019-02-03 2019-11-23 2020-02-03 / License Assistant Fisheries Selection Component 1: Sustainable Individual FM-NORMA-50012-CS-INDV IDA / D0140 Management of Oceanic Post Consultant Open 28,657.20 Signed 2018-05-15 2018-04-19 2018-07-03 2018-08-27 2018-07-24 2018-09-14 2018-08-28 2019-09-14 2020-08-27 / E-Reporting Officer Fisheries Selection FM-NORMA-67045-CS-INDV Component 3: National Individual / PROP PROJECT IDA / D0140 Program Management, Post Consultant Open 265,800.20 Signed 2018-07-01 2015-08-30 2018-08-19 2017-07-18 2018-09-09 2017-08-31 2018-10-14 2015-08-13 2020-04-10 COORDINATOR Monitoring and Evaluation Selection Component 3: National Individual FM-NORMA-50337-CS-INDV IDA / D0140 Program Management, Post Consultant Open 27,999.45 Completed 2018-12-15 2015-11-02 2019-01-10 2017-01-30 2019-01-31 2017-02-19 2019-02-20 2017-02-19 2020-09-30 2020-02-01 / PROP Program Assistant Monitoring and Evaluation Selection Component 3: National Individual FM-NORMA-67085-CS-INDV IDA / D0140 Program Management, Post Consultant Open 29,674.95 Completed 2018-04-16 2018-07-19 2018-05-20 2018-05-25 2018-08-03 2018-06-29 2018-01-31 2019-06-24 2020-08-05 / PROP Accounts Officer Monitoring and Evaluation Selection FM-NORMA-67165-CS-INDV / Information Component 1: Sustainable Individual Technology/Information IDA / D0140 Management of Oceanic Post Consultant Open 150,000.00 Signed 2018-06-19 2018-02-06 2018-08-07 2018-10-26 2018-08-28 2020-01-29 2018-10-02 2020-03-20 2019-10-02 Management System (IT/IMS) Fisheries Selection Developer Component 1: Sustainable FM-NORMA-67067-CS-CDS IDA / D0140 Management of Oceanic Post Direct Selection Direct 3,500.00 Terminated 2018-07-01 2018-07-28 2018-07-11 2018-07-30 2018-09-04 2018-09-21 2018-11-30 / Observer Program Profiling Fisheries Component 1: Sustainable FM-NORMA-67075-CS-CDS IDA / D0140 Management of Oceanic Post Direct Selection Direct 5,000.00 Completed 2018-06-15 2018-04-16 2018-06-25 2018-04-30 2018-08-29 2018-05-21 2019-08-24 2020-01-01 / Fisheries Ambassador Fisheries Page 2 Component 1: Sustainable Individual FM-NORMA-67083-CS-INDV IDA / D0140 Management of Oceanic Post Consultant Open 0.00 Canceled 2018-08-01 2018-09-19 2018-10-10 2018-10-29 2019-10-25 / VDS/Fisheries Economist Fisheries Selection FM-NORMA-81703-CS-CDS Component 1: Sustainable / SENIOR FISHERIES IDA / D0140 Management of Oceanic Post Direct Selection Direct 54,839.46 Completed 2018-10-12 2018-10-03 2018-10-17 2018-10-29 2018-11-26 2020-04-29 2020-04-25 ECONOMIST for FSM NORMA Fisheries FM-NORMA-81707-CS-INDV Component 1: Sustainable Individual / VESSEL DAY SCHEME (VDS) IDA / D0140 Management of Oceanic Post Consultant Open 17,778.00 Signed 2018-10-15 2018-10-29 2018-12-19 2019-06-25 2019-01-09 2019-07-08 2019-02-13 2019-06-27 2020-08-14 ADMINISTRATOR Fisheries Selection FM-NORMA-49412-CS-INDV Component 1: Sustainable Individual / Communications Adviser for IDA / D0140 Management of Oceanic Post Consultant Open 0.00 Canceled 2018-08-15 2018-10-03 2018-10-24 2018-11-28 2019-05-27 communications strategy for Fisheries Selection public, industry and internally. Component 1: Sustainable Individual FM-NORMA-140616-CS- IDA / D0140 Management of Oceanic Post Consultant Open 21,886.80 Completed 2019-10-16 2017-08-21 2019-11-15 2019-02-28 2019-11-15 2019-03-21 2019-11-15 2019-04-05 2020-08-23 2020-12-31 INDV / CA Inspector (Kosrae) Fisheries Selection FM-NORMA-140617-CS- Component 1: Sustainable Individual INDV / CA INSPECTOR IDA / D0140 Management of Oceanic Post Consultant Open 21,886.80 Completed 2019-10-16 2017-08-21 2019-10-16 2019-02-10 2019-10-16 2019-04-04 2019-10-16 2019-04-04 2020-08-23 2020-04-27 (Pohnpei 1) Fisheries Selection FM-NORMA-140618-CS- Component 1: Sustainable Individual INDV / CA INSPECTOR IDA / D0140 Management of Oceanic Post Consultant Open 36,246.60 Completed 2019-10-16 2017-08-21 2019-10-16 2018-10-09 2019-10-16 2019-04-04 2019-10-16 2019-04-04 2020-08-23 2020-12-31 (Pohnpei 2) Fisheries Selection FM-NORMA-89603-CS-INDV Component 1: Sustainable Individual / Corporate Services Local IDA / D0140 Management of Oceanic Post Consultant Limited 0.00 Canceled 2019-12-16 2020-11-13 2019-12-31 2020-01-15 2020-02-09 2020-08-07 Consultant Fisheries Selection FM-NORMA-67087-CS-INDV Component 3: National Individual / PROP Procurement/Project IDA / D0140 Program Management, Post Consultant Open 37,381.89 Signed 2018-07-02 2019-07-01 2018-08-20 2019-07-04 2018-09-10 2019-07-09 2018-10-15 2019-07-12 2019-10-11 Officer Monitoring and Evaluation Selection FM-NORMA-105808-CS-CDS Component 1: Sustainable Individual / Fisheries Reporting IDA / D0140 Management of Oceanic Post Consultant Direct 0.00 Canceled 2020-02-16 2020-02-26 2020-03-04 2020-04-01 2020-05-01 Consultant Fisheries Selection FM-NORMA-105826-CS- Component 1: Sustainable Individual INDV / Competent Authority IDA / D0140 Management of Oceanic Prior Consultant Open 83,411.10 Signed 2019-03-13 2019-05-01 2019-05-22 2020-04-03 2019-06-26 2019-03-28 2020-08-26 Technical Officer Fisheries Selection FM-NORMA-105827-CS- Component 1: Sustainable Individual INDV / Competent Authority IDA / D0140 Management of Oceanic Prior Consultant Open 22,000.00 Under Review 2019-03-15 2019-05-03 2019-02-11 2019-05-24 2020-04-03 2019-06-28 2019-04-04 2020-08-23 Inspectors (Yap) Fisheries Selection FM-NORMA-105809-CS-CDS Component 1: Sustainable Individual / Communications IDA / D0140 Management of Oceanic Post Consultant Open 12,000.00 Completed 2020-02-15 2020-01-10 2020-03-06 2020-04-15 2020-03-13 2020-04-15 2020-03-23 2020-05-04 2020-09-19 2021-01-20 Plan/Strategy Consultant Fisheries Selection FM-NORMA-49410-CS-INDV Component 1: Sustainable Individual / Well being review of IDA / D0140 Management of Oceanic Post Consultant Direct 3,000.00 Completed 2020-01-15 2020-02-01 2020-02-04 2020-02-10 2020-02-08 2020-02-15 2020-02-17 2020-11-10 2020-03-18 2020-11-23 members of Observer Fisheries Selection Program Component 3: National Individual FM-NORMA-159070-CS- IDA / D0140 Program Management, Post Consultant Open 10,000.00 Signed 2020-02-15 2020-02-20 2020-03-12 2020-04-10 2020-04-02 2020-04-03 2020-04-22 2020-05-05 2020-09-30 INDV / Project Assistant Monitoring and Evaluation Selection FM-NORMA-180873-CS- Component 1: Sustainable Individual Under INDV / CA INSPECTOR IDA / D0140 Management of Oceanic Post Consultant Open 0.00 2020-06-24 2020-07-27 2020-07-17 2020-07-24 2020-07-28 2021-07-25 Implementation (Pohnpei 1) Fisheries Selection FM-NORMA-180874-CS- Component 3: National Individual INDV / Project Operations IDA / D0140 Program Management, Post Consultant Limited 5,000.00 Completed 2020-07-03 2020-09-29 2020-07-06 2020-10-07 2020-07-10 2020-11-27 2020-07-31 2021-01-06 2020-08-30 2021-02-26 Manual Development Monitoring and Evaluation Selection FM-NORMA-67082-CS-INDV Component 1: Sustainable Individual / Catch Documentation IDA / D0140 Management of Oceanic Post Consultant Open 0.00 Canceled 2018-05-15 2018-09-24 2018-07-03 2018-07-24 2018-08-28 2019-08-26 Scheme Officer Fisheries Selection FM-NORMA-182535-CS- Component 3: National Individual INDV / DLI Report Verification IDA / D0140 Program Management, Post Consultant Direct 0.00 Canceled 2020-10-01 2020-10-11 2020-11-01 2020-12-06 2021-06-04 Consultancy Monitoring and Evaluation Selection FM-NORMA-205031-CS- Component 1: Sustainable Individual Under INDV / Corporate Services IDA / D0140 Management of Oceanic Post Consultant Open 20,000.00 2020-11-20 2020-12-01 2021-01-08 2021-04-12 2021-01-29 2021-04-12 2021-03-05 2021-09-01 Implementation Consultant Fisheries Selection FM-NORMA-205033-CS- Component 1: Sustainable Individual Under INDV / Local Fisheries IDA / D0140 Management of Oceanic Post Consultant Open 0.00 2020-11-17 2020-12-01 2020-12-08 2020-12-15 2020-12-22 2021-09-30 Implementation Economist Fisheries Selection FM-NORMA-205041-CS- Component 1: Sustainable Individual INDV / Fisheries Compliance IDA / D0140 Management of Oceanic Post Consultant Open 65,000.00 Signed 2020-11-22 2020-12-02 2020-12-25 2021-04-12 2020-12-30 2021-04-12 2021-01-15 2021-05-12 2021-09-15 Consultant Fisheries Selection FM-NORMA-205043-CS- Component 1: Sustainable Individual Under INDV / Accounting System IDA / D0140 Management of Oceanic Post Consultant Open 15,000.00 2020-11-25 2020-12-01 2020-12-28 2021-04-12 2021-01-11 2021-04-12 2021-02-03 2021-08-02 Implementation Consultant Fisheries Selection FM-NORMA-205044-CS- Component 3: National Individual INDV / Implementation IDA / D0140 Program Management, Post Consultant Open 23,000.00 Signed 2020-11-29 2021-03-17 2021-01-17 2021-05-14 2021-02-07 2021-05-17 2021-03-14 2021-06-04 2021-06-12 Completion Report Consultant Monitoring and Evaluation Selection FM-NORMA-205045-CS- Component 1: Sustainable Individual Pending INDV / Observer Classification IDA / D0140 Management of Oceanic Post Consultant Open 0.00 2021-01-29 2021-03-03 2021-03-24 2021-04-28 2021-06-27 Implementation Study Fisheries Selection FM-NORMA-215242-CS- Component 3: National Individual INDV / DLI Verification Report IDA / D0140 Program Management, Post Consultant Open 8,000.00 Signed 2021-01-24 2021-02-04 2021-03-07 2021-05-14 2021-03-14 2021-05-18 2021-03-24 2021-06-04 2021-05-23 Consultancy Monitoring and Evaluation Selection Page 3 FM-NORMA-235444-CS- INDV / Information Technology/Information Management System (IT/IMS) Developer to deliver 4 fisheries systems (Observer Component 1: Sustainable Individual placement, Observer IDA / D0140 Management of Oceanic Post Consultant Direct 158,604.12 Signed 2021-05-20 2021-05-20 2021-05-21 2021-05-14 2021-05-21 2021-05-14 2021-06-11 2021-06-03 2021-08-31 Recruitment, Ports Fisheries Selection Management, Vessel Inspection) with corresponding data infrastructure along with IMS Policy and SOP. Page 4 PROCUREMENT PLAN (Textual Part) Project information: Afghanistan Naghlu Hydropower Rehabilitation Project (P132944) Project Implementation agency: DABS Date of the Procurement Plan: May 2017 Period covered by this Procurement Plan: December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Afghanistan : Naghlu Hydropower Rehabilitation Project PLAN General Information Country: Afghanistan Bank’s Approval Date of the Original Procurement Plan: 2017-05-15 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132944 GPN Date: Project Name: Naghlu Hydropower Rehabilitation Project Loan / Credit No: TF / A1691, TF / 14861 Da Afghanistan Breshna Sherkat Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AF-DABS-14178-CW-RFB / Procurement of WOrks for Component 1: Mechanical, Single Stage - One 2018-09- Security Upgrading and site TF / A1691 Electrical, and Post Request for Bids Open - National 900,000.00 0.00 Canceled 2017-06-03 2017-12-08 2017-06-08 2017-07-20 2017-08-19 2017-09-23 Envelope 22 utility improvement for Electromechanical Works Naghlu Dam Component 3: Environmental AF-DABS-31611-CW-RFQ / and Social Sustainability, Request for Single Stage - One 2018-06- Repair Work of Building TF / A1691 Post Limited 40,000.00 16,889.77 Completed 2017-10-19 2017-10-17 2017-12-14 2017-11-11 Project Management Support, Quotations Envelope 12 Dedicated for WB-PIU and Future Project Preparation AF-DABS-5686-CW-RFB / Component 1: Mechanical, Pending Single Stage - One 2018-10- construction of whorehouse at TF / A1691 Electrical, and Post Request for Bids Open - National 549,580.00 0.00 Implementat 2018-01-12 2018-01-17 2018-02-28 2018-03-30 2018-05-04 Envelope 31 Naghlu Hydro power station Electromechanical Works ion AF-DABS-14835-CW-RFB / Rehabilitation Unit#1 and Component 1: Mechanical, Under Single Stage - One 10,000,000.0 2018-10- overall of unit #3 with supply TF / A1691 Electrical, and Prior Request for Bids Open - International 0.00 Implementat 2018-01-12 2018-01-17 2018-02-28 2015-06-07 2018-03-30 2018-05-04 Envelope 0 31 and installation of spare parts Electromechanical Works ion at NHPS AF-DABS-43776-CW-RFB / Procurement of Works for Component 2: Dam Safety Single Stage - One 2019-03- Security Upgrading and site TF / A1691 and Power Generation Post Request for Bids Open - National 900,000.00 491,795.19 Signed 2017-12-10 2017-12-07 2017-12-15 2018-01-19 2018-01-15 2018-02-18 2018-02-24 2018-03-25 2018-04-16 Envelope 25 utility improvement for Capacity Improvement Naghlu Dam AF-DABS-59566-CW-RFQ / Component 3: Environmental Renovation Work of relay and and Social Sustainability, Request for Single Stage - One 2018-04- TF / A1691 Post Open - National 30,000.00 25,141.02 Completed 2018-01-25 2018-03-22 2018-05-12 Protection building Dedicated Project Management Support, Quotations Envelope 21 for World Bank-PIU and Future Project Preparation AF-DABS-79326-CW-RFB / Procurement of goods, Works and Services for Design, manufacture, supply, Component 3: Environmental installation, Testing and Social Sustainability, &commissioning for Single Stage - One 10,555,326. 2021-02- TF / A1691 Project Management Support, Prior Request for Bids Open - International 8,500,000.00 Signed 2018-10-15 2019-05-23 2018-10-20 2019-06-02 2018-12-01 2019-08-28 2018-12-31 2020-03-18 2019-02-04 2020-09-26 renovation, up gradation with Envelope 62 03 and Future Project complete replacement of Unit Preparation No. 1,2&3, switch-yard and construction of Admin building, and Ware house for DH AF-DABS-4510-CW-RFB / PROCUREMENT OF Component 1: Mechanical, Pending Design, Supply, Construction, Single Stage - One 2019-08- TF / A1691 Electrical, and Post Request for Bids Open - International 3,200,000.00 0.00 Implementat 2018-01-12 2018-01-17 2018-02-28 2018-03-30 2018-05-04 Erection, Testing and Envelope 02 Electromechanical Works ion Commissioning of 110/20kV Sarobi Substation AF-DABS-178060-CW-RFB / Component 3: Environmental procurement of design, and Social Sustainability, Under Single Stage - One 2021-10- supply, installation, testing TF / A1691 Project Management Support, Post Request for Bids Open - National 3,600,000.00 0.00 Implementat 2020-06-20 2021-02-23 2020-06-25 2021-04-20 2020-08-06 2021-05-19 2020-09-05 2020-10-10 Envelope 10 and commissioning of Tagab and Future Project ion Electrification (Phase I) Preparation AF-DABS-220317-CW-RFB / Procurement of Design, Component 1: Mechanical, Under Supply and installation of Single Stage - One 2022-09- TF / A1691 Electrical, and Post Request for Bids Open - International 1,000,000.00 0.00 Implementat 2021-02-20 2021-04-07 2021-02-25 2021-05-10 2021-04-08 2021-06-07 2021-05-08 2021-06-12 Goods for Electrification of Envelope 05 Electromechanical Works ion Sorobi district remaining villages of Naghlu HPP GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AF-DABS-19909-GO-RFQ / Component 3: Environmental Procurement of Small and and Social Sustainability, Request for Single Stage - One Heavy Duty Printers for TF / A1691 Project Management Support, Post Limited 47,500.00 29,638.72 Completed 2017-07-20 2017-07-12 2017-09-07 2017-07-25 2017-10-07 2017-08-21 Quotations Envelope Procurement directorate of and Future Project DABS Preparation AF-DABS-19919-GO-RFQ / Procurement/supply and Component 3: Environmental installation of Carpet for and Social Sustainability, Request for Single Stage - One flooring and cabin partitions TF / A1691 Project Management Support, Post Limited 41,000.00 17,850.17 Completed 2017-07-20 2017-07-26 2017-09-07 2017-08-15 2017-10-07 2017-08-19 Quotations Envelope for new location of and Future Project procurement directorate of Preparation DABS AF-DABS-19920-GO-RFQ / Procurement , Supply and installation of Networking Component 3: Environmental facilities (switches, modems, and Social Sustainability, Request for Single Stage - One wireless hubs..etc) ,Security TF / A1691 Project Management Support, Post Limited 25,000.00 30,209.04 Completed 2017-07-20 2017-07-12 2017-09-07 2017-07-19 2017-10-07 2017-07-22 Quotations Envelope cameras, CCTV and lockable and Future Project room facilities for Preparation procurement directorate of DABS Page 1 AF-DABS-14854-GO-RFQ / Component 3: Environmental Procurement of Office and Social Sustainability, Request for Single Stage - One TF / A1691 Post Open - National 50,000.00 21,492.51 Completed 2017-08-06 2017-10-01 2018-09-29 2017-12-01 2018-10-06 Furniture ( Disks,Chairs , Project Management Support, Quotations Envelope carpets ...etc) and Future Project Preparation AF-DABS-14852-GO-RFQ / Component 3: Environmental Procurement of Office and Social Sustainability, Request for Single Stage - One Equipment ( Printers TF / A1691 Project Management Support, Post Open - National 50,000.00 19,738.24 Completed 2017-05-16 2017-07-11 2016-11-16 2017-07-31 2016-11-20 Quotations Envelope ,Computers ,Laptops,..etc) for and Future Project PIU Preparation AF-DABS-19916-GO-RFQ / Procurement of office Component 3: Environmental Furniture ( Office table/disk , and Social Sustainability, Request for Single Stage - One meeting table , storing TF / A1691 Project Management Support, Post Limited 31,000.00 35,119.23 Completed 2017-07-20 2017-07-29 2017-09-07 2017-08-09 2017-09-30 2017-08-19 Quotations Envelope cabinets...etc) for and Future Project procurement directorate of Preparation DABS AF-DABS-19893-GO-RFQ / Component 3: Environmental Procurement of Laptop and and Social Sustainability, Request for Single Stage - One desktop Computers for TF / A1691 Project Management Support, Post Limited 27,000.00 34,814.34 Completed 2017-07-20 2017-09-17 2017-09-02 2017-10-10 2017-09-30 2017-11-12 Quotations Envelope Procurement directorate of and Future Project DABS Preparation AF-DABS-41885-GO-DIR / Component 1: Mechanical, Purchase of 7 items required TF / A1691 Electrical, and Post Direct Selection Direct 35,000.00 0.00 Canceled 2017-12-31 2018-01-05 2018-02-09 2018-03-11 for Unit#2 of Naghlu dam on Electromechanical Works emergency basis. AF-DABS-14174-GO-RFQ / Component 1: Mechanical, Procurement of 2 Nos of Request for Single Stage - One TF / A1691 Electrical, and Post Open - National 15,000.00 13,155.70 Completed 2018-01-15 2018-03-12 2018-02-06 2018-03-23 2018-03-12 Water Pumps for Emptying Quotations Envelope Electromechanical Works the drainage galary in Naghlu AF-DABS-14177-GO-RFB / Procurement and Supply of Component 1: Mechanical, Pending Construction Materials and Single Stage - One TF / A1691 Electrical, and Post Request for Bids Open - National 195,000.00 0.00 Implementati 2018-01-12 2018-01-17 2018-02-28 2018-03-30 2018-05-04 2018-10-31 Associated Services for Envelope Electromechanical Works on Installation of poles for sorobi Electrification AF-DABS-96068-GO-RFB / Procurement of Additional 2 Component 2: Dam Safety Single Stage - One nos Heavy duty Pumps for TF / A1691 and Power Generation Post Request for Bids Open - National 140,000.00 0.00 Canceled 2019-02-09 2019-02-14 2019-03-28 2019-04-27 2019-06-01 2019-09-29 Envelope drainage Gallery of Naghlu Capacity Improvement Hydro power Plant AF-DABS-109974-GO-RFQ / Component 2: Dam Safety Procurement of Echo sounder, Request for Single Stage - One TF / A1691 and Power Generation Post Open - National 35,000.00 29,530.27 Completed 2019-04-25 2019-06-20 2019-10-09 2019-07-20 2019-11-19 bathymetric surveys for Quotations Envelope Capacity Improvement Naghlu Dam AF-DABS-118555-GO-RFB / Procurement of Goods and Component 1: Mechanical, Under Services for supply, Single Stage - One TF / A1691 Electrical, and Prior Request for Bids Open - International 2,750,000.00 3,138,030.00 Implementati 2019-07-15 2020-02-18 2019-07-20 2020-06-14 2019-09-03 2020-07-15 2019-10-03 2021-03-10 2019-11-07 2020-05-05 installation, Testing, Envelope Electromechanical Works on Commissioning of overhauling Unit No#2 of Naghlu HPP AF-DABS-14220-GO-RFB / Component 1: Mechanical, Under Single Stage - One Procurement of Spare parts TF / A1691 Electrical, and Prior Request for Bids Open - International 6,000,000.00 0.00 Implementati 2019-09-07 2021-02-18 2019-09-14 2021-04-26 2019-10-26 2021-05-18 2019-11-25 2019-12-30 2020-12-29 Envelope for Naghlu Power Plant Electromechanical Works on AF-DABS-103190-GO-DIR / Procurement of Additional 2 Component 2: Dam Safety nos Heavy duty Pumps for TF / A1691 and Power Generation Post Direct Selection Direct 320,000.00 316,290.00 Completed 2019-03-10 2019-03-09 2019-03-15 2019-08-25 2019-04-19 2020-01-25 2019-10-16 2020-08-12 drainage Gallery of Naghlu Capacity Improvement Hydro power Plant AF-DABS-167154-GO-RFQ / Component 3: Environmental Pending Procurement of IT Equipment and Social Sustainability, Request for Single Stage - One TF / A1691 Post Limited 14,146.00 0.00 Implementati 2020-04-30 2020-06-25 2020-07-25 for Kajaki Phase II project Project Management Support, Quotations Envelope on Staff and Future Project Preparation Component 3: Environmental AF-DABS-167160-GO-RFQ / Pending and Social Sustainability, Request for Single Stage - One Procurement of Furniture for TF / A1691 Post Limited 5,200.00 0.00 Implementati 2020-04-30 2020-06-25 2020-07-25 Project Management Support, Quotations Envelope Kajaki Phase II project Staff on and Future Project Preparation AF-DABS-185830-GO-RFQ / Component 1: Mechanical, Procurement of one unit 8 Request for Single Stage - One TF / A1691 Electrical, and Post Open - National 6,000.00 6,334.58 Completed 2020-08-01 2020-09-26 2020-05-11 2020-10-03 2020-06-11 inch water pump for Naghlu Quotations Envelope Electromechanical Works HPP AF-DABS-192060-GO-RFQ / Component 2: Dam Safety Procurement of One unit Boat Request for Single Stage - One TF / A1691 and Power Generation Post Open - National 30,000.00 34,424.53 Signed 2020-10-01 2020-11-26 2020-11-23 2021-01-10 for survey of Naghlu Dam Quotations Envelope Capacity Improvement reservoir AF-DABS-14173-GO-RFB / Procurement of Design, Supply and installation of Component 1: Mechanical, Pending Single Stage - One Goods for Electrification of TF / A1691 Electrical, and Post Request for Bids Open - International 1,000,000.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-17 2021-01-16 2021-02-20 2022-05-16 Envelope Sorobi district remaining Electromechanical Works on villages upstream of Naghlu HPP Component 3: Environmental AF-DABS-197781-GO-RFQ / and Social Sustainability, Request for Single Stage - One Procurement of Deep well for TF / A1691 Post Open - National 35,000.00 29,957.49 Signed 2020-11-05 2020-12-31 2020-09-05 2021-01-30 Project Management Support, Quotations Envelope DABS Training Center and Future Project Preparation AF-DABS-197778-GO-DIR / Component 3: Environmental Procurement of Training Aid and Social Sustainability, Pending Equipment for Training Center TF / A1691 Project Management Support, Post Direct Selection Direct 516,320.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-10 2021-06-08 amended to DABS Staff and Future Project on Capacity Building project Preparation Page 2 Component 3: Environmental AF-DABS-197782-GO-RFB / Pending and Social Sustainability, Single Stage - One Procurement of Furniture for TF / A1691 Post Request for Bids Open - National 153,000.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-17 2021-01-16 2021-02-20 2021-06-20 Project Management Support, Envelope DABS Training Center on and Future Project Preparation AF-DABS-235140-GO-RFQ / Component 2: Dam Safety Pending Procurement of ArcGIS Request for Single Stage - One TF / A1691 and Power Generation Post Open - National 30,000.00 0.00 Implementati 2021-06-03 2021-07-29 2021-08-28 software for DABS Energy Quotations Envelope Capacity Improvement on Information Center NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AF-DABS-129893-NC-DIR / Component 3: Environmental Procurement of sediment, soil and Social Sustainability, TF / A1691 Post Direct Selection 20,000.00 10,590.00 Signed 2019-09-21 2019-09-12 2019-10-01 2019-09-30 2019-11-05 2019-10-19 2019-11-30 water and POPs tests of Project Management Support, Naghlu Dam and Future Project Preparation AF-DABS-133337-NC-RFB / Procurement of Sediment Component 2: Dam Safety Pending Single Stage - One Analysis and Selective TF / A1691 and Power Generation Prior Request for Bids Open - International 4,500,000.00 0.00 Implementati 2019-12-07 2019-12-12 2020-01-23 2020-02-22 2020-03-28 2021-09-19 Envelope Removal incl. UXOs for Capacity Improvement on Naghlu Dam AF-DABS-220313-NC-DIR / Component 3: Environmental Pending Procurement of sediment, soil and Social Sustainability, TF / A1691 Post Direct Selection Direct 10,000.00 0.00 Implementati 2021-02-21 2021-02-26 2021-04-02 2021-05-02 water and POPs tests of Project Management Support, on Naghlu Dam and Future Project Preparation CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AF-DABS-4497-CS-QCBS / Component 2: Dam Safety Consulting Services for Quality And Cost- TF / A1691 and Power Generation Prior Open - International 6,000,000.00 0.00 Canceled 2016-12-13 2017-01-03 2017-02-16 2017-03-16 2017-04-15 2017-05-20 2017-06-24 2019-06-24 Rehabilitation of Naghlu Based Selection Capacity Improvement Hydropower Dam AF-DABS-4498-CS-QCBS / Component 2: Dam Safety Consultancy Services for ESIA Quality And Cost- TF / A1691 and Power Generation Prior Open - International 1,263,100.00 649,993.00 Signed 2016-12-13 2017-01-03 2017-02-16 2018-09-27 2017-03-16 2018-12-01 2017-04-15 2019-07-17 2017-05-20 2020-02-03 2017-06-24 2020-04-19 2018-12-24 for Naghlu Dam Rehabilitation Based Selection Capacity Improvement Project AF-DABS-14188-CS-QCBS / Consultancy Services for Monitoring & Supervision of Component 1: Mechanical, Unit No.1 Rehabilitation, Quality And Cost- TF / A1691 Electrical, and Prior Open - International 2,400,000.00 0.00 Canceled 2017-05-01 2017-05-22 2017-07-05 2017-08-02 2017-09-01 2017-10-06 2017-11-10 2018-11-10 Overhaul and Maintenance of Based Selection Electromechanical Works Unit No.3 and Supervision of Spare Parts Contract No: DABS-94-ICB-008 AF-DABS-14834-CS-QCBS / consultancy Services of Component 1: Mechanical, Quality And Cost- training program for TF / A1691 Electrical, and Prior Open - International 1,759,642.00 0.00 Canceled 2017-06-20 2017-06-19 2017-07-11 2017-08-24 2017-08-24 2017-09-21 2017-10-21 2017-11-25 2017-12-30 2019-12-31 Based Selection operation and maintenance of Electromechanical Works Naghlu Dam Hydro power plant AF-DABS-14221-CS-QBS / Consultancy Services for Component 1: Mechanical, updating supervisory control Quality Based TF / A1691 Electrical, and Post Open - International 200,000.00 0.00 Canceled 2018-01-01 2018-01-22 2018-03-07 2018-04-04 2018-05-04 2018-06-03 2018-07-08 2019-07-08 software to make computer Selection Electromechanical Works displays readable in National Languages AF-DABS-14665-CS-QCBS / Component 3: Environmental Vocational Skill training for and Social Sustainability, Quality And Cost- upstream and downstream TF / A1691 Project Management Support, Prior Open - International 2,960,000.00 0.00 Canceled 2017-10-07 2017-10-28 2017-12-11 2018-01-08 2018-02-07 2018-03-14 2018-04-18 2021-04-21 Based Selection residence of Naghlu Power and Future Project Plant. Preparation Component 3: Environmental AF-DABS-14172-CS-QCBS / Consultant and Social Sustainability, Pending Consultancy Services for TF / 14861 Post Qualification Open - National 90,000.00 0.00 2017-10-07 2017-10-28 2017-12-11 2018-01-10 2018-02-14 2018-08-13 Project Management Support, Implementation Social Survey Selection and Future Project Preparation AF-DABS-92012-CS-QCBS / Consultancy Services for Component 3: Environmental ENVIRONMENTAL AND SOCIAL and Social Sustainability, Quality And Cost- IMPACT ASSESSMENT (ESIA) TF / A1691 Project Management Support, Prior Open - International 1,352,403.00 0.00 Under Review 2018-12-26 2019-03-26 2019-01-16 2019-04-01 2019-03-01 2019-03-29 2019-04-28 2019-06-02 2019-07-07 2020-07-06 Based Selection AND RESETTLEMENT ACTION and Future Project PLAN (RAP) For KAJAKI DAM Preparation PHASE-II AF-DABS-95594-CS-QCBS / Consultancy Services for Dam Component 2: Dam Safety Quality And Cost- Safety and Hydro mechanical TF / A1691 and Power Generation Prior Open - International 4,225,000.00 1,100,000.00 Signed 2019-02-16 2019-02-10 2019-03-09 2019-03-27 2019-04-22 2020-05-12 2019-05-20 2020-02-10 2019-06-19 2020-06-09 2019-07-24 2020-12-15 2019-08-28 2021-03-08 2021-02-26 Based Selection Works of Naghlu Hydro power Capacity Improvement plant area . AF-DABS-14649-CS-QCBS / Component 3: Environmental Environmental and Social and Social Sustainability, Quality And Cost- TF / A1691 Post Open - International 588,085.00 0.00 Canceled 2019-06-30 2019-07-21 2019-09-03 2019-10-01 2019-10-31 2019-12-05 2020-01-09 2021-01-08 Impact Assessment ( ESIA) for Project Management Support, Based Selection Component 2 and 3 and Future Project Preparation AF-DABS-116166-CS-QCBS / Consultancy Services for Component 1: Mechanical, Operation and Maintenance Quality And Cost- TF / A1691 Electrical, and Prior Open - International 1,213,040.00 0.00 Under Review 2019-06-01 2019-07-30 2019-06-22 2019-09-17 2019-08-05 2020-06-28 2019-09-02 2020-10-17 2019-10-02 2021-04-06 2019-11-06 2019-12-11 2021-08-02 Training Program for Naghlu Based Selection Electromechanical Works Hydro Electric Power Plant Personnel INDIVIDUAL CONSULTANTS Page 3 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Environmental AF-DABS-14679-CS-INDV / Individual and Social Sustainability, Hiring of Environmental TF / A1691 Post Consultant Open 150,000.00 73,250.00 Signed 2018-01-01 2018-07-15 2018-02-19 2018-12-10 2018-03-12 2018-12-23 2018-04-16 2019-01-01 2018-10-13 Project Management Support, Specialist Selection and Future Project Preparation Component 3: Environmental Individual AF-DABS-14680-CS-INDV / and Social Sustainability, TF / A1691 Post Consultant Open 150,000.00 0.00 Canceled 2017-05-09 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Hiring of Social Specialist Project Management Support, Selection and Future Project Preparation AF-DABS-14681-CS-INDV / Component 3: Environmental Individual Project Director for Naghlu and Social Sustainability, TF / A1691 Prior Consultant Open 240,000.00 0.00 Canceled 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-10-13 Hydro Power Rehabilitation Project Management Support, Selection Project (NHRP) and Future Project Preparation Component 3: Environmental AF-DABS-14684-CS-INDV / Individual and Social Sustainability, Hiring Knowledge and TF / A1691 Post Consultant Open 150,000.00 0.00 Canceled 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-10-13 Project Management Support, Learning Specialist Selection and Future Project Preparation Component 3: Environmental AF-DABS-14690-CS-INDV / Individual and Social Sustainability, Hiring of Monitoring and TF / A1691 Post Consultant Open 150,000.00 0.00 Canceled 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-10-13 Project Management Support, evaluation specialist Selection and Future Project Preparation Component 3: Environmental AF-DABS-14694-CS-INDV / Individual and Social Sustainability, Hiring of Communication TF / A1691 Post Consultant Open 150,000.00 0.00 Canceled 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-10-13 Project Management Support, Specialist Selection and Future Project Preparation Component 3: Environmental AF-DABS-14695-CS-INDV / Individual and Social Sustainability, Hiring of Civil Engineer TF / A1691 Post Consultant Open 120,000.00 0.00 Canceled 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-10-13 Project Management Support, Supervisor Selection and Future Project Preparation Component 3: Environmental AF-DABS-14726-CS-INDV / Individual and Social Sustainability, Hiring of Electrical and elector TF / A1691 Prior Consultant Open 120,000.00 0.00 Canceled 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2019-04-16 Project Management Support, Mechanical Supervisor Selection and Future Project Preparation Component 3: Environmental AF-DABS-14727-CS-INDV / Individual and Social Sustainability, Hiring of Financial TF / A1691 Post Consultant Open 150,000.00 0.00 Canceled 2017-05-11 2017-06-29 2017-06-29 2017-07-25 2020-12-31 Project Management Support, Management Specialist Selection and Future Project Preparation Component 3: Environmental AF-DABS-14837-CS-INDV / Individual and Social Sustainability, Pending Hiring of Project Technical TF / A1691 Prior Consultant Open 300,000.00 0.00 2017-05-11 2017-06-29 2017-07-20 2017-08-24 2019-01-01 Project Management Support, Implementation Advisor Selection and Future Project Preparation AF-DABS-14838-CS-INDV / Component 3: Environmental Individual Hiring of International and Social Sustainability, TF / A1691 Prior Consultant Open 240,000.00 0.00 Canceled 2017-08-01 2017-08-22 2017-09-19 2017-10-10 2017-11-14 2018-11-13 Procurement and Contract Project Management Support, Selection Management Advisor and Future Project Preparation Component 3: Environmental AF-DABS-14842-CS-INDV / Individual and Social Sustainability, Hiring of International Spare TF / A1691 Post Consultant Open 40,000.00 0.00 Canceled 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-08-13 Project Management Support, Part Advisor Selection and Future Project Preparation AF-DABS-14856-CS-INDV / Component 3: Environmental Hiring of International and Social Sustainability, Individual Electrical Engineer to support TF / A1691 Project Management Support, Prior Consultant Open 240,000.00 0.00 Canceled 2017-05-31 2017-07-19 2017-08-09 2017-09-13 2019-09-01 all World Bank funded Project and Future Project Selection as per the ToR Preparation AF-DABS-19922-CS-INDV / International Procurement and Component 3: Environmental Contract management and Social Sustainability, Individual specialist to Support Under TF / A1691 Project Management Support, Prior Consultant Open 360,000.00 0.00 2017-07-30 2019-01-27 2017-09-17 2017-10-08 2017-11-12 2019-11-12 Procurement Directorate of Implementation and Future Project Selection DABS in overall capacity Preparation building of Staff and provide on job training for Staff AF-DABS-14832-CS-INDV / Component 3: Environmental Hiring of International INDV and Social Sustainability, Individual consultant for Preparation of Pending TF / A1691 Project Management Support, Post Consultant Open 25,000.00 0.00 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-10-13 ToRs and RFPs for Vocational Implementation and Future Project Selection Training of Local People Preparation whom are closed to Reservoir AF-DABS-14839-CS-INDV / Component 3: Environmental Hiring of International INDV and Social Sustainability, Individual Consultant for Preparation of TF / A1691 Project Management Support, Post Consultant Open 24,000.00 0.00 Canceled 2018-01-01 2018-02-28 2018-03-28 2018-04-28 2018-10-24 Framework for EPP and O&M and Future Project Selection Plans Preparation Component 3: Environmental AF-DABS-14840-CS-INDV / Individual and Social Sustainability, Hiring of International TF / A1691 Post Consultant Open 60,000.00 0.00 Canceled 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2018-10-13 Project Management Support, Feasibility Study Adviser Selection and Future Project Preparation AF-DABS-14638-CS-INDV / Component 3: Environmental Individual International Hydrology and and Social Sustainability, Pending TF / A1691 Post Consultant Open 30,000.00 0.00 2017-05-09 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Flood Routing Expert (PTAP Project Management Support, Implementation Selection Member) and Future Project Preparation AF-DABS-14639-CS-INDV / Component 3: Environmental Individual Hiring of International and Social Sustainability, Pending TF / A1691 Post Consultant Open 30,000.00 0.00 2017-05-09 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Geology and Geo technical Project Management Support, Implementation Selection Expert (PTAP member) and Future Project Preparation AF-DABS-14671-CS-INDV / Component 3: Environmental Individual Hiring International and Social Sustainability, Pending TF / A1691 Post Consultant Open 162,000.00 0.00 2017-05-09 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Environmental expert (ESAP Project Management Support, Implementation Selection member) and Future Project Preparation Page 4 AF-DABS-14676-CS-INDV / Component 3: Environmental Individual Hiring of International Social and Social Sustainability, Pending TF / A1691 Post Consultant Open 162,000.00 0.00 2017-05-09 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Development Expert ( ESAP Project Management Support, Implementation Selection Member) and Future Project Preparation AF-DABS-14851-CS-INDV / Component 3: Environmental Hiring of International INDV and Social Sustainability, Individual consultant for Preparing of TF / A1691 Project Management Support, Post Consultant Open 40,000.00 0.00 Canceled 2017-05-11 2017-06-29 2017-07-20 2017-08-24 2018-02-20 ToRs and RFPs for training and Future Project Selection program and software Preparation translation by IC AF-DABS-14187-CS-INDV / Component 1: Mechanical, Individual Hiring of International Pending TF / A1691 Electrical, and Post Consultant Direct 130,000.00 0.00 2017-05-01 2017-05-11 2017-06-01 2017-07-06 2018-01-02 Consultant ( International Site Implementation Electromechanical Works Selection Supervisor) For NHRP AF-DABS-14624-CS-INDV / Component 3: Environmental Individual International Dam Design and and Social Sustainability, Pending TF / A1691 Post Consultant Open 135,000.00 0.00 2017-05-09 2017-06-27 2017-07-18 2017-08-22 2018-02-18 construction expert (PTAP Project Management Support, Implementation Selection Member) and Future Project Preparation AF-DABS-14625-CS-INDV / Component 3: Environmental Individual International Hydraulic and and Social Sustainability, Pending TF / A1691 Post Consultant Open 120,000.00 0.00 2017-09-01 2017-10-20 2017-11-10 2017-12-15 2018-06-13 sidemen Expert ( PTAP Project Management Support, Implementation Selection Member) and Future Project Preparation AF-DABS-14626-CS-INDV / Component 3: Environmental Individual Hiring of International Elector and Social Sustainability, Pending TF / A1691 Post Consultant Open 60,000.00 0.00 2017-05-09 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Mechanical Expert (PTAP Project Management Support, Implementation Selection Member) and Future Project Preparation AF-DABS-14621-CS-INDV / Component 3: Environmental Individual Team Leader cum Hydro and Social Sustainability, Pending TF / A1691 Post Consultant Open 150,000.00 0.00 2017-05-09 2017-06-27 2017-07-18 2017-08-22 2019-02-13 Power Erection Expert Project Management Support, Implementation Selection (Mechanical Engineer) for and Future Project NHRP Preparation AF-DABS-70279-CS-CDS / Consultancy Services for Component 3: Environmental ENVIRONMENTAL AND SOCIAL and Social Sustainability, IMPACT ASSESSMENT (ESIA) TF / A1691 Project Management Support, Prior Direct Selection Direct 2,265,822.00 0.00 Canceled 2018-07-31 2018-08-10 2018-10-14 2019-10-14 AND RESETTLEMENT ACTION and Future Project PLAN (RAP) For KAJAKI DAM Preparation PHASE-II (MEW) Component 3: Environmental AF-DABS-70281-CS-INDV / Individual and Social Sustainability, INTERNATIONAL SOCIAL TF / A1691 Post Consultant Open 75,000.00 0.00 Canceled 2018-08-01 2018-07-23 2018-09-19 2018-10-10 2018-11-14 2019-02-12 Project Management Support, SAFEGUARD SPECIALIST Selection and Future Project Preparation AF-DABS-70283-CS-INDV / Component 3: Environmental Individual INTERNATIONAL and Social Sustainability, TF / A1691 Prior Consultant Open 240,000.00 0.00 Canceled 2018-08-01 2018-09-29 2018-09-19 2018-10-10 2018-11-14 2019-07-12 ENVIRONMENTAL SAFEGUARD Project Management Support, Selection SPECIALIST and Future Project Preparation AF-DABS-128996-CS-INDV / Component 3: Environmental Individual Hiring of International Site and Social Sustainability, TF / A1691 Post Consultant Direct 30,000.00 38,860.00 Signed 2019-09-07 2019-09-22 2019-09-17 2019-11-19 2019-10-08 2020-02-24 2019-11-12 2020-10-30 2020-05-10 Supervisor cum governor Project Management Support, Selection systems (Andritz) engineer and Future Project Preparation AF-DABS-128998-CS-INDV / Component 3: Environmental Individual Hiring of International Site and Social Sustainability, TF / A1691 Post Consultant Direct 30,000.00 36,360.00 Signed 2019-09-07 2019-09-22 2019-09-17 2019-11-19 2019-10-08 2020-07-05 2019-11-12 2020-09-30 2020-05-10 Supervisor Short Term Control Project Management Support, Selection (Metso) Systems Engineer and Future Project Preparation Component 3: Environmental AF-DABS-128999-CS-INDV / Individual and Social Sustainability, Hiring of International TF / A1691 Post Consultant Open 150,000.00 107,900.00 Signed 2019-09-07 2019-09-29 2019-10-11 2020-02-01 2019-11-01 2020-03-26 2019-12-06 2020-04-25 2020-12-05 Project Management Support, electrical systems engineer Selection and Future Project Preparation AF-DABS-129093-CS-INDV / Component 3: Environmental Individual Hiring of International and Social Sustainability, Under TF / A1691 Post Consultant Open 100,000.00 0.00 2019-09-14 2020-02-04 2019-10-18 2019-11-08 2019-12-13 2020-12-12 Hydrology and flood routing Project Management Support, Implementation Selection Expert for (PTAP Panel) and Future Project Preparation AF-DABS-129897-CS-INDV / Component 3: Environmental Individual Hiring of International Electro and Social Sustainability, Under TF / A1691 Post Consultant Open 110,000.00 0.00 2019-09-21 2020-02-04 2019-10-25 2019-11-15 2019-12-20 2020-12-19 Mechanical Engineering Project Management Support, Implementation Selection Expert for (PTAP Panel) and Future Project Preparation AF-DABS-128993-CS-INDV / Component 3: Environmental Individual Hiring of International Site and Social Sustainability, TF / A1691 Post Consultant Direct 30,000.00 30,720.00 Signed 2019-09-07 2019-09-24 2019-09-17 2019-11-19 2019-10-08 2020-02-24 2019-11-12 2020-04-25 2020-05-10 Supervisor cum excitation Project Management Support, Selection systems engineer and Future Project Preparation AF-DABS-129084-CS-INDV / Component 3: Environmental Individual Hiring of International Social and Social Sustainability, TF / A1691 Post Consultant Open 110,000.00 23,680.00 Signed 2019-09-14 2020-01-28 2019-11-02 2020-06-10 2019-11-23 2020-08-20 2019-12-28 2020-11-01 2020-12-27 Development Expert for (ESAP Project Management Support, Selection Panel) and Future Project Preparation AF-DABS-129090-CS-INDV / Component 3: Environmental Individual Hiring of International Dam and Social Sustainability, Under TF / A1691 Post Consultant Open 110,000.00 0.00 2019-09-14 2020-01-28 2019-10-18 2019-11-08 2019-12-13 2020-12-12 Designs and Construction Project Management Support, Implementation Selection Expert for (PTAP Panel) and Future Project Preparation AF-DABS-129895-CS-INDV / Component 3: Environmental Individual Hiring of International and Social Sustainability, Under TF / A1691 Post Consultant Open 100,000.00 0.00 2019-09-21 2020-02-04 2019-10-25 2019-11-15 2019-12-20 2020-12-19 Geology and Geo-technical Project Management Support, Implementation Selection Expert for (PTAP Panel) and Future Project Preparation AF-DABS-129899-CS-INDV / Component 3: Environmental Individual Hiring of International and Social Sustainability, TF / A1691 Post Consultant Open 150,000.00 118,400.00 Signed 2019-09-14 2019-09-26 2019-11-02 2019-12-30 2019-11-23 2020-06-22 2019-12-28 2021-01-05 2020-12-27 Technical Advisor for World Project Management Support, Selection Bank Funded projects at DABS and Future Project Preparation AF-DABS-129080-CS-INDV / Component 3: Environmental Individual Hiring of International and Social Sustainability, TF / A1691 Post Consultant Open 100,000.00 25,680.00 Signed 2019-09-14 2020-01-28 2019-10-18 2020-06-13 2019-11-08 2020-08-20 2019-12-13 2020-11-01 2020-12-12 Environmental Expert for Project Management Support, Selection (ESAP Panel) and Future Project Preparation Page 5 AF-DABS-179951-CS-INDV / Component 3: Environmental Hiring of International Dam and Social Sustainability, Individual Under Design and Construction TF / A1691 Project Management Support, Post Consultant Open 66,900.00 0.00 2020-06-27 2020-06-25 2020-08-15 2020-09-05 2020-10-10 2021-10-10 Implementation Specialist for Kajaki Phase II and Future Project Selection PTAP member Preparation AF-DABS-179952-CS-INDV / Component 3: Environmental Hiring of International and Social Sustainability, Individual Under Hydrology / Hydraulic TF / A1691 Project Management Support, Post Consultant Open 66,900.00 0.00 2020-06-27 2020-06-25 2020-08-15 2020-09-05 2020-10-10 2021-10-10 Implementation Specialist for Kajaki Phase II and Future Project Selection PTAP Member Preparation AF-DABS-179953-CS-INDV / Component 3: Environmental Hiring of International and Social Sustainability, Individual Under Geology / Geotechnical TF / A1691 Project Management Support, Post Consultant Open 66,900.00 0.00 2020-06-27 2020-06-29 2020-08-15 2020-09-05 2020-10-10 2021-10-10 Implementation Specialist for Kajaki Phase II and Future Project Selection PTAP Member Preparation AF-DABS-179954-CS-INDV / Component 3: Environmental Hiring of International Hydro / and Social Sustainability, Individual Under Electromechanical Specialist TF / A1691 Project Management Support, Post Consultant Open 66,900.00 0.00 2020-06-30 2020-06-29 2020-08-18 2020-09-08 2020-10-13 2021-10-13 Implementation for Kajaki Phase II PTAP and Future Project Selection Member Preparation AF-DABS-179955-CS-INDV / Component 3: Environmental Hiring of International and Social Sustainability, Individual Under Environmental Safeguard TF / A1691 Project Management Support, Post Consultant Open 66,900.00 0.00 2020-07-04 2020-06-29 2020-08-22 2020-09-12 2020-10-17 2021-10-17 Implementation Specialist for Kajaki Phase II and Future Project Selection ESAP panel member Preparation AF-DABS-179956-CS-INDV / Component 3: Environmental Hiring of International Social and Social Sustainability, Individual Under Development Specialist for TF / A1691 Project Management Support, Post Consultant Open 66,900.00 0.00 2020-07-04 2020-06-29 2020-08-22 2020-09-12 2020-10-17 2021-10-17 Implementation Kajaki Phase II ESAP panel and Future Project Selection Member Preparation AF-DABS-209414-CS-INDV / Component 3: Environmental Hiring of International and Social Sustainability, Individual Under Environmental Safeguard TF / A1691 Project Management Support, Post Consultant Open 162,000.00 0.00 2020-12-26 2020-12-30 2021-02-13 2021-03-06 2021-04-10 2021-07-09 Implementation Specialist for Kajaki Phase 2 and Future Project Selection Project Preparation AF-DABS-209415-CS-INDV / Component 3: Environmental Individual Hiring of International Social and Social Sustainability, Under TF / A1691 Post Consultant Open 162,000.00 0.00 2020-12-26 2020-12-30 2021-02-13 2021-03-06 2021-04-10 2021-07-09 Safeguard Specialist for Kajaki Project Management Support, Implementation Selection Phase 2 Project and Future Project Preparation AF-DABS-209416-CS-INDV / Component 3: Environmental Hiring of International Quality and Social Sustainability, Individual Under Assurance Hydro Mechanical TF / A1691 Project Management Support, Post Consultant Open 162,000.00 0.00 2020-12-31 2021-01-21 2021-02-18 2021-03-11 2021-04-15 2021-07-14 Implementation Engineer for Kajaki Phase 2 and Future Project Selection Project Preparation Page 6 PE Modernization of WSS Services (P157043) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 26-July-2018 July 9, 2010 PROCUREMENT Peru : Modernization of Water Supply and Sanitation Services PLAN General Information Country: Peru Bank’s Approval Date of the Original Procurement Plan: 2019-07-18 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157043 GPN Date: 2019-10-31 Project Name: Modernization of Water Supply and Sanitation Services Loan / Credit No: IBRD / 88990 T Executing Agency(ies): he Technical Organization for the Administration of WSS Services WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SDO N° 0001-2020-MVCS- Improving Governance of Single Stage - One UE003-OTASS / Servidor IBRD / 88990 Water Supply and Sanitation Post Request for Bids Open - National 75,757.58 0.00 Canceled 2020-04-20 2020-04-26 2020-06-02 2020-06-08 2020-06-26 2020-07-31 Envelope VMCS Service Providers SDO N° 0002-2020-MVCS- Improving Governance of UE003-OTASS / Adquisición Single Stage - One IBRD / 88990 Water Supply and Sanitation Post Request for Bids Open - National 185,206.06 0.00 Canceled 2020-04-20 2020-04-26 2020-06-02 2020-06-08 2020-06-26 2020-07-31 de otros equipos de apoyo a Envelope Service Providers las EPS y OSN SDC N° 005-2020-MVCS- General Project Request for Single Stage - One IBRD / 88990 Post Limited 33,147.27 0.00 Canceled 2020-05-13 2020-05-27 2020-06-26 UE003-OTASS / Licencia CAD Administration Quotations Envelope SDC N° 006-2020-MVCS- General Project Request for Single Stage - One IBRD / 88990 Post Limited 12,765.45 0.00 Canceled 2020-05-20 2020-06-03 2020-06-30 UE003-OTASS / Licencia S10 Administration Quotations Envelope SDC N° 007-2020-MVCS- General Project Request for Single Stage - One UE003-OTASS / Licencia MS IBRD / 88990 Post Limited 18,593.94 0.00 Canceled 2020-05-08 2020-05-20 2020-06-19 Administration Quotations Envelope Project SDC N° 008-2020-MVCS- General Project Request for Single Stage - One IBRD / 88990 Post Limited 46,484.85 0.00 Canceled 2020-05-11 2020-05-29 2020-07-30 UE003-OTASS / Camioneta Administration Quotations Envelope SDO N° 0003-2020-MVCS- General Project Single Stage - One UE003-OTASS / IBRD / 88990 Post Request for Bids Open - National 102,911.82 0.00 Canceled 2020-05-04 2020-05-09 2020-06-20 2020-06-25 2020-07-15 2020-08-17 Administration Envelope Videoconferencia SDC N° 09-2020-MVCS- General Project Request for Single Stage - One UE003-OTASS / Licencia Arc IBRD / 88990 Post Limited 49,850.00 0.00 Canceled 2020-05-04 2020-05-14 2020-05-29 Administration Quotations Envelope Gis SDC N° 010-2020-MVCS- General Project Request for Single Stage - One IBRD / 88990 Post Limited 4,290.91 0.00 Canceled 2020-05-07 2020-05-18 2020-05-26 UE003-OTASS / Lap Top Administration Quotations Envelope SDC N° 011-2020-MVCS- General Project Request for Single Stage - One UE003-OTASS / IBRD / 88990 Post Limited 25,030.30 0.00 Canceled 2020-05-05 2020-05-18 2020-05-29 Administration Quotations Envelope Computadoras de ingenieria SDC N° 012-2020-MVCS- General Project Request for Single Stage - One UE003-OTASS / IBRD / 88990 Post Limited 42,909.09 0.00 Canceled 2020-05-06 2020-05-18 2020-05-28 Administration Quotations Envelope Computadoras de escritorio NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SDC 001 / SERVICIO DE CONTRATACIÓN Improving Governance of CONVOCATORIA Y ESCENARIO Request for Single Stage - One IBRD / 88990 Water Supply and Sanitation Post Limited 21,060.00 19,161.09 Signed 2020-02-12 2020-02-17 2020-02-18 2020-02-25 2020-04-03 PRINCIPAL IMPLEMENTACIÓN Quotations Envelope Service Providers PRIMER ENCUENTRO AGUA TODAS SDC 002 / SERVICIO DE CONTRATACIÓN Improving Governance of ACREDITACIÓN, PROTOCOLO, Request for Single Stage - One IBRD / 88990 Water Supply and Sanitation Post Limited 30,394.00 23,298.76 Signed 2020-02-12 2020-02-17 2020-02-18 2020-02-25 2020-04-03 SEGURIDAD Y CATERING Quotations Envelope Service Providers IMPLEMENTACION DEL PRIMER ENCUENTRO AGUAS TODAS SDC 003 / SERVICIO DE Improving Governance of CONTRATACION GESTION DE Request for Single Stage - One IBRD / 88990 Water Supply and Sanitation Post Limited 8,400.00 7,372.85 Signed 2020-02-12 2020-02-17 2020-02-18 2020-02-28 2020-04-03 PRENSA PRIMER ENCUENTRO Quotations Envelope Service Providers AGUA TODAS SDC N 015 / SERVICIO DE CONTRATACIÓN DEL SISTEMA Improving Governance of STREAMING PARA LA Request for Single Stage - One IBRD / 88990 Water Supply and Sanitation Post Limited 7,575.76 6,382.38 Signed 2020-06-09 2020-06-26 2020-06-22 2020-06-19 2020-07-13 TRANSMISIÓN VIRTUAL DEL Quotations Envelope Service Providers “PRIMER ENCUENTRO AGUAS TODAS SDC 16 / CONTRATACIÓN DEL SERVICIO DE GESTIÓN DE PAUTA PUBLICITARIA Y MONITOREO Y REPORTE DE Improving Governance of Request for Single Stage - One INDICADORES PARA REDES IBRD / 88990 Water Supply and Sanitation Post Limited 24,242.22 22,215.68 Signed 2020-08-05 2020-10-29 2020-08-13 2020-11-02 2021-04-30 Quotations Envelope SOCIALES FACEBOOK Y Service Providers WHATSAPP EN EL MARCO DE LA CAMPANA GUERREROS/AS POR EL AGUA Page 1 SDC 17 / CONTRATACIÓN DEL SERVICIO DE PRODUCCION Y DIFUSION DE Improving Governance of Request for Single Stage - One SPOT RADIALES EN EMISORAS IBRD / 88990 Water Supply and Sanitation Post Limited 30,303.03 27,762.61 Signed 2020-08-05 2020-10-27 2020-08-13 2020-11-02 2021-04-30 Quotations Envelope LOCALES Y REGIONALES EN EL Service Providers MARCO DE LA CAMPANA GUERREROS/AS POR EL AGUA CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1.3.6.1 / Contratación de Firma “Programa de Capacitación Especializado Improving Governance of para el Desarrollo de Quality And Cost- IBRD / 88990 Water Supply and Sanitation Post Open - International 817,621.00 0.00 Canceled 2020-01-06 2020-02-17 2020-01-12 2020-02-07 2020-03-06 2020-04-05 2020-05-10 2020-06-14 2021-06-14 Capacidades de Gestión, Based Selection Service Providers Administración y Operación de Empresas Prestadoras de Servicios de Saneamiento" SDP N° 001-2020-MVCS- UE003-OTASS / Contratación de Firma “Programa de Capacitación Especializado Improving Governance of Quality And Cost- para el Desarrollo de IBRD / 88990 Water Supply and Sanitation Prior Open - International 1,220,884.79 0.00 Canceled 2020-02-28 2020-03-02 2020-03-01 2020-04-14 2020-05-12 2020-06-11 2020-07-16 2020-08-20 2021-08-20 Based Selection Capacidades de Gestión, Service Providers Administración y Operación de Empresas Prestadoras de Servicios de Saneamiento" SDP N° 0001-2020-MVCS- UE003-OTASS / Contratación de Firma “Programa de Capacitación Especializado Improving Governance of Quality And Cost- Under para el Desarrollo de IBRD / 88990 Water Supply and Sanitation Prior Open - National 1,220,884.79 0.00 2020-03-05 2020-03-05 2020-03-08 2020-07-14 2020-04-21 2020-09-23 2020-05-19 2020-10-26 2020-06-18 2020-12-22 2020-07-23 2020-08-27 2021-08-27 Based Selection Implementation Capacidades de Gestión, Service Providers Administración y Operación de Empresas Prestadoras de Servicios de Saneamiento" SDP N° 0005-2020-MVCS- Improving Governance of UE003-OTASS / Operatividad Quality And Cost- IBRD / 88990 Water Supply and Sanitation Post Open - National 86,363.64 0.00 Canceled 2020-06-01 2020-06-07 2020-06-30 2020-07-30 2020-08-04 2020-08-13 2020-08-31 2021-02-26 de la Estrategia del ¨Programa Based Selection Service Providers de Modernización SDP N° 0006-2020-MVCS- Improving Governance of Consultant UE003-OTASS / Pagina Web IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 10,606.06 0.00 Canceled 2020-05-01 2020-05-10 2020-06-24 2020-06-26 2020-07-10 2020-08-10 UE 003 Service Providers Selection SDP N° 0002-2020-MVCS- UE003-OTASS / Revisíon del Marco normativo para elaborar y aplicar una escala Improving Governance of Consultant salarial y una política salarial IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 23,636.36 0.00 Canceled 2020-04-20 2020-04-26 2020-05-13 2020-05-28 2020-06-01 2020-08-03 integral en las EPS en RAT; y Service Providers Selection elaboración de propuesta de Política salarial integral para las EPS en RAT. SDP N° 0004-2020-MVCS- UE003-OTASS / Elaboración Improving Governance of Consultant de un plan de desarrollo y IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 18,181.82 0.00 Canceled 2020-04-20 2020-04-26 2020-05-13 2020-05-28 2020-06-01 2020-08-31 línea de carrera para el Service Providers Selection personal en las EPS. SDP N° 0007-2020-MVCS- UE003-OTASS / Servicio de Consultoria en el análisis y la elaboración del marco normativo para el diseño e Improving Governance of Quality And Cost- implementacion del sistema IBRD / 88990 Water Supply and Sanitation Post Open - National 45,250.78 0.00 Canceled 2020-08-17 2020-08-19 2020-08-22 2020-09-17 2020-10-27 2020-10-30 2020-11-13 2020-12-07 2021-05-07 Based Selection salarial integral, evaluación de Service Providers rendimiento, plan de desarrollo y línea de carrera para las Empresas Prestadoras de Servicios de Sanea SDP N° 0003-2020-MVCS- UE003-OTASS / Servicio de Improving Governance of Consultoria para el Diseño de Quality And Cost- IBRD / 88990 Water Supply and Sanitation Post Open - National 167,888.85 0.00 Canceled 2020-08-17 2020-08-19 2020-08-22 2020-09-17 2020-10-27 2020-10-30 2020-11-13 2020-12-07 2021-04-07 un Sistema Salarial Integral Based Selection Service Providers para las Empresas Prestadoras de Servicios de Sanea SDP N° 0008-2020-MVCS- UE003-OTAS / Servicio de Consultoria para el Diseño de Improving Governance of un Sistema de Evaluación del Quality And Cost- IBRD / 88990 Water Supply and Sanitation Post Open - National 107,182.56 0.00 Canceled 2020-08-17 2020-08-19 2020-08-22 2020-09-17 2020-10-27 2020-10-30 2020-11-13 2020-12-07 2021-03-22 Rendimiento, Plan de Based Selection Service Providers desarrollo y Linea de Carrera para las Empresas Prestadoras de Servicios Municipales SDP N° 0009-2020-MVCS- UE003-OTASS / Servicio de Consultoría para el Diseño de Improving Governance of Consultant un Sistema Salarial Integral IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 167,888.85 161,814.51 Signed 2020-09-15 2020-09-25 2020-09-22 2020-11-03 2020-10-07 2020-11-26 2020-10-29 2021-02-24 2020-11-04 2021-03-09 2021-03-05 para las Empresas Prestadoras Service Providers Selection de Servicios de Saneamiento Municipales SDP N° 0010-2020-MVCS- UE003-OTASS / Servicio de Consultoría para el Diseño de Improving Governance of Consultant un Sistema de Evaluación del IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 107,182.56 100,235.38 Signed 2020-09-15 2020-09-25 2020-09-22 2020-11-03 2020-10-07 2020-11-28 2020-10-29 2021-03-22 2020-11-04 2021-03-30 2021-02-17 Rendimiento, Plan de Service Providers Selection desarrollo y Línea de Carrera para las Empresas Prestadoras de Servicios Municipales Page 2 PE-OTASS-211887-CS-LCS / Auditoría Financiera al Programa “Modernización de la Prestación de los Servicios de Agua Potable y Improving Governance of Saneamiento de las EPS Least Cost Under IBRD / 88990 Water Supply and Sanitation Post Open - National 333,880.73 0.00 2021-01-08 2021-03-12 2021-01-29 2021-03-14 2021-03-25 2021-04-11 2021-05-11 2021-06-15 2021-07-20 2022-01-16 EMAPACOP, SEDACUSCO, Selection Implementation Service Providers SEDAPAR, SEMAPA BARRANCA, EMAPA HUARAL Y EMAPA HUACHO” financiado con “Contrato de Préstamo No 8899-PE” PE-OTASS-225691-CS-QCBS / Contratación de una solución informática mediante un software integrado con los Improving Governance of Quality And Cost- Under procesos administrativos, IBRD / 88990 Water Supply and Sanitation Prior Open - International 6,863,774.28 0.00 2021-03-22 2021-06-01 2021-04-12 2021-05-26 2021-06-23 2021-07-23 2021-08-27 2021-10-01 2022-10-01 Based Selection Implementation comerciales, operacionales y Service Providers corporativos, alineado al modelo propuesto por OTASS - PROYECTO GO PE-OTASS-228498-CS-CQS / consultoría para asesoría de la Improving Governance of Consultant formulación de reglas, Under IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 20,000.00 0.00 2021-04-20 2021-04-26 2021-05-11 2021-06-24 2021-07-24 2021-08-28 2021-09-06 disposiciones y procedimiento Implementation Service Providers Selection especial, Articulo 103 del D.L. N°1280 PE-OTASS-229755-CS-CQS / Análisis de la implementación Improving Governance of Consultant Under de la reforma sectorial en IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 67,429.00 0.00 2021-05-03 2021-05-14 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Implementation servicios de saneamiento Service Providers Selection 2016-2021 PE-OTASS-229756-CS-CQS / Diseño de cursos de Improving Governance of Consultant capacitación para el Pending IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 40,457.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 fortalecimiento de Implementation Service Providers Selection capacidades de funcionarios de las EPS y del sector. PE-OTASS-229757-CS-CQS / Elaboración de propuesta para Improving Governance of Consultant la actualización de la Política IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 26,971.00 0.00 Canceled 2021-05-03 2021-04-26 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Nacional de Saneamiento Service Providers Selection (PNS). PE-OTASS-229758-CS-CQS / Elaboración de una nueva Improving Governance of Consultant Pending propuesta de reestructuración IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 16,857.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Implementation del esquema de Gobierno Service Providers Selection Corporativo para las EPS. PE-OTASS-229759-CS-CQS / Estudio de análisis de la Improving Governance of Consultant Pending problemática de las IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 25,286.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Implementation inversiones de las EPS Service Providers Selection medianas y grandes. PE-OTASS-229760-CS-CQS / Diseño y validación del marco normativo para regulación, Improving Governance of Consultant Pending supervisión y sanción de IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 43,896.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Implementation prestadores de pequeñas Service Providers Selection ciudades y comunidades rurales. PE-OTASS-229761-CS-CQS / Diseño e implementación de Improving Governance of Consultant un programa de capacitación Pending IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 87,657.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 para el personal de los Implementation Service Providers Selection Centros de Atención al Ciudadano (CAC) del PNSU PE-OTASS-229762-CS-CQS / Estudio de factibilidad para la implementación de "Call Improving Governance of Consultant Pending Centers" de alcance regional o IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 57,143.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Implementation macroregional, para las EPS Service Providers Selection EMAPACOP, SEDACUSCO, SEDAPAR y EMAPA HUACHO PE-OTASS-229763-CS-CQS / Estudio de factibilidad para la implementación de Improving Governance of Consultant "Laboratorios de Control de Pending IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 57,143.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Calidad" de alcance regional o Implementation Service Providers Selection macroregional, para las EPS EMAPACOP, SEDACUSCO, SEDAPAR y EMAPA HUACHO. PE-OTASS-229764-CS-CQS / Estudio de factibilidad para la implementación de "Bancos de Improving Governance of Consultant Medidores" de alcance Pending IBRD / 88990 Water Supply and Sanitation Post Qualification Open - National 57,143.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 regional o macroregional, Implementation Service Providers Selection para las EPS EMAPACOP, SEDACUSCO, SEDAPAR y EMAPA HUACHO. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 1.1.1.1-CI-8899 / Diagnóstico de la situación actual de los sistemas de información de prestadores Improving Governance of Individual urbanos y rurales y propuesta IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 30,303.00 0.00 Canceled 2019-09-02 2019-09-07 2019-09-28 2019-11-02 2019-12-17 de sistema integrado Service Providers Selection considerando el componente georreferenciado y la contabilidad regulatoria 1.1.1.2-CI-8899 / Diagnóstico para la identificación de la información necesaria y Improving Governance of Individual relevante de los prestadores IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 30,303.00 0.00 Canceled 2019-09-02 2019-09-07 2019-09-28 2019-11-02 2019-12-17 urbanos y rurales para el Service Providers Selection sector saneamiento y las estrategias para su recopilación e integración 1.1.5.1-CI-8899 / Levantamiento y procesamiento de información Improving Governance of Individual de la implementacion de los IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 16,787.00 0.00 Canceled 2019-09-16 2019-09-21 2019-10-12 2019-11-16 2019-12-31 proyectos contenidos en los Service Providers Selection Planes Regionales de Saneamiento vinculados al cierre de brechas 3.3.4-CI-8899 / Consultoría Individual General Project Pending para la Elaboración Línea de IBRD / 88990 Post Consultant Limited 121,212.00 0.00 2019-09-09 2019-09-14 2019-10-05 2019-11-09 2020-03-08 Administration Implementation Base Selection 3.3.5-CI-8899 / Diseño del Individual General Project software de evaluación y IBRD / 88990 Post Consultant Limited 15,152.00 0.00 Canceled 2019-09-13 2019-09-18 2019-10-09 2019-11-13 2020-01-12 Administration seguimiento Selection 3.4.14-CI-8899 / Proceso de Individual General Project Contratación del Especialista IBRD / 88990 Post Consultant Limited 78,787.88 0.00 Canceled 2019-08-22 2019-09-07 2019-08-27 2019-09-17 2019-10-22 2023-12-31 Administration 02 para Componente 1 Selection 3.4.1-SD-8899 / Proceso de Contratación del Director de General Project IBRD / 88990 Prior Direct Selection Direct 310,909.00 0.00 Canceled 2019-07-26 2019-08-20 2019-07-28 2019-07-31 2023-12-31 la Unidad Ejecutora del Administration Programa (UE003) 3.4.3-SD-8899 / Proceso de Contratación del Especialista General Project IBRD / 88990 Post Direct Selection Direct 241,818.00 0.00 Canceled 2019-07-19 2019-09-19 2019-07-21 2019-07-24 2023-12-31 en Adquisiciones (Jefe Área de Administration Adquisiciones) 3.4.2-CI-8899 / Proceso de Individual General Project Contratación del Coordinador IBRD / 88990 Post Consultant Limited 271,515.00 26,690.27 Signed 2019-08-05 2020-01-08 2019-08-10 2020-01-08 2019-08-31 2020-01-15 2019-10-05 2020-01-20 2023-12-31 Administration Administrativo Selection 3.4.7-CI-8899 / Proceso de Individual Contratación del Especialista General Project IBRD / 88990 Post Consultant Limited 237,576.00 67,005.41 Signed 2019-08-05 2019-08-20 2019-08-10 2019-10-08 2019-08-31 2019-10-17 2019-10-05 2019-10-17 2023-12-31 Financiero (Jefe Área de Administration Selection Finanzas) 3.4.8-CI-8899 / Proceso de Individual Contratación del Especialista General Project IBRD / 88990 Post Consultant Limited 233,333.00 9,108.22 Signed 2019-08-22 2019-10-21 2019-08-27 2020-02-10 2019-09-17 2020-02-24 2019-10-22 2020-02-28 2023-12-31 en Contabilidad (Jefe Área de Administration Selection Contabilidad) 3.4.11-CI-8899 / Proceso de Individual Contratación del Especialista General Project IBRD / 88990 Post Consultant Limited 159,090.91 17,737.88 Signed 2019-08-22 2019-10-21 2019-08-27 2019-11-05 2019-09-17 2019-11-18 2019-10-22 2019-11-19 2023-12-31 en Comunicación (Jefe Área de Administration Selection Comunicaciones) 3.4.22-CI-8899 / Proceso de Individual Contratación de Especialista General Project Under IBRD / 88990 Post Consultant Limited 151,515.15 0.00 2019-08-26 2021-06-10 2019-08-31 2019-09-21 2019-10-26 2023-12-31 en indicadores y Base de Administration Implementation Selection Datos 3.4.10-CI-8899 / Proceso de Individual General Project Contratación del Asesor Legal IBRD / 88990 Post Consultant Limited 263,030.30 30,832.93 Signed 2019-08-05 2020-02-21 2019-08-10 2020-02-27 2019-08-31 2020-03-02 2019-10-05 2020-03-03 2023-12-31 Administration (Jefe Área de Asesoría Legal) Selection 3.4.6-CI-8899 / Proceso de Contratación del Especialista Individual General Project en Planeamiento y IBRD / 88990 Post Consultant Limited 248,939.00 10,718.00 Terminated 2019-08-05 2019-09-03 2019-08-10 2019-10-01 2019-08-31 2019-10-03 2019-10-05 2019-10-15 2023-12-31 Administration Presupuesto (Jefe Área de Selection Planeam. Ppto) 3.4.12-CI-8899 / Proceso de Individual General Project Contratación del Coordinador IBRD / 88990 Post Consultant Limited 240,909.09 10,593.22 Signed 2019-08-05 2019-09-03 2019-08-10 2021-03-16 2019-08-31 2021-03-29 2019-10-05 2021-04-07 2023-12-31 Administration Técnico Componente 1 Selection 3.4.21-CI-8899 / Proceso de Individual General Project Contratación de Especialista IBRD / 88990 Post Consultant Limited 151,515.15 0.00 Canceled 2019-08-26 2019-08-31 2019-09-21 2019-10-26 2023-12-31 Administration en presupuesto Selection 3.4.13-CI-8899 / Proceso de Individual General Project Contratación del Especialista IBRD / 88990 Post Consultant Limited 151,515.15 70,204.62 Signed 2019-08-22 2019-09-03 2019-08-27 2019-09-04 2019-09-17 2019-09-09 2019-10-22 2019-09-10 2023-12-31 Administration 01 para Componente 1 Selection 3.4.9-CI-8899 / Proceso de Contratación del Especialista Individual General Project en Monitoreo y Evaluación IBRD / 88990 Post Consultant Limited 263,030.30 87,164.03 Completed 2019-08-05 2019-09-03 2019-08-10 2019-09-04 2019-08-31 2019-09-11 2019-10-05 2019-09-11 2023-12-31 2021-01-18 Administration (Jefe Área de Monitoreo y Selection Evaluación) 3.4.20-CI-8899 / Proceso de Contratación de Analista Individual General Project Ambiental y Social IBRD / 88990 Post Consultant Limited 151,515.15 14,813.38 Signed 2019-08-05 2019-10-21 2019-08-10 2019-11-06 2019-08-31 2019-11-18 2019-10-05 2019-11-20 2023-12-31 Administration (Especialista en Salvaguarda Selection Ambiental y Social) Page 4 3.4.23-CI-8899 / Individual Coordinador Responsable del General Project IBRD / 88990 Post Consultant Limited 237,576.00 86,519.11 Signed 2019-07-29 2019-09-03 2019-08-03 2019-09-26 2019-08-24 2019-10-04 2019-09-28 2019-10-04 2023-12-31 Componente 2 (apoyo al Administration Selection PNSU) 3.4.24-CI-8899 / Individual General Project Especialista Adquisiciones IBRD / 88990 Post Consultant Limited 186,667.00 52,215.98 Signed 2019-07-29 2019-09-03 2019-08-03 2019-09-25 2019-08-24 2019-10-04 2019-09-28 2019-10-04 2023-12-31 Administration (apoyo al PNSU) Selection 3.4.28-CI-8899 / Individual General Project Especialista Presupuesto IBRD / 88990 Post Consultant Limited 176,667.00 60,525.03 Signed 2019-07-29 2019-09-03 2019-08-03 2019-10-01 2019-08-24 2019-10-15 2019-09-28 2019-10-15 2023-12-31 Administration (apoyo al PNSU) Selection 3.4.29-CI-8899 / Individual General Project Especialista Financiero IBRD / 88990 Post Consultant Limited 186,667.00 45,421.56 Terminated 2019-07-29 2019-09-03 2019-08-03 2019-10-04 2019-08-24 2019-10-15 2019-09-28 2019-10-15 2023-12-31 Administration (apoyo al PNSU) Selection Individual 3.4.30.CI-8899 / Especialista General Project IBRD / 88990 Post Consultant Limited 183,333.00 11,616.49 Signed 2019-08-12 2019-11-29 2019-08-17 2019-12-04 2019-09-07 2019-12-20 2019-10-12 2019-12-27 2023-12-31 en Contabilidad Administration Selection 3.4.31-CI.8899 / Especialista Individual General Project Legal IBRD / 88990 Post Consultant Limited 176,667.00 38,389.02 Signed 2019-08-12 2019-10-10 2019-08-17 2019-10-11 2019-09-07 2019-10-18 2019-10-12 2019-10-30 2023-12-31 Administration (apoyo al PNSU) Selection 3.4.32-CI-8899 / Individual Coordinador técnico del General Project IBRD / 88990 Post Consultant Limited 208,333.00 41,882.09 Signed 2019-08-12 2019-10-16 2019-08-17 2019-10-16 2019-09-07 2019-10-24 2019-10-12 2019-10-30 2023-12-31 componente 2 Administration Selection (apoyo al PNSU) 3.4.33-CI-8899 / Individual General Project Coordinador 01 de Proyecto IBRD / 88990 Post Consultant Limited 103,333.00 36,757.44 Signed 2019-08-12 2019-10-11 2019-08-17 2019-10-14 2019-09-07 2019-10-18 2019-10-12 2019-10-18 2021-12-31 Administration (apoyo al PNSU) Selection 3.4.34-CI.8899 / Individual General Project Coordinador 02 de Proyecto IBRD / 88990 Post Consultant Limited 53,333.00 36,508.33 Signed 2019-08-12 2019-10-11 2019-08-17 2019-10-11 2019-09-07 2019-10-18 2019-10-12 2019-10-18 2020-12-31 Administration (apoyo al PNSU) Selection 3.4.35-CI-8899 / Individual General Project Coordinador 03 de Proyecto IBRD / 88990 Post Consultant Limited 50,000.00 36,455.71 Signed 2019-09-15 2019-10-11 2019-09-20 2019-10-11 2019-10-11 2019-10-14 2019-11-15 2019-10-18 2020-12-31 Administration (apoyo al PNSU) Selection 3.4.50-CI-8899 / Individual General Project Especialista Social IBRD / 88990 Post Consultant Limited 173,333.00 32,347.38 Signed 2019-08-12 2019-09-03 2019-08-17 2019-10-14 2019-09-07 2019-10-28 2019-10-12 2019-10-28 2023-12-31 Administration (apoyo al PNSU) Selection 3.4.51-CI-8899 / Individual General Project Especialista Ambiental IBRD / 88990 Post Consultant Limited 173,333.00 32,347.38 Signed 2019-08-12 2019-09-03 2019-08-17 2019-10-28 2019-09-07 2019-11-05 2019-10-12 2019-11-05 2023-12-31 Administration (apoyo al PNSU) Selection 3.4.52-CI-8899 / Individual Especialista en proyectos de General Project IBRD / 88990 Post Consultant Limited 133,333.00 9,025.83 Signed 2019-08-12 2019-11-07 2019-08-17 2019-12-13 2019-09-07 2019-12-26 2019-10-12 2020-01-02 2022-12-31 inversión Administration Selection (apoyo al PNSU) 3.4.57-CI-8899 / Individual Especialista en Saneamiento General Project IBRD / 88990 Post Consultant Limited 121,212.00 26,707.96 Signed 2019-08-12 2019-11-26 2019-08-17 2019-12-11 2019-09-07 2019-12-16 2019-10-12 2019-12-16 2022-12-31 Fisico Legal Administration Selection (apoyo al PNSU) 3.4.36-CI-8899 / Improving Governance of Individual COORDINADOR DE IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 90,000.00 32,599.11 Signed 2019-10-10 2019-10-09 2019-10-15 2019-11-18 2019-11-05 2019-11-26 2019-12-10 2019-11-26 2020-06-07 PROYECTOS 2 - SEDACUSCO Service Providers Selection UIC2 PE-OTASS-144409-CS-INDV Individual General Project / Especialista en IBRD / 88990 Post Consultant Limited 216,363.00 57,120.96 Completed 2019-10-01 2019-09-24 2019-10-06 2019-09-26 2019-10-27 2019-10-03 2019-12-01 2019-10-07 2020-05-29 2020-10-27 Administration Adquisiciones UE003 Selection CONS IND 3.4.24 / Individual ESPECIALISTA EN General Project IBRD / 88990 Post Consultant Limited 174,242.00 6,697.76 Signed 2020-02-20 2020-10-23 2020-02-21 2020-11-05 2020-02-26 2020-11-06 2020-02-28 2020-11-09 2023-12-31 PLANEAMIENTO Y Administration Selection PRESUPUESTO DE LA UE 003 1.2.7.2 ARQUITECTURA DE SISTEMAS / Consultoria Improving Governance of Individual Individual Diagnostico de IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 6,666.67 6,066.46 Signed 2020-03-04 2020-06-16 2020-03-06 2020-07-15 2020-03-10 2020-08-20 2020-03-16 2020-08-20 2020-05-15 procesos de evaluación de Service Providers Selection expedientes técnicos - Arquitectura de Sistemas 1.2.7.1 ARQUITECTURA DE PROCESOS / Consultoria Improving Governance of Individual Diagnostico de procesos de IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 6,666.67 6,066.46 Signed 2020-03-04 2020-06-04 2020-03-06 2020-07-29 2020-03-10 2020-08-17 2020-03-16 2020-09-18 2020-05-15 evaluación de expedientes Service Providers Selection técnicos - Arquitectura de Procesos 3.4.27 ESPECIALISTA EN Individual PLANEAMIENTO UIC2 / General Project IBRD / 88990 Post Consultant Limited 150,000.00 8,002.63 Signed 2020-03-04 2020-03-09 2020-03-06 2021-03-29 2020-03-10 2021-03-31 2020-03-16 2021-04-05 2023-12-31 ESPECIALISTA EN Administration Selection PLANEAMIENTO UIC 2 3.4.4 PROFESIONAL EN Individual ADQUISICIONES / General Project IBRD / 88990 Post Consultant Limited 136,363.64 0.00 Canceled 2020-03-13 2020-03-16 2020-03-24 2020-03-31 2023-12-31 PROFESIONAL EN Administration Selection ADQUISICIONES UE 003 CONS IND 1.1.7.5 METOD DE INDICADORES / Contratación de servicio de consul individ para la elaboración de un instrumento de planificación Improving Governance of Individual asociado a la metodología e IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 11,363.64 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 indicadores de los criterios Service Providers Selection para el cofinanciamiento de los costos de operación y mantenimiento de proyectos APP de Saneamiento Page 5 CONS IND 1.1.7.6 PROYECTOS APP / Contratación de servicio de consultoría individual para la Improving Governance of Individual elaboración de una propuesta IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 5,454.55 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-06-30 de instrumento de Service Providers Selection planificación de los proyectos en Asociaciones Público Privadas del Sector Saneamiento CONS IND 1.1.7.7 ING. SANIT CHINCHA-CUS / Contratación de servicio de consultoría Improving Governance of Individual individual para la evaluación IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 10,909.09 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 de aspectos de ingeniería Service Providers Selection sanitaria de los proyectos APP PTAR Chincha y PTAR Cusco CONS IND 1.1.7.8 ING. SANITARIA TARAPOTO / Contratación de servicio de Improving Governance of Individual consultoría individual para la IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 10,909.09 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 evaluación de aspectos de Service Providers Selection ingeniería sanitaria de los proyectos APP PTAR Tarapoto y PTAR Cajamarca CONS IND 1.1.7.9 GEOTECNIA, SUELOS Y TOP / Contratación de servicio de consultoría individual para la Improving Governance of Individual evaluación de aspectos de IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 10,909.09 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 geotecnia, mecánica de suelos Service Providers Selection y topografía de los proyectos APP PTAR Chincha, PTAR Tarapoto, PTAR Cusco y PTAR Cajamarca CONS IND 1.1.7.10 INTERFERENCIAS / Contratación de servicio de consultoría individual para la Improving Governance of Individual evaluación de los aspectos de IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 10,909.09 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 interferencias y estudio de Service Providers Selection canteras de los proyectos APP PTAR Chincha, PTAR Tarapoto, PTAR Cusco y PTAR Cajamarca CONS IND 1.1.7.11 ANALISIS DE RIESGO / Contratación de servicio de consultoría individual para la evaluación de los aspectos de análisis de Improving Governance of Individual riesgos referido a la IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 10,909.09 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 integridad física y/o Service Providers Selection estructural de la infraestructura de los proyectos APP PTAR Chincha, PTAR Cusco, PTARTarapoto y PTAR Cajamarca CONS IND 1.1.7.12 GESTIÓN SOCIAL / Contratación de servicio de consultoría Improving Governance of Individual individual para la gestión IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 9,090.91 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 social para obtener la Service Providers Selection aceptación social de los proyectos APP PTAR Chincha, PTAR Tarapoto y PTAR Cusco CONS IND 1.1.7.13 GESTIÓN DE PROYECTOS / Contratación de servicio de consultoría Improving Governance of Individual individual para la gestión IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 9,090.91 0.00 Canceled 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 oportuna de los proyectos APP Service Providers Selection y articulación con los gobiernos subnacionales CONS IND 1.2.3.1 ESTRATEGIA DE COMUNICAC / Improving Governance of Individual Elaboración de la Estrategia IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 7,878.79 0.00 Canceled 2020-04-24 2020-04-29 2020-05-08 2020-05-13 2020-07-13 de Comunicación del Service Providers Selection ¨Programa de Modernización SD 1.2.3.4 DISEÑO E IMPLEMENT-CORNAVI / Diseño e Implementación de Improving Governance of Individual Campana de Valorización del IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 13,939.39 13,579.14 Signed 2020-04-15 2020-04-16 2020-04-16 2020-04-21 2020-04-17 2020-04-22 2020-04-17 2020-04-22 2020-07-31 Servicio de Agua y Service Providers Selection Saneamiento Brindado por las EPS a Nivel Nacional en Tiempos de Coronavirus SD 1.2.3.4 CREATIVO Y PRODUCCIÓN / Diseno Creativo y Producción de Improving Governance of Individual Materiales de la Campana IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 12,909.09 12,575.46 Signed 2020-04-15 2020-04-16 2020-04-16 2020-04-21 2020-04-17 2020-04-22 2020-04-17 2020-04-22 2020-05-30 Valorización del Servicio de Service Providers Selection Agua y Saneamiento Brindado por las EPS a Nivel Nacional en Tiempos de Coronavirus CONS IND 1.3.2.4 ESTRATEGIA COMUNICACIO / Consultoria para el Improving Governance of Individual Diagnóstico y el Inventario de IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 15,151.52 0.00 Canceled 2020-05-04 2020-05-08 2020-05-18 2020-05-25 2020-07-27 los equipos que soportan los Service Providers Selection sistemas administrativos y gerenciales de las EPS CONS IND 1.3.4.5.DIAGNOSTICO E INVENTARI / Consultoria para Improving Governance of Individual el Diagnóstico y el Inventario IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 15,151.52 0.00 Canceled 2020-05-04 2020-05-08 2020-05-15 2020-05-20 2020-07-21 de los equipos que soportan Service Providers Selection los sistemas comerciales de las EPS Page 6 SD 1.3.1.1 DETERMINACION ALCANCE EPS / SERVICIO DE CONSULTORIA PARA LA DETERMINACIÓN DEL ALCANCE Y CONTENIDO DEL PLAN DE ACCIONES DE Improving Governance of Individual URGENCIA Y DEL PLAN DE IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 10,000.00 9,598.46 Signed 2020-05-13 2020-05-15 2020-05-14 2020-05-15 2020-05-15 2020-05-15 2020-05-18 2020-05-15 2020-06-18 REFLOTAMIENTO DE LAS Service Providers Selection EMPRESAS PRESTADORAS DE SERVICIOS DE SANEAMIENTO DE ACCIONARIADO MUNICIPAL INCORPORADAS AL RÉGIMEN DE APOYO TRANSITOR CONS IND 1.2.1.1 / CONTRATACIÓN DE Improving Governance of Individual CONSULTORIA INDIVIDIAL Under IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 182,424.24 0.00 2020-06-03 2020-06-08 2020-06-12 2020-06-19 2023-12-30 SUPERVISION DE PROYECTOS Implementation Service Providers Selection DEL COMPONENTE 2 DEL PROGRAMA SD 1.2.3.2 SEGUIMIENTO ESTRATEGIA / SERVICIO PARA EL SEGUMIENTO A LA Improving Governance of Individual IMPLEMENTACIÓN DE IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 4,848.48 0.00 Canceled 2020-06-15 2020-06-17 2020-06-16 2020-06-17 2020-06-18 2020-08-17 ACCIONES PREVIAS DE LA Service Providers Selection ESTRATEGIA DE COMUNICACIONES SD N° 1.3.4.3 Improving Governance of Individual SISTEMATIZACION / IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 3,030.30 0.00 Canceled 2020-06-22 2020-06-23 2020-06-24 2020-06-25 2020-07-24 SISTEMATIZACION DEL PRIMER Service Providers Selection ENCUENTRO AGUAS TODAS SD 1.2.3.6 PG WEB MIGRACION A PLATAFORMA / CONTRACION DEL SERVICIO DE CONSULTORIA PARA LA Improving Governance of Individual IMPLEMENTACION DE LA IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 6,060.61 5,553.94 Signed 2020-08-10 2020-10-13 2020-08-17 2020-10-19 2020-08-19 2020-10-30 2020-08-20 2020-10-30 2020-10-08 PAGINA WEB INSTITUSIONAL Service Providers Selection Y MIGRACIÓN A LA PLATAFORMA ÚNICA DIGITAL GOB.PE DE UE 003 CI 1.2.3.2 ESP EN COMUNICACIONES / CONSULTORIA INDIVIDUAL PARA EL SERVICIO DE UN Improving Governance of Individual ESPECIALISTA EN IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 8,181.82 0.00 Canceled 2020-08-10 2020-08-17 2020-08-20 2020-08-24 2020-11-23 COMUNICACIONES PARA EL Service Providers Selection DSARROLLO DE LAS ACCIONES DE PROMOCIÓN Y DIFUSIÓN DE LA ESTRATEGIA DE COMUNICACIONES CONS IND 1.1.7 / CONSULTORIA ASESORIA EN Improving Governance of Individual LA ESTANDARIZACION DE IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 9,090.91 8,272.44 Signed 2020-08-17 2020-08-04 2020-08-25 2020-08-20 2020-08-31 2020-08-25 2020-09-04 2020-08-28 2020-11-03 CONTENIDOS DE Service Providers Selection PLANTEAMIENTO TÉCNICO DE LOS PROYECTOS DE APP CI 1.2.2.1.1 / Servicio de consultora individual, para la revision,evaluacion, analisis y diagnostico de la Improving Governance of Individual normatividad y jurisprudencia IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 7,272.73 6,617.95 Signed 2020-09-07 2020-09-24 2020-09-10 2020-10-05 2020-09-11 2020-10-06 2020-09-15 2020-10-12 2020-11-04 vigentes y aplicables a las EPS Service Providers Selection municipales, para el diseño e implementacion de un sistema salarial integral. CI 1.2.2.1.2 / Serv. C.I.. para la revision,evaluacion, analisis y diagnostico de la normatividad y jurisprudencia Improving Governance of Individual vigentes y aplicables a las EPS IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 7,272.73 0.00 Canceled 2020-09-07 2020-11-12 2020-09-10 2020-09-11 2020-09-15 2020-11-04 municipales, diseño e Service Providers Selection implementacion del sistema de evaluacion de rendimiento, plan de desarrollo y linea de carrera CI 1.2.2.1.3 / Serv CI revision,evaluacion, analisis y diagnostico de los convenios colectivos, suscritos por las Improving Governance of Individual 18 EPS en RAT y 01 UE Agua IBRD / 88990 Water Supply and Sanitation Post Consultant Direct 7,272.73 6,617.95 Signed 2020-09-07 2020-09-24 2020-09-10 2020-10-05 2020-09-11 2020-10-08 2020-09-15 2020-10-12 2020-11-14 Tumbes y la problemática y Service Providers Selection obstaculos que influyen en la definicion de un sistema salarial integral CI 3.4.15 ESP 3 COMP 1 / Individual Contratacion de Especialista General Project IBRD / 88990 Post Consultant Limited 147,727.27 8,625.21 Signed 2020-09-07 2020-09-26 2020-09-14 2020-10-05 2020-09-18 2020-10-12 2020-09-22 2020-10-15 2023-12-31 Técnico 03 DEL COMPONENTE Administration Selection 1 CI 3.4.14 ESP 2 COMP 1 / Individual CONTRATACIÓN DE General Project IBRD / 88990 Post Consultant Limited 147,727.27 7,558.74 Signed 2020-09-15 2020-09-26 2020-09-22 2020-10-21 2020-09-28 2020-10-22 2020-09-30 2020-10-26 2023-12-31 ESPECIALISTA TÉCNICO 02 Administration Selection DEL COMPONENTE 1 Individual CI 3.4.58 COMUNICACIONES General Project IBRD / 88990 Post Consultant Limited 94,545.45 2,205.98 Signed 2020-09-21 2020-09-24 2020-09-24 2020-10-02 2020-09-28 2020-10-08 2020-09-30 2020-10-12 2023-12-31 / ESP EN COMUNICACIONES Administration Selection PE-OTASS-213910-CS-INDV Individual / Especialista en General Project IBRD / 88990 Post Consultant Limited 136,000.00 13,388.49 Signed 2021-02-01 2021-02-05 2021-02-10 2021-02-23 2021-02-22 2021-02-24 2021-03-01 2021-03-02 2022-02-28 adquisiciones - Jefe área de Administration Selection adquisiciones PE-OTASS-213911-CS-INDV Individual General Project / Especialista en Contabilidad IBRD / 88990 Post Consultant Limited 136,000.00 9,730.15 Signed 2021-02-01 2021-02-12 2021-02-08 2021-03-15 2021-02-15 2021-03-29 2021-03-01 2021-03-31 2022-02-28 Administration - Jefe del Área de Selection Contabilidad Page 7 PE-OTASS-213919-CS-INDV Individual / Especialista en Planeamiento General Project IBRD / 88990 Post Consultant Limited 136,000.00 9,942.97 Signed 2021-02-01 2021-01-21 2021-02-06 2021-03-16 2021-02-23 2021-03-29 2021-03-01 2021-04-07 2022-02-28 y Presupuesto - Jefe Área de Administration Selection Planeamiento y Presupuesto PE-OTASS-213923-CS-INDV Individual / Director de la Unidad General Project IBRD / 88990 Prior Consultant Limited 310,909.00 60,232.72 Signed 2021-02-01 2021-01-21 2021-02-05 2021-01-27 2021-02-15 2021-02-02 2021-03-01 2021-02-02 2022-02-28 Ejecutora del Programa Administration Selection (UE003) PE-OTASS-218456-CS-INDV Individual / Especialista en Monitoreo y General Project IBRD / 88990 Post Consultant Limited 159,696.97 4,238.97 Signed 2021-03-01 2021-02-12 2021-03-06 2021-02-18 2021-03-27 2021-02-22 2021-05-01 2021-02-27 2023-12-31 Evaluación (Jefe Área de Administration Selection Monitoreo y Evaluación) PE-OTASS-220816-CS-INDV Individual General Project / Especialista GIS en IBRD / 88990 Post Consultant Limited 6,794.57 7,155.45 Signed 2021-03-15 2021-03-09 2021-03-20 2021-03-31 2021-04-04 2021-04-12 2021-05-04 2021-04-21 2021-07-18 Administration Fotogrametria Selection Improving and Expanding PE-OTASS-220824-CS-INDV Individual Water Supply and Sanitation / Especialista GIS en Modelo IBRD / 88990 Post Consultant Limited 7,360.14 7,430.55 Signed 2021-03-15 2021-03-09 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-04-21 2021-07-24 Services in the Participating Digital de Terreno Selection EPS Improving and Expanding PE-OTASS-220828-CS-INDV Individual Water Supply and Sanitation / Analista GIS en Sistema de IBRD / 88990 Post Consultant Limited 6,340.58 6,677.35 Signed 2021-03-15 2021-03-09 2021-03-20 2021-03-26 2021-04-04 2021-04-12 2021-05-10 2021-04-21 2021-05-17 Services in the Participating Agua Potable Selection EPS Improving and Expanding PE-OTASS-220830-CS-INDV Individual Water Supply and Sanitation / Especialista GIS en Sistemas IBRD / 88990 Post Consultant Limited 6,190.94 6,250.16 Signed 2021-03-15 2021-03-09 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-04-21 2021-05-17 Services in the Participating de Alcantarillado Selection EPS Improving and Expanding Individual PE-OTASS-220832-CS-INDV Water Supply and Sanitation IBRD / 88990 Post Consultant Limited 6,431.88 6,493.41 Signed 2021-03-15 2021-03-18 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-04-21 2021-07-24 / Analista BIM en Arquitectura Services in the Participating Selection EPS Improving and Expanding Individual PE-OTASS-220834-CS-INDV Water Supply and Sanitation IBRD / 88990 Post Consultant Limited 6,892.21 6,951.73 Signed 2021-03-15 2021-03-18 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-04-21 2021-07-24 / Analista BIM en Sanitaria Services in the Participating Selection EPS Improving and Expanding PE-OTASS-220835-CS-INDV Individual Water Supply and Sanitation / Especialista GIS en Sistema IBRD / 88990 Post Consultant Limited 6,018.48 6,076.05 Signed 2021-03-15 2021-03-09 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-04-21 2021-07-24 Services in the Participating Comercial Selection EPS PE-OTASS-224959-CS-INDV Individual General Project Under / Especialista técnico 04 del IBRD / 88990 Post Consultant Open 123,134.32 0.00 2021-04-01 2021-04-06 2021-05-05 2021-05-26 2021-06-30 2021-12-27 Administration Implementation componente 1 Selection PE-OTASS-224960-CS-INDV Individual / Especialista en supervisión General Project IBRD / 88990 Post Consultant Open 123,134.32 5,761.11 Signed 2021-04-01 2021-03-12 2021-05-05 2021-04-26 2021-05-26 2021-04-28 2021-06-30 2021-05-06 2021-12-27 en actividades y proyectos del Administration Selection programa PE-OTASS-224962-CS-INDV Individual General Project / Profesional en IBRD / 88990 Post Consultant Open 78,805.97 3,081.23 Signed 2021-04-01 2021-03-12 2021-04-21 2021-04-26 2021-05-12 2021-04-27 2021-06-16 2021-05-03 2021-12-13 Administration comunicaciones Selection PE-OTASS-225692-CS-INDV / Generación de capacidades Improving Governance of Individual Under de planificación, articulación y IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 9,571.42 0.00 2021-03-22 2021-04-05 2021-03-27 2021-04-17 2021-05-22 2021-11-18 Implementation seguimiento del sector Service Providers Selection saneamiento en el MVCS Individual PE-OTASS-229598-CS-INDV General Project IBRD / 88990 Post Consultant Limited 136,363.64 18,059.42 Signed 2021-05-03 2021-04-29 2021-05-06 2021-05-19 2021-05-14 2021-05-27 2021-06-07 2021-05-28 2025-02-19 / Profesional en Adquisiciones Administration Selection PE-OTASS-229754-CS-INDV Individual General Project / Coordinador administrativo IBRD / 88990 Post Consultant Open 200,000.00 26,840.93 Signed 2021-05-03 2021-04-29 2021-06-21 2021-05-21 2021-07-12 2021-05-24 2021-08-16 2021-05-31 2022-02-12 Administration del Componente 3 Selection PE-OTASS-235401-CS-INDV / Elaboración de propuesta Improving Governance of Individual Under para la actualización de la IBRD / 88990 Water Supply and Sanitation Post Consultant Limited 26,971.00 0.00 2021-05-24 2021-05-31 2021-05-29 2021-06-19 2021-07-24 2022-01-20 Implementation Política Nacional de Service Providers Selection Saneamiento (PNS). PE-OTASS-235831-CS-INDV Individual / COORDINADOR DE General Project Under IBRD / 88990 Post Consultant Limited 60,789.00 0.00 2021-05-24 2021-06-16 2021-05-29 2021-06-19 2021-07-24 2022-01-20 PROYECTOS 1 PARA EL Administration Implementation Selection AMBITO DE LA EPS SEDAPAR PE-OTASS-234106-CS-INDV Individual General Project / Especialista en IBRD / 88990 Post Consultant Open 104,729.73 0.00 Canceled 2021-05-17 2021-05-13 2021-07-05 2021-07-26 2021-08-30 2022-02-26 Administration Adquisiciones Componente 3 Selection PE-OTASS-234106-CS-INDV- Individual General Project 2 / Especialista en IBRD / 88990 Prior Consultant Open 104,729.73 0.00 Under Review 2021-06-04 2021-06-09 2021-07-23 2021-08-13 2021-09-17 2022-03-16 Administration Adquisiciones Componente 3 Selection PE-OTASS-238337-CS-CDS / Individual General Project Under Especialista de Contabilidad: IBRD / 88990 Post Consultant Open 99,000.00 0.00 2021-06-30 2021-06-18 2021-08-18 2021-09-08 2021-10-13 2022-04-11 Administration Implementation Jefe del Área de Contabilidad Selection PE-OTASS-238821-CS-INDV Improving Governance of Individual Under / Implementación Sistema de IBRD / 88990 Water Supply and Sanitation Post Consultant Open 12,631.00 0.00 2021-06-30 2021-06-16 2021-08-18 2021-09-08 2021-10-13 2022-04-11 Implementation evaluación de rendimiento Service Providers Selection PE-OTASS-238825-CS-INDV Improving Governance of Individual / Implementación de un IBRD / 88990 Water Supply and Sanitation Post Consultant Open 12,631.00 0.00 Under Review 2021-06-30 2021-06-16 2021-08-18 2021-09-08 2021-10-13 2022-04-11 Sistema Salarial Integral Service Providers Selection Page 8 PROCUREMENT PLAN (Textual Part) Project information: China: Green Urban Financing and Innovation Project Project Implementation agency: Shanghai Chengtou Financial Service Company Date of the Procurement Plan: Apr. 2019 Period covered by this Procurement Plan: Apr. 2019 till Jun. 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. A. The Bank’s Standard Procurement Documents (SPDs): The Bank’s SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures (Tendering and Bidding Law of the Peoples’ Republic of China, i.e. TBL promulgated by its Order No. 21 dated August 30, 1999 and the Implementation Regulations of the TBL promulgated by its State Council Order No. 613 dated November 30, 2011 and any amendments thereof) may be used with the following conditions to meet the requirements for open competitive procurement of paragraph 5.4 of the Procurement Regulations: a) All procurement notices shall be published in a national newspaper of wide circulation, or on a widely-used website / electronic portal with free access. b) A minimum of twenty (20) business days shall be given to Bidders between the date of such advertisement (or the date of availability of procurement documents, whichever is later and the deadline for the submission of bids). The advertisement and procurement documents shall specify the deadline for the submission of bids. Potential Bidders shall be allowed to inspect and purchase procurement documents at any time prior to the deadline for the submission of bids. c) Any Bidder/Consultant should be eligible to participate in a procurement process and to be awarded a Bank-financed contract as defined in paragraphs 3.21, 3.22 and 3.23 of the Procurement Regulations. d) Bidders/Consultants shall be allowed to submit bids/proposals by mail or in person. Bidders/consultants shall not be mandatory required to be present at the bid/proposal opening session. e) Bidders should not be required to register as a condition for inspecting or purchasing procurement documents, submitting its bid or receiving contract award. A winner Bidder, shall be given reasonable opportunity of registering (if required) before contract signing without any let or hindrance. Bidding shall not be restricted to any class of contractors. f) The winning bidder shall not be required, as a condition of award, to reduce its bid price No contract negotiation shall be permitted unless agreed in the procurement plan. g) No bid may be rejected solely on the basis that the bid price exceeds any cost estimate. Rejection of all bids or re-bidding shall not be allowed solely because the number of bids is less than three (3). Rebidding shall not take place without any sound justification. h) The Bank’s procurement documents for approaching the national market or any procurement document acceptable to the Bank shall be used. All procurement documents must require that bidders/consultants present a signed acceptance at the time of bidding or submitting a proposal, to be incorporated in any resulting contract, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i) The procurement documents shall disclose the newspaper and / or the electronic means in which the information on contract award shall be published. j) The contract award notification shall identify: (a) name and address of the Borrower’s Project Implementing Unit, (b) name and reference number of the contract being awarded and the selection method used (c) names of all Bidders/Consultants that submitted bids/proposals and their prices as read out at the bid opening meeting and as evaluated (d) names of all Bidders/ Consultants whose bids/proposals were rejected either as nonresponsive or as not meeting qualification criteria or were not evaluated, with the reasons therefor and (e) the name of the successful Bidder/Consultant, the final contract price, the contract duration and a summary of its scope. i) The Borrower shall implement an effective complaint mechanism allowing bidders or consultants to complain, and have their complaints handled and responded in a timely manner. Procurement documents should indicate the complaint mechanism procedure and provide the professional title and address of the officials to whom such protests should be sent. j) The Bank shall be allowed to review procurement documentation and activities related to the activities included in the procurement plan. C. Other national procurement arrangements: When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. D. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. E. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations is not applicable: F. Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations: Goods: Domestic Preference is applicable for those contracts identified in the Procurement Plan tables. Works: Domestic Preference is not applicable G. Other Relevant Procurement Information:.                              2019-2021   -                 Procurement Plan for Component 3 Institutional Strengthening and Project Management (2019-2021) Green Urban Financing and Innovation Project  Awarded Contracts financed with WB loan  上上上上 Updated on上May11, 2021                             Contra         Implementa Updated Procure    ct    Service No. tion Estimated ment WB Term Notes Content Method Cost Method Review (month s) 上上上上上上上上上上上上上上 上上上上上上上上上上上上上上 2020 上 上上上 A 6 上 1 上上 Green Urban 2025 上 Financing & 上上上上 上上 6 上 30 上 IDP2.3 $250,000.0 Innovation Consulting CQS Post June 1, . A 0 Project- service review 2020 - Environmental June Management 30, Consulting 2025 Service Contract 上上上上上上上上上上上上上上 2020 上 上上上上上上上上上上上上上 B 11 上 1 上 Green Urban 上 2025 Financing & 上 6 上 30 Innovation 上上上上 上上 上 IDP2.3 $250,000.0 Project- Consulting CQS Post Novemb B 0 Environmental service review er 1, Management 2020 - Consulting June Service Contract 30, B 2025 上上上上上上上上上上上上上上 上上上上上上上上上上上上上 A 2020 上 Green Urban 7 上 1 上上 Financing & 2025 上 上上上上 上上 IDP2.4 Innovation $300,000.0 6 上 30 上 Consulting CQS Post A Project- Social 0 July 1, service review Management 2020 - Consulting June 30, Service Contract 2025 A 2020 上 上上上上上上上上上上上上上上 11 上 1 上 上上上上上上上上上 B 上 2025 Green Urban 上 6 上 30 Financing & 上上上上 上上 上 IDP2.4 Innovation $200,000.0 Consulting CQS Post Novemb B Project- Social 0 service review er 1, Management 2020 - Consulting June Service Contract 30, B 2025 2019 上 6 上 7 上上 上上上上上上上上上上上上 2020 上 Legal Advisor 上上上上 上上 $200,000.0 6上6上 IDP2.5 Consulting Consulting CQS Post 0 June 7, Service Contract service review 2019 - (signed in 2019) June 6, 2020            Total 上上上上上1USD=6.5RMB yuan (上上 2021 上 5 上 6 上上上上上上上上上上上上上1 上上上上上上 6.4895 上上 Exchange rate: quoted in calculation: 1 USD = 6.5 RMB yuan (referred exchange rate announced by People's Bank of China: 1 USD = 6.4895 RMB yuan) PROCUREMENT China : Green Urban Financing and Innovation Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2021-05-24 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158124 GPN Date: 2021-05-18 Project Name: Green Urban Financing and Innovation Project Loan / Credit No: IBRD / 89590 S Executing Agency(ies): hanghai Green Urban Financing and Services Co., Ltd. WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDP2.3A / GUFIP- Consultant Institutional Strengthening Environmental Management IBRD / 89590 Post Qualification Limited 250,000.00 47,589.60 Signed 2021-05-28 2019-10-11 2021-06-11 2020-06-17 2021-07-11 2020-12-04 2021-08-15 2020-12-17 2025-06-30 and Project Management Consulting Service Contract A Selection IDP2.3B / GUFIP- Consultant Institutional Strengthening Environmental Management IBRD / 89590 Post Qualification Limited 250,000.00 47,746.15 Signed 2021-05-31 2019-10-11 2021-06-14 2020-06-17 2021-07-14 2020-12-04 2021-08-18 2020-12-17 2025-06-30 and Project Management Consulting Service Contract B Selection IDP2.4A / GUFIP-Social Consultant Institutional Strengthening Management Consulting IBRD / 89590 Post Qualification Limited 300,000.00 93,770.30 Signed 2021-05-31 2020-05-27 2021-06-14 2020-06-17 2021-07-14 2020-12-17 2021-08-18 2020-12-17 2025-06-30 and Project Management Service Contract A Selection IDP2.4B / GUFIP-Social Consultant Institutional Strengthening Management Consulting IBRD / 89590 Post Qualification Limited 200,000.00 42,267.08 Signed 2021-05-31 2020-05-27 2021-06-14 2020-06-17 2021-07-14 2021-01-15 2021-08-18 2021-01-21 2025-06-30 and Project Management Service Contract B Selection Consultant IDP2.5 / Legal Advisor Institutional Strengthening IBRD / 89590 Post Qualification Limited 200,000.00 50,094.32 Signed 2021-05-31 2019-04-28 2021-06-14 2019-05-16 2021-07-14 2019-08-01 2021-08-18 2019-08-01 2025-06-30 Consulting Service Contract and Project Management Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Years from April 2015 to July 2019 PMU Submit to IDA for NO: Supplier/Contractor/Consu PMU Finalize Shortlist, TS, Bidding Doc/Invitation to Bidding Doc/Invitation to Doc/Invitation to Quote Shortlist, TS, TOR, RF, Shortlist, TS, TOR, RF, Contract signing date Procurement Method Delivery/ completion Aprooved date for SPN Date (Tender Bid Opening date Contract amount Prior/Post review TOR, RF, Bidding Package IFB Nr. Techn/Financial Invitation Date) Starting year Latest Date ('000US$) Category Quote Quote ltant Description Vehicles for 1 MSTs,Secretariat,Value Chain Secretariat, PIU 201 2-Apr- 22-Apr- 30-Apr- 26- 29- Global Motors Contra CARMAC2-PG-15-01/1 G NCB Prior 2-Apr-15 4-Jun-15 84.87 5 15 15 15 Jun-15 Jun-15 CJSC 12- 14-Jul- Contra CARMAC2-PG-15-01/2 15 Sep- 98.74 Vekar LLC 15 Special Vehicles for VCS (Vet 201 13-Oct- 13-Oct- 13-Nov- 2 Service Centers, 1 vehicle) G NCB*** Post 5 1-Oct-15 15 15 15 Special Vehicles for VCS (Vet 17- 201 23-Dec- 1-Feb- 8-Mar- Service Centers, 1 vehicle) Contra G NCB Post 2-Dec-15 3-Dec-15 Feb- 14.84 Megna LLC 5 15 16 16 16 CARMAC2-PG-16-09 Servers for SSFS 201 15-Jul- 6-Aug- 7-Sep- 9-Nov- 8-Mar- Doxx Computers 2A Contra CARMAC2-PG-15-06 G NCB Post 5 27-Jul-15 15 4-Aug-15 15 15 15 16 124.16 LLC Special Vehicles for SSFS CVFS&P (State Service for Food Safety and 18- 201 9-Aug- 17- 3 Centre Veterinary, Food G SH Post 6 28-Jul-16 28-Jul-16 28-Jul-16 16 Aug- Oct-16 91.13 Galoper LLC Safety&Phytosanitary) Contra 16 CARMAC2-PG-16-12 Special Vehicles for VCS (Vet 201 4 Service Centers, 4 vehicles) G NCB Post 7 IT Equipment for 201 5 Secretariat,Value Chain G SH Post 6 Secretariat, PIU 13- 22- IT Equipment for MSTs Contra 201 14-May- 22-May- 24-Jul- 5A CARMAC2-PG-15-02 G SH Prior 5 12-May-15 May- 15 15 9-Jun-15 15 Sep- 11.56 Dolphin LLC 15 15 23- IT Equipment for PIU Contra 201 10-May- 17-May- 23-Jul- Doxx Computers 5B CARMAC2-PG-16-10 G SH Post 6 16 16 May- 16 6.03 LLC 16 Information Dissemination 201 6 (leaflets,sign-boards, etc) G SH Post 5 TBD Contra CARMAC2-PG-15-04 201 9-Jun- 9-Aug- 6A (Booklet) G SH Post 5 1-Jun-15 1-Jun-15 8-Jun-15 15 15 0.33 Uniprint LLC Contra CARMAC2-PG-16-11 201 10-Jun- 13- 23- 6B (Register) G SH Post 6 1-Jun-16 3-Jun-16 16 Jun-16 Jun-16 0.53 Uniprint LLC 201 7 Office furniture for PIU and MSTs G SH Post 5 TBD Contra CARMAC2-PG-15-03 201 29-May- 11- 11-Jul- 7A (Furniture) for MTS G SH Post 5 29-May-15 15 8-Jun-15 Jun-15 15 3.56 PE H.Avetisyan 25- Contra CARMAC2-PG-15-08 201 10-Nov- 17-Nov- 24- G SH Post 29-May-15 Nov- 4.05 PE H.Avetisyan (Furniture) for APIU 5 15 15 15 Jan-16 Commun. Vets equipment and 201 8 consumables G SH Post 6 Equipment and furnitures for 201 9 VSCs G SH Post 6 30- Safeguard system for Mets Parni 201 17-Aug- 17-Aug- 24-Aug- 1-Sep- 9A VSC G SH Post 7 7-Aug-17 17 17 17 17 Sep- 17 30- 1C software with scanning 201 18-Aug- 18-Aug- 25-Aug- 1-Sep- 9B equipment for Mets Parni VSC G SH Post 7 7-Aug-17 17 17 17 17 Sep- 17 201 10 Medicines and supplies for VSCs G SH Post 6 11- Analitical and Lab Equipment for 13, 201 Local Food Inspectors, SSFS, G NCB Post 16- CV&P, SVC 6 17 Furniture for SSFS One stop shop 15- 25- 11 201 14-Feb- Contra CARMAC2-PG-17-16 (SSFS G SH Post 25-Jan-17 3-Feb-17 8-Feb-17 Feb- Feb- 7.18 Gaudi LLC A Furniture) 7 17 16 16 IT Equipment for SSFS One stop 15- 11 201 15-Feb- 6-Mar- shop Contra CARMAC2- G SH Post 25-Jan-17 3-Feb-17 9-Feb-17 Feb- 3.51 SRS-Zvezda LLC B PG-17-17 (SSFS Equipm) 7 17 16 16 Field equipment for SVC 30- Concern (Scientific Center for Vegetables) 201 20-Oct- 28-Oct- 9-Nov- 30- 14 Contra CARMAC2-PG-15-07 (GH G SH Post 5 20-Jul-15 15 15 15 Nov- Jun-17 70.85 Energomash 15 CJSC Equip) Field equipment for SVC 14 (Scientific Center for Vegetables) 201 26-Aug- 26-Aug- 5-Sep- 4-Oct- 3-Dec- G SH Post 26-Aug-16 27.33 SpecmashLLC A Contra CARMAC2-PG-16-13 (GH 6 16 16 16 16 16 Equip) Greenhouse equipment for SCV 201 23-Sep- 23-Sep- 3-Oct- 7-Oct- 6-Dec- HGH Company 15 Contra CARMAC2-PG-16-14 (GH G SH Post 6 23-Sep-16 16 16 16 16 16 33.10 LLC Equip) Office equipment (IT and 201 30-Jan- 19-Feb- 5-Apr- 4-Jun- 18 furniture) for SCV G SH Post 6 10-Jan-17 17 4-Feb-17 17 17 17 Analytical Equipment for Concern 201 10-Feb- 15-Feb- 25-Feb- 1-Mar- 1-May- 19 Agrochemical Center Contra G SH Post 7 10-Feb-17 17 17 17 17 17 86.28 Energomash CARMAC2-PG-17-18 (Lab Equip) CJSC 30- 29- Analytical Equipment for 201 1-Aug- 16-Aug- 20 Agrochemical Center G SH Post 8 7-Jul-18 27-Jul-18 18 18 Sep- Nov- 18 18 Additional IT equipment (MIS) 201 1-Sep- 11-Sep- 1-Oct- 1-Dec- Doxx Computers 21 Contra CARMAC2-PG-15-05 (MIS G SH Post 5 20-Jul-15 1-Sep-15 15 15 15 15 9.24 LLC Equipm) 677.3 13- 201 12-Feb- 14-Mar- 9-Nov- 22 VSC Civil works CW SH Post 6 9-Dec-16 7-Feb-17 17 17 May- 17 17 SSFS One stop shop renovation 15- 11- Master- 22 201 14-Feb- CW Contra CARMAC2-CW-17-6/02 CW SH Post 25-Jan-17 3-Feb-17 8-Feb-17 Feb- Mar- 30.07 Constracshen A (SSFS CW) 7 17 16 16 LLC SSFS One stop shop renovation 15- 11- 22 supervision 201 16-Feb- 9-Feb- CS CQ Post 25-Jan-17 Feb- Mar- 0.54 Micto HEK LLC B Contra CARMAC2-CW-17-6/02 7 16 17 16 16 (SSFS CW) 22 Contra CARMAC2-CW-16-5/01-04 1-Aug- 9-Aug- 6-Sep- QVE nakhagits 1-Aug-16 4.83 C (Parni VSC Design&Author) 16 16 16 LLC 22 Contra CARMAC2-CW-16-5/02 20-Sep- 20-Sep- 30-Sep- 7-Oct- 9-Jun- 20-Sep-16 94.77 Vordi Hrair LLC D (Parni VSC CW) 16 16 16 16 17 22 Contra CARMAC2-CW-16-5/03 13-Sep- 7-Oct- 9-Jun- 13-Sep-16 1.86 Alternative LLC E (Parni VSC Supervision) 16 16 17 Reconstruction of Glass 201 23 Greenhouses for SCV CW SH Post 5 Contra CARMAC2-CW-15-1/01-04 23 201 15-May- 1-Jun- 31-Jul- (Glass Greenhouse CS CQ Post 4-Feb-15 5.95 HGSHN LLC A Design&Author) 5 15 15 15 23 Contra CARMAC2-CW-15-1/02 201 25-Sep- 15-Oct- 30- 2-May- CW SH Post 31-Jul-15 5-Oct-15 202.20 Saz-Agro LLC B (Glass Greenhouse CW) 5 15 15 Oct-15 16 23 Contra CARMAC2-CW-15-1/03 201 15-Oct- 30- 2-May- Shinindustria CS CQ Post 4-Feb-15 2.96 C (Glass Greenhouse Supervis) 5 15 Oct-15 16 LLC Reconstruction of Glass 201 CW SH Post Greenhouses for SCV 6 Contra CARMAC2-CW-16-4/01-04 31- 23 201 16-Feb- 19-Jul- 29-Jul- (Glass Greenhouse CS CQ Post Aug- 7.90 HGSHN LLC D Design&Author) 6 16 16 16 16 22- 23- 23 Contra CARMAC2-CW-16-4/02 201 25-Sep- 30-Aug- 9-Sep- Nik-Dav Group CW SH Post 19-Sep-15 Sep- May- 199.28 E (Glass Greenhouse CW) 6 15 16 16 16 17 CJSC 22- 23- 23 Contra CARMAC2-CW-16-4/03 201 16-Feb- 1-Sep- Shinindustria CS CQ Post Sep- May- 3.25 F (Glass Greenhouse Supervis) 6 16 16 16 17 LLC Refurbishment of Plastic 24 Greenhouses for SCV CW SH 24 201 SCV Plastic Greenhouses CW CW SH Post 7-Apr-17 A 7 24 SCV Plastic Greenhouses 201 CS CQ Post B Supervision 7 24 201 SCV improvement CW CW SH Post 7-Mar-17 C 7 24 201 SCV improvement CW Supervision CS CQ Post D 7 Refurbishment of Phytopathology 201 25 Lab CW SH Post 5 10-Nov-15 Contra CARMAC2-CW-15-2/01-04 10- 10- 25 201 2-Sep- (Glass Greenhouse CS CQ Post 4-Feb-15 Sep- Nov- 9.28 HGSHN LLC A Design&Author) 5 15 15 15 10- 25 Contra CARMAC2-CW-15-2/02 201 30-Oct- 30-Oct- 9-Nov- 7-Jun- Hydroveranorog CW SH Post 30-Oct-15 Dec- 197.38 B (Glass Greenhouse CW) 5 15 15 15 15 16 um LLC 10- 25 Contra CARMAC2-CW-15-2/03 201 25-Nov- 7-Jun- Shinindustria CS CQ Post 4-Feb-15 Dec- 2.57 C (Glass Greenhouse Supervision) 5 15 15 16 LLC Reconstruction of Glass 201 CW SH Post Greenhous Boiler for SCV 6 Contra CARMAC2-CW-16-3/01-04 29- 25 201 20- (Glass Greenhouse Boiler CS CQ Post 4-Feb-15 8-Jan-16 Feb- 9.52 HGSHN LLC D Design&Author) 6 Jan-16 16 25 Contra CARMAC2-CW-16-3/02 201 11-Apr- 6-May- 6-Jan- Hydroveranorog CW SH Post 4-Mar-16 1-Apr-16 1-Apr-16 194.22 E (Glass Greenhouse Boiler CW) 6 16 16 17 um LLC Contra CARMAC2-CW-16-3/03 25 201 16-Feb- 29-Apr- 6-May- 6-Jan- Shinindustria (Glass Greenhouse Boiler CS CQ Post 3.15 F Supervision) 6 16 16 16 17 LLC 969.7 Prior/ 201 27 Preparation of PLMDP CS QCBS/ CQ Post 5 Preparation of PLMDP for 50 15- 15- 28- 27 201 22-Mar- 25-Mar- 9-Apr- communities Contra CS CQ Prior 10-Mar-15 Mar- May- Feb- 192.00 Wide Gate LLC A CARMAC2-CS-15/02 (PMP) 5 15 15 15 15 15 16 Preparation of PLMDP for 50 27- 28- 27 201 20- 27-Apr- 29-Apr- 14-May- communities Contra CS CQ Post 15-Apr-16 May- Feb- 187.30 Wide Gate LLC B CARMAC2-CS-16/13 (PMP) 6 Apr-16 16 16 16 16 17 27 Preparation of PLMDP for 4 201 29-May- 13-Jun- 3-Jul- 30- CS CQ Post 29-May-17 15.42 Wide Gate LLC C communities 7 17 17 17 Oct-17 Ongoing 201 through 28 Grassland/pasture expert CS IC Post 6 the Project 201 29 Expert depending on needs CS IC Post 5 Community Development expert 12- 29 201 14-May- 15-May- 3-Jun- 30- Contra CARMAC2-CS-15/07 CS IC Post 10-May-15 May- 1-Jun-15 21.79 T. Apoyan A (ComDev Spec) 5 15 15 15 15 Jun-17 Community Development 29 consultant for Gegharkunik MST 201 3-Dec- 11-Dec- 25-Dec- 1-Feb- 30- CS IC Post 1-Dec-15 8-Dec-15 4.18 G.Badalyan B Contra CARMAC2-CS-16/09 6 15 15 15 16 Jun-17 (ComDev Spec) Ongoing 201 through 30 Livestock economist local expert CS IC Post 6 the Project Ongoing Other local TA depending on 201 through 31 emerging needs CS IC Post 6 the Project Preparation of vegetation 31 recovery measures for degraded 201 1-May- 15-May- CS IC Post 1-Dec-15 1-May-17 A nearby village pastures of the 7 17 17 communities Women/Youth Special Support 201 6-Aug- 13-Aug- 16-Aug- 31-Aug- 35 Program CS CQ Post 6 1-Aug-17 17 17 17 17 30- 30- Technical Review Contra 201 10- 24-Jun- 24-Jun- 36 CARMAC2-CS-15/05 (Value Chain) CS CQ Post 5 1-Apr-15 Jun-15 15 15 8-Jul-15 Sep- Dec- 32.00 AM Partners LLC 15 16 201 37 Selection Committee meetings CS IC Post 5 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/1 CS IC***** Post 1-Jul-15 1.05 A.Gasparyan 5 15 15 15 18 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/2 CS IC***** Post 1-Jul-15 0.7 H.Tspnetsyan 5 15 15 15 18 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/3 CS IC***** Post 1-Jul-15 0.7 G.Ghazaryan 5 15 15 15 18 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/4 CS IC***** Post 1-Jul-15 0.7 M.Saponjyan 5 15 15 15 18 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/5 CS IC***** Post 1-Jul-15 0.7 Kh.Poghosyan 5 15 15 15 18 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/6 CS IC***** Post 1-Jul-15 0.7 N.Darbinyan 5 15 15 15 18 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/7 CS IC***** Post 1-Jul-15 0.7 G.Sardaryan 5 15 15 15 18 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/8 CS IC***** Post 1-Jul-15 0.7 G.Sargsyan 5 15 15 15 18 201 18-May- 18-May- 1-Jul- 1-Jul- Contra ASHZH-1/9 CS IC***** Post 1-Jul-15 0.7 L.Aydinyan 5 15 15 15 18 28- Evaluation of all sub-project 201 4-May- 11-May- 4-May- 18-May- 19- 38 investments CS CQ Post 7 1-Apr-17 17 17 17 17 Jun-17 Feb- 12.00 Argument LLC 18 10- 201 6-Jan- 13-Jan- 16-Jan- 31-Jan- 39 Dairy/Livestock specialist CS IC Post 6 1-Jan-17 17 17 17 17 Feb- 17 10- 201 6-Jan- 13-Jan- 16-Jan- 31-Jan- 40 Horticulture specialist CS IC Post 6 1-Jan-17 17 17 17 17 Feb- 17 Other local expert depending on 201 41 emerging needs CS IC Post 5 Food Safety specialist for the VCD 41 201 8-Jul- 11-Aug- 13-Aug- 27-Aug- 1-Sep- 30- Contra CARMAC2-CS-15/08 (Food CS IC Post 8-Jul-15 19.06 G. Hovhannisyan A Safety Spec) 5 15 15 15 15 15 Jun-17 27- CARD Mobilisation of comm. Vets 201 11-Mar- 11-Mar- 4-May- 27- 42 Contra CARMAC2-CS-16/10 CS CQ Post 6 1-Mar-16 16 16 16 Jun-16 Dec- 54.35 Agroservice 17 CJSC 13- 201 6-Feb- 13-Feb- 16-Feb- 3-Mar- 43 Impact evaluation CS CQ Post 9 1-Feb-19 19 19 19 19 Mar- 19 Training of Local Food Safety IMS LLC & 201 11-Mar- 11-Mar- 29-Mar- 6-May- 7-Oct- Irazek ev 44 Inspectors Contra CS CQ Post 6 1-Mar-16 16 16 16 16 16 50.06 pashpamvac CARMAC2-CS-16/11 sparogh NGO GAP Survey for preparation of 201 6-Apr- 13-Apr- 16-Apr- 1-May- 45 guidelines CS CQ Post 6 1-Apr-17 17 17 17 17 Guidelines preparation, printing, 201 6-Jun- 13-Jun- 46 dissemination CS TBD Post 7 1-Jun-17 17 17 20- Guidelines preparation, printing, 201 27-Feb- 9-Mar- 5-Sep- 47 dissemination CS TBD Post 8 15-Feb-18 Feb- 18 18 18 18 Environmental specialist 201 1-Apr- 13-Apr- 15-Apr- 29-Apr- 5-May- 30- 48 Contra CARMAC2-CS-15/06 CS IC Post 5 1-Apr-15 15 15 15 15 15 Jun-17 15.24 A. Savadyan (Environmenthal Spec) Social specialist 12- 201 16-Mar- 24-Mar- 6-Apr- 4-May- 30- 49 Contra CARMAC2-CS-15/04 (Social CS IC Post 5 10-Mar-15 Mar- 15 15 15 15 Jun-17 23.02 E. Mkrtchyan Spec) 15 Ongoing 201 through 50 Short-term consultancies (local) CS IC Post 6 the Project Development of MIS 201 5-Mar- 12-Mar- 15-Mar- 30-Mar- 1-Jun- 30- 52 Contra CARMAC2-CS-15/03 (MIS) CS CQ/IC Post 5 28-Feb-15 15 15 15 15 15 Oct-15 38.14 Shogersoft LLC 15- External Evaluation & Impact 201 22-Aug- 25-Aug- 9-Sep- 53 Assessment CS CQ Post 7 10-Aug-17 Aug- 17 17 17 17 To be Special studies on erosion control, 201 54 biodiversity, etc. CS CQ/IC Post 8 determin ed 201 6-Mar- 13-Mar- 16-Mar- 31-Mar- 10- 55 Public awareness CS CQ Post 7 1-Mar-17 17 17 17 17 Apr-17 18- 30- 201 21-Feb- 22-Feb- 15-Mar- 4-Apr- 56 Audit Contra CARMAC2-CS-16/12 CS LCS Post 5 18-Feb-16 Feb- 16 16 16 16 Dec- 51.98 SOS Audit LLC 16 20 723.2 Ongoing Grant NCB/SH/CQ/F Prior/ 201 through 57 Community Funds (1 year) s A Post** 5 the 1895.00 Project Ongoing Grant NCB/SH/CQ/F 201 through 58 Community Funds (2 year) s A Post 6 the 7293.70 Project Ongoing Grant NCB/SH/CQ/F 201 through 59 Community Funds (3 year) s A Post 7 the Project Ongoing 60- Sub-projects under Component 2 Grant 201 through SH/CQ Post 1075 61 including Beneficiary contribution s 5 the Project 10,263 .7 Ongoing Operating Costs for 201 through 62 Components 1 - 4 SOE Post 5 the Project Ongoing Training under Component 1 TR*** 201 through 26 (Component staff) * NA Post 6 the Project Ongoing Trainings on PMC TR*** 201 through 32 Mobilization/Planning * NA Post 5 the Project Ongoing PMC Annual Planning Meetings (2 TR*** 201 through 33 per year) * NA Post 5 the Project Special trainings on the role of Ongoing PMC, pasture management, TR*** 201 through 34 feeding and feed management, * NA Post 5 the animal nutrition, etc. Project Ongoing Training under Component 4 TR*** 201 through 51 (staff training abroad, finance, * NA Post 4 the procurement, other) Project PROCUREMENT Armenia : Second Community Agriculture Resource Management and Competitiveness Project PLAN General Information Country: Armenia Bank’s Approval Date of the Original Procurement Plan: 2017-11-06 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P133705 GPN Date: Project Name: Second Community Agriculture Resource Management and Competitiveness Project Loan / Credit No: IBRD / 83740 Ministry of Agriculture of RA Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARMAC2-CP-15/02 / Construction of the watering Component 1: Request for system in Lichk community of IBRD / 83740 Community/Pasture Livestock Prior Open - International 74,563.87 Signed 2015-07-29 Quotations Gegharquniq marz of the RA Management System for Lichk community needs NCB-CARMAC2-CP-15-A- 1/02 / Procurement of Civil Component 1: works for construction of Single Stage - One IBRD / 83740 Community/Pasture Livestock Prior Request for Bids Open - National 290,048.82 Signed 2016-05-23 2016-05-30 watering system in Artashavan Envelope Management System community pastures of Aragotsotn marz of the RA CARMAC2-CP-18-V-6/02 / Construction of the watering Component 1: Request for Single Stage - One 2018-06- system in Karmrashen IBRD / 83740 Community/Pasture Livestock Post Limited 59,503.55 Signed 2018-01-23 2018-07-19 2018-02-19 2018-08-24 Quotations Envelope 19 community of Vayots Dzor Management System marz of the RA CARMAC2-CW-18-4/02 / Component 3: Strengthening Request for Single Stage - One 2018-05- Refurbishment of Plastic IBRD / 83740 Post Limited 77,407.95 Signed 2017-12-18 2018-02-21 2018-01-18 2018-04-05 Public Sector Institutions Quotations Envelope 18 Greenhouses for SCV CARMAC2-CP-17-G-15/02 / Construction of the watering Component 1: Single Stage - One 2019-08- system in Vaghashen IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 440,209.79 Signed 2018-02-07 2018-04-16 2018-02-14 2018-03-14 2018-05-07 2018-04-13 2018-06-29 2018-05-12 2018-08-02 Envelope 05 community of Gegharquniq Management System marz of the RA CARMAC2-CP-18-SH-7/02 / Construction of the watering Component 1: Request for Single Stage - One 2018-07- system in Aghvorik IBRD / 83740 Community/Pasture Livestock Post Limited 89,709.18 Signed 2018-01-30 2018-05-04 2018-02-22 2018-06-13 Quotations Envelope 22 community of Shirak marz of Management System the RA CARMAC2-PG-18-25 / Component 3: Strengthening Request for Single Stage - One 2018-06- Procurement of refrigeration IBRD / 83740 Post Limited 0.00 Canceled 2018-03-03 2018-02-28 2018-04-03 Public Sector Institutions Quotations Envelope 02 equipment CARMAC2-CP-18-S-J-1/02 / Const. of a waterwashing water line in Kornidzor community pastures, Component 1: installation of 1 drinking Request for Single Stage - One 2018-07- IBRD / 83740 Community/Pasture Livestock Post Limited 78,470.25 Signed 2018-03-17 2018-06-14 2018-04-17 2018-08-20 water, road profiling and Quotations Envelope 16 Management System smoothing works and const. of irrigation system in the pastures of N.Kndzoresk and Tashtun communities CARMAC2-CP-18-S-J-2/02 / Component 1: Construction of irrigation Request for Single Stage - One 2018-08- IBRD / 83740 Community/Pasture Livestock Post Limited 61,740.45 Signed 2018-03-19 2018-06-14 2018-04-19 2018-08-03 system in Balaq and Vorotan Quotations Envelope 17 Management System community pastures CARMAC2-CP-18-T-J-1/02 / Component 1: Construction of irrigation Request for Single Stage - One 2018-07- IBRD / 83740 Community/Pasture Livestock Post Limited 38,736.65 Signed 2018-03-21 2018-09-07 2018-04-21 2018-10-15 system in V. Tsakhkavan and Quotations Envelope 20 Management System Movses community pastures CARMAC2-CP-17-A-6/02 / Component 1: Construction of the watering Request for Single Stage - One 2018-09- IBRD / 83740 Community/Pasture Livestock Post Limited 185,421.03 Signed 2018-02-07 2018-02-07 2018-03-23 2018-04-05 system in Aparan community Quotations Envelope 19 Management System of Aragatsotn marz of the RA CARMAC2-CP-18-L-7/02 / Component 1: Construction of the watering Request for Single Stage - One 2018-05- IBRD / 83740 Community/Pasture Livestock Post Limited 58,769.35 Signed 2017-12-14 2018-02-21 2018-01-15 2018-04-19 system in Jrashen community Quotations Envelope 30 Management System of Lori marz of the RA CARMAC2-CP-18-G-J-1/02 / Construction of the watering Component 1: Request for Single Stage - One 2018-09- system in Chambarak and IBRD / 83740 Community/Pasture Livestock Post Limited 92,183.03 Signed 2018-05-09 2018-07-17 2018-06-09 2018-08-16 Quotations Envelope 07 Vahan communities of Management System Gegharquniq marz of the RA CARMAC2-CP-18-K-6/02 / Component 1: Construction of the watering Request for Single Stage - One 2018-12- IBRD / 83740 Community/Pasture Livestock Post Limited 160,014.08 Signed 2018-05-12 2018-06-14 2018-06-12 2018-08-06 system in Kaputan community Quotations Envelope 09 Management System of Kotayq marz of the RA CARMAC2-CP-18-G-J-2/02 / Construction of the watering system in settlement Aghberq Component 1: of Shoghakat community, in Request for Single Stage - One 2019-02- IBRD / 83740 Community/Pasture Livestock Post Limited 151,049.62 Signed 2018-06-18 2018-10-15 2018-07-19 2018-11-13 settlement Aygut of Quotations Envelope 14 Management System Chambarak community and Varser community of Gegharquniq marz of the RA Page 1 CARMAC2-CP-18-K-7/02 / Construction of the watering Component 1: Request for Single Stage - One 2019-01- system in settlement Arzakan IBRD / 83740 Community/Pasture Livestock Post Limited 0.00 Canceled 2018-06-20 2018-07-03 2018-07-21 Quotations Envelope 21 of Charencavan community of Management System Kotayq marz of the RA CARMAC2-CP-18-G-21/02 / Construction of the watering Component 1: Request for Single Stage - One 2019-02- system in community IBRD / 83740 Community/Pasture Livestock Post Limited 71,952.44 Signed 2018-09-03 2018-10-25 2018-10-04 2018-12-28 Quotations Envelope 01 Akhpradzor of Gegharqunik Management System marz CARMAC2-CP-18-K-7/02-1 / Construction of the watering Component 1: Request for Single Stage - One 2019-03- system in settlement Arzakan IBRD / 83740 Community/Pasture Livestock Post Open - National 0.00 Canceled 2018-08-21 2018-09-26 Quotations Envelope 29 of Charencavan community of Management System Kotayq marz of the RA CARMAC2-CW-18-7/02 / Construction of a veterinary Component 3: Strengthening Request for Single Stage - One 2019-05- IBRD / 83740 Post Open - National 0.00 Canceled 2018-11-13 2018-12-17 service center in Hrazdan city Public Sector Institutions Quotations Envelope 16 community of Kotayk marz CARMAC2-CW-19-7/02 / Construction of a veterinary Component 3: Strengthening Request for Single Stage - One 2020-06- IBRD / 83740 Post Limited 0.00 Canceled 2019-10-15 2019-12-10 service center in Hrazdan city Public Sector Institutions Quotations Envelope 07 community of Kotayk marz CARMAC2-CW-20-7/02 / Construction of a veterinary Component 3: Strengthening Request for Single Stage - One 2020-06- IBRD / 83740 Post Open - National 0.00 Canceled 2019-11-20 2020-01-10 service center in Hrazdan city Public Sector Institutions Quotations Envelope 08 community of Kotayk marz CARMAC2-CP-20-GK-1/02 / Construction of the watering system in Khachaghbyur Component 1: community of Gegharquniq Single Stage - One 2020-09- IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 0.00 Canceled 2019-11-20 2019-11-25 2019-12-23 2020-01-12 2020-02-09 marz and in settlement Envelope 06 Management System Arzakan of Charentsavan community of Kotayk marz of RA CARMAC2-CP-19-GK-1/02 / Construction of the watering system in Khachaghbyur Component 1: community of Gegharquniq Single Stage - One 2020-09- IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 227,330.44 Signed 2019-11-20 2020-02-19 2019-11-25 2019-12-23 2020-03-19 2020-02-01 2020-04-21 2020-03-07 2020-06-16 marz and in settlement Envelope 23 Management System Arzakan of Charentsavan community of Kotayk marz of RA N. CARMAC2-CW-19-7/02 / Construction of a veterinary Component 3: Strengthening Request for Single Stage - One 2020-06- IBRD / 83740 Post Open - National 0.00 Canceled 2019-11-20 2020-02-01 service center in Hrazdan city Public Sector Institutions Quotations Envelope 30 community of Kotayk marz CARMAC2-CP-19-J-2/02 / Construction of water supply Component 1: Single Stage - One 2020-10- pipeline systems in pastures IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 213,434.26 Signed 2020-01-14 2020-01-22 2020-01-19 2020-02-16 2020-02-21 2020-03-17 2020-05-14 2020-04-17 2020-06-16 Envelope 14 of Gegharquniq, Syuniq, Lori Management System and Aragatsotn marzes of RA CARMAC2-CP-20-T-J-2/02 / Construction of pasture water supply pipeline systems in Ditavan and N.Karmir Aghbyur Component 1: Single Stage - One 2021-03- communities, Varagavan and IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 133,425.18 Signed 2020-05-14 2020-05-15 2020-05-15 2020-06-04 2020-06-04 2020-07-04 2020-06-18 2020-07-19 2020-07-09 Envelope 16 Berd settlements of Berd Management System community, Koti settlement of Noyemberyan community, Tavush Marz CARMAC2-CP-20-S-J-4/02 / Construction of pasture water supply pipeline systems in Component 1: Single Stage - One 2021-04- Lor, Noravan and Nzhdeh IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 123,326.58 Signed 2020-05-26 2020-05-26 2020-05-28 2020-06-17 2020-06-16 2020-07-17 2020-07-06 2020-08-06 2020-08-13 Envelope 04 settlements of Sisian Management System commynity of Syuniq marz of RA. CARMAC2-CW-19-7/02/2 / Construction of a veterinary Component 3: Strengthening Single Stage - One 2021-02- IBRD / 83740 Post Request for Bids Open - National 103,476.95 Signed 2020-06-03 2020-01-17 2020-06-13 2020-07-11 2020-02-17 2020-09-09 2020-04-17 2020-09-24 2020-05-11 service center in Hrazdan city Public Sector Institutions Envelope 06 community of Kotayk marz CARMAC2-CP-20-J-5/02 / Construction of pasture water supply pipeline system in of Component 1: Hartashen settlement of Single Stage - One 2021-07- IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 346,389.81 Signed 2020-06-04 2020-06-05 2020-06-05 2020-06-25 2020-06-25 2020-07-25 2020-07-27 2020-08-11 2020-08-27 Sarapat community of Shirak Envelope 12 Management System Marz, and Quchak settlement of Aparan community of Aragatsotn Marz. CARMAC2-CP-20-K-J-6/02 / Construction of pasture water supply pipeline system in Component 1: Single Stage - One 2021-06- Qarashamb community and IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 101,486.93 Signed 2020-09-09 2020-10-09 2020-09-14 2020-10-05 2020-11-05 2020-11-14 2020-11-23 2020-12-15 2021-01-12 Envelope 18 Bjni settlement of Management System Charentsavan community, Kotayq Marz. CARMAC2-CP-20-S-11/02 / Construction of pasture water Component 1: supply pipeline system in Request for Single Stage - One 2021-02- IBRD / 83740 Community/Pasture Livestock Post Limited 0.00 Canceled 2020-09-20 2020-10-25 2020-10-13 Goris city settlement of Goris Quotations Envelope 12 Management System community, Syuniq marz of RA CARMAC2-CP-20-S-11/02/1 / Construction of pasture Component 1: water supply pipeline system Request for Single Stage - One 2021-05- IBRD / 83740 Community/Pasture Livestock Post Open - National 27,283.93 Signed 2020-12-10 2021-01-10 2021-03-03 in Goris city settlement of Quotations Envelope 15 Management System Goris community, Syuniq marz of RA Page 2 CARMAC2-CP-20-J-5/02-1 / Construction of pasture water Component 1: supply pipeline system in Single Stage - One 2021-08- IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 180,162.47 Signed 2020-12-15 2020-12-18 2020-12-17 2021-01-14 2021-01-18 2021-01-25 2021-02-02 2021-02-24 2021-03-23 Quchak settlement of Aparan Envelope 28 Management System community of Aragatsotn Marz CARMAC2-CP-21-J-SH-7/02 / Construction of pasture water supply pipeline systems Component 1: Single Stage - One 2021-11- in Ghazanchi, Mets Sepasar IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 431,188.81 Signed 2021-02-08 2021-02-11 2021-02-13 2021-03-15 2021-03-05 2021-04-14 2021-03-31 2021-05-22 2021-05-06 Envelope 23 and Zuygaghbyur settlements Management System of Ashotsk community of Shirak marz of RA GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARMAC2-NCB-15-01-1 / Component 1: Single Stage - One Procurement of Short Base 3 IBRD / 83740 Community/Pasture Livestock Prior Request for Bids Open - National 84,909.49 Completed 2015-06-16 2015-06-26 2015-06-29 Envelope doors 4WD Vehicles Management System CARMAC2-NCB-15-01/2 / Component 1: Single Stage - One Procurement of short Base 5 IBRD / 83740 Community/Pasture Livestock Prior Request for Bids Open - National 98,780.84 Completed 2015-06-16 2015-07-14 2015-08-12 Envelope doors 4WD Vehicles Management System CARMAC2-CP-J-15-01 / Component 1: Request for Procurement of Balers for IBRD / 83740 Community/Pasture Livestock Prior Open - International 47,000.00 Completed 2015-06-16 2015-07-20 Quotations PUCs Management System CARMAC2-PG-15-02 / Component 1: Request for Procurement of IT equipment IBRD / 83740 Community/Pasture Livestock Prior Open - International 11,610.05 Completed 2015-06-22 2015-06-24 Quotations for MSTs Management System CARMAC2-CP-J-17-54 / Component 1: General-purpose crawler Request for Single Stage - One IBRD / 83740 Community/Pasture Livestock Post Limited 47,900.00 Completed 2017-12-06 2017-11-30 2017-12-25 2017-12-28 2018-02-23 2018-03-28 tractor (min 90 h.p., quantity: Quotations Envelope Management System 1) CARMAC2-CP-J-17-55 / Component 1: Request for Single Stage - One General purpose wheel IBRD / 83740 Community/Pasture Livestock Post Limited 87,800.00 Completed 2017-12-08 2017-12-05 2017-12-27 2017-12-27 2018-02-25 2017-12-28 Quotations Envelope tractors (4 pc) Management System CARMAC2-PG-18-22 / Procurement of Lab Component 3: Strengthening Single Stage - One equipment for Scientific IBRD / 83740 Post Request for Bids Open - National 113,671.09 Completed 2018-01-18 2018-04-04 2018-01-23 2018-03-06 2018-04-25 2018-04-05 2018-05-07 2018-05-10 2018-05-29 2018-11-06 2018-07-17 Public Sector Institutions Envelope Center of Vegetable and Industrial Crops of MoA (SCV) Component 1: CARMAC2-CP-J-17-56 / Request for Single Stage - One IBRD / 83740 Community/Pasture Livestock Post Limited 0.00 Canceled 2017-12-14 2017-12-20 2017-12-29 2018-02-27 Agricultural machinery Quotations Envelope Management System Component 1: CARMAC2-CP-J-18-56 / Request for Single Stage - One IBRD / 83740 Community/Pasture Livestock Post Limited 94,022.49 Completed 2018-02-02 2018-02-02 2018-03-02 2018-02-23 2018-05-01 2018-03-26 Agricultural machinery Quotations Envelope Management System CARMAC2-PG-17-21 / Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Limited 0.00 Canceled 2017-12-13 2018-01-24 2017-12-28 2018-02-26 Veterinary Equipment Public Sector Institutions Quotations Envelope CARMAC2-PG-18-23 / Component 3: Strengthening Request for Single Stage - One Procurement of Furniture for IBRD / 83740 Post Limited 0.00 Canceled 2017-12-14 2018-02-01 2017-12-28 2018-02-26 Public Sector Institutions Quotations Envelope SCV CARMAC2-PG-18-23-2 / Component 3: Strengthening Request for Single Stage - One Procurement of furniture for IBRD / 83740 Post Limited 0.00 Canceled 2018-03-03 2018-02-28 2018-04-03 2018-06-02 Public Sector Institutions Quotations Envelope SVC CARMAC2-PG-17-21-2 / Procurement of Veterinary Component 3: Strengthening Request for Single Stage - One Equipment for veterinarians of IBRD / 83740 Post Limited 57,090.39 Completed 2018-03-05 2018-02-28 2018-04-05 2018-03-27 2018-06-04 2018-05-25 Public Sector Institutions Quotations Envelope Kotayq and Vayots Dzor marzes CARMAC2-PG-18-24 / Component 3: Strengthening Request for Single Stage - One Procurement of IT Equipment IBRD / 83740 Post Limited 0.00 Canceled 2017-12-15 2018-02-01 2017-12-29 2018-02-27 Public Sector Institutions Quotations Envelope for SCV CARMAC2-PG-18-24-2 / Component 3: Strengthening Request for Single Stage - One Procurement of IT Equipment IBRD / 83740 Post Limited 0.00 Canceled 2018-03-07 2018-03-02 2018-04-03 2018-06-02 Public Sector Institutions Quotations Envelope for SCV CARMAC2-PG-17-20 / 1C Component 3: Strengthening Request for Single Stage - One software with scanning IBRD / 83740 Post Limited 0.00 Canceled 2017-12-13 2018-02-05 2017-12-28 2018-01-27 Public Sector Institutions Quotations Envelope equipment for Mets Parni VSC CARMAC2-PG-17-20-2 / 1C Component 3: Strengthening Request for Single Stage - One software with scanning IBRD / 83740 Post Limited 0.00 Canceled 2018-03-07 2018-03-02 2018-04-03 2018-05-03 Public Sector Institutions Quotations Envelope equipment for Mets Parni VSC Component 1: CARMAC2-CP-NCB-J-18-57 Single Stage - One IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 291,357.58 Completed 2018-02-28 2018-03-02 2018-03-02 2018-03-16 2018-03-16 2018-03-30 2018-03-21 2018-04-27 2018-03-26 2018-07-26 2018-05-18 / Procurement of tractors Envelope Management System CARMAC2-PG-18-23-2/1 / Component 3: Strengthening Request for Single Stage - One Procurement of furniture for IBRD / 83740 Post Open - National 3,257.20 Completed 2018-04-18 2018-05-28 2018-06-20 2018-07-27 2018-08-07 Public Sector Institutions Quotations Envelope SVC Page 3 CARMAC2-PG-18-24-2/1 / Component 3: Strengthening Request for Single Stage - One Procurement of IT Equipment IBRD / 83740 Post Limited 0.00 Canceled 2018-04-18 2018-05-21 2018-07-20 Public Sector Institutions Quotations Envelope for SCV CARMAC2-PG-18-20-2/1 / Component 3: Strengthening Request for Single Stage - One 1C software with scanning IBRD / 83740 Post Open - National 0.00 Canceled 2018-04-18 2018-05-23 2018-07-22 Public Sector Institutions Quotations Envelope equipment for Mets Parni VSC CARMAC2-PG-18-25-2 / Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 0.00 Canceled 2018-04-18 2018-05-23 2018-07-22 Procurement of refrigerators Public Sector Institutions Quotations Envelope CARMAC2-CP-NCB-J-18-59 Component 1: Single Stage - One / Procurement of agricultural IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 0.00 Canceled 2018-05-10 2018-05-11 2018-05-17 2018-06-07 2018-06-04 2018-07-07 2018-08-01 2018-08-18 2018-10-17 Envelope machinery Management System CARMAC2-PG-18-24-2/2 / Component 3: Strengthening Request for Single Stage - One Procurement of IT Equipment IBRD / 83740 Post Open - National 5,623.45 Completed 2018-06-08 2018-07-13 2018-08-01 2018-09-11 2018-09-10 Public Sector Institutions Quotations Envelope for SCV CARMAC2-PG-18-26 / Procurement of Veterinary Component 3: Strengthening Request for Single Stage - One equipment for the Center IBRD / 83740 Post Limited 61,316.78 Completed 2018-06-20 2018-07-19 2018-07-20 2018-08-16 2018-09-18 2018-09-24 Public Sector Institutions Quotations Envelope Veterinary, Food Safety and Phitosanitary of RA MoA CARMAC2-CP-NCB-J-18-58 Component 1: Single Stage - One / Procurement of agricultural IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 0.00 Canceled 2018-03-26 2018-04-11 2018-04-02 2018-04-23 2018-05-03 2018-05-23 2018-06-01 2018-07-04 2018-09-02 Envelope machinery Management System CARMAC2-CP-NCB-J-18-58- Component 1: Single Stage - One 2 / Procurement of IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 166,066.38 Completed 2018-06-29 2018-07-25 2018-07-03 2018-07-17 2018-08-03 2018-07-31 2018-10-01 2018-08-28 2018-11-03 2018-10-27 2018-12-27 Envelope agricultural machinery Management System CARMAC2-CP-NCB-J-18-60 Component 1: Single Stage - One / Procurement of general IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 156,375.54 Completed 2018-07-04 2018-07-25 2018-07-08 2018-07-29 2018-08-16 2018-08-19 2018-10-18 2018-09-16 2018-10-27 2018-11-15 2018-12-24 Envelope purpose wheel tractors Management System CARMAC2-PG-18-25-2/2 / Procurement of refrigerators for the needs of the "Scientific Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 5,555.55 Completed 2018-08-01 2018-09-05 2018-09-07 2018-11-04 2018-09-13 Center for Vegetable and Public Sector Institutions Quotations Envelope Industrial Crops" SNCO of MoA of RA CARMAC2-CP-NCB-J-18-61 Component 1: Single Stage - One / Procurement of agricultural IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 147,795.91 Completed 2018-08-28 2018-09-13 2018-09-01 2018-09-22 2018-10-05 2018-10-13 2018-12-03 2018-11-10 2018-12-27 2019-01-09 2019-08-12 Envelope machinery Management System CARMAC2-PG-18-27 / Procurement of equipment Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 13,958.25 Completed 2018-08-25 2018-10-09 2018-11-19 2018-12-08 2018-12-24 for the Local Food Inspectors Public Sector Institutions Quotations Envelope of SSFS CARMAC2-PG-18-28 / Component 3: Strengthening Request for Single Stage - One Equipment for SSFS Central IBRD / 83740 Post Open - National 26,474.19 Completed 2018-10-22 2018-11-17 2018-12-14 2019-01-16 2019-03-05 Public Sector Institutions Quotations Envelope Lab CARMAC2-PG-18-29 / Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 42,564.38 Completed 2018-10-22 2018-11-17 2018-11-23 2019-01-16 2019-01-21 Agrochem Equipment Public Sector Institutions Quotations Envelope CARMAC2-CP-NCB-J-18-62 / Procurement of tractors and agricultural machines for PUA cooperatives of Varser, Vardenik, Lchashen, Martuni Component 1: Single Stage - One town, Shatvan, Aygut, Vahan IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 271,599.74 Completed 2018-10-22 2018-10-27 2018-10-26 2018-11-16 2018-11-21 2018-12-07 2018-12-20 2019-01-04 2019-01-18 2019-04-04 2019-04-14 Envelope of Gegharqunik marz, Njdeh, Management System Shaghat, Kornidzor, Vorotan, N.Khndzoresk of Syuniq marz, Hartagyugh of Lori marz, Akunq CARMAC2-CP-NCB-J-18-63 / Proc. of tractors and agricultural machines for PUA cooperatives of Ayrq, Martuni town, Shatvan, Vardenik, Component 1: Single Stage - One Aghberq of Gegharqunik IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 0.00 Canceled 2018-11-19 2018-12-17 2018-11-23 2018-12-14 2018-01-15 2019-01-04 2019-02-01 2019-05-02 Envelope marz, Njdeh, Shaghat of Management System Syuniq marz, Vernashen of Vayots Dzor marz, Gagarin of Lori marz and N.Armanos, Quchak of Aragatsotn CARMAC2-CP-NCB-J-19-63 / Procurement of tractors and Component 1: agricultural machines for PUA Single Stage - One IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 188,416.29 Completed 2019-10-10 2020-02-20 2019-10-15 2019-11-26 2020-03-16 2019-12-26 2020-04-07 2020-01-30 2020-04-14 2020-07-28 2020-05-25 cooperatives of Gegharqunik, Envelope Management System Syuniq, Vayots Dzor, Lori and Aragatsotn marzes. CARMAC2-CW-19-7/02 / Construction of a veterinary Component 3: Strengthening Single Stage - One IBRD / 83740 Post Request for Bids Open - National 0.00 Canceled 2019-12-09 2020-01-17 2019-12-19 2020-01-16 2020-02-17 2020-03-16 2020-04-07 2020-03-31 2020-08-13 service center in Hrazdan city Public Sector Institutions Envelope community of Kotayk marz CARMAC2-CP-NCB-J-20-64 / Procurement of tractors and agricultural machines for PUA Component 1: Single Stage - One cooperatives of Gegharqunik, IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 251,355.60 Completed 2020-04-06 2020-04-07 2020-04-08 2020-04-30 2020-04-30 2020-05-30 2020-06-11 2020-06-07 2020-07-23 2020-08-06 2020-10-18 Envelope Tavush, Vayots Dzor, Lori, Management System Kotayk and Aragatsotn marzes. Page 4 CARMAC2-CP-NCB-J-19- 63/LOTS3,4,6 / Procurement of tractors and agricultural Component 1: machines for PUA Single Stage - One IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 58,007.04 Completed 2020-06-16 2020-02-20 2020-06-17 2020-07-10 2020-03-16 2020-08-09 2020-04-07 2020-08-19 2020-05-11 2020-10-19 2020-07-31 cooperatives of Gegharqunik, Envelope Management System Syuniq, Vayots Dzor, Lori and Aragatsotn marzes (Lots 3, 4 and 6). CARMAC2-PG-20-31 / IT Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 0.00 Canceled 2020-06-24 2020-07-20 2020-09-18 equipment for ANAU Public Sector Institutions Quotations Envelope CARMAC2-PG-20-30 / Component 3: Strengthening Request for Single Stage - One Artificial insemination tools IBRD / 83740 Post Open - National 45,253.02 Completed 2020-06-24 2020-07-20 2020-08-12 2020-10-03 2020-12-07 Public Sector Institutions Quotations Envelope and training equipment CARMAC2-PG-18-20-3 / 1C Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 0.00 Canceled 2018-10-22 2018-11-17 2018-12-17 Equipment Public Sector Institutions Quotations Envelope CARMAC2-CP-NCB-J-20-65 / Procurement of tractors and Component 1: light trucks for PUA Single Stage - One IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 462,259.48 Completed 2020-07-07 2020-07-20 2020-07-08 2020-07-31 2020-08-11 2020-08-30 2020-09-09 2020-09-30 2020-10-05 2020-11-29 2020-12-02 cooperatives of Gegharqunik, Envelope Management System Vayots Dzor, Lori, Kotayk and Aragatsotn marzes. CARMAC2-CP-NCB-J-20-66 Component 1: / Procurement of agricultural Single Stage - One IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 180,754.69 Completed 2020-07-27 2020-07-30 2020-07-28 2020-08-20 2020-08-14 2020-09-19 2020-09-02 2020-10-20 2020-10-08 2020-12-19 2020-12-22 machines for PUA Envelope Management System cooperatives of RA marzes. CARMAC2-PG-20-33 / Artificial insemination Component 3: Strengthening Request for Single Stage - One equipment for Veterinary IBRD / 83740 Post Open - National 5,176.24 Completed 2020-09-21 2020-10-15 2020-11-16 2020-12-14 2021-01-12 Public Sector Institutions Quotations Envelope Center in Hrazdan community of Kotayq marz of RA CARMAC2-PG-20-32 / Furniture for Veterinary Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 5,749.54 Completed 2020-11-25 2020-10-17 2021-03-01 2020-12-17 2021-03-12 Center in Hrazdan community Public Sector Institutions Quotations Envelope of Kotayq marz of RA CARMAC2-CP-NCB-J-21-67 / Procurement of tractors and light trucks for PUA Component 1: Single Stage - One cooperatives of Gegharqunik, IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 464,877.15 Completed 2021-01-21 2021-01-29 2021-01-22 2021-02-11 2021-02-19 2021-03-03 2021-03-03 2021-04-01 2021-03-26 2021-05-31 2021-05-31 Envelope Vayots Dzor, Tavush, Syunik, Management System Kotayk and Aragatsotn marzes. CARMAC2-PG-21-35 / Procurement of special Pending Component 3: Strengthening Request for Single Stage - One vehicles for Mets Parni, IBRD / 83740 Post Open - National 0.00 Implementati 2021-03-04 2021-04-06 2021-07-06 Public Sector Institutions Quotations Envelope Hrazdan and Odzun on Veterinary Centers CARMAC2-CP-NCB-J-21-68 Component 1: Single Stage - One / Procurement of agricultural IBRD / 83740 Community/Pasture Livestock Post Request for Bids Open - National 186,910.36 Signed 2021-02-03 2021-02-05 2021-02-04 2021-02-23 2021-02-24 2021-03-14 2021-04-02 2021-04-14 2021-05-07 2021-06-14 Envelope machinery for 18 cooperatives Management System Under CARMAC2-PG-20-31-1 / IT Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 0.00 Implementati 2021-04-28 2021-05-30 2021-07-30 equipment for ANAU Public Sector Institutions Quotations Envelope on CARMAC2-PG-21-34 / Pending Equipment for Veterinary Component 3: Strengthening Request for Single Stage - One IBRD / 83740 Post Open - National 0.00 Implementati 2021-05-11 2021-06-07 2021-08-07 Center in Hrazdan community Public Sector Institutions Quotations Envelope on of Kotayq marz of RA NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARMAC2-CS-15/02 / Assessment of community Component 1: Consultant fodder areas and development IBRD / 83740 Community/Pasture Livestock Prior Qualification Open - International 189,743.63 Signed 2015-05-14 2015-05-15 of pasture management plans Management System Selection and mapping CARMAC2-CS-18/21 / Independent Evaluator for the Consultant Component 2: Value Chain Value Chain Development IBRD / 83740 Post Qualification Open - National 21,111.08 Signed 2018-02-01 2018-02-07 2018-02-15 2018-04-05 2018-03-23 2018-04-19 2018-04-03 2018-05-12 2018-04-03 2018-11-08 Development Component finished sub- Selection projects CARMAC2-CP-CS-18-04 / Component 1: Consultant CW Design for 26 IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 107,377.40 Signed 2018-03-26 2018-03-23 2018-04-09 2018-05-14 2018-06-13 2018-06-13 2018-08-03 2018-06-16 2018-08-03 2018-12-28 communities Management System Selection CARMAC2-CP-CS-18-03 / Component 1: Consultant CW Supervision for 20 IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 29,718.47 Signed 2018-03-26 2018-03-26 2018-04-09 2018-05-14 2018-05-25 2018-06-13 2018-06-25 2018-06-25 2018-06-26 2019-09-28 communities Management System Selection Page 5 CARMAC2-CW-18-8/03 / Technical supervision of the quality of const. works of a veterinary service center in Consultant the Hrazdan city community Component 3: Strengthening IBRD / 83740 Post Qualification Open - National 3,583.95 Signed 2018-03-21 2018-04-03 2018-04-04 2018-05-03 2018-05-25 2018-05-15 2018-06-15 2018-05-25 2018-06-19 2018-10-09 of Kotayk marz and of the Public Sector Institutions Selection quality of refurbishment of membranous greenhouses of the Scientific Center of Veg. and Ind. Crops of the MoA RA Component 1: Consultant CARMAC2-CP-CS-18-05 / IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 0.00 Canceled 2018-08-08 2018-08-10 2018-08-22 2018-09-19 2018-09-24 2018-09-27 2018-12-26 Training for cooperatives Management System Selection CARMAC2-CP-CS-18-06 / Design and auth. supervision for the const. of watering Component 1: Consultant system in pastures of IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 32,447.07 Signed 2018-11-07 2020-01-21 2018-11-21 2018-12-26 2020-04-13 2019-01-25 2020-05-04 2019-01-28 2020-05-20 2020-01-23 2020-10-05 Ghazanchi, Mets Sepasar and Management System Selection Zuiqaghbyur settlements of Ashotsk community of Shirak marz CARMAC2-CS-19/31 / Independent Evaluator for the Consultant Component 2: Value Chain Value Chain Development IBRD / 83740 Post Qualification Open - National 11,941.36 Completed 2019-08-12 2019-08-14 2019-09-02 2019-10-16 2019-11-05 2019-11-15 2019-11-15 2019-12-20 2019-11-15 2020-06-17 2020-10-27 Development Component finished Selection subprojects CARMAC2-CS-19/34 / Evaluation of the sub-projects (business applications) Consultant Component 2: Value Chain presented within the IBRD / 83740 Post Qualification Open - National 9,024.44 Completed 2019-09-24 2019-09-24 2019-10-15 2019-11-28 2019-12-25 2019-12-28 2020-01-10 2020-02-01 2020-01-14 2020-07-30 2020-04-09 Development framework of Value Chain Selection Development component of the project CARMAC2-CP-CS-20-J-3/03 / CW technical supervision of Component 1: Consultant construction of watering IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 7,501.87 Signed 2020-03-20 2020-03-20 2020-04-03 2020-04-10 2020-04-30 2020-04-12 2020-06-03 2020-04-19 2020-06-03 2020-10-16 systems in the pastures of 9 Management System Selection communities (settlements) of RA CARMAC2-CP-CS-20-J-4/03 / Technical supervision of construction quality of Component 1: Consultant pasture water supply pipeline IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 11,966.58 Signed 2020-05-26 2020-06-01 2020-06-10 2020-06-26 2020-06-22 2020-07-07 2020-07-09 2020-07-14 2020-07-09 2021-06-29 systems in 10 Management System Selection communities/settlements of RA CARMAC2-CP-CS-20-J-5/03 / Technical supervision of the construction pasture water supply pipeline systems in Component 1: Consultant Bjni settlement of IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 1,788.41 Signed 2020-09-22 2020-09-22 2020-09-25 2020-09-29 2020-10-27 2020-10-05 2020-12-09 2020-10-11 2020-12-09 2021-05-08 Charentsavan community of Management System Selection Kotayk marz and Goris city settlement of Goris community of Syuniq CARMAC2-CP-CS-20-J-6/01 / Design and auth. supervision for the const. of Component 1: Consultant watering system in pastures IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 11,912.77 Signed 2020-12-15 2021-01-20 2020-12-29 2021-01-03 2021-02-16 2021-01-08 2021-03-23 2021-01-16 2021-03-23 2021-03-18 of 6 communities (or Management System Selection community’ settlements) of 3 marzes of RA CARMAC2-CP-CS-21/07 / Trainings of PUCs Component 1: Consultant members/chairmen's and Under IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 0.00 2021-01-21 2021-02-15 2021-02-11 2021-03-18 2021-03-25 2021-04-13 2021-10-10 community Implementation Management System Selection majors/administrative representatives. CARMAC2-CP-CS-21-J-7/01 / Design of construction of pasture water pipeline systems in Artabuynk and Shatin settlements of the Component 1: Consultant Yeghegis community and the IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 19,604.79 Signed 2021-02-03 2021-02-03 2021-02-17 2021-02-24 2021-03-22 2021-03-06 2021-04-07 2021-03-15 2021-04-16 2021-05-15 Zedeya settlement of Vayk Management System Selection community of the Vayots Dzor marz and Vardenis community of the Gegharkunik marz, and author supervis CARMAC2-CW-21-8/01 / Design of construction of VSC in Odzun community of Lori marz of RA and author’s Consultant Component 3: Strengthening supervision and design of IBRD / 83740 Post Qualification Open - National 5,763.51 Signed 2021-02-04 2021-02-12 2021-02-19 2021-03-08 2021-03-22 2021-03-13 2021-04-27 2021-03-15 2021-04-28 2021-05-15 Public Sector Institutions construction of animal Selection gathering places in the territory of 70 communities of RA Component 4: Project Consultant CARMAC2-CS-21-39 / Under IBRD / 83740 Coordination and Post Qualification Open - National 0.00 2021-02-10 2021-02-26 2021-02-25 2021-03-26 2021-03-29 2021-04-05 2022-04-20 Impact Assessment Implementation Management Selection CARMAC2-CP-CS-21-J-9/03 / Technical supervision of construction of pasture water Component 1: Consultant supply pipeline systems in IBRD / 83740 Community/Pasture Livestock Post Qualification Open - National 7,987.73 Signed 2021-02-25 2021-03-03 2021-03-07 2021-03-18 2021-03-31 2021-03-24 2021-04-13 2021-03-30 2021-05-06 2021-10-01 Ghazanchi, Mets Sepasar and Management System Selection Zuygaghbyur settlements of Ashotsk community of Shirak marz of RA Page 6 CARMAC2-CW-21-10/01 / Design-estimate documents for construction of a laboratory for providing Consultant veterinary and food safety Component 3: Strengthening Under IBRD / 83740 Post Qualification Open - National 0.00 2021-05-20 2021-06-09 2021-06-03 2021-06-20 2021-06-25 2021-06-27 2022-04-23 services in Torosgyugh Public Sector Institutions Implementation Selection village, Sarapat Community, Shirak Marz, RA as well as author’s supervision during construction INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Project CARMAC2-CS-17/18 / Social IBRD / 83740 Coordination and Post Direct Selection Direct 21,551.33 Signed 2017-12-27 2018-01-20 2018-01-29 2018-01-31 2019-12-31 specialist Management Component 4: Project CARMAC2-CS-17/17 / IBRD / 83740 Coordination and Post Direct Selection Direct 14,367.55 Signed 2017-12-25 2017-12-26 2018-01-29 2018-01-31 2019-12-31 Environmental specialist Management CARMAC2-CS-17/20 / Food Component 2: Value Chain IBRD / 83740 Post Direct Selection Direct 21,285.26 Terminated 2017-12-27 2017-12-28 2018-01-29 2018-01-31 2019-12-31 Safety specialist Development CARMAC2-CS-17/19 / Component 1: Community development IBRD / 83740 Community/Pasture Livestock Post Direct Selection Direct 21,496.49 Terminated 2017-12-27 2017-12-28 2018-01-30 2018-01-29 2018-01-31 2019-12-31 specialist Management System CARMAC2-CS-18/23 / Component 1: Individual Community Development IBRD / 83740 Community/Pasture Livestock Post Consultant Open 0.00 Canceled 2018-04-20 2018-04-10 2018-05-23 2018-06-06 2018-06-13 2018-12-10 Consultant (Assistant) for Management System Selection Gegharkunik Marz CARMAC2-CS-18/24 / Component 1: Individual Community Development IBRD / 83740 Community/Pasture Livestock Post Consultant Open 0.00 Canceled 2018-04-23 2018-05-14 2018-05-26 2018-06-09 2018-06-16 2020-02-06 Specialist Management System Selection CARMAC2-CS-18-27 / Individual Component 2: Value Chain "Value Chain Development" IBRD / 83740 Post Consultant Open 0.00 Canceled 2018-07-31 2018-08-09 2018-09-02 2018-09-16 2018-09-23 2019-09-18 Development (VCD) Component Consultant Selection CARMAC2-CS-18/26 / Consulting services of the Component 4: Project Management Information IBRD / 83740 Coordination and Post Direct Selection Direct 4,670.77 Signed 2018-08-06 2018-08-06 2018-08-06 2018-08-16 2018-12-06 2019-09-30 System (MIS) development, Management implementation and maintenance AM-MOA-114462-CS-INDV / Component 4: Project Individual Selection of CARMAC2 Project IBRD / 83740 Coordination and Post Consultant Limited 29,850.88 Terminated 2019-05-13 2019-05-22 2019-05-20 2019-05-24 2019-05-22 2019-05-30 2019-05-25 2019-05-30 2020-05-24 manager Management Selection CARMAC2-CS-18/25 / CONSULTANT EVALUATING Component 1: Individual THE DEGRADED AREAS OF 24 IBRD / 83740 Community/Pasture Livestock Post Consultant Open 0.00 Canceled 2018-04-20 2018-05-10 2018-05-23 2018-06-06 2018-06-13 2018-09-11 COMMUNITIES THAT HAVE Management System Selection BEEN REHABILITATED CARMAC2-CS-19/30 / THE EVALUATION OF THE NEARBY Component 1: Individual PASTURE AREAS IN TWENTY- IBRD / 83740 Community/Pasture Livestock Post Consultant Limited 3,993.27 Completed 2019-08-06 2019-06-27 2019-08-07 2019-07-11 2019-08-08 2019-07-11 2019-08-10 2019-07-11 2019-10-09 2019-09-12 FOUR COMMUNITIES THAT Management System Selection HAVE BEEN REHABILITATED UNDER CARMAC PROJECT CARMAC2-CS-19/32 / Component 4: Project Establishment of the financial IBRD / 83740 Coordination and Prior Direct Selection Direct 9,451.80 Completed 2019-09-06 2019-09-12 2019-09-16 2019-09-12 2019-11-20 2019-09-16 2020-05-18 2020-05-31 management system for the Management CARMAC2 Project CARMAC2-CS-19/33 / Food Individual Component 2: Value Chain Safety Consultant for VCD IBRD / 83740 Post Consultant Open 5,128.19 Signed 2019-09-06 2019-09-13 2019-10-25 2019-10-22 2019-11-15 2019-11-01 2019-12-20 2019-11-01 2020-06-17 Development component Selection Individual CARMAC2-CS-20/35 / VCD Component 2: Value Chain IBRD / 83740 Post Consultant Open 0.00 Canceled 2019-12-27 2019-12-26 2020-01-16 2020-01-17 2020-01-19 2020-05-30 COMPONENT ASSISTANT Development Selection CARMAC2-CS-20/36 / Component 4: Project Individual Selection of CARMAC2 Project IBRD / 83740 Coordination and Post Consultant Open 6,007.80 Signed 2020-02-06 2020-02-06 2020-02-26 2020-03-12 2020-02-27 2020-03-23 2020-03-01 2020-03-23 2020-05-31 manager Management Selection CARMAC2-CS-20/37 / Component 4: Project Project Financial Management IBRD / 83740 Coordination and Post Direct Selection Direct 35,803.24 Signed 2020-05-18 2020-05-25 2020-05-22 2020-05-25 2020-06-01 2020-06-01 2022-05-31 Consultant Management CARMAC2-CS-17/21 / Component 4: Project Individual Financial management IBRD / 83740 Coordination and Post Consultant Open 0.00 Canceled 2017-12-26 2018-01-18 2018-01-23 2018-01-25 2020-06-13 consultant Management Selection CARMAC2-CS-20/38 / Evaluation of the sub-projects (business applications) Component 2: Value Chain presented within the IBRD / 83740 Post Direct Selection Direct 7,711.12 Completed 2020-09-15 2020-09-18 2020-09-18 2020-09-26 2020-09-27 2020-10-01 2021-01-26 2020-11-11 Development framework of Value Chain Development component of the project Page 7 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) July 9, 2010 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other July 9, 2010 methods July 9, 2010 PROCUREMENT Kenya : Kenya Youth Employment and Opportunities PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2017-02-12 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151831 GPN Date: 2017-04-03 Project Name: Kenya Youth Employment and Opportunities Loan / Credit No: IDA / 58120 M Executing Agency(ies): inistry of Public Service, Youth and Gender Affairs WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MPYG-12189-GO-RFB / Strengthening youth policy Under Single Stage - One Procurement of Motor IDA / 58120 development and project Post Request for Bids Open - National 700,000.00 623,868.69 Implementati 2017-04-07 2017-09-15 2017-04-12 2017-05-24 2017-06-23 2017-07-28 2018-01-24 Envelope Vehicles. management on KE-MPYG-12022-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One Supply and delivery of interim IDA / 58120 development and project Post Limited 75,000.00 0.00 Implementati 2017-05-17 2017-07-12 2018-01-08 Quotations Envelope MIS equipment management on KE-MPYG-12182-GO-RFQ / Strengthening youth policy Pending Procurement of equipment for Request for Single Stage - One IDA / 58120 development and project Post Limited 5,300.00 0.00 Implementati 2017-04-30 2017-06-25 2017-12-22 PCU (Boardroom Chairs and Quotations Envelope management on Lockable Cabinets) KE-MPYG-14305-GO-RFQ / Strengthening youth policy Pending Procurement of ICT Single Stage - One IDA / 58120 development and project Post Request for Bids Open - National 150,000.00 0.00 Implementati 2017-08-07 2017-08-12 2017-09-23 2017-10-23 2017-11-27 2018-05-26 equipment for PCU and Envelope management on targeted Counties. KE-MPYG-53596-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One Procurement of 40 No tablets IDA / 58120 development and project Post Limited 16,000.00 0.00 Implementati 2018-05-02 2018-06-27 2018-12-24 Quotations Envelope for capturing data for Cycle 2 management on KE-MPYG-53606-GO-RFQ / Strengthening youth policy Pending Procurement of 20 No. Request for Single Stage - One IDA / 58120 development and project Post Limited 14,500.00 0.00 Implementati 2018-05-30 2018-07-25 2019-01-21 Laptops for Cycle two Quotations Envelope management on counties KE-MPYG-88634-GO-RFQ / Strengthening youth policy Pending Purchase of 40 No of tablets Request for Single Stage - One IDA / 58120 development and project Post Limited 31,500.00 0.00 Implementati 2019-01-23 2019-03-20 2019-09-16 for Cycle 3 Counties and 30 Quotations Envelope management on No for Cycle 4 Counties KE-MPYG-88635-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One Purchase of 10 No IDA / 58120 development and project Post Limited 5,400.00 0.00 Implementati 2019-01-30 2019-03-27 2019-09-23 Quotations Envelope tablets(Rugged) for PCU management on KE-MPYG-53579-GO-DIR / Strengthening youth policy Single Stage - One Procurement of 6 No.Motor IDA / 58120 development and project Post Request for Bids Open - National 420,000.00 0.00 Canceled 2018-04-13 2018-04-18 2018-05-30 2018-06-29 2018-08-03 2019-01-30 Envelope Vehicles for Cycle 2 counties. management Strengthening youth policy Under KE-MPYG-108685-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 2,400.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 4 No Glass Cabinets Quotations Envelope management on Strengthening youth policy Pending KE-MPYG-108687-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 300.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 1 No. Coffee Table Quotations Envelope management on Strengthening youth policy Pending KE-MPYG-108688-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 750.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 2 No. Secretarial desks Quotations Envelope management on Strengthening youth policy Pending KE-MPYG-108689-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 2,960.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 2 No. Workstation (4 way) Quotations Envelope management on KE-MPYG-108690-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One 1 No. Boardroom table 28 IDA / 58120 development and project Post Limited 5,600.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 Quotations Envelope seater management on Strengthening youth policy Pending KE-MPYG-108691-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 3,600.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 4 No. Workstation (2 way) Quotations Envelope management on Strengthening youth policy Pending KE-MPYG-108692-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 1,000.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 1 No. Reception desk Quotations Envelope management on KE-MPYG-108693-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One 3 No. High Back Orthopedic IDA / 58120 development and project Post Limited 1,050.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 Quotations Envelope Chairs management on Strengthening youth policy Pending KE-MPYG-108694-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 6,860.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 28 No. Office Chairs Quotations Envelope management on Strengthening youth policy Pending KE-MPYG-108695-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 370.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 2 No. Executive Visitors Chair Quotations Envelope management on Page 1 Strengthening youth policy Pending KE-MPYG-108696-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 720.00 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 4 No. Secretarial chairs Quotations Envelope management on KE-MPYG-108697-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One 3 Sets of Visitors Chairs (3 IDA / 58120 development and project Post Limited 630.00 0.00 Implementati 2019-04-20 2019-06-11 2019-12-08 Quotations Envelope Way) management on Strengthening youth policy Pending KE-MPYG-108699-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 475.00 0.00 Implementati 2019-04-21 2019-06-12 2019-12-09 5 No. Coat hangers Quotations Envelope management on Strengthening youth policy Pending KE-MPYG-108700-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 1,440.00 0.00 Implementati 2019-04-20 2019-06-11 2019-12-08 8 No. Visitors chair Quotations Envelope management on Strengthening youth policy Pending KE-MPYG-108701-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 5,040.00 0.00 Implementati 2019-04-22 2019-06-13 2019-12-10 28 No Boardroom chairs Quotations Envelope management on KE-MPYG-108702-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One 10 No. Filing metallic Cabinet IDA / 58120 development and project Post Limited 3,500.00 0.00 Implementati 2019-04-21 2019-06-12 2019-12-09 Quotations Envelope with four drawers management on KE-MPYG-108703-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One 5 No. Wooden In and Out tray IDA / 58120 development and project Post Limited 850.00 0.00 Implementati 2019-04-21 2019-06-12 2019-12-09 Quotations Envelope (4 shelves) with stand management on Strengthening youth policy Pending KE-MPYG-108704-GO-RFQ / Request for Single Stage - One IDA / 58120 development and project Post Limited 1,040.00 0.00 Implementati 2019-04-21 2019-06-12 2019-12-09 2 Sets of Filling Racks Quotations Envelope management on KE-MPYG-108705-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One 3 No. Water dispensers Hot IDA / 58120 development and project Post Limited 840.00 0.00 Implementati 2019-04-23 2019-06-14 2019-12-11 Quotations Envelope and Cold management on KE-MPYG-108706-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One Supply and fitting of Curtain IDA / 58120 development and project Post Limited 5,800.00 0.00 Implementati 2019-04-23 2019-06-14 2019-12-11 Quotations Envelope shears (all offices) - 100 Mtrs management on KE-MPYG-108707-GO-RFQ / Removal of old Locks and Strengthening youth policy Pending Request for Single Stage - One installation of new locks for IDA / 58120 development and project Post Limited 1,630.00 0.00 Implementati 2019-04-23 2019-06-14 2019-12-11 Quotations Envelope the main door, offices and management on stores - 10 No KE-MPYG-108708-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One Installation of 2 No. Grill IDA / 58120 development and project Post Limited 520.00 0.00 Implementati 2019-04-22 2019-06-13 2019-12-10 Quotations Envelope doors management on KE-MPYG-108680-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One Executive desk 2.0 m with IDA / 58120 development and project Post Limited 11,000.00 0.00 Implementati 2019-06-22 2019-08-17 2020-02-13 Quotations Envelope side units and drawers management on KE-MPYG-108681-GO-RFQ / Strengthening youth policy Pending Request for Single Stage - One 4 No. Executive desk 1.8 m IDA / 58120 development and project Post Limited 38,000.00 0.00 Implementati 2019-06-23 2019-08-18 2020-02-14 Quotations Envelope with side units and drawers management on KE-MPYG-135006-GO-RFQ / Procurement of 10 No all Strengthening youth policy Pending Request for Single Stage - One terrain tyres size 275/70/R16 IDA / 58120 development and project Post Limited 4,500.00 0.00 Implementati 2019-10-30 2019-12-25 2020-06-22 Quotations Envelope for vehicles attached to Kitui management on and Turkana Counties KE-MPYG-135010-GO-RFQ / Procurement of 30 No. of ordinary tyres size Strengthening youth policy Pending Request for Single Stage - One 255/70/R16 for vehicles IDA / 58120 development and project Post Limited 10,500.00 0.00 Implementati 2019-10-30 2019-12-25 2020-06-22 Quotations Envelope attached to management on Kiambu,Kisumu,Migori,Momb asa and Nakuru counties KE-MPYG-135011-GO-RFQ / Strengthening youth policy Pending Procurement of 15 No. of Request for Single Stage - One IDA / 58120 development and project Post Limited 6,750.00 0.00 Implementati 2019-11-05 2019-12-31 2020-06-28 tyres size 265/65/R17 for Quotations Envelope management on vehicles at the PCU Nairobi. KE-MPYG-135013-GO-RFQ / Strengthening youth policy Pending Procurement of 7No. of tyres Request for Single Stage - One IDA / 58120 development and project Post Limited 3,150.00 0.00 Implementati 2019-11-05 2019-12-31 2020-06-28 size 9.5/R17.5 for the KYEOP Quotations Envelope management on mini bus KE-MPYG-70217-GO-RFB / Strengthening youth policy Pending Procurement of 34 No of Single Stage - One IDA / 58120 development and project Post Request for Bids Open - National 1,350,000.00 0.00 Implementati 2018-08-31 2018-09-05 2018-10-17 2018-11-16 2018-12-21 2019-06-19 Motor Vehicles for KYEOP -for Envelope management on all cycles. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MPYG-12206-NC-RFQ / Strengthening youth policy Pending Request for Single Stage - One Printing of Promotional IDA / 58120 development and project Post Open - National 100,000.00 0.00 Implementati 2017-04-12 2017-06-07 2017-12-04 Quotations Envelope materials management on KE-MPYG-130596-NC-RFB / Strengthening youth policy Provision of insurance cover Single Stage - One IDA / 58120 development and project Post Request for Bids Limited 169,730.00 1.84 Signed 2019-09-27 2019-11-19 2019-10-02 2019-12-04 2019-11-13 2019-12-04 2019-12-13 2019-03-06 2020-01-17 2020-06-25 2020-07-15 for LST and CBST trainees - Envelope management All Cycles KE-MPYG-206745-NC-RFQ / Request for Single Stage - One Business Plan Competition IDA / 58120 Support for job creation Post Limited 35,000.00 0.00 Canceled 2020-12-08 2021-02-02 2021-08-01 Quotations Envelope Award Ceremony Page 2 Pending KE-MPYG-217131-NC-RFQ / Request for Single Stage - One IDA / 58120 Support for job creation Post Limited 60,000.00 0.00 Implementati 2021-02-02 2021-02-21 2021-03-14 BPC Award Ceremony Firm Quotations Envelope on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MPYG-6162-CS-QCBS / Consultancy Services for Strengthening youth policy Quality And Cost- development and design of a IDA / 58120 development and project Post Open - National 250,000.00 246,559.14 Signed 2017-02-09 2017-02-16 2017-03-02 2017-04-15 2018-02-01 2017-05-13 2017-06-12 2017-07-17 2018-05-16 2017-08-21 2018-03-30 2018-08-21 Based Selection Management Information management System (MIS) KE-MPYG-12239-CS-CQS / Strengthening youth policy Consultant Consultancy services for a Pending IDA / 58120 development and project Post Qualification Open - National 13,500.00 0.00 2017-04-07 2017-04-28 2017-06-11 2017-07-11 2017-08-15 2018-02-11 firm to carry out beneficiary Implementation management Selection assessment on catalytic funds KE-MPYG-12280-CS-CQS / Consultancy services for development of a Strengthening youth policy Consultant Pending communication strategy and IDA / 58120 development and project Post Qualification Open - National 98,000.00 0.00 2017-04-10 2017-05-01 2017-06-14 2017-07-14 2017-08-18 2018-02-14 Implementation management of major management Selection communication events under KYEOP KE-MPYG-6667-CS-QCBS / Consultancy Services for Strengthening youth policy provision of Core Business Quality And Cost- IDA / 58120 development and project Prior Open - National 1,400,000.00 0.00 Canceled 2017-02-09 2017-02-21 2017-03-02 2017-04-15 2017-05-13 2017-06-12 2017-07-17 2017-08-21 2018-08-21 Skills Training Providers for Based Selection management the Kenya Youth Employment and Opportunities Project. KE-MPYG-6658-CS-QCBS / Consultancy services for Strengthening youth policy Provision of Life Skills Quality And Cost- IDA / 58120 development and project Prior Open - National 1,400,000.00 0.00 Canceled 2017-02-09 2017-02-16 2017-03-02 2017-04-15 2017-05-13 2017-06-12 2017-07-17 2017-08-21 2018-08-21 Training under Kenya Youth Based Selection management Employment and Opportunities Project. KE-MPYG-14169-CS-QCBS / Strengthening youth policy Consultancy services for Quality And Cost- IDA / 58120 development and project Post Open - International 350,000.00 296,519.12 Signed 2017-05-05 2017-05-09 2017-05-26 2017-07-09 2017-05-09 2017-08-06 2017-09-05 2017-10-10 2017-11-14 2017-11-28 2018-11-14 development of core business Based Selection management skills training curriculum KE-MPYG-14170-CS-QCBS / Consultancy services for Strengthening youth policy Provision of Life Skills Quality And Cost- IDA / 58120 development and project Post Open - International 350,000.00 273,245.89 Signed 2017-05-05 2017-05-09 2017-05-26 2017-07-09 2017-05-09 2017-08-06 2017-09-05 2017-10-10 2017-11-14 2017-11-28 2018-11-14 Training under Kenya Youth Based Selection management Employment and Opportunities Project. KE-MPYG-52520-CS-FBS / Delivery of core business Strengthening youth policy skills training to youth Fixed Budget IDA / 58120 development and project Prior Open - International 6,500,000.00 6,398,006.40 Signed 2018-04-06 2018-04-27 2018-04-03 2018-06-10 2018-07-25 2018-07-08 2018-09-05 2018-08-07 2018-09-06 2018-09-11 2018-10-17 2018-10-16 2018-10-31 2019-10-16 selected to participate in the Selection management Kenya Youth Employment and Opportunities Project (KYEOP) KE-MPYG-52522-CS-FBS / Consultancy Services for Strengthening youth policy Fixed Budget Delivery of life skills training IDA / 58120 development and project Prior Open - International 6,500,000.00 6,332,196.00 Signed 2018-04-09 2018-04-30 2018-03-29 2018-06-13 2018-08-24 2018-07-11 2018-08-13 2018-08-10 2018-09-06 2018-09-14 2018-10-05 2018-10-19 2018-10-30 2019-10-19 Selection to youth selected to management participate in the KYEOP KE-MPYG-68522-CS-QCBS / Strengthening youth policy Monitoring of the Kenya Youth Quality And Cost- IDA / 58120 development and project Prior Open - International 700,000.00 165,341.02 Under Review 2018-08-10 2018-08-31 2018-10-23 2018-10-14 2019-02-04 2018-11-11 2018-12-11 2019-05-22 2019-01-15 2019-10-22 2019-02-19 2020-02-05 2020-02-19 Employment and Based Selection management Opportunities Project KE-MPYG-68861-CS-QCBS / Strengthening youth policy Procurement of a firm to Quality And Cost- IDA / 58120 development and project Prior Open - International 300,000.00 388,084.06 Signed 2018-08-17 2018-09-07 2018-10-26 2018-10-21 2019-02-25 2018-11-18 2018-12-18 2019-07-17 2019-01-22 2020-03-09 2019-02-26 2020-03-31 2020-02-26 manage the innovation Based Selection management challenge KE-MPYG-68524-CS-QCBS / Consultancy services of a firm Strengthening youth policy to conduct an extensive Quality And Cost- IDA / 58120 development and project Prior Open - International 400,000.00 184,631.16 Signed 2018-09-30 2018-10-21 2018-10-14 2018-12-04 2019-02-04 2019-01-01 2019-01-31 2019-05-06 2019-03-07 2019-06-19 2019-04-11 2019-07-19 2020-04-10 beneficiary tracer study of Based Selection management the KYEOP from March 2018 to 2021 KE-MPYG-68867-CS-QCBS / Impact Evaluation for Business Strengthening youth policy Quality And Cost- Plan Competition, Grants and IDA / 58120 development and project Prior Open - International 1,300,000.00 2,135,881.04 Under Review 2018-09-28 2018-10-19 2018-11-20 2018-12-02 2019-04-10 2018-12-30 2019-01-29 2019-06-03 2019-03-05 2019-10-01 2019-04-09 2019-11-05 2020-04-08 Based Selection Business Development management Services. KE-MPYG-118557-CS-QCBS Strengthening youth policy / In-Depth Financial Quality And Cost- IDA / 58120 development and project Post Open - National 120,000.00 110,573.66 Signed 2019-07-01 2020-03-30 2019-07-22 2019-09-04 2020-05-28 2019-10-02 2020-06-30 2019-11-01 2020-07-07 2019-12-06 2020-01-10 2020-09-23 2021-01-09 Management and Based Selection management Management Information Systems Review KE-MPYG-149648-CS-CQS / Consultancy Services for Digital Training on Strengthening youth policy Consultant Government Catalytic Funds IDA / 58120 development and project Post Qualification Open - National 200,000.00 0.00 Canceled 2019-12-27 2020-01-17 2020-01-17 2020-03-01 2020-03-31 2020-05-05 2020-11-01 and Access to Government management Selection Procurement Opportunities (AGPO) to youth KE-MPYG-164235-CS-QCBS / Consultancy Services for Digital Training on Improving youth Quality And Cost- Government Catalytic Funds IDA / 58120 Post Open - National 250,000.00 189,973.63 Signed 2020-03-13 2020-03-18 2020-03-27 2020-05-10 2020-05-14 2020-06-07 2020-06-16 2020-07-07 2020-06-23 2020-08-11 2020-06-26 2020-09-15 2020-07-10 2021-09-15 employability Based Selection and Access to Government Procurement Opportunities (AGPO) to youth Page 3 KE-MPYG-88626-CS-QCBS / Consultancy Services for Digital Delivery of Strengthening youth policy Quality And Cost- Government Catalytic Funds IDA / 58120 development and project Post Open - National 350,000.00 0.00 Canceled 2019-01-24 2019-04-04 2019-02-14 2019-03-30 2019-04-27 2019-05-27 2019-07-01 2019-08-05 2020-08-04 Based Selection and Access to Government management Procurement Opportunities (AGPO) to youth. KE-MPYG-239154-CS-CQS / Consultant Provision of Online Internship Improving labor market Under IDA / 58120 Post Qualification Open - National 250,000.00 0.00 2021-06-10 2021-06-14 2021-07-01 2021-08-14 2021-09-13 2021-10-18 2022-04-16 and Employment Placement information Implementation Selection Services For KYEOP Trainees INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MPYG-12269-CS-INDV / Strengthening youth policy Individual Individual Consultancy Pending IDA / 58120 development and project Post Consultant Limited 15,000.00 0.00 2017-04-07 2017-04-12 2017-05-03 2017-06-07 2017-12-04 services for review of the Implementation management Selection National Youth Policy KE-MPYG-12230-CS-CQS / Strengthening youth policy Individual Pending Individual Consultancy IDA / 58120 development and project Post Consultant Open 25,000.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 Implementation services for Life Skills Training management Selection KE-MPYG-12237-CS-CQS / Strengthening youth policy Individual Consultancy services for an Pending IDA / 58120 development and project Post Consultant Open 25,000.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 individual consultant for Core Implementation management Selection Business Skills training KE-MPYG-6641-CS-INDV / Consultancy services for Strengthening youth policy Individual preparation of IDA / 58120 development and project Post Consultant Open 98,000.00 0.00 Canceled 2017-02-09 2017-03-30 2017-04-20 2017-05-25 2017-11-21 Communication Strategy and management Selection implementation of major KYEOP events. KE-MPYG-14304-CS-INDV / Strengthening youth policy Individual Individual Consultancy for Under IDA / 58120 development and project Post Consultant Limited 35,000.00 63,999.98 2017-05-15 2017-05-20 2017-06-10 2017-07-15 2017-07-28 2018-01-11 development of KYEOP interim Implementation management Selection MIS KE-MPYG-12034-CS-CQS / Strengthening youth policy Individual Consultancy services for a Pending IDA / 58120 development and project Post Consultant Open 72,000.00 0.00 2017-05-18 2017-07-06 2017-07-27 2017-08-31 2018-02-27 Monitoring and Evaluation Implementation management Selection officer. KE-MPYG-12033-CS-CQS / Consultancy services for a Strengthening youth policy Individual Procurement Specialist to IDA / 58120 development and project Prior Consultant Open 43,269.00 78,739.90 Signed 2017-05-18 2017-07-06 2017-07-27 2017-08-07 2017-08-31 2017-08-01 2018-02-27 support the implementing management Selection agencies KE-MPYG-51146-CS-INDV / Design of an innovation challenge for organizations Strengthening youth policy Individual Pending dealing with the hard-to- IDA / 58120 development and project Post Consultant Open 60,000.00 0.00 2018-02-26 2018-04-16 2018-05-07 2018-06-11 2018-12-08 Implementation serve Youth and Terms of management Selection Reference for firm that will implement the challenge KE-MPYG-77912-CS-CDS / Individual Consultant - Strengthening youth policy Procurement support for IDA / 58120 development and project Prior Direct Selection Direct 60,000.00 106,850.63 Signed 2018-09-28 2018-10-23 2018-10-08 2018-12-12 2019-05-17 2019-06-10 KYEOP Implementing management Agencies, KE-MPYG-77911-CS-CDS / Strengthening youth policy Individual Consultancy - IDA / 58120 development and project Prior Direct Selection Direct 72,000.00 129,775.49 Signed 2018-09-27 2018-10-23 2018-10-07 2018-12-11 2019-05-17 2019-06-09 Monitoring and Evaluation management Specialist for KYEOP KE-MPYG-52585-CS-INDV / Strengthening youth policy Individual Consultancy Services for Roll IDA / 58120 development and project Prior Consultant Direct 36,000.00 62,314.56 Signed 2018-04-20 2018-12-14 2018-04-30 2018-05-21 2019-04-15 2018-06-25 2019-05-17 2018-12-22 out and Capacity support management Selection Technical Assistant for KYEOP KE-MPYG-104837-CS-CDS / Development of Interim MIS system - the consultant will develop and embed new modules into the interim Strengthening youth policy management information IDA / 58120 development and project Prior Direct Selection Direct 160,000.00 158,259.20 Signed 2019-03-29 2019-04-08 2019-06-12 2019-05-17 2019-12-09 system to meet the expanding management needs of the project and also offer continued technical assistance to the implementing agencies. KE-MPYG-118556-CS-CDS / Strengthening youth policy Communication Consultant on IDA / 58120 development and project Prior Direct Selection Direct 20,000.00 18,441.68 Signed 2019-09-19 2019-12-04 2019-09-29 2019-11-18 2019-12-03 2020-02-10 2020-05-31 short term basis (4 months) management KE-MPYG-123194-CS-INDV / Engagement of Individual Strengthening youth policy Individual Under Consultant for IDA / 58120 development and project Post Consultant Open - National 72,000.00 0.00 2019-10-02 2020-11-26 2019-11-20 2020-12-22 2019-12-11 2021-02-18 2020-01-15 2020-07-13 Implementation Communication for KYEOP for management Selection a period of one year. KE-MPYG-159134-CS-INDV Individual / MIS Assistant Developer and Improving youth Under IDA / 58120 Post Consultant Limited 65,000.00 0.00 2020-02-17 2020-03-10 2020-02-22 2020-09-24 2020-03-14 2021-01-19 2020-04-18 2021-04-18 Infrastructure Support employability Implementation Selection Consultant KE-MPYG-181809-CS-CDS / Improving youth Under KYEOP Tracer Studies for IDA / 58120 Prior Direct Selection Direct 200,000.00 0.00 2020-09-11 2020-12-11 2020-09-16 2020-12-11 2020-11-20 2021-11-20 employability Implementation Cycle 2 and 3 Page 4 KE-MPYG-88615-CS-INDV- REV / Individual Consultant for a Filed Supervisor to help supervise data collection and Individual Pending implementation of IDA / 58120 Support for job creation Post Consultant Open 60,000.00 0.00 2019-02-25 2019-07-09 2019-07-23 2019-08-27 2020-08-26 Implementation interventions for the Impact Selection Evaluations of Business Development Services and Business Plan Competition KE-MPYG-88615-CS-INDV / Individual Consultant Services(3 years contract) for a Field Supervisor to help Strengthening youth policy Individual supervise the data collection IDA / 58120 development and project Prior Consultant Open 210,000.00 0.00 Canceled 2019-01-25 2019-02-25 2019-03-15 2019-07-03 2019-04-05 2019-05-10 2019-11-06 and implementation of management Selection interventions for the impact evaluations of the Business Development Services and Business Plan Competition. KE-MPYG-123390-CS-INDV / Individual Consultant Services (one year, renewable) for a Field Supervisor to help Individual supervise the data collection Improving youth IDA / 58120 Post Consultant Open 150,000.00 0.00 Canceled 2019-07-18 2019-01-10 2019-09-05 2019-09-26 2019-10-31 2020-04-28 and implementation of employability Selection interventions for the impact evaluations of the Business Development Services and Business Plan Competition. KE-MPYG-200072-CS-INDV Individual Improving youth / Selection of 2000 Individual IDA / 58120 Prior Consultant Limited 1,500,000.00 0.00 Under Review 2020-12-04 2020-12-15 2020-12-09 2021-02-02 2020-12-16 2021-01-06 2022-01-06 employability Master Craftsmen as IC Selection KE-MPYG-206748-CS-CDS / Strengthening youth policy Under Impact Evaluation Field IDA / 58120 development and project Post Direct Selection Direct 78,000.00 0.00 2020-12-11 2020-11-12 2020-12-21 2021-02-24 2021-08-23 Implementation Coordinator management KE-MPYG-173269-CS-CDS / PRIVATE SECTOR Improving youth IDA / 58120 Prior Direct Selection Direct 2,800,000.00 0.00 Canceled 2020-05-12 2020-06-11 2020-05-22 2020-07-26 2021-07-26 ORGANIZATION FOR employability PLACEMENT OF YOUTH KE-MPYG-230272-CS-INDV Strengthening youth policy Individual Under / Engagement of Impact IDA / 58120 development and project Post Consultant Limited 78,000.00 0.00 2021-04-30 2021-06-15 2021-05-05 2021-05-26 2021-06-30 2021-12-27 Implementation Evaluation Field Coordinator management Selection Page 5 Procurement Plan Urban Development Project July 9, 2010 PROCUREMENT Kyrgyz Republic : Urban Development Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2017-02-23 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151416 GPN Date: Project Name: Urban Development Project Loan / Credit No: TF / 19293, IDA / 57620, IDA / D1010, TF / A1993 Community Development and Investment Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IDA-UDP-CW-2017-3 / Component A: Urban Single Stage - One 2018-02- Improvement of street IDA / 57620 Post Request for Bids Open - National 150,000.00 144,840.63 Signed 2017-05-21 2017-05-19 2017-05-26 2017-07-07 2017-06-19 2017-07-27 2017-07-14 2017-08-31 2017-09-04 Development Envelope 27 lightning in Toktogul/ IDA-UDP-CW-17-1 / "Rehabilitation of water supply Component A: Urban Single Stage - One 3,321,894.4 2018-08- IDA / 57620 Post Request for Bids Open - National 3,800,000.00 Signed 2017-10-17 2017-10-20 2017-10-22 2017-12-03 2017-11-21 2018-01-02 2018-03-27 2018-02-06 2018-04-20 system in Kerben city, Djalal- Development Envelope 5 05 Abad oblast" (2 lots). IDA-UDP-CW-2017-4 / Component A: Urban Request for Single Stage - One 2019-01- Improvement of street IDA / 57620 Post Open - National 190,000.00 0.00 Canceled 2018-02-06 2018-02-11 2018-03-24 2018-04-23 2018-05-28 Development Proposals Envelope 10 lightning in Balykchy IDA-UDP-CW-2018-5 / Construction works of Component A: Urban Single Stage - One 2019-02- IDA / 57620 Post Request for Bids Open - National 959,126.00 849,451.05 Signed 2018-04-29 2018-05-04 2018-05-04 2018-06-15 2018-06-25 2018-07-15 2018-09-11 2018-08-19 2018-10-19 Aytmatov school, Balykchy Development Envelope 15 city. IDA-UDP-CW-2018-6 / Component A: Urban Single Stage - One 2019-02- Construction works of IDA / 57620 Post Request for Bids Open - National 856,014.00 884,766.49 Signed 2018-04-29 2018-05-04 2018-05-04 2018-06-15 2018-06-25 2018-07-15 2018-09-04 2018-08-19 2018-10-19 Development Envelope 15 Toktogul school, Toktogul city IDA-UDP-CW-2018-2 / Rehabilitation of water supply Component A: Urban Single Stage - One 3,194,335.0 2019-11- IDA / 57620 Post Request for Bids Open - National 4,250,000.00 Signed 2018-04-25 2018-05-16 2018-05-04 2018-06-15 2018-06-11 2018-07-15 2018-07-12 2018-08-19 2018-09-01 system in Sulyukta city Batken Development Envelope 4 30 oblast (5 Lots) IDA-UDP-CW-2018-7 / Construction works of Jakypov Component A: Urban Single Stage - One 2019-05- school and Ak-Tilek TF / A1993 Post Request for Bids Open - National 823,834.00 740,789.72 Signed 2018-08-10 2018-07-27 2018-08-15 2018-09-26 2018-09-04 2018-10-26 2018-10-26 2018-11-30 2018-12-21 Development Envelope 29 kindergarten, Balykchy city (2 Lots) IDA-UDP-CW-2018-8 / Construction works of Component A: Urban Single Stage - One 1,154,757.6 2019-05- Bokonbaev school and Archa- TF / A1993 Post Request for Bids Open - National 1,314,328.00 Signed 2018-08-10 2018-07-27 2018-08-15 2018-09-26 2018-09-04 2018-10-26 2018-10-19 2018-11-30 2018-12-21 Development Envelope 5 29 Beshik kindergarten, Toktogul city (2 Lots) IDA-UDP-CW-2021-1 / Component A: Urban 2021-08- Rehabilitation of water supply IDA / 57620 Prior Direct Selection Direct 329,000.00 0.00 Canceled 2020-12-28 2021-01-02 2021-02-06 Development 05 system in Sulyukta (Phase 2) IDA-UDP-CW-2021-2 / Component A: Urban 2021-08- Rehabilitation of water supply IDA / 57620 Prior Direct Selection Direct 255,495.00 0.00 Canceled 2020-12-28 2021-01-02 2021-02-06 Development 05 system in Sulyukta (Phase 2) IDA-UDP-CW-2021-1/1 / Component A: Urban 2021-08- Additional extension of the IDA / 57620 Post Direct Selection Direct 329,000.00 313,940.62 Signed 2021-01-13 2021-01-13 2021-01-18 2021-01-13 2021-02-22 2021-02-15 Development 21 Sulukta water supply network IDA-UDP-CW-2021-2/2 / Component A: Urban 2021-08- Additional extension of the IDA / 57620 Post Direct Selection Direct 255,495.00 243,797.14 Signed 2021-01-13 2021-01-13 2021-01-18 2021-01-13 2021-02-22 2021-02-15 Development 21 Sulukta water supply network IDA-UDP-SHOPPING-WORKS- Pending 2021-1 / Repair of fencing of Component A: Urban Request for Single Stage - One Other (with field 2021-08- IDA / 57620 Post Open - National 20,000.00 0.00 Implementat 2021-07-09 2021-07-22 Ak-Tilek kindergarten Development Quotations Envelope for explanation) 31 ion territory GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ARIS-UDP-G-18-1 / Purchase of special machinery (back loading waste Component A: Urban Single Stage - One TF / A1993 Post Request for Bids Open - National 150,000.00 131,057.90 Completed 2018-08-10 2018-08-10 2018-08-17 2018-09-28 2018-09-07 2018-10-28 2018-12-02 2018-10-23 2019-05-31 2019-01-31 machinery) for Toktogul, Development Envelope Kerben, Balykchy and Sulyukta towns IDA-UDP-G-2020-1 / Purchase of computer Component A: Urban Request for Single Stage - One IDA / D1010 Post Open - National 5,500.00 0.00 Canceled 2020-12-19 2020-12-16 2021-02-13 2021-08-12 equipment for billing systems Development Quotations Envelope for municipalities ( Sulukta) IDA-UDP-G-2020-2 / Purchase of furniture Component A: Urban Request for Single Stage - One equipment for input of billing IDA / D1010 Post Open - National 1,500.00 0.00 Canceled 2020-12-19 2020-12-16 2021-02-13 2021-08-12 Development Quotations Envelope systems for municipalities (Sulyukta) IDA-UDP-NCB-GOODS-2020- Under 6 / Purchase of special Component A: Urban Single Stage - One IDA / D1010 Post Request for Bids Open - National 250,000.00 0.00 Implementati 2020-12-14 2020-12-18 2020-12-19 2020-12-21 2021-01-30 2021-01-15 2021-03-01 2021-04-05 2021-10-02 equipment for cities Sulukta, Development Envelope on Kerben, Balykchy,Toktogul Page 1 IDA-UDP-NCB-GOODS-2020- Under 4 / Purchase of furniture for Component A: Urban Single Stage - One IDA / D1010 Post Request for Bids Open - National 210,000.00 208,075.19 Implementati 2020-12-14 2020-12-18 2020-12-19 2020-12-21 2021-01-30 2021-01-22 2021-03-01 2021-02-15 2021-04-05 2021-10-02 schools and kindergarten in Development Envelope on the city Balykchy,Toktogul IDA-UDP-GOODS-2020-5 / Purchase of equipment and Component A: Urban Request for Single Stage - One inventory for schools and IDA / D1010 Post Open - National 20,000.00 23,130.89 Signed 2020-12-19 2020-12-16 2021-02-13 2021-02-15 2021-08-12 Development Quotations Envelope kindergartens in the city Toktogul, Balykchy IDA-UDP-G-2020-1-RT1 / Pending Purchase of computer Component A: Urban Request for Single Stage - One IDA / 57620 Post Open - National 5,500.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 equipment for billing systems Development Quotations Envelope on for municipalities ( Sulukta) IDA-UDP-G-2020-2-RT1 / Purchase of furniture Pending Component A: Urban Request for Single Stage - One equipment for input of billing IDA / 57620 Post Open - National 1,500.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Development Quotations Envelope systems for municipalities on (Sulyukta) IDA-UDP-NCB-GOODS-2021- 1 / Purchase of special Under Component A: Urban Single Stage - One equipment for cities Sulukta, IDA / 57620 Post Request for Bids Open - National 356,000.00 0.00 Implementati 2021-03-26 2021-03-26 2021-03-31 2021-03-26 2021-05-12 2021-06-11 2021-07-16 2022-01-12 Development Envelope Kerben, Balykchy,Toktogul on (#Lot4) IDA-UDP-G-2021-1 / Under Purchase of labarator Component A: Urban Request for Single Stage - One IDA / 57620 Post Open - National 7,000.00 0.00 Implementati 2021-03-29 2021-03-26 2021-05-24 2021-11-20 equipment for Sulyukta and Development Quotations Envelope on Kerben towns IDA-UDP-G-2021-2 / Purchase of safety signs for Under Component A: Urban Request for Single Stage - One schools and kindergartens in IDA / 57620 Post Open - National 2,500.00 0.00 Implementati 2021-05-25 2021-06-02 2021-07-20 2022-01-16 Development Quotations Envelope the cities of Balykchy and on Toktogul Pending IDA-UDP-GOODS-2021-2 / Component A: Urban Request for Single Stage - One IDA / 57620 Post Open - National 10,000.00 0.00 Implementati 2021-07-09 2021-07-22 2021-08-21 Supply of furniture for schools Development Quotations Envelope on IDA-UDP-GOODS-2021-3 / Pending Supply of office equipment Component A: Urban Request for Single Stage - One IDA / 57620 Post Open - National 90,000.00 0.00 Implementati 2021-07-09 2021-07-24 2021-08-23 and other for schools and Development Quotations Envelope on kindergartens NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UDP PPG-FBS-2015-3 / Preparation of Feasibility Component A: Urban Fixed Budget Studies and Detailed Designs TF / 19293 Prior Open - International 0.00 346,000.00 Signed 2015-12-22 2016-01-02 Development Selection of water supply systems in Sulukta and Kerben UDP PPG-QCBS-2016-4 / Preparation of Feasibility Studies and Designs for Improved Seismic Safety and Component A: Urban Quality And Cost- IDA / 57620 Prior Open - International 0.00 647,522.22 Signed 2016-11-10 2016-11-15 Energy Efficiency of Schools Development Based Selection and Kindergartens and Technical Supervision of construction. ARIS-AUDIT-LCS-2017-1 / Component C: Least Cost IDA / 57620 Post Open - International 60,000.00 71,433.00 Signed 2017-10-17 2017-10-09 2017-11-07 2018-03-12 2017-12-21 2018-03-28 2018-01-18 2018-04-18 2018-02-17 2018-04-18 2018-03-24 2018-04-23 2018-04-28 2018-04-26 2018-10-25 Audit of project funds Implementation Support Selection IDA-UDP-CS-CQS-2018-1 / Consultant Component A: Urban Contract supervision for IDA / 57620 Post Qualification Open - National 150,000.00 168,921.90 Signed 2018-10-03 2018-10-31 2018-10-24 2018-11-02 2018-12-07 2018-12-03 2019-01-06 2018-12-14 2019-02-10 2018-12-14 2019-08-09 Development schools local company Selection IDA-UDP-CQS-2018-2 / Consultants services to carry out hydrogeological studies of Consultant Component A: Urban springs pinching out on the IDA / 57620 Post Qualification Open - National 20,000.00 0.00 Canceled 2019-03-05 2019-03-14 2019-03-26 2019-03-19 2019-05-09 2019-06-08 2019-07-13 2020-01-09 Development left bank of the Padysha-Ata Selection river in Kerben town, Jalal- Abad oblast Consultant IDA-UDP-CQ-2019-3 / Component A: Urban IDA / 57620 Post Qualification Open - National 35,000.00 0.00 Canceled 2020-01-30 2020-02-20 2020-04-04 2020-05-04 2020-06-08 2020-12-05 Impact Assesment Development Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UDP-ECAPDEV-CS-2015-1 / Consultancy Services for the Results Assessment of the Component A: Urban Urban Development Project TF / 19293 Prior Direct Selection Direct 0.00 43,758.68 Signed 2015-07-01 Development (UDP) and Bishkek and Osh Urban Infrastructure Project (BOUIP) Page 2 IDA-UDP-CS-IC-17-1 / Component A: Urban Consulatnt for development of IDA / 57620 Post Direct Selection Direct 3,000.00 3,936.30 Completed 2017-05-14 2018-05-18 2017-05-24 2017-05-12 2017-07-28 2017-05-15 2018-01-24 2017-08-31 Development streetlightning design Individual IDA-UDP-CS-IC-2017-2 / Component A: Urban IDA / D1010 Post Consultant Open 18,530.00 5,947.69 Signed 2017-05-28 2018-05-17 2017-07-16 2018-04-10 2017-08-06 2018-04-10 2017-09-10 2018-04-23 2018-03-09 Resident engineer in Kerben Development Selection Individual IDA-UDP-CS-IC-2017-3 / Component A: Urban IDA / 57620 Post Consultant Open 18,530.00 3,018.73 Signed 2017-05-28 2018-05-17 2017-07-16 2018-09-05 2017-08-06 2018-09-05 2017-09-10 2018-09-13 2018-03-09 Resident engineer in Sulyukta Development Selection IDA-UDP-CS-IC-2017-4 / Individual Component A: Urban Assistant resident engineer in IDA / D1010 Post Consultant Open 8,824.00 4,758.15 Signed 2017-05-28 2018-05-18 2017-07-16 2018-04-10 2017-08-06 2018-04-10 2017-09-10 2018-04-23 2018-03-09 Development Kerben Selection IDA-UDP-CS-IC-2017-5 / Individual Component A: Urban Assistant resident engineers IDA / D1010 Post Consultant Open 8,824.00 2,082.41 Signed 2017-05-28 2018-05-18 2017-07-16 2018-09-05 2017-08-06 2018-09-05 2017-09-10 2018-09-13 2018-03-09 Development in Sulyukta Selection Individual IDA-UDP-IC-2018-2 / Social Component B: Institutional IDA / 57620 Post Consultant Open 11,118.00 5,146.54 Signed 2018-06-29 2018-06-01 2018-11-18 2018-04-10 2018-12-09 2018-04-10 2019-01-13 2018-04-16 2019-07-12 mobilizers Strengthening Selection Individual IDA-UDP-IC-2018-3 / Social Component B: Institutional IDA / 57620 Post Consultant Open 11,118.00 2,185.97 Signed 2018-07-01 2018-05-16 2018-08-19 2018-09-05 2018-09-09 2018-09-12 2018-10-14 2018-09-13 2019-04-12 mobilizers Strengthening Selection IDA-UDP-IC-2018-11 / Individual Component C: Strengthening of technical IDA / 57620 Post Consultant Open 100,000.00 104,946.40 Terminated 2018-02-06 2018-01-17 2018-03-27 2018-04-18 2018-04-17 2018-04-16 2018-05-22 2018-04-30 2018-11-18 Implementation Support supervision Selection IDA-UDP-SSS-17-4 / Component A: Urban Consulatnt for author IDA / 57620 Post Direct Selection Direct 1,500.00 1,371.78 Completed 2017-09-06 2017-09-07 2017-09-27 2017-09-21 2017-09-28 2017-09-28 2018-03-30 2018-03-03 Development supervision Toktogul IDA-UDP-SSS-18-1 / Component A: Urban Consulatnt for author IDA / 57620 Post Direct Selection Direct 1,500.00 1,371.78 Completed 2017-09-06 2018-05-18 2017-09-26 2018-04-02 2018-02-28 2018-04-02 2018-09-30 2018-09-30 Development supervision Balykchy IDA-UDP-IC-18-18 / Individual Consultant on improving the Component B: Institutional IDA / 57620 Post Consultant Open 40,000.00 48,310.29 Terminated 2018-04-04 2018-06-01 2018-06-29 2018-07-09 2018-07-20 2018-07-20 2018-08-24 2018-08-01 2019-02-20 activity of the water utilities of Strengthening Selection Kerben, Sulukta IDA-UDP-IC-18-17 / Local Individual consultant on improving the Component B: Institutional IDA / 57620 Post Consultant Open 11,600.00 6,955.62 Completed 2018-04-04 2018-06-01 2018-05-23 2018-08-10 2018-06-13 2018-08-27 2018-07-18 2018-09-04 2019-01-14 2019-11-30 activity of the water utilities of Strengthening Selection Kerben, Sulukta IDA-UDP-IC-2017-1 / Individual Contract supervision for Component B: Institutional IDA / 57620 Post Consultant Open 6,500.00 1,575.93 Completed 2017-06-15 2017-10-01 2017-08-26 2017-10-10 2017-09-16 2017-10-10 2017-11-01 2017-11-01 2018-03-31 2018-03-30 lightning/Electrical engineer Strengthening Selection in Toktogul city IDA-UDP-IC-2018-17 / Individual Consultant for author Component A: Urban TF / A1993 Post Consultant Limited 7,500.00 12,987.62 Signed 2018-05-31 2018-05-24 2018-06-05 2018-06-20 2018-06-26 2018-06-20 2018-07-31 2018-06-20 2019-10-31 supervision in Kerben city Development Selection Djalal-Abad oblast IDA-UDP-IC-2018-18 / Individual Consultant for author Component A: Urban TF / A1993 Post Consultant Limited 7,500.00 12,627.73 Signed 2018-05-31 2018-05-24 2018-06-05 2018-06-20 2018-06-26 2018-06-20 2018-08-01 2018-06-20 2020-01-31 supervision in Sulyukta city Development Selection Batken oblast IDA-UDP-IC-2018-1 / Individual Contract supervision for Component B: Institutional IDA / 57620 Post Consultant Open 6,500.00 6,911.70 Completed 2018-05-18 2018-03-01 2018-07-06 2018-03-30 2018-07-27 2018-03-30 2018-08-31 2018-04-02 2019-02-27 2018-12-31 lightning/Electrical engineer Strengthening Selection in Balykchy city IDA-UDP-IC-2018-25 / Individual Component A: Urban International consultant for IDA / 57620 Post Consultant Open 50,000.00 21,035.00 Signed 2018-10-03 2018-10-30 2018-11-21 2018-11-16 2018-12-12 2018-12-24 2019-01-16 2018-12-28 2019-07-15 Development seismic Selection IDA-UDP-IC-2018-26 / Individual Component A: Urban international consultant on IDA / 57620 Post Consultant Open 50,000.00 32,571.00 Signed 2018-10-03 2018-10-30 2018-11-21 2018-11-16 2018-12-12 2018-12-27 2019-01-16 2018-12-28 2019-07-15 Development energy efficiency Selection IDA-UDP-CS-DS-2018-1 / Component A: Urban Local consulatnt for author IDA / 57620 Post Direct Selection Direct 61,500.00 87,093.37 Signed 2018-10-03 2018-12-06 2018-10-13 2018-10-25 2018-12-17 2018-12-17 2019-06-15 Development supervision for school IDA-UDP-IC-2018-21 / Individual Component B: Institutional Consultant on legal zoning IDA / 57620 Post Consultant Open 10,230.00 0.00 Canceled 2018-10-05 2018-11-29 2018-11-23 2018-12-14 2019-01-18 2019-07-17 Strengthening and land use. (Consultant#3) Selection IDA-UDP-IC-2018-22 / Consultant on planning socio- economic development, local Individual Component B: Institutional governance and citizen IDA / 57620 Post Consultant Open 15,750.00 0.00 Canceled 2018-10-05 2018-12-19 2018-11-23 2018-12-14 2019-01-18 2019-07-17 Strengthening participation in the decision- Selection making process (Consultant#1 Team Leader) IDA-UDP-IC-2018-23 / Individual Component B: Institutional Consultant on spatial IDA / 57620 Post Consultant Open 15,000.00 0.00 Canceled 2018-10-05 2018-11-29 2018-11-23 2018-12-14 2019-01-18 2019-07-17 Strengthening planning. (Consultant #2) Selection IDA-UDP-IC-2018-28 / Local Individual Component A: Urban consultant to adapt the IDA / 57620 Post Consultant Open 8,000.00 3,582.18 Completed 2018-11-30 2018-12-04 2019-01-18 2019-02-11 2019-02-08 2019-02-11 2019-03-15 2019-02-12 2019-09-11 2020-07-31 Development Manual Selection IDA-UDP-IC-2018-29 / Individual International consultant on Component A: Urban IDA / 57620 Post Consultant Open 60,000.00 26,468.00 Signed 2018-12-07 2018-12-10 2019-01-25 2019-01-30 2019-02-15 2019-02-11 2019-03-22 2019-02-12 2020-03-21 Strengthening of techncial Development Selection supervision Page 3 IDA-UDP-CS-DS-2018-2 / International consultant - advisor on construction Component A: Urban IDA / 57620 Post Direct Selection Direct 15,000.00 0.00 Canceled 2018-10-05 2018-10-15 2018-12-19 2019-06-17 technical supervision of water Development supply projects in Kerben and Sulyukta towns IDA-UDP-IC-2018-31 / Individual Technical support consultant Component B: Institutional IDA / 57620 Post Consultant Open 15,000.00 24,550.00 Signed 2018-12-25 2018-12-19 2019-02-12 2019-02-07 2019-03-05 2019-02-11 2019-04-09 2019-02-12 2019-10-06 of the UDP on water supply Strengthening Selection projects IDA-UDP-IC-2018-32 / Individual Consultant on improving the Component A: Urban IDA / 57620 Post Consultant Open 50,000.00 36,457.00 Completed 2018-12-20 2018-12-19 2019-02-07 2018-12-04 2019-02-28 2018-12-27 2019-04-04 2018-12-28 2019-10-01 2019-11-30 activity of the water utilities of Development Selection Kerben, Sulukta IDA-UDP-IC-2018-27 / Individual Component A: Urban Consultant on legal issues IDA / 57620 Post Consultant Open 7,500.00 0.00 Canceled 2018-11-12 2018-11-29 2018-12-31 2019-01-21 2019-02-25 2019-08-24 Development (Consultant#4) Selection Individual IDA-UDP-IC-2018-33 / Component A: Urban IDA / 57620 Post Consultant Open 13,500.00 0.00 Canceled 2018-12-20 2018-12-27 2019-02-07 2019-02-28 2019-04-04 2019-10-01 lawyer (Consultant#4) Development Selection IDA-UDP-IC-2019-22 / Consultant on planning socio- economic development, local Component B: Institutional governance and citizen IDA / 57620 Post Direct Selection Direct 15,750.00 12,074.00 Completed 2019-03-05 2019-03-18 2019-03-15 2019-03-20 2019-05-19 2019-04-01 2019-11-15 2019-12-25 Strengthening participation in the decision- making process (Consultant#1 Team Leader) IDA-UDP-IC-2019-23 / Component B: Institutional Consultant on spatial IDA / 57620 Post Direct Selection Direct 15,000.00 11,146.29 Completed 2019-03-05 2019-03-18 2019-03-15 2019-03-20 2019-05-19 2019-03-25 2019-11-15 2019-12-25 Strengthening planning. (Consultant #2) IDA-UDP-IC-2019-21 / Component B: Institutional Consultant on legal zoning IDA / 57620 Post Direct Selection Direct 10,230.00 8,917.03 Completed 2019-03-05 2019-03-18 2019-03-15 2019-03-20 2019-05-19 2019-03-29 2019-11-15 2019-12-25 Strengthening and land use. (Consultant#3) IDA-UDP-IC-2019-33 / Component B: Institutional IDA / 57620 Post Direct Selection Direct 13,500.00 12,074.00 Completed 2019-03-05 2019-03-18 2019-03-15 2019-03-20 2019-05-19 2019-04-01 2019-11-15 2019-12-25 lawyer (Consultant#4) Strengthening IDA-UDP-IC-2019-35 / Individual Component B: Institutional Institutional Development IDA / 57620 Post Consultant Open 17,000.00 28,627.81 Signed 2019-05-06 2019-05-08 2019-06-24 2019-06-21 2019-07-15 2019-06-24 2019-08-19 2019-07-01 2020-02-15 Strengthening Specialist Selection Individual IDA-UDP-IC-2019-37 / Component A: Urban IDA / 57620 Post Consultant Limited 3,750.00 4,350.45 Signed 2019-07-12 2019-08-01 2019-07-17 2019-09-02 2019-08-07 2019-09-05 2019-09-11 2019-09-09 2020-03-09 Hydrogeologist Development Selection IDA-UDP-IC-2019-39 / Individual Component A: Urban Electrical and mechanical IDA / 57620 Post Consultant Limited 7,500.00 4,372.19 Completed 2019-07-12 2019-08-01 2019-07-17 2019-09-02 2019-08-07 2019-09-05 2019-09-11 2019-09-05 2020-03-09 2020-08-31 Development engineer Selection IDA-UDP-SSS-19-1 / Consulting services for Component A: Urban amending previously IDA / 57620 Post Direct Selection Direct 10,000.00 10,384.65 Signed 2019-10-31 2020-02-27 2019-11-10 2019-11-04 2020-01-14 2019-11-13 2020-07-12 Development developed Design and Estimate Documentation Individual IDA-UDP-IC-2020-1 / Civil Component B: Institutional IDA / 57620 Post Consultant Limited 2,700.00 20,647.16 Signed 2020-02-04 2020-02-03 2020-02-09 2020-01-31 2020-03-01 2020-02-04 2020-04-05 2020-02-04 2020-10-02 Engineer Strengthening Selection Individual IDA-UDP-IC-2019-38 / Component A: Urban IDA / 57620 Post Consultant Limited 3,750.00 0.00 Canceled 2019-07-12 2019-07-17 2019-08-07 2019-09-11 2020-03-09 Quality control Engineer Development Selection IDA-UDP-SSS-2020-3 / Component C: Under IDA / D1010 Post Direct Selection Direct 18,000.00 0.00 2020-12-28 2020-12-25 2021-01-07 2021-03-13 2021-09-09 Impact Assesment Implementation Support Implementation IDA-UDP-SSS-21-1 / Consulting services for author supervision of the additional Component A: Urban Under IDA / D1010 Post Direct Selection Direct 20,000.00 0.00 2021-05-04 2021-05-17 2021-05-07 2021-05-16 2021-09-06 expansion of the water supply Development Implementation network in the cities of Kerben and Sulukta (phase 2) IDA-UDP-IC-2021-1 / Consultant for the Individual Component A: Urban Under environmental and sanitary IDA / 57620 Post Consultant Limited 3,000.00 0.00 2021-05-21 2021-06-01 2021-05-26 2021-06-16 2021-07-21 2022-01-17 Development Implementation assessment of the sewage Selection system of the city of Sulukta Page 4 PLAN DE PASSATION DE MARCHÉS (Partie Textuelle) Information sur le Projet : Le Projet de Résilience et de Compétitivité Agricole est un Projet d’un coût global de $US259.6 millions dont $US200 millions de L’Association international pour le développement (IDA) pour un montant de $US50 millions, la Facilité pour la mise à échelle (SUF) pour un montant de $US150 millions. La contribution du Gouvernement du Burkina Faso est de $US13 millions, celle des bénéficiaires de $US29.4 millions. Il est attendu des institutions financières partenaires un co-financement des sous- projets de l’ordre de $US17.2 millions. L’objectif de développement du Projet est d’accroître la productivité du secteur agricole et l’accès au marché pour les petits producteurs et les petites et moyennes entreprises (PME) dans les chaines de valeur ciblées. Il est organisé autour de trois composantes opérationnelles qui sont : (i) amélioration de la productivité agricole ; (ii) amélioration de la compétitivité et accès au marché et (iii) le développement de l’agribusiness par la promotion du secteur privé. Agence d’exécution du Projet : Projet de Développement et de Compétitivité Agricole Date du plan de passation des marchés : Juin 2019 Période couverte par ce plan de passation des marchés : Juillet 2019 au 31 Décembre 2020 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016 tel que révisé en Novembre 2017 et Aout 2018) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec les paragraphes 5.3 à 5.6 du Règlement de passation des marchés, au cas où la procédure de passation des marchés est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics (Décret N°2017- 0049/PRES/PM/MINEFID portant procédures de passation, d’exécution et de règlement des marchés publics et des délégations de service public le 1er février 2017), ainsi que les DAOs standards nationaux, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : (i)Les clauses ci-dessous du décret visé ci-dessus ne sont pas pplicables  108 relative à la notion d’offre anormalement basse ou haute (inférieure ou supérieure à 15 % de la moyenne du montant prévisionnel du client et de la moyenne des offres reconnues conformes  111 à 115 sur la marge de préférence nationale, communautaire et locale  145 signature d’un nouveau marché lorsque la variation du montant dun marché et de plus de 30 % du montant initial (ii) Les dispositions ci-dessous des DAOs pour marchés de travaux et fournitures ne seront pas applicables  IS 32.3 (a) pour les marchés de travaux et 33.3 (b) pour les marchés de fournitures et d’équipement relatives au rejet de l’offre si elle est rectifiee de plus ou moins 15 %  IS 32.6 marché de travaux et 33.6 marché de fourniture et équipement relatives à la notion d’offres anormalement basses (iii) le dossier d’appel d’offres/à propositions devront avoir une disposition obligeant le Soumissionnaire/Proposant présentant une Offre/Proposition à déposer un agrément signé, qui sera joint à tout contrat éventuel, pour confirmer qu’il applique et respecte les Directives de la Banque pour la lutte contre la corruption, y compris sans limitation, le droit de la Banque de sanctionner et les droits de la Banque pour l’inspection et l’audit ; (iv) les documents de passation des marchés contiennent des dispositions convenues avec la Banque, destinées à atténuer les risques et impacts environnementaux, sociaux (y compris l’exploitation et les abus sexuels et les violences à caractère sexiste), et sur l’hygiène et la sécurité (« ESHS Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : s’applique lister les marchés ou mentionner ne s’applique pas Travaux : s’applique lister les marchés ou mentionner ne s’applique pas Autres informations pertinentes sur la passation des marchés « Sans objet ». PROCUREMENT Burkina Faso : Burkina Faso Agriculture Resilience and Competitiveness Project PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2020-01-23 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167945 GPN Date: Project Name: Burkina Faso Agriculture Resilience and Competitiveness Project Loan / Credit No: IDA / 64910, IDA / 64920 Agriculture Resilience and Competitiveness Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BF-PRECA-215424-CW-RFB / Project Coordination, Sécurisation et réhabilitation Pending Institutional Strengthening Single Stage - One 2021-10- des locaux de la Direction IDA / 64920 Post Request for Bids Open - National 236,300.00 0.00 Implementat 2021-05-01 2021-05-08 2021-06-07 2021-06-14 2021-07-12 and Contigent Emergency Envelope 10 Générale de la Coopération ion Response Component (DGCOOP) BF-PRECA-215479-CW-RFB / Project Coordination, Pending Construction d’un local au Institutional Strengthening Single Stage - One 2022-08- IDA / 64920 Post Request for Bids Open - National 1,712,330.00 0.00 Implementat 2021-06-01 2021-06-08 2021-07-23 2021-07-30 2021-08-27 profit de l’unité de gestion du and Contigent Emergency Envelope 22 ion projet Response Component Project Coordination, BF-PRECA-215447-CW-RFB / Pending Institutional Strengthening Single Stage - One 2021-12- Construction des offices au IDA / 64920 Post Request for Bids Open - National 231,165.00 0.00 Implementat 2021-07-01 2021-07-06 2021-08-05 2021-08-10 2021-09-07 and Contigent Emergency Envelope 06 profit des ZAT ion Response Component BF-PRECA-212967-CW-RFB / Pending Improving Competitiviness Single Stage - One 2021-09- Construction de magasins de IDA / 64920 Post Request for Bids Open - National 1,077,000.00 0.00 Implementat 2021-03-01 2021-03-08 2021-04-07 2021-04-14 2021-05-12 and Fostering Market Access Envelope 09 stockage et d'aires de séchage ion BF-PRECA-215393-CW-RFQ / Travaux de réhabilitation des comptoirs d'achat, des infrastructures des postes de Pending contrôle phytosanitaire des Improving Competitiviness Single Stage - One 2021-09- IDA / 64910 Post Request for Bids Open - National 470,000.00 0.00 Implementat 2021-04-15 2021-04-20 2021-05-20 2021-05-27 2021-06-17 locaux des Directions and Fostering Market Access Envelope 15 ion Provinciales de l'Agriculture et des Aménagements Hydro- agricoles et des magasins de stockage BF-PRECA-235380-CW-RFB / Project Coordination, Request for Bids - Pending Réhabilitation des locaux au Institutional Strengthening Single Stage - One Small Works SPD 2021-11- IDA / 64910 Post Request for Bids Open - National 203,200.00 0.00 Implementat 2021-06-10 2021-06-17 2021-07-17 2021-07-24 2021-08-14 profit des unités de gestion and Contigent Emergency Envelope (1 envelope 12 ion régionales du PReCA Response Component process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PRECA-151445-GO-RFQ Under / Acquisition de mobilier de Enhancing Agriculture Request for Single Stage - One IDA / 64910 Post Limited 78,000.00 0.00 Implementati 2020-03-14 2020-04-18 2020-05-02 bureau pour l'UGP au profit Productivity Quotations Envelope on du PRéCA BF-PRECA-151521-GO-RFQ / Acquisition de matériel et bureautique informatique Under Enhancing Agriculture Request for Single Stage - One (ordinateurs, onduleurs, IDA / 64910 Post Limited 78,000.00 0.00 Implementati 2020-03-15 2020-04-19 2020-05-19 Productivity Quotations Envelope imprimantes et on photocopieurs, scanner etc) au profit du PReCA BF-PRECA-151443-GO-UN / Acquisition de matériel roulant (01 station wagon V8, Under Enhancing Agriculture UN Agencies 05 stations Wagon de type IDA / 64910 Post Direct 2,268,000.00 0.00 Implementati 2020-04-15 2020-05-26 2020-04-20 2020-05-25 2020-08-23 Productivity (Direct) PRADO, 10 berline, 30 Pick Up on et 50 motocyclette) au profit du PReCA BF-PRECA-151523-GO-RFB / Under Acquisition d'un logiciel de Enhancing Agriculture Request for Single Stage - One IDA / 64910 Post Limited 100,000.00 0.00 Implementati 2020-03-09 2020-04-20 2020-06-19 suivi évaluation au profit du Productivity Quotations Envelope on PReCA BF-PRECA-151522-GO-DIR / Under Acquisition du logiciel de Enhancing Agriculture Request for Single Stage - One IDA / 64910 Post Limited 100,000.00 0.00 Implementati 2020-06-15 2020-08-10 2020-09-09 gestion financière et Productivity Quotations Envelope on comptable au profit du PReCA Project Coordination, BF-PRECA-214864-GO-RFQ Pending Institutional Strengthening Request for Single Stage - One / Acquisition de fournitures IDA / 64920 Post Limited 34,245.00 0.00 Implementati 2021-02-17 2021-03-23 2021-12-18 and Contigent Emergency Quotations Envelope de bureau au profit de l'UGP on Response Component BF-PRECA-214900-GO-RFQ Pending / Acquisition de smartphones, Enhancing Agriculture Request for Single Stage - One IDA / 64910 Post Limited 34,250.00 0.00 Implementati 2021-03-04 2021-04-04 2021-05-04 de GPS et d'appareil photo Productivity Quotations Envelope on pour la collecte de données Project Coordination, BF-PRECA-215172-GO-RFB / Pending Institutional Strengthening Single Stage - One Acquisition et installation de IDA / 64920 Post Request for Bids Open - National 102,740.00 0.00 Implementati 2021-03-01 2021-03-11 2021-04-10 2021-04-15 2021-05-06 2021-07-05 and Contigent Emergency Envelope groupes électrogènes on Response Component BF-PRECA-215464-GO-RFQ Project Coordination, / Acquisition et installation Pending Institutional Strengthening Request for Single Stage - One d'équipements de IDA / 64910 Post Limited 34,245.00 0.00 Implementati 2021-05-05 2021-06-16 2021-08-15 and Contigent Emergency Quotations Envelope communication au profit de on Response Component l’Unité de gestion du PReCA Page 1 BF-PRECA-215467-GO-RFB / Acquisition d’équipements Project Coordination, Pending informatiques au titre de Institutional Strengthening Single Stage - One IDA / 64920 Post Request for Bids Open - National 196,915.00 0.00 Implementati 2021-04-01 2021-04-11 2021-05-11 2021-05-16 2021-06-06 2021-08-20 l'appui institutionnel et and Contigent Emergency Envelope on installation de connexion Response Component internet BF-PRECA-215115-GO-RFB / Acquisition d'équipements pour les points de contrôle sanitaire et phyto sanitaires, les laboratoires nationaux Pending Improving Competitiviness Single Stage - One spécialisés dans le contrôle IDA / 64920 Post Request for Bids Open - National 765,750.00 0.00 Implementati 2021-03-01 2021-03-06 2021-04-05 2021-04-10 2021-05-01 2021-07-15 and Fostering Market Access Envelope sanitaire et de la DGPV on (Microscope optiques, Loupe, Humidimètre, Microscopes, Appareil HPLC, lecteur de barette) BF-PRECA-215203-GO-RFB / Acquisition d'équipements de Project Coordination, Pending bureau au titre de l'appui Institutional Strengthening Single Stage - One IDA / 64920 Post Request for Bids Open - National 216,180.00 0.00 Implementati 2021-04-01 2021-04-11 2021-05-11 2021-05-16 2021-06-06 2021-08-20 institutionnel (armoires de and Contigent Emergency Envelope on rangement, bureaux , Response Component fauteuils , chaises...) BF-PRECA-217711-GO-RFQ Pending / Acquisition d'un véhicule Enhancing Agriculture Request for Single Stage - One IDA / 64910 Post Limited 160,000.00 0.00 Implementati 2021-03-20 2021-04-24 2021-06-08 automobile Station Wagon de Productivity Quotations Envelope on type V8 BF-PRECA-228905-GO-RFB / Pending Acquisition de matériel pour Improving Competitiviness Single Stage - One IDA / 64920 Post Request for Bids Open - National 375,770.00 0.00 Implementati 2021-05-15 2021-05-20 2021-06-19 2021-07-03 2021-07-31 2021-09-29 l'équipement des magasins de and Fostering Market Access Envelope on stockage BF-PRECA-229181-GO-RFQ Project Coordination, / fourniture et pose Pending Institutional Strengthening Request for Single Stage - One d'extincteurs, de climatiseurs IDA / 64920 Post Limited 26,500.00 0.00 Implementati 2021-05-03 2021-06-17 2021-07-17 and Contigent Emergency Quotations Envelope et de cloisons alu vitrés aux on Response Component profit de l'UGP et des UGR BF-PRECA-229182-GO-RFQ Project Coordination, / Réalisation d'outils de Pending Institutional Strengthening Request for Single Stage - One communication au profit du IDA / 64910 Post Limited 36,200.00 0.00 Implementati 2021-06-04 2021-07-23 2021-07-26 and Contigent Emergency Quotations Envelope PReCA (dépliants, enseigne, on Response Component support audiovisuel...) BF-PRECA-235386-GO-RFQ / Acquisition de petits Pending Enhancing Agriculture Request for Single Stage - One matériels et intrants agricoles IDA / 64910 Post Limited 16,930.00 0.00 Implementati 2021-06-02 2021-06-17 2021-07-01 Productivity Quotations Envelope pour la réalisation des on activités de champs écoles NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Coordination, BF-PRECA-214853-NC-RFQ / Under Institutional Strengthening Request for Single Stage - One Assurance véhicules IDA / 64920 Post Limited 34,250.00 0.00 Implementati 2021-02-08 2021-03-11 2021-04-01 and Contigent Emergency Quotations Envelope automobiles on Response Component Project Coordination, BF-PRECA-214859-NC-RFQ / Under Institutional Strengthening Request for Single Stage - One Assurance santé du personnel IDA / 64920 Post Limited 85,600.00 0.00 Implementati 2021-02-18 2021-03-21 2021-04-11 and Contigent Emergency Quotations Envelope de l'UGP on Response Component BF-PRECA-215173-NC-RFQ / Project Coordination, Pending Service d’entretien et de Institutional Strengthening Request for Single Stage - One IDA / 64920 Post Limited 15,410.00 0.00 Implementati 2021-02-04 2021-02-28 2022-02-23 nettoyage des locaux de and Contigent Emergency Quotations Envelope on l’Unité de gestion PRéCA Response Component Project Coordination, BF-PRECA-215182-NC-RFQ / Pending Institutional Strengthening Request for Single Stage - One Services de gardiennage des IDA / 64920 Post Limited 15,410.00 0.00 Implementati 2021-02-18 2021-03-16 2022-03-11 and Contigent Emergency Quotations Envelope locaux du projet on Response Component BF-PRECA-216422-NC-RFQ / Project Coordination, Pending Location de bureaux au profit Institutional Strengthening Request for Single Stage - One IDA / 64920 Post Limited 102,740.00 0.00 Implementati 2021-01-28 2021-02-14 2022-02-09 de l'Unité de Gestion du and Contigent Emergency Quotations Envelope on PReCA Response Component BF-PRECA-215184-NC-RFQ / Project Coordination, Pending Fourniture de services Institutional Strengthening IDA / 64920 Post Direct Selection Direct 42,800.00 0.00 Implementati 2021-03-01 2021-03-06 2021-04-03 2022-04-03 d'entretien des véhicules and Contigent Emergency on automobiles Response Component CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PRECA-151524-CS-CQS / Consultant Etudes d'impact Enhancing Agriculture IDA / 64910 Post Qualification Limited 35,000.00 0.00 Under Review 2020-01-06 2021-03-03 2020-01-13 2020-01-20 2020-02-03 2020-03-04 environnementales et sociales Productivity Selection du site de Dangoumana (EIES) BF-PRECA-151527-CS-CQS / Etude du Plan d'Actions de Consultant Enhancing Agriculture Réinstallation des personnes IDA / 64910 Post Qualification Limited 65,000.00 0.00 Under Review 2020-01-06 2021-03-03 2020-01-13 2020-01-20 2020-02-03 2020-03-29 Productivity affectées (PAR) du site de Selection Dangoumana Page 2 BF-PRECA-151528-CS-CQS / Consultant Etudes d'impact Enhancing Agriculture IDA / 64910 Post Qualification Limited 35,000.00 0.00 Under Review 2020-01-13 2021-03-03 2020-01-20 2020-01-27 2020-02-10 2020-03-11 environnementales et sociales Productivity Selection du site de Bissan (EIES) BF-PRECA-151529-CS-CQS / Etude du Plan d'Actions de Consultant Enhancing Agriculture Réinstallation des personnes IDA / 64910 Post Qualification Limited 65,000.00 0.00 Under Review 2020-01-13 2021-03-03 2020-01-20 2020-01-27 2020-02-10 2020-04-05 Productivity affectées (PAR) du site de Selection Bissan BF-PRECA-151530-CS-CQS / Consultant Etudes d'impact Enhancing Agriculture IDA / 64910 Post Qualification Limited 35,000.00 0.00 Under Review 2020-01-27 2021-03-03 2020-02-03 2020-02-10 2020-02-24 2020-03-25 environnementales et sociales Productivity Selection du site de Sindou (EIES) BF-PRECA-151531-CS-CQS / Etude du Plan d'Actions de Consultant Enhancing Agriculture Réinstallation des personnes IDA / 64910 Post Qualification Limited 65,000.00 0.00 Under Review 2020-01-27 2021-03-03 2020-02-03 2020-02-10 2020-02-24 2020-04-19 Productivity affectées (PAR) du site de Selection Sindou BF-PRECA-151532-CS-CQS / Etudes d'impact Consultant Enhancing Agriculture environnementales et sociales IDA / 64910 Post Qualification Limited 35,000.00 0.00 Under Review 2020-01-27 2021-03-03 2020-02-03 2020-02-10 2020-02-24 2020-03-25 Productivity du site de Lémourdougou Selection (EIES) BF-PRECA-151533-CS-CQS / Etude du Plan d'Actions de Consultant Enhancing Agriculture Réinstallation des personnes IDA / 64910 Post Qualification Limited 65,000.00 0.00 Under Review 2020-01-27 2021-03-03 2020-02-03 2020-02-10 2020-02-24 2020-04-19 Productivity affectées (PAR) du site de Selection Lémourdougou BF-PRECA-151534-CS-QCBS / Etudes d’avant-projet sommaire et détaille pour la réhabilitation et l’extension Enhancing Agriculture Quality And Cost- IDA / 64910 Post Open - International 240,000.00 0.00 Under Review 2020-01-30 2020-04-01 2020-02-20 2020-03-19 2020-04-16 2020-05-16 2020-06-20 2020-07-25 2020-10-23 de la plaine aménagée de Productivity Based Selection Banzon dans la province du Kénédougou, région des Hauts-Bassins BF-PRECA-151535-CS-QCBS / Etude d’avant-projet détaille pour la l’aménagement de bas- Enhancing Agriculture Quality And Cost- Under IDA / 64910 Post Open - International 345,000.00 0.00 2020-01-30 2020-04-01 2020-02-20 2020-12-29 2020-04-04 2020-05-02 2020-06-01 2020-07-06 2020-08-10 2020-12-08 fonds dans les provinces de la Productivity Based Selection Implementation Léraba et de la Comoé, région des cascades BF-PRECA-151576-CS-LCS / Recrutement d'un auditeur Enhancing Agriculture Least Cost Under pour l'audit externe annuel IDA / 64910 Post Open - National 94,000.00 0.00 2020-01-30 2020-04-01 2020-02-20 2020-03-19 2020-04-16 2020-05-16 2020-06-20 2020-07-25 2020-09-08 Productivity Selection Implementation du Projet (2020-2021 - 2022) dans le cadre du PReCA BF-PRECA-151577-CS-QCBS Consultant / Recrutement du personnel Enhancing Agriculture IDA / 64910 Post Qualification Open - National 60,000.00 53,359.22 Completed 2020-02-04 2019-11-20 2020-02-18 2020-03-10 2020-03-23 2020-03-17 2020-04-23 2020-04-07 2020-05-18 2020-07-06 2020-05-20 du Projet de Résilience et de Productivity Selection Compétitivité Agricole (PReCA) BF-PRECA-174009-CS-CQS / Études d’impact environnemental et social (EIES) dans le cadre des travaux d’aménagement Consultant Improving Competitiviness Under d’environ 130 km de pistes IDA / 64910 Post Qualification Open - National 76,362.00 0.00 2020-06-01 2021-05-06 2020-06-22 2020-07-13 2020-07-27 2020-08-31 2020-09-30 and Fostering Market Access Implementation rurales et la réhabilitation Selection d’environ 215 km de routes non-revêtues dans les régions de Boucle du Mouhoun, des Cascades, des Hauts Bassins BF-PRECA-174010-CS-CQS / Etudes pour la préparation d’un Plan d’Actions pour la Réinstallation des personnes affectées des travaux Consultant Improving Competitiviness Under d’aménagement d’environ IDA / 64910 Post Qualification Open - National 109,567.00 0.00 2020-06-01 2021-05-06 2020-06-22 2020-07-13 2020-07-27 2020-08-31 2020-09-30 and Fostering Market Access Implementation 130 km de pistes rurales et la Selection réhabilitation d’environ 215 km de routes non-revêtues dans les régions de Boucle du Mouhoun, Project Coordination, BF-PRECA-211881-CS-CQS / Consultant Institutional Strengthening Etude sur la situation de IDA / 64920 Post Qualification Open - National 82,000.00 0.00 Under Review 2021-01-15 2021-01-12 2021-01-29 2021-02-19 2021-03-05 2021-03-24 2021-05-23 and Contigent Emergency référence Selection Response Component BF-PRECA-215013-CS-CQS / Etude d'avant Projet Détaillée Consultant Enhancing Agriculture Pending (APD) de la construction de la IDA / 64920 Post Qualification Open - National 42,800.00 0.00 2021-03-01 2021-03-15 2021-04-12 2021-05-12 2021-05-31 2021-08-29 Productivity Implementation ligne de haute tension (HT) Selection de Bissan BF-PRECA-215026-CS-CQS / Etude d’Impact Consultant Enhancing Agriculture Pending Environnemental et Social IDA / 64920 Post Qualification Open - National 34,245.00 0.00 2021-07-30 2021-08-13 2021-09-03 2021-09-17 2021-10-08 2021-12-07 Productivity Implementation (EIES) de la construction de la Selection ligne électrique de Bissan BF-PRECA-215030-CS-CQS / Elaboration du Plan d'action Consultant de réinstallation des Enhancing Agriculture Pending IDA / 64910 Post Qualification Open - National 51,370.00 0.00 2021-08-30 2021-09-13 2021-10-04 2021-10-18 2021-10-22 2022-01-20 personnes affectées par le Productivity Implementation Selection projet de construction de la ligne électrique de Bissan BF-PRECA-215481-CS-CQS / Etudes et analyses sur la Consultant protection et le Enhancing Agriculture Pending IDA / 64920 Post Qualification Open - National 34,245.00 0.00 2021-03-15 2021-03-29 2021-04-19 2021-05-03 2021-05-17 2021-08-15 développement des bassins Productivity Implementation Selection versants Conservation de l'eau et des sols Page 3 BF-PRECA-215491-CS-CQS / Développement de la Consultant Enhancing Agriculture plateforme électronique de IDA / 64920 Post Qualification Open - National 111,300.00 0.00 Canceled 2021-03-15 2021-03-29 2021-04-19 2021-05-03 2021-05-17 2021-11-13 Productivity distribution des intrants et du Selection matériel agricole BF-PRECA-214887-CS-CQS / Project Coordination, Consultant Elaboration stratégie de Institutional Strengthening Pending IDA / 64910 Post Qualification Open - National 17,120.00 0.00 2021-02-21 2021-03-07 2021-03-20 2021-03-27 2021-04-02 2021-06-01 communication assortie d'un and Contigent Emergency Implementation Selection plan de communication Response Component BF-PRECA-215216-CS-QCBS / Etude d'avant projet détaillé Enhancing Agriculture Quality And Cost- Under (APD) pour la réalisation des IDA / 64920 Post Open - International 1,100,000.00 0.00 2021-03-01 2021-04-08 2021-03-15 2021-05-19 2021-03-27 2021-05-08 2021-05-15 2021-06-05 2021-06-26 2021-12-23 Productivity Based Selection Implementation travaux d'aménagement de la plaine de Bissan BF-PRECA-215495-CS-QCBS / Etudes techniques pour la réalisation des travaux de réhabilitation et de Enhancing Agriculture Quality And Cost- Under IDA / 64920 Post Open - International 1,179,450.00 0.00 2021-02-01 2021-02-01 2021-02-15 2021-03-02 2021-03-08 2021-04-22 2021-05-06 2021-06-03 2021-07-01 2021-11-28 construction des pistes Productivity Based Selection Implementation rurales dans les régions du Boucle du Mouhoun, Hauts Bassins, Cascades et du Nord BF-PRECA-215499-CS-CQS / Maitrise d'ouvrage déléguée Enhancing Agriculture Quality And Cost- Under IDA / 64920 Post Open - International 845,685.00 0.00 2021-02-15 2021-02-11 2021-03-01 2021-02-28 2021-03-22 2021-05-03 2021-05-10 2021-05-31 2021-06-28 2025-06-07 pour la mise en œuvre des Productivity Based Selection Implementation activités du Guichet 2 BF-PRECA-228922-CS-CQS / recrutement d'une ONG chargée de la mise en œuvre Consultant du Plan d'action de Enhancing Agriculture IDA / 64920 Post Qualification Open - National 142,000.00 0.00 Under Review 2021-04-15 2021-05-14 2021-04-25 2021-05-16 2021-05-30 2021-06-20 2021-10-18 réinstallation des personnes Productivity Selection affectées par les travaux d'aménagement hydroagricole de BANZON BF-PRECA-212975-CS-CQS / Consultant Suivi contrôle des travaux de Improving Competitiviness Under IDA / 64920 Post Qualification Open - National 72,200.00 0.00 2021-02-15 2021-06-10 2021-03-01 2021-03-22 2021-04-05 2021-04-19 2021-10-16 construction de magasins et and Fostering Market Access Implementation Selection aires de séchage BF-PRECA-228928-CS-CQS / Etude technique et suivi Project Coordination, contrôle des travaux de Consultant Institutional Strengthening Under sécurisation et de IDA / 64920 Post Qualification Open - National 25,685.00 0.00 2021-04-30 2021-05-14 2021-05-14 2021-06-02 2021-06-09 2021-06-30 2021-10-28 and Contigent Emergency Implementation réhabilitation des bureaux de Selection Response Component la Direction Générale de la Coopération (DGCOOP) BF-PRECA-228932-CS-CQS / Etude technique en vue de la Consultant Improving Competitiviness Pending réalisation de chambres IDA / 64920 Post Qualification Limited 13,700.00 0.00 2021-04-30 2021-05-14 2021-05-28 2021-06-11 2021-07-11 and Fostering Market Access Implementation froides solaires pour stockage Selection de légumes BF-PRECA-229092-CS-CQS / Suivi contrôle des travaux de réhabilitation des magasins de stockage, des comptoirs Project Coordination, d'achat, des locaux au profit Consultant Institutional Strengthening Pending des postes de contrôle IDA / 64920 Post Qualification Open - National 44,520.00 0.00 2021-04-30 2021-05-14 2021-06-04 2021-06-18 2021-07-09 2021-12-06 and Contigent Emergency Implementation phytosanitaire et des Selection Response Component directions provinciales de l'agriculture, des aménagements hydro- agricoles BF-PRECA-215427-CS-INDV Project Coordination, / Elaboration des dossiers Consultant Institutional Strengthening Under techniques et suivi contrôle IDA / 64920 Post Qualification Open - National 25,685.00 0.00 2021-03-15 2021-06-10 2021-03-29 2021-04-17 2021-04-24 2021-05-15 2021-11-11 and Contigent Emergency Implementation des travaux de construction Selection Response Component des offices au profit des ZAT BF-PRECA-229086-CS-CQS / Etude architecturale et suivi Project Coordination, Consultant architectural des travaux de Institutional Strengthening Pending IDA / 64920 Post Qualification Open - National 85,620.00 0.00 2021-06-25 2021-07-09 2021-07-30 2021-08-29 2021-09-19 2022-11-13 construction d’un local au and Contigent Emergency Implementation Selection profit de l’unité de gestion du Response Component projet BF-PRECA-229089-CS-CQS / Project Coordination, Etude d'ingénierie et direction Consultant Institutional Strengthening Pending des travaux de construction IDA / 64920 Post Qualification Open - National 85,620.00 0.00 2021-05-25 2021-06-08 2021-06-27 2021-07-04 2021-07-25 2022-09-18 and Contigent Emergency Implementation d’un local au profit de l’unité Selection Response Component de gestion du projet BF-PRECA-235762-CS-CQS / Project Coordination, Développement de la Consultant Institutional Strengthening Pending plateforme électronique de IDA / 64920 Post Qualification Limited 68,500.00 0.00 2021-06-15 2021-06-22 2021-07-02 2021-07-16 2021-09-29 and Contigent Emergency Implementation distribution des intrants et Selection Response Component matériels agricoles INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PRECA-151578-CS-INDV / Etude d’évaluation de la Individual Enhancing Agriculture Pending sécurité du complexe barrage IDA / 64910 Post Consultant Limited 69,000.00 0.00 2019-12-30 2020-01-04 2020-01-11 2020-01-25 2020-03-25 Productivity Implementation Mouhoun -vanne de Léry et Selection ouvrages associés BF-PRECA-151579-CS-INDV Individual / Etude d’évaluation de la Enhancing Agriculture Pending IDA / 64910 Post Consultant Limited 69,000.00 0.00 2019-12-30 2020-01-04 2020-01-11 2020-01-25 2020-03-25 sécurité du barrage de Productivity Implementation Selection Samendéni Page 4 BF-PRECA-205793-CS-INDV Individual / Etude d'impact Enhancing Agriculture IDA / 64920 Post Consultant Limited 35,000.00 0.00 Under Review 2020-12-15 2020-11-24 2020-12-20 2020-12-27 2021-01-10 2021-03-11 environnemental et social de Productivity Selection plaine de BAMA BF-PRECA-205794-CS-INDV / Elaboration du Plan d'Action Individual de Réinstallation des Enhancing Agriculture IDA / 64920 Post Consultant Limited 65,000.00 0.00 Under Review 2020-12-15 2020-11-24 2020-12-20 2020-12-27 2021-01-10 2021-04-10 Personnes Affectées par le Productivity Selection Projet de réhabilitation de la plaine de BAMA BF-PRECA-205796-CS-INDV Individual / Elaboration d’un Cadre de Enhancing Agriculture Under IDA / 64920 Post Consultant Limited 25,000.00 0.00 2020-12-05 2020-11-24 2020-12-10 2020-12-17 2020-12-31 2021-03-01 Gestion Environnmentale et Productivity Implementation Selection Sociale (CGES) du PRSA BF-PRECA-205797-CS-INDV / Elaboration d’un Cadre de Individual Enhancing Agriculture Under Politique de Réinstallation IDA / 64920 Post Consultant Limited 25,000.00 0.00 2020-12-05 2020-11-24 2020-12-10 2020-12-17 2020-12-31 2021-03-01 Productivity Implementation (CPR) des populations Selection affectées par le PRSA BF-PRECA-205799-CS-INDV / Elaboration d’un Plan de Individual Enhancing Agriculture Under Gestion des Pestes et IDA / 64920 Post Consultant Limited 25,000.00 0.00 2020-12-05 2020-11-24 2020-12-10 2020-12-17 2020-12-31 2021-03-01 Productivity Implementation Pesticides dans le cadre de la Selection mise en oeuvre du PRSA BF-PRECA-206165-CS-INDV / Recrutement d'un consultant individuel pour la finalisation Individual des TDRS relatifs aux études Enhancing Agriculture IDA / 64920 Post Consultant Limited 6,200.00 0.00 Under Review 2020-12-01 2020-12-03 2020-12-06 2020-12-13 2020-12-27 2021-09-23 d'impact environnemental et Productivity Selection social (EIES), à l'élaboration des PAR et à l’assurance qualité des rapports BF-PRECA-215480-CS-INDV / Etudes visant à renforcer la Individual Enhancing Agriculture Pending définition des politiques et IDA / 64920 Post Consultant Limited 17,120.00 0.00 2021-04-01 2021-04-15 2021-04-29 2021-05-13 2021-07-12 Productivity Implementation des bonnes pratiques Selection agricoles BF-PRECA-215501-CS-INDV Individual / Recrutement d’un expert en Enhancing Agriculture Pending IDA / 64920 Post Consultant Limited 34,245.00 0.00 2021-02-15 2021-02-22 2021-03-08 2021-04-05 2021-12-31 irrigation pour la revue qualité Productivity Implementation Selection des rapports d'études BF-PRECA-215236-CS-INDV / Contrôle à pied d'oeuvre des Project Coordination, travaux de réhabilitation des Individual Institutional Strengthening locaux des directions IDA / 64920 Post Consultant Limited 8,560.00 0.00 Canceled 2021-03-31 2021-04-05 2021-04-26 2021-05-31 2021-08-14 and Contigent Emergency provinciales de l'agriculture et Selection Response Component des aménagements hydro- agricoles BF-PRECA-215398-CS-INDV / Mission de contrôle à pied Individual Improving Competitiviness d'oeuvre des travaux de IDA / 64920 Post Consultant Limited 1,275.00 0.00 Canceled 2021-04-01 2021-04-06 2021-04-20 2021-05-11 2021-07-25 and Fostering Market Access réhabilitation des comptoirs Selection d'achat BF-PRECA-215312-CS-INDV / Contrôle à pied d'oeuvre des Individual Improving Competitiviness travaux de réhabilitation des IDA / 64920 Post Consultant Limited 6,850.00 0.00 Canceled 2021-03-01 2021-03-06 2021-03-27 2021-05-01 2021-07-30 and Fostering Market Access locaux au profit des postes de Selection contrôle phytosanitaire BF-PRECA-235394-CS-INDV Project Coordination, / Elaboration d'un plan de Individual Institutional Strengthening Pending renforcement des capacités IDA / 64920 Post Consultant Limited 17,120.00 0.00 2021-06-30 2021-07-05 2021-07-12 2021-07-26 2021-09-09 and Contigent Emergency Implementation techniques du personnel du Selection Response Component PReCA BF-PRECA-235550-CS-INDV / Conception de modèle Individual économiques assortis du plan Improving Competitiviness Pending IDA / 64920 Post Consultant Limited 29,110.00 0.00 2021-06-15 2021-06-29 2021-07-13 2021-07-27 2021-10-10 d’affaire du système and Fostering Market Access Implementation Selection d’information des marchés agro-sylvo-pastoraux (SIMA) Page 5 PROCUREMENT PLAN Project information: URUGUAY – P159771 – Providing Quality Education in Uruguay Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT Uruguay : Improving the Quality of Initial and Primary Education in Uruguay PLAN General Information Country: Uruguay Bank’s Approval Date of the Original Procurement Plan: 2017-05-11 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159771 GPN Date: Project Name: Improving the Quality of Initial and Primary Education in Uruguay Loan / Credit No: IBRD / 86750 National administration of Public Education Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents as Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned UY-ANEP-14468-CW-RFB ESC RIVERA 2017 / Refacción Single Stage - One 2017-09- 2017-09- 2017-10- 2017-10- 2018-01- 2019-01- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 0.00 Canceled y Rehabilitación en Escuela - Envelope 01 01 02 12 20 15 Departamento de Rivera UY-ANEP-14484-CW-RFB ESC87 PAYSANDU 2017 / Single Stage - One 1,637,706.8 2017-01- 2017-01- 2017-01- 2017-02- 2017-02- 2017-03- 2017-03- 2017-07- 2017-06- 2018-07- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed Obra Refacción y Envelope 9 13 13 13 15 23 15 15 07 29 01 Rehabilitación Esc 87 Dep de Paysandú UY-ANEP-14560-CW-RFB- ESC-16-TYTRES 2017 / Obras Single Stage - One 1,117,654.6 2017-03- 2017-03- 2017-03- 2017-05- 2017-05- 2017-05- 2017-10- 2017-08- 2017-10- 2018-05- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed en Escuela - Departamento de Envelope 9 27 27 31 12 12 19 27 31 27 31 Treinta y Tres UY-ANEP-14469-CW-RFB ESC 160 MDEO 2017 / Single Stage - One 2017-06- 2017-06- 2017-06- 2017-07- 2017-08- 2017-08- 2017-08- 2017-11- 2017-11- 2018-11- IBRD / 86750 Early Education Post Request for Bids Open - National 530,000.00 918,830.08 Signed Refacción y Rehabilitación Envelope 15 29 26 27 10 06 22 14 15 09 Escuela 160 Montevideo UY-ANEP-14486-CW-RFB ESC 8 FLORIDA 2017 / Obra Single Stage - One 1,211,792.7 2017-03- 2017-03- 2017-03- 2017-05- 2017-05- 2017-05- 2017-05- 2017-08- 2017-09- 2018-05- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed Nueva, REfacción y Ampliación Envelope 9 27 27 31 12 12 19 15 31 06 31 Esc 8 Dep. de Florida UY-ANEP-17779-CW-RFB- ESC 11 SALTO / Obra Single Stage - One 1,256,108.9 2017-06- 2017-06- 2017-06- 2017-07- 2017-08- 2017-08- 2017-08- 2017-11- 2017-11- 2018-11- refacción y rehabiliatación IBRD / 86750 Early Education Post Request for Bids Open - National 1,200,000.00 Signed Envelope 6 20 29 26 26 03 04 18 30 16 30 Escuela N° 11 Salto, Departamento de Salto UY-ANEP-17781-CW-RFB-8 FRAILE MUERTO / Obra Refacción y Rehabilitación Single Stage - One 1,203,959.2 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- 2017-08- 2017-11- 2017-11- 2018-10- IBRD / 86750 Early Education Post Request for Bids Open - National 1,200,000.00 Signed Escuela N° 8 Fraile Muerto, Envelope 1 20 21 26 26 26 04 02 30 15 01 Melo, Departamento de Cerro Largo. UY-ANEP-17782-CW-RFB- 124 MELILLA / Obra de Single Stage - One 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- 2017-08- 2017-11- 2017-10- 2018-06- Refacción y Rehabilitación IBRD / 86750 Early Education Post Request for Bids Open - National 800,000.00 795,495.80 Signed Envelope 20 22 26 26 26 04 14 30 23 29 Escuela N° 124 Melilla, Departamento de Montevideo. UY-ANEP-17923-CW-RFB- ESC 39 MERCEDES / Obra en Single Stage - One 1,425,178.3 2015-06- 2015-06- 2015-06- 2015-07- 2015-07- 2015-07- 2015-07- 2015-11- 2015-11- 2017-07- IBRD / 86750 Early Education Post Request for Bids Open - National 357,961.38 Signed Escuela N° 39 Mercedes Envelope 5 14 11 14 20 20 24 24 03 05 31 Departamento de Soriano UY-ANEP-17918-CW-RFB- ESC 44 MDEO / Obra en Single Stage - One 2016-03- 2016-03- 2016-03- 2016-05- 2016-05- 2016-05- 2018-05- 2016-12- 2016-12- 2017-12- IBRD / 86750 Early Education Post Request for Bids Open - National 470,274.41 853,981.17 Signed Escuela N° 44 Departamento Envelope 31 31 31 03 03 10 10 23 23 31 Montevideo UY-ANEP-17917-CW-RFB- ESC 385 MARACANA / Obra Single Stage - One 1,156,827.1 2016-08- 2016-08- 2016-08- 2016-09- 2016-09- 2016-09- 2016-09- 2017-02- 2017-02- 2017-12- en Escuela N° 385 Barrio IBRD / 86750 Early Education Post Request for Bids Open - National 817,953.59 Signed Envelope 5 08 08 08 09 09 19 19 23 24 31 Maracana Departamento Montevideo UY-ANEP-17789-CW-RFB ESC 24 VICHADER0 / Obra en Single Stage - One 2016-08- 2016-08- 2016-08- 2016-09- 2016-09- 2016-09- 2016-09- 2017-02- 2017-02- 2017-07- IBRD / 86750 Early Education Post Request for Bids Open - National 446,174.48 519,247.43 Signed Escuela N° 24 Vichadero Envelope 01 01 01 12 12 27 27 15 15 31 Departamento Rivera UY-ANEP-17922-CW-RFB- 130 COLONIA / Obra en Single Stage - One 1,092,332.8 2015-06- 2015-06- 2015-06- 2015-07- 2015-07- 2015-07- 2015-07- 2016-02- 2016-02- 2017-06- IBRD / 86750 Early Education Post Request for Bids Open - National 67,330.59 Signed Escuela N° 130 Colonia, Envelope 0 17 17 21 22 22 31 31 24 24 30 Departamento de Colonia UY-ANEP-17921-CW-RFB- ESC 122 CARAGUATA / Obra Single Stage - One 1,176,404.1 2015-07- 2015-07- 2015-07- 2015-08- 2015-08- 2015-08- 2015-08- 2016-02- 2016-02- 2017-06- en Escuela N° 122 Toscas IBRD / 86750 Early Education Post Request for Bids Open - National 110,459.28 Signed Envelope 6 01 01 05 05 05 18 18 24 24 30 Caraguatá, Departamento Tacuarembó UY-ANEP-17919-CW-RFB- ESC 154 PENAROL / Obra en Single Stage - One 1,157,239.9 2015-07- 2015-07- 2015-07- 2015-08- 2015-08- 2015-11- 2015-11- 2016-03- 2016-03- 2017-06- IBRD / 86750 Early Education Post Request for Bids Open - National 57,439.21 Signed Escuela N° 154 Barrio Peñarol Envelope 5 08 08 12 12 12 27 27 29 29 30 Departamento Montevideo UY-ANEP-14465-CW-RFB - ESC 17 MALDONADO / Single Stage - One 2017-06- 2017-06- 2017-07- 2017-07- 2017-10- 2018-10- Refacción y Rehabilitación IBRD / 86750 Early Education Post Request for Bids Open - National 921,000.00 0.00 Canceled Envelope 01 01 02 12 20 15 Escuela 17 Gregorio Aznares Departamento Maldonado UY-ANEP-14470-CW-RFB ESC LAS PIEDRAS2017 / Single Stage - One 2017-08- 2017-08- 2017-09- 2017-09- 2017-12- 2018-12- Rehabilitación y Refacción IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 0.00 Canceled Envelope 01 01 01 11 20 15 Escuela Las Piedras, Departamento de Canelones UY-ANEP-14467-CW-RFB ESC SAN JOSE 2017 / Single Stage - One 2017-09- 2017-09- 2017-10- 2017-10- 2018-01- 2019-01- Refacción y Rehabilitación IBRD / 86750 Early Education Post Request for Bids Open - National 2,000,000.00 0.00 Canceled Envelope 01 05 06 16 24 19 Escuela - Departamento de San Jose UY-ANEP-71639-CW-RFB- ESC 117 MDEO / Obra nueva y Single Stage - One 1,344,266.8 2018-08- 2018-07- 2018-08- 2018-09- 2018-09- 2018-09- 2018-09- 2018-12- 2019-02- 2019-09- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed refacción Escuela N°117 de Envelope 4 01 30 01 06 06 16 18 21 01 16 Montevideo UY-ANEP-71670-CW-RFB- ESC 65 MEDEO / Ampliación y Single Stage - One 2018-08- 2018-08- 2018-09- 2018-09- 2018-12- 2019-07- IBRD / 86750 Early Education Post Request for Bids Open - National 900,000.00 0.00 Canceled Refacción Escuela 65 Envelope 15 15 20 30 28 28 Montevideo UY-ANEP-88457-CW-RFQ- OBRA ESC 35 BUCEO / Reforma de dos baños, realización accesos discapacitados, Request for Single Stage - One 2019-01- 2019-03- 2019-06- 2019-05- IBRD / 86750 Early Education Post Open - National 180,000.00 205,377.85 Signed reforma integral de Quotations Envelope 07 06 20 31 instalación eléctrica, realización de instalación de gas para conectar gas natural, pintura interior de escuela, reparaciones varias instalación sanitaria. UY-ANEP-96774-CW-RFQ- ESC105-LACAZE 2019 / Request for Single Stage - One 2019-02- 2019-03- 2019-06- 2019-05- IBRD / 86750 Early Education Post Open - National 100,000.00 153,394.79 Signed Ampliacion y reforma Esc. 105 Quotations Envelope 14 25 12 04 Juan Lacaze, Colonia UY-ANEP-99825-CW-RFB- ESC 184 MDEO 2019 / Reforma y ampliación de dos Single Stage - One 2019-02- 2019-03- 2019-04- 2019-04- 2019-07- 2020-02- IBRD / 86750 Early Education Post Request for Bids Open - National 350,000.00 0.00 Canceled aulas nuevas, SSHH y espacios Envelope 28 04 03 10 10 09 exteriores en Escuela N° 184 Barrio Lavalleja, Montevideo Page 1 UY-ANEP-99829-CW-RFB- ESC 326 MDEO 2019 / Reforma y ampliación de aulas Single Stage - One 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2020-11- IBRD / 86750 Early Education Post Request for Bids Open - National 350,000.00 0.00 Canceled SSHH, dirección y sala de Envelope 27 01 31 07 06 06 maestros en Escuela N° 326 Nuevo Ellauri, Montevideo UY-ANEP-99838-CW-RFQ- ESC 111SORIANO 2019 / Rehabilitación general de la Request for Single Stage - One 2019-02- 2019-04- 2019-08- IBRD / 86750 Early Education Post Open - National 95,000.00 0.00 Canceled eléctrica y Refacción cocina de Quotations Envelope 27 23 23 la Escuela N° 111 Mercedes, Soriano. UY-ANEP-99840-CW-RFQ- ESC 44 MALDON 2019 / Reforma y ampliación cocina, Request for Single Stage - One 2019-02- 2019-04- 2019-09- IBRD / 86750 Early Education Post Open - National 55,000.00 0.00 Canceled SSHH y espacios exteriores en Quotations Envelope 26 22 23 Escuela N° 44 Rincón de Olivera, Maldonado UY-ANEP-99843-CW-RFQ- ESC 60 MDEO 2019 / Rehabilitación SSHH de Request for Single Stage - One 2019-02- 2019-04- 2019-09- 2019-08- preescolares e IBRD / 86750 Early Education Post Open - National 100,000.00 146,751.51 Signed Quotations Envelope 18 10 02 12 impermeabilización general de azoteas en Escuela N° 60 Solferino, Montevideo UY-ANEP-99844-CW-RFQ- ESC 267 MDEO 2019 / Reforma y rehabilitación de Request for Single Stage - One 2019-02- 2019-04- 2019-08- IBRD / 86750 Early Education Post Open - National 180,000.00 0.00 Canceled cocina, comedor, SSHH y aulas Quotations Envelope 25 17 19 en Escuela N° 267 Euskalerría, Montevideo UY-ANEP-99845-CW-RFQ- ESC 35 DURAZNO 2019 / Impermeabilización de Request for Single Stage - One 2019-03- 2019-05- 2019-08- IBRD / 86750 Early Education Post Open - National 65,000.00 0.00 Canceled azotea, cambio de pisos y Quotations Envelope 08 03 05 sellado de aberturas en Escuela N°35 Sandú, Durazno. UY-ANEP-99842-CW-RFB- ESC 2 RIONEGRO 2019 / Reforma y ampliación dos Single Stage - One 2019-04- 2019-05- 2019-06- 2019-06- 2019-09- 2020-02- aulas nuevas, cocina, IBRD / 86750 Early Education Post Request for Bids Open - National 650,000.00 0.00 Canceled Envelope 29 03 02 09 08 10 comedor, SSHH y espacios exteriores en Escuela N° 2 Río Negro, Fray Bentos UY-ANEP-99834-CW-RFB- ESC 6 TACREMBO 2019 / Reforma y ampliación de aulas nuevas, dirección, sala de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-09- 2019-12- 2020-06- IBRD / 86750 Early Education Post Request for Bids Open - National 900,000.00 0.00 Canceled maestros y espacios Envelope 30 03 02 09 09 10 exteriores en Escuela N° 6 Ciudad de Tacuarembó Departamento de Tacuarembó UY-ANEP-105805-CW-RFB- OBRA IFS 2019 / Obra de reforma y adecuación local existente para IFS : 2 aulas magnas para 100 personas Single Stage - One 1,188,073.1 2019-03- 2019-05- 2019-03- 2019-04- 2019-06- 2019-04- 2019-07- 2019-07- 2019-11- 2020-01- IBRD / 86750 Early Education Post Request for Bids Open - National 1,750,000.00 Signed c/u, administración, Envelope 1 13 17 25 25 28 29 19 29 20 25 Dirección, Coordinación operativa, Secretaría, 8 oficinas, Comedor, Bibliteca, SSHH a nuevo. UY-ANEP-107930-CW-RFB- 142-MONTEVIDEO / Reforma Single Stage - One 1,397,846.3 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-06- 2019-08- 2019-09- 2020-06- IBRD / 86750 Early Education Post Request for Bids Open - National 1,800,000.00 Signed y Ampliación, cocina, Envelope 9 27 23 01 02 24 12 10 09 12 08 comedor, SSHH y aulas UY-ANEP-118368-CW-RFB- ESC 184 MDEO 2019 / Obra nueva, refacción y ampliación Single Stage - One 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-08- 2019-11- 2019-11- 2020-08- IBRD / 86750 Early Education Post Request for Bids Open - National 451,000.00 672,961.02 Signed en la Escuela N° 184 Barrio Envelope 28 20 28 29 24 05 08 04 20 30 Lavalleja, Departamento de Montevideo UY-ANEP-119213-CW-RFQ- ESC 20 MDEO 2019 / Obras Request for Single Stage - One 2019-07- 2019-09- 2019-09- 2019-11- IBRD / 86750 Early Education Post Open - National 140,000.00 152,424.60 Signed de ampliación de la cocina de Quotations Envelope 15 12 30 11 la Escuela N° 20 Montevideo UY-ANEP-121366-CW-RFQ- ESC 117 SAN RAMON / Re- adecuación baños existentes, Request for Single Stage - One 2019-07- 2019-09- 2019-11- 2019-11- construcción baños nuevos IBRD / 86750 Early Education Post Open - National 80,000.00 77,872.23 Signed Quotations Envelope 15 13 13 12 para Educación Inicial, acondicionamiento del sistema de saneamiento UY-ANEP-99836-CW-RFB- ESC 124 TMBO 2019 / Reforma cocina, comedor, Single Stage - One 1,253,596.2 2019-07- 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2019-09- 2019-12- 2020-02- 2020-06- aulas y espacios exteriores en IBRD / 86750 Early Education Post Request for Bids Open - National 1,200,000.00 Signed Envelope 4 29 05 02 01 04 08 30 08 14 09 Escuela N° 124 Ciudad de Tacuarembó, Departamento de Tacuarembó UY-ANEP-99811-CW-RFB- ESC 65 MDEO 2019 / Reforma y ampliación de aulas, SSHH y Single Stage - One 1,243,966.4 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2019-10- 2020-01- 2020-02- 2020-11- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed espacios exteriores en Escuela Envelope 4 18 26 23 22 26 04 14 10 14 06 N° 65 Ciudad Vieja Montevideo UY-ANEP-128557-CW-RFQ- 111 SORIANO 2019 / Ampliación, reforma, Request for Single Stage - One 2019-08- 2019-10- 2020-02- 2020-01- acondicionamiento sanitario y IBRD / 86750 Early Education Post Open - National 130,000.00 222,747.32 Signed Quotations Envelope 30 22 10 20 eléctrico en Escuela N° 111 Mercedes, Departamento de Soriano UY-ANEP-151242-CW-DIR- ESC CHINA 201 / Trabajos exigidos por la Intendencia Municipal de Montevideo 2020-01- 2019-12- 2020-01- 2019-12- 2020-02- 2020-02- 2020-04- referidos a la extensión del IBRD / 86750 Early Education Post Direct Selection Direct 110,000.00 117,003.22 Signed 22 18 29 16 14 13 14 colector existente en la obra Escuela nueva de Tiempo Completo N° 304 República Popular de China. UY-ANEP-156549-CW-RFQ- ESC 4 MONTEVIDEO / Reforma Request for Single Stage - One 2020-02- 2020-04- 2020-06- 2020-05- batería de baños y sector IBRD / 86750 Early Education Post Open - National 110,000.00 76,735.23 Signed Quotations Envelope 06 03 01 22 Administración en Escuela N° 4 de Montevideo. UY-ANEP-99819-CW-RFB- ESC 98 SORIANO 2019 / Obra Single Stage - One 1,713,090.4 2019-05- 2020-05- 2019-06- 2019-07- 2020-07- 2019-07- 2020-08- 2019-10- 2021-03- 2020-10- IBRD / 86750 Early Education Post Request for Bids Open - National 1,200,000.00 Signed nueva Escuela N° 98 Envelope 7 29 20 03 03 02 10 05 09 15 09 Mercedes, Soriano UY-ANEP-157310-CW-RFB- ESC 267 MDEO 2020 / Obra Single Stage - One 2020-04- 2020-07- 2020-04- 2020-05- 2020-08- 2020-05- 2020-09- 2020-08- 2021-04- 2021-04- rehabilitación en Escuela 267 IBRD / 86750 Early Education Post Request for Bids Open - National 800,000.00 545,514.43 Signed Envelope 02 24 06 06 28 13 22 12 15 12 Barrio Malvín Norte Departamento de Montevideo UY-ANEP-185650-CW-RFB- 5 RIO BRANCO 2020 / Rehabilitación y acondicionamiento local Single Stage - One 2020-07- 2020-08- 2020-09- 2020-09- 2020-12- 2021-04- IBRD / 86750 Early Education Post Request for Bids Open - National 250,000.00 0.00 Canceled escolar Escuela 5 de Río Envelope 31 04 03 10 10 12 Branco, incluye re ubicación cocina, reforma baños, adecuación aulas. UY-ANEP-157309-CW-RFQ- Under ESC 5 FLORIDA 2020 / Obra Request for Single Stage - One 2021-04- 2021-06- 2021-09- IBRD / 86750 Early Education Post Open - National 105,000.00 0.00 Implementat de Rehabilitación en Escuela 5 Quotations Envelope 01 25 23 ion Florida, Departamento Florida Page 2 UY-ANEP-157313-CW-RFB- ESC 320 MDEO 2020 / Obra Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-12- 2021-08- IBRD / 86750 Early Education Post Request for Bids Open - National 800,000.00 0.00 Canceled de rehabilitación en Escuela Envelope 03 07 06 13 13 13 N° 320 Casavalle, Montevideo UY-ANEP-99822-CW-RFB- ESC 129 MDEO 2019 / Obra Single Stage - One 2019-04- 2019-05- 2019-06- 2019-06- 2019-09- 2020-04- de ampliación y refacción en IBRD / 86750 Early Education Post Request for Bids Open - National 1,100,000.00 0.00 Canceled Envelope 29 03 02 09 08 09 Escuela N° 129 Hipódromo, Montevideo UY-ANEP-157311-CW-RFB- ESC301 MARIND 2020 / Obra Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-12- 2021-09- de ampliación en Escuela N° IBRD / 86750 Early Education Post Request for Bids Open - National 1,100,000.00 0.00 Canceled Envelope 03 07 06 13 13 13 301 Marindia, Departamento Canelones UY-ANEP-157306-CW-RFB- ESC 9 LA TEJA 2020 / Obra de Pending Single Stage - One 2021-04- 2021-04- 2021-05- 2021-05- 2021-08- 2022-05- rehabilitación en Escuela 9 La IBRD / 86750 Early Education Post Request for Bids Open - National 1,300,000.00 0.00 Implementat Envelope 02 06 06 13 06 25 Teja, Departamento de ion Montevideo UY-ANEP-218440-CW-RFB- ESC 4 MONTEVIDEO / Pending Rehabilitación general del Single Stage - One 2021-03- 2021-04- 2021-05- 2021-05- 2021-08- 2022-02- IBRD / 86750 Early Education Post Request for Bids Open - National 466,000.00 0.00 Implementat edificio, ampliación comedor, Envelope 31 05 05 12 31 28 ion reforma cocina y sshh y acceso para discapacitados. UY-ANEP-218438-CW-RFB- ESC 131 MONTEVIDEO / Pending Single Stage - One 2021-03- 2021-03- 2021-04- 2021-04- 2021-08- 2022-05- Ampliación dos aulas, IBRD / 86750 Early Education Post Request for Bids Open - National 698,000.00 0.00 Implementat Envelope 01 06 05 12 01 28 rehabilitación general y ion acondicionamiento de patio UY-ANEP-234351-CW-RFQ Request for Pending ESC. 4 DE ROCHA / Request for Single Stage - One 2021-06- 2021-07- 2021-12- IBRD / 86750 Early Education Post Open - National Quotations (Non 220,000.00 0.00 Implementat Ampliación. Un aula, mas Quotations Envelope 06 30 31 Bank-SPD) ion comedor y cocina. UY-ANEP-234355-CW-RFQ ESC. 63 LAVALLEJA / Request for Under Request for Single Stage - One 2021-06- 2021-07- 2021-12- Ampliación. Dentro de la IBRD / 86750 Early Education Post Open - National Quotations (Non 220,000.00 0.00 Implementat Quotations Envelope 06 30 29 construcción existente, en el Bank-SPD) ion área de comedor y cocina. UY-ANEP-234354-CW-RFQ ESC. 36 DE ARTIGAS / Request for Pending Request for Single Stage - One 2021-06- 2021-07- 2021-12- Ampliación. Dentro de la IBRD / 86750 Early Education Post Open - National Quotations (Non 220,000.00 0.00 Implementat Quotations Envelope 06 31 17 construcción existente en el Bank-SPD) ion área de comedor y cocina. GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents as Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UY-ANEP-14475-GO-RFQ Request for Single Stage - One 2017-08- 2017-09- 2017-09- 2017-11- CORTINAS 2017 / Cortinas, IBRD / 86750 Primary Education Post Open - National 8,800.00 16,976.28 Signed Quotations Envelope 23 15 18 01 Alfombras y colchonetas UY-ANEP-14485-GO-RFQ FOTOCOPIAS 2017 / 80.000 Request for Single Stage - One 2017-03- 2017-03- 2017-03- 2017-12- IBRD / 86750 Primary Education Post Open - National 1,220.00 1,081.87 Signed Fotocopias para Formación en Quotations Envelope 16 29 29 31 Servicio año 2017 UY-ANEP-14488-GO-RFQ ESCURRIDORES 2017 / 30 Request for Single Stage - One 2017-05- 2017-06- 2017-05- 2017-07- IBRD / 86750 Primary Education Post Open - National 24,000.00 630.86 Signed escurridores de acero Quotations Envelope 17 02 29 05 inoxidable UY-ANEP-14573-GO-RFQ- COL ANDARIEGA 2017 / 21 Request for Single Stage - One 2017-05- 2017-05- 2017-10- 2017-06- IBRD / 86750 Primary Education Post Open - National 30,000.00 10,186.37 Signed Bibliotecas y carros para Quotations Envelope 17 31 02 14 almohadones UY-ANEP-14717-GO-RFQ- LIBROS TECNICO 2017 / Libros Técnicos para los Request for Single Stage - One 2017-05- 2017-06- 2017-03- 2017-08- IBRD / 86750 Primary Education Post Open - National 3,500.00 1,571.18 Signed Equipos de Cultura Quotations Envelope 22 15 30 14 Institucional, Matemáticas y Ciencias Sociales UY-ANEP-14476-GO-RFB EQ Single Stage - One 2017-07- 2017-08- 2017-07- 2017-08- 2017-09- 2017-08- 2017-09- 2017-09- 2017-12- 2017-11- SEMI IND 2017 / IBRD / 86750 Primary Education Post Request for Bids Open - National 230,000.00 250,222.00 Signed Envelope 07 01 12 14 01 24 26 04 06 15 Equipamiento Semi Industrial UY-ANEP-14481-GO-RFB MOB DIRECCION 2017 / Single Stage - One 2017-07- 2017-08- 2017-07- 2017-08- 2017-09- 2017-08- 2017-09- 2017-09- 2017-12- 2017-11- IBRD / 86750 Primary Education Post Request for Bids Open - National 100,000.00 115,457.79 Signed Mobiliario Dirección y Sala de Envelope 03 01 08 07 01 17 26 18 04 15 Maestros ETC UY-ANEP-14479-GO-RFB Single Stage - One 2017-05- 2017-06- 2017-05- 2017-06- 2017-07- 2017-07- 2017-07- 2017-10- 2017-11- 2018-01- MOB ESCOLAR 2017 / IBRD / 86750 Primary Education Post Request for Bids Open - National 550,000.00 608,157.10 Signed Envelope 17 01 26 26 03 06 21 16 29 14 Mobiliario Escolar UY-ANEP-14483-GO-RFB Single Stage - One 2017-02- 2017-02- 2017-02- 2017-03- 2017-03- 2017-04- 2017-04- 2017-07- 2017-06- 2017-08- VAJILLA 2017 / Vajila y IBRD / 86750 Early Education Post Request for Bids Open - National 100,000.00 72,641.23 Signed Envelope 09 09 09 13 13 03 03 13 30 27 Utensilios para cocina UY-ANEP-14477-GO-RFB EQ Single Stage - One 2017-07- 2017-10- 2017-07- 2017-08- 2017-10- 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- INFORM 2017 / Equipamiento IBRD / 86750 Primary Education Post Request for Bids Open - National 60,000.00 42,308.80 Signed Envelope 18 27 23 23 27 04 14 05 22 31 Informático UY-ANEP-14804-GO-RFB- PLATOS ETC 2017 / Platos Single Stage - One 2017-05- 2017-06- 2017-05- 2017-06- 2017-07- 2017-06- 2017-07- 2017-07- 2017-09- 2017-10- IBRD / 86750 Early Education Post Request for Bids Open - National 96,000.00 74,233.28 Signed hondos 15.000 y Platos llanos Envelope 12 13 15 14 13 19 24 03 06 02 8.000 para ETC UY-ANEP-17152-GO-RFQ / Material fotocopiado en formato de libro para Request for Single Stage - One 2017-06- 2017-07- 2017-06- 2018-01- capacitación ETC que se IBRD / 86750 Primary Education Post Open - National 1,500.00 1,550.01 Signed Quotations Envelope 19 03 27 07 entregan mensualmente a Formadores de junio a diciembre (15 por mes) UY-ANEP-17783-GO-RFQ- LIBROS-COL-ANDARIEG / Request for Single Stage - One 2017-06- 2017-07- 2017-07- 2017-08- IBRD / 86750 Early Education Post Open - National 42,000.00 32,331.15 Signed LIBROS PARA LA COLECCIÓN Quotations Envelope 24 14 06 14 ANDARIEGA (DLI) UY-ANEP-14480-GO-RFQ EQ Request for Single Stage - One 2017-07- 2017-08- 2017-09- 2017-10- AUDIOVISUAL 2017 / IBRD / 86750 Primary Education Post Open - National 23,000.00 23,423.50 Signed Quotations Envelope 24 16 05 16 Equipamiento Audiovisual UY-ANEP-30193-GO-DIR- LIBROS COL ANDARIEG / CD. 2017-09- 2017-09- 2017-10- 2017-10- IBRD / 86750 Early Education Post Direct Selection Direct 3,800.00 0.00 Canceled LIBROS COLECCIÓN 26 29 04 20 ANDARIEGA UY-ANEP-31180-GO-RFQ LIBROS II / Complemento Request for Single Stage - One 2017-10- 2017-10- 2017-10- 2017-11- IBRD / 86750 Early Education Post Open - National 3,800.00 3,084.72 Signed Libros de la Colección Quotations Envelope 12 20 20 30 "Andariega" (DLI) UY-ANEP-31207-GO-RFQ- PROYECTOR Y OTROS / Request for Single Stage - One 2017-10- 2017-11- 2017-11- 2017-12- IBRD / 86750 Primary Education Post Open - National 15,000.00 27,109.60 Signed Proyectores y pantallas para Quotations Envelope 16 07 28 08 Escuelas de Tiempo Completo UY-ANEP-36028-GO-DIR / 2017-11- 2017-11- 2017-11- 2017-12- Adquisición 20 Bibliotecas IBRD / 86750 Primary Education Prior Direct Selection Direct 12,000.00 0.00 Canceled 08 13 13 15 Andariegas Page 3 UY-ANEP-37562-GO-RFQ- CERTIFICADOS / Certificados Request for Single Stage - One 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- IBRD / 86750 Primary Education Post Open - National 2,000.00 985.66 Completed a entregar a Docentes Fines Quotations Envelope 24 30 01 05 08 de Cursos 2018 UY-ANEP-37564-GO-RFQ- LIBROS ANDARI 2018 / Libros Request for Single Stage - One 2017-11- 2017-12- 2017-12- 2018-02- Colección Andariega para IBRD / 86750 Early Education Post Open - National 42,000.00 34,662.17 Signed Quotations Envelope 24 12 07 15 2018 - 100 títulos con 20 ejemplares de cada uno. UY-ANEP-39537-GO-RFQ- FOTOCOPIAS DIC-JUL / 200.000 Fotocopias para los Request for Single Stage - One 2017-12- 2017-12- 2018-01- 2018-07- IBRD / 86750 Primary Education Post Open - National 8,300.00 3,168.33 Signed cursos de capacitación Quotations Envelope 13 21 04 31 docente desde diciembre 2017 a julio 2018 UY-ANEP-39545-GO-RFQ- MATERIAL E IMPRESOS / Request for Single Stage - One 2018-01- 2018-02- 2018-10- 2018-12- Materiales e impresiones IBRD / 86750 Primary Education Post Open - National 45,000.00 222.96 Signed Quotations Envelope 22 23 30 31 Formación en Servicio de Febrero a Diciembre 2018 UY-ANEP-39591-GO-RFB-EQ Single Stage - One 2018-08- 2018-08- 2018-09- 2018-09- 2018-11- 2018-12- SEMI IND 2018 / IBRD / 86750 Primary Education Post Request for Bids Open - National 192,000.00 0.00 Canceled Envelope 01 01 03 21 08 23 Electrodomésticos Industriales UY-ANEP-39594-GO-RFB- Single Stage - One 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-04- 2018-05- 2018-05- VAJILLA ALUM 2018 / Vajilla y IBRD / 86750 Early Education Post Request for Bids Open - National 150,000.00 152,430.84 Signed Envelope 09 24 12 13 23 28 12 16 07 31 Aluminio para ETC 2018 UY-ANEP-39598-GO-RFQ- ELECTROD 2018 / Request for Single Stage - One 2018-01- 2018-02- 2018-01- 2018-04- IBRD / 86750 Primary Education Post Open - National 43,000.00 39,963.78 Signed Electrodomésticos (heladeras Quotations Envelope 12 09 25 10 y freezer) 2018 para ETC UY-ANEP-41033-GO-RFQ- BIBLIOG FORM INICIA / Request for Single Stage - One 2018-01- 2018-01- 2018-01- 2018-02- Biografiara para Formadores IBRD / 86750 Early Education Post Open - National 1,000.00 1,191.17 Signed Quotations Envelope 08 22 19 08 de Educación Inicial - 27 Títulos UY-ANEP-63176-GO-RFQ- LIB ANDAR COMP 2018 / Request for Single Stage - One 2018-05- 2018-06- 2018-06- 2018-07- Complemento de títulos IBRD / 86750 Early Education Post Open - National 12,000.00 1,920.34 Signed Quotations Envelope 25 08 07 09 Colección Andariega (DLI) para 2018 UY-ANEP-63182-GO-RFB- CARROS COL AND 2018 / Single Stage - One 2018-05- 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2018-08- 2018-11- Adquisición de bibliotecas y IBRD / 86750 Primary Education Post Request for Bids Open - National 55,000.00 935,008.00 Signed Envelope 25 24 29 28 26 06 05 17 22 30 carros para colección andariega UY-ANEP-68136-GO-DIR- LIBROS C-A- 2018 / 2018-06- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- Complemento 9 Libros para IBRD / 86750 Early Education Post Direct Selection Direct 2,000.00 1,001.69 Signed 27 27 30 19 05 25 21 Biblioteca Colección Andariega UY-ANEP-79041-GO-RFQ- LIBROS COL AND 2019 / Libros para la Colección de Request for Single Stage - One 2018-10- 2018-10- 2018-06- 2019-02- IBRD / 86750 Early Education Post Open - National 40,000.00 1,654.17 Signed Carros Andariegos de Quotations Envelope 01 31 07 15 Educación Inicial a entregarse en febrero 2019 UY-ANEP-80467-GO-RFQ- Request for Single Stage - One 2018-10- 2018-11- 2018-12- 2018-12- ANAFES 2018 / 20 Anafes dos IBRD / 86750 Primary Education Post Open - National 26,000.00 25,620.00 Signed Quotations Envelope 10 06 13 21 fuegos a gas UY-ANEP-81645-GO-RFQ- ELECTROD-2018 / Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-12- 2019-02- Electrodomésticos semi IBRD / 86750 Primary Education Post Open - National 46,500.00 36,743.00 Completed Quotations Envelope 19 09 09 24 15 industrial (licuadoras- batidoras y procesadoras) UY-ANEP-88454-GO-RFQ- COMP LIBROS 2019 / Complemento Libros Colección Andariega 2019. Request for Single Stage - One 2018-12- 2018-12- 2018-12- 2019-02- IBRD / 86750 Early Education Post Open - National 18,000.00 5,866.14 Signed Títulos que quedaron Quotations Envelope 04 20 19 15 desiertos y nuevos títulos que complementan colecciones anteriores UY-ANEP-99854-GO-RFB- Single Stage - One 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-07- 2019-08- 2019-08- VAJILLA 2019 / Vajilla y IBRD / 86750 Early Education Post Request for Bids Open - National 98,000.00 77,280.72 Signed Envelope 20 19 20 19 23 02 28 03 08 17 06 utensilios de cocina UY-ANEP-99855-GO-RFB- MOB DIRECCION 2019 / Mobiliario de Dirección y Sala Single Stage - One 2019-06- 2019-10- 2019-06- 2019-07- 2019-10- 2019-07- 2019-11- 2019-08- 2019-12- 2019-11- IBRD / 86750 Early Education Post Request for Bids Open - National 65,000.00 63,027.64 Signed de Maestros (escritorios, Envelope 01 25 09 09 25 22 13 21 26 04 mesas, sillas, cajoneras, bibliotecas, etc) UY-ANEP-100302-GO-RFQ- MAT IMPRESOS 2019 / Materiales y Fotocopias del Request for Single Stage - One 2019-03- 2019-03- 2019-04- 2019-12- IBRD / 86750 Primary Education Post Open - National 24,000.00 1,599.10 Signed Componente Formación en Quotations Envelope 04 29 30 31 Servicio de Abril a Diciembre 2019 UY-ANEP-100308-GO-RFQ- PUBLICACIONES 2019 / Publicaciones para el Request for Single Stage - One 2019-03- 2019-03- 2019-12- IBRD / 86750 Primary Education Post Open - National 22,000.00 0.00 Canceled Componente Formación en Quotations Envelope 04 29 31 Servicio a realizarse entre ABRIL y DICIEMBRE 2019 UY-ANEP-99061-GO-DIR- COMP-LBROS 2019 / Libro 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- para la Colección Andariega IBRD / 86750 Early Education Post Direct Selection Direct 400.00 377.56 Signed 05 12 08 20 11 22 28 2019 - Cantidad 23 del mismo titulo. UY-ANEP-99851-GO-RFB- MOBILIARIO ESC 2019 / Mobiliario Escolar, mesas, sillas y bancos para salas de Single Stage - One 2019-02- 2019-03- 2019-02- 2019-03- 2019-04- 2019-04- 2019-05- 2019-07- 2019-10- 2019-10- IBRD / 86750 Early Education Post Request for Bids Open - National 620,000.00 450,504.00 Signed preescolares, escolares y Envelope 14 11 22 24 12 06 20 05 29 03 comedor. Total de aulas: Ed. Inicial 3, 4 y 5 años: 67, 1° a 3°: 75 y 4° a 6° 77 UY-ANEP-99852-GO-RFB- EQUIP SEMI IND 2019 / Equipamiento Semi Industrial: Single Stage - One 2019-03- 2019-05- 2019-03- 2019-04- 2019-06- 2019-04- 2019-06- 2019-05- 2019-08- 2019-08- 2019-10- 10 Anafes 1 fuego, 35 IBRD / 86750 Early Education Post Request for Bids Open - National 250,000.00 188,795.00 Completed Envelope 06 03 14 13 06 26 21 26 15 09 14 Cocinas con horno, 10 Horno Eléctrico con base y 30 Anafes 2 fuegos. UY-ANEP-109107-GO-RFQ- ESCURRIDORES 2019 / Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-06- Compra de 40 escurridores IBRD / 86750 Primary Education Post Open - National 26,600.00 19,520.00 Signed Quotations Envelope 29 26 20 25 industriales para cocina de las Escuelas de Tiempo Completo UY-ANEP-118343-GO-RFQ- CARROS ANDAR 2019 / Request for Single Stage - One 2019-06- 2019-07- 2019-07- 2019-09- Adquisición de 26 Bibliotecas IBRD / 86750 Primary Education Post Open - National 17,000.00 19,844.95 Signed Quotations Envelope 17 24 17 22 y 25 carros para Colección Andariega- año 2020 UY-ANEP-99849-GO-RFB- ELECTROD 2019 / Heladeras, Single Stage - One 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- IBRD / 86750 Early Education Post Request for Bids Open - National 150,000.00 132,771.80 Signed freezer y electrodomésticos Envelope 28 29 29 28 30 11 14 17 25 27 industriales Page 4 UY-ANEP-141781-GO-RFQ- LIBROS ANDAR 2019 / 2.300 Libros de Colección Andariega Request for Single Stage - One 2019-10- 2019-12- 2019-11- 2020-02- para armar 23 Bibliotecas con IBRD / 86750 Early Education Post Open - National 44,000.00 31,167.17 Signed Quotations Envelope 30 06 21 28 100 títulos cada una a entregar en Escuelas de Tiempo Completo 2020 UY-ANEP-141818-NC-RFQ- CAJAS LIBROS 2020 / 60 Cajas multiuso en PVC con tapa Request for Single Stage - One 2019-10- 2019-11- 2019-11- 2019-11- IBRD / 86750 Early Education Post Open - National 500.00 333.68 Signed para guardar y transportar Quotations Envelope 28 07 22 22 los libros de la colección Andariega UY-ANEP-143901-GO-DIR- BIBLIOTECAS 2017 / 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-11- 2017-12- IBRD / 86750 Primary Education Post Direct Selection Direct 12,000.00 7,666.93 Signed Adquisición 20 Bibliotecas 08 31 13 22 13 22 15 Andariegas UY-ANEP-141808-NC-RFQ- ETIQ LIBROS 2020 / Planchas de etiquetas auto adhesivas que poseen un número de Request for Single Stage - One 2019-10- 2019-11- 2019-11- IBRD / 86750 Early Education Post Open - National 1,800.00 0.00 Canceled referencia, para colocar en los Quotations Envelope 28 07 22 libros de la colección andariega, a distribuir en la ETC UY-ANEP-99847-GO-RFQ- ALFOMBRAS 2019 / Alfombras Request for Single Stage - One 2019-03- 2019-04- 2019-06- IBRD / 86750 Primary Education Post Open - National 17,000.00 0.00 Canceled y colchonetas para Educación Quotations Envelope 07 29 15 Inicial UY-ANEP-99848-GO-RFQ- EQ AUDIOVISUAL 2019 / Request for Single Stage - One 2019-05- 2019-06- 2019-08- Combo parlantes activos, IBRD / 86750 Primary Education Post Open - National 16,500.00 0.00 Canceled Quotations Envelope 07 09 15 radiograbadores y equipamiento audiovisual UY-ANEP-156960-GO-RFB- MOB ESCOLAR 2020 / Under Single Stage - One 2020-04- 2021-02- 2020-04- 2020-05- 2021-03- 2020-05- 2021-04- 2020-08- 2020-12- Mobiliario Escolar e inicial IBRD / 86750 Early Education Post Request for Bids Open - National 700,000.00 0.00 Implementati Envelope 02 25 03 04 25 15 27 20 18 para 23 Escuelas de Tiempo on Completo UY-ANEP-156964-GO-RFB- Single Stage - One 2020-04- 2020-04- 2020-04- 2020-05- 2020-05- 2020-05- 2020-06- 2020-06- 2020-08- 2020-09- VAJILLA 2020 / Vajilla y IBRD / 86750 Early Education Post Request for Bids Open - National 145,000.00 90,448.20 Signed Envelope 02 21 02 04 25 20 03 26 03 24 Aluminio para ETC UY-ANEP-156969-GO-RFB- MOB MAESTROS 2020 / Single Stage - One 2020-05- 2020-08- 2020-05- 2020-06- 2020-09- 2020-06- 2020-12- 2020-07- 2021-01- 2020-10- IBRD / 86750 Early Education Post Request for Bids Open - National 190,000.00 53,794.00 Signed Mobiliario de Dirección y Sala Envelope 04 26 05 04 25 15 23 24 13 22 de Maestros de ETC UY-ANEP-156972-GO-RFB- ELECTRODOM 2020 / Single Stage - One 2020-06- 2020-08- 2020-06- 2020-07- 2020-09- 2020-07- 2020-09- 2020-10- 2020-12- 2020-12- IBRD / 86750 Early Education Post Request for Bids Open - National 370,000.00 191,601.00 Signed Electrodomésticos industriales Envelope 15 04 16 16 04 29 15 27 17 27 para ETC UY-ANEP-157785-GO-RFQ- FOTOCOPIAS 2020 / Fotocopias de material a entregar en los encuentros Monitoring and Evaluation Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-12- IBRD / 86750 Post Open - National 6,000.00 5,431.00 Signed docentes en el año 2020. System Quotations Envelope 10 25 27 30 Cantidad estimada 195.000 fotocopias en blanco y negro y 5.000 a color UY-ANEP-157786-GO-RFQ- MATER INICIAL 2020 / Monitoring and Evaluation Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-02- Materiales fungibles para IBRD / 86750 Post Open - National 500.00 57.77 Signed System Quotations Envelope 06 19 20 26 encuentros docentes de Educación Inicial 2020 UY-ANEP-166127-GO-RFQ ALF. Y COLCH 2020 / Adquisición de 800 alfombras Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-06- IBRD / 86750 Early Education Post Open - National 12,000.00 10,882.40 Signed de goma eva y 700 Quotations Envelope 01 30 30 15 colchonetas para aulas de Educación inicial de ETC UY-ANEP-156958-GO-RFQ- RADIOGRAB 2020 / Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-06- 2020-05- IBRD / 86750 Early Education Post Open - National 30,000.00 10,399.28 Completed Radiograbadores y Kit de Quotations Envelope 01 24 27 24 02 audio para ETC UY-ANEP-189888-GO-RFQ- KIT AUDIO 2020 / 30 Combos Request for Single Stage - One 2020-08- 2020-09- 2020-10- 2020-12- Parlantes activos, micrófonos, IBRD / 86750 Early Education Post Open - National 25,000.00 19,650.00 Signed Quotations Envelope 28 25 20 24 trípodes y jirafas para Escuelas de Tiempo Completo UY-ANEP-156952-GO-RFQ- CORTINAS,ALF. 2020 / Request for Single Stage - One 2020-02- 2020-03- 2020-05- IBRD / 86750 Early Education Post Open - National 7,500.00 0.00 Canceled Cortinas, alfombras y Quotations Envelope 20 17 04 colchonetas para ETC UY-ANEP-156955-GO-RFQ- EQ AUDIOVISUA 2020 / Request for Single Stage - One 2020-02- 2020-03- 2020-05- IBRD / 86750 Early Education Post Open - National 9,000.00 0.00 Canceled Equipamiento Audiovisual Quotations Envelope 17 11 11 para ETC - Amplificadores UY-ANEP-193322-GO-RFQ- CARROS ANDAR 2020 / Request for Single Stage - One 2020-09- 2020-11- 2020-11- 2021-01- Adquisiciones de 16 IBRD / 86750 Primary Education Post Open - National 12,000.00 11,910.48 Signed Quotations Envelope 23 20 18 19 Bibliotecas y 16 carros para la Colección Andariega 2020 UY-ANEP-199051-GO-RFQ- LIBROS ANDAR 2020 / 1800 Libros para la Colección Under Andariega para armar 18 Request for Single Stage - One 2020-10- 2020-12- 2021-02- IBRD / 86750 Early Education Post Open - National 42,000.00 0.00 Implementati bibliotecas con 100 títulos Quotations Envelope 14 03 26 on cada una a entregar en los niveles de Educación Inicial de ETC en el año 2021 UY-ANEP-199057-GO-RFQ- CAJAS LIBROS 2020 / 54 Cajas Multiuso en PVC con tapa para Request for Single Stage - One 2020-10- 2020-10- 2020-10- 2020-12- IBRD / 86750 Early Education Post Open - National 320.00 231.09 Signed guardar y transportar los Quotations Envelope 14 26 26 04 libros de la Colección Andariega UY-ANEP-217877-GO-RFQ- Pending VAJILLA 2021 / VAJILLA Y Request for Single Stage - One 2021-05- 2021-07- 2021-10- IBRD / 86750 Early Education Post Open - National 43,000.00 0.00 Implementati ALUMINIO PARA ESCUELAS DE Quotations Envelope 03 23 21 on TIEMPO COMPLETO UY-ANEP-218344-GO-RFQ- ELECTRODOM 2021 / Pending Request for Single Stage - One 2021-05- 2021-07- 2021-09- Electrodomésticos semi IBRD / 86750 Early Education Post Open - National 43,000.00 0.00 Implementati Quotations Envelope 03 16 14 industrial para Escuelas de on Tiempo Completo UY-ANEP-156965-GO-RFQ- HELADERAS 2020 / Heladeras Request for Single Stage - One 2020-05- 2020-06- 2020-08- IBRD / 86750 Early Education Post Open - National 44,000.00 0.00 Canceled con freezer y freezer Quotations Envelope 04 19 18 horizontal para ETC UY-ANEP-229505-GO-RFQ- LIC ZOOM EDUC 2021 / 20 Licencias de Zoom educativo Request for Single Stage - One 2021-04- 2021-05- 2021-05- 2022-05- que permitan cumplir con la IBRD / 86750 Early Education Post Open - National 2,500.00 2,196.00 Signed Quotations Envelope 26 12 03 11 planificación de los cursos de Formación en Servicio para el año 2021. NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents as Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 UY-ANEP-14561-NC-RFQ- INSPECTORES 2017 / Jornada Request for Single Stage - One 2017-05- 2017-06- 2017-05- 2017-12- IBRD / 86750 Early Education Post Open - National 28,000.00 20,436.68 Signed de Inspectores TC . 2 Quotations Envelope 15 06 29 05 jornadas/año - 115 personas UY-ANEP-14487-NC-RFQ FORMADORES 2017 / 9 Request for Single Stage - One 2017-05- 2017-06- 2017-05- 2017-12- Encuentros de Formadores de IBRD / 86750 Early Education Post Open - National 48,000.00 28,990.00 Signed Quotations Envelope 15 06 29 31 TC de junio a diciembre - 65 participantes por fecha UY-ANEP-14716-NC-RFQ- GESTION ESC NUEVAS / 2017 Request for Single Stage - One 2017-03- 2017-03- 2017-03- 2017-07- - 4 Encuentros Gestión IBRD / 86750 Early Education Post Open - National 17,906.00 16,122.38 Signed Quotations Envelope 08 24 24 15 Escuelas Nuevas de TC - 90 participantes UY-ANEP-14562-NC-RFQ- DIRECTORES 2017 / Jornada Request for Single Stage - One 2017-05- 2017-06- 2017-06- 2017-11- IBRD / 86750 Early Education Post Open - National 36,000.00 32,676.93 Signed Directores . 2 jornadas/año - Quotations Envelope 15 06 13 07 145 personas UY-ANEP-15335-NC-RFQ / Jornadas apoyo a la Request for Single Stage - One 2017-05- 2017-05- 2017-05- 2017-06- Coordinación de Tiempo IBRD / 86750 Early Education Post Open - National 10,500.00 8,576.61 Signed Quotations Envelope 17 29 30 01 Completo del CEIP - Junio 2017 UY-ANEP-17531-NC-RFQ- ALOJ SEMINARIO INT / Alojamiento para docentes del Interior que participarán en el Request for Single Stage - One 2017-06- 2017-08- 2017-07- 2017-08- IBRD / 86750 Early Education Post Open - National 12,000.00 3,247.89 Signed Seminario Internacional a Quotations Envelope 20 01 27 31 realizarse en la IMM de Educación Inicial los días 28 y 29 de agosto 2017. UY-ANEP-19221-NC-RFQ / Encuentro 14 de julio 2017 Directores de Tiempo Request for Single Stage - One 2017-07- 2017-07- 2017-07- 2017-07- Completo de Rivera, IBRD / 86750 Early Education Post Open - National 3,000.00 1,302.95 Signed Quotations Envelope 03 10 06 14 Tacuarembó, Salto y Paysandú con equipo de Cultura Institucional UY-ANEP-19230-NC-RFQ / Jornadas apoyo a la Request for Single Stage - One 2017-07- 2017-07- 2017-08- 2017-12- Coordinación de Tiempo IBRD / 86750 Early Education Post Open - National 15,000.00 16,651.49 Signed Quotations Envelope 04 18 16 31 Completo del CEIP. Agosto- Diciembre 2017 UY-ANEP-14802-NC-RFB- CONGRESO ETC 2017 / Single Stage - One 2017-06- 2017-06- 2017-07- 2017-07- 2017-07- 2017-08- IBRD / 86750 Early Education Post Request for Bids Open - National 60,000.00 0.00 Canceled Congreso de Tiempo Envelope 01 05 05 17 27 31 Completo 2017 UY-ANEP-19868-NC-RFQ / ALOJAMIENTO 35 docentes Request for Single Stage - One 2017-07- 2017-07- 2017-07- 2017-07- ETC Interior ENCUENTRO IBRD / 86750 Early Education Post Open - National 1,100.00 173.76 Signed Quotations Envelope 12 21 24 29 EDUCACIÓN INICIAL 29 JULIO 2017 UY-ANEP-23913-NC-RFQ- IMPRESOS SEMINARIO / Folletería, banners, certificados e invitaciones Request for Single Stage - One 2017-08- 2017-08- 2017-08- 2017-08- 2017-08- IBRD / 86750 Early Education Post Open - National 2,000.00 562.06 Completed para el SEMINARIO Quotations Envelope 06 15 09 25 22 INTERNACIONAL a realizarse en la IMM, el 28 y 29 de agosto 2017 UY-ANEP-27748-NC-RFQ- DIRECTORES / ESCUELAS Request for Single Stage - One 2017-09- 2017-09- 2017-09- IBRD / 86750 Early Education Post Open - National 1,500.00 0.00 Canceled NUEVAS - LOGÍSTICA PARA Quotations Envelope 14 25 30 JORNADA CON DIRECTORES UY-ANEP-29308-NC-RFQ- ETIQUETAS LIBROS / Etiquetas Request for Single Stage - One 2017-09- 2017-09- 2017-10- 2017-10- IBRD / 86750 Early Education Post Open - National 1,800.00 732.06 Signed auto adhesivas para colección Quotations Envelope 21 29 03 04 libros carros ANDARIEGOS UY-ANEP-14718-NC-RFQ- ENCUENTRO DIR 2017 / Encuentro 27 junio 2017 Request for Single Stage - One 2017-05- 2017-06- 2017-06- 2017-06- IBRD / 86750 Early Education Post Open - National 1,800.00 1,184.10 Signed Directores de Montevideo y Quotations Envelope 22 05 01 27 Canelones con equipo de Cultura Institucional UY-ANEP-34709-NC-RFQ- COFFEE JORNADA / Servicio Request for Single Stage - One 2017-11- 2017-11- 2017-11- 2017-11- de coffee break para jornada IBRD / 86750 Early Education Post Open - National 1,200.00 970.48 Signed Quotations Envelope 03 08 07 13 de Maestros de Tiempo Completo UY-ANEP-19225-NC-DIR / Sala y Coffee Break para Seminario Internacional a 2017-06- 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- IBRD / 86750 Early Education Post Direct Selection Direct 8,500.00 4,242.13 Signed realizarse en la Intendencia 27 22 27 27 10 27 29 Municipal de Montevideo el 28 y 29 agosto 2017 UY-ANEP-39581-NC-RFQ- JORNADA C-ANDARIEGA / Jornadas Colección Andariega . Logística para jornadas - Request for Single Stage - One 2018-02- 2018-03- 2018-04- 2018-11- alquiler de salones equipados, IBRD / 86750 Early Education Post Open - National 45,000.00 23,714.97 Signed Quotations Envelope 09 04 03 03 servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39566-NC-RFQ- APOYO TC DIRECTORES / Apoyo a la Inspección Nacional de Tiempo Completo Encuentro de Directores de Marzo a Diciembre 2018. Request for Single Stage - One 2018-03- 2018-03- 2018-08- 2018-12- IBRD / 86750 Early Education Post Open - National 32,000.00 15,188.32 Signed Logística para jornadas - Quotations Envelope 05 23 16 31 alquiler de salones equipados, servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39572-NC-RFQ- APOYO TC INSPECT / Apoyo a la Inspección Nacional de Tiempo Completo Encuentro de Inspectores desde marzo a Request for Single Stage - One 2018-03- 2018-03- 2018-03- 2018-12- diciembre 2018. Logística IBRD / 86750 Early Education Post Open - National 18,000.00 5,692.71 Signed Quotations Envelope 05 23 20 31 para jornadas - alquiler de salones equipados, servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39578-NC-RFQ- INSPECTORES ETC / Jornadas de Inspectores de ETC. Logística para jornadas - Request for Single Stage - One 2018-03- 2018-03- 2018-03- 2018-10- alquiler de salones equipados, IBRD / 86750 Early Education Post Open - National 15,000.00 10,612.08 Signed Quotations Envelope 02 18 20 29 servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39552-NC-RFB- FORMADORES FEB-JUL / Encuentros de Formadores ETC . Logística para jornadas Single Stage - One 2018-01- 2018-03- 2018-01- 2018-02- 2018-04- 2018-02- 2018-04- 2018-02- 2018-04- 2018-12- - alquiler de salones IBRD / 86750 Early Education Post Request for Bids Open - National 75,000.00 38,562.73 Signed Envelope 04 02 04 05 04 08 04 15 06 07 equipados, servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . Page 6 UY-ANEP-39576-NC-RFB- DIRECTORES ETC / Jornadas encuentros de Maestros Directores de ETC. Logística Single Stage - One 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- 2018-02- 2018-03- 2018-02- 2018-03- 2018-10- para jornadas - alquiler de IBRD / 86750 Early Education Post Request for Bids Open - National 65,000.00 41,494.40 Signed Envelope 17 05 17 16 08 28 12 28 13 22 salones equipados, servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39557-NC-RFB- JORNADAS ED INICIAL / Jornadas de Educación Inicial. Logística para jornadas - Single Stage - One 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-10- alquiler de salones equipados, IBRD / 86750 Early Education Post Request for Bids Open - National 90,000.00 24,124.72 Signed Envelope 12 07 12 12 23 16 27 23 01 27 servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-48227-NC-RFQ- JORNADAS CON SOUTO / Jornadas de Formadores PAEPU con experta Marta Souto, Logística para Request for Single Stage - One 2018-02- 2018-02- 2018-06- 2018-07- IBRD / 86750 Early Education Post Open - National 20,000.00 10,886.04 Signed jornadas: alquiler de salones Quotations Envelope 16 28 13 31 equipados, servicio de catering (desayuno, coffee break, almuerzos y cenas), alojamiento y transporte. UY-ANEP-52242-NC-RFQ- CURSO I 2018 / Jornadas para Maestros y Directores de ETC - CURSO 1 a realizarse en 2018. Logística para Request for Single Stage - One 2018-03- 2018-04- 2018-04- 2018-11- IBRD / 86750 Early Education Post Open - National 40,000.00 32,896.60 Signed jornadas: alquiler de salones Quotations Envelope 12 03 04 17 equipados, servicio de catering (desayuno, coffee break, almuerzos y cenas), alojamiento y transporte. UY-ANEP-58126-NC-RFQ- JORNADA 24-4-18 / JORNADA CAPACITACIÓN Request for Single Stage - One 2018-04- 2018-04- 2018-04- 2018-04- Directores y Maestros de IBRD / 86750 Early Education Post Open - National 7,000.00 5,811.64 Signed Quotations Envelope 13 19 18 24 Escuelas que participan en observación de aula a realizarse el 24 de abril 2018 UY-ANEP-63188-NC-DIR- DIRECTORE COMPL2018 / Logística para dos jornadas de 2018-05- 2018-05- 2018-05- 2018-05- 2018-06- 2018-05- 2018-07- IBRD / 86750 Early Education Post Direct Selection Direct 15,000.00 13,980.18 Signed capacitación de Directores de 17 16 22 14 22 24 31 ETC a realizarse en mayo y julio 2018 UY-ANEP-81638-NC-RFQ- ETIQUETAS 2018 / Etiquetas Request for Single Stage - One 2018-10- 2018-10- 2018-10- para libros colección IBRD / 86750 Early Education Post Open - National 1,500.00 0.00 Canceled Quotations Envelope 18 26 31 andariega a ser entregados principio 2019 UY-ANEP-45071-NC-DIR- IMPRESION CATALOGO / 2018-01- 2018-01- 2018-12- 2018-12- 2018-12- 2018-12- 2019-02- Impresión de Catálogos para IBRD / 86750 Early Education Post Direct Selection Direct 3,700.00 4,295.23 Signed 22 02 10 05 14 18 28 la Colección Andariega - IMPRENTA MASTERGRAF SRL UY-ANEP-94804-NC-RFQ- JORNADA BIRF 2019 / ENCUENTRO con EXPERTA BANCO MUNDIAL Request for Single Stage - One 2019-01- 2019-01- 2019-01- 2019-02- Alojamientos para Directores IBRD / 86750 Early Education Post Open - National 1,200.00 580.52 Signed Quotations Envelope 21 25 22 12 y Maestros de TC que participarán en la Jornada con Experta enviada por el Banco Mundial el 12/2/19 UY-ANEP-94805-NC-RFQ- FORM FEB-MAR 2019 / FORMADORES DE TC - Logística para encuentro de Formadores de TC a realizarse Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- IBRD / 86750 Early Education Post Open - National 13,000.00 10,398.45 Signed en Febrero y Marzo 2019 Quotations Envelope 21 05 01 08 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena). UY-ANEP-94891-NC-RFQ- JORN-DIREC-MAR2019 / EDUCACIÓN INICIAL - DIRECTORES Logística para Jornada con Directores de Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- IBRD / 86750 Early Education Post Open - National 4,000.00 3,102.07 Signed Educación Inicial a realizarse Quotations Envelope 28 13 07 29 en Marzo 2019 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayuno y Coffee Break). UY-ANEP-94892-NC-RFQ- JOR-ED INIC 3-2019 / DOCENTES EDUCACIÓN INICIAL Una Mirada Integradora. Logística para Request for Single Stage - One 2019-02- 2019-02- 2019-02- 2019-03- encuentro de Docentes de IBRD / 86750 Early Education Post Open - National 5,500.00 3,909.73 Signed Quotations Envelope 05 18 27 30 Educación Inicial . Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayuno y Coffee Break). UY-ANEP-94895-NC-RFQ- CURSO I MARZO 2019 / CURSO I Logística para encuentro de docentes a Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- realizarse en Marzo 2019 IBRD / 86750 Early Education Post Open - National 6,000.00 4,693.60 Signed Quotations Envelope 30 19 07 16 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena). UY-ANEP-94897-NC-RFQ- JORNADA MARZO 2019 / DIRECTORES E INSPECTORES TC. Logística para encuentro de Directores e Inspectores Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- IBRD / 86750 Early Education Post Open - National 11,000.00 9,663.32 Signed TC a realizarse en Marzo Quotations Envelope 30 19 07 12 2019 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena). UY-ANEP-94898-NC-RFQ- JORNADA MARZO 2019 / ENCUENTRO con MARTA SOUTO. Logística para encuentro de Formadores de TC con la Consultora Marta Request for Single Stage - One 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- IBRD / 86750 Early Education Post Open - National 5,000.00 3,629.25 Completed Souto a realizarse en Marzo Quotations Envelope 05 18 12 27 27 2019 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena). UY-ANEP-100260-NC- RFQJOR-ED INIC 2019 / DOCENTES EDUCACIÓN INICIAL Una Mirada Integradora. Logística para Request for Single Stage - One 2019-03- 2019-04- 2019-04- 2019-10- encuentro de Docentes de IBRD / 86750 Early Education Post Open - National 26,000.00 11,297.16 Signed Quotations Envelope 15 05 12 19 Educación Inicial. Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayuno y Coffee Break). ABRIL A OCTUBRE 2019 Page 7 UY-ANEP-100269-NC-RFQ- JORN-DIREC-2019 / EDUCACIÓN INICIAL - DIRECTORES Logística para Jornada con Directores de Request for Single Stage - One 2019-03- 2019-03- 2019-03- 2019-10- IBRD / 86750 Early Education Post Open - National 28,000.00 21,681.41 Signed Educación Inicial. Quotations Envelope 15 30 26 25 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayuno y Coffee Break). ABRIL A OCTUBRE 2019 UY-ANEP-100270-NC-RFQ- CONFERENCIAS 2019 / EDUCACIÓN INICIAL. Dos Request for Single Stage - One 2019-04- 2019-04- 2019-04- 2019-08- conferencias con Consultoras IBRD / 86750 Early Education Post Open - National 5,000.00 11,124.21 Signed Quotations Envelope 02 21 12 17 Expertas a realizarse en mayo y agosto 2019. Servicio de Catering (Coffee Break). UY-ANEP-100271-NC-RFQ- ALOJ ANDARIEGA-19 / ALOJAMIENTOS COLECCIÓN ANDARIEGA - Para docentes Request for Single Stage - One 2019-03- 2019-03- 2019-03- 2019-10- IBRD / 86750 Early Education Post Open - National 7,000.00 4,764.31 Signed de Educación Inicial que Quotations Envelope 13 31 12 26 participaran en encuentros a realizarse entre abril y octubre 2019. UY-ANEP-100274-NC-RFQ- CURSO I 201 / CURSO I Logística para encuentro de docentes . Alojamientos, Request for Single Stage - One 2019-03- 2019-04- 2019-03- 2019-10- Alquiler del salón equipado, IBRD / 86750 Early Education Post Open - National 35,000.00 25,778.44 Signed Quotations Envelope 15 01 07 19 Servicio de Catering (Desayunos, Coffee Break) a realizarse de ABRIL a OCTUBRE 2019 UY-ANEP-100279-NC-RFQ- JORNAD SOUTO 2019 / ENCUENTROS con MARTA SOUTO. Logística para encuentros de Formadores de TC con la Consultora Marta Request for Single Stage - One 2019-06- 2019-06- 2019-05- 2019-10- 2019-10- IBRD / 86750 Early Education Post Open - National 16,000.00 16,266.71 Completed Souto. Alojamientos, Alquiler Quotations Envelope 06 25 09 30 30 del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena) a realizarse en JULIO Y OCTUBRE 2019 UY-ANEP-100284-NC- DIRECT E INSPECT 2019 / DIRECTORES E INSPECTORES TC. Logística para encuentro de Directores e Inspectores Request for Single Stage - One 2019-02- 2019-03- 2019-03- 2019-10- TC Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 44,300.00 41,725.67 Signed Quotations Envelope 21 18 18 10 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena) a realizarse desde ABRIL a NOVIEMBRE 2019 UY-ANEP-100295-NC-RFQ- COHORTE 1 - 2019 / DIRECTORES TC COHORTE 1 Proceso formativo 2017- 2018. Logística para encuentros de Directores TC . Request for Single Stage - One 2019-04- 2019-04- 2019-04- 2019-09- IBRD / 86750 Early Education Post Open - National 11,000.00 18,287.87 Signed Alojamientos, Alquiler del Quotations Envelope 05 24 30 10 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena) a realizarse entre MAYO y SETIEMBRE 2019 UY-ANEP-100299-NC-RFQ- JORN-COORD-2019 / ENCUENTROS con COORDINACIÓN GENERAL y asesora GRACIELA FRIGERIO . Logística para el desarrollo de Request for Single Stage - One 2019-03- 2019-03- 2019-04- 2019-12- IBRD / 86750 Early Education Post Open - National 18,000.00 13,830.56 Signed jornadas: Alojamientos, Quotations Envelope 05 25 24 03 Alquiler del salón equipado, Servicio de Catering (desayunos, coffee, almuerzo y cena), a realizarse desde ABRIL a DICIEMBRE 2019 UY-ANEP-100315-NC-RFQ- FORMADORES 2019 / FORMADORES DE TC - Logística para encuentro de Formadores de TC . Request for Single Stage - One 2019-02- 2019-03- 2019-04- 2019-12- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 48,000.00 42,103.39 Signed Quotations Envelope 20 20 01 06 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena) a realizarse entre ABRIL y DICIEMBRE 2019 UY-ANEP-106181-NC-DIR- AMPL CATALOGOS2019 / Ampliación impresión Catálogos Colección 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- IBRD / 86750 Early Education Post Direct Selection Direct 4,200.00 3,773.25 Signed Andariega para entregar junto 14 14 18 14 21 28 30 con las Bibliotecas en Escuelas que constituyen cohorte 2017- 2018-2019 UY-ANEP-113313-NC-RFQ- JORN INSP TC-2019 / Jornada para Inspectores referente (apoyo a la Inspección Nacional de T.C). Logística para el desarrollo de la Request for Single Stage - One 2019-05- 2019-05- 2019-05- 2019-12- IBRD / 86750 Early Education Post Open - National 10,000.00 7,376.51 Signed jornadas : Alojamiento, Quotations Envelope 10 20 17 03 alquiler de salón equipado, servicio de Catering ( desayuno, coffe, almuerzo, cena ) en Mayo y diciembre 2019. UY-ANEP-113315-NC-RFQ- JORN DIREC TC-2019 / Encuentro Directores - Apoyo a la Inspección Nacional de TC- Logística para el desarrollo de Request for Single Stage - One 2019-05- 2019-05- 2019-05- 2019-10- las jornadas : Alojamiento, IBRD / 86750 Early Education Post Open - National 12,000.00 9,065.31 Signed Quotations Envelope 13 29 17 29 Alquiler de salón equipado, Servicio de Catering ( desayuno, cofee,almuerzo, cena) a realizarse en Octubre del 2019 UY-ANEP-116997-NC-RFQ- ALOJ-SEMINARIOS / Alojamientos para docentes de los pueblos de Nico Pérez, Florida y Batlle y Ordoñez, Request for Single Stage - One 2019-05- 2019-06- 2019-06- 2019-09- IBRD / 86750 Early Education Post Open - National 1,100.00 681.72 Terminated Lavalleja que participarán en Quotations Envelope 31 05 05 06 los seminarios territorio a efectuarse en Montevideo los días 7/06, 19/07, 09/08 y 06/09. Cantidad 10 UY-ANEP-128558-NC-RFQ- ALOJAMIENTOS 2019 / Alojamientos para docentes del Interior que participarán Request for Single Stage - One 2019-08- 2019-08- 2019-08- 2019-10- IBRD / 86750 Early Education Post Open - National 2,500.00 1,242.32 Signed en jornadas de capacitación el Quotations Envelope 26 31 30 25 6 de setiembre y el 25 de octubre 2019 (40 y 30 alojamientos respectivamente) UY-ANEP-157748-NC-RFQ- FORM FEB/MZO 2020 / Servicio de alojamiento con Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-03- desayuno para docentes del IBRD / 86750 Early Education Post Open - National 2,700.00 2,466.04 Signed Quotations Envelope 10 17 14 20 Interior que participarán en los encuentros de Formadores febrero/marzo 2020 Page 8 UY-ANEP-157749-NC-RFQ- FORM ABR-DIC 2020 / Servicio de alojamiento con Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-12- desayuno para docentes del IBRD / 86750 Early Education Post Open - National 6,700.00 2,003.22 Signed Quotations Envelope 02 22 16 30 Interior que participarán en los encuentros de Formadores abril- diciembre 2020 UY-ANEP-157751-NC-RFQ- CURSOI ABR-NOV2020 / CURSO I Logística para encuentro de docentes. Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-11- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 31,000.00 26,351.46 Signed Quotations Envelope 02 19 12 19 salón equipado, Servicio de Catering (Desayunos, Coffee Break) a realizarse de ABRIL a NOVIEMBRE 2020 UY-ANEP-157753-NC-RFQ- DIREC INICIAL 2020 / DIRECTORES DE EDUCACIÓN INICIAL - Logística para encuentro de docentes . Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-10- IBRD / 86750 Early Education Post Open - National 41,000.00 4,385.66 Signed Alojamientos, Alquiler del Quotations Envelope 02 27 12 31 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzos) a realizarse de ABRIL a OCTUBRE 2020 UY-ANEP-157763-NC-RFQ- DIRECT. MARZO 2020 / DIRECTORES - Logística para encuentro de docentes . Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-03- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 6,300.00 6,348.01 Signed Quotations Envelope 12 21 27 31 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo) a realizarse en MARZO 2020 UY-ANEP-157768-NC-RFQ- DIREC ABR-OCT 2020 / DIRECTORES - Logística para encuentro de docentes . Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-10- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 32,000.00 22,138.15 Signed Quotations Envelope 02 17 17 30 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo) a realizarse desde ABRIL a OCTUBRE 2020 UY-ANEP-157775-NC-RFQ- INSP MARZO 2020 / INSPECTORES- Logística para encuentro de docentes . Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-03- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 2,300.00 4,255.53 Signed Quotations Envelope 11 21 27 31 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo) a realizarse en MARZO 2020 UY-ANEP-157776-NC-RFQ- INSP JUN-OCT 2020 / INSPECTORES - Logística para encuentro de docentes . Request for Single Stage - One 2020-05- 2020-05- 2020-02- 2020-10- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 7,000.00 3,769.55 Signed Quotations Envelope 04 19 27 30 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo) a realizarse en JUNIO a OCTUBRE 2020 UY-ANEP-157781-NC-RFQ- AUDIO INICIAL 2020 / Servicio audio, video y apoyo Request for Single Stage - One 2020-03- 2020-03- 2020-11- IBRD / 86750 Early Education Post Open - National 2,000.00 0.00 Canceled tecnológico para jornadas de Quotations Envelope 04 15 30 Educación Inicial a realizarse entre abril y noviembre 2020 UY-ANEP-157782-NC-RFQ- MAESTROS MZO 2020 / MAESTROS ED INICIAL - Logística para encuentro de Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-03- docentes . Alojamientos, IBRD / 86750 Early Education Post Open - National 5,000.00 4,564.84 Signed Quotations Envelope 10 19 27 31 Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break) a realizarse en MARZO 2020 UY-ANEP-157783-NC-RFQ- MAEST ABR-NOV 2020 / MAESTROS INICIAL - Logística para encuentro de docentes . Request for Single Stage - One 2020-03- 2020-03- 2020-06- 2020-11- IBRD / 86750 Early Education Post Open - National 40,000.00 35,670.12 Signed Alojamientos, Servicio de Quotations Envelope 04 30 01 30 Catering (Desayunos, Coffee Break, ) a realizarse desde ABRIL - NOVIEMBRE 2020 UY-ANEP-157780-NC-RFQ- ANDAR ABR-NOV 2020 / COLECCIÓN ANDARIEGA- Logística para encuentro de docentes . Alojamientos ,alquiler de salon equipado , Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-11- IBRD / 86750 Early Education Post Open - National 15,000.00 8,269.02 Signed Servicio de Catering Quotations Envelope 11 27 25 14 (Desayunos, Coffee Break, ) a realizarse en 5 encuentros entre ABRIL y NOVIEMBRE 2020- Participantes - 80 por jornada. UY-ANEP-199059-NC-RFQ- IMP CATALOGO 2020 / Request for Single Stage - One 2020-10- 2020-10- 2020-11- 2021-02- Impresión de 25 catálogos de IBRD / 86750 Early Education Post Open - National 1,500.00 351.92 Signed Quotations Envelope 14 28 09 08 libros para la colección andariega CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UY-ANEP-14569-CS-INDV- Individual Monitoring and Evaluation 2017-06- 2017-06- 2017-06- 2017-12- AS TERMICO 2017 / Asesores IBRD / 86750 Post Consultant Limited 3,000.00 0.00 Canceled 2017-06-01 System 01 01 01 29 Técnicos Eventuales Térmicos Selection UY-ANEP-14803-CS-INDV- Individual SARAVIA / Carola Saravia, Monitoring and Evaluation 2017-04- 2017-05- 2017-05- 2017-06- 2017-08- 2017-09- IBRD / 86750 Post Consultant Direct 7,500.00 6,335.77 Signed 2017-05-12 contratación Técnica Gestión System 05 15 18 19 09 19 Selection Cultural UY-ANEP-14559-CS-CDS- THE LEARNING 2017 / Desarrollo y gestión de sistema de Información para Monitoring and Evaluation 2017-04- 2017-05- 2017-09- 2017-08- 2017-12- la detección temprana de IBRD / 86750 Post Direct Selection Direct 120,000.00 120,000.00 Signed 2017-05-22 System 26 22 05 02 31 debilidades en el desarrollo evolutivo de los niños de Inicial - año 2107 (The Learning Bar) UY-ANEP-14571-CS-INDV- Individual DIRECT OBRA 2017 / 8 Pending 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Primary Education Post Consultant Limited 48,500.00 0.00 2017-06-01 Directores de Obra para obras Implementation 01 01 01 29 Selection a iniciar 2017 UY-ANEP-14482-CS-INDV Individual MARTA SOUTO 2017 / Asesor Monitoring and Evaluation 2018-03- 2017-06- 2017-04- 2017-06- 2017-04- 2017-07- 2017-04- 2017-08- 2017-08- IBRD / 86750 Post Consultant Direct 1,400.00 4,200.00 Completed 2017-06-14 externo para Formación en System 09 19 18 26 18 03 27 31 31 Selection Servicio Dra. Marta Souto Page 9 UY-ANEP-14556-CS-INDV- Individual UCP 2017 / Coordinación 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 119,064.00 83,195.86 Signed 2017-06-01 Administrativa 1 contrato 01 01 01 01 01 01 31 Selection junio 2017 - mayo 2022 UY-ANEP-14555-CS-INDV- Individual UCP-2017 / Equipamiento 2 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 359,672.00 223,748.09 Signed 2017-06-01 contratos junio 2017 - mayo 01 01 01 01 01 01 01 31 Selection 2022 UY-ANEP-14553-CS-INDV- Individual UCP-2017 / Adquisiciones 4 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 776,072.00 320,430.42 Signed 2017-06-01 contratos junio 2017 - mayo 01 01 01 01 01 01 01 31 Selection 2022 UY-ANEP-14558-CS-INDV- Individual UCP 2017 / Asesoramiento 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 169,276.00 96,730.90 Signed 2017-06-01 Jurídico 1 Contrato junio 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14557-CS-INDV- Individual UCP-2017 / Apoyo 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 395,295.00 243,385.63 Signed 2017-06-01 Informático 3 contratos junio 01 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14552-CS-INDV- Individual UCP 2017 / Programación y 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 483,820.00 304,287.96 Signed 2017-06-01 Monitoreo 3 contratos junio 01 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14551-CS-INDV- Individual UCP-2017 / Planta Física 19 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 3,362,686.00 2,690,843.69 Signed 2017-06-01 contratos junio 2017 - mayo 01 01 01 01 01 01 01 31 Selection 2022 UY-ANEP-14550-CS-INDV- Individual UCP-2017 / Formación en 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2018-01- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 388,337.00 89,517.33 Signed 2017-06-01 Servicio 3 contratos junio 01 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14554-CS-INDV- Individual UCP-2017 / Finanzas y 2017-07- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 225,700.00 109,249.62 Signed 2017-06-01 Desembolsos 1 contrato junio 01 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14563-CS-INDV- Individual AS CIVILES 2017 / 5 Asesores Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 33,000.00 0.00 2017-06-01 Técnicos Eventuales System Implementation 01 01 01 29 Selection Ingenieros Civiles UY-ANEP-14548-CS-INDV- UCP 2017 / División Individual 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2019-05- 2022-05- Investigación, Evaluación y IBRD / 86750 Early Education Post Consultant Direct 314,292.00 90,660.04 Signed 2017-06-01 01 01 01 01 01 01 07 31 Estadística 2 contratos junio Selection 2017 - mayo 2022 UY-ANEP-14564-CS-INDV- Individual AS ELECTRICOS 2017 / 5 Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 18,700.00 0.00 2017-06-01 Asesores Técnicos Eventuales System Implementation 01 01 01 29 Selection - Ingenieros Eléctricos UY-ANEP-14565-CS-INDV- Individual AS SANITARIOS 2017 / 5 Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 10,900.00 0.00 2017-06-01 Asesores Técnicos Eventuales System Implementation 01 01 01 29 Selection Ingenieros Sanitarios UY-ANEP-14566-CS-INDV- Individual AS AGRIMENSOR 2017 / 5 Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 4,700.00 0.00 2017-06-01 Asesores Técnicos Eventuales System Implementation 01 01 01 29 Selection Ingenieros Agrimensores UY-ANEP-14567-CS-INDV- Individual METRAJISTAS 2017 / 5 Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 3,700.00 0.00 2017-06-01 Asesores Técnicos Eventuales System Implementation 01 01 01 29 Selection Metrajistas UY-ANEP-16524-CS-INDV / Individual Monitoring and Evaluation 2019-03- 2017-08- 2019-03- 2017-08- 2019-03- 2017-09- 2018-09- Ayudante para Investigación " IBRD / 86750 Post Consultant Open 8,700.00 0.00 Canceled 2017-06-19 System 26 18 26 25 26 04 04 Diagnostico de Género" Selection UY-ANEP-19234-CS-CDS / Instituto Nacional de Monitoring and Evaluation 2015-11- 2017-06- 2015-12- 2017-06- 2017-05- 2021-05- IBRD / 86750 Post Direct Selection Direct 1,500,000.00 1,500,000.00 Signed 2017-06-27 Evaluación Educativa (INEED) System 19 27 18 27 31 31 2017-2021 UY-ANEP-45069-CS-CDS- DISENO GRAFICO / Diseño 2018-01- 2018-02- 2018-04- IBRD / 86750 Early Education Post Direct Selection Direct 1,000.00 0.00 Canceled 2018-01-22 Gráfico del Catálogo para la 22 15 15 Colección Andariega UY-ANEP-48225-CS-INDV- SOUTO 2018 / CONSULTOR Individual Monitoring and Evaluation 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2018-07- 2018-07- EXTERNO PARA INFORMACIÓN IBRD / 86750 Post Consultant Direct 8,000.00 8,000.00 Completed 2018-02-08 System 01 08 23 02 27 31 31 EN SERVICIO Dr. MARTA Selection SOUTO. UY-ANEP-53689-CS-INDV- PABLO GARCIA 2018 / CONSULTOR PABLO GARCIA - Individual Monitoring and Evaluation 2018-03- 2018-03- 2018-04- 2018-05- 2018-06- 2018-06- Encuentro con equipo Curso I IBRD / 86750 Post Consultant Direct 1,000.00 1,000.00 Signed 2018-03-20 System 06 22 20 10 25 26 y Conferencia a Directores de Selection Tiempo Completo. Tema Tránsito escolar e inclusión UY-ANEP-53694-CS-INDV G- UNTOIGLICH 2018 / CONSULTOR GISELA Individual UNTOIGLICH - Conferencia Monitoring and Evaluation 2018-03- 2018-03- 2018-04- 2018-05- 2018-05- 2018-05- IBRD / 86750 Post Consultant Direct 1,000.00 1,000.00 Signed 2018-03-20 para Docentes de Educación System 01 22 20 10 26 26 Selection Inicial. Tema: Los diagnósticos en la 1ra infancia se escriben con lapiz " UY-ANEP-52250-CS-INDV- RICARDO BAQUERO / Honorarios Consultor : Lic. Psicopedagogia esp. en re- Individual Monitoring and Evaluation 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- 2018-04- 2018-04- 2018-04- educación Ricardo Baquero IBRD / 86750 Post Consultant Direct 1,700.00 1,700.00 Signed 2018-03-20 System 12 22 20 02 03 10 13 14 para brindar 2 conferencias el Selection día 13 y 14 de abril del 2018 con maestros y Directores de ETC UY-ANEP-16521-CS-CQS / Individual Coordinador Investigación " Monitoring and Evaluation 2018-06- 2018-05- 2018-12- 2018-06- 2018-12- 2019-06- IBRD / 86750 Post Consultant Open 37,000.00 3,258.11 Signed 2018-03-21 Diagnósito de de Género -40 System 01 27 07 06 07 06 Selection hs. UY-ANEP-55153-CS-INDV / Individual 2 Investigadores para el Monitoring and Evaluation 2018-06- 2018-05- 2018-09- 2018-05- 2018-12- 2018-06- 2018-12- 2019-06- IBRD / 86750 Post Consultant Open 51,000.00 3,233.58 Signed 2018-03-22 proyecto de Investigación " System 01 21 11 28 13 07 13 07 Selection Diagnóstico de Género ". UY-ANEP-55396-CS-INDV- INFORMATICO 2018 / Individual 2018-04- 2018-05- 2018-06- 2018-05- 2018-06- 2018-06- 2019-01- 2022-05- Informático para UCP - IBRD / 86750 Early Education Post Consultant Open 70,000.00 963.51 Signed 2018-03-22 13 11 07 20 07 01 01 31 Contrato mayo 2018 - mayo Selection 2022 UY-ANEP-55399-CS-INDV- MESA AYUDA 2018 / 2 Individual 2018-04- 2018-05- 2018-05- 2018-06- 2018-07- 2022-05- Asistentes Técnicos para IBRD / 86750 Early Education Post Consultant Open 194,000.00 3,650.28 Signed 2018-03-22 12 11 20 01 25 31 soporte Mesa de Ayuda Selection Plataforma Gurí. UY-ANEP-58036-CS-INDV-G FRIGERIO / CONSULTOR Graciela Frigerio. Visitas a Individual Escuelas TC y 2 Conferencias Monitoring and Evaluation 2018-04- 2018-04- 2018-04- 2018-05- 2018-05- 2018-05- 2018-07- 2018-09- 2018-09- IBRD / 86750 Post Consultant Direct 3,000.00 3,000.00 Completed 2018-04-10 para Directores y Maestros System 18 12 20 11 21 31 12 29 29 Selection nuevos de ETC. Tema: "Gestión y Organización educativa de las Escuelas" Page 10 UY-ANEP-59853-CS-INDV- Individual AS ELECTRICOS 2018 / 5 Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 20,100.00 0.00 2018-04-18 Asesores Técnicos Eventuales System Implementation 18 18 18 28 Selection - Ingenieros Eléctricos UY-ANEP-59854-CS-INDV- Individual AS CIVILES 2018 / 5 Asesores Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 35,000.00 0.00 2018-04-18 Técnicos Eventuales - System Implementation 18 18 18 28 Selection Ingenieros Civiles UY-ANEP-59855-CS-INDV- Individual AS SANITARIOS 2018 / 5 Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 11,800.00 0.00 2018-04-18 Asesores Técnicos Eventuales System Implementation 18 18 18 28 Selection - Ingenieros Sanitarios UY-ANEP-59857-CS-INDV- Individual AS AGRIMENSOR 2018 / 5 Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 5,000.00 0.00 2018-04-18 Asesores Técnicos Eventuales System Implementation 18 18 18 28 Selection - Ingenieros Agrimensores UY-ANEP-59858-CS-INDV- Individual METRAJISTAS 2018 / 5 Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 4,000.00 0.00 2018-04-18 Asesores Técnicos Eventuales System Implementation 18 18 18 28 Selection - Metrajistas UY-ANEP-59860-CS-INDV- Individual AS ACUSTICO 2018 / 1 Asesor Monitoring and Evaluation 2018-03- 2018-08- 2018-03- 2018-08- 2018-04- 2018-09- 2018-07- 2018-10- IBRD / 86750 Post Consultant Limited 3,200.00 3,529.88 Signed 2018-08-01 Técnico Eventual - Ac. System 05 06 09 13 09 03 05 03 Selection Acústico UY-ANEP-63169-CS-INDV- ING-COLON 2018 / ING. CARLOS COLON. Asesoría Individual Monitoring and Evaluation 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- técnica por modificación IBRD / 86750 Post Consultant Direct 1,300.00 1,094.19 Signed 2018-05-17 System 17 19 28 11 10 12 proyecto de estructura en la Selection Escuela N° 8 de Fraile Muerto, Cerro Largo UY-ANEP-63185 CS INDV Individual DISEN GRAF 2018 / Diseñador Monitoring and Evaluation 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-09- IBRD / 86750 Post Consultant Limited 1,200.00 1,964.51 Signed 2018-05-17 de Catálogo Colección System 17 28 01 29 13 30 28 Selection Andariega UY-ANEP-66203-CS-INDV- ARQ SPOSITO 2018 / Contratación de la Arq. María Individual Monitoring and Evaluation 2018-05- 2018-06- 2018-05- 2018-06- 2018-11- 2018-07- 2019-02- 2018-08- Spósito para el metraje y IBRD / 86750 Post Consultant Direct 1,900.00 1,455.20 Signed 2018-06-11 System 15 13 10 22 29 06 07 06 presupuesto de nueva Selection propuesta arquitectónica de la Escuela N° 41 de Montevideo UY-ANEP-66204-CS-INDV- ING MOLINOLO / Contratación Individual Asesoría Técnica Proyecto Monitoring and Evaluation 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-09- 2018-08- IBRD / 86750 Post Consultant Direct 3,400.00 2,728.49 Signed 2018-06-11 sanitario de la nueva System 11 13 11 22 06 05 06 Selection propuesta arquitectónica de la Escuela 41 de Montevideo. UY-ANEP-66205-CS-INDV- ING LOPEZ / Contratación Asesoría Técnica Ing. Gonzalo Individual Monitoring and Evaluation 2018-05- 2018-06- 2018-05- 2018-06- 2018-07- 2019-03- 2018-08- López por proyecto eléctrico IBRD / 86750 Post Consultant Direct 6,600.00 5,559.66 Signed 2018-06-11 System 09 13 18 22 06 20 06 de la nueva propuesta Selection arquitectónica de la Escuela 41 de Montevideo UY-ANEP-66206-CS-INDV- AS-ELECT 2018 / Individual 2018-06- 2018-07- 2018-07- 2018-08- 2018-07- 2018-08- 2018-11- 2022-05- Contratación de un Técnico IBRD / 86750 Early Education Post Consultant Open 115,000.00 0.03 Signed 2018-06-11 11 27 30 05 30 17 20 16 Electricista para UCP período Selection agosto 2018 - mayo 2022 UY-ANEP-66208-CS-INDV- AS-SANIT 2018 / Individual 2018-06- 2018-07- 2018-08- 2018-08- 2018-08- 2018-08- 2018-11- 2022-05- Contratación Asesor Técnico IBRD / 86750 Early Education Post Consultant Open 115,000.00 107,237.13 Signed 2018-06-11 11 27 06 05 06 17 19 16 Sanitario para UCP agosto Selection 2018 - mayo 2022 UY-ANEP-68128-CS-INDV- ARQ-D-OBRAS2018 / Individual Directores de Obra para las 2018-08- 2018-09- 2019-08- 2018-09- 2019-12- 2018-09- 2019-12- 2022-05- IBRD / 86750 Early Education Post Consultant Open 250,000.00 47,003.59 Signed 2018-06-26 obras a llevarse a cabo desde 09 01 20 10 30 18 30 31 Selection 2018 al 2022. Se estima 24 Directores de Obra. UY-ANEP-78959-CS-INDV- Individual CHOFER 2018 / Contratación Under 2019-08- 2018-10- 2018-11- 2018-12- 2022-05- IBRD / 86750 Early Education Post Consultant Open 45,000.00 0.00 2018-09-20 de un Chófer para UCP Implementation 13 21 10 18 31 Selection período 2018-2022 UY-ANEP-90275-CS-INDV- M SOUTO 2019 / Servicio de Consultoría para realizar un Individual espacio de formación con Monitoring and Evaluation 2018-12- 2018-12- 2018-12- 2019-02- 2019-03- 2019-03- 2019-07- 2019-10- 2019-10- IBRD / 86750 Post Consultant Direct 8,100.00 8,000.00 Completed 2018-12-10 integrantes del equipo, System 10 10 10 28 20 10 29 30 30 Selection Formadores y Coordinadores del Componente Formación en Servicio del PAEPU UY-ANEP-98323-CS-INDV- DORA RIESTRA 2019 / Contratación directa Dra. Dora Riestra, Experta de Formación Individual Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- Permanente en Ciencias del IBRD / 86750 Post Consultant Direct 3,800.00 3,000.00 Completed 2019-02-04 System 04 04 04 20 20 27 04 06 06 Lenguaje, que participará en Selection jornadas de trabajo con Equipo de Lenguaje y Formadores de PAEPU. UY-ANEP-98331-CS-INDV- PATRIC SARLE 2019 / Contratación Directa Lic. Patricia Sarlé, Profesora en Educación Preescolar, que Individual Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-05- 2019-03- 2019-05- 2019-08- 2019-08- 2019-08- participará en la IBRD / 86750 Post Consultant Direct 2,700.00 2,000.00 Completed 2019-02-03 System 05 04 06 07 20 14 16 17 17 inplementación de un espacio Selection de de formación para docentes de Inicial y Primaria, brindando dos conferencias a realizarse en agosto 2019 UY-ANEP-98337-CS-INDV-G UNTOIGLICH 2019 / Contratación Directa Psic. Gisela Untoiglich, asesoramiento y participación Individual Monitoring and Evaluation 2019-02- 2019-02- 2018-12- 2019-03- 2019-03- 2019-03- 2019-05- 2019-05- 2019-05- en el área de la Educación IBRD / 86750 Post Consultant Direct 2,700.00 2,000.00 Completed 2019-02-04 System 05 06 13 07 20 27 24 25 25 Inicial con énfasis en el Selection vínculo Familia-Escuela , reuniones con el Equipo de trabajo y autoridades, encuentros con Maestros . UY-ANEP-98342-CS-INDV- GRAC FRIGERIO 2019 / Contratación directa Dra. Graciela Frigerio que participará en encuentros de Individual Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-04- 2019-12- 2019-12- marzo a diciembre con con IBRD / 86750 Post Consultant Direct 21,400.00 14,994.00 Completed 2019-02-04 System 05 04 05 14 25 03 03 03 Equipo de PAEPU, Inspectores, Selection Directores y Maestros de ETC con el objetivo de profundizar sobre aspectos relevantes en la tarea de los docentes. UY-ANEP-98345-CS-INDV- ANA CERUTTI 2019 / Contratación directa Lic Ana Cerutti Experta en Psicomotricidad, que Individual participará en encuentros Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-10- 2019-10- IBRD / 86750 Post Consultant Direct 12,500.00 8,898.31 Completed 2019-02-04 presenciales y trabajos a System 05 04 05 07 20 21 27 31 19 Selection distancia por 7 meses entre febrero y octubre 2019 dirigido al Componente Educación Inicial, Directores, Maestros de ETC. Page 11 UY-ANEP-98347-CS-INDV- PABLO GARCIA 2019 / Contratación directa Mag Pablo García, experto en la temática de inclusión social y Individual Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-09- 2019-09- 2019-09- tránsito educativo, IBRD / 86750 Post Consultant Direct 3,000.00 2,000.00 Completed 2019-02-04 System 04 04 04 04 20 01 03 05 05 participando en encuentros Selection con el equipo de gestión del PAEPU, Inspectores y Directores de ETC a realizarse en Setiembre 2019. UY-ANEP-105801-CS-INDV- ARQ DUARTE 2019 / Contratación Directa del Arq. Individual Fernando Duarte para Monitoring and Evaluation 2019-02- 2019-03- 2019-03- 2019-03- 2019-06- 2019-04- 2019-06- 2019-05- IBRD / 86750 Post Consultant Direct 1,000.00 489.23 Signed 2019-03-13 Dirección de Obra en la System 20 15 13 24 04 07 05 17 Selection Escuela N° 24 Localidad de Vichadero, Departamento de Rivera UY-ANEP-105804-CS-INDV- MARIANA GOL 2019 / Contratación de la Consultora Individual Metrajista Arq. Mariana Gol Monitoring and Evaluation 2019-02- 2019-03- 2019-06- 2019-04- 2019-06- 2019-04- 2019-07- 2019-05- IBRD / 86750 Post Consultant Direct 6,260.00 321.20 Signed 2019-03-15 para al actualización de System 20 15 04 07 28 16 19 16 Selection presupuesto de obra del Instituto de Formación en Servicio. UY-ANEP-105793-CS-INDV- Individual AS CIVILES 2019 / 5 Asesores Monitoring and Evaluation 2019-03- 2019-04- 2019-07- 2019-04- 2019-08- 2019-04- 2019-09- 2019-12- IBRD / 86750 Post Consultant Open 35,000.00 30,654.65 Signed 2019-03-22 Técnicos Eventuales - System 30 15 03 22 20 22 09 31 Selection Ingenieros Civiles UY-ANEP-105796-CS-INDV- AS ELECTRICO 2019 / 5 Individual Monitoring and Evaluation Under 2019-04- 2019-04- 2019-04- 2019-12- Asesores Técnicos Eventuales IBRD / 86750 Post Consultant Open 19,700.00 0.00 2019-03-22 System Implementation 15 22 22 31 - Ingenieros Eléctricos/ Selection Técnicos Electricistas UY-ANEP-105798-CS-INDV- AS SANITARIO 2019 / 5 Individual Asesores Técnicos Eventuales Monitoring and Evaluation Under 2019-04- 2019-04- 2019-04- 2019-12- IBRD / 86750 Post Consultant Open 11,500.00 0.00 2019-03-22 - Ingenieros/Arquitecto System Implementation 15 22 22 31 Selection /Técnico en Instalaciones Sanitarias UY-ANEP-105799-CS-INDV- Individual AS AGRIMENSO 2019 / 5 Monitoring and Evaluation 2019-03- 2019-04- 2019-06- 2019-04- 2019-07- 2019-04- 2019-08- 2019-12- IBRD / 86750 Post Consultant Open 5,000.00 1,655.71 Signed 2019-03-22 Asesores Técnicos Eventuales System 31 15 12 22 30 22 01 31 Selection - Ingenieros Agrimensores UY-ANEP-105800-CS-INDV- AS METRAJ 2019 / 5 Asesores Individual Monitoring and Evaluation Under 2019-04- 2019-04- 2019-04- 2019-12- Técnicos Eventuales - IBRD / 86750 Post Consultant Open 3,800.00 0.00 2019-03-22 System Implementation 15 22 22 31 Ingeniero/Arquitecto Selection Metrajistas UY-ANEP-109134-CS-INDV- ASIST GENERO 2019 / ASISTENTE ADMINISTRATIVO "Ayudante A" 20 horas, que Individual Monitoring and Evaluation 2019-04- 2019-06- 2019-06- 2019-07- 2019-12- 2019-07- 2019-07- 2020-07- apoyará en la estrategia de IBRD / 86750 Post Consultant Open 8,900.00 650.69 Signed 2019-04-09 System 11 11 25 09 10 27 17 26 investigación para la Selection construcción de un Plan Nacional de Igualdad de Género de ANEP. UY-ANEP-118445-CS-INDV- ALONSO-184-2019 / Contratación Arq. Alonso para Individual ajuste de metraje y Monitoring and Evaluation 2019-06- 2019-06- 2019-06- 2019-06- 2019-08- 2019-06- 2019-09- 2019-06- IBRD / 86750 Post Consultant Direct 175.00 130.25 Signed 2019-06-07 presupuestación para la Obra System 04 07 04 13 23 21 06 28 Selection en Escuela N° 184, Montevideo por cambio en el proyecto ejecutivo. UY-ANEP-121831-CS-INDV / Contratación Agrimensor Andrés Pisón para realizar la Individual asesoría en Agrimensura Monitoring and Evaluation 2019-06- 2019-07- 2019-07- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- IBRD / 86750 Post Consultant Direct 1,000.00 920.86 Signed 2019-07-08 (medición, determinación y System 04 08 01 15 30 19 01 18 Selection graficación ) de los padrones donde se ubicará la Escuela Nº 224 de Montevideo, UY-ANEP-59861-CS-INDV- Individual AS FORESTAL 2018 / 1 Asesor Monitoring and Evaluation 2018-06- 2018-06- 2018-07- 2018-08- IBRD / 86750 Post Consultant Limited 3,200.00 0.00 Canceled 2018-06-01 Técnico Eventual - Ac. System 04 11 05 06 Selection Forestal UY-ANEP-59859-CS-INDV- Individual AS TERMICO 2018 / 1 Asesor Monitoring and Evaluation 2018-08- 2018-08- 2018-09- 2018-10- IBRD / 86750 Post Consultant Limited 3,200.00 0.00 Canceled 2018-08-01 Técnico Eventual - Ac. System 06 13 03 03 Selection Térmico UY-ANEP-156786-CS-INDV- ELECT ESC 9 MDEO / Individual Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- Contratación Asesor para IBRD / 86750 Post Consultant Open 3,700.00 0.00 Canceled 2020-02-18 System 02 05 03 04 Proyecto de eléctrica para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-156789-CS-INDV- AGRIM ESC 9 MDEO / Individual Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- Contratación Asesor para IBRD / 86750 Post Consultant Open 900.00 0.00 Canceled 2020-02-18 System 02 05 03 04 Proyecto Agrimensura para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-157316-CS-INDV- CIVIL ESC320 2020 / Asesor Individual para proyecto de estructura Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 6,500.00 0.00 Canceled 2020-03-02 Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157317-CS-INDV- ELECT-ESC320-2020 / Asesor Individual para proyecto de eléctrica Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 3,700.00 0.00 Canceled 2020-03-02 Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157318-CS-INDV- SANIT ESC320-2020 / Asesor Individual para proyecto de sanitaria Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 2,200.00 0.00 Canceled 2020-03-02 Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157319-CS-INDV- AGRIM ESC320-2020 / Asesor Individual para proyecto de agrimensura Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 900.00 0.00 Canceled 2020-03-02 Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157321-CS-INDV- METRA ESC320-2020 / Individual Asesor para proyecto de Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 700.00 0.00 Canceled 2020-03-02 metraje Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157794-CS-INDV- DIR OBRA 154-2020 / Director de Obra para asesoramiento, ejecución de recaudos y dirección de las Individual obras del plan de 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2021-04- IBRD / 86750 Early Education Post Consultant Open 12,000.00 10,517.88 Signed 2020-02-05 mantenimiento de diferentes 03 09 07 25 12 01 12 01 Selection escuelas del Dep Rivera, de obras menores en la Esc 88 del mismo departamento y la dirección de obras de la Escuela 124 Tacuarembó Page 12 UY-ANEP-157795-CS-DIR OBRA 65 MDEO-2020 / Individual 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-12- Director obra para la Escuela IBRD / 86750 Early Education Post Consultant Open 11,000.00 9,407.49 Signed 2020-02-10 02 14 11 30 30 06 30 07 65 de Ciudad Vieja del Selection Departamento de Montevideo UY-ANEP-166125-CS-INDV- ARQ M. GOL 2020 / Actualización del presupuesto Individual realizado para las obras en la Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-05- 2020-05- 2020-06- 2020-08- IBRD / 86750 Post Consultant Direct 200.00 192.58 Completed 2020-03-24 Escuela Nº 65 de Montevideo , System 24 24 24 22 12 12 12 01 11 Selection debido a cambios que se debieron realizar en el proyecto ejecutivo UY-ANEP-181959-CS-INDV- CIVIL ESC163 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de estructura IBRD / 86750 Post Consultant Open 6,500.00 0.00 2020-06-25 System Implementation 08 11 09 08 Escuela N° 163, Departamento Selection de Montevideo UY-ANEP-181961-CS-INDV- ELEC 163 MDEO2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de eléctrica IBRD / 86750 Post Consultant Open 3,700.00 0.00 2020-06-25 System Implementation 08 11 09 08 Escuela N° 163, Departamento Selection de Montevideo UY-ANEP-181962-CS-INDV- SANIT ESC163 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de sanitaria IBRD / 86750 Post Consultant Open 2,200.00 0.00 2020-06-25 System Implementation 08 11 09 08 Escuela N° 163, Departamento Selection de Montevideo UY-ANEP-181964-CS-INDV- AGRIM ESC163 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de agrimensura IBRD / 86750 Post Consultant Open 900.00 0.00 2020-06-25 System Implementation 08 11 09 08 Escuela N° 163, Departamento Selection de Montevideo UY-ANEP-181968-CS-INDV- Individual METRAJIS 163 2020 / Asesor Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- IBRD / 86750 Post Consultant Open 700.00 0.00 2020-06-25 para metraje Escuela N° 163, System Implementation 08 11 09 08 Selection Departamento de Montevideo UY-ANEP-182125-CS-INDV- BURGUEÑO 2020 / Ajuste del proyecto de instalación Individual Monitoring and Evaluation 2020-06- 2020-06- 2020-06- 2020-07- 2020-09- 2020-08- 2020-09- 2020-09- 2020-10- eléctrica realizado en el 2014 IBRD / 86750 Post Consultant Direct 2,200.00 1,650.69 Completed 2020-06-26 System 25 26 17 25 01 14 07 03 09 para el reciclaje del Liceo N° Selection 34 a transformarse en Formación en Servicio UY-ANEP-182162-CS-INDV- SANIT E6 TBO 2020 / Asesor Individual Monitoring and Evaluation 2020-06- 2020-07- 2020-10- 2020-07- 2020-10- 2020-08- 2020-12- 2020-09- para proyecto de sanitaria IBRD / 86750 Post Consultant Open 2,200.00 2,157.02 Signed 2020-06-26 System 26 09 19 12 19 10 09 09 Escuela N° 6, Departamento Selection de Tacuarembó UY-ANEP-182163-CS-INDV METRAJ 6 TBO 2020 / Asesor Individual Monitoring and Evaluation 2020-10- 2020-08- 2020-10- 2020-09- 2020-11- 2020-10- 2021-05- 2021-04- para proyecto de metraje IBRD / 86750 Post Consultant Open 700.00 1,970.50 Signed 2020-06-29 System 26 17 26 07 09 12 04 10 Escuela N° 6, Departamento Selection de Tacuarembó UY-ANEP-156790-CS-INDV- METRAJ ESC 9 MDEO / Individual Monitoring and Evaluation Under 2021-02- 2020-07- 2021-01- 2020-07- 2021-03- 2020-08- 2020-09- Contratación Asesor para IBRD / 86750 Post Consultant Open 700.00 0.00 2020-06-29 System Implementation 01 12 22 15 03 13 12 Proyecto de metraje para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-156783-CS-INDV- CIVIL ESC 9 MDEO / Individual Monitoring and Evaluation 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-10- 2020-09- Contratación Asesor para IBRD / 86750 Post Consultant Open 6,500.00 2,764.25 Signed 2020-06-29 System 01 12 20 15 29 13 15 12 Proyecto de estructura para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-157322-CS-INDV- CIVIL ESC161-2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de estructura IBRD / 86750 Post Consultant Open 6,500.00 0.00 2020-06-29 System Implementation 10 12 15 13 13 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-157323-CS-INDV- ELECT ESC161-2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de eléctrica IBRD / 86750 Post Consultant Open 3,700.00 0.00 2020-06-29 System Implementation 10 12 15 13 12 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-157334-CS-INDV- SANIT ESC161 2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de sanitaria IBRD / 86750 Post Consultant Open 2,200.00 0.00 2020-06-29 System Implementation 10 12 15 13 13 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-157335-CS-INDV- AGRIM ESC161 2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de agrimensura IBRD / 86750 Post Consultant Open 900.00 0.00 2020-06-29 System Implementation 07 12 15 13 13 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-157338-CS-INDV- METRA ESC161 2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de metraje IBRD / 86750 Post Consultant Open 700.00 0.00 2020-06-29 System Implementation 10 12 15 13 12 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-182435-CS-INDV- CIVIL 114RIV 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de estructura IBRD / 86750 Post Consultant Open 6,500.00 0.00 2020-06-29 System Implementation 12 15 13 12 Escuela N° 114 Departamento Selection de Rivera UY-ANEP-182436-CS-INDV- ELECT 114RIV 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de eléctrica IBRD / 86750 Post Consultant Open 3,700.00 0.00 2020-06-29 System Implementation 12 15 13 12 Escuela N° 114 Departamento Selection de Rivera UY-ANEP-182438-CS-INDV- METRA 114RIV 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de metraje IBRD / 86750 Post Consultant Open 700.00 0.00 2020-06-29 System Implementation 12 15 13 12 Escuela N° 114 Departamento Selection de Rivera UY-ANEP-182439-CS-INDV- SANIT 114RIV 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de sanitaria IBRD / 86750 Post Consultant Open 2,200.00 0.00 2020-06-29 System Implementation 12 15 13 12 Escuela N° 114 Departamento Selection de Rivera UY-ANEP-184946-CS-INDV- INST BOMBERO2020 / Individual Monitoring and Evaluation Pending 2020-08- 2020-08- 2020-09- 2020-10- Escuelas 6 de Tacuarembó - IBRD / 86750 Post Consultant Open 3,400.00 0.00 2020-07-27 System Implementation 09 12 10 10 Asesor de instalaciones de Selection protección contra incendios UY-ANEP-185628-CS-INDV- INST BOMBEROS2020 / Individual Escuelas 224 Y 9 de Monitoring and Evaluation Under 2020-11- 2020-08- 2020-11- 2020-08- 2020-11- 2020-09- 2020-10- IBRD / 86750 Post Consultant Open 6,700.00 0.00 2020-07-27 Montevideo - Asesor de System Implementation 03 09 13 12 23 10 10 Selection instalaciones de protección contra incendios UY-ANEP-185632-CS-INDV- INST BOMBEROS2020 / Individual Escuela 301 Marindia Monitoring and Evaluation Pending 2020-08- 2020-08- 2020-09- 2020-10- IBRD / 86750 Post Consultant Open 3,400.00 0.00 2020-07-27 Canelones - Asesor de System Implementation 09 12 10 10 Selection instalaciones de protección contra incendios UY-ANEP-185633-CS-INDV- INST BOMBEROS2020 / Individual Monitoring and Evaluation Pending 2020-08- 2020-08- 2020-09- 2020-10- Escuela 114 de Rivera - IBRD / 86750 Post Consultant Open 3,400.00 0.00 2020-07-27 System Implementation 09 12 10 10 Asesor de instalaciones de Selection protección contra incendios Page 13 UY-ANEP-185634-CS-INDV- INST BOMBEROS2020 / Individual Monitoring and Evaluation Under 2021-05- 2020-08- 2020-08- 2020-09- 2020-10- Escuela 161 Montevideo - IBRD / 86750 Post Consultant Open 3,400.00 0.00 2020-07-27 System Implementation 10 09 12 10 10 Asesor de instalaciones de Selection protección contra incendios UY-ANEP-185649-CS-INDV- SANITARIO 2020 / Escuelas 131, 151 Mdeo y 9 Colonia - Individual Monitoring and Evaluation 2020-08- 2020-08- 2020-09- 2020-10- Contratación de un Consultor IBRD / 86750 Post Consultant Open 6,600.00 0.00 Canceled 2020-07-27 System 09 12 10 10 para Proyecto de sanitaria en Selection las obras en las Escuelas de referencia UY-ANEP-190084-CS-INDV- PSICOMETRIA 2020 / Individual Monitoring and Evaluation Under 2020-10- 2020-09- 2020-10- 2020-09- 2020-10- 2021-03- Consultor en Piscometría con IBRD / 86750 Post Consultant Open 12,000.00 0.00 2020-08-24 System Implementation 13 14 19 16 02 31 especialización en medición Selection de aprendizajes UY-ANEP-193305-CS-CDS- LIC NUTRICION / Licenciada Isabel Aldabe - Consultor especializado en Nutrición Individual para contribuir a mejorar y Monitoring and Evaluation 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2021-09- IBRD / 86750 Post Consultant Direct 29,000.00 2,455.79 Signed 2020-09-10 fortalecer el Programa de System 09 10 10 26 30 30 30 Selection Alimentación Escolar (PAE) en los aspectos relacionados con la eficiencia, eficacia y profesionalización del mismo. UY-ANEP-197261-CS-INDV RAPETTI 2020 / Ajuste proyecto de Calculo y estructura realizado en el año 2014 por el Ing. Daniel Individual Monitoring and Evaluation 2020-09- 2020-09- 2020-09- 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2020-12- Rapetti para el reciclaje del IBRD / 86750 Post Consultant Direct 1,500.00 1,353.03 Completed 2020-09-30 System 30 30 30 30 03 30 17 31 11 Liceo N° 34 a transformarse Selection en el Instituto de Formación en Servicio, por cambios solicitados por la Unidad de Protección de Patrimonio. UY-ANEP-218444-CS-INDV CIVIL 5 FLORIDA / Asesor para Individual Monitoring and Evaluation Pending 2021-02- 2021-03- 2021-04- 2021-05- Proyecto de estructura para la IBRD / 86750 Post Consultant Open 6,500.00 0.00 2021-02-15 System Implementation 28 03 01 01 Escuela 5 Florida, Selection Departamento FLORIDA UY-ANEP-218446-CS-INDV AGRIM 5 FLORIDA / Asesor Individual Monitoring and Evaluation Pending 2021-02- 2021-03- 2021-04- 2021-05- para proyecto de agrimensura IBRD / 86750 Post Consultant Open 900.00 0.00 2021-02-15 System Implementation 28 03 01 01 Escuela N° 5 Florida, Selection Departamento de FLORIDA UY-ANEP-218447-CS-INDV- METRAJE 5 FLORIDA / Asesor Individual Monitoring and Evaluation Pending 2021-02- 2021-03- 2021-04- 2021-05- para metraje Escuela N° 5 IBRD / 86750 Post Consultant Open 700.00 0.00 2021-02-15 System Implementation 28 03 01 01 Florida, Departamento de Selection FLORIDA UY-ANEP-218448-CS-INDV CIVIL 131 MDEO / Asesor para Individual Monitoring and Evaluation Under 2021-04- 2021-05- 2021-05- 2021-06- 2021-07- Proyecto de estructura para la IBRD / 86750 Post Consultant Open 6,500.00 0.00 2021-04-30 System Implementation 21 13 16 14 14 Escuela 131 Departamento de Selection Montevideo UY-ANEP-218449-CS-INDV Individual METRAJE 131 MDEO / Asesor Monitoring and Evaluation Under 2021-05- 2021-05- 2021-05- 2021-06- 2021-07- IBRD / 86750 Post Consultant Open 700.00 0.00 2021-04-30 para metraje Escuela N° 131 System Implementation 07 13 16 14 14 Selection Departamento de Montevideo UY-ANEP-218451-CS-INDV CIVIL 4 MDEO / Asesor para Individual Monitoring and Evaluation 2021-06- 2021-05- 2021-05- 2021-06- 2021-07- Proyecto de estructura para la IBRD / 86750 Post Consultant Open 6,500.00 0.00 Under Review 2021-04-30 System 18 13 16 14 14 Escuela 4 Departamento de Selection Montevideo UY-ANEP-218452-CS-INDV Individual METRAJE 4 MDEO / Asesor Monitoring and Evaluation Pending 2021-05- 2021-05- 2021-06- 2021-07- IBRD / 86750 Post Consultant Open 700.00 0.00 2021-04-30 para metraje Escuela N° 4 System Implementation 13 16 14 14 Selection Departamento de Montevideo UY-ANEP-218453-CS-INDV BOMBERO 2 R.NEGRO / Asesor Individual de instalaciones de protección Monitoring and Evaluation Pending 2021-08- 2021-08- 2021-09- 2021-10- IBRD / 86750 Post Consultant Open 3,400.00 0.00 2021-08-02 contra incendios Escuela N° 2 System Implementation 15 18 16 16 Selection Fray Bentos, Departamento de Río Negro. UY-ANEP-222791-CS-CDS- COORD GRAL 2021-22 / Contratación de la Monitoring and Evaluation 2020-12- 2020-12- 2020-12- 2021-01- 2021-01- 2022-05- Coordinadora General para el IBRD / 86750 Post Direct Selection Direct 65,000.00 32,823.31 Signed 2020-12-15 System 15 15 15 25 25 31 Proyecto, designada por las Autoridades del CODICEN previsto hasta mayo 2022 UY-ANEP-228349-CS-CDS- COORD FS 2021-2022 / Individual Monitoring and Evaluation Under 2021-04- 2021-04- 2021-05- 2021-05- 2022-05- Coordinador del Componente IBRD / 86750 Post Consultant Open 43,000.00 0.00 2021-04-12 System Implementation 15 23 03 03 31 Formación en Servicio desde Selection abril 2021 a mayo 2022 UY-ANEP-156787-CS-INDV- SANIT ESC 9 MDEO / Individual Monitoring and Evaluation 2020-07- 2020-07- 2020-08- 2020-09- Contratación Asesor para IBRD / 86750 Post Consultant Open 2,200.00 0.00 Canceled 2020-06-29 System 12 15 13 12 Proyecto de sanitaria para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-234484-CS-INDV CIVIL 9 DURAZNO / Cateo, Individual Monitoring and Evaluation Under 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- análisis y diagnóstico IBRD / 86750 Post Consultant Open 3,500.00 0.00 2021-06-01 System Implementation 27 14 17 16 16 estructural de los perfiles del Selection techo del local escolar. UY-ANEP-234523-CS-INDV LUIS BELORA 2021 / Especialista en discapacidad intelectual- 9 jornadas con Individual Formadores del Componente Monitoring and Evaluation Under 2021-05- 2021-05- 2021-05- 2021-05- 2021-12- IBRD / 86750 Post Consultant Direct 3,300.00 0.00 2021-05-17 3 de PAEPU y maestros , System Implementation 27 17 24 24 31 Selection directores e inspectores de Educación Primaria de ETC, con énfasis en el rezago y la transición . UY-ANEP-234486-CS-INDV A, CERUTTI 2021 / Contratación directa experta en psicomotricidad que Individual Monitoring and Evaluation Under 2021-05- 2021-05- 2021-05- 2021-05- 2021-12- participara en 10 jornadas IBRD / 86750 Post Consultant Direct 8,600.00 0.00 2021-05-17 System Implementation 27 17 24 24 31 entre los meses de mayo a Selection diciembre 2021 dirigido a Inspectores, Directores y maestros de ETC. Page 14 PROCUREMENT PLAN Project information: Mozambique, Smallholder Irrigated Agriculture and Market Access Project, Grant Number D3510-MZ. Project Implementation agency: Ministry of Agriculture and Food Security-AIMU-Agriculture Investment Management Unit. Date of the Procurement Plan: April 5, 2019. Period covered by this Procurement Plan:18 (Eighteen months) Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Mozambique Procurement Regulations, Decree 5/2016 of March 8, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable . PROCUREMENT Mozambique : Smallholder Irrigated Agriculture and Market Access Project- IRRIGA 1 PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2019-04-25 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164431 GPN Date: Project Name: Smallholder Irrigated Agriculture and Market Access Project- IRRIGA 1 Loan / Credit No: IDA / D3510 NATIONAL INSTITUTE OF IRRIGATION Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MZ-INIR-174293-CW-RFB / Component 2-Smallholder Five Irrigation System Single Stage - One 2,281,957.9 2021-07- IDA / D3510 Irrigation Development and Post Request for Bids Open - National 2,690,000.00 Signed 2020-09-30 2020-08-26 2020-10-05 2020-09-02 2020-11-16 2020-09-29 2020-12-16 2020-11-16 2021-01-20 2020-12-31 Construction in Manica Envelope 8 19 Management Province MZ-INIR-174295-CW-RFB / Component 2-Smallholder Request for Single Stage - One 2021-05- Rehabilitating IRRIGA Project IDA / D3510 Irrigation Development and Post Limited 170,000.00 179,150.65 Signed 2020-10-05 2020-09-16 2020-11-30 2020-12-31 Quotations Envelope 29 Office in Zambezia Province Management MZ-INIR-174296-CW-RFB / Component 2-Smallholder Request for Single Stage - One 2021-05- Rehabilitating IRRIGA Project IDA / D3510 Irrigation Development and Post Limited 150,000.00 182,597.32 Signed 2020-10-05 2020-09-08 2020-11-30 2020-12-02 Quotations Envelope 29 Office in Manica Province Management MZ-INIR-180509-CW-RFB / Component 2-Smallholder Pending Acaboco Irrigation System 2021-08- IDA / D3510 Irrigation Development and Post Request for Bids 2,500,000.00 0.00 Implementat 2020-10-20 2020-10-25 2020-12-06 2021-01-05 2021-02-09 Construction, 314 Ha, Buzi 08 Management ion District, Sofala Province MZ-INIR-197130-CW-RFB / Component 2-Smallholder M'ziva Irrigation Ssytem Single Stage - One 1,252,617.8 2021-11- IDA / D3510 Irrigation Development and Post Request for Bids Open - National 1,300,000.00 Signed 2021-01-18 2021-01-06 2021-01-23 2021-04-29 2021-03-06 2021-02-12 2021-04-05 2021-03-05 2021-05-10 2021-04-26 Construction, 165, Nicoadala Envelope 3 06 Management District, Zambézia MZ-INIR-207153-CW-RFQ / Rehabilitation Works of Component 1-Institutional Request for Single Stage - One 2021-08- IDA / D3510 Post Limited 150,000.00 177,045.29 Signed 2020-12-23 2021-01-06 2021-02-17 2021-03-11 IRRIGA Project Offices in Beira, Capacity Building Quotations Envelope 16 Sofala Provínce MZ-INIR-180508-CW-RFB / M´ziva Irrigation System Component 2-Smallholder Single Stage - One 2021-10- Construction, 165 Ha, IDA / D3510 Irrigation Development and Post Request for Bids Open - National 1,300,000.00 0.00 Canceled 2020-12-17 2020-12-22 2021-02-02 2021-03-04 2021-04-08 Envelope 05 Nicoadala District, Zambezia Management Province MZ-INIR-227956-CW-RFQ / Under Rehabilitation Works of IRRIGA Component 1-Institutional Request for Single Stage - One 2021-12- IDA / D3510 Post Limited 100,000.00 0.00 Implementat 2021-04-28 2021-04-22 2021-06-23 Project Offices in Nampula Capacity Building Quotations Envelope 20 ion province. National MZ-INIR-207152-CW-RFB / Component 2-Smallholder Procurement Pending ACABOCO IRRIGATION Single Stage - One 2022-05- IDA / D3510 Irrigation Development and Post Request for Bids Open - National Document - 1 2,500,000.00 0.00 Implementat 2021-01-12 2021-01-17 2021-02-28 2021-03-30 2021-05-04 SYSTEM CONSTRUCTION, 314 Envelope 04 Management Envelope process ion Ha, BÚZI DISTRICT, SOFALA (Non Bank-SPD) PROVINCE National MZ-INIR-180497-CW-RFB / Component 2-Smallholder Procurement Pending Chiverano Irrigation System Single Stage - One 2022-05- IDA / D3510 Irrigation Development and Post Request for Bids Open - National Document - 1 1,000,000.00 0.00 Implementat 2021-07-13 2021-07-18 2021-08-29 2021-09-28 2021-11-02 Construction, 110 Ha, Mopeia Envelope 01 Management Envelope process ion District, Zambezia Province (Non Bank-SPD) National MZ-INIR-231415-CW-RFB / Component 2-Smallholder Procurement Pending Single Stage - One 2022-05- Reahabilitation of Tsetsera IDA / D3510 Irrigation Development and Post Request for Bids Open - National Document - 1 1,100,000.00 0.00 Implementat 2021-07-15 2021-07-20 2021-08-31 2021-09-30 2021-11-04 Envelope 03 Irrigation Schemes Management Envelope process ion (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-INIR-109235-GO-RFQ / Equipamento informático (16 Component 4- Project Under Request for Single Stage - One Computadores tipo Laptop, 6 IDA / D3510 Management and Monitoring Post Limited 78,900.00 0.00 Implementati 2019-04-16 2019-06-26 2019-06-11 2019-12-08 Quotations Envelope Datashow, 6 Impressoras e 5 and Evaluation on Video Conferencias) MZ-INIR-109256-GO-RFQ / Component 4- Project Under Request for Single Stage - One Aquisição de 5 Smart TV IDA / D3510 Management and Monitoring Post Limited 7,500.00 0.00 Implementati 2019-04-16 2019-06-26 2019-06-11 2019-12-08 Quotations Envelope (Televisores) and Evaluation on MZ-INIR-129230-GO-RFQ / Component 1-Institutional Request for Single Stage - One IDA / D3510 Post Limited 950,000.00 393,283.34 Signed 2019-09-14 2019-09-23 2019-11-09 2019-12-03 2020-05-07 Purchase of Production Kits Capacity Building Quotations Envelope MZ-INIR-129114-GO-RFB / Component 1-Institutional Single Stage - One IDA / D3510 Post Request for Bids Open - National 300,000.00 236,899.15 Signed 2019-09-09 2019-12-16 2019-09-14 2020-01-08 2019-10-26 2020-02-06 2019-11-25 2020-02-27 2019-12-30 2020-03-06 2020-06-27 Purchase of 55 Motorcycles Capacity Building Envelope MZ-INIR-139505-GO-RFQ / Aquisition of computer Component 1-Institutional Request for Single Stage - One equipment for the elaboration IDA / D3510 Post Limited 100,000.00 112,209.52 Signed 2019-10-21 2019-11-14 2019-12-16 2019-12-17 2020-06-13 Capacity Building Quotations Envelope of the integrated agrarian survey MZ-INIR-140873-GO-RFQ / Acquisition of Protective Component 1-Institutional Request for Single Stage - One Material for Extension IDA / D3510 Post Limited 100,000.00 0.00 Canceled 2019-11-02 2019-12-28 2020-06-25 Capacity Building Quotations Envelope Technicians in Manica and Sofala Provinces MZ-INIR-109253-GO-RFB / Component 4- Project Single Stage - One Aquisicao de 6 Viaturas 4X4, IDA / D3510 Management and Monitoring Post Request for Bids Open - National 240,000.00 0.00 Canceled 2019-04-11 2019-06-06 2019-04-16 2019-08-26 2019-05-28 2019-06-27 2019-08-01 2020-01-28 Envelope Dupla Cabine. and Evaluation Page 1 MZ-INIR-146499-GO-RFB / Acquisition of Protective Material for Extension Component 1-Institutional Single Stage - One IDA / D3510 Post Request for Bids Open - National 200,000.00 187,317.36 Signed 2019-11-28 2019-12-16 2019-12-03 2020-01-08 2020-01-14 2020-02-04 2020-02-13 2020-04-03 2020-03-19 2020-06-04 2020-09-15 Technicians in Manica, Sofala, Capacity Building Envelope Zambezia and Nampula Provinces MZ-INIR-146504-GO-RFB / Component 4- Project Purchase of 6 (six) 4x4 double Single Stage - One IDA / D3510 Management and Monitoring Post Request for Bids Open - National 290,000.00 333,854.45 Signed 2019-11-29 2019-12-17 2019-12-04 2020-01-08 2020-01-15 2020-02-05 2020-02-14 2020-02-13 2020-03-20 2020-02-26 2020-09-16 cab vehicles and one (01) Mini Envelope and Evaluation Bus MZ-INIR-166426-GO-RFQ / Supply and installation of integrated sound and video Component 1-Institutional Request for Single Stage - One system for the Consultative IDA / D3510 Post Limited 35,000.00 85,468.54 Signed 2020-04-15 2020-04-08 2020-06-10 2020-06-01 2020-12-07 Capacity Building Quotations Envelope Council of Meeting Room of the Ministry of Agriculture and Rural Development MZ-INIR-109262-GO-RFQ / Component 4- Project Aquisição de Software de Request for Single Stage - One IDA / D3510 Management and Monitoring Post Limited 40,000.00 29,336.14 Signed 2020-07-05 2020-06-10 2020-08-30 2020-09-14 2021-02-26 Gestão Financeira Quotations Envelope and Evaluation (Parametrização) MZ-INIR-180461-GO-RFQ / Acquisition of Information Component 1-Institutional Request for Single Stage - One IDA / D3510 Post Limited 20,000.00 23,903.10 Signed 2020-07-18 2020-07-10 2020-09-12 2020-07-23 2021-03-11 Equipment for the Fund Capacity Building Quotations Envelope Mobilization Unit MZ-INIR-180512-GO-RFB / Acquisition and Installation of Component 2-Smallholder Under Single Stage - One 6 Pivo Systems for Irrigating IDA / D3510 Irrigation Development and Prior Request for Bids Open - International 2,750,000.00 0.00 Implementati 2020-07-27 2020-08-01 2020-09-12 2020-10-12 2020-11-16 2021-05-15 Envelope 330ha, Chemba District, Management on Sofala Province MZ-INIR-206315-GO-RFQ / Pending Component 1-Institutional Request for Single Stage - One Acquisition of various graphic IDA / D3510 Post Limited 100,000.00 0.00 Implementati 2021-07-16 2021-09-10 2021-12-09 Capacity Building Quotations Envelope material on MZ-INIR-216077-GO-RFB / Under Component 1-Institutional Single Stage - One Acquisition of IT Equipment IDA / D3510 Post Request for Bids Open - National 160,000.00 0.00 Implementati 2021-07-14 2021-06-23 2021-07-29 2021-06-23 2021-09-09 2021-10-09 2021-11-28 2022-05-27 Capacity Building Envelope for PIU and PMU on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-INIR-185455-NC-RFQ / Contracting of sound, image, printing services for provincial Under Component 1-Institutional Request for Single Stage - One replicas in the ambit of the IDA / D3510 Post Limited 60,000.00 0.00 Implementati 2020-08-01 2020-09-26 2021-03-25 Capacity Building Quotations Envelope launch of the program on SUSTENTA in Manica, Sofala, Zambezia and Nampula. MZ-INIR-217221-NC-RFQ / Component 3-Agriculture Under Services Provider of the IDA / D3510 Intensification and Market Post Direct Selection Direct 35,000.00 0.00 Implementati 2021-02-14 2021-02-18 2021-02-19 2021-02-23 2021-03-26 2021-09-22 Electronic Producer Support Linkages on latform (ONE STOP SOLUTION) MZ-INIR-217227-NC-RFB / Hiring of E-vouchers Service Component 3-Agriculture Under Provider for the Irrigations Single Stage - One IDA / D3510 Intensification and Market Post Request for Bids Open - National 220,000.00 0.00 Implementati 2021-02-14 2021-03-17 2021-02-19 2021-03-31 2021-03-21 2021-04-20 2021-05-25 2022-05-25 Schemes of Manica, Sofala, Envelope Linkages on Zambezia and Nampula Provinces CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-INIR-129100-CS-QCBS / Impact Assessment and Executive Rehabilitation Component 2-Smallholder Quality And Cost- Project Preparation for some IDA / D3510 Irrigation Development and Post Open - National 300,000.00 275,000.00 Signed 2019-09-02 2019-09-19 2019-09-23 2019-12-19 2019-11-06 2020-03-19 2019-12-04 2020-05-29 2020-01-03 2020-07-22 2020-02-07 2020-08-14 2020-03-13 2020-09-30 2020-04-17 Based Selection Irrigation Systems Affected by Management IDAI Cyclone in Manica Province MZ-INIR-129103-CS-QCBS / Impact Assessment and Executive Rehabilitation Component 2-Smallholder Quality And Cost- Project Preparation for some IDA / D3510 Irrigation Development and Post Open - National 150,000.00 132,153.48 Signed 2019-09-02 2019-09-19 2019-09-23 2019-12-19 2019-11-06 2020-03-19 2019-12-04 2020-05-29 2020-01-03 2020-07-27 2020-02-07 2020-08-26 2020-03-13 2020-09-16 2020-03-16 Based Selection Irrigation Systems Affected by Management IDAI Cyclone in Sofala Province MZ-INIR-129104-CS-QCBS / Impact Assessment and Executive Rehabilitation Component 2-Smallholder Quality And Cost- Project Preparation for some IDA / D3510 Irrigation Development and Post Open - National 150,000.00 121,956.07 Signed 2019-09-02 2019-09-19 2019-09-23 2019-12-19 2019-11-06 2020-03-19 2019-12-04 2020-05-29 2020-01-03 2020-07-27 2020-02-07 2020-08-19 2020-03-13 2020-09-30 2020-04-17 Based Selection Irrigation Systems Affected by Management IDAI Cyclone in Zambezia Province MZ-INIR-129111-CS-QCBS / Irrigation Infrastructure Component 2-Smallholder Quality And Cost- Investment Pre-Feasibility and IDA / D3510 Irrigation Development and Post Open - National 200,000.00 0.00 Canceled 2019-09-09 2019-09-19 2019-09-30 2019-11-13 2019-12-11 2020-01-10 2020-02-14 2020-03-20 2020-07-18 Based Selection Feasibility Studies in Sofala Management Province. MZ-INIR-129110-CS-QCBS / Irrigation Infrastructure Component 2-Smallholder Quality And Cost- Investment Pre-Feasibility and IDA / D3510 Irrigation Development and Post Open - National 200,000.00 0.00 Canceled 2019-09-09 2019-09-19 2019-09-30 2019-11-13 2019-12-11 2020-01-10 2020-02-14 2020-03-20 2020-07-18 Based Selection Feasibility Studies in Management Zambezia Province. Page 2 MZ-INIR-129106-CS-QCBS / Irrigation Infrastructure Component 2-Smallholder Quality And Cost- Investment Pre-Feasibility and IDA / D3510 Irrigation Development and Post Open - National 200,000.00 0.00 Canceled 2019-09-09 2019-09-19 2019-09-30 2019-11-13 2019-12-11 2020-01-10 2020-02-14 2020-03-20 2020-07-18 Based Selection Feasibility Studies in Nampula Management Province. MZ-INIR-129112-CS-QCBS / Irrigation Infrastructure Component 2-Smallholder Quality And Cost- Investment Pre-Feasibility and IDA / D3510 Irrigation Development and Post Open - National 200,000.00 0.00 Canceled 2019-09-09 2019-09-19 2019-09-30 2019-11-13 2019-12-11 2020-01-10 2020-02-14 2020-03-20 2020-07-18 Based Selection Feasibility Studies in Manica Management Province. MZ-INIR-146515-CS-CQS / Contracting a company to Component 4- Project Consultant recruit technicians for the IDA / D3510 Management and Monitoring Post Qualification Open - National 100,000.00 0.00 Canceled 2019-12-23 2019-12-17 2020-01-13 2020-02-26 2020-03-27 2020-05-01 2020-10-28 IRRIGA Project at central and and Evaluation Selection provincial levels MZ-INIR-146523-CS-QCBS / Irrigation infrastructure investment Pre-feasibility and Feasibility Studies and elaboration of executive Component 2-Smallholder Quality And Cost- projects for IDA / D3510 Irrigation Development and Prior Open - International 750,000.00 0.00 Canceled 2019-12-23 2020-02-11 2020-01-13 2020-02-26 2020-03-25 2020-04-24 2020-05-29 2020-07-03 2021-07-03 Based Selection construction/rehabilitation of Management 750 hectares of irrigation systems in Nampula province and Supervision of the respective works MZ-INIR-146521-CS-QCBS / Irrigation infrastructure investment Pre-feasibility and Feasibility Studies and elaboration of executive Component 2-Smallholder Quality And Cost- projects for IDA / D3510 Irrigation Development and Prior Open - International 750,000.00 0.00 Canceled 2019-12-23 2020-02-11 2020-01-13 2020-02-26 2020-03-25 2020-04-24 2020-05-29 2020-07-03 2021-07-03 Based Selection construction/rehabilitation of Management 750 hectares of irrigation systems in Zambezia province and Supervision of the respective works MZ-INIR-146520-CS-QCBS / Irrigation infrastructure investment Pre-feasibility and Feasibility Studies and elaboration of executive Component 2-Smallholder Quality And Cost- projects for IDA / D3510 Irrigation Development and Prior Open - International 750,000.00 0.00 Canceled 2019-12-23 2020-02-11 2020-01-13 2020-02-26 2020-03-25 2020-04-24 2020-05-29 2020-07-03 2021-07-03 Based Selection construction/rehabilitation of Management 750 hectares of irrigation systems in Manica province and Supervision of the respective works MZ-INIR-146518-CS-QCBS / Irrigation infrastructure investment Pre-feasibility and Feasibility Studies and elaboration of executive Component 2-Smallholder Quality And Cost- projects for IDA / D3510 Irrigation Development and Prior Open - International 750,000.00 0.00 Canceled 2019-12-23 2020-02-11 2020-01-13 2020-02-26 2020-03-25 2020-04-24 2020-05-29 2020-07-03 2021-07-03 Based Selection construction/rehabilitation of Management 750 hectares of irrigation systems in Sofala province and Supervision of the respective works MZ-INIR-183480-CS-CQS / Component 2-Smallholder Consultant Munda Munda Irrigation IDA / D3510 Irrigation Development and Post Qualification Limited 360,000.00 290,377.40 Signed 2020-07-30 2020-07-15 2020-08-13 2020-07-15 2020-09-12 2020-08-19 2020-10-17 2020-10-07 2021-04-15 System Supervision Management Selection MZ-INIR-180472-CS-QCBS / Component 2-Smallholder Five Irrigation System Quality And Cost- IDA / D3510 Irrigation Development and Post Open - National 270,000.00 244,915.65 Signed 2020-08-31 2020-08-26 2020-09-21 2020-11-25 2020-11-04 2020-12-22 2020-12-02 2021-01-27 2021-01-01 2021-03-24 2021-02-05 2021-03-18 2021-03-12 2021-04-27 2022-03-12 Supervision in Manica Based Selection Management Province MZ-INIR-180481-CS-CQS / Component 2-Smallholder Consultant Environmental Audit of IDA / D3510 Irrigation Development and Post Qualification Limited 90,000.00 94,851.91 Signed 2020-08-31 2020-08-03 2020-09-14 2020-08-03 2020-10-14 2021-03-24 2020-11-18 2021-05-05 2021-05-17 PROIRRI irrigations Management Selection MZ-INIR-180484-CS-CQS / Component 2-Smallholder Consultant Resettlement Action Plan IDA / D3510 Irrigation Development and Post Qualification Limited 50,000.00 126,181.54 Signed 2020-08-31 2020-08-03 2020-09-14 2020-08-03 2020-10-14 2021-02-11 2020-11-18 2021-04-08 2021-05-17 (PAR) for the Chirimonio - Management Selection ACABOCO Irrigation MZ-INIR-180476-CS-QCBS / Component 2-Smallholder Quality And Cost- Munda Munda Irrigation IDA / D3510 Irrigation Development and Post Open - National 360,000.00 0.00 Canceled 2020-07-20 2020-07-15 2020-08-10 2020-09-23 2020-10-21 2020-11-20 2020-12-25 2021-01-29 2022-01-29 Based Selection System Supervision Management MZ-INIR-185302-CS-QCBS / 750 ha Irrigation Component 2-Smallholder Quality And Cost- Infrastructure Projection and IDA / D3510 Irrigation Development and Post Open - International 750,000.00 0.00 Canceled 2020-08-31 2020-08-18 2020-09-21 2020-11-04 2020-12-02 2021-01-01 2021-02-05 2021-03-12 2022-03-12 Based Selection Its Construction Supervision Management in Manica Province MZ-INIR-185308-CS-QCBS / 750 ha Irrigation Component 2-Smallholder Quality And Cost- Infrastructure Projection and IDA / D3510 Irrigation Development and Post Open - International 750,000.00 0.00 Canceled 2020-08-31 2020-08-18 2020-09-21 2020-11-04 2020-12-02 2021-01-01 2021-02-05 2021-03-12 2022-03-12 Based Selection Its Construction Supervision Management in Nampula Province MZ-INIR-185306-CS-QCBS / 750 ha Irrigation Component 2-Smallholder Quality And Cost- Infrastructure Projection and IDA / D3510 Irrigation Development and Post Open - International 750,000.00 0.00 Canceled 2020-08-31 2020-08-18 2020-09-21 2020-11-04 2020-12-02 2021-01-01 2021-02-05 2021-03-12 2022-03-12 Based Selection Its Construction Supervision Management in Zambezia Province MZ-INIR-185305-CS-QCBS / 750 ha Irrigation Component 2-Smallholder Quality And Cost- Infrastructure Projection and IDA / D3510 Irrigation Development and Post Open - International 750,000.00 0.00 Canceled 2020-08-31 2020-08-18 2020-09-21 2020-11-04 2020-12-02 2021-01-01 2021-02-05 2021-03-12 2022-03-12 Based Selection Its Construction Supervision Management in Sofala Province Page 3 MZ-INIR-189875-CS-CQS / IRRIGA Project Office Component 2-Smallholder Consultant Rehabilitation Works IDA / D3510 Irrigation Development and Post Qualification Limited 35,000.00 84,296.31 Signed 2020-09-15 2020-09-23 2020-09-29 2020-10-01 2020-10-29 2021-04-26 2020-12-03 2021-04-27 2021-06-01 Supervision in Manica and Management Selection Zambezia Provinces MZ-INIR-197081-CS-QCBS / Manica and Sofala 1 500 ha Component 2-Smallholder Quality And Cost- Under Irrigation Infrastructure IDA / D3510 Irrigation Development and Prior Open - International 1,500,000.00 0.00 2020-10-12 2020-10-06 2020-11-02 2020-10-30 2021-01-16 2021-02-15 2021-03-17 2021-04-21 2021-05-26 2022-05-26 Based Selection Implementation Projection and Its Management Construction Supervision MZ-INIR-197082-CS-QCBS / Zambézia and Nampula 1 500 Component 2-Smallholder Quality And Cost- Under ha Irrigation Infrastructure IDA / D3510 Irrigation Development and Prior Open - International 1,500,000.00 0.00 2020-10-12 2020-10-01 2020-11-02 2020-10-30 2021-01-16 2021-02-15 2021-03-17 2021-05-07 2021-06-11 2022-06-11 Based Selection Implementation Projection and Its Management Construction Supervision MZ-INIR-197084-CS-CQS / Component 4- Project Consultant Supervision Construction Under IDA / D3510 Management and Monitoring Post Qualification Open - National 130,000.00 0.00 2020-12-14 2021-01-04 2021-01-04 2021-02-09 2021-02-17 2021-03-19 2021-04-23 2021-10-20 Works for Mziva Irrigation Implementation and Evaluation Selection System MZ-INIR-197087-CS-CQS / Component 4- Project Consultant Supervision Construction IDA / D3510 Management and Monitoring Post Qualification Open - National 100,000.00 0.00 Canceled 2020-10-19 2020-11-09 2020-12-23 2021-01-22 2021-02-26 2021-08-25 Works for CRIDF Irrigation and Evaluation Selection System MZ-INIR-206197-CS-QCBS / Service provider for training Component 3-Agriculture and coordination of farmer Quality And Cost- Under IDA / D3510 Intensification and Market Post Open - National 350,000.00 0.00 2020-12-15 2021-01-07 2021-01-14 2021-03-17 2021-03-15 2021-04-12 2021-05-12 2021-06-16 2021-07-21 2022-07-21 associations with acess to the Based Selection Implementation Linkages market in Intabo irrigation scheme in Zambézia province MZ-INIR-206312-CS-LCS / Development and Installation of an Electronic Platform Component 4- Project (online) for the Least Cost Under IDA / D3510 Management and Monitoring Post Open - National 60,000.00 0.00 2020-12-21 2021-01-07 2021-01-11 2021-06-08 2021-02-24 2021-03-24 2021-04-23 2021-05-28 2021-07-02 2021-07-05 implementation of the and Selection Implementation and Evaluation Complaints Management Mechanism of the IRRIGA Project. MZ-INIR-206919-CS-CQS / Risk Analysis of Gender-Based Component 3-Agriculture Consultant Violence (VBG) at Project Under IDA / D3510 Intensification and Market Post Qualification Limited 70,000.00 0.00 2021-01-14 2021-01-18 2021-01-28 2021-02-27 2021-04-03 2021-09-30 Implementation Sites: Implementation Linkages Selection Development of intervention strategy and action plan MZ-INIR-215845-CS-CQS / Consultant Component 1-Institutional Irrigation Speciaslist IDA / D3510 Post Qualification Limited 36,000.00 0.00 Canceled 2021-02-28 2021-01-28 2021-03-14 2021-04-13 2021-05-18 2022-05-18 Capacity Building (Zambézia) Selection MZ-INIR-222388-CS-CQS / Supervision Services for Consultant Component 1-Institutional Under Rehabilitation Works of IDA / D3510 Post Qualification Limited 70,000.00 0.00 2021-04-16 2021-04-14 2021-04-30 2021-05-30 2021-07-04 2021-12-31 Capacity Building Implementation Nampula and Sofala IRRIGA Selection Offices Project MZ-INIR-222378-CS-QCBS / Organization and Training of Component 3-Agriculture Producers and Establishiment Quality And Cost- Pending IDA / D3510 Intensification and Market Post Open - National 200,000.00 0.00 2021-07-02 2021-07-23 2021-09-05 2021-10-03 2021-11-02 2021-12-07 2022-01-11 2023-01-11 of Market Link in the Based Selection Implementation Linkages Irrigations Schemes in Sofala Provínce INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-INIR-109288-CS-INDV / Individual Component 1-Institutional Especialista em Procurement IDA / D3510 Prior Consultant Open 90,000.00 0.00 Canceled 2019-04-05 2019-05-24 2019-06-14 2019-07-19 2020-01-15 Capacity Building (baseado em Maputo) Selection MZ-INIR-129523-CS-CDS / Surveying damage caused by IDAI Cyclone and preparing Component 2-Smallholder the Executive Acaboco IDA / D3510 Irrigation Development and Post Direct Selection Direct 45,000.00 50,000.00 Signed 2019-09-02 2019-09-19 2019-09-12 2019-09-30 2019-11-16 2019-12-30 2019-12-16 Irrigation System Works Management Completion Project, 316 ha, Buzi District, Sofala Province MZ-INIR-129528-CS-CDS / Surveying damage caused by IDAI Cyclone and preparing Component 2-Smallholder the Executive Mziva and IDA / D3510 Irrigation Development and Post Direct Selection Direct 90,000.00 90,000.00 Signed 2019-09-02 2019-09-19 2019-09-12 2019-09-30 2019-11-16 2019-12-18 2019-12-16 Chiverano Irrigation System Management Works Completion Project, Zambeze Province MZ-INIR-139499-CS-INDV / Component 3-Agriculture Individual Hire a consultant to boost the IDA / D3510 Intensification and Market Post Consultant Limited 30,000.00 0.00 Canceled 2019-10-14 2019-10-19 2019-11-09 2019-12-14 2020-06-11 2019/2020 agricultural Linkages Selection company in Manica Province MZ-INIR-139496-CS-INDV / Hire a consultant to boost the Component 3-Agriculture Individual 2019/2020 agricultural IDA / D3510 Intensification and Market Post Consultant Limited 35,000.00 0.00 Canceled 2019-10-14 2019-10-19 2019-11-09 2019-12-14 2020-06-11 company in Sofala and Linkages Selection Zambezia Provinces MZ-INIR-140872-CS-CDS / Service provider for the preparation of PEDSA II and Component 2-Smallholder PNISA II as part of the IDA / D3510 Irrigation Development and Post Direct Selection Direct 300,000.00 0.00 Canceled 2019-12-10 2019-12-20 2020-02-23 2020-08-21 institutional support to DPCI. Management Services performed via UN system. Page 4 Individual MZ-INIR-150739-CS-INDV / Component 1-Institutional IDA / D3510 Prior Consultant Limited 72,000.00 0.00 Canceled 2019-12-22 2020-02-11 2019-12-27 2020-02-13 2020-01-17 2020-02-21 2020-08-19 Procurement Specialist Capacity Building Selection MZ-INIR-153140-CS-CDS / Component 3-Agriculture Service Provider for Operation IDA / D3510 Intensification and Market Post Direct Selection Direct 180,000.00 199,447.47 Signed 2020-01-26 2020-01-17 2020-02-05 2020-01-22 2020-04-10 2020-03-30 2020-10-07 of da Paz Irrigation in Linkages Zambezia Province Individual MZ-INIR-167041-CS-INDV / Component 1-Institutional IDA / D3510 Prior Consultant Open 72,000.00 52,500.00 Signed 2020-05-18 2020-05-05 2020-07-06 2020-07-22 2020-07-27 2020-08-18 2020-08-31 2020-09-15 2021-02-27 Procurement Specialist Capacity Building Selection MZ-INIR-175070-CS-CDS / Organising and Building Component 3-Agriculture Capacity of Producers and IDA / D3510 Intensification and Market Post Direct Selection Direct 100,000.00 130,950.00 Signed 2020-06-30 2020-06-30 2020-07-10 2020-06-10 2020-09-13 2020-08-05 2021-03-12 Establishing Market Linkages Linkages in Manica Province MZ-INIR-178882-CS-INDV / Individual Component 1-Institutional Monitoring and Evaluation IDA / D3510 Post Consultant Limited 57,600.00 57,600.00 Signed 2020-07-13 2020-06-24 2020-07-18 2020-06-24 2020-08-08 2020-06-30 2020-09-12 2020-07-01 2021-03-11 Capacity Building Specialist Selection MZ-INIR-178865-CS-INDV / Individual Component 1-Institutional Funds Mobilization Unit IDA / D3510 Post Consultant Limited 144,000.00 144,000.00 Signed 2020-07-13 2020-06-24 2020-07-18 2020-06-24 2020-08-08 2020-06-29 2020-09-12 2020-07-01 2021-03-11 Capacity Building Coordinator Selection MZ-INIR-178878-CS-INDV / Individual Component 1-Institutional Funds Mobilization Unit IDA / D3510 Post Consultant Limited 57,600.00 57,600.00 Signed 2020-07-13 2020-06-24 2020-07-18 2020-08-05 2020-08-08 2020-08-20 2020-09-12 2020-08-20 2021-03-11 Capacity Building Environment Management Selection MZ-INIR-178874-CS-INDV / Individual Component 1-Institutional Funds Mobilization Unit IDA / D3510 Post Consultant Limited 57,600.00 57,600.00 Signed 2020-07-13 2020-06-24 2020-07-18 2020-06-24 2020-08-08 2020-06-30 2020-09-12 2020-07-01 2021-03-11 Capacity Building Finance Management Selection Individual MZ-INIR-178872-CS-INDV / Component 1-Institutional IDA / D3510 Post Consultant Limited 72,000.00 72,000.00 Signed 2020-07-13 2020-06-24 2020-07-18 2020-06-24 2020-08-08 2020-06-29 2020-09-12 2020-07-01 2021-03-11 P4R Unit Coordinator Capacity Building Selection Individual MZ-INIR-109291-CS-INDV / Component 1-Institutional IDA / D3510 Prior Consultant Direct 36,000.00 0.00 Canceled 2019-05-23 2019-06-02 2019-06-23 2019-07-28 2020-01-24 Procurement Assistant Capacity Building Selection MZ-INIR-197120-CS-INDV / Individual Consultant for Component 2-Smallholder Individual project design and Pending IDA / D3510 Irrigation Development and Post Consultant Limited 180,000.00 0.00 2020-12-10 2020-12-30 2021-01-19 2021-02-23 2022-03-20 supervision for supply and Implementation Management Selection installation of the Chemba irrigation system Individual MZ-INIR-206913-CS-INDV / Component 1-Institutional IDA / D3510 Prior Consultant Direct 36,000.00 36,000.00 Signed 2020-12-07 2021-01-12 2020-12-17 2021-03-15 2021-01-07 2021-04-11 2021-02-11 2021-04-16 2022-02-11 Procurement Assistant Capacity Building Selection Individual MZ-INIR-215703-CS-INDV / Component 1-Institutional Under IDA / D3510 Post Consultant Open 50,000.00 0.00 2021-02-10 2021-01-28 2021-03-31 2021-04-21 2021-05-26 2021-11-22 Irrigation Specialist (UGISA) Capacity Building Implementation Selection Individual MZ-INIR-215704-CS-INDV / Component 1-Institutional Under IDA / D3510 Post Consultant Limited 100.00 0.00 2021-02-10 2021-01-28 2021-02-15 2021-03-08 2021-04-12 2021-10-09 Civil Engineer Capacity Building Implementation Selection Individual MZ-INIR-215833-CS-INDV / Component 1-Institutional IDA / D3510 Post Consultant Limited 36,000.00 0.00 Canceled 2021-02-28 2021-01-28 2021-03-05 2021-03-26 2021-04-30 2022-04-30 Irrigation Specialist (Manica) Capacity Building Selection Individual MZ-INIR-215836-CS-INDV / Component 1-Institutional IDA / D3510 Post Consultant Limited 36,000.00 0.00 Canceled 2021-02-28 2021-01-28 2021-03-05 2021-03-26 2021-04-30 2022-04-30 Irrigation Specialist (Sofala) Capacity Building Selection Individual MZ-INIR-215841-CS-INDV / Component 1-Institutional IDA / D3510 Post Consultant Limited 36,000.00 0.00 Canceled 2021-02-28 2021-01-28 2021-03-05 2021-03-26 2021-04-30 2022-04-30 Irrigation Specialist (Nampula) Capacity Building Selection MZ-INIR-215847-CS-INDV / Individual Component 1-Institutional Safeguards Specislist IDA / D3510 Post Consultant Limited 30,000.00 30,000.00 Signed 2021-02-28 2021-02-24 2021-03-05 2021-03-25 2021-03-26 2021-04-09 2021-04-30 2021-04-26 2022-04-30 Capacity Building (Zambézia) Selection MZ-INIR-215851-CS-INDV / Individual Component 1-Institutional Safeguards Specialist IDA / D3510 Post Consultant Limited 30,000.00 516.57 Signed 2021-02-28 2021-02-24 2021-03-05 2021-03-25 2021-03-26 2021-04-09 2021-04-30 2021-04-26 2022-04-30 Capacity Building (Nampula) Selection Individual MZ-INIR-215857-CS-INDV / Component 1-Institutional IDA / D3510 Post Consultant Limited 30,000.00 516.57 Signed 2021-02-28 2021-02-24 2021-03-05 2021-03-25 2021-03-26 2021-04-09 2021-04-30 2021-04-26 2022-04-30 Safeguards Specialist (Manica) Capacity Building Selection Individual MZ-INIR-215859-CS-INDV / Component 1-Institutional IDA / D3510 Post Consultant Limited 30,000.00 516.57 Signed 2021-02-28 2021-02-22 2021-03-05 2021-03-25 2021-03-26 2021-04-09 2021-04-30 2021-04-26 2022-04-30 Safeguards Specialist (Sofala) Capacity Building Selection Page 5 Procurement Plan for Project of Integrated Urban and Tourism Development I. General 1. Bank’s approval Date of the procurement Plan [Original: July 15,2016]: Revision 1 of Updated Procurement Plan, May 2017 2. Date of General Procurement Notice: April 26, 2017 3. Period covered by this procurement plan: The procurement period of project covered from year May 2017 to October 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Expenditur Contract Procurement Bank Prior Review e Category Value Method (USD) >= ICB All >/=US$10 million 5,000,000 contracts < NCB First contract Civil Works 5,000,000 <200,000 Shopping First contract NA DC US$60,000 >= ICB All >/=US$1million 1,000,000 contracts Goods <1,000,000 NCB First contract <100,000 Shopping First contract NA DC US$60,000 4. Reference to (if any) Project Operational/Procurement Manual: Project Operational Manual for World Bank Loan Project P155875 PIUDT issued by Albanian Development Fund on 24.04.2017 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 Domestic Review Comme Ref. No. Description Packages Preference by Bank nts (yes/no) (Prior/Post) Summary of the ICB 2 No (Works) Berat Town of AL- integrated ADF15547- Prior Urban CW-RFB upgrading Saranda tourism gateway C1W-S3 No Prior integrated urban upgrading Summary of the NCB 14 No Post (Works) Saranda AL- staircase ADF15534- No Post rehabilitation CW-RFB Project Urban Regeneration of the AL- existing ADF15536- No Post promenade CW-RFB “Naim Frasheri” in Saranda Ali Pasha AL- historic trail ADF15538- and slopes No Post CW-RFB stabilization – Gjirokastra Street AL- lightening ADF15539- historic No Post CW-RFB center – Gjirokstra AL- Bazaar coble ADF15540- stone roads No Post CW-RFB rehabilitation Gjirokastra AL- museum city ADF15541- integrated No Post CW-RFB urban upgrading Upgrading AL- the ADF15536- renovation of No Post CW-RFB systems of museums Rehabilitation of AL- Cobblestone ADF28554- No Prior road “Mihal CW-RFB Komneno”, Berat castle Upgrading to AL- vehicle ADF15545- No Post access road CW-RFB “Muzak Topia”, Berat Castle Visual No AL- upgrading of ADF15542- selected Post CW-RFB heritage landscape AL- Street ADF15548- lightening – No Post CW-RFB Permet Permet AL- integrated ADF15549- No Post urban CW-RFB upgrading Integrated AL- upgrading of ADF15550- No Post selected CW-RFB touristic area Tourism AL- Product ADF15551- development No Post CW-RFB in 4 municipalities Summary of the NCB 6 No Post (Goods) Solid waste AL-ADF- equipment 15581-GO- for Himara No Prior RFB transfer station Solid W AL-ADF- collection 15582-GO- equipment(Gjir No Post RFB okastra/other as needed Financial AL-ADF- Management 15583-GO- Equipment No Post RFB for 4 municipalities Asset AL-ADF- Management 15609-GO- Equipment No Post RFB for 4 municipalities GIS AL-ADF- equipment 15584-GO- and licenses No Post RFB for 4 municipalities Equipment for tourism AL-ADF- information 15586-GO- No Post management RFB and statistic improvement Summary of the SH 4 No Post (Goods) Equipment AL-ADF- for local 15585-GO- destination No Prior RFB management entities Office equipment AL-ADF- and licenses 15588-GO- No Post for project RFB implementati on Purchase of AL-ADF- additional 44382-GO- accessories No Post RFB for smart board of ADF AL-ADF- 44382-GO- Vehicles No Post RFB III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: QCBS, QBS, FBS, >/= USD 500,000 ; NA Consultant LCS and CQS* >=US$200,000 for IC Services NA SSS and >/=US$5,000 for NA IC SSS 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 Review Ref. No. Description of Assignment Comme Packages by Bank nts (Prior/ Post) Summary of QCBS 8 AL-ADF- Concept, Design and Supervision 44317-CS- of Saranda Urban Upgrading (line Post QCBS 3) AL-ADF- Concept, Design and Supervision 39736-CS- Urban Upgrading Gjirokastra (line Post QCBS 7) Concept, Design and Supervision AL-ADF- of the Berat and Permet 31055-CS- Post Integrated Urban Upgrading (line QCBS 12 and14) Site Management, Detailed AL-ADF- design and construction 15563-CS- Prior supervision for Infrastructure of QCBS IUTS AL-ADF- Market Research & Development 15567-CS- Strategy for the South of Albania Post QCBS & four municipalities Market Development for the AL-ADF- South of Albania (Tourism 15568-CS- Prior products promotion, line 16 and QCBS component 2 works) AL-ADF- Tourism Product and value chain 15570-CS- development in selected Prior QCBS municipalities (line 16) AL-ADF- Guesthouse branding and market 44317-CS- Prior delivery QCBS Summary of CQS 9 Post AL-ADF- Design and Supervision 15556-CS- Gjirokastra system of museums Post CQS (line 8) AL-ADF- Supervision of fast truck 37871-CS- Post subproject Berat & Permet CQS AL-ADF- Supervision of fast truck 37532-CS- Post subproject Gjirokastra & Saranda CQS Detailed design and construction AL-ADF- supervision for Infrastructure for 15562-CS- Post Viewpoints along the touristic CQS circuit AL-ADF- Asset Management system - 15565-CS- assessment and technical Post CQS specification for goods (line 43) AL-ADF- Geographic Information Systems 15566-CS- - assessment and technical Post CQS specification for goods (line 44) Tourism Information AL-ADF- Management system and 15574-CS- Statistics Improvement - Post CQS assessment and technical specification of goods (line 46) AL-ADF- 15580-CS- Results Assessment (M&E) Post INDV AL-ADF- Design and urban regeneration 15557-CS- of the existing promenade “Naim Post CQS Frasheri”, Sarande Summary of IC 7 Post International expert on AL-ADF- conservation and structural 15559-CS- Post restoration of monuments and INDV historic buildings. (line 4) Financial Management Systems - AL-ADF- assessment and technical 15566-CS- Post specifications for goods. (line INDV 42) AL-ADF- Project Coordinator - Urban 15576-CS- Prior Specialist PCU INDV AL-ADF- 15576-CS- Tourism Specialist - PCU Prior INDV AL-ADF- 15577-CS- Architect - PCU Prior INDV AL-ADF- 15578-CS- Cultural Heritage Consultant Post INDV AL-ADF- 15579-CS- Site Management Consultant Post INDV PROCUREMENT Albania : Project for Integrated Urban and Tourism Development (PIUTD) PLAN General Information Country: Albania Bank’s Approval Date of the Original Procurement Plan: 2017-05-22 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155875 GPN Date: 2017-05-23 Project Name: Project for Integrated Urban and Tourism Development (PIUTD) Loan / Credit No: IBRD / 86560 A Executing Agency(ies): lbanian Development Fund WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AL-ADF-15534-CW-RFB / Component 1: Urban Single Stage - One 2018-02- Saranda Staircase IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 894,776.70 Signed 2017-05-19 2017-07-17 2017-05-24 2017-07-05 2017-08-30 2017-08-04 2017-09-08 2017-12-15 Envelope 08 Rehabilitation Project Improvement AL-ADF-15543-CW-RFB / Component 1: Urban Rehabilitation of Cobblestone Single Stage - One 2018-02- IBRD / 86560 Upgrading and Infrastructure Prior Request for Bids Open - National 0.00 Canceled 2017-05-18 2017-05-23 2017-07-04 2017-08-03 2017-09-07 Road "Mihal Komneno" to Envelope 07 Improvement Berat castle AL-ADF-16753-CW-RFB / Component 1: Urban Rehabilitation of Cobblestone Single Stage - One 2018-03- IBRD / 86560 Upgrading and Infrastructure Prior Request for Bids Open - National 0.00 Canceled 2017-06-02 2017-06-28 2017-06-07 2017-07-19 2017-08-18 2017-09-22 Road "Mihal Komneno" to Envelope 21 Improvement Berat castle AL-ADF-28554-CW-RFB / Component 1: Urban Under Rehabilitimi i rrugës hyrëse Single Stage - One 2018-07- IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 0.00 Implementat 2017-09-14 2017-09-21 2017-09-19 2017-09-25 2017-10-31 2017-11-10 2017-11-30 2018-01-04 "Mihal Komneno" për në Kala Envelope 03 Improvement ion dhe Tabja AL-ADF-15545-CW-RFB / Component 1: Urban Upgrading of vehicle access Single Stage - One 2,685,893.1 2019-01- IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National Signed 2018-03-01 2018-03-06 2018-04-17 2018-05-25 2018-05-17 2018-06-20 2018-06-21 2018-11-14 road "Muzak Topia" to Berat Envelope 3 19 Improvement castle AL-ADF-15540-CW-RFB / Component 1: Urban Single Stage - One 2019-05- Bazaar cobble stone roads IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 0.00 Canceled 2018-02-28 2018-03-05 2018-04-16 2018-03-05 2018-05-16 2018-06-20 Envelope 20 rehabilitation Improvement Component 1: Urban AL-ADF-15548-CW-RFB / Single Stage - One 2018-10- IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 0.00 Canceled 2018-03-29 2018-04-03 2018-05-15 2018-06-14 2018-07-19 Street lighting - Permet Envelope 18 Improvement AL-ADF-15550-CW-RFB / Pending Component 2: Touristic Sites Single Stage - One 2021-02- Integrated upgrading of IBRD / 86560 Post Request for Bids Open - National 0.00 Implementat 2019-04-16 2019-04-21 2019-06-02 2019-07-02 2019-08-06 Upgrading Envelope 02 selected touristic sites. ion AL-ADF-62551-CW-RFB / Component 1: Urban Under Single Stage - One 2019-03- Bazaar cobblestone roads IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 0.00 Implementat 2018-05-15 2018-05-20 2018-07-01 2018-06-18 2018-07-31 2018-09-04 Envelope 03 rehabilitation Improvement ion Component 1: Urban AL-ADF-63100-CW-RFQ / Request for Single Stage - One 2019-01- IBRD / 86560 Upgrading and Infrastructure Post Limited 41,757.91 Signed 2018-06-04 2018-06-18 2018-07-30 2018-07-16 Street lighting - Permet Quotations Envelope 26 Improvement AL-ADF-15541-CW-RFB / Component 1: Urban Pending Single Stage - One 2021-12- Gjirokastra Museum City IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-01-06 2020-01-11 2020-02-22 2020-03-23 2020-04-27 Envelope 26 Integrated Urban Upgrading Improvement ion AL-ADF-15539-CW-RFB / Component 1: Urban Pending Single Stage - One 2020-02- Street lighting historic center IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 0.00 Implementat 2019-05-30 2019-06-04 2019-07-16 2019-08-15 2019-09-19 Envelope 19 - Gjirokastra Improvement ion AL-ADF-15542-CW-RFB / Component 1: Urban Single Stage - One 1,279,964.6 2021-05- Upgrading and renovation of IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National Signed 2019-09-16 2020-11-09 2019-09-21 2021-01-08 2019-11-02 2020-12-10 2019-12-02 2020-12-23 2020-01-06 2021-01-18 Envelope 7 07 system of museums Improvement AL-ADF-15546-CW-RFB / Component 1: Urban Pending Single Stage - One 2020-04- Visual Upgrading of selected IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 0.00 Implementat 2019-09-09 2019-09-14 2019-10-26 2019-11-25 2019-12-30 Envelope 30 heritage landscape Improvement ion AL-ADF-15549-CW-RFB / Component 1: Urban Single Stage - One 3,882,016.8 2021-05- Permet integrated urban IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National Signed 2019-10-07 2020-11-05 2019-10-12 2021-01-08 2019-11-23 2020-12-11 2019-12-23 2021-01-11 2020-01-27 2021-02-26 Envelope 2 28 upgraded Improvement AL-ADF-15551-CW-RFB / Component 3:Tourism Pending Single Stage - One 2021-12- Tourism Product development IBRD / 86560 Market and Product Post Request for Bids Open - National 0.00 Implementat 2020-01-06 2020-01-11 2020-02-22 2020-03-23 2020-04-27 Envelope 18 in 4 municpalities Development ion Pending AL-ADF-51671-CW-RFB / Component 2: Touristic Sites Single Stage - One 2020-11- IBRD / 86560 Post Request for Bids Open - National 0.00 Implementat 2020-01-15 2020-01-20 2020-03-02 2020-04-01 2020-05-06 Construction of viewpoints Upgrading Envelope 02 ion AL-ADF-15537-CW-RFB / Component 1: Urban Pending Single Stage - Two 2022-02- Saranda Tourism Gateway IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - International 0.00 Implementat 2020-01-15 2020-01-20 2020-03-02 2020-05-15 2020-06-19 Envelope 17 Integrated Urban Upgrading. Improvement ion AL-ADF-15547-CW-RFB / Component 1: Urban Under Single Stage - Two 2021-09- Berat Town of Integrated IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - International 0.00 Implementat 2019-09-16 2021-02-17 2019-09-21 2019-11-02 2020-01-15 2020-02-19 Envelope 19 Urban Upgrading Improvement ion AL-ADF-15536-CW-RFB / Component 1: Urban Urban Regeneration of the Single Stage - One 5,016,039.7 2020-03- IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - International Signed 2019-05-28 2019-05-27 2019-06-02 2019-05-28 2019-07-14 2019-07-10 2019-08-13 2019-07-10 2019-09-17 2019-09-16 Existing Promenade "Naim Envelope 6 15 Improvement Frasheri" in Saranda Page 1 AL-ADF-203245-CW-RFB / Integrated upgrading of Component 2: Touristic Sites Single Stage - One 2021-10- IBRD / 86560 Post Request for Bids Open - National 0.00 Canceled 2020-12-23 2020-11-09 2020-12-28 2021-01-08 2021-02-08 2020-12-10 2021-03-10 2020-12-31 2021-04-14 Zvenec – Narta & Benja Upgrading Envelope 11 thermal waters AL-ADF-213482-CW-RFB / Integrated upgrading of Component 2: Touristic Sites Single Stage - One 2021-11- IBRD / 86560 Post Request for Bids Open - National 0.00 Canceled 2021-01-20 2021-01-21 2021-01-25 2021-01-21 2021-03-08 2021-02-22 2021-04-07 2021-03-30 2021-05-12 Zvenec – Narta & Benja Upgrading Envelope 08 thermal waters AL-ADF-221470-CW-RFB / Component 1: Urban Single Stage - One 4,035,771.3 2021-12- Berat town of integrated IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National Signed 2021-03-02 2021-02-25 2021-03-07 2021-04-18 2021-03-31 2021-05-18 2021-04-13 2021-06-22 2021-05-19 Envelope 1 19 urban upgrading/Package 1 – Improvement Gorica AL-ADF-15538-CW-RFB / Prioritized measures to Component 1: Urban Under address urgent safety Single Stage - One 2018-11- IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National 0.00 Implementat 2018-01-07 2021-04-16 2018-01-12 2018-02-23 2021-05-17 2018-03-25 2021-06-04 2018-04-29 concerns and prevent loss of Envelope 29 Improvement ion heritage structures in the Castle of Gjirokastra AL-ADF-240553-CW-RFB / Integrated urban upgrading of Berat/package no. 2 – Urban rehabilitation of Iliaz Vrioni Request for square; Visual improvement Component 1: Urban Bids - Small Pending Single Stage - One 2022-04- of the urban silhouette along IBRD / 86560 Upgrading and Infrastructure Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-06-28 2021-07-03 2021-08-14 2021-09-13 2021-10-18 Envelope 16 Antipatrea street in the city Improvement envelope ion center; Tourist signage and process) information board;/Management plans, interpretation GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AL-ADF-15581-GO-RFB / Component 3:Tourism Single Stage - One Solid waste equipment for IBRD / 86560 Market and Product Prior Request for Bids Open - National 0.00 Canceled 2017-05-30 2017-06-04 2017-07-16 2018-01-31 2017-08-15 2017-09-19 2018-01-19 Envelope Himara transfer station Development AL-ADF-15589-GO-RFQ / Component 4: Request for Single Stage - One IBRD / 86560 Post Open - National 131,517.71 Signed 2017-07-05 2017-08-30 2017-11-20 2017-11-30 Vehicles Implementation Support Quotations Envelope AL-ADF-44382-GO-RFQ / Pending Purchase of additional Component 4: Request for Single Stage - One IBRD / 86560 Post Open - National 0.00 Implementati 2018-01-24 2018-03-21 2018-09-17 accessories for smart board of Implementation Support Quotations Envelope on ADF's meeting room AL-ADF-54729-GO-RFB / Component 3:Tourism Single Stage - One Solid waste equipment for IBRD / 86560 Market and Product Post Request for Bids Open - National 434,959.17 Signed 2018-04-10 2018-06-25 2018-04-15 2018-03-28 2018-05-27 2018-05-14 2018-06-26 2018-05-25 2018-07-31 2018-07-13 2019-01-27 Envelope Himara transfer station Development AL-ADF-15582-GO-RFB / Component 3:Tourism Pending Solid W collection Single Stage - One IBRD / 86560 Market and Product Post Request for Bids Open - National 0.00 Implementati 2020-02-10 2020-02-15 2020-03-28 2020-04-27 2020-06-01 2020-10-30 equipment(Gjirokastra/other Envelope Development on as needed) AL-ADF-15586-GO-RFB / Component 3:Tourism Pending Equipment for tourism Single Stage - One IBRD / 86560 Market and Product Post Request for Bids Open - National 0.00 Implementati 2019-11-18 2019-11-23 2020-01-04 2020-02-03 2020-03-09 2020-07-10 information management and Envelope Development on statistic improvement AL-ADF-15588-GO-RFQ / Component 4: Request for Single Stage - One Office equipment and licenses IBRD / 86560 Post Open - National 33,806.30 Signed 2018-03-25 2018-05-20 2018-08-30 2018-08-20 Implementation Support Quotations Envelope for project implementation AL-ADF-15584-GO-RFB / Component 3:Tourism Pending Single Stage - One GIS equipment and licenses IBRD / 86560 Market and Product Post Request for Bids Open - National 0.00 Implementati 2020-02-17 2020-02-22 2020-04-04 2020-05-04 2020-06-08 2020-12-06 Envelope for 4 municipalities Development on AL-ADF-15583-GO-RFB / Component 3:Tourism Pending Financial Management Single Stage - One IBRD / 86560 Market and Product Post Request for Bids Open - National 0.00 Implementati 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 2020-11-22 Equipment for 4 Envelope Development on municipalities AL-ADF-15609-GO-RFB / Component 3:Tourism Pending Single Stage - One Asset Management Equipment IBRD / 86560 Market and Product Post Request for Bids Open - National 0.00 Implementati 2020-02-06 2020-02-11 2020-03-24 2020-04-23 2020-05-28 2020-12-26 Envelope for 4 municipalities Development on AL-ADF-111910-GO-RFQ / Component 3:Tourism Pending Equipment for local Request for Single Stage - One IBRD / 86560 Market and Product Post Open - National 0.00 Implementati 2019-10-19 2019-12-14 2020-03-13 destination management Quotations Envelope Development on entities NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AL-ADF-15552-CS-QCBS / Component 1: Urban Concept, Design and Quality And Cost- IBRD / 86560 Upgrading and Infrastructure Prior Open - International 0.00 Canceled 2017-05-30 2017-06-20 2017-08-03 2017-08-31 2017-09-30 2017-11-04 2017-12-09 2020-07-09 Supervision of Saranda Urban Based Selection Improvement Upgrading (line 3) Page 2 AL-ADF-15557-CS-CQS / Design of Urban Regeneration Component 1: Urban Consultant of the Existing Promenade IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - National 211,251.73 Signed 2017-07-11 2017-05-25 2017-08-01 2017-09-14 2017-06-28 2017-10-14 2017-06-28 2017-11-18 2017-09-10 2018-05-20 "Naim Frasheri" in Saranda. Improvement Selection (line 2) AL-ADF-15562-CS-CQS / Detailed design and Consultant Component 2: Touristic Sites construction supervision for IBRD / 86560 Post Qualification Open - International 103,802.40 Signed 2017-05-29 2017-09-28 2017-06-19 2017-09-28 2017-08-02 2018-03-26 2017-09-01 2018-03-19 2017-10-06 2018-03-30 2019-05-06 Upgrading Infrastructure for Viewpoints Selection along the touristic circuit AL-ADF-15567-CS-QCBS / Market Research & Component 3:Tourism Quality And Cost- Development Strategy for the IBRD / 86560 Market and Product Post Open - International 306,336.24 Signed 2017-05-26 2017-06-16 2017-06-15 2017-07-30 2017-10-17 2017-08-27 2017-11-17 2017-09-26 2018-01-15 2017-10-31 2018-02-08 2017-12-05 2018-04-04 2018-07-05 Based Selection South of Albania & four Development municipalities Consultant AL-ADF-15580-CS-INDV / Component 4: IBRD / 86560 Post Qualification Open - National 0.00 Canceled 2019-03-12 2019-03-26 2019-05-21 2019-06-25 2022-06-25 Results Assessment (M&E) Implementation Support Selection AL-ADF-15561-CS-CQS / Component 1: Urban Consultant Supervision of fast truck IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - International 0.00 Canceled 2017-05-31 2017-06-21 2017-08-04 2017-09-03 2017-10-08 2019-02-08 subproject ( line Improvement Selection 1,2,4,5,6,9,10,13) AL-ADF-15555-CS-QCBS / Concept, Design and Component 1: Urban Quality And Cost- Supervision of the Berat and IBRD / 86560 Upgrading and Infrastructure Prior Open - International 0.00 Canceled 2017-05-31 2017-09-26 2017-06-21 2017-08-04 2017-09-01 2017-10-01 2017-11-05 2017-12-10 2020-06-09 Based Selection Permet Integrated Urban Improvement Upgrading ( line 12 and14) AL-ADF-31055-CS-QCBS / Concept, Detail Designs and Component 1: Urban supervision for Integrated Quality And Cost- IBRD / 86560 Upgrading and Infrastructure Post Open - International 1,119,945.08 Signed 2017-10-04 2017-10-25 2017-10-04 2017-12-08 2018-01-30 2018-01-05 2018-03-01 2018-02-04 2018-03-11 2018-04-15 2018-05-31 2019-04-15 Urban Upgrading Based Selection Improvement Municipalities of Berati and Përmeti AL-ADF-21339-CS-QBS / Component 1: Urban Supervision of fast truck sub- Quality Based IBRD / 86560 Upgrading and Infrastructure Post Open - National 0.00 Canceled 2017-07-20 2017-08-10 2017-09-23 2017-10-21 2017-11-20 2017-12-20 2018-01-24 2019-01-24 project (Saranda and Selection Improvement Gjirokastra) AL-ADF-37532-CS-CQS / Component 1: Urban Consultant Supervision of fast truck Pending IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - National 0.00 2017-11-20 2017-12-11 2018-01-24 2018-02-23 2018-03-30 2018-09-26 subproject (Saranda and Implementation Improvement Selection Gjirokastra) AL-ADF-21342-CS-QBS / Component 1: Urban Quality Based Supervision of fast truck sub- IBRD / 86560 Upgrading and Infrastructure Post Open - National 0.00 Canceled 2017-07-21 2017-08-11 2017-09-24 2017-10-22 2017-11-21 2017-12-21 2018-01-25 2019-01-25 Selection project (Berat and Permet) Improvement AL-ADF-37871-CS-CQS / Supervision services for fast- Component 1: Urban Consultant truck sub-project in urban Pending IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - National 0.00 2017-11-22 2017-12-13 2018-01-26 2018-02-25 2018-04-01 2018-09-28 upgrading and infrastructure Implementation Improvement Selection improvement (Berat and Permet) AL-ADF-15553-CS-QCBS / Component 1: Urban Concept, Design and Quality And Cost- IBRD / 86560 Upgrading and Infrastructure Prior Open - International 0.00 Canceled 2017-06-30 2017-07-21 2017-09-03 2017-10-01 2017-10-31 2017-12-05 2018-01-09 2020-07-09 Supervision Urban Upgrading Based Selection Improvement Gjirokastra (line 7) AL-ADF-44317-CS-QCBS / Municipality of Saranda - Detailed Designs and Component 2: Touristic Sites Quality And Cost- Under IBRD / 86560 Post Open - International 785,770.71 2018-01-17 2018-01-17 2018-02-07 2018-03-23 2018-04-10 2018-04-20 2018-05-17 2018-05-20 2018-07-17 2018-06-24 2018-07-29 2019-07-29 Construction Supervision for Upgrading Based Selection Implementation Saranda Tourism Gateway Integrated Urban Upgrading AL-ADF-39736-CS-QCBS / Component 1: Urban Concept, Design and Quality And Cost- IBRD / 86560 Upgrading and Infrastructure Post Open - International 458,168.07 Signed 2017-12-07 2017-12-07 2017-12-28 2018-02-28 2018-03-13 2018-03-28 2018-04-17 2018-04-27 2018-06-14 2018-06-01 2018-07-06 2018-09-20 2019-07-06 Supervision Urban Upgrading Based Selection Improvement Gjirokastra (line 7) AL-ADF-15556-CS-CQS / Component 1: Urban Consultant Design and Supervision IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - National 242,675.38 Signed 2018-03-15 2018-04-05 2018-05-19 2018-10-29 2018-06-18 2018-12-21 2018-07-23 2018-12-24 2020-08-21 Gjirokastra system of Improvement Selection museums (line 8) AL-ADF-62578-CS-CQS / Primary Data Collection, Development of Mid-Term Consultant Component 4: and End Follow up Surveys, IBRD / 86560 Post Qualification Open - National 94,515.12 Signed 2018-05-14 2018-05-30 2018-05-16 2018-06-29 2018-06-14 2018-07-29 2018-07-13 2018-09-02 2018-07-23 2019-03-01 Implementation Support Assessment of PDO findings Selection achievement in the framework of PIUTD AL-ADF-15563-CS-QCBS / Site Management, Detailed Component 2: Touristic Sites Quality And Cost- Under design and construction IBRD / 86560 Post Open - International 0.00 2018-03-30 2020-11-02 2018-04-20 2018-06-03 2018-07-01 2018-07-31 2018-09-04 2018-10-09 2020-06-07 Upgrading Based Selection Implementation supervision for Infrastructure of IUTS AL-ADF-67670-CS-CQS / Site management, interpretive Consultant Component 2: Touristic Sites and visitor experience plans IBRD / 86560 Post Qualification Open - International 105,612.88 Signed 2018-09-10 2018-06-27 2018-10-01 2018-11-14 2018-08-20 2018-12-14 2018-09-26 2019-01-18 2018-10-24 2019-07-17 Upgrading for Zvernec - Narta & Benja Selection thermal waters touristic sites AL-ADF-15565-CS-CQS / Asset Management system - Component 3:Tourism Consultant Pending assessment and technical IBRD / 86560 Market and Product Post Qualification Open - National 0.00 2019-10-15 2019-11-05 2019-12-19 2020-01-18 2020-02-22 2020-09-21 Implementation specification for goods (line Development Selection 43) Page 3 AL-ADF-15566-CS-CQS / Geographic Information Component 3:Tourism Consultant Pending Systems - assessment and IBRD / 86560 Market and Product Post Qualification Open - National 0.00 2019-10-30 2019-11-20 2020-01-03 2020-02-02 2020-03-08 2020-09-07 Implementation technical specification for Development Selection goods (line 44) AL-ADF-15568-CS-QCBS / Market Development for the Component 3:Tourism Quality And Cost- South of Albania (Tourism IBRD / 86560 Market and Product Post Open - International 782,186.61 Signed 2019-05-16 2020-01-22 2019-06-06 2020-01-22 2019-07-20 2020-03-10 2019-08-17 2020-05-04 2019-09-16 2020-05-08 2019-10-21 2020-05-29 2019-11-25 2020-08-14 2022-09-24 Based Selection products promotion, line 16 Development and component 2 works) AL-ADF-15573-CS-QCBS / Component 3:Tourism Quality And Cost- Pending Guesthouse branding and IBRD / 86560 Market and Product Post Open - International 0.00 2019-10-31 2019-11-21 2020-01-04 2020-02-01 2020-03-02 2020-04-06 2020-05-11 2023-07-12 Based Selection Implementation market delivery Development AL-ADF-15574-CS-CQS / Tourism Information Management system and Component 3:Tourism Consultant Under Statistics Improvement - IBRD / 86560 Market and Product Post Qualification Open - National 0.00 2019-04-30 2021-05-07 2019-05-21 2021-05-25 2019-07-04 2019-08-03 2019-09-07 2020-04-08 Implementation assessment and technical Development Selection specification of goods (line 46) AL-ADF-15570-CS-QCBS / Component 3:Tourism Tourism Product and value Quality And Cost- Under IBRD / 86560 Market and Product Prior Open - International 0.00 2019-12-02 2020-11-03 2019-12-23 2020-11-09 2020-02-05 2021-04-12 2020-03-04 2021-04-16 2020-04-03 2020-05-08 2020-06-12 2023-07-13 chain development in selected Based Selection Implementation Development municipalities (line 16) AL-ADF-123249-CS-CQS / “Identification, Design of prioritized measures to Component 1: Urban Consultant address urgent safety IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - International 599,204.68 Signed 2019-07-28 2019-07-23 2019-08-18 2019-10-01 2019-09-20 2019-10-31 2019-09-26 2019-12-05 2019-12-27 2020-06-02 concerns and prevent loss of Improvement Selection heritage structures in the castle of Gjirokastra AL-ADF-189626-CS-CQS / Detailed Designs and Consultant Construction Supervision for Component 2: Touristic Sites IBRD / 86560 Post Qualification Open - International 115,922.92 Signed 2020-08-26 2020-08-26 2020-09-16 2021-02-02 2020-10-30 2021-01-25 2020-11-29 2021-03-01 2021-01-03 2021-03-31 2021-07-02 Infrastructure for Viewpoints Upgrading Selection along the touristic circuit in Southern Albania AL-ADF-194223-CS-CQS / Mobility Plan and Detailed Component 1: Urban Consultant Design of project investments IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - International 350,002.97 Signed 2020-09-18 2020-10-02 2020-10-09 2021-01-27 2020-11-22 2020-12-24 2020-12-22 2021-03-29 2021-01-26 2021-04-06 2021-07-25 for Integrated Urban Improvement Selection Upgrading of Gjirokastra AL-ADF-217475-CS-CQS / Component 1: Urban Consultant Supervision of work contract IBRD / 86560 Upgrading and Infrastructure Post Qualification Limited 0.00 Canceled 2021-02-08 2021-02-04 2021-02-22 2021-03-24 2021-04-28 2021-10-25 for Permet urban upgrading Improvement Selection AL-ADF-219890-CS-CQS / Supervision services for the Component 1: Urban Consultant works contract – “Permet IBRD / 86560 Upgrading and Infrastructure Post Qualification Limited 128,121.29 Signed 2021-02-19 2021-02-25 2021-03-05 2021-03-02 2021-04-04 2021-03-05 2021-05-09 2021-03-12 2021-11-05 urban upgrading” and Improvement Selection “Gjirokstra system of museums” AL-ADF-220974-CS-CQS / Consultant Gjirokastra Castle Sustainable Component 2: Touristic Sites Under IBRD / 86560 Post Qualification Open - International 0.00 2021-02-26 2021-03-04 2021-03-19 2021-05-02 2021-06-01 2021-07-06 2022-01-02 Management and Tourism Upgrading Implementation Selection Valorization Masterplan AL-ADF-222324-CS-CQS / Component 1: Urban Consultant Supervision for integrated IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - International 279,052.02 Signed 2021-03-05 2021-03-03 2021-03-26 2021-03-05 2021-05-09 2021-04-20 2021-06-08 2021-05-17 2021-07-13 2021-05-20 2022-01-09 urban upgrading works - Improvement Selection Municipality of Berat AL-ADF-222330-CS-CQS / Consultant Gjirokastra Castle Sustainable Component 2: Touristic Sites Under IBRD / 86560 Post Qualification Open - International 0.00 2021-03-05 2021-03-03 2021-03-26 2021-03-05 2021-05-09 2021-04-16 2021-06-08 2021-07-13 2022-01-09 Management and Tourism Upgrading Implementation Selection Valorization Masterplan AL-ADF-231637-CS-CQS / Supervision services for Component 1: Urban Consultant Under Integrated Urban Upgrading IBRD / 86560 Upgrading and Infrastructure Post Qualification Open - International 0.00 2021-04-30 2021-05-04 2021-05-21 2021-05-13 2021-07-04 2021-08-03 2021-09-07 2022-03-06 Implementation works - Municipality of Improvement Selection Gjirokastra AL-ADF-235051-CS-QCBS / Component 3:Tourism Product Development – Quality And Cost- Under IBRD / 86560 Market and Product Post Open - International 0.00 2021-05-21 2021-06-07 2021-06-11 2021-06-23 2021-07-25 2021-08-22 2021-09-21 2021-10-26 2021-11-30 2022-11-30 package 2 (outdoor & Based Selection Implementation Development museums) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AL-ADF-15172-CS-INDV / Individual Component 4: Under Project Coordinator - Urban IBRD / 86560 Post Consultant Open 0.00 2017-05-13 2017-05-25 2017-07-01 2017-04-03 2017-07-22 2017-08-26 2022-09-26 Implementation Support Implementation Specialist PCU Selection Individual AL-ADF-15576-CS-INDV / Component 4: Under IBRD / 86560 Post Consultant Open 0.00 2017-05-18 2017-05-25 2017-07-06 2017-04-03 2017-07-27 2017-08-31 2022-10-01 Tourism Specialist - PCU Implementation Support Implementation Selection Individual AL-ADF-15577-CS-INDV / Component 4: Under IBRD / 86560 Post Consultant Open 0.00 2017-05-18 2017-05-25 2017-07-06 2017-03-31 2017-07-27 2017-05-05 2017-08-31 2022-10-01 Architect - PCU Implementation Support Implementation Selection AL-ADF-15559-CS-INDV / International expert on Component 1: Urban Individual conservation and structural IBRD / 86560 Upgrading and Infrastructure Post Consultant Open 25,348.68 Signed 2017-05-29 2017-11-01 2017-07-17 2017-12-01 2017-08-07 2018-03-05 2018-03-07 2018-03-07 2018-04-06 restoration of monuments and Improvement Selection historic buildings. (line 4) Page 4 AL-ADF-67092-CS-INDV / Individual Consultant for Preparation of a Property Evaluation Report of Project Individual Component 4: Affected Persons due to the IBRD / 86560 Post Consultant Open 5,358.00 Signed 2018-06-29 2018-06-19 2018-08-17 2018-06-22 2018-09-07 2018-06-26 2018-10-12 2018-06-29 2019-04-10 Implementation Support planned implementation of Selection subproject "Upgrading of the vehicle road segment Muzak Topia to Berat Castle" AL-ADF-95814-CS-INDV / Assessment of social impact Individual at proposed Blue Eye touristic Component 4: IBRD / 86560 Post Consultant Limited 3,971.16 Signed 2019-01-22 2019-01-27 2019-01-29 2019-02-17 2019-01-27 2019-03-24 2019-01-29 2019-04-13 site Implementation Support Selection Project for Integrated Tourism Development AL-ADF-15564-CS-INDV / Financial Management Component 3:Tourism Individual Pending Systems - assessment and IBRD / 86560 Market and Product Post Consultant Open 0.00 2019-09-18 2019-11-06 2019-11-27 2020-01-01 2020-05-31 Implementation technical specifications for Development Selection goods. (line 42) Individual AL-ADF-15578-CS-INDV / Component 4: IBRD / 86560 Post Consultant Open 51,395.04 Signed 2019-09-10 2020-07-15 2019-10-29 2020-09-08 2019-11-19 2020-09-08 2019-12-24 2020-09-29 2024-11-23 Cultural Heritage Consultant Implementation Support Selection Individual AL-ADF-15579-CS-INDV / Component 4: Pending IBRD / 86560 Post Consultant Open 0.00 2019-12-16 2020-02-03 2020-02-24 2020-03-30 2025-02-28 Site Management Consultant Implementation Support Implementation Selection Individual AL-ADF-217478-CS-INDV / Component 4: IBRD / 86560 Post Consultant Limited 35,975.63 Signed 2021-02-08 2021-02-05 2021-02-13 2021-02-08 2021-03-06 2021-05-06 2021-04-10 2021-05-11 2021-10-07 Project coordinator Implementation Support Selection Individual AL-ADF-234570-CS-INDV / Component 4: Under IBRD / 86560 Post Consultant Limited 0.00 2021-05-18 2021-05-19 2021-05-23 2021-05-20 2021-06-13 2021-07-18 2022-01-14 Senior Architect Exxpert Implementation Support Implementation Selection Page 5 Procurement Plan (Textual Part) I. General 1. Project Information Country: Zambia Project Name: Zambia Education Enhancement Project Project Id: P158570 2. Project Implementation Agency: Ministry of General Education 3. Date of the Procurement Plan: 4. Period Covered by this procurement plan: June 01, 2018 to Nov 30, 2019 II. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. III. Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. IV. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Zambia - Public Procurement Act, 2008, Amendment Act of 2013 and the Public procurement Regulations, of 2013, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: (the “Procurement Guidelines”), and the additional provisions in the following paragraphs: 1 (a) Eligibility: Eligibility to participate in a procurement process and to be awarded an Association-financed contract shall be as defined under Section I of the Procurement Guidelines; accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Association for reasons other than those provided in Section I of the Procurement Guidelines. No restriction based on nationality of bidders and/or origin of goods shall apply, and foreign bidders shall be allowed to participate in NCB without application of restrictive conditions, such as, but not limited to, mandatory partnering or subcontracting with national entities. (b) Domestic Preference: No margins of preference of any sort shall be applied in the bid evaluation. (c) Bidding Documents: Procuring entities shall use bidding documents acceptable to the Association. (d) Bid validity: An extension of bid validity, if justified by exceptional circumstances, may be requested in accordance with Appendix 1 of the Procurement Guidelines. A corresponding extension of any bid guarantee shall be required in all cases of extension of bid validity. A bidder may refuse a request for extension of bid validity without forfeiting its bid guarantee. (e) Qualification: Qualification criteria shall be clearly specified in the bidding documents. All criteria so specified, and only such specified criteria, shall be used to determine whether a bidder is qualified. Qualification shall be assessed on a “pass or fail” basis, and merit points shall not be used. Such assessment shall be based entirely upon the bidder’s or prospective bidder’s capability and resources to effectively perform the contract, taking into account objective and measurable factors, including: (i) relevant general and specific experience, and satisfactory past performance and successful completion of similar contracts over a given period; (ii) financial position; and where relevant (ii) capability of construction and/or manufacturing facilities (f) Prequalification procedures and documents acceptable to the Association shall be used for large, complex and/or specialized works. Verification of the information upon which a bidder was prequalified, including current commitments, shall be carried out at the time of contract award, along with the bidder’s capability with respect to personnel and equipment. Where pre-qualification is not used, the qualification of the bidder who is recommended for award of contract shall be assessed by post-qualification, applying the qualification criteria stated in the bidding documents. (g) Bid Evaluation: All bid evaluation criteria other than price shall be quantifiable in monetary terms. Merit points shall not be used, and no minimum point or percentage value shall be assigned to the evaluation criteria or significance of price in bid evaluation. No negotiations shall be permitted. (h) Guarantees: Guarantees shall be in the format, shall have the period of validity and shall be submitted when and as specified in the bidding documents. (i) Cost Estimates: Detailed cost estimates shall be confidential and shall not be disclosed to prospective bidders. No bids shall be rejected on the basis of 2 comparison with the cost estimates without the Association’s prior written concurrence. (j) Rejection of bids and re-bidding: No bid shall be rejected solely because it falls outside of a predetermined price range or exceeds the estimated cost. All bids (or the sole bid if only one bid is received) shall not be rejected, the procurement process shall not be cancelled, and new bids shall not be solicited without the Association’s prior written concurrence. (k) Fraud and corruption: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the Association’s policy to sanction firms or individuals found to have engaged in fraud and corruption as set forth in the Procurement Guidelines. (l) Inspection and audit rights: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the Bank’s policy with respect to inspection and audit of accounts, records and other documents relating to the submission of bids and contract performance. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.4(c) and 5.5 of the Procurement Regulations, the request for bids/request for proposals/request for quotations document shall require that Bidders/Proposers submitting Bids/Proposals/quotations present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. V. Prequalification: Not applicable VI. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable VII. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable VIII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each. (a) Goods: Not applicable 3 (b) Works: Not applicable Domestic preference is not applicable for National Open Competitive Procurement IX. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable: Not applicable X. Other Relevant Procurement Information Not applicable XI. Procurement Prior Review Thresholds (US$ millions) Type of Procurement High Substantial Moderate Low Risk Risk Risk Risk Works (including turnkey, supply 15 & installation of plant and equipment, and PPP) Goods, information technology 2 and non-consulting services Consultants: firms 0.3 Consultants: Individuals 0.1 Post Review: All contacts not subject to prior review shall be subject to post review. XII. Thresholds for Procurement Approaches and Method (US$ millions) Works Goods, IT and Non-consulting Shortlist of National Services Consultants Open Open Request Open Open Request Consulti Engineeri Internatio Nationa for Internatio Nation for ng ng & nal l Quotati nal al Quotati Services Construct on on ion ≥ < ≥ < Supervisi ≤ ≤ on 15 15 0.2 2 2 0.1 0.3 0.3 4 XIII. Summary of the procurement packages: (Planned for the first 18 months after project effectiveness): Category: Sr. Contract Description Estimat Rev Market Selectio Evalua Procure- Prequa Domesti Expect Expecte No ed Cost iew Approa n -tion ment li- c ed d date (US$) by ch Method Option Process fication Preferen date of of Ban (Open- (RFP, s (Single (Yes/ ce bid/ Contrac k Nation RFB, (BAFO, stage- No) (Yes/No) propos t (Pri al/ QCBS Rated single al Signatur or/ Limite etc.) Criteria envelope openin e Post d etc.) etc.) etc.) g ) 1 Procure materials for 19,557. Post Limite RFQ BAFO Single NO NO 16/07/ 3/08/20 ZEEP Launch 28 d 2018 18 2 Procure Consultancy 16,176. Post Open DS BAFO Single NO NO 8/10/2 26/10/2 services for 47 018 018 development of Project Implementation Unit Training Needs Assessment 3 Procure Consultancy 25,171. Prio Open DS BAFO Single NO NO 26/03/ 15/05/2 services for Year 0 57 r 2018 018 Independent Verification Audit by Auditor General 4 Procure Consultancy 14,705. Post Open CQS BAFO Single NO NO 12/07/ 03/08/2 services for 88 2018 018 development of Communication Strategy 5 Procure furniture for 13,284. Post Limite RFQ BAFO Single NO NO 06/07/ 20/07/2 PIU Office 31 d 2018 018 6 Procure Office 29,277. Post Limite RFQ BAFO Single NO NO 29/06/ 13/07/2 equipment for PIU 47 d 209 018 Office 7 Procure Consultancy 31,552. Post Open CQS BAFO Two Yes NO 9/07/2 7/09/20 services for the 94 Stage 018 18 development of the Monitoring & Evaluation Project Sub System 8 127,60 Post Open CQS BAFO Two Yes NO 23/07/ 21/09/2 Procure Consultancy 0 Stage 2018 08 services to develop a school mapping framework 9 598,00 Prio Open QCBS BAFO Two Yes NO 23/07/ 12/10/2 Procure consultancy 0 r Stage 2018 08 services for development of the EEMIS Software 10 Procure Consultancy to 230,00 Post Open CQS BAFO Two Yes NO 23/07/ 21/09/2 migrate the Legacy 0 Stage 2018 08 Access Based EMIS into the desired on new requirements from the Business Process 11 Procure Consultancy 175,00 Post Open CQS BAFO Two Yes NO 23/07/ 21/09/2 services to develop 0 Stage 2018 08 tools and standards for school records management systems 12 Procure Consultancy 168,90 Post Open CQS BAFO Two Yes NO 23/07/ 21/09/2 services to develop 0 Stage 2018 08 Specific EMIS Modules 5 13 Procurement 50,000 Prio Open DS Single NO NO 16/07/ 31/07/2 Consultant services for r 2018 018 Component 3 Coordinator 14 Procurement 50,000 Prio Open DS Single NO NO 16/07/ 31/07/2 Consultant services for r 2018 018 Communication Officer 15 Procure services for PIU 15,900 Post Limite RFQ BAFO Single NO NO 6/07/2 13/07/2 Office Partitioning d 018 018 16 Procurement of project 3,190,0 Prio Direct UNOPS BAFO Single NO NO 20/07/ 24/08/2 motor vehicles 00 r 2018 018 17 Procurement of project 301,00 Prio Direct UNOPS BAFO Single NO NO 20/07/ 24/08/2 motor cycles 0 r 2018 018 6 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 7 contract, financially or in any other manner;2 (ii) to be a nominated3 sub- contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 8 the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 9 PROCUREMENT Zambia : Zambia Education Enhancement Project PLAN General Information Country: Zambia Bank’s Approval Date of the Original Procurement Plan: 2018-06-28 2021-05-15 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158570 GPN Date: Project Name: Zambia Education Enhancement Project Loan / Credit No: IDA / 61360 Ministry of General Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Enhancing Planning, ZM-MOGE-18 / Procure Management and Monitoring Request for Single Stage - One 2019-01- services for PIU Office IDA / 61360 Post Limited 15,900.00 39,895.75 Signed 2018-06-06 2018-07-05 2018-08-01 2018-09-10 and Evaluation Capacity, and Quotations Envelope 28 partitioning Project Coordination ZM-MOGE-170335-CW-RFB / Supply and installation of Increasing Equitable Access Single Stage - One 2021-02- IDA / 61360 Prior Request for Bids National 8,000,000.00 0.00 Canceled 2020-05-04 2020-05-09 2020-06-20 2020-07-20 2020-08-24 solar water pumps to ZEEP to Secondary Education Envelope 20 schools GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOGE-64790-GO-UN / Improving the Quality of UN Agencies procurement of project motor IDA / 61360 Post Direct 3,190,000.00 467,135.40 Signed 2018-07-18 2018-07-23 2018-07-25 2018-08-27 2018-09-21 2019-02-23 Teaching and Learning (Direct) vehicles ZM-MOGE-64800-GO-UN / Increasing Equitable Access UN Agencies procurement of project motor IDA / 61360 Post Direct 301,000.00 0.00 Canceled 2018-07-18 2018-07-23 2018-08-27 2019-02-23 to Secondary Education (Direct) bikes Enhancing Planning, ZM-MOGE-01 / Procure Management and Monitoring Request for Single Stage - One IDA / 61360 Post Limited 19,557.28 0.00 Canceled 2018-06-08 2018-08-03 2019-01-30 materials for ZEEP launch and Evaluation Capacity, and Quotations Envelope Project Coordination ZM-MOGE-05 / Procure Enhancing Planning, Under office for furniture Project Management and Monitoring Request for Single Stage - One IDA / 61360 Post Limited 13,284.31 0.00 Implementati 2018-06-20 2018-08-21 2018-08-15 2019-02-11 Implementation Unit (PIU) and Evaluation Capacity, and Quotations Envelope on office Project Coordination Enhancing Planning, ZM-MOGE-06 / Procure Under Management and Monitoring Request for Single Stage - One Office equipment for the PIU IDA / 61360 Post Limited 29,277.47 0.00 Implementati 2018-06-20 2018-08-21 2018-08-15 2019-02-11 and Evaluation Capacity, and Quotations Envelope office on Project Coordination ZM-MOGE-118828-GO-RFB / Supply and Delivery of Grades 5 and 8 Textbooks Improving the Quality of Single Stage - Two (Revised Curriculum) to IDA / 61360 Prior Request for Bids Open - International 2,300,000.00 0.00 Canceled 2019-06-19 2019-06-18 2019-06-24 2019-08-30 2019-08-05 2019-10-16 2019-11-22 2020-05-20 Teaching and Learning Envelope selected Districts in Zambia on the basis of a 3 years framework agreement ZM-MOGE-169658-GO-RFB / Supply and Delivery of Grades 5 and 8 Textbooks Improving the Quality of Single Stage - Two (Revised Curriculum) to IDA / 61360 Prior Request for Bids International 2,300,000.00 193,256.30 Signed 2020-04-21 2020-04-21 2020-04-26 2020-06-07 2019-10-11 2020-08-20 2020-04-27 2020-09-24 2020-07-24 2021-03-23 Teaching and Learning Envelope selected Districts in Zambia on the basis of a 3 years framework agreement ZM-MOGE-186831-GO-RFQ / Procurement of 512 Increasing Equitable Access Request for Single Stage - One IDA / 61360 Post Limited 9,000.00 9,320.74 Signed 2020-08-05 2019-11-04 2020-09-30 2019-12-16 2021-03-29 Suggestion Boxes for the ZEEP to Secondary Education Quotations Envelope Schools ZM-MOGE-183335-GO-RFB / SUPPLY AND DELIVERY OF GRADES 1,2,4 6,9,10 AND 11 TEXTBOOKS AND TEACHERS Under GUIDES (REVISED Improving the Quality of Single Stage - Two IDA / 61360 Prior Request for Bids Open - International 2,137,115.68 0.00 Implementati 2020-07-13 2020-09-21 2020-07-18 2020-12-29 2020-08-29 2021-04-29 2020-11-11 2020-12-16 2021-06-14 CURRICULUM) TO SELECTED Teaching and Learning Envelope on DISTRICTS IN ZAMBIA ON BASIS OF A 3 YEARS FRAMEWORK AGREEMENT BASIS ON LOT BY LOT BASIS ZM-MOGE-183343-GO-RFB Under / SUPPLY AND DELIVERY OF Increasing Equitable Access Single Stage - One IDA / 61360 Post Request for Bids Open - International 1,411,764.70 0.00 Implementati 2020-07-31 2020-10-16 2020-08-05 2021-02-10 2020-09-16 2021-01-15 2020-10-16 2021-04-07 2020-11-20 2021-05-19 LABORATORY EQUIPMENT to Secondary Education Envelope on AND REAGENTS ZM-MOGE-193596-GO-RFB Under / Supply and Delivery of Home Improving the Quality of Single Stage - One IDA / 61360 Post Request for Bids Open - National 418,200.00 0.00 Implementati 2020-09-18 2020-10-16 2020-09-23 2020-11-04 2020-12-03 2020-12-04 2021-02-09 2021-01-08 2021-07-07 Economics Equipment for 82 Teaching and Learning Envelope on ZEEP Schools ZM-MOGE-172553-GO-RFB / Supply and Delivery of Grades 1,2 and 4 Textbooks Improving the Quality of IDA / 61360 Prior Request for Bids 6,000,000.00 0.00 Canceled 2020-05-11 2020-05-11 2020-05-11 2020-05-11 2020-05-11 2020-05-11 and Teacher's Guides to Teaching and Learning Selected Districts in Zambia on Basis of 3 years Framework Agreement ZM-MOGE-233912-GO-RFB Under / Supply and Installation of Increasing Equitable Access Single Stage - One IDA / 61360 Post Request for Bids Open - International 350,162.16 0.00 Implementati 2021-04-27 2021-06-01 2021-05-10 2021-06-11 2021-06-21 2021-07-21 2021-08-25 2022-02-21 Solar Water Pumps to 82 ZEEP to Secondary Education Envelope on Scools Page 1 ZM-MOGE-233911-GO-RFB Under / Supply and Installation of Increasing Equitable Access Single Stage - One IDA / 61360 Post Request for Bids Open - International 1,680,459.77 0.00 Implementati 2021-05-04 2021-06-01 2021-05-16 2021-06-11 2021-06-27 2021-07-27 2021-08-31 2022-02-27 Solar Panels to Selected ZEEP to Secondary Education Envelope on Schools NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Enhancing Planning, ZM-MOGE-204292-NC-RFP / Management and Monitoring Request for Single Stage - Two IDA / 61360 Post Open - National 60,000.00 0.00 Canceled 2020-11-11 2021-01-27 2021-01-27 2020-11-16 2021-04-07 2021-07-25 2023-01-16 Procurement of Office Space and Evaluation Capacity, and Proposals Envelope Project Coordination Enhancing institutional Under ZM-MOGE-232696-NC-RFQ Request for Single Stage - One IDA / 61360 capacity for implementation Post Open - National 35,714.29 0.00 Implementati 2021-05-17 2021-06-11 2021-07-12 2022-01-08 / Procurement of Office Space Quotations Envelope of safe school program on ZM-MOGE-234313-NC-RFQ Pending Increasing Equitable Access / Procurement of Helpline IDA / 61360 Post Direct Selection Direct 95,238.10 0.00 Implementati 2021-05-20 2021-05-25 2021-08-01 2022-01-28 to Secondary Education Phone Services on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOGE-74751-CS-CQS / Enhancing Planning, Procurement of Consultancy Management and Monitoring Least Cost IDA / 61360 Post Open - National 250,000.00 0.00 Canceled 2018-10-04 2018-10-25 2018-12-08 2019-01-05 2019-02-04 2019-03-11 2019-04-15 2019-10-12 Services for an Independent and Evaluation Capacity, and Selection Verification Agency. Project Coordination ZM-MOGE-08 / Procure Enhancing Planning, Consultancy services for the Consultant Management and Monitoring development of the IDA / 61360 Post Qualification Open - National 31,552.94 0.00 Canceled 2018-06-15 2018-07-06 2018-08-19 2018-09-18 2018-10-23 2019-04-21 and Evaluation Capacity, and Monitoring & Evaluation Selection Project Coordination Project Sub System. ZM-MOGE-81154-CS-CQS / Enhancing Planning, Consultant Consultancy Services for Management and Monitoring Under IDA / 61360 Post Qualification Limited 250,000.00 0.00 2018-10-10 2018-08-01 2018-10-24 2018-11-23 2018-11-23 2019-01-11 2018-12-28 2019-06-26 Independent Verification and Evaluation Capacity, and Implementation Selection Agent (IVA) Project Coordination ZM-MOGE-102110-CS-CQS / Enhancing Planning, Consultant Consultancy Services for the Management and Monitoring Under IDA / 61360 Post Qualification Open - National 50,000.00 0.00 2019-02-25 2019-04-10 2019-03-18 2019-08-26 2019-05-01 2019-08-26 2019-05-31 2019-11-08 2019-07-05 2020-01-01 Development of a and Evaluation Capacity, and Implementation Selection Communication Strategy Project Coordination ZM-MOGE-117563-CS-LCS / Consultancy Services for the Third-party Agency of Construction Quality Review. The consulting services ("the Increasing Equitable Access Least Cost Under Services") include the IDA / 61360 Post Open - National 175,000.00 0.00 2019-06-18 2019-06-18 2019-07-09 2019-10-11 2019-08-22 2019-10-11 2019-09-19 2019-09-09 2019-10-19 2019-09-09 2019-11-23 2019-10-11 2019-12-28 2020-06-25 to Secondary Education Selection Implementation reviewing of the quality of construction and its compliance with the drawings and Technical Specifications and ESMF ZM-MOGE-193584-CS-CQS / Consultancy to Develop a Project Implementation Consultant Improving the Quality of Manual (PIM) For the Zambia IDA / 61360 Post Qualification Limited 12,500.00 0.00 Canceled 2020-09-11 2020-11-20 2020-09-25 2020-10-25 2020-11-29 2021-05-28 Teaching and Learning Education Enhancement Selection Project Additional Financing (ZEEP-AF) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOGE-04 / Procure Enhancing Planning, Consultancy services for Management and Monitoring IDA / 61360 Post Direct Selection Direct 14,705.88 0.00 Canceled 2018-06-15 2018-08-31 2018-06-25 2018-08-29 2019-02-25 development of and Evaluation Capacity, and Communication Strategy Project Coordination Enhancing Planning, ZM-MOGE-15 / Procurement Management and Monitoring Consultant services for IDA / 61360 Prior Direct Selection Direct 50,000.00 0.00 Canceled 2018-06-02 2018-06-12 2018-08-16 2019-02-12 and Evaluation Capacity, and Component 3 Coordinator Project Coordination Enhancing Planning, ZM-MOGE-16 / Procurement Management and Monitoring Consultant services for IDA / 61360 Prior Direct Selection Direct 50,000.00 0.00 Canceled 2018-06-02 2018-06-12 2018-08-16 2019-02-12 and Evaluation Capacity, and Communication Officer Project Coordination ZM-MOGE-77552-CS-CDS / Consultancy for the Enhancing Planning, development of Monitoring & Management and Monitoring Under IDA / 61360 Post Direct Selection Direct 184,552.94 0.00 2018-10-03 2018-09-27 2018-10-13 2018-11-28 2018-12-17 2019-06-15 Evaluation Plan and Project and Evaluation Capacity, and Implementation Management Information Project Coordination System ZM-MOGE-81026-CS-CDS / Enhancing Planning, Consultancy Services for Management and Monitoring IDA / 61360 Post Direct Selection Direct 250,000.00 0.00 Canceled 2018-10-08 2018-10-18 2018-12-22 2019-06-20 Independent Verification and Evaluation Capacity, and Agent (IVA) Project Coordination Page 2 ZM-MOGE-130526-CS-INDV / CONSULTANCY SERVICES FOR THE DEVELOPMENT OF A PROJECT PROCUREMENT STRATEGY FOR DEVELOPMENT Enhancing Planning, Individual (PPSD), PROCUREMENT PLAN Management and Monitoring Under IDA / 61360 Post Consultant Limited 7,000.00 0.00 2019-09-04 2019-09-09 2019-09-09 2019-10-11 2019-09-30 2019-11-14 2019-11-04 2020-05-02 AND GENERAL PROCUREMENT and Evaluation Capacity, and Implementation Selection NOTICE FOR THE ADDITIONAL Project Coordination FINANCING FOR THE “ZAMBIA EDUCATION ENHANCEMENT PROJECT - P170513” ZM-MOGE-233753-CS-INDV / Consultancy Services to Develop a Project Individual Implementation Manual (PIM) Improving the Quality of IDA / 61360 Post Consultant Limited 12,500.00 0.00 Under Review 2021-05-12 2021-05-15 2021-05-17 2021-06-07 2021-07-12 2022-01-08 for the Zambia Education Teaching and Learning Selection Enhancement Project Additional Financing (ZEEP- AF) ZM-MOGE-183340-CS-CDS / Enhancing Planning, CONSULTANCY SERVICES FOR Management and Monitoring IDA / 61360 Prior Direct Selection Direct 96,000.00 0.00 Canceled 2020-07-13 2021-02-08 2020-07-23 2020-07-01 2020-09-26 2021-03-25 DEVELOPING A BOOK and Evaluation Capacity, and TRACKING SYSTEM Project Coordination ZM-MOGE-234061-CS-CDS / Enhancing Planning, Consultancy Services for the Management and Monitoring Under IDA / 61360 Post Direct Selection Direct 300,000.00 0.00 2020-07-13 2021-05-15 2020-07-23 2021-06-01 2020-09-26 2021-03-25 Development of a Book and Evaluation Capacity, and Implementation Tracking System Project Coordination Enhancing Planning, Individual IC 042021 / Hiring of Management and Monitoring IDA / 61360 Post Consultant Open 89,910.00 0.00 Under Review 2021-05-14 2021-05-21 2021-07-02 2021-07-23 2021-08-27 2022-02-23 Procurement Specialist and Evaluation Capacity, and Selection Project Coordination Page 3 Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: Original, December 2016; Revision 1 of Updated Procurement Plan, February 2017. 2. Date of General Procurement Notice: Not Applicable 3. Period covered by this procurement plan: From June 2017 to June 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. NCB (Works) From US$ 15 million All 2. NCB (Goods and Non- From US$ 4 million All Consulting Services) 3. Shopping (Works) None None 4. Shopping (Goods and Non- None None Consulting Services) 5. Direct Contracting (Works) From US$ 15 million All Direct Contracting (Goods From US$ 4 million All and Non-Consulting Services) 6. Community Participation None None 2. Prequalification. Bidders for Not applicable shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.19 of the Guidelines: The Operations Manual describes the methods and procedures applicable to the Community Participation under CDD Component and Subprojects. 4. Reference to (if any) Project Operational/Procurement Manual: The Operations Manual issued by the Alternative Agriculture Center of the North of Minas Gerais State (Project Implementation Unit) describes the methods and procedures applicable to all procurement of goods, July 9, 2010 works, non-consulting services and consulting services financed by the Grant Agreement # TF018765. 5. Any Other Special Procurement Arrangements: Not Applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior/Pos US$ rence t) million (yes/ no) 1 Summary 0.18 1 No Post of the NCBs (Non- Consulting Services) 2 Summary 0.05 10 No Post of the Shoppings (Goods) 3 Summary 0.24 20 No Post of the Shoppings (Non- Consulting Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) From US$ 2 million All 2. Single Source Selection (Firms) From US$ 2 million All 3. Individual Consultant From US$ 400,000 All 4 Single Source Selection From US$ 400,000 All (Individuals) 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 1,500,000 equivalent per contract, may comprise entirely of national consultants in July 9, 2010 accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million 1 Summary 0.01 3 Post IC of number of contracts that will be let under methods other than QCBS July 9, 2010 PROCUREMENT Brazil : BR DGM for Indigenous People and Traditional Communities PLAN General Information Country: Brazil Bank’s Approval Date of the Original Procurement Plan: 2016-12- 12 2021-05- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P143492 GPN Date: 25 2017-06- Project Name: BR DGM for Indigenous People and Traditional Communities 23 Loan / Credit No: TF / 18765 Alternative Agriculture Center of the North of Minas Gerais State Executing Agency(ies): WORKS Procure Bid Evaluation Activity Reference No. Actual Draft Pre- Draft Bidding Specific Proposal Loan / Credit Market Procurement Prequalificati High SEA/SH ment Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount qualification Document / Procurement Notice Submission / Signed Contract No. Approach Process on (Y/N) Risk Docume Status Evaluation Report as Issued Recommendation Completion (US$) Documents Justification / Invitation Opening / Minutes nt Type for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne Actu d al SUB 55-12 / CT55.12 Patio para a instalacao do conjunto modular com 70 metros quadrado em piso Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017- de concreto. Base estrutural TF / 18765 and Adaptive Community Post Limited 0.00 Implemen Quotations Envelope 27 25 10-23 com cobertura baneiro Initiatives tation vestuario em alvenaria instalacao de esgoto sanitario e cercamento do perimetro SUB 61-17 / CQ61.17 Contratação de serviços de Component 1: Sustainable 2019- Request for Single Stage - One Complete 2017-07- 2019-04- 2017-07- 2019-05- 2017- reforma do prédio onde sera TF / 18765 and Adaptive Community Post Limited 8,847.95 11- Quotations Envelope d 07 17 31 17 10-29 instalado a unidade de Initiatives 27 beneficiamento SUB 212-4 / Serviço de Component 1: Sustainable 2020- Obra civil de construção da Request for Single Stage - One 13,219.5 Complete 2019-11- 2019-11- 2019-12- 2020-01- 2020- TF / 18765 and Adaptive Community Post Limited 05- cozinha comunitária, Quotations Envelope 6 d 24 26 14 02 03-13 Initiatives 15 incluindo mão de obra e materiais SUB 166 SC 11/2019 / Serviço de obra civil de Component 1: Sustainable Under Request for Single Stage - One 22,457.9 2019-12- 2021-01- 2020-01- 2020- construção da Cozinha TF / 18765 and Adaptive Community Post Limited Implemen Quotations Envelope 2 14 21 03 04-02 Comunitária, incluindo mão Initiatives tation de obra e materiais GOODS Activity Reference No. Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual BR-CAA-3305-GO-RFQ / aquisicao de quarenta e um tablets para uso dos Component 1: Sustainable Pending Request for Single Stage - One 2016-12- 2017-01- 2017-03- subprojetos para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 21 13 14 acompanhamento e Initiatives ation monitoramento dos subprojetos BR-CAA-3264-GO-RFQ / aquisicao de televisor smart Component 3: Project Pending tv sessenta e cinco Request for Single Stage - One 2017-02- 2017-03- 2017-05- TF / 18765 Management, Monitoring Post Limited 0.00 Implement polegadas e curva para Quotations Envelope 13 06 05 and Evaluation ation transmissao audio visual para estruturacao da sala reunioes projeto BR-CAA-4664-GO-RFQ / aquisicao de material pedagogico tipo bloco e Component 3: Project Pending papel e caneta e papel sufite Request for Single Stage - One 2015-12- 2015-12- 2016-02- TF / 18765 Management, Monitoring Post Limited 0.00 Implement para impressao e pasta Quotations Envelope 01 23 21 and Evaluation ation papel para realizar uma reuniao anual e duas extraordinaria do comite gestor nacional BR-CAA-4669-GO-RFQ / aquisicao de material pedagogico tipo canetas e Component 1: Sustainable Pending Request for Single Stage - One 2016-01- 2016-02- 2016-04- papel para realizacao de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 11 03 03 tres oficinas de divulgacao e Initiatives ation duas de elaboracao e tres seminarios BR-CAA-4663-GO-RFQ / aquisicao de seis computadores para equipe chave e assessora do Component 3: Project projeto e uma impressora Request for Single Stage - One 2016-02- 2016-02- 2016-04- 2016-04- 2016-06- TF / 18765 Management, Monitoring Post Limited 5,396.72 Signed multifuncional para o Quotations Envelope 18 08 08 08 07 and Evaluation escritorio do projeto situado em brasilia para desenvolvimento das atividades BR-CAA-4666-GO-RFQ / aquisicao de vinte tablets para uso da equipe chave de Component 3: Project apoio e estagiarios durante Request for Single Stage - One 2016-06- 2016-06- 2016-06- 2016-06- 2016-08- 2016-08- TF / 18765 Management, Monitoring Post Limited 6,367.03 Completed monitoramento do projeto e Quotations Envelope 03 03 20 20 19 20 and Evaluation aquiscao de cabo para equipamentos audivisuais durante reunioes do projeto BR-CAA-5585-GO-RFQ / Aquisição de material pedagógico para duas oficinas de elaboração de Component 1: Sustainable projetos, tipo: pincel, Request for Single Stage - One 2017-01- 2017-01- 2017-01- 2017-01- 2017-01- 2017-01- TF / 18765 and Adaptive Community Post Limited 437.58 Completed hidrocor, canetas Quotations Envelope 13 17 17 18 22 20 Initiatives hidrográficas coloridas grossas, kits de tintas com pinceis, papel tipo oficio, rolo de papel kraft, rolo de fita adesiva, rolo de barbante, etc BR-CAA-3252-GO-RFQ / Aquisição de 24 poltronas com estrutura de assento e encosto em forma de Component 3: Project Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- concha inteiriça resistente a TF / 18765 Management, Monitoring Post Limited 0.00 Implement Quotations Envelope 27 16 14 120kg, sem braço, base em and Evaluation ation aço, revestimento de encosto e assento em couro sintético para sala reuniões DGM. BR-CAA-17780-GO-RFQ / Serviço de confecção de Mesa de reuniões em MDF medindo 2,75m x 1,40 com Component 3: Project Pending fiação embutida no centro Request for Single Stage - One 2017-06- 2017-07- 2017-09- TF / 18765 Management, Monitoring Post Limited 0.00 Implement para acesso de Quotations Envelope 28 24 22 and Evaluation ation computadores e eletrônicos E Aparador medindo 1,10 por 30cm de profundidade em MDF para a sala reuniões DGM. BR-CAA-3324-GO-RFQ / Aquisição de lousa de vidro jateado e medindo dois metros de comprimento por Component 3: Project Pending um e dez metros de largura Request for Single Stage - One 2017-06- 2017-07- 2017-09- TF / 18765 Management, Monitoring Post Open - National 0.00 Implement com todos os acessorios Quotations Envelope 30 18 16 and Evaluation ation para fixacao em parede e aquisicao de porta de vidro e aquisicao de vidro temperados para sala reunioes BR-CAA-3317-GO-RFQ / Aquisição de ar Component 3: Project Pending condicionado teto split com Request for Single Stage - One 2017-07- 2017-07- 2017-10- TF / 18765 Management, Monitoring Post Limited 0.00 Implement potencia trinta e seis mil Quotations Envelope 07 27 25 and Evaluation ation btus para estruturacao da sala reunioes projeto SUB 4-8 / CT4.8. Aquisição Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-04- 2017-08- 2018-05- 2017-08- 2018-06- de kits de materiais TF / 18765 and Adaptive Community Post Limited 205.74 Completed Quotations Envelope 13 18 03 17 13 16 didáticos. Initiatives SUB 16-1 / CQ16-1 Aquisição de mudas Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-03- espécies nativas do cerrado TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 13 24 para reflorestamento da Initiatives ation área de vinte nascentes. SUB 16-3 / CQ16-3 Aquisição de um veiculo para fiscalização de áreas Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-05- 2017-07- 2018-06- 2017-10- 2018-09- de nascentes isoladas e TF / 18765 and Adaptive Community Post Limited 9,999.02 Completed Quotations Envelope 29 08 23 08 01 04 recuperadas mobilização Initiatives atividades e gestão operacional do subprojeto SUB 16-10 / CQ16-10 Aquisição de 1920 estacas Component 1: Sustainable Request for Single Stage - One 2017-06- 2017-10- 2017-07- 2017-10- 2017-08- 2017-11- de eucalipto tratado para o TF / 18765 and Adaptive Community Post Limited 7,100.65 Completed Quotations Envelope 30 19 24 30 08 28 isolamento de vinte Initiatives nascentes na comunidade. Component 1: Sustainable Pending SUB 25-4 / CQ25.4 Request for Single Stage - One 2017-07- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Aquisição de um veiculo Quotations Envelope 02 09 08 Initiatives ation SUB 25-7 / CQ25.7 Component 1: Sustainable Pending Request for Single Stage - One 2017-07- 2017-07- 2018-01- Aquisição de materiais de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 06 28 24 expediente tela de projeção Initiatives ation pranchetas SUB 25-8 / CQ25.8 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- Aquisição de uma câmera TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 24 28 06 fotográfica digital Initiatives ation SUB 25-9 / CQ25.9 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- Aquisição de um notebook e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 28 16 um data show Initiatives ation SUB 25-11 / CQ25.11 Component 1: Sustainable Pending Request for Single Stage - One 2018-01- 2018-01- 2018-02- Aquisição de postes de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 02 24 23 eucalipto tratado para cerca Initiatives ation SUB 26-1 / CT26.1 Aquisição de gêneros alimentícios para as Component 1: Sustainable Pending atividade de proteção ao Request for Single Stage - One 2017-06- 2017-07- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement cerrado em Caceres Quotations Envelope 30 18 13 Initiatives ation acompanhamento de consultoria técnica para mapeamento e construção do viveiro de mudas SUB 2-8 / CT26.8 Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-05- 2017-07- 2018-05- 2017-09- 2018-06- Aquisicao de maquina TF / 18765 and Adaptive Community Post Limited 359.97 Completed Quotations Envelope 24 29 18 29 01 28 fotografica Initiatives SUB 45-2 / CT45.2 Aquisicao de veiculo tipo Component 1: Sustainable pick up para coleta de Request for Single Stage - One 2017-06- 2018-01- 2017-07- 2018-02- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Limited 10,257.25 Completed materia prima escoamento Quotations Envelope 25 18 25 15 23 24 Initiatives da produção e apoio as atividades de campo capacitação e monitoramento SUB 45-6 / CT45.6 Component 1: Sustainable Pending Aquisicao de moveis para Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement escritorio sendo estante de Quotations Envelope 27 24 23 Initiatives ation aco armário em aco cadeira e mesa SUB 45-17 / CT45.17 Component 1: Sustainable Pending Aquisicao de equipamento Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para a Unidade de Quotations Envelope 25 17 16 Initiatives ation Beneficiamento SUB 55-2 / CT55.2 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- Aquisicao de um Triturador TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 26 04 Forrageiro Initiatives ation SUB 55-3 / CT55.3 Component 1: Sustainable Pending Aquisicao de uma balanca Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement eletronica com capacidade Quotations Envelope 27 18 17 Initiatives ation de carga para 100 quilo SUB 55-7 / CT55.7 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-08- Aquisicao de tres carrinhos TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 27 26 de mao para coleta de Initiatives ation frutos SUB 55-8 / CT55.8 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-08- Aquisicao de duas estantes TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 17 21 metalicas em aco inox Initiatives ation SUB 55-10 / CT55.10 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-08- Aquisicao de uma Panela em TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 18 07 aco inoxidavel de trinta Initiatives ation litros SUB 56-2 / CT56.2 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-03- 2017-07- 2018-03- 2017-08- 2018-04- Aquisição de um fogão TF / 18765 and Adaptive Community Post Limited 175.37 Completed Quotations Envelope 02 07 17 07 26 06 industrial de quatro bocas Initiatives SUB 56-3 / CT56.3 Aquisição de ferramentas Component 1: Sustainable Pending para recuperação de áreas Request for Single Stage - One 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement degradadas como pá Quotations Envelope 10 08 12 Initiatives ation enxada carro de mão cavadeira entre outros Component 1: Sustainable SUB 56-4 / CT56.4 Request for Single Stage - One 2017-07- 2018-05- 2017-07- 2018-05- 2017-08- 2018-06- TF / 18765 and Adaptive Community Post Limited 260.10 Completed Aquisição de um notebook Quotations Envelope 01 24 20 24 29 23 Initiatives SUB 56-7 / CT56.7 Aquisição de mudas para Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-02- recuperação de áreas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 12 08 17 degradadas nas margens de Initiatives ation córregos com sistemas agroflorestais SUB 56-8 / CT56.8 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-11- 2017-07- 2017-11- 2017-08- 2017-12- Aquisicao de um portao de TF / 18765 and Adaptive Community Post Limited 205.67 Completed Quotations Envelope 01 14 18 28 17 22 correr com trilhos Initiatives SUB 56-9 / CT56.9 Component 1: Sustainable Aquisicao de materiais de Request for Single Stage - One 2017-07- 2017-11- 2017-07- 2017-11- 2017-08- 2017-12- TF / 18765 and Adaptive Community Post Limited 2,384.99 Signed construcao como sacos de Quotations Envelope 02 14 20 28 19 13 Initiatives cimento tijolos telhas outros necessarios SUB 56-16 / CT56.16 Aquisição de materiais pedagógicos para oito oficinas comunitária de Component 1: Sustainable Pending capacitação mapeamento e Request for Single Stage - One 2017-07- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement planejamento participativo e Quotations Envelope 03 28 27 Initiatives ation uma oficina de capacitação sobre recuperação e proteção de microbacias e construção de plano de trabalho SUB 61-4 / CQ61.4 Aquisição de moveis para Component 1: Sustainable escritório como quatro Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled armários um arquivo vinte Quotations Envelope 21 15 24 Initiatives e uma cadeiras uma estrutura com três cadeiras doze mesas SUB 61-5 / CQ61.5 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-09- Aquisição de uma estufa de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 25 18 27 secagem Initiatives SUB 61-8 / CQ61.8 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-09- Aquisicao de um Forno TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 21 30 Turbo com dez bandejas Initiatives SUB 61-10 / CQ61.10 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Aquisição de doze facas de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 23 22 inox Initiatives SUB 61-12 / CQ61.12 Aquisição de dez computadores um Notebook uma caixa de som para Component 1: Sustainable computador uma Request for Single Stage - One 2017-07- 2019-05- 2017-07- 2019-06- 2017-09- 2019-06- TF / 18765 and Adaptive Community Post Limited 7,443.53 Completed impressora um projetor Quotations Envelope 08 30 31 13 29 14 Initiatives multimídia cinco estabilizadores um modem cartuchos de tinta para impressora e uma calculadora eletrônica SUB 61-20 / CQ61.20 Aquisicão de gêneros alimentícios dos Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-12- comunitários para a TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 16 05 capacitação da valoração da Initiatives ation produção artesanal quilombola existente na Comunidade SUB 71-1 / CT71.1 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-07- 2017-09- Aquisição de um ônibus TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 31 14 usado de linha Initiatives SUB 75-1 / CQ75.1 Component 1: Sustainable Aquisição de equipamentos Request for Single Stage - One 2017-07- 2018-01- 2017-07- 2018-01- 2017-09- 2018-02- TF / 18765 and Adaptive Community Post Limited 1,214.25 Completed de informatica sendo Quotations Envelope 07 10 31 10 09 09 Initiatives Projetor multimídia e Notebook SUB 90-5 / CT90.5 Component 1: Sustainable Request for Single Stage - One 2017-07- 2019-10- 2017-07- 2019-10- 2017-09- 2019-11- Aquisição de embalagens de TF / 18765 and Adaptive Community Post Limited 3,706.64 Completed Quotations Envelope 08 03 28 16 11 11 conteúdo inferior ou igual a Initiatives um quilo Page 1 SUB 99-1 / CT99.1 Component 1: Sustainable Aquisicao de materiais Request for Single Stage - One 2017-07- 2018-01- 2017-07- 2018-02- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Limited 1,318.66 Completed eletricos e hidraulicos para Quotations Envelope 07 18 28 07 01 08 Initiatives implantacao das unidades produtivas SUB 99-2 / CT99.2 Aquisição de materiais para Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-01- 2017-07- 2018-02- 2017-09- 2018-03- infraestrutura para TF / 18765 and Adaptive Community Post Limited 26,237.06 Completed Quotations Envelope 09 18 28 06 11 08 implantação das unidades Initiatives produtivas SUB 99-3 / CT99.3 Aquisição de bens para Component 1: Sustainable implantação das unidades Request for Single Stage - One 2017-07- 2018-01- 2017-08- 2018-02- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Limited 372.93 Completed produtivas como bandejas Quotations Envelope 09 18 02 07 11 08 Initiatives de isopor bebedouros e comedouros para aves SUB 99-4 / CT99.4 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-01- 2017-08- 2018-02- 2017-09- 2018-03- Aquisição de bombas de TF / 18765 and Adaptive Community Post Limited 317.04 Completed Quotations Envelope 08 18 02 07 06 08 água submersa completa Initiatives novecentos w SUB 99-5 / CT99.5 Component 1: Sustainable Aquisição de materiais de Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-05- 2017-09- 2018-06- TF / 18765 and Adaptive Community Post Limited 915.03 Completed construção para Quotations Envelope 10 09 04 24 08 23 Initiatives implantação das unidades produtivas SUB 99-6 / CT99.6 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-01- 2017-08- 2018-02- 2017-09- 2018-04- Aquisição de Caixas de água TF / 18765 and Adaptive Community Post Limited 1,687.86 Completed Quotations Envelope 13 18 02 07 01 06 de cinco mil litros Initiatives SUB 99-7 / CT99.7 Component 1: Sustainable Aquisição de materiais de Request for Single Stage - One 2017-07- 2018-01- 2017-08- 2018-02- 2017-10- 2018-03- TF / 18765 and Adaptive Community Post Limited 5,102.58 Completed madereira para implantação Quotations Envelope 12 18 03 07 02 08 Initiatives das unidades produtivas SUB 99-8 / CT99.8 Aquisicao de insumos para Component 1: Sustainable Pending Request for Single Stage - One 2017-07- 2017-08- 2017-08- as unidades produtivas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 12 01 26 como Sacos de calcario Initiatives ation Substratos e Composto organico SUB 99-9 / CT99.9 Aquisicao de insumos para Component 1: Sustainable as unidades produtivas Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-05- 2017-09- 2018-06- TF / 18765 and Adaptive Community Post Limited 490.24 Completed como Pacote de semente de Quotations Envelope 10 09 07 24 06 23 Initiatives hortalica Sacos sementes de milho grao crioulo e Sacos de milho grao SUB 99-10 / CT99.10 Aquisicao de animais para Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-05- 2017-09- 2018-06- as unidades produtivas TF / 18765 and Adaptive Community Post Limited 620.21 Completed Quotations Envelope 14 09 07 24 06 25 como Galos reprodutores e Initiatives Galinhas caipira SUB 99-11 / CT99.11 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-05- 2017-09- 2018-06- Aquisicao de camera TF / 18765 and Adaptive Community Post Limited 825.48 Completed Quotations Envelope 16 22 07 22 16 21 fotografica profissional Initiatives SUB 99-12 / CT99.12 Component 1: Sustainable Pending Aquisicao de kit de material Request for Single Stage - One 2017-07- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement didatico para cursos oficinas Quotations Envelope 10 28 27 Initiatives ation e intercambios SUB 105-6 / CQ105.6 Aquisição de gêneros alimentícios comunitários em diversas comunidades Component 1: Sustainable Pending para os eventos Oficinas de 2017-07- 2017-07- 2017-08- 2018-07- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement formação em direitos 19 24 05 31 Initiatives ation territoriais Oficinas de elaboração do plano de gestão territorial Encontro da juventude e Caravana quilombola SUB 105-7 / CQ105.7 Aquisição de materiais Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-11- 2017-08- 2018-11- 2017-09- 2018-12- pedagógicos para a Oficina TF / 18765 and Adaptive Community Post Limited 1,402.58 Completed Quotations Envelope 17 14 07 22 01 21 de formação em direitos Initiatives territoriais SUB 105-8 / CQ105.8 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-04- 2017-08- 2018-04- 2017-09- 2018-04- Aquisição de quatro TF / 18765 and Adaptive Community Post Limited 1,665.16 Completed Quotations Envelope 16 09 04 09 08 24 maquinas fotográficas e Initiatives quatro GPS. SUB 109-3 / CT109.3 Component 1: Sustainable Pending Aquisição de materiais de Request for Single Stage - One 2017-07- 2017-08- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção para reforma do Quotations Envelope 20 07 05 Initiatives ation entreposto SUB 109-4 / CT109.4 Component 1: Sustainable Pending Aquisição de materiais de Request for Single Stage - One 2017-07- 2017-08- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement madeira para o telhado para Quotations Envelope 18 04 02 Initiatives ation reforma do entreposto SUB 109-6 / CT109.6 Component 1: Sustainable Pending Aquisição de estante Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement modular metálica com seis Quotations Envelope 16 13 27 Initiatives ation prateleiras para o entreposto SUB 109-7 / CT109.7 Aquisição de forno turbo Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-12- lenha para panificação com TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 16 20 dez esteiras e controle de Initiatives ation temperatura para o entreposto SUB 109-9 / CT109.09 Aquisição de mesa em aço Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- inox com estrutura tubular TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 12 26 total em aço inox para o Initiatives ation entreposto SUB 109-10 / CT109.10 Component 1: Sustainable Pending Aquisição de carrinho tipo Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement plataforma baixa em aço Quotations Envelope 13 06 10 Initiatives ation carbono para o entreposto SUB 109-11 / CT109.11 Aquisição de balança Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- eletrônica digital de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 20 29 bancada capacidade trinta Initiatives ation quilos para o entreposto SUB 109-14 / CT109.14 Aquisição de refeições dos comunitários para Primeiro e Segundo encontro para Component 1: Sustainable Pending elaboração do plano de 2017-08- 2017-09- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement comercialização Curso de 22 01 07 06 Initiatives ation boas praticas de beneficiamento e Encontro para construção dos acordos de boas praticas SUB 110-1 / CQ110.1 Aquisição de equipamentos para construção do viveiro e Component 1: Sustainable Request for Single Stage - One 2017-11- 2018-01- 2018-02- sala de armazenamento de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 24 16 25 sementes como Initiatives Pulverizadores Bomba plastica de cem litros SUB 110-5 / CQ110.5 Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-11- Aquisição de caixas d água TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 18 17 de dois mil litros Initiatives SUB 110-7 / CQ110.7 Component 1: Sustainable Aquisição de ship e Request for Single Stage - One 2017-07- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled equipamentos para Quotations Envelope 26 21 20 Initiatives transmissão de dados SUB 110-8 / CQ110.8 Component 1: Sustainable Request for Single Stage - One 2017-11- 2017-12- 2018-01- Aquisição de armário, mesa TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 22 13 27 e cadeira de escritório Initiatives SUB 110-9 / CQ110.9 Component 1: Sustainable Under Request for Single Stage - One 2017-11- 2020-07- 2017-12- 2018-02- Aquisição de carreta para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 10 22 05 trator Initiatives ation SUB 110-10 / CQ110.10 Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-01- 2017-10- 2018-02- 2017-11- 2018-02- Aquisição de cavadeira TF / 18765 and Adaptive Community Post Limited 90.13 Completed Quotations Envelope 20 25 16 07 20 23 articulada em aço Initiatives SUB 110-11 / CQ110.11 Aquisição de Notebook, Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-04- 2017-08- 2018-04- 2017-09- 2018-05- impressora, maquina TF / 18765 and Adaptive Community Post Limited 1,338.22 Completed Quotations Envelope 25 24 18 24 27 24 fotográfica, Aparelho de GPS Initiatives e Cartuchos impressora SUB 110-12 / CQ110.12 Component 1: Sustainable Aquisição de geladeira para Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled viveiro e sala de Quotations Envelope 30 23 27 Initiatives armazenamento de sementes SUB 110-15 / CQ110.15 Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-01- 2017-08- 2018-02- 2017-10- 2018-03- Aquisição de implemento TF / 18765 and Adaptive Community Post Limited 1,027.37 Completed Quotations Envelope 04 24 29 07 18 15 perfurador de solo Initiatives SUB 110-16 / CQ110.16 Component 1: Sustainable Request for Single Stage - One 2017-09- 2020-07- 2017-10- 2020-07- 2017-12- 2020-10- Aquisição de tanque TF / 18765 and Adaptive Community Post Limited 1,039.50 Completed Quotations Envelope 19 15 13 27 02 01 reboque Initiatives SUB 110-17 / CQ110.17 Component 1: Sustainable Request for Single Stage - One 2017-11- 2017-12- 2018-01- Aquisição de tambores de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 22 18 27 plastico de duzentos litros Initiatives SUB 110-18 / CQ110.18 Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-11- Aquisição de catraca para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 23 16 20 esticar arame Initiatives SUB 110-26 / CQ110.26 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-10- Aquisição de materiais TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 24 23 expediente Initiatives SUB 110-28 / CQ110.28 Component 1: Sustainable Aquisição de gênero 2017-11- 2017-12- 2018-01- 2018-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled alimentícios de 28 08 02 09 Initiatives comunitários para realizar capacitações SUB 116-7 / CT116.7 Aquisição de materiais de Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-12- 2017-08- 2018-12- 2017-10- 2019-01- ferragens para implantação TF / 18765 and Adaptive Community Post Limited 3,335.96 Completed Quotations Envelope 05 11 28 17 02 28 de unidade de Initiatives processamento e hortas SUB 116-8 / CT116.8 Component 1: Sustainable Aquisição de sementes Request for Single Stage - One 2017-08- 2018-12- 2017-08- 2018-12- 2017-09- 2018-12- TF / 18765 and Adaptive Community Post Limited 534.83 Completed diversas para Implantação Quotations Envelope 01 11 21 18 25 17 Initiatives de Hortas de Quintais SUB 116-10 / CT116.10 Aquisição de estercos de Component 1: Sustainable Pending gado para implantação de 2017-07- 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement hortas reflorestamento e 25 04 14 23 Initiatives ation enriquecimento de agroquintais SUB 116-14 / CT116.14 Component 1: Sustainable Aquisição de calcário para Request for Single Stage - One 2017-08- 2019-01- 2017-08- 2019-01- 2017-09- 2019-01- TF / 18765 and Adaptive Community Post Limited 17.88 Completed enriquecimento de Quotations Envelope 04 04 28 09 22 30 Initiatives Agroquintais SUB 116-15 / CT116.15 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- Aquisição de câmera TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 24 08 fotográfica Initiatives ation SUB 116-17 / CT116.17 Component 1: Sustainable Pending Aquisição de veiculo Request for Single Stage - One 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement motocicleta cento e Quotations Envelope 01 25 09 Initiatives ation cinquenta cilindradas SUB 116-18 / CT116.18 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- Aquisição de kit EPI para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 10 29 03 coleta de lixo Initiatives ation SUB 116-21 / CT116.21 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- Aquisição de dez kits de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 03 23 02 material didático para Initiatives ation eventos SUB 130-1 / CT130.1 Component 1: Sustainable Pending Aquisição de matérias Request for Single Stage - One 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement primas para beneficiamento Quotations Envelope 01 21 25 Initiatives ation do Jatobá Pequi e Baru SUB 130-3 / CT130.3 Component 1: Sustainable Aquisição de embalagens de Request for Single Stage - One 2017-07- 2018-12- 2017-08- 2018-12- 2017-09- 2019-01- TF / 18765 and Adaptive Community Post Limited 1,458.51 Completed vidraria para Jatobá Baru e Quotations Envelope 31 11 18 18 27 18 Initiatives Pequi SUB 130-4 / CT130.4 Component 1: Sustainable Under Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2017-10- Aquisição de empacotadeira TF / 18765 and Adaptive Community Post Limited 12,713.30 Implement Quotations Envelope 28 21 18 02 a Vácuo. Initiatives ation SUB 3-3 / Aquisição de equipamentos de Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-06- 2017-09- 2018-06- 2017-11- 2018-07- informática: notebook, TF / 18765 and Adaptive Community Post Limited 2,057.41 Completed Quotations Envelope 14 05 04 05 03 05 projeto multimídia, câmera Initiatives fotográfica, câmera filmadora. SUB 3-4 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- utensílios de copa e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 25 25 cozinha. Initiatives SUB 3-5 / Aquisição de Component 1: Sustainable ferramentas agrícolas Request for Single Stage - One 2017-08- 2018-07- 2017-09- 2018-09- 2017-10- 2018-10- TF / 18765 and Adaptive Community Post Limited 1,960.99 Completed manual (enxada, enxadão, Quotations Envelope 16 25 06 03 13 03 Initiatives machado, cavadeira, facão, etc). Component 1: Sustainable SUB 3-6 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled gêneros alimentícios. Quotations Envelope 05 11 11 Initiatives SUB 3-7 / Aquisição de kit Request for Single Stage - One 2017-08- 2017-08- 2017-10- TF / 18765 Post Limited 0.00 Canceled de material pedagógico. Quotations Envelope 11 28 27 Component 1: Sustainable SUB 3-8 / Aquisição de 20 Request for Single Stage - One 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled litros de graxa lubrificante Quotations Envelope 18 04 16 Initiatives Component 1: Sustainable SUB 3-9 / Aquisição de Request for Single Stage - One 2017-08- 2019-12- 2017-09- 2019-12- 2018-01- 2020-01- TF / 18765 and Adaptive Community Post Limited 11,540.78 Completed 4.000 mudas. Quotations Envelope 23 05 28 23 08 22 Initiatives Component 1: Sustainable SUB 47-3 / Aquisição de Request for Single Stage - One 2017-08- 2018-02- 2017-08- 2018-02- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Limited 424.04 Completed projetor multimídia Quotations Envelope 02 19 16 20 15 22 Initiatives Component 1: Sustainable SUB 47-4 / Aquisição de Request for Single Stage - One 2018-02- 2018-02- 2018-04- 2018-02- 2018-05- 2018-03- TF / 18765 and Adaptive Community Post Limited 321.32 Completed fogão a gás, 4 bocas Quotations Envelope 23 19 02 20 14 21 Initiatives SUB 47-6 / Aquisição de materiais de construção Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-08- 2017-10- 2018-09- 2017-11- 2018-10- para reforma da unidade de TF / 18765 and Adaptive Community Post Limited 8,474.42 Completed Quotations Envelope 28 20 02 24 13 24 beneficiamento de polpas Initiatives (areia, cimento, pedras, etc) Component 1: Sustainable SUB 74-12 / Aquisição de Request for Single Stage - One 2017-08- 2019-07- 2017-08- 2019-07- 2017-12- 2019-08- TF / 18765 and Adaptive Community Post Limited 834.65 Completed gêneros alimentícios Quotations Envelope 07 11 21 17 18 09 Initiatives Component 1: Sustainable SUB 28-10 / Aquisição de Request for Single Stage - One 2018-02- 2018-03- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled gêneros alimentícios Quotations Envelope 09 12 08 Initiatives SUB 28-11 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-02- 2017-09- 2018-03- 2018-07- 2018-04- mudas para instalação de TF / 18765 and Adaptive Community Post Limited 18,006.29 Completed Quotations Envelope 04 20 19 26 16 24 campos de frutíferas Initiatives Component 1: Sustainable SUB 113-10 / Aquisição de Request for Single Stage - One 2017-09- 2019-06- 2017-09- 2019-06- 2017-11- 2019-06- TF / 18765 and Adaptive Community Post Limited 1,853.70 Completed kits para apicultura. Quotations Envelope 12 03 29 18 30 28 Initiatives SUB 113-11 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- Kit de ferramentas para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 15 04 03 montagem de colméias Initiatives ation SUB 113-12 / Aquisição de kit de ferramentas para Component 1: Sustainable Request for Single Stage - One 2017-09- 2019-06- 2017-10- 2019-06- 2017-12- 2019-06- construção de cercas e TF / 18765 and Adaptive Community Post Limited 2,720.03 Completed Quotations Envelope 18 07 06 18 06 28 preparação de leitos para Initiatives plantio de mudas SUB 113-13 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- 2 kits para instalação de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 06 28 viveiros comunitários Initiatives ation Component 1: Sustainable SUB 113-14 / Aquisição de Request for Single Stage - One 2018-02- 2019-03- 2018-03- 2019-03- 2018-05- 2019-04- TF / 18765 and Adaptive Community Post Limited 2,675.68 Completed materiais de irrigação. Quotations Envelope 14 08 16 25 18 15 Initiatives SUB 113-16 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-06- 1.000 mudas de espécies da TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 05 05 06 região Initiatives ation Page 2 SUB 113-17 / Aquisição de Component 1: Sustainable Pending kit de materiais para Oficina Request for Single Stage - One 2018-03- 2018-04- 2018-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de Transferência de saberes Quotations Envelope 01 02 14 Initiatives ation entre anciões e jovens. Component 1: Sustainable SUB 113-18 / Aquisição de Request for Single Stage - One 2017-09- 2019-09- 2017-09- 2019-09- 2018-12- 2019-09- TF / 18765 and Adaptive Community Post Limited 445.91 Completed gêneros alimentícios Quotations Envelope 11 12 29 16 25 17 Initiatives SUB 120-10 / Aquisição de Barco em alumínio com 6 Component 1: Sustainable metros de comprimento Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 1,948.43 Completed com capacidade para Quotations Envelope 15 28 03 15 04 15 Initiatives receber motores de 30 a 40 hp de potência. SUB 120-11 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- 2018-02- motor de popa de 40hp de TF / 18765 and Adaptive Community Post Limited 3,967.92 Completed Quotations Envelope 18 28 05 20 05 19 potência. Initiatives SUB 120-12 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- 10 kits de equipamentos de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 09 07 proteção individual Initiatives ation Component 1: Sustainable SUB 120-13 / Aquisição de Request for Single Stage - One 2017-11- 2018-07- 2017-11- 2018-08- 2017-12- 2018-09- TF / 18765 and Adaptive Community Post Limited 1,212.20 Completed kit de coletas de sementes Quotations Envelope 03 23 20 16 29 15 Initiatives Component 1: Sustainable Pending SUB 135-8 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Gêneros alimentícios Quotations Envelope 21 06 06 Initiatives ation Component 1: Sustainable SUB 135-9 / Aquisição de Request for Single Stage - One 2017-09- 2017-09- 2017-10- 2017-09- 2017-11- 2017-10- TF / 18765 and Adaptive Community Post Limited 167.12 Completed uma caixa de som portátil Quotations Envelope 21 20 04 25 04 26 Initiatives SUB 135-10 / Aquisição de equipamentos - notebook - Component 1: Sustainable Aquisição de projetor Request for Single Stage - One 2017-09- 2017-12- 2017-10- 2017-12- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 1,676.86 Completed multimídia - Aquisição de Quotations Envelope 21 15 04 18 14 10 Initiatives câmera filmadora/fotográfica profissional SUB 135-11 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- kit de ferramentas para obra TF / 18765 and Adaptive Community Post Limited 1,178.62 Completed Quotations Envelope 23 16 08 16 18 05 em bio construção Initiatives SUB 135-12 / Aquisição de Component 1: Sustainable kit de ferramentas para Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- TF / 18765 and Adaptive Community Post Limited 202.20 Completed auxiliar na produção de Quotations Envelope 23 16 09 13 18 28 Initiatives sementes SUB 135-15 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- prensa para farinha de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 21 06 16 mandioca Initiatives ation SUB 135-18 / Aquisição de Component 1: Sustainable utensílios para estruturação Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- TF / 18765 and Adaptive Community Post Limited 64.21 Completed da cozinha do espaço Quotations Envelope 23 16 09 16 09 16 Initiatives multiuso SUB 135-19 / Aquisição de Component 1: Sustainable Pending kit de materiais para obra Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement do espaço mullti uso - Quotations Envelope 16 11 11 Initiatives ation materiais de construção - madeireira SUB 135-20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-10- 2017-10- 2017-11- 2017-11- 1000 m3 de hiper adobe TF / 18765 and Adaptive Community Post Limited 283.42 Completed Quotations Envelope 25 11 10 23 10 18 (bobina) Initiatives Component 1: Sustainable SUB 135-21 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2017-10- 2017-11- 2017-11- 2017-11- TF / 18765 and Adaptive Community Post Limited 1,870.59 Completed 145 telhas ecológicas Quotations Envelope 25 23 10 01 10 30 Initiatives Component 1: Sustainable SUB 42-23 / Aquisição de Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- 2017-12- TF / 18765 and Adaptive Community Post Limited 7,617.93 Completed 02 motocicletas Quotations Envelope 26 17 13 04 13 20 Initiatives SUB 42-24 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- 2017-12- Barco e Motor para apoiar TF / 18765 and Adaptive Community Post Limited 4,216.30 Completed Quotations Envelope 29 08 16 20 16 20 vigilância. Initiatives SUB 42-26 / Aquisição de Component 1: Sustainable armário em aço fechado e Request for Single Stage - One 2017-10- 2019-01- 2017-10- 2019-01- 2017-11- 2019-01- TF / 18765 and Adaptive Community Post Limited 634.76 Completed mesa para 6 lugares, com Quotations Envelope 02 14 18 23 18 31 Initiatives cadeiras. SUB 42-28 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-03- 2017-11- 2018-04- três Rádios Walk Talk Bivolt, TF / 18765 and Adaptive Community Post Limited 181.46 Completed Quotations Envelope 22 23 09 23 09 21 25 km Initiatives SUB 42-29 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-05- 2017-10- 2018-05- 2017-12- 2018-06- 01 notebook e de 01 TF / 18765 and Adaptive Community Post Limited 836.96 Completed Quotations Envelope 27 08 14 09 14 08 máquina fotográfica Initiatives SUB 42-30 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-10- 2017-10- 2017-11- Kit telefone rural com TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 10 27 27 internet. Initiatives ation SUB 30 - 15 / Aquisição de arame liso n°. 12 e 20 Rolos Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-08- 2017-10- 2018-08- 2018-01- 2018-09- de arame liso, sendo 1000 TF / 18765 and Adaptive Community Post Limited 2,266.03 Completed Quotations Envelope 13 01 30 14 01 12 metros cada rolo e bitola Initiatives 1/2''. Component 1: Sustainable SUB 42-31 / Aquisição de Request for Single Stage - One 2017-10- 2017-10- 2017-10- 2017-11- 2017-11- 2017-11- TF / 18765 and Adaptive Community Post Limited 102.55 Completed fogão industrial Quotations Envelope 03 25 20 06 20 08 Initiatives SUB 42-32 / Utensílios de cozinha: 5 panelas grandes, 4 bacias, 2 baldes plásticos, Component 1: Sustainable 2 garrafas térmicas de 5 Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled litros, 2 garrafas térmicas Quotations Envelope 23 10 10 Initiatives para café, 4 conchas grandes, 4 facas, 2 lampiões, 1 caixa térmica grande. SUB 42-33 / Aquisição de Kit de vestuário para ações Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-11- 2018-01- de vigilância e fiscalização TF / 18765 and Adaptive Community Post Limited 582.24 Completed Quotations Envelope 23 07 10 08 10 06 com 2 camisetas, 1 boné e Initiatives 1 colete de identificação de vigilância. SUB 42-34 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-06- 2017-10- 2018-07- 2017-11- 2018-08- kit padrão de energia TF / 18765 and Adaptive Community Post Limited 195.27 Completed Quotations Envelope 02 19 18 12 18 11 monofásico Initiatives SUB 42-35 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-06- 2017-10- 2018-07- 2017-11- 2018-08- kit para banheiro: Vaso TF / 18765 and Adaptive Community Post Limited 195.91 Completed Quotations Envelope 04 19 21 12 21 11 sanitário, chuveiro, Initiatives encanamento, etc. SUB 30 - 20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-01- 2017-10- 2018-03- 2017-11- 2018-03- 02 (dois) fogões industriais TF / 18765 and Adaptive Community Post Limited 534.47 Completed Quotations Envelope 02 30 19 02 20 31 quatro bocas. Initiatives Component 1: Sustainable SUB 42-36 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2017-10- 2017-11- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 3,545.52 Completed alimentos. Quotations Envelope 19 25 06 06 06 08 Initiatives SUB 30 - 21 / Aquisição de Component 1: Sustainable 02 (duas) Caixas d'água e Request for Single Stage - One 2017-10- 2018-08- 2017-10- 2018-08- 2017-11- 2018-09- TF / 18765 and Adaptive Community Post Limited 220.78 Completed 02 (dois) Carrinhos de mão Quotations Envelope 13 01 30 14 30 13 Initiatives galvanizado. SUB 30 - 24 / Aquisição de Component 1: Sustainable Impressora monocromática Request for Single Stage - One 2017-09- 2018-12- 2017-10- 2018-12- 2017-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 1,222.96 Completed a laser wi-fi, tonner e Quotations Envelope 29 19 16 19 16 04 Initiatives Computador desktop. SUB 30 - 26 / Aquisições de machados, podões e ferramentas semelhantes com gume- machados, Tijo Component 1: Sustainable furado 8 furos, Kit de Request for Single Stage - One 2017-10- 2018-08- 2017-10- 2018-08- 2017-11- 2018-09- TF / 18765 and Adaptive Community Post Limited 1,012.69 Completed ferramentas para Quotations Envelope 02 01 18 14 18 12 Initiatives construção do viveiro, Peças de treliça c/ 6 m de altura fig. nº 1 e 2, Janela veneziana 1,20m x 1m, Porta veneziana 2,10m x 0,80m. SUB 30 - 27 / Aquisição de Component 1: Sustainable jogos de pratos, talheres, Request for Single Stage - One 2017-09- 2018-12- 2017-10- 2018-12- 2017-11- 2019-01- TF / 18765 and Adaptive Community Post Limited 881.80 Completed utensílios de cozinha e Quotations Envelope 29 13 16 19 06 18 Initiatives panelas grandes. SUB 30 - 30 / Aquisição de generos alimenticios (kit: Component 1: Sustainable arroz, feijão, carne, Request for Single Stage - One 2017-09- 2018-06- 2017-10- 2018-07- 2019-12- 2018-08- TF / 18765 and Adaptive Community Post Limited 1,815.17 Completed macarrão, salada, sucos, Quotations Envelope 29 27 16 19 26 17 Initiatives sobremesas) refeições para os participantes. SUB 30 - 32 / Aquisição de Kit de material de escritório (papel a4, canetas, grampeador, pasta arquivo, Component 1: Sustainable envelopes, pasta Request for Single Stage - One 2017-09- 2018-07- 2017-10- 2018-08- 2017-11- 2018-09- TF / 18765 and Adaptive Community Post Limited 826.09 Completed catálogo),04 Kits material Quotations Envelope 29 26 16 14 16 12 Initiatives didático (caneta, papel a4, pasta, apostilas, papel pardo, pincel atômico), Kit de material de papelaria contendo caderno SUB 120-16 / Aquisição de gêneros alimentícios Component 1: Sustainable Pending adquiridos direto da 2017-12- 2017-12- 2018-01- 2018-07- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement comunidade para Realização 05 19 09 28 Initiatives ation do encontro anual dos coletores do tix SUB 4-4 / CT4.4. Aquisição Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-11- 2017-11- 2018-11- 2019-03- 2018-12- de gêneros alimentícios fora TF / 18765 and Adaptive Community Post Limited 467.92 Completed Quotations Envelope 07 13 10 22 05 20 comunidade. Initiatives SUB 4-5 / CT4.5. Aquisição de ferramentas e de arame Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-08- 2017-11- 2018-09- 2017-11- 2018-10- farpado de ferro ou aço TF / 18765 and Adaptive Community Post Limited 1,263.66 Completed Quotations Envelope 20 02 20 03 30 03 para cercamento e Initiatives isolamento das nascentes. SUB 4-7 / CT4.7. Aquisição Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-10- de equipamentos para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 24 26 16 brigada de combate a Initiatives incêndios. SUB 135-16 / Aquisição de Component 1: Sustainable Pending utensílios para estruturação Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement da cozinha do espaço Quotations Envelope 25 09 09 Initiatives ation multiuso - tacho para farinha SUB 135-13 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- kit para construção de TF / 18765 and Adaptive Community Post Limited 471.31 Completed Quotations Envelope 25 16 09 13 09 28 espaço multiuso Initiatives SUB 135-14 / Aquisição de Component 1: Sustainable Pending kit de materiais para Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção de espaço Quotations Envelope 25 09 09 Initiatives ation multiuso SUB 135-17 / Aquisição de Component 1: Sustainable Pending utensílios para estruturação Request for Single Stage - One 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement da cozinha do espaço Quotations Envelope 23 09 08 Initiatives ation multiuso SUB 4-3 / CT4.3. Aquisição Component 1: Sustainable Pending 2017-07- 2017-08- 2017-08- 2018-12- de gêneros alimentícios TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 11 02 25 18 direto da comunidade Initiatives ation SUB 56-17 / CT56.17 Aquisição de gêneros alimentícios direto da comunidade para oficinas Component 1: Sustainable comunitária de capacitação 2017-06- 2017-07- 2017-07- 2019-06- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled mapeamento e 29 08 18 18 Initiatives planejamento participativo e oficinas de construção do plano de gestão dos recursos hidricos comunitario Component 1: Sustainable Under SUB 56 - 19 / Aquisição de Request for Single Stage - One 2017-11- 2018-02- 2017-12- 2019-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Gêneros alimentícios Quotations Envelope 25 15 16 18 Initiatives ation SUB 134-4 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-02- 2017-12- 2018-03- 2018-01- 2018-03- ferramentas e utensilios TF / 18765 and Adaptive Community Post Limited 2,830.03 Completed Quotations Envelope 04 15 21 02 20 31 para construcao do viveiro Initiatives Component 1: Sustainable SUB 110 - 29 / Aquisição Request for Single Stage - One 2017-11- 2018-06- 2017-12- 2018-06- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 78.44 Completed de Trena Digital. Quotations Envelope 16 12 07 12 08 26 Initiatives Component 1: Sustainable SUB 134-5 / Aquisicao de Request for Single Stage - One 2017-12- 2018-11- 2017-12- 2018-11- 2018-02- 2018-12- TF / 18765 and Adaptive Community Post Limited 489.86 Completed compostos para viveiro Quotations Envelope 04 26 21 27 19 12 Initiatives SUB 134-6 / Aquisiacao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2017-12- 2018-01- sacolas plasticas para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 22 21 mudas e regador Initiatives Component 1: Sustainable Under SUB 134-7 / Aquisicao de Request for Single Stage - One 2017-11- 2018-04- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 575.36 Implement projetor e tela de projecao Quotations Envelope 29 04 21 19 Initiatives ation SUB 134-8 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-01- 2018-02- arquivo de aco ultra em TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 05 06 05 chapa Initiatives SUB 134-9 / Aquisicao de camera fotografica Component 1: Sustainable Request for Single Stage - One 2017-11- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- profissional com tripe TF / 18765 and Adaptive Community Post Limited 838.42 Completed Quotations Envelope 24 11 19 11 18 09 profissional e cartao de Initiatives memoria Component 1: Sustainable SUB 134-10 / Aquisição de Request for Single Stage - One 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled caixa de som amplificada Quotations Envelope 04 20 18 Initiatives SUB 134-11 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-01- 2017-12- 2018-01- 2018-02- 2018-02- computador notebook e TF / 18765 and Adaptive Community Post Limited 769.55 Completed Quotations Envelope 04 10 20 10 18 14 impressora multifuncional Initiatives Component 1: Sustainable SUB 134-12 / Aquisicao de Request for Single Stage - One 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled moto bomba a diesel Quotations Envelope 08 07 08 Initiatives Component 1: Sustainable SUB 134-13 / Aquisicao de Request for Single Stage - One 2017-11- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled vigota de madeira Quotations Envelope 30 18 17 Initiatives SUB 127-23 / Aquisição de generos alimenticios direto Component 1: Sustainable 2017-11- 2017-11- 2017-12- 2018-02- da comunidade durante a TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 17 30 14 12 construcao e reunioes do Initiatives Centro SUB 127-24 / Aquisicao de demais generos alimeniícios Component 1: Sustainable Request for Single Stage - One 2017-11- 2019-01- 2017-12- 2019-01- 2018-02- 2019-02- para consumo durante TF / 18765 and Adaptive Community Post Limited 492.64 Completed Quotations Envelope 29 07 15 28 13 26 reunioes para realizacao do Initiatives Centro de Revitalizacao SUB 127-25 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-12- 2018-01- 2018-12- 2018-01- 2019-01- armario arquivo em aco TF / 18765 and Adaptive Community Post Limited 172.57 Completed Quotations Envelope 08 20 02 20 22 20 para escritorio Initiatives SUB 127-27 / Aquisicao de equipamentos de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-05- 2017-12- 2018-05- 2018-02- 2018-06- informatica uma impressora TF / 18765 and Adaptive Community Post Limited 1,933.60 Completed Quotations Envelope 04 21 18 21 16 22 um notebook um projetor Initiatives multimidia e uma camera semi profissional SUB 127-28 / Aquisicao de Component 1: Sustainable Pending materiais de construcao Request for Single Stage - One 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para obra do Centro de Quotations Envelope 08 26 24 Initiatives ation Revitalizacao SUB 127-29 / Aquisicao de Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2017-12- 2018-01- roda d agua com vazao de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 27 26 8500l e instalacao Initiatives ation Component 1: Sustainable SUB 127-30 / Aquisicao de Request for Single Stage - One 2017-12- 2018-04- 2018-01- 2018-05- 2018-03- 2018-06- TF / 18765 and Adaptive Community Post Limited 3,527.67 Completed motocicleta Quotations Envelope 18 04 09 07 10 11 Initiatives SUB 127-31 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-01- 2018-03- geladeira e freezer vertical TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 20 15 16 capacidade de 900l Initiatives SUB 105-10 / CQ105.10 Component 1: Sustainable Request for Single Stage - One 2017-11- 2018-05- 2017-12- 2018-05- 2018-01- 2018-06- Aquisição de (04) quatro TF / 18765 and Adaptive Community Post Limited 503.81 Completed Quotations Envelope 20 16 11 16 27 15 caixas de som amplificadas Initiatives Page 3 Component 1: Sustainable SUB 105 - 12 / Aquisição Request for Single Stage - One 2017-11- 2018-02- 2017-12- 2018-02- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Limited 2,580.24 Completed de 05 (cinco) Notebooks. Quotations Envelope 20 05 13 05 27 05 Initiatives Component 1: Sustainable SUB 105 -13 / Aquisição de Request for Single Stage - One 2017-11- 2018-05- 2017-12- 2018-05- 2018-01- 2018-06- TF / 18765 and Adaptive Community Post Limited 1,058.41 Completed 04 (quatro) Projetores. Quotations Envelope 17 15 11 16 27 15 Initiatives SUB 105 -14 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-11- 2018-05- 2017-12- 2018-05- 2018-01- 2018-06- 04 (quatro) gravadores de TF / 18765 and Adaptive Community Post Limited 369.97 Completed Quotations Envelope 20 15 13 16 29 15 voz digitais. Initiatives SUB 88-1 / Aquisição de Component 1: Sustainable veículo, motor 1.0 ou 1.2 ou Request for Single Stage - One 2017-12- 2018-01- 2017-12- 2018-03- 2018-03- 2019-03- TF / 18765 and Adaptive Community Post Limited 9,836.30 Completed 1.3, ar condicionado, Quotations Envelope 11 24 28 07 09 07 Initiatives direção hidraulica, flex, way SUB 88-2 / Aquisição de Component 1: Sustainable aparelho de GPS rural para Request for Single Stage - One 2017-12- 2018-04- 2017-12- 2018-04- 2018-01- 2018-05- TF / 18765 and Adaptive Community Post Limited 332.21 Completed utilização do trabalho de Quotations Envelope 11 20 28 20 29 21 Initiatives campo SUB 88-3 / Aquisição de câmera fotográfica profissional com o kit: Component 1: Sustainable câmera, case, cartão de Request for Single Stage - One 2017-12- 2018-05- 2017-12- 2018-05- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Limited 744.21 Completed memória e tripé. Quotations Envelope 12 08 29 08 08 07 Initiatives Aquisição de gravador de voz digital com cartão de memória. SUB 88-4 / Aquisição de Dronner com câmera full HD e Wifi para registros Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-05- 2017-12- 2018-05- 2018-02- 2018-06- fotográficos e vídeo para TF / 18765 and Adaptive Community Post Limited 543.10 Completed Quotations Envelope 11 08 28 08 27 07 mapeamentos dos Initiatives potenciais e vulnerabilidades no território. SUB 88-5 / Aquisição de kits de materiais didáticos Component 1: Sustainable Request for Single Stage - One 2017-12- 2017-12- 2018-04- para atividades de gestão, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 12 29 09 monitoramento, Initiatives mobilização e oficinas Component 1: Sustainable SUB 88-6 / Aquisição de Request for Single Stage - One 2017-12- 2017-12- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled kits de Gênero alimentícios Quotations Envelope 12 29 06 Initiatives Component 1: Sustainable Community Pending SUB 142 -4 / Aquisição de 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement gerador 1200 w 15 29 08 09 15 17 Initiatives Development ation Component 1: Sustainable Community SUB 98 -5 / Aquisição de 2017-12- 2018-09- 2017-12- 2018-09- 2017-12- 2018-09- 2018-01- 2018-10- 2018-01- 2018-10- 2018-02- 2019-02- TF / 18765 and Adaptive Community Post Driven Limited 326.58 Completed Sacola de muda. 08 13 22 13 28 21 02 01 09 01 08 05 Initiatives Development SUB 142 -5 / Aquisição de Hd externo 1tb, Hd externo Component 1: Sustainable Community 2017-12- 2018-05- 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-03- 3tb No break, Impressora, TF / 18765 and Adaptive Community Post Driven Limited 1,289.75 Signed 15 11 29 11 08 11 09 11 15 14 17 Tinta para impressora Initiatives Development Computador desktop. SUB 142 -6 / Aquisição de itens para construção: Lima chata para enxada, Enxada, Rastelo, Cutelo, Foice, Component 1: Sustainable Community Pending 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- Matraca, Pá, Carrinho de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 15 29 08 09 15 15 mão, Regador, Facão, Initiatives Development ation Tambor de plástico 30L, Mangueira 100 ml, Mangueira micro perfurada. SUB 142 -7 / Aquisição de Component 1: Sustainable Community Câmera Digital para registro 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-06- TF / 18765 and Adaptive Community Post Driven Limited 597.80 Completed audiovisual: Cartão SD 32 18 07 01 07 10 07 12 07 18 08 19 23 Initiatives Development GB, Cartão SD 64 GB. SUB 98 - 8 / Sistema de Component 1: Sustainable Community energia solar para 2017-12- 2018-05- 2017-12- 2018-05- 2018-01- 2018-06- 2018-01- 2018-07- 2018-01- 2018-07- 2018-03- 2018-08- TF / 18765 and Adaptive Community Post Driven Limited 2,654.39 Completed bombeamento de água para 13 14 27 14 03 12 05 24 13 26 15 24 Initiatives Development o viveiro. SUB 98 - 9 / Aquisição Component 1: Sustainable Community 2017-12- 2018-09- 2017-12- 2018-09- 2018-01- 2018-09- 2018-01- 2018-09- 2018-01- 2018-09- 2018-03- 2018-10- Bomba dágua para TF / 18765 and Adaptive Community Post Driven Limited 1,637.88 Completed 13 13 27 13 03 14 08 24 15 25 16 24 irrigação. Initiatives Development SUB 98 -10 / Aquisição de ferramentas e equipamentos, sendo: Rolo Component 1: Sustainable Community tela de arame, Caixa dágua 2017-12- 2018-07- 2018-01- 2018-07- 2018-01- 2018-07- 2018-01- 2018-07- 2018-01- 2018-07- 2018-03- 2018-08- TF / 18765 and Adaptive Community Post Driven Limited 5,188.89 Completed polietileno capacidade 5, 20 10 03 10 12 17 15 25 22 26 23 24 Initiatives Development Sombrite , Pá, Kit irrigação, Rolo de arame liso, Fio para o sistema de energia solar. SUB 98 - 11 / Aquisição de Postes de eucalipto tratado , Component 1: Sustainable Community 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-06- 2018-01- 2018-07- 2018-01- 2018-07- 2018-03- 2018-08- Poste de madeira , Poste de TF / 18765 and Adaptive Community Post Driven Limited 3,286.40 Completed 22 22 05 22 15 12 16 25 22 25 23 25 madeira, Poste de madeira e Initiatives Development Poste de madeira. Component 1: Sustainable Community SUB 142 -10 / Aquisição de 2017-12- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 1,611.67 Completed freezer 19 01 02 01 11 01 13 01 19 01 19 31 Initiatives Development SUB 91-3 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-09- 2017-12- 2018-09- 2018-01- 2018-09- 2018-01- 2018-09- 2018-01- 2018-09- 2018-03- 2018-10- materiais para construção TF / 18765 and Adaptive Community Post Driven Limited 917.98 Completed 14 10 28 13 04 21 08 24 14 25 16 25 de viveiros Initiatives Development Component 1: Sustainable Community SUB 142 -11 / Aquisição de 2017-12- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 494.53 Completed liquidificadores 19 02 02 02 11 02 13 02 19 02 19 19 Initiatives Development SUB 98 - 12 / Aquisição de Component 1: Sustainable Community Kit epi - equipamento de 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-06- 2018-01- 2018-06- 2018-01- 2018-06- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Driven Limited 38.67 Completed proteção individual para os 22 30 05 30 12 04 13 13 23 18 22 17 Initiatives Development viveiristas e ajudante. Component 1: Sustainable Community SUB 98 -13 / Aquisição de 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-06- 2018-01- 2018-06- 2018-01- 2018-06- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Driven Limited 132.29 Completed ferramenta elétrica. 22 30 05 30 12 04 16 13 23 18 22 18 Initiatives Development Component 1: Sustainable Community Pending SUB 142 -12 / Aquisição de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement embalagens 20 03 12 15 20 20 Initiatives Development ation SUB 98 - 14 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-06- 2018-01- 2018-06- 2018-01- 2018-06- 2018-02- Cavadeira articulada em TF / 18765 and Adaptive Community Post Driven Limited 47.92 Signed 22 30 05 30 12 04 15 13 23 18 22 aço. Initiatives Development SUB 142 -13 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-05- gravador de áudio e TF / 18765 and Adaptive Community Post Driven Limited 414.70 Completed 20 08 03 08 12 08 15 08 20 08 20 08 microfone , para gravação Initiatives Development de áudio SUB 125 - 9 / Aquisição de material de escritório as as Component 1: Sustainable Community Pending 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- reuniões bimestrais e TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 20 03 12 15 22 22 semestrais e para confecção Initiatives Development ation dos etno mapas. SUB 91-4 / Aquisição de Component 1: Sustainable Community Pending 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- materiais para produção de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 14 28 04 08 14 14 mudas Initiatives Development ation SUB 125 -10 / Aquisição de 40 toneladas de calcário Component 1: Sustainable Community Pending para correção do ph do solo 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para ser entregue na Aldeia 20 03 15 15 22 21 Initiatives Development ation Bananal Distrito de Taunay - Aquidauana -MS. SUB 91-5 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-04- 2017-12- 2018-04- 2018-01- 2018-04- 2018-01- 2018-05- 2018-01- 2018-05- 2018-03- 2018-06- equipamentos para TF / 18765 and Adaptive Community Post Driven Limited 4,806.80 Completed 15 06 29 06 05 18 09 07 15 07 17 06 bombeamento de água Initiatives Development SUB 125 - 11 / Aquisição de equipamentos de informática, sendo: 02 Component 1: Sustainable Community 2017-12- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- 2018-03- notebook, 01 máquinas TF / 18765 and Adaptive Community Post Driven Limited 2,272.11 Completed 20 28 03 23 15 23 15 23 22 23 23 20 fotográfica, 01 GPS, 01 Initiatives Development Projetor multimídia - data show e 01 Impressora multifuncional. SUB 125 - 12 / Aquisição Component 1: Sustainable Community Pending de rama de mandioca 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement amarela, para ser plantada 17 31 02 12 19 20 Initiatives Development ation nas áreas enriquecidas. Component 1: Sustainable Community Pending SUB 91-6 / Aquisição de 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement terra vegetal 15 29 05 09 15 15 Initiatives Development ation SUB 91-8 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-03- 2018-01- 2018-03- 2018-01- 2018-04- 2018-01- 2018-04- 2018-01- 2018-04- 2018-04- 2018-05- máquinas e equipamentos TF / 18765 and Adaptive Community Post Driven Limited 26,959.48 Completed 20 22 03 22 10 13 14 16 20 26 21 08 agrícolas Initiatives Development SUB 93 - 4 / Aquisição de caixa de som com Component 1: Sustainable Community Pending microfone para realização 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement de reuniões com a 18 01 08 12 19 21 Initiatives Development ation comunidade afim de promover a boa execução do projeto. SUB 143 -2 / Aquisição de Component 1: Sustainable Community 2018-01- 2019-01- 2018-01- 2019-01- 2018-01- 2019-01- 2018-01- 2019-01- 2018-01- 2019-01- 2018-03- 2019-02- kits de material para TF / 18765 and Adaptive Community Post Driven Limited 474.55 Completed 10 10 20 23 25 23 29 24 30 24 02 27 acampamento. Initiatives Development Component 1: Sustainable Community Pending SUB 143 -3 / Aquisição de 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement fitas para filmadora 10 20 27 29 30 02 Initiatives Development ation SUB 124 - 9 / Aquisição de enxadas com cabo, aquisição de roçadeiras semimecanizadas, aquisição Component 1: Sustainable Community 2018-01- 2018-06- 2018-02- 2018-06- 2018-02- 2018-06- 2018-02- 2018-07- 2018-03- 2018-07- 2018-04- 2018-08- de cavadeiras, aquisição de TF / 18765 and Adaptive Community Post Driven Limited 818.96 Completed 30 08 13 08 24 26 24 10 03 25 02 04 limas para amolar Initiatives Development ferramentas, aquisição de enxadões aquisição de 10 f e outros. SUB 143 -4 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-08- 2018-02- 2018-09- 2018-02- 2018-09- 2018-04- 2018-11- duas motocicletas on-off TF / 18765 and Adaptive Community Post Driven Limited 6,914.67 Completed 05 10 24 10 02 11 03 03 05 06 07 05 Road. Initiatives Development Component 1: Sustainable Community Pending SUB 143 -5 / Aquisição de 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement gêneros alimentícios. 15 24 02 03 05 13 Initiatives Development ation SUB 143 -6 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-08- 2018-02- 2018-09- 2018-02- 2018-09- 2018-04- 2018-11- Motor de popa de 15hp com TF / 18765 and Adaptive Community Post Driven Limited 2,224.49 Completed 16 13 30 14 06 20 09 03 12 06 13 06 motor 2t Initiatives Development Component 1: Sustainable Community SUB 143 - 9 / Aquisição de 2018-01- 2018-08- 2018-02- 2018-08- 2018-02- 2018-08- 2018-02- 2018-09- 2018-02- 2018-09- 2018-04- 2018-10- TF / 18765 and Adaptive Community Post Driven Limited 1,738.53 Completed Barco. 20 13 03 14 10 15 12 03 16 06 17 06 Initiatives Development Component 1: Sustainable Community SUB 143 - 8 / Aquisição de 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Driven Limited 725.65 Completed aparelho de GPS. 16 24 30 24 08 24 09 24 12 24 13 23 Initiatives Development SUB 143 -7 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-04- 2018-06- câmera fotográfica e TF / 18765 and Adaptive Community Post Driven Limited 1,187.94 Completed 16 23 30 24 08 24 09 24 12 24 13 23 Aquisição de Notebook Initiatives Development SUB 100 -8 / Aquisição de Component 1: Sustainable Community equipamentos de 2018-01- 2018-03- 2018-01- 2018-04- 2018-01- 2018-04- 2018-01- 2018-04- 2018-02- 2018-04- 2018-03- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 517.01 Completed informática: HD Externo 1TB 05 12 19 11 29 11 30 16 05 11 08 11 Initiatives Development : projetor portátil. Component 1: Sustainable Community SUB 100 - 2 / Aquisição de 2017-12- 2018-07- 2018-01- 2018-07- 2018-01- 2018-07- 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-09- TF / 18765 and Adaptive Community Post Driven Limited 2,032.07 Completed roçadeira e moto serra . 20 09 03 09 12 11 15 08 22 16 21 07 Initiatives Development Component 1: Sustainable Community Pending SUB 100 - 4 / Aquisição de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement kit ferramentas agrícolas. 20 03 12 15 22 21 Initiatives Development ation Component 1: Sustainable Community SUB 100 - 5 / Aquisição de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled kit material do viveiro. 20 03 10 15 22 23 Initiatives Development Component 1: Sustainable Community SUB 100 - 6 / Aquisição de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled gêneros alimentícios 20 03 10 15 22 22 Initiatives Development SUB 100 -7 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-04- 2018-01- 2018-04- 2018-01- 2018-04- 2018-01- 2018-04- 2018-02- 2018-04- 2018-03- 2018-04- caixa de som amplificada TF / 18765 and Adaptive Community Post Driven Limited 154.02 Completed 05 09 19 10 29 10 30 10 05 11 08 30 com usb Initiatives Development SUB 85 -14 / Aquisição de notebook Impressora laser Component 1: Sustainable Community 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- 2018-05- multifuncional e toner TF / 18765 and Adaptive Community Post Driven Limited 1,237.90 Completed 10 20 24 20 02 20 05 21 10 21 12 02 impressora, projetor Initiatives Development portátil, Tela de Projeção Component 1: Sustainable Community SUB 85 - 7 / Aquisição de 2018-01- 2018-08- 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-08- 2018-02- 2018-09- 2018-04- 2018-10- TF / 18765 and Adaptive Community Post Driven Limited 3,351.10 Completed motocicleta . 08 07 22 07 29 07 02 27 09 06 10 05 Initiatives Development SUB 85 -12 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- caixa de som amplificada TF / 18765 and Adaptive Community Post Driven Limited 212.34 Completed 10 08 24 19 02 19 05 19 10 20 23 22 com microfone . Initiatives Development Component 1: Sustainable Community SUB 85 - 8 / Aquisição de 2018-01- 2019-10- 2018-01- 2019-10- 2018-01- 2019-10- 2018-02- 2019-10- 2018-02- 2019-10- 2018-05- 2020-01- TF / 18765 and Adaptive Community Post Driven Limited 886.99 Completed materiais para irrigação. 08 23 22 23 31 23 02 30 09 31 21 21 Initiatives Development SUB 85 -11 / Aquisição de Porteira,Ripas de madeira Component 1: Sustainable Community 2018-01- 2019-02- 2018-01- 2019-02- 2018-01- 2019-03- 2018-02- 2019-03- 2018-02- 2019-03- 2018-07- 2019-03- mista, Postes de eucalipto TF / 18765 and Adaptive Community Post Driven Limited 4,107.59 Completed 08 27 22 27 31 12 02 13 08 13 09 28 tratado e Esticadores de Initiatives Development cerca ,para estrutura de viveiro. SUB 85 - 9 / Aquisição de materiais: Sombrite, bolas de arame, Prego, Prego com Component 1: Sustainable Community 2018-01- 2018-08- 2018-01- 2018-08- 2018-01- 2018-09- 2018-02- 2018-09- 2018-02- 2018-09- 2018-05- 2018-10- cabeça, Arame, Materiais de TF / 18765 and Adaptive Community Post Driven Limited 4,939.45 Completed 08 07 22 09 29 05 02 11 09 24 21 24 construção: areia, cimento, Initiatives Development pedra, ferragens, Cabo de aço e outros. SUB 85 -10 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-08- 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-09- 2018-02- 2018-09- 2018-05- 2018-10- materiais elétricos e TF / 18765 and Adaptive Community Post Driven Limited 4,808.28 Completed 08 08 22 09 31 22 02 12 08 24 21 24 hidráulicos e elétrico. Initiatives Development AI1 - 5 / Aquisição de materiais Component 1: Sustainable Community Pending consumo/didáticos para 2017-12- 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement realizar 02 articuladores 06 18 26 27 03 23 Initiatives Development ation indígenas, que terão bases de trabalho em Palmas - TO e Campo Grande. AI3 - 4 / Aquisição de kits Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- de material de didático para TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 22 05 12 16 23 26 oficina. Initiatives Development ation SUB 134-3 / Aquisição de Gêneros alimentícios para Component 1: Sustainable atividade de reunião de 2017-11- 2018-11- 2017-11- 2018-11- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled planejamento pratico das 17 26 22 26 19 17 Initiatives atividades e inicio do registro audiovisual. SUB 116-4 / CT116.4 Aquisição de material de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-10- madeireira para implantação TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 28 27 de unidade de Initiatives processamento e hortas SUB 116-12 / CT116.12 Component 1: Sustainable Pending Aquisição de utensílios para Request for Single Stage - One 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement implantação de unidades de Quotations Envelope 08 28 02 Initiatives ation processamento SUB 116-5 / CT116.5 Component 1: Sustainable Aquisição de barros para 2017-07- 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled implantação de unidade de 27 02 14 03 Initiatives processamento e hortas SUB 116-6 / CT116.6 Aquisição de bens para Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Implantação de Hortas de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 23 27 Quintais como Bombas e Initiatives Caixa d água dez mil litros SUB 134-2 / Aquisição de gêneros alimentícios para Component 1: Sustainable preparo de refeições, para 2017-11- 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled trabalhadores que atuarão 24 01 21 19 Initiatives no mutirão de construção do viveiro. Page 4 BR-CAA-39549-GO-RFQ / Aquisicao de equipamentos de informatica para execucao projeto DGM Component 3: Project Pending sendo 01 equipamento Request for Single Stage - One 2018-01- 2018-02- 2018-04- TF / 18765 Management, Monitoring Post Limited 0.00 Implement externo de seguranca e Quotations Envelope 19 05 06 and Evaluation ation backup do Banco de Dados do Sistema do projeto e 01 HD externo para armazenamento dos produtos de comunicacao do projeto. SUB 134 -15 / Aquisição de gêneros alimentícios para Component 1: Sustainable Community preparo de refeições, para 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled trabalhadores que atuarão 06 20 29 02 08 09 Initiatives Development no mutirão de construção do viveiro. SUB 116-11 / CT116.11 Aquisição de itens para Component 1: Sustainable implantação da unidade de Request for Single Stage - One 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled processamento como Portas Quotations Envelope 07 25 24 Initiatives com caixile Dobradicas e Basculantes SUB 116-13 / CT116.13 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Aquisição de extintor contra TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 28 27 incêndio Initiatives SUB 116-19 / CT116.19 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Aquisição de forrageira TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 29 cinco kw Initiatives Component 1: Sustainable SUB 116-20 / CT116.20 Request for Single Stage - One 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Aquisicao de rocadeiras Quotations Envelope 04 24 23 Initiatives SUB 142-14 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-04- 2018-06- generos alimenticios para TF / 18765 and Adaptive Community Post Driven Limited 1,785.45 Completed 15 18 24 14 05 14 09 21 16 28 17 25 plantio e oficinas Initiatives Development SUB 116-9 / CT116.9 Aquisição de mudas Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-11- 2017-08- 2018-12- 2017-10- 2019-01- diversas para TF / 18765 and Adaptive Community Post Limited 526.43 Completed Quotations Envelope 03 29 22 17 11 16 Enriquecimento de Initiatives Agroquintais com SAF Biodiversos SUB 116-34 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-11- 2018-01- 2018-11- 2018-02- 2018-12- 2018-02- 2018-12- 2018-02- 2018-12- 2018-04- 2019-01- mudas para reflorestamento TF / 18765 and Adaptive Community Post Driven Limited 3,403.17 Completed 15 30 25 30 07 14 09 14 15 14 18 14 e cercamento de rio Initiatives Development SUB 110-6 / CQ110.6 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2018-02- Aquisição de sacos para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 29 21 17 mudas Initiatives SUB 93 - 2 / Aquisição de Component 1: Sustainable Community equipamentos, sendo 01 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled aparelho GPS e 01 Telão de 18 01 08 10 19 20 Initiatives Development projetor para data show. Component 1: Sustainable Community SUB 105 -15 / Aquisição de 2018-01- 2019-03- 2018-01- 2019-03- 2018-02- 2019-03- 2018-02- 2019-03- 2018-02- 2019-03- 2018-03- 2019-04- TF / 18765 and Adaptive Community Post Driven Limited 462.74 Completed 06 cadeiras giratórias. 11 18 22 20 03 20 05 21 12 21 15 30 Initiatives Development SUB 91-7 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-02- 2018-04- 2018-02- 2018-05- 2018-05- 2018-09- materiais para o sistema de TF / 18765 and Adaptive Community Post Limited 8,763.53 Completed Quotations Envelope 02 06 21 07 22 28 bombeamento de água Initiatives Component 1: Sustainable Community Pending SUB 91-2 / Fornecimento 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement de Óleo Diesel 22 02 13 15 22 23 Initiatives Development ation SUB 93 - 3 / Aquisição de insumos para horticultura Component 1: Sustainable Community 2018-01- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-02- 2018-07- 2019-03- (ferramentas manuais, TF / 18765 and Adaptive Community Post Driven Limited 386.28 Completed 18 23 01 23 08 28 12 31 19 01 19 12 sementes, sombrite, tela Initiatives Development lateral, kit irrigação. Component 1: Sustainable Community SUB 93-5 / Aquisição de 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled Sacos para Mudas 18 01 08 10 19 19 Initiatives Development Component 1: Sustainable Community SUB 93-6 / Aquisição de 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled Brita 18 01 08 10 19 19 Initiatives Development Component 1: Sustainable Community SUB 93-7 / kit EPI (Botas, 2018-01- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-07- 2019-02- TF / 18765 and Adaptive Community Post Driven Limited 154.17 Completed luvas, óculos,avental) 18 04 01 04 08 10 10 14 19 15 19 14 Initiatives Development Component 1: Sustainable SUB 120-9 / Aquisição de 2017-09- 2017-09- 2017-10- 2019-05- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled gêneros alimentícios 05 19 06 29 Initiatives SUB 130-2 / CT130.2 Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-12- 2017-08- 2018-12- 2017-10- 2019-01- Aquisição de embalagens TF / 18765 and Adaptive Community Post Limited 1,051.87 Completed Quotations Envelope 02 11 22 18 01 10 diversas de plastico Initiatives Component 1: Sustainable SUB 130 - 9 / CT130.9 Request for Single Stage - One 2018-01- 2018-12- 2018-02- 2018-12- 2018-03- 2019-01- TF / 18765 and Adaptive Community Post Limited 1,147.55 Completed Embalagens de papelão. Quotations Envelope 29 12 24 18 31 18 Initiatives Component 1: Sustainable SUB 47-7 / Aquisição de Request for Single Stage - One 2018-02- 2018-03- 2018-03- 2018-03- 2018-05- 2018-05- TF / 18765 and Adaptive Community Post Limited 26,979.80 Completed um veículo, tipo caminhão. Quotations Envelope 19 09 27 23 28 28 Initiatives SUB 25-1 N / Aquisição de Component 1: Sustainable um carro de passeio visando Request for Single Stage - One 2018-02- 2018-07- 2018-03- 2018-08- 2018-05- 2018-09- TF / 18765 and Adaptive Community Post Limited 12,685.96 Completed viabilizar atividades do Quotations Envelope 26 30 16 16 15 17 Initiatives projeto. SUB 25-2 N / Aquisição de um Notebook, Datashow, Component 1: Sustainable Request for Single Stage - One 2018-03- 2018-09- 2018-03- 2018-09- 2018-05- 2018-10- tela com suporte para TF / 18765 and Adaptive Community Post Limited 1,237.38 Completed Quotations Envelope 15 03 31 04 10 18 projeção de data show e Initiatives câmera fotográfica SUB 25-5 N / Aquisição de ferramentas e materiais, botas para serviço, chapéus para serviço, bolas de arame Component 1: Sustainable Request for Single Stage - One 2018-03- 2018-10- 2018-04- 2018-11- 2018-05- 2018-12- para cerca de 500 metros, TF / 18765 and Adaptive Community Post Limited 3,569.05 Completed Quotations Envelope 19 17 03 06 03 05 grampos de fio curvado, Initiatives cavadeira, facão, enxada com cabo, enxadão com cabo, pé-de-cabra, regador. SUB 16-17 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-03- 2018-03- 2018-04- 2018-04- 2018-05- 2018-05- arames e distanciadores TF / 18765 and Adaptive Community Post Limited 1,932.27 Completed Quotations Envelope 05 09 11 13 11 14 para cercamento. Initiatives Component 1: Sustainable SUB 47-9 / Aquisição de Request for Single Stage - One 2018-04- 2018-04- 2018-05- 2018-05- 2018-07- 2018-07- TF / 18765 and Adaptive Community Post Limited 3,854.26 Completed carroceria para caminhão. Quotations Envelope 06 10 12 04 13 04 Initiatives SUB 25-3 N / Aquisição de gêneros alimentícios de fornecedores para capacitação, Formação da Component 1: Sustainable Pending comunidade sobre Request for Single Stage - One 2018-03- 2018-04- 2018-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement recuperação ambiental, Quotations Envelope 30 24 24 Initiatives ation Cercamento de nascentes, Oficina sobre plantio de mudas, Seminário temático em agroecologia e avaliação SUB 25-4 N / Aquisição de mudas-plantas apropriadas Component 1: Sustainable Pending Request for Single Stage - One 2018-03- 2018-04- 2018-06- para recuperação de áreas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 03 02 degradadas com frete Initiatives ation incluído. SUB 25-6 N / Aquisição Component 1: Sustainable Request for Single Stage - One 2018-04- 2018-10- 2018-05- 2018-11- 2018-06- 2018-12- poste de eucalipto tratado TF / 18765 and Adaptive Community Post Limited 3,399.94 Completed Quotations Envelope 12 23 12 22 11 26 para cercamento Initiatives SUB 129 - 2 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2018-05- 2018-06- 2018-08- 3 máquinas para furar TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 14 13 sementes. Initiatives ation Component 1: Sustainable Pending SUB 129 - 3 / Aquisição de Request for Single Stage - One 2018-05- 2018-06- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement duas máquinas de costura. Quotations Envelope 07 14 13 Initiatives ation Component 1: Sustainable SUB 129 - 4 / Aquisição de Request for Single Stage - One 2018-05- 2018-06- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled três pirógrafos. Quotations Envelope 07 14 13 Initiatives Component 1: Sustainable Pending SUB 129 - 15 / Aquisição Request for Single Stage - One 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de kit para expedição . Quotations Envelope 23 30 29 Initiatives ation SUB 55-5 / CT55.5 Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-03- 2017-07- 2018-03- 2017-08- 2018-04- Aquisição de dois Freezers TF / 18765 and Adaptive Community Post Limited 905.73 Completed Quotations Envelope 27 27 25 27 29 23 horizontais. Initiatives SUB 135- 7 / Aquisição de Component 1: Sustainable Pending 2018-03- 2018-03- 2018-04- 2018-06- veículo, 4x4, motor a diesel TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 13 18 22 21 e carroceria. Initiatives ation SUB 135-7 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2017-11- veículo, 4x4, motor a diesel TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 22 26 09 08 e carroceria. Initiatives SUB 123 -5 / Aquisição de Component 1: Sustainable kit de materiais para manejo Request for Single Stage - One 2018-03- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled do forno para produção de Quotations Envelope 28 10 11 Initiatives cerâmica. SUB 123 -7 / Aquisição de Component 1: Sustainable kit de material para Request for Single Stage - One 2018-03- 2019-02- 2018-04- 2019-02- 2018-06- 2019-03- TF / 18765 and Adaptive Community Post Limited 501.89 Completed silkscreen (tela, tinta,rodo, Quotations Envelope 28 07 10 19 11 11 Initiatives papel vegetal, calha etc..) SUB 123 -9 / Aquisição de Component 1: Sustainable Barco de alumínio de Request for Single Stage - One 2018-03- 2018-08- 2018-04- 2018-09- 2018-05- 2018-10- TF / 18765 and Adaptive Community Post Limited 5,377.71 Completed aproximadamente 5 metros Quotations Envelope 28 14 10 06 31 06 Initiatives com motor. SUB 123 -10 / Aquisição de impressora de mesa multifuncional (R$ 500,00). Component 1: Sustainable Aquisição de computador - Request for Single Stage - One 2018-03- 2018-06- 2018-04- 2018-06- 2018-06- 2018-07- TF / 18765 and Adaptive Community Post Limited 1,438.38 Completed 2 notebook completo (R$ Quotations Envelope 28 04 10 05 11 05 Initiatives 4000,00), Aquisição de câmera fotográfica (R$ 1000,00). SUB 123 -12 / Component 1: Sustainable Request for Single Stage - One 2018-03- 2018-04- 2018-04- Equipamentos para instação TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 10 26 de internet a rádio. Initiatives SUB 129 - 6 / Aquisição de Component 1: Sustainable Under materiais de construção Request for Single Stage - One 2018-07- 2020-01- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para construção do ateliê de Quotations Envelope 23 23 30 29 Initiatives ation produção de artesanato. SUB 129 - 1 / Aquisição de gêneros alimentícios para os agentes de Component 1: Sustainable Pending Request for Single Stage - One 2018-05- 2018-06- 2018-08- monitoramento durante as TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 14 13 expedições e alimentação Initiatives ation dos participantes em 3 oficinas que serão realizadas pelo projeto. SUB 129 - 5 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-05- 2018-06- 2018-08- uma bancada de apoio para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 14 13 equipamentos. Initiatives SUB 56-1 / CT56.1 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-05- 2017-07- 2018-06- 2017-08- 2018-07- Aquisição cadeiras para TF / 18765 and Adaptive Community Post Limited 321.36 Completed Quotations Envelope 01 25 18 14 27 13 estrutura da sede do Initiatives projeto. SUB 56- 19 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-04- 2018-05- 2018-05- 2018-04- 2018-06- 2018-05- pratos, copos, jogo de TF / 18765 and Adaptive Community Post Limited 510.25 Completed Quotations Envelope 28 30 21 10 20 24 panelas e colheres Initiatives SUB 88-9 / Aquisição de Component 1: Sustainable combustível e lubrificantes Request for Single Stage - One 2018-04- 2018-05- 2018-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para execução das Quotations Envelope 30 21 17 Initiatives atividades do projeto. SUB 142-17 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2018-04- 2018-05- 2018-06- miçangas para produção de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 25 24 artesanato. Initiatives ation Component 1: Sustainable SUB 130-5 / Aquisição de Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-06- 2017-09- 2018-07- TF / 18765 and Adaptive Community Post Limited 9,378.99 Completed moinho de pedra Quotations Envelope 31 18 21 18 30 16 Initiatives Component 1: Sustainable SUB 130-10 / Aquisição de Request for Single Stage - One 2018-04- 2018-05- 2018-05- 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 5,579.26 Completed moinho de facas Quotations Envelope 30 18 20 11 18 09 Initiatives SUB 4-20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-04- 2018-07- 2018-05- 2018-07- 2018-07- 2018-08- carroceria para veículo tipo TF / 18765 and Adaptive Community Post Limited 1,867.07 Completed Quotations Envelope 30 09 21 16 20 15 caminhão leve Initiatives BR-CAA-39550-GO-RFQ / Aquisição de 19 equipamentos portátil de Component 1: Sustainable Under informática - tablets - para Request for Single Stage - One 2018-04- 2018-06- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement acompanhamento de metas Quotations Envelope 27 20 12 11 Initiatives ation e atividades dos subprojetos - 2º edital de seleção de propostas DGM/FIP/BRASIL SUB 125 -8 / Aquisição de máquinas-trator agrícola Component 1: Sustainable Request for Single Stage - One 2018-05- 2018-10- 2018-06- 2018-10- 2018-07- 2019-02- para execução do projeto TF / 18765 and Adaptive Community Post Limited 29,811.62 Completed Quotations Envelope 12 08 01 23 31 23 nas áreas degradadas, Initiatives nascente e reboque de trator. Component 1: Sustainable SUB 4-2 / CT4.2. Aquisição Request for Single Stage - One 2018-05- 2018-05- 2018-06- 2018-06- 2018-11- 2018-10- TF / 18765 and Adaptive Community Post Limited 32,555.05 Completed de veiculo novo Quotations Envelope 12 29 01 22 28 20 Initiatives SUB 61-7 / CQ61.7 Component 1: Sustainable Pending Request for Single Stage - One 2017-07- 2017-08- 2017-09- Aquisição de Embaladora a TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 21 30 vácuo Initiatives ation SUB 42-22 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- 02 capacetes para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 26 27 motocicleta. Initiatives SUB 42-25 / Aquisição de Component 1: Sustainable pneus especializado para Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled andar em lugares de difícil Quotations Envelope 29 16 16 Initiatives acesso e terras alagadas. SUB 142-9 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-05- 2018-05- 2018-06- 2018-05- 2018-07- 2018-06- duas baterias recarregáveis TF / 18765 and Adaptive Community Post Limited 63.07 Completed Quotations Envelope 30 25 08 25 23 25 para câmera fotográfica Initiatives SUB 42-27 / Aquisição de carrinho de mão - Tijolo de 8 furos - Cimento comum - Telha de cerâmica plan com Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-06- 2017-10- 2018-07- 2017-11- 2018-07- cumieira - Prego para TF / 18765 and Adaptive Community Post Limited 4,439.56 Completed Quotations Envelope 25 19 11 05 11 27 caibros (pacote de pregos Initiatives 17 X 21 mm) e demais materiais para construção de uma barracão de alvenaria. SUB 26-6 / CT26.6 Aquisição de equipamentos Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- de informatica como TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 20 18 computador, impressora e Initiatives ation suprimentos SUB 45-4 / CT45.4 Aquisicao de materiais Component 1: Sustainable eletricos hidraulicos e de Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled construcao para a construir Quotations Envelope 26 18 17 Initiatives a Unidade de Beneficiamento de Producao de Azeite de Coco Babacu SUB 45-5 / CT45.5 Component 1: Sustainable Aquisicao de materiais para Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled forro e telhado da Unidade Quotations Envelope 26 19 18 Initiatives de Beneficiamento SUB 45-25 / Fornecimento de Combustível para Component 1: Sustainable Request for Single Stage - One 2018-06- 2018-06- 2018-12- acompanhamento técnico TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 05 25 22 do Subprojeto (São João do Initiatives Arraial - PI) SUB 45-1 / CT45.1 Servico Component 1: Sustainable Pending de fornecimento de Request for Single Stage - One 2018-06- 2018-06- 2018-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement combustivel para Quotations Envelope 05 21 18 Initiatives ation acompanhamento tecnico do subprojeto em Teresina (PI) Page 5 SUB 142 -8 / Aquisição de Component 1: Sustainable carne bovina para Request for Single Stage - One 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- TF / 18765 and Adaptive Community Post Limited 2,141.41 Completed atividades: Oficina de Polpas Quotations Envelope 13 13 15 15 30 25 Initiatives e Festa do Milho. SUB 99-16 / Aquisição de Component 1: Sustainable Pending materiais hidráulicos para Request for Single Stage - One 2018-07- 2018-07- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement implementação de unidade Quotations Envelope 05 22 21 Initiatives ation produtiva. SUB 110-29 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-08- 2018-08- 2018-09- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 28 27 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-34 / Fornecimento de gêneros alimentícios para Component 1: Sustainable Request for Single Stage - One 2018-08- 2018-08- 2018-09- Cercamento da área crítica TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 24 para fins de regeneração Initiatives natural,manejo agroflorestal agroecológico de espécies nativas. BR-CAA-39551-GO-RFQ / Aquisição de notebook, celular, cartão de memória micro SD, estabilizar para Component 2: Capacity filmar com celular, tripé Request for Single Stage - One 2018-09- 2018-11- 2018-09- 2019-02- 2018-11- 2018-12- TF / 18765 Building and Institutional Post Limited 2,657.62 Completed para celular, microfone de Quotations Envelope 10 13 17 13 16 13 Strengthening lapela e mochila para notebook - a serem utilizados pela equipe de comunicação do CAA/DGM Brasil BR-CAA-39552-GO-RFQ / Aquisição de câmera digital profissional para fotografia Component 2: Capacity Request for Single Stage - One 2018-09- 2018-11- 2018-09- 2018-11- 2018-11- 2018-12- e filmagem, lente para TF / 18765 Building and Institutional Post Limited 1,112.15 Completed Quotations Envelope 07 12 12 12 11 12 câmera digital profissional, Strengthening cabo de transferência de dados para câmera digital. 125-15 / Aquisição de 01 Drone para fazer o Component 1: Sustainable Request for Single Stage - One 2018-09- 2018-10- 2018-09- 2018-10- 2018-11- 2018-11- diagnóstico ambiental e TF / 18765 and Adaptive Community Post Limited 2,569.18 Completed Quotations Envelope 09 08 19 23 18 22 territorial, com treinamento Initiatives para uso. Component 1: Sustainable SUB 28-12 / Aquisição de Request for Single Stage - One 2018-11- 2020-12- 2018-12- 2020-12- 2019-01- 2020-12- TF / 18765 and Adaptive Community Post Limited 3,999.58 Completed materiais para construção Quotations Envelope 22 01 15 23 14 23 Initiatives SUB 28-17 / Aquisição de Component 1: Sustainable mudas de banana e coco Request for Single Stage - One 2018-11- 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- TF / 18765 and Adaptive Community Post Limited 2,846.33 Completed para instalação de campos Quotations Envelope 17 26 12 11 11 10 Initiatives de frutíferas. SUB 100 - 12 / Aquisição Component 1: Sustainable Pending de gêneros alimentícios Request for Single Stage - One 2018-11- 2018-12- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para realização de Quotations Envelope 17 15 14 Initiatives ation atividades do projeto SUB 100 - 14 / Contratação Component 1: Sustainable Pending de serviços para confecção Request for Single Stage - One 2018-11- 2018-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de camisetas e bonés para o Quotations Envelope 17 10 08 Initiatives ation concurso de roça do Xingu. Component 1: Sustainable SUB 100 - 16 / Aquisição Request for Single Stage - One 2018-11- 2019-08- 2018-12- 2019-08- 2019-01- 2019-10- TF / 18765 and Adaptive Community Post Limited 2,287.09 Completed de motor de popa 25hp Quotations Envelope 17 14 10 27 09 01 Initiatives BR-CAA-39553-GO-RFQ / Component 1: Sustainable Aquisição de notebooks e Request for Single Stage - One 2018-11- 2018-11- 2019-01- 2018-11- 2019-04- 2018-12- TF / 18765 and Adaptive Community Post Limited 2,990.95 Completed computadores para equipe Quotations Envelope 17 30 25 30 25 31 Initiatives do projeto SUB 120-18 / Aquisição de um barco e um motor de Component 1: Sustainable Pending popa para transporte de Request for Single Stage - One 2018-11- 2018-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement comunitários - saída do Quotations Envelope 17 10 08 Initiatives ation Território Xingu a outras localidades. SUB 116-1 / 27725Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-12- 2017-08- 2018-12- 2017-09- 2019-01- materiais elétricos e TF / 18765 and Adaptive Community Post Limited 1,116.10 Completed Quotations Envelope 03 10 25 18 29 17 hidráulicos para Initiatives implantação das unidade de processamento e hortas SUB 116-2 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- materiais para implantação TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 03 24 08 de Hortas de Quintais Initiatives ation SUB 116-3 / CT116.3 Aquisição de materiais de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-11- construção para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 29 07 implantação de unidade de Initiatives processamento e hortas SUB 116-36 / Aquisição de materiais de construção Component 1: Sustainable Pending Request for Single Stage - One 2018-11- 2018-12- 2019-02- como: cimento, areia, brita TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 16 14 e tijolos para implantação Initiatives ation da unidade de beneficiamento. SUB 116-37 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-12- 2019-09- 2018-12- 2019-10- 2019-02- 2019-10- materiais de irrigação para TF / 18765 and Adaptive Community Post Limited 831.51 Completed Quotations Envelope 01 25 20 02 18 31 hortas Initiatives SUB 116-6-2 / Aquisição Component 1: Sustainable de bens para Implantação Request for Single Stage - One 2018-12- 2019-01- 2018-12- 2019-01- 2019-02- 2019-02- TF / 18765 and Adaptive Community Post Limited 2,804.87 Completed de Hortas de Quintais, como Quotations Envelope 01 04 20 26 18 25 Initiatives bombas e caixas d'águas. SUB 125-17 / Aquisição de Component 1: Sustainable ferramentas para Request for Single Stage - One 2018-12- 2019-11- 2018-12- 2019-11- 2019-02- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,108.38 Completed construção de cercas, para Quotations Envelope 01 23 20 29 18 04 Initiatives cercamento de duas nascentes. SUB 125-16 / Aquisição de Component 1: Sustainable adubos orgânicos e Request for Single Stage - One 2018-11- 2020-10- 2018-12- 2020-11- 2019-01- 2020-11- TF / 18765 and Adaptive Community Post Limited 1,044.39 Completed sementes para plantio e Quotations Envelope 25 29 14 17 13 25 Initiatives recuperação de áreas degradadas. SUB 71-8 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-12- 2020-07- 2018-12- 2020-07- 2019-02- 2020-08- embalagens para produtos TF / 18765 and Adaptive Community Post Limited 2,076.23 Completed Quotations Envelope 01 20 20 23 18 06 beneficiados Initiatives SUB 108-9 / Aquisição de gêneros alimentícios para: Component 1: Sustainable Pending Capacitação em boas Request for Single Stage - One 2018-12- 2018-12- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement prátcas para produção de Quotations Envelope 01 20 19 Initiatives ation alimentos e capacitação em gestão da unidade de beneficiamento. SUB 108-10 / Aquisição de equipamentos para Component 1: Sustainable Pending estruturação da unidade de Request for Single Stage - One 2018-12- 2018-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement beneficiamento - Quotations Envelope 01 22 20 Initiatives ation liquidificador, fogão e forno industrial. SUB 108-11 / Aquisição de Component 1: Sustainable equipamentos para cozinha: Request for Single Stage - One 2018-12- 2020-06- 2018-12- 2020-06- 2019-02- TF / 18765 and Adaptive Community Post Limited 1,343.66 Signed batedeira, amassadeira e Quotations Envelope 01 25 26 25 24 Initiatives modeladora de pães. SUB 108-19 / Aquisição de cuba (tanque) de inox, pia Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-01- com cubas de inox para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 26 25 estruturação da unidade Initiatives ation multiuso. SUB 108-20 / Aquisição de mesa de inox e facas de Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-01- inox, prateleira industrial TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 26 25 para estruturação da Initiatives ation unidade multiuso SUB 108-23 / Aquisição de Component 1: Sustainable Under Request for Single Stage - One 2018-12- 2020-06- 2018-12- 2019-01- 2 freezers para estruturação TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 24 26 25 da unidade multi-uso Initiatives ation Component 1: Sustainable SUB 108-24 / Aquisição de Request for Single Stage - One 2018-12- 2019-05- 2018-12- 2019-06- 2019-01- 2019-06- TF / 18765 and Adaptive Community Post Limited 1,012.55 Completed engenho elétrico Quotations Envelope 01 02 26 07 25 28 Initiatives Component 1: Sustainable SUB 108-25 / Aquisição de Request for Single Stage - One 2018-12- 2019-04- 2018-12- 2019-04- 2019-01- 2019-05- TF / 18765 and Adaptive Community Post Limited 720.56 Completed notebook e impressora Quotations Envelope 01 08 26 12 25 29 Initiatives SUB 25-6 / CQ25.6 Aquisição de ferramentas e Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-09- 2018-07- materiais como botas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 04 26 23 chapéu arames ferro aço Initiatives ation cavadeira enxadas entre outros SUB 127-35 / Aquisição de gêneros para construtores Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-02- tradicionais e para evento TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 20 18 de inauguração do centro Initiatives ation de revitalização. SUB 127-36 / Aquisição de conjuntos (cama + box) - 2 Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-02- de casal e 8 de solteiro para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 20 18 estruturação do Centro de Initiatives ation Revitalização SUB 127-41 / Aquisição de artigos para estruturação da hospedaria do Centro de Revitalização da cultura e Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-02- visitação (lençóis de casal e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 20 18 solteiro, travesseiros, Initiatives ation cobertores de casal e solteiro, toalhas, fronhas, forro de mesa) SUB 75-5 / Aquisição de ferramentas básicas para Component 1: Sustainable Request for Single Stage - One 2018-12- 2019-07- 2018-12- 2019-08- 2019-01- 2019-08- construção do Projeto de TF / 18765 and Adaptive Community Post Limited 2,324.94 Completed Quotations Envelope 01 15 20 02 19 22 Turismo Sustentável, dos Initiatives Festejos Kalungas. SUB 75-6 / Aquisição de Ferramentas elétricas e de Component 1: Sustainable Alvenaria para construção Request for Single Stage - One 2018-12- 2020-01- 2018-12- 2020-01- 2019-01- 2020-07- TF / 18765 and Adaptive Community Post Limited 399.11 Completed do Projeto de Turismo Quotations Envelope 01 27 20 27 19 03 Initiatives Sustentável, para os festejos Kalungas. Component 1: Sustainable SUB 75-7 / Aquisição de Request for Single Stage - One 2018-12- 2019-07- 2018-12- 2019-08- 2019-01- 2019-08- TF / 18765 and Adaptive Community Post Limited 1,701.52 Completed materiais de irrigação Quotations Envelope 01 08 20 05 19 22 Initiatives SUB 75-8 / Aquisição de materiais de construção, Component 1: Sustainable Request for Single Stage - One 2018-12- 2019-06- 2018-12- 2019-06- 2019-01- 2019-07- para construção da sede do TF / 18765 and Adaptive Community Post Limited 8,865.62 Completed Quotations Envelope 01 11 20 18 19 01 Projeto de Turismo Initiatives Sustentável, para os Festejos Kalungas. SUB 75-9 / Aquisição de Component 1: Sustainable Pending materiais para construção Request for Single Stage - One 2018-12- 2018-12- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de lavanderia do Centro de Quotations Envelope 01 20 19 Initiatives ation Turismo Sustentável. SUB 75-10 / Aquisição de materiais hidráulicos para Component 1: Sustainable Request for Single Stage - One 2018-12- 2019-07- 2018-12- 2019-08- 2019-01- 2019-08- construção de banheiros, do TF / 18765 and Adaptive Community Post Limited 1,131.26 Completed Quotations Envelope 01 17 20 05 19 15 Centro de Turismo Initiatives Sustentável para os festejos Kalungas. AI3 - 5 / Aquisição de gêneros alimentícios para preparar refeição para as Component 1: Sustainable Community 2018-03- 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- mulheres quebradeiras de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 20 03 10 14 21 21 coco babaçu evento VIII Initiatives Development Encontrão das Quebradeiras de Coco Babaçu. BR-CAA-39554-GO-RFQ / Aquisição de notebooks para membros do Comitê Component 3: Project Request for Single Stage - One 2019-01- 2019-03- 2019-02- 2019-04- 2019-04- 2019-04- Gestor Nacional, para TF / 18765 Management, Monitoring Post Limited 6,834.14 Completed Quotations Envelope 24 28 14 17 15 25 realização de and Evaluation acompanhamento e monitoramento das atividades do projeto. SUB 110-2 / Aquisição de materiais rolos arame liso para cercamento e restauração de área com Component 1: Sustainable erosão, Construção de Request for Single Stage - One 2017-11- 2019-02- 2018-01- 2019-04- 2018-02- 2019-04- TF / 18765 and Adaptive Community Post Limited 2,899.41 Completed viveiro e sala de Quotations Envelope 25 28 19 16 28 17 Initiatives armazenamento de sementes - Grampo, Arame liso ovalado de aço zincado, Arame galvanizado, Tela de arame e outros necessários SUB 110-14 / Aquisição de Component 1: Sustainable postes de eucalipto tratado, Request for Single Stage - One 2017-08- 2019-03- 2017-08- 2019-03- 2017-09- 2019-04- TF / 18765 and Adaptive Community Post Limited 1,545.68 Completed Postes , Postes, Postes Quotations Envelope 02 01 25 15 29 15 Initiatives finos para paliçadas. SUB 110-35 / Fornecimento de gêneros Component 1: Sustainable alimentícios refeições para Request for Single Stage - One 2018-12- 2018-12- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled os trabalhadores que vão Quotations Envelope 05 26 25 Initiatives perfurar os buracos para fazer o cercamento das nascentes. SUB 110-30 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-09- 2018-09- 2018-10- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 25 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-31 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-10- 2018-10- 2018-11- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 05 26 25 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-33 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-11- 2018-11- 2018-12- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 25 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-32 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-11- 2018-11- 2018-12- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 25 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-27 / Gêneros alimentícios para Component 1: Sustainable preparação de refeições Request for Single Stage - One 2017-08- 2019-02- 2017-08- 2019-02- 2018-01- 2019-03- TF / 18765 and Adaptive Community Post Limited 415.87 Completed para os participantes das Quotations Envelope 03 21 28 27 25 27 Initiatives reuniões/atividades do projeto. SUB 123-4 / 123.4 Contratação serviço fornecimento de Component 1: Sustainable combustível para: Gasolina Request for Single Stage - One 2018-04- 2019-03- 2018-05- 2019-04- 2019-12- 2019-07- TF / 18765 and Adaptive Community Post Limited 1,000.35 Completed para expedição de coleta e Quotations Envelope 15 07 08 03 29 01 Initiatives transporte de artesanato. Óleo 2tp para expedição de coleta e transporte de artesanato SUB 123 -6 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-03- 2019-03- 2018-04- 2019-03- 2018-06- 2019-05- 400 camisetas brancas para TF / 18765 and Adaptive Community Post Limited 1,598.19 Completed Quotations Envelope 28 11 10 19 11 29 uso na Oficina de Serigrafia. Initiatives SUB 123 -8 / Aquisição de gêneros alimentícios para Component 1: Sustainable Oficinas, Treinamentos, Request for Single Stage - One 2018-03- 2018-04- 2019-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Assembleias e demais Quotations Envelope 23 05 27 Initiatives atividades envolvendo a comunidade. SUB 123 -11 / Aquisição de materiais para produção de Component 1: Sustainable artesanato (miçangas, linha Request for Single Stage - One 2018-03- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled encerada, linha de nylon, Quotations Envelope 28 10 11 Initiatives agulha, feixos e ganchos, etc...) SUB 268 SC 01 / Aquisição Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-10- 2019-03- 2019-11- 2019-05- de ferramentas para TF / 18765 and Adaptive Community Post Limited 1,620.48 Signed Quotations Envelope 19 30 09 27 09 produção de artesanato em Initiatives madeira SUB 268 SC 02 / Aquisição de combustível (óleo diesel Component 1: Sustainable Pending Request for Single Stage - One 2019-02- 2019-03- 2020-01- e gasolina) para atividade TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 09 04 Aquisição de insumos para Initiatives ation produção dos artesanatos. Page 6 SUB 268 SC 04 / Aquisição de combustível (óleo diesel Component 1: Sustainable Pending e gasolina) para atividade Request for Single Stage - One 2019-02- 2019-03- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Realizar atividades de Quotations Envelope 19 09 04 Initiatives ation vigilância territorial da TI Menkü SUB 173 SC 003 / Aquisição de material de Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-08- 2019-03- 2019-09- 2019-04- 2019-10- construção para obra de TF / 18765 and Adaptive Community Post Limited 7,908.73 Completed Quotations Envelope 19 20 09 16 09 07 estruturação da unidade de Initiatives beneficiamento comunitária SUB 173 SC 006 / Component 1: Sustainable Pending Aquisição de material Request for Single Stage - One 2019-02- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement hidráulico para construção Quotations Envelope 19 09 09 Initiatives ation da unidade de beneficiamento SUB 173 SC 012 / Component 1: Sustainable Aquisição de despolpadeira Request for Single Stage - One 2019-05- 2019-05- 2019-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e fogão industrial para Quotations Envelope 09 27 27 Initiatives estruturação da unidade de beneficiamento. SUB 263 SC 001 / Component 1: Sustainable Aquisição de material de Request for Single Stage - One 2019-02- 2019-08- 2019-03- 2019-08- 2019-04- 2019-10- TF / 18765 and Adaptive Community Post Limited 7,378.24 Completed construção e acabamentos Quotations Envelope 19 08 09 16 09 01 Initiatives para reforma da casa de artesanato. SUB 250 SC 001 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-03- 2019-03- 2019-03- 2019-06- 2019-04- Aquisição de dois TF / 18765 and Adaptive Community Post Limited 1,027.13 Completed Quotations Envelope 19 07 09 07 08 06 notebooks para Initiatives estruturação da cooperativa SUB 45-3 / Aquisição de materiais de construção sendo areias, britas, tijolos, Component 1: Sustainable Request for Single Stage - One 2017-06- 2019-09- 2017-07- 2019-10- 2017-08- 2019-10- cimento, pedras e cal para TF / 18765 and Adaptive Community Post Limited 7,404.37 Completed Quotations Envelope 26 27 20 10 19 22 construir Unidade de Initiatives Beneficiamento de Produção de Azeite de Coco Babaçu. SUB 45-16 / Componentes de cozinha industrial: Luvas, Bacia de Alumínio, Colher grande e rasa de alumínio, Component 1: Sustainable Pending concha de alumínio grande, Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement bacia de alumínio grande, Quotations Envelope 28 19 18 Initiatives ation Colher de Pau grande, Caldeirão para cozimento inox, Tacho de alumínio de 100L e de 50L. SUB 45-24 / CT45.24 Aquisicao de generos alimenticios das comunidades para os Component 1: Sustainable treinamentos de Oficina de 2017-06- 2017-07- 2017-07- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled Gestao Organizacional 30 05 17 09 Initiatives Oficina de Planejamento Participativo Intercambio Curso de Seguranca do Trabalho Saude da Mulher dentre outros SUB 45-18 / CT45.18 Component 1: Sustainable Pending Aquisicao de mesa de Request for Single Stage - One 2017-07- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement granizo para manipulacao e Quotations Envelope 01 24 23 Initiatives ation envase do azeite SUB 45-20 / CT45.20 Component 1: Sustainable Pending Aquisicao de embalagens Request for Single Stage - One 2017-07- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement plasticas rotulos funis Quotations Envelope 01 20 19 Initiatives ation bacias e peneiras SUB 55-4 / CT55.4 Component 1: Sustainable Aquisicao de barraca feira Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para exposicao e venda dos Quotations Envelope 28 27 26 Initiatives produtos dos comunitarios SUB 179 SC 003 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-03- 2019-05- Aquisição de Materiais TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 19 09 09 Hidráulicos para construção Initiatives de obras SUB 211 SC 002 / Aquisição de materiais de Component 1: Sustainable Under Request for Single Stage - One 2019-02- 2020-08- 2019-03- 2019-04- construção/elétricos para TF / 18765 and Adaptive Community Post Limited 1,933.72 Implement Quotations Envelope 23 04 13 13 construção da Casa de Initiatives ation Cultura: SUB 211 SC 001 / Aquisição de: notebook, modem para replicação, Component 1: Sustainable datashow, lâmpada para Request for Single Stage - One 2019-02- 2019-10- 2019-03- 2019-10- 2019-04- 2019-10- TF / 18765 and Adaptive Community Post Limited 824.80 Completed datashow, impressora Quotations Envelope 23 16 13 16 13 30 Initiatives multifuncional, repetidor de sinal de internet para estruturação da Associação dos Artesões e extrativistas SUB 218 SC 003 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-04- 2019-03- 2019-04- 2019-04- 2019-08- Aquisição de linha para TF / 18765 and Adaptive Community Post Limited 906.06 Completed Quotations Envelope 19 16 09 26 09 30 bordado, diversas cores Initiatives SUB 218 SC 006 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-09- Aquisição de algodão TF / 18765 and Adaptive Community Post Limited 4,564.02 Completed Quotations Envelope 19 28 09 03 09 16 orgânica cardado cru Initiatives SUB 71-5 / CT71.5 Component 1: Sustainable Aquisicao de generos Request for Single Stage - One 2017-07- 2017-08- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled alimenticios para os Quotations Envelope 18 15 06 Initiatives encontros coletivos do projeto SUB 61-1 / CQ61.1 Aquisição de duas antenas Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-09- distribuidora de sinal antena TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 15 07 26 receptora de sinal e Initiatives duzentos metros de cabo de transmissão de dados Component 1: Sustainable SUB 61-2 / CQ61.2 Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Aquisicao de mesa inox Quotations Envelope 17 07 16 Initiatives SUB 61-3 / CQ61.3 Component 1: Sustainable Aquisição de quatro Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled armários para resfriamento Quotations Envelope 19 14 23 Initiatives de produtos com vinte bandejas cada SUB 93- 4 / Aquisiçao de Component 1: Sustainable Pending generos alimenticios para Request for Single Stage - One 2019-03- 2019-03- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement participantes durante Quotations Envelope 05 20 19 Initiatives ation implementaçao da horta SUB 61-9 / CQ61.9 Aquisição de quatro palletts Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-09- de plastico utilizado na TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 31 21 20 unidade de beneficiamento Initiatives e de trinta caixas plasticas brancas SUB 61-11 / CQ61.11 Component 1: Sustainable Request for Single Stage - One 2018-01- 2018-02- 2018-03- Aquisição de mil sacos de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 24 16 18 rafia Initiatives SUB 61-13 / CQ61.13 Aquisição de materiais de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- escritório e didáticos para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 25 24 uma capacitação de boas Initiatives praticas SUB 61-15 / CQ61.15 Component 1: Sustainable Aquisição de um programa Request for Single Stage - One 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de edição de vídeo Quotations Envelope 09 04 04 Initiatives compatível sony vegas SUB 93- 9 / Aquisição de gêneros alimentícios para Component 1: Sustainable Pending Request for Single Stage - One 2019-03- 2019-03- 2019-05- participantes durante TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 05 22 01 Manutenção do viveiro e Initiatives ation preparo de mudas SUB 93- 8 / Aquisição de gêneros alimentícios para Component 1: Sustainable Pending participantes durante Request for Single Stage - One 2019-03- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Expedição para coleta de Quotations Envelope 05 22 21 Initiatives ation sementes em sistema de mutirão SUB 113- 22 / Aquisição de Component 1: Sustainable insumos para povoamente Request for Single Stage - One 2019-03- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de coméia e implantação de Quotations Envelope 10 21 20 Initiatives apiário SUB 113- 24 / Aquisiçao de 2 kits para instalaçao de viveiros (Telas de Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-05- sombreamento, Arames, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 14 25 24 pregos, catracas, Initiatives mangueiras, gotejadores, microaspersores, fios eletricos, conexoes etc.) SUB 250-3 / Aquisição de 1200, Garrafas de vidros Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-09- 2019-03- 2019-09- 2019-05- 2019-10- 500ml, 700 Garrafas de TF / 18765 and Adaptive Community Post Limited 911.13 Completed Quotations Envelope 21 03 18 10 16 11 vidros 250ml + Tampas + Initiatives Lacres, para Azeite de Babaçu. SUB 250-4 / Aquisição de Component 1: Sustainable Pending 30 kits de vestuário de uso Request for Single Stage - One 2019-02- 2019-03- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement feminino - (Kit oculo, Quotations Envelope 23 18 16 Initiatives ation sapato, calça, aventa, touca). SUB 0- 1 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-10- 2019-03- 2019-10- 2019-04- 2019-12- mudas frutíferas e nativas TF / 18765 and Adaptive Community Post Limited 2,918.25 Completed Quotations Envelope 18 10 26 31 25 05 para replantio Initiatives SUB 0- 2 / Aquisição de kit Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-09- 2019-03- 2019-10- 2019-04- 2019-10- horta e materiais para TF / 18765 and Adaptive Community Post Limited 223.43 Completed Quotations Envelope 18 30 26 10 25 29 viveiro Initiatives SUB 26-9 / CT26.9 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-10- Aquisicao de sementes e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 12 07 06 mudas Initiatives SUB 170- 1 / Aquisiçao de notebook, Projetor Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-03- 2019-03- 2019-05- 2019-04- multimidia - data show, TF / 18765 and Adaptive Community Post Limited 2,212.81 Completed Quotations Envelope 18 06 26 06 25 06 Camera fotografica , Tela Initiatives com suporte para projeçao de data show SUB 210- 3 / Aquisição de Component 1: Sustainable equipamentos: computador, Request for Single Stage - One 2019-03- 2019-03- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled impressora, projetor e Quotations Envelope 16 24 23 Initiatives balança eletrônica SUB 210- 4 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-09- 2019-03- 2019-09- 2019-05- 2019-10- materiais para construçao TF / 18765 and Adaptive Community Post Limited 1,624.01 Completed Quotations Envelope 15 20 23 30 22 04 de viveiro Initiatives SUB 210- 5 / Aquisiçao de materiais para estruturaçao do viveiro: Caixa D'agua 400 L, Boia de Caixa D'agua, Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-04- Micro aspersor invertido, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 16 24 23 Bomba de agua submersa Initiatives completa, mangueira de Polietileno 3/4'', mangueira de Polietileno 1/2'' rolo de 50m, Pulverizadores Component 1: Sustainable SUB 30-36 / Aquisição de Request for Single Stage - One 2019-03- 2019-04- 2019-04- 2019-05- 2019-07- 2019-05- TF / 18765 and Adaptive Community Post Limited 3,074.71 Completed uma motocicleta Quotations Envelope 15 24 18 20 17 29 Initiatives SUB 105-9 / CQ105.9 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-07- 2017-09- Aquisição de duas mesas de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 13 31 04 escritório. Initiatives SUB 124 - 8 / Aquisição de touca protetora individual, aquisição de luvas de Component 1: Sustainable Community borracha,aquisição de 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled perneiras de proteção 29 12 19 22 01 30 Initiatives Development individual, aquisição de luvas de raspas, aquisição de botas para trabalho no campo. Component 1: Sustainable SUB 113-15 / Aquisição de Request for Single Stage - One 2017-09- 2019-03- 2017-10- 2019-04- 2018-01- 2019-04- TF / 18765 and Adaptive Community Post Limited 3,604.08 Completed 2 motos Quotations Envelope 29 29 30 15 30 26 Initiatives SUB 113- 23 / Caçamba Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-04- 2019-04- 2019-04- 2019-07- 2019-05- rural : semirreboques, para TF / 18765 and Adaptive Community Post Limited 1,732.44 Completed Quotations Envelope 24 12 14 29 13 10 transporte de mercadorias: Initiatives SUB 179 SC 002 / Veículo utilitário tipo camionete Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-05- 2019-03- 2019-06- 2019-04- 2019-07- pick -up, Motor: 1.4, TF / 18765 and Adaptive Community Post Limited 11,127.64 Completed Quotations Envelope 19 21 09 03 09 05 Combustível: Álcool e Initiatives Gasolina, Motor: No mínimo 120 cavalos SUB 210- 2 / Aquisiçao de veículo utilitário tipo camionete pick -up, Motor: Component 1: Sustainable 1.4, Combustível: Álcool e Request for Single Stage - One 2019-03- 2019-06- 2019-03- 2019-06- 2019-07- 2019-08- TF / 18765 and Adaptive Community Post Limited 11,175.64 Completed Gasolina, Motor: No mínimo Quotations Envelope 15 03 23 19 21 05 Initiatives 120 cavalos, Ano/modelo: 2015 a 2018, Portas: mínimo 02 (portas). SUB 26-3 / CT26.3 Component 1: Sustainable Request for Single Stage - One 2017-06- 2017-07- 2017-10- Aquisição de itens para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 24 18 16 construção do viveiro de Initiatives mudas SUB 120-15 / Aquisição de gêneros alimentícios Component 1: Sustainable adquiridos direto da 2017-10- 2017-11- 2017-11- 2018-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled comunidade para realização 20 03 21 06 Initiatives do encontro anual dos coletores do tix SUB 120-8 / Aquisição de Component 1: Sustainable gêneros alimentícios, para Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- TF / 18765 and Adaptive Community Post Limited 2,921.87 Completed encontro anual dos Quotations Envelope 20 07 03 17 02 27 Initiatives coletores do TIX. BR-CAA-110409-GO-RFQ / Aquisição de Bolsa para transporte de câmera Component 2: Capacity Pending profissional e acessórios Request for Single Stage - One 2019-04- 2019-05- 2019-06- TF / 18765 Building and Institutional Post Limited 0.00 Implement (lentes, carregador, bateria Quotations Envelope 29 16 15 Strengthening ation e cartão de memória) para uso durante acompanhamento do projeto DGM e subprojetos Component 1: Sustainable SUB 250-2 / Aquisição de Request for Single Stage - One 2019-02- 2019-08- 2019-03- 2019-08- 2019-06- 2019-08- TF / 18765 and Adaptive Community Post Limited 1,944.07 Completed 05 Forrageiras. Quotations Envelope 21 07 18 07 17 30 Initiatives BR-CAA-110418-GO-RFQ / Aquisição de materiais Component 2: Capacity Pending didáticos para as Request for Single Stage - One 2019-04- 2019-05- 2019-06- TF / 18765 Building and Institutional Post Limited 0.00 Implement capacitações e eventos do Quotations Envelope 29 16 15 Strengthening ation plano de capacitações do DGM que serão realizadas em 2019 SUB 124 - 5 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- kits de material didáticos TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 22 05 14 16 23 25 para capacitação. Initiatives Development SUB 124 - 11 / Aquisição de 1 Droner e duas Component 1: Sustainable baterias, para fazer o Request for Single Stage - One 2019-05- 2019-10- 2019-05- 2019-11- 2019-07- 2019-11- TF / 18765 and Adaptive Community Post Limited 2,694.56 Completed mapeamento e o Quotations Envelope 10 28 26 01 25 26 Initiatives diagnóstico de cada trecho a ser recuperado na terra indígena Araribé. BR-CAA-110424-GO-RFQ / Aquisição de materiais Component 2: Capacity pedagógicos específicos Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- TF / 18765 Building and Institutional Post Limited 161.73 Completed para o curso de Quotations Envelope 29 03 16 10 15 10 Strengthening Agroindústria a ser realizado em Montes Claros/MG Component 1: Sustainable Pending SUB 250-7 / Aquisição de Request for Single Stage - One 2019-04- 2019-05- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement 03 Fornos para Torrefação Quotations Envelope 29 16 14 Initiatives ation Component 1: Sustainable SUB 250-8 / Aquisição de Request for Single Stage - One 2019-04- 2020-01- 2019-05- 2020-01- 2019-08- 2020-02- TF / 18765 and Adaptive Community Post Limited 1,073.83 Completed 12 panelas de alumínio Quotations Envelope 29 16 16 29 14 28 Initiatives SUB 195 - 1 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-04- 2020-09- 2019-05- 2020-10- 2019-08- 2020-12- veículo tipo hatch, 1.0, TF / 18765 and Adaptive Community Post Limited 8,293.61 Completed Quotations Envelope 30 23 31 08 29 22 0KM. Initiatives BR-CAA-110415-GO-RFQ / Aquisição de 400 pen- Component 2: Capacity Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- 2019-05- drives para utilização dos TF / 18765 Building and Institutional Post Limited 2,884.94 Completed Quotations Envelope 29 08 16 10 15 13 participantes nos cursos de Strengthening capacitação do DGM SUB 218 SC 005 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-05- 2019-03- 2019-06- 2019-04- 2019-08- Aquisição de tecido de TF / 18765 and Adaptive Community Post Limited 1,957.69 Completed Quotations Envelope 19 20 09 03 09 16 algodão Initiatives Page 7 BR-CAA-110433-GO-RFQ / Aquisição de itens periféricos e acessórios de Component 3: Project Request for Single Stage - One 2019-06- 2019-06- 2019-06- 2019-06- 2019-09- informática, como mouses, TF / 18765 Management, Monitoring Post Limited 787.65 Signed Quotations Envelope 03 25 13 25 11 teclados, suportes de and Evaluation notebook componentes de computores - SSD e adpatadores SUB 56-5 / CT56.5 Component 1: Sustainable Aquisição de materiais para Request for Single Stage - One 2017-08- 2019-07- 2017-09- 2019-07- 2018-03- 2019-10- TF / 18765 and Adaptive Community Post Limited 5,542.35 Completed cercamento de nascente: Quotations Envelope 28 01 20 25 19 17 Initiatives arames (bola 500 metros). SUB 56-6 / CT56.6 Component 1: Sustainable Request for Single Stage - One 2017-07- 2019-07- 2017-08- 2019-07- 2019-06- 2019-09- Aquisição de postes de TF / 18765 and Adaptive Community Post Limited 7,098.60 Completed Quotations Envelope 22 01 14 25 15 06 eucalipto tratado para Initiatives cercamento de nascente SUB 218 - SC 007.2019 / Component 1: Sustainable Pending Contratação de serviços Request for Single Stage - One 2019-06- 2019-08- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para produção de folders, Quotations Envelope 16 11 08 Initiatives ation banners personalizadas. SUB 2120-1 / Aquisição de materiais de construção, Component 1: Sustainable Pending Request for Single Stage - One 2019-06- 2019-07- 2019-08- elétrico e hidráulico para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 24 17 17 construção da cozinha Initiatives ation comunitária SUB 201-1 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-07- 2019-07- 2019-07- 2019-10- 2019-11- 2019-10- um veículo, tipo pickup para TF / 18765 and Adaptive Community Post Limited 11,626.39 Completed Quotations Envelope 03 30 21 02 11 22 dois passageiros Initiatives SUB 201-2 / Gêneros alimentícios para Realizar o resgate e o fortalecimento da festa pon hy pry (bola Component 1: Sustainable Request for Single Stage - One 2019-06- 2019-09- 2019-07- 2019-10- 2019-09- 2019-10- confeccionada com palha de TF / 18765 and Adaptive Community Post Limited 3,953.37 Completed Quotations Envelope 28 30 19 07 20 11 milho); Gêneros alimentícios Initiatives para Festa do mentowaji (corrida de tora, flechas, cantorias a noite no pátio). SUB 241-4 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-08- bomba d'agua hidráulica e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Proposals Envelope 17 25 05 08 13 13 mangueira 32mm Initiatives SUB 56 - 20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-07- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- materiais de construção TF / 18765 and Adaptive Community Post Limited 1,101.26 Completed Quotations Envelope 02 10 26 17 27 22 para reforma da associação. Initiatives SUB 241-5 / Aquisição de matrizes de porcos caipira Component 1: Sustainable Pending Request for Single Stage - One 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-08- para implementação de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Proposals Envelope 17 25 05 09 13 13 sistema de produção de Initiatives ation porcos caipiras SUB 2120-3 / Aquisição de materiais para estruturação Component 1: Sustainable Pending Request for Single Stage - One 2019-06- 2019-08- 2019-08- da cozinha comunitária (Pias TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 24 04 18 inox, mesas inox, prateleira Initiatives ation de aço, armário de aço) SUB 211 SC 008 / Aquisição de móveis Component 1: Sustainable Pending (camas, estantes/armários, Request for Single Stage - One 2019-07- 2019-07- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement expositório com portas de Quotations Envelope 09 26 15 Initiatives ation vidro, jogo de sofá e cadeiras etc. SUB 211 SC 009 / Component 1: Sustainable Pending Aquisição de geladeira, Request for Single Stage - One 2019-07- 2019-07- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement freezers, máquina de lavar, Quotations Envelope 10 27 16 Initiatives ation forno micro-ondas etc. SUB 224 SC 002 / Component 1: Sustainable Request for Single Stage - One 2019-06- 2019-08- 2019-07- 2019-08- 2019-10- 2019-08- Aquisição de 01 TF / 18765 and Adaptive Community Post Limited 3,593.73 Completed Quotations Envelope 26 01 19 09 18 20 motocicletas para atividades Initiatives de vigilância SUB 224 SC 001 / Aquisição de um veículo utilitário tipo camionete Component 1: Sustainable pick -up, Motor: 1.4, Request for Single Stage - One 2019-06- 2019-07- 2019-07- 2019-07- 2019-10- 2019-09- TF / 18765 and Adaptive Community Post Limited 14,254.00 Completed Combustível: Álcool e Quotations Envelope 26 26 19 30 18 26 Initiatives Gasolina, Motor: No mínimo 120 cavalos, Ano/modelo: 2015 a 2018, Portas: mínimo 02 (portas) Component 1: Sustainable Pending SUB 75-12 / Aquisição de Request for Single Stage - One 2019-07- 2019-08- 2019-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement madeiras Quotations Envelope 30 10 12 Initiatives ation Component 1: Sustainable Pending SUB 28 - 2 / Aquisição de Request for Single Stage - One 2019-07- 2019-09- 2019-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement gêneros alimentícios Quotations Envelope 28 13 23 Initiatives ation SUB 169 -1 / Aquisição de Component 1: Sustainable Under Request for Single Stage - One 2019-07- 2019-08- 2019-09- 2020-03- equipamentos de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 29 24 22 Informática Initiatives ation SUB 61-21 / Aquisição de móveis para escritório: 01 arquivo para escritório com 04 gavetas R$ 600,00; 01 Component 1: Sustainable armário de escritório R$ Request for Single Stage - One 2019-08- 2019-08- 2019-09- 2019-09- 2019-11- 2019-10- TF / 18765 and Adaptive Community Post Limited 4,276.50 Completed 300,00; 01 armário balcão Quotations Envelope 22 01 12 09 03 18 Initiatives R$ 200,00; 20 cadeiras R$ 6.000,00; 01 cadeira de escritório R$ 300,00; 01 estrutura com 03 cadeiras R$ 500,00; SUB 61-22 / Aquisição de mesa inox; Aquisição de quatro armários para resfriamento de produtos Component 1: Sustainable Request for Single Stage - One 2019-08- 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- com 20 bandejas cada; TF / 18765 and Adaptive Community Post Limited 3,057.93 Completed Quotations Envelope 22 24 12 14 14 07 Aquisição de um Forno Initiatives Turbo com 10 bandejas; Aquisição de 12 facas de inox; 02 armários crescimento com 20 bandejas. SUB 75- SC 009-2019 / Aquisição de 2 caixas d Component 1: Sustainable Request for Single Stage - One 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2019-09- água 5 mil litros para os TF / 18765 and Adaptive Community Post Limited 1,052.55 Completed Quotations Envelope 29 22 21 02 06 03 Festejos Kalungas - Initiatives Comunidade Vão de Almas SUB 123-SC 012-2019 / Component 1: Sustainable Aquisição de combustível e Request for Single Stage - One 2019-08- 2019-10- 2020-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled óleo 2T para atividades de Quotations Envelope 23 18 15 Initiatives Assembléia Geral SUB 123 -SC 007.2019 / Component 1: Sustainable Aquisição de combustível Request for Single Stage - One 2019-08- 2019-10- 2020-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para expedições de coleta Quotations Envelope 23 18 15 Initiatives de material SUB 169-SC 001/2019 / Component 1: Sustainable Aquisição de materiais de Request for Single Stage - One 2019-09- 2019-08- 2019-10- 2019-09- 2019-11- 2019-10- TF / 18765 and Adaptive Community Post Limited 1,786.04 Completed construção e materiais Quotations Envelope 17 30 05 06 05 17 Initiatives elétricos e hidráulicos SUB 61-6 / CQ61.6 Component 1: Sustainable Request for Single Stage - One 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- 2020-01- Aquisição de uma TF / 18765 and Adaptive Community Post Limited 11,505.56 Completed Quotations Envelope 19 12 10 15 21 28 despolpadeira Initiatives SUB 263 SC 002 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-09- 2019-03- 2019-09- 2019-07- 2019-10- Aquisição de alimentação TF / 18765 and Adaptive Community Post Limited 2,050.52 Completed Quotations Envelope 19 13 09 30 08 01 durante a reforma da casa Initiatives do artesanato SUB 166 SC 015 / Aquisição de materiais de Component 1: Sustainable Pending construção, elétrico e Request for Single Stage - One 2019-09- 2019-09- 2019-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement hidráulicos para obra de Quotations Envelope 09 22 22 Initiatives ation cozinha para processamento de frutos do cerrado. SUB 166 SC 018 / Component 1: Sustainable Pending Aquisição de materiais Request for Single Stage - One 2019-10- 2019-10- 2019-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement elétricos para obra da Quotations Envelope 08 25 27 Initiatives ation cozinha para processamento de frutos SUB 75 - 13 / Aquisição de materiais de construção Component 1: Sustainable Request for Single Stage - One 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- para continuação da obra TF / 18765 and Adaptive Community Post Limited 1,765.45 Completed Quotations Envelope 04 07 20 11 19 29 para estruturação do espaço Initiatives comunitário. SUB 169 -2 / Aquisição de móveis e eletrodomésticos Component 1: Sustainable para equipar o centro Request for Single Stage - One 2019-10- 2019-10- 2019-11- 2019-10- 2020-05- 2019-11- TF / 18765 and Adaptive Community Post Limited 1,229.19 Completed comunitário: geladeira 300l; Quotations Envelope 01 07 26 09 24 11 Initiatives ventiladores; Cadeiras de escritorio; Bebedouro e mesas Component 1: Sustainable SUB 170 - 6 / aquisição de Request for Single Stage - One 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- TF / 18765 and Adaptive Community Post Limited 2,066.10 Completed ferramentas agrícolas Quotations Envelope 09 08 14 16 14 12 Initiatives SUB 85 -13 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- caixa de papel A4, Sacos TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 10 24 02 05 10 13 de papel kraft 1/2 kg 1000 Initiatives Development un. Component 1: Sustainable Community SUB 85 -15 / Aquisição de 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-10- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled gêneros alimentícios. 12 26 05 06 12 07 Initiatives Development SUB 85-15 / Materiais de Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-11- 2019-12- construção e elétrico para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 27 27 construção do viveiro Initiatives ation SUB 16-8 / CQ16-8 Aquisição de ferramentas e Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-10- materiais elétricos TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 23 23 hidráulicos e para Initiatives implantação produção agroecológica e horta. SUB 16-23 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-10- 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- caixa d'água de 20.000 TF / 18765 and Adaptive Community Post Limited 1,365.96 Completed Quotations Envelope 13 27 01 10 01 02 litros para instalação no Initiatives viveiro SUB 3-1 / aquisição de Component 1: Sustainable combustíveis para ser Request for Single Stage - One 2017-08- 2017-09- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled utilizado para o plantio de Quotations Envelope 25 29 20 Initiatives mudas e coletas de sementes. SUB 3-2 / Aquisição de kit Component 1: Sustainable Request for Single Stage - One 2018-07- 2018-08- 2018-10- de material de construção TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 23 28 29 (areia, cimento, pedra, Initiatives telha, etc.) SUB 98-18 / Aquisição de gêneros alimentícios para Component 1: Sustainable Request for Single Stage - One 2018-12- 2018-12- 2019-02- mutirão durante a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 24 22 construção da casa de Initiatives cultura e cercamento das nascentes. Component 1: Sustainable Community SUB 98 -6 / Aquisição de 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled móveis para escritório. 13 27 03 05 15 16 Initiatives Development Component 1: Sustainable SUB 55-1 / CT55.1 Request for Single Stage - One 2019-10- 2019-11- 2019-11- 2019-12- 2020-02- TF / 18765 and Adaptive Community Post Limited 20,776.86 Signed Aquisicao de Container Quotations Envelope 08 21 01 10 29 Initiatives SUB 127-26 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2017-12- 2018-01- arreios e demais acessorios TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 18 07 para montaria Initiatives SUB 127-37 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-12- 2018-12- 2019-02- 3 equinos para passeios TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 20 18 turísticos Initiatives SUB 30 - 14 / Aquisição de balaios para transporte de sementes, tesouras para sebes, tesouras de podar e Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- ferramentas semelhantes, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 13 30 30 manipuladas com as duas Initiatives mãos, adubo químico 4-14- 8 e regador de água para plantas . SUB 30 - 16 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-11- areia lavada do rio, calhaus, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 17 17 cascalho, pedras britadas. Initiatives SUB 30 - 17 / Aquisição de móveis de escritório sendo: Component 1: Sustainable mesa de reunião com 4 Request for Single Stage - One 2017-10- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled cadeiras, mesa e cadeira de Quotations Envelope 16 01 01 Initiatives escritório, armário para escritório, armário em aço. SUB 30 - 18 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- bebedouro refrigerador TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 02 18 18 industrial 50 l com filtro Initiatives SUB 30 - 19 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-11- 02 (dois) Botijões de gás 13 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 17 17 kg Initiatives Component 1: Sustainable SUB 30 - 23 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled 01 (uma) câmara digital. Quotations Envelope 29 16 16 Initiatives Component 1: Sustainable SUB 30 - 25 / Aquisições Request for Single Stage - One 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de Telhas de eternit. Quotations Envelope 02 18 18 Initiatives SUB 30 - 28 / Aquisição de kit de antenas receptoras Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- com baterias, placas TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 21 21 solares,cabos e demais Initiatives equipamentos para comunicação via internet. SUB 30 - 29 / Aquisição de kit de equipamentos de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- segurança contendo botas, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 12 30 20 luvas, óculos, chapéu de Initiatives palha e avental. Component 1: Sustainable SUB 30 - 31 / Aquisição Request for Single Stage - One 2017-11- 2018-12- 2017-11- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled saco plástico preto Quotations Envelope 03 12 20 11 Initiatives Component 1: Sustainable SUB 30 -22 / Aquisição de Request for Single Stage - One 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled cimentos e argamassas. Quotations Envelope 02 19 20 Initiatives SUB 98 -7 / Aquisição de equipamentos de Component 1: Sustainable informática, sendo: 01 Request for Single Stage - One 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,087.58 Signed impressoras, 01 notebooks, Quotations Envelope 23 17 02 19 17 Initiatives 01 Tela com suporte para projeção de data show, 01 Projetor multimidia. SUB 210-3 NOVA / Aquisicao de equipamentos: Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-03- 2019-03- 2019-05- 2019-03- computador, impressora, TF / 18765 and Adaptive Community Post Limited 1,278.43 Completed Quotations Envelope 03 13 14 13 13 27 projetor - para estruturacao Initiatives da associacao. SUB 139-2 / Aquisição de equipamentos para estruturação da cozinha comunitária: um fogão Component 1: Sustainable Pending Request for Single Stage - One 2019-10- 2019-11- 2020-01- industrial a gás; forno à gás; TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 09 08 liquidificador industrial para Initiatives ation o beneficiamento de alimentos e refrigeradores tipo domésticos, tabuleiro de inox. SUB 139-3 / Aquisição de material de consumo para Component 1: Sustainable Pending realização de oficinas de Request for Single Stage - One 2019-10- 2019-11- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement capacitações e reuniões de Quotations Envelope 27 11 11 Initiatives ation planejamento: papel, canetas, canetões, etc. SUB 139-4 / Aquisição de gêneros alimentícios para Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-01- 2020-02- atividade de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 12 25 24 Avaliação/Aprovação do Initiatives ation Plano de Gestão Ambiental SUB 110-13 / CQ110.13 Aquisição de equipamentos para a infraestrutura do Component 1: Sustainable Pending viveiro como Termômetro Request for Single Stage - One 2019-11- 2019-11- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de vara Motobomba Sistema Quotations Envelope 04 17 27 Initiatives ation de irrigação Medidor de umidade de solo entre outros necessários SUB 110-3 / Aquisição de matérias hidraulicos para Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-11- 2019-12- construção do viveiro e sala TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 14 14 de armazenamento de Initiatives ation sementes Page 8 SUB 16-24 / Aquisição de Component 1: Sustainable Pending combustível para trator - Request for Single Stage - One 2019-10- 2019-11- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção de curvas de Quotations Envelope 30 10 10 Initiatives ation nível e bacias de contenção SUB 166 SC 006 / Aquisição de batedor ou processador tritura gelo, Component 1: Sustainable Under Request for Single Stage - One 2019-11- 2020-08- 2019-11- 2020-01- liquidificador com copo TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 12 20 19 completo inox, Balança Initiatives ation digital eletrônica, Balança digital, refrigerador grande e freezer horizontal. SUB 166 SC 010 / Aquisição de itens para estruturação da cozinha: talheres grandes para Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-11- 2020-01- cozinha, jogo de panela, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 20 19 conjunto talheres de mesa, Initiatives ation concha térmica para sorvete, conjunto de pratos de louça, copos tipo americanos, lixeira. Component 1: Sustainable SUB 170 - 7 / Mudas Request for Single Stage - One 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- TF / 18765 and Adaptive Community Post Limited 1,165.06 Completed frutíferas nativas Quotations Envelope 06 04 21 17 20 18 Initiatives SUB 263 - 4 / Aquisição de Component 1: Sustainable materiais fabricação Request for Single Stage - One 2019-11- 2019-11- 2019-11- 2019-11- 2020-01- 2019-11- TF / 18765 and Adaptive Community Post Limited 1,397.08 Completed artesanatos, como Quotations Envelope 06 05 17 07 16 18 Initiatives barbantes, linhas, lastex e cordões SUB 263 - 5 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-11- 2019-11- 2019-11- 2019-11- 2020-01- 2020-02- miçangas para produção de TF / 18765 and Adaptive Community Post Limited 1,048.58 Completed Quotations Envelope 06 19 17 21 16 01 artesanato Initiatives SUB 100 - 3 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- kit equipamento proteção TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 20 03 10 15 22 20 individual. Initiatives Development SUB 100-18 / Aquisição de Component 1: Sustainable Pending vestimentas de proteção Request for Single Stage - One 2019-11- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement individual: calças, camisetas Quotations Envelope 08 21 20 Initiatives ation e chapéus com proteção Component 1: Sustainable Pending SUB 100-19 / Aquisição de Request for Single Stage - One 2019-11- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Botas - EPI's Quotations Envelope 08 21 20 Initiatives ation Component 1: Sustainable SUB 110-36 / Aquisição de Request for Single Stage - One 2019-11- 2019-11- 2019-11- 2019-12- 2020-01- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,064.57 Completed adubo orgânico para plantio Quotations Envelope 08 21 21 04 20 20 Initiatives SUB 268 - 8 / Aquisição de material de construção para Component 1: Sustainable Request for Single Stage - One 2019-11- 2019-11- 2019-12- espaço sede para a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 21 21 cooperativa/ associação Initiatives indígena SUB 166 SC 004 / Aquisição de Seladora de Component 1: Sustainable embalagens plásticas a Request for Single Stage - One 2019-11- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled vácuo e despolpadeira de Quotations Envelope 04 17 16 Initiatives fruta , para estruturação da cozinha de processamento. SUB 74-13 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-12- câmera de ação, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 05 06 profissional. Initiatives SUB 74-14 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- utensílios para cozinha TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 21 14 comunitária Initiatives SUB 74-15 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- kits de material didático TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 21 14 para Oficinas Initiatives Component 1: Sustainable SUB 74-17 / Aquisição de Request for Single Stage - One 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled calças e botas Quotations Envelope 25 08 30 Initiatives SUB 47-5 / Aquisição de kit de materiais didáticos Component 1: Sustainable (caneta,papel Request for Single Stage - One 2019-03- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled madeira,pastas, cartolina, Quotations Envelope 05 19 08 Initiatives lápis de cor,bloco de anotação, borracha,lápis de escrever, pincel e papel A4 SUB 173 - 13 / Aquisição de material de construção Component 1: Sustainable Request for Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- (complemento) para TF / 18765 and Adaptive Community Post Limited 1,214.10 Completed Quotations Envelope 23 26 05 09 04 17 estruturação da unidade de Initiatives beneficiamento comunitária SUB 47-10 / Aquisição de materiais de construção para conclusão dos Component 1: Sustainable Request for Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- banheiros e parte do TF / 18765 and Adaptive Community Post Limited 1,340.67 Completed Quotations Envelope 23 22 04 03 19 05 acabamento da unidade de Initiatives beneficiamento como forros, areia, cimento, entre outros. SUB 98-20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-11- 2020-01- 2019-12- 2020-02- 2020-05- 2020-02- material de irrigação para TF / 18765 and Adaptive Community Post Limited 1,134.54 Completed Quotations Envelope 22 31 03 17 31 24 viveiro e horta comunitária Initiatives SUB 25-18 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-12- 2020-01- materiais de construção TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 06 20 para obra do galpão Initiatives ation comunitário Component 1: Sustainable SUB 98-19 / Aquisição de Request for Single Stage - One 2018-12- 2020-02- 2018-12- 2020-03- 2019-01- 2020-03- TF / 18765 and Adaptive Community Post Limited 4,082.13 Completed materiais de construção Quotations Envelope 01 18 22 04 21 09 Initiatives SUB 210- 7 / Aquisição de materiais para implantação de hortas: adubo organico, Cálcario agricola, tesoura Component 1: Sustainable Pending de poda, Rolo tela de Arame Request for Single Stage - One 2019-12- 2020-01- 2020-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement 1,80x50m, exadao com Quotations Envelope 17 10 10 Initiatives ation cabo, enxada com cabo, cavadeira articulada, mangueira 1/3 para irrigacao de gotejamento, boia de caixa d'água SUB 210- 8 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- material para produção de TF / 18765 and Adaptive Community Post Limited 1,783.17 Completed Quotations Envelope 17 09 03 23 04 13 artesanato Initiatives SUB 224 SC 003 / Aquisição de equipamentos Component 1: Sustainable Under para gestão do projeto e Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2020-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement uso da brigada voluntária: Quotations Envelope 24 20 10 10 Initiatives ation Gps, Rádio comunicador e Câmera fotográfica. SUB 201- 3 / Aquisição de Gêneros alimentícios para Realizar o resgate e o Component 1: Sustainable fortalecimento da festa pon Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,831.82 Completed hy pry (bola confeccionada Quotations Envelope 13 17 03 18 06 27 Initiatives com palha de milho) e resgate e o fortalecimento da festa rurut (esteira). SUB 129 -16 / Aquisição de câmera fotográfica, câmera Component 1: Sustainable Under Request for Single Stage - One 2019-12- 2020-01- 2020-03- filmadora, GPS, móveis de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 29 29 escritório (mesa e cadeiras) Initiatives ation e notebook Component 1: Sustainable SUB 71-13 / Request for Single Stage - One 2019-12- 2020-06- 2020-01- 2020-06- 2020-02- 2020-07- TF / 18765 and Adaptive Community Post Limited 2,522.70 Completed Monocultivador Quotations Envelope 28 09 22 18 21 03 Initiatives Component 1: Sustainable Under SUB 61-25 / Aquisição de Request for Single Stage - One 2020-01- 2020-05- 2020-01- 2020-03- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Estufa de secagem Quotations Envelope 02 26 29 09 Initiatives ation AI2-5 / Aquisição de kits Component 1: Sustainable Pending para agricultura: enxadas, Request for Single Stage - One 2020-01- 2020-01- 2020-03- TF / 18765 and Adaptive Community Post Limited 0.00 Implement picaretas, pás, carrinho de Quotations Envelope 11 25 25 Initiatives ation mão, etc AI2-9 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-02- 2020-03- combustível para moto TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 01 02 bomba Initiatives ation AI2-12 / Aquisição de Component 1: Sustainable generos alimentícios para Request for Single Stage - One 2020-01- 2020-02- 2020-01- 2020-03- 2020-02- TF / 18765 and Adaptive Community Post Limited 569.32 Signed assembleia geral do povo Quotations Envelope 09 27 24 05 23 Initiatives Terena AI2-13 / Aquisição de câmera fotográfica Component 1: Sustainable Under Request for Single Stage - One 2020-01- 2020-06- 2020-02- 2020-04- profissional e lente para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 10 04 04 fortalecimento/estruturação Initiatives ation Articulação Pacary SUB 56 - 21 / Aquisição de Component 1: Sustainable equipamentos para Request for Single Stage - One 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- TF / 18765 and Adaptive Community Post Limited 2,646.53 Completed funcionamento do poço Quotations Envelope 30 30 13 12 14 13 Initiatives artesiano comunitário. SUB 110-4 / Aquisição de materiais para construção do viveiro e sala de armazenamento de semente Component 1: Sustainable Request for Single Stage - One 2017-09- 2020-01- 2017-10- 2020-02- 2018-01- 2020-03- e reformar do banheiro para TF / 18765 and Adaptive Community Post Limited 2,406.82 Completed Quotations Envelope 23 28 17 21 15 10 dar suporte ao viveiro, Initiatives Materias construção diversos, Ripa plainada de 4metros, Tinta pva branca externa. SUB 110-37 / Aquisição de materiais elétricos para construção do viveiro e sala Component 1: Sustainable Request for Single Stage - One 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- de armazenamento de TF / 18765 and Adaptive Community Post Limited 344.20 Completed Quotations Envelope 07 28 02 17 01 13 semente e reforma do Initiatives banheiro para dar suporte ao viveiro BR-CAA-156151-GO-RFQ / Aquisição de materiais Component 2: Capacity Pending pedagógicos (ingredientes) Request for Single Stage - One 2020-02- 2020-02- 2020-03- TF / 18765 Building and Institutional Post Limited 0.00 Implement específicos para o curso de Quotations Envelope 04 16 17 Strengthening ation plantas medicinais - Plano de Capacitação DGM Brasil BR-CAA-156152-GO-RFQ / Aquisição de materiais de Component 2: Capacity Pending higiente e proteção para Request for Single Stage - One 2020-02- 2020-02- 2020-03- TF / 18765 Building and Institutional Post Limited 0.00 Implement manipulção durante o curso Quotations Envelope 05 17 18 Strengthening ation de plantas medicinais - Plano de Capacitação do DGM Brasil Component 1: Sustainable SUB 134 -16 / Aquisição de Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- TF / 18765 and Adaptive Community Post Limited 2,842.94 Signed roda d´água com bomba Quotations Envelope 01 11 12 17 27 Initiatives SUB 263 - 6 / Aquisição de equipamentos para estruturação da casa de Component 1: Sustainable Pending Request for Single Stage - One 2020-02- 2020-02- 2020-02- artesanato: 2 armários de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 18 19 aço; geladeira comum 300l; Initiatives ation bebedouro; fogão industrial, com forno à gás. SUB 263 - 7 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- máquina de costura reta e TF / 18765 and Adaptive Community Post Limited 772.22 Completed Quotations Envelope 04 10 16 12 26 03 máquina de costura Initiatives overlock SUB 216 - 2 / Aquisição de Component 1: Sustainable 3 GPS, 3 Notebooks e 1 Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-06- 2020-02- TF / 18765 and Adaptive Community Post Limited 242.70 Signed câmera fotográfica para Quotations Envelope 04 13 14 13 24 Initiatives estruturar o Conselho Terena Component 1: Sustainable SUB 30 - 37 / Aquisição de Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-03- TF / 18765 and Adaptive Community Post Limited 2,148.80 Completed Materiais de Construção Quotations Envelope 18 14 26 27 28 19 Initiatives SUB 30 - 38 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-03- 2020-05- 2020-04- 2020-05- 2020-06- 2020-08- móveis para escritório, TF / 18765 and Adaptive Community Post Limited 1,049.61 Completed Quotations Envelope 25 19 06 29 05 05 como: armários, mesas e Initiatives cadeiras SUB 268 -2 / Aquisição de material de construção para construção do galpão para Component 1: Sustainable Request for Single Stage - One 2020-03- 2020-09- 2020-04- 2020-10- 2020-05- fabricação de artesanato e TF / 18765 and Adaptive Community Post Limited 3,229.69 Signed Quotations Envelope 25 21 07 07 07 armazenamento da matéria- Initiatives prima e construção da sede da associação. SUB 250-5 / Aquisição de Component 1: Sustainable Pending 10 Armários / Roupeiros, Request for Single Stage - One 2020-03- 2020-04- 2020-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Aquisição de 10 estantes de Quotations Envelope 25 19 17 Initiatives ation ferro SUB 195 - 3 / Aquisição de Component 1: Sustainable Pending gêneros alimentícios para Request for Single Stage - One 2020-03- 2020-04- 2020-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement preparo das refeições Quotations Envelope 25 07 07 Initiatives ation durante atividades do projeto SUB 268 -9 / Aquisição de Component 1: Sustainable Pending ferramentas para produção Request for Single Stage - One 2020-03- 2020-04- 2020-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de artesanato: Quotations Envelope 25 06 05 Initiatives ation esmeriladeiras, etc (aquisição complementar) SUB 99 - 20 / Bombas Component 1: Sustainable Pending Request for Single Stage - One 2020-03- 2020-04- 2020-05- Submersa para poço TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 22 22 artesiano com placa solar Initiatives ation SUB 120 - 18 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-04- 2020-04- 2020-05- de celulares par o TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 03 21 21 subprojeto Initiatives ation Component 1: Sustainable Pending SUB 116.25 / Aquisição de Request for Single Stage - One 2020-04- 2020-05- 2020-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement roçadeira Quotations Envelope 05 02 01 Initiatives ation SUB 113 - 30 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-04- 2021-01- 2020-05- 2021-01- 2020-06- 2021-05- de equipamentos para TF / 18765 and Adaptive Community Post Limited 2,212.18 Completed Quotations Envelope 17 14 16 25 05 13 extração de mel Initiatives Component 1: Sustainable SUB 113 - 31 / Aquisição Request for Single Stage - One 2020-04- 2021-01- 2020-05- 2021-01- 2020-06- 2021-02- TF / 18765 and Adaptive Community Post Limited 881.48 Completed de Freezers Quotations Envelope 17 06 05 18 04 17 Initiatives BR-CAA-175571-GO-RFQ Component 3: Project Pending / Aquisição de um notebook Request for Single Stage - One 2020-05- 2020-06- 2020-07- TF / 18765 Management, Monitoring Post Limited 0.00 Implement para membro do Comite Quotations Envelope 29 09 09 and Evaluation ation Gestor Nacional SUB 100 - 20 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-05- 2020-07- 2020-06- 2020-07- 2020-07- 2020-08- de tachos de ferro para TF / 18765 and Adaptive Community Post Limited 3,529.30 Completed Quotations Envelope 28 10 11 22 11 12 produção de farinha Initiatives SUB 129 - 17 / Aquisição de peças de reposição para Component 1: Sustainable Request for Single Stage - One 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-08- veículo de apoio às TF / 18765 and Adaptive Community Post Limited 2,629.73 Completed Quotations Envelope 04 12 15 16 15 05 atividades de vigilância e Initiatives fiscalização da Terra Indígena Krahô. SUB 91-11 / Aquisição de Component 1: Sustainable implemento agrícola - Request for Single Stage - One 2020-06- 2020-06- 2020-07- 2020-07- 2020-07- 2020-09- TF / 18765 and Adaptive Community Post Limited 1,837.78 Completed Grade Aradora Mecânica Quotations Envelope 26 19 16 01 22 11 Initiatives para o subprojeto 91 SUB 109-8 / CT109.8 Component 1: Sustainable Pending Aquisição de Moinho para Request for Single Stage - One 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement unidade de beneficiamento Quotations Envelope 05 29 28 Initiatives ation do subprojeto SUB 109-5 / CT109.5 Component 1: Sustainable Pending Aquisição de equipamentos Request for Single Stage - One 2017-09- 2017-10- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para a unidade de Quotations Envelope 11 04 01 Initiatives ation beneficiamento SUB 170 - 8 / Aquisição de Component 1: Sustainable ferramentas agrícolas para Request for Single Stage - One 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- TF / 18765 and Adaptive Community Post Limited 1,958.62 Completed implementação dos Quotations Envelope 13 13 25 22 24 03 Initiatives pomares e roça coletiva SUB 170 - 9 / Aquisição de Component 1: Sustainable gêneros alimentícios Request for Single Stage - One 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- TF / 18765 and Adaptive Community Post Limited 221.54 Completed durante o trabalho na Quotations Envelope 13 13 25 22 24 03 Initiatives criação de pomares e roça coletiva SUB 2120 - 5 / Aquisição de freezer horizontal 385 Component 1: Sustainable Pending Request for Single Stage - One 2020-07- 2020-07- 2020-08- litros, Geladeira 400 L para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 25 24 estruturação de cozinha Initiatives ation comunitária. Page 9 SUB 2120 - 6 / Aquisição de balança digital, seladora Component 1: Sustainable Pending Request for Single Stage - One 2020-07- 2020-07- 2020-08- automática industrial, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 28 27 despolpadeira de frutas 10 Initiatives ation litros, seladora à vácuo. SUB 211 SC 010 / Component 1: Sustainable Pending Aquisição de: Request for Single Stage - One 2019-07- 2019-07- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Liquidificadores de alta Quotations Envelope 09 17 16 Initiatives ation rotação, batedeira industrial e fogão industrial SUB 211 - SC 011 / Component 1: Sustainable Pending Request for Single Stage - One 2020-07- 2020-07- 2020-08- Aquisição de máquina para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 25 24 fabricação de sorvete e Initiatives ation picolé SUB 91 - 10 / Aquisição de equipamentos Component 1: Sustainable Pending Request for Single Stage - One 2020-07- 2020-08- 2020-08- complementares para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 03 23 instalação do bombeamento Initiatives ation de água SUB 241-7 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-08- 2020-09- bomba d'água com placas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 03 17 16 solares Initiatives ation SUB 241-8 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-08- 2020-09- kit para irrigação e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 13 12 mangueira Initiatives ation AI2 - 14 / Kit de irrigação Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-10- 2020-08- 2020-10- 2020-09- 2021-01- para instalar o campo de TF / 18765 and Adaptive Community Post Limited 1,097.02 Completed Quotations Envelope 03 19 15 22 14 28 sementes Initiatives AI2 - 15 / Aquisição de Component 1: Sustainable material de construção para Request for Single Stage - One 2020-08- 2020-10- 2020-08- 2020-10- 2020-08- 2021-01- TF / 18765 and Adaptive Community Post Limited 2,167.06 Completed instalação de reservatório Quotations Envelope 03 08 12 16 27 28 Initiatives de água SUB 170 - 10 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- de mudas para TF / 18765 and Adaptive Community Post Limited 1,014.92 Completed Quotations Envelope 03 31 17 05 06 13 reflorestamento Initiatives AI2- 16 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2020-09- material para instalação de TF / 18765 and Adaptive Community Post Limited 1,939.96 Completed Quotations Envelope 09 25 20 03 19 25 viveiros Initiatives Component 1: Sustainable Pending AI2 -18 / Aquisição de Request for Single Stage - One 2020-08- 2020-08- 2020-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement mudas e sementes variadas Quotations Envelope 09 23 12 Initiatives ation SUB 45 - 26 / Aquisição de equipamentos de Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-09- 2020-10- informática: computador de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 15 15 mesa, notebook, projetor Initiatives ation multimídia, entre outros SUB 124 - 15 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-09- 2020-10- de micro-trator com TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 09 09 caçamba Initiatives ation AI2 - 19 / Aquisição de aparelhos eletrônicos para Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-09- 2020-11- gravação e eventos, como: TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 08 07 celular, caixa de som, tripé Initiatives ation e microfone. AI2 - 20 / Aquisição de equipamentos para Component 1: Sustainable Pending gravação, filmagem e Request for Single Stage - One 2020-08- 2020-09- 2020-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement fotografia como: lente para Quotations Envelope 26 08 07 Initiatives ation câmera, tripé, iluminador, bateria para câmera. AI2 - 21 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2021-01- itens para instalação de TF / 18765 and Adaptive Community Post Limited 2,869.94 Completed Quotations Envelope 26 25 06 29 06 28 sistema de irrigação Initiatives AI2 - 22 / Aquisição de combustível para manutenção de roça de Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-09- 2020-10- subsistência para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 03 03 fortalecimento de segurança Initiatives ation alimentar nas terras indígenas Cachoeirinha, Lalima e Pilad Rebuá SUB 179 - 10 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-04- 2020-06- 2020-05- 2020-06- 2020-05- 2020-08- de materiais para TF / 18765 and Adaptive Community Post Limited 2,011.04 Completed Quotations Envelope 17 19 06 26 26 05 construção dos galinheiros Initiatives SUB 179 - 11 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-09- 2020-09- 2020-10- de insumos para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 11 25 15 estruturação das hortas Initiatives ation comunitárias Component 1: Sustainable SUB 108 - 30 / Aquisição Request for Single Stage - One 2020-10- 2020-10- 2020-10- 2020-10- 2020-12- 2020-11- TF / 18765 and Adaptive Community Post Limited 1,343.02 Completed de gerador Quotations Envelope 03 03 24 03 23 18 Initiatives SUB 123 - 13 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-10- 2020-12- de materiais para produção TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 21 20 de artesanato - miçangas Initiatives ation COVID 19 - RS27 PRO TERRA / Aquisição de itens Component 1: Sustainable Pending de higiene e proteção Request for Single Stage - One 2020-10- 2020-10- 2020-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement individual: álcool em gel, Quotations Envelope 09 24 13 Initiatives ation água sanitária, sabão em barra, máscaras, detergente e sabonete COVID 19 - RS50 PEDRA PRETA / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- individual: máscaras, água TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 24 13 sanitária, álcool em gel, Initiatives ation sabonete, detergente, sabão em pó e papel higiênico. COVID 19 - RS54 CIMQCB / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- individual: medidor de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 24 13 temperatura, totem para Initiatives ation alcool em gel, alcool em gel, máscaras, água sanitária e sabão em barra COVID 19 - RS44 ASSEMA / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- individual: sabão de coco, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 24 13 sabonete, alcool gel, água Initiatives ation sanitária, desinfetante, sabão líquido, sabão em pó, máscaras de tecido SUB 110 - 37 / Aquisição Component 1: Sustainable de uma moto serra e um Request for Single Stage - One 2020-10- 2020-10- 2020-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled triturador de galhos e Quotations Envelope 09 31 30 Initiatives troncos para equipar a associação AI2 - 23 / Aquisição de Component 1: Sustainable 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-12- 2020-11- sementes orgânicas e não- TF / 18765 and Adaptive Community Post Direct Selection Direct 940.72 Completed 11 20 16 24 22 27 21 05 transgênicas certificadas. Initiatives SUB 28 - 18 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- materiais para sistema de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 08 08 irrigação Initiatives ation SUB 45 - 27 / Aquisição de Component 1: Sustainable mobiliário para escritório, Request for Single Stage - One 2020-10- 2020-11- 2020-11- 2020-11- 2020-12- 2020-12- TF / 18765 and Adaptive Community Post Limited 1,237.34 Completed incluindo mesas, cadeiras, Quotations Envelope 28 25 13 26 13 15 Initiatives armários. SUB 116 - 38 / Aquisição Component 1: Sustainable Under de material para construção Request for Single Stage - One 2020-10- 2020-11- 2020-11- 2020-12- TF / 18765 and Adaptive Community Post Limited 7,711.33 Implement do galpão de Quotations Envelope 28 24 13 13 Initiatives ation beneficiamento do azeite COVID 19 - RS68 PACARY / Aquisição de material de higiene e limpeza: xampu, condicionador, desodorante, Component 1: Sustainable Pending sabonetes, óleo de Request for Single Stage - One 2020-10- 2020-11- 2020-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement macauba, absorventes de Quotations Envelope 28 05 05 Initiatives ation pano, sabão em barra, desifentante, bucha vegetal, álcool líquido, álcool em gel, máscaras, sacola de pano e material para xarope COVID 19 - RS11 MIQCB / Aquisição de itens de higiene e proteção individual: água sanitária, Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- detergente líquido, sabão TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 05 05 em barra, alcool em gel para Initiatives ation mãos, máscaras de tecido, creme dental, embalagens plásticas para alcool em gel. COVID 19 - RS61 GORUTUBA / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- itens de higiene e proteção TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 05 05 individual: máscaras, água Initiatives ation sanitária, sabão neutro e álcool em gel. COVID 19 - RS47 ENAWENE / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- individual: sabão em barra, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 05 05 álcool em gel para mãos, Initiatives ation máscaras de tecido, sabonete em barra e vitamina C efervescente COVID 19 - RS2 NAX / Aquisição de ferramentas Component 1: Sustainable Pending para roça: machado, foice, Request for Single Stage - One 2020-10- 2020-11- 2020-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement enxada, rastelo de ferro, Quotations Envelope 28 06 06 Initiatives ation facão, lima, carrinho de mão, agulha para saco, fitilho de plástico. COVID 19 - RS35 HANAITI / Aquisição de itens de informática e equipamentos para estruturar a Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- associação: notebbok, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 08 08 transmissor de radio, mesa Initiatives ation digital, microfones, mesa, cadeira, antena de rádio, kit som, alcool em gel para mãos SUB 123 - 16 / Aquisição Component 1: Sustainable de materiais para produção Request for Single Stage - One 2020-11- 2020-11- 2020-12- 2020-12- 2021-01- 2020-12- TF / 18765 and Adaptive Community Post Limited 1,302.52 Completed de artesanato - Quotations Envelope 22 25 12 04 01 22 Initiatives miçangas III COVID 19 - RS48 ISA / Aquisição de carrinho de Component 1: Sustainable Pending mão, facão, peneira fina, Request for Single Stage - One 2020-11- 2020-12- 2020-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement bacia, caldeirão, faca Quotations Envelope 21 07 27 Initiatives ation peixeira, máscara de tecido, álcool em gel e álcool 70 SUB 123 17 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-11- 2020-11- 2020-12- 2020-11- 2021-02- combustível e oleo para as TF / 18765 and Adaptive Community Post Limited 2,013.95 Signed Quotations Envelope 22 18 06 24 04 atividades do projeto Initiatives COVID 19 - RS26 AMANU / Aquisição de seladora e Component 1: Sustainable Pending Request for Single Stage - One 2020-11- 2020-12- 2020-12- embalagens, à vácuo, para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 11 12 apoio em decorrência da Initiatives ation COVID SUB 98 - 21 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-11- 2021-01- 2020-12- 2021-01- 2021-01- sombrite, perfurador de TF / 18765 and Adaptive Community Post Limited 1,342.09 Signed Quotations Envelope 22 18 14 26 13 solo e roçadeira Initiatives Component 1: Sustainable SUB 110-38 / Aquisição de Request for Single Stage - One 2020-11- 2020-12- 2020-12- 2020-12- 2021-01- 2020-12- TF / 18765 and Adaptive Community Post Limited 2,007.03 Completed triturador Quotations Envelope 23 03 13 08 12 16 Initiatives COVID 19 - RS70 APOINME / Ferramentas para plantio, abastecimento de água: moto serra, sabre, corrente, Component 1: Sustainable Pending caixa d'água, calha, suporte Request for Single Stage - One 2020-11- 2020-12- 2021-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de calha, tela Quotations Envelope 26 05 04 Initiatives ation sombreamento, tela galinheiro, válvula, mangueira, enxada, foice, cavadeira, rastelo, regador, tubo e adesivo PVC, serrote, alicate. SUB 224 - SC 004 / Component 1: Sustainable Pending Request for Single Stage - One 2020-11- 2020-12- 2021-01- Aquisição de gêneros TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 12 11 alimentícios para atividades Initiatives ation do projeto COVID 19 - RS14 SÃO MODESTO / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-11- 2020-12- 2021-01- individual: álcool em gel, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 07 06 álcool líquido, sabão em Initiatives ation barra, detergente, sabão em pó e máscara de tecido. SUB 109 - 16 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-12- 2020-12- 2021-01- de telhas tipo sanduíche TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 16 29 28 para reforma do entreposto Initiatives ation SUB 129 - 18 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-12- 2020-12- 2021-01- de miçangas para produção TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 27 16 de artesanato Initiatives ation COVID 19 - RS59 RAIS / Aquisição de filtros de Component 1: Sustainable Pending Request for Single Stage - One 2020-12- 2020-12- 2021-01- barros, álcool em gel, água TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 13 21 20 sanitária, sabão em barra, Initiatives ation sabonete em barra e borrifadores COVID 19 - RS22 SUMARÉ PERUAÇÚ / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-12- 2020-12- 2021-01- individual: álcool em gel, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 13 21 20 água sanitária, sabonete Initiatives ation líquido para as mãos, luva descartável e máscara descartável COVID 19 - RS43 REDE CERRADO / Aquisição de Component 1: Sustainable Pending equipamentos de Request for Single Stage - One 2020-12- 2020-12- 2021-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement informática: notebook, Quotations Envelope 13 24 23 Initiatives ation celular, impressora, antena de internet, hd externo. SUB 125 - 18 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-12- 2021-03- 2021-01- 2021-03- 2021-01- de materiais de materiais de TF / 18765 and Adaptive Community Post Limited 1,239.59 Signed Quotations Envelope 24 09 03 31 13 escritório Initiatives Component 1: Sustainable Pending SUB 181 - 4 / Aquisição de Request for Single Stage - One 2020-12- 2021-01- 2021-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement mudas para plantio Quotations Envelope 24 06 05 Initiatives ation SUB 211 - 11 / Aquisição de eletrodomésticos para Component 1: Sustainable Pending estruturação da cozinha Request for Single Stage - One 2020-12- 2021-01- 2021-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement comunitária: geladeira, Quotations Envelope 25 05 04 Initiatives ation freezers, micro-ondas e máquina de lavar SUB 181 - 5 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2021-01- 2021-01- 2021-02- kit de ferramentas para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 06 19 18 plantio Initiatives ation SUB 25 - 19 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2021-01- 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- portas e janelas para galpão TF / 18765 and Adaptive Community Post Limited 567.91 Completed Quotations Envelope 16 15 27 03 26 10 comunitário Initiatives COVID 19 - RS52 NROZAWI / Aquisição de itens de higiene e proteção: creme Component 1: Sustainable Pending Request for Single Stage - One 2021-01- 2021-02- 2021-03- dental, escova de dente, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 04 06 sabão em barra, água Initiatives ation sanitária, máscaras, luvas, termômetros, sabonete, sabão líquido. BR-CAA-215507-GO-RFQ Component 3: Project Pending / Aquisição de climatizador Request for Single Stage - One 2021-01- 2021-02- 2021-03- TF / 18765 Management, Monitoring Post Limited 0.00 Implement para utilização no escritório Quotations Envelope 29 11 13 and Evaluation ation da agência executora SUB 25-1 / CQ25.1 Component 1: Sustainable Aquisição de mudas plantas Request for Single Stage - One 2018-04- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled apropriadas para Quotations Envelope 06 09 08 Initiatives recuperação de áreas degradadas SUB 26-10 / CT26.10 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Aquisicao de materiais TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 02 25 19 didaticos Initiatives Component 1: Sustainable SUB 26-5 / CT26.5 Request for Single Stage - One 2017-06- 2018-05- 2017-07- 2019-03- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Aquisição de GPS Quotations Envelope 30 28 18 10 Initiatives FS_1.5 01 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2021-04- 2021-04- 2021-06- saca de sementes de milho TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 04 26 25 e feijão Initiatives ation Page 10 AI2 - 24 / Aquisição de material de irrigação para Component 2: Capacity Pending Request for Single Stage - One 2021-04- 2021-04- 2021-05- Aldeia Tuxá (MG): aspersor, TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 03 14 14 tubo, registro, curva, entre Strengthening ation outros. AI2 - 25 / Aquisição de Component 2: Capacity Pending Request for Single Stage - One 2021-04- 2021-04- 2021-05- arames e telas para TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 03 14 14 instalação na Aldeia Tuxá Strengthening ation (MG) FS_1.3 03 / Aquisição de câmera filmadora, câmera Component 1: Sustainable Pending Request for 2021-04- 2021-04- 2021-06- fotográfica e câmera de TF / 18765 and Adaptive Community Post 0.00 Implement Quotations 04 26 25 ação e Aquisição de kit para Initiatives ation vídeo conferência. FS_1.2 01 / Aquisição de equipamentos de informática, sendo: notebooks, computadores tipo desktop, nobreak, Component 1: Sustainable Pending Request for Single Stage - One 2021-04- 2021-05- 2021-07- mouses sem fio e kits de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 25 24 mouse e teclado sem fio; Initiatives ation equipamentos para projeção de imagens (projetor e tela); aquisição de impressoras e aquisição de smartphones. SUB 109 - 18 / Aquisição Component 1: Sustainable Pending de estrutura metálica para Request for Single Stage - One 2021-04- 2021-05- 2021-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement instalação do telhado do Quotations Envelope 29 14 13 Initiatives ation entreposto do babaçu SUB 16 - 27 / Aquisição de Component 1: Sustainable Pending bomba para retirada de Request for Single Stage - One 2021-05- 2021-05- 2021-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement água do poço artesiano Quotations Envelope 01 16 15 Initiatives ation instalado na comunidade SUB 195 - 4 / Aquisição de gêneros alimentícios para Component 1: Sustainable Pending Request for Single Stage - One 2021-05- 2021-05- 2021-06- oficina formativa, com TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 14 27 26 representantes mulheres Initiatives ation das aldeias da TI Sangradouro FS_26 1.1 / Aquisição de Component 2: Capacity Pending Request for Single Stage - One 2021-05- 2021-06- 2021-07- balanças digitais e seladoras TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 21 07 07 de pedal Strengthening ation FS_25 1.1 1 / Aquisição de forno elétrico para torrar Component 2: Capacity Pending farinha, aquisição de prensa Request for Single Stage - One 2021-05- 2021-06- 2021-09- TF / 18765 Building and Institutional Post Limited 0.00 Implement de ferro para produção de Quotations Envelope 31 18 16 Strengthening ation farinha e aquisição de ralador de mandioca FS_4 1.1 / Aquisição de Component 2: Capacity Pending ferramentas agrícolas: Request for Single Stage - One 2021-05- 2021-06- 2021-07- TF / 18765 Building and Institutional Post Limited 0.00 Implement enxadas, foices e Quotations Envelope 28 10 10 Strengthening ation plantadeiras manuais. FS_195 1.1_SUB 99 - 22 / Component 1: Sustainable Pending Request for Single Stage - One 2021-05- 2021-06- 2021-08- Aquisição de geradores à TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 31 21 20 energia a diesel Initiatives ation BR-CAA-238190-GO-RFQ / Aquisição de Component 3: Project Pending equipamentos para internet Request for Single Stage - One 2021-06- 2021-06- 2021-08- TF / 18765 Management, Monitoring Post Limited 0.00 Implement rural - apoio membro do Quotations Envelope 11 30 29 and Evaluation ation CGN: antena, cabos, conectores, torre, swicht, entre outros. BR-CAA-238191-GO-RFQ / Aquisição de Component 3: Project Pending Request for Single Stage - One 2021-06- 2021-06- 2021-08- equipamentos para internet TF / 18765 Management, Monitoring Post Limited 0.00 Implement Quotations Envelope 11 30 29 rural - apoio membro do and Evaluation ation CGN: antena, modem e roteador SUB 90 - 7 / Aquisição de Component 1: Sustainable Pending impressora para impressão Request for Single Stage - One 2021-06- 2021-06- 2021-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de lotes e validade, para Quotations Envelope 15 27 30 Initiatives ation rotulagem de produtos SUB 98 - 22 / Aquisição de Component 1: Sustainable Pending material de construção Request for Single Stage - One 2021-06- 2021-07- 2021-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement complementar para Quotations Envelope 20 12 11 Initiatives ation construção do galpão SUB 109 - 19 / Aquisição de material de construção Component 1: Sustainable Pending para fase de acabamento da Request for Single Stage - One 2021-06- 2021-06- 2021-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção do galpão do Quotations Envelope 16 29 29 Initiatives ation entreposto de babaçu - materiais elétricos SUB 268 - 11 / Aquisição Component 1: Sustainable Pending de uma betoneira para Request for Single Stage - One 2021-06- 2021-07- 2021-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement auxiliar nas obras do Quotations Envelope 18 01 31 Initiatives ation galpão, na comunidade SUB 109 - 20 / Aquisição de materiais hidráulicos e Component 1: Sustainable Pending materiais de construção Request for Single Stage - One 2021-06- 2021-07- 2021-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement (para reservatório) para fase Quotations Envelope 20 16 15 Initiatives ation final de construção de entreposto de babaçu. NON CONSULTING SERVICES Activity Reference No. Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual BR-CAA-3291-NC-RFB / contratacao de empresa especializada em servicos de agenciamento de viagens Component 1: Sustainable Single Stage - One 2015-06- 2015-07- 2015-07- 2019-09- 2015-09- 2015-09- 2015-10- 2015-11- 2015-12- 2015-11- 2016-12- e fornecimento de TF / 18765 and Adaptive Community Post Request for Bids Open - National 291,879.28 Signed Envelope 24 08 09 20 01 01 28 09 16 24 16 passagens aereas regionais Initiatives nacionais e internacionais e passagens terrestres para realizacao das atividades BR-CAA-3309-NC-RFQ / contratacao de servico de nao consultoria durante primeiro edital para Component 2: Capacity producao de videos com Request for Single Stage - One 2016-12- 2016-12- 2017-01- 2017-01- 2018-04- TF / 18765 Building and Institutional Post Limited 14,630.04 Signed captacao de imagens e Quotations Envelope 21 22 18 25 13 Strengthening decupagem e roteiro e edicao e tratamento de imagem e finalizacao de quatro videos curtos e um video institucional BR-CAA-3319-NC-RFQ / contratacao de empresa especializada em servicos Component 3: Project Pending de auditoria externa para Request for Single Stage - One 2017-01- 2017-02- 2018-02- TF / 18765 Management, Monitoring Post Limited 0.00 Implement auditar os documentos Quotations Envelope 04 02 08 and Evaluation ation projeto referente ao exercicio dois mil e quinze e dois mil e dezesseis BR-CAA-3257-NC-RFQ / contratacao de servico de nao consultoria para de impressao cartilhas Component 2: Capacity Pending Request for Single Stage - One 2017-02- 2017-03- 2019-03- tematicas para apresentacao TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 19 31 27 do projeto e publicacao da Strengthening ation avaliacao dos resultados por edicao dos relatorios finais do primeiro edital BR-CAA-3289-NC-RFQ / contratacao de servico para producao de pecas graficas de cartilha com construcao Component 2: Capacity Pending de layout e definicao de Request for Single Stage - One 2017-02- 2017-03- 2017-06- TF / 18765 Building and Institutional Post Limited 0.00 Implement fonte e espacamento e Quotations Envelope 12 20 18 Strengthening ation marca de texto e elemento grafico e diretrizes de diagramacao do material que sera diagramado pela equipe BR-CAA-4658-NC-RFQ / contratacao de empresa para prestacao de servico Component 3: Project nao continuados para Request for Single Stage - One 2015-12- 2015-12- 2015-12- 2015-12- 2016-02- 2016-02- TF / 18765 Management, Monitoring Post Limited 787.27 Completed realizacao de um evento de Quotations Envelope 02 01 23 23 21 20 and Evaluation reuniao anual do comite gestor nacional com locacao de sala e servico de coffee break BR-CAA-4671-NC-RFQ / contratacao de empresa para prestacao de servico de transporte para o primeiro Component 2: Capacity Under Request for Single Stage - One 2016-01- 2016-01- 2016-01- 2016-03- intercambio nacional TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 06 06 14 14 membros do comite gestor Strengthening ation nacional a ser ralizado em sao joao das missoes em minas gerais BR-CAA-4665-NC-RFQ / contratacao de empresa para prestacao de servicos para oficina de divugacao Component 1: Sustainable Pending de editais e treinamento Request for Single Stage - One 2016-01- 2016-02- 2016-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para qualificacao propostas Quotations Envelope 19 02 02 Initiatives ation com fornecimento de coffee break e refeicoes e locacao de espaco e hospedagem realizacao em brasilia BR-CAA-4659-NC-RFQ / contratacao de empresa para prestacao de servicos para oficina de divugacao Component 1: Sustainable Pending de editais e treinamento Request for Single Stage - One 2015-12- 2016-02- 2016-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para qualificacao propostas Quotations Envelope 28 11 11 Initiatives ation com fornecimento de coffee break e refeicoes e locacao de espaco e hospedagem realizacao em imperatriz BR-CAA-4661-NC-RFQ / contratacao de empresa para prestacao de servicos para oficina de divugacao Component 1: Sustainable Under de editais e treinamento Request for Single Stage - One 2016-01- 2017-02- 2016-02- 2016-04- TF / 18765 and Adaptive Community Post Limited 31,807.01 Implement para qualificacao propostas Quotations Envelope 13 02 04 04 Initiatives ation com fornecimento de coffee break e refeicoes e locacao de espaco e hospedagem realizacao em cuiaba BR-CAA-4673-NC-RFQ / contratacao de servicos graficos para material pedagogico tipo impressao Component 1: Sustainable Pending Request for Single Stage - One 2016-01- 2016-03- 2016-05- de cracha de bloco e pasta TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 22 21 de papel realizacao de tres Initiatives ation oficinas de divulgacao e duas de elaboracao projeto e tres seminarios BR-CAA-4668-NC-RFQ / Component 2: Capacity contratacao de servico de Request for Single Stage - One 2016-04- 2016-04- 2016-04- 2016-04- 2016-06- 2016-06- TF / 18765 Building and Institutional Post Limited 307.10 Completed impressao de folder para Quotations Envelope 20 20 25 25 24 25 Strengthening apresentacao do projeto BR-CAA-4660-NC-RFQ / contratacao de empresa para prestacao de servicos de coffee break para Component 3: Project Pending realizacao de reunioes do Request for Single Stage - One 2016-06- 2016-06- 2017-01- TF / 18765 Management, Monitoring Post Limited 0.00 Implement comite gestor nacional Quotations Envelope 03 12 29 and Evaluation ation sendo a segunda reuniao extraordinaria e a terceira reuniao ordinaria do ano de dois mil e dezesseis a ser realizado em brasilia BR-CAA-4672-NC-RFQ / contratacao de empresa para prestacao de servicos com fornecimento de coffee Component 2: Capacity Request for Single Stage - One 2016-06- 2016-06- 2016-07- 2016-07- 2016-08- 2016-08- break e refeicao e locacao TF / 18765 Building and Institutional Post Limited 8,014.75 Completed Quotations Envelope 25 27 11 11 10 09 de espaco e hospedagem e Strengthening sistema de projecao de som e flip chart para seminario nacional de fortalecimento institucional BR-CAA-4667-NC-RFQ / contratacao de empresa para a prestacao de servicos com fornecimento de coffee Component 3: Project Pending break refeicao e locacao de Request for Single Stage - One 2015-11- 2015-12- 2016-02- TF / 18765 Management, Monitoring Post Limited 0.00 Implement espaco com hospedagem e Quotations Envelope 17 23 21 and Evaluation ation sistema de projecao de som e flip chart para oficina de elaboracao de projeto a ser realizado em montes claros BR-CAA-4670-NC-RFQ / contratacao de empresa para a prestacao de servicos com fornecimento de coffee Component 1: Sustainable Pending break refeicao e locacao de Request for Single Stage - One 2016-11- 2016-12- 2017-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement espaco com hospedagem e Quotations Envelope 22 28 07 Initiatives ation sistema de projecao de som e flip chart para oficina de elaboracao de projeto a ser realizado em cuiaba BR-CAA-3259-NC-RFQ / contratacao de empresa para a prestacao de servicos com fornecimento de coffee Component 2: Capacity Pending Request for Single Stage - One 2017-07- 2017-08- 2017-10- break refeicao e locacao de TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 29 18 17 espaco com hospedagem e Strengthening ation sistema de projecao de som e flip chart para Primeiro Seminário - tema de Redd. Local: Brasilia BR-CAA-17761-NC-RFQ / Contratação de empresa para a prestação de serviços técnicos, não continuados, Component 2: Capacity Pending Request for Single Stage - One 2017-07- 2017-08- 2017-10- para Oficina Interna REDD+. TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 15 04 03 Fornecimento de: Coffe Strengthening ation break, Refeição (almoço/jantar), locação espaço e hospedagem, sala. BR-CAA-3263-NC-RFQ / Contratacao de empresa Component 2: Capacity Pending para prestacao de servico de Request for Single Stage - One 2017-09- 2017-09- 2017-11- TF / 18765 Building and Institutional Post Limited 0.00 Implement transporte nao continuados Quotations Envelope 04 24 23 Strengthening ation para segundo intercambio nacional. Tema sobre Redd. BR-CAA-3269-NC-RFQ / Contratacao de empresa para a prestacao de servicos com fornecimento de coffee break refeicao e locacao de Component 2: Capacity Pending Request for Single Stage - One 2017-07- 2017-09- 2017-11- espaco com hospedagem e TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 28 11 10 sistema de projecao de som Strengthening ation e flip chart para segundo seminario temático. Tema: Atuando com Povos e Comunidades Tradicionais BR-CAA-3213-NC-RFQ / Contratacao de empresa para prestacao de servico de Component 2: Capacity Pending Request for Single Stage - One 2017-09- 2017-11- 2018-01- transporte nao continuados TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 22 06 05 para terceiro intercambio Strengthening ation nacional local evento a ser definido. Tema RAI. BR-CAA-3260-NC-RFQ / Contratacao de empresa para a prestacao de servicos com fornecimento de coffee break refeicao e locacao de Component 2: Capacity Pending Request for Single Stage - One 2018-03- 2018-05- 2018-06- espaco com hospedagem e TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 17 01 30 sistema de projecao de som Strengthening ation e flip chart para terceiro seminario temático. Tema: Políticas Públicas, Programas e ações govern BR-CAA-17790-NC-RFQ / Serviço de Instalação de Ar Component 3: Project Pending Condicionado Piso/Teto Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 Management, Monitoring Post Limited 0.00 Implement Split, potência 36.000btus - Quotations Envelope 11 01 30 and Evaluation ation para estruturação da sala reuniões DGM BR-CAA-17792-NC-RFQ / Prestação de serviço para readequação, suporte, no sistema informatizado Component 3: Project SIG/CAA, de mecanismos 2017-06- 2017-10- 2017-07- 2017-10- 2019-12- TF / 18765 Management, Monitoring Post Direct Selection Direct 18,540.50 Signed deimplementações para 19 10 10 10 27 and Evaluation gestão e monitoramento financeiro e de progresso de execução do projeto DGM/FIP/Brasil. Component 1: Sustainable Pending SUB 4-1 / CT4.1 Serviços 2017-07- 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais de mateiro 20 25 04 03 Initiatives ation Page 11 SUB 4-9 / CT4.9. Serviços Component 1: Sustainable Pending Request for Single Stage - One 2018-02- 2018-03- 2018-05- de confecção de folder TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 06 16 05 camisetas e bonés. Initiatives ation SUB 4-10 / CT4.10. Contratação de assessoria Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-01- 2017-08- 2018-03- 2018-11- técnica para acompanhar e TF / 18765 and Adaptive Community Post Limited 12,344.98 Signed Quotations Envelope 24 25 02 22 25 subsidiar a execução das Initiatives atividades do projeto. SUB 16-11 / CQ16-11 Serviço gerais de jovens Component 1: Sustainable Pending comunitários para Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement realização do diagnostico Quotations Envelope 30 24 23 Initiatives ation socioambiental participativo com trinta e seis famílias SUB 25-2 / CQ25.2 Component 1: Sustainable Pending Aquisição de diversos 2017-06- 2017-07- 2017-07- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement lanches e refeiçoes com a 19 06 28 20 Initiatives ation comunidade para cercamento de nascentes SUB 25-3 / CQ25.3 Contratação de profissional Component 1: Sustainable Pending para moderar e instruir Request for Single Stage - One 2018-03- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement sobre plantio manejo Quotations Envelope 25 11 10 Initiatives ation monitoramento e cuidados com as mudas SUB 25-5 / CQ25.5 Serviços gráficos de diagramação ou produção Component 1: Sustainable Pending de arte e produção de cento Request for Single Stage - One 2017-07- 2017-07- 2018-03- TF / 18765 and Adaptive Community Post Limited 0.00 Implement e cinquenta cartilhas para Quotations Envelope 06 28 25 Initiatives ation divulgação e reprodução de vinte e cinco apostilas para formação sobre o plantio e manejo de mudas SUB 25-10 / CQ25.10 Component 1: Sustainable Pending Contratação de serviços de 2018-01- 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement mão de obra para 05 22 13 25 Initiatives ation construção de cerca SUB 25-12 / CQ25.12 Component 1: Sustainable Pending Contratação de serviço de Request for Single Stage - One 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Limited 0.00 Implement frete para transporte de Quotations Envelope 24 21 23 Initiatives ation produtos e insumo SUB 25-14 / CQ25.13 Component 1: Sustainable Pending Contratação de serviço de Request for Single Stage - One 2018-07- 2018-08- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement aluguel de veiculo para o Quotations Envelope 01 02 28 Initiatives ation transporte de pessoas SUB 25-13 / CQ25.14 Contratação de profissional para formar as famílias Component 1: Sustainable Pending 2017-06- 2017-07- 2017-07- 2017-09- envolvidas quanto a TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 20 07 28 12 questões ligadas a Initiatives ation preservação e proteção das nascentes envolvendo gênero e geração SUB 25-15 / CQ25.15 Contratação de profissional com formação politica quanto a gênero e etinia por Component 1: Sustainable Pending diária para instruir na 2017-08- 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement oficina de treinamento de 16 01 22 06 Initiatives ation apoio a formação das famílias quanto as questões de preservação e protecao das nascentes envolvendo genero SUB 25-16 / CQ25.16 Contratação de profissional com formação na área de Component 1: Sustainable Pending meio ambiente por diária 2017-10- 2017-11- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement para atuar em uma oficina 20 07 29 28 Initiatives ation de formação das famílias sobre questões de catalogação de nascentes envolvendo gênero e geração SUB 26-4 / CT26.4 Contratação de servicos Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-09- 2017-08- 2018-09- 2017-09- 2018-09- gráficos para confecção de TF / 18765 and Adaptive Community Post Limited 155.19 Completed Quotations Envelope 02 04 21 06 30 15 camisetas banners e Initiatives impressão de caderno SUB 26-7 / CT26.7 Contratacao de servicos de logistica de evento no municipio de Caceres em Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-08- 2017-07- 2018-09- 2017-09- 2018-10- defesa e protecao ao bioma TF / 18765 and Adaptive Community Post Limited 229.11 Completed Quotations Envelope 03 22 21 03 19 03 cerrado como forma de Initiatives sensibilizacao e tambem para a amostra de produtos sustentaveis SUB 26-12 / CT26.12 Component 1: Sustainable Pending Contratacao profissionais Request for Single Stage - One 2017-07- 2017-08- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para servicos de articulacao Quotations Envelope 15 08 30 Initiatives ation por diaria SUB 45-8 / CT45.8 Contratacao de servico de Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-08- moderacao e instrutoria TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 21 30 para oficina de gestao Initiatives ation organizacional SUB 45-10 / CT45.10 Contratacao de servico de Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-02- moderacao e instrutoria TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 16 25 para curso de seguranca do Initiatives ation trabalho SUB 45-11 / CT45.11 Component 1: Sustainable Pending Contratacao de servico de Request for Single Stage - One 2017-11- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement moderacao e instrutoria Quotations Envelope 18 15 29 Initiatives ation para curso sobre a saude da mulher SUB 45-19 / CT45.19 Component 1: Sustainable Aquisicao de kit de material Request for Single Stage - One 2017-06- 2017-11- 2017-07- 2017-11- 2017-08- 2017-12- TF / 18765 and Adaptive Community Post Limited 394.95 Completed didatico para cursos oficinas Quotations Envelope 28 06 17 09 16 08 Initiatives e intercambios SUB 45-21 / CT45.21 Contratacao de servicos Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-07- 2017-09- 2018-09- graficos para impressao de TF / 18765 and Adaptive Community Post Limited 782.73 Completed Quotations Envelope 10 21 03 27 12 04 folder banners e confeccao Initiatives de camisetas SUB 45-22 / CT45.22 Component 1: Sustainable Pending Locacao de veiculo micro Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement onibus com capacidade para Quotations Envelope 29 21 30 Initiatives ation 20 passageiros SUB 55-6 / CT55.6 Component 1: Sustainable Pending Aquisicao e instalacao de Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement uma Cisterna para captacao Quotations Envelope 25 18 27 Initiatives ation de agua de chuva SUB 55-9 / CT55.9 Locacao Component 1: Sustainable de veiculos para Request for Single Stage - One 2017-07- 2017-09- 2017-07- 2017-10- 2018-05- TF / 18765 and Adaptive Community Post Limited 2,185.39 Signed atendimento de diversas Quotations Envelope 01 27 18 17 14 Initiatives finalidades de execucao do Subprojeto SUB 55-13 / CT55.13 Contratacao de profissional Component 1: Sustainable para assessoria tecnica Request for Single Stage - One 2017-07- 2018-01- 2017-07- 2018-03- 2018-05- 2019-03- TF / 18765 and Adaptive Community Post Limited 11,568.52 Completed para acompanhar e Quotations Envelope 02 25 27 20 23 20 Initiatives subsidiar a execucao das atividades do projeto SUB 55-17 / CT55.17 Contratacao de profissional especializado com Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-09- 2017-10- experiencia em TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 21 31 agroindustria familiar e Initiatives ation comunitaria para ministrar Oficina de Capacitacao em Compostagem SUB 55-18 / CT55.18 Contratacao de profissional Component 1: Sustainable Pending especializado para ministrar Request for Single Stage - One 2017-08- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Oficina de Capacitacao em Quotations Envelope 31 22 11 Initiatives ation Uso e Aproveitamento de Cagaita SUB 55-19 / CT55.19 Contratacao de profissional Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-02- especializado para ministrar TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 15 24 oficina de capacitacao em Initiatives ation uso e aproveitamento do Araticum SUB 56-11 / CT56.11 Servico de hora maquina de Component 1: Sustainable Request for Single Stage - One 2017-09- 2019-06- 2017-10- 2019-06- 2019-01- 2019-07- pa carregadeira para TF / 18765 and Adaptive Community Post Limited 3,341.01 Completed Quotations Envelope 21 03 16 12 09 25 construcao de bacias de Initiatives contencao de aguas pluviais SUB 56-12 / CT56.12 Component 1: Sustainable Pending Servico de horas maquina Request for Single Stage - One 2017-10- 2017-11- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de trator para retirada dos Quotations Envelope 25 20 19 Initiatives ation eucaliptos nas areas de recarga SUB 56-13 / CT56.13 Contratacao de servicos de Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-03- instrutor para ministrar TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 15 26 quatro oficinas para Initiatives ation implantacao de sistemas agroflorestais SUB 56-14 / CT56.14 Contratacao de servicos Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-09- 2017-10- graficos para confeccao de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 20 30 materiais de divulgacao Initiatives ation boletins SUB 61-16 / CQ61.16 Component 1: Sustainable Pending Contratação de profissional Request for Single Stage - One 2017-07- 2017-07- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para realizar assessoria Quotations Envelope 06 26 22 Initiatives ation técnica ao subprojeto SUB 61-18 / CQ61.18 Contratação de profissional técnico para realizar Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-09- 2018-04- capacitação de valoração da TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 30 18 produção artesanal Initiatives ation quilombola existente na comunidade SUB 71-4 / CT71.4 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-06- 2017-07- 2018-08- 2019-03- Contratação de agentes TF / 18765 and Adaptive Community Post Limited 5,274.07 Signed Quotations Envelope 04 20 24 29 16 locais comunitários Initiatives SUB 71-6 / CT71.6 Contratação de assessoria Component 1: Sustainable Under Request for Single Stage - One 2017-07- 2018-02- 2017-07- 2019-04- técnica para acompanhar e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 08 28 19 subsidiar a execução das Initiatives ation atividades do subprojeto SUB 75-2 / CQ75.2 Contratação de servicos de Component 1: Sustainable Pending comunicação e imprensa Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para acompanhamento a Quotations Envelope 06 31 04 Initiatives ation eventos criação e suporte da pagina de facebook SUB 90-2 / CT90.2 Contratação de servicos de identidade visual para desenvolver e aprimorar Component 1: Sustainable embalagens com identidade Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled visual coerente as Quotations Envelope 08 31 09 Initiatives comunidades e com linguagem visual que torne os produtos ecossociais mais interessantes no mercado SUB 90-3 / CT90.3 Contratação de servicos Component 1: Sustainable gráficos de confecção de Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled rótulos diversos com Quotations Envelope 09 31 09 Initiatives identidade e linguagem visual das comunidades SUB 90-4 / CT90.4 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-10- Contratação de servicos TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 02 01 para realização de quinze Initiatives fretes SUB 99-13 / CT99.13 Component 1: Sustainable Pending Contratacao de servicos Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement graficos para impressao de Quotations Envelope 12 04 03 Initiatives ation folder e banners SUB 99-14 / CT99.14 Fornecimento de alimentação para Oficina Component 1: Sustainable Pending sobre agroecologia 2017-07- 2017-07- 2017-08- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement Funcionamento do PAIS 06 16 03 30 Initiatives ation Intercambio Oficina de agroecologia Oficinas sobre o manejo do sistema PAIS SUB 99-15 / CT99.15 Contratação de profissional Component 1: Sustainable Pending para assessoria técnica no Request for Single Stage - One 2017-07- 2017-08- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement processo de produção Quotations Envelope 13 03 24 Initiatives ation agrícola e manejo da unidade produtiva SUB 105-1 / CQ105.1 Contratação de serviços de técnicos para elaboração e Component 1: Sustainable Pending Request for Single Stage - One 2018-09- 2018-10- 2018-11- socialização do caderno de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 16 30 planos de gestão e praticas Initiatives ation de produção tradicionais quilombolas SUB 105-3 / CQ105.3 Contratação de serviço de Component 1: Sustainable locação de veículos para os 2017-07- 2019-06- 2017-07- 2019-06- 2017-08- 2019-07- 2018-03- 2019-07- TF / 18765 and Adaptive Community Post Direct Selection Direct 1,933.97 Completed eventos de Encontro da 10 25 20 27 02 09 30 29 Initiatives juventude e Caravana quilombola do jalapão SUB 105-5 / CQ105.5 Component 1: Sustainable Pending Contratação de serviços de Request for Single Stage - One 2017-07- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement diagnostico e elaboração do Quotations Envelope 17 08 07 Initiatives ation plano de gestão territorial SUB 105-11 / CQ105.11 Contratação de serviços gerais de Cozinheira em Component 1: Sustainable Pending diversas comunidades por 2017-07- 2017-07- 2017-07- 2018-07- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement diária para Oficinas 11 16 27 22 Initiatives ation Elaboração do plano de gestão territorial Encontro da juventude e Caravana quilombola do jalapão SUB 109-1 / CT109.1 Contratação de serviços Component 1: Sustainable Pending Request for Single Stage - One 2017-07- 2017-08- 2017-12- gerais de pedreiro para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 14 12 reforma do entreposto dos Initiatives ation produtos do babaçu SUB 110-23 / CQ110.23 Contratação de serviços gerais, por diária, de Component 1: Sustainable 2017-07- 2017-08- 2017-08- 2017-09- tratorista para fazer a TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 28 07 21 30 marcação das curvas de Initiatives nível e terraceamento na área com erosão SUB 110-25 / CQ110.25 Component 1: Sustainable Contratação de serviços de Request for Single Stage - One 2018-01- 2018-02- 2018-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled locação de veículos ônibus Quotations Envelope 23 19 16 Initiatives para intercâmbios SUB 116-16 / CT116.16 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-09- 2017-10- Serviço de confecção de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 14 04 09 camisetas de divulgação Initiatives ation SUB 116-22 / CT116.22 Component 1: Sustainable Pending Contratação de serviços 2017-08- 2017-08- 2017-09- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement locação de lancha para 11 19 04 29 Initiatives ation expedição fluvial SUB 116-23 / CT116.23 Contratação de serviços Component 1: Sustainable Pending 2017-08- 2017-08- 2017-08- 2017-09- gerais de pedreiro, por TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 01 08 21 25 diária, para construção do Initiatives ation reservatório de água SUB 116-24 / CT116.24 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- Contratação de serviços TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 28 02 para instalação elétrica e Initiatives ation hidráulico SUB 130-6 / CT130.6 Contratação de serviços Component 1: Sustainable Request for Single Stage - One 2017-08- 2019-01- 2017-08- 2018-01- 2017-09- 2018-02- gráficos para impressão de TF / 18765 and Adaptive Community Post Limited 558.86 Completed Quotations Envelope 01 16 21 29 30 28 capa do catálogo dos Initiatives produtos Jatobá Pequi e Baru Page 12 SUB 130-8 / CT130.8 Contratação de serviços Component 1: Sustainable para analise final Request for Single Stage - One 2017-08- 2019-06- 2017-08- 2019-06- 2017-10- 2019-08- TF / 18765 and Adaptive Community Post Limited 2,990.65 Completed microbiológica e Quotations Envelope 04 10 25 19 04 15 Initiatives bromatológica do beneficiamento do Jatobá Pequi e Baru Component 1: Sustainable SUB 3-16 / Contratação de 2017-07- 2017-08- 2017-08- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled serviços de cozinheiras/os 26 09 25 26 Initiatives SUB 3-18 / Contratação de Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-11- serviço para construção de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 26 31 01 um barracão rústico Initiatives SUB 74-4 / Contratação de Component 1: Sustainable Request for Single Stage - One 2017-08- 2019-10- 2017-08- 2019-10- 2018-01- 2019-10- empresas locação de TF / 18765 and Adaptive Community Post Limited 750.60 Completed Quotations Envelope 02 15 16 17 03 17 veículos. Initiatives Component 1: Sustainable Pending SUB 108-1 / Contratação 2018-08- 2018-08- 2018-10- 2018-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement de serviços de cozinheira. 03 24 01 03 Initiatives ation SUB 28-2 / Contratação de Component 1: Sustainable serviços de aluguel de micro- Request for Single Stage - One 2018-01- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled ônibus para transporte de Quotations Envelope 05 06 09 Initiatives passageiros Component 1: Sustainable SUB 28-3 / Contratação de 2018-01- 2018-02- 2018-03- 2018-04- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled serviços de cozinheiras. 15 06 09 16 Initiatives SUB 113-5 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2017-10- 2017-11- 2018-12- de serviço para produção de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 06 07 14 materiais de divulgação. Initiatives ation BR-CAA-23125-NC-RFQ / Contratação de empresa para prestação de serviço, Component 3: Project Request for Single Stage - One 2017-08- 2016-12- 2017-08- 2016-12- 2018-02- 2017-02- não continuados, para TF / 18765 Management, Monitoring Post Limited 21,956.12 Completed Quotations Envelope 03 01 09 20 05 17 realização de 04 (quatro) and Evaluation eventos - reuniões do comitê gestor nacional SUB 113-8 / Serviços de Component 1: Sustainable Pending digramação de impressão Request for Single Stage - One 2017-10- 2017-11- 2018-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de materiais de divulgação Quotations Envelope 02 03 10 Initiatives ation da cultura indígena Chiquitana SUB 120-4 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2019-05- de serviço de locação TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 14 02 24 veículo Initiatives ation Component 1: Sustainable Pending SUB 120-6 / Contratação Request for Single Stage - One 2017-09- 2017-10- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de serviços de contabilidade Quotations Envelope 14 02 24 Initiatives ation Component 1: Sustainable Pending SUB 120-7 / Contratação Request for Single Stage - One 2017-11- 2017-11- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de serviços de transporte Quotations Envelope 09 27 16 Initiatives ation SUB 135-4 / Contratação de profissional em áudio Component 1: Sustainable Pending Request for Single Stage - One 2017-10- 2017-10- 2017-12- visual, para registro das TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 26 25 etapas do projeto e Initiatives ation capacitação de jovens cineastas Component 1: Sustainable Pending SUB 135-5 / Contratação Request for Single Stage - One 2017-09- 2017-10- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de serviços de tratorista Quotations Envelope 18 02 23 Initiatives ation SUB 42-1 / Serviços de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-12- capturas de imagens para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 11 11 construção de um vídeo Initiatives ation SUB 42-2 / Serviço de Component 1: Sustainable Pending Request for Single Stage - One 2018-09- 2018-09- 2018-11- confecção de Banner de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 11 28 28 90cmX1,20m Initiatives ation SUB 42-3 / Serviço de Component 1: Sustainable Pending confecção de Placa de Request for Single Stage - One 2017-12- 2018-02- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement identificação do projeto de Quotations Envelope 19 05 04 Initiatives ation vigilância irom cati. SUB 42-4 / Serviço de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2018-02- fornecimento de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 16 14 combustíveis e lubrificantes Initiatives ation SUB 120-3 / Contratação Component 1: Sustainable Pending de serviços de locação de Request for Single Stage - One 2017-09- 2017-10- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement caminhonete comunitária Quotations Envelope 25 11 23 Initiatives ation para transporte de combustível SUB 113-2 / Contratação de agente de animação na comunidade, para realizar: 1-organização para Component 1: Sustainable construção dos apiários - 2- Request for Single Stage - One 2017-09- 2017-10- 2018-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled organização e Quotations Envelope 15 02 06 Initiatives acompanhamento da instalação e funcionamento dos viveiros e monitoramento do processo de produção de mudas SUB 30 - 2 / Serviço de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2018-11- fornecimento de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 10 15 combustível para o projeto. Initiatives ation Component 1: Sustainable SUB 26-2 / CT26.2 Request for Single Stage - One 2017-06- 2018-09- 2017-07- 2018-11- 2018-02- TF / 18765 and Adaptive Community Post Limited 2,842.63 Signed Locações de veículos. Quotations Envelope 30 19 17 06 12 Initiatives SUB 135-1 / Contratação Component 1: Sustainable Pending de serviços de cozinheira 2017-09- 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement que será realizado por 11 21 04 04 Initiatives ation pessoa local. SUB 135-2 / Contratação Component 1: Sustainable Pending de indígena especializado 2017-09- 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement em madeiramento nativo - 11 21 04 04 Initiatives ation indígena 1 SUB 135-3 / Contratação Component 1: Sustainable Pending de marceneiro para 2017-09- 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement construção de estrutura 11 23 06 06 Initiatives ation para armazenamento de sementes SUB 135-23 / Contratação Component 1: Sustainable Pending 2017-09- 2017-09- 2017-10- 2017-12- de 01 indígena TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 11 20 03 04 especializados em Initiatives ation madeiramento nativo SUB 28-13 / Serviços de Component 1: Sustainable fornecimento de lanche para 2017-09- 2017-09- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled manejo e produção de 04 10 26 26 Initiatives adubo verde SUB 28-14 / Serviços de Component 1: Sustainable fornecimento de lanche para 2017-09- 2017-10- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled manejo ecológico de pragas 25 02 17 16 Initiatives e doenças de frutíferas SUB 28-15 / Serviços de Component 1: Sustainable fornecimento de lanche para 2018-03- 2018-03- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled associativismo e 23 31 16 15 Initiatives comercialização SUB 28-16 / Serviços de fornecimento de lanche para Component 1: Sustainable 2018-10- 2018-10- 2018-11- 2019-01- produção de mudas de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 15 21 06 05 frutíferas para Initiatives comercialização SUB 3-15 / Contratação de serviços de tratoristas para Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-01- plantio de mudas e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 12 04 11 30 sementes no entorno das Initiatives aldeias Aopá - Madzabdze SUB 28-9 / erviços de fornecimento de lanche para Component 1: Sustainable participantes da 2017-09- 2017-09- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled capacitações em: manejo 04 10 26 26 Initiatives ecológico de frutíferas e manejo ecológico do solo SUB 4-6 / CT4.6. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 42-7 / Contração de Component 1: Sustainable Pending agente comunitário 1 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-8 / Contração de Component 1: Sustainable Pending agente comunitário 2 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-9 / Contração de Component 1: Sustainable Pending agente comunitário 3 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-10 / Contração de Component 1: Sustainable Pending agente comunitário 4 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-11 / Contração de Component 1: Sustainable Pending agente comunitário 5 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-12 / Contração de Component 1: Sustainable Pending agente comunitário 6 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-13 / Contração de Component 1: Sustainable Pending agente comunitário 7 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-14 / Contração de Component 1: Sustainable Pending agente comunitário 8 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-15 / Contração de Component 1: Sustainable Pending agente comunitário 9 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-16 / Contração de Component 1: Sustainable Pending agente comunitário 10 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-18 / Serviços de serraria para realizar Component 1: Sustainable Pending adequação de barracão para 2017-09- 2017-10- 2017-10- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement servir de sede do projeto e 23 07 24 02 Initiatives ation para acondicionar equipamentos SUB 4-11 / CT4.11. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 4-12 / CT4.12. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 4-13 / CT4.13 Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes SUB 4-14 / CT4.14. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes SUB 4-15 / CT4.15. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes SUB 4-16 / CT4.16. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes SUB 4-17 / CT4.17. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 4-18 / CT4.18. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 4-19 / CT4.19. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 16-2 / CQ16-2 Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-01- 2017-07- 2018-03- 2017-10- Serviços de perfuração de TF / 18765 and Adaptive Community Post Limited 8,037.54 Signed Quotations Envelope 30 23 24 02 02 poço artesiano. Initiatives SUB 134-1 / Serviço de Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2019-03- mão de obra geral de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 27 04 22 17 viveirista Initiatives SUB 56-10 / CT56.10 Component 1: Sustainable 2017-06- 2017-07- 2017-07- 2017-08- Contratacao de servico de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 29 08 19 28 pedreiro por diaria Initiatives SUB 56-15 / CT56.15 Contratacao de servico de Component 1: Sustainable cozinheira por diaria para 2017-07- 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled quatro oficinas comunitaria 10 15 07 21 Initiatives de capacitacao mapeamento e planejamento participativo SUB 42-5 / Serviço de cozinheira para 01 oficina de capacitação sobre o Component 1: Sustainable 2017-09- 2017-09- 2017-10- 2017-10- trabalho de vigilância, TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 05 19 06 27 planejamento e orientação Initiatives sobre como serão formados os grupos de trabalho a cada etapa SUB 42-37 / Serviço de cozinheira 2 para 01 oficina de capacitação sobre o Component 1: Sustainable trabalho de vigilância, 2017-09- 2017-09- 2017-10- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled planejamento e orientação 05 19 06 27 Initiatives sobre como serão formados os grupos de trabalho a cada etapa SUB 127-1 / Servico de cozinheira 1 para Component 1: Sustainable cozimentos alimentos da 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled primeira etapa construcao 20 04 18 07 Initiatives de centro de revitalizacao da cultura e visitacao SUB 127-2 / Servico de cozinheira 2 para Component 1: Sustainable cozimentos alimentos 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled primeira etapa construcao 20 04 18 07 Initiatives de centro de revitalizacao da cultura e visitacao. SUB 127-3 / Servico de cozinheira 1 para Component 1: Sustainable cozimentos alimentos 2017-12- 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled segunda etapa construcao 15 28 15 04 Initiatives de centro de revitalizacao da cultura e visitacao SUB 127-4 / Servico de cozinheira 2 para Component 1: Sustainable cozimentos alimentos 2017-12- 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled segunda etapa construcao 15 28 15 04 Initiatives de centro de revitalizacao da cultura e visitacao Page 13 SUB 127-5 / Servico de mao de obra indigena 1 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indigena SUB 127-6 / Servico de mao de obra indigena 2 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indígena SUB 127-7 / Servico de mao de obra indigena 3 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indígena SUB 127-8 / Servico de mao de obra indigena 4 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indígena SUB 127-9 / Servico de mao de obra indigena 5 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indígena SUB 127-10 / Servico de mao de obra profissional Component 1: Sustainable indigena para retirada de 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled madeiras para construcao 24 08 21 30 Initiatives do centro de revitalizacao da cultura e visita SUB 127-11 / Servico de auxiliar mao de obra 1 para Component 1: Sustainable retirada de madeiras para 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled construcao do centro de 24 08 21 30 Initiatives revitalizacao da cultura e visita SUB 127-12 / Servico de auxiliar mao de obra 2 para Component 1: Sustainable retirada de madeiras para 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled construcao do centro de 24 08 21 30 Initiatives revitalizacao da cultura e visita SUB 127-13 / Servico de auxiliar mao de obra 3 para Component 1: Sustainable retirada de madeiras para 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled construcao do centro de 24 08 21 30 Initiatives revitalizacao da cultura e visita SUB 127-14 / Servico de de Component 1: Sustainable desenvolvimento de website Request for Single Stage - One 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e treinamento para Quotations Envelope 12 03 22 Initiatives alimentacao do site SUB 127-15 / Contratação de frete comunitário Component 1: Sustainable indigena para transporte de Request for Single Stage - One 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled madeira e palhas que serão Quotations Envelope 12 04 03 Initiatives utilizadas na construção do Centro de Revitalizacao - frete 1 SUB 127-17 / Servico de frete comunitario indigena Component 1: Sustainable para transporte de madeira Request for Single Stage - One 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e palhas que serao Quotations Envelope 07 26 25 Initiatives utilizadas na construcao do Centro de Revitalizacao - frete 3 SUB 127-18 / Servico de frete comunitario indigena Component 1: Sustainable para transporte de madeira Request for Single Stage - One 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e palhas que serao Quotations Envelope 07 26 25 Initiatives utilizadas na construcao do Centro de Revitalizacao - frete 4 SUB 127-19 / Servicos para Component 1: Sustainable criacao de layout e Request for Single Stage - One 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled impreessao de folders para Quotations Envelope 07 21 19 Initiatives divulgacao do projeto SUB 127-20 / Servicos de Component 1: Sustainable confeccao de camisetas para Request for Single Stage - One 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled divulgacao do Centro de Quotations Envelope 04 22 10 Initiatives Revitalizacao SUB 127-22 / Servico de Component 1: Sustainable empreita de mao de obra de Request for Single Stage - One 2017-12- 2018-01- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled ajudante de pedreiro para Quotations Envelope 28 15 25 Initiatives construcao do centro SUB 16-5 / CQ16-5 Serviço Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-01- 2017-07- 2018-01- 2017-08- 2018-02- de confecção de banner TF / 18765 and Adaptive Community Post Limited 70.49 Completed Quotations Envelope 29 10 23 24 07 05 para divulgação do Initiatives subprojeto SUB 26-11 / CT26.11 Contratacao de maquinario Component 1: Sustainable Pending Request for Single Stage - One 2017-11- 2017-12- 2018-01- por hora para fazer TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 23 22 barraginhas em duas grotas Initiatives ation da comunidade SUB 16-16 / Serviços de Component 1: Sustainable Request for Single Stage - One 2017-11- 2017-12- 2017-12- 2018-02- 2017-12- 2018-03- Confecção de camisetas de TF / 18765 and Adaptive Community Post Limited 396.51 Completed Quotations Envelope 20 11 12 22 29 28 divulgação do Subprojeto. Initiatives SUB 142 -3 / Servicos acompanhamento do Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-12- processo de abertura da TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 23 06 15 18 23 21 roCa e producao do Initiatives Development ation relatorio - comunitário 1 SUB 125 - 1 / Serviço de Component 1: Sustainable Community Pending 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- tratorista indígena para TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 18 01 08 10 19 20 correção do solo. Initiatives Development ation SUB 125 - 2 / Serviço de Component 1: Sustainable Community Pending instrutor para ministrar 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement oficina de capacitação na 18 01 08 12 19 20 Initiatives Development ation correção de solo. Component 1: Sustainable Community Pending SUB 125 - 4 / Serviço de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement confecção de camisetas. 22 05 15 16 23 26 Initiatives Development ation SUB 125 - 6 / Serviço de Component 1: Sustainable Community Pending 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- análise de amostra de solo TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 28 11 18 22 29 30 em laboratório. Initiatives Development ation SUB 125 - 7 / Serviço de instrutor para ministrar Component 1: Sustainable Community 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- oficina de aplicação de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 28 11 18 22 29 28 composto de Initiatives Development micronutrientes e adubos orgânicos. SUB 124 - 1 / Contratação de serviços para Component 1: Sustainable Community acompanhamento técnico 2018-01- 2018-09- 2018-01- 2018-09- 2018-02- 2018-09- 2018-02- 2018-10- 2018-02- 2018-11- 2019-10- TF / 18765 and Adaptive Community Post Driven Limited 4,254.74 Signed do projeto para Orientação 12 27 26 28 05 27 06 23 13 01 07 Initiatives Development técnica de plantio e manutenção de áreas de SAF. SUB 124 - 6 / Aquisição de Component 1: Sustainable Community 2018-01- 2019-04- 2018-02- 2019-04- 2018-02- 2019-04- 2018-02- 2019-04- 2018-02- 2019-04- 2018-04- 2019-10- mudas de plantas nativas TF / 18765 and Adaptive Community Post Driven Limited 4,304.14 Completed 24 08 07 08 16 09 19 11 26 11 26 09 para recuperação de áreas. Initiatives Development SUB 124 - 7 / Aquisição de sementes diversas de Component 1: Sustainable Community 2018-01- 2019-10- 2018-02- 2019-10- 2018-02- 2019-10- 2018-02- 2019-11- 2018-02- 2019-11- 2018-04- 2019-12- leguminosas e ou crioulas, TF / 18765 and Adaptive Community Post Driven Limited 1,326.13 Completed 29 29 12 29 20 29 22 11 28 18 30 18 aquisição de calcário para Initiatives Development correção de PH do solo AI2 - 2 / Contratação de Component 1: Sustainable Community serviço de impressão para 2017-12- 2018-08- 2017-12- 2018-09- 2018-01- 2018-10- 2018-01- 2018-10- 2018-01- 2018-10- 2019-01- 2019-07- TF / 18765 and Adaptive Community Post Driven Limited 3,358.93 Completed produção de peças de 16 28 30 12 06 11 08 11 17 17 12 17 Initiatives Development comunicação. SUB 100 - 1 / Contratação de serviço de mediador para Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-05- encontro do grupo de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 25 08 17 19 26 28 soberania alimentar - roças Initiatives Development ation tradicionais e desafio de hoje. SUB 85 - 1 / Serviço de Component 1: Sustainable Community Assessoria técnica para 2018-01- 2018-03- 2018-01- 2018-03- 2018-02- 2018-03- 2018-02- 2018-04- 2018-02- 2018-05- 2019-07- TF / 18765 and Adaptive Community Post Driven Limited 11,516.31 Signed recuperação das áreas 15 23 29 23 05 26 09 24 16 07 21 Initiatives Development degradadas. AI1 - 1 / Serviço de articulação indígena para Component 1: Sustainable Community Pending dar suporte no 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement planejamento, mobilizar os 09 22 30 31 06 07 Initiatives Development ation participantes indígenas, elaborar relatoria - ARTICULADOR 1 AI1 - 2 / Serviço de articulação indígena para Component 1: Sustainable Community Pending dar suporte no 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement planejamento, mobilizar os 22 29 30 31 06 07 Initiatives Development ation participantes indígenas, elaborar relatoria - ARTICULADOR 2. AI1 - 3 / Contratação de serviço de técnico especializado de terceiros Component 1: Sustainable Community Pending 2017-12- 2017-12- 2017-12- 2017-12- 2018-01- 2018-05- para elaboração de site TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 05 18 26 28 02 02 institucional e treinamento Initiatives Development ation de indígena para atualização de conteúdos. AI1 - 4 / Contratação de serviço logística com locação de espaço de Component 1: Sustainable Community Pending reunião, hospedagem e 2017-12- 2017-12- 2017-12- 2017-12- 2018-01- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement alimentação para realização 05 18 26 27 02 02 Initiatives Development ation de eventos do Planejamento Estratégico para fortalecimento político e institucional da MOPIC. AI3 - 1 / Contratação de serviço de confecção de material de divulgação da Component 1: Sustainable Community 2017-12- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-02- 2018-05- 2019-02- feira dos produtos do TF / 18765 and Adaptive Community Post Driven Limited 761.39 Completed 26 25 08 25 15 29 19 31 26 01 28 11 babaçu e agricultura Initiatives Development familiar como banners, bandeiras e faixas e outros. BR-CAA-39558-NC-RFQ / Contratacao de empresa para fornecimento de serviço de coffe break para Component 3: Project Pending realizacao de treinamento e Request for Single Stage - One 2018-01- 2018-02- 2018-03- TF / 18765 Management, Monitoring Post Limited 0.00 Implement planejamento equipe e Quotations Envelope 15 03 05 and Evaluation ation estagiarios para visita de checagem do segundo edital do projeto DGM. A ser realizado em Montes Claros MG SUB 98 - 16 / Contratacao de profissional tecnica para Component 1: Sustainable Community Pending 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-04- assessorar no mapeamento TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 19 29 12 14 20 21 das areas de abundância no Initiatives Development ation entorno da aldeia Porteira. SUB 135-24 / Serviços de mao de obra especializada Component 1: Sustainable Community Pending em bio construcao para 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement execucao e 22 01 09 12 16 17 Initiatives Development ation acompanhamento de construcao de galpao para armazenamento de sementes SUB 26-17 / CT26.17 Contratacao de profissional Component 1: Sustainable tecnico para fazer o Request for Single Stage - One 2017-07- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled mapeamento da morraria Quotations Envelope 31 30 29 Initiatives com entrega do mapa etnoambiental SUB 108-27 / Contratacao de prestação de servicos Component 1: Sustainable Community Pending para realizacao de 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement capacitacao em boas 22 02 12 15 22 23 Initiatives Development ation praticas para produção de alimentos tecnicas comunitarias SUB 108-28 / Contratacao de prestacao de servicos Component 1: Sustainable Community Pending para realizacao de 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement capacitacao em gestao da 22 05 12 15 22 23 Initiatives Development ation unidade de beneficiamento produtos locais SUB 113-21 / Contratacao Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-05- de oficineiro para realizacao TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 25 08 15 21 01 20 de oficina de apicultura Initiatives Development ation SUB 142-16 / Serviços acompanhamento do Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-12- processo de abertura da TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 23 06 15 19 24 21 roça e produção do relatório Initiatives Development ation - comunitário 2 SUB 91-10 / Serviço Técnico de apoio para execução do projeto no processo de implantação do Component 1: Sustainable Community 2018-01- 2020-07- 2018-02- 2020-07- 2018-02- 2020-07- 2018-02- 2020-07- 2018-02- 2020-07- 2018-07- 2020-08- viveiro de mudas, de TF / 18765 and Adaptive Community Post Driven Limited 1,144.36 Completed 25 17 07 17 15 22 19 24 26 28 06 11 beneficiamento de sementes Initiatives Development para plantio na fase de estufa, planejamento e orientação técnica na recuperação da APP. SUB 98 - 4 / Serviço Técnico de apoio para execução do projeto para Component 1: Sustainable Community 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-04- ministrar um curso aos TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 22 30 12 16 23 24 membros da diretoria da Initiatives Development associação e comunidade sobre rotinas administrativas. SUB 88-7 / Serviço Técnico Component 1: Sustainable Request for Single Stage - One 2018-01- 2018-02- 2019-05- de apoio para execução do TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 29 15 12 projeto. Initiatives SUB 30 - 11 / Serviço de Component 1: Sustainable instrutor para capacitação Request for Single Stage - One 2017-11- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled na área de gestão Quotations Envelope 11 28 29 Initiatives administrativa e financeira . SUB 30 - 12 / Serviço de Component 1: Sustainable instrutor para capacitação Request for Single Stage - One 2017-10- 2017-11- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled na área de elaboração de Quotations Envelope 28 14 15 Initiatives projetos. SUB 30 - 13 / Serviço de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- instrutor para capacitação TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 25 25 em gestão e legislação Initiatives ambiental. SUB 30-34 / SUB 30-34 Component 1: Sustainable Community Pending Serviço de apoio operacional 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-06- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para execução das 15 22 05 09 16 01 Initiatives Development ation atividades subprojeto TAPAGUIA. SUB 143 -1 / SUB 143 -1 Serviço de apoio operacional Component 1: Sustainable Community Pending 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-03- para execução das TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 15 25 02 03 05 14 atividades subprojeto Povos Initiatives Development ation do Roncador. SUB 93-1 / SUB 93-1 Component 1: Sustainable Community Serviço de apoio operacional 2018-01- 2018-04- 2018-01- 2018-04- 2018-02- 2018-04- 2018-02- 2018-05- 2018-02- 2018-05- 2018-12- TF / 18765 and Adaptive Community Post Driven Limited 3,615.52 Signed para execução das 12 19 19 19 02 20 06 04 13 28 10 Initiatives Development atividades subprojeto Pyka Mix. SUB 125 - 5 / SUB 125 - 5 Component 1: Sustainable Community Pending serviço de apoio operacional 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2019-10- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para execução das 19 02 09 12 19 13 Initiatives Development ation atividades subprojeto Terena. SUB 108-26 / SUB 108-26 Component 1: Sustainable Community Pending serviço de apoio operacional 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-07- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para execução das 16 22 05 09 16 01 Initiatives Development ation atividades subprojeto Yomono. SUB 134-14 / SUB 134-14 Component 1: Sustainable Community Serviço de apoio operacional 2018-01- 2018-06- 2018-01- 2018-06- 2018-02- 2018-06- 2018-02- 2018-06- 2018-02- 2018-07- 2019-03- TF / 18765 and Adaptive Community Post Driven Limited 3,022.75 Signed para execução das 19 20 29 20 12 20 14 20 21 27 28 Initiatives Development atividades subprojeto UBAWAWE. SUB 25-8 N / Serviços Component 1: Sustainable gráficos de impressão de Request for Single Stage - One 2018-05- 2018-06- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled apostila para atividade Quotations Envelope 15 04 06 Initiatives Oficina sobre plantio de mudas. SUB 25-11 N / Serviços Component 1: Sustainable Request for Single Stage - One 2019-01- 2019-02- 2019-03- gráficos de impressão de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 19 23 cartilha. Initiatives Page 14 SUB 120-1 / Contratação Component 1: Sustainable 2017-09- 2017-10- 2017-10- 2019-03- de serviços de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 21 05 23 07 cozinheiras/os Initiatives SUB 120-2 / Contratação Component 1: Sustainable 2017-08- 2017-09- 2017-09- 2019-05- de serviços de articuladores TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 28 11 28 22 indígenas. Initiatives SUB 26 -15 / SUB 26.15 Component 1: Sustainable Community Under Serviço de apoio operacional 2018-02- 2017-10- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- 2018-06- 2018-12- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para execução das 28 24 05 31 16 07 16 20 17 Initiatives Development ation atividades subprojeto ARPEP SUB 25- 7 N / Serviço de Component 1: Sustainable Community Pending 2018-02- 2018-02- 2018-03- 2018-03- 2018-03- 2019-12- apoio operacional para a TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 22 28 09 12 16 26 execução do subprojeto. Initiatives Development ation SUB 25-9 N / Serviço de fornecimento diversos lanches produzidos para as capacitações, Formação da Component 1: Sustainable Pending comunidade sobre Request for Single Stage - One 2018-03- 2018-04- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement recuperação ambiental, Quotations Envelope 20 06 04 Initiatives ation Identificação de nascentes, Oficina sobre plantio de mudas, Seminário temático em agroecologia e avaliação. SUB 100 -10 / Contratação de serviço de apoio Component 1: Sustainable Community 2018-03- 2018-06- 2018-03- 2018-06- 2018-04- 2018-06- 2018-04- 2018-07- 2018-04- 2018-07- 2019-12- operacional para TF / 18765 and Adaptive Community Post Driven Limited 8,646.39 Signed 15 06 22 06 05 21 09 20 16 20 07 implantação de sistemas Initiatives Development agroflorestais e práticas de manejo SUB 116-25 / CT116.25 Component 1: Sustainable Contratação de serviços Request for Single Stage - One 2017-08- 2020-07- 2017-09- 2020-08- 2017-10- 2020-08- TF / 18765 and Adaptive Community Post Limited 1,410.36 Completed para montagem de seis Quotations Envelope 21 20 13 06 23 12 Initiatives sistemas de irrigação SUB 116-26 / CT116.26 Component 1: Sustainable Contratação de serviços Request for Single Stage - One 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para montagem de seis Quotations Envelope 25 14 19 Initiatives estufas das hortas SUB 116-27 / CT116.27 Contratação de serviços técnico as famílias beneficiarias para Component 1: Sustainable Implantação dos três Request for Single Stage - One 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Agroquintais Aspectos de Quotations Envelope 02 25 24 Initiatives abertura de berços e plantio das mudas Preparo de defensivos naturais Orientação das familias sobre tratos culturais e adubacao SUB 116-28 / CT116.28 Cotratacao de serviços técnicos para Mobilização Curso teórico e pratico Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2018-06- sobre a coleta seletiva e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 03 28 24 destinação do lixo Initiatives Monitoramento da coleta seletiva do lixo e elaboração de relatórios sobre a poluicao da comunidade SUB 116-29 / CT116.29 Contratação de serviços técnicos para: Mobilização Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2019-06- de famílias aptas a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 18 10 comercializar Initiatives Acompanhamento e orientação dos produtores nas feiras SUB 116-30 / CT116.30 Contratação de serviços Component 1: Sustainable técnicos para orientação Request for Single Stage - One 2017-10- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled pratica sobre o processo de Quotations Envelope 31 23 02 Initiatives decantação simples da água do rio SUB 116-31 / CT116.31 Contratação de serviços Component 1: Sustainable técnicos para mapeamento Request for Single Stage - One 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled das famílias que precisam Quotations Envelope 20 12 24 Initiatives do CAR e Georeferenciamento das áreas para gerar o CAR SUB 116-32 / CT116.32 Contratação de serviços técnico para treinamento as família quanto a Preparação Component 1: Sustainable das áreas para receber as Request for Single Stage - One 2017-08- 2017-09- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled hortas Preparação e plantio Quotations Envelope 11 04 03 Initiatives de canteiros Transplante das mudas Orientação as famílias sobre preparo de defensivos natuais SUB 116-33 / CT116.33 Contratação de serviços de assessoramento técnico Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2018-05- para Avaliação e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 19 17 monitoramento dos Initiatives resultados e Estruturação de quatro relatórios descritivos de atividades SUB 116-35 / Serviço de Component 1: Sustainable Community apoio operacional para 2018-03- 2018-06- 2018-03- 2018-06- 2018-04- 2018-06- 2018-04- 2018-06- 2018-04- 2018-07- 2019-12- TF / 18765 and Adaptive Community Post Driven Limited 15,211.48 Signed execução das atividades 15 19 22 19 04 28 09 30 17 31 08 Initiatives Development subprojeto ASSEMA SUB 129 - 8 / Contratação de serviços de apoio Component 1: Sustainable Community Pending 2018-07- 2018-07- 2018-08- 2018-08- 2018-08- 2018-10- operacional para articulação TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 11 23 02 10 30 30 de atividades de produção Initiatives Development ation do artesanato e monitoramento do território. SUB 129 - 10 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2018-07- 2018-08- 2018-11- de serviços de moderador TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 30 01 de oficina sobre comércio Initiatives ation justo. SUB 129 - 12 / Contratação Component 1: Sustainable Pending de serviços de edição de Request for Single Stage - One 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement vídeos, a ser realizado por Quotations Envelope 23 30 01 Initiatives ation um indígena da comunidade. SUB 129 - 13 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2018-07- 2018-08- 2018-10- de mão de obra de pedreiro TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 30 01 para construção de galpão. Initiatives ation SUB 129 - 14 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2018-06- 2018-08- 2018-10- de serviços de transporte de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 30 01 passageiros para Initiatives ation expedições. SUB 123 -3 / Contratação de técnico em Component 1: Sustainable bioconstrução para Request for Single Stage - One 2018-03- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled construção de forno para Quotations Envelope 28 10 11 Initiatives queima de cerâmica, conforme os conhecimentos tradicionais. SUUB 129 - 9 / Contratação Component 1: Sustainable Pending de serviços de moderador Request for Single Stage - One 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de oficina sobre economia Quotations Envelope 23 30 31 Initiatives ation solidária. SUB 129 - 11 / Contratação Component 1: Sustainable de serviços de captação de Request for Single Stage - One 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled imagens das atividades do Quotations Envelope 23 30 30 Initiatives projeto na aldeia. SUB 142-15 / Serviços de edição de videos a partir Component 1: Sustainable Community 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-08- dos registros audiovisuais TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 15 29 05 09 16 15 realizados nas oficinas e na Initiatives Development festa de colheita do milho SUB 142 -2 / Contratação de apoio operacional para Component 1: Sustainable Community acompanhamento e 2018-01- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-02- 2019-05- 2018-02- 2019-06- 2018-03- 2020-02- TF / 18765 and Adaptive Community Post Driven Limited 3,764.56 Completed avaliação de oficinas e 23 14 06 16 15 25 18 28 23 11 26 20 Initiatives Development atividades do projeto e apoio à edição e registro de imagens captadas. SUB 98 -3 / Contratação de profissional técnico para Component 1: Sustainable Community elaboração do projeto do 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled viveiro para produção de 15 29 05 09 16 17 Initiatives Development 10.000 mudas/ano (nativas e frutíferas). SUB 105-16 / Contratação de agente local para Component 1: Sustainable Community Pending mobilização e 2018-05- 2018-05- 2018-05- 2018-05- 2018-06- 2020-01- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement acompanhamento das 10 13 23 28 03 24 Initiatives Development ation atividades do projeto na Comunidade Quilombola Carrapato. SUB 105-19 / Contratação Component 1: Sustainable Community Pending de agente local para 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-06- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement acompanhamento a 20 23 02 05 13 08 Initiatives Development ation Caravana Quilombola do Jalapão. SUB 105-17 / Contratação de agente local para Component 1: Sustainable Community Pending mobilização e 2018-05- 2018-05- 2018-05- 2018-06- 2018-06- 2020-01- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement acompanhamento das 10 13 23 04 09 30 Initiatives Development ation atividades do projeto na comunidade quilombola Barra do Aroeira. SUB 129 - 7 / Contratação de serviços com Component 1: Sustainable Pending Request for Single Stage - One 2018-07- 2018-08- 2018-10- acompanhamento da obra TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 30 29 do ateliê, nos moldes da Initiatives ation bioconstrução. SUB 105-4 / CQ105.4 Contratação de Agente Local Component 1: Sustainable Community comunitário para 2018-05- 2018-08- 2018-05- 2018-08- 2018-05- 2018-07- 2018-05- 2018-08- 2018-05- 2018-08- 2019-10- TF / 18765 and Adaptive Community Post Driven Limited 3,561.71 Signed mobilização e apoio nas 10 03 13 03 16 20 19 29 24 29 06 Initiatives Development atividades para Comunidade Quilombola Prada. SUB 105-18 / Contratação de agente local para Component 1: Sustainable Community Pending mobilização e 2018-05- 2018-05- 2018-06- 2018-07- 2018-08- 2019-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement acompanhamento das 10 13 24 24 28 24 Initiatives Development ation atividades do projeto na comunidade quilombola Boa Esperança. SUB 16-18 / Contratação Component 1: Sustainable Community de serviço de apoio 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- 2019-11- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled operacional para execução 15 20 30 04 08 29 Initiatives Development do projeto técnico subprojeto 16 SUB 42-17 / Serviços de serraria para construção de Component 1: Sustainable uma base de apoio para 2017-09- 2017-10- 2017-10- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled vigilância (barracão) em 22 06 24 02 Initiatives local estratégico na terra indígena krahô-kanela SUB 42-19 / Serviços de Component 1: Sustainable 2017-10- 2017-11- 2017-11- 2018-01- mão de obra 1 para TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 25 08 25 25 abertura de poço Initiatives SUB 42-20 / Serviços de Component 1: Sustainable 2017-10- 2017-11- 2017-11- 2018-01- mão de obra 2 para TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 25 08 25 25 abertura de poço Initiatives SUB 42-21 / Serviços de Component 1: Sustainable 2017-10- 2017-11- 2017-11- 2018-01- mão de obra 3 para TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 25 08 25 25 abertura de poço. Initiatives SUB 3-12 / Contratação de serviços de operador de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-12- máquina para oficina de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 27 03 14 capacitação de construção Initiatives de barraginhas. SUB 3-13 / Contratação de Component 1: Sustainable serviços de locação de Request for Single Stage - One 2017-10- 2017-11- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled caminhão para transporte Quotations Envelope 02 07 19 Initiatives de pá carregadeira. SUB 3-17 / Serviço de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- manutenção de pá TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 13 30 29 carregadeira. Initiatives SUB 16-15 / CQ16-15 Contratação de profissional Component 1: Sustainable Request for Single Stage - One 2017-06- 2017-08- 2017-11- para ministrar oficina para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 25 03 01 implantação de sistemas Initiatives agroflorestais SUB 16-22 / Contratação Component 1: Sustainable de profissional para realizar Request for Single Stage - One 2018-05- 2018-08- 2018-06- 2018-08- 2018-10- 2019-05- TF / 18765 and Adaptive Community Post Limited 1,980.00 Completed serviço de cercamento das Quotations Envelope 30 01 17 23 15 23 Initiatives nascentes. SUB 120-5 / Contratação de serviços para captação e edição de imagens para Component 1: Sustainable Pending produção de vídeo Request for Single Stage - One 2017-09- 2017-10- 2019-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement documentário sobre o Quotations Envelope 29 17 10 Initiatives ation movimento das Mulheres Yarang, no Território Indígena do Xingu. SUB 109-12 / CT109.12 Contratação de profissional para assessoramento da reforma e da planta da Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2018-04- agroindústria com os TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 16 03 gestores públicos Initiatives regulamentadores da legislação sanitária e Realizar treinamento boas praticas comercialização SUB 42-6 / Serviço de 01 pedreiro para realizar a Component 1: Sustainable adequação de barracão para Request for Single Stage - One 2017-09- 2018-07- 2017-10- 2018-08- 2017-11- 2018-12- TF / 18765 and Adaptive Community Post Limited 2,342.53 Completed servir de sede do projeto e Quotations Envelope 19 18 06 22 06 20 Initiatives para acondicionar equipamentos BR-CAA-39551-NC-RFQ / Contratação de serviços para realização de evento para cerca de 20 pessoas, Component 1: Sustainable em Montes Claros-MG: Request for Single Stage - One 2018-07- 2018-07- 2018-08- 2018-07- 2018-09- 2018-08- TF / 18765 and Adaptive Community Post Limited 5,943.86 Completed Oficina de Elaboração de Quotations Envelope 17 24 03 31 02 30 Initiatives Projetos, incluindo as etapas de hospedagem, alimentação e locação de espaço e equipamentos. BR-CAA-39552-NC-RFQ / Contratação de serviços para realização de evento para cerca de 20 pessoas, Component 1: Sustainable Pending em Brasília-DF: Oficina de Request for Single Stage - One 2018-07- 2018-08- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Elaboração de Projetos, Quotations Envelope 22 08 07 Initiatives ation incluindo as etapas de hospedagem, alimentação e locação de espaço e equipamentos. BR-CAA-39553-NC-RFQ / Contratação de serviços para realização de evento para cerca de 20 pessoas, Component 1: Sustainable em Cuiabá-MT: Oficina de Request for Single Stage - One 2018-07- 2018-08- 2018-08- 2018-08- 2018-09- 2018-09- TF / 18765 and Adaptive Community Post Limited 11,589.51 Completed Elaboração de Projetos, Quotations Envelope 27 02 13 14 12 28 Initiatives incluindo as etapas de hospedagem, alimentação e locação de espaço e equipamentos. BR-CAA-39554-NC-RFQ / Contratação de profissional especializado em Component 1: Sustainable Pending Educomunicação /midias Request for Single Stage - One 2018-07- 2018-08- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement sociais para sensibilização Quotations Envelope 17 03 02 Initiatives ation dos subprojetos na importância do uso do plano de comunicação. BR-CAA-39555-NC-RFQ / Contratação de serviços de projeto e produção gráfica Component 2: Capacity Pending Request for Single Stage - One 2018-07- 2018-08- 2018-09- de cartilha para divulgação TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 17 03 02 dos projetos, com entrega Strengthening ation de arquivos para publicação digital e para impressão. AI2 - 1 / Contratação de Component 1: Sustainable Community serviços de contabilidade 2018-08- 2018-10- 2018-08- 2018-10- 2018-09- 2018-11- 2018-09- 2018-11- 2018-09- 2018-11- 2019-09- 2019-02- TF / 18765 and Adaptive Community Post Driven Limited 3,655.28 Completed para realização de 20 30 25 30 04 01 06 14 13 26 08 08 Initiatives Development balancetes anuais da Rede Cerrado. Page 15 BR-CAA-39550-NC-RFQ / Contratação de serviços para fornecimento de alimentação (lanche, almoço Component 2: Capacity e jantar) para 4 Request for Single Stage - One 2018-09- 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- TF / 18765 Building and Institutional Post Limited 6,800.12 Completed capacitações, para público Quotations Envelope 10 12 30 11 29 10 Strengthening composto de sócios do CAA e membros dos subprojetos, a ser realizada em Montes Claros - Público total de 130 pessoas. BR-CAA-39556-NC-RFQ / Contratação de serviços de tabulação de dados das Component 2: Capacity Pending Request for Single Stage - One 2018-09- 2018-10- 2018-12- pesquisas realizadas TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 12 04 03 durante as visitas de Strengthening ation checagem dos subprojetos dos editais 1 e 2 (marco 0). SUB 100 -15 / Serviços de Component 1: Sustainable Pending diagramação e impressão de Request for Single Stage - One 2018-11- 2018-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement materiais de divulgação da Quotations Envelope 17 10 08 Initiatives ation cultura indígena chiquitano. SUB 100 -17 / Contratação de serviços de locação de Component 1: Sustainable Pending Request for Single Stage - One 2018-11- 2018-12- 2019-01- transporte - participantes TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 10 09 de intercâmbio e atividades Initiatives ation do projeto. SUB 125-29 / Contratação Component 1: Sustainable Pending de Empresa de Engenharia e Request for Single Stage - One 2018-12- 2018-12- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement obras para construção de Quotations Envelope 01 20 19 Initiatives ation unidade de beneficiamento SUB 127-21 / Servico de Component 1: Sustainable Pending empreita de mao de obra de Request for Single Stage - One 2017-12- 2018-01- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement pedreiro para construcao do Quotations Envelope 28 15 25 Initiatives ation centro SUB 75-11 / Contratação de serviços de pedreiro para Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2019-01- 2019-07- construção do Centro de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 26 25 Turismo Sustentável, para Initiatives ation os Festejos Kalungas. AI3 - 2 / Contratação de serviço transporte de duas vans da regional Pará até Component 1: Sustainable Community Pending 2019-01- 2019-01- 2019-01- 2019-01- 2019-02- 2019-03- São Domingos do Araguaia, TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 21 23 30 31 03 05 para participar do VIII Initiatives Development ation Encontrão das Quebradeiras de Coco Babaçu AI3 - 3 / Contratação de serviço transporte de ônibus para deslocamento das mulheres da regional Component 1: Sustainable Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-02- 2019-03- 2019-02- Imperatiz até São Domingos TF / 18765 and Adaptive Community Post Limited 3,169.34 Completed Quotations Envelope 23 01 03 05 05 12 do Araguaia - PA, para Initiatives participar do VIII Encontrão das Quebradeiras de Coco Babaçu AI3- 4 / Contratação de serviço transporte de ônibus para deslocamento das mulheres da regional Component 1: Sustainable Pending Request for Single Stage - One 2019-01- 2019-02- 2019-03- Tocantins até São Domingos TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 03 05 do Araguaia - PA, para Initiatives ation participar do VIII Encontrão das Quebradeiras de Coco Babaçu AI3 - 6 / Contratação de serviço transporte de ônibus para deslocamento das mulheres das regionais Component 1: Sustainable Pending Request for Single Stage - One 2019-01- 2019-02- 2019-03- Baixada e Mearim Tocantins TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 03 05 até São Domingos do Initiatives ation Araguaia - PA, para participar do VIII Encontrão das Quebradeiras de Coco Babaçu AI3 - 7 / Contratação de serviço transporte de ônibus para deslocamento das Component 1: Sustainable mulheres da regional Piauí Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-02- 2019-03- 2019-02- TF / 18765 and Adaptive Community Post Limited 1,804.30 Completed até São Domingos do Quotations Envelope 23 01 03 04 05 12 Initiatives Araguaia - PA, para participar do VIII Encontrão das Quebradeiras de Coco Babaçu AI3 - 3 / Contratação de serviços audiovisuais pessoa Component 1: Sustainable Community 2018-03- 2018-03- 2018-04- 2018-04- 2018-04- 2018-07- física para produção de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 14 28 04 09 16 16 filmes, fotografias, áudio, Initiatives Development entre outras atividades. BR-CAA-39560-NC-RFQ / Contratação de serviços de transporte para realização Component 2: Capacity Under de traslado - aeroporto- Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- TF / 18765 Building and Institutional Post Limited 0.00 Implement rodoviária/hotel/aeroporto- Quotations Envelope 26 06 09 11 Strengthening ation rodoviária e dia de campo, durante participação de curso a ser realizado em Brasília/DF BR-CAA-39561-NC-RFQ / Component 2: Capacity Pending Contratação de serviços Request for Single Stage - One 2019-01- 2019-02- 2019-03- TF / 18765 Building and Institutional Post Limited 0.00 Implement para impressão de agendas Quotations Envelope 26 09 26 Strengthening ation personalizadas. BR-CAA-39562-NC-RFQ / Contratação de empresa especializada, para Component 3: Project Request for Single Stage - One 2019-02- 2019-04- 2019-03- 2019-04- 2020-12- realização de auditoria TF / 18765 Management, Monitoring Post Limited 12,739.29 Signed Quotations Envelope 07 04 07 26 16 externa na documentação and Evaluation relativa ao projeto, nos exercícios de 2018, 2019 e 2020. SUB 16-6 / CQ16-6 Serviços de moderação e Component 1: Sustainable instrução de instrutor da 2017-06- 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled comunidade para ministrar 19 09 23 06 Initiatives a oficina de Conhecimentos de Plantas Medicinais do Cerrado SUB 26-13 / CT26.13 Component 1: Sustainable 2017-08- 2017-08- 2017-09- 2017-11- Contratacao de serviço geral TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 18 23 15 14 de viveirista por diarias Initiatives SUB 26-14 / CT26.14 Component 1: Sustainable 2017-11- 2017-11- 2017-12- 2018-02- Contratacao de servico de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 27 20 18 pedreiro por diaria Initiatives SUB 110-19 / Serviços gráficos de impressão de Component 1: Sustainable Pending material didático para as Request for Single Stage - One 2017-08- 2017-08- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement oficinas de capacitação em Quotations Envelope 02 24 21 Initiatives ation Recuperação Ambiental e Agroecologia. + Banner SUB 110-20 / CQ110.20 Contratação de serviços gerais, por diária, para Component 1: Sustainable 2017-07- 2017-08- 2017-08- 2017-11- cercamento da área critica TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 26 05 14 12 para fins de regeneração Initiatives natural manejo agroflorestal agroecológico SUB 110-21 / CQ110.21 Contratação de serviços Component 1: Sustainable gerais, por diária, de 2017-11- 2017-11- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled pedreiro para construção do 20 30 11 30 Initiatives viveiro e sala de armazenamento de sementes SUB 110-22 / CQ110.22 Contratação de serviços Component 1: Sustainable gerais, por diária, para 2017-07- 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled implantação de paliçadas 26 05 15 24 Initiatives para barreiras de contenção em voçorocas SUB 110-24 / CQ110.24 Contratação de serviços gerais, por diária, de Component 1: Sustainable 2017-07- 2017-08- 2017-08- 2019-04- cozinheira para oficinas de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 27 06 23 15 capacitação, reuniões Initiatives mensais organizativas e de monitoramento SUB 268 SC 6 / Contratação de oficineiro para realização Component 1: Sustainable Pending Request for Single Stage - One 2019-02- 2019-03- 2019-06- de 3 oficinas de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 15 05 04 aperfeiçoamento do Initiatives ation artesanato produzido SUB 268 SC 07 / Component 1: Sustainable Pending Request for Single Stage - One 2019-02- 2019-03- 2019-06- Contratação de profissional TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 09 08 para construção de web site Initiatives ation SUB 173 SC 004 / Contratação de serviços de Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-09- 2019-03- 2019-10- 2020-01- pedreiro comunitário para TF / 18765 and Adaptive Community Post Limited 3,822.67 Signed Quotations Envelope 19 30 09 09 04 execução da obra de Initiatives unidade de beneficiamento SUB 218 SC 002 / Aluguel de micro-ônibus/ônibus Component 1: Sustainable Pending Request for Single Stage - One 2019-02- 2019-03- 2020-01- para transporte dos TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 16 06 01 participantes dos mutirões Initiatives ation de resgate das tradições SUB 166 SC 001 / Component 1: Sustainable Contratação de empresa Request for Single Stage - One 2019-02- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para realização de obra da Quotations Envelope 19 09 09 Initiatives cozinha para processamento SUB 45-7 / CT45.7 Component 1: Sustainable Request for Single Stage - One 2017-06- 2017-07- 2017-09- Contratacao de servicos de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 17 15 pedreiros Initiatives SUB 45-9 / CT45.9 Contratacao de servico de Component 1: Sustainable moderacao e instrutoria Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para curso sobre Quotations Envelope 04 28 06 Initiatives planejamento participativo e gestao compartilhada SUB 45-12 / CT45.12 Contratacao de servico de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-11- moderacao e instrutoria TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 27 26 10 para uma oficina de gestao Initiatives financeira SUB 45-14 / CT45.14 Contratacao de servico de Component 1: Sustainable moderacao e instrutoria Request for Single Stage - One 2018-04- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para curso de prevencao de Quotations Envelope 22 28 12 Initiatives acidentes com animais peconhentos SUB 45-15 / CT45.15 Contratacao de servico de Component 1: Sustainable moderacao e instrutoria Request for Single Stage - One 2018-08- 2018-09- 2018-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para curso sobre manejo Quotations Envelope 13 17 01 Initiatives adequado e conservacao dos recursos naturais SUB 45-23 / CT45.23 Contratacao de um profissional tecnico com Component 1: Sustainable experiencia na area Request for Single Stage - One 2017-06- 2017-07- 2019-03- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled agropecuaria vivencia em Quotations Envelope 25 19 11 Initiatives trabalhos com grupos de mulheres e que vem atuando na area da agricultura famíliar SUB 45-13 / CT45.13 Contratacao de servico de Component 1: Sustainable moderacao e instrutoria Request for Single Stage - One 2018-02- 2018-03- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para curso sobre boas Quotations Envelope 10 13 27 Initiatives praticas na manipulacao do azeite de coco SUB 55-11 / 55.11 Contratacao de servicos de Component 1: Sustainable Pending Request for Single Stage - One 2019-03- 2019-03- 2019-06- impressão de rótulos e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 22 30 aquisição de um Datador Initiatives ation Automático. SUB 211 SC 004 / Contratação de serviços de Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-10- 2019-03- 2019-10- 2019-04- pedreiro para construção, TF / 18765 and Adaptive Community Post Limited 1,689.50 Signed Quotations Envelope 23 03 13 11 13 instalação elétrica e Initiatives hidráulica da Casa de Cultura SUB 211 SC 005 / Contratação de serviços de Component 1: Sustainable mão-de-obra para estrutura Request for Single Stage - One 2019-02- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled em madeira e cobertura em Quotations Envelope 23 13 13 Initiatives palha e piaçava para construção da Casa de Cultura SUB 179 SC 004 / Component 1: Sustainable Under Contratação de serviços Request for Single Stage - One 2019-02- 2020-09- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 2,639.19 Implement para instalação do poço Quotations Envelope 23 17 13 13 Initiatives ation artesiano com placas de energia solar. BR-CAA-39559-NC-RFQ / Contratação de profissional para apoio junto as equipes de licitação e financeira das atividades físico-financeira Component 2: Capacity para implementação dos Request for Single Stage - One 2019-01- 2019-04- 2019-02- 2019-05- 2020-02- 2020-12- TF / 18765 Building and Institutional Post Limited 11,508.58 Completed cursos e Quotations Envelope 26 03 15 02 10 17 Strengthening Organização e acompanhamento logístico para implementação de cada curso, previstos no Plano de Capacitação. SUB 90-1 / CT90.1 Contratação de servicos de Component 1: Sustainable Pending rotulagem técnica Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement obrigatória com Quotations Envelope 08 31 09 Initiatives ation levantamento e analise nutricional dos componentes dos produtos SUB 61-14 / CQ61.14 Contratação de serviço de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-10- instancio de dez TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 04 04 computadores adquiridos Initiatives para o tele centro SUB 61-19 / CQ61.19 Contratação de profissional técnico para realizar Component 1: Sustainable Request for Single Stage - One 2018-01- 2018-02- 2018-04- capacitação sobre a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 17 12 03 participação dos jovens na Initiatives produção de mídias em redes sociais SUB 109-2 / CT109.2 Contratação de serviços de agente de comercialização para garantir o acesso ao Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2018-11- mercado local com a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 29 21 15 realização de levantamentos Initiatives acordos com mercados elaboração de projetos de venda e acompanhamento SUB 108- 29 / Contratação Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-11- 2019-03- 2019-11- 2020-08- 2020-06- de Empresa de Engenharia TF / 18765 and Adaptive Community Post Limited 11,649.37 Completed Quotations Envelope 04 11 20 26 01 23 para construção de Initiatives beneficiamento SUB 108-5 / Contratação Component 1: Sustainable de serviços para confecção Request for Single Stage - One 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de banners e folders para Quotations Envelope 12 29 29 Initiatives divulgação/informativo SUB 113-1 / Contratação Component 1: Sustainable de agente da comunidade 2017-09- 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled para Capacitação de grupos 01 22 24 26 Initiatives produtivos. SUB 113-3 / serviço de mobilização comunitária junto às famílias envolvidas no projeto para realizar a Component 1: Sustainable produção local e Request for Single Stage - One 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled identificação de mudas Quotations Envelope 08 25 24 Initiatives nativas a serem adquiridas para restauração de áreas degradadas, no âmbito das nascentes do córrego fazendinha. SUB 250-6 / Contratação Component 1: Sustainable Pending de serviços de impressão Request for Single Stage - One 2019-02- 2019-03- 2019-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement dos rótulos, livretos de Quotations Envelope 26 18 17 Initiatives ation receita e folders. SUB 113-7 / Contratação Component 1: Sustainable Under Request for Single Stage - One 2017-09- 2019-08- 2017-09- 2018-12- de serviços de locação de TF / 18765 and Adaptive Community Post Limited 857.28 Implement Quotations Envelope 12 30 29 24 veículo Initiatives ation Page 16 SUB 113- 25 / Contratação Component 1: Sustainable Pending de serviços de locação de Request for Single Stage - One 2019-03- 2019-03- 2020-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement transporte para eventos Quotations Envelope 17 28 20 Initiatives ation regionais ( 4.000,00). SUB 113- 26 / . Contratação de serviços de Component 1: Sustainable Pending Request for Single Stage - One 2019-03- 2019-03- 2020-06- locação de veículo durante 3 TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 28 20 meses para realização dos Initiatives ation trabalhos previstos (5.400,00). SUB 113-20 / SUB 113-20 Component 1: Sustainable Community serviço de apoio operacional 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled para execução das 15 22 05 12 19 25 Initiatives Development atividades subprojeto CTA. Component 1: Sustainable 71- 12 / Serviços de Arte Request for Single Stage - One 2019-03- 2019-09- 2019-03- 2019-09- 2019-04- 2020-03- TF / 18765 and Adaptive Community Post Limited 1,174.90 Completed Gráfico (Design) Quotations Envelope 08 18 23 27 22 19 Initiatives BR-CAA-103028-NC-RFQ / Serviços gráficos para Component 2: Capacity Request for Single Stage - One 2019-03- 2019-03- 2019-04- 2019-03- 2019-06- 2019-05- confecção dos materiais TF / 18765 Building and Institutional Post Limited 867.37 Completed Quotations Envelope 18 06 12 28 11 27 pedagógicos para as Strengthening oficinas do plano de capacitação SUB 124 - 3 / Contratação Component 1: Sustainable Community 2018-01- 2019-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- de serviços para confecção TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 22 11 05 12 14 20 23 de camisetas Initiatives Development personalizadas. SUB 124 - 2 / Serviço de movimento de terra com Component 1: Sustainable Community 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- trator ou terraplenagem TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 22 05 12 14 20 23 para viabilizar a construção Initiatives Development de barragens. SUB 91-1 / Serviço de mão Component 1: Sustainable Community de obra (civil, hidráulico e 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled elétrico) para montagem do 15 29 05 09 15 17 Initiatives Development sistema de bombeamento SUB 71-7 / CT71.7 Contratação de profissional para elaboração do Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2018-02- Regimento Interno das TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 23 17 24 Casas do Coco e elaboração Initiatives do manual de boas praticas para os produtos do coco SUB 71-3 / CT71.3 Contratação de profissional Component 1: Sustainable para estruturação do plano Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de negócios que contenha o Quotations Envelope 20 16 25 Initiatives desenvolvimento de logística de venda e distribuição BR-CAA-105071-NC-RFQ / Contratação de prestação de serviços de tradução de Component 3: Project textos (em português para o Request for Single Stage - One 2019-03- 2019-08- 2019-04- 2019-09- 2019-07- TF / 18765 Management, Monitoring Post Limited 2,061.90 Signed idioma inglês, e do inglês Quotations Envelope 20 09 08 06 07 and Evaluation para o idioma português) para produção de publicação do projeto DGM/FIP/Brasil SUB 210- 6 / Contratação de serviços para capacitação Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-06- em construção de viveiro TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 17 25 23 para produção de mudas e Initiatives implantação dos quintais SUB 124 - 4 / Contratação Component 1: Sustainable Community de serviços de alimentação 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled para participantes do dia de 26 09 19 20 26 30 Initiatives Development campo, durante curso de SAF. SUB 124 - 10 / Aluguel de implementos agrícolas (Aluguel de trator equipado com carreta para transporte, Component 1: Sustainable tanque de água com bomba, Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-09- 2019-10- TF / 18765 and Adaptive Community Post Limited 7,273.25 Completed container d'água, susolador Quotations Envelope 22 02 11 15 08 15 Initiatives e esteira rotativa para preparo de linhas de plantio , plantio e irrigação - instalação dos SAFs) SUB 124 - 12 / Contratação de profissional em Educação Component 1: Sustainable Ambiental para condução de Request for Single Stage - One 2019-05- 2019-10- 2019-05- 2019-10- 2019-07- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,946.50 Completed oficinas participativas para Quotations Envelope 07 16 30 25 29 06 Initiatives levantamento de dados com os atores do projeto. BR-CAA-110425-NC-RFQ / Contratação de serviço para fornecimento de alimentação (lanche, almoço e jantar) para 02 (duas) Component 2: Capacity Pending Request for Single Stage - One 2019-04- 2019-05- 2019-10- capacitações (Mudanças TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 29 16 13 climáticas e a política de Strengthening ation REDD+ E Agroindústria), para público de 75 participantes a serem realizados em Montes Claros/MG. SUB 124 - 13 / Contratação de profissional para Component 1: Sustainable Pending ministrar capacitação Request for Single Stage - One 2019-05- 2019-06- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement teórico/pratico sobre Quotations Envelope 10 04 03 Initiatives ation produtos e comercio de produtos obtidos através da mandioca. BR-CAA-110426-NC-DIR / Serviço do Facebook ADS para impulsionamento da Component 2: Capacity Pending 2019-04- 2019-04- 2019-05- 2020-04- página através das TF / 18765 Building and Institutional Post Direct Selection Direct 0.00 Implement 22 29 12 06 publicações, especificando o Strengthening ation público de interesse do projeto DGM e Subprojetos BR-CAA-110427-NC-DIR / Serviço Do Instagram ADS para impulsionamento da Component 2: Capacity Pending 2019-04- 2019-04- 2019-05- 2020-04- página e posts através do TF / 18765 Building and Institutional Post Direct Selection Direct 0.00 Implement 22 29 12 06 Instagram objetivando Strengthening ation atingir o público do projeto DGM e Subprojetos SUB 124 - 14 / Contratação Component 1: Sustainable Under Request for Single Stage - One 2019-05- 2020-02- 2019-06- 2019-08- de serviços de impressão de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 21 08 07 cartilhas Initiatives ation BR-CAA-110428-NC-DIR / Contratação de licença de uso da ferramenta de envio Component 2: Capacity de e-mail em massa, design 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2020-04- TF / 18765 Building and Institutional Post Direct Selection Direct 1,059.93 Signed de newsletter e mailing 22 22 29 13 12 13 06 Strengthening jornalístico objetivando atingir o público do projeto DGM e Subprojetos BR-CAA-110431-NC-RFQ / Contratação de serviços de hospedagem e translado Component 2: Capacity para participantes dos Request for Single Stage - One 2019-05- 2019-05- 2019-05- 2019-05- 2019-08- 2019-08- TF / 18765 Building and Institutional Post Limited 20,407.69 Completed módulos I e II do Curso de Quotations Envelope 09 23 24 31 22 15 Strengthening Sustentabilidade e Indidência política (30 participantes - Brasília, DF). BR-CAA-110432-NC-RFQ / Contratação de serviços de transporte para 35 pessoas, Component 2: Capacity Request for Single Stage - One 2019-06- 2019-07- 2019-06- 2019-07- 2019-07- 2019-07- para deslocamento dos TF / 18765 Building and Institutional Post Limited 149.90 Completed Quotations Envelope 03 10 28 23 28 29 participantes no Curso de Strengthening REDD - percurso Montes Claros a AEFA (local do curso). SUB 218 SC 004 / Contratação de serviços Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-06- 2019-03- 2019-07- 2019-05- 2019-09- para produção de sacolas TF / 18765 and Adaptive Community Post Limited 1,465.27 Completed Quotations Envelope 19 28 10 29 09 20 de papel e caixas de Initiatives papelão personalizadas. SUB 241-3 / Contratação de horas-máquina para Component 1: Sustainable Pending Request for Single Stage - One 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-09- implantação de tecnologias TF / 18765 and Adaptive Community Post Limited 0.00 Implement Proposals Envelope 17 25 05 09 13 12 de barramento de água Initiatives ation (barraginha) SUB 216-2 / Serviços de impressão de documento Component 1: Sustainable Request for Single Stage - One 2019-06- 2019-07- 2019-10- base com os diagnósticos TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 26 19 18 para construção dos planos Initiatives de gestão territorial e ambiental SUB 179 SC 001 / Component 1: Sustainable Contratação de serviços Request for Single Stage - One 2019-02- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para: perfuração E Quotations Envelope 19 09 09 Initiatives revestimento de poço artesiano BR-CAA-105072-NC-RFQ / Contratação de serviços de Component 2: Capacity transporte para Request for Single Stage - One 2019-07- 2019-08- 2019-09- 2019-08- 2019-11- 2019-08- TF / 18765 Building and Institutional Post Limited 168.74 Completed deslocamento durante Quotations Envelope 31 08 25 16 19 30 Strengthening reunião dos membros do CGN em Montes Claros no mês de Agosto. BR-CAA-105074-NC-RFQ / Contratação de Component 2: Capacity Hospedagem para o Request for Single Stage - One 2019-08- 2019-09- 2019-08- 2019-09- 2019-09- 2019-10- TF / 18765 Building and Institutional Post Limited 2,984.86 Completed Colóquio Internacional de Quotations Envelope 14 10 31 19 30 21 Strengthening PICTs/ Oficina de Turismo de Base Comunitária em Montes Claros. BR-CAA-127223-NC-RFQ / Serviços de hospedagens e Component 2: Capacity transfer para os Request for Single Stage - One 2019-09- 2019-09- 2019-09- 2019-10- 2019-12- 2019-12- TF / 18765 Building and Institutional Post Limited 10,996.84 Completed participantes do 3º e 4º Quotations Envelope 04 20 11 01 11 20 Strengthening módulo do cursos de Sustentabilidade em  parceria com a Unb. BR-CAA-127227-NC-RFQ / Serviço de buffer/alimentação para os Component 2: Capacity Request for Single Stage - One 2019-09- 2019-09- 2019-09- 2019-10- 2019-12- 2019-12- cursos a serem realizadas TF / 18765 Building and Institutional Post Limited 15,380.55 Completed Quotations Envelope 04 20 11 01 10 06 na AEFA = Energia Strengthening fotovoltaica ( 30 participantes) + Produção Agroecológica (35 participantes) BR-CAA-105073-NC-RFQ / Contratação de profissional para apoio junto a equipe Component 3: Project financeira para lançamentos Request for Single Stage - One 2019-07- 2019-09- 2019-11- TF / 18765 Management, Monitoring Post Limited 0.00 Canceled e correções no sistema de Quotations Envelope 31 25 29 and Evaluation gestão, referente receitas e despesas dos anos 2015- 2018 BR-CAA-129374-NC-RFQ / Contratação de pessoa física para prestação de serviços de Contratação de pessoa Component 2: Capacity física para prestação de Request for Single Stage - One 2019-09- 2019-09- 2019-12- TF / 18765 Building and Institutional Post Limited 0.00 Canceled serviços de criação, Quotations Envelope 09 26 25 Strengthening concepção, produção musical, gravação, mixagem, masterização de trilha sonora vídeo musical do DGM/FIP/Brasil. BR-CAA-129375-NC-RFQ / Contratação de serviços especializados de fotografia em câmera profissional full frame, com Component 2: Capacity Request for Single Stage - One 2019-09- 2019-11- 2019-09- 2019-11- 2019-12- resolução acima de 22.3 TF / 18765 Building and Institutional Post Limited 1,434.60 Signed Quotations Envelope 09 07 26 27 25 megapixels, para produção Strengthening de acervo fotográfico do Projeto DGM FIP Brasil, para uso institucional do CAA, BM e Subprojetos. BR-CAA-133682-NC-RFQ / Contratação de serviços de transporte para deslocamento dos Component 2: Capacity Request for Single Stage - One 2019-09- 2019-11- 2019-10- 2019-11- 2019-10- 2020-04- participantes do Curso de TF / 18765 Building and Institutional Post Limited 1,234.67 Completed Quotations Envelope 23 11 09 14 18 01 Formação e Agroecologia Strengthening (Módulos I e II) e Capacitação em energia fotovoltaica, a ser realizados em Montes Claros - 2º semestre de 2019 Component 1: Sustainable SUB 218 -SC 008-2019 / Request for Single Stage - One 2019-08- 2019-10- 2019-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Cardagem algodão orgânico Quotations Envelope 27 14 15 Initiatives SUB 218 -CD 002.2019 / Component 1: Sustainable Under 2019-09- 2019-08- 2019-09- 2019-08- 2019-10- 2019-11- Cardagem do algodão TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 23 28 26 28 02 02 orgânico Initiatives ation BR-CAA-110430-NC-RFQ / Serviço de comunicação com foco em ministrar oficinas quanto ao direito a Component 2: Capacity Request for Single Stage - One 2019-05- 2019-05- 2019-08- comunicação e a nova visão TF / 18765 Building and Institutional Post Limited 0.00 Canceled Quotations Envelope 06 23 21 de fotografar, filmar, Strengthening escrever, entrevistar e contar histórias visando a comunicação popular SUB 169-3 / Confecção de placa de inauguração do Component 1: Sustainable Request for Single Stage - One 2019-11- 2020-07- 2019-12- 2020-07- 2019-12- 2020-08- centro e placas TF / 18765 and Adaptive Community Post Limited 195.08 Completed Quotations Envelope 17 08 06 24 12 06 sinalizadores dos pontos Initiatives turísticos da região do Delta do Parnaíba. SUB 169-4 / Contratação de serviços gráficos: Component 1: Sustainable Pending sinalização dos pontos; Request for Single Stage - One 2019-11- 2019-12- 2020-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement produção de identidade; e Quotations Envelope 17 06 04 Initiatives ation impressão de cartazes da associações e do projeto. SUB 85 - 3 / Serviço de Component 1: Sustainable Community 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-05- mão de obra para TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 08 22 29 02 09 21 construção de cercas - Mão Initiatives Development Obra 1 SUB 85 - 4 / Serviço de Component 1: Sustainable Community 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-05- mão de obra para TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 08 22 29 02 09 21 construção de cercas - Mão Initiatives Development Obra 2. Component 1: Sustainable Community SUB 85 - 2 / Serviço de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled locação de micro-ônibus. 26 09 16 18 27 28 Initiatives Development Component 1: Sustainable Community SUB 85 - 5 / Serviço de 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-06- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled aragem de terra com trator. 29 12 19 23 02 10 Initiatives Development SUB 85 - 6 / Serviço de Component 1: Sustainable Community 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- Instalação de sistema de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 26 09 18 20 26 26 irrigação. Initiatives Development SUB 16-19 / Contratação de serviço de apoio Component 1: Sustainable Community 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- 2019-11- operacional de comunicação TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 15 20 30 02 06 27 para execução das Initiatives Development atividades subprojeto CEDRO. SUB 16-20 / Contratação de Agente Local para Component 1: Sustainable Community mobilização, 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-09- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled acompanhamento e apoio 25 30 09 11 21 14 Initiatives Development no planejamento das atividades do projeto. SUB 16-21 / Contratação de agente local para registros fotográficos e Component 1: Sustainable Community 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2019-09- organização das atividades TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 09 14 24 26 06 29 previstas no projeto (como Initiatives Development oficinas, seminários, construção, cercamento das nascentes). SUB 16-4 / CQ16-4 Serviço Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2019-01- de elaboração de vídeo TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 20 13 31 sobre as ações do projeto. Initiatives SUB 16-7 / CQ16-7 Serviço de preparo do solo para a Implantar uma Produção Component 1: Sustainable agroecológica Sustentável e 2017-08- 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled dezesseis ortas famílias 10 20 13 13 Initiatives objetivando fortalecer a soberania e a segurança alimentar na comunidade SUB 16-9 / CQ16-9 Serviço de hora maquina para a Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-12- construção de curvas de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 24 08 nível e bacias de contenção Initiatives de enxurrada SUB 3-20 / Contratação de serviços de máquina (trator) Component 1: Sustainable Pending com motorista para Request for Single Stage - One 2018-05- 2018-06- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção de barraginhas, Quotations Envelope 28 14 12 Initiatives ation para captação de água da chuva, na TI Maraiwatsede. Page 17 SUB 3-11 / Contratação de profissional para ministrar Oficina de práticas agroecológicas para Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-11- restauração do cerrado na TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 18 22 24 Aldeia A'opa com a Initiatives participação das aldeias Maraiwatsede, Etewawe e Madmabdze. SUB 3-14 / Contratação de Component 1: Sustainable serviços de pedreiro para Request for Single Stage - One 2017-09- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled construção de galpão em Quotations Envelope 29 06 05 Initiatives madeira e alvenaria - 100 dias SUB 3-19 / Contratação de serviços de tratoristas para Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-01- plantio de mudas e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 12 04 08 27 sementes no entorno das Initiatives aldeias Etewawê - Maraiwatsede SUB 3-21 / Contratação de serviços de operador de Component 1: Sustainable Pending Request for Single Stage - One 2019-10- 2019-11- 2020-01- máquina para oficina de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 05 04 capacitação de construção Initiatives ation de barraginhas. SUB 3-22 / Contratação de serviços de tratoristas para Component 1: Sustainable Pending plantio de mudas e Request for Single Stage - One 2019-10- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement sementes e plantio de 1000 Quotations Envelope 18 05 04 Initiatives ation mudas no entorno das aldeias Aopá - Madzabdze SUB 98 -2 / Serviço de Locação de uma Van para Component 1: Sustainable Community transportar representantes 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled indígenas, para a realização 15 29 05 09 15 17 Initiatives Development de um intercâmbio no municipio de Taquaral. SUB 98 -20 / Contratação de profissional técnico para Component 1: Sustainable Pending elaboração do projeto do Request for Single Stage - One 2019-10- 2019-11- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement viveiro para produção de Quotations Envelope 25 10 25 Initiatives ation 10.000 mudas/ano (nativas e frutíferas) AI - 3 / Serviço de confecção de kits Component 1: Sustainable Request for Single Stage - One 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- pedagógicos como TF / 18765 and Adaptive Community Post Limited 1,537.41 Completed Quotations Envelope 15 18 22 25 06 29 camisetas, bolsas e bloco de Initiatives anotações para utilização durante Assembleia AI - 4 / Serviços de fornecimento de refeição / Component 1: Sustainable Request for Single Stage - One 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- buffer para atividade de TF / 18765 and Adaptive Community Post Limited 6,662.11 Completed Quotations Envelope 14 18 21 22 05 04 assembleia da Wyty Cati Initiatives junto aos povos Timbiras SUB 127-16 / Servico de frete comunitario indigena Component 1: Sustainable para transporte de madeira Request for Single Stage - One 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e palhas que serao Quotations Envelope 12 26 25 Initiatives utilizadas na construcao do Centro de Revitalizacao - frete 2 SUB 30 - 1 / Serviço de Component 1: Sustainable Request for Single Stage - One 2017-12- 2017-12- 2018-12- confecção de Banners, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 12 29 15 Folders para divulgação do Initiatives subprojeto SUB 30 - 10 / Serviço de Component 1: Sustainable mão de obra para retirada 2017-09- 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled da madeira para Construção 22 06 23 23 Initiatives do viveiro. SUB 30 - 3 / Serviço de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- moderador para o encontro TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 25 25 de mulheres Initiatives SUB 30 - 5 / Serviço de Component 1: Sustainable cozinheira para Capacitação 2017-09- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled na área de elaboração de 27 11 31 30 Initiatives projetos. SUB 30 - 6 / Serviço de Component 1: Sustainable cozinheira para Capacitação 2017-09- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled na área de gestão 27 11 28 27 Initiatives administrativa e financeira. SUB 30 - 7 / Serviço de cozinheira para Encontro de Component 1: Sustainable mulheres indígenas bakairi 2017-09- 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled para discussão da gestão 20 04 21 21 Initiatives ambiental e territorial do povo bakairi realizado. SUB 30 - 8 / Serviço de Component 1: Sustainable mão de obra (civil, 2017-09- 2017-10- 2017-11- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled hidráulico e elétrico) para a 25 09 25 25 Initiatives construção do viveiro. SUB 30 - 9 / Serviço de Component 1: Sustainable mão de obra para retirada 2017-09- 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled da madeira para Construção 22 06 23 23 Initiatives do escritório do projeto. SUB 30 -4 / Serviço de Component 1: Sustainable cozinheira para Capacitação 2017-09- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled em gestão e legislação 27 11 28 27 Initiatives ambiental para 40 pessoas. SUB 139-1 / Confecção de Component 1: Sustainable Pending banners e impressão de Request for Single Stage - One 2019-11- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement cartilhas para divulgar Quotations Envelope 15 25 24 Initiatives ation atividades e ações do projeto SUB 218 - 9 / Contratação Component 1: Sustainable de serviços para produção Request for Single Stage - One 2019-11- 2019-11- 2019-11- 2019-11- 2020-01- 2019-11- TF / 18765 and Adaptive Community Post Limited 140.74 Completed de folders, banners Quotations Envelope 08 18 21 23 20 29 Initiatives personalizadas. SUB 74-76 / SUB 74-76 Component 1: Sustainable Community Serviço de apoio operacional 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled para execução das 11 19 26 29 02 24 Initiatives Development atividades subprojeto Wyty Cati. SUB 74-30 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 14 SUB 74-31 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 15 SUB 74-32 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 16 SUB 74-33 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 17 SUB 74-34 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 18 SUB 74-35 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 19 SUB 74-36 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 20 SUB 74-37 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 21 SUB 74-38 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 22 SUB 74-39 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 23 SUB 74-40 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 24 SUB 74-41 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 25 SUB 74-42 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 26 SUB 74-43 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 27 SUB 74-1 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 28 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 1 SUB 74-10 / Contratação Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-10- de serviços de impressão de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 18 18 cartazes e panfletos Initiatives SUB 74-16 / Contratação Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- de serviço de confecção de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 22 21 blusas com logo Initiatives SUB 74-18 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 2 SUB 74-19 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 3 SUB 74-2 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 27 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 01 SUB 74-20 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 4 SUB 74-21 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 5 SUB 74-22 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 6 SUB 74-23 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 7 SUB 74-24 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 8 SUB 74-25 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 9 SUB 74-26 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 10 SUB 74-27 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 11 SUB 74-28 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 12 Page 18 SUB 74-29 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 13 SUB 74-47 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 02 SUB 74-48 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 03 SUB 74-49 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 04 SUB 74-5 / Contratação de Component 1: Sustainable indígena facilitador na 2017-07- 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled Oficina de Monitoramento e 25 02 16 16 Initiatives fiscalização do território SUB 74-50 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-02- 2018-08- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 04 13 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 05 SUB 74-51 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 06 SUB 74-52 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 07 SUB 74-53 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 08 SUB 74-54 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 09 SUB 74-55 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 10 SUB 74-56 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 11 SUB 74-57 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 12 SUB 74-58 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 13 SUB 74-59 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 14 SUB 74-6 / Contratação de Component 1: Sustainable indígena facilitador na 2017-09- 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled Oficina de Monitoramento e 01 09 23 23 Initiatives fiscalização do território SUB 74-60 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 15 SUB 74-61 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 16 SUB 74-62 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 17 SUB 74-63 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 18 SUB 74-64 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 19 SUB 74-65 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 20 SUB 74-66 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 21 SUB 74-67 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 22 SUB 74-68 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 23 SUB 74-69 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 24 Component 1: Sustainable SUB 74-7 / Contratação de 2017-07- 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled cozinheiro (a) 25 02 16 16 Initiatives SUB 74-70 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 25 SUB 74-71 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-11- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 25 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 26 SUB 74-72 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 27 SUB 74-73 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 28 SUB 74-74 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 29 SUB 74-75 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 30 Component 1: Sustainable SUB 74-8 / Contratação de 2017-07- 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled cozinheiro (a) 25 02 16 16 Initiatives SUB 74-9 / Contratação de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-10- serviço de fornecimento de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 02 16 16 combustível Initiatives SUB 47-1 / Contratação de Component 1: Sustainable mão-de-obra de pedreiro Request for Single Stage - One 2017-10- 2017-11- 2018-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para reforma da unidade de Quotations Envelope 04 13 01 Initiatives beneficiamento de polpas. SUB 47-2 / Contratação de mão-de-obra de auxiliar de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-11- 2018-06- pedreiro para reforma da TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 13 01 unidade de beneficiamento Initiatives de polpas. SUB 173 - 14 / Contratação de serviços de ajudante de Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-12- 2020-02- pedreiro para etapa de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 05 03 finalização da cozinha Initiatives ation comunitária SUB 173 - 15 / Aluguel de Component 1: Sustainable ônibus para transporte dos Request for Single Stage - One 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- TF / 18765 and Adaptive Community Post Limited 835.73 Signed participantes do Quotations Envelope 08 06 20 11 20 Initiatives intercâmbio e seminário SUB 74-77 / Contratação Component 1: Sustainable serviços de locação de Request for Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- TF / 18765 and Adaptive Community Post Limited 763.30 Signed veículo Modelo 4x4 para Quotations Envelope 22 29 03 09 02 Initiatives expedição na TI Porquinhos. SUB 71-2 / Contratação de Component 1: Sustainable Request for Single Stage - One 2019-11- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- servicos gráficos de TF / 18765 and Adaptive Community Post Limited 617.02 Completed Quotations Envelope 24 04 14 11 13 20 materiais de divulgação Initiatives (placas e faixas) SUB 181-3 / Contratação de aluguel de ônibus para Component 1: Sustainable Pending Request for Single Stage - One 2019-12- 2019-12- 2020-02- viagem de intercâmbio - TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 11 28 26 Visitas às comunidades Initiatives ation Guarani do Paraguai SUB 105-2 / Serviços de impressão gráfica para Component 1: Sustainable produzir o caderno de Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-04- TF / 18765 and Adaptive Community Post Limited 3,527.07 Completed planos de gestão e práticas Quotations Envelope 17 18 06 14 03 09 Initiatives de produção tradicionais quilombolas personalizadas SUB 105 -20 / Serviços de Diagramação/produção de arte para produzir o Component 1: Sustainable Under Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2020-02- caderno de planos de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 18 15 29 gestão e práticas de Initiatives ation produção tradicionais quilombolas e para confecção de camisetas personalizadas SUB 105 -21 / Serviços Component 1: Sustainable Request for Single Stage - One 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- Técnicos em Cartografia/ TF / 18765 and Adaptive Community Post Limited 2,562.64 Signed Quotations Envelope 15 19 04 12 03 Mapeamento Initiatives SUB 26-20 / Impressão de Component 1: Sustainable 1000 cadernos, com Request for Single Stage - One 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- TF / 18765 and Adaptive Community Post Limited 926.23 Completed informativos dos resultados Quotations Envelope 20 03 02 11 01 19 Initiatives do projeto Component 1: Sustainable SUB 120.17 / Serviços Request for Single Stage - One 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-05- TF / 18765 and Adaptive Community Post Limited 1,711.62 Completed gráficos Quotations Envelope 27 06 30 17 19 27 Initiatives AI2-6 / Serviços de Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-02- 2020-04- Impressão de materiais TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 06 06 informativos para o projeto Initiatives ation AI2-7 / Serviços de Component 1: Sustainable impressão de material para Request for Single Stage - One 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2020-02- TF / 18765 and Adaptive Community Post Limited 178.47 Completed ser distribuído no seminário Quotations Envelope 09 20 23 22 23 10 Initiatives da APOINME AI2-8 / Serviços de tratorista para realização de Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-02- 2020-02- marcação de curvas de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 05 11 níveis e terracemanento nas Initiatives ation áreas de erosão AI2-10 / Confecção de Component 1: Sustainable Under Request for Single Stage - One 2020-01- 2020-03- 2020-01- 2020-02- camisetas personalizadas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 10 26 25 para Conselho Terena Initiatives ation AI2-11 / Locação de ônibus Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-01- 2020-02- para assembleia do povo TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 26 25 terena Initiatives ation Page 19 AI3 - 8 / Serviço de pessoa Component 1: Sustainable jurídica para construção e Request for Single Stage - One 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- TF / 18765 and Adaptive Community Post Limited 1,197.60 Signed desenvolvimento de novo Quotations Envelope 30 31 13 17 14 Initiatives layout do site do MIQCB BR-CAA-156149-NC-RFQ / Contratação de traslado - MOCxAEFAxMOC para os participantes dos cursos de Component 2: Capacity Pending Request for Single Stage - One 2020-02- 2020-02- 2020-05- Plantas Medicianais ( 30 TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 04 16 16 participantes) + Strengthening ation Empoderamento Feminino e Incidência Política (30 participantes - 2 módulos) BR-CAA-156150-NC-RFQ / Serviço de buffer/alimentação para os Component 2: Capacity Pending cursos a serem realizadas Request for Single Stage - One 2020-02- 2020-02- 2020-05- TF / 18765 Building and Institutional Post Limited 0.00 Implement na AEFA = Plantas Quotations Envelope 04 16 16 Strengthening ation Medicianais ( 30 participantes) + Empoderamento Feminino e Incidência Política (30 participantes - 2 módulos) SUB 268 - 10 / Contratação de serviços de filmagens Component 1: Sustainable Pending Request for Single Stage - One 2020-05- 2020-06- 2020-07- para elaboração de 3 curtas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 15 15 sobre a produção de Initiatives ation artesanato dos Myky SUB 16 - 25 / Serviços de Component 1: Sustainable Pending Request for Single Stage - One 2020-05- 2020-06- 2020-07- mão de obra para instalação TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 13 13 de postes elétricos Initiatives ation SUB 100 - 21 / Contratação Component 1: Sustainable Pending de serviços de ilustração e Request for 2020-05- 2020-06- 2020-07- TF / 18765 and Adaptive Community Post 0.00 Implement diagramação para material Quotations 28 11 11 Initiatives ation gráfico SUB 100 - 22 / Contração Component 1: Sustainable Pending Request for Single Stage - One 2020-06- 2020-06- 2020-07- de serviços de gráfica para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 15 15 impressão de cartilhas Initiatives ation BR-CAA-110429-NC-DIR / Contratação de licenças de pacote de programas, Component 2: Capacity Under ADOBE, de edição de 2020-06- 2020-08- 2020-06- 2020-08- 2020-06- 2020-12- TF / 18765 Building and Institutional Post Direct Selection Direct 2,123.80 Implement imagem, vídeo, áudio, 01 13 08 13 14 11 Strengthening ation arquivos PDF, de diagramação, entre outros, objetivando atingir o público do projeto DGM e Subprojetos AI3-6 / Aquisição de um Component 1: Sustainable Request for Single Stage - One 2020-06- 2020-06- 2020-08- 2020-07- 2020-10- 2020-07- sistema pronto para gestão TF / 18765 and Adaptive Community Post Limited 3,250.11 Completed Quotations Envelope 19 30 14 07 13 09 financeira do MIQCB. Initiatives Component 1: Sustainable Pending SUB 211 - 10 / Contratação Request for Single Stage - One 2020-07- 2020-07- 2020-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de serviços de internet rural Quotations Envelope 03 28 31 Initiatives ation SUB 99-17 / Contratação Component 1: Sustainable Pending de serviço de limpeza e Request for Single Stage - One 2018-07- 2018-07- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement revestimento de poço Quotations Envelope 05 22 20 Initiatives ation artesiano. BR-CAA-181729-NC-RFQ / Component 2: Capacity Pending Request for Single Stage - One 2020-07- 2020-08- 2020-09- Contratação de serviço de TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 15 31 30 impressão para guia de Strengthening ation povos SUB 16 - 26 / Serviços de Component 1: Sustainable 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- mão de obra para instalação TF / 18765 and Adaptive Community Post Direct Selection Direct 1,288.06 Completed 17 24 22 29 28 28 27 19 de postes elétricos Initiatives AI2- 17 / Contratação de Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-08- 2020-09- serviço para instalação do TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 23 22 sistema de irrigação Initiatives SUB 90 - 6 / Criação de identidade visual e Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-08- 2020-10- confecção e impressão de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 23 22 rotulagem dos produtos da Initiatives ation Central do Cerrado BR-CAA-189883-NC-RFQ / Contratação de serviços de Component 2: Capacity Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- diagramação de Cartilha TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 04 19 18 sobre Formação de Strengthening ation Lideranças para mulheres SUB 99 - 21 / Contratação Component 1: Sustainable Request for Single Stage - One 2020-09- 2020-10- 2020-10- 2020-10- 2020-12- de serviços para perfuração TF / 18765 and Adaptive Community Post Limited 8,221.77 Signed Quotations Envelope 13 13 02 21 01 de poço artesiano Initiatives SUB 250-10 / Aquisição de um sistema pronto para Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2021-01- gestão TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 15 09 08 administrativa/financeira da Initiatives ation CIMQCB. BR-CAA-198604-NC-DIR / Component 2: Capacity Pending Contratação de Serviços do 2020-10- 2020-10- 2020-10- 2021-06- TF / 18765 Building and Institutional Post Direct Selection Direct 0.00 Implement Google WorkSpace 07 10 14 11 Strengthening ation Enterprise Plus SUB 25-10 N / Serviço de Component 1: Sustainable Request for Single Stage - One 2020-11- 2020-12- 2020-12- 2020-12- 2021-01- 2020-12- diagramação e impressão de TF / 18765 and Adaptive Community Post Limited 790.60 Completed Quotations Envelope 26 01 08 08 07 30 cartilhas Initiatives BR-CAA-156155-NC-RFQ / Contratacao de empresa especializada em servicos de agenciamento de viagens Component 1: Sustainable Pending Request for Single Stage - One 2020-02- 2020-03- 2020-11- e fornecimento de TF / 18765 and Adaptive Community Post Open - National 0.00 Implement Quotations Envelope 07 08 13 passagens aereas regionais Initiatives ation nacionais e internacionais e passagens terrestres para realizacao das atividades DGM Brasil SUB 109 - 17 / Aquisição Component 1: Sustainable de moinho industrial para 2021-01- 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-05- TF / 18765 and Adaptive Community Post Direct Selection Direct 8,868.71 Signed unidade de beneficiamento 12 21 17 25 26 19 26 Initiatives do projeto SUB 26-18 / CT26.18 Contratacao de um profissional tecnico para Component 1: Sustainable realizar uma oficina de Request for Single Stage - One 2017-10- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled dezesseis horas sobre Quotations Envelope 11 15 14 Initiatives aprendizados conhecimentos e uso das ervas medicinais do cerrado BR-CAA-231407-NC-RFQ / Contratação de Serviço de Component 3: Project Pending Diagramação do livro sobre Request for Single Stage - One 2021-05- 2021-05- 2021-07- TF / 18765 Management, Monitoring Post Limited 0.00 Implement o Plano de Capacitação para Quotations Envelope 01 27 26 and Evaluation ation os subprojetos do Mecanismo de Doação Dedicado BR-CAA-231409-NC-RFQ / Contratação de Serviços Component 3: Project Pending para Ilustração do livro Request for Single Stage - One 2021-05- 2021-05- 2021-07- TF / 18765 Management, Monitoring Post Limited 0.00 Implement sobre o Plano de Quotations Envelope 01 27 26 and Evaluation ation Capacitação para os subprojetos do Mecanismo de Doação Dedicado SUB 241 - 9 / Aquisição de material pedagógico para Component 1: Sustainable Pending Request for Single Stage - One 2021-06- 2021-07- 2021-08- realização de atividades TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 12 09 previstas no plano de Initiatives ation gestão do território CONSULTING FIRMS Activity Reference No. Short List and Draft Opening of Combined Loan / Credit Market Contract Type Actual Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual BR-CAA-184206-CS-CQS / Contratação de empresa especializada para Component 2: Capacity Consultant realização de formação em Pending 2020-07- 2020-08- 2020-08- 2020-10- TF / 18765 Building and Institutional Post Qualification Open - National 0.00 viabilidade econômica, Implementation 19 04 10 09 Strengthening Selection gestão democrática e inserção no mercado, para projetos apoiados pelo DGM/FIP/Brasil. BR-CAA-197005-CS-QBS / Consultoria empresarial para prover orientações Component 2: Capacity Consultant técnicas e assessoria na Under 2020-10- 2020-10- 2020-10- 2021-01- 2020-12- 2020-12- 2020-12- 2021-03- TF / 18765 Building and Institutional Post Qualification Open - National 0.00 regularização fiscal, jurídica Implementation 01 05 22 08 05 15 25 25 Strengthening Selection e contábil das organizações proponentes dos subprojetos e beneficiárias do DGM. INDIVIDUAL CONSULTANTS Activity Reference No. Invitation to Loan / Credit Market Actual Process Draft Negotiated Contract / Description Component Review Type Method Contract Type Teams of Reference Identified/Selected Signed Contract No. Approach Amount (US$) Status Contract Completion Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-CAA-3212-CS-INDV / contratacao de consultoria Component 1: Sustainable Individual Pending 2016-09- 2016-11- 2016-11- 2016-11- 2017-05- individual para realizar duas TF / 18765 and Adaptive Community Post Consultant Open 0.00 Implementation 09 04 08 16 15 oficinas anuais elaboracao Initiatives Selection de projetos BR-CAA-3248-CS-INDV / contratacao de consultoria individual para realizar segundo seminario tematico Component 2: Capacity Individual 2017-02- 2017-03- 2017-04- 2017-05- 2017-07- anual de sustentabilidade TF / 18765 Building and Institutional Post Consultant Open 0.00 Canceled 06 22 12 02 01 socioambiental situando o Strengthening Selection projeto na politica global sobre mudancas climaticas e seus componentes BR-CAA-3254-CS-INDV / Contratacao de consultoria individual para realizar Component 2: Capacity Individual terceiro seminario tematico Pending 2018-02- 2018-03- 2018-04- 2018-04- 2018-07- TF / 18765 Building and Institutional Post Consultant Open 0.00 anual de politicas publicas e Implementation 01 30 02 04 03 Strengthening Selection programas e acoes governamentais relacionados aos objetivos do projeto BR-CAA-17586-CS-INDV / Contratacao de consultoria Component 2: Capacity Individual individual para realizar Pending 2017-06- 2017-08- 2017-08- 2017-09- 2018-02- TF / 18765 Building and Institutional Post Consultant Open 0.00 primeiro Implementation 14 02 23 27 24 Strengthening Selection seminario tematico anual e oficina sobre REDD SUB 55-14 / CT55.14 Contratacao de consultoria tecnica especializada na Component 1: Sustainable Individual 2017-07- 2018-04- 2017-07- 2018-05- 2017-07- 2018-05- 2017-07- 2018-05- 2017-09- area de engenharia de TF / 18765 and Adaptive Community Post Consultant Limited 2,579.38 Signed 07 02 12 21 22 29 31 31 29 alimentos com experiencia Initiatives Selection em agroindustria familiar e comunitaria SUB 55-15 / CT55.15 Contratacao de profissional para realizar estudo ecologico da cagaita e do Component 1: Sustainable Individual araticum realizando o 2017-07- 2017-12- 2017-07- 2018-03- 2017-07- 2018-04- 2017-08- 2018-04- 2017-09- 2018-12- TF / 18765 and Adaptive Community Post Consultant Limited 2,636.75 Completed inventario e pesquisa 05 20 10 28 25 05 01 10 30 10 Initiatives Selection ecologica para avaliacao da densidade e produtividade de cagaita e araticum no territorio quilombola SUB 55-16 / CT55.16 Contratacao de profissional com experiencia em Component 1: Sustainable Individual Pending 2017-07- 2017-07- 2017-07- 2017-08- 2017-09- producao de mudas de TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 07 12 28 04 13 pequi para realizar Oficina Initiatives Selection de Capaciracao em producao de mudas de pequi SUB 56-18 / CT56.18 Contratacao de consultoria Component 1: Sustainable Individual 2017-07- 2017-07- 2017-08- 2018-01- 2017-08- 2017-08- 2017-08- 2018-01- 2019-06- 2018-03- tecnica especializada em TF / 18765 and Adaptive Community Post Consultant Limited 18,828.57 Completed 12 10 01 09 06 10 17 22 08 28 recuperacao de nascentes e Initiatives Selection microbacias na regiao SUB 75-3 / CQ75.3 Contratação de consultoria Component 1: Sustainable Individual para realizar diagnostico Pending 2017-07- 2017-07- 2017-07- 2017-08- 2017-11- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 com objetivo a elaboração Implementation 05 15 30 17 15 Initiatives Selection de plano de desenvolvimento de turismo sustentável SUB 75-4 / CQ75.4 Contratação de profissional para realizar diagnostico ambiental com objetivo a Component 1: Sustainable Individual Pending 2017-07- 2017-07- 2017-08- 2017-08- 2017-11- elaboração de dois planos TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 10 20 10 17 15 de gestão ambiental e dois Initiatives Selection projetos arquitetônicos com memorial descritivo e orçamento SUB 90-6 / CT90.6 Contratação de consultoria Component 1: Sustainable Individual 2017-07- 2017-07- 2017-08- 2017-08- 2017-11- para a formação em Gestão TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 11 21 05 14 12 de Operações de Remessa e Initiatives Selection Transporte de produtos SUB 109-13 / CT109.13 Contratação de consultoria especializado na área de Component 1: Sustainable Individual administração gestão de Pending 2017-08- 2017-09- 2017-09- 2017-10- 2018-07- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 associação comunitária e Implementation 15 02 22 02 09 Initiatives Selection comercialização para elaborar plano de comercialização dos produtos do babaçu SUB 28-1 / Contratação de Component 1: Sustainable Individual serviços de assessoria Pending 2017-09- 2017-09- 2017-09- 2017-10- 2019-02- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 técnica para Implementation 15 20 25 14 26 Initiatives Selection acompanhamento das atividades do projeto SUB 113-19 / Contratação de consultoria para Component 1: Sustainable Individual realização de estudo Pending 2017-09- 2017-10- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 etnográfico, com ênfase nos Implementation 15 05 16 27 25 Initiatives Selection recursos hídricos da Terra Indígena Portal do Encantado. SUB 120-14 / Contratação de profissional para Component 1: Sustainable Individual realização de estudo Under 2018-01- 2018-02- 2018-03- 2018-04- 2018-07- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 antropológico para Implementation 25 24 26 12 11 Initiatives Selection compreensão da visão econômica e gênero nos grupos de coletores do tix. SUB 127-32 / Consultoria individual para elaboracao Component 1: Sustainable Individual Pending 2017-11- 2017-12- 2017-12- 2018-01- 2018-02- de planta baixa do Centro TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 22 05 15 03 12 de Revitalizacao da cultura e Initiatives Selection visitacao AI1 - 7 / Consultoria técnica para elaboração da propostas metodológica e conteúdo programático da Component 1: Sustainable Individual Pending 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- reunião. Moderação da TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 06 26 05 19 20 reunião, sistematização da Initiatives Selection relatoria e elaboração de relatórios técnico e interlocução com os articuladores indígenas. SUB 25-17 / CQ25.17 Component 1: Sustainable Individual 2017-06- 2017-07- 2017-07- 2017-07- 2019-03- Contratação de assessoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 19 05 15 31 23 técnica para execução Initiatives Selection projeto SUB 74-11 / Contratação de profissional técnico Component 1: Sustainable Individual 2017-09- 2017-09- 2017-09- 2017-10- 2018-09- especializada para TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 13 18 23 10 15 assessoria e Initiatives Selection acompanhamento das atividades do projeto. SUB 108-4 / Contratação Component 1: Sustainable Individual 2017-09- 2017-09- 2017-09- 2017-10- 2019-03- de serviços de assessoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 08 13 23 04 08 para execução do projeto Initiatives Selection SUB 113-4 / Contratação Component 1: Sustainable Individual de serviços de assessoria 2017-09- 2017-09- 2017-09- 2017-10- 2018-12- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled técnica especializada na 08 13 21 20 24 Initiatives Selection execução do projeto Component 1: Sustainable Individual SUB 30 - 33 / Contratação 2017-09- 2017-09- 2017-10- 2017-10- 2019-02- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled de assessoria técnica. 10 30 10 24 06 Initiatives Selection SUB 88-8 / Consultoria individual para desenvolvimento de laudo Component 1: Sustainable Individual antropológico para a Under 2018-01- 2018-02- 2018-02- 2018-03- 2018-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 consecução dos objetivos Implementation 24 14 23 09 25 Initiatives Selection do Projeto destacando os potenciais e as vulnerabilidades do território. Page 20 CT26-18 / Contratacao de um profissional para Component 1: Sustainable Individual realizar uma avaliacao Pending 2018-01- 2018-02- 2018-02- 2018-02- 2019-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 tecnica e dar Implementation 18 07 12 26 19 Initiatives Selection recomendacoes sobre a recuperacao de duas areas que acessavam agua SUB 88 - 9 / Consultoria individual para desenvolvimento de um diagnóstico socioambiental Component 1: Sustainable Individual por meio da produção de Under 2018-01- 2018-02- 2018-02- 2018-03- 2018-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 laudo ambiental para a Implementation 24 13 23 09 25 Initiatives Selection consecução dos objetivos do projeto destacando os potenciais e as vulnerabilidades do território SUB 135-22 / Contratação Component 1: Sustainable Individual 2017-09- 2017-09- 2017-09- 2017-10- 2018-01- de profissional TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 15 20 27 07 05 especializado em bio Initiatives Selection construção SUB 26-19 / Contratacao Component 1: Sustainable Individual de consultoria para fazer o 2018-01- 2019-08- 2018-02- 2019-09- 2018-02- 2019-10- 2018-02- 2019-11- 2018-05- 2020-02- TF / 18765 and Adaptive Community Post Consultant Limited 2,330.55 Completed mapeamento da morraria 18 19 07 05 12 18 26 01 27 28 Initiatives Selection mapa etnoambiental SUB 108-2 / Contratação de prestação de serviços Component 1: Sustainable Individual especializado para 2017-09- 2017-10- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled realização de capacitação 15 05 16 30 28 Initiatives Selection em boas práticas para produção de alimentos. SUB 108-3 / Contratação de prestação de serviços Component 1: Sustainable Individual 2017-09- 2017-10- 2017-10- 2017-11- 2018-02- especializado para TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 25 13 25 08 06 realização de capacitação Initiatives Selection em gestão da unidade de beneficiamento. SUB 113-9 / Contratação Component 1: Sustainable Individual 2017-09- 2017-09- 2017-10- 2017-10- 2018-01- de instrutor para realização TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 11 16 07 23 11 de oficina de apicultura. Initiatives Selection AI1 - 6 / Consultoria para suporte no planejamento, proposta metodológica e conteúdo programático, Component 1: Sustainable Individual com foco nos aspectos Pending 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 jurídicos, preparação dos Implementation 06 26 05 19 20 Initiatives Selection materiais de apoio, elaboração de relatório sobre processo de constituição de personalidade jurídica SUB 26-15 / CT26.15 Component 1: Sustainable Individual 2017-06- 2017-06- 2017-07- 2017-08- 2017-11- Contratacao de consultoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 19 24 15 03 01 para assessoria tecnica Initiatives Selection SUB 16-12 / CQ16-12 Component 1: Sustainable Individual 2017-06- 2017-07- 2017-07- 2017-08- 2019-03- Contratação de assessoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 19 09 19 02 25 técnica especializada. Initiatives Selection SUB 16-13 / CQ16-13 Component 1: Sustainable Individual 2017-06- 2017-07- 2017-07- 2017-08- 2019-03- Contratação de assessoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 19 09 19 02 25 técnica em comunicao Initiatives Selection SUB 100 - 9 / Consultoria Component 1: Sustainable Individual individual para implantação 2017-12- 2018-01- 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled de modelos de sistemas 20 09 19 02 14 Initiatives Selection agroflorestais. SUB 135-6 / Contratação Component 1: Sustainable Individual de assessoria para 2017-09- 2017-09- 2017-10- 2017-10- 2019-07- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled acompanhamento e das 25 30 07 17 29 Initiatives Selection ações do projeto SUB 123-14 / Contratação de consultoria para Component 1: Sustainable Individual Under 2018-04- 2019-11- 2018-05- 2018-05- 2018-06- 2018-12- construção coletiva de TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 27 07 02 29 06 03 estratégias de Initiatives Selection comercialização para o artesanato Karajá SUB 123-13 / Contratação consultoria para desenvolvimento da identidade visual da Component 1: Sustainable Individual associação. Produtos: 2018-04- 2018-05- 2018-05- 2018-06- 2020-01- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled marca, blog/site, catalogo 27 04 25 04 25 Initiatives Selection virtual, embalagens, rótulos, etiquetas, redes sociais, etc...) e acompanhamento técnico projeto. SUB 109-15 / Contratação de profissional para elaboração da planta e Component 1: Sustainable Individual memorial descritivo da Under 2018-06- 2019-08- 2018-06- 2018-06- 2018-07- 2018-09- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 reforma da agroindústria, Implementation 10 08 20 25 05 03 Initiatives Selection de acordo com a legislação vigente e realização de curso de boas práticas de produção. 122-13 / Contratação de consultor individual em geoprocessamento para Component 1: Sustainable Individual elaboracao de etno mapas, Pending 2018-09- 2018-09- 2018-09- 2018-10- 2019-04- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 de localização, Implementation 06 11 26 06 04 Initiatives Selection espacializacaoo de nascentes, mapas históricos, relevo e hidrografico. 125-14 / Contratacao de Component 1: Sustainable Individual consultoria individual para Under 2018-09- 2019-05- 2018-09- 2018-09- 2018-10- 2019-04- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 elaboracao de plano de Implementation 06 08 16 26 13 11 Initiatives Selection gestao ambiental e territorial SUB 143 - 12 / Contratação Component 1: Sustainable Individual de consultoria individual Under 2019-01- 2019-04- 2019-01- 2019-01- 2019-01- 2019-07- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 para elaboração de plano de Implementation 07 02 12 15 25 24 Initiatives Selection gestão ambiental e territorial. SUB 26 -16 / Contratação de uma consultoria técnica especializada para realizar Component 1: Sustainable Individual 2019-02- 2019-07- 2019-02- 2019-03- 2019-02- 2019-09- 2019-02- 2019-10- 2019-08- 2020-04- uma avaliação técnica e dar TF / 18765 and Adaptive Community Post Consultant Limited 1,750.36 Completed 06 19 12 08 18 07 27 09 26 30 recomendações sobre a Initiatives Selection recuperação de duas áreas que corriam água antes. BR-CAA-102339-CS-CDS / Contratação de consultoria individual especializada para orientação e promoção Component 2: Capacity Individual 2019-02- 2019-03- 2019-03- 2019-04- 2019-07- de informação qualificada TF / 18765 Building and Institutional Post Consultant Limited 0.00 Canceled 28 05 19 09 08 sobre a estratégia de Strengthening Selection REDD+ no contexto nacional e global, para público diversificado do Projeto DGM/Brasil SUB 16-14 / CQ16-14 Contratação de consultoria Component 1: Sustainable Individual Pending 2017-06- 2017-07- 2017-07- 2017-08- 2017-11- para elaboração de projeto TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 20 10 20 03 01 técnico de recuperação de Initiatives Selection nascentes e das áreas SUB 71 CI 01 / Consultoria Individual para elaboração do manual de boas práticas para os produtos do coco, realização do plano de Component 1: Sustainable Individual 2019-03- 2019-06- 2019-05- 2019-05- 2019-05- 2019-08- negócios. Estudo, TF / 18765 and Adaptive Community Post Consultant Open 0.00 Canceled 25 05 01 06 26 24 Padronização, adaptação Initiatives Selection dos produtos e da produção, boas práticas, armazenamento, estoque, dos produtos da Raízes do Campo BR-CAA-110404-CS-INDV / Contratação de consultoria individual para aplicar metodologia, técnicas e procedimentos Component 2: Capacity Individual 2019-04- 2019-07- 2019-05- 2019-06- 2019-07- 2019-12- associados à autoprodução TF / 18765 Building and Institutional Post Consultant Limited 0.00 Canceled 29 16 19 13 18 15 comunitária de painéis-kits Strengthening Selection solares, dimensionamento, montagem e instalação de pequenos sistemas de geração de energia elétrica solar. AI4 - 1 / Contratação de consultoria individual para Component 1: Sustainable Individual oficinas sobre tema REDD+, 2019-05- 2019-06- 2019-06- 2019-07- 2019-06- 2019-10- 2019-06- 2019-10- 2019-08- 2020-04- TF / 18765 and Adaptive Community Post Consultant Limited 3,124.74 Completed e produzir uma minuta de 27 12 06 11 14 15 22 15 21 30 Initiatives Selection conteúdo do folder que será distribuído SUB 195 - 2 / Contratação Component 1: Sustainable Individual de consultoria para Under 2019-06- 2019-10- 2019-07- 2019-07- 2019-08- 2019-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 elaboração de Plano Implementation 25 18 10 25 04 03 Initiatives Selection Territorial e Ambiental da TI Sandradouro. SUB 2120-2 / Contratação Component 1: Sustainable Individual de consultoria para Pending 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 realização de planta baixa Implementation 24 09 24 03 02 Initiatives Selection para construção da cozinha comunitária SUB 241-6 / Contratação Component 1: Sustainable Individual de consultoria para Under 2019-06- 2019-08- 2019-06- 2019-09- 2019-07- 2019-10- 2019-08- 2019-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 elaboração de Plano de Implementation 17 26 22 06 13 14 17 16 Initiatives Selection Gestão Territorial, Produtiva e Ambiental SUB 71 CI 02 / Consultoria Individual para elaboração do manual de boas práticas para os produtos do coco. Component 1: Sustainable Individual Under 2019-06- 2019-08- 2019-07- 2019-08- 2019-08- 2019-12- Estudo, Padronização, TF / 18765 and Adaptive Community Post Consultant Open 0.00 Implementation 27 08 26 05 20 18 adaptação dos produtos e Initiatives Selection da produção, boas práticas, armazenamento, estoque, dos produtos da Raízes do Campo. BR-CAA-110405-CS-INDV / Contratação de consultoria individual, para aplicar metodologias, técnicas e procedimentos Component 2: Capacity 2019-07- 2019-06- 2019-08- 2019-10- 2020-04- associados a autoprodução TF / 18765 Building and Institutional Post Direct Selection Direct 0.00 Under Review 22 05 01 05 02 comunitária de painéis-kits Strengthening solares, dimensionamento, montagem e instalação de pequenos sistemas de geração, de elétrica solar SUB 169- CI 001.2019 / Component 1: Sustainable Individual Contratação de Consultoria 2019-09- 2019-09- 2019-10- 2019-09- 2019-10- 2019-11- 2019-11- 2019-12- 2020-01- 2020-06- TF / 18765 and Adaptive Community Post Consultant Limited 1,010.71 Completed Individual para 20 23 05 24 20 28 15 02 14 26 Initiatives Selection Levantamento dos atrativos turísticos. BR-CAA-133672-CS-INDV / Contratação de pessoa física para de criação, Component 2: Capacity Individual envolvendo pesquisas, Under 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2020-02- TF / 18765 Building and Institutional Post Consultant Limited 0.00 concepção, produção Implementation 15 14 30 05 15 12 Strengthening Selection musical, gravação, mixagem, masterização de trilha sonora vídeo musical do DGM/FIP/Brasil. BR-CAA-133677-CS-INDV / Contratação de profissional, pessoa física, para prover orientações técnicas junto aos Component 1: Sustainable Individual Under 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2020-02- subprojetos que estão TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 15 03 30 05 15 12 executando e/ou vão iniciar Initiatives Selection a execução de pequenas obras de reforma e/ou construções simples, adequadas às condições de vida dos povos indígenas, SUB 170 - CI 1 / Contratação de consultoria Component 1: Sustainable Individual Under 2019-09- 2019-09- 2019-09- 2019-10- 2019-10- 2020-02- para desenvolvimento de TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 20 23 30 05 12 09 SAFs e plantios Initiatives Selection consorciados (Ciências Agrárias) SUB 169- CI 002.2019 / Component 1: Sustainable Individual Contratação de Consultoria Under 2019-10- 2019-09- 2019-11- 2019-11- 2019-12- 2020-03- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Individual para diagnóstico Implementation 22 25 06 21 01 01 Initiatives Selection do conflito das associações BR-CAA-135088-CS-INDV / Contratação de Component 2: Capacity Individual 2019-10- 2020-08- 2019-10- 2020-03- 2019-10- 2020-06- 2019-11- 2020-09- 2020-02- 2021-05- profissional para realização TF / 18765 Building and Institutional Post Consultant Limited 7,584.71 Completed 10 13 15 09 30 10 15 01 13 05 de curso de formação de Strengthening Selection lideranças voltado para mulheres. BR-CAA-135429-CS-INDV / Consultoria individual para realização de oficina sobre comunicação estratégica Component 2: Capacity Individual 2019-09- 2020-08- 2019-10- 2019-10- 2019-10- 2020-04- 2019-10- 2020-09- 2020-02- 2021-06- junto a povos indígenas, TF / 18765 Building and Institutional Post Consultant Limited 8,458.05 Completed 24 13 09 25 14 10 22 16 19 04 quilombolas, comunidades Strengthening Selection tradicionais e parceiros do projeto e CAA, tendo por foco a juventude. SUB 3-10 / Contratação de serviços técnico especializado para Component 1: Sustainable Individual elaboração de planta baixa, 2017-09- 2017-09- 2017-10- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled com memorial descritivo e 11 16 01 10 09 Initiatives Selection orçamento para construção de um galpão para armazenamento e uso das comunidades indígenas. SUB 98 - 15 / Contratacao de assessoria tecnica para Component 1: Sustainable Individual elaborar projeto tecnico da 2018-01- 2018-02- 2018-02- 2018-03- 2018-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled casa cultura incluindo 22 09 19 05 21 Initiatives Selection projeto arquitetonico, memorial descritivo BR-CAA-133560-CS-INDV / Contratação de profissional para apoio Component 3: Project Individual junto a equipe financeira 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2020-01- TF / 18765 Management, Monitoring Post Consultant Limited 0.00 Canceled para análise dos 15 17 25 30 07 05 and Evaluation Selection lançamentos e correções no sistema de gestão, referente receitas e despesas dos anos 2015-2018 SUB 127-33 / Contratacao de profissional para elaboracao de Plano de Component 1: Sustainable Individual 2017-11- 2017-12- 2017-12- 2018-01- 2018-03- Funcionando do Centro de TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 28 12 26 08 09 Revitalizacao e treinamento Initiatives Selection aos colaboradores que irao trabalhar no local SUB 127-34 / Contratação de serviços para Component 1: Sustainable Individual criação/desenvolvimento de 2018-05- 2018-06- 2018-06- 2018-07- 2019-01- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled site - incluindo design e 31 05 26 06 02 Initiatives Selection programação e treinamento para alimentação do site. SUB 47-8 / Contratação de serviços especializados de Component 1: Sustainable Individual engenharia, para elaboração 2017-09- 2017-09- 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled de projeto básico de 11 16 26 10 09 Initiatives Selection reforma de um galpão e um ponto de beneficiamento de frutos. BR-CAA-166615-CS-INDV / Contratação de consultoria individual Component 2: Capacity Individual especializada, para a 2020-04- 2020-04- 2020-05- 2020-06- 2020-08- TF / 18765 Building and Institutional Post Consultant Direct 0.00 Canceled realização do módulo Curso 06 26 17 21 20 Strengthening Selection de aprofundamento em Energia Fotovoltaica junto a público diversificado do Projeto BR-CAA-197009-CS-INDV / Contratação de consultor individual para profissional da área de educação à Component 2: Capacity Individual distância ou ambiente Pending 2020-10- 2020-10- 2020-11- 2020-11- 2021-02- TF / 18765 Building and Institutional Post Consultant Open 0.00 virtual de aprendizagem Implementation 04 31 10 18 16 Strengthening Selection para ministrar cursos sobre o domínio de plataformas digitais, ferramentas e recursos disponíveis BR-CAA-239241-CS-INDV / Contratacao de consultoria individual especializada para Component 2: Capacity Individual Pending 2021-06- 2021-08- 2021-08- 2021-09- 2022-03- orientacao e promocao de TF / 18765 Building and Institutional Post Consultant Open 0.00 Implementation 14 02 23 27 26 informacao qualificada Strengthening Selection sobre a estrategia de REDD+ no contexto nacional e global, para publico diversificado do Projeto DGM Brasil Page 21 PROCUREMENT PLAN Project information: Uganda, East Africa Skills for Transformation and Regional Integration Project (EASTRIP) P163399 Project Implementation agency: Inter-University Council for East Africa Date of the Procurement Plan: April 27, 2018 Period covered by this Procurement Plan: May 2018- January 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: As IUCEA does not follow Uganda PPDA, when approaching the national market (as specified in the Procurement Plan tables in STEP), Bank’s Procurement Regulations will be followed. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations –Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None PROCUREMENT Eastern Africa : East Africa Skills for Transformation and Regional Integration Project (EASTRIP) PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2019-04-12 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163399 GPN Date: 2019-08-06 Project Name: East Africa Skills for Transformation and Regional Integration Project (EASTRIP) Loan / Credit No: IDA / 63350 M Executing Agency(ies): inistry of Science and Higher Education - ET WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ET-MOSHE - ET-109520-CW- RFB / Construction of Building Pending Creating national TVET Single Stage - One 2021-01- Lot-1 TVET QA Authority IDA / 63350 Post Request for Bids Open - National 1,600,000.00 0.00 Implementat 2020-04-13 2020-04-18 2020-05-30 2020-06-29 2020-08-03 enabling environment Envelope 30 Lot-2 Research and ion Development Institute (at TI) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOSHE - ET-109515-GO- Creating national TVET Single Stage - One IDA / 63350 Prior Request for Bids Open - International 2,100,000.00 0.00 Canceled 2019-06-28 2019-07-03 2019-08-14 2019-09-13 2019-10-18 2020-04-15 RFB / Procurement of Vehicles enabling environment Envelope ET-MOSHE - ET-135533-GO- Creating national TVET Request for Single Stage - One RFQ / Procurement of Office IDA / 63350 Post Open - National 76,000.00 0.00 Canceled 2019-10-06 2019-12-01 2020-05-29 enabling environment Quotations Envelope Furniture ET-MOSHE - ET-138762-GO- Creating national TVET Request for Single Stage - One RFQ / Purchase of office IDA / 63350 Post Open - National 5,000.00 2,276.13 Signed 2019-10-14 2019-12-09 2020-08-04 2020-06-06 enabling environment Quotations Envelope stationary ET-MOSHE - ET-167220-GO- Creating national TVET Request for Single Stage - One IDA / 63350 Post Limited 15,000.00 14,059.94 Signed 2020-04-08 2020-04-06 2020-06-03 2020-05-20 2020-11-30 RFQ / Laptop purchase enabling environment Quotations Envelope ET-MOSHE - ET-173744-GO- RFQ / Office Furniture Creating national TVET Request for Single Stage - One IDA / 63350 Post Limited 38,000.00 21,240.35 Signed 2020-05-23 2020-06-12 2020-07-18 2020-06-09 2021-01-14 Procurement for the new enabling environment Quotations Envelope project office ET-MOSHE - ET-176097-GO- Creating national TVET UN Agencies UN / Procurement of different IDA / 63350 Post Direct 1,000,000.00 960,539.47 Signed 2020-06-05 2020-06-12 2020-06-10 2020-06-18 2020-07-15 2020-07-17 2021-01-11 enabling environment (Direct) types of Vehicles ET-MOSHE - ET-181056-GO- Pending RFQ / Procurement of Creating national TVET Request for Single Stage - One IDA / 63350 Post Limited 5,300.00 0.00 Implementati 2020-06-30 2020-08-14 2020-08-24 Sanitation and Canteen enabling environment Quotations Envelope on Materials for the project office ET-MOSHE - ET-181058-GO- Pending Creating national TVET Request for Single Stage - One RFQ / Procurement of Office IDA / 63350 Post Limited 6,700.00 0.00 Implementati 2020-06-30 2020-08-10 2020-08-20 enabling environment Quotations Envelope Furniture and Fixtures on ET-MOSHE - ET-181057-GO- Pending Creating national TVET Request for Single Stage - One RFQ / Procurement of Office IDA / 63350 Post Limited 43,000.00 0.00 Implementati 2020-06-30 2020-08-10 2020-08-20 enabling environment Quotations Envelope Equipment on ET-MOSHE - ET-181288-GO- Pending Creating national TVET Request for Single Stage - One RFQ / Procurement of IDA / 63350 Post Limited 7,000.00 0.00 Implementati 2020-06-30 2020-07-22 2020-08-01 enabling environment Quotations Envelope Stationery Materials on ET-MOSHE - ET-198515-GO- Pending Creating national TVET Single Stage - One RFB / Procurement of Diesel IDA / 63350 Post Request for Bids Open - National 150,000.00 0.00 Implementati 2020-10-30 2020-11-04 2020-12-04 2020-12-19 2021-01-23 2021-04-23 enabling environment Envelope Generator on ET-MOSHE - ET-198533-GO- Creating national TVET Single Stage - One RFB / Supply and Delivery of IDA / 63350 Post Request for Bids Open - International 1,000,000.00 0.00 Canceled 2020-11-25 2020-11-30 2021-01-11 2021-02-10 2021-03-17 2021-09-13 enabling environment Envelope Vehicles ET-MOSHE - ET-198496-GO- RFB / TVET Campus Network Creating national TVET Single Stage - One IDA / 63350 Prior Request for Bids Open - International 8,000,000.00 0.00 Canceled 2020-11-03 2021-04-13 2020-11-08 2020-12-20 2021-01-19 2021-02-23 2021-08-22 Infrastructure for the 19 enabling environment Envelope Colleges Strengthening selected ET-MOSHE - ET-225571-GO- Regional Flagship TVET Under RFQ / Procurement of Office Request for Single Stage - One IDA / 63350 Institutes for high quality Post Limited 75,000.00 0.00 Implementati 2021-03-28 2021-05-13 2021-05-17 2021-05-21 Furniture and Fixtures for Quotations Envelope skills development in priority on MoSHE sectors Strengthening selected ET-MOSHE - ET-225566-GO- Regional Flagship TVET Pending Single Stage - One RFB / Supply, Installation and IDA / 63350 Institutes for high quality Prior Request for Bids Open - International 2,300,000.00 0.00 Implementati 2021-03-31 2021-04-15 2021-05-30 2021-06-29 2021-07-24 2021-10-22 Envelope Commissioning of TVET MIS skills development in priority on sectors ET-MOSHE - ET-229183-GO- Pending Creating national TVET DIR / Procurement of IDA / 63350 Post Direct Selection Direct 1,000,000.00 0.00 Implementati 2021-04-20 2021-04-25 2021-05-30 2021-11-26 enabling environment Different Types of Vehicles on ET-MOSHE - ET-236746-GO- Under RFB / TVET Campus Network Creating national TVET Single Stage - One IDA / 63350 Prior Request for Bids Open - International 5,000,000.00 0.00 Implementati 2021-05-31 2021-06-18 2021-06-05 2021-06-24 2021-07-17 2021-08-16 2021-09-20 2022-03-19 Infrastructure for 10 selected enabling environment Envelope on Poly Technic Colleges NON CONSULTING SERVICES Page 1 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOSHE - ET-173347-NC- Under RFQ / Renovation and Creating national TVET Request for Single Stage - One IDA / 63350 Post Limited 18,000.00 0.00 Implementati 2020-05-20 2020-05-22 2020-07-15 2021-01-11 painting service of the newly enabling environment Quotations Envelope on rented Project Office Building ET-MOSHE - ET-173356-NC- RFQ / Selecting a firm that Creating national TVET Request for Single Stage - One manages the cleaning of the IDA / 63350 Post Limited 5,500.00 4,495.54 Signed 2020-05-20 2020-05-22 2020-07-15 2020-06-23 2021-01-11 enabling environment Quotations Envelope newly rented project office for one year period ET-MOSHE - ET-173367-NC- RFQ / Security Service- Under Creating national TVET Request for Single Stage - One Selecting a firm that manages IDA / 63350 Post Limited 6,500.00 0.00 Implementati 2020-05-27 2020-05-22 2020-07-22 2021-01-18 enabling environment Quotations Envelope the security of the office on building and office property CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOSHE - ET-198440-CS- QCBS / Development of 17 Creating national TVET Quality And Cost- Under IDA / 63350 Prior Open - International 1,800,000.00 0.00 2020-10-20 2020-11-13 2020-11-10 2020-11-22 2020-12-24 2021-03-23 2021-01-21 2021-02-20 2021-03-27 2021-05-01 2021-10-28 Occupational Standards in enabling environment Based Selection Implementation EASTRIP priority sectors ET-MOSHE - ET-198487-CS- Creating national TVET Quality And Cost- QCBS / Ethiopian Sustainable IDA / 63350 Prior Open - International 300,000.00 0.00 Canceled 2020-10-23 2020-11-13 2020-11-13 2020-11-22 2020-12-27 2021-01-24 2021-02-23 2021-03-30 2021-05-04 2021-10-31 enabling environment Based Selection TVET Financing Strategy ET-MOSHE - ET-198462-CS- QCBS / Selection of a Consulting Firm that develop Creating national TVET Quality And Cost- Under IDA / 63350 Post Open - National 27,000.00 0.00 2020-10-20 2020-10-27 2020-11-10 2020-11-02 2020-12-14 2020-12-11 2020-12-29 2021-01-28 2021-02-26 2021-04-02 2021-07-31 a strategic document for the enabling environment Based Selection Implementation Establishment of TVET Quality Assurance Agency ET-MOSHE - ET-198478-CS- QCBS / Development of Creating national TVET Quality And Cost- Under Strategic Framework for the IDA / 63350 Post Open - National 13,500.00 0.00 2020-10-25 2020-10-27 2020-11-15 2020-11-02 2020-12-29 2020-12-11 2021-01-13 2021-02-12 2021-03-13 2021-04-17 2021-08-15 enabling environment Based Selection Implementation Establishment of TVET Research Institute ET-MOSHE - ET-192202-CS- Creating national TVET Least Cost QCBS / External Audit for the IDA / 63350 Post Open - National 35,000.00 0.00 Canceled 2020-09-08 2020-09-21 2020-09-29 2020-10-15 2020-11-12 2020-12-10 2021-01-09 2021-02-13 2021-03-20 2021-09-16 enabling environment Selection FY 2019/2020 ET-MOSHE - ET-203190-CS- Creating national TVET Least Cost LCS / Selection of Financial IDA / 63350 Post Open - National 35,000.00 2,244.66 Signed 2020-11-09 2020-11-13 2020-11-19 2020-12-09 2020-11-19 2020-12-19 2020-12-07 2021-01-03 2020-12-07 2021-01-20 2020-12-11 2021-02-06 2020-12-15 2021-03-23 enabling environment Selection Audit Firm ET-MOSHE-ET-198487-CS- QCBS-2 / Selection of a Creating national TVET Quality And Cost- Under Consulting Firm to Develop IDA / 63350 Post Open - National 300,000.00 0.00 2021-02-20 2021-02-22 2021-02-23 2021-03-20 2021-04-10 2021-04-25 2021-05-30 2021-06-28 2021-10-26 enabling environment Based Selection Implementation Sustainable TVET Financing Strategy ET-MOSHE - ET-109513-CS- QCBS / Consultancy Service for Detail Engineering Design, Tender Document Creating national TVET Quality And Cost- IDA / 63350 Post Open - National 200,000.00 0.00 Canceled 2019-05-30 2021-04-06 2019-06-20 2019-08-03 2019-08-31 2019-09-30 2019-11-04 2019-12-09 2022-05-27 Preparation, Construction enabling environment Based Selection Supervision and contracts administration of QA Authority and Research and Development Institute. ET-MOSHE - ET-229572-CS- CQS / Consultancy Service for Detail Engineering Design, Consultant Tender Document Creating national TVET Under IDA / 63350 Post Qualification Limited 200,000.00 0.00 2021-04-25 2021-04-20 2021-05-09 2021-05-03 2021-06-08 2021-07-13 2023-01-04 Preparation, Construction enabling environment Implementation Selection Supervision and contracts administration of QA Authority and Research and Development Institute ET-MOSHE - ET-229840-CS- CQS / Selection of a Consultant Creating national TVET Under Consulting Firm to Develop an IDA / 63350 Post Qualification Limited 84,000.00 0.00 2021-04-23 2021-05-07 2021-05-07 2021-06-06 2021-07-11 2021-09-09 enabling environment Implementation Environment and Social Selection Impact Assessment (ESIA) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual ET-MOSHE - ET-109517-CS- Creating national TVET IDA / 63350 Prior Consultant Open 16,800.00 0.00 Canceled 2019-04-15 2019-09-30 2019-06-03 2019-06-24 2019-07-29 2020-07-28 INDV / Procurement Specialist enabling environment Selection ET-MOSHE - ET-110227-CS- Individual Creating national TVET Under INDV / Financial Management IDA / 63350 Post Consultant Open 14,400.00 0.00 2019-04-12 2019-09-03 2019-05-31 2019-06-21 2019-07-26 2020-07-25 enabling environment Implementation Specialist Selection Individual ET-MOSHE - ET-110232-CS- Creating national TVET Under IDA / 63350 Post Consultant Open 30,000.00 0.00 2019-04-18 2019-10-04 2019-06-06 2019-06-27 2019-08-01 2020-07-31 INDV / Safeguard Specialist enabling environment Implementation Selection Individual ET-MOSHE - ET-110321-CS- Creating national TVET IDA / 63350 Post Consultant Open 40,000.00 25,529.04 Signed 2019-04-12 2019-10-20 2019-05-31 2020-01-01 2019-06-21 2020-01-01 2019-07-26 2020-01-01 2020-07-25 INDV / Project Coordinator enabling environment Selection Page 2 ET-MOSHE - ET-129298-NC- Individual Creating national TVET Under RFP / Recruitment of TVET IDA / 63350 Post Consultant Open 14,400.00 0.00 2019-09-05 2019-09-13 2019-10-24 2019-11-14 2019-12-19 2020-12-18 enabling environment Implementation Specialist at MoSHE Selection Strengthening selected ET-MOSHE - ET-151599-CS- Regional Flagship TVET Individual INDV / Recruitment of IDA / 63350 Institutes for high quality Prior Consultant Limited 18,000.00 0.00 Canceled 2019-12-23 2019-12-25 2019-12-28 2019-12-26 2020-01-18 2020-02-22 2020-08-20 Procurement Specialist for skills development in priority Selection EASTRIP-MoSHE sectors ET-MOSHE - ET-155038-CS- Individual CDS / Recruitment of Creating national TVET IDA / 63350 Prior Consultant Limited 21,000.00 2,115.44 Signed 2020-01-24 2020-01-23 2020-01-29 2020-01-23 2020-02-19 2020-03-17 2020-03-25 2020-04-01 2020-09-21 Procurement Specialist for enabling environment Selection MoSHE ET-MOSHE - ET-110229-CS- Individual Creating national TVET INDV / Monitoring & IDA / 63350 Post Consultant Open 14,400.00 0.00 Canceled 2019-04-12 2019-10-04 2019-05-31 2019-06-21 2019-07-26 2020-07-25 enabling environment Evaluation Specialist Selection Strengthening selected ET-MOSHE - ET-164193-CS- Regional Flagship TVET Individual CQS / Procurement Specialist IDA / 63350 Institutes for high quality Prior Consultant Limited 20,000.00 17,587.48 Signed 2020-03-20 2020-05-01 2020-03-25 2020-08-24 2020-04-15 2020-10-08 2020-05-20 2020-10-15 2020-11-16 #2 skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual ET-MOSHE - ET-164194-CS- Under IDA / 63350 Institutes for high quality Post Consultant Limited 15,000.00 0.00 2020-03-23 2020-04-02 2020-03-28 2020-04-18 2020-05-23 2020-11-19 CQS / Finance Specialist # 2 Implementation skills development in priority Selection sectors Strengthening selected ET-MOSHE - ET-164195-CS- Regional Flagship TVET Individual CQS / Recruitment of IDA / 63350 Institutes for high quality Post Consultant Limited 20,000.00 15,366.96 Signed 2020-03-20 2020-03-23 2020-03-25 2020-05-15 2020-04-15 2020-11-11 2020-05-20 2020-10-12 2020-11-16 Monitoring and Evaluation skills development in priority Selection Specialist sectors Strengthening selected ET-MOSHE - ET-165716-CS- Regional Flagship TVET Individual Pending INDV / Gender Specialist IDA / 63350 Institutes for high quality Post Consultant Open 20,000.00 0.00 2020-03-27 2020-05-15 2020-06-05 2020-07-10 2021-01-06 Implementation Recruitment skills development in priority Selection sectors Strengthening selected ET-MOSHE - ET-172339-CS- Regional Flagship TVET Individual INDV / Contract Under IDA / 63350 Institutes for high quality Prior Consultant Open 22,000.00 0.00 2020-05-06 2020-05-11 2020-06-24 2020-07-15 2020-08-19 2021-02-15 Administration Officer Implementation skills development in priority Selection recruitment sectors ET-MOSHE - ET-173745-CS- Individual Creating national TVET Under INDV / Hiring an IDA / 63350 Post Consultant Limited 10,000.00 0.00 2020-05-20 2020-06-16 2020-05-25 2020-06-15 2020-07-20 2021-01-16 enabling environment Implementation Administrative Officer Selection ET-MOSHE - ET-201291-CS- INDV / Selection of Individual Individual Creating national TVET Consultant that supports in IDA / 63350 Post Consultant Limited 30,000.00 32,126.34 Signed 2020-11-05 2020-11-04 2020-11-10 2020-11-18 2020-11-25 2020-12-14 2020-12-06 2020-12-15 2021-06-04 enabling environment reviewing the College Building Selection Designs ET-MOSHE - ET-234036-CS- Individual INDV / TVET Specialist- Creating national TVET Under IDA / 63350 Post Consultant Limited 14,400.00 0.00 2021-05-16 2021-05-17 2021-05-21 2021-06-11 2021-07-16 2022-01-12 recruitment of TVET specialist enabling environment Implementation Selection for the NPCU ET-MOSHE - ET-234043-CS- Individual INDV / M&E Specialist- Creating national TVET Under IDA / 63350 Post Consultant Open 20,000.00 0.00 2021-05-12 2021-05-17 2021-06-30 2021-07-21 2021-08-25 2022-02-21 recruitment of M&E specialist enabling environment Implementation Selection at the NPCU level ET-MOSHE - ET-234849-CS- Individual Creating national TVET Under INDV / Procurement Officer IDA / 63350 Prior Consultant Open 21,000.00 0.00 2021-05-24 2021-06-03 2021-07-12 2021-08-02 2021-09-06 2022-09-01 enabling environment Implementation Selection Selection ET-MOSHE - ET-239009-CS- Individual INDV / Construction Finance Creating national TVET Pending IDA / 63350 Post Consultant Open 12,000.00 0.00 2021-06-18 2021-07-08 2021-07-11 2021-07-21 2021-07-26 Training Individual Consultant enabling environment Implementation Selection Selection Page 3 Proyecto de Gestión Integral de los Riesgos en el Sistema Agroindustrial Rural (GIRSAR) Monto – USD150 MILLONES PROCUREMENT Argentina : Integrated Risk Management in the Rural Agroindustrial System PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2019-03-22 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162316 GPN Date: Project Name: Integrated Risk Management in the Rural Agroindustrial System Loan / Credit No: IBRD / 88670 Rural Change Unit - Ministry of Agriculture Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AR-UCAR-186659-CW-RFB / Subproyecto "Prevención y control de incendios forestales de la Provincia de Mendoza" Pending Obras a realizar: Component 2 - Agricultural Single Stage - One 2022-02- IBRD / 88670 Post Request for Bids Open - National 4,963,200.00 0.00 Implementat 2021-05-03 2021-05-17 2021-06-28 2021-07-26 2021-08-30 1 central de coordinación risk mitigation investments Envelope 28 ion operativa, logística y de capacitación regional 2 bases de incendios 2 torres de observación 1 pista de aterrizaje AR-UCAR-216686-CW-RFB / Pending Subproyecto "Fortalecimiento Component 2 - Agricultural Single Stage - One 2022-02- IBRD / 88670 Post Request for Bids Open - National 832,160.00 0.00 Implementat 2021-05-03 2021-05-08 2021-06-19 2021-07-19 2021-08-23 Sanitario del rodeo bovino risk mitigation investments Envelope 19 ion provincial". Neuquén AR-UCAR-216690-CW-RFB / Subproyecto Pending Component 2 - Agricultural Single Stage - One 2022-02- "Reacondicionamiento y IBRD / 88670 Post Request for Bids Open - National 340,028.00 0.00 Implementat 2021-05-03 2021-05-08 2021-06-19 2021-07-19 2021-08-23 risk mitigation investments Envelope 19 Mejora del Sistema de Riego ion de Buta Ranquil". Neuquén AR-UCAR-216705-CW-RFB / Subproyecto "Readecuación de Pending Component 2 - Agricultural Single Stage - One 11,200,000.0 2022-05- caminos rurales: RP S/N IBRD / 88670 Prior Request for Bids Open - National 0.00 Implementat 2021-08-02 2021-08-07 2021-09-18 2021-10-18 2021-11-22 risk mitigation investments Envelope 0 21 Tramo RPN 32 (Seguí) – RPN ion 34". Entre Ríos. AR-UCAR-186648-CW-RFB / Subproyecto "Acueducto Pending Component 2 - Agricultural Single Stage - One 2021-06- Ganadero La Providencia, La IBRD / 88670 Post Request for Bids Open - National 5,848,818.00 0.00 Implementat 2020-08-24 2020-09-01 2020-10-13 2020-11-10 2020-12-15 risk mitigation investments Envelope 15 Ramada y Santa Ana" - ion Provincia de Córdoba AR-UCAR-216721-CW-RFB / Pending Subproyecto "Mejora de la red Component 2 - Agricultural Single Stage - One 2022-06- IBRD / 88670 Post Request for Bids Open - National 2,955,039.00 0.00 Implementat 2021-09-06 2021-09-11 2021-10-23 2021-11-22 2021-12-27 de riego del Valle de Jáchal". risk mitigation investments Envelope 25 ion San Juan. AR-UCAR-216723-CW-RFB / Subproyecto "Sistema Pending Component 2 - Agricultural Single Stage - One 2022-06- Provincial de Información Para IBRD / 88670 Post Request for Bids Open - National 335,000.00 0.00 Implementat 2021-09-06 2021-09-11 2021-10-23 2021-11-22 2021-12-27 risk mitigation investments Envelope 25 La Gestión del Riesgo ion Agrario". Neuquén. AR-UCAR-216712-CW-RFB / Subproyecto "Readecuación de Pending Component 2 - Agricultural Single Stage - One 2022-05- Los sistemas de Riego IBRD / 88670 Post Request for Bids Open - National 5,800,000.00 0.00 Implementat 2021-08-02 2021-08-07 2021-09-18 2021-10-18 2021-11-22 risk mitigation investments Envelope 21 superficiales de San Blas de ion Los Sauces". La Rioja. AR-UCAR-216700-CW-RFB / Subproyecto "Fortalecimiento de la Cadena Productiva de National Pequeños Productores Procurement Pending Component 2 - Agricultural Single Stage - One 2022-06- Hortícolas y Florícolas"- IBRD / 88670 Post Request for Bids Open - National Document - 1 2,470,146.00 0.00 Implementat 2021-09-06 2021-09-11 2021-10-23 2021-11-22 2021-12-27 risk mitigation investments Envelope 25 Construcción de invernaderos Envelope process ion y mejora de la (Non Bank-SPD) comercialización. Provincia de Jujuy. AR-UCAR-186653-CW-RFB / Subproyecto "Rehabilitación National de la dinámica hidráulica del Procurement Pending subsistema de la Cuenca del Component 2 - Agricultural Single Stage - One 2022-02- IBRD / 88670 Post Request for Bids Open - National Document - 1 9,726,000.00 0.00 Implementat 2021-05-03 2021-05-03 2021-06-14 2021-07-12 2021-08-16 Arroyo Baí" - Readecuación risk mitigation investments Envelope 14 Envelope process ion de los escurrimientos de la (Non Bank-SPD) Cuenca del Arroyo Baí - Provincia de Corrientes AR-UCAR-216698-CW-RFB / Subproyecto "Desarrollo National Ganadero de la Provincia de Procurement Pending Jujuy (Etapa I)". Mejoramiento Component 2 - Agricultural Single Stage - One 2022-05- IBRD / 88670 Post Request for Bids Open - National Document - 1 2,700,000.00 0.00 Implementat 2021-08-02 2021-08-07 2021-09-18 2021-10-18 2021-11-22 en los sistemas productivos y risk mitigation investments Envelope 21 Envelope process ion la generación de nueva (Non Bank-SPD) estructura de faena . Provincia de Jujuy. AR-UCAR-216714-CW-RFB / Subproyecto "Rehabilitación de la dinámica hídrica de la National cuenca alta del Riachuelo: Procurement Pending Component 2 - Agricultural Single Stage - One 2022-05- subsistema de La Palmira" - IBRD / 88670 Post Request for Bids Open - National Document - 1 3,100,000.00 0.00 Implementat 2021-08-02 2021-08-07 2021-09-18 2021-10-18 2021-11-22 risk mitigation investments Envelope 21 Construcción de un sistema Envelope process ion de vertedero de excedentes (Non Bank-SPD) hídricos . Provincia de Corrientes. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 AR-UCAR-94920-GO-DIR / Plataforma de Integración, Component 1 - Validación y publicación de IBRD / 88670 Strengthening agro-climatic Prior Direct Selection Direct 1,800,000.00 1,509,027.90 Signed 2019-04-15 2019-09-02 2019-04-20 2019-09-03 2019-05-25 2019-09-26 2021-05-14 Información information systems Agrometeorológica AR-UCAR-94928-GO-RFB / Component 1 - Adquisición de instrumentos y Single Stage - One IBRD / 88670 Strengthening agro-climatic Post Request for Bids Open - International 240,000.00 0.00 Canceled 2019-05-15 2019-05-20 2019-07-01 2019-07-31 2019-09-04 2020-03-02 emplazamiento de estaciones Envelope information systems meteorológicas AR-UCAR-94931-GO-RFB / Adquisición y Actualización Component 1 - Under Tecnológica (Hardware - Single Stage - One IBRD / 88670 Strengthening agro-climatic Post Request for Bids Open - National 150,000.00 0.00 Implementati 2020-09-10 2021-01-28 2020-09-17 2020-10-29 2020-11-26 2020-12-31 2021-07-01 Software) para Puesta en Envelope information systems on Producción. Convenio MFI - SMN - MAGyP AR-UCAR-186695-GO-DIR / Component 1 - Pending Repuestos Radares - IBRD / 88670 Strengthening agro-climatic Post Direct Selection Direct 230,000.00 0.00 Implementati 2021-03-20 2022-03-20 Convenio MAGyP - INTA information systems on AR-UCAR-216745-GO-RFB / Convenio CONAE - Component 1 - Pending Single Stage - One Adquisición de sistema de IBRD / 88670 Strengthening agro-climatic Post Request for Bids Open - National 614,000.00 0.00 Implementati 2021-02-05 2021-02-10 2021-03-24 2021-04-23 2021-05-28 2021-11-24 Envelope discos para almacenamiento information systems on de red de alta AR-UCAR-216747-GO-RFB / Convenio CONAE - Adquisición de un sistema de Component 1 - Pending antena para recepción y Single Stage - One IBRD / 88670 Strengthening agro-climatic Post Request for Bids Open - International 350,000.00 0.00 Implementati 2021-02-05 2021-02-10 2021-03-24 2021-04-23 2021-05-28 2021-11-24 adquisición de Envelope information systems on datos satelitales de observación de la tierra en banda L y X. AR-UCAR-216754-GO-RFB / Convenio MAGyP - INTA - Component 1 - Pending Adquisición de equipamiento Single Stage - One IBRD / 88670 Strengthening agro-climatic Post Request for Bids Open - National 110,000.00 0.00 Implementati 2021-05-03 2021-05-08 2021-06-19 2021-07-19 2021-08-23 2022-02-19 Informatico Sistema Back up / Envelope information systems on storage / procesamiento (Hardware y software) Component 3 - Agricultural AR-UCAR-216771-GO-RFQ / Pending Emergency Response Request for Single Stage - One Fortalecimiento Informático IBRD / 88670 Post Open - National 25,000.00 0.00 Implementati 2021-11-20 2022-01-15 2022-07-14 Financing and Transfer of Quotations Envelope MAGYP y Provincias (3.1.1.3) on Agroclimatic Risks AR-UCAR-224910-GO-RFB / Pending Component 2 - Agricultural Single Stage - One Ocho (8) Camionetas tipo pick IBRD / 88670 Post Request for Bids Open - National 320,000.00 0.00 Implementati 2021-05-03 2021-05-08 2021-06-19 2021-07-19 2021-08-23 2022-02-19 risk mitigation investments Envelope up doble cabina on AR-UCAR-226703-GO-RFB / Pending Component 2 - Agricultural Single Stage - One ELMI - Adquisición de IBRD / 88670 Post Request for Bids Open - National 212,000.00 0.00 Implementati 2021-07-01 2021-07-06 2021-08-17 2021-09-16 2021-10-21 2022-04-19 risk mitigation investments Envelope reservorios y parcelas on AR-UCAR-231943-GO-RFQ / Component 1 - Pending Request for Single Stage - One Placas de telemetría 3G - IBRD / 88670 Strengthening agro-climatic Post Open - National 49,368.00 0.00 Implementati 2021-05-15 2021-07-10 2022-01-06 Quotations Envelope Bolsa de Cereales Entre Ríos information systems on AR-UCAR-231949-GO-RFB / Component 1 - Pending Estaciones Meteorológicas Single Stage - One IBRD / 88670 Strengthening agro-climatic Post Request for Bids Open - National 140,000.00 0.00 Implementati 2021-05-10 2021-05-15 2021-06-26 2021-07-26 2021-08-30 2022-02-26 Automáticas (EMA) - provincia Envelope information systems on de Formosa AR-UCAR-186660-GO-RFQ / Adquisición de instrumentos Component 1 - Pending para estaciones Single Stage - One IBRD / 88670 Strengthening agro-climatic Post Request for Bids Open - National 326,000.00 0.00 Implementati 2021-06-14 2021-06-19 2021-07-31 2021-08-30 2021-10-04 2022-04-02 meteorológicas Envelope information systems on convencionales - Convenio MAGyP - INTA AR-UCAR-240328-GO-RFQ / Equipamiento informático - Component 1 - Pending Request for Single Stage - One Fortalecimiento interno IBRD / 88670 Strengthening agro-climatic Post Open - National 20,000.00 0.00 Implementati 2021-07-06 2021-08-31 2022-02-27 Quotations Envelope Oficina de Riesgo information systems on Agropecuario AR-UCAR-186688-GO-DIR / Component 1 - Pending Actualización Antenas. IBRD / 88670 Strengthening agro-climatic Post Direct Selection Direct 570,000.00 0.00 Implementati 2020-09-09 2020-09-16 2021-10-04 2022-05-23 Convenio MAGyP - INTA information systems on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UCAR-216769-CS-CQS / Contratación de firma consultora /universidad Component 3 - Agricultural Consultant especialista en programación Emergency Response Pending IBRD / 88670 Post Qualification Open - National 21,500.00 0.00 2021-04-01 2021-04-22 2021-06-05 2021-07-05 2021-08-09 2022-02-05 web para plataforma de carga Financing and Transfer of Implementation Selection y consulta base histórica de Agroclimatic Risks Emergencia Agropecuaria.3.1.1.1 y 3.1.1.2 Page 2 AR-UCAR-216775-CS-CQS / Contratación de firma consultora especialista en programación de sistemas Component 3 - Agricultural para la publicación web de Consultant Emergency Response Pending herramientas de monitoreo y IBRD / 88670 Post Qualification Open - National 40,000.00 0.00 2021-04-05 2021-04-26 2021-06-09 2021-07-09 2021-08-13 2022-02-09 Financing and Transfer of Implementation gestión de riesgos, desarrollo Selection Agroclimatic Risks y publicación de Índices climáticos e informes de estudios técnicos. 3.1.6.1 y 3.1.6.2. AR-UCAR-216770-CS-CQS / Contratación de firma Component 3 - Agricultural Consultant consultora/universidad para Emergency Response Pending IBRD / 88670 Post Qualification Open - National 50,000.00 0.00 2021-04-06 2021-04-27 2021-06-10 2021-07-10 2021-08-14 2022-02-10 diseño de estrategia de Financing and Transfer of Implementation Selection financiamiento de riesgos. Agroclimatic Risks 3.1.5.1 AR-UCAR-226701-CS-CQS / Consultant Component 2 - Agricultural Pending ELMI - Desarrollo de una app IBRD / 88670 Post Qualification Open - National 10,000.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 risk mitigation investments Implementation en gestión del conocimiento Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UCAR-186662-CS-INDV Individual / Contratación Consultor/a Component 2 - Agricultural Pending IBRD / 88670 Post Consultant Open 9,285.70 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 Especialista en Ingeniería Civil risk mitigation investments Implementation Selection para Formulación de Proyectos AR-UCAR-186673-CS-INDV / Contratación Consultor/a Individual Component 2 - Agricultural Pending Especialista en Formulación y IBRD / 88670 Post Consultant Open 7,000.00 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 risk mitigation investments Implementation Evaluación Económica de Selection Proyectos AR-UCAR-186678-CS-INDV Individual / Contratación Consultor/a Component 2 - Agricultural Pending IBRD / 88670 Post Consultant Open 9,285.70 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 especialista ambiental para risk mitigation investments Implementation Selection formulación de proyectos AR-UCAR-186680-CS-INDV / Contratación Consultor/a Individual Component 2 - Agricultural Pending especialista en afectación de IBRD / 88670 Post Consultant Open 6,964.30 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 risk mitigation investments Implementation activos para formulación de Selection proyecto AR-UCAR-186681-CS-INDV / Contratación Consultor/a Individual Component 2 - Agricultural Pending especialista en pueblos IBRD / 88670 Post Consultant Open 6,964.30 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 risk mitigation investments Implementation indígenas para formulación de Selection proyecto AR-UCAR-186676-CS-INDV / Contratación 3 Individual Consultores/as especialistas Component 2 - Agricultural Pending IBRD / 88670 Post Consultant Open 36,000.00 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 en conectividad rural y risk mitigation investments Implementation Selection sistemas de información para formulación de proyectos Component 3 - Agricultural Individual AR-UCAR-186683-CS-INDV Emergency Response IBRD / 88670 Post Consultant Open 5,285.70 0.00 Canceled 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 / Contratración de Data Entry Financing and Transfer of Selection Agroclimatic Risks AR-UCAR-186685-CS-INDV / Contratación de 4 Component 3 - Agricultural Individual Especialistas, Master o Doctor Emergency Response IBRD / 88670 Post Consultant Open 59,214.30 0.00 Canceled 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 en economía agropecuaria y Financing and Transfer of Selection finanzas públicas.- Buenos Agroclimatic Risks Aires AR-UCAR-186687-CS-CDS / Buenos Aires- Comité Técnico Component 2 - Agricultural Pending de Evaluación de IBRD / 88670 Post Direct Selection Direct 74,000.00 0.00 2021-04-01 2021-04-11 2021-06-15 2021-12-12 risk mitigation investments Implementation Subproyectos - Contrato Servicios de Consultoría IICA AR-UCAR-216774-CS-INDV Component 3 - Agricultural / Especialista en economía Individual Emergency Response Pending agraria para estudio de IBRD / 88670 Post Consultant Open 6,224.00 0.00 2021-05-03 2021-06-21 2021-07-12 2021-08-16 2022-02-12 Financing and Transfer of Implementation prefactibilidad para seguro en Selection Agroclimatic Risks Ganadería AR-UCAR-216778-CS-INDV / Contratación de un Component 3 - Agricultural Individual consultor/ra especialista en Emergency Response Pending IBRD / 88670 Post Consultant Open 15,000.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 seguros para adecuación Financing and Transfer of Implementation Selection póliza seguro horticola. Agroclimatic Risks 3.2.2.2. AR-UCAR-216779-CS-INDV / Contratación de un Component 3 - Agricultural Individual consultor/ra especialista en Emergency Response Pending IBRD / 88670 Post Consultant Open 15,000.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 abogacía y/o administración Financing and Transfer of Implementation Selection publica para proceso de Agroclimatic Risks adquisición seguro. 3.2.2.3 AR-UCAR-216780-CS-INDV / Contratación de 2 consultores/as profesionales Component 3 - Agricultural en agronomía, economía Individual Emergency Response Pending agraria o actuarios con IBRD / 88670 Post Consultant Open 30,000.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 Financing and Transfer of Implementation conocimientos y experiencia Selection Agroclimatic Risks en seguros agropecuarios. Estudio de Factibilidad seguro sequía en Santa Fé. 3.2.3.1 Page 3 AR-UCAR-216761-CS-INDV / Convenio INTA - Component 1 - Individual Contratación de 1 Pending IBRD / 88670 Strengthening agro-climatic Post Consultant Open 27,000.00 0.00 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2022-02-09 Especialista, Master o Doctor Implementation information systems Selection en agronomia, SIG, Teledetección.- Buenos Aires AR-UCAR-216756-CS-INDV Component 1 - Individual / Convenio INTA - Pending IBRD / 88670 Strengthening agro-climatic Post Consultant Open 72,000.00 0.00 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2022-02-09 Contratración de 2 Implementation information systems Selection Programadores AR-UCAR-216760-CS-INDV Component 1 - Individual / Convenio INTA - Pending IBRD / 88670 Strengthening agro-climatic Post Consultant Open 36,000.00 0.00 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2022-02-09 Contratración de 1 Ing. Implementation information systems Selection Electrónico AR-UCAR-186682-CS-INDV Component 3 - Agricultural Individual / Contratración de 2 Emergency Response Pending IBRD / 88670 Post Consultant Open 14,857.10 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 Programador web Symfony Financing and Transfer of Implementation Selection SENIOR (Front-Backend) Agroclimatic Risks Component 3 - Agricultural AR-UCAR-216772-CS-INDV Individual Emergency Response Pending / Especialista en economía IBRD / 88670 Post Consultant Open 7,780.00 0.00 2021-05-03 2021-06-21 2021-07-12 2021-08-16 2022-02-12 Financing and Transfer of Implementation agraria/seguros Selection Agroclimatic Risks Component 3 - Agricultural AR-UCAR-216776-CS-INDV Individual Emergency Response Pending / Contratación de un actuario. IBRD / 88670 Post Consultant Open 15,000.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-03-13 Financing and Transfer of Implementation 3.2.1.1 Selection Agroclimatic Risks AR-UCAR-216762-CS-INDV / Especialista SIG- Teledetección con formación Component 1 - Individual en geografía o ciencias Pending IBRD / 88670 Strengthening agro-climatic Post Consultant Open 6,224.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-03-13 ambientales/sociales para Implementation information systems Selection monitoreo de eventos extremos con impacto agroproductivo AR-UCAR-216763-CS-INDV / Convenio INTA - Component 1 - Individual Pending Contratración de IBRD / 88670 Strengthening agro-climatic Post Consultant Open 24,000.00 0.00 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2022-02-09 Implementation Administrador datos - Data information systems Selection Entry AR-UCAR-225069-CS-INDV Individual / Contratación de cuatro (4) Component 2 - Agricultural Pending IBRD / 88670 Post Consultant Open 29,045.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 Consultores Especialistas en risk mitigation investments Implementation Selection Riego AR-UCAR-226535-CS-INDV / ELMI - 6 consultores/as en Individual Ingeniería Agrónoma o Component 2 - Agricultural Pending IBRD / 88670 Post Consultant Open 37,000.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 Técnicos/as Universitarios/as risk mitigation investments Implementation Selection en Sistemas de Riego o carreras afines AR-UCAR-227311-CS-INDV Component 1 - Individual / Especialista en Ciencias Pending IBRD / 88670 Strengthening agro-climatic Post Consultant Open 8,714.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-03-13 Ambientales-Cambio Implementation information systems Selection climático AR-UCAR-227312-CS-INDV Component 1 - Individual / Especialista en hidrología Pending IBRD / 88670 Strengthening agro-climatic Post Consultant Open 3,112.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 para cálculo de precipitación Implementation information systems Selection por satélites AR-UCAR-227313-CS-INDV / Especialista informático con Component 1 - Individual conocimiento agropecuario Pending IBRD / 88670 Strengthening agro-climatic Post Consultant Open 6,224.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-03-13 para estudio de prefactibilidad Implementation information systems Selection de Sistema de datos de daños y pérdidas AR-UCAR-227314-CS-INDV Individual Component 2 - Agricultural Pending / Cuatro (4) Consultores IBRD / 88670 Post Consultant Open 29,045.00 0.00 2021-05-03 2021-06-21 2021-07-12 2021-08-16 2022-02-12 risk mitigation investments Implementation Especialistas en Riego Selection AR-UCAR-227315-CS-INDV / Dos (2) Consultores/as Individual Component 2 - Agricultural Pending Economistas o idóneos IBRD / 88670 Post Consultant Open 19,087.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 risk mitigation investments Implementation especialistas en evaluación Selection económica de proyectos AR-UCAR-227316-CS-INDV / Dos (2) Consultores/as Individual Component 2 - Agricultural Pending Especialistas en Formulación IBRD / 88670 Post Consultant Open 19,087.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 risk mitigation investments Implementation de proyectos con Selection financiamiento internacional AR-UCAR-227318-CS-INDV / Cuatro (4) Consultores/as Individual Component 2 - Agricultural Pending Especialistas en Ingeniería IBRD / 88670 Post Consultant Open 38,174.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 risk mitigation investments Implementation Civil para Formulación de Selection Proyectos AR-UCAR-227319-CS-INDV / Cuatro (4) Consultores/as Individual Especialistas Socio- Component 2 - Agricultural Pending IBRD / 88670 Post Consultant Open 38,174.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 ambientales para la risk mitigation investments Implementation Selection Formulación de Proyectos con financiamiento internacional AR-UCAR-227320-CS-INDV / Dos (2) Consultores/as en Individual Component 2 - Agricultural Pending Ingeniaría Agrónoma o IBRD / 88670 Post Consultant Open 19,087.00 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 risk mitigation investments Implementation especialistas idóneos en Selection producción rural Page 4 AR-UCAR-216777-CS-INDV / Contratación de dos Component 3 - Agricultural Individual consultores/as agronomos Emergency Response Pending IBRD / 88670 Post Consultant Open 20,000.00 0.00 2021-05-01 2021-06-19 2021-07-10 2021-08-14 2022-02-10 especialistas en horticultura Financing and Transfer of Implementation Selection para relevamiento sector Agroclimatic Risks horticola BsAs (3.2.2.1) AR-UCAR-226536-NC-DIR / ELMI - Diplomatura en Riego y Component 2 - Agricultural Pending IBRD / 88670 Post Direct Selection Direct 30,000.00 0.00 2021-05-03 2021-05-13 2021-07-17 2022-01-13 Drenaje. Universidad Nacional risk mitigation investments Implementation de Cuyo AR-UCAR-226709-CS-CDS / Convenio CONAE - Component 1 - Contratación de firma Pending IBRD / 88670 Strengthening agro-climatic Prior Direct Selection Direct 1,325,000.00 0.00 2021-06-14 2021-06-24 2021-08-28 2022-02-24 consultora para desarrollo de Implementation information systems productos, distribución y capacitación AR-UCAR-216781-CS-INDV / Contratación de consultor Component 1 - Individual Pending Especialista en Comunicación IBRD / 88670 Strengthening agro-climatic Post Consultant Open 10,000.00 0.00 2021-06-28 2021-08-16 2021-09-06 2021-10-11 2022-04-09 Implementation para difusión de acciones y information systems Selection alcances del Programa AR-UCAR-240331-CS-INDV / Contratación de Analista Component 1 - Individual Funcional para los sistemas Pending IBRD / 88670 Strengthening agro-climatic Post Consultant Open 7,000.00 0.00 2021-06-28 2021-08-16 2021-09-06 2021-10-11 2022-04-09 existentes en sitio web de la Implementation information systems Selection Oficina de Riesgo Agropecuario (ORA) Page 5 PROCUREMENT PLAN (Textual Part) Project information: Rwanda Renewable Energy Fund (REF) Project (P160699) Project Implementation agency: Development Bank of Rwanda (BRD) Date of the Procurement Plan: January 22, 2018 Period covered by this Procurement Plan: January 2018 – December 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. All Consultancy Services shall be procured following Procurement Regulations and Bank’s SPDs. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Law of Rwanda, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable. Thresholds*, Procurement Methods, and Prior Review Goods, Works, and Non-Consulting Services Method of Procurement Thresholds for Method (US$ equivalent) Open International (Goods) Equal to or more than US$ 2 million Open National (Goods) – Open < US$2 million and > US$ 2,500 Tender as per Ministerial Order 2014 RFQ (Goods) Less than US$ 2,500 or as stipulated in Rwanda Procurement Regulations Open International (Works) Equal to or more than US$ 10 million Open National (Works) - Open Less than US$ 10 million Tender as per Ministerial Order 2014 RFQ (works) Less than US$ 2,500 or as stipulated in Rwanda Procurement Regulations Open International (Non-consulting Equal to or More than US$ 2 million Services) Open National (Non-consulting Less than US$ 2 million Services) - Open Tender as per Ministerial Order 2014 Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants need, results based arrangements. It is not expected that there will need for prequalification in the procurement arrangements under Rwanda Pilot Program for Climate Resilience project) Thresholds for selection of consultant Prior Review Thresholds: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than US$ 1 million. (b). Individual Consultant: all procurements estimated to cost more than US$ 0.3 million The short list may consist of all National consultants in case the estimated cost is less than US$ 200,000 per contract. PROCUREMENT Rwanda : Renewable Energy Fund PLAN General Information Country: Rwanda Bank’s Approval Date of the Original Procurement Plan: 2018-01-23 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160699 GPN Date: Project Name: Renewable Energy Fund Loan / Credit No: TF / A4990 Development Bank of Rwanda Ltd Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Technical Assistance, RW-BRD-44062-CS-QCBS / Quality And Cost- TF / A4990 Capacity Building, and Project Prior Open - International 330,000.00 277,750.00 Signed 2018-01-29 2018-02-02 2018-02-19 2018-02-20 2018-04-04 2018-08-14 2018-05-02 2018-09-14 2018-06-01 2019-02-14 2018-07-06 2019-06-19 2018-08-10 2019-06-20 2019-08-10 Capacity building of SACCOs Based Selection Implementation Support Technical Assistance, RW-BRD-47798-CS-CQS / Quality And Cost- TF / A4990 Capacity Building, and Project Prior Open - International 300,000.00 252,947.49 Signed 2018-03-22 2018-04-17 2018-04-12 2018-05-14 2018-05-26 2018-12-07 2018-06-23 2019-01-10 2018-07-23 2019-04-18 2018-08-27 2019-07-12 2018-10-01 2019-07-03 2019-10-01 Public awareness campain Based Selection Implementation Support RW-BRD-80709-CS-QCBS / Developping a Monitoring, Technical Assistance, Quality And Cost- Evaluation and Learning plan TF / A4990 Capacity Building, and Project Post Open - National 55,000.00 44,190.00 Completed 2018-10-31 2018-10-25 2018-11-21 2019-01-04 2019-02-27 2019-02-01 2019-03-08 2019-03-03 2019-04-09 2019-04-07 2019-04-26 2019-05-12 2019-06-25 2019-08-10 2020-04-28 Based Selection and capacity building for the Implementation Support REF INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Technical Assistance, Individual RW-BRD-44081-CS-INDV / TF / A4990 Capacity Building, and Project Prior Consultant Open 120,000.00 189,240.00 Signed 2018-01-29 2018-02-02 2018-03-19 2018-04-09 2018-12-11 2018-05-14 2019-01-03 2019-05-09 Senior Financial Advisor Implementation Support Selection RW-BRD-44085-CS-INDV / Technical Assistance, Individual Social and Environmental TF / A4990 Capacity Building, and Project Post Consultant Open 5,000.00 0.00 Canceled 2018-01-29 2018-01-31 2018-03-19 2018-04-09 2018-05-14 2018-11-10 Specialist Implementation Support Selection RW-BRD-52554-CS-INDV / Technical Assistance, Individual Recruitment of Investment TF / A4990 Capacity Building, and Project Post Consultant Open 27,000.00 2,504.08 Signed 2018-03-07 2018-03-28 2018-04-25 2019-04-10 2018-05-16 2019-04-11 2018-06-20 2019-04-11 2019-06-20 Officer Implementation Support Selection Technical Assistance, Individual RW-BRD-52607-CS-INDV / TF / A4990 Capacity Building, and Project Post Consultant Open 27,000.00 29,946.99 Signed 2018-03-07 2018-04-04 2018-04-25 2018-03-12 2018-05-16 2018-03-12 2018-06-20 2018-04-25 2019-06-20 Contract Drafting Officer Implementation Support Selection Technical Assistance, Individual RW-BRD-52610-CS-INDV / TF / A4990 Capacity Building, and Project Post Consultant Open 27,000.00 25,992.97 Signed 2018-03-07 2018-03-28 2018-04-25 2018-06-07 2018-05-16 2018-06-20 2018-06-20 2018-07-09 2019-06-20 Accountant Implementation Support Selection Technical Assistance, Individual RW-BRD-52616-CS-INDV / TF / A4990 Capacity Building, and Project Post Consultant Open 27,000.00 26,659.14 Signed 2018-03-07 2018-04-04 2018-04-25 2018-07-09 2018-05-16 2018-10-25 2018-06-20 2018-11-01 2019-06-20 Financial Reporting Officer Implementation Support Selection Technical Assistance, Individual RW-BRD-52618-CS-INDV / TF / A4990 Capacity Building, and Project Post Consultant Open 27,000.00 1,419.87 Signed 2018-03-07 2019-10-11 2018-04-25 2019-04-05 2018-05-16 2019-04-05 2018-06-20 2019-05-02 2019-06-20 Credit Risk Officer Implementation Support Selection Technical Assistance, Individual RW-BRD-52650-CS-INDV / TF / A4990 Capacity Building, and Project Post Consultant Limited 1,666.00 1.81 Completed 2018-06-28 2018-05-04 2018-07-03 2018-05-04 2018-07-24 2018-08-02 2018-08-28 2018-09-19 2019-08-28 2020-09-18 Mini-Technical Specialist 1 Implementation Support Selection Technical Assistance, Individual RW-BRD-54310-CS-INDV / TF / A4990 Capacity Building, and Project Post Consultant Open 1,666.00 1,813.27 Signed 2018-03-15 2018-05-04 2018-05-03 2018-10-02 2018-05-24 2018-08-02 2018-06-28 2018-09-19 2019-06-28 Mini grid technical Expert 2 Implementation Support Selection RW-BRD-52602-CS-INDV / Technical Assistance, Individual Recrutment of Technology TF / A4990 Capacity Building, and Project Prior Consultant Open 60,000.00 2,485.55 Signed 2018-03-27 2018-04-03 2018-05-15 2018-06-05 2018-11-21 2018-07-10 2018-11-29 2019-07-10 Officer Implementation Support Selection RW-BRD-72105-CS-INDV / Technical Assistance, Individual Hiring an Environmental and TF / A4990 Capacity Building, and Project Post Consultant Limited 2,500.00 2,756.20 Signed 2018-08-13 2018-08-28 2018-08-18 2018-09-05 2018-09-08 2018-09-12 2018-10-13 2018-09-05 2019-10-13 Social Safeguards Specialist 2 Implementation Support Selection Page 1 RW-BRD-72106-CS-INDV / Technical Assistance, Individual Hiring an Environmental and TF / A4990 Capacity Building, and Project Post Consultant Limited 2,500.00 2,756.20 Completed 2018-08-13 2018-08-28 2018-08-18 2018-09-05 2018-09-08 2019-04-29 2018-10-13 2018-09-05 2019-10-13 2020-10-05 Social Safeguards Implementation Support Selection RW-BRD-72235-CS-CDS / Technical Assistance, Hiring a consultant to TF / A4990 Capacity Building, and Project Post Direct Selection Direct 40,000.00 0.00 Canceled 2018-08-13 2018-08-23 2018-10-27 2018-12-11 appraise banks Implementation Support RW-BRD-72235-CS-CDS-2 / Technical Assistance, Hiring a consultant to TF / A4990 Capacity Building, and Project Post Direct Selection Direct 40,000.00 28,588.00 Completed 2019-01-31 2019-01-01 2019-01-31 2019-01-15 2019-02-05 2019-02-04 2019-03-07 2020-02-28 appraise banks Implementation Support RW-BRD-136112-CS-CDS / Technical Assistance, CREATION OF ORACLE ERP – TF / A4990 Capacity Building, and Project Post Direct Selection Direct 28,000.00 28,000.00 Signed 2019-10-09 2019-10-21 2019-10-19 2019-10-23 2019-11-18 2020-03-05 2020-02-16 FINANCE FOR REF PROJECT Implementation Support RW-BRD-234551-CS-INDV / Technical Assistance, Individual Hiring a Senior financial Under TF / A4990 Capacity Building, and Project Post Consultant Open 117,600.00 0.00 2021-05-17 2021-05-25 2021-06-26 2021-07-10 2021-08-07 2022-08-07 advisor to support the REF Implementation Implementation Support Selection project RW-BRD-234553-CS-INDV / Hiring an expert to support Technical Assistance, Individual coordination of verification Under TF / A4990 Capacity Building, and Project Post Consultant Open 135,240.00 0.00 2021-08-09 2021-05-28 2021-08-30 2021-09-20 2021-10-18 2022-10-18 and facilitate knowledge Implementation Implementation Support Selection transfer from propoor to window 5 staff. RW-BRD-234555-CS-INDV / Technical Assistance, Individual Under Hiring the REF technology TF / A4990 Capacity Building, and Project Post Consultant Open 30,250.00 0.00 2021-05-30 2021-05-26 2021-07-09 2021-07-23 2021-08-20 2021-09-25 Implementation officer Implementation Support Selection Technical Assistance, Individual RW-BRD-234557-CS-INDV / Under TF / A4990 Capacity Building, and Project Post Consultant Open 30,250.00 0.00 2021-05-30 2021-05-26 2021-07-09 2021-07-23 2021-08-20 2022-08-20 Hiring the REF M&E officer Implementation Implementation Support Selection RW-BRD-234558-CS-INDV / Technical Assistance, Individual Under Hiring the REF investment TF / A4990 Capacity Building, and Project Post Consultant Open 30,250.00 0.00 2021-06-30 2021-05-26 2021-08-09 2021-08-23 2021-09-20 2022-09-20 Implementation officer Implementation Support Selection RW-BRD-234560-CS-INDV / Technical Assistance, Individual Under Hiring of REF investment TF / A4990 Capacity Building, and Project Post Consultant Open 30,250.00 0.00 2021-06-30 2021-05-26 2021-08-02 2021-08-23 2021-09-20 2022-09-20 Implementation officer for window 5 - 1 Implementation Support Selection RW-BRD-234561-CS-INDV / Technical Assistance, Individual Under Hiring of REF investment TF / A4990 Capacity Building, and Project Post Consultant Open 30,250.00 0.00 2021-06-30 2021-05-26 2021-08-02 2021-08-23 2021-09-20 2022-09-20 Implementation officer for window 5 -2 Implementation Support Selection Technical Assistance, Individual RW-BRD-54319-CS-INDV / TF / A4990 Capacity Building, and Project Post Consultant Open 1,668.00 0.00 Canceled 2018-03-15 2018-05-03 2018-05-24 2018-06-28 2019-06-28 Mini grid technical expert 3 Implementation Support Selection RW-BRD-237743-CS-CDS / Hiring a consultant firm to Technical Assistance, Pending provide maintenance and TF / A4990 Capacity Building, and Project Post Direct Selection Direct 47,040.00 0.00 2021-08-19 2021-08-29 2021-10-17 2022-10-17 Implementation upgrade services of the REF Implementation Support MEL Page 2 Procurement Plan I. General 1. Project Information Country: Tanzania Project Name: Resilient Natural Resources Management for Growth Project Project ID: P150523 2. Project Implementation Agency: Ministry of Natural Resources and Tourism (MNRT) Tanzania National Parks (TANAPA) Tanzania Wildlife Management Authority (TAWA) National Irrigation Commission (NIrC) Rufiji Basin Water Board (RBWB) 3. Date of the Procurement Plan: June 2017 4. Period Covered by this Procurement Plan: First 18 Months Procurement Plan II. Thresholds for Prior Review, Procurement Approaches and Methods A. Goods, Works and Non-Consulting Services Procurement Approaches and Methods (US$ Prior Review millions) Category (US$ Open Open Request for millions) International National Quotation (RfQ) Works ≥5 ≥ 15.0 < 15 < 0.2 Goods, IT, and non- ≥1.5 ≥5 <5 < 0.1 consulting services B. Consulting Services Category Prior Review Short List of National Consultants (US$ (US$ million) millions) Consulting Engineering and Services Construction Supervision Consultants ≥ 0.5 <0.3 < 0.3 (Firms) Individual ≥ 0.2 NA. NA. 1 Consultants [Overall Project Procurement Risk is HIGH] Notes: Terms of Reference: Terms of Reference for all contracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Consultancy Service for Contracts estimated to cost US$ 300,000 equivalent and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of wide circulation and/or Regional News Paper(s). 2 III. Packages for Goods, Works and Non-Consulting Services Sr./ No Contract Description Estimate Review Market Selection Evaluation Procurement Prequa Domesti Expected Expected d Cost by Bank Approach Method Options Process: lificatio c date of date of (US$) (Prior/Pos (Open- (RFP, RFB, (BAFO, (Single/Multipl n Preferen bid/ Contract t) National/ RFQ, DS Rated e Stages; (Yes/ ce proposal Signature International etc.) Criteria One/Two No) (Yes/No) opening Limited etc.) etc.) Envelopes etc) Goods Works Non-Consulting Services 3 I. Packages for Consulting Services Sr. No Contract Description Estimated Review Market Selection Shortlisti Expected date of Expected date Cost (US$) by Bank Approach Method ng bid/ proposal of Contract (Prior/Pos (Open- (QCBS, FBBS, (Yes/ No) opening Signature t) National/ LCBS, QBS, International CQS, DS etc.) Limited etc.) 4 PROCUREMENT Tanzania : Tanzania: Resilient Natural Resource Management for Tourism and Growth PLAN General Information Country: Tanzania Bank’s Approval Date of the Original Procurement Plan: 2017-06-07 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150523 GPN Date: 2018-08-17 Project Name: Tanzania: Resilient Natural Resource Management for Tourism and Growth Loan / Credit No: IDA / Q9740, IDA / 61430 M Executing Agency(ies): inistry of Natural Resources and Tourism WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 4. Project management, TZ-MNRT-16999-GO-RFQ / institutional strengthening, Request for Single Stage - One Procurement of Printers and IDA / Q9740 quality assurance and Post Open - National 20,000.00 7,222.94 Completed 2017-06-11 2017-07-09 2019-04-10 2018-01-05 2019-05-01 Quotations Envelope Computers control, and monitoring and evaluation 4. Project management, TZ-MNRT-40866-GO-RFQ / institutional strengthening, Request for Single Stage - One Supply of IT Equipment for IDA / 61430 quality assurance and Post Open - National 80,000.00 0.00 Canceled 2018-02-11 2018-04-08 2018-10-05 Quotations Envelope PCU and M&E control, and monitoring and evaluation 4. Project management, TZ-MNRT-40876-GO-DIR / institutional strengthening, License for financial IDA / 61430 quality assurance and Post Direct Selection Direct 15,000.00 0.00 Canceled 2018-01-28 2018-02-02 2018-03-09 2018-09-05 management control, and monitoring and evaluation TZ-MNRT-82691-GO-UN / 4. Project management, Procurement of Motor institutional strengthening, UN Agencies Vehicles for the Project IDA / 61430 quality assurance and Prior Direct 629,024.00 339,714.00 Signed 2018-10-25 2019-11-25 2018-10-30 2021-04-09 2018-12-04 2020-08-05 2019-06-02 (Direct) Coordination Unit and control, and monitoring and Implementing Agencies evaluation TZ-MNRT-129698-GO-RFQ / 4. Project management, Supply of office equipment institutional strengthening, Request for Single Stage - One and computers to support IDA / 61430 quality assurance and Post Limited 95,000.00 11,042.03 Completed 2019-09-14 2019-11-07 2019-11-09 2020-04-04 2020-05-07 2020-04-29 Quotations Envelope improvement of institution control, and monitoring and capacities evaluation 4. Project management, TZ-MNRT-130397-GO-DIR / institutional strengthening, Supply of EPICOR Licences, IDA / 61430 quality assurance and Post Direct Selection Direct 66,200.00 0.00 Canceled 2019-09-16 2019-09-21 2019-10-26 2020-04-23 Configuration and Training of control, and monitoring and users under REGROW Project evaluation TZ-MNRT-187392-GO-RFQ / 4. Project management, Supply of office equipment, institutional strengthening, Research equipment's and Request for Single Stage - One IDA / 61430 quality assurance and Post Open - National 205,674.00 0.00 Canceled 2020-08-10 2020-10-05 2021-04-03 computers to support Quotations Envelope control, and monitoring and improvement of institutional evaluation capacities- TAWIRI 4. Project management, TZ-MNRT-194866-GO-RFQ / institutional strengthening, Procurement of Moto vehicles Request for Single Stage - One IDA / 61430 quality assurance and Post Limited 80,000.00 0.00 Canceled 2020-10-03 2020-11-28 2021-05-27 for the Project Coordination Quotations Envelope control, and monitoring and Unit evaluation TZ-MNRT-187377-GO-RFQ / 4. Project management, Supply of office equipment institutional strengthening, Request for Single Stage - One and computers to support IDA / 61430 quality assurance and Post Limited 4,750.00 3,579.13 Completed 2020-09-26 2020-10-10 2020-11-21 2020-11-30 2021-05-20 2021-02-23 Quotations Envelope improvement of institutional control, and monitoring and capacities for TFS evaluation 4. Project management, TZ-MNRT-60449-GO-RFB / institutional strengthening, Request for Single Stage - One supply of office furniture's for IDA / 61430 quality assurance and Post Limited 2,950.00 2,808.79 Signed 2020-09-26 2020-09-08 2020-11-21 2021-04-16 2021-05-20 Quotations Envelope TAWIRI office control, and monitoring and evaluation 4. Project management, institutional strengthening, TZ-MNRT-195448-GO-RFQ / Request for Single Stage - One IDA / 61430 quality assurance and Post Limited 47,950.00 0.00 Canceled 2020-09-26 2020-09-06 2020-11-21 2021-05-20 Supply of ICT Equipment's Quotations Envelope control, and monitoring and evaluation TZ-MNRT-205778-GO-RFQ / 1. Strengthen management Supply of soil sampling Request for Single Stage - One IDA / 61430 and improve infrastructure in Post Limited 30,000.00 20,982.00 Signed 2020-11-25 2020-12-23 2021-01-20 2021-04-16 2021-07-19 equipment's and pasture Quotations Envelope priority Protected Areas meter TZ-MNRT-205782-GO-RFQ / 1. Strengthen management Request for Single Stage - One Supply of range finder, IDA / 61430 and improve infrastructure in Post Limited 30,000.00 15,415.30 Signed 2020-11-25 2020-11-30 2021-01-20 2021-04-16 2021-07-19 Quotations Envelope binocular and walker talker priority Protected Areas 1. Strengthen management TZ-MNRT-205784-GO-RFQ / Request for Single Stage - One IDA / 61430 and improve infrastructure in Post Limited 3,750.00 6,831.17 Signed 2020-11-25 2020-11-30 2021-01-20 2021-04-16 2021-07-19 supply of Sharman traps Quotations Envelope priority Protected Areas 1. Strengthen management TZ-MNRT-205786-GO-DIR / IDA / 61430 and improve infrastructure in Post Direct Selection Direct 29,609.00 18,568.33 Signed 2020-11-20 2021-02-19 2020-11-25 2020-09-04 2020-12-30 2021-04-16 2021-06-28 Supply of Animal Drugs priority Protected Areas Page 1 4. Project management, TZ-MNRT-201735-GO-RFB / institutional strengthening, Supply of Collar Equipment's IDA / 61430 quality assurance and Prior Direct Selection Direct 128,000.00 0.00 Canceled 2020-11-20 2020-11-25 2020-12-30 2021-06-28 for TAWIRI office control, and monitoring and evaluation 4. Project management, TZ-MNRT-208411-GO-DIR / institutional strengthening, Procurement of One Unit of IDA / 61430 quality assurance and Post Direct Selection Direct 80,000.00 0.00 Canceled 2020-12-07 2021-02-19 2020-12-12 2020-12-17 2021-01-16 2021-07-15 Motor vehicle for PCU control, and monitoring and evaluation 4. Project management, TZ-MNRT-226293-GO-RFQ / institutional strengthening, Under Request for Single Stage - One SUPPLY OF ICT EQUIPMENTS IDA / 61430 quality assurance and Post Limited 47,950.00 0.00 Implementati 2021-04-04 2021-04-06 2021-05-30 2021-11-26 Quotations Envelope FOR TAWIRI control, and monitoring and on evaluation 4. Project management, institutional strengthening, TZ-MNRT-228083-GO-RFQ / Request for Single Stage - One IDA / 61430 quality assurance and Post Limited 3,200.00 2,900.39 Signed 2021-01-24 2021-01-19 2021-03-21 2021-05-17 2021-09-17 Supply of Laptop for TTB Quotations Envelope control, and monitoring and evaluation 4. Project management, institutional strengthening, TZ-MNRT-228080-GO-RFQ / Request for Single Stage - One IDA / 61430 quality assurance and Post Limited 7,000.00 6,884.60 Completed 2019-05-24 2020-05-21 2019-07-19 2021-02-16 2020-01-15 2021-04-20 Supply of ICT Equipments Quotations Envelope control, and monitoring and evaluation 4. Project management, institutional strengthening, TZ-MNRT-228082-GO-RFQ / Request for Single Stage - One IDA / 61430 quality assurance and Post Limited 6,000.00 4,397.11 Completed 2019-05-24 2020-05-21 2019-07-19 2021-02-16 2020-01-15 2021-04-20 Supply of Furnitures Quotations Envelope control, and monitoring and evaluation 4. Project management, TZ-MNRT-234689-GO-DIR / institutional strengthening, Pending SUPPLY OF COLLAR IDA / 61430 quality assurance and Post Direct Selection Direct 128,000.00 0.00 Implementati 2021-05-31 2021-06-05 2021-07-10 2022-01-06 EQUIPMENT FOR TAWIRI control, and monitoring and on evaluation NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MNRT-17017-CS-QCBS / 2. Strengthen alternative Provision of consultancy livelihoods for targeted Quality And Cost- services for environmental IDA / Q9740 Prior Open - International 400,000.00 396,851.50 Signed 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-06-22 2017-06-27 2016-10-31 2018-06-27 communities in proximity to Based Selection and social impact assessment the priority Protected Areas including ESMF, RPF and PF TZ-MNRT-17022-CS-CQS / Consultancy services to conduct a curriculum 2. Strengthen alternative development workshop and Consultant livelihoods for targeted Pending elaborate a farmer field school IDA / Q9740 Post Qualification Open - National 100,000.00 0.00 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-06-27 2017-12-24 communities in proximity to Implementation program on on-farm water Selection the priority Protected Areas and crop management in the irrigation scheme on the usangu plains TZ-MNRT-17027-CS-QCBS / Provision of consultancy 3. Strengthen landscape services to undertake a management and reconnaissance study of Quality And Cost- IDA / Q9740 infrastructure investments in Prior Open - International 400,000.00 385,180.00 Signed 2017-06-06 2017-06-27 2017-06-27 2017-06-27 2017-06-27 2017-07-04 2017-10-27 2017-08-08 2016-10-30 2018-08-08 structural measure to Based Selection and upstream of the Ruaha augment dry season flows in National Park Ruaha National Park, Southern Tanzania TZ-MNRT-17052-CS-QCBS / Consultancy on locally based tourism product development 1. Strengthen management Quality And Cost- and socio- economic IDA / Q9740 and improve infrastructure in Prior Open - National 300,000.00 460,881.13 Signed 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-07-22 2017-06-27 2017-07-25 2018-06-27 Based Selection assessment of communities priority Protected Areas adjacent to selected protected areas in southern Tanzania TZ-MNRT-17054-CS-QCBS / 3. Strengthen landscape consultancy service to management and undertake a reconnaissance Quality And Cost- IDA / Q9740 infrastructure investments in Prior Open - National 380,000.00 562,591.20 Signed 2017-06-06 2017-06-23 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-06-06 2017-07-17 2017-06-27 2017-07-21 2018-06-27 survey of agricultural water Based Selection and upstream of the Ruaha management in usangu flats National Park Southern Tanzania 4. Project management, TZ-MNRT-40665-CS-QCBS / institutional strengthening, Quality And Cost- Under Market research and product IDA / 61430 quality assurance and Prior Open - National 500,000.00 0.00 2018-01-30 2018-05-13 2018-02-20 2018-06-12 2018-04-05 2019-01-22 2018-05-03 2019-02-25 2018-06-02 2019-08-01 2018-07-07 2018-08-11 2019-08-11 Based Selection Implementation market development strategy control, and monitoring and evaluation TZ-MNRT-40894-CS-CQS / Option for PPP and private 1. Strengthen management Consultant sector investment IDA / 61430 and improve infrastructure in Post Qualification Open - National 120,000.00 0.00 Canceled 2018-03-05 2018-03-26 2018-05-09 2018-06-08 2018-07-13 2019-01-09 opportunities in the project priority Protected Areas Selection area Page 2 TZ-MNRT-57587-CS-QCBS / Consultancy services for designing drawing and 1. Strengthen management Quality And Cost- preparation of bill of quantity IDA / 61430 and improve infrastructure in Post Open - National 250,000.00 0.00 Canceled 2018-04-13 2018-05-04 2018-06-17 2018-07-15 2018-08-14 2018-09-18 2018-10-23 2019-10-23 Based Selection and tender document for priority Protected Areas construction of southern circuit management center TZ-MNRT-40895-CS-CQS / The Preparation of an 2. Strengthen alternative Implementation Plan to Consultant livelihoods for targeted Develop Viable Goods and IDA / 61430 Post Qualification Open - National 250,000.00 0.00 Canceled 2018-02-06 2018-02-27 2018-09-19 2018-04-12 2018-05-12 2018-06-16 2018-12-13 communities in proximity to Services Supply Capacity in Selection the priority Protected Areas Selected Communities under the REGROW Project INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MNRT-17056-CS-INDV / undertaking of an assessment 2. Strengthen alternative of current benefit sharing Individual livelihoods for targeted models associated with with IDA / Q9740 Post Consultant Open 30,000.00 31,500.00 Signed 2017-06-06 2016-01-15 2017-06-06 2016-08-15 2017-06-06 2016-10-10 2017-06-27 2016-10-20 2017-12-24 communities in proximity to natural resources and tourism Selection the priority Protected Areas and lesson learned from best practises 4. Project management, institutional strengthening, Individual TZ-MNRT-17058-CS-INDV / IDA / Q9740 quality assurance and Post Consultant Open 30,000.00 28,331.15 Completed 2017-06-06 2017-06-06 2017-06-06 2016-10-20 2017-06-06 2016-12-05 2017-06-27 2016-12-15 2017-12-24 2018-01-31 Institutional assessment control, and monitoring and Selection evaluation TZ-MNRT-18592-CS-INDV / Consultancy Services for 4. Project management, reviewing the existing institutional strengthening, Individual documents and preparation of IDA / Q9740 quality assurance and Post Consultant Open 30,000.00 99,957.00 Signed 2017-06-20 2017-07-20 2017-06-20 2015-11-17 2017-06-20 2016-02-15 2017-07-11 2016-03-14 2018-01-07 Project Implementation control, and monitoring and Selection manual (PIM) for REGROW evaluation Project. 4. Project management, institutional strengthening, Individual TZ-MNRT-40659-CS-INDV / IDA / 61430 quality assurance and Post Consultant Open 80,000.00 0.00 Canceled 2018-01-28 2018-03-18 2018-04-08 2018-05-13 2018-11-09 Training need asesment control, and monitoring and Selection evaluation 4. Project management, institutional strengthening, Individual TZ-MNRT-40899-CS-INDV / IDA / 61430 quality assurance and Post Consultant Open 20,000.00 0.00 Canceled 2018-02-28 2018-04-18 2018-05-09 2018-06-13 2018-12-10 Development of web page control, and monitoring and Selection evaluation TZ-MNRT-57593-CS-INDV / Consultancy service for 4. Project management, preparation of communication institutional strengthening, Individual strategy for Resilient natural IDA / 61430 quality assurance and Post Consultant Open 50,000.00 0.00 Canceled 2018-04-23 2019-11-21 2018-06-11 2018-07-02 2018-08-06 2019-02-02 Resources management for control, and monitoring and Selection Tourism and Growth evaluation (REGROW) Project TZ-MNRT-57596-CS-INDV / Consultancy services for 4. Project management, establishment of baseline for institutional strengthening, Individual Under Monitoring and Evaluation for IDA / 61430 quality assurance and Post Consultant Open 90,000.00 0.00 2018-04-20 2020-02-04 2018-06-08 2021-04-14 2018-06-29 2018-08-03 2019-01-30 Implementation Resilient natural Resource control, and monitoring and Selection Management for Tourism and evaluation Growth (REGROW) Project 4. Project management, TZ-MNRT-57448-CS-INDV / institutional strengthening, Individual provision of Financial IDA / 61430 quality assurance and Prior Consultant Open 132,000.00 0.00 Canceled 2018-04-15 2018-05-13 2018-06-03 2018-06-24 2018-07-29 2019-01-25 Management support services control, and monitoring and Selection by June 2018 evaluation 4. Project management, TZ-MNRT-57449-CS-INDV / institutional strengthening, Individual Provision of procurement IDA / 61430 quality assurance and Prior Consultant Open 132,000.00 0.00 Canceled 2018-04-10 2018-05-13 2018-05-29 2018-06-19 2018-07-24 2019-01-20 support services by June 2018 control, and monitoring and Selection evaluation TZ-MNRT-65394-CS-INDV / 4. Project management, Consultancy Services for institutional strengthening, Individual provision of Environmental IDA / 61430 quality assurance and Post Consultant Open 90,000.00 0.00 Canceled 2018-06-07 2018-06-07 2018-07-26 2018-08-16 2018-09-20 2019-03-19 and Social Safeguards control, and monitoring and Selection Management and supervision. evaluation TZ-MNRT-187352-CS-INDV / Facilitate the establishment 1. Strengthen management Individual of an e- learning training Under IDA / 61430 and improve infrastructure in Post Consultant Open 15,000.00 0.00 2020-09-01 2021-03-10 2020-10-20 2020-11-10 2020-12-15 2021-06-13 platform on southern tourism Implementation priority Protected Areas Selection circuit for international travel agents for TTB TZ-MNRT-196123-CS-INDV / Consultancy services for 1. Strengthen management Individual Under preparation of design and IDA / 61430 and improve infrastructure in Post Consultant Limited 10,200.00 0.00 2020-10-01 2021-03-10 2020-10-06 2020-10-27 2020-12-01 2021-05-30 Implementation printing Southern Circuit priority Protected Areas Selection Tourism Map for TTB Page 3 Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412) I. General 1. Bank’s approval Date of the procurement Plan Original: June 2,2016: Revision 3 of Updated Procurement Plan, February 5,2017 2. Date of General Procurement Notice: June 2016 3. Period covered by this procurement plan: The procurement period of project covered, 24 months II. Goods and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Expenditure Contract Value Procurement Contracts Subject to Category (Threshold) Method Prior Review US $ US$ thousand 1.Civil Works Not applicable 2. Goods >600,000 ICB First contract by all entities <600,000 NCB First contract by all entities <100,000 Shopping First contract by all entities Regardless of value Direct Contracting All 2. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 3. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) July 9, 2010 [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 0.2 2 No Post 1st of the NCB contrac (Goods) t for Prior Review III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: 3. Consulting All ToRs and training Services programs to be reviewed by the World Bank’s task team leader (A) Firms >500,000 QCBS, QBS,FBS,LCS, First contract by any process <500,000 CQS, First CQS contract Regardless of value SSS All (B) Individual Up to 200,000 Under Section V (i) First contract Consultants and; (ii) Procurement Specialist regardless of value >200,000 Under Section V All Regardless of value SSS First > 15,000 SSS All July 9, 2010 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 8.5 5 1 Prior/ of number 4 Post of contracts that will be let under QCBS Summary 0.5 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Pakistan : Governance and Policy Project for Balochistan PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2017-08-04 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156411 GPN Date: Project Name: Governance and Policy Project for Balochistan Loan / Credit No: TF / A3352 FD Governance and Policy Project Balochistan Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-FD GPP-23286-GO-RFQ / Purchase of IT equipment i.e. Increasing effectiveness of Request for Single Stage - One TF / A3352 Prior Limited 50,437.00 18,086.15 Signed 2017-09-10 2017-11-05 2018-05-03 2018-05-04 laptops, desktops, printers, sales tax collection Quotations Envelope photocopiers, etc. PK-FD GPP-23288-GO-RFQ / Increasing effectiveness of Request for Single Stage - One TF / A3352 Post Limited 43,903.00 4,156.59 Signed 2017-08-08 2017-12-15 2017-10-03 2018-01-08 2018-04-01 Purchase of furniture. sales tax collection Quotations Envelope PK-FD GPP-23291-GO-RFQ / Purchase of office equipment Increasing effectiveness of Request for Single Stage - One i.e. air conditioner, TF / A3352 Post Limited 9,757.00 0.00 Canceled 2017-09-08 2017-11-03 2018-05-02 sales tax collection Quotations Envelope refrigerator, microwave oven, etc.) PK-FD GPP-24550-GO-RFQ / Development of database and Increasing effectiveness of Request for Single Stage - One TF / A3352 Post Limited 9,709.00 0.00 Canceled 2017-09-25 2017-11-20 2018-05-19 website for Balochistan's sales tax collection Quotations Envelope Public Accounts Committee. PK-FD GPP-107321-GO-RFQ Increasing effectiveness of Request for Single Stage - One / Purchase of furniture for TF / A3352 Post Limited 2,885.00 0.00 Canceled 2019-04-20 2019-06-15 2019-12-12 sales tax collection Quotations Envelope NFC strengthening. PK-FD GPP-107325-GO-RFQ Increasing effectiveness of Request for Single Stage - One / Purchase of furniture for TF / A3352 Post Limited 38,029.00 27,690.43 Signed 2019-04-27 2020-08-23 2019-06-22 2019-11-08 2019-12-19 sales tax collection Quotations Envelope BRA regional offices. PK-FD GPP-110297-GO-RFQ Increasing effectiveness of Request for Single Stage - One / Purchase of IT equipment TF / A3352 Post Limited 84,692.00 58,645.06 Signed 2019-05-04 2020-08-23 2019-06-29 2019-11-08 2019-12-26 sales tax collection Quotations Envelope for BRA regional offices. PK-FD GPP-144473-GO-RFQ Strengthening accountability / Purchase of Air Conditioners Request for Single Stage - One TF / A3352 in public financial Post Limited 2,800.00 3,967.81 Signed 2019-12-22 2020-09-12 2020-02-16 2020-09-30 2020-08-14 for various CN's under Finance Quotations Envelope management Department. PK-FD GPP-144447-GO-RFQ Strengthening accountability / Purchase of IT equipment Request for Single Stage - One TF / A3352 in public financial Post Limited 54,700.00 103,031.97 Signed 2019-12-22 2020-09-12 2020-02-16 2020-09-30 2020-08-14 for various CN's under Finance Quotations Envelope management Department. PK-FD GPP-144459-GO-RFQ Strengthening accountability Pending / Purchase of furniture for Request for Single Stage - One TF / A3352 in public financial Post Limited 12,440.00 0.00 Implementati 2021-04-20 2021-06-15 2021-12-12 various CN's under Finance Quotations Envelope management on Department. PK-FD GPP-107320-GO-RFQ Increasing effectiveness of Request for Single Stage - One / Purchase of IT equipment TF / A3352 Prior Limited 5,529.00 0.00 Canceled 2019-04-20 2019-06-15 2019-12-12 sales tax collection Quotations Envelope for NFC strengthening. PK-FD GPP-220587-GO-RFQ Strengthening accountability Under / Purchase of Electrical items Request for Single Stage - One TF / A3352 in public financial Post Limited 92,000.00 0.00 Implementati 2021-03-08 2021-03-11 2021-05-03 2021-10-30 for Balochistan Public Service Quotations Envelope management on Commission. PK-FD GPP-220591-GO-RFQ Strengthening accountability Under / Purchase of Furniture for Request for Single Stage - One TF / A3352 in public financial Post Limited 45,000.00 0.00 Implementati 2021-03-15 2021-03-11 2021-05-10 2021-11-06 Balochistan Public Service Quotations Envelope management on Commission. PK-FD GPP-220584-GO-RFB Strengthening accountability Under / Purchase of IT Equipment Single Stage - One TF / A3352 in public financial Post Request for Bids Open - National 455,000.00 0.00 Implementati 2021-02-25 2021-04-28 2021-03-02 2021-05-31 2021-04-13 2021-04-27 2021-06-01 2021-11-28 for Balochistan Public Service Envelope management on Commission. PK-FD GPP-220593-GO-RFQ Strengthening accountability Under / Renovation of computer labs Request for Single Stage - One TF / A3352 in public financial Post Limited 75,000.00 0.00 Implementati 2021-03-22 2021-03-11 2021-05-17 2021-11-13 of Balochistan Public Service Quotations Envelope management on Commission. PK-FD GPP-144469-GO-RFQ Strengthening accountability Request for Single Stage - One / Purchase of AC for Debt TF / A3352 in public financial Post Limited 667.00 0.00 Canceled 2021-04-20 2021-06-15 2021-12-12 Quotations Envelope Management Unit. management PK-FD GPP-230244-GO-RFQ Strengthening accountability Pending Request for Single Stage - One / Purchase of furniture for TF / A3352 in public financial Post Limited 3,500.00 0.00 Implementati 2021-06-05 2021-07-20 2021-08-19 Quotations Envelope BPPRA management on PK-FD GPP-230240-GO-RFB Strengthening accountability Under Single Stage - One / Purchase of Office TF / A3352 in public financial Post Request for Bids Open - National 135,000.00 0.00 Implementati 2021-05-31 2021-05-28 2021-06-05 2021-05-31 2021-07-17 2021-07-18 2021-08-22 2021-11-20 Envelope Equipment for BPPRA management on Page 1 PK-FD GPP-230246-GO-RFQ Strengthening accountability Pending Request for Single Stage - One / Sound proofing and lighting TF / A3352 in public financial Post Limited 17,000.00 0.00 Implementati 2021-07-04 2021-08-18 2021-09-17 Quotations Envelope of conference hall for BPPRA management on PK-FD GPP-230237-GO-RFB Strengthening accountability Under Single Stage - One / Procurement of IT goods for TF / A3352 in public financial Post Request for Bids Open - National 130,000.00 0.00 Implementati 2021-05-31 2021-04-28 2021-06-05 2021-05-31 2021-07-17 2021-07-27 2021-08-31 2021-11-29 Envelope BPPRA and BRA. management on PK-FD GPP-230242-GO-RFQ Strengthening accountability Pending / Purchase of electrical items Request for Single Stage - One TF / A3352 in public financial Post Open - National 30,000.00 0.00 Implementati 2021-06-05 2021-08-03 2021-08-24 (UPS, Generator, AC, Mosquito Quotations Envelope management on Repellent.) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-FD GPP-23299-CS-CQS / Consultant Hiring of institutional support Increasing effectiveness of TF / A3352 Prior Qualification Open - National 310,680.00 0.00 Canceled 2017-09-14 2017-10-05 2017-11-18 2017-12-18 2018-01-22 2018-07-21 for Balochistan Revenue sales tax collection Selection Authority. PK-FD GPP-23294-CS-CQS / Hiring of firm for providing Consultant strategic support in the areas Increasing effectiveness of TF / A3352 Post Qualification Open - National 78,641.00 0.00 Canceled 2017-10-18 2017-11-08 2017-12-22 2018-01-21 2018-02-25 2018-08-24 of communication and sales tax collection Selection reporting and other related services. PK-FD GPP-23296-CS-CQS / Consultant Increasing effectiveness of Hiring of firm for assessing TF / A3352 Post Qualification Open - National 87,739.00 228,530.80 Signed 2017-09-13 2017-03-15 2017-10-04 2017-11-17 2019-02-25 2017-12-17 2019-04-22 2018-01-21 2019-04-22 2018-07-20 sales tax collection Balochistan's tax revenue. Selection PK-FD GPP-23323-CS-QCBS / Hiring of firm/(s) for Increasing effectiveness of Quality And Cost- TF / A3352 Prior Open - International 692,718.00 0.00 Canceled 2017-08-31 2017-09-21 2017-11-04 2017-12-04 2018-01-03 2018-02-07 2018-03-14 2019-03-14 providing strategic support in sales tax collection Based Selection the areas of PFM. PK-FD GPP-66584-CS-CQS / Strengthening accountability Consultant Hiring of actuarial firm for TF / A3352 in public financial Post Qualification Open - National 38,835.00 28,596.96 Signed 2018-06-21 2018-06-20 2018-07-12 2018-08-25 2018-07-19 2018-09-24 2018-11-06 2018-10-29 2018-11-28 2019-04-27 assessment of Balochistan's management Selection end of service liabilities. PK-FD GPP-25473-CS-LCS / Hiring of firm/(s) for Increasing effectiveness of Least Cost TF / A3352 Prior Open - National 692,718.00 0.00 Canceled 2017-08-31 2017-09-12 2017-09-21 2017-11-04 2017-12-02 2018-01-01 2018-02-05 2018-03-12 2018-09-08 providing strategic support in sales tax collection Selection the areas of PFM. PK-FD GPP-110768-CS-CQS Consultant Increasing effectiveness of / Development of BRA's IT TF / A3352 Post Qualification Open - National 38,462.00 0.00 Canceled 2019-08-22 2019-09-12 2019-10-26 2019-11-25 2019-12-30 2020-06-27 sales tax collection solution. Selection PK-FD GPP-178171-CS-CQS Strengthening accountability Consultant Under / Hiring of firm for TF / A3352 in public financial Post Qualification Open - National 18,750.00 0.00 2020-06-16 2021-03-19 2020-07-07 2021-03-26 2020-08-20 2021-04-28 2020-09-19 2020-10-24 2021-04-22 Implementation Balochistan's sector scanning management Selection PK-FD GPP-144499-CS-CQS Strengthening accountability Consultant / Drafting Rules for Provincial TF / A3352 in public financial Post Qualification Open - National 80,000.00 0.00 Canceled 2019-12-31 2020-01-21 2020-03-05 2020-04-04 2020-05-09 2020-11-05 Revenue Management Unit. management Selection PK-FD GPP-218991-CS-CQS Consultant / Hiring of firm for Increasing effectiveness of Under TF / A3352 Post Qualification 100,000.00 0.00 2021-02-18 2021-02-19 2021-03-11 2021-02-24 2021-04-24 2021-05-24 2021-06-28 2021-12-25 Balochistan's Non-Tax sales tax collection Implementation Selection Revenue Mobilization. PK-FD GPP-220595-CS-CQS / Development of SRS and Strengthening accountability Consultant Under Online Testing System ERP TF / A3352 in public financial Post Qualification Open - National 124,000.00 0.00 2021-03-24 2021-04-16 2021-04-14 2021-06-03 2021-04-24 2021-05-01 2021-06-05 2021-12-02 Implementation Software for Balochistan management Selection Public Service Commission. PK-FD GPP-226833-CS-CQS / Hiring of firm for conducting Strengthening accountability Consultant Under feasibility study on TF / A3352 in public financial Post Qualification Open - National 31,250.00 0.00 2021-04-08 2021-04-02 2021-04-29 2021-04-05 2021-05-23 2021-07-02 2021-08-06 2022-02-02 Implementation establishing a bank for management Selection government of Balochistan. Strengthening accountability Consultant PK-FD GPP-144496-CS-CQS TF / A3352 in public financial Post Qualification Open - National 33,333.00 0.00 Canceled 2019-12-31 2020-01-21 2020-03-05 2020-04-04 2020-05-09 2020-11-05 / Drafting of Act for PFM Unit. management Selection PK-FD GPP-144493-CS-CQS Strengthening accountability Consultant / Drafting of Regulatory TF / A3352 in public financial Post Qualification Open - National 13,333.00 0.00 Canceled 2019-12-31 2020-01-21 2020-03-05 2020-04-04 2020-05-09 2020-11-05 Framework for Debt management Selection Management Unit. PK-FD GPP-144492-CS-CQS Strengthening accountability Consultant / Development of database TF / A3352 in public financial Post Qualification Open - National 66,667.00 0.00 Canceled 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2022-02-04 for Debt Management Unit. management Selection PK-FD GPP-144497-CS-CQS Consultant Increasing effectiveness of / Website development for TF / A3352 Post Qualification Open - National 20,000.00 0.00 Canceled 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2022-02-04 sales tax collection Public Accounts Committee. Selection INDIVIDUAL CONSULTANTS Page 2 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-FD GPP-34506-CS-INDV / Hiring of Engineer for strengthening of Public Strengthening accountability Individual Accounts Committee for TF / A3352 in public financial Post Consultant Open 11,462.00 0.00 Canceled 2017-10-31 2017-11-02 2017-12-19 2018-01-09 2018-02-13 2018-08-12 scrutiny of audit reports in management Selection Balochistan under component 2 of GPP Balochistan. PK-FD GPP-34507-CS-INDV / Hiring of Communication, Media and Research Specialist Strengthening accountability Individual for strengthening of Public TF / A3352 in public financial Post Consultant Open 11,462.00 5,185.82 Signed 2017-10-31 2017-11-02 2017-12-19 2018-02-05 2018-01-09 2018-02-07 2018-02-13 2018-02-07 2018-08-12 Accounts Committee under management Selection component 2 of GPP Balochistan. PK-FD GPP-34502-CS-INDV / Hiring of Auditor for Public Strengthening accountability Individual Accounts Committee's TF / A3352 in public financial Post Consultant Open 19,103.00 7,562.66 Signed 2017-11-29 2017-11-02 2018-01-17 2017-12-26 2018-02-07 2018-01-08 2018-03-14 2018-01-08 2018-09-10 strengthening towards management Selection legislative scrutiny of audit reports in Balochistan. Strengthening accountability Individual PK-FD GPP-38241-CS-INDV TF / A3352 in public financial Post Consultant Open 19,103.00 7,562.66 Signed 2017-11-29 2017-11-01 2018-01-17 2018-01-17 2018-02-07 2018-01-19 2018-03-14 2018-01-19 2018-09-10 / Hiring of auditor for PAC. management Selection PK-FD GPP-23309-CS-CDS / Analysis, Design and Development of Public Increasing effectiveness of TF / A3352 Prior Direct Selection Direct 281,553.00 759,014.13 Signed 2017-12-04 2017-12-20 2017-12-14 2018-04-11 2018-02-17 2018-06-28 2018-08-16 Financial Management's sales tax collection Professional Accreditation Program. PK-FD GPP-23308-CS-CDS / Increasing effectiveness of Designing of Professional TF / A3352 Post Direct Selection Direct 14,563.00 0.00 Canceled 2017-09-21 2017-10-01 2017-12-05 2018-06-03 sales tax collection Accreditation Program. PK-FD GPP-79488-CS-INDV Strengthening accountability Individual / Hiring of Chief Internal TF / A3352 in public financial Post Consultant Open 43,689.00 27,866.46 Signed 2018-10-03 2018-11-21 2018-11-21 2019-02-04 2018-12-12 2019-03-11 2019-01-16 2019-03-11 2020-07-09 Auditor for Internal Audit management Selection Unit. PK-FD GPP-79496-CS-INDV Strengthening accountability Individual / Hiring of Internal Audit TF / A3352 in public financial Post Consultant Open 34,951.00 22,030.01 Signed 2018-10-03 2018-11-21 2018-11-21 2019-02-14 2018-12-12 2019-03-18 2019-01-16 2019-03-18 2020-07-09 Manager for Internal Audit management Selection Unit. PK-FD GPP-79498-CS-INDV Strengthening accountability Individual / Hiring of Debt Management TF / A3352 in public financial Post Consultant Open 52,427.00 46,966.75 Signed 2018-10-03 2018-11-28 2018-11-21 2019-02-04 2018-12-12 2019-06-24 2019-01-16 2019-06-24 2020-07-09 Specialist for Debt management Selection Management Unit. PK-FD GPP-79504-CS-INDV Strengthening accountability Individual / Hiring of Financial Analyst TF / A3352 in public financial Post Consultant Open 34,951.00 23,222.05 Signed 2018-10-03 2018-11-21 2018-11-21 2019-01-08 2018-12-12 2019-02-15 2019-01-16 2019-02-15 2020-07-09 for Debt Management Unit. management Selection PK-FD GPP-107322-CS-INDV Strengthening accountability Individual / Hiring of Technical Research TF / A3352 in public financial Post Consultant Open 23,077.00 15,481.37 Signed 2019-04-15 2019-04-16 2019-06-03 2019-05-20 2019-06-24 2019-05-20 2019-07-29 2019-05-20 2021-01-19 Expert for NFC. management Selection PK-FD GPP-125866-CS-INDV Strengthening accountability Individual / Hiring of Internal Audit Under TF / A3352 in public financial Post Consultant Open 34,951.00 0.00 2019-08-08 2019-09-03 2019-10-10 2019-10-31 2019-12-05 2021-05-28 Manager for Internal Audit Implementation management Selection Unit. PK-FD GPP-144479-CS-INDV Strengthening accountability Individual / Hiring of Legal Expert for TF / A3352 in public financial Post Consultant Open 10,000.00 0.00 Canceled 2019-12-24 2020-02-11 2020-03-03 2020-04-07 2020-10-04 Public Accounts Committee. management Selection PK-FD GPP-144474-CS-INDV Individual Increasing effectiveness of / Hiring of Senior Revenue TF / A3352 Post Consultant Open 32,000.00 14,928.52 Signed 2019-12-24 2020-01-07 2020-02-11 2020-01-29 2020-03-03 2020-02-06 2020-04-07 2020-02-06 2021-04-02 sales tax collection Consultant for 12 months. Selection PK-FD GPP-193573-CS-INDV / Hiring of PFM Expert to Strengthening accountability Individual review the contents of ACCA's TF / A3352 in public financial Post Consultant Open 37,500.00 25,318.84 Signed 2020-09-11 2020-09-16 2020-10-30 2021-02-04 2020-11-20 2021-02-04 2020-12-25 2021-02-04 2021-03-31 deliverables against PFM-PAP management Selection Contract with an estimated amount of PKR 6 M. PK-FD GPP-144478-CS-INDV Strengthening accountability Individual / Hiring of Audit and Financial TF / A3352 in public financial Post Consultant Open 14,000.00 0.00 Canceled 2019-12-24 2020-02-11 2020-03-03 2020-04-07 2020-10-04 Analyst for Public Accounts management Selection Committee for 6 months. PK-FD GPP-144479-CS-INDV- Strengthening accountability Individual 2 / Hiring of Legal Expert for TF / A3352 in public financial Post Consultant Open 10,000.00 0.00 Canceled 2020-08-19 2020-11-07 2020-10-07 2020-10-28 2020-12-02 2021-05-31 Public Accounts Committee. management Selection PK-FD GPP-144485-CS-INDV Strengthening accountability Individual / Hiring of Internal Audit TF / A3352 in public financial Post Consultant Open 32,000.00 0.00 Canceled 2019-12-24 2020-02-11 2020-03-03 2020-04-07 2021-04-02 Manager for Internal Audit management Selection Unit for 12 months. PK-FD GPP-144490-CS-INDV Strengthening accountability Individual / Hiring of Financial Analyst TF / A3352 in public financial Post Consultant Open 24,000.00 0.00 Canceled 2019-12-31 2020-02-18 2020-03-10 2020-04-14 2021-04-09 for Debt Management Unit for management Selection 12 months. PK-FD GPP-144491-CS-INDV Strengthening accountability Individual / Hiring of Financial Analyst TF / A3352 in public financial Post Consultant Open 24,000.00 0.00 Canceled 2019-12-31 2020-02-18 2020-03-10 2020-04-14 2021-04-09 for Debt Management Unit for management Selection 12 months. Page 3 PK-FD GPP-144489-CS-INDV / Hiring of Debt Management Strengthening accountability Individual Specialist for Debt TF / A3352 in public financial Post Consultant Open 52,000.00 0.00 Canceled 2019-12-31 2020-02-18 2020-03-10 2020-04-14 2021-04-09 Management Unit for 12 management Selection months. Strengthening accountability Individual PK-FD GPP-38242-CS-INDV TF / A3352 in public financial Post Consultant Open 19,103.00 0.00 Canceled 2017-11-29 2017-11-02 2018-01-17 2017-12-22 2018-02-07 2018-03-14 2018-09-10 / Hiring of auditor for PAC. management Selection PK-FD GPP-144480-CS-INDV / Hiring of Communication Strengthening accountability Individual and Reporting Expert for TF / A3352 in public financial Post Consultant Open 8,000.00 0.00 Canceled 2019-12-24 2020-02-11 2020-03-03 2020-04-07 2020-10-04 Public Accounts Committee management Selection for 6 months. PK-FD GPP-219833-CS-INDV Strengthening accountability Individual Under / Hiring of Senior PFM TF / A3352 in public financial Post Consultant Open 52,000.00 0.00 2021-02-23 2021-02-17 2021-04-13 2021-05-04 2021-06-08 2022-06-08 Implementation Specialist for PFM Unit. management Selection PK-FD GPP-226834-CS-INDV Strengthening accountability Individual / Hiring of Banking Advisor TF / A3352 in public financial Post Consultant Open 37,500.00 50,830.88 Signed 2021-04-08 2021-04-02 2021-05-11 2021-05-05 2021-06-01 2021-05-20 2021-07-06 2021-05-20 2022-05-31 for establishing Balochistan management Selection bank. PK-FD GPP-79508-CS-INDV / Hiring of Public Investment Strengthening accountability Individual Management Specialist for TF / A3352 in public financial Post Consultant Open 34,951.00 0.00 Canceled 2021-02-11 2021-04-01 2021-04-22 2021-05-27 2022-11-18 Balochistan Board of management Selection Investment. PK-FD GPP-79506-CS-INDV Strengthening accountability Individual / Hiring of Legal Framework TF / A3352 in public financial Post Consultant Open 34,951.00 0.00 Canceled 2021-02-11 2021-04-01 2021-04-22 2021-05-27 2022-11-18 Specialist for Balochistan management Selection Board of Investment. PK-FD GPP-144475-CS-INDV / Hiring of Financial Strengthening accountability Individual Management Specialist for TF / A3352 in public financial Post Consultant Open 28,000.00 0.00 Canceled 2021-03-31 2021-05-19 2021-06-09 2021-07-14 2022-07-09 Corporate Governance Unit for management Selection 12 months. PK-FD GPP-233990-CS-INDV Individual / Hiring of Legal Consultant Increasing effectiveness of Under TF / A3352 Post Consultant Open 14,000.00 0.00 2021-05-26 2021-06-07 2021-06-30 2021-07-05 2021-08-09 2022-02-05 for Balochistan Revenue sales tax collection Implementation Selection Authority PK-FD GPP-233995-CS-INDV Individual Increasing effectiveness of Under / Hiring of Sales Tax TF / A3352 Post Consultant Open 14,000.00 0.00 2021-05-25 2021-05-19 2021-06-29 2021-07-06 2021-07-27 2022-01-23 sales tax collection Implementation Consultant Selection PK-FD GPP-233999-CS-INDV Individual Increasing effectiveness of Under / Hiring of Capacity Building & TF / A3352 Post Consultant Open 14,000.00 0.00 2021-05-26 2021-05-19 2021-06-30 2021-07-07 2021-07-28 2022-01-24 sales tax collection Implementation Financial Expert Selection PK-FD GPP-234000-CS-INDV Individual Increasing effectiveness of Under / Hiring of Auditor for TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-26 2021-05-19 2021-06-30 2021-07-07 2021-07-28 2022-01-24 sales tax collection Implementation Balochistan Revenue Authority Selection PK-FD GPP-234001-CS-INDV Individual Increasing effectiveness of Under / Hiring of Auditor for TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-26 2021-05-19 2021-06-30 2021-07-07 2021-07-28 2022-01-24 sales tax collection Implementation Balochistan Revenue Authority Selection PK-FD GPP-234002-CS-INDV Individual Increasing effectiveness of Under / Hiring of Auditor for TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-26 2021-05-19 2021-06-30 2021-07-07 2021-07-28 2022-01-24 sales tax collection Implementation Balochistan Revenue Aurhority Selection PK-FD GPP-234004-CS-INDV Individual Increasing effectiveness of Under / Hiring of Auditor for TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-26 2021-05-19 2021-06-30 2021-07-07 2021-07-28 2022-01-24 sales tax collection Implementation Balochistan Revenue Authority Selection PK-FD GPP-234006-CS-INDV Individual Increasing effectiveness of Under / Hiring of Auditor for TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-26 2021-05-19 2021-06-30 2021-07-07 2021-07-28 2022-01-24 sales tax collection Implementation Balochistan Revenue Authority Selection PK-FD GPP-234007-CS-INDV Individual / Hiring of Tax Enforcement Increasing effectiveness of Under TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-28 2021-05-19 2021-07-02 2021-07-09 2021-07-30 2022-01-26 Inspector for Balochistan sales tax collection Implementation Selection Revenue Authority PK-FD GPP-234008-CS-INDV Individual / Hiring of Tax Enforcement Increasing effectiveness of Under TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-28 2021-06-04 2021-07-02 2021-07-09 2021-07-30 2022-01-26 Inspector for Balochistan sales tax collection Implementation Selection Revenue Authority PK-FD GPP-234009-CS-INDV Individual / Hiring of Tax Enforcement Increasing effectiveness of Under TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-28 2021-06-04 2021-07-02 2021-07-09 2021-07-30 2022-01-26 Inspector for Balochistan sales tax collection Implementation Selection Revenue Authority PK-FD GPP-234010-CS-INDV Individual / Hiring of Tax Enforcement Increasing effectiveness of Under TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-28 2021-06-04 2021-07-02 2021-07-09 2021-07-30 2022-01-26 Inspector for Balochistan sales tax collection Implementation Selection Revenue Authority PK-FD GPP-234011-CS-INDV Individual / Hiring of Tax Enforcement Increasing effectiveness of Under TF / A3352 Post Consultant Open 5,833.00 0.00 2021-05-28 2021-06-04 2021-07-02 2021-07-09 2021-07-30 2022-01-26 Inspector for Balochistan sales tax collection Implementation Selection Revenue Authority PK-FD GPP-235142-CS-INDV Strengthening accountability Individual / Hiring of Communication/ Under TF / A3352 in public financial Post Consultant Open 14,000.00 0.00 2021-05-26 2021-05-19 2021-06-25 2021-07-02 2021-07-23 2022-01-19 Media Expert for Balochistan Implementation management Selection Revenue Authority PK-FD GPP-237830-CS-CDS Strengthening accountability / Hiring of Accountability Lab Under TF / A3352 in public financial Post Direct Selection Direct 350,000.00 0.00 2021-06-08 2021-06-03 2021-06-18 2021-07-28 2022-01-24 for strengthening of Public Implementation management Accounts Committee. Page 4 PROCUREMENT PLAN (Textual Part) Project information: Mongolia Export Development Project (P147438) Project Implementation agency: Agricultural Reinsurance Joint Stock Company (AgRe) Date of the Procurement Plan: March 07, 2017 Period covered by this Procurement Plan: March 01, 2017 - March 01, 2018 1.Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. 2. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. 3. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 3.1 National Open Competitive Procurement When the Borrower uses its own national open competitive procurement arrangements as set forth in Chapter Two of the Public Procurement Law of Mongolia enacted on December 1, 2005, as amended several times with the latest amendment on February 9, 2017, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Participation in Bidding and Preferences (i) Government-owned enterprises in Mongolia shall be eligible to participate in bidding only if they can establish that they are legally and financially autonomous, operate under commercial law, and are not a dependent of the agency contracting them. (ii) A bidder declared ineligible by the World Bank, based on a determination by the World Bank that the bidder has engaged in corrupt, fraudulent, collusive, coercive or obstructive practices in competing for or in executing a World Bank-financed contract, shall be ineligible to participate and be awarded a World Bank- financed contract during the period determined by the World Bank. (iii) A firm which has been engaged by the Borrower to provide consulting services for the preparation or implementation of a project, and any of its affiliates, shall be disqualified from subsequently providing goods or works resulting from or directly related to the firm’s consulting services for such preparation or implementation. This provision does not apply to the various firms which together are performing the contractor’s obligations under a turnkey or design and build contract. (iv) Interested foreign bidders from eligible countries shall be allowed to participate without being required to associate or form joint ventures with local bidders. Foreign bidders shall be eligible to participate in bidding under the same conditions as local bidders. Mongolian bidders and goods of Mongolian origin shall be given no preference over foreign bidders, either in the bidding process or in the evaluation of bids. (v) Prior registration shall not be a requirement for any bidder to participate in bidding. (b) Request for Bids / Request for Proposals Documents (i) The request for bids/request for proposals documents shall be acceptable to the World Bank (ii) The request for bids / request for proposals documents and the signed contract shall include the clauses related to World Bank’s Policy in regard to corrupt and fraudulent practices. (iii) In the case of contracts of more than eighteen (18) months’ duration, the bidding documents and the resultant contract shall provide for price adjustment, based on a formula acceptable to the World Bank, which shall be disclosed to the bidders in the bidding documents. (v) There shall be no post-bidding negotiations with the lowest evaluated bidder or any other bidder. No bidder shall be required, as a condition for the award of contract, to change his bid price or otherwise materially alter his bid after it has been submitted. (c) Assessment of Bidder’s Qualification Qualification criteria shall be clearly specified in the bidding documents, and only criteria so specified, shall be used to determine whether a bidder is qualified. The evaluation of the bidder’s qualifications shall be conducted separately from the technical and commercial evaluation of the bid. When post qualification is applied, the assessment of bidder’s qualifications shall be carried out only after the preliminary and detailed evaluation of bids has been completed by the Recipient and, in doing so, the qualifications of the bidder who has submitted the lowest evaluated substantially responsive bid or most advantageous bid shall be assessed first. The evaluation of a bidder’s qualifications shall only take into account the bidder’s capacity and resources to perform the contract, specifically its experience and past performance on similar contracts, capabilities with respect to personnel, equipment and construction or manufacturing facilities and financial capacity. In carrying out the post-qualification assessment, the Recipient shall exercise reasonable judgment in requesting, in writing, from a bidder only missing factual or historical supporting information related to the bidder’s qualifications and shall provide a reasonable time period (that is, a minimum of seven days) to the bidder to provide his response. No bidders shall be disqualified on the ground that the bidder has tax debt. 3.2 Other National Procurement Arrangements When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. The request for bids / request for proposals / request for quotations documents should be acceptable to the Bank and jointly with the signed contract shall include the clauses related to World Bank’s Policy in regard to corrupt and fraudulent practices. The request for bids / request for proposals / request for quotations documents and the signed contract shall also include the clauses allowing the World Bank to inspect the site and/or all accounts and records relating to the performance of the contract and the submission of the bid or proposal, and to have such accounts and records audited. The standard text is attached hereafter. 4. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. 5. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable. 6. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations: Not applicable. 7. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not applicable. 8. Other Relevant Procurement Information: Not applicable. Fraud and The Bank requires compliance with the Bank’s Anti- Corruption Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the WBG’s Sanctions Framework, as set forth in Appendix to the GC. The Employer / Purchaser / Client requires the Contractor / Supplier / the Consultant to disclose any commissions or fees that may have been paid or are to be paid to agents or any other party with respect to the bidding /selection process or execution of the Contract. The information disclosed must include at least the name and address of the agent or other party, the amount and currency, and the purpose of the commission, gratuity or fee. Failure to disclose such commissions, gratuities or fees may result in termination of the Contract and/or sanctions by the Bank. Inspections The Contractor / Supplier / Consultant shall keep, and and Audit shall make all reasonable efforts to cause its by the Subcontractors and Sub-consultants to keep, accurate Bank and systematic accounts and records in respect of the Works / Goods / Services in such form and details as will clearly identify relevant time changes and costs. Pursuant to paragraph 2.2 e. of Appendix to the General Conditions the Contractor / Supplier / Consultant shall permit and shall cause its subcontractors and sub-consultants to permit, the Bank and/or persons appointed by the Bank to inspect the Site and/or the accounts and records relating to the performance of the Contract and the submission of the bid / proposal, and to have such accounts and records audited by auditors appointed by the Bank if requested by the Bank. The Contractor’s / Supplier’s / Consultant’s and its Subcontractors’ and sub- consultants’ acts intended to materially impede the exercise of the Bank’s inspection and audit rights constitute a prohibited practice subject to contract termination (as well as to a determination of ineligibility pursuant to the Bank’s prevailing sanctions procedures). APPENDIX TO GENERAL CONDITIONS Fraud and Corruption (Text in this Appendix shall not be modified) 1. Purpose 1.1 The Bank’s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations. 2. Requirements 2.1 The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders, consultants, contractors and suppliers; any sub- contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption. 2.2 To this end, the Bank: a. Defines, for the purposes of this provision, the terms set forth below as follows: i. “corrupt practice” is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party; ii. “fraudulent practice” is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation; iii. “collusive practice” is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party; iv. “coercive practice” is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party; v. “obstructive practice” is: (a) deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; or (b) acts intended to materially impede the exercise of the Bank’s inspection and audit rights provided for under paragraph 2.2 e. below. b. Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question; c. In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring miss-procurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question, without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time they knew of the practices; d. Pursuant to the Bank’s Anti- Corruption Guidelines and in accordance with the Bank’s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;1 (ii) to be a nominated2 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project; e. Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank loan, requiring (i) bidders, consultants, contractors, and suppliers, and their sub- contractors, sub-consultants, service providers, suppliers, agents 1 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 2 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. personnel, permit the Bank to inspect3 all accounts, records and other documents relating to the submission of bids and contract performance, and to have them audited by auditors appointed by the Bank. 3 Inspections in this context usually are investigative (i.e., forensic) in nature. They involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to: accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information. PROCUREMENT Mongolia : Mongolia Export Development Project PLAN General Information Country: Mongolia Bank’s Approval Date of the Original Procurement Plan: 2017-02-13 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147438 GPN Date: 2017-02-09 Project Name: Mongolia Export Development Project Loan / Credit No: IDA / 58790 E Executing Agency(ies): DP Project Implementation Unit WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EDP/3/GO/003 / Purchase of IT goods for MGF (PCs, UPS, Component 3: Project Request for Single Stage - One IDA / 58790 Post Open - National 13,500.00 11,504.70 Completed 2017-02-14 2017-02-24 2017-03-13 2017-03-10 2017-03-31 Copier machine, Printer and Implementation Support Quotations Envelope Scanner) EDP/3/GO/001 / Accounting Component 3: Project IDA / 58790 Prior Direct Selection Direct 3,150.00 3,107.97 Completed 2017-02-15 2017-03-02 2017-02-20 2017-02-24 2017-03-13 2021-06-23 2017-04-25 software for EDP Implementation Support EDP/1/GO/001 / Component 1: Development Underwriting and insurance IDA / 58790 of a new line of export Prior Direct Selection Direct 60,000.00 0.00 Canceled 2019-01-02 2019-01-07 2019-02-11 2021-02-10 policy management system finance products (MIS) EDP/3/GO/004 / Publications on printing MGF brochure and Component 3: Project Request for Single Stage - One IDA / 58790 Post Open - National 5,000.00 0.00 Canceled 2017-04-08 2017-06-03 2017-07-03 other required manuals Implementation Support Quotations Envelope (multiple contracts) EDP/3/GO/002 / Purchase of Component 3: Project Request for Single Stage - One IDA / 58790 Post Open - National 4,500.00 0.00 Canceled 2017-02-14 2017-02-24 2017-03-10 office furniture Implementation Support Quotations Envelope EDP/3/GO/0002 / Purchase Component 3: Project Request for Single Stage - One IDA / 58790 Post Open - National 4,950.00 4,336.59 Completed 2017-08-12 2017-10-07 2017-03-13 2018-04-05 2017-03-27 of office furniture Implementation Support Quotations Envelope EDP/3/GO/005 / Purchase of Component 3: Project Request for Single Stage - One IDA / 58790 Post Open - National 736.40 640.05 Completed 2017-12-11 2018-02-05 2017-11-28 2018-08-04 2017-12-12 Office Furniture Implementation Support Quotations Envelope EDP/3/GO/006 / Purchase of Component 3: Project Request for Single Stage - One IDA / 58790 Post Open - National 5,482.20 2,333.13 Completed 2017-12-11 2018-02-05 2017-11-21 2018-08-04 2017-12-05 IT Goods for Office Implementation Support Quotations Envelope EDP/21/GO/001 / Print-out Component 2: Export Request for Single Stage - One handbook "Guide to IDA / 58790 competitiveness Post Open - National 2,000.00 0.00 Canceled 2018-09-05 2018-10-31 2019-04-29 Quotations Envelope exporting" enhancement. EDP/21/GO/002 / Printing Component 2: Export out handbooks for Mongolian Request for Single Stage - One IDA / 58790 competitiveness Post Open - National 2,000.00 0.00 Canceled 2018-12-08 2019-02-02 2019-03-04 councils and diplomats in Quotations Envelope enhancement. abroad. G-3-1B/20 / PIU office Component 3: Project Request for Single Stage - One equipment (refrig., IDA / 58790 Post Limited 5,000.00 4,441.37 Signed 2020-03-30 2020-06-25 2020-05-25 2020-07-06 2020-06-08 Implementation Support Quotations Envelope microwave, water dispenser, and etc) G-3-1A/20 / PIU office Component 3: Project Request for Single Stage - One equipment (pcs, desktops, IDA / 58790 Post Limited 10,000.00 10,165.03 Completed 2020-03-30 2020-06-18 2020-05-25 2020-07-06 2020-06-08 2020-07-25 Implementation Support Quotations Envelope laptop, ups and etc.) G-3-2A/20 / PIU office Component 3: Project Request for Single Stage - One furniture (desks, chairs, filing IDA / 58790 Post Limited 10,000.00 8,513.09 Completed 2020-03-30 2020-06-18 2020-05-25 2020-07-06 2020-05-28 2020-08-07 Implementation Support Quotations Envelope cabinets, and etc) G-3-2B/20 / PIU office furniture (training room tables Component 3: Project Request for Single Stage - One IDA / 58790 Post Limited 5,000.00 3,585.39 Completed 2020-03-30 2020-06-18 2020-06-03 2020-07-06 2020-06-06 2020-07-10 chairs, boards, credenzas, Implementation Support Quotations Envelope small items and etc) G-3-3/20 / Printing of the Component 2: Export Pending Request for Single Stage - One project introduction and IDA / 58790 competitiveness Post Limited 10,000.00 0.00 Implementati 2020-10-20 2020-12-15 2021-01-14 Quotations Envelope brochures enhancement. on NCS-3-1/20 / Service to Under Component 3: Project Request for Single Stage - One develop and maximize public IDA / 58790 Post Open - National 20,000.00 0.00 Implementati 2020-10-20 2020-12-15 2021-06-13 Implementation Support Quotations Envelope awareness of the project on G-2-33/21 / Procurement of Component 2: Export Under research and studies from IDA / 58790 competitiveness Post Direct Selection Direct 25,000.00 0.00 Implementati 2021-03-26 2021-04-09 2021-03-31 2021-05-05 2021-11-01 International Research enhancement. on Institutes Pending G-4-38/21 / Equipment for Component 3: Project Request for Single Stage - One IDA / 58790 Post Open - National 15,000.00 0.00 Implementati 2021-04-29 2021-07-09 2021-08-08 Project Implementation Unit Implementation Support Quotations Envelope on Page 1 G-3-1/21 / Provide necessary laboratory equipment for Central Leather Laboratory of Food, Agriculture, Light Industry Component 3: Strengthening Pending Single Stage - One Research and Development IDA / 58790 Certification Services and Post Request for Bids Open - International 1,000,000.00 0.00 Implementati 2021-08-01 2021-08-16 2021-09-27 2021-10-27 2021-12-01 2022-05-30 Envelope Center and Central Laboratory Quality Management on for Wool and Cashmere Testing of Light industry Research and Development Institute NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NCS-2-34/21 / Translation Component 2: Export Under Request for Single Stage - One service for International IDA / 58790 competitiveness Post Limited 15,000.00 0.00 Implementati 2021-04-19 2021-05-29 2021-12-31 Quotations Envelope studies and research papers enhancement. on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EDP/3/CS/004 / Auditng of Consultant Component 3: Project PMU accounts (National IDA / 58790 Post Qualification Open - National 7,500.00 0.00 Canceled 2018-03-01 2018-03-22 2018-05-05 2018-06-04 2018-07-09 2018-10-07 Implementation Support consulting firms) Selection EDP/3/CS/0003 / National IT consulting firm for development of Project Consultant Implementation Monitoring Component 3: Project IDA / 58790 Prior Qualification Open - National 20,000.00 19,950.00 Completed 2017-07-01 2017-06-22 2017-07-22 2017-09-04 2017-10-16 2017-10-04 2020-03-25 2017-11-08 2017-10-20 2018-05-07 2018-02-27 Information System (PIMIS) to Implementation Support Selection register, track, monitor and report the project implementation EDP/1/CS/002 / Consultant or consultancy firm to conduct comprehensive Component 1: Development Consultant research along with client IDA / 58790 of a new line of export Post Qualification Open - National 60,000.00 0.00 Canceled 2017-06-05 2017-06-26 2017-08-09 2017-09-08 2017-10-13 2018-04-11 survey focusing on SME's on finance products Selection the market demand in the areas of export insurance products EDP/21/CS/029 / National Component 2: Export Consultant consulting firm to conduct IDA / 58790 competitiveness Post Qualification Open - National 36,800.00 0.00 Canceled 2018-07-31 2018-08-21 2018-10-04 2018-11-03 2018-12-08 2019-06-06 research and develop road- enhancement. Selection mapping of IT export services. EDP/21/CS/030 / National Component 2: Export Consultant consulting firm to conduct IDA / 58790 competitiveness Post Qualification Open - National 10,000.00 0.00 Canceled 2018-09-24 2018-10-15 2018-11-28 2018-12-28 2019-02-01 2019-07-31 needs assessment of the enhancement. Selection Foreign Academy of MNCCI EDP/1/CS/008 / Master service agreement with an international partner who will Component 1: Development Quality And Cost- provide technical assistance IDA / 58790 of a new line of export Prior Open - International 500,000.00 0.00 Canceled 2019-03-25 2019-04-15 2019-05-29 2019-06-26 2019-07-26 2019-08-30 2019-10-13 2020-04-10 Based Selection for institutional development, finance products product development and capacity building Component 2: Export Consultant CS-2-4/20 / Export process IDA / 58790 competitiveness Post Qualification Open - National 20,000.00 0.00 Canceled 2020-04-20 2020-07-27 2020-05-11 2020-06-24 2020-07-24 2020-08-28 2020-11-26 analysis enhancement. Selection Component 2: Export Consultant CS-2-4*/20 / Export Process Under IDA / 58790 competitiveness Post Qualification Open - National 30,000.00 0.00 2020-08-13 2020-08-12 2020-09-03 2020-10-17 2020-11-16 2020-12-21 2021-02-19 Analysis Implementation enhancement. Selection CS-2-21/20 / The consultancy to support export Component 2: Export Consultant Under value added production and IDA / 58790 competitiveness Post Qualification Open - National 50,000.00 0.00 2020-10-01 2020-10-19 2020-10-22 2020-12-05 2021-01-04 2021-02-08 2021-06-08 Implementation create a favorable tax enhancement. Selection environment CS-2-23/20 / Research and Component 2: Export Consultant recommendations on available Under IDA / 58790 competitiveness Post Qualification Open - National 50,000.00 0.00 2020-10-01 2020-12-08 2020-10-22 2020-12-05 2021-01-04 2021-02-08 2021-06-08 opportunities and actual Implementation enhancement. Selection export in service trade CS-2-24/20 / The consultancy to identify unofficial export data and Component 2: Export Consultant Under develop the recommendations IDA / 58790 competitiveness Post Qualification Open - National 30,000.00 0.00 2020-10-01 2020-10-19 2020-10-22 2020-12-05 2021-01-04 2021-02-08 2021-05-09 Implementation (on border points of Russian enhancement. Selection Federation and People's Republic of China) CS-3-27/20 / The Consultant Component 3: Project consultancy for external IDA / 58790 Post Qualification Open - National 30,000.00 0.00 Canceled 2020-11-01 2020-11-22 2021-01-05 2021-02-04 2021-03-11 2021-03-23 Implementation Support auditing and monitoring Selection CS-2-5A/20 / Market Component 2: Export Consultant research for exporting meat IDA / 58790 competitiveness Post Qualification Open - National 100,000.00 0.00 Canceled 2020-09-15 2020-10-06 2020-11-19 2020-12-19 2021-01-23 2021-05-23 and meat products enhancement. Selection CS-2-5B/20 / Market Component 2: Export Consultant research for exporting fruit IDA / 58790 competitiveness Post Qualification Open - National 100,000.00 0.00 Canceled 2020-03-25 2020-04-15 2020-05-29 2020-06-28 2020-08-02 2021-01-29 and dairy products enhancement. Selection CS-2-5C/20 / Market Component 2: Export Consultant research for exporting natural IDA / 58790 competitiveness Post Qualification Open - National 100,000.00 0.00 Canceled 2020-03-25 2020-04-15 2020-05-29 2020-06-28 2020-08-02 2021-01-29 fibers and byproducts enhancement. Selection Page 2 CS-2-18/21 / Market reseach for potential exporting possibility of major Component 2: Export Consultant Pending well known unique IDA / 58790 competitiveness Post Qualification Open - National 60,000.00 0.00 2021-05-17 2021-06-07 2021-07-21 2021-08-20 2021-09-24 2021-12-23 Implementation agricultural products of enhancement. Selection Mongolia on consumer preferences and statutory requirements CS-2-19/21 / Prime Meat Component 2: Export Consultant Market Research for new Pending IDA / 58790 competitiveness Post Qualification Open - National 80,000.00 0.00 2021-05-17 2021-06-07 2021-07-21 2021-08-20 2021-09-24 2021-12-23 market opportunities other Implementation enhancement. Selection than China CS-2-20/21 / Market Component 2: Export Consultant research for export oriented Pending IDA / 58790 competitiveness Post Qualification Open - National 45,000.00 0.00 2021-05-17 2021-06-07 2021-07-21 2021-08-20 2021-09-24 2021-12-23 (potential) food products and Implementation enhancement. Selection its export requirements CS-2-21/21 / Market research for exporting crop Component 2: Export Consultant Pending products from Mongolia on IDA / 58790 competitiveness Post Qualification Open - National 45,000.00 0.00 2021-05-21 2021-06-11 2021-07-25 2021-08-24 2021-09-28 2021-12-27 Implementation consumer preferences and enhancement. Selection statutory requirements CS-1-2/21 / International Component 1: Development Consultant Consultancy service to provide Pending IDA / 58790 of a new line of export Post Qualification Open - National 72,000.00 0.00 2021-05-21 2021-06-11 2021-07-25 2021-08-24 2021-09-28 2022-03-27 information service on export Implementation finance products Selection credit insurance INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EDP/3/CS/001 / Training coordinator for sub- component 2.1. During the first year, the contract shall be Individual signed with a consultant for Component 3: Project IDA / 58790 Post Consultant Open 57,000.00 13,800.00 Completed 2017-02-13 2017-02-02 2017-02-16 2017-02-20 2017-02-16 2017-02-20 2017-02-20 2017-02-20 2021-02-19 2019-02-28 the duration of 12 months, Implementation Support Selection with 3 months probationary period. The contract will be extended on annual basis for next 3 years. EDP/1/CS/003 / Short term senior international consultants for institutional Component 1: Development Individual development of EID (EIS) IDA / 58790 of a new line of export Prior Consultant Open 60,000.00 0.00 Canceled 2017-06-05 2017-07-24 2017-08-14 2017-09-18 2018-01-16 which will provide finance products Selection international best practices in export trade credit insurance and product development EDP/1/CS/004 / Short term consultant to conduct Component 1: Development Individual assesment on existing export IDA / 58790 of a new line of export Prior Consultant Open 40,000.00 13,500.00 Completed 2017-06-05 2020-03-24 2017-07-24 2018-01-22 2017-08-14 2020-05-27 2017-09-18 2018-01-22 2018-03-17 2019-01-21 insurance related mongolian finance products Selection laws, rules and regulations jointly with EID staff EDP/1/CS/005 / Resident Component 1: Development Individual advisor/international expert IDA / 58790 of a new line of export Prior Consultant Open 80,000.00 0.00 Canceled 2018-02-05 2018-03-10 2018-03-31 2018-04-06 2019-04-06 on trade credit insurance finance products Selection EDP/1/CS/006 / Short term senior international consultants for institutional Component 1: Development Individual development of EID (EIS) IDA / 58790 of a new line of export Post Consultant Open 40,000.00 0.00 Canceled 2018-02-05 2018-03-26 2018-04-16 2018-05-21 2018-08-19 pricing methodology, finance products Selection underwriting guidelines, optimization of claim payment and recovery processes) EDP/2-1/CS/003 / Local consultants/Trainers to share Component 2: Export Individual experience, know-how, IDA / 58790 competitiveness Post Consultant Open 20,000.00 2,400.00 Completed 2017-06-05 2017-06-06 2017-07-24 2017-07-05 2017-08-14 2017-07-05 2017-09-18 2017-07-05 2017-12-17 2017-07-31 seminars on export enhancement. Selection development (multiple contracts) EDP/2-1/CS/004 / Component 2: Export Individual Consultants/Hiring sign IDA / 58790 competitiveness Post Consultant Open 1,000.00 0.00 Canceled 2017-06-05 2017-07-08 2017-07-29 2017-09-02 2018-09-02 language interpreters enhancement. Selection (multiple contracts) EDP/2-2/CS/002 / MGF Component 2: Export Individual Business Development IDA / 58790 competitiveness Prior Consultant Open 89,400.00 34,800.00 Completed 2017-03-27 2017-06-05 2017-05-15 2017-04-11 2017-06-05 2020-03-24 2017-07-10 2017-04-11 2021-07-09 2018-04-10 Specialist (Local consultant) enhancement. Selection EDP/1/CS/001 / Coordinating consultant/Local Component 1: Development consultant of Comp#1 for IDA / 58790 of a new line of export Prior Direct Selection Direct 36,000.00 0.00 Canceled 2017-04-03 2017-04-13 2017-06-17 2017-12-14 supporting AgRe (duration of finance products 2 years) EDP/1/CS/0001 / Coordinating consultant/Local Component 1: Development Individual consultant of Comp#1 for IDA / 58790 of a new line of export Prior Consultant Direct 36,000.00 47,550.00 Completed 2017-05-01 2017-06-12 2017-05-11 2017-05-10 2017-06-01 2020-07-29 2017-07-06 2017-05-10 2018-01-02 2019-12-31 supporting AgRe (duration of finance products Selection 2 years) EDP/2-2/CS/004 / IT consulting firm to develop customized registration Component 2: Export system-Matching Grant IDA / 58790 competitiveness Prior Direct Selection Direct 6,000.00 0.00 Canceled 2017-04-03 2017-03-28 2017-04-13 2017-06-01 2017-08-30 Administration System (MGAS) enhancement. for recording all MG related activities, including maitenance fee Page 3 EDP/3/CS/003 / National IT consulting firm for development of Project Implementation Monitoring Component 3: Project IDA / 58790 Prior Direct Selection Direct 14,000.00 0.00 Canceled 2017-06-05 2017-03-28 2017-06-15 2017-08-19 2017-09-18 Information System (PIMIS) for Implementation Support monitoring overall project activities, including maintenance fee EDP/3/CS/005 / Employment Individual of PIU staff: Project Component 3: Project IDA / 58790 Prior Consultant Direct 120,000.00 3,738.33 Completed 2017-06-21 2017-06-23 2017-07-01 2017-06-29 2017-07-22 2020-03-25 2017-08-26 2017-06-29 2018-02-22 2019-06-30 Coordinator (duration of 4 Implementation Support Selection years) EDP/3/CS/006 / Employment Individual Component 3: Project of PIU staff: Procurement IDA / 58790 Prior Consultant Direct 86,400.00 1,403.38 Completed 2017-06-21 2017-06-23 2017-07-01 2017-06-29 2017-07-22 2020-03-25 2017-08-26 2017-06-29 2018-02-22 2018-06-30 Implementation Support specialist (duration of 4 years) Selection EDP/3/CS/007 / Employment Individual of PIU staff: Financial Component 3: Project IDA / 58790 Prior Consultant Direct 86,400.00 2,723.23 Completed 2017-06-21 2017-06-23 2017-07-01 2017-06-29 2017-07-22 2020-03-25 2017-08-26 2017-06-29 2018-02-22 2019-06-30 Management Specialist Implementation Support Selection (duration of 4 years) EDP/3/CS/008 / Employment Individual of PIU staff: Monitoring and Component 3: Project IDA / 58790 Prior Consultant Direct 86,400.00 1,343.76 Completed 2017-06-21 2017-06-23 2017-07-01 2017-06-29 2017-07-22 2020-05-27 2017-08-26 2017-06-29 2018-02-22 2018-06-30 Evaluation Specialist (duration Implementation Support Selection of 4 years) EDP/3/CS/009 / Employment Individual Component 3: Project of PIU staff: Procurement IDA / 58790 Prior Consultant Direct 72,000.00 857.55 Terminated 2017-06-21 2017-06-23 2017-07-01 2017-06-29 2017-07-22 2020-05-27 2017-08-26 2017-06-29 2018-02-22 Implementation Support assistant (duration of 4 years) Selection EDP/1/CS/0002 / Consultant to conduct comprehensive research along with client Component 1: Development Individual survey focusing on SME's on IDA / 58790 of a new line of export Post Consultant Open 60,000.00 38,550.00 Completed 2017-08-04 2017-08-11 2017-09-22 2017-09-21 2017-10-13 2017-10-20 2017-11-17 2017-10-20 2018-05-16 2017-12-23 the market demand in the finance products Selection areas of export insurance products EDP/2-2/CS/001 / Component 2: Export Individual International consultant/MGF IDA / 58790 competitiveness Prior Consultant Open 120,000.00 0.00 Canceled 2017-06-05 2017-03-17 2017-07-24 2017-08-14 2017-09-18 2018-09-18 coordinator to support MGF enhancement. Selection team EDP/2-2/CS/005 / MGF Component 2: Export Individual Business Development IDA / 58790 competitiveness Prior Consultant Open 90,000.00 18,000.00 Terminated 2017-08-14 2017-08-15 2017-10-02 2017-10-12 2017-10-23 2020-03-25 2017-11-27 2017-10-12 2018-05-26 Specialist (Local consultant- enhancement. Selection Finance) EDP/2-2/CS/006 / MGF Component 2: Export Individual Business Development IDA / 58790 competitiveness Prior Consultant Open 90,000.00 36,000.00 Completed 2017-08-14 2017-08-15 2017-10-02 2017-09-06 2017-10-23 2020-05-27 2017-11-27 2017-09-06 2018-05-26 2018-09-05 Specialist (Local Consultant- enhancement. Selection Marketing) EDP/2-2/CS/007 / National consultants (2) for conducting Component 2: Export Individual market research for IDA / 58790 competitiveness Post Consultant Open 4,000.00 4,000.00 Completed 2017-08-14 2017-08-01 2017-10-02 2017-08-23 2017-10-23 2017-08-30 2017-11-27 2017-08-30 2018-05-26 2017-11-30 component 2 "Export enhancement. Selection competitiveness enhancement". EDP/2-2/CS/0001 / Component 2: Export Individual International consultant/MGF IDA / 58790 competitiveness Prior Consultant Open 120,000.00 0.00 Canceled 2017-08-14 2017-08-08 2017-10-02 2017-10-23 2017-11-27 2018-05-26 coordinator to support MGF enhancement. Selection team EDP/2-1/CS/001 / Consultancy service on conducting export-related Component 2: Export Individual research which would benefit IDA / 58790 competitiveness Post Consultant Open 50,000.00 5,400.00 Terminated 2017-09-11 2017-10-12 2017-10-30 2017-11-27 2017-11-20 2017-11-27 2017-12-25 2017-11-27 2018-12-25 specific export-oriented enhancement. Selection industries or other group of exporters (multiple contracts) EDP/2-1/CS/002 / International consultants/Trainers to share Component 2: Export Individual experience, know-how, IDA / 58790 competitiveness Post Consultant Open 60,000.00 9,550.00 Completed 2017-09-18 2017-09-13 2017-11-06 2017-10-03 2017-11-27 2017-10-03 2018-01-01 2017-10-03 2019-01-01 2018-01-22 seminars on export enhancement. Selection development (multiple contracts) EDP/2-2/CS/009 / National consultant to develop public Component 2: Export Individual awareness framework for IDA / 58790 competitiveness Post Consultant Open 1,000.00 0.00 Canceled 2017-10-31 2017-12-26 2018-01-16 2018-02-20 2018-08-19 component 2.2 "Matching enhancement. Selection Grant Facility" of the Export Development project EDP/2-2/CS/1 / International Component 2: Export Individual consultant to support MGF IDA / 58790 competitiveness Prior Consultant Open 60,000.00 25,400.00 Completed 2017-12-25 2017-12-18 2018-02-12 2018-03-23 2018-03-05 2020-03-25 2018-04-09 2018-04-12 2018-10-06 2018-11-13 team enhancement. Selection EDP/2-2/CS/01 / Component 2: Export Individual International consultant/MGF IDA / 58790 competitiveness Prior Consultant Open 110,000.00 0.00 Canceled 2017-08-21 2017-08-17 2017-10-09 2017-10-30 2017-12-04 2018-12-04 coordinator to support MGF enhancement. Selection team EDP/1/CS/007 / Short term consultant for Institutional development of EID (EIS) Component 1: Development which will provide IDA / 58790 of a new line of export Prior Direct Selection Direct 60,000.00 0.00 Canceled 2018-03-26 2018-04-05 2018-06-02 2018-08-01 international best practices in finance products export trade credit insurance, including product development EDP/2-1/CS/006 / Short term International consultant Component 2: Export to deliver an intensive course IDA / 58790 competitiveness Post Direct Selection Direct 17,500.00 17,500.00 Completed 2018-03-12 2018-03-06 2018-03-22 2018-03-06 2018-05-26 2018-03-06 2018-06-25 2018-06-18 for Mongolian Professional enhancement. Tour Guides Page 4 EDP/2-1/CS/007 / National Component 2: Export Individual consultant to assist the IDA / 58790 competitiveness Post Consultant Open 8,400.00 8,400.00 Terminated 2018-03-26 2018-03-06 2018-05-14 2018-03-14 2018-06-04 2018-03-14 2018-07-09 2018-03-14 2019-07-09 training coordination and enhancement. Selection logistics EDP/21/CS/008 / National consultant to develop e- Component 1: Development Individual learning training module on IDA / 58790 of a new line of export Post Consultant Open 4,500.00 3,000.00 Completed 2018-04-30 2018-05-07 2018-06-18 2018-05-25 2018-07-09 2018-05-28 2018-08-13 2018-05-28 2018-11-11 2018-08-06 Foreign Trade: Module#1-The finance products Selection export cycle EDP/1/CS/010 / International consultant on Institutional Development of Export Credit Component 1: Development Individual Insurance in Mongolia. The IDA / 58790 of a new line of export Post Consultant Open 30,000.00 29,850.00 Completed 2018-04-30 2018-05-05 2018-06-18 2018-05-10 2018-07-09 2018-05-17 2018-08-13 2018-05-17 2018-09-12 2018-07-04 consultant will focus on finance products Selection scoping the master service agreement EDP/1/CS/011 / International consultant on Institutional Development of Export Credit Component 1: Development Individual Insurance in Mongolia. The IDA / 58790 of a new line of export Prior Consultant Direct 30,000.00 0.00 Canceled 2018-05-31 2018-06-10 2018-07-01 2018-08-05 2018-09-04 consultant will focus on finance products Selection drafting the TOR and the Master service agreement. EDP/21/CS/009 / National consultant to develop e- Component 1: Development Individual learning training module on IDA / 58790 of a new line of export Post Consultant Open 4,500.00 4,500.00 Completed 2018-04-30 2018-05-07 2018-06-18 2018-05-25 2018-07-09 2018-05-28 2018-08-13 2018-05-28 2018-11-11 2018-09-05 Foreign trade. The consultant finance products Selection will develop module # 2: The Export Management EDP/21/CS/010 / National consultant to develop e- Component 1: Development Individual learning training module on IDA / 58790 of a new line of export Post Consultant Open 4,500.00 4,500.00 Completed 2018-04-30 2018-05-07 2018-06-18 2018-05-25 2018-07-09 2018-05-28 2018-08-13 2018-05-28 2018-11-11 2018-06-12 Foreign Trade: Module#3- finance products Selection Export documentation EDP/21/CS/011 / National consultant to develop e- Component 1: Development Individual learning training module on IDA / 58790 of a new line of export Post Consultant Open 4,500.00 2,250.00 Completed 2018-04-30 2018-05-07 2018-06-18 2018-05-25 2018-07-09 2018-05-28 2018-08-13 2018-05-28 2018-11-11 2018-09-26 Foreign Trade: Module#4- finance products Selection Understand Incoterms Used for International Trade EDP/21/CS/012 / National consultant to develop e- Component 1: Development Individual learning training module on IDA / 58790 of a new line of export Post Consultant Open 4,500.00 4,500.00 Completed 2018-04-30 2018-05-07 2018-06-18 2018-05-25 2018-07-09 2018-05-28 2018-08-13 2018-05-28 2018-11-11 2018-09-26 Foreign Trade: Module#5 - finance products Selection International transport services EDP/21/CS/013 / National consultant to develop e- Component 1: Development Individual learning training module on IDA / 58790 of a new line of export Post Consultant Open 4,500.00 4,500.00 Completed 2018-04-30 2018-05-07 2018-06-18 2018-05-25 2018-07-09 2018-05-28 2018-08-13 2018-05-28 2018-11-11 2018-09-27 Foreign Trade: Module#6 - finance products Selection International trade and trade agreement EDP/21/CS/014 / National consultant to develop e- Component 1: Development Individual learning training module on IDA / 58790 of a new line of export Post Consultant Open 4,500.00 4,500.00 Completed 2018-04-30 2018-05-07 2018-06-18 2018-05-25 2018-07-09 2018-05-28 2018-08-13 2018-05-28 2018-11-11 2018-09-26 Foreign Trade: Module#7 - finance products Selection Tax environment of Mongolia EDP/21/CS/015 / National consultant to design e- learning video course, video Component 1: Development Individual record, upload to the project IDA / 58790 of a new line of export Post Consultant Open 6,750.00 0.00 Canceled 2018-05-14 2018-07-02 2018-07-23 2018-08-27 2018-11-25 website. Senior shooter to finance products Selection record e-learning training course. EDP/21/CS/016 / National consultant to design e- learning video courses, video record and upload to the Component 1: Development Individual project website. The video IDA / 58790 of a new line of export Post Consultant Open 5,400.00 0.00 Canceled 2018-05-28 2018-07-16 2018-08-06 2018-09-10 2018-12-09 shooter to record e-learning finance products Selection training course, design presentations and maintain the website training session. EDP/21/CS/017 / National Component 1: Development Individual consultant to translate e- IDA / 58790 of a new line of export Post Consultant Open 4,500.00 0.00 Canceled 2018-05-28 2018-07-16 2018-08-06 2018-09-10 2018-12-09 learning course from finance products Selection Mongolian to Kazakh language EDP/21/CS/018 / National consultant to translate e- learning course for the Component 2: Export Individual disabled people who has IDA / 58790 competitiveness Post Consultant Open 4,500.00 0.00 Canceled 2018-06-04 2018-07-23 2018-08-13 2018-09-17 2018-12-16 difficulty in speaking and enhancement. Selection listening. The consultant will translate Module 1-3 EDP/21/CS/019 / National consultant to translate e- learning course for the Component 2: Export Individual disabled people who has IDA / 58790 competitiveness Post Consultant Open 4,500.00 0.00 Canceled 2018-06-04 2018-07-23 2018-08-13 2018-09-17 2018-12-16 difficulty in speaking and enhancement. Selection listening. The consultant will translate Module 4-7 EDP/21/CS/020 / National consultant to create database Component 2: Export Individual on Foreign Trade Issues IDA / 58790 competitiveness Post Consultant Open 1,800.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-02-10 including researches, study enhancement. Selection reports, international standards Page 5 EDP/21/CS/021 / National consultant to create database Component 2: Export Individual on Foreign Trade Issues IDA / 58790 competitiveness Post Consultant Open 1,800.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-02-10 including legal framework, enhancement. Selection policies and statistical data EDP/21/CS/022 / Component 2: Export Individual International consultant to IDA / 58790 competitiveness Post Consultant Direct 15,000.00 0.00 Canceled 2018-11-30 2018-12-10 2018-12-31 2019-02-04 2019-04-05 improve cashmere product to enhancement. Selection export EDP/21/CS/023 / National Component 2: Export Individual consultant to mentor the SMEs IDA / 58790 competitiveness Post Consultant Open 6,000.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-02-10 (1-3) in product designing of enhancement. Selection the cashmere product EDP/21/CS/024 / National Component 2: Export Individual consultant to mentor the SMEs IDA / 58790 competitiveness Post Consultant Open 6,000.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-05-11 (4-6) in product designing of enhancement. Selection the cashmere product EDP/21/CS/025 / National Component 2: Export Individual consultant to mentor the SMEs IDA / 58790 competitiveness Post Consultant Open 6,000.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-05-11 (7-9) in product designing of enhancement. Selection the cashmere product EDP/21/CS/026 / National consultant to develop skills and knowledge of SME's IT Component 2: Export Individual staff to develop export. The IDA / 58790 competitiveness Post Consultant Open 7,500.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-05-11 consultant will focus on enhancement. Selection Envanto Market and Themeforest: Coding EDP/21/CS/027 / National consultant to develop skills and knowledge of SME's IT Component 2: Export Individual staff to develop export. The IDA / 58790 competitiveness Post Consultant Open 7,500.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-05-11 consultant will focus on the enhancement. Selection subject of Themeforest: Design EDP/21/CS/028 / National consultant to develop skills Component 2: Export Individual and knowledge of SME's IT IDA / 58790 competitiveness Post Consultant Open 7,500.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-05-11 staff to develop export. The enhancement. Selection consultant will focus on the subject of Upload and Support EDP/21/CS/031 / National consultant to develop Component 2: Export Individual handbook on legal IDA / 58790 competitiveness Post Consultant Open 3,600.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-05-11 environment for Mongolian enhancement. Selection councils and diplomats in abroad. EDP/21/CS/032 / National consultant to develop Component 2: Export Individual handbook on International IDA / 58790 competitiveness Post Consultant Open 3,600.00 0.00 Canceled 2018-08-06 2018-09-24 2018-10-15 2018-11-19 2019-02-17 Standards for Mongolian enhancement. Selection councils and diplomats in abroad. EDP/21/CS/033 / National consultant to develop Component 2: Export Individual handbook on Foreign Trade IDA / 58790 competitiveness Post Consultant Open 3,600.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-02-10 Issues for Mongolian councils enhancement. Selection and diplomats in abroad. EDP/22/CS/012 / MGF Component 2: Export Individual Business Development IDA / 58790 competitiveness Prior Consultant Open 89,400.00 17,400.00 Completed 2018-04-30 2020-03-25 2018-06-18 2018-05-11 2018-07-09 2020-05-28 2018-08-13 2018-05-11 2022-08-12 2019-05-10 Specialist (Local consultant) enhancement. Selection EDP/22/CS/007 / MGF Component 2: Export Individual Administrative Assistant IDA / 58790 competitiveness Post Consultant Open 47,400.00 9,000.00 Terminated 2018-04-30 2017-03-13 2018-05-24 2017-04-10 2018-05-27 2017-04-10 2018-06-02 2017-04-10 2022-06-01 2017-04-10 (Local consultant) enhancement. Selection EDP/3/CS/002 / Environment Individual Component 3: Project and Social screening IDA / 58790 Post Consultant Open 4,500.00 4,500.00 Completed 2018-04-30 2018-03-28 2018-06-02 2018-05-02 2018-06-23 2018-05-02 2018-07-28 2018-06-05 2018-10-26 2018-09-20 Implementation Support consultant Selection EDP/21/CS/034 / International consultant to Component 2: Export Individual conduct 1st part of 3-day IDA / 58790 competitiveness Post Consultant Direct 4,000.00 3,240.00 Completed 2018-04-30 2018-04-23 2018-05-10 2018-05-07 2018-05-31 2018-05-07 2018-07-05 2018-05-07 2018-07-10 2018-05-25 workshop on "Benefits of WTO enhancement. Selection agreements for Mongolian Non-mining Exporters" EDP/21/CS/035 / International consultant to Component 2: Export Individual conduct 2nd part of the 3-day IDA / 58790 competitiveness Post Consultant Direct 4,000.00 3,240.00 Completed 2018-04-30 2018-04-23 2018-05-10 2018-05-07 2018-05-31 2018-05-07 2018-07-05 2018-05-07 2018-07-10 2018-06-18 training on "Benefits of WTO enhancement. Selection agreements for Mongolian Non-mining Exporters". EDP/21/CS/036 / Short term Component 2: Export Individual national consultant to conduct IDA / 58790 competitiveness Post Consultant Open 7,000.00 0.00 Canceled 2018-06-25 2018-08-13 2018-09-03 2018-10-08 2019-01-16 a study on tourism market enhancement. Selection strategy EDP/21/CS/15 / National consultant to design e- learning video course, video Component 1: Development Individual record, upload to the project IDA / 58790 of a new line of export Post Consultant Direct 6,750.00 0.00 Canceled 2018-09-10 2018-09-20 2018-10-11 2018-11-15 2019-05-14 website. Senior shooter to finance products Selection record e-learning training course. Page 6 EDP/21/CS/16 / National consultant to design e- learning video courses, video record and upload to the Component 1: Development Individual project website. The video IDA / 58790 of a new line of export Post Consultant Direct 5,400.00 0.00 Canceled 2018-09-10 2018-09-20 2018-10-11 2018-11-15 2019-05-14 shooter to record e-learning finance products Selection training course, design presentations and maintain the website training session. EDP/21/CS/17 / National Component 1: Development Individual consultant to translate e- IDA / 58790 of a new line of export Post Consultant Direct 4,500.00 0.00 Canceled 2018-09-10 2018-09-20 2018-10-11 2018-11-15 2019-05-14 learning course from finance products Selection Mongolian to Kazakh language EDP/21/CS/18 / National Component 2: Export Individual consultant to translate e- IDA / 58790 competitiveness Post Consultant Direct 4,500.00 0.00 Canceled 2018-09-10 2018-09-20 2018-10-11 2018-11-15 2019-05-14 learning course from enhancement. Selection Mongolian to Kazakh language EDP/21/CS/19 / National Component 2: Export Individual consultant to translate e- IDA / 58790 competitiveness Post Consultant Direct 4,500.00 0.00 Canceled 2018-09-10 2018-09-20 2018-10-11 2018-11-15 2019-05-14 learning course from enhancement. Selection Mongolian to Kazakh language EDP/3/CS/010 / Employment Individual Component 3: Project of PIU : Procurement Specialist IDA / 58790 Prior Consultant Open 86,400.00 1,489.74 Completed 2018-09-24 2018-09-12 2018-11-12 2018-08-30 2018-12-03 2020-03-25 2019-01-07 2018-08-30 2023-01-06 2019-06-30 Implementation Support (duration 4 years) Selection EDP/3/CS/011 / Employment Individual of PIU Staff: Procurement Component 3: Project IDA / 58790 Prior Consultant Open 72,000.00 676.12 Terminated 2018-09-24 2018-09-12 2018-11-12 2018-08-30 2018-12-03 2020-05-27 2019-01-07 2018-08-30 2023-01-06 Assistant ( duration of 4 Implementation Support Selection years) Individual EDP/3/CS/08 / Monitoring Component 3: Project IDA / 58790 Prior Consultant Open 86,400.00 16,686.10 Terminated 2018-10-22 2020-05-27 2018-12-10 2018-11-01 2018-12-31 2020-06-12 2019-02-04 2018-11-01 2019-08-03 and evaluation specialist Implementation Support Selection EDP/2-1/CS/07 / National Component 2: Export Individual consultant to assist the IDA / 58790 competitiveness Post Consultant Open 8,400.00 8,400.00 Completed 2018-03-06 2018-02-27 2018-04-24 2018-06-18 2018-05-15 2018-06-18 2018-06-19 2018-06-18 2019-06-19 2019-06-21 training coordination and enhancement. Selection logistics Component 2: Export Individual EDP/22/CS/008 / MGF IDA / 58790 competitiveness Post Consultant Open 9,000.00 9,000.00 Terminated 2017-03-17 2017-03-13 2017-04-23 2018-01-15 2017-04-28 2018-01-15 2017-05-17 2018-01-15 2018-05-17 Administrative Assistant enhancement. Selection Component 2: Export Individual EDP/22/CS/009 / MGF IDA / 58790 competitiveness Post Consultant Open 9,000.00 11,160.00 Completed 2017-03-17 2017-03-31 2018-01-14 2018-10-04 2018-01-15 2018-10-04 2018-02-05 2018-10-04 2018-08-04 2019-12-31 Administrative Assistant enhancement. Selection Component 2: Export Individual EDP/22/CS/010 / MGF IDA / 58790 competitiveness Post Consultant Open 9,000.00 9,000.00 Terminated 2017-03-17 2017-03-17 2018-09-25 2017-05-03 2018-09-26 2017-05-03 2018-10-18 2017-05-03 2019-04-16 Administrative Assistant enhancement. Selection EDP/2-2/CS/003 / MGF Component 2: Export Individual Administrative Assistant IDA / 58790 competitiveness Post Consultant Open 47,400.00 9,000.00 Terminated 2017-03-06 2017-03-13 2017-03-30 2017-04-10 2017-04-02 2017-04-10 2017-04-08 2017-04-10 2021-04-07 (Local consultant) enhancement. Selection Individual EDP/3/CS/8 / Monitoring and Component 3: Project IDA / 58790 Prior Consultant Open 86,400.00 0.00 Canceled 2018-09-26 2018-11-14 2018-12-05 2019-01-09 2020-01-09 Evaluation Specialist Implementation Support Selection EDP/21/CS/20 / International Component 2: Export Individual consultant to review and IDA / 58790 competitiveness Post Consultant Open 40,000.00 0.00 Canceled 2018-11-27 2019-01-15 2019-02-05 2019-03-12 2019-09-08 support the training enhancement. Selection component EDP/2-1/CS/010 / Component 2: Export Individual International consultant to IDA / 58790 competitiveness Post Consultant Open 70,000.00 0.00 Canceled 2018-11-27 2019-01-15 2019-02-05 2019-03-12 2019-09-08 advice and support the enhancement. Selection matching grants facility EDP/1/CS/012 / International consultant to draft the detailed TOR for the Master Component 1: Development Service Agreement and IDA / 58790 of a new line of export Prior Direct Selection Direct 80,000.00 0.00 Canceled 2018-11-27 2018-12-07 2019-02-10 2019-08-09 provide related capacity finance products building and support to the Mongolian National Reinsurance Company EDP/2-2/CS/008 / MGF Component 2: Export Individual Business Development IDA / 58790 competitiveness Prior Consultant Open 54,000.00 18,000.00 Terminated 2017-12-21 2020-03-25 2018-02-08 2018-01-10 2018-03-01 2020-05-28 2018-04-05 2018-01-10 2018-10-02 Specialists (3-year contract) enhancement. Selection EDP/2-2/CS/010 / MGF Component 2: Export Individual Business Development IDA / 58790 competitiveness Prior Consultant Open 54,000.00 18,000.00 Completed 2017-12-21 2020-03-25 2018-02-08 2018-01-10 2018-03-01 2020-06-30 2018-04-05 2018-01-10 2018-10-02 2019-01-10 Specialists (3-year contract) enhancement. Selection EDP/3/CS/02 / Environmental and Social Component 3: Project IDA / 58790 Prior Direct Selection Direct 54,000.00 0.00 Canceled 2018-11-15 2018-11-25 2019-01-29 2019-07-28 screening consultant (duration Implementation Support of 3 years) Individual CS-3-10/20 / PIU Business Component 3: Project IDA / 58790 Post Consultant Open 27,250.00 11,718.12 Signed 2020-03-25 2020-04-09 2020-05-13 2020-05-14 2020-06-03 2020-05-25 2020-06-24 2020-05-18 2021-06-30 development specialist Implementation Support Selection Individual CS-3-11/20 / Export market Component 3: Project IDA / 58790 Post Consultant Open 27,250.00 8,421.12 Signed 2020-03-25 2020-03-27 2020-05-13 2020-05-14 2020-06-03 2020-05-18 2020-06-24 2020-05-18 2021-06-30 analyst Implementation Support Selection CS-3-12/20 / PIU Office Individual Component 3: Project manager- administrative IDA / 58790 Post Consultant Open 13,250.00 4,894.78 Signed 2020-03-25 2020-04-09 2020-05-13 2020-05-15 2020-06-03 2020-05-25 2020-06-24 2020-05-25 2021-06-30 Implementation Support assistant Selection Individual CS-3-13/20 / Training and Component 3: Project IDA / 58790 Post Consultant Open 21,000.00 8,105.33 Signed 2020-03-25 2020-04-09 2020-05-13 2020-05-15 2020-06-03 2020-05-15 2020-06-24 2020-05-18 2021-06-30 expo consultant Implementation Support Selection Page 7 Individual CS-3-14/20 / Sanitary and Component 3: Project IDA / 58790 Post Consultant Open 27,000.00 8,105.33 Signed 2020-03-25 2020-04-20 2020-05-13 2020-05-29 2020-06-03 2020-05-29 2020-06-24 2020-05-29 2021-06-19 Phytosanitary Specialist Implementation Support Selection CS-3-15/20 / Environment Individual Component 3: Project and social impact assessment IDA / 58790 Post Consultant Open 18,000.00 8,105.33 Signed 2020-03-25 2020-04-09 2020-05-13 2020-05-17 2020-06-03 2020-05-17 2020-06-24 2020-05-27 2021-06-19 Implementation Support consultant Selection Component 1: Development Individual CS-1-1/20 / Coordinating IDA / 58790 of a new line of export Post Consultant Open 18,000.00 17,239.08 Signed 2019-01-02 2020-04-23 2019-01-02 2020-01-01 2019-01-02 2020-01-01 2019-01-02 2020-01-01 2019-12-28 consultant for Component 1 finance products Selection Individual Component 3: Project Under CS-3-6/20 / PIU coordinator IDA / 58790 Prior Consultant Open 29,500.00 0.00 2020-01-10 2020-02-21 2020-03-13 2021-04-23 2020-04-06 2021-06-30 Implementation Support Implementation Selection Individual CS-3-7/20 / PIU Component 3: Project Under IDA / 58790 Prior Consultant Open 25,000.00 0.00 2020-01-10 2021-03-31 2020-02-21 2020-02-14 2020-03-13 2020-04-06 2021-06-30 procurement specialist Implementation Support Implementation Selection Individual CS-3-8/20 / PIU financial Component 3: Project Under IDA / 58790 Prior Consultant Open 25,000.00 0.00 2020-01-10 2021-03-31 2020-02-21 2020-03-13 2020-04-06 2021-06-30 specialist Implementation Support Implementation Selection CS-2-3/20 / Needs Component 2: Export Individual assessment and analysis of IDA / 58790 competitiveness Post Consultant Direct 6,000.00 5,866.94 Completed 2020-03-25 2020-03-25 2020-04-04 2020-03-31 2020-04-18 2020-05-09 2020-04-13 2020-05-30 2020-06-02 barrier hindering small and enhancement. Selection medium enterprises’ exports Individual CS-3-9/20 / PIU M&E Component 3: Project IDA / 58790 Post Consultant Open 25,000.00 4.54 Signed 2020-01-10 2020-01-02 2020-02-21 2020-02-18 2020-03-13 2020-02-25 2020-04-06 2020-03-02 2021-06-30 specialist Implementation Support Selection Individual CS-3-16/20 / Business Component 3: Project IDA / 58790 Post Consultant Open 16,800.00 8,119.42 Signed 2020-07-01 2020-07-03 2020-08-19 2020-04-27 2020-09-09 2020-06-24 2020-10-14 2020-07-09 2021-04-12 Development Consultant Implementation Support Selection Individual CS-3-17/20 / Business Component 3: Project Under IDA / 58790 Post Consultant Open 16,800.00 0.00 2020-05-31 2020-07-09 2020-07-19 2020-08-09 2020-09-13 2021-03-12 Development Consultant Implementation Support Implementation Selection Individual CS-3-18/20 / Business Component 3: Project Under IDA / 58790 Post Consultant Open 16,800.00 0.00 2020-07-01 2020-07-03 2020-08-19 2020-09-09 2020-10-14 2021-04-12 Development Consultant Implementation Support Implementation Selection CS-3-19/20 / Associate Individual Component 3: Project Business Development IDA / 58790 Post Consultant Open 14,400.00 6,947.42 Signed 2020-07-01 2020-07-05 2020-08-19 2020-06-30 2020-09-09 2020-07-06 2020-10-14 2020-07-06 2021-04-12 Implementation Support Consultant Selection EDP/2-1/CS/01 / Consultancy service on conducting export-related Component 2: Export Individual research which would benefit IDA / 58790 competitiveness Post Consultant Open 50,000.00 4,500.00 Completed 2017-11-27 2017-10-12 2018-01-15 2017-11-27 2018-02-05 2017-11-27 2018-03-12 2017-11-27 2018-09-08 2018-02-28 specific export-oriented enhancement. Selection industries or other group of exporters (multiple contracts) EDP/2-1/CS/1 / Consultancy service on conducting export- related research which would Component 2: Export Individual benefit specific export- IDA / 58790 competitiveness Post Consultant Open 50,000.00 4,500.00 Completed 2017-11-27 2017-10-12 2018-01-15 2017-11-27 2018-02-05 2017-11-27 2018-03-12 2017-11-27 2018-09-08 2018-02-28 oriented industries or other enhancement. Selection group of exporters (multiple contracts) EDP/2-1/CS/0001 / Consultancy service on conducting export-related Component 2: Export Individual research which would benefit IDA / 58790 competitiveness Post Consultant Open 50,000.00 4,500.00 Completed 2017-11-27 2017-10-12 2018-01-15 2017-11-22 2018-02-05 2017-11-22 2018-03-12 2017-11-27 2018-09-08 2018-02-28 specific export-oriented enhancement. Selection industries or other group of exporters (multiple contracts) EDP/3/CS/11 / Employment Individual Component 3: Project of PIU staff: Procurement IDA / 58790 Post Consultant Open 18,000.00 954.49 Terminated 2017-06-18 2018-07-18 2017-08-06 2018-01-12 2017-08-27 2018-01-16 2017-10-01 2018-01-16 2018-03-30 Implementation Support assistant Selection EDP/1/CS/04 / Short term consultant to conduct assessment on existing Component 1: Development Individual export insurance related IDA / 58790 of a new line of export Post Consultant Open 40,000.00 11,000.00 Completed 2018-01-22 2017-12-21 2018-03-12 2018-01-15 2018-04-02 2018-01-22 2018-05-07 2018-01-22 2018-11-03 2018-10-22 mongolian laws, rules and finance products Selection regulations jointly with EID staff EDP/3/CS/2 / Environmental Individual and Social screening Component 3: Project IDA / 58790 Post Consultant Direct 54,000.00 0.00 Canceled 2018-05-02 2018-05-12 2018-06-02 2018-07-07 2019-01-03 consultant (duration of 3 Implementation Support Selection years) EDP/3/CS/0002 / Individual Environmental and Social Component 3: Project IDA / 58790 Post Consultant Open 54,000.00 4,500.00 Terminated 2018-05-02 2018-04-04 2018-06-20 2018-05-01 2018-07-11 2018-05-01 2018-08-15 2018-05-02 2019-02-11 screening consultant (duration Implementation Support Selection of 3 years) CS-2-22A/20 / Logistics Centers’ Development Plan for Component 2: Export Individual Under Agricultural Commodity IDA / 58790 competitiveness Post Consultant Open 10,000.00 0.00 2020-08-30 2020-10-19 2020-10-18 2020-11-08 2020-12-13 2021-03-13 Implementation Exchange to support export of enhancement. Selection agricultural raw materials CS-2-22B/20 / Analysis and Development Plan for Component 2: Export Individual Under Agricultural Commodity IDA / 58790 competitiveness Post Consultant Open 10,000.00 0.00 2020-08-30 2020-10-19 2020-10-14 2020-11-04 2020-12-09 2021-03-09 Implementation Exchange to support export of enhancement. Selection agricultural raw materials CS-2-28/20 / The Component 2: Export consultancy to develop an IDA / 58790 competitiveness Post Direct Selection Direct 15,000.00 14,999.54 Signed 2020-11-30 2020-12-02 2020-12-10 2020-12-02 2021-02-13 2021-01-07 2022-02-13 electronic system of Effective enhancement. Partnership Schemes Page 8 CS-1-2A/20 / Product Development of Export Credit Insurance in Mongolia (international) Component 1: Development Individual IDA / 58790 of a new line of export Post Consultant Open 40,000.00 40,000.00 Signed 2020-08-20 2020-08-25 2020-10-08 2020-12-31 2020-10-29 2021-03-05 2020-12-03 2021-03-08 2021-02-01 Product Development of finance products Selection Export Credit Insurance in Mongolia (international) CS-1-2B/20 / Product Component 1: Development Individual Development of Export Credit IDA / 58790 of a new line of export Post Consultant Open 40,000.00 40,000.00 Signed 2020-08-20 2020-08-25 2020-10-08 2020-12-31 2020-10-29 2021-03-05 2020-12-03 2021-03-08 2021-02-01 Insurance in Mongolia finance products Selection (international) CS-3-20/20 / The study on the economic impact assessment of the Free Trade Agreement between Mongolia Component 2: Export Individual Under and Euro Asian Economic IDA / 58790 competitiveness Post Consultant Open 20,000.00 0.00 2020-08-20 2020-08-28 2020-10-08 2020-10-29 2020-12-03 2021-03-03 Implementation Union and the development of enhancement. Selection National Benchmarking Mechanism for Products and Services Individual CS-3-26/20 / Legal Component 3: Project IDA / 58790 Post Consultant Open 18,000.00 18,000.90 Signed 2020-08-20 2020-09-07 2020-10-04 2020-12-28 2020-10-25 2020-12-31 2020-11-29 2021-01-31 2021-11-29 consultant Implementation Support Selection CS-1-2/20 / New Product Component 1: Development Individual Development of Export Credit IDA / 58790 of a new line of export Post Consultant Open 40,000.00 0.00 Canceled 2020-03-25 2020-05-13 2020-06-03 2020-07-08 2021-01-04 Insurance in Mongolia finance products Selection (international) CS-3-25/20 / The consultancy to strengthen Component 3: Strengthening certification services and IDA / 58790 Certification Services and Prior Direct Selection Direct 2,000,000.00 0.00 Under Review 2020-11-30 2020-12-17 2021-02-20 2023-12-31 quality management Quality Management (international) Individual CS-4-17/21 / Business Component 3: Project IDA / 58790 Post Consultant Open 18,000.00 8,105.33 Signed 2021-01-15 2020-07-03 2021-03-05 2020-06-30 2021-03-26 2020-07-06 2021-04-30 2020-07-15 2022-04-30 Development Consultant Implementation Support Selection CS-4-15/21 / Environment Individual Component 3: Project and social impact assessment IDA / 58790 Post Consultant Open 18,000.00 19,996.72 Signed 2021-01-15 2021-03-03 2021-03-05 2020-12-02 2021-03-26 2020-12-30 2021-04-16 2020-12-30 2022-04-11 Implementation Support consultant Selection Individual Component 3: Project Under CS-4-6/21 / PIU Coordinator IDA / 58790 Prior Consultant Open 22,000.00 0.00 2021-02-09 2021-02-24 2021-03-30 2020-02-14 2021-04-20 2021-05-21 2021-05-25 2022-05-25 Implementation Support Implementation Selection Individual CS-4-1/21 / PIU Monitoring Component 3: Project Under IDA / 58790 Post Consultant Open 16,440.00 0.00 2021-01-15 2021-03-03 2021-03-05 2021-03-26 2021-04-30 2022-04-30 and Evaluation Specialist Implementation Support Implementation Selection Individual CS-4-29/21 / Export Market Component 3: Project Under IDA / 58790 Post Consultant Open 17,000.00 0.00 2021-03-03 2021-03-04 2021-04-21 2021-05-12 2021-06-16 2022-06-16 Analyst Implementation Support Implementation Selection Individual CS-4-38/21 / PIU Financial Component 3: Project Under IDA / 58790 Post Consultant Open 15,000.00 0.00 2021-03-05 2021-03-04 2021-04-23 2021-05-14 2021-06-18 2021-12-31 Management Specialist Implementation Support Implementation Selection CS-4-32/21 / National consultant for Export competitiveness for co- Component 3: Project Under IDA / 58790 Post Direct Selection Direct 20,000.00 0.00 2021-03-26 2021-04-05 2021-04-05 2021-06-09 2022-06-30 handling the overall Implementation Support Implementation component 2 and development of relevant TORs Individual CS-4-16/21 / Business Component 3: Project Under IDA / 58790 Post Consultant Open 20,400.00 0.00 2021-04-12 2021-04-14 2021-05-31 2021-06-21 2021-07-26 2021-12-31 Development Consultant Implementation Support Implementation Selection Individual CS-4-39/21 / Business Component 3: Project Under IDA / 58790 Post Consultant Open 20,400.00 0.00 2021-04-12 2021-04-14 2021-05-31 2021-06-21 2021-07-26 2021-12-31 Development Consultant Implementation Support Implementation Selection CS-1-1/21 / International consultant to support Component 1: Development Individual Pending Mongolian Re for export IDA / 58790 of a new line of export Post Consultant Open 40,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2022-01-31 Implementation credit insurance operation and finance products Selection enhancement CS-2-12/21 / Undertake market intelligence studies for specific market segments like Adventure tourism (for Component 2: Export Individual Pending backpacker/over-lander IDA / 58790 competitiveness Post Consultant Open 45,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2022-12-30 Implementation markets, EU market, USA enhancement. Selection market, Asian markets) and recommend potential tourism products (international) CS-2-13/21 / Undertake baseline survey on creative industry on art, paintings, hand made products and Component 2: Export Individual Pending tangible/intangible heritage IDA / 58790 competitiveness Post Consultant Open 45,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2022-12-30 Implementation products and provide general enhancement. Selection assistance on how to market the products being developed (international) Page 9 CS-2-14/21 / Study on the impact of Mongolia's accession to the Asia-Pacific Trade Agreement on its Component 2: Export Individual exports and recommendations Pending IDA / 58790 competitiveness Post Consultant Open 15,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2022-04-30 on Mongolia's negotiating Implementation enhancement. Selection position for the 5th round of negotiations for the increase and diversification of its exports. CS-2-15/21 / Study on the impact on exports of Component 2: Export Individual Pending Mongolia's accession to the IDA / 58790 competitiveness Post Consultant Open 15,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2022-04-30 Implementation Comprehensive Regional enhancement. Selection Partnership Agreement CS-2-16/21 / Prepare a draft Component 2: Export Individual Pending regulation on anti-dumping IDA / 58790 competitiveness Post Consultant Open 10,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2021-12-28 Implementation and countervailing measures. enhancement. Selection CS-2-17/21 / Study on the impact of the future Economic Partnership Agreement Component 2: Export Individual Pending between Mongolia and the IDA / 58790 competitiveness Post Consultant Open 7,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2021-11-28 Implementation Republic of Korea on enhancement. Selection mongolian exports, in particular SMEs (international) CS-2-22/21 / National consultant to conduct gap analysis of existing all trade Component 2: Export Individual Pending legislation and regulation in IDA / 58790 competitiveness Post Consultant Open 20,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2021-11-28 Implementation Mongolia and recommend enhancement. Selection possible trade and investment policy CS-2-23/21 / National consultant to conduct a Component 2: Export Individual feasibility study and a needs Pending IDA / 58790 competitiveness Post Consultant Open 20,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2022-01-31 assessment on e-commerce Implementation enhancement. Selection law and regulation in Mongolia CS-2-24/21 / National consultant to develop a Component 2: Export Individual manual for SMEs in Mongolia Pending IDA / 58790 competitiveness Post Consultant Open 15,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2021-11-30 for participating international Implementation enhancement. Selection trade fairs, exhibition, expos, trade shows CS-4-46/21 / Legal Individual Component 3: Project Under Consultant (Second IDA / 58790 Post Consultant Open 18,000.00 0.00 2021-06-20 2021-06-21 2021-08-08 2021-08-29 2021-10-03 2022-10-03 Implementation Support Implementation recruitment) Selection Page 10 Plan de Passation des Marchés Projet de Promotion de la Compétitivité de la Chaîne des Valeurs de l’Anacarde (PPCA) FINANCEMENT SUR LE PPF I. Généralités 1. Information sur le projet: Pays : Côte d’Ivoire Emprunteur : Conseil Coton-Anacarde (CCA) Nom du Projet : Projet de Promotion de la Compétitivité de la Chaîne des Valeurs de l’Anacarde (PPCA Numéro du Crédit : Unité de Gestion du Projet : Le risque lié au projet : modéré (d’après les seuils proposés. Ce risque sera confirmé après évaluation des capacités en PM de l’unité de gestion du projet) II. Fournitures, Travaux et Services Assimilés 2.1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la Banque Nouveaux seuils de revue de la Banque élaborés en décembre 2012 et proposés au Gouvernement le 05 décembre 2012, révisés en juillet 2016 et liés au niveau de risque du projet. Nature des Méthode de Valeur seuil Contrats soumis à dépenses passation de du marché examen préalable marchés $EU de l’IDA 1. Travaux AOI ≥ 10,000,000 (y compris clés AON < 10,000,000 Tous les contrats de en main, Demande de cotation – < 200,000 15.000.000 $EU et Fourniture et au moins 3 offres plus montage Entente Directe (*) d’installations et Pas de seuil PPP) 2. Fournitures, AOI ≥ 1,000,000 Systèmes AON < 1,000,000 d’Informations Consultation de Tous les contrats de et Services Fournisseurs - Au moins < 100,000 4.000.000 $EU et plus autres que les 3 offres services de Consultation de < 500 000 Consultants Fournisseurs - Au moins 1 3 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil (*) Le justificatif de toute entente directe doit être transmis avec le PPM 3. Procédures applicables aux Composantes relatives au Développement Conduit par les Communautés : N/A 4. Référence (si nécessaire) au Manuel opérationnel/de passation de marchés : 5. Autres arrangements spécifiques pour la passation de marchés : [y inclus passation anticipée de marchés et financement rétroactif, si applicables] Citer le paragraphe inscrit dans l’Accord de Financement le cas échéant) 6. Marchés et Planning et Méthode de Passation : 2 1 2 3 4 5 6 7 8 9 Méth Examen Monta ode préalable Date nt de Pré- Préféren de la prévue Estima Ref. Contract passa qualificati ce Banque pour tif Commentaires No. (Description) tion on nationale (a l’ouvert (en de (oui/non) (oui/non) priori/a ure des milliers march posterior offres $EU) és i) Acquisition de matériels informatiques (ordinateur portable, desktop, disque dur externe, imprimante, serveurs et onduleur) et A 31 Août F/01 matériels bureautiques 99 Non Non posteriori 2018 (photocopieuses, CFN scanneurs, téléphones fixes et mobiles, fax)- DOCKIN STATION pour l’UGP Acquisition de 20 motos pour renforcer le A 29 Août F/02 34 CFN Non Non dispositif de collecte posteriori 2018 des données Acquisition de véhicules pour l’UGP (3), la A 28 Août F/03 CFN Non Non DOPA(1) l’ARRE (1) et le 351 posteriori 2018 CCA(1 ) S/TOTAL FOURNITURE 484 Montant total prévisionnel : 484 $US 3 3. Marchés de Services Assimilés 1 2 3 4 5 6 7 8 9 Examen Montan Pré- Préféren préalable Date t Méthode Ref quali ce de la prévue Estimat de . Contract ficati national Banque pour Commentaires if passation No. (Description) on e (a l’ouvertur (en de (oui/ (oui/non priori/a e des milliers marchés non) ) posteriori offres $EU) ) Veuillez fournir le Contrat de Entente justificatif de location des directe A l’entente directe S/1 locaux de 53 Non Non Mai 2018 Avec SCI Posteriori comme demandé l'UGP pour 7 JAFI dé par la Banque mois Assurance des 5 CFN A 16 Août S/2 véhicules et 34 Non Non posteriori 2018 des 20 motos Fourniture de carburant CFN A 16 Août S/3 pour les 13 Non Non posteriori 2018 activités (5) véhicules TOTAL 100 MARCHES DE 4 SERVICES ASSIMILES Montant total prévisionnel : 100 $US 5 III. Sélection de Consultants 3.1. Seuil d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux Nouveaux seuils de revue de la Banque élaborés en décembre 2012 et proposés au Gouvernement le 05 décembre 2012, révisés en juillet 2016 et liés au niveau de risque du projet. : Nature de Méthode de passation Valeur Contrats soumis à dépenses de marchés seuil du examen préalable contrat $EU Consultan SFQC1, SFQ2, SMC3, ≥ 300.000 ts SCBD4, Tout contrat de 2.000.000 Firmes SFQC, SFQ, SMC, SCBD, < 300.000 $EU ou plus QC5 Pas de Entente directe (*) seuil Consultan Consultant individuel (AMI) ≥ 100.000 ts Consultant individuel (3 Tout contrat de 400.000 $ Individuel < 100.000 CV) EU ou plus s Pas de Entente directe (*) seuil Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. (*) Le justificatif de toute sélection par entente directe doit être transmis avec le PPM 2. Liste restreinte composée entièrement de Consultants Nationaux : La liste restreinte de Consultants pour les services, d'un coût estimatif inférieur à 300 0000 $ US ou équivalent par contrat, peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 7.25 du Règlement de Passation de Marchés dans le Cadre du Financement de Projets d’Investissement (FPI) pour Fournitures, Travaux, Services Autres que des Services de Consultants et Services de Consultants – Juillet 2016. 1 SFQC : Sélection Fondée sur la Qualité et le Coût 2 SFQ : Sélection fondée sur la qualité 3 SMC : Sélection au moindre coût 4 SCBD : Sélection dans le cadre d’un budget déterminé 5 QC : Sélection basée sur les Qualifications des Consultants CI : Consultant Individuel : AMI : Avis à Manifestation d’Intérêt 6 3. Autres arrangements spécifiques pour la sélection : [y compris passation anticipée de marchés et financement rétroactif, si applicables] 7 4. Contrats de Consultants avec Méthode de Sélection et Planning 1 2 3 4 5 6 7 Examen Ref Montant Méthod Date prévue préalable de . Description du contrat estimatif e de pour la la Banque Commentaires No. (en sélectio soumission des (a priori / a milliers n propositions posteriori) $EU) Sélection du C/1 cabinet en cours Recrutement d’un consultant pour la L ANO de la réalisation des études Banque sur les environnementale et sociale 250 QC A posteriori 17 Avril 2018 TDR a été stratégique (EESS) de la zone agro obtenu/ Ce industrielle de KORHOGO marché figurait dans la version initiale du PPM Sélection du C/2 cabinet en cours Recrutement d’un consultant pour la L ANO de la réalisation de l’étude Banque sur les environnementale et sociale 250 QC A postériori 05 Juin 2018 TDR a été stratégique (EESS) de la zone agro obtenu/ Ce industrielle BOUAKE marché figurait dans la version initiale du PPM Sélection du Recrutement d’un consultant pour la C/3 cabinet en cours réalisation de études environnementale et sociale 250 QC A postériori 07 Mai 2018 L ANO de la stratégique (EESS) de la zone agro Banque sur les industrielle de BONDOUKOU TDR a été 8 1 2 3 4 5 6 7 Examen Ref Montant Méthod Date prévue préalable de . Description du contrat estimatif e de pour la la Banque Commentaires No. (en sélectio soumission des (a priori / a milliers n propositions posteriori) $EU) obtenu/ Ce marché figurait dans la version initiale du PPM Sélection du C/4 cabinet en cours Recrutement de consultants pour la L ANO de la réalisation de l’ études Banque sur les environnementale et sociale 250 QC A postériori 07 Avril 2018 TDR a été stratégique (EESS) de la zone agro obtenu/ Ce industrielle de SEGUELA marché figurait dans la version initiale du PPM C/ Recrutement d’un consultant 5 individuel pour le constat d’impact environnemental et social ( CIES) de AMI en cours 100 CI A Postériori 1er Juin 2018 travaux de 184 km de routes rurales dans les régions du GBEKE, HAMBOL et GONTOUGOU C/6 Recrutement d’un consultant AMI en cours individuel pour l’étude d’impact 50 CI A Postériori 1er Juin 2018 environnemental et social (EIES) de 18 km dans les régions du HAMBOL Selon le nouveau Recrutement d’un consultant pour cadre de passation l’actualisation de la structure des prix C/7 50 QC A Posteriori 11 Juin 2018 des marchés de la de la commercialisation de la noix Banque Mondiale, brute de cajou en Côte d’Ivoire en sa section VII, le 9 1 2 3 4 5 6 7 Examen Ref Montant Méthod Date prévue préalable de . Description du contrat estimatif e de pour la la Banque Commentaires No. (en sélectio soumission des (a priori / a milliers n propositions posteriori) $EU) point 7.11, la publication d’ un avis à manifestations d’intérêt n’est pas obligatoire C/8 ED avec 31 Juillet 2018 Justificatif en Recrutement d’un coordonnateur M 21 A priori annexe adjoint chargé de l’industrie KARIM Contrat pour 3 BERTHE mois TOTAL/CONSULTANT 1221 Montant prévisionnel des consultants : 1221 $US TOTAL PREVISIONNEL GENERAL : 1 805 000 $US 10 PROCUREMENT Cote d'Ivoire : Cashew Value Chain Competitiveness Project PLAN General Information Country: Cote d'Ivoire Bank’s Approval Date of the Original Procurement Plan: 2018-08- 13 2021-05- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158810 GPN Date: 18 Project Name: Cashew Value Chain Competitiveness Project Loan / Credit No: IBRD / 88450, IDA / V0300 Interprofessional Fund for Agricultural Research and Advisory Executing Agency(ies): WORKS Activity Reference No. Procurement Estimate Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificatio High SEA/SH Process Prequalification Bidding Documents Contract / Description Component Review Type Method Document d Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process n (Y/N) Risk Status Evaluation Report as Issued Completion Type Amount (US$) Documents Justification / Invitation Opening / Minutes Recommendation (US$) Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planne d CI-FIRCA-74743-CW-RFQ 1. Institutional Request for Single Stage - One Complete 2018-10- 2018-10- 2018-12- 2018-11- 2019- / Travaux d'aménagement IBRD / 88450 strengthening and value Post Limited 20,000.00 50,739.77 Quotations Envelope d 16 08 11 14 06-09 des locaux de la DOPA chain governance CI-FIRCA-74746-CW-RFQ 1. Institutional / Travaux d'aménagement Request for Single Stage - One Complete 2018-11- 2018-11- 2019-01- 2019-01- 2019- IBRD / 88450 strengthening and value Post Limited 42,000.00 72,846.99 du Bâtiment à usage de Quotations Envelope d 19 21 14 08 07-13 chain governance local technique de l'ARRE CI-FIRCA-82585-CW-RFQ 4. Program coordination, Request for Single Stage - One Complete 2018-10- 2018-11- 2018-12- 2018-12- 2019- / Travaux d'aménagement IBRD / 88450 monitoring and knowledge Post Limited 40,000.00 36,736.19 Quotations Envelope d 29 27 24 21 06-22 de l'UCP PPCA management CI-FIRCA-74728-CW-RFB / Sélection d'une entreprise 3. Support to private pour la construction de la investment in post-harvest Open - Single Stage - One 14,335,00 2019-01- 2019-06- 2019-02- 2019-06- 2019-03- 2019-08- 2019-04- 2019-05- 2019- IBRD / 88450 Post Request for Bids 0.00 Canceled plateforme industrielle de and processing International Envelope 0.00 28 14 02 19 16 02 15 20 11-16 Korhogo dédiée à la infrastructure transformation de l'anacarde CI-FIRCA-106689-CW-RFQ 2. Productivity / Aménagement d'un enhancement and Request for Single Stage - One 117,174.3 2019-05- 2019-12- 2019-06- 2020-02- 2019- IBRD / 88450 Post Limited 56,000.00 Signed bâtiment pour abriter le improved access to Quotations Envelope 4 05 23 30 21 12-27 laboratoire de pédologie markets CI-FIRCA-106693-CW-RFB 2. Productivity / Travaux de réhabilitation Pending enhancement and Single Stage - One 3,445,000. 2019-03- 2019-03- 2019-05- 2019-06- 2019-07- 2020- par RC et RLTPC d'environ IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen improved access to Envelope 00 18 23 04 03 08 01-04 146,04 km de routes tation markets rurales (Régions du GBEKE et du HAMBOL) CI-FIRCA-106694-CW-RFB 2. Productivity / Travaux de réhabilitation Pending enhancement and Single Stage - One 2,793,000. 2019-03- 2019-03- 2019-05- 2019-06- 2019-07- 2020- par RC et RLTPC d'environ IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen improved access to Envelope 00 18 23 04 03 08 01-04 116,90 km de routes tation markets rurales (Région du GONTOUGO) CI-FIRCA-106697-CW-RFB 2. Productivity Pending / Travaux de réhabilitation enhancement and Single Stage - One 6,517,000. 2019-09- 2019-09- 2019-10- 2019-11- 2019-12- 2020- IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen par RC et RLTPC d'environ improved access to Envelope 00 01 06 18 17 22 06-19 tation 448 km de routes rurales markets CI-FIRCA-106699-CW-RFQ / Sélection d'un 3. Support to private entrepreneur pour les investment in post-harvest Request for Single Stage - One 121,000.0 107,711.3 2019-03- 2019-03- 2019-05- 2019-04- 2019- Travaux d'aménagement IBRD / 88450 Post Limited Signed and processing Quotations Envelope 0 0 23 19 18 24 11-14 des locaux de l'UCP-PPCA infrastructure (courant fort, courant faible et d'enseigne lumineuse des locaux du PPCA CI-FIRCA-126713-CW-RFB 2. Productivity Pending / Faire réaliser le forage + enhancement and Single Stage - One 200,000.0 2019-09- 2019-09- 2019-10- 2019-11- 2019-12- 2020- IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen équipements pour improved access to Envelope 0 10 15 27 26 31 06-28 tation l'adduction d'eau des 3 CDC markets priorisés CI-FIRCA-82341-CW-RFQ 4. Program coordination, Request for Single Stage - One 2018-12- 2019-02- 2019- / Aménagement de la salle IBRD / 88450 monitoring and knowledge Post Limited 33,000.00 0.00 Canceled Quotations Envelope 22 16 08-15 de réunion de l'annexe 2 du management CCA CI-FIRCA-126705-CW-RFQ 1. Institutional Request for Single Stage - One 2019-09- 2019-11- 2020- / Travaux de Réhabilitation IBRD / 88450 strengthening and value Post Limited 60,000.00 0.00 Canceled Quotations Envelope 25 20 05-18 des bureaux de l’ANDE du chain governance PORO CI-FIRCA-74724-CW-RFB / 3. Support to private Recrutement d'un entreprise investment in post-harvest Open - Single Stage - One 8,600,000. 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2020- pour la construction de la IBRD / 88450 Post Request for Bids 0.00 Canceled and processing International Envelope 00 29 04 15 15 19 02-15 plate forme agro infrastructure industrielle de Bouaké CI-FIRCA-82345-CW-RFB / Travaux de réhabilitation 2. Productivity par RC et RLTPC du second enhancement and Single Stage - One 6,550,000. 2019-04- 2019-04- 2019-05- 2019-06- 2019-07- 2020- IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled programme de 250 km de improved access to Envelope 00 01 06 18 17 22 01-18 routes rurales (10 Lots de markets travaux CI-FIRCA-82340-CW-RFB / 3. Support to private Sélection de cabinets pour investment in post-harvest Single Stage - One 132,000.0 2018-12- 2018-12- 2019-02- 2019-03- 2019-04- 2019- le contrôle des travaux de IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled and processing Envelope 0 20 25 05 07 11 10-08 construction des centres de infrastructure services de la plateforme CI-FIRCA-82339-CW-RFB / Travaux d'Aménagement et de construction des 3. Support to private infrastructures de base des investment in post-harvest Single Stage - One 1,800,000. 2019-06- 2019-06- 2019-07- 2019-08- 2019-09- 2020- IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled 6 Centres de and processing Envelope 00 03 08 20 19 23 03-21 Développement du Cajou infrastructure (bâtiments, locaux techniques, clôtures, parcs météos...) CI-FIRCA-74739-CW-RFB / 2. Productivity Travaux de réhabilitation enhancement and Single Stage - One 6,700,000. 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019- par RC et RLTPC d'environ IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled improved access to Envelope 00 07 12 23 25 29 10-26 258 km de routes rurales markets (10 Lots de travaux) CI-FIRCA-82344-CW-RFB / Travaux de réhabilitation par RLTPC d'environ 170 km de routes rurales (06 Lots 2. Productivity de travaux) enhancement and Single Stage - One 3,800,000. 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019- IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled Travaux de réhabilitation improved access to Envelope 00 30 04 16 15 19 08-18 par RC et RLTPC du second markets programme de 250 km de routes rurales (10 Lots de travaux) CI-FIRCA-74732-CW-RFB / 1. Institutional Pending Single Stage - One 1,500,000. 2020-07- 2020-07- 2020-09- 2020-10- 2020-11- 2021- Construction des bâtiments IBRD / 88450 strengthening and value Post Request for Bids Open - National 0.00 Implemen Envelope 00 20 25 05 05 09 05-08 pour l'extension du CITA chain governance tation CI-FIRCA-126708-CW-RFQ 1. Institutional Pending Request for Single Stage - One 2020-05- 2020-07- 2021- / Travaux d’aménagement IBRD / 88450 strengthening and value Post Limited 27,000.00 0.00 Implemen Quotations Envelope 25 20 01-16 des locaux du PPCA chain governance tation CI-FIRCA-106920-CW-RFQ / Travaux d'aménagement 1. Institutional Pending Request for Single Stage - One 112,000.0 2020-04- 2020-06- 2020- des locaux des 4 DR du CCA IBRD / 88450 strengthening and value Post Limited 0.00 Implemen Quotations Envelope 0 06 01 11-28 Bondoukou, Bouaké, chain governance tation Korhogo et Séguéla CI-FIRCA-126718-CW-RFQ / installer le système 2. Productivity Pending d'électrification solaire enhancement and Request for Single Stage - One 100,000.0 2020-08- 2020-10- 2021- IBRD / 88450 Post Limited 0.00 Implemen (équipements +installation) improved access to Quotations Envelope 0 15 10 04-08 tation d'opérationnalisation des 3 markets CDC priorisés CI-FIRCA-158141-CW-RFQ 2. Productivity Pending Request for Single Stage - One 2020-05- 2020-07- 2021- / Travaux de réhabilitation IBRD / 88450 enhancement and Post Limited 75,000.00 0.00 Implemen Quotations Envelope 23 18 01-14 du batiment existant improved access to tation markets CI-FIRCA-74729-CW-RFB / Sélection d'une entreprise 3. Support to private pour la construction de la investment in post-harvest Open - Single Stage - One 8,600,000. 16,857,19 2020-03- 2020-05- 2020-03- 2020-05- 2020-07- 2020-06- 2020-07- 2020-07- 2020-10- 2021- IBRD / 88450 Post Request for Bids Signed plateforme industrielle de and processing International Envelope 00 0.84 16 18 21 02 14 01 28 06 12 01-02 Bondoukou dédiée à la infrastructure transformation de l'anacarde CI-FIRCA-140336-CW-RFB 3. Support to private / Sélection d’un Under investment in post-harvest Open - Single Stage - One 15,000,00 2020-03- 2020-06- 2020-03- 2020-08- 2020-04- 2020-08- 2020-05- 2020-10- 2020-06- 2020- entrepreneur pour les IBRD / 88450 Prior Request for Bids 0.00 Implemen and processing International Envelope 0.00 06 08 11 04 22 25 22 26 26 12-23 travaux de construction de tation infrastructure la plateforme de Korhogo CI-FIRCA-126720-CW-RFB 2. Productivity / Acquérir un forage + enhancement and Single Stage - One 150,000.0 2019-09- 2019-09- 2019-10- 2019-11- 2019-12- 2020- IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled équipements pour improved access to Envelope 0 02 07 19 18 23 06-20 l'adduction d'eau des 3 CDC markets priorisés CI-FIRCA-82346-CW-RFB / Travaux d'entretien par 2. Productivity RLEP du 1er programme de enhancement and Single Stage - One 428,000.0 2019-12- 2019-12- 2020-01- 2020-02- 2020-03- 2020- IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled 428 (258+170) km de improved access to Envelope 0 02 07 18 17 23 09-19 routes rurales réhabilités markets (05 Lots de travaux) CI-FIRCA-179998-CW-RFQ 4. Program coordination, / TRAVAUX Request for Single Stage - One 2020-06- 2020-06- 2020-08- 2020-08- 2021- IBRD / 88450 monitoring and knowledge Post Limited 46,000.00 47,705.10 Signed SUPPLEMENTAIRES Quotations Envelope 21 12 16 10 02-12 management D'AMENAGEMENT DES LOCAUX DU PPCA EN 3 LOTS CI-FIRCA-157378-CW-RFQ 2. Productivity Request for Single Stage - Two 112,000.0 2020-04- 2020-07- 2020-07- 2020-09- 2020-12- 2022- / Travaux d’aménagement IBRD / 88450 enhancement and Post Limited 0.00 Canceled Proposals Envelope 0 15 01 01 09 27 06-20 des sites des 3 CDC improved access to markets CI-FIRCA-201791-CW-RFB / Travaux de réhabilitation 2. Productivity Pending par RC et RLTPC du second enhancement and Single Stage - One 7,200,000. 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021- IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen programme de 250 km de improved access to Envelope 00 02 07 19 18 22 08-21 tation routes rurales ( 16 Lots de markets travaux) CI-FIRCA-201799-CW-RFB / Travaux d’entretien par 2. Productivity Pending RLEP de 465 Km routes enhancement and Single Stage - One 435,000.0 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021- IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen rurales dans les Régions du improved access to Envelope 0 17 24 05 04 11 09-07 tation Gbèkè, du Hambol et du markets Gontougo (10 Lots) CI-FIRCA-201802-CW-RFQ / Travaux de réhabilitation 2. Productivity Pending du bâtiment existant à enhancement and Request for Single Stage - One 112,000.0 2020-11- 2021-01- 2021- IBRD / 88450 Post Limited 0.00 Implemen usage d'hébergement du improved access to Quotations Envelope 0 21 16 07-15 tation site du Laboratoire markets Agropédologique de Sinématiali CI-FIRCA-157696-CW-RFB / Travaux de réhabilitation 1. Institutional Pending Single Stage - One 280,000.0 2020-12- 2020-12- 2021-01- 2021-03- 2021-04- 2021- et d'extension des IBRD / 88450 strengthening and value Post Request for Bids Open - National 0.00 Implemen Envelope 0 15 20 31 02 06 10-03 batiments des délégations chain governance tation régionales du CCA (Bondoukou) CI-FIRCA-157707-CW-RFB / Travaux de réhabilitation 1. Institutional Pending Single Stage - One 280,000.0 2020-07- 2020-07- 2020-08- 2020-09- 2020-11- 2021- et d'extension des IBRD / 88450 strengthening and value Post Request for Bids Open - National 0.00 Implemen Envelope 0 13 18 29 28 02 05-01 batiments des délégations chain governance tation régionales du CCA (Bouaké) CI-FIRCA-157713-CW-RFQ / Travaux de réhabilitation 1. Institutional Pending Request for Single Stage - One 233,000.0 2020-12- 2021-02- 2021- et d'extension des IBRD / 88450 strengthening and value Post Limited 0.00 Implemen Quotations Envelope 0 20 14 08-13 batiments des délégations chain governance tation régionales du CCA (Korhogo) CI-FIRCA-157722-CW-RFB / Travaux de réhabilitation 1. Institutional Pending Single Stage - One 280,000.0 2020-12- 2020-12- 2021-01- 2021-03- 2021-04- 2021- et d'extension des IBRD / 88450 strengthening and value Post Request for Bids Open - National 0.00 Implemen Envelope 0 15 20 31 02 06 10-03 batiments des délégations chain governance tation régionales du CCA (Séguéla) CI-FIRCA-157691-CW-RFQ 1. Institutional / Travaux d'aménagement Request for Single Stage - One 186,000.0 2020-04- 2020-06- 2020- IBRD / 88450 strengthening and value Post Limited 0.00 Canceled des locaux du laboratoire Quotations Envelope 0 20 15 12-12 chain governance central du CITA CI-FIRCA-106687-CW-RFQ 1. Institutional Request for Single Stage - One 2020-11- 2021-01- 2021- / Travaux de Réhabilitation IBRD / 88450 strengthening and value Post Limited 60,000.00 0.00 Canceled Quotations Envelope 16 11 07-10 des bureaux de l' ANDE du chain governance PORO CI-FIRCA-191631-CW-RFQ 2. Productivity Request for Single Stage - One 112,000.0 2020-11- 2021-01- 2021- / Travaux d’aménagement IBRD / 88450 enhancement and Post Limited 0.00 Canceled Quotations Envelope 0 21 16 07-15 des sites des 3 CDC improved access to markets CI-FIRCA-157377-CW-RFQ 2. Productivity / Travaux de construction enhancement and Request for Single Stage - One 168,000.0 2020-11- 2021-01- 2021- IBRD / 88450 Post Limited 0.00 Canceled des infrastructures de base improved access to Quotations Envelope 0 22 17 07-16 des 3 CDC markets CI-FIRCA-126711-CW-RFQ / Réalisation de travaux 2. Productivity agricoles enhancement and Request for Single Stage - One 100,000.0 2020-09- 2020-10- 2021- d'opérationnalisation des 3 IBRD / 88450 Post Limited 0.00 Canceled improved access to Quotations Envelope 0 05 31 04-29 CDC priorisés pour la mise markets en place des essais de recherche agronomique 2019 CI-FIRCA-157564-CW-RFB / Travaux de construction 3. Support to private du centre de vie, du poste investment in post-harvest Single Stage - One 4,413,000. 2020-10- 2020-10- 2020-11- 2020-12- 2021-01- 2021- IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled de police, bureaux and processing Envelope 00 01 06 17 17 21 07-20 administratifs et du centre infrastructure de secours (GSPM) de ZAI de Korhogo CI-FIRCA-157380-CW-RFB 2. Productivity / Travaux de réhabilitation enhancement and Single Stage - One 4,640,000. 2020-05- 2020-05- 2020-07- 2020-08- 2020-09- 2021- par RC et RLTPC d’environ IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled improved access to Envelope 00 24 29 10 09 13 03-12 159,4 km de routes rurales markets (Régions du GBEKE et du HAMBOL) CI-FIRCA-157382-CW-RFB 2. Productivity / Travaux de réhabilitation enhancement and Single Stage - One 3,160,000. 2020-05- 2020-05- 2020-07- 2020-08- 2020-09- 2021- par RC et RLTPC d’environ IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled improved access to Envelope 00 25 30 11 10 14 03-13 94,2 km de routes rurales markets (Région du GONTOUGO) CI-FIRCA-74738-CW-RFB / 3. Support to private Sélection d'entreprises pour investment in post-harvest Single Stage - One 1,300,000. 2020-09- 2020-09- 2020-11- 2020-12- 2021-01- 2021- la réalisation des travaux de IBRD / 88450 Post Request for Bids Open - National 0.00 Canceled and processing Envelope 00 21 26 07 07 11 07-10 construction des centres de infrastructure services de la plateforme CI-FIRCA-74731-CW-RFB / Sélection d'une entreprise 3. Support to private pour la construction de la investment in post-harvest Open - Single Stage - One 8,600,000. 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2021- IBRD / 88450 Post Request for Bids 0.00 Canceled plateforme industrielle de and processing International Envelope 00 30 04 16 15 20 01-16 SEGUELA dédiée à la infrastructure transformation de l'anacarde CI-FIRCA-106676-CW-RFB 1. Institutional Pending Single Stage - One 372,000.0 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- 2021- / Travaux d'aménagement IBRD / 88450 strengthening and value Post Request for Bids Open - National 0.00 Implemen Envelope 0 10 15 27 26 02 08-29 des locaux du CCA au chain governance tation Vallon CI-PPCA-225082-CW-RFB / Travaux de construction 3. Support to private Pending du centre de vie, du poste investment in post-harvest Single Stage - One 3,352,000. 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022- IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen de police, bureaux and processing Envelope 00 30 05 16 16 20 07-19 tation administratifs et du centre infrastructure de secours (GSPM) de ZAI de Korhogo CI-PPCA-225086-CW-RFB / Travaux de construction 3. Support to private Pending du centre de vie, du poste investment in post-harvest Single Stage - One 2,235,000. 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022- IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen de police, bureaux and processing Envelope 00 30 05 16 16 20 07-19 tation administratifs et du centre infrastructure de secours (GSPM) de ZAI de Bondoukou Page 1 CI-PPCA-225088-CW-RFQ 3. Support to private Pending / Travaux d’aménagement investment in post-harvest Request for Single Stage - One 186,000.0 2021-09- 2021-10- 2022- IBRD / 88450 Post Limited 0.00 Implemen des locaux du laboratoire and processing Quotations Envelope 0 05 31 04-29 tation central du CITA infrastructure CI-PPCA-225094-CW-RFB 3. Support to private / Travaux d’aménagement Pending investment in post-harvest Single Stage - One 372,000.0 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022- des sites des unités de IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen and processing Envelope 0 30 04 15 15 19 05-18 décorticage (Construction tation infrastructure de bâtiments divers) CI-PPCA-225095-CW-RFQ 3. Support to private / Travaux d’aménagement Pending investment in post-harvest Request for Single Stage - One 150,000.0 2021-08- 2021-10- 2022- d’un atelier agro- IBRD / 88450 Post Limited 0.00 Implemen and processing Quotations Envelope 0 29 24 04-22 alimentaire d’incubation tation infrastructure pour les produits dérives de l’amande de cajou CI-PPCA-225589-CW-RFB 2. Productivity Pending / Travaux d'aménagement enhancement and Single Stage - One 3,725,000. 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022- IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen des infrastructures de base improved access to Envelope 00 31 05 17 16 20 03-19 tation des 3 CDC (forages, clôture markets etc.) CI-PPCA-225598-CW-RFB / Travaux de réhabilitation 2. Productivity Pending par RC et RLTPC d’environ enhancement and Single Stage - One 5,400,000. 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022- IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen 261,3 km de routes rurales improved access to Envelope 00 31 05 17 16 21 06-19 tation (Régions du GBEKE, du markets HAMBOL et du GONTOUGO) CI-PPCA-225621-CW-RFB 2. Productivity / Travaux d'entretien par Pending enhancement and Single Stage - One 435,000.0 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022- RLEP d’environ 465 km de IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen improved access to Envelope 0 31 05 17 16 21 06-19 routes rurales (Régions du tation markets GBEKE, du HAMBOL et du GONTOUGO) CI-PPCA-225624-CW-RFB 2. Productivity / Travaux de réhabilitation Pending enhancement and Single Stage - One 1,117,000. 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022- par RC et RLTPC d’environ IBRD / 88450 Post Request for Bids Open - National 0.00 Implemen improved access to Envelope 00 31 05 17 16 21 06-19 200 km de routes rurales de tation markets la Région du Béré CI-PPCA-225626-CW-RFQ / Réalisation de travaux 2. Productivity agricoles Pending enhancement and Request for Single Stage - One 100,000.0 2021-07- 2021-08- 2022- d'opérationnalisation des 3 IBRD / 88450 Post Limited 0.00 Implemen improved access to Quotations Envelope 0 01 26 02-22 CDC priorisés pour la mise tation markets en place des essais de recherche agronomique 2021 GOODS Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificatio Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process n (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual CI-FIRCA-67982-GO-RFQ 4. Program coordination, / Acquisition de 20 motos Request for Single Stage - One 2018-09- 2018-07- 2018-10- 2018-09- 2019-04- 2018-10- IBRD / 88450 monitoring and knowledge Post Limited 34.00 26,617.94 Completed pour renforcer le dispositif Quotations Envelope 03 27 29 27 27 27 management de collecte des données CI-FIRCA-74132-GO-RFB / 1. Institutional FOURNITURES DE SACS AUX Single Stage - One 2018-10- 2019-01- 2018-10- 2018-12- 2019-02- 2019-01- 2019-02- 2019-02- 2019-04- 2019-08- 2019-06- IBRD / 88450 strengthening and value Post Request for Bids Open - National 975,000.00 790,751.50 Completed PRODUCTEURS DES NOIX DE Envelope 18 04 23 04 15 03 22 07 24 14 07 chain governance CAJOU CI-FIRCA-68046-GO-RFB / Acquisition de véhicules 4. Program coordination, Single Stage - One 2018-07- 2018-08- 2018-09- 2018-10- 2018-11- 2019-05- pour l'UGP (3), la DOPA(1) IBRD / 88450 monitoring and knowledge Post Request for Bids Open - National 351.00 0.00 Canceled Envelope 31 05 16 16 20 19 l'ARRE (1) et le management CCA(1 ) CI-FIRCA-74620-GO-RFQ 4. Program coordination, Request for Single Stage - One 2018-09- 2018-08- 2018-10- 2018-11- 2019-04- 2018-12- / Acquisitions de véhicules IBRD / 88450 monitoring and knowledge Post Limited 499,000.00 526,591.31 Completed Quotations Envelope 01 31 27 02 25 15 pour l' UCP management CI-FIRCA-74630-GO-RFQ / Acquisition de matériel informatique (ordinateur 4. Program coordination, Request for Single Stage - One 2018-10- 2018-12- 2019-06- portable, desktop, disque IBRD / 88450 monitoring and knowledge Post Limited 99,000.00 0.00 Canceled Quotations Envelope 09 04 02 dur externe, imprimante, management serveurs et onduleur) pour l'UCP et le CCA CI-FIRCA-74643-GO-RFQ 4. Program coordination, / Acquisition de mobiliers Request for Single Stage - One 2018-10- 2018-11- 2018-12- 2019-01- 2019-06- 2019-02- IBRD / 88450 monitoring and knowledge Post Limited 99,000.00 19,353.34 Completed de bureau pour le CCA et Quotations Envelope 09 27 04 08 02 10 management la DOPA CI-FIRCA-74713-GO-RFB / Acquisition des équipements informatiques 1. Institutional Single Stage - One 2019-10- 2018-01- 2019-10- 2019-12- 2019-02- 2020-01- 2019-03- 2020-02- 2019-05- 2020-08- pour (i) la Plateforme IBRD / 88450 strengthening and value Post Request for Bids Open - National 320,000.00 415,851.84 Signed Envelope 22 15 27 08 19 07 06 11 14 09 électronique du Registre chain governance central de l'ARRE, (ii) des 10 entrepôts SRE et (iii) le local technique CI-FIRCA-74715-GO-RFQ / Acquisition du matériel et 1. Institutional Request for Single Stage - One 2018-09- 2018-09- 2018-10- 2018-11- 2019-04- 2018-11- mobilier de bureau pour le IBRD / 88450 strengthening and value Post Limited 50,000.00 32,166.47 Completed Quotations Envelope 04 05 30 13 28 27 local technique chain governance (15 bureaux complets) ARRE CI-FIRCA-82269-GO-RFQ 2. Productivity / Acquérir des prototypes Pending enhancement and Request for Single Stage - One 2018-11- 2018-12- 2019-06- d'outils mécaniques à IBRD / 88450 Post Limited 60,000.00 0.00 Implement improved access to Quotations Envelope 03 29 27 adapter au ramassage de la ation markets récolte en cajou culture CI-FIRCA-82285-GO-RFQ / Acquisition de matériel informatique (ordinateur portable, desktop, disque 4. Program coordination, Pending Request for Single Stage - One 2018-10- 2018-12- 2019-06- dur externe, imprimante, IBRD / 88450 monitoring and knowledge Post Limited 99,000.00 0.00 Implement Quotations Envelope 23 18 16 serveurs et onduleur) et management ation bureautique (photocopieuses, scanneurs, téléphones fixes et mobiles, fax) pour l'UCP et le CCA CI-FIRCA-82289-GO-RFQ 2. Productivity Request for Single Stage - One 2018-11- 2019-01- 2019-07- / Acquisition d'un véhicule IBRD / 88450 enhancement and Post Limited 64,000.00 0.00 Canceled Quotations Envelope 07 02 01 de type 4x4 pour improved access to l'AGEROUTE markets CI-FIRCA-82291-GO-RFQ / Acquisition de matériel 2. Productivity informatique et bureautique enhancement and Request for Single Stage - One 2018-12- 2019-01- 2019-07- (ordinateurs, imprimantes, IBRD / 88450 Post Limited 19,000.00 0.00 Canceled improved access to Quotations Envelope 05 30 29 etc.), de consommables markets informatiques pour l'année 1 et 2 CI-FIRCA-82292-GO-RFQ / Acquisition de matériel 2. Productivity informatique et bureautique enhancement and Request for Single Stage - One 2019-04- 2019-05- 2019-11- (ordinateurs, imprimantes, IBRD / 88450 Post Limited 19,000.00 0.00 Canceled improved access to Quotations Envelope 03 29 25 etc.), de consommables markets informatiques pour l'année 1 et 2 CI-FIRCA-82591-GO-RFQ 4. Program coordination, Request for Single Stage - One 2018-10- 2018-09- 2018-12- 2018-11- 2019-06- 2019-04- / Acquisition de mobiliers IBRD / 88450 monitoring and knowledge Post Limited 50,000.00 31,795.01 Completed Quotations Envelope 23 05 18 13 16 02 de bureau management CI-FIRCA-74612-GO-DIR / Acquisition et installation d'équipements 1. Institutional Pending 2018-11- 2018-12- 2019-01- 2019-07- technologiques de IBRD / 88450 strengthening and value Post Direct Selection Direct 850,000.00 0.00 Implement 30 05 09 08 transformation du CITA chain governance ation dans le cadre du partenariat entre le CCA et l'Université de HO CHI MIN CI-FIRCA-76396-GO-RFQ 4. Program coordination, Request for Single Stage - One 2018-12- 2018-12- 2019-01- 2019-02- 2019-07- 2019-04- / Acquisition de carburant IBRD / 88450 monitoring and knowledge Post Limited 100,000.00 91,975.21 Signed Quotations Envelope 05 04 30 20 29 06 pour le projet management CI-FIRCA-82274-GO-DIR / Entente directe avec ICRAF pour la Fourniture et l' 2. Productivity installation de 34 stations enhancement and 2018-11- 2019-01- 2018-12- 2019-01- 2019-01- 2019-02- 2019-07- 2019-05- IBRD / 88450 Post Direct Selection Direct 22,348,000.00 217,424.35 Completed agro-météorologiques improved access to 29 22 04 22 08 20 07 31 additionnelles pour une markets meilleure couverture de la zone du projet CI-FIRCA-97637-GO-DIR / 1. Institutional Fourniture d'imprimés 2019-02- 2019-02- 2019-02- 2019-03- 2019-02- 2019-09- 2019-03- IBRD / 88450 strengthening and value Post Direct Selection Direct 151,000.00 138,128.49 Completed sécurisées de récépissés 08 13 04 20 20 16 20 chain governance d'entreposage pour l'ARRE CI-FIRCA-106486-GO-RFQ 1. Institutional Request for Single Stage - One 2019-04- 2019-05- 2019-06- 2019-07- 2019-11- 2019-07- / Acquisition du Matériel IBRD / 88450 strengthening and value Post Limited 56,000.00 37,306.84 Completed Quotations Envelope 06 03 01 02 28 17 Informatique pour le CCA chain governance CI-FIRCA-106494-GO-RFB / Acquisition de 80 000 1. Institutional cartes destinées aux Single Stage - One 2019-03- 2019-06- 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- 2019-07- 2019-07- 2019-09- 2020-01- IBRD / 88450 strengthening and value Post Request for Bids Open - National 112,000.00 195,631.53 Signed producteurs bénéficiaires Envelope 30 12 04 23 16 11 15 11 20 05 16 chain governance du projet, pour la collecte électronique de données CI-FIRCA-106496-GO-DIR / Entente directe avec SOTIC pour l'acquisition de petits équipements de 1. Institutional 2019-03- 2019-03- 2019-05- 2019-04- 2019-05- 2019-10- 2019-09- transformation pour la mise IBRD / 88450 strengthening and value Post Direct Selection Direct 325,000.00 396,659.00 Completed 18 23 02 27 08 24 04 en œuvre d'un programme chain governance d'accompagnement des sociétés coopératives pour la transformation CI-FIRCA-106497-GO-RFQ / Fourniture d'un photocopieur à grand tirage, de kits composés de 1. Institutional trois vidéoprojecteurs et de Request for Single Stage - One 2019-04- 2019-04- 2019-06- 2019-05- 2019-11- 2019-06- IBRD / 88450 strengthening and value Post Limited 33,000.00 28,753.82 Completed quatre ordinateurs Quotations Envelope 06 10 01 08 28 07 chain governance portables pour la DOPA et dotation la salle des serveurs d'un rack et d'un système de détection anti- humidité CI-FIRCA-106502-GO-DIR / Entente directe avec 1. Institutional l'université HO CHI MIN 2019-03- 2019-03- 2019-05- 2019-05- 2019-05- 2019-10- 2019-08- IBRD / 88450 strengthening and value Post Direct Selection Direct 130,000.00 100,132.25 Completed pour l'acquisition de 130 25 30 02 04 08 31 13 chain governance humidimètres pour les agents du CCA CI-FIRCA-106547-GO-DIR / Entente directe avec ICRAF 2. Productivity pour la fourniture et enhancement and 2019-03- 2019-05- 2019-03- 2019-05- 2019-05- 2019-06- 2019-10- IBRD / 88450 Post Direct Selection Direct 267,000.00 349,059.19 Signed l'installation d' un improved access to 22 20 27 28 01 06 28 laboratoire d'analyse markets pédologique de développement CI-FIRCA-106548-GO-DIR 2. Productivity Under / Entente directe avec le enhancement and 2019-04- 2019-03- 2019-04- 2019-05- 2019-11- IBRD / 88450 Post Direct Selection Direct 56,000.00 0.00 Implement CNRA pour la fourniture de improved access to 10 04 15 20 16 ation greffons aux pépiniéristes markets privés CI-FIRCA-106600-GO-RFB 2. Productivity Single Stage - One 2019-03- 2019-03- 2019-03- 2019-05- 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- 2020-01- 2019-06- / Acquisition de 309 motos IBRD / 88450 enhancement and Post Request for Bids Open - National 999,000.00 793,227.58 Completed Envelope 25 15 30 11 29 10 02 15 03 11 05 pour l'ANADER improved access to markets CI-FIRCA-106662-GO-RFQ 4. Program coordination, Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-11- 2019-05- / Fournitures de bureau IBRD / 88450 monitoring and knowledge Post Limited 60,000.00 36,243.38 Completed Quotations Envelope 05 02 31 17 27 31 pour l'UCP management CI-FIRCA-106672-GO-RFQ 4. Program coordination, / Equipement des locaux Request for Single Stage - One 2019-03- 2019-03- 2019-05- 2019-04- 2019-11- 2019-07- IBRD / 88450 monitoring and knowledge Post Limited 65,000.00 49,985.36 Completed aménagés du PPCA Quotations Envelope 23 14 18 05 14 11 management (mobiliers et matériel de bureau) CI-FIRCA-106890-GO-RFQ 3. Support to private / Edition de supports de investment in post-harvest Request for Single Stage - One 2019-07- 2019-10- 2019-08- 2019-11- 2020-02- 2020-03- communication sur les IBRD / 88450 Post Limited 28,000.00 939.50 Completed and processing Quotations Envelope 06 18 31 14 27 12 mécanismes de financement infrastructure à coûts partagés CI-FIRCA-107947-GO-RFQ 4. Program coordination, Request for Single Stage - One 2019-04- 2019-06- 2019-06- 2019-07- 2019-12- 2019-07- / Fourniture de IBRD / 88450 monitoring and knowledge Post Limited 40,000.00 35,460.81 Completed Quotations Envelope 28 14 23 11 20 22 consommables management informatiques pour l'UCP CI-FIRCA-106538-GO-RFQ 2. Productivity / Acquisition des enhancement and Request for Single Stage - One 2019-04- 2020-04- 2019-05- 2019-05- 2019-11- IBRD / 88450 Post Limited 84,000.00 54,524.74 Signed équipements informatiques improved access to Quotations Envelope 05 17 31 07 27 pour les prestataires du markets PNRA CI-FIRCA-126660-GO-DIR 2. Productivity / Fourniture de greffons Pending enhancement and 2019-08- 2019-08- 2019-09- 2020-03- aux pépiniéristes privés et IBRD / 88450 Post Direct Selection Direct 25,000.00 0.00 Implement improved access to 13 18 22 20 des plants greffés aux ation markets producteurs. CI-FIRCA-126674-GO-DIR 2. Productivity / Fourniture de greffons Pending enhancement and 2019-08- 2019-08- 2019-09- 2020-03- aux pépiniéristes privés et IBRD / 88450 Post Direct Selection Direct 28,000.00 0.00 Implement improved access to 15 20 24 22 des plants greffés aux ation markets producteurs CI-FIRCA-126681-GO-DIR 2. Productivity Pending / Fourniture des plants enhancement and 2019-08- 2019-08- 2019-09- 2020-03- IBRD / 88450 Post Direct Selection Direct 195,000.00 0.00 Implement greffés par les pépiniéristes improved access to 15 20 24 22 ation privés aux producteurs markets CI-FIRCA-126692-GO-RFB / Acquisition et installation 2. Productivity Pending des infrastructures de base enhancement and Single Stage - One 2019-10- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IBRD / 88450 Post Request for Bids Open - National 150,000.00 0.00 Implement (conteneurs aménagés) improved access to Envelope 30 04 16 15 19 17 ation d’opérationnalisation des 3 markets CDC priorisés CI-FIRCA-126695-GO-DIR / Acquisition de 7 véhicules doubles cabines pour le 1. Institutional renforcement de la 2019-08- 2019-10- 2019-08- 2019-10- 2019-09- 2019-10- 2020-03- 2019-12- IBRD / 88450 strengthening and value Post Direct Selection Direct 210,000.00 202,762.83 Completed coordination des activités à 20 03 25 03 29 10 27 04 chain governance mettre en œuvre par le CCA sur le terrain et le programme anacarde du CNRA Korhogo CI-FIRCA-126702-GO-DIR 2. Productivity / Acquisition de matériels enhancement and 2019-08- 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2020-03- 2019-10- de réhabilitation de IBRD / 88450 Post Direct Selection Direct 146,000.00 111,297.31 Completed improved access to 20 20 25 27 29 24 27 18 plantations d’anacarde markets (Tronçonneurs, secateurs….) CI-FIRCA-106534-GO-RFQ 2. Productivity / Acquisition de 2 enhancement and Request for Single Stage - One 2019-03- 2019-05- 2019-11- véhicules pickup up 4 x 4 IBRD / 88450 Post Limited 112,000.00 0.00 Canceled improved access to Quotations Envelope 25 20 16 pour le Programme markets Anacarde du CNRA Korhogo CI-FIRCA-74716-GO-RFQ 1. Institutional Request for Single Stage - One 2018-10- 2018-12- 2019-06- / Fournitures et IBRD / 88450 strengthening and value Post Limited 83,000.00 0.00 Canceled Quotations Envelope 30 25 23 installations de climatiseurs chain governance a l'ARRE CI-FIRCA-82300-GO-RFQ 2. Productivity / Acquisition de divers enhancement and Request for Single Stage - One 2018-11- 2019-01- 2019-07- IBRD / 88450 Post Limited 5,000.00 0.00 Canceled mobiliers de bureau pour improved access to Quotations Envelope 07 02 01 l'AGEROUTE markets CI-FIRCA-74623-GO-RFQ 2. Productivity / Edition des outils enhancement and Request for Single Stage - One 2018-12- 2019-02- 2019-08- IBRD / 88450 Post Limited 40,000.00 0.00 Canceled didactiques du Conseil improved access to Quotations Envelope 15 09 08 Agricole dédié à l'Anacarde markets Page 2 CI-FIRCA-67980-GO-RFQ / Acquisition de matériels informatiques (ordinateur portable, desktop, disque dur externe, imprimante, 4. Program coordination, Request for Single Stage - One 2018-09- 2018-10- 2019-04- serveurs et onduleur) et IBRD / 88450 monitoring and knowledge Post Limited 99,000.00 0.00 Canceled Quotations Envelope 05 31 29 matériels bureautiques management (photocopieuses, scanneurs, téléphones fixes et mobiles, fax)-DOCKIN STATION pour l'UGP CI-FIRCA-82302-GO-RFQ 2. Productivity / Acquisition de carburant enhancement and Request for Single Stage - One 2018-11- 2019-01- 2019-07- IBRD / 88450 Post Limited 41,000.00 0.00 Canceled et lubrifiant pour la durée improved access to Quotations Envelope 07 02 01 du Projet pour l'AGEROUTE markets CI-FIRCA-82287-GO-RFQ 2. Productivity Request for Single Stage - One 2018-12- 2019-01- 2019-07- / Acquisition d'un véhicule IBRD / 88450 enhancement and Post Limited 64,000.00 0.00 Canceled Quotations Envelope 05 30 29 de type 4x4 pour improved access to l'AGEROUTE markets CI-FIRCA-106498-GO-RFQ / Acquisition de 4 véhicules dont 3 doubles cabines 1. Institutional Request for Single Stage - One 2019-03- 2019-05- 2019-11- pour le renforcement de la IBRD / 88450 strengthening and value Post Limited 97,000.00 0.00 Canceled Quotations Envelope 23 18 14 coordination des activités à chain governance mettre en œuvre par le CCA sur le terrain CI-FIRCA-126875-GO-RFQ 1. Institutional / Acquisition et installation Request for Single Stage - One 2019-10- 2019-12- 2020-06- IBRD / 88450 strengthening and value Post Limited 60,000.00 0.00 Canceled de locaux préfabriqués pour Quotations Envelope 15 10 07 chain governance abriter le labo de pédologie CI-FIRCA-74652-GO-RFB / 1. Institutional Acquisitions d'équipements Single Stage - One 2019-04- 2019-04- 2019-05- 2019-06- 2019-07- 2020-01- IBRD / 88450 strengthening and value Post Request for Bids Open - National 150.00 0.00 Canceled d'entrepôt dans le cadre de Envelope 08 13 25 24 29 25 chain governance l'amélioration post récolte CI-FIRCA-74712-GO-RFB / Acquisition d'équipements informatiques pour la 1. Institutional dématérialisation des Single Stage - One 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-08- IBRD / 88450 strengthening and value Post Request for Bids Open - National 500,000.00 0.00 Canceled procédures d'exportation Envelope 30 04 16 15 19 18 chain governance des noix brutes de cajou (plateforme d'Echanges de Données Informatisées CI-FIRCA-74634-GO-RFB / Acquisition d'équipements 2. Productivity audiovisuel pour faciliter la enhancement and Single Stage - One 2019-02- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- IBRD / 88450 Post Request for Bids Open - National 218,000.00 0.00 Canceled sensibilisation des improved access to Envelope 06 11 25 24 29 25 producteurs par les agents markets de vulgarisation et pour l'UCP CI-FIRCA-157483-GO-RFB / Sélection de fournisseurs 2. Productivity pour la fourniture des enhancement and Single Stage - One 2020-03- 2020-06- 2020-03- 2020-05- 2020-06- 2020-05- 2020-06- 2020-07- 2020-07- 2021-01- semences pour la mise en IBRD / 88450 Post Request for Bids Open - National 28,000.00 24,086.32 Signed improved access to Envelope 15 15 20 01 19 31 19 05 06 01 place de tests de cultures markets vivrières en intercalaire dans les parcelles de démonstration des CEP CI-FIRCA-157485-GO-DIR / Sélection par Entente 2. Productivity Pending Directe du CNRA pour la enhancement and 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 88450 Post Direct Selection Direct 20,000.00 0.00 Implement fourniture des greffons aux improved access to 02 07 11 08 ation pépiniéristes pour la markets production des plants greffés CI-FIRCA-157486-GO-DIR / Sélection par Entente Directe de M NIAMKE André 2. Productivity Pending Claude, pépiniériste de enhancement and 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 88450 Post Direct Selection Direct 13,000.00 0.00 Implement Yamoussoukro pour la improved access to 02 07 11 08 ation fourniture des greffons aux markets pépiniéristes pour la production des plants greffés CI-FIRCA-157487-GO-DIR / Sélection par Entente 2. Productivity Directe de M CHERIF Pending enhancement and 2020-03- 2020-03- 2020-04- 2020-10- Mamadou , pépiniériste de IBRD / 88450 Post Direct Selection Direct 17,000.00 0.00 Implement improved access to 02 07 11 08 Séguéla pour la fourniture ation markets des greffons aux pépiniéristes pour la production des plants greffés CI-FIRCA-157497-GO-RFB 2. Productivity / Sélection de fournisseurs enhancement and Single Stage - One 2020-03- 2020-04- 2020-03- 2020-04- 2020-04- 2020-06- 2020-05- 2020-06- 2020-06- 2020-07- 2020-12- 2020-10- d'engrais foliaires IBRD / 88450 Post Request for Bids Open - National 978,000.00 1,021,038.04 Completed improved access to Envelope 02 17 07 22 18 12 18 06 22 03 19 16 organiques pour la markets fertilisation des vergers réhabilités CI-FIRCA-157503-GO-DIR 2. Productivity / Sélection de fournisseurs enhancement and 2020-03- 2020-05- 2020-04- 2020-05- 2020-05- 2020-07- 2020-11- 2020-08- des équipements et IBRD / 88450 Post Direct Selection Direct 131,000.00 121,628.64 Completed improved access to 31 19 05 22 10 03 06 11 matériels techniques des markets OPCA (tronçonneurs) CI-FIRCA-157507-GO-RFB 2. Productivity / Sélection de fournisseurs enhancement and Single Stage - One 2020-02- 2020-04- 2020-03- 2020-04- 2020-04- 2020-06- 2020-05- 2020-06- 2020-06- 2020-07- 2020-12- 2020-11- de produits insecticides IBRD / 88450 Post Request for Bids Open - National 326,000.00 341,972.18 Completed improved access to Envelope 29 17 05 22 16 02 16 06 20 03 17 25 pour la protection des markets vergers réhabilités CI-FIRCA-82266-GO-RFB / 2. Productivity Contractualiser avec les enhancement and Single Stage - One 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-08- IBRD / 88450 Post Request for Bids Open - National 123,000.00 0.00 Canceled pépiniéristes privés pour la improved access to Envelope 29 03 15 14 18 17 production des plants markets greffés CI-FIRCA-82275-GO-RFB / 2. Productivity Acquisition de 130 enhancement and Single Stage - One 2018-12- 2018-12- 2019-02- 2019-03- 2019-04- 2019-10- IBRD / 88450 Post Request for Bids Open - National 130,000.00 0.00 Canceled humidimètres pour les improved access to Envelope 26 31 11 13 17 14 agents du CCA markets CI-FIRCA-106543-GO-RFB 2. Productivity / Acquisition des enhancement and Single Stage - One 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2020-02- IBRD / 88450 Post Request for Bids Open - National 240,000.00 0.00 Canceled équipements techniques improved access to Envelope 30 05 16 16 20 16 pour les prestataires du markets PNRA CI-FIRCA-106489-GO-RFB / Acquisition de mobilier de bureau pour le Conseil du Coton et de l'Anacarde pour 1. Institutional Pending Single Stage - One 2020-04- 2020-04- 2020-06- 2020-07- 2020-08- 2021-02- l'Annexe du CCA au 2 IBRD / 88450 strengthening and value Post Request for Bids Open - National 101,000.00 0.00 Implement Envelope 15 20 01 01 05 01 Plateaux Vallon et pour les chain governance ation 4 DR du Conseil du Coton et de l'Anacarde devant accueillir les Consultants CI-FIRCA-106490-GO-RFB 1. Institutional Pending / Acquisition des Single Stage - One 2020-08- 2020-08- 2020-10- 2020-10- 2020-12- 2021-06- IBRD / 88450 strengthening and value Post Request for Bids Open - National 110,000.00 0.00 Implement équipements pour Envelope 15 20 01 31 05 03 chain governance ation l'interconnexion entre les différents sites du CCA CI-FIRCA-157581-GO-RFQ 4. Program coordination, Request for Single Stage - One 2020-03- 2020-04- 2020-05- 2020-06- 2020-11- / Acquisition d'ordinateurs IBRD / 88450 monitoring and knowledge Post Limited 20,000.00 17,717.11 Signed Quotations Envelope 11 15 06 15 02 portables pour l'UCP management CI-FIRCA-157597-GO-RFQ / Acquisition de matériel informatique (Rack pour 4. Program coordination, Server HP Proliant DL580 Request for Single Stage - One 2020-03- 2020-04- 2020-05- 2020-06- 2020-11- IBRD / 88450 monitoring and knowledge Post Limited 4,000.00 4,763.79 Signed Gen9, Cordon réseau Quotations Envelope 21 15 16 16 12 management Ethernet RJ45 de 3m (10) - Trousse maintenance info (Réseau, souffleur)….) CI-FIRCA-157599-GO-RFQ / Acquisition d'appareil 4. Program coordination, audiovisuel (Ecran TV 52" , Request for Single Stage - One 2020-03- 2020-04- 2020-05- 2020-06- 2020-11- 2020-07- IBRD / 88450 monitoring and knowledge Post Limited 19,000.00 12,623.80 Completed Appareil photos, Sono Quotations Envelope 21 15 16 10 12 15 management Mobile, dictaphones ...), vidéo projecteurs CI-FIRCA-157684-GO-RFQ 1. Institutional / Acquisition de tablettes Request for Single Stage - One 2020-03- 2020-09- 2020-05- 2020-11- 2020-11- 2021-03- IDA / V0300 strengthening and value Post Limited 28,000.00 23,190.55 Completed pour la collecte électronique Quotations Envelope 14 30 09 09 05 04 chain governance et le suivi des activités CI-FIRCA-157951-GO-RFQ 1. Institutional / Acquisition de matériel de Request for Single Stage - One 2020-03- 2020-10- 2020-05- 2020-12- 2020-11- IBRD / 88450 strengthening and value Post Limited 9,000.00 29,425.47 Signed nettoyage Haute Pression Quotations Envelope 22 16 17 01 13 chain governance (HP) (01 en station et 01 mobile) CI-FIRCA-157965-GO-RFQ 1. Institutional Request for Single Stage - One 2020-03- 2020-10- 2020-05- 2020-11- 2020-11- / Acquisition d'une station IBRD / 88450 strengthening and value Post Limited 11,000.00 47,681.14 Signed Quotations Envelope 28 16 23 26 19 de stockage d'azote chain governance CI-FIRCA-157972-GO-RFQ 1. Institutional / Acquisition de l'outillage Request for Single Stage - One 2020-03- 2020-05- 2020-05- 2020-07- 2020-11- IBRD / 88450 strengthening and value Post Limited 93,000.00 73,099.45 Signed du CITA (caisses à outils, Quotations Envelope 28 14 23 15 19 chain governance poste à souder...) CI-FIRCA-157977-GO-RFQ / Acquisition d'un ensemble 1. Institutional Request for Single Stage - One 2020-03- 2020-10- 2020-05- 2020-11- 2020-11- pour la maîtrise des bilans IBRD / 88450 strengthening and value Post Limited 19,000.00 58,684.48 Signed Quotations Envelope 28 16 23 26 19 matières (balances de chain governance pesées, poids étalons ...) CI-FIRCA-157984-GO-RFQ 1. Institutional Pending Request for Single Stage - One 2020-03- 2020-05- 2020-11- / Acquisition du mobilier IBRD / 88450 strengthening and value Post Limited 56,000.00 0.00 Implement Quotations Envelope 28 23 19 complémentaire du CITA chain governance ation CI-FIRCA-158227-GO-RFQ / Acquisition au profit de la 1. Institutional DOPA de compléments Request for Single Stage - One 2020-03- 2020-07- 2020-04- 2020-08- 2020-10- 2020-09- IBRD / 88450 strengthening and value Post Limited 9,000.00 9,163.40 Completed d'ordinateurs portables Quotations Envelope 04 28 29 25 26 09 chain governance destinés aux missions de terrain CI-FIRCA-77660-GO-RFB / 4. Program coordination, acquisition de 20 motos Single Stage - One 2018-07- 2018-10- 2018-10- 2018-12- 2019-01- 2019-02- 2020-08- IBRD / 88450 monitoring and knowledge Post Request for Bids Limited 34,000.00 0.00 Canceled pour renforcer le dispositif Envelope 25 10 10 19 18 22 15 management de collecte de données. CI-FIRCA-106493-GO-RFB / Acquisition de lecteurs 1. Institutional Single Stage - One 2019-03- 2019-04- 2019-05- 2019-06- 2019-07- 2020-01- (terminaux) des cartes IBRD / 88450 strengthening and value Post Request for Bids Open - National 110,000.00 0.00 Canceled Envelope 30 04 16 15 20 16 acquises pour les chain governance bénéficiaires du projet CI-FIRCA-157477-GO-DIR / Acquisition d'équipements 2. Productivity Pending technique et scientifique enhancement and 2020-03- 2020-04- 2020-05- 2020-11- IBRD / 88450 Post Direct Selection Direct 140,000.00 0.00 Implement complémentaires pour les improved access to 31 05 10 06 ation INRA du PNRA : markets equipement d’Analyse des sols CI-FIRCA-157478-GO-DIR / Acquisition d'équipements 2. Productivity Pending technique et scientifique enhancement and 2020-03- 2020-04- 2020-05- 2020-11- IBRD / 88450 Post Direct Selection Direct 140,000.00 0.00 Implement complémentaires pour les improved access to 31 05 10 06 ation INRA du PNRA:Equipements markets de physiologie végétale. CI-FIRCA-157472-GO-DIR / Acquisition d'équipements 2. Productivity Pending technique et scientifique enhancement and 2020-03- 2020-03- 2020-05- 2020-10- IBRD / 88450 Post Direct Selection Direct 280,000.00 0.00 Implement complémentaires pour les improved access to 22 27 01 28 ation INRA du PNRA : markets equipements de Biotechnologie CI-FIRCA-167394-GO-RFQ 4. Program coordination, 2020-04- 2019-08- 2020-04- 2019-09- 2020-05- 2019-09- 2020-11- / Acquisition de matériels IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 6,000.00 4,789.51 Signed 15 28 20 02 25 19 21 de bureau pour l'UCP-PPCA management CI-FIRCA-179996-GO-RFQ / ACQUISITION DE 4. Program coordination, Request for Single Stage - One 2020-06- 2020-07- 2020-08- 2020-08- 2021-02- 2020-11- MOBILIERS DE BUREAU POUR IBRD / 88450 monitoring and knowledge Post Limited 19,000.00 13,288.20 Completed Quotations Envelope 23 10 18 06 14 11 LE PERSONNEL DE GESTION management FIDUCIAIRE DU PPCA CI-FIRCA-180002-GO-RFQ 2. Productivity / SELECTION D'UN Pending enhancement and Request for Single Stage - One 2020-06- 2020-08- 2021-02- PRESTATAIRE POUR IBRD / 88450 Post Limited 30,000.00 0.00 Implement improved access to Quotations Envelope 21 16 12 L'EDITION DES FICHES DE ation markets VALIDATION DES PARCELLES REHABILITEES CI-FIRCA-157479-GO-RFQ 2. Productivity / Sélection d'un enhancement and Request for Single Stage - One 2020-02- 2020-04- 2020-10- fournisseurs pour IBRD / 88450 Post Limited 39,000.00 0.00 Canceled improved access to Quotations Envelope 29 25 22 l'acquisition des matières markets d'œuvres de construction des équipements CI-FIRCA-157480-GO-RFB / Sélection de fournisseur 2. Productivity Pending pour la fourniture enhancement and Single Stage - One 2020-02- 2020-02- 2020-04- 2020-05- 2020-06- 2020-12- IBRD / 88450 Post Request for Bids Open - National 14,000.00 0.00 Implement d'équipements improved access to Envelope 20 25 07 07 11 08 ation informatiques dans le cadre markets de la mise en oeuvre de l'e- extension CI-FIRCA-157502-GO-RFB 2. Productivity / Sélection de fournisseurs enhancement and Single Stage - One 2020-03- 2020-04- 2020-03- 2020-04- 2020-04- 2020-05- 2020-06- 2020-12- de produits fongicides pour IBRD / 88450 Post Request for Bids Open - National 326,000.00 0.00 Canceled improved access to Envelope 02 17 07 22 18 18 22 19 la protection des vergers markets réhabilités CI-FIRCA-191626-GO-RFQ / Acquisition des équipements informatiques 2. Productivity Pending pour la SODEXAM dans le enhancement and Request for Single Stage - One 2020-10- 2020-12- 2021-05- IBRD / 88450 Post Limited 20,000.00 0.00 Implement cadre de l'appui à la gestion improved access to Quotations Envelope 06 01 30 ation de la résilience des markets producteurs d'anacarde au changement climatique CI-FIRCA-191629-GO-RFQ / Acquisition de Logiciels de 2. Productivity Pending traitement et d'analyse enhancement and Request for Single Stage - One 2020-10- 2020-12- 2021-05- IBRD / 88450 Post Limited 20,000.00 0.00 Implement agrométéorologique improved access to Quotations Envelope 07 02 31 ation (licence tableau Creator, markets Viewer, Explorer) version serveur CI-FIRCA-82267-GO-RFQ / Acquérir un véhicule type 2. Productivity 4x4 pour les missions de enhancement and Request for Single Stage - One 2020-09- 2020-09- 2020-11- 2020-11- 2021-05- 2020-11- collecte des données de la IBRD / 88450 Post Limited 60,000.00 36,607.56 Completed improved access to Quotations Envelope 26 22 21 03 20 17 veille sanitaire dans le cadre markets du volet défense des cultures du PNRA CI-FIRCA-157493-GO-RFB 2. Productivity / Sélection de fournisseurs enhancement and Single Stage - One 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2021-01- de semences et de plants IBRD / 88450 Post Request for Bids Open - National 298,000.00 0.00 Canceled improved access to Envelope 31 05 17 16 21 17 dans le cadre du markets reboisement compensatoire CI-FIRCA-192569-GO-RFQ 1. Institutional / Acquisition du matériel Request for Single Stage - One 2020-09- 2020-09- 2020-11- 2020-11- 2021-05- 2020-11- IBRD / 88450 strengthening and value Post Limited 145,000.00 147,116.40 Completed roulant ( véhicules et Quotations Envelope 27 18 22 08 21 17 chain governance autobus) pour le CITA CI-FIRCA-192581-GO-RFQ 1. Institutional Pending Request for Single Stage - One 2020-09- 2020-11- 2021-05- / Acquisition de motos IBRD / 88450 strengthening and value Post Limited 4,000.00 0.00 Implement Quotations Envelope 26 21 20 pour le CITA chain governance ation CI-FIRCA-157939-GO-RFB 1. Institutional / Acquisition du matériel Single Stage - One 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- IBRD / 88450 strengthening and value Post Request for Bids Open - National 149,000.00 0.00 Canceled roulant (moto, véhicules et Envelope 17 22 03 02 07 03 chain governance autobus) pour le CITA CI-FIRCA-191620-GO-DIR / Sélection par entente 2. Productivity directe de INTEL AFRIQUE enhancement and 2020-09- 2020-11- 2020-10- 2020-10- 2020-11- 2020-12- 2021-05- 2020-12- pour l'acquisition de la IBRD / 88450 Post Direct Selection Direct 41,000.00 36,837.80 Completed improved access to 30 12 05 06 09 08 08 16 Licence informatique de markets communication de l'E- extension anacarde Page 3 CI-FIRCA-140582-GO-DIR / Acquisition d'équipements 2. Productivity techniques dans le cadre du enhancement and 2019-10- 2019-12- 2019-10- 2019-12- 2019-11- 2020-07- 2020-05- IBRD / 88450 Post Direct Selection Direct 140,000.00 231,547.62 Signed PNRA : équipements de improved access to 15 04 20 13 24 03 22 physiologie végétale (2ème markets tranche) CI-FIRCA-158219-GO-RFQ / Acquisition d'ordinateurs 1. Institutional portables dans le cadre du Request for Single Stage - One 2020-04- 2020-05- 2020-11- IBRD / 88450 strengthening and value Post Limited 82,000.00 0.00 Canceled renouvellement des Quotations Envelope 04 30 26 chain governance équipements des agents relais du CCA CI-FIRCA-158226-GO-RFQ / Acquisition de motos pour les agents relais et les 1. Institutional Pending Request for Single Stage - One 2020-03- 2020-05- 2020-11- Assistants des DR CCA de IBRD / 88450 strengthening and value Post Limited 50,000.00 0.00 Implement Quotations Envelope 21 16 12 Bondoukou, Bouna, chain governance ation Boundiali, Dimbokro, Katiola, Korhogo, Mankono, Odienné CI-FIRCA-157669-GO-RFQ / Acquisition de 1. Institutional Pending Request for Single Stage - One 2020-11- 2021-01- 2021-07- consommables IBRD / 88450 strengthening and value Post Limited 93,000.00 0.00 Implement Quotations Envelope 25 20 19 informatiques pour les chain governance ation imprimantes de cartes de producteurs CI-FIRCA-157685-GO-RFQ / Acquisition d'imprimantes 1. Institutional Request for Single Stage - One 2020-11- 2020-11- 2021-01- 2021-01- 2021-07- 2021-03- supplémentaires pour IBRD / 88450 strengthening and value Post Limited 28,000.00 56,925.66 Completed Quotations Envelope 25 30 20 11 19 16 imprimer les cartes des chain governance producteurs et autres acteurs CI-FIRCA-157678-GO-DIR 1. Institutional 2020-03- 2020-03- 2020-03- 2020-03- / Acquisition de 330 puces IBRD / 88450 strengthening and value Post Direct Selection 29,000.00 0.00 Canceled 07 07 07 07 data MTN avec 3 G0 par chain governance Mois CI-FIRCA-201985-GO-DIR 1. Institutional Pending 2020-11- 2020-11- 2020-12- 2021-06- / Acquisition de 330 puces IBRD / 88450 strengthening and value Post Direct Selection Direct 37,000.00 0.00 Implement 16 21 26 24 data avec 3 G0 par mois chain governance ation CI-FIRCA-158229-GO-RFQ / Acquisition au profit des 1. Institutional Pending Request for Single Stage - One 2021-01- 2021-03- 2021-09- SCOOP de transformation IBRD / 88450 strengthening and value Post Limited 93,000.00 0.00 Implement Quotations Envelope 25 22 18 de l'anacarde de kits pour le chain governance ation contrôle de qualité CI-FIRCA-157933-GO-RFQ / Acquisition et 1. Institutional installation de l'unité de Request for Single Stage - One 2020-07- 2020-08- 2021-02- IBRD / 88450 strengthening and value Post Limited 56,000.00 0.00 Canceled pyrolyse pour la Quotations Envelope 05 30 26 chain governance valorisation des coques en charbon au profit des ménages (sur le site du CITA) CI-FIRCA-157944-GO-RFB / Acquisition de matériel de 1. Institutional Single Stage - One 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- manutention pour le CITA IBRD / 88450 strengthening and value Post Request for Bids Open - National 112,000.00 0.00 Canceled Envelope 17 22 03 02 07 03 (Chariots 3T; 1,5T; 02 chain governance transpalettes...) CI-FIRCA-201986-GO-RFQ 1. Institutional Under / Acquisition de matériels Request for Single Stage - One 2020-12- 2020-12- 2021-01- 2021-07- IBRD / 88450 strengthening and value Post Limited 25,000.00 0.00 Implement de manutention Quotations Envelope 05 10 30 29 chain governance ation électromécanisée pour le CITA CI-FIRCA-201987-GO-RFQ 1. Institutional Under / Acquisition de matériels Request for Single Stage - One 2020-12- 2020-12- 2021-01- 2021-07- IBRD / 88450 strengthening and value Post Limited 31,000.00 0.00 Implement de manutention manuelle Quotations Envelope 05 03 30 29 chain governance ation pour le CITA CI-FIRCA-201988-GO-RFQ 1. Institutional Pending / Acquisition de matériels Request for Single Stage - One 2020-12- 2021-01- 2021-07- IBRD / 88450 strengthening and value Post Limited 56,000.00 0.00 Implement de manutention motorisée Quotations Envelope 05 30 29 chain governance ation pour le CITA CI-FIRCA-157979-GO-RFQ / Acquisition du matériel 1. Institutional Pending Request for Single Stage - One 2021-01- 2021-03- 2021-09- de Communication IBRD / 88450 strengthening and value Post Limited 60,000.00 0.00 Implement Quotations Envelope 10 07 03 audiovisuel du CITA chain governance ation (Téléphone, Internet, vidéosurveillance) CI-FIRCA-157987-GO-RFQ / Acquisition d' 1. Institutional Equipements du centre Request for Single Stage - One 2020-03- 2020-05- 2020-11- IBRD / 88450 strengthening and value Post Limited 19,000.00 0.00 Canceled médical du CITA (table de Quotations Envelope 28 23 19 chain governance consultation, lits d'observation, matériel médical...) CI-FIRCA-157934-GO-RFQ / Acquisition du matériel 1. Institutional Pending Request for Single Stage - One 2020-12- 2021-02- 2021-08- didactique pour le centre de IBRD / 88450 strengthening and value Post Limited 60,000.00 0.00 Implement Quotations Envelope 15 09 08 formation (matériel de chain governance ation projection) CI-FIRCA-201993-GO-RFQ / Acquisition du matériel 1. Institutional Pending Request for Single Stage - One 2020-12- 2021-02- 2021-08- didactique pour le centre de IBRD / 88450 strengthening and value Post Limited 50,000.00 0.00 Implement Quotations Envelope 15 09 08 formation (matériel de chain governance ation visioconférence) CI-FIRCA-74650-GO-RFQ 1. Institutional Pending Request for Single Stage - One 2020-11- 2021-01- 2021-07- / Acquisition d'équipements IBRD / 88450 strengthening and value Post Limited 20,000.00 0.00 Implement Quotations Envelope 14 09 08 pour le contrôle qualité chain governance ation CI-FIRCA-126701-GO-RFB 1. Institutional / Acquisition et installation Single Stage - One 2020-08- 2020-08- 2020-10- 2020-11- 2020-12- 2021-06- IBRD / 88450 strengthening and value Post Request for Bids Open - National 260,000.00 0.00 Canceled des équipements du Envelope 20 25 06 05 10 08 chain governance laboratoire du CITA CI-FIRCA-106402-GO-RFB / Acquisition du matériel 1. Institutional Pending Single Stage - One 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- pour le systeme IBRD / 88450 strengthening and value Post Request for Bids Open - National 838,000.00 0.00 Implement Envelope 30 05 16 15 22 18 d'information du CCA chain governance ation (besoins du SYSPER et autres besoins) CI-FIRCA-126699-GO-RFQ / Acquisition et installation 2. Productivity de système d'électrification enhancement and Request for Single Stage - One 2020-11- 2021-01- 2021-07- solaire (équipements + IBRD / 88450 Post Limited 70,000.00 0.00 Canceled improved access to Quotations Envelope 14 09 08 installation) markets d’opérationnalisation des 3 CDC priorisés CI-FIRCA-126698-GO-RFQ 2. Productivity / Acquisition de matériel enhancement and Request for Single Stage - One 2020-11- 2021-01- 2021-07- roulant (moto et tricycle) IBRD / 88450 Post Limited 30,000.00 0.00 Canceled improved access to Quotations Envelope 11 06 05 /site pour markets l’opérationnalisation des 3 CDC priorisés CI-FIRCA-126704-GO-RFQ 2. Productivity / Acquisition de matériels enhancement and Request for Single Stage - One 2021-02- 2021-04- 2021-09- d’arrosage des essais des 3 IBRD / 88450 Post Limited 15,000.00 0.00 Canceled improved access to Quotations Envelope 06 03 30 CDC priorisés (Koflandé, markets Badikaha, Koro Sana-koro) CI-FIRCA-106664-GO-RFQ / Acquisition de logiciels 4. Program coordination, Request for Single Stage - One 2020-05- 2020-06- 2020-12- bureautiques et de gestion IBRD / 88450 monitoring and knowledge Post Limited 10,000.00 0.00 Canceled Quotations Envelope 05 30 27 de données et des management graphiques (Office, edraw max) CI-FIRCA-157482-GO-DIR / Sélection de fournisseurs 2. Productivity de plants greffés pour la enhancement and 2020-03- 2020-04- 2020-05- 2020-11- création de nouvelles IBRD / 88450 Post Direct Selection Direct 255,000.00 0.00 Canceled improved access to 31 05 10 06 plantations (105 plants/ha markets sur une superficie de 2000 ha) à raison de 650 CFA/plant greffé CI-FIRCA-157489-GO-RFB 2. Productivity / sélection de fournisseurs enhancement and Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- pour l'acquisition IBRD / 88450 Post Request for Bids Open - National 140,000.00 0.00 Canceled improved access to Envelope 02 07 19 18 22 21 d'équipements techniques markets des 3 CDC CI-FIRCA-126684-GO-RFQ / Acquisition et installation 2. Productivity des équipements enhancement and Request for Single Stage - One 2020-10- 2020-11- 2021-05- informatiques pour IBRD / 88450 Post Limited 20,000.00 0.00 Canceled improved access to Quotations Envelope 04 29 28 l’opérationnalisation de la markets Coordination scientifique du PNRA et des 3 CDC priorisés CI-FIRCA-157569-GO-RFB / Selection d'un prestataire 3. Support to private pour l'acquisition et investment in post-harvest Single Stage - One 2020-03- 2020-03- 2020-05- 2020-05- 2020-07- 2021-01- IBRD / 88450 Post Request for Bids Open - National 149,000.00 0.00 Canceled l'installation de 100 kits and processing Envelope 15 20 01 31 05 01 pour poursuivre le infrastructure programme d'installation des unités de décorticage CI-FIRCA-106668-GO-RFQ 4. Program coordination, Request for Single Stage - One 2020-05- 2020-07- 2021-01- / Achats petits matériels et IBRD / 88450 monitoring and knowledge Post Limited 10,000.00 0.00 Canceled Quotations Envelope 23 18 14 outillages techniques management CI-FIRCA-82283-GO-RFQ 4. Program coordination, / Acquisition et installation Request for Single Stage - One 2020-10- 2020-12- 2021-06- IBRD / 88450 monitoring and knowledge Post Limited 33,000.00 0.00 Canceled de mobiliers de bureau pour Quotations Envelope 24 19 17 management l'annexe 2 du PPCA CI-FIRCA-157583-GO-RFB / Acquisition des licences 4. Program coordination, utilisateurs (systèmes Single Stage - One 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2021-01- IBRD / 88450 monitoring and knowledge Post Request for Bids Open - National 186,000.00 0.00 Canceled d'exploitation, suite Envelope 30 04 16 15 20 16 management bureautique, EndpointSecurity, BI, 3CX)… CI-FIRCA-157598-GO-RFQ / Production et installation 4. Program coordination, Pending de panneaux et pancartes Request for Single Stage - One 2021-01- 2021-03- 2021-09- IBRD / 88450 monitoring and knowledge Post Limited 19,000.00 0.00 Implement signalétiques GRIN CITA Quotations Envelope 20 17 13 management ation etc., plaque d’identification pour bureau CI-FIRCA-157600-GO-RFQ 4. Program coordination, Pending Request for Single Stage - One 2021-01- 2021-03- 2021-09- / Acquisition de fournitures IBRD / 88450 monitoring and knowledge Post Limited 16,000.00 0.00 Implement Quotations Envelope 13 10 06 informatiques management ation CI-FIRCA-157601-GO-RFQ 4. Program coordination, Pending Request for Single Stage - One 2021-01- 2021-03- 2021-09- / Acquisition de fournitures IBRD / 88450 monitoring and knowledge Post Limited 47,000.00 0.00 Implement Quotations Envelope 13 10 06 de bureau pour l'UCP management ation CI-FIRCA-157595-GO-RFQ / Renouvellement antivirus, 4. Program coordination, Request for Single Stage - One 2020-04- 2020-05- 2020-11- cartouches d'imprimantes, IBRD / 88450 monitoring and knowledge Post Limited 9,000.00 0.00 Canceled Quotations Envelope 04 30 26 domaine ;Achat de disque management dur 3T pour le serveur (2) CI-FIRCA-157593-GO-RFQ / Renouvellement antivirus, 4. Program coordination, Pending Request for Single Stage - One 2021-01- 2021-03- 2021-09- cartouches d'imprimantes, IBRD / 88450 monitoring and knowledge Post Limited 9,000.00 0.00 Implement Quotations Envelope 16 13 09 domaine ;Achat de disque management ation dur 3T pour le serveur (2) CI-FIRCA-202091-GO-RFQ / Sélection d'une entreprise 4. Program coordination, Pending Request for Single Stage - One 2021-01- 2021-03- 2021-08- pour la production de IBRD / 88450 monitoring and knowledge Post Limited 65,000.00 0.00 Implement Quotations Envelope 04 01 28 supports de sensibilisation management ation (MGP, PGP, SCP) CI-FIRCA-202092-GO-RFQ 1. Institutional Pending Request for Single Stage - One 2020-11- 2021-01- 2021-07- / Acquisition d'un véhicule IBRD / 88450 strengthening and value Post Limited 51,000.00 0.00 Implement Quotations Envelope 15 10 09 pour l'ESA chain governance ation CI-FIRCA-158228-GO-RFQ / Acquisition du matériel de 1. Institutional Request for Single Stage - One 2020-04- 2020-06- 2020-12- stickage des IBRD / 88450 strengthening and value Post Limited 56,000.00 0.00 Canceled Quotations Envelope 18 13 10 immobilisations du Conseil chain governance du Coton et de l'Anacarde CI-FIRCA-74625-GO-RFB / Acquisition de logiciel comprenant la formation 4. Program coordination, (finance et Comptabilité, Single Stage - One 2020-05- 2020-05- 2020-06- 2020-07- 2020-08- 2021-02- IBRD / 88450 monitoring and knowledge Post Request for Bids Open - National 125,000.00 0.00 Canceled Suivi et évaluation, Envelope 05 10 21 21 25 21 management Microsoft Office, Statistique et Planification) pour l'UCP et pour le CCA CI-FIRCA-203484-GO-RFQ / Acquisition de logiciel comprenant la formation 4. Program coordination, Pending Request for Single Stage - One 2020-12- 2021-01- 2021-07- (Analyse de données, IBRD / 88450 monitoring and knowledge Post Limited 50,000.00 0.00 Implement Quotations Envelope 05 30 29 Statistique) pour l'UCP et management ation pour le CCA STATA, SPSS, POWER BI CI-FIRCA-203557-GO-RFB / Acquisition d'équipements 2. Productivity Pending techniques dans le cadre du enhancement and Single Stage - One 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Request for Bids Open - National 140,000.00 0.00 Implement PNRA : Equipements improved access to Envelope 30 05 16 15 22 18 ation d'analyse des sols et markets mesures (2ème tranche) CI-FIRCA-203574-GO-RFB / Acquisition d'équipements 2. Productivity Pending techniques dans le cadre du enhancement and Single Stage - One 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Request for Bids Open - National 280,000.00 0.00 Implement PNRA : équipements improved access to Envelope 30 05 16 15 22 18 ation biotechnologiques (2ème markets tranche) CI-PPCA-224879-GO-RFB 3. Support to private Pending / Acquérir et installer les investment in post-harvest Single Stage - One 2021-08- 2021-08- 2021-10- 2021-11- 2021-12- 2022-06- IBRD / 88450 Post Request for Bids Open - National 372,000.00 0.00 Implement équipements du laboratoire and processing Envelope 16 21 02 01 06 04 ation central du CITA (provision) infrastructure CI-PPCA-224881-GO-RFB / Acquisition et installation 3. Support to private Pending de kits de décorticage au investment in post-harvest Single Stage - One 2021-09- 2021-09- 2021-10- 2021-11- 2021-12- 2022-06- IBRD / 88450 Post Request for Bids Open - National 745,000.00 0.00 Implement sein des sociétés and processing Envelope 01 06 18 17 22 20 ation coopératives de la zone de infrastructure production pour la phase de mise à échelle CI-PPCA-225015-GO-RFQ 4. Program coordination, Pending Request for Single Stage - One 2021-06- 2021-08- 2022-02- / Achat de consommable IBRD / 88450 monitoring and knowledge Post Limited 28,000.00 0.00 Implement Quotations Envelope 20 15 11 informatique management ation CI-PPCA-225018-GO-RFQ / Achat de ordinateurs (portables et desktop), Scanners, et d’imprimantes 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-07- 2022-01- et achat de licences IBRD / 88450 monitoring and knowledge Post Limited 65,000.00 0.00 Implement Quotations Envelope 15 10 06 antivirus, Licence de logiciel management ation et produit de nettoyage de PC, clé USB, disques durs externe pour le transfert des documents CI-PPCA-225022-GO-RFQ / Achat de logiciels 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-07- 2022-01- informatiques (plateforme IBRD / 88450 monitoring and knowledge Post Limited 19,000.00 0.00 Implement Quotations Envelope 15 10 06 collaborative, traitement management ation d'images et de vidéos etc.) CI-PPCA-225030-GO-RFQ 4. Program coordination, Pending Request for Single Stage - One 2021-04- 2021-06- 2021-12- / Achat d'un photocopieur IBRD / 88450 monitoring and knowledge Post Limited 6,000.00 0.00 Implement Quotations Envelope 25 20 17 pour l'UCP management ation CI-PPCA-225035-GO-RFQ / Acquérir et fournir à des centres de santé locales des 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-07- 2022-01- équipements et produits IBRD / 88450 monitoring and knowledge Post Limited 37,000.00 0.00 Implement Quotations Envelope 25 20 16 médicaux de prise en management ation charge médicale des personnes intoxiquées aux pesticides CI-PPCA-225046-GO-RFQ / Acquérir des Equipements 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-07- 2022-01- de Protection Individuelle IBRD / 88450 monitoring and knowledge Post Limited 94,000.00 0.00 Implement Quotations Envelope 12 07 03 (EPI) et extincteurs pour le management ation personnel de l'UC PPCA Page 4 CI-PPCA-225054-GO-RFQ / Acquérir des matériels techniques pour la gestion 4. Program coordination, Pending Request for Single Stage - One 2021-07- 2021-09- 2022-03- des mesures de sauvegarde IBRD / 88450 monitoring and knowledge Post Limited 8,000.00 0.00 Implement Quotations Envelope 10 04 03 environnementale (appareils management ation GPS, appareils photo et sonomètres) CI-PPCA-225078-GO-RFQ / Acquérir des gadgets et 4. Program coordination, Pending Request for Single Stage - One 2021-06- 2021-08- 2022-02- supports de communication IBRD / 88450 monitoring and knowledge Post Limited 37,000.00 0.00 Implement Quotations Envelope 27 22 18 (plaquette, gilet multipoche, management ation chasuble, t-shirt, polo, etc.) CI-PPCA-225080-GO-RFQ / Acquérir des équipements 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-07- 2022-01- pour le renforcement de la IBRD / 88450 monitoring and knowledge Post Limited 10,000.00 0.00 Implement Quotations Envelope 10 05 01 couverture réseau wifi des management ation locaux du PPCA CI-PPCA-225567-GO-RFQ / Acquérir le mobilier de 1. Institutional Pending bureau pour l'Annexe du Request for Single Stage - One 2021-06- 2021-08- 2022-02- IBRD / 88450 strengthening and value Post Limited 67,000.00 0.00 Implement CCA au 2 Plateaux Vallon et Quotations Envelope 22 17 13 chain governance ation pour les 4 DR CCA de Bondoukou, Bouaké, Korhogo et Séguéla CI-PPCA-225570-GO-RFQ 1. Institutional Pending Request for Single Stage - One 2021-07- 2021-09- 2022-03- / Acquérir l'outillage IBRD / 88450 strengthening and value Post Limited 37,000.00 0.00 Implement Quotations Envelope 17 11 10 complémentaire du CITA (.) chain governance ation CI-PPCA-225576-GO-RFQ 1. Institutional Pending / Acquérir d’équipements Request for Single Stage - One 2021-05- 2021-07- 2022-01- IBRD / 88450 strengthening and value Post Limited 93,000.00 0.00 Implement audiovisuel (camera, Quotations Envelope 10 05 01 chain governance ation audiovisuel) 1. Institutional Pending CI-PPCA-225581-GO-RFQ Request for Single Stage - One 2021-06- 2021-07- 2022-01- IBRD / 88450 strengthening and value Post Limited 3,000.00 0.00 Implement / Acquérir un sonomètre Quotations Envelope 05 31 27 chain governance ation CI-PPCA-225586-GO-RFB 2. Productivity / Acquérir la deuxième Pending enhancement and Single Stage - One 2021-06- 2021-06- 2021-08- 2021-09- 2021-10- 2022-04- tranche des équipements IBRD / 88450 Post Request for Bids Open - National 559,000.00 0.00 Implement improved access to Envelope 25 30 11 10 15 13 techniques et scientifiques ation markets des INRA du PNRA CI-PPCA-225590-GO-RFQ 2. Productivity Pending Request for Single Stage - One 2021-07- 2021-09- 2022-03- / Acquérir le matériel IBRD / 88450 enhancement and Post Limited 95,000.00 0.00 Implement Quotations Envelope 31 25 24 technique des INRA du improved access to ation PNRA markets CI-PPCA-225594-GO-RFB 2. Productivity Pending Single Stage - One 2021-07- 2021-07- 2021-09- 2021-10- 2021-11- 2022-05- / Acquérir les équipements IBRD / 88450 enhancement and Post Request for Bids Open - National 140,000.00 0.00 Implement Envelope 21 26 06 06 10 09 techniques de 3 CDC improved access to ation markets CI-PPCA-225595-GO-RFB 2. Productivity Pending / Acquérir des équipements enhancement and Single Stage - One 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2022-04- IBRD / 88450 Post Request for Bids Open - National 250,000.00 0.00 Implement techniques pour 100 kits improved access to Envelope 30 05 16 15 20 18 ation d'OPCA markets CI-PPCA-225597-GO-RFQ 2. Productivity Pending / Acquérir des équipements enhancement and Request for Single Stage - One 2021-09- 2021-10- 2022-04- IBRD / 88450 Post Limited 60,000.00 0.00 Implement informatiques de la improved access to Quotations Envelope 04 30 28 ation SODEXAM et du CIRES markets CI-PPCA-225602-GO-RFB / Acquérir des produits 2. Productivity (insecticides, fongicides, Pending enhancement and Single Stage - One 2021-06- 2021-06- 2021-08- 2021-08- 2021-10- 2022-04- engrais foliaires organiques) IBRD / 88450 Post Request for Bids Open - National 1,511,000.00 0.00 Implement improved access to Envelope 15 20 01 31 05 03 pour la protection, ation markets fertilisation des vergers réhabilités CI-PPCA-225604-GO-RFQ 2. Productivity / Acquérir des semences Pending enhancement and Request for Single Stage - One 2021-06- 2021-07- 2022-01- pour les cultures IBRD / 88450 Post Limited 47,000.00 0.00 Implement improved access to Quotations Envelope 03 29 25 intercalaires (autres que le ation markets soja) dans les parcelles de producteurs CI-PPCA-225610-GO-RFB 2. Productivity / Acquérir un lysimètre Pending enhancement and Single Stage - One 2021-07- 2021-07- 2021-09- 2021-10- 2021-11- 2022-05- pour la sélection des IBRD / 88450 Post Request for Bids Open - National 112,000.00 0.00 Implement improved access to Envelope 21 26 06 06 10 09 anacardiers tolérants au ation markets déficit hydrique pour le CNRA CI-FIRCA-234283-GO-RFQ / Acquisition et installation 1. Institutional Pending de l'unité de pyrolyse pour Request for Single Stage - One 2021-07- 2021-08- 2022-02- IBRD / 88450 strengthening and value Post Limited 55,866.00 0.00 Implement la valorisation des coques Quotations Envelope 05 30 26 chain governance ation en charbon au profit des ménages (sur le site du CITA) NON CONSULTING SERVICES Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificatio Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process n (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual CI-FIRCA-68053-NC-RFQ / 4. Program coordination, Request for Single Stage - One 2018-10- 2018-11- 2019-05- Fourniture de carburant IBRD / 88450 monitoring and knowledge Post Limited 13,000.00 0.00 Canceled Quotations Envelope 05 30 29 pour les activités management CI-FIRCA-76398-NC-DIR / 3. Support to private Location d'un Bâtiment à investment in post-harvest 2018-11- 2018-11- 2018-12- 2019-01- 2019-06- 2019-04- IBRD / 88450 Post Direct Selection Direct 50,000.00 47,066.00 Completed usage de local technique and processing 09 14 19 17 17 30 pour l'ARRE infrastructure CI-FIRCA-76423-NC-RFQ / 4. Program coordination, Request for Single Stage - One 2018-10- 2019-06- 2018-12- 2019-08- 2019-06- Entretien des climatiseurs et IBRD / 88450 monitoring and knowledge Post Limited 40,000.00 1,257.24 Signed Quotations Envelope 10 28 05 19 03 Splits de l'UCP management CI-FIRCA-76712-NC-RFQ / 4. Program coordination, Recrutement d'un Request for Single Stage - One 2018-11- 2019-11- 2018-12- 2019-12- 2019-06- IBRD / 88450 monitoring and knowledge Post Limited 15,000.00 51,451.00 Signed prestataire pour la Quotations Envelope 04 06 30 23 28 management maintenance informatique de l'UCP CI-FIRCA-76713-NC-RFQ / Assurance Maladie 4. Program coordination, Request for Single Stage - One 2018-10- 2018-12- 2018-12- 2019-05- 2019-06- 2019-07- Individuel Accident des IBRD / 88450 monitoring and knowledge Post Limited 99,000.00 45,369.30 Completed Quotations Envelope 09 18 04 11 02 04 agents de l'UCP , accident management multirisques professionnels CI-FIRCA-68047-NC-DIR / 4. Program coordination, 2018-07- 2018-08- 2018-09- 2018-10- 2019-03- Contrat de location des IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 53,000.00 51,158.70 Signed 31 05 09 12 08 locaux de l'UGP pour 7 management mois CI-FIRCA-82348-NC-RFQ / 1. Institutional Request for Single Stage - One 2018-10- 2018-10- 2018-12- 2018-11- 2019-06- 2018-11- Aménagement d'espaces IBRD / 88450 strengthening and value Post Limited 99,000.00 15,185.61 Completed Quotations Envelope 23 19 18 02 16 06 d'exposition pour le SIETTA chain governance CI-FIRCA-82350-NC-RFQ / 1. Institutional Fourniture et installation Request for Single Stage - One 2018-10- 2018-10- 2018-12- 2018-11- 2019-06- 2018-11- IBRD / 88450 strengthening and value Post Limited 99,000.00 85,974.74 Completed d'un système audio vidéo au Quotations Envelope 27 19 22 06 20 06 chain governance SIETTA CI-FIRCA-82349-NC-DIR / 1. Institutional Location d'espace couvert 2018-10- 2018-10- 2018-10- 2018-12- 2018-11- 2019-05- 2018-11- IBRD / 88450 strengthening and value Post Direct Selection Direct 36,000.00 30,695.22 Completed au palais de la culture pour 22 27 19 01 06 30 10 chain governance le SIETTA CI-FIRCA-82352-NC-DIR / Contrat de maintenance avec DATASOFT pour la 1. Institutional Pending maintenance du Système 2018-12- 2018-12- 2019-01- 2019-07- IBRD / 88450 strengthening and value Post Direct Selection Direct 12,000.00 0.00 Implement électronique de gestion 17 22 26 25 chain governance ation intégrée des règlements des dépenses relatives à la mise en œuvre du projet CI-FIRCA-106704-NC-RFQ / Doter la DOPA d'un Wifi performant et d'un réseau informatique filaire dans les 1. Institutional bureaux de la DOPA en vue Request for Single Stage - One 2019-04- 2019-12- 2019-06- 2020-02- 2019-11- 2020-10- IBRD / 88450 strengthening and value Post Limited 13,000.00 15,548.41 Completed d'assurer une fluidité de Quotations Envelope 06 03 01 18 28 27 chain governance communication avec les différents acteurs et d'une connexion internet par fibre optique CI-FIRCA-106722-NC-RFQ / Sélection d'un prestataire 1. Institutional Pending Request for Single Stage - One 2019-04- 2019-06- 2019-11- pour la Maintenance et IBRD / 88450 strengthening and value Post Limited 19,000.00 0.00 Implement Quotations Envelope 06 01 28 l'assistance annuelles du chain governance ation matériel dédié au LOGISCOOP CI-FIRCA-106728-NC-RFQ 4. Program coordination, / Sélection d'une structure Request for Single Stage - One 2019-03- 2019-04- 2019-05- 2019-06- 2019-11- IBRD / 88450 monitoring and knowledge Post Limited 50,000.00 21,302.07 Signed de Gardiennage des Quotations Envelope 23 16 18 18 14 management bureaux de l'UCP PPCA CI-FIRCA-106737-NC-RFQ 4. Program coordination, Request for Single Stage - One 2019-03- 2019-04- 2019-05- 2019-04- 2019-11- / Sélection d'un prestataire IBRD / 88450 monitoring and knowledge Post Limited 37,000.00 22,021.96 Signed Quotations Envelope 23 04 18 30 14 pour le Nettoyage de l'UCP management CI-FIRCA-106927-NC-RFQ 4. Program coordination, / Abonnement et mise en Request for Single Stage - One 2019-03- 2019-06- 2019-05- 2019-07- 2019-11- IBRD / 88450 monitoring and knowledge Post Limited 37,000.00 6,239.53 Signed place d'une ligne de Quotations Envelope 24 14 19 30 15 management connexion internet haut débit UCP CI-FIRCA-68051-NC-RFQ / 4. Program coordination, Request for Single Stage - One 2018-10- 2018-12- 2019-06- Assurance des 5 véhicules IBRD / 88450 monitoring and knowledge Post Limited 34,000.00 0.00 Canceled Quotations Envelope 09 04 02 et des 20 motos management CI-FIRCA-76394-NC-RFQ / 4. Program coordination, recrutement d'une Request for Single Stage - One 2018-10- 2018-12- 2019-05- IBRD / 88450 monitoring and knowledge Post Limited 80,000.00 0.00 Canceled assurance pour l'assurance Quotations Envelope 06 01 30 management des véhicules du projet CI-FIRCA-106724-NC-RFQ 4. Program coordination, Pending / Entente directe avec 2020-05- 2020-05- 2020-06- 2020-12- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 9,000.00 0.00 Implement GEDEX pour le transport de 08 13 17 14 management ation plis au niveau national CI-FIRCA-157512-NC-DIR 2. Productivity Pending 2020-04- 2020-05- 2020-06- 2020-12- / Entretien et surveillance IBRD / 88450 enhancement and Post Direct Selection Direct 65,000.00 0.00 Implement 30 05 09 06 des sites du PAVA improved access to ation markets CI-FIRCA-82351-NC-DIR / Transport et dédouanement 1. Institutional des équipements pour 2018-11- 2018-11- 2018-12- 2019-06- IBRD / 88450 strengthening and value Post Direct Selection Direct 100,000.00 0.00 Canceled l'exposition en vue de la 08 13 18 16 chain governance vulgarisation des technologies lors du SIETTA CI-FIRCA-157723-NC-RFQ 1. Institutional Pending Request for Single Stage - One 2020-03- 2020-05- 2020-11- / Location d'un Datacenter IBRD / 88450 strengthening and value Post Limited 55,000.00 0.00 Implement Quotations Envelope 11 06 02 pour l'ARRE chain governance ation CI-FIRCA-108083-NC-DIR 4. Program coordination, Pending / Entente directe avec 2020-05- 2020-05- 2020-06- 2020-12- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 18,000.00 0.00 Implement AFRICAUTO pour l'entretien 11 16 20 17 management ation et les réparations des véhicules CI-FIRCA-106734-NC-DIR / Entente directe avec le 4. Program coordination, Pending 2020-05- 2020-05- 2020-06- 2020-12- concessionnaire CFAO pour IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 19,000.00 0.00 Implement 12 17 21 18 l'entretien et les réparations management ation de véhicules CI-FIRCA-158888-NC-RFQ 4. Program coordination, Pending / Sélection d'un prestataire Request for Single Stage - One 2020-03- 2020-04- 2020-10- IBRD / 88450 monitoring and knowledge Post Limited 19,000.00 0.00 Implement pour la Maintenance Quotations Envelope 04 29 26 management ation préventive des équipements CI-FIRCA-158231-NC-DIR 4. Program coordination, Pending 2020-09- 2020-09- 2020-10- 2021-04- / Renouvellement du IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 67,000.00 0.00 Implement 15 20 25 23 Contrat de bail du management ation PPCA(renouvellement) CI-FIRCA-158233-NC-DIR 4. Program coordination, 2020-05- 2020-04- 2020-05- 2019-04- 2020-06- 2020-04- 2020-12- / Sélection d'un prestataire IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 22,000.00 24,479.00 Signed 15 30 20 04 24 30 21 pour l'entretien des locaux management du PPCA CI-FIRCA-158234-NC-DIR / Sélection d'un prestataire 4. Program coordination, 2020-05- 2020-06- 2020-05- 2020-06- 2020-06- 2020-06- 2020-12- pour le gardiennage des IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 28,000.00 23,335.20 Signed 15 18 20 18 24 18 21 bureaux du PPCA management (renouvellement) CI-FIRCA-82347-NC-DIR / Location d'un Datacenter 3. Support to private auprès d'un Opérateur Local investment in post-harvest Request for Single Stage - One 2018-12- 2019-01- 2019-07- IBRD / 88450 Post Limited 80,000.00 0.00 Canceled pour l'hébergement de la and processing Quotations Envelope 05 30 29 Plateforme électronique infrastructure pour l'ARRE CI-FIRCA-76403-NC-RFQ / 4. Program coordination, Request for Single Stage - One 2018-11- 2018-12- 2019-06- Entretien des bureaux de IBRD / 88450 monitoring and knowledge Post Limited 30,000.00 0.00 Canceled Quotations Envelope 05 31 29 l'UCP management CI-FIRCA-76716-NC-RFQ / 4. Program coordination, Gardiennage des locaux de Request for Single Stage - One 2018-11- 2018-12- 2019-06- IBRD / 88450 monitoring and knowledge Post Limited 50,000.00 0.00 Canceled l'UCP et la Géolocalisation Quotations Envelope 04 30 28 management des véhicules CI-FIRCA-106923-NC-DIR 4. Program coordination, / Entente directe avec DHL 2019-03- 2019-03- 2019-04- 2019-10- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 10,000.00 0.00 Canceled pour le transport de plis au 19 24 28 25 management niveau international CI-FIRCA-159698-NC-DIR 1. Institutional Pending / Entente Directe avec 3D 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 88450 strengthening and value Post Direct Selection Direct 12,000.00 0.00 Implement Solution pour la 02 07 11 08 chain governance ation maintenance du LOGISCOOP CI-FIRCA-160033-NC-DIR / Sélection d'OPCA pour la 2. Productivity Pending réalisation des travaux de enhancement and 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 88450 Post Direct Selection Direct 1,847,000.00 0.00 Implement réhabilitation des vergers improved access to 16 21 25 22 ation d'anacardiers de la DR markets NORD ANADER CI-FIRCA-160035-NC-DIR / Sélection d'OPCA pour la 2. Productivity Pending réalisation des travaux de enhancement and 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 88450 Post Direct Selection Direct 375,000.00 0.00 Implement réhabilitation des vergers improved access to 15 20 24 21 ation d'anacardiers de la DR markets OUEST ANADER CI-FIRCA-160037-NC-DIR / Sélection d'OPCA pour la 2. Productivity Pending réalisation des travaux de enhancement and 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 88450 Post Direct Selection Direct 744,000.00 0.00 Implement réhabilitation des vergers improved access to 15 20 24 21 ation d'anacardiers de la DR markets Centre-Ouest ANADER CI-FIRCA-160038-NC-DIR / Sélection d'OPCA pour la 2. Productivity Pending réalisation des travaux de enhancement and 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 88450 Post Direct Selection Direct 1,358,000.00 0.00 Implement réhabilitation des vergers improved access to 16 21 25 22 ation d'anacardiers de la DR markets CENTRE ANADER CI-FIRCA-160041-NC-DIR / Sélection d'OPCA pour la 2. Productivity Pending réalisation des travaux de enhancement and 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 88450 Post Direct Selection Direct 981,000.00 0.00 Implement réhabilitation des vergers improved access to 16 21 25 22 ation d'anacardiers de la DR markets Centre-Est ANADER CI-FIRCA-180151-NC-RFQ 2. Productivity / EDITION DES FICHES DE enhancement and Request for Single Stage - One 2020-06- 2020-06- 2020-08- 2020-06- 2021-02- 2020-07- IBRD / 88450 Post Limited 30,000.00 27,823.10 Completed VALIDATION DES PARCELLES improved access to Quotations Envelope 24 09 19 19 15 08 RÉHABILITÉES markets Page 5 CI-FIRCA-191632-NC-RFB / Recrutement des 2. Productivity Pending prestataires pour la enhancement and Single Stage - One 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Request for Bids Open - National 186,000.00 0.00 Implement réalisation des opérations improved access to Envelope 19 24 05 04 11 07 ation de reboisement markets compensatoire de 150 ha en 2021 CI-FIRCA-106702-NC-RFQ 1. Institutional Pending / Mise en place d'une ligne Request for Single Stage - One 2021-01- 2021-03- 2021-09- IBRD / 88450 strengthening and value Post Limited 37,000.00 0.00 Implement de connexion internet haut Quotations Envelope 16 13 09 chain governance ation débit au CCA/CITA CI-FIRCA-106932-NC-DIR / Sélection d'un prestataire 4. Program coordination, pour procéder à la collecte, 2020-07- 2020-07- 2020-08- 2021-02- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 4,000.00 0.00 Canceled au stockage et à 01 06 10 06 management l'élimination finale des produits chimiques périmés CI-FIRCA-202083-NC-RFQ 1. Institutional / Assurance des matériels Request for Single Stage - One 2020-12- 2020-09- 2021-02- 2020-11- 2021-08- 2020-11- IBRD / 88450 strengthening and value Post Limited 25,000.00 146,720.36 Signed roulant du CITA (Autobus, Quotations Envelope 20 18 14 08 13 17 chain governance Véhicules etc) CI-FIRCA-157576-NC-DIR 2. Productivity / Apporter un appui à la enhancement and 2020-03- 2020-03- 2020-04- 2020-10- mise en place des sites des IBRD / 88450 Post Direct Selection Direct 38,000.00 0.00 Canceled improved access to 16 21 25 22 essais et des tests de markets surgreffage en milieu paysan CI-FIRCA-157585-NC-RFB / Recrutement d'une agence 4. Program coordination, de communication pour la Single Stage - One 2020-03- 2020-03- 2020-05- 2020-05- 2020-07- 2021-01- IBRD / 88450 monitoring and knowledge Post Request for Bids Open - National 131,000.00 0.00 Canceled mise en œuvre de la Envelope 15 20 01 31 05 01 management communication institutionnelle du PPCA CI-FIRCA-157596-NC-RFQ / Sélection d'un agence de 4. Program coordination, Request for Single Stage - One 2020-03- 2020-05- 2020-11- communication pour la IBRD / 88450 monitoring and knowledge Post Limited 65,000.00 0.00 Canceled Quotations Envelope 28 23 19 conception et production de management supports de sensibilisation CI-FIRCA-203491-NC-RFQ / Sélection d'un prestataire en communication 4. Program coordination, Pending évènemetielle pour Request for Single Stage - One 2020-12- 2021-01- 2021-07- IBRD / 88450 monitoring and knowledge Post Limited 80,000.00 0.00 Implement l'organisation des Quotations Envelope 06 31 30 management ation cérémonies de lancement et d'inauguration d'infrastructures et autres manifestations CI-FIRCA-203493-NC-RFQ 4. Program coordination, Pending / Installation d’Internet par Request for Single Stage - One 2020-12- 2021-01- 2021-07- IBRD / 88450 monitoring and knowledge Post Limited 65,000.00 0.00 Implement BLR (Boucle Locale Radio) au Quotations Envelope 05 30 29 management ation CITA avec 1 an d’abonnement CI-FIRCA-203502-NC-RFQ 4. Program coordination, Pending / Installation d’Internet par Request for Single Stage - One 2020-12- 2021-01- 2021-07- IBRD / 88450 monitoring and knowledge Post Limited 10,000.00 0.00 Implement Fibre optioque (FO° à Quotations Envelope 05 30 29 management ation l’annexe 1 du CCA Vallon CI-FIRCA-76397-NC-DIR / 4. Program coordination, Pending 2021-01- 2021-01- 2021-03- 2021-08- Entretien et réparation des IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 60,000.00 0.00 Implement 20 25 01 28 véhicules management ation CI-PPCA-225097-NC-RFQ 4. Program coordination, Pending / Recruter un prestataire Request for Single Stage - One 2021-06- 2021-07- 2022-01- IBRD / 88450 monitoring and knowledge Post Limited 28,000.00 0.00 Implement pour la maintenance Quotations Envelope 05 31 27 management ation préventive des équipements PPCA CI-PPCA-225100-NC-RFQ 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-06- 2021-12- / Recruter un prestataire IBRD / 88450 monitoring and knowledge Post Limited 9,000.00 0.00 Implement Quotations Envelope 05 30 27 transport de plis management ation CI-PPCA-225101-NC-RFQ 4. Program coordination, Pending Request for Single Stage - One 2021-08- 2021-09- 2022-03- / Recruter un prestataire IBRD / 88450 monitoring and knowledge Post Limited 28,000.00 0.00 Implement Quotations Envelope 04 29 28 Gardiennage bureau management ation CI-PPCA-225102-NC-RFQ / Recruter un prestataire 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-06- 2021-12- pour l’entretien des IBRD / 88450 monitoring and knowledge Post Limited 14,000.00 0.00 Implement Quotations Envelope 05 30 27 installations électriques, management ation climatiseurs, sanitaires et plomberies CI-PPCA-225103-NC-RFQ 4. Program coordination, Pending / Recruter un prestataire Request for Single Stage - One 2021-05- 2021-06- 2021-12- IBRD / 88450 monitoring and knowledge Post Limited 37,000.00 0.00 Implement pour autres entretiens et Quotations Envelope 04 29 26 management ation réparations (Nettoyage ) CI-PPCA-225104-NC-RFQ / Recruter un prestataire 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-07- 2021-12- pour l’assurance maladie et IBRD / 88450 monitoring and knowledge Post Limited 75,000.00 0.00 Implement Quotations Envelope 08 03 30 Individuel accident (maladie management ation et accident) CI-PPCA-225106-NC-RFQ 4. Program coordination, Pending / l’assurance multirisque Request for Single Stage - One 2021-05- 2021-07- 2021-12- IBRD / 88450 monitoring and knowledge Post Limited 3,000.00 0.00 Implement professionnelle (Assurance Quotations Envelope 08 03 30 management ation du bâtiment) CI-PPCA-225108-NC-RFQ 4. Program coordination, Pending / Recruter un prestataire en Request for Single Stage - One 2021-05- 2021-07- 2021-12- IBRD / 88450 monitoring and knowledge Post Limited 7,000.00 0.00 Implement vue de la production du Quotations Envelope 09 04 31 management ation premier numéro du magazine du PPCA CI-PPCA-225110-NC-RFQ / Recruter un prestataire en 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-07- 2022-01- vue de la réalisation d'un IBRD / 88450 monitoring and knowledge Post Limited 28,000.00 0.00 Implement Quotations Envelope 25 20 16 film documentaire sur les management ation résultats du projet CI-PPCA-225111-NC-RFQ / Recruter un prestataire en 4. Program coordination, Pending Request for Single Stage - One 2021-05- 2021-07- 2022-01- vue de l’édition de carte des IBRD / 88450 monitoring and knowledge Post Limited 19,000.00 0.00 Implement Quotations Envelope 25 20 16 interventions du projet management ation format A0 CI-PPCA-225112-NC-RFQ / Recruter un prestataire en 4. Program coordination, Pending vue de la production et de Request for Single Stage - One 2021-05- 2021-07- 2022-01- IBRD / 88450 monitoring and knowledge Post Limited 19,000.00 0.00 Implement l’installation de panneaux et Quotations Envelope 25 20 16 management ation pancartes signalétiques GRIN et autres réalisations etc., CI-PPCA-225114-NC-RFQ 4. Program coordination, Pending / Recruter un prestataire en Request for Single Stage - One 2021-05- 2021-07- 2022-01- IBRD / 88450 monitoring and knowledge Post Limited 9,310.00 0.00 Implement vue de la réalisation d'un Quotations Envelope 25 20 16 management ation branding des locaux du PPCA CI-PPCA-225120-NC-RFQ / Recruter un prestataire en 4. Program coordination, Pending vue de la production de Request for Single Stage - One 2021-05- 2021-07- 2022-01- IBRD / 88450 monitoring and knowledge Post Limited 79,490.00 0.00 Implement supports de sensibilisation Quotations Envelope 25 20 16 management ation (IEC) Affiche illustrés (SCP, MGP ; GBF, GBH, VBG, PGP...) CI-PPCA-225613-NC-RFQ 2. Productivity / Sélection d’un prestataire Pending enhancement and Request for Single Stage - One 2021-07- 2021-08- 2022-02- pour assurer la maintenance IBRD / 88450 Post Limited 19,000.00 0.00 Implement improved access to Quotations Envelope 05 30 26 préventive des équipements ation markets de la DOPA CI-PPCA-225617-NC-RFB / Acquérir les plants 2. Productivity Pending forestiers et réaliser le enhancement and Single Stage - One 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2022-04- IBRD / 88450 Post Request for Bids Open - National 225,000.00 0.00 Implement reboisement de 200 ha improved access to Envelope 30 05 16 15 20 18 ation dans le cadre du markets programme de reboisement compensatoire CI-PPCA-225627-NC-RFQ / Location de camion 4. Program coordination, Pending Request for Single Stage - One 2021-06- 2021-08- 2022-02- podium pour la promotion IBRD / 88450 monitoring and knowledge Post Limited 67,000.00 0.00 Implement Quotations Envelope 28 23 19 itinérante de la management ation consommation locale du cajou CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual CI-FIRCA-70966-CS-QBS / Recrutement d'un consultant individuel pour 3. Support to private le constat d'impact investment in post-harvest Quality Based Open - 2018-05- 2018-02- 2018-05- 2018-07- 2018-07- 2018-06- 2018-08- 2018-06- 2018-09- 2018-06- 2018-11- 2018-08- 2019-11- IBRD / 88450 Post 100,000.00 63,970.24 Signed environnemental et social ( and processing Selection International 03 01 24 07 30 06 29 26 28 20 02 13 02 CIES) de travaux de 184 km infrastructure de routes rurales dans les régions du GBEKE, HAMBOL et GONTOUGOU CI-FIRCA-71186-CS-QBS / Recrutement d'un 2. Productivity consultant pour enhancement and Quality Based 2015-04- 2018-04- 2015-05- 2015-06- 2018-06- 2015-07- 2018-07- 2015-08- 2018-07- 2015-09- 2018-07- 2015-10- 2018-08- 2016-10- 2018-12- IBRD / 88450 Post Open - National 50,000.00 57,817.90 Completed l'actualisation de la improved access to Selection 16 02 07 20 13 18 04 17 04 16 18 21 17 20 24 structure des prix de la markets commercialisation de la noix brute de cajou en Côte d'Ivoire CI-FIRCA-70226-CS-QBS / Recrutement d'un 3. Support to private consultant pour l'Étude de investment in post-harvest Quality Based Open - 2017-06- 2018-03- 2018-03- 2018-04- 2018-03- 2018-05- 2018-04- 2018-05- 2018-04- 2018-05- 2018-07- 2018-08- 2019-07- IBRD / 88450 Post 250,000.00 243,625.86 Signed l'évaluation and processing Selection International 29 07 07 17 19 31 12 31 17 31 04 13 04 Environnementale et infrastructure Stratégique de la Zone Industrielle de SEGUELA CI-FIRCA-74797-CS-QCBS / Recrutement de cabinets 4. Program coordination, pour les audits annuels Quality And Cost- Open - 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2020-04- IBRD / 88450 monitoring and knowledge Post 240,000.00 0.00 Canceled (financiers de l'agence Based Selection International 11 01 15 12 11 18 22 21 management fiduciaire et des agences d'exécution (sur les 3 premières années) du projet CI-FIRCA-74808-CS-CQS / Recrutement de Cabinet 3. Support to private pour l'assistance technique Consultant investment in post-harvest Open - Pending 2019-01- 2019-01- 2019-03- 2019-04- 2019-05- 2019-11- pour la conception et le IBRD / 88450 Post Qualification 50,000.00 0.00 and processing International Implementation 04 25 10 09 14 10 développement de plans Selection infrastructure d'affaires au profit des gestionnaires d'entrepôts CI-FIRCA-74843-CS-CQS / Recrutement de cabinets 3. Support to private Consultant pour la réalisation d'une investment in post-harvest Open - Pending 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-09- IBRD / 88450 Post Qualification 180,000.00 0.00 étude de faisabilité and processing International Implementation 12 03 16 15 22 18 Selection technique et financière des infrastructure plateformes de service CI-FIRCA-70381-CS-QBS / Recrutement d'un 3. Support to private consultant pour les Études investment in post-harvest Quality Based Open - Pending 2017-06- 2018-03- 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2019-07- IBRD / 88450 Post 250,000.00 0.00 d'Évaluation and processing Selection International Implementation 29 31 31 26 26 26 17 17 Environnementales et infrastructure Sociales Stratégiques (EEES) de la zone industrielle de . CI-FIRCA-70952-CS-QCBS / Recrutement d"un 3. Support to private consultant pour l'évaluation investment in post-harvest Quality And Cost- Open - 2017-06- 2018-04- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2019-08- IBRD / 88450 Post 250,000.00 0.00 Canceled environnementale et sociale and processing Based Selection International 29 02 17 07 13 19 23 23 23 stratégique ( EEES) de la infrastructure zone agro industrielle de BOUAKE CI-FIRCA-77817-CS-QBS / Recrutement d'un 3. Support to private consultant pour la investment in post-harvest Quality Based Open - 2017-06- 2018-05- 2018-06- 2018-03- 2018-07- 2018-04- 2018-08- 2018-09- 2018-06- 2018-10- 2018-08- 2019-10- 2019-04- IBRD / 88450 Post 250,000.00 267,037.19 Completed réalisation des études and processing Selection International 29 17 21 26 19 12 18 17 12 22 13 22 02 environnementale et sociale infrastructure stratégique (EESS) de la zone agro industrielle de KORHOGO CI-FIRCA-78373-CS-QBS / Recrutement d'un cabinet 4. Program coordination, Quality Based 2018-10- 2019-09- 2018-10- 2019-12- 2018-12- 2020-03- 2019-01- 2020-05- 2019-02- 2020-05- 2019-03- 2020-06- 2019-04- 2020-07- 2020-04- pour le diagnostique et IBRD / 88450 monitoring and knowledge Post Open - National 30,000.00 86,707.62 Signed Selection 05 30 26 31 09 04 06 05 05 05 07 09 11 08 10 proposition de plan management stratégique du Système Informatique du CCA CI-FIRCA-82252-CS-INDV 4. Program coordination, Quality And Cost- Open - 2018-10- 2018-11- 2019-01- 2019-01- 2019-03- 2019-04- 2019-05- 2020-05- / Recrutement d'un cabinet IBRD / 88450 monitoring and knowledge Post 100.00 0.00 Canceled Based Selection International 30 20 03 31 02 06 11 10 pour l'étude de référence du management projet CI-FIRCA-82277-CS-QCBS / Recrutement de cabinets 4. Program coordination, pour les audits Quality And Cost- Open - 2018-10- 2019-01- 2018-11- 2018-12- 2019-02- 2019-01- 2019-02- 2019-02- 2019-02- 2019-04- 2019-03- 2019-05- 2015-05- 2020-05- IBRD / 88450 monitoring and knowledge Post 240,000.00 62,110.45 Signed annuels(financiers de Based Selection International 26 10 16 30 15 27 18 26 26 02 21 07 15 06 management l'agence fiduciaire et des agences d'éxécution(sur les 3 premières années) du projet CI-FIRCA-82335-CS-CQS / 2. Productivity Sélection d'un cabinet pour Consultant enhancement and Open - 2018-10- 2018-12- 2018-11- 2019-01- 2019-04- 2019-02- 2019-06- 2019-03- 2019-07- 2019-09- 2019-12- pour l'étude de faisabilité IBRD / 88450 Post Qualification 43,000.00 52,515.17 Completed improved access to International 30 09 20 03 11 02 07 09 04 05 16 de l'e-extension dans la Selection markets filière Anacarde CI-FIRCA-82454-CS-CQS / Sélectionner un cabinet 2. Productivity Consultant pour réaliser l'étude de enhancement and Open - 2018-10- 2018-12- 2018-11- 2019-01- 2019-03- 2019-02- 2019-06- 2019-03- 2019-07- 2019-09- IBRD / 88450 Post Qualification 43,000.00 127,208.83 Signed faisabilité d'un programme improved access to International 31 09 21 04 29 03 03 10 02 06 Selection des Opérateurs markets Professionnels du Cajou (OPCA) CI-FIRCA-82462-CS-CQS / 2. Productivity Sélectionner un cabinet Consultant enhancement and Open - Pending 2018-11- 2018-12- 2019-02- 2019-03- 2019-04- 2019-10- pour réaliser les missions IBRD / 88450 Post Qualification 86,000.00 0.00 improved access to International Implementation 29 20 02 04 08 05 de suivi des activités du Selection markets conseil agricole dédié par un Cabinet CI-FIRCA-82478-CS-CQS / Sélectionner un cabinet 2. Productivity Consultant pour réaliser l'étude de enhancement and Open - Pending 2018-10- 2018-11- 2019-01- 2019-02- 2019-03- 2019-09- IBRD / 88450 Post Qualification 69,000.00 0.00 mécanisation des activités improved access to International Implementation 31 21 04 03 10 06 Selection de ramassage de la récolte markets de l'anacarde en Côte d'ivoire CI-FIRCA-82484-CS-CQS / 2. Productivity Sélectionner un cabinet Consultant enhancement and Open - 2018-10- 2019-09- 2018-11- 2019-01- 2019-11- 2019-02- 2019-03- 2019-12- 2019-09- pour réaliser l'étude IBRD / 88450 Post Qualification 34,000.00 66,227.70 Signed improved access to International 31 02 21 04 11 03 10 13 06 technique de sécurisation Selection markets des sites du PAVA CI-FIRCA-82487-CS-CQS / 2. Productivity Sélection d'un cabinet pour Consultant enhancement and Open - Pending 2018-10- 2018-11- 2019-01- 2019-02- 2019-03- 2019-09- l'étude d'impact du conseil IBRD / 88450 Post Qualification 45,000.00 0.00 improved access to International Implementation 31 21 04 03 10 06 agricole dédié sur les Selection markets producteurs agricoles CI-FIRCA-105971-CS- 3. Support to private QCBS / Sélection d'un investment in post-harvest Quality And Cost- Open - 2019-06- 2019-07- 2019-07- 2019-09- 2019-09- 2019-10- 2019-12- 2020-01- 2021-01- cabinet pour réaliser l'EESS IBRD / 88450 Post 559,000.00 0.00 Under Review and processing Based Selection International 28 19 19 01 29 29 03 07 06 de la zone agro-industrielle infrastructure de Yamousssoukro CI-FIRCA-105978-CS- 3. Support to private QCBS / Sélection d'un investment in post-harvest Quality And Cost- Open - 2019-03- 2019-02- 2019-04- 2019-05- 2019-04- 2019-06- 2019-04- 2019-07- 2019-04- 2019-08- 2019-05- 2019-09- 2019-06- 2020-09- IBRD / 88450 Post 47,000.00 65,763.25 Signed consultant pour réaliser le and processing Based Selection International 13 27 03 17 23 14 23 14 23 18 29 22 25 21 CIES de Bondoukou infrastructure CI-FIRCA-106186-CS-CQS 1. Institutional Consultant / Sélection d'un cabinet 2019-03- 2019-07- 2019-03- 2019-07- 2019-04- 2019-08- 2019-06- 2019-09- 2019-11- IBRD / 88450 strengthening and value Post Qualification Limited 38,000.00 23,945.90 Signed pour réaliser l'audit 15 24 29 29 28 27 02 19 29 chain governance Selection technique des ouvrages du CITA CI-FIRCA-106445-CS-CQS / Recruter un cabinet pour la sensibilisation et la formation des acteurs 3. Support to private Consultant (ONG& Association) et des investment in post-harvest 2019-05- 2019-12- 2019-05- 2019-07- 2019-08- 2019-09- 2020-03- IBRD / 88450 Post Qualification Open - National 37,000.00 0.00 Canceled membres des commissions and processing 03 03 24 07 06 10 08 Selection d'évaluation et de purge des infrastructure droits coutumiers sur les différentes étapes de la réinstallation à Korhogo Page 6 CI-FIRCA-106449-CS- 3. Support to private QCBS / Sélection d'un investment in post-harvest Quality And Cost- 2019-05- 2019-07- 2019-06- 2019-12- 2019-08- 2020-03- 2019-08- 2020-04- 2019-09- 2020-04- 2019-11- 2020-05- 2019-12- 2020-10- 2020-12- IBRD / 88450 Post Open - National 837,000.00 740,085.45 Signed consultant pour Suivre les and processing Based Selection 30 26 20 12 03 03 31 02 30 14 04 14 09 09 08 travaux de la plateforme de infrastructure Korhogo CI-FIRCA-106458-CS-CQS 3. Support to private / Sélection de deux cabinet Consultant investment in post-harvest 2019-07- 2019-07- 2019-09- 2019-10- 2019-11- 2020-05- pour réaliser les études IBRD / 88450 Post Qualification Open - National 186,000.00 0.00 Canceled and processing 01 22 04 04 08 06 techniques de réhabilitation Selection infrastructure et de construction CI-FIRCA-106578-CS-CQS 2. Productivity / Sélection d'un cabinet Consultant enhancement and Under 2019-03- 2019-05- 2019-04- 2019-05- 2019-06- 2019-12- pour réaliser une étude sur IBRD / 88450 Post Qualification Limited 112,000.00 0.00 improved access to Implementation 31 29 14 14 18 15 le compte d'exploitation Selection markets des producteurs d'anacarde. CI-FIRCA-106593-CS- 2. Productivity QCBS / Sélection d'un enhancement and Quality And Cost- Open - Under 2019-03- 2019-11- 2019-04- 2019-06- 2020-01- 2019-07- 2020-01- 2019-08- 2019-09- 2019-10- 2020-10- IBRD / 88450 Post 316,000.00 0.00 consultant pour réaliser les improved access to Based Selection International Implementation 31 08 21 04 17 02 17 01 05 10 09 études de CIES /EIES des markets CDC . CI-FIRCA-106616-CS-CQS 2. Productivity Consultant / Sélection d'un consultant enhancement and 2019-03- 2019-09- 2019-04- 2019-10- 2019-05- 2019-11- 2019-06- 2019-12- 2019-12- IBRD / 88450 Post Qualification Limited 60,000.00 66,212.21 Signed pour réaliser les études improved access to 29 17 12 30 12 18 16 13 13 Selection techniques des sites de markets CDC. CI-FIRCA-106622-CS-CQS / Sélection d'un cabinet 2. Productivity Consultant pour réaliser deux missions enhancement and 2019-03- 2019-05- 2019-04- 2019-06- 2019-05- 2019-06- 2019-06- 2019-07- 2019-12- IBRD / 88450 Post Qualification Limited 80,000.00 82,836.36 Signed de suivi et d'évaluation des improved access to 29 07 12 03 12 25 16 11 13 Selection activité du Conseil Agricole markets dédié a l'Anacarde ( CAA). CI-FIRCA-106632-CS-CQS / Sélection d'un consultant pour faire le contrôle de 2. Productivity Consultant l'exécution des travaux de enhancement and Open - Pending 2019-03- 2019-04- 2019-05- 2019-06- 2019-07- 2020-01- IBRD / 88450 Post Qualification 261,000.00 0.00 réhabilitation et improved access to International Implementation 18 08 22 21 26 22 Selection construction et 146.04 Km markets de routes rurales ( Régions du GBEKE et du HAMBOL) . CI-FIRCA-106638-CS-CQS / Sélection d'un consultant pour faire le contrôle de 2. Productivity Consultant l'exécution des travaux de enhancement and Open - Pending 2019-03- 2019-04- 2019-05- 2019-06- 2019-07- 2020-01- IBRD / 88450 Post Qualification 261,000.00 0.00 réhabilitation et improved access to International Implementation 18 08 22 21 26 22 Selection construction de 116.90 Km markets de routes rurales (Région du GONTOUGO). CI-FIRCA-106644-CS-CQS 2. Productivity / Sélection d'un consultant Consultant enhancement and 2019-06- 2019-07- 2019-08- 2019-09- 2020-03- pour réaliser les études EIES IBRD / 88450 Post Qualification Limited 187,000.00 0.00 Canceled improved access to 28 12 11 15 13 /CIES des 448 Km à Selection markets réhabiliter et a construire. CI-FIRCA-106670-CS-CQS 2. Productivity / Sélection d'un consultant Consultant enhancement and Open - Pending 2019-03- 2019-04- 2019-05- 2019-06- 2019-07- 2020-01- pour réaliser les études IBRD / 88450 Post Qualification 243,000.00 0.00 improved access to International Implementation 18 08 22 21 26 22 techniques détaillées des Selection markets 448Km à réhabiliter et à construire. CI-FIRCA-106675-CS-CQS / sélection d'un consultant 2. Productivity Consultant pour faire le contrôle de enhancement and Open - Pending 2019-03- 2019-04- 2019-05- 2019-06- 2019-08- 2020-01- IBRD / 88450 Post Qualification 279,000.00 0.00 l'exécution des travaux de improved access to International Implementation 27 17 31 30 04 31 Selection réhabilitation de 448 Km markets (Mission 1 Gontougo ) CI-FIRCA-106678-CS-CQS / sélection d'un consultant 2. Productivity Consultant pour faire le contrôle de enhancement and Open - Pending 2019-09- 2019-10- 2019-11- 2019-12- 2020-01- 2020-07- IBRD / 88450 Post Qualification 279,000.00 0.00 l'exécution des travaux de improved access to International Implementation 16 07 20 20 24 22 Selection réhabilitation de 448 Km markets (Mission 1 Gontougo ) CI-FIRCA-106679-CS-CQS 2. Productivity / sélection d'un consultant Consultant enhancement and Open - Pending 2019-09- 2019-10- 2019-11- 2019-12- 2020-01- 2020-07- pour faire le contrôle de IBRD / 88450 Post Qualification 279,000.00 0.00 improved access to International Implementation 16 07 20 20 24 22 l'exécution des travaux de Selection markets réhabilitation de 448 Km (Mission2 hambol) CI-FIRCA-106701-CS-CQS 2. Productivity / Sélection d'un cabinet Consultant enhancement and Open - Pending 2019-09- 2019-10- 2019-11- 2019-12- 2020-01- 2020-07- pour faire le contrôle de IBRD / 88450 Post Qualification 186,000.00 0.00 improved access to International Implementation 16 07 20 20 24 22 l'exécution des travaux de Selection markets réhabilitation de 448Km (mission 3 GBEkE) CI-FIRCA-106869-CS-CQS / Recrutement d'un cabinet 1. Institutional Consultant Open - 2019-03- 2019-12- 2019-04- 2019-12- 2019-06- 2019-07- 2019-08- 2020-02- pour la viabilité technique IBRD / 88450 strengthening and value Post Qualification 112,000.00 0.00 Canceled International 30 10 20 17 03 03 07 03 et financière des 29 chain governance Selection sociétés coopératives. CI-FIRCA-107746-CS- QCBS / Recrutement d'une Firme de consultants chargé 1. Institutional Quality And Cost- Under 2019-03- 2019-07- 2019-04- 2019-05- 2020-02- 2019-06- 2019-07- 2019-08- 2019-10- 2020-10- de la mise en place et de IBRD / 88450 strengthening and value Post Open - National 250,000.00 0.00 Based Selection Implementation 25 07 15 29 28 26 26 30 04 03 l'opérationnalisation de la chain governance fonction d'audit interne au sein du CCA CI-FIRCA-107777-CS- 3. Support to private QCBS / Sélection d'un investment in post-harvest Quality And Cost- Pending 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2019-09- 2019-10- 2020-10- IBRD / 88450 Post Open - National 100,000.00 0.00 consultant pour définir le and processing Based Selection Implementation 15 06 19 17 16 20 25 24 mode de gestion des sites infrastructure CI-FIRCA-126663-CS-CQS 2. Productivity Consultant / Sélection d'un consultant enhancement and Pending 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- IBRD / 88450 Post Qualification Limited 28,000.00 0.00 pour réaliser les études improved access to Implementation 30 13 13 17 15 Selection techniques du sites CDC de markets Badikaha CI-FIRCA-126677-CS-CQS / Sélection d'un cabinet 2. Productivity pour la réalisation de deux Consultant enhancement and Pending 2019-08- 2019-08- 2019-09- 2019-11- 2020-04- missions de suivi des IBRD / 88450 Post Qualification Limited 92,000.00 0.00 improved access to Implementation 15 29 28 02 30 prestations du conseil Selection markets agricole dédié aux producteurs d'anacarde au titre de la campagne 2019. CI-FIRCA-126682-CS-CQS 2. Productivity / Sélection de consultants Consultant enhancement and 2019-09- 2021-04- 2019-09- 2019-12- 2019-10- 2020-03- 2019-12- 2020-03- 2020-05- pour Réaliser les études IBRD / 88450 Post Qualification Limited 47,000.00 58,570.42 Signed improved access to 15 02 29 20 29 13 03 30 31 EIES/CIES des 448 Km à Selection markets réhabiliter et à construire Mission 3 GBEKE) CI-FIRCA-126694-CS-CQS 1. Institutional Consultant / Recrutement d’un cabinet Under 2019-09- 2019-11- 2019-09- 2019-12- 2019-11- 2019-12- 2020-01- 2020-07- IBRD / 88450 strengthening and value Post Qualification Open - National 187,000.00 0.00 pour l’élaboration du code Implementation 01 25 22 31 05 05 09 07 chain governance Selection de l’environnement CI-FIRCA-126714-CS-CQS / Sélection de consultants 2. Productivity Consultant pour Réaliser les études enhancement and 2019-09- 2019-12- 2019-09- 2019-12- 2019-10- 2020-03- 2019-12- 2020-03- 2020-06- IBRD / 88450 Post Qualification Limited 70,000.00 60,832.53 Signed EIES/CIES des 448 Km à improved access to 16 09 30 19 30 13 04 30 01 Selection réhabiliter et à construire ( markets Mission 1Gountougo) CI-FIRCA-126717-CS-CQS / Sélection de consultants 2. Productivity Consultant pour Réaliser les études enhancement and 2019-09- 2021-04- 2019-09- 2019-12- 2019-10- 2020-03- 2019-12- 2020-03- 2020-06- IBRD / 88450 Post Qualification Limited 70,000.00 44,849.15 Signed EIES/CIES des 448 Km à improved access to 16 02 30 18 30 13 04 30 01 Selection réhabiliter et à construire markets ((Mission 2 Hambol) CI-FIRCA-126950-CS-CQS 2. Productivity / Sélection d'un consultant Consultant enhancement and 2019-08- 2018-05- 2019-09- 2019-10- 2018-06- 2019-11- 2019-12- 2018-08- 2020-06- chargé de l'EIES de 18 km IBRD / 88450 Post Qualification Open - National 100,000.00 35,127.38 Signed improved access to 12 09 02 16 26 15 20 13 17 de routes rurales de la Selection markets région du Hambol et Gontougo CI-FIRCA-140407-CS-CQS 4. Program coordination, Consultant / Réalisation de la situation 2019-10- 2019-05- 2019-10- 2019-05- 2019-11- 2019-08- 2020-01- 2019-08- 2020-06- IBRD / 88450 monitoring and knowledge Post Qualification Limited 320,000.00 286,441.03 Signed de référence et du suivi de 15 10 29 27 28 06 02 06 30 management Selection l'impact du PPCA CI-FIRCA-106198-CS-CQS / Sélection d'un cabinet pour la formation sur les différentes étapes du 1. Institutional Consultant 2019-03- 2019-04- 2019-05- 2019-06- 2019-07- 2020-01- processus de IBRD / 88450 strengthening and value Post Qualification Open - National 93,000.00 0.00 Canceled 15 05 19 18 23 19 transformation de la noix chain governance Selection de cajou désagrégées selon la qualification (technicien,superviseurs ,managers /gestions ) CI-FIRCA-74830-CS-CQS / Recrutement d'un cabinet 1. Institutional Consultant pour l'étude de référence de Open - 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-08- IBRD / 88450 strengthening and value Post Qualification 50,000.00 0.00 Canceled satisfaction des acteurs sur International 15 05 19 18 22 21 chain governance Selection les mesures prises par le Gouvernement CI-FIRCA-106450-CS- 3. Support to private QCBS / Sélection d'un investment in post-harvest Quality And Cost- 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2019-12- 2020-01- 2021-01- IBRD / 88450 Post Open - National 502,000.00 0.00 Canceled consultant pour Suivre les and processing Based Selection 15 05 18 16 15 20 24 23 travaux de la plateforme de infrastructure Bondoukou CI-FIRCA-82236-CS-QBS / Recrutement d'un Cabinet pour la mission de contrôle 2. Productivity technique du second enhancement and Quality Based 2019-04- 2019-04- 2019-06- 2019-07- 2019-08- 2019-09- 2019-10- 2020-10- programme de travaux de IBRD / 88450 Post Open - National 240,000.00 0.00 Canceled improved access to Selection 01 22 05 03 02 01 06 05 réhabilitation par RC et markets RLTPC de 125 km de routes rurales dans les Régions du Gbèkè et du Hambol (Mission II.1) CI-FIRCA-82307-CS-QBS / Recruter un cabinet pour 3. Support to private réaliser des études investment in post-harvest Quality Based 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2020-05- IBRD / 88450 Post Open - National 28,000.00 0.00 Canceled techniques et de and processing Selection 15 06 19 16 18 17 22 21 sauvegarde infrastructure environnementale et sociale des sites des CDC CI-FIRCA-82246-CS-QBS / Recrutement d'un Cabinet pour la mission de contrôle 2. Productivity technique du second enhancement and Quality Based 2019-04- 2019-04- 2019-06- 2019-07- 2019-08- 2019-09- 2019-10- 2020-10- programme de travaux de IBRD / 88450 Post Open - National 240,000.00 0.00 Canceled improved access to Selection 01 22 05 03 02 01 06 05 réhabilitation par RC et markets RLTPC de 125 km de routes rurales dans les Régions du Gontougo et du Hambol (Mission II.2) CI-FIRCA-82234-CS-QBS / Recrutement d'un Cabinet 2. Productivity pour le contrôle technique enhancement and Quality Based 2018-10- 2018-11- 2019-01- 2019-01- 2019-03- 2019-04- 2019-05- 2020-05- des Travaux de IBRD / 88450 Post Open - National 280,000.00 0.00 Canceled improved access to Selection 30 20 03 31 02 01 06 05 réhabilitation par RLTPC de markets 170 km dans la Région du Gontougo (Mission I.3) CI-FIRCA-82248-CS-QBS / Recrutement d'un Cabinet pour la mission de contrôle 2. Productivity technique des travaux enhancement and Quality Based 2019-12- 2019-12- 2020-02- 2020-03- 2020-04- 2020-05- 2020-06- 2021-06- IBRD / 88450 Post Open - National 100,000.00 0.00 Canceled d'entretien par RLEP du 1er improved access to Selection 02 23 05 04 03 03 07 07 programme de 428 markets (258+170) km de routes rurales réhabilités CI-FIRCA-74812-CS-QBS / 3. Support to private Recrutement de consultants investment in post-harvest Quality Based 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2020-04- pour le contrôle des travaux IBRD / 88450 Post Open - National 100,000.00 0.00 Canceled and processing Selection 15 05 19 16 15 17 21 20 de réhabilitation des infrastructure entrepôts de stockage CI-FIRCA-70158-CS-QBS / Recrutement d'un 3. Support to private consultant pour l 'évaluation investment in post-harvest Quality Based Open - 2017-06- 2018-03- 2018-03- 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2019-07- IBRD / 88450 Post 250,000.00 0.00 Canceled environnementale et sociale and processing Selection International 29 12 31 14 14 29 20 25 25 stratégique (EEES) de la infrastructure zone industrielle de KORHOGO. CI-FIRCA-82265-CS-QCBS 3. Support to private / Recrutement d'un cabinet investment in post-harvest Quality And Cost- Open - 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2019-09- 2019-10- 2020-10- pour l'accompagnement à la IBRD / 88450 Post 310,000.00 0.00 Canceled and processing Based Selection International 15 06 19 17 16 20 25 24 certification BPF et HACCP infrastructure pour les transformateurs CI-FIRCA-74788-CS-QCBS / Recrutement d'un bureau 3. Support to private d'études pour le suivi et le investment in post-harvest Quality And Cost- Open - 2019-02- 2019-02- 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2020-08- IBRD / 88450 Post 660,000.00 0.00 Canceled contrôle des travaux and processing Based Selection International 01 22 07 05 04 09 13 12 d'aménagement de la zone infrastructure industrielle de Bouaké CI-FIRCA-74781-CS-QCBS 2. Productivity / Recrutement de enhancement and Quality And Cost- Open - 2019-01- 2019-01- 2019-03- 2019-04- 2019-05- 2019-06- 2019-07- 2020-07- prestataires pour la collecte IBRD / 88450 Post 350,000.00 0.00 Canceled improved access to Based Selection International 03 24 09 06 06 10 15 14 des données nécessaires markets pour alimenter le SIG CI-FIRCA-157329-CS-QBS / Recrutement d'un 2. Productivity consultant pour la enhancement and Quality Based 2020-02- 2020-03- 2020-03- 2020-05- 2020-04- 2020-05- 2020-04- 2020-06- 2020-04- 2020-07- 2020-04- 2020-09- 2020-04- 2021-09- réalisation d'une mission IBRD / 88450 Post Open - National 75,000.00 72,331.42 Signed improved access to Selection 26 03 18 01 15 29 06 28 08 28 20 01 21 01 d'évaluation des parcs à markets bois des pépiniéristes privées et d'une mission d'audit des pépinières privées CI-FIRCA-126687-CS- QCBS / Recrutement d’une 3. Support to private Entreprise Spécialisée pour investment in post-harvest Quality And Cost- 2019-10- 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2020-04- 2021-04- la conception, la réalisation IBRD / 88450 Post Open - National 150,000.00 0.00 Canceled and processing Based Selection 15 05 19 16 15 21 25 25 et la gestion du centre de infrastructure valorisation des déchets sur la ZAI de Korhogo CI-FIRCA-106116-CS- 3. Support to private QCBS / Recruter un investment in post-harvest Quality And Cost- Open - 2019-12- 2020-01- 2020-03- 2020-03- 2020-04- 2020-06- 2020-07- 2021-07- IBRD / 88450 Post 60,000.00 0.00 Canceled consultant pour la and processing Based Selection International 27 17 01 29 28 02 07 07 réalisation des EIES/CIES de infrastructure Bouaké CI-FIRCA-106106-CS- 3. Support to private QCBS / Sélection d'un investment in post-harvest Quality And Cost- Open - 2019-05- 2019-05- 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-11- IBRD / 88450 Post 47,000.00 0.00 Canceled consultant pour réaliser and processing Based Selection International 02 23 06 03 02 07 11 10 l'EIES/CIES de Séguéla infrastructure CI-FIRCA-157337-CS-CQS 2. Productivity Consultant / Recrutement d'un cabinet enhancement and Under 2020-02- 2020-07- 2020-03- 2020-10- 2020-04- 2020-05- 2020-11- IBRD / 88450 Post Qualification Limited 41,000.00 0.00 pour la formation des OPCA improved access to Implementation 25 10 10 26 09 14 10 Selection à la méthodologie GERME markets du BIT CI-FIRCA-157340-CS-CQS 2. Productivity / Recrutement d'un cabinet Consultant enhancement and Under 2020-02- 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- pour la formation des OPCA IBRD / 88450 Post Qualification Open - National 19,000.00 0.00 improved access to Implementation 10 30 02 15 15 19 16 aux opérations de greffage Selection markets et surgreffage CI-FIRCA-157371-CS-CQS 2. Productivity / Recruter un consultant Consultant enhancement and 2020-02- 2021-02- 2020-03- 2020-05- 2020-08- 2020-06- 2020-09- 2020-07- 2020-09- 2021-01- pour la réalisation du EIES IBRD / 88450 Post Qualification Open - National 75,000.00 42,742.59 Signed improved access to 29 25 21 04 19 03 21 08 28 04 de 75,90 km de routes Selection markets rurales dans la région du Hambol CI-FIRCA-74846-CS-CQS / 3. Support to private Recrutement d'un cabinet Consultant investment in post-harvest Open - 2018-10- 2018-11- 2018-12- 2019-01- 2019-03- 2019-08- pour l'élaboration du guide IBRD / 88450 Post Qualification 40,000.00 0.00 Canceled and processing International 24 14 28 27 03 30 de l'investisseur de Selection infrastructure l'industrie de cajou CI-FIRCA-157375-CS-QBS / Recrutement d'un 2. Productivity consultant pour faire le enhancement and Quality Based Pending 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2020-11- 2020-12- 2021-12- contrôle de l’exécution des IBRD / 88450 Post Open - National 219,000.00 0.00 improved access to Selection Implementation 08 29 12 09 09 08 13 13 travaux de réhabilitation et markets construction de 94,2 km de routes rurales (Région du GONTOUGO) Page 7 CI-FIRCA-157376-CS-CQS / Recrutement d'un consultant pour faire le 2. Productivity Consultant contrôle de l’exécution des enhancement and Pending 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2021-04- IBRD / 88450 Post Qualification Open - National 322,000.00 0.00 travaux de réhabilitation et improved access to Implementation 08 29 12 11 16 14 Selection construction de 159,4 km markets de routes rurales (Régions du GBEKE et du HAMBOL) CI-FIRCA-157549-CS-CQS 3. Support to private Consultant Under 2020-02- 2020-03- 2020-03- 2020-04- 2020-05- 2020-07- 2020-12- / Sélection d'un consultant IBRD / 88450 investment in post-harvest Post Qualification Open - National 47,000.00 0.00 Implementation 22 05 14 27 27 01 28 pour réaliser l'EIES/CIES de and processing Selection Séguéla infrastructure CI-FIRCA-157551-CS-CQS / Recrutement d'un cabinet pour réaliser le suivi et le 3. Support to private Consultant contrôle des travaux de investment in post-harvest Under 2020-07- 2020-03- 2020-07- 2020-09- 2020-10- 2020-11- 2021-05- IBRD / 88450 Post Qualification Open - National 221,000.00 0.00 construction du centre de and processing Implementation 01 09 22 04 04 08 07 Selection vie, du poste de police, infrastructure bureaux administratifs et du centre de secours (GSPM) de la ZAI de Korhogo CI-FIRCA-157554-CS-CQS / Recrutement d'un cabinet pour la conception et la 3. Support to private Consultant réalisation des études investment in post-harvest Under 2020-03- 2020-10- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- IBRD / 88450 Post Qualification Open - National 188,000.00 0.00 techniques des and processing Implementation 08 09 29 12 11 16 12 Selection équipements du centre de infrastructure vie, du poste de police, bureaux administratifs et du centre de secours (GSPM) CI-FIRCA-106902-CS- QCBS / Recrutement d'un cabinet pour la conception 3. Support to private et la réalisation des études investment in post-harvest Quality And Cost- 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2020-04- 2020-05- 2021-05- IBRD / 88450 Post Open - National 188,000.00 0.00 Canceled techniques des and processing Based Selection 15 06 19 16 17 21 26 26 équipements du centre de infrastructure vie, du poste de police, bureaux administratifs et du centre de secours (GSPM) CI-FIRCA-157759-CS-CQS / Recrutement d'un consultant (FIRME)pour faire 1. Institutional Consultant l'étude et la conception des 2020-03- 2020-03- 2020-03- 2020-05- 2020-08- 2020-06- 2020-09- 2020-07- 2020-10- 2021-01- IBRD / 88450 strengthening and value Post Qualification Open - National 65,000.00 92,723.50 Signed plans d'exécution des 02 27 23 06 25 05 25 10 09 06 chain governance Selection bâtiments abritant les DR du CCA (Bondoukou, Bouaké, Korhogo et Séguéla) CI-FIRCA-157769-CS-CQS / Recrutement d'un cabinet 1. Institutional Consultant 2020-03- 2020-06- 2020-03- 2020-07- 2020-05- 2020-08- 2020-06- 2020-08- 2020-07- 2020-09- 2021-01- pour l'évaluation externe du IBRD / 88450 strengthening and value Post Qualification Open - National 112,000.00 92,437.50 Signed 06 15 27 08 10 13 09 26 14 25 10 conseil agricole dédié aux chain governance Selection producteurs d'anacarde CI-FIRCA-106904-CS-CQS / Recrutement d'un 3. Support to private consultant pour la Consultant investment in post-harvest Pending 2020-02- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- modélisation en 3 IBRD / 88450 Post Qualification Open - National 19,000.00 0.00 and processing Implementation 28 20 03 02 07 03 Dimensions et la réalisation Selection infrastructure d'une vidéo de synthèse (film d'animation) de la plateforme agro industrielle de Korhogo CI-FIRCA-74787-CS-CQS / Recrutement d'un bureau 3. Support to private Consultant d'études pour le suivi et le investment in post-harvest 2019-02- 2019-02- 2019-04- 2019-05- 2019-06- 2019-12- IBRD / 88450 Post Qualification Open - National 1,100,000.00 0.00 Canceled contrôle des travaux and processing 01 22 07 07 11 08 Selection d'aménagement de la zone infrastructure industrielle de Korhogo CI-FIRCA-74789-CS-QCBS / Recrutement d'un bureau 3. Support to private d'études pour le suivi et le investment in post-harvest Quality And Cost- Open - Pending 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- 2020-08- 2020-09- 2021-09- IBRD / 88450 Post 600,000.00 0.00 contrôle des travaux and processing Based Selection International Implementation 02 23 06 03 03 07 11 11 d'aménagement de la zone infrastructure industrielle de Séguéla CI-FIRCA-126685-CS- QCBS / Recrutement d'un 3. Support to private bureau d'études pour le investment in post-harvest Quality And Cost- 2020-03- 2020-03- 2020-03- 2020-05- 2020-05- 2020-08- 2020-06- 2020-10- 2020-07- 2020-10- 2020-08- 2020-11- 2020-09- 2020-12- 2021-09- IBRD / 88450 Post Open - National 400,000.00 747,618.67 Signed suivi et le contrôle des and processing Based Selection 04 31 25 18 08 19 05 05 05 21 09 09 13 10 13 travaux d'aménagement de infrastructure la zone industrielle de Bondoukou CI-FIRCA-74811-CS-CQS / Recrutement d'un Cabinet pour le contrôle technique 2. Productivity Consultant des Travaux de enhancement and Open - 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-08- IBRD / 88450 Post Qualification 250,000.00 0.00 Canceled réhabilitation par RC et improved access to International 15 05 19 18 22 21 Selection RLTPC de 130 km dans la markets Région du Gbèkè et le Département de Niakara (Mission 1) CI-FIRCA-82311-CS-CQS / 1. Institutional Consultant Recrutement d'un bureau de Open - 2018-10- 2018-11- 2019-01- 2019-02- 2019-03- 2019-09- IBRD / 88450 strengthening and value Post Qualification 35,000.00 0.00 Canceled contrôle des travaux International 31 21 04 03 10 06 chain governance Selection d'aménagement de l'UGP CI-FIRCA-74833-CS-CQS / 1. Institutional Consultant Recrutement d'un Cabinet Open - 2018-09- 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- IBRD / 88450 strengthening and value Post Qualification 50,000.00 0.00 Canceled pour former les acteurs du International 18 09 22 22 26 25 chain governance Selection SRE (GE, IE, CPQ) CI-FIRCA-74831-CS-CQS / Recrutement d'un cabinet 1. Institutional Consultant pour former les institutions Open - 2018-09- 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- IBRD / 88450 strengthening and value Post Qualification 20,000.00 0.00 Canceled financières sur le SRE International 13 04 17 17 21 20 chain governance Selection (Banques, Assurances, autres acteurs financiers) CI-FIRCA-126730-CS-CQS 2. Productivity / Recruter un consultant Consultant enhancement and 2019-09- 2019-10- 2019-11- 2019-12- 2020-01- 2020-07- (firme) pour l'appui à IBRD / 88450 Post Qualification Open - National 47,000.00 0.00 Canceled improved access to 15 06 19 19 23 21 l'établissement des Selection markets certificats fonciers des sites du PAVA CI-FIRCA-126668-CS-CQS 2. Productivity / Sélection d'un cabinet Consultant enhancement and 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- pour réaliser les études IBRD / 88450 Post Qualification Limited 28,000.00 0.00 Canceled improved access to 30 13 13 17 15 techniques du site de CDC Selection markets de Koflandé (BOUNA) CI-FIRCA-82464-CS-CQS / 2. Productivity Sélectionner un cabinet Consultant enhancement and Open - 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-09- pour réaliser les missions IBRD / 88450 Post Qualification 86,000.00 0.00 Canceled improved access to International 15 06 19 18 25 21 de suivi des activités du Selection markets conseil agricole dédié CI-FIRCA-82466-CS-CQS / 2. Productivity Sélectionner un cabinet Consultant enhancement and Open - 2018-10- 2018-11- 2019-01- 2019-02- 2019-03- 2019-09- pour réaliser l'évaluation IBRD / 88450 Post Qualification 43,000.00 0.00 Canceled improved access to International 31 21 04 03 10 06 finale du projet de conseil Selection markets agricole dédié par un Cabinet CI-FIRCA-106448-CS-CQS / Recruter un cabinet pour la sensibilisation et la formation des acteurs 3. Support to private Consultant (ONG& Association) et des investment in post-harvest Pending 2020-04- 2020-05- 2020-06- 2020-07- 2020-08- 2021-02- IBRD / 88450 Post Qualification Open - National 37,000.00 0.00 membres des commissions and processing Implementation 20 11 24 24 28 24 Selection d'évaluation et de purge des infrastructure droits coutumiers sur les différentes étapes de la réinstallation à Bouaké CI-FIRCA-75272-CS-CQS / Recrutement d'un cabinet 1. Institutional Consultant 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-08- pour l'actualisation du IBRD / 88450 strengthening and value Post Qualification Open - National 50,000.00 0.00 Canceled 16 06 20 19 23 22 système de contrôle qualité chain governance Selection des noix de cajou. CI-FIRCA-82457-CS-CQS / 2. Productivity Recrutement d'un Consultant enhancement and Open - 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-09- consultant pour IBRD / 88450 Post Qualification 64,000.00 0.00 Canceled improved access to International 15 06 19 18 25 21 sélectionner et former des Selection markets postulants (pépiniéristes privés) au programme OPCA CI-FIRCA-106182-CS-CQS / Sélection d'un cabinet 1. Institutional Consultant pour réaliser l'étude de 2019-03- 2019-04- 2019-06- 2019-07- 2019-08- 2020-02- IBRD / 88450 strengthening and value Post Qualification Open - National 50,000.00 0.00 Canceled référence de satisfaction 31 21 04 04 08 04 chain governance Selection des acteurs sur les mesures prises du gouvernement CI-FIRCA-74838-CS-CQS / 3. Support to private Recrutement d'un cabinet Consultant investment in post-harvest Open - 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-08- pour l'élaboration d'un IBRD / 88450 Post Qualification 34,000.00 0.00 Canceled and processing International 17 07 21 20 24 23 manuel sur les bonnes Selection infrastructure pratiques de stockage dans les entrepôts CI-FIRCA-82336-CS-CQS / 2. Productivity sélectionner un consultant Consultant enhancement and Open - 2018-10- 2018-11- 2019-01- 2019-02- 2019-03- 2019-09- pour réaliser l'étude de IBRD / 88450 Post Qualification 75,000.00 0.00 Canceled improved access to International 31 21 04 03 10 06 mise en place d'un Selection markets laboratoire de vitro plants d'anacardier CI-FIRCA-82475-CS-CQS / 2. Productivity Consultant Sélectionner un cabinet enhancement and Open - 2018-10- 2018-11- 2019-01- 2019-02- 2019-03- 2019-09- IBRD / 88450 Post Qualification 67,000.00 0.00 Canceled pour réaliser l'étude de improved access to International 31 21 04 03 10 06 Selection faisabilité de création des markets CDC CI-FIRCA-106194-CS-CQS / Sélection d'un cabinet pour la formation sur les différentes étapes du 1. Institutional Consultant 2020-04- 2020-05- 2020-07- 2020-08- 2020-09- 2021-03- processus de IBRD / 88450 strengthening and value Post Qualification Open - National 22,000.00 0.00 Canceled 29 20 03 02 06 05 transformation de la noix chain governance Selection de cajou désagrégées selon la qualification (technicien,superviseurs ,managers /gestions ) CI-FIRCA-106446-CS-CQS / Recruter un cabinet pour la sensibilisation et la formation des acteurs 3. Support to private Consultant (ONG& Association) et des investment in post-harvest Pending 2020-05- 2020-05- 2020-07- 2020-08- 2020-09- 2021-03- IBRD / 88450 Post Qualification Open - National 37,000.00 0.00 membres des commissions and processing Implementation 04 25 08 07 11 10 Selection d'évaluation et de purge des infrastructure droits coutumiers sur les différentes étapes de la réinstallation à Bondoukou CI-FIRCA-126671-CS-CQS 2. Productivity / Sélection d'un cabinet Consultant enhancement and 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- pour réaliser les études IBRD / 88450 Post Qualification Limited 28,000.00 0.00 Canceled improved access to 30 13 13 17 15 techniques du sites CDC de Selection markets Koro sanankoro ( Touba) CI-FIRCA-126731-CS-CQS / Recruter 1 consultant 2. Productivity Consultant pour la mission d'audit et enhancement and 2019-09- 2019-09- 2019-10- 2019-11- 2020-05- IBRD / 88450 Post Qualification Limited 38,000.00 0.00 Canceled de contrôle des pépinières improved access to 09 23 23 27 25 Selection privées pour la production markets des plants greffés par les Pépiniéristes CI-FIRCA-74802-CS-CQS / 2. Productivity Recrutement d'un Consultant enhancement and Open - 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-09- consultant pour la IBRD / 88450 Post Qualification 80,000.00 0.00 Canceled improved access to International 15 06 19 18 25 21 conception et l'illustration Selection markets des outils didactiques CI-FIRCA-74815-CS-CQS / Recrutement d'un Cabinet pour le contrôle technique 2. Productivity Consultant des Travaux de enhancement and Open - 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-08- IBRD / 88450 Post Qualification 250,000.00 0.00 Canceled réhabilitation par RC et improved access to International 15 05 19 18 22 21 Selection RLTPC de 128 km dans la markets Région du Gontougo et les Départements de Katiola et Dabakala (Mission 2) CI-FIRCA-75277-CS-CQS / Recrutement de cabinets pour la mission d'étude environnementale et 2. Productivity Consultant sociales du second enhancement and 2018-09- 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- IBRD / 88450 Post Qualification Open - National 150,000.00 0.00 Canceled programme construction de improved access to 18 09 22 22 26 25 Selection 100 km et de réhabilitation markets de par RC et RLTPC 250 km de routes rurales (à faire par l'AGEROUTE) CI-FIRCA-106447-CS-CQS / Recruter un cabinet pour la sensibilisation et la formation des acteurs 3. Support to private Consultant (ONG& Association) et des investment in post-harvest Pending 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- IBRD / 88450 Post Qualification Open - National 37,000.00 0.00 membres des commissions and processing Implementation 19 10 23 22 27 25 Selection d'évaluation et de purge des infrastructure droits coutumiers sur les différentes étapes de la réinstallation à Séguéla CI-FIRCA-82309-CS-QCBS 2. Productivity / Recrutement d'un cabinet enhancement and Quality And Cost- Open - 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-06- 2019-08- 2020-08- IBRD / 88450 Post 700,000.00 0.00 Canceled en vue d'identifier les improved access to Based Selection International 23 13 29 26 26 30 04 03 producteurs de noix de markets cajou CI-FIRCA-74777-CS-QCBS 4. Program coordination, Quality And Cost- Open - 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-07- 2020-06- / Recrutement de IBRD / 88450 monitoring and knowledge Post 300,000.00 0.00 Canceled Based Selection International 20 10 23 23 22 27 01 30 consultants pour le management coaching des OPA CI-FIRCA-157368-CS-CQS / Recrutement d'un consultant pour réaliser 2. Productivity l’étude d’identification et de Consultant enhancement and 2020-11- 2020-09- 2020-11- 2021-01- 2020-11- 2021-02- 2020-12- 2021-03- 2020-12- 2021-09- cartographie des parcelles IBRD / 88450 Post Qualification Open - National 112,000.00 102,457.73 Signed improved access to 04 29 25 08 13 07 01 14 11 10 potentielles pour le Selection markets reboisement suivant les espèces identifiées et leur caractérisation CI-FIRCA-192595-CS-CQS / recrutement d’un cabinet 1. Institutional Consultant Under 2020-09- 2020-09- 2020-10- 2020-11- 2020-12- 2020-12- 2021-01- 2021-07- pour l’accompagnement à la IBRD / 88450 strengthening and value Post Qualification Open - National 50,000.00 0.00 Implementation 18 22 09 22 28 22 26 25 mise en œuvre d’un chain governance Selection laboratoire central au CITA. CI-FIRCA-192599-CS-CQS / recrutement d’un 1. Institutional Consultant consultant pour l’appui à Under 2020-09- 2020-09- 2020-10- 2020-11- 2020-12- 2020-12- 2021-01- 2021-07- IBRD / 88450 strengthening and value Post Qualification Open - National 76,000.00 0.00 l’élaboration de la stratégie Implementation 18 22 09 22 28 22 26 25 chain governance Selection national pour le développement des équipementiers CI-FIRCA-201742-CS-CQS / Recrutement d’un Cabinet pour la mission de contrôle 2. Productivity technique du second Consultant enhancement and Under 2020-12- 2021-04- 2020-12- 2021-01- 2021-02- 2021-08- programme de travaux de IBRD / 88450 Post Qualification Limited 280,000.00 0.00 improved access to Implementation 01 19 15 14 18 17 réhabilitation par RC et Selection markets RLTPC de 125 km de routes rurales dans les Régions du Gbèkè et du Hambol (Mission II.1) CI-FIRCA-201745-CS-CQS / Recrutement d’un Cabinet pour la mission de contrôle 2. Productivity technique du second Consultant enhancement and Under 2020-12- 2021-04- 2020-12- 2021-01- 2021-02- 2021-08- programme de travaux de IBRD / 88450 Post Qualification Limited 280,000.00 0.00 improved access to Implementation 01 19 15 14 18 17 réhabilitation par RC et Selection markets RLTPC de 125 km de routes rurales dans les Régions du Gontougo et du Hambol (Mission II.2) CI-FIRCA-201793-CS-CQS / Recrutement d’un Cabinet pour la mission d'études 2. Productivity Consultant techniques détaillé du enhancement and Under 2020-12- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IBRD / 88450 Post Qualification Limited 280,000.00 0.00 troisième programme de improved access to Implementation 01 17 15 14 18 17 Selection réhabilitation par RC ou markets RLTPC de 400,3 km de routes rurales dans la Région du BERE CI-FIRCA-201800-CS-CQS / Recrutement d’un Cabinet pour la mission de contrôle 2. Productivity Consultant technique des travaux enhancement and Under 2020-12- 2021-02- 2020-12- 2021-01- 2021-02- 2021-08- IBRD / 88450 Post Qualification Limited 100,000.00 0.00 d'entretien par RLEP de 465 improved access to Implementation 01 09 15 14 18 17 Selection km de routes rurales dans markets les Régions du Gbèkè, du Hambol et du Gontougo Page 8 CI-FIRCA-201805-CS-CQS / Recruter 3 consultants 2. Productivity pour la réalisation des Consultant enhancement and Pending 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- EIES/CIES du troisième IBRD / 88450 Post Qualification Open - National 180,000.00 0.00 improved access to Implementation 20 11 24 23 30 26 programme de Selection markets réhabilitation par RC ou RLTPC de 400,3 km de routes rurales dans la Région du BERE CI-FIRCA-157658-CS-CQS / Recrutement d'un consultant (FIRME)pour faire 1. Institutional Consultant le suivi et le contrôle des Pending 2021-01- 2021-01- 2021-03- 2021-04- 2021-05- 2021-11- IBRD / 88450 strengthening and value Post Qualification Open - National 65,000.00 0.00 travaux de réhabilitation et Implementation 04 25 10 09 14 10 chain governance Selection d'extension des bâtiments des délégations régionales du CCA (Korhogo, Bouaké,Bondoukou, Séguéla) CI-FIRCA-158224-CS-CQS / Recrutement d'un consultant individuel pour 1. Institutional Consultant la réalisation d'une étude 2020-04- 2020-05- 2020-06- 2020-07- 2020-08- 2021-02- IBRD / 88450 strengthening and value Post Qualification Open - National 37,000.00 0.00 Canceled sur la stratégie de 10 01 14 14 18 14 chain governance Selection développement communautaire dans les zones de production de l'anacarde CI-FIRCA-201962-CS-CQS / Recruter un Cabinet pour 1. Institutional Consultant l'appui au bilan de la Pending 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 strengthening and value Post Qualification Open - National 131,000.00 0.00 réforme de la filière Implementation 05 26 09 08 15 11 chain governance Selection anacarde (Étude, élaboration de textes réglementaires/législatifs) CI-FIRCA-157370-CS-CQS 2. Productivity / Recrutement de Consultant enhancement and 2021-03- 2021-04- 2021-05- 2021-06- 2021-07- 2022-01- consultants pour le suivi IBRD / 88450 Post Qualification Open - National 75,000.00 0.00 Canceled improved access to 15 05 19 18 23 19 technique des opérations de Selection markets reboisement compensatoire CI-FIRCA-157362-CS-CQS / Recrutement de 2. Productivity Consultant consultants pour le enhancement and 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Qualification Open - National 56,000.00 0.00 Canceled renforcement de capacités improved access to 13 04 17 16 23 19 Selection des agents du conseil markets agricole dédié à la mise en œuvre du PGP CI-FIRCA-157332-CS-CQS / Recrutement d'un cabinet 2. Productivity pour le suivi des travaux Consultant enhancement and 2020-09- 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- d'aménagement et de IBRD / 88450 Post Qualification Open - National 56,000.00 0.00 Canceled improved access to 30 21 04 03 07 06 construction des Selection markets infrastructures de base des 3 CDC CI-FIRCA-106907-CS- QCBS / Recrutement d'un 3. Support to private bureau d'étude pour le investment in post-harvest Quality And Cost- 2019-07- 2019-08- 2019-10- 2019-10- 2019-11- 2020-01- 2020-02- 2021-02- dimensionnement et l'étude IBRD / 88450 Post Open - National 940,000.00 0.00 Canceled and processing Based Selection 30 20 03 31 30 04 08 07 technique du centre de infrastructure valorisation des sous produits Anacarde CI-FIRCA-201999-CS-CQS / Recrutement d'un cabinet pour réaliser le suivi et le 3. Support to private Consultant contrôle des travaux de investment in post-harvest Pending 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- IBRD / 88450 Post Qualification Open - National 132,000.00 0.00 construction du centre de and processing Implementation 01 22 05 05 09 05 Selection vie, du poste de police, infrastructure bureaux administratifs et du centre de secours (GSPM) de la ZAI de Bondoukou CI-FIRCA-157552-CS-CQS / recrutement d'une entreprise spécialisé pour la conception , l'élaboration 3. Support to private Consultant d'un mode de gestion et la investment in post-harvest Pending 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- IBRD / 88450 Post Qualification Open - National 186,000.00 0.00 realisation des etiudes and processing Implementation 06 27 10 09 14 10 Selection techniques du centre de infrastructure valorisation des coques de noix de cajoux sur les ZAI de Korhogo Bondoukou Séguéla et Yamoussoukro CI-FIRCA-202007-CS-CQS / Recrutement d'un consultant pour la 3. Support to private Consultant réalisation de l'EIES/CIES du investment in post-harvest Pending 2020-11- 2020-12- 2021-02- 2021-03- 2021-04- 2021-10- IBRD / 88450 Post Qualification Open - National 80,000.00 0.00 sous-projet de centre de and processing Implementation 30 21 03 05 09 06 Selection valorisation des coques de infrastructure noix de cajou sur la zone industrielle de Yamoussoukro CI-FIRCA-157561-CS-CQS / Recrutement d'un cabinet 3. Support to private Consultant pour la conception et la investment in post-harvest Pending 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- IBRD / 88450 Post Qualification Open - National 37,000.00 0.00 réalisation des études and processing Implementation 15 15 17 30 04 07 Selection techniques des infrastructure équipements et infrastructures du HUB CI-FIRCA-157557-CS-CQS / Recruter une firme pour réaliser une étude de marché en vue de la 3. Support to private Consultant promotion de la investment in post-harvest Pending 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Qualification Open - National 75,000.00 0.00 consommation des produits and processing Implementation 05 26 09 08 15 11 Selection dérivés de l'anacarde et infrastructure proposer une stratégie de promotion de la consommation de ces produits CI-FIRCA-157562-CS-CQS / Sélection d'un laboratoire pour la détermination des caractéristiques/paramètres 3. Support to private Consultant physico-chimiques (valeurs investment in post-harvest Pending 2020-10- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Qualification Open - National 28,000.00 0.00 énergétiques, minéraux et and processing Implementation 29 19 02 01 08 04 Selection vitamines), organoleptiques infrastructure des produits dérivés de l'anacarde fabriqués localement CI-FIRCA-201964-CS-CDS / Recrutement d'un cabinet 1. Institutional Consultant Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- pour l'évaluation externe du IBRD / 88450 strengthening and value Post Qualification Open - National 112,000.00 0.00 Implementation 20 10 26 25 30 26 conseil agricole dédié aux chain governance Selection producteurs d'anacarde CI-FIRCA-213689-CS-CQS 1. Institutional Consultant / Recrutement d'un Pending 2021-01- 2021-02- 2021-04- 2021-05- 2021-06- 2021-12- IBRD / 88450 strengthening and value Post Qualification Open - National 40,000.00 0.00 Consultant pour Implementation 30 20 05 05 09 06 chain governance Selection l'actualisation du Manuel de procédure du PPCA CI-PPCA-224283-CS-CQS / Recruter un consultant 1. Institutional Consultant pour réaliser l'étude de Pending 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-05- IBRD / 88450 strengthening and value Post Qualification Open - National 50,000.00 0.00 référence de satisfaction Implementation 15 05 18 18 22 21 chain governance Selection des acteurs sur les mesures prises par le Gouvernement CI-PPCA-224284-CS-CQS 3. Support to private / Recruter un Consultant investment in post-harvest Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2022-04- Consultant/firme pour la IBRD / 88450 Post Qualification Open - National 196,000.00 0.00 and processing Implementation 21 12 25 24 29 27 réalisation de l'EIES/CIES de Selection infrastructure la ZI de Yamoussoukro (250 ha) CI-PPCA-224287-CS-CQS / Recruter un consultant pour réaliser une mission 3. Support to private de contrôle pour suivre les Consultant investment in post-harvest Pending 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-05- travaux de construction du IBRD / 88450 Post Qualification Open - National 168,000.00 0.00 and processing Implementation 12 02 15 15 19 18 centre de vie, du poste de Selection infrastructure police, bureaux administratifs et du centre de secours (GSPM) de la ZAI de Korhogo CI-PPCA-224288-CS-CQS / Recruter un consultant 1. Institutional Consultant Pending 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- 2022-03- pour former les formateurs IBRD / 88450 strengthening and value Post Qualification Open - National 56,000.00 0.00 Implementation 24 14 28 27 01 30 du CITA (andragogie, chain governance Selection sécurité au travail, etc.,) CI-PPCA-224291-CS-CQS / Recruter un consultant pour réaliser une mission 3. Support to private de contrôle pour suivre les Consultant investment in post-harvest Pending 2021-09- 2021-10- 2021-12- 2022-01- 2022-02- 2022-08- travaux de construction du IBRD / 88450 Post Qualification Open - National 112,000.00 0.00 and processing Implementation 30 21 04 03 07 06 centre de vie, du poste de Selection infrastructure police, bureaux administratifs et du centre de secours (GSPM) de la ZAI de Bondoukou CI-PPCA-224296-CS-CQS / Recruter un consultant 3. Support to private pour réaliser une mission Consultant investment in post-harvest Pending 2021-08- 2021-08- 2021-10- 2021-11- 2021-12- 2022-06- de contrôle pour contrôler IBRD / 88450 Post Qualification Open - National 71,000.00 0.00 and processing Implementation 10 31 14 13 18 16 les travaux de construction Selection infrastructure d'infrastructures relatives au HUB pilote CI-PPCA-224298-CS-CQS / Recruter un laboratoire pour réaliser analyses qualité des eaux usées de 1. Institutional Consultant Under 2021-05- 2021-05- 2021-06- 2021-07- 2021-08- 2022-02- process, fumées de la IBRD / 88450 strengthening and value Post Qualification Limited 7,000.00 0.00 Implementation 25 19 08 08 12 08 chaudière et niveau de bruit chain governance Selection sur le site (dans le cadre de l'attribution de l'Arrêté d'autorisation d'Exploitation au CITA) CI-PPCA-224299-CS-CQS / Recruter un consultant 3. Support to private Consultant pour réaliser les études en investment in post-harvest Pending 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-06- IBRD / 88450 Post Qualification Open - National 75,000.00 0.00 vue des mesures de and processing Implementation 23 13 27 26 31 29 Selection sauvegardes infrastructure environnementales et sociales des plateformes de services CI-PPCA-224301-CS-CQS / Recruter un cabinet pour 3. Support to private Consultant la réalisation des études investment in post-harvest Pending 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-05- IBRD / 88450 Post Qualification Open - National 279,000.00 0.00 techniques des and processing Implementation 15 05 18 18 22 21 Selection infrastructures d'appui à la infrastructure zone industrielle de Yamoussoukro CI-PPCA-224305-CS-CQS / Recruter une firme pour réaliser une étude de marché sur la promotion de 3. Support to private Consultant la consommation des sous- investment in post-harvest Pending 2021-09- 2021-10- 2021-12- 2022-01- 2022-02- 2022-08- IBRD / 88450 Post Qualification Open - National 75,000.00 0.00 produits de l'anacarde et and processing Implementation 30 21 04 03 07 06 Selection proposer une stratégie de infrastructure promotion de la consommation des sous- produits de l'anacarde CI-PPCA-224307-CS-CQS / Recruter une firme pour 3. Support to private renforcer les capacités de Consultant investment in post-harvest Pending 2021-06- 2021-07- 2021-09- 2021-10- 2021-11- 2022-05- 12 PME transformatrices en IBRD / 88450 Post Qualification Open - National 47,000.00 0.00 and processing Implementation 30 21 03 03 07 06 techniques de promotion Selection infrastructure sur lieu de vente et en marketing-management CI-PPCA-224308-CS-CQS 1. Institutional Consultant Pending 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- / Recruter un consultant IBRD / 88450 strengthening and value Post Qualification Open - National 94,000.00 0.00 Implementation 17 07 21 20 24 23 pour actualiser le SYGES chain governance Selection Anacarde CI-PPCA-224311-CS-CQS / Recruter des Consultants 3. Support to private Consultant individuels pour la investment in post-harvest Pending 2021-10- 2022-04- IBRD / 88450 Post Qualification Open - National 56,000.00 0.00 réalisation des EIES/CIES and processing Implementation 20 18 Selection des petites unités de infrastructure décorticage de noix de cajou CI-PPCA-224862-CS-QCBS 4. Program coordination, / Recruter un cabinet pour Quality And Cost- Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-12- IBRD / 88450 monitoring and knowledge Post Open - National 70,000.00 0.00 l'audit externe pour Based Selection Implementation 10 01 14 11 11 15 20 20 management l'exercice 2021, 2022 et 2023 CI-PPCA-224870-CS-CQS 4. Program coordination, Consultant / Recruter un cabinet en vue Pending 2021-04- 2021-05- 2021-07- 2021-07- 2021-09- 2022-03- IBRD / 88450 monitoring and knowledge Post Qualification Open - National 30,000.00 0.00 d'évaluer le comportement Implementation 27 18 01 31 04 03 management Selection des génotypes en diffusion CI-PPCA-225010-CS-CQS / Recruter un consultant en 2. Productivity Consultant vue de réaliser l'évaluation enhancement and Pending 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- IBRD / 88450 Post Qualification Open - National 101,000.00 0.00 externe des activités du improved access to Implementation 20 10 24 23 27 26 Selection Programme National de markets Recherche sur l'Anacarde (PNRA) CI-PPCA-225013-CS-QCBS / Recruter un consultant en 2. Productivity vue de réaliser des études enhancement and Quality And Cost- Pending 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-11- IBRD / 88450 Post Open - National 372,000.00 0.00 techniques pour la mise en improved access to Based Selection Implementation 20 10 24 21 20 25 29 29 place de laboratoires markets agronomiques au CITA CI-PPCA-225017-CS-CQS / Recruter un/des bureau(x) 2. Productivity de contrôle pour assurer le Consultant enhancement and Pending 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- 2022-03- contrôle et le suivi IBRD / 88450 Post Qualification Open - National 373,000.00 0.00 improved access to Implementation 25 15 29 28 02 31 techniques, Selection markets environnementaux et sociaux des travails relatifs aux 3 CDC CI-PPCA-225023-CS-CQS / Recruter un cabinet pour 2. Productivity Consultant réaliser deux missions de enhancement and Pending 2021-05- 2021-05- 2021-07- 2021-08- 2021-09- 2022-03- IBRD / 88450 Post Qualification Open - National 94,000.00 0.00 suivi et d'évaluation des improved access to Implementation 10 31 14 13 17 16 Selection activités du Conseil Agricole markets dédié à l'Anacarde (CAA) 2021 CI-PPCA-225109-CS-CQS / Recruter un Consultant 2. Productivity pour le contrôle de Consultant enhancement and Pending 2021-07- 2021-08- 2021-10- 2021-11- 2021-12- 2022-06- l’exécution des travaux de IBRD / 88450 Post Qualification Open - National 280,000.00 0.00 improved access to Implementation 31 21 04 03 08 06 réhabilitation et Selection markets construction de 200 km de routes rurales de la Région du Béré (Mission 3.1) CI-PPCA-225202-CS-CQS / Recruter un Consultant 2. Productivity pour le contrôle de Consultant enhancement and Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2022-04- l’exécution des travaux de IBRD / 88450 Post Qualification Open - National 280,000.00 0.00 improved access to Implementation 15 06 19 18 23 21 réhabilitation et Selection markets construction de 200 km de routes rurales de la Région du Béré (Mission 3.1) CI-PPCA-225206-CS-CQS / Recruter un Consultant 2. Productivity pour le contrôle de Consultant enhancement and Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2022-04- l’exécution des travaux de IBRD / 88450 Post Qualification Open - National 280,000.00 0.00 improved access to Implementation 18 09 22 21 26 24 réhabilitation et Selection markets construction de 200 km de routes rurales de la Région du Béré Mission 3.2) CI-PPCA-225288-CS-CQS / Sélection d'une agence événementielle pour la mise 3. Support to private Consultant en œuvre de la stratégie de investment in post-harvest Pending 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-05- IBRD / 88450 Post Qualification Open - National 140,000.00 0.00 promotion de la and processing Implementation 14 04 17 17 21 20 Selection consommation locale du infrastructure cajou et l'organisation des événements INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated Contract / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract No. Approach Amount (US$) Status Contract Completion (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIRCA-71017-CS-INDV 4. Program coordination, Individual / Recrutement d'un 2018-07- 2018-08- 2018-08- 2018-10- 2019-04- IBRD / 88450 monitoring and knowledge Prior Consultant Direct 21,000.00 0.00 Canceled coordonnateur adjoint 31 10 31 05 03 management Selection chargé de l'industrie CI-FIRCA-72423-CS-INDV 4. Program coordination, Individual / Recrutement d'un 2018-02- 2018-08- 2018-09- 2018-10- 2019-04- IBRD / 88450 monitoring and knowledge Prior Consultant Direct 21,000.00 0.00 Canceled coordonnateur adjoint 27 20 10 15 13 management Selection chargé de l'industrie Page 9 CI-FIRCA-74764-CS-INDV / Recrutement de 5 4. Program coordination, Individual 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- consultants pour l'appui à la IBRD / 88450 monitoring and knowledge Post Consultant Open 63,000.00 0.00 Canceled 11 29 20 24 23 mise en œuvre des activités management Selection sur le terrain par le CCA CI-FIRCA-74768-CS-INDV 4. Program coordination, Individual / Recrutement d'un 2018-10- 2019-05- 2018-12- 2019-01- 2019-02- 2019-08- IBRD / 88450 monitoring and knowledge Post Consultant Open 72,000.00 0.00 Under Review spécialiste assistance 29 13 17 07 11 10 management Selection technique industrielle CI-FIRCA-74769-CS-INDV 4. Program coordination, Individual 2019-03- 2019-05- 2019-06- 2019-07- 2020-01- / Recrutement d'un IBRD / 88450 monitoring and knowledge Post Consultant Open 24,000.00 0.00 Canceled 28 16 06 11 07 spécialiste marché et management Selection commerce CI-FIRCA-74772-CS-INDV 4. Program coordination, Individual 2018-10- 2019-07- 2018-12- 2019-07- 2018-12- 2019-09- 2019-01- 2019-09- 2019-07- / Recrutement d'une IBRD / 88450 monitoring and knowledge Post Consultant Open 24,000.00 998.30 Signed 18 19 06 26 27 05 31 30 30 assistante volet production management Selection CI-FIRCA-74775-CS-INDV 4. Program coordination, Individual 2018-10- 2018-12- 2018-11- 2019-01- 2018-12- 2019-01- 2019-03- 2019-07- / Recrutement d'une IBRD / 88450 monitoring and knowledge Post Consultant Open 24,000.00 14,423.72 Signed 11 12 29 10 20 24 29 23 assistante volet management Selection transformation CI-FIRCA-74779-CS-INDV / Recrutement d un 4. Program coordination, Individual spécialiste pour l'appui à la 2018-10- 2019-05- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-06- 2019-01- IBRD / 88450 monitoring and knowledge Post Consultant Direct 22,000.00 18,127.43 Completed mise en œuvre des mesures 17 13 27 07 17 21 22 21 20 25 management Selection de sauvegarde sociale et environnementale CI-FIRCA-74821-CS-INDV / Recrutement de 4. Program coordination, Individual 2018-10- 2018-12- 2019-01- 2019-02- 2019-08- consultants individuels sur IBRD / 88450 monitoring and knowledge Post Consultant Open 200,000.00 0.00 Canceled 30 18 08 19 18 les mesures de sauvegarde management Selection environnements et sociales. CI-FIRCA-75270-CS-CDS / Recrutement d'un 1. Institutional consultant pour faire 2018-10- 2018-11- 2019-01- 2019-07- IBRD / 88450 strengthening and value Post Direct Selection Direct 100,000.00 0.00 Canceled l'évaluation des 29 08 12 11 chain governance performances de 10 OPA de la filière anacarde avec des outils disponibles. CI-FIRCA-77855-CS-INDV 4. Program coordination, Individual 2018-03- 2019-05- 2018-06- 2018-07- 2018-07- 2019-01- / Recrutement du IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 0.00 Under Review 22 13 19 05 31 27 Spécialiste en sauvegarde management Selection environnementale CI-FIRCA-77904-CS-INDV 4. Program coordination, Individual / Recrutement du 2018-03- 2019-05- 2018-06- 2018-07- 2018-07- 2019-01- IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 0.00 Under Review SPÉCIALISTE 22 13 19 05 31 27 management Selection INFRASTRUCTURES INDUSTRIELLES CI-FIRCA-77910-CS-INDV 4. Program coordination, Individual / RECRUTEMENT DU 2018-03- 2019-05- 2018-06- 2018-07- 2018-08- 2018-07- 2019-02- IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 46,920.01 Signed SPÉCIALISTE EN 22 13 18 05 31 31 27 management Selection VULGARISATION AGRICOLE CI-FIRCA-77937-CS-INDV 4. Program coordination, Individual / RECRUTEMENT D4UN 2018-03- 2018-02- 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2018-08- 2019-02- IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 46,920.01 Signed SPÉCIALISTE EN 15 25 19 15 20 20 30 13 26 management Selection INFRASTRUCTURES RURALES CI-FIRCA-77946-CS-INDV 4. Program coordination, Individual / RECRUTEMENT DU 2018-03- 2019-05- 2018-06- 2018-07- 2018-07- 2018-07- 2019-01- IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 0.00 Under Review SPÉCIALISTE EN SUIVI- 15 13 19 10 31 31 27 management Selection EVALUATION CI-FIRCA-77956-CS-INDV / RECRUTEMENT DU SPÉCIALISTE DE L'APPUI 4. Program coordination, Individual 2018-03- 2019-05- 2018-06- 2018-07- 2018-08- 2019-02- AUX ORGANISATIONS IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 0.00 Under Review 22 13 19 05 09 05 PROFESSIONNELLES ET management Selection DÉVELOPPEMENT COMMUNAUTAIRE CI-FIRCA-77991-CS-INDV 4. Program coordination, Individual / RECRUTEMENT DU 2018-03- 2019-05- 2018-08- 2018-08- 2018-09- 2018-10- 2019-04- IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 0.00 Under Review SPÉCIALISTE GENRE ET 15 13 24 24 28 09 07 management Selection INCLUSION SOCIALE CI-FIRCA-82009-CS-INDV 4. Program coordination, Individual 2018-10- 2018-12- 2018-12- 2019-02- 2019-08- / Recrutement d'un auditeur IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 0.00 Canceled 22 10 31 04 03 interne management Selection CI-FIRCA-82235-CS-CDS / Convention avec le BNETD pour la réalisation des 3. Support to private études techniques investment in post-harvest 2018-10- 2018-10- 2018-10- 2019-01- 2019-01- 2019-07- 2019-06- IBRD / 88450 Post Direct Selection Direct 340,000.00 216,785.14 Completed (APS,APD), pour and processing 19 12 29 02 07 01 03 l'aménagement de la zone infrastructure industrielle de Korhogo et préparation des DAO pour les appels d'offres CI-FIRCA-82313-CS-CDS / 4. Program coordination, Under 2018-11- 2018-12- 2019-02- 2019-08- contrat CCA FIRCA pour la IBRD / 88450 monitoring and knowledge Prior Direct Selection Direct 2,400,000.00 0.00 Implementation 29 09 12 11 gestion Fiduciaire du PPCA management CI-FIRCA-74748-CS-CDS / 2. Productivity Convention CCA FIRCA pour enhancement and 2018-10- 2019-05- 2018-10- 2018-12- 2019-06- la gestion de la sous IBRD / 88450 Post Direct Selection Direct 1,082,000.00 0.00 Under Review improved access to 01 13 11 15 13 composante 2.1 et la sous markets composante 2.2 CI-FIRCA-74756-CS-CDS / 4. Program coordination, Recrutement d'un 2018-11- 2019-05- 2018-11- 2019-02- 2019-08- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 84,000.00 0.00 Under Review spécialiste recherche- 20 13 30 03 02 management développement agricole CI-FIRCA-74823-CS-CDS / Recrutement de l'ESA par entente directe pour faire 1. Institutional 2018-11- 2019-04- 2018-12- 2019-05- 2019-02- 2019-06- 2019-08- 2019-09- l'évaluation des IBRD / 88450 strengthening and value Post Direct Selection Direct 100,000.00 73,097.53 Completed 30 24 10 24 13 18 12 02 performances de 10 OPA de chain governance la filière anacarde avec des outils disponibles CI-FIRCA-74825-CS-CDS / Recrutement d'un cabinet 1. Institutional 2018-10- 2018-10- 2018-11- 2018-10- 2019-01- 2018-11- 2019-07- 2019-01- pour l'installation du IBRD / 88450 strengthening and value Post Direct Selection Direct 140,000.00 69,061.82 Completed 27 12 06 22 10 14 09 13 Logiciel LOGISCOOP et la chain governance formation de 100 OPA à son utilisation CI-FIRCA-75208-CS-CDS / Convention avec l'AGEDI 3. Support to private pour les APS et APD et investment in post-harvest 2018-11- 2018-10- 2018-11- 2018-11- 2019-01- 2019-01- 2019-07- 2019-06- IBRD / 88450 Post Direct Selection Direct 250,000.00 189,156.84 Completed préparation des dossiers and processing 05 12 15 13 19 07 18 06 d'appels pour les sites de infrastructure Korhogo, Bondoukou, Bouaké et Seguéla. CI-FIRCA-75271-CS-CDS / Convention avec le BNETD 1. Institutional pour la conception d'un Pending 2018-11- 2018-12- 2019-02- 2019-08- IBRD / 88450 strengthening and value Post Direct Selection Direct 84,000.00 0.00 dispositif d'analyse et de Implementation 30 10 13 12 chain governance veille économique sur la filière anacarde. CI-FIRCA-82299-CS-CDS / 2. Productivity Convention avec AGEROUTE enhancement and 2018-11- 2018-11- 2018-11- 2018-11- 2019-02- 2019-01- 2019-07- IBRD / 88450 Post Direct Selection Direct 350,000.00 523,477.40 Signed sur les travaux d'entretien improved access to 18 05 28 27 01 07 31 et de réhabilitation des markets pistes CI-FIRCA-82319-CS-CDS / Contrat entre FIRCA et ANADER pour la mise en 2. Productivity œuvre des activités du enhancement and Under 2018-11- 2018-10- 2018-12- 2019-02- 2019-08- IBRD / 88450 Post Direct Selection Direct 1,900,000.00 0.00 conseil agricole dédié aux improved access to Implementation 30 15 10 13 12 producteurs d'anacarde, markets campagne 2017/2018 (août 2017 à juillet 2018) CI-FIRCA-82318-CS-CDS / Contrat FIRCA et ICRAF pour la mise en œuvre des 2. Productivity activités de surveillance de enhancement and 2018-11- 2019-01- 2018-12- 2018-10- 2019-02- 2019-05- 2019-08- IBRD / 88450 Post Direct Selection Direct 555,000.00 1,155,412.93 Signed la santé et la fertilité des improved access to 30 10 10 09 13 24 12 sols sous anacardiers markets (PNRA) et appui aux services de transfert de technologies sur l'anacarde CI-FIRCA-82323-CS-CDS / Contrat entre FIRCA et ANADER pour la mise en 2. Productivity œuvre des activités du enhancement and Under 2019-01- 2019-02- 2019-02- 2019-04- 2019-10- IBRD / 88450 Post Direct Selection Direct 1,992,000.00 0.00 conseil agricole dédié aux improved access to Implementation 24 05 03 09 06 producteurs d'anacarde, markets campagne 2019 (janvier à Décembre 2019) CI-FIRCA-82322-CS-CDS / Contrat entre le FIRCA et le 2. Productivity CNRA pour la poursuite du enhancement and 2018-11- 2018-12- 2018-12- 2018-10- 2019-02- 2019-06- 2019-08- programme d'amélioration IBRD / 88450 Post Direct Selection Direct 290,000.00 1,272,793.49 Signed improved access to 30 26 10 09 13 06 12 variétale(PNRA) et de markets fourniture du matériel végétal amélioré aux producteurs CI-FIRCA-82324-CS-CDS / Contrat entre FIRCA et ANADER pour la mise en 2. Productivity œuvre des activités du enhancement and 2018-11- 2018-08- 2018-12- 2018-10- 2019-02- 2018-12- 2019-08- IBRD / 88450 Post Direct Selection Direct 795,000.00 1,691,598.83 Signed conseil agricole dédié aux improved access to 30 01 10 15 13 04 12 producteurs d'anacarde, markets campagne 2017/2018 (août 2018 à Décembre 2018) CI-FIRCA-82327-CS-CDS / 2. Productivity Contrat entre FIRCA et UNA enhancement and 2018-11- 2019-01- 2018-12- 2018-10- 2019-02- 2019-05- 2019-08- pour la mise en œuvre des IBRD / 88450 Post Direct Selection Direct 214,000.00 83,690.68 Signed improved access to 30 16 10 09 13 17 12 activités de biotechnologie markets du PNRA CI-FIRCA-82329-CS-CDS / 2. Productivity Contrat entre FIRCA et UFHB enhancement and 2018-11- 2019-01- 2018-12- 2018-10- 2019-02- 2019-05- 2019-08- pour la mise en œuvre des IBRD / 88450 Post Direct Selection Direct 177,000.00 661,269.23 Signed improved access to 30 14 10 09 13 24 12 activités de Défense des markets Cultures du PNRA CI-FIRCA-82333-CS-CDS / 2. Productivity Contrat FIRCA et UPGC enhancement and 2018-11- 2019-01- 2018-12- 2018-10- 2019-02- 2019-05- 2019-08- KORHOGO pour la mise en IBRD / 88450 Post Direct Selection Direct 110,000.00 779,502.13 Signed improved access to 30 14 10 08 13 24 12 œuvre des activités du markets volet fertilité des sols du PNRA CI-FIRCA-82334-CS-CDS / Contrat entre FIRCA et l'INP- 2. Productivity HB YAKRO pour la mise en enhancement and 2018-11- 2019-01- 2018-12- 2018-10- 2019-02- 2019-05- 2019-08- IBRD / 88450 Post Direct Selection Direct 110,000.00 494,324.29 Signed œuvre des activités du volet improved access to 30 15 10 09 13 28 12 valorisation des produits de markets l'anacarde du PNRA CI-FIRCA-85965-CS-CDS / Entente directe avec 1. Institutional Pending 2018-11- 2018-12- 2019-02- 2019-08- l'université HO CHI MIN IBRD / 88450 strengthening and value Post Direct Selection Direct 150,000.00 0.00 Implementation 26 06 09 08 pour l'assistance au CCA chain governance dans le cadre du partenariat CI-FIRCA-106131-CS- INDV / sélection de cinq (5) consultants individuels 1. Institutional Individual pour le renforcement de la 2019-03- 2019-04- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- 2019-09- 2019-12- IBRD / 88450 strengthening and value Post Consultant Open 116,000.00 111,818.49 Signed coordination des activités à 15 24 03 27 24 26 28 04 25 chain governance Selection mettre en œuvre par le CCA sur le terrain le terrain (OPA,productivité ,ect ) CI-FIRCA-106151-CS-CDS / Sélection par entente directe du cabinet ANKOUVI 1. Institutional NAYO pour la conception (y 2019-03- 2019-04- 2019-03- 2019-06- 2019-05- 2019-07- 2019-11- IBRD / 88450 strengthening and value Post Direct Selection Direct 100,000.00 91,758.15 Signed compris spécifications 14 30 24 24 28 23 24 chain governance techniques du matériel à acquérir) et le suivi de la collecte électronique de données. CI-FIRCA-106176-CS- 1. Institutional Individual INDV / Recrutement d'un 2019-04- 2019-03- 2019-04- 2019-04- 2019-04- 2019-05- 2019-06- 2019-06- 2019-11- 2019-07- IBRD / 88450 strengthening and value Post Consultant Limited 10,000.00 10,080.04 Completed consultant individuel pour 01 05 06 11 27 31 01 26 28 26 chain governance Selection réaliser une évaluation du LOGISCOOP CI-FIRCA-106189-CS- INDV / Sélection d'un 1. Institutional Individual 2019-03- 2019-07- 2019-03- 2019-10- 2019-04- 2020-01- 2019-05- 2020-02- 2019-11- consultant individuel pour IBRD / 88450 strengthening and value Post Consultant Limited 19,000.00 13,843.90 Signed 15 23 20 28 10 08 15 05 11 l'audit environnemental et chain governance Selection social du CITA CI-FIRCA-106441-CS- 3. Support to private INDV / Recruter un Individual investment in post-harvest 2019-03- 2019-03- 2019-05- 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-12- 2020-05- consultant pour la IBRD / 88450 Post Consultant Open 19,000.00 42,314.44 Completed and processing 15 15 03 26 24 29 28 05 25 07 réalisation du PAR de la Selection infrastructure zone agro-industrielle de Korhogo CI-FIRCA-106442-CS- 3. Support to private INDV / Recruter un Individual investment in post-harvest 2019-03- 2019-04- 2019-05- 2019-04- 2019-05- 2019-09- 2019-06- 2019-10- 2019-12- consultant pour la IBRD / 88450 Post Consultant Open 19,000.00 41,281.98 Signed and processing 15 26 03 26 24 23 28 21 25 réalisation du PAR de la Selection infrastructure zone agro-industrielle de Bondoukou CI-FIRCA-106443-CS- 3. Support to private INDV / Recruter un Individual investment in post-harvest 2019-03- 2021-04- 2019-05- 2019-12- 2019-05- 2020-01- 2019-06- 2020-02- 2019-12- consultant pour la IBRD / 88450 Post Consultant Open 19,000.00 43,875.44 Signed and processing 15 01 03 18 24 08 28 05 25 réalisation du PAR de la Selection infrastructure zone agro-industrielle de Séguéla CI-FIRCA-106451-CS-CDS 3. Support to private / Convention avec l'AGEDI investment in post-harvest Under 2019-06- 2019-07- 2019-09- 2020-03- IBRD / 88450 Post Direct Selection Direct 194,000.00 0.00 pour superviser les travaux and processing Implementation 30 10 13 11 des plateformes infrastructure industrielles CI-FIRCA-106462-CS-CDS / Recrutement d'un cabinet 4. Program coordination, Pending 2019-04- 2019-05- 2019-07- 2020-01- de formation (PANSS) sur la IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 19,000.00 0.00 Implementation 30 10 14 10 présentation efficace de management DALE CARNEGIE CI-FIRCA-106557-CS- INDV / Recrutement d'un 1. Institutional Individual spécialiste pour l'appui à la 2019-03- 2019-07- 2019-05- 2018-11- 2019-05- 2018-11- 2019-07- 2018-07- 2019-12- IBRD / 88450 strengthening and value Post Consultant Open 40,000.00 51,513.30 Signed mise en œuvre des mesures 18 11 06 07 27 07 01 31 28 chain governance Selection de sauvegarde sociale et environnementale CI-FIRCA-106562-CS- 2. Productivity Individual INDV / Recrutement d'un enhancement and 2019-03- 2019-02- 2019-05- 2019-05- 2019-05- 2019-05- 2019-07- 2019-06- 2019-12- IBRD / 88450 Post Consultant Open 67,000.00 33,084.10 Signed Coordonnateur Scientifique improved access to 18 19 06 02 27 27 01 04 28 Selection (CS) du PNRA. markets CI-FIRCA-106569-CS- INDV / Recrutement d'un 1. Institutional Individual Pending 2019-03- 2019-05- 2019-06- 2019-07- 2020-01- consultant individuel pour IBRD / 88450 strengthening and value Post Consultant Open 20,000.00 0.00 Implementation 29 17 07 12 08 l'élaboration de la stratégie chain governance Selection de communication du PPCA . CI-FIRCA-106576-CS-CDS / Recrutement de 2. Productivity consultant pour faire le enhancement and 2019-03- 2019-11- 2019-03- 2019-12- 2019-06- 2020-01- 2019-11- IBRD / 88450 Post Direct Selection Direct 84,000.00 16,937.79 Signed suivi -évaluation improved access to 18 28 28 16 01 06 28 scientifique des projets mis markets en œuvre dans le cadre du PNRA. CI-FIRCA-106602-CS- 2. Productivity Individual INDV / Sélection d'un enhancement and 2019-03- 2021-02- 2019-04- 2019-09- 2019-04- 2019-11- 2019-05- 2019-11- 2019-11- 2020-12- IBRD / 88450 Post Consultant Limited 35,000.00 44,717.31 Completed consultant pour la improved access to 31 25 05 17 26 11 31 19 27 15 Selection réalisation du PAR du CDC markets de Badikaha (Hambol). CI-FIRCA-106641-CS- 2. Productivity INDV / Sélection de trois Individual enhancement and 2019-03- 2019-01- 2019-04- 2019-03- 2019-04- 2019-05- 2019-05- 2019-06- 2019-11- 2019-12- consultants pour réaliser le IBRD / 88450 Post Consultant Limited 47,000.00 25,967.74 Completed improved access to 29 28 03 04 24 29 29 18 25 20 screening environnemental Selection markets et social de 448 Km Page 10 CI-FIRCA-106666-CS- 2. Productivity INDV / sélection de cinq Individual enhancement and 2019-03- 2019-05- 2019-04- 2019-05- 2019-04- 2019-08- 2019-05- 2019-09- 2019-11- consultants individuels pour IBRD / 88450 Post Consultant Limited 47,000.00 48,177.36 Signed improved access to 29 17 03 22 24 09 29 04 25 réaliser l'évaluation sociale Selection markets des 448 Km. CI-FIRCA-106877-CS-CDS 3. Support to private 2019-03- 2019-04- 2019-04- 2019-04- 2019-06- 2019-05- 2019-12- 2019-06- / Entente directe avec SERF IBRD / 88450 investment in post-harvest Post Direct Selection Direct 60,000.00 50,508.79 Completed 22 01 01 12 05 10 02 22 pour réaliser le CIES de and processing Korhogo infrastructure CI-FIRCA-107751-CS- 1. Institutional QCBS / Recrutement par 2019-04- 2019-06- 2019-04- 2019-06- 2019-12- IBRD / 88450 strengthening and value Post Direct Selection Direct 32,000.00 0.00 Under Review entente directe de 01 07 11 15 12 chain governance l'Informaticien archiviste DOUDOU Casimir CI-FIRCA-107754-CS- 2. Productivity INDV / recrutement du Individual enhancement and Pending 2019-04- 2019-04- 2019-04- 2019-06- 2019-11- consultant pour IBRD / 88450 Post Consultant Limited 40,000.00 0.00 improved access to Implementation 01 06 27 01 28 l'accompagnement des Selection markets unités de décorticage ''Grins de décorticage" CI-FIRCA-107784-CS- 4. Program coordination, Individual 2019-04- 2019-04- 2019-06- 2019-08- 2019-06- 2019-08- 2019-07- 2019-10- 2020-01- INDV / Recrutement d'un(e) IBRD / 88450 monitoring and knowledge Post Consultant Open 28,000.00 24,943.65 Signed 15 24 03 14 24 14 29 24 25 assistant(e) communication management Selection CI-FIRCA-118485-CS-CDS / Contrat entre FIRCA et ANADER pour la mise en 2. Productivity œuvre des activités du enhancement and Pending 2018-10- 2018-10- 2021-09- 2022-03- IBRD / 88450 Prior Direct Selection Direct 19,000,000.00 0.00 conseil agricole dédié aux improved access to Implementation 09 19 20 19 producteurs d'anacarde, markets campagne 2017/2018 (août 2017 à juillet 2018) CI-FIRCA-106114-CS-CDS / sélection par entente directe du BNETD pour 1. Institutional concevoir et mettre en place 2019-03- 2019-04- 2019-03- 2019-02- 2019-05- 2019-05- 2019-11- IBRD / 88450 strengthening and value Post Direct Selection Direct 234,000.00 197,604.82 Signed le SYSPER ,Système 14 23 24 26 28 03 24 chain governance Permanent de collecte et d'analyse de données de la filière anacarde . CI-FIRCA-126690-CS-CDS / Contrat en Entente Directe de la Direction Régionale 2. Productivity NORD de l'ANADER pour la enhancement and 2019-08- 2021-04- 2019-08- 2019-10- 2020-04- gestion des travaux de IBRD / 88450 Post Direct Selection Direct 754,000.00 0.00 Under Review improved access to 15 02 25 29 26 réhabilitation des vergers markets d'anacardiers par les tronçonneurs dans le cadre du programme des Opérateurs Professionnels du Cajou . CI-FIRCA-126703-CS-CDS / Recrutement d’un 3. Support to private consultant individuel pour investment in post-harvest 2019-08- 2019-07- 2019-08- 2019-07- 2019-10- 2019-09- 2020-04- la promotion des IBRD / 88450 Post Direct Selection Direct 50,000.00 43,903.61 Signed and processing 13 23 23 27 27 04 24 opportunités infrastructure d’investissements dans la chaine de valeur de l’anacarde en Côte d’Ivoire CI-FIRCA-126700-CS-CDS / Contrat en Entente Directe de la Direction Régionale Centre de l'ANADER pour la 2. Productivity gestion des travaux de enhancement and Under 2019-08- 2021-04- 2019-08- 2019-10- 2020-04- IBRD / 88450 Post Direct Selection Direct 558,000.00 0.00 réhabilitation des vergers improved access to Implementation 17 02 27 31 28 d'anacardiers par les markets tronçonneurs dans le cadre du programme des Opérateurs Professionnels du Cajou ( OPCA ) CI-FIRCA-126706-CS-CDS / Recruter un Cabinet pour l’extension du Système 1. Institutional 2019-08- 2019-10- 2019-09- 2019-10- 2019-11- 2019-12- 2020-05- Informatisé de Gestion des IBRD / 88450 strengthening and value Post Direct Selection Direct 60,000.00 91,736.70 Signed 30 03 09 23 13 13 11 Mouvements de l’Anacarde chain governance (SIGEMA) dans le cadre du SYSPER CI-FIRCA-126707-CS-CDS / Contrat en Entente Directe de la Direction Régionale CENTRE-OUEST de 2. Productivity l’ANADER pour la gestion enhancement and 2019-08- 2021-04- 2019-08- 2019-10- 2020-04- des travaux de IBRD / 88450 Post Direct Selection Direct 290,000.00 0.00 Under Review improved access to 15 02 25 29 26 réhabilitation des vergers markets d’anacardiers par les tronçonneurs dans le cadre du programme des Opérateurs Professionnels du Cajou (OPCA) CI-FIRCA-126712-CS-CDS / Contrat en Entente Directe de la Direction Régionale OUEST de l’ANADER pour la 2. Productivity gestion des travaux de enhancement and 2019-08- 2021-04- 2019-08- 2019-10- 2020-04- IBRD / 88450 Post Direct Selection Direct 157,000.00 0.00 Under Review réhabilitation des vergers improved access to 15 02 25 29 26 d’anacardiers par les markets tronçonneurs dans le cadre du programme des Opérateurs Professionnels du Cajou (OPCA) CI-FIRCA-126715-CS-CDS / Recruter un Cabinet pour 1. Institutional le renforcement du Système 2019-08- 2019-10- 2019-09- 2019-10- 2019-11- 2019-12- 2020-05- IBRD / 88450 strengthening and value Post Direct Selection Direct 60,000.00 75,907.95 Signed Informatisé de 30 15 09 23 13 13 11 chain governance Commercialisation extérieur dans le cadre du SYSPER CI-FIRCA-126723-CS-CDS 3. Support to private / Sélection d'un Consultant investment in post-harvest 2019-09- 2019-10- 2019-09- 2019-11- 2019-09- 2020-01- 2019-09- pour l'accompagnement des IBRD / 88450 Post Direct Selection 60,000.00 40,140.02 Signed and processing 15 17 15 01 15 16 15 unités de décorticage dans infrastructure la mise en oeuvre des BPF et BPH CI-FIRCA-126736-CS-CDS / Sélection d’un consultant pour installer le LOGISCOOP 1. Institutional 2019-08- 2019-11- 2019-08- 2019-12- 2019-10- 2020-02- 2020-04- dans 30 nouvelles SCOOP IBRD / 88450 strengthening and value Post Direct Selection Direct 97,000.00 77,371.99 Signed 16 26 26 05 30 07 27 les former à son utilisation chain governance et assurer le suivi post- formation CI-FIRCA-126842-CS-CDS / Sélection d’un consultant pour la réalisation de 2. Productivity la mission d’audit et de enhancement and 2019-08- 2019-08- 2019-08- 2019-08- 2019-10- 2019-08- 2020-04- IBRD / 88450 Post Direct Selection Direct 28,000.00 30,407.71 Signed contrôle des pépinières improved access to 15 15 25 20 29 23 26 de production des plants markets greffes d’anacardier au titre de la campagne 2019 CI-FIRCA-126872-CS-CDS / Sélection d'un cabinet pour le diagnostic global et 3. Support to private évaluation des capacités investment in post-harvest 2019-08- 2018-11- 2019-08- 2018-12- 2019-10- 2018-12- 2020-04- 2019-12- techniques et financières IBRD / 88450 Post Direct Selection Direct 230,000.00 258,856.95 Completed and processing 10 01 20 04 24 21 21 18 des entreprises de infrastructure transformation de l’anacarde et élaboration d’un plan de mise à niveau du PPCA CI-FIRCA-140337-CS-CDS / Contrat en Entente Directe de la Direction Régionale CENTRE-EST de l’ANADER 2. Productivity pour la gestion des travaux enhancement and 2019-10- 2021-04- 2019-10- 2019-10- 2019-10- de réhabilitation des IBRD / 88450 Post Direct Selection 392,000.00 0.00 Under Review improved access to 15 02 15 15 15 vergers d’anacardiers par markets les tronçonneurs dans le cadre du programme des Opérateurs Professionnels du Cajou (OPCA) CI-FIRCA-140595-CS-CDS / Contrat par entente 2. Productivity directe avec le CIRES de enhancement and Under 2019-10- 2020-07- 2019-11- 2020-10- 2020-01- 2020-07- IBRD / 88450 Post Direct Selection Direct 112,000.00 0.00 l'UFHB pour la réalisation du improved access to Implementation 23 21 02 21 06 04 compte d'exploitation du markets producteur de l'anacarde. CI-FIRCA-126710-CS-CDS 3. Support to private / Sélection d’un Consultant investment in post-harvest 2019-09- 2019-09- 2019-11- 2020-05- pour l’accompagnement des IBRD / 88450 Post Direct Selection Direct 60,000.00 0.00 Canceled and processing 16 26 30 28 unités de décorticage dans infrastructure la mise en œuvre des BPF et BPH CI-FIRCA-106175-CS-CDS / Sélection par entente 1. Institutional directe du cabinet 3D 2019-07- 2019-07- 2019-09- 2020-03- IBRD / 88450 strengthening and value Post Direct Selection Direct 97,000.00 0.00 Canceled solution pour la poursuite 01 11 14 12 chain governance de l'installation du LOGISCOOP dans de nouvelles SCOOP CI-FIRCA-106586-CS- 2. Productivity Individual INDV / Sélection d'un enhancement and 2019-06- 2019-07- 2019-07- 2019-08- 2020-02- IBRD / 88450 Post Consultant Limited 38,000.00 0.00 Canceled consultant individuel pour improved access to 28 03 24 28 24 Selection réaliser les PAR des sites du markets PAVA. CI-FIRCA-126673-CS-CDS / Sélection d’un consultant pour installer le LOGISCOOP 1. Institutional 2019-08- 2019-08- 2019-10- 2020-04- dans 30 nouvelles SCOOP IBRD / 88450 strengthening and value Post Direct Selection Direct 97,000.00 0.00 Canceled 16 26 30 27 les former à son utilisation chain governance et assurer le suivi post- formation CI-FIRCA-126734-CS-CDS / Sélection d’un consultant 2. Productivity pour installer le LOGISCOOP enhancement and 2019-08- 2019-08- 2019-10- 2020-04- dans 30 nouvelles SCOOP IBRD / 88450 Post Direct Selection Direct 97,000.00 0.00 Canceled improved access to 16 26 30 27 les former à son utilisation markets et assurer le suivi post- formation CI-FIRCA-74758-CS-INDV / Recrutement de 4. Program coordination, Individual 2018-10- 2018-11- 2018-10- 2018-11- 2018-12- 2019-06- Consultants pour le IBRD / 88450 monitoring and knowledge Post Consultant Limited 40,000.00 0.00 Canceled 25 21 30 20 25 23 démarrage des paper work management Selection mises en œuvre par le CCA CI-FIRCA-74844-CS-INDV / Recrutement d'un 1. Institutional Individual consultant pour définir le 2018-11- 2019-01- 2019-01- 2019-03- 2019-08- IBRD / 88450 strengthening and value Post Consultant Open 20,000.00 0.00 Canceled cadre identification et de 19 07 28 04 31 chain governance Selection géo référencement des acteurs de la filière anacarde CI-FIRCA-106886-CS- 2. Productivity Individual INDV / Sélection d' un enhancement and 2019-05- 2019-05- 2019-06- 2019-07- 2020-01- IBRD / 88450 Post Consultant Limited 35,000.00 0.00 Canceled consultant pour la improved access to 15 20 10 15 11 Selection réalisation du PAR du CDC markets de Goulia Kanasso CI-FIRCA-74803-CS-INDV 3. Support to private / Recrutement de Individual investment in post-harvest 2019-01- 2019-03- 2019-03- 2019-05- 2019-11- consultants pour la IBRD / 88450 Post Consultant Open 225,000.00 0.00 Canceled and processing 20 10 31 05 01 formation d'un pool Selection infrastructure d'experts sur le marchés de cajou CI-FIRCA-106485-CS- INDV / Sélection d'un 4. Program coordination, Individual consultant pour mettre en 2019-12- 2019-12- 2020-01- 2020-02- 2020-08- IBRD / 88450 monitoring and knowledge Post Consultant Limited 10,000.00 0.00 Canceled place une base de données 15 20 10 14 12 management Selection permettant de suivre les cas d'intoxication (2 régions) CI-FIRCA-74827-CS-INDV / Recrutement de 2 1. Institutional Individual 2018-10- 2018-10- 2018-11- 2018-12- 2019-06- consultants pour l'analyse IBRD / 88450 strengthening and value Post Consultant Limited 50,000.00 0.00 Canceled 18 23 13 18 16 technique et financière de la chain governance Selection viabilité des OPA CI-FIRCA-106604-CS- 2. Productivity INDV / Sélection d'un Individual enhancement and 2019-03- 2019-04- 2019-04- 2019-05- 2019-11- consultant pour la IBRD / 88450 Post Consultant Limited 35,000.00 0.00 Canceled improved access to 31 05 26 31 27 réalisation du PAR du CDC Selection markets de Bondoukou (Gontougo) CI-FIRCA-74806-CS-INDV / Recrutement d'un 3. Support to private Individual consultant pour investment in post-harvest 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- IBRD / 88450 Post Consultant Open 20,000.00 0.00 Canceled l'élaboration du manuel and processing 04 25 15 20 16 Selection d'exportateurs pour le infrastructure secteur du cajou (noix brutes, amandes, etc.) CI-FIRCA-82315-CS-INDV 3. Support to private / Recrutement d'un Individual investment in post-harvest 2018-11- 2018-12- 2018-12- 2019-01- 2019-07- consultant individuel pour IBRD / 88450 Post Consultant Limited 50,000.00 0.00 Canceled and processing 26 01 22 26 25 l'élaboration de PAR sur 100 Selection infrastructure km à Bondoukou CI-FIRCA-106880-CS- 2. Productivity INDV / Sélection d'un Individual enhancement and 2019-05- 2019-05- 2019-06- 2019-07- 2020-01- consultant individuel pour IBRD / 88450 Post Consultant Limited 35,000.00 0.00 Canceled improved access to 15 20 10 15 11 la réalisation du PAR du Selection markets CDC de Toumbokro CI-FIRCA-82268-CS-INDV / Recrutement de 4. Program coordination, Individual 2018-10- 2018-11- 2018-11- 2018-12- 2019-06- consultants individuels pour IBRD / 88450 monitoring and knowledge Post Consultant Limited 200,000.00 0.00 Canceled 30 04 25 30 28 les mesures de sauvegarde management Selection environnementales et sociales CI-FIRCA-82317-CS-INDV / Recrutement de deux 3. Support to private Individual consultants individuels pour investment in post-harvest 2018-11- 2019-01- 2019-02- 2019-03- 2019-09- IBRD / 88450 Post Consultant Open 100,000.00 0.00 Canceled l'appui à l'amélioration des and processing 27 15 05 12 08 Selection bonnes pratiques de infrastructure fabrication CI-FIRCA-106455-CS- 3. Support to private INDV / Sélection d'un Individual investment in post-harvest 2019-04- 2019-05- 2019-05- 2019-06- 2019-12- consultant individuel pour IBRD / 88450 Post Consultant Limited 47,000.00 0.00 Canceled and processing 30 05 26 30 27 le Screening Selection infrastructure environnemental des entrepôts CI-FIRCA-106456-CS- 3. Support to private Individual INDV / Sélection de investment in post-harvest 2019-04- 2019-05- 2019-05- 2019-06- 2019-12- IBRD / 88450 Post Consultant Limited 46,000.00 0.00 Canceled consultants pour réaliser and processing 30 05 26 30 27 Selection l'évaluation sociale des infrastructure entrepôts CI-FIRCA-74762-CS-INDV / Recrutement de 4. Program coordination, Individual consultants pour 2018-10- 2018-10- 2018-11- 2018-12- 2019-06- IBRD / 88450 monitoring and knowledge Post Consultant Limited 50,000.00 0.00 Canceled l'élaboration des termes de 18 23 13 18 16 management Selection référence des activités/spécifications techniques des fournitures CI-FIRCA-74848-CS-INDV / Recrutement de consultants individuels pour 2. Productivity la mission d'études sociales Individual enhancement and 2018-10- 2018-12- 2018-12- 2019-01- 2019-07- en vue de l'élaboration d'un IBRD / 88450 Post Consultant Open 96,000.00 0.00 Canceled improved access to 18 06 27 31 30 PAR concernant le second Selection markets programme de réhabilitation de par RC et RLTPC 250KM en route rurale CI-FIRCA-82232-CS-INDV 4. Program coordination, Individual 2018-10- 2018-12- 2018-12- 2019-02- 2019-08- / Recrutement d'un auditeur IBRD / 88450 monitoring and knowledge Post Consultant Open 84,000.00 0.00 Canceled 22 10 31 04 03 interne management Selection CI-FIRCA-106464-CS- INDV / Sélection d'un 4. Program coordination, Individual 2019-12- 2020-02- 2020-02- 2020-03- 2020-09- consultant individuel pour IBRD / 88450 monitoring and knowledge Post Consultant Open 38,000.00 0.00 Canceled 15 02 23 29 25 l'élaboration d'un guide de management Selection bonne pratique sanitaire et d'hygiène CI-FIRCA-106444-CS- 3. Support to private INDV / Recruter un Individual investment in post-harvest 2019-03- 2019-05- 2019-05- 2019-06- 2019-12- consultant pour la IBRD / 88450 Post Consultant Open 19,000.00 0.00 Canceled and processing 15 03 24 28 25 réalisation du PAR de la Selection infrastructure zone agro-industrielle de Bouaké CI-FIRCA-74774-CS-INDV 4. Program coordination, Individual / Recrutement de 2 2018-10- 2018-10- 2018-11- 2018-12- 2019-06- IBRD / 88450 monitoring and knowledge Post Consultant Limited 200,000.00 0.00 Canceled consultants pour la 11 16 06 11 09 management Selection promotion des investissements industriels Page 11 CI-FIRCA-82312-CS-INDV 3. Support to private / Recrutement de deux Individual investment in post-harvest 2018-10- 2018-12- 2019-01- 2019-02- 2019-08- consultants individuels pour IBRD / 88450 Post Consultant Open 100,000.00 0.00 Canceled and processing 30 18 08 12 11 l'appui à l'installation des Selection infrastructure unités industrielles CI-FIRCA-106894-CS- 2. Productivity Individual INDV / Sélection d'un enhancement and 2019-05- 2019-05- 2019-06- 2019-07- 2020-01- IBRD / 88450 Post Consultant Limited 35,000.00 0.00 Canceled consultant individuel pour improved access to 15 20 10 15 11 Selection la réalisation d'un PAR du markets CDC de Koro CI-FIRCA-74837-CS-INDV 3. Support to private / Recrutement de Individual investment in post-harvest 2018-10- 2018-12- 2018-12- 2019-01- 2019-07- consultants pour la mise en IBRD / 88450 Post Consultant Open 100,000.00 0.00 Canceled and processing 18 06 27 31 30 œuvre des activités de Selection infrastructure réhabilitation et de construction des entrepôts CI-FIRCA-82314-CS-INDV 3. Support to private / Recrutement d'un Individual investment in post-harvest 2018-11- 2019-01- 2019-01- 2019-02- 2019-08- consultant individuel pour IBRD / 88450 Post Consultant Open 30,000.00 0.00 Canceled and processing 15 03 24 28 27 l'élaboration de PAR sur 60 Selection infrastructure km à Bondoukou CI-FIRCA-106154-CS-CDS / Sélection par entente 1. Institutional directe du cabinet COOP 2019-03- 2019-04- 2019-06- 2019-12- IBRD / 88450 strengthening and value Post Direct Selection Direct 56,000.00 0.00 Canceled France pour former les 22 01 05 02 chain governance acteurs sur les modules de gouvernance des sociétés CI-FIRCA-74828-CS-CDS / Recrutement d'un 4. Program coordination, 2019-02- 2019-02- 2019-02- 2019-02- consultant pour l'extension IBRD / 88450 monitoring and knowledge Post Direct Selection Direct - National 75,000.00 0.00 Canceled 21 21 21 21 du système informatisé de management suivi-évaluation. CI-FIRCA-106588-CS-CDS / Convention avec l'AFOR 2. Productivity pour le processus de enhancement and 2019-07- 2019-07- 2019-09- 2020-03- IBRD / 88450 Post Direct Selection Direct 75,000.00 0.00 Canceled délivrance des certificats improved access to 15 25 28 26 fonciers sur les parcelles du markets PAVA (pour les villes ) CI-FIRCA-107773-CS-CDS 4. Program coordination, / Convention avec l'ANDE 2019-04- 2019-04- 2019-06- 2019-12- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 150,000.00 0.00 Canceled pour la validation des 15 25 29 26 management quatre études environnementales CI-FIRCA-106463-CS-CDS / Convention avec DPVCQ 4. Program coordination, pour développer une base 2019-06- 2019-07- 2019-09- 2020-03- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 10,000.00 0.00 Canceled de données avec des 30 10 13 11 management formats adéquats en collaboration avec La DPVQ CI-FIRCA-157277-CS- 2. Productivity Individual INDV / Recrutement de enhancement and 2020-05- 2020-06- 2020-07- 2020-08- 2020-08- 2020-08- 2020-09- 2020-08- 2021-03- 2020-12- IBRD / 88450 Post Consultant Open 74,000.00 41,942.90 Completed consultants pour réaliser le improved access to 31 15 19 13 09 20 13 28 12 28 Selection suivi des activités du PNRA markets CI-FIRCA-157283-CS-CDS / Recrutement d'un 2. Productivity consultant pour la enhancement and Pending 2020-03- 2020-04- 2020-06- 2020-12- IBRD / 88450 Post Direct Selection Direct 250,000.00 0.00 réalisation des études socio- improved access to Implementation 31 10 14 11 économiques des markets innovations et autres activités de la Filière Anacarde CI-FIRCA-157300-CS- INDV / Recrutement d'un 2. Productivity Individual consultant pour le enhancement and Pending 2020-02- 2020-02- 2020-03- 2020-04- 2020-10- IBRD / 88450 Post Consultant Direct 19,000.00 0.00 renforcement des capacités improved access to Implementation 12 22 14 18 15 Selection des chercheurs et des markets autres acteurs de la Filière en hybridation CI-FIRCA-157330-CS-CDS / Sélection par entente 2. Productivity directe d'un cabinet pour la enhancement and Under 2020-05- 2020-06- 2020-06- 2020-08- 2021-02- poursuite de l'appui à la IBRD / 88450 Post Direct Selection Direct 75,000.00 0.00 improved access to Implementation 31 30 10 14 10 mise en oeuvre du markets programme des Opérateurs Professionnels du Cajou (OPCA) CI-FIRCA-157339-CS-CDS 2. Productivity / Convention avec l'ANADER enhancement and Pending 2020-02- 2020-03- 2020-05- 2020-11- IBRD / 88450 Prior Direct Selection Direct 1,993,000.00 0.00 pour le Conseil Agricole improved access to Implementation 28 09 13 09 dédié à l'anacarde markets CI-FIRCA-157341-CS-CDS 2. Productivity / Convention avec l'ANADER enhancement and 2020-02- 2020-04- 2020-03- 2020-06- 2020-05- 2020-09- 2020-11- IBRD / 88450 Post Direct Selection Direct 271,000.00 296,080.22 Signed pour la mise en œuvre de la improved access to 20 17 01 23 05 21 01 E-extension markets CI-FIRCA-157344-CS- INDV / Recrutement de 2. Productivity consultants pour la Individual enhancement and Pending 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- réalisation de deux (2) IBRD / 88450 Post Consultant Open 94,000.00 0.00 improved access to Implementation 31 19 09 14 10 missions de suivi et Selection markets d'évaluation interne des activités du Conseil Agricole dédié à l'Anacarde (CAA) 2019 CI-FIRCA-157343-CS- INDV / Recrutement de 2. Productivity consultants pour la Individual enhancement and 2020-02- 2020-03- 2020-02- 2020-05- 2020-03- 2020-06- 2020-04- 2020-07- 2020-10- formation des pépiniéristes IBRD / 88450 Post Consultant Limited 19,000.00 10,811.56 Signed improved access to 19 30 24 15 16 12 20 03 17 et greffeurs sur les Selection markets bioagresseurs, les méthodes de lutte et de sécurité sanitaire CI-FIRCA-157345-CS-CDS / Sélection par Entente Directe de la DR NORD 2. Productivity ANADER pour le suivi, le enhancement and 2020-03- 2020-04- 2020-03- 2020-05- 2020-05- 2020-09- 2020-11- IBRD / 88450 Post Direct Selection Direct 93,000.00 115,176.67 Signed contrôle et la validation des improved access to 16 23 26 19 30 18 26 travaux de réhabilitation markets des vergers d'anacardiers à réaliser par les OPCA CI-FIRCA-157346-CS-CDS / Recrutement d'un cabinet 2. Productivity pour la formation des enhancement and 2020-03- 2020-08- 2020-04- 2020-07- 2020-06- 2020-12- 2020-12- IBRD / 88450 Post Direct Selection Direct 28,000.00 63,314.92 Signed applicateurs des OPCA à la improved access to 31 02 10 09 14 11 11 maitrise de la manipulation markets et l'utilisation des produits phytosanitaires CI-FIRCA-157352-CS-CDS / Sélection par Entente Directe de la DR CENTRE 2. Productivity ANADER pour le suivi, le enhancement and 2020-03- 2020-04- 2020-03- 2020-05- 2020-05- 2020-09- 2020-11- IBRD / 88450 Post Direct Selection Direct 77,000.00 85,361.81 Signed contrôle et la validation des improved access to 16 23 26 25 30 18 26 travaux de réhabilitation markets des vergers d'anacardiers à réaliser par les OPCA CI-FIRCA-157358-CS-CDS / Sélection par Entente Directe de la DR Centre-Est 2. Productivity ANADER pour le suivi, le enhancement and 2020-03- 2020-04- 2020-03- 2020-05- 2020-05- 2020-09- 2020-11- IBRD / 88450 Post Direct Selection Direct 48,000.00 59,987.85 Signed contrôle et la validation des improved access to 16 23 26 19 30 18 26 travaux de réhabilitation markets des vergers d'anacardiers à réaliser par les OPCA CI-FIRCA-157360-CS-CDS / Sélection par Entente Directe de la DR Centre- 2. Productivity Ouest ANADER pour le suivi, enhancement and 2020-03- 2020-04- 2020-03- 2020-05- 2020-05- 2020-09- 2020-11- IBRD / 88450 Post Direct Selection Direct 36,000.00 44,600.00 Signed le contrôle et la validation improved access to 16 23 26 19 30 18 26 des travaux de markets réhabilitation des vergers d'anacardiers à réaliser par les OPCA CI-FIRCA-157363-CS-CDS / Sélection par Entente Directe de la DR OUEST 2. Productivity ANADER pour le suivi, le enhancement and 2020-03- 2020-04- 2020-03- 2020-05- 2020-05- 2020-09- 2020-11- IBRD / 88450 Post Direct Selection Direct 19,000.00 24,045.58 Signed contrôle et la validation des improved access to 16 23 26 25 30 18 26 travaux de réhabilitation markets des vergers d'anacardiers à réaliser par les OPCA CI-FIRCA-157367-CS-CDS / Sélection par Entente 2. Productivity Directe de la SODEXAM pour enhancement and Under 2020-02- 2020-05- 2020-03- 2020-05- 2020-11- apporter un appui à la mise IBRD / 88450 Post Direct Selection Direct 151,000.00 0.00 improved access to Implementation 29 20 10 14 10 en œuvre des activités de markets résilience des producteurs d'anacarde au changement climatique CI-FIRCA-157372-CS- 2. Productivity INDV / Recrutement d'un Individual enhancement and Pending 2020-02- 2020-04- 2020-04- 2020-06- 2020-11- consultant pour le suivi et le IBRD / 88450 Post Consultant Open 6,000.00 0.00 improved access to Implementation 17 06 27 01 28 contrôle des travaux Selection markets d'aménagement du laboratoire de pédologie CI-FIRCA-157374-CS- INDV / Recruter cinq consultants individuels pour preparation de Plans 2. Productivity d’Action de Reinstallation Individual enhancement and 2020-02- 2020-03- 2020-04- 2020-06- 2020-05- 2020-06- 2020-06- 2020-07- 2020-12- (PAR) relatifs aux travaux de IBRD / 88450 Post Consultant Open 139,000.00 136,894.66 Signed improved access to 25 09 14 03 05 15 09 03 06 Rehabilitation en reprofilage Selection markets Lourd avec Traitement de Points Critiques (RLTPC) de 349 km de routes rurales dans les regions du Gonto CI-FIRCA-157546-CS- 3. Support to private INDV / Recrutement d'un Individual investment in post-harvest Under 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- consultant individuel pour IBRD / 88450 Post Consultant Open 4,000.00 0.00 and processing Implementation 05 30 23 14 18 15 l'accompagnement social Selection infrastructure des PAPs de la ZAI de Bondoukou CI-FIRCA-157571-CS-CDS 3. Support to private / Sélection d'un consultant investment in post-harvest 2020-04- 2020-05- 2020-05- 2020-05- 2020-07- 2020-06- 2021-01- par entente directe pour IBRD / 88450 Post Direct Selection Direct 75,000.00 53,239.65 Signed and processing 28 11 08 14 12 15 08 l'assistance à la promotion infrastructure des investissements CI-FIRCA-157573-CS- 4. Program coordination, Individual INDV / Recruter un 2020-02- 2020-01- 2020-04- 2020-03- 2020-04- 2020-04- 2020-06- 2020-04- 2020-12- IBRD / 88450 monitoring and knowledge Post Consultant Open 78,000.00 47,151.05 Signed consultant individuel en 20 06 09 24 30 08 04 30 01 management Selection mesure de Sauvegarde Environnementale CI-FIRCA-157582-CS-CDS / Recrutement de 4. Program coordination, 2020-03- 2020-03- 2020-04- 2020-04- 2020-06- 2020-05- 2020-12- Consultant pour IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 56,000.00 55,016.70 Signed 31 31 10 21 14 04 11 l'élaboration de la stratégie management de communication du PPCA CI-FIRCA-157931-CS-CDS 3. Support to private / Sélection par entente investment in post-harvest Under 2020-03- 2020-08- 2020-03- 2020-10- 2020-05- 2020-11- directe d'une firme pour IBRD / 88450 Post Direct Selection Direct 38,000.00 38,849.78 and processing Implementation 02 26 12 21 16 12 actualiser les modèles infrastructure économiques de la transformation de l'anacarde CI-FIRCA-157932-CS-CDS / Convention avec l'IECD 1. Institutional pour la mise en œuvre Under 2020-02- 2020-10- 2020-03- 2020-05- 2020-11- IBRD / 88450 strengthening and value Post Direct Selection Direct 466,000.00 0.00 d'un centre d'incubation Implementation 26 26 07 11 07 chain governance pour le développement de produits dérivés de l'anacarde CI-FIRCA-158118-CS-CDS / Sélection de l'ESA pour 1. Institutional appuyer l'élaboration et le Under 2020-03- 2020-09- 2020-03- 2020-10- 2020-05- 2020-11- IBRD / 88450 strengthening and value Post Direct Selection Direct 372,000.00 0.00 suivi de la mise en œuvre Implementation 02 04 12 21 16 12 chain governance des plans de développement des sociétés coopératives CI-FIRCA-106483-CS- 4. Program coordination, Individual INDV / Sélection d'un 2020-03- 2020-03- 2020-04- 2020-05- 2020-11- IBRD / 88450 monitoring and knowledge Post Consultant Limited 10,000.00 0.00 Canceled consultant pour le Plan 20 25 15 20 16 management Selection d'amélioration des performances CI-FIRCA-158217-CS- INDV / Recrutement d'un consultant individuel pour 1. Institutional Individual 2020-03- 2021-06- 2020-05- 2020-05- 2020-06- 2020-12- l'élaboration de la IBRD / 88450 strengthening and value Post Consultant Open 47,000.00 0.00 Under Review 16 21 04 25 29 26 procédure de traitement chain governance Selection phytosanitaire des noix de cajou et d'agrément des applicateurs CI-FIRCA-158938-CS- INDV / Recrutement d'un consultant individuel pour 3. Support to private Individual la modélisation en 3 investment in post-harvest 2020-02- 2020-03- 2020-03- 2020-07- 2020-03- 2020-09- 2020-04- 2020-09- 2020-10- 2020-12- IBRD / 88450 Post Consultant Limited 19,000.00 18,641.11 Completed Dimensions et la réalisation and processing 28 09 04 30 25 09 29 24 26 02 Selection d'une vidéo de synthèse infrastructure (film d'animation) de la plateforme agro industrielle de Korhogo CI-FIRCA-126727-CS- 2. Productivity INDV / Recruter 2 Individual enhancement and Under 2020-03- 2020-11- 2020-04- 2020-04- 2020-05- 2020-11- consultants pour apporter IBRD / 88450 Post Consultant Limited 19,000.00 0.00 improved access to Implementation 31 04 05 26 31 27 un appui à la relecture du Selection markets document du PNRA CI-FIRCA-106560-CS- INDV / Recrutement d'un 1. Institutional Individual Assistant Spécialiste en Pending 2020-05- 2020-06- 2020-07- 2020-08- 2021-02- IBRD / 88450 strengthening and value Post Consultant Open 22,000.00 0.00 Social pour l'appui à la mise Implementation 01 19 10 14 10 chain governance Selection en œuvre des mesures de sauvegarde sociales. CI-FIRCA-106454-CS- INDV / Sélection d'un 3. Support to private Individual consultant individuel pour investment in post-harvest 2019-05- 2019-06- 2019-06- 2019-07- 2020-01- IBRD / 88450 Post Consultant Limited 56,000.00 0.00 Canceled concevoir des supports de and processing 30 04 25 30 26 Selection communication sur les infrastructure mécanismes de financement à coûts partagés CI-FIRCA-126729-CS- 2. Productivity Individual INDV / Sélection d’un enhancement and 2019-10- 2019-11- 2019-11- 2019-12- 2020-06- IBRD / 88450 Post Consultant Limited 38,000.00 0.00 Canceled consultant individuel pour improved access to 30 04 25 30 27 Selection Réaliser les PAR des sites du markets PAVA CI-FIRCA-106607-CS- 2. Productivity INDV / Sélection d'un Individual enhancement and 2019-04- 2019-04- 2019-05- 2019-06- 2019-12- consultant pour la IBRD / 88450 Post Consultant Limited 35,000.00 0.00 Canceled improved access to 15 20 11 15 12 réalisation du PAR d'un Selection markets CDC de BOUNA (Bounkani). CI-FIRCA-106873-CS- 2. Productivity Individual INDV / Sélection d'un enhancement and 2019-03- 2019-04- 2019-04- 2019-05- 2019-11- IBRD / 88450 Post Consultant Limited 35,000.00 0.00 Canceled consultant pour la improved access to 31 05 26 31 27 Selection réalisation du PAR du CDC markets de Dabakala (Hambol) CI-FIRCA-106892-CS- 2. Productivity Individual INDV / Sélection d'un enhancement and 2019-05- 2019-05- 2019-06- 2019-07- 2020-01- IBRD / 88450 Post Consultant Limited 35,000.00 0.00 Canceled consultant individuel pour improved access to 15 20 10 15 11 Selection la réalisation du PAR du markets CDC de Wongué CI-FIRCA-126691-CS- 1. Institutional Individual INDV / Recrutement d'un 2019-09- 2019-09- 2019-10- 2019-11- 2020-05- IBRD / 88450 strengthening and value Post Consultant Limited 30,000.00 0.00 Canceled consultant pour 16 21 12 16 14 chain governance Selection l'actualisation du CGES CI-FIRCA-126697-CS-CDS / Recrutement d’un 3. Support to private Consultant pour l’étude investment in post-harvest 2019-09- 2019-10- 2019-12- 2020-06- IBRD / 88450 Post Direct Selection Direct 94,000.00 0.00 Canceled technique de centres de and processing 30 10 14 11 valorisation des sous- infrastructure produits Anacarde en lien avec les ZAI CI-FIRCA-106867-CS-CDS 2. Productivity / Convention avec les OPCA enhancement and 2019-04- 2019-05- 2019-07- 2020-01- pour l'acquisition des IBRD / 88450 Post Direct Selection Direct 466,000.00 0.00 Canceled improved access to 30 10 14 10 équipements techniques markets d'installation des OPCA CI-FIRCA-106667-CS- 2. Productivity INDV / Sélection de Individual enhancement and 2019-06- 2019-07- 2019-07- 2019-08- 2020-02- consultant s individuels IBRD / 88450 Post Consultant Limited 187,000.00 0.00 Canceled improved access to 28 03 24 28 24 pour réaliser les études des Selection markets PAR des 448 Km à réhabiliter et à construire . Page 12 CI-FIRCA-126728-CS-CDS 2. Productivity / Recrutement d’un enhancement and Pending 2019-09- 2019-09- 2019-11- 2020-05- consultant pour réaliser une IBRD / 88450 Post Direct Selection Direct 47,000.00 0.00 improved access to Implementation 15 25 29 27 mission d'audit technique markets des stations agro-météo installées CI-FIRCA-157305-CS-CDS / Sélection par entente directe de firmes pour la 2. Productivity réalisation des activités enhancement and Pending 2020-02- 2020-02- 2020-04- 2020-10- IBRD / 88450 Post Direct Selection Direct 94,000.00 0.00 d'obtention des Certificats improved access to Implementation 12 22 27 24 Fonciers (CF) au profit des markets propriétaires coutumiers des CDC en création et des sites du PAVA CI-FIRCA-157249-CS-CDS / Sélection par entente d'un 2. Productivity consultant pour réaliser les enhancement and 2020-05- 2020-06- 2020-06- 2020-07- 2020-08- 2020-06- 2021-02- activités de la Coordination IBRD / 88450 Post Direct Selection Direct 64,000.00 35,576.45 Signed improved access to 31 30 10 13 14 05 10 Scientifique (CS) du PNRA markets (prestations,fonctionnement et missions) CI-FIRCA-126661-CS-CDS / Entente directe avec l'association Technologies & 1. Institutional Pending 2020-06- 2020-06- 2020-08- 2021-02- Solidarité de France pour IBRD / 88450 strengthening and value Post Direct Selection Direct 56,000.00 0.00 Implementation 10 20 24 20 l'organisation de missions chain governance d'appui aux sociétés coopératives CI-FIRCA-167249-CS-CDS / Entente directe avec KPMG 1. Institutional 2020-04- 2020-05- 2020-04- 2020-04- 2020-06- 2020-06- 2020-12- pour l’opérationnalisation IBRD / 88450 strengthening and value Post Direct Selection Direct 250,000.00 243,633.15 Signed 08 25 18 14 22 18 19 de la fonction d’audit au chain governance sein du CCA CI-FIRCA-167375-CS- INDV / RECRUTEMENT D'UN 1. Institutional Individual INFORMATICIEN POUR LE 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-06- 2020-04- 2020-12- IBRD / 88450 strengthening and value Post Consultant Limited 32,000.00 23,839.97 Signed RENFORCEMENT DES 08 07 13 16 04 28 08 30 05 chain governance Selection CAPACITES DE LA DSIPE A L'ANNEXE 2 DU CCA CI-FIRCA-180001-CS- INDV / SELECTION D'UN CONSULTANT INDIVIDUEL 1. Institutional Individual 2020-06- 2020-10- 2020-08- 2020-08- 2020-10- 2021-04- POUR L'ACCOMPAGNEMENT IBRD / 88450 strengthening and value Post Consultant Open 13,000.00 0.00 Canceled 22 07 10 31 05 03 DU CITA POUR LA MISE EN chain governance Selection PLACE DE LA MATRICE DES PRIX CI-FIRCA-180135-CS- 4. Program coordination, Individual INDV / RECRUTEMENT DE Under 2020-06- 2020-08- 2020-07- 2020-08- 2020-11- 2020-10- 2021-03- IBRD / 88450 monitoring and knowledge Prior Consultant Open 92,000.00 0.00 DEUX SPECIALISTES EN Implementation 19 07 03 28 19 02 31 management Selection PASSATION DE MARCHES POUR LE PPCA CI-FIRCA-180147-CS-CDS 2. Productivity / Recrutement de huit enhancement and Pending 2020-06- 2020-06- 2020-09- 2021-03- pépiniéristes expérimentés IBRD / 88450 Post Direct Selection Direct 8,000.00 0.00 improved access to Implementation 19 29 02 01 pour la formation des OPCA markets aux techniques de greffage CI-FIRCA-180150-CS- 2. Productivity INDV / RÉALISATION D'UN Individual enhancement and 2020-06- 2021-02- 2020-06- 2019-10- 2020-07- 2019-10- 2020-08- 2019-12- 2021-02- PLAN D'ACTION DE IBRD / 88450 Post Consultant Limited 35,000.00 39,231.76 Signed improved access to 19 25 24 11 15 28 19 13 15 RÉINSTALLATION (PAR) DE Selection markets SANANKORO CI-FIRCA-167384-CS- INDV / RECRUTEMENT D'UN ASSISTANT SPECIALISTE EN 1. Institutional Individual SAUVEGARDE Under 2020-06- 2020-06- 2020-06- 2020-07- 2020-08- 2021-02- IBRD / 88450 strengthening and value Post Consultant Limited 23,000.00 0.00 ENVIRONNEMENTALE POUR Implementation 24 17 29 20 24 20 chain governance Selection L'APPUI A LA MISE EN OEUVRE DES MESURES DE SAUVEGARDE ENVIRONNEMENTALE CI-FIRCA-180143-CS- INDV / RECRUTEMENT D'UN 4. Program coordination, Individual Pending 2020-06- 2020-08- 2020-08- 2020-10- 2021-03- RESPONSABLE COMPTABLE IBRD / 88450 monitoring and knowledge Post Consultant Open 75,000.00 0.00 Implementation 19 07 28 02 31 ET FINANCIER (RCF) POUR LE management Selection PPCA CI-FIRCA-180146-CS- 4. Program coordination, Individual Pending 2020-06- 2020-08- 2020-08- 2020-10- 2021-03- INDV / RECRUTEMENT DE IBRD / 88450 monitoring and knowledge Post Consultant Open 64,000.00 0.00 Implementation 19 07 28 02 31 DEUX COMPTABLES POUR LE management Selection PPCA CI-FIRCA-157262-CS- 2. Productivity Individual INDV / Recrutement d'un enhancement and 2020-03- 2020-04- 2020-04- 2020-05- 2020-11- IBRD / 88450 Post Consultant Limited 6,000.00 0.00 Canceled consultant pour la improved access to 31 05 26 31 27 Selection modération de l'atelier de markets relecture du PNRA CI-FIRCA-157369-CS- INDV / Recrutement d'un 2. Productivity consultant pour la Individual enhancement and 2020-11- 2020-09- 2020-11- 2020-10- 2020-12- 2020-11- 2021-01- 2020-11- 2021-07- formation des pépiniéristes IBRD / 88450 Post Consultant Limited 19,000.00 9,529.81 Signed improved access to 05 29 10 27 01 25 05 30 04 de la Filière Anacarde sur Selection markets les techniques de production des plants forestiers CI-FIRCA-126722-CS-CDS / Recrutement d’un 1. Institutional Individual 2020-03- 2020-03- 2020-03- 2020-05- 2020-10- consultant individuel pour IBRD / 88450 strengthening and value Post Consultant Limited 25,000.00 0.00 Canceled 02 07 28 02 29 l’étude portant sur la mise chain governance Selection en place d’un laboratoire central au CITA CI-FIRCA-157555-CS- INDV / Recrutement d'un 3. Support to private Individual consultant pour investment in post-harvest 2020-02- 2020-04- 2020-05- 2020-06- 2020-12- IBRD / 88450 Post Consultant Open 38,000.00 0.00 Canceled l'élaboration de la stratégie and processing 28 17 08 12 09 Selection nationale sur la plateforme infrastructure des équipementiers CI-FIRCA-201740-CS- INDV / Recruter un consultant individuel agréé par le Ministère en charge 1. Institutional Individual Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-07- de l'Environnement pour IBRD / 88450 strengthening and value Post Consultant Limited 12,000.00 0.00 Implementation 10 15 06 10 09 réaliser le Plan de Gestion chain governance Selection Environnementale - Audit (PGE-Audit) du CITA (audit réglementaire) CI-FIRCA-201801-CS-CDS / Recrutement de cinq consultants individuels pour la préparation de Plans 2. Productivity d'Action de Réinstallation Individual enhancement and 2020-11- 2021-02- 2021-01- 2021-01- 2021-02- 2021-08- (PAR) relatifs aux travaux de IBRD / 88450 Post Consultant Open 181,000.00 0.00 Under Review improved access to 15 09 03 24 28 27 Rehabilitation en reprofilage Selection markets Lourd avec Traitement de Points Critiques (RLTPC) de 370,5 km de routes rurales dans la régi CI-FIRCA-158220-CS- INDV / Recrutement d'un consultant individuel pour 1. Institutional Individual 2020-03- 2020-05- 2020-05- 2020-07- 2020-12- la mise en place des IBRD / 88450 strengthening and value Post Consultant Open 8,000.00 0.00 Canceled 20 08 29 03 30 plateformes de travail chain governance Selection collaboratif (gestion de courrier, espace collaboratif, archivage, médiathèque...) CI-FIRCA-158222-CS- INDV / Recrutement d'un 1. Institutional Individual consultant individuel pour 2020-04- 2020-05- 2020-06- 2020-07- 2021-01- IBRD / 88450 strengthening and value Post Consultant Open 19,000.00 0.00 Canceled l'élaboration d'un plan de 10 29 19 24 20 chain governance Selection formation des agents du Conseil du Coton et de l'Anacarde CI-FIRCA-201960-CS- INDV / Recruter un 1. Institutional Individual Pending 2020-11- 2020-11- 2020-11- 2021-01- 2021-07- consultant pour l'étude de IBRD / 88450 strengthening and value Post Consultant Limited 30,000.00 0.00 Implementation 02 07 28 02 01 dimensionnement d'une chain governance Selection unité de pirolyse au CITA CI-FIRCA-74834-CS-CQS / Recrutement de 1. Institutional Individual consultants pour la Pending 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 strengthening and value Post Consultant Open 50,000.00 0.00 formation de 100 Implementation 30 18 08 15 11 chain governance Selection techniciens des unités de transformation de noix de cajou CI-FIRCA-82297-CS-INDV / Recrutement d'un juriste pour l'élaboration et la 1. Institutional Individual 2020-11- 2020-11- 2020-12- 2021-01- 2021-07- finalisation des textes pour IBRD / 88450 strengthening and value Post Consultant Limited 25,000.00 0.00 Under Review 16 21 12 16 15 la constitution des collèges chain governance Selection des acheteurs, exportateurs et transformateurs CI-FIRCA-82587-CS-INDV 3. Support to private / Recrutement d'un Individual investment in post-harvest 2020-03- 2020-03- 2020-04- 2020-05- 2020-11- consultant individuel pour IBRD / 88450 Post Consultant Limited 30,000.00 0.00 Canceled and processing 19 24 14 19 15 la réalisation des études Selection infrastructure pour l'interconnexion des sites CI-FIRCA-157304-CS-CDS 2. Productivity / Recrutement d'une Individual enhancement and Pending 2020-12- 2020-12- 2020-12- 2021-01- 2021-07- structure spécialisée en IBRD / 88450 Post Consultant Limited 10,000.00 0.00 improved access to Implementation 01 06 27 31 30 organisation d'un e-forum Selection markets pour le CIESA 2020 CI-FIRCA-157331-CS- 2. Productivity INDV / Recrutement d'un Individual enhancement and 2020-11- 2020-12- 2020-12- 2021-01- 2021-07- consultant pour la IBRD / 88450 Post Consultant Limited 10,000.00 0.00 Canceled improved access to 30 05 26 30 29 modération des travaux de Selection markets l'atelier bilan des activités des pépiniéristes CI-FIRCA-157342-CS- INDV / Recrutement d'un 2. Productivity Individual consultant pour la enhancement and 2020-04- 2020-06- 2020-05- 2020-05- 2020-06- 2020-12- IBRD / 88450 Post Consultant Limited 10,000.00 0.00 Canceled modération des travaux de improved access to 30 15 05 26 30 27 Selection la revue semestrielle des markets activités du conseil agricole dédié CI-FIRCA-157355-CS- INDV / Recrutement d'un 2. Productivity Individual consultant pour la enhancement and 2020-09- 2020-10- 2020-10- 2020-11- 2021-05- IBRD / 88450 Post Consultant Limited 10,000.00 0.00 Canceled modération des travaux de improved access to 30 05 26 30 29 Selection l'atelier bilan de mise en markets œuvre du programme OPCA CI-FIRCA-157336-CS- 2. Productivity INDV / Recrutement d'un Individual enhancement and 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- consultant pour la IBRD / 88450 Post Consultant Open 24,000.00 0.00 Canceled improved access to 02 21 11 15 14 formation du personnel Selection markets technique des 3 CDC CI-FIRCA-201989-CS- INDV / Recrutement d'un 2. Productivity consultant en appui à Individual enhancement and Under 2020-11- 2020-11- 2020-11- 2020-12- 2021-01- 2021-07- l'organisation de l'atelier IBRD / 88450 Post Consultant Limited 4,000.00 0.00 improved access to Implementation 10 20 15 06 10 09 bilan des activités du Selection markets conseil agricole, de la réhabilitation et distribution des plants greffés CI-FIRCA-126732-CS- INDV / Recrutement de trois 2. Productivity Individual (3) techniciens pour le suivi enhancement and 2019-08- 2019-09- 2019-09- 2019-10- 2020-04- IBRD / 88450 Post Consultant Limited 30,000.00 0.00 Canceled des essais de recherche sur improved access to 30 05 26 31 28 Selection les sites de Badikaha, markets Koflandé et de KORO Sanankoro CI-FIRCA-157548-CS- 3. Support to private INDV / Recrutement d'un Individual investment in post-harvest 2020-12- 2021-02- 2021-03- 2021-04- 2021-10- consultant individuel pour IBRD / 88450 Post Consultant Open 4,000.00 0.00 Canceled and processing 23 10 03 07 04 l'accompagnement social Selection infrastructure des PAPs de la ZAI de Séguéla CI-FIRCA-157559-CS- INDV / Recrutement d'un 3. Support to private consultant pour Individual investment in post-harvest 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- l'élaboration des documents IBRD / 88450 Post Consultant Open 30,000.00 0.00 Canceled and processing 29 17 07 12 08 relatifs aux plateformes de Selection infrastructure services de la filière anacarde en Côte d’Ivoire CI-FIRCA-158119-CS-CDS / entente directe avec 3. Support to private l'ADCI pour l'évaluation des investment in post-harvest 2020-03- 2020-03- 2020-05- 2020-11- IBRD / 88450 Post Direct Selection Direct 432,000.00 0.00 Canceled capacités techniques et and processing 02 12 16 12 financieres des entreprises infrastructure de transformation de cajou CI-FIRCA-74794-CS-CDS / 3. Support to private 2020-03- 2020-04- 2020-06- 2020-12- Convention avec le BNETD IBRD / 88450 investment in post-harvest Post Direct Selection Direct 200,000.00 0.00 Canceled 30 09 13 10 dans le cadre de l'AMO and processing infrastructure CI-FIRCA-157577-CS- INDV / Recrutement d'un 4. Program coordination, Individual consultant assistant pour 2020-02- 2020-04- 2020-05- 2020-06- 2020-12- IBRD / 88450 monitoring and knowledge Post Consultant Open 16,000.00 0.00 Canceled assurer le suivi des activités 28 17 08 12 09 management Selection et l'actualisation du système informatisé de suivi- évaluation CI-FIRCA-157366-CS- INDV / Recrutement d'un consultant pour identifier les techniques et 2. Productivity Individual technologies ainsi que les enhancement and Under 2021-03- 2020-11- 2021-03- 2021-04- 2021-05- 2021-11- IBRD / 88450 Post Consultant Limited 10,000.00 0.00 produits de valorisation des improved access to Implementation 21 15 26 16 21 17 Selection sous-produits de la markets réhabilitation des vergers d'anacarde et proposer un plan de renforcement des capacités des bénéficiaires CI-FIRCA-157553-CS- INDV / Recrutement d'un 3. Support to private Individual consultant individuel pour investment in post-harvest Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-07- IBRD / 88450 Post Consultant Limited 100,000.00 0.00 la réalisation de l'étude and processing Implementation 05 10 01 05 04 Selection pour la définition du mode infrastructure de gestion des zones agro- industrielles CI-FIRCA-157558-CS- INDV / Recruter une firme 3. Support to private pour renforcer les capacités Individual investment in post-harvest Pending 2020-02- 2020-04- 2020-05- 2020-06- 2020-12- techniques de 12 IBRD / 88450 Post Consultant Open 18,000.00 0.00 and processing Implementation 28 17 08 12 09 entreprises en promotion Selection infrastructure sur lieu de vente (PLV) et en Marketing-Management CI-FIRCA-202096-CS- INDV / Recruter un 3. Support to private consultant pour renforcer Individual investment in post-harvest Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-07- les capacités techniques de IBRD / 88450 Post Consultant Limited 18,000.00 0.00 and processing Implementation 05 10 01 05 04 12 entreprises en Selection infrastructure promotion sur lieu de vente (PLV) et en Marketing- Management CI-FIRCA-157560-CS- INDV / Recrutement de 3. Support to private Individual consultants individuels pour investment in post-harvest Pending 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- IBRD / 88450 Post Consultant Open 187,000.00 0.00 l’accompagnement des and processing Implementation 01 22 12 17 13 Selection unités de transformation infrastructure dans une démarche qualité CI-FIRCA-106460-CS- 3. Support to private Individual INDV / Recrutement de investment in post-harvest Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Consultant Limited 93,000.00 0.00 consultants individuels pour and processing Implementation 15 20 10 17 13 Selection réaliser les études de PAR infrastructure des entrepôts CI-FIRCA-106459-CS- 3. Support to private Individual INDV / Recrutement d'un investment in post-harvest Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Consultant Limited 187,000.00 0.00 cabinet pour réaliser les and processing Implementation 15 20 10 17 13 Selection EIES / CIES des entrepôts infrastructure CI-FIRCA-202097-CS- INDV / Recrutement d'un 3. Support to private Consultant pour l'évaluation Individual investment in post-harvest Under 2020-11- 2020-11- 2020-12- 2020-12- 2021-01- 2021-07- de la phase pilote IBRD / 88450 Post Consultant Limited 28,000.00 0.00 and processing Implementation 30 15 05 26 30 29 d'installation de kits de Selection infrastructure décorticage de noix au sein des sociétés coopératives Page 13 CI-FIRCA-157575-CS- INDV / Recrutement d'un 4. Program coordination, Individual consultant individuel en vue Pending 2021-02- 2021-04- 2021-04- 2021-05- 2021-11- IBRD / 88450 monitoring and knowledge Post Consultant Open 37,000.00 0.00 d'élaborer un plan d'action Implementation 15 05 26 31 27 management Selection pour le renforcement des actions de prises en compte du genre CI-FIRCA-158939-CS- INDV / Recrutement de 4. Program coordination, Individual Pending 2021-01- 2021-03- 2021-03- 2021-04- 2021-10- consultants pour la mise en IBRD / 88450 monitoring and knowledge Post Consultant Open 56,000.00 0.00 Implementation 15 05 26 30 27 oeuvre des activités de management Selection sensibilisation sur le MGP CI-FIRCA-126686-CS- INDV / Recrutement de 4. Program coordination, Individual Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-09- consultants junior en appui IBRD / 88450 monitoring and knowledge Post Consultant Limited 40,000.00 0.00 Implementation 11 16 06 13 09 aux spécialistes pour la management Selection mise en oeuvre des activités CI-FIRCA-106484-CS- INDV / Sélection d'un consultant pour la 4. Program coordination, Individual Pending 2021-01- 2021-01- 2021-01- 2021-03- 2021-08- formation des agents de IBRD / 88450 monitoring and knowledge Post Consultant Limited 10,000.00 0.00 Implementation 01 06 27 03 30 santé des régions du projet management Selection sur la prise en charge des personnes intoxiquées aux pesticides. CI-FIRCA-202104-CS- 4. Program coordination, Individual Under 2020-11- 2021-05- 2020-11- 2020-12- 2021-01- 2021-07- INDV / Recrutement d'un IBRD / 88450 monitoring and knowledge Post Consultant Limited 20,000.00 0.00 Implementation 16 26 21 12 16 15 consultant infographe management Selection CI-FIRCA-202105-CS- 4. Program coordination, Individual INDV / Recrutement de Pending 2020-11- 2020-11- 2020-12- 2021-01- 2021-07- IBRD / 88450 monitoring and knowledge Post Consultant Limited 60,000.00 0.00 traducteurs et d'interprètes Implementation 20 25 16 20 19 management Selection (anglais, vietnamien) CI-FIRCA-158230-CS- INDV / Recruter un 1. Institutional Individual 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- consultant pour l'étude IBRD / 88450 strengthening and value Post Consultant Open 32,000.00 0.00 Canceled 30 18 08 13 09 relative à la construction de chain governance Selection l'entrepôt du CITA CI-FIRCA-74840-CS-CDS / 3. Support to private Convention complémentaire investment in post-harvest Pending 2020-11- 2020-12- 2021-02- 2021-08- avec des radios de IBRD / 88450 Post Direct Selection Direct 100,000.00 0.00 and processing Implementation 30 10 13 12 proximité (URPCI) pour la infrastructure promotion des activités du PPCA CI-FIRCA-203497-CS-CDS / Conception et réalisation 3. Support to private des études techniques du investment in post-harvest Under 2020-12- 2020-11- 2020-12- 2021-02- 2021-08- IBRD / 88450 Post Direct Selection Direct 224,000.00 0.00 centre de valorisation des and processing Implementation 01 15 11 14 13 coques de noix de cajou sur infrastructure la Zone Industrielle de Yamoussoukro CI-FIRCA-157580-CS- INDV / Recrutement de 4. Program coordination, Individual Pending 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- consultants individuels pour IBRD / 88450 monitoring and knowledge Post Consultant Open 38,000.00 0.00 Implementation 30 18 08 15 11 faciliter l'organisation des management Selection évaluations participatives de 2020 CI-FIRCA-74759-CS-CDS / Recrutement d'un consultant (M KAMA BERTE) 4. Program coordination, pour la formation de l'UCP 2020-03- 2020-04- 2020-06- 2020-12- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 10,000.00 0.00 Canceled et des autres acteurs de 30 09 13 10 management mise en œuvre sur le plan d'amélioration des performances CI-FIRCA-203516-CS- INDV / Recrutement d'un consultant individuel pour 4. Program coordination, Individual la formation de l'UCP et des Pending 2020-12- 2020-12- 2021-01- 2021-02- 2021-08- IBRD / 88450 monitoring and knowledge Post Consultant Limited 10,000.00 0.00 autres acteurs de mise en Implementation 14 19 09 13 12 management Selection œuvre, sur le plan d'amélioration des performances CI-FIRCA-203478-CS-CDS / Entente directe avec le 1. Institutional BNETD pour le Under 2020-11- 2021-03- 2020-12- 2021-02- 2021-08- IBRD / 88450 strengthening and value Post Direct Selection Direct 102,000.00 0.00 renforcement du dispositif Implementation 27 09 07 10 09 chain governance de collecte et de traitement des données du SYSPER CI-FIRCA-203506-CS-CDS / Recrutement d'un consultant pour la 3. Support to private Individual modélisation en 3 investment in post-harvest Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 Post Consultant Limited 40,000.00 0.00 Dimensions et la réalisation and processing Implementation 20 25 15 22 18 Selection d'une vidéo de synthèse infrastructure (film d'animation) des plateformes agro industrielles Bondoukou et Séguéla CI-FIRCA-203482-CS-CDS / Entente directe avec le cabinet Capacity Building Consultants Ltd pour 1. Institutional l'élaboration des documents Under 2020-11- 2021-03- 2020-12- 2021-02- 2021-08- IBRD / 88450 strengthening and value Post Direct Selection Direct 480,000.00 0.00 conceptuels du projet Implementation 27 09 07 10 09 chain governance portant sur la contribution de la filière anacarde à l'amélioration de l'empreinte carbone de la Côte d'Ivoire CI-FIRCA-203505-CS-CDS / Sélection d'un laboratoire pour la détermination des caractéristiques/paramètres 3. Support to private physico-chimiques (valeurs investment in post-harvest Pending 2020-11- 2020-12- 2021-02- 2021-08- IBRD / 88450 Post Direct Selection Direct 28,000.00 0.00 énergétiques, minéraux et and processing Implementation 30 10 13 12 vitamines), organoleptiques infrastructure des produits dérivés de l'anacarde fabriqués localement CI-FIRCA-212375-CS- INDV / Recrutement d'un consultant individuel devant 1. Institutional Individual réaliser la mission Under 2021-01- 2021-03- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 88450 strengthening and value Post Consultant Limited 13,000.00 0.00 d’accompagnement à Implementation 20 12 25 15 22 18 chain governance Selection l’élaboration et à la mise en place de matrices des prix des prestations de services du CITA. CI-PPCA-224177-CS-INDV / Recruter un Ingénieur des 1. Institutional Individual Pending 2021-06- 2021-08- 2021-08- 2021-10- 2022-04- statistiques pour appuyer le IBRD / 88450 strengthening and value Post Consultant Open 37,000.00 0.00 Implementation 21 09 30 04 02 CCA dans la collecte et le chain governance Selection traitement des données CI-PPCA-224279-CS-CDS 1. Institutional Pending 2021-05- 2021-05- 2021-07- 2022-01- / Recruter un Consultant IBRD / 88450 strengthening and value Post Direct Selection Direct 28,000.00 0.00 Implementation 14 24 28 24 informatique pour le PPCA chain governance CI-PPCA-224192-CS-INDV 1. Institutional Individual / Recruter un consultant Pending 2021-05- 2021-05- 2021-06- 2021-07- 2022-01- IBRD / 88450 strengthening and value Post Consultant Direct 19,000.00 0.00 pour former les agents de Implementation 10 20 10 15 11 chain governance Selection terrain du CCA CI-PPCA-224281-CS-INDV / Recruter un consultant 1. Institutional Individual pour réaliser une enquête Pending 2021-06- 2021-08- 2021-08- 2021-10- 2022-04- IBRD / 88450 strengthening and value Post Consultant Open 37,000.00 0.00 en vue d'évaluer la Implementation 21 09 30 04 02 chain governance Selection proportion de producteurs adhérant aux sociétés coopératives CI-PPCA-224292-CS-INDV / Recruter un consultant 1. Institutional Individual Pending 2021-06- 2021-06- 2021-07- 2021-08- 2022-02- pour organiser la formation IBRD / 88450 strengthening and value Post Consultant Limited 9,000.00 0.00 Implementation 15 20 11 15 11 du personnel aux soins de chain governance Selection premiers secours CI-PPCA-224293-CS-INDV 3. Support to private Individual / Recruter un consultant investment in post-harvest Under 2021-06- 2021-05- 2021-08- 2021-08- 2021-10- 2022-04- IBRD / 88450 Post Consultant Open 36,000.00 0.00 individuel pour la and processing Implementation 21 27 09 30 04 02 Selection conception de modèle HUB infrastructure CI-PPCA-224295-CS-INDV 1. Institutional Individual Pending 2021-05- 2021-05- 2021-06- 2021-07- 2022-01- / Recruter un consultant IBRD / 88450 strengthening and value Post Consultant Limited 11,000.00 0.00 Implementation 19 24 14 19 15 pour la réalisation du PGE- chain governance Selection Audit CI-PPCA-224306-CS-INDV / Recruter un consultant pour la réalisation de l'Etude de Dangers et 1. Institutional Individual Pending 2021-06- 2021-08- 2021-09- 2021-10- 2022-04- l'élaboration du Plan IBRD / 88450 strengthening and value Post Consultant Open 22,000.00 0.00 Implementation 30 18 08 13 11 d'Opération Interne chain governance Selection (disposition de prévention et gestion de la sécurité incendies et la santé et sécurité des personnes) CI-PPCA-224359-CS-INDV 1. Institutional Individual / Recruter des consultants Pending 2021-09- 2021-10- 2021-10- 2021-11- 2022-05- IBRD / 88450 strengthening and value Post Consultant Limited 28,000.00 0.00 pour la formation des OPEA Implementation 30 05 26 30 29 chain governance Selection en apiculture CI-PPCA-224449-CS-INDV / Recruter des consultants 3. Support to private Individual individuels pour réaliser les investment in post-harvest Pending 2021-06- 2021-08- 2021-08- 2021-09- 2022-03- IBRD / 88450 Post Consultant Open 56,000.00 0.00 études de PAR des petites and processing Implementation 15 03 24 28 27 Selection unités de décorticage de infrastructure noix de cajou CI-PPCA-224859-CS-INDV / Recruter des consultants 4. Program coordination, Individual pour renforcer les capacités Pending 2021-06- 2021-08- 2021-08- 2021-09- 2022-03- IBRD / 88450 monitoring and knowledge Prior Consultant Open 309,000.00 0.00 du CCA en vue du suivi de Implementation 17 05 26 30 29 management Selection la mise en œuvre des activités sur le terrain par les consultants CI-PPCA-224865-CS-INDV / Recruter un consultant en 4. Program coordination, Individual vue de réaliser une étude Pending 2021-06- 2021-08- 2021-08- 2021-10- 2022-04- IBRD / 88450 monitoring and knowledge Post Consultant Open 28,000.00 0.00 sur la prise en compte du Implementation 22 10 31 05 03 management Selection genre y compris l'évaluation des risques liés au VBG/EAS/HS CI-PPCA-224867-CS-INDV / Recruter un consultant pour former les agents de 4. Program coordination, Individual Pending 2021-05- 2021-05- 2021-06- 2021-07- 2022-01- santé des régions du projet IBRD / 88450 monitoring and knowledge Post Consultant Limited 11,000.00 0.00 Implementation 20 25 15 20 16 sur la prise en charge management Selection médicale des personnes intoxiquées aux pesticides CI-PPCA-224868-CS-INDV / Recruter deux (02) 4. Program coordination, Individual Pending 2021-05- 2021-07- 2021-07- 2021-09- 2022-03- consultants individuels pour IBRD / 88450 monitoring and knowledge Post Consultant Open 26,000.00 0.00 Implementation 20 08 29 02 01 faciliter l'organisation des management Selection évaluations participatives de 2020 CI-PPCA-224873-CS-INDV 4. Program coordination, Individual Pending 2021-04- 2021-05- 2021-05- 2021-06- 2021-12- / Recruter un consultant IBRD / 88450 monitoring and knowledge Post Consultant Limited 10,000.00 0.00 Implementation 27 02 23 27 24 pour team building management Selection CI-PPCA-225025-CS-INDV 2. Productivity / Recruter un consultant Individual enhancement and Pending 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- pour la revue à mi-parcours IBRD / 88450 Post Consultant Open 30,000.00 0.00 improved access to Implementation 10 29 19 23 22 des activités du Conseil Selection markets Agricole dédié CI-PPCA-225037-CS-INDV / Recruter un consultant en 2. Productivity Individual vue de la réalisation de enhancement and Pending 2021-05- 2021-07- 2021-08- 2021-09- 2022-03- IBRD / 88450 Post Consultant Open 47,000.00 0.00 l'étude du coût de improved access to Implementation 24 12 02 06 05 Selection production des noix brutes markets de cajou et des plants greffés CI-PPCA-225041-CS-INDV 2. Productivity / Recruter un consultant Individual enhancement and 2021-06- 2021-06- 2021-07- 2021-07- 2021-08- 2022-02- pour la formation des IBRD / 88450 Post Consultant Limited 12,000.00 0.00 Under Review improved access to 30 09 05 26 30 26 ménages à la confection des Selection markets mets à base de soja CI-PPCA-225107-CS-INDV 2. Productivity Individual / Recruter un Consultant enhancement and Pending 2021-06- 2021-06- 2021-07- 2021-08- 2022-02- IBRD / 88450 Post Consultant Limited 10,000.00 0.00 toxicologue pour la mise en improved access to Implementation 22 27 18 22 18 Selection œuvre du PGP markets CI-PPCA-225636-CS-CDS / Recruter par Sélection 2. Productivity Directe d'un consultant enhancement and Pending 2021-07- 2021-07- 2021-09- 2022-03- IBRD / 88450 Post Direct Selection Direct 36,000.00 0.00 pour réaliser les activités de improved access to Implementation 12 22 25 24 la Coordination Scientifique markets (CS) du PNRA CI-PPCA-225638-CS-CDS 2. Productivity / Convention avec l’ANADER enhancement and Pending 2021-06- 2021-07- 2021-09- 2022-03- en vue de la poursuite du IBRD / 88450 Prior Direct Selection Direct 1,993,000.00 0.00 improved access to Implementation 24 04 07 06 soutien au Conseil Agricole markets dédié à l'Anacarde CI-PPCA-225639-CS-CDS 2. Productivity / Convention avec l’ANADER enhancement and Pending 2021-06- 2021-07- 2021-09- 2022-03- en vue de la poursuite de la IBRD / 88450 Post Direct Selection Direct 280,000.00 0.00 improved access to Implementation 22 02 05 04 vulgarisation électronique markets dans la Filière Anacarde CI-PPCA-225642-CS-CDS 2. Productivity / Convention avec l’ANADER enhancement and Pending 2021-06- 2021-06- 2021-08- 2022-02- en vue du suivi et du IBRD / 88450 Post Direct Selection Direct 280,000.00 0.00 improved access to Implementation 15 25 29 25 contrôle des activités de markets réhabilitation des vergers CI-PPCA-225643-CS-CDS / Recruter un cabinet pour 2. Productivity la poursuite de l’appui à la enhancement and Pending 2021-05- 2021-05- 2021-08- 2022-01- IBRD / 88450 Post Direct Selection Direct 50,000.00 0.00 mise en œuvre du improved access to Implementation 20 30 03 30 programme des Opérateurs markets Professionnels du Cajou (OPCA) CI-PPCA-225645-CS-CDS / Recruter un consultant en 2. Productivity vue de poursuivre la enhancement and Pending 2021-06- 2021-07- 2021-09- 2022-03- IBRD / 88450 Post Direct Selection Direct 121,000.00 0.00 formation des applicateurs improved access to Implementation 24 04 07 06 des OPCA en vue d’en faire markets des applicateurs professionnels du cajou CI-PPCA-225646-CS-CDS 2. Productivity / Recruter un consultant enhancement and Pending 2021-06- 2021-06- 2021-08- 2022-02- IBRD / 88450 Post Direct Selection Direct 56,000.00 0.00 pour l’accompagnement des improved access to Implementation 16 26 30 26 parcelles tests de soja markets CI-FIRCA-234885-CS-CDS 4. Program coordination, / Recruter un consultant en Pending 2021-05- 2021-05- 2021-08- 2022-01- IBRD / 88450 monitoring and knowledge Post Direct Selection Direct 56,000.00 0.00 communication en appui à Implementation 20 30 03 30 management la mise en œuvre du projet Page 14 PROCUREMENT PLAN (Textual Part) Project information: Philippines, Metro Manila Flood Management Project P153814 Project Implementation agency: Department of Public Works and Metro Manila Development Authority Date of the Procurement Plan: 13 April 2018 Period covered by this Procurement Plan: April 16, 2018 to October 15, 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Government Procurement Reform Act (RA9184), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1. The procurement is open to all eligible firms from any country; 2. The request for bids/request for proposals document shall require the Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting signed contracts, confirming application of, and compliance with, the Bank's Anti- Corruption Guidelines, including without limitation the Bank's right to sanction and the Bank's inspection and audit rights; 3. Rights for the Bank to review procurement documentation and activities; and 4. An effective complaints mechanism. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Work) Goods: 15%; Works: is not applicable. PROCUREMENT Philippines : Metro Manila Flood Management Project PLAN General Information Country: Philippines Bank’s Approval Date of the Original Procurement Plan: 2018-04-19 2021-05-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153814 GPN Date: 2018-03-15 Project Name: Metro Manila Flood Management Project Loan / Credit No: IBRD / 87840, COFN / C1450 M Executing Agency(ies): etro Manila Development Authority WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PH-MMDA-CO203-4 / Design and Construction of Warehouse for Solid Waste Management Tools and Under Equipment with Office and 2. Minimizing Solid Waste in Single Stage - One 2022-02- IBRD / 87840 Post Request for Bids Open - National 480,292.40 0.00 Implementat 2021-04-16 2021-04-19 2021-04-21 2021-06-02 2021-07-02 2021-08-06 Quarters at Labasan PS. This Waterways Envelope 02 ion will be a solid structure where we will store tools and equipment for the implementation of the project. PH-MMDA-230683-CW-RFB National / Fabrication of Conveyor, Procurement Under Modification of Existing 2. Minimizing Solid Waste in 2021-08- IBRD / 87840 Post Direct Selection Direct Document - 1 50,000.00 0.00 Implementat 2021-04-30 2021-05-11 2021-05-05 2021-06-09 Conveyor and Civil Works on Waterways 08 Envelope process ion Staging Area and Perimeter (Non Bank-SPD) Fence. PH-MMDA-238497-CW-RFB National / Design and Construction of Procurement Pending 2. Minimizing Solid Waste in Single Stage - One 2022-04- Trash Traps on Selected Sites IBRD / 87840 Post Request for Bids Open - National Document - 1 702,300.00 0.00 Implementat 2021-06-18 2021-06-23 2021-08-04 2021-09-03 2021-10-08 Waterways Envelope 06 of Estero de Paco and San Envelope process ion Juan River and its Tributary (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PH-MMDA-58579-GO-RFB / Trucks/Loader/Vehicle Package to include garbage compactor truck, rear end 2. Minimizing Solid Waste in Single Stage - One loading garbage compactor, IBRD / 87840 Prior Request for Bids Open - International 2,177,788.00 0.00 Canceled 2018-04-23 2018-04-28 2018-06-09 2018-07-09 2018-08-13 2019-02-09 Waterways Envelope garbage bins, hook lift loader truck, fork lift, hook lift container, dump truck, wheel pay loader, service vehicle PH-MMDA-59025-GO-RFQ / Solid Waste Management Tools that will be used for the implementation of community- based management program 2. Minimizing Solid Waste in Request for Single Stage - One (buggy, push carts, trolley IBRD / 87840 Post Open - National 96,154.00 0.00 Canceled 2018-10-06 2018-12-01 2019-05-30 Waterways Quotations Envelope bins, shovel, rakes, broomsticks, dust pans, plastic bags, gloves, face masks, rubber coats, raincoats) PH-MMDA-63617-GO-RFQ / Multi-purpose Vehicle (MPV) that will be used for project 4. Project Management and Request for Single Stage - One IBRD / 87840 Post Open - National 57,692.31 0.00 Canceled 2018-05-30 2018-07-25 2019-01-21 monitoring, site inspections, Coordination Quotations Envelope filed visits and coordination meetings PH-MMDA-63620-GO-RFB / Truck/Loader package to include garbage compactor truck, rear end loading 2. Minimizing Solid Waste in Single Stage - One garbage compactor, garbage IBRD / 87840 Prior Request for Bids Open - International 2,120,096.15 2,095,970.98 Signed 2018-05-25 2018-07-13 2018-05-30 2018-07-16 2018-07-11 2018-08-10 2019-03-28 2018-09-14 2019-04-29 2019-03-13 Waterways Envelope bins, hook lift loader truck, fork lift, hook lift container, dump truck and wheel pay loader PH-MMDA-144289-GO-RFB / Sound Trucks will be utilized as a modern and interactive approach in the community- based education & 2. Minimizing Solid Waste in Single Stage - One communications campaign of COFN / C1450 Post Request for Bids Open - National 214,384.00 223,435.91 Signed 2019-11-15 2019-11-20 2019-11-20 2020-01-01 2019-12-11 2020-01-31 2020-03-30 2020-03-06 2020-11-06 2020-09-02 Waterways Envelope proper Solid Waste Management at the barangay level as laid out in the MMFMP- Component 2. Two sound trucks will be purchased. PH-MMDA-144305-GO-RFB / Mobile Material Recovery Facilities (MRFs) are trucks operated by the MMDA-SWMO that will roam around 2. Minimizing Solid Waste in Single Stage - One different barangays involved COFN / C1450 Post Request for Bids Open - National 178,602.21 177,071.22 Signed 2019-11-15 2019-11-20 2019-11-20 2020-01-01 2019-12-11 2020-01-31 2019-12-26 2020-03-06 2019-12-27 2020-09-02 Waterways Envelope in MMFMP-Component 2 and collect recyclable materials in exchange of basic necessities. Three trucks will be purchased. Page 1 PH-MMDA-145500 / The Geographic Information Systems (GIS) is a computer platform for mapping/visual representation and will be 4. Project Management and COFN / C1450 Post Direct Selection Direct 32,030.65 0.00 Canceled 2019-09-26 2019-09-23 2019-10-01 2019-11-05 2020-05-03 used for gathering and Coordination analyzing existing/supplementary data in the pumping stations and nearby areas. PH-MMDA-145501 / The Solid Waste Granulator is a unique technology that prolongs the service life of landfills through reduction of 2. Minimizing Solid Waste in COFN / C1450 Prior Direct Selection Direct 492,332.25 517,212.75 Signed 2019-10-22 2020-02-15 2019-10-27 2020-08-21 2019-12-01 2019-12-27 2020-05-29 solid waste volume dumped Waterways along waterways/drainage areas. Bio-wastes and plastics will be refined and converted into by-products. PH-MMDA-63617 / The Multi- Purpose Vehicle (MPV) will be used for project monitoring, 4. Project Management and Request for Single Stage - One site inspections, filed visits, COFN / C1450 Post Open - National 49,414.50 49,096.63 Signed 2019-05-30 2019-07-25 2019-06-17 2020-01-21 Coordination Quotations Envelope and coordination meetings. Two (2) units will be purchased. PH-MMDA-63622 / Miscellaneous SWM Tools & Equipment (in units) as part of MMFMP Phase 1 - Component 2. Minimizing Solid Waste in Request for Single Stage - One 2: Pushcarts (75), Bicycle Bell COFN / C1450 Post Open - National 98,882.90 102,709.50 Terminated 2019-03-19 2019-05-14 2019-12-30 2019-11-10 Waterways Quotations Envelope Rings (75), Boats (30), Buggies/Wheelbarrows (30), Tribikes (80), and Rolling Bins (160). PH-MMDA-2019202 / Water bottles and canvas bags to support the Information, Education & Communications (IEC) campaigns to raise 2. Minimizing Solid Waste in Request for Single Stage - One COFN / C1450 Post Limited 10,590.00 0.00 Canceled 2019-10-15 2019-12-10 2020-06-07 awareness and encourage Waterways Quotations Envelope behavior change for improved solid waste management at the individual and household levels. PH-MMDA-2019203 / LED Wall Rental for the 2019 Solid Waste Management (SWM) Summit to kickoff and support Under 2. Minimizing Solid Waste in Request for Single Stage - One the IEC campaigns, engage COFN / C1450 Post Limited 4,410.00 0.00 Implementati 2019-11-03 2019-11-15 2019-12-29 2020-06-26 Waterways Quotations Envelope barangay officials, and on introduce the concept of circular resource management through interactive activities. PH-MMDA-2019204 / Shirts for the 2019 Solid Waste Management (SWM) Summit to kickoff and support the IEC 2. Minimizing Solid Waste in Request for Single Stage - One campaigns, engage barangay COFN / C1450 Post Limited 2,940.00 1,496.50 Signed 2019-11-03 2019-10-14 2019-12-29 2019-12-03 2020-06-26 Waterways Quotations Envelope officials, and introduce the concept of circular resource management through interactive activities. PH-MMDA-144308-GO-RFB / CCTV cameras/infra will be installed at strategic locations in MM barangays to monitor waste disposal activities Under 2. Minimizing Solid Waste in Single Stage - One along/beside creeks and COFN / C1450 Prior Request for Bids Open - National 536,640.00 0.00 Implementati 2019-11-15 2020-11-15 2019-11-20 2020-01-01 2021-01-04 2020-01-31 2021-06-06 2020-03-06 2020-09-02 Waterways Envelope esteros (estuaries). CCTV on control & monitoring systems/rooms will also be provided in the respective Barangay Halls. PH-MMDA-CO201-1 / Pilot Barangay-Based SWM Technologies - Procurement of proposed Solid Waste Pending 2. Minimizing Solid Waste in Request for Single Stage - One Collection Technologies and COFN / C1450 Post Open - National 24,306.81 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Waterways Quotations Envelope installation in the pilot on barangays for the implementation of Component 2 PH-MMDA-CO201-7 / Purchase of ICT equipment for priority barangays as part of community quarantine 2. Minimizing Solid Waste in Request for Single Stage - One IBRD / 87840 Post Open - National 11,472.53 15,187.90 Signed 2020-11-08 2021-01-03 2020-12-29 2021-07-02 implementation during the Waterways Quotations Envelope COVID-19 pandemic. This is under the implementation of Component 2. PH-MMDA-CO202-4 / Pending 2. Minimizing Solid Waste in Request for Single Stage - One Signages for Heavy Equipment IBRD / 87840 Post Open - National 1,346.15 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Waterways Quotations Envelope and Vehicles on PH-MMDA-CO202-5 / Washable Overall PPEs for Garbage Collectors, Landfill Staff, and FCSMO Staff - Procurement of personal Pending 2. Minimizing Solid Waste in Request for Single Stage - One protective equipment for the IBRD / 87840 Post Open - National 19,903.85 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Waterways Quotations Envelope waste management and on pumping stations personnel as part of COVID-10 pandemic response under the Component 2 Page 2 Under PH-MMDA-CO204-3 / MPV - 2. Minimizing Solid Waste in Request for Single Stage - One COFN / C1450 Post Open - National 65,384.62 81,197.19 Implementati 2020-11-08 2021-01-03 2021-07-02 21 seater (MPV 5, 6) Waterways Quotations Envelope on PH-MMDA-CO204-2 / MPV - 7 seater (MPV 3, 4) - Procurement of vehicles to be 2. Minimizing Solid Waste in Request for Single Stage - One IBRD / 87840 Post Open - National 73,076.92 76,070.07 Signed 2020-11-08 2021-01-03 2020-10-01 2021-07-02 utilized by project team for Waterways Quotations Envelope the implementation of Component 2 PH-MMDA-CO204-5 / Conduct of Operation and Maintenance for Solid Waste Pending Granulator - Procurement of 2. Minimizing Solid Waste in Request for Single Stage - One IBRD / 87840 Post Open - National 19,230.76 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 additional parts and Waterways Quotations Envelope on accessories for a more effective utilization of Solid Waste Granulator PH-MMDA-CO205-2 / GNSS RTK System with CORS - Procurement of scanning 2. Minimizing Solid Waste in Request for Single Stage - One system for immediate data IBRD / 87840 Post Open - National 66,250.00 70,805.21 Signed 2020-11-08 2021-01-03 2020-12-29 2021-07-02 Waterways Quotations Envelope collection within the catchment areas of pumping stations PH-MMDA-CO207 / Staff Uniform and PPEs - Procurement of personal Pending 2. Minimizing Solid Waste in Request for Single Stage - One protective equipment for the COFN / C1450 Post Open - National 23,480.77 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Waterways Quotations Envelope project team as part of COVID- on 10 pandemic response under the Component 2 PH-MMDA-CO42-3 / Project Management Office Pending Operations, Manpower, 4. Project Management and Request for Single Stage - One COFN / C1450 Post Open - National 8,076.92 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Supplies, Equipment, Coordination Quotations Envelope on Furniture and Meeting (Operations - Additional Office Furniture) PH-MMDA-CO42-4 / Project Management Office Pending Operations, Manpower, 4. Project Management and Request for Single Stage - One IBRD / 87840 Post Open - National 4,807.69 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Supplies, Equipment, Coordination Quotations Envelope on Furniture and Meeting (Operations - Office Applicances) PH-MMDA-CO204-4 / Payloader - Procurement of vehicles to be utilized by project team for the collection 2. Minimizing Solid Waste in Request for Single Stage - One COFN / C1450 Post Open - National 94,230.77 0.00 Canceled 2020-11-08 2021-01-03 2021-07-02 of waste in the pumping Waterways Quotations Envelope stations as part of the implementation of Component 2 PH-MMDA-200986-GO-RFB- 2 / Miscellaneous SWM Tools and Equipment - - as part of MMFMP Phase 1 - Component 2. Minimizing Solid Waste in Single Stage - One 2: Pushcarts (75), Bicycle IBRD / 87840 Post Request for Bids Open - National 98,882.90 0.00 Canceled 2019-03-14 2019-03-19 2019-04-30 2019-05-30 2019-07-04 2019-12-31 Waterways Envelope Bell Rings (75), Boats (30), Buggies/Wheelbarrows (30), Tribikes (80), and Rolling Bins (160) Under PH-MMDA-CO205-3 / 2. Minimizing Solid Waste in Single Stage - One COFN / C1450 Post Request for Bids Open - National 137,500.00 0.00 Implementati 2020-11-03 2020-07-22 2020-11-08 2020-12-20 2020-08-17 2021-01-19 2021-02-23 2021-08-22 Scanning Station Waterways Envelope on PH-MMDA-CO205-4 / Other Pending 2. Minimizing Solid Waste in Single Stage - One Survey Equipment, Software IBRD / 87840 Post Request for Bids Open - National 208,653.85 0.00 Implementati 2020-11-03 2020-11-08 2020-12-20 2021-01-19 2021-02-23 2021-08-22 Waterways Envelope and Accessories on Pending PH-MMDA-CO204-6 / 2. Minimizing Solid Waste in Single Stage - One COFN / C1450 Post Request for Bids Open - National 182,692.31 0.00 Implementati 2020-11-03 2020-11-08 2020-12-20 2021-01-19 2021-02-23 2021-08-22 Payloader Waterways Envelope on PH-MMDA-CO42-7 / Project Management Office Under Operations, Manpower, 4. Project Management and Single Stage - One IBRD / 87840 Post Request for Bids Open - National 154,086.19 0.00 Implementati 2020-11-03 2021-04-21 2020-11-08 2020-12-20 2021-01-19 2021-02-23 2021-08-22 Supplies, Equipment, Coordination Envelope on Furniture and Meeting (ICT Year 3 EQUIPMENT) PH-MMDA-CO42-8 / Project Management Office Operations, Manpower, Supplies, Equipment, Pending Furniture and Meeting (ICT 4. Project Management and Request for Single Stage - One IBRD / 87840 Post Limited 31,200.40 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Year 3- SOFTWARE) - Coordination Quotations Envelope on Microsoft Office and AutoCAD for ICT YR 3 Equipment that will be distributed to MMDA offices that takes part in the project PH-MMDA-2019201 / Posters and flyers to suppor the Information, Education & Communications (IEC) campaigns to raise awareness 2. Minimizing Solid Waste in Request for Single Stage - One COFN / C1450 Post Limited 9,095.00 0.00 Canceled 2019-10-15 2019-11-15 2019-12-10 2020-06-07 and encourage behavior Waterways Quotations Envelope change for improved solid waste management at the individual and household levels. Page 3 PH-MMDA-200986-GO-RFQ- 3 / Miscellaneous SWM Tools and Equipment - - as part of MMFMP Phase 1 - Component 2. Minimizing Solid Waste in Request for Single Stage - One 2: Pushcarts (75), Bicycle Bell IBRD / 87840 Post Open - National 96,153.84 100,848.94 Signed 2020-03-19 2020-05-14 2019-12-30 2020-11-10 Waterways Quotations Envelope Rings (75), Boats (30), Buggies/Wheelbarrows (30), Tribikes (80), and Rolling Bins (160) PH-MMDA-230214-GO-RFB / The Supply, Fabrication, and Delivery of SWM Equipment Pending 2. Minimizing Solid Waste in Single Stage - One and Tools will strengthen the IBRD / 87840 Post Request for Bids Open - National 650,464.00 0.00 Implementati 2021-04-30 2021-05-14 2021-06-25 2021-07-25 2021-08-29 2022-03-27 Waterways Envelope capacity of both MMDA and on the barangays on regular operations. PH-MMDA-234925-GO-RFQ Pending / 45 Composite Tumbler with 2. Minimizing Solid Waste in Request for Single Stage - One IBRD / 87840 Post Open - National 24,930.00 0.00 Implementati 2021-06-04 2021-07-30 2021-10-28 Manual Sieve with Tools & Waterways Quotations Envelope on Equipment. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PH-MMDA-CO201-2 / Barangay-based Waste Collection from Waterways- Pending Enforcement of Solid Waste 2. Minimizing Solid Waste in Request for Single Stage - One IBRD / 87840 Post Open - National 14,198.60 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Management system in Waterways Quotations Envelope on barangays for the implementation of Component 2 PH-MMDA-CO201-8 / Capacity Building for Barangays- Knowledge enhancement initiative for Pending 2. Minimizing Solid Waste in Request for Single Stage - One barangays in the adoption of COFN / C1450 Post Open - National 19,592.31 0.00 Implementati 2020-11-08 2021-01-03 2021-07-02 Waterways Quotations Envelope improved solid waste on management system under Component 2 programs and projects PH-MMDA-200985-NC-RFQ / Audio Visual Presentation 2. Minimizing Solid Waste in Request for Single Stage - One IBRD / 87840 Post Open - National 57,692.30 52,026.13 Signed 2019-10-15 2019-12-10 2019-12-27 2020-06-07 for IEC-BCC campaigns of the Waterways Quotations Envelope MMFMP Component 2 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PH-MMDA-59028-CS-QCBS / Services of Consultancy Firm that will develop the 2. Minimizing Solid Waste in Quality And Cost- Under IBRD / 87840 Prior Open - International 769,231.00 0.00 2018-04-23 2018-10-12 2018-05-14 2019-01-21 2018-06-27 2020-01-29 2018-07-25 2020-03-09 2018-08-24 2020-10-14 2018-09-28 2020-11-23 2018-11-02 2019-11-02 Community-based Waterways Based Selection Implementation Management System under Component 2 PH-MMDA-59026-CS-QCBS / Procurement of consulting 2. Minimizing Solid Waste in Quality And Cost- firm services that will develop IBRD / 87840 Prior Open - International 1,153,846.00 1,120,732.95 Signed 2018-04-23 2018-06-22 2018-05-14 2018-08-09 2018-06-27 2019-06-05 2018-07-25 2019-08-15 2018-08-24 2020-02-18 2018-09-28 2020-10-05 2018-11-02 2020-12-01 2019-11-02 Waterways Based Selection the Metro Manila Solid Waste Master Plan PH-MMDA-CO202-2 / Procurement of Consultancy 2. Minimizing Solid Waste in Quality And Cost- IBRD / 87840 Prior Open - International 2,842,204.42 0.00 Under Review 2020-11-03 2021-05-12 2020-11-24 2021-01-07 2021-02-04 2021-03-06 2021-04-10 2021-05-15 2022-05-15 Services for the CBSWMP Year Waterways Based Selection 2 PH-MMDA-CO202-1 / Waste Analysis and Characterization Study for the LGUs of Metro Manila- Study to be 2. Minimizing Solid Waste in Quality And Cost- Pending IBRD / 87840 Post Open - International 311,538.46 0.00 2020-11-03 2020-11-24 2021-01-07 2021-02-04 2021-03-06 2021-04-10 2021-05-15 2022-05-15 conducted for the purposes of Waterways Based Selection Implementation data refinement and validation under the implementation of Component 2. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PH-MMDA-59027-CS-INDV / Project Management Specialist Individual (PMS) who shall oversee and 4. Project Management and IBRD / 87840 Post Consultant Open 85,000.00 87,785.49 Signed 2018-04-16 2018-05-21 2018-06-04 2018-09-03 2018-06-25 2018-10-08 2018-07-30 2018-10-15 2019-01-26 manage the over-all technical, Coordination Selection administrative and document control of the project PH-MMDA-64559-CS-INDV / Additional Project Management Specialist (PMS) who shall oversee and Individual manage technical, 4. Project Management and IBRD / 87840 Post Consultant Open 85,000.00 15,563.58 Signed 2018-06-04 2019-08-01 2018-07-23 2019-06-10 2018-08-13 2019-07-01 2018-09-17 2019-08-01 2019-03-16 administrative and document Coordination Selection control of the project and shall head a group of specialists with the actual community-based SWM activities. Page 4 PH-MMDA-122170-CS-INDV- 1 / The Project Manager shall oversee and manage the Individual 4. Project Management and overall day-to-day technical, COFN / C1450 Post Consultant Open 101,923.00 23,943.97 Signed 2019-05-28 2019-05-28 2019-07-16 2019-12-11 2019-08-06 2020-01-23 2019-09-10 2020-03-13 2020-03-08 Coordination administrative, and document Selection control in MMDA’s Project Management Office (PMO). PH-MMDA-110488-CS-INDV- 1 / The Project Officer shall serve as the substitute of the Project Manager to oversee Individual and manage the overall 4. Project Management and COFN / C1450 Post Consultant Open 86,634.62 20,365.38 Signed 2019-07-30 2019-07-30 2019-09-17 2019-09-09 2019-10-08 2019-09-13 2019-11-12 2019-12-23 2020-05-10 technical, administrative, and Coordination Selection document control of the project in consultation with the MMDA Project Management Office (PMO). PH-MMDA-110487-CS-INDV- 1 / The Procurement Specialist shall manage the Individual 4. Project Management and overall procurement activity of COFN / C1450 Post Consultant Open 86,634.62 20,365.38 Completed 2019-04-29 2019-04-29 2019-06-17 2019-09-18 2019-07-08 2019-09-23 2019-08-12 2019-11-25 2020-02-08 2020-10-14 Coordination the project in consultation Selection with the MMDA Project Management Office (PMO). PH-MMDA-119346-CS-INDV- 1 / The Finance Management Specialist shall oversee and manage the overall financial Individual management aspect including 4. Project Management and COFN / C1450 Post Consultant Open 86,634.62 20,365.38 Signed 2019-04-29 2019-04-29 2019-06-17 2019-10-23 2019-07-08 2019-10-28 2019-08-12 2019-11-13 2020-02-08 technical, administrative, and Coordination Selection document controls of the project in consultation with the MMDA Project Management Office (PMO). PH-MMDA-148143-CS-INDV / Additional Community Development Specialist (CDS) who shall be responsible for coordinating and monitoring Individual 2. Minimizing Solid Waste in the community development COFN / C1450 Post Consultant Open 65,000.00 16,114.71 Signed 2019-12-02 2019-12-02 2020-01-20 2020-09-21 2020-02-10 2020-09-30 2020-03-16 2020-10-07 2020-09-12 Waterways aspects of Component 2 of Selection MMFMP. The CDS shall support the Project Management Office and Solid Waste Management Office. PH-MMDA-122171-CS-INDV- 1 / The Community Development Specialist (CDS) Individual shall be responsible for 4. Project Management and COFN / C1450 Post Consultant Open 66,250.00 0.00 Canceled 2019-06-20 2019-06-20 2019-08-08 2019-08-29 2019-10-03 2020-03-31 coordinating and monitoring Coordination Selection the community development aspects of the Component 2 of MMFMP. PH-MMDA-205051-CS-INDV / The Procurement Specialist shall manage the overall Individual 4. Project Management and Under procurement activity of the COFN / C1450 Post Consultant Open 60,480.76 0.00 2020-11-17 2020-11-17 2021-01-05 2021-01-26 2021-03-02 2021-08-29 Coordination Implementation project in consultation with Selection the MMDA Project Management Office (PMO) PH-MMDA-CO41-2 / Project Management Office Individual 4. Project Management and Pending Operations - (Manpower - IBRD / 87840 Post Consultant Open 125,673.08 0.00 2020-01-01 2020-02-19 2020-03-11 2020-04-15 2020-10-12 Coordination Implementation PMO Consultants Selection Renumeration) PH-MMDA-122171-INDV-2 / The Community Development Specialist (CDS) shall be Individual responsible for coordinating 4. Project Management and Under COFN / C1450 Post Consultant Open 66,250.00 0.00 2019-11-30 2020-11-30 2020-01-18 2020-11-18 2020-02-08 2020-11-23 2020-03-14 2020-09-10 and monitoring the Coordination Implementation Selection community development aspects of the Component 2 of MMFMP. PH-MMDA-216929-CS-INDV Individual / Individual Consultancy 4. Project Management and Under IBRD / 87840 Post Consultant Open 61,837.50 0.00 2021-01-04 2021-01-04 2021-02-22 2021-03-01 2021-03-15 2021-03-12 2021-04-19 2021-10-16 Services/Monitoring & Coordination Implementation Selection Evaluation (M&E) Specialist PH-MMDA / Individual Individual Consultancy Services/PMO 4. Project Management and IBRD / 87840 Post Consultant Open 3,557.69 0.00 Canceled 2021-01-04 2021-01-04 2021-02-22 2021-03-15 2021-04-19 2021-10-16 Internal Midterm Assessment Coordination Selection Consultant PH-MMDA-220061-CS-INDV / Individual Consultancy Individual 4. Project Management and Under Services/PMO Internal IBRD / 87840 Post Consultant Direct 3,557.69 0.00 2021-01-04 2021-01-04 2021-01-14 2021-02-19 2021-02-04 2021-02-19 2021-03-11 2021-09-07 Coordination Implementation Midterm Assessment Selection Consultant PH-MMDA-229420-CS-INDV / The overall function covers maintaining and facilitating Individual 4. Project Management and Under positive relationships between IBRD / 87840 Post Consultant Open 1,300.00 0.00 2021-04-16 2021-04-19 2021-06-04 2021-06-25 2021-07-30 2022-07-30 Coordination Implementation the public and other Selection organizations often using media outlets. Page 5 Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Original: February 24, 2017 2. Date of General Procurement Notice: To Be Published 3. Period covered by this procurement plan: August 2017 to February 2019 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Threshold (>=US million) Works (including turnkey, supply and 5 installation of plant and equipment, and Public Private Partnership (PPP) Goods, information technology and 1.5 non-consulting services 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual Issued by the Ministry of Water, Irrigation and Electricity, August 2017. 5. Any Other Special Procurement Arrangements: Not Applicable. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 July 9, 2010 Ref. Descripti Estimated Packag Domestic Review Com No. on Cost es Preference by Bank men US$ (yes/no) (Prior / ts million Post) 1 Summary 32 2 To be Prior of the ICB Determine (Works) d 2 Summary 10.2 6 To be Prior of the ICB Determine (Goods) d 3 Summary 19.4 5 No Post of the NCB (Works) 4 Summary 0.28 1 No Post of the NCB (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: 2. Type of Procurement Prior Review Threshold (>=US million) Consultants: firms 0.5 Consultants: Individuals 0.2 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. Description of Estimat Package Review Comment No. Assignment ed s by Bank s Cost (Prior / US$ Post) million 1 Summary of 3.5 3 Prior number of July 9, 2010 contracts that will be let under QCBS 2 Summary of 11.8 14 Post number of contracts that will be let under QCBS 3 Summary of 10.1 31 Post CQS/IC number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Ethiopia : Second Ethiopia Urban Water Supply and Sanitation Project PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2018-01-15 Revised Plan Date(s): (comma delineated, leave blank if none)2021-05-31 Project ID: P156433 GPN Date: 2018-02-02 Project Name: Second Ethiopia Urban Water Supply and Sanitation Project Loan / Credit No: IDA / 60070, IDA / 60080 Executing Agency(ies):Ministry of Water Irrigation and Electricity, WSS Program Management Unit WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ET-MOWIE-77733-CW-DIR / Component 2: Sanitation and Pending Pipe laying for Dire Dewa town water supply services 2018-11- 2018-12- 2019-01- 2019-05- IDA / 60070 Post Direct Selection Direct 458,379.00 0.00 Implementat water supply project by Dire improvement in secondary 28 03 07 07 ion Dewa town cities ET-MOWIE-143512-CW-RFB Component 2: Sanitation and / Construction of public and Pending water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- communal toilet for Asosa IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 20 25 25 24 28 26 town by Asosa Water Supply ion cities and Sewerage Authority ET-MOWIE-143682-CW-RFB Component 2: Sanitation and / Construction of public and Pending water supply services Single Stage - One 2019-11- 2019-12- 2020-01- 2020-01- 2020-03- 2021-05- communal latrines for IDA / 60070 Post Request for Bids Open - National 1,626,000.00 0.00 Implementat improvement in secondary Envelope 27 02 01 31 06 30 Bahirdar town by Bahirdar ion cities town Water Supply Project ET-MOWIE-143697-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal latrines for water supply services Single Stage - One 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2021-05- IDA / 60070 Post Request for Bids Open - National 1,002,000.00 0.00 Implementat Adama Town By Adama improvement in secondary Envelope 28 03 02 01 07 31 ion Town Waste Water cities Management Project ET-MOWIE-143699-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal latrines for water supply services Single Stage - One 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2021-05- IDA / 60070 Post Request for Bids Open - National 1,192,000.00 0.00 Implementat Diredewa Town by Diredewa improvement in secondary Envelope 28 03 02 01 07 31 ion Town Water Supply and cities Sewerage Enterprise ET-MOWIE-143704-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal latrines for water supply services Single Stage - One 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2021-05- IDA / 60070 Post Request for Bids Open - National 1,436,000.00 0.00 Implementat Hawasa Town by Hawasa improvement in secondary Envelope 28 03 02 01 07 31 ion Town Water supply and cities sewerage service ET-MOWIE-143535-CW-RFB Component 2: Sanitation and / Construction of public and Pending water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- communal toilet for Dessie IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 20 25 25 24 28 26 town by Water Supply and ion cities Sewerage Authority ET-MOWIE-143530-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal toilet for Deghabur water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat town by Deghabur Water improvement in secondary Envelope 20 25 25 24 28 26 ion Supply and Sewerage cities Enterprise ET-MOWIE-143532-CW-RFB Component 2: Sanitation and / Construction of public and Pending water supply services Single Stage - One 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- communal toilet for Sodo IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 28 03 02 01 07 03 town by Sodo Water Supply ion cities and Sewerage Authority ET-MOWIE-142793-CW-RFB / Construction of FSM (fecal Component 2: Sanitation and sludge management) for water supply services Open - Single Stage - One 2019-12- 2019-12- 2020-02- 2020-03- 2020-04- 2021-11- IDA / 60070 Post Request for Bids 8,610,620.78 0.00 Canceled Bahirdar and Hawasa Towns improvement in secondary International Envelope 25 30 10 11 15 06 by water development cities commission ET-MOWIE-143521-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal toilet for Semera water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat towns by Semera Water improvement in secondary Envelope 20 25 25 24 28 26 ion Supply and Sewerage cities Authority ET-MOWIE-143537-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal toilet for water supply services Single Stage - One 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat Debrebirhan town by improvement in secondary Envelope 28 03 02 01 07 03 ion Debrebirhan Water Supply and cities Sewerage Authority ET-MOWIE-143510-CW-RFB Component 2: Sanitation and / Construction of public and Pending water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- communal toilet for Asella IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 20 25 25 24 28 26 Town by Asella Water Supply ion cities and Sewerage Enterprise ET-MOWIE-143522-CW-RFB Component 2: Sanitation and / Construction of public and water supply services Single Stage - One 2019-11- 2020-02- 2019-11- 2019-12- 2020-04- 2020-01- 2020-05- 2020-02- 2020-06- 2020-08- communal toilet for Adigrat IDA / 60070 Post Request for Bids Open - National 2,000,000.00 490,071.10 Signed improvement in secondary Envelope 20 13 25 25 28 24 12 28 30 26 towns by Adigrat Water cities Supply and Sewerage service ET-MOWIE-143528-CW-RFB Component 2: Sanitation and / Construction of public and Pending water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- communal toilet for Jigjiga IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 20 25 25 24 28 26 town by Jigjiga Water Supply ion cities and Sewerage Enterprise ET-MOWIE-143501-CW-RFB Component 2: Sanitation and / construction of public and Pending water supply services Single Stage - One 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- communal toilet for Bishoftu IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 28 03 14 13 19 15 town by Bishoftu Water ion cities Supply and Sewerage Authority ET-MOWIE-143272-CW-RFB / construction of public and Component 2: Sanitation and Pending communal toilet for Nekemte water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat Town By Nekemte Water improvement in secondary Envelope 20 25 25 24 28 26 ion supply and Sewerage cities Enterprise . ET-MOWIE-143519-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal toilet for Gambella water supply services Single Stage - One 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat towns by Gambella Water improvement in secondary Envelope 28 03 02 01 07 03 ion Supply and Sewerage cities Authority ET-MOWIE-143478-CW-RFB Component 2: Sanitation and / Construction of public and Pending water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- communal toilet for Jima town IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 20 25 25 24 28 26 by Jima Water Supply and ion cities Sewerage Authority ET-MOWIE-143524-CW-RFB Component 2: Sanitation and / Construction of public and Under water supply services Single Stage - One 2019-11- 2020-05- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- communal toilet for Harar IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 20 20 25 25 24 28 26 town by Harar Water Supply ion cities and Sewerage Authority ET-MOWIE-143531-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal toilet for water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat Arbaminch town by improvement in secondary Envelope 20 25 25 24 28 26 ion Arbaminch Water Supply and cities Sewerage Authority ET-MOWIE-143536-CW-RFB Component 2: Sanitation and / Construction of public and Pending water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- communal toilet for Gonder IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat improvement in secondary Envelope 20 25 25 24 28 26 town by Gonder Water Supply ion cities and Sewerage Authority Page 1 ET-MOWIE-143503-CW-RFB / Construction of public and Component 2: Sanitation and Pending communal toilet for water supply services Single Stage - One 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IDA / 60070 Post Request for Bids Open - National 2,000,000.00 0.00 Implementat Shashamene town by improvement in secondary Envelope 20 25 25 24 28 26 ion Shashamene Water Supply cities and Sewerage Enterprise ET-MOWIE-139087-CW-RFB / Design, Construction and Operation of Five Cities Faecal Component 2: Sanitation and Sludge Treatment Plant (FSTP) Pending water supply services Open - Single Stage - One 21,643,000.0 2020-03- 2020-04- 2020-06- 2020-07- 2020-08- 2020-10- under two lots ( Lot I Adama, IDA / 60070 Prior Request for Bids 0.00 Implementat improvement in secondary International Envelope 0 13 17 01 02 24 17 Dire Dewa and Mekelle and ion cities Lot II Bahir Dar and Hawasa). Implementing Agency: Water Development Commission. ET-MOWIE-172250-CW-RFQ / construction of civil work, Component 2: Sanitation and supply and installation of Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-10- pipes and fittings for IDA / 60070 Post Limited 73,970.00 0.00 Implementat improvement in secondary Quotations Envelope 25 20 18 Shashamene town WSSE low ion cities income are by Shashamene town WSSE ET-MOWIE-172255-CW-RFQ / Civil work and supply and Component 2: Sanitation and Pending installation of water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-10- IDA / 60070 Post Limited 90,640.00 0.00 Implementat electromagnetical equipment improvement in secondary Quotations Envelope 25 20 18 ion for Nekemte town low income cities are by Nekemte town WSSE ET-MOWIE-172258-CW-RFQ Component 2: Sanitation and / Expansion of Water Supply Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-10- system for Adigrat town low IDA / 60070 Post Limited 75,260.00 0.00 Implementat improvement in secondary Quotations Envelope 25 20 18 income area by Adigrat town ion cities WSSE ET-MOWIE-172259-CW-RFQ Component 2: Sanitation and / Earth Work, supply and water supply services Request for Single Stage - One 2020-05- 2020-04- 2020-07- 2020-04- 2020-10- installation of pipes and fitting IDA / 60080 Post Limited 75,800.00 29,363.01 Completed improvement in secondary Quotations Envelope 25 18 20 30 18 for Jigjiga town low income cities are by Jigijiga town WSSE ET-MOWIE-172260-CW-RFQ / Earth work and supply and Component 2: Sanitation and installation of pipes and fitting water supply services Request for Single Stage - One 2020-05- 2020-04- 2020-07- 2020-04- 2020-09- for Degahabur town low IDA / 60070 Post Limited 75,800.00 16,028.61 Signed improvement in secondary Quotations Envelope 25 09 20 27 18 income area water supply cities project by Deghabur town WSSE ET-MOWIE-172944-CW-RFP / Design, Construction and Operation of Five Cities Faecal Component 2: Sanitation and Sludge Treatment Plant (FSTP) water supply services Request for Open - Single Stage - Two 21,643,000.0 Under 2020-06- 2020-08- 2020-08- 2021-04- 2020-08- 2020-06- 2020-09- 2020-10- 2021-01- 2021-02- 2022-08- under two lots ( Lot I Adama, IDA / 60070 Prior 0.00 improvement in secondary Proposals International Envelope 0 Review 05 21 21 07 21 10 08 30 12 16 10 Dire Dewa and Mekelle and cities Lot II Bahir Dar and Hawasa). Implementing Agency: Water Development Commission. ET-MOWIE-208763-CW-RFB / Procurement of construction and rehabilitation 20 public Component 2: Sanitation and Pending and communal latrines (10 water supply services Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- IDA / 60070 Post Request for Bids Open - National 488,000.00 0.00 Implementat new construction and 10 improvement in secondary Envelope 25 30 29 13 20 16 ion existing latrines rehabilitation) cities for Bahir Dar Town by Bahir Dar Town WSSA ET-MOWIE-208771-CW-RFB / Construction of 22 public Component 2: Sanitation and and communal latrines for Pending water supply services Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-08- Dire Dewa town Under two IDA / 60070 Post Request for Bids Open - National 816,000.00 0.00 Implementat improvement in secondary Envelope 15 20 19 03 03 30 lots (lot I 11 public and lot II ion cities 11 communal) by Dire Dewa WSSE ET-MOWIE-208775-CW-RFB / Construction of civil works Component 2: Sanitation and Pending for completing the sludge water supply services Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- IDA / 60070 Post Request for Bids Open - National 369,000.00 0.00 Implementat drying bed for fecal sludge improvement in secondary Envelope 22 27 26 10 17 13 ion management for Arbaminch cities town by Arbaminch town WSS ET-MOWIE-227378-CW-RFB / Construction of ten(10) Component 2: Sanitation and Pending public and communal toilet water supply services Single Stage - One 2021-04- 2021-05- 2021-06- 2021-06- 2021-07- 2022-01- IDA / 60070 Post Request for Bids Open - National 509,670.00 0.00 Implementat for shashamane town by improvement in secondary Envelope 30 10 09 29 20 16 ion shashamane Water Supply cities and Sewerage Authority ET-MOWIE-143701-CW-RFB / Construction of 32 public and communal latrines under Component 2: Sanitation and Pending two lots ( Lot I #14 and Lot II water supply services Single Stage - One 2021-04- 2021-04- 2021-05- 2021-06- 2021-07- 2022-07- IDA / 60070 Post Request for Bids Open - National 1,600,000.00 0.00 Implementat 18) for Mekelle Town by improvement in secondary Envelope 20 25 25 24 29 29 ion Mekelle Town Water Supply cities and Sewerage Enterprise by Mekelle town WSSE. GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOWIE-43004-GO-DIR / Component 2: Sanitation and Supply of pipes and fittings Under water supply services 2018-01- 2018-01- 2018-02- 2018-05- for the remaining work of Dire IDA / 60070 Prior Direct Selection Direct 1,897,466.00 0.00 Implementati improvement in secondary 12 17 24 25 Dewa City Water Supply and on cities Sanitation Project ET-MOWIE-43329-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 17 16 strengthening on computers) for Gambella City Water Supply and Sewerage Service ET-MOWIE-43286-GO-RFQ / procurement of office equipment (printers, desk top Component 3: Project computers, scanners, photo Request for Single Stage - One 2018-03- 2019-09- 2018-05- 2020-03- 2018-06- 2020-04- IDA / 60070 management & institutional Post Limited 10,000.00 5,098.59 Completed copy machines and lap top Quotations Envelope 22 10 03 21 02 10 strengthening computers)for Deghabur Town Water Supply and Sewerage Service ET-MOWIE-43289-GO-RFQ / procurement of office equipment (printers, desk top Component 3: Project Under computers, scanners, photo Request for Single Stage - One 2018-03- 2020-09- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 22 17 03 02 strengthening on computers) for Arbaminch Town Water Supply and Sewerage Service ET-MOWIE-43291-GO-RFQ / procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 22 03 02 strengthening on computers) for Harar Town Water Supply and Sewerage Service ET-MOWIE-43294-GO-RFQ / procurement of office equipment(printers, desk top Component 3: Project computers, scanners, photo Request for Single Stage - One 2018-03- 2019-11- 2018-05- 2020-06- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 6,182.79 Signed copy machines and lap top Quotations Envelope 29 25 10 23 09 strengthening computers) for Bishoftu Town Water Supply and Sewerage Service Page 2 ET-MOWIE-43297-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 17 16 strengthening on computers) for Shashemane City Water Supply and Sewerage Service ET-MOWIE-43299-GO-RFQ / procurement of office equipment(printers, desk top Component 3: Project computers, scanners, photo Request for Single Stage - One 2018-03- 2017-09- 2018-05- 2020-04- 2018-06- 2020-04- IDA / 60070 management & institutional Post Limited 10,000.00 11,105.57 Completed copy machines and lap top Quotations Envelope 29 11 17 02 16 02 strengthening computers) for Jigjiga City Water Supply and Sewerage Service ET-MOWIE-43300-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 10 09 strengthening on computers) for Hawassa City Water Supply and Sewerage Service ET-MOWIE-43035-GO-RFQ / Procurement of IT equipment Component 3: Project Pending (printers, desk top computers, Request for Single Stage - One 2018-04- 2018-06- 2018-07- IDA / 60070 management & institutional Post Limited 50,000.00 0.00 Implementati scanners, photo copy Quotations Envelope 14 09 09 strengthening on machines and lap top computers) for Ministry PIU ET-MOWIE-43317-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 17 16 strengthening on computers) for Assosa City Water Supply and Sewerage Service ET-MOWIE-43319-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 10 09 strengthening on computers) for Asella City Water Supply and Sewerage Service ET-MOWIE-43322-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 10 09 strengthening on computers) for Sodo City Water Supply and Sewerage Service ET-MOWIE-43324-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project computers, scanners, photo Request for Single Stage - One 2018-03- 2018-12- 2018-05- 2019-02- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 3,436.18 Signed copy machines and lap top Quotations Envelope 29 27 10 07 09 strengthening computers) for Debre Berhan City Water Supply and Sewerage Service ET-MOWIE-43326-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 10 09 strengthening on computers) for Dessie City Water Supply and Sewerage Service ET-MOWIE-43328-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 10 09 strengthening on computers) for Gonder City Water Supply and Sewerage Service ET-MOWIE-43331-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project computers, scanners, photo Request for Single Stage - One 2018-03- 2018-09- 2018-05- 2018-09- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 3,362.55 Signed copy machines and lap top Quotations Envelope 29 06 10 29 09 strengthening computers) for Nekmte City Water Supply and Sewerage Service ET-MOWIE-43333-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project computers, scanners, photo Request for Single Stage - One 2018-03- 2018-09- 2018-05- 2018-11- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 1,386.08 Signed copy machines and lap top Quotations Envelope 29 19 10 03 09 strengthening computers) for Jimma City Water Supply and Sewerage Service ET-MOWIE-43303-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project computers, scanners, photo Request for Single Stage - One 2018-03- 2019-09- 2018-05- 2019-10- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 8,151.84 Signed copy machines and lap top Quotations Envelope 29 26 10 19 09 strengthening computers) for Adama City Water Supply and Sewerage Service ET-MOWIE-43304-GO-RFQ / Procurement of office equipment (printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 10 09 strengthening on computers) for Mekelle City Water Supply and Sewerage Service ET-MOWIE-43307-GO-RFQ / Procurement of office equipment(printers, desk top Component 3: Project Pending computers, scanners, photo Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati copy machines and lap top Quotations Envelope 29 10 09 strengthening on computers) for Bahir Dar City Water Supply and Sewerage Service ET-MOWIE-43310-GO-RFQ / Procurement of office equipment for Dire Dawa City Component 3: Project Pending Water Supply and Sewerage Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati Service(Printers, desk top Quotations Envelope 29 10 09 strengthening on computers, scanners, photo copy machines and lap top computers) ET-MOWIE-43311-GO-RFQ / Procurement of office equipment for Semera City Component 3: Project Pending Water Supply and Sewerage Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati Service(Printers, desk top Quotations Envelope 29 10 09 strengthening on computers, scanners, photo copy machines and lap top computers) ET-MOWIE-43313-GO-RFQ / Procurement of office equipment for Adegrat City Component 3: Project Pending Water Supply and Sewerage Request for Single Stage - One 2018-03- 2018-05- 2018-06- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati Service (printers, desk top Quotations Envelope 29 10 09 strengthening on computers, scanners, photo copy machines and lap top computers) ET-MOWIE-50407-GO-DIR / Component 2: Sanitation and Procurement of Bulk Flow water supply services 2018-02- 2018-04- 2018-03- 2018-04- 2018-07- meter for Mekelle Town Water IDA / 60070 Prior Direct Selection Direct 433,013.00 0.00 Canceled improvement in secondary 28 05 05 06 05 Supply and Sewerage Service cities by Mekelle town WSSS Component 2: Sanitation and ET-MOWIE-55837-GO-RFB / Pending water supply services Single Stage - One 2018-06- 2018-06- 2018-07- 2018-08- 2018-09- 2018-12- Procurement of Automatic IDA / 60070 Post Request for Bids Open - National 250,000.00 0.00 Implementati improvement in secondary Envelope 20 25 25 24 28 27 Water Meter Test Bench on cities Page 3 ET-MOWIE-75633-GO-RFQ / Procurement of office equipment (printers, desk top computers, scanners photocopy machines and Component 3: Project Pending Request for Single Stage - One 2018-09- 2018-11- 2018-12- laptop computers for Amhara IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati Quotations Envelope 15 10 10 Region Water,Irrigation and strengthening on Energy Development Bureau by Amhara Region Water,Irrigation and Energy Development Bureau ET-MOWIE-75634-GO-RFQ / Procurement of office equipment (printers, desk top computers, scanners Component 3: Project Pending photocopy machines and Request for Single Stage - One 2018-09- 2018-11- 2018-12- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati laptop computers for Oromia Quotations Envelope 15 10 10 strengthening on Region Water,Mineral and Energy Bureau by Oromia Region Water,Mineral and Energy Bureau. ET-MOWIE-75635-GO-RFQ / Procurement of office equipment (printers, desk top computers, scanners photocopy machines and Component 3: Project Pending Request for Single Stage - One 2018-09- 2018-11- 2018-12- laptop computers for SNNPR IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati Quotations Envelope 15 10 10 Region Water,Irrigation and strengthening on Energy Development Bureau by SNNPR Region Water,Irrigation and Energy Development Bureau ET-MOWIE-75636-GO-RFQ / Procurement of office equipment (printers, desk top computers, scanners Component 3: Project Pending photocopy machines and Request for Single Stage - One 2018-09- 2018-11- 2018-12- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati laptop computers for Afar Quotations Envelope 15 10 10 strengthening on Region Water Resource Development Bureau by Afar Region Water Resource Development Bureau ET-MOWIE-75637-GO-RFQ / Procurement of office equipment (printers, desk top computers, scanners Component 3: Project Pending photocopy machines and Request for Single Stage - One 2018-09- 2018-11- 2018-12- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati laptop computers for Somali Quotations Envelope 15 10 10 strengthening on Region Water Resource Development Bureau by Somali Region Water Resource Development Bureau ET-MOWIE-75641-GO-RFQ / Procurement of office equipment (printers, desk top computers, scanners photocopy machines and Component 3: Project Pending laptop computers for Request for Single Stage - One 2018-09- 2018-11- 2018-12- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati Gambella Region Quotations Envelope 15 10 10 strengthening on Water,Irrigation and Energy Development Bureau by Gambella Region Water,Irrigation and Energy Development Bureau ET-MOWIE-75643-GO-RFQ / Procurement of office equipment (printers, desk top computers, scanners photocopy machines and Component 3: Project Pending laptop computers for Request for Single Stage - One 2018-09- 2018-11- 2018-12- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati Benshangul Gumuz Region Quotations Envelope 15 10 10 strengthening on Water,Irrigation and Energy Development Bureau by Benshangul Region Water,Irrigation and Energy Development Bureau ET-MOWIE-75646-GO-RFQ / Procurement of Office Equipment (printers, desktop Component 3: Project Pending computers, scanners, Request for Single Stage - One 2018-09- 2018-11- 2018-12- IDA / 60070 management & institutional Post Limited 10,000.00 0.00 Implementati photocopy machines and Quotations Envelope 15 10 10 strengthening on laptop computers) for Tigray Region Water Bureau by Tigray Region Water Bureau ET-MOWIE-84615-GO-RFB / Procurement of 44 Double Component 3: Project Open - Single Stage - One 2018-11- 2019-02- 2018-11- 2019-02- 2019-01- 2019-04- 2019-01- 2019-07- 2019-03- 2019-09- 2019-09- 2020-06- Cup vehicles for 22 Secondary IDA / 60080 management & institutional Prior Request for Bids 1,800,000.00 1,412,937.01 Completed International Envelope 15 02 20 27 01 15 31 10 07 05 03 29 Cities, Regional Water Bureaus strengthening PMU, and Federal PMU ET-MOWIE-98176-GO-RFB / Supply and Installation Component 2: Sanitation and Equipment for Water Quality Pending water supply services Open - Single Stage - One 2019-03- 2019-03- 2019-04- 2019-05- 2019-07- 2019-11- Laboratory and Training IDA / 60070 Post Request for Bids 1,000,000.00 0.00 Implementati improvement in secondary International Envelope 14 19 30 30 04 01 Center for Mekelle Town Water on cities Supply Project by Mekelle Town Water Supply Office ET-MOWIE-143211-GO-RFB / Procurement of 25 (twenty five ) 10m3 and 8m3 size Component 2: Sanitation and Under vacuum track for 5 towns( water supply services Open - Single Stage - One 2019-11- 2020-08- 2019-11- 2020-09- 2020-01- 2020-11- 2020-02- 2021-04- 2020-03- 2020-09- IDA / 60070 Prior Request for Bids 5,500,000.00 0.00 Implementati Adama,Mekele,Diredewa, improvement in secondary International Envelope 29 19 30 01 14 22 13 23 19 15 on Bahirdar ,and Hawasa) of cities UWSSP-2 By Water Development Commission . ET-MOWIE-156913-GO-RFB / procurement of 44 (forty- Component 2: Sanitation and four) Motorcycles for 22 water supply services Single Stage - One 2020-02- 2020-07- 2020-03- 2020-04- 2020-07- 2020-05- 2020-12- 2020-06- 2020-12- Towns of Urban Water Supply IDA / 60070 Post Request for Bids Open - National 180,000.00 0.00 Canceled improvement in secondary Envelope 12 07 13 12 21 12 23 16 13 and Sanitation project II cities (UWSSP-2) by Water Development Commission ET-MOWIE-166460-GO-DIR / Procurement of IT Equipment (E-video (ten in number) Modem with subscription 4GB Component 3: Project Pending and Fixed Wireless Broadband 2020-03- 2020-04- 2020-05- 2020-06- IDA / 60070 management & institutional Post Direct Selection Direct 3,600.00 0.00 Implementati (WIFI) (3) three apparatuses for 30 04 09 18 strengthening on water Development Commission offices and Staffs will be implemented by WDC ET-MOWIE-166453-GO-RFQ / Procurement of Core i7 7 Component 3: Project Pending (seven) Laptops for Water Request for Single Stage - One 2020-04- 2020-05- 2020-07- IDA / 60070 management & institutional Post Limited 10,937.50 0.00 Implementati Development commission Quotations Envelope 04 30 29 strengthening on Staffs which will be implemented by WDC. ET-MOWIE-168265-GO-RFB / procurement of pipes and Component 2: Sanitation and fittings, water meters and leak Under water supply services Open - Single Stage - One 2020-04- 2020-01- 2020-05- 2020-06- 2021-02- 2020-07- 2021-04- 2020-08- 2020-12- detection equipment for IDA / 60070 Post Request for Bids 907,000.00 0.00 Implementati improvement in secondary International Envelope 30 29 05 04 03 04 29 08 06 Gonder town Water Supply and on cities Sewerage service enterprise by Gonder town WSSE ET-MOWIE-172211-GO-RFQ Component 2: Sanitation and / Procurement of Pipes and water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-07- 2020-07- 2020-08- fittings and water meters for IDA / 60070 Post Limited 75,800.00 60,209.31 Signed improvement in secondary Quotations Envelope 20 06 15 22 14 Arbaminch Town WSSE by cities Arbaminch town WSSE ET-MOWIE-172215-GO-RFQ Component 2: Sanitation and / Procurement of Pipes and water supply services Request for Single Stage - One 2020-05- 2020-06- 2020-07- 2020-07- 2020-08- fittings and water meters for IDA / 60070 Post Limited 75,700.00 61,772.81 Signed improvement in secondary Quotations Envelope 20 29 15 03 14 Wolaita Sodo Town WSSE by cities Wolaita town WSSE ET-MOWIE-172221-GO-RFQ Component 2: Sanitation and / Procurement of Pipes and Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-08- fittings Hawasa Town WSSE by IDA / 60070 Post Limited 75,800.00 0.00 Implementati improvement in secondary Quotations Envelope 20 15 14 Hawasa town WSSE for low on cities income area Page 4 ET-MOWIE-172233-GO-RFQ / Procurement of HDPE Pipes Component 2: Sanitation and Pending and fittings and water meters water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-08- IDA / 60070 Post Limited 75,800.00 0.00 Implementati for Debre Brerhan Town WSSE improvement in secondary Quotations Envelope 20 15 14 on by DebreBerhan town WSSE for cities low income area ET-MOWIE-172236-GO-RFQ Component 2: Sanitation and / Procurement of Pipes and Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-08- fittings for Dessie Town WSSE IDA / 60070 Post Limited 75,700.00 0.00 Implementati improvement in secondary Quotations Envelope 20 15 14 by Dessie town WSSE for low on cities income area ET-MOWIE-172241-GO-RFQ Component 2: Sanitation and / Procurement of Pipes and water supply services Request for Single Stage - One 2020-05- 2020-01- 2020-07- 2020-03- 2020-08- fittings for Gonder Town WSSE IDA / 60070 Post Limited 75,800.00 39,738.87 Signed improvement in secondary Quotations Envelope 23 29 18 17 17 by Gonder town WSSE for low cities income area ET-MOWIE-172244-GO-RFQ Component 2: Sanitation and / Procurement of Pipes and Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-08- fittings for Bahir Dar Town low IDA / 60070 Post Limited 75,800.00 0.00 Implementati improvement in secondary Quotations Envelope 20 15 14 income area WSSE by Bahir Dar on cities town WSSE ET-MOWIE-172245-GO-RFQ / Procurement of HDPE Pipes Component 2: Sanitation and Pending and fittings and water meters water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-08- IDA / 60070 Post Limited 75,690.00 0.00 Implementati for Bishftu Town WSSE by improvement in secondary Quotations Envelope 25 20 19 on Bishftu town WSSE for low cities income area ET-MOWIE-172248-GO-RFQ / Procurement of HDPE Pipes Component 2: Sanitation and Pending and fittings and Water meters water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-08- IDA / 60070 Post Limited 74,980.00 0.00 Implementati for Jimma Town WSSE by improvement in secondary Quotations Envelope 25 20 19 on Jimma town WSSE for low cities income area ET-MOWIE-172256-GO-RFQ / Procurement of pipes and Component 2: Sanitation and Pending fittings, leak detection and water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-09- IDA / 60070 Post Limited 75,800.00 0.00 Implementati water quality test equipment improvement in secondary Quotations Envelope 25 20 18 on for Assela town low income cities area by Assela town WSSE ET-MOWIE-172257-GO-RFQ / Supply and installation of Component 2: Sanitation and Pending pipes and fittings for Mekelle water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-10- IDA / 60070 Post Limited 75,800.00 0.00 Implementati town low income area water improvement in secondary Quotations Envelope 20 15 13 on supply project by Mekelle cities town WSSP ET-MOWIE-172262-GO-RFQ / Procurement of pipes and Component 2: Sanitation and Pending fittings for Gambella town water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-09- IDA / 60070 Post Limited 75,800.00 0.00 Implementati town low income area water improvement in secondary Quotations Envelope 25 20 18 on supply project by Gambella cities town WSSP ET-MOWIE-172263-GO-RFQ Component 2: Sanitation and / Procurement of pipe fittings Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-08- for Asosa town low income IDA / 60070 Post Limited 5,000.00 0.00 Implementati improvement in secondary Quotations Envelope 25 20 19 area water supply project by on cities Asosa WSSE ET-MOWIE-172265-GO-RFQ Component 2: Sanitation and / procurement of pipes and Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-09- fittings for Harar town low IDA / 60070 Post Limited 69,500.00 0.00 Implementati improvement in secondary Quotations Envelope 25 20 18 income area water supply on cities project by Harar town WSSE ET-MOWIE-172275-GO-RFQ Component 2: Sanitation and / supply of pipes and fittings Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-09- for Semera Logia town low IDA / 60070 Post Limited 72,500.00 0.00 Implementati improvement in secondary Quotations Envelope 31 26 24 income area water supply on cities project by Semera Logia WSSE ET-MOWIE-172933-GO-RFQ / Procurement of pipes and Component 2: Sanitation and Pending fittings for Dire Dewa town water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-09- IDA / 60070 Post Limited 75,800.00 0.00 Implementati low income area water supply improvement in secondary Quotations Envelope 30 25 23 on project by Dire Dewa Town cities WSSE ET-MOWIE-168264-GO-RFB / Procurement of Water meters, Bulk flow meters, Component 2: Sanitation and Under pipes and fittings and leak water supply services Open - Single Stage - One 2020-05- 2021-03- 2020-06- 2020-07- 2020-08- 2020-09- 2021-01- IDA / 60070 Post Request for Bids 1,565,000.00 0.00 Implementati detection Equipments for Jima improvement in secondary International Envelope 28 16 02 02 01 05 03 on Town Water Supply and cities Sewerage Enterprise by Jima town WSSE ET-MOWIE-174562-GO-RFQ / Procurement of Aluminium sulfate for covid-19 Component 2: Sanitation and intervention in Gmbella water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-07- IDA / 60070 Post Limited 46,154.00 0.00 Canceled towns health stations, improvement in secondary Quotations Envelope 31 05 19 hospitals, isolation centers cities and areas with acute waster supply shortage by WDC ET-MOWIE-174573-GO-RFQ Component 2: Sanitation and / Procurement of filter media water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-07- Sand for Gambella town Water IDA / 60070 Post Limited 46,154.00 0.00 Canceled improvement in secondary Quotations Envelope 31 05 19 Treatment plant by Gambella cities Town Water Utility ET-MOWIE-175708-GO-RFQ / Procurement of Pipes and Component 2: Sanitation and Pending fittings for Adama town low water supply services Request for Single Stage - One 2020-06- 2020-07- 2020-08- IDA / 60070 Post Limited 76,900.00 0.00 Implementati income area water supply improvement in secondary Quotations Envelope 10 15 14 on project by Adama town Water cities Utility ET-MOWIE-43018-GO-RFB / Procurement of 44 vehicles(double Cabins) for secondary city utilities, Component 3: Project 2018-06- 2018-06- 2018-07- 2018-11- Regional Water Bureaus and 2 IDA / 60070 management & institutional Prior Direct Selection Direct 1,800,000.00 0.00 Canceled 20 25 30 27 Vehicles( double Cabins) for strengthening Ministry PIU by the Ministry of Water Irrigation and Electricity through UNOPS ET-MOWIE-181638-GO-RFB / Procurement of Pipes and Fittings for covid-19 Component 2: Sanitation and Under intervention in 13 towns water supply services Open - Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-08- 2020-09- 2020-12- IDA / 60070 Post Request for Bids 573,766.00 0.00 Implementati health stations, hospitals, improvement in secondary International Envelope 06 04 11 08 01 15 05 04 on isolation centers and areas cities with acute waster supply shortage by WDC ET-MOWIE-174564-GO-RFQ / Procurement of Water Component 2: Sanitation and treatment Chemicals and water supply services Request for Single Stage - One 2020-07- 2020-08- 2020-08- Reagents for covid-19 IDA / 60070 Post Limited 110,769.00 0.00 Canceled improvement in secondary Quotations Envelope 11 15 29 intervention in Bonga town cities to areas with acute waster supply shortage by WDC ET-MOWIE-181653-GO-RFQ Component 2: Sanitation and Pending / Procurement of pipe fittings water supply services Request for Single Stage - One 2020-07- 2020-08- 2020-09- IDA / 60070 Post Limited 2,700.00 0.00 Implementati for Harar town water supply improvement in secondary Quotations Envelope 11 29 12 on project by Harar town cities ET-MOWIE-181625-GO-RFB / Procurement of Electromechanical Equipment (59 submersible water pumps Component 2: Sanitation and (lot I) ,11 surface pumps (lot Under water supply services Open - Single Stage - One 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-10- 2020-08- 2020-09- 2020-12- II) ,2 Surge Vessels (Lot III) IDA / 60070 Post Request for Bids 4,139,530.00 0.00 Implementati improvement in secondary International Envelope 08 04 13 08 03 21 17 07 06 and 29 Generators (lot IV) for on cities 25 towns covid-19 intervention in acute water supply shortage areas by WDC. ET-MOWIE-183159-GO-DIR / Component 2: Sanitation and Procurement of filter media Pending water supply services 2020-07- 2020-07- 2020-08- 2020-09- Sand for Gambella town Water IDA / 60070 Post Direct Selection Direct 46,154.00 0.00 Implementati improvement in secondary 15 20 10 09 Treatment plant by Gambella on cities Town Water Utility Page 5 ET-MOWIE-185679-GO-RFQ / Procurement of Office Equipment (#12 laptop Component 3: Project Pending computers, #1 Led Projector, Request for Single Stage - One 2020-08- 2020-10- 2020-10- IDA / 60070 management & institutional Post Limited 50,000.00 0.00 Implementati #2 Heavy duty color printers, Quotations Envelope 10 05 20 strengthening on #1 scanner and #1 heavy duty photo copy machine) for WDC PIU by WDC ET-MOWIE-208762-GO-RFB / Procurement of pipes and Component 2: Sanitation and Pending fitting for expansion of water water supply services Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-05- IDA / 60070 Post Request for Bids Open - National 132,000.00 0.00 Implementati supply system to low income improvement in secondary Envelope 21 26 25 09 02 01 on area of Mekelle town by cities Mekelle town WSS ET-MOWIE-208765-GO-RFQ / Procurement of pipes and Component 2: Sanitation and Pending fitting for expansion of water water supply services Request for Single Stage - One 2021-01- 2021-03- 2021-03- IDA / 60070 Post Limited 65,000.00 0.00 Implementati supply system for unserved improvement in secondary Quotations Envelope 04 01 31 on low income area by Bahir Dar cities WSS ET-MOWIE-208767-GO-RFB / Procurement of pipes and Component 2: Sanitation and Pending fittings for expansion of water water supply services Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-04- IDA / 60070 Post Request for Bids Open - National 132,000.00 0.00 Implementati supply system for unserved improvement in secondary Envelope 21 26 25 09 02 01 on low income are for Adama cities town by Adama town WSSE ET-MOWIE-208769-GO-RFB / Procurement of pipes and Component 2: Sanitation and Pending fittings for expansion of water water supply services Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-05- IDA / 60070 Post Request for Bids Open - National 132,000.00 0.00 Implementati supply system for unserved improvement in secondary Envelope 22 27 26 10 03 02 on low income area of Hawasa cities town by Hawasa town WSSE ET-MOWIE-208770-GO-RFB / Procurement of pipes and Component 2: Sanitation and Pending fittings for expansion of water water supply services Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-05- IDA / 60070 Post Request for Bids Open - National 132,000.00 0.00 Implementati supply system for unserved improvement in secondary Envelope 22 27 26 10 03 02 on low income area of Dire Dewa cities town by Dire Dewa town WSSE ET-MOWIE-208774-GO-RFQ / procurement of pumps and Component 2: Sanitation and Pending generators for Debre Birhan water supply services Request for Single Stage - One 2021-01- 2021-02- 2021-03- IDA / 60070 Post Limited 79,000.00 0.00 Implementati town Water Supply Project by improvement in secondary Quotations Envelope 10 21 23 on Debre Birhan town Dar Town cities WSSE ET-MOWIE-220715-GO-RFB / Procurement of operational service improvement equipment's under two lots ( Component 2: Sanitation and lot I Water Meters, lot II leak water supply services Open - Single Stage - One 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2021-11- IDA / 60070 Prior Request for Bids 8,900,000.00 0.00 Under Review detection equipment, welding improvement in secondary International Envelope 10 15 26 26 30 27 machines, Bulk flow meters, cities and test bench) for improvement of 22 town Water supply projects by WDC ET-MOWIE-220716-GO-RFB / procurement of pipes and Component 2: Sanitation and Under fittings for 22 towns water water supply services Open - Single Stage - One 2021-03- 2021-06- 2021-03- 2021-06- 2021-04- 2021-05- 2021-06- 2021-11- IDA / 60070 Prior Request for Bids 2,800,000.00 0.00 Implementati supply projects operational improvement in secondary International Envelope 10 04 15 21 26 26 30 27 on efficiency improvement by cities WDC ET-MOWIE-221971-GO-DIR / Procurement of Water Component 2: Sanitation and treatment Chemicals and Pending water supply services 2021-03- 2021-03- 2021-04- 2021-06- Reagents for covid-19 IDA / 60070 Post Direct Selection Direct 110,769.00 0.00 Implementati improvement in secondary 01 06 10 09 intervention in Bonga town on cities to areas with acute waster supply shortage by WDC ET-MOWIE-221972-GO-DIR / Procurement of Aluminium sulfate for covid-19 Component 2: Sanitation and Pending intervention in Gmbella towns water supply services 2021-03- 2021-03- 2021-04- 2021-06- IDA / 60070 Post Direct Selection Direct 46,154.00 0.00 Implementati health stations, hospitals, improvement in secondary 01 06 10 09 on isolation centers and areas cities with acute waster supply shortage by WDC ET-MOWIE-221973-GO-UN / Procurement of Electromechanical Equipment Component 2: Sanitation and Under (59 submersible water pumps water supply services UN Agencies 2021-03- 2021-04- 2021-03- 2021-04- 2021-04- 2021-07- IDA / 60070 Post Direct 1,500,000.00 0.00 Implementati (lot I) and 11 surface pumps improvement in secondary (Direct) 02 17 07 17 11 10 on (lot II) ) for 25 towns covid- cities 19 intervention in acute water supply shortage ET-MOWIE-228528-GO-RFB- RE-BID / Procurement of 44 Component 3: Project Pending Motorcycles for 22 Towns of Single Stage - One 2021-04- 2021-05- 2021-06- 2021-06- 2021-07- 2021-11- IDA / 60070 management & institutional Post Request for Bids Open - National 150,000.00 0.00 Implementati Urban Water Supply and Envelope 30 05 04 19 24 21 strengthening on Sanitation Project II (UWSSP-2) by WDC (Re-bid) ET-MOWIE-232948-GO-DIR / Procurement of Electromechanical Equipment lot I (# 4 water pump motors, Component 2: Sanitation and #6 surface pumps, #7 Pending water supply services 2021-05- 2021-05- 2021-07- 2021-10- submersible pumps), lot II (# IDA / 60070 Post Direct Selection Direct 1,179,000.00 0.00 Implementati improvement in secondary 25 30 04 02 12 Generators) lot III control on cities panel parts for Mekelle and Adegarat towns water utilities emergency situation by WDC from UNOPS. ET-MOWIE-232953-GO-RFQ / Procurement of water quality Component 2: Sanitation and Pending chemicals and instruments for water supply services Request for Single Stage - One 2021-06- 2021-08- 2021-08- IDA / 60070 Post Limited 70,000.00 0.00 Implementati Mekelle town Water supply improvement in secondary Quotations Envelope 15 10 25 on service emergency situation cities by WDC ET-MOWIE-232956-GO-RFQ Component 2: Sanitation and / Procurement of riser pipes Pending water supply services Request for Single Stage - One 2021-05- 2021-07- 2021-08- for Mekelle town water supply IDA / 60070 Post Limited 78,050.00 0.00 Implementati improvement in secondary Quotations Envelope 17 12 11 service emergency situation on cities by WDC ET-MOWIE-232961-GO-RFQ / Procurement of Office Component 2: Sanitation and Pending Furniture (#72 chairs and #25 water supply services Request for Single Stage - One 2021-05- 2021-07- 2021-09- IDA / 60070 Post Limited 28,000.00 0.00 Implementati tables) for Adegarat town improvement in secondary Quotations Envelope 25 20 18 on water utility by Tigray Region cities Water Bureau ET-MOWIE-232977-GO-RFQ Component 2: Sanitation and / Procurement of #2 Pending water supply services Request for Single Stage - One 2021-05- 2021-07- 2021-08- Generator batters for Mekelle IDA / 60070 Post Limited 1,000.00 0.00 Implementati improvement in secondary Quotations Envelope 26 21 05 town water utility by Mekelle on cities town utility ET-MOWIE-232959-GO-RFQ / procurement of Office equipment lot I (#48 desk top Component 2: Sanitation and Pending computers and #13 laptop water supply services Request for Single Stage - One 2021-06- 2021-08- 2021-09- IDA / 60070 Post Limited 143,000.00 0.00 Implementati computers) and lot II (#1 fax improvement in secondary Quotations Envelope 20 15 14 on machine, #2 Scanners and # 2 cities printers) for Adegarat town utility by WDC. NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOWIE-174570-NC-RFQ Component 2: Sanitation and / Procurement of maintenance Pending water supply services Request for Single Stage - One 2020-05- 2020-07- 2020-07- service of Generators and IDA / 60070 Post Limited 30,769.00 0.00 Implementati improvement in secondary Quotations Envelope 31 05 19 transformer for shire town by on cities shire town Water Utility CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Page 6 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOWIE-43244-CS-QCBS / Consultancy service for Development of an integrated Component 2: Sanitation and City Wide Sanitation plan and water supply services Quality And Cost- 2018-07- 2018-05- 2018-07- 2018-03- 2018-07- 2018-12- 2018-09- 2018-01- 2018-11- 2019-04- 2018-12- 2019-07- 2019-09- Feasibility Study and Detail IDA / 60070 Post Open - National 250,000.00 214,456.00 Signed 2018-04-20 improvement in secondary Based Selection 17 11 01 03 29 31 27 15 08 27 20 04 16 Design of Waste Water cities Management System for Harari town by Harari Town water supply and sewerage service ET-MOWIE-50559-CS-QCBS / Consultancy Service for Establishment of Urban Water Component 2: Sanitation and Supply and Waste Water water supply services Quality And Cost- Under 2018-07- 2018-09- 2018-09- 2018-10- 2018-12- 2019-01- 2020-01- IDA / 60070 Post Open - National 200,000.00 0.00 2018-06-20 Management Service improvement in secondary Based Selection Implementation 20 02 30 30 04 08 08 Regulation in Ethiopia by cities Ministry of Water Irrigation and Electricity ET-MOWIE-43193-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- Open - 2018-08- 2018-07- 2018-10- 2018-08- 2019-06- 2018-09- 2019-09- 2018-10- 2020-02- 2018-11- 2020-09- 2018-12- 2020-10- 2019-09- IDA / 60070 Prior 600,000.00 995,043.88 Signed 2018-06-20 Design of Waste Water improvement in secondary Based Selection International 10 11 03 24 27 21 02 21 12 25 03 30 01 26 Management System for cities Jimma and Nekemte Towns by Oromia Water Mineral and Energy Bureau ET-MOWIE-43212-CS-QCBS / Consultancy Service for Development of an Integrated Component 2: Sanitation and City Wide Sanitation plan and water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Feasibility Study and Detail improvement in secondary Based Selection 11 01 29 27 08 20 16 Design for Asella Town WSSS cities by Asella Town water supply and sewerage service ET-MOWIE-43209-CS-QCBS / Consultancy Service for Development of an Integrated Component 2: Sanitation and City Wide Sanitation plan and water supply services Quality And Cost- Under 2018-04- 2018-05- 2018-06- 2018-08- 2018-10- 2018-11- 2019-08- IDA / 60070 Post Open - National 500,000.00 0.00 2018-03-20 Feasibility Study and Detail improvement in secondary Based Selection Implementation 10 31 28 27 08 19 16 Design for Sodo and cities Arbaminch Towns by SNNPR Water Bureau ET-MOWIE-43208-CS-QCBS / Consultancy Service for Development of an Integrated Component 2: Sanitation and City Wide Sanitation plan and water supply services Quality And Cost- 2018-04- 2018-05- 2018-06- 2018-08- 2018-10- 2018-11- 2019-08- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-03-20 Feasibility Study and Detail improvement in secondary Based Selection 10 31 28 27 01 12 09 Design for Sodo Town WSSS by cities Sodo Town water supply and sewerage service ET-MOWIE-43214-CS-QCBS / Consultancy service for Development of an integrated Component 2: Sanitation and City Wide Sanitation plan and water supply services Quality And Cost- 2018-08- 2018-05- 2018-07- 2018-08- 2018-07- 2019-03- 2018-09- 2019-06- 2018-11- 2019-09- 2018-12- 2019-09- 2019-09- Feasibility Study and Detail IDA / 60070 Post Open - National 250,000.00 217,285.63 Signed 2018-04-20 improvement in secondary Based Selection 01 11 01 01 29 09 27 03 08 18 20 27 16 Design of Waste Water cities Management System for Adegrat town by Tigray Region Water Bureau ET-MOWIE-43206-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Dessie town by Dessie Town water supply and sewerage service ET-MOWIE-43200-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Gambella town by Gambella Town water supply and sewerage service ET-MOWIE-43198-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-06- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 24 22 20 01 13 09 Management System for cities Nekemet town by Nekemet Town water supply and sewerage service ET-MOWIE-43237-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Jigjiga town by Jigijiga Town water supply and sewerage service ET-MOWIE-43239-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Shashemene town by Shashemene Town water supply and sewerage service ET-MOWIE-43216-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Semera town by Semera Town water supply and sewerage service ET-MOWIE-43241-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Bishoftu town by Bishoftu Town water supply and sewerage service ET-MOWIE-43059-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Deghabur town by Deghabur Town water supply and sewerage service ET-MOWIE-43248-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Arbaminch town by Arbaminch Town water supply and sewerage service Page 7 ET-MOWIE-43203-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Design of Waste Water improvement in secondary Based Selection 11 01 29 27 08 20 16 Management System for cities Gonder town by Gonder Town water supply and sewerage service ET-MOWIE-65731-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- Open - 2018-08- 2018-07- 2018-09- 2018-08- 2019-01- 2018-09- 2019-03- 2018-10- 2019-08- 2018-11- 2019-12- 2018-12- 2019-12- 2019-09- IDA / 60080 Prior 900,000.00 1,246,690.99 Signed 2018-06-20 Design of Waste Water improvement in secondary Based Selection International 06 11 04 24 14 21 05 21 30 25 08 30 18 26 Management System for cities Gambella, Semera and Asosa Towns by Ministry of Water Irrigation and Electricity ET-MOWIE-65735-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- Open - Under 2018-08- 2018-07- 2018-10- 2018-09- 2019-08- 2018-09- 2019-11- 2018-10- 2020-02- 2018-12- 2020-09- 2019-01- 2019-10- Design of Waste Water IDA / 60080 Prior 900,000.00 0.00 2018-06-28 improvement in secondary Based Selection International Implementation 10 19 05 01 14 29 12 29 26 03 22 07 04 Management System for cities Asella, Shashemene and Bishoftu towns by Oromia Water, Mineral and Energy Bureau ET-MOWIE-65737-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- Open - 2018-08- 2018-07- 2018-10- 2018-09- 2019-06- 2018-09- 2019-09- 2018-10- 2019-12- 2018-12- 2020-06- 2019-01- 2020-08- 2019-10- IDA / 60080 Prior 900,000.00 1,163,667.22 Signed 2018-06-28 Design of Waste Water improvement in secondary Based Selection International 10 19 14 01 27 29 17 29 08 03 02 07 21 04 Management System for cities Gonder, Dessie and Debreberhan towns by Amehara Water Bureau ET-MOWIE-65751-CS-QCBS / Consultancy service for Development of an integrated Component 2: Sanitation and City Wide Sanitation plan and water supply services Quality And Cost- Open - Under 2018-08- 2018-07- 2018-10- 2018-08- 2020-02- 2018-09- 2020-05- 2018-10- 2020-12- 2018-11- 2021-02- 2018-12- 2019-09- Feasibility Study and Detail IDA / 60080 Prior 600,000.00 0.00 2018-06-20 improvement in secondary Based Selection International Implementation 10 11 17 24 16 21 21 21 16 25 22 30 26 Design of Waste Water cities Management System for Sodo and Arbaminch Towns by SNNPR Water Bureau ET-MOWIE-65753-CS-QCBS / Consultancy service for Development of an integrated City Wide Sanitation plan and Component 2: Sanitation and Feasibility Study and Detail water supply services Quality And Cost- Open - 2018-08- 2018-07- 2018-10- 2018-08- 2019-07- 2018-09- 2019-09- 2018-10- 2019-10- 2018-12- 2020-05- 2019-01- 2020-06- 2019-10- IDA / 60080 Prior 600,000.00 1,279,278.48 Signed 2018-06-26 Design of Waste Water improvement in secondary Based Selection International 06 17 05 30 16 27 05 27 31 01 30 05 30 02 Management System for Jijiga cities and Deghabur Towns by Somali Region Water Resource Development Bureau ET-MOWIE-43213-CS-QCBS / Consultancy Service for Development of an Integrated Component 2: Sanitation and City Wide Sanitation plan and water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-09- 2018-11- 2018-12- 2019-09- IDA / 60070 Post Open - National 250,000.00 0.00 Canceled 2018-04-20 Feasibility Study and Detail improvement in secondary Based Selection 11 01 29 27 08 20 16 Design for Aossosa Town cities WSSS by Assosa Town water supply and sewerage service ET-MOWIE-55840-CS-QCBS / Procurement of re-innovation Component 2: Sanitation and of Enterprise level Information water supply services Quality And Cost- Pending 2018-07- 2018-08- 2018-09- 2018-10- 2018-11- 2018-12- 2019-12- IDA / 60070 Post Open - National 250,000.00 0.00 2018-06-20 Management System by improvement in secondary Based Selection Implementation 11 24 21 21 25 30 30 Mekele Town Water Supply cities and Sewerage Service ET-MOWIE-43218-CS-QCBS / Consultancy service for Component 2: Sanitation and Development of an integrated water supply services Quality And Cost- 2018-04- 2018-05- 2018-06- 2018-08- 2018-10- 2018-11- 2019-08- Town Sanitation plan for Dire IDA / 60070 Post Open - National 200,000.00 0.00 Canceled 2018-03-20 improvement in secondary Based Selection 10 31 28 27 08 19 16 Dewa town by Dire Dawa cities Town water supply and sewerage service ET-MOWIE-43231-CS-QCBS / Consultancy service for Component 2: Sanitation and Development of an integrated water supply services Quality And Cost- 2018-04- 2018-05- 2018-06- 2018-08- 2018-10- 2018-11- 2019-08- Town Sanitation plan for IDA / 60070 Post Open - National 200,000.00 0.00 Canceled 2018-03-20 improvement in secondary Based Selection 10 31 28 27 01 12 09 Adama town by Adama Town cities water supply and sewerage service ET-MOWIE-43234-CS-QCBS / Consultancy service for Component 2: Sanitation and Development of an integrated water supply services Quality And Cost- 2018-04- 2018-05- 2018-06- 2018-08- 2018-10- 2018-11- 2019-08- Town Sanitation plan for IDA / 60070 Post Open - National 200,000.00 0.00 Canceled 2018-03-20 improvement in secondary Based Selection 10 31 28 27 01 12 09 Hawassa town by Hawassa cities Town water supply and sewerage service ET-MOWIE-43227-CS-QCBS / Consultancy service for Component 2: Sanitation and Development of an integrated water supply services Quality And Cost- 2018-04- 2018-05- 2018-06- 2018-08- 2018-10- 2018-11- 2019-08- Town Sanitation plan for IDA / 60070 Post Open - National 200,000.00 0.00 Canceled 2018-03-20 improvement in secondary Based Selection 10 31 28 27 08 19 16 Mekelle town by Mekelle Town cities water supply and sewerage service ET-MOWIE-43222-CS-QCBS / Consultancy service for Component 2: Sanitation and Development of an integrated water supply services Quality And Cost- 2018-05- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- 2019-08- City Wide Sanitation plan for IDA / 60070 Post Open - National 200,000.00 0.00 Canceled 2018-04-20 improvement in secondary Based Selection 11 01 29 28 09 20 17 Bahir Dar town by Bahir Dar cities Town water supply and sewerage service ET-MOWIE-77764-CS-QCBS / consultancy service for Component 2: Sanitation and preparation of business plan water supply services Quality And Cost- 2018-10- 2018-12- 2018-12- 2019-01- 2019-03- 2019-04- 2019-08- for Jima, Nekemte and IDA / 60070 Post Open - National 110,000.00 0.00 Canceled 2018-09-27 improvement in secondary Based Selection 18 01 29 28 04 08 06 Bishoftu Towns Water Supply cities project by Oromia Water, Mineral and Energy Bureau ET-MOWIE-75929-CS-QCBS / Selection and employment of consultant for situational Component 2: Sanitation and assessment and development water supply services Quality And Cost- 2018-10- 2018-12- 2018-12- 2019-01- 2019-03- 2019-04- 2019-08- IDA / 60070 Post Open - National 110,000.00 0.00 Canceled 2018-09-27 of NRW reduction and improvement in secondary Based Selection 18 01 29 28 04 08 06 management interventions for cities Jigjiga and Deghabur towns by Somali Region Water Bureau ET-MOWIE-75924-CS-QCBS / Selection and employment of consultant for situational Component 2: Sanitation and assessment and development water supply services Quality And Cost- 2018-10- 2018-12- 2018-12- 2019-01- 2019-03- 2019-04- 2019-10- of NRW reduction and IDA / 60070 Post Open - National 110,000.00 0.00 Canceled 2018-09-27 improvement in secondary Based Selection 18 01 29 28 04 08 05 management interventions for cities Bahirdar, D/berhan and Dessie towns by Amhara Water Bureau ET-MOWIE-77752-CS-QCBS / Consultancy service for Component 2: Sanitation and preparation of business plan water supply services Quality And Cost- 2018-10- 2018-12- 2018-12- 2019-01- 2019-03- 2019-04- 2019-08- for Mekele and Adegrat towns IDA / 60070 Post Open - National 110,000.00 0.00 Canceled 2018-09-27 improvement in secondary Based Selection 18 01 29 28 04 08 06 Water supply and Sewerage cities authorities by Tigray Region Water Bureau ET-MOWIE-75935-CS-QCBS / Selection and employment of consultant for situational Component 2: Sanitation and assessment and development water supply services Quality And Cost- 2018-10- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-07- IDA / 60070 Post Open - National 50,000.00 0.00 Canceled 2018-10-02 of NRW reduction and improvement in secondary Based Selection 23 06 03 02 09 13 12 management interventions for cities Harari town by Harari water supply and sewerage service Page 8 ET-MOWIE-77885-CS-QCBS / Consultancy Service for Component 2: Sanitation and preparation of Business plan water supply services Quality And Cost- 2018-10- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-08- for Adama, Asella and IDA / 60070 Post Open - National 110,000.00 0.00 Canceled 2018-10-05 improvement in secondary Based Selection 26 09 06 05 12 16 14 Shashamene towns by Oromia cities Water Mineral and Energy Bureau ET-MOWIE-75932-CS-QCBS / Selection and employment of consultant for Consultancy service for preparation of Component 2: Sanitation and business plan and NRW water supply services Quality And Cost- Pending 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-09- IDA / 60070 Post Open - National 130,000.00 0.00 2018-11-15 Reduction strategic plan and improvement in secondary Based Selection Implementation 06 19 16 18 22 27 24 implementation mechanisms cities for Soda, Hawasa and Arbamich towns by SNNP reginal water bureaus ET-MOWIE-75927-CS-QCBS / Selection and employment of consultant for situational Component 2: Sanitation and assessment and development water supply services Quality And Cost- 2018-10- 2018-12- 2018-12- 2019-01- 2019-03- 2019-04- 2019-10- IDA / 60070 Post Open - National 110,000.00 0.00 Canceled 2018-09-27 of NRW reduction and improvement in secondary Based Selection 18 01 29 28 04 08 05 management interventions for cities Gambella, Semera and Asosa towns by MoWIE ET-MOWIE-84640-CS-QCBS / Component 2: Sanitation and Consultancy Service for water supply services Quality And Cost- Open - Under 2018-12- 2018-12- 2019-02- 2019-02- 2019-11- 2019-03- 2020-04- 2019-04- 2020-06- 2019-05- 2021-06- 2019-06- 2020-06- Preparation of Urban Water IDA / 60080 Prior 540,000.00 0.00 2018-11-30 improvement in secondary Based Selection International Implementation 05 21 14 03 27 03 03 02 09 07 01 11 10 Supply Study and Design cities Criteria ET-MOWIE-77886-CS-QCBS / Component 2: Sanitation and Consultancy Service for water supply services Quality And Cost- Under 2019-09- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-06- 2019-09- preparation of Business plan IDA / 60070 Post Open - National 50,000.00 0.00 2018-11-20 improvement in secondary Based Selection Implementation 04 11 24 21 23 27 01 29 for Dire Dewa town by cities Diredewa town water utility ET-MOWIE-75898-CS-QCBS / Selection and Employment of Consultant for Development of Billing and Accounting System, Customer Care, FM Component 3: Project Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- improvement, network IDA / 60070 management & institutional Post Open - National 51,000.00 0.00 Canceled 2018-11-15 Based Selection 06 19 16 18 22 27 23 management and and capacity strengthening Building for Deghabur and Jigjiga towns by Somali Region Water Resource Development Bureau ET-MOWIE-75900-CS-QCBS / Selection and Employment of Consultant for Development of Billing and Accounting Component 3: Project System, Customer Care, FM Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- IDA / 60070 management & institutional Post Open - National 51,000.00 0.00 Canceled 2018-11-15 improvement, network Based Selection 06 19 16 18 22 27 23 strengthening management and and capacity Building for Adegrat and Mekelle towns by Tigray Region Water Bureau ET-MOWIE-75896-CS-QCBS / Selection and Employment of Consultant for Development of Billing and Accounting Component 3: Project System, Customer Care, FM Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- IDA / 60070 management & institutional Post Open - National 76,000.00 0.00 Canceled 2018-11-15 improvement, network Based Selection 06 19 16 18 22 27 23 strengthening management and and capacity Building for Bahirdar, Gonder, Debrebrihan and Dessie towns by Amahara Water Bureau ET-MOWIE-75897-CS-QCBS / Selection and Employment of Consultant for Development of Billing and Accounting Component 3: Project System, Customer Care, FM Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- IDA / 60070 management & institutional Post Open - National 76,000.00 0.00 Canceled 2018-11-15 improvement, network Based Selection 06 19 16 18 22 27 23 strengthening management and and capacity Building for Gambella, Semera, and Asosa towns by MoWIE ET-MOWIE-75892-CS-QCBS / Selection and Employment of Consultant for Development of Billing and Accounting Component 3: Project System, Customer Care, FM Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- IDA / 60070 management & institutional Post Open - National 76,000.00 0.00 Canceled 2018-11-15 improvement, network Based Selection 06 19 16 18 22 27 23 strengthening management and and capacity Building for Nekemte and Jimma towns by by Oromia WMEB ET-MOWIE-75903-CS-QCBS / Selection and Employment of Consultant for Development of Billing and Accounting Component 3: Project System, Customer Care, FM Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- IDA / 60070 management & institutional Post Open - National 76,000.00 0.00 Canceled 2018-11-14 improvement, network Based Selection 05 18 15 17 21 26 22 strengthening management and and capacity Building for Hawassa, Sodo, and Arbaminch towns by SNRPR Water Bureau ET-MOWIE-75888-CS-INDV / Selection and Employment of Consultant for Development of Billing and Accounting Component 3: Project System, Customer Care, FM Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- IDA / 60070 management & institutional Post Open - National 76,000.00 0.00 Canceled 2018-11-15 improvement, network Based Selection 06 19 16 18 22 27 23 strengthening management and Capacity Building for Adama, Assela, Bishoftu and Shashamene towns by Oromia WMEB ET-MOWIE-75899-CS-QCBS / Selection and Employment of Consultant for Development of Billing and Accounting Component 3: Project Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-08- System, Customer Care, FM IDA / 60070 management & institutional Post Open - National 75,000.00 0.00 Canceled 2018-11-15 Based Selection 06 19 16 18 22 27 25 improvement, network strengthening management and and capacity Building for Harar town by by Harar WMEB ET-MOWIE-75905-CS-QCBS / Selection and Employment of Consultant for Development of Billing and Accounting Component 3: Project Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-08- System, Customer Care, FM IDA / 60070 management & institutional Post Open - National 100,000.00 0.00 Canceled 2018-11-15 Based Selection 06 19 16 18 22 27 25 improvement, network strengthening management and and capacity Building for Diredewa town WSSS by diredewa town WSSS ET-MOWIE-107046-CS-QCBS / Consultancy Service for Design and Implementation of Component 2: Sanitation and an Integrated Management water supply services Quality And Cost- Open - Under 2019-09- 2019-09- 2019-11- 2019-10- 2020-05- 2019-12- 2020-06- 2020-01- 2020-11- 2020-02- 2020-03- 2021-09- IDA / 60070 Prior 4,067,243.00 0.00 2019-08-20 Information System for Urban improvement in secondary Based Selection International Implementation 16 10 07 24 07 05 26 04 17 08 14 05 Water Utilities in Ethiopia, by cities Water Development Commission ET-MOWIE-139130-CS-QCBS / consultancy service on the construction supervision of Component 2: Sanitation and FSM (fecal sludge water supply services Quality And Cost- Open - Under 2020-06- 2019-12- 2020-07- 2020-01- 2021-04- 2020-02- 2020-03- 2020-04- 2020-06- 2022-01- IDA / 60070 Prior 1,400,000.00 0.00 2019-11-21 management ) for Adama, improvement in secondary Based Selection International Implementation 12 12 14 25 27 24 25 29 03 24 Bahirdar, Hawasa, DireDewa, cities and Mekele Towns by Water Development Comision. ET-MOWIE-143194-CS-QCBS / Selection and Employment of Independent procurement Audit service for multi years Component 2: Sanitation and procurement Audit (2009- water supply services Quality And Cost- 2020-01- 2020-01- 2020-01- 2020-03- 2020-05- 2020-04- 2020-07- 2020-05- 2020-11- 2020-06- 2021-04- 2020-07- 2021-06- 2022-02- IDA / 60070 Prior Open - National 300,000.00 243,328.50 Signed 2019-12-25 2013 EFY) for 23 towns o f improvement in secondary Based Selection 01 08 27 08 12 07 14 07 09 11 21 16 04 06 Urban Water and Sanitation cities Project II (UWSSP-2) by Water Development Commission Page 9 ET-MOWIE-152576-CS-QCBS / Consultancy service for preparation of business plan and NRW Reduction strategic Component 2: Sanitation and plan and implement for water supply services Quality And Cost- Open - Under 2020-03- 2020-02- 2020-06- 2020-03- 2020-04- 2020-05- 2020-06- 2020-08- 2022-01- IDA / 60070 Prior 3,105,582.00 0.00 2020-01-23 Adama, Asela, Shashamene, improvement in secondary Based Selection International Implementation 13 13 08 28 25 25 29 03 25 Nekemete, Jima and Bishoftu cities towns Water supply and Sewerage authorities by Oromia Region Water Bureau ET-MOWIE-152577-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strategic water supply services Quality And Cost- Open - Under 2020-03- 2020-02- 2020-05- 2020-03- 2020-04- 2020-05- 2020-06- 2020-08- 2021-11- plan and implement for Bhir IDA / 60070 Prior 2,552,791.00 0.00 2020-01-23 improvement in secondary Based Selection International Implementation 13 13 28 28 25 25 29 03 26 Dar, Gonder, Dessie and cities Debre-birhan towns Water supply and Sewerage authorities by Amhara Region Water Bureau ET-MOWIE-152580-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strategic water supply services Quality And Cost- Open - Under 2021-02- 2020-02- 2021-04- 2020-03- 2020-04- 2020-05- 2020-06- 2020-08- 2021-09- plan and implement for IDA / 60070 Prior 2,258,370.00 0.00 2020-01-23 improvement in secondary Based Selection International Implementation 26 13 07 28 25 25 29 03 27 Gambella, Semera and Asosa cities towns Water supply and Sewerage authorities by Water Development Commission ET-MOWIE-77756-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strategic water supply services Quality And Cost- 2019-09- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-09- plan and implementation for IDA / 60070 Post Open - National 110,000.00 0.00 Canceled 2018-11-15 improvement in secondary Based Selection 04 06 19 16 18 22 27 24 JIjiga and Deghabur towns cities Water supply and Sewerage authorities by Somali Region Water Bureau ET-MOWIE-77754-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strategic water supply services Quality And Cost- 2019-09- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-09- plan and implement for IDA / 60070 Post Open - National 130,000.00 0.00 Canceled 2018-11-14 improvement in secondary Based Selection 04 05 18 15 17 21 26 23 A/Minch, Sodo and Hawassa cities towns Water supply and Sewerage authorities by SNNPR Region Water Bureau ET-MOWIE-75930-CS-QCBS / Selection and employment of consultant for Consultancy Component 2: Sanitation and service for preparation of water supply services Quality And Cost- 2019-09- 2018-12- 2019-02- 2019-03- 2019-04- 2019-05- 2019-06- 2019-10- business plan and NRW IDA / 60070 Post Open - National 110,000.00 0.00 Canceled 2018-11-30 improvement in secondary Based Selection 04 21 03 03 02 07 11 09 Reduction strategic plan and cities implementation mechanisms Mekele and Adigrat towns by Tigray regional water bureau ET-MOWIE-77755-CS-QCBS / Consultancy service service for preparation of business plan and NRW Reduction Component 2: Sanitation and strategic plan and water supply services Quality And Cost- 2019-09- 2018-12- 2019-02- 2019-03- 2019-04- 2019-05- 2019-06- 2019-10- implementation m for IDA / 60070 Post Open - National 130,000.00 0.00 Canceled 2018-11-29 improvement in secondary Based Selection 04 20 02 02 01 06 10 08 Gambella, Semera and Asosa cities towns Water supply and Sewerage authorities by Ministry of Water Irrigation and Electricity ET-MOWIE-107044-CS-QCBS / Selection and employment of consultant for Consultancy service for preparation of Component 2: Sanitation and business plan and NRW water supply services Quality And Cost- 2019-09- 2019-05- 2019-06- 2019-07- 2019-08- 2019-09- 2019-10- 2020-04- Reduction strategic plan and IDA / 60070 Post Open - National 200,000.00 0.00 Canceled 2019-04-10 improvement in secondary Based Selection 04 01 14 12 11 15 20 17 implementation mechanisms cities for Adama, Asella, Shashamene, Nekemte, Jimma and Bishoftu towns by Oromia WMEB ET-MOWIE-75921-CS-QCBS / Selection and employment of consultant for Consultancy service for preparation of Component 2: Sanitation and business plan and NRW water supply services Quality And Cost- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-06- 2019-11- IDA / 60070 Post Open - National 150,000.00 0.00 Canceled 2018-11-22 Reduction strategic plan and improvement in secondary Based Selection 13 26 23 25 29 03 30 implementation mechanisms cities for for Adama, Asella, Shashamene and Bishoftu towns by Oromia WMEB ET-MOWIE-77757-CS-QCBS / Consultancy service for preparation of business plan and NRW Reduction strategic Component 2: Sanitation and plan and implementation water supply services Quality And Cost- 2019-09- 2018-12- 2019-02- 2019-03- 2019-04- 2019-05- 2019-06- 2019-10- IDA / 60070 Post Open - National 60,000.00 0.00 Canceled 2018-11-30 mechanisms for Harar town improvement in secondary Based Selection 04 21 03 03 02 07 11 09 Water supply and Sewerage cities authorities by Harar town Water supply and Sewerage authorities ET-MOWIE-75919-CS-QCBS / Selection and employment of consultant for Consultancy service for preparation of Component 3: Project Quality And Cost- 2018-12- 2019-02- 2019-03- 2019-04- 2019-05- 2019-06- 2019-12- business plan and NRW IDA / 60070 management & institutional Post Open - National 110,000.00 0.00 Canceled 2018-11-30 Based Selection 21 03 03 02 07 11 08 Reduction strategic plan and strengthening implementation mechanisms for Jimma and Nekemte towns by Oromia WMEB ET-MOWIE-77761-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strafor water supply services Quality And Cost- 2019-09- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-09- Gonder, Dessie, Debreberhan IDA / 60070 Post Open - National 150,000.00 0.00 Canceled 2018-11-15 improvement in secondary Based Selection 04 06 19 16 18 22 27 24 and Bahirdar towns Water cities supply and Sewerage authorities by Amhara Region Water Bureau ET-MOWIE-152586-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strategic water supply services Quality And Cost- Open - Under 2020-07- 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2020-08- 2021-08- plan and implement for Jigjiga IDA / 60070 Post 1,505,580.00 0.00 2020-02-19 improvement in secondary Based Selection International Implementation 13 11 24 22 21 26 30 30 and Degnabur towns Water cities supply and Sewerage authorities by somali Region Water Bureau ET-MOWIE-152559-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strategic water supply services Quality And Cost- Open - Under 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2020-08- 2021-10- plan and implement for IDA / 60070 Post 1,700,000.00 0.00 2020-02-20 improvement in secondary Based Selection International Implementation 16 12 25 23 22 27 31 25 A/Minch, Sodo and Hawassa cities towns Water supply and Sewerage authorities by SNNPR Region Water Bureau ET-MOWIE-152583-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strategic water supply services Quality And Cost- Open - Under 2020-07- 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2020-08- 2021-08- plan and implement for IDA / 60070 Post 1,500,000.00 0.00 2020-02-20 improvement in secondary Based Selection International Implementation 13 12 25 23 22 27 31 31 Adegrat and Mekelle towns cities Water supply and Sewerage authorities by Tigray Region Water Bureau ET-MOWIE-152591-CS-QCBS / Consultancy service for preparation of business plan Component 2: Sanitation and and NRW Reduction strategic water supply services Quality And Cost- Open - Under 2020-04- 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2020-08- 2021-08- IDA / 60070 Post 1,500,000.00 0.00 2020-02-20 plan and implement for Harar improvement in secondary Based Selection International Implementation 15 12 25 23 22 27 31 31 town Water supply and cities Sewerage authority by Harar Region Water Bureau ET-MOWIE-146021-CS-QBS / Selection and Employment of Component 2: Sanitation and Consultant Environmental & Social Impact water supply services 2020-02- 2020-03- 2020-04- 2020-05- 2020-11- IDA / 60070 Post Qualification Open - National 29,100.00 0.00 Canceled 2020-01-14 Assessment for Arba Minch & improvement in secondary 04 19 18 23 19 Selection Wolaita Sodoby water cities Development commission Page 10 ET-MOWIE-146020-CS-QBS / Selection and Employment of Component 2: Sanitation and Environmental & Social Impact Consultant water supply services Under 2020-04- 2020-03- 2020-05- 2020-06- 2020-07- 2020-12- Assessment for Gondar, IDA / 60070 Post Qualification Open - National 60,000.00 0.00 2020-02-28 improvement in secondary Implementation 03 13 02 01 06 03 Dessie, Debre Berhan, Jigjiga Selection cities and Degehabur by water Development commission. ET-MOWIE-146016-CS-QBS / Selection and Employment of Environmental & Social Impact Component 2: Sanitation and Consultant Assessment for Jimma, water supply services Under 2020-04- 2020-03- 2020-05- 2020-06- 2020-07- 2020-12- IDA / 60070 Post Qualification Open - National 91,300.00 0.00 2020-02-28 Nekemte, Bishoftu, improvement in secondary Implementation 03 13 02 01 06 03 Selection Shashemene, Assela, W/Sodo cities and Arba Minch by water Development commission ET-MOWIE-146024-CS-QBS / Selection and Employment of Component 2: Sanitation and Environmental & Social Impact Consultant water supply services Under 2020-04- 2020-03- 2020-05- 2020-06- 2020-07- 2020-12- Assessment for Harar, IDA / 60070 Post Qualification Open - National 52,200.00 0.00 2020-02-28 improvement in secondary Implementation 03 13 02 01 06 03 Adigrat, Gambella, Semera- Selection cities Logia and, Assosa by water Development commission ET-MOWIE-205117-CS-QCBS / Consultancy Service for Component 2: Sanitation and Preparing Technical Design water supply services Quality And Cost- Open - Under 2020-12- 2021-01- 2021-02- 2021-03- 2021-05- 2021-06- 2022-11- IDA / 60080 Prior 1,700,000.00 0.00 2020-11-25 Manual, Operation, improvement in secondary Based Selection International Implementation 16 29 26 28 02 06 28 Maintenance and Management cities for Urban Sanitation by WDC INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOWIE-55842-CS-INDV / Selection and Employment of Component 3: Project Individual Pending 2018-07- 2018-08- 2018-09- 2024-08- Procurement Specialist for IDA / 60070 management & institutional Post Consultant Open 54,000.00 0.00 2018-06-18 Implementation 22 12 16 15 Mekelle Town Water Utility by strengthening Selection Mekelle Town Utility ET-MOWIE-63893-CS-INDV / Selection and Employment of Component 3: Project Individual Financial specialist for Adama 2020-06- 2018-07- 2018-07- 2018-07- 2019-07- 2018-08- 2018-07- 2019-08- IDA / 60080 management & institutional Post Consultant Open 5,185.00 3,908.81 Signed 2018-06-14 Town Waste Water 16 13 26 27 27 31 27 26 strengthening Selection Management project by Adama Town Utility office. ET-MOWIE-70084-CS-INDV / Selection and employment of Component 3: Project Individual 2018-12- 2018-09- 2019-03- 2018-09- 2019-03- 2018-10- 2019-03- 2019-10- Technical specialist for IDA / 60070 management & institutional Post Consultant Open 7,500.00 6,474.26 Signed 2018-08-07 02 05 07 15 10 13 10 13 Amhara regional bureau by strengthening Selection Amhara regional bureau ET-MOWIE-70090-CS-INDV / Selection and Employment of Component 3: Project Individual Technical specialist for Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 7,500.00 0.00 2018-08-07 Oromia Region Water Mineral Implementation 05 15 13 13 strengthening Selection and Energy Bureau by Oromia OWMEB ET-MOWIE-70097-CS-INDV / selection and employment of Component 3: Project Individual 2018-12- 2018-09- 2019-02- 2018-09- 2019-03- 2018-10- 2019-03- 2019-10- Technical specialist for IDA / 60070 management & institutional Post Consultant Open 7,500.00 6,470.41 Signed 2018-08-07 03 05 20 12 10 10 10 10 Amhara regional bureau by strengthening Selection Amhara regional bureau ET-MOWIE-70098-CS-INDV / Selection and Employment of Component 3: Project Individual Technical specialist for Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 7,500.00 0.00 2018-08-07 Oromia Region Water Mineral Implementation 05 26 24 24 strengthening Selection and Energy Bureau by Oromia OWMEB ET-MOWIE-70101-CS-INDV / Selection and Employment of Component 3: Project Individual Technical specialist for SNNPR 2019-02- 2018-09- 2020-04- 2018-09- 2019-04- 2018-10- 2019-04- 2019-10- IDA / 60070 management & institutional Post Consultant Open 7,500.00 5,366.75 Signed 2018-08-07 Region Water Resource 18 05 11 26 15 24 15 24 strengthening Selection Development Bureau by SNNPR Water Resource Bureau ET-MOWIE-70102-CS-INDV / Selection and Employment of Component 3: Project Individual Technical specialist for SNNPR Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 7,500.00 0.00 2018-08-07 Region Water Mineral and Implementation 05 19 24 24 strengthening Selection Energy Bureau by SNNPR Water Resource Bureau ET-MOWIE-70104-CS-INDV / Selection and Employment of Technical specialist for Component 3: Project Individual Ethiopian Somali Region Water Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 7,500.00 0.00 2018-08-07 Resource Development Bureau Implementation 05 26 31 31 strengthening Selection by Ethiopian Somali Region Water Resource Development Bureau ET-MOWIE-70107-CS-INDV / Selection and Employment of Technical specialist for Component 3: Project Individual Pending 2018-09- 2018-09- 2018-10- 2019-10- Benishangulegumuz Region IDA / 60070 management & institutional Post Consultant Open 7,500.00 0.00 2018-08-07 Implementation 05 26 31 31 Water Mineral and Energy strengthening Selection Bureau by Benshangulgumuz Region Water Bureau ET-MOWIE-70109-CS-INDV / Selection and Employment of Project Coordinator for Adama Component 3: Project Individual 2018-12- 2018-09- 2018-12- 2018-09- 2018-08- 2018-11- 2018-08- 2019-11- Town Waste Water IDA / 60070 management & institutional Post Consultant Open 8,800.00 5,556.55 Signed 2018-08-08 07 06 28 27 28 01 28 01 Management Project by strengthening Selection Adama Town Water Supply and Sewerage Authority ET-MOWIE-70111-CS-INDV / Selection and employment of financial specialist for Mekele Component 3: Project Individual Pending 2018-09- 2018-09- 2018-10- 2019-10- Town Water supply and IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-08-08 Implementation 06 13 18 18 sewerage service by mekele strengthening Selection town water supply and sewerage Authority ET-MOWIE-70119-CS-INDV / Selection and Employment of Component 3: Project Individual 2018-11- 2018-09- 2019-03- 2018-09- 2019-03- 2018-11- 2019-03- 2019-11- Project coordinator for Hawasa IDA / 60070 management & institutional Post Consultant Open 8,800.00 5,364.91 Signed 2018-08-15 06 13 18 27 19 01 19 01 Town by Hawasa Town Water strengthening Selection Supply and Sewerage Service ET-MOWIE-70125-CS-INDV / Selection and employment of financial specialist for Hawasa Component 3: Project Individual Pending 2018-09- 2018-09- 2018-11- 2019-11- Town Water supply and IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-08-15 Implementation 13 27 01 01 sewerage service by Hawasa strengthening Selection town water supply and sewerage Authority ET-MOWIE-70129-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Asela 2018-07- 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 8,800.00 6,509.16 Signed 2018-08-06 town by Asela town Water 15 04 02 18 12 23 12 23 strengthening Selection Supply and Sewerage Authority ET-MOWIE-70150-CS-INDV / Selection and Employment of Project Coordinator for Component 3: Project Individual 2019-12- 2018-09- 2019-12- 2018-09- 2020-06- 2018-11- 2020-06- 2019-11- Shashamene town by IDA / 60070 management & institutional Post Consultant Open 8,800.00 6,514.68 Signed 2018-08-15 01 13 20 27 08 01 08 01 Shashamene town Water strengthening Selection Supply and Sewerage Authority ET-MOWIE-70157-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for 2018-06- 2018-09- 2018-08- 2018-09- 2018-08- 2018-10- 2018-08- 2019-10- IDA / 60070 management & institutional Post Consultant Open 8,800.00 7,801.64 Signed 2018-08-10 Nekemte town by Nekemte 17 08 03 22 03 27 03 27 strengthening Selection town Water Supply and Sewerage Authority Page 11 ET-MOWIE-70166-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for 2018-07- 2018-09- 2018-09- 2018-09- 2018-09- 2018-11- 2018-09- 2019-11- IDA / 60070 management & institutional Post Consultant Open 8,800.00 5,530.78 Signed 2018-08-15 Arbaminch town by 01 13 02 27 11 01 11 01 strengthening Selection Arbaminch town Water Supply and Sewerage Authority ET-MOWIE-70176-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-08-13 Gambella town by Gambella Implementation 11 25 30 30 strengthening Selection town Water Supply and Sewerage Autrity ET-MOWIE-70184-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Asosa Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-08-14 town by Asosa town Water Implementation 12 26 31 31 strengthening Selection Supply and Sewerage Authority ET-MOWIE-70191-CS-INDV / Selection and employment of Component 3: Project Individual Under 2018-12- 2018-09- 2019-12- 2018-09- 2020-01- 2018-10- 2019-10- project coordinator for Adigrat IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-08-07 Implementation 06 05 02 19 12 24 24 town by Adigrat town water strengthening Selection supply and sewerage service ET-MOWIE-70193-CS-INDV / Selection and Employment of Component 3: Project Individual Procurement Specialist for Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 7,921.00 0.00 2018-08-13 Asosa town by Asosa town Implementation 11 25 30 30 strengthening Selection Water Supply and Sewerage Authority ET-MOWIE-70194-CS-INDV / Selection and Employment of Component 3: Project Individual financial spcialist for Asosa Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-08-13 town by Asosa town Water Implementation 11 25 30 30 strengthening Selection Supply and Sewerage Authority ET-MOWIE-70198-CS-INDV / Selection and Employment of Component 3: Project Individual Procurement Specialist for Pending 2018-09- 2018-09- 2018-11- 2019-11- IDA / 60070 management & institutional Post Consultant Open 7,921.00 0.00 2018-08-15 Adigrat town by Adigerat town Implementation 13 27 01 01 strengthening Selection Water Supply and Sewerage Authority ET-MOWIE-70199-CS-INDV / Selection and Employment of Component 3: Project Individual Financial Specialist for Adigrat Under 2018-09- 2018-09- 2018-11- 2019-11- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-08-15 town by Adigerat town Water Implementation 13 27 01 01 strengthening Selection Supply and Sewerage Authority ET-MOWIE-70202-CS-INDV / Selection and Employment of Component 3: Project Individual financial Specialist for Jijiga Pending 2018-09- 2018-09- 2018-10- 2019-10- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-08-15 town by Jijiga town Water Implementation 13 20 18 18 strengthening Selection Supply and Sewerage Authority ET-MOWIE-75716-CS-INDV / Selection and Employmnt of Component 3: Project Individual Financial Specialist for 2019-01- 2018-11- 2019-02- 2018-11- 2019-02- 2018-12- 2019-02- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 4,713.49 Signed 2018-09-14 Bahirdar town Water Supply 10 02 12 23 12 28 16 28 strengthening Selection and Sewerage Authority by Bahirdar Town ET-MOWIE-75723-CS-INDV / Selection and Employment of Component 3: Project Individual Financial Specialist for Gonder 2018-05- 2018-11- 2018-05- 2018-11- 2018-05- 2018-12- 2019-05- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 4,884.75 Signed 2018-09-13 town Water Supply and 01 01 01 22 01 27 01 27 strengthening Selection Sewerage Authority by Gonder Town ET-MOWIE-75730-CS-INDV / Selection and Employment of Component 3: Project Individual Financial Specialist for Dessie 2018-09- 2018-11- 2019-04- 2018-11- 2019-04- 2018-12- 2019-04- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 4,716.23 Signed 2018-09-14 town Water Supply and 10 02 25 23 26 28 26 28 strengthening Selection Sewerage Authority by Dessie Town ET-MOWIE-75736-CS-INDV / Selection and Employmentasw2q of Component 3: Project Individual 2018-09- 2018-11- 2019-12- 2018-11- 2019-12- 2018-12- 2019-12- 2019-12- Financial Specialist for IDA / 60070 management & institutional Post Consultant Open 6,600.00 4,575.98 Signed 2018-09-14 12 02 18 23 18 28 18 28 Bishoftu town Water Supply strengthening Selection and Sewerage Authority by Bishoftu Town ET-MOWIE-75738-CS-INDV / Selection and Employment of Component 3: Project Individual Financial Specialist for Pending 2018-11- 2018-11- 2018-12- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-09-14 Gambella town Water Supply Implementation 02 23 28 28 strengthening Selection and Sewerage Authority by Gambella Town ET-MOWIE-75746-CS-INDV / Selection and Employment of Component 3: Project Individual Financial Specialist for Jima Pending 2018-11- 2018-11- 2018-12- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-09-14 town Water Supply and Implementation 02 23 28 28 strengthening Selection Sewerage Authority by Jima Town ET-MOWIE-75749-CS-INDV / Selection and Employment of Component 3: Project Individual Financial Specialist for Semera Pending 2018-11- 2018-11- 2018-12- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-09-14 town Water Supply and Implementation 02 23 28 28 strengthening Selection Sewerage Authority by Semera Town ET-MOWIE-75750-CS-INDV / Selection and Employment of Component 3: Project Individual Financial Specialist for Pending 2018-11- 2018-11- 2018-12- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-09-14 Deghabur town Water Supply Implementation 02 23 28 28 strengthening Selection and Sewerage Authority by Deghabur Town ET-MOWIE-75753-CS-INDV / Selection and Employmnt of Component 3: Project Individual Financial Specialist for Harar Pending 2018-11- 2018-11- 2018-12- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-09-14 town Water Supply and Implementation 02 23 28 28 strengthening Selection Sewerage Authority by Harar Town ET-MOWIE-75755-CS-INDV / Selection and Employmnt of Component 3: Project Individual Financial Specialist for Pending 2018-11- 2018-11- 2018-12- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-09-14 Diredewa town Water Supply Implementation 02 23 28 28 strengthening Selection and Sewerage Authority by Diredewa Town ET-MOWIE-75757-CS-INDV / Selection and Employment of Component 3: Project Individual Financial Specialist for Sodo 2018-07- 2018-11- 2019-01- 2018-11- 2019-02- 2018-12- 2019-02- 2019-12- IDA / 60070 management & institutional Post Consultant Open 6,600.00 4,716.23 Signed 2018-09-14 town Water Supply and 03 02 17 23 15 28 15 28 strengthening Selection Sewerage Authority by Sodo Town ET-MOWIE-75758-CS-INDV / Selection and Employment of Financial Specialist for Component 3: Project Individual 2018-06- 2018-11- 2018-08- 2018-11- 2018-10- 2018-12- 2018-11- 2019-12- Debreberhan town Water IDA / 60070 management & institutional Post Consultant Open 6,600.00 4,735.33 Signed 2018-09-14 01 02 01 23 29 28 29 28 Supply and Sewerage strengthening Selection Authority by Debreberhan Town ET-MOWIE-75810-CS-INDV / Selection and Employment of Component 3: Project Individual 2018-06- 2018-10- 2019-02- 2018-11- 2019-02- 2018-12- 2019-02- 2019-12- Project Coordinator for IDA / 60070 management & institutional Post Consultant Open 8,800.00 5,536.05 Signed 2018-09-12 01 31 18 21 16 26 16 26 Bahirdar Town Water Supply strengthening Selection Project by Bahirdar Town ET-MOWIE-75811-CS-INDV / Selection and Employment of Component 3: Project Individual 2018-05- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-11- 2019-12- Project Coordinator for IDA / 60070 management & institutional Post Consultant Open 8,800.00 5,698.88 Signed 2018-09-12 01 31 30 21 01 26 01 26 Gonder Town Water Supply strengthening Selection Project by Gonder Town ET-MOWIE-75866-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Dessie Pending 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-10-15 Town Water Supply and Implementation 03 24 28 28 strengthening Selection Sewerage Enterprise by Dessie Town Page 12 ET-MOWIE-75871-CS-INDV / Selection and Employment of Project Coordinator for Component 3: Project Individual 2018-06- 2018-12- 2018-10- 2018-12- 2019-11- 2019-01- 2018-11- 2019-07- Debrebirhan Town Water IDA / 60070 management & institutional Post Consultant Open 8,800.00 5,550.54 Signed 2018-10-15 28 03 08 24 25 28 25 27 Supply and Sewerage strengthening Selection Enterprise by Debrabrihan Town ET-MOWIE-75872-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for 2019-12- 2018-12- 2019-12- 2018-12- 2019-12- 2019-01- 2019-12- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 6,537.11 Signed 2018-10-15 Bishoftu Town Water Supply 19 03 10 24 18 28 18 28 strengthening Selection and Sewerage Enterprise by Bishoftu Town ET-MOWIE-75873-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Jimma Pending 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-10-15 Town Water Supply and Implementation 03 24 28 28 strengthening Selection Sewerage Enterprise by Jimma Town ET-MOWIE-75874-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Pending 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-10-15 Semera Town Water Supply Implementation 03 24 28 28 strengthening Selection and Sewerage Enterprise by Semera Town ET-MOWIE-75875-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Harar Pending 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-10-15 Town Water Supply and Implementation 03 24 28 28 strengthening Selection Sewerage Enterprise by Harar Town ET-MOWIE-75876-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Pending 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-10-15 Diredewa Town Water Supply Implementation 03 24 28 28 strengthening Selection and Sewerage Enterprise by Diredewa Town ET-MOWIE-75877-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Pending 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-10-15 Mekelle Town Water Supply Implementation 03 24 28 28 strengthening Selection and Sewerage Enterprise by Mekelle Town ET-MOWIE-75880-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Jigjiga Pending 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-10-15 Town Water Supply and Implementation 03 24 28 28 strengthening Selection Sewerage Enterprise by Jigijiga Town ET-MOWIE-75881-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for Pending 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 0.00 2018-10-15 DeghaburTown Water Supply Implementation 03 24 28 28 strengthening Selection and Sewerage Enterprise by DeghaburTown ET-MOWIE-75882-CS-INDV / Selection and Employment of Component 3: Project Individual Under 2018-07- 2018-12- 2018-12- 2019-01- 2020-01- Technical Specialist for MOWIE IDA / 60070 management & institutional Post Consultant Open 7,500.00 0.00 2018-10-15 Implementation 01 03 24 28 28 Program management unit by strengthening Selection MoWIE ET-MOWIE-75883-CS-INDV / Component 3: Project Individual Selection and Employment of Under 2018-12- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Prior Consultant Open 7,500.00 0.00 2018-10-15 Procurement Specialist for Implementation 03 24 28 28 strengthening Selection MoWIE PMU by MoWIE ET-MOWIE-77731-CS-INDV / Selection and Employment of Component 3: Project Individual Project Coordinator for 2018-06- 2018-11- 2018-09- 2018-12- 2020-01- 2019-01- 2020-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 8,800.00 5,204.12 Signed 2018-09-26 SodoTown Water Supply and 11 14 30 05 20 09 20 09 strengthening Selection Sewerage Enterprise by Sodo Town ET-MOWIE-77735-CS-INDV / Selection and employment of Component 3: Project Individual 2018-07- 2018-11- 2018-07- 2018-12- 2018-09- 2019-01- 2018-09- 2020-01- financial specialist for IDA / 60070 management & institutional Post Consultant Open 6,600.00 4,880.10 Signed 2018-09-26 02 14 25 05 11 09 11 09 Arbaminch town WSSE for strengthening Selection Arbaminch Town ET-MOWIE-77736-CS-INDV / Selection and Employment of Component 3: Project Individual Financial specialist for 2018-08- 2018-11- 2018-07- 2018-12- 2018-08- 2019-01- 2018-08- 2020-01- IDA / 60070 management & institutional Post Consultant Open 6,600.00 2,676.54 Signed 2018-09-26 Nekemte Town Water Supply 16 14 03 05 01 09 01 09 strengthening Selection and Sewerage Enterprise by Nekemte Town ET-MOWIE-77737-CS-INDV / Selection and Employment of Component 3: Project Individual Financial specialist for Asella Pending 2018-11- 2018-12- 2019-01- 2020-01- IDA / 60070 management & institutional Post Consultant Open 6,600.00 0.00 2018-09-26 Town Water Supply and Implementation 14 05 09 04 strengthening Selection Sewerage Enterprise by Asella Town ET-MOWIE-77738-CS-INDV / Selection and Employment of Financial specialist for Component 3: Project Individual 2019-05- 2018-11- 2018-09- 2018-12- 2018-07- 2019-01- 2018-09- 2020-01- Shashamene Town Water IDA / 60070 management & institutional Post Consultant Open 6,600.00 3,922.27 Signed 2018-09-26 11 14 09 05 11 09 17 09 Supply and Sewerage strengthening Selection Enterprise by Shashamene Town ET-MOWIE-77734-CS-CDS / Selection and employment of Component 2: Sanitation and consultant for construction water supply services Under 2018-09- 2018-12- 2019-02- 2019-08- supervision and contract IDA / 60070 Post Direct Selection Direct 110,011.00 0.00 2018-11-30 improvement in secondary Implementation 12 10 13 12 administration for Dire Dewa cities Town WSSE by Dire Dewa Town ET-MOWIE-107048-CS-INDV / Selection and Employment of Component 3: Project Individual Under 2019-05- 2019-05- 2020-02- 2019-05- 2020-05- 2019-06- 2023-06- Individual Procurement IDA / 60070 management & institutional Prior Consultant Open 100,000.00 0.00 2019-04-01 Implementation 09 05 27 26 06 30 29 Consultant/Specialist by Water strengthening Selection Development Commission ET-MOWIE-107059-CS-INDV / Selection and Employment of Component 3: Project Individual Individual Technical Pending 2019-05- 2019-05- 2019-06- 2023-04- IDA / 60070 management & institutional Post Consultant Open 100,000.00 0.00 2019-04-01 Consultant/ Specialist by Implementation 04 18 22 27 strengthening Selection Water Development Commission ET-MOWIE-107052-CS-INDV / Selection and Employment of Contract Management Component 3: Project Individual 2019-04- 2019-05- 2019-08- 2019-05- 2019-11- 2019-06- 2019-11- 2023-07- Specialist for Water IDA / 60070 management & institutional Post Consultant Open 100,000.00 22,948.29 Signed 2019-04-01 30 04 30 25 05 29 13 08 Development commission strengthening Selection Urban WSSP II by Water Development Commission ET-MOWIE-107049-CS-INDV / Selection and Employment of Individual Financial Component 3: Project Individual 2019-04- 2019-05- 2019-10- 2019-05- 2019-11- 2019-06- 2019-11- 2023-07- Management Consultant/ IDA / 60070 management & institutional Post Consultant Open 100,000.00 24,407.63 Signed 2019-04-01 30 04 11 25 05 29 14 08 Specialist for Urban WSSP II by strengthening Selection Water Development Commission ET-MOWIE-110854-CS-INDV Component 3: Project Individual Under 2019-06- 2019-06- 2019-06- 2022-12- / Selection and Employment of IDA / 60070 management & institutional Post Consultant Open 50,000.00 0.00 2019-04-30 Implementation 02 09 30 28 Social Safeguard Senior strengthening Selection ET-MOWIE-107057-CS-INDV / Selection and Employment of Environmental and Social Component 2: Sanitation and Individual Safeguard Specialist for review water supply services Pending 2019-07- 2019-08- 2019-09- 2019-11- IDA / 60070 Post Consultant Open 52,000.00 0.00 2019-06-20 of 3 towns ( Adama, Dire improvement in secondary Implementation 24 14 07 06 Selection Dewa, Mekele) feasibility study cities and detail design by Water Development Commission Page 13 ET-MOWIE-118398-CS-INDV / Selection and Employment of Environmental and Social Component 2: Sanitation and Individual Safeguard Specialist for review water supply services Pending 2019-08- 2019-08- 2019-10- 2019-12- IDA / 60070 Post Consultant Open 35,000.00 0.00 2019-06-20 of 2 towns ( Hawasa and improvement in secondary Implementation 08 29 03 02 Selection Bahirdar) feasibility study and cities detail design by Water Development Commission ET-MOWIE-143029-CS-INDV Component 3: Project Individual / Selection and employment of 2019-12- 2020-01- 2020-04- 2020-01- 2020-06- 2020-02- 2020-06- 2020-05- IDA / 60070 management & institutional Post Consultant Open 25,000.00 21,813.30 Signed 2019-11-15 Sociologist for WDC by Water 20 03 03 24 23 28 23 28 strengthening Selection Development Commission ET-MOWIE-143055-CS-INDV Component 2: Sanitation and / Selection and Employment of Individual water supply services 2018-07- 2020-01- 2019-02- 2020-02- 2019-02- 2020-03- 2019-01- 2021-03- sanitation and Hygiene IDA / 60070 Post Consultant Open 30,000.00 5,536.05 Signed 2019-11-28 improvement in secondary 25 16 28 06 22 12 28 12 specialist by water Selection cities Development Commission. ET-MOWIE-143022-CS-INDV / Selection and Employment of Component 3: Project Individual Under 2020-01- 2020-01- 2020-02- 2020-06- Water Supply and Sanitation IDA / 60070 management & institutional Prior Consultant Open 30,000.00 0.00 2019-11-15 Implementation 03 24 28 27 Regulatory Specialist for WDC strengthening Selection by World Bank country office ET-MOWIE-143032-CS-INDV / Selection and employment of Component 3: Project Individual 2019-04- 2020-01- 2020-04- 2020-01- 2020-06- 2020-02- 2020-06- 2020-07- Environmental specialist for IDA / 60070 management & institutional Post Consultant Open 35,000.00 20,755.86 Signed 2019-11-15 30 03 03 24 23 28 23 27 Water Development strengthening Selection Commission by WDC ET-MOWIE-143016-CS-INDV / Selection and employment of Component 3: Project Individual 2019-12- 2020-01- 2020-04- 2020-02- 2020-06- 2020-03- 2020-06- 2020-08- legal specialist for WDC by IDA / 60070 management & institutional Post Consultant Open 40,000.00 21,341.44 Signed 2019-11-28 19 16 03 06 23 12 23 09 Water Development strengthening Selection Commission ET-MOWIE-143025-CS-INDV / Selection and Employment of Component 3: Project Individual 2019-12- 2020-01- 2020-04- 2020-01- 2020-06- 2020-02- 2020-06- 2020-07- Technical Specialist for WDC IDA / 60070 management & institutional Post Consultant Open 35,000.00 31,319.66 Signed 2019-11-15 18 03 03 24 23 28 23 27 by Water Development strengthening Selection Commission ET-MOWIE-143026-CS-INDV Component 3: Project Individual / Selection and Employment of 2019-12- 2020-01- 2020-04- 2020-01- 2020-06- 2020-02- 2020-06- 2020-07- IDA / 60070 management & institutional Post Consultant Open 30,000.00 28,520.21 Signed 2019-11-15 Economist for WDC by Water 20 03 03 24 23 28 23 27 strengthening Selection Development Commission ET-MOWIE-143012-CS-INDV / Selection and Employment of Component 3: Project Individual 2019-12- 2020-01- 2020-04- 2020-01- 2020-06- 2020-03- 2020-06- 2020-09- Governance/Public Policy IDA / 60070 management & institutional Post Consultant Open 50,000.00 48,149.24 Signed 2019-11-22 20 10 03 31 23 06 23 02 Specialist for WDC by Water strengthening Selection Development Commission ET-MOWIE-145062-CS-QBS / Component 2: Sanitation and Selection and Employment of Individual water supply services Pending 2020-01- 2020-02- 2020-03- 2021-03- business management IDA / 60070 Post Consultant Open 30,000.00 0.00 2019-11-28 improvement in secondary Implementation 16 06 12 12 specialist by the Water Selection cities Development Commission ET-MOWIE-75885-CS-INDV / Component 3: Project Individual Selection and Employment of Under 2019-01- 2019-01- 2019-02- 2020-02- IDA / 60070 management & institutional Prior Consultant Open 7,500.00 0.00 2018-11-15 Procurement Specialist for Implementation 03 24 28 28 strengthening Selection MoWIE PMU by MoWIE ET-MOWIE-181047-CS-INDV / Selection and Employment of one Additional Individual Component 3: Project Individual Under 2020-10- 2020-08- 2020-09- 2020-10- 2021-10- Procurement Consultant for IDA / 60070 management & institutional Prior Consultant Open 30,000.00 0.00 2020-07-08 Implementation 28 26 16 21 21 Water Development strengthening Selection Commission implemented by WDC ET-MOWIE-189851-CS-INDV / Selection and Employment of Individual Consultant who Component 3: Project Individual Pending 2020-11- 2020-11- 2020-12- 2021-12- provide support in selection of IDA / 60070 management & institutional Post Consultant Open 75,000.00 0.00 2020-09-15 Implementation 03 24 29 29 contractor and contract strengthening Selection administration of 5 towns FSTP DBO contract. ET-MOWIE-227402-CS-INDV Component 2: Sanitation and Individual / Individual consultants for water supply services Under 2021-04- 2021-06- 2021-07- 2021-08- 2021-11- IDA / 60070 Post Consultant Open 14,034.00 0.00 2021-04-15 Resettlement Action Plan (RAP) improvement in secondary Implementation 22 13 04 08 06 Selection Preparation for Hawassa cities Page 14 PROCUREMENT PLAN (Textual Part) Project information: Jiangxi Integrated Rural And Urban Water Supply And Wastewater Management Project Project Implementation agency: Jiangxi Integrated Rural And Urban Water Supply And Wastewater Management Project Management Office Date of the Procurement Plan: Sept. 2019 Period covered by this Procurement Plan: 24 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. A. The Bank’s Standard Procurement Documents (SPDs): The Bank’s SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures (Tendering and Bidding Law of the Peoples’ Republic of China, i.e. TBL promulgated by its Order No. 21 dated August 30, 1999 and the Implementation Regulations of the TBL promulgated by its State Council Order No. 613 dated November 30, 2011 and any amendments thereof) may be used with the following conditions to meet the requirements for open competitive procurement of paragraph 5.4 of the Procurement Regulations: a) All procurement notices shall be published in a national newspaper of wide circulation, or on a widely- used website / electronic portal with free access. b) A minimum of twenty (20) business days shall be given to Bidders between the date of such advertisement (or the date of availability of procurement documents, whichever is later and the deadline for the submission of bids). The advertisement and procurement documents shall specify the deadline for the submission of bids. Potential Bidders shall be allowed to inspect and purchase procurement documents at any time prior to the deadline for the submission of bids. c) Any Bidder/Consultant should be eligible to participate in a procurement process and to be awarded a Bank-financed contract as defined in paragraphs 3.21, 3.22 and 3.23 of the Procurement Regulations. d) Bidders/Consultants shall be allowed to submit bids/proposals by mail or in person. Bidders/consultants shall not be mandatory required to be present at the bid/proposal opening session. e) Bidders should not be required to register as a condition for inspecting or purchasing procurement documents, submitting its bid or receiving contract award. A winner Bidder, shall be given reasonable opportunity of registering (if required) before contract signing without any let or hindrance. Bidding shall not be restricted to any class of contractors. f) The winning bidder shall not be required, as a condition of award, to reduce its bid price No contract negotiation shall be permitted unless agreed in the procurement plan. g) No bid may be rejected solely on the basis that the bid price exceeds any cost estimate. Rejection of all bids or re-bidding shall not be allowed solely because the number of bids is less than three (3). Rebidding shall not take place without any sound justification. h) The Bank’s procurement documents for approaching the national market or any procurement document acceptable to the Bank shall be used. All procurement documents must require that bidders/consultants present a signed acceptance at the time of bidding or submitting a proposal, to be incorporated in any resulting contract, confirming application of and compliance with the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i) The procurement documents shall disclose the newspaper and / or the electronic means in which the information on contract award shall be published. j) The contract award notification shall identify: (a) name and address of the Borrower’s Project Implementing Unit, (b) name and reference number of the contract being awarded and the selection method used (c) names of all Bidders/Consultants that submitted bids/proposals and their prices as read out at the bid opening meeting and as evaluated (d) names of all Bidders/ Consultants whose bids/proposals were rejected either as nonresponsive or as not meeting qualification criteria or were not evaluated, with the reasons therefor and (e) the name of the successful Bidder/Consultant, the final contract price, the contract duration and a summary of its scope. i) The Borrower shall implement an effective complaint mechanism allowing bidders or consultants to complain, and have their complaints handled and responded in a timely manner. Procurement documents should indicate the complaint mechanism procedure and provide the professional title and address of the officials to whom such protests should be sent. j) The Bank shall be allowed to review procurement documentation and activities related to the activities included in the procurement plan. C. Other national procurement arrangements: When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. D. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. E. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations is not applicable: F. Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations: Goods: Domestic Preference is applicable for those contracts identified in the Procurement Plan tables. Works: Domestic Preference is not applicable G. Other Relevant Procurement Information:. Please insert the Procurement Plan   PROCUREMENT PLAN FOR THE JIANGXI INTEGRATED RURAL AND URBAN WATER SUPPLY AND WASTEWATER MANAGEMENT PROJECT Date of procurement plan:   1 USD = 6.68 RMB               2019/ Estim Estima Estim Estim ated Origin Estimate Lo New Fundi ted ated Procur Evalu Bank ated Date al Contr Market d Date N ca Contr ng Contract Cost Cost ement ation Review Date of Contr act Metho of Remarks o. tio act Sourc Name (10,00 (10,0 Metho Stand (Prior/P of Bid Contr act Type d Advertis n No. e 0 00 d ard ost  Open act No. ement RMB  USD  ning Signi ng Purchasing Contract on Ductile Iron Pipe for Pipes for Water Supply raw water Infrastructur pipeline e Lump Open / project from D Construction Lowes SH- -sum Reque Domes Hengshan on SHST- World and t DX- Contr 1522.3 227.9 st for tic / 2019. 2019. reservoir- 1 gx WB- Bank Renovation Evalu Post 2019.6 GC- act / 7 0 Bid Post- 7 7 Chengdong ia 0049 Loan Project ated 01 Good (RFB  qualific waterworks ng (Water Cost s ation ,Hofang Intake Reservoir- Project) in Chengdong Dongxiang waterworks County loaned by the wold bank General Including Contract for the raw BoQ Construction water based of Water installation, Adme Open / D Supply Lowes intake asure Reque Domes on SH- SHST- World Infrastructur t pumping ment 1523.9 228.1 st for tic / 2019. 2019. 2 gx DX- WB- Bank e Evalu Post 2019.6 house and Contr 4 3 Bid Post- 7 7 ia SG-02 0050 Loan Construction ated integrated act / (RFB  qualific ng and Cost pumping Const ation Renovation station ructio Project works and n (Water equipment Intake installation. Project) in Dongxiang County loaned by the World Bank Purchasing Contract on Ductile Iron Pipe for Water Supply Infrastructur e Lump Open / Construction Lowes SH- -sum Reque Domes Le SHST- World and t LP- Contr 6457.6 966.7 st for tic / 2019. 2019. Raw water 3 pi WB- Bank Renovation Evalu Prior 2019.6 GC- act / 6 2 Bid Post- 7 7 installation ng 0051 Loan Project ated 01 Good (RFB  qualific (Water Cost s ation Intake Project) in Leping County, loaned by the wold bank General Contract for Construction Including of Water the raw BoQ Supply water based Infrastructur installation, Adme e Open / Lowes intake asure Construction Reque Domes Le SH- SHST- World t pumping ment and 8753.4 1310. st for tic / 2019. 2019. 4 pi LP- WB- Bank Evalu Prior 2019.6 house and Contr Renovation 3 39 Bid Post- 7 7 ng SG-01 0052 Loan ated integrated act / Project (RFB  qualific Cost pumping Const (Water ation station ructio Intake works and n Project) in equipment Leping installation. County loaned by the World Bank Purchasing Contract on Smart Water Meters for Leping Lump CouontyWate Open / Lowes -sum r Supply Reque Domes Le SH- SHST- World t Smart Contr Infrastructur 5005.8 749.3 st for tic / 2019. 2019. 5 pi LP- WB- Bank Evalu Prior 2019.6 Water act / e 0 7 Bid Post- 7 7 ng SB-01 0053 Loan ated Meters Good Construction (RFB  qualific Cost s and ation Renovation Project, loaned by the wold bank Purchasing Contract on Ductile Iron Pipe for Pipes Water Supply DN800 used Infrastructur from the e Lump Open / Emergency Construction Lowes Li SH- -sum Reque Domes water SHST- World and t nc LC- Contr st for tic / 2019. 2019. source 6 WB- Bank Renovation 444.48 66.54 Evalu Post 2019.6 hu GC- act / Bid Post- 7 7 intake 0054 Loan Project ated an 01 Good (RFB  qualific pumping (Water Cost s ation station to Intake Lingchuan Project) in NO.2 Linchuan waterworks County loaned by the wold bank . General Contract for Construction of Water Supply Including BoQ Infrastructur the based e installation Adme Construction Open / Lowes of raw Li asure and Reque Domes SH- SHST- World t water pipes nc ment Renovation 5113.0 765.4 st for tic / 2019. 2019. 7 LC- WB- Bank Evalu Post 2019.6 and the hu Contr Project 2 2 Bid Post- 7 7 SG-02 0055 Loan ated infrastructio an act / (Water (RFB  qualific Cost n Const Intake ation construction ructio Project and of new n Water Plant) waterworks in Linchuan County loaned by the world bank Purchasing Contract on Ductile Iron Pipe for Water Supply Infrastructur e Lump Open / Construction Lowes Xi SH- -sum Reque Domes SHST- World and t us XS- Contr 2801.7 419.4 st for tic / 2019. 2019. Raw water 8 WB- Bank Renovation Evalu Prior 2019.6 hu GC- act / 2 2 Bid Post- 7 7 pipeline 0056 Loan Project ated i 01 Good (RFB  qualific (Water Cost s ation Intake Project) in Xiushui County loaned by the wold bank General Including BoQ Contract for the raw based Construction water Adme Open / of Water Lowes installation, Xi asure Reque Domes SH- SHST- World Supply t intake us ment 4154.7 621.9 st for tic / 2019. 2019. 9 XS- WB- Bank Infrastructur Evalu Post 2019.6 pumping hu Contr 0 6 Bid Post- 7 7 SG-01 0057 Loan e ated house and i act / (RFB  qualific Construction Cost integrated Const ation and pumping ructio Renovation station n Project works and (Water equipment Intake installation. Project) in Xiushui County loaned by the World Bank Purchasing Contract on Smart Water Meters for Leping Lump CouontyWate Open / Lowes Xi -sum r Supply Reque Domes SH- SHST- World t Smart 1 us Contr Infrastructur 4326.0 647.6 st for tic / 2019. 2019. XS- WB- Bank Evalu Prior 2019.6 Water 0 hu act / e 0 0 Bid Post- 7 7 SB-01 0058 Loan ated Meters i Good Construction (RFB  qualific Cost s and ation Renovation Project, loaned by the wold bank General Contract on Including BoQ Pipeline general based Installation contracting Adme for Xiushui Open / Lowes for Pipeline asure County Reque Domes Zh SH- SHST- World t installation, 1 ment Zhajin 3126.4 468.0 st for tic / 2019. 2019. aji XSZJ- WB- Bank Evalu Post 2019.6 newly built 1 Contr Township 6 3 Bid Post- 7 7 n SG-02 0059 Loan ated inspection act / Wastewater (RFB  qualific Cost wells,house Const management ation hold ructio Project connection n loaned by project the world bank Purchasing Contract on Lump PE Pipes for Open / Lowes -sum Xiushui Reque Domes Zh SH- SHST- World t 1 Contr County 1072.5 160.5 st for tic / 2019. 2019. aji XSZJ- WB- Bank Evalu Post 2019.6 PE Pipes 2 act / Zhajin 1 6 Bid Post- 7 7 n PE-03 0060 Loan ated Good Township (RFB  qualific Cost s Wastewater ation management Project loaned by the world bank Purchasing Contract on Ductile Iron Pipe for Water Supply Infrastructur e Lump Open / Construction Lowes Yo SH- -sum Reque Domes Pipes for SHST- World and t 1 ng YX- Contr 4335.5 649.0 st for tic / 2019. 2019. water WB- Bank Renovation Evalu Prior 2019.6 3 xi GC- act / 8 4 Bid Post- 7 7 intake 0061 Loan Project ated n 01 Good (RFB  qualific projects (Water Cost s ation Intake Project) in Yongxin County loaned by the wold bank General Contract for Construction of Water Including Supply the raw BoQ Infrastructur water based e installation, Adme Open / Construction Lowes intake Yo asure Reque Domes SH- SHST- World and t pumping 1 ng ment 6163.7 922.7 st for tic / 2019. 2019. YX- WB- Bank Renovation Evalu Post 2019.6 house and 4 xi Contr 1 1 Bid Post- 7 7 SG-01 0062 Loan Project ated integrated n act / (RFB  qualific (Water Cost pumping Const ation Intake station ructio Project) in works and n Yongxin equipment County installation. loaned by the World Bank Purchasing Contract on Smart Water Meters for Yongxin Lump CouontyWate Open / Lowes Yo -sum r Supply Reque Domes SH- SHST- World t Smart 1 ng Contr Infrastructur st for tic / 2019. 2019. YX- WB- Bank 324.82 48.63 Evalu Post 2019.6 Water 5 xi act / e Bid Post- 7 7 SB-01 0063 Loan ated Meters n Good Construction (RFB  qualific Cost s and ation Renovation Project, loaned by the wold bank Purchasing contract WB Integrated Rural and Urban Water Lump all Supply and Reque Lowes -sum co SH- SHST- World Wastewater st for t 1 Contr Domes 2019. 2019. Office un BG- WB- Bank Management 92.40 13.83 Quota Evalu Post 2019.6 6 act / tic 7 7 Supplies tie 01 0064 Loan Project tion ated Good s Provision of (RFQ  Cost s Office Supplies for the Project Management Office Purchasing contract on Vehicle for Jiangxi Lump all Integrated Reque Lowes -sum co SH- SHST- World Rural and st for t 1 Contr Domes 2019. 2019. un BG- WB- Bank Urban Water 150.00 22.46 Quota Evalu Post 2019.6 Vehicle 7 act / tic 7 7 tie 01 0065 Loan Supply and tion ated Good s Wastewater (RFQ  Cost s Management Projec ,loane d by the world bank Purchasing Contract on Ductile Iron Lump Open / D Pipe for Lowes PT- -sum Reque Domes on SHST- World urban water t 1 DX- Contr 2233.0 314.5 st for tic / 2019.1 gx WB- Bank supply Evalu Post 2019.10 2019.11 8 GC- act / 0 1 Bid Post- 1 ia 0092 Loan network ated 01 Good (RFB  qualific ng reconstructio Cost s ation n in Dongxiang County Purchasing Contract on Lump Ductile Iron Open / Lowes PT- -sum Pipe for Reque Domes Le SHST- World t 1 LP- Contr urban water 129.5 st for tic / 2019.1 pi WB- Bank 919.98 Evalu Post 2019.10 2019.11 9 GC- act / supply 7 Bid Post- 1 ng 0093 Loan ated 03 Good network (RFB  qualific Cost s reconstructio ation n in Leping County Purchasing Contract on Lump Ductile Iron Open / Lowes Li PT- -sum Pipe for Reque Domes SHST- World t 2 nc LC- Contr urban water 1272.0 179.1 st for tic / 2019.1 WB- Bank Evalu Post 2019.10 2019.11 0 hu GC- act / supply 0 5 Bid Post- 1 0094 Loan ated an 02 Good network (RFB  qualific Cost s reconstructio ation n in Linchuan County Purchasing Contract on Lump Ductile Iron Open / Lowes Xi PT- -sum Pipe for Reque Domes SHST- World t 2 us XS- Contr urban water 3066.0 431.8 st for tic / 2019.1 WB- Bank Evalu Prior 2019.10 2019.11 1 hu GC- act / supply 0 3 Bid Post- 1 0095 Loan ated i 03 Good network (RFB  qualific Cost s reconstructio ation n in Xiushui County Purchasing Contract on Lump Ductile Iron Open / Lowes Yo PT- -sum Pipe for Reque Domes SHST- World t 2 ng YX- Contr urban water st for tic / 2019.1 WB- Bank 275.00 38.73 Evalu Post 2019.10 2019.11 2 xi GC- act / supply Bid Post- 1 0096 Loan ated n 02 Good network (RFB  qualific Cost s reconstructio ation n in Yongxin County PROCUREMENT China : Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2019-05-28 2021-05-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158760 GPN Date: 2018-04-24 Project Name: Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project Loan / Credit No: IBRD / 88490 J Executing Agency(ies): iangxi water WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SHST-WB-0050 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, by the World Bank—General Single Stage - One 2021-02- IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,281,300.00 0.00 Canceled 2019-06-03 2019-06-08 2019-07-08 2019-07-15 2019-08-19 Contract for Construction of Envelope 17 Supply System Raw Water Pipe Installation Project at ChengDong Water Treatment Plant in Dongxiang County SHST-WB-0055 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, by the World Bank—General Single Stage - One 6,107,417.3 2021-08- IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 7,654,200.00 Signed 2019-06-03 2019-11-14 2019-06-08 2019-11-14 2019-07-08 2019-12-12 2019-07-15 2019-12-31 2019-08-19 2020-03-26 Contract for Water Plant Envelope 3 18 Supply System Construction Project and Raw Water Pipe installation Project of Linchuan NO.2 Water Treatment Plant SHST-WB-0059 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned by the World Bank—General Demonstration of Rural Single Stage - One 3,768,384.5 2021-08- IBRD / 88490 Post Request for Bids Open - National 4,680,300.00 Signed 2019-06-03 2019-11-14 2019-06-08 2019-11-14 2019-07-08 2019-12-12 2019-07-15 2019-12-31 2019-08-19 2020-03-25 Contract on Pipeline Wastewater Management Envelope 3 18 Installation for Xiushui County Zhajin Township Wastewater management Project SHST-WB-0068 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One 2021-11- by the World Bank—General IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 8,439,500.00 0.00 Canceled 2019-08-25 2019-08-30 2019-09-29 2019-10-06 2019-11-10 Envelope 09 Contract for Construction of Supply System ChengDong Water Treatment Plant project in Dongxiang County SHST-WB-0070 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One 1,749,048.6 2021-11- by the World Bank—General IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,352,400.00 Signed 2019-08-25 2020-03-03 2019-08-30 2020-03-23 2019-09-29 2020-03-31 2019-10-09 2020-05-14 2019-11-13 2020-06-30 Envelope 3 12 Contract for Construction of Supply System rehabilitation and expansion project at RunQuan and LiLin Water Plant in Leping County SHST-WB-0072 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One 1,568,156.6 2021-05- by the World Bank—General IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,355,800.00 Signed 2019-08-25 2020-03-03 2019-08-30 2020-03-23 2019-09-29 2020-03-31 2019-10-09 2020-05-14 2019-11-13 2020-06-30 Envelope 3 14 Contract for rehabilitation Supply System and expansion Project of Xiushui No.3 Water Treatment Plant SHST-WB-0073 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One 13,262,600.0 9,211,763.2 2021-11- by the World Bank—General IBRD / 88490 and Modernization of Water Post Request for Bids Open - National Signed 2019-08-25 2020-03-03 2019-08-30 2020-03-23 2019-09-29 2020-03-31 2019-10-09 2020-05-14 2019-11-13 2020-07-02 Envelope 0 8 12 Contract for Construction of Supply System ChengNan water treatment plant project in Yongxin County SHST-WB-0052 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One 6,087,119.6 2021-02- by the World Bank—General IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 6,442,900.00 Signed 2019-06-03 2019-08-31 2019-06-08 2019-09-11 2019-07-08 2019-10-11 2019-07-15 2019-11-07 2019-08-19 2019-12-30 Envelope 6 16 Contract for Raw Water Pipe Supply System Installation Project of RunQuan Water Treatment Plant in Leping County SHST-WB-0057 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One 1,711,008.6 2021-02- by the World Bank—General IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 1,804,200.00 Signed 2019-06-03 2019-09-05 2019-06-08 2019-09-09 2019-07-08 2019-10-11 2019-07-15 2019-11-06 2019-08-19 2019-12-30 Envelope 4 17 Contract for Construction of Supply System Raw Water Pipe Installation Project at Xiushui NO.3 Water Treatment Plant Page 1 SHST-WB-0062 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One 3,250,711.9 2021-02- by the World Bank—General IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,429,300.00 Signed 2019-06-03 2019-09-05 2019-06-08 2019-09-09 2019-07-08 2019-10-11 2019-07-15 2019-11-06 2019-08-19 2019-12-16 Envelope 6 17 Contract for Raw Water Pipe Supply System Installation Project of ChengNan Water Treatment Plant in Yongxin County SHST-SH-0097 / General Contract for Construction of Expansion, Rehabilitation, ChengDong Water Treatment Single Stage - One 9,188,436.6 2022-01- IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 8,450,700.00 Signed 2019-10-30 2019-11-14 2019-11-04 2019-11-14 2019-12-04 2019-12-12 2019-12-19 2019-12-31 2020-01-23 2020-03-11 Plant project and Raw Water Envelope 5 22 Supply System Pipe Installation project in Dongxiang County SHST-WB-0127 / General Construction contract on installation of rural water Expansion, Rehabilitation, Single Stage - One 7,997,675.7 2021-09- distribution network and IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 8,028,200.00 Signed 2020-07-01 2020-08-11 2020-07-06 2020-08-11 2020-08-05 2020-09-10 2020-08-20 2020-10-11 2020-09-24 2020-12-08 Envelope 2 24 reconstruction of water supply Supply System network in some urban areas of Dongxiang District SHST-WB-0128 / General Construction Contract on rural water distribution network in Expansion, Rehabilitation, Jinxi County, water plant Single Stage - One 5,351,659.7 2021-09- IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 8,450,700.00 Signed 2020-07-01 2020-08-11 2020-07-06 2020-08-11 2020-08-05 2020-09-10 2020-08-20 2020-10-11 2020-09-24 2021-03-18 construction at Huangtong Envelope 0 24 Supply System Township and part of the urban water supply network reconstruction in Jinxi County SHST-WB-0130 / General Construction contract on installation of rural water Expansion, Rehabilitation, Single Stage - One 2,799,382.4 2021-09- distribution network and IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,413,700.00 Signed 2020-07-01 2020-08-11 2020-07-06 2020-08-11 2020-08-05 2020-09-10 2020-08-20 2020-10-20 2020-09-24 2021-01-05 Envelope 1 24 reconstruction of water supply Supply System network in some urban area of Linchuan County SHST-WB-0131 / General Construction contract on installation of rural water Expansion, Rehabilitation, Single Stage - One 14,084,500.0 2021-09- distribution network and IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 0.00 Canceled 2020-07-01 2020-07-30 2020-07-06 2020-08-09 2020-08-05 2020-09-10 2020-08-20 2020-11-19 2020-09-24 Envelope 0 24 reconstruction of water supply Supply System network in some urban areas of Xiushui County SHST-WB-0132 / General Construction contract on installation of rural water Expansion, Rehabilitation, Single Stage - One 6,608,050.5 2021-09- distribution network and IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 5,633,800.00 Signed 2020-07-01 2020-08-11 2020-07-06 2020-08-11 2020-08-05 2020-09-10 2020-08-20 2020-10-20 2020-09-24 2021-03-18 Envelope 3 24 reconstruction of water supply Supply System network in some urban areas of Yongxin County SHST-WB-0133 / General Construction contract on Expansion, Rehabilitation, Single Stage - One 3,087,172.1 2021-09- installation of rural water IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,943,700.00 Signed 2020-07-01 2020-08-11 2020-07-06 2020-08-11 2020-08-05 2020-09-10 2020-08-20 2020-10-20 2020-09-24 2020-12-10 Envelope 5 24 distribution network in Supply System Nanfeng County SHST-WB-0129 / General Construction contract on installation of rural water Expansion, Rehabilitation, Single Stage - One 8,879,969.1 2021-11- distribution network and IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 4,368,000.00 Signed 2020-07-19 2020-08-11 2020-07-24 2020-08-11 2020-09-04 2020-09-10 2020-10-04 2020-10-11 2020-11-08 2021-03-18 Envelope 5 08 reconstruction of water supply Supply System network in some urban areas of Leping county SHST-WB-0131-1 / General Construction contract on installation of rural water Expansion, Rehabilitation, Under Single Stage - One 20,704,200.0 2021-12- distribution network and IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 0.00 Implementat 2021-03-12 2021-03-23 2021-03-17 2021-04-02 2021-04-28 2021-05-07 2021-05-28 2021-06-15 2021-07-02 Envelope 0 29 reconstruction of water supply Supply System ion network in some urban areas of Xiushui County GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SHST-WB-0063 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One by the World IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 486,300.00 421,719.06 Signed 2019-06-03 2020-01-16 2019-06-08 2020-01-16 2019-07-08 2020-03-26 2019-07-15 2020-05-20 2019-08-19 2020-07-03 2020-08-18 Envelope Bank—Purchasing Contract on Supply System Smart Water Meters for urban water supply network reconstruction in Yongxin County SHST-WB-0058 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One by the World IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 6,476,000.00 3,393,075.78 Signed 2019-06-03 2020-01-11 2019-06-08 2020-01-16 2019-07-08 2020-03-26 2019-07-15 2020-05-19 2019-08-19 2020-06-23 2020-08-18 Envelope Bank—Purchasing Contract on Supply System Smart Water Meters for urban water supply network reconstruction in Xiushui County SHST-WB-0049 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, by the World Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,279,000.00 1,540,379.09 Signed 2019-06-03 2019-11-19 2019-06-08 2019-11-19 2019-07-08 2020-01-06 2019-07-15 2020-01-06 2019-08-19 2020-04-15 2020-08-18 Bank—Purchasing Contract on Envelope Supply System Ductile Iron Pipe for Raw Water Pipe Installation Project of ChengDong Water Treatment Plant in Dongxiang County Page 2 SHST-WB-0053 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One by the World IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 7,493,700.00 2,332,483.15 Signed 2019-06-03 2020-01-11 2019-06-08 2020-01-16 2019-07-08 2020-03-26 2019-07-15 2020-05-19 2019-08-19 2020-06-23 2020-08-18 Envelope Bank—Purchasing Contract on Supply System Smart Water Meters for urban water supply network reconstruction in Leping County SHST-WB-0060 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Demonstration of Rural Single Stage - One by the World IBRD / 88490 Post Request for Bids Open - National 1,605,600.00 1,357,501.00 Signed 2019-06-03 2019-11-19 2019-06-08 2019-11-19 2019-07-08 2019-12-17 2019-07-15 2020-01-10 2019-08-19 2020-03-20 2020-08-18 Wastewater Management Envelope Bank—Purchasing Contract on HDPE Pipes for Xiushui County Zhajin Township Wastewater management Project SHST-WB-0054 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, by the World Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 665,400.00 464,961.69 Signed 2019-06-03 2019-11-19 2019-06-08 2019-11-19 2019-07-08 2020-01-06 2019-07-15 2020-01-06 2019-08-19 2020-04-15 2020-08-18 Bank—Purchasing Contract on Envelope Supply System Ductile Iron Pipe for Raw Water Pipe Installation Project of Linchuan NO.2 Water Treatment Plant SHST-WB-0065 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Public Engagement and Request for Single Stage - One Management Project loaned IBRD / 88490 Post Limited 224,600.00 140,398.94 Signed 2019-06-08 2019-11-07 2019-07-28 2019-12-10 2020-01-24 Project Management Quotations Envelope by the World Bank—Purchasing contract on Vehicle for the Project SHST-WB-0064 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Public Engagement and Request for Single Stage - One IBRD / 88490 Post Limited 138,300.00 65,137.22 Signed 2019-06-08 2019-12-04 2019-07-28 2020-01-16 2020-01-24 by the World Project Management Quotations Envelope Bank—Purchasing contract on Provision of Office Supplies for the Project Management Office SHST-WB-0069 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Request for Single Stage - One by the World IBRD / 88490 and Modernization of Water Post Limited 373,100.00 0.00 Canceled 2019-08-30 2019-10-19 2020-04-16 Quotations Envelope Bank—Purchasing contract on Supply System Floating Pumping Station for Water Intake Project of Hengshan Reservoir in Dongxiang County SHST-WB-0071 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Pending by the World Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 625,300.00 0.00 Implementati 2019-08-25 2019-08-30 2019-09-29 2019-10-09 2019-11-13 2020-11-12 Bank—Purchasing contract on Envelope Supply System on Matching Equipment for Modernization and Reconstruction in Linchuan No.1 Water treatment plant SHST-WB-0074 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One by the World IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 1,197,600.00 722,749.67 Signed 2019-08-25 2019-10-15 2019-08-30 2019-10-14 2019-09-29 2019-11-21 2019-10-09 2019-12-24 2019-11-13 2020-03-16 2020-11-12 Envelope Bank—Purchasing contract on Supply System Valves for Raw Water Pipe Installation Project in Leping,Xiushui and Yongxin County SHST-WB-0051 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, by the World Single Stage - One IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 11,994,400.00 10,363,507.16 Signed 2019-06-03 2019-08-19 2019-06-08 2019-08-23 2019-07-08 2019-09-29 2019-07-15 2019-10-25 2019-08-19 2019-12-16 2020-08-18 Bank—Purchasing Contract on Envelope Supply System Ductile Iron Pipe for Raw Water Pipe Installation Project of RunQuan Water Treatment Plant in Leping County SHST-WB-0061 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, by the World Single Stage - One IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 7,682,400.00 6,718,546.18 Signed 2019-06-03 2019-08-19 2019-06-08 2019-08-28 2019-07-08 2019-09-29 2019-07-15 2019-10-25 2019-08-19 2019-12-16 2020-08-18 Bank—Purchasing Contract on Envelope Supply System Ductile Iron Pipe for Raw Water Pipe Installation Project of ChengNan Water Treatment Plant in Yongxin County SHST-WB-0056 / Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project loaned Expansion, Rehabilitation, Single Stage - One by the World IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,818,600.00 2,501,795.98 Signed 2019-06-03 2019-08-21 2019-06-08 2019-08-21 2019-07-08 2019-09-29 2019-07-15 2019-10-26 2019-08-19 2019-12-16 2020-08-18 Envelope Bank—Purchasing Contract on Supply System Ductile Iron Pipe for Raw Water Pipe Installation Project of Xiushui NO.3 Water Treatment Plant SHST-WB-0092 / Purchase Contract on ductile iron pipe for reconstruction of pipe Expansion, Rehabilitation, Single Stage - One network for urban water IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,686,000.00 3,654,811.89 Signed 2019-10-21 2019-11-19 2019-10-26 2019-11-19 2019-11-25 2020-01-06 2019-12-10 2020-01-06 2020-01-14 2020-04-15 2023-01-13 Envelope supply and extension of rural Supply System pipe network in Dongxiang county Page 3 SHST-WB-0093 / Purchase Contract on ductile iron pipe Expansion, Rehabilitation, for reconstruction of pipe Single Stage - One IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 5,614,100.00 3,884,383.04 Signed 2019-10-21 2019-11-15 2019-10-26 2019-11-20 2019-11-25 2020-01-06 2019-12-10 2020-03-24 2020-01-14 2020-04-29 2023-01-13 network for urban water Envelope Supply System supply and extension of rural pipe network in Leping County SHST-WB-0094 / Purchase Contract on ductile iron pipe for reconstruction of pipe Expansion, Rehabilitation, Single Stage - One network for urban water IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,806,500.00 2,803,583.14 Signed 2019-10-21 2019-11-19 2019-10-26 2019-11-19 2019-11-25 2020-01-06 2019-12-10 2020-01-06 2020-01-14 2020-04-15 2023-01-13 Envelope supply and extension of rural Supply System pipe network in Linchuan County SHST-WB-0095 / Purchase Contract on ductile iron pipe for reconstruction of pipe Expansion, Rehabilitation, Single Stage - One network for urban water IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 11,074,800.00 9,593,788.11 Signed 2019-10-21 2019-11-15 2019-10-26 2019-11-20 2019-11-25 2020-01-06 2019-12-10 2020-03-25 2020-01-14 2020-04-29 2023-01-13 Envelope supply and extension of rural Supply System pipe network in Xiushui County SHST-WB-0096 / Purchase Contract on ductile iron pipe for reconstruction of pipe Expansion, Rehabilitation, Single Stage - One network for urban water IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 4,111,200.00 4,215,409.66 Signed 2019-10-21 2019-11-15 2019-10-26 2019-11-20 2019-11-25 2020-01-06 2019-12-10 2020-03-24 2020-01-14 2020-04-29 2023-01-13 Envelope supply and extension of rural Supply System pipe network in Yongxin County SHST-WB-0111 / Purchase contract of electrical equipments for construction, Expansion, Rehabilitation, Single Stage - One rehabilitation and expansion IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 5,070,400.00 1,802,137.63 Signed 2020-06-25 2020-07-19 2020-06-30 2020-07-24 2020-07-30 2020-08-31 2020-08-14 2020-11-10 2020-09-18 2020-12-09 2021-09-18 Envelope of water plant in Leping, Supply System Dongxiang, Yongxin, Linchuan and Xiushui counties SHST-WB-0112 / Purchase contract of process equipments for construction, Expansion, Rehabilitation, Single Stage - One rehabilitation and expansion IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 6,338,000.00 5,922,229.19 Signed 2020-06-25 2020-07-19 2020-06-30 2020-07-23 2020-07-30 2020-08-31 2020-08-14 2020-11-19 2020-09-18 2020-12-20 2021-09-18 Envelope of water plant in Leping, Supply System Dongxiang, Yongxin, Linchuan and Xiushui counties SHST-WB-0113 / Purchase contract of automatic control equipments for construction, Expansion, Rehabilitation, Single Stage - One rehabilitation and expansion IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,323,900.00 1,204,975.09 Signed 2020-06-25 2020-07-23 2020-06-30 2020-07-23 2020-07-30 2020-08-31 2020-08-14 2020-09-17 2020-09-18 2020-11-30 2021-09-18 Envelope of water plant in Leping, Supply System Dongxiang, Yongxin, Linchuan and Xiushui counties SHST-WB-0114 / Purchase contract of valves for construction, rehabilitation Expansion, Rehabilitation, Single Stage - One and expansion of water plant IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,816,900.00 2,707,491.96 Signed 2020-06-25 2020-07-23 2020-06-30 2020-07-23 2020-07-30 2020-12-10 2020-08-14 2020-12-10 2020-09-18 2021-01-20 2021-09-18 Envelope in Leping, Dongxiang, Supply System Yongxin, Linchuan and Xiushui counties SHST-WB-0115 / Purchase contract of water pumps for construction, rehabilitation Expansion, Rehabilitation, Single Stage - One and expansion of water plant IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,957,700.00 651,839.04 Signed 2020-06-25 2020-07-23 2020-06-30 2020-07-23 2020-07-30 2020-08-31 2020-08-14 2020-09-17 2020-09-18 2020-11-20 2021-09-18 Envelope in Leping, Dongxiang, Supply System Yongxin, Linchuan and Xiushui counties SHST-WB-0119 / Purchase C ontract on PE pipe for rural pi Expansion, Rehabilitation, peline installation from villag Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,911,800.00 2,475,882.82 Signed 2020-07-05 2020-07-10 2020-07-10 2020-07-13 2020-08-09 2020-08-13 2020-08-24 2020-08-27 2020-09-28 2020-10-26 2021-09-28 e to household) in Nanfeng, L Envelope Supply System eping county and Linchuan co unty of Fuzhou City SHST-WB-0124 / The Second Purchase Contract on ductile iron pipe for reconstruction of pipe network for urban water Expansion, Rehabilitation, Single Stage - One supply and extension of rural IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,920,400.00 3,467,504.12 Signed 2020-07-12 2020-07-10 2020-07-17 2020-07-13 2020-08-16 2020-08-13 2020-08-31 2020-08-27 2020-10-05 2020-10-26 2021-10-05 Envelope pipe network in Supply System Yongxin,Xiushui,Nanfeng County and Linchuan county of Fuzhou City SHST-WB-0123 / The Second Purchase Contract on ductile iron pipe for reconstruction of Expansion, Rehabilitation, pipe network for urban water Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,810,500.00 1,885,187.85 Signed 2020-07-05 2020-07-10 2020-07-10 2020-07-13 2020-08-09 2020-08-13 2020-08-24 2020-08-27 2020-09-28 2020-10-26 2021-09-28 supply and extension of rural Envelope Supply System pipe network in Leping, Jinxi county and Dongxiang of Fuzhou city SHST-WB-0120 / Purchase Contract on PE pipe for urban pipeline reconstruction and Expansion, Rehabilitation, rural pipeline installation(from Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,411,600.00 2,727,750.86 Signed 2020-07-12 2020-07-10 2020-07-17 2020-07-13 2020-08-28 2020-08-13 2020-09-27 2020-08-27 2020-11-01 2020-10-26 2021-11-01 village to household) in Envelope Supply System Yongxin,Xiushui,Jinxi County and Dongxiang county of Fuzhou City SHST-WB-0121 / Purchasing Contract on smart water meters for reconstruction of Expansion, Rehabilitation, Single Stage - One urban water supply network IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 4,881,400.00 0.00 Canceled 2020-08-20 2020-08-25 2020-10-06 2020-11-05 2020-12-10 2021-12-10 Envelope and for rural drinking water Supply System users newly increased in Dongxiang County Page 4 SHST-WB-0125 / Purchasing Contract on smart water meters for Reconstruction of Expansion, Rehabilitation, Under Single Stage - One urban water supply network IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,730,400.00 1,380,394.18 Implementati 2020-08-20 2021-02-25 2020-08-25 2021-02-25 2020-10-06 2021-03-25 2020-11-05 2021-03-25 2020-12-10 2021-06-08 Envelope and for rural drinking water Supply System on users newly increased in Linchuan County SHST-WB-0126 / Purchasing Contract on Smart Water Meters for reconstruction of Expansion, Rehabilitation, Under Single Stage - One urban water supply network IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 1,631,200.00 1,398,722.53 Implementati 2020-08-20 2021-02-25 2020-08-25 2021-02-25 2020-10-06 2021-03-25 2020-11-05 2021-03-25 2020-12-10 2021-12-10 Envelope and for rural drinking water Supply System on users newly increased in Nanfeng County SHST-WB-0135 / Purchasing Expansion, Rehabilitation, Contract on sensors used for Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 3,367,600.00 2,559,686.18 Signed 2020-08-25 2020-09-04 2020-08-30 2020-09-04 2020-10-11 2020-10-13 2020-11-10 2020-10-13 2020-12-15 2020-11-25 2021-06-13 pipe network of smart water Envelope Supply System supply system SHST-WB-0138 / Purchasing Contract on Smart Water Meters for reconstruction of Expansion, Rehabilitation, Under Single Stage - One urban water supply network IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,647,900.00 976,232.66 Implementati 2020-11-10 2021-02-25 2020-11-15 2021-02-25 2020-12-27 2021-03-25 2021-01-26 2021-03-25 2021-03-02 2021-08-29 Envelope and for rural drinking water Supply System on users newly increased in Jinxi County SHST-WB-0152 / Purchasing contract on Floating Pumping Expansion, Rehabilitation, Under Station for Water Intake Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 769,200.00 0.00 Implementati 2021-02-22 2021-02-20 2021-02-27 2021-02-21 2021-03-29 2021-03-19 2021-04-28 2021-03-19 2021-06-02 2021-11-29 Project of Hengshan Reservoir Envelope Supply System on and Hefang Reservior in Dongxiang County SHST-WB-0121-1 / The First Purchase Contract on smart water meters for Expansion, Rehabilitation, Under Reconstruction of urban water Single Stage - One IBRD / 88490 and Modernization of Water Post Request for Bids Open - National 2,606,100.00 1,943,036.58 Implementati 2021-02-28 2021-02-25 2021-03-05 2021-02-25 2021-04-16 2021-03-25 2021-05-16 2021-03-25 2021-06-20 2021-12-17 supply network and for rural Envelope Supply System on drinking water users newly increased in Dongxiang County SHST-WB-0153 / The Second Purchase Contract on ductile iron pipe for reconstruction of pipe network for urban water Expansion, Rehabilitation, Under Single Stage - One supply and extension of rural IBRD / 88490 and Modernization of Water Prior Request for Bids Open - National 6,818,200.00 0.00 Implementati 2021-04-05 2021-04-01 2021-04-10 2021-04-02 2021-05-22 2021-05-08 2021-06-21 2021-06-01 2021-07-26 2022-01-22 Envelope pipe network in Supply System on Leping,Dongxiang,Jinxi,Yongx in,Xiushui,Linchuan and Nanfeng County SHST-WB-0155 / The Second Expansion, Rehabilitation, Pending Request for Single Stage - One Purchasing Contract on IBRD / 88490 and Modernization of Water Post Open - National 57,600.00 0.00 Implementati 2021-06-01 2021-07-27 2022-01-23 Quotations Envelope Vehicle for the Project Supply System on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 PROCUREMENT PLAN (Textual Part) Project information: Caribbean Region, Caribbean Digital Transformation Program, P171528 Project Implementation agency: Organisation of Eastern Caribbean States (OECS) Date of the Procurement Plan: November 11, 2020. Period covered by this Procurement Plan: The whole project life. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: The implementing agency is not a national state; hence, there is not a national market and there are no national procurement regulations. This notwithstanding, the implementing agency’s procurement procedures (OECS Procurement Manual Revised June 2016) were found acceptable to the Bank and therefore they may be applied for the Procurement of Works, Goods and Non-consulting Services below the mandatory thresholds for international competition (as specified in the Procurement Plan tables in STEP). These procurements should be in accordance with paragraph 5.3, 5.4 and 5.5 of the Procurement Regulations.. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: not applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – not applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: not applicable; Works: not applicable Other Relevant Procurement Information: The Implementing Agency will proceed with advance contracting in the amount of not exceeding SDR1,180,000.- (US$1.600,000.- equivalent) in accordance with the provisions of paragraph 5.1 – 5.2 of the Procurement Regulations. PROCUREMENT Caribbean : Caribbean Digital Transformation Project PLAN General Information Country: Caribbean Bank’s Approval Date of the Original Procurement Plan: 2020-11-11 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171528 GPN Date: 2021-01-20 Project Name: Caribbean Digital Transformation Project Loan / Credit No: IDA / 66790, IDA / 66820, IDA / 66850 M Executing Agency(ies): inistry of Public Works and Digital Economy WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MPWDE-200369-CW- Pending Digital Skills and Technology Request for Single Stage - One 2022-09- RFQ / Refurbishment of co- IDA / 66850 Post Open - National 0.00 Implementat 2022-01-09 2022-03-06 Adoption Quotations Envelope 02 working space ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MPWDE-200381-GO-DIR Pending Project Implementation / Expansion of Smart Stream IDA / 66790 Post Direct Selection Direct 0.00 Implementati 2021-07-01 2021-07-06 2021-08-10 2022-02-06 Support functionality on DM-MPWDE-200376-GO-RFB / Systems integration, support with introduction of unique Digital Government Pending Single Stage - One digital identifier, development IDA / 66850 Infrastructure, Platforms and Post Request for Bids Open - International 0.00 Implementati 2021-11-01 2021-11-06 2021-12-18 2022-01-17 2022-02-21 2023-09-29 Envelope and implementation of citizen Services on authentication and digital signature solution DM-MPWDE-200379-GO-RFB Digital Government Pending / Supply and Installation of Single Stage - One IDA / 66850 Infrastructure, Platforms and Prior Request for Bids Open - International 0.00 Implementati 2022-08-02 2022-08-07 2022-09-18 2022-10-18 2022-11-22 2023-11-22 Health Management Envelope Services on Information System DM-MPWDE-200375-GO-RFB / Procurement of Hardware and Software Platform for Digital Government Pending Systems Integration and Single Stage - One IDA / 66850 Infrastructure, Platforms and Post Request for Bids Open - International 0.00 Implementati 2022-10-10 2022-10-15 2022-11-26 2022-12-26 2023-01-30 2023-07-29 Implementation of Unique Envelope Services on Digital Identifier, Citizen Authentication and Digital Signature DM-MPWDE-200377-GO-RFB Digital Government Pending Single Stage - One / Roll-out of National ID IDA / 66850 Infrastructure, Platforms and Post Request for Bids Open - International 0.00 Implementati 2023-07-31 2023-08-05 2023-09-16 2023-10-16 2023-11-20 2024-05-18 Envelope Cards Services on DM-MPWDE-200371-GO-RFB Digital Government Pending Single Stage - One / Supply and Installation of IDA / 66850 Infrastructure, Platforms and Post Request for Bids Open - International 0.00 Implementati 2022-10-04 2022-10-09 2022-11-20 2022-12-20 2023-01-24 2023-07-23 Envelope Cybersecurity System Services on DM-MPWDE-221583-GO-DIR Pending Project Implementation / Expansion of SmartStream IDA / 66850 Post Direct Selection Direct 0.00 Implementati 2021-07-01 2021-07-06 2021-08-10 2022-06-28 Support Functionality on DM-MPWDE-220448-CS- Digital Government Pending QCBS / Addition of e- Request for Single Stage - One IDA / 66850 Infrastructure, Platforms and Post Open - National 0.00 Implementati 2021-06-06 2021-08-01 2022-07-27 Payments Services on GoCD Quotations Envelope Services on Platform Under DM-MPWDE-200380-GO-RFB Digital Skills and Technology Single Stage - One IDA / 66850 Post Request for Bids Open - International 0.00 Implementati 2021-03-24 2021-03-26 2021-04-03 2021-03-30 2021-05-03 2021-04-30 2021-05-17 2021-05-07 2021-06-07 2021-08-06 / Procurement of Tablets Adoption Envelope on DM-MPWDE-220449-CS- QCBS / Establishment of an Digital Government Pending Single Stage - One online web and mobile portal IDA / 66850 Infrastructure, Platforms and Post Request for Bids Open - International 0.00 Implementati 2021-06-01 2021-06-06 2021-09-04 2021-10-04 2021-11-08 2023-09-29 Envelope for accessing public services Services on and information DM-MPWDE-200378-GO-RFB Digital Government Pending / Supply and installation of Single Stage - One IDA / 66850 Infrastructure, Platforms and Post Request for Bids Open - International 0.00 Implementati 2024-01-11 2024-01-16 2024-02-27 2024-03-28 2024-05-02 2024-10-29 immigration kiosks at ports Envelope Services on and airports NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MPWDE-200383-CS- Digital Government QCBS / TA for Digital Strategy, Quality And Cost- Pending IDA / 66850 Infrastructure, Platforms and Post Open - International 0.00 2021-07-01 2021-07-22 2021-09-04 2021-10-02 2021-11-01 2021-12-06 2022-01-10 2022-06-29 Standards, Business Based Selection Implementation Services Continuity and Protocols Page 1 DM-MPWDE-200487-CS- QCBS / Development and Digital Skills and Technology Quality And Cost- Pending IDA / 66850 Prior Open - International 0.00 2022-08-16 2022-09-06 2022-10-20 2022-11-17 2022-12-17 2023-01-21 2023-02-25 2024-02-25 Delivery of Digital Skills Adoption Based Selection Implementation Training DM-MPWDE-200485-CS- Digital Government Quality And Cost- Pending QCBS / Bulk Disbursements IDA / 66850 Infrastructure, Platforms and Prior Open - International 0.00 2022-12-12 2023-01-02 2023-02-15 2023-03-15 2023-04-14 2023-05-19 2023-06-23 2024-06-22 Based Selection Implementation Digitization Services DM-MPWDE-200489-CS- QCBS / Development and Digital Skills and Technology Quality And Cost- Pending IDA / 66850 Post Open - International 0.00 2022-08-16 2022-09-06 2022-10-20 2022-11-17 2022-12-17 2023-01-21 2023-02-25 2024-02-25 Delivery of Managerial Adoption Based Selection Implementation Training DM-MPWDE-200482-CS- QCBS / Development of Technical Requirements for ID Digital Government System Implementation and Quality And Cost- Pending IDA / 66850 Infrastructure, Platforms and Post Open - International 0.00 2021-10-01 2021-10-22 2021-12-05 2022-01-02 2022-02-01 2022-03-08 2022-04-12 2022-10-09 business process re- Based Selection Implementation Services engineering and end-to-end digitization of citizen facing services DM-MPWDE-200483-CS- QCBS / TA for Development of Digital Skills and Technology Quality And Cost- Pending IDA / 66850 Post Open - International 0.00 2022-07-01 2022-07-22 2022-09-04 2022-10-02 2022-11-01 2022-12-06 2023-01-10 2024-01-10 Electronic Entry Permit Adoption Based Selection Implementation Mechanism DM-MPWDE-200490-CS-CQS Consultant Digital Skills and Technology Pending / Digital content for distance IDA / 66850 Post Qualification Open - International 0.00 2022-12-08 2022-12-29 2023-02-11 2023-03-13 2023-04-17 2023-10-14 Adoption Implementation learning Selection DM-MPWDE-200492-CS- Project Implementation Quality And Cost- Under QCBS / Project IDA / 66850 Prior Open - International 0.00 2021-05-01 2021-06-15 2021-05-22 2021-06-21 2021-07-05 2021-08-02 2021-09-01 2021-10-06 2021-11-10 2026-06-22 Support Based Selection Implementation Implementation Support DM-MPWDE-200382-CS- QCBS / Support for Quality And Cost- Pending IDA / 66850 Digital Enabling Environment Post Open - International 0.00 2022-08-02 2022-08-23 2022-10-06 2022-11-03 2022-12-03 2023-01-07 2023-02-11 2024-02-11 Development of National Based Selection Implementation Cybersecurity Capability DM-MPWDE-220442-CS- QCBS / Development, Digital Government Quality And Cost- Pending Establishment and Adoption IDA / 66850 Infrastructure, Platforms and Post Open - International 0.00 2021-10-01 2021-10-22 2021-12-05 2022-01-02 2022-02-01 2022-03-08 2022-04-12 2023-04-12 Based Selection Implementation of a Digital Signature Services Framework DM-MPWDE-200484-CS- QCBS / Feasibility for Digital Government Quality And Cost- Pending Implementation of Health IDA / 66850 Infrastructure, Platforms and Post Open - International 0.00 2021-06-01 2021-06-22 2021-08-05 2021-09-02 2021-10-02 2021-11-06 2021-12-11 2022-07-29 Based Selection Implementation Management Information Services System DM-MPWDE-200480-CS- QCBS / TA for Review of Policies, Legislations and Regulations and Development of Recommendations on Digital Government Quality And Cost- Pending Necessary Reforms to IDA / 66850 Infrastructure, Platforms and Post Open - International 0.00 2021-05-02 2021-05-23 2021-07-06 2021-08-03 2021-09-02 2021-10-07 2021-11-11 2022-09-30 Based Selection Implementation Implement an Integrated ID Services System, Authentication Platform, Digital Signature and Electronic Entry Permit Mechanism INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MPWDE-200496-CS- Individual Project Implementation INDV / Recruitment of Project IDA / 66820 Post Consultant Open 48,708.49 Signed 2020-11-02 2020-11-13 2020-12-21 2020-12-08 2021-01-11 2020-12-08 2021-02-15 2020-12-14 2021-08-14 Support Manager Selection DM-MPWDE-200499-CS- Individual Project Implementation INDV / Recruitment of IDA / 66820 Post Consultant Open 39,852.40 Terminated 2020-11-02 2020-11-16 2020-12-21 2020-12-03 2021-01-11 2021-04-05 2021-02-15 2020-12-14 2021-08-14 Support Procurement Specialist Selection DM-MPWDE-200501-CS- Individual INDV / Recruitment of Project Implementation IDA / 66820 Post Consultant Open 35,424.35 Signed 2020-11-02 2020-11-16 2020-12-21 2020-12-03 2021-01-11 2021-04-05 2021-02-15 2020-12-14 2021-08-14 Financial Management Support Selection Specialist DM-MPWDE-200504-CS- Individual Project Implementation Under INDV / Recruitment of IDA / 66820 Post Consultant Open 0.00 2021-01-01 2021-03-16 2021-02-19 2021-03-12 2021-04-16 2021-10-13 Support Implementation Safeguards Specialist, PIU Selection DM-MPWDE-227720-CS- Individual Project Implementation Pending INDV / Recruitment of IDA / 66850 Post Consultant Limited 0.00 2021-04-01 2021-04-06 2021-04-11 2021-04-15 2023-04-14 Support Implementation Procurement Specialist Selection DM-MPWDE-234257-CS- Individual Project Implementation Under INDV / Recruitment of IDA / 66820 Post Consultant Open 0.00 2020-11-02 2020-11-16 2020-12-21 2021-01-11 2021-02-15 2026-07-01 Support Implementation Procurement Specialist Selection Page 2 FOREST CONSERVATION AND SUSTAINABILITY IN THE HEART OF THE COLOMBIAN AMAZON PROJECT – TF018478 PROCUREMENT PLAN I. General 1. Bank’s approval Date of the procurement Plan 2. Date of General Procurement Notice: Dec 09, 2015 3. Period covered by this procurement plan: Until Dec 31, 2017 July 9, 2010 PROCUREMENT Colombia : Forest Conservation and Sustainability in the Heart of the Colombian Amazon PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2017-10-12 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144271 GPN Date: Project Name: Forest Conservation and Sustainability in the Heart of the Colombian Amazon Loan / Credit No: TF / 18478, TF / A5789 Amazonian Institute of Scientific Research Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3 - Sectoral CO-SINCHI-62172-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 4,642.86 4,037.63 Completed 2018-09-17 2018-11-01 2019-01-14 2018-12-01 2019-04-24 Adquisición de balanzas Quotations Envelope Landscape Management Component 3 - Sectoral CO-SINCHI-62173-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 7,142.86 6,073.89 Completed 2018-09-17 2018-11-01 2018-12-28 2018-12-31 2019-02-28 Adquisición de calibradores Quotations Envelope Landscape Management Component 3 - Sectoral CO-SINCHI-62175-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 5,000.00 2,051.59 Completed 2018-09-17 2018-11-01 2018-12-21 2018-12-31 2019-02-21 Adquisición de barrenos Quotations Envelope Landscape Management CO-SINCHI-62177-GO-RFQ / Component 3 - Sectoral Adquisición de Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 5,357.14 0.00 Canceled 2018-09-17 2018-11-01 2018-12-01 conductimetros y Quotations Envelope Landscape Management multiparametrico CO-SINCHI-62178-GO-RFQ / Component 3 - Sectoral Adquisición de Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 2,468.76 1,438.28 Completed 2018-09-17 2018-11-01 2018-11-29 2018-12-01 2019-04-29 deshumidificadores Quotations Envelope Landscape Management industriales CO-SINCHI-62179-GO-RFQ / Component 3 - Sectoral Request for Single Stage - One Adquisición de agitador TF / 18478 Programs for Sustainable Post Open - National 1,714.29 882.65 Completed 2018-09-17 2018-11-01 2018-12-17 2018-12-31 2019-04-18 Quotations Envelope magnético Landscape Management Component 3 - Sectoral CO-SINCHI-77812-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 18,700.43 13,837.87 Completed 2018-10-06 2018-11-04 2018-12-18 2019-01-03 2019-04-22 Adquisición de micrótomo Quotations Envelope Landscape Management Component 3 - Sectoral CO-SINCHI-77815-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 1,428.57 2,294.54 Completed 2018-10-06 2018-11-04 2019-01-21 2019-01-03 2019-04-21 Contador de semillas Quotations Envelope Landscape Management Component 3 - Sectoral CO-SINCHI-77816-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 1,079.69 918.62 Completed 2018-10-06 2018-11-04 2019-01-29 2019-01-03 2019-03-01 Phmetro digital Quotations Envelope Landscape Management CO-SINCHI-77818-GO-RFQ / Component 3 - Sectoral Request for Single Stage - One Centrífuga de mesas TF / 18478 Programs for Sustainable Post Open - National 7,500.00 4,918.77 Completed 2018-10-06 2018-11-04 2019-01-10 2019-01-03 2019-03-10 Quotations Envelope multifuncional Landscape Management Component 3 - Sectoral CO-SINCHI-77822-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 7,044.64 6,216.79 Completed 2018-10-06 2018-11-04 2018-12-21 2019-01-03 2019-03-21 Tejas de Zinc Quotations Envelope Landscape Management Component 3 - Sectoral CO-SINCHI-20363-GO-RFB / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 23,545.00 14,907.58 Completed 2018-10-20 2018-11-24 2019-04-30 2019-01-23 2019-06-30 Microscopio especializado Quotations Envelope Landscape Management Component 3 - Sectoral CO-SINCHI-82754-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 26,714.29 0.00 Canceled 2018-11-06 2018-12-11 2019-02-09 Mobiliario para el laboratorio Quotations Envelope Landscape Management CO-SINCHI-83710-GO-RFQ / Component 3 - Sectoral Request for Single Stage - One Adquisición de equipos para TF / A5789 Programs for Sustainable Post Open - National 7,966.75 4,408.22 Completed 2018-12-08 2019-01-12 2019-04-26 2019-03-13 2019-05-30 Quotations Envelope ascenso y coberturas Landscape Management CO-SINCHI-83711-GO-RFQ / Component 3 - Sectoral Request for Single Stage - One Adquisición de equipos para TF / A5789 Programs for Sustainable Post Open - National 7,142.86 7,021.84 Completed 2018-12-08 2019-01-12 2019-12-31 2019-03-13 2020-04-30 Quotations Envelope suelos Landscape Management Component 3 - Sectoral CO-SINCHI-88273-GO-RFQ / Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 459.72 348.29 Completed 2018-12-17 2019-01-21 2019-02-05 2019-03-22 2019-02-20 Materiales para piscicultura Quotations Envelope Landscape Management CO-SINCHI-88274-GO-RFQ / Component 3 - Sectoral Request for Single Stage - One Alimento granulado para TF / A5789 Programs for Sustainable Post Open - National 1,158.62 667.35 Completed 2018-12-17 2019-01-21 2019-01-22 2019-03-22 2019-02-06 Quotations Envelope peces Landscape Management CO-SINCHI-82759-GO-RFQ / Component 3 - Sectoral Adquisición equipos computo, Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 8,392.86 7,428.23 Completed 2018-12-08 2019-01-12 2019-03-05 2019-03-13 2019-04-05 impresoras, escáner, licencias, Quotations Envelope Landscape Management tablets CO-SINCHI-82763-GO-RFQ / Component 3 - Sectoral Request for Single Stage - One Adquisición de motor fuera de TF / A5789 Programs for Sustainable Post Open - National 11,428.57 9,685.18 Completed 2018-12-01 2019-01-05 2019-02-18 2019-03-06 2019-04-18 Quotations Envelope borda Landscape Management Page 1 CO-SINCHI-82765-GO-RFQ / Component 3 - Sectoral Request for Single Stage - One Adquisición de GPS para el TF / A5789 Programs for Sustainable Post Open - National 1,392.86 1,021.43 Completed 2018-12-05 2019-01-09 2019-02-12 2019-03-10 2019-03-15 Quotations Envelope Diagnóstico de fauna Landscape Management CO-SINCHI-82767-GO-RFQ / Component 3 - Sectoral Adquisición de Cámaras Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 7,857.14 5,368.14 Completed 2018-12-05 2019-01-09 2019-03-11 2019-03-10 2019-04-11 trampa para el Diagnóstico de Quotations Envelope Landscape Management fauna CO-SINCHI-82772-GO-RFQ / Adquisición de balanzas y Component 3 - Sectoral dinamómetros portátiles para Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 1,071.43 1,320.54 Completed 2018-12-05 2019-01-19 2019-03-01 2019-02-18 2019-05-01 pesaje en campo para el Quotations Envelope Landscape Management Diagnóstico y seguimiento de fauna Component 3 - Sectoral CO-SINCHI-93144-GO-RFQ / Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 26,714.29 21,337.34 Completed 2019-03-09 2019-04-13 2019-05-07 2019-05-28 2019-06-30 Mobiliario para el laboratorio Quotations Envelope Landscape Management CO-SINCHI-100837-GO-RFQ / Materiales de campo para parcelas e identificación de poblaciones (Alcohol Component 3 - Sectoral Request for Single Stage - One antiséptico, Bolsas plásticas TF / A5789 Programs for Sustainable Post Open - National 1,935.48 1,717.06 Completed 2019-04-03 2019-05-08 2019-10-01 2019-07-07 2019-11-01 Quotations Envelope (resellables y de papel), Cinta Landscape Management flagging de diferentes colores, Cintas métricas, neveras de icopor, pilas, pintura, etc.) CO-SINCHI-100872-GO-RFQ Component 3 - Sectoral / Alimento para crecimiento, Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 2,709.68 2,042.18 Completed 2019-03-16 2019-04-20 2019-08-23 2019-06-19 2019-09-23 engorde y sostenimiento de Quotations Envelope Landscape Management Arawanas CO-SINCHI-100874-GO-RFQ / Insumos agrícolas y Component 3 - Sectoral Request for Single Stage - One elementos de transporte TF / A5789 Programs for Sustainable Post Open - National 707.35 643.73 Completed 2019-03-18 2019-04-22 2020-01-21 2019-06-21 2020-02-21 Quotations Envelope utilizados en actividad Landscape Management piscícola CO-SINCHI-100881-GO-RFQ Component 3 - Sectoral / equipamiento eléctrico o Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 2,741.94 2,534.19 Completed 2019-03-25 2019-04-29 2019-12-04 2019-06-28 2020-01-30 mecánico para el marcaje y/o Quotations Envelope Landscape Management monitoreo de peces CO-SINCHI-100882-GO-RFQ Component 3 - Sectoral Request for Single Stage - One / Equipos para suministrar TF / A5789 Programs for Sustainable Post Open - National 1,290.32 1,198.82 Completed 2019-04-20 2019-05-25 2019-12-31 2019-07-24 2020-01-31 Quotations Envelope agua o aireación de agua Landscape Management CO-SINCHI-100948-GO-DIR Component 3 - Sectoral / Adquisición de imágenes de TF / A5789 Programs for Sustainable Post Direct Selection Direct 13,738.02 10,420.40 Signed 2019-04-24 2019-10-30 2019-04-29 2019-12-06 2019-06-03 2020-02-25 2019-11-30 sensores remotos Landscape Management CO-SINCHI-100888-GO-RFQ / Adquisición de rack para Component 2 - Forest Request for Single Stage - One comunicación que incluya el TF / A5789 Governance, Management Post Open - National 12,903.23 11,539.92 Completed 2019-04-28 2019-06-02 2019-06-07 2019-08-01 2019-07-22 Quotations Envelope servicio de instalación y and Monitoring adecuaciones CO-SINCHI-100922-GO-RFQ / Adquisición de materiales para salida de campo tales como Alcohol antiséptico, Component 3 - Sectoral Bolsas plásticas, Cinta Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 5,776.13 5,149.77 Completed 2019-04-16 2019-05-21 2019-05-13 2019-07-20 2019-06-30 flagging de diferentes colores, Quotations Envelope Landscape Management Cintas métricas, Fibra en polipropileno amarilla, Flexómetros, Hipoclorito de sodio, Lonas de, Metro, etc. CO-SINCHI-100943-GO-RFQ / Adquisición de reactivos como giberellic acid, kinetina, Component 3 - Sectoral Request for Single Stage - One indoloe 3 acetic acid, butyric TF / 18478 Programs for Sustainable Post Open - National 10,968.88 5,524.06 Completed 2019-04-10 2019-05-15 2019-06-07 2019-07-14 2019-06-28 Quotations Envelope acid, ácido bórico, cloruro de Landscape Management sodio, glucosa, fosfato, glicerol, sulfato de cobre, etc. CO-SINCHI-100945-GO-RFQ / Adquisición de materiales EE El Trueno y CEA tales como Bolsas plástica para vivero, Component 3 - Sectoral Tierra, Arena, Limo, Sulfatos, Request for Single Stage - One TF / 18478 Programs for Sustainable Post Open - National 22,851.23 13,289.18 Completed 2019-04-14 2019-05-19 2019-05-24 2019-07-18 2019-06-20 Melaza, Canecas plásticas, Quotations Envelope Landscape Management Tubería pvc, Palines, Polisombra, Semillas de especies forestales, frutales y forrajeras, Alambre liso, etc. CO-SINCHI-100864-GO-RFQ / Adquisición de Implementos Component 3 - Sectoral para pesca, biometrías, Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 2,580.65 2,282.79 Completed 2019-04-15 2019-05-20 2019-09-20 2019-07-19 2019-10-20 manejo de peces tales como Quotations Envelope Landscape Management gramera, ictiometro, dinamómetros, básculas, etc. CO-SINCHI-100870-GO-RFQ / Adquisición de materiales para operar la Component 3 - Sectoral infraestructura piscícolas tales Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 1,129.03 996.27 Completed 2019-04-15 2019-05-20 2019-09-20 2019-07-19 2019-10-20 como Baldes, palas, picos, Quotations Envelope Landscape Management tuberías, machetes, limas triangulares, 'chinchorro, bolsas plásticas, etc. Page 2 CO-SINCHI-100926-GO-RFQ / Adquisición de equipos de analítica y medición tales como Medidor de radiación PAR, Higrometro, Termómetro Component 3 - Sectoral Request for Single Stage - One infrarrojo, Medidor de TF / 18478 Programs for Sustainable Post Open - National 14,828.71 19,456.56 Completed 2019-04-14 2019-05-19 2019-06-14 2019-07-18 2019-06-30 Quotations Envelope máximas y mínimas, Timer, Landscape Management Motortool, Agitador con incubadora, Cabina de bioseguridad, Micropipetas x 4, Autoclave, etc. CO-SINCHI-100946-GO-RFQ / Adquisición de equipos para talleres tales como Video Component 2 - Forest Request for Single Stage - One beam, Parlante, estaciones de TF / 18478 Governance, Management Post Open - National 35,806.35 29,645.60 Completed 2019-04-14 2019-05-19 2019-06-20 2019-07-18 2019-06-30 Quotations Envelope trabajo, teclados, mouse, and Monitoring discos duros, adaptadores de server module, etc.etc. Component 3 - Sectoral CO-SINCHI-100910-GO-DIR TF / A5789 Programs for Sustainable Post Direct Selection Direct 11,516.13 0.00 Canceled 2019-04-11 2019-04-16 2019-05-21 2019-11-17 / Combustible en Inírida Landscape Management CO-SINCHI-108709-GO-RFQ Component 3 - Sectoral Request for Single Stage - One / Adquisición de puestos de TF / 18478 Programs for Sustainable Post Open - National 19,354.84 16,360.41 Completed 2019-04-27 2019-06-01 2019-06-10 2019-06-30 2019-06-28 Quotations Envelope trabajo para la sede Bogotá Landscape Management CO-SINCHI-130061-GO-RFQ Component 3 - Sectoral Request for Single Stage - One / Cámaras fotográficas TF / A5789 Programs for Sustainable Post Open - National 4,193.55 3,729.52 Completed 2019-10-05 2019-11-02 2019-11-19 2020-01-01 2019-12-19 Quotations Envelope compactas Landscape Management CO-SINCHI-130070-GO-RFQ Component 3 - Sectoral Request for Single Stage - One / Trailer para cargar el motor TF / A5789 Programs for Sustainable Post Open - National 4,193.55 3,181.61 Completed 2019-10-14 2019-11-11 2019-12-31 2020-01-10 2020-02-29 Quotations Envelope del bote Landscape Management CO-SINCHI-130109-GO-RFQ Component 3 - Sectoral Request for Single Stage - One / Guías aves McMullan y Guías TF / A5789 Programs for Sustainable Post Open - National 754.84 661.15 Completed 2019-10-05 2019-11-19 2019-12-30 2020-01-18 2020-01-30 Quotations Envelope aves Ayerbe Landscape Management Component 3 - Sectoral CO-SINCHI-140544-GO-RFQ Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 4,516.13 165,923.41 Completed 2019-11-05 2019-12-03 2020-02-14 2020-02-01 2020-07-30 / Adquisición de binoculares Quotations Envelope Landscape Management CO-SINCHI-140607-GO-RFQ Component 3 - Sectoral Request for Single Stage - One / Equipos de cómputo y TF / A5789 Programs for Sustainable Post Open - National 2,898.10 1,794.33 Completed 2019-11-16 2019-12-21 2020-03-16 2020-02-19 2020-07-30 Quotations Envelope licencias Landscape Management Component 3 - Sectoral CO-SINCHI-130110-GO-RFQ Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 4,516.13 0.00 Canceled 2019-10-28 2019-12-23 2020-06-20 / Adquisición de Binoculares Quotations Envelope Landscape Management CO-SINCHI-100833-GO-RFQ / Materiales para vivero Component 3 - Sectoral (Bolsas plástica , Tierra, Limo, Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 13,774.19 11,180.07 Completed 2019-03-23 2019-04-27 2020-06-05 2019-06-26 2020-08-15 Sulfatos, Melaza, Canecas, Quotations Envelope Landscape Management Tubería, Palines, Polisombra, Semillas, Alambre, etc.) CO-SINCHI-100858-GO-RFQ Component 3 - Sectoral Request for Single Stage - One / Insumos y reactivos para TF / A5789 Programs for Sustainable Post Open - National 6,451.61 8,163.62 Completed 2020-07-25 2020-09-08 2020-09-29 2020-10-08 2021-01-31 Quotations Envelope análisis de suelos Landscape Management CO-SINCHI-170514-GO-RFQ / Implementos para pesca, para biometrías y/o manejo Component 3 - Sectoral Request for Single Stage - One de peces y Sonda(s) TF / A5789 Programs for Sustainable Post Open - National 7,071.43 5,617.52 Completed 2020-08-09 2020-09-06 2020-11-30 2020-11-05 2021-01-18 Quotations Envelope electrónicas para monitorear Landscape Management variables fisicoquímicas del agua (dos lotes) CO-SINCHI-170515-GO-RFQ Component 3 - Sectoral / 'Alimento para crecimiento , Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 3,571.43 2,702.11 Completed 2020-08-22 2020-09-26 2021-01-14 2020-11-25 2021-01-29 engorde y sostenimiento de Quotations Envelope Landscape Management Arawanas CO-SINCHI-170517-GO-RFQ Component 3 - Sectoral Request for Single Stage - One / 'Computador, equipos de TF / A5789 Programs for Sustainable Post Open - National 3,571.43 1,967.83 Completed 2021-02-13 2021-03-20 2020-11-26 2021-05-19 2021-01-23 Quotations Envelope impresión y/o tabletas Landscape Management CO-SINCHI-170516-GO-RFQ Component 3 - Sectoral / Insumos agrícolas y otros Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 6,875.39 5,373.28 Completed 2020-12-19 2021-01-23 2020-09-24 2021-03-24 2020-10-15 elementos utilizados en Quotations Envelope Landscape Management actividades piscicolas CO-SINCHI-229286-GO-RFQ / El contratista se obliga con el Instituto Amazónico de Component 3 - Sectoral Pending Investigaciones Científicas Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 747.56 0.00 Implementati 2021-07-06 2021-08-06 2021-09-05 “Sinchi” a realizar el Quotations Envelope Landscape Management on suministro de materiales de papelería para el componente 3.3.1.1 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-SINCHI-100884-NC-RFQ Component 3 - Sectoral / Servicio para establecer Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 3,225.81 2,633.31 Completed 2019-04-13 2019-06-08 2019-10-28 2019-12-05 2019-12-28 estanques piscícolas para Quotations Envelope Landscape Management manejo de arawana plateada CO-SINCHI-200792-NC-RFQ Component 3 - Sectoral Pending / Registro y edición de Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 3,333.33 0.00 Implementati 2021-03-13 2021-05-08 2021-11-04 fotografías de peces en río Quotations Envelope Landscape Management on Putumayo y río Caquetá Page 3 CO-SINCHI-107576-NC-RFQ Component 3 - Sectoral Request for Single Stage - One / Impresión de guía de aves y TF / A5789 Programs for Sustainable Post Open - National 20,645.16 0.00 Canceled 2021-04-10 2021-06-05 2021-12-02 Quotations Envelope libro (fauna) Landscape Management CO-SINCHI-234407-NC-RFQ / Prestar sus servicios de impresión para los materiales de apoyo necesario para el Component 3 - Sectoral Pending desarrollo de talleres del Request for Single Stage - One TF / A5789 Programs for Sustainable Post Open - National 1,364.95 0.00 Implementati 2021-07-17 2021-08-22 2021-12-20 componente 3.3.1.1. Apoyo al Quotations Envelope Landscape Management on diagnóstico y monitoreo de la fauna terrestre de consumo, comercialización o con conflictos de uso. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-SINCHI-20472-CS-LCS / Consultoría para la Component 3 - Sectoral Implementación y desarrollo Least Cost TF / 18478 Programs for Sustainable Post Open - National 134,761.00 0.00 Canceled 2017-07-04 2017-07-25 2017-11-02 2017-12-28 2018-01-27 2018-02-06 2018-02-21 2018-08-20 de estrategias de ventas y Selection Landscape Management Mercadeo de portafolio de productos del bosque. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-SINCHI-20500-CS-INDV Component 3 - Sectoral Individual / consultor para apoyo a la TF / 18478 Programs for Sustainable Post Consultant Limited 20,448.00 0.00 Canceled 2017-02-22 2017-02-27 2017-03-20 2017-04-24 2017-10-21 gestion y formulacion del Landscape Management Selection PDRIET Guaviare CO-SINCHI-20480-CS-INDV Component 3 - Sectoral Individual / consultor de apoyo para TF / 18478 Programs for Sustainable Post Consultant Limited 9,737.00 0.00 Canceled 2017-07-19 2017-07-24 2017-08-14 2017-09-18 2018-03-17 alcaldias en formulacion PGAT Landscape Management Selection 1 CO-SINCHI-20344-CS-INDV Component 3 - Sectoral Individual / consultor de apoyo para TF / 18478 Programs for Sustainable Post Consultant Limited 9,737.00 0.00 Canceled 2017-07-17 2017-07-22 2017-08-12 2017-09-16 2018-03-15 alcaldias en formulacion PGAT Landscape Management Selection 2 CO-SINCHI-20501-CS-INDV Component 3 - Sectoral Individual / consultor de apoyo para TF / 18478 Programs for Sustainable Post Consultant Limited 9,737.00 0.00 Canceled 2017-02-22 2017-02-27 2017-03-20 2017-04-24 2017-10-21 alcaldias en formulacion PGAT Landscape Management Selection 3 CO-SINCHI-20497-CS-INDV / Consultoría para la Component 3 - Sectoral Individual construcción de modelo de TF / 18478 Programs for Sustainable Post Consultant Limited 21,908.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 bosques de paz en municipios Landscape Management Selection priorizados de Amazonia CO-SINCHI-20498-CS-INDV / Consultoría para la consolidación oportunidades de uso de productos no Component 3 - Sectoral Individual maderables del bosque e TF / 18478 Programs for Sustainable Post Consultant Limited 43,817.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 identificación barreras y Landscape Management Selection vacíos normativos para generar una dinámica formal y legal CO-SINCHI-20447-CS-INDV / Consultoría para realizar el Component 3 - Sectoral Individual enlace de modelos de negocio TF / 18478 Programs for Sustainable Post Consultant Limited 58,423.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 forestal a fondos de inversión Landscape Management Selection y opciones de fomento administradas por MADR CO-SINCHI-20499-CS-INDV / Consultoría para el desarrollo acuerdo MADR - Apoyo formulación Planes de Component 3 - Sectoral Individual Asistencia Técnica - TF / 18478 Programs for Sustainable Post Consultant Limited 14,606.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Componente forestal, Landscape Management Selection municipios SVC, CCH, Solano, Retorno, Calamar y SJG, para acceso a incentivo MADR CO-SINCHI-20496-CS-INDV / Consultoría para la valoración económica de Component 3 - Sectoral Individual todas las opciones de uso del TF / 18478 Programs for Sustainable Post Consultant Limited 37,975.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 suelo ya identificadas y Landscape Management Selection análisis de sensibilidad en Guaviare y Caquetá) CO-SINCHI-20468-CS-INDV Component 3 - Sectoral Individual / Consultor estadístico para TF / 18478 Programs for Sustainable Post Consultant Limited 23,369.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 análisis del paisaje Landscape Management Selection CO-SINCHI-20454-CS-INDV / Consultor Para gestion de PGAT en el marco del Component 3 - Sectoral Individual convenio Sinchi- TF / 18478 Programs for Sustainable Post Consultant Open 36,832.00 0.00 Canceled 2017-06-22 2017-08-10 2017-08-31 2017-10-05 2018-04-03 Gobernaciones y ruta de Landscape Management Selection trabajo con Direccion de Innovacion del MADR plataforma 360 Page 4 CO-SINCHI-20453-CS-INDV / Consultoría para el desarrollo acuerdo MADR - Component 3 - Sectoral Individual Apoyo formulación Planes de TF / 18478 Programs for Sustainable Post Consultant Limited 14,606.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Asistencia Técnica - Landscape Management Selection Componente forestal, municipio CCH CO-SINCHI-20448-CS-INDV / Consultoría para el desarrollo acuerdo MADR - Component 3 - Sectoral Individual Apoyo formulación Planes de TF / 18478 Programs for Sustainable Post Consultant Limited 14,606.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Asistencia Técnica - Landscape Management Selection Componente forestal, municipio Solano CO-SINCHI-20450-CS-INDV / Consultoría para el desarrollo acuerdo MADR - Component 3 - Sectoral Individual Apoyo formulación Planes de TF / 18478 Programs for Sustainable Post Consultant Limited 14,606.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Asistencia Técnica - Landscape Management Selection Componente forestal, municipio Retorno, para acceso a incentivo MADR CO-SINCHI-20458-CS-INDV / Consultoría para el desarrollo acuerdo MADR - Component 3 - Sectoral Individual Apoyo formulación Planes de TF / 18478 Programs for Sustainable Post Consultant Limited 14,606.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Asistencia Técnica - Landscape Management Selection Componente forestal, municipio Calamar para acceso a incentivo MADR CO-SINCHI-20457-CS-INDV / Consultoría para el desarrollo acuerdo MADR - Component 3 - Sectoral Individual Apoyo formulación Planes de TF / 18478 Programs for Sustainable Post Consultant Limited 14,606.00 0.00 Canceled 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Asistencia Técnica - Landscape Management Selection Componente forestal, municipio SJG, para acceso a incentivo MADR CO-SINCHI-20574-CS-INDV Component 3 - Sectoral Individual / Asesor para le gestion TF / 18478 Programs for Sustainable Post Consultant Direct 42,587.00 46,883.40 Completed 2017-05-15 2018-02-28 2017-05-25 2017-06-15 2018-04-02 2017-07-20 2018-04-02 2018-01-16 2019-06-30 interinstitucional Landscape Management Selection CO-SINCHI-51790-CS-INDV / Consultoría para apoyar el Component 3 - Sectoral Individual proceso de acuerdo sectorial TF / 18478 Programs for Sustainable Post Consultant Direct 35,357.15 34,458.93 Completed 2018-03-19 2018-03-13 2018-03-29 2018-04-19 2018-03-23 2018-05-24 2018-04-11 2018-11-20 2019-01-11 para la gestión y articulación Landscape Management Selection proyectos GEF - MADR - Pilar 3 de Visión Amazonia. CO-SINCHI-51791-CS-INDV / Consultoría para la implementación del programa Component 3 - Sectoral Individual Bosques de Paz desde la TF / 18478 Programs for Sustainable Post Consultant Limited 19,286.00 14,617.80 Completed 2018-03-28 2018-04-03 2018-04-02 2018-04-03 2018-04-23 2018-05-23 2018-05-28 2018-05-23 2018-11-24 2019-06-23 dimensión social y facilitar su Landscape Management Selection articulación en los territorios de la región Amazonía CO-SINCHI-62154-CS-INDV / Consultor para la construcción de los planes generales de asistencia Component 3 - Sectoral Individual técnica rural PGAT con TF / 18478 Programs for Sustainable Post Consultant Direct 11,607.14 11,111.10 Completed 2018-05-16 2018-05-22 2018-05-23 2018-05-28 2018-05-23 2018-06-04 2018-05-25 2018-11-05 2018-10-30 enfoque agroambiental con Landscape Management Selection base en la plataforma productores 360 Asistencia Técnica CO-SINCHI-51789-CS-INDV / Consultoria para el Component 3 - Sectoral Individual desarrollo e Implementación TF / 18478 Programs for Sustainable Post Consultant Limited 22,500.00 0.00 Canceled 2018-07-09 2018-07-14 2018-08-04 2018-09-08 2019-03-07 de una estrategia de Landscape Management Selection sostenbilidad del enfoque socioempresarial CO-SINCHI-100890-CS-INDV Component 3 - Sectoral Individual / Gestor Predial para piloto TF / 18478 Programs for Sustainable Post Consultant Limited 12,903.23 11,925.60 Completed 2019-03-04 2019-03-07 2019-03-09 2019-03-29 2019-03-19 2019-05-13 2019-03-29 2019-05-13 2019-06-27 2019-06-30 formalización tierras y Landscape Management Selection derechos de uso - Guaviare CO-SINCHI-100893-CS-INDV Component 3 - Sectoral Individual / Gestor Predial para piloto TF / 18478 Programs for Sustainable Post Consultant Limited 12,903.23 11,703.60 Completed 2019-03-04 2019-03-07 2019-03-09 2019-03-28 2019-03-19 2019-05-07 2019-03-29 2019-05-13 2019-06-27 2019-06-30 formalización tierras y Landscape Management Selection derechos de uso - Caquetá CO-SINCHI-100902-CS-INDV Component 3 - Sectoral Individual / Crear el contenido de TF / 18478 Programs for Sustainable Post Consultant Limited 13,322.58 689,252.40 Completed 2019-03-04 2019-03-12 2019-03-09 2019-03-22 2019-03-19 2019-03-27 2019-03-29 2019-03-29 2019-06-27 2019-06-30 comunicación para la Landscape Management Selection culminación del GEF 5 CO-SINCHI-100904-CS-INDV / Consultoría para la valoración económica de Component 3 - Sectoral Individual todas las opciones de uso del TF / 18478 Programs for Sustainable Post Consultant Limited 9,761.68 0.00 Canceled 2019-03-04 2019-03-09 2019-03-19 2019-03-29 2019-06-27 suelo ya identificadas y Landscape Management Selection análisis de sensibilidad en Guaviare y Caquetá) CO-SINCHI-100908-CS-INDV Component 3 - Sectoral Individual / Consultor estadístico para TF / 18478 Programs for Sustainable Post Consultant Limited 10,446.77 9,424.36 Completed 2019-03-04 2019-03-22 2019-03-09 2019-04-03 2019-03-19 2019-05-02 2019-03-29 2019-05-03 2019-06-27 2019-06-30 análisis del paisaje Landscape Management Selection CO-SINCHI-100942-CS-INDV Component 3 - Sectoral Individual / Diseño de publicidad e TF / 18478 Programs for Sustainable Post Consultant Limited 3,548.39 1,895.99 Completed 2019-03-04 2019-03-07 2019-03-09 2019-04-03 2019-03-30 2019-06-03 2019-05-04 2019-06-07 2019-10-31 2019-06-30 identidad de marcas Landscape Management Selection CO-SINCHI-107578-CS-INDV / Coordinador metodológico y Component 2 - Forest Individual temático para ecología del TF / 18478 Governance, Management Post Consultant Limited 7,741.94 6,984.24 Completed 2019-04-01 2019-03-13 2019-04-06 2019-04-01 2019-04-16 2019-05-13 2019-04-26 2019-05-13 2019-07-25 2019-06-30 paisaje, planificación and Monitoring Selection territorial y modelamiento ecológico. Page 5 CO-SINCHI-107579-CS-INDV / Profesional para desarrollar el componente biofísico para Component 2 - Forest Individual el modelamiento ecológico, TF / 18478 Governance, Management Post Consultant Limited 7,741.94 6,984.24 Completed 2019-04-01 2019-03-19 2019-04-06 2019-04-02 2019-04-16 2019-05-03 2019-04-26 2019-05-03 2019-07-25 2019-06-30 ecología del paisaje, manejo, and Monitoring Selection conservación y planificación territorial. CO-SINCHI-107580-CS-INDV / 'Profesional para desarrollar el componente SIG para el Component 2 - Forest Individual modelamiento ecológico, TF / 18478 Governance, Management Post Consultant Limited 6,774.19 6,104.49 Completed 2019-04-01 2019-03-19 2019-04-06 2019-03-27 2019-04-16 2019-05-24 2019-04-26 2019-05-24 2019-07-25 2019-06-30 ecología del paisaje, manejo, and Monitoring Selection conservación y planificación territorial. CO-SINCHI-107581-CS-INDV Component 3 - Sectoral Individual / Consultoría para el TF / 18478 Programs for Sustainable Post Consultant Limited 16,309.50 10,563.87 Completed 2019-04-01 2019-03-28 2019-04-06 2019-04-05 2019-04-16 2019-05-16 2019-04-26 2019-05-24 2019-07-25 2019-06-30 diagnóstico y desarrollo de la Landscape Management Selection cadena productiva forestal CO-SINCHI-130076-CS-INDV Component 3 - Sectoral Individual / Asesor para la gestión TF / A5789 Programs for Sustainable Post Consultant Direct 19,306.45 18,135.15 Completed 2019-09-30 2019-12-03 2019-10-10 2019-11-17 2019-10-31 2019-11-26 2019-12-05 2019-12-20 2020-06-02 2020-10-31 institucional Landscape Management Selection Component 3 - Sectoral Individual CO-SINCHI-130075-CS-INDV TF / A5789 Programs for Sustainable Post Consultant Direct 32,903.23 29,844.18 Completed 2019-09-30 2019-10-17 2019-10-10 2019-10-31 2019-10-31 2019-11-15 2019-12-05 2019-11-15 2020-11-29 2020-11-15 / Comunicador social Landscape Management Selection CO-SINCHI-135551-CS-INDV Component 3 - Sectoral Individual / Consultor para valoración TF / A5789 Programs for Sustainable Post Consultant Limited 9,677.42 7,340.40 Completed 2019-10-15 2019-11-07 2019-10-20 2020-02-25 2019-11-10 2020-03-20 2019-12-15 2020-03-30 2020-06-12 2020-09-15 económica y pago por Landscape Management Selection servicios ambientales CO-SINCHI-170511-CS-INDV Component 3 - Sectoral Individual / Diagramación del libro Sitio TF / A5789 Programs for Sustainable Post Consultant Limited 2,666.67 2,109.12 Completed 2020-05-10 2020-06-10 2020-05-15 2020-07-01 2020-06-05 2020-08-06 2020-07-10 2020-08-18 2021-01-06 2021-02-26 Ramsar Landscape Management Selection CO-SINCHI-130111-CS-INDV Component 3 - Sectoral Individual / Profesional para elaborar TF / A5789 Programs for Sustainable Post Consultant Limited 6,451.61 0.00 Canceled 2020-06-21 2020-06-26 2020-07-17 2020-08-21 2021-02-17 tipografía especial lenguas Landscape Management Selection indígenas CO-SINCHI-170512-CS-INDV Component 3 - Sectoral Individual / 'Profesional para apoyo a Under TF / A5789 Programs for Sustainable Post Consultant Limited 2,666.67 0.00 2021-02-01 2021-06-15 2021-02-06 2021-02-27 2021-04-03 2021-09-30 Coordinación para el Implementation Landscape Management Selection componente piscicola CO-SINCHI-200728-CS-INDV Component 3 - Sectoral Individual / Diagramación y corrección TF / A5789 Programs for Sustainable Post Consultant Limited 4,838.71 0.00 Canceled 2020-11-26 2020-12-17 2020-12-01 2020-12-22 2021-01-26 2021-07-25 de estilo Landscape Management Selection CO-SINCHI-211257-CS-INDV / Realizar la diagramación y corrección de estilo de dos Component 3 - Sectoral Individual libros: Caso de Estudio El TF / A5789 Programs for Sustainable Post Consultant Limited 4,477.61 4,118.55 Signed 2021-02-15 2021-02-22 2021-02-20 2021-02-23 2021-03-02 2021-04-14 2021-03-17 2021-04-14 2021-05-16 Capricho y Evaluación de la Landscape Management Selection cadena productiva forestal (productos maderables y no maderables) CO-SINCHI-210047-CS-INDV / Se obliga para con el Component 3 - Sectoral Individual Instituto Sinchi a gestionar los TF / A5789 Programs for Sustainable Post Consultant Direct 14,328.36 0.00 Canceled 2021-02-15 2021-03-25 2021-02-25 2021-03-02 2021-03-12 2021-08-09 componentes necesarios para Landscape Management Selection una comunicación efectiva y asertiva del proyecto CO-SINCHI-210052-CS-INDV Component 3 - Sectoral Individual / Profesional para generación TF / A5789 Programs for Sustainable Post Consultant Limited 2,842.39 0.00 Canceled 2021-03-15 2021-03-20 2021-04-10 2021-05-15 2021-11-11 de información biológica y Landscape Management Selection pesquera de especies CO-SINCHI-230147-CS-INDV / desarrollar un Plan de Comunicaciones del componente 3.3 Desarrollo de planes para promover Component 3 - Sectoral Individual Pending prácticas sostenibles de TF / A5789 Programs for Sustainable Post Consultant Limited 7,992.54 0.00 2021-06-14 2021-06-19 2021-07-10 2021-07-20 2021-10-18 Implementation gestión Landscape Management Selection del uso de la tierra y de los recursos naturales que contribuyan a reducir la presión sobre los bosques CO-SINCHI-100860-CS-INDV / El contratista se obliga con el Instituto Amazónico de Investigaciones Científicas Component 3 - Sectoral Individual “Sinchi” a prestar sus servicios Pending TF / A5789 Programs for Sustainable Post Consultant Limited 9,288.18 0.00 2021-07-01 2021-07-06 2021-07-27 2021-08-20 2021-10-19 profesionales para realizar la Implementation Landscape Management Selection diagramación y corrección de estilo de la Guía de aves y libro de los resultados del componente 3.3.1.1. Page 6 PROCUREMENT PLAN (Textual Part) Project information: St Lucia Human Capital Resilience Project 6556- LC Project Implementation agencies: Ministry of Education, Innovation and Gender Relations and Ministry of Equity, Social Justice, Local Government and Empowerment Date of the Procurement Plan: 1 February 2021 Period covered by this Procurement Plan: 28 July 2020 to 27 January 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). “Not Applicable” Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. PROCUREMENT St. Lucia : Saint Lucia Human Capital Resilience Project PLAN General Information Country: St. Lucia Bank’s Approval Date of the Original Procurement Plan: 2021-02-10 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170445 GPN Date: 2021-04-14 Project Name: Saint Lucia Human Capital Resilience Project Loan / Credit No: IDA / 65560 M Executing Agency(ies): INISTRY OF EDUCATION, INNOVATION, GENDER RELATIONS AND SUSTAINABLE DEVELOPMENT WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01/G/HCRP/04/2021 / Technical Assistance, Under Supply of computer devices Capacity Building, TVET Request for Single Stage - One IDA / 65560 Post Open - National 14,000.00 0.00 Implementati 2021-04-18 2021-05-03 2021-05-18 for the Project Implementation Equipment and Furniture, and Quotations Envelope on Unit (PIU) Project Management 02/G/HCRP/00/2021 / Strengthening Technical and Pending Request for Single Stage - One Supply of office equipment for IDA / 65560 Vocational Education and Post Open - National 6,000.00 0.00 Implementati 2021-02-17 2021-04-14 2021-10-11 Quotations Envelope the TVET Unit Training (TVET) on Technical Assistance, 03/G/HCRP/ 05/2021 / Pending Capacity Building, TVET Request for Single Stage - One Supply of office furniture for IDA / 65560 Post Limited 15,000.00 0.00 Implementati 2021-06-02 2021-07-28 2021-09-27 Equipment and Furniture, and Quotations Envelope the PIU office on Project Management NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 00/CS/HCRP/00/2020 / Year Strengthening Technical and Consultant Pending 1 Labor Market Needs IDA / 65560 Vocational Education and Post Qualification Limited 120,000.00 0.00 2021-02-11 2021-02-25 2021-03-27 2021-05-01 2021-10-28 Implementation Assessment Training (TVET) Selection 016/CS/HCRP/00/2021 / Consulting services to develop Technical Assistance, a communication strategy and Consultant Capacity Building, TVET Under implementation plan for the IDA / 65560 Post Qualification Open - National 60,000.00 0.00 2021-03-05 2021-06-10 2021-03-26 2021-05-09 2021-06-08 2021-07-13 2022-01-09 Equipment and Furniture, and Implementation MoEQ and support for the Selection Project Management implementation of the strategy 021/CS/HCRP/00/2021 / Consultancy Services - IT Technical Assistance, System implementation: Capacity Building, TVET Quality And Cost- Pending Provide technical assistance to IDA / 65560 Post Open - International 1,500,000.00 0.00 2021-03-26 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-10-05 Equipment and Furniture, and Based Selection Implementation the MoEQ and GITS and to Project Management develop an integrated social information system 020/CS/HCRP/00/2021 / Living Condition Survey: Technical assistance to the Consultant CSO to support review of the Strengthening the Social Pending IDA / 65560 Post Qualification Open - National 100,000.00 0.00 2021-04-02 2021-04-23 2021-06-06 2021-07-06 2021-08-10 2022-02-06 instrument and carry out Protection System Implementation Selection implementation analysis of the round of survey which is planned for 2022 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Technical Assistance, 002/CSIC/HCRP/00/2020 / Individual Capacity Building, TVET Under Finance Officer for the Project IDA / 65560 Post Consultant Open 39,900.00 0.00 2021-02-09 2020-06-01 2021-03-30 2021-04-20 2021-05-25 2021-11-21 Equipment and Furniture, and Implementation Implementation Unit Selection Project Management Technical Assistance, 004/CSIC/HCRP/00/2020 / Individual Capacity Building, TVET Under Technical Coordinator for the IDA / 65560 Post Consultant Open 43,950.00 0.00 2021-03-01 2021-03-29 2021-04-19 2021-05-10 2021-06-14 2021-12-11 Equipment and Furniture, and Implementation Project Implementation Unit Selection Project Management Technical Assistance, 005/CSIC/HCRP/00/2020 / Individual Capacity Building, TVET Pending Monitoring and Evaluation IDA / 65560 Post Consultant Open 39,000.00 0.00 2021-02-16 2021-04-06 2021-04-27 2021-06-01 2021-11-28 Equipment and Furniture, and Implementation Officer for the PIU Selection Project Management 006/CSIC/HCRP/00/2020 / Technical Assistance, Individual Social and Environmental Capacity Building, TVET Pending IDA / 65560 Post Consultant Open 35,100.00 0.00 2021-03-01 2021-04-19 2021-05-10 2021-06-14 2021-12-11 Specialist for the Project Equipment and Furniture, and Implementation Selection Implementation Unit Project Management Page 1 Technical Assistance, 008/CSIC/HCRP/00/2020 / Individual Capacity Building, TVET Pending Accounts Clerk for the Project IDA / 65560 Post Consultant Open 19,772.00 0.00 2021-02-10 2021-03-31 2021-04-21 2021-05-26 2021-11-22 Equipment and Furniture, and Implementation Implementation Unit Selection Project Management 009/CSIC/HCRP/02/2021 / Technical Assistance, Individual Consultancy services to review Capacity Building, TVET Under IDA / 65560 Post Consultant Open 37,037.00 0.00 2021-02-10 2021-02-11 2021-03-31 2021-04-21 2021-05-26 2021-11-22 the National Social Protection Equipment and Furniture, and Implementation Selection Policy for the MoEQ Project Management 010/CSIC/HCRP/02/2021 / Technical Assistance, Consultancy services to Individual Capacity Building, TVET Under provide technical assistance IDA / 65560 Post Consultant Limited 35,000.00 0.00 2021-02-12 2021-06-03 2021-02-17 2021-03-10 2021-04-14 2021-10-11 Equipment and Furniture, and Implementation to MoEQ and draft the Selection Project Management Graduation\Exit Strategy 011/CSIC/HCRP/02/2021 / Consultancy services to develop Programme Technical Assistance, Individual Operations Manual for PAP Capacity Building, TVET Pending IDA / 65560 Post Consultant Limited 50,000.00 0.00 2021-02-11 2021-02-16 2021-03-09 2021-04-13 2021-10-10 and KSL (to include Referral Equipment and Furniture, and Implementation Selection Protocols, Feedback Project Management Mechanisms and Appeals and Grievance Mechanism) Technical Assistance, 003/CSIC/HCRP/00/2020 / Individual Capacity Building, TVET Pending Procurement Officer for the IDA / 65560 Post Consultant Open 35,100.00 0.00 2021-02-02 2021-03-23 2021-04-13 2021-05-18 2021-11-14 Equipment and Furniture, and Implementation Project Implementation Unit Selection Project Management Technical Assistance, 001/CSIC/HCRP/00/2020 / Individual Capacity Building, TVET Pending Project Manager for the IDA / 65560 Post Consultant Open 79,950.00 0.00 2021-05-09 2021-06-27 2021-07-18 2021-08-22 2022-02-18 Equipment and Furniture, and Implementation Project Implementation Unit Selection Project Management 007/CSIC/HCRP/00/2021 / Technical Assistance, Individual Administrative Assistant for Capacity Building, TVET Pending IDA / 65560 Post Consultant Open 26,489.00 0.00 2021-02-10 2021-03-31 2021-04-21 2021-05-26 2021-11-22 the Project Implementation Equipment and Furniture, and Implementation Selection Unit Project Management 013/CSIC/HCRP/00/2021 / Technical Assistance, Procuring the services of an Individual Capacity Building, TVET Under international procurement IDA / 65560 Post Consultant Limited 25,000.00 0.00 2021-05-21 2021-05-04 2021-05-26 2021-06-10 2021-07-09 2022-03-08 Equipment and Furniture, and Implementation specialist to provide technical Selection Project Management assistance to the PIU 014/CSIC/HCRP/00/2021 / Technical Assistance, Individual Engagement of an Auditor to Capacity Building, TVET Under IDA / 65560 Post Consultant Open 10,000.00 0.00 2021-05-28 2021-05-26 2021-06-28 2021-07-08 2021-07-25 2021-09-27 conduct an Annual Audit of Equipment and Furniture, and Implementation Selection the finances of the HCRP Project Management 017/CSIC/HCRP/00/2021 / Consultancy to Technical Assistance, Individual develop\implement a Capacity Building, TVET Under IDA / 65560 Post Consultant Open 20,000.00 0.00 2021-05-30 2021-05-26 2021-07-18 2021-08-08 2021-09-12 2022-03-11 National Apprenticeship Equipment and Furniture, and Implementation Selection Programme for TVET in St Project Management Lucia Technical Assistance, 000/CSIC072021 / Individual Capacity Building, TVET Pending Consultancy for the Social IDA / 65560 Post Consultant Open 40,000.00 0.00 2021-06-30 2021-08-18 2021-09-08 2021-10-13 2022-04-11 Equipment and Furniture, and Implementation Information System (ICT) Selection Project Management Page 2 Procurement Plan For Integrated Development for Source Sustainability and Climate Resilient Rain-fed Agriculture Project A World Bank Financed Project Project ID: P165129 [Procurement Plan Period: First 18 months of the Project] Covering the Period: January 2020 to June 2021 Submitted By Project Management Unit [PMU] Himachal Pradesh Forest Department Government of Himachal Pradesh India 2 3 PROCUREMENT PLAN Country: INDIA Borrower: Government of India on behalf of Government of Himachal Pradesh Project Name: Integrated Development for Source Sustainability and Climate Resilient Rain-fed Agriculture Project Project Implementation Agency: Project Management Unit [PMU], Himachal Pradesh Forestry Department [HPFD], Government of Himachal Pradesh Date of General Procurement Notice: December 18, 2019 Bank’s Approval Date of the Procurement Plan: Original … Revision 1: Revision 2: Date of the Procurement Plan: December 2019 Period covered by this Procurement Plan: January 2020 to June 2021 Applicable Procurement Rules. The Procurement of goods, works, consulting and non-consulting services to be financed by the Loan will be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers [dated July 2016; revised November 2017 and August 2018], and the provisions of the Loan Agreement. If there is conflict between government decrees, rules, and regulations and the Bank Procurement Regulations, then Bank’s Procurement Regulations shall prevail. The project will be subject to World Bank Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants [“Anti-Corruption Guidelines”], dated October 15, 2006 and revised in January 2011 and as of July 1, 2016. The project will use the online tool Systematic Tracking of Exchanges in Procurement [STEP] to prepare, clear, and update its procurement plan, for monitoring procurement activities and for communication between the Borrower and the Bank. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under Paragraph 4.4 of the Procurement Regulations are set forth in STEP. Unless otherwise agreed with the World Bank, the World Bank’s Standard Procurement Documents [SPD], Requests for Proposals, and Forms of Consultant Contract will be used. Procurement under national procedures will be carried out based on National Procurement Procedures [NPP] conditions agreed with the Government of India. Procurement estimated at Indian Rupees [INR] 5 Lakhs and above will be submitted through government eProcurement systems provided by NIC 4 www.hptender.gov.in which have been assessed and deemed acceptable by the Bank against Multilateral Development Bank [MDB] requirements. Financial Management [FM] Manual. The FM Manual prepared for the project shall have a separate chapter on Procurement which will provide clear guidance on applicable procurement arrangement, procedures and thresholds, and shall be made available on the project website. Community Operations Manual [COM]. The COM prepared for the project will have clear directives for the community [GPs/individual beneficiaries] with regard to eligible procurement expenditures and agreed procurement arrangements, procedures and thresholds, and shall be made available on the project website. This will serve as a guidebook for procurement, with a view to providing operating instructions and bring in greater transparency and predictability in procurement procedures under the Project. Procurement Arrangements and Profile. Procurement under the Project will be carried out at the central level by the Project Management Unit [PMU] headed by the Chief Project Director [CPD] established for the Project, at the District level by the District Project Officers assisted by the Accounts Assistant at the District Level in each of the 10 District Project Offices [DPOs] located in the Districts covered under the Project [Shimla, Solan, Sirmour, Bilaspur, Hamirpur, Mandi, Kullu, Chamba, Kangra and Una], and by beneficiary GPs [supported by DPOs] at the GP level, in accordance with their approved Gram Panchayat Resource Management Plans [GP-RMP]/MG/OMIF. Officials of the PMU have prior experience of implementing a World Bank financed project and have also undergone training in STEP. GPs will need to be capacitated and provided basic procurement training on applicable procurement procedures and procurement documentation requirements outlined in COM, before initiating their procurements. To meet the readiness requirements of the Department of Economic Affairs [DEA] of the Government of India, the Project has already initiated and awarded contract for critical consultancy package for Environmental and Social Assessment to be retroactively financed by the Bank. The project envisages procurement of low-risk, low-value goods, works and services as below: a. Goods and Non-Consulting Services to be procured under the project are likely to include the following. At State/PMU level, purchase of IT Equipment such laptops, computers, printer, etc., procurement of printing services for IEC, office vehicles, office furniture, etc. are envisaged. At District and GP level, procurement activities will include procurement of Barbed Wire, U/Staple, Tools, Gunny Bags, Vermicompost/ Farm yard Manure, Sand, Seeds, Wooden posts/ poles, Seedlings, Grass tufts, Sign boards/hand prints, seed testing instrument, Seed, Fertilizer, Pesticide, Livestock - Small and Large Ruminants, Agricultural Tools and Implements, equipment, Farm machinery, e.g., power tiller, chaff cutters, pipes, tarpaulins, Medicines, supplements, sprinklers, seedlings, etc. b. Procurement of Minor Civil Works is likely to include the following. At State/ PMU level, procurement of minor civil works will include extension, refurbishment and repair of office buildings, etc. At District and GP level, procurement activities will include procurement of works for construction of Water storage tanks, water channels, vermicompost pits, livestock Mangers, foot bridges, water lifting pumps, GI pipes, accessories, installation of ropeways, Ponds, Check Dams, Subsurface Dykes, Sump Wells etc. and labor contracts for preparing land 5 for nursery, preparing nursery beds, water tank, works of filling gunny bags, sowing of seeds, preparing temporary nursery sheds, watering, hoeing, weeding, , fencing, bush cutting, pit digging, planting seedlings, preparing contour trenches, planting grass tufts, drainage line treatment works, fire management works, allowances and incentives for fire management, Spring development, eradication of exotic weed- lantana, etc. It may be noted that civil works at GP level are demand driven. There are no major civil works contracts envisaged in the project. c. Consultancy Services to be procured under the project are likely to include services for developing a web-based portal for Integrated Financial Management Information System [IFMS], Water Monitoring and Modelling, Value Chain Scoping Studies, Technical Support Study for addressing the needs of Transhumant, M and E, MIS, Baseline Survey, External and Internal Audit, Third Party Verification agent to verify achievement of Disbursement Related Results [DLR]s, need based assessments and studies, individual experts, etc. No consultancy services contracts envisaged at the District/Sub-district levels. The project includes several features of a decentralized, demand-driven project, and activities to be taken up at the community level by selected beneficiaries shall be as per the GP-RMP approved by the PMU of the HP Forestry Department/MG/OMIF. The threshold of procurement activities at community level is expected not to exceed Request for Quotation [RFQ] threshold. Community-level procurement shall follow Community-Driven Development [CDD] arrangements as per the Bank’s Procurement Regulations and as outlined in the Community Operations Manual [COM] currently under preparation. Given other on-going government programs, the activities to be funded following COM shall be identified upfront to avoid double-dipping and will require very close monitoring and oversight. Project Procurement Strategy for Development [PPSD] and Procurement Plan. According to the requirement of the Regulations, a Project Procurement Strategy for Development [PPSD] has been developed, based on which the Procurement Plan for the first 18 months has been prepared. The PPSD describes how procurement in this project will support the Project Development Objective [PDO] and deliver value for money under a risk-based approach. It provides adequate supporting market analysis for the selection methods detailed in the procurement plan. The procurement plan specifies for each contract: [i] a description of the activities/contracts; [ii] selection methods to be applied; [iii] estimated cost; [iv] time schedules; [v] World Bank review requirements; and [vi] any other relevant procurement information. PMU shall submit to the World Bank, for its review and approval, any updates of the procurement plan approved by the World Bank. The project will use Systematic Tracking of Exchanges in Procurement [STEP] system for all its procurement activities carried out at the PMU [Centre] and District levels. Summary from PPSD. The project is preparing its Procurement Strategy document. As per the draft document, the project’s total value is US $100 million of which procurement spend is approximately 80 %. Extensive market analysis has been carried out for procurement packages and decisions on packages are made to ensure adequate participation of bidders. Consultancy contracts are framed based on market research and packaging decided in terms of scope of services and period. Based on the need assessment, the project has decided to 6 use Government e Marketplace [GeM]1 for procurement of Goods up to US $100,000 and as mentioned under the paragraph in the Procurement Plan on National Procurement Procedures. Procurement Capacity Building. Though project staff has past experience of implementing World Bank financed HP Mid-Himalayan Watershed Development Project [HPMHWDP] governed by the Bank’s Procurement Guidelines, however, they need to be exposed to the Procurement Regulations applicable to the Project. HP Forestry Department will be sending key procurement staff of PMU and DPOs to the Indian Institute of Management [IIM], Lucknow or the Administrative Staff College of India [ASCI], Hyderabad from time to time to attend procurement training on World Bank Procurement Framework [PF] applicable to the project. Presently, project staff from PMU and two DPOs will be attending the two-week residential training program on World Bank Procurement Regulations conducted at ASCI, Hyderabad in February 2020. These officials will subsequently provide training to other project staffs prior to implementation of the procurement activities in the project. The PMU/DPOs/APOs will also provide basic procurement training to GPs/Beneficiaries once the Gram Panchayat Resource Management Plan [GP-RMP] is approved by DPO/PMU, and before commencing implementation of GP-RMP. The project officials can also avail of the free Massive Open Online Course on public procurement www.procurementlearning.org offered by the Bank to build their capacity. The Bank had already conducted one training on STEP for PMU officials and will organize STEP training again on need basis for the concerned DPOs staff in near future. Procurement Planning. For each contract to be financed by the Loan, the different procurement methods or consultant selection methods to be used, the need for pre-qualification, estimated costs, prior review requirements, and time frame will be reflected in the Procurement Plan to be agreed between the Borrower and the Bank team. The Procurement Plan will be uploaded in STEP by PMU/DPOs and the approved procurement plan will be disclosed on the project website and Bank’s external website. The procurement plan for the first 18 months of project implementation and all its updates will be submitted to the Bank through STEP, and will lay out the appropriate, fit for purpose market approach and selection methods for procurement of goods, works, non-consulting and consulting services financed by the Bank. It will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity. eProcurement. Currently, the Himachal Pradesh Forestry Department of the Government of Himachal Pradesh is using e-procurement system for its procurement. However, PMU housed in the Forestry Department will be carrying out procurement using eProcurement for the first time in the project, therefore, their capacity building needs to be done for eProcurement. The project will make use of Government of India’s National Informatics Centre [NIC] platform assessed by the Bank against Multilateral Development Bank [MDB] requirements for procurements estimated at INR 5 Lakhs and above. Advance Contracting with Retroactive Financing. For effective project implementation and start-up, the project has initiated advance contracting of critical consultancies for Preparation of Environmental and Social Framework [ESF] and Project Implementation Plan [PIP], and procurement of small value goods such 1 https://gem.gov.in/ 7 as tools, gunny bags, seeds, IT equipment and accessories, vehicles, etc.] and works [very small value labor contracts for Development of Nurseries [52 nos.] in 26 clusters in 10 Districts covering 428 GPs. The total value of this spend is approximately 1.2 % of the Bank loan. Payment made by PMU/HPFD for these contracts following World Bank procurement procedures during the 12 months prior to the tentative Loan signing date shall be eligible for retroactive financing. Record Keeping. All records pertaining to award of tenders/selection of consultants, including tender notification/advertisement, register pertaining to sale and receipt of bids, bid/proposal opening minutes, bid/technical and financial evaluation reports, comparative statements, Goods, Receipt Note [GRN] and all correspondence pertaining to bid evaluation, communication sent to/with the Bank in the process, bid securities, and approval of invitation/evaluation of bids/proposals would be maintained by the PMU and at DPO/GP level. Contract Management. The PMU, HPFD will be responsible for overall procurement and contract management under the project. At the Centre, procurement staff will be responsible for contract monitoring and supervision of contracts awarded by PMU. At DPO level, contract monitoring and supervision will be done by technical staff at DPOs/APOs level [Agriculture, Animal Husbandry/Engineering staff of technical wing of DPO level and Forest Extension and Social Extension staff at APO level] to ensure timely delivery of quality outputs from the procurement contracts in the project areas. All payments will be made by DPOs for district and sub-district level procurements after receipt of Goods receipt Note [GRN]. Work Completion Certificates, etc. The Integrated Financial Management Information System [IFMIS] being developed under the Project will facilitate monitoring of various procurement activities in terms of physical and financial achievements on a monthly basis. The day to day monitoring of procurement activities will be done by APOs/DPOs at field level which will be updated in the online web-based system at district level and will be reviewed by PMU at the Centre. Complaint Handling Mechanism. A complaint handling mechanism to address procurement-related complaints under the Project will be developed and implemented by the PMU/DPOs to the satisfaction of the Bank. Upon receipt of complaints, immediate action would be initiated to acknowledge the complaint and to redress it within a reasonable timeframe. All complaints will be addressed at levels higher than the level at which the procurement process was undertaken, or the decision was taken. Any complaint received will also be forwarded to the Bank for information, and the Bank would be kept informed after the complaint is redressed. Leased Assets: Not Applicable Procurement of Secondhand Goods: Not Applicable Domestic Preference: The provision of domestic preference will be applied in the evaluation of bids in accordance with Annex VI of the Regulations. Procurement Thresholds and Prior Review Thresholds. The table below describes various procurement methods to be used for activities financed by the Loan. 8 Table 1: Procurement Thresholds Procurement approach and method Thresholds [US$ equivalent] Open International [Goods, IT, and >10 million Non-consulting services] – Request for Bids [RFB] Open National [Goods, IT, and Non- >100,000 and up to 10 million consulting services] – Request for Bids [RFB] National Request for Quotation Up to 100,000 [RFQ] – [Goods/Works/Non- consulting Services] Open International [Works] – >40 million Request for Bids [RFB] Open National [Works] - Request for >100,000 and up to 40 million Bids [RFB] Direct Selection With prior agreement, based on justification Framework Agreement For Goods/Works/Non-consulting services: According to paragraphs 6.57-6.59 of Section VI of the Regulations. For Consulting services: According to paragraph 7.33 of Section VII the Regulations. Force Account In accordance with paragraphs 6.54 and 6.55 of Section VI of the Procurement Regulations, and with prior agreement in Procurement plan with the Bank. Consulting Services [Firms] CQS: As per requirements of paragraphs 7.11 and 7.12 of Section VII of the Regulations. LCS, FBS: in justified cases QCBS, QBS: in all other packages Shortlist of National Consultants Up to 800,000 Procurement prior-review thresholds2. Based on the current procurement risk rating of ‘Moderate’, the World Bank will prior review the following contracts: (a) Works [including turnkey, supply and installation of plant and equipment and PPP]: All contracts more than US $15 million equivalent 2 Determination of whether a contract meets the prior review threshold is based on : (i) the total value of the contract, including all taxes and duties payable under the contract; (ii) a contract whose cost estimate was below the Bank’s prior review threshold is subject to prior review if the price of the lowest evaluated responsive bid (or, in the case of consulting services, the financial offer of the selected firm) exceeds such threshold at the bid evaluation stage; and (iii) in the case of a slice and package arrangement, the prior review threshold is determined based on the aggregate value of individual contracts to be awarded under such arrangement. 9 (b) Goods and Information Technology: All contracts > US $4 million equivalent (c) Non-consulting Services: All contracts > US $4 million equivalent (d) Consulting Services: Firms: All contracts >US $2 million equivalent (e) Consulting Services: Individuals: All contracts > US $400,000 equivalent (f) Direct Selection: The justification of Direct Selection for all contracts The above thresholds are for the initial 18-month implementation period. Based on the procurement performance of the project, these thresholds may be subsequently modified. Even for large-value post review cases, the inputs of the World Bank on technical specifications will be obtained by the project. Irrespective of the thresholds, Terms of Reference shall be prior reviewed by Bank. The prior review thresholds will also be indicated in the Procurement Plan. The Procurement Plan will be subsequently updated annually [or at any other time if required] and will reflect any change in the prior review thresholds. The details of National Procurement Procedures are outlined in the Procurement Plan. Prior review contracts. In the case of contracts subject to prior review, PMU, HPFD/DPOs will seek the World Bank’s no objection before granting/agreeing to: [a] an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; [b] any substantial modification of the scope of Works, goods, IT system; non-consulting services, or consulting services and other significant changes to the terms and conditions of the contract; [c] any variation order or amendment [except in cases of extreme urgency] that, singly or combined with all variation orders or amendments previously issued, increases the original contract amount by more than 15 percent; and [d] the proposed termination of the contract. Complaints received in all prior review cases shall be sent to Bank for review and the response to the complaint in such cases, shall be cleared with the Bank. Complaints with allegations of fraud and corruption, shall be shared with Bank, irrespective of the thresholds. Disclosure of procurement information. The following documents shall be disclosed on the project/state websites: [a] Procurement Plan and its updates; [b] an invitation for bids for procurement of Works, Goods, IT system procurement and non-consulting services; [c] request for expression of interest for selection/hiring of consulting services; [d] contract awards of Works, Goods, IT system procurement and non-consulting services procured following international and national procedures; [e] a list of contracts/purchase orders placed following RFQ [Request for Quotation] procedures on a quarterly basis; [f] a list of contracts following direct contracting [DC] on a quarterly basis; [g] an annual financial and physical progress report of all contracts; and [h] an action taken report on the complaints received on a quarterly basis. The following details shall be sent to the World Bank for publishing on the United Nations Development Business and the World Bank external website: [a] Specific Procurement Notice [i.e., invitation for bids] for procurement of Works, Goods, IT system procurement and non-consulting services using open international procedures; [b] Requests for Expression of Interests above US $800,000; [c] contract award details of all procurement of Works, Goods, IT system procurement and non-consulting services using open international procedure; and [d] a list of contracts/purchase orders placed following DC procedures on a quarterly basis. Further, the implementing agency will also publish on their websites any information required under the provisions of ‘suo moto’ disclosure as specified by the Right to Information Act. 10 National Procurement Procedure Conditions. National competition for the procurement of Works, Goods, IT system procurement and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3–5.5 of Section V of the Regulations and the following provisions: I. Only the model bidding documents for National Competitive Procurement [NCP] agreed with the GOI Task Force [and as amended for time to time], shall be used for bidding. II. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. III. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises or enterprises from any given State. IV. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. V. Government e-Marketplace [GeM] set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations [RFQ] method. VI. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. VII. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. VIII. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. IX. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. X. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social [including sexual exploitation and abuse and gender-based violence], health and safety [“ESHS”] risks and impacts. Oversight and Monitoring by the Bank. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. The Bank may conduct, at any time, Independent Procurement Reviews [IPRs] of all the contracts financed under the loan. High risk procurements, if any, will be identified for increased procurement and contract management support and indicated in the procurement plan. Bank team will provide additional due diligence and independent review of the contract performance of such identified procurements. 11 Procurement Review by the PMU, HPFD. Independent procurement post review [PPR] with reporting requirements and agreed with the Bank [As per Para 4 of Annex II of the Procurement Regulations] will be undertaken for the project for PMU’s own internal due diligence. PMU will hire PPR consultants as per Terms of Reference and reporting requirements agreed with the Bank to conduct PPR of PMU and DPOs on a half yearly basis. Other Special Selection Arrangements/Requirement Procurement by communities will be governed by the procedures outlined in the Community Operations Manual [COM] currently under preparation and in accordance with Paras 6.52 and 6.53 of Section VI of the Regulations. COM will be disclosed on the Project website. Procurement Plan as per STEP Tables: 12 PROCUREMENT India : Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2020-10-20 Revised Plan Date(s): (comma delineated, leave blank if none) 2021-05-27 Project ID: P165129 GPN Date: 2019-12-19 Project Name: Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh Loan / Credit No: IBRD / 90410 D Executing Agency(ies): istrict Project Office, Hamirpur, Himachal Pradesh Forestry Department WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-DPO, HAMIRPUR-176307- CW-RFQ / Development of New Forest Nursery at Kalwal and Khazian under APO Unit Component 1. Sustainable Request for Single Stage - One 2021-03- Barsar. Keeping in view of low IBRD / 90410 Land and Water Resource Post Limited 7,570.00 6,217.92 Completed 2020-07-15 2020-01-04 2020-09-09 2020-02-04 Quotations Envelope 08 value and availability of Management perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, HAMIRPUR-176312- CW-RFQ / Raising of Nursery Component 1. Sustainable Request for Single Stage - One 2021-03- in GP Kalwal & Khazian. Total IBRD / 90410 Land and Water Resource Post Limited 4,612.00 22,051.60 Signed 2020-07-13 2020-02-11 2020-09-07 2020-03-02 Quotations Envelope 06 No. of Plants in Nurseries Management =150000 No. IN-DPO, HAMIRPUR-177115- CW-RFQ / RFQ for Cutting/Removal/Disposal of Component 1. Sustainable Request for Single Stage - One 2021-03- Lantana By (CRS Method) IBRD / 90410 Land and Water Resource Post Limited 36,514.00 30,124.27 Signed 2020-07-12 2021-01-15 2020-09-06 2020-03-02 Quotations Envelope 05 Infestation Exten 140 ha. Management upto50% & 75%.for the Financial Year 2019-20. IN-DPO, HAMIRPUR-177117- CW-RFQ / Development of New Forest Nursery at Badehar under APO Unit Component 1. Sustainable Request for Single Stage - One 2021-03- Hamirpur. Keeping in view of IBRD / 90410 Land and Water Resource Post Limited 1,208.00 998.92 Signed 2020-07-12 2020-01-04 2020-09-06 2020-02-04 Quotations Envelope 05 low value and availability of Management perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, HAMIRPUR-179206- CW-RFQ / Raising of Seedling at Badehar Forest Nursery under APO Unit Component 1. Sustainable Request for Single Stage - One 2021-03- Barsar.Keeping in view of low IBRD / 90410 Land and Water Resource Post Limited 59,329.00 3,691.75 Signed 2020-07-12 2020-02-11 2020-09-06 2020-03-02 Quotations Envelope 05 value and availability of Management perspective bidder, limited market approach was adopted.This does not come under RF. IN-DPO, HAMIRPUR-179308- CW-RFQ / Development of New Forest Nursery at Kalwal Component 1. Sustainable and Khazian under APO Unit Request for Single Stage - One 2021-01- IBRD / 90410 Land and Water Resource Post Limited 8,253.00 5,519.52 Signed 2020-06-30 2020-03-03 2020-08-02 2020-03-13 Barsar. Keeping in view of low Quotations Envelope 29 Management value and availability of perspective bidder, limited market approach was adopted. IN-DPO, HAMIRPUR-179319- CW-RFQ / Raising of plantations in the rainy season of 2020 (1100 plants/ha) . It involves Component 1. Sustainable Request for Single Stage - One 2020-12- multiple contracts.Limited IBRD / 90410 Land and Water Resource Post Limited 77,645.00 34,784.18 Signed 2020-06-18 2020-07-08 2020-09-04 2020-08-06 Quotations Envelope 23 approach is adopted as the Management perspective bidders are available at different locations and also based on value of contract. IN-DPO, HAMIRPUR-179333- CW-RFQ / Contour trenching in plantation area including grass seeding at 48 locations Component 1. Sustainable Request for Single Stage - One 2021-02- in the entire IBRD / 90410 Land and Water Resource Post Limited 91,703.00 92,801.87 Signed 2020-06-22 2020-07-08 2020-08-17 2020-07-29 Quotations Envelope 13 district.Cumulative value of Management this activity involves multiple contracts based on low value and small minor labor works IN-DPO, HAMIRPUR-179337- CW-RFQ / Vegetative Check Component 1. Sustainable Pending Barriers . There will be 10 to Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 58,067.00 0.00 Implementat 2020-06-30 2020-08-19 15 jobs (contract) of 22000 Quotations Envelope 15 Management ion Rmt. for the Financial Year 2020-21. IN-DPO, HAMIRPUR-179364- CW-RFQ / Clearing of Lantana infested upto 25% to 50% 1st Component 1. Sustainable Pending Request for Single Stage - One 2021-05- year. There will be 10 to 15 IBRD / 90410 Land and Water Resource Post Limited 32,546.00 0.00 Implementat 2020-08-20 2020-11-20 Quotations Envelope 06 jobs (contract) of 100 ha. area Management ion in different catchment.for the Financial Year 2020-21. IN-DPO, HAMIRPUR-179418- CW-RFQ / Construction of 11813 ponds (manual excavation) at different Component 1. Sustainable Pending Request for Single Stage - One 2021-04- locations (2 APO units) . The IBRD / 90410 Land and Water Resource Post Limited 105,294.00 0.00 Implementat 2020-09-07 2020-10-27 Quotations Envelope 25 estimated cost of each pond Management ion is approx Rs 76 lakh (105294 $) .It involves Multiple contracts Page 1 IN-DPO, HAMIRPUR-179470- CW-RFQ / Development of Forest Nursery at Khazian under APO Barsar. Keeping in Component 1. Sustainable Under Request for Single Stage - One 2021-02- view of low value and IBRD / 90410 Land and Water Resource Post Limited 11,554.00 0.00 Implementat 2020-06-30 2020-03-03 2020-08-10 Quotations Envelope 06 availability of perspective Management ion bidder, limited market approach was adopted. This does not come under RF. IN-DPO, HAMIRPUR-179516- CW-RFQ / Lantana maintenance from various GPs in APO Unit Barsar 140 ha by CRS method (50 to 75% Component 1. Sustainable Pending Request for Single Stage - One 2021-02- ).Keeping in view of low value IBRD / 90410 Land and Water Resource Post Limited 3,362.00 0.00 Implementat 2020-08-20 2020-09-10 Quotations Envelope 24 and availability of perspective Management ion bidder, limited market approach was adopted. This does not come under RF for yr 2019-20 IN-DPO, HAMIRPUR-179722- CW-RFQ / Next year advance Component 1. Sustainable Request for Single Stage - One 2021-05- works in 400 ha. for the year IBRD / 90410 Land and Water Resource Post Limited 250,448.00 275,872.27 Signed 2020-10-08 2020-07-08 2020-11-27 2020-08-06 Quotations Envelope 26 2021-22. There will be 50- Management 70 jobs. IN-DPO, HAMIRPUR-183964- CW-RFQ / Renovation of Component 1. Sustainable Pending Request for Single Stage - One 2021-03- Water Bouries. There will be IBRD / 90410 Land and Water Resource Post Limited 82,481.00 0.00 Implementat 2020-07-18 2020-09-12 Quotations Envelope 11 15 to 20 jobs(Contract) for Management ion the financial year 2020-21. IN-DPO, HAMIRPUR-183970- CW-RFQ / Raising of Nursery Component 1. Sustainable Pending Request for Single Stage - One 2021-03- at Badehar GP Badehar . Total IBRD / 90410 Land and Water Resource Post Limited 2,561.00 0.00 Implementat 2020-07-18 2020-09-12 Quotations Envelope 11 no. of plants in nursery = Management ion 25000. IN-DPO, HAMIRPUR-179326- CW-RFQ / Raising of plantations in the rainy season of 2020 (800 Component 1. Sustainable plants/ha) . It involves 20 Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 288,684.00 123,913.59 Signed 2020-06-18 2020-07-08 2020-07-03 2020-08-06 Jobs.Limited approach is Quotations Envelope 08 Management adopted as the perspective bidders are available at different locations and also based on value of contract. IN-DPO, HAMIRPUR-179330- CW-RFQ / Raising of plantations in the rainy season of 2020 (400 plants/ha) . It involves 8 Component 1. Sustainable Request for Single Stage - One 2021-02- Jobs.Limited approach is IBRD / 90410 Land and Water Resource Post Limited 166,282.00 50,567.04 Signed 2020-06-18 2020-07-08 2020-07-03 2020-08-06 Quotations Envelope 08 adopted as the perspective Management bidders are available at different locations and also based on value of contract for the year 2020. IN-DPO, HAMIRPUR-216824- Component 1. Sustainable Pending CW-RFQ / Construction of Dry Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 150,690.00 0.00 Implementat 2021-01-30 2021-03-02 Stone Structures under soil & Quotations Envelope 31 Management ion moisture conservation IN-DPO, HAMIRPUR-216942- Component 1. Sustainable Pending CW-RFQ / construction of Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 132,949.00 0.00 Implementat 2021-02-01 2021-03-02 Crate Wire Structures under Quotations Envelope 31 Management ion soil & moisture conservation IN-DPO, HAMIRPUR-216974- CW-RFQ / Construction of Component 1. Sustainable Under Request for Single Stage - One 2021-03- cement concrete Check IBRD / 90410 Land and Water Resource Post Limited 106,760.00 0.00 Implementat 2021-02-01 2021-01-30 2021-03-08 Quotations Envelope 31 Barriers in different catchment Management ion areasf IN-DPO, HAMIRPUR-218814- CW-RFQ / Construction of Component 1. Sustainable Request for Single Stage - One 2021-03- Modern Nursery U-97 Paprol IBRD / 90410 Land and Water Resource Post Limited 68,635.00 24,936.86 Signed 2021-02-15 2021-02-15 2021-03-13 2021-03-15 Quotations Envelope 31 Brahmna Under APO Unit Management Barsar 20-21. IN-DPO, HAMIRPUR-218807- CW-RFQ / Clearing of Lantana infested areas up to (25% to 50%,50% to 75%, 75% to 100%) Component 1. Sustainable Request for Single Stage - One 2021-03- Ist year. There will be IBRD / 90410 Land and Water Resource Post Limited 69,498.30 71,713.23 Signed 2021-02-15 2021-01-27 2021-03-10 2021-02-17 Quotations Envelope 31 approximately 23 jobs of 175 Management Ha. area in different catchment for the financial year 2020-21. IN-DPO, HAMIRPUR-208299- CW-RFQ / Clearing of Lantana infested upto (25% to 50%, Component 1. Sustainable 50%to 75%, 75% to 100% ) 1st Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 45,989.00 46,290.81 Completed 2020-12-13 2020-11-26 2021-02-07 2020-12-17 year. There will be 16 Quotations Envelope 25 Management jobs(contract) of 119Ha. area in different catchment for the Financial year 2020-21 IN-DPO, HAMIRPUR-226433- CW-RFQ / Maintenance of 4 No Nurseries at Kalwal, Component 1. Sustainable Pending Khazian , Badahar & Paplol Request for Single Stage - One 2021-09- IBRD / 90410 Land and Water Resource Post Limited 24,000.00 0.00 Implementat 2021-04-05 2021-04-23 Brahmana (Modern Nursery Quotations Envelope 30 Management ion under APO Barsar and Hamirpur of DPO, IDP Hamirpur. IN-DPO, HAMIRPUR-232667- Component 1. Sustainable Request for Pending CW-RFQ / Raising of Request for Single Stage - One 2022-07- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 63,986.00 0.00 Implementat 2021-10-25 2021-11-26 Seedlings at Kalwal, Badehar Quotations Envelope 31 Management Bank-SPD) ion and Khazian Forest Nursery Page 2 IN-DPO, HAMIRPUR-232669- CW-RFQ / Modern Nursery Component 1. Sustainable Request for Pending development raising and Request for Single Stage - One 2022-07- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 53,977.32 0.00 Implementat 2021-05-25 2021-06-18 maintenance U-97 Paprol Quotations Envelope 20 Management Bank-SPD) ion Brahmna Under APO Unit Barsar 21-22. IN-DPO, HAMIRPUR-232680- CW-RFQ / Contour trenching Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-01- in plantation area including IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 33,974.40 0.00 Implementat 2021-06-06 2021-07-15 Quotations Envelope 11 grass seeding at 48 locations Management Bank-SPD) ion in the entire district. IN-DPO, HAMIRPUR-233142- Component 1. Sustainable Request for Pending CW-RFQ / Construction of Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 9,185.86 0.00 Implementat 2021-06-25 2021-08-03 ponds (manual excavation) at Quotations Envelope 16 Management Bank-SPD) ion different locations IN-DPO, HAMIRPUR-233144- Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-02- CW-RFQ / Construction of IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 40,482.99 0.00 Implementat 2021-07-08 2021-08-18 Quotations Envelope 14 Earthen Check Dam Management Bank-SPD) ion IN-DPO, HAMIRPUR-233146- Component 1. Sustainable Request for Pending CW-RFQ / Vegetative Check Request for Single Stage - One 2022-01- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 600.00 0.00 Implementat 2021-05-25 2021-07-08 Barriers along the drainage Quotations Envelope 04 Management Bank-SPD) ion line IN-DPO, HAMIRPUR-233148- CW-RFQ / Construction of Dry Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-02- Stone check dam Structures IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 44,000.00 0.00 Implementat 2021-07-05 2021-08-11 Quotations Envelope 07 under soil & moisture Management Bank-SPD) ion conservation IN-DPO, HAMIRPUR-233149- Component 1. Sustainable Request for Pending CW-RFQ / construction of Request for Single Stage - One 2022-02- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 93,207.78 0.00 Implementat 2021-07-05 2021-08-30 Crate Wire Structures under Quotations Envelope 26 Management Bank-SPD) ion soil & moisture conservation IN-DPO, HAMIRPUR-233150- Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-01- CW-RFQ / Renovation of IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 65,871.63 0.00 Implementat 2021-05-30 2021-07-25 Quotations Envelope 21 Water Bouries/springs Management Bank-SPD) ion IN-DPO, HAMIRPUR-233151- Component 1. Sustainable Request for Pending CW-RFQ / Maintenance of Request for Single Stage - One 2022-01- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 48,512.33 0.00 Implementat 2021-06-06 2021-07-15 plantations carried out during Quotations Envelope 11 Management Bank-SPD) ion 2020-21 for 490 ha. IN-DPO, HAMIRPUR-233157- CW-RFQ / 1st year Lantana Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- eradication maintenance IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 18,545.72 0.00 Implementat 2021-10-25 2021-12-02 Quotations Envelope 30 works in 294 ha by CRS Management Bank-SPD) ion method IN-DPO, HAMIRPUR-233164- CW-RFQ / 2nd year Lantana Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- eradication maintenance work IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 20,273.27 0.00 Implementat 2021-10-25 2021-12-20 Quotations Envelope 25 for 140 ha by Cut Root Stock Management Bank-SPD) ion method IN-DPO, HAMIRPUR-233168- Component 1. Sustainable Request for Pending CW-RFQ / Construction of Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 81,118.92 0.00 Implementat 2021-07-15 2021-09-09 Tanks, Sump wells, etc for Quotations Envelope 08 Management Bank-SPD) ion water harvesting IN-DPO, HAMIRPUR-235194- Component 1. Sustainable Request for Pending CW-RFQ / Demonstrations Request for Single Stage - One 2022-07- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 4,101.58 0.00 Implementat 2021-11-09 2022-01-04 and Promotion of Climate Quotations Envelope 03 Management Bank-SPD) ion smart agriculture IN-DPO, HAMIRPUR-235198- Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-09- CW-RFQ / Fire Management IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 6,835.97 0.00 Implementat 2022-01-30 2022-03-27 Quotations Envelope 23 and awareness. Management Bank-SPD) ion IN-DPO, HAMIRPUR-235202- Component 2. Improved Request for Pending Request for Single Stage - One 2022-02- CW-RFQ / Primary and IBRD / 90410 Agricultural Productivity and Post Limited Quotations (Non 82,031.64 0.00 Implementat 2021-07-07 2021-09-01 Quotations Envelope 28 Secondary water Distribution. Value Addition Bank-SPD) ion IN-DPO, HAMIRPUR-232672- CW-RFQ / Raising of Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-01- plantations in the rainy IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 73,059.36 0.00 Implementat 2021-06-29 2021-07-22 Quotations Envelope 18 season of 2021 (800 Management Bank-SPD) ion plants/ha model). IN-DPO, HAMIRPUR-233143- CW-RFQ / Construction of Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- cement concrete Check IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 93,000.00 0.00 Implementat 2021-06-15 2021-08-01 Quotations Envelope 20 Barriers in different catchment Management Bank-SPD) ion areas IN-DPO, HAMIRPUR-232678- CW-RFQ / Raising of Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-01- plantations in the rainy IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 48,410.00 0.00 Implementat 2021-06-15 2021-07-09 Quotations Envelope 05 season of 2021 (400 Management Bank-SPD) ion plants/ha model) . IN-DPO, HAMIRPUR-233145- Component 1. Sustainable Request for Pending CW-RFQ / Construction of Request for Single Stage - One 2022-02- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 90,000.00 0.00 Implementat 2021-07-15 2021-08-27 Roof Rain Water Harvesting Quotations Envelope 23 Management Bank-SPD) ion structures (RRWHS) IN-DPO, HAMIRPUR-237512- CW-RFQ / Advance plantation work 400 Plant/ha model Component 1. Sustainable Request for Pending (Fencing ) for 145 Hac. This Request for Single Stage - One 2022-02- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 97,900.00 0.00 Implementat 2021-06-15 2021-08-10 activity involves multiple Quotations Envelope 06 Management Bank-SPD) ion contract at different location of Hamirpur District. Limited market approach is adopted Page 3 IN-DPO, HAMIRPUR-237514- CW-RFQ / Advance plantation work in 800 Plant/ha model Component 1. Sustainable Request for Pending (Fencing ) for 123 Hac. This Request for Single Stage - One 2022-02- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 83,050.00 0.00 Implementat 2021-06-15 2021-08-10 activity involves multiple Quotations Envelope 06 Management Bank-SPD) ion contract at different location of Hamirpur District. Limited market approach is adopted GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-DPO, HAMIRPUR-175972- GO-RFQ / Black Recycled Poly Bags 5' x 9' of 250 Gauge double sealed with six holes Component 1. Sustainable in 2 rows of 3 holes in each in Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 2,021.93 1,860.76 Completed 2020-07-20 2020-01-08 2020-09-14 2020-01-18 2021-03-13 2020-02-20 the lower 2 by 3 portion, Dia. Quotations Envelope Management of hole 3 mm.Keeping in view of low value and availability of perspective bidder, limited market approach was adopted IN-DPO, HAMIRPUR-175979- GO-RFQ / Supply of Forestry Component 1. Sustainable Seeds and cuttings (Amla, Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 2,241.26 2,061.90 Completed 2020-07-22 2020-01-15 2020-09-16 2020-02-04 2021-03-15 2020-03-07 Behra, Kachnaar, Bamboo, Quotations Envelope Management Dehu and Teak cuttings) for the financial year 2019-20 IN-DPO, HAMIRPUR-175982- GO-RFQ / Quotation for Hot- Dripped Galvanized Steel Component 1. Sustainable Request for Single Stage - One Barbed Wire for fencing (ISI IBRD / 90410 Land and Water Resource Post Limited 11,595.92 10,640.19 Completed 2020-07-18 2020-02-24 2020-09-12 2020-03-15 2021-03-11 2020-03-15 Quotations Envelope marked) and U. Nails Staples Management for fencing the Barbed Wire.for the Financial Year 2019-20. IN-DPO, HAMIRPUR-179483- Component 1. Sustainable Pending GO-RFQ / Supply of P.Bags for Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 9,904.00 0.00 Implementati 2020-06-16 2020-08-11 2021-02-07 raising of nursery Qty. 30 qtl. Quotations Envelope Management on for the financial year 2020-21 IN-DPO, HAMIRPUR-179488- GO-RFQ / Raising of Seedling at Kalwal and Khazian Forest Nursery under APO Unit Component 1. Sustainable Pending Barsar.Keeping in view of low Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 2,641.00 0.00 Implementati 2020-06-22 2020-08-17 2021-02-13 value and availability of Quotations Envelope Management on perspective bidder, limited market approach was adopted.This does not come under RF. 2021-22. IN-DPO, HAMIRPUR-218812- Component 2. Improved Pending GO-RFQ / Procurement of IBRD / 90410 Agricultural Productivity and Post Direct Selection Direct 935.00 0.00 Implementati 2021-03-22 2021-03-22 2021-03-25 2021-03-31 wheat seed and fertilizers for Value Addition on demonstration plots IN-DPO, HAMIRPUR-216985- Component 1. Sustainable Pending GO-RFQ / Purchase of Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 4,050.00 0.00 Implementati 2021-02-01 2021-02-18 2021-03-25 Forestry Seeds during 2020- Quotations Envelope Management on 21 IN-DPO, HAMIRPUR-222259- GO-RFQ / Seed, cultivation Component 2. Improved Pending Request for Single Stage - One material and fertilizers for IBRD / 90410 Agricultural Productivity and Post Limited 10,000.00 0.00 Implementati 2021-03-08 2021-03-30 2021-09-26 Quotations Envelope high value crops Value Addition on demonstration plots IN-DPO, HAMIRPUR-233176- GO-RFQ / Purchase of Component 1. Sustainable Pending Request for Single Stage - One Polythene bags and Forestry IBRD / 90410 Land and Water Resource Post Limited 5,000.00 0.00 Implementati 2021-11-06 2021-11-30 2022-03-31 Quotations Envelope seed for raising of nurseries Management on 2021-22 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 4 PROCUREMENT PLAN - Textual Part Project information: Uzbekistan Medium-Size Cities Integrated Urban Development Project (P162929) Project Implementation agency: “State Investment Committee” or “SIC” means the Borrower’s governmental body established pursuant to the Borrower’s Presidential Decree No. УП-4996 “On the Formation of the State Committee of the Republic of Uzbekistan for Investments” dated March 31, 2017 Date of the Procurement Plan: November 7, 2018 Period covered by this Procurement Plan: From November 2018 to November 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Law of Republic of Uzbekistan “On Public Procurement” dated January 25, 2018 such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The Bank’s Anti-Corruption Guidelines and Sanctions Framework shall be incorporated into the national bidding documents by adding a page entitled “Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework”. 2. Contracts with an appropriate allocation of responsibilities, risks, and liabilities between the Borrower and the contractors/suppliers/consultants. 3. Rights for the Bank to review procurement documentation and activities. In accordance with the Procurement Regulations, each bidding document and contract shall include provisions stating the Bank's policy to sanction firms or individuals, found to have engaged in fraud and/or corruption as defined in the Procurement Regulations. In accordance with the Procurement Regulations, each bidding document and contract financed out of the proceeds of the Financing Agreement shall provide that bidders, suppliers, contractors and their subcontractors, agents, personnel, consultants, service providers, or suppliers shall permit the Bank to inspect all accounts, records and other documents relating to the bid submission and performance of the contract and to have said accounts and records audited by auditors appointed by the Bank. Acts intended to materially impede the exercise of the Bank's inspection and audit rights provided for in the Procurement Regulations constitute an obstructive practice as defined in the Regulations. 4. No bids shall be rejected solely because they fall below or exceed the estimated cost. All bids (including in the case when less than two bids are received) shall not be rejected, the procurement process shall not be cancelled, and new bids shall not be solicited without the Bank's prior written concurrence. The Bidding Documents template to be used under “national open competitive procurement arrangements” are subject to prior written concurrence by the Bank. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables. PROCUREMENT Uzbekistan : Medium-Size Cities Integrated Urban Development Project PLAN General Information Country: Uzbekistan Bank’s Approval Date of the Original Procurement Plan: 2019-01-15 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162929 GPN Date: Project Name: Medium-Size Cities Integrated Urban Development Project Loan / Credit No: TF / A7556, IBRD / 89140 State Investment Committee of the Republic of Uzbekistan Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MSC/UZB-C/W/1.6 / Restoration/strengthening and adaptive reuse in Component 1: Improvement accordance to modern energy of Urban Services and Single Stage - One 2020-11- IBRD / 89140 Post Request for Bids Open - National 500,553.00 0.00 Canceled 2020-02-12 2020-02-12 2020-02-17 2020-02-15 2020-03-30 2020-05-14 2020-04-29 2020-09-09 2020-06-03 efficiency norms of the former Enhancement of Public Urban Envelope 30 Kindergarten #17 and Spaces Administrative building at the Chartak city MSC/UZB-C/W/1.6.1 / Restoration/strengthening and adaptive reuse in Component 1: Improvement accordance to modern energy of Urban Services and Single Stage - One 2021-06- IBRD / 89140 Post Request for Bids Open - National 500,553.00 0.00 Canceled 2020-09-09 2020-09-11 2020-09-14 2020-09-11 2020-10-26 2020-08-05 2020-11-18 2020-09-11 2020-12-23 efficiency norms of the former Enhancement of Public Urban Envelope 21 Kindergarten #17 and Spaces Administrative building at the Chartak city MSC/UZB-C/W/1.6.2 / Restoration/strengthening and adaptive reuse in Component 1: Improvement accordance to modern energy of Urban Services and Single Stage - One 2021-06- IBRD / 89140 Post Request for Bids Open - National 500,553.00 459,525.50 Signed 2020-09-11 2020-07-04 2020-09-16 2020-10-28 2020-08-05 2020-11-27 2020-08-28 2021-01-01 2020-10-05 efficiency norms of the former Enhancement of Public Urban Envelope 30 Kindergarten #17 and Spaces Administrative building at the Chartak city. MSC-CKY/W/2.1 / Component 2: Institutional Construction / Repair of Single Stage - One 2021-08- IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 340,000.00 0.00 Canceled 2020-10-23 2020-11-24 2020-11-02 2020-11-24 2020-12-14 2020-12-24 2021-01-13 2021-01-21 2021-02-17 Garage Premises for Municipal Envelope 16 Building Equipment in the Chartak city MSC-CKY/W/2.2 / Component 2: Institutional Construction / Repair of Single Stage - One 2021-08- IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 300,000.00 0.00 Canceled 2020-10-23 2020-11-24 2020-10-28 2020-11-24 2020-12-09 2020-12-24 2021-01-08 2021-01-21 2021-02-12 Garage Premises for Municipal Envelope 11 Building Equipment in the Kagan city MSC-CKY/W/2.3 / Component 2: Institutional Construction / Repair of Single Stage - One 2021-08- IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 330,000.00 0.00 Canceled 2020-10-23 2020-11-24 2020-10-28 2020-11-24 2020-12-09 2020-12-24 2021-01-08 2021-01-21 2021-02-12 Garage Premises for Municipal Envelope 11 Building Equipment in the Yangiyul city MSC-СKY/W/2.1.1 / Construction of garages for Component 2: Institutional Single Stage - One 2021-12- parking and maintenance of IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 340,000.00 332,777.08 Signed 2021-02-11 2021-02-15 2021-02-21 2021-02-16 2021-04-04 2021-03-19 2021-05-04 2021-05-07 2021-06-08 2021-06-09 Envelope 05 special equipment in Chartak, Building Namangan region. MSC-СKY/W/2.2.1 / Construction of garages for Component 2: Institutional Single Stage - One 2021-12- parking and maintenance of IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 300,000.00 300,299.26 Signed 2021-02-11 2021-02-15 2021-02-21 2021-02-16 2021-04-04 2021-03-19 2021-05-04 2021-05-07 2021-06-08 2021-06-14 Envelope 05 special equipment in Kagan, Building Bukhara region. MSC-СKY/W/2.3.1 / Construction of garages for Component 2: Institutional Single Stage - One 2021-12- parking and maintenance of IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 330,000.00 0.00 Canceled 2021-02-11 2021-02-15 2021-02-21 2021-02-16 2021-04-04 2021-03-19 2021-05-04 2021-05-07 2021-06-08 Envelope 05 special equipment in Yangiyul, Building Tashkent region. MSC-C/W/1.4 / Component 1: Improvement Request for Bids - Reconstruction of the existing Under of Urban Services and Single Stage - One Small Works SPD 2022-09- building of the "Old Bazaar" IBRD / 89140 Post Request for Bids Open - National 746,158.55 0.00 Implementat 2021-05-24 2021-05-27 2021-06-01 2021-05-31 2021-07-15 2021-08-16 2021-09-27 Enhancement of Public Urban Envelope (1 envelope 30 located in Chartak city, ion Spaces process) Namangan region MSC-СKY/W/2.3.1.1 / Request for Bids - Construction of garages for Component 2: Institutional Under Single Stage - One Small Works SPD 2022-03- parking and maintenance of IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 330,000.00 0.00 Implementat 2021-05-31 2021-05-31 2021-06-05 2021-05-31 2021-07-17 2021-08-16 2021-09-20 Envelope (1 envelope 19 special equipment in Yangiyul, Building ion process) Tashkent region. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MSC/UZB-G-RFQ/2.1 / Strengthening the material Component 2: Institutional Request for Single Stage - One and technical base of the IBRD / 89140 Strengthening and Capacity Post Open - National 115,000.00 98,087.01 Completed 2020-02-12 2020-02-26 2020-02-27 2020-02-24 2020-04-30 2020-05-14 Quotations Envelope State Committee Tourism Building Development MSC/UZB-G/2.1 / Procurement of Special Component 2: Institutional Single Stage - One equipment for khokimiyats of IBRD / 89140 Strengthening and Capacity Prior Request for Bids Open - International 2,600,000.00 0.00 Canceled 2020-02-28 2020-02-27 2020-02-29 2020-03-05 2020-03-31 2020-05-14 2020-04-30 2020-09-15 2020-06-04 2020-12-01 Envelope Chartak, Kagan and Yangiyul Building cities Page 1 MSC/UZB-G/2.1.1 / Procurement of Special Component 2: Institutional Single Stage - One equipment for khokimiyats of IBRD / 89140 Strengthening and Capacity Prior Request for Bids Open - International 3,330,000.00 3,087,093.00 Signed 2020-09-14 2020-09-16 2020-09-19 2020-09-17 2020-10-31 2020-01-03 2020-11-30 2021-03-04 2021-01-04 2021-03-31 2021-07-03 Envelope Chartak, Kagan and Yangiyul Building cities NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MSCIUDP-CS/QCBS-03-02 / Development of feasibility study,detailed designs and construction supervision, for Component 1: Improvement the upgrading and of Urban Services and Quality And Cost- improvements of three cities TF / A7556 Prior Open - International 1,235,000.00 1,028,000.00 Signed 2018-10-04 2018-10-08 2018-11-21 2019-03-28 2018-12-19 2019-01-18 2019-05-02 2019-02-22 2019-09-11 2019-03-29 2019-11-08 2020-03-28 Enhancement of Public Urban Based Selection of Uzbekistan. The first Lump- Spaces Sum contract to be financed by ECAPDEV Grant and Second and Third contracts by IBRD Loans. UDP-CS/CQS-5 / Consultant Component 1: Improvement Consultant Firm for Environmental and of Urban Services and TF / A7556 Post Qualification Open - International 25,000.00 0.00 Canceled 2019-01-23 2018-08-06 2019-02-13 2019-03-29 2019-04-28 2019-06-02 2019-11-29 Social Safeguards, including Enhancement of Public Urban Selection training and RPF Spaces Component 1: Improvement UDP-CS/CQS-6 / M&E Consultant of Urban Services and surveys (beneficiary TF / A7556 Post Qualification Open - International 19,000.00 0.00 Canceled 2019-01-23 2018-11-15 2019-02-13 2019-03-29 2019-04-28 2019-01-17 2019-06-02 2019-11-29 Enhancement of Public Urban satisfaction survey) Selection Spaces Component 1: Improvement Consultant UDP-CS/CQS-04 / Grant of Urban Services and TF / A7556 Post Qualification Open - International 6,000.00 0.00 Canceled 2019-01-30 2019-02-20 2019-04-05 2019-05-05 2019-06-09 2019-12-06 Audit Enhancement of Public Urban Selection Spaces UDP-CS/CQS-01 / Preparation of detailed Component 1: Improvement designs DDs and Bidding Consultant of Urban Services and Documents, and construction IBRD / 89140 Post Qualification Open - International 80,000.00 80,000.00 Signed 2019-03-06 2019-03-05 2019-03-08 2019-03-25 2019-03-20 2019-03-28 2019-04-05 2019-04-01 2019-04-09 2019-09-30 Enhancement of Public Urban supervision. For the Phase 1 - Selection Spaces US $ 30 000 Lump Sum, Phase 2 - US $ 50 000 Time Based. MSCIUDP-CS/QCBS-05-02 / Development of a National Component 2: Institutional Monitoring and Evaluation Quality And Cost- IBRD / 89140 Strengthening and Capacity Post Open - International 270,000.00 0.00 Canceled 2019-09-27 2019-10-18 2019-12-01 2019-12-29 2020-01-28 2020-03-03 2020-04-07 2021-04-07 (M&E) system for the Based Selection Building sustainable Tourism & Travel sector in Uzbekistan MSCIUDP-CS/QCBS-06-01 / Analysis and Assessment of Component 2: Institutional the Financing of Urban Quality And Cost- IBRD / 89140 Strengthening and Capacity Prior Open - International 1,000,000.00 0.00 Canceled 2019-09-27 2019-10-18 2019-12-01 2019-12-29 2020-01-28 2020-03-03 2020-04-07 2021-04-07 Development and Based Selection Building Intergovernmental Fiscal Relations in Uzbekistan MSCIUDP-CS/QCBS-05-01 / Development of new susainable tourism destinations, including Component 2: Institutional Quality And Cost- Pending promotion, marketing & IBRD / 89140 Strengthening and Capacity Post Open - International 480,000.00 0.00 2019-11-05 2019-11-26 2020-01-09 2020-02-06 2020-03-07 2020-04-11 2020-05-16 2021-05-16 Based Selection Implementation branding strategy and action Building plan, for (i) the Fergana Valley and (ii) Bukhara Region in Uzbekistan MSC-PA/3.1 / Consultant for Component 3: Least Cost IBRD / 89140 Post Open - International 70,000.00 29,500.00 Signed 2020-06-19 2020-06-24 2020-07-10 2020-07-29 2020-08-23 2020-12-21 2020-09-20 2021-01-22 2020-10-20 2021-04-14 2020-11-24 2021-05-05 2020-12-29 2021-05-10 2021-06-27 Audit Implementation Support Selection MSC-CKY/CS/1.1 / Preparation of Detailed Design Component 1: Improvement and Bidding Documents, and of Urban Services and Quality And Cost- Under IBRD / 89140 Prior Open - International 2,200,000.00 0.00 2020-06-26 2020-06-30 2020-07-17 2020-08-27 2020-08-30 2021-01-08 2020-09-27 2021-02-11 2020-10-27 2021-06-17 2020-12-01 2021-01-05 2022-01-05 Construction Supervision for Enhancement of Public Urban Based Selection Implementation integrated urban upgrading in Spaces the three pilot cities. MSC-MA/3.2 / Project Monitoring and Evaluation Component 3: Fixed Budget IBRD / 89140 Post Open - International 80,000.00 79,700.00 Signed 2020-06-29 2020-09-11 2020-07-20 2020-09-11 2020-09-02 2021-02-01 2020-09-30 2021-03-09 2020-10-30 2021-04-14 2020-12-04 2021-05-05 2021-01-08 2021-05-10 2022-01-08 Baseline Survey and Implementation Support Selection Beneficiary Satisfaction MSC-CS/2.3 / Advisory Services to State Committee Component 2: Institutional Quality And Cost- Under on Tourism Development on IBRD / 89140 Strengthening and Capacity Prior Open - International 800,000.00 0.00 2020-06-29 2020-06-30 2020-07-20 2020-08-31 2020-09-02 2021-02-11 2020-09-30 2021-03-17 2020-10-30 2020-12-04 2021-01-08 2022-01-08 Based Selection Implementation developing comprehensive Building strategy MSCIUDP-CS/QCBS-04-01 / Detailed Design, Bidding Documents, and Supervision Component 1: Improvement for Restoration and adaptive of Urban Services and Quality And Cost- Under reuse of (i) Emir's Palace; (ii) IBRD / 89140 Prior Open - International 1,300,000.00 0.00 2019-09-30 2020-08-17 2019-10-21 2020-08-31 2019-12-04 2021-05-27 2020-01-01 2020-01-31 2020-03-06 2020-04-10 2021-04-10 Enhancement of Public Urban Based Selection Implementation Italian Hotel; and (iii) Russian Spaces Consulate (Makhalla Committee Building) in Kagan (Bukhara region) Page 2 MSC-CS/2.2 / Analysis and Assessment of the Financing Component 2: Institutional Quality And Cost- Under of Urban Development and IBRD / 89140 Strengthening and Capacity Prior Open - International 1,000,000.00 0.00 2020-12-01 2020-12-02 2020-12-01 2020-12-07 2021-01-19 2021-06-02 2021-02-16 2021-03-18 2021-04-22 2021-05-27 2022-05-27 Based Selection Implementation Intergovernmental Fiscal Building Relations in Uzbekistan INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Improvement UDP-CS/SSS-01 / Feasibility of Urban Services and Studies and detailed designs TF / A7556 Prior Direct Selection Direct 30,000.00 0.00 Under Review 2019-01-23 2019-02-02 2019-04-08 2019-10-05 Enhancement of Public Urban for Year-1 Chartak Eco-trail Spaces MSCIUDP-CS/IND-02/1 / Individual Component 3: Project Implementation Unit TF / A7556 Prior Consultant Open 9,600.00 0.00 Canceled 2019-01-23 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Implementation Support Manager Selection Individual MSCIUDP-CS/IND-02/4 / Component 3: TF / A7556 Post Consultant Open 5,600.00 0.00 Canceled 2019-01-23 2018-08-31 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Sociologist Implementation Support Selection Individual MSCIUDP-CS/IND-02/5 / Component 3: TF / A7556 Post Consultant Open 5,200.00 0.00 Canceled 2019-01-23 2018-09-28 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Ecologist Implementation Support Selection Individual MSCIUDP-CS/IND-02/6 / Component 3: TF / A7556 Post Consultant Open 5,200.00 0.00 Canceled 2019-01-23 2018-09-10 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Engineer Implementation Support Selection MSCIUDP-CS/IND-02/3 / Individual Component 3: Financial management TF / A7556 Post Consultant Open 4,000.00 0.00 Canceled 2019-01-23 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Implementation Support specialist Selection Individual MSCIUDP-CS/IND-02/2 / Component 3: TF / A7556 Post Consultant Open 8,800.00 0.00 Canceled 2019-03-06 2019-04-24 2019-05-15 2019-06-19 2019-12-16 Procurement specialist Implementation Support Selection MSC-C/CS/1.1 / Consulting services for the development Component 1: Improvement of detailed design, bidding of Urban Services and documents and construction IBRD / 89140 Post Direct Selection Direct 425,000.00 0.00 Canceled 2020-03-26 2020-02-03 2020-04-05 2020-02-28 2020-06-09 2021-04-01 Enhancement of Public Urban supervision of the Chartak Eco- Spaces Trail for non-motorized mobility in the city of Chartak MSC-CKY/CS/2.3.1.1 / Advisory Services to Ministry of Construction on Component 2: Institutional Individual modernization of Urban and IBRD / 89140 Strengthening and Capacity Post Consultant Open 132,000.00 0.00 Canceled 2020-06-29 2020-06-29 2020-08-17 2021-01-08 2020-09-07 2020-10-12 2021-04-10 Regional Planning Practices in Building Selection Uzbekistan (phase 1 - international) MSC-CKY/CS/2.3.1.2 / Advisory Services to Ministry Component 2: Institutional Individual of Construction on IBRD / 89140 Strengthening and Capacity Post Consultant Open 21,000.00 16,000.00 Signed 2020-06-29 2020-06-29 2020-08-17 2020-11-25 2020-09-07 2020-12-07 2020-10-12 2021-02-25 2021-04-10 modernization of Urban and Building Selection Regional Planning Practices in Uzbekistan (phase 1 - local) MSC-C/CS/1.1.1 / Consulting services for the development of detailed Component 1: Improvement design, bidding documents of Urban Services and IBRD / 89140 Post Direct Selection Direct 424,900.00 424,900.00 Signed 2020-08-05 2020-08-05 2020-08-05 2020-08-05 2020-08-05 2020-04-22 2021-10-05 and construction supervision Enhancement of Public Urban of the Chartak Eco-Trail for Spaces non-motorized mobility in the city of Chartak MSC-CKY/CS/2.1 / Consultant for Development of Detailed Designs and Bid documents, and Construction Component 2: Institutional Supervision for the IBRD / 89140 Strengthening and Capacity Post Direct Selection Direct 91,600.00 91,600.00 Signed 2020-03-26 2020-04-07 2020-04-05 2020-05-13 2020-06-09 2020-05-15 2020-12-06 Construction / Repair of Building Garage Premises in the cities of Chartak, Kagan and Yangiyul. MSC-CKY/CS/2.3.1.1.1 / Advisory Services to Ministry of Construction on Component 2: Institutional Individual Under modernization of Urban and IBRD / 89140 Strengthening and Capacity Post Consultant Open 132,000.00 0.00 2021-04-12 2021-04-14 2021-05-31 2021-06-21 2021-07-26 2022-01-22 Implementation Regional Planning Practices in Building Selection Uzbekistan (phase 1 - international) Page 3 COMOROS FINANCIAL SECTOR DEVELOPMENT PROJECT (P166193) PLAN DE PASSATION DE MARCHES I. Généralités 1. L'information sur le projet : Pays : UNION DES COMORES Projet : Projet de Développement du Secteur Financier des Comores Numero du crédit : PPA Agence d’exécution : Unité de gestion du Projet BCC 2. Date d’approbation du Plan de passation de marchés par la Banque [original : ......... ; Révision : ... ] 3. Date de notification de l’Avis Général de Passation de marchés : 4. Période couverte par le Plan de Passation de marchés : II-FOURNITURES, TRAVAUX et SERVICES DE NON-CONSULTANT 1. Seuil de Revue préalable : Les seuils requis pour les décisions de passation de marchés sujet aux revues préalables de la Banque sont indiqués par l’APS du pojet Méthode de Passation de Seuil de revue à Commentaires marchés priori Fournitures, Système d’information, et Services autres que les services de consultant 1. AOI >1.500.000$ M>500.000 2. AON Néant M<500.000 3. Cotation Néant M<100.000 4. UNOPS >1.500.000 Travaux 4. AOI >5,000,000 M>3,000,000 5. AON Néant M<3,000,000 6. Demande de dévis Néant M<200,000 7. Entente directe Même que AOI 2. Pré-qualification Les soumissionnaires pour _____________ seront pré- qualifiés selon les dispositions des paragraphes 2.9 et 2.10 des Directives. N/A 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 3.17 des Directives : N/A 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Manuel du projet ……………… à mettre à jour pour le besoin du PPA 5. Tout autre arrangement spécial en passation de marchés : Néant 6. Allotissement de fournitures avec méthodes et calendrier : 1 2 3 4 5 6 7 8 9 Pré- Préféren Revue de Date qualificatio ce la prévue Coût Méthode n nationale Banque Réf. d’ouvertur Commentair Description Contrat estimat de (à priori No e des es if (en $) sélection /à Oui / Non Oui / Non soumissio posterior ns i) F00 Achat de logiciels, 10 000 CF Non Non Post Decembre 1 2018 F00 IT équipement 10 000 CF Non Non Post Decembre 2 2018 F00 Mobilier 10 000 CF Non Non Post Decembre 3 2018 Total 30 000 B-SELECTION DE CONSULTANTS 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans l'Annexe 1 des Directives Sélection et Emploi de consultants : Méthode de sélection Seuil de revue à Commentaires priori 1. Toute méthode confondue pour une >500,000 firme 2. Entente directe pour une firme >500,000 3. Consultation individuelle >200,000 4. Entente directe pour un CI >200,000 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de $ 100 000 par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 2.7 des directives de sélection de consultants. 3. Tout autre arrangement spécial de Sélection de consultants : [y compris passation de marchés anticipée et financement rétroactif, si applicable] : N/A 4. Tâches de consultation avec des méthodes de sélection et calendrier 1 2 3 4 5 6 7 Date prévue Revue de la Coût Méthode de Description des Banque (à Commentair Réf. No. estimatif de soumission missions priori / à es (en $) sélection des posteriori) propositions 1. Travaux de préparation de projet Elaboration du PPSD Post Novembre 45j pour G001 Atelier et consultant 50,000 SED 2018 finaliser Elaboration manuel de Post Novembre G002 procédures 75,000 SED 2018 Atelier+AT G003 Total 1125 000 2. Mise en place de l’Unité de Gestion du Projet G004 Coordonnateur, 25,000 SCI Post Novembre 2018 Spécialiste en SCI Post Novembre G005 passation de 12,000 2018 marchés, Spécialiste Gestion SCI Post Novembre G006 12,000 2018 Financière G007 Comptable, 8,000 SCI Post Novembre 2018 G008 Auditeur Externe 20,000 SCI Post Novembre 2018 Personnel 8,000 SCI Post Novembre G009 2018 Administratif. Spécialiste 15,000 SCI Post Novembre G010 environnemental et 2018 social, Spécialiste en Suivi 8,000 SCI Post Novembre G011 2018 Evaluation, G012 Auditeur Interne 15,000 SCI Post Novembre 2018 SOUS-TOTAL 2 123,000 3. Préparation à la mise en œuvre Mise à jour de Post l’environnement légal et G013 règlementaire 300,000 SQC/SCI 30 Octobre 2018 pour l’implémentation de la SNP Mise en place du Post Decembre G014 CNP 50,000 SCI 2018 Assistance sur la Post gouvernance de Novembre G003 100,000 SCI la SNPSF 2018 AT au SNPSF Mise en place de Post Decembre G015 100,000 SCI l’équipe projet au 2018 sein de la BCC pour la mise en œuvre de l’infrastructure financière G016 Sauvegarde 30,000 SCI Post Decembre 2018 G017 Voyages d’études NA Post Mars 2019 SOUS-TOTAL 3 580.000 TOTAL CONSULTANCE 848.000 4. Coûts opérationnel Revue de la Pré- Description Méthode de Banque Coût estimatif (en $) qualificat Date de Contrat sélection (à priori / à Commentair ion posteriori) e Frais de fonctionneme nt de l’UGP : Location de bureau entretien, Internet, Multiple annonces et 100,000 DC Non Post N/A publications, médias, frais bancaires, consommabl es, ateliers, communicati on. Total 100,000 Acronymes : AOI : Appel d’Offre International AON : Appel d’Offre National DC : Demande de Cotation SCBD : Sélection dans le cadre d’un budget déterminé SED : Sélection par entente directe SFQC : Sélection Fondée sur la Qualité et le Cout SMC : Sélection au « moindre coût» SQC : Sélection fondée sur les qualifications des consultants SCI : Consultant individuel PROCUREMENT Comoros : Comoros Financial Inclusion Project PLAN General Information Country: Comoros Bank’s Approval Date of the Original Procurement Plan: 2019-11-14 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166193 GPN Date: 2020-09-29 Project Name: Comoros Financial Inclusion Project Loan / Credit No: IDA / V2770, IDA / 67070, IDA / D6760 U Executing Agency(ies): nité de gesion du Projet BCC WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KM-UGPBCC-179696-CW- Component 2: Project and RFQ / Travaux d'entretien et Request for Single Stage - One 2020-09- IDA / V2770 Payment Systems Post Limited 2,353.00 2,225.37 Completed 2020-06-27 2020-05-21 2020-08-25 2020-06-16 d'amenagement des toillettes Quotations Envelope 25 Management bureau UGP KM-UGPBCC-189612-CW- Component 1: Increasing RFQ / Petits travaux Request for Single Stage - One 2020-11- IDA / V2770 Access to and Usage of Post Limited 6,353.00 21,766.90 Signed 2020-09-03 2020-09-17 2020-10-09 2020-10-27 d'entretiens, aménagements Quotations Envelope 09 Financial Services et réhabilitations Request for KM-UGPBCC-235547-CW- Component 1: Increasing Quotations - Small Pending RFQ / Travaux d'entretien, Request for Single Stage - One 2021-09- IDA / D6760 Access to and Usage of Post Limited Works 32,220.00 0.00 Implementat 2021-06-01 2021-07-09 Aménagement salle serveur Quotations Envelope 07 Financial Services (Emergency) SPD - ion site secours Competitive GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-UGPBCC-146092-GO- Component 1: Increasing Request for Single Stage - One RFQ / ACHAT DE MATÉRIELS IDA / V2770 Access to and Usage of Post Limited 60,000.00 5,243.42 Completed 2019-11-30 2020-01-27 2020-01-25 2020-01-31 2020-07-23 2020-06-03 Quotations Envelope INFORMATIQUE POUR UGP Financial Services KM-UGPBCC-161733-GO- Component 2: Project and Request for Single Stage - One RFQ / Acquisition du logiciel IDA / V2770 Payment Systems Post Limited 25,000.00 5,208.00 Signed 2020-04-08 2020-03-31 2020-06-03 2020-06-09 2020-11-30 Quotations Envelope comptable Management KM-UGPBCC-145795-GO- Component 2: Project and Request for Single Stage - One RFQ / achat d'un véhicules IDA / V2770 Payment Systems Post Limited 35,000.00 31,849.21 Completed 2020-04-05 2020-03-30 2020-05-31 2020-04-30 2020-11-27 2020-06-08 Quotations Envelope pour le projet Management KM-UGPBCC-146100-GO- Component 2: Project and Request for Single Stage - One RFQ / achat mobilier de IDA / V2770 Payment Systems Post Limited 5,000.00 2,657.98 Signed 2020-05-20 2020-11-25 2020-07-15 2020-11-30 2020-09-13 Quotations Envelope bureau Management KM-UGPBCC-167462-GO- Component 2: Project and Request for RFQ / Acquisition des IDA / V2770 Payment Systems Post 32,000.00 10,769.26 Completed 2020-02-21 2020-04-06 2020-04-01 2020-05-06 2020-08-19 Quotations materiels informatiques Management KM-UGPBCC-179680-GO- RFQ / Acquisition de trois Component 2: Project and Request for Single Stage - One ordinateurs portable ( IDA / V2770 Payment Systems Post Limited 5,700.00 5,973.59 Completed 2020-07-02 2020-07-20 2020-07-28 2020-08-24 2020-08-11 2020-10-14 Quotations Envelope Comptable, Responsable de Management communication, SG BCC) KM-UGPBCC-189593-GO- Component 1: Increasing DIR / Acquisition des IDA / V2770 Access to and Usage of Post Direct Selection Direct 26,824.00 19,278.03 Signed 2020-09-04 2020-09-15 2020-09-09 2020-09-16 2020-09-22 2020-10-07 2020-10-22 matériels et équipements des Financial Services salles serveur KM-UGPBCC-187624-GO- Component 2: Project and RFQ / Acquisition d'une Request for Single Stage - One IDA / V2770 Payment Systems Post Limited 529.41 544.22 Completed 2020-04-22 2020-04-21 2020-05-18 2020-04-29 2020-05-25 2020-07-21 imprimante multifonction noir Quotations Envelope Management et blanc KM-UGPBCC-199778-GO- Component 1: Increasing DIR / Adoption d’un logiciel IDA / 67070 Access to and Usage of Post Direct Selection Direct 500,000.00 219,275.00 Signed 2020-10-26 2020-11-10 2020-10-31 2020-10-14 2020-12-21 2021-03-08 2021-06-19 de supervision bancaire pour Financial Services la surveillance prudentielle KM-UGPBCC-203928-GO- Component 2: Project and Request for Single Stage - One RFQ / Acquisition d'un IDA / V2770 Payment Systems Post Limited 35,000.00 33,687.64 Completed 2020-10-10 2020-10-09 2020-11-10 2020-11-12 2020-11-17 2020-11-30 Quotations Envelope véhicule 4X4 Management KM-UGPBCC-221526-GO- Component 1: Increasing Under RFB / Acquisition d'un Single Stage - One IDA / D6760 Access to and Usage of Prior Request for Bids Open - International 2,000,000.00 0.00 Implementati 2021-03-10 2021-03-19 2021-03-15 2021-03-25 2021-05-17 2021-07-15 2021-08-19 2022-08-14 Système d'information Envelope Financial Services on Bancaire KM-UGPBCC-235552-GO- RFQ / Acquisition, Component 1: Increasing Pending Request for Single Stage - One installations matériels et IDA / D6760 Access to and Usage of Post Limited 72,819.00 0.00 Implementati 2021-05-27 2021-07-05 2021-09-06 Quotations Envelope équipements salle serveur site Financial Services on secours NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 KM-UGPBCC-145411-NC- DIR / Communication / médias pour sensibilisation sur le projet. une plage pleine Component 2: Project and Under du Jeune Afrique sur le IDA / V2770 Payment Systems Post Direct Selection 13,200.00 0.00 Implementati 2019-11-13 2019-11-19 2019-11-13 2019-11-19 2019-11-26 l'inclusion financière et le Management on projet Banque Mondiale dans le cadre de la conférence des bailleurs. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-UGPBCC-146105-CS- Component 2: Project and QCBS / recrutement d'un Quality And Cost- IDA / V2770 Payment Systems Post Open - International 20,000.00 0.00 Canceled 2019-11-20 2019-12-23 2019-11-25 2019-12-26 2019-12-19 2020-01-16 2020-02-15 2020-03-21 2020-04-25 2021-04-25 consultant en sauvegarde Based Selection Management environnementale et sociale KM-UGPBCC-199891-CS- QCBS / Recrutement d’un cabinet pour l’évaluation de la Component 1: Increasing Quality And Cost- situation patrimoniale de la IDA / 67070 Access to and Usage of Post Open - International 80,000.00 0.00 Canceled 2020-10-22 2020-11-05 2020-11-05 2020-12-02 2020-11-26 2020-11-18 2020-12-28 2021-01-11 2021-02-08 2021-02-24 2021-03-26 Based Selection SNPSF en vue de la scission de Financial Services ses activités bancaires et postales KM-UGPBCC-221745-CS- Component 2: Project and QCBS / Recrutement d’un Quality And Cost- IDA / D6760 Payment Systems Post Open - International 5,678.00 0.00 Under Review 2020-08-10 2020-08-10 2020-08-24 2020-09-14 2020-10-14 2020-11-04 2020-12-09 2021-01-06 2022-01-06 cabinet pour l'audit interne du Based Selection Management projet KM-UGPBCC-235682-CS- QCBS / Recrutement d’un Component 1: Increasing consultant pour la conception Quality And Cost- Pending IDA / D6760 Access to and Usage of Post Open - International 100,000.00 0.00 2021-07-05 2021-07-19 2021-08-16 2021-09-15 2021-09-22 2021-10-13 2021-10-18 2022-10-18 et mise en œuvre d’un Based Selection Implementation Financial Services programme d’éducation financière INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-UGPBCC-146115-CS- Component 2: Project and Individual INDV / Coordonnateur de IDA / V2770 Payment Systems Post Consultant Open 25,000.00 7,224.02 Completed 2019-11-19 2020-03-27 2019-11-19 2019-12-16 2019-11-25 2019-12-18 2019-12-02 2020-02-03 2020-12-01 2020-05-31 Projet Management Selection KM-UGPBCC-146116-CS- Component 2: Project and Individual INDV / recrutement du IDA / V2770 Payment Systems Post Consultant Open 18,000.00 4,612.63 Signed 2019-11-19 2019-11-21 2019-11-19 2019-12-16 2019-11-25 2019-12-18 2019-12-02 2020-02-10 2020-12-01 Responsable Passation Marché Management Selection KM-UGPBCC-146127-CS- Component 2: Project and Individual INDV / recrutement du IDA / V2770 Payment Systems Post Consultant Open 18,000.00 0.00 Canceled 2019-11-19 2020-02-25 2019-11-20 2019-12-16 2019-11-25 2019-12-18 2019-12-02 2020-12-01 Responsable Administratif et Management Selection Financier KM-UGPBCC-154512-CS- Component 1: Increasing CDS / Recrutement d'un IDA / V2770 Access to and Usage of Post Direct Selection Direct 40,000.00 29,374.47 Signed 2020-01-20 2020-01-23 2020-01-30 2020-01-30 2020-03-01 2020-02-10 2020-08-28 consultant en sauvegarde Financial Services environnementale et sociale KM-UGPBCC-161714-CS- Component 2: Project and Individual INDV / Recrutement du IDA / V2770 Payment Systems Post Consultant Open 2,895.00 2,800.18 Signed 2020-04-06 2020-03-27 2020-05-25 2020-05-04 2020-06-08 2020-06-01 2020-06-29 2020-06-03 2020-07-09 comptable du projet Management Selection KM-UGPBCC-165220-CS- CDS / Recrutement d'un consultant chargé de faire l'élaboration d'un cahier de Component 1: Increasing charge pour l'acquisition du IDA / V2770 Access to and Usage of Post Direct Selection Direct 65,000.00 61,750.00 Signed 2020-04-13 2020-03-27 2020-04-25 2020-04-06 2020-06-29 2020-04-30 2020-09-27 Système d'Information Financial Services Bancaire et de la mise place d'un SIB et le réseau intezrbancaire KM-UGPBCC-146112-CS- CDS / Préparation du PPSD (plan et stratégie de passation Component 2: Project and du marché) et Plan de IDA / V2770 Payment Systems Post Direct Selection Direct 15,000.00 3,368.10 Signed 2020-03-30 2020-05-13 2020-04-09 2020-05-14 2020-06-07 2020-05-15 2020-07-07 passation des marchés (18 Management premiers mois) et atelier consultant KM-UGPBCC-146107-CS- Component 1: Increasing Individual INDV / elaboration du manuel IDA / V2770 Access to and Usage of Post Consultant Open 20,000.00 0.00 Canceled 2019-11-30 2019-12-17 2020-01-18 2020-02-08 2020-03-14 2020-09-10 de procédure Financial Services Selection KM-UGPBCC-161723-CS- Component 2: Project and Individual INDV / Recrutement d'un IDA / V2770 Payment Systems Post Consultant Open 2,475.00 0.00 Canceled 2020-04-06 2020-03-31 2020-05-02 2020-05-07 2020-05-26 2020-07-25 assitant de direction Management Selection KM-UGPBCC-168875-CS- CDS / Recrutement d'un bureau en charge d’assister la Banque Centrale des Comores Component 1: Increasing (BCC) dans l’acquisition d’une IDA / V2770 Access to and Usage of Post Direct Selection Direct 130,000.00 100,000.00 Signed 2020-04-22 2020-04-23 2020-04-27 2020-04-23 2020-06-01 2020-05-27 2020-07-31 connectivité réseau pour le Financial Services Système National des Paiements et d’un Système Bancaire de Base pour la BCC KM-UGPBCC-179292-CS- INDV / Responsable chargé de Component 2: Project and Individual la communication, et de IDA / V2770 Payment Systems Post Consultant Open 4,940.17 3,386.26 Signed 2020-06-19 2020-06-29 2020-07-15 2020-08-24 2020-07-20 2020-08-26 2020-08-03 2020-09-04 2020-10-31 sauvegardes Management Selection Environnementale et Sociale. Page 2 KM-UGPBCC-165323-CS- Component 2: Project and Individual QCBS / Elaboration du manuel IDA / V2770 Payment Systems Post Consultant Open 20,000.00 0.00 Canceled 2020-04-10 2020-04-23 2020-05-13 2020-05-27 2020-06-10 2020-07-27 de procédure Administratif, Management Selection comptable et Financier KM-UGPBCC-187621-CS- Component 2: Project and CDS / Recrutement du IDA / V2770 Payment Systems Post Direct Selection Direct 6,176.50 7,557.61 Signed 2020-06-04 2020-06-04 2020-06-06 2020-06-08 2020-06-15 2020-06-15 2020-08-29 Coordonnateur National Management remplaçant KM-UGPBCC-189616-CS- Component 2: Project and Individual INDV / Recrutement de IDA / V2770 Payment Systems Post Consultant Open 2,475.00 2,128.95 Signed 2020-08-31 2020-09-09 2020-09-21 2020-11-13 2020-09-25 2020-11-16 2020-10-12 2020-12-01 2020-10-31 l'assistant de direction Management Selection KM-UGPBCC-189619-CS- Component 2: Project and Individual INDV / Recrutement du IDA / V2770 Payment Systems Post Consultant Limited 1,765.00 1,109.75 Signed 2020-08-28 2020-09-09 2020-08-29 2020-12-18 2020-08-31 2020-12-21 2020-09-04 2020-12-22 2020-11-03 Chauffeur / planton Management Selection KM-UGPBCC-203924-CS- Component 2: Project and CDS / Recrutemnt d'un IDA / V2770 Payment Systems Post Direct Selection Direct 15,000.00 0.00 Canceled 2020-11-13 2020-11-19 2020-11-23 2020-12-07 2020-12-18 consultant pour la mise à Management jour du PPSD KM-UGPBCC-203929-CS- Component 2: Project and Individual INDV / Recrutement du IDA / V2770 Payment Systems Post Consultant Open 18,000.00 5,174.57 Signed 2018-10-22 2018-10-23 2018-12-01 2019-12-23 2018-12-08 2019-12-27 2019-01-12 2020-02-03 2019-04-12 Responsable Administratif et Management Selection financier du projet KM-UGPBCC-211064-CS- INDV / Recrutement d'un Component 1: Increasing Individual consultant pour assister la IDA / V2770 Access to and Usage of Post Consultant Limited 1,765.00 2,484.51 Signed 2020-12-28 2021-02-15 2020-12-29 2020-09-25 2021-01-05 2021-02-22 2021-01-09 2021-02-22 2021-01-19 BCC à la réception des travaux Financial Services Selection de réhabilitation de salle serveur KM-UGPBCC-218994-CS- CDS / Recrutement d’un cabinet pour l’évaluation de la Component 1: Increasing situation patrimoniale de la IDA / D6760 Access to and Usage of Post Direct Selection Direct 80,000.00 269,752.50 Signed 2021-01-22 2021-02-17 2021-01-24 2021-01-22 2021-03-03 2021-03-18 2021-04-02 SNPSF en vue de la scission de Financial Services ses activités bancaires et postales KM-UGPBCC-189624-CS-LCS Component 2: Project and Individual / Recrutement de l'auditeur IDA / V2770 Payment Systems Post Consultant Open 5,212.00 0.00 Canceled 2020-10-15 2020-11-24 2020-12-08 2020-12-29 2021-06-27 interne Management Selection KM-UGPBCC-225953-CS- Component 1: Increasing CDS / Recrutement d'un IDA / D6760 Access to and Usage of Post Direct Selection Direct 35,000.00 40,000.00 Signed 2021-03-29 2021-03-24 2021-04-09 2021-03-26 2021-05-31 2021-04-20 2021-07-30 conseiller en resolution Financial Services bancaire KM-UGPBCC-222252-CS- Component 1: Increasing Individual INDV / Recrutement d'un IDA / D6760 Access to and Usage of Post Consultant Open 200,000.00 0.00 Canceled 2021-03-05 2021-03-09 2021-03-31 2021-04-14 2021-04-23 2022-04-22 consiller résident pour la Financial Services Selection DSBR KM-UGPBCC-210576-CS- Component 1: Increasing Individual INDV / Elaboration d'un APS et IDA / V2770 Access to and Usage of Post Consultant Limited 35,294.00 0.00 Canceled 2020-12-24 2020-12-25 2021-01-01 2021-01-08 2021-02-10 APD pour la contruction d'un Financial Services Selection site secours serveur KM-UGPBCC-189584-CS- INDV / Recrutement d'un Component 1: Increasing Individual conseiller permanent auprés IDA / V2770 Access to and Usage of Post Consultant Open 150,000.00 0.00 Canceled 2020-09-07 2020-09-15 2020-10-02 2020-10-26 2020-10-09 2020-10-22 2020-11-21 de la Direction de la Financial Services Selection Surveillance des BEF et de la Règlementation (DSBR) KM-UGPBCC-235681-CS- Component 1: Increasing Individual Pending INDV / Etudes et prestations IDA / D6760 Access to and Usage of Post Consultant Open 7,049.00 0.00 2021-05-31 2021-06-26 2021-07-09 2021-07-14 2021-09-14 Implementation de services/ site secours Financial Services Selection KM-UGPBCC-235687-CS- INDV / Consultant pour appui Component 1: Increasing Individual à l’acquisition du logiciel CBS, Pending IDA / D6760 Access to and Usage of Post Consultant Limited 30,000.00 0.00 2021-05-26 2021-05-27 2021-05-31 2021-06-03 2021-08-03 matériels et autres Implementation Financial Services Selection équipements (évaluation, livraison, installation…etc. ;) KM-UGPBCC-235678-CS- CDS / Consultant pour appui à l’élaboration des Component 1: Increasing Under spécifications techniques IDA / D6760 Access to and Usage of Post Direct Selection Direct 130,000.00 0.00 2021-06-10 2021-06-10 2021-06-13 2021-07-08 2022-01-04 Implementation SAT+ et Soutien à l’équipe Financial Services projet de la BCC pour l’implémentation du CBS KM-UGPBCC-235679-CS- Component 1: Increasing CDS / Dotation et soutien à la Pending IDA / D6760 Access to and Usage of Post Direct Selection Direct 29,809.00 0.00 2021-06-21 2021-07-01 2021-08-09 2022-04-06 maintenance de salle serveur Implementation Financial Services et site secours Page 3 Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412) I. General 1. Bank’s approval Date of the procurement Plan Original: June 2,2016: Revision 3 of Updated Procurement Plan, February 5,2017 2. Date of General Procurement Notice: June 2016 3. Period covered by this procurement plan: The procurement period of project covered, 24 months II. Goods and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Expenditure Contract Value Procurement Contracts Subject to Category (Threshold) Method Prior Review US $ US$ thousand 1.Civil Works Not applicable 2. Goods >600,000 ICB First contract by all entities <600,000 NCB First contract by all entities <100,000 Shopping First contract by all entities Regardless of value Direct Contracting All 2. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 3. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) July 9, 2010 [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 0.2 2 No Post 1st of the NCB contrac (Goods) t for Prior Review III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: 3. Consulting All ToRs and training Services programs to be reviewed by the World Bank’s task team leader (A) Firms >500,000 QCBS, QBS,FBS,LCS, First contract by any process <500,000 CQS, First CQS contract Regardless of value SSS All (B) Individual Up to 200,000 Under Section V (i) First contract Consultants and; (ii) Procurement Specialist regardless of value >200,000 Under Section V All Regardless of value SSS First > 15,000 SSS All July 9, 2010 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 8.5 5 1 Prior/ of number 4 Post of contracts that will be let under QCBS Summary 0.5 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Pakistan : Federally Administered Tribal Areas (FATA) Governance and Policy Program PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2017-03-16 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156412 GPN Date: Project Name: Federally Administered Tribal Areas (FATA) Governance and Policy Program Loan / Credit No: TF / A3301 FATA Governance and Policy Program Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-GPP FATA-10515-GO- Improving public investment RFQ / Procurement of Request for Single Stage - One TF / A3301 management and service Prior Open - National 86,338.00 0.00 Canceled 2017-04-11 2017-06-11 2017-12-08 Motorbikes for Independent Quotations Envelope delivery Monitoring Unit (IMU) PK-GPP FATA-110773-GO- Improving public investment RFQ / Purchase of Solar UPS Request for Single Stage - One TF / A3301 management and service Post Open - National 8,255.00 6,732.79 Completed 2019-05-06 2019-07-01 2019-09-11 2019-12-28 2019-10-02 for extension of RTPS to Quotations Envelope delivery merged areas PK-GPP FATA-110772-GO- Improving public investment RFQ / Procurement of IT Request for Single Stage - One TF / A3301 management and service Post Open - National 7,547.00 8,199.58 Completed 2019-05-05 2019-06-30 2019-09-06 2019-12-27 2019-09-13 Equipment for extension of Quotations Envelope delivery RTPS to merged areas PK-GPP FATA-110769-GO- RFQ / Procurement of Improving public investment Request for Single Stage - One Furniture & Fixture for TF / A3301 management and service Post Open - National 9,852.00 4,245.87 Completed 2019-05-04 2019-06-29 2019-09-06 2019-12-26 2019-09-27 Quotations Envelope extension of RTPS to merged delivery areas PK-GPP FATA-117396-GO- Improving public investment RFQ / Procurement of Five Request for Single Stage - One TF / A3301 management and service Post Open - National 5,800.00 6,011.42 Completed 2019-06-25 2019-08-25 2019-09-11 2020-02-21 2019-09-18 (05) Laptops for P&D Quotations Envelope delivery Department, MAs PK-GPP FATA-121999-GO- RFQ / Purchase of Licenses for Antivirus (60 Users), Improving public investment Pending Integrated Development Request for Single Stage - One TF / A3301 management and service Post Open - National 26,500.00 0.00 Implementati 2019-08-27 2019-10-22 2020-04-19 Environment (IDE) and Google Quotations Envelope delivery on API for GIS Portal for Geo Tagging of Infrastructure Assets PK-GPP FATA-122009-GO- RFQ / Purchase of 2 Nos 360 Improving public investment Pending Request for Single Stage - One Degree Cameras for Geo TF / A3301 management and service Post Open - National 2,500.00 0.00 Implementati 2019-09-03 2019-10-29 2020-04-26 Quotations Envelope Tagging of Infrastructure delivery on Asset PK-GPP FATA-122014-GO- Improving public investment Pending RFQ / Purchase of 9 GPS Request for Single Stage - One TF / A3301 management and service Post Open - National 1,969.00 0.00 Implementati 2019-09-03 2019-10-29 2020-04-26 Devices for Geo Tagging of Quotations Envelope delivery on Infrastructure Asset PK-GPP FATA-126049-GO- RFP / Purchase of 40 Desktop Computers, 08 Heavy Duty Photocopier (All in One), 08 Improving transparency and Laser Fax Machines, 40 Laser Request for Single Stage - One TF / A3301 accountability in the use of Post Open - National 83,125.00 80,145.65 Completed 2019-08-28 2019-10-23 2019-11-05 2020-03-19 2019-11-26 Printers, 08 Scanners with Quotations Envelope public resources ADF and 36 UPS for Desktop PCs under Support to Finance Department for extending IFMIS to Merged Areas PK-GPP FATA-122004-GO- RFQ / Purchase and Improving public investment Pending Installation of 10 Security Request for Single Stage - One TF / A3301 management and service Post Open - National 1,250.00 0.00 Implementati 2019-09-03 2019-10-29 2020-04-26 Cameras for GIS Hub under Quotations Envelope delivery on Geo Tagging of Infrastructure Assets PK-GPP FATA-191897-GO- RFQ / Purchase of IT Improving public investment Request for Single Stage - One Equipment & Peripherals for TF / A3301 management and service Post Open - National 24,458.00 0.00 Canceled 2020-09-13 2020-11-08 2021-05-07 Quotations Envelope P&D Department, Khyber delivery Pakhtunkhwa PK-GPP FATA-197571-GO- Improving transparency and Pending RFQ / Procurement of Five Request for Single Stage - One TF / A3301 accountability in the use of Post Open - National 24,458.00 0.00 Implementati 2020-10-13 2020-12-08 2021-06-06 Desktops for P&D department Quotations Envelope public resources on KPK PK-GPP FATA-206953-GO- RFQ / Purchase of Furniture Improving transparency and Pending Request for Single Stage - One for Finance Department for TF / A3301 accountability in the use of Post Open - National 10,750.00 0.00 Implementati 2020-12-09 2021-02-03 2021-08-02 Quotations Envelope extension of NFIMS to Merged public resources on Areas. PK-GPP FATA-206955-GO- RFQ / Purchase of 8 Air Improving transparency and Pending Request for Single Stage - One conditioners for District F&P TF / A3301 accountability in the use of Post Open - National 4,250.00 0.00 Implementati 2020-12-09 2021-02-03 2021-08-02 Quotations Envelope Offices under NFMIS Concept public resources on Note Page 1 Ensuring effective support for PK-GPP FATA-214741-GO- the coordination of Pending RFQ / Purchase of Desktops Request for Single Stage - One TF / A3301 governance reforms and the Post Open - National 14,000.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 and Printers for Right to Quotations Envelope operational management of on Information Commission the GPP Ensuring effective support for PK-GPP FATA-214754-GO- the coordination of Pending RFQ / Purchase of Photo Request for Single Stage - One TF / A3301 governance reforms and the Post Open - National 10,000.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Copiers for Right to Quotations Envelope operational management of on Information Commission. the GPP Ensuring effective support for PK-GPP FATA-214763-GO- the coordination of Pending RFQ / Purchase of Water Request for Single Stage - One TF / A3301 governance reforms and the Post Open - National 1,150.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Dispenser for Right to Quotations Envelope operational management of on Information Commission. the GPP Ensuring effective support for PK-GPP FATA-214768-GO- the coordination of Pending RFQ / Purchase of UPS/Solar Request for Single Stage - One TF / A3301 governance reforms and the Post Open - National 5,700.00 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 System for Right to Quotations Envelope operational management of on Information Commission. the GPP Ensuring effective support for PK-GPP FATA-214776-GO- the coordination of Pending RFQ / Purchase of Furnitures Request for Single Stage - One TF / A3301 governance reforms and the Post Open - National 9,400.00 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 for Right to Information Quotations Envelope operational management of on Commission. the GPP PK-GPP FATA-214832-GO- Ensuring effective support for RFQ / Printing and Publication the coordination of Pending Request for Single Stage - One of Brochures, Pamphlets, TF / A3301 governance reforms and the Post Open - National 12,500.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Quotations Envelope Reports and Manuals for Right operational management of on to Services Commission. the GPP PK-GPP FATA-217761-GO- RFQ / Improving public investment Pending Establishment/Renovation of Request for Single Stage - One TF / A3301 management and service Post Open - National 7,500.00 0.00 Implementati 2021-02-23 2021-04-20 2021-10-17 3 Nos of divisional offices for Quotations Envelope delivery on Right to Information Commission. PK-GPP FATA-224695-GO- Improving public investment Pending RFQ / Procurement of Video Request for Single Stage - One TF / A3301 management and service Post Open - National 17,500.00 0.00 Implementati 2021-03-31 2021-05-26 2021-11-22 Conference system for Right Quotations Envelope delivery on To Services. PK-GPP FATA-121996-GO- RFB / Purchase of 34 Laptops, 34 Desktop Computers, 24 Improving public investment Single Stage - One Printers and 2 Servers for GEO TF / A3301 management and service Post Request for Bids Open - National 114,813.00 0.00 Canceled 2020-04-20 2020-04-22 2020-06-03 2020-07-03 2020-08-07 2021-02-03 Envelope Tagging of Infrastructure delivery Assets and 08 Laptops for OSU GPP, Merged Areas PK-GPP FATA-226171-GO- RFQ / Purchase of 34 Laptops, Improving public investment Pending 34 Desktop Computers, for Request for Single Stage - One TF / A3301 management and service Post Open - National 94,700.00 0.00 Implementati 2021-04-11 2021-06-06 2021-12-03 GEO Tagging of Infrastructure Quotations Envelope delivery on Assets and 08 Laptops for OSU GPP, Merged Areas PK-GPP FATA-224744-GO- RFQ / Procurement of Improving transparency and Request for Single Stage - One Furniture for Integrated TF / A3301 accountability in the use of Post Open - National 33,515.00 0.00 Canceled 2021-04-03 2021-05-29 2021-11-25 Quotations Envelope Financial Management public resources Information System (FMIS). PK-GPP FATA-222285-GO- RFQ / Procurement of Improving transparency and Request for Single Stage - One Furniture for Capacity Building TF / A3301 accountability in the use of Post Open - National 9,200.00 0.00 Canceled 2021-04-10 2021-06-05 2021-12-02 Quotations Envelope o Drawing & Disbursement public resources Officers(DDOs). PK-GPP FATA-226443-GO- Improving transparency and Pending RFQ / Procurement of Request for Single Stage - One TF / A3301 accountability in the use of Post Open - National 42,715.00 0.00 Implementati 2021-04-05 2021-05-31 2021-11-27 Furniture under the CNs of Quotations Envelope public resources on FMIS and DDO’s training. Improving public investment Pending PK-GPP FATA-228084-GO- Request for Single Stage - One TF / A3301 management and service Post Open - National 21,000.00 0.00 Implementati 2021-04-30 2021-06-25 2021-12-22 RFQ / Purchase of 21 Laptops. Quotations Envelope delivery on Improving public investment Pending PK-GPP FATA-228422-GO- Request for Single Stage - One TF / A3301 management and service Post Open - National 1,875.00 0.00 Implementati 2021-05-08 2021-07-03 2021-12-30 RFQ / Purchase of Stationery. Quotations Envelope delivery on PK-GPP FATA-228421-GO- Improving public investment Pending Request for Single Stage - One RFQ / Printing & Publication of TF / A3301 management and service Post Open - National 3,125.00 0.00 Implementati 2021-05-08 2021-07-03 2021-12-30 Quotations Envelope Publicity Material. delivery on PK-GPP FATA-231458-GO- Improving public investment Pending Request for Single Stage - One RFQ / Purchase of 14 Printers, TF / A3301 management and service Post Open - National 6,157.00 0.00 Implementati 2021-05-01 2021-06-26 2021-12-23 Quotations Envelope 8 WiFi Routers and 7 Scanners delivery on Improving public investment Pending PK-GPP FATA-226178-GO- Request for Single Stage - One TF / A3301 management and service Post Open - National 17,500.00 0.00 Implementati 2021-04-13 2021-06-08 2021-12-05 RFQ / 2 No. of Servers Quotations Envelope delivery on Improving public investment Pending PK-GPP FATA-226174-GO- Request for Single Stage - One TF / A3301 management and service Post Open - National 12,000.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 RFQ / Purchase of 24 Printers Quotations Envelope delivery on PK-GPP FATA-235688-GO- Improving public investment Pending Request for Single Stage - One RFQ / Purchase of Furniture TF / A3301 management and service Post Open - National 60,114.00 0.00 Implementati 2021-06-09 2021-08-04 2022-01-31 Quotations Envelope for 34 District Offices delivery on PK-GPP FATA-235693-GO- Improving public investment Pending Request for Single Stage - One RFQ / Purchase of Office TF / A3301 management and service Post Open - National 37,921.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 Quotations Envelope Equipment for 34 Offices delivery on Page 2 PK-GPP FATA-238205-GO- Improving public investment Pending Request for Single Stage - One RFQ / Purchase of Laptop and TF / A3301 management and service Post Open - National 26,000.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 Quotations Envelope IT Peripherals delivery on PK-GPP FATA-238209-GO- Improving public investment Pending Request for Single Stage - One RFQ / Purchas of Server TF / A3301 management and service Post Open - National 27,860.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 Quotations Envelope Machines and Firewall delivery on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-GPP FATA-110777-NC- RFQ / Printing, Pusblication Improving public investment Pending Request for Single Stage - One and Promotional material for TF / A3301 management and service Post Open - National 9,434.00 0.00 Implementati 2019-06-30 2019-08-25 2020-02-21 Quotations Envelope Extension of RTPS to merged delivery on areas PK-GPP FATA-110778-NC- Improving public investment Pending RFQ / Citizen Perception Request for Single Stage - One TF / A3301 management and service Post Open - National 9,434.00 0.00 Implementati 2020-05-05 2020-06-30 2020-12-27 Survey for extension of RTPS Quotations Envelope delivery on to merged areas CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-GPP FATA-5476-CS-QCBS Improving public investment / Hiring of Firm for Enhancing Quality And Cost- TF / A3301 management and service Post Open - International 1,500,000.00 0.00 Canceled 2017-03-30 2017-04-14 2017-05-06 2017-06-05 2017-06-20 2017-07-10 2017-07-27 2018-07-27 Citizen Engagement using ICT Based Selection delivery Tools PK-GPP FATA-10503-CS- Improving public investment Consultant CQS / Hiring of Firm for TF / A3301 management and service Post Qualification Open - National 500,000.00 0.00 Canceled 2017-03-30 2017-03-30 2017-04-14 2017-04-27 2017-05-29 2017-06-13 2017-07-03 2018-07-03 Strengthening Regulatory delivery Selection Regime of Public Procurement PK-GPP FATA-10504-CS- Improving public investment Consultant CQS / Hiring of Firm for TF / A3301 management and service Post Qualification Open - National 500,000.00 0.00 Canceled 2018-07-01 2018-07-16 2018-08-30 2018-09-14 2018-10-04 2019-10-04 Strengthening Procurement delivery Selection MIS PK-GPP FATA-5475-CS-QCBS Improving public investment / Hiring of Firm for Public Quality And Cost- TF / A3301 management and service Prior Open - International 3,000,000.00 0.00 Canceled 2017-03-30 2017-12-21 2017-04-14 2018-06-29 2017-05-24 2017-06-08 2017-06-18 2017-07-08 2017-08-08 2018-08-08 Investment Management Based Selection delivery Reforms PK-GPP FATA-5468-CS-QCBS Improving transparency and Quality And Cost- / Hiring of Firm for PFM TF / A3301 accountability in the use of Prior Open - International 3,000,000.00 0.00 Canceled 2017-03-30 2017-06-23 2017-04-14 2018-06-14 2017-05-14 2017-06-13 2017-06-28 2017-07-23 2017-08-12 2018-08-12 Based Selection Strengthening public resources PK-GPP FATA-14346-CS-LCS Improving transparency and / Hiring of Firm for provision Least Cost TF / A3301 accountability in the use of Prior Open - National 1,100,000.00 0.00 Canceled 2017-06-01 2017-05-15 2017-06-19 2017-05-16 2017-07-18 2017-08-22 2017-09-06 2017-10-05 2017-10-27 2020-07-05 of Technical Support on IDC Selection public resources basis PK-GPP FATA-7411-CS-CQS Improving public investment Consultant / Establishment of TF / A3301 management and service Post Qualification Open - National 450,000.00 0.00 Canceled 2017-03-30 2017-03-31 2017-04-14 2017-04-27 2017-05-09 2017-05-24 2017-06-13 2017-12-30 Independent Monitoring Unit delivery Selection in FATA Secretariat PK-GPP FATA-224692-CS- LCS / Hiring of FIRM for Improving public investment Consultant Pending proactive disclosure of data TF / A3301 management and service Post Qualification Open - National 31,250.00 0.00 2021-04-02 2021-04-23 2021-05-13 2021-05-20 2021-05-31 2021-08-14 Implementation under Right to Information delivery Selection Commission. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-GPP FATA-10508-CS- Improving public investment CDS / Hiring of Firm for PFM TF / A3301 management and service Prior Direct Selection Direct 500,000.00 0.00 Canceled 2017-03-25 2017-03-27 2017-04-04 2017-04-03 2017-06-08 2018-06-08 Certification Program delivery PK-GPP FATA-22289-CS- Improving public investment Individual INDV / Hiring of Reforms TF / A3301 management and service Post Consultant Open 171,000.00 36,089.16 Terminated 2017-07-31 2017-08-09 2017-09-03 2017-08-09 2017-09-18 2017-10-13 2017-08-15 2020-06-24 Advisor delivery Selection Ensuring effective support for the coordination of Individual PK-GPP FATA-31397-CS- TF / A3301 governance reforms and the Prior Consultant Open 152,000.00 0.00 Canceled 2017-10-12 2017-11-28 2017-12-01 2018-08-27 2017-12-22 2018-01-20 2020-06-30 INDV / Coordinator OSU operational management of Selection the GPP Ensuring effective support for PK-GPP FATA-31399-CS- the coordination of Individual INDV / Financial Management TF / A3301 governance reforms and the Prior Consultant Open 121,500.00 0.00 Canceled 2017-10-13 2017-11-28 2017-12-02 2017-12-23 2018-08-01 2018-01-21 2020-06-30 Specialist OSU operational management of Selection the GPP PK-GPP FATA-31400-CS- Improving transparency and Individual INDV / Procurement Officer TF / A3301 accountability in the use of Post Consultant Open 30,500.00 0.00 Canceled 2017-10-12 2017-12-01 2017-12-22 2018-01-20 2020-06-30 Component 1 public resources Selection PK-GPP FATA-31401-CS- Improving transparency and Individual INDV / Finance Officer TF / A3301 accountability in the use of Post Consultant Open 30,500.00 0.00 Canceled 2017-10-12 2017-12-01 2017-12-22 2018-01-20 2020-06-30 Component 1 public resources Selection Page 3 PK-GPP FATA-31404-CS- Improving public investment Individual INDV / Procurement Officer TF / A3301 management and service Post Consultant Open 30,500.00 0.00 Canceled 2017-10-12 2017-12-01 2017-12-22 2018-01-20 2020-06-30 Component 2 delivery Selection PK-GPP FATA-31406-CS- Improving public investment Individual INDV / Finance Officer TF / A3301 management and service Post Consultant Open 30,500.00 0.00 Canceled 2017-10-12 2017-12-01 2017-12-22 2018-01-20 2020-06-30 Component 2 delivery Selection Ensuring effective support for PK-GPP FATA-34021-CS- the coordination of Individual INDV / Procurement Specialist TF / A3301 governance reforms and the Prior Consultant Open 107,000.00 0.00 Canceled 2017-12-22 2018-01-24 2018-01-27 2018-02-05 2020-08-26 for OSU operational management of Selection the GPP Ensuring effective support for PK-GPP FATA-71817-CS- the coordination of Individual INDV / Coordinator OSU - TF / A3301 governance reforms and the Post Consultant Open 152,000.00 36,133.68 Terminated 2018-07-27 2018-02-09 2018-09-15 2018-08-27 2018-10-06 2018-09-03 2018-11-04 2018-09-05 2021-04-14 Post Review operational management of Selection the GPP PK-GPP FATA-126047-CS- Improving public investment Individual INDV / Hiring of GIS Analyst TF / A3301 management and service Post Consultant Open 43,875.00 0.00 Canceled 2019-08-22 2020-05-24 2020-05-27 2020-06-05 2021-06-04 for GEO Tagging of Public delivery Selection Infrastructure PK-GPP FATA-216081-CS- INDV / Hiring of Expert/ Improving public investment Individual Analyst for Appraisal of Pending TF / A3301 management and service Post Consultant Open 7,500.00 0.00 2021-01-28 2021-03-18 2021-04-08 2021-05-13 2021-11-09 Merged Areas ADP Schemes Implementation delivery Selection /PC-I under M&E Concept Note PK-GPP FATA-224750-CS- Improving public investment Individual INDV / Hiring of Consultant Pending TF / A3301 management and service Post Consultant Limited 2,500.00 0.00 2021-03-22 2021-03-27 2021-04-17 2021-05-22 2021-11-18 to developed and integrate Implementation delivery Selection appraisal module in to DPMIS. PK-GPP FATA-224736-CS- INDV / Hiring of Individual Improving transparency and Individual Pending Consultant for IFMIS/SAP TF / A3301 accountability in the use of Post Consultant Limited 30,000.00 0.00 2021-03-22 2021-03-27 2021-04-17 2021-05-22 2022-05-22 Implementation Human Capital Management public resources Selection (HCM). PK-GPP FATA-227733-CS- INDV / Hiring of Focal Person Improving public investment Individual Pending Complaints for Right To TF / A3301 management and service Post Consultant Open 6,000.00 0.00 2021-04-05 2021-05-24 2021-06-14 2021-07-19 2022-01-15 Implementation Information (RTI) Commission delivery Selection at Divisional Office Peshawar PK-GPP FATA-227737-CS- INDV / Hiring of Focal Person Improving public investment Individual Pending Complaints for Right To TF / A3301 management and service Post Consultant Open 6,000.00 0.00 2021-04-05 2021-05-24 2021-06-14 2021-07-19 2022-01-15 Implementation Information (RTI) Commission delivery Selection at Divisional Office Bannu PK-GPP FATA-227738-CS- INDV / Hiring of Focal Person Improving public investment Individual Pending Complaints for Right To TF / A3301 management and service Post Consultant Open 6,000.00 0.00 2021-04-05 2021-05-24 2021-06-14 2021-07-19 2022-01-15 Implementation Information (RTI) Commission delivery Selection at Divisional Office Kohat Page 4 Himachal Pradesh Horticulture Development Project Project ID : P151744 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan : Original: March 22, 2016 2. Date of General Procurement Notice: May 19, 2015 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Table 1: Procurement Methods Category Method of Threshold (US$ Procurement Equivalent) Goods and non- ICB >3,000,000 consulting LIB Wherever agreed by the services (including World Bank IT contracts) NCB Up to 3,000,000 (with NCB conditions) Shopping Up to 100,000 From UN Agencies As per para 3.10 of Guidelines DC As per para 3.7 of Guidelines Force Account As per para 3.9 of Guidelines Framework As per para 3.6 of Guidelines Agreements Works ICB >40,000,000 NCB Up to 40,000,000 (with NCB conditions) Shopping Up to 100,000 DC As per para 3.7 of Guidelines Force Account As per para 3.9 of Guidelines  Prior Review by the Bank : The World Bank will prior review all Terms of Reference and the following contracts: March 22, 2015 • Works: All contracts more than US$15.0 million equivalent; • Goods: All contracts more than US$3.0 million equivalent; • Non-Consulting Services: All contracts more than US$3.0 million equivalent;  The HPHDS will prior review the first contract issued by each implementing entity, if the estimates of those contracts are below the prior review threshold value. The Bank will conduct prior review for only those contracts whose estimates fall in the prior review threshold value. In addition, justifications for all contracts to be issued on Limited International Bidding (LIB), direct contracting or single sourcing (>US$100,000) basis will be subject to prior review by the World Bank. These thresholds are set for the initial 18 months of project implementation and are based on the procurement performance of the project, and may be modified. In addition, the Bank will carry out an annual ex post procurement review of the procurement falling below the prior review threshold mentioned above.  All contracts below the specified prior review threshold value will be subject to Post Procurement Review (PPR). The implementing agency will prepare a list of contracts and submit it to the World Bank for this purpose. The PPR will be conducted on an annual basis. 2. Prequalification. Not applicable 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements:  International Competitive Bidding (ICB) is the preferred method for procurement of goods, works and non-consulting services using the World Bank’s standard bidding document. In addition, the following methods may be adopted depending upon size and complexity of subprojects in accordance with Procurement Guidelines, and as agreed in the Procurement Plan: (a) Limited International Bidding (LIB), (b) National Competitive Bidding (NCB), (c) Shopping, (d) Framework Agreements, (e) Direct Contracting, (f) Force Account, and (g) Procurement of UN agencies. Limited International Bidding is essentially ICB by direct invitation, is used only under exceptional circumstances, and will be March 22, 2015 adopted only for packages that are specifically agreed by the World Bank to be procured following LIB.  National Competitive Bidding (NCB) for procurement of goods and works will be conducted in accordance with paragraphs 3.3 and 3.4 of the Procurement Guidelines and the following provisions: (i) Only the model bidding documents for NCB as agreed with the GoI Task Force (and as amended from time to time), will be used for bidding. (ii) Invitation to bid will be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids. (iii) No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, government-owned enterprises, small-scale enterprises or enterprise from any given regional government; (iv) Except with the prior concurrence of the World Bank, there will be no negotiation of price with the bidders, even with the lowest evaluated bidder; (v) For prior review contracts, extension of bid validity will not be allowed without the prior concurrence of the World Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the World Bank only in cases of Force Majeure and circumstance beyond the control of the Purchaser/Employer); (vi) For prior review contracts, re-bidding will not be carried out without the prior concurrence of the World Bank; (vii) The system of rejecting bids outside a pre-determined margin or “bracket” of prices will not be used in the Project; (viii) Rates contracts entered into by the Directorate General of Supplies and Disposal (DGS & D) will not be acceptable as a substitute for NCB procedures unless agreed with the World Bank on a case-by- case basis. Such contracts will be acceptable however, for any procurement under the shopping procedure; (ix) The two or three envelop system will not be used (expect when using the e-procurement system assessed and agreed by the World Bank). March 22, 2015  Shopping. Procurement of goods, works and non-consulting services may be carried out using the shopping method (paragraph 3.5 of the Procurement Guidelines) for readily available, off-the-shelf products, or simple civil works valued at less than US$100,000 and which do not require tailor made designs as agreed with the World Bank or concerned expert agencies. Such method, if any, will be agreed in the Procurement Plan. The implementing agency and entities will solicit at least three price quotations for the purchase of goods, materials, small works, or services (non-consulting), to formulate a cost comparison report. If agreed by the World Bank, under exceptional circumstances, (such as design sensitivity due to location near a monument or appropriate technology), International Shopping may be used wherein quotations will be solicited from at least three suppliers in two different countries. Goods that otherwise qualify for shopping could be procured directly from UN agencies. In specific cases agreed with the World Bank, procurement may be made from UN agencies as per paragraph 3.10 of the Procurement Guidelines.  Direct Contracting. Direct contracting for the procurement of civil works and goods (paragraph 3.7 of the Procurement Guidelines) may be used to extend an existing contract or award a new contract. For such contracting to be justified, the World Bank must agree that the price is reasonable and that no advantage could be obtained by further competition. Direct contracting can be used to procure from the private sector, UN agencies/programs (for goods), or contractors or NGOs that are already mobilized and working in the target areas.  Force Account. When contractors/suppliers are unlikely to bid at reasonable prices because of the location and risk associated with the subproject or a certain government agency has exclusive rights to a certain type of works/supply, the borrower may use its own department’s personnel and equipment or government owned construction units, provided that the borrower has sufficient managerial capacity and possesses the required technical and financial controls to report to the World Bank on expenditure, as per paragraph 3.9 of the Procurement Guidelines.  Framework Agreements. Directorate General of Supplies and Disposal rate contracts will be acceptable as framework agreements for the procurement of goods. Regional government level rate contracts will be examined by the World Bank and if agreed upon, may also be used as framework agreements. Implementing entities also have the option to set up new framework agreements as per paragraph 3.6 of the Procurement Guidelines. March 22, 2015  Use of government institutions and enterprise. Government owned enterprise or institutions in India may be hired based on their unique and exceptional nature if their participation is considered critical to the Project implementation. In such cases, the conditions given in clauses 1.13 of the Consultant Guidelines will be satisfied and each case will be subject to prior review by the World Bank. 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness : Available in separate Excel file III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Table 2: Procurement Methods Category Method of Threshold (US$ Procurement Equivalent) Consultants’ QCBS As per Section II of Guidelines services CQS Up to 300,000 SSS As per para 3.8-3.11 of Guidelines Individuals As per Section V of Guidelines LCS As per para 3.6 of Guidelines QBS As per para 3.2 of Guidelines FBS As per para 3.5 of Guidelines (i) International >800,000 shortlist Up to 800,000 (ii) Shortlist may comprise national consultants only  The World Bank will prior review all Terms of Reference and the following contracts: • All contracts more than US$1.0 million equivalent for firm; and • All contracts more US$300,000 equivalent for individuals. The HPHDS will prior review the first contract issued by each implementing entity, if the estimates of those contracts are below the March 22, 2015 prior review threshold value. The Bank will conduct prior review for only those contracts whose estimates fall in the prior review threshold value. In addition, justifications for all contracts to be issued on direct contracting or single sourcing (>US$100,000) basis will be subject to prior review by the World Bank. These thresholds are set for the initial 18 months of project implementation and are based on the procurement performance of the project, and may be modified. In addition, the Bank will carry out an annual ex post procurement review of the procurement falling below the prior review threshold mentioned above. All contracts below the specified prior review threshold value will be subject to Post Procurement Review (PPR). The implementing agency will prepare a list of contracts and submit it to the World Bank for this purpose. The PPR will be conducted on an annual basis. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US $ 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements:  Selection of Consultants—Quality and Cost Based Selection: Consultant Services may be procured under contracts awarded on the basis of Quality- and Cost-based Selection in accordance with the provisions of Section II of Consultant Guidelines using the World Bank’s Standard RFP. In addition, the following selection methods may be adopted depending upon size and complexity of tasks and as agreed in the Procurement Plan: • Quality Based Selection (QBS) • Selection under Fixed Budget (FBS) • Least Cost Selection (LCS) • Single Source Selection (SSS) • Individual Consultant (IC) Single-Source Selection of consulting firms or individual experts may be used only if it presents a clear advantage over competition for the required consulting services in accordance with paragraph 3.8 of the World Bank’s Consultant Guidelines. Selection of consulting firms based on Consultants’ Qualifications (CQS) may be appropriate for assignments estimated to cost up to US$300,000 or equivalent in accordance with paragraph 3.7 of the Consultant Guidelines. Advertisement for expression of interest may be limited to the regional level for assignments estimated to cost less than US$100,000. For assignments that are estimated to cost less than US$50,000, March 22, 2015 advertisement is not mandatory as long as a shortlist of at least three proven qualified firms is established. Shortlists of consultants for services estimated to cost less than US$800,000 or the equivalent per contract may be composed entirely of national consultants (paragraph 2.7 of Consultant Guidelines). Services for assignments that meet the requirements set forth in paragraph 5.1 of the Consultant Guidelines may be procured under contracts awarded to individual consultants in accordance with the provisions of paragraphs 5.2 to 5.5 of the Consultant Guidelines. Under the circumstances described in paragraph 5.6 of the Consultant Guidelines, such contracts may be awarded to individual consultants on a sole source basis. 4. Consultancy Assignments with Selection Methods and Time Schedule: Available in separate Excel file. March 22, 2015 PROCUREMENT India : Himachal Pradesh Horticulture Development Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2017-09-12 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151744 GPN Date: 2017-04-03 Project Name: Himachal Pradesh Horticulture Development Project Loan / Credit No: IDA / 58380 D Executing Agency(ies): r Y S Parmar University of Horticulture and Forestry, Nauni, Solan WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned HPHDP PIU UHF WORKS 2 / Providing solar fencing, Component A: Horticulture establishment of metrological Request for Single Stage - One 2018-09- IDA / 58380 Production and Post Open - National 280,000.00 0.00 Canceled 2018-01-20 2018-03-17 observatories, supply and Quotations Envelope 13 Diversification erection of training structure for trees HPHDP PIU UHF WORKS 3 / Construction, Upgradation Component A: Horticulture Single Stage - Two 2018-08- and renovation of IDA / 58380 Production and Post Request for Bids Open - National 510,000.00 0.00 Canceled 2017-09-14 2017-09-19 2017-10-31 2018-01-13 2018-02-17 Envelope 16 Laboratories, sitting space, Diversification renovation of PIU Cell WORKS PACKAGE-2 / Component A: Horticulture Request for Single Stage - One 2019-05- Creating of HP-HDP Cell for IDA / 58380 Production and Post Limited 769.00 0.00 Canceled 2018-10-05 2018-11-30 Quotations Envelope 29 PIU at UH&F,Nauni Diversification WORKS PACKAGE-6 / Component A: Horticulture Request for Single Stage - One 2020-05- Construction of sample IDA / 58380 Production and Post Limited 76,000.00 39,034.94 Signed 2019-10-02 2019-12-23 2019-11-27 2020-05-13 Quotations Envelope 25 digestion facility under HPHDP Diversification IN-UNIVERSITY HORTICULT- 119676-CW-RFQ / Renovation of culture room, Component A: Horticulture Request for Single Stage - One 2020-03- Laboratory and sitting space IDA / 58380 Production and Post Limited 17,457.00 17,246.09 Completed 2019-07-27 2017-06-30 2019-09-21 2017-11-11 Quotations Envelope 19 etc. for the department of Diversification plant pathology at main campus nauni, Solan IN-UNIVERSITY HORTICULT- 119686-CW-RFQ / Renovation/Scaling up of Bio- Component A: Horticulture control unit for the Request for Single Stage - One 2020-03- IDA / 58380 Production and Post Limited 25,169.00 24,761.60 Completed 2019-07-27 2018-02-12 2019-09-21 2018-06-08 department of Entomology at Quotations Envelope 19 Diversification main campus Nauni, Solan. SH: Civil works along with module lab IN-UNIVERSITY HORTICULT- 119701-CW-RFQ / Renovation and strengthening of laboratory and sitting space Component A: Horticulture Request for Single Stage - One 2020-03- for the department of Fruit IDA / 58380 Production and Post Limited 28,810.00 29,429.74 Completed 2019-07-28 2017-08-17 2019-09-22 2017-10-04 Quotations Envelope 20 Science at main campus Diversification Nauni, Solan. SH:Civil work along with module lab WORKS PACKAGE-1 / Supply Component A: Horticulture and erection of training Request for Single Stage - One 2020-04- IDA / 58380 Production and Post Limited 40,000.00 33,859.96 Signed 2019-08-27 2018-05-26 2019-10-22 2018-06-19 structures for training of trees Quotations Envelope 19 Diversification under HPHDP WORKS PACKAGE-3 / Component A: Horticulture Request for Single Stage - One 2020-03- Purchase and installation of IDA / 58380 Production and Post Limited 10,000.00 1,349.89 Signed 2019-08-04 2017-07-24 2019-09-29 2017-08-28 Quotations Envelope 27 Drip Irrigation Facilities Diversification WORKS PACKAGE-8 / Component A: Horticulture Development of culture room Request for Single Stage - One 2020-04- IDA / 58380 Production and Post Limited 20,000.00 0.00 Canceled 2019-09-03 2019-10-29 and humidity maintenance Quotations Envelope 26 Diversification and monitoring system WORKS PACKAGE-7 / Construction of building for Component A: Horticulture Under Single Stage - Two 2020-07- creating facilities for queen IDA / 58380 Production and Post Request for Bids Open - National 230,000.00 116,316.60 Implementat 2019-08-22 2020-06-03 2019-08-27 2020-06-04 2019-10-08 2020-07-07 2019-12-21 2020-09-21 2020-01-25 Envelope 23 production and bumble bee Diversification ion rearing WORKS PACKAGE-5 / Component A: Horticulture Development of water supply Single Stage - Two 2020-08- IDA / 58380 Production and Post Request for Bids Open - National 126,000.00 0.00 Canceled 2019-09-16 2019-09-21 2019-11-02 2020-01-15 2020-02-19 facilities and water harvesting Envelope 17 Diversification structures under HPHDP PACKAGE-19 / Supply and Component A: Horticulture Request for Single Stage - One 2021-08- Installation of Drip Irrigation IDA / 58380 Production and Post Limited 11,000.00 0.00 Canceled 2020-12-20 2021-02-14 Quotations Envelope 13 System for new Fruit Orchards Diversification WORKS PACKAGE-4 / Component A: Horticulture Under Providing Solar Fencing of Request for Single Stage - One 2021-08- IDA / 58380 Production and Post Limited 70,000.00 0.00 Implementat 2020-12-20 2021-05-18 2021-02-14 Experimental Area under Quotations Envelope 13 Diversification ion HPHDP PACKAGE-20 / Creation of Component A: Horticulture Pending Request for Single Stage - One 2021-09- water facilities under new IDA / 58380 Production and Post Limited 27,000.00 0.00 Implementat 2021-01-08 2021-03-05 Quotations Envelope 01 component gene bank Diversification ion PACKAGE -19 / Supply and Component A: Horticulture Request for Under Request for Single Stage - One 2022-01- Installation of Drip Irrigation IDA / 58380 Production and Post Limited Quotations (Non 70,000.00 0.00 Implementat 2021-06-08 2021-05-20 2021-08-03 Quotations Envelope 30 System. Diversification Bank-SPD) ion GOODS Page 1 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HPHDP PIU UHF COM SOFT Component A: Horticulture Request for Single Stage - One PROC / Purchase of Computer IDA / 58380 Production and Post Open - National 110,000.00 18,304.44 Completed 2018-01-06 2018-03-03 2018-03-16 2018-08-30 2018-04-18 Quotations Envelope software Weather Station Diversification GOODS PACKAGE 2 / Component A: Horticulture Request for Single Stage - One Procurement of Silent Gensets IDA / 58380 Production and Post Open - National 85,077.00 11,237.52 Signed 2018-07-12 2018-09-06 2018-12-14 2019-03-05 Quotations Envelope 4 Diversification HPHDP PIU UHF FARM MACH Component A: Horticulture Request for Single Stage - One / Procurement of Farm IDA / 58380 Production and Post Open - National 50,000.00 0.00 Canceled 2017-08-21 2017-10-16 2018-04-14 Quotations Envelope Machineries and Tools Diversification Component A: Horticulture HPHDP PIU UHF GEN PURCH / Request for Single Stage - One IDA / 58380 Production and Post Open - National 80,000.00 0.00 Canceled 2017-09-25 2017-11-20 2018-05-19 Purchase of Generator Quotations Envelope Diversification IN-UNIVERSITY HORTICULT- 61535-GO-RFB / Component A: Horticulture Procurement of Transmission Single Stage - Two IDA / 58380 Production and Post Request for Bids Open - National 770,000.00 0.00 Canceled 2018-07-25 2019-01-02 2018-07-30 2018-09-10 2019-02-05 2018-11-23 2018-12-28 2019-06-26 Electron Microscope and Ultra Envelope Diversification Microtome Upgradable to Cryo with Accessories GOODS PACKAGE-8 / AC-5, Deep Freezer-5, Digital temperature & RH Recorder- 10, Flame Photometer-1, Fume Hoods-1, GPS-9, Hot Component A: Horticulture Request for Single Stage - One Plate-2, Hygrometer-5, IDA / 58380 Production and Post Limited 1,523.00 0.00 Canceled 2018-09-29 2018-11-24 2019-05-23 Quotations Envelope Incubator-cum-shaker-6, Diversification Microwave-2, Mixing machine & trays-1, Media pump with tank, mixer-grinder, pressure tester-1, etc. GOODS PACKAGE-7 / Autoclave-5, BOD Incubator- 9, Centrifuge-2, CHNS Analyzer-1, Canopy Analyzer- Component A: Horticulture 1, CO2 Analyzer, Dehumidifer- Single Stage - Two IDA / 58380 Production and Post Request for Bids Open - National 4,154.00 0.00 Canceled 2018-09-17 2018-09-22 2018-11-03 2019-01-16 2019-02-20 2019-08-19 1, Hot air oven-7, leaf area Envelope Diversification meter-2, Laminar Air Flow-5, Mite brushing and Counting Machine-1, Microcentrifuge-2 etc. GOODS PACKAGE-5 / Procurement of Scientific Equipments (Atomic Absorption Spectrophotometer-1, Component A: Horticulture Deionizer-1, Electrophoresis Single Stage - Two IDA / 58380 Production and Post Request for Bids Open - National 8,615.00 0.00 Canceled 2018-09-17 2018-09-22 2018-11-03 2019-01-16 2019-02-20 2019-08-19 apparatus-2, Fermenter-1, Envelope Diversification Gas Chromatograph-1, Gel Documentation System-1, ICAP-1, KD Pro Thermal Imager-1, LCMS-1, Microwave digestion system-1 etc. GOODS PACKAGE-13 / Component A: Horticulture Request for Single Stage - One Procurement of software and IDA / 58380 Production and Post Limited 308.00 0.00 Canceled 2018-09-22 2018-11-17 2019-05-16 Quotations Envelope software development charges Diversification GOODS PACKAGE 5 / Gel documentation, Inductively Coupled, UV Spectrophotometer, Root Length Scanner, Soil Moisture Component A: Horticulture Single Stage - Two Meter, KD Pro-3, Pressure IDA / 58380 Production and Post Request for Bids Open - National 560,000.00 140,543.45 Signed 2019-09-26 2019-01-02 2019-10-01 2019-11-12 2019-02-14 2020-01-25 2019-07-17 2020-02-29 2019-12-03 2020-08-27 Envelope Plate Apparatus, Diversification Electrophoresis Unit, Spectrometer, Deionizer, Nano Pico drop, Micreowave Digestion System etc. GOODS PACKAGE 7 / Laboratory and Field Equipment (Leaf Area Mater, Plant Canopy Analyzer, Component A: Horticulture Single Stage - Two Laminar Air Flow, BOD IDA / 58380 Production and Post Request for Bids Open - National 270,000.00 93,898.33 Signed 2019-08-23 2019-01-02 2019-08-28 2019-10-09 2019-02-07 2019-12-22 2019-07-03 2020-01-26 2019-08-30 2020-07-24 2019-11-29 Envelope Incubator, Autoclave, Real Diversification Time PCR, Dehumidifier, Hot Air Oven, Centrifuge,CHNS Analyzer etc.) GOODS PACKAGE-4 / Microscopes and Cameras ( Component A: Horticulture Stereozoom , Binocular, Single Stage - Two IDA / 58380 Production and Post Request for Bids Open - National 120,000.00 2,925.19 Signed 2019-09-19 2019-01-02 2019-09-24 2019-11-05 2019-01-29 2020-01-18 2019-02-21 2020-02-22 2019-08-08 2020-08-20 Fluorescent, Phase Contrast Envelope Diversification Microscopes and video & digital cameras) IN-UNIVERSITY HORTICULT- 68678-GO-RFQ / Procurement of computer Component A: Horticulture Request for Single Stage - One systems (Desktops-04, IDA / 58380 Production and Post Open - National 17,290.00 0.00 Canceled 2018-07-12 2018-08-20 2019-02-16 Quotations Envelope Laptops-7, Printer-cum- Diversification Scanner-8, UPS-5, MS Office 2016-11 Nos.) through GeM GOODS PACKAGE-6 / Procurement of Scientific Equipment: GPS, High Precision Weighing, Microwave, Deep Freezer, Component A: Horticulture Refrigerator, Air Conditioner, Request for Single Stage - One IDA / 58380 Production and Post Open - National 99,000.00 24,967.98 Signed 2019-02-16 2019-04-13 2019-11-28 2019-10-10 Vacuum Cleaner, Quotations Envelope Diversification Thermometer, Water Bath, Digital Refractometer, Mixer- cum- Grinder, Hot Plate, Mixing Machine Flame Photometer etc Page 2 IN-UNIVERSITY HORTICULT- 119690-GO-RFQ / Establishment of Soil and and Plant testing laboratories in existing training hall building Component A: Horticulture Request for Single Stage - One for the department of Soil IDA / 58380 Production and Post Limited 57,806.00 56,494.76 Signed 2019-07-28 2017-10-21 2019-09-22 2018-01-08 2020-03-20 Quotations Envelope Science and Water Diversification Management (SSWM) at main campus Nauni, Solan. SH: Civil work along with Module labs GOODS PACKAGE 8 / Farm Component A: Horticulture Machinery ( Tractor with Request for Single Stage - One IDA / 58380 Production and Post Limited 29,200.00 20,894.89 Completed 2019-09-30 2019-06-14 2019-11-25 2019-07-03 2020-05-23 2019-08-08 Accessories, Rotavator, Power Quotations Envelope Diversification Tiller, Power Sprayer) GOODS PACKAGE -11 / Portable Photosynthesis System, Deep Freezers, Vortex Multipurpose, Shaking Water Bath, Hot Air Oven, CHNS Component D: Project Single Stage - Two Analyzer, Orbital Shaker, IDA / 58380 Management, Monitoring and Post Request for Bids Open - National 273,000.00 243,172.14 Signed 2020-01-28 2020-01-20 2020-02-02 2020-03-15 2020-02-17 2020-05-28 2020-07-20 2020-07-02 2020-07-20 2020-12-29 Envelope Centrifuge, Spectronic 20D, Learning GPS, Elisa Plate Reader, Fluorescent microscope, Mite Brushing & Counting Machine, etc PACKAGE-14(TEM-GOODS) / Component A: Horticulture Procurement of Transmission Single Stage - Two IDA / 58380 Production and Post Request for Bids Open - National 700,000.00 0.00 Canceled 2020-07-30 2020-09-04 2020-08-04 2020-10-07 2020-09-15 2020-11-12 2020-11-28 2021-01-02 2021-07-01 Electron Microscope under Envelope Diversification component A1.7e PACKAGE-15 ( ULTRAMICROTOME-GOODS) / Component A: Horticulture Single Stage - Two Procurement of IDA / 58380 Production and Post Request for Bids Open - National 169,500.00 0.00 Canceled 2020-07-30 2020-09-04 2020-08-04 2020-10-07 2020-09-15 2020-11-12 2020-11-28 2021-01-02 2021-07-01 Envelope Ultramicrotome under Diversification Component A1.7e PACKAGE-16 / Procurement Component A: Horticulture Pending of Farm Tool Under Gene Bank Request for Single Stage - One IDA / 58380 Production and Post Limited 12,000.00 0.00 Implementati 2020-12-12 2021-02-06 2021-08-05 and other components (need Quotations Envelope Diversification on based) Component A: Horticulture Pending PACKAGE-17 / Procurement Request for Single Stage - One IDA / 58380 Production and Post Limited 3,500.00 0.00 Implementati 2020-12-11 2021-02-05 2021-08-04 of Minor Farm Tools Quotations Envelope Diversification on PACKAGE-18 / Procurement Component A: Horticulture Pending Request for Single Stage - One of Various Scientific IDA / 58380 Production and Post Limited 60,000.00 0.00 Implementati 2020-12-11 2021-02-05 2021-08-04 Quotations Envelope Equipments under HPHDP Diversification on PACKAGE-14(RETENDER) TEM- GOODS / Procurement of Component A: Horticulture Under Single Stage - Two Transmission Electron IDA / 58380 Production and Post Request for Bids Open - National 700,000.00 0.00 Implementati 2021-02-01 2021-02-03 2021-02-06 2021-03-20 2021-03-06 2021-06-02 2021-07-07 2022-01-03 Envelope Microscope under component Diversification on A1.7e PACKAGE-15 (RETENDER) ULTRA MICROTOME / Component A: Horticulture Under Single Stage - Two Procurement of Ultra IDA / 58380 Production and Post Request for Bids Open - National 169,500.00 0.00 Implementati 2021-02-01 2021-02-03 2021-02-06 2021-03-20 2021-03-06 2021-06-02 2021-07-07 2022-01-03 Envelope microtome under component Diversification on A1.7e NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON-CONSULTING SERVICE Component A: Horticulture PACKAGE-1 / Engagement of Single Stage - Two IDA / 58380 Production and Post Request for Bids Open - National 140,000.00 0.00 Canceled 2019-03-11 2019-03-16 2019-04-27 2019-07-10 2019-08-14 2020-02-10 Contractual Labourers (Labour Envelope Diversification Agency) HPHDP PIU UHF NON Component A: Horticulture CONSUL / Engagement of Request for Single Stage - Two IDA / 58380 Production and Post Open - National 780,000.00 0.00 Canceled 2017-10-12 2017-10-17 2017-11-28 2018-02-10 2018-03-17 2018-09-13 Contractual Labourers Labour Proposals Envelope Diversification Agency CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HPHDP PIU UHF CONSULTANCY / Consultancy Component A: Horticulture Quality And Cost- services for providing IDA / 58380 Production and Post Open - International 320,000.00 0.00 Canceled 2019-09-25 2019-10-16 2019-11-29 2019-12-27 2020-01-26 2020-03-01 2020-04-05 2021-04-05 Based Selection international best practices Diversification for rearing of bumble bees INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTANCY PACKAGE-3 / Component A: Horticulture Individual Hiring of individual consultant IDA / 58380 Production and Post Consultant Open 72,000.00 0.00 Canceled 2019-01-31 2019-03-21 2019-04-11 2019-05-16 2019-11-12 services of Senior Reserch Diversification Selection Fellows CONSULTANT PACKAGE-2 / Component A: Horticulture Individual Hiring of individual consultant IDA / 58380 Production and Post Consultant Open 13,000.00 0.00 Canceled 2019-01-31 2019-03-21 2019-04-11 2019-05-16 2019-11-12 services of Research Associate Diversification Selection Page 3 CONSULTANT PACKAGE-4 / Hiring of individual consultant services of Technical Component A: Horticulture Individual Assistants, Field Assistant, IDA / 58380 Production and Post Consultant Open 37,000.00 0.00 Canceled 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2019-11-27 Trained Pruners, Farm Tool Diversification Selection Operators, Technicians, Bee Keeper, Data Entry Operator etc. Page 4 Procurement Plan for Punjab RWSS (P150520) I. General 1. Bank’s approval Date of the procurement Plan 2012 2. Date of General Procurement Notice: [October 01, 2014 ] 3. Period covered by this procurement plan: January 2020 onwards II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as per the Procurement Risk Rating of the Project: 2. Procurement Method Prior Review Threshold US$ 1. ICB and LIB (Goods) Above US$ 2M 2. NCB (Goods) Above US$ 1M 3. ICB (Works) Above US$ 40 million 4. NCB (Works) Above US$ 10 million 5. (Non-Consultant Services) Above US$ 1M 2. Prequalification for Bidders _Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P150520 5. Any Other Special Procurement Arrangements: In addition, the justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold 1. Competitive Methods (Firms) Above US$ 1M 2. Single Source (Firms) Above US$ 500,000 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT India : Punjab Rural Water and Sanitation Sector Improvement Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2018-08-29 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150520 GPN Date: Project Name: Punjab Rural Water and Sanitation Sector Improvement Project Loan / Credit No: IBRD / 84870 Division Pathankot (EE- 2nd) Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DWSS-W-DIV83-5317-1 / W/S Scheme Bamial and Village Anial Block Bamial Inclusive Household Water Request for Single Stage - One 2018-07- District Pathankot:- Providing, IBRD / 84870 Post Open - National 12,700.00 11,259.45 Completed 2018-07-13 2018-07-13 2016-12-23 and Sanitation Services Quotations Envelope 13 laying, fixing, Pipe Line And Water Connection under component 2B PRWSS-S-DIV83-5452-1 / Renovation of rooms for new Je sections (S125 to S133) under jurisdiction of Division Strengthening Institutions Request for Single Stage - One 2019-05- Pathankot EE-2nd including IBRD / 84870 Post Open - National 2,230.00 2,078.67 Signed 2018-09-08 2018-11-03 2018-11-19 and Project Management Quotations Envelope 02 white washing repair of room fixing electric fans and lights e.t.c under component 4A of PRWSSIP DWSS-W-DIV83-6233-1 / WSS Vill Jaini Chack Block Narot Jaimal Singh District Pathanklot: Pkg-2 OHSR, Civil Transformation - Improved Request for Single Stage - One 2020-01- IBRD / 84870 Post Open - National 32,400.00 25,263.78 Signed 2019-04-08 2019-06-03 2019-05-29 Work,Pump Chamber, Livability of Villages Quotations Envelope 29 Pumping Machinery Distribution Pipe Line under component 1A(ii) of PRWSSIP. DWSS-W-DIV83-6505-1 / WSS Chack Amir,Block Bamial, district Pathankot:Providing and Installing of 200mm i/d, Transformation - Improved Request for Single Stage - One 2020-01- IBRD / 84870 Post Open - National 25,000.00 22,208.16 Signed 2019-07-20 2019-10-29 2019-08-16 straight tubewell, upto 125 Livability of Villages Quotations Envelope 27 metres depth with percussion rig under component 1A(ii) of PRWSSIP. DWSS-W-DIV83-6969-1 / WSS Village Saharanpur, Block N.J. Singh, Distt. Pathankot.: Inclusive Household Water Request for Single Stage - One 2020-06- Providing Improved Access to IBRD / 84870 Post Open - National 11,000.00 10,062.63 Signed 2019-10-07 2020-02-12 2020-02-10 2019-11-26 and Sanitation Services Quotations Envelope 09 Water Through Household Connections & Distribution System DWSS-W-DIV83-7165-1 / WSS Village Attepur of Villages Attepur & Bhool chack, Block Sujanpur Distt. Pathankot. Transformation - Improved Request for Single Stage - One 2020-07- IBRD / 84870 Post Open - National 82,100.00 20,263.77 Signed 2019-11-18 2020-03-23 2020-05-18 Providing and installing of Livability of Villages Quotations Envelope 21 200mm i/d straight tubewell, upto 125 mtr depth with percussion rig. DWSS-W-DIV83-7166-1 / WSS Village Jhanjeli , Block Sujanpur Distt. Pathankot. Transformation - Improved Request for Single Stage - One 2020-07- Providing and installing of IBRD / 84870 Post Open - National 67,000.00 20,263.77 Signed 2019-11-18 2020-03-23 2020-05-18 Livability of Villages Quotations Envelope 21 200mm i/d straight tubewell, upto 125 mtr depth with percussion rig. DWSS-W-DIV83-6505-2 / WSS Chack Amir, Block Bamial Distt. Pathankot: Const. of OHSR, Pump Chamber & Transformation - Improved Request for Single Stage - One 2020-12- Pumping machinery, IBRD / 84870 Post Open - National 60,600.00 56,696.37 Signed 2020-02-10 2020-06-15 2020-01-17 Livability of Villages Quotations Envelope 12 Disinfection Unit, Development of Water Works, & Distribution System complete in all respect. DWSS-W-DIV83-8169-1 / WSS Village Bhatoa, Block Narot Jaimal Singh Distt. Pathankot: Providing and Transformation - Improved Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National 24,000.00 22,631.70 Signed 2020-08-31 2021-05-18 2020-10-07 installing of 200mm i/d Livability of Villages Quotations Envelope 15 straight tubewell, upto 125 mtr depth with percussion rig at DWSS-W-DIV83-8280-1 / WSS Majra, Block Narot Jaimal Singh Distt. Pathankot : Transformation - Improved Request for Single Stage - One 2021-09- Providing and installing of IBRD / 84870 Post Open - National 24,000.00 22,697.78 Signed 2020-08-31 2021-05-18 2020-09-16 Livability of Villages Quotations Envelope 15 200mm i/d straight tubewell, upto 125 mtr depth with percussion rig at PRWSS-W-DIV83-8281-1 / WSS Village Manwal, Block Bamial, Distt. Pathankot : Construction of OHSR & Pump Transformation - Improved Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National 56,200.00 54,449.64 Signed 2020-08-31 2021-05-18 2020-10-07 chamber, installation of new Livability of Villages Quotations Envelope 15 machinery, Development of water works & Distribution System Page 1 DWSS-W-DIV83-7165-2 / WSS Village Attepur & Bhool Chack, Block Sujanpur Distt. Pathankot: Construction of Transformation - Improved Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National 56,000.00 56,015.99 Signed 2020-08-31 2021-05-18 2020-10-07 OHSR, Pump Chamber, Livability of Villages Quotations Envelope 15 Development of water works & Distribution System for bifurcation . DWSS-W-DIV83-7166-2 / WSS Village Jhanjeli & Nihalpur, Block Sujanpur Distt. Pathankot: Construction Transformation - Improved Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National 41,500.00 45,764.89 Signed 2020-08-31 2021-05-18 2020-11-05 of OHSR, Pump Chamber, Livability of Villages Quotations Envelope 15 Development of water works & Distribution System for bifurcation PRWSS-S-DIV83-8073-1 / Construction of Office Strengthening Institutions Request for Single Stage - One 2022-07- Building Sub Divisional Office IBRD / 84870 Post Open - National 50,500.00 47,078.13 Signed 2020-10-12 2021-10-07 2020-08-25 and Project Management Quotations Envelope 04 Narot Jaimal Singh, Distt. Pathankot DWSS-W-DIV83-7930-2 / WSS Village Dhesian Ram Colony Block Sujanpur Distt. Under Pathankot.: Construction of Transformation - Improved Request for Single Stage - One 2021-03- IBRD / 84870 Post Open - National 65,700.00 0.00 Implementat 2021-01-13 2021-02-17 OHSR, Pump Chamber, Prov. & Livability of Villages Quotations Envelope 19 ion Installing New Machinery & Distribution Syste at Water supply scheme DWSS-W-DIV83-7930-1 / WSS Village Dhesian Ram Colony Block Sujanpur Distt. Pathankot.Providing and Transformation - Improved Request for Single Stage - One 2021-03- IBRD / 84870 Post Open - National 23,000.00 28,376.03 Signed 2021-01-13 2021-02-24 2021-02-12 installing of 200mm i/d Livability of Villages Quotations Envelope 26 straight tubewell, upto 125 mtr depth with percussion rig at DWSS-W-DIV83-8169-2 / WSS Bhatoa, Block Narot Jaimal Singh Distt. PathankotConstruction of Under Transformation - Improved Request for Single Stage - One 2021-09- OHSR, Pump Chamber, Prov. & IBRD / 84870 Post Open - National 62,500.00 0.00 Implementat 2021-01-13 2021-03-11 Livability of Villages Quotations Envelope 07 insatlling new machinery, ion Development of water works & Distribution system at Water Supply Scheme DWSS-W-DIV83-8280-2 / WSS Village Majra, Block Narot Jaimal Singh Distt. PathankotConstruction of Under Transformation - Improved Request for Single Stage - One 2021-09- OHSR, Pump Chamber, Prov. & IBRD / 84870 Post Open - National 70,000.00 0.00 Implementat 2021-01-13 2021-03-11 Livability of Villages Quotations Envelope 07 insatlling new machinery, ion Development of water works & Distribution system at Water Supply Scheme DWSS-W-DIV83-8419-1 / WSS Village Kotli Jawahar, Block Bamial, Distt. Transformation - Improved Request for Single Stage - One 2021-09- PathankotProviding & IBRD / 84870 Post Open - National 18,000.00 15,094.50 Signed 2021-01-13 2021-03-13 2021-02-12 Livability of Villages Quotations Envelope 09 Installing new tubewell 125 mm id upto 75 mtr depth. at water supply scheme DWSS-W-DIV83-8419-2 / WSS Village Kotli Jawahar, Block Bamial, Distt. Pathankot: Construction of OHSR & Pump Under Transformation - Improved Request for Single Stage - One 2021-09- chamber, installation of new IBRD / 84870 Post Open - National 8,000.00 0.00 Implementat 2021-01-13 2021-03-11 Livability of Villages Quotations Envelope 07 machinery, Development of ion water works & Distribution System at water supply scheme DWSS-W-DIV83-8591-1 / WSS Village Narianpur, Block Narot Jaimal Singh, Distt. Pathankot: Providing and Transformation - Improved Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National 25,000.00 24,059.24 Signed 2021-01-13 2021-03-11 2021-02-12 installing new tubewll 200 Livability of Villages Quotations Envelope 07 mm i/d upto 115 mtr depth with percussion at water supply scheme DWSS-W-DIV83-8591-2 / WSS Village Narianpur, Block Narot Jaimal Singh, Distt. Pathankot: Construction of Under Transformation - Improved Request for Single Stage - One 2021-09- OHSR, pump chamber, Prov. & IBRD / 84870 Post Open - National 86,000.00 0.00 Implementat 2021-01-13 2021-03-11 Livability of Villages Quotations Envelope 07 Installing machinery, ion Development of Water Works & Distribution System at water supply scheme DWSS-W-DIV83-9288-1 / WSS Village Naroli, Block Narot Jaimal Singh Distt. Under Pathankot : Providing and Transformation - Improved Request for Single Stage - One 2021-11- IBRD / 84870 Post Open - National 23,000.00 22,294.44 Implementat 2021-04-20 2021-04-19 2021-05-27 installing new tubewll 200 Livability of Villages Quotations Envelope 23 ion mm i/d upto 100 mtr depth with percussion rig at water supply scheme DWSS-W-DIV83-9288-2 / WSS village Naroli, Block Narot Jaimal Singh Distt. Pathankot, Construction of Under Transformation - Improved Request for Single Stage - One 2021-11- OHSR, Pump Chamber, IBRD / 84870 Post Open - National 70,000.00 0.00 Implementat 2021-04-20 2021-05-27 Livability of Villages Quotations Envelope 23 Providing and installing new ion machinery, Development of water works and distribution syste at water supply scheme Page 2 DWSS-W-DIV83-9592-1 / WSS VILL PHOOL PIARA, BLOCK SUJANPUR, DISTT. National PATHANKOT : PROVIDING Procurement Pending Transformation - Improved Request for Single Stage - One 2021-09- 100% FUNCTIONAL IBRD / 84870 Post Open - National Document - 1 17,000.00 0.00 Implementat 2021-05-23 2021-06-30 Livability of Villages Quotations Envelope 28 HOUSEHOLD TAP Envelope process ion CONNECTIONS (FHTC) TO (2 (Non Bank-SPD) NOS.) HABITATIONS PHOOL PIARA AND ASSA BANO GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PRWSS-G-DIV83-5450-1 / Procurement of Office furniture, Electric fans tools and plants and other facilities Strengthening Institutions Request for Single Stage - One for New JE sections (S125 to IBRD / 84870 Post Open - National 4,450.00 4,152.41 Signed 2018-09-08 2018-11-03 2018-11-19 2019-05-02 and Project Management Quotations Envelope S133) under jurisdiction of Division PathankotEE-2nd under Component 4 A of PRWSSIP NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: negotiations May, 2019. 2. Date of General Procurement Notice: to be published in Aug 2020 3. Period covered by this procurement plan: The procurement period of project covered from year July 2020 to Jun 2021, no procurements have commenced as yet. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement for Moderate Risk Projects: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) US$ 4 million All 2. NCB (Goods) US$ 4 million All 3. ICB (Works) US$ 15 million All 4. NCB (Works) US$ 15 million All 5. (Non-Consultant Services) US$ 4 million All 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Operations Manual has been prepared and procurement is a component of it. Arrangements for local government component have been given in detail. 4. Any Other Special Procurement Arrangements: Not Applicable 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness The main contracts identified so far for the three implementing entities are provided in the annex below. There are no large ICBs of Works or Goods; only some consultancies are beyond the national firms thresholds, and some non consultancy contracts of ETD. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2 m 2. Single Source (Firms) Above US $ 2 m Justification alongwith identification of SSS in procurement plan 3. Individual Above US$ 400, 000 In addition the selection of procurement staff 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the OPCS guidance. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule: There are a number of activities for consultancy contracts. The procurement activity table is annexed which indicted the identified activities. Procurement Activities Estimat Sr. Risk Bank Procureme Evaluation ed Cost Selection No Activity Catego oversig nt selection USD method . ry ht Approach method 000s Project Implementation Unit Office - Local Government Department Annual performanc QCBS e Substant QCBS Firms Highest 1 assessment 1,230 ial Prior Selection internation ranked al of Local Councils Environme nt and Social QCBS Moderat QCBS Firms Highest 2 Safeguard 4,920 e Prior Selection internation ranked s al consultanc y Project Implementation Unit Office - Excise and Taxation Department Disaster Lowest Substant 1 recovery 5,100 ial Prior RFB ICB IT evaluated site responsive Consultanc y for QCBS Modera QCBS Firms Highest 2 software 5,000 te Prior Selection internation ranked developme al nt 14,000 RFB non Lowest Property 5-7 Moderat Single stage 3 survey e post one envelope consultanc evaluated package y responsive s 10,000 Single stage Lowest IT 2-3 Substanti 4 hardware al Prior one envelope RFB evaluated package responsive s Consulting firm for QCBS Substanti QCBS Firms Highest 5 developing 1,680 al Prior Selection internation ranked ICT al strategy Project Implementation Unit Office - Sindh Investment Department Estimat Sr. Risk Bank Procureme Evaluation ed Cost Selection No Activity Catego oversig nt selection USD method . ry ht Approach method 000s Consultanc y for QCBS Substant QCBS Firms Highest 1 bussiness 5,250 ial Prior Selection internation ranked process al mapping Automatio QCBS n of Substant QCBS Firms Highest 2 business 6,000 ial Prior Selection internation ranked al processes Sindh Solid Waste Management Board (to be executed by LGD) Baseline QCBS study for Moderat QCBS Firms Highest 1 landfill 2,000 e Prior Selection internation ranked al sites Study for mapping QCBS Moderat QCBS Firms Highest 2 of 2,100 e Prior Selection internation ranked collection al systems Review of QCBS informal Substant QCBS Firms Highest 3 sector for 1,500 ial Prior Selection internation ranked al recycling PROCUREMENT Pakistan : Competitive and Livable City of Karachi Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2020-08-21 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161402 GPN Date: Project Name: Competitive and Livable City of Karachi Project Loan / Credit No: IBRD / 89980 Local Government Department, Sindh Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-LGD -187684-CW-RFQ / Performance-based Grants to UPGRADATION, RENOVATION Request for Single Stage - One 2021-04- IBRD / 89980 Local Councils and Capacity Post Limited 100,000.00 97,012.25 Signed 2020-08-11 2020-02-20 2020-10-06 2020-03-18 AND REDESIGNING FOR Quotations Envelope 04 Building OFFICE PK-LGD -237541-CW-RFQ / Performance-based Grants to Request for Pending Upgradation, Renovation And Request for Single Stage - One 2021-11- IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-06-08 2021-08-03 Redesigning For DMC South Quotations Envelope 01 Building Bank-SPD) ion Office PK-LGD -237728-CW-RFQ / Performance-based Grants to Request for Pending Upgradation, Renovation And Request for Single Stage - One 2021-11- IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-06-09 2021-08-04 Redesigning For DMC Central Quotations Envelope 02 Building Bank-SPD) ion Office PK-LGD -237795-CW-RFQ / Performance-based Grants to Request for Pending Upgradation, Renovation And Request for Single Stage - One 2021-11- IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-06-09 2021-08-04 Redesigning For DMC East Quotations Envelope 02 Building Bank-SPD) ion Office PK-LGD -237874-CW-RFQ / Performance-based Grants to Request for Pending Upgradation, Renovation And Request for Single Stage - One 2021-11- IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-06-09 2021-08-04 Redesigning For DMC West Quotations Envelope 02 Building Bank-SPD) ion Office PK-LGD -237882-CW-RFQ / Performance-based Grants to Request for Pending Upgradation, Renovation And Request for Single Stage - One 2021-11- IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-06-09 2021-08-04 Redesigning For DMC Malir Quotations Envelope 02 Building Bank-SPD) ion Office PK-LGD -237906-CW-RFQ / Performance-based Grants to Request for Pending Upgradation, Renovation And Request for Single Stage - One 2021-11- IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-06-09 2021-08-04 Redesigning For DMC Korangi Quotations Envelope 02 Building Bank-SPD) ion Office PK-LGD -237915-CW-RFQ / Performance-based Grants to Request for Pending Upgradation, Renovation and Request for Single Stage - One 2021-11- IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-06-09 2021-08-04 Redesigning for District Quotations Envelope 02 Building Bank-SPD) ion Council Office PK-LGD -237922-CW-RFQ / Performance-based Grants to Request for Pending Request for Single Stage - One 2021-11- Upgradation, Renovation And IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 50,000.00 0.00 Implementat 2021-06-09 2021-08-04 Quotations Envelope 02 Redesigning For KMC Office Building Bank-SPD) ion PK-LGD -237925-CW-RFQ / Performance-based Grants to Request for Pending Request for Single Stage - One 2021-11- Repair & rehabilitation of IBRD / 89980 Local Councils and Capacity Post Limited Quotations (Non 90,000.00 0.00 Implementat 2021-06-09 2021-08-04 Quotations Envelope 02 washrooms at KMC building Building Bank-SPD) ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Performance-based Grants to Under PK-LGD -187687-GO-RFQ / Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 25,000.00 0.00 Implementati 2020-08-11 2020-08-24 2020-10-06 2021-04-04 Power Generator for PIU Quotations Envelope Building on PK-LGD -187603-GO-RFQ / IT Equipment for PIU (Computer Equipments Performance-based Grants to (Laptops, Desktops, Laser Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 70,000.00 62,025.57 Signed 2020-08-11 2020-05-07 2020-10-06 2020-06-08 2021-01-04 Printers, Multimedia Quotations Envelope Building Equipment, Camera Cartridges, Photocopier and Softwares)) Performance-based Grants to PK-LGD -187629-GO-RFQ / Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 70,000.00 68,841.78 Signed 2020-08-11 2020-04-01 2020-10-06 2020-04-24 2021-04-04 Furniture and Fixture for PIU Quotations Envelope Building PK-LGD -187677-GO-RFQ / Performance-based Grants to Office Appliances, Machinery Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 35,000.00 35,811.48 Signed 2020-08-11 2020-05-07 2020-10-06 2020-06-08 2020-12-05 and Communication System Quotations Envelope Building for PIU Performance-based Grants to PK-LGD -187683-GO-RFQ / Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 3,500.00 2,386.22 Signed 2020-08-11 2020-04-21 2020-10-06 2020-05-30 2021-04-04 Motorbikes for PIU Quotations Envelope Building Performance-based Grants to Pending PK-LGD -187682-GO-RFQ / Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 90,000.00 0.00 Implementati 2020-08-11 2020-10-06 2021-04-04 Office Vehicles for PIU Quotations Envelope Building on PK-LGD -227730-GO-RFQ / Procurement of Additional IT Performance-based Grants to Pending Equipment for PIU (Computer Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 75,000.00 0.00 Implementati 2021-05-30 2021-07-25 2021-10-23 Equipments (Laptops, Quotations Envelope Building on Desktops, Laser Printers, Multimedia Equipment) Page 1 PK-LGD -237546-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of Furniture and IBRD / 89980 Local Councils and Capacity Post Limited 50,000.00 0.00 Implementati 2021-06-08 2021-08-03 2021-11-01 Quotations Envelope Fixture for DMC South office Building on PK-LGD -237549-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of IT Equipment IBRD / 89980 Local Councils and Capacity Post Limited 30,000.00 0.00 Implementati 2021-06-08 2021-08-03 2021-10-02 Quotations Envelope for DMC South Office Building on PK-LGD -237551-GO-RFQ / Performance-based Grants to Pending Procurement of Office Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 20,000.00 0.00 Implementati 2021-06-08 2021-08-03 2021-10-02 Appliances and Machinery For Quotations Envelope Building on DMC South PK-LGD -237732-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of Furniture and IBRD / 89980 Local Councils and Capacity Post Limited 50,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-11-02 Quotations Envelope Fixture for DMC Central office Building on PK-LGD -237746-GO-RFQ / Performance-based Grants to Request for Single Stage - One Procurement of IT Equipment IBRD / 89980 Local Councils and Capacity Post Limited 30,000.00 24,700.73 Signed 2021-06-09 2020-10-22 2021-08-04 2020-11-18 2021-10-03 Quotations Envelope for DMC Central Office Building PK-LGD -237785-GO-RFQ / Performance-based Grants to Pending Procurement of Office Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 20,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-10-03 Appliances and Machinery for Quotations Envelope Building on DMC Central office PK-LGD -237796-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of Furniture and IBRD / 89980 Local Councils and Capacity Post Limited 50,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-11-02 Quotations Envelope Fixture for DMC East office Building on PK-LGD -237803-GO-RFQ / Performance-based Grants to Request for Single Stage - One Procurement of IT Equipment IBRD / 89980 Local Councils and Capacity Post Limited 30,000.00 26,429.24 Signed 2021-06-09 2020-10-29 2021-08-04 2020-11-18 2021-10-03 Quotations Envelope for DMC East Building PK-LGD -237875-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of Furniture and IBRD / 89980 Local Councils and Capacity Post Limited 50,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-11-02 Quotations Envelope Fixture for DMC West office Building on PK-LGD -237877-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of IT Equipment IBRD / 89980 Local Councils and Capacity Post Limited 30,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-10-03 Quotations Envelope for DMC West Office Building on PK-LGD -237900-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of Furniture and IBRD / 89980 Local Councils and Capacity Post Limited 50,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-11-02 Quotations Envelope Fixture for DMC Malir office Building on PK-LGD -237901-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of IT Equipment IBRD / 89980 Local Councils and Capacity Post Limited 30,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-10-03 Quotations Envelope for DMC Malir Office Building on PK-LGD -237908-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of Furniture and IBRD / 89980 Local Councils and Capacity Post Limited 50,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-11-02 Quotations Envelope Fixture for DMC Korangi office Building on PK-LGD -237909-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of IT Equipment IBRD / 89980 Local Councils and Capacity Post Limited 30,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-10-03 Quotations Envelope for DMC Korangi Office Building on PK-LGD -237910-GO-RFQ / Performance-based Grants to Pending Procurement of Office Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 20,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-10-03 Appliances and Machinery for Quotations Envelope Building on DMC Korangi office PK-LGD -237916-GO-RFQ / Performance-based Grants to Pending Procurement of Furniture and Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 50,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-11-02 Fixture for District Council Quotations Envelope Building on office PK-LGD -237917-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of IT Equipment IBRD / 89980 Local Councils and Capacity Post Limited 30,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-10-03 Quotations Envelope for District Council Office Building on PK-LGD -237930-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of Furniture and IBRD / 89980 Local Councils and Capacity Post Limited 15,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-11-02 Quotations Envelope Fixture for KMC office Building on PK-LGD -237931-GO-RFQ / Performance-based Grants to Pending Request for Single Stage - One Procurement of IT Equipment IBRD / 89980 Local Councils and Capacity Post Limited 20,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-10-03 Quotations Envelope for KMC Office Building on PK-LGD -237932-GO-RFQ / Performance-based Grants to Pending Procurement of Office Request for Single Stage - One IBRD / 89980 Local Councils and Capacity Post Limited 10,000.00 0.00 Implementati 2021-06-09 2021-08-04 2021-10-03 Appliances and Machinery for Quotations Envelope Building on KMC office NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LGD -187689-NC-RFQ / PRE-POST CLEANING SURVEY Pending Technical Assistance for Solid Request for Single Stage - One OF NALLAH’S (THROUGH IBRD / 89980 Post Limited 19,000.00 0.00 Implementati 2020-08-11 2020-10-06 2020-12-05 Waste Management Quotations Envelope DRONE CAMERA AND / OR on PHYSICAL MEANS). CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PK-LGD -187691-CS-CQS / Consultancy Services for Consultant Environmental and Social Technical Assistance for Solid Under IBRD / 89980 Post Qualification Limited 35,000.00 0.00 2020-08-06 2020-06-26 2020-08-20 2020-09-19 2020-10-24 2021-01-22 Baseline Survey under WB Waste Management Implementation Selection Environmental Social Safeguard Framework PK-LGD -188167-CS-QCBS / Hiring of Consultancy Services for GIS Mappinng of Karachi Performance-based Grants to Quality And Cost- Pending along with Utility mappinng IBRD / 89980 Local Councils and Capacity Prior Open - International 5,000,000.00 0.00 2020-08-10 2020-08-31 2020-10-14 2020-11-11 2020-12-11 2021-01-15 2021-02-19 2022-08-18 Based Selection Implementation and Own Source Revenue Building Survey for all the LCs of Karachi PK-LGD -188171-CS-QCBS / Hiring of Firm for designing comprehensive ERP System for LCs (KMC, DMCs and Dist Performance-based Grants to Council) with FMIS, HRMIS, Quality And Cost- Pending IBRD / 89980 Local Councils and Capacity Post Open - International 1,500,000.00 0.00 2020-11-02 2020-12-23 2021-02-05 2021-03-05 2021-04-04 2021-05-09 2021-06-13 2022-06-13 Asset Mannagement, Own Based Selection Implementation Building Source revenue and Budgeting and Complaint Redressal Mechannism.along with separate Website PK-LGD -201920-CS-QCBS / Consultancy Services For Performance-based Grants to Engineering Design and Quality And Cost- Under IBRD / 89980 Local Councils and Capacity Post Open - International 1,500,000.00 0.00 2020-11-30 2020-11-17 2020-12-21 2020-11-25 2021-02-03 2021-03-03 2021-04-02 2021-05-07 2021-06-11 2024-06-30 Supervision of Sub Projects Based Selection Implementation Building (Works) for Local Councils of Karachi PK-LGD -203742-CS-CQS / Consultancy Services for Preparation of Procurement Performance-based Grants to Consultant Pending Standard Operating IBRD / 89980 Local Councils and Capacity Post Qualification Open - National 100,000.00 0.00 2020-11-23 2020-12-14 2021-01-27 2021-02-26 2021-04-02 2021-09-29 Implementation Procedures (SOP's) for Local Building Selection Councils for Compliance with SPPRA Rules PK-LGD -201917-CS-CQS / Consultancy Services For Performance-based Grants to Consultant Under Design & Development of IBRD / 89980 Local Councils and Capacity Post Qualification Open - National 55,000.00 0.00 2020-11-23 2020-11-24 2020-12-14 2020-12-14 2021-01-27 2021-02-26 2021-04-02 2021-09-29 Implementation Websites for CLICK and Local Building Selection Councils in Karachi PK-LGD -201874-CS-CQS / Consultancy Services For Performance-based Grants to Consultant Under Annual Performance IBRD / 89980 Local Councils and Capacity Post Qualification Open - National 200,000.00 0.00 2020-11-23 2020-12-03 2020-12-14 2020-12-14 2021-01-27 2021-02-26 2021-04-02 2024-06-30 Implementation Assessment of Local Councils Building Selection in Karachi PK-LGD -203999-CS-CQS / Consultancy Services for Consultant Technical Assistance for Solid Pending Performance Management For IBRD / 89980 Post Qualification Open - National 300,000.00 0.00 2020-11-23 2020-12-14 2021-01-27 2021-02-26 2021-04-02 2022-04-02 Waste Management Implementation Sindh Solid Waste Selection Management Board (SSWMB) PK-LGD -203986-CS-CQS / Consultancy Services For Performance-based Grants to Consultant Under Engineering Design, Quality IBRD / 89980 Local Councils and Capacity Post Qualification Open - National 300,000.00 0.00 2020-11-23 2020-11-17 2020-12-14 2020-11-24 2021-01-27 2020-12-11 2021-02-26 2021-01-29 2021-04-02 2022-04-02 Implementation Control and Supervision of Building Selection Subprojects (Works) PK-LGD -227732-CS-CQS / Technical, Financial and Legal Consultancy and Transaction Advisory Services for Performance-based Solid Consultant Technical Assistance for Solid Pending Waste Management IBRD / 89980 Post Qualification Limited 150,000.00 0.00 2021-04-08 2021-04-22 2021-05-22 2021-06-26 2021-12-23 Waste Management Implementation for Selection Sindh Solid Waste Management Board for District Central and District Korangi of Karachi Division PK-LGD -235723-CS-CQS / Performance-based Grants to Consultant Pending Consultancy Services for IBRD / 89980 Local Councils and Capacity Post Qualification Limited 250,000.00 0.00 2021-05-25 2021-06-08 2021-07-08 2021-08-12 2022-08-12 Implementation Hiring of Legal firm Building Selection PK-LGD -235726-CS-CQS / Performance-based Grants to Consultant Pending Procurement of Data Entry IBRD / 89980 Local Councils and Capacity Post Qualification Open - National 50,000.00 0.00 2021-05-26 2021-06-16 2021-07-30 2021-08-29 2021-10-03 2022-04-01 Implementation Firm for ERP Building Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LGD -187695-CS-INDV / Technical Assistance Designing Comprehensive ERP System for Local Councils of Karachi (KMC, DMC’s And Performance-based Grants to Individual Pending Distt Council) With IFmis, IBRD / 89980 Local Councils and Capacity Post Consultant Limited 6,500.00 0.00 2020-08-06 2020-08-11 2020-09-01 2020-10-06 2021-04-04 Implementation Hrmis, Asset Management, Building Selection Own Source Revenue, Budgeting, Complaint Redressal Mechanism Along with Separate Website. PK-LGD -188165-CS-INDV / Technical Assistance / Individual Consultant for GIS Performance-based Grants to Individual Pending Mapping of Karachi along with IBRD / 89980 Local Councils and Capacity Post Consultant Limited 6,500.00 0.00 2020-08-10 2020-08-15 2020-09-05 2020-10-10 2021-04-08 Implementation Utility mapping for all the LCs Building Selection of Karachi ( Short Term Contract) PK-LGD -187856-CS-INDV / Performance-based Grants to Individual Pending Assistant Contract & IBRD / 89980 Local Councils and Capacity Post Consultant Open 50,830.00 0.00 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Implementation Procurement Specialist Building Selection Page 3 Performance-based Grants to Individual PK-LGD -187870-CS-INDV / Pending IBRD / 89980 Local Councils and Capacity Post Consultant Open 50,830.00 0.00 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Assistant Finance Manager Implementation Building Selection PK-LGD -187877-CS-INDV / Performance-based Grants to Individual Pending Environment Safeguard IBRD / 89980 Local Councils and Capacity Post Consultant Open 63,537.00 0.00 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Implementation Specialist Building Selection Performance-based Grants to Individual PK-LGD -187882-CS-INDV / Pending IBRD / 89980 Local Councils and Capacity Post Consultant Limited 63,537.00 0.00 2020-08-09 2020-08-14 2020-09-04 2020-10-09 2023-10-09 Communication Specialist Implementation Building Selection PK-LGD -187883-CS-INDV / Performance-based Grants to Individual Pending Monitoring & Evaluation IBRD / 89980 Local Councils and Capacity Post Consultant Limited 65,000.00 0.00 2020-08-09 2020-08-14 2020-09-04 2020-10-09 2023-10-09 Implementation Specialist Building Selection Performance-based Grants to Individual PK-LGD -187885-CS-INDV / Pending IBRD / 89980 Local Councils and Capacity Post Consultant Limited 25,415.00 0.00 2020-08-07 2020-08-12 2020-09-02 2020-10-07 2023-10-07 IT Support officer Implementation Building Selection PK-LGD -187875-CS-INDV / Performance-based Grants to Individual Pending Assistant Social Safeguard IBRD / 89980 Local Councils and Capacity Post Consultant Open 50,830.00 0.00 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Implementation Specialist Building Selection Performance-based Grants to Individual PK-LGD -187880-CS-INDV / Pending IBRD / 89980 Local Councils and Capacity Post Consultant Open 63,537.00 0.00 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Manager Technical (Civil) Implementation Building Selection PK-LGD -187850-CS-INDV / TECHNICAL ASSISTANCE / Individual Technical Assistance for Solid Pending FOCAL PERSON FOR SWEEP IBRD / 89980 Post Consultant Limited 7,000.00 0.00 2020-08-07 2020-08-12 2020-09-02 2020-10-07 2021-01-05 Waste Management Implementation NULLAH CLEANING (Short Selection Term Contract) PK-LGD -202053-CS-INDV / Performance-based Grants to Individual Under Geographic Information IBRD / 89980 Local Councils and Capacity Post Consultant Limited 102,000.00 0.00 2020-11-15 2020-11-17 2020-11-20 2020-12-11 2021-01-15 2024-06-30 Implementation System (GIS) Specialist Building Selection Performance-based Grants to Individual PK-LGD -203751-CS-INDV / Pending IBRD / 89980 Local Councils and Capacity Post Consultant Limited 63,537.00 0.00 2020-11-16 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Social Safeguard Specialist Implementation Building Selection PK-LGD -203754-CS-INDV / Performance-based Grants to Individual Pending Assistant Environment IBRD / 89980 Local Councils and Capacity Post Consultant Limited 50,830.00 0.00 2020-11-16 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Implementation Safeguard Specialist Building Selection PK-LGD -203755-CS-INDV / Performance-based Grants to Individual Pending Assistant Manager (Internal IBRD / 89980 Local Councils and Capacity Post Consultant Limited 50,830.00 0.00 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2024-06-30 Implementation Audit) Building Selection PK-LGD -203757-CS-INDV / Performance-based Grants to Individual Pending Junior Communication IBRD / 89980 Local Councils and Capacity Post Consultant Limited 50,830.00 0.00 2020-11-16 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Implementation Specialist Building Selection PK-LGD -203760-CS-INDV / Procurement and Contract Individual Technical Assistance for Solid Under Management Specialist for IBRD / 89980 Post Consultant Limited 65,000.00 0.00 2020-11-16 2020-11-18 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Waste Management Implementation Sindh Solid Waste Selection Management Board (SSWMB) PK-LGD -203786-CS-INDV / Individual Technical Assistance for Solid Pending Financial Management IBRD / 89980 Post Consultant Limited 50,830.00 0.00 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2024-06-30 Waste Management Implementation Specialist for SSWMB Selection PK-LGD -203787-CS-INDV / Individual Technical Assistance for Solid Under Environmental Safeguard IBRD / 89980 Post Consultant Limited 50,830.00 0.00 2020-11-16 2020-11-18 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Waste Management Implementation Specialist For SSWMB Selection PK-LGD -203808-CS-INDV / Individual Technical Assistance for Solid Under Social Safeguard Specialist for IBRD / 89980 Post Consultant Limited 50,830.00 0.00 2020-11-16 2020-11-18 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Waste Management Implementation SSWMB Selection PK-LGD -203996-CS-INDV / Individual Technical Assistance for Solid Pending Waste to Energy Specialist For IBRD / 89980 Post Consultant 50,830.00 0.00 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2024-06-30 Waste Management Implementation SSWMB Selection PK-LGD -204015-CS-INDV / Individual Technical Assistance for Solid Pending Solid Waste Management IBRD / 89980 Post Consultant Limited 50,830.00 0.00 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2024-06-30 Waste Management Implementation Specialist for SSWMB Selection Performance-based Grants to Individual PK-LGD -204017-CS-INDV / Under IBRD / 89980 Local Councils and Capacity Post Consultant Limited 65,000.00 0.00 2020-11-16 2020-11-17 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Financial Advisor For PPP Unit Implementation Building Selection Performance-based Grants to Individual PK-LGD -204018-CS-INDV / Under IBRD / 89980 Local Councils and Capacity Post Consultant Limited 65,000.00 0.00 2020-11-16 2020-11-17 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Technical Advisor For PPP Unit Implementation Building Selection Performance-based Grants to Individual PK-LGD -204022-CS-INDV / Under IBRD / 89980 Local Councils and Capacity Post Consultant Limited 65,000.00 0.00 2020-11-16 2020-11-17 2020-11-21 2020-12-12 2021-01-16 2024-06-30 Legal Advisor for PPP Unit Implementation Building Selection Performance-based Grants to Individual PK-LGD -207879-CS-INDV / Pending IBRD / 89980 Local Councils and Capacity Post Consultant Limited 32,000.00 0.00 2020-12-10 2020-12-15 2021-01-05 2021-02-09 2022-02-09 ERP Specialist Implementation Building Selection PK-LGD -186638-CS-CDS / Consultancy Services for Third Technical Assistance for Solid Pending Party Monitoring and Spot IBRD / 89980 Post Direct Selection Direct 200,000.00 0.00 2020-07-30 2020-08-09 2020-10-13 2021-01-11 Waste Management Implementation Checking of Nala Cleaning Work at Karachi Page 4 PROCUREMENT PLAN Project information: Uganda, East Africa Skills for Transformation and Regional Integration Project (EASTRIP) P163399 Project Implementation agency: Inter-University Council for East Africa Date of the Procurement Plan: April 27, 2018 Period covered by this Procurement Plan: May 2018- January 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: As IUCEA does not follow Uganda PPDA, when approaching the national market (as specified in the Procurement Plan tables in STEP), Bank’s Procurement Regulations will be followed. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations –Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None PROCUREMENT Eastern Africa : East Africa Skills for Transformation and Regional Integration Project (EASTRIP) PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2019-03-14 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163399 GPN Date: 2019-08-06 Project Name: East Africa Skills for Transformation and Regional Integration Project (EASTRIP) Loan / Credit No: IDA / 63350, IDA / D3950 G Executing Agency(ies): eneral Wingate Polytechnic College WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Strengthening selected GW/NCB/W/01/2019 / Regional Flagship TVET Pending Construction of workshops Single Stage - One 2020-07- IDA / 63350 Institutes for high quality Prior Request for Bids Open - National 5,321,000.00 0.00 Implementat 2019-10-01 2019-10-06 2019-11-17 2019-12-17 2020-01-21 admin offices, clinic, staff and Envelope 19 skills development in priority ion trainee's lounge and walkway sectors Strengthening selected GW/NCB/W/02/2019 / Regional Flagship TVET Pending Single Stage - One 2020-05- Maintenance of existing IDA / 63350 Institutes for high quality Post Request for Bids Open - National 450,000.00 0.00 Implementat 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 Envelope 19 workshop skills development in priority ion sectors ET-ET WINGATE-212240-NC- Strengthening selected RFQ / Procurement of supply Regional Flagship TVET Under Request for Single Stage - One 2021-02- and fix partition wall on the IDA / 63350 Institutes for high quality Post Limited 3,700.00 0.00 Implementat 2021-01-16 2021-01-13 2021-02-09 Quotations Envelope 19 existing building for gender skills development in priority ion unit office sectors GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening selected GW/NCB/G/02/2019 / Regional Flagship TVET Pending Single Stage - One Supply, installation, and IDA / 63350 Institutes for high quality Post Request for Bids Open - National 200,000.00 0.00 Implementati 2019-06-20 2019-06-25 2019-08-06 2019-09-05 2019-10-10 2020-04-07 Envelope integration of network system skills development in priority on sectors Strengthening selected Regional Flagship TVET Pending GW/NCB/G/03/2019 / Office Single Stage - One IDA / 63350 Institutes for high quality Post Request for Bids Open - National 500,000.00 0.00 Implementati 2019-06-20 2019-06-25 2019-08-06 2019-09-05 2019-10-10 2020-04-07 & workshop furniture Envelope skills development in priority on sectors Strengthening selected Regional Flagship TVET Pending GW/NCB/G/04/2019 / IT and Single Stage - One IDA / 63350 Institutes for high quality Post Request for Bids Open - National 520,000.00 0.00 Implementati 2019-06-28 2019-07-03 2019-08-14 2019-09-13 2019-10-18 2020-04-15 Office Equipment Envelope skills development in priority on sectors Strengthening selected Regional Flagship TVET Pending GW/NCB/G/05/2019 / Digital Single Stage - One IDA / 63350 Institutes for high quality Post Request for Bids Open - National 263,000.00 0.00 Implementati 2020-06-01 2020-06-06 2020-07-18 2020-08-17 2020-09-21 2021-03-20 Library Envelope skills development in priority on sectors Strengthening selected Regional Flagship TVET Pending Single Stage - One GW/NCB/G/07/2019 / Books IDA / 63350 Institutes for high quality Post Request for Bids Open - National 100,000.00 0.00 Implementati 2019-08-05 2019-08-10 2019-09-21 2019-10-21 2019-11-25 2020-05-23 Envelope skills development in priority on sectors Strengthening selected Regional Flagship TVET Pending GW/NCB/G/08/2019 / Request for Single Stage - One IDA / 63350 Institutes for high quality Post Limited 80,000.00 0.00 Implementati 2019-09-07 2019-11-02 2020-04-30 medical supplies Quotations Envelope skills development in priority on sectors Strengthening selected Regional Flagship TVET Pending GW/NCB/G/09/2019 / Single Stage - One IDA / 63350 Institutes for high quality Post Request for Bids Open - National 110,000.00 0.00 Implementati 2021-04-01 2021-04-06 2021-05-18 2021-06-17 2021-07-22 2022-01-18 kitchen tools and equipment Envelope skills development in priority on sectors Strengthening selected Regional Flagship TVET Pending GW/NCB/G/06/2019 / Request for Single Stage - One IDA / 63350 Institutes for high quality Post Open - National 20,000.00 0.00 Implementati 2019-09-07 2019-11-02 2020-04-30 Personal protective equipment Quotations Envelope skills development in priority on sectors Strengthening selected GW/ICB/G/01/2019 / Regional Flagship TVET Pending Single Stage - One Procurement of Workshop IDA / 63350 Institutes for high quality Prior Request for Bids Open - International 2,280,000.00 0.00 Implementati 2019-06-20 2019-06-25 2019-08-06 2019-09-05 2019-10-10 2020-04-07 Envelope Equipment skills development in priority on sectors Strengthening selected ET-ET WINGATE-206172-GO- Regional Flagship TVET Under RFQ / Procurement of ICT and Request for Single Stage - One IDA / 63350 Institutes for high quality Post Limited 70,000.00 0.00 Implementati 2020-12-04 2020-12-10 2020-12-28 2021-01-12 Office Equipment for PIU and Quotations Envelope skills development in priority on Administrative staff sectors Strengthening selected ET-ET WINGATE-206584-GO- Regional Flagship TVET Under RFQ / Procurement of office Request for Single Stage - One IDA / 63350 Institutes for high quality Post Limited 20,000.00 0.00 Implementati 2020-12-04 2020-12-15 2020-12-30 2021-01-06 furniture for administrative Quotations Envelope skills development in priority on and PIU staff sectors Page 1 ET-ET WINGATE-229637-GO- Strengthening selected RFB / Procurement of Regional Flagship TVET Pending Single Stage - Two Equipment for Electrical IDA / 63350 Institutes for high quality Post Request for Bids Open - International 1,150,000.00 0.00 Implementati 2021-05-15 2021-06-29 2021-07-04 2021-09-16 2021-10-21 2022-02-18 Envelope Laboratory Workstation for on skills development in priority on going trainings sectors ET-ET WINGATE-233737-GO- Strengthening selected RFQ / Procurement of tools Regional Flagship TVET Pending Request for Single Stage - One and equipment for existing IDA / 63350 Institutes for high quality Post Limited 14,200.00 0.00 Implementati 2021-05-22 2021-07-08 2021-07-22 Quotations Envelope electrical maintenance skills development in priority on workshop sectors ET-ET WINGATE-231689-GO- Strengthening selected RFB / Procurement of Regional Flagship TVET Pending Request for Single Stage - One Supply,Installation and IDA / 63350 Institutes for high quality Post Limited 100,000.00 0.00 Implementati 2021-05-15 2021-07-03 2021-07-17 Quotations Envelope Commissioning of Heavy Duty skills development in priority on Silent Generator sectors ET-ET WINGATE-235716-GO- Strengthening selected RFQ / Procurement of ICT Regional Flagship TVET Pending Request for Single Stage - One equipment for on-going IDA / 63350 Institutes for high quality Post Limited 100,000.00 0.00 Implementati 2021-06-01 2021-07-02 2021-07-12 Quotations Envelope trainings of General Wingate skills development in priority on Polytechnic College sectors ET-ET WINGATE-235733-GO- Strengthening selected RFB / Procurement of Regional Flagship TVET Pending Single Stage - One furniture for on-going IDA / 63350 Institutes for high quality Post Request for Bids Open - National 120,000.00 0.00 Implementati 2021-06-07 2021-06-21 2021-07-21 2021-08-11 2021-09-15 2021-10-15 Envelope training of General Wingate skills development in priority on Polytechnic College. sectors NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-ET WINGATE-206963-NC- Strengthening selected RFQ / Procurement of 15 Regional Flagship TVET Under Minutes base line Request for Single Stage - One IDA / 63350 Institutes for high quality Post Limited 10,000.00 0.00 Implementati 2020-12-13 2021-01-20 2021-02-07 2021-04-08 documentary video Quotations Envelope skills development in priority on production on GWPTC and on sectors its electrical and digitization center. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening selected GW/QCBS/CS/01/2019 / Regional Flagship TVET Quality And Cost- Under Design, supervision and IDA / 63350 Institutes for high quality Post Open - National 250,000.00 0.00 2019-09-02 2020-07-22 2019-09-23 2020-08-03 2019-11-06 2020-11-23 2019-12-04 2020-12-24 2020-01-03 2020-02-07 2020-03-13 2021-03-13 Based Selection Implementation contract Administration skills development in priority sectors Strengthening selected GW/QCS/CS/12/2019 / Regional Flagship TVET Consultant Pending consultants for equipment IDA / 63350 Institutes for high quality Post Qualification Open - International 225,000.00 0.00 2019-06-24 2019-07-15 2019-08-28 2019-09-27 2019-11-01 2020-04-29 Implementation specification development skills development in priority Selection sectors Strengthening selected ET-ET WINGATE-206967-CS- Regional Flagship TVET QCBS / Consultancy services Quality And Cost- Pending IDA / 63350 Institutes for high quality Post Open - National 225,000.00 0.00 2020-12-24 2021-01-14 2021-02-27 2021-03-27 2021-04-26 2021-05-31 2021-07-05 2022-07-05 for the institutes strategic Based Selection Implementation skills development in priority plan development . sectors Strengthening selected ET-ET WINGATE-206925-CS- Regional Flagship TVET Consultant CQS / Consultancy service for Under IDA / 63350 Institutes for high quality Post Qualification Open - National 60,000.00 0.00 2020-12-24 2020-12-17 2021-01-14 2021-02-27 2021-03-13 2021-04-06 2021-06-05 labor market assessment for Implementation skills development in priority Selection energy sector of Ethiopia. sectors ET-ET WINGATE-208703-CS- Strengthening selected CQS / Consultancy service for Regional Flagship TVET Consultant Under conducting skill gap IDA / 63350 Institutes for high quality Post Qualification Open - National 15,000.00 0.00 2020-12-31 2021-02-28 2021-01-21 2021-02-25 2021-03-18 2021-04-15 2021-06-14 Implementation assessment of industry skills development in priority Selection workers. sectors ET-ET WINGATE-206975-CS- CQS / Consultancy service for Strengthening selected conducting skill gap Regional Flagship TVET Consultant assessment and identification Under IDA / 63350 Institutes for high quality Post Qualification Open - National 38,000.00 0.00 2020-12-31 2021-02-28 2021-01-21 2021-03-06 2021-04-05 2021-05-10 2021-11-06 of occupations and Implementation skills development in priority Selection qualifications of College sectors managers, leaders and trainers. ET-ET WINGATE-206980-CS- Strengthening selected CQS / Consultancy service for Regional Flagship TVET Consultant conducting problem focused Under IDA / 63350 Institutes for high quality Post Qualification Open - National 15,000.00 0.00 2020-12-25 2021-03-24 2021-01-15 2021-02-28 2021-03-30 2021-05-04 2021-10-31 research for project Implementation skills development in priority Selection beneficiary manufacturing sectors industries in Addis Ababa. ET-ET WINGATE-231220-CS- CQS / Procurement of Design Strengthening selected and Develop Website, Regional Flagship TVET Consultant Under Registrar system and E- IDA / 63350 Institutes for high quality Post Qualification Open - National 30,000.00 0.00 2021-04-29 2021-04-23 2021-05-20 2021-06-17 2021-07-08 2021-08-12 2021-10-11 Implementation learning platform for General skills development in priority Selection Wingate polytechnic College ( sectors GWPTC) ET-ET WINGATE-233733-CS- Strengthening selected CQS / Consultancy service for Regional Flagship TVET Consultant Pending conducting tracer study of IDA / 63350 Institutes for high quality Post Qualification Open - National 50,000.00 0.00 2021-05-14 2021-05-28 2021-06-25 2021-07-16 2021-08-20 2021-10-04 Implementation General Wingate Polytechnic skills development in priority Selection College sectors Page 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening selected GW/IC/CS/02/2019 / "Project Regional Flagship TVET Individual Manager IDA / 63350 Institutes for high quality Post Consultant Open 110,000.00 1,438.78 Signed 2019-03-20 2019-06-26 2019-05-08 2020-06-01 2019-05-29 2020-06-11 2019-07-03 2020-06-15 2019-12-30 skills development in priority Selection " sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/03/2019 / Deputy Under IDA / 63350 Institutes for high quality Post Consultant Open 95,000.00 0.00 2019-03-20 2020-12-16 2019-05-08 2019-05-29 2019-07-03 2019-12-30 project manager Implementation skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/04/2019 / IDA / 63350 Institutes for high quality Prior Consultant Open 95,000.00 0.00 Canceled 2019-03-20 2019-05-10 2019-05-08 2019-05-29 2019-07-03 2019-12-30 Procurement specialist skills development in priority Selection sectors Strengthening selected GW/IC/CS/06/2019 / Regional Flagship TVET Individual Financial management IDA / 63350 Institutes for high quality Post Consultant Open 95,000.00 0.00 Canceled 2019-03-20 2019-06-26 2019-05-08 2019-05-29 2019-07-03 2019-12-30 specialist skills development in priority Selection sectors Strengthening selected GW/IC/CS/09/2019 / Regional Flagship TVET Individual Under Monitoring and Evaluation IDA / 63350 Institutes for high quality Post Consultant Open 75,000.00 0.00 2019-03-20 2019-06-26 2019-05-08 2019-05-29 2019-07-03 2019-12-30 Implementation officer skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/11/2019 / Under IDA / 63350 Institutes for high quality Post Consultant Open 100,000.00 0.00 2019-06-03 2020-07-22 2019-07-22 2020-11-11 2019-08-12 2020-11-11 2019-09-16 2020-03-14 contract administration staff Implementation skills development in priority Selection sectors Strengthening selected GW/IC/CS/10/2019 / Regional Flagship TVET Individual Under Environmental and social IDA / 63350 Institutes for high quality Post Consultant Open 60,000.00 0.00 2019-05-28 2019-06-26 2019-07-16 2019-08-06 2019-09-10 2020-03-08 Implementation safeguard specialist skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/07/2019 / IDA / 63350 Institutes for high quality Post Consultant Open 80,000.00 0.00 Canceled 2019-03-20 2019-05-08 2019-05-29 2019-07-03 2019-12-30 Accountant skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/05/2019 / IDA / 63350 Institutes for high quality Prior Consultant Open 80,000.00 0.00 Canceled 2019-03-20 2019-05-08 2019-05-29 2019-07-03 2019-12-30 Procurement officer skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/08/2019 / Internal IDA / 63350 Institutes for high quality Post Consultant Open 65,000.00 0.00 Canceled 2019-12-02 2020-01-20 2020-02-10 2020-03-16 2020-09-12 auditor skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/13/2019 / Under IDA / 63350 Institutes for high quality Post Consultant Open 65,000.00 0.00 2019-05-28 2019-06-26 2019-07-16 2019-08-06 2019-09-10 2020-03-08 Industry liaise officer Implementation skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/14/2020 / IDA / 63350 Institutes for high quality Prior Consultant Limited 95,000.00 0.00 Canceled 2020-03-16 2020-04-16 2020-03-21 2020-04-15 2020-04-11 2020-07-24 2020-05-16 2020-11-12 procurement Specialist skills development in priority Selection sectors Strengthening selected GW/IC/CS/15/2020 / Regional Flagship TVET Individual Financial Management IDA / 63350 Institutes for high quality Post Consultant Limited 95,000.00 814.90 Signed 2020-03-16 2020-03-26 2020-03-21 2020-03-27 2020-04-11 2020-05-15 2020-05-16 2020-06-15 2020-11-12 Specialist skills development in priority Selection sectors Strengthening selected GW/IC/CS/16/2020 / Regional Flagship TVET Individual Under Monitoring and Evaluation IDA / D3950 Institutes for high quality Post Consultant Open 75,000.00 0.00 2020-05-06 2020-05-08 2020-06-24 2020-09-25 2020-07-15 2020-08-19 2021-02-15 Implementation Officer skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual GW/IC/CS/17/2020 / Under IDA / 63350 Institutes for high quality Post Consultant Open 65,000.00 0.00 2020-05-06 2020-05-08 2020-06-24 2020-07-15 2020-08-19 2021-02-15 Industry liaison officer Implementation skills development in priority Selection sectors Strengthening selected GW/IC/CS/18/2020 / Regional Flagship TVET Individual Under Environmental and Social IDA / 63350 Institutes for high quality Post Consultant Open 60,000.00 0.00 2020-05-04 2020-05-08 2020-06-22 2020-07-13 2020-08-17 2021-02-13 Implementation safeguard specialist skills development in priority Selection sectors Strengthening selected GW/IC/CS/14/2020-R / Regional Flagship TVET Individual Selection of Procurement IDA / 63350 Institutes for high quality Prior Consultant Limited 95,000.00 17,835.16 Signed 2020-10-16 2020-10-20 2020-10-21 2020-10-26 2020-10-31 2020-11-22 2020-11-11 2020-11-23 2021-11-06 Specialist skills development in priority Selection sectors Strengthening selected ET-ET WINGATE-208885-CS- Regional Flagship TVET Individual INDV / Consultancy service Under IDA / 63350 Institutes for high quality Post Consultant Open 95,000.00 0.00 2020-12-24 2020-12-14 2021-02-02 2021-02-16 2021-03-16 2022-03-16 for Financial Management Implementation skills development in priority Selection Specialist sectors Page 3 PROCUREMENT PLAN Project information: Sint Maarten Emergency Debris Management Project (P167347) Project Implementation agency: NRPB Date of the Procurement Plan: 04/18/2020 Period covered by this Procurement Plan: April 2020 to April 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is applicable for those contracts identified in the Procurement Plan tables]; Works: [is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. PROCUREMENT St Maarten : Sint Maarten Emergency Debris Management Project PLAN General Information Country: St Maarten Bank’s Approval Date of the Original Procurement Plan: 2019-08-21 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167347 GPN Date: Project Name: Sint Maarten Emergency Debris Management Project Loan / Credit No: TF / A9261 National Recovery Program Bureau Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SX-NRPB-140867-CW-RFB / Debris Clearance and Single Stage - One 12,220,000. 2020-08- Ship salvaging and shoreline TF / A9261 Prior Request for Bids Open - International 2,850,000.00 Signed 2019-10-25 2019-11-11 2019-10-25 2019-11-13 2019-12-06 2020-02-17 2020-01-05 2020-09-29 2020-02-09 2021-02-22 Management Envelope 00 07 debris clearance Pending SX-NRPB-159745-CW-RFB / Debris Clearance and Single Stage - One 2021-01- TF / A9261 Post Request for Bids Open - National 500,000.00 0.00 Implementat 2020-03-18 2020-03-23 2020-05-04 2020-06-03 2020-07-08 Access road to TDSR Management Envelope 04 ion SX-NRPB-226241-CW-RFB / TDSR - Roads installation, Pending temporary debris storage and Debris Clearance and Single Stage - One 2022-05- TF / A9261 Post Request for Bids Open - International 7,000,000.00 0.00 Implementat 2021-07-18 2021-07-23 2021-09-03 2021-10-03 2021-11-07 reduction equipment Management Envelope 06 ion purchase and Installation: including Tire Shredder, Wood Chipper, SX-NRPB-142837-CW-RFB / Pending Debris Clearance and Single Stage - One 2020-09- Car wreck removal and TF / A9261 Post Request for Bids Open - International 500,000.00 0.00 Implementat 2019-11-29 2019-12-04 2020-01-15 2020-02-14 2020-03-20 Management Envelope 16 disposal ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-126809-GO-DIR / Debris Clearance and TF / A9261 Prior Direct Selection Direct 600,000.00 0.00 Canceled 2019-08-12 2019-08-17 2019-09-21 2020-03-19 Landfill COmpactor Management SX-NRPB-126810-GO-DIR / Debris Clearance and TF / A9261 Prior Direct Selection Direct 600,000.00 600,000.00 Signed 2019-08-12 2019-10-18 2019-08-17 2019-11-14 2019-09-21 2019-10-08 2020-03-19 D8T Waste Handling Bulldozer Management SX-NRPB-126833-GO-RFQ / Debris Clearance and Request for Single Stage - One TF / A9261 Post Limited 3,000.00 0.00 Canceled 2019-08-12 2019-08-13 2019-10-11 2020-04-08 Oil, Fuel and anti-freeze Management Quotations Envelope Pending SX-NRPB-141416-GO-RFB / Debris Clearance and Request for Single Stage - One TF / A9261 Post Open - International 150,000.00 0.00 Implementati 2019-12-02 2019-12-07 2020-01-18 2020-02-17 2020-03-23 2020-09-19 Weighbridge Management Quotations Envelope on Pending SX-NRPB-152796-GO-RFQ / Debris Clearance and Request for Single Stage - One TF / A9261 Post Limited 220,000.00 0.00 Implementati 2020-01-11 2020-03-07 2020-09-03 Wheel-Loader Equipment Management Quotations Envelope on SX-NRPB-126809-GO-RFQ / Debris Clearance and Request for Single Stage - One TF / A9261 Prior Limited 600,000.00 0.00 Canceled 2020-04-22 2020-06-17 2020-12-14 Landfill Compactor Management Quotations Envelope SX-NRPB-169181-GO-DIR / Debris Clearance and TF / A9261 Prior Direct Selection Direct 35,000.00 34,050.00 Signed 2020-04-17 2021-03-25 2020-04-22 2021-03-29 2020-05-27 2020-04-07 2020-11-23 Posi-Shell Management SX-NRPB-184298-GO-DIR / Debris Clearance and TF / A9261 Post Direct Selection Direct 800,000.00 738,000.00 Signed 2020-07-20 2020-07-01 2020-07-25 2020-06-23 2020-08-29 2020-10-30 2021-02-25 Landfill Waste Compactor Management SX-NRPB-179886-GO-RFQ / Debris Clearance and Request for Single Stage - One TF / A9261 Post Open - National 50,000.00 0.00 Canceled 2020-06-17 2020-08-12 2021-02-08 2 40ft storage containers Management Quotations Envelope SX-NRPB-142850-GO-RFQ / Debris Clearance and Request for Single Stage - One TF / A9261 Post Open - International 100,000.00 0.00 Canceled 2019-12-04 2020-01-29 2020-07-27 Tire Shredder Management Quotations Envelope SX-NRPB-142847-GO-RFQ / Debris Clearance and Request for Single Stage - One TF / A9261 Post Open - International 50,000.00 0.00 Canceled 2019-12-04 2020-01-29 2020-07-27 Wood chipper Management Quotations Envelope SX-NRPB-141408-GO-RFQ / Pending Debris Clearance and Request for Single Stage - One Storage containers with TF / A9261 Post Open - National 50,000.00 0.00 Implementati 2019-11-13 2020-01-08 2020-07-06 Management Quotations Envelope climate control on SX-NRPB-226244-GO-RFQ / Project Management and Request for Single Stage - One Purchase of Portland Cement TF / A9261 Post Limited 50,000.00 0.00 Canceled 2021-04-10 2021-06-05 2021-12-02 Implementation Support Quotations Envelope Class 1 Pending SX-NRPB-142843-GO-DIR / Debris Clearance and TF / A9261 Post Direct Selection Direct 150,000.00 0.00 Implementati 2020-01-06 2020-01-11 2020-02-15 2020-08-13 Personal Protective Equipment Management on Pending SX-NRPB-229732-GO-DIR / Debris Clearance and TF / A9261 Post Direct Selection Direct 30,000.00 0.00 Implementati 2021-04-20 2021-04-25 2021-05-30 2021-11-26 Front Loader Bucket: RIMCO Management on Pending SX-NRPB-235566-GO-DIR / Project Management and TF / A9261 Post Direct Selection Direct 50,000.00 0.00 Implementati 2021-05-21 2021-05-26 2021-06-30 2021-12-27 Purchase of Portland Cement Implementation Support on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 SX-NRPB-169182-NC-DIR / Pending Project Management and Heavy Equipment TF / A9261 Post Direct Selection Direct 100,000.00 0.00 Implementati 2020-04-17 2020-04-22 2020-05-27 2020-11-23 Implementation Support Maintenance: RIMCO on SX-NRPB-225232-NC-DIR / Under Project Management and Heavy Equipment TF / A9261 Post Direct Selection Direct 10,000.00 0.00 Implementati 2021-03-18 2021-03-17 2021-03-23 2021-03-18 2021-04-27 2021-10-24 Implementation Support Maintenance: JMP on Hydraulique CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-140869-CS-QCBS / Debris Clearance and Quality And Cost- Supervision Ship Salvaging TF / A9261 Prior Open - International 300,000.00 1,486,745.00 Signed 2019-10-25 2019-11-16 2019-11-15 2019-11-18 2019-12-29 2020-03-30 2020-01-26 2020-05-08 2020-02-25 2020-09-29 2020-03-31 2021-01-21 2020-05-05 2021-02-12 2021-05-05 Management Based Selection and Shoreline Debris SX-NRPB-142839-CS-QCBS / Debris Clearance and Quality And Cost- Pending Supervision car wreck removal TF / A9261 Post Open - International 100,000.00 0.00 2019-11-29 2019-12-20 2020-02-02 2020-03-01 2020-03-31 2020-05-05 2020-06-09 2021-06-09 Management Based Selection Implementation and disposal SX-NRPB-140864-CS-QCBS / Quality And Cost- TF / A9261 Technical Assistance Post Open - International 50,000.00 0.00 Canceled 2020-01-14 2020-02-04 2020-03-19 2020-04-16 2020-05-16 2020-06-20 2020-07-25 2021-07-25 Draft Medical Waste Policy Based Selection Consultant SX-NRPB-142855-CS-CQS / Debris Clearance and TF / A9261 Post Qualification Limited 300,000.00 249,990.00 Signed 2019-11-22 2021-04-14 2019-12-06 2021-04-19 2020-01-05 2021-04-20 2020-02-09 2019-05-06 2020-08-07 Resettlement Action Plan Management Selection SX-NRPB-210410-CS-NPO / Debris Clearance and Non-Profit TF / A9261 Post Direct 100,000.00 33,190.00 Signed 2020-12-18 2021-04-01 2021-01-29 2021-04-01 2021-03-05 2021-04-22 2021-09-01 Environmental Monitoring Management Organizations SX-NRPB-146735-CS-QCBS / Quality And Cost- Pending Vector control plan and tools TF / A9261 Technical Assistance Post Open - International 250,000.00 0.00 2020-01-27 2020-02-17 2020-04-01 2020-04-29 2020-05-29 2020-07-03 2020-08-07 2021-08-07 Based Selection Implementation + Supervision for TDSR INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-135800-CS-CDS / Project Management and TF / A9261 Post Direct Selection Direct 80,000.00 131,806.58 Signed 2019-09-25 2019-08-06 2019-10-05 2019-08-14 2019-12-09 2020-01-20 2020-06-06 Resettlement expert Implementation Support SX-NRPB-142854-CS-CDS / Debris Clearance and TF / A9261 Prior Direct Selection Direct 1,000,000.00 938,168.00 Signed 2019-10-25 2020-08-10 2019-11-04 2019-03-12 2020-01-08 2019-05-20 2020-07-06 ESIA Fire Suppression Management Individual SX-NRPB-159742-CS-INDV / Project Management and Under TF / A9261 Post Consultant Open 150,000.00 0.00 2020-02-17 2020-03-27 2020-04-06 2021-05-04 2020-04-27 2020-06-01 2020-11-28 Project Engineer Implementation Support Implementation Selection SX-NRPB-179890-CS-CDS / Interim Resettlement Expert TF / A9261 Technical Assistance Post Direct Selection Direct 5,000.00 9,000.00 Signed 2020-06-12 2020-06-11 2020-06-22 2019-08-18 2020-08-26 2020-06-19 2021-02-22 Contract SX-NRPB-187037-CS-CDS / Project Management and TF / A9261 Post Direct Selection Direct 65,000.00 76,200.00 Signed 2020-08-03 2020-08-06 2020-08-13 2020-08-06 2020-10-17 2020-08-26 2021-04-15 Interim Project Manager Implementation Support Individual SX-NRPB-192966-CS-INDV / Debris Clearance and Under TF / A9261 Post Consultant Open 20,000.00 0.00 2020-09-14 2020-11-12 2020-11-02 2020-11-23 2020-12-28 2021-06-26 Pre-design TDSR site Management Implementation Selection SX-NRPB-220241-CS-INDV / Individual Strategic Programme Project Management and Under TF / A9261 Post Consultant Open 250,000.00 0.00 2021-03-01 2021-02-25 2021-04-19 2021-05-06 2021-05-10 2021-06-11 2021-06-14 2021-12-11 Coordinator Waste Implementation Support Implementation Selection Management Individual SX-NRPB-142851-CS-INDV / Pending TF / A9261 Technical Assistance Post Consultant Open 50,000.00 0.00 2020-01-06 2020-02-24 2020-03-16 2020-04-20 2020-10-17 Draft Medical Waste policy Implementation Selection Individual SX-NRPB-227298-CS-INDV / Project Management and Pending TF / A9261 Post Consultant Open 150,000.00 0.00 2021-04-09 2021-05-12 2021-05-22 2021-05-25 2021-11-21 Resettlement Coordinator Implementation Support Implementation Selection SX-NRPB-228360-CS-CDS / Project Management and Under Interim Contract Project TF / A9261 Post Direct Selection Direct 10,000.00 0.00 2021-04-09 2021-04-13 2021-04-19 2021-04-07 2021-06-23 2021-12-20 Implementation Support Implementation Manager Individual SX-NRPB-231294-CS-INDV / Project Management and Under TF / A9261 Post Consultant Direct 180,000.00 0.00 2021-04-23 2021-04-29 2021-05-03 2021-05-10 2021-05-14 2022-05-09 Resettlement Coordinator Implementation Support Implementation Selection SX-NRPB-232744-CS-CDS / Project Management and Under Interim Remote Resettlement TF / A9261 Post Direct Selection Direct 15,000.00 0.00 2021-05-03 2021-05-05 2021-05-13 2021-05-25 2021-07-17 2022-01-13 Implementation Support Implementation Specialist SX-NRPB-237087-CS-CDS / Project Management and Under Interim remote - Program TF / A9261 Post Direct Selection Direct 16,500.00 0.00 2021-05-28 2021-06-01 2021-06-07 2021-06-07 2021-08-11 2022-02-07 Implementation Support Implementation Coordinator Waste Page 2 PROCUREMENT PLAN General 1. Project Information a. Country: Federal Republic of Somalia b. Project Name: Water For Agro-Pastoral and Reselience Productivity c. Project Number: P167826 d. Total Finance: USD 5 Million 2. Project Implementation Agency: South West State of Somalia 3. Date of Project Plan: October 2018 4. Period Covered by this Procurement: January 2019 – June 2020 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Document: The Bank’s standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified into Procurement Plan tables in STEP III. National Procurement Arrangements: Not applicable IV. Prequalification: Not applicable V. Leased Assets: Not Applicable 1 VI. Procurement of Second hand Goods: Not Applicable VII. Domestic Preference: Not Applicable VIII. Hands on Expanded Implementation Support (HEIS): Not Applicable IX. Other Relevant Procurement Information: Not Applicable X. Thresholds for Procurement Approaches and Method (US$ millions) Thresholds for Procurement Approaches and Methods (US$ millions)– Goods, Works, and Non-Consulting Services Category Prior Open Open Request for Review Internation Nation Quotation (US$ al al (RfQ) millions) Works all ≥ 5.0 < 5.0 ≤ 0.2 Goods, IT, and all ≥ 0.5 < 0.5 ≤ 0.1 non-consulting services Thresholds for Procurement Approaches and Methods (US$, millions) – Consulting Services Category Prior Short List of National Consultants Review Consulting Engineering and (US$, Services Construction millions) Supervision Consultants n.a n.a. all (Firms) Individual all n.a. n.a. Consultants 2 South West Procurement Plan XI. Packages for Goods, Works and Non-Consulting Services (At Negotiations – to be entered in STEP) R Contract Estimate Revie Market Sel Eval Procure Preq Do Expected Expected ef Description d Cost w by Approac ecti uati ment ualif mes date of date of . (US$) Bank h (Open- on on Process icati tic bid/ Contract N (Prior National Me Opti (Single on Pref proposal Signatur o / / Limited tho ons stage- (Yes/ ere opening e Post) etc.) d (BA single No) nce (RF FO envelop (Yes P, Rat e etc.) /No) RF ed B, Crit RF eria Q etc. etc ) .) GOODS Low est Single G Purchase of 5 Open Eval stage 02/Mar/20 02/Apr/20 $175,000 Prior RFB N/A N/A 1 vehicles National uate One- 19 19 d Envelop Cost Low Office Equipment est Singe (Laptops, G Eval stage 04/Mar/20 04/Apr/20 Desktops, $30,000 Prior Limited RFQ N/A N/A 2 Projector, Printers uate One - 19 19 and accessories) d Envelop Cost 3 Low est Single G Eval Stage 05/May/20 05/Jun/201 GIS Equipment $25,000 Prior Limited RFQ N/A N/A 3 uate One- 19 9 d Envelop Cost Low est Single Hydrological G Eval Stage 15/Oct/20 16/Nov/20 Water Monitoring $12,000 Prior Limited RFQ N/A N/A 4 Tools uate One- 19 19 d Envelop Cost Low est Single G Open Eval Stage 21/Mar/20 22/Apr/20 Vehicle Fuels $80,000 Prior RFQ N/A N/A 6 National uate One- 19 19 d Envelop Cost Low est Single G Office furniture Eval Stage 12/Jun/202 13/Jul/202 $30,000 Prior Limited RFQ N/A N/A 7 (Chairs, Tables, ) uate One- 0 0 d Envelop Cost Total Goods $352,000 WORKS Construction of Low Sand Dams/Sub- est Single W surface Dams Open Eval stage – 09/Nov/20 10/Dec/20 $90,000 Prior RFQ N/A N/A 1 National uate one 19 19 d envelope Cost 4 Construction of Low Earth Dams est Single W Open Eval stage – 01/Oct/20 02/Nov/20 $90,000 Prior RFQ N/A N/A 2 National uate one 19 19 d envelope Cost Construction/Reh Low abilitation of 10 est Single W Berkads Open Eval stage – 01/Sep/20 01/Oct/20 $42,000 Prior RFQ N/A N/A 3 National uate one 19 19 d envelope Cost Rehabilitation of Low Boreholes/Shallow est Single W Wells Open Eval stage – 18/Aug/20 19/Sep/20 $50,000 Prior RFQ N/A N/A 4 National uate one 19 19 d envelope Cost Office Low Construction/Reh est Single W abilitation Open Eval stage – 01/Aug/20 01/Sep/20 $70,000 Prior RFQ N/A N/A 5 National uate one 19 19 d envelope Cost Total Works $342,000 Non -Consulting Services Total Non- Consultant Service Consulting Services 5 Re Contract Estimate Review Market Selecti Shortli Expected Expected f Description d Cost by Bank Approach on sting Date of Date of No (US$) (Prior/Po (Open- Metho (Yes/N Bid Contract . st) National/ d o) Proposal Signatur Limited (QCBS Opening e etc.) , LCBCS , QBS, DS Site selection, geophysical surveying, Open – 16/Mar/201 15/Apr/20 C1 100,000 Prior CQS N/A contracting and National 9 19 engineering support Develop GIS map Prior Open - CQS 08/Aug/20 C2 for potential sites 20,000 N/A 08/Jul/2019 National 19 creation of village livelihood development Open - 13/May/202 10/Jun/202 C3 plans & water 500,000 Prior QCBS N/A International 0 0 budgets implement rural development policies and laws Open 12/Feb/20 C4 to regulate sector 50,000 Prior CQS N/A 15/Jan/2020 and ensure National 20 sustainability technical assistance agency Open 22/Feb/202 19/Mar/20 C5 for training 60,000 Prior CQS N/A assessment, National 0 20 selecting, training 6 and monitoring field service support, acquisition and application of geo-spatial Open – 01/Mar/202 01/Apr/20 C6 imagery for 20,000 Prior CQS N/A before and after National 0 20 satelite photos Procurement 05/Feb/20 C7 50,000 Prior Open INDV N/A 05/Jan/2019 Specialist 19 Open INDV 05/Feb/20 C8 Finance Specialist 50,000 Prior N/A 05/Jan/2019 19 Open INDV 10/Feb/201 10/Mar/20 C9 Project Engineer 72,000 Prior N/A 9 19 C1 Open INDV 31/Oct/20 2 Site Engineers 21,000 Prior N/A 01/Oct/2019 0 19 Total $943,000 Consulting Services $1,637,0 Grand Total 00 7 PROCUREMENT Somalia : Somalia - Water for Agro-pastoral Productivity and Resilience PLAN General Information Country: Somalia Bank’s Approval Date of the Original Procurement Plan: 2020-02-18 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167826 GPN Date: Project Name: Somalia - Water for Agro-pastoral Productivity and Resilience Loan / Credit No: IDA / D4970 Puntland Ministry of Planning, Economic Development and International Cooperation Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SO-MOPIC - PL-174463-CW- RFB / Construction of Ministry Component 4: Project of Planning, Economic Management, M & E, Single Stage - One 2021-03- IDA / D4970 Prior Request for Bids Open - National 285,000.00 341,801.64 Signed 2020-05-24 2020-10-16 2020-05-29 2020-10-19 2020-07-10 2020-11-25 2020-08-09 2021-01-04 2020-09-13 2021-01-12 Development and Knowledge Management and Envelope 12 International Cooperation Learning offices. SO-MOPIC - PL-178126-CW- RFQ / Rehabilitation and Component 2. Institutional Request for Single Stage - One 2021-02- IDA / D4970 Prior Open - National 180,000.00 179,968.80 Completed 2020-06-26 2020-08-21 2020-08-21 2020-10-28 Extending of MoEACC Office and Capacity Development Quotations Envelope 17 in Garowe Component 4: Project SO-MOPIC - PL-182498-CW- Management, M & E, Request for Single Stage - One 2021-03- RFQ / Construction of MoLAH IDA / D4970 Prior Limited 50,000.00 49,139.25 Completed 2020-07-09 2020-09-18 2020-09-03 2020-10-14 Knowledge Management and Quotations Envelope 02 Conference Hall Learning SO-MOPIC - PL-178198-CW- Component 4: Project RFQ / Rehabilitation of Management, M & E, Request for Single Stage - One 2021-02- Meeting Room at the Puntland IDA / D4970 Prior Limited 10,000.00 9,853.76 Completed 2020-06-25 2020-09-14 2020-08-20 2020-10-07 Knowledge Management and Quotations Envelope 16 Ministry of Energy, Mineral Learning and Water (MoEMW) SO-MOPIC - PL-214242-CW- RFQ / Construction of Component 1: Support the Request for Single Stage - One 2021-09- Subsurface Dam in Rabable IDA / D4970 Development of Multiple Use Prior Limited 101,982.95 97,940.72 Signed 2021-01-30 2021-03-11 2021-03-27 2021-04-22 Quotations Envelope 23 Village, Nugaal Region, Water Sources Puntland, Somalia SO-MOPIC - PL-218499-CW- RFQ / Rehabilitation of four Pending Community Centers and Component 2. Institutional Request for Single Stage - One 2021-10- IDA / D4970 Prior Limited 135,000.00 0.00 Implementat 2021-03-04 2021-04-29 Rangeland in Meeladeen, and Capacity Development Quotations Envelope 26 ion Raydable, Lasodawoco and Xamxama. SO-MOPIC - PL-232616-CW- RFQ / Construction of Arc Component 1: Support the Request for Under Request for Single Stage - One 2022-01- Gravity Dam in Ceel Dahir IDA / D4970 Development of Multiple Use Prior Limited Quotations (Non 120,795.94 0.00 Implementat 2021-05-13 2021-06-13 2021-07-08 Quotations Envelope 04 Village, Bari Region, Puntland Water Sources Bank-SPD) ion Somalia GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPIC - PL-173788-GO- RFB / Procurement of 9 Vehicles for Puntland Ministry of Environment Agriculture Component 3: Supporting and Climate Change, Ministry Sustainable Land Single Stage - One of Planning, Economic IDA / D4970 Management and Livelihoods Prior Request for Bids Open - National 395,000.00 256,000.00 Completed 2020-05-17 2020-06-13 2020-05-22 2020-06-14 2020-07-03 2020-08-23 2020-08-02 2020-09-12 2020-09-06 2020-09-16 2021-03-05 2021-01-09 Envelope Development and Development Around Water International Cooperation, Points Ministry of Livestock & Animal Husbandry and Puntland Water Development Agency. SO-MOPIC - PL-173790-GO- RFQ / Purchase of Office Component 4: Project Equipments (Laptops, Management, M & E, Request for Single Stage - One Desktops, Projector, Printers, IDA / D4970 Prior Limited 56,000.00 40,797.75 Completed 2020-05-24 2020-06-26 2020-07-19 2020-08-29 2021-01-15 2020-10-06 Knowledge Management and Quotations Envelope and accessories) for Biyoole Learning Puntland Implementing agencies. Component 4: Project SO-MOPIC - PL-178199-GO- Management, M & E, Request for Single Stage - One RFQ / Hydrological Monitoring IDA / D4970 Prior Limited 18,000.00 16,990.00 Signed 2020-06-14 2020-11-10 2020-08-09 2020-11-28 2021-02-05 Knowledge Management and Quotations Envelope Equipment (GPS tools) Learning SO-MOPIC - PL-183182-GO- Component 3: Supporting RFB / 4x4WD Double Cabin Sustainable Land Single Stage - One Pickup Vehicles with its IDA / D4970 Management and Livelihoods Prior Request for Bids Open - National 150,000.00 112,700.00 Completed 2020-07-15 2020-07-22 2020-07-20 2020-07-27 2020-08-31 2020-09-16 2020-09-30 2020-10-03 2020-11-04 2020-10-13 2021-05-03 2021-04-03 Envelope Accessories for Mobile Development Around Water Veterinary Clinics Points SO-MOPIC - PL-185015-GO- Component 4: Project RFQ / Procurement of Office Management, M & E, Request for Single Stage - One IDA / D4970 Prior Limited 3,500.00 3,410.00 Completed 2020-07-28 2020-08-11 2020-09-22 2020-08-19 2021-03-21 2020-08-28 Furniture (tables, chairs, Knowledge Management and Quotations Envelope shelves etc.) for Puntland PIUs Learning Component 3: Supporting SO-MOPIC - PL-204178-GO- Sustainable Land Request for Single Stage - One RFQ / Purchase of Mobile IDA / D4970 Management and Livelihoods Prior Limited 49,908.00 54,683.20 Completed 2020-11-20 2020-12-23 2021-01-15 2021-01-18 2021-07-14 2021-02-21 Quotations Envelope veterinary clinics kits Development Around Water Points Page 1 SO-MOPIC - PL-214237-GO- Component 4: Project RFQ / Procurement of Management, M & E, Request for Single Stage - One Monitoring and Evaluation IDA / D4970 Prior Limited 8,000.00 8,506.30 Completed 2021-01-25 2021-02-16 2021-03-22 2021-03-04 2021-09-18 2021-03-08 Knowledge Management and Quotations Envelope equipment (drones, Learning smartphones, GPS, etc) SO-MOPIC - PL-219383-GO- Component 4: Project RFQ / Conference room Management, M & E, Request for Single Stage - One furniture for newly IDA / D4970 Prior Limited 14,140.00 19,959.47 Completed 2021-02-28 2021-03-01 2021-04-25 2021-03-21 2021-10-22 2021-05-10 Knowledge Management and Quotations Envelope constructed MoLAH's Learning Conference Hall SO-MOPIC - PL-226152-GO- RFQ / Procurement of Office Furniture (tables, chairs, Component 2. Institutional Request for Single Stage - One shelves etc.) for Puntland IDA / D4970 Post Limited 36,000.00 0.00 Canceled 2021-04-04 2021-05-30 2021-11-26 and Capacity Development Quotations Envelope Ministry of Environment, Agriculture and Climate Change. SO-MOPIC - PL-231286-GO- RFQ / Procurement of Office Furniture (tables, chairs, Component 2. Institutional Request for Single Stage - One shelves etc.) for Puntland IDA / D4970 Prior Limited 36,000.00 0.00 Canceled 2021-05-01 2021-06-26 2021-12-23 and Capacity Development Quotations Envelope Ministry of Environment, Agriculture and Climate Change. SO-MOPIC - PL-231558-GO- RFQ / Purchase of Office Equipments (Laptops, Desktops, Projector, Printers, Component 2. Institutional Request for Single Stage - One IDA / D4970 Prior Limited 22,825.00 24,985.80 Signed 2021-05-05 2021-05-10 2021-06-30 2021-06-03 2021-12-27 and accessories) for Puntland and Capacity Development Quotations Envelope Ministry of Environment, Agriculture and Climate Change. SO-MOPIC - PL-232799-GO- RFQ / Procurement of Office Furniture (tables, chairs, Component 2. Institutional Request for Single Stage - One shelves etc.) for Puntland IDA / D4970 Prior Limited 13,175.00 25,042.00 Signed 2021-05-10 2021-05-10 2021-07-05 2021-06-03 2022-01-01 and Capacity Development Quotations Envelope Ministry of Environment, Agriculture and Climate Change. SO-MOPIC - PL-235843-GO- Component 3: Supporting RFQ / Procurement of Sustainable Land Under Request for Single Stage - One Laboratory Kits for Puntland IDA / D4970 Management and Livelihoods Prior Limited 57,810.00 0.00 Implementati 2021-06-05 2021-06-13 2021-07-31 2022-01-27 Quotations Envelope Ministry of Livestock and Development Around Water on Animal Husbandry Points Component 3: Supporting SO-MOPIC - PL-240954-GO- Sustainable Land Under RFQ / Procurement of seeds Request for Single Stage - One IDA / D4970 Management and Livelihoods Prior Limited 15,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 and tools for fodder Quotations Envelope Development Around Water on production Points NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPIC - PL-169621-CS- CQS / Consulting Firm for Provision of continuous Component 1: Support the Consultant engineering support - Site IDA / D4970 Development of Multiple Use Prior Qualification International 213,150.00 300,000.00 Signed 2020-04-25 2020-05-12 2020-05-16 2020-05-20 2020-06-29 2020-07-21 2020-07-29 2020-09-18 2020-09-02 2020-09-19 2021-03-01 selection, surveying, Water Sources Selection designing & BOQs, bidding & Contracting SO-MOPIC - PL-224681-CS- Consultant CQS / Consultant Firm for Component 2. Institutional IDA / D4970 Prior Qualification Limited 50,000.00 0.00 Under Review 2021-03-26 2021-04-22 2021-04-09 2021-05-09 2021-06-13 2021-12-10 Developing 10 Community and Capacity Development Selection Investment Plans in Puntland. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Project Individual SO-MOPIC - PL-160036-CS- Management, M & E, IDA / D4970 Prior Consultant Limited 150,000.00 75,120.00 Signed 2020-02-24 2020-02-23 2020-02-29 2020-03-10 2020-03-21 2020-04-06 2020-04-25 2020-03-28 2021-02-28 INDV / Project Coordinator Knowledge Management and Selection Learning Component 4: Project SO-MOPIC - PL-160043-CS- Individual Management, M & E, INDV / Finance Management IDA / D4970 Prior Consultant Limited 90,000.00 50,775.00 Signed 2020-02-24 2020-03-09 2020-02-29 2020-03-10 2020-03-21 2020-04-06 2020-04-25 2020-03-28 2021-02-28 Knowledge Management and Specialist Selection Learning Component 4: Project Individual SO-MOPIC - PL-160039-CS- Management, M & E, IDA / D4970 Prior Consultant Limited 90,000.00 56,640.00 Signed 2020-02-24 2020-02-20 2020-02-29 2020-02-21 2020-03-21 2020-04-08 2020-04-25 2020-03-28 2021-02-28 INDV / Procurement Specialist Knowledge Management and Selection Learning Component 4: Project SO-MOPIC - PL-160034-CS- Individual Management, M & E, INDV / Environmental and IDA / D4970 Prior Consultant Limited 72,000.00 43,305.00 Signed 2020-02-24 2020-02-21 2020-02-29 2020-02-23 2020-03-21 2020-04-06 2020-04-25 2020-03-28 2021-02-28 Knowledge Management and Social Safeguards Specialist Selection Learning Page 2 Component 4: Project SO-MOPIC - PL-160042-CS- Individual Management, M & E, INDV / Monitoring and IDA / D4970 Prior Consultant Limited 90,000.00 43,305.00 Signed 2020-02-24 2020-02-20 2020-02-29 2020-02-23 2020-03-21 2020-04-07 2020-04-25 2020-03-28 2021-02-28 Knowledge Management and Evaluation Specialist Selection Learning Component 4: Project SO-MOPIC - PL-168511-CS- Individual Management, M & E, CDS / Senior Rangeland IDA / D4970 Prior Consultant Limited 43,200.00 93,990.00 Signed 2020-04-23 2020-04-26 2020-04-28 2020-05-06 2020-05-05 2020-05-07 2020-05-15 2020-05-09 2020-05-20 Knowledge Management and Specialist Consultant Selection Learning Component 4: Project SO-MOPIC - PL-168512-CS- Individual Management, M & E, CDS / Community IDA / D4970 Prior Consultant Limited 43,200.00 84,240.00 Signed 2020-04-23 2020-05-10 2020-04-28 2020-05-13 2020-05-05 2020-05-14 2020-05-15 2020-05-13 2020-05-20 Knowledge Management and Development Specialist Selection Learning Component 4: Project SO-MOPIC - PL-168513-CS- Individual Management, M & E, CDS / Senior institutional IDA / D4970 Prior Consultant Limited 48,000.00 98,160.00 Signed 2020-04-23 2020-04-29 2020-04-28 2020-05-09 2020-05-05 2020-05-11 2020-05-15 2020-05-09 2020-05-20 Knowledge Management and Development Advisor Selection Learning Component 4: Project SO-MOPIC - PL-168514-CS- Individual Management, M & E, CDS / Senior Water Engineer IDA / D4970 Prior Consultant Limited 48,000.00 92,880.00 Signed 2020-04-23 2020-05-10 2020-04-28 2020-06-03 2020-05-05 2020-06-09 2020-05-15 2020-06-03 2020-05-20 Knowledge Management and Consultant Selection Learning SO-MOPIC - PL-174621-CS- Component 1: Support the Individual INDV / 1st - Site Supervision IDA / D4970 Development of Multiple Use Prior Consultant Open 18,000.00 0.00 Canceled 2020-05-27 2020-05-27 2020-07-15 2020-08-05 2020-09-09 2021-03-08 Engineer Water Sources Selection SO-MOPIC - PL-175171-CS- Component 1: Support the Individual INDV / 2nd - Site Supervision IDA / D4970 Development of Multiple Use Prior Consultant Open 18,000.00 0.00 Canceled 2020-05-27 2020-05-27 2020-07-15 2020-08-05 2020-09-09 2021-03-08 Engineer Water Sources Selection SO-MOPIC - PL-175173-CS- Component 1: Support the Individual INDV / 3rd - Site Supervision IDA / D4970 Development of Multiple Use Prior Consultant Open 18,000.00 0.00 Canceled 2020-05-27 2020-05-27 2020-07-15 2020-08-05 2020-09-09 2021-03-08 Engineer Water Sources Selection SO-MOPIC - PL-175175-CS- Component 1: Support the Individual INDV / 4th - Site Supervision IDA / D4970 Development of Multiple Use Prior Consultant Open 18,000.00 0.00 Canceled 2020-05-27 2020-05-27 2020-07-15 2020-08-05 2020-09-09 2021-03-08 Engineer Water Sources Selection SO-MOPIC - PL-176299-CS- Component 1: Support the Individual INDV / 1st - Site Supervision IDA / D4970 Development of Multiple Use Prior Consultant Limited 18,000.00 18,000.00 Signed 2020-05-30 2020-05-31 2020-06-04 2020-06-25 2020-06-25 2020-06-29 2020-07-30 2020-08-01 2021-01-26 Engineer Water Sources Selection SO-MOPIC - PL-176300-CS- Component 1: Support the Individual INDV / 2nd - Site Supervision IDA / D4970 Development of Multiple Use Prior Consultant Limited 18,000.00 18,000.00 Signed 2020-05-30 2020-05-31 2020-06-04 2020-06-24 2020-06-25 2020-06-29 2020-07-30 2020-08-01 2021-01-26 Engineer Water Sources Selection SO-MOPIC - PL-176302-CS- Component 1: Support the Individual INDV / 3rd - Site Supervision IDA / D4970 Development of Multiple Use Prior Consultant Limited 18,000.00 18,000.00 Signed 2020-05-30 2020-05-31 2020-06-04 2020-06-25 2020-06-25 2020-06-29 2020-07-30 2020-08-01 2021-01-26 Engineer Water Sources Selection SO-MOPIC - PL-176303-CS- Component 1: Support the Individual INDV / 4th - Site Supervision IDA / D4970 Development of Multiple Use Prior Consultant Limited 18,000.00 18,000.00 Signed 2020-05-30 2020-05-31 2020-06-04 2020-06-25 2020-06-25 2020-07-08 2020-07-30 2020-08-01 2021-01-26 Engineer Water Sources Selection Component 3: Supporting SO-MOPIC - PL-214244-CS- Sustainable Land Individual INDV / Livestock Development IDA / D4970 Management and Livelihoods Prior Consultant Limited 39,840.00 39,840.00 Signed 2021-01-22 2021-02-11 2021-01-27 2021-03-01 2021-02-17 2021-03-03 2021-03-24 2021-03-04 2021-09-20 Specialists Development Around Water Selection Points Page 3 UNITED REPUBLIC OF TANZANIA Procurement Plan General 1. Project Information Country: Tanzania Project Name: Secondary Education Quality Improvement Program Project ID: P170480 2. Project Implementation Agency: President’s Office, Regional Administration and Local Government 3. Date of the Procurement Plan: December 5, 2019 4. Period Covered by this procurement plan: January 2020 to June 2021 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. III. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 1 When the Borrower uses its own national open competitive procurement arrangements as set forth in The Public Procurement Act, 2011, The Public Procurement (Amendment) Act, 2016, the Public Procurement Regulations, 2013 and the Public Procurement (Amendment) Regulations, 2016, such arrangements shall be subject to paragraph 5.3 and 5.4 of the Procurement Regulations and the following conditions: o Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts o There should be no mandatory requirements for inclusion of local experts and firms for the consulting assignments; o There should be no exclusive preference based on threshold prescribed in PPA and its Regulations; o Negotiations with the lowest evaluated bidder to reduce price in the case of goods, works and non-consulting services where competitive methods have been used shall not be allowed; o The fixed budget method shall not be used for goods, works and non- consulting services; o Established and approved procurement standards by the government may be used, provided that they are not restrictive When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.4(c) and 5.5 of the Procurement Regulations, the request for bids/request for proposals/request for quotations document shall require that Bidders/Proposers submitting Bids/Proposals/quotations present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. IV. Prequalification: Not Applicable V. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable VI. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable VII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable 2 Domestic preference is not applicable for National Open Competitive Procurement VIII. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Not Applicable IX. Other Relevant Procurement Information Not Applicable 3 X. Threshold for Prior Review, Procurement Approaches and Methods – Good, Works and Non-Consulting Services Procurement Approaches and Methods Prior (US$ millions) Review Category Open Open Request for (US$ millions) International National Quotation (RfQ) Works ≥ 10 ≥ 15 < 15 ≤ 0.2 Goods, IT, and non- ≥2 ≥5 <5 ≤ 0.1 consulting services Post Review: All contracts not subject to prior review shall be subject to post review. Summary of the procurement packages for Good, Works and Non-Consulting Services (Planned for the first 18 months after project effectiveness): XI. Thresholds for Prior Review, Selection Approaches and Methods – Consulting Services Category Prior Short List of National Consultants Review Consulting Engineering and Construction (US$ Services Supervision millions) Consultants ≥1 ≤ 0.3 ≤ 0.3 (Firms) Individual ≥ 0.3 n.a. n.a. Consultants Note: Consultancy services estimated to cost equivalent to US $ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or regional newspaper. 4 PROCUREMENT Tanzania : Tanzania Secondary Education Quality Improvement Project (SEQUIP) PLAN General Information Country: Tanzania Bank’s Approval Date of the Original Procurement Plan: 2021-05-24 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170480 GPN Date: 2021-06-09 Project Name: Tanzania Secondary Education Quality Improvement Project (SEQUIP) Loan / Credit No: IDA / 65340 P Executing Agency(ies): RESIDENT’S OFFICE- REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-PO-RALG-235742-GO- RFB / Procurement of 5 Motor Component 4: Project Pending Single Stage - One vehicles for Project IDA / 65340 Coordination, Monitoring and Post Request for Bids Open - National 570,000.00 0.00 Implementati 2021-07-26 2021-07-31 2021-08-21 2021-10-02 2021-11-06 2022-05-05 Envelope Coordination and Monitoring Evaluation on at PO -RALG TZ-PO-RALG-235746-GO- RFB / Procurement of Office Component 4: Project Pending Single Stage - One equipment (Desktop and IDA / 65340 Coordination, Monitoring and Post Request for Bids Open - National 150,000.00 0.00 Implementati 2021-07-26 2021-07-31 2021-09-11 2021-10-11 2021-11-15 2022-05-14 Envelope Laptops computers, Printers Evaluation on and Photocopies) TZ-PO-RALG-235750-GO- Component 4: Project Pending Request for Single Stage - One RFQ / procurement of IDA / 65340 Coordination, Monitoring and Post Limited 50,000.00 0.00 Implementati 2021-07-31 2021-09-25 2022-03-24 Quotations Envelope furniture and fittings Evaluation on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-PO-RALG-235766-CS- CQS / Consultancy services Component 4: Project Consultant for Under IDA / 65340 Coordination, Monitoring and Post Qualification Open - National 300,000.00 0.00 2021-05-25 2021-06-04 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 supervision/Implementation Implementation Evaluation Selection of the ESF instruments of the SEQUIP INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PPA PROCUREMENT PLAN I. General Project information: Niger Smart Villages for rural growth and digital inclusion, P167543 Project Implementation agency: UNITE DE GESTION DU PROJET (UGP) Agence Nationale de la Société d’Information (ANSI) UGP Transitoire: Public Sector Capacity and Performance for Service Delivery (PCDS) Date of the PPA Procurement Plan: November 16, 2018 Period covered by this Procurement Plan: The procurement period of project covered from November 2018 to August 2020. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and in August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Act 2011-37 of October 28, 2011 on the general principles, control and regulation of public procurement and delegations of public service in Niger and the Decree No. 2016- 1 641/PRN/PM of December 1, 2016 on the Public Procurement Code and delegations of public service, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts; e. contracts with an appropriate allocation of responsibilities, risks, and liabilities; f. publication of contract award information; g. rights for the Bank to review procurement documentation and activities; h. an effective complaints mechanism; and i. maintenance of records of the Procurement Process. Other national procurement arrangements (other than national open competitive procurement), that may be applied by the Borrower (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti- Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” 2 Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. “Not Applicable” 3 Activity Reference No. Procurement Review Procurement Market Estimated Amount Component /Description Category Type Method Approach (US$) CS-INDV-1 Selection of Préparation d’un Cadre de Gestion Components 1-5 Consultant Post Individual Open 100,000.00 Environnementaux et Sociaux (full project) Services Consultants (IC) (CGES) CS-INDV-2 Component 2 – Consultant Etude d’Evaluation des pilotes « Post IC Open 100,000.00 Rural Connectivity Services Villages Intelligents » CS-INDV-3 Component 1 – Etude réglementaire sur le partage Consultant Enabling Post IC Open 100,000.00 des infrastructures et le « Roaming Services Environment national » CS-INDV-4 Components 1-5 Post Open 50,000.00 Consultant (spécialiste ressources (full project) Consultant IC humaines) pour préparer des Services termes de références CS-INDV-5 Component 1 Post Open 100,000.00 Etude sur l’utilisation du Fond sur Enabling Consultant IC l’Accès Universel (FAU) Evironment Services CS-INDV-6 Components 1-5 Post Open 50,000.00 Consultant pour préparer le manuel (full project) Consultant IC de procédures pour le projet Services CS-INDV-7 Component 3 Post Open 100,000.00 Evaluation des besoins en Digital and Consultant infrastructures de paiements des Financial Inclusion IC Services différentes parties : Direction du Trésor, CAIMA, et autres 4 CS-FIRME-8 Component 2 Rural Post Quality Cost Open/National 300,000.00 Etude pour définir le modèle pour Connectivity Based Selection octroi des subventions (enchères (QCBS) Consultant inverses) : Préparation de Services documents pour l’appel aux offres / cahiers des charges et appui au processus CS-FIRME-9 Component 3 Post Consultant’s Open/National 200,000.00 Etude sur l’utilisation de l’argent Digital and Consultant Qualifications mobile dans les zones rurales Financial Inclusion Services Based Selection (CQS) CS-FIRME-10 Components 1-5 Post QCBS Open/National 300,000.00 Définition du concept d’un village (full project) Consultant intelligent, PPP, et programme de Services sensibilisation dans les villages CS-FIRME-11 Components 2 Post CQS Open/National 200,000.00 Etude sur les besoins numériques (Rural Consultant des camps refugies Connectivity) and 3 Services Digital and Financial Inclusion CS-FIRME-12 Components 1-5 Post Least Cost-based Open/National 50,000.00 Audit Externe (full project) Consultant Selection Services CS-INDV-13 Component 4 Post IC Open 50,000.00 Coordinateur UGP Project Consultant Management Services CS-INDV-14 Component 4 Post IC Open 40,000.00 Spécialiste, Passation des Marches Project Consultant Management Services CS-INDV -15 Component 4 Post IC Open 40,000.00 Spécialiste, gestion Financière Project Consultant Management Services CS-INDV-16 Component 4 Post IC Open 40,000.00 Spécialiste, Sauvegardes Project Consultant Environnementaux et Sociaux Management Services 5 CS-INDV-17 Component 4 Post IC Open 28,000.00 Spécialiste, Développement Rural Project Consultant Management Services CS-INDV-18 Component 4 Post IC Open 28,000.00 Spécialiste, Technologies Project Consultant Numérique Management Services CS-INDV-19 Component Post IC Open 28,000.00 Spécialiste, Finance inclusive / 4 Project Consultant Finance numérique Management Services CS-INDV-20 Component 4 Post IC Open 20,000.00 Assistant au coordinateur Project Consultant Management Services CS-INDV-21 Component 4 Post IC Open 20,000.00 Assistant, Passation des marches Project Consultant Management Services CS-INDV-22 Component 4 Post IC Open 20,000.00 Assistant, Gestion Financière Project Consultant Management Services Acquisition d’ordinateurs, de Component 4 Goods Post Request for Bids Open/National 200,000.00 vidéoprojecteurs, d’imprimantes et Project de mobiliers Management Acquisition de véhicule Component 4 Goods Post Request for Open/Limited 50,000.00 Project Quotations Management 6 PROCUREMENT Niger : Niger: Smart Villages for rural growth and digital inclusion PLAN General Information Country: Niger Bank’s Approval Date of the Original Procurement Plan: 2020-02-05 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167543 GPN Date: Project Name: Niger: Smart Villages for rural growth and digital inclusion Loan / Credit No: IDA / V2450, IDA / 66880 COORDINATION UNIT OF NIGER SMART VILLAGES PROJECT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 4. Strengthening project GS-2 / Transportation car for Request for Single Stage - One IDA / V2450 management and stakeholder Post Open - National 50,000.00 45,492.48 Signed 2019-11-20 2020-01-15 2019-09-26 2020-07-13 office Quotations Envelope capacity-building GS-1 / Acquistion 4. Strengthening project d'ordinateurs, video Request for Single Stage - One IDA / V2450 management and stakeholder Post Limited 100,000.00 0.00 Canceled 2020-03-04 2020-04-29 2020-10-26 projecteurs, imprimantes, Quotations Envelope capacity-building mobiliers de bureaux NE-PCU-SV-203071-GO-RFQ / Fourniture, Installation et Configuration des 4. Strengthening project Request for Single Stage - One équipements photovoltaïque IDA / V2450 management and stakeholder Post Limited 100,000.00 59,802.67 Signed 2020-11-18 2020-12-08 2021-01-13 2021-01-21 2021-07-12 Quotations Envelope pour l'alimentation de sites capacity-building VSAT et KITS WIFI pour le compte de l’ANSI NE-PCU-SV-209290-GO-RFQ / Fourniture, Installations et 4. Strengthening project Under Configurations des Request for Single Stage - One IDA / V2450 management and stakeholder Post Limited 30,000.00 24,346.33 Implementati 2020-12-23 2021-05-28 2021-02-17 2021-08-16 équipements de Visio- Quotations Envelope capacity-building on Conférence pour le compte du Projet Villages Intelligents. NE-PCU-SV-212558-GO-DIR / Fourniture, installation et 4. Strengthening project mise en service du logiciel de IDA / 66880 management and stakeholder Post Direct Selection Direct 50,000.00 33,234.68 Signed 2021-02-09 2021-02-04 2021-02-14 2021-01-27 2021-03-21 2021-03-17 2021-09-17 Gestion Comptable et capacity-building Financière intégré « Tom²Pro » GS-3 / Acquisition 01 Under véhicule 4x4 Station Wagon 2. Developing rural Request for Single Stage - One IDA / 66880 Post Open - National 200,000.00 0.00 Implementati 2021-03-03 2021-06-08 2021-04-28 2021-10-25 Tout Terrain et 01 véhicule connectivity Quotations Envelope on 4x4 Hard Top wc NE-PCU-SV-229729-GO-RFQ / Fourniture et installation de 4. Strengthening project Request for Single Stage - One matériels informatiques pour IDA / 66880 management and stakeholder Post Limited 60,000.00 48,010.44 Signed 2021-05-05 2019-11-20 2021-06-30 2019-12-02 2021-12-27 Quotations Envelope le compte du Projet Villages capacity-building Intelligents NE-PCU-SV-229731-GO-RFQ / Fourniture et installation de 4. Strengthening project Request for Single Stage - One mobilier de bureau pour le IDA / 66880 management and stakeholder Post Limited 20,000.00 17,167.58 Signed 2021-05-05 2019-11-04 2021-06-30 2019-11-15 2021-12-27 Quotations Envelope compte du projet villages capacity-building intelligents NE-PCU-SV-229733-GO-RFQ / Fourniture et installation 4. Strengthening project Request for Single Stage - One d'un groupe électrogène pour IDA / 66880 management and stakeholder Post Limited 40,000.00 33,379.02 Signed 2021-05-05 2019-11-29 2021-06-30 2019-12-17 2021-12-27 Quotations Envelope le compte du Projet villages capacity-building Intelligents NE-PCU-SV-239226-GO-RFQ / Acquisition complément matériels informatiques pour 4. Strengthening project Under Request for Single Stage - One UGP (ordinateurs portables , IDA / 66880 management and stakeholder Post Limited 15,000.00 0.00 Implementati 2021-06-23 2021-06-14 2021-08-18 2022-02-14 Quotations Envelope ordinateurs tout-en-un, capacity-building on licences anti virus, et accessoires ) NE-PCU-SV-239225-GO-RFB Pending 3. Improving digital financial Single Stage - One / Equipement de 50 centres IDA / 66880 Prior Request for Bids Open - International 3,000,000.00 0.00 Implementati 2021-07-20 2021-07-25 2021-09-05 2021-10-05 2021-11-09 2022-05-08 inclusion Envelope numériques en zones rurales on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NE-PCU-SV-185945-NC-RFP 4. Strengthening project / Recrutement d’un transitaire Request for Single Stage - One IDA / V2450 management and stakeholder Post Limited 20,000.00 17,997.05 Signed 2020-09-05 2020-08-24 2020-10-31 2020-10-16 2021-04-29 / cabinet de transit pour le Quotations Envelope capacity-building compte de l’ANSI CS-FIRME-13 / Cartographie 2. Developing rural Single Stage - One IDA / V2450 Post Request for Bids Open - National 170,000.00 0.00 Canceled 2020-08-31 2020-09-05 2020-10-17 2020-11-16 2020-12-21 2021-06-19 des 200 villages pilotes connectivity Envelope CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-FIRME-8 / Etude pour definir le modele dóctroi des subventions ( encheres 2. Developing rural Quality And Cost- Under inversees): Preparation de IDA / V2450 Post Open - National 300,000.00 0.00 2019-11-27 2020-02-24 2019-12-18 2020-01-31 2021-03-08 2020-02-28 2021-04-15 2020-03-29 2021-05-05 2020-05-03 2021-06-04 2020-06-07 2021-06-07 connectivity Based Selection Implementation documents pour l'appel d'offres / Cahiers des charges et appui au processus CS-FIRME-9 / Etude sur Consultant 3. Improving digital financial Under l'utilisation du Mobile money IDA / V2450 Post Qualification Open - National 200,000.00 223,321.14 2019-11-20 2020-02-24 2019-12-11 2020-01-24 2021-02-01 2020-02-23 2021-03-29 2020-03-29 2020-09-25 inclusion Implementation dans les zones rurales Selection Quality And Cost- Under CS-FIRME-12 / Audit externe IDA / V2450 1. Enabling environment Post Open - National 50,000.00 25,088.81 2020-03-16 2020-07-08 2020-04-06 2020-05-20 2021-03-05 2020-06-17 2021-03-25 2020-07-17 2021-03-30 2020-08-21 2021-04-30 2020-09-25 2021-09-25 Based Selection Implementation NE-PCU-SV-191268-CS-CQS / Sélection d’un cabinet de consultance charge d’élaborer Consultant un manuel d’exécution des 3. Improving digital financial IDA / V2450 Post Qualification Open - International 200,000.00 87,686.13 Signed 2020-10-02 2020-10-21 2020-10-23 2020-12-06 2021-03-20 2021-01-05 2021-03-20 2021-02-09 2021-05-07 2021-08-08 activités de la composante 3 inclusion Selection du PVI : (Inclusion financière et services financiers numériques). NE-PCU-SV-200538-CS-CQS / Étude des infrastructures Consultant des TIC’s au Niger et 2. Developing rural IDA / V2450 Post Qualification Open - International 170,000.00 168,351.88 Signed 2020-10-30 2020-11-04 2020-11-20 2021-01-03 2021-02-01 2021-02-02 2021-04-01 2021-03-09 2021-05-17 2021-09-05 Identification de 200 villages connectivity Selection pilotes pour la couverture large bande des zones rurales NE-PCU-SV-225496-CS- QCBS / Sélection d’un cabinet de consultants (Firme) pour 2. Developing rural Quality And Cost- Under une évaluation des IDA / V2450 Post Open - International 150,000.00 0.00 2021-03-23 2021-03-21 2021-04-13 2021-05-10 2021-05-27 2021-06-24 2021-07-24 2021-08-28 2021-10-02 2022-10-02 connectivity Based Selection Implementation infrastructures digitales de paiement et de traitement de données au Niger CS-FIRME-10 / Definition du concept d'un village Quality And Cost- intelligent, PPP, et Programme IDA / V2450 1. Enabling environment Post Open - National 300,000.00 0.00 Canceled 2019-12-19 2020-01-09 2020-02-22 2020-03-21 2020-04-20 2020-05-25 2020-06-29 2021-06-29 Based Selection de sensibilisation dans les villages CS-FIRME-11 / Etude sur les Consultant 2. Developing rural besoins numeriques des IDA / V2450 Post Qualification Open - National 200,000.00 0.00 Canceled 2020-01-08 2020-01-29 2020-03-13 2020-04-12 2020-05-17 2020-11-13 connectivity camps de refugies Selection NE-PCU-SV-161011-CS-CQS / Recrutement d'une firme Consultant chargée de l’élaboration des IDA / V2450 1. Enabling environment Post Qualification Open - International 60,000.00 0.00 Canceled 2020-03-23 2020-04-13 2020-05-27 2020-06-26 2020-07-31 2021-01-27 études préparatoires du Projet Selection Villages Intelligents. NE-PCU-SV-186068-CS- QCBS / Sélection d’un cabinet de consultance pour 3. Improving digital financial Quality And Cost- l’élaboration d’un Manuel IDA / V2450 Post Open - International 100,000.00 0.00 Canceled 2020-09-07 2020-01-06 2020-09-28 2020-11-11 2020-12-09 2021-01-08 2021-02-12 2021-03-19 2022-03-19 inclusion Based Selection d’exécution des activités relatives à l’inclusion financière numérique INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NE-PCU-SV-144372-CS- Individual INDV / Preparation d'un Cadre IDA / V2450 1. Enabling environment Post Consultant Open 100,000.00 44,118.70 Signed 2019-11-06 2020-02-24 2019-12-25 2019-04-30 2020-01-15 2019-05-16 2020-02-19 2020-06-12 2020-08-17 de Gestion Environnemental et Selection Social (CGES) CS-INDV-3 / Etude Individual reglementaire sur le partage Under IDA / V2450 1. Enabling environment Post Consultant Open 100,000.00 0.00 2019-12-02 2021-03-09 2020-01-20 2020-02-10 2020-03-16 2020-09-12 des infrastructure et le Implementation Selection "Roaming national" CS-INDV-5 / Etude sur Individual l'utilisation du Fond d'Acces IDA / V2450 1. Enabling environment Post Consultant Open 100,000.00 0.00 Canceled 2019-12-15 2020-02-24 2020-02-02 2020-02-23 2020-03-29 2020-09-25 Universel ( FAU) Selection CS-INDV-6 / Consultant pour Individual preparer le Manuel de IDA / V2450 1. Enabling environment Post Consultant Open 50,000.00 15,826.53 Signed 2019-11-20 2020-02-24 2020-01-08 2019-08-26 2020-01-29 2021-03-12 2020-03-04 2021-04-30 2020-08-31 Procedures du Projet Selection CS-INDV-7 / Evaluation des besoins en infrastrutures de Individual 3. Improving digital financial paiement des differentes IDA / V2450 Post Consultant Open 100,000.00 0.00 Canceled 2019-12-20 2020-02-07 2020-02-28 2020-04-03 2020-09-30 inclusion parties : Direction du Tresor, Selection CAIMA, etc.. CS-INDV-19 / Specialiste , 4. Strengthening project Individual Finance Inclusive et Finance IDA / V2450 management and stakeholder Post Consultant Open 40,000.00 33,063.48 Signed 2020-02-24 2020-05-22 2020-04-13 2021-01-22 2020-05-04 2021-01-25 2020-06-08 2021-01-26 2020-12-05 Numerique capacity-building Selection 4. Strengthening project Individual CS-INDV-14 / Specialiste, IDA / V2450 management and stakeholder Post Consultant Open 40,000.00 2,770.26 Signed 2020-02-28 2019-02-04 2020-04-17 2019-06-28 2020-05-08 2019-10-07 2020-06-12 2019-10-10 2020-12-09 Passation des Marches capacity-building Selection 4. Strengthening project Individual CS-INDV-22 / Assistant, Under IDA / V2450 management and stakeholder Post Consultant Open 20,000.00 0.00 2020-02-28 2020-12-11 2020-04-17 2020-05-08 2020-06-12 2020-12-09 Gestion Financiere Implementation capacity-building Selection Page 2 4. Strengthening project Individual CS-INDV-13 / IDA / V2450 management and stakeholder Post Consultant Open 50,000.00 3,676.16 Signed 2020-02-28 2018-10-01 2020-04-17 2019-04-15 2020-05-08 2019-06-25 2020-06-12 2019-06-29 2020-12-09 Coordonnateur UGP capacity-building Selection 4. Strengthening project Individual CS-INDV-15 / Specialiste, IDA / V2450 management and stakeholder Post Consultant Open 40,000.00 2,762.37 Signed 2020-02-28 2019-02-04 2020-04-17 2019-07-01 2020-05-08 2019-09-20 2020-06-12 2019-09-20 2020-12-09 Gestion Financiere capacity-building Selection 4. Strengthening project Individual CS-INDV-20 / Assisstant IDA / V2450 management and stakeholder Post Consultant Open 20,000.00 0.00 Canceled 2020-02-28 2020-12-11 2020-04-17 2020-05-08 2020-06-12 2020-12-09 Coordonnateur capacity-building Selection 4. Strengthening project Individual CS-INDV-21 / Assisstant, Under IDA / V2450 management and stakeholder Post Consultant Open 20,000.00 1,365.70 2020-02-28 2020-12-23 2020-04-17 2021-06-02 2020-05-08 2021-06-18 2020-06-12 2020-12-09 Passation des marches Implementation capacity-building Selection 4. Strengthening project Individual CS-INDV-23 / Comptable IDA / V2450 management and stakeholder Post Consultant Open 28,000.00 1,988.91 Signed 2020-02-24 2019-02-04 2020-04-13 2019-06-28 2020-05-04 2019-09-20 2020-06-08 2019-09-20 2020-12-05 Principal capacity-building Selection CS-INDV-16 / Specialiste, 4. Strengthening project Individual Sauvegardes Environnnmt et IDA / V2450 management and stakeholder Post Consultant Open 40,000.00 2,781.59 Signed 2020-02-28 2019-02-21 2020-04-17 2019-07-19 2020-05-08 2019-09-17 2020-06-12 2019-09-20 2020-12-09 Sociales capacity-building Selection NE-PCU-SV-161008-CS- 4. Strengthening project Individual INDV / Recrutement d'un IDA / V2450 management and stakeholder Post Consultant Open 40,000.00 2,394.05 Signed 2020-02-28 2020-07-08 2020-04-17 2021-04-13 2020-05-08 2021-05-02 2020-06-12 2021-05-18 2020-12-09 spécialiste en paiement capacity-building Selection numérique CS-INDV-4 / Consultant ( Individual Under Expert TDRS) pour préparer IDA / V2450 1. Enabling environment Post Consultant Open 50,000.00 0.00 2019-12-05 2021-03-01 2020-01-23 2020-02-13 2020-03-19 2020-09-15 Implementation des termes de référence Selection NE-PCU-SV-161006-CS- INDV / Recrutement d’un consultant individuel pour 4. Strengthening project Individual Under élaborer la Stratégie de IDA / V2450 management and stakeholder Post Consultant Open 40,000.00 13,792.81 2020-03-16 2020-05-22 2020-05-04 2020-02-17 2020-05-25 2021-02-22 2020-06-29 2020-12-26 Implementation Passation des Marches du capacity-building Selection Projet Villages Intelligents (PPSD). 4. Strengthening project Individual CS-INDV-24 / Specialiste en IDA / V2450 management and stakeholder Post Consultant Open 30,000.00 2,788.44 Signed 2020-05-22 2020-07-08 2020-07-10 2021-03-15 2020-07-31 2021-05-14 2020-09-04 2021-06-15 2021-03-03 Suivi-Evaluation capacity-building Selection 4. Strengthening project Individual CS-INDV-18 / Specialiste, IDA / V2450 management and stakeholder Post Consultant Open 40,000.00 2,712.53 Signed 2020-05-22 2020-07-08 2020-07-10 2021-03-03 2020-07-31 2021-03-23 2020-09-04 2021-03-23 2021-03-03 Technologies Numeriques capacity-building Selection NE-PCU-SV-203313-CS- INDV / Recrutement d’un (e) 4. Strengthening project Individual consultant (e) individuel (le) IDA / V2450 management and stakeholder Post Consultant Limited 25,000.00 17,102.43 Signed 2020-11-13 2020-12-23 2020-11-18 2021-03-08 2020-12-09 2021-03-25 2021-01-13 2021-03-31 2021-07-12 pour la mise en place du site capacity-building Selection Web institutionnel du Projet Villages Intelligents. NE-PCU-SV-209288-CS- 4. Strengthening project Individual Under INDV / Recrutement d’un (e) IDA / V2450 management and stakeholder Post Consultant Open 40,000.00 0.00 2020-12-18 2020-12-23 2021-02-05 2021-02-26 2021-04-02 2021-09-29 Implementation Auditeur (e) Interne capacity-building Selection CS-INDV-30 / Spécialiste de 4. Strengthening project Individual la Prospective et du Under IDA / 66880 management and stakeholder Post Consultant Open 40,000.00 0.00 2021-02-26 2021-02-26 2021-04-16 2021-05-07 2021-06-11 2021-12-08 Développement des Usages Implementation capacity-building Selection Numériques (SPDUN) CS-INDV-31 / Spécialiste des 4. Strengthening project Individual Under Systèmes d’Information et du IDA / 66880 management and stakeholder Post Consultant Open 40,000.00 0.00 2021-02-26 2021-02-26 2021-04-16 2021-05-07 2021-06-11 2021-12-08 Implementation Numérique (SSIN) capacity-building Selection CS-INDV-25 / Etude sur la Individual Under gouvernance du Fonds d' IDA / V2450 1. Enabling environment Post Consultant Open 20,000.00 0.00 2021-05-14 2021-05-16 2021-07-02 2021-07-23 2021-08-27 2022-02-23 Implementation Acces Universel (FAU) au Niger Selection Individual CS-INDV-26 / Charge de Under IDA / 66880 1. Enabling environment Post Consultant Limited 10,000.00 0.00 2021-05-20 2021-05-19 2021-05-25 2021-06-03 2021-06-15 2021-07-20 2022-01-16 Communication Implementation Selection CS-INDV-2 / Etude Individual 2. Developing rural d'Evaluation des pilotes IDA / V2450 Post Consultant Open 100,000.00 0.00 Canceled 2019-12-02 2020-01-20 2020-02-10 2020-03-16 2020-09-12 connectivity "Villages Intelligents Selection Page 3 Viet Nam: Investing and Innovating for Grassroots Service Delivery Reform PROJECT Procurement Plan (as of February 20, 2019) 1. Project information: Country: Viet Nam Borrower/Recipient: Socialist Republic of Viet Nam Project Name: Investing and Innovating for Grassroots Service Delivery Reform Project Project ID No: P161283 Project Implementing Agency: MoH and participating provinces 2. Bank’s approval date of the Procurement Plan • Original Plan: at project negotiation. • First Revision: … 3. Date of General Procurement Notice: …. 4. Period covered by this procurement plan: the first 18 months implementation I. Works and Goods and Non-Consultant Services: 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Category thresholds Applicable (in US$ Remarks thresholds Remarks equivalent (in US$) ) Works RFB through ≥ 20 million – Above US$ 10 Open million International market approach RFB through ≥ 200,000 – Above US$ 10 Open National < 20 million million market approach Request for < 200,000 – None Quotation Direct None No threshold; Same as for Selection meet competitive requirements selection 1 of regulations 7.13-7.15 Goods and Non-Consulting Services RFB through ≥ 3 million – Above US$ 2 Open million International market approach RFB through ≥ 100,000 - Above US$ 2 Open National < 3 million million market approach Request for < 100,000 None Quotation Direct None No threshold; Same as for Selection meet competitive requirements selection of regulations 7.13-7.15 2. Prequalification. Not expected for the works/goods packages. 3. Any Other Special Procurement Arrangements: National procurement procedures as specified under paragraph 5.4 of the Procurement Regulations and the conditions specified in Annex 1 to this Procurement Plan 4. Leased assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. 5. Procurement of second hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable. 6. Hands-on Expanded Implementation Support (HEIS) as specified under paragraph 3.10 and 3.11 of the Procurement Regulations: Not applicable. 7. Procurement packages for Goods (prior and post reviews) with method and Time Schedule Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Bac Can - construction of CHSs in Lowest Ngoc Phai, W_1_BC 440 RFB Post Q3 2020 National Evaluate Quang Bach d Cost commune (Cho Don District) 2 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Bac Can - Renovation of Lowest W_2_BC 5 CHSs in 286 RFB Post Q2 2020 National Evaluate Ngan Son d Cost District Bac Can - Lowest Renovation of W_3_BC 158 RFQ Post Q3 2020 National Evaluate 3 CHSs in Na d Cost Ri District Ha Giang - construction of CHSs in Lowest W_1_H Ngam La, 704 RFB Post Q3 2020 National Evaluate G Sung Thai d Cost (Yen Minh District) Ha Giang - - Lowest W_2_H Renovation of 440 RFB Post Q2 2020 National Evaluate G 5 CHSs in Meo d Cost Vac District Ha Giang - - Renovation of Lowest W_3_H 3 CHSs in 528 RFB Post Q3 2020 National Evaluate G Quan Ba d Cost District Son La - construction Lowest W_1_SL of 4 CHSs in 880 RFB Post Q2 2020 National Evaluate Thuan Chau d Cost District Son La - construction Lowest W_2_SL of 4 CHSs in 880 RFB Post Q3 2020 National Evaluate Luc Yen d Cost District Yen Bai- construction of CHSs in Lowest Lang Nhi, Ta W_1_YB 540 RFB Post Q3 2020 National Evaluate Xi Lang d Cost communes (Tram Tau District) Yen Bai - Lowest Renovation of W_2_YB 265 RFB Post Q2 2020 National Evaluate 4 CHSs in Yen d Cost Binh District Yen Bai - Lowest Renovation of W_3_YB 735 RFB Post Q3 2020 National Evaluate 4 CHSs in Luc d Cost Yen District 3 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Hoa Binh - construction of CHS in Tan Lowest W_1_HB Son 364 RFB Post Q3 2020 National Evaluate Commune in d Cost Mai Chau District Hoa Binh - Lowest Renovation of W_2_HB 440 RFB Post Q2 2020 National Evaluate 3 CHSs in Mai d Cost Chau District Hoa Binh - Lowest Renovation of W_3_HB 295 RFB Post Q3 2020 National Evaluate 3 CHSs in Da d Cost Bac District Quang Binh - construction of 2 CHSs in Lowest W_1_Q Tan Trach, 140 RFQ Post Q3 2020 National Evaluate B Thuong Trach d Cost communes in Bo Trach District Quang Binh - Renovation of Lowest W_2_Q 4 CHSs in 194 RFQ Post Q2 2020 National Evaluate B Quang Ninh d Cost District Quang Binh - Renovation of Lowest W_3_Q 3 CHSs in 195 RFQ Post Q3 2020 National Evaluate B Quang Trach d Cost District Quang Tri - construction of 2 CHSs in Lowest Cam Tuyen, W_1_QT 300 RFB Post Q3 2020 National Evaluate Cam Chinh d Cost communes in Cam Lo District Quang Tri - Renovation of Lowest W_3_QT 3 CHSs in 466 RFB Post Q2 2020 National Evaluate Vinh Linh d Cost District Quang Ngai - construction Lowest W_1_Q of 3 CHSs in 660 RFB Post Q2 2020 National Evaluate B Binh Son d Cost District 4 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Quang Ngai - Renovation of Lowest W_1_Q 3 CHSs in 352 RFB Post Q2 2020 National Evaluate N Quang Ninh d Cost District Quang Ngai - Lowest W_2_Q Renovation of 264 RFB Post Q3 2020 National Evaluate N 3 CHSs in Tra d Cost Bong District Ninh Thuan - construction of CHS in Lowest W_1_NT Phuong Hai 119 RFQ Post Q3 2020 National Evaluate communes in d Cost Ninh Hai District Ninh Thuan - Renovation of Lowest W_2_NT 4 CHSs in 185 RFQ Post Q2 2020 National Evaluate Thuan Nam d Cost District Bac Lieu - construction of CHS in Lowest Long Dien W_1_BL 264 RFB Post Q3 2020 National Evaluate Dong A d Cost commune in Dong Hai District Bac Lieu - Lowest Renovation of W_2_BL 132 RFQ Post Q2 2021 National Evaluate 2 CHSs in Hoa d Cost Binh District Tra Vinh - construction of 2 CHSs in Lowest W_1_TV Ham Giang, 380 RFB Post Q2 2020 National Evaluate Kim Son d Cost communes in Tra Cu District Tra Vinh - Lowest Renovation of W_2_TV 332 RFB Post Q2 2020 National Evaluate 4 CHSs in Cau d Cost Ngang District Hau Giang - construction Lowest W_1_H of CHS in Mai 704 RFB Post Q3 2020 National Evaluate G Dam town in d Cost Chau Thanh District 5 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Hau Giang - Renovation of Lowest W_2_H 4 CHSs in 372 RFB Post Q2 2020 National Evaluate G Long My d Cost District Long An - construction Lowest W_1_LA of 3 CHSs in 572 RFB Post Q2 2020 National Evaluate Tan Hung d Cost District Long An - Lowest Renovation of W_2_LA 334 RFB Post Q2 2020 National Evaluate 4 CHSs in Moc d Cost Hoa District Long An - Lowest Renovation of W_3_LA 202 RFB Post Q3 2020 National Evaluate 3 CHSs in Ben d Cost Luc District Total Works 12,758 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 GeneXpert equipment Ha Giang - G_1_HG GeneXpert 34.29 DS Post Q3 2020 DS NA equipment Ye Bai - 34.29 G_1_YB GeneXpert DS Post Q3 2020 DS NA equipment Hoa Binh - 68.57 G_1_HB GeneXpert DS Post Q3 2020 DS NA equipment Quang Binh - 102.86 G_1_QB GeneXpert DS Post Q3 2020 DS NA equipment Quang Tri - 102.86 G_1_QT GeneXpert DS Post Q3 2020 DS NA equipment Quang Ngai - 205.71 G_1_QN GeneXpert DS Post Q3 2020 DS NA equipment 6 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 Ninh Thuan - 137.14 G_1_NT GeneXpert DS Post Q3 2020 DS NA equipment Bac Lieu - 102.86 G_1_BL GeneXpert DS Post Q3 2020 DS NA equipment Tra Vinh - 137.14 G_1_TV GeneXpert DS Post Q3 2020 DS NA equipment Hau Giang - G_1_Hu 68.57 GeneXpert DS Post Q3 2020 DS NA G equipment Long An - 205.71 G_1_LA GeneXpert DS Post Q3 2020 DS NA equipment Total GE 1,200 Vaccine Cold Chain equipment Bac Can - 77.89 G_2_BC Vaccine Cold DS Post Q3 2020 DS NA Chain Ha Giang - 168.38 G_2_HG Vaccine Cold DS Post Q3 2020 DS NA Chain Son La - 148.91 G_2_SL Vaccine Cold DS Post Q3 2020 DS NA Chain Yen Bai - 103.09 G_2_YB Vaccine Cold DS Post Q3 2020 DS NA Chain Hoa Binh - 126.00 G_2_HB Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Binh - 68.73 G_2_QB Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Tri - 59.56 G_2_QT Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Ngai - 95.07 G_2_QN Vaccine Cold DS Post Q3 2020 DS NA Chain Ninh Thuan - 27.49 G_2_NT Vaccine Cold DS Post Q3 2020 DS NA Chain Bac Lieu - 27.49 G_2_BL Vaccine Cold DS Post Q3 2020 DS NA Chain Tra Vinh - 45.82 G_2_TV Vaccine Cold DS Post Q3 2020 DS NA Chain 7 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 Hau Giang - G_2_Hu 13.75 Vaccine Cold DS Post Q3 2020 DS NA G Chain Long An - 37.80 G_2_LA Vaccine Cold DS Post Q3 2020 DS NA Chain Total VCC 1,000 DS Post Q3 2020 DS NA Total Works and 14,958 Goods 8 II. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Category Applicable thresholds thresholds (in US$ Remarks Remarks (in US$, equivalent millions) ) QCBS, QBS, ≥ 300,000 Shortlist of only ≥ 1.0 million FBS, LCS National (Using the Consultants most (Firms) for appropriate contract agreed market in the PP approach) CQS (Open or < 300,000 QCBS, QBS, FBS, None limited LCS) can be competition applied for through contracts with national or value under international $300,000 market approach, specified in the PP and agreed with the Bank. Direct None No threshold; Same as for Selection of meet competitive firms requirements of selection regulations 7.13- 7.15 Individual N/A Essential ≥ 300,000 depending individual and for the Consultants on nature of assignments will positions as services be defined in the specified in Procurement the PP agreed Plan agreed with with the Bank the Bank and in line with regulations 7.34- 7.39 using the most appropriate market approach 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 500,000 equivalent per contract, may comprise entirely of national consultants in 9 accordance with the provisions of paragraph 7.1, Section VII of the Procurement Regulations. 3. Consultancy Assignments with Selection Methods and Time Schedule Consulting Services Expecte Estimate Selecti d Revie Market Ref. Description of d Cost on Proposa Remar w by approa No. Assignment (US$ Metho l k Bank ch 1000) d Submiss ion Time B. Component 2 Post Training need assessment, development 12 and revisions of C_2b_ Nationa months professional 24 IC Post Q1 2020 1 l in 3 and years management training material C_2b_ IEC and Health Nationa 200 CQS Post Q1 2020 1 promotion l Development of the Balanced 6 C_2c_ Score cards - Nationa months 12 IC Post Q1 2020 1 health l in 1 system/public year health expert Development of 6 C_2c_ the Balanced Nationa months 12 IC Post Q1 2020 2 Score cards - l in 1 clinical expert year C. Component 3 Development of decree on functions and responsibilities of District 5 man- C_3a_ Health Center Nationa months 25 CQS/IC Post Q2 2020 1 (that cover l in a Regional clinic year and CHS) for primary health care at grassroot level Evidence for tracer conditions in the project to 5 man- C_3a_ provide inputs Nationa months 25 CQS/IC Post Q2 2020 2 for l in a development of year guidelines for Primary Healthcare at 10 commune level (to replace Decision 2919/QD-BYT International Experience on e-learning for continuous training, to 3 man- C_3a_ provide inputs Nationa months 15 CQS/IC Post Q3 2020 3 for the l in 6 development of months new decree replacing decree 22/2013/TT-BYT Development and supervision of the implementation 36 of electronic man- C_3b_ health record Nationa 500 QCBS Post Q3 2020 month 1 module at l in 5 commune level years (trans district- commune), balanced score card software Design and pilot C_3b_ implementation Nationa 25 CQS/IC Post Q2 2021 2 of community l health screening Design and C_3b_ implementation Nationa 6 25 CQS/IC Post Q4 2020 3 of tools for l months clinical decision C_3b_ Nationa 6 Quality service 25 CQS/IC Post Q2 2021 4 l months C_3d_ Auditing Nationa 50 CQS Post Q2 2021 1 Service l C_3d_ Nationa Coordinator 36 IC Post Q1 2020 2 l C_3d_ Nationa Planning Expert 27 IC Post Q1 2021 3 l C_3d_ Disbursement Nationa 27 IC Post Q1 2022 4 Expert l C_3d_ Nationa FM expert 27 IC Post Q1 2023 5 l C_3d_ Procurement Nationa 27 IC Post Q1 2024 6 Expert l Total consulting services 1,082 Total Works, Goods and Consulting 16,040 Services 11 12 Annex 1 - Additional National Procurement Provisions. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 1. Open Competitive Procurement: When the Recipient uses its own national open competitive procurement arrangements as set forth in (a) Article 20 on Open Bidding of the Recipient’s Law on Procurement No. 43/2013/QH13 dated November 26, 2013 and related provisions necessary to effect the same; and (b) the Recipient’s Decree No. 63/2014/ND-CP dated June 26, 2014 Guiding Implementation of the Law on the Procurement (collectively, “National Procurement Laws”), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (i) No domestic preference over foreign bidders shall be granted to national bidders in bid evaluation, nor shall foreign bidders be asked or required to form joint ventures with or be subcontractors to national bidders in order to submit a bid. (ii) The model bidding documents (harmonized model bidding documents) agreed with the Association shall be used. (iii) No bid shall be eliminated from detailed evaluation on the basis of minor, non-substantive deviations. The evaluation of bidder’s qualifications shall be conducted separately subsequent to the technical and commercial evaluation of the bid. (iv) A bidder shall neither be required nor permitted, as a condition for award, to undertake obligations not specified in the bidding documents or otherwise to modify the bid as originally submitted. (v) No bid shall be rejected on the basis of a comparison with the employer’s estimate and budget ceiling. (vi) The Recipient shall implement an effective mechanism allowing bidders to complaint and have their complaints handled in a timely manner. The complaints mechanism shall allow the submission of anonymous complaints. 13 PROCUREMENT Vietnam : Investing and Innovating for Grassroots Health Service Delivery PLAN General Information Country: Vietnam Bank’s Approval Date of the Original Procurement Plan: 2020-09-22 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161283 GPN Date: 2020-09-14 Project Name: Investing and Innovating for Grassroots Health Service Delivery Loan / Credit No: IDA / 64390 T Executing Agency(ies): ra Vinh Provincial Project Management Unit for GSD WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned TV-C1-XL1: / Building and I mproving, upgrading commun e health satations in Tra Vinh province, phase 1 - Lot 01: "An Trưong A and N Component 1: Upgrading of Single Stage - One 2021-04- hi Long" IDA / 64390 Post Request for Bids Open - National 1,251,289.00 989,449.38 Signed 2020-09-25 2020-11-06 2020-09-30 2020-11-09 2020-10-30 2020-12-10 2020-11-13 2020-12-22 2020-11-27 2021-02-02 CHS Infrastructure Envelope 26 - Lot 02: "Long Hoa" - Lot 03: "Long Hiep and An Q uang Huu" - Lot 04: "Binh Phu and Đuc M y" TV-C1-XL2 / Xây dựng TYT x Request for Bids - ã Hưng Mỹ, TYT xã Lương Hòa Under Component 1: Upgrading of Single Stage - One Small Works SPD 2022-08- A huyện Châu Thành và TYT x IDA / 64390 Post Request for Bids Open - National 603,182.00 0.00 Implementat 2021-06-10 2021-06-24 2021-06-15 2021-07-17 2021-08-16 2021-09-05 CHS Infrastructure Envelope (1 envelope 21 ã Mỹ Long Bắc huyện Cầu Nga ion process) ng TV-C1-XL3 / Xây dựng TYT x Request for Bids - Under ã Hàm Giang, TYT xã Kim Sơn Component 1: Upgrading of Single Stage - One Small Works SPD 2022-08- IDA / 64390 Post Request for Bids Open - National 413,158.00 0.00 Implementat 2021-06-10 2021-06-24 2021-06-15 2021-07-17 2021-08-16 2021-09-05 huyện Trà Cú và TYT xã Phú C CHS Infrastructure Envelope (1 envelope 21 ion ần huyện Tiểu Cần process) LÔ 02, GÓI THẦU TV-C1-XL1 / Lô 02 TV-C1-XL01.02: Xây mới Trạm Y tế xã Long Hòa, h Request for Bids - Under uyện Châu Thành, thuộc Gói t Component 1: Upgrading of Single Stage - One Small Works SPD 2021-12- IDA / 64390 Post Request for Bids Open - National 262,507.00 0.00 Implementat 2021-05-24 2021-05-24 2021-05-25 2021-06-25 2021-07-05 2021-07-19 hầu TV-C1-XL1: Xây dựng và CHS Infrastructure Envelope (1 envelope 16 ion nâng cấp sửa chữa các Trạm Y process) tế trên địa bàn tỉnh Trà Vinh đ ợt 1 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Procurement Plan (Text Part) Bangladesh Insurance Sector Development Project (BISDP) Project information: (i) Country: Bangladesh (ii) Project Name: Bangladesh Insurance Sector Development Project (BISDP) (iii) P-Number: P156823 Project Implementation agency: Insurance Development and Regulatory Authority (IDRA) Period covered by this Procurement Plan: Entire Project Period 1. Preamble The Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. 2. Prior Review Thresholds Procurement Prior Review Thresholds (US$ millions) Type of Substantial High risk Moderate risk Low risk Procurement risk Works (including turnkey, supply & installation of plant 5 10 15 20 and equipment, and PPP) Goods, information technology and 1.5 2 4 6 non-consulting services Consulting services: 0.5 1 2 4 firms Consulting services: 0.2 0.3 0.4 0.5 individuals Notes: 1. These thresholds apply to all procurement activities regardless of their procurement/selection methods. There is no automatic requirement to undertake prior review for direct selection for value less than these thresholds. Consultant services covers a range of services that are of an advisory or professional nature. 2. Use of Standard Procurement Documents: For all procurements under the project, the Bank’s Standard Procurement Documents (or other documents agreed with the Bank) shall be used; 3. Request for Bids (Open-National) will be carried out under the Bank Procurement Guidelines following procedures for Open Tendering Method (OTM) of the People’s Republic of Bangladesh (Public Procurement Act, 2006 – PPA, 2006 and The Public Procurement Rules, 2008 – PPR, 2008 using standard bidding documents satisfactory to the Bank. For the purpose of Request for Bids (Open-National) the following shall apply: a. Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; b. Bids should be submitted and opened in public in one location immediately after the deadline for submission; c. Lottery in award of contracts shall not be allowed; d. Bidders’ qualification/experience requirement shall be mandatory; e. Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost and contract award shall be based on the lowest evaluated bid price of compliant bid from eligible and qualified bidder; and f. Single stage two (2) envelope procurement system shall not be allowed. 2. Prequalification. Not Applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable. 4. Reference to (if any) Project Operational/Procurement Manual: Not Applicable 5. Any Other Special Procurement Arrangements: Not Applicable. 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Any Other Special Selection Arrangements: Not Applicable. PROCUREMENT Bangladesh : Bangladesh Insurance Sector Development Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-01-09 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156823 GPN Date: 2019-04-03 Project Name: Bangladesh Insurance Sector Development Project Loan / Credit No: / , IDA / 59720 I Executing Agency(ies): nsurance Development and Regulatory Authority WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G1-1 / IT & Supporting Project Implementation, Single Stage - One / Post Request for Bids Open - National 80,000.00 52,937.96 Signed 2017-04-05 2019-02-01 2017-04-10 2017-05-01 2019-02-16 2017-05-31 2019-03-14 2017-07-12 2019-04-30 2017-10-10 Equipment : Office Equipment Management, and Monitoring Envelope Project Implementation, Single Stage - One G1-2 / Furniture & Fixture IDA / 59720 Post Request for Bids Open - National 60,000.00 12,390.56 Signed 2019-03-15 2019-04-11 2019-04-04 2019-05-24 2019-05-06 2019-06-23 2019-05-09 2019-08-04 2019-05-22 2019-11-02 Management, and Monitoring Envelope Project Implementation, Single Stage - One G1-3 / IT Equipment IDA / 59720 Post Request for Bids Open - National 100,000.00 26,521.42 Signed 2019-02-25 2019-04-10 2019-03-12 2019-05-01 2019-04-30 2019-05-31 2019-05-08 2019-07-12 2019-05-21 2019-10-10 Management, and Monitoring Envelope Improving the Capacity of the G5 / Distance learning center Insurance Development and Single Stage - One with Videoconference and IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 600,000.00 377,300.03 Signed 2020-04-11 2019-11-21 2020-05-01 2020-07-05 2019-12-17 2020-09-13 2020-01-27 2020-10-25 2020-03-02 2021-01-23 Envelope audio visual facilities and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening G2-2-1 / Supply and and Increasing the Efficiency Single Stage - One IDA / 59720 Post Request for Bids Open - National 225,000.00 231,284.43 Signed 2019-04-14 2019-04-09 2019-04-19 2019-05-10 2019-04-29 2019-05-20 2019-06-09 2019-06-24 2019-05-20 2019-08-08 installation of IT equipment of the State-owned Insurance Envelope Corporations Improving the Capacity of the Insurance Development and G3-1 / Modernization Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 500,000.00 235,182.08 Signed 2019-12-24 2019-12-12 2019-12-25 2020-01-08 2020-01-08 2020-02-10 2020-02-12 2020-03-19 2020-06-03 2020-06-15 Classroom Envelope and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development and G15 / Supply of Training Request for Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Limited 6,250.00 5,727.23 Signed 2020-01-21 2019-06-10 2020-02-14 2019-06-16 2020-02-29 Materials (Bag) Quotations Envelope and the Bangladesh Insurance Academy ( BIA) G16 / Supply and Installation Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 6,250.00 5,817.07 Signed 2020-01-26 2019-08-07 2020-02-19 2019-08-22 2020-02-22 of IT Accessories for BISDP Management, and Monitoring Quotations Envelope G18 / Supply of Computer, Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 6,000.00 5,674.26 Signed 2020-01-21 2018-10-10 2020-02-16 2018-10-17 2020-03-07 Laptop, Printer and UPS Management, and Monitoring Quotations Envelope G19 / Supply of Digital Giant Project Implementation, Request for Single Stage - One screen / LED Television, IDA / 59720 Post Limited 6,200.00 5,837.30 Signed 2020-01-24 2019-03-21 2020-02-14 2019-03-27 2020-03-15 Management, and Monitoring Quotations Envelope Camera and Accessories G20 / Supply of Photocopier Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 6,150.00 5,791.98 Signed 2020-01-26 2019-01-17 2020-02-21 2019-01-23 2020-03-27 and Tablet Management, and Monitoring Quotations Envelope G21 / Supply of Furniture and Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 6,200.00 5,871.81 Signed 2020-02-27 2019-09-10 2020-03-31 2019-09-19 2020-05-30 Fixture Management, and Monitoring Quotations Envelope Improving the Capacity of the G2-2-2 / Supply and Insurance Development and Single Stage - One Installation of Computers and IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 941,000.00 776,334.81 Signed 2020-03-16 2020-03-19 2020-03-17 2020-04-14 2020-10-11 2020-04-21 2020-06-25 2020-05-19 2020-09-29 2020-06-28 Envelope Accessories and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the G6 / Development and Insurance Development and Single Stage - One Implementation of Interactive IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 600,000.00 0.00 Canceled 2020-11-10 2020-11-28 2021-01-09 2021-04-02 2021-05-14 2021-11-10 Envelope Portal and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development and G7-1 / Online approval of Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - International 500,000.00 0.00 Canceled 2020-11-15 2020-12-16 2021-02-04 2021-05-15 2021-06-26 2022-02-21 agents Envelope and the Bangladesh Insurance Academy ( BIA) G7-2 / Certification of Project Implementation, Single Stage - One IDA / 59720 Post Request for Bids Open - International 500,000.00 0.00 Canceled 2020-12-29 2021-01-30 2021-03-25 2021-06-23 2021-08-04 2022-04-01 employers of agents & Management, and Monitoring Envelope brokers Improving the Capacity of the G10-1 / Business Intelligence Insurance Development and Single Stage - One and data analytics at IDRA & IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - International 1,600,000.00 0.00 Canceled 2020-12-07 2021-01-12 2021-03-07 2021-06-07 2021-07-19 2022-01-15 Envelope BIA and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development and G13 / Motor road accident Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 700,000.00 0.00 Canceled 2020-11-10 2020-12-02 2021-01-21 2021-03-22 2021-05-03 2021-08-31 database Envelope and the Bangladesh Insurance Academy ( BIA) Page 1 Modernization, Strengthening G8 / Core Insurance and Increasing the Efficiency Single Stage - One IDA / 59720 Prior Request for Bids Open - International 7,500,000.00 0.00 Canceled 2020-11-25 2020-12-15 2021-02-03 2021-05-04 2021-06-15 2022-02-10 applications at SBC and JBC of the State-owned Insurance Envelope Corporations Modernization, Strengthening G9-2 / Document and Increasing the Efficiency Single Stage - One Management System for SBC IDA / 59720 Prior Request for Bids Open - International 3,000,000.00 0.00 Canceled 2020-10-13 2020-11-02 2020-12-22 2021-03-22 2021-05-03 2021-10-30 of the State-owned Insurance Envelope and JBC Corporations Improving the Capacity of the G9-1 / Document Insurance Development and Single Stage - One Management System for IDRA IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 2,000,000.00 0.00 Canceled 2020-10-14 2020-11-03 2020-12-23 2021-03-23 2021-05-04 2021-10-31 Envelope & BIA and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening G14 / Call center & Customer and Increasing the Efficiency Single Stage - One Relationship Management IDA / 59720 Prior Request for Bids Open - International 4,000,000.00 0.00 Canceled 2020-12-15 2021-01-04 2021-02-23 2021-05-24 2021-07-05 2022-01-01 of the State-owned Insurance Envelope system at SBC and JBC Corporations Improving the Capacity of the Insurance Development and G12 / Centralized rating Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - International 600,000.00 0.00 Canceled 2020-11-11 2020-11-26 2021-01-15 2021-04-15 2021-05-27 2021-09-24 system Envelope and the Bangladesh Insurance Academy ( BIA) G4-2 / Basic automation Modernization, Strengthening including ERP, HRMIS and and Increasing the Efficiency Single Stage - One IDA / 59720 Prior Request for Bids Open - International 6,000,000.00 0.00 Canceled 2020-10-20 2020-11-09 2020-12-29 2021-03-29 2021-05-10 2022-05-10 Enterprise E-mail System at of the State-owned Insurance Envelope SBC and JBC Corporations Improving the Capacity of the G4-1 / Basic automation Insurance Development and including ERP, HRMIS and Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 4,000,000.00 0.00 Canceled 2020-11-30 2020-12-20 2021-02-08 2021-05-09 2021-06-20 2022-06-20 Enterprice E-mail System for Envelope and the Bangladesh Insurance IDRA & BIA Academy ( BIA) Modernization, Strengthening G10-2 / Business Intelligence and Increasing the Efficiency Single Stage - One and data analytics at SBC and IDA / 59720 Prior Request for Bids Open - International 3,000,000.00 0.00 Canceled 2020-11-18 2020-12-08 2021-01-27 2021-04-27 2021-06-08 2021-12-05 of the State-owned Insurance Envelope JBC Corporations Improving the Capacity of the Insurance Development and G11 / Fraud detection and Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - International 700,000.00 0.00 Canceled 2020-10-18 2020-11-02 2020-12-22 2021-03-22 2021-05-03 2021-08-31 prevention system Envelope and the Bangladesh Insurance Academy ( BIA) G2-1 / IT and Supporting Improving the Capacity of the Power Infrastructure (Tier 3 Insurance Development and Under Single Stage - One Data Centre & DR (Passive) for IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 6,500,000.00 0.00 Implementati 2020-10-08 2021-02-02 2020-10-23 2020-12-04 2021-01-18 2021-02-25 2021-06-25 Envelope JBC, SBC, & IDRA and BIA Mini and the Bangladesh Insurance on Data Centre) Academy ( BIA) Improving the Capacity of the G4 / Basic automation Insurance Development and including ERP, HRMIS, Intranet Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 7,647,050.00 0.00 Under Review 2021-03-20 2021-04-04 2021-05-16 2021-06-30 2021-08-11 2022-08-15 and Enterprise E-mail System Envelope and the Bangladesh Insurance for IDRA, JBC, SBC and BIA Academy ( BIA) G23 / Software Applications (Fraud detection, Centralized rating system, Motor road Improving the Capacity of the accident database, Insurance Development and Single Stage - One Development of interactive IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 9,411,764.00 0.00 Under Review 2021-06-16 2021-06-21 2021-08-02 2021-09-16 2021-10-28 2022-04-26 Envelope portal, online agent approval and the Bangladesh Insurance Certification agents , brokers, Academy ( BIA) Call centre and Business Intelligence for IDRA G24 / Supply of Air- Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,847.00 5,869.85 Signed 2021-01-24 2019-07-23 2021-01-24 2020-07-31 2021-01-24 conditioner Management, and Monitoring Quotations Envelope G-25 / Installation of Tally Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 2,415.00 2,394.58 Signed 2021-01-24 2019-12-23 2021-01-24 2019-12-29 2021-01-24 ERP Software Management, and Monitoring Quotations Envelope G-26 / Supply of Stationary Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,894.00 5,727.91 Signed 2021-01-25 2019-09-23 2021-01-25 2019-09-30 2021-01-25 and Goods Management, and Monitoring Quotations Envelope G-27 / Supply of Goods (Bag) Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,824.00 5,810.80 Signed 2021-01-25 2020-02-02 2021-01-25 2020-02-10 2021-01-25 for Training and Workshop Management, and Monitoring Quotations Envelope G-28 / Supply of Office Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,540.00 5,365.88 Signed 2021-01-26 2020-09-29 2021-01-26 2020-10-05 2021-01-26 Equipment (IT Accessories) Management, and Monitoring Quotations Envelope G-29 / Supply of Stationary & Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,882.00 5,729.63 Signed 2021-01-27 2020-09-29 2021-01-27 2020-10-05 2021-01-27 Goods Management, and Monitoring Quotations Envelope G-30 / Supply of Furniture & Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,730.00 5,637.13 Signed 2021-01-27 2020-09-29 2021-01-27 2020-10-05 2021-01-27 Fixture Management, and Monitoring Quotations Envelope G-31 / Supply of Office Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,843.00 5,843.51 Signed 2021-02-02 2020-11-12 2021-02-02 2020-11-18 2021-02-02 Equipment Management, and Monitoring Quotations Envelope Improving the Capacity of the G9 / Document management Insurance Development and Single Stage - One system for IDRA, SBC, JBC & IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 5,000,000.00 0.00 Under Review 2021-03-15 2021-03-30 2021-05-11 2021-06-25 2021-08-06 2022-02-02 Envelope BIA and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development and Pending G3-2 / Setting up Research Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 300,000.00 0.00 Implementati 2021-03-31 2021-04-20 2021-06-09 2021-09-07 2021-10-19 2022-02-16 Center Envelope and the Bangladesh Insurance on Academy ( BIA) Page 2 G10 / Core Insurance applications, Business Modernization, Strengthening Under Intelligence, Call center and and Increasing the Efficiency Single Stage - One IDA / 59720 Prior Request for Bids Open - International 11,176,470.00 0.00 Implementati 2021-03-15 2021-03-30 2021-05-11 2021-06-30 2021-08-11 2022-02-07 Customer Relationship of the State-owned Insurance Envelope on Management System for JBC & Corporations SBC Modernization, Strengthening G4-1-1 / Supply and Under and Increasing the Efficiency Single Stage - One Installation of Computer and IDA / 59720 Post Request for Bids Open - National 1,882,352.00 0.00 Implementati 2021-04-04 2020-12-22 2021-04-14 2021-05-12 2021-01-20 2021-06-01 2021-06-13 2021-07-13 2021-10-11 of the State-owned Insurance Envelope Accessories on Corporations G2-2 / IT & Supporting Improving the Capacity of the Network infrastructure Insurance Development and Single Stage - One Systems, Server & Storage IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 9,500,000.00 0.00 Under Review 2021-04-13 2021-05-06 2021-05-03 2021-05-16 2021-06-22 2021-09-20 2021-11-01 2022-08-31 Envelope (Active) for JBC, SBC, BIA & and the Bangladesh Insurance IDRA Academy ( BIA) Modernization, Strengthening Pending G22 / Supply of Training and Increasing the Efficiency Single Stage - One IDA / 59720 Post Request for Bids Open - National 15,000.00 0.00 Implementati 2021-07-31 2021-08-02 2021-08-16 2021-08-21 2021-09-04 2021-10-04 Bags of the State-owned Insurance Envelope on Corporations Improving the Capacity of the Insurance Development and Pending G32 / IT Equipment for end Request for Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Limited 17,500.00 0.00 Implementati 2021-06-15 2021-07-20 2021-08-19 user Quotations Envelope and the Bangladesh Insurance on Academy ( BIA) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G17 / Supply of Printing Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,937.00 3,819.70 Signed 2020-01-21 2019-09-23 2020-02-13 2019-09-30 2020-02-28 Document Management, and Monitoring Quotations Envelope CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Improving the Capacity of the Insurance Development and S4 / Sector-wide Protection Quality And Cost- / Regulatory Authority (IDRA) Post Open - International 500,000.00 603,750.00 Signed 2017-10-17 2019-03-13 2017-11-07 2019-03-21 2017-12-26 2019-07-11 2018-01-23 2019-08-25 2018-04-01 2019-11-03 2018-05-06 2019-12-02 2018-06-17 2020-01-27 2020-06-16 Gap study - Firm Based Selection and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the S5 / Awareness and Insurance Development and Quality And Cost- Insurance Literacy program - / Regulatory Authority (IDRA) Post Open - International 600,000.00 718,750.00 Signed 2018-04-18 2019-07-15 2018-05-09 2019-07-15 2018-06-30 2019-10-10 2018-07-28 2019-11-14 2018-10-03 2019-11-20 2018-11-07 2020-02-27 2018-12-19 2020-02-27 2021-12-18 Based Selection Firm and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the S2-1 / International Insurance Development and Quality And Cost- Under Regulatory and Supervisor IDA / 59720 Regulatory Authority (IDRA) Prior Open - International 2,000,000.00 0.00 2019-02-26 2019-03-09 2019-03-28 2019-04-03 2019-06-16 2019-10-17 2019-06-18 2019-12-02 2019-08-07 2020-03-15 2019-09-04 2020-10-22 2019-10-16 2022-10-15 Based Selection Implementation Expert Firm and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening S8-1 / Review of Financial and Increasing the Efficiency Quality And Cost- / Post Open - International 400,000.00 0.00 Canceled 2017-12-31 2018-01-21 2018-03-06 2018-04-03 2018-06-02 2018-07-07 2018-08-18 2020-08-07 Condition of SBC - Firm of the State-owned Insurance Based Selection Corporations Modernization, Strengthening S8-2 / Review of Financial and Increasing the Efficiency Quality And Cost- / Post Open - International 300,000.00 0.00 Canceled 2017-12-31 2018-01-21 2018-03-06 2018-04-03 2018-06-02 2018-07-07 2018-08-18 2020-08-17 Condition of JBC - Firm of the State-owned Insurance Based Selection Corporations S13-3-1 / Selection of Modernization, Strengthening International IT Consulting and Increasing the Efficiency Quality And Cost- Firm for review of IT IDA / 59720 Prior Open - International 1,000,000.00 1,025,121.70 Signed 2019-07-15 2019-07-17 2019-08-05 2019-07-29 2019-09-18 2019-12-11 2019-10-16 2020-01-15 2019-11-15 2020-07-30 2019-12-20 2020-09-28 2020-01-24 2020-10-19 2022-07-12 of the State-owned Insurance Based Selection requirements and Corporations Implementation Support Modernization, Strengthening S11 / Asset Liability and Increasing the Efficiency Quality And Cost- IDA / 59720 Prior Open - International 1,000,000.00 700,677.05 Signed 2019-07-14 2019-07-16 2019-08-04 2019-07-30 2019-09-17 2019-12-06 2019-10-15 2020-01-13 2019-12-14 2020-03-12 2020-01-18 2020-07-16 2020-02-29 2020-08-18 2022-08-31 Management Study - Firm of the State-owned Insurance Based Selection Corporations Modernization, Strengthening S7 / Review existing product and Increasing the Efficiency Quality And Cost- IDA / 59720 Post Open - International 500,000.00 0.00 Canceled 2021-01-11 2021-02-01 2021-03-17 2021-04-14 2021-07-03 2021-08-07 2021-09-18 2022-07-15 lines - Firm of the State-owned Insurance Based Selection Corporations Modernization, Strengthening S12 / Life Insurance and Increasing the Efficiency Quality And Cost- Distribution Network Expert IDA / 59720 Post Open - International 500,000.00 0.00 Canceled 2021-01-10 2021-01-31 2021-03-27 2021-04-24 2021-06-23 2021-07-28 2021-09-08 2022-07-05 of the State-owned Insurance Based Selection (Broker Agent) - Firm Corporations Improving the Capacity of the Insurance Development and S2-2 / Legal and Regulatory Quality And Cost- IDA / 59720 Regulatory Authority (IDRA) Prior Open - International 1,000,000.00 0.00 Canceled 2021-01-12 2021-02-26 2021-05-27 2021-07-16 2021-10-19 2021-11-30 2022-01-11 2022-08-09 Expert - Firm Based Selection and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening S14 / Review of existing and Increasing the Efficiency Quality And Cost- Pending product lines & Insurance IDA / 59720 Prior Open - International 1,000,000.00 0.00 2021-04-15 2021-05-06 2021-07-17 2021-08-14 2021-09-13 2021-10-18 2021-11-22 2022-08-31 of the State-owned Insurance Based Selection Implementation Distribution Network-Firm Corporations Modernization, Strengthening and Increasing the Efficiency Quality And Cost- Pending S10-1 / Acturial Firm - Firm IDA / 59720 Prior Open - International 1,000,000.00 0.00 2021-05-31 2021-06-21 2021-08-04 2021-09-01 2021-10-31 2021-12-05 2022-01-16 2022-08-31 of the State-owned Insurance Based Selection Implementation Corporations Page 3 Improving the Capacity of the Insurance Development and Consultant S15 / Selection of Client Under IDA / 59720 Regulatory Authority (IDRA) Post Qualification Open - National 100,000.00 0.00 2021-03-31 2021-05-19 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2022-08-31 Satisfaction Survey firm Implementation and the Bangladesh Insurance Selection Academy ( BIA) Consultant S16 / External Audit Firm for Project Implementation, IDA / 59720 Post Qualification Open - National 5,870.00 0.00 Under Review 2021-05-31 2021-06-13 2021-06-03 2021-06-17 2021-06-24 2021-06-30 2022-08-31 Internal Audit Management, and Monitoring Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual S1-3 / Senior Financial Project Implementation, IDA / 59720 Post Consultant Open 265,000.00 179,062.51 Signed 2019-03-04 2019-03-01 2019-04-08 2019-03-04 2019-04-29 2019-03-10 2019-06-10 2018-08-19 2022-09-22 Management Specialist Management, and Monitoring Selection Individual S1-9 / Project Associate - 4 Project Implementation, Under IDA / 59720 Post Consultant Open 210,000.00 0.00 2019-03-13 2019-02-06 2019-05-17 2019-06-07 2019-07-19 2022-12-30 Nos Management, and Monitoring Implementation Selection Individual S1-2 / Scenior Procurement Project Implementation, IDA / 59720 Post Consultant Open 240,000.00 219,953.81 Signed 2019-03-07 2018-08-23 2019-05-11 2018-11-18 2019-06-01 2019-02-12 2019-06-15 2019-02-12 2022-11-09 Specialist Management, and Monitoring Selection Individual S1-4 / Monitoring & Project Implementation, IDA / 59720 Post Consultant Open 240,000.00 198,363.59 Signed 2019-03-12 2018-07-08 2019-05-16 2019-04-09 2019-06-06 2019-04-30 2019-07-18 2019-04-30 2022-12-29 Evaluation Specialist Management, and Monitoring Selection Individual Project Implementation, S1-6 / IT Specialist IDA / 59720 Post Consultant Open 210,000.00 222,029.65 Signed 2019-03-13 2019-02-06 2019-05-17 2019-05-02 2019-06-07 2019-05-06 2019-07-19 2019-06-13 2022-12-30 Management, and Monitoring Selection Individual S1-5 / Project Management Project Implementation, IDA / 59720 Post Consultant Open 240,000.00 219,386.44 Signed 2019-03-13 2019-02-06 2019-05-17 2019-04-16 2019-06-07 2019-04-17 2019-07-19 2019-06-10 2022-12-30 Specialist- Individual Management, and Monitoring Selection Individual S1-1 / Deputy Project Project Implementation, / Prior Consultant Open 320,000.00 0.00 Canceled 2016-11-30 2017-02-03 2017-02-24 2017-04-07 2023-03-07 Director Management, and Monitoring Selection Improving the Capacity of the Insurance Development and Individual S13-1 / ERP Specialist / Regulatory Authority (IDRA) Prior Consultant Open 600,000.00 0.00 Canceled 2017-06-29 2017-10-12 2017-11-02 2017-12-14 2021-12-13 and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening Individual S13-4 / Document and Increasing the Efficiency / Post Consultant Open 200,000.00 0.00 Canceled 2018-06-28 2018-08-27 2018-09-17 2018-10-29 2020-11-27 Management Specialist of the State-owned Insurance Selection Corporations Individual S1-8 / Account Associate - Project Implementation, IDA / 59720 Post Consultant Open 240,000.00 63,437.04 Signed 2019-03-13 2019-02-06 2019-05-17 2019-04-16 2019-06-07 2019-04-17 2019-07-19 2019-06-24 2022-12-30 Individual Management, and Monitoring Selection Improving the Capacity of the Insurance Development and Individual S10-3-1 / Selection of Life IDA / 59720 Regulatory Authority (IDRA) Prior Consultant Open 420,000.00 479,484.90 Signed 2019-03-11 2019-04-03 2019-06-24 2019-08-29 2019-07-15 2019-11-16 2019-08-19 2019-11-20 2022-12-01 Insurance Actuary and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening S6-3 / Resident Adviser Individual and Increasing the Efficiency (Reinsurance/ Insurance / Prior Consultant Open 500,000.00 0.00 Canceled 2017-07-31 2017-11-03 2017-11-24 2018-01-05 2021-12-15 of the State-owned Insurance Expert) Selection Corporations Modernization, Strengthening Individual S10-3 / Life Insurance and Increasing the Efficiency IDA / 59720 Prior Consultant Open 600,000.00 0.00 Canceled 2019-02-26 2019-06-11 2019-07-02 2019-08-13 2024-08-11 Actuary of the State-owned Insurance Selection Corporations Modernization, Strengthening S13-1-1 / Selection of IT Individual and Increasing the Efficiency Specialist (Information/Cyber IDA / 59720 Post Consultant Open 180,000.00 88,663.18 Signed 2019-07-07 2019-07-08 2019-08-25 2020-07-01 2019-09-15 2020-07-01 2019-10-20 2020-08-23 2022-08-31 of the State-owned Insurance Security) Selection Corporations Modernization, Strengthening Individual S13-2 / Data Analytics and Increasing the Efficiency IDA / 59720 Prior Consultant Open 420,000.00 0.00 Canceled 2019-08-22 2019-12-15 2020-01-05 2020-02-16 2022-02-15 Specialist of the State-owned Insurance Selection Corporations Modernization, Strengthening Individual and Increasing the Efficiency S13-3 / IT Specialist for IDRA / Post Consultant Open 200,000.00 0.00 Canceled 2018-06-28 2018-08-27 2018-09-17 2018-10-29 2020-11-27 of the State-owned Insurance Selection Corporations Improving the Capacity of the S6-3-1 / Resident Adviser Insurance Development and Individual (Insurance and Reinsurance IDA / 59720 Regulatory Authority (IDRA) Post Consultant Open 270,000.00 0.00 Canceled 2019-03-11 2019-03-18 2019-06-24 2019-07-15 2019-08-19 2022-12-01 Expert) and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening S13-2-1 / Selection of IT Individual and Increasing the Efficiency Specialist (Insurance Core IDA / 59720 Post Consultant Open 180,000.00 0.00 Canceled 2019-07-22 2019-07-08 2019-09-09 2019-09-30 2019-11-04 2022-08-31 of the State-owned Insurance applications) Selection Corporations Modernization, Strengthening S6-3-2 / Resident Adviser Individual and Increasing the Efficiency (Insurance & Reinsurance IDA / 59720 Prior Consultant Limited 270,000.00 562,024.62 Signed 2020-02-24 2019-10-10 2020-02-29 2019-12-05 2020-03-07 2020-07-30 2020-03-21 2020-09-01 2022-04-10 of the State-owned Insurance Expert) Selection Corporations Page 4 Modernization, Strengthening Individual and Increasing the Efficiency S6-1 / Reinsurance Expert IDA / 59720 Post Consultant Open 250,000.00 0.00 Canceled 2020-12-22 2021-03-17 2021-04-07 2021-05-19 2022-07-13 of the State-owned Insurance Selection Corporations Improving the Capacity of the S2-3 / International Insurance Development and Individual Regulatory/ Supervisory IDA / 59720 Regulatory Authority (IDRA) Prior Consultant Open 350,000.00 0.00 Canceled 2020-12-30 2021-06-13 2021-07-04 2021-08-15 2022-08-30 Expert and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening Individual S9 / Non-Life Distribution and Increasing the Efficiency IDA / 59720 Prior Consultant Open 300,000.00 0.00 Canceled 2021-01-13 2021-04-28 2021-05-19 2021-06-30 2022-08-24 Network Expert of the State-owned Insurance Selection Corporations Individual S1-7 / Finance Associate - Project Implementation, Under IDA / 59720 Post Consultant Open 100,000.00 0.00 2021-01-13 2019-02-06 2021-03-19 2021-04-09 2021-05-21 2022-06-25 Individual Management, and Monitoring Implementation Selection Improving the Capacity of the Insurance Development and Individual S3 / Insurance Data IDA / 59720 Regulatory Authority (IDRA) Prior Consultant Open 400,000.00 0.00 Canceled 2021-01-19 2021-06-23 2021-07-14 2021-08-25 2022-08-20 Specialist/ non-life Actuary and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening Individual S6-2 / Reinsurance/ and Increasing the Efficiency IDA / 59720 Post Consultant Open 296,250.00 0.00 Canceled 2020-11-18 2021-02-21 2021-03-14 2021-04-25 2022-06-19 Insurance Expert of the State-owned Insurance Selection Corporations Modernization, Strengthening Individual S10-2 / Life Insurance Expert and Increasing the Efficiency IDA / 59720 Post Consultant Open 185,000.00 0.00 Canceled 2021-01-03 2021-02-28 2021-03-21 2021-05-02 2022-05-02 - Actuary of the State-owned Insurance Selection Corporations S13-2-2 / Selection of IT Individual Project Implementation, Specialist (Insurance Core IDA / 59720 Post Consultant Limited 180,000.00 0.00 Canceled 2020-10-21 2020-10-31 2020-11-15 2020-12-13 2022-02-06 Management, and Monitoring Applications) Selection Individual S1-2-2 / Senior Procurement Project Implementation, IDA / 59720 Post Consultant Open 106,000.00 82,552.05 Signed 2021-02-15 2020-12-02 2021-04-05 2021-04-12 2021-04-26 2021-04-12 2021-05-31 2021-06-01 2022-08-31 Specialist Management, and Monitoring Selection Individual S1-2-1 / Senior Procurement Project Implementation, IDA / 59720 Post Consultant Limited 106,000.00 0.00 Canceled 2020-09-21 2020-09-26 2020-10-06 2020-11-04 2022-08-26 Specialist Management, and Monitoring Selection Page 5 PROCUREMENT PLAN (Mandatory Requirement) Project information: Country: Bhutan Project Name: COVID-19 Emergency Response and Health Systems Preparedness Project P-number: P173787 Project Implementation agency: Ministry of Health (MoH) Period covered by this Procurement Plan: Entire Project Period Preamble In accordance with paragraph 5.9 of the World Bank Procurement Regulations for IPF Borrowers, July 2016, revised November 2017 and August 2018 (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents (SPDs) shall be used for all contracts subject to international competitive procurement and those contract as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the World Bank Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan, the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Procurement Rules and Regulations, 2019, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. 2) Procurement shall be open to eligible bidders as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. 5) The Bank shall have the right to review procurement documentation and activities. When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. As per paragraph 5.4 of the Procurement Regulations, the “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework” as attached to this document shall form part of the Model Bidding Documents. Leased Assets: Not Applicable. Procurement of Second-Hand Goods: as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables – Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS): as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Bank’s Procurement Prior Review Thresholds: As this is an emergency response project, there will be no prior review for all procurement during the immediate response period. The project will also have increased threshold for Request for Quotations (RFQ) and national procurement, as applicable in emergency projects. Procurement under Retroactive Financing: Contracts that were procured during the period January 1, 2020 and prior to signing of the Financing Agreement will be eligible for the World Bank’s retroactive financing, if: (i) the procurement procedures, including advertising, are consistent with Sections I, II and III of the Procurement Regulations; and (ii) the contractor/supplier/consultant has explicitly agreed to comply with the relevant provisions of the World Bank’s Anti-Corruption Guidelines, including the World Bank’s right to inspect and audit all accounts, records, and other documents relating to the project that are required to be maintained pursuant to the Financing Agreement. However, there are practical limits to the application of the Anti-Corruption Guidelines in the case of unsuccessful bidders for these retroactively financed contracts. Accordingly, the waiver of paragraph 6 (requiring that the Anti-Corruption Guidelines be applied to all procurement) and paragraphs 9(d) and 10 (requiring agreement by bidders and contractors to comply with the Anti- Corruption Guidelines) of the Anti-Corruption Guidelines, as requested by the Global MPA, will apply to the project. Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); 3For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub- contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know- how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Bhutan : Bhutan: COVID-19 Emergency Response and Health Systems Preparedness Project PLAN General Information Country: Bhutan Bank’s Approval Date of the Original Procurement Plan: 2020-05-18 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173787 GPN Date: 2020-07-21 Project Name: Bhutan: COVID-19 Emergency Response and Health Systems Preparedness Project Loan / Credit No: IDA / 66270 M Executing Agency(ies): inistry of Health, RGoB WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MOH-PPD/WB- WORKS/2020/01 / Civil and electrical works for the extension and modification of Under Emergency COVID-19 Request for Single Stage - One 2021-03- loading/unloading area into IDA / 66270 Post Limited 24,200.00 0.00 Implementat 2020-11-08 2020-11-20 2020-12-09 Response Quotations Envelope 31 Walk-in cooler room and ion construction of pre-casualty unit at Mongar Regional Referral Hospital. W1-RFQ-LIMITED / Office refurbishment including electrical works, partition, , Community Engagement and Request for Single Stage - One 2020-08- working table and chair, for IDA / 66270 Post Limited 15,000.00 0.00 Canceled 2020-06-20 2020-07-12 Risk Communication Quotations Envelope 09 the three consultants and officers deputed from the MoH. MOH-PPD/WB- WORKS/2020/02 / Civil and Pending Emergency COVID-19 Request for Single Stage - One 2021-12- electrical works for the IDA / 66270 Post Limited 28,000.00 0.00 Implementat 2021-05-06 2021-07-01 Response Quotations Envelope 28 construction of Dialysis unit at ion Wangdiphodrang Hospital. MOH-PPD/WB- WORKS/2021/03 / Civil and Pending Emergency COVID-19 Other (with field 2021-12- electrical works for the IDA / 66270 Post Direct Selection Direct 70,000.00 0.00 Implementat 2021-05-17 2021-05-22 2021-06-26 Response for explanation) 23 construction of Flu Clinic at ion Thimphu. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOH/DMSHI/COVID- Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 10,000.00 10,589.51 Completed 2020-06-09 2020-08-04 2020-06-24 2021-01-31 2020-10-16 19/2020 / ICU Beds Response Quotations Envelope MOH-PPD/WB- PROCUREMENT/2020 / Implementation Management Request for Single Stage - One procurement of desktop, IDA / 66270 and Monitoring and Post Limited 7,000.00 0.00 Canceled 2020-07-06 2020-08-31 2021-02-27 Quotations Envelope laptop and printers for project Evaluation staff and project office. MOH-PPD/WB- PROCUREMENT/2020/02 / Surgical N95 respirator mask, Under Emergency COVID-19 good breathability with the IDA / 66270 Post Direct Selection Direct 500,000.00 0.00 Implementati 2020-07-24 2020-06-21 2022-07-25 2020-07-13 2022-08-29 2023-02-25 Response design that does not collapse on against mouth. No valve Quantity : 90,000 number. MSPD/COVID-19/2020/2230 / Supply of medicines: Emergency COVID-19 Lopinavir + Ritonavir : Qty. IDA / 66270 Post Direct Selection Direct 14,000.00 13,641.88 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-27 2021-03-11 2020-04-13 Response (20010) Azithromycin: Qty. (1500) MSPD/COVID-19/2020/2128 Emergency COVID-19 / Supply of medicines Qty. IDA / 66270 Post Direct Selection Direct 11,000.00 10,648.00 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-17 2021-03-11 2020-04-21 Response (50000) MOH/DMSHI/MSPD/NCORON Emergency COVID-19 O/2020/2167 / Supply of face IDA / 66270 Post Direct Selection Direct 11,666.67 11,677.09 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-14 2021-03-11 2020-04-02 Response masks: Qty: (50000) MOH/DMSHI/MSPD/NCORON O/2020/2087 / Supply of Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 7,541.33 0.00 Canceled 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2021-03-11 blankets and pillows: Qty. Response (334) MOH/DMSHI/MSPD/NCORON Emergency COVID-19 O/2020/1953 / Supply of face IDA / 66270 Post Direct Selection Direct 58,500.00 58,931.03 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-02-19 2021-03-11 2020-03-10 Response mask. Qty. (150000) MOH/DMSHI/MSPD/NCORON O/2020/2093 / procurement Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 3,000.00 3,003.51 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-17 2021-03-11 2020-04-09 of Suction machine. Response Qty: (10) MSPD/COVID-19/2020/2229 / Procurement of Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 150.00 109.22 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-27 2021-03-11 2020-04-09 Azithromycin, 500mg. Response Qty:(500) MOH/COVID-19/2019- Emergency COVID-19 20/11961 / Procurement of IDA / 66270 Post Direct Selection Direct 130,000.00 120,000.00 Completed 2020-08-03 2020-04-03 2020-08-08 2020-04-03 2020-09-12 2020-04-03 2021-03-11 2020-04-14 Response 1200 tests/pkts (10 packets ) Page 1 MOH/DMSHI/MSPD/NCORON O/2020/2041 / Procurement Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 10,000.00 9,867.23 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-02-20 2021-03-11 2020-04-02 of GC-Alcohol based hand rub Response of 150ml: Qty.(2450) MOH/DMSHI/MSPD/NCORON O/2020/1951 / Supply of GC Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 250,000.00 223,889.84 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-02-01 2021-03-11 2020-03-13 General Consumables) : Qty: Response (48800) MOH/DMSHI/MSPD/NCORON Emergency COVID-19 O/2020/2145 / Procurement IDA / 66270 Post Direct Selection Direct 7,000.00 7,099.22 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-18 2021-03-11 2020-04-02 Response of Disinfectants (Qty: 1300) MOH/COVID-19/2019- 20/12196 / Procurement of Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 17,000.00 16,880.88 Completed 2020-08-03 2020-04-15 2020-08-08 2020-04-15 2020-09-12 2020-04-15 2021-03-11 2020-04-23 masks N95; approved by Response NIOSH. Qty ( 3,200) MOH/DMSHI/MSPD/NCORON O/2020/1896 / Procurement of GC & PPEs: 1.Supply of N95/ V410 : Qty. (1600) Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 290,000.00 288,226.84 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-01-30 2021-03-11 2020-03-26 2. Googles : Qty. (2000) Response 3. Plastic apron disposable: Qty.(2000) 4.Coverall size S: Qty.(7500) 5.Coverall size M: Qty.(7500) MOH/DMSHI/MSPD/NCORON O/2020/1950 / Procurement of GC: 1.oxygen flow meter and pulse oximeter: Qty. (30 each) Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 26,000.00 19,424.41 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-01-30 2021-03-11 2020-04-02 2.Hydrogen Peroxide & Response glycerin: Qty.(1350 and 940 each) 3. Hand rub & Gloves Qty. (1050 and 69000 each) MOH/DMSHI/MSPD/NCORON O/2020/2144 / Procurement Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 90,000.00 145,118.91 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-18 2021-03-11 2020-03-30 of PPEs: coverall size L&M Response (Qty: 5275) MOH/DMSHI/MSPD/NCORON Emergency COVID-19 O/2020/2196 / Procurement IDA / 66270 Post Direct Selection Direct 4,500.00 4,647.26 Completed 2020-08-03 2020-01-30 2020-08-08 2020-03-07 2020-09-12 2020-03-07 2021-03-11 2020-04-02 Response of GE; bed rail. Qt:(23) MOH/DMSHI/MSPD/NCORON O/2020/2021 / Procurement Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 12,000.00 10,887.74 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-08 2021-03-11 2020-04-06 of PPEs and GC; (glycerine). Response Qty: (2900) MOH/DMSHI/MSPD/NCORON O/2020/2224 / Procurement Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 7,800.00 7,618.01 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-25 2021-03-11 2020-04-07 of oxygen concentrator Qty. Response (12) MOH/DMSHI/MSPD/NCORON O/2020/2211 / Procurement of PPEs and Consumables; Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 25,000.00 24,646.91 Completed 2020-08-03 2020-01-30 2020-08-08 2020-01-30 2020-09-12 2020-03-14 2021-03-11 2020-04-13 (surgical gowns disposable Response Size: L & M) Quantity: (24071) MOH/DMSHI/MSPD/NCORONA /2020/2087 / Procurement of Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 7,541.33 7,722.58 Completed 2020-09-06 2020-01-30 2020-09-11 2020-03-14 2020-10-16 2020-03-14 2021-04-14 2020-04-02 equipments (blankets and Response pillow) MOH-PPD/WB- PROCUREMENT/2020/1 / Implementation Management Procurement of Laptops for IDA / 66270 and Monitoring and Post Direct Selection Direct 4,000.00 3,599.05 Completed 2020-10-11 2020-08-06 2020-10-16 2020-08-07 2020-11-20 2020-10-05 2021-05-19 2020-12-15 PMU staffs Evaluation Qty: 3 MOH/DMSHI/MSPD/COVID- 19/2020/2057 / Procurement Emergency COVID-19 Request for Single Stage - One of equipments & consumables- IDA / 66270 Post Open - National 100,600.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope Portable Ventilators, Astral 150 (QTY: 13) MOH/DMSHI/MSPD/NCORONA /2020/2097 / Procurement of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 145,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 PPEs: Surgical Face Mask Response Quotations Envelope (QTY: 598,700) MOH/DMSHI/MSPD/COVID- 19/2020/2433 / supply of Emergency COVID-19 Request for Single Stage - One PPEs & consumables IDA / 66270 Post Open - National 93,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope -Surgical Face Mask (QTY: 300,000 nos) MOH/DMSHI/MSPD/COVID- 19/2020/2458 / Supply of Emergency COVID-19 Request for Single Stage - One Consumables IDA / 66270 Post Open - National 30.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope -Breathing circuit, Anesthesia, adult 22 mm (QTY: 5 sets) MOH/DMSHI/MSPD/COVID- 19/2020/2143 / Supply of Emergency COVID-19 Request for Single Stage - One PPEs IDA / 66270 Post Open - National 200.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope -Operation cap, size medium (50cm) (QTY: 14,000 nos) MOH/DMSHI/MSPD/COVID- 19/2020/2446 / Supply of Emergency COVID-19 Request for Single Stage - One PPEs IDA / 66270 Post Open - National 1,500.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope -surgical cap, non woven, disposable (QTY:126,900) Page 2 MOH/DMSHI/MSPD/COVID- 19/2020/2500 / Supply of Emergency COVID-19 Request for Single Stage - One consumables IDA / 66270 Post Open - National 6,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope -Disposable gloves , Size M & L (QTY: 100,000) MOH/DMSHI/MSPD/COVID- 19/2020/2418 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 5,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Equipment-Foam mattress Response Quotations Envelope (QTY: 128) MOH/DMSHI/MSPD/COVID- 19/2020/2144 / Supply of PPEs & consumables Emergency COVID-19 Request for Single Stage - One -Coverall size S, White tyvek IDA / 66270 Post Open - National 150,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope (QTY: 4300) -Coverall size M, White Tyvek (QTY: 4300) MOH/DMSHI/MSPD/COVID- 19/2020/2194 / Supply of GC & Consumables-Oxygen Cylinder D type (QTY: 100 Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 23,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 nos) Response Quotations Envelope Supply of GC & Consumables- Oxygen Stand B type (QTY: 10 nos) MOH/DMSHI/MSPD/COVID- 19/2020/2092 / Supply of Emergency COVID-19 Request for Single Stage - One Equipment IDA / 66270 Post Open - National 26,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope -Defibrillator(Pediatric paddle) (QTY: 4) MOH/DMSHI/MSPD/COVID- 19/2020/2191 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 24,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Equipment-Reverse Osmosis Response Quotations Envelope system (QTY: 1) MSDD/MED.GAS/2019- 2020/2065 / Filled Medical Oxygen Gas cylinders (QTY: Pending Emergency COVID-19 99 ) IDA / 66270 Post Direct Selection Direct 170.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-10 2021-06-08 Response [ Empty oxygen 'B' Type- 80 on nos and Empty Oxygen 'D' type- 19 nos ] MSDD/MED.GAS/2019- Pending 2020/2072 / Filled Medical Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 260.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-10 2021-06-08 Oxygen Gas cylinders [Empty Response on Oxygen 'B' type] (QTY: 193) MSDD/MED.GAS/2019- Pending 2020/2105 / Filled Medical Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 120.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-10 2021-06-08 Oxygen Gas cylinders[ Empty Response on Oxygen 'B' type] (QTY: 78 nos) MSDD/MED.GAS/2019- 2020/2047 / Filled Medical Oxygen Gas cylinders (QTY: Pending Emergency COVID-19 600 ) IDA / 66270 Post Direct Selection Direct 1,500.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-10 2021-06-08 Response [ Empty Oxygen 'D' type-300 on nos & purging ang blowing- 300 nos] MSDD/MED.GAS/2019- 2020/2104 / Filled Medical Oxygen Gas cylinders (QTY: Pending Emergency COVID-19 89) IDA / 66270 Post Direct Selection Direct 170.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-10 2021-06-08 Response [Empty Oxygen 'B' type-54 on nos & Empty Oxygen 'D' type- 35 nos] MSDD/MED.GAS/2019- Pending 2020/2103 / Filled Medical Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 160.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-10 2021-06-08 Oxygen Gas cylinders [ Empty Response on Oxygen 'D' type] (QTY: 60 ) MSDD/MED.GAS/2019- 2020/2111 / Filled Medical Oxygen Gas cylinders (QTY: Pending Emergency COVID-19 136 nos) IDA / 66270 Post Direct Selection Direct 300.00 0.00 Implementati 2020-10-31 2020-11-05 2020-12-10 2021-06-08 Response [ Empty Oxygen 'B' type- 72 on nos & Empty Oxygen 'D' type- 64 nos ] MOH/DMSHI/MSPD/COVID- 19/2020/2170 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 1,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Equipment- Trolley (QTY) : 3 Response Quotations Envelope sets MOH/DMSHI/MSPD/COVID- 19/2020/2055 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 1,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Equipment -Semi fowler's bed Response Quotations Envelope (QTY: 8 nos) MOH/DMSHI/MSPD/NCORONA /2020/2086 / Procurement of Equipments: 1. Arterial Blood Gas unit Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 64,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 (QTY: 6 nos) Response Quotations Envelope 2. Infusion Pump (QTY: 15 nos ) 3. Bed ICU (QTY: 18 nos) MOH/DMSHI/MSPD/NCORON O/2020/2078 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 1,400.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 PPEs and GC-Glycerin (QTY: Response Quotations Envelope 1150 nos) BT-MOH-173319-GO-RFQ / Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 44,836.90 0.00 Canceled 2020-05-22 2020-06-09 2020-08-08 Supply of PPEs for COVID-19 Response Quotations Envelope Page 3 MOH/DMSHI/MSPD/NCORONA /2020/2076 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 61,500.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Equipment-Infrared Response Quotations Envelope Thermometer (QTY: 95) MOH/DMSHI/MSPD/COVID- 19/2020/2174 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 1,200.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Equipment & Consumable: Response Quotations Envelope -Electrocardiograph (QTY: 1) MOH/DMSHI/MSPD/NCORONA /2020/2059 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 4,800.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Equipment: Response Quotations Envelope -Infusion Pump (QTY: 13 sets) MOH/DMSHI/MSPD/COVID- 19/2020/2190 / Supply of Emergency COVID-19 Request for Single Stage - One Equipment: IDA / 66270 Post Open - National 11,500.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope -Cartridge (test card) (QTY: 30) MOH/DMSHI/MSPD/COVID- 19/2020/2077 / Procurement Emergency COVID-19 Request for Single Stage - One of PPEs and GC: IDA / 66270 Post Open - National 1,600.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope - Glutaraldehyde, 5 ltr (QTY: 305 nos.) MOH/DMSHI/MSPD/COVID- 19/2020/2140 / Supply of PPEs Emergency COVID-19 Request for Single Stage - One -Clean gloves /non sterile IDA / 66270 Post Open - National 49,500.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope medium (QTY: 216,000) -Clean gloves/ non sterile large (QTY: 90,000) MOH/DMSHI/MSPD/NCORON O/2020/2895 / Supply of Equipment & GC: Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 4,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 - Mattress Foam with Response Quotations Envelope waterproof synthetic cover, Size 78*37*4" (QTY: 94 ) MOH/DMSHI/MSPD/COVID- 19/2020/2453 / Supply of PPEs & Consumables Emergency COVID-19 Request for Single Stage - One -Coverall size L, white Tyvek IDA / 66270 Post Open - National 660,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Response Quotations Envelope (QTY: 3600) -Coverall size M, White Tyvek (QTY: 3600) MOH/DMSHI/MSPD/COVID- 19/2020/2216 / Supply of Equipment -Infrared Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 54,000.00 0.00 Canceled 2020-11-05 2020-12-31 2021-06-29 Thermometer, Digital, Response Quotations Envelope Forehead (sensor) Battery (QTY: 400) 13(02)DMS/HCDD/MSQU/201 9-2020/2910 / Procurement Under of reagents and consumables Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 94,200.00 0.00 Implementati 2021-01-14 2020-11-21 2021-01-19 2020-12-01 2021-02-23 2021-08-22 for Biochemistry and Response on Haematology analyzers. (QTY: 1416 nos.) MOH-PPD/WB- PROCUREMENT/2020/03 / Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 25,000.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 Ultra Refrigerator -70, 900 Response Quotations Envelope litres (QTY:2) MOH-PPD/WB- PROCUREMENT/2020/04 / Emergency COVID-19 Request for Single Stage - One Auto- Disable Syringes, 0.3 IDA / 66270 Post Limited 1,000.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 Response Quotations Envelope ML or 1 ML Needle with 23 Gauge (QTY:22000) MOH-PPD/WB- PROCUREMENT/2020/05 / AD Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 1,000.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 syringes, 2 Ml with 21 gauge Response Quotations Envelope needle (QTY: 22,000) MOH-PPD/WB- PROCUREMENT/2020/06 / Emergency COVID-19 Request for Single Stage - One Diluent, 0.9% sodium chloride IDA / 66270 Post Limited 25,000.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 Response Quotations Envelope solution for injection 2ml USP( QTY: 22,000) MOH-PPD/WB- PROCUREMENT/2020/07 / Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 500.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 Adrenaline 1mg/m Response Quotations Envelope Injection(1ml) (QTY:4000) MOH-PPD/WB- PROCUREMENT/2020/08 / Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 1,800.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 Hydrocortisone 100mg/ml Response Quotations Envelope Injection(2ml) (QTY:4000) MOH-PPD/WB- PROCUREMENT/2020/09 / Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 500.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 Promethazine 25mg/ml Response Quotations Envelope Injection(2ml) (QTY:4000) MOH-PPD/WB- PROCUREMENT/2020/10 / Emergency COVID-19 Request for Single Stage - One "0.5 ML AD syringes (with IDA / 66270 Post Limited 50,000.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 Response Quotations Envelope 23x1” Gauze needle size) (0.6x25mm)" (QTY:919,800) MOH-PPD/WB- PROCUREMENT/2020/11 / Emergency COVID-19 Request for Single Stage - One Biohazard Safety Box 5 litres, IDA / 66270 Post Limited 6,000.00 0.00 Canceled 2021-03-05 2021-04-30 2021-10-27 Response Quotations Envelope WHO/PSO/E-10/SB01.1 Code PQS E10/04 9QTY: 9,200) Page 4 RBC/HEALTH/09/2020- 21/642 / procurement of: Under 1. Hydrocortisone 100mg/ml Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 1,500.00 0.00 Implementati 2021-03-07 2020-11-21 2021-03-12 2020-11-25 2021-04-16 2021-10-13 injection(2ml)- (QTY:4000) Response on 2. Promethazine 25mg/ml Injection ( 2ml)- (QTY-4000) MOH/DMSHI/MSPD/VPDP PROGRAM/2021/1342 / Pending Procurement of consumables- Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 5,000.00 0.00 Implementati 2021-03-07 2021-03-12 2021-04-16 2021-10-13 Auto Disable syringes, 0.3 ML Response on or 1 ML Needle with 23 gauge (QTY:110,000). MOH/DMSHI/MSPD/VPDP PROGRAM/2021/1316 / Emergency COVID-19 Procurement of Equipment; IDA / 66270 Post Direct Selection Direct 23,000.00 23,477.43 Completed 2021-02-26 2020-11-21 2021-03-03 2021-01-22 2021-03-16 2021-02-15 2021-03-30 2021-06-22 Response Ultra Refrigerator, -70 degree Celcius, 900 liters (QTY-2) RBC/HEALTH/09/2020- Pending 21/641 / Procurement of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 400.00 0.00 Implementati 2021-03-05 2021-04-12 2021-05-18 Adrenaline 1mg/ml Response Quotations Envelope on Injection(1ml) (QTY:4000) MOH/DMSHI/MSPD/VPDP PROGRAM/2021/1317 / Pending Procurement of Biohazard Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 6,000.00 0.00 Implementati 2021-03-05 2021-04-23 2021-05-26 Safety Box 5 litres, Response Quotations Envelope on WHO/PSO/E-10/SB01.1 Code PQS E10/04 (QTY:9200) BT-MOH-225373-GO-DIR / Procurement of 0.5ml AD Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 15,000.00 0.00 Canceled 2021-03-22 2021-03-23 2021-04-28 2021-10-25 Syringes (23GX1") Response QTY:363,600 R1- MOH/DMSHI/MSPD/COVID- Emergency COVID-19 Request for Single Stage - One 19/2020/2055 / Supply of IDA / 66270 Post Limited 1,000.00 992.03 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-19 2021-12-08 2020-06-22 Response Quotations Envelope Equipment -Semi fowler's bed (QTY: 8 nos) R2- MOH/DMSHI/MSPD/COVID- 19/2020/2077 / Procurement Emergency COVID-19 Request for Single Stage - One of PPEs and General IDA / 66270 Post Limited 1,600.00 1,622.19 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-13 2021-12-08 2020-06-10 Response Quotations Envelope Consumable: - Glutaraldehyde, 5 ltr (QTY: 305 nos.) R3- MOH/DMSHI/MSPD/NCORONA Emergency COVID-19 Request for Single Stage - One /2020/2059 / Supply of IDA / 66270 Post Limited 4,800.00 4,760.74 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-19 2021-12-08 2020-06-10 Response Quotations Envelope Equipment: -Infusion Pump (QTY: 13 sets) R4- MOH/DMSHI/MSPD/COVID- 19/2020/2140 / Supply of PPEs Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 49,500.00 20,713.32 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-18 2021-12-08 2020-06-22 -Clean gloves /non sterile Response Quotations Envelope medium (QTY: 216,000) -Clean gloves/ non sterile large (QTY: 90,000) R5- MOH/DMSHI/MSPD/NCORON O/2020/2895 / Supply of Emergency COVID-19 Request for Single Stage - One Equipment & GC: - Mattress IDA / 66270 Post Limited 4,000.00 3,596.16 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-14 2021-12-08 2020-06-10 Response Quotations Envelope Foam with waterproof synthetic cover, Size 78*37*4" (QTY: 94 ) R6- MOH/DMSHI/MSPD/COVID- 19/2020/2216 / Supply of Emergency COVID-19 Request for Single Stage - One Equipment -Infrared IDA / 66270 Post Limited 54,000.00 21,825.12 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-25 2021-12-08 2020-06-10 Response Quotations Envelope Thermometer, Digital, Forehead (sensor) Battery (QTY: 400) R7- MOH/DMSHI/MSPD/NCORONA Emergency COVID-19 Request for Single Stage - One /2020/2076 / Supply of IDA / 66270 Post Limited 61,500.00 2,958.08 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-13 2021-12-08 2020-06-22 Response Quotations Envelope Equipment-Infrared Thermometer (QTY: 95) R8- MOH/DMSHI/MSPD/COVID- Emergency COVID-19 Request for Single Stage - One 19/2020/2190 / Supply of IDA / 66270 Post Limited 11,500.00 0.00 Canceled 2021-04-16 2021-06-11 2021-12-08 Response Quotations Envelope Equipment: -Cartridge (test card) (QTY: 30) R9- MOH/DMSHI/MSPD/COVID- Emergency COVID-19 Request for Single Stage - One 19/2020/2174 / Supply of IDA / 66270 Post Limited 1,200.00 1,116.69 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-20 2021-12-08 2020-06-24 Response Quotations Envelope Equipment & Consumable: - Electrocardiograph (QTY: 1) R10- MOH/DMSHI/MSPD/COVID- 19/2020/2453 / Supply of PPEs & Consumables: Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 660,000.00 120,964.78 Completed 2021-04-16 2020-03-09 2021-06-11 2020-04-20 2021-12-08 2020-06-10 -Coverall size L, white Tyvek Response Quotations Envelope (QTY: 3600) -Coverall size M, White Tyvek (QTY: 3600) R11- MOH/DMSHI/MSPD/COVID- 19/2020/2446 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 1,500.00 1,504.66 Completed 2021-04-16 2020-03-09 2021-06-11 2020-04-20 2021-12-08 2020-06-26 PPEs -surgical cap, non Response Quotations Envelope woven, disposable (QTY:126,900) Page 5 R12- MOH/DMSHI/MSPD/NCORONA /2020/2086 / Procurement of Equipment: Emergency COVID-19 Request for Single Stage - One 1. Arterial Blood Gas unit IDA / 66270 Post Limited 64,000.00 64,064.63 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-14 2021-12-08 2020-06-10 Response Quotations Envelope (QTY: 6 nos) 2. Infusion Pump (QTY: 15 nos ) 3. Bed ICU (QTY: 18 nos) R13- MOH/DMSHI/MSPD/NCORON Emergency COVID-19 Request for Single Stage - One O/2020/2078 / Supply of IDA / 66270 Post Limited 1,400.00 1,409.49 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-13 2021-12-08 2020-06-10 Response Quotations Envelope PPEs and GC-Glycerin (QTY: 1150 nos) R14- MOH/DMSHI/MSPD/NCORONA Emergency COVID-19 Request for Single Stage - One /2020/2097 / Procurement of IDA / 66270 Post Limited 145,000.00 143,973.11 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-16 2021-12-08 2020-06-10 Response Quotations Envelope PPEs: Surgical Face Mask (QTY: 598,700) R15- MOH/DMSHI/MSPD/COVID- 19/2020/2144 / Supply of PPEs & consumables: Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 150,000.00 70,727.29 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-18 2021-12-08 2020-06-10 -Coverall size S, White tyvek Response Quotations Envelope (QTY: 4300) -Coverall size M, White Tyvek (QTY: 4300) R16- MOH/DMSHI/MSPD/COVID- 19/2020/2194 / Supply of GC & Consumables: Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 23,000.00 22,837.64 Completed 2021-04-16 2020-03-20 2021-06-11 2020-03-23 2021-12-08 2020-06-10 -Oxygen Cylinder D type Response Quotations Envelope (QTY: 100 nos) -Oxygen Stand B type (QTY: 10 nos) R17- MOH/DMSHI/MSPD/COVID- Pending Emergency COVID-19 19/2020/2170 / Supply of IDA / 66270 Post Direct Selection Direct 1,000.00 0.00 Implementati 2021-04-11 2021-04-16 2021-05-21 2021-11-17 Response Equipment- Trolley (QTY) : 3 on sets R18- MOH/DMSHI/MSPD/COVID- 19/2020/2092 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Open - National 26,000.00 26,456.83 Completed 2021-04-16 2021-06-11 2020-03-14 2021-12-08 2020-06-22 Equipment - Response Quotations Envelope Defibrillator(Pediatric paddle) (QTY: 4) R19- MOH/DMSHI/MSPD/COVID- Emergency COVID-19 Request for Single Stage - One 19/2020/2191 / Supply of IDA / 66270 Post Limited 24,000.00 0.00 Canceled 2021-04-16 2021-06-11 2021-12-08 Response Quotations Envelope Equipment-Reverse Osmosis system (QTY: 1) R20- MOH/DMSHI/MSPD/COVID- 19/2020/2143 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 200.00 162.06 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-18 2021-12-08 2020-06-22 PPEs -Operation cap, size Response Quotations Envelope medium (50cm) (QTY: 14,000 nos) R21- MOH/DMSHI/MSPD/COVID- Pending 19/2020/2458 / Supply of Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 30.00 0.00 Implementati 2021-04-11 2021-04-16 2021-05-21 2021-11-17 Consumables -Breathing Response on circuit, Anesthesia, adult 22 mm (QTY: 5 sets) R22- MOH/DMSHI/MSPD/COVID- Emergency COVID-19 Request for Single Stage - One 19/2020/2433 / supply of IDA / 66270 Post Limited 93,000.00 93,448.43 Completed 2021-04-16 2020-03-09 2021-06-11 2020-04-21 2021-12-08 2020-06-10 Response Quotations Envelope PPEs & consumables -Surgical Face Mask (QTY: 300,000 nos) R23- MOH/DMSHI/MSPD/COVID- 19/2020/2500 / Supply of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 6,000.00 5,940.76 Completed 2021-04-16 2020-03-09 2021-06-11 2020-04-25 2021-12-08 2020-06-22 consumables -Disposable Response Quotations Envelope gloves , Size M & L (QTY: 100,000) R24- MOH/DMSHI/MSPD/COVID- 19/2020/2057 / Procurement Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 100,600.00 100,732.82 Completed 2021-04-16 2020-03-09 2021-06-11 2020-03-19 2021-12-08 2020-06-11 of equipment & consumables- Response Quotations Envelope Portable Ventilators, Astral 150 (QTY: 13) R25- MOH/DMSHI/MSPD/COVID- Emergency COVID-19 Request for Single Stage - One 19/2020/2418 / Supply of IDA / 66270 Post Limited 5,000.00 4,903.40 Completed 2021-04-16 2020-03-09 2021-06-11 2020-04-17 2021-12-08 2020-06-24 Response Quotations Envelope Equipment-Foam mattress (QTY: 128) DMSHI/MSPD/VACCINATION/ 2020-21 / Procurement of Emergency COVID-19 Request for Single Stage - One IDA / 66270 Post Limited 20,000.00 0.00 Canceled 2021-04-06 2021-06-01 2021-11-28 0.5ml AD Syringes (23GX1") Response Quotations Envelope QTY:363,600 R1- DMSHI/MSPD/VACCINATION/ Emergency COVID-19 2020-21 / Procurement of IDA / 66270 Post Direct Selection Direct 20,000.00 17,956.05 Completed 2021-04-25 2021-03-19 2021-04-30 2021-04-06 2021-06-04 2021-04-20 2021-12-01 2021-06-22 Response 0.5ml AD Syringes (23GX1") QTY:363,600 R-MOH/DMSHI/MSPD/COVID- Pending 19/2020/2190 / Supply of Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 11,500.00 0.00 Implementati 2021-05-27 2021-06-01 2021-07-06 2022-01-02 Equipment: -Cartridge (test Response on card) (QTY: 30) Page 6 R-MOH/DMSHI/MSPD/COVID- Pending 19/2020/2191 / Supply of Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 24,000.00 0.00 Implementati 2021-05-27 2021-06-01 2021-07-06 2022-01-02 Equipment-Reverse Osmosis Response on system (QTY: 1) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual VPDP(12)DOPH/2020/ / Under Transportation of vaccine to Emergency COVID-19 IDA / 66270 Post Direct Selection Direct 20,000.00 0.00 Implementati 2021-03-24 2021-03-18 2021-03-24 2021-03-24 2021-04-13 2021-05-15 different districts in Bhutan Response on (using helicopter services) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PPD/WB(COVID- 10)PROC/2020 / Hiring of Procurement Individual Emergency COVID-19 Officer/Consultant for COVID- IDA / 66270 Post Consultant Limited 46,500.00 13,229.72 Signed 2020-05-19 2020-05-23 2020-05-24 2020-05-27 2020-06-14 2020-06-15 2020-07-19 2020-06-15 2021-01-15 Response 19 Emergency Response and Selection Health Systems Preparedness Project. PPD/WB(COVID-19)M&E2020 / Hiring of M&E Individual Officer/Consultant for COVID- Emergency COVID-19 IDA / 66270 Post Consultant Limited 55,800.00 13,358.71 Signed 2020-05-19 2020-05-23 2020-05-24 2020-05-27 2020-06-14 2020-06-15 2020-07-19 2020-06-15 2021-01-15 19 Emergency Response and Response Selection Health Systems Preparedness Project PPD/WB(COVID- 19)CIVIL/2020 / Hiring of Individual Civil Engineer/Consultant for Emergency COVID-19 IDA / 66270 Post Consultant Limited 49,600.00 13,228.11 Signed 2020-05-19 2020-05-23 2020-05-24 2020-05-27 2020-06-14 2020-06-18 2020-07-19 2020-06-18 2021-01-15 COVID-19 Emergency Response Selection Response and Health Systems Preparedness Project. Page 7 PROCUREMENT PLAN Textual Part Project information: North Macedonia, Primary Education Improvement Project (P171973) Project Implementation agency: Ministry of Education and Science Date of the Procurement Plan: February 2021 Period covered by this Procurement Plan: First 18 months of project implementation In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: for all procurement activities - both with international and national approach. Respectively, the complaints arising in connection with contracts for which the Bank’s SPDs are used shall be administered and handled in accordance with Annex III of the Regulations. For international procedures the procurement notices will be published automatically through STEP on the Bank’s external website and UNDB, as well as locally on the Ministry’s website, daily newspaper as relevant, and on the portal of Public Procurement Bureau at: (https://e-nabavki.gov.mk/PublicAccess/home.aspx#/notices) 1 Thresholds for Procurement Approaches and Methods (€ thousands) Works Goods, IT and non- Shortlist of national consulting services consultants Open Open RfQ Open Open RfQ Consulti Engineerin internati nationa internati nation ng g and onal l onal al services constructio n supervisio ≤ ≤ ≥ < ≥ < ≤ n ≤ 5,000 5,000 200 1 000 1 000 100 300 N/A Review Arrangements First contract for each First contract for each First contract for each approach and method and approach and method approach and method, all all >3 000 and all >3 000 TORs and all contracts > 1 000 Individual consultants all Direct Selection all > 80 000 Direct Selection all > 80 TORs and all contracts > 000 300 Direct Selection all >10 000 2 PROCUREMENT North Macedonia : Primary Education Improvement Project PLAN General Information Country: North Macedonia Bank’s Approval Date of the Original Procurement Plan: 2021-02-12 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171973 GPN Date: 2021-01-25 Project Name: Primary Education Improvement Project Loan / Credit No: IBRD / 91820 M Executing Agency(ies): inistry of Education and Science WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MES-217476-GO-RFQ / Reform of the Monitoring and Under Procurement of laptop Request for Single Stage - One IBRD / 91820 Evaluation of the National Post Open - National 0.00 Implementati 2021-02-20 2021-04-14 2021-07-13 computers for National Quotations Envelope Progress in Learning on Examination Center Pending MK-MES-217499-GO-RFQ / Sector management, Project Request for Single Stage - One IBRD / 91820 Post Open - National 0.00 Implementati 2021-05-08 2021-07-03 2021-09-01 Procurement of vehicle management and M&E Quotations Envelope on MK-MES-217526-GO-RFB / Under Improving Learning at the Single Stage - One Procurement of ICT IBRD / 91820 Post Request for Bids Open - International 0.00 Implementati 2021-05-20 2021-05-20 2021-05-25 2021-05-20 2021-07-06 2021-08-05 2021-09-09 2022-03-08 School Level Envelope equipment for primary on schools MK-MES-217529-GO-RFQ / Pending Procurement of air- Improving Learning at the Request for Single Stage - One IBRD / 91820 Post Open - National 0.00 Implementati 2021-12-06 2022-01-31 2022-05-31 conditioning devices for School Level Quotations Envelope on primary schools MK-MES-217538-GO-RFB / Pending Procurement of network Improving Learning at the Single Stage - One IBRD / 91820 Post Request for Bids Open - National 0.00 Implementati 2021-05-05 2021-05-10 2021-06-21 2021-07-21 2021-08-25 2022-02-21 infrastructure for primary School Level Envelope on schools MK-MES-217541-GO-RFB / Pending Improving Learning at the Single Stage - One Procurement of IT equipment IBRD / 91820 Post Request for Bids Open - International 0.00 Implementati 2021-05-19 2021-05-24 2021-07-05 2021-08-04 2021-09-08 2022-03-07 School Level Envelope for special schools on MK-MES-217549-GO-RFB / Improving Learning at the Single Stage - One Procurement of school IBRD / 91820 Post Request for Bids Open - National 0.00 Canceled 2021-06-01 2021-06-06 2021-07-18 2021-08-01 2021-09-05 2022-01-03 School Level Envelope furniture for primary schools MK-MES-217553-GO-RFB / Under Procurement of science Improving Learning at the Single Stage - One IBRD / 91820 Prior Request for Bids Open - International 0.00 Implementati 2021-03-15 2021-06-21 2021-03-20 2021-05-01 2021-05-22 2021-06-26 2021-10-24 laboratories equipment and School Level Envelope on resources for primary schools MK-MES-217817-GO-RFQ / Pending Improving Learning at the Request for Single Stage - One Procurement of Hardware for IBRD / 91820 Post Open - National 0.00 Implementati 2021-06-14 2021-08-09 2021-11-07 School Level Quotations Envelope MOES on MK-MES-217821-GO-RFQ / Reform of the Monitoring and Pending Single Stage - One Procurement of hardware and IBRD / 91820 Evaluation of the National Post Request for Bids Open - National 0.00 Implementati 2021-07-12 2021-07-17 2021-08-28 2021-09-27 2021-11-01 2021-12-31 Envelope equipment for NEC Progress in Learning on MK-MES-217829-GO-RFQ / Pending Sector management, Project Request for Single Stage - One Hardware and office IBRD / 91820 Post Limited 0.00 Implementati 2021-10-12 2021-12-07 2022-02-05 management and M&E Quotations Envelope equipment for PMU on MK-MES-217549-2-GO- Under RFB/018-21 / Procurement of Improving Learning at the Single Stage - One IBRD / 91820 Post Request for Bids Open - National 0.00 Implementati 2021-05-14 2021-05-10 2021-05-19 2021-06-30 2021-06-09 2021-07-30 2021-06-17 2021-09-03 2022-03-02 school furniture for primary School Level Envelope on schools MK-MES-233647-GO- Improving Learning at the Request for Single Stage - One RFQ/019-21 / Procurement of IBRD / 91820 Post Open - National 5,755.96 Signed 2021-05-30 2021-07-21 2021-06-08 2021-08-20 School Level Quotations Envelope office equipment NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MES-217472-CS-CQS / Consultant Functional Analysis of the Improving Learning at the Pending IBRD / 91820 Post Qualification Open - National 0.00 2021-03-24 2021-04-14 2021-05-28 2021-06-27 2021-08-01 2022-01-28 State Administrative School Level Implementation Selection Inspectorate Consultant MK-MES-217500-CS-CQS / Sector management, Project Pending IBRD / 91820 Post Qualification Limited 0.00 2021-09-01 2021-09-15 2021-10-15 2021-11-19 2026-08-31 Project Audit management and M&E Implementation Selection Page 1 MK-MES-217501-CS-QCBS / Technical Assistance for revision of the school Improving Learning at the Quality And Cost- Pending IBRD / 91820 Post Open - International 0.00 2021-05-04 2021-05-25 2021-06-23 2021-07-21 2021-08-10 2021-09-07 2021-10-12 2026-02-27 improvement framework and School Level Based Selection Implementation design and rollout of the school grants program MK-MES-217515-CS-CQS / Consultant Preparation of designs for Improving Learning at the Pending IBRD / 91820 Post Qualification Open - National 0.00 2021-05-20 2021-06-03 2021-07-01 2021-07-22 2021-08-26 2021-11-24 upgrading of the physical School Level Implementation Selection learning environment MK-MES-217814-CS-CQS / Consultant Design, development and Improving Learning at the Pending IBRD / 91820 Post Qualification Open - National 0.00 2021-12-15 2022-01-05 2022-02-18 2022-03-20 2022-04-24 2022-10-21 implementation of School Level Implementation Selection information sharing platform MK-MES-217818-CS-CQS / Outreach activities and Consultant Improving Learning at the Pending logistical support in IBRD / 91820 Post Qualification Open - National 0.00 2021-07-06 2021-07-27 2021-09-09 2021-10-09 2021-11-13 2026-02-27 School Level Implementation organization of project related Selection training and events MK-MES-217819-CS-QCBS / Technical assistance and strengthening of NEC and MOES capacities for Reform of the Monitoring and development and Quality And Cost- Pending IBRD / 91820 Evaluation of the National Post Open - International 0.00 2021-05-18 2021-06-08 2021-07-22 2021-08-19 2021-09-18 2021-10-23 2021-11-27 2026-02-27 implementation of National Based Selection Implementation Progress in Learning Assessment Program and training for data analysis and reporting following international standards MK-MES-217820-CS-CQS / Reform of the Monitoring and Consultant Pending Development of software for IBRD / 91820 Evaluation of the National Post Qualification Open - National 0.00 2021-10-12 2021-11-02 2021-12-16 2022-01-15 2022-02-19 2022-08-18 Implementation national assessment Progress in Learning Selection MK-MES-217825-CS-CQS / Outreach activities including Reform of the Monitoring and Consultant citizen engagement activities Pending IBRD / 91820 Evaluation of the National Post Qualification Open - National 0.00 2022-01-11 2022-02-01 2022-03-17 2022-04-16 2022-05-21 2026-02-27 and logistical support in Implementation Progress in Learning Selection organization of events related to NEC activities MK-MES-217827-CS-CQS / Enhancing Teacher, Multi- Consultant Procurement of software for Professional Support Teams, Pending IBRD / 91820 Post Qualification Open - National 0.00 2021-08-10 2021-08-31 2021-10-14 2021-11-13 2021-12-18 2022-06-16 Bureau for Development of and School Leader Implementation Selection Education Competences MK-MES-217828-CS-CQS / Consultant Feasibility study for Sector management, Project IBRD / 91820 Post Qualification Open - National 0.00 Canceled 2021-06-02 2021-06-23 2021-08-06 2021-09-05 2021-10-10 2022-04-08 optimization of the school management and M&E Selection network MK-MES-217838-CS-CQS / Consultant Sector management, Project Pending Performance Audit of the IBRD / 91820 Post Qualification Open - National 0.00 2022-03-16 2022-04-06 2022-05-20 2022-06-19 2022-07-24 2026-02-27 management and M&E Implementation School Grants Program Selection MK-MES-217841-CS-CQS / Consultant Data collection for following Sector management, Project Pending IBRD / 91820 Post Qualification Open - National 0.00 2021-09-16 2021-10-07 2021-11-20 2021-12-20 2022-01-24 2026-02-27 project indicators and citizen management and M&E Implementation Selection engagement MK-MES-235217-CS- Consultant CQS/023-21 / Design and Improving Learning at the Under IBRD / 91820 Post Qualification Open - National 0.00 2021-05-25 2021-05-26 2021-06-09 2021-06-24 2021-07-04 2021-07-14 2021-08-26 Development of Digital School Level Implementation Selection Educational Materials MK-MES-235695-CS- Consultant CQS/024-21 / Design and Improving Learning at the Under IBRD / 91820 Post Qualification Open - National 0.00 2021-05-25 2021-05-26 2021-06-08 2021-06-22 2021-06-27 2021-07-07 2022-02-28 development of mobile School Level Implementation Selection applications MK-MES-235696-CS- CQS/025-21 / Development Consultant Improving Learning at the Under of Interactive Materials for IBRD / 91820 Post Qualification Open - National 0.00 2021-05-25 2021-05-26 2021-06-08 2021-06-22 2021-06-27 2021-07-07 2021-08-31 School Level Implementation Mathematics and Natural Selection sciences INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual MK-MES-217477-CS-INDV / Improving Learning at the IBRD / 91820 Prior Consultant Direct 0.00 Canceled 2021-03-01 2021-03-12 2021-03-11 2021-04-07 2021-03-16 2021-04-20 2026-01-28 Primary Education Coordinator School Level Selection Individual MK-MES-217479-CS-INDV / Improving Learning at the IBRD / 91820 Post Consultant Direct 131,584.02 Signed 2021-03-01 2021-03-15 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 Grants Coordinator School Level Selection MK-MES-217480-CS-INDV / Individual Improving Learning at the School Infrastructure IBRD / 91820 Post Consultant Direct 131,584.02 Signed 2021-03-01 2021-03-12 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 School Level Specialist Selection Individual MK-MES-217482-CS-INDV / Improving Learning at the IBRD / 91820 Post Consultant Direct 103,587.42 Signed 2021-03-01 2021-03-16 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 Architect (1) School Level Selection Individual MK-MES-217483-CS-INDV / Improving Learning at the IBRD / 91820 Post Consultant Direct 103,587.42 Signed 2021-03-01 2021-03-16 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 Architect (2) School Level Selection MK-MES-217484-CS-INDV / Reform of the Monitoring and Individual Administrative Assistant for IBRD / 91820 Evaluation of the National Post Consultant Direct 65,092.10 Signed 2021-03-01 2021-03-15 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 National Examination Center Progress in Learning Selection Page 2 MK-MES-217486-CS-INDV / Reform of the Monitoring and Individual Coordinator for National IBRD / 91820 Evaluation of the National Post Consultant Direct 131,584.02 Signed 2021-03-01 2021-03-15 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 Assessment Progress in Learning Selection Enhancing Teacher, Multi- MK-MES-217487-CS-INDV / Individual Professional Support Teams, Coordinator for Professional IBRD / 91820 Prior Consultant Direct 0.00 Canceled 2021-03-01 2021-03-15 2021-03-11 2021-04-07 2021-03-16 2021-04-20 2026-02-27 and School Leader Development Selection Competences Enhancing Teacher, Multi- Individual MK-MES-217488-CS-INDV / Professional Support Teams, IBRD / 91820 Post Consultant Direct 65,092.10 Signed 2021-03-01 2021-03-16 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 Career Development Specialist and School Leader Selection Competences Individual MK-MES-217489-CS-INDV / Sector management, Project IBRD / 91820 Post Consultant Direct 156,780.96 Signed 2021-03-01 2021-03-11 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 Project Director management and M&E Selection Individual MK-MES-217490-CS-INDV / Sector management, Project IBRD / 91820 Post Consultant Direct 131,584.02 Signed 2021-03-01 2021-03-11 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 Procurement Specialist management and M&E Selection MK-MES-217491-CS-INDV / Individual Sector management, Project Financial Management IBRD / 91820 Post Consultant Direct 131,584.02 Signed 2021-03-01 2021-03-11 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 management and M&E Specialist Selection MK-MES-217492-CS-INDV / Individual Sector management, Project Information Technology IBRD / 91820 Post Consultant Direct 131,584.02 Signed 2021-03-01 2021-03-12 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 management and M&E Specialist Selection Individual MK-MES-217493-CS-INDV / Sector management, Project IBRD / 91820 Post Consultant Direct 158,880.71 Signed 2021-03-01 2021-03-12 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 IT Consultant management and M&E Selection MK-MES-217494-CS-INDV / Individual Sector management, Project Monitoring and Evaluation IBRD / 91820 Post Consultant Direct 131,584.02 Signed 2021-03-01 2021-03-12 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 management and M&E Specialist Selection Individual MK-MES-217496-CS-INDV / Sector management, Project IBRD / 91820 Prior Consultant Direct 0.00 Canceled 2021-03-01 2021-03-12 2021-03-11 2021-04-07 2021-03-16 2021-04-20 2026-02-27 Social Specialist management and M&E Selection MK-MES-217497-CS-INDV / Individual Sector management, Project Citizen Engagement IBRD / 91820 Prior Consultant Direct 0.00 Canceled 2021-03-01 2021-03-12 2021-03-11 2021-04-07 2021-03-16 2021-04-20 2026-02-27 management and M&E Consultant Selection MK-MES-217498-CS-CDS / Sector management, Project Pending Financial Management IBRD / 91820 Post Direct Selection Direct 0.00 2021-03-01 2021-03-11 2021-04-20 2026-02-27 management and M&E Implementation Software Maintenance Individual MK-MES-217518-CS-INDV / Improving Learning at the Pending IBRD / 91820 Post Consultant Open 0.00 2021-04-01 2021-05-04 2021-05-18 2021-06-22 2026-02-27 Environmental Consultant School Level Implementation Selection MK-MES-217812-CS-INDV / Consultant for designing Individual Improving Learning at the Pending mechanisms for promoting IBRD / 91820 Post Consultant Open 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-03-15 School Level Implementation accountability through Selection information sharing MK-MES-217824-CS-INDV / Reform of the Monitoring and Individual Local consultant for Under IBRD / 91820 Evaluation of the National Post Consultant Open 0.00 2021-12-06 2022-01-24 2022-02-14 2022-03-21 2022-09-17 strengthening NEC capacity in Implementation Progress in Learning Selection application of IRT MK-MES-217837-CS-INDV / Individual Sector management, Project Consultant for processing and IBRD / 91820 Post Consultant Direct 156,081.05 Signed 2021-03-01 2021-03-12 2021-03-11 2021-04-07 2021-03-16 2021-04-26 2021-04-20 2021-04-28 2026-02-27 management and M&E analyzing data Selection MK-MES-217840-CS-INDV / Individual Sector management, Project Pending Impact Evaluation of the IBRD / 91820 Post Consultant Open 0.00 2022-03-15 2022-05-03 2022-05-24 2022-06-28 2026-02-27 management and M&E Implementation Schools Grants Program Selection Individual MK-MES-218027-CS-INDV / Improving Learning at the Pending IBRD / 91820 Post Consultant Open 0.00 2022-03-09 2022-04-27 2022-05-18 2022-06-22 2026-02-27 Grants Financial Officer School Level Implementation Selection MK-MES-218036-CS-INDV / Reform of the Monitoring and Individual Pending Psychometric analysis IBRD / 91820 Evaluation of the National Post Consultant Open 0.00 2021-12-14 2022-02-01 2022-02-22 2022-03-29 2026-02-27 Implementation specialist Progress in Learning Selection MK-MES-217477-2-CS-INDV Individual Improving Learning at the / Primary Education IBRD / 91820 Post Consultant Direct 141,965.01 Signed 2021-04-14 2021-04-19 2021-04-19 2021-04-21 2021-04-22 2021-04-23 2021-04-30 2021-04-28 2026-02-27 School Level Coordinator Selection Enhancing Teacher, Multi- MK-MES-217487-2-CS-INDV Individual Professional Support Teams, / Coordinator for Professional IBRD / 91820 Post Consultant Direct 141,965.01 Signed 2021-04-14 2021-04-19 2021-04-19 2021-04-21 2021-04-22 2021-04-23 2021-04-30 2021-04-28 2026-02-27 and School Leader Development Selection Competences MK-MES-217497-2-CS-INDV Individual Sector management, Project / Citizen Engagement IBRD / 91820 Post Consultant Direct 65,038.16 Signed 2021-04-14 2021-04-19 2021-04-19 2021-04-21 2021-04-22 2021-04-23 2021-04-30 2021-04-28 2026-02-27 management and M&E Consultant Selection Individual MK-MES-217496-2-CS-INDV Sector management, Project Pending IBRD / 91820 Post Consultant Open 0.00 2021-05-10 2021-06-28 2021-07-19 2021-08-23 2026-02-27 / Social Specialist management and M&E Implementation Selection MK-MES-235211-CS- CDS/022-21 / Improving cost Sector management, Project Under IBRD / 91820 Post Direct Selection Direct 0.00 2021-05-20 2021-05-20 2021-05-26 2021-06-15 2022-01-31 efficiency in primary and management and M&E Implementation secondary education Page 3 MK-MES-237011-CS- INDV/027-21 / Consultant for Enhancing Teacher, Multi- improvement of the design of Individual Professional Support Teams, Under the INSET provision and IBRD / 91820 Post Consultant Open 0.00 2021-06-15 2021-06-03 2021-07-11 2021-07-21 2021-07-31 2021-12-28 and School Leader Implementation implementation of Selection Competences professional development program for teachers MK-MES-237016-CS- Individual Improving Learning at the Under INDV/028-21 / Digital IBRD / 91820 Post Consultant Open 0.00 2021-05-31 2021-06-03 2021-06-24 2021-06-29 2021-07-05 2022-01-01 School Level Implementation Learning Coordinator Selection MK-MES-237017-CS- Enhancing Teacher, Multi- INDV/029-21 / Individual Professional Support Teams, Under Administrative Officer for IBRD / 91820 Post Consultant Open 0.00 2021-05-31 2021-06-03 2021-06-29 2021-07-04 2021-07-14 2026-02-27 and School Leader Implementation teacher pre- service training Selection Competences for the needs of the BDE MK-MES-237021-CS- Reform of the Monitoring and Individual INDV/030-21 / IT Specialist Pending IBRD / 91820 Evaluation of the National Post Consultant Open 0.00 2021-07-01 2021-08-03 2021-08-17 2021-09-14 2026-02-27 for National Examination Implementation Progress in Learning Selection Center Page 4 UNITED REPUBLIC OF TANZANIA Procurement Plan General 1. Project Information Country: Tanzania Project Name: Secondary Education Quality Improvement Program Project ID: P170480 2. Project Implementation Agency: President’s Office, Regional Administration and Local Government 3. Date of the Procurement Plan: December 5, 2019 4. Period Covered by this procurement plan: January 2020 to June 2021 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. III. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 1 When the Borrower uses its own national open competitive procurement arrangements as set forth in The Public Procurement Act, 2011, The Public Procurement (Amendment) Act, 2016, the Public Procurement Regulations, 2013 and the Public Procurement (Amendment) Regulations, 2016, such arrangements shall be subject to paragraph 5.3 and 5.4 of the Procurement Regulations and the following conditions: o Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts o There should be no mandatory requirements for inclusion of local experts and firms for the consulting assignments; o There should be no exclusive preference based on threshold prescribed in PPA and its Regulations; o Negotiations with the lowest evaluated bidder to reduce price in the case of goods, works and non-consulting services where competitive methods have been used shall not be allowed; o The fixed budget method shall not be used for goods, works and non- consulting services; o Established and approved procurement standards by the government may be used, provided that they are not restrictive When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.4(c) and 5.5 of the Procurement Regulations, the request for bids/request for proposals/request for quotations document shall require that Bidders/Proposers submitting Bids/Proposals/quotations present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. IV. Prequalification: Not Applicable V. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable VI. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable VII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable 2 Domestic preference is not applicable for National Open Competitive Procurement VIII. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Not Applicable IX. Other Relevant Procurement Information Not Applicable 3 X. Threshold for Prior Review, Procurement Approaches and Methods – Good, Works and Non-Consulting Services Procurement Approaches and Methods Prior (US$ millions) Review Category Open Open Request for (US$ millions) International National Quotation (RfQ) Works ≥ 10 ≥ 15 < 15 ≤ 0.2 Goods, IT, and non- ≥2 ≥5 <5 ≤ 0.1 consulting services Post Review: All contracts not subject to prior review shall be subject to post review. Summary of the procurement packages for Good, Works and Non-Consulting Services (Planned for the first 18 months after project effectiveness): XI. Thresholds for Prior Review, Selection Approaches and Methods – Consulting Services Category Prior Short List of National Consultants Review Consulting Engineering and Construction (US$ Services Supervision millions) Consultants ≥1 ≤ 0.3 ≤ 0.3 (Firms) Individual ≥ 0.3 n.a. n.a. Consultants Note: Consultancy services estimated to cost equivalent to US $ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or regional newspaper. 4 PROCUREMENT Tanzania : Tanzania Secondary Education Quality Improvement Project (SEQUIP) PLAN General Information Country: Tanzania Bank’s Approval Date of the Original Procurement Plan: 2021-05-24 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170480 GPN Date: 2021-06-09 Project Name: Tanzania Secondary Education Quality Improvement Project (SEQUIP) Loan / Credit No: IDA / 65340 M Executing Agency(ies): inistry of Education, Science and Technology - TZ WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MOEST-TZ-235084-GO- RFB / Procurement of Seven Component 4: Project Pending Single Stage - One (7) Motor Vehicles for Project IDA / 65340 Coordination, Monitoring and Post Request for Bids Open - National 800,000.00 0.00 Implementati 2021-07-27 2021-08-01 2021-09-12 2021-10-12 2021-11-16 2022-05-15 Envelope Coordination and Monitoring Evaluation on for MoEST (5) and IAE (2) TZ-MOEST-TZ-235154-GO- Component 4: Project Pending RFB / Procurement of Office Single Stage - One IDA / 65340 Coordination, Monitoring and Post Request for Bids Open - National 420,000.00 0.00 Implementati 2021-08-22 2021-08-27 2021-10-08 2021-11-07 2021-12-12 2022-06-10 equipment and consumables Envelope Evaluation on for Project Management Team TZ-MOEST-TZ-235161-GO- RFB / Procurement of ICT Component 1: Empowering Pending Single Stage - One equipment for information IDA / 65340 Girls Through Secondary Post Request for Bids Open - National 500,000.00 0.00 Implementati 2021-07-31 2021-08-19 2021-09-18 Envelope system to track secondary Education and Life Skills on dropout (for IAE center) TZ-MOEST-TZ-235158-GO- Component 4: Project Pending RFQ / Procurement of Office Request for Single Stage - One IDA / 65340 Coordination, Monitoring and Post Limited 100,000.00 0.00 Implementati 2021-09-04 2021-10-30 2022-04-28 furniture and fittings for Quotations Envelope Evaluation on project management team NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MOEST-TZ-235087-CS- QCBS / Consultancy services Component 1: Empowering for development of Quality And Cost- Pending IDA / 65340 Girls Through Secondary Post Open - National 400,000.00 0.00 2021-08-31 2021-09-21 2021-11-04 2021-12-02 2022-01-01 2022-02-05 2022-03-12 2023-03-12 guidelines, training modules, Based Selection Implementation Education and Life Skills training of trainers and monitoring tools for Safe School Model TZ-MOEST-TZ-235222-CS- QCBS / Consultancy Services for development of costed Component 1: Empowering Quality And Cost- Pending plan for improving learning IDA / 65340 Girls Through Secondary Post Open - National 450,000.00 0.00 2021-08-31 2021-09-21 2021-11-04 2021-12-02 2022-01-01 2022-02-05 2022-03-12 2023-03-12 Based Selection Implementation outcome for secondary Education and Life Skills school’s student aligned with inclusive education strategy TZ-MOEST-TZ-235224-CS- QCBS / Consultancy Services Component 2: Digitally- Quality And Cost- Pending for development of national IDA / 65340 Enabled Effective Teaching Post Open - National 490,000.00 0.00 2021-10-18 2021-11-08 2021-12-22 2022-01-19 2022-02-18 2022-03-25 2022-04-29 2023-04-29 Based Selection Implementation secondary school teacher and Learning deployment strategy TZ-MOEST-TZ-235229-CS- QCBS / Consultancy services Component 2: Digitally- Quality And Cost- Pending for development of national IDA / 65340 Enabled Effective Teaching Post Open - National 400,000.00 0.00 2021-11-22 2021-12-13 2022-01-26 2022-02-23 2022-03-25 2022-04-29 2022-06-03 2023-06-03 Based Selection Implementation ICT strategy and costed plan and Learning for implementation TZ-MOEST-TZ-235231-CS- QCBS / Consultancy Services Component 3: Reducing for development of guidelines Barriers to Girls' Education Quality And Cost- Pending IDA / 65340 Post Open - National 450,000.00 0.00 2022-02-15 2022-03-08 2022-04-21 2022-05-19 2022-06-18 2022-07-23 2022-08-27 2023-08-27 and tools for carrying out through Facilitating Access to Based Selection Implementation learning Evaluation for Secondary Schools Secondary Schools TZ-MOEST-TZ-235234-CS- QCBS / Consultancy Services Component 1: Empowering for training of Tutors on Quality And Cost- Pending IDA / 65340 Girls Through Secondary Post Open - National 370,000.00 0.00 2022-01-25 2022-02-15 2022-03-31 2022-04-28 2022-05-28 2022-07-02 2022-08-06 2023-08-06 information systems to track Based Selection Implementation Education and Life Skills secondary school dropout (for IAE center) TZ-MOEST-TZ-235238-CS- QCBS / Consultancy Services Component 3: Reducing for training on School Barriers to Girls' Education Quality And Cost- Pending Construction Strategy and IDA / 65340 Post Open - National 420,000.00 0.00 2021-09-20 2021-10-11 2021-11-24 2021-12-22 2022-01-21 2022-02-25 2022-04-01 2023-04-01 through Facilitating Access to Based Selection Implementation ESSF to LGA, Head of Schools Secondary Schools and School construction committee. Page 1 TZ-MOEST-TZ-235241-CS- QCBS / Consultancy services for provision of technical Component 4: Project Quality And Cost- Pending Assistance to support overall IDA / 65340 Coordination, Monitoring and Post Open - National 490,000.00 0.00 2021-11-15 2021-12-06 2022-01-19 2022-02-16 2022-03-18 2022-04-22 2022-05-27 2023-05-27 Based Selection Implementation project coordination and M&E, Evaluation including conducting a capacity assessment TZ-MOEST-TZ-235256-CS- Component 4: Project QCBS / Consultancy Service Quality And Cost- Pending IDA / 65340 Coordination, Monitoring and Prior Open - National 485,000.00 0.00 2021-07-30 2021-08-20 2021-10-03 2021-10-31 2021-11-30 2022-01-04 2022-02-08 2023-02-08 for Provision of Independent Based Selection Implementation Evaluation Project Verification INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 AR Chronic Conditions and Injuries (P133193) Argentina, IBRD/IDA, FY: 2015, Team Leader(s): Maria Eugenia Bonilla-Chacin, Luis Orlando Perez , Lending Instrument: Investment Project Financing • PROCUREMENT Argentina : Protecting Vulnerable People Against Noncommunicable Diseases Project PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2017-04-03 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P133193 GPN Date: Project Name: Protecting Vulnerable People Against Noncommunicable Diseases Project Loan / Credit No: IBRD / 85080, / Ministry of Health Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Document Amount Amount Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion Type (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-1-B-CP / improve surveillance, Request for 2017-01- 2017-03- 2017-11- 2017-04- IBRD / 85080 Post Limited - National 83,031.25 45,503.90 Signed Equipamiento Informático monitoring, promotion, Quotations 24 16 27 30 prevention and control of NCDs, injuries, and risk factors. AR-NA-10-B-LPN / KIT PARA 2019-04- 2019-05- 2019-06- 2019-08- 2019-08- 2019-11- DESARROLLO DE ACTIVIDAD / Post Request for Bids Open - National 173,191.62 0.00 Canceled 18 03 07 06 31 29 FÍSICA 2019 Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-2-B-CP / improve surveillance, Request for Single Stage - One 2017-09- 2017-11- 2018-06- 2018-01- IBRD / 85080 Post Limited - National 95,000.00 35,760.31 Signed EQUIPAMIENTO OFICINA monitoring, promotion, Quotations Envelope 14 29 19 13 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-9-B-LPN / KIT PARA improve surveillance, Single Stage - One 2017-09- 2017-10- 2017-11- 2017-11- 2018-01- 2018-02- 2018-05- DESARROLLO DE ACTIVIDAD IBRD / 85080 Post Request for Bids Open - National 346,383.00 0.00 Canceled monitoring, promotion, Envelope 25 10 30 14 13 07 08 FÍSICA 2017 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-18969-GO-RFB / improve surveillance, Single Stage - One 2017-11- 2017-12- 2017-11- 2018-01- 2018-03- 2018-04- 2018-08- IBRD / 85080 Post Request for Bids Open - National 3,010,700.00 0.00 Canceled Espirómetros y accesorios monitoring, promotion, Envelope 24 10 30 14 15 09 07 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-34714-GO-RFB / improve surveillance, Single Stage - One 2017-11- 2017-12- 2017-11- 2018-01- 2018-03- 2018-04- 2018-06- IBRD / 85080 Post Request for Bids Open - National 781,887.29 0.00 Canceled Adquisición de Gazebos monitoring, promotion, Envelope 25 10 30 14 15 09 08 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-34717-GO-RFP / improve surveillance, Request for Single Stage - One 2017-11- 2018-02- 2018-03- Adquisición de IBRD / 85080 Post Open - National 48,360.00 0.00 Canceled monitoring, promotion, Quotations Envelope 22 06 23 monofilamentos prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-34719-GO-RFB / improve surveillance, Single Stage - One 2017-11- 2017-11- 2017-12- 2017-11- 2018-01- 2018-01- 2018-03- 2018-03- 2018-04- 2018-06- 2019-10- Adquisición de Test de sangre IBRD / 85080 Post Request for Bids Open - National 850,000.00 639,000.00 Signed monitoring, promotion, Envelope 25 28 10 30 14 10 15 12 09 25 01 oculta prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-34723-GO-RFB / Ministries of Health to Equipamiento para el STEP 2 y improve surveillance, Single Stage - One 2017-11- 2017-11- 2017-12- 2017-11- 2018-01- 2018-02- 2018-03- 2018-03- 2018-04- 2018-06- 2018-06- IBRD / 85080 Post Request for Bids Open - National 300,000.00 90,646.71 Signed 3 de la encuesta de monitoring, promotion, Envelope 25 29 10 30 14 05 15 27 09 25 08 mediciones objetivas prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-13413-GO-RFB / improve surveillance, Open - Single Stage - One 2018-02- 2018-02- 2018-04- 2018-07- 2018-08- 2019-02- IBRD / 85080 Prior Request for Bids 18,019,891.89 0.00 Canceled Estaciones Saludables monitoring, promotion, International Envelope 08 23 09 02 09 05 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-13-B-LPI / improve surveillance, Open - Single Stage - One 2017-09- 2017-09- 2017-11- 2018-02- 2018-03- 2018-07- Adquisición de PC all in one IBRD / 85080 Prior Request for Bids 4,052,895.20 0.00 Canceled monitoring, promotion, International Envelope 11 26 10 02 12 10 para caps prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-55434-GO-RFB / improve surveillance, Single Stage - One 2018-04- 2018-06- 2018-05- 2018-06- 2018-07- 2018-08- 2018-07- 2018-09- 2018-10- 2019-01- Adquisición de PC All in One IBRD / 85080 Post Request for Bids Open - National 1,482,646.23 1,111,196.83 Signed monitoring, promotion, Envelope 25 01 10 14 13 13 31 07 16 05 para CAPS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-52279-GO-RFB / improve surveillance, Single Stage - One 2018-04- 2018-05- 2018-05- 2018-06- 2018-07- 2018-08- 2018-07- 2018-09- 2018-10- 2019-01- IBRD / 85080 Post Request for Bids Open - National 247,843.68 468,834.95 Signed Estaciones Saludables monitoring, promotion, Envelope 26 29 11 15 12 14 23 08 05 06 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-6-B-LPI / improve surveillance, Open - Single Stage - One 2017-09- 2017-10- 2017-09- 2018-01- 2017-11- 2017-12- 2018-01- 2018-03- 2018-06- IBRD / 85080 Prior Request for Bids 14,807,204.00 0.00 Canceled ADQUISICION DE MOVILES monitoring, promotion, International Envelope 08 31 23 09 07 27 30 09 07 prevention and control of NCDs, injuries, and risk factors. Page 1 Component 3: Supporting the National and Provincial AR-MSAL-60905-GO-RFQ / Ministries of Health to Equipamiento para el STEP 2 y improve surveillance, Request for Single Stage - One 2018-05- 2018-07- 2018-09- 2018-09- 3 de la encuesta de IBRD / 85080 Post Open - National 58,307.20 37,447.47 Signed monitoring, promotion, Quotations Envelope 11 26 05 09 mediciones objetivas prevention and control of (renglones desiertos) NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-26176-GO-RFB / improve surveillance, Open - Single Stage - One 2017-10- 2017-10- 2017-12- 2018-03- 2018-04- 2019-03- Adquisición de colonoscopios IBRD / 85080 Prior Request for Bids 6,281,000.00 0.00 Canceled monitoring, promotion, International Envelope 09 24 08 02 04 30 e insumos - INC prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-34715-GO-RFB / improve surveillance, Single Stage - One 2017-11- 2017-12- 2017-11- 2018-01- 2018-03- 2018-04- 2018-06- Adquisición de tensiometros IBRD / 85080 Post Request for Bids Open - National 199,440.00 0.00 Canceled monitoring, promotion, Envelope 25 10 30 14 15 09 08 y balanzas prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-60914-GO-RFB / improve surveillance, Single Stage - One 2018-06- 2018-07- 2018-08- 2018-10- 2018-11- 2019-05- Adquisición de colonoscopios IBRD / 85080 Prior Request for Bids Open - National 4,173,303.11 0.00 Canceled monitoring, promotion, Envelope 18 03 07 16 14 13 e insumos- INC prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-70188-GO-RFB / Under improve surveillance, Open - Single Stage - One 2018-08- 2018-12- 2018-09- 2019-01- 2018-10- 2019-02- 2019-01- 2019-02- 2019-08- Adquisición de colonoscopios IBRD / 85080 Prior Request for Bids 4,130,500.00 0.00 Implementati monitoring, promotion, International Envelope 18 17 02 09 17 22 09 16 15 e insumos- INC on prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-26166-GO-RFB / improve surveillance, Open - Single Stage - One 2018-01- 2018-02- 2018-03- 2018-06- 2018-07- 2018-11- IBRD / 85080 Prior Request for Bids 4,884,595.80 0.00 Canceled Notebook y Tablets para Caps monitoring, promotion, International Envelope 25 09 26 18 26 23 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-7-B-LPI / GIMNASIOS improve surveillance, Open - Single Stage - One 2017-09- 2017-09- 2017-11- 2018-02- 2018-03- 2018-07- IBRD / 85080 Prior Request for Bids 14,615,567.32 0.00 Canceled AL AIRE LIBRE monitoring, promotion, International Envelope 10 25 09 01 11 09 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-14591-GO-RFB / improve surveillance, Open - Single Stage - One 2018-01- 2018-02- 2018-03- 2018-06- 2018-07- 2018-11- IBRD / 85080 Prior Request for Bids 6,909,901.60 0.00 Canceled Instrumental Médico monitoring, promotion, International Envelope 25 09 26 18 26 23 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to improve surveillance, Open - Single Stage - One 2017-09- 2017-09- 2017-11- 2018-02- 2018-03- 2018-07- AR-NA-8-B-LPI / BICICLETAS IBRD / 85080 Prior Request for Bids 5,217,310.55 0.00 Canceled monitoring, promotion, International Envelope 11 26 10 02 12 10 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-60917-GO-RFQ / improve surveillance, Request for Single Stage - One 2018-05- 2018-08- 2018-11- IBRD / 85080 Post Open - National 26,461.40 0.00 Canceled Adquisición de Tensiometros monitoring, promotion, Quotations Envelope 18 02 30 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-52282-GO-RFQ / improve surveillance, Request for Single Stage - One 2018-04- 2018-07- 2018-08- Adquisición de tablets para la IBRD / 85080 Post Open - National 71,592.00 0.00 Canceled monitoring, promotion, Quotations Envelope 22 07 06 realización de la ENNyS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-12-B-LPN / improve surveillance, Single Stage - One 2018-02- 2018-02- 2018-04- 2018-06- 2018-06- 2018-10- EQUIPAMIENTO IBRD / 85080 Post Request for Bids Open - National 2,844,000.00 0.00 Canceled monitoring, promotion, Envelope 11 26 02 01 26 24 LABORATORIO prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-14592-GO-RFQ / improve surveillance, Request for Single Stage - One 2017-11- 2018-02- 2018-03- Equipamiento Informático IBRD / 85080 Post Open - National 80,000.00 0.00 Canceled monitoring, promotion, Quotations Envelope 22 06 23 para DENT prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-14593-GO-RFB / improve surveillance, Open - Single Stage - One 2017-10- 2017-10- 2017-12- 2018-03- 2018-04- 2018-08- IBRD / 85080 Prior Request for Bids 9,678,126.72 0.00 Canceled Adquisición de medicamentos monitoring, promotion, International Envelope 09 24 08 02 09 07 prevention and control of NCDs, injuries, and risk factors. Component 1: Improving the readiness of public health care facilities to provide 80-0002-CDI17 / higher quality services for 2020-08- 2017-06- 2020-08- 2017-03- 2020-10- 2018-02- 2021-04- IBRD / 85080 Post Direct Selection Direct 2,019,673.39 1,803,762.14 Signed Adquisición de Trastuzumab NCDs for vuln erable 25 01 30 14 04 03 02 population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health care facilities to provide 80-0034-CDI18 / higher quality services for 2020-08- 2018-01- 2020-08- 2018-05- 2020-10- 2018-08- 2021-04- IBRD / 85080 Post Direct Selection Direct 203,160.60 181,441.91 Signed Adquisición de ciclosporina NCDs for vuln erable 26 18 31 08 05 02 03 population groups and expanding the scope of selected services. Page 2 Component 1: Improving the readiness of public health care facilities to provide 80-0063-CDI18 / higher quality services for 2020-08- 2018-09- 2020-08- 2018-11- 2020-10- 2019-02- 2021-04- IBRD / 85080 Post Direct Selection Direct 180,367.79 622,873.29 Signed Adquisición de Sunitinib. NCDs for vuln erable 26 19 31 14 05 07 03 population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health care facilities to provide 80-0007-LPU17 / higher quality services for Single Stage - One 2020-08- 2017-06- 2020-08- 2020-09- 2017-07- 2021-01- 2017-07- 2021-03- 2018-02- 2021-09- Adquisición de medicamentos IBRD / 85080 Post Request for Bids Open - National 2,468,627.87 2,204,721.26 Signed NCDs for vuln erable Envelope 24 01 25 09 21 07 21 23 02 19 inmunosupresores population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health 80-0028-LPU17 / care facilities to provide Adquisición de medicamentos higher quality services for Single Stage - One 2020-08- 2018-02- 2020-08- 2020-10- 2018-06- 2020-11- 2018-11- 2020-12- 2019-03- 2021-06- IBRD / 85080 Post Request for Bids Open - National 3,581,200.87 3,557,240.81 Signed inmusupresores INCUCAI NCDs for vuln erable Envelope 25 01 30 11 25 10 28 15 14 13 2018-2019 population groups and expanding the scope of selected services. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-136976-GO-RFB / improve surveillance, Single Stage - One 2019-10- 2019-11- 2019-12- 2020-02- 2020-03- 2021-01- Adquisición de parches de IBRD / 85080 Post Request for Bids Open - National 950,000.00 0.00 Canceled monitoring, promotion, Envelope 25 09 14 12 08 02 nicotina prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-124339-GO-RFB / improve surveillance, Single Stage - One 2019-10- 2019-10- 2019-11- 2020-01- 2020-02- 2020-06- Adquisición de tensiometros IBRD / 85080 Post Request for Bids Open - National 1,641,570.00 0.00 Canceled monitoring, promotion, Envelope 10 25 29 28 22 21 y balanzas prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to Under AR-MSAL-200459-GO-RFB / improve surveillance, Open - Single Stage - One 2021-01- 2021-06- 2021-01- 2021-06- 2021-02- 2021-02- 2021-03- 2021-04- IBRD / 85080 Prior Request for Bids 9,340,000.00 0.00 Implementati Adquisición de PC monitoring, promotion, International Envelope 07 15 12 17 11 21 13 27 on prevention and control of NCDs, injuries, and risk factors. Component 2: Protecting AR-MSAL-201408-GO-RFQ / Pending vulnerable population groups Request for Single Stage - One 2021-01- 2021-03- 2021-03- Adquisición de Test Sangro IBRD / 85080 Post Open - National 89,600.00 0.00 Implementati against prevalent NCD risk Quotations Envelope 16 13 16 Oculta en Materia Fecal on factors. Component 1: Improving the readiness of public health 80-0027-LPU17 / care facilities to provide Under Medicamentos Esenciales higher quality services for Single Stage - One 2020-12- 2020-12- 2021-02- 2021-03- 2021-04- 2021-10- IBRD / 85080 Post Request for Bids Open - National 4,957,679.62 0.00 Implementati para el Primer Nivel de NCDs for vuln erable Envelope 16 21 01 03 07 04 on Atención population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health care facilities to provide 80-0029-CDI18 / higher quality services for 2020-12- 2018-01- 2020-12- 2018-05- 2021-01- 2019-01- 2021-07- IBRD / 85080 Post Direct Selection Direct 9,289.37 36,024.98 Signed Adquisición de Vinorelbina NCDs for vuln erable 16 18 21 23 25 29 24 population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health 80-0024-LPU17 / care facilities to provide ADQUISICION DE higher quality services for Single Stage - One 2020-12- 2018-04- 2020-12- 2021-02- 2018-04- 2021-03- 2018-04- 2021-04- 2019-02- 2021-10- IBRD / 85080 Post Request for Bids Open - National 2,583,252.98 1,893,264.02 Signed MEDICAMENTOS NCDs for vuln erable Envelope 16 03 21 01 20 03 26 07 04 04 ONCOLOGICOS population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health 80-0004-CDI18 / care facilities to provide ADQUISICION DE HORMONA higher quality services for 2020-12- 2016-09- 2020-12- 2018-01- 2021-01- 2018-03- 2021-07- IBRD / 85080 Post Direct Selection Direct 38,411.91 41,166.62 Signed DE CRECIMIENTO NCDs for vuln erable 16 27 21 26 25 19 24 SOMATOTROFINA population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health care facilities to provide 80-0017-LPU18 / Under higher quality services for Single Stage - One 2020-12- 2018-10- 2020-12- 2021-02- 2018-11- 2021-03- 2019-03- 2021-04- 2021-10- Adquisición Medicamentos IBRD / 85080 Post Request for Bids Open - National 1,958,398.97 0.00 Implementati NCDs for vuln erable Envelope 18 29 23 03 21 05 19 09 06 Oncológicos on population groups and expanding the scope of selected services. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-212405-GO-RFQ / Under improve surveillance, Request for Single Stage - One 2021-05- 2021-07- 2021-09- Adquisición de Tensiómetros IBRD / 85080 Post Open - National 59,100.00 0.00 Implementati monitoring, promotion, Quotations Envelope 12 06 04 Automáticos on prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-124340-GO-RFB / improve surveillance, Single Stage - One 2019-08- 2019-09- 2019-10- 2019-12- 2020-01- 2020-06- Adquisición de IBRD / 85080 Post Request for Bids Open - National 188,609.00 0.00 Canceled monitoring, promotion, Envelope 26 10 15 14 08 06 monofilamentos prevention and control of NCDs, injuries, and risk factors. Component 1: Improving the readiness of public health care facilities to provide AR-MSAL-201407-GO-RFB / Pending higher quality services for Single Stage - One 2021-06- 2021-06- 2021-07- 2021-07- 2021-08- 2022-02- Adquisición de Test de VPH y IBRD / 85080 Post Request for Bids Open - National 2,895,690.72 0.00 Implementati NCDs for vuln erable Envelope 04 09 09 29 27 23 colectores DNA on population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health AR-MSAL-234252-GO-RFB / care facilities to provide Under Adquisición de Medicamentos higher quality services for Open - Single Stage - One 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2021-12- IBRD / 85080 Prior Request for Bids 8,855,541.15 0.00 Implementati para Patologías Oncológicas - NCDs for vuln erable International Envelope 31 05 20 19 29 28 on BDE population groups and expanding the scope of selected services. Component 1: Improving the readiness of public health care facilities to provide AR-MSAL-231566-GO-RFB / Pending higher quality services for Open - Single Stage - One 2021-06- 2021-07- 2021-09- 2021-10- 2021-12- 2022-03- Adquisición de equipamiento IBRD / 85080 Prior Request for Bids 6,130,329.80 0.00 Implementati NCDs for vuln erable International Envelope 21 06 04 14 03 03 médico para el INC on population groups and expanding the scope of selected services. Page 3 Component 3: Supporting the National and Provincial AR-MSAL-124334-GO-RFB / Ministries of Health to Adquisición del equipamiento improve surveillance, Single Stage - One 2019-10- 2019-10- 2019-11- 2020-01- 2020-02- 2021-02- IBRD / 85080 Post Request for Bids Open - National 203,350.00 0.00 Canceled necesario para la realización monitoring, promotion, Envelope 10 25 29 28 22 16 de Espirometría prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-201406-GO-RFB / Ministries of Health to Pending Adquisición de improve surveillance, Single Stage - One 2021-08- 2021-08- 2021-09- 2021-10- 2021-11- 2022-01- IBRD / 85080 Post Request for Bids Open - National 453,804.00 0.00 Implementati Monofilamentos de Semmes- monitoring, promotion, Envelope 07 12 11 11 11 10 on Weinstein prevention and control of NCDs, injuries, and risk factors. Component 1: Improving the readiness of public health AR-MSAL-201404-GO-RFQ / care facilities to provide Pending Adquisición de Equipamiento higher quality services for Single Stage - One 2021-07- 2021-07- 2021-08- 2021-08- 2021-09- 2021-12- IBRD / 85080 Post Request for Bids Open - National 448,000.00 0.00 Implementati para el abordaje territorial de NCDs for vuln erable Envelope 01 06 05 30 28 27 on población indígena population groups and expanding the scope of selected services. Component 3: Supporting the National and Provincial AR-MSAL-201405-NC-RFB / Ministries of Health to Adquisición de Hardware y improve surveillance, Single Stage - One 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2021-11- Software para nueva IBRD / 85080 Post Request for Bids Open - National 1,289,200.00 0.00 Canceled monitoring, promotion, Envelope 17 22 21 11 01 08 infraestructura en el marco de prevention and control of la escalabilidad del proyecto NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-147029-GO-RFB / Ministries of Health to Equipamiento para la improve surveillance, Single Stage - One 2019-12- 2020-01- 2020-02- 2020-04- 2020-05- 2020-07- IBRD / 85080 Post Request for Bids Open - National 150,000.00 0.00 Canceled determinación de sodio de monitoring, promotion, Envelope 23 07 11 11 06 05 alimentos prevention and control of NCDs, injuries, and risk factors. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-25-S-LPN / improve surveillance, Single Stage - One 2017-10- 2017-10- 2017-11- 2017-12- 2018-01- 2018-03- 2018-02- 2018-04- 2018-05- 2018-10- ENCUESTA DE VIGILANCIA IBRD / 85080 Post Request for Bids Open - National 1,600,000.00 95,043.59 Signed monitoring, promotion, Envelope 09 24 30 08 09 02 19 09 08 06 TELEFONICA prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-26177-NC-RFB / improve surveillance, Single Stage - One 2017-09- 2017-10- 2017-11- 2017-11- 2018-01- 2018-01- 2018-03- IBRD / 85080 Post Request for Bids Open - National 331,809.00 0.00 Canceled Material de promoción monitoring, promotion, Envelope 18 03 29 07 06 31 17 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-38858-NC-RFB / improve surveillance, Single Stage - One 2017-11- 2017-11- 2017-12- 2018-01- 2018-02- 2018-03- 2018-02- 2018-04- 2018-05- 2018-07- Encuesta de mediciones IBRD / 85080 Post Request for Bids Open - National 1,600,346.00 1,690,000.00 Signed monitoring, promotion, Envelope 30 30 11 15 05 16 23 10 07 09 objetivas prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-52281-NC-RFB / improve surveillance, Single Stage - One 2018-04- 2018-04- 2018-04- 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-08- 2019-03- Mediciones bioquimicas para IBRD / 85080 Post Request for Bids Open - National 500,000.00 231,638.41 Signed monitoring, promotion, Envelope 11 03 26 31 11 30 21 24 03 22 la ENNyS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-34725-NC-RFB / Ministries of Health to Encuesta nacional de improve surveillance, Single Stage - One 2018-02- 2018-03- 2018-04- 2018-06- 2018-07- 2019-05- Nutrición y Salud y primera IBRD / 85080 Prior Request for Bids Open - National 4,500,000.00 0.00 Canceled monitoring, promotion, Envelope 18 05 09 17 12 08 encuesta nacional de prevention and control of consumo de alimentos NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-18977-NC-RFB / improve surveillance, Single Stage - One 2017-11- 2017-11- 2017-12- 2018-03- 2018-03- 2018-07- Realización de eventos IBRD / 85080 Post Request for Bids Open - National 120,000.00 0.00 Canceled monitoring, promotion, Envelope 11 26 31 01 26 24 deportivos prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-34720-NC-RFB / improve surveillance, Single Stage - One 2017-11- 2017-12- 2018-01- 2018-03- 2018-04- 2018-05- Material de merchandising - IBRD / 85080 Post Request for Bids Open - National 663,581.00 0.00 Canceled monitoring, promotion, Envelope 25 10 14 15 09 24 Campaña 2 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-18980-NC-RFB / improve surveillance, Single Stage - One 2018-01- 2018-01- 2018-03- 2018-06- 2018-07- 2018-10- Impresiones de tripticos, IBRD / 85080 Post Request for Bids Open - National 1,668,191.00 0.00 Canceled monitoring, promotion, Envelope 08 23 09 01 09 07 banners y otros prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-NA-50-S-CP / Ministries of Health to IMPRESIONES MATERIAL ENT Y improve surveillance, Request for Single Stage - One 2018-04- 2018-06- 2018-07- IBRD / 85080 Post Limited - National 60,000.00 0.00 Canceled ABORDAJE CON PUEBLOS monitoring, promotion, Quotations Envelope 18 06 21 INDÍGENAS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-24-S-LPN / improve surveillance, 2018-01- 2018-01- 2018-03- 2018-05- 2018-05- 2018-08- IBRD / 85080 Post Request for Bids Open - National 1,600,000.00 0.00 Canceled IMPRESIONES monitoring, promotion, 11 26 02 01 26 24 prevention and control of NCDs, injuries, and risk factors. Page 4 Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-18979-NC-RFB / improve surveillance, Single Stage - One 2017-10- 2017-11- 2017-12- 2018-02- 2018-03- 2019-01- Análisis químicos y tabla de IBRD / 85080 Post Request for Bids Open - National 1,600,000.00 0.00 Canceled monitoring, promotion, Envelope 25 09 14 12 09 03 composición de alimentos prevention and control of NCDs, injuries, and risk factors. Component 1: Improving the readiness of public health AR-MSAL-237622-NC-RFQ / care facilities to provide Contratación del servicio de Pending higher quality services for Request for Single Stage - One 2021-07- 2021-09- 2021-12- realización de la “2° Encuesta IBRD / 85080 Post Open - National 85,000.00 0.00 Implementati NCDs for vuln erable Quotations Envelope 01 11 10 Nacional de Vigilancia on population groups and Telefónica (Vigitel 2021)” expanding the scope of selected services. Component 3: Supporting the National and Provincial AR-MSAL-201411-NC-DIR / Ministries of Health to Capacitaciones para la improve surveillance, 2021-03- 2021-04- 2021-05- 2021-11- plataforma virtual de IBRD / 85080 Post Direct Selection Direct 24,500.00 0.00 Canceled monitoring, promotion, 27 11 16 12 estandares de prevention and control of interioperatibilidad HL7-FHIR NCDs, injuries, and risk factors. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-15-CF-SBCC / improve surveillance, Quality And Cost- Open - 2017-01- 2017-05- 2016-07- 2017-11- 2016-08- 2017-12- 2017-05- 2018-06- 2017-07- 2018-08- 2017-08- 2018-09- 2019-01- IBRD / 85080 Prior 2,880,000.00 584,460.13 Signed AUDITORIA OPERATIVA monitoring, promotion, Based Selection International 05 08 26 21 09 20 21 27 18 16 28 12 18 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-14-CF-SBCC / improve surveillance, Quality And Cost- 2016-11- 2017-02- 2017-09- 2017-10- 2017-06- 2017-11- 2017-07- 2017-12- 2017-08- 2018-02- 2018-02- AUDITORIA DE PROGRAMAS IBRD / 85080 Post Open - National 600,000.00 418,916.67 Signed monitoring, promotion, Based Selection 11 13 26 24 10 09 14 22 14 06 10 ELEGIBLES prevention and control of NCDs, injuries, and risk factors. AR-NA-18-CF-SBCC / Quality And Cost- 2017-03- 2017-07- 2017-08- 2017-09- 2018-03- ENCUESTA DE VIGILANCIA / Post Open - National 230,000.00 0.00 Canceled Based Selection 15 10 13 13 12 LESIONES Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-26193-CS-QCBS / improve surveillance, Quality And Cost- Open - 2017-11- 2017-11- 2017-12- 2018-01- 2018-03- 2018-04- 2018-05- 2018-11- Encuesta de mediciones IBRD / 85080 Post 1,700,000.00 0.00 Canceled 2017-11-15 monitoring, promotion, Based Selection International 30 30 30 31 27 30 31 17 objetivas prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-26198-CS-QCBS / the National and Provincial Convocatoria de programas Ministries of Health to de implementación, improve surveillance, Quality And Cost- Open - 2017-10- 2017-12- 2018-01- 2018-02- 2018-04- 2018-05- 2018-11- IBRD / 85080 Prior 2,000,000.00 0.00 Canceled 2017-10-15 diseminación y escalamiento monitoring, promotion, Based Selection International 30 23 25 23 20 28 24 de estrategias clínicas para prevention and control of disminución del tabaquismo. NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-26197-CS-QCBS / the National and Provincial Convocatoria de programas Ministries of Health to de implementación, improve surveillance, Quality And Cost- Open - 2017-10- 2017-12- 2018-01- 2018-02- 2018-04- 2018-05- 2018-11- diseminación y escalamiento IBRD / 85080 Prior 5,000,000.00 0.00 Canceled 2017-10-15 monitoring, promotion, Based Selection International 30 23 25 23 20 28 24 de estrategias clínicas prevention and control of parareducción de NCDs, injuries, and risk hipertensión factors. Component 3: Supporting the National and Provincial AR-MSAL-26196-CS-QCBS / Ministries of Health to Implementación del plan de improve surveillance, Quality And Cost- Open - 2017-12- 2018-01- 2018-02- 2018-04- 2018-05- 2018-06- 2019-02- diseminación e implantación IBRD / 85080 Post 1,600,000.00 0.00 Canceled 2017-12-01 monitoring, promotion, Based Selection International 16 15 16 12 16 16 11 de las guías de práctica prevention and control of clínica NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-18984-CS-QCBS / Ministries of Health to Paquetes de revisiones improve surveillance, Quality And Cost- 2017-12- 2017-12- 2018-01- 2018-03- 2018-04- 2018-05- 2018-11- IBRD / 85080 Post Open - National 400,000.00 0.00 Canceled 2017-11-11 sistemáticas sobre impacto monitoring, promotion, Based Selection 11 28 27 23 26 27 23 de políticas de ENT prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-18982-CS-QCBS / Ministries of Health to Estudio de carga de improve surveillance, Quality And Cost- 2017-12- 2017-12- 2018-01- 2018-03- 2018-04- 2018-05- 2018-09- enfermedades y evaluaciones IBRD / 85080 Post Open - National 100,000.00 0.00 Canceled 2017-11-11 monitoring, promotion, Based Selection 11 28 27 23 26 27 24 económicas para estimar prevention and control of impacto de la ENT NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-20-CF-SBCC / Portal improve surveillance, Quality And Cost- 2018-01- 2018-03- 2018-03- 2018-04- 2018-05- 2018-06- 2018-07- 2018-11- web y herramientas IBRD / 85080 Post Open - National 198,995.70 0.00 Canceled 2018-01-15 monitoring, promotion, Based Selection 30 01 03 02 27 30 31 28 interactivas prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-NA-19-CF-SBCC / Ministries of Health to Monitoreo de implementación improve surveillance, Quality And Cost- 2018-01- 2018-02- 2018-02- 2018-03- 2018-05- 2018-06- 2018-07- 2018-10- IBRD / 85080 Post Open - National 70,000.00 0.00 Canceled 2018-01-01 de estrategia integral de monitoring, promotion, Based Selection 16 15 17 19 13 16 17 15 comunicación prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-26194-CS-QCBS / Ministries of Health to Propuestas de reformulación improve surveillance, Quality And Cost- 2017-12- 2018-01- 2018-02- 2018-04- 2018-05- 2018-06- 2018-10- de alimentos (tecnología de IBRD / 85080 Post Open - National 300,000.00 0.00 Canceled 2017-12-01 monitoring, promotion, Based Selection 16 07 08 14 18 08 06 alimentos) sodio, grasas trans prevention and control of y azúcar NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-26182-CS-QCBS / Ministries of Health to Estudio cuali/cuantitativo de improve surveillance, Quality And Cost- 2017-09- 2017-10- 2017-11- 2018-01- 2018-02- 2018-03- 2018-07- IBRD / 85080 Post Open - National 280,000.00 0.00 Canceled 2017-09-01 evaluación de rotulado frontal monitoring, promotion, Based Selection 16 08 09 13 16 09 07 de alimentos prevention and control of NCDs, injuries, and risk factors. Page 5 Component 3: Supporting the National and Provincial AR-NA-22-CF-SBCC / Ministries of Health to Comunicación educativa para improve surveillance, Quality And Cost- 2018-04- 2018-07- 2018-08- 2018-09- 2018-12- IBRD / 85080 Post Open - National 50,000.00 0.00 Canceled niños, niñas y adolescentes monitoring, promotion, Based Selection 12 13 16 16 15 Línea de Tabaco prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-26191-CS-QCBS / the National and Provincial Consultoría para el estudio Ministries of Health to cuanti cualitativo sobre improve surveillance, Quality And Cost- 2017-09- 2017-10- 2017-11- 2018-01- 2018-02- 2018-03- 2018-07- percepciones información y IBRD / 85080 Post Open - National 280,000.00 0.00 Canceled 2017-09-01 monitoring, promotion, Based Selection 16 08 09 13 16 09 07 representaciones de la prevention and control of población con relación a las NCDs, injuries, and risk ENT y la comunicación factors. Component 3: Supporting the National and Provincial AR-NA-17-CF-SBCC / Ministries of Health to DESARROLLO DE LA improve surveillance, Quality And Cost- 2017-10- 2017-11- 2017-11- 2017-12- 2018-02- 2018-03- 2018-04- 2018-10- IBRD / 85080 Post Open - National 200,000.00 0.00 Canceled 2017-10-01 ESTRATEGIA DE LA LINEA monitoring, promotion, Based Selection 31 17 17 17 10 16 16 13 0800 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-NA-21-CF-SBCC / Plan improve surveillance, Quality And Cost- 2018-02- 2018-03- 2018-03- 2018-04- 2018-05- 2018-06- 2018-07- 2019-01- de eventos y marketing IBRD / 85080 Post Open - National 500,000.00 0.00 Canceled 2018-01-15 monitoring, promotion, Based Selection 14 01 03 02 27 30 31 27 directo Salud y ENT prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-26195-CS-QCBS / Ministries of Health to Propuesta de evaluación de la improve surveillance, Quality And Cost- 2017-12- 2018-01- 2018-02- 2018-04- 2018-05- 2018-06- 2018-10- IBRD / 85080 Post Open - National 300,000.00 0.00 Canceled 2017-12-01 regulación de productos de monitoring, promotion, Based Selection 16 07 08 14 18 08 06 tabaco prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-124345-CS-QCBS improve surveillance, Quality And Cost- 2019-08- 2019-09- 2019-10- 2019-12- 2020-01- 2020-02- 2021-12- / Auditoria a Provincias 2019- IBRD / 85080 Post Open - National 500,000.00 0.00 Canceled 2019-08-01 monitoring, promotion, Based Selection 31 17 17 11 14 14 30 2022 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-124341-CS-QCBS improve surveillance, Quality And Cost- Open - 2020-02- 2019-09- 2020-05- 2019-10- 2019-11- 2019-12- 2020-01- 2020-03- 2021-12- IBRD / 85080 Prior 1,100,000.00 0.00 Canceled 2019-08-01 / Auditoria de IVT 2019-2022 monitoring, promotion, Based Selection International 19 15 14 12 11 10 26 13 28 prevention and control of NCDs, injuries, and risk factors. Component 1: Improving the readiness of public health care facilities to provide AR-MSAL-124341-CS-QCBS- higher quality services for Quality And Cost- 2020-05- 2020-09- 2020-10- 2020-11- 2020-11- 2020-12- 2020-12- 2020-12- 2021-02- 2021-02- 2021-03- 2021-04- 2022-03- IBRD / 85080 Post Open - National 668,905.00 149,128.52 Signed 2020-08-27 / Auditoría IVT 2019-2022 NCDs for vuln erable Based Selection 15 17 31 02 28 02 28 30 01 01 08 21 08 population groups and expanding the scope of selected services. Component 3: Supporting the National and Provincial Ministries of Health to Consultant AR-MSAL-201412-CS-QCBS improve surveillance, Under 2021-03- 2021-04- 2021-05- 2021-06- 2021-05- 2021-06- 2021-12- IBRD / 85080 Post Qualification Open - National 41,475.85 0.00 2021-03-13 / Auditoria PGE 2020 monitoring, promotion, Implementation 11 03 02 04 17 08 05 Selection prevention and control of NCDs, injuries, and risk factors. AR-MSAL-201410-CS-QCBS Component 2: Protecting / Adecuación del RITA, vulnerable population groups Quality And Cost- 2021-03- 2021-04- 2021-04- 2021-04- 2021-05- 2021-05- 2021-11- SITAM, crónicos y sanidad de IBRD / 85080 Post Open - National 936,400.00 0.00 Canceled 2021-02-26 against prevalent NCD risk Based Selection 12 02 16 23 07 21 17 fronteras con microservicios factors. interoperables INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-NA-35-CI-3CV / Contratación individual posición 'Responsable de la Individual Unidad de Articulación con la Pending 2016-05- 2020-12- / Post Consultant Limited 102,037.00 0.00 Dirección de Promoción y Implementation 01 31 Selection Control de Enfermedades No Transmisibles y las Provincias' (1 consultor) Component 3: Supporting the National and Provincial AR-NA-28-CI-3CV / Ministries of Health to Individual Contratación individual improve surveillance, 2016-06- 2016-05- 2017-04- 2020-12- IBRD / 85080 Post Consultant Limited 91,024.00 7,224.77 Signed posición 'Asesor Legal' (1 monitoring, promotion, 08 01 15 31 Selection consultor) prevention and control of NCDs, injuries, and risk factors. AR-NA-27-CI-3CV / Component 2: Protecting Individual Contratación individual vulnerable population groups 2016-06- 2016-05- 2017-12- 2020-12- 2018-10- IBRD / 85080 Post Consultant Limited 107,909.00 1,209.16 Terminated posición 'Coordinador against prevalent NCD risk 08 01 01 31 31 Selection General' (1 consultor) factors. AR-NA-45-CI-3CV / Contratación individual Individual Pending 2016-05- 2020-12- posición 'Staff Técnico para el / Post Consultant Limited 135,069.00 0.00 Implementation 01 31 Fortalecimiento del INAL' (2 Selection consultores) AR-NA-36-CI-3CV / Contratación individual posición 'Staff de Apoyo a la Individual Unidad de Articulación con la Pending 2016-05- 2020-12- / Post Consultant Limited 182,047.00 0.00 Dirección de Promoción y Implementation 01 31 Selection Control de Enfermedades No Transmisibles y las Provincias' (2 consultores) Component 3: Supporting AR-NA-40-CI-3CV / the National and Provincial Contratación individual Ministries of Health to Individual posición 'Staff Técnico de improve surveillance, 2017-05- 2017-05- 2016-05- 2017-08- 2020-12- IBRD / 85080 Post Consultant Limited 202,604.00 7,772.55 Signed Apoyo al Área de monitoring, promotion, 09 24 01 01 31 Selection reorientación de los Servicios prevention and control of de Salud' (3 consultores) NCDs, injuries, and risk factors. Page 6 AR-NA-55-CI-3CV / LO- Contratación individual posición 'Especialista Legal Senior para la puesta en Individual Pending 2016-07- 2016-12- marcha del Proyecto de / Post Consultant Limited 7,443.00 0.00 Implementation 01 31 Protección de la Población Selection Vulnerable contra las Enfermedades Crónicas No Transmisibles' (1 consultor) AR-NA-57-CI-3CV / LO- Contratación individual posición 'Staff de apoyo a la Individual Pending 2016-07- 2016-11- Unidad de Articulación con la / Post Consultant Limited 12,404.00 0.00 Implementation 01 30 Dirección de Promoción y Selection ECNT y Provincias' (2 consultores) AR-NA-62-CI-3CV / LO- Component 2: Protecting Especialista en Diseño de Individual vulnerable population groups 2017-09- 2017-01- 2017-10- 2017-12- 2018-03- Sistemas de Vigilancia de IBRD / 85080 Post Consultant Limited 22,427.00 2,774.18 Completed against prevalent NCD risk 25 01 01 31 31 Enfermedades Crónicas No Selection factors. Transmisibles (1 consultor) AR-NA-64-CI-3CV / LO- Apoyo funcional para la Individual Unidad de Articulación con la Pending 2017-01- 2017-12- / Post Consultant Limited 41,760.00 0.00 Dirección de Promoción y Implementation 01 31 Selection ECNT y Provincias (2 consultores) Component 3: Supporting the National and Provincial AR-NA-65-CI-3CV / LO- Ministries of Health to Individual Apoyo funcional a la unidad improve surveillance, 2017-05- 2017-01- 2017-07- 2017-12- IBRD / 85080 Post Consultant Limited 77,332.00 4,304.71 Signed de Monitoreo y evaluación (4 monitoring, promotion, 08 01 01 31 Selection consultores) prevention and control of NCDs, injuries, and risk factors. AR-NA-59-CI-3CV / LO- Individual Apoyo Funcional para la Pending 2017-01- 2017-12- / Post Consultant Limited 63,638.00 0.00 coordinación general (3 Implementation 01 31 Selection consultores) Component 3: Supporting the National and Provincial AR-NA-51-CI-3CV / LO- Ministries of Health to Contratación individual Individual improve surveillance, 2017-07- 2016-07- 2017-08- 2016-12- posición 'Staff de apoyo a la IBRD / 85080 Post Consultant Limited 22,328.00 2,741.87 Signed monitoring, promotion, 24 01 01 31 Coordinación General' (3 Selection prevention and control of consultores) NCDs, injuries, and risk factors. AR-NA-52-CI-3CV / LO- Contratación individual posición 'Asistencia técnica Individual para estudios de la Pending 2016-07- 2016-12- / Post Consultant Limited 10,031.00 0.00 estructura, elaboración de Implementation 01 31 Selection diagnóstico y desarrollo de un plan estratégico de ENT' (1 consultor) AR-NA-53-CI-3CV / LO- Contratación individual Individual posición 'Fortalecimiento de Pending 2016-07- 2016-12- / Post Consultant Limited 7,443.00 0.00 herramientas para la Implementation 01 31 Selection promoción en salud alimentaria' (1 consultor) AR-NA-63-CI-3CV / LO- Asesor Legal Senior para el Component 2: Protecting fortalecimiento del Proyecto Individual vulnerable population groups 2017-08- 2017-01- 2017-09- 2017-12- 2018-08- de Protección de la Población IBRD / 85080 Post Consultant Limited 17,786.00 2,657.28 Completed against prevalent NCD risk 17 01 01 31 31 Vulnerable contra las Selection factors. Enfermedades Crónicas No Transmisibles (1 consultor) AR-NA-60-CI-3CV / LO- Asistencia técnica para analisis de la estructura, Individual Pending 2017-01- 2017-12- elaboración de diagnóstico y / Post Consultant Limited 62,638.00 0.00 Implementation 01 31 desarrollo de un plan Selection estratégico de ENT (3 consultores) Component 3: Supporting AR-NA-61-CI-3CV / LO- the National and Provincial Especialista para el Desarrollo Ministries of Health to Individual de herramientas para el improve surveillance, 2017-07- 2017-01- 2017-08- 2017-12- 2018-05- IBRD / 85080 Post Consultant Limited 20,880.00 4,118.71 Completed Fortalecimiento de la monitoring, promotion, 24 01 01 31 31 Selection promoción en salud prevention and control of alimentaria (1 consultor) NCDs, injuries, and risk factors. AR-NA-66-CI-3CV / LO- Component 2: Protecting Equipos de Apoyo para el Individual vulnerable population groups 2017-02- 2017-01- 2018-07- 2018-12- 2018-06- Fortalecimiento del Proyecto a IBRD / 85080 Post Consultant Limited 1,076,460.00 33,696.63 Signed against prevalent NCD risk 28 01 01 31 30 nivel provincial y/o municipal Selection factors. (24 consultores) Component 3: Supporting the National and Provincial AR-MSAL-15119-CS-INDV / Ministries of Health to Consultor para el Desarrollo Individual improve surveillance, 2017-08- 2017-05- 2017-05- 2017-06- 2017-10- 2017-12- 2018-04- de investigación cualitativa en IBRD / 85080 Post Consultant Open 10,442.00 2,385.43 Completed 2017-05-15 monitoring, promotion, 29 23 24 01 15 31 15 evaluación de digestos (1) Selection prevention and control of L.O. NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15120-CS-INDV / Ministries of Health to Consultor para revisiones Individual improve surveillance, 2017-10- 2017-05- 2017-05- 2017-06- 2017-11- 2017-12- 2018-04- sistémicas de rotulados y IBRD / 85080 Post Consultant Open 10,442.00 1,316.10 Completed 2017-05-15 monitoring, promotion, 23 23 23 01 01 31 30 nutrientes de alimentos y Selection prevention and control of tabaco (1) L.O. NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15122-CS-INDV / Ministries of Health to Consultor para realizar Individual improve surveillance, 2017-08- 2017-05- 2017-05- 2017-06- 2017-09- 2017-12- 2018-03- estudios de regulación de IBRD / 85080 Post Consultant Open 10,442.00 2,741.90 Completed 2017-05-15 monitoring, promotion, 29 22 22 01 01 31 31 productos alimenticios y Selection prevention and control of tabaco (1) L.O. NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-15127-CS-INDV / the National and Provincial Consultor especialista en Ministries of Health to Individual actividades de Capacitación improve surveillance, 2017-08- 2017-05- 2017-05- 2017-06- 2017-09- 2017-12- IBRD / 85080 Post Consultant Open 10,442.00 3,399.89 Signed 2017-05-15 para Interoperabilidad y monitoring, promotion, 28 22 22 01 01 31 Selection Gestión de la Historia Clínica prevention and control of Electrónica (1) L.O. NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15128-CS-INDV / Ministries of Health to Individual Consultor para el desarrollo improve surveillance, 2017-08- 2017-05- 2017-05- 2017-06- 2017-09- 2017-12- 2018-02- IBRD / 85080 Post Consultant Open 20,883.00 3,235.56 Completed 2017-05-15 del Diccionario de monitoring, promotion, 28 22 22 01 01 31 28 Selection establecimientos (2) L.O. prevention and control of NCDs, injuries, and risk factors. Page 7 Component 3: Supporting AR-MSAL-15129-CS-INDV / the National and Provincial Consultor especialista en Ministries of Health to actividades de Capacitación Individual improve surveillance, 2017-08- 2017-05- 2017-05- 2017-06- 2017-09- 2017-12- 2017-10- para Interoperabilidad y IBRD / 85080 Post Consultant Open 31,325.00 3,783.75 Completed 2017-05-15 monitoring, promotion, 29 22 22 01 01 31 31 Gestión de la Historia Clínica Selection prevention and control of Electrónica para el curso NCDs, injuries, and risk virtual (3) L.O. factors. Component 3: Supporting AR-MSAL-15130-CS-INDV / the National and Provincial Consultor Tutor de Ministries of Health to Individual Capacitación para improve surveillance, 2017-08- 2017-05- 2017-05- 2017-06- 2017-09- 2017-12- 2018-02- IBRD / 85080 Post Consultant Open 31,325.00 4,441.95 Completed 2017-05-15 Interoperabilidad y Gestión de monitoring, promotion, 28 22 22 01 01 31 28 Selection la Historia Clínica Electrónica prevention and control of para el curso virtual (3) L.O. NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-15131-CS-INDV / the National and Provincial Consultor de Apoyo Ministries of Health to Individual Administrativo para la improve surveillance, 2017-09- 2017-05- 2017-05- 2017-06- 2017-09- 2017-12- 2018-03- IBRD / 85080 Post Consultant Open 7,832.00 1,919.31 Completed 2017-05-15 organización de las monitoring, promotion, 07 22 22 01 15 31 15 Selection actividades de capacitación prevention and control of para el curso virtual (1) L.O. NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15133-CS-INDV / Ministries of Health to Especialista en Gestión y Individual improve surveillance, Pending 2017-05- 2017-05- 2017-06- 2017-12- Coordinación de estructuras IBRD / 85080 Post Consultant Open 10,442.00 0.00 2017-05-15 monitoring, promotion, Implementation 22 22 01 31 de apoyo a las Provincias (1) Selection prevention and control of L.O. NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15688-CS-INDV / Ministries of Health to Individual Responsable de la Unidad de improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2018-01- 2020-12- IBRD / 85080 Post Consultant Open 93,903.00 6,862.76 Signed 2017-05-19 Asistencia Administrativa (1) monitoring, promotion, 09 22 22 01 01 31 Selection LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-15689-CS-INDV / Individual improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2018-04- 2020-12- Consultor Administrativo (3) IBRD / 85080 Post Consultant Open 186,449.00 12,097.01 Signed 2017-05-19 monitoring, promotion, 09 22 22 01 01 31 LS Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to Individual AR-MSAL-15691-CS-INDV / improve surveillance, 2017-05- 2017-05- 2017-05- 2017-05- 2018-05- 2020-12- IBRD / 85080 Post Consultant Open 62,150.00 1,316.52 Signed 2017-05-19 Soporte Informático (1) LS monitoring, promotion, 09 19 19 29 01 31 Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15696-CS-INDV / Ministries of Health to Individual Consultor de Gestión de las improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-12- 2020-12- IBRD / 85080 Post Consultant Open 62,150.00 720.94 Terminated 2017-05-19 comunicaciones internas y monitoring, promotion, 09 22 22 01 01 31 Selection externas (1) LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15697-CS-INDV / Ministries of Health to Individual Responsable de la Unidad de improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2018-01- 2020-12- IBRD / 85080 Post Consultant Open 93,903.00 3,431.38 Terminated 2017-05-19 Apoyo Operativo a las monitoring, promotion, 09 22 22 01 01 31 Selection Provincias (1) LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-15698-CS-INDV / Individual improve surveillance, 2016-06- 2017-05- 2017-05- 2017-06- 2018-05- 2020-12- 2018-06- Coordinadores Regionales (5) IBRD / 85080 Post Consultant Open 418,836.00 10,581.22 Signed 2017-05-19 monitoring, promotion, 08 22 22 01 01 31 30 LS Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to Individual AR-MSAL-15699-CS-INDV / improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-09- 2020-12- IBRD / 85080 Post Consultant Open 372,898.00 1,919.31 Signed 2017-05-19 Staff de Apoyo Regional (6) LS monitoring, promotion, 09 22 22 01 15 31 Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-15706-CS-INDV / Individual improve surveillance, 2017-05- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2020-12- Coordinadores Unidad de IBRD / 85080 Post Consultant Open 167,534.00 5,609.23 Terminated 2017-05-19 monitoring, promotion, 09 22 21 22 01 15 31 Monitoreo y Evaluación (2) LS Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15710-CS-INDV / Ministries of Health to Individual Especialista en Planificación improve surveillance, 2016-06- 2017-05- 2017-05- 2017-06- 2018-07- 2020-12- 2018-06- IBRD / 85080 Post Consultant Open 167,534.00 21,112.33 Signed 2017-05-19 operativa y Control de monitoring, promotion, 08 22 22 01 01 31 30 Selection Gestión (2) LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-15712-CS-INDV / Individual improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-09- 2020-12- Analista de Planificación y IBRD / 85080 Post Consultant Open 124,299.00 2,193.50 Signed 2017-05-19 monitoring, promotion, 09 22 22 01 01 31 Seguimiento Operativo (2) LS Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15714-CS-INDV / Ministries of Health to Coordinación del Staff de Individual improve surveillance, 2017-05- 2017-05- 2017-12- 2017-05- 2017-06- 2018-02- 2020-12- Apoyo a la Unidad de IBRD / 85080 Post Consultant Open 83,767.00 5,100.24 Signed 2017-05-19 monitoring, promotion, 09 22 20 22 01 01 31 Relaciones con las Provincias Selection prevention and control of (1) LS NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15722-CS-INDV / Ministries of Health to Individual Técnico de Apoyo al Área de improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-08- 2020-12- IBRD / 85080 Post Consultant Open 83,767.00 3,427.37 Signed 2017-05-19 Reorientación de los Servicios monitoring, promotion, 09 22 22 01 01 31 Selection de Salud (Diabetes) (1) LS prevention and control of NCDs, injuries, and risk factors. Page 8 Component 3: Supporting the National and Provincial AR-MSAL-15729-CS-INDV / Ministries of Health to Técnico de Apoyo al Área de Individual improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-08- 2020-12- Reorientación de los Servicios IBRD / 85080 Post Consultant Open 83,767.00 2,570.53 Signed 2017-05-19 monitoring, promotion, 09 22 22 01 01 31 de Salud (Cardiovascular) (1) Selection prevention and control of LS NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15732-CS-INDV / Ministries of Health to Individual Técnico de Apoyo al Área de improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2020-12- 2018-06- IBRD / 85080 Post Consultant Open 83,767.00 5,949.81 Completed 2017-05-19 Promoción de la salud y monitoring, promotion, 09 22 22 01 01 31 30 Selection Alimentación Saludable (1) LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15737-CS-INDV / Ministries of Health to Individual Técnico de Apoyo al Área de improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-12- 2020-12- IBRD / 85080 Post Consultant Open 83,767.00 822.57 Signed 2017-05-19 promoción de la salud monitoring, promotion, 09 22 22 01 01 31 Selection (Equipo Económico) (1) LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15740-CS-INDV / Ministries of Health to Técnico de Apoyo al Área de Individual improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-08- 2020-12- Vigilancia epidemiológica de IBRD / 85080 Post Consultant Open 124,299.00 5,369.84 Signed 2017-05-19 monitoring, promotion, 09 22 22 01 15 31 enfermedades no Selection prevention and control of transmisibles (2) LS NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15746-CS-INDV / Ministries of Health to Staff Técnico de la Unidad de Individual improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2018-02- 2020-12- interoperabilidad y gestión de IBRD / 85080 Post Consultant Open 124,299.00 5,696.05 Signed 2017-05-19 monitoring, promotion, 09 22 22 01 15 31 la historia clínica electrónica Selection prevention and control of (2) LS NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-16719-CS-INDV / Individual improve surveillance, 2017-05- 2017-06- 2017-06- 2017-06- 2017-08- 2017-12- Staff Técnico de Auditoría (1) IBRD / 85080 Post Consultant Open 83,767.00 3,975.75 Signed 2017-06-01 monitoring, promotion, 09 04 04 14 01 31 LS Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15733-CS-INDV / Ministries of Health to Individual Staff Técnico de Apoyo al improve surveillance, 2016-06- 2017-05- 2016-05- 2017-05- 2017-06- 2017-07- 2020-12- 2018-06- IBRD / 85080 Post Consultant Open 186,449.00 13,284.53 Signed 2017-05-19 Área de Promoción de la monitoring, promotion, 08 22 29 22 01 01 31 30 Selection salud (3) LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15735-CS-INDV / Ministries of Health to Individual Staff Técnico de Apoyo al improve surveillance, 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2020-12- 2018-06- IBRD / 85080 Post Consultant Open 124,299.00 4,126.77 Completed 2017-05-19 Área de Promoción de la monitoring, promotion, 09 22 22 01 01 31 30 Selection Salud (sector legal) (2) LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting AR-NA-39-CI-3CV / the National and Provincial Contratación individual Ministries of Health to Individual posición 'Staff de Apoyo improve surveillance, 2017-05- 2017-05- 2016-05- 2017-08- 2020-12- 2018-06- IBRD / 85080 Post Consultant Limited 350,000.00 20,961.91 Signed 2017-08-29 Técnico a la Unidad de monitoring, promotion, 09 24 01 01 31 30 Selection Relaciones con las Provincias' prevention and control of (6 consultores) NCDs, injuries, and risk factors. Component 3: Supporting AR-NA-37-CI-3CV / the National and Provincial Contratación individual Ministries of Health to Individual posición : Responsable de la improve surveillance, 2018-03- 2017-09- 2017-09- 2017-09- 2018-04- 2020-12- IBRD / 85080 Post Consultant Limited 91,024.00 2,550.12 Signed 2017-09-05 Unidad de interoperabilidad y monitoring, promotion, 06 05 05 05 15 31 Selection gestión de la historia clínica prevention and control of electrónica (1 Consultor) LS NCDs, injuries, and risk factors. AR-MSAL-27901-CS-INDV / Consultor Individual - Component 3: Supporting Investigador del equipo the National and Provincial elaborador de la guía de Ministries of Health to Individual práctica clínica de improve surveillance, 2017-11- 2017-09- 2017-09- 2017-09- 2017-11- 2019-03- IBRD / 85080 Post Consultant Open 19,362.41 884.83 Signed 2017-09-15 Hipertensión arterial y monitoring, promotion, 10 26 27 29 15 31 Selection prevención de las prevention and control of enfermedades NCDs, injuries, and risk cardiovasculares (1 factors. Consultor) LO Component 3: Supporting AR-MSAL-27913-CS-INDV / the National and Provincial Consultor individual - Ministries of Health to Individual Investigador del equipo improve surveillance, 2017-10- 2017-09- 2017-09- 2017-09- 2017-11- 2019-05- IBRD / 85080 Post Consultant Open 21,514.00 913.01 Signed 2017-09-15 elaborador de guías de monitoring, promotion, 09 26 27 29 15 31 Selection alimentarias para la población prevention and control of infantil (1 Consultor) LO NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-27916-CS-INDV / the National and Provincial Consultor individual - Ministries of Health to Investigador para el Individual improve surveillance, 2018-01- 2017-09- 2017-09- 2017-09- 2018-02- 2019-05- desarrollo de contenidos para IBRD / 85080 Post Consultant Open 23,259.00 2,962.18 Signed 2017-09-15 monitoring, promotion, 16 26 27 29 15 31 curso virtual sobre Selection prevention and control of alimentación saludable (1 NCDs, injuries, and risk Consultor) LO factors. Component 3: Supporting AR-MSAL-27918-CS-INDV / the National and Provincial Consultor Individual - Ministries of Health to Individual Especialista en diseño de improve surveillance, 2017-11- 2017-09- 2017-09- 2017-09- 2018-01- 2018-03- 2018-06- IBRD / 85080 Post Consultant Open 6,978.00 3,655.67 Completed 2017-09-15 protocolo para llamadas y monitoring, promotion, 06 26 27 29 01 31 30 Selection respuestas - Cesación prevention and control of Tabáquica (1 Consultor) LO NCDs, injuries, and risk factors. AR-MSAL-27919-CS-INDV / Component 3: Supporting Consultor Individual - the National and Provincial Especialista en análisis y Ministries of Health to desarrollo de software para Individual improve surveillance, 2017-11- 2017-09- 2017-09- 2017-09- 2017-11- 2018-03- 2018-05- estrategias de información y IBRD / 85080 Post Consultant Open 13,956.00 1,913.22 Completed 2017-09-15 monitoring, promotion, 06 26 27 29 15 31 15 comunicación del "SUATS" Selection prevention and control of (Sistema único de atención NCDs, injuries, and risk telefónica en Salud) 2 factors. Consultores - LO AR-NA-31-CI-3CV / Contratación individual Individual 2017-01- 2020-12- posición 'Especialista en / Post Consultant Limited 115,774.00 0.00 Canceled 01 31 salvaguarda indígena' (2 Selection consultores) AR-NA-30-CI-3CV / Contratación individual Individual 2017-01- 2020-12- posición 'Especialista en / Post Consultant Limited 115,774.00 0.00 Canceled 01 31 Salvaguarda Ambiental' (2 Selection consultores) Page 9 AR-NA-41-CI-3CV / Contratación individual Individual 2016-05- 2020-12- posición 'Staff Técnico de / Post Consultant Limited 337,673.00 0.00 Canceled 01 31 Apoyo al Área de Promoción Selection de la Salud' (5 consultores) Component 3: Supporting AR-MSAL-28120-CS-INDV / the National and Provincial Consultor Individual - Ministries of Health to Especialista para la Individual improve surveillance, 2017-12- 2017-10- 2017-10- 2017-11- 2018-01- 2018-11- investigación de campo para IBRD / 85080 Post Consultant Open 21,631.00 2,988.42 Signed 2017-09-28 monitoring, promotion, 26 09 10 15 01 30 el rotulado y nutrientes de Selection prevention and control of alimentos y tabaco(1 NCDs, injuries, and risk Consultor) L.O factors. AR-MSAL-28885-CS-INDV / Component 3: Supporting Contratación individual the National and Provincial posición - Consultor Experto Ministries of Health to para la redacción de un Individual improve surveillance, 2017-11- 2017-10- 2017-10- 2017-11- 2017-11- 2018-04- 2018-05- manual de Buenas Prácticas y IBRD / 85080 Post Consultant Open 7,745.00 1,105.84 Completed 2017-10-01 monitoring, promotion, 13 12 13 01 15 30 15 Procedimientos de gestión Selection prevention and control of para RAEE (Residuos de NCDs, injuries, and risk Aparatos Eléctricos y factors. Electrónicos) 1 consultor L.O AR-MSAL-33613-CS-INDV / Component 3: Supporting Contratación individual the National and Provincial posición : "Asistencia Técnica Ministries of Health to para el Desarrollo de Individual improve surveillance, 2017-11- 2017-10- 2017-10- 2017-11- 2017-11- 2019-10- Herramientas Informáticas IBRD / 85080 Post Consultant Open 75,730.00 1,100.09 Signed 2017-10-24 monitoring, promotion, 06 29 30 01 15 30 para la adopción de Selection prevention and control of estándares de NCDs, injuries, and risk interoperabilidad" (2 factors. consultores) Component 3: Supporting the National and Provincial AR-MSAL-14574-CS-INDV / Ministries of Health to Individual Consultor para el análisis del improve surveillance, 2018-02- 2018-02- 2018-03- 2018-09- IBRD / 85080 Post Consultant Open 8,619.00 0.00 Canceled 2018-02-15 Código Alimentario Argentino monitoring, promotion, 26 27 01 30 Selection (1 posición) L.O. prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15121-CS-INDV / Ministries of Health to Consultor para la Individual improve surveillance, 2018-02- 2018-02- 2018-03- 2018-09- actualización del Estudio de IBRD / 85080 Post Consultant Open 8,619.00 0.00 Canceled 2018-02-15 monitoring, promotion, 24 25 01 30 Carga de Enfermedad de ENT Selection prevention and control of (1) L.O. NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15123-CS-INDV / Ministries of Health to Consultor para elaborar el Individual improve surveillance, 2018-03- 2018-02- 2018-02- 2018-03- 2018-04- 2018-09- 2018-09- protocolo e instrumentos de IBRD / 85080 Post Consultant Open 8,619.00 2,271.26 Completed 2018-02-15 monitoring, promotion, 12 24 25 01 01 30 30 la encuesta de consumo de Selection prevention and control of alimentos (1) L.O. NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-44093-CS-INDV / the National and Provincial Consultoría individual - Ministries of Health to Individual Especialista en Diseño improve surveillance, 2018-03- 2018-02- 2018-02- 2018-03- 2018-04- 2018-08- 2018-09- IBRD / 85080 Post Consultant Open 11,920.00 2,965.71 Completed 2018-02-20 Muestral para la Encuesta monitoring, promotion, 01 26 27 01 01 31 30 Selection Nacional de Nutrición y Salud prevention and control of - ENNYS. (1 Consultor L.O) NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-37233-CS-INDV / the National and Provincial Contratación individual Ministries of Health to posición : Especialista para el Individual improve surveillance, 2018-04- 2018-02- 2018-02- 2018-03- 2018-05- 2019-02- Desarrollo y Fortalecimiento IBRD / 85080 Post Consultant Open 23,840.00 7,622.55 Signed 2018-02-22 monitoring, promotion, 23 26 27 01 15 28 de políticas y programas de Selection prevention and control of Actividades Físicas (1 NCDs, injuries, and risk consultor) - L.O factors. Component 3: Supporting AR-MSAL-46541-CS-INDV / the National and Provincial Consultorio Individual - Ministries of Health to Individual Consultores para el improve surveillance, 2018-03- 2018-03- 2018-04- 2019-04- IBRD / 85080 Post Consultant Open 68,436.00 0.00 Canceled 2018-03-25 Desarrollo de Software para monitoring, promotion, 29 30 01 01 Selection encuestas Poblacionales - L.O prevention and control of (3 Puestos) NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-55403-CS-INDV / Ministries of Health to Individual Consultoria individual : Apoyo improve surveillance, 2018-03- 2018-04- 2018-04- 2018-05- 2018-05- 2020-12- IBRD / 85080 Post Consultant Open 89,730.00 1,136.06 Terminated 2018-04-11 Administrativo de Mesa de monitoring, promotion, 06 22 24 01 01 31 Selection Entrada L.S (2 puestos) prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-55406-CS-INDV / the National and Provincial Consultoria Individual Puesto: Ministries of Health to Staff Técnico de Apoyo al Individual improve surveillance, 2018-03- 2018-04- 2018-05- 2018-04- 2018-05- 2018-06- 2020-12- Área de Servicios de Salud IBRD / 85080 Post Consultant Open 60,445.00 9,075.45 Signed 2018-04-13 monitoring, promotion, 06 24 15 26 01 01 31 (programa de prevención Selection prevention and control of cardiovascular) - L.S (1 NCDs, injuries, and risk Puesto) factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-15690-CS-INDV / Individual improve surveillance, 2016-06- 2018-05- 2018-05- 2018-06- 2018-06- 2020-12- Consultor de Apoyo IBRD / 85080 Post Consultant Open 135,737.00 17,073.75 Signed 2018-05-10 monitoring, promotion, 08 24 27 01 01 31 Administrativo (6) LS Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-NA-42-CI-3CV / Ministries of Health to Contratación individual Individual improve surveillance, 2017-05- 2018-05- 2018-05- 2018-06- 2018-02- 2020-12- posición 'Staff Técnico de IBRD / 85080 Post Consultant Limited 26,019.00 3,046.39 Signed 2018-05-10 monitoring, promotion, 09 24 27 01 01 31 Apoyo al Área de Selection prevention and control of Comunicación' (1 consultor) NCDs, injuries, and risk factors. Component 3: Supporting AR-NA-43-CI-3CV / the National and Provincial Contratación individual Ministries of Health to posición 'Staff Técnico de Individual improve surveillance, 2017-05- 2018-05- 2018-05- 2018-06- 2017-08- 2020-12- Apoyo al Área de Vigilancia IBRD / 85080 Post Consultant Limited 104,077.19 8,588.80 Signed 2018-05-10 monitoring, promotion, 09 24 27 01 15 31 epidemiológica de Selection prevention and control of Enfermedades No NCDs, injuries, and risk Transmisibles (4) LS factors. AR-NA-38-CI-3CV / Component 3: Supporting Contratación individual the National and Provincial posición 'Técnico de apoyo a Ministries of Health to la Unidad de Gestión de Individual improve surveillance, 2016-06- 2018-05- 2018-05- 2018-06- 2018-06- 2020-12- 2018-03- Registros clínicos IBRD / 85080 Post Consultant Limited 280,453.19 20,423.72 Signed 2018-05-10 monitoring, promotion, 08 23 26 01 01 31 31 electrónicos, Historia Clínica Selection prevention and control of Electrónica e NCDs, injuries, and risk Interoperabilidad de sistemas factors. de información" (8) L.S Page 10 AR-MSAL-87670-CS-INDV / Component 3: Supporting Consultoría Individual - the National and Provincial Equipo de Especialistas de Ministries of Health to Individual Planificación y Organización improve surveillance, Pending 2018-12- 2018-12- 2019-01- 2020-12- IBRD / 85080 Post Consultant Open 75,407.00 0.00 2018-12-13 de Estrategias para el monitoring, promotion, Implementation 26 27 01 31 Selection fortalecimiento del Proyecto a prevention and control of Nivel Provincial (Locación de NCDs, injuries, and risk Obra) (4). factors. AR-MSAL-87674-CS-INDV / Component 3: Supporting Consultoría Individual - the National and Provincial Equipo de Especialistas de Ministries of Health to Individual Actividades de promoción de improve surveillance, Pending 2018-12- 2018-12- 2019-01- 2020-12- IBRD / 85080 Post Consultant Open 235,697.00 0.00 2018-12-14 la Salud para el monitoring, promotion, Implementation 26 28 01 31 Selection Fortalecimiento del Proyecto prevention and control of (Locación de Obra) (10 NCDs, injuries, and risk Consultores) factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-109088-CS-INDV Individual improve surveillance, 2018-03- 2019-04- 2019-04- 2019-04- 2018-06- 2021-01- 2019-12- / Coordinadores Unidad de IBRD / 85080 Post Consultant Open 25,483.00 6,524.78 Completed 2019-04-11 monitoring, promotion, 06 14 15 17 01 07 31 Monitoreo y Evaluación (1) LS Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-114294-CS-INDV Ministries of Health to / Técnico de Apoyo al Área de Individual improve surveillance, 2018-03- 2019-09- 2017-05- 2019-09- 2018-12- 2019-09- 2019-02- 2020-12- Promoción de la Salud y IBRD / 85080 Post Consultant Open 58,265.00 9,637.37 Signed 2019-09-01 monitoring, promotion, 06 08 24 09 26 11 01 31 Alimentación Saludable (1) - Selection prevention and control of L.S NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-127081-CS-INDV Ministries of Health to Individual / Consultor de apoyo improve surveillance, 2018-03- 2019-08- 2018-05- 2019-08- 2019-08- 2019-09- 2019-09- 2020-12- IBRD / 85080 Post Consultant Open 15,005.00 2,802.01 Signed 2019-08-28 administrativo ( Cantidad 1) - monitoring, promotion, 06 30 15 30 14 01 01 31 Selection L.S prevention and control of NCDs, injuries, and risk factors. AR-MSAL-85680-CS-INDV / Component 2: Protecting Individual Consultoría Individual vulnerable population groups Pending 2019-12- 2019-12- 2019-12- 2021-12- IBRD / 85080 Post Consultant Limited 36,631.00 0.00 2019-12-09 "Coordinador General" (1 against prevalent NCD risk Implementation 10 11 15 31 Selection consultor) factors. Component 3: Supporting the National and Provincial AR-MSAL-148628-CS-INDV Ministries of Health to / Soporte Operativo de la Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Coordinación General - IBRD / 85080 Post Consultant Open 29,308.00 0.00 2019-12-15 monitoring, promotion, Implementation 18 19 01 31 Cantidad 1 - Locación de Selection prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148637-CS-INDV Ministries of Health to / Consultor de Apoyo a la Individual improve surveillance, Under 2019-11- 2019-12- 2019-12- 2020-01- 2021-12- coordinación General - IBRD / 85080 Post Consultant Direct 21,091.00 0.00 2019-12-16 monitoring, promotion, Implementation 22 22 26 01 31 Cantidad 1 consultor - Selection prevention and control of Locación de Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148643-CS-INDV Ministries of Health to / Coordinador del Área de Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Apoyo a las Provincias - IBRD / 85080 Post Consultant Open 29,308.00 0.00 2019-12-16 monitoring, promotion, Implementation 19 20 01 31 Cantidad 1 consultor - Selection prevention and control of Locación de Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148646-CS-INDV Ministries of Health to Individual / Referentes Regionales - improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 130,355.00 0.00 2019-12-16 Cantidad 5 consultores - monitoring, promotion, Implementation 19 20 01 31 Selection Locación de Servicios prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148647-CS-INDV Ministries of Health to Individual / Staff de Apoyo Regional - improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 210,911.00 0.00 2019-12-16 Cantidad 10 consultores - monitoring, promotion, Implementation 19 20 01 31 Selection Locación de Servicios prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-15700-CS-INDV / Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Consultor Apoyo General (1) IBRD / 85080 Post Consultant Open 18,089.00 0.00 2019-12-16 monitoring, promotion, Implementation 17 17 01 31 LS Selection prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-148790-CS-INDV the National and Provincial / Coordinador de Ministries of Health to Individual Planificación Operativa y improve surveillance, 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 29,308.00 2,084.00 Signed 2019-12-16 Monitoreo - Cantidad 1 monitoring, promotion, 22 19 16 24 21 01 01 31 Selection consultor - Locación de prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15708-CS-INDV / Ministries of Health to Analistas de Informes e Individual improve surveillance, Under 2019-06- 2019-12- 2019-12- 2020-01- 2021-12- Indicadores - Cantidad 4 IBRD / 85080 Post Consultant Open 84,364.34 0.00 2019-12-16 monitoring, promotion, Implementation 08 23 28 01 31 consultores - Locación de Selection prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148798-CS-INDV Ministries of Health to Individual / Apoyo Técnico - Cantidad 1 improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 18,088.53 0.00 2019-12-16 consultor - Locación de monitoring, promotion, Implementation 19 23 01 31 Selection Servicios prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148800-CS-INDV Ministries of Health to / Coordinador del Área de Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Administración - Cantidad 1 IBRD / 85080 Post Consultant Open 29,307.82 0.00 2019-12-16 monitoring, promotion, Implementation 19 22 01 31 Consultor - Locación de Selection prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-148803-CS-INDV the National and Provincial / Consultor de Ministries of Health to Individual Contrataciones y improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 42,182.17 0.00 2019-12-16 Adquisiciones - Cantidad 2 monitoring, promotion, Implementation 21 25 01 31 Selection consultores - Locación de prevention and control of Servicios NCDs, injuries, and risk factors. Page 11 Component 3: Supporting the National and Provincial AR-MSAL-148806-CS-INDV Ministries of Health to Individual / Responsable de Finanzas - improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 26,070.92 0.00 2019-12-16 Cantidad 1 Consultor - monitoring, promotion, Implementation 25 27 01 31 Selection Locación de Servicios prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148810-CS-INDV Ministries of Health to / Consultor de Planificación Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Presupuestaria - Cantidad 1 IBRD / 85080 Post Consultant Open 21,091.08 0.00 2019-12-16 monitoring, promotion, Implementation 20 26 01 31 consultor - Locación de Selection prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148817-CS-INDV Ministries of Health to / Consultor de Cuentas a Individual improve surveillance, Under 2019-11- 2019-12- 2019-12- 2020-01- 2021-12- Pagar - Cantidad 2 IBRD / 85080 Post Consultant Direct 42,182.17 0.00 2019-12-16 monitoring, promotion, Implementation 22 18 20 01 31 consultores - Locación de Selection prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148819-CS-INDV Ministries of Health to / Asistente Técnico de Individual improve surveillance, Under 2019-11- 2019-12- 2019-12- 2020-01- 2021-12- Cuentas a Pagar - Cantidad 1 IBRD / 85080 Post Consultant Direct 18,088.53 0.00 2019-12-16 monitoring, promotion, Implementation 22 18 19 01 31 Consultor - Locación de Selection prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-55397-CS-INDV / Ministries of Health to Coordinadores Unidad de Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Asistencia Administrativa - IBRD / 85080 Post Consultant Open 26,070.92 0.00 2019-12-16 monitoring, promotion, Implementation 25 26 01 31 Cantidad 1 consultor - Selection prevention and control of Locación de Servicios NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-148827-CS-INDV the National and Provincial / Asistente Técnico de Ministries of Health to Individual Producción de Contenidos e improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 18,088.53 0.00 2019-12-16 Información - Cantidad 1 monitoring, promotion, Implementation 22 29 01 31 Selection consultor - Locación de prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-148831-CS-INDV the National and Provincial / Coordinador del Área de Ministries of Health to Individual Gestión Clínica y calidad de improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 29,307.82 0.00 2019-12-16 atención - Cantidad 1 monitoring, promotion, Implementation 22 24 01 31 Selection Consultor - Locación de prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148837-CS-INDV Ministries of Health to / Staff Técnico del equipo de Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- facilitadores provinciales - IBRD / 85080 Post Consultant Open 234,638.00 0.00 2019-12-16 monitoring, promotion, Implementation 23 29 01 31 Cantidad 9 Consultores - Selection prevention and control of Locación de Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148853-CS-INDV Ministries of Health to / Consultor Especialista en Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Salud Familiar y Comunitaria IBRD / 85080 Post Consultant Open 78,212.77 0.00 2019-12-16 monitoring, promotion, Implementation 22 26 01 31 - Cantidad 3 consultores - Selection prevention and control of Locación de Servicios NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-148854-CS-INDV the National and Provincial / Staff de Apoyo Técnico a la Ministries of Health to Individual Unidad de Relaciones con las improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 19,230.98 0.00 2019-12-16 Provincias - Cantidad de monitoring, promotion, Implementation 21 23 01 31 Selection vacantes 1 - Locación de prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-148862-CS-INDV Ministries of Health to / Staff Técnico de Apoyo al Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Área de Promoción de la IBRD / 85080 Post Consultant Open 19,231.00 0.00 2019-12-16 monitoring, promotion, Implementation 22 26 01 31 Salud - Cantidad 1 consultor Selection prevention and control of - Locacion de Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-15734-CS-INDV / Ministries of Health to Individual Técnico de Apoyo al Área de improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 26,071.00 0.00 2019-12-17 Promoción de la salud (sector monitoring, promotion, Implementation 22 26 01 31 Selection legal) (1) LS prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-148863-CS-INDV the National and Provincial / Staff Técnico de Apoyo al Ministries of Health to Individual Área de Promoción de la improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- IBRD / 85080 Post Consultant Open 38,462.00 0.00 2019-12-16 Salud (Sector Legal) - monitoring, promotion, Implementation 27 29 01 31 Selection Cantidad 2 consultores - prevention and control of locación de servicios NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-148864-CS-INDV the National and Provincial / Técnico de apoyo a la Ministries of Health to Dirección Nacional de Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Sistemas de Información en IBRD / 85080 Post Consultant Open 130,355.00 0.00 2019-12-16 monitoring, promotion, Implementation 22 24 01 31 Salud - Cantidad 5 Selection prevention and control of consultores - Locacion de NCDs, injuries, and risk Servicios factors. Component 3: Supporting the National and Provincial AR-MSAL-55427-CS-INDV / Ministries of Health to Consultoría individual puesto: Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Consultor Experto en IBRD / 85080 Post Consultant Open 26,071.00 0.00 2019-12-16 monitoring, promotion, Implementation 27 29 01 31 Asistencia Operativa a Selection prevention and control of Provincias - L.S (1 puesto) NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-55428-CS-INDV / the National and Provincial Consultor de Apoyo Ministries of Health to administrativo a la Dirección Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Nacional de Sistemas de IBRD / 85080 Post Consultant Open 18,089.00 0.00 2019-12-16 monitoring, promotion, Implementation 27 29 01 31 Información en Salud - 1 Selection prevention and control of consultor - Locacion de NCDs, injuries, and risk Servicios factors. Page 12 Component 3: Supporting the National and Provincial AR-MSAL-135802-CS-INDV Ministries of Health to / Staff Técnico de la Dirección Individual improve surveillance, Pending 2019-12- 2019-12- 2020-01- 2021-12- Nacional de Sistemas de IBRD / 85080 Post Consultant Open 21,091.08 0.00 2019-12-16 monitoring, promotion, Implementation 24 25 21 31 Información en Salud - Selection prevention and control of Cantidad consultor -(L.S) NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-160489-CS-INDV Ministries of Health to / Consultor de Gestión Clínica Individual improve surveillance, Pending 2020-02- 2020-02- 2020-03- 2021-12- y calidad de atención, IBRD / 85080 Post Consultant Open 18,194.80 0.00 2020-02-24 monitoring, promotion, Implementation 27 28 01 31 Cantidad 1 consultor - Selection prevention and control of Locación de Servicios NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-160490-CS-INDV the National and Provincial / Asistente Técnico de Ministries of Health to Individual Gestión Clínica y calidad de improve surveillance, Pending 2020-02- 2020-02- 2020-03- 2021-12- IBRD / 85080 Post Consultant Open 15,604.57 0.00 2020-02-24 atención, Cantidad 1 monitoring, promotion, Implementation 27 28 01 31 Selection consultor - Locación de prevention and control of Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-160491-CS-INDV Ministries of Health to / Consultor de Gestión y Individual improve surveillance, Pending 2020-02- 2020-02- 2020-03- 2021-12- Seguimiento de RRHH, IBRD / 85080 Post Consultant Open 18,194.80 0.00 2020-02-24 monitoring, promotion, Implementation 27 28 01 31 Cantidad 1 consultor - Selection prevention and control of Locación de Servicios NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-160493-CS-INDV Ministries of Health to / Asistente Técnico de Individual improve surveillance, Under 2019-11- 2020-02- 2020-02- 2020-03- 2021-12- Gestión y Seguimiento de IBRD / 85080 Post Consultant Open 15,604.57 0.00 2020-02-24 monitoring, promotion, Implementation 22 27 28 01 31 RRHH, Cantidad 1 consultor - Selection prevention and control of Locación de Servicios NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-160898-CS-INDV the National and Provincial / Asistente Técnico para Ministries of Health to Individual Contrataciones y improve surveillance, Pending 2020-02- 2020-02- 2020-03- 2021-12- IBRD / 85080 Post Consultant Open 15,604.57 0.00 2020-02-24 Adquisiciones, Cantidad 1 monitoring, promotion, Implementation 27 28 01 31 Selection consultor - Locación de prevention and control of Servici NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-165595-CS-INDV Ministries of Health to / Responsable de Individual improve surveillance, Pending 2020-03- 2020-03- 2020-04- 2021-12- Contrataciones y IBRD / 85080 Post Consultant Open 20,974.00 0.00 2020-03-23 monitoring, promotion, Implementation 26 28 01 31 Adquisiciones de Bienes y Selection prevention and control of Servicios (L.S - 1 posición) NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-165596-CS-INDV Ministries of Health to Individual / Consultor Legal para el Área improve surveillance, Pending 2020-03- 2020-03- 2020-04- 2021-12- IBRD / 85080 Post Consultant Open 16,967.00 0.00 2020-03-23 Técnico-Jurídica (L.S - 1 monitoring, promotion, Implementation 28 29 01 31 Selection posición) prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-165597-CS-INDV Ministries of Health to / Staff Técnico de la Dirección Individual improve surveillance, Pending 2020-03- 2020-03- 2020-04- 2021-12- Nacional de Sistemas de IBRD / 85080 Post Consultant Open 16,967.00 0.00 2020-03-23 monitoring, promotion, Implementation 29 30 01 31 Información en Salud (L.S - 1 Selection prevention and control of posición) NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-181897-CS-INDV Ministries of Health to / Coordinador de Individual improve surveillance, Pending 2020-07- 2020-07- 2020-08- 2021-12- Planificación Operativa y IBRD / 85080 Post Consultant Open 16,994.62 0.00 2020-07-20 monitoring, promotion, Implementation 26 29 01 31 Monitoreo - Locación de Selection prevention and control of Servicios (1 consultor) NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-187039-CS-INDV Ministries of Health to Individual / Responsable de improve surveillance, Pending 2020-08- 2020-08- 2020-09- 2021-12- IBRD / 85080 Post Consultant Open 35,757.35 0.00 2020-08-15 Planificación Operativa y monitoring, promotion, Implementation 18 19 01 31 Selection Monitoreo - (2 consultores) prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-187754-CS-INDV Ministries of Health to Individual / Staff Técnico del equipo de improve surveillance, Pending 2020-08- 2020-08- 2020-09- 2021-12- IBRD / 85080 Post Consultant Open 40,865.53 0.00 2020-08-20 facilitadores provinciales (3 monitoring, promotion, Implementation 27 28 01 31 Selection consultores) prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-209740-CS-INDV Ministries of Health to Individual / Consultor Legal para el Área improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- IBRD / 85080 Post Consultant Open 9,218.63 0.00 2020-12-21 Técnico-Jurídica - Locación monitoring, promotion, Implementation 25 26 01 31 Selection de Servicios - (1 posición) prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-209763-CS-INDV the National and Provincial / Coordinación del Staff de Ministries of Health to Individual Apoyo a la Unidad de improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- IBRD / 85080 Post Consultant Open 11,395.25 0.00 2020-12-20 Relaciones con las Provincias monitoring, promotion, Implementation 24 25 01 31 Selection - Locacion de Servicios - 1 prevention and control of vacante NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-209776-CS-INDV the National and Provincial / Técnico de Apoyo al Área de Ministries of Health to Individual Reorientación de los Servicios improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- IBRD / 85080 Post Consultant Open 11,395.25 0.00 2020-12-21 de Salud (Diabetes) - monitoring, promotion, Implementation 25 29 01 31 Selection Locacion de Servicios - 1 prevention and control of Posición NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-209781-CS-INDV the National and Provincial / Técnico de Apoyo al Área de Ministries of Health to Individual Reorientación de los Servicios improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- IBRD / 85080 Post Consultant Open 11,395.25 0.00 2020-12-22 de Salud (Cardiovascular) - monitoring, promotion, Implementation 26 27 01 31 Selection "Locacion de Servicios" - 1 prevention and control of posición NCDs, injuries, and risk factors. Page 13 Component 3: Supporting the National and Provincial AR-MSAL-209789-CS-INDV Ministries of Health to / Staff Técnico de Apoyo al Individual improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- Área de Reorientación de los IBRD / 85080 Post Consultant Open 25,216.80 0.00 2020-12-23 monitoring, promotion, Implementation 26 27 01 31 Servicios de Salud - Locación Selection prevention and control of de Servicios - "3 Posiciones" NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-209793-CS-INDV the National and Provincial / Staff Técnico de Apoyo al Ministries of Health to Individual Área de Servicios de Salud improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- IBRD / 85080 Post Consultant Open 11,395.25 0.00 2020-12-21 (programa de prevención monitoring, promotion, Implementation 25 26 01 31 Selection cardiovascular) - Locación de prevention and control of Servicios - 1 posición NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-209802-CS-INDV Ministries of Health to / Staff Técnico de Apoyo al Individual improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- Área de Promoción de la IBRD / 85080 Post Consultant Open 16,811.20 0.00 2020-12-21 monitoring, promotion, Implementation 24 26 01 31 Salud - Locación de Servicios Selection prevention and control of - 2 posiciones NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-209806-CS-INDV Ministries of Health to / Técnico de Apoyo al Área de Individual improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- Vigilancia Epidemiológica de IBRD / 85080 Post Consultant Open 22,790.51 0.00 2020-12-23 monitoring, promotion, Implementation 27 29 01 31 ENT - Locación de Servicios - Selection prevention and control of 2 Posiciones NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-209807-CS-INDV the National and Provincial / Staff Técnico de Apoyo al Ministries of Health to Individual Área de Vigilancia improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- IBRD / 85080 Post Consultant Open 36,874.53 0.00 2020-12-21 Epidemiológica de ENT - monitoring, promotion, Implementation 27 29 01 31 Selection Locación de Servicios - 4 prevention and control of posiciones NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-209811-CS-INDV Ministries of Health to / Responsable de Sistemas de Individual improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- Información en Salud - IBRD / 85080 Post Consultant Open 11,395.25 0.00 2020-12-21 monitoring, promotion, Implementation 27 28 01 31 Locación de Servicios - 1 Selection prevention and control of posición NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-209812-CS-INDV the National and Provincial / Técnico de apoyo a la Ministries of Health to Individual Dirección Nacional de improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- IBRD / 85080 Post Consultant Open 34,185.76 0.00 2020-12-21 Sistemas de Información en monitoring, promotion, Implementation 28 29 01 31 Selection Salud - Locación de Servicios prevention and control of - 3 Posiciones NCDs, injuries, and risk factors. Component 3: Supporting AR-MSAL-209816-CS-INDV the National and Provincial / Técnico de Apoyo al Área de Ministries of Health to Individual Promoción de la Salud improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- IBRD / 85080 Post Consultant Open 11,395.25 0.00 2020-12-21 (Equipo Económico) - monitoring, promotion, Implementation 26 28 01 31 Selection Locación de Servicios - 1 prevention and control of posición NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-209817-CS-INDV Ministries of Health to / Staff Técnico del equipo de Individual improve surveillance, Pending 2020-12- 2020-12- 2021-01- 2021-12- facilitadores provinciales - IBRD / 85080 Post Consultant Open 45,581.02 0.00 2020-12-22 monitoring, promotion, Implementation 29 30 01 31 Locación de Servicios - 4 Selection prevention and control of posiciones NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial Ministries of Health to AR-MSAL-147033-CS-CDS / improve surveillance, 2019-12- 2019-12- 2020-03- 2020-02- 2022-01- Auditoría a Provincias 2019- IBRD / 85080 Post Direct Selection Direct 500,000.00 0.00 Canceled 2019-12-05 monitoring, promotion, 22 16 13 11 31 2022 prevention and control of NCDs, injuries, and risk factors. Component 3: Supporting the National and Provincial AR-MSAL-238949-CS-INDV Ministries of Health to / Staff Técnico de Apoyo al Individual improve surveillance, Pending 2021-06- 2021-06- 2021-07- 2021-12- Área de Servicios de Salud IBRD / 85080 Post Consultant Open 5,883.00 0.00 2021-06-13 monitoring, promotion, Implementation 24 26 01 31 (programa de prevención Selection prevention and control of cardiovascular) NCDs, injuries, and risk factors. Page 14 SUMMARY O F PROCUREMENT PLAN Project Preparation Advancement Project information: Liberia Integrated Public Financial Management Reform Project II P165000 Project Implementation agency: Ministry of Finance and Development Planning Date of the Procurement Plan: April 24, 2018 Period covered by this Procurement Plan: July 1, 2017- December 31, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 1, 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the IPFMRP II): Thresholds*, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] All contracts at or above USD Open Competition 5,000,000 are subject to International Market international advertising and C ≥ 5,000,000 Approach and Direct the use of the Bank’s SPDs (or Contracting other documents agreed with the Bank). 1 Works Open Competition National Market 200,000 < C < 5,000,000 None Approach C ≤ 200,000 RfQ None All contracts at or above USD Open Competition 500,000 are subject to International Market international advertising and C ≥ 500,000 Approach and Direct the use of the Bank’s SPDs (or Goods, IT and Contracting other documents agreed with 2 non-consulting the Bank). services Open Competition 100,000 < C < 500,000 National Market None Approach C ≤ 100,000 RfQ None All contracts at or above USD 100,000 are subject to for international advertising and C < 100,000 Consulting Services the use of the Bank’s SPDs (or National other documents agreed with shortlist for the Bank). 3 selection of All contracts at or above USD consultant firms for 200,000 are subject to Engineering and international advertising and C ≤ 200,000 Construction the use of the Bank’s SPDs (or Supervision other documents agreed with the Bank). Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Selection of All values ≥ 100,000 4 Individual All Approaches consultants Training, Based on approved Workshops, This line activity is not subject 5 All Values Annual Work Plan & Study Tours to Procurement Review. Budgets (AWPB) by TTL (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will need for prequalification in the procurement arrangements under IPFMRP II *These thresholds are for the purposes of the initial procurement plan for the PPA and for first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The IPFMRP II Program team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Works There are no works under the Project Preparation Advance Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimat Selection Review Expecte Expecte Expecte Comme No. Assignment ed Method/ by Bank d date d d nts Cost in Arrangem (Prior / of Contrac Completi US$ ent Post) proposa t on l Signatu Date submiss re ion Date 1. SLA for Wimax 99,000.0 RFQ Post N/A 21 Sep 31 Aug 18 Complet 0 17 e 2. SLA for Battery 52,998.0 DS Post N/A 27 Jul 17 31 Jul 18 Complet Bank 0 e 3. SLA for Data Center 52,998.0 RFQ Post N/A 27 Jul 17 20 Jul 18 Complet 0 e 4. Firm to configure 750,000. RFB (IMA) Prior 10 Jul 17 21 Nov 20 May and roll out SIGTAS 00 17 18 to revenue collection point 5. Procurement of 551,860. RFB (NMA) Post N/A 22 Jan 18 15 Jun 18 Evaluatio hardware, data 00 n Report storage, network & under communication review devices, and licenses, etc. to secure stability of SIGTAS 6. Procurement of a 28,000.0 RFQ Post N/A 5 Mar 18 30 Apr 18 Complet Vehicle for LRA to 0 e facilitate Regional Dialogue on DRM Consultancy Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimate Selection Review Expecte Expecte Expected Comments No. Assignment d Method/ by Bank d date d Completi Cost in Arrangem (Prior / of Contrac on US$ ent Post) proposa t Date l submiss Signatu ion re Date 1. PSM for various 143,954.0 DS Post 05 Jul 17 28 Jul 17 30 Jun 18 Received IDA FreeBalance 0 No objection Application for Direct Modules Selection 2. TA (ITAS Advisor) 271,014.0 IC Post 15 Jan 18 21 Feb 30 Jun 18 ToR submitted; to provide support 0 18 Received IDA for system No Objection. stability Complete 3. TA to cost and 45,000.00 IC Post 6 Dec 17 15 Jan 18 21 Mar 18 ToR submitted; validate the Received IDA Domestic No Objection. Resource Complete. Mobilization Strategy 4. TA (Senior DBA) 132,000.0 IC Post 6 Dec 17 15 Jan 18 30 Jun 18 ToR submitted; to provide support 0 Received IDA to SIGTAS No Objection. stability Complete 5. TA (Local ITAS 72,000.00 IC Post 6 Dec 17 15 Jan 18 30 Jun 18 ToR submitted; Advisor) to Received IDA provide support No Objection. for the stability of Complete the current SIGTAS System 6. TA to conduct 150,000.0 CQS Post 6 Dec 17 30 Jan 18 26 Mar 18 ToR to be Business Process 0 submitted to Reengineering of IDA for Review the ITAS for LRA and No Objection. 7. TA to develop 25,000.00 IC Post 20 Jul 17 29 Sep 28 Mar 18 ToR to be Open Budget 17 submitted to national action IDA for Review plan and No Objection. 8. TA to undertake 190,000.0 CQS Post 12 Jul 17 21 Sep 20 Mar 18 ToR submitted; PFM/Procurement 0 17 Received IDA Capacity Needs No Objection. Assessment and Complete. develop Capacity building strategy 9. TA to develop the 50,000.00 CQS Post 03 Jul 17 13 Sep 12 Nov 17 ToR to be M&E Results 17 submitted to Framework for the IDA for Review PFM Strategy and No Objection. 10. International DS Prior 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Procurement Received IDA Specialist No Objection. 199,800.00 Complete 11. Data Center DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Manager Received IDA No Objection. 90,000.00 Complete 12. M & E Officer DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Received IDA No Objection. 45,000.00 Complete 13. Change DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Management Received IDA Officer No Objection. 45,000.00 Complete 14. Administration DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Officer Received IDA No Objection. 36,000.00 Complete 15. Data Base DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Administrator 1 Received IDA No Objection. 72,000.00 Complete 16. Data Base DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Administrator 2 Received IDA No Objection. 72,000.00 Complete 17. Economic DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Consultant 54,000.00 Received IDA No Objection. Complete 18. Administrative DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted, Assistant Received IDA No Objection. 12,600.00 Complete 19. NSA Coordinator DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Received IDA No objection. 54,000.00 Complete 20. Grant Finance DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Officer received IDA No Objection. 27,000.00 Complete 21. Senior Assistant DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Internal Auditor received IDA No Objection. 45,000.00 Complete 22. Assistant Internal DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Auditor received IDA No Objection. 36,000.00 Complete 23. Senior Assistant DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Project Account received IDA No Objection. 36,000.00 Complete 24. Sylvia A. Squire DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; received IDA No Objection. 47,817.00 Complete 25. Kehleboe Gongloe DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; received IDA No Objection. 93,600.00 Complete 26. Jenkins T. Taylor DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; received IDA No Objection. 77,400.00 Complete 27. Gariston W. Bailey DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; received IDA No Objection. 75,600.00 Complete Training and Workshop (Training & Workshop activities are subject to TTL clearance). Estima Estimated Expected Ref. Training, workshop and ted Duration Training/workshop No. study tours Cost in (Days) Date (US$) National Revenue Summit 10,000. 1. 00 28 9 Apr 18 Validation of national open 25,000. 2. budget national action plan 00 20 16 Apr 18 Validate PFM/Procurement 10,000. 3. Needs Assessment and 00 10 02 Apr 18 Capacity Building Strategy GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) the salaries of locally contracted support staff of the Project entities and units involved in Project implementation (excluding civil servants) and state contributions thereon; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance and insurance; (iv) communication technology (including, without limitation, internet and telephone) and maintenance of equipment; (v) rental expenses and utilities; (vi) building security and maintenance; (vii) translations services, photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: PROCUREMENT Liberia : Public Financial Management Reforms for Institutional Strengthening PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2019-01-15 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165000 GPN Date: 2019-11-01 Project Name: Public Financial Management Reforms for Institutional Strengthening Loan / Credit No: IDA / V1080, IDA / D5060 M Executing Agency(ies): inistry of Finance and Development Planning WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MFDP-97556-GO-RFB / 1: Enhancing DRM Sources Single Stage - One Procurement of Hardware IDA / V1080 Post Request for Bids Open - National 551,860.00 0.00 Canceled 2018-01-22 2018-01-27 2018-03-10 2018-04-09 2018-05-14 2018-07-31 and Systems Envelope Data Storage and Network Devices LR-MFDP-97544-GO-RFQ / 1: Enhancing DRM Sources Request for Single Stage - One Procurement of Laptops for IDA / V1080 Post Limited 8,635.00 8,430.00 Completed 2018-08-25 2018-08-27 2018-10-20 2018-09-14 2018-10-30 2018-10-24 and Systems Quotations Envelope LRA LR-MFDP-97550-GO-RFQ / 1: Enhancing DRM Sources Request for Single Stage - One Procurement of Vehicle for IDA / V1080 Post Limited 28,000.00 28,000.00 Completed 2018-02-12 2018-02-07 2018-04-09 2018-05-21 2018-06-04 2018-06-04 and Systems Quotations Envelope LRA LR-MFDP-145523-GO-RFQ / Procurement of 10 doors, 200 3: Improving Public-Sector Under chairs, 2 overhead projectors, Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 100,000.00 0.00 Implementati 2019-12-21 2020-08-03 2020-02-15 2020-08-13 1 speaker stand and 10 air Quotations Envelope Oversight and Accountability on conditions for UL Resource Center PFMRISP-REF-11 / Request for Single Stage - One Procurement of 4 office chairs IDA / D5060 5: Project Management Post Limited 30,000.00 0.00 Canceled 2020-01-25 2020-03-21 2020-06-19 Quotations Envelope and 3 desks for PMU LR-MFDP-151032-GO-RFB / Procurement of Desktops, 1: Enhancing DRM Sources Single Stage - One IDA / D5060 Post Request for Bids Open - National 300,000.00 0.00 Canceled 2020-01-06 2020-01-06 2020-01-11 2020-01-06 2020-02-22 2020-02-10 2020-03-23 2020-04-27 2020-10-24 Laptops and Other Office and Systems Envelope Equipment LR-MFDP-151054-GO-RFQ / Procurement of 4 chairs and 3 Request for Single Stage - One IDA / D5060 5: Project Management Post Limited 5,000.00 3,165.00 Completed 2020-01-17 2020-02-07 2020-03-13 2020-02-10 2020-09-09 2020-02-28 desks for Project Management Quotations Envelope Unit LR-MFDP-145295-GO-RFQ / 3: Improving Public-Sector Request for Single Stage - One Procurement and Installation IDA / D5060 Capacity for Enhanced Post Limited 70,000.00 0.00 Canceled 2019-12-25 2020-02-19 2020-08-17 Quotations Envelope of CAAT software for IAA Oversight and Accountability 3: Improving Public-Sector LR-MFDP-152772-GO-RFQ / Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 150,000.00 72,500.00 Completed 2020-01-20 2020-01-07 2020-03-16 2020-02-07 2020-09-12 2020-06-11 Procurement of 4 vehicles Quotations Envelope Oversight and Accountability LR-MFDP-163495-GO-RFQ / 4: Improving Upstream and Request for Single Stage - One Procurement of 3 vehicles for IDA / D5060 Downstream PFM Systems in Post Limited 135,000.00 89,500.00 Signed 2020-03-23 2020-03-18 2020-05-18 2020-05-05 2020-11-14 Quotations Envelope RCU, PMU and DMA Selected Sectors LR-MFDP-164547-GO-RFB / 2: Stabilizing and Procurement of Desktops, Strengthening Performance of Single Stage - One IDA / D5060 Post Request for Bids Open - National 450,000.00 0.00 Canceled 2020-03-24 2020-03-29 2020-05-10 2020-06-09 2020-07-14 2021-01-10 Laptops and Other Office Financial Controls and Envelope Equipment Systems LR-MFDP-170135-GO-RFB / Procurement of Desktops, 1: Enhancing DRM Sources Single Stage - One IDA / D5060 Post Request for Bids Open - National 450,000.00 291,956.00 Signed 2020-01-06 2020-01-06 2020-01-11 2020-02-22 2020-02-10 2020-03-23 2020-05-12 2020-04-27 2020-07-28 2020-10-24 Laptops, Printers and Other and Systems Envelope ICT Equipment 2: Stabilizing and LR-MFDP-150793-GO-RFQ / Strengthening Performance of Request for Single Stage - One Refurbishment of the IFMIS IDA / D5060 Post Limited 50,000.00 0.00 Canceled 2020-01-04 2020-02-29 2020-08-27 Financial Controls and Quotations Envelope Training Room Systems LR-MFDP-196967-GO-RFQ / 2: Stabilizing and Procurement of Scanners and Pending Strengthening Performance of Request for Single Stage - One printers for rollout of IDA / D5060 Post Limited 15,000.00 0.00 Implementati 2020-12-20 2021-02-14 2021-08-13 Financial Controls and Quotations Envelope Electronic Data Management on Systems System LR-MFDP-197169-GO-RFQ / 3: Improving Public-Sector Procurement of 1 laptop, Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 3,000.00 2,930.00 Completed 2020-11-15 2020-11-19 2021-01-10 2020-11-24 2021-07-09 2020-12-02 desks, printer, projector and Quotations Envelope Oversight and Accountability camera for NSA LR-MFDP-196983-GO-RFQ / Procurement of 10 air 3: Improving Public-Sector Pending Request for Single Stage - One conditioners, projectors and IDA / D5060 Capacity for Enhanced Post Limited 20,000.00 0.00 Implementati 2020-11-15 2021-01-10 2021-07-09 Quotations Envelope electronic equpiment for the Oversight and Accountability on University of Liberia LR-MFDP-196956-GO-RFQ / 3: Improving Public-Sector Pending Procurement of resource Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Open - International 100,000.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 materials (text books) for the Quotations Envelope Oversight and Accountability on University of Liberia Page 1 LR-MFDP-196925-GO-RFQ / Pending Procurement of 5 laptops, 3 Request for Single Stage - One IDA / D5060 5: Project Management Post Limited 20,000.00 0.00 Implementati 2020-09-07 2020-11-02 2021-05-01 desks and 1 printer & Quotations Envelope on catridges for PMU LR-MFDP-197180-GO-RFQ / Procurement of one vehicle Request for Single Stage - One IDA / D5060 5: Project Management Post Limited 60,000.00 54,461.00 Signed 2020-11-21 2020-10-06 2021-01-16 2020-12-15 2021-07-15 for Office of the Minister of Quotations Envelope Finance 2: Stabilizing and LR-MFDP-200528-GO-RFQ / Pending Strengthening Performance of Request for Single Stage - One Refurbishment of the IFMIS IDA / D5060 Post Limited 75,000.00 0.00 Implementati 2020-12-18 2021-02-12 2021-08-11 Financial Controls and Quotations Envelope Training Room at MFDP on Systems 2: Stabilizing and LR-MFDP-203883-GO-RFQ / Strengthening Performance of Request for Single Stage - One Procurement of Hardware for IDA / D5060 Post Limited 85,000.00 72,473.00 Completed 2021-01-11 2020-11-23 2021-03-08 2020-12-15 2021-09-04 2021-01-07 Financial Controls and Quotations Envelope EFT Implementation Systems LR-MFDP-203882-GO-RFQ / 3: Improving Public-Sector Refurbishment of the Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 30,000.00 27,501.64 Signed 2021-01-13 2020-12-01 2021-03-10 2021-02-10 2021-09-06 University of Liberia Resource Quotations Envelope Oversight and Accountability Center LR-MFDP-197168-GO-RFQ / Procurement of office Request for Single Stage - One IDA / D5060 5: Project Management Post Limited 25,000.00 0.00 Canceled 2021-03-29 2021-05-24 2021-11-20 furniture (desks and chairs) Quotations Envelope for PMU LR-MFDP-196969-GO-RFQ / 2: Stabilizing and Procurement of incident Strengthening Performance of Request for Single Stage - One IDA / D5060 Post Limited 50,000.00 0.00 Canceled 2021-02-15 2021-04-12 2021-10-09 management software (help Financial Controls and Quotations Envelope desk) Systems LR-MFDP-225491-GO-RFQ / 3: Improving Public-Sector Pending Procurement of Servers and Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 35,000.00 0.00 Implementati 2021-01-27 2021-03-24 2021-09-20 Software for Pentana Quotations Envelope Oversight and Accountability on Implementation LR-MFDP-145528-GO-DIR / 4: Improving Upstream and Procurement of STATA for IDA / D5060 Downstream PFM Systems in Post Direct Selection Direct 5,400.00 0.00 Canceled 2020-01-16 2020-01-21 2020-02-25 2020-08-23 PETS Selected Sectors LR-MFDP-145144-GO-RFQ / 4: Improving Upstream and Procurement of 2 Windows Request for Single Stage - One IDA / D5060 Downstream PFM Systems in Post Open - National 67,500.00 0.00 Canceled 2019-12-15 2020-02-09 2020-08-07 Servers and backup, and Quotations Envelope Selected Sectors operating systems licenses LR-MFDP-197187-GO-RFB / 2: Stabilizing and Procurement of 90 desktops, Strengthening Performance of Single Stage - One IDA / D5060 Post Request for Bids Open - National 150,000.00 0.00 Canceled 2021-01-08 2021-01-13 2021-02-24 2021-03-26 2021-04-30 2021-10-27 and 90 printers for IFMIS Financial Controls and Envelope rollout to 20 sites Systems LR-MFDP-235374-GO-RFQ / Pending Procurement of 10 laptops, 2 1: Enhancing DRM Sources Request for Single Stage - One IDA / D5060 Post Limited 20,000.00 0.00 Implementati 2021-06-15 2021-08-10 2021-11-08 printers and 1 projector with and Systems Quotations Envelope on screen LR-MFDP-235389-GO-RFQ / Pending 1: Enhancing DRM Sources Request for Single Stage - One Procurement of office IDA / D5060 Post Limited 100,000.00 0.00 Implementati 2021-06-15 2021-08-10 2021-11-08 and Systems Quotations Envelope furniture and fixture on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 2: Stabilizing and LR-MFDP-97553-NC-RFQ / Strengthening Performance of Request for Single Stage - One IDA / V1080 Post Limited 99,000.00 99,500.00 Completed 2018-01-09 2018-01-04 2018-03-06 2018-02-28 2019-02-28 2019-02-28 SLA for Wimax Financial Controls and Quotations Envelope Systems 2: Stabilizing and LR-MFDP-97594-NC-DIR / Strengthening Performance of IDA / V1080 Post Direct Selection Direct 52,998.00 28,800.00 Completed 2017-12-15 2017-12-15 2017-12-20 2017-12-18 2018-01-24 2017-12-28 2018-12-26 2018-12-26 SLA for Battery Bank Financial Controls and Systems 2: Stabilizing and LR-MFDP-97441-NC-RFQ / Strengthening Performance of Request for Single Stage - One SLA for Data Center IDA / V1080 Post Limited 52,998.00 98,658.67 Completed 2018-04-01 2018-03-08 2018-05-27 2018-07-30 2019-02-28 2019-01-31 Financial Controls and Quotations Envelope Maintenance Systems 2: Stabilizing and LR-MFDP-135160-NC-DIR / Strengthening Performance of SLA for IFMIS Infrastructure IDA / D5060 Post Direct Selection Direct 100,000.00 0.00 Canceled 2019-09-20 2019-06-17 2019-09-25 2019-09-04 2019-10-30 2020-09-30 Financial Controls and Support and Maintenance Systems 2: Stabilizing and LR-MFDP-135377-NC-DIR / Strengthening Performance of Redeployment of Electronic IDA / V1080 Post Direct Selection Direct 98,000.00 0.00 Canceled 2019-07-13 2019-07-15 2019-07-18 2019-08-16 2019-08-22 2019-12-16 Financial Controls and Data Management System Systems 2: Stabilizing and LR-MFDP-135395-NC-DIR / Strengthening Performance of IDA / V1080 Prior Direct Selection Direct 352,406.00 0.00 Canceled 2019-06-27 2019-10-14 2019-07-02 2019-10-14 2019-08-06 2019-10-31 Activation of Budget Module Financial Controls and Systems LR-MFDP-145529-NC-DIR / 2: Stabilizing and Pending Activation of key Strengthening Performance of IDA / D5060 Post Direct Selection Direct 250,000.00 0.00 Implementati 2019-12-12 2019-12-17 2020-01-21 2020-07-19 functionalities by FreeBalance Financial Controls and on for IFMIS improvement Systems LR-MFDP-145292-NC-DIR / 2: Stabilizing and SLA for IFMIS Infrastructure Strengthening Performance of IDA / D5060 Post Direct Selection Direct 86,000.00 86,000.00 Signed 2019-10-02 2019-10-02 2019-10-07 2019-10-04 2019-11-11 2019-10-15 2020-11-10 Support and Maintenance Financial Controls and Services Systems Page 2 LR-MFDP-151076-NC-DIR / 2: Stabilizing and Enhancement of the Electronic Strengthening Performance of IDA / D5060 Post Direct Selection Direct 98,000.00 98,000.00 Completed 2019-07-15 2019-07-15 2019-07-20 2019-08-15 2019-08-24 2019-09-13 2020-02-20 2020-05-29 Document Management Financial Controls and System Systems LR-MFDP-145269-NC-RFB / 2: Stabilizing and Implement the EFT system Strengthening Performance of Single Stage - One IDA / D5060 Post Request for Bids Open - International 300,000.00 0.00 Canceled 2020-01-13 2020-01-18 2020-02-29 2020-03-30 2020-05-04 2020-10-31 within the MFDP to automatic Financial Controls and Envelope GoL recurrent payment Systems LR-MFDP-196968-NC-RFQ / 2: Stabilizing and SLA for Support and Strengthening Performance of Request for Single Stage - One IDA / D5060 Post Limited 50,000.00 0.00 Canceled 2021-01-10 2021-03-07 2022-03-07 Maintenance of IFMIS Financial Controls and Quotations Envelope hardward environment Systems 2: Stabilizing and LR-MFDP-145263-NC-RFQ / Strengthening Performance of Request for Single Stage - One Deployment of LAN to 20 IDA / D5060 Post Limited 100,000.00 0.00 Canceled 2019-12-01 2020-01-26 2020-07-24 Financial Controls and Quotations Envelope IFMIS rollout sites Systems CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MFDP-81212-CS-CQS / 4: Improving Upstream and Consultant Consultant to Develop the M & IDA / V1080 Downstream PFM Systems in Post Qualification Open - National 39,600.00 0.00 Canceled 2018-11-08 2018-11-29 2019-01-12 2019-02-11 2019-03-18 2019-09-14 E Results Framework for PFM Selected Sectors Selection Strategy 2: Stabilizing and LR-MFDP-81208-CS-CQS / Consultant Strengthening Performance of Consultant to Develop Open IDA / V1080 Post Qualification Open - National 25,000.00 0.00 Canceled 2018-11-06 2018-11-27 2019-01-10 2019-02-09 2019-03-16 2019-09-12 Financial Controls and Budget National Action Plan Selection Systems LR-MFDP-81211-CS-LCS / Least Cost IDA / V1080 5: Project Management Post Open - National 20,000.00 0.00 Canceled 2018-11-12 2018-12-03 2019-01-16 2019-02-13 2019-03-15 2019-04-19 2019-05-24 2019-11-20 Firm to Conduct Audit of PPA Selection LR-MFDP-135794-CS-CQS / Consultant Consultancy for Independent IDA / D5060 5: Project Management Post Qualification Open - National 25,000.00 0.00 Canceled 2019-10-06 2019-10-02 2019-10-27 2019-12-10 2020-01-09 2020-02-13 2021-02-12 Verification Selection LR-MFDP-152805-CS-CQS / Consultant to facilitate Consultant 1: Enhancing DRM Sources technical workshop for IDA / D5060 Post Qualification Open - International 75,000.00 0.00 Canceled 2020-01-15 2019-12-19 2020-02-05 2020-01-09 2020-03-20 2020-03-05 2020-04-19 2020-05-24 2020-11-20 and Systems validation of VAT White Paper, Selection law and Migration Paper LR-MFDP-196923-CS-CQS / 2: Stabilizing and Consultancy for design, Consultant Strengthening Performance of Under installation, configuration and IDA / D5060 Post Qualification Open - National 185,000.00 0.00 2021-02-24 2021-02-24 2021-03-17 2021-03-12 2021-04-30 2021-05-30 2021-07-04 2021-12-31 Financial Controls and Implementation integration of the Local Area Selection Systems Network LR-MFDP-196918-CS-CQS / 2: Stabilizing and Consultant Consultancy to design, Strengthening Performance of Pending IDA / D5060 Post Qualification Open - International 300,000.00 0.00 2021-02-16 2021-03-09 2021-04-22 2021-05-22 2021-06-26 2021-12-23 develop and install GoL Data Financial Controls and Implementation Selection Portal at MFDP Systems LR-MFDP-212901-CS-CQS / Consulting Services for the Consultant 1: Enhancing DRM Sources Finalization and Validation of IDA / D5060 Post Qualification Open - International 100,000.00 0.00 Under Review 2019-12-19 2019-12-19 2020-01-09 2020-02-22 2020-03-23 2020-04-27 2020-10-24 and Systems the VAT Implementation Selection Package LR-MFDP-222825-CS-QBS / 2: Stabilizing and Consultancy to Provide PFM Strengthening Performance of Quality Based Under System Help Desk IDA / D5060 Prior Open - International 300,000.00 0.00 2021-04-02 2021-04-06 2021-04-23 2021-04-27 2021-06-06 2021-07-04 2021-08-03 2021-09-02 2021-10-07 2022-04-05 Financial Controls and Selection Implementation Management Solution for Systems MFDP LR-MFDP-197161-CS-CQS / 2: Stabilizing and Consultant Consultancy to conduct an Strengthening Performance of IDA / D5060 Post Qualification Open - National 100,000.00 0.00 Canceled 2021-01-18 2021-02-08 2021-03-24 2021-04-23 2021-05-28 2021-11-24 assessment of the additional Financial Controls and Selection 57 IFMIS rollout sites Systems INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual LR-MFDP-97537-CS-INDV / 1: Enhancing DRM Sources IDA / V1080 Post Consultant Open 176,850.00 216,000.00 Completed 2017-11-13 2017-10-05 2018-01-01 2018-02-14 2018-01-22 2018-02-22 2018-02-26 2018-04-30 2019-02-28 2019-02-28 Consultant for ITAS Advisor and Systems Selection LR-MFDP-97573-CS-INDV / Individual 1: Enhancing DRM Sources Consultant for Domestic IDA / V1080 Post Consultant Open 45,000.00 145,000.00 Completed 2017-12-06 2017-12-06 2018-01-24 2018-02-14 2018-02-14 2018-02-16 2018-03-21 2018-03-01 2019-01-31 2019-01-31 and Systems Resource Mobilization Selection LR-MFDP-97591-CS-INDV / Individual 1: Enhancing DRM Sources Senior Data Base IDA / V1080 Post Consultant Open 132,000.00 148,000.00 Completed 2017-12-06 2017-12-12 2018-01-24 2018-04-27 2018-02-14 2018-04-30 2018-03-21 2018-07-02 2019-02-28 2019-02-28 and Systems Administrator Selection LR-MFDP-97569-CS-INDV / Individual 1: Enhancing DRM Sources Consultant for Local ITAS IDA / V1080 Post Consultant Open 72,000.00 44,444.48 Completed 2017-12-06 2017-12-06 2018-01-24 2018-03-28 2018-02-14 2018-07-05 2018-03-21 2018-06-05 2019-02-28 2019-02-28 and Systems Advisor Selection LR-MFDP-97533-CS-INDV / Individual Consultant to Conduct 1: Enhancing DRM Sources IDA / V1080 Post Consultant Open 150,000.00 20,365.00 Completed 2018-01-29 2018-01-29 2018-03-19 2018-07-17 2018-04-09 2018-07-30 2018-05-14 2018-08-02 2019-02-28 2018-12-20 Business Process and Systems Selection Reengineering Page 3 LR-MFDP-97539-CS-INDV / Consultant to Undertake PFM 3: Improving Public-Sector Individual and Procurement Capacity IDA / V1080 Capacity for Enhanced Post Consultant Open 190,000.00 600.92 Completed 2018-04-23 2018-04-23 2018-06-11 2018-06-22 2018-07-02 2018-08-06 2018-08-06 2018-08-08 2018-11-30 2019-02-28 Needs Assessment and Oversight and Accountability Selection Develop LR-MFDP-97567-CS-CDS / International Procurement IDA / V1080 5: Project Management Post Direct Selection Direct 67,600.00 67,600.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2018-12-31 2018-12-31 Specialist 2: Stabilizing and LR-MFDP-97582-CS-CDS / Strengthening Performance of IDA / V1080 Post Direct Selection Direct 30,000.00 30,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Data Center Manager Financial Controls and Systems LR-MFDP-97563-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 18,000.00 24,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-01 2019-02-28 2019-02-28 M and E Officer LR-MFDP-97546-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 15,000.00 15,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Change Management Officer LR-MFDP-97595-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 12,000.00 16,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2019-02-28 2019-02-28 Administration Officer 2: Stabilizing and LR-MFDP-97574-CS-CDS / Strengthening Performance of IDA / V1080 Post Direct Selection Direct 24,000.00 32,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2019-02-28 2019-02-28 Data Base Administrator 1 Financial Controls and Systems 2: Stabilizing and LR-MFDP-97572-CS-CDS / Strengthening Performance of IDA / V1080 Post Direct Selection Direct 24,000.00 32,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2019-02-28 2019-02-28 Data Base Administrator 2 Financial Controls and Systems LR-MFDP-97577-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 18,000.00 18,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Coordinator NSA LR-MFDP-97585-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 9,000.00 12,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Grant Finance Officer LR-MFDP-97566-CS-CDS / Senior Assitant Internal IDA / V1080 5: Project Management Post Direct Selection Direct 19,500.00 119.82 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2019-02-28 2019-02-28 Auditor LR-MFDP-97442-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 12,000.00 0.00 Canceled 2018-07-02 2018-07-12 2018-09-15 2018-12-30 Assistant Internal Auditor 3: Improving Public-Sector LR-MFDP-97535-CS-CDS / IDA / V1080 Capacity for Enhanced Post Direct Selection Direct 15,939.00 15,939.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2018-12-31 2018-12-31 Registrar for FMTP and IPTP Oversight and Accountability 3: Improving Public-Sector LR-MFDP-97543-CS-CDS / IDA / V1080 Capacity for Enhanced Post Direct Selection Direct 31,200.00 31,200.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Director for FMTP and IPTP Oversight and Accountability LR-MFDP-97538-CS-CDS / 3: Improving Public-Sector Resident Coordinator for IDA / V1080 Capacity for Enhanced Post Direct Selection Direct 25,800.00 33,800.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 FMTP and IPTP Oversight and Accountability LR-MFDP-97536-CS-CDS / 3: Improving Public-Sector National Team Leader for IDA / V1080 Capacity for Enhanced Post Direct Selection Direct 25,200.00 25,200.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2018-12-31 2018-12-31 FMTP and IPTP Oversight and Accountability LR-MFDP-97575-CS-CDS / Senior Assistant Project IDA / V1080 5: Project Management Post Direct Selection Direct 12,000.00 16,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Accountant 2: Stabilizing and LR-MFDP-97596-CS-CDS / Strengthening Performance of PSM for various FreeBalance IDA / V1080 Post Direct Selection Direct 143,954.00 143,954.00 Completed 2017-07-28 2018-06-20 2017-08-07 2017-11-27 2017-10-11 2018-09-19 2018-07-02 2018-07-31 Financial Controls and Applications Modules Systems Individual LR-MFDP-135157-CS-INDV / IDA / V1080 5: Project Management Post Consultant Open 144,000.00 0.00 Canceled 2019-10-10 2019-09-23 2019-11-28 2019-12-09 2019-12-19 2020-01-23 2020-07-21 International IFMIS Advisor Selection LR-MFDP-135156-CS-INDV / Individual International Procurement IDA / D5060 5: Project Management Prior Consultant Open 144,000.00 39,250.00 Signed 2019-10-10 2019-10-02 2019-11-28 2019-12-17 2019-12-19 2020-01-27 2020-01-23 2020-01-28 2020-12-31 Advisor Selection LR-MFDP-135410-CS-INDV / 4: Improving Upstream and Individual Consultant to Develop IDA / D5060 Downstream PFM Systems in Prior Consultant Open 205,000.00 0.00 Canceled 2019-12-22 2020-02-09 2020-03-01 2020-04-05 2020-12-01 Electronic Personnel Action Selected Sectors Selection Notice LR-MFDP-135988-CS-INDV / 4: Improving Upstream and Individual Database Administrator for IDA / V1080 Downstream PFM Systems in Post Consultant Open 10,000.00 0.00 Canceled 2019-10-16 2019-10-18 2019-12-04 2019-12-25 2020-01-29 2020-07-27 PETS Selected Sectors Selection LR-MFDP-145141-CS-INDV / Consultant to conduct 2: Stabilizing and Individual detailed needs assessment for Strengthening Performance of IDA / D5060 Post Consultant Open 50,000.00 32,950.00 Completed 2019-12-12 2019-11-20 2020-01-30 2020-02-12 2020-02-20 2020-07-01 2020-03-26 2020-07-16 2020-09-22 2020-08-20 Technical and Functional Financial Controls and Selection System Requirements for Systems Open Data LR-MFDP-145145-CS-CDS / IDA / D5060 5: Project Management Post Direct Selection Direct 42,000.00 72,150.00 Signed 2019-11-12 2019-11-15 2019-11-22 2019-11-18 2020-01-26 2019-11-20 2021-01-25 M & E Officer for PMU LR-MFDP-145268-CS-CDS / Administration Officer for IDA / D5060 5: Project Management Post Direct Selection Direct 24,000.00 39,000.00 Signed 2019-11-12 2019-11-15 2019-11-22 2019-11-18 2020-01-26 2019-11-20 2021-01-25 PMU LR-MFDP-145266-CS-CDS / 3: Improving Public-Sector Coordinator for Non-State IDA / D5060 Capacity for Enhanced Post Direct Selection Direct 36,000.00 58,500.00 Signed 2019-11-12 2019-11-15 2019-11-22 2019-11-18 2020-01-26 2019-11-20 2021-01-25 Actors Secretariat Oversight and Accountability Page 4 LR-MFDP-145290-CS-INDV / 3: Improving Public-Sector Individual Institutional Support IDA / D5060 Capacity for Enhanced Post Consultant Open 36,000.00 36,000.00 Signed 2019-11-26 2019-11-11 2020-01-14 2020-01-30 2020-02-04 2020-03-11 2020-03-10 2020-03-12 2021-03-10 Consultant for UL Oversight and Accountability Selection LR-MFDP-145146-CS-CDS / 3: Improving Public-Sector Grants Finance Officer for Non- IDA / D5060 Capacity for Enhanced Post Direct Selection Direct 18,000.00 29,250.00 Signed 2019-11-19 2019-11-15 2019-11-29 2019-11-18 2020-02-02 2019-11-20 2021-02-01 State Actors Secretariat Oversight and Accountability LR-MFDP-145274-CS-INDV / Consultant to train members 3: Improving Public-Sector Individual of Parliament on the IDA / D5060 Capacity for Enhanced Post Consultant Limited 35,000.00 0.00 Canceled 2020-01-07 2020-01-12 2020-02-02 2020-03-08 2020-09-04 examination of statement of Oversight and Accountability Selection accountants of State Owned Enterprises 2: Stabilizing and LR-MFDP-150792-CS-CDS / Strengthening Performance of Activation of the IFMIS Budget IDA / D5060 Post Direct Selection Direct 380,000.00 306,440.00 Completed 2019-12-17 2019-07-12 2019-12-27 2019-07-22 2020-03-01 2019-07-16 2020-08-28 2020-12-30 Financial Controls and Module Systems 2: Stabilizing and LR-MFDP-145304-CS-CDS / Strengthening Performance of IDA / D5060 Post Direct Selection Direct 48,000.00 50,000.00 Signed 2019-11-19 2019-12-20 2019-11-29 2019-11-19 2020-02-02 2019-11-22 2021-02-01 Database Administrator 2 Financial Controls and Systems 2: Stabilizing and LR-MFDP-145302-CS-CDS / Strengthening Performance of IDA / D5060 Post Direct Selection Direct 48,000.00 50,000.00 Signed 2019-11-19 2019-11-20 2019-11-29 2019-11-19 2020-02-02 2019-11-22 2021-02-01 Database Administrator 1 Financial Controls and Systems LR-MFDP-145284-CS-CDS / 2: Stabilizing and Consultant to update and Strengthening Performance of IDA / D5060 Post Direct Selection Direct 100,000.00 120,000.00 Completed 2019-11-18 2019-10-28 2019-11-28 2019-11-18 2020-02-01 2020-01-16 2020-07-30 2020-03-10 revamp the 5 - Year IFMIS Financial Controls and Strategy Systems LR-MFDP-145526-CS-INDV / Consultant to conduct 2: Stabilizing and Individual institutional needs Strengthening Performance of IDA / D5060 Post Consultant Open 75,000.00 50,550.00 Signed 2020-02-17 2020-11-01 2020-04-06 2021-01-07 2020-04-27 2021-02-04 2020-06-01 2021-02-10 2020-11-28 assessment and develop Financial Controls and Selection capacity building plan for Systems MTEF Implementation LR-MFDP-150791-CS-CDS / 4: Improving Upstream and Develop, configure, integrate IDA / D5060 Downstream PFM Systems in Prior Direct Selection Direct 300,000.00 246,086.20 Completed 2020-01-06 2020-02-25 2020-01-16 2020-03-13 2020-03-21 2020-09-18 2020-09-17 2021-02-04 and deploy e-PAN Application Selected Sectors LR-MFDP-145278-CS-INDV / Consultant to facilitate Individual 1: Enhancing DRM Sources technical workshop for IDA / D5060 Post Consultant Open 25,000.00 0.00 Canceled 2020-02-12 2020-04-01 2020-04-22 2020-05-27 2020-11-23 and Systems Validation of VAT White Paper, Selection Law, and Migration Paper LR-MFDP-152800-CS-CDS / 4: Improving Upstream and Consultancy for Independent IDA / D5060 Downstream PFM Systems in Prior Direct Selection Direct 100,000.00 15,000.00 Completed 2020-01-15 2020-01-29 2020-01-25 2020-01-31 2020-03-30 2020-03-02 2020-09-26 2020-12-30 Verification Selected Sectors LR-MFDP-152801-CS-CDS / 2: Stabilizing and Consultancy to implement the Strengthening Performance of EFT System within the MFDP IDA / D5060 Prior Direct Selection Direct 300,000.00 654,059.82 Signed 2020-01-15 2020-02-25 2020-01-25 2020-02-12 2020-03-30 2020-08-19 2020-09-26 Financial Controls and to Automatic GoL Recurrent Systems Payment LR-MFDP-157299-CS-INDV / 4: Improving Upstream and Individual Database Administrator for IDA / D5060 Downstream PFM Systems in Post Consultant Limited 10,000.00 9,900.00 Signed 2020-02-12 2020-01-10 2020-02-17 2020-02-21 2020-03-09 2020-09-17 2020-04-13 2020-10-23 2020-10-10 PETS Selected Sectors Selection LR-MFDP-163491-CS-INDV / Individual 1: Enhancing DRM Sources Technical Focal Person for IDA / D5060 Post Consultant Open 48,000.00 54,000.00 Signed 2020-03-20 2020-03-25 2020-05-08 2020-07-02 2020-05-29 2020-08-25 2020-07-03 2020-08-31 2021-07-03 and Systems Revenue Selection LR-MFDP-163500-CS-INDV / Individual 1: Enhancing DRM Sources Technical Focal Person for IDA / D5060 Post Consultant Open 48,000.00 54,000.00 Signed 2020-03-20 2020-03-25 2020-05-08 2020-06-04 2020-05-29 2020-07-09 2020-07-03 2020-07-28 2021-07-03 and Systems Expenditure Selection 2: Stabilizing and Individual LR-MFDP-163487-CS-INDV / Strengthening Performance of IDA / D5060 Post Consultant Limited 180,000.00 197,633.33 Signed 2020-02-05 2020-02-13 2020-02-10 2020-02-19 2020-03-02 2020-09-03 2020-04-06 2020-10-20 2021-04-07 International IFMIS Advisor Financial Controls and Selection Systems LR-MFDP-163936-CS-INDV / 3: Improving Public-Sector Individual Consultant to Develop IDA / D5060 Capacity for Enhanced Post Consultant Open 75,000.00 35,000.00 Completed 2020-03-24 2020-03-10 2020-05-12 2020-06-01 2020-06-02 2020-07-10 2020-07-07 2020-07-17 2021-01-03 2020-08-20 Business/Strategic Plan for Oversight and Accountability Selection LICPA LR-MFDP-170136-CS-CDS / IDA / D5060 5: Project Management Post Direct Selection Direct 65,000.00 72,150.00 Signed 2020-03-03 2020-03-03 2020-03-13 2020-03-13 2020-05-17 2020-04-01 2021-05-17 Project Manager for PFMRISP LR-MFDP-175683-CS-CDS / 3: Improving Public-Sector Firm to configure and IDA / D5060 Capacity for Enhanced Post Direct Selection Direct 100,000.00 77,250.00 Signed 2020-04-02 2020-06-02 2020-04-12 2020-07-03 2020-06-16 2020-10-29 2020-12-13 enhance PENTANA Audit Oversight and Accountability Software LR-MFDP-179865-CS-CDS / Intwrnational Procurement IDA / D5060 5: Project Management Prior Direct Selection Direct 150,000.00 170,204.00 Signed 2020-06-10 2020-06-16 2020-06-20 2020-06-11 2020-08-24 2020-09-08 2021-08-24 Advisor 2: Stabilizing and LR-MFDP-135414-CS-INDV / Individual Strengthening Performance of Consultant to Provide Support IDA / D5060 Post Consultant Open 90,000.00 0.00 Canceled 2019-10-14 2019-10-18 2019-12-02 2020-01-14 2019-12-23 2020-02-26 2020-01-27 2020-07-31 Financial Controls and to GRPB Unit Selection Systems LR-MFDP-145520-CS-INDV / Individual Consultant to draft excise 1: Enhancing DRM Sources IDA / D5060 Post Consultant Open 10,000.00 0.00 Canceled 2020-02-12 2020-04-01 2020-04-22 2020-05-27 2020-11-23 stamp tax implementation and Systems Selection manual LR-MFDP-196970-CS-INDV / Individual Consultant to review and 1: Enhancing DRM Sources Pending IDA / D5060 Post Consultant Open 100,000.00 0.00 2021-02-23 2021-04-13 2021-05-04 2021-06-08 2021-12-05 redraft provision of the tax and Systems Implementation Selection code Page 5 LR-MFDP-196974-CS-INDV / 2: Stabilizing and Consultant to develop. Individual Strengthening Performance of Under Validate, and produce training IDA / D5060 Post Consultant Open 35,000.00 0.00 2021-03-10 2021-02-07 2021-04-28 2021-05-19 2021-06-23 2021-12-20 Financial Controls and Implementation manual of the IFMIS Budget Selection Systems Module LR-MFDP-197171-CS-INDV / 2: Stabilizing and Individual Consultant to update the Strengthening Performance of IDA / D5060 Post Consultant Open 50,000.00 0.00 Under Review 2021-03-11 2021-01-27 2021-04-29 2021-05-20 2021-06-24 2021-12-21 MTEF Manual and provide Financial Controls and Selection training Systems LR-MFDP-196990-CS-INDV / 2: Stabilizing and Consultant to build the Individual Strengthening Performance of Under capacity of the Gender IDA / D5060 Post Consultant Limited 90,000.00 0.00 2020-12-16 2020-09-24 2020-12-21 2021-01-11 2021-02-15 2021-08-14 Financial Controls and Implementation Responsive and Planning Selection Systems Budgeting (GRPB) Unit LR-MFDP-196916-CS-INDV / Consultant to develop an 3: Improving Public-Sector Individual Under implementation & operation IDA / D5060 Capacity for Enhanced Post Consultant Open 55,000.00 0.00 2021-02-22 2021-02-01 2021-04-12 2021-05-03 2021-06-07 2021-12-04 Implementation manual for PFM Reform Oversight and Accountability Selection Coordination Unit LR-MFDP-196939-CS-INDV / 3: Improving Public-Sector Individual Consultant to revise PFM Under IDA / D5060 Capacity for Enhanced Post Consultant Open 45,000.00 0.00 2021-03-18 2021-03-08 2021-05-06 2021-05-27 2021-07-01 2021-12-28 Regulations for Government Implementation Oversight and Accountability Selection of Liberia LR-MFDP-197166-CS-INDV / Capacity Building & Change Individual Under Management Specialist to IDA / D5060 5: Project Management Post Consultant Open 42,000.00 0.00 2021-02-09 2020-11-04 2021-03-30 2021-04-20 2021-05-25 2022-05-25 Implementation support the PFM Capacity Selection Building Strategy LR-MFDP-196934-CS-INDV / Economic Governance Individual Specialist to provide advisory IDA / D5060 5: Project Management Post Consultant Open 60,000.00 80,004.00 Signed 2020-12-12 2020-10-29 2021-01-30 2021-01-05 2021-02-20 2021-01-26 2021-03-27 2021-01-29 2022-03-27 services to the Minister of Selection Finance LR-MFDP-197179-CS-CDS / 2: Stabilizing and Consultancy for migration of Strengthening Performance of GoL harmonized payroll data IDA / D5060 Post Direct Selection Direct 175,000.00 168,976.40 Signed 2020-08-12 2020-08-26 2020-08-22 2020-08-28 2020-10-26 2020-12-18 2021-04-24 Financial Controls and to Civil Service Management Systems System 2: Stabilizing and LR-MFDP-196996-CS-CDS / Strengthening Performance of Under Consultancy for Migration of IDA / D5060 Post Direct Selection Direct 250,000.00 0.00 2021-03-05 2020-11-10 2021-03-15 2021-05-19 2021-11-15 Financial Controls and Implementation Donor Financed Projects Systems LR-MFDP-201277-CS-CDS / 2: Stabilizing and Consultant to Conduct Gap Strengthening Performance of IDA / D5060 Post Direct Selection Direct 28,000.00 29,655.00 Signed 2020-09-01 2020-10-01 2020-09-11 2020-10-19 2020-11-15 2020-10-23 2021-02-13 Analysis of the Ntional Data Financial Controls and Ware House Systems LR-MFDP-201265-CS-CDS / 3: Improving Public-Sector Consultant to Develop IDA / D5060 Capacity for Enhanced Post Direct Selection Direct 29,655.00 28,000.00 Completed 2020-09-01 2020-10-01 2020-09-11 2020-10-19 2020-11-15 2020-10-23 2021-02-13 2020-12-30 Business Plan, Strategic Plan Oversight and Accountability and Road Map for LICPA LR-MFDP-201983-CS-CDS / 4: Improving Upstream and GAC to Conduct Audit of the Under IDA / D5060 Downstream PFM Systems in Post Direct Selection Direct 20,000.00 0.00 2020-11-16 2020-11-09 2020-11-26 2021-01-30 2021-07-29 Government Harmonized Implementation Selected Sectors Payroll Data LR-MFDP-202587-CS-INDV / Consultant to Conduct Individual 1: Enhancing DRM Sources Under Baseline Review of the Liberia IDA / D5060 Post Consultant Open 75,000.00 0.00 2020-11-18 2020-11-09 2021-01-06 2021-01-27 2021-03-03 2021-08-30 and Systems Implementation Revenue Code as Amended in Selection 2019 LR-MFDP-135409-CS-INDV / 3: Improving Public-Sector Individual Senior Financial Management IDA / V1080 Capacity for Enhanced Post Consultant Open 48,000.00 0.00 Canceled 2019-10-14 2019-10-02 2019-12-02 2020-01-09 2019-12-23 2020-01-27 2021-01-26 Officer Oversight and Accountability Selection LR-MFDP-196975-CS-CDS / 2: Stabilizing and Consultancy to rollout the Strengthening Performance of Civil Service Management IDA / D5060 Post Direct Selection Direct 75,000.00 0.00 Canceled 2021-01-08 2021-01-18 2021-03-24 2021-09-20 Financial Controls and System (CSM) to Internal Systems Audit Agency 2: Stabilizing and LR-MFDP-196978-CS-INDV / Individual Strengthening Performance of Consultant to develop and IDA / D5060 Post Consultant Open 25,000.00 0.00 Canceled 2021-03-04 2021-04-22 2021-05-13 2021-06-17 2021-12-14 Financial Controls and establish risk register in MACs Selection Systems LR-MFDP-196997-CS-INDV / 2: Stabilizing and Individual Consultan to develop content Strengthening Performance of IDA / D5060 Post Consultant Open 50,000.00 0.00 Canceled 2021-02-19 2021-04-09 2021-04-30 2021-06-04 2021-12-01 specific for IFMIS training Financial Controls and Selection strategy for GoL Systems LR-MFDP-197163-CS-INDV / 2: Stabilizing and Consultant to conduct training Individual Strengthening Performance of needs analysis and develop a IDA / D5060 Post Consultant Open 50,000.00 0.00 Canceled 2021-03-21 2021-05-09 2021-05-30 2021-07-04 2021-12-31 Financial Controls and annual training program for Selection Systems IFMIS end users and ICT staff LR-MFDP-201275-CS-INDV / Individual Consultant to Review, Finalize, 1: Enhancing DRM Sources IDA / D5060 Post Consultant Open 75,000.00 0.00 Canceled 2020-11-02 2020-11-09 2020-12-21 2021-01-11 2021-02-15 2021-08-14 and validate existing VAT and Systems Selection Implementation Document LR-MFDP-236434-CS-CDS / 2: Stabilizing and Consultancy for IFMIS Dark Strengthening Performance of Under Fiber Connectivity Network IDA / D5060 Post Direct Selection Direct 175,000.00 0.00 2021-06-08 2021-06-10 2021-06-18 2021-08-22 2022-08-23 Financial Controls and Implementation and Data Center Co-location Systems Services Page 6 LR-MFDP-236435-CS-CDS / Consultant to Develop 2: Stabilizing and Application Programming Strengthening Performance of IDA / D5060 Post Direct Selection Direct 150,000.00 0.00 Under Review 2021-06-10 2021-06-10 2021-06-20 2021-08-24 2022-02-20 interface between IFMIS, Financial Controls and Revenue System, and the EFT Systems System Page 7 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: December, 2016 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: Jan 2017 to June 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 5 High risk installation of plant and equipment and PPP) 2. (Goods; Information Technology & 1.5 High risk Non-Consulting Services) 3. Consultant Services (Firms) 0.5 High risk 4. Consultant Services (Individual 0.2 High risk Consultants) 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements: NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. January 11, 2018 9. Renewal or extension of individual consultant’s contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. January 11, 2018 PROCUREMENT Kenya : Kenya Climate Smart Agriculture Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2019-10-02 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154784 GPN Date: 2018-02-08 Project Name: Kenya Climate Smart Agriculture Project Loan / Credit No: IDA / 59450 E Executing Agency(ies): lgeyo Marakwet County WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-ELGEYO MARAKWET - 168108-CW-RFQ / Component 1: Upscaling REHABILITATION OF KALWAL Climate-Smart Agricultural Pending Request for Single Stage - One 2020-09- WATER PAN- IDA / 59450 Practices (US$163.8 million Post Limited 186,963.00 0.00 Implementat 2020-04-20 2020-06-15 Quotations Envelope 13 EXPANSION,FENCING,PIPE equivalent, of which IDA ion WORK,CATTLE TROUGH AND US$150.0 million eq uivalent) LATRINE KE-ELGEYO MARAKWET - 168110-CW-RFB / Component 1: Upscaling CONSRUCTION OF CHUGOR- Climate-Smart Agricultural Pending KAPTORA IRRIGATION SCHEME- Single Stage - One 2020-11- IDA / 59450 Practices (US$163.8 million Post Request for Bids Open - National 203,419.00 0.00 Implementat 2020-04-15 2020-04-20 2020-06-01 2020-07-01 2020-08-05 INTAKE WORKS,MASONRY Envelope 03 equivalent, of which IDA ion TANK,PIPE US$150.0 million eq uivalent) WORK,FENCING,CANAL LINING AND AGRICULTURAL INPUTS KE-ELGEYO MARAKWET - 171973-CW-RFB / DESILTING Component 1: Upscaling OF KONDABILET HARAMBEE Climate-Smart Agricultural Under Single Stage - One 2020-11- DAM,CONSTRUCTION OF DAM IDA / 59450 Practices (US$163.8 million Post Request for Bids Limited 214,765.00 0.00 Implementat 2020-05-11 2019-03-05 2020-05-16 2019-03-05 2020-06-27 2020-07-27 2020-08-31 Envelope 29 ACCESSORIES(CATTLE equivalent, of which IDA ion TROUGH,LATRINE,PIPELINE US$150.0 million eq uivalent) AND FENCING Component 1: Upscaling KE-ELGEYO MARAKWET - Climate-Smart Agricultural Pending 171976-CW-RFB / Single Stage - One 2020-11- IDA / 59450 Practices (US$163.8 million Post Request for Bids Limited 257,667.00 0.00 Implementat 2020-05-11 2020-05-16 2020-06-27 2020-07-27 2020-08-31 COMPLETION OF KONDABILET Envelope 29 equivalent, of which IDA ion HARAMBEE DAM US$150.0 million eq uivalent) KE-ELGEYO MARAKWET - Component 1: Upscaling 235416-CW-RFQ / Climate-Smart Agricultural Pending ENHANCEMENT OF WATER Request for Single Stage - One Other (with field 2021-11- IDA / 59450 Practices (US$163.8 million Post Limited 136,600.00 0.00 Implementat 2021-06-02 2021-07-28 SUPPLY TO KIPCHUKUKUU Quotations Envelope for explanation) 25 equivalent, of which IDA ion IRRIGATION SCHEME IN US$150.0 million eq uivalent) EMSOO WARD KE-ELGEYO MARAKWET - Component 1: Upscaling 235419-CW-RFQ / Climate-Smart Agricultural Pending REHABILITATION,TESTING Request for Single Stage - One Other (with field 2021-11- IDA / 59450 Practices (US$163.8 million Post Limited 99,121.80 0.00 Implementat 2021-06-02 2021-07-28 AND COMMISSIONING OF Quotations Envelope for explanation) 25 equivalent, of which IDA ion KALWAL-KAPENDICH WATER US$150.0 million eq uivalent) PAN IN SOY SOUTH GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Upscaling Climate-Smart Agricultural KE-ELGEYO MARAKWET - Single Stage - One IDA / 59450 Practices (US$163.8 million Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2019-10-02 2019-10-07 2019-11-18 2019-12-18 2020-02-07 2020-02-21 137323-GO-RFB / computers Envelope equivalent, of which IDA US$150.0 million eq uivalent) KE-ELGEYO MARAKWET - Component 1: Upscaling 181444-GO-RFB / Climate-Smart Agricultural Pending Single Stage - One VACCINATION OF DAIRY IDA / 59450 Practices (US$163.8 million Post Request for Bids Limited 150,000.00 0.00 Implementati 2020-07-01 2020-07-06 2020-07-27 2020-08-26 2020-08-28 2020-10-27 Envelope COWS/HEIFERS AGAINST EAST equivalent, of which IDA on COAST FEVER DISEASE US$150.0 million eq uivalent) KE-ELGEYO MARAKWET - 194107-GO-RFQ / SUPPLY,DELIVERY AND Component 1: Upscaling INSTALLATION OF THREE IN Climate-Smart Agricultural Pending Request for Single Stage - One NUMBER SOLAR IRRIGATION IDA / 59450 Practices (US$163.8 million Post Limited 4,225.00 0.00 Implementati 2020-09-26 2020-10-21 2020-12-20 Quotations Envelope KITS FOR DEMONSTRATION equivalent, of which IDA on TO FARMER GROUPS IN US$150.0 million eq uivalent) SENGWER,SOY SOUTH AND ENDO WARDS. KE-ELGEYO MARAKWET - 235405-GO-RFQ / PURCHASE Component 4: Project OF NINE MOTORCYCLES FOR Coordination and Pending USE IN MARKET DATA Management (US$29.3 Request for Single Stage - One IDA / 59450 Post Limited 40,500.00 0.00 Implementati 2021-05-30 2021-07-25 2021-09-23 COLLECTION AND SUPPORT million equivalent, of which Quotations Envelope on EXTENSION SERVICES.THE IDA US$20.0 million MODEL IS DT175 OF 151- equivalent) 185CC NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Plan de Passation de marchés I. Généralités 1. L'information sur le projet : Pays : Madagascar ; Emprunteur : République de Madagascar ; Nom de projet : Projet Filets Sociaux de Sécurité – Financement Additionnel (P160 544) ; Numéro du Crédit : D1450-MG ; Agence d’exécution du Projet : Unité Programme National de Nutrition Communautaire. 2. Date d’approbation du Plan de passation de marchés par la Banque : - ; Révision : - ; 3. Date de notification du Plan Général de Passation de marchés : - ; 4. Période couverte par le Plan de Passation de marchés : DOUZE (12) mois. II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable : Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le paragraphe 3.1 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) et sur la base de l'évaluation de la capacité de l'agence d’exécution : Seuil de Méthode de Passation de revue à Commentaires marchés priori (USD) Les montants 1 Biens : AOI/AON/UN/ED 2 000 000 estimatifs des marchés prévus 2 Travaux : AOI/AON/ED 10 000 000 sont au-dessous des seuils. Niveau de Services autres que 3 2 000 000 risque : consultants : AOI/AON/UN/ED « SUBSTANTIEL » 2. Pré-qualification (selon les dispositions des paragraphes 6.19 à 6.24 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable. 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 6.52 et 6.53 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Manuels en cours de mise à jour 5. Tout autre arrangement spécial en passation de marchés : Non Applicable. 6. Allotissement de fournitures avec méthodes et calendrier : [Enumérer d’abord les allotissements qui nécessitent la revue préalable de la Banque, ensuite les autres allotissements] 1 2 3 4 5 6 7 8 9 Réf. No Description Contrat Approche/Méthod Revue de la Coût Pré- Préféren Date Commentaire e de sélection Banque (à estimatif qualificati ce prévue s priori / à (USD) on nationale d’ouverture posteriori) Oui / Non Oui / Non des soumission s Lot 1 : N°9 : Impression et Achevée multiplication de bulletins LIMITE 01 A.11 COT Post 12 000,00 NON NON 21-juin-18 Lot 2 : N°10 : en périodiques (02 numéros NATIONAL attente semestrielles) Maquette Acquisition outils de LIMITE Ordre de Service 03 A.11 COT Post 10 000,00 NON NON 13-mai-18 communication (Pagnes) NATIONAL signé Acquisition divers Pas encore LIMITE 04 A.17 équipements et mobiliers COT Post 5 000,00 NON NON 14-févr-19 lancée NATIONAL de bureau A programmer Acquisition de 293,2 SELECTION 1 475 246 Nouvelle activité 05 A.13 ED Post NON NON 12-févr-19 tonnes de Plumpy Sup DIRECTE ,46 PTA 2019 Acheminement vers LIMITE Nouvelle activité 06 A.13 Districts de 293,2 tonnes COT Post 77 644,55 NON NON 19-févr-19 NATIONAL PTA 2019 de Plumpy Sup Confection d’outils pour les sites : impression et LIMITE Nouvelle activité A.6.0 COT Post 11 812,50 NON NON 04-juin-19 livraison d’outils de NATIONAL PTA 2019 gestion : Registres Confection de plaques d'indication des sites et A.11.0 Supports de LIMITE Nouvelle activité COT Post 27 514,03 NON NON 04-juin-19 .1 communication : NATIONAL PTA 2019 Impression plaque, livrets et bulletins périodiques 1 2 3 4 5 6 7 8 9 Réf. No Description Contrat Approche/Méthod Revue de la Coût Pré- Préféren Date Commentaire e de sélection Banque (à estimatif qualificati ce prévue s priori / à (USD) on nationale d’ouverture posteriori) Oui / Non Oui / Non des soumission s Confection de Pagnes et A.11.0 T-shirt, Blouses pour LIMITE 17 578,13 Nouvelle activité .2 COT Post NON NON 04-juin-19 intervenants (Reny NATIONAL PTA 2019 mavitrika, …) Acquisition de matériels informatiques adaptés à l'actualisation du SIG et LIMITE Nouvelle activité A.14 COT Post 13 312,50 NON NON 04-juin-19 du développement du NATIONAL PTA 2019 Géoportail des données en ligne III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans le paragraphe 3 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) : Méthode de sélection Seuil de Commentaires revue à priori (USD) 1. Méthode compétitive (firmes) 1 000 000 Les montants 2. Entente directe (firmes) 1 000 000 estimatifs des 3. Méthode compétitive (Consultant 300 000 contrats prévus individuel) sont au-dessous 4. Entente directe (Consultant 300 000 des seuils. individuel) Niveau de risque : « SUBSTANTIEL » 2. Liste restreinte composée entièrement de consultants nationaux : Selon les dispositions du paragraphe 7.25 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016), la liste restreinte de consultants peut comporter entièrement des consultants nationaux pour les cas suivants : Catégorie de Montant estimatif consultant 1. Firmes Inférieur à USD 300 000 2. Consultants individuels Inférieur à USD 100 000 3. Tout autre arrangement spécial de Sélection de consultants : Non applicable 4. Tâches de consultation avec des méthodes de sélection et calendrier 1 2 3 4 5 6 7 Réf. No Description des missions Approche/Méth Revue de la Coût Date Commentaires ode de Banque (à estimatif prévue de sélection priori / à (USD) soumission posteriori) s des proposition s Consultant en charge de la maintenance Nouvelle activité PTA 01 A.14 ED ED Post 12 000,00 29-avril-19 du système Géoportail 2019 Consultants chargés de saisie des Nouvelle activité PTA 02 A.16 Registres des sites ED ED Post 34 321,33 20-mai-19 2019 Consultant Individuel en charge de Nouvelle activité PTA 03 B.2 l’élaboration de l’ICR INDV ED Post 5 000,00 21-mai-19 2019 IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier 1. Dans cette section, les activités de renforcement de capacité acceptées (quelques articles pourraient être des recommandations de CPAR) sont énumérées avec le calendrier No. Résultats Coût Durée Date de Commentaires escomptés / estimatif estimative début Description de l’activité PROCUREMENT Madagascar : Improving Nutrition Outcomes using the Multiphase Programmatic Approach PLAN General Information Country: Madagascar Bank’s Approval Date of the Original Procurement Plan: 2018-05-30 2021-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160848 GPN Date: 2020-09-07 Project Name: Improving Nutrition Outcomes using the Multiphase Programmatic Approach Loan / Credit No: IDA / D2570, IDA / V0970 H Executing Agency(ies): EALTH PROJECT COORDINATION UNIT - MINISTRY OF HEALTH WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MG-UCP-191249-CW-RFQ / Scale up coverage and Travaux de construction de Request for Single Stage - One 2021-04- IDA / D2570 utilization of the RMCHN Post Limited 116,433.00 6,518.58 Signed 2020-09-06 2019-10-01 2020-11-01 2019-12-18 283 fosses sécurisées dans Quotations Envelope 30 minimum package les 4 Régions du Projet PARN MG-UCP-01-TRV / Strengthen capacity to Request for Single Stage - One 2020-12- construction de 183 fosses IDA / D2570 manage and deliver the Post Limited 60,390.00 65,591.06 Completed 2020-11-20 2020-12-01 2020-12-16 2021-01-11 Quotations Envelope 31 sécurisées pour le Projet PARN RMCHN minimum package GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-UCP-60916-GO-RFQ / Acquisition de mobilier de bureau (table d'ordinateur, Project Management, Request for Single Stage - One table de bureau, armoir de IDA / D2570 Capacity Building and Post Open - National 7,467.00 1,320.46 Signed 2018-06-17 2018-08-12 2019-09-25 2018-11-10 Quotations Envelope rangement, fauteuil de Operations Support direction, chaise visiteur pour UCP et BCCP MG-UCP-61055-GO-DIR / Scale up coverage and Acquérir des plumpy nut pour IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 320,726.00 263,557.20 Completed 2018-07-02 2017-11-06 2018-07-07 2018-08-10 2018-08-21 2019-06-19 2019-02-17 2019-06-19 les CSB minimum package MG-UCP-61587-GO-RFB / Strengthen capacity to Acquérir des Carnet de santé Single Stage - One IDA / D2570 manage and deliver the Post Request for Bids Open - National 369,132.00 196,086.23 Signed 2018-06-18 2019-01-25 2018-06-23 2018-07-23 2019-02-25 2018-08-12 2019-02-26 2018-09-16 2019-05-13 2018-11-15 enfant, Acquérir des Carnets Envelope RMCHN minimum package de santé FE MG-UCP-61593-GO-DIR / Acquisition des lots de Scale up coverage and démarrage en intrants de IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 28,924.00 2,261.90 Completed 2018-06-25 2017-11-06 2018-06-30 2018-09-11 2018-08-19 2018-12-24 2018-10-18 2018-12-24 santé pour les sites minimum package communautaires MG-UCP-61596-GO-DIR / Scale up coverage and Acquisition des lots de IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 168,931.00 282,601.62 Completed 2018-07-02 2017-11-06 2018-07-07 2018-09-11 2018-08-21 2019-03-25 2018-10-20 2019-03-25 démarrage de médicaments minimum package pour les CSB MG-UCP-61602-GO-DIR / Strengthen capacity to Acquisition de véhicule pour IDA / D2570 manage and deliver the Post Direct Selection Direct 153,090.00 167,239.67 Signed 2018-06-18 2017-11-06 2018-06-23 2018-04-24 2018-08-27 2018-11-13 2019-02-23 DRS RMCHN minimum package MG-UCP-61603-GO-DIR / Project Management, Acquisition de voiture 4x4 IDA / D2570 Capacity Building and Post Direct Selection Direct 275,000.00 203,235.91 Signed 2018-06-18 2017-11-06 2018-06-23 2018-04-24 2018-08-27 2018-11-13 2019-02-23 pour BCC/UCP Operations Support MG-UCP-61690-GO-DIR / Acquisition de matériels de Scale up coverage and diagnostic de grossesse pour IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 35,072.00 3,692.68 Signed 2018-06-25 2017-11-06 2018-06-30 2018-09-21 2018-08-19 2018-12-24 2018-10-18 les sites communautaires et minimum package CSB MG-UCP-61800-GO-DIR / Scale up coverage and Acquérir des FAF pour les IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 39,343.00 28,840.82 Completed 2018-07-02 2017-11-06 2018-07-07 2018-09-26 2018-08-21 2018-12-24 2018-10-20 2018-12-24 Femmes enceintes minimum package MG-UCP-61839-GO-RFB / Scale up coverage and Acquisition d'EPI (Equipement Single Stage - One IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 135,200.00 54,118.59 Completed 2018-06-11 2018-10-01 2018-06-16 2019-06-28 2018-07-16 2018-11-15 2018-08-05 2018-11-22 2018-09-09 2019-03-18 2018-11-08 2019-03-26 de Protection Individuelle) Envelope minimum package pour CSB MG-UCP-61932-GO-DIR / Scale up coverage and Acquisition de motos pour le UN Agencies IDA / D2570 utilization of the RMCHN Post Direct 716,659.00 705,865.63 Signed 2018-06-11 2017-11-06 2018-06-16 2018-04-24 2018-08-05 2018-11-13 2019-02-01 CSB, et pour les Districts à (Direct) minimum package l'UNOPS MG-UCP-61935-GO-DIR / Scale up coverage and Acquérir les réfrigérateurs IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 585,840.00 461,670.12 Completed 2018-07-02 2017-11-06 2018-07-07 2018-09-14 2018-08-26 2018-12-11 2019-02-22 2018-12-11 solaires auprès de DOMETIC minimum package MG-UCP-61939-GO-DIR / Scale up coverage and Acquérir des plaquettes de 10 IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 1,485.00 1,201.25 Completed 2018-07-31 2017-11-06 2018-08-05 2018-10-05 2018-09-09 2018-12-24 2018-11-08 2018-12-24 comprimés de Zinc et sachets minimum package de SRO auprès de la SALAMA MG-UCP-61963-GO-DIR / Scale up coverage and Acquisition des produits IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 157,185.00 133,488.46 Completed 2018-06-27 2017-11-06 2018-07-02 2018-05-22 2018-08-06 2018-12-05 2018-11-04 2018-12-05 contraceptifs auprès de la minimum package SALAMA Page 1 MG-UCP-61966-GO-DIR / Acquisition des tablettes pour les Chefs CSB, des panneaux Strengthen capacity to solaires et matériels IDA / D2570 manage and deliver the Post Direct Selection Direct 579,167.00 493,940.00 Signed 2018-07-18 2017-11-06 2018-07-23 2019-01-30 2018-08-27 2020-06-30 2019-02-23 informatiques pour niveau RMCHN minimum package central - régional et district à UNOPS MG-UCP-61970-GO-DIR / Scale up coverage and Acheter des produits IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 43,503.00 3,298.49 Completed 2018-06-08 2017-11-06 2018-06-13 2018-12-13 2018-07-18 2018-12-24 2018-09-16 2018-12-24 dermatologiques auprès de la minimum package SALAMA MG-UCP-62653-GO-RFB / acquisition des matériels pour la salle de consultation Scale up coverage and Single Stage - One externe, de CPN, IDA / D2570 utilization of the RMCHN Post Request for Bids Open - International 939,128.00 1,066,917.56 Signed 2018-06-18 2019-01-24 2018-06-23 2019-02-04 2018-08-07 2019-03-07 2018-09-06 2019-05-31 2018-10-11 2019-09-10 2019-04-09 Envelope d'accouchement, des minimum package accouchés, DOPLER pour les CSB MG-UCP-62678-GO-RFB / multiplication de document de formation en PCIME clinique, Scale up coverage and Single Stage - One carte conseil PCIME, guides IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 301,784.00 13,998.13 Completed 2018-07-02 2019-01-25 2018-07-07 2019-06-20 2018-08-06 2019-04-09 2018-08-26 2019-04-09 2018-09-30 2019-08-26 2018-12-29 2019-08-27 Envelope PFI réactualisé, des outils de minimum package gestion CSB, et des carnets de santé FE MG-UCP-62682-GO-RFQ / Scale up coverage and Request for Single Stage - One acquisition de matériels et IDA / D2570 utilization of the RMCHN Post Limited 19,774.00 22,705.33 Signed 2018-07-07 2019-01-28 2018-09-01 2019-04-17 2018-10-31 Quotations Envelope fournitures pour sites minimum package MG-UCP-62692-GO-RFB / acquisition de brassards Scale up coverage and Under Request for Single Stage - One tricolores (MUAC) et montres IDA / D2570 utilization of the RMCHN Post Limited 13,498.00 0.00 Implementati 2018-07-07 2018-12-26 2018-09-01 2018-10-31 Quotations Envelope trotteuses pour sites PCIME minimum package on communautaire MG-UCP-64538-GO-RFQ / Scale up coverage and Request for Single Stage - One Acquisition kit TRO pour site IDA / D2570 utilization of the RMCHN Post Limited 10,540.00 18,798.18 Completed 2018-07-07 2019-01-22 2018-09-01 2019-06-11 2018-10-31 2019-06-11 Quotations Envelope communautaire minimum package Scale up coverage and MG-UCP-64544-GO-DIR / IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 60,000.00 59,925.18 Completed 2018-07-02 2017-11-06 2018-07-07 2018-12-20 2018-08-21 2018-12-24 2018-10-20 2018-12-24 Acquisition PZQ adulte minimum package MG-UCP-64545-GO-RFQ / Scale up coverage and Acquisition matériels Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Limited 19,774.00 0.00 Canceled 2018-07-07 2018-09-01 2018-10-31 médicaux et fourniture de Quotations Envelope minimum package bureau pour site MG-UCP-62683-GO-RFQ / Scale up coverage and acquisition des mannequins Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Limited 8,955.00 13,533.98 Completed 2018-07-03 2018-12-26 2018-08-28 2019-08-27 2018-10-27 2019-08-27 pour la formation des agents Quotations Envelope minimum package de santés SONUB MG-UCP-104950-GO-DIR / Project Management, Acquisition de véhicule pour IDA / V0970 Capacity Building and Post Direct Selection Direct 40,000.00 33,574.87 Signed 2019-03-08 2017-10-06 2019-03-09 2018-04-24 2019-03-12 2018-11-13 2019-03-22 DDP Operations Support MG-UCP-106148-GO-RFQ / Project Management, Request for Single Stage - One Doter les CSB en outil de IDA / V0970 Capacity Building and Post Limited 570,492.00 61,821.62 Completed 2019-03-15 2019-01-22 2019-04-21 2019-03-19 2019-04-25 2019-03-19 Quotations Envelope gestion (système Voucher) Operations Support MG-UCP-107047-GO-DIR / Project Management, Acquisition d'un véhicule 4X4 IDA / V0970 Capacity Building and Post Direct Selection Direct 35,821.00 67,335.51 Signed 2019-03-25 2017-10-06 2019-04-09 2019-06-18 2019-06-13 2019-09-13 2019-12-10 pour la CCTN-FBP Operations Support MG-UCP-109325-GO-RFQ / Project Management, Request for Single Stage - One Acquisition kit de retrait IDA / V0970 Capacity Building and Post Limited 7,360.00 31,275.18 Completed 2019-05-14 2019-07-26 2019-07-24 2019-09-25 2020-01-20 2019-09-25 Quotations Envelope Implanon Operations Support Project Management, MG-UCP-111283-GO-RFQ / Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 2,805.00 31,275.18 Completed 2019-05-20 2019-07-26 2019-07-15 2019-09-25 2020-01-11 2019-09-25 Acquisition kit DIU Quotations Envelope Operations Support MG-UCP-107051-GO-DIR / Acquisition de motocyclette Project Management, pour les EMAD pour la IDA / D2570 Capacity Building and Post Direct Selection Direct 17,910.00 139,246.16 Signed 2019-06-16 2019-03-19 2019-07-01 2019-06-19 2019-09-04 2019-09-13 2020-03-02 réalisation des vérifications de Operations Support la qualité dans les zone inaccesibles MG-UCP-117658-GO-RFQ / Project Management, Acquisition de matériel Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 15,045.00 35,270.01 Completed 2019-06-10 2019-06-27 2019-08-05 2019-10-07 2020-02-01 2019-10-07 informatique pour les Quotations Envelope Operations Support vérificateurs de la quantité MG-UCP-117662-GO-RFQ / Acquisition mobilier de Project Management, Under bureau des verificateurs de Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 5,134.00 0.00 Implementati 2019-06-10 2019-06-27 2019-08-05 2020-02-01 quantité (4 tables, 1 armoire, Quotations Envelope Operations Support on 4 chaises, 4 casques par district) FBP MG-UCP-125571-GO-DIR / Project Management, Acquisition de balance pèse IDA / D2570 Capacity Building and Post Direct Selection Direct 31,471.00 18,347.05 Signed 2018-07-12 2018-12-14 2018-08-11 2018-12-17 2018-10-15 2018-12-14 2019-04-13 bébé Operations Support MG-UCP-125581-GO-RFQ / Project Management, Request for Single Stage - One Multiplication les outils de IDA / D2570 Capacity Building and Post Limited 80,984.00 42,531.46 Signed 2019-08-17 2019-09-02 2019-10-12 2019-11-22 2020-04-09 Quotations Envelope gestion des plaintes Operations Support MG-UCP-62675-GO-RFB / Scale up coverage and Single Stage - One acquisition de kit IDA / D2570 utilization of the RMCHN Post Request for Bids Open - International 302,076.00 0.00 Canceled 2018-07-02 2018-11-13 2018-07-07 2018-08-21 2018-09-20 2018-10-25 2019-04-23 Envelope accouchement individuel minimum package MG-UCP-126542-GO-RFQ / Project Management, Pending Request for Single Stage - One Acquisition des 6 motos pour IDA / D2570 Capacity Building and Post Limited 13,433.00 0.00 Implementati 2019-08-13 2019-10-10 2019-12-09 Quotations Envelope les vérificateurs de quantité Operations Support on Page 2 MG-UCP-117653-GO-DIR / Project Management, Acquisition de 8 motocyclette IDA / D2570 Capacity Building and Post Direct Selection Direct 17,910.00 0.00 Canceled 2019-06-16 2019-03-19 2019-06-21 2019-06-19 2019-07-26 2020-01-22 pour les versificateurs de Operations Support quantité MG-UCP-126259-GO-RFQ / Project Management, Single Stage - One Multiplication des cartes IDA / D2570 Capacity Building and Post Request for Bids Open - National 116,065.00 0.00 Canceled 2019-09-02 2019-09-07 2019-10-07 2019-10-22 2019-11-25 2020-05-23 Envelope conseils PCIMEc Operations Support MG-UCP-126264-GO-DIR / Project Management, Acquisition de kit IDA / D2570 Capacity Building and Post Direct Selection Direct 380,446.00 87,761.80 Completed 2018-11-28 2018-11-20 2018-12-13 2018-11-28 2019-02-07 2019-05-23 2019-10-10 2019-05-23 accouchement individuel Operations Support (SALAMA) MG-UCP-135237-GO-RFQ / Project Management, Request for Single Stage - One Multiplication des cartes IDA / D2570 Capacity Building and Post Limited 98,344.00 19,847.78 Signed 2019-09-28 2019-09-02 2019-11-23 2019-11-07 2019-12-23 Quotations Envelope conseils PCIMEc Operations Support MG-UCP-142195-GO-DIR / Contingent Emergency Acquisition d'intrants pour IDA / D2570 Post Direct Selection Direct 7,700.00 183,995.34 Signed 2019-10-23 2019-10-22 2019-10-26 2019-10-24 2019-11-03 2019-10-24 2020-05-01 Response Component (CERC) riposte peste MG-UCP-60706-GO-RFQ / Acquisition de photocopieuse, Project Management, imprimante, vidéo projecteur, Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 28,314.00 0.00 Canceled 2018-06-15 2018-08-10 2018-10-09 scanner, Desk top, lap top, Quotations Envelope Operations Support imprimante et camera de surveillance pour BCCP et UCP MG-UCP-126620-GO-DIR / Project Management, Acquisition des plumpy nut IDA / D2570 Capacity Building and Post Direct Selection Direct 153,719.00 0.00 Canceled 2019-09-07 2019-09-17 2019-10-22 2019-12-21 pour les CSB (quantité Operations Support restante) MG-UCP-160793-GO-DIR / Scale up coverage and acquisitions de réfrigérateurs IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 1,252,261.00 1,068,660.61 Signed 2020-02-28 2020-02-28 2020-03-04 2020-02-28 2020-04-08 2020-03-12 2020-10-05 solaires destinés aux CSB minimum package MG-UCP-165534-GO-RFB / Fourniture de respirateur pour Contingent Emergency Request for Single Stage - One la prise en charge de qualité IDA / D2570 Post Limited 1,150,000.00 2,807,967.27 Signed 2020-04-03 2020-03-30 2020-04-12 2020-04-01 2020-06-11 Response Component (CERC) Quotations Envelope et humanisée des cas dans les centres de traitement MG-UCP-166613-GO-RFQ / fourniture de gel hydro- alcoolique pour la prise en Contingent Emergency Request for Single Stage - One IDA / D2570 Post Limited 81,081.00 65,246.86 Signed 2020-04-02 2020-03-24 2020-04-09 2020-05-06 2020-05-09 charge de qualité et Response Component (CERC) Quotations Envelope humanisée des cas dans les centres de traitement MG-UCP-167053-GO-RFQ / fourniture de concentrateur d'oxygène pour la prise en Contingent Emergency Request for Single Stage - One IDA / D2570 Post Limited 195,042.00 201,230.69 Signed 2020-04-03 2020-03-30 2020-04-10 2020-04-03 2020-06-09 charge de qualité et Response Component (CERC) Quotations Envelope humanisée des cas dans les centres de traitement MG-UCP-167065-GO-RFQ / fourniture de tentes de désinfection pour la prise en Contingent Emergency Request for Single Stage - One IDA / D2570 Post Limited 328,750.00 78,612.00 Signed 2020-04-04 2020-03-30 2020-04-10 2020-05-27 2020-06-09 charge de qualité et Response Component (CERC) Quotations Envelope humanisée des cas dans les centres de traitement MG-UCP-167062-GO-RFQ / Contingent Emergency Request for Single Stage - One fourniture de radiographie IDA / D2570 Post Limited 4,500,000.00 2,272,493.32 Signed 2020-04-02 2020-03-23 2020-04-09 2020-03-27 2020-06-08 Response Component (CERC) Quotations Envelope numérique MG-UCP-167056-GO-RFQ / fourniture de tentes "negative pressure isolation" pour la Contingent Emergency Request for Single Stage - One IDA / D2570 Post Limited 983,650.00 55,530.00 Signed 2020-04-03 2020-04-06 2020-04-10 2020-05-27 2020-06-09 prise en charge de qualité et Response Component (CERC) Quotations Envelope humanisée des cas dans les centres de traitement MG-UCP-166608-GO-DIR / Fourniture de masques FFP2 Contingent Emergency pour la prise en charge de IDA / D2570 Post Direct Selection Direct 645,000.00 0.00 Canceled 2020-03-31 2020-04-02 2020-04-07 2020-06-06 Response Component (CERC) qualité et humanisée des cas dans les centres de traitement MG-UCP-166609-GO-DIR / fourniture de combinaison Contingent Emergency pour la prise en charge de IDA / D2570 Post Direct Selection Direct 350,200.00 0.00 Canceled 2020-03-31 2020-04-02 2020-04-07 2020-06-06 Response Component (CERC) qualité et humanisée des cas dans les centres de traitement MG-UCP-166611-GO-DIR / fourniture de lunettes de protection pour la prise en Contingent Emergency IDA / D2570 Post Direct Selection Direct 16,068.00 0.00 Canceled 2020-03-31 2020-04-02 2020-04-07 2020-06-06 charge de qualité et Response Component (CERC) humanisée des cas dans les centres de traitement MG-UCP-177369-GO-RFQ / Contingent Emergency Request for Single Stage - One Acquisition de 1 000 000 IDA / D2570 Post Limited 875,000.00 2,997,714.75 Signed 2020-06-22 2020-04-02 2020-07-17 2020-04-14 2020-09-15 Response Component (CERC) Quotations Envelope masques FFP2 MG-UCP-177361-GO-RFQ / Contingent Emergency Request for Single Stage - One acquisition de 15 000 IDA / D2570 Post Limited 350,200.00 500,481.34 Signed 2020-06-21 2020-03-30 2020-07-05 2020-04-03 2020-09-03 Response Component (CERC) Quotations Envelope combinaison de protection MG-UCP-177370-GO-RFQ / Contingent Emergency Request for Single Stage - One Acquisition des masques IDA / D2570 Post Limited 700,000.00 818,181.00 Signed 2020-06-22 2020-03-30 2020-07-17 2020-04-03 2020-09-15 Response Component (CERC) Quotations Envelope chirurgicaux à 3 plis MG-UCP-177367-GO-RFQ / Contingent Emergency Request for Single Stage - One acquisition des 2 600 lunettes IDA / D2570 Post Limited 10,010.00 9,757.00 Completed 2020-06-21 2020-03-30 2020-08-07 2020-04-02 2021-02-03 2020-04-10 Response Component (CERC) Quotations Envelope de protection Page 3 MG-UCP-186168-GO-RFQ / Contingent Emergency Request for Single Stage - One acquisition de médicaments IDA / D2570 Post Limited 1,000,000.00 23,959.97 Signed 2020-08-02 2020-05-21 2020-08-27 2020-06-18 2020-09-26 Response Component (CERC) Quotations Envelope pour la riposte au Covid-19 MG-UCP-186097-GO-RFQ / Contingent Emergency Request for Single Stage - One acquisition de 1000 IDA / D2570 Post Limited 459,200.00 459,200.00 Completed 2020-08-19 2020-07-13 2020-09-02 2020-07-28 2020-09-17 2020-08-15 Response Component (CERC) Quotations Envelope concentrateurs d'oxygène MG-UCP-186082-GO-DIR / Acquisition de 64 respirateurs Pending Contingent Emergency UN Agencies pour la lutte contre la IDA / D2570 Post Direct 23,100.00 0.00 Implementati 2020-08-25 2020-08-30 2020-09-08 2020-11-07 Response Component (CERC) (Direct) pandémie Covid-19 à on Madagascar MG-UCP-186067-GO-DIR / Pending Acquisition des ambulances Contingent Emergency UN Agencies IDA / D2570 Post Direct 595,000.00 0.00 Implementati 2020-08-25 2020-08-30 2020-09-03 2020-10-03 médicalisées pour la lutte Response Component (CERC) (Direct) on contre la pandemie Covid-19 MG-UCP-187215-GO-RFB / Scale up coverage and acquisition de matériels pour Single Stage - One IDA / D2570 utilization of the RMCHN Prior Request for Bids Open - International 5,193,895.00 3,482,700.18 Signed 2020-08-27 2020-10-21 2020-09-01 2020-10-22 2020-10-01 2020-12-03 2020-10-31 2021-03-15 2020-11-21 2021-06-16 2021-02-04 les CSB du projet PARN, Envelope minimum package répartis en quatre lots MG-UCP-64549-GO-RFQ / Scale up coverage and Request for Single Stage - One Acquisition Poster et IDA / D2570 utilization of the RMCHN Post Limited 10,906.00 0.00 Canceled 2018-07-07 2018-09-01 2018-10-31 Quotations Envelope banderole minimum package MG-UCP-62686-GO-RFQ / Project Management, acquisition de tableau Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 6,000.00 0.00 Canceled 2018-06-16 2018-08-11 2018-10-10 d'affichage et socle Quotations Envelope Operations Support cartographie pour l'UCP MG-UCP-107055-GO-RFQ / Multiplication des kits de Project Management, démarrage en outils de Request for Single Stage - One IDA / V0970 Capacity Building and Post Open - National 63,194.00 0.00 Canceled 2019-04-09 2019-06-11 2019-12-08 gestion FBP et document Quotations Envelope Operations Support d'information plaidoyer sur le FBP MG-UCP-219306-GO-RFB / Scale up coverage and Pending Single Stage - One Fourniture de produits IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 104,863.61 0.00 Implementati 2021-02-17 2021-03-19 2021-04-30 2021-05-30 2021-07-04 2021-12-31 Envelope contraceptifs LEVOPLANT minimum package on MG-UCP-216107-GO-RFQ / Project Management, Fourniture de matériels Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 4,096.12 4,367.46 Signed 2021-02-25 2020-11-20 2021-04-13 2021-02-11 2021-06-12 informatiques pour la SDSP Quotations Envelope Operations Support Arivonimamo MG-UCP-217561-GO-RFQ / Project Management, Multiplication des Outils de Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 96,000.00 76,466.24 Signed 2021-02-13 2021-01-20 2021-03-22 2021-03-22 2021-04-21 Gestion Voucher pour 7 Quotations Envelope Operations Support Régions MG-UCP-216242-GO-RFQ / Project Management, Request for Single Stage - One Acquisition ds conteneurs IDA / D2570 Capacity Building and Post Limited 10,447.76 22,975.64 Signed 2021-02-16 2021-02-09 2021-03-30 2021-03-09 2021-04-29 Quotations Envelope pour les 7 régions PARN Operations Support MG-UCP-215575-GO-RFQ / Project Management, acquisition des kits IDA / D2570 Capacity Building and Post Direct Selection Direct 570,967.78 247,521.49 Signed 2021-01-22 2021-01-29 2021-01-29 2020-11-10 2021-02-22 2019-02-28 2021-06-22 individuels d'accouchement Operations Support (KIA) pour l'année 2021 MG-UCP-220988-GO-RFQ / Acquisition des plaquettes de Project Management, Request for Single Stage - One 10 comprimés de Zinc et SRO IDA / D2570 Capacity Building and Post Limited 14,392.00 16,970.10 Signed 2021-03-20 2021-03-02 2021-05-16 2019-02-28 2021-07-15 Quotations Envelope pour Analamanga et Alaotra Operations Support Mangoro MG-UCP-221732-GO-RFQ / Acquisition des kits TRO pour Scale up coverage and les CSB et les sites Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Limited 35,000.00 11,842.52 Signed 2021-03-10 2021-03-02 2021-05-05 2021-06-04 2021-11-01 communautaires dans les Quotations Envelope minimum package régions Analamanga et Alaotra Mangoro MG-UCP-221736-GO-RFQ / Acquisition des montres Scale up coverage and trotteuses pour les CSB et Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Open - National 12,056.34 5,416.52 Signed 2021-04-03 2021-03-25 2021-06-06 2021-06-02 2021-07-06 sites communautaires dans Quotations Envelope minimum package les régions Analamanga et Alaotra Mangoro MG-UCP-233728-GO-DIR / Scale up coverage and Acquisition de 132 motos IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 331,200.00 292,763.76 Signed 2021-05-17 2021-05-18 2021-05-27 2021-05-06 2021-07-03 2021-05-27 2021-09-01 pour les CSB minimum package MG-UCP-224326-GO-RFQ / Acquisition des brassards Scale up coverage and tricolores (MUAC) pour les Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Open - National 9,946.83 4,212.90 Signed 2021-06-07 2021-06-15 2021-08-17 2021-05-27 2021-09-16 sites communautaires pour Quotations Envelope minimum package les régiosn Analamanga et Alaotra Mangoro MG-UCP-233731-GO-RFQ / acquisition d'un véhicule 4x4 Scale up coverage and Under Request for Single Stage - One pour le Service Sauvegarde et IDA / D2570 utilization of the RMCHN Post Open - National 46,000.00 0.00 Implementati 2021-06-26 2021-06-23 2021-09-04 2021-10-19 Quotations Envelope Environnemental du Ministère minimum package on de al Santé Publique NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Scale up coverage and Under MG-UCP-64542-NC-DIR / IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 645,310.00 0.00 Implementati 2018-06-11 2018-06-16 2018-07-31 2023-07-05 Frais de prestation SALAMA minimum package on Page 4 MG-UCP-127119-NC-RFQ / Project Management, Request for Single Stage - One Location de voiture pour IDA / D2570 Capacity Building and Post Limited 11,172.00 0.00 Canceled 2019-09-02 2019-10-10 2020-04-07 Quotations Envelope acheminement OG Plainte Operations Support MG-UCP-179385-NC-RFB / Strengthen capacity to Single Stage - One multiplication des outils de IDA / D2570 manage and deliver the Post Request for Bids Open - National 397,361.52 170,988.41 Signed 2020-06-16 2020-06-03 2020-06-21 2020-10-02 2020-08-02 2020-07-03 2020-09-01 2020-08-11 2020-10-06 2020-08-25 2020-10-16 Envelope gestion répartis en dix lots RMCHN minimum package MG-UCP-235249-NC-RFB / Scale up coverage and Under Travaux de multiplication des Single Stage - One IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 261,341.00 0.00 Implementati 2021-06-09 2021-06-01 2021-06-19 2021-06-15 2021-07-19 2021-08-02 2021-08-23 2021-09-22 outils de gestion destinés au Envelope minimum package on Ministère de la Santé Publique MG-UCP-233619-GO-RFQ / travaux de multiplication des Scale up coverage and Pending cartes conseils et documents Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Open - National 55,444.00 0.00 Implementati 2021-06-10 2021-08-09 2021-09-08 de formations PCIME Clinique Quotations Envelope minimum package on destinés aux sites communautaires et aux CSB MG-UCP-239643-GO-RFQ / Scale up coverage and Under Request for Single Stage - One confection de tee shirt pour la IDA / D2570 utilization of the RMCHN Post Open - National 13,432.84 0.00 Implementati 2021-06-27 2021-06-23 2021-09-09 2021-09-15 Quotations Envelope gestion de plainte minimum package on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-UCP-63926-CS-CQS / Project Management, Consultant Cabinet de recrutement IDA / D2570 Capacity Building and Post Qualification Open - National 7,000.00 5,818.35 Signed 2018-05-23 2018-05-30 2018-05-23 2018-07-06 2018-07-19 2018-08-05 2018-08-10 2018-09-09 2018-10-11 2019-03-08 personnel restant de l'UCP Operations Support Selection MG-UCP-64962-CS-QCBS / Strengthen capacity to Elaborer le document Quality And Cost- IDA / D2570 manage and deliver the Post Open - National 14,155.00 0.00 Canceled 2018-06-07 2018-06-07 2018-06-28 2018-06-20 2018-07-27 2018-08-26 2018-09-15 2018-10-20 2018-11-24 2019-01-23 d'assistance technique en Based Selection RMCHN minimum package partenariat et investissement MG-UCP-87556-CS-LCS / Project Management, Least Cost Under audit des comptes des 2 IDA / D2570 Capacity Building and Post Open - National 15,000.00 0.00 2018-12-03 2018-12-04 2018-12-03 2018-12-17 2018-12-12 2019-01-14 2019-01-11 2019-01-29 2019-01-18 2019-02-27 2019-03-01 2019-04-03 2019-09-30 Selection Implementation UMOP pour l'année 2018 Operations Support MG-UCP-92289-CS-CDS / Project Management, UN Agencies assistance technique de IDA / D2570 Capacity Building and Prior Direct 4,641,998.00 4,641,998.00 Signed 2018-12-26 2019-01-31 2019-02-04 2019-03-11 2019-03-11 2019-03-26 2024-12-31 (Direct) l'UNICEF Operations Support MG-UCP-95218-CS-CDS / Project Management, UN Agencies Appui technique de l'OMS IDA / D2570 Capacity Building and Prior Direct 1,822,067.00 1,822,067.00 Signed 2019-02-04 2019-12-06 2019-02-15 2019-07-08 2019-02-20 2019-09-19 2021-02-19 (Direct) pour les sytème SIS Operations Support MG-UCP-104972-CS-CDS / Project Management, Consultant Contractualiser de personnel Pending IDA / V0970 Capacity Building and Post Qualification Open - National 688,977.00 0.00 2019-03-13 2019-04-03 2019-05-17 2019-06-16 2019-07-21 2020-01-17 de santé (Médecins, Implementation Operations Support Selection Paramédicaux) MG-UCP-109311-CS-CQS / Recrutement de deux Project Management, Consultant vérificateurs de la quantité IDA / V0970 Capacity Building and Post Qualification Open - National 4,567.00 0.00 Canceled 2019-04-09 2019-04-24 2019-05-23 2019-05-30 2019-06-07 2019-12-04 dans la Région de Haute Operations Support Selection Matsiatra MG-UCP-107065-CS-CQS / Project Management, Consultant Recrutement de deux IDA / V0970 Capacity Building and Post Qualification Open - National 7,164.00 0.00 Canceled 2019-04-09 2019-04-30 2019-05-22 2019-05-29 2019-06-12 2019-12-09 vérificateurs au niveau UCP Operations Support Selection MG-UCP-109225-CS-CQS / Recrutement de deux Project Management, Consultant vérificateurs de la quantité IDA / V0970 Capacity Building and Post Qualification Open - National 4,567.00 0.00 Canceled 2019-04-09 2019-04-24 2019-05-16 2019-05-23 2019-05-31 2019-11-27 dans la Région d'Amoron'i Operations Support Selection Mania MG-UCP-107045-CS-CQS / Project Management, Consultant Recrutement de deux IDA / V0970 Capacity Building and Post Qualification Open - National 4,567.00 0.00 Canceled 2019-04-09 2019-04-24 2019-05-16 2019-05-23 2019-06-01 2019-11-28 vérificateurs de la quantité Operations Support Selection dans la Région d'Itasy MG-UCP-109318-CS-CQS / Project Management, Consultant Recrutement d'un Assistant IDA / V0970 Capacity Building and Post Qualification Open - National 3,582.00 0.00 Canceled 2019-04-09 2019-04-15 2019-04-30 2019-05-22 2019-05-29 2019-06-12 2019-12-09 technique Voucher au niveau Operations Support Selection GCR dans la Région d'Itasy MG-UCP-109320-CS-CQS / Recrutement d'un Assistant Project Management, Consultant technique Voucher au niveau IDA / V0970 Capacity Building and Post Qualification Open - National 3,582.00 0.00 Canceled 2019-04-09 2019-04-15 2019-04-30 2019-05-22 2019-05-29 2019-06-12 2019-12-09 GCR dans la Région Operations Support Selection d'Amoron'i Mania MG-UCP-107068-CS-CQS / Recrutement d'un Assistant Project Management, Consultant technique Voucher au niveau IDA / V0970 Capacity Building and Post Qualification Open - National 3,582.00 0.00 Canceled 2019-03-25 2019-04-15 2019-04-15 2019-05-21 2019-05-28 2019-06-14 2019-12-11 GCR dans la Région de Haute Operations Support Selection Matsiatra MG-UCP-109198-CS-CQS / Recrutement de deux Project Management, Consultant vérificateurs de la quantité IDA / V0970 Capacity Building and Post Qualification Open - National 4,567.00 0.00 Canceled 2019-04-09 2019-04-24 2019-05-16 2019-05-23 2019-06-01 2019-11-28 dans la Région de Operations Support Selection Vakinakaratra MG-UCP-109319-CS-CQS / Recrutement d'un Assistant Project Management, Consultant technique Voucher au niveau IDA / V0970 Capacity Building and Post Qualification Open - National 3,582.00 0.00 Canceled 2019-04-09 2019-04-15 2019-04-30 2019-05-22 2019-05-29 2019-06-12 2019-12-09 GCR dans la Région de Operations Support Selection Vakinakaratra Page 5 MG-UCP-163629-CS-CDS / financement du plan de Project Management, UN Agencies contingence national pour la IDA / D2570 Capacity Building and Prior Direct 3,700,000.00 3,700,000.00 Signed 2020-03-07 2020-03-11 2020-04-16 2020-03-16 2020-05-21 2020-03-12 2020-11-17 (Direct) préparation et riposte à Operations Support l'épidémie de coronavirus MG-UCP-179476-CS-QCBS / Project Management, Quality And Cost- Under Sélection d'une agence IDA / D2570 Capacity Building and Post Open - National 47,761.19 86,552.75 2020-06-15 2020-06-12 2020-07-06 2020-09-21 2020-08-19 2020-10-09 2020-09-16 2020-11-19 2020-10-16 2020-11-20 2020-11-20 2020-12-15 2020-12-25 2021-12-25 Based Selection Implementation fiduciaire pour l'UCP Operations Support MG-UCP-157297-CS-QCBS / Project Management, Quality And Cost- sélection d'une agence IDA / D2570 Capacity Building and Post Open - International 47,761.19 0.00 Canceled 2020-02-06 2019-12-05 2020-02-27 2020-04-11 2020-02-14 2020-05-09 2020-03-16 2020-06-08 2020-05-05 2020-07-13 2020-08-17 2021-08-17 Based Selection fiduciaire Operations Support MG-UCP-215578-CS-QCBS / Sélection d'une firme chargée Strengthen capacity to de la réalisation de l'enquête Quality And Cost- IDA / D2570 manage and deliver the Post Open - National 430,000.00 365,555.18 Signed 2021-01-22 2019-11-28 2021-02-12 2021-02-09 2021-02-26 2020-01-24 2021-03-05 2020-02-24 2021-03-12 2020-03-24 2021-03-26 2020-06-10 2021-04-12 2020-09-30 2021-10-09 sur les indicateurs de Based Selection RMCHN minimum package prestation de services dans le secteur santé (SDI) MG-UCP-220922-CS-CQS / Recrutement d'un consultant Project Management, Consultant pour les études IDA / D2570 Capacity Building and Post Qualification Limited 15,000.00 0.00 Canceled 2021-02-23 2021-02-22 2021-02-25 2021-03-07 2021-03-29 2021-05-28 environnementales et sociales Operations Support Selection pour le projet MG-UCP-221493-CS-CQS / recrutement d'un consultant Project Management, Consultant pour les études IDA / D2570 Capacity Building and Post Qualification Limited 15,000.00 68,745.46 Signed 2021-02-24 2021-02-22 2021-03-05 2021-02-23 2021-03-15 2021-03-10 2021-03-27 2021-03-10 2021-05-26 environnementales et sociales Operations Support Selection requises pour le projet MG-UCP-222700-CS-QCBS / Recrutement d’une firme pour la validation des données des Project Management, Quality And Cost- Under agents de l’Etat à travers un IDA / D2570 Capacity Building and Post Open - National 500,000.00 0.00 2021-03-11 2021-03-03 2021-04-01 2021-05-15 2021-06-05 2021-06-20 2021-07-20 2021-08-13 2022-08-13 Based Selection Implementation recensement avec une Operations Support priorisation de secteur santé et éducation INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-UCP-61052-CS-INDV / Strengthen capacity to Individual Recrutement CI RBF pour la IDA / D2570 manage and deliver the Post Consultant Direct 123,000.00 93,000.00 Completed 2018-05-15 2018-07-18 2018-05-25 2018-07-31 2018-06-15 2018-07-18 2018-07-20 2018-07-31 2019-06-20 2018-07-31 mise à l'échelle des RBF RMCHN minimum package Selection existants PHILIPPE COMPAORE MG-UCP-64959-CS-CDS / recrutement de consultant Scale up coverage and individuel pour la mise à jour IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 11,931.00 6,626.10 Completed 2018-06-07 2018-05-28 2018-06-17 2018-11-15 2018-08-21 2018-11-29 2018-09-20 2018-11-29 de la politique Nationale de la minimum package Santé de la Reproduction des Adolescents MG-UCP-89393-CS-CDS / Recrutement d'une firme Strengthen capacity to spécialisée pour la conception IDA / D2570 manage and deliver the Post Direct Selection Direct 176,719.00 251,267.10 Signed 2018-12-26 2019-02-26 2019-01-05 2019-06-19 2019-03-11 2019-06-27 2019-09-07 et la mise en place du portail RMCHN minimum package FBP MG-UCP-95246-CS-CDS / Project Management, Cabinet de recrutement IDA / D2570 Capacity Building and Post Direct Selection Direct 7,000.00 9,689.33 Signed 2019-01-27 2019-02-26 2019-02-06 2019-02-26 2019-02-21 2019-03-01 2019-03-13 personnel UCP Operations Support Project Management, Individual MG-UCP-104979-CS-INDV / Under IDA / V0970 Capacity Building and Post Consultant Open 20,149.00 0.00 2019-03-08 2019-03-13 2019-03-08 2019-03-09 2019-03-14 2019-03-10 2019-09-06 Responsable Financier Implementation Operations Support Selection Project Management, Individual MG-UCP-104983-CS-INDV / Under IDA / V0970 Capacity Building and Post Consultant Open 20,149.00 0.00 2019-03-08 2019-03-13 2019-03-27 2019-04-06 2019-04-09 2019-12-11 Auditeur Interne Senior Implementation Operations Support Selection MG-UCP-104986-CS-INDV / Project Management, Individual Under Spécialiste en Sauvegarde IDA / V0970 Capacity Building and Post Consultant Open 20,149.00 0.00 2019-03-08 2019-03-13 2019-03-27 2019-04-10 2019-04-06 2019-10-01 2019-04-28 2019-12-31 Implementation Environnementale et Sociale Operations Support Selection MG-UCP-104989-CS-INDV / Project Management, Individual Responsable de Passation de IDA / V0970 Capacity Building and Post Consultant Open 20,149.00 13,526.49 Terminated 2019-03-08 2019-03-13 2019-04-01 2019-09-17 2019-04-11 2019-10-11 2019-05-06 2019-10-14 2019-12-31 Marchés Operations Support Selection MG-UCP-104968-CS-CDS / Project Management, Accompagnement préalable à IDA / V0970 Capacity Building and Post Direct Selection Direct 406,295.00 328,047.81 Completed 2019-03-08 2018-06-11 2019-03-09 2018-06-20 2019-03-13 2018-12-20 2019-12-31 2018-12-20 l'installation des médecins  Operations Support avec Santé Sud Project Management, Individual MG-UCP-104987-CS-INDV / IDA / V0970 Capacity Building and Post Consultant Open 20,149.00 15,574.09 Signed 2019-03-08 2018-12-01 2019-04-01 2019-04-09 2019-04-11 2019-09-30 2019-04-16 2019-10-01 2019-10-13 Point Focal PARN Operations Support Selection MG-UCP-107067-CS-CQS / Project Management, Individual Recrutement d'un Assistant Under IDA / V0970 Capacity Building and Post Consultant Open 3,582.00 0.00 2019-04-08 2019-11-28 2019-05-13 2019-05-18 2019-06-18 2019-12-15 technique Voucher au niveau Implementation Operations Support Selection DDS MG-UCP-104959-CS-CDS / Project Management, Acquisition de balance pèse IDA / V0970 Capacity Building and Post Direct Selection Direct 31,471.00 0.00 Canceled 2019-03-08 2019-03-18 2019-04-04 2019-04-14 bébé Operations Support MG-UCP-126549-CS-INDV / Project Management, Individual Under Auditeur Interne Senior (2ème IDA / D2570 Capacity Building and Post Consultant Open 5,037.00 0.00 2019-08-20 2019-10-08 2019-09-26 2019-10-03 2019-10-23 2019-12-22 Implementation relance) Operations Support Selection Page 6 MG-UCP-126802-CS-INDV / Project Management, Individual Under Recrutement Auditeur interne IDA / D2570 Capacity Building and Post Consultant Open 5,037.00 0.00 2019-08-20 2019-08-20 2019-09-19 2019-09-29 2019-10-19 2020-04-16 Implementation senior (2ème relance) Operations Support Selection MG-UCP-125575-CS-INDV / Project Management, Individual Recrutement d'un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 214.91 Signed 2019-04-25 2019-04-25 2019-06-13 2019-06-07 2019-07-04 2019-06-11 2019-08-08 2019-06-14 2019-12-31 de la quantité N° 1 A Ikongo Operations Support Selection MG-UCP-126561-CS-INDV / Project Management, Individual Recrutement d'un assistant Under IDA / D2570 Capacity Building and Post Consultant Open 5,838.50 0.00 2019-04-25 2019-11-28 2019-06-13 2019-07-04 2019-08-08 2019-12-31 technique Voucher au niveau Implementation Operations Support Selection Région Itasy MG-UCP-126281-CS-INDV / Project Management, Individual Under Recrutement d'un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 11,677.00 0.00 2019-04-25 2019-04-22 2019-06-13 2019-07-04 2019-08-08 2019-12-31 Implementation N° 1 au niveau de l'UCP Operations Support Selection MG-UCP-128968-CS-INDV / Project Management, Individual Recrutement d'un vérificateur Under IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 0.00 2019-04-25 2019-04-18 2019-06-13 2019-07-04 2019-08-08 2019-12-31 de la quantité N°1 à Implementation Operations Support Selection Ambatolampy MG-UCP-128970-CS-INDV / Project Management, Individual Recrutement d'un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 214.91 Signed 2019-04-25 2019-03-26 2019-06-13 2019-06-07 2019-07-04 2019-06-11 2019-08-08 2019-06-14 2019-12-31 de la quantité N° 1 à Operations Support Selection Vohipeno MG-UCP-128969-CS-INDV / Project Management, Individual Recrutement d'un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 214.85 Signed 2019-04-25 2019-04-26 2019-06-13 2019-06-07 2019-07-04 2020-06-11 2019-08-08 2019-06-14 2019-12-31 de la quantité N° 1 à Betafo Operations Support Selection MG-UCP-129153-CS-INDV / Project Management, Individual Recrutement d'un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 214.91 Signed 2019-04-25 2019-04-24 2019-06-13 2019-06-07 2019-07-04 2019-06-11 2019-08-08 2019-06-14 2019-12-31 de la quantité N° 2 à Operations Support Selection Vohipeno MG-UCP-129152-CS-INDV / Project Management, Individual Under Recrutement d'un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 0.00 2019-04-25 2019-04-25 2019-06-13 2019-07-04 2019-08-08 2019-12-31 Implementation de la quantité N° 2 à Betafo Operations Support Selection MG-UCP-128973-CS-INDV / Project Management, Individual Recrutement d'un assistant Under IDA / D2570 Capacity Building and Post Consultant Open 5,838.50 0.00 2019-04-25 2019-11-28 2019-06-13 2019-07-04 2019-08-08 2019-12-31 technique Voucher au niveau Implementation Operations Support Selection Région Vakinakaratra MG-UCP-128972-CS-INDV / Project Management, Individual Recrutement d'un assistant Under IDA / D2570 Capacity Building and Post Consultant Open 5,838.50 0.00 2019-04-25 2019-11-28 2019-06-13 2019-07-04 2019-08-08 2019-12-31 technique Voucher au niveau Implementation Operations Support Selection Région Haute Matsiatra MG-UCP-128971-CS-INDV / Project Management, Individual Recrutement d'un assistant Under IDA / D2570 Capacity Building and Post Consultant Open 5,838.50 0.00 2019-04-25 2019-11-28 2019-06-13 2019-07-04 2019-08-08 2019-12-31 technique Voucher au niveau Implementation Operations Support Selection Région Amoron'i Mania MG-UCP-128975-CS-CDS / Prestation de service pour le Project Management, dédouanement des IDA / D2570 Capacity Building and Post Direct Selection Direct 98,316.00 0.00 Signed 2018-11-11 2019-01-30 2018-11-21 2018-07-25 2019-01-25 2019-02-12 2019-12-31 fournitures et matériels de Operations Support l’UCP pour la mise en œuvre du Projet PARN MG-UCP-129155-CS-INDV / Project Management, Individual Recrutement d'un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 214.91 Signed 2019-04-25 2019-04-26 2019-06-13 2019-06-07 2019-07-04 2019-06-11 2019-08-08 2019-06-14 2019-12-31 de la quantité N°2 à Operations Support Selection Ambatolampy MG-UCP-129156-CS-INDV / Project Management, Individual Recrutement d'un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 314.63 Signed 2019-04-25 2019-04-24 2019-06-13 2019-06-07 2019-07-04 2019-12-26 2019-08-08 2019-12-30 2019-12-31 de la quantité N°2 à Ikongo Operations Support Selection MG-UCP-129157-CS-INDV / Project Management, Individual Under Recrutement d’un vérificateur IDA / D2570 Capacity Building and Post Consultant Open 2,284.00 0.00 2019-04-25 2019-04-23 2019-06-13 2019-07-04 2019-08-08 2019-12-31 Implementation N° 2 au niveau de l'UCP Operations Support Selection MG-UCP-135235-CS-CDS / Project Management, Accompagnement des IDA / D2570 Capacity Building and Post Direct Selection Direct 233,498.00 652,480.24 Completed 2019-09-23 2019-09-10 2019-10-03 2019-09-23 2019-12-07 2019-12-31 2020-06-04 2019-12-31 formations des prestataires et Operations Support assurance qualité (JHPIEGO) MG-UCP-140172-CS-CDS / Project Management, Cabinet de recrutement de IDA / D2570 Capacity Building and Post Direct Selection Direct 5,000.00 2,587.58 Signed 2019-10-14 2019-10-15 2019-10-24 2019-10-08 2019-12-28 2019-10-17 2020-12-31 l'Auditeur Interne Senior de Operations Support l'UCP MG-UCP-146546-CS-CDS / Strengthen capacity to prestation sur la contre IDA / D2570 manage and deliver the Post Direct Selection Direct 34,355.00 19,876.90 Completed 2019-11-21 2019-11-22 2019-12-01 2019-10-18 2020-02-04 2019-11-25 2020-08-02 2019-11-25 vérification du FBP RMCHN minimum package MG-UCP-126522-CS-INDV / Project Management, Individual Recrutement Agence Fiscal - IDA / D2570 Capacity Building and Post Consultant Open 11,940.00 0.00 Canceled 2019-08-20 2019-09-16 2019-10-08 2019-10-23 2019-11-23 2020-05-21 PARN Operations Support Selection MG-UCP-159670-CS-CDS / Project Management, selection de cabinet pour le IDA / D2570 Capacity Building and Post Direct Selection Direct 15,000.00 5,108.79 Signed 2020-02-17 2020-02-28 2020-02-27 2020-02-28 2020-05-02 2020-03-18 2020-10-29 recrutement de personnel du Operations Support projet MG-UCP-160774-CS-INDV / Strengthen capacity to Individual recrutement d'un consultant IDA / D2570 manage and deliver the Post Consultant Open 15,384.00 9,606.72 Signed 2020-02-21 2020-02-28 2020-04-10 2020-05-14 2020-05-01 2020-06-10 2020-06-05 2020-06-11 2020-12-02 coordinateur d'enquête et RMCHN minimum package Selection atelier de dissémination MG-UCP-160780-CS-INDV / recrutement de deux vérificateurs de la quantité Project Management, Individual pour le District de Under IDA / D2570 Capacity Building and Post Consultant Open 25,000.00 0.00 2020-02-28 2020-03-13 2020-04-17 2020-05-08 2020-06-12 2023-12-31 Tsiroanomandidy et deux Implementation Operations Support Selection vérificateurs de la quantité pour le District de Fenoarivobe Page 7 MG-UCP-172407-CS-INDV / Individual recrutement d'un agent Contingent Emergency IDA / D2570 Post Consultant Open 3,700.00 2,683.82 Completed 2020-05-06 2020-03-18 2020-05-25 2020-04-14 2020-05-27 2020-04-21 2020-05-31 2020-04-22 2020-08-29 2020-07-22 spécialiste en passation de Response Component (CERC) Selection marchés MG-UCP-172420-CS-INDV / Individual Contingent Emergency recrutement d'un gestionnaire IDA / D2570 Post Consultant Open 3,800.00 0.00 Canceled 2020-05-06 2020-03-18 2020-05-24 2020-05-26 2020-05-30 2020-08-28 Response Component (CERC) comptable pour l'UCP Selection MG-UCP-186139-CS-INDV / Individual Recrutement d'un Chef de Contingent Emergency IDA / D2570 Post Consultant Open 8,400.00 15,244.20 Terminated 2020-07-28 2020-01-17 2020-08-31 2020-07-03 2020-09-15 2020-07-03 2020-09-19 2020-07-03 2020-12-18 Service de la Passation de Response Component (CERC) Selection Marchés MG-UCP-186167-CS-CDS / recrutement d'un assistant Contingent Emergency Under IDA / D2570 Post Direct Selection Direct 3,700.00 0.00 2020-08-12 2020-07-07 2020-08-21 2020-09-01 2020-11-30 gestionnaire comptable pour Response Component (CERC) Implementation la riposte au Covid à l'UCP MG-UCP-195430-CS-INDV / Project Management, Individual Recrutement d'un Assistant en IDA / D2570 Capacity Building and Post Consultant Open 2,355.00 6,947.05 Signed 2020-09-21 2020-08-13 2020-11-09 2020-10-13 2020-11-30 2020-11-05 2021-01-04 2020-11-06 2021-07-03 passation des marchés de Operations Support Selection l'UCP MG-UCP-195444-CS-INDV / Project Management, Individual Recrutement d'un Auditeur IDA / D2570 Capacity Building and Post Consultant Open 2,355.00 7,513.33 Terminated 2020-09-21 2020-08-13 2020-11-09 2021-01-11 2020-11-30 2021-03-15 2021-01-04 2021-03-15 2021-07-03 Interne Assistant de l'UCP Operations Support Selection MG-UCP-195449-CS-INDV / Project Management, Individual Under Recrutement d'un Chef Service IDA / D2570 Capacity Building and Post Consultant Open 8,396.00 0.00 2020-09-21 2020-11-14 2020-11-09 2020-11-30 2021-01-04 2021-07-03 Implementation en passation des marchés Operations Support Selection MG-UCP-111049-CS-INDV / Project Management, Individual recrutement Responsable IDA / V0970 Capacity Building and Post Consultant Open 17,000.00 0.00 Canceled 2019-05-27 2019-07-15 2019-08-05 2019-09-09 2020-03-07 Passation de marché Operations Support Selection suppléant MG-UCP-111293-CS-INDV / Project Management, Individual Recrutement de quatre IDA / D2570 Capacity Building and Post Consultant Open 11,463.00 0.00 Canceled 2019-04-19 2019-06-07 2019-06-28 2019-08-02 2020-01-29 chauffeurs de l'UCP Operations Support Selection MG-UCP-213225-CS-CDS / Sélection d'un cabinet pour le Project Management, recrutement d'un chef service IDA / D2570 Capacity Building and Post Direct Selection Direct 2,788.00 2,130.89 Signed 2021-01-12 2021-01-12 2021-01-22 2021-01-14 2021-03-28 2021-02-04 2021-09-24 de la passation des marchés Operations Support de l'UCP MG-UCP-221465-CS-INDV / Recrutement de 4 Assistants Project Management, Individual Under techniques Voucher 2 ATV IDA / D2570 Capacity Building and Post Consultant Open 30,857.08 0.00 2021-02-26 2021-02-25 2021-04-04 2021-04-11 2021-04-19 2021-12-31 Implementation pour Analamanga et 2 ATV Operations Support Selection pour Alaotra Mangoro MG-UCP-235250-CS-CDS / Project Management, Elaboration des documents de IDA / D2570 Capacity Building and Post Direct Selection Direct 38,700.00 0.00 Under Review 2021-05-31 2021-05-25 2021-06-22 2021-07-19 2021-09-17 sauvegarde pour le nouveau Operations Support projet vaccination MG-UCP-240552-CS-INDV / Scale up coverage and Individual recrutement d'un Auditeur IDA / D2570 utilization of the RMCHN Post Consultant Open 7,000.00 0.00 Under Review 2021-06-28 2021-06-23 2021-08-05 2021-08-19 2021-09-16 2022-09-16 Interne Assistant de l'UCP minimum package Selection Page 8 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: December, 2016 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: Jan 2017 to June 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 5 High risk installation of plant and equipment and PPP) 2. (Goods; Information Technology & 1.5 High risk Non-Consulting Services) 3. Consultant Services (Firms) 0.5 High risk 4. Consultant Services (Individual 0.2 High risk Consultants) 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements: NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. January 11, 2018 9. Renewal or extension of individual consultant’s contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. January 11, 2018 PROCUREMENT Kenya : Kenya Climate Smart Agriculture Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2020-01-28 2021-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154784 GPN Date: 2018-02-08 Project Name: Kenya Climate Smart Agriculture Project Loan / Credit No: IDA / 59450 T Executing Agency(ies): aita Taveta County WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 1: Upscaling TTCG/AGRI/422/2018-2019 Climate-Smart Agricultural Single Stage - One 2019-11- / Construction of Ufunguo IDA / 59450 Practices (US$163.8 million Post Request for Bids Open - National 138,939.00 116,608.19 Completed 2019-02-07 2019-01-28 2019-02-12 2021-06-09 2019-03-26 2019-03-04 2019-04-25 2019-03-06 2019-05-30 2019-04-16 Envelope 26 Water Pan equivalent, of which IDA US$150.0 million eq uivalent) Component 1: Upscaling TTCG/AGRI/421/2018-2019 Climate-Smart Agricultural Single Stage - One 2019-07- / Rehabilitation of Njoro IDA / 59450 Practices (US$163.8 million Post Request for Bids Open - National 107,076.10 102,678.91 Completed 2019-02-07 2019-01-28 2019-02-08 2021-06-10 2019-03-01 2019-03-04 2019-03-31 2019-03-06 2019-04-15 2019-05-09 Envelope 14 Kubwa Canal equivalent, of which IDA US$150.0 million eq uivalent) Component 1: Upscaling Climate-Smart Agricultural TTCG/AGRI/423/2018-2019 Single Stage - One 2019-11- IDA / 59450 Practices (US$163.8 million Post Request for Bids Open - National 335,458.90 294,683.27 Completed 2019-02-07 2019-01-28 2019-02-12 2021-06-10 2019-03-26 2019-03-04 2019-04-25 2019-03-06 2019-05-30 2019-05-09 / Construction of Mkuru Dam Envelope 26 equivalent, of which IDA US$150.0 million eq uivalent) Component 4: Project TTCG/AGRIC&I/KCSAP/RFQ/9 Coordination and Request for Single Stage - One 2019-12- 67/2018-2019 / Renovation IDA / 59450 Management (US$29.3 Post Limited 24,025.29 22,923.63 Completed 2019-07-22 2019-05-16 2019-09-16 2019-06-18 Quotations Envelope 15 of Office million equivalent, of which IDA US$20.0 million equivalent) KE-TAITA TAVETA COUNTY- Component 1: Upscaling 183953-CW-RFQ / Climate-Smart Agricultural Pending Request for Single Stage - One 2020-11- CONSTRUCTION OF IDA / 59450 Practices (US$163.8 million Post Limited 54,929.83 0.00 Implementat 2020-08-01 2020-08-21 Quotations Envelope 19 ARTIFICIAL INSEMINATION equivalent, of which IDA ion CENTERS AND CRUSHES US$150.0 million eq uivalent) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Project TTCG/RFQ/KCSAP/967/2018- Coordination and Request for Single Stage - One 2019 / Supply and delivery of IDA / 59450 Management (US$29.3 Post Limited 18,155.34 17,322.84 Completed 2019-06-16 2019-05-28 2019-08-11 2019-06-17 2019-09-10 2019-06-28 Quotations Envelope Office Furniture million equivalent, of which IDA US$20.0 million equivalent) Component 1: Upscaling KE-TAITA TAVETA COUNTY- Climate-Smart Agricultural Pending 173721-GO-RFB / Supply and Single Stage - One IDA / 59450 Practices (US$163.8 million Post Request for Bids Open - National 355,000.00 0.00 Implementati 2020-07-01 2020-07-06 2020-08-05 2020-09-04 2020-09-25 2020-10-09 Delivery of Macadamia and Envelope equivalent, of which IDA on Mango Seedlings US$150.0 million eq uivalent) Component 1: Upscaling KE-TAITA TAVETA COUNTY- Climate-Smart Agricultural Pending 183207-GO-RFQ / SUPPLY Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 9,890.00 0.00 Implementati 2020-08-21 2020-09-10 2020-10-10 AND DELIVERY OF ICT Quotations Envelope equivalent, of which IDA on EQUIPMENT US$150.0 million eq uivalent) KE-TAITA TAVETA COUNTY- Component 1: Upscaling 183216-GO-RFQ / SUPPLY Climate-Smart Agricultural Pending AND DELIVERY OF ECF Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 38,978.00 0.00 Implementati 2020-08-21 2020-09-10 2020-10-10 VACCINES AND OTHER Quotations Envelope equivalent, of which IDA on ARTIFICIAL AND US$150.0 million eq uivalent) INSEMINATION APPARATUS Component 1: Upscaling KE-TAITA TAVETA COUNTY- Climate-Smart Agricultural Pending Request for Single Stage - One 188528-GO-RFQ / Supply IDA / 59450 Practices (US$163.8 million Post Limited 29,232.00 0.00 Implementati 2020-08-21 2020-09-10 2020-10-10 Quotations Envelope and Delivery of Motorbikes equivalent, of which IDA on US$150.0 million eq uivalent) Component 1: Upscaling KE-TAITA TAVETA COUNTY- Climate-Smart Agricultural Pending 233009-GO-RFQ / Supply Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 40,000.00 0.00 Implementati 2021-06-07 2021-07-05 2021-09-03 and Delivery of Motorcycles Quotations Envelope equivalent, of which IDA on for Data Collection US$150.0 million eq uivalent) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Component 1: Upscaling CGTT/RFP/351/2018-2019 / Climate-Smart Agricultural Quality And Cost- Pending Consultancy Services for IDA / 59450 Practices (US$163.8 million Post Open - National 97,053.40 0.00 2019-03-10 2019-03-31 2019-05-14 2019-06-11 2019-07-11 2019-08-15 2019-09-19 2020-09-18 Based Selection Implementation Advisory Services to Farmers equivalent, of which IDA US$150.0 million eq uivalent) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Upscaling KE-TAITA TAVETA COUNTY- Climate-Smart Agricultural Individual 189647-CS-INDV / Develop a Pending IDA / 59450 Practices (US$163.8 million Post Consultant Limited 22,000.00 0.00 2020-10-12 2020-10-17 2020-10-24 2020-11-07 2020-12-27 centralized breeding Implementation equivalent, of which IDA Selection information system US$150.0 million eq uivalent) Page 2 Improving the Performance of Non-Criminal Justice Services (P162833) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 05-Jun-2019 July 9, 2010 PROCUREMENT Peru : Improving the Performance of Non-Criminal Justice Services PLAN General Information Country: Peru Bank’s Approval Date of the Original Procurement Plan: 2020-12-22 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162833 GPN Date: Project Name: Improving the Performance of Non-Criminal Justice Services Loan / Credit No: IBRD / 89750 Poder Judicial UE002 Oficiona Coordinación de Proyectos Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PJ-208965-GO-RFQ / Component 1: Strengthening Adquisición de impresora Under the institutionality of the non- Request for Single Stage - One fotocopiadora, escáner de alto IBRD / 89750 Post Limited 50,000.00 0.00 Implementati 2020-12-21 2021-01-04 2021-02-03 criminal justice Quotations Envelope rendimiento y proyector on administration system multimedia Component 1: Strengthening Under PE-PJ-208969-GO-RFQ / the institutionality of the non- Request for Single Stage - One IBRD / 89750 Post Limited 15,000.00 0.00 Implementati 2020-12-21 2021-01-04 2021-02-03 Adquisición de UPS criminal justice Quotations Envelope on administration system PE-PJ-209136-GO-RFQ / Component 1: Strengthening Under Adquisición de Licencias the institutionality of the non- Request for Single Stage - One IBRD / 89750 Post Limited 37,000.00 0.00 Implementati 2020-12-21 2021-01-04 2021-02-03 antivirus para equipos criminal justice Quotations Envelope on informáticos administration system Component 1: Strengthening PE-PJ-209138-GO-RFQ / Under the institutionality of the non- Request for Single Stage - One Adquisición de computadores IBRD / 89750 Post Limited 50,000.00 0.00 Implementati 2020-12-21 2021-01-04 2021-02-03 criminal justice Quotations Envelope portátiles on administration system Component 1: Strengthening PE-PJ-209139-GO-RFQ / Under the institutionality of the non- Request for Single Stage - One Adquisición de computadores IBRD / 89750 Post Limited 50,000.00 0.00 Implementati 2020-12-21 2021-01-04 2021-02-03 criminal justice Quotations Envelope de escritorio on administration system Component 1: Strengthening Under PE-PJ-209141-GO-RFQ / the institutionality of the non- Request for Single Stage - One IBRD / 89750 Post Limited 7,000.00 0.00 Implementati 2020-12-21 2021-01-04 2021-02-03 Adquisición de Monitores Led criminal justice Quotations Envelope on administration system NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PJ-234531-CS-INDV / ESPECIALISTA EN ADQUISICIONES EN EL MARCO DEL PROGRAMA DE INVERSIÓN Component 4: Improving MEJORAMIENTO DE LOS Individual efficiency and efficacy of the Pending SERVICIOS DE JUSTICIA NO IBRD / 89750 Post Consultant Limited 156,156.16 0.00 2021-05-14 2021-05-19 2021-06-09 2021-07-14 2022-01-10 justice administration system Implementation PENALES A TRAVÉS DE LA Selection institutions. IMPLEMENTACIÓN DEL EXPEDIENTE JUDICIAL ELECTRÓNICO (EJE), DE CÓDIGO ÚNICO N° 2413068 PE-PJ-234534-CS-INDV / ESPECIALISTA FINANCIERO EN EL MARCO DEL PROGRAMA DE INVERSIÓN MEJORAMIENTO DE Component 4: Improving Individual LOS SERVICIOS DE JUSTICIA efficiency and efficacy of the Pending IBRD / 89750 Post Consultant Limited 156,156.16 0.00 2021-05-14 2021-05-19 2021-06-09 2021-07-14 2022-01-10 NO PENALES A TRAVÉS DE LA justice administration system Implementation Selection IMPLEMENTACIÓN DEL institutions. EXPEDIENTE JUDICIAL ELECTRÓNICO (EJE), DE CÓDIGO ÚNICO N° 2413068 Page 1 PE-PJ-234535-CS-INDV / ESPECIALISTA EN PROYECTOS EN EL MARCO DEL PROGRAMA DE INVERSIÓN MEJORAMIENTO Component 4: Improving Individual DE LOS SERVICIOS DE JUSTICIA efficiency and efficacy of the Pending IBRD / 89750 Post Consultant Limited 156,156.16 0.00 2021-05-14 2021-05-19 2021-06-09 2021-07-14 2022-01-10 NO PENALES A TRAVÉS DE LA justice administration system Implementation Selection IMPLEMENTACIÓN DEL institutions. EXPEDIENTE JUDICIAL ELECTRÓNICO (EJE), DE CÓDIGO ÚNICO N° 2413068 PE-PJ-234540-CS-INDV / ASESOR/A LEGAL EN EL MARCO DEL PROGRAMA DE INVERSIÓN MEJORAMIENTO DE Component 4: Improving Individual LOS SERVICIOS DE JUSTICIA efficiency and efficacy of the Under IBRD / 89750 Post Consultant Limited 156,156.16 0.00 2021-05-14 2021-05-26 2021-05-19 2021-06-09 2021-07-14 2022-01-10 NO PENALES A TRAVÉS DE LA justice administration system Implementation Selection IMPLEMENTACIÓN DEL institutions. EXPEDIENTE JUDICIAL ELECTRÓNICO (EJE), DE CÓDIGO ÚNICO N ° 2413068 PE-PJ-234541-CS-INDV / DIRECTOR/A DEL PROGRAMA EN EL MARCO DEL PROGRAMA DE INVERSIÓN MEJORAMIENTO Component 4: Improving Individual DE LOS SERVICIOS DE JUSTICIA efficiency and efficacy of the Under IBRD / 89750 Post Consultant Limited 197,101.45 0.00 2021-05-14 2021-05-19 2021-06-09 2021-07-14 2022-01-10 NO PENALES A TRAVÉS DE LA justice administration system Implementation Selection IMPLEMENTACIÓN DEL institutions. EXPEDIENTE JUDICIAL ELECTRÓNICO (EJE), DE CÓDIGO ÚNICO N° 2413068 PE-PJ-234669-CS-INDV / GESTOR/A DE PROYECTO EN EL MARCO DEL PROYECTO " MEJORAMIENTO DE LOS SERVICIOS DE FORMACION Y Component 4: Improving Individual CAPACITACION DE LA efficiency and efficacy of the Under IBRD / 89750 Post Consultant Limited 180,180.18 0.00 2021-05-14 2021-05-19 2021-06-09 2021-07-14 2022-01-10 ACADEMIA DE LA justice administration system Implementation Selection MAGISTRATURA PARA LA institutions. ADECUADA IMPLEMENTACION DEL EXPEDIENTE JUDICIAL ELECTRONICO DE CÓDIGO ÚNICO N ° 2412540 PE-PJ-234670-CS-INDV / ASISTENTE/A ADMINISTRATIVO EN EL MARCO DEL PROYECTO " MEJORAMIENTO DE LOS Component 4: Improving SERVICIOS DE FORMACION Y Individual efficiency and efficacy of the Under CAPACITACION DE LA IBRD / 89750 Post Consultant Limited 72,072.07 0.00 2021-05-14 2021-05-19 2021-06-09 2021-07-14 2022-01-10 justice administration system Implementation ACADEMIA DE LA Selection institutions. MAGISTRATURA PARA LA ADECUADA IMPLEMENTACION DEL EXPEDIENTE JUDICIAL ELECTRONICO DE CÓDIGO ÚNICO N ° 2412540 Page 2 MINISTRY OF HEALTH Transforming Health Systems for Universal Care Project Project Procurement Plan Financial Year 2016/2017 IDA CREDIT No. 5836-KE GFF Grant Agreement TF0A2561 PHRD Grant Agreement TF0A2792 General 1. Project information: The Government of Kenya has applied for a Credit from the International Development Association supporting the Transforming Health Systems or Universal Care Project 2. Bank’s approval Date of the procurement Plan [Original::] 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 1st June, 2016 to 31st December, 2017 II. Goods and Works and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Method Threshold Prior Review Threshold 1 ICB – Works ≥US$15 million ≥US$10 million 2 NCB- Works 7000 AOI ≥5000 Entre 200 et 7000 AON ≤200 DC 2. Biens et >3000 AOI ≥1500 Services non- Entre 100 et 3000 AON consultants ≤100 DC 3. A >300 SFQC, SCBD, SMC, ≥500 Consultants SFQ, Firmes ≤300 SQC 3.B Quelle que soit la Comparaison de 3 >200 Consultant valeur CV individuels N.B. : Les contrats passés par entente directe n’ont pas de seuils spécifiques (méthodes & seuils de revue préalable) en ce qui concerne la revue préalable de la Banque, il leur est appliqué les seuils indiqués dans le tableau ci-dessus. PROCUREMENT Eastern Africa : Great Lakes Regional Integrated Agriculture Development Project PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2018-07-17 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161781 GPN Date: Project Name: Great Lakes Regional Integrated Agriculture Development Project Loan / Credit No: / , IDA / D1810 Ministère de l'Agriculture et de l'Elevage Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BI-PIU-68406-CW-RFQ / Réhabilitation des bureaux 4. Project management and Request for Single Stage - One 2019-03- IDA / D1810 Post Limited 48,000.00 60,102.72 Completed 2018-07-09 2018-09-04 2018-09-03 2019-01-17 pour les Unités provinciales institutional support Quotations Envelope 02 de coordination du Projet BI-PIU-97499-CW-FCA / Travaux en régie pour Under l'entretien des infrastructures 1. Smallholders’ productivity 2019-10- IDA / D1810 Post Force Account Direct 24,380.00 0.00 Implementat 2019-02-25 2019-02-18 2019-03-02 2019-04-06 d'irrigation du périmètre de la and production enhancement 03 ion Société Régionale de Développement de l'Imbo BI-PIU-143954-CW-RFQ / Réhabilitation du hangar de 2. Support to investments in stockage de l’association de Request for Single Stage - One 2020-07- IDA / D1810 agro-processing and market Post Limited 40,000.00 0.00 Canceled 2019-11-20 2020-01-15 Batwa riziculteurs de la Quotations Envelope 13 linkages commune Rugombo/Province Cibitoke BI-PIU-198271-CW-RFB / Réaménagement et sécurisation des bureaux des Pending cinq (05) Unités Provinciales 4. Project management and Single Stage - One 2021-08- IDA / D1810 Post Request for Bids Open - National 80,000.00 0.00 Implementat 2020-10-14 2020-10-19 2020-11-30 2020-12-30 2021-02-03 de Coordination du Projet institutional support Envelope 02 ion Régional de Développement Agricole Intégré dans les Grands Lacs ( PRDAIGL) BI-PIU-203020-CW-RFB / Pending Construction d’abri pour le 1. Smallholders’ productivity Single Stage - One 2021-10- IDA / D1810 Post Request for Bids Open - National 45,000.00 0.00 Implementat 2021-01-04 2021-01-09 2021-02-20 2021-03-22 2021-04-26 liquéfacteur d’azote et ses and production enhancement Envelope 23 ion accessoires BI-PIU-226609-CW-RFB / Construction de trois centres Pending 4. Project management and Single Stage - One 2022-01- communaux de IDA / D1810 Post Request for Bids Open - National 144,600.00 0.00 Implementat 2021-04-12 2021-04-17 2021-05-29 2021-06-28 2021-08-02 institutional support Envelope 29 développement agro-sylvo- ion pastoral. BI-PIU-233913-CW-RFB / 3. Institutional integration, Request for Bids - Pending Construction d'une usine knowledge acquisition, and Single Stage - One Works (without 2022-03- IDA / D1810 Post Request for Bids Open - National 200,000.00 0.00 Implementat 2021-05-14 2021-05-19 2021-06-30 2021-07-30 2021-09-03 modulaire de production dissemination of information Envelope prequalification) 02 ion d'aflasafe at the regional level SPD GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-PIU-67839-GO-RFB / 1. Smallholders’ productivity Single Stage - One Acquisition des Motos et / Post Request for Bids Open - National 250,000.00 0.00 Canceled 2018-07-20 2018-07-25 2018-09-05 2018-10-05 2018-11-09 2019-05-08 and production enhancement Envelope accessoires (50 motos) BI-PIU-68443-GO-COMM / 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Commodities Limited 66,000.00 0.00 Canceled 2018-06-29 2018-08-14 2018-07-04 2018-09-05 2018-08-15 2018-12-04 2018-09-14 2018-12-04 2018-10-19 2019-10-19 Semences de riz pour 2018 and production enhancement Envelope BI-PIU-68444-GO-COMM / 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Commodities Limited 101,330.00 0.00 Canceled 2018-06-29 2018-08-13 2018-07-04 2018-08-28 2018-08-15 2018-09-14 2018-10-19 2019-10-19 Semences de maîs and production enhancement Envelope BI-PIU-67843-GO-RFB / Acquisition de véhicules pour 4. Project management and Single Stage - One l'Unité Nationale de IDA / D1810 Post Request for Bids Open - National 525,000.00 569,318.74 Completed 2018-07-29 2018-08-07 2018-08-03 2018-09-14 2018-09-11 2018-10-14 2018-10-04 2018-11-18 2018-10-22 2019-01-17 2019-02-07 institutional support Envelope Coordination du Projet et ses Unités Provinciales BI-PIU-68430-GO-RFB / Matériel informatique (portables, ord bureau, photocopieuses petits et Under grands modèles, imprimantes 4. Project management and Request for Single Stage - One / Post Limited 64,400.00 178,043.12 Implementati 2018-08-04 2018-08-30 2018-09-29 2019-03-28 petits et grands modèles, institutional support Quotations Envelope on onduleurs, vidéoprojecteur, tablettes et GPS/Camera) pour l'UCP, UPCP et pour Assistance technique nationale BI-PIU-80735-GO-RFQ / Pending Acquisition de fumure 1. Smallholders’ productivity Request for Single Stage - One IDA / D1810 Post Open - National 169,729.00 0.00 Implementati 2018-10-14 2018-12-09 2019-06-07 organique pour le riz et le and production enhancement Quotations Envelope on maïs, saisons 2019 A BI-PIU-97676-GO-RFB / Acquisition de semences de 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - International 506,667.00 0.00 Canceled 2019-02-25 2019-04-22 2019-03-02 2019-04-13 2019-05-13 2019-06-17 2019-12-14 maïs pour les saisons 2019 C and production enhancement Envelope et 2020 A BI-PIU-97848-GO-RFB / Fourniture d'engrais 1. Smallholders’ productivity Single Stage - One chimiques pour les cultures IDA / D1810 Prior Request for Bids Open - International 2,153,074.00 0.00 Canceled 2019-03-01 2019-04-30 2019-03-06 2019-04-17 2019-05-17 2019-06-21 2019-12-18 and production enhancement Envelope de riz et de maïs des saisons culturales 2019 C et 2020 A Page 1 BI-PIU-97852-GO-RFB / Fourniture de produits 1. Smallholders’ productivity Single Stage - One phytosanitaires pour les IDA / D1810 Post Request for Bids Open - National 334,991.00 127,663.25 Completed 2019-03-01 2019-03-22 2019-03-06 2019-04-17 2019-04-24 2019-05-17 2019-05-14 2019-06-21 2019-06-21 2019-12-18 2019-08-01 and production enhancement Envelope cultures de riz et de maïs des saisons 2019 C et 2020 A BI-PIU-97822-GO-DIR / Under Acquisition de semences de 1. Smallholders’ productivity IDA / D1810 Post Direct Selection Direct 144,442.00 0.00 Implementati 2019-03-11 2019-03-11 2019-03-16 2019-05-27 2019-04-20 2019-10-17 riz pour les saisons culturales and production enhancement on 2019 c et 2020 A BI-PIU-115436-GO-RFQ / 1. Smallholders’ productivity Request for Single Stage - One Acquisition de vaccins contre IDA / D1810 Post Limited 49,630.00 39,695.62 Completed 2019-05-22 2019-05-24 2019-07-17 2019-09-11 2020-01-13 2019-11-14 and production enhancement Quotations Envelope la dermatose nodulaire BI-PIU-116361-GO-RFB / Acquisition d'engrais 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Limited 497,360.00 519,560.00 Completed 2019-05-23 2019-06-20 2019-05-28 2019-06-20 2019-07-09 2019-07-09 2019-08-08 2019-08-06 2019-09-12 2019-09-03 2020-03-10 2019-10-07 chimiques pour la saison and production enhancement Envelope agricole 2019 BI-PIU-122584-GO-RFQ / 1. Smallholders’ productivity Request for Single Stage - One Fourniture de semences de IDA / D1810 Post Limited 37,000.00 54,035.26 Completed 2019-07-20 2019-07-22 2019-09-14 2019-08-16 2020-03-12 2019-09-09 and production enhancement Quotations Envelope maïs pour la saison 2019 C BI-PIU-122587-GO-RFB / Acquisition de 5 camionnettes double-cabine 4x4 pour les Unités provinciales de 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 585,000.00 0.00 Canceled 2019-08-19 2019-09-06 2019-08-24 2019-10-05 2019-11-05 2019-11-04 2019-11-29 2019-12-09 2020-06-06 coordination du Projet et 4 and production enhancement Envelope camionnettes DC 4x4 pour les partenaires nationaux d'exécution du Projet BI-PIU-133018-GO-RFQ / Acquisition de semences Under 1. Smallholders’ productivity Request for Single Stage - One sélectionnées de maïs IDA / D1810 Post Limited 92,500.00 0.00 Implementati 2019-09-14 2019-09-09 2019-11-09 2020-05-07 and production enhancement Quotations Envelope composite pour la saison on culturale 2020 A BI-PIU-134181-GO-RFB / Acquisition d'engrais 1. Smallholders’ productivity Single Stage - One chimiques pour les cultures IDA / D1810 Post Request for Bids Open - National 1,347,000.00 0.00 Canceled 2019-09-17 2019-09-22 2019-11-03 2019-12-03 2020-01-07 2020-07-05 and production enhancement Envelope de riz et de maïs de la saison culturale 2020 A BI-PIU-143967-GO-RFQ / Pending Fourniture d'équipement 1. Smallholders’ productivity Request for Single Stage - One IDA / D1810 Post Limited 95,000.00 0.00 Implementati 2019-11-16 2020-01-11 2020-07-09 scolaire aux enfants Batwa de and production enhancement Quotations Envelope on la zone du PRDAIGL BI-PIU-150324-GO-RFB / Acquisition et fourniture de 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - International 750,000.00 602,927.17 Signed 2020-01-06 2020-01-30 2020-01-11 2020-02-10 2020-02-22 2020-03-19 2020-03-23 2020-04-07 2020-04-27 2020-08-17 2020-10-24 750 vaches laitières aux and production enhancement Envelope bénéficiaires du Projet BI-PIU-159139-GO-RFB / Acquisition de 45 1. Smallholders’ productivity Single Stage - One motocyclettes pour les IDA / D1810 Post Request for Bids Open - National 685,000.00 508,107.68 Completed 2020-02-12 2020-03-06 2020-02-17 2020-03-30 2020-04-09 2020-04-29 2020-05-05 2020-06-03 2020-06-12 2020-11-30 2020-12-10 and production enhancement Envelope partenaires publics d'exécution du Projet BI-PIU-159579-GO-RFB / Fourniture de 35 450 kg de 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 174,500.00 0.00 Canceled 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 2020-12-19 Semences de maïs hybride de and production enhancement Envelope la saison 2020 C BI-PIU-169826-GO-RFB / Fourniture d'uniformes et sacs 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 97,500.00 79,987.52 Completed 2020-04-30 2020-05-27 2020-05-05 2020-06-16 2020-07-08 2020-07-16 2020-08-03 2020-08-20 2020-09-01 2021-02-16 2021-06-14 scolaires aux enfants Batwa and production enhancement Envelope de la zone du Projet BI-PIU-169919-GO-RFQ / Fourniture de semences Under 1. Smallholders’ productivity Request for Single Stage - One maraîchères aux bénéficiaires IDA / D1810 Post Limited 21,000.00 0.00 Implementati 2020-05-15 2020-05-28 2020-07-10 2021-01-06 and production enhancement Quotations Envelope du PRDAIGL pour la saison on culturale 2020 C BI-PIU-72461-GO-RFQ / 1. Smallholders’ productivity Single Stage - One Achat de pesticides pour le riz IDA / D1810 Post Request for Bids Open - National 147,530.00 138,235.50 Completed 2018-10-08 2018-10-18 2018-10-13 2018-11-24 2018-11-05 2018-12-24 2018-11-15 2019-01-28 2018-12-26 2019-07-27 2019-04-03 and production enhancement Envelope et le maïs BI-PIU-159188-GO-DIR / Fourniture de boutures de patate douce à chair orange aux bénéficiaires du Projet 1. Smallholders’ productivity Request for Single Stage - One des communes Buganda, IDA / D1810 Post Limited 22,600.00 0.00 Canceled 2020-05-16 2020-07-11 2021-01-07 and production enhancement Quotations Envelope Rugombo, Gihanga, Mpanda, Mutimbuzi, Kabezi, Muhuta, Bugarama, Rumonge et Nyanza-Lac BI-PIU-169363-GO-RFB / Fourniture de ciment pour appuyer les 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 105,000.00 67,228.39 Signed 2020-06-02 2020-06-30 2020-06-07 2020-07-19 2020-08-13 2020-08-18 2020-09-22 2020-09-22 2020-11-11 2021-03-21 bénéficiaires de bovins de la and production enhancement Envelope zone PRDAIGL dans la construction d'étables BI-PIU-159585-GO-DIR / Fourniture de 23 550 kg de Under Semences de riz de la saison 1. Smallholders’ productivity IDA / D1810 Post Direct Selection Direct 115,900.00 0.00 Implementati 2020-05-31 2020-06-09 2020-06-05 2020-06-10 2020-07-10 2021-01-06 2020 C par la Société and production enhancement on Régionale de Développement de l'Imbo (SRDI) BI-PIU-177131-GO-RFQ / Fourniture de trois mille deux cent (3200) boucles 1. Smallholders’ productivity Request for Single Stage - One IDA / D1810 Post Limited 14,000.00 11,342.48 Signed 2020-06-15 2020-06-16 2020-08-10 2020-09-03 2021-02-06 métalliques et quatre (4) and production enhancement Quotations Envelope pinces de marquage pour l’identification de bovins Page 2 BI-PIU-177662-GO-RFQ / Fourniture de semences sélectionnées de maïs 1. Smallholders’ productivity Request for Single Stage - One IDA / D1810 Post Limited 24,500.00 25,134.57 Completed 2020-06-13 2020-06-08 2020-08-08 2020-07-20 2021-02-04 2020-07-27 composite aux bénéficiaires and production enhancement Quotations Envelope de la zone du Projet pour la saison 2020 C BI-PIU-175670-GO-RFQ / Fourniture de boutures de patate douce à chair orange aux bénéficiaires du Projet 1. Smallholders’ productivity Request for Single Stage - One des communes Buganda, IDA / D1810 Post Limited 22,600.00 18,981.16 Completed 2020-06-14 2020-08-09 2020-07-20 2021-02-05 2020-08-21 and production enhancement Quotations Envelope Rugombo, Gihanga, Mpanda, Mutimbuzi, Kabezi, Muhuta, Bugarama, Rumonge et Nyanza-Lac BI-PIU-80732-GO-RFB / Acquisition d'engrais 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 1,400,300.00 700,292.00 Completed 2018-10-09 2018-10-18 2018-10-14 2018-11-25 2018-11-05 2018-12-25 2018-12-05 2019-01-29 2018-12-26 2019-07-28 2019-04-24 chimiques pour le riz et le and production enhancement Envelope maïs, saison 2019 A BI-PIU-191313-GO-RFQ / Fourniture de cahiers et 1. Smallholders’ productivity Request for Single Stage - One autres matériels scolaires aux IDA / D1810 Post Limited 36,400.00 0.00 Canceled 2020-09-13 2020-09-03 2020-11-08 2021-05-07 and production enhancement Quotations Envelope enfants Batwa de la zone du PRDAIGL BI-PIU-192732-GO-RFB / Fourniture de 172 vélos pour les moniteurs agricoles et les 1. Smallholders’ productivity Request for Single Stage - One IDA / D1810 Post Open - National 25,800.00 32,650.70 Completed 2020-09-19 2020-11-14 2021-03-09 2021-05-13 2021-05-05 agents de santé and production enhancement Quotations Envelope communautaire de la zone du PRDAIGL BI-PIU-192831-GO-RFB / Acquisition de kits d’accompagnement de bovins, 1. Smallholders’ productivity Single Stage - One de trousses chirurgicales à IDA / D1810 Post Request for Bids Open - National 263,880.00 113,627.37 Signed 2020-09-16 2020-09-30 2020-09-21 2020-11-02 2020-11-16 2020-12-02 2021-01-11 2021-01-06 2021-04-30 2021-07-05 and production enhancement Envelope usage vétérinaire ainsi que du matériel et équipements d'insémination artificielle BI-PIU-197210-GO-RFQ / 1. Smallholders’ productivity Request for Single Stage - One Fourniture de semences de IDA / D1810 Post Limited 1,320.00 0.00 Canceled 2020-10-10 2020-12-16 2020-12-05 2021-06-03 and production enhancement Quotations Envelope Haricots enrichis en fer BI-PIU-198298-GO-RFQ / Acquisition des boutures de Pending 1. Smallholders’ productivity Request for Single Stage - One bana grass pour appuyer les IDA / D1810 Post Open - National 83,000.00 0.00 Implementati 2020-10-19 2020-12-14 2021-06-12 and production enhancement Quotations Envelope futures bénéficiaires de on bovins BI-PIU-198751-GO-RFB / Under Acquisition du ciment pour 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 175,000.00 0.00 Implementati 2020-10-26 2020-12-29 2020-10-31 2021-01-06 2020-12-12 2021-02-22 2021-01-11 2021-02-15 2021-08-14 appuyer les bénéficiaires dans and production enhancement Envelope on la construction des étables BI-PIU-198756-GO-RFB / Under Acquisition de 1250 bovins 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 1,250,000.00 0.00 Implementati 2020-10-30 2020-12-21 2020-11-04 2020-12-30 2020-12-16 2021-02-18 2021-01-15 2021-02-19 2021-08-18 pour le développement de la and production enhancement Envelope on filière lait BI-PIU-211238-GO-RFQ / Pending Fourniture des semences 1. Smallholders’ productivity Request for Single Stage - One IDA / D1810 Post Open - National 32,083.00 0.00 Implementati 2021-01-16 2021-03-13 2021-09-09 maraichères pour les saisons and production enhancement Quotations Envelope on culturales 2021 B et C BI-PIU-211483-GO-RFB / Under Fourniture d'un liquéfacteur 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - International 1,200,000.00 0.00 Implementati 2021-01-05 2021-02-16 2021-01-10 2021-02-16 2021-02-21 2021-04-15 2021-03-23 2021-05-25 2021-04-27 2021-10-24 d'azote liquide et ses and production enhancement Envelope on accessoires BI-PIU-218327-GO-RFQ / Under 1. Smallholders’ productivity Request for Single Stage - One Fourniture de semences de IDA / D1810 Post Limited 1,320.00 0.00 Implementati 2021-02-20 2021-02-24 2021-04-17 2021-10-14 and production enhancement Quotations Envelope haricot enrichi en fer on BI-PIU-226611-GO-RFB / Acquisition des équipements, 3. Institutional integration, Pending réactifs et consommables de knowledge acquisition, and Single Stage - One IDA / D1810 Post Request for Bids Open - National 348,357.00 0.00 Implementati 2021-04-12 2021-04-17 2021-05-29 2021-06-28 2021-08-02 2022-01-29 laboratoires pour les Agences dissemination of information Envelope on d’Exécution du Projet at the regional level Nationales BI-PIU-226690-GO-RFB / Under Acquisition de kits 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 246,000.00 0.00 Implementati 2021-04-14 2021-05-31 2021-04-19 2021-06-10 2021-05-31 2021-06-30 2021-08-04 2022-01-31 d’accompagnement pour and production enhancement Envelope on 2250 bovins BI-PIU-226752-GO-RFQ / Acquisition de 280 kits Pending d’équipements pour les 1. Smallholders’ productivity Request for Single Stage - One IDA / D1810 Post Open - National 42,000.00 0.00 Implementati 2021-04-24 2021-06-19 2021-12-16 techniciens de terrain des and production enhancement Quotations Envelope on BPEAE et de la SRDI (bottines, imperméables, cartables) BI-PIU-226788-GO-RFQ / Under Fourniture de boutures de 1. Smallholders’ productivity Request for Single Stage - One IDA / D1810 Post Open - National 20,200.00 6,815.05 Implementati 2021-04-17 2021-06-12 2021-12-09 patate douce à chair orange and production enhancement Quotations Envelope on pour la saison 2021 C BI-PIU-226790-GO-RFQ / Fourniture de semences Under 1. Smallholders’ productivity Request for Single Stage - One maraichères aux bénéficiaires IDA / D1810 Post Open - National 16,070.00 10,810.80 Implementati 2021-04-20 2021-06-15 2021-12-12 and production enhancement Quotations Envelope du PRDAIGL pour la saison on 2021 C Page 3 BI-PIU-226749-GO-RFB / Acquisition des équipements informatiques pour l’Unité Nationale de Coordination, le Under 1. Smallholders’ productivity Single Stage - One Ministère de l’Environnement, IDA / D1810 Post Request for Bids Open - National 88,070.00 0.00 Implementati 2021-05-11 2021-05-10 2021-05-16 2021-05-18 2021-06-27 2021-07-27 2021-08-31 2022-02-27 and production enhancement Envelope de l’Agriculture et de l’Elevage on ainsi que les Agences d’Exécution du Projet Nationales BI-PIU-235898-GO-RFQ / Under Acquisition de 156 4. Project management and Request for Single Stage - One IDA / D1810 Post Limited 37,500.00 0.00 Implementati 2021-06-05 2021-06-01 2021-07-31 2022-01-27 smartphones pour la collecte institutional support Quotations Envelope on de données du PRDAIGL BI-PIU-237516-GO-RFB / Pending Fourniture de matériel 1. Smallholders’ productivity Single Stage - One IDA / D1810 Post Request for Bids Open - National 48,000.00 0.00 Implementati 2021-06-11 2021-06-16 2021-07-28 2021-08-27 2021-10-01 2022-03-30 scolaire aux écoliers et élèves and production enhancement Envelope on Batwa pour l’année 2021- 2022 BI-PIU-237625-GO-RFB / Fourniture de matériels de Pending communication et accessoires 4. Project management and Single Stage - One IDA / D1810 Post Request for Bids Open - National 15,250.00 0.00 Implementati 2021-06-11 2021-06-16 2021-07-28 2021-08-27 2021-10-01 2022-03-30 au Ministère de institutional support Envelope on l'Environnement, de l'Agriculture et de l'Elevage NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-PIU-68245-CS-CQS / Consultant Réalisation de la situation de 4. Project management and IDA / D1810 Post Qualification Open - National 45,000.00 0.00 Canceled 2018-07-03 2018-08-20 2018-07-24 2018-09-06 2018-10-06 2018-11-10 2019-05-09 référence des indicateurs du institutional support Selection Cadre de résultats BI-PIU-68413-CS-CQS / Consultant 4. Project management and Elaboration du manuel de IDA / D1810 Post Qualification Open - National 10,000.00 8,231.52 Completed 2018-06-29 2018-08-06 2018-07-20 2018-09-02 2018-09-27 2018-10-02 2018-11-22 2018-11-06 2018-12-05 2019-05-05 2020-03-16 institutional support gestion de matching grant Selection BI-PIU-68401-CS-CQS / Consultant 4. Project management and Under Informatisation du système de / Post Qualification Open - National 140,000.00 0.00 2018-06-29 2019-02-11 2018-07-20 2020-03-13 2018-09-02 2018-10-02 2018-11-06 2019-05-05 institutional support Implementation suivi-évaluation du Projet Selection BI-PIU-72463-CS-CQS / Recrutement d'une firme pour Consultant la réalisation d'une étude 4. Project management and IDA / D1810 Post Qualification Open - International 10,000.00 32,029.04 Completed 2018-08-06 2018-08-01 2018-08-27 2018-10-10 2018-11-14 2018-11-09 2018-11-15 2018-12-14 2018-12-06 2019-06-12 2019-04-30 socio-économique et institutional support Selection environnemental de la PPR auBurundi BI-PIU-72441-CS-QCBS / Audit institutionnel de la Consultant 1. Smallholders’ productivity CAPAD/recrutement et IDA / D1810 Post Qualification Limited 5,000.00 4,724.98 Completed 2018-12-19 2019-02-04 2019-01-02 2019-02-13 2019-02-01 2019-03-19 2019-03-08 2019-04-02 2019-09-04 2019-09-17 and production enhancement renforcement des capacités Selection d'une ONG BI-PIU-97229-CS-QCBS / ETUDE SUR LES OPPORTUNITES ET LES CONTRAINTES DE PARTICIPATION DES FEMMES, 1. Smallholders’ productivity Quality And Cost- DES JEUNES ET LES AUTRES IDA / D1810 Post Open - National 35,000.00 0.00 Canceled 2019-01-29 2019-07-28 2019-02-19 2019-04-04 2019-05-02 2019-06-01 2019-07-06 2019-08-10 2020-08-09 and production enhancement Based Selection CATEGORIES VULNERABLES DANS LES CHAINES DE VALEUR DES FILIERES MAIS, RIZ ET LAIT ET L'ELABORATION D'UNE STRATEGIE GENRE DU PROJET BI-PIU-97366-CS-QCBS / Audit institutionnel et organisationnel des Consultant 1. Smallholders’ productivity associations "Unissons-nous IDA / D1810 Post Qualification Open - National 10,000.00 8,899.44 Completed 2019-02-19 2019-05-06 2019-03-12 2019-06-26 2019-04-25 2019-11-29 2019-05-25 2020-01-20 2019-06-29 2020-01-31 2019-12-26 2020-06-29 and production enhancement pour la promotion des batwa" Selection (UNIPROBA) , Action Batwa et ADD BI-PIU-97351-CS-QCBS / Etudes de faisabilité techniques détaillées, surveillance et contrôle des travaux de développement 1. Smallholders’ productivity Quality And Cost- IDA / D1810 Prior Open - International 1,800,000.00 0.00 Under Review 2019-02-19 2019-04-30 2019-03-12 2019-08-12 2019-04-25 2020-02-26 2019-05-23 2020-04-28 2019-06-22 2020-09-02 2019-07-27 2019-08-31 2020-08-30 et/ou réhabilitation des and production enhancement Based Selection infrastructures d'irrigation dans les provinces Cibitoke (lot 1), Makamba et Rumonge (lot 2). BI-PIU-97336-CS-QCBS / Etudes de faisabilité techniques détaillées, surveillance et contrôle des travaux pour la reconstruction 1. Smallholders’ productivity Quality And Cost- IDA / D1810 Post Open - International 120,000.00 811,196.14 Signed 2019-03-13 2019-02-14 2019-04-03 2019-08-02 2019-05-17 2019-09-12 2019-06-14 2020-01-15 2019-07-14 2020-03-03 2019-08-18 2020-04-20 2019-09-22 2020-11-05 2020-09-21 du pont Kavimvira sur la and production enhancement Based Selection rivière Rusizi entre le Burundi et la RDC, au niveau de la TR 16 en commune Buganda, Province Cibitoke Page 4 BI-PIU-108936-CS-CQS / Recrutement d'un consultant Consultant chargé de l'élaboration d'un 4. Project management and IDA / D1810 Post Qualification Open - National 10,000.00 8,134.39 Completed 2019-04-04 2019-02-19 2019-04-25 2019-06-08 2019-09-30 2019-07-08 2019-12-12 2019-08-12 2020-01-06 2020-02-08 2021-05-14 guide de mécanismes de institutional support Selection gestion des plaintes et de recours BI-PIU-111339-CS-CQS / Etude d'évaluation et Consultant d'analyse de risques sanitaires 1. Smallholders’ productivity Under IDA / D1810 Post Qualification Limited 35,000.00 0.00 2019-04-20 2019-03-05 2019-05-04 2019-04-02 2019-06-03 2019-07-08 2020-01-04 liés à l'importation d'animaux and production enhancement Implementation Selection d'espèces bovine, caprine et ovine au Burundi BI-PIU-143963-CS-QCBS / Recrutement d’un bureau d’études pour la réalisation des études, du contrôle et de la surveillance (en option) 2. Support to investments in Quality And Cost- pour la construction IDA / D1810 agro-processing and market Post Open - National 100,000.00 0.00 Canceled 2019-11-18 2019-12-09 2020-01-22 2020-02-19 2020-03-20 2020-04-24 2020-05-29 2021-05-29 Based Selection d'infrastructures de gestion linkages post-récolte du maïs (hangars de stockage et aires de séchage) dans les 11 communes du PRDAIGL BI-PIU-143965-CS-CQS / Recrutement d’un bureau Consultant 4. Project management and Under chargé de la réalisation de la IDA / D1810 Post Qualification Open - National 65,000.00 0.00 2019-11-15 2019-12-13 2019-12-06 2020-01-19 2020-02-18 2020-03-24 2020-09-20 institutional support Implementation première enquête de Selection satisfaction des bénéficiaires BI-PIU-152782-CS-CQS / Recrutement de consultants pour l’actualisation de l'étude Consultant 1. Smallholders’ productivity institutionnelle et juridique de IDA / D1810 Post Qualification Open - National 65,000.00 0.00 Canceled 2020-01-27 2020-02-10 2020-02-17 2020-03-26 2020-04-01 2020-05-01 2020-06-05 2020-12-02 and production enhancement création et le fonctionnement Selection des Associations d'Usagers de l'Eau au niveau national BI-PIU-159612-CS-CQS / Recrutement d’un consultant 2. Support to investments in Consultant Under pour conduire l’incubation IDA / D1810 agro-processing and market Post Qualification Open - National 39,000.00 0.00 2020-03-16 2020-12-15 2020-04-06 2020-05-20 2020-06-19 2020-07-24 2021-01-20 Implementation des jeunes agro- linkages Selection entrepreneurs dans la zone du PRDAIGL BI-PIU-159596-CS-CQS / Recrutement d’un Bureau de consultants pour conduire 2. Support to investments in Consultant l’analyse sectorielle du climat Under IDA / D1810 agro-processing and market Post Qualification Open - National 40,000.00 0.00 2020-03-22 2020-10-20 2020-04-12 2020-12-10 2020-05-26 2021-04-15 2020-06-25 2020-07-30 2021-01-26 des affaires dans les chaînes Implementation linkages Selection de valeur ciblées par le PRDAIGL (riz, maïs et produits laitiers) dans la zone du Projet BI-PIU-164005-CS-CQS / Recrutement d'un bureau Consultant 4. Project management and pour effectuer l'audit externe IDA / D1810 Post Qualification Open - International 90,000.00 6,060.00 Completed 2020-03-23 2020-03-17 2020-04-13 2020-04-03 2020-05-27 2020-10-29 2020-06-26 2020-12-10 2020-07-31 2020-12-25 2021-01-27 2021-01-26 institutional support du PRDAIGL, exercices 2019- Selection 2022 BI-PIU-143961-CS-QCBS / Recrutement d’un bureau d’études chargé de la réalisation des études, du contrôle et de la surveillance 2. Support to investments in Quality And Cost- (en option) pour la IDA / D1810 agro-processing and market Post Open - National 240,000.00 0.00 Canceled 2019-11-18 2020-01-13 2019-12-09 2020-03-02 2020-01-22 2020-02-19 2020-03-20 2020-04-24 2020-05-29 2021-05-29 Based Selection réhabilitation/Construction linkages des pistes de désenclavement et d’accès aux marchés des zones à forte production du maïs, ainsi que BI-PIU-143961-CS-QCBS-2 / Etudes de faisabilité technique détaillées, surveillance et contrôle des travaux de 2. Support to investments in Quality And Cost- réhabilitation d'environ 74 km IDA / D1810 agro-processing and market Post Open - National 240,000.00 304,029.10 Signed 2020-07-27 2020-01-13 2020-08-17 2020-09-30 2020-06-12 2020-10-28 2020-07-24 2020-11-27 2020-08-31 2021-01-01 2020-10-20 2021-02-05 2021-02-22 2022-02-05 Based Selection de pistes de désenclavement linkages et d'accès aux marchés des zones de forte production de maïs et de lait (phase 1) BI-PIU-198765-CS-QCBS / Recrutement d’une Organisation Non Gouvernementale (ONG) locale spécialisée pour assurer la 1. Smallholders’ productivity Quality And Cost- restructuration des IDA / D1810 Prior Open - National 512,000.00 0.00 Canceled 2020-10-19 2021-01-18 2020-11-09 2020-12-23 2021-01-20 2021-02-19 2021-03-26 2021-04-30 2022-04-30 and production enhancement Based Selection organisations des producteurs, les accompagner dans la reconnaissance légale et assurer leur renforcement des capacités BI-PIU-205826-CS-CQS / ETUDE JURIDIQUE ET INSTITUTIONNELLE DE CREATION, STRUCTURATION Consultant ET FONCTIONNEMENT DES 1. Smallholders’ productivity Under IDA / D1810 Post Qualification 85,000.00 0.00 2020-11-27 2020-12-02 2020-12-18 2020-12-15 2021-01-31 2021-03-30 2021-03-02 2021-04-06 2021-10-03 ASSOCIATIONS D’USAGERS DE and production enhancement Implementation Selection L’EAU (AUE) POUR LA GESTION DURABLE DES PERIMETRES AMENAGES ET IRRIGUES AU BURUNDI. BI-PIU-206232-CS-CQS / Recrutement d'une Consultant 1. Smallholders’ productivity Pending Association des Batwa pour la IDA / D1810 Post Qualification Limited 12,000.00 0.00 2020-12-11 2020-12-25 2021-01-24 2021-02-28 2021-08-27 and production enhancement Implementation facilitation de la mise en Selection œuvre des Appuis des Batwa, Page 5 BI-PIU-226687-CS-QCBS / Etudes, surveillance et contrôle pour la construction d'infrastructures de stockage/transformation et de 2. Support to investments in Quality And Cost- Under commercialisation pour le riz IDA / D1810 agro-processing and market Post Open - International 366,200.00 0.00 2021-04-27 2021-05-18 2021-05-18 2021-07-01 2021-07-29 2021-08-28 2021-10-02 2021-11-06 2022-11-06 Based Selection Implementation et le maïs (lot 1), linkages d'infrastructures laitières (lot 2), et d’une usine de transformation de fruits et légumes (lot 3) BI-PIU-231479-CS-QCBS / Recrutement d’une Organisation Non Gouvernementale (ONG) locale spécialisée pour assurer la 1. Smallholders’ productivity Quality And Cost- Under restructuration des IDA / D1810 Prior Open - International 512,000.00 0.00 2021-04-30 2021-04-28 2021-05-21 2021-05-06 2021-07-04 2021-08-01 2021-08-31 2021-10-05 2021-11-09 2022-11-09 and production enhancement Based Selection Implementation organisations de producteurs, les accompagner dans la reconnaissance légale et assurer leur renforcement des capacités INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-PIU-68394-CS-CDS / Fourniture d'un logiciel 4. Project management and Under IDA / D1810 Post Direct Selection Direct 25,000.00 17,692.58 2018-06-29 2018-07-20 2018-07-09 2018-05-21 2018-09-12 2019-03-11 TOMPRO à l'Unité Nationale institutional support Implementation de Coordination du Projet BI-PIU-82999-CS-CDS / Formation du personnel du laboratoire national vétérinaire et des 4. Project management and responsables provinciaux IDA / D1810 Post Direct Selection Direct 8,500.00 3,990.00 Completed 2018-12-19 2018-10-30 2019-01-28 2018-11-30 2019-04-03 2019-03-25 2019-09-30 2019-04-04 institutional support d'élevage en bio-sécurité appliquée à la gestion des foyers de la fièvre de la Vallée du Rift BI-PIU-96796-CS-CDS / Convention de collaboration avec l'Institut des Sciences 1. Smallholders’ productivity IDA / D1810 Prior Direct Selection Direct 4,901,413.00 1,345,654.41 Signed 2019-02-19 2019-06-17 2019-03-01 2019-07-16 2019-05-05 2020-10-22 2019-11-01 agronomiques du Burundi and production enhancement (ISABU) dans le domaine de la Recherche-Développement BI-PIU-97439-CS-NPO / Convention de collaboration avec la Société Régionale de 1. Smallholders’ productivity Développement de l'Imbo IDA / D1810 Prior Direct Selection Direct 2,567,463.00 0.00 Canceled 2019-02-19 2019-07-12 2019-03-01 2020-02-12 2019-05-05 2019-11-01 and production enhancement (SRDI) pour l'encadrement des exploitants des périmètres de l'Imbo Centre BI-PIU-97483-CS-CDS / Convention de collaboration avec le Centre National de Technologie Alimentaire 1. Smallholders’ productivity IDA / D1810 Prior Direct Selection Direct 2,466,000.00 95,423.18 Signed 2019-02-25 2019-06-18 2019-03-07 2019-09-09 2019-05-11 2020-12-07 2019-11-07 (CNTA) pour la promotion de and production enhancement de la transformation et l'analyse des produits agro- alimentaires BI-PIU-68409-CS-CDS / Assistance technique IRRI 1. Smallholders’ productivity dans le renforcement des IDA / D1810 Prior Direct Selection Direct 5,653,037.00 5,653,037.00 Signed 2018-11-19 2019-06-14 2018-11-29 2019-09-09 2019-02-02 2020-06-29 2019-08-01 and production enhancement capacités des Institutions Nationales du secteur rizicole. BI-PIU-68081-CS-CDS / Assistance technique l'IITA dans aux institutions de 1. Smallholders’ productivity IDA / D1810 Prior Direct Selection Direct 5,234,185.00 3,784,832.00 Signed 2019-02-25 2019-06-14 2019-03-07 2019-09-06 2019-05-11 2020-06-29 2019-11-07 recherche, de développement and production enhancement et de commercialisation du maïs au Burundi BI-PIU-87427-CS-CDS / Assistance Technique de l'ILRI dans l'amélioration de la 1. Smallholders’ productivity IDA / D1810 Prior Direct Selection Direct 5,196,648.00 3,132,494.00 Signed 2019-02-28 2019-06-17 2019-03-10 2018-01-18 2019-05-14 2020-11-05 2019-11-10 productivité de la filière lait et and production enhancement la commercialisation du lait et des produits laitiers BI-PIU-111611-CS-INDV / Recrutement d'un consultant Individual individuel international 4. Project management and Under IDA / D1810 Post Consultant Open 50,000.00 0.00 2019-04-23 2019-05-21 2019-06-11 2019-09-20 2019-07-02 2019-08-06 2020-02-02 chargé de réaliser la situation institutional support Implementation Selection de référence pour l'évaluation de l'impact du Projet BI-PIU-121522-CS-INDV / Recrutement d'un consultant Individual 4. Project management and Under individuel national pour IDA / D1810 Post Consultant Open 45,000.00 0.00 2019-07-10 2019-07-12 2019-08-28 2019-09-18 2019-10-23 2020-04-20 institutional support Implementation l'étude de la situation de Selection référence de l'impact du Projet BI-PIU-128003-CS-INDV / Etude sur les opportunités et les contraintes de la participation des femmes, des Individual 1. Smallholders’ productivity jeunes et d’autres catégories IDA / D1810 Post Consultant Open 35,000.00 16,198.50 Completed 2019-08-19 2019-08-03 2019-10-07 2020-01-20 2019-10-28 2020-03-11 2019-12-02 2020-04-03 2020-05-30 2020-07-20 and production enhancement vulnérables dans les chaînes Selection de valeur des filières maïs, riz et lait et l’élaboration d’une stratégie genre du projet. Page 6 BI-PIU-128005-CS-INDV / Recrutement d’un consultant Individual 4. Project management and Under chargé de la facilitation IDA / D1810 Post Consultant Limited 2,500.00 0.00 2019-08-19 2019-09-05 2019-08-24 2019-09-14 2019-10-19 2020-04-16 institutional support Implementation /animation d’une retraite du Selection personnel du PRDAIGL. BI-PIU-143909-CS-INDV / Recrutement d’un consultant national chargé de la Individual consolidation des documents 1. Smallholders’ productivity Under IDA / D1810 Post Consultant Open 7,000.00 0.00 2019-11-18 2019-12-17 2020-01-06 2020-01-27 2020-03-02 2020-08-29 et la capitalisation des and production enhancement Implementation Selection expériences pour la formation des Agents Communautaires pour la Santé Animale BI-PIU-143891-CS-CDS / Convention de collaboration avec le Bureau provincial de 1. Smallholders’ productivity IDA / D1810 Post Direct Selection Direct 293,000.00 0.00 Canceled 2019-12-22 2020-01-10 2020-01-01 2020-03-23 2020-03-06 2020-09-02 l’Environnement, de and production enhancement l’Agriculture et de l’Elevage (BPEAE) de Rumonge BI-PIU-143888-CS-CDS / Convention de collaboration avec le Bureau provincial de 1. Smallholders’ productivity IDA / D1810 Post Direct Selection Direct 200,000.00 0.00 Canceled 2019-12-22 2020-01-02 2020-01-01 2020-03-23 2020-03-06 2020-09-02 l’Environnement, de and production enhancement l’Agriculture et de l’Elevage (BPEAE) de Makamba BI-PIU-143609-CS-CDS / Convention de collaboration avec le Bureau provincial de 1. Smallholders’ productivity IDA / D1810 Post Direct Selection Direct 211,000.00 0.00 Canceled 2019-12-22 2020-01-02 2020-01-01 2020-03-23 2020-03-06 2020-09-02 l’Environnement, de and production enhancement l’Agriculture et de l’Elevage (BPEAE) de Bubanza BI-PIU-143616-CS-CDS / Convention de collaboration avec le Bureau provincial de 1. Smallholders’ productivity IDA / D1810 Post Direct Selection Direct 219,000.00 0.00 Canceled 2019-12-22 2020-01-10 2020-01-01 2020-03-23 2020-03-06 2020-09-02 l’Environnement, de and production enhancement l’Agriculture et de l’Elevage (BPEAE) de Bujumbura BI-PIU-143732-CS-CDS / 8. Convention de collaboration avec le Bureau provincial de 1. Smallholders’ productivity IDA / D1810 Post Direct Selection Direct 266,500.00 0.00 Canceled 2019-12-22 2020-01-09 2020-01-01 2020-03-23 2020-03-06 2020-09-02 l’Environnement, de and production enhancement l’Agriculture et de l’Elevage (BPEAE) de Cibitoke BI-PIU-153074-CS-INDV / Individual Traduction du manuel sur la 1. Smallholders’ productivity IDA / D1810 Post Consultant Open 8,000.00 0.00 Canceled 2020-02-03 2020-03-23 2020-04-13 2020-05-18 2020-11-14 méthodologie GALS dans la and production enhancement Selection langue nationale BI-PIU-153088-CS-CDS / Contractualisation de la Chambre Fédérale de Commerce et d’Industrie du 2. Support to investments in Under Burundi (CFCIB) pour assurer IDA / D1810 agro-processing and market Post Direct Selection 33,740.00 0.00 2020-02-03 2020-02-11 2020-02-03 2021-01-13 2020-02-03 2020-02-03 Implementation la sensibilisation pour linkages l’amélioration du climat des affaires dans le domaine agricole BI-PIU-152777-CS-CQS / Individual Elaboration du Plan d'Action 1. Smallholders’ productivity Under IDA / D1810 Post Consultant Open 40,000.00 0.00 2020-02-12 2020-03-03 2020-04-01 2020-07-30 2020-04-22 2020-05-27 2020-11-23 en Faveur des peuples and production enhancement Implementation Selection autochtones Batwa BI-PIU-159386-CS-INDV / Individual Elaboration d'un état des lieux 1. Smallholders’ productivity Under IDA / D1810 Post Consultant Open 10,000.00 0.00 2020-02-20 2020-03-03 2020-04-09 2020-04-30 2020-06-04 2020-12-01 sur la culture et le savoir-faire and production enhancement Implementation Selection des Batwa BI-PIU-198519-CS-INDV / Recrutement d’un consultant Individual national individuel chargé 4. Project management and IDA / D1810 Post Consultant Open 50,000.00 14,764.69 Signed 2020-10-16 2020-10-19 2020-12-04 2020-11-12 2020-12-25 2020-11-16 2021-01-29 2020-11-24 2021-07-28 d’élaborer le rapport institutional support Selection d’avancement du PRDAIGL pour la revue à mi-parcours BI-PIU-201540-CS-INDV / Recructement d'un Consultant Individual 1. Smallholders’ productivity Pending pour la formation des agences IDA / D1810 Post Consultant Open 20,000.00 0.00 2020-12-08 2021-01-26 2021-02-16 2021-03-23 2021-09-19 and production enhancement Implementation d'exécution sur l'approche Selection genre et inclusion sociale BI-PIU-201591-CS-INDV / Recrutement d'un consultant Individual pour l'appui aux institutions, 1. Smallholders’ productivity IDA / D1810 Post Consultant Open 49,500.00 0.00 Canceled 2020-12-04 2021-01-22 2021-02-12 2021-03-19 2021-09-15 structures et organisations and production enhancement Selection partenaires à conduire une auto-analyse genre BI-PIU-211463-CS-INDV / Individual Recrutement d'un consultant 4. Project management and IDA / D1810 Post Consultant Limited 35,000.00 30,801.00 Signed 2020-12-29 2021-01-14 2021-01-03 2021-02-08 2021-01-24 2021-03-30 2021-02-28 2021-04-07 2021-08-27 expérimenté d'appui en institutional support Selection passation des marchés BI-PIU-211905-CS-INDV / Recrutement d'un(e) Individual 4. Project management and Under Informaticien(ne), IDA / D1810 Post Consultant Open 22,000.00 0.00 2021-01-07 2021-01-04 2021-02-25 2021-03-18 2021-04-22 2021-10-19 institutional support Implementation Administrateur (trice) de Selection bases de données du PRDAIGL BI-PIU-212835-CS-INDV / Recrutement de Mr Jery Rambao expert en évaluation Individual 4. Project management and Under d’impact pour l'établissement IDA / D1810 Post Consultant Direct 50,000.00 0.00 2021-01-15 2021-04-27 2021-01-25 2021-05-27 2021-02-15 2021-03-22 2021-09-18 institutional support Implementation de la situation de référence Selection pour l'évaluation de l'impact du PRDAIGL Page 7 BI-PIU-219119-CS-INDV / Recrutement d'un Individual 4. Project management and Under Responsable de IDA / D1810 Post Consultant Open 22,000.00 0.00 2021-02-17 2021-02-20 2021-04-07 2021-04-28 2021-06-02 2021-11-29 institutional support Implementation l'agrobusiness au sein de Selection l'Unité Nationale de Coordination du PRDAIGL BI-PIU-226773-CS-CQS / Recrutement d’un Consultant 3. Institutional integration, chargé de l’élaboration du Individual knowledge acquisition, and Pending Plan Directeur de la Recherche IDA / D1810 Post Consultant Limited 80,000.00 0.00 2021-04-15 2021-04-20 2021-05-11 2021-06-15 2021-12-12 dissemination of information Implementation du Centre National de Selection at the regional level Technologies Agroalimentaires (CNTA) BI-PIU-226775-CS-CQS / Recrutement d’un Consultant chargé de l’évaluation des 3. Institutional integration, Individual besoins des services de knowledge acquisition, and Pending IDA / D1810 Post Consultant Limited 40,000.00 0.00 2021-04-16 2021-04-21 2021-05-12 2021-06-16 2021-12-13 laboratoire de l’ISABU et du dissemination of information Implementation Selection CNTA en fonction des at the regional level priorités des chaines de valeur du maïs, du riz et du lait BI-PIU-226786-CS-INDV / Recrutement de Monsieur Individual 4. Project management and Under NDUHIRUBUSA Jérémie pour IDA / D1810 Post Consultant Direct 33,000.00 0.00 2021-04-12 2021-05-04 2021-04-22 2021-05-28 2021-05-13 2021-06-14 2021-06-17 2021-12-14 institutional support Implementation l’analyse et le suivi des sous- Selection projets BI-PIU-237530-CS-INDV / Recrutement d'un Individual 4. Project management and Under Responsable de la IDA / D1810 Post Consultant Open 17,500.00 0.00 2021-06-08 2021-06-04 2021-07-27 2021-08-17 2021-09-21 2022-03-20 institutional support Implementation Communication au Sein de Selection l'Unité Nationale de Coordination du Projet Page 8 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan[Original: December 2015]: Last Revision of Updated Procurement Plan, Feb 2017] 2. Date of General Procurement Notice: June 25, 2015 3. Period covered by this procurement plan: From December 2015 Till end of December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. NCB (Goods) Above US$ 1,500,000 All 2. Shopping (Goods) Above US$ 500,000 All 2. Pre-qualification. "Not Applicable" 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: "Not applicable" 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan # 8496-EG, Project # P145699 prepared by SSSNP PMU on 6th May 2015 5. Any Other Special Procurement Arrangements: None May 24, 2017 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) (yes/ no) Supply of Computers , laptops, software and other IT 400,00 NCB G-05 equipment 1 No Post 0 (Goods) for MOSS Departmen ts in27 Governorat es Printing & Shoppi G-07 Publication 50,000 1 No Post ng s (Goods) Furniture Shoppi & G-08 Equipment 50,000 1 No Post ng for the (Goods) PMU Video & Shoppi Graphics G-09 equipment 4,000 1 No Post ng for MOSS (Goods) Customer Collaborati on Solution Shoppi G-11 for 45,000 1 No Post ng Grievance (Goods) (call center) III. Selection of Consultants May 24, 2017 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. QCBS (Consulting Firms) Above US$ 500,000 2. IC (Individual Consultant) Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimat Packa Review Comment Assignment ed ges by Bank s Cost (Prior / US$ Post) CF-05 Institutional consultancy to conduct 120,00 airing 1 Post QCBS 0 adverstismen t+Video + radio CF-06 Local community dialogues 50,000 1 Post QCBS regular administratio n CF-08 Communicati on Firm (Advocacy Strategy, 150,00 Communicati 1 Post QCBS 0 on Strategy, Design materials, etc) CF-09 Technical/the 75,000 1 Post QCBS May 24, 2017 matic capacity building (M&E, MIS, grievance, conditionality , social responsibility , NGOs TOT, etc.) IC-30 Hiring Office Manager for 30,000 1 Post IC the Program May 24, 2017 PROCUREMENT Egypt, Arab Republic of : Strengthening Social Safety Net Project PLAN General Information Country: Egypt, Arab Republic of Bank’s Approval Date of the Original Procurement Plan: 2017-05-31 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145699 GPN Date: Project Name: Strengthening Social Safety Net Project Loan / Credit No: IBRD / 84960, IBRD / 89970 Ministry of Social Solidarity Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOSS-11483-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 50,000.00 2,241.79 Completed 2017-07-06 2017-05-05 2017-08-31 2017-05-14 2018-02-27 2017-05-25 Printing and Publications Operational Systems Quotations Envelope EG-MOSS-11486-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Furniture and Equipment for IBRD / 84960 Post Limited 50,000.00 6,323.62 Completed 2017-08-06 2017-07-19 2017-10-01 2017-07-26 2018-03-30 2017-07-29 Operational Systems Quotations Envelope the PMU EG-MOSS-11489-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Video & Graphics Equipment IBRD / 84960 Post Limited 4,000.00 0.00 Canceled 2017-07-07 2017-09-01 2018-02-28 Operational Systems Quotations Envelope for MOSS EG-MOSS-17356-GO-RFQ / Customer Collaboration Solution (grievance) . This solution combines traditional contact center technology and Project Management and Request for Single Stage - One processes with important IBRD / 84960 Post Limited 45,000.00 0.00 Canceled 2017-07-02 2017-07-23 2018-01-19 Monitoring and Evaluation Quotations Envelope additions in recording, agent workspaces, social media and video to help build deeper relationships with our customers EG-MOSS-18410-GO-RFQ / we want to procure 330 scanner so that the grievance system can work through the Moss units in the Project Management and Request for Single Stage - One governorates and no need for IBRD / 84960 Post Limited 70,000.00 0.00 Canceled 2017-07-06 2017-07-04 2017-08-31 2018-02-27 Monitoring and Evaluation Quotations Envelope the appellant to come to the ministry in Cairo, as the appellant usually submit documents with his complaint so we have to scan EG-MOSS-21361-GO-RFQ / Project Management and Request for Single Stage - One Communication equipment's IBRD / 84960 Post Limited 1,500.00 952.01 Completed 2017-08-08 2017-07-30 2017-10-03 2017-08-03 2018-04-01 2017-08-06 Monitoring and Evaluation Quotations Envelope for PMU staff EG-MOSS-23406-GO-RFQ / Under Project Management and Request for Single Stage - One Procuring Tablets for Social IBRD / 84960 Post Limited 95,000.00 49,070.63 Implementati 2017-09-05 2017-08-14 2017-10-31 2017-09-07 2018-04-29 2017-09-14 Monitoring and Evaluation Quotations Envelope Administration on EG-MOSS-23414-GO-RFQ / Project Management and Request for Single Stage - One Procuring Chargers for IBRD / 84960 Post Limited 5,000.00 7,447.63 Completed 2017-08-18 2017-08-21 2017-10-13 2017-09-13 2018-04-11 2017-11-06 Monitoring and Evaluation Quotations Envelope existing tablets EG-MOSS-23481-GO-RFQ / Project Management and Request for Single Stage - One Procuring Office Machinery for IBRD / 84960 Post Limited 1,000.00 0.00 Canceled 2017-09-08 2017-11-03 2018-05-02 Monitoring and Evaluation Quotations Envelope the PMU EG-MOSS-25146-GO-RFQ / Under Designing and Printing of the Project Management and Request for Single Stage - One IBRD / 84960 Post Limited 100,000.00 0.00 Implementati 2017-10-06 2017-08-29 2017-12-01 2018-05-30 Ministry of Social Solidarity Monitoring and Evaluation Quotations Envelope on (MOSS) Promotional Materials EG-MOSS-25158-GO-RFQ / Project Management and Request for Single Stage - One printing business cards for IBRD / 84960 Post Limited 1,200.00 0.00 Canceled 2017-11-06 2018-01-01 2018-06-30 Monitoring and Evaluation Quotations Envelope the PMU EG-MOSS-25161-GO-RFQ / Under Project Management and Request for Single Stage - One Procuring computers for IBRD / 84960 Post Limited 6,000.00 0.00 Implementati 2017-11-06 2017-09-11 2018-01-01 2018-06-30 Monitoring and Evaluation Quotations Envelope Service improvement unit on EG-MOSS-34988-GO-RFQ / Project Management and Request for Single Stage - One Printing 1,500,000 Takaful & IBRD / 84960 Post Limited 45,000.00 7,635.01 Signed 2018-01-06 2017-11-12 2018-03-03 2018-12-28 2018-08-30 Monitoring and Evaluation Quotations Envelope Karama application EG-MOSS-54103-GO-RFQ / Shopping purchase: 5 laptops, 2 PCs, 5 flash memories, 5 Project Management and Request for Single Stage - One antivirus, 4 external hard IBRD / 84960 Post Limited 7,000.00 0.00 Canceled 2018-03-18 2018-04-15 2018-05-06 Monitoring and Evaluation Quotations Envelope disks, 1 camera stand, 1 hand microphone, 1 ear microphones, EG-MOSS-60796-GO-RFQ / Purchase of IT equipment for Under extended PMU staff (10 Project Management and Request for Single Stage - One IBRD / 84960 Post Limited 6,000.00 0.00 Implementati 2018-04-30 2018-05-28 2018-06-25 2018-12-22 laptops + 10 antivirus + 10 Monitoring and Evaluation Quotations Envelope on electricity connector extensions + 5 modems) Page 1 EG-MOSS-68986-GO-RFQ / Professional Conference call, sound system, projectors, Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 50,000.00 28,642.28 Completed 2018-07-29 2018-08-05 2018-08-12 2018-08-29 2018-09-21 2018-09-06 screens and TVs for the Operational Systems Quotations Envelope meeting halls in the ministry (MoSS) head quarter EG-MOSS-70745-GO-RFQ / Purchase 10 photocopier, 20 Support SSN Targeting and Request for Single Stage - One photocopier toners , 65 IBRD / 84960 Post Limited 30,000.00 0.00 Canceled 2018-08-01 2018-08-20 2018-09-19 Operational Systems Quotations Envelope printer toners and 5 inkjet printer. EG-MOSS-66112-GO-RFQ / Purchase Air conditioning, Project Management and Request for Single Stage - One Kitchen electrical devices, IBRD / 84960 Post Limited 15,000.00 4,158.42 Signed 2018-06-23 2018-07-11 2018-07-23 2018-07-30 2018-08-22 Monitoring and Evaluation Quotations Envelope ceiling fans and water cooler tank EG-MOSS-70746-GO-RFQ / Purchase of metal units for Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 40,000.00 316,654.86 Signed 2018-07-29 2018-08-28 2018-09-23 2018-09-10 2018-12-22 2018-09-28 filing - Office furniture - Operational Systems Quotations Envelope Curtains for PMU office. EG-MOSS-71078-GO-RFQ / Purchasing: Printing paper Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 15,000.00 13,499.54 Completed 2018-08-10 2018-09-06 2018-10-05 2018-09-18 2019-04-03 2018-10-16 size (A4 & A3) and stationary Operational Systems Quotations Envelope (e.g: pen, folders ..etc) EG-MOSS-76938-GO-RFQ / Purchasing Racks for the PMU's equipments: Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 4,500.00 0.00 Canceled 2018-09-15 2018-10-11 2018-11-10 1- The main routers in MoSS Operational Systems Quotations Envelope 2- Equipment for discussion systems in MoSS EG-MOSS-78331-GO-RFQ / Providing Compact Stand Kiosk for some social units. Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 60,000.00 29,280.82 Signed 2018-09-25 2018-11-01 2018-11-20 2018-12-20 2019-03-20 Each kiosk will include a tablet Operational Systems Quotations Envelope to receive information from T&K beneficiaries. EG-MOSS-71077-GO-RFQ / Printing T&K's logo on block- Under Support SSN Targeting and Request for Single Stage - One notes, personal cards, pen, IBRD / 84960 Post Limited 90,000.00 0.00 Implementati 2018-07-31 2018-10-23 2018-09-25 2018-11-24 Operational Systems Quotations Envelope bags, paper folders ..etc. on Printing Broshers, pock-let EG-MOSS-81693-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Purchase 2650 electricity IBRD / 84960 Post Limited 80,000.00 0.00 Canceled 2018-11-23 2019-01-02 2019-04-02 Operational Systems Quotations Envelope connectors EG-MOSS-85351-GO-RFQ / Under Purchase web application to Project Management and Request for Single Stage - One IBRD / 84960 Post Limited 90,000.00 0.00 Implementati 2018-11-16 2018-11-18 2018-12-21 2019-03-21 manage TKP depository as Monitoring and Evaluation Quotations Envelope on CMS & LMS. EG-MOSS-85354-GO-RFQ / Project Management and Request for Single Stage - One Purchase network cable & IBRD / 84960 Post Limited 3,000.00 0.00 Canceled 2018-11-13 2018-12-15 2019-01-14 Monitoring and Evaluation Quotations Envelope Mobile phones EG-MOSS-81695-GO-RFB / Lot(A) Supply & install 5100 Thin-clients in social units (Lot B) Supply (1,300) LaserJet Printers Support SSN Targeting and Single Stage - One (Lot C) Supply (2,300) IBRD / 84960 Prior Request for Bids Open - International 7,000,000.00 3,537,297.47 Signed 2018-12-12 2018-12-27 2018-12-20 2019-06-18 2019-02-03 2019-03-03 2019-02-17 2019-06-20 2019-03-10 2019-07-11 2019-07-08 Operational Systems Envelope Scanners (Lot D) Supply (2,650) IP Phones (Lot E) Supply 500 LaserJet Toners for existing printers EG-MOSS-81682-GO-RFQ / Purchase Telephone devices, Support SSN Targeting and Request for Single Stage - One Fax devices, IP-Phones & IBRD / 84960 Post Limited 15,000.00 6,998.58 Completed 2018-10-15 2018-10-16 2018-10-26 2018-10-21 2018-11-25 2018-10-23 Operational Systems Quotations Envelope licenses for IP-Phones for the PIU EG-MOSS-130517-GO-RFQ / Supply and install of networking infrastructure for Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 90,000.00 73,736.13 Signed 2019-09-10 2019-07-24 2019-11-05 2019-08-19 2020-05-03 200 rehabilitation offices of Operational Systems Quotations Envelope the Ministry of Social Solidarity offices. EG-MOSS-132894-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Printings of the Conditionality IBRD / 84960 Post Limited 35,000.00 25,787.70 Completed 2019-09-10 2019-05-23 2019-11-05 2019-05-30 2020-05-03 2019-06-02 Operational Systems Quotations Envelope Registries EG-MOSS-135529-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 10,000.00 6,026.97 Signed 2019-09-29 2019-08-04 2019-11-24 2019-09-15 2020-05-22 Toner cartridges Operational Systems Quotations Envelope EG-MOSS-135562-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Printing Takaful and Karama IBRD / 84960 Post Limited 15,000.00 14,524.10 Signed 2019-09-29 2019-07-15 2019-11-24 2019-08-04 2020-05-22 Operational Systems Quotations Envelope questionnaire . EG-MOSS-121002-GO-RFB / Project Management and Single Stage - One Conditionality Registers and IBRD / 84960 Post Request for Bids Open - National 200,000.00 128,671.06 Completed 2019-06-30 2019-07-02 2019-07-05 2019-08-16 2019-07-10 2019-09-15 2019-07-21 2019-10-20 2019-09-15 2020-04-17 2019-10-01 Monitoring and Evaluation Envelope Booklets BULK Printing EG-MOSS-133550-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 1,000.00 807.30 Completed 2019-09-14 2019-07-21 2019-11-09 2019-07-25 2020-05-07 2019-07-29 Conditionality training guide Operational Systems Quotations Envelope EG-MOSS-144416-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Network Fault & performance IBRD / 84960 Post Limited 90,000.00 90,905.31 Signed 2019-11-12 2019-11-21 2020-01-07 2019-12-19 2020-07-05 Operational Systems Quotations Envelope management system Page 2 EG-MOSS-147022-GO-RFB / Supply of networking switches Support SSN Targeting and Single Stage - One IBRD / 84960 Post Request for Bids Open - National 340,000.00 308,079.66 Signed 2019-12-20 2020-01-19 2019-12-25 2020-02-05 2020-02-16 2020-03-06 2020-04-02 2020-04-10 2020-04-15 2020-10-07 for 344 administrations and Operational Systems Envelope directorates of the MoSS EG-MOSS-35566-GO-RFB / Project Management and Single Stage - One Automation of MOSS social IBRD / 84960 Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2017-11-16 2017-11-21 2018-01-02 2018-02-01 2018-03-08 2018-09-04 Monitoring and Evaluation Envelope units, procuring 4500 tablet EG-MOSS-151897-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Printings of Job evaluation IBRD / 84960 Post Limited 94,000.00 0.00 Canceled 2019-12-31 2020-06-02 2020-02-25 2020-08-23 Operational Systems Quotations Envelope forms EG-MOSS-154634-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 45,000.00 19,377.06 Completed 2020-01-25 2019-12-09 2020-03-21 2020-02-19 2020-09-17 2020-03-01 stationery and office supplies Operational Systems Quotations Envelope EG-MOSS-163926-GO-RFQ / Furniture and air condition for Support SSN Targeting and Request for IBRD / 84960 Post 5,000.00 720.63 Completed 2020-03-10 2020-03-10 2020-03-29 2020-03-10 2020-04-12 Takaful and Karama program Operational Systems Quotations director’s office EG-MOSS-165397-GO-RFQ / Supply and install of flexible anti-fire ducts, network Support SSN Targeting and Request for Single Stage - One cables, electricity power exit IBRD / 84960 Post Limited 9,000.00 0.00 Canceled 2020-03-27 2020-05-22 2020-11-18 Operational Systems Quotations Envelope duct socket for rack, face plates to construct fifty (50) network nodes. EG-MOSS-154659-GO-RFQ / The objective of this procurement activity is to purchase disability Support SSN Targeting and Request for Single Stage - One assessment kits. Some of IBRD / 84960 Post Limited 37,000.00 50,811.43 Completed 2020-01-25 2020-02-09 2020-03-21 2020-02-27 2020-09-17 2020-03-01 Operational Systems Quotations Envelope items that the kits contain are alphabet wooden board, coins, group of cubes, scissors, .. etc. EG-MOSS-165406-GO-RFQ / This activity is to purchase queue system, furniture for the grievance room, supply and install both electricity and Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 95,000.00 117,830.96 Completed 2020-03-28 2020-04-22 2020-05-23 2020-05-10 2020-11-19 2020-07-17 data cables for the queue Operational Systems Quotations Envelope system, and supply and install a partition for the waiting area annexed to the grievance room. Complete lot. EG-MOSS-172044-GO-RFQ / Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 100,000.00 90,000.00 Terminated 2020-05-11 2020-05-07 2020-07-06 2020-05-11 2021-01-02 Database replication server Operational Systems Quotations Envelope EG-MOSS-173387-GO-RFQ / Masks, gloves, alcohol, and Support SSN Targeting and Request for Single Stage - One sterilization materials against IBRD / 84960 Post Limited 9,000.00 10,985.56 Completed 2020-05-22 2020-05-10 2020-07-17 2020-06-17 2021-01-13 2020-06-21 Operational Systems Quotations Envelope Corona Virus for the team work. EG-MOSS-180023-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Laptop computers and IBRD / 84960 Post Limited 50,000.00 25,643.84 Completed 2020-06-30 2020-06-17 2020-08-25 2020-06-22 2021-02-21 2020-06-25 Operational Systems Quotations Envelope photocopiers EG-MOSS-191265-GO-RFQ / Network passive components such as Rj45 Cat6, crimper, Support SSN Targeting and Request for Single Stage - One tester, Box-UTP-Cat6 -305M, IBRD / 84960 Post Limited 13,000.00 6,973.06 Signed 2020-09-11 2020-09-06 2020-11-06 2020-09-24 2021-05-05 Operational Systems Quotations Envelope and unmanaged switch 8 port, for the social administrations’ network. EG-MOSS-191257-GO-RFQ / Furnishing the Information Center of Takaful and Karama Program with chairs, desks, Support SSN Targeting and Request for Single Stage - One smart screen, uniform and ID IBRD / 84960 Post Limited 19,000.00 15,863.49 Signed 2020-09-11 2020-08-16 2020-11-06 2020-09-03 2021-05-05 Operational Systems Quotations Envelope cards for the receptionist team, internal signage, lighting units, data cabling, … etc. EG-MOSS-197489-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Six access control doors IBRD / 84960 Post Limited 10,000.00 7,958.74 Signed 2020-11-03 2020-10-11 2020-12-29 2020-11-02 2021-06-27 Operational Systems Quotations Envelope system. EG-MOSS-197499-GO-RFQ / Number of twenty laptop Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 25,000.00 17,455.36 Completed 2020-11-10 2020-10-12 2021-01-05 2020-10-13 2021-07-04 2020-10-18 computers for Takaful and Operational Systems Quotations Envelope Karama. EG-MOSS-203695-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Supplying Tablets for the IBRD / 84960 Post Limited 100,000.00 94,736.84 Completed 2020-11-17 2021-02-01 2021-01-12 2021-03-30 2021-07-11 2021-04-05 Operational Systems Quotations Envelope social unit. EG-MOSS-204563-GO-RFQ / Pending Support SSN Targeting and Request for Single Stage - One Supply and install air- IBRD / 84960 Post Limited 20,000.00 0.00 Implementati 2020-11-22 2021-01-17 2021-07-16 Operational Systems Quotations Envelope conditions. on EG-MOSS-210972-GO-RFB / Sheets for medical beds for Support SSN Targeting and Single Stage - One the isolation hospitals to IBRD / 84960 Post Request for Bids Open - National 950,000.00 0.00 Canceled 2020-12-27 2021-01-01 2021-02-12 2021-03-14 2021-04-18 2021-10-15 Operational Systems Envelope confront the Corona pandemic. EG-MOSS-211213-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Video conference system for IBRD / 84960 Post Limited 44,000.00 31,814.99 Completed 2021-01-05 2020-12-20 2021-03-02 2020-12-30 2021-08-29 2021-01-03 Operational Systems Quotations Envelope H.E. office. EG-MOSS-211220-GO-RFQ / Under UTP-Cat6 cables and power Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 40,000.00 34,034.42 Implementati 2021-01-04 2021-01-04 2021-03-01 2021-08-28 distribution units PDUs for the Operational Systems Quotations Envelope on social units Page 3 EG-MOSS-212365-GO-RFQ / Purchasing twenty laptops Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 30,000.00 16,332.91 Signed 2021-01-11 2021-01-04 2021-03-08 2021-01-18 2021-09-04 and upgrading four HP Operational Systems Quotations Envelope ProBook 450 G6 laptops. EG-MOSS-225239-GO-RFQ / As a result of the outbreak of the new Corona virus (Covid- 19), cleaning supplies, Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 100,000.00 107,747.45 Completed 2021-03-26 2021-03-24 2021-05-21 2021-04-11 2021-11-17 2021-05-09 disinfectants and masks will Operational Systems Quotations Envelope be provided to a number of 135,000 participants in the behavior change sessions. EG-MOSS-225739-GO-RFQ / Pending Audiovisual equipment for the Support SSN Targeting and Request for Single Stage - One IBRD / 84960 Post Limited 95,000.00 0.00 Implementati 2021-04-02 2021-05-28 2021-11-24 main conference room of the Operational Systems Quotations Envelope on MoSS. EG-MOSS-229514-GO-RFB / Pending Supplying a number of (3,000) Support SSN Targeting and Single Stage - One IBRD / 84960 Post Request for Bids Open - National 940,000.00 0.00 Implementati 2021-04-22 2021-04-27 2021-06-08 2021-07-08 2021-08-12 2022-02-08 Tablet computer for the social Operational Systems Envelope on unit. EG-MOSS-197481-GO-RFQ / Support SSN Targeting and Request for Single Stage - One Printing registration forms for IBRD / 84960 Post Limited 50,000.00 0.00 Canceled 2020-11-03 2020-12-29 2021-06-27 Operational Systems Quotations Envelope Takaful and Karama NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOSS-52515-NC-DIR / MoSS Social Units SDSL land Support SSN Targeting and IBRD / 84960 Prior Direct Selection Direct 2,000,000.00 1,825,150.37 Signed 2018-03-07 2018-03-12 2018-04-16 2018-07-10 2018-10-13 lines connectivity service Operational Systems provision EG-MOSS-76934-NC-RFQ / Printing 2 million Support SSN Targeting and Request for Single Stage - One questionnaire of IBRD / 84960 Post Limited 27,500.00 27,140.36 Signed 2018-09-14 2018-09-10 2018-09-30 2018-09-18 2018-10-20 Operational Systems Quotations Envelope conditionality under Takaful component EG-MOSS-121629-NC-DIR / eFinance's design and printing Support SSN Targeting and IBRD / 84960 Prior Direct Selection Direct 800,000.00 0.00 Canceled 2019-06-30 2019-07-05 2019-08-09 2020-02-05 of 500,000 integrated Operational Systems services acquisition disability cards EG-MOSS-143574-NC-DIR / Support SSN Targeting and IBRD / 84960 Post Direct Selection Direct 2,300.00 0.00 Canceled 2019-10-30 2019-11-04 2019-12-09 2020-06-06 Office boy Operational Systems EG-MOSS-143576-NC-DIR / Support SSN Targeting and IBRD / 84960 Post Direct Selection Direct 3,000.00 0.00 Canceled 2019-10-30 2019-11-04 2019-12-09 2020-06-06 Office boy Operational Systems EG-MOSS-40100-NC-DIR / Video shooting, due to satisfactory performance of a supplier that was selected Project Management and through shopping package, IBRD / 84960 Post Direct Selection Direct 2,500.00 0.00 Canceled 2017-12-31 2018-01-05 2018-02-09 2018-08-08 Monitoring and Evaluation we want to make a short documentary about Karama's system before and after the reform we had made EG-MOSS-85355-NC-RFQ / Project Management and Request for Single Stage - One Maintenance Service for PIU's IBRD / 84960 Post Limited 2,500.00 0.00 Canceled 2018-11-16 2018-12-16 2019-11-30 Monitoring and Evaluation Quotations Envelope air conditions EG-MOSS-73859-NC-RFQ / Support SSN Targeting and Request for Single Stage - One Providing production services IBRD / 84960 Post Limited 50,000.00 0.00 Canceled 2018-08-19 2018-09-28 2019-08-01 Operational Systems Quotations Envelope for short films/movies. EG-MOSS-78329-NC-DIR / Support SSN Targeting and Providing MoSS's PIU with PRI IBRD / 84960 Post Direct Selection Direct 10,000.00 0.00 Canceled 2018-09-18 2018-09-23 2018-10-28 2019-11-30 Operational Systems service EG-MOSS-34835-NC-RFQ / Developing Video Disc (15 minutes) of the conditionality Project Management and IBRD / 84960 Post Direct Selection Direct 5,000.00 0.00 Canceled 2017-12-03 2017-12-08 2018-01-12 2018-07-11 process for insliting potential Monitoring and Evaluation beneficiaries into and out of the program EG-MOSS-225309-NC-RFQ / The non-consulting service required is having short mobile messages sent via operator networks, with Support SSN Targeting and Request for Single Stage - One associated cost for each SMS IBRD / 84960 Post Limited 100,000.00 50,495.36 Signed 2021-03-26 2021-03-01 2021-05-21 2021-04-06 2021-11-17 Operational Systems Quotations Envelope passing through operator network. No technical consultation or expertise is requested, only using operator infrastructure. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOSS-11508-CS-QCBS / Communication Firm Support SSN Targeting and Quality And Cost- Under (Advocacy Strategy, IBRD / 84960 Post Open - National 150,000.00 0.00 2017-12-03 2017-08-15 2017-12-24 2018-02-06 2017-11-13 2018-03-06 2018-04-05 2018-05-10 2018-06-14 2019-06-14 Operational Systems Based Selection Implementation Communication Strategy, Design Materials etc.) Page 4 EG-MOSS-24306-CS-QCBS / Awareness campaign on "Rights of People with Project Management and Quality And Cost- IBRD / 84960 Post Open - National 230,000.00 256,593.35 Signed 2017-10-01 2017-08-20 2017-10-22 2017-12-05 2017-11-10 2018-01-02 2017-12-28 2018-02-01 2018-01-28 2018-03-08 2018-02-19 2018-04-12 2018-11-04 2019-04-12 Disability" (PwD) Monitoring and Evaluation Based Selection In Social Protection and Inclusion EG-MOSS-11506-CS-QCBS / Consultant Project Management and Local Community Dialogues IBRD / 84960 Post Qualification Open - National 50,000.00 0.00 Canceled 2017-11-01 2017-11-22 2018-01-05 2018-02-02 2018-03-04 2018-04-08 2018-05-13 2019-05-13 Monitoring and Evaluation Regular Administration Selection EG-MOSS-11503-CS-QCBS / Institutional Consultancy to Support SSN Targeting and Quality And Cost- IBRD / 84960 Post Open - National 120,000.00 0.00 Canceled 2017-09-03 2017-09-24 2017-11-07 2017-12-05 2018-01-04 2018-02-08 2018-03-15 2019-03-15 conduct Airing, Operational Systems Based Selection Advertisement, Video, Radio EG-MOSS-46782-CS-QCBS / Institutional capacity building Project Management and Quality And Cost- campaign for building IBRD / 84960 Post Open - National 80,000.00 0.00 Canceled 2018-01-30 2018-02-20 2018-07-08 2018-04-05 2018-05-03 2018-06-02 2018-07-07 2018-08-11 2019-08-11 Monitoring and Evaluation Based Selection capacities on "Takaful" conditionality EG-MOSS-11509-CS-QCBS / Technical / Thematic capacity Support SSN Targeting and Quality And Cost- building (M&E, MIS, Grievance, IBRD / 84960 Post Open - National 75,000.00 0.00 Canceled 2018-01-01 2018-01-22 2018-03-07 2018-04-04 2018-05-04 2018-06-08 2018-07-13 2019-07-13 Operational Systems Based Selection Conditionality, Social responsibility, NGOs TOT, etc) EG-MOSS-165374-CS-CQS / Conducting a Rapid Market Consultant Support SSN Targeting and Assessment for the “FORSA” IBRD / 89970 Post Qualification Open - National 6,500.00 0.00 Canceled 2020-03-24 2020-03-23 2020-04-14 2020-05-28 2020-06-27 2020-08-01 2021-01-28 Operational Systems Economic Empowerment Selection Program in Egypt EG-MOSS-165280-CS-CQS / Capacity building and training for the Master Trainers, a Consultant trainer for each governorate, Support SSN Targeting and IBRD / 89970 Post Qualification Open - National 60,000.00 163,307.79 Signed 2020-03-19 2020-03-29 2020-04-09 2020-05-08 2020-05-23 2020-10-12 2020-06-20 2021-01-03 2020-07-11 2021-01-03 2020-08-15 2021-01-03 2020-09-19 2021-03-08 2021-04-22 who will accordingly train the Operational Systems Selection targeted T&K enrolled candidates in each governorate. EG-MOSS-177408-CS-CQS / Performance Audit. The objective of the performance audit of the Eligible Expenditure Program (EEP) is Consultant Support SSN Targeting and to ascertain whether IBRD / 84960 Post Qualification Open - National 40,000.00 29,439.72 Signed 2020-06-02 2020-05-03 2020-06-23 2020-08-06 2020-05-10 2020-09-05 2020-05-25 2020-10-10 2020-06-04 2021-04-08 Operational Systems payments made under the EEP Selection are reaching eligible beneficiaries and to provide advice regarding the oversight and control framework EG-MOSS-221513-CS-CQS / Providing services for the annual advertising and Consultant promotional campaign for the Support SSN Targeting and Pending IBRD / 84960 Post Qualification Open - National 100,000.00 0.00 2021-02-24 2021-03-17 2021-04-30 2021-05-30 2021-07-04 2021-12-31 mechanisms and programs of Operational Systems Implementation Selection the Ministry of Social Solidarity through various social media platforms. EG-MOSS-235383-CS-QCBS / Hiring a System Integrator firm to design, development and operationalization of an integrated MIS platform. Also, Support SSN Targeting and Quality And Cost- Under to design, build, implement IBRD / 84960 Post Open - International 700,000.00 0.00 2021-05-27 2021-05-24 2021-06-07 2021-05-25 2021-07-08 2021-08-22 2021-09-02 2021-10-07 2021-10-28 2024-08-31 Operational Systems Based Selection Implementation data sharing mechanism for its integration among the relevant systems/modules and provide end users training. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual EG-MOSS-13931-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 30,000.00 0.00 Canceled 2017-07-31 2017-08-05 2017-08-26 2017-09-30 2018-03-29 PMU Office Manager Monitoring and Evaluation Selection EG-MOSS-58973-CS-INDV / Individual Project Management and Hiring Disability Advisor (ToR IBRD / 84960 Post Consultant Limited 20,000.00 4,164.58 Signed 2018-04-12 2018-03-14 2018-04-17 2019-01-15 2018-05-08 2019-01-23 2018-06-12 2019-02-01 2018-12-09 Monitoring and Evaluation attached) Selection EG-MOSS-58991-CS-INDV / Individual Project Management and Hiring Disability Operations IBRD / 84960 Post Consultant Limited 7,000.00 7,076.35 Signed 2018-04-12 2018-03-11 2018-04-17 2018-03-21 2018-05-08 2018-03-26 2018-06-12 2018-04-10 2018-12-09 Monitoring and Evaluation Officer Selection EG-MOSS-58992-CS-INDV / Individual Project Management and Hiring Disability Capacity IBRD / 84960 Post Consultant Limited 7,500.00 7,448.79 Signed 2018-04-12 2018-03-11 2018-04-17 2018-03-28 2018-05-08 2018-04-19 2018-06-12 2018-05-02 2018-12-09 Monitoring and Evaluation Development Officer Selection Individual EG-MOSS-58993-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 24,000.00 18,622.35 Signed 2018-04-12 2018-03-05 2018-04-17 2018-09-12 2018-05-08 2018-09-20 2018-06-12 2018-10-01 2018-12-09 Hiring M&E Specialist Monitoring and Evaluation Selection EG-MOSS-58995-CS-INDV / Individual Project Management and Hiring Monitoring IBRD / 84960 Post Consultant Limited 8,000.00 8,317.82 Signed 2018-04-12 2018-03-15 2018-04-17 2018-03-19 2018-05-08 2018-03-25 2018-06-12 2018-04-01 2018-12-09 Monitoring and Evaluation Coordinators Selection EG-MOSS-59002-CS-INDV / Individual Project Management and Hiring Radio Episodes IBRD / 84960 Post Consultant Limited 5,500.00 9,310.99 Signed 2018-04-12 2018-03-21 2018-04-17 2018-03-28 2018-05-08 2018-04-11 2018-06-12 2018-04-17 2018-12-09 Monitoring and Evaluation Composer/Producer Selection Page 5 Individual EG-MOSS-70742-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 10,000.00 4,840.21 Signed 2018-07-24 2018-06-25 2018-07-26 2018-06-26 2018-07-27 2018-06-27 2018-07-30 2018-07-01 2019-07-30 Photographer Monitoring and Evaluation Selection EG-MOSS-70743-CS-INDV / Individual Project Management and Conditionality Capacity IBRD / 84960 Post Consultant Limited 8,000.00 10,366.23 Signed 2018-07-26 2018-06-24 2018-07-28 2018-07-26 2018-07-29 2018-07-29 2018-07-31 2018-08-01 2019-01-27 Monitoring and Evaluation Building Expert Selection EG-MOSS-76654-CS-INDV / Individual Project Management and Hiring Regulatory & IBRD / 84960 Post Consultant Limited 28,500.00 31,036.63 Signed 2018-09-02 2018-08-21 2018-09-07 2018-08-26 2018-09-12 2018-08-30 2018-09-20 2018-09-04 2019-07-17 Monitoring and Evaluation Governance Consultant Selection EG-MOSS-76655-CS-INDV / Individual Support SSN Targeting and Hiring MIS Database IBRD / 84960 Post Consultant Limited 16,000.00 0.00 Under Review 2018-09-02 2018-08-19 2018-09-07 2018-09-12 2018-09-22 2019-06-30 Operational Systems Administrator Selection Individual EG-MOSS-76656-CS-INDV / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 23,000.00 6,229.37 Signed 2018-09-03 2018-08-09 2018-09-08 2018-10-01 2018-09-14 2018-10-16 2018-09-23 2018-11-01 2019-06-30 Hiring MIS Business Analyst Operational Systems Selection Individual EG-MOSS-76657-CS-INDV / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 24,500.00 29,041.27 Signed 2018-09-03 2018-08-14 2018-09-08 2018-08-22 2018-09-13 2018-08-28 2018-09-19 2018-09-09 2019-06-26 Hiring MIS TA Team Leader Operational Systems Selection Individual EG-MOSS-76658-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 17,000.00 18,265.05 Signed 2018-09-02 2018-08-09 2018-09-07 2018-08-13 2018-09-10 2018-08-23 2018-09-17 2018-09-09 2019-06-30 Hiring MIS consultant Monitoring and Evaluation Selection Individual EG-MOSS-76660-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 11,000.00 10,621.42 Signed 2018-09-05 2018-08-13 2018-09-10 2018-08-26 2018-09-15 2018-08-29 2018-09-21 2018-09-09 2019-06-30 Hiring IT specialist Monitoring and Evaluation Selection Individual EG-MOSS-76688-CS-INDV / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 7,000.00 8,687.56 Signed 2018-09-03 2018-08-16 2018-09-08 2018-08-21 2018-09-11 2018-08-26 2018-09-18 2018-09-04 2018-10-18 Hiring ESMF Consultant Operational Systems Selection EG-MOSS-76935-CS-INDV / Hiring Bulk Data Entry Individual Consultants. Multiple Support SSN Targeting and IBRD / 84960 Post Consultant Limited 28,000.00 3,099.81 Signed 2018-09-06 2018-08-15 2018-09-26 2018-08-22 2018-10-01 2018-08-27 2018-10-18 2018-09-10 2019-05-16 consultants are expected to Operational Systems Selection be hired to perform such huge task. EG-MOSS-76937-CS-INDV / Individual Support SSN Targeting and Hiring MIS Software IBRD / 84960 Post Consultant Limited 13,500.00 0.00 Canceled 2018-09-05 2018-08-20 2018-09-10 2018-09-15 2018-09-30 2019-06-30 Operational Systems Development Consultant Selection Individual EG-MOSS-81681-CS-INDV / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 23,000.00 0.00 Canceled 2018-10-11 2018-10-15 2018-10-16 2018-10-19 2018-10-24 2019-10-31 Hire GIS Consultant in the PIU Operational Systems Selection EG-MOSS-85352-CS-INDV / Individual Project Management and Hiring Advisor for Community IBRD / 84960 Post Consultant Limited 23,000.00 5,795.16 Signed 2018-11-01 2018-10-08 2018-11-06 2018-10-17 2018-11-11 2018-10-24 2018-11-21 2018-11-01 2019-10-31 Monitoring and Evaluation Affairs Selection EG-MOSS-95771-CS-INDV / Individual Hiring Civil Society Project Management and IBRD / 84960 Post Consultant Limited 22,000.00 25,026.62 Signed 2019-01-22 2018-12-03 2019-01-27 2018-12-23 2019-01-29 2018-12-25 2019-02-01 2019-01-01 2019-11-30 Organizations Coordinator in Monitoring and Evaluation Selection PIU EG-MOSS-95772-CS-INDV / Individual Hiring Strategy and Capacity Project Management and IBRD / 84960 Post Consultant Limited 22,000.00 25,026.62 Signed 2019-01-22 2018-12-18 2019-01-27 2018-12-20 2019-01-29 2018-12-23 2019-02-01 2019-01-01 2019-11-30 Development Coordinator in Monitoring and Evaluation Selection PIU EG-MOSS-95773-CS-INDV / Individual Project Management and Hiring Gender Outreach IBRD / 84960 Post Consultant Limited 22,000.00 25,034.39 Signed 2019-01-22 2018-12-16 2019-01-27 2018-12-12 2019-01-29 2018-12-24 2019-02-01 2019-01-01 2019-11-30 Monitoring and Evaluation Advisor Selection EG-MOSS-95774-CS-INDV / Individual Project Management and Hiring Senior Program IBRD / 84960 Post Consultant Limited 11,000.00 11,380.08 Signed 2019-01-22 2018-12-03 2019-01-27 2018-12-13 2019-01-29 2018-12-20 2019-02-01 2019-01-01 2019-11-30 Monitoring and Evaluation Assistant in PIU Selection EG-MOSS-85353-CS-INDV / Individual Project Management and Hiring Procurement Assistant IBRD / 84960 Post Consultant Limited 11,500.00 0.00 Canceled 2018-11-08 2018-11-13 2018-11-28 2018-12-08 2019-11-30 Monitoring and Evaluation (Jr procurement specialist) Selection EG-MOSS-117748-CS-INDV Individual Project Management and / Program Legal Advisor (6 IBRD / 84960 Post Consultant Limited 8,000.00 7,446.48 Signed 2019-06-01 2019-05-30 2019-06-06 2019-05-24 2019-06-27 2019-05-27 2019-08-01 2019-06-03 2020-01-28 Monitoring and Evaluation month agreement) Selection Individual EG-MOSS-117819-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,500.00 1,514.50 Signed 2019-06-03 2019-05-30 2019-06-08 2019-05-02 2019-06-29 2019-05-19 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (1) Monitoring and Evaluation Selection Individual EG-MOSS-117825-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,000.00 1,364.95 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-06-23 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (2) Monitoring and Evaluation Selection Individual EG-MOSS-117826-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,000.00 934.22 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-05-20 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (3) Monitoring and Evaluation Selection Individual EG-MOSS-117827-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 1,500.00 1,442.53 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-05-23 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (4) Monitoring and Evaluation Selection Individual EG-MOSS-117828-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,500.00 659.47 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-05-21 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (5) Monitoring and Evaluation Selection Individual EG-MOSS-117830-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 2,000.00 351.72 Signed 2019-06-03 2019-05-02 2019-06-08 2019-05-02 2019-06-29 2019-05-23 2019-08-03 2019-06-03 2020-01-30 / Translator/Interpreter (6) Monitoring and Evaluation Selection Page 6 Individual EG-MOSS-119697-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 16,000.00 6,884.14 Signed 2019-06-19 2019-06-23 2019-06-24 2019-06-02 2019-07-15 2019-06-18 2019-08-19 2019-07-01 2020-02-15 / Call Center Specialist Monitoring and Evaluation Selection Individual EG-MOSS-70741-CS-INDV / Project Management and IBRD / 84960 Post Consultant Limited 12,000.00 11,421.48 Signed 2018-07-24 2018-07-24 2018-07-26 2018-07-26 2018-07-27 2018-07-29 2018-07-31 2018-08-01 2019-07-31 Senior Multimedia Specialist Monitoring and Evaluation Selection Individual EG-MOSS-128015-CS-INDV Project Management and IBRD / 84960 Post Consultant Limited 10,000.00 0.00 Canceled 2019-08-19 2019-08-19 2019-08-24 2019-09-14 2019-10-19 2020-04-16 / Call Center Specialist Monitoring and Evaluation Selection Individual EG-MOSS-135023-CS-CQS / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 10,000.00 10,276.20 Signed 2019-09-23 2019-07-15 2019-09-28 2019-07-11 2019-10-19 2019-07-16 2019-11-23 2019-07-22 2020-05-21 Disability Advisor Operational Systems Selection Individual EG-MOSS-141172-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 1,000.00 5,797.64 Signed 2019-10-01 2019-10-01 2019-10-06 2019-09-15 2019-10-27 2019-09-22 2019-12-01 2019-10-01 2020-05-29 / Administrative Assistant Operational Systems Selection Individual EG-MOSS-141576-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 5,000.00 24,821.60 Signed 2019-09-15 2019-09-15 2019-09-20 2019-09-17 2019-10-11 2019-09-19 2019-11-15 2019-10-01 2020-05-13 / Disability Officer Operational Systems Selection EG-MOSS-141559-CS-INDV Individual / The Consultant shall Support SSN Targeting and IBRD / 84960 Post Consultant Limited 3,400.00 3,447.41 Signed 2019-09-15 2019-08-08 2019-09-20 2019-08-15 2019-10-11 2019-08-28 2019-11-15 2019-09-15 2020-05-13 perform the Services as Social Operational Systems Selection Protection Officer. Individual EG-MOSS-141185-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 15,000.00 14,089.14 Signed 2019-10-01 2019-10-01 2019-10-06 2019-10-03 2019-10-27 2019-10-06 2019-12-01 2019-10-15 2020-05-29 / Monitoring Coordinator Operational Systems Selection Individual EG-MOSS-143552-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 2,700.00 2,325.73 Signed 2019-10-30 2019-09-12 2019-11-04 2019-09-17 2019-11-25 2019-09-22 2019-12-30 2019-10-01 2020-06-27 / Administrative Assistant Operational Systems Selection Individual EG-MOSS-143561-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 5,000.00 4,153.43 Signed 2019-10-30 2019-09-10 2019-11-04 2019-09-17 2019-11-25 2019-09-24 2019-12-30 2019-10-01 2020-06-27 / Administrative Assistant Operational Systems Selection Individual EG-MOSS-143566-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 5,000.00 4,580.45 Signed 2019-10-30 2019-10-30 2019-11-04 2019-10-22 2019-11-25 2019-10-27 2019-12-30 2019-11-01 2020-06-27 / Administrative Assistant Operational Systems Selection Individual EG-MOSS-143579-CS-INDV Support SSN Targeting and Pending IBRD / 84960 Post Consultant Limited 30,000.00 0.00 2019-11-25 2019-12-25 / Field Operation Manager Operational Systems Implementation Selection Individual EG-MOSS-143589-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 34,000.00 30,813.99 Signed 2019-10-30 2019-10-15 2019-11-04 2019-10-17 2019-11-25 2019-10-22 2019-12-30 2019-11-01 2020-06-27 / GIS Consultant Operational Systems Selection Individual EG-MOSS-143591-CS-INDV Support SSN Targeting and IBRD / 84960 Post Consultant Limited 30,000.00 29,981.26 Signed 2019-10-30 2019-10-15 2019-11-04 2019-10-01 2019-11-25 2019-10-27 2019-12-30 2019-11-01 2020-06-27 / Senior researcher Operational Systems Selection EG-MOSS-147248-CS-INDV Individual Support SSN Targeting and / Monitoring & Evaluation and IBRD / 84960 Post Consultant Limited 40,000.00 42,221.15 Signed 2019-11-26 2019-11-25 2019-12-01 2019-11-24 2019-12-22 2019-12-01 2020-01-26 2019-12-15 2020-07-24 Operational Systems Research Advisor Selection EG-MOSS-147260-CS-INDV Individual Support SSN Targeting and / Health Conditionality IBRD / 84960 Post Consultant Limited 40,000.00 25,332.99 Signed 2019-11-26 2019-11-25 2019-12-01 2019-12-01 2019-12-22 2019-12-08 2020-01-26 2019-12-15 2020-07-24 Operational Systems Advisor Selection EG-MOSS-118096-CS-CDS / Provision of integrated social Project Management and protection services to enhance IBRD / 84960 Post Direct Selection Direct 200,000.00 0.00 Canceled 2019-06-04 2019-06-04 2019-06-14 2019-08-18 2020-02-14 Monitoring and Evaluation "Takaful and Karama" program among local communities EG-MOSS-151080-CS-INDV Individual Support SSN Targeting and / Education Conditionality IBRD / 84960 Post Consultant Limited 23,000.00 22,486.65 Signed 2019-12-18 2019-11-28 2019-12-23 2019-12-01 2020-01-13 2019-12-12 2020-02-17 2019-12-19 2020-08-15 Operational Systems Advisor Selection EG-MOSS-169705-CS-INDV Individual Support SSN Targeting and / Self-Employment and IBRD / 84960 Post Consultant Limited 42,000.00 42,116.23 Signed 2020-04-21 2020-05-01 2020-04-26 2020-04-19 2020-05-17 2020-04-26 2020-06-21 2020-05-01 2020-12-18 Operational Systems Livelihoods Manager Selection EG-MOSS-190238-CS-CDS / The objective of the financial audit service is to enable the auditor to express a single professional opinion on the Support SSN Targeting and IBRD / 84960 Post Direct Selection Direct 55,000.00 55,946.72 Signed 2020-08-25 2020-08-23 2020-09-04 2020-09-01 2020-11-08 2020-09-15 2021-05-07 financial position of the Operational Systems project at the end of each fiscal year, and on funds received and expenditures for a relevant accounting period Individual EG-MOSS-193761-CS-CQS / Support SSN Targeting and IBRD / 89970 Post Consultant Limited 15,000.00 13,775.51 Signed 2020-09-24 2020-09-21 2020-09-29 2020-11-10 2020-10-20 2020-11-15 2020-11-24 2020-11-25 2021-05-23 Program officer. Operational Systems Selection EG-MOSS-193762-CS-CQS / Individual Support SSN Targeting and Monitoring, Evaluation and IBRD / 89970 Post Consultant Limited 27,000.00 11,483.25 Signed 2020-09-24 2020-09-21 2020-09-29 2020-10-14 2020-10-20 2020-10-19 2020-11-24 2020-11-01 2021-05-23 Operational Systems Data Management Specialist. Selection Individual EG-MOSS-193766-CS-CQS / Support SSN Targeting and Under IBRD / 89970 Post Consultant Limited 12,000.00 0.00 2020-09-24 2020-09-21 2020-09-29 2020-10-20 2020-11-24 2021-05-23 Governorate Field Coordinator Operational Systems Implementation Selection Individual EG-MOSS-194034-CS-CQS / Support SSN Targeting and IBRD / 89970 Post Consultant Limited 27,000.00 22,959.18 Signed 2020-09-24 2020-09-21 2020-09-29 2020-10-14 2020-10-20 2020-10-18 2020-11-24 2020-11-01 2021-05-23 Senior employment officer. Operational Systems Selection Page 7 EG-MOSS-194311-CS-CQS / Individual Support SSN Targeting and Self-Employment and IBRD / 89970 Post Consultant Limited 27,000.00 26,768.64 Signed 2020-09-24 2020-09-21 2020-09-29 2020-12-15 2020-10-20 2020-12-20 2020-11-24 2021-01-01 2021-05-23 Operational Systems Livelihoods Senior Officer. Selection Individual EG-MOSS-194319-CS-CQS / Support SSN Targeting and IBRD / 89970 Post Consultant Limited 15,000.00 13,014.35 Signed 2020-09-24 2020-09-21 2020-09-29 2020-09-30 2020-10-20 2020-10-07 2020-11-24 2020-10-20 2021-05-23 Agribusiness officer. Operational Systems Selection Individual EG-MOSS-194329-CS-CQS / Support SSN Targeting and Under IBRD / 89970 Post Consultant Limited 38,000.00 0.00 2020-09-24 2020-09-21 2020-09-29 2020-10-20 2020-11-24 2021-05-23 wage employment manager. Operational Systems Implementation Selection Individual EG-MOSS-194348-CS-CQS / Support SSN Targeting and IBRD / 89970 Post Consultant Limited 23,000.00 20,676.45 Signed 2020-09-24 2020-09-21 2020-09-29 2020-09-28 2020-10-20 2020-10-01 2020-11-24 2020-10-15 2021-05-23 FORSA coordinator. Operational Systems Selection Individual EG-MOSS-194417-CS-CQS / Support SSN Targeting and Under IBRD / 89970 Post Consultant Limited 19,000.00 0.00 2020-09-24 2020-09-21 2020-09-29 2020-10-20 2020-11-24 2021-05-23 advocacy coordinator. Operational Systems Implementation Selection Individual EG-MOSS-215456-CS-CQS / Support SSN Targeting and IBRD / 84960 Post Consultant Limited 8,000.00 6,130.27 Signed 2021-01-25 2021-01-05 2021-01-30 2021-01-20 2021-02-20 2021-01-25 2021-03-27 2021-02-03 2021-09-23 M&E assistant Operational Systems Selection EG-MOSS-225235-CS-INDV / Financial manager that will prepare and extract regular Individual Support SSN Targeting and Under financial reports to assist IBRD / 84960 Post Consultant Limited 27,000.00 0.00 2021-03-17 2021-02-09 2021-03-22 2021-04-12 2021-05-17 2021-11-13 Operational Systems Implementation FORSA Program Director in Selection making decisions that affect the program. EG-MOSS-235090-CS-INDV / M & E Senior Advisor for 10 Individual Support SSN Targeting and Under days to provide technical IBRD / 84960 Post Consultant Limited 1,000.00 0.00 2021-05-23 2021-05-16 2021-05-28 2021-06-18 2021-07-23 2022-01-19 Operational Systems Implementation assistance to the FORSA Selection program. EG-MOSS-235353-CS-INDV Individual Support SSN Targeting and Under / Agribusiness & livestock IBRD / 84960 Post Consultant Limited 4,000.00 0.00 2021-05-23 2021-05-16 2021-05-28 2021-06-18 2021-07-23 2022-01-19 Operational Systems Implementation advisor. Selection Page 8 PROCUREMENT PLAN (Textual Part) Project information: West Bank and Gaza, PFM Improvement, P-162850 Project Implementation agency: MINISTRY OF FINANCE AND PLANNING Date of the Procurement Plan: 10 July 2018 Period covered by this Procurement Plan: First 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). “Not Applicable” PROCUREMENT West Bank and Gaza : Public Financial Management Improvement Project PLAN General Information Country: West Bank and Gaza Bank’s Approval Date of the Original Procurement Plan: 2018-07-11 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162850 GPN Date: 2018-07-17 Project Name: Public Financial Management Improvement Project Loan / Credit No: TF / A6949, / P Executing Agency(ies): alestinian Authority-Ministry of Finance and Planning WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Project GZ-MOFP-114614-GO-RFQ / Request for Single Stage - One TF / A6949 Implementation Support and Post Limited 90,000.00 78,364.00 Completed 2019-10-29 2019-11-25 2019-12-24 2020-01-09 2020-06-21 2020-02-13 PMU and MOFP Equipment Quotations Envelope Management Costs GZ-MOFP-177544-GO-RFQ / Component 2: Improving Request for Single Stage - One Equipment for the benefit of TF / A6949 Financial Accountability of Post Limited 90,000.00 59,658.00 Completed 2020-06-12 2020-06-15 2020-08-07 2020-08-09 2020-10-06 2020-09-22 Quotations Envelope SAACB. the PFM System Component 1: Improving GZ-MOFP-198841-GO-RFQ / Request for Single Stage - One TF / A6949 Budget Expenditure Post Limited 35,000.00 35,484.00 Signed 2020-11-13 2020-11-08 2021-01-08 2020-12-20 2021-03-09 Office and IT Equipment Quotations Envelope Management and Control GZ-MOFP-213643-GO-RFQ / Component 2: Improving Pending Request for Single Stage - One Office equipment/software for TF / A6949 Financial Accountability of Post Limited 58,000.00 0.00 Implementati 2021-04-04 2021-05-30 2021-08-08 Quotations Envelope the benefit of SAACB the PFM System on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-MOFP-88245-CS-QCBS / Component 4: Project Quality And Cost- Hiring an external auditor to TF / A6949 Implementation Support and Post Open - National 15,000.00 6,612.00 Signed 2018-11-26 2018-11-26 2018-11-26 2018-11-26 2018-11-26 2019-01-06 2019-01-06 2019-01-16 2019-01-06 2019-01-24 2019-01-06 2019-02-21 2019-04-15 2021-06-15 Based Selection audit the PFMI project Management Costs GZ-MOFP-114617-CS-QCBS Component 1: Improving Consultant / Modernize the Functions of TF / A6949 Budget Expenditure Post Qualification Limited 50,000.00 88,879.20 Signed 2019-08-08 2019-08-21 2019-08-22 2019-09-08 2019-09-21 2019-10-16 2019-10-26 2019-12-26 2020-04-23 Financial Controller Management and Control Selection GZ-MOFP-158890-CS-QCBS / Consultantancy firm to work Component 1: Improving on the Israeli deduction from Quality And Cost- TF / A6949 Budget Expenditure Post Open - National 130,000.00 0.00 Canceled 2020-02-16 2020-02-16 2020-03-08 2020-04-21 2020-05-19 2020-06-18 2020-07-23 2020-08-27 2021-08-27 Clearance Revenues Based Selection Management and Control transferred to the Palestinian Government. Component 1: Improving GZ-MOFP-215235-CS-QCBS Quality And Cost- TF / A6949 Budget Expenditure Post Open - National 55,000.00 0.00 Canceled 2021-02-28 2021-04-01 2021-03-21 2021-05-04 2021-06-01 2021-07-01 2021-08-05 2021-09-09 2022-09-09 / Recruiting an IT Audit Firm Based Selection Management and Control GZ-MOFP-239377-CS-CQS / Component 1: Improving Consultant Advisory Support for the Audit TF / A6949 Budget Expenditure Post Qualification Limited 80,000.00 0.00 Under Review 2021-06-20 2021-05-20 2021-07-04 2021-08-03 2021-09-07 2022-03-06 of BISAN System (FMIS) at Management and Control Selection Ministry of Finance INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-MOFP-68910-CS-INDV / Component 4: Project Individual PMU Financial Management TF / A6949 Implementation Support and Post Consultant Direct 33,600.00 33,600.00 Completed 2018-07-10 2018-07-12 2018-07-10 2018-06-07 2018-07-10 2018-06-10 2018-07-10 2018-07-01 2019-07-09 2019-06-30 Specialist Management Costs Selection Component 4: Project Individual GZ-MOFP-68920-CS-INDV / TF / A6949 Implementation Support and Post Consultant Open 48,000.00 4,000.00 Completed 2018-07-10 2018-07-12 2018-08-13 2018-09-17 2018-08-18 2018-12-20 2018-09-01 2019-02-03 2019-08-31 2020-02-02 PMU Manager Management Costs Selection Component 4: Project Individual GZ-MOFP-68927-CS-INDV / TF / A6949 Implementation Support and Post Consultant Open 33,600.00 34,800.00 Completed 2018-07-10 2018-07-12 2018-08-13 2018-09-17 2018-08-18 2018-09-30 2018-09-01 2018-11-01 2019-08-31 2019-10-31 PMU Procurement Specialist Management Costs Selection GZ-MOFP-111771-CS-CDS / Component 2: Improving Individual Financial Expert to Reduce the TF / A6949 Financial Accountability of Post Consultant Direct 64,000.00 64,000.00 Completed 2019-04-29 2019-04-29 2019-04-29 2019-04-29 2019-04-29 2019-04-29 2019-05-01 2019-05-01 2019-12-31 2019-12-31 Backlog of Financial the PFM System Selection Statements of the PA Page 1 GZ-MOFP-69928-CS-CDS / Component 1: Improving Business process analyst for TF / A6949 Budget Expenditure Post Direct Selection Direct 40,005.00 40,020.00 Completed 2018-07-17 2018-07-17 2018-07-22 2018-11-04 2018-08-10 2018-11-11 2018-12-10 2019-04-11 payroll system Management and Control GZ-MOFP-114611-CS-INDV Component 4: Project Individual / Financial Management TF / A6949 Implementation Support and Post Consultant Direct 35,280.00 35,280.00 Completed 2019-05-30 2019-05-23 2019-06-09 2019-05-30 2019-06-14 2019-05-30 2019-07-01 2019-07-01 2020-06-30 2020-06-30 Specialist Management Costs Selection GZ-MOFP-114615-CS-CDS / Component 1: Improving Introducing changes to Bisan Pending TF / A6949 Budget Expenditure Post Direct Selection Direct 30,000.00 0.00 2019-08-11 2019-08-21 2019-10-25 2020-04-22 system- Commitment Control Implementation Management and Control Module and training of users. GZ-MOFP-114612-CS-INDV / Accountant # 1 to support the Accountant General and Component 2: Improving Individual General Accounts Department TF / A6949 Financial Accountability of Post Consultant Open 12,000.00 10,800.00 Completed 2019-08-18 2019-08-25 2019-10-06 2019-11-03 2019-10-27 2019-11-10 2019-12-01 2019-12-03 2020-11-30 2021-01-04 (full-time) (first year) the PFM System Selection budgeted around $1,000 each per month. GZ-MOFP-126227-CS-INDV / Accountant # 2 to support the Accountant General and Component 2: Improving Individual General Accounts Department TF / A6949 Financial Accountability of Post Consultant Open 12,000.00 10,800.00 Completed 2019-08-18 2019-08-25 2019-10-06 2019-11-03 2019-10-27 2019-11-10 2019-12-01 2019-12-03 2020-11-30 2021-01-04 (full-time) (first year) the PFM System Selection budgeted around $1,000 each per month GZ-MOFP-126228-CS-INDV / Accountant # 3 to support the Accountant General and Component 2: Improving Individual General Accounts Department TF / A6949 Financial Accountability of Post Consultant Open 12,000.00 10,800.00 Completed 2019-08-18 2019-08-25 2019-10-06 2019-11-03 2019-10-27 2019-11-10 2019-12-01 2019-12-03 2020-11-30 2021-01-04 (full-time) (first year) the PFM System Selection budgeted around $1,000 each per month Component 4: Project Individual GZ-MOFP-141041-CS-INDV TF / A6949 Implementation Support and Post Consultant Direct 39,600.00 38,280.00 Completed 2019-10-17 2019-10-17 2019-10-17 2019-10-20 2019-10-17 2019-10-20 2019-11-01 2019-11-01 2020-10-31 2020-10-31 / PMU Procurement Specialist Management Costs Selection Component 1: Improving Individual GZ-MOFP-68932-CS-INDV / / Budget Expenditure Post Consultant Open 48,000.00 0.00 Canceled 2018-07-10 2018-07-12 2018-08-28 2018-09-18 2019-01-01 2019-12-31 PFM Advisor Management and Control Selection GZ-MOFP-139966-CS-CDS / IPSAS Expert (Mirabo Component 2: Improving Individual Shammas) for the adoption of TF / A6949 Financial Accountability of Post Consultant Direct 30,000.00 29,881.60 Signed 2019-11-25 2019-12-09 2019-12-05 2019-11-18 2019-12-14 2019-12-15 2020-01-06 2019-12-15 2021-01-04 International Public Sector the PFM System Selection Accounting Standards GZ-MOFP-146530-CS-INDV Component 2: Improving Individual / Financial Expert to Reduce TF / A6949 Financial Accountability of Post Consultant Direct 48,000.00 48,000.00 Completed 2019-11-28 2019-12-09 2019-12-08 2019-12-10 2019-12-29 2019-12-10 2020-02-02 2020-01-01 2020-09-30 2020-08-31 the Backlog of Financial the PFM System Selection Statements of the PA. GZ-MOFP-149443-CS-INDV / Majed Ayyad "IT Expert for Component 1: Improving Individual the supervision and TF / A6949 Budget Expenditure Post Consultant Direct 48,000.00 48,000.00 Signed 2019-12-09 2020-03-12 2019-12-19 2020-06-09 2019-12-20 2020-06-09 2019-12-23 2020-06-29 2022-06-30 implementation of the Payroll Management and Control Selection System" GZ-MOFP-153081-CS-INDV Component 4: Project Individual / PMU Project Manager- TF / A6949 Implementation Support and Post Consultant Direct 50,400.00 50,400.00 Signed 2020-01-15 2020-01-16 2020-01-25 2020-01-02 2020-01-26 2020-01-02 2020-02-03 2020-02-03 2021-02-02 Renewal Management Costs Selection Component 2: Improving Individual GZ-MOFP-153084-CS-INDV TF / A6949 Financial Accountability of Post Consultant Direct 18,000.00 19,200.00 Completed 2020-01-16 2020-02-16 2020-01-26 2020-03-09 2020-02-16 2020-03-09 2020-03-22 2020-04-01 2021-03-21 2021-03-31 / Auditor # 1 for SAACB the PFM System Selection Component 2: Improving Individual GZ-MOFP-153089-CS-INDV TF / A6949 Financial Accountability of Post Consultant Limited 18,000.00 17,400.00 Completed 2020-01-16 2020-02-16 2020-01-21 2020-03-09 2020-02-11 2020-03-09 2020-03-17 2020-04-01 2021-03-16 2021-03-31 / Auditor # 2 for SAACB the PFM System Selection Component 2: Improving Individual GZ-MOFP-153091-CS-INDV TF / A6949 Financial Accountability of Post Consultant Limited 18,000.00 17,400.00 Completed 2020-01-16 2020-02-16 2020-01-21 2020-03-09 2020-02-11 2020-03-17 2020-04-01 2021-03-16 2021-03-31 / Auditor # 3 for SAACB the PFM System Selection GZ-MOFP-173517-CS-INDV Component 4: Project Individual / Financial Management TF / A6949 Implementation Support and Post Consultant Direct 35,280.00 35,280.00 Signed 2020-05-29 2020-05-17 2020-06-08 2020-05-19 2020-06-13 2020-05-19 2020-06-30 2020-07-01 2021-06-30 Specialist Management Costs Selection Component 2: Improving Individual GZ-MOFP-182809-CS-INDV TF / A6949 Financial Accountability of Post Consultant Direct 48,000.00 48,000.00 Signed 2020-07-16 2020-07-16 2020-07-26 2020-07-21 2020-08-16 2020-07-21 2020-09-01 2020-09-01 2021-04-30 / Financial Expert the PFM System Selection GZ-MOFP-123226-CS-INDV / Individual Consultant to Component 1: Improving Individual work on the Israeli Deductions TF / A6949 Budget Expenditure Post Consultant Limited 20,000.00 0.00 Canceled 2019-07-31 2019-12-01 2019-08-05 2019-08-26 2019-09-30 2019-12-31 from Clearance Revenues Management and Control Selection transferred to the Palestinian Government GZ-MOFP-195439-CS-INDV Component 2: Improving Individual / Accountant # 4 to work on TF / A6949 Financial Accountability of Post Consultant Limited 12,000.00 10,800.00 Signed 2020-09-30 2020-09-17 2020-10-05 2020-10-07 2020-10-26 2020-10-07 2020-11-30 2020-12-01 2021-05-29 Net Lending the PFM System Selection GZ-MOFP-195441-CS-INDV Component 2: Improving Individual / Accountant # 5 to work on TF / A6949 Financial Accountability of Post Consultant Limited 12,000.00 10,800.00 Signed 2020-09-30 2020-09-17 2020-10-05 2020-10-07 2020-10-26 2020-10-07 2020-11-30 2020-12-01 2021-05-29 Net Lending the PFM System Selection GZ-MOFP-195299-CS-INDV Component 4: Project Individual / Procurement and Grants TF / A6949 Implementation Support and Post Consultant Direct 46,800.00 46,800.00 Signed 2020-09-30 2020-09-01 2020-09-30 2020-09-01 2020-09-30 2020-09-01 2020-11-01 2020-10-06 2021-10-31 Specialist Management Costs Selection GZ-MOFP-198031-CS-INDV / Contract Renewal for Component 2: Improving Individual Accountant # 1 to support the TF / A6949 Financial Accountability of Post Consultant Direct 12,000.00 10,800.00 Signed 2020-11-30 2020-10-19 2020-12-05 2020-11-01 2020-12-16 2020-11-01 2021-01-05 2020-12-08 2022-01-04 Accountant General and the PFM System Selection General Accounts Department Page 2 GZ-MOFP-198032-CS-INDV / Contract Renewal for Component 2: Improving Individual Accountant # 2 to support the TF / A6949 Financial Accountability of Post Consultant Direct 12,000.00 10,800.00 Signed 2020-11-30 2020-10-19 2020-12-05 2020-11-01 2020-12-16 2020-11-01 2021-01-05 2020-12-08 2022-01-04 Accountant General and the PFM System Selection General Accounts Department GZ-MOFP-198034-CS-INDV / Contract Renewal for Component 2: Improving Individual Accountant # 3 to support the TF / A6949 Financial Accountability of Post Consultant Direct 12,000.00 10,800.00 Signed 2020-11-30 2020-10-19 2020-12-05 2020-11-01 2020-12-16 2020-11-01 2021-01-05 2020-12-08 2022-01-04 Accountant General and the PFM System Selection General Accounts Department GZ-MOFP-208240-CS-INDV Component 4: Project Individual / PMU Project Manager - TF / A6949 Implementation Support and Post Consultant Direct 50,400.00 50,400.00 Signed 2020-12-17 2020-12-10 2020-12-27 2020-12-10 2020-12-28 2020-12-15 2021-02-03 2021-02-03 2022-02-02 Contract renewal. Management Costs Selection Component 2: Improving Individual GZ-MOFP-211945-CS-INDV TF / A6949 Financial Accountability of Post Consultant Direct 48,000.00 48,000.00 Signed 2021-02-28 2021-02-25 2021-03-10 2021-04-13 2021-03-31 2021-04-29 2021-05-01 2021-04-29 2021-12-31 / Financial Expert the PFM System Selection GZ-MOFP-211946-CS-INDV Component 2: Improving Individual / Contract Renewal of Auditor TF / A6949 Financial Accountability of Post Consultant Direct 19,200.00 19,200.00 Signed 2021-01-31 2021-01-11 2021-02-10 2021-01-18 2021-03-03 2021-01-18 2021-04-01 2021-04-01 2022-03-31 # 1 for the benefit of SAACB the PFM System Selection GZ-MOFP-211947-CS-INDV Component 2: Improving Individual / Contract renewal Auditor # TF / A6949 Financial Accountability of Post Consultant Direct 17,400.00 17,400.00 Signed 2021-01-31 2021-01-11 2021-02-10 2021-01-18 2021-03-03 2021-01-18 2021-04-01 2021-04-01 2022-03-31 2 for SAACB the PFM System Selection GZ-MOFP-211950-CS-INDV Component 2: Improving Individual / Contract Renewal for TF / A6949 Financial Accountability of Post Consultant Direct 17,400.00 17,400.00 Signed 2021-01-31 2021-01-11 2021-02-10 2021-01-18 2021-03-03 2021-01-18 2021-04-01 2021-04-01 2021-09-28 Auditor # 3 SAACB the PFM System Selection Component 1: Improving GZ-MOFP-211920-CS-CDS / Pending TF / A6949 Budget Expenditure Post Direct Selection Direct 136,000.00 0.00 2020-12-31 2021-01-31 2021-03-23 2021-12-31 Bisan Service Agreement Implementation Management and Control GZ-MOFP-214311-CS-CDS / Component 4: Project Under Hiring an external auditor for TF / A6949 Implementation Support and Post Direct Selection Direct 6,600.00 0.00 2021-01-31 2021-01-26 2021-02-10 2021-04-16 2022-12-31 Implementation the Project Management Costs GZ-MOFP-214317-CS-INDV Component 2: Improving Individual Under / IT Consultant for the benefit TF / A6949 Financial Accountability of Post Consultant Limited 24,000.00 0.00 2021-02-07 2021-01-28 2021-02-26 2021-04-05 2021-03-19 2021-04-27 2021-04-23 2022-04-22 Implementation of SAACB the PFM System Selection Component 1: Improving Individual GZ-MOFP-214323-CS-INDV Under TF / A6949 Budget Expenditure Post Consultant Open 18,000.00 0.00 2021-01-31 2021-01-27 2021-03-21 2021-04-11 2021-05-16 2022-05-15 / IT Expert-Part Time Implementation Management and Control Selection Component 1: Improving Individual GZ-MOFP-214327-CS-INDV Under TF / A6949 Budget Expenditure Post Consultant Open 36,000.00 0.00 2021-01-31 2021-01-27 2021-03-21 2021-04-11 2021-05-16 2022-05-15 / Resident Senior Accountant Implementation Management and Control Selection GZ-MOFP-226305-CS-INDV Component 4: Project Individual / PMU-Financial Management TF / A6949 Implementation Support and Post Consultant Direct 37,044.00 37,044.00 Signed 2021-04-29 2021-04-11 2021-05-09 2021-04-14 2021-05-14 2021-04-14 2021-05-17 2021-05-03 2022-06-30 Specialist-Contract Renewal Management Costs Selection GZ-MOFP-235900-CS-INDV Component 2: Improving Individual / Replacement Accountant # 1 Under TF / A6949 Financial Accountability of Post Consultant Direct 10,800.00 0.00 2021-06-03 2021-05-25 2021-06-06 2021-06-10 2021-06-11 2021-06-10 2021-07-01 2022-06-30 to Support the general Implementation the PFM System Selection accounts department. GZ-MOFP-235906-CS-INDV / Hire an individual consultant to develop Financial and Component 1: Improving Individual Under Institutional/administrative TF / A6949 Budget Expenditure Post Consultant Limited 30,000.00 0.00 2021-07-06 2021-05-25 2021-07-11 2021-08-01 2021-09-05 2022-03-04 Implementation framework for the net lending Management and Control Selection department established at the MoF Page 3 LIBERIA AGENCY for COMMUNITY EMPOWERMENT Abbreviated Procurement Plan Attachment I – Procurement Plan I. General 1. Project Information: Country: Liberia Project Name: Youth Opportunities Project Project ID No.: P146827 Credit Number: 5621 - LR Executing Agencies: Liberia Agency for Community Empowerment 2. Bank’s approval Date of the procurement Plan: June March16 11, 20157 3. Date of General Procurement Notice: December 20, 2016 4. Period covered by this procurement plan: March 12, 2015 to August 10, 2016June 2017 to May 31, 2018 II. Goods, Supply & Installation of Plant & Equipment, Works & non- Consulting Services. 5. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: World Bank’s Guidelines: Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits & Grants (January 2011 edition) and revised in July 2014, and is open to all eligible bidders as defined in the guidelines. Consulting services will be selected in accordance with the World Bank’s Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers (January 2011 edition) and revised July, 2014 and Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants, dated October 15, 2006, and revised in January 2011. Table 1: Thresholds for Procurement Methods and Prior Review – Goods and Works and Non Consultant Services Expenditure Procurement Contract Value Threshold Contracts Subject to Category Method For use of Method (US$) Prior Review (US$) 1. Works ICB(Works/Supply & >=5,000,000 All contracts Installation) NCB >=200,000 - <5,000,000 As in procurement plan Shopping <200,000 None Direct Contracting All values All contracts 2. Goods and ICB >=500,000 All contracts Non NCB >=100,000 <500,000 As in procurement plan Consultant Shopping <500,000 (motor vehicles None Services only) Shopping <100,000 000 (rest not None motor vehicles) Direct Contracting All values All contracts Procurement from All values None UNOPS Agency 6. Prequalification. Not expected for the works/goods packages. 7. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: N/A 8. Reference to (if any) Project Operational/Procurement Manual: Yes 9. Any Other Special Procurement Arrangements: None 10. Procurement Packages with Methods and Time Schedule a) Works b) Procurement of Goods and Non Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estim Procure Prequa Nation Revie Expecte Expect Comme No. (Description) ated ment lificatio al w d bid ed nts Cost Method n Prefer by opening Contra US$ (yes/no ence Bank date ct millio ) (yes/n (Prior Signat n o) / ure Post) Date Goods 1. Procurement of 88,000 Shopping No No Post 12/01/17 12/21/1 .00 7 off road Vehicles (Station wagons) 2 No. 2. Agro Inputs 187,82 Shopping No No Post 11/09/17 11/14/1 4.00 7 (Tools & Planting Materials) (To be procured per county) 3. Motorbikes(14) 53,200 Shopping No No Post 07/24/17 08/15/1 .00 7 for County Coordinators movements in the fifteen counties 4. Supply of 25.200 Shopping No No Post 07/03/17 07/14/1 .00 7 computers (21 laptops and 1 desk top), duplex printer (1) 5. Supply of (6) Air 3,000. Shopping No No Post 07/03/01 07/14/1 00 7 7 conditioners - (2) 12000 btus and (6) 9000 btus; 1 refrigerator and 1 water dispenser. 6. Supply of 6,600. Shopping No No Post 07/03/17 07/14/1 00 7 assorted stationery supplies including cartridges 7. Supply of office 8,500. Shopping No No Post 07/03/17 07/14/1 00 7 furniture (6 wooden desks- 1 executive and 5 L-shape desks; 27 chairs - 6 executive chairs, 10 conference table chairs, and 10 visitors chairs; ) (15 sets window blinders), two doors and (7) cabinets - 1 transparent and 6 ordinary) 8. Supply of office 2,100. Shopping No No Post 07/03/17 07/14/1 00 7 consumables - tea, milk, tissues, sugar, deltol, detergents, air freshner, hand sensitizer, etc. Total 374,4 24 III. Selection of Consultants 11. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Table 2: Thresholds for Consultants Selection Methods and Prior Review Contract Value Threshold Expenditure Contracts Subject to Selection Method For use of Selection Category Prior Review (US$) Method (US$) Firms QCBS,QBS >=200,000 All contracts CQS,LCS,QBS,FBS <200,000 As in procurement plan SSS All values All Contracts Individual Competitive All Contracts >=100,000 Consultants Selection (IC) IC Single Source All Contracts All Values Selection 12. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 13. Consultancy services estimated to cost above US$200,000 equivalent per contract and individual consultants assignments estimated to cost US$100,000 and above and all individual consultants hired on single source basis will be subject to prior review by the Bank. 14. The threshold for the use of Selection of Consultant firms based on Consultants’ Qualifications (CQS) is determined on a case by case basis taking into account the nature and complexity of the assignment but shall not exceed US$300,000 other than in exceptional situations and in accordance with paragraph 3.7 the Guidelines: Selection and Employment of Consultants. 15. Irrespective of the thresholds and category of risk, the Terms of Reference (TOR) for selection of consultants (firms of individuals), whether prior or post review shall be cleared by the Bank. c) Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 7 Ref. Description of Estimated Method Revie Expected Expected No. Assignment Cost of w date of Contract Comments US$ Selectio by proposal Signature n Bank submissi Date (Prior on / Post) 1. Production of TOT 6,000.00 ICS Post 09/01/17 09/06/17 Life Skills Training materials 2. Procurement of a 63,000.00 ICS Post N/A 01/02/17 Project Technical Team Manager 3. Procurement of a 45,000.00 ICS Post N/A Productive Public Works Officer 4. Procurement of a 36,000.00 ICS Post N/A 01/02/17 Financial Management Officer 5. Procurement of a 27,000.00 ICS Post N/A 01/02/17 Monitoring & Evaluation and Safeguard Officer 6. Procurement of a 32,400.00 ICS Post N/A 01/02/17 Procurement Officer 7. Procurement of an 32,400.00 ICS Post N/A 01/02/17 Internal Auditor 8. Procurement of an 18,000.00 ICS Post N/A 01/02/17 MIS/ Project Assistant 9. Procurement of a 12,600.00 ICS Post N/A 08/10/17 Montserrado County Coordinator 10. Procurement of a 12,600.00 ICS Post N/A 08/10/17 Bomi County Coordinator 11. Procurement of a 12,600.00 ICS Post N/A 08/10/17 Grand Cape Mount County Coordinator 12. Procurement of a 12,600.00 ICS 08/10/17 Grand Bassa County Coordinator 13. Procurement of a 12,600.00 ICS Post N/A 08/10/17 River Cess County Coordinator 14. Procurement of a 12,600.00 ICS Post N/A 08/10/17 Margibi County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Gbarpolu County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Bong County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Lofa County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Nimba County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 River Gee County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Grand Gedeh County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Sinoe County Coordinator Procurement of a 12,600.00 ICS post N/A 08/10/17 Maryland County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Grand Kru County Coordinator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Bomi Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Grand Cape Mount Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Grand Bassa Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Margibi Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Gbarpolu Community Facilitator Procurement of a 20,000.00 CQS post 02/03/17 02/27/17 Bong Community Facilitator Procurement of a 20,000.00 CQS Post 02/27/17 Lofa Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Nimba Community Facilitator Procurement of a 20,000.00 CQS post 02/03/17 02/27/17 River Gee Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Grand Gedeh Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Grand Kru Community Facilitator Procurement of a 20,000.00 CQS Post 02/27/17 Sinoe Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 Rivercee Community Facilitator Consulting 240,000.00 QCBS Post 03/06/17 04/27/17 Services for Apprenticeship training for Household Enterprise beneficiaries Service Providers 287,899.00 QCBS Post 12/27/16 01/23/17 to supervise Household Enterprise beneficiaries Data Management 100,000.00 QCBS Post N/A 12/21/17 Firm (Consultancy Firm) TOTAL d) Training and Workshop Ref. Training, workshop and study Estimated Estimated Expected Training/workshop No. tours Cost (US$) Duration (Days) Date 1. 2. GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan. A detailed training and workshops’ plan giving nature of training/workshop, number of trainees/participants, duration, staff months, timing and estimated cost will be submitted to the Bank for review and approval prior to initiating the process. The selection methods will derive from the activity requirement, schedule and circumstance. After the training, the beneficiaries will be requested to submit a brief report indicating what skill have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operating costs: Incremental recurrent expenditures during project implementation, including maintenance of vehicles, fuel, equipment, office supplies, utilities, consumables, banking charges, advertising expenses, internet service, car insurance, travel, per diems, and accommodations, but excluding salaries of civil and public servants, will be procured using the implementing agency's administrative procedures reviewed and found acceptable by the Bank. PROCUREMENT Liberia : Liberia Youth Opportunities Project PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2018-05-28 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146827 GPN Date: Project Name: Liberia Youth Opportunities Project Loan / Credit No: IDA / 56210 Ministry of Youth and Sport Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-MOYS-62740-CW-RFQ / Project Implementation and Request for Single Stage - One 2019-01- IDA / 56210 Post Limited 21,000.00 0.00 Canceled 2018-06-13 2018-07-18 Office Renovation Coordination Quotations Envelope 14 Request for LR-MOYS-232451-CW-RFQ / Project Implementation and Request for Single Stage - One 2021-08- IDA / 56210 Post Limited Quotations (Non 67,950.00 69,141.16 Signed 2021-05-22 2021-05-13 2021-07-17 2021-05-27 Office Renovation Coordination Quotations Envelope 16 Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-62659-GO-RFQ / Procurement of Cross County Project Implementation and Request for Single Stage - One IDA / 56210 Post Limited 88,000.00 0.00 Canceled 2018-06-12 2018-06-29 2018-07-20 Vehicles for operations (2 Coordination Quotations Envelope Nos) LR-MOYS-62670-GO-RFQ / Project Implementation and Request for Single Stage - One Supply of additional laptop (2 IDA / 56210 Post Limited 2,700.00 0.00 Canceled 2018-06-11 2018-08-06 2019-02-02 Coordination Quotations Envelope No); Desktop (new) LR-MOYS-62747-GO-RFQ / Supply of additional air Project Implementation and Request for Single Stage - One IDA / 56210 Post Limited 2,100.00 0.00 Canceled 2018-05-23 2018-07-18 2019-01-14 condition (3) & Refregerators Coordination Quotations Envelope (2) LR-MOYS-62738-GO-RFQ / Project Implementation and Request for Single Stage - One IDA / 56210 Post Limited 10,200.00 0.00 Canceled 2018-06-11 2018-06-29 2018-12-26 Supply of office furnitures Coordination Quotations Envelope LR-MOYS-62704-GO-RFQ / Supply of laptop computers (6 Project Implementation and Request for Single Stage - One Nos); Desktop (1); Duplex IDA / 56210 Post Limited 10,800.00 0.00 Canceled 2018-06-11 2018-07-12 2019-01-08 Coordination Quotations Envelope printer (1); Portable printer (3 No) and Project (1) LR-MOYS-128979-GO-RFQ / Pre-Employment Social Procurement of Pre- Request for Single Stage - One IDA / 56210 Support and Household Post Limited 4,000.00 2,997.00 Completed 2019-10-05 2019-10-18 2019-11-30 2019-10-25 2020-05-28 2019-10-28 Employment Social Support Quotations Envelope Enterprises for Urban Youth Training Materials LR-MOYS-128980-GO-DIR / Pre-Employment Social Access to digital payment IDA / 56210 Support and Household Prior Direct Selection Direct 150,000.00 102,000.00 Signed 2019-09-30 2019-09-17 2019-10-05 2019-10-03 2019-11-09 2019-10-14 2020-05-07 (mobile phones for Enterprises for Urban Youth beneficiaries) LR-MOYS-81962-GO-RFQ / Project Implementation and Request for Single Stage - One Procurement of Portoble IDA / 56210 Post Limited 900.00 0.00 Canceled 2018-11-17 2019-01-30 2019-01-12 2019-07-11 Coordination Quotations Envelope Printersfor office use ( 3 PCS) LR-MOYS-221066-GO-RFQ / Project Implementation and Request for Single Stage - One IDA / 56210 Post Limited 3,750.00 0.00 Canceled 2021-03-04 2021-04-29 2021-05-29 Signboards Coordination Quotations Envelope LR-MOYS-235912-GO-RFQ / Pre-Employment Social Pending Request for Single Stage - One Business Enhancement IDA / 56210 Support and Household Post Limited 31,000.00 0.00 Implementati 2021-06-04 2021-07-30 2021-07-30 Quotations Envelope Support Enterprises for Urban Youth on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-128978-NC-RFQ / Pre-Employment Social Request for Single Stage - One Production of Video IDA / 56210 Support and Household Post Limited 4,000.00 0.00 Canceled 2019-09-30 2019-11-25 2020-05-23 Quotations Envelope Documentary Enterprises for Urban Youth LR-MOYS-195976-NC-RFQ / Project Implementation and Request for Single Stage - One Equipment Rental for YOP IDA / 56210 Post Limited 2,950.00 2,949.93 Completed 2020-10-04 2020-09-30 2020-11-09 2020-10-12 2021-06-30 2020-11-07 Coordination Quotations Envelope Information Sharing LR-MOYS-235909-NC-RFQ / Pending Project Implementation and Request for Single Stage - One Production of Video IDA / 56210 Post Limited 9,000.00 0.00 Implementati 2021-06-04 2021-07-31 2021-08-01 Coordination Quotations Envelope Documentary on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-62749-CS-QCBS / Pre-Employment Social Consultant Recruitment of IDA / 56210 Support and Household Post Qualification Open - International 135,936.00 0.00 Canceled 2018-06-05 2018-07-03 2018-07-24 2018-08-06 2018-09-10 2019-03-09 firm/Consultant for PESS Enterprises for Urban Youth Selection Page 1 LR-MOYS-80411-CS-CQS / Pre-Employment Social Consultant Pre-Employment & Social IDA / 56210 Support and Household Post Qualification Open - International 125,000.00 124,993.60 Completed 2018-10-19 2018-10-11 2018-11-09 2018-10-11 2018-12-23 2018-12-17 2019-01-22 2019-01-31 2019-02-26 2019-02-14 2019-08-25 2020-02-29 Support Implementation Enterprises for Urban Youth Selection LR-MOYS-62752-CS-LCS / Recruitment of Project Implementation and Least Cost IDA / 56210 Post Open - National 8,000.00 0.00 Canceled 2018-06-08 2016-08-22 2018-06-29 2018-08-12 2018-09-09 2018-10-09 2018-11-13 2018-12-18 2019-06-16 Firm/Consultant for External Coordination Selection Auditor LR-MOYS-81961-CS-CQS / Consultant Recruitment of Project Implementation and IDA / 56210 Post Qualification Open - National 8,000.00 8,000.00 Signed 2016-08-15 2018-11-02 2016-09-05 2016-10-19 2018-09-20 2016-11-18 2018-01-10 2016-12-23 2018-01-10 2017-06-21 Firm/Consultant for External Coordination Selection Auditor LR-MOYS-134874-CS-CQS / Consultant Project Implementation and Annual Beneficiary Satisfaction IDA / 56210 Post Qualification Open - National 86,000.00 72,000.20 Signed 2019-09-30 2019-09-16 2019-10-21 2019-09-25 2019-12-04 2019-11-22 2020-01-03 2020-01-03 2020-02-07 2020-01-10 2020-04-30 Coordination Survey Selection LR-MOYS-128977-CS-LCS / Capacity Building for Cash Least Cost IDA / 56210 Post Open - National 15,000.00 0.00 Canceled 2019-09-30 2019-10-21 2019-12-04 2020-01-01 2020-01-31 2020-03-06 2020-04-10 2020-10-07 External Audit Transfer Program Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-62728-CS-INDV / Individual Project Implementation and Recruitment of International IDA / 56210 Post Consultant Open 96,000.00 0.00 Canceled 2018-06-07 2016-11-28 2018-07-19 2018-08-09 2018-09-13 2019-03-12 Coordination Procurement Specialist Selection LR-MOYS-62703-CS-INDV / Pre-Employment Social Individual Recruitment Grivence Redress IDA / 56210 Support and Household Post Consultant Limited 27,000.00 0.00 Canceled 2018-06-05 2016-11-01 2018-06-10 2018-07-24 2018-08-28 2019-02-24 Officer Enterprises for Urban Youth Selection LR-MOYS-62665-CS-INDV / Individual Project Implementation and Recruitment of Program IDA / 56210 Post Consultant Limited 18,000.00 0.00 Canceled 2018-06-04 2016-11-01 2018-06-09 2018-06-22 2018-07-27 2019-01-23 Coordination Assistant Selection LR-MOYS-65232-CS-INDV / Individual Project Implementation and Recruitment of Senior IDA / 56210 Post Consultant Open 72,000.00 0.00 Canceled 2018-06-12 2016-09-04 2018-07-31 2018-08-21 2018-09-25 2019-03-24 Coordination Program Officer Selection LR-MOYS-62862-CS-CQS / Individual Project Implementation and Recruitment of Project IDA / 56210 Post Consultant Open 81,800.00 0.00 Canceled 2018-06-12 2016-09-04 2018-07-31 2018-08-21 2018-09-25 2019-03-24 Coordination Coordinator Selection LR-MOYS-62708-CS-INDV / Pre-Employment Social Individual Recruitment of IDA / 56210 Support and Household Post Consultant Limited 36,000.00 0.00 Canceled 2018-06-07 2016-12-01 2018-06-12 2018-06-04 2018-07-03 2018-08-07 2019-02-03 Communication Officer Enterprises for Urban Youth Selection Pre-Employment Social Individual LR-MOYS-62743-CS-INDV / IDA / 56210 Support and Household Post Consultant Limited 27,000.00 0.00 Canceled 2018-06-06 2018-06-11 2018-07-02 2018-08-06 2019-02-02 Recruitment of M & E Officer Enterprises for Urban Youth Selection LR-MOYS-62726-CS-INDV / Individual Project Implementation and Recruitment of Account IDA / 56210 Post Consultant Limited 36,000.00 0.00 Canceled 2018-06-06 2018-06-11 2018-07-02 2018-08-06 2019-02-02 Coordination Management (PFMU) Selection LR-MOYS-81957-CS-CDS / Recruitment of a firm for Project Implementation and IDA / 56210 Post Direct Selection Direct 19,200.00 19,200.00 Completed 2018-07-20 2018-10-17 2018-07-30 2018-10-03 2019-03-01 2019-04-01 2019-03-01 external audit for fiscal year Coordination 2017/2018 LR-MOYS-81954-CS-INDV / Individual Recruitment for Project Implementation and IDA / 56210 Post Consultant Open 24,000.00 24,000.00 Completed 2018-05-15 2018-08-06 2018-07-03 2018-08-31 2018-07-24 2018-09-17 2018-08-28 2018-09-21 2019-02-24 2019-09-30 Communiications Officer FY Coordination Selection 20182019 LR-MOYS-81958-CS-CDS / Project Implementation and Recruitment of Project IDA / 56210 Post Direct Selection Direct 54,120.00 4,000.00 Signed 2016-10-07 2016-08-01 2016-10-17 2016-12-21 2016-09-15 2017-06-19 Coordination Coordinator LR-MOYS-81945-CS-CDS / Project Implementation and Recruitment of Senior IDA / 56210 Post Direct Selection Direct 48,000.00 150,000.00 Signed 2016-10-07 2016-08-01 2016-10-17 2016-11-15 2016-12-21 2016-09-26 2017-06-19 Coordination Program Officer Individual LR-MOYS-81952-CS-INDV / Project Implementation and IDA / 56210 Post Consultant Open 18,000.00 36,000.00 Signed 2016-10-07 2018-11-02 2016-11-25 2017-02-16 2016-12-16 2017-03-06 2017-01-20 2017-03-27 2017-07-19 Recruitment of M & E Officer Coordination Selection LR-MOYS-81947-CS-INDV / Individual Recruitment of Project Implementation and IDA / 56210 Post Consultant Open 24,000.00 19,200.00 Signed 2016-10-07 2016-12-15 2016-11-25 2017-01-26 2016-12-16 2017-03-20 2017-01-20 2017-03-27 2017-07-19 Communication Officer FY Coordination Selection 20172018 LR-MOYS-81955-CS-INDV / Individual Project Implementation and Recruitment of Program IDA / 56210 Post Consultant Open 12,000.00 24,000.00 Signed 2016-10-07 2016-12-16 2016-11-25 2017-03-06 2016-12-16 2017-03-20 2017-01-20 2017-03-24 2017-07-19 Coordination Assistant Selection LR-MOYS-81964-CS-INDV / Individual Project Implementation and Recruitment Grivence Redress IDA / 56210 Post Consultant Open 18,000.00 18,000.00 Signed 2016-11-14 2016-12-15 2017-01-02 2017-03-06 2017-01-23 2017-03-20 2017-02-27 2017-03-24 2017-08-26 Coordination Officer Selection LR-MOYS-81948-CS-CDS / Project Implementation and Recruitment of Account IDA / 56210 Post Direct Selection Direct 24,000.00 24,000.00 Signed 2016-11-10 2017-01-17 2016-11-20 2018-01-29 2017-01-24 2018-01-01 2017-07-23 Coordination Management (PFMU) LR-MOYS-81950-CS-INDV / Individual Project Implementation and Under Recruitment of International IDA / 56210 Prior Consultant Open 96,000.00 0.00 2016-11-10 2021-04-21 2016-12-29 2017-03-06 2017-01-19 2017-02-23 2017-08-22 Coordination Implementation Procurement Specialist Selection LR-MOYS-94777-CS-INDV / Individual Project Implementation and Procurement of a Senior IDA / 56210 Prior Consultant Limited 24,000.00 0.00 Canceled 2019-02-20 2019-03-11 2019-02-25 2019-03-18 2019-04-22 2020-04-16 Coordination Procurement Officer Selection Page 2 LR-MOYS-106128-CS-INDV Individual Project Implementation and / Hiring of a Procurement IDA / 56210 Prior Consultant Limited 24,000.00 0.00 Canceled 2019-03-20 2019-03-19 2019-03-25 2019-03-20 2019-04-15 2019-05-20 2020-05-14 Coordination Specialist Selection LR-MOYS-108034-CS-INDV Individual Project Implementation and / Hiring of a Procurement IDA / 56210 Prior Consultant Limited 24,000.00 24,000.00 Signed 2019-03-19 2019-03-28 2019-03-24 2019-04-03 2019-04-14 2019-06-26 2019-05-19 2019-07-01 2020-05-13 Coordination Specialist Selection Individual LR-MOYS-114073-CS-INDV Project Implementation and IDA / 56210 Post Consultant Open 5,000.00 5,000.00 Completed 2019-05-15 2019-05-13 2019-07-03 2019-08-12 2019-07-24 2019-08-14 2019-08-21 2019-09-02 2020-02-17 2020-09-02 / YOP Website Development. Coordination Selection LR-MOYS-134380-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 12,500.00 0.00 Canceled 2019-09-18 2019-09-28 2019-12-02 2020-05-30 MIS Consultant Coordination LR-MOYS-134873-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 12,500.00 12,000.00 Signed 2019-09-19 2019-08-23 2019-09-29 2019-10-07 2019-12-03 2019-10-09 2020-05-31 MIS Consultant Coordination LR-MOYS-136594-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 33,048.00 33,048.00 Completed 2019-09-30 2019-10-03 2019-10-10 2019-09-27 2019-12-14 2019-10-07 2020-06-11 2020-06-30 Senior Program Officer Coordination LR-MOYS-136590-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 37,261.62 86,943.78 Signed 2019-10-04 2019-10-03 2019-10-14 2019-09-27 2019-12-18 2019-10-07 2020-06-15 National Program Coordinator Coordination LR-MOYS-136591-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 10,800.00 10,800.00 Completed 2019-09-30 2019-10-03 2019-10-10 2019-09-27 2019-12-14 2019-10-07 2020-06-11 2020-03-31 Communications Officer Coordination LR-MOYS-186219-CS-CDS / Pre-Employment Social Pre-employment Social IDA / 56210 Support and Household Post Direct Selection Direct 108,400.00 104,706.00 Signed 2020-08-29 2020-08-06 2020-09-08 2020-08-11 2020-11-12 2020-09-01 2021-05-11 Support Round Two Enterprises for Urban Youth Individual LR-MOYS-191398-CS-INDV Project Implementation and IDA / 56210 Post Consultant Limited 10,000.00 9,000.00 Signed 2020-09-30 2020-09-02 2020-10-05 2020-09-06 2020-10-26 2020-09-12 2020-11-30 2020-09-14 2021-06-30 / Program Support Officer Coordination Selection LR-MOYS-191403-CS-INDV Individual Project Implementation and / Administrative/GRM IDA / 56210 Post Consultant Limited 5,000.00 4,500.00 Signed 2020-09-30 2020-09-02 2020-10-05 2020-09-04 2020-10-26 2020-09-12 2020-11-30 2020-09-14 2021-06-30 Coordination Assistant Selection LR-MOYS-214934-CS-INDV Individual Project Implementation and / Environmental Social IDA / 56210 Post Consultant Limited 5,000.00 5,000.00 Completed 2021-02-05 2021-01-19 2021-02-10 2021-01-24 2021-03-03 2021-01-29 2021-04-07 2021-01-30 2021-04-30 2021-02-25 Coordination Consultant Selection LR-MOYS-220491-CS-INDV Individual Project Implementation and / Implementation Completion IDA / 56210 Post Consultant Open 40,000.00 35,000.00 Signed 2021-03-29 2021-02-24 2021-05-17 2021-04-11 2021-06-07 2021-04-29 2021-07-12 2021-05-01 2021-09-30 Coordination Report (ICR) Selection LR-MOYS-220490-CS-INDV Individual / Development of Project Project Implementation and IDA / 56210 Post Consultant Limited 10,000.00 8,000.00 Signed 2021-03-29 2021-02-24 2021-04-03 2021-03-02 2021-04-24 2021-03-29 2021-05-29 2021-04-01 2021-08-27 Operations Manual and Coordination Selection handbooks LR-MOYS-234760-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 2,000.00 1,000.00 Signed 2021-05-17 2021-05-23 2021-05-27 2021-05-23 2021-07-31 2021-05-25 2021-08-01 MIS/Program Assistant Coordination Page 3 PROCUREMENT PLAN Project information: Lao PDR - Public Finance Management Reform Grant Project Implementation agency: Ministry of Finance Date of the Procurement Plan: October 12, 2018 Period covered by this Procurement Plan: at least 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Law and the Instruction on Implementation Public Procurement Law, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. a) The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; b) Information related to award of contract including reasons for rejection of unsuccessful bidders shall be published on the implementing agency websites and/or newspaper of wide circulation. c) All complaints on procurement related matters including complaints arising from procurement under Bank financed Projects whilst using National Procurement Procedures shall be dealt with in accordance with Article 33 of the Procurement Decree. Borrower shall put in place an effective complaints review mechanism for dealing with procurement related complaints, and shall disclose the details in all the bidding documents. All complaints shall be recorded by the 1 Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. I. Works and Goods and Non-Consultant Services 1.1.Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Annex II of the Procurement Regulations: Category Procurement Method Prior Review Thresholds Thresholds Applicable Remarks Applicable Remarks thresholds thresholds (US$) (US$) Works RFB through ≥ 2.0 million – Above 10 million This has not been Open foreseen at the International project preparation market stage. approach RFB through ≥ 200,000 < – None - Open National 2.0 million market approach Request for < 200,000 – None – Quotation Direct Selection None No threshold; Same as for This has not been meet competitive foreseen at the requirements of selection project preparation regulations stage. 7.13-7.15 Goods and Non-Consulting Services 2 RFB through ≥ 0.6 million – Above US$ 2 This has not been Open million foreseen at the International project preparation market stage. approach RFB through ≥ 100,000 < - None Risk-based approach Open National 0.6 million market approach Request for < 100,000 None Quotation Direct Selection None No threshold; Same as for This has not been meet competitive foreseen at the requirements of selection project preparation regulations stage. 7.13-7.15 1.2 Procurement packages for Goods (prior and post reviews) with method and Time Schedule Ref. Contract (Description) Estimat Procurem Revie Expecte Comme No. ed Cost ent w by d Bids nts (US$) Method Bank Opening (Prior Date / Post) G-01 ICT equipment for MoHA 50,000 RFQ Post Feb 15, and Project 2019 Implementation Unit G-02 Office furniture, printers, 10,000 Shopping Post Feb 15, etc for PIU 2019 G-03 Financial Management 5,000 Shopping Post Feb 15, software 2019 Total Goods 65,000 II. Selection of Consultants 2.1 Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II of the Procurement Regulations: Procurement Method Thresholds Prior Review Thresholds Applicable Applicable Category thresholds Remarks thresholds Remarks (US$) (US$) QCBS, QBS, FBS, ≥ 300,000 Shortlist of only ≥ 1.0 million Risk-based LCS (Using the National Consultants approach most appropriate (Firms) for contract market approach) agreed in the PP CQS (Open or < 300,000 QCBS, QBS, FBS, LCS) None limited can be applied for competition contracts with value through national or under $300,000 international market approach, specified in the PP and agreed with the Bank. 3 Direct Selection of None No threshold; meet Same as for This has not firms requirements of competitive been foreseen regulations 7.13-7.15 selection at the project preparation stage. Individual N/A Essential individual ≥ 300,000 Risk-based Consultants depending assignments will be and for the approach on nature of defined in the positions as services Procurement Plan specified in agreed with the Bank the PP and in line with agreed with regulations 7.34-7.39 the Bank using the most appropriate market approach 2.2 Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 7.1, Section VII of the Procurement Regulations. 2.3 Consultancy Assignments with Selection Methods and Time Schedule Ref. Description of Estimat Selecti Review Expected Comme No. Assignment ed Cost on by Proposals nts US$ Metho Bank Submissio d (Prior / n Date Post) IC-01 PIU Coordinator 36,000 IC Post Jan. 10, 2019 IC-02 PIU Assistant 15,000 IC Post Jan. 10, 2019 IC-03 Financial Management 36,000 IC Post Jan. 10, Consultant* 2019 IC-04 Procurement Consultant 36,000 IC Post Jan. 10, 2019 IC-05 Procurement Assistant 15,000 IC Post Jan. 10, 2019 IC-06 Accountant* 24,000 IC Post Jan. 10, 2019 IC-07 M&E Consultant 30,000 IC Post Jan. 10, 2019 IC-08 Change Management 30,000 IC Post Feb. 15, Consultant 2019 CQS- Audit Firm* 30,000 CQS Post Feb. 15, 01 2019 QCBS - Consulting services for the 500,000 QCBS Post April 2019 01 preparation of the technical specifications and bidding documents for FMIS* Total consulting services 757,000 Total Goods and Consulting 817,000 Services * Although these packages are subject to procurement Post Review, the World Bank will do technical review. 4 Note: 1. To select external financial audit, project implementing agencies shall send their RFPs to all three qualified firms namely PwC, KPMG and EY; that are acceptable audit firms for bank financed projects in the Lao PDR. 5 PROCUREMENT Lao People's Democratic Republic : Lao PDR Public Finance Management Reform Project PLAN General Information Country: Lao People's Democratic Republic Bank’s Approval Date of the Original Procurement Plan: 2019-01-21 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167661 GPN Date: 2019-01-10 Project Name: Lao PDR Public Finance Management Reform Project Loan / Credit No: TF / A9517, / M Executing Agency(ies): inistry of Finance WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Enhanced G-01 / ICT equipment for budget preparation and Request for Single Stage - One MoHA and Project TF / A9517 Post Limited 50,000.00 63,955.08 Signed 2019-07-05 2019-12-12 2019-08-20 2020-01-24 2020-02-16 execution and Quotations Envelope Implementation Unit interoperability of government PFM systems Component 4: Public G-02 / Office furniture, Financial Management (PFM) Request for Single Stage - One TF / A9517 Post Limited 10,000.00 11,468.71 Signed 2019-01-16 2019-07-11 2019-03-13 2019-09-04 2019-09-09 printers, etc for PIU Reform and Program Quotations Envelope Coordination Component 4: Public G-03 / Financial Management Financial Management (PFM) Request for Single Stage - One TF / A9517 Post Limited 5,000.00 2,200.00 Signed 2019-08-03 2019-11-04 2019-09-28 2019-12-17 2020-03-26 software Reform and Program Quotations Envelope Coordination Component 4: Public Financial Management (PFM) Request for Single Stage - One G-04 / IT Equipment for PIU TF / A9517 Post Limited 25,000.00 24,268.51 Signed 2019-07-10 2019-07-03 2019-09-04 2019-08-12 2020-03-02 Reform and Program Quotations Envelope Coordination Component 4: Public Pending Financial Management (PFM) Request for Single Stage - One G-05 / Furniture for FPLD TF / A9517 Post Limited 1,200.00 0.00 Implementati 2020-07-20 2020-09-14 2021-03-13 Reform and Program Quotations Envelope on Coordination Component 4: Public G-06 / IT Equipment for PIU Financial Management (PFM) Request for Single Stage - One TF / A9517 Post Limited 5,000.00 13,556.01 Signed 2020-07-20 2020-09-28 2020-09-14 2020-12-04 2021-03-13 and PPMD Reform and Program Quotations Envelope Coordination NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QCBS-01 / Consulting Component 4: Public services for the preparation of Financial Management (PFM) Quality And Cost- the technical specifications / Post Open - International 500,000.00 0.00 Canceled 2019-02-01 2019-02-05 2019-02-22 2019-04-07 2019-05-05 2019-06-04 2019-07-09 2019-08-13 2020-08-12 Reform and Program Based Selection and bidding documents for Coordination FMIS Component 4: Public Consultant Financial Management (PFM) CQS-01 / External Audit Firm TF / A9517 Post Qualification Open - National 30,000.00 129,910.00 Signed 2019-02-01 2019-11-06 2019-02-22 2019-04-07 2019-11-11 2019-05-07 2020-05-04 2019-06-11 2020-05-22 2019-12-08 Reform and Program Selection Coordination QCBS-1 / Consulting services Component 2: Enhanced for the preparation of the budget preparation and Quality And Cost- technical specifications, bid TF / A9517 execution and Prior Open - International 500,000.00 1,048,576.00 Signed 2019-02-28 2019-02-11 2019-03-21 2019-02-11 2019-05-04 2019-07-18 2019-06-01 2019-08-30 2019-07-01 2020-01-21 2019-08-05 2020-06-15 2019-09-09 2020-06-30 2020-09-08 Based Selection evaluation and contract interoperability of supervision government PFM systems Component 2: Enhanced CQS-02 / Excel templates Consultant budget preparation and develop for Budget TF / A9517 Post Qualification Open - National 8,000.00 8,811.00 Signed 2019-09-10 2019-08-01 2019-10-01 2019-11-14 2020-08-06 2019-12-14 2020-10-12 2020-01-18 2020-11-20 2020-07-16 execution and Department Selection interoperability of government PFM systems INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Public Individual Financial Management (PFM) IC-01 / PIU Coordinator TF / A9517 Post Consultant Open 36,000.00 1,515.00 Terminated 2019-01-10 2019-01-01 2019-02-28 2019-06-01 2019-03-21 2019-06-07 2019-04-25 2019-06-28 2019-10-22 Reform and Program Selection Coordination Component 4: Public Individual IC-07 / Monitoring and Financial Management (PFM) TF / A9517 Post Consultant Open 30,000.00 21,780.00 Signed 2019-01-18 2019-01-02 2019-03-08 2019-07-18 2019-03-29 2019-07-19 2019-05-03 2019-08-02 2019-10-30 Evaluation (M&E) Specialist Reform and Program Selection Coordination Page 1 Component 2: Enhanced Individual IC-08 / Change Management budget preparation and TF / A9517 Post Consultant Open 30,000.00 0.00 Canceled 2019-01-18 2020-11-24 2019-03-08 2019-03-29 2019-05-03 2019-10-30 Specialist execution and Selection interoperability of government PFM systems Component 4: Public Individual Financial Management (PFM) IC-02 / PIU Assistant TF / A9517 Post Consultant Open 15,000.00 12,000.00 Signed 2019-01-18 2019-01-02 2019-03-08 2019-03-02 2019-03-29 2019-05-29 2019-07-01 2019-05-24 2019-12-28 Reform and Program Selection Coordination Component 4: Public Individual IC-03 / Financial Financial Management (PFM) TF / A9517 Post Consultant Open 36,000.00 25,200.00 Signed 2019-01-18 2019-01-02 2019-03-08 2019-06-03 2019-03-29 2019-05-28 2019-07-01 2019-06-25 2019-12-28 Management Specialist Reform and Program Selection Coordination Component 4: Public Individual IC-04 / Procurement Financial Management (PFM) TF / A9517 Post Consultant Open 36,000.00 25,200.00 Terminated 2019-01-18 2019-01-01 2019-03-08 2019-02-13 2019-03-29 2019-04-01 2019-07-01 2019-06-28 2019-12-28 Specialist Reform and Program Selection Coordination Component 4: Public Individual Financial Management (PFM) IC-06 / Accountant TF / A9517 Post Consultant Open 24,000.00 24,000.00 Signed 2019-01-18 2019-01-02 2019-03-08 2019-06-24 2019-03-29 2019-06-21 2019-07-01 2019-07-19 2019-12-28 Reform and Program Selection Coordination Component 4: Public Individual IC-09 / Procurement Financial Management (PFM) TF / A9517 Post Consultant Open 32,000.00 31,200.00 Signed 2019-07-15 2019-07-15 2019-09-02 2019-10-30 2019-09-23 2019-12-03 2019-10-28 2020-01-02 2020-04-25 Consultant to Support PPMD Reform and Program Selection Coordination Component 1: Improved Individual IC-10 / Consultant to TF / A9517 domestic revenue Post Consultant Open 24,000.00 22,440.00 Signed 2019-11-18 2019-07-31 2020-01-06 2020-02-05 2020-01-27 2020-02-06 2020-03-02 2020-07-01 2020-08-29 support on tax legislation mobilization Selection Component 2: Enhanced Individual IC-11 / Budget reform budget preparation and TF / A9517 Post Consultant Open 9,000.00 0.00 Canceled 2020-02-03 2020-12-18 2020-03-23 2020-04-13 2020-05-18 2020-11-14 Consultant 1 execution and Selection interoperability of government PFM systems Component 2: Enhanced Individual IC-12 / Budget reform budget preparation and TF / A9517 Post Consultant Open 9,000.00 0.00 Canceled 2020-02-03 2020-12-18 2020-03-23 2020-04-13 2020-05-18 2020-11-14 Consultant 2 execution and Selection interoperability of government PFM systems Component 2: Enhanced DS-01 / Methodology budget preparation and Under TF / A9517 Post Direct Selection Direct 2,000.00 0.00 2020-10-05 2020-12-16 2020-10-15 2020-12-19 2021-06-17 training /NUOL execution and Implementation interoperability of government PFM systems DS-02 / Recruit a local consultant to extract Component 1: Improved Under information from Tax TF / A9517 domestic revenue Post Direct Selection Direct 50,000.00 0.00 2021-03-02 2021-03-03 2021-03-14 2021-05-25 2021-11-21 Implementation Management Information mobilization System (TMIS) Component 1: Improved Individual IC-13 / Data Analysis Under TF / A9517 domestic revenue Post Consultant Limited 7,800.00 0.00 2021-05-25 2021-05-28 2021-05-30 2021-06-20 2021-07-25 2022-01-21 Consultant for RBA Implementation mobilization Selection Page 2 Plan de Passation de marchés I. Généralités 1. L'information sur le projet : Pays : Océan Indien ; Emprunteur : COMMISSION DE L’OCEAN INDIEN ; Nom de projet : P132123: First South West Indian Ocean Fisheries Governance and Shared Growth Project – SWIOFish1 Numéro du Crédit : IDA-Grant Number H– 995-3A Agence d’exécution du Projet : COMMISSION DE L’OCEAN INDIEN 2. Date d’approbation du Plan de passation de marchés par la Banque : 30/11/2015 ; Révision : 02/12/2016 ; 3. Date de notification du Plan Général de Passation de marchés : N/A ; 4. Période couverte par le Plan de Passation de marchés : 01/01/2018 au 31/12/2018 II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable : Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le paragraphe 3.1 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) et sur la base de l'évaluation de la capacité de l'agence d’exécution : Seuil de Méthode de Passation de revue à Commentaires marchés priori 1. AOI – Ouvert ou Restreint 2 000 000 Les montants (Biens) estimatifs des 2. AON (Biens) 2 000 000 marchés prévus 3. AOI (Travaux) 10 000 000 sont au-dessous 4. AON (Travaux) 10 000 000 des seuils. 5. AOI (Services) 2 000 000 Niveau de 6. UN -UNOPS (Biens) 2 000 000 risque : 7. ED (Biens/Travaux) 2 000 000 « SUBSTANTIEL » 2. Pré-qualification (selon les dispositions des paragraphes 6.19 à 6.24 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable. 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 6.52 et 6.53 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Non Applicable 5. Tout autre arrangement spécial en passation de marchés : Non Applicable. 6. Allotissement de fournitures avec méthodes et calendrier : [Enumérer d’abord les allotissements qui nécessitent la revue préalable de la Banque, ensuite les autres allotissements] 1 2 3 4 5 6 7 8 9 Réf. Description Contrat Coût Approche/Méth Pré- Préféren Revue de la Date Commentair No estimatif ode de qualificati ce Banque (à prévue es sélection on national priori / à d’ouverture Oui / Non e posteriori) des Oui / Non soumission s 0610 2- Acquisition d'équipement des Unita PY03 bureaux de la CPSOOI à Maputo 15,000.00 ire Shopping Non Non Postériori 09/05/2018 - (vidéoconférence) G001 Atelier sur les pratiques 0610 optimales et les leçons 2- d’expérience – Atelier de Forfai PY03 discussion sur des articles de 15,000.00 t Shopping Non Non Postériori 05/01/2018 - publications scientifiques à NC01 Maurice (conférence package & impression) 0610 Appui régional pour la mise en 2- œuvre des résolutions de la Forfai PY03 CTOI et la conformité à ces 2,620.00 Shopping Non Non Postériori 12/03/2018 t - résolutions (frais & conférence NC02 package & impression) 0610 Réunion du Groupe spécial sur 2- les conditions minimales Forfai PY03 d’accès (frais & conférence 2,500.00 Shopping Non Non Postériori 20/01/2018 t - package & impression) NC03 0610 Programme régional Forfai 2- d’observateurs (frais & 2,500.00 Shopping Non Non Postériori 10/08/2018 t 1 2 3 4 5 6 7 8 9 Réf. Description Contrat Coût Approche/Méth Pré- Préféren Revue de la Date Commentair No estimatif ode de qualificati ce Banque (à prévue es sélection on national priori / à d’ouverture Oui / Non e posteriori) des Oui / Non soumission s PY03 conférence package & - impression) NC04 0610 Atelier juridique pour 2- l’établissement d’un protocole PY03 d’échange d’informations dans Forfai - la région du sud-ouest de 2,000.00 Shopping Non Non Postériori 12/03/2018 t NC05 l’océan Indien (frais & conférence package & impression) 0610 Réunion sur les procédures 2- opérationnelles normalisées Forfai PY03 (frais & conférence package & 3,500.00 Shopping Non Non Postériori 10/02/2018 t - impression) NC06 0610 Atelier pour l’Afrique orientale, 2- l’Afrique australe et l’océan Forfai PY03 Indien (AO-AA-OI) - SADC 10,000.00 Shopping Non Non Postériori 09/04/2018 t - (conférence package) NC07 0610 Session de la CPSOOI et réunion 2- du Comité de pilotage régional Forfai PY03 de SWIO-Fish1 (frais & 10,400.00 Shopping Non Non Postériori 04/03/2018 t - conférence package & NC08 impression) 0610 Réunion du Groupe de travail 2- sur la collaboration et la Forfai PY03 coopération dans les pêcheries 10,840.00 Shopping Non Non Postériori 24/12/2017 t - de thon (frais & conférence NC09 package & impression) 1 2 3 4 5 6 7 8 9 Réf. Description Contrat Coût Approche/Méth Pré- Préféren Revue de la Date Commentair No estimatif ode de qualificati ce Banque (à prévue es sélection on national priori / à d’ouverture Oui / Non e posteriori) des Oui / Non soumission s 0610 Réunion du Comité scientifique 2- de la CPSOOI (frais & Forfai PY03 conférence package & 6,000.00 Shopping Non Non Postériori 08/01/2018 t - impression) NC10 0610 Réunion du Groupe de travail 2- de la CPSOOI sur l’évaluation Forfai PY03 des stocks de poissons 7,000.00 Shopping Non Non Postériori 08/09/2018 t - pélagiques (frais & conférence NC11 package & impression) 0610 Formation à l’utilisation du 2- logiciel « Système R » dédié à Forfai PY03 l’évaluation des stocks de 6,500.00 Shopping Non Non Postériori 08/09/2018 t - poissons (frais & conférence NC12 package & impression) III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans le paragraphe 3 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) : Méthode de sélection Seuil de Commentaires revue à priori 1. Méthode compétitive (firmes) 1 000 000 Les montants 2. Entente directe (firmes) 1 000 000 estimatifs des 3. Méthode compétitive (Consultant 300 000 contrats prévus individuel) sont au-dessous 4. Entente directe (Consultant 300 000 des seuils. individuel) Niveau de risque : « SUBSTANTIEL » 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de USD 150 000 par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 7.25 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016). 3. Tout autre arrangement spécial de Sélection de consultants : Non applicable 4. Tâches de consultation avec des méthodes de sélection et calendrier Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de (en USD) priori / à soumission posteriori) des propositions 0610 Consultance sur l'analyse coûts et 2- bénéfices (SWIOFish 1 framework Consultant PY03 15,000.00 Forfait Postériori 09/08/2018 agreement merging with Fisheries Individuel - Accord) C001 0610 2- Appui à l’institut KMFRI pour la mise en Consultant PY03 service de la base de données du projet 25,000.00 Forfait Postériori 09/08/2018 Individuel - SWIOFP C002 0610 2- Appui à l'élaboration résolutions de la Consultant PY03 5,000.00 Forfait Postériori 12/02/2018 CTOI Individuel - C003 0610 Etude de consultant sur la contribution 2- du secteur des pêches au PIB couvrant Consultant PY03 40,000.00 Forfait Postériori 30/03/2018 les secteurs primaire et secondaire dans Individuel - les Etats membres de la CPSOOI C004 0610 2- Evénements commerciaux à Maurice Consultant PY03 4,000.00 Forfait Postériori 08/02/2018 (interprétation) Individuel - C005 0610 Consultant 2- Programme régional d’observateurs 35,000.00 Forfait Postériori 23/08/2018 Individuel PY03 Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de (en USD) priori / à soumission posteriori) des propositions - C006 0610 2- Session de la CPSOOI et réunion du Consultant PY03 Comité de pilotage régional de SWIO- 6,000.00 Forfait Postériori 20/02/2018 Individuel - Fish1 (interprétation) C007 0610 2- Réunion du Groupe de travail sur la Consultant PY03 collaboration et la coopération dans les 9,000.00 Forfait Postériori 11/01/2018 Individuel - pêcheries de thon (interprétation) C008 0610 Activité de consultant pour l’élaboration 2- de lignes directrices relatives à Consultant PY03 40,000.00 Forfait Postériori 19/10/2018 l’évaluation de plans de gestion des Individuel - pêcheries C009 0610 2- Consultant PY03 Rédacteur scientifique 20,000.00 Forfait Postériori 19/10/2018 Individuel - C010 0610 2- Consultant PY03 Consultance (CPSOOI)/ NC 20,000.00 Forfait Postériori 09/082018 Individuel - C011 IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier 1. Dans cette section, les activités de renforcement de capacité acceptées (quelques articles pourraient être des recommandations de CPAR) sont énumérées avec le calendrier No. Résultats Coût Durée Date de Commentaires escomptés / estimatif estimative début Description de l’activité PROCUREMENT Eastern Africa : AFCC2/RI-South West Indian Ocean Fisheries Governance and Shared Growth Project 1 PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2018-06-25 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132123 GPN Date: Project Name: AFCC2/RI-South West Indian Ocean Fisheries Governance and Shared Growth Project 1 Loan / Credit No: IDA / H9950 Indian Ocean Commission Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 06102-PY03-G001 / Acquisition d'équipement des Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 15,000.00 0.00 Canceled 2018-08-12 2018-07-18 2018-10-17 2019-04-15 bureaux de la CPSOOI à regional collaboration Quotations Envelope Maputo (vidéoconférence) SWIO1-PY05-G002 / Component 4. Project Request for Single Stage - One Purchase of laptop for PMU's IDA / H9950 management and Post Limited 2,500.00 1,555.01 Signed 2020-11-08 2020-10-28 2021-01-03 2020-12-02 2021-02-22 Quotations Envelope Office -(M&E assistant) coordination SWIO1-PY05-G001 / Component 4. Project Pending Request for Single Stage - One Purchase of laptops for IDA / H9950 management and Post Limited 7,500.00 0.00 Implementati 2020-11-08 2021-01-03 2021-02-22 Quotations Envelope SWIOFC Secretariat coordination on SWIO1-PY06-G001 / Component 4. Project Pending Request for Single Stage - One Purchase of a printer for the IDA / H9950 management and Post Limited 4,000.00 0.00 Implementati 2021-07-03 2021-08-07 2021-08-22 Quotations Envelope PIU coordination on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 06102-PY03-NC03 / Location de sallle de conférence pour la Réunion Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 2,500.00 13,768.03 Signed 2018-07-07 2018-06-26 2018-09-11 2018-07-31 2019-03-10 du Groupe spécial sur les regional collaboration Quotations Envelope conditions minimales d'accès (réunion scientifique) 06102-PY03-NC08 / Location de sallle de conférence pour la Session de Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 10,400.00 4,780.40 Signed 2018-07-07 2018-08-01 2018-09-11 2018-10-02 2019-03-10 la CPSOOI et réunion du regional collaboration Quotations Envelope Comité de pilotage régional de SWIO-Fish1 à Cape Town 06102-PY03-NC09 / Location de salle de réunion Under pour la réunion du Groupe de Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 10,840.00 13,768.03 Implementati 2018-07-07 2018-06-26 2018-09-11 2019-03-10 travail sur la collaboration et regional collaboration Quotations Envelope on la coopération dans les pêcheries de thon 06102-PY03-NC01 / Location de salle de conférence pour la Atelier sur les pratiques optimales et les Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 15,000.00 25,832.42 Signed 2018-02-03 2018-01-05 2018-04-10 2018-02-09 2018-10-07 leçons d'expérience - Atelier regional collaboration Quotations Envelope de discussion sur des articles de publications scientifiques (Seychelles) 06102-PY03-NC04 / Location de salle de Component 1. Enhanced Request for Single Stage - One conférence pour la réunion du IDA / H9950 Post Limited 2,500.00 10,904.49 Signed 2018-02-17 2018-01-30 2018-04-24 2018-02-05 2018-10-21 regional collaboration Quotations Envelope programme régional d'observateurs (Cape Town) 06102-PY03-NC07 / Location de sallle de conférence pour la Atelier Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 10,000.00 5,844.98 Signed 2018-06-12 2018-08-02 2018-08-17 2018-08-03 2019-02-13 pour l'Afrique orientale, regional collaboration Quotations Envelope l'Afrique australe et l'océan Indien (AO-AA-OI) - SADC 06102-PY03-NC10 / Location de salle de Réunion Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 6,000.00 13,756.99 Signed 2018-01-23 2018-01-08 2018-03-30 2018-01-24 2018-09-26 du Comité scientifique de la regional collaboration Quotations Envelope CPSOOI SWIO1-PY04-NC02 / Location salle de réunion pour Component 1. Enhanced Request for Single Stage - One l'atelier pour l'Afrique de l'Est, IDA / H9950 Post Limited 6,000.00 7,140.11 Signed 2019-01-29 2019-03-21 2019-03-26 2019-06-06 2019-04-02 regional collaboration Quotations Envelope l'Afrique australe et l'océan Indien (EA-SA-IO)-SADC SWIO1-PY04-NC03 / Location salle de réunion pour Component 1. Enhanced Request for Single Stage - One la session de la CPSOOI et IDA / H9950 Post Limited 3,000.00 60,502.72 Signed 2019-08-06 2019-01-28 2019-10-01 2019-06-06 2019-10-08 regional collaboration Quotations Envelope comité de pilotage SWIOFish1: Octobre 2019 (Maldives) Page 1 SWIO1-PY04-NC05 / Under Location salle de réunion du Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 3,000.00 0.00 Implementati 2019-01-22 2019-04-23 2019-03-19 2019-03-26 Comité scientifique du regional collaboration Quotations Envelope on SWIOFC (Maputo) SWIO1-PY04-NC06 / Location salle de réunion du Component 1. Enhanced Request for Single Stage - One groupe de travail SWIOFC sur IDA / H9950 Post Limited 3,000.00 12,875.00 Signed 2019-07-08 2019-01-31 2019-09-02 2019-02-26 2019-09-09 regional collaboration Quotations Envelope l'évaluation des stocks de poissons pélagiques (Kenya) SWIO1-PY05-NC06 / National Workshop on legal Component 1. Enhanced IDA / H9950 Post Direct Selection Direct 100,243.00 100,243.00 Signed 2020-03-03 2020-03-02 2020-03-08 2020-02-26 2020-04-12 2020-03-11 2020-04-16 and institutional support to regional collaboration Somalia in Mogadishu 06102-PY03-NC11 / Location de sallle de conférence pour la réunion du Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 7,000.00 0.00 Canceled 2018-10-12 2018-12-07 2019-06-05 Groupe de travail de la regional collaboration Quotations Envelope CPSOOI sur l'évaluation des stocks de poissons pélagiques (Maputo) SWIO1-PY04-NC07 / Component 1. Enhanced Request for Single Stage - One Location salle de réunion pour IDA / H9950 Post Limited 1,410.00 0.00 Canceled 2019-07-16 2019-09-10 2019-09-20 regional collaboration Quotations Envelope le Bureau de la CPSOOI SWIO1-PY04-NC01 / Location salle de réunion pour Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 5,000.00 0.00 Canceled 2019-04-06 2019-06-01 2019-06-08 la réunion technique sur regional collaboration Quotations Envelope l'accord cadre SWIO1-PY05-NC05 / Organisation and logistic for a Under Component 1. Enhanced Request for Single Stage - One national workshop on IDA / H9950 Post Limited 100,243.00 0.00 Implementati 2020-07-27 2020-02-26 2020-09-21 2020-09-26 regional collaboration Quotations Envelope proposed fisheries bill for on Somalia SWIO1-PY05-NC02 / Location salle de réunion pour le "Regional Technical meeting on Framework Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 5,500.00 0.00 Canceled 2020-03-30 2020-05-25 2020-06-09 Agreement/ Sustainable regional collaboration Quotations Envelope Financing Mechanism and SWIOFC" et "SWIOFC Scientific Committee Meeting" (Madagascar) SWIO1-PY05-NC04 / Location salle de réunion pour le "SWIOFC Session & RCS" et Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 6,500.00 0.00 Canceled 2020-07-20 2020-09-14 2020-09-22 "Working Party on regional collaboration Quotations Envelope Collaboration and Cooperation on Tuna Fisheries" (Tanzania) SWIO1-PY05-NC01 / Location salle de réunion pour Component 1. Enhanced Request for Single Stage - One le Meeting on SWIOFC IDA / H9950 Post Limited 5,000.00 0.00 Canceled 2020-03-05 2020-04-30 2020-05-08 regional collaboration Quotations Envelope Working Group on Demersal Fish Stock Assessment (Cape Town) SWIO1-PY05-NC03 / Location salle de réunion pour le "Workshop for Eastern Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 1,500.00 0.00 Canceled 2020-06-07 2020-08-02 2020-08-09 Africa, Southern Africa and regional collaboration Quotations Envelope Indian Ocean (EA-SA-IO) - SADC" (Johannesburg) SWIO1-PY04-NC04 / Location de salle de réunion du Groupe de travail sur la Component 1. Enhanced Request for Single Stage - One IDA / H9950 Post Limited 3,000.00 0.00 Canceled 2019-07-09 2019-09-03 2019-09-10 collaboration et la coopération regional collaboration Quotations Envelope dans le secteur de la pêche thonière(Johannesburg) SWIO1-PY05-NC07 / Component 4. Project Recruitment of a movie maker IDA / H9950 management and Post Direct Selection Direct 60,000.00 0.00 Canceled 2020-10-30 2020-11-04 2020-12-09 2021-01-28 for SWIOFish1 project under coordination item communication SWIO1-PY06-NC01 / Pending Component 1. Enhanced Request for Single Stage - One translation of "SWIOFsih1 / IDA / H9950 Post Limited 4,000.00 0.00 Implementati 2021-06-02 2021-07-28 2021-08-12 regional collaboration Quotations Envelope SWIOFC documents" on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SWIO1-PY05-C014 / "Interpretation services for -Workshop for Eastern Africa, Southern Africa and Indian Consultant Component 1. Enhanced Under Ocean (EA-SA-IO) -SADC IDA / H9950 Post Qualification Open - International 7,800.00 0.00 2020-10-12 2020-10-09 2020-10-26 2020-11-24 2020-12-09 2021-01-13 2021-03-19 regional collaboration Implementation - SADC webinar on FiTI and Selection SWIOFC Scientific and technical meetings besides WPCCTF meeting" SWIO1-PY06-C004 / Consultant for Assessment Consultant Component 1. Enhanced and support for the IDA / H9950 Post Qualification Open - International 90,000.00 158,120.00 Signed 2020-12-15 2020-12-15 2021-01-05 2021-01-04 2021-02-18 2021-02-03 2021-03-20 2021-03-22 2021-04-24 2021-03-30 2021-08-22 regional collaboration implementation of MTC Selection guidelines SWIO1-PY06-C002 / Recruitment of a consultant for the Coordination of "the Component 1. Enhanced Non-Profit IDA / H9950 Post Direct 25,500.00 0.00 Canceled 2020-12-15 2020-12-14 2021-02-08 2021-03-15 2021-08-12 development of a catalogue regional collaboration Organizations on Fishing Gears and Methods in the SWIO region" Page 2 SWIO1-PY06-C006 / Consultant Component 1. Enhanced Under Interpretation service for the IDA / H9950 Post Qualification Open - National 14,766.00 0.00 2021-05-28 2021-06-21 2021-06-12 2021-06-24 2021-06-22 2021-07-07 2021-07-22 2021-08-31 regional collaboration Implementation SWIOFC meetings -July 2021 Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual MU-IOC-63361-CS-INDV / Component 1. Enhanced IDA / H9950 Post Consultant Limited 20,000.00 20,000.00 Signed 2018-03-16 2018-03-16 2018-03-26 2018-03-20 2018-05-10 2018-06-04 2018-06-10 2018-06-15 2018-09-08 Consultance (CPSOOI)/ NC regional collaboration Selection MU-IOC-62347-CS-INDV / Consultance sur l'analyse Individual Component 1. Enhanced coûts et bénéfices(SWIOFish 1 IDA / H9950 Post Consultant Limited 15,000.00 15,000.00 Signed 2018-04-20 2018-04-20 2018-04-25 2018-05-03 2018-05-30 2018-07-06 2018-07-04 2018-07-31 2018-08-13 regional collaboration framework agreement Selection merging with Fisheries Accord) 06102-PY03-C004 / Etude de consultant sur la contribution du secteur des Individual Component 1. Enhanced pêches au PIB cou-vrant les IDA / H9950 Post Consultant Open 40,000.00 40,040.00 Signed 2018-09-07 2018-09-13 2018-11-02 2019-01-08 2018-11-23 2019-02-01 2018-12-28 2019-02-04 2019-06-26 regional collaboration secteurs primaire et Selection secondaire dans les Etats membres de la CPSOOI Individual 06102-PY03-C010 / Component 1. Enhanced IDA / H9950 Post Consultant Open 20,000.00 18,025.00 Signed 2018-09-07 2018-09-13 2018-10-26 2019-02-26 2018-11-16 2019-08-12 2018-12-21 2019-08-19 2019-06-19 Rédacteur scientifique regional collaboration Selection 06102-PY03-C013 / Project Component 4. Project Individual Coordinateur (salary of the IDA / H9950 management and Post Consultant Direct 144,000.00 302,100.00 Signed 2018-10-02 2018-10-28 2018-10-12 2018-10-28 2018-11-02 2018-12-14 2018-12-07 2018-12-20 2019-06-05 Coordinator SWIOFish1) coordination Selection 06102-PY03-C014 / Component 4. Project Individual Procurement spécialist (salary IDA / H9950 management and Post Consultant Direct 28,632.00 33,035.00 Signed 2018-08-31 2018-08-31 2018-09-10 2018-08-31 2018-10-01 2018-08-31 2018-11-05 2018-08-31 2019-05-04 of the procurement specialist) coordination Selection 06102-PY03-C015 / Component 4. Project Individual Accout/Administratice IDA / H9950 management and Post Consultant Direct 9,530.00 28,590.00 Signed 2018-08-31 2018-08-28 2018-09-10 2018-08-30 2018-10-01 2018-09-25 2018-11-05 2018-09-28 2019-05-04 assistant (Salary of the coordination Selection account assistant) 06102-PY03-C006 / Service Individual d'interprétation pour la Component 1. Enhanced IDA / H9950 Post Consultant Limited 35,000.00 7,060.00 Signed 2018-02-01 2018-01-26 2018-02-16 2018-01-26 2018-03-23 2018-01-31 2018-04-27 2018-02-05 2018-10-24 réunion du programme regional collaboration Selection régional des observateurs SWIO1-PY04-C03 / Consultance pour l'assistance Individual Component 1. Enhanced spéciale à la Somalie en IDA / H9950 Post Consultant Open 60,000.00 0.00 Canceled 2019-01-31 2019-03-21 2019-04-11 2019-05-16 2019-11-12 regional collaboration matière de développement Selection juridique et institutionnel SWIO1-PY04-C06 / Selection of an International Consultant Component 1. Enhanced for Special assistance to IDA / H9950 Post Direct Selection Direct 40,000.00 0.00 Canceled 2019-04-05 2019-04-12 2019-04-15 2019-06-19 2019-09-17 regional collaboration Somalia on legal and institutional development SWIO1-PY04-C07 / Selection of a National Consultant for Individual Component 1. Enhanced Special assistance to Somalia IDA / H9950 Post Consultant Limited 20,000.00 34,294.16 Signed 2019-04-15 2019-05-23 2019-04-20 2019-10-11 2019-05-11 2019-10-16 2019-06-15 2019-11-21 2019-08-14 regional collaboration on legal and institutional Selection development. SWIO1-PY04-C08 / Recruitment of an Individual International Consultant for Component 1. Enhanced IDA / H9950 Post Consultant Limited 40,000.00 34,790.00 Signed 2019-05-10 2019-05-08 2019-05-15 2019-05-23 2019-06-05 2019-10-16 2019-07-10 2019-11-21 2019-09-08 Special assistance to Somalia regional collaboration Selection on legal and institutional development . SWIO1-PY04-C009 / Consultancy on Sustainable Individual Component 1. Enhanced SWIOFC Financing Mechanism IDA / H9950 Post Consultant Open 20,000.00 20,000.00 Signed 2019-05-28 2019-05-23 2019-07-16 2019-06-28 2019-08-06 2019-07-02 2019-09-10 2019-07-09 2019-11-09 regional collaboration and Policy Brief on possible Selection FFA SWIO1-PY05-C004 / Individual Component 1. Enhanced Consultant pour la redaction IDA / H9950 Post Consultant Direct 25,000.00 19,075.00 Signed 2020-03-19 2020-10-23 2020-03-29 2020-10-23 2020-04-19 2020-10-29 2020-05-24 2020-11-06 2021-03-20 regional collaboration scientifique Selection SWIO1-PY05-C005 / Consultant pour les traductions des documents de Individual Component 1. Enhanced Pending "Consultancy reports and IDA / H9950 Post Consultant Limited 10,000.00 0.00 2020-07-02 2020-07-07 2020-07-28 2020-09-01 2020-11-30 regional collaboration Implementation SWIOFC Scientific and Selection technical meetings besides WPCCTF meeting" SWIO1-PY05-C008 / Consultant pour Component 4. Project Individual "Administrative & Financial IDA / H9950 management and Post Consultant Direct 59,700.00 59,697.00 Signed 2020-05-13 2020-06-24 2020-05-23 2020-06-29 2020-06-13 2020-06-30 2020-07-18 2020-07-01 2021-09-11 Manager for SWIOFish1 coordination Selection Regional Project" SWIO1-PY04-C02 / Individual Consultance sur la Component 1. Enhanced IDA / H9950 Post Consultant Open 20,000.00 0.00 Canceled 2019-02-28 2020-01-09 2019-04-18 2019-05-09 2019-06-13 2019-08-12 transparence de l'industrie de regional collaboration Selection la pêche SWIO1-PY05-C009 / Individual Component 1. Enhanced Under Consultant Individuel pour la IDA / H9950 Post Consultant Limited 60,000.00 0.00 2020-01-07 2020-01-31 2020-01-12 2020-02-02 2020-03-08 2020-09-04 regional collaboration Implementation transparence de la Peche (FiTI) Selection Page 3 06102-PY03-C009 / Activité de consultant pour Individual l'élaboration de lignes Component 1. Enhanced IDA / H9950 Post Consultant Open 40,000.00 0.00 Canceled 2018-09-07 2018-09-13 2018-10-26 2018-11-16 2018-12-21 2019-06-19 directrices relatives à regional collaboration Selection l'évaluation de plans de gestion des pêcheries Component 4. Project Individual SWIO1-PY04-C005 / Aide IDA / H9950 management and Post Consultant Direct 20,000.00 0.00 Canceled 2019-06-20 2019-06-30 2019-07-21 2019-08-25 2020-08-24 comptable/administrative coordination Selection SWIO1-PY05-C013 / Consultant -Final Evaluation Component 4. Project Individual Report of the First South West IDA / H9950 management and Post Consultant Limited 50,000.00 38,000.00 Signed 2020-10-30 2020-12-28 2020-11-04 2021-01-11 2020-11-25 2021-03-01 2020-12-30 2021-03-01 2021-03-10 Indian Ocean Fisheries coordination Selection Governance and Shared Growth Project (SWIOFish1) SWIO1-PY05-C001 / Service d'interpretation pour deux Individual Component 1. Enhanced reunion a Madagascar IDA / H9950 Post Consultant Limited 12,500.00 0.00 Canceled 2020-03-20 2020-03-25 2020-04-15 2020-05-20 2020-05-22 regional collaboration WPCCTF et SWIOFC scientific Selection committee meeting SWIO1-PY05-C002 / Service d'interpretation pour la Individual réunion "SWIOFC Session & Component 1. Enhanced IDA / H9950 Post Consultant Limited 13,000.00 0.00 Canceled 2020-07-02 2020-07-07 2020-07-28 2020-09-01 2020-09-09 RCS" et "Working Party on regional collaboration Selection Collaboration and Cooperation on Tuna Fisheries" (Tanzania) SWIO1-PY05-C007 / Consultant pour l' Individual "Establishment of the Component 1. Enhanced IDA / H9950 Post Consultant Limited 20,000.00 0.00 Canceled 2020-05-06 2020-05-11 2020-06-01 2020-07-06 2020-10-04 mechanism for financing regional collaboration Selection agreements, accounts, operations" SWIO1-PY05-C015 / Consultant for a case study on Component 1. Enhanced IDA / H9950 Post Direct Selection Direct 15,000.00 19,250.00 Signed 2020-11-05 2020-11-12 2020-11-15 2020-11-16 2021-01-19 2021-01-15 2021-03-20 Fisheries Transparency regional collaboration Initiative for Madagascar SWIO1-PY05-C016 / IC to complete assignment for Special assistance to Somalia on legal and institutional development : Finalization of Component 1. Enhanced draft Bill and Explanatory IDA / H9950 Post Direct Selection Direct 30,000.00 22,500.00 Signed 2020-11-15 2020-11-12 2020-11-25 2020-11-19 2021-01-29 2020-11-24 2021-03-30 regional collaboration Notes and review of framework for Regulations ii) Preparation of Draft Regulations and Explanatory Notes, SWIO1-PY05-C006 / Consultant- Project Individual Component 1. Enhanced coordinator for the IDA / H9950 Post Consultant Limited 25,500.00 0.00 Canceled 2020-06-22 2020-06-15 2020-06-27 2020-07-18 2020-08-22 2021-02-18 regional collaboration development of a catalogue Selection on fishing gear SWIO1-PY05-C012 / Consultancy for horizontal harmonization of foreign Individual fishing licensing in the Component 1. Enhanced IDA / H9950 Post Consultant Limited 30,000.00 0.00 Canceled 2020-10-15 2020-10-20 2020-11-10 2020-12-15 2021-01-24 SWIOFC region in order to regional collaboration Selection implement MCS related Articles of the Voluntary MTC guidelines SWIO1-PY05-C010 / Consultant - mainland Individual Component 1. Enhanced /SWIOFC States for the IDA / H9950 Post Consultant Limited 31,725.00 0.00 Canceled 2020-06-22 2020-06-15 2020-06-27 2020-07-18 2020-08-22 2020-08-23 regional collaboration development of a catalogue Selection on fishing gears and methods SWIO1-PY05-C011 / Consultant Islands /SWIOFC Individual Component 1. Enhanced States for the development of IDA / H9950 Post Consultant Limited 31,725.00 0.00 Canceled 2020-06-22 2020-06-15 2020-06-27 2020-07-18 2020-08-22 2021-02-18 regional collaboration a catalogue on fishing gears Selection and methods SWIO1-PY04-C004 / Component 4. Project Individual Assistant en passation de IDA / H9950 management and Post Consultant Direct 29,900.00 0.00 Canceled 2019-09-11 2019-09-21 2019-10-12 2019-11-16 2020-11-15 Marché coordination Selection SWIO1-PY06-C008 / Graphic/designer consultant for regional Individual Component 1. Enhanced Pending visibility/communication IDA / H9950 Post Consultant Open 4,000.00 0.00 2021-06-28 2021-07-29 2021-08-02 2021-08-14 2021-08-29 regional collaboration Implementation (press, internet) on project Selection results/outputs and benefits accrued to SWIOFC members SWIO1-PY06-C007 / Individual Consultant for Technical and Component 1. Enhanced Pending IDA / H9950 Post Consultant Direct 18,000.00 0.00 2021-06-30 2021-07-10 2021-07-22 2021-07-31 2021-08-30 SCIENTIFIC EDITOR for regional collaboration Implementation Selection SWIOFC meetings Page 4 PROCUREMENT PLAN Country: Kingdom of Cambodia Full Project Name: ROAD CONNECTIVITY IMPROVMENT PROJECT Total Finance ($): USD 100 (US$M) Project Number: P169930 Project Implementation agency: MINISTRY OF PUBLIC WORKS AND TRANSPORT (MPWT) and MINISTRY RURAL DEVELOPMENT (MRD) Date of the Procurement Plan: 01 May 2020 Period covered by this Procurement Plan: 01 May 2020 to 01 November 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Government Standard Operating Procedures and Procurement Manual issued under Sub-Decree 74 (dated May 22, 2012), which is issued pursuant to Article 3 of the Kingdom of Cambodia’s Law on Public Procurement dated January 14, 2012. In addition to the provisions contained in the PM, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. i. Procurement shall be opened to eligible firms from any country. 1 ii. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, without limitation the World Bank’s right to sanction and the World Bank’s inspection and audit rights as per attached confirming application of, and compliance with, the World Bank’s Anti-Corruption Guidelines, including format. iii. Each project shall put in place an effective complaints review system that includes review by the implementing agency and subsequent review by another party not involved in the procurement process, if not satisfied with the review of the implementing agency. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). “Not Applicable” Other Relevant Procurement Information. The IA for this project has enough familiar experience with DP and WB funded procurement activities, and procurement capacity in carrying out the similar procurement activities under this project. 2 IMPLEMENTATATION OF THE ROAD CONNECTIVITY IMPROVMENT PROJECT (INTITIAL 18 MONTHS) No. Description Estimat Packa Prior Procurem Selection Evaluation Planned Comment ed ges Bank ent Methods Method Contract Cost Oversig Approach Start (US$) ht / Date in Competiti Million on Component 1- MPWT 48.67 Civil Works 44 1 C1-CW Package 1: NR7 (31km) 7.00 1 Prior Open Internation Most May 2021 Improvement/Periodical Internation al Advantageous Maintenance and Routine al RFB Bid Maintenance 2 C1-CW Package 2: NR73 (50km) 14.00 1 Prior Open Internation Most June 2021 Improvement/Periodical Internation al Advantageous Maintenance and Routine al RFB Bid Maintenance 3 C1-CW Package 3: PR377 & 23.00 1 Prior Open Internation Most Nov 2021 PR377A (51km) Internation al Advantageous Improvement/Periodical al RFB Bid Maintenance and Routine Maintenance Goods 0.17 4 Office Equipment 0.05 1 Post Open National Lowest Apr 2021 National RFQ Evaluation (Shopping) 5 Vehicles (3 pickup, one van) 0.12 1 Post Open National Lowest Apr 2021 Exclude Tax National RFB Evaluation Consultant Services 4.5 6 Consultant firm for Supervision 3.00 1 Prior Open QCBS Quality and Apr 2021 3 and Implementation Support of Internation Cost National & Provincial Roads al 7 Consultant firm for Road Crash 0.50 1 Post Open QCBS Quality and Dec 2021 Data Update & Capacity Internation Cost Building al 8 Road Safety Awareness & Road 0.30 1 Post Open CQS Quality Jan 2021 safety Assessment of MPWT Internation Project Roads al 9 Environment and Social 0.10 2 Post Open IC Individual Dec 2020 18 months consultant(s) Internation al 10 Technical Assistance on MPWT 0.06 1 Post Open IC Individual Oct 2021 24 months gender Mainstreaming Action National Plans 11 International OPBRS adviser 0.20 1 Post Open IC Individual May 2021 10 months internation (Intermitte al nt) 12 Local Procurement Expert 0.05 1 Post Open IC Individual Oct 2020 18 months National 13 International procurement 0.20 1 Prior Open IC Individual Oct 2020 10 months expert Internation (Intermitte al nt) 14 National Assistant Accountants 0.09 1 Post Open IC Individual Jan 2021 36 months National Component 2: Rural Roads 48.76 Improvement-MRD Civil works 44 1 C2-CW Package 1: Rural roads 23.00 1 Prior Open Internation Most Dec 2021 improvement and maintenance Internation al Advantageous through OPBRC in Kratie al RFB Bid province 2 C2-CW Package 2: Rural roads 11.00 1 Prior Open Internation Most Sep 2021 improvement and maintenance Internation al Advantageous through OPBRC in Kampong al RFB Bid Cham province 3 C2-CW Package 3: Rural roads 10.00 1 Prior Open Internation Most July 2021 improvement and maintenance Internation al Advantageous through OPBRC in Tboung al RFB Bid 4 Khmum Province Goods 0.26 4 Office Equipment 0.04 1 Post Open National Lowest Feb 2021 National RFQ Evaluation (Shopping) 5 IT Software 0.01 1 Post Open National Lowest Feb 2021 National RFQ Evaluation (Shopping) 6 Vehicles (6 pickup, 1 SUV) 0.21 1 Post Open National Lowest Mar 2021 National RFB Evaluation Consultant Services 4.50 7 Design and Supervision Services 3.00 1 Prior Open QCBS Quality and Dec 2020 for Rural Roads Internation Cost al 8 Consultant firm for Rural Roads 0.50 1 Post Open QCBS Quality and Aug 2021 Accessibility Financing Strategy Internation Cost and Support in al operationalization of the Rural Roads Asset Management Systems 9 Rural Roads Safety awareness 0.30 1 Post Open CQS Quality Feb 2021 activities and roads safety Internation assessment of project roads al 10 Safe transportation services in 0.10 1 Post Open CQS Quality May 2021 rural areas options study National 11 International Procurement 0.24 1 Post Open IC Individual Oct 2020 12 months Consultant Internation (intermitte al nt) 12 National Procurement 0.09 1 Post Open IC Individual Sep 2020 36 months Consultant National 13 Financial Management 0.09 1 Post Open IC Individual Jan 2021 36 months Consultants National 14 Monitoring & Evaluation 0.09 1 Post Open IC Individual Jan 2021 36 months Consultants National 15 Environmental and Social 0.09 1 Post Open IC Individual Jan 2021 36 months consultants National Total amount for MPWT and MRD 97.43 5 PROCUREMENT Cambodia : Cambodia Road Connectivity Improvement PLAN General Information Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2020-08-19 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169930 GPN Date: 2020-09-07 Project Name: Cambodia Road Connectivity Improvement Loan / Credit No: IDA / 67670 M Executing Agency(ies): inistry of Rural Development WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MRD-RCIP-FMS-GS5 / supply of one set of the latest version Component 2: Rural Roads Request for Single Stage - One (4 Users) of Sage 50 Premium IDA / 67670 Post Open - National 10,000.00 6,000.00 Signed 2020-11-28 2021-02-16 2021-01-23 2021-03-17 2022-01-23 Improvement Quotations Envelope accounting and related services. MRD-RCIP-SUV-GS7 / MRD plan to procure for 1 SUV vehicle through the direct contract with the UN agency Under Component 2: Rural Roads UN Agencies for the Road Connectivity IDA / 67670 Post Direct 40,310.00 0.00 Implementati 2021-02-08 2021-02-01 2021-02-13 2021-03-20 2021-09-16 Improvement (Direct) Improvement Project_RCIP. on The proposed cost is included the Manufacturing cost, UNOPS fee and Freight. MRD-RCIP-NCB-GS6 / Supply of 6 Units of Pickup Truck Vehicles. The procurement Under Component 2: Rural Roads Single Stage - One will conducted through NCB IDA / 67670 Post Request for Bids Open - National 180,000.00 0.00 Implementati 2021-02-15 2021-02-01 2021-02-20 2021-04-03 2021-05-03 2021-06-07 2021-12-04 Improvement Envelope Procedure specified in the on RGC's Procurement Manual for Externally Financed Projects. Pending MRD-RCIP-RFQ-GS11 / Component 2: Rural Roads Request for Single Stage - One IDA / 67670 Post Open - National 30,000.00 0.00 Implementati 2021-06-08 2021-08-03 2022-01-30 Office Equipment Supply Improvement Quotations Envelope on Pending MRD-RCIP-RFQ-GS12 / Component 2: Rural Roads Request for Single Stage - One IDA / 67670 Post Open - National 10,000.00 0.00 Implementati 2021-06-02 2021-07-21 2022-01-17 Office Furniture Supply Improvement Quotations Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MRD-RCIP-DSS-CS4 / The Consulting Firm will be responsible for confirmation of selected roads, design of climate resilient road Component 2: Rural Roads Quality And Cost- Under IDA / 67670 Prior Open - International 3,000,000.00 0.00 2020-10-22 2020-12-07 2020-11-12 2021-01-14 2020-12-26 2021-05-27 2021-01-23 2021-02-22 2021-03-29 2021-05-03 2022-05-03 rehabilitation, civil works Improvement Based Selection Implementation supervision, monitoring and contract administration regardings safeguard implementation. MRD-RCIP-RSA-CQS9 / Rural Road Safety Awareness activities and Roads safety assessment of project roads. Consultant Component 2: Rural Roads Pending MRD plans to procure a IDA / 67670 Post Qualification Open - International 300,000.00 0.00 2021-04-22 2021-05-13 2021-06-26 2021-07-26 2021-08-30 2022-02-26 Improvement Implementation consulting firm to perform Selection task of Rural Roads Safety awareness activities and roads safety assessment of RCIP. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MRD-RCIP-NPC-CS1 / NPC is Individual an individual consultant. The Component 2: Rural Roads IDA / 67670 Post Consultant Open 90,000.00 115,920.00 Signed 2020-08-11 2020-09-01 2020-09-13 2020-11-17 2020-09-27 2020-11-25 2020-10-25 2020-12-28 2022-10-15 contract duration is for 36 Improvement Selection months full time/intermittent. MRD-RCIP-IPC-CS2 / IPC is Individual contracted for 12 months Component 2: Rural Roads IDA / 67670 Post Consultant Open 240,000.00 240,000.00 Signed 2020-08-11 2020-11-19 2020-09-29 2021-02-01 2020-10-20 2021-02-22 2020-11-24 2021-03-15 2021-08-01 intermittent from the contract Improvement Selection signed date. Page 1 MRD-RCIP-FMC-CS3 / Individual FM specialist will be Individual recruited to work for Component 2: Rural Roads IDA / 67670 Post Consultant Open 90,000.00 2,700.00 Signed 2020-11-17 2020-11-17 2021-01-05 2020-12-30 2021-01-26 2020-12-31 2021-03-02 2021-01-05 2024-02-25 RCIP/MRD for 36 months for Improvement Selection full time/intermittent base from the contract signed date MRD-RCIP-ESC-CS8 / Individual Component 2: Rural Roads Under Environmental and Social IDA / 67670 Post Consultant Open 90,000.00 0.00 2021-03-26 2021-04-08 2021-05-14 2021-06-04 2021-06-25 2024-06-09 Improvement Implementation Consultant Selection MRD-RCIP-MNE-CS10 / Individual Component 2: Rural Roads Pending Monitoring & Evaluation IDA / 67670 Post Consultant Open 90,000.00 0.00 2021-06-17 2021-08-05 2021-08-26 2021-09-30 2024-09-14 Improvement Implementation Consultant (M&E) Selection Page 2 3 MONTHS PROCUREMENT PLAN Project information: P173820 - Kenya Covid-19 Emergency Response Project Implementation agency: Ministry of Health and Kenya Medical Supplies Agency Date of the Procurement Plan: March 25 2021 Period covered by this Procurement Plan: Three months Preamble In accordance with paragraph 5.9 of the World Bank’s Procurement Regulations for IPF Borrowers for Goods, Works, Non-Consulting and Consulting Services, dated July 1, 2016 (revised in November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: Paragraph 5.3 of the Procurement Regulations will not apply. When approaching the national market, the country’s own procurement procedures shall not be used due to restrictions on eligibility of otherwise eligible firms to participate in NCB. The Regulations will apply. However, the Borrower may use its own procurement arrangements as set forth in the Public Procurement and Disposal Act, 2003 Request for Quotation such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods : Applicable for those contracts identified in the Procurement Plan tables Works: applicable for those contracts identified in the Procurement Plan tables This being an emergency project, increased thresholds for Requests for Quotations (RFQ) to US$1 million for goods and services and US$5 million for works; Other Relevant Procurement Information:- Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Prior review Thresholds High Procurement Type Risk Works 5.0 Goods, It & Non-Consulting 1.5 Services Consultants (Firms) 0.5 Individual Consultants 0.2 Prequalification. Not expected for any works or goods packages in the procurement plan. Proposed Procedures for CDD Components: Applicable Reference to (if any) Project Operational/Procurement Manual: the CHERP team will prepare a Procurement manual, which will also be part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub- contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Kenya : KENYA COVID-19 HEALTH EMERGENCY RESPONSE PROJECT PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2020-04-09 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173820 GPN Date: 2020-04-08 Project Name: KENYA COVID-19 HEALTH EMERGENCY RESPONSE PROJECT Loan / Credit No: IDA / 65980 M Executing Agency(ies): inistry of Health WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-MOH-168125-CW-RFQ / Renovations of regional level ambulance command centres in 14 designated high risk Pending countiesthe renovations will Response, capacity building Request for Single Stage - One 2020-12- IDA / 65980 Post Limited 123,900.00 0.00 Implementat 2020-04-22 2020-06-17 be done in the following and training Quotations Envelope 14 ion counties: Nairobi, Mombasa, Kisumu, Kiambu, , Uasingishu, Kajiado, Machakos, Kakamega, Nakuru, Garissa, Wajir, Busia, KE-MOH-168121-CW-RFQ / Construction of 20 bed isolation units in level 5 hospitals in eastern, coast and North eastern regions:These Quarintine, isolation and Request for Single Stage - One 2020-12- IDA / 65980 Post Limited 1,792,000.00 0.00 Canceled 2020-04-22 2020-06-17 units will be constructed in treatement centres Quotations Envelope 14 the following level 5 Hospitals: Machakos, Mombasa, Makueni and Garissa Level 5 Hospitals KE-MOH-168116-CW-RFQ / Construction of 10 bed isolation units in level 4 facilities in western and Quarintine, isolation and Request for Single Stage - One 2020-12- IDA / 65980 Post Limited 1,960,000.00 0.00 Canceled 2020-04-22 2020-06-17 nyanza Regions: in Busia, treatement centres Quotations Envelope 14 Bungoma, Vihiga, Siaya, Migori, Homabay and Nyamira Counties KE-MOH-168118-CW-RFQ / Construction of 10 bed isolation units in 10 level 4 Hospitals in Rift valley region: Quarintine, isolation and Request for Single Stage - One 2020-12- in Bomet,Uasin gishu,West IDA / 65980 Post Limited 2,800,000.00 0.00 Canceled 2020-04-22 2020-06-17 treatement centres Quotations Envelope 14 Pokot, Turkana, Kericho, Narok, Nandi, Baringo, Elgeyo Marakwet and Kajiado Counties KE-MOH-168120-CW-RFQ / Construction of 20 bed isolation unit in level 5 Hospitals in Rift and western Quarintine, isolation and Request for Single Stage - One 2020-12- regions:These units will be IDA / 65980 Post Limited 1,792,000.00 0.00 Canceled 2020-04-22 2020-06-17 treatement centres Quotations Envelope 14 constructed in the following Level 5 hospitals: Kisii, Kisumu,Kakamega and Nakuru level 5 Hospitals KE-MOH-168119-CW-RFQ / Construction of 20 bed isolation units in 3 level 5 hospitals in central region and 3 National Referral Hospitals Quarintine, isolation and Request for Single Stage - One 2020-12- in Nairobi region: in Thika, IDA / 65980 Post Limited 3,136,000.00 0.00 Canceled 2020-04-22 2020-06-17 treatement centres Quotations Envelope 14 Meru ,Nyeri and Embu Level 5 Hospitals and Kenyatta National, Mbagathi IDU and Kenyatta Uni Referral Hospitals KE-MOH-168113-CW-RFQ / Construction of 10 bed isolation units in Level 4 Hospitals in Coast and North Quarintine, isolation and Request for Single Stage - One 2020-12- eastern regions: The units will IDA / 65980 Post Limited 2,240,000.00 0.00 Canceled 2020-04-22 2020-06-17 treatement centres Quotations Envelope 14 be constructed in Kwale, Kilifi, Lamu, Tana river, Wajir, Mandera, Taita Taveta and Kitui Counties KE-MOH-168117-CW-RFQ / Construction of 10 bed isolation units in 10 level 4 Hospitals in Central, Eastern and Nairobi Regions: in Quarintine, isolation and Request for Single Stage - One 2020-12- IDA / 65980 Post Limited 2,800,000.00 0.00 Canceled 2020-04-22 2020-06-17 Marsabit, Isiolo, Samburu, treatement centres Quotations Envelope 14 Laikipia, Nyandarua, Kirinyaga, Tharaka Nithi, Muranga,Kiambu and Nairobi counties. KE-MOH-168126-CW-RFB / Construction of National Response, capacity building Single Stage - One 2021-02- IDA / 65980 Post Request for Bids Open 6,900,000.00 0.00 Canceled 2020-04-17 2020-04-22 2020-06-03 2020-07-03 2020-08-07 Public Health Institute in and training Envelope 03 Nairobi KE-MOH-188956-CW-RFB / Renovation of infectious disease units at Mama Lucy Pending Kibaki Hospital and at Availability of safe blood and Single Stage - One 2021-05- IDA / 65980 Post Request for Bids Open - National 2,600,000.00 0.00 Implementat 2020-08-23 2020-08-28 2020-09-18 2020-10-18 2020-11-22 Kenyatta University teaching blood products Envelope 21 ion and Referal and Research Hospital (KUTRRH) and lady Northey Clinic Page 1 KE-MOH-188962-CW-RFQ / Pending Renovation of 3 regional Availability of safe blood and Request for Single Stage - One 2021-03- IDA / 65980 Post Limited 210,000.00 0.00 Implementat 2020-08-26 2020-09-18 blood centres: Kisii, Embu and blood products Quotations Envelope 17 ion Mombasa blood centres Pending KE-MOH-188964-CW-RFQ / Availability of safe blood and Request for Single Stage - One 2021-02- IDA / 65980 Post Limited 90,000.00 0.00 Implementat 2020-10-16 2020-11-18 Renovation of 6 cold rooms blood products Quotations Envelope 16 ion KE-MOH-196712-CW-RFQ / Proposed Medical Gases Pending Quarintine, isolation and Request for Single Stage - One 2021-03- Installation works at COVID- IDA / 65980 Post Limited 126,000.00 0.00 Implementat 2020-10-21 2020-12-09 treatement centres Quotations Envelope 09 19 Isolation Centre in ion Madalder Level 4 Hospital KE-MOH-196714-CW-RFQ / Proposed Medical Gases Installation works at COVID- Pending Quarintine, isolation and Request for Single Stage - One 2021-04- 19 Isolation Centres in IDA / 65980 Post Limited 235,000.00 0.00 Implementat 2020-11-27 2021-01-15 treatement centres Quotations Envelope 15 Lot 1. Kisumu Level 4 Hospital ion Lot 2. Langalanga Sub-county Hospital in Nakuru County KE-MOH-196704-CW-RFQ / Proposed Medical Gases Installation works at COVID- Pending 19 Isolation Centres: Quarintine, isolation and Request for Single Stage - One 2021-04- IDA / 65980 Post Limited 274,000.00 0.00 Implementat 2020-11-27 2021-01-15 Lot 1. Alupe Sub-County treatement centres Quotations Envelope 15 ion Hospital in Busia County Lot 2. Macalder Level 4 Hospital in Migori County KE-MOH-196713-CW-RFQ / Proposed Medical Gases Installation works at COVID- Pending 19 Isolation Centres: Quarintine, isolation and Request for Single Stage - One 2021-04- IDA / 65980 Post Limited 240,500.00 0.00 Implementat 2020-11-27 2021-01-15 Lot 1. Gede Health Centre in treatement centres Quotations Envelope 15 ion Kilifi County Lot 2. Msambweni Level 4 Hospital in Kwale County KE-MOH-196707-CW-RFQ / Proposed Medical Gases Installation works at COVID- 19 Isolation Centres: Pending Quarintine, isolation and Request for Single Stage - One 2021-04- Lot 1. Mwatate Level 4 IDA / 65980 Post Limited 194,000.00 0.00 Implementat 2020-11-27 2021-01-15 treatement centres Quotations Envelope 15 Hospital in Taita Taveta ion County Lot 2. Kauwi Level 4 Hospital in Kitui County KE-MOH-196711-CW-RFQ / Proposed Medical Gases Installation works at COVID- Pending 19 Isolation Centres: Quarintine, isolation and Request for Single Stage - One 2021-04- IDA / 65980 Post Limited 249,000.00 0.00 Implementat 2020-11-27 2021-01-15 Lot 1. Garissa Referral treatement centres Quotations Envelope 15 ion Hospital Lot 2. Kaimur Isolation Hospital in Mandera County KE-MOH-196710-CW-RFQ / Proposed Medical Gases Installation works at COVID- Pending 19 Isolation Centres: Quarintine, isolation and Request for Single Stage - One 2021-04- IDA / 65980 Post Limited 226,500.00 0.00 Implementat 2020-11-27 2021-01-15 Lot 1. Kangundo Level 4 treatement centres Quotations Envelope 15 ion Hospital in Machakos County Lot 2. Ngong Level 4 Hospital in Kajiado County KE-MOH-196904-CW-RFQ / Proposed Refurbishment of Pending Quarintine, isolation and Request for Single Stage - One 2021-04- Covid-19 Isolation facility at IDA / 65980 Post Limited 550,000.00 0.00 Implementat 2020-11-18 2020-12-30 treatement centres Quotations Envelope 29 Mama Lucy Kibaki Hospital, ion Nairobi County KE-MOH-216886-CW-RFQ / Proposed Renovation works at the Kenyatta University Teaching and Referral Pending Quarintine, isolation and Request for Single Stage - One 2021-06- Hospital to include Interior fit IDA / 65980 Post Limited 350,000.00 0.00 Implementat 2021-02-19 2021-03-24 treatement centres Quotations Envelope 22 outs for the Infectious Disease ion Unit (IDU) and Inclusion of Negative Pressure system at the IDU KE-MOH-227278-NC-DIR / Refurbishment of the Pending Community discussion and Request for Single Stage - One 2021-11- proposed 719 Call Centre IDA / 65980 Post Limited 150,000.00 0.00 Implementat 2021-04-11 2021-05-26 information outreach Quotations Envelope 22 Room in the Ministry of ion Health. KE-MOH-233744-CW-RFQ / Proposed Medical Gas Installation Works at Marimani Outreach Hospital - Request for Mombasa County (Lot Quotations - Small Pending Medical supplies and Request for Single Stage - One 2021-07- 1),Mtongwe Outreach hospital- IDA / 65980 Post Limited Works 432,000.00 0.00 Implementat 2021-05-17 2021-06-30 equipment Quotations Envelope 14 Mombasa County (Lot 2).Port (Emergency) SPD - ion Reitz Subcounty Hospital- Competitive Mombasa County (Lot 3) and Moi Voi Hospital -Taita Taveta county (Lot 4) KE-MOH-233865-CW-RFQ / Proposed Medical Gas Request for Installation works at Quotations - Small Pending Medical supplies and Request for Single Stage - One 2021-08- Chepyakwai Health Centre - IDA / 65980 Post Limited Works 160,000.00 0.00 Implementat 2021-05-19 2021-06-28 equipment Quotations Envelope 20 Uasin Gishu County (Lot 1) (Emergency) SPD - ion and Kamalel Isolation Centre- Competitive Uasin Gishu County (Lot 2) Page 2 KE-MOH-233867-CW-RFQ / Proposed Medical Gas Request for Installation Work at Moiben Quotations - Small Pending Medical supplies and Request for Single Stage - One 2021-07- Sub Hospital-Uasin Gishu IDA / 65980 Post Limited Works 216,000.00 0.00 Implementat 2021-05-16 2021-06-08 equipment Quotations Envelope 16 County( Lot 1) and Kericho (Emergency) SPD - ion County Referral Hospital- Competitive Kericho County( Lot 2) KE-MOH-233868-CW-RFQ / Request for Proposed medical Gas Quotations - Small Pending Installation works at Pumwani Medical supplies and Request for Single Stage - One 2022-01- IDA / 65980 Post Limited Works 216,000.00 0.00 Implementat 2021-05-18 2021-07-05 Hospital - Nairobi County (Lot equipment Quotations Envelope 01 (Emergency) SPD - ion 1) and Kitui County Hospital ( Competitive Lot2) KE-MOH-233869-CW-RFQ / Request for Proposed Medical Gas Quotations - Small Pending Medical supplies and Request for Single Stage - One 2021-09- installation works at Nakuru IDA / 65980 Post Limited Works 225,000.00 0.00 Implementat 2021-05-20 2021-07-21 equipment Quotations Envelope 16 Level 5 Hospital in Nakuru (Emergency) SPD - ion County. Competitive GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOH-168069-GO-UN / Procure assorted Lab Personal Protective Equipment, Pending Assorted emergency ICU Medical supplies and UN Agencies IDA / 65980 Post Direct 985,175.00 0.00 Implementati 2020-04-20 2020-04-25 2020-05-30 2020-11-26 equipment, supplies and equipment (Direct) on consumables Assorted Lab equipment and Lab supplies KE-MOH-168095-GO-RFQ / Printing and distribution of Pending assorted surveillance , SOP Response, capacity building Request for Single Stage - One IDA / 65980 Post Limited 150,000.00 0.00 Implementati 2020-04-19 2020-06-14 2020-12-11 and data collection tools"4000 and training Quotations Envelope on No. MOH 502, 2000 No. MOH 503 and 10000 No. MOH 505 KE-MOH-168128-GO-RFQ / Print and distribute 250000 Pending Community discussion and Request for Single Stage - One No. A4 size pamphlets, IDA / 65980 Post Limited 234,000.00 0.00 Implementati 2020-04-22 2020-06-17 2020-12-14 information outreach Quotations Envelope 100000 No. A2 posters and on 100 Roll up banners KE-MOH-00001-GO-DIR / Procure 250 No. Gradian Medical supplies and IDA / 65980 Prior Direct Selection Direct 4,000,000.00 1,600,000.00 Signed 2020-03-27 2020-04-27 2020-03-27 2020-05-19 2020-03-30 2020-03-30 2020-12-31 Comprehensive Critical Care equipment ventillators Pending KE-MOH-168074-GO-DIR / Response, capacity building IDA / 65980 Post Direct Selection Direct 150,000.00 0.00 Implementati 2020-04-20 2020-04-25 2020-05-30 2020-11-26 Procure 3000 mobile phones and training on KE-MOH-173622-GO-RFQ / Response, capacity building Request for Single Stage - One Tablet for case management, IDA / 65980 Post Limited 24,750.00 22,142.52 Signed 2020-05-30 2020-05-28 2020-07-25 2020-06-08 2021-01-21 and training Quotations Envelope 75 No KE-MOH-173494-GO-RFQ / procurement of 2 fireproof Project implementation and Request for Single Stage - One IDA / 65980 Post Limited 5,600.00 19,769.48 Completed 2020-06-01 2020-05-28 2020-07-27 2020-06-08 2021-01-23 2020-06-30 cabinets, 2 microwave, 2 monitoring Quotations Envelope water dispensers, 1 fridge KE-MOH-173502-GO-RFQ / Procurement of 11 laptops, 1 LCD projector, 11 mobile Response, capacity building Request for Single Stage - One phones, 1 colour multi- IDA / 65980 Post Limited 27,700.00 26,777.78 Signed 2020-06-02 2020-05-28 2020-07-28 2020-06-08 2021-01-24 and training Quotations Envelope functional printer ,1 b/w light duty printer, 2 wifi routers, 10 modems KE-MOH-173541-GO-RFQ / procurement of furniture as follows: , 2 office desks, 1 Pending executive table , 2 executive Project implementation and Request for Single Stage - One IDA / 65980 Post Limited 15,700.00 0.00 Implementati 2020-06-01 2020-07-27 2021-01-23 chair high back orthopedic, 1 monitoring Quotations Envelope on secretarial chair, 4 visitors chairs, 9 executive chair high back swivel KE-MOH-175673-GO-DIR / Procurement of 15 heavy duty Response, capacity building IDA / 65980 Post Direct Selection Direct 1,020,000.00 797,272.69 Signed 2020-05-27 2020-05-19 2020-06-01 2020-06-04 2020-07-06 2020-06-08 2021-01-02 double cabin vehicle, and 1 and training heavy duty passenger vehicle KE-MOH-173607-GO-DIR / Airtime for 2125 community health extension workers for Pending Project implementation and 3 months @KES 2000 per IDA / 65980 Post Direct Selection Direct 129,150.00 0.00 Implementati 2020-05-28 2020-06-02 2020-07-07 2021-01-03 monitoring month, Airtime for 11 project on personnel for 3 months@ KES 5000 per month KE-MOH-173609-GO-RFQ / Quarintine, isolation and Request for Single Stage - One Procurement of 1840 No. IDA / 65980 Post Limited 147,200.00 0.00 Canceled 2020-06-02 2020-06-09 2020-07-28 2021-01-24 treatement centres Quotations Envelope Thermoguns KE-MOH-168100-GO-RFQ / Print and distribute guidelines, booklets, modules Pending Response, capacity building Request for Single Stage - One and forms: 2000 contact IDA / 65980 Post Limited 75,000.00 0.00 Implementati 2020-06-05 2020-07-31 2021-01-27 and training Quotations Envelope tracing forms, 2000 No. case on investigation forms and training modules Page 3 KE-MOH-178412-GO-RFQ / Procure assorted items to set up grievance hotline: 1.No. Grievance Redress Mechanism Pending Software, 1 No. 4 way work Project implementation and Request for Single Stage - One IDA / 65980 Post Limited 12,500.00 0.00 Implementati 2020-06-10 2020-06-24 2020-12-21 station, 4 No. Desktop monitoring Quotations Envelope on computers, 1 No. Medium duty 3-in -1 printer, 3 No. Telephone handsets and 2 No. mobile phone KE-MOH-182114-GO-RFQ / Pending Procurement of 5 No. Laptop Project implementation and Request for Single Stage - One IDA / 65980 Post Limited 9,500.00 0.00 Implementati 2020-07-02 2020-07-21 2021-01-17 computers and 5 No. mobile monitoring Quotations Envelope on Phones KE-MOH-173603-GO-RFQ / Pending procurement of 368 hand Medical supplies and Request for Single Stage - One IDA / 65980 Post Limited 552,000.00 0.00 Implementati 2020-06-08 2020-08-03 2021-01-30 washing stations and equipment Quotations Envelope on accessories KE-MOH-184648-GO-RFQ / Printing of 500 copies of Grievance Redress Mechanism one pager,1000 copies of Gender Based Violence/SEA Pending Project implementation and Request for Single Stage - One one pager,1000 copies of IDA / 65980 Post Limited 7,700.00 0.00 Implementati 2020-07-20 2020-07-28 2020-10-30 monitoring Quotations Envelope Abbreviated Code of Conduct, on 200 copies of Grievance Redress Mechanism Register Log and 1000 copies of Patient feedback form KE-MOH-188957-GO-RFQ / Pending Printing of 38,286 copies of Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 111,852.00 0.00 Implementati 2020-08-28 2020-09-18 2020-12-23 booklets, forms,charts, blood products Quotations Envelope on Registers and reporting tools KE-MOH-188960-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procure 144 blood donor IDA / 65980 Post Limited 100,800.00 0.00 Implementati 2020-08-26 2020-09-25 2021-03-24 blood products Quotations Envelope coaches on KE-MOH-189116-GO-RFQ / Pending Procurement of 140,000 Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 142,800.00 0.00 Implementati 2020-08-29 2020-10-24 2021-04-22 Haemoglobin estimation blood products Quotations Envelope on cuvettes KE-MOH-189120-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procurement of 3,000 IDA / 65980 Post Limited 24,000.00 0.00 Implementati 2020-08-30 2020-10-25 2021-04-23 blood products Quotations Envelope Quadruple blood bags on KE-MOH-189122-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procurement of 10,000 IDA / 65980 Post Limited 60,000.00 0.00 Implementati 2020-08-30 2020-10-25 2021-04-23 blood products Quotations Envelope Tripple Blood Bags on KE-MOH-189123-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procurement of 12,000 IDA / 65980 Post Limited 60,000.00 0.00 Implementati 2020-08-30 2020-10-25 2021-04-23 blood products Quotations Envelope Double Blood Bags on KE-MOH-189126-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procurement of 2,500 Single IDA / 65980 Post Limited 7,500.00 0.00 Implementati 2020-08-30 2020-10-25 2021-04-23 blood products Quotations Envelope Blood Bags on KE-MOH-189129-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procurement of 2,500 IDA / 65980 Post Limited 17,500.00 0.00 Implementati 2020-08-30 2020-10-25 2021-04-23 blood products Quotations Envelope Paediatric Blood bags on KE-MOH-188959-GO-RFQ / Pending Procure 2 refrigerated vehicles Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 180,000.00 0.00 Implementati 2020-10-20 2021-03-02 2021-02-18 for ferring large amounts of blood products Quotations Envelope on blood KE-MOH-189103-GO-DIR / Procurement of 21,000 TTI Pending Availability of safe blood and screening reagents Murex for IDA / 65980 Post Direct Selection Direct 105,000.00 0.00 Implementati 2020-09-27 2020-10-02 2020-10-28 2020-11-27 blood products Etimax machines in all the 6 on regional testing sites KE-MOH-189093-GO-DIR / Pending Procurement of 54,000 TTI Availability of safe blood and IDA / 65980 Post Direct Selection Direct 594,000.00 0.00 Implementati 2020-09-27 2020-10-02 2020-10-28 2020-11-27 Screening reagents Liaison for blood products on Liasion Equipment KE-MOH-189110-GO-DIR / Procurement of 66,000 Blood Pending Availability of safe blood and Grouping reagents Qwalys for IDA / 65980 Post Direct Selection Direct 264,000.00 0.00 Implementati 2020-09-27 2020-10-02 2020-10-28 2020-11-27 blood products Blood Grouping machines in on Embu and Nakuru KE-MOH-189091-GO-DIR / Pending Procure 54,000 Abbot Availability of safe blood and IDA / 65980 Post Direct Selection Direct 648,000.00 0.00 Implementati 2020-09-27 2020-10-02 2020-10-28 2020-11-27 Reagents Testing Kits for blood products on Abbot Equipment KE-MOH-176216-GO-RFB / Pending PROVISION OF 24-HOUR Medical supplies and Single Stage - One IDA / 65980 Post Request for Bids Open - National 486,000.00 0.00 Implementati 2020-09-24 2020-09-24 2020-10-07 2020-10-14 2020-11-11 2021-05-10 STANDBY AMBULANCE equipment Envelope on SERVICES FOR 6 MONTHS KE-MOH-196696-GO-RFQ / Pending Procurement of assorted Medical supplies and Request for Single Stage - One IDA / 65980 Post Limited 33,600.00 0.00 Implementati 2020-10-12 2020-11-06 2020-12-04 Furniture for use in Mama equipment Quotations Envelope on Lucy Hospital KE-MOH-196698-GO-RFQ / Pending Medical supplies and Request for Single Stage - One Procurement of ICT IDA / 65980 Post Limited 28,000.00 0.00 Implementati 2020-10-09 2020-11-11 2020-12-11 equipment Quotations Envelope equipment for use in Mama on Lucy Hospital KE-MOH-196699-GO-RFQ / Pending Procurement of Laundry Medical supplies and Request for Single Stage - One IDA / 65980 Post Limited 180,000.00 0.00 Implementati 2020-10-12 2020-11-30 2020-12-30 equipment for use in Mama equipment Quotations Envelope on Lucy Hospital Page 4 KE-MOH-189135-GO-RFQ / Pending Procurement of 6 Hematology Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 93,600.00 0.00 Implementati 2020-11-27 2020-12-13 2021-01-22 analyzer and 72 Hematology blood products Quotations Envelope on analyzer kits KE-MOH-196868-GO-RFQ / Procurement of blood collection and processing Pending equipment as follows: Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 584,700.00 0.00 Implementati 2020-11-13 2021-01-01 2021-04-01 1. 15 manual component blood products Quotations Envelope on separator 2. 18 automated component expressor/extractor KE-MOH-196697-GO-RFQ / Procure 100 Pillows with covers, 200 Blankets, 200 Pending pairs of bed sheets (large), Medical supplies and Request for Single Stage - One IDA / 65980 Post Limited 26,500.00 0.00 Implementati 2020-11-11 2020-12-13 2021-01-10 200 Draw sheets, 40 window equipment Quotations Envelope on curtain rails and 40 hospital window curtains for Mama Lucy Hospital KE-MOH-189013-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procure 20 backup diesel IDA / 65980 Post Limited 950,000.00 0.00 Implementati 2020-11-22 2020-12-21 2021-03-22 blood products Quotations Envelope generators 10-12 KVA on KE-MOH-189113-GO-DIR / Procurement of 102,000 Pending Availability of safe blood and blood grouping reagents IDA / 65980 Post Direct Selection Direct 601,800.00 0.00 Implementati 2020-11-06 2020-11-11 2020-11-24 2020-12-24 blood products Immucore for six regional on testing centres KE-MOH-200443-GO-RFQ / Procurement of assorted Pending blood processing equipment Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 260,700.00 0.00 Implementati 2020-11-14 2020-12-19 2021-03-19 broken down as follows: blood products Quotations Envelope on 1. 35 Tube Sealer 2. 155 Tube Strippers KE-MOH-200449-GO-RFQ / Procurement of Pending Availability of safe blood and Request for Single Stage - One 1. 8 refrigerated centrifuges IDA / 65980 Post Limited 571,550.00 0.00 Implementati 2020-11-20 2021-01-01 2021-04-01 blood products Quotations Envelope 2. 8 platelet agitators on 3. 33 blood weighing scales KE-MOH-200457-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procurement of 800 Apheresis IDA / 65980 Post Limited 280,000.00 0.00 Implementati 2020-11-09 2020-12-21 2021-03-21 blood products Quotations Envelope kits on KE-MOH-201450-GO-RFQ / Pending Medical supplies and Request for Single Stage - One Procurement of a Public IDA / 65980 Post Limited 15,000.00 0.00 Implementati 2020-11-20 2020-12-29 2021-01-29 equipment Quotations Envelope Address System on KE-MOH-196873-GO-RFQ / Procurement of assorted Blood cold chain broken down as follows: Pending Availability of safe blood and Request for Single Stage - One 1. 8 blood bank refrigerators IDA / 65980 Post Limited 565,500.00 0.00 Implementati 2020-11-13 2021-01-01 2021-04-01 blood products Quotations Envelope 2. 8 blood bank freezers on 3. 1 bio bank 4. 231 blood transportation boxes KE-MOH-188958-GO-DIR / Procure 10 customized 7 Pending seater passenger vans Availability of safe blood and IDA / 65980 Post Direct Selection Direct 700,000.00 0.00 Implementati 2020-11-29 2020-12-04 2020-12-19 2021-01-18 separate compartment for blood products on commodities and blood bags with overhead carrier KE-MOH-204854-GO-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procurement of Blood cold IDA / 65980 Post Limited 150,000.00 0.00 Implementati 2020-12-05 2021-01-05 2021-02-04 blood products Quotations Envelope rooms on KE-MOH-203440-GO-RFQ / Procurement of parts to Pending Availability of safe blood and Request for Single Stage - One enable repair of equipment at IDA / 65980 Post Limited 15,000.00 0.00 Implementati 2021-01-22 2021-02-22 2021-04-23 blood products Quotations Envelope the Kenya National Blood on Transfusion by the Engineer KE-MOH-189012-GO-RFQ / Supply and Installation of No. 40 Air conditioners (18 BTU) Pending Availability of safe blood and Request for Single Stage - One to be installed in the various IDA / 65980 Post Limited 80,000.00 0.00 Implementati 2021-02-07 2021-03-18 2021-09-14 blood products Quotations Envelope Kenya National Blood on Transfusion Centres countrywide KE-MOH-196881-GO-RFQ / Procurement of assorted Temperature monitors broken down as follows: Pending 1. 78 remote temperature Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 112,200.00 0.00 Implementati 2021-02-08 2021-03-29 2021-06-27 monitor fitted on static cold blood products Quotations Envelope on chain equipment 2. 144 remote temperature monitor fitted on mobile cold chain equipment KE-MOH-215327-GO-RFQ / Procurement of 100 No. Pending High flow nasal cannulas Medical supplies and Request for Single Stage - One IDA / 65980 Post Limited 800,000.00 0.00 Implementati 2021-02-10 2021-03-24 2021-06-22 required during oxygen equipment Quotations Envelope on therapy for critically ill patients including COVID-19 patients KE-MOH-216887-GO-RFQ / Procurement of Furniture for Pending Quarintine, isolation and Request for Single Stage - One use at the Kenyatta University IDA / 65980 Post Limited 47,000.00 0.00 Implementati 2021-02-14 2021-03-26 2021-05-25 treatement centres Quotations Envelope Teaching and Referral on Hospital Isolation Facility Page 5 KE-MOH-226662-GO-RFQ / Pending Procure 2 No laptops ,2 No Project implementation and Request for Single Stage - One IDA / 65980 Post Limited 4,000.00 0.00 Implementati 2021-04-10 2021-05-29 2021-06-28 Modems and 2 No Mobile monitoring Quotations Envelope on phones KE-MOH-227263-GO-RFQ / Pending Supply, Delivery, Installation Community discussion and Request for Single Stage - One IDA / 65980 Post Limited 93,600.00 0.00 Implementati 2021-04-13 2021-06-08 2021-12-05 of hardware and networking information outreach Quotations Envelope on for the Call Centre KE-MOH-229145-GO-DIR / Supply, Delivery ,Installation Pending Medical supplies and of two (2 No) 20,000 liter IDA / 65980 Post Direct Selection Direct 500,000.00 0.00 Implementati 2021-04-13 2021-04-15 2021-04-28 2021-06-08 equipment Bulk Oxygen tank and on Accessories KE-MOH-229791-GO-RFQ / Supply and Delivery of Pending Medical supplies and Request for Single Stage - One Personal Protective IDA / 65980 Post Limited 426,821.00 0.00 Implementati 2021-04-22 2021-04-28 2021-05-11 equipment Quotations Envelope Equipment's for the COVID- on 19 testing laboratories KE-MOH-229861-GO-RFQ / Supply and Delivery of 2,070 Pending pieces of 500 ml Sanitizers Medical supplies and Request for Single Stage - One IDA / 65980 Post Limited 13,747.00 0.00 Implementati 2021-04-26 2021-05-31 2021-06-07 and 42 (No)pack of 100 equipment Quotations Envelope on Biohazard Bags for COVID - 19 Testing Laboratories KE-MOH-233863-GO-DIR / Supply and Delivery of bulk 20,000 liters of cryogenic liquid medical Oxygen in KNH Pending Mbagathi Hospital and bulk Medical supplies and IDA / 65980 Post Direct Selection Direct 1,440,000.00 0.00 Implementati 2021-05-13 2021-05-18 2021-06-22 2022-03-23 20,000 liters of cryogenic equipment on liquid medical Oxygen in Kenyatta University Teaching and Referral Hospital for 24 times in each Hospital. KE-MOH-235971-GO-DIR / Supply, Delivery Installation and commissioning of a Pending 10,000 liter liquid Oxygen Medical supplies and IDA / 65980 Post Direct Selection Direct 490,000.00 0.00 Implementati 2021-05-26 2021-05-31 2021-07-05 2022-05-31 tank (1 No) and supply of equipment on Medical Oxygen for one year (24 times) in Nakuru Level 5 Hospital -Nakuru County KE-MOH-235998-GO-DIR / Supply, Delivery ,Installation and commissioning of a 8,000 Pending liter liquid Oxygen tank (1 No) Medical supplies and IDA / 65980 Post Direct Selection Direct 408,000.00 0.00 Implementati 2021-05-26 2021-05-31 2021-07-05 2022-05-31 and supply of Medical Oxygen equipment on for one year (24 times) in Kericho County Referral Hospital-Kericho County KE-MOH-236003-GO-DIR / Supply, Delivery, Installation and commissioning of a 6 ,000 liter liquid Oxygen tank Pending Medical supplies and (1 No) and supply of Medical IDA / 65980 Post Direct Selection Direct 316,000.00 0.00 Implementati 2021-05-26 2021-05-31 2021-06-23 2022-06-29 equipment Oxygen for one year (24 on times) in Pumwani Hospital - Nairobi County as per specifications. KE-MOH-235999-GO-DIR / Supply, Delivery Installation and commissioning of a 8,000 Pending Medical supplies and liter liquid Oxygen tank (1 No) IDA / 65980 Post Direct Selection Direct 408,000.00 0.00 Implementati 2021-05-31 2021-06-05 2021-07-10 2022-06-29 equipment and supply of Medical Oxygen on for one year (24 times) in Kitui County Hospital-Kitui County KE-MOH-240389-GO-DIR / Supply and Delivery of 384 units of Medical Air in 7,600 Pending Medical supplies and litre cylinder at Moiben Sub IDA / 65980 Post Direct Selection Direct 12,288.00 0.00 Implementati 2021-06-25 2021-06-30 2021-08-04 2022-01-31 equipment Hospital -Uasin Gishu County on (Lot 1) and Kericho County Referral Hospital (Lot 2) KE-MOH-240474-GO-RFQ / Procure Spare parts for repairs Pending of various cold chain Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 43,750.00 0.00 Implementati 2021-06-27 2021-08-12 2022-02-08 equipment and servicing tools blood products Quotations Envelope on for Kenya National Blood Transfusion services NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOH-168078-NC-RFQ / Development of a platform for Event based surveillance at Response, capacity building IDA / 65980 Post Direct Selection Direct 40,000.00 0.00 Canceled 2020-04-17 2020-04-22 2020-05-27 2020-11-23 the facilities and Community and training based surveillance at the community level KE-MOH-185606-NC-RFB / PROVISION OF 24 HOUR STAND BY AMBULANCE Pending SERVICE: 16 AMBULANCES(6 Response, capacity building Single Stage - One IDA / 65980 Post Request for Bids Open - National 1,752,000.00 0.00 Implementati 2020-07-28 2020-08-02 2020-08-12 2020-08-19 2020-09-03 2021-03-02 ADVANCED CARDIAC LIFE and training Envelope on SUPPORT & 10 BASIC LIFE SUPPORT) FOR A PERIOD OF 1 YEAR(365 DAYS) Page 6 KE-MOH-189139-NC-DIR / Procurement of Courier Services to transport blood Pending samples, components, Availability of safe blood and IDA / 65980 Post Direct Selection Direct 198,000.00 0.00 Implementati 2020-08-26 2020-08-31 2020-10-05 2021-04-03 supplies and other documents blood products on from the National Blood Transfusion centre to the other parts of the country. KE-MOH-204853-NC-RFQ / Pending Availability of safe blood and Request for Single Stage - One Procurement of a Quality IDA / 65980 Post Limited 25,000.00 0.00 Implementati 2020-12-05 2021-01-05 2021-02-04 blood products Quotations Envelope Assurance Scheme on KE-MOH-212377-NC-RFQ / Pending Repair of Cold Rooms in the Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 200,000.00 0.00 Implementati 2021-01-25 2021-02-26 2021-05-27 Kenya National Blood blood products Quotations Envelope on Transfusion centres KE-MOH-212369-NC-RFQ / Pending Repair of Incinerators in the Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 80,000.00 0.00 Implementati 2021-01-27 2021-02-26 2021-05-27 Kenya National Blood blood products Quotations Envelope on Transfusion Centres KE-MOH-212379-NC-RFQ / Pending Repair of Generators at the Availability of safe blood and Request for Single Stage - One IDA / 65980 Post Limited 10,500.00 0.00 Implementati 2021-01-24 2021-02-26 2021-05-27 Kenya National Blood blood products Quotations Envelope on Transfusion Centres KE-MOH-215334-NC-DIR / Provision of 24-Hour ten (No. 10) Standby Ambulance Pending Response, capacity building Service for 6 Months from M/S IDA / 65980 Post Direct Selection Direct 570,000.00 0.00 Implementati 2021-02-04 2021-02-11 2021-03-16 2021-06-14 and training Emergency Plus Medical on Services of P.O Box 40712 – 00100 Nairobi CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOH-224950-CS-CQS / Procurement of Consultant Communication Consultancy Community discussion and Under IDA / 65980 Post Qualification Limited 750,000.00 0.00 2021-03-24 2021-03-24 2021-03-31 2021-04-14 2021-05-12 2022-05-11 Firm for the Kenya Covid-19 information outreach Implementation Selection Health Emergency Response Project INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOH-173617-CS-INDV / Hire of 50 temporary staff for Individual Response, capacity building Under call centre @ USD 1000 per IDA / 65980 Post Consultant Limited 150,000.00 0.00 2020-05-29 2020-04-26 2020-06-03 2020-05-26 2020-06-24 2020-05-26 2020-07-29 2021-01-25 and training Implementation person per month for three Selection months renewable monthly KE-MOH-173610-CS-INDV / Individual Community discussion and Pending Consultancy for IDA / 65980 Post Consultant Limited 36,000.00 0.00 2020-06-01 2020-06-06 2020-06-27 2020-08-01 2021-01-28 information outreach Implementation communication specialist Selection KE-MOH-176220-CS-INDV / procurement of 55 Lab Individual technologists to be deployed Response, capacity building Pending IDA / 65980 Post Consultant Limited 123,750.00 0.00 2020-05-29 2020-06-03 2020-06-24 2020-07-29 2021-01-25 at 11 facilities for and training Implementation Selection coordination of lab activities for three months KE-MOH-180881-CS-INDV / Temporary employment of Point of EntryHealth workers Individual Response, capacity building Pending as follows; 15 Public Health IDA / 65980 Post Consultant Limited 112,500.00 0.00 2020-06-23 2020-06-25 2020-06-29 2020-07-07 2021-01-03 and training Implementation officers, 4 Clinical officers and Selection 6 Nurses on 6 month contract basis KE-MOH-181249-CS-INDV / Employment of 55 Psychologists on a temporary Individual Response, capacity building Pending basis on renewable contract IDA / 65980 Post Consultant Limited 131,250.00 0.00 2020-06-23 2020-06-28 2020-07-02 2020-07-17 2021-01-13 and training Implementation for 3 months as follows: 45 Selection assistants Psychologists and 10 senior psychologists KE-MOH-178671-CS-CQS / Hire a consultant to undertake Environmental Impact Assessment on sites for Under installation of 16 incineratos IDA / 65980 Medical waste disposal Post Direct Selection Direct 100,000.00 0.00 2020-06-23 2020-08-07 2020-06-29 2020-07-21 2021-01-17 Implementation for additional tratment facilities in high priority areas and sites forincinerators for 6 specialised laboratories KE-MOH-181245-CS-INDV / Employ Consultant to extract and document the lessons Individual Project implementation and Pending learned and best practices in IDA / 65980 Post Consultant Limited 10,000.00 0.00 2020-06-23 2020-06-24 2020-06-30 2020-08-04 2021-01-31 monitoring Implementation Kenya’s experience in the Selection response to the COVID-19 pandemic KE-MOH-181250-CS-INDV / Employ a Consultant to do a Individual Response, capacity building Pending rapid assessment on the IDA / 65980 Post Consultant Limited 14,000.00 0.00 2020-06-23 2020-06-24 2020-06-30 2020-07-15 2021-01-11 and training Implementation status of Counties to respond Selection to the COVID-19 pandemic Page 7 KE-MOH-196780-CS-INDV / Employment of twenty six Individual Response, capacity building Pending (No. 26) doctors to be paid on IDA / 65980 Post Consultant Limited 187,200.00 0.00 2020-10-05 2020-10-09 2020-10-16 2020-11-13 2020-12-14 and training Implementation a monthly basis for a period Selection of six months KE-MOH-196794-CS-INDV / Employment of Healthcare Individual Workers: Ten (No. 10) Response, capacity building Pending IDA / 65980 Post Consultant Limited 45,000.00 0.00 2020-11-15 2020-11-15 2020-11-22 2020-12-20 2021-01-19 Nutritionists to be paid on a and training Implementation Selection monthly basis for a period of six months KE-MOH-196800-CS-INDV / Employment of Healthcare Individual Workers: Ten (No. 10) Response, capacity building Pending IDA / 65980 Post Consultant Limited 45,000.00 0.00 2020-11-15 2020-11-20 2020-11-27 2020-12-25 2021-01-24 psychologists to be paid on a and training Implementation Selection monthly basis for a period of six months KE-MOH-196790-CS-INDV / Employment of Healthcare Individual Workers: Ten (No. 10) Response, capacity building Pending IDA / 65980 Post Consultant Limited 45,000.00 0.00 2020-11-15 2020-11-18 2020-11-25 2020-12-23 2021-01-22 physiotherapists to be paid on and training Implementation Selection a monthly basis for a period of six months KE-MOH-196770-CS-INDV / Employment of Healthcare Individual Workers: laboratory liaison Response, capacity building Pending IDA / 65980 Post Consultant Limited 10,800.00 0.00 2020-11-15 2020-11-20 2020-11-27 2020-12-25 2021-01-24 officers to be paid on a and training Implementation Selection monthly basis for a period of six months KE-MOH-196786-CS-INDV / Employment of Healthcare Individual Workers: Seven (No.7) public Response, capacity building Pending IDA / 65980 Post Consultant Limited 31,500.00 0.00 2020-11-15 2020-11-19 2020-11-26 2020-12-24 2021-01-24 health technicians to be paid and training Implementation Selection on a monthly basis for a period of six months KE-MOH-196783-CS-INDV / Employment of Healthcare Individual Workers: One Hundred and Response, capacity building Pending IDA / 65980 Prior Consultant Limited 720,000.00 0.00 2020-11-15 2020-11-19 2020-11-26 2020-12-24 2021-01-24 Sixty (No. 160) Nurses to be and training Implementation Selection paid on a monthly basis for a period of six months KE-MOH-196776-CS-INDV / Employment of Healthcare Individual Workers: Two (No. 2) logistics Response, capacity building Pending IDA / 65980 Post Consultant Limited 18,000.00 0.00 2020-11-15 2020-11-18 2020-11-25 2020-12-23 2021-01-22 officers for PHEOC to be paid and training Implementation Selection on a monthly basis for a period of six months KE-MOH-196756-CS-INDV / Employment of Healthcare Workers employed on a Individual monthly basis for a period of Response, capacity building Pending IDA / 65980 Prior Consultant Limited 531,000.00 0.00 2020-11-06 2020-11-09 2020-11-16 2020-12-14 2021-01-13 six (6) months. and training Implementation Selection Employment of One Hundred and Eighteen (No. 118) laboratory technicians. KE-MOH-196766-CS-INDV / Employment of Health Care workers: Fifty Four (No. 54) Individual Response, capacity building Pending Lab Information Management IDA / 65980 Post Consultant Limited 243,000.00 0.00 2020-11-15 2020-11-18 2020-11-25 2020-12-23 2021-01-22 and training Implementation Officers to be paid on a Selection monthly basis for a period of six months KE-MOH-189062-CS-INDV / Employment of One Hundred (No. 100) public health Individual officers for monthly period of Response, capacity building Pending IDA / 65980 Post Consultant Limited 450,000.00 0.00 2020-11-22 2020-11-27 2020-11-30 2020-12-28 2021-01-28 6 months. The contracts will and training Implementation Selection be renewable after 3 months based on performance and need. KE-MOH-196781-CS-INDV / Employment of Healthcare Individual Workers: Thirty-two (No. 32) Response, capacity building Pending IDA / 65980 Post Consultant Limited 144,000.00 0.00 2020-11-22 2020-11-26 2020-12-03 2020-12-24 2021-01-24 Clinical Officers to be paid on and training Implementation Selection a monthly basis for a period of six months KE-MOH-203424-CS-INDV / Engagement of a Consultant Individual for Development of a Five Availability of safe blood and Pending IDA / 65980 Post Consultant Limited 25,000.00 0.00 2020-11-15 2020-11-20 2020-11-25 2020-12-16 2021-02-14 Year Strategic Plan for the blood products Implementation Selection Kenya National Blood Transfusion Services Division KE-MOH-226655-CS-INDV / Hire an individual consultant Individual Community discussion and Pending to support implementation of IDA / 65980 Post Consultant Limited 10,500.00 0.00 2021-03-29 2021-04-03 2021-04-08 2021-04-22 2021-10-19 information outreach Implementation the 5th COVID-19 Knowledge Selection Attitude Practice (KAP) Survey. Page 8 GOVERNANCE TO ENABLE SERVICE DELIVERY IN MALAWI PROJECT PREPARATION ADVANCE (PPA) PROCUREMENT PLAN I. General 1. Project Information Country: Malawi Project Name: Governance to Enable Service Delivery in Malawi Project ID: P164961 2. Project Implementation Agency: National Local Government Finance Committee (NLGFC) 3. Date of the Procurement Plan: February 1, 2019 4. Period Covered by this procurement plan: II. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations as set forth in STEP. III. Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. IV. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 1 When the Borrower uses its own national open competitive procurement arrangements as set forth in The Public Procurement and Disposal of Assets Act, 2017 and its subsidiary instruments namely: The Public Procurement Regulations, 2004, Desk Instructions (2005), Standard bidding Documents and Circulars for the Public Procurement and Disposal of Assets (PPDA) Authority such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations under the following conditions: o Provision of “set-asides” contracts for small enterprises shall not be applied. o Criteria such as environmental aspect, extent of local content, technology transfer, and managerial, scientific & operational skills development shall not be used in the evaluation of bids unless specifically agreed by the Bank on case to case basis. o Procurement Documents include provisions, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.4(c) and 5.5 of the Procurement Regulations, the request for bids/request for proposals/request for quotations document shall require that Bidders/Proposers submitting Bids/Proposals/quotations present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. V. Prequalification: N/A VI. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. VII. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable. VIII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). (a) Goods: N/A 2 (b) Works: N/A Domestic preference is not applicable for National Open Competitive Procurement IX. Other Relevant Procurement Information Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc.--NONE X. Procurement Prior Review Thresholds (US$ millions): The overall Project procurement Risk is Substantial. The project being a non- emergency project, there would be generally prior reviews of cases unless specifically indicated in the Procurement Plan as a special measure. Post Review: All contracts not subject to prior review shall be subject to post review. XI. Procurement Prior Review Thresholds Based on Substantial Risk Rating (US$ millions) Type of Procurement Threshold (Million USD) Works (including turnkey, supply & installation of plant 5 and equipment, and PPP) Goods, information technology and non-consulting 1.5 services Consultants: firms 0.5 Consultants: Individuals 0.2 XII. Thresholds for procurement approaches and methods 3 Works Goods, IT and Non- Shortlist of Consulting Services National Consultants Open Open Request Open Open Request Consultin Engineering Internation Nation for Internation National for g Services & al al Quotatio al Quotation Construction n < < Supervision ≧ < ≧ ≦ ≦ ≦ 7 7 0.2 1 1 0.1 0.2 0.3 4 PROCUREMENT PACKAGES WITH METHODS AND TIME SCHEDULES A. GOODS B. CONSULTANCY SERVICES Sr. No Contract Description Est. Cost Review by Market Selecti Evaluati Shortlisti Expected Expected (US$) Bank Approach on on ng date of date of (Prior/ Method Options (Yes/ No) proposal Contract Post) opening Signature 1 Design of Performance Based Grant, 270,000. assessment and associated Systems and Prior Direct CDS Yes Feb 2019 Mar 2019 00 Procedures for Local Authorities 5 SUMMARY NO CATEGORY OF VALUE (US$) PROCUREMENT A Goods B Works C Consultancy D Non-Consultancy TOTAL 6 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 7 (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any 8 documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 9 PROCUREMENT Malawi : Malawi Governance to Enable Service Delivery Project PLAN General Information Country: Malawi Bank’s Approval Date of the Original Procurement Plan: 2019-02-21 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164961 GPN Date: Project Name: Malawi Governance to Enable Service Delivery Project Loan / Credit No: IDA / V2660, IDA / D5980 National Local Government Finance Committee Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-149068-GO-RFQ Local Government Request for Single Stage - One / Procurement of ICT IDA / V2660 Performance Improvement Post Limited 9,027.00 11,112.34 Completed 2019-12-09 2019-12-11 2019-12-23 2020-04-30 2020-01-20 2020-06-05 Quotations Envelope equipment Support MW-NLGFC-238107-GO-RFQ Local Government Pending Request for Single Stage - One / Procurement of ICT IDA / D5980 Performance Improvement Post Limited 42,000.00 0.00 Implementati 2021-06-09 2021-06-25 2021-07-16 Quotations Envelope Equipment Support on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-197512-CS-CQS Consultant / Consultancy Services for Performance-Based Financing IDA / D5980 Post Qualification Open - National 300,000.00 359,509.78 Completed 2020-10-04 2020-10-04 2020-10-18 2020-11-01 2020-10-20 2020-11-21 2020-11-03 2020-12-19 2020-11-24 2021-06-17 2021-05-21 Conducting Local Authority for Service Delivery Selection Performance Assessment MW-NLGFC-235745-CS- QCBS / Consultancy Services Performance-Based Financing Quality And Cost- Under for Conducting Local IDA / D5980 Post Open - International 300,000.00 0.00 2021-05-30 2021-05-25 2021-06-14 2021-07-05 2021-08-02 2021-08-09 2021-09-13 2021-10-18 2022-04-16 for Service Delivery Based Selection Implementation Authority Performance Assessment INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-98182-CS-CDS / Local Government Performance Based Grant IDA / V2660 Post Direct Selection Direct 270,000.00 318,610.00 Completed 2019-02-08 2019-02-22 2019-02-20 2019-03-11 2019-04-15 2019-04-15 2019-07-14 2019-12-19 Design and National Local Government Finance Committee Support MW-NLGFC-149364-CS- Local Government Individual INDV / Deputy Project IDA / V2660 Performance Improvement Post Consultant Limited 39,000.00 39,000.00 Completed 2019-12-06 2019-05-23 2019-12-11 2019-10-08 2019-12-13 2019-10-08 2019-12-15 2019-06-07 2020-06-30 2020-12-18 Coordinator (2) Support Selection MW-NLGFC-149365-CS- Local Government Individual INDV / Deputy Project IDA / V2660 Performance Improvement Post Consultant Limited 39,000.00 39,000.00 Completed 2019-12-10 2019-05-23 2019-12-13 2019-06-04 2019-12-14 2019-10-08 2019-12-16 2019-09-30 2020-07-04 2020-12-18 Coordinator (1) Support Selection MW-NLGFC-149344-CS- Local Government Individual INDV / Project Coordinator - IDA / V2660 Performance Improvement Post Consultant Direct 45,500.00 45,000.00 Completed 2019-12-10 2019-05-23 2019-12-12 2019-06-04 2019-12-16 2019-06-07 2019-12-20 2019-09-30 2020-06-30 2020-12-18 Preparatory phase of GESD Support Selection Project MW-NLGFC-150619-CS- Local Government Individual INDV / Consultancy to IDA / V2660 Performance Improvement Prior Consultant Direct 5,000.00 0.00 Canceled 2019-12-18 2019-12-29 2020-01-19 2020-02-23 2020-08-21 undertake Economic Analysis Support Selection for GESD Project MW-NLGFC-162841-CS-CDS / Technical Assistance in the preparation of Thematic Performance-Based Financing IDA / V2660 Post Direct Selection Direct 80,000.00 52,238.00 Signed 2020-03-15 2020-03-04 2020-03-21 2019-12-16 2020-04-14 2020-04-30 2020-10-11 Performance Improvement for Service Delivery Plans and Finalisation of the LAPA Tool MW-NLGFC-150619-CS- Local Government Individual INDV. / Consultancy to IDA / V2660 Performance Improvement Post Consultant Direct 5,000.00 4,400.00 Completed 2019-11-20 2019-11-20 2019-11-30 2019-12-16 2019-12-21 2020-01-06 2020-01-25 2020-01-21 2020-02-24 2020-02-06 undertake Economic Analysis Support Selection for the GESD Project MW-NLGFC-184482-CS- Local Government Individual INDV / Procurement of a IDA / V2660 Performance Improvement Post Consultant Limited 50,000.00 62.81 Signed 2020-07-20 2020-07-17 2020-07-22 2020-07-23 2020-08-05 2020-10-20 2020-08-14 2020-10-20 2021-02-10 Communication Consultant Support Selection Page 1 MW-NLGFC-198112-CS- Individual Adaptive Management and INDV / Procurement of Project IDA / D5980 Post Consultant Open 36,000.00 86,638.09 Signed 2020-09-20 2020-09-20 2020-11-08 2020-10-19 2020-11-29 2021-01-25 2021-01-03 2021-03-24 2022-01-03 Innovation Support Coordinator Selection MW-NLGFC-198126-CS- Individual Adaptive Management and Under INDV / Procurement of IDA / D5980 Post Consultant Open 24,000.00 0.00 2020-09-20 2020-09-20 2020-11-08 2020-10-19 2020-11-29 2021-01-03 2022-01-03 Innovation Support Implementation Procurement Officer Selection MW-NLGFC-198119-CS- Individual Adaptive Management and Under INDV / Procurement of IDA / D5980 Post Consultant Open 24,000.00 0.00 2020-09-20 2020-09-20 2020-11-08 2020-10-19 2020-11-29 2021-01-03 2022-01-03 Innovation Support Implementation Training Officer Selection MW-NLGFC-198110-CS- Individual Adaptive Management and Under INDV / Procurement of IDA / V2660 Post Consultant Open 24,000.00 0.00 2020-09-20 2020-10-20 2020-11-08 2020-11-29 2021-01-03 2022-01-03 Innovation Support Implementation Planning Officer Selection MW-NLGFC-198134-CS- Individual INDV / Procurement of Adaptive Management and Under IDA / D5980 Post Consultant Open 24,000.00 0.00 2020-09-20 2020-09-20 2020-11-08 2020-11-29 2021-01-03 2022-01-03 Environmental and Social Innovation Support Implementation Selection safeguards Officer MW-NLGFC-198130-CS- Individual INDV / Procurement of Adaptive Management and IDA / D5980 Post Consultant Open 24,000.00 16,762.99 Signed 2020-09-20 2020-09-20 2020-11-08 2020-10-19 2020-11-29 2020-11-13 2021-01-03 2020-12-03 2022-01-03 Communication and outreach Innovation Support Selection Officer MW-NLGFC-198128-CS- Individual Adaptive Management and INDV / Procurement of Budget IDA / D5980 Post Consultant Open 24,000.00 15,366.07 Signed 2020-09-20 2020-09-20 2020-11-08 2020-10-19 2020-11-29 2020-11-27 2021-01-03 2021-02-25 2022-01-03 Innovation Support Analyst Selection Page 2 PROCUREMENT PLAN (Textual Part) Project information: Nepal, [Rural Economic and Enterprise Development Project] [P170215] Project Implementation agency: [Ministry of Agriculture and Livestock Development] Date of the Procurement Plan: September 1, 2020 Period covered by this Procurement Plan: [January 1, 2021 – July 1, 2022] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used, with applicable caveats as follows. National Procurement Procedures: These procedures are applicable for the procurement of goods, works and non-consulting services only. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan tables in STEP, the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Nepal’s Public Procurement Act, 2007, as amended by Amendment 2073 (2016) – (1st Amendment) and the Public Procurement Regulation, 2007, as amended by 10th Amendment ((27 Apr 2020)), such arrangements shall be subject to paragraph 5.4 of the Bank’s Procurement Regulations and the following conditions: 1) Model bidding documents, including contract conditions agreed with the Bank (as amended from time to time), shall be used. Bidding documents shall be made available, by mail or in person, or through e-GP portal to all who are willing to pay the required fee. 2) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 3) The request for bids / request for proposals document shall require that Bidders / Proposers submitting Bids / Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Qualification criteria (in case pre-qualifications were not carried out) shall be stated in the bidding documents for all contracts, irrespective of the value, and if a registration process is required, a foreign firm declared as the lowest evaluated bidder shall be given a reasonable opportunity to register, without let or hindrance. 5) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. 6) Performance security should be an amount of five (5) to ten (10) percent of the contract price and shall not be increased merely based on comparison of the bid price of awarded bidders with the pre-bid cost estimate. 7) If a contract is terminated because of fundamental breach of contract by the contractor, the amount to be recovered from the contractor representing the employer’s additional costs for completing the contract shall be provisioned as agreed with the Bank in model bidding documents. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Nepal : Rural Enterprise and Economic Development Project PLAN General Information Country: Nepal Bank’s Approval Date of the Original Procurement Plan: 2020-09-11 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170215 GPN Date: 2021-05-18 Project Name: Rural Enterprise and Economic Development Project Loan / Credit No: / , IDA / 67870 M Executing Agency(ies): inistry of Agriculture and Livestock Development WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NP-MOALD-236984-CW-RFQ- Request for Pending Component 4: Project Request for Single Stage - One 2021-12- OPD-PARQUETING / Floor IDA / 67870 Post Limited Quotations (Non 8,490.00 0.00 Implementat 2021-06-04 2021-06-29 Management Quotations Envelope 26 Parqueting of OPD building Bank-SPD) ion NP-MOALD-236985-CW-RFQ- OPD-MAINTENANCE / Request for Pending Component 4: Project Request for Single Stage - One 2021-07- Maintenance of OPD building: IDA / 67870 Post Limited Quotations (Non 16,980.00 0.00 Implementat 2021-06-03 2021-06-28 Management Quotations Envelope 15 Wiring, Painting, Toilet Bank-SPD) ion renovation GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOALD-189764-GO-RFB / Procurement of 4WD Service Utility Vehicles 1 Nos, 4WD Component 4: Project Single Stage - One / Post Request for Bids Open - National 742,000.00 0.00 Canceled 2021-01-01 2021-01-06 2021-02-05 2021-03-07 2021-03-28 2021-05-27 Double Cab Pickups 5 Nos Management Envelope and 2WD Cars 3 Nos for OPD and ECOs. NP-MOALD-235502-GO-DIR- Under Component 4: Project 1 / Procurement of SUV cars IDA / 67870 Post Direct Selection Direct 169,650.00 152,972.99 Implementati 2021-05-26 2021-06-01 2021-05-29 2021-06-16 2021-06-16 2021-07-03 Management for OPD (3 Nos) on NP-MOALD-235990-GO-RFQ- DHUNKUTA-FRNITURE / Pending Furniture and Furnishing: Component 4: Project Request for Single Stage - One IDA / 67870 Post Limited 3,932.00 0.00 Implementati 2021-06-05 2021-07-13 2022-01-09 ECO, Dhankuta: Ofice table Management Quotations Envelope on and Chair, Sofa, Steel Cabinet, Carpet and Curtains NP-MOALD-235993-GO-RFQ- BARDIBAS-FRNITURE / Pending Furniture and Furnishing: Component 4: Project Request for Single Stage - One IDA / 67870 Post Limited 3,932.00 0.00 Implementati 2021-06-05 2021-07-13 2022-01-09 Ofice table and Chair, Sofa, Management Quotations Envelope on Steel Cabinet, Carpet and Curtains NP-MOALD-235996-GO-RFQ- BUTWAL-FRNITURE / Furniture Pending Component 4: Project Request for Single Stage - One and Furnishing: Ofice table IDA / 67870 Post Limited 3,932.00 0.00 Implementati 2021-06-05 2021-07-13 2022-01-09 Management Quotations Envelope and Chair, Sofa, Steel Cabinet, on Carpet and Curtains NP-MOALD-235997-GO-RFQ- DADELDHURA-FRNTRE / Pending Furniture and Furnishing: Component 4: Project Request for Single Stage - One IDA / 67870 Post Limited 3,932.00 0.00 Implementati 2021-06-05 2021-07-13 2022-01-09 Ofice table and Chair, Sofa, Management Quotations Envelope on Steel Cabinet, Carpet and Curtains NP-MOALD-189777-GO-RFB / Procurement of 50 Nos of Component 4: Project Single Stage - One / Post Request for Bids Open - National 104,165.00 0.00 Canceled 2021-01-15 2021-01-20 2021-02-19 2021-03-21 2021-04-11 2021-06-10 two wheelers (Motorcycles) for Management Envelope OPD and ECOs NP-MOALD-189784-GO-RFB / Procurement of Branded Desktop Computer 50 Nos, Multifunction Laser Printer 10 Nos, Laser Printer 40 Nos, Component 4: Project Single Stage - One / Post Request for Bids Open - National 102,125.00 0.00 Canceled 2021-02-01 2021-02-06 2021-03-08 2021-04-07 2021-04-28 2021-07-27 Branded Laptop 20 Nos, Management Envelope UPS50 Nos, Multimedia Projector 5 Nos, Heavy Duty Photocopier 1 Nos, Medium Duty Photocopier 4 Nos. NP-MOALD-189793-GO-RFQ Component 4: Project Request for Single Stage - One / Procurement of furniture / Post Open - National 16,665.00 0.00 Canceled 2021-01-06 2021-03-01 2021-04-30 Management Quotations Envelope and furnishing for OPD. NP-MOALD-235981-GO-RFQ- OPD-FURNITURE1 / Procurement of Furniture: Ofice table and chair set 16 Pending Component 4: Project Request for Single Stage - One Nos, Sofa 6 Nos, Table for IDA / 67870 Post Limited 13,499.00 0.00 Implementati 2021-06-04 2021-07-04 2021-07-15 Management Quotations Envelope meeting hall 3 Nos. Chair for on Meeting hall 15 Nos, Team table 2 Nos., Curtains and Carpets NP-MOALD-236991-GO-DIR- Pending OPD-MOTORCYCLE / Component 4: Project IDA / 67870 Post Direct Selection Direct 18,421.00 0.00 Implementati 2021-06-01 2021-06-04 2021-06-21 2021-07-15 Procurement of Motorcycle: Management on Motorcycle 7 Nos NP-MOALD-236988-GO-DIR Pending Component 4: Project / Procurement of Scooter: IDA / 67870 Post Direct Selection Direct 10,187.00 0.00 Implementati 2021-06-01 2021-06-04 2021-06-18 2021-06-18 Management Scooter 4 Not on Page 1 NP-MOALD-236995-GO-RFQ- Pending Component 4: Project Request for Single Stage - One OPD-FURNISHING / Furnishing IDA / 67870 Post Limited 3,396.00 0.00 Implementati 2021-06-05 2021-07-07 2021-07-15 Management Quotations Envelope OPD on NP-MOALD-237009-GO-RFQ- OPD-OE1 / Office Equipment Pending Component 4: Project Request for Single Stage - One for OPD: Photocopy 1No, TV 1 IDA / 67870 Post Limited 13,245.00 0.00 Implementati 2021-06-05 2021-07-02 2021-07-16 Management Quotations Envelope No, Projector 1 No, Camera 1 on No, Printer 12 No. NP-MOALD-237008-GO-RFQ- OE-OPD / Desktop and Pending Component 4: Project Request for Single Stage - One Laptops for OPD and ECOs: IDA / 67870 Post Limited 25,000.00 0.00 Implementati 2021-06-04 2021-07-01 2021-07-15 Management Quotations Envelope Branded Desktop Computer on 13 Nos, Laptop 11 Nos NP-MOALD-238100-GO-RFQ- KITCHEN / Procurement Pending Kitchenware: Refrigerator, Component 4: Project Request for Single Stage - One IDA / 67870 Post Limited 1,095.00 0.00 Implementati 2021-06-10 2021-07-07 2021-07-15 Water Boiler, Vaccume Management Quotations Envelope on cleaner, Induction stove, cooking gas and stove. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOALD-189836-CS- QCBS / Procurement of Component 4: Project Quality And Cost- Pending / Prior Open - International 2,800,000.00 0.00 2021-02-01 2021-02-22 2021-04-07 2021-05-05 2021-06-04 2021-07-09 2021-08-06 2025-07-16 Technical Assistance Firm for Management Based Selection Implementation OPD. NP-MOALD-189868-CS-LCS Component 4: Project Least Cost Pending / Consultancy Services of MIS / Post Open - National 40,000.00 0.00 2021-06-15 2021-07-06 2021-08-19 2021-09-16 2021-10-16 2021-11-20 2021-12-25 2022-06-23 Management Selection Implementation Development NP-MOALD-193730-CS- QCBS / Consulting Services Component 4: Project Quality And Cost- Pending / Post Open - National 50,000.00 0.00 2021-02-25 2021-03-18 2021-05-01 2021-05-29 2021-06-28 2021-08-02 2021-09-06 2022-02-03 for conducting baseline Management Based Selection Implementation survey. NP-MOALD-194882-CS- Component 2: Strengthening QCBS / Intermediary the entrepreneurship Quality And Cost- Pending / Post Open - National 300,000.00 0.00 2021-05-10 2021-05-31 2021-07-14 2021-08-11 2021-09-10 2021-10-15 2021-11-19 2024-11-18 Institution to build capacity of ecosystem in the federal Based Selection Implementation agri-SMEs structure INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOALD-238102-CS- Individual INDV_GOM / Individual Component 4: Project IDA / 67870 Post Consultant Limited 3,820.00 0.00 Under Review 2021-06-07 2021-06-23 2021-06-08 2021-06-12 2021-06-15 2021-12-15 Consultant: Grant Operating Management Selection Manual NP-MOALD-190735-CS- Individual INDV / Recruitment of Component 4: Project IDA / 67870 Post Consultant Open 16,267.00 0.00 Under Review 2021-06-11 2021-06-16 2021-07-12 2021-07-20 2021-08-10 2022-07-15 financial management Management Selection specialist NP-MOALD-189867-CS- Individual Component 4: Project INDV / Monitoring and IDA / 67870 Post Consultant Open 106,158.00 0.00 Under Review 2021-06-11 2021-06-16 2021-07-12 2021-07-16 2021-08-11 2025-07-15 Management Evaluation of Expert Selection NP-MOALD-189828-CS- Individual INDV / Procurement of Component 4: Project Under IDA / 67870 Prior Consultant Open 59,500.00 0.00 2021-06-11 2021-06-16 2021-07-14 2021-07-18 2021-08-04 2025-07-31 individual Procurement Management Implementation Selection Specialist. NP-MOALD-189865-CS- Individual Component 4: Project INDV / Selection of social IDA / 67870 Post Consultant Open 16,267.00 0.00 Under Review 2021-06-11 2021-06-24 2021-07-30 2021-08-20 2021-09-24 2022-03-23 Management safeguard specialist Selection NP-MOALD-189866-CS- Individual Component 4: Project INDV / Selection of IDA / 67870 Post Consultant Open 16,267.00 0.00 Under Review 2021-06-11 2021-06-24 2021-07-25 2021-08-15 2021-09-19 2022-03-18 Management Environment Safeguard Expert Selection Page 2 Procurement Plan for MITP project I. General 1. Bank’s approval Date of the procurement Plan 24th July 2019 2. Date of General Procurement Notice: 15th July 2019 3. Period covered by this procurement plan: The procurement period of project covered from year July 2019 to Dec 2020 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Threshold Comments US$ 1. ICB and LIB (Goods) Above 3000 000 2. NCB (Goods) Less than 3000 000 3. NCB (Non-Consultant Services) Do 4. ICB (Works) Above 40 000 000 5. NCB (Works) Less 40 000 000 6. National shopping Less than 100 000 2. Prequalification. NA. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project Procurement Manual will be prepared by MIDFC 5. Any Other Special Procurement Arrangements: Retroactive financing is applicable for this project 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / rence Post) July 9, 2010 US$ (yes/ million no) Summary Nil Nil of the ICB (Works) Summary Nil Nil of the ICB (Goods) Summary 100 100 NA Post Nil of the NCB (Works) Road construct ion & rehabilit ation Summary Nil Nil of the NCB (Goods) Summary Nil nil of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1,000,000 2. Single Source (Firms) Do 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_800,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of Procurement Regulation. 3. Any Other Special Selection Arrangements: Retroactive financing is applicable . 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 July 9, 2010 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary Nil of number of contracts that will be let under QCBS Summary 2.4 3 Post All are of number review CQS of contracts that will be let under other methods July 9, 2010 PROCUREMENT India : Meghalaya Integrated Transport Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2019-09-10 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168097 GPN Date: 2019-07-15 Project Name: Meghalaya Integrated Transport Project Loan / Credit No: IBRD / P4980, IBRD / 91690 M Executing Agency(ies): eghalaya infrastructure Development Finance Corporation WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Asset IN-MIDFC-199396-GO-RFQ / Pending Management, Institutional Request for Single Stage - One Office Supplies and Electronic IBRD / P4980 Post Limited 66,000.00 0.00 Implementati 2020-10-27 2020-11-22 2020-12-22 Effectiveness and Transport Quotations Envelope Equipments for the MITP on Services IN-MIDFC-201712-GO-RFQ / Component 2: Asset Procurement of three (3) Pending Management, Institutional Request for Single Stage - One office Vehicles under the IBRD / P4980 Post Limited 52,000.00 0.00 Implementati 2020-11-03 2020-11-20 2020-12-20 Effectiveness and Transport Quotations Envelope Meghalaya Integrated on Services Transport Project (MITP) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-MIDFC-183421-CS-CQS / Hiring an agency for Component 1: Effective Consultant Under conducting a short study on IBRD / P4980 delivery and maintenance of Post Qualification Open - National 264,000.00 0.00 2020-07-12 2019-03-11 2020-08-02 2020-09-15 2019-09-17 2020-10-15 2020-07-02 2020-11-19 2021-02-17 Implementation "Sustainable Mobility Future transport infrastructure Selection for Meghalaya (SMFM)" IN-MIDFC-133416-CS-QCBS Quality And Cost- / Project Management IBRD / P4980 Prior Open - International 1,572,415.00 0.00 Canceled 2019-09-10 2019-09-20 2019-10-15 2019-11-05 2019-11-11 2019-12-16 2019-12-26 2020-01-08 2020-02-14 2023-02-13 Based Selection Consultancy INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-MIDFC-162085-CS-CDS / Hiring KMPG for the preparation of the SDG framework for the state of Meghalaya. Component 3: Project As part of Vision 2030 for IBRD / P4980 Management and Prior Direct Selection Direct 122,863.00 0.00 Canceled 2020-07-01 2020-07-08 2020-08-01 2020-10-30 Meghalaya, the Government Implementation has taken series of initiatives to achieve SDGs. And therefore need a identify the indicators and develop a long term mon IN-MIDFC-183413-CS-CDS / Hiring CSIR-CRRI to develop an Integrated Transport Network Development Plan Component 1: Effective (ITNDP) to facilitate systematic Under IBRD / P4980 delivery and maintenance of Post Direct Selection Direct 270,000.00 0.00 2020-07-10 2020-01-24 2020-07-20 2020-09-23 2021-09-23 growth of the transport Implementation transport infrastructure network to realise the state’s Vision, for establishing transport network development. IN-MIDFC-183692-CS-CDS / Hiring KPMG for the Component 3: Project Under development of the UN SDG IBRD / P4980 Management and Post Direct Selection Direct 140,000.00 0.00 2020-07-15 2020-01-17 2020-07-22 2020-08-15 2021-08-15 Implementation Pilot Implementation program Implementation in the state of Meghalaya. IN-MIDFC-189263-CS-CDS / Hiring an agency for Component 2: Asset Production of a short Clip/film Management, Institutional Pending on behalf of Public Works IBRD / P4980 Post Direct Selection Direct 920.00 0.00 2020-08-28 2020-08-31 2020-09-04 2020-09-07 Effectiveness and Transport Implementation Department for the Services “Meghalaya Integrated Transport Project Page 1 IN-MIDFC-205437-CS-INDV / DPR Preparation of approach Component 1: Effective Individual roads and trekking paths for Pending IBRD / 91690 delivery and maintenance of Post Consultant Limited 24,500.00 0.00 2020-11-20 2020-11-25 2020-11-30 2020-12-10 2021-06-08 last mile connectivity to the Implementation transport infrastructure Selection Tourist Places in the State of Meghalaya. IN-MIDFC-227169-CS-CDS / Planning Department of Government of Meghalaya vide Letter no: PLR/41/2020/5, Dated 11th Component 1: Effective Under June 2020 requested NISG for IBRD / 91690 delivery and maintenance of Post Direct Selection Direct 237,000.00 0.00 2021-04-05 2020-06-15 2021-04-15 2021-06-19 2023-06-19 Implementation three resources namely transport infrastructure Project Manager, Manager and Project Manager – MIS & Dashboard to cater the necessary requirements for the Project IN-MIDFC-235982-CS-CDS / Allocation of additional consulting service to KPMG for Component 1: Effective Under the preparation of Financial IBRD / 91690 delivery and maintenance of Post Direct Selection Direct 87,200.00 0.00 2021-05-31 2021-04-27 2021-06-10 2021-08-14 2022-02-10 Implementation and Implmentation plan for transport infrastructure the Enhanced Mobility project envisioned under MITP Page 2 PROCUREMENT PLAN (Mandatory Requirements) BANGLADESH SCALNG UP RENEWABLE ENERGY PROJECT (P161869) PROJECT IMPLEMENTATION AGENCIES: Electricity Generation Company of Bangladesh (EGCB) Infrastructure Development Company Limited (IDCOL) Sustainable and Renewable Energy Development Authority (SREDA) Period covered by this Procurement Plan: Entire Project Period Preamble In accordance with paragraph 5.9 of the World Bank Procurement Regulations for IPF Borrowers, July 2016 revised November 2017 (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents (SPDs) shall be used for goods, works and non-consulting services where international competition is required and for all consulting services, including their respective forms of contract. National Procurement Arrangements: In accordance with paragraph 5.3 of the World Bank Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan, the country’s own 1 procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Act 2006 and the Public Procurement Rules 2008, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) Lottery in award of contracts shall not be allowed; 2) Bidders’ qualification[s]/experience requirement[s] shall be mandatory; 3) Bids shall not be rejected based on percentage above or below the estimated cost; 4) Model Bidding Documents agreed with the Bank shall be used for all national open competitive procurement; 5) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 6) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. When the Borrower uses other national procurement arrangements (other than national open competitive procurement), such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), such arrangements shall be consistent with the above requirements. As per paragraph 5.4 of the Procurement Regulations, the “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework” as attached to this document shall form part of the Model Bidding Documents. Leased Assets: Not Applicable. Procurement of Second Hand Goods: Not Applicable. Domestic preference: as specified under paragraph 5.51 of the Procurement Regulations as follows: 2 Works: Not applicable. Plant/Supply and Installation: Not applicable Hands-on Expanded Implementation Support (HEIS): Not Applicable. Bank’s Procurement Prior Review Thresholds: contracts at or above the thresholds set out in table 1 below are subject to the Bank’s procurement prior review. Table 1: Procurement Prior Review Thresholds (US$ millions) Type of High risk Substantial Moderate Low risk procurement risk risk Works (including 5 10 15 20 turnkey, supply & installation of plant and equipment, and PPP) Goods, information 1.5 2 4 6 technology and non-consulting services 3 Consulting 0.5 1 2 4 services: firms Consulting 0.2 0.3 0.4 0.5 services: Individual Notes: 1. These thresholds apply to all procurement activities regardless of their procurement/selection methods. There is no automatic requirement to undertake prior review for direct selection for value less than these thresholds. Consultant services covers a range of services that are of an advisory or professional nature. 2. In addition to the provisions of Table 1 above, and irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: (a) procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulations; (b) competitive dialogue; (c) sustainable procurement; (d) selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations; and (e) best and final offer. 3. The determination of whether a contract meets the procurement prior review threshold is based on the estimated value of the contract or the package -when the selection document contains more than one lot/slice-, including all taxes and duties payable under the contract. 4 Bid/ Proposal Evaluation Committee: EGCB requires to engage (recruited by EGCB as Consultant) one international technical consultant (solar power plant expert) and one international procurement consultants in their bid/proposal evaluation committee for the procurements of solar power plant and supervision consultant/owner’s engineer. Formation and alteration of the bid/proposal evaluation committee shall be subject to Bank’s no objection. Attachment 1 Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 5 Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 6 c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub- consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 7 We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 8 PROCUREMENT Bangladesh : Bangladesh Scaling-up Renewable Energy Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2018-12-11 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161869 GPN Date: 2021-05-26 Project Name: Bangladesh Scaling-up Renewable Energy Project Loan / Credit No: / , TF / A7640 I Executing Agency(ies): nfrastructure Development Company Limited WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G-01 UNDER SREP / Pending Commercial Software for TF / A7640 Technical Assistance Post Direct Selection Direct 3,500.00 0.00 Implementati 2020-11-26 2020-11-29 2020-12-02 2021-12-02 IDCOL Solar Rooftop Project on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-01 UNDER SREP / Consultant Consultant for developing Renewable Energy Financing / Post Qualification Open - National 300,000.00 0.00 Canceled 2019-02-03 2019-02-24 2019-03-24 2019-05-05 2019-06-04 2019-09-02 ESCO model and financing Facility (REFF) Selection instruments for IDCOL S-02 UNDER SREP / Consultant for supporting in Consultant Standardization of appraisal / Technical Assistance Post Qualification Open - International 100,000.00 0.00 Canceled 2019-03-03 2019-03-04 2019-06-02 2019-07-22 2019-08-23 2019-11-21 process, Training, Selection Development of guidelines etc. S-03/01 UNDER SREP / Selection of Firm for Quality And Cost- Pending TF / A7640 Technical Assistance Post Open - National 250,000.00 0.00 2019-10-10 2019-10-31 2019-12-14 2020-01-11 2020-02-10 2020-03-16 2020-04-20 2021-04-20 promoting IDCOL Solar Based Selection Implementation Rooftop system S-04 UNDER SREP / Selection Consultant Renewable Energy Financing Pending of Technical Consultant under TF / A7640 Post Qualification Open - International 400,000.00 0.00 2021-04-15 2021-06-14 2021-08-28 2021-09-27 2021-11-01 2023-10-22 Facility (REFF) Implementation REFF Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-03 UNDER SREP / Consultant for Promotion and TF / A7640 Technical Assistance Post Direct Selection Direct 250,000.00 0.00 Canceled 2019-03-03 2019-03-13 2019-05-17 2020-05-16 Outreach Page 1 Procurement Plan Education Quality Reform Project of Mongolia I. General 1. Bank’s approval Date of the procurement Plan: 09 August 2016 2. Date of General Procurement Notice: Dec 24, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year Aug 2016 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Threshold Prior Review Threshold Methods Good International >US$1,000, > US$ 500,000 s Competitive 000 Bidding (ICB) National >US$100,00 Competitive 0 Bidding (NCB) Shopping US$5,000, > US$ 1,500,000 s Competitive 000 Bidding (ICB) National >US$200,00 Competitive 0 Bidding (NCB) Shopping US$ 600,000 (QCBS) for firms Quality-Based Assignments meeting Selection (QBS) the requirements of Article 3.2 of the > US$ 200,000 Consultant Guidelines for individual Consulti Selection Based =10,000,000 All contracts Installation) NCB >=200,000 - As in procurement <10,000,000 plan Shopping <200,000 None Direct Contracting All values All contracts 2. Goods ICB >=2,000,000 All contracts NCB >=100,000 <2,000,000 As in procurement plan Shopping <300,000 (motor None vehicles only) Shopping <100,000 000 (rest not None motor vehicles) Direct Contracting All values All contracts Procurement from All values None UNOPS Agency Note: Contracts with a cost estimate below US$300,000 for motor vehicles only may be procured on basis of Shopping procurement method 2. Prequalification. N/A 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines). N/A 4. Reference to (if any) Project Operational/Procurement Manual: The components will besides provisions of the Banks Guidelines for Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers, dated January 2011, revised April 2014 and the Banks Guidelines Procurement of Goods, works, and Non-Consulting Services under IDRD Loans and IDA Credits & Grants by World bank Borrowers, dated January 2011, revised April 2014 and will also make use of the additional information and guidance provided in Manual – Guidance for Procurement of Small Contracts; World Bank Africa Region Procurement February 2011, revised March 2014 and in the case of all contracts entered into using NCB based on use of National standard Bidding Documents, additional provisions of the attachments and standard clauses of the Bank’s Policy – Corrupt and Fraudulent Practices whose text may not be modified will be used in both the bidding documents and the ensuing contracts. 5. Any Other Special Procurement Arrangements. None 6. Procurement Packages with Methods and Time Schedule. Procurement of Good and Non Services Do Comme me nts Pre Expecte Packa sti Prior Expected Est Proc q d ge Plan/ c or Contract Descripti Amount Bid Actu Pr Post Signatur on in Metho (yes Openin Numb al ef Revie e US $ d / g er er w Date no) Date en ce 2 Component 1: Supporting Women's Livelihoods(Ministry of Community Development and Social Welfare) Printing of MCDS Plan NCB No No Post Feb April 2016 May teaching W/NCS/ 448,300 2016 require and 001 Actua to split learning l between materials MCDS Plan 1,255,000 NCB No No Prior Nov Feb 2016 Purchase W/NCS/ 2015 of motor 002 Actua vehicles l MCDS Plan Aug Aug 2016 550,000 Prior W/NCS/ Procure 2016 003 Actua ment l from UN Yes No Agenci Purchase es of motor (UNOP vehicles S) MCDS Plan NCB No No Post Nov Feb 2016 230,000 Purchase W/NCS/ 2015 of Motor 004 Actua Bikes l MCDS Plan Shoppi No No Post Nov Feb 2016 16,000 W/NCS/ ng 2015 Purchase 005 Actua of Bicycles l MCDS Plan Shoppi No No Post Nov Feb 2016 82,000 W/NCS/ ng 2015 006 Actua Purchase l of Boats Purchase MCDS Plan 100,000 Shoppi No No Post Mar Apr 2016 of Various W/NCS/ ng 2016 Office 007 Actua Furniture l and Equipment for H/Q and Districts Computers MCDS Plan March May 2016 Needed 281,300 Post , Laptops, W/NCS/ 2016 for the Scanners, 008 Actua SWL Printers, l NCB No No operatio Projectors, ns Cameras, UPS Launching Plan 535,000 Post April 2016 and Actua Equipment MCDS NCB No No l for W/NCS/ operation 009 3 of GRS Equipment MCDS Plan April June 2016 200,000 Post for ICT- W/NCS/ 2016 based 010 Actua NCB No No learning l tools Developm MCDS Plan 120,000 Post Jan 2016 June 2016 ent of W/NCS/ Actua software 011 l and database for real- time NCB No No registratio n of SWL beneficiari es and monitoring of activities. Sub Total Component 1; Goods and Non 3,817,600 Consultant Services Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education ) Purchase MGE/G/ Plan 60,000 Shoppi No No Post Jan 2016 Feb 2016 Hand of Laptops, 01 ng held Tablets Actua devices and l for the Routers Impleme ntation of the model to capture real-time informati on in the field. IT MGE/G/ Plan 100,000 Shoppi No No Post Jan 2016 March (includin Equipment 02 ng 2016 g Actua compute l rs and other IT equipme nt) Vehicles MGE/G/ Plan Shoppi Nov Jan 2016 250,000 No No Post for 03 ng 2015 selected 4 districts Actua l Component 2. Keeping Girls in School (Ministry of Community Development ) Procureme MCDS Plan Shoppi Nov Jan 2016 37,500 No No Post nt of W/NCS/ ng 2015 Project 001 Actua Vehicle l Sub Total Component 2; Goods and Non 447,500 Consultant Services Component 3 (a): Institutional Strengthening and Systems Building: (Ministry of Gender) Setting up MOG/G Plan Shoppi No No Post Jun 2016 July 2016 IT /01 100,000 ng infrastruct Actua ure for l M&E in MOG vehicle for MOG/G Plan 50,000 Shoppi No No Post Nov Jan 2016 training, /02 ng 2015 and M&E Actua l Purchase MOG/G Plan 40,000.00 Shoppi No No Post Jun, July, 2016 of IT /03 ng 2016 Equipment Actua (Laptop l Computer, Desk top Computers , LAN, Camera, Projector and other IT Equipment s Purchase MOG/0 Plan 3,000 Shoppi No No Post Jun, July, 2016 of Office 4 ng 2016 Furniture Actua l Sub Total Component 3 A- Goods and Non 193,000 Consultant Services Component 3 (b) Institutional Strengthening and Systems: (Ministry of Community Development and Social Welfare) IT MCDS Plan 400,000 NCB No No Post Aug Dec 2015 Infrastruct W/G/01 2016 ure for Actua informatio l n systems 5 for MCDSW business at various levels Hardware MCDS Plan 150,000 NCB No No Post Nov Jan 2017 and W/G/02 2016 Software Actua for unique l identificati on solution Procureme MCDS Plan 60,000 Shoppi No No Post May June 2016 nt of W/G/03 ng 2016 devices for Actua field and l identificati on of beneficiari es Purchase MCDS Plan 100,000 Shoppi No No Post May July 2016 Goods of office W/G/04 ng 2016 for the furniture Actua National and l Social equpment Protectio n Co- ordinatio n Unit Purchase MCDS Plan 150,000 Shoppi No No Post July July 2016 For of Motor W/G/05 ng 2016 National Vehicles Actua Co- for l dination, National M&E and Social MIS. Protection Co- ordination Unit Sub Total Component 3 (b) : Goods and Non 860,000 Consultant Services Procurement of Works Sub Component 1: Supporting Women's Livelihoods(Ministry of Community Development and Social Welfare) MCDS Plan Shoppi No No Post Oct Oct 2016 45,000.00 Office W/W/0 ng 2016 refurbish 01 Actual ment Sub Component 3(b): Institutional Strengthening and Systems: (Ministry of Community Development and Social Welfare) Support to MCDS Plan 70,000 Shoppi No No Post Aug Aug 2016 office W/G/02 ng 2016 6 refurbish Actual ment Component 3 a). Institutional Strengthening and Systems: (Ministry of Gender ) Partitionin MOG/ Plan 2,000 Shoppi No No Post Sep Sep 2016 g of the W/01 ng 2016 Foyer for Actual the Conferenc e Room Sub Total: Works 127,000 II. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Table 2: Thresholds for Consultants Selection Methods and Prior Review Contract Value Contracts Subject Expenditure Procurement Threshold for use of to Prior Review Category Method selection method (US$ millions) (US$) QCBS, QBS >=200,000 All contracts Consulting As in procurement CQS, LCS, QBS, FBS <200,000 Firms plan SSS All values All Contracts Individual Competitive selection >=100,000 All contracts Consultants IC Single Source (IC) All values All contracts Selection NOTE: Contracts selected on basis of CQS should not exceed US$200,000 equivalent. Note: Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Engineering and contract management contracts with cost estimates of less than US$300,000 may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. The procurement plan will indicate those contracts using CQS whose short lists by exception may not comprise entirely national firms. Terms of Reference (TOR) for all consultancy contracts as well as all single source selections, irrespective of the contract value, will be subject to prior review. Any Other Special Selection Arrangements: N/A 2. Consultancy Assignments with Selection Methods and Time 1 2 3 4 5 6 7 7 Expected Prior Plan Estimate proposal Selecti / Ref. / d submissio Description on Post Comments No. Actu Cost in n Method Revie al US$ /opening w Date Component 1: Supporting Women’s Livelihoods(Ministry of Community Development and Social Welfare) Adoption and Roll-out of SWL sub component 1(a) MCDSW/ Survey Plan March 937,500 C/001 Enumeration of 2016 SWL beneficiaries Actua QCBS Prior l MCDSW/ Information, Plan CQS 200,000 Post May 2016 C/002 education and communications Actua outreach at local l and national level Service provider to Plan 845,000 Jan 2016 MCDSW/ pay productivity Actua QCBS Prior C/003 grants to l beneficiaries Sub-component 1b – Building National Implementation and Monitoring Capacity MCDSW/ Plan 112,500 Prior April 2016 C/004 Hiring of SWL Actua Contract Duration IC manager l is 24 Months MCDSW/ Plan IC 97,500 Post April 2016 C/005 Hiring of SWL M&E Actua Contract Duration Specialist l is 24 Months 97,500 April 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/006 Contract Duration M&E Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 97,500 Post Nov 2015 C/007 Contract Duration ICT Specialist Actua is 24 Months l July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/008 Contract Duration ICT Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/009 Contract Duration Program Officer Actua is 24 Months 89,100 July 2016 l 8 MCDSW/ Plan IC 89,100 Post Nov 2015 C/010 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/011 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/012 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/013 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 97,200 Post April 2016 C/014 Program Contract Duration Actua Accountant is 24 Months l 97,200 April 2016 MCDSW/ Assistant Plan IC 77,760 Post Nov 2015 C/015 Accountant Contract Duration Actua is 24 Months l 77,760 July 2016 MCDSW/ Plan Notes: assignment QBS 1,300,000 Prior May 2016 C/016 will include Actua finalizing SWL l training curriculum, design of communications strategy for Consultancy to outreach support roll out and awareness raising implementation of and support for SWL implementation of SWL activities (Short list will comprise for profit and not for profit firms i.e. Private sector and NGOs hence use of QBS) MCDSW/ Design of and Plan CQS 90,000 Post Jan 2016 C/017 operational guidelines for Actua targeting and l identification of 9 SWL beneficiaries MCDSW/ Development of Plan CQS 120,000 Post Jan 2016 C/018 strategy and tools for SWL GRS, and Actua support to launch l and operate the GRS MCDSW/ Plan IC 60,000 Post June 2016 C/019 Strategy for harmonization of Actua MCDSW l empowerment/liveli hood programs MCDSW/ Plan January Implementation QCBS 200,000 Post C/020 2017 evaluation and Actua beneficiary l satisfaction survey MCDSW/ Plan QCBS 1,030,000 Prior June 2016 C/021 Impact evaluation data collection Actua l Sub Total Component 1; Consulting 5,702,06 Services 0 Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education ) Assessment for the Plan IC 45,000 Post Sept 2015 MGE/C/0 identification of 01 technological Actua innovations l MGE/C/0 Development of a Plan IC 50,000 Post Dec 2015 02 beneficiary awareness strategy Actua for Keeping Girls in l School MGE/C/0 Design of Plan QCBS 200,000 Prior Jan 2016 03 Complaints & Grievance Mechanism for the Actua Keeping Girls in l School Initiative MGE/C/0 Plan CQS 60,000 Post Sept 2016 04 Actua TA to harmonize existing bursary l and assessment, strategy MGE/C/0 Support to Plan CQS 51,000 Post March 05 implement the 2017 action plan to harmonize existing 10 secondary school Actua support schemes l MGE/C/0 Information System Plan QCBS 500,000 Prior February 06 Module, 2016 Development of the software to capture real time information in the field and testing of Real time Data Sub Total Component 2: Consulting Actual 906,000 Services Component 3 (a). Institutional Strengthening and Systems Building: (Ministry of Gender) MOG/C/ Development of a Plan CQS 50,000 Post Oct 2015 01 monitoring Actua framework l MOG/C/ Development of Plan CQS 100,000 Post Jun 2016 02 software for a M&E Actua and evaluation l system MOG/C/ Technical Plan CQS /IC 100,000 Post Sept 2015 Various over the 03 assistance to the life of the project. National Secretariat Actua Activity may be for project l split when defined management Sub Total Component 3(a): 250,000 Consulting Services Component 3 (b). Institutional Strengthening and Systems Building: (Ministry of Community Development and Social Welfare MCDS Development of M&E Plan CQS 150,000 Prior Aug 2015 W/C/01 framework Actua l MCDS Development of a Plan QCBS 350,000 Prior July 2016 W/C/02 MIS module for SWL and non formal Actua Literacy l MCDS Enhancement of Plan CQS 150,000 Prior Jan 2017 W/C/03 MIS/SRB Actua l MCDS Update the training Plan IC 20,000 Post March W/C/04 strategy for MCDSW 2016 staff in M&E and Actua develop a strategy l 11 for capacity development in policy analysis MCDS Updating Operations Plan CQS 100,000 Post Dec 2015 W/C/05 Manuals Actua l MCDS Assessment of Actua CQS 100,000 Post Jul 2016 W/C/06 options to l identifying Plan beneficiaries of NRCs, MCDS Inventory of existing Plan CQS 40,000 Jan 2016 W/C/07 complimentary Post activities Actua l MCDS Software design and Actua CQS 150,000 Feb March W/C/08 implementation l Post Plan MCDS TA to National Plan IC 40,000 Post Oct 2016 W/C/10 Social Protection Co- Various TA Actua ordination Unit, l MCDS Development of a Plan IC 15,000 Post Jan 2016 W/C/9 strategy for good Actua practice l Sub Total Component 3 (b): 1,115,00 Consulting Services 0 III. Training, workshops and consultations Estimated Ref. Training, workshop Estimated Expected Duration No. and study tours Cost (US$) Training/workshop (Days) Component 1: Supporting Women’s Livelihoods(Ministry of Community Development and Social We Sub-component 1a – Adoption and Roll-out of SWL MCDSW/T/01 Training of Trainers (ToT) 2,416,000 Recurrent (July 2016; Ju workshop 2017; July 2018) MCDSW/T/02 1,172,000 Recurrent (July-Feb 201 Training of beneficiaries in life, July-Feb 2017/8; July-Fe business and savings 2018/9) 12 MCDSW/T/03 Training of beneficiaries in agri- 186,000 Recurrent (Sept-Feb 20 business and other sector- Sept-Feb 2017/8; Sept-F specific topics 2018/9) MCDSW/T/04 Recurrent (September 2 Provision of safe space for September 2017; Septe training and follow-up meetings 375,000 2018) MCDSW/T/05 Launching and operation of GRS 735,000 Recurrent MCDSW/T/06 Launching and operation of ICT- Recurrent (August 2016 based learning tools 325,000 August 2017, August 20 MCDSW/T/07 Launching and Equipment for operation of GRS 100,000 MCDSW/T/08 Launching and operation of ICT- based learning tools 125,000 Sub-component 1b – Building National Implementation and Monitoring Capacity MCDSW/T/009 Workshop for preparation of the March 2016 Operations Manual 20,000 MCDSW/T/010 Training of DCD staff on POM Recurrent and training curriculum 60,000 MCDSW/T/11 Training of DCD staff on Recurrent (August 2016 beneficiary enumeration and August 2017; August 20 registration 50,000 MCDSW/T/12 Training of DCD staff on Recurrent (August 2016 monitoring and reporting 50,000 August 2017; August 20 MCDSW/T/13 Recurrent (March 2017; Annual review 30,000 2018; March 2019) MCDSW/T/14 Training of HQ and district staff Recurrent (April-August training prior to SWL activities 270,000 2017, 2018) MCDSW/T/15 Study tours to learn from international experience in the implementation of livelihood support programs 100,000 MCDSW/T/16 Capacity Building of SWL Staff in January 2017 Bank Procurement and regulations and implementation 150,000 Institutional Strengthening and Systems Building MCDSW/T/14 South-south exchange on social 35,000 May 2016 protection policy and implementation issues. Sub Total Training , Workshops and Capacity 6,199,000 Building Component 1 Supporting Women’s Livelihoods(Ministry of Community Development and Social Welfare Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education) Sub-component 2b - System Strengthening and Consolidation Training Plan for MGE to implement the Keeping Girls in MGE /T/01 School initiative 40,000 March 2016 to May 201 13 MGE /T/02 Training of staff as per the training plan 135,000 Feb 2017 MGE /T/03 Training of the primary users of the Keeping Girls in School Information System Module 25,000 Dec 2015 MGE /T/04 Workshops and consultations for the action plan. 20,000 Feb 2017 MGE /T/05 South-south exchange on Keeping Girls in School initiative. 70,000 Dec 2016 MGE /T/06 Sharing of lessons learned between district officers 124,000 June 2016 – Sept 2020 Sub Total Training , Workshops and Capacity 414,000 Building Component 2 Subcomponent 2c: - System Strengthening for MCDSW to support Keeping Girls in School Initiativ MCDSW/T/15 Trainers of Trainers 100,000 November 2015 workshop for District Social Welfare Officers to train officers in the implementation of the Project MCDSW/T/16 Awareness raising and 25,000 November – December sensitization of Community onwards Welfare Assistance Committees (CWACs) MCDSW/T/17 Conduct inception visits to 65,000 December 2015 respective Districts and communities for programme buy-in particularly from traditional leaders, District Government officials and other stake holders. MCDSW/T/18 Hold a workshop to develop 10,000 November 2015 protocols for the implementation of the programme MCDSW/T/19 Verification of Girls on the 70,000 December 2015 list (Headcount) both in communities and villages. MCDSW/T/20 Quality Assurance, 130,000 March 2016 onwards Monitoring and mentoring of girls in school MCDSW/T/21 Follow up on girls in school 100,000 January 2016 by the CWACs, Districts, Provincial offices and Headquarters. MCDSW/T/22 Monitoring and supervision 171,250 March 2016 of follow up outcomes by the districts, provincial offices and Headquarters 14 MCDSW/T/23 Hold community validation 71,250 December 2015 meetings to provide feedback on enlisted girls Sub Total Subcomponent 2c 742,500 System Strengthening for MCDSW to support Keeping Girls in School Initiative Component 3 a). Institutional Strengthening and Systems: (Ministry of Gender ) MOG /T/01 Training of the primary users 50,000 Sept 2016 – March 2 of the monitoring and evaluation system in MOG MOG /T/02 Competency-based training 70,000 in co-ordination skills, gender analysis and gender mainstreaming June 2016 – Dec 20 MOG /T/03 Learning exchange on 70,000 empowerment programs March 2016 – May 2 MOG /T/04 Short-course local training of 4,000 staff in Project Management- 4 Staff Jan 2016 – June 20 MOG /T/05 Regional staff training in 28,000 impact evaluation • Master of Arts in Economic Policy Management – 2 Staff • Advanced M & E; Integrating Planning, Implementation, Budgeting, M&E-2 Staff • Project Management – 3 Staff Jan 2016 – Dec 20 MOG /T/06 Training of at least 10 65,000 district gender sub- committees per province in all 10 provinces in national provincial centres Jan 2016- Dec 201 MOG/T/07 Competency-based training 20,000 in Women Economic Entrepreneurship skills Nov - Dec 2016 Sub Total Training , Workshops and Capacity 327,000 Building Component 3(a) Component 3 a). Institutional Strengthening and Systems: (Ministry of Community Development ) MCDSW/T/01 Training and support for 90,000 Jun 2016 – Dec 2019 capacity development in line with training strategy for senior, middle-level and operational staff in MCDSW 15 MCDSW/T/02 Training of the primary users 10,000 May 2017 – Aug 2017 of the unique identification solution Sub Total Training , Workshops and Capacity Building Component 3(a) 100,000 GENERAL NOTES 1. Training and capacity building: The institutions charged with implementation responsibility for the componentswill identify the total cost of required training and prepare and submit to the Bank, for its prior review, a detailed training program. The training program will, inter alia, identify: (i) the training envisaged; (ii) the justification for the training, how it will lead to effective performance and implementation of the project (iii) the personnel to be trained; (iv) the selection methods of institutions or individuals conducting such training; (v) the institutions which will conduct training, if already selected; (vi) the duration of proposed training; and (vii) the cost estimate or specified cost of the training. Preparation and submission of a report, including to the Bank by the trainee upon completion of training would be mandatory. 2. Operating costs: For this project, the Bank has agreed with the implementing agencies of the various components that the procurement methods for works, goods and non-consulting services as described in the Procurement Guidelines do not have to be followed for payments made for operating costs arising from the implementation of the project. Instead, the Bank has assessed the Governments and other implementing agency own procurement and administrative procedures for these expenditures (during appraisal) and agrees that these procedures are adequate for procuring items for operating costs. The operating costs constitute recurrent costs (excluding purchase of motor vehicles, computers etc.) and typically include equipment rental and maintenance, vehicle operating costs, maintenance and repair, office rental and maintenance, office materials and supplies, utility costs (including electricity, water and gas) communications (including telephone and internet charges) equipment rent, operation and maintenance and cost of banking services (bank charges), travel cost and transport of the staff associated with project implementation. The Project Appraisal Document (PAD) and the Financing Agreement (FA) will include a list of the eligible items to be covered under the project. These items will be procured using the implementing Government agency’s administrative procedures, which have been reviewed and found acceptable to the Bank. Contracts for these items should not be included in the procurement plan. 16 PROCUREMENT Zambia : Girls Education and Womens Empowerment and Livelihood Project PLAN General Information Country: Zambia Bank’s Approval Date of the Original Procurement Plan: 2021-02-02 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151451 GPN Date: Project Name: Girls Education and Womens Empowerment and Livelihood Project Loan / Credit No: IDA / 65690 Ministry of Community Development and Social Services-SCT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MCDSS/SCT/3/003/21 / Pending Request for Single Stage - One Procurement of Money Safes IDA / 65690 Keeping Girls in School Post Limited 82,000.00 0.00 Implementati 2021-02-17 2021-04-14 2021-10-11 Quotations Envelope for the Districts on MCDSS/SCT/004/4/21 / Pending Procurement of 36 Executive Request for Single Stage - One IDA / 65690 Keeping Girls in School Post Limited 70,000.00 0.00 Implementati 2021-02-24 2021-04-21 2021-10-18 Tables and Chairs, 50 Filling Quotations Envelope on cabinets MCDSS/SCT/008/21 / Procurement and supply of Pending Request for Single Stage - One Navision User Licenses, Visual IDA / 65690 Keeping Girls in School Post Limited 95,000.00 0.00 Implementati 2021-03-03 2021-04-28 2021-10-25 Quotations Envelope Private Network and on Operating software MCDSS/SCT/007/7/21 / Pending Single Stage - One Procurement of 45 Motor IDA / 65690 Keeping Girls in School Post Request for Bids Open - National 280,000.00 0.00 Implementati 2021-02-28 2021-03-05 2021-04-16 2021-05-16 2021-06-20 2021-12-17 Envelope Bikes for the SCT Districts on MCDSS/SCT/006/21 / Pending Single Stage - One Procurement of 5000 Bicycles IDA / 65690 Keeping Girls in School Post Request for Bids Open - National 554,585.00 0.00 Implementati 2021-02-26 2021-03-03 2021-04-14 2021-05-14 2021-06-18 2021-12-15 Envelope for the SCT Districts on MCDSS/SCT/005/5/21 / Pending Single Stage - One Procurement of 2 Boats for IDA / 65690 Keeping Girls in School Post Request for Bids Open - National 150,000.00 0.00 Implementati 2021-02-26 2021-03-03 2021-04-14 2021-05-14 2021-06-18 2021-12-15 Envelope SCT on MCDSS/SCT/010 / Pending Single Stage - One Procurement of 120 Desktop IDA / 65690 Keeping Girls in School Post Request for Bids Open - National 185,000.00 0.00 Implementati 2021-02-26 2021-03-03 2021-04-14 2021-05-14 2021-06-18 2021-12-15 Envelope Computers and 35 Laptops on MCDSS/SCT/014/21 / Pending Request for Single Stage - One Procurement of various COVID IDA / 65690 Keeping Girls in School Post Limited 43,000.00 0.00 Implementati 2021-04-05 2021-05-31 2021-11-27 Quotations Envelope 19 Materials on MCDSS/SCT/012/21 / Pending Request for Single Stage - One Procurement of 1,300 smart IDA / 65690 Keeping Girls in School Post Limited 140,600.00 0.00 Implementati 2021-04-21 2021-06-16 2021-12-13 Quotations Envelope mobile phones on MCDSS/SCT/016/2021 / Pending Single Stage - One Procurement of 15 4 x 4 IDA / 65690 Keeping Girls in School Post Request for Bids Open - National 735,000.00 0.00 Implementati 2021-05-14 2021-05-19 2021-06-30 2021-07-30 2021-09-03 2022-03-02 Envelope Double Cab Motor Vehicles on MCDSS/SCT/017/21 / Pending Request for Single Stage - One Procurement of 1,300 Power IDA / 65690 Keeping Girls in School Post Limited 71,000.00 0.00 Implementati 2021-05-12 2021-07-07 2022-01-03 Quotations Envelope Banks on MCDSS/SCT/018/21 / Pending Procurement of solar power Request for Single Stage - One IDA / 65690 Keeping Girls in School Post Limited 30,000.00 0.00 Implementati 2021-05-19 2021-07-14 2022-01-10 batteries and charger Quotations Envelope on controllers MCDSS/SCT/013/21 / Pending Procurement of 5700 mobile Single Stage - One IDA / 65690 Keeping Girls in School Post Request for Bids Open - National 900,000.00 0.00 Implementati 2021-04-09 2021-04-14 2021-05-26 2021-06-25 2021-07-30 2022-01-26 smart phones and power Envelope on banks for SCT MCDSS/SCT/019/21 / Pending Request for Single Stage - One Procurement of aluminum IDA / 65690 Keeping Girls in School Post Limited 85,000.00 0.00 Implementati 2021-06-02 2021-07-28 2022-01-24 Quotations Envelope partitioning on Pending MCDSS/SCT/022/21 / Supply Request for Single Stage - One IDA / 65690 Keeping Girls in School Post Limited 70,000.00 0.00 Implementati 2021-06-16 2021-08-11 2022-02-07 and Delivery of Servers Quotations Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending MCDSS/SCT/009/21 / Request for Single Stage - One IDA / 65690 Keeping Girls in School Post Limited 20,000.00 0.00 Implementati 2021-03-03 2021-04-28 2021-10-25 Networking of SCT Offices Quotations Envelope on MCDSS/SCT/002/21 / Tender Pending for the engagement of Mobile IDA / 65690 Keeping Girls in School Post Direct Selection Direct 288,654.55 0.00 Implementati 2021-03-26 2021-03-31 2021-05-05 2021-11-01 Network Operators (MNOs) for on the payment of beneficiaries Page 1 MCDSS/SCT/011/21 / Tender Pending for the engagement of banks IDA / 65690 Keeping Girls in School Post Direct Selection Direct 96,218.18 0.00 Implementati 2021-03-26 2021-03-31 2021-05-05 2021-11-01 for the payment of Social Cash on Grants MCDSS/SCT/015/21 / Pending Printing of Disability Request for Single Stage - One IDA / 65690 Keeping Girls in School Post Limited 13,000.00 0.00 Implementati 2021-05-19 2021-07-14 2022-01-10 Certification and chronic Quotations Envelope on illness books CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MCDSS/SCT/023/21 / Consultancy Services for the Quality And Cost- Under Impact Evaluation for the IDA / 65690 Keeping Girls in School Prior Open - International 2,000,000.00 0.00 2021-06-01 2021-06-04 2021-06-22 2021-06-18 2021-08-05 2021-09-02 2021-10-02 2021-11-06 2021-12-11 2022-12-11 Based Selection Implementation Social Cash Transfer (SCT) program INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MCDSS/SCT/C/001/21 / Individual Consultancy services for Pending IDA / 65690 Keeping Girls in School Post Consultant Limited 150,000.00 0.00 2021-02-26 2021-03-03 2021-03-24 2021-04-28 2021-10-25 capacity building in financial Implementation Selection management MCDSS/SCT/020/21 / Individual Consultancy services for the Pending IDA / 65690 Keeping Girls in School Post Consultant Open 78,000.00 0.00 2021-05-28 2021-07-16 2021-08-06 2021-09-10 2022-03-09 engagement of a Payment Implementation Selection Specialist MCDSS/SCT/021/21 / Individual Consultancy services for the Pending IDA / 65690 Keeping Girls in School Post Consultant Open 64,800.00 0.00 2021-05-28 2021-07-16 2021-08-06 2021-09-10 2022-03-09 engagement of a Management Implementation Selection and Implementation Officer Page 2 PROCUREMENT CAPACITY ASSESSMENT FOR IMPLEMENTING A PPA for the COMOROS HEALTH AND NUTRITION SYSTEM SUPPORT FOR UNIVERSAL HEALTH COVERAGEPROJECT (P166013) 1. The PPA is 1.0M USD. The“Unité de Gestion de Projet Santé Comores” as implementing agency is concerned by this assessment. 2. The Assessment would assist the TTL to determine prior actions to ensure that procurement capacity is addressed adequately. 3. TheAdvances would be Recipient-executed through the Unité de Gestion de Projet Santé Comores acting as agency. 4. The Recipient isa Government’sDepartment with fiduciary function. It is a Ministry of Health department The Checklist for Procurement Assessment THEME Item to be Assessment Action required by Estimated Recipient assed Recipient time/date Official for responsi completion ble for of action action (A). 1 Does the No Nomination or Waiting for MOH EXISTENCE Recipient has a recruitment of a decision OF person or a procurement officer Before PPA PROCUREM unit with performanc ENT persons e PERSONNEL qualified to process procurement? (B) 1 Is there a No The new project would PPA MOH ADEQUACY manual of be governed by the performanc OF procurement New procurement e NATIONAL procedures framework. The Project PROCUREM Implementing Manual ENT should be drafted to PROCEDUR reflect the ES OF THE requirements of NPF RECIPIENT 1 and starting with the PPA implementation 2 Do Procedures YES,in general No action required allow foreign for Comoros bidders to Procurement participate in law competition 3 Are there some YES The Government After MOH key gaps procurement law is finalization between the not entirely in line of the PIM Bank with regulations and 1Assessment of national procurement procedures is required only when NCB procurement is to be carried out under the project. THEME Item to be Assessment Action required by Estimated Recipient assed Recipient time/date Official for responsi completion ble for of action action regulations and the gap would be the addressed in the Government PIM. However the legislation Project would be governed by Bank’s regulations (C) 1 Is there a No To be addressed During PPA MOH INTERNAL defined within the PIM performanc CONTROLS procedure for e making decisions in award of contracts, other approvals and enforcement 2 Timeliness of No record To be addressed within During PPA MOH payments to the PIM performanc suppliers, e contractors and consultants (not acceptable if more than 45 days). 3 Are YES To be addressed within During PPA MOH procurement the PIM performanc records kept in e an adequate manner Overall Assessment Summary and actions required. The overall rating of the procurement risk is HIGH This assessment was conducted by Sylvain Rambeloson, Senior Governance Procurement Specialist on July 12th 2018 PLAN DE PASSATION DE MARCHES A-TRAVAUX, FOURNITURES ET SERVICES DE NON CONSULTANTS 1. Seuil de Revue préalable : Les seuils requis pour les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le circulaire du 30 mai 2017 Méthode de Passation de Seuil de revue à Commentaires marchés priori Fournitures 1. AOI / AOIR >1,500,000$ M>500.000 2. AON Néant M<500.000 3. Cotation Néant M<100,000 4. UNOPS >1,500,000 Travaux 4. AOI >5,000,000 M>3,000,000 5. AON Néant M<3,000,000 6. Demande de devis Néant M<200,000 7. Entente directe Même que AOI 2. Pré-qualification Les soumissionnaires pour _____________ seront pré- qualifiés selon les dispositions des paragraphes 2.9 et 2.10 des Directives. N/A 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 3.17 des Directives : N/A 4. Référence (s’il y en a) au Manuel d’exécution du projet/ Manuel de Passation de marchés : Manuel à élaborer pour le besoin du Projet 5. Tout autre arrangement spécial en passation de marchés : Néant 6. Allotissement de fournitures avec méthodes et calendrier : 1 2 3 4 5 6 7 8 9 Pré- Préféren Revue de Date qualificatio ce la prévue Coût Méthode n nationale Banque Réf. d’ouvertur Commentair Description Contrat estimat de (à priori No e des es if (en $) sélection /à Oui / Non Oui / Non soumissio posterior ns i) 01 Acquisition de matériels 82.000 Entente Non Non A informatiques directe posterior (ordinateurs de bureau, UNOPS/CF i ordinateurs portables, photocopieuses, vidéoprojecteurs, tablettes, flash-disk,...) et matériels de bureau A Réhabilitation du local 02 60.000 CF Non Non postérior UGP i A Acquisition de logiciel 03 22.000 CF Non Non postérior comptable i A 04 Acquisition de mobilier 25.000 CF Non Non postérior i A Acquisition de trois 110.00 05 AON Non Non postérior véhicules 0 i TOTAL Fournitures et 299,00 Travaux 0 B-SELECTION DE CONSULTANTS 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans l'Annexe 1 des Directives Sélection et Emploi de consultants : Méthode de sélection Seuil de revue à Commentaires priori 1. Toute méthode de sélection confondue pour la sélection et le >500,000 recrutement de cabinets de consultant 2. Toute méthode de sélection confondue pour la sélection et le >200,000 recrutement de consultants individuels 3. 4. 5. 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de $ 100 000 par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 2.7 des directives de sélection de consultants. 3. Tout autre arrangement spécial de Sélection de consultants : [y compris passation de marchés anticipée et financement rétroactif, si applicable] : N/A 4. Tâches de consultation avec des méthodes de sélection et calendrier 1 2 3 4 5 6 7 Date prévue Revue de la Coût Méthode de Description des Banque (à Commentair Réf. No. estimatif de soumission missions priori / à es (en $) sélection des posteriori) propositions T0+1mois C001 Preparation du CGES 14,000 SFQC Post Mars 2019 Préparation du MEP, 30,000 SFQC Post Août2019 T0+5 mois C002 MOP et SPMPD Recrutement du SCI Mars 2019 C003 24,000 Post T0+1 mois Coordonnateur. Recrutement du SCI Post Mars 2019 T0+1 mois C004 Responsable en 14,000 passation de marchés Recrutement du SCI Post Mars 2019 T0+1 mois C005 Responsable en gestion 14.000 financière Recrutement du SCI Post Mars 2019 T0+1 mois C006 Responsable en Suivi et 14.000 évaluation Élaboration de la stratégie de la C007 formation (Clinique, 60 000 SCI Post Avril 2019 management, Gestion de projet) Analyse de la situation SCI Post Avril 2019 dans les trois îles (Équipement, C008 40 000 infrastructures, besoins en formation du personnel, etc..) Élaboration de manuel C009 90.000 Norme et Standards C010 Audit externe 15.000 SMC Avril 2019 Conceptions Post Avril 2019 architecturales et SFQC techniques et devis C011 84 000 quantitatifs pour la rénovation des installations Développement de la Post C012 stratégie et du plan de 40 000 SCI Juin 2019 communication Enquête de référence Post C013 et stratégie de Suivi et 120 000 SCI Mars 2019 Évaluation Recrutement du Responsable SCI C014 Sauvegarde 5.500 Environnementale et Sociale et autres Staff Recrutement Assistant SCI C015 3,000 de Direction Recrutement Personnel SCI d’appui (3 chauffeurs, C016 7,500 01 technicien de surface, 01 gardien,…) Recrutement Assistant SCI C017 3000 fiduciaire/comptable TOTAL CONSULTANCE 578.000 C- FORMATION et Atelier Date Revue de la prévue de Coût Méthode Banque (à soumissio DÉSIGNATION estimat de Commentaires priori / à n des if (en $) sélection posteriori) propositio ns F0 Formation Fiduciaire du 20,000 Post NA 1 personnel UEP F0 Préparation du PPSD 3.000 Post 2 F0 Ateliers d’appropriation et 10 000 Post 3 d’opérationnalisation TOTAL 33,000 D-COUTS D’OPERATION Date Revue de la prévue de Coût Méthode Banque (à soumissio DÉSIGNATION estimat de Commentaires priori / à n des if (en $) sélection posteriori) propositio ns Frais de fonctionnement y compris loyer et location 90.000 Shopping A posteriori NA véhicule TOTAL 90.000 E-RECAPITULATION A Fourniture 299.000 B Consultants 578.000 C Formation et Atelier 33.000 D Coûts d’opération 90.000 1.000.000 Acronymes : AOI : Appel d’Offre International AON : Appel d’Offre National DC : Demande de Cotation SCBD : Sélection dans le cadre d’un budget déterminé SED : Sélection par entente directe SFQC : Sélection Fondée sur la Qualité et le Cout SMC : Sélection au « moindre coût » SQC : Sélection fondée sur les qualifications des consultants PROCUREMENT Comoros : Comprehensive Approach to Health System Strengthening PLAN General Information Country: Comoros Bank’s Approval Date of the Original Procurement Plan: 2019-08-22 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166013 GPN Date: 2020-07-31 Project Name: Comprehensive Approach to Health System Strengthening Loan / Credit No: IDA / V2780, IDA / 64670, IDA / D5050 H Executing Agency(ies): ealth and Nutrition Project Implementation Unit WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Citizen Engagement and KM-UGP SN-125482-CW- Empowerment, Project Request for Single Stage - One 2019-12- RFQ / Réhabilitation du local IDA / V2780 Post Limited 60,000.00 47,274.27 Signed 2019-08-28 2019-10-12 2019-10-23 2020-01-13 Management, Monitoring and Quotations Envelope 22 du projet Evaluation, GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-UGP SN-125481-GO- RFQ / Acquisition de matériels informatiques pour le projet: Citizen Engagement and ordinateurs portables et fixes, Empowerment, Project Request for Single Stage - One IDA / V2780 Post Limited 82,000.00 20,552.41 Terminated 2019-08-27 2020-01-14 2019-10-22 2020-03-02 2019-11-21 imprimantes et Management, Monitoring and Quotations Envelope photocopieurs, vidéo Evaluation, projecteurs, écran plasma, tablettes, flash-disk,........ KM-UGP SN-125651-GO- Citizen Engagement and RFQ / Acquisition du logiciel Empowerment, Project Request for Single Stage - One IDA / V2780 Post Limited 11,000.00 49,032.41 Signed 2019-09-04 2019-12-03 2019-10-30 2020-04-08 2019-11-29 de gestion du projet Management, Monitoring and Quotations Envelope notamment comptable Evaluation, Citizen Engagement and KM-UGP SN-126008-GO- Empowerment, Project Request for Single Stage - One RFQ / Acquisition des IDA / V2780 Post Limited 25,000.00 16,847.21 Signed 2019-08-27 2019-11-15 2019-10-22 2020-04-10 2019-12-06 Management, Monitoring and Quotations Envelope mobiliers des bureau Evaluation, Citizen Engagement and KM-UGP SN-126265-GO-UN Empowerment, Project UN Agencies / Acquisition des véhicules IDA / V2780 Post Direct 103,000.00 86,606.35 Signed 2019-08-22 2019-09-02 2019-08-27 2019-08-30 2019-10-01 2019-10-29 2019-11-30 Management, Monitoring and (Direct) pour le projet Evaluation, KM-UGP SN-168360-GO- RFQ / Acquisition des matériels informatiques et Citizen Engagement and consommable pour soutenir Empowerment, Project Request for Single Stage - One IDA / V2780 Post Limited 17,419.00 20,552.41 Signed 2020-04-13 2019-10-18 2020-04-13 2020-03-02 2020-04-14 les activités de lutte contre la Management, Monitoring and Quotations Envelope propagation de COVID-19 aux Evaluation, Comores dans le cadre du projet COMPASS Citizen Engagement and KM-UGP SN-168363-GO- Empowerment, Project Request for Single Stage - One RFQ / Achat des IDA / V2780 Post Limited 1,110.00 0.00 Canceled 2020-04-13 2020-04-13 2020-04-14 Management, Monitoring and Quotations Envelope consommables bureautiques Evaluation, KM-UGP SN-168376-GO- RFQ / Acquisition matériels et équipements pour les sites de Citizen Engagement and Under quarantaine et les points Empowerment, Project Request for Single Stage - One IDA / V2780 Post Limited 100,721.00 26,572.32 Implementati 2020-04-13 2020-04-13 2020-04-13 2020-04-14 d'entrée pour lutter contre la Management, Monitoring and Quotations Envelope on propagation du COVID-19, Evaluation, dans le cadre du projet COMPASS KM-UGP SN-168384-GO-DIR / Acquisition de fourniture de communication pour assurer Citizen Engagement and la sensibilisation et la Empowerment, Project IDA / V2780 Post Direct Selection Direct 45,000.00 19,385.68 Signed 2020-04-13 2020-04-14 2020-04-13 2020-04-13 2020-04-14 2020-04-16 2020-04-15 communication de la Management, Monitoring and population pour la lutte Evaluation, contre la propagation du COVID19, dans le cadre du COMPASS KM-UGP SN-168385-GO- Citizen Engagement and RFQ / Acquisition matériels et Pending Empowerment, Project Request for Single Stage - One équipements d'hygiène pour IDA / V2780 Post Limited 24,514.00 0.00 Implementati 2020-04-13 2020-04-13 2020-04-15 Management, Monitoring and Quotations Envelope lutter contre la propagation on Evaluation, de COVID19 KM-UGP SN-172119-GO-DIR / Acquisition de matériels médicaux dans le cadre de la Contingent Emergency IDA / 64670 Post Direct Selection Direct 1,448,769.32 1,448,769.32 Signed 2020-05-05 2020-05-08 2020-05-06 2020-04-27 2020-05-06 2020-05-05 2020-08-10 lutte contre la propagation du Response Component COVID19 en Union des Comores. KM-UGP SN-177152-GO-DIR / Achats de 20 Respirateurs à compression intégrée, dans le cadre de la Composante Contingent Emergency IDA / 64670 Post Direct Selection Direct 288,246.00 0.00 Canceled 2020-06-05 2020-06-10 2020-07-15 2020-10-13 d'intervention d'urgence CERC Response Component du projet COMPASS pour la lutte contre le COVID 19 aux Comores Page 1 KM-UGP SN-177180-GO-DIR / Acquisition de 50 nébulisateurs dans le cadre de Pending Contingent Emergency la composante d'interventions IDA / 64670 Post Direct Selection Direct 107,571.00 0.00 Implementati 2020-06-10 2020-06-15 2020-07-20 2020-10-18 Response Component d'urgence (CERC) du projet on COMPASS pour lutter contre le COVID-19 aux Comores KM-UGP SN-177272-GO-UN / Acquisition des ambulances Under médicalisés dans le cadre de Contingent Emergency UN Agencies IDA / 64670 Post Direct 280,899.00 0.00 Implementati 2020-06-08 2020-06-08 2020-06-13 2020-07-18 2021-01-14 la lutte contre le COVID-19 à Response Component (Direct) on travers la composante CERC du projet COMPASS KM-UGP SN-177275-GO-UN / Acquisition des ambulances médicalisées dans le cadre de Improve PHC infrastructure, Pending UN Agencies la fourniture des matériels et IDA / 64670 workforce and service Post Direct 348,000.00 0.00 Implementati 2020-06-08 2020-06-13 2020-07-18 2021-01-14 (Direct) véhicule de soins de santé delivery platforms on primaire (composante1) du projet COMPASS KM-UGP SN-177278-GO-UN / Acquisitions de 17 véhicules pour les centres de santé de Improve PHC infrastructure, districts et 4 véhicules pour UN Agencies IDA / 64670 workforce and service Post Direct 735,000.00 580,523.46 Signed 2020-06-08 2020-06-07 2020-06-13 2020-06-10 2020-07-18 2020-06-18 2021-01-14 les directions de santé (Direct) delivery platforms régionale de santé, dans le cadre de la composante1 du projet COMPASS KM-UGP SN-177282-GO-UN / Acquisition des 4 véhicules de type fourgonnette pour Strengthening institutions appuyer l'OCOPHARMA dans and governance which are Pending UN Agencies le cadre de la composante 2 IDA / 64670 critical to (i) quality PHC and Post Direct 122,460.00 0.00 Implementati 2020-06-08 2020-06-13 2020-07-18 2021-01-14 (Direct) du projet COMPASS pour le (ii) response to disease on renforcement des institutions outbreaks au service de la qualité et pour les réponses épidémiques KM-UGP SN-177283-GO-DIR / Acquisition de 5 Extracteurs d’oxygène avec branchement murail dans le cadre de la Contingent Emergency Composante d'Intervention IDA / 64670 Post Direct Selection Direct 410,096.00 325,075.00 Signed 2020-06-10 2020-06-05 2020-06-15 2020-05-30 2020-07-20 2020-06-08 2020-10-18 Response Component d'Urgence Contingent (CERC) du projet COMPASS, pour la lutte contre le COVID-19 aux Comores KM-UGP SN-177317-GO-DIR / Acquisition de 12 masques d’oxygène simple et à forte concentration dans le cadre Contingent Emergency IDA / 64670 Post Direct Selection Direct 51,637.00 42,490.00 Signed 2020-06-09 2020-06-01 2020-06-14 2020-06-08 2020-07-19 2020-08-12 2020-10-17 de la Composante Response Component d'intervention d'Urgence (CERC)du projet COMPASS pour la lutte contre le COVID- 19 aux Comores. KM-UGP SN-177332-GO-DIR / Acquisition des masques chirurgicaux pour tous les sites dans le cadre de la Contingent Emergency Composante d'Intervention IDA / 64670 Post Direct Selection Direct 132,726.00 206,550.00 Signed 2020-06-11 2020-06-01 2020-06-16 2020-06-02 2020-07-21 2020-07-07 2021-01-17 Response Component d'Urgence Contingent (CERC) du projet COMPASS pour lutter contre le COVID-19 aux Comores KM-UGP SN-177462-GO-DIR / Acquisition des Kit de test GeneXpert et écouvillons dans Pending le cadre de la composante Contingent Emergency UN Agencies IDA / 64670 Post Direct 42,729.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-09-23 d'intervention d'urgence Response Component (Direct) on (CERC) du projrt COMPASS pour la lutte contre le COVID- 19 aux Comores KM-UGP SN-177463-GO-DIR / Acquisition de 4 réfrigérateurs de laboratoire pour la conservation des Pending Contingent Emergency échantillons dans le cadre de IDA / 64670 Post Direct Selection Direct 7,191.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-09-23 Response Component la composante d'intervention on d'urgence du projet COMPASS pour lutter contre le COVID- 19 aux Comores KM-UGP SN-177464-GO-DIR Pending / Acquisition de 4 Armoires Contingent Emergency IDA / 64670 Post Direct Selection Direct 2,697.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2021-01-21 de biosécurité et bio sureté Response Component on classe II KM-UGP SN-177466-GO-UN / Acquisition de 7 incinérateurs électrique mobile dans le cadre de la Contingent Emergency UN Agencies IDA / 64670 Post Direct 235,955.00 399,502.47 Signed 2020-06-10 2020-06-01 2020-06-15 2020-06-16 2020-07-20 2020-06-29 2020-10-18 composante d'intervention Response Component (Direct) d'urgence du projet COMPASS pour la lutte contre le COVID- 19 aux Comores KM-UGP SN-177496-GO-DIR / Acquisition EPI standard : blouse, botte, combinaison, lunettes,……., dans le cadre Contingent Emergency de la composante IDA / 64670 Post Direct Selection Direct 96,392.00 0.00 Canceled 2020-06-10 2020-06-15 2020-07-20 2020-10-18 Response Component d'intervention d'urgence du projet COMPASS pour lutter contre le COVID-19 aux Comores KM-UGP SN-177502-GO-UN Contingent Emergency UN Agencies / Acquisition de groupes IDA / 64670 Post Direct 22,472.00 23,513.68 Signed 2020-06-15 2020-06-01 2020-06-20 2020-06-15 2020-07-25 2020-06-29 2021-01-21 Response Component (Direct) électrogène de 22-30kva Page 2 KM-UGP SN-177856-GO-UN Improve PHC infrastructure, / acquisition incinérateur UN Agencies IDA / 64670 workforce and service Post Direct 100,000.00 0.00 Canceled 2020-06-15 2020-06-20 2020-07-25 2021-01-21 dans le cadre du projet (Direct) delivery platforms COMPASS KM-UGP SN-177898-GO-UN / Acquisition des groupes électrogène pour assurer la fourniture régulière de Pending Contingent Emergency UN Agencies l'électricité, dans le cadre de IDA / 64670 Post Direct 94,382.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2021-01-21 Response Component (Direct) la composante d'intervention on d'urgence (CERC) du projet COMPASS pour lutter contre le COVID-19 aux Comores KM-UGP SN-177178-GO-DIR / Acquisition d'oxymètre de pouls dans le cadre de la Contingent Emergency composante d'intervention IDA / 64670 Post Direct Selection Direct 10,525.00 0.00 Canceled 2020-06-05 2020-06-10 2020-07-15 2020-10-13 Response Component d'urgence (CERC) du projet COMPASS pour la lutte contre la propagation du COVID-19 KM-UGP SN-181684-GO-DIR / Acquisition de 50 000 Improve PHC infrastructure, masques au niveau local dans IDA / V2780 workforce and service Post Direct Selection Direct 33,800.00 35,811.75 Signed 2020-06-25 2020-06-23 2020-06-25 2020-06-24 2020-06-26 2020-06-26 2020-06-27 le cadre de la lutte contre le delivery platforms COVID KM-UGP SN-188745-GO-DIR / Fourniture, livraison et Contingent Emergency IDA / 64670 Post Direct Selection Direct 220,000.00 215,216.00 Signed 2020-08-25 2020-06-04 2020-08-30 2020-06-07 2020-10-04 2020-08-21 2021-04-02 installation de 104 lits Response Component médicals KM-UGP SN-189692-GO-DIR Pending Contingent Emergency / Fourniture des produits IDA / 64670 Post Direct Selection Direct 115,200.00 0.00 Implementati 2020-08-31 2020-09-05 2020-10-03 2020-11-02 Response Component médicaux on KM-UGP SN-193856-GO- Citizen Engagement and RFQ / Acquisition des Pending Empowerment, Project Request for Single Stage - One ordinateurs portables et fixes, IDA / D5050 Post Limited 40,000.00 0.00 Implementati 2020-09-26 2020-10-03 2020-10-10 Management, Monitoring and Quotations Envelope imprimantes, vidéo on Evaluation, projecteur, écran projecteur KM-UGP SN-197103-GO- RFQ / Fourniture et livraison Improve PHC infrastructure, Pending Request for Single Stage - One de 760 cartons de plumpy'Sup IDA / D5050 workforce and service Post Limited 40,000.00 0.00 Implementati 2020-10-12 2020-12-07 2021-01-21 Quotations Envelope pour la prise en charge des delivery platforms on cas de mal nutrition modérée. Strengthening institutions KM-UGP SN-200934-GO- and governance which are Pending RFQ / Acquisition d'un logiciel Request for Single Stage - One IDA / D5050 critical to (i) quality PHC and Post Limited 100,000.00 0.00 Implementati 2020-11-07 2020-12-26 2021-02-09 de suivi-évaluation pour Quotations Envelope (ii) response to disease on l'ANACEP outbreaks KM-UGP SN-200936-GO-RFB / Acquisition des Improve PHC infrastructure, Under équipements de gestion et Single Stage - One IDA / D5050 workforce and service Post Request for Bids Open - National 70,000.00 0.00 Implementati 2020-11-11 2021-02-08 2020-11-16 2020-12-28 2021-01-18 2021-02-08 2021-04-09 élimination des déchets bio Envelope delivery platforms on médicaux ainsi que les matériels de sécurité KM-UGP SN-201012-GO- RFQ / Acquisition des équipements relatifs à Improve PHC infrastructure, Pending Request for Single Stage - One l'intervention de bien être, IDA / D5050 workforce and service Post Limited 75,000.00 0.00 Implementati 2020-11-03 2020-12-29 2021-02-12 Quotations Envelope développement de la petite delivery platforms on enfance et autonomisation de la femme KM-UGP SN-210984-GO- RFQ / Acquisition en matériels informatiques (ordinateurs Citizen Engagement and Pending fixes et portables, Empowerment, Project Request for Single Stage - One IDA / D5050 Post Limited 25,000.00 0.00 Implementati 2020-12-24 2020-12-30 2020-12-31 imprimantes,...) pour les Management, Monitoring and Quotations Envelope on directions programmatiques, Evaluation, dans le cadre du projet COMPASS KM-UGP SN-211355-GO-DIR / Acquisition de 20 000 litres de chlore THT pour Pending désinfecter les sites Contingent Emergency IDA / 64670 Post Direct Selection Direct 12,000.00 0.00 Implementati 2020-12-22 2020-12-25 2020-12-30 2021-06-28 d'isolement, les points Response Component on d'entrée, les centres de santé publique et privée,..... dans le cadre du CERC KM-UGP SN-216481-GO-DIR / Acquisition dans l'urgence de 1500 bouteilles d'oxygène Under de 200 bars, équivalent à 11 Contingent Emergency IDA / 64670 Post Direct Selection Direct 171,000.00 0.00 Implementati 2021-01-29 2021-02-10 2021-02-03 2021-03-10 2021-09-06 250 m3 pour Response Component on réapprovisionner les sites d'isolements dans le cadre de la lutte contre la COVID-19 KM-UGP SN-218285-GO-UN / Acquisition de 30 000 test Pending Contingent Emergency UN Agencies rapides et 8000 tests IDA / 64670 Post Direct 390,000.00 0.00 Implementati 2021-02-11 2021-02-16 2021-03-05 2021-04-04 Response Component (Direct) GenXpert dans le cadre de la on lutte contre la COVID-19 KM-UGP SN-219117-GO-UN / Acquisition à travers la plateforme WAMBO (Fonds Pending Contingent Emergency UN Agencies Mondial) de 1 200 tests Xpert- IDA / 64670 Post Direct 30,000.00 0.00 Implementati 2021-02-11 2021-02-16 2021-03-09 2021-05-08 Response Component (Direct) Xpress SARS-COVID dans le on cadre de la lutte contre la COVID-19. Page 3 KM-UGP SN-219906-GO- RFQ / Acquisition des Pending pulvérisateurs pour la Contingent Emergency Request for Single Stage - One IDA / 64670 Post Limited 9,300.00 0.00 Implementati 2021-02-18 2021-02-23 2021-03-02 désinfection des surfaces, Response Component Quotations Envelope on dans le cadre de la lutte contre la COVID-19 KM-UGP SN-219911-GO- RFQ / Production des Pending supports de communications Contingent Emergency Request for Single Stage - One IDA / 64670 Post Limited 153,610.00 0.00 Implementati 2021-02-27 2021-03-28 2021-04-12 dans le cadre de la lutte Response Component Quotations Envelope on contre la COVID-19: dépliants, banderoles, affiches, panneaux,... KM-UGP SN-220778-GO- RFQ / Acquisition des Pending Contingent Emergency Request for Single Stage - One mégaphone dans le cadre de IDA / 64670 Post Limited 16,600.00 0.00 Implementati 2021-02-27 2021-03-06 2021-03-08 Response Component Quotations Envelope la communication pour la on lutte contre la COVID-19 KM-UGP SN-220781-GO- RFQ / Acquisition de gilets Pending Contingent Emergency Request for Single Stage - One dans le cadre de la IDA / 64670 Post Limited 16,600.00 0.00 Implementati 2021-02-27 2021-04-02 2021-05-02 Response Component Quotations Envelope communication pour la lutte on contre la COVID-19 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ACCORD Pending SERVICE/001/2020/COMPASS Contingent Emergency Request for Single Stage - One IDA / 64670 Post Limited 25,000.00 0.00 Implementati 2020-06-22 2020-08-17 2021-02-13 / Location 3 vehicule pour Response Component Quotations Envelope on DLM dans le cadre de CERC ACCORD SERVICE/002/2020/COMPASS Pending Contingent Emergency Request for Single Stage - One / Location 1 vehicule pour IDA / 64670 Post Limited 8,200.00 0.00 Implementati 2020-07-06 2020-08-31 2021-02-27 Response Component Quotations Envelope DRS Ndzuwani dans le cadre on de CERC ACCORD SERVICE/003/2020/COMPASS Pending Contingent Emergency Request for Single Stage - One / Location 1 vehicule pour IDA / 64670 Post Limited 8,200.00 0.00 Implementati 2020-07-06 2020-08-31 2021-02-27 Response Component Quotations Envelope DRS Ndzuwani dans le cadre on de CERC DCF-001/20/UGP/COMPASS / location avec maintenance groupes électrogènes pour CHN El-Marouf,et aux Pending fournitures de services de Contingent Emergency Request for Single Stage - One IDA / 64670 Post Limited 35,000.00 0.00 Implementati 2020-08-26 2020-10-28 2021-04-26 maintenances des groupes Response Component Quotations Envelope on électrogènes des HACC de BambaoMtsanga, CHRI de Samba-Nkuni, Fomboni et de Hombo et HP Mitsamiouli CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-UGP SN-126013-CS-LCS Citizen Engagement and / Recrutement d'un cabinet Empowerment, Project Least Cost Under IDA / V2780 Post Open - International 15,000.00 0.00 2019-08-29 2019-10-04 2019-09-12 2019-11-01 2019-10-17 2020-11-30 2019-11-14 2019-11-21 2019-12-10 2019-12-29 2020-02-12 pour l'audit financier du Management, Monitoring and Selection Implementation projet Evaluation, KM-UGP SN-126018-CS- QCBS / Conceptions Improve PHC infrastructure, Quality And Cost- architecturales et techniques IDA / V2780 workforce and service Post Open - National 90,000.00 0.00 Canceled 2019-08-23 2019-08-30 2019-09-24 2019-10-22 2019-10-29 2019-11-08 2019-11-29 2019-12-29 Based Selection et devis quantitatifs pour la delivery platforms rénovation des installations KM-UGP SN-175275-CS- QCBS / Recrutement d'un consultant pour des audits internes du projet COMPASS. Citizen Engagement and permet de donner au projet Empowerment, Project Quality And Cost- IDA / 64670 Post Open - International 25,000.00 33,944.93 Signed 2020-06-08 2020-06-07 2020-06-29 2020-06-16 2020-08-12 2020-09-29 2020-09-09 2020-10-13 2020-10-09 2020-10-19 2020-11-13 2020-10-22 2020-12-18 2021-01-19 2021-12-18 une assurance sur le degré de Management, Monitoring and Based Selection maîtrise de ses opérations, lui Evaluation, apporte ses conseils pour les améliorer, et contribue à créer de la valeur ajoutée INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-UGP SN-126009-CS- Citizen Engagement and INDV / Élaboration de la Individual Empowerment, Project stratégie de la formation IDA / V2780 Post Consultant Open 60,000.00 0.00 Canceled 2019-09-02 2019-08-30 2019-10-06 2019-10-22 2019-11-15 2019-12-30 Management, Monitoring and (clinique, management, Selection Evaluation, gestion de projet) KM-UGP SN-126015-CS- Citizen Engagement and Individual INDV / recrutement d'un Empowerment, Project IDA / V2780 Post Consultant Open 5,500.00 1,802.39 Signed 2019-08-19 2019-09-09 2019-09-23 2019-10-10 2019-10-07 2019-11-01 2019-10-31 2019-12-04 2019-12-30 spécialiste sauvegarde Management, Monitoring and Selection environnemental et social Evaluation, KM-UGP SN-126272-CS- Citizen Engagement and Individual INDV / Enquête de référence Empowerment, Project IDA / V2780 Post Consultant Open 120,000.00 0.00 Canceled 2019-08-26 2019-10-05 2019-10-19 2019-11-16 2019-12-26 et stratégie de Suivi et Management, Monitoring and Selection Evaluation Evaluation, Page 4 KM-UGP SN-127102-CS- QCBS / Préparation du Manuel Citizen Engagement and Individual d'Exécution du Projet et du Empowerment, Project IDA / V2780 Post Consultant Open 30,000.00 0.00 Canceled 2019-08-19 2019-10-15 2019-09-18 2019-09-23 2019-10-08 2019-11-07 Manuel de Procédures Management, Monitoring and Selection administratives, comptables Evaluation, et financières du projet. Citizen Engagement and KM-UGP SN-127132-CS- Individual Empowerment, Project INDV / recrutement d'un IDA / V2780 Post Consultant Open 3,000.00 723.30 Signed 2019-08-19 2019-10-15 2019-09-23 2019-11-21 2019-10-07 2019-12-24 2019-10-31 2020-01-06 2019-12-30 Management, Monitoring and assistant de direction Selection Evaluation, Citizen Engagement and KM-UGP SN-127194-CS- Individual Empowerment, Project INDV / Recrutement du IDA / V2780 Post Consultant Limited 11,500.00 0.00 Canceled 2019-08-29 2019-09-05 2019-09-03 2019-09-24 2019-10-29 2019-12-31 Management, Monitoring and personnel d'appui à l'UGP Selection Evaluation, KM-UGP SN-127206-CS- Citizen Engagement and INDV / recrutement de Individual Empowerment, Project Under consultants individuels pour IDA / V2780 Post Consultant Limited 95,000.00 0.00 2019-08-26 2021-05-26 2019-08-31 2019-09-21 2019-10-26 2019-12-10 Management, Monitoring and Implementation l'élaboration des manuels des Selection Evaluation, Normes et Standards KM-UGP SN-126010-CS- INDV / Analyse de la situation Improve PHC infrastructure, Individual dans les trois iles Pending IDA / V2780 workforce and service Post Consultant Open 40,000.00 0.00 2019-08-20 2019-09-24 2019-10-08 2019-11-01 2019-12-16 (infrastructures, équipements, Implementation delivery platforms Selection besoin en formation du personnel,...) KM-UGP SN-130558-CS- Citizen Engagement and INDV / Recrutement d'un Individual Empowerment, Project assistant fiduciaire qui se IDA / V2780 Post Consultant Open 3,300.00 3,006.50 Signed 2019-09-12 2019-10-08 2019-10-08 2020-03-06 2019-10-22 2020-03-09 2019-11-26 2020-03-23 2020-05-24 Management, Monitoring and chargerait entre autres de la Selection Evaluation, comptabilité. Citizen Engagement and Individual C003-COMPASS / Empowerment, Project IDA / V2780 Post Consultant Open 24,000.00 16,510.57 Signed 2018-09-07 2018-08-29 2018-10-17 2018-10-16 2018-11-07 2019-05-23 2019-05-24 2019-05-24 2019-12-31 Recrutement coordonnateur Management, Monitoring and Selection Evaluation, Citizen Engagement and C004-COMPASS / Individual Empowerment, Project Recrutement responsable de IDA / V2780 Post Consultant Open 14,000.00 1,778.10 Signed 2018-09-07 2018-08-29 2018-10-17 2018-10-16 2018-11-07 2019-07-25 2019-06-01 2019-06-01 2019-12-31 Management, Monitoring and passation des marchés Selection Evaluation, Citizen Engagement and C005-COMPASS / Individual Empowerment, Project Recrutement responsable IDA / V2780 Post Consultant Open 14,000.00 12,666.30 Signed 2018-09-07 2018-08-29 2018-10-17 2018-10-16 2018-11-07 2019-07-26 2019-06-01 2019-06-01 2019-12-31 Management, Monitoring and administratif et financier Selection Evaluation, Citizen Engagement and C006-COMPASS / Individual Empowerment, Project Recrutement responsable IDA / V2780 Post Consultant Open 14,000.00 10,533.60 Signed 2018-09-07 2018-08-29 2018-10-17 2018-10-16 2018-11-07 2019-07-26 2019-07-01 2019-07-26 2019-12-31 Management, Monitoring and suivi évaluation Selection Evaluation, KM-UGP SN-141269-CS- Citizen Engagement and Individual INDV / recrutement d'un Empowerment, Project IDA / V2780 Post Consultant Limited 15,000.00 0.00 Canceled 2019-10-18 2019-10-29 2019-10-20 2019-10-30 2019-11-23 2019-12-23 consultant pour élaborer le Management, Monitoring and Selection manuel d'exécution Evaluation, Citizen Engagement and KM-UGP SN-141276-CS- Individual Empowerment, Project INDV / Élaboration manuel de IDA / V2780 Post Consultant Limited 15,000.00 0.00 Canceled 2019-10-18 2019-10-23 2019-11-02 2019-11-26 2019-12-26 Management, Monitoring and procédure Selection Evaluation, KM-UGP SN-156469-CS- Citizen Engagement and INDV / recrutement d'un Individual Empowerment, Project chargé de communication IDA / V2780 Post Consultant Open 4,080.00 9,565.04 Signed 2020-02-13 2020-02-19 2020-04-02 2020-04-22 2020-04-23 2020-05-28 2020-05-28 2020-06-01 2020-11-24 Management, Monitoring and dans le cadre du projet Selection Evaluation, COMPASS KM-UGP SN-159416-CS- Citizen Engagement and Individual INDV / Recrutement des 3 Empowerment, Project Under IDA / V2780 Post Consultant Limited 7,896.00 6,016.40 2020-02-27 2020-02-24 2020-03-01 2020-03-13 2020-03-11 2020-05-28 2020-04-01 2020-06-30 chauffeurs pour les services Management, Monitoring and Implementation Selection de l'UGP de COMPASS Evaluation, KM-UGP SN-159421-CS- Citizen Engagement and INDV / Recrutement d'un Individual Empowerment, Project gardien pour assurer la IDA / V2780 Post Consultant Limited 2,875.00 3,259.00 Signed 2020-02-28 2020-04-07 2020-03-03 2020-04-20 2020-03-13 2020-06-12 2020-04-06 2020-06-19 2020-07-05 Management, Monitoring and sécurité du local du Projet Selection Evaluation, COMPASS KM-UGP SN-159428-CS- Citizen Engagement and INDV / Recrutement d'un Individual Empowerment, Project technicien de surface pour IDA / V2780 Post Consultant Limited 1,980.00 2,742.90 Signed 2020-02-26 2020-04-07 2020-03-01 2020-04-20 2020-03-11 2020-06-12 2020-04-01 2020-06-19 2020-06-30 Management, Monitoring and assurer l'entretien et l'hygiène Selection Evaluation, du local de COMPASS KM-UGP SN-126280-CS- Citizen Engagement and Individual INDV / Développement de la Empowerment, Project IDA / V2780 Post Consultant Open 40,000.00 0.00 Canceled 2019-08-26 2019-09-02 2019-10-05 2019-10-17 2019-11-14 2019-12-29 stratégie et du plan de Management, Monitoring and Selection communication Evaluation, KM-UGP SN-173705-CS- INDV / Recrutement d'un consultant individuel pour Strengthening institutions l'élaboration et mise à jour du and governance which are Individual Financement Basé sur la IDA / 64670 critical to (i) quality PHC and Post Consultant Open 40,000.00 33,538.60 Signed 2020-05-26 2020-06-11 2020-07-14 2020-11-25 2020-08-04 2021-01-27 2020-09-08 2021-02-18 2020-11-07 Performance (PBF) dans le (ii) response to disease Selection cadre du projet d'Approche outbreaks Globale de Renforcement du Système de Santé COMPASS KM-UGP SN-175327-CS- INDV / Recrutement d'un consultant en planification Individual Contingent Emergency Under opérationnelle pour appuyer IDA / 64670 Post Consultant Open 10,787.00 0.00 2020-06-08 2020-06-10 2020-07-18 2020-08-03 2020-08-24 2022-02-15 Response Component Implementation la Direction de Lutte contre la Selection Maladie (DLM) dans la mise en œuvre des activités de CERIP Page 5 KM-UGP SN-177269-CS- Citizen Engagement and Individual INDV / Recrutement d'un chef Empowerment, Project IDA / 64670 Post Consultant Open 8,160.00 3,985.92 Signed 2020-06-09 2020-06-07 2020-07-21 2020-08-14 2020-07-26 2020-10-05 2020-08-05 2020-10-05 2021-02-01 comptable dans le cadre du Management, Monitoring and Selection projet COMPASS Evaluation, KM-UGP SN-177270-CS- Citizen Engagement and INDV / Recrutement d'un Individual Empowerment, Project assistant de passation des IDA / 64670 Post Consultant Open 5,760.00 2,184.98 Signed 2020-06-09 2020-06-07 2020-07-12 2020-09-03 2020-07-26 2020-10-23 2020-08-05 2020-10-23 2021-02-01 Management, Monitoring and marchés pour appuyer l'Unité Selection Evaluation, de Gestion du Projet COMPASS KM-UGP SN-177290-CS- INDV / Recrutement d'un(e) secrétaire pour assister la Direction de la Lutte contre la Individual Maladie (DLM) dans le cadre Contingent Emergency Under IDA / 64670 Post Consultant Open 5,663.00 0.00 2020-06-08 2020-06-11 2020-07-18 2020-08-01 2020-08-22 2021-08-22 de la Composante Response Component Implementation Selection d'intervention d'Urgence (CERC) du projet COMPASS pour la lutte contre le COVID- 19 aux Comores KM-UGP SN-168387-NC-DIR / Contrat avec le croissant rouge pour le renforcement Citizen Engagement and des capacités des prestataires Empowerment, Project IDA / V2780 Post Direct Selection Direct 15,000.00 14,880.36 Signed 2020-04-13 2020-04-13 2020-04-14 2020-04-17 2020-04-14 2020-04-17 2020-04-19 de soins des 3 iles par une Management, Monitoring and formation axée sur l'habillage, Evaluation, la prise en charge mortuaire et la désinfection KM-UGP SN-177871-CS- Citizen Engagement and INDV / Acquisition d'un Individual Empowerment, Project responsable insulaire pour IDA / 64670 Post Consultant Open 10,800.00 12,129.71 Signed 2020-06-09 2020-06-10 2020-07-21 2020-08-27 2020-07-26 2020-10-30 2020-08-05 2020-11-09 2021-02-01 Management, Monitoring and assurer les activités du projet Selection Evaluation, dans l'ile de Ngazidja KM-UGP SN-177877-CS- INDV / Recrutement d'un Citizen Engagement and Individual responsable insulaire pour Empowerment, Project IDA / 64670 Post Consultant Open 10,800.00 1,997.95 Signed 2020-06-09 2020-06-10 2020-07-21 2020-08-29 2020-07-26 2020-10-30 2020-08-05 2020-11-09 2021-02-01 assurer les activités de Management, Monitoring and Selection COMPASS dans l'ile de Evaluation, Ndzuwani KM-UGP SN-177879-CS- Citizen Engagement and INDV / Recrutement d'un Individual Empowerment, Project responsable insulaire pour IDA / 64670 Post Consultant Open 10,800.00 11,955.19 Signed 2020-06-09 2020-06-10 2020-07-21 2020-08-29 2020-07-26 2020-10-30 2020-08-05 2020-11-09 2021-02-01 Management, Monitoring and assurer les activités de Selection Evaluation, COMPASS dans l'ile de Mwali KM-UGP SN-177926-CS- INDV / Recrutement d'un Citizen Engagement and chargé administratif et Individual Empowerment, Project Under financier insulaire pour IDA / 64670 Post Consultant Open 6,900.00 0.00 2020-06-09 2020-06-10 2020-07-07 2020-07-12 2020-08-05 2021-02-01 Management, Monitoring and Implementation assurer les activités Selection Evaluation, administratives et financière de l'ile de Ndzuwani KM-UGP SN-177931-CS- INDV / Recrutement d'un Citizen Engagement and chargé administratif et Individual Empowerment, Project financier qui va assurer la IDA / 64670 Post Consultant Open 6,900.00 792.82 Signed 2020-06-09 2020-06-10 2020-07-21 2020-08-27 2020-07-27 2020-10-30 2020-08-08 2020-11-09 2021-02-04 Management, Monitoring and responsabilité administrative Selection Evaluation, et financière de l'ile de Ngazidja KM-UGP SN-177935-CS- INDV / recrutement d'un Citizen Engagement and chargé administratif et Individual Empowerment, Project Under financier insulaire pour IDA / 64670 Post Consultant Open 6,900.00 0.00 2020-06-09 2020-06-10 2020-07-21 2020-07-27 2020-08-10 2021-02-06 Management, Monitoring and Implementation assurer les responsabilités Selection Evaluation, administratifs et financiers de Mwali KM-UGP SN-196779-CS- INDV / Étude sur les besoins énergétiques et Diagnostic Individual Contingent Emergency Under des groupes électrogènes IDA / 64670 Post Consultant Limited 20,000.00 0.00 2020-10-12 2020-11-02 2020-10-17 2020-11-16 2020-11-25 2021-01-09 Response Component Implementation pour les établissements de Selection soins de santé de l’Union des Comores KM-UGP SN-200658-CS-CDS Citizen Engagement and / Formation de PPSD à l'Unité Empowerment, Project Under IDA / D5050 Post Direct Selection Direct 20,000.00 0.00 2020-10-22 2020-10-26 2020-10-29 2020-11-02 2020-11-05 de Gestion de Projet et une Management, Monitoring and Implementation mise à jour dudit PPSD Evaluation, KM-UGP SN-200672-CS- Strengthening institutions INDV / Recrutement d'un and governance which are Individual consultant pour l'élaboration Under IDA / D5050 critical to (i) quality PHC and Post Consultant Open 20,000.00 0.00 2020-10-27 2020-11-03 2020-11-30 2020-12-14 2020-12-23 2021-02-01 de curricula de formation des Implementation (ii) response to disease Selection techniciens de laboratoires outbreaks d'analyses médicales KM-UGP SN-200932-CS- INDV / recrutement d'un consultant pour l'évaluation Improve PHC infrastructure, Individual Under des curriculums des IDA / D5050 workforce and service Post Consultant Open 20,000.00 0.00 2020-10-27 2020-11-03 2020-11-30 2020-12-07 2020-12-28 2021-02-06 Implementation formations en soins infirmiers delivery platforms Selection et soins des obstétricaux des étudiants de l'EMSP. KM-UGP SN-201023-CS- INDV / Recrutement d'un Strengthening institutions consultant pour l'élaboration and governance which are Individual de toute réglementation IDA / D5050 critical to (i) quality PHC and Post Consultant Open 20,000.00 0.00 Canceled 2020-10-29 2020-12-02 2020-12-02 2020-12-23 2021-01-06 2021-02-05 devant régir le (ii) response to disease Selection fonctionnement du Système outbreaks d'Information Sanitaire (SIS) KM-UGP SN-209275-CS- INDV / Recrutement d'un Strengthening institutions consultant pour l'élaboration and governance which are Individual Pending de toute réglementation IDA / D5050 critical to (i) quality PHC and Post Consultant Limited 20,000.00 0.00 2020-12-12 2020-12-17 2020-12-24 2021-01-07 2021-02-21 Implementation devant régir le (ii) response to disease Selection fonctionnement du Système outbreaks d'Information Sanitaire (SIS) Page 6 KM-UGP SN-210979-CS- Citizen Engagement and INDV / Recrutement d'un Individual Empowerment, Project Pending chauffeur pour l'unité IDA / D5050 Post Consultant Limited 3,948.00 0.00 2020-12-22 2020-12-27 2021-01-10 2021-01-31 2021-07-30 Management, Monitoring and Implementation insulaire de Ngazidja dans le Selection Evaluation, cadre du COMPASS KM-UGP SN-210980-CS- Citizen Engagement and INDV / Recrutement d'un Individual Empowerment, Project Pending chauffeur de l'unité insulaire IDA / D5050 Post Consultant Limited 3,948.00 0.00 2020-12-22 2020-12-27 2021-01-10 2021-01-31 2021-07-30 Management, Monitoring and Implementation de Ndzuwani dans le cadre du Selection Evaluation, COMPASS KM-UGP SN-210981-CS- Citizen Engagement and INDV / Recrutement d'un Individual Empowerment, Project Pending chauffeur pour l'unité IDA / D5050 Post Consultant Limited 3,948.00 0.00 2020-12-22 2020-12-27 2021-01-10 2021-01-31 2021-07-30 Management, Monitoring and Implementation insulaire du projet COMPASS à Selection Evaluation, Mwali KM-UGP SN-210982-CS- INDV / Recrutement d'un Citizen Engagement and Individual chauffeur dans le cadre du Empowerment, Project Pending IDA / D5050 Post Consultant Limited 3,948.00 0.00 2020-12-22 2020-12-27 2021-01-10 2021-01-31 2021-07-30 COMPASS pour le véhicule Management, Monitoring and Implementation Selection affecté à la DGS dans le cadre Evaluation, des activités du COMPASS KM-UGP SN-210983-CS- INDV / Recrutement d'un chef Citizen Engagement and comptable dans le cadre du Individual Empowerment, Project Under projet COMPASS en IDA / D5050 Post Consultant Open 9,000.00 0.00 2020-12-22 2021-01-05 2021-01-21 2021-02-04 2021-03-04 2021-08-31 Management, Monitoring and Implementation remplacement du chef Selection Evaluation, comptable démissionnaire de ses fonctions KM-UGP SN-210985-CS- Individual INDV / Recrutement d'une Contingent Emergency Pending IDA / 64670 Post Consultant Limited 2,600.00 0.00 2020-12-28 2021-01-02 2021-01-09 2021-01-30 2021-04-30 technicienne de surface dans Response Component Implementation Selection le cadre du CERC KM-UGP SN-229454-CS- INDV / Recrutement d'un Strengthening institutions Assistant Technique and governance which are Individual (inspecteur pharmacien) pour IDA / D5050 critical to (i) quality PHC and Post Consultant Open 62,700.00 0.00 Under Review 2021-04-29 2021-05-18 2021-06-17 2021-07-08 2021-08-12 2022-02-08 la mise en place du système (ii) response to disease Selection d'assurance qualité des outbreaks médicaments au sein de l'ANAMEV KM-UGP SN-233154-CS- INDV / Recrutement de deux Strengthening institutions statisticiens pour réaliser and governance which are Individual l'enquête base line de l'étude IDA / D5050 critical to (i) quality PHC and Post Consultant Limited 14,000.00 0.00 Under Review 2021-05-12 2021-05-30 2021-05-17 2021-06-07 2021-06-28 2021-09-26 d'impact des mesures (ii) response to disease Selection d'accompagnement, dans le outbreaks cadre du projet COMPASS KM-UGP SN-233204-CS- INDV / Recrutement d’un Strengthening institutions consultant informaticien pour and governance which are Individual la collecte numérique des IDA / D5050 critical to (i) quality PHC and Post Consultant Limited 6,000.00 0.00 Under Review 2021-05-12 2021-05-07 2021-05-17 2021-06-07 2021-06-28 2021-09-26 données pour évaluation (ii) response to disease Selection d’impact, dans le cadre du outbreaks projet COMPASS. KM-UGP SN-233282-CS-CDS / Recrutement d'une firme Strengthening institutions pour les études and governance which are Under environnementales et sociales IDA / D5050 critical to (i) quality PHC and Post Direct Selection Direct 25,000.00 0.00 2021-05-11 2021-05-08 2021-05-21 2021-06-18 2021-09-16 Implementation requises pour le projet de (ii) response to disease vaccination contre la COVID- outbreaks 19 KM-UGP SN-234954-CS- INDV / Recrutement d'un Strengthening institutions consultant national pour and governance which are Individual Under appuyer la DLM à l'élaboration IDA / D5050 critical to (i) quality PHC and Post Consultant Open 10,000.00 0.00 2021-05-21 2021-06-09 2021-06-23 2021-07-07 2021-08-04 2021-09-03 Implementation d'un plan d'action national sur (ii) response to disease Selection la résistance aux outbreaks antimicrobiens. KM-UGP SN-234969-CS- INDV / recrutement d'un Improve PHC infrastructure, Individual consultant pour développer Under IDA / D5050 workforce and service Post Consultant Open 40,000.00 0.00 2021-05-18 2021-06-09 2021-07-06 2021-07-13 2021-08-03 2021-09-02 un plan de communication Implementation delivery platforms Selection ANJE, surpoids et espace de bien être de la petite enfance KM-UGP SN-235849-CS-CDS Strengthening institutions / recrutement d'un consultant and governance which are Under pour appuyer le COMPASS IDA / D5050 critical to (i) quality PHC and Post Direct Selection Direct 10,000.00 0.00 2021-05-25 2021-06-15 2021-05-27 2021-05-28 2021-06-04 Implementation dans l'élaboration du PPSD du (ii) response to disease projet de vaccinantion outbreaks KM-UGP SN-239024-CS- Strengthening institutions INDV / Recrutement d'un and governance which are Individual Coordonnateur Technique Pending IDA / D5050 critical to (i) quality PHC and Post Consultant Open 13,000.00 0.00 2021-06-10 2021-07-29 2021-08-03 2021-08-22 2022-02-18 pour le Financement Basé sur Implementation (ii) response to disease Selection la Performance (CT FBP), dans outbreaks le cadre du projet COMPASS KM-UGP SN-239031-CS- INDV / Recrutement d'un Strengthening institutions Responsable Suivi-Evaluation and governance which are Individual Pending (administrateur du portail) au IDA / D5050 critical to (i) quality PHC and Post Consultant Open 10,000.00 0.00 2021-06-10 2021-07-29 2021-08-03 2021-08-22 2022-02-18 Implementation sein de la cellule technique (ii) response to disease Selection Financement Basé sur la outbreaks Performance "FBP" Page 7 MINISTRY OF HEALTH Transforming Health Systems for Universal Care Project Project Procurement Plan Financial Year 2016/2017 IDA CREDIT No. 5836-KE GFF Grant Agreement TF0A2561 PHRD Grant Agreement TF0A2792 General 1. Project information: The Government of Kenya has applied for a Credit from the International Development Association supporting the Transforming Health Systems or Universal Care Project 2. Bank’s approval Date of the procurement Plan [Original::] 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 1st June, 2016 to 31st December, 2017 II. Goods and Works and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Method Threshold Prior Review Threshold 1 ICB – Works ≥US$15 million ≥US$10 million 2 NCB- Works 3,000,000 4. AON (Travaux) Néant 5. (Services Non-consultant) Néant [Ajouter d’autres méthodes si nécessaire] 2. Pré-qualification Les soumissionnaires pour _____________ seront pré- qualifiés selon les dispositions du Règlement 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 3.17 des Directives : [se référer au document approprié d'exécution de projet de CDD approuvé par la Banque] NA 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : manuel en cours de preparation 5. Tout autre arrangement spécial en passation de marchés : [y compris Passation de marchés anticipée et financement rétroactif, si applicable] 6. Allotissement de fournitures avec méthodes et calendrier : [Enumérer d’abord les allotissements qui nécessitent la revue préalable de la Banque, ensuite les autres allotissements] 1 2 3 4 5 6 7 8 9 Description Contrat Coût Méthod Pré- Préféren Revue de Date Commentair estimatif e de qualificati ce la prévue es Réf sélecti on national Banque d’ouverture . on Oui / Non e (à priori / des No Oui / à soumission Non posteriori s ) Achat de deux A Novembre F00 véhicules 70,000 DC Non Non postério 2019 UNOPS 1 ri F00 Achat de matériel A Novembre 40,000 DC Non Non 2 informatiques, et postério 2019 bureautiques et ri logiciels Achat de mobilier A Novembre F00 de bureau 20,000 DC Non Non postério 2019 3 ri Frais de fonctionnement de l’UGP : Location de bureau entretien, Internet, annonces A F00 et publications, 20,000 DC Non Non posterio N/A Multiple 4 médias, frais ri bancaires, consommables, ateliers, communication. TOTAL 150000 III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans l'Annexe 1 des Directives Sélection et Emploi de consultants : Méthode de sélection Seuil de revue à Commentaires priori 1. Méthode compétitive (firmes) >500,000 2. Entente directe (firmes) >500,000 3. Consultants Individuels >200,000 4. Entente directe CI >200,000 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de $_______ par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 2.7 des directives de sélection de consultants. 3. Tout autre arrangement spécial de Sélection de consultants : [y compris passation de marchés anticipée et financement rétroactif, si applicable] 4. Tâches de consultation avec des méthodes de sélection et calendrier 1 2 3 4 5 6 7 Date prévue Revue de la Coût Méthode de Réf. Banque (à Commentair Description des missions estimatif de soumission No. priori / à es (en $) sélection des posteriori) propositions 1. Missions de préparation de projet Etudes de sauvegarde fevrier 2019 45j pour C001 environnementale et sociale 50,000 SFQC Non finaliser (CPR, CGES, PGIP) Préparation du PPSD (plan et Avril 2019 stratégie de passation du C002 marchés) et Plan de 6,000 SED Non Atelier+AT passation des marchés (18 premiers mois) Préparation du manuel des Non octobre201 opérations du projet et 9 C003 20,000 SCI manuel des procédures administratives et financières Mission d’AT/Echange SUD Non novembre SUD pour le recrutement et 2019 C004 50,000 SCI la structuration de l’UGP et la préparation du projet Etudes de base sur les decembre2 bénéficiaires du projet et 019 C005 100,000 SFQC Non définition du cadre des résultats Etudes et enquêtes de Non Décembre2 C006 100,000 SCI 019 conception de projet SOUS-TOTAL 1 326,000 2. Mise en place de l’Unité de Gestion du Projet C011 Coordonnateur SCI Non Octobre 25,000 2019 Spécialiste en passation de SCI Non octobre C012 15,000 2019 marchés Spécialiste Gestion SCI Non octobre C013 15,000 2019 Financière C014 Comptable 10,000 SCI Non octobre201 9 C015 Auditeur Externe 20,000 SCI Non dceembre 2019 C016 Auditeur Interne 15,000 SCI Non deecmbre 2019 C017 Personnel Administratif. 10,000 SCI Non octobre 2019 C018 Spécialiste environnemental 15,000 SCI Non octobre201 9 C019 Spécialiste social 15,000 SCI Non octobre 2019 Spécialiste en Suivi 15,000 SCI Non Novembre C020 2019 Evaluation Expert en Chaines de 20,000 SCI Non Novembre C021 2019 Valeurs Expert en Climat des Affaires 20,000 SCI Non Novembre C022 et Développement du 2019 Secteur Privé Expert en Développement 20,000 Non Novembre C023 SCI 2019 Rural et Transport SOUS-TOTAL 2 215,000 541000 3. Préparation a la mise en œuvre Elaboration des TDRS, lancement du processus de Novembre C031 passation des marchés pour 50,000 SCI Non 2019 les activités techniques et les voyages d’études Stratégie de communication et activités de novmbre C032 50,000 SCI Non communication sur le 2019 terrain ; lancement du projet Schémas directeurs et diagnostiques pour le Decembre C033 100,000 SCI Non financement des 2019 infrastructures clé du projet Enquête et analyse des coûts C034 pour les investissements des 100,000 SCI Non janvier 2020 transport/routiers prioritaires Enquête et analyse des coûts pour les investissement en C035 100,000 SCI Non janvier 2020 infrastructures agricoles/d’élévage Enquête et analyse des coûts pour les investissement en C036 100,000 SCI Non fevrier2020 infrastructures commerciales / logistiques Enquête et analyse des coûts C037 pour les investissement en 100,000 SCI Non fevrier 2020 infrastructures touristiques Evaluation des capacités des institutions ciblées (telles que la CGA, l’ANPI, l’UCCIA, C038 MECK Moroni, AMIE etc.) pour 50,000 SFQC Non Mars 2020 650 déterminer un potentiel partenariat pour la mise en œuvre d’activités du PIDC Plan stratégique sur les reformes prioritaires du C039 50,000 SCI Non mars 2020 cadre des affaires dans les secteurs ciblés par le projet. Consultation et mission C040 d’approche pour la promotion 50,000 SCI Non fvrier 2020 des investissements C041 Conception détaillé de l’appui 100,000 SCI mars 2020 aux chaînes de valeur cibles Conception détaillé du mécanisme d’appui directe aux PME et entrepreneurs et de renforcement de l’écosystème decembre C042 100,000 SCI Non d’appui et préparation du 2019 Manuel de procédures pour le mécanisme d’appui directe aux PME et Entrepreneurs AT et consultation pour la decembre C043 50,000 SCI Non description des mission 2019 Etude Mobilisation de la Diaspora pour s l’investissement productif 0 C044 Recrutement de cabinet en charge de la mise en œuvre du mécanisme d’appui directe aux novembre C045 600,000 SFQC Oui PME et Entrepreneurs en 2019 partenariat avec les institutions requises (IMF-ONG etc..) Etudes APS et APD pour novembre Total C046 r0utes et infrastructures 200,000 2019 500,000$ rurales Voyages d’études et janvier C046 50.000 NA Non formation pour l’UGP 2020 SOUS-TOTAL 3 1,850.00 0 2,391.00 TOTAL CONSULTANCE 0 IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier 1. Dans cette section, les activités de renforcement de capacité acceptées (quelques articles pourraient être des recommandations de CPAR) sont énumérées avec le calendrier No. Résultats Coût Durée Date de Commentaires escomptés / estimatif estimative début Description de l’activité PROCUREMENT Comoros : Integrated Development and Competitiveness Project PLAN General Information Country: Comoros Bank’s Approval Date of the Original Procurement Plan: 2019-04-10 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164584 GPN Date: Project Name: Integrated Development and Competitiveness Project Loan / Credit No: IDA / 64230, IDA / V2650 UNITE DE GESTION DU PROJET INTEGRE DE DEVELOPPEMENT ET DE LA COMPETITITVITE Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National KM-PIDC-236028-CW-RFQ / Procurement Pending Recrutement d'une entreprise Value-chain development in Request for Single Stage - One 2021-08- IDA / 64230 Post Limited Document - 1 38,000.00 0.00 Implementat 2021-06-02 2021-07-06 pour la réhabilitation du local priority sectors Quotations Envelope 20 Envelope process ion de l'UGP du PIDC (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-PIDC-142962-NC-RFP / Achat de matériel Project implementation and Request for Single Stage - Two IDA / V2650 Post Limited 40,000.00 31,271.52 Completed 2019-10-30 2020-01-08 2020-01-15 2020-05-31 2020-01-15 2020-05-31 2020-03-25 2020-05-31 2020-07-12 2020-03-06 2022-01-03 2021-03-15 informatiques, et coordination Proposals Envelope bureautiques et logiciels KM-PIDC-142968-GO-RFP / Project implementation and Request for Single Stage - Two IDA / V2650 Post Limited 20,000.00 16,134.66 Completed 2019-10-30 2020-01-08 2020-01-15 2020-05-27 2020-01-15 2020-05-27 2020-03-25 2020-05-27 2020-07-12 2020-05-27 2022-01-03 2020-09-03 Achat de mobilier de bureau coordination Proposals Envelope KM-PIDC-164295-GO-DIR / ACQUISITION ET Value-chain development in INSTALLATION DU LOGICIEL IDA / V2650 Post Direct Selection Direct 30,000.00 56,120.81 Completed 2020-04-10 2020-03-24 2020-04-15 2020-03-28 2020-05-14 2020-06-16 2021-05-14 2021-02-22 priority sectors TOM2PRO VERSION MULTIPROJET KM-PIDC-216946-GO-RFB / Acquistion d'un véhicule frigorifique pour appuyer le centre laitier de Mrémani en Value-chain development in Single Stage - One matière de de IDA / 64230 Post Request for Bids Open - National 35,000.00 0.00 Canceled 2021-02-08 2021-02-09 2021-02-10 2021-02-25 2021-02-23 2021-03-04 2021-02-24 2021-03-14 2021-05-13 priority sectors Envelope conditionnement, de conservation et du transport des leur produit laitier vers les zones de commercialisation KM-PIDC-216951-GO-RFB / Fournitures des boites des Value-chain development in Single Stage - One conservations et emballages IDA / 64230 Post Request for Bids Open - National 35,000.00 0.00 Canceled 2021-02-08 2021-02-09 2021-02-09 2021-02-24 2021-02-23 2021-03-03 2021-02-24 2021-03-13 2021-05-12 priority sectors Envelope plastiques pour le centre laitier de Mrémani KM-PIDC-225105-GO-DIR / Aquisition et livraison des emballages plastiques ( 50 Value-chain development in 000 bouteilles et 50 000 pots IDA / 64230 Post Direct Selection Direct 34,412.00 32,635.03 Signed 2021-03-21 2021-03-20 2021-03-26 2021-03-20 2021-04-20 2021-04-13 2021-06-19 priority sectors de Yaourts à boire ) au bénéfice du centre Laitier de Mrémani KM-PIDC-228871-GO-RFB / Renforcement de capacité de Value-chain development in Single Stage - One l'UCCIA (acquistion des IDA / 64230 Post Request for Bids Open - National 50,000.00 35,368.79 Signed 2021-04-19 2021-04-29 2021-04-23 2021-04-30 2021-05-08 2021-05-20 2021-05-23 2021-06-09 2021-06-04 2021-06-17 2021-07-19 priority sectors Envelope matériels informatiques, et logistiques) KM-PIDC-230572-GO-DIR / Acquisition et livrasion d'un Value-chain development in véhicule frigorifique qui IDA / 64230 Post Direct Selection Direct 35,000.00 39,097.80 Signed 2021-04-27 2021-05-05 2021-05-03 2021-05-06 2021-05-21 2021-05-21 2021-07-20 priority sectors servira aux activités du centre Laitier de Mrémani en Anjouan NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-PIDC-142957-NC-RFP / Project implementation and Request for Single Stage - Two achat de deux véhicule de IDA / V2650 Post Limited 70,000.00 71,904.00 Completed 2019-11-04 2020-01-08 2020-01-20 2020-04-03 2020-01-20 2020-04-03 2020-03-30 2020-04-03 2020-07-17 2020-04-14 2022-01-08 2020-12-01 coordination Proposals Envelope tout terrain CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-PIDC-001 / étude de sauvegarde environnementale et sociale : cadre de gestion environnementale et Project implementation and Least Cost sociale(CGES). cadre de IDA / 64230 Post Open - International 50,000.00 53,316.13 Completed 2019-02-06 2018-02-06 2019-02-08 2019-03-02 2020-02-25 2019-03-30 2020-02-28 2019-04-29 2020-02-28 2019-05-20 2020-03-03 2019-06-24 2019-02-19 2019-08-13 2019-10-07 coordination Selection politique de réinstallation(CPR).plan de gestion des parasites et des pesticides(PIGP) Page 1 KM-PIDC-140311-CS-QCBS / Recrutement de cabinet en charge de la mise en œuvre du mécanisme d’appui directe Quality And Cost- IDA / V2650 Direct support to firms Post Open - International 600,000.00 594,667.57 Signed 2019-10-21 2020-02-12 2019-11-11 2020-03-19 2019-12-25 2020-05-20 2020-01-22 2020-08-15 2020-02-21 2020-08-15 2020-03-27 2020-12-17 2020-05-01 2021-01-25 2021-05-01 aux PME et Entrepreneurs en Based Selection partenariat avec les institutions requises (IMF- ONG etc..) KM-PIDC-167212-CS-LCS- AUDIT / Audit financier et Project implementation and Least Cost organisationnel du projet IDA / V2650 Post Open - International 90,000.00 31,165.01 Signed 2020-04-17 2020-04-09 2020-05-02 2020-04-28 2020-05-16 2020-07-11 2020-06-15 2020-09-03 2020-06-22 2020-09-25 2020-07-27 2020-10-12 2020-08-17 2020-10-15 2022-08-16 coordination Selection PIDCI les exercices 2019 2020 et 2021 KM-PIDC-190079-CS-INDV / Recrutement d’un Cabinet Consultant pour la réalisation d’une IDA / 64230 Direct support to firms Post Qualification Limited 30,000.00 0.00 Canceled 2020-09-04 2020-09-01 2020-09-19 2020-09-26 2020-10-06 2020-11-05 étude d’impact du COVID-19 Selection sur le secteur privé et stratégie d’atténuation aux Comores. KM-PIDC-191911-CS-CQS / Recrutement d'un cabinet Consultant Value-chain development in pour la réalisation d'une étude IDA / 64230 Post Qualification Limited 30,000.00 32,298.03 Completed 2020-09-09 2020-09-05 2020-09-19 2020-09-16 2020-09-26 2020-10-28 2020-09-29 2020-10-28 2020-11-05 2021-02-05 priority sectors sur l’impact du covid 19 dans Selection les entreprises KM-PIDC-210204-CS-CQS / Recrutement d'un cabinet Consultant Value-chain development in National pour la mise en place IDA / 64230 Post Qualification Limited 50,000.00 50,315.58 Signed 2020-12-19 2020-12-17 2021-01-04 2020-12-29 2021-01-13 2021-02-17 2021-01-20 2021-02-18 2021-05-20 priority sectors d'une base des données Selection nationale agricoles KM-PIDC-225186-CS-LCS / Recrutement d'un cabinet pour l' élaboration des études Value-chain development in Least Cost Under de faisabilités techniques, IDA / 64230 Post Open - National 30,000.00 0.00 2021-03-20 2021-03-31 2021-03-23 2021-04-13 2021-04-12 2021-04-27 2021-05-04 2021-05-16 2021-05-28 2022-02-28 priority sectors Selection Implementation contrôle et surveillance pour la réhabilitation des CRDE du PIDC KM-PIDC-232340-CS-CQS / Recrutement d'un cabinet pour la réalisation des APD des 32,8 km , APS et APD des Consultant Value-chain development in Under 19km des pistes identifié), IDA / 64230 Post Qualification Limited 410,000.00 0.00 2021-05-06 2021-05-04 2021-05-21 2021-05-11 2021-05-31 2021-06-19 2022-03-16 priority sectors Implementation assistance en passation des Selection marchés de 51,8 km et contrôle et surveillance de toutes les pistes rurales INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-PIDC-129548-CS-LCS / recrutement d'un consultant pour l'élaboration d'un Individual Project implementation and manuel de procédure des IDA / V2650 Post Consultant Open 20,000.00 6,575.43 Completed 2019-09-18 2019-08-27 2019-10-08 2020-03-19 2019-10-15 2020-03-19 2019-10-31 2020-03-05 2019-11-30 2020-06-19 coordination opérations du projet et Selection manuel des procédures administratives et financières KM-PIDC-133798-CS-INDV / Individual terme de reference pour le Project implementation and IDA / V2650 Post Consultant Open 15,000.00 27,481.96 Signed 2019-09-17 2019-10-26 2019-10-16 2020-03-16 2019-10-22 2020-03-16 2019-11-19 2020-03-17 2020-02-19 recrutement d'un spécialiste coordination Selection en sauvegarde sociale KM-PIDC-140312-CS-INDV / Individual Project implementation and recrutement d'un spécialiste IDA / V2650 Post Consultant Open 15,000.00 27,481.96 Signed 2019-10-21 2019-10-26 2019-12-09 2020-03-16 2019-12-30 2020-03-16 2020-02-03 2020-03-17 2020-08-01 coordination environnementales Selection KM-PIDC-140313-CS-CDS / Etudes APS et APD pour les Project implementation and IDA / V2650 Prior Direct Selection Direct 500,000.00 177,464.20 Completed 2019-10-21 2020-01-29 2019-10-31 2020-02-18 2020-01-04 2020-10-13 2020-07-02 2021-04-30 routes et infrastructures coordination rurales KM-PIDC-140315-CS-INDV / Individual Project implementation and poste de comptable pour IDA / V2650 Post Consultant Open 10,000.00 1,989.86 Signed 2019-10-21 2020-01-14 2019-12-09 2020-05-02 2019-12-30 2020-05-04 2020-02-03 2020-05-06 2020-08-01 coordination l'unité de gestion de projet Selection KM-PIDC-142971-CS-CQS / Etudes APS et APD pour IDA / V2650 Direct support to firms Prior Direct Selection Direct 500,000.00 0.00 Canceled 2019-11-11 2019-11-21 2020-01-25 2020-07-23 r0utes et infrastructures rurales Individual KM-PIDC-147637-CS-INDV / Project implementation and IDA / V2650 Prior Consultant Open 25,000.00 0.00 Canceled 2019-04-16 2020-01-22 2019-07-08 2020-03-17 2019-08-17 2020-03-23 2019-10-01 2019-12-30 recrutement du coordinateur coordination Selection KM-PIDC-148785-CS-INDV / Individual Project implementation and recrutement d'un spécialiste IDA / V2650 Prior Consultant Open 15,000.00 0.00 Canceled 2019-04-16 2020-01-22 2019-07-08 2020-03-17 2019-08-17 2020-03-25 2019-10-01 2019-11-10 coordination en gestion financière Selection KM-PIDC-148786-CS-INDV / Individual Project implementation and recrutement specialiste en IDA / V2650 Prior Consultant Open 15,000.00 0.00 Canceled 2019-04-16 2019-07-08 2019-08-17 2019-10-01 2019-12-30 coordination passation du marché Selection KM-PIDC-154122-CS- INDVRPM / Recrutement du Responsable de Passation des Marchés pour la programmation des marchés Individual Value-chain development in du projet, de préparer les IDA / V2650 Post Consultant Limited 15,000.00 3,047.87 Signed 2020-01-25 2020-01-21 2020-02-19 2020-03-28 2020-03-03 2020-04-22 2020-03-17 2020-05-06 2020-03-19 priority sectors dossiers d’appel d’offres, de Selection superviser les actions d’exécution des marchés et d’établir les rapports des passation de marché. Page 2 KM-PIDC-154815-CS-INDV SV / Recrutement du responsable de suivi et évaluation afin d'assurer Individual entre autre le dispositif de Value-chain development in IDA / V2650 Post Consultant Open 15,000.00 19,219.70 Signed 2020-01-31 2020-01-24 2020-03-05 2020-04-23 2020-03-15 2020-06-12 2020-04-08 2020-06-14 2020-04-13 suivi et évaluation du projet priority sectors Selection ,d’élaborer le manuel de suivi- évaluation, d'’élaborer les outils de suivi-évaluation ect.... KM-PIDC-156157-CS-INDV ATPM / Consultant pour assistance technique en passation de marché Individual Value-chain development in temporaire au projet PIDC IDA / V2650 Post Consultant Direct 2,800.00 2,678.71 Completed 2020-02-05 2020-01-31 2020-02-16 2020-05-02 2020-02-17 2020-05-02 2020-03-01 2020-03-05 2020-05-31 2020-11-30 priority sectors pendant la période de Selection recrutement et d’intégration du Responsable de passation de marché KM-PIDC-166653-CS-INDV / Conception du mécanisme d’appui directe aux entreprises et de Individual Value-chain development in renforcement de l’écosystème IDA / V2650 Post Consultant Open 30,000.00 44,280.50 Completed 2020-04-15 2020-04-01 2020-05-12 2020-06-29 2020-05-27 2020-08-22 2020-06-03 2020-08-29 2020-07-03 2021-02-02 priority sectors d'appui et préparation du Selection Manuel de procédures pour le mécanisme d’appui directe aux entreprises KM-PIDC-169557-CS-INDV / Individual Recrutement d'un expert en Value-chain development in IDA / 64230 Post Consultant Open 20,000.00 13,774.08 Signed 2020-04-24 2020-04-29 2020-05-20 2020-06-09 2020-05-31 2020-07-01 2020-06-10 2020-08-03 2021-06-11 développement rural et priority sectors Selection transport KM-PIDC-171503-CS-INDV / Recrutement d'un consultant Individual Value-chain development in pour l’étude de faisabilité IDA / 64230 Post Consultant Open 20,000.00 33,580.00 Completed 2020-05-08 2020-05-02 2020-06-05 2020-07-27 2020-06-19 2020-09-18 2020-07-03 2020-09-26 2020-08-03 2021-04-22 priority sectors pour l'opérationalisation des Selection CRDE KM-PIDC-173637-CS-CDS / Recrutement d'un gardien Value-chain development in IDA / 64230 Post Direct Selection Direct 2,500.00 2,311.08 Signed 2020-05-19 2020-05-13 2020-05-29 2020-05-14 2020-06-24 2020-05-15 2021-06-25 pour la securité du local du priority sectors projet KM-PIDC-174076-CS-CDS / Recrutement d'une femme de Value-chain development in IDA / 64230 Post Direct Selection Direct 2,780.00 3,032.27 Signed 2020-05-23 2020-05-29 2020-05-31 2020-06-01 2020-06-12 2020-06-02 2021-06-07 ménage pour l'entretient du priority sectors local du projet KM-PIDC-177356-CS-INDV / Recrutement d'un (e) Individual Project implementation and spécialiste en Communication IDA / 64230 Post Consultant Open 20,000.00 20,202.34 Signed 2020-06-05 2020-06-10 2020-07-15 2020-08-24 2020-07-22 2020-08-24 2020-08-04 2020-08-24 2021-08-04 coordination dans le cadre des actvités de Selection communication du projet PIDC KM-PIDC-177387-CS-INDV / Recrutement d'un secrétaire Individual de direction à la coordination Project implementation and IDA / 64230 Post Consultant Direct 9,000.00 7,797.25 Signed 2020-06-06 2020-06-11 2020-06-16 2020-06-13 2020-06-19 2020-06-15 2020-06-24 2020-06-15 2021-06-24 dans le cadre d'appui des coordination Selection activités de la coordination du projet. KM-PIDC-177394-CS-INDV / Individual Recrutement d'un(e) Project implementation and IDA / 64230 Post Consultant Direct 9,000.00 7,797.25 Signed 2020-06-06 2020-06-11 2020-06-16 2020-06-13 2020-06-19 2020-06-15 2020-06-24 2020-06-15 2021-06-24 secrétaire de direction et coordination Selection réceptionniste du projet KM-PIDC-186178-CS-INDV / Recrutement d'un(e) Expert en Individual chaines des valeurs agricole Project implementation and IDA / 64230 Post Consultant Open 20,000.00 0.00 Canceled 2020-08-17 2020-08-24 2020-09-16 2020-09-23 2020-10-03 2021-10-03 pour intégrer l'équipe de coordination Selection l'unité de gestion du projet (PIDC) KM-PIDC-186179-CS-INDV / Recrutement d'un (e) expert Individual Project implementation and en appui MPME et le climat IDA / 64230 Post Consultant Open 20,000.00 20,468.70 Signed 2020-08-17 2020-09-21 2020-09-16 2020-11-12 2020-09-23 2020-11-23 2020-10-03 2020-11-25 2021-10-03 coordination des affaires des secteurs Selection concernés KM-PIDC-191065-CS-INDV / Recrutement d'un Consultant Individual Value-chain development in International pour IDA / 64230 Post Consultant Limited 30,000.00 27,308.92 Signed 2020-09-15 2020-10-23 2020-09-30 2020-11-02 2020-10-07 2020-11-28 2020-10-21 2020-12-01 2020-11-20 priority sectors l'élaboration du code du Selection tourisme KM-PIDC-193678-CS-INDV / Recrutement d'un consultant national d'appui au consultant Individual international pour Value-chain development in IDA / 64230 Post Consultant Limited 8,000.00 2,131.61 Completed 2020-09-14 2020-09-23 2020-09-18 2020-10-12 2020-09-25 2020-10-24 2020-10-03 2020-10-26 2020-10-23 2020-12-01 l'élaboration des études de priority sectors Selection faisabilité sur l'opérationalisation des CRDE en Union des Comores KM-PIDC-193680-CS-INDV / Recrutement d'un Consultant National d'appui au Individual Value-chain development in Consultant International pour IDA / 64230 Post Consultant Limited 8,000.00 7,264.12 Signed 2020-09-14 2020-10-23 2020-09-19 2020-11-04 2020-09-26 2020-12-10 2020-10-06 2020-12-11 2020-11-05 priority sectors l'élaboration du Code du Selection Tourisme en Union des Comores KM-PIDC-194855-CS-INDV / Individual Project implementation and Recrutement d'un IDA / 64230 Post Consultant Open 15,000.00 48,696.49 Signed 2020-09-17 2020-09-24 2020-09-23 2020-09-24 2020-09-25 2020-09-24 2020-09-29 2019-10-01 2020-09-30 coordination Responsable Administratif et Selection Financier KM-PIDC-194847-CS-INDV / Individual Project implementation and Recrutement d'un IDA / 64230 Post Consultant Open 25,000.00 59,663.14 Signed 2020-09-17 2020-09-25 2020-09-23 2020-09-25 2020-09-25 2020-09-25 2020-09-29 2019-10-01 2020-09-30 coordination Coordonnateur du projet Selection Page 3 KM-PIDC-199976-CS-INDV / Recrutement d'un Consultant International pour Individual Project implementation and l'élaboartion d'une formation IDA / 64230 Post Consultant Direct 7,254.00 7,345.76 Completed 2020-10-16 2020-10-14 2020-10-17 2020-10-15 2020-10-19 2020-10-17 2020-10-19 2020-10-17 2020-10-23 2020-11-11 coordination en ligne sur la PPSD en faveur Selection du projet (PIDC) pour une durée de 3 jours consecutifs KM-PIDC-211517-CS-INDV / Recrutement d'un consultant Individual pour l'élaboration des tdrs Value-chain development in IDA / 64230 Post Consultant Limited 30,000.00 19,961.22 Signed 2020-12-28 2021-01-04 2021-01-12 2021-01-27 2021-01-19 2021-02-24 2021-01-31 2021-02-26 2021-03-17 dans les cadre des activités de priority sectors Selection passation des marchés du projet(PIDC) KM-PIDC-212324-CS-INDV / Recrutement d'un consultant Individual Value-chain development in pour une étude de faisabilité IDA / 64230 Post Consultant Limited 6,882.31 7,338.39 Signed 2021-01-11 2021-01-07 2021-01-26 2021-03-02 2021-02-10 2021-04-02 2021-02-24 2021-04-03 2021-05-25 priority sectors pour la réhabilitation du Selection bâtiment de l'UGP KM-PIDC-213864-CS-INDV / Recrutement d'un Consultant pour réaliser une étude Individual Value-chain development in technique pour l'adoption IDA / 64230 Post Consultant Open 35,000.00 0.00 Canceled 2021-01-18 2021-02-02 2021-02-24 2021-03-03 2021-03-13 2021-04-12 priority sectors d'Unité Pilote de Distillation Selection d'Economie d'Eau et de Bois aux Comores KM-PIDC-219843-CS-INDV / Recrutement d'un consultant pour la réalisation d' une Individual Value-chain development in étude de faisabilité pour la IDA / 64230 Post Consultant Open 25,000.00 9,536.49 Signed 2021-02-20 2021-03-04 2021-03-29 2021-04-08 2021-04-05 2021-05-10 2021-04-15 2021-05-10 2021-05-15 priority sectors mise en place d'un Office Selection National des forêts et zonnes cotières KM-PIDC-223976-CS-INDV / Recrutement d'un consultant pour la réalisation d'une étude de faisabilité pour la Individual Value-chain development in réhabilitation de la chambre IDA / 64230 Post Consultant Limited 13,765.00 9,666.62 Signed 2021-03-12 2021-03-27 2021-03-19 2021-04-10 2021-03-20 2021-05-17 2021-03-26 2021-05-19 2021-05-10 priority sectors d'Agriculture et de la Pêche et Selection d'assuer le suivi et le contrôle de la mise en oeuvre de cette activité KM-PIDC-227024-CS-INDV / Recrutement d'un consultant Individual pour l'indentification et étude Value-chain development in IDA / 64230 Post Consultant Open 20,000.00 0.00 Canceled 2021-04-05 2021-04-19 2021-05-02 2021-06-10 2021-05-07 2021-05-17 2021-07-01 pour la mise en place des priority sectors Selection fermes agricoles en Union des Comores KM-PIDC-228260-CS-INDV / Recrutement d'un Consultant pour la réalisation d'une étude Individual Value-chain development in d'évaluation et de réhbiliation IDA / 64230 Post Consultant Open 20,000.00 10,127.95 Signed 2021-04-10 2021-04-21 2021-05-07 2021-06-10 2021-05-17 2021-06-17 2021-05-23 2021-06-18 2021-07-02 priority sectors des pépinières vollailes dans Selection les CRDE (SIMBOUSSA, OUANI, FOMBONI) KM-PIDC-228853-CS-INDV / Recrutement d'un consultant pour réaliser une étude d' enquête et analyse des coûts pour les investissements en Individual infrastructures Value-chain development in Under IDA / 64230 Post Consultant Open 30,000.00 0.00 2021-04-15 2021-04-19 2021-05-17 2021-05-24 2021-06-03 2021-07-23 agricoles/d’élevage; les priority sectors Implementation Selection infrastructures commerciales/logistiques et les infrastructures touristiques d'accés au marché KM-PIDC-232056-CS-INDV / Recrutement d'un Consultant pour la réalisation d'une étude de conditionnement et de Individual Value-chain development in Under commercialisation des IDA / 64230 Post Consultant Open 35,000.00 0.00 2021-05-05 2021-05-03 2021-06-01 2021-06-08 2021-06-18 2021-08-02 priority sectors Implementation produits agricoles ( vivrière, Selection rentes fruite et légumes ) à l'intérieure et à l'extérieure du pays) KM-PIDC-232057-CS-INDV / Recrutement d'un consultant pour l'élaboration d'une étude Individual Value-chain development in Under stratégique de IDA / 64230 Post Consultant Open 30,000.00 0.00 2021-05-05 2021-06-21 2021-06-01 2021-06-06 2021-06-12 2021-07-27 priority sectors Implementation développement de Selection l'abroculture, en Union des Comores KM-PIDC-236025-CS-INDV / Recrutement d'un consultant Individual Value-chain development in pour mettre à jour le Project IDA / 64230 Post Consultant Direct 8,117.00 8,342.60 Signed 2021-05-26 2021-05-27 2021-06-10 2021-05-31 2021-06-17 2021-06-10 2021-06-27 2021-06-11 2021-07-07 priority sectors Procurement Strategy for Selection Development ( PPSD) du PIDC KM-PIDC-239546-CS-INDV / Relance du poste du recrutement d'un consultant Individual Value-chain development in Under pour l'indentification et étude IDA / 64230 Post Consultant Open 20,000.00 0.00 2021-06-17 2021-06-21 2021-07-14 2021-07-24 2021-08-03 2021-09-17 priority sectors Implementation pour la mise en place des Selection fermes agricoles, aux Comores KM-PIDC-239551-CS-INDV / Relance du poste de Individual recrutement d'un Expert en Value-chain development in Under IDA / 64230 Post Consultant Open 20,000.00 0.00 2021-06-16 2021-06-21 2021-07-13 2021-07-23 2021-08-02 2022-08-02 Chaines des Valeurs Agricoles priority sectors Implementation Selection pour l'Unité de Gestion du projet Page 4 KM-PIDC-240845-CS-INDV / Etude de faisabilité pour la mise en place des centres de séchage et de transformations Individual Value-chain development in Pending des produits de rente (girofle, IDA / 64230 Post Consultant Open 30,000.00 0.00 2021-06-25 2021-07-24 2021-07-27 2021-08-01 2021-09-15 priority sectors Implementation vanille ect…) ; Selection Unités de stockage au frais ou entreposage des fruits et légumes à énergie solaire etc. Page 5 PROCUREMENT PLAN (Textual Part) Project information: Rwanda: Electricity Access and Quality Improvement Project (P172594) Project Implementation agency: Electricity Development Company Limited and Development Bank of Rwanda Date of the Procurement Plan: April 2020 Period covered by this Procurement Plan: 18 months Thresholds, Procurement Methods, and Prior Review 1) Goods, Works, and Non-Consulting Services Procurement Arrangement for Goods, Works, Consulting services and Non- consulting Services Procurement Selection Method Thresholds for Method (US$ Category and Market equivalent) Approach Goods and IT RFB - Open Equal to or more than 1 million Systems International RFB - Open National – < $1 million and >$ 2,500 Open Tender as per Rwanda PPL RFQ – Limited Less than $ 2,500or as stipulated in Rwanda Procurement Regulations Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations Non- Open International Equal to or More than 1 million Consulting Open National (Non- Less than 1 million Services consulting Services) - Open Tender as per Rwanda PPL RFQ – Limited Less than $ 2,500or as stipulated in Rwanda Procurement Regulations Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations Works, Supply RFB - Open Equal to or more than 10 million & Installation International RFB - Open National – < $10 million and >$ 2,500 Open Tender as per Ministerial Order 2014 RFQ – Limited Less than $ 2,500or as stipulated in Rwanda Procurement Regulations Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations 2) Selection methods of procurement of Consultants' Services (Firms): The Approved Selection Methods as reflected in the Section VII of the procurement regulations. Selection Thresholds for Methods Procurement Method and arrangement * Quality and Cost As per requirements of para 7.3 of the Bank’s Based Selection Procurement Regulations (QCBS) Quality Based As per requirements of para 7.8 to 7.10 of the Selection (QBS) Regulations Selection based on a As per requirements of para 7.4 and 7.5 of the Fixed Budget (FBS) Regulations Selection Based on As per requirements of para 7.6 and 7.7 of the Least Cost Basis Regulations (LCS) Selection based on As per requirements of para 7.11 and 7.12 of the Consultant’s Regulations Qualification (CQ) Contracts estimated to cost equivalent of US$ 300,000 or less per contract Direct Selection Must meet the requirements of Para 7.13 to 7.15 of the Regulations, and with prior clearance by the Bank thru procurement plan. UN Agencies In accordance with paragraph 7.27 & 7.28 of the Procurement Regulations and with prior agreement in Procurement plan with the Bank NGOs In accordance with paragraph 7.29 of the Procurement Regulations. *procurement arrangements like direct contracting, use of SOEs, third party monitors, servants need, results based arrangements is not expected. There will no need for prequalification in the procurement arrangements under this project. The short list may consist of all National consultants in case the estimated cost is less than USD 200,000 per contract for consulting services, USD 300,000 for Engineering and Construction Supervision. 3) Procurement methods for Selection of Individual Consultants (IC): The Approved Selection Methods as reflected in the Section VII of the Procurement Regulations. Method of Procurement Thresholds for Methods Open Competitive Selection As per requirements of para 7.36 and 7.37 of the Regulations Limited Competitive As per requirements of para 7.38 of the Selection Regulations Direct Must meet the requirements of Para 7.39 of the Regulations, and with prior agreement in PP with the Bank 4) Prior Procurement Arrangements: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection. Type of procurement Bank’s Prior review threshold * Works All procurements estimated to cost more than USD 10million Goods All procurement estimated to cost more than USD 2 Million Consultant Firm All procurements estimated to cost more than USD 2 million Consultant Individual All procurement estimated to cost more than USD 300,000 *Substantial Risk: These thresholds are for the purposes of the initial procurement plan for the first 12 months. The thresholds may be increased or decreased based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. 5) For contracts subject to prior review, the Borrower shall seek the Bank’s no objection before agreeing to: (a) an extension of the stipulated time for execution of a contract that has an impact on the planned completion of the project; (b)any material modification of the scope of the Works, Goods, Non-consulting services or Consulting Services, or other significant changes to the terms and conditions of the contract; (c) any variation order or contract amendment (except in cases of extreme urgency), including due to extension of time, that singly or combined with all previous variation orders or amendments, increases the original contract amount by more than 15% (fifteen percent); or (d)the proposed termination of the contract. The Borrower / IA shall provide a copy of all amendments to the contract to the Bank for its records. 1. Pre-qualification: No 2. Any Other Special Procurement Arrangements: Not Applicable 3. Domestic Preference. The provision of domestic preference shall not be applied in the evaluation of bids in accordance with Annex VI of the Regulations. 4. Reference to Standard Procurement Documents Bank’s Standard RFB Works &Goods and RFP Consulting Services dated January 2017 will be used as a base and incorporating suitable modifications and the same would be agreed with the Bank subject to international competition. 5. Other Relevant Procurement Information: All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. At any time, the Independent Procurement Reviews can be carried out by the Bank / by the consultants hired by the Bank. Even for Post Review cases, the inputs of Bank on Technical Specifications / TORs may be obtained by project. 6. Use of E-Procurement: The World Bank has assessed the adequacy of Government of Rwanda’s eProcurement system (http://www.umucyo.gov.rw/) and given go ahead for use of e-Procurement system for selection methods with Post Review contracts as approved in the Procurement Plan. PROCUREMENT Rwanda : Rwanda - Energy Access and Quality Improvement Project PLAN General Information Country: Rwanda Bank’s Approval Date of the Original Procurement Plan: 2021-04-29 2021-05-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172594 GPN Date: Project Name: Rwanda - Energy Access and Quality Improvement Project Loan / Credit No: IDA / 67760 Rwanda Energy Group - Energy Development Corporation Limited Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National RW-REG/EDCL-229976-CW- Procurement Under Enhancing the Efficiency of Single Stage - One 11,000,000.0 2023-07- RFB / Rehabilitation of the IDA / 67760 Post Request for Bids Open - International Document - 1 0.00 Implementat 2021-08-04 2021-06-18 2021-08-25 2021-10-24 2021-12-23 2022-01-29 Electricity Service Envelope 0 23 Ntaruka Hydro Power Plant Envelope process ion (Non Bank-SPD) RW-REG/EDCL-230153-CW- RFB / Electrification of Bwira, National Gatumba, Hindiro, Kabaya, Procurement Increasing Access to Grid Single Stage - One 20,159,763.0 Under 2023-04- Kageyo, Kavumu, Matyazo, IDA / 67760 Prior Request for Bids Open - International Document - 1 0.00 2021-04-25 2021-05-16 2021-07-15 2021-08-26 2021-10-20 Electricity Envelope 0 Review 13 Muhanda, Muhororo, Ndaro, Envelope process Nyange, Sovu sectors of (Non Bank-SPD) NGORORERO District RW-REG/EDCL-230155-CW- RFB / Electrification of National Mukamira, Jenda, Bigogwe, Procurement Increasing Access to Grid Single Stage - One 15,051,143.0 Under 2023-04- Kabatwa, Kintobo, Rugera, IDA / 67760 Prior Request for Bids Open - International Document - 1 0.00 2021-04-25 2021-05-16 2021-07-15 2021-08-26 2021-10-20 Electricity Envelope 0 Review 13 Rurembo, Shyira, Jomba, Envelope process Muringa, Rambura, Karago (Non Bank-SPD) sectors of NYABIHU District RW-REG/EDCL-230878-CW- RFB / Electrification of Bukure; Bwisige; Byumba; Cyumba; National Giti; Kageyo; Manyagiro; Procurement Pending Miyove; Mukarange; Muko; Increasing Access to Grid Single Stage - One 11,916,143.0 2022-12- IDA / 67760 Post Request for Bids Open - International Document - 1 0.00 Implementat 2020-12-15 2021-01-05 2021-03-06 2021-04-17 2021-06-11 Mutete; Nyamiyaga; Electricity Envelope 0 03 Envelope process ion Nyankenke; Rubaya; Rukomo; (Non Bank-SPD) Rushaki; Rutare; Ruvune; Rwamiko; and Shangasha sectors of GICUMBI District RW-REG/EDCL-230880-CW- RFB / Electrification of Bungwe; Butaro; Cyanika; National Cyeru; Gahunga; Gatebe; Procurement Pending Increasing Access to Grid Single Stage - One 12,262,143.0 2022-12- Gitovu; Kagogo; Kinoni; IDA / 67760 Post Request for Bids Open - International Document - 1 0.00 Implementat 2020-12-15 2021-01-05 2021-03-06 2021-04-17 2021-06-11 Electricity Envelope 0 03 Kinyababa; Kivuye; Nemba; Envelope process ion Rugarama; Rugengabari; (Non Bank-SPD) Ruhunde; Rusarabuye; Rwerere sectors of BURERA District RW-REG/EDCL-230879-CW- National RFB / Installation of automatic Procurement Pending Enhancing the Efficiency of Single Stage - One 2022-12- voltage regulators on 220kV IDA / 67760 Post Request for Bids Open - International Document - 1 7,640,000.00 0.00 Implementat 2020-12-15 2021-01-05 2021-03-06 2021-04-17 2021-06-11 Electricity Service Envelope 03 Subastations (Shango and Envelope process ion Rwabusoro) (Non Bank-SPD) 010/W/2021-2022 /ICB/RUEAP/EAQIP / Design, supply, and installation of low voltage and medium voltage Request for Bids - lines and service connections Increasing Access to Grid Single Stage - One Works (without 29,474,900.0 Under 2023-10- in Ruharambuga, Bushekeri, IDA / 67760 Prior Request for Bids Open - International 0.00 2021-06-20 2021-06-25 2021-08-06 2021-09-05 2021-10-10 Electricity Envelope prequalification) 0 Review 10 Bushenge, Cyato, Gihombo, SPD Kagano, Kanjongo, Karambi, Karengera, Kirimbi, Macuba, Nyabitekeri, Mahembe, Rangiro, Shangi in Nyamashek 011/W/2021- 2022/ICB/RUEAP/EAQIP / Design, supply, and installation of low voltage and medium voltage lines and Request for Bids - service connections in Increasing Access to Grid Single Stage - One Works (without 21,277,000.0 Under 2023-10- IDA / 67760 Prior Request for Bids Open - International 0.00 2021-06-20 2021-06-25 2021-08-06 2021-09-05 2021-10-10 Bugarama, Butare, Bweyeye, Electricity Envelope prequalification) 0 Review 10 Gikundamvura, Gashonga, SPD Giheke, Gihundwe, Gitambi, Kamembe, Muganza, Mururu, Nkanka, Nkombo, Nkungu, Nyakabuye, Nyakarenzo, Nzah GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-REG/EDCL-230144-GO- RFB / Supply and installation Pending Enhancing the Efficiency of Single Stage - One of smart metering for all IDA / 67760 Prior Request for Bids Open - International 4,500,000.00 0.00 Implementati 2021-04-30 2021-05-30 2021-07-29 2021-09-27 2021-10-25 2022-10-20 Electricity Service Envelope distribution transformers and on medium/large customer RW-REG/EDCL-230148-GO- Pending Enhancing the Efficiency of Single Stage - One RFB / Supply and Installation IDA / 67760 Prior Request for Bids Open - International 6,000,000.00 0.00 Implementati 2022-08-04 2022-08-25 2022-10-24 2022-12-05 2023-01-29 2024-01-24 Electricity Service Envelope of GiS system on RW-REG/EDCL-230157-GO- RFB / Installation of power Pending Enhancing the Efficiency of Single Stage - One system stabilizers and IDA / 67760 Post Request for Bids Open - International 3,500,000.00 0.00 Implementati 2021-12-15 2022-01-05 2022-03-06 2022-04-17 2022-06-14 2023-05-20 Electricity Service Envelope governing systems on main on generators Page 1 RW-REG/EDCL-230640-GO- RFB / Electrification of Busogo; Cyuve; Gacaca; Gashaki; Gataraga; Kimonyi; Pending Kinigi; Muhoza; Musanze; Increasing Access to Grid Single Stage - One IDA / 67760 Prior Request for Bids Open - International 9,216,120.00 0.00 Implementati 2021-05-15 2021-05-30 2021-05-30 2021-05-30 2021-05-30 2022-11-21 Muko, Nkotsi; Nyange; Electricity Envelope on Remera; Rwaza; Shingiro sectors of MUSANZE District (supply of electrical materials only) RW-REG/EDCL-230639-GO- RFB / Electrification of Base; Bushoki; Buyoga; Cyinzuzi; Cyungo; Kinihira; Kisaro; Pending Masoro; Mbogo; Murambi; Increasing Access to Grid Single Stage - One IDA / 67760 Prior Request for Bids Open - International 10,476,480.00 0.00 Implementati 2021-05-15 2021-05-30 2021-05-30 2021-05-30 2021-05-30 2022-11-21 Ngoma; Ntarabana; Rukozo; Electricity Envelope on Rusiga; Shyorongi; Tumba sectors of RULINDO District (Supply of electrical materials only) RW-REG/EDCL-230638-GO- RFB / Electrification of Bugeshi, Busasamana, Cyanzarwe, Gisenyi, Kanama, Pending Kanzenze, Mudende, Increasing Access to Grid Single Stage - One IDA / 67760 Prior Request for Bids Open - International 8,794,000.00 0.00 Implementati 2021-05-15 2021-05-15 2021-05-15 2021-05-15 2021-05-30 2022-11-21 Nyakiriba, Nyamyumba, Electricity Envelope on Nyundo, Rubavu, Rugerero sectors of RUBAVU District (supply of electrical materials only) RW-REG/EDCL-235852-GO- Technical Assistance, Under RFB / Supply of 2 Trucks and Single Stage - One IDA / 67760 Institutional Capacity Building Post Request for Bids Open - International 952,212.00 0.00 Implementati 2021-06-01 2021-06-16 2021-06-16 2021-07-28 2021-08-27 2021-10-01 2021-12-30 5 pick ups for Project Envelope and Implementation Support on operations Technical Assistance, Pending RW-REG/EDCL-236070-GO- Single Stage - One IDA / 67760 Institutional Capacity Building Post Request for Bids Open - National 45,000.00 0.00 Implementati 2021-06-15 2021-06-20 2021-08-01 2021-08-31 2021-10-05 2021-12-19 RFB / Acquisition of Furniture Envelope and Implementation Support on RW-REG/EDCL-236090-GO- RFB / Electrification of Bwishyura, Gishyita, Gitesi, Mubuga, Murambi, Murundi, Pending Increasing Access to Grid Single Stage - One Mutuntu, Rubengera, IDA / 67760 Post Request for Bids Open - International 2,372,000.00 0.00 Implementati 2021-06-15 2021-06-20 2021-08-01 2021-08-31 2021-10-05 2022-10-05 Electricity Envelope Rugabano, Rwankuba, on Twumba sectors of KARONGI District (Design and Installation works only) RW-REG/EDCL-236100-GO- RFB / Electrification of Boneza, Gihango, Kigeyo, Kivumu, Manihira,Mukura, Pending Increasing Access to Grid Single Stage - One Murunda,Musasa,Mushonyi,M IDA / 67760 Post Request for Bids Open - International 3,731,000.00 0.00 Implementati 2021-06-15 2021-06-20 2021-08-01 2021-08-31 2021-10-05 2022-10-05 Electricity Envelope ushubati,Nyabirasi,Ruhango,R on usebeya sectors of RUTSIRO District (Design and Installation works only) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-REG/EDCL-235753-NC- Technical Assistance, Pending Single Stage - One RFB / Acquisition of financial IDA / 67760 Institutional Capacity Building Post Request for Bids Limited 44,674.96 0.00 Implementati 2021-06-15 2021-06-20 2021-08-01 2021-08-31 2021-10-05 2021-12-04 Envelope management software and Implementation Support on RW-REG/EDCL-238709-NC- RFB / Supply of clean cooking Increasing Access to Off-Grid Pending Single Stage - One RBF information management IDA / 67760 Electricity and Clean Cooking Post Request for Bids Open - National 220,000.00 0.00 Implementati 2021-06-17 2021-06-22 2021-08-03 2021-08-24 2021-09-22 2022-03-21 Envelope tool (software development, Solutions on training of users, etc) RW-REG/EDCL-238704-NC- Increasing Access to Off-Grid Pending DIR / Provision of domestic IDA / 67760 Electricity and Clean Cooking Post Direct Selection Direct 60,000.00 0.00 Implementati 2021-06-18 2021-06-23 2021-07-06 2023-07-06 cooking appliance testing Solutions on services CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-REG/EDCL-232319-CS- QCBS / Consultancy Services of Supervision of Rural Technical Assistance, Quality And Cost- Electrification Construction IDA / 67760 Institutional Capacity Building Prior Open - International 3,600,000.00 0.00 Under Review 2020-12-15 2020-12-29 2021-03-27 2021-04-24 2021-06-23 2021-07-28 2021-08-25 2026-06-20 Based Selection Works under Rwanda Energy and Implementation Support Access and Quality Improvement Project RW-REG/EDCL-230888-CS- QCBS / Consultancy Services: Technical Assistance, Organization and Supervision Quality And Cost- IDA / 67760 Institutional Capacity Building Prior Open - International 2,000,000.00 0.00 Under Review 2020-12-15 2020-12-29 2021-03-27 2021-04-24 2021-06-23 2021-07-28 2021-09-01 2025-08-11 of Capacity Building Programs Based Selection and Implementation Support to Strengthen the Energy Sector in Rwanda RW-REG/EDCL-235737-CS- QCBS / Hiring a consultant firm (s) as Independent Technical Assistance, Quality And Cost- Under Verification Agency (IVAs) for IDA / 67760 Institutional Capacity Building Prior Open - International 700,000.00 0.00 2021-05-26 2021-06-10 2021-06-16 2021-07-30 2021-08-27 2021-09-26 2021-10-31 2021-12-05 2023-12-05 Based Selection Implementation verification of solar home and Implementation Support systems and clean cooking claims Page 2 RW-REG/EDCL-236115-CS- QCBS / SUPERVISION FIRM Enhancing the Efficiency of Quality And Cost- IDA / 67760 Post Open - International 460,000.00 0.00 Under Review 2021-08-16 2021-06-06 2021-09-06 2021-10-20 2021-11-17 2021-12-17 2022-01-21 2022-02-25 2024-02-25 FOR NTARUKA HPP, SVCs AND Electricity Service Based Selection VOLTAGE STABILIZER RW-REG/EDCL-235748-CS- QCBS / Hiring a Supervision firm for design, supply and installation of low voltage and Enhancing the Efficiency of Quality And Cost- IDA / 67760 Post Open - International 460,000.00 0.00 Canceled 2021-06-01 2021-06-22 2021-08-05 2021-09-02 2021-10-02 2021-11-06 2021-12-11 2024-03-30 medium voltage lines and Electricity Service Based Selection service connections in Ngoreroro and Nyabihu Districts RW-REG/EDCL-238721-CS- Increasing Access to Off-Grid QCBS / Recruitment of a Quality And Cost- Pending IDA / 67760 Electricity and Clean Cooking Post Open - National 240,000.00 0.00 2021-06-21 2021-07-12 2021-08-25 2021-09-22 2021-10-22 2021-11-26 2021-12-31 2023-12-31 market facilitator firm for Based Selection Implementation Solutions clean cooking technologies RW-REG/EDCL-238713-CS- QCBS / Recruitment of a Increasing Access to Off-Grid communication firm to Quality And Cost- IDA / 67760 Electricity and Clean Cooking Post Open - National 484,600.00 0.00 Under Review 2021-06-18 2021-06-24 2021-07-09 2021-08-22 2021-09-19 2021-10-19 2021-11-23 2021-12-28 2023-12-28 support the campaign for Based Selection Solutions clean cooking awareness and behavior change INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 PROCUREMENT PLAN Project information: Colombia - Subnational Strengthening and Mainstreaming of Transparency in the Extractives Sector - Implementation of the Extractive Industries Transparency Project Implementation agency: Ministerio de Minas y Energía - Minminas Date of the Procurement Plan: 19/06/2020 Period covered by this Procurement Plan: 19/06/2020 – 31/05/2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. No international contracts are foreseen for this project. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Colombia: Subnational Strengthening and Mainstreaming of Transparency in the Extractive Sector PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2020-07-28 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169919 GPN Date: 2020-08-24 Project Name: Colombia: Subnational Strengthening and Mainstreaming of Transparency in the Extractive Sector Loan / Credit No: TF / A9854 M Executing Agency(ies): inistry of Mines and Energy WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MINMINAS-197529-NC- RFQ / Desarrollar una herramienta de seguimiento a la información territorial, que permita conocer los diálogos Supporting increased demand Request for Single Stage - One adelantados a nivel TF / A9854 Post Limited 38,927.75 28,085.21 Signed 2020-10-14 2020-10-08 2020-11-04 2020-10-30 2020-12-31 for transparency Quotations Envelope subnacional, mejorar los datos del sector y hacer análisis de la información, mediante la adquisición de licencias y servicios de CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MINMINAS-184962-CS- Consultant Project Management and Pending LCS / Contratar una auditoria TF / A9854 Post Qualification Open - National 9,728.08 0.00 2020-12-15 2021-01-20 2021-01-27 2021-03-03 2021-03-19 2021-05-31 Operational Support Implementation externa de cierre del Selection proyecto. CO-MINMINAS-184050-CS- CQS / Formular una estrategia Identification of four selected de formación y generación de Consultant regions/ municipalities, capacidades locales que TF / A9854 Post Qualification Limited 87,544.00 101,987.21 Completed 2020-08-20 2020-08-24 2020-09-04 2020-09-24 2020-10-06 2020-10-10 2020-10-14 2020-10-15 2020-12-31 2020-12-31 stakeholder training and permitan replicar un modelo Selection capacity building de EITI en el ámbito subnacional. CO-MINMINAS-184945-CS- CQS / Desarrollar una herramienta de seguimiento a la información territorial, que Consultant Supporting increased demand permita conocer los diálogos TF / A9854 Post Qualification Open - National 65,914.65 0.00 Canceled 2020-08-20 2020-09-18 2020-09-25 2020-11-06 2020-11-20 2020-12-31 for transparency adelantados a nivel Selection subnacional, mejorar los datos del sector y hacer análisis de la información. CO-MINMINAS-184949-CS- CQS / Expansión de conocimientos y sensibilización en el ámbito local, sobre el impacto de la Consultant Supporting sub-national EITI Under transparencia del sector TF / A9854 Post Qualification Open - National 191,879.00 0.00 2021-05-24 2021-05-26 2021-06-16 2021-07-21 2021-07-29 2021-08-28 2022-01-12 reporting Implementation extractivo en los municipios Selection priorizados, elaboracion de una estrategia de Comunicaciones e Implementación. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MINMINAS-184955-CS- INDV / Desarrollo de capacidades tecnológicas en Individual Supporting sub-national EITI Pending cuanto a la transmisión y TF / A9854 Post Consultant Open 14,085.35 0.00 2021-01-20 2021-03-10 2021-03-31 2021-05-05 2021-11-01 reporting Implementation difusión de datos públicos Selection relevantes sobre el sector extractivo CO-MINMINAS-184047-CS- INDV / Apoyar técnicamente la ejecución del Convenio de donación Convenio de Donación EGPS No TF0A9854- Individual Project Management and CO, de acuerdo con lo TF / A9854 Post Consultant Direct 15,087.00 15,678.00 Completed 2020-08-20 2020-08-26 2020-08-21 2020-08-26 2020-08-21 2020-08-26 2020-08-26 2020-08-26 2020-12-20 2020-12-20 Operational Support establecido en el Estándar EITI Selection Internacional vigente, los parámetros y requerimientos del Ministerio de Minas y Energía y el CTN. Page 1 CO-MINMINAS-184017-CS- INDV / Desempeñar en el Grupo de Ejecución Estratégica del Sector Extractivo, las actividades Individual Project Management and como especialista en TF / A9854 Post Consultant Direct 1,509.00 1,567.80 Completed 2020-08-20 2020-08-26 2020-08-21 2020-08-27 2020-08-21 2020-08-27 2020-08-26 2020-08-27 2020-12-20 2020-12-20 Operational Support adquisiciones, en los procesos Selection de selección y contratación de bienes, servicios de consultoría y no consultoría que sean requeridos. CO-MINMINAS-237684-CS- INDV / Especialista en adquisiciones, en los procesos de selección y contratación del proy: Fortalecimiento Individual Project Management and subnacional y TF / A9854 Post Consultant Direct 7,452.00 0.00 Under Review 2021-06-07 2021-06-22 2021-06-17 2021-07-08 2021-08-12 2022-02-08 Operational Support transversalización de la Selection transparencia en el sector extractivo. Implementación del Proyecto de Transparencia de las Industrias Extractivas Page 2 PROCUREMENT PLAN Project information: Freetown Emergency Response Project (P166075) Project Implementation agency: Ministry of Finance Date of the Procurement Plan: May 2018 Period covered by this Procurement Plan: 18 Months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Act, 216 of the Republic of Sierra Leone, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables Works: No applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information:- (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the the Project): Thresholds*, Procurement Methods, and Prior Review Expenditure Contract (C) Value Procurement Contracts Subject to No Category Threshold* [eq. USD] Method Prior Review /[eq. US$] Open Competition All contracts at or above USD 2 million are International Market subject to international advertising and C ≥ 5,000,000 Approach and Direct the use of the Bank’s SPDs (or other Goods, IT and Contracting documents agreed with the Bank). 2 non-consulting services Open Competition : National Market None 100,000 < C < 5,000,000 Approach C ≤ 100,000 RfQ None Expenditure Contract (C) Value Procurement Contracts Subject to No Category Threshold* [eq. USD] Method Prior Review /[eq. US$] All contracts at or above USD 300,000 are for subject to international advertising and C < 300,000 Consulting Services the use of the Bank’s SPDs (or other documents agreed with the Bank). National shortlist for 3 selection of for All contracts at or above USD 300,000 are consultant firms Engineering and subject to international advertising and C ≤ 500,000 Construction the use of the Bank’s SPDs (or other Supervision documents agreed with the Bank). Selection of ≥ 300,000 ≥ 300,000 4 Individual All Approaches consultants Training, Workshops, Based on approved This line activity is not subject to 5 Study Tours All Values Annual Work Plan & procurement Review. Budgets (AWPB) by TTL (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will need for prequalification in the procurement arrangements under this project) *These thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. ** Short lists of consultants for services estimated to cost less US$300,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. However, if foreign firms have expressed interest, they will not be excluded from consideration. Prequalification. Not expected for the packages of goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: the project team will prepare Procurement manuals. The Procurement Plan/Manual will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: Not Applicable Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Sierra Leone : Freetown Emergency Recovery Project PLAN General Information Country: Sierra Leone Bank’s Approval Date of the Original Procurement Plan: 2018-05-14 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166075 GPN Date: Project Name: Freetown Emergency Recovery Project Loan / Credit No: IDA / D2750 Ministry of Finance and Economic Development Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SL-MOFED-149753-CW-RFB Component 1: Rehabilitation / Reconstruction of affected Single Stage - One 1,792,089.9 2020-09- IDA / D2750 of Public Infrastructure and Post Request for Bids Open - National 2,450,000.00 Completed 2019-12-10 2020-01-30 2019-12-15 2020-02-07 2020-01-26 2020-03-12 2020-02-25 2020-04-09 2020-03-31 2020-05-29 pedestrian and vehicular Envelope 4 27 Slope Stabilization bridges SL-MOFED-152779-CW-RFB / Reconstructed of Eleven Component 2: Strengthening Single Stage - One 2020-10- Culverts at Kamayama, IDA / D2750 Post Request for Bids Open - National 430,000.00 388,620.19 Completed 2020-01-09 2020-02-06 2020-01-14 2020-03-14 2020-02-25 2020-04-01 2020-03-26 2020-05-10 2020-04-30 2020-06-05 institutional capacity Envelope 27 Kaningo, Juba, Charlotte, and Regent communities SL-MOFED-156729-CW-RFB Component 1: Rehabilitation Pending Single Stage - One 2020-11- / Water Proofing works to IDA / D2750 of Public Infrastructure and Post Request for Bids Open - National 400,000.00 0.00 Implementat 2020-02-04 2020-02-09 2020-03-22 2020-04-21 2020-05-26 Envelope 22 Babadorie Raw Water Slope Stabilization ion Reservoir SL-MOFED-156753-CW-RFB Component 1: Rehabilitation Single Stage - One 2020-11- / Babadorie to Hill Station IDA / D2750 of Public Infrastructure and Post Request for Bids Open - National 465,000.00 817,420.82 Completed 2020-02-03 2020-03-11 2020-02-08 2020-03-13 2020-03-21 2020-04-17 2020-04-20 2020-06-01 2020-05-25 2020-06-25 Envelope 21 Water Networks Improvement Slope Stabilization SL-MOFED-156751-CW-RFB Component 1: Rehabilitation Single Stage - One 1,002,084.3 2020-11- / Babadorie Water Treatment IDA / D2750 of Public Infrastructure and Post Request for Bids Open - National 1,135,000.00 Completed 2020-02-04 2020-03-17 2020-02-09 2020-03-18 2020-03-22 2020-04-29 2020-04-21 2020-06-01 2020-05-26 2020-06-25 Envelope 7 22 Plant Rehabilitation Works Slope Stabilization SL-MOFED-164508-CW-RFP / Construction of a Ranger Pending Component 2: Strengthening Request for Single Stage - Two 2022-07- Station to commemorate IDA / D2750 Post Open - National 70,000.00 0.00 Implementat 2020-05-19 2020-08-04 2020-08-04 2020-05-24 2020-10-13 2021-01-30 institutional capacity Proposals Envelope 24 those who lost their lives in ion the Landslide SL-MOFED-168526-CW-RFQ Pending Component 2: Strengthening Request for Single Stage - One 2020-12- / Demarcation of Sugar Loaf, IDA / D2750 Post Limited 35,000.00 0.00 Implementat 2020-04-21 2020-06-16 institutional capacity Quotations Envelope 13 Motomeh Area ion Request for SL-MOFED-236187-CW-RFQ Quotations - Small Pending / DEMOLITION OF NINE Component 3: Project Request for Single Stage - One 2022-01- IDA / D2750 Post Open - National Works 35,000.00 0.00 Implementat 2021-05-29 2021-07-24 HOUSES IN THE RED ZONE AT Management Quotations Envelope 20 (Emergency) SPD - ion MOTORMEH MUDSLIDE SITE Competitive GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-79582-GO-RFQ / Under Component 3: Project Request for Single Stage - One Procurement of IDA / D2750 Post Limited 26,000.00 0.00 Implementati 2018-10-13 2018-11-28 2018-12-08 2019-06-06 Management Quotations Envelope laptop,printers and other on office equipment SL-MOFED-79583-GO-RFQ / Under Component 3: Project Request for Single Stage - One Procure basic office furniture IDA / D2750 Post Limited 15,000.00 0.00 Implementati 2018-10-13 2018-11-28 2018-12-08 2019-06-06 Management Quotations Envelope and fittings for PCU on SL-MOFED-85752-GO-RFB / Under Procurement of three (3) Component 3: Project Single Stage - One IDA / D2750 Post Request for Bids Open - National 190,000.00 0.00 Implementati 2018-11-19 2018-12-05 2018-11-24 2019-01-08 2019-01-05 2019-02-05 2019-02-04 2019-03-19 2019-03-11 2019-09-07 Station Wagons for PCU and Management Envelope on PFMU SL-MOFED-108567-GO-RFB Component 1: Rehabilitation Single Stage - One / Procurement and supply of IDA / D2750 of Public Infrastructure and Post Request for Bids Open - National 450,000.00 315,000.00 Completed 2019-04-01 2019-04-05 2019-04-06 2019-04-05 2019-05-18 2019-05-06 2019-06-17 2019-05-15 2019-07-22 2019-06-14 2020-01-18 2019-09-19 Envelope three Water Bowsers Slope Stabilization SL-MOFED-181096-GO-DIR / Replacement sensors for Under Component 2: Strengthening Lungi , and Redundant IDA / D2750 Post Direct Selection Direct 34,200.00 0.00 Implementati 2020-06-22 2021-01-29 2020-06-27 2020-08-01 2021-01-28 institutional capacity station for both at Lungi on International Airport and Makeni Station SL-MOFED-181299-GO-RFB / PPE and Structural Fire Component 2: Strengthening Single Stage - One IDA / D2750 Post Request for Bids Open - National 238,000.00 225,949.73 Completed 2020-06-22 2020-06-30 2020-06-27 2020-06-30 2020-08-08 2020-07-21 2020-09-07 2020-07-21 2020-10-12 2020-09-15 2021-04-10 2021-04-15 Equipment for Sierra Leone institutional capacity Envelope National Fire Force SL-MOFED-181857-GO-RFQ / Procurement of Component 2: Strengthening Request for Single Stage - One Communication equipment IDA / D2750 Post Open - National 45,800.00 38,360.01 Completed 2020-06-30 2020-07-20 2020-08-25 2020-08-11 2021-02-21 2021-02-25 institutional capacity Quotations Envelope for National Fire Force Sierra Leone SL-MOFED-181868-GO-RFQ / Procurement of Vehicle Component 2: Strengthening Request for Single Stage - One Rescue equipment for the IDA / D2750 Post Open - National 34,650.00 64,284.69 Completed 2020-06-30 2020-08-25 2020-10-19 2021-02-21 2021-02-16 institutional capacity Quotations Envelope Sierra Leone National Fire Force NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-61750-CS-QCBS / Consultancy service to Component 1: Rehabilitation undertake Feasibility Study, Quality And Cost- Under IDA / D2750 of Public Infrastructure and Post Open - International 300,000.00 0.00 2018-05-15 2018-05-15 2018-06-05 2018-07-19 2018-10-01 2018-08-16 2018-09-15 2018-10-20 2018-11-24 2019-11-24 Design Support, and Based Selection Implementation Slope Stabilization Safeguard Study on bridges, roads and culverts SL-MOFED-61760-CS-QCBS / Consultancy service to Component 1: Rehabilitation Consultant conduct a capacity needs IDA / D2750 of Public Infrastructure and Post Qualification Open - International 200,000.00 0.00 Canceled 2018-05-15 2018-05-15 2018-06-05 2018-06-07 2018-07-19 2018-11-01 2018-08-18 2018-09-22 2019-03-21 assessment of emergency Slope Stabilization Selection preparedness and response SL-MOFED-86294-CS-QCBS / Consultancy Service to Component 1: Rehabilitation Quality And Cost- conduct a capacity needs IDA / D2750 of Public Infrastructure and Prior Open - International 200,000.00 0.00 Canceled 2018-11-12 2018-12-03 2019-01-16 2019-02-13 2019-03-15 2019-04-19 2019-05-24 2020-05-23 Based Selection assessment of emergency Slope Stabilization preparedness and response SL-MOFED-97214-CS-CQS / Consultancy Service to Component 1: Rehabilitation Consultant Pending conduct needs assessment of IDA / D2750 of Public Infrastructure and Post Qualification Open - International 200,000.00 0.00 2019-02-04 2019-02-25 2019-04-10 2019-05-10 2019-06-14 2019-12-11 Implementation emergency preparedness and Slope Stabilization Selection response SL-MOFED-156766-CS-QCBS / Supervision services during Component 1: Rehabilitation Consultant the construction phase of the Under IDA / D2750 of Public Infrastructure and Post Qualification Open - National 60,000.00 0.00 2020-03-23 2020-03-29 2020-04-13 2020-04-10 2020-05-27 2020-06-26 2020-07-31 2021-01-27 Babadorie water reservoir Implementation Slope Stabilization Selection treatment plant and water supply system INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOFED-61762-CS-QCBS / Consultancy service to undertake Feasibility Study of Component 1: Rehabilitation the Babadorie water Supply IDA / D2750 of Public Infrastructure and Post Direct Selection Direct 150,000.00 0.00 Canceled 2018-05-15 2018-05-15 2018-05-25 2018-06-06 2018-07-29 2019-01-25 System including Safeguard Slope Stabilization instructments as detailed in the terms of reference SL-MOFED-69525-CS-INDV / Hire a consultant to prepare a Individual Project Procurement Strategy Component 3: Project Under IDA / D2750 Post Consultant Limited 20,000.00 0.00 2018-07-13 2018-07-17 2018-07-18 2018-07-20 2018-08-08 2018-10-13 2018-09-12 2019-03-11 for Development for the Management Implementation Selection Freetown Emergency Response Project SL-MOFED-69533-CS-INDV / Recruitment of an Individual Component 3: Project Under Environmental Safaguards IDA / D2750 Post Consultant Open 18,000.00 0.00 2018-07-17 2018-07-19 2018-09-04 2018-11-04 2018-09-25 2019-01-04 2018-10-30 2019-04-28 Management Implementation Specialist for the Freetown Selection Emergency Response Project SL-MOFED-69528-CS-INDV / Individual Recruitment of a Project Component 3: Project Under IDA / D2750 Post Consultant Open 24,000.00 0.00 2018-07-17 2018-07-19 2018-09-04 2018-07-27 2018-09-25 2018-08-21 2018-10-30 2019-04-28 Coordinator in the Freetown Management Implementation Selection Emergency Response Project SL-MOFED-69530-CS-INDV / Individual Recritment of a Project Civil Component 3: Project Under IDA / D2750 Post Consultant Open 18,000.00 0.00 2018-07-17 2018-07-19 2018-09-04 2018-11-04 2018-09-25 2019-01-04 2018-10-30 2019-04-28 Engineer for the Freetown Management Implementation Selection Emergency Response Project SL-MOFED-69531-CS-INDV / Recruitment of a M&E and Individual Component 3: Project Under Contract Management IDA / D2750 Post Consultant Open 18,000.00 0.00 2018-07-17 2018-07-19 2018-09-04 2018-11-04 2018-09-25 2019-01-04 2018-10-30 2019-04-28 Management Implementation Specialist for the Freetown Selection Emergency Response Project SL-MOFED-69535-CS-INDV / Recruitment of a Community Individual Engagement and Component 3: Project Under IDA / D2750 Post Consultant Open 8,000.00 0.00 2018-07-17 2018-07-19 2018-09-04 2018-11-08 2018-09-25 2019-01-04 2018-10-30 2019-04-28 Communication Specialist for Management Implementation Selection the Freetown Emergency response Project SL-MOFED-70272-CS-CDS / Hiring of a short term Safeguards Consultant to Component 3: Project IDA / D2750 Post Direct Selection Direct 18,280.00 0.00 Canceled 2018-07-20 2018-07-20 2018-07-30 2018-07-19 2018-10-03 2019-04-01 support GoSL on the recent Management resettlement exercise at Mortormeh SL-MOFED-98009-CS-CDS / Hiring of a short term Component 1: Rehabilitation Safeguards Consultant to Pending IDA / D2750 of Public Infrastructure and Post Direct Selection Direct 18,280.00 0.00 2018-07-20 2018-07-30 2018-10-03 2019-04-01 support GoSL on the recent Implementation Slope Stabilization resettlement exercise at Mortormeh SL-MOFED-61762-CS-CDS / Consultancy service to undertake Feasibility Study of Component 1: Rehabilitation the Babadorie water Supply IDA / D2750 of Public Infrastructure and Prior Direct Selection Direct 150,000.00 0.00 Under Review 2019-03-26 2019-04-05 2019-06-09 2019-12-06 System including Safeguard Slope Stabilization instructments as detailed in the terms of reference Page 2 SL-MOFED-124355-CS-INDV / Consultancy Service to Individual Component 2: Strengthening support review and update of IDA / D2750 Post Consultant Open 50,000.00 55,000.00 Signed 2019-07-26 2019-12-10 2019-09-13 2020-07-03 2019-10-04 2020-07-07 2019-11-08 2020-08-04 2020-05-06 institutional capacity the development of the DRM Selection Policy framework SL-MOFED-127523-CS-INDV Individual Component 2: Strengthening Under / Recruitment of a Consultant IDA / D2750 Post Consultant Open 20,000.00 0.00 2019-08-25 2019-08-25 2019-10-13 2019-11-03 2019-12-08 2020-06-05 institutional capacity Implementation to support ONS/DMD Selection SL-MOFED-150598-CS-INDV Individual / Consultancy Services to Hire Component 2: Strengthening Pending IDA / D2750 Post Consultant Open 20,000.00 0.00 2020-01-08 2020-02-26 2020-03-18 2020-04-22 2020-10-19 a Disaster Risk Management institutional capacity Implementation Selection Consultant SL-MOFED-179579-CS-INDV / Development of a Multi- Individual Hazard National Emergency Component 2: Strengthening IDA / D2750 Post Consultant Open 90,180.00 46,626.25 Signed 2020-06-11 2020-09-02 2020-07-30 2021-03-02 2020-08-20 2021-03-10 2020-09-24 2021-03-16 2021-03-23 Response Plan and Sub-plans institutional capacity Selection for Three Regional Disaster Management Hubs SL-MOFED-180108-CS-INDV Individual Component 3: Project Pending / The hiring of Property IDA / D2750 Post Consultant Open 15,000.00 0.00 2020-06-15 2020-08-03 2020-08-24 2020-09-28 2021-03-27 Management Implementation Valuer for the Mortomeh Selection SL-MOFED-181097-CS-CDS Component 2: Strengthening Under IDA / D2750 Post Direct Selection Direct 14,000.00 0.00 2020-06-22 2021-01-29 2020-07-02 2020-09-05 2021-03-04 / MCH consultant institutional capacity Implementation SL-MOFED-225294-CS-INDV Individual / Conducting a Project Impact Component 3: Project Under IDA / D2750 Post Consultant Limited 25,000.00 24,550.00 2021-04-02 2021-04-07 2021-04-07 2021-04-15 2021-04-28 2021-04-19 2021-06-02 2021-11-29 evaluation and Community Management Implementation Selection Perception Survey Page 3 PROCUREMENT PLAN Project information: URUGUAY – P159771 – Providing Quality Education in Uruguay Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT Uruguay : Improving the Quality of Initial and Primary Education in Uruguay PLAN General Information Country: Uruguay Bank’s Approval Date of the Original Procurement Plan: 2017-05-11 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159771 GPN Date: Project Name: Improving the Quality of Initial and Primary Education in Uruguay Loan / Credit No: IBRD / 86750 National administration of Public Education Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents as Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned UY-ANEP-14468-CW-RFB ESC RIVERA 2017 / Refacción Single Stage - One 2017-09- 2017-09- 2017-10- 2017-10- 2018-01- 2019-01- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 0.00 Canceled y Rehabilitación en Escuela - Envelope 01 01 02 12 20 15 Departamento de Rivera UY-ANEP-14484-CW-RFB ESC87 PAYSANDU 2017 / Single Stage - One 1,637,706.8 2017-01- 2017-01- 2017-01- 2017-02- 2017-02- 2017-03- 2017-03- 2017-07- 2017-06- 2018-07- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed Obra Refacción y Envelope 9 13 13 13 15 23 15 15 07 29 01 Rehabilitación Esc 87 Dep de Paysandú UY-ANEP-14560-CW-RFB- ESC-16-TYTRES 2017 / Obras Single Stage - One 1,117,654.6 2017-03- 2017-03- 2017-03- 2017-05- 2017-05- 2017-05- 2017-10- 2017-08- 2017-10- 2018-05- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed en Escuela - Departamento de Envelope 9 27 27 31 12 12 19 27 31 27 31 Treinta y Tres UY-ANEP-14469-CW-RFB ESC 160 MDEO 2017 / Single Stage - One 2017-06- 2017-06- 2017-06- 2017-07- 2017-08- 2017-08- 2017-08- 2017-11- 2017-11- 2018-11- IBRD / 86750 Early Education Post Request for Bids Open - National 530,000.00 918,830.08 Signed Refacción y Rehabilitación Envelope 15 29 26 27 10 06 22 14 15 09 Escuela 160 Montevideo UY-ANEP-14486-CW-RFB ESC 8 FLORIDA 2017 / Obra Single Stage - One 1,211,792.7 2017-03- 2017-03- 2017-03- 2017-05- 2017-05- 2017-05- 2017-05- 2017-08- 2017-09- 2018-05- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed Nueva, REfacción y Ampliación Envelope 9 27 27 31 12 12 19 15 31 06 31 Esc 8 Dep. de Florida UY-ANEP-17779-CW-RFB- ESC 11 SALTO / Obra Single Stage - One 1,256,108.9 2017-06- 2017-06- 2017-06- 2017-07- 2017-08- 2017-08- 2017-08- 2017-11- 2017-11- 2018-11- refacción y rehabiliatación IBRD / 86750 Early Education Post Request for Bids Open - National 1,200,000.00 Signed Envelope 6 20 29 26 26 03 04 18 30 16 30 Escuela N° 11 Salto, Departamento de Salto UY-ANEP-17781-CW-RFB-8 FRAILE MUERTO / Obra Refacción y Rehabilitación Single Stage - One 1,203,959.2 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- 2017-08- 2017-11- 2017-11- 2018-10- IBRD / 86750 Early Education Post Request for Bids Open - National 1,200,000.00 Signed Escuela N° 8 Fraile Muerto, Envelope 1 20 21 26 26 26 04 02 30 15 01 Melo, Departamento de Cerro Largo. UY-ANEP-17782-CW-RFB- 124 MELILLA / Obra de Single Stage - One 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- 2017-08- 2017-11- 2017-10- 2018-06- Refacción y Rehabilitación IBRD / 86750 Early Education Post Request for Bids Open - National 800,000.00 795,495.80 Signed Envelope 20 22 26 26 26 04 14 30 23 29 Escuela N° 124 Melilla, Departamento de Montevideo. UY-ANEP-17923-CW-RFB- ESC 39 MERCEDES / Obra en Single Stage - One 1,425,178.3 2015-06- 2015-06- 2015-06- 2015-07- 2015-07- 2015-07- 2015-07- 2015-11- 2015-11- 2017-07- IBRD / 86750 Early Education Post Request for Bids Open - National 357,961.38 Signed Escuela N° 39 Mercedes Envelope 5 14 11 14 20 20 24 24 03 05 31 Departamento de Soriano UY-ANEP-17918-CW-RFB- ESC 44 MDEO / Obra en Single Stage - One 2016-03- 2016-03- 2016-03- 2016-05- 2016-05- 2016-05- 2018-05- 2016-12- 2016-12- 2017-12- IBRD / 86750 Early Education Post Request for Bids Open - National 470,274.41 853,981.17 Signed Escuela N° 44 Departamento Envelope 31 31 31 03 03 10 10 23 23 31 Montevideo UY-ANEP-17917-CW-RFB- ESC 385 MARACANA / Obra Single Stage - One 1,156,827.1 2016-08- 2016-08- 2016-08- 2016-09- 2016-09- 2016-09- 2016-09- 2017-02- 2017-02- 2017-12- en Escuela N° 385 Barrio IBRD / 86750 Early Education Post Request for Bids Open - National 817,953.59 Signed Envelope 5 08 08 08 09 09 19 19 23 24 31 Maracana Departamento Montevideo UY-ANEP-17789-CW-RFB ESC 24 VICHADER0 / Obra en Single Stage - One 2016-08- 2016-08- 2016-08- 2016-09- 2016-09- 2016-09- 2016-09- 2017-02- 2017-02- 2017-07- IBRD / 86750 Early Education Post Request for Bids Open - National 446,174.48 519,247.43 Signed Escuela N° 24 Vichadero Envelope 01 01 01 12 12 27 27 15 15 31 Departamento Rivera UY-ANEP-17922-CW-RFB- 130 COLONIA / Obra en Single Stage - One 1,092,332.8 2015-06- 2015-06- 2015-06- 2015-07- 2015-07- 2015-07- 2015-07- 2016-02- 2016-02- 2017-06- IBRD / 86750 Early Education Post Request for Bids Open - National 67,330.59 Signed Escuela N° 130 Colonia, Envelope 0 17 17 21 22 22 31 31 24 24 30 Departamento de Colonia UY-ANEP-17921-CW-RFB- ESC 122 CARAGUATA / Obra Single Stage - One 1,176,404.1 2015-07- 2015-07- 2015-07- 2015-08- 2015-08- 2015-08- 2015-08- 2016-02- 2016-02- 2017-06- en Escuela N° 122 Toscas IBRD / 86750 Early Education Post Request for Bids Open - National 110,459.28 Signed Envelope 6 01 01 05 05 05 18 18 24 24 30 Caraguatá, Departamento Tacuarembó UY-ANEP-17919-CW-RFB- ESC 154 PENAROL / Obra en Single Stage - One 1,157,239.9 2015-07- 2015-07- 2015-07- 2015-08- 2015-08- 2015-11- 2015-11- 2016-03- 2016-03- 2017-06- IBRD / 86750 Early Education Post Request for Bids Open - National 57,439.21 Signed Escuela N° 154 Barrio Peñarol Envelope 5 08 08 12 12 12 27 27 29 29 30 Departamento Montevideo UY-ANEP-14465-CW-RFB - ESC 17 MALDONADO / Single Stage - One 2017-06- 2017-06- 2017-07- 2017-07- 2017-10- 2018-10- Refacción y Rehabilitación IBRD / 86750 Early Education Post Request for Bids Open - National 921,000.00 0.00 Canceled Envelope 01 01 02 12 20 15 Escuela 17 Gregorio Aznares Departamento Maldonado UY-ANEP-14470-CW-RFB ESC LAS PIEDRAS2017 / Single Stage - One 2017-08- 2017-08- 2017-09- 2017-09- 2017-12- 2018-12- Rehabilitación y Refacción IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 0.00 Canceled Envelope 01 01 01 11 20 15 Escuela Las Piedras, Departamento de Canelones UY-ANEP-14467-CW-RFB ESC SAN JOSE 2017 / Single Stage - One 2017-09- 2017-09- 2017-10- 2017-10- 2018-01- 2019-01- Refacción y Rehabilitación IBRD / 86750 Early Education Post Request for Bids Open - National 2,000,000.00 0.00 Canceled Envelope 01 05 06 16 24 19 Escuela - Departamento de San Jose UY-ANEP-71639-CW-RFB- ESC 117 MDEO / Obra nueva y Single Stage - One 1,344,266.8 2018-08- 2018-07- 2018-08- 2018-09- 2018-09- 2018-09- 2018-09- 2018-12- 2019-02- 2019-09- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed refacción Escuela N°117 de Envelope 4 01 30 01 06 06 16 18 21 01 16 Montevideo UY-ANEP-71670-CW-RFB- ESC 65 MEDEO / Ampliación y Single Stage - One 2018-08- 2018-08- 2018-09- 2018-09- 2018-12- 2019-07- IBRD / 86750 Early Education Post Request for Bids Open - National 900,000.00 0.00 Canceled Refacción Escuela 65 Envelope 15 15 20 30 28 28 Montevideo UY-ANEP-88457-CW-RFQ- OBRA ESC 35 BUCEO / Reforma de dos baños, realización accesos discapacitados, Request for Single Stage - One 2019-01- 2019-03- 2019-06- 2019-05- IBRD / 86750 Early Education Post Open - National 180,000.00 205,377.85 Signed reforma integral de Quotations Envelope 07 06 20 31 instalación eléctrica, realización de instalación de gas para conectar gas natural, pintura interior de escuela, reparaciones varias instalación sanitaria. UY-ANEP-96774-CW-RFQ- ESC105-LACAZE 2019 / Request for Single Stage - One 2019-02- 2019-03- 2019-06- 2019-05- IBRD / 86750 Early Education Post Open - National 100,000.00 153,394.79 Signed Ampliacion y reforma Esc. 105 Quotations Envelope 14 25 12 04 Juan Lacaze, Colonia UY-ANEP-99825-CW-RFB- ESC 184 MDEO 2019 / Reforma y ampliación de dos Single Stage - One 2019-02- 2019-03- 2019-04- 2019-04- 2019-07- 2020-02- IBRD / 86750 Early Education Post Request for Bids Open - National 350,000.00 0.00 Canceled aulas nuevas, SSHH y espacios Envelope 28 04 03 10 10 09 exteriores en Escuela N° 184 Barrio Lavalleja, Montevideo Page 1 UY-ANEP-99829-CW-RFB- ESC 326 MDEO 2019 / Reforma y ampliación de aulas Single Stage - One 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2020-11- IBRD / 86750 Early Education Post Request for Bids Open - National 350,000.00 0.00 Canceled SSHH, dirección y sala de Envelope 27 01 31 07 06 06 maestros en Escuela N° 326 Nuevo Ellauri, Montevideo UY-ANEP-99838-CW-RFQ- ESC 111SORIANO 2019 / Rehabilitación general de la Request for Single Stage - One 2019-02- 2019-04- 2019-08- IBRD / 86750 Early Education Post Open - National 95,000.00 0.00 Canceled eléctrica y Refacción cocina de Quotations Envelope 27 23 23 la Escuela N° 111 Mercedes, Soriano. UY-ANEP-99840-CW-RFQ- ESC 44 MALDON 2019 / Reforma y ampliación cocina, Request for Single Stage - One 2019-02- 2019-04- 2019-09- IBRD / 86750 Early Education Post Open - National 55,000.00 0.00 Canceled SSHH y espacios exteriores en Quotations Envelope 26 22 23 Escuela N° 44 Rincón de Olivera, Maldonado UY-ANEP-99843-CW-RFQ- ESC 60 MDEO 2019 / Rehabilitación SSHH de Request for Single Stage - One 2019-02- 2019-04- 2019-09- 2019-08- preescolares e IBRD / 86750 Early Education Post Open - National 100,000.00 146,751.51 Signed Quotations Envelope 18 10 02 12 impermeabilización general de azoteas en Escuela N° 60 Solferino, Montevideo UY-ANEP-99844-CW-RFQ- ESC 267 MDEO 2019 / Reforma y rehabilitación de Request for Single Stage - One 2019-02- 2019-04- 2019-08- IBRD / 86750 Early Education Post Open - National 180,000.00 0.00 Canceled cocina, comedor, SSHH y aulas Quotations Envelope 25 17 19 en Escuela N° 267 Euskalerría, Montevideo UY-ANEP-99845-CW-RFQ- ESC 35 DURAZNO 2019 / Impermeabilización de Request for Single Stage - One 2019-03- 2019-05- 2019-08- IBRD / 86750 Early Education Post Open - National 65,000.00 0.00 Canceled azotea, cambio de pisos y Quotations Envelope 08 03 05 sellado de aberturas en Escuela N°35 Sandú, Durazno. UY-ANEP-99842-CW-RFB- ESC 2 RIONEGRO 2019 / Reforma y ampliación dos Single Stage - One 2019-04- 2019-05- 2019-06- 2019-06- 2019-09- 2020-02- aulas nuevas, cocina, IBRD / 86750 Early Education Post Request for Bids Open - National 650,000.00 0.00 Canceled Envelope 29 03 02 09 08 10 comedor, SSHH y espacios exteriores en Escuela N° 2 Río Negro, Fray Bentos UY-ANEP-99834-CW-RFB- ESC 6 TACREMBO 2019 / Reforma y ampliación de aulas nuevas, dirección, sala de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-09- 2019-12- 2020-06- IBRD / 86750 Early Education Post Request for Bids Open - National 900,000.00 0.00 Canceled maestros y espacios Envelope 30 03 02 09 09 10 exteriores en Escuela N° 6 Ciudad de Tacuarembó Departamento de Tacuarembó UY-ANEP-105805-CW-RFB- OBRA IFS 2019 / Obra de reforma y adecuación local existente para IFS : 2 aulas magnas para 100 personas Single Stage - One 1,188,073.1 2019-03- 2019-05- 2019-03- 2019-04- 2019-06- 2019-04- 2019-07- 2019-07- 2019-11- 2020-01- IBRD / 86750 Early Education Post Request for Bids Open - National 1,750,000.00 Signed c/u, administración, Envelope 1 13 17 25 25 28 29 19 29 20 25 Dirección, Coordinación operativa, Secretaría, 8 oficinas, Comedor, Bibliteca, SSHH a nuevo. UY-ANEP-107930-CW-RFB- 142-MONTEVIDEO / Reforma Single Stage - One 1,397,846.3 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-06- 2019-08- 2019-09- 2020-06- IBRD / 86750 Early Education Post Request for Bids Open - National 1,800,000.00 Signed y Ampliación, cocina, Envelope 9 27 23 01 02 24 12 10 09 12 08 comedor, SSHH y aulas UY-ANEP-118368-CW-RFB- ESC 184 MDEO 2019 / Obra nueva, refacción y ampliación Single Stage - One 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-08- 2019-11- 2019-11- 2020-08- IBRD / 86750 Early Education Post Request for Bids Open - National 451,000.00 672,961.02 Signed en la Escuela N° 184 Barrio Envelope 28 20 28 29 24 05 08 04 20 30 Lavalleja, Departamento de Montevideo UY-ANEP-119213-CW-RFQ- ESC 20 MDEO 2019 / Obras Request for Single Stage - One 2019-07- 2019-09- 2019-09- 2019-11- IBRD / 86750 Early Education Post Open - National 140,000.00 152,424.60 Signed de ampliación de la cocina de Quotations Envelope 15 12 30 11 la Escuela N° 20 Montevideo UY-ANEP-121366-CW-RFQ- ESC 117 SAN RAMON / Re- adecuación baños existentes, Request for Single Stage - One 2019-07- 2019-09- 2019-11- 2019-11- construcción baños nuevos IBRD / 86750 Early Education Post Open - National 80,000.00 77,872.23 Signed Quotations Envelope 15 13 13 12 para Educación Inicial, acondicionamiento del sistema de saneamiento UY-ANEP-99836-CW-RFB- ESC 124 TMBO 2019 / Reforma cocina, comedor, Single Stage - One 1,253,596.2 2019-07- 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2019-09- 2019-12- 2020-02- 2020-06- aulas y espacios exteriores en IBRD / 86750 Early Education Post Request for Bids Open - National 1,200,000.00 Signed Envelope 4 29 05 02 01 04 08 30 08 14 09 Escuela N° 124 Ciudad de Tacuarembó, Departamento de Tacuarembó UY-ANEP-99811-CW-RFB- ESC 65 MDEO 2019 / Reforma y ampliación de aulas, SSHH y Single Stage - One 1,243,966.4 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2019-10- 2020-01- 2020-02- 2020-11- IBRD / 86750 Early Education Post Request for Bids Open - National 1,400,000.00 Signed espacios exteriores en Escuela Envelope 4 18 26 23 22 26 04 14 10 14 06 N° 65 Ciudad Vieja Montevideo UY-ANEP-128557-CW-RFQ- 111 SORIANO 2019 / Ampliación, reforma, Request for Single Stage - One 2019-08- 2019-10- 2020-02- 2020-01- acondicionamiento sanitario y IBRD / 86750 Early Education Post Open - National 130,000.00 222,747.32 Signed Quotations Envelope 30 22 10 20 eléctrico en Escuela N° 111 Mercedes, Departamento de Soriano UY-ANEP-151242-CW-DIR- ESC CHINA 201 / Trabajos exigidos por la Intendencia Municipal de Montevideo 2020-01- 2019-12- 2020-01- 2019-12- 2020-02- 2020-02- 2020-04- referidos a la extensión del IBRD / 86750 Early Education Post Direct Selection Direct 110,000.00 117,003.22 Signed 22 18 29 16 14 13 14 colector existente en la obra Escuela nueva de Tiempo Completo N° 304 República Popular de China. UY-ANEP-156549-CW-RFQ- ESC 4 MONTEVIDEO / Reforma Request for Single Stage - One 2020-02- 2020-04- 2020-06- 2020-05- batería de baños y sector IBRD / 86750 Early Education Post Open - National 110,000.00 76,735.23 Signed Quotations Envelope 06 03 01 22 Administración en Escuela N° 4 de Montevideo. UY-ANEP-99819-CW-RFB- ESC 98 SORIANO 2019 / Obra Single Stage - One 1,713,090.4 2019-05- 2020-05- 2019-06- 2019-07- 2020-07- 2019-07- 2020-08- 2019-10- 2021-03- 2020-10- IBRD / 86750 Early Education Post Request for Bids Open - National 1,200,000.00 Signed nueva Escuela N° 98 Envelope 7 29 20 03 03 02 10 05 09 15 09 Mercedes, Soriano UY-ANEP-157310-CW-RFB- ESC 267 MDEO 2020 / Obra Single Stage - One 2020-04- 2020-07- 2020-04- 2020-05- 2020-08- 2020-05- 2020-09- 2020-08- 2021-04- 2021-04- rehabilitación en Escuela 267 IBRD / 86750 Early Education Post Request for Bids Open - National 800,000.00 545,514.43 Signed Envelope 02 24 06 06 28 13 22 12 15 12 Barrio Malvín Norte Departamento de Montevideo UY-ANEP-185650-CW-RFB- 5 RIO BRANCO 2020 / Rehabilitación y acondicionamiento local Single Stage - One 2020-07- 2020-08- 2020-09- 2020-09- 2020-12- 2021-04- IBRD / 86750 Early Education Post Request for Bids Open - National 250,000.00 0.00 Canceled escolar Escuela 5 de Río Envelope 31 04 03 10 10 12 Branco, incluye re ubicación cocina, reforma baños, adecuación aulas. UY-ANEP-157309-CW-RFQ- Under ESC 5 FLORIDA 2020 / Obra Request for Single Stage - One 2021-04- 2021-06- 2021-09- IBRD / 86750 Early Education Post Open - National 105,000.00 0.00 Implementat de Rehabilitación en Escuela 5 Quotations Envelope 01 25 23 ion Florida, Departamento Florida Page 2 UY-ANEP-157313-CW-RFB- ESC 320 MDEO 2020 / Obra Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-12- 2021-08- IBRD / 86750 Early Education Post Request for Bids Open - National 800,000.00 0.00 Canceled de rehabilitación en Escuela Envelope 03 07 06 13 13 13 N° 320 Casavalle, Montevideo UY-ANEP-99822-CW-RFB- ESC 129 MDEO 2019 / Obra Single Stage - One 2019-04- 2019-05- 2019-06- 2019-06- 2019-09- 2020-04- de ampliación y refacción en IBRD / 86750 Early Education Post Request for Bids Open - National 1,100,000.00 0.00 Canceled Envelope 29 03 02 09 08 09 Escuela N° 129 Hipódromo, Montevideo UY-ANEP-157311-CW-RFB- ESC301 MARIND 2020 / Obra Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-12- 2021-09- de ampliación en Escuela N° IBRD / 86750 Early Education Post Request for Bids Open - National 1,100,000.00 0.00 Canceled Envelope 03 07 06 13 13 13 301 Marindia, Departamento Canelones UY-ANEP-157306-CW-RFB- ESC 9 LA TEJA 2020 / Obra de Pending Single Stage - One 2021-04- 2021-04- 2021-05- 2021-05- 2021-08- 2022-05- rehabilitación en Escuela 9 La IBRD / 86750 Early Education Post Request for Bids Open - National 1,300,000.00 0.00 Implementat Envelope 02 06 06 13 06 25 Teja, Departamento de ion Montevideo UY-ANEP-218440-CW-RFB- ESC 4 MONTEVIDEO / Pending Rehabilitación general del Single Stage - One 2021-03- 2021-04- 2021-05- 2021-05- 2021-08- 2022-02- IBRD / 86750 Early Education Post Request for Bids Open - National 466,000.00 0.00 Implementat edificio, ampliación comedor, Envelope 31 05 05 12 31 28 ion reforma cocina y sshh y acceso para discapacitados. UY-ANEP-218438-CW-RFB- ESC 131 MONTEVIDEO / Pending Single Stage - One 2021-03- 2021-03- 2021-04- 2021-04- 2021-08- 2022-05- Ampliación dos aulas, IBRD / 86750 Early Education Post Request for Bids Open - National 698,000.00 0.00 Implementat Envelope 01 06 05 12 01 28 rehabilitación general y ion acondicionamiento de patio UY-ANEP-234351-CW-RFQ Request for Pending ESC. 4 DE ROCHA / Request for Single Stage - One 2021-06- 2021-07- 2021-12- IBRD / 86750 Early Education Post Open - National Quotations (Non 220,000.00 0.00 Implementat Ampliación. Un aula, mas Quotations Envelope 06 30 31 Bank-SPD) ion comedor y cocina. UY-ANEP-234355-CW-RFQ ESC. 63 LAVALLEJA / Request for Under Request for Single Stage - One 2021-06- 2021-07- 2021-12- Ampliación. Dentro de la IBRD / 86750 Early Education Post Open - National Quotations (Non 220,000.00 0.00 Implementat Quotations Envelope 06 30 29 construcción existente, en el Bank-SPD) ion área de comedor y cocina. UY-ANEP-234354-CW-RFQ ESC. 36 DE ARTIGAS / Request for Pending Request for Single Stage - One 2021-06- 2021-07- 2021-12- Ampliación. Dentro de la IBRD / 86750 Early Education Post Open - National Quotations (Non 220,000.00 0.00 Implementat Quotations Envelope 06 31 17 construcción existente en el Bank-SPD) ion área de comedor y cocina. GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents as Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UY-ANEP-14475-GO-RFQ Request for Single Stage - One 2017-08- 2017-09- 2017-09- 2017-11- CORTINAS 2017 / Cortinas, IBRD / 86750 Primary Education Post Open - National 8,800.00 16,976.28 Signed Quotations Envelope 23 15 18 01 Alfombras y colchonetas UY-ANEP-14485-GO-RFQ FOTOCOPIAS 2017 / 80.000 Request for Single Stage - One 2017-03- 2017-03- 2017-03- 2017-12- IBRD / 86750 Primary Education Post Open - National 1,220.00 1,081.87 Signed Fotocopias para Formación en Quotations Envelope 16 29 29 31 Servicio año 2017 UY-ANEP-14488-GO-RFQ ESCURRIDORES 2017 / 30 Request for Single Stage - One 2017-05- 2017-06- 2017-05- 2017-07- IBRD / 86750 Primary Education Post Open - National 24,000.00 630.86 Signed escurridores de acero Quotations Envelope 17 02 29 05 inoxidable UY-ANEP-14573-GO-RFQ- COL ANDARIEGA 2017 / 21 Request for Single Stage - One 2017-05- 2017-05- 2017-10- 2017-06- IBRD / 86750 Primary Education Post Open - National 30,000.00 10,186.37 Signed Bibliotecas y carros para Quotations Envelope 17 31 02 14 almohadones UY-ANEP-14717-GO-RFQ- LIBROS TECNICO 2017 / Libros Técnicos para los Request for Single Stage - One 2017-05- 2017-06- 2017-03- 2017-08- IBRD / 86750 Primary Education Post Open - National 3,500.00 1,571.18 Signed Equipos de Cultura Quotations Envelope 22 15 30 14 Institucional, Matemáticas y Ciencias Sociales UY-ANEP-14476-GO-RFB EQ Single Stage - One 2017-07- 2017-08- 2017-07- 2017-08- 2017-09- 2017-08- 2017-09- 2017-09- 2017-12- 2017-11- SEMI IND 2017 / IBRD / 86750 Primary Education Post Request for Bids Open - National 230,000.00 250,222.00 Signed Envelope 07 01 12 14 01 24 26 04 06 15 Equipamiento Semi Industrial UY-ANEP-14481-GO-RFB MOB DIRECCION 2017 / Single Stage - One 2017-07- 2017-08- 2017-07- 2017-08- 2017-09- 2017-08- 2017-09- 2017-09- 2017-12- 2017-11- IBRD / 86750 Primary Education Post Request for Bids Open - National 100,000.00 115,457.79 Signed Mobiliario Dirección y Sala de Envelope 03 01 08 07 01 17 26 18 04 15 Maestros ETC UY-ANEP-14479-GO-RFB Single Stage - One 2017-05- 2017-06- 2017-05- 2017-06- 2017-07- 2017-07- 2017-07- 2017-10- 2017-11- 2018-01- MOB ESCOLAR 2017 / IBRD / 86750 Primary Education Post Request for Bids Open - National 550,000.00 608,157.10 Signed Envelope 17 01 26 26 03 06 21 16 29 14 Mobiliario Escolar UY-ANEP-14483-GO-RFB Single Stage - One 2017-02- 2017-02- 2017-02- 2017-03- 2017-03- 2017-04- 2017-04- 2017-07- 2017-06- 2017-08- VAJILLA 2017 / Vajila y IBRD / 86750 Early Education Post Request for Bids Open - National 100,000.00 72,641.23 Signed Envelope 09 09 09 13 13 03 03 13 30 27 Utensilios para cocina UY-ANEP-14477-GO-RFB EQ Single Stage - One 2017-07- 2017-10- 2017-07- 2017-08- 2017-10- 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- INFORM 2017 / Equipamiento IBRD / 86750 Primary Education Post Request for Bids Open - National 60,000.00 42,308.80 Signed Envelope 18 27 23 23 27 04 14 05 22 31 Informático UY-ANEP-14804-GO-RFB- PLATOS ETC 2017 / Platos Single Stage - One 2017-05- 2017-06- 2017-05- 2017-06- 2017-07- 2017-06- 2017-07- 2017-07- 2017-09- 2017-10- IBRD / 86750 Early Education Post Request for Bids Open - National 96,000.00 74,233.28 Signed hondos 15.000 y Platos llanos Envelope 12 13 15 14 13 19 24 03 06 02 8.000 para ETC UY-ANEP-17152-GO-RFQ / Material fotocopiado en formato de libro para Request for Single Stage - One 2017-06- 2017-07- 2017-06- 2018-01- capacitación ETC que se IBRD / 86750 Primary Education Post Open - National 1,500.00 1,550.01 Signed Quotations Envelope 19 03 27 07 entregan mensualmente a Formadores de junio a diciembre (15 por mes) UY-ANEP-17783-GO-RFQ- LIBROS-COL-ANDARIEG / Request for Single Stage - One 2017-06- 2017-07- 2017-07- 2017-08- IBRD / 86750 Early Education Post Open - National 42,000.00 32,331.15 Signed LIBROS PARA LA COLECCIÓN Quotations Envelope 24 14 06 14 ANDARIEGA (DLI) UY-ANEP-14480-GO-RFQ EQ Request for Single Stage - One 2017-07- 2017-08- 2017-09- 2017-10- AUDIOVISUAL 2017 / IBRD / 86750 Primary Education Post Open - National 23,000.00 23,423.50 Signed Quotations Envelope 24 16 05 16 Equipamiento Audiovisual UY-ANEP-30193-GO-DIR- LIBROS COL ANDARIEG / CD. 2017-09- 2017-09- 2017-10- 2017-10- IBRD / 86750 Early Education Post Direct Selection Direct 3,800.00 0.00 Canceled LIBROS COLECCIÓN 26 29 04 20 ANDARIEGA UY-ANEP-31180-GO-RFQ LIBROS II / Complemento Request for Single Stage - One 2017-10- 2017-10- 2017-10- 2017-11- IBRD / 86750 Early Education Post Open - National 3,800.00 3,084.72 Signed Libros de la Colección Quotations Envelope 12 20 20 30 "Andariega" (DLI) UY-ANEP-31207-GO-RFQ- PROYECTOR Y OTROS / Request for Single Stage - One 2017-10- 2017-11- 2017-11- 2017-12- IBRD / 86750 Primary Education Post Open - National 15,000.00 27,109.60 Signed Proyectores y pantallas para Quotations Envelope 16 07 28 08 Escuelas de Tiempo Completo UY-ANEP-36028-GO-DIR / 2017-11- 2017-11- 2017-11- 2017-12- Adquisición 20 Bibliotecas IBRD / 86750 Primary Education Prior Direct Selection Direct 12,000.00 0.00 Canceled 08 13 13 15 Andariegas Page 3 UY-ANEP-37562-GO-RFQ- CERTIFICADOS / Certificados Request for Single Stage - One 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- IBRD / 86750 Primary Education Post Open - National 2,000.00 985.66 Completed a entregar a Docentes Fines Quotations Envelope 24 30 01 05 08 de Cursos 2018 UY-ANEP-37564-GO-RFQ- LIBROS ANDARI 2018 / Libros Request for Single Stage - One 2017-11- 2017-12- 2017-12- 2018-02- Colección Andariega para IBRD / 86750 Early Education Post Open - National 42,000.00 34,662.17 Signed Quotations Envelope 24 12 07 15 2018 - 100 títulos con 20 ejemplares de cada uno. UY-ANEP-39537-GO-RFQ- FOTOCOPIAS DIC-JUL / 200.000 Fotocopias para los Request for Single Stage - One 2017-12- 2017-12- 2018-01- 2018-07- IBRD / 86750 Primary Education Post Open - National 8,300.00 3,168.33 Signed cursos de capacitación Quotations Envelope 13 21 04 31 docente desde diciembre 2017 a julio 2018 UY-ANEP-39545-GO-RFQ- MATERIAL E IMPRESOS / Request for Single Stage - One 2018-01- 2018-02- 2018-10- 2018-12- Materiales e impresiones IBRD / 86750 Primary Education Post Open - National 45,000.00 222.96 Signed Quotations Envelope 22 23 30 31 Formación en Servicio de Febrero a Diciembre 2018 UY-ANEP-39591-GO-RFB-EQ Single Stage - One 2018-08- 2018-08- 2018-09- 2018-09- 2018-11- 2018-12- SEMI IND 2018 / IBRD / 86750 Primary Education Post Request for Bids Open - National 192,000.00 0.00 Canceled Envelope 01 01 03 21 08 23 Electrodomésticos Industriales UY-ANEP-39594-GO-RFB- Single Stage - One 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-04- 2018-05- 2018-05- VAJILLA ALUM 2018 / Vajilla y IBRD / 86750 Early Education Post Request for Bids Open - National 150,000.00 152,430.84 Signed Envelope 09 24 12 13 23 28 12 16 07 31 Aluminio para ETC 2018 UY-ANEP-39598-GO-RFQ- ELECTROD 2018 / Request for Single Stage - One 2018-01- 2018-02- 2018-01- 2018-04- IBRD / 86750 Primary Education Post Open - National 43,000.00 39,963.78 Signed Electrodomésticos (heladeras Quotations Envelope 12 09 25 10 y freezer) 2018 para ETC UY-ANEP-41033-GO-RFQ- BIBLIOG FORM INICIA / Request for Single Stage - One 2018-01- 2018-01- 2018-01- 2018-02- Biografiara para Formadores IBRD / 86750 Early Education Post Open - National 1,000.00 1,191.17 Signed Quotations Envelope 08 22 19 08 de Educación Inicial - 27 Títulos UY-ANEP-63176-GO-RFQ- LIB ANDAR COMP 2018 / Request for Single Stage - One 2018-05- 2018-06- 2018-06- 2018-07- Complemento de títulos IBRD / 86750 Early Education Post Open - National 12,000.00 1,920.34 Signed Quotations Envelope 25 08 07 09 Colección Andariega (DLI) para 2018 UY-ANEP-63182-GO-RFB- CARROS COL AND 2018 / Single Stage - One 2018-05- 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2018-08- 2018-11- Adquisición de bibliotecas y IBRD / 86750 Primary Education Post Request for Bids Open - National 55,000.00 935,008.00 Signed Envelope 25 24 29 28 26 06 05 17 22 30 carros para colección andariega UY-ANEP-68136-GO-DIR- LIBROS C-A- 2018 / 2018-06- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- Complemento 9 Libros para IBRD / 86750 Early Education Post Direct Selection Direct 2,000.00 1,001.69 Signed 27 27 30 19 05 25 21 Biblioteca Colección Andariega UY-ANEP-79041-GO-RFQ- LIBROS COL AND 2019 / Libros para la Colección de Request for Single Stage - One 2018-10- 2018-10- 2018-06- 2019-02- IBRD / 86750 Early Education Post Open - National 40,000.00 1,654.17 Signed Carros Andariegos de Quotations Envelope 01 31 07 15 Educación Inicial a entregarse en febrero 2019 UY-ANEP-80467-GO-RFQ- Request for Single Stage - One 2018-10- 2018-11- 2018-12- 2018-12- ANAFES 2018 / 20 Anafes dos IBRD / 86750 Primary Education Post Open - National 26,000.00 25,620.00 Signed Quotations Envelope 10 06 13 21 fuegos a gas UY-ANEP-81645-GO-RFQ- ELECTROD-2018 / Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-12- 2019-02- Electrodomésticos semi IBRD / 86750 Primary Education Post Open - National 46,500.00 36,743.00 Completed Quotations Envelope 19 09 09 24 15 industrial (licuadoras- batidoras y procesadoras) UY-ANEP-88454-GO-RFQ- COMP LIBROS 2019 / Complemento Libros Colección Andariega 2019. Request for Single Stage - One 2018-12- 2018-12- 2018-12- 2019-02- IBRD / 86750 Early Education Post Open - National 18,000.00 5,866.14 Signed Títulos que quedaron Quotations Envelope 04 20 19 15 desiertos y nuevos títulos que complementan colecciones anteriores UY-ANEP-99854-GO-RFB- Single Stage - One 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-07- 2019-08- 2019-08- VAJILLA 2019 / Vajilla y IBRD / 86750 Early Education Post Request for Bids Open - National 98,000.00 77,280.72 Signed Envelope 20 19 20 19 23 02 28 03 08 17 06 utensilios de cocina UY-ANEP-99855-GO-RFB- MOB DIRECCION 2019 / Mobiliario de Dirección y Sala Single Stage - One 2019-06- 2019-10- 2019-06- 2019-07- 2019-10- 2019-07- 2019-11- 2019-08- 2019-12- 2019-11- IBRD / 86750 Early Education Post Request for Bids Open - National 65,000.00 63,027.64 Signed de Maestros (escritorios, Envelope 01 25 09 09 25 22 13 21 26 04 mesas, sillas, cajoneras, bibliotecas, etc) UY-ANEP-100302-GO-RFQ- MAT IMPRESOS 2019 / Materiales y Fotocopias del Request for Single Stage - One 2019-03- 2019-03- 2019-04- 2019-12- IBRD / 86750 Primary Education Post Open - National 24,000.00 1,599.10 Signed Componente Formación en Quotations Envelope 04 29 30 31 Servicio de Abril a Diciembre 2019 UY-ANEP-100308-GO-RFQ- PUBLICACIONES 2019 / Publicaciones para el Request for Single Stage - One 2019-03- 2019-03- 2019-12- IBRD / 86750 Primary Education Post Open - National 22,000.00 0.00 Canceled Componente Formación en Quotations Envelope 04 29 31 Servicio a realizarse entre ABRIL y DICIEMBRE 2019 UY-ANEP-99061-GO-DIR- COMP-LBROS 2019 / Libro 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- para la Colección Andariega IBRD / 86750 Early Education Post Direct Selection Direct 400.00 377.56 Signed 05 12 08 20 11 22 28 2019 - Cantidad 23 del mismo titulo. UY-ANEP-99851-GO-RFB- MOBILIARIO ESC 2019 / Mobiliario Escolar, mesas, sillas y bancos para salas de Single Stage - One 2019-02- 2019-03- 2019-02- 2019-03- 2019-04- 2019-04- 2019-05- 2019-07- 2019-10- 2019-10- IBRD / 86750 Early Education Post Request for Bids Open - National 620,000.00 450,504.00 Signed preescolares, escolares y Envelope 14 11 22 24 12 06 20 05 29 03 comedor. Total de aulas: Ed. Inicial 3, 4 y 5 años: 67, 1° a 3°: 75 y 4° a 6° 77 UY-ANEP-99852-GO-RFB- EQUIP SEMI IND 2019 / Equipamiento Semi Industrial: Single Stage - One 2019-03- 2019-05- 2019-03- 2019-04- 2019-06- 2019-04- 2019-06- 2019-05- 2019-08- 2019-08- 2019-10- 10 Anafes 1 fuego, 35 IBRD / 86750 Early Education Post Request for Bids Open - National 250,000.00 188,795.00 Completed Envelope 06 03 14 13 06 26 21 26 15 09 14 Cocinas con horno, 10 Horno Eléctrico con base y 30 Anafes 2 fuegos. UY-ANEP-109107-GO-RFQ- ESCURRIDORES 2019 / Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-06- Compra de 40 escurridores IBRD / 86750 Primary Education Post Open - National 26,600.00 19,520.00 Signed Quotations Envelope 29 26 20 25 industriales para cocina de las Escuelas de Tiempo Completo UY-ANEP-118343-GO-RFQ- CARROS ANDAR 2019 / Request for Single Stage - One 2019-06- 2019-07- 2019-07- 2019-09- Adquisición de 26 Bibliotecas IBRD / 86750 Primary Education Post Open - National 17,000.00 19,844.95 Signed Quotations Envelope 17 24 17 22 y 25 carros para Colección Andariega- año 2020 UY-ANEP-99849-GO-RFB- ELECTROD 2019 / Heladeras, Single Stage - One 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- IBRD / 86750 Early Education Post Request for Bids Open - National 150,000.00 132,771.80 Signed freezer y electrodomésticos Envelope 28 29 29 28 30 11 14 17 25 27 industriales Page 4 UY-ANEP-141781-GO-RFQ- LIBROS ANDAR 2019 / 2.300 Libros de Colección Andariega Request for Single Stage - One 2019-10- 2019-12- 2019-11- 2020-02- para armar 23 Bibliotecas con IBRD / 86750 Early Education Post Open - National 44,000.00 31,167.17 Signed Quotations Envelope 30 06 21 28 100 títulos cada una a entregar en Escuelas de Tiempo Completo 2020 UY-ANEP-141818-NC-RFQ- CAJAS LIBROS 2020 / 60 Cajas multiuso en PVC con tapa Request for Single Stage - One 2019-10- 2019-11- 2019-11- 2019-11- IBRD / 86750 Early Education Post Open - National 500.00 333.68 Signed para guardar y transportar Quotations Envelope 28 07 22 22 los libros de la colección Andariega UY-ANEP-143901-GO-DIR- BIBLIOTECAS 2017 / 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-11- 2017-12- IBRD / 86750 Primary Education Post Direct Selection Direct 12,000.00 7,666.93 Signed Adquisición 20 Bibliotecas 08 31 13 22 13 22 15 Andariegas UY-ANEP-141808-NC-RFQ- ETIQ LIBROS 2020 / Planchas de etiquetas auto adhesivas que poseen un número de Request for Single Stage - One 2019-10- 2019-11- 2019-11- IBRD / 86750 Early Education Post Open - National 1,800.00 0.00 Canceled referencia, para colocar en los Quotations Envelope 28 07 22 libros de la colección andariega, a distribuir en la ETC UY-ANEP-99847-GO-RFQ- ALFOMBRAS 2019 / Alfombras Request for Single Stage - One 2019-03- 2019-04- 2019-06- IBRD / 86750 Primary Education Post Open - National 17,000.00 0.00 Canceled y colchonetas para Educación Quotations Envelope 07 29 15 Inicial UY-ANEP-99848-GO-RFQ- EQ AUDIOVISUAL 2019 / Request for Single Stage - One 2019-05- 2019-06- 2019-08- Combo parlantes activos, IBRD / 86750 Primary Education Post Open - National 16,500.00 0.00 Canceled Quotations Envelope 07 09 15 radiograbadores y equipamiento audiovisual UY-ANEP-156960-GO-RFB- MOB ESCOLAR 2020 / Under Single Stage - One 2020-04- 2021-02- 2020-04- 2020-05- 2021-03- 2020-05- 2021-04- 2020-08- 2020-12- Mobiliario Escolar e inicial IBRD / 86750 Early Education Post Request for Bids Open - National 700,000.00 0.00 Implementati Envelope 02 25 03 04 25 15 27 20 18 para 23 Escuelas de Tiempo on Completo UY-ANEP-156964-GO-RFB- Single Stage - One 2020-04- 2020-04- 2020-04- 2020-05- 2020-05- 2020-05- 2020-06- 2020-06- 2020-08- 2020-09- VAJILLA 2020 / Vajilla y IBRD / 86750 Early Education Post Request for Bids Open - National 145,000.00 90,448.20 Signed Envelope 02 21 02 04 25 20 03 26 03 24 Aluminio para ETC UY-ANEP-156969-GO-RFB- MOB MAESTROS 2020 / Single Stage - One 2020-05- 2020-08- 2020-05- 2020-06- 2020-09- 2020-06- 2020-12- 2020-07- 2021-01- 2020-10- IBRD / 86750 Early Education Post Request for Bids Open - National 190,000.00 53,794.00 Signed Mobiliario de Dirección y Sala Envelope 04 26 05 04 25 15 23 24 13 22 de Maestros de ETC UY-ANEP-156972-GO-RFB- ELECTRODOM 2020 / Single Stage - One 2020-06- 2020-08- 2020-06- 2020-07- 2020-09- 2020-07- 2020-09- 2020-10- 2020-12- 2020-12- IBRD / 86750 Early Education Post Request for Bids Open - National 370,000.00 191,601.00 Signed Electrodomésticos industriales Envelope 15 04 16 16 04 29 15 27 17 27 para ETC UY-ANEP-157785-GO-RFQ- FOTOCOPIAS 2020 / Fotocopias de material a entregar en los encuentros Monitoring and Evaluation Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-12- IBRD / 86750 Post Open - National 6,000.00 5,431.00 Signed docentes en el año 2020. System Quotations Envelope 10 25 27 30 Cantidad estimada 195.000 fotocopias en blanco y negro y 5.000 a color UY-ANEP-157786-GO-RFQ- MATER INICIAL 2020 / Monitoring and Evaluation Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-02- Materiales fungibles para IBRD / 86750 Post Open - National 500.00 57.77 Signed System Quotations Envelope 06 19 20 26 encuentros docentes de Educación Inicial 2020 UY-ANEP-166127-GO-RFQ ALF. Y COLCH 2020 / Adquisición de 800 alfombras Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-06- IBRD / 86750 Early Education Post Open - National 12,000.00 10,882.40 Signed de goma eva y 700 Quotations Envelope 01 30 30 15 colchonetas para aulas de Educación inicial de ETC UY-ANEP-156958-GO-RFQ- RADIOGRAB 2020 / Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-06- 2020-05- IBRD / 86750 Early Education Post Open - National 30,000.00 10,399.28 Completed Radiograbadores y Kit de Quotations Envelope 01 24 27 24 02 audio para ETC UY-ANEP-189888-GO-RFQ- KIT AUDIO 2020 / 30 Combos Request for Single Stage - One 2020-08- 2020-09- 2020-10- 2020-12- Parlantes activos, micrófonos, IBRD / 86750 Early Education Post Open - National 25,000.00 19,650.00 Signed Quotations Envelope 28 25 20 24 trípodes y jirafas para Escuelas de Tiempo Completo UY-ANEP-156952-GO-RFQ- CORTINAS,ALF. 2020 / Request for Single Stage - One 2020-02- 2020-03- 2020-05- IBRD / 86750 Early Education Post Open - National 7,500.00 0.00 Canceled Cortinas, alfombras y Quotations Envelope 20 17 04 colchonetas para ETC UY-ANEP-156955-GO-RFQ- EQ AUDIOVISUA 2020 / Request for Single Stage - One 2020-02- 2020-03- 2020-05- IBRD / 86750 Early Education Post Open - National 9,000.00 0.00 Canceled Equipamiento Audiovisual Quotations Envelope 17 11 11 para ETC - Amplificadores UY-ANEP-193322-GO-RFQ- CARROS ANDAR 2020 / Request for Single Stage - One 2020-09- 2020-11- 2020-11- 2021-01- Adquisiciones de 16 IBRD / 86750 Primary Education Post Open - National 12,000.00 11,910.48 Signed Quotations Envelope 23 20 18 19 Bibliotecas y 16 carros para la Colección Andariega 2020 UY-ANEP-199051-GO-RFQ- LIBROS ANDAR 2020 / 1800 Libros para la Colección Under Andariega para armar 18 Request for Single Stage - One 2020-10- 2020-12- 2021-02- IBRD / 86750 Early Education Post Open - National 42,000.00 0.00 Implementati bibliotecas con 100 títulos Quotations Envelope 14 03 26 on cada una a entregar en los niveles de Educación Inicial de ETC en el año 2021 UY-ANEP-199057-GO-RFQ- CAJAS LIBROS 2020 / 54 Cajas Multiuso en PVC con tapa para Request for Single Stage - One 2020-10- 2020-10- 2020-10- 2020-12- IBRD / 86750 Early Education Post Open - National 320.00 231.09 Signed guardar y transportar los Quotations Envelope 14 26 26 04 libros de la Colección Andariega UY-ANEP-217877-GO-RFQ- Pending VAJILLA 2021 / VAJILLA Y Request for Single Stage - One 2021-05- 2021-07- 2021-10- IBRD / 86750 Early Education Post Open - National 43,000.00 0.00 Implementati ALUMINIO PARA ESCUELAS DE Quotations Envelope 03 23 21 on TIEMPO COMPLETO UY-ANEP-218344-GO-RFQ- ELECTRODOM 2021 / Pending Request for Single Stage - One 2021-05- 2021-07- 2021-09- Electrodomésticos semi IBRD / 86750 Early Education Post Open - National 43,000.00 0.00 Implementati Quotations Envelope 03 16 14 industrial para Escuelas de on Tiempo Completo UY-ANEP-156965-GO-RFQ- HELADERAS 2020 / Heladeras Request for Single Stage - One 2020-05- 2020-06- 2020-08- IBRD / 86750 Early Education Post Open - National 44,000.00 0.00 Canceled con freezer y freezer Quotations Envelope 04 19 18 horizontal para ETC UY-ANEP-229505-GO-RFQ- LIC ZOOM EDUC 2021 / 20 Licencias de Zoom educativo Request for Single Stage - One 2021-04- 2021-05- 2021-05- 2022-05- que permitan cumplir con la IBRD / 86750 Early Education Post Open - National 2,500.00 2,196.00 Signed Quotations Envelope 26 12 03 11 planificación de los cursos de Formación en Servicio para el año 2021. NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents as Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 UY-ANEP-14561-NC-RFQ- INSPECTORES 2017 / Jornada Request for Single Stage - One 2017-05- 2017-06- 2017-05- 2017-12- IBRD / 86750 Early Education Post Open - National 28,000.00 20,436.68 Signed de Inspectores TC . 2 Quotations Envelope 15 06 29 05 jornadas/año - 115 personas UY-ANEP-14487-NC-RFQ FORMADORES 2017 / 9 Request for Single Stage - One 2017-05- 2017-06- 2017-05- 2017-12- Encuentros de Formadores de IBRD / 86750 Early Education Post Open - National 48,000.00 28,990.00 Signed Quotations Envelope 15 06 29 31 TC de junio a diciembre - 65 participantes por fecha UY-ANEP-14716-NC-RFQ- GESTION ESC NUEVAS / 2017 Request for Single Stage - One 2017-03- 2017-03- 2017-03- 2017-07- - 4 Encuentros Gestión IBRD / 86750 Early Education Post Open - National 17,906.00 16,122.38 Signed Quotations Envelope 08 24 24 15 Escuelas Nuevas de TC - 90 participantes UY-ANEP-14562-NC-RFQ- DIRECTORES 2017 / Jornada Request for Single Stage - One 2017-05- 2017-06- 2017-06- 2017-11- IBRD / 86750 Early Education Post Open - National 36,000.00 32,676.93 Signed Directores . 2 jornadas/año - Quotations Envelope 15 06 13 07 145 personas UY-ANEP-15335-NC-RFQ / Jornadas apoyo a la Request for Single Stage - One 2017-05- 2017-05- 2017-05- 2017-06- Coordinación de Tiempo IBRD / 86750 Early Education Post Open - National 10,500.00 8,576.61 Signed Quotations Envelope 17 29 30 01 Completo del CEIP - Junio 2017 UY-ANEP-17531-NC-RFQ- ALOJ SEMINARIO INT / Alojamiento para docentes del Interior que participarán en el Request for Single Stage - One 2017-06- 2017-08- 2017-07- 2017-08- IBRD / 86750 Early Education Post Open - National 12,000.00 3,247.89 Signed Seminario Internacional a Quotations Envelope 20 01 27 31 realizarse en la IMM de Educación Inicial los días 28 y 29 de agosto 2017. UY-ANEP-19221-NC-RFQ / Encuentro 14 de julio 2017 Directores de Tiempo Request for Single Stage - One 2017-07- 2017-07- 2017-07- 2017-07- Completo de Rivera, IBRD / 86750 Early Education Post Open - National 3,000.00 1,302.95 Signed Quotations Envelope 03 10 06 14 Tacuarembó, Salto y Paysandú con equipo de Cultura Institucional UY-ANEP-19230-NC-RFQ / Jornadas apoyo a la Request for Single Stage - One 2017-07- 2017-07- 2017-08- 2017-12- Coordinación de Tiempo IBRD / 86750 Early Education Post Open - National 15,000.00 16,651.49 Signed Quotations Envelope 04 18 16 31 Completo del CEIP. Agosto- Diciembre 2017 UY-ANEP-14802-NC-RFB- CONGRESO ETC 2017 / Single Stage - One 2017-06- 2017-06- 2017-07- 2017-07- 2017-07- 2017-08- IBRD / 86750 Early Education Post Request for Bids Open - National 60,000.00 0.00 Canceled Congreso de Tiempo Envelope 01 05 05 17 27 31 Completo 2017 UY-ANEP-19868-NC-RFQ / ALOJAMIENTO 35 docentes Request for Single Stage - One 2017-07- 2017-07- 2017-07- 2017-07- ETC Interior ENCUENTRO IBRD / 86750 Early Education Post Open - National 1,100.00 173.76 Signed Quotations Envelope 12 21 24 29 EDUCACIÓN INICIAL 29 JULIO 2017 UY-ANEP-23913-NC-RFQ- IMPRESOS SEMINARIO / Folletería, banners, certificados e invitaciones Request for Single Stage - One 2017-08- 2017-08- 2017-08- 2017-08- 2017-08- IBRD / 86750 Early Education Post Open - National 2,000.00 562.06 Completed para el SEMINARIO Quotations Envelope 06 15 09 25 22 INTERNACIONAL a realizarse en la IMM, el 28 y 29 de agosto 2017 UY-ANEP-27748-NC-RFQ- DIRECTORES / ESCUELAS Request for Single Stage - One 2017-09- 2017-09- 2017-09- IBRD / 86750 Early Education Post Open - National 1,500.00 0.00 Canceled NUEVAS - LOGÍSTICA PARA Quotations Envelope 14 25 30 JORNADA CON DIRECTORES UY-ANEP-29308-NC-RFQ- ETIQUETAS LIBROS / Etiquetas Request for Single Stage - One 2017-09- 2017-09- 2017-10- 2017-10- IBRD / 86750 Early Education Post Open - National 1,800.00 732.06 Signed auto adhesivas para colección Quotations Envelope 21 29 03 04 libros carros ANDARIEGOS UY-ANEP-14718-NC-RFQ- ENCUENTRO DIR 2017 / Encuentro 27 junio 2017 Request for Single Stage - One 2017-05- 2017-06- 2017-06- 2017-06- IBRD / 86750 Early Education Post Open - National 1,800.00 1,184.10 Signed Directores de Montevideo y Quotations Envelope 22 05 01 27 Canelones con equipo de Cultura Institucional UY-ANEP-34709-NC-RFQ- COFFEE JORNADA / Servicio Request for Single Stage - One 2017-11- 2017-11- 2017-11- 2017-11- de coffee break para jornada IBRD / 86750 Early Education Post Open - National 1,200.00 970.48 Signed Quotations Envelope 03 08 07 13 de Maestros de Tiempo Completo UY-ANEP-19225-NC-DIR / Sala y Coffee Break para Seminario Internacional a 2017-06- 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- IBRD / 86750 Early Education Post Direct Selection Direct 8,500.00 4,242.13 Signed realizarse en la Intendencia 27 22 27 27 10 27 29 Municipal de Montevideo el 28 y 29 agosto 2017 UY-ANEP-39581-NC-RFQ- JORNADA C-ANDARIEGA / Jornadas Colección Andariega . Logística para jornadas - Request for Single Stage - One 2018-02- 2018-03- 2018-04- 2018-11- alquiler de salones equipados, IBRD / 86750 Early Education Post Open - National 45,000.00 23,714.97 Signed Quotations Envelope 09 04 03 03 servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39566-NC-RFQ- APOYO TC DIRECTORES / Apoyo a la Inspección Nacional de Tiempo Completo Encuentro de Directores de Marzo a Diciembre 2018. Request for Single Stage - One 2018-03- 2018-03- 2018-08- 2018-12- IBRD / 86750 Early Education Post Open - National 32,000.00 15,188.32 Signed Logística para jornadas - Quotations Envelope 05 23 16 31 alquiler de salones equipados, servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39572-NC-RFQ- APOYO TC INSPECT / Apoyo a la Inspección Nacional de Tiempo Completo Encuentro de Inspectores desde marzo a Request for Single Stage - One 2018-03- 2018-03- 2018-03- 2018-12- diciembre 2018. Logística IBRD / 86750 Early Education Post Open - National 18,000.00 5,692.71 Signed Quotations Envelope 05 23 20 31 para jornadas - alquiler de salones equipados, servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39578-NC-RFQ- INSPECTORES ETC / Jornadas de Inspectores de ETC. Logística para jornadas - Request for Single Stage - One 2018-03- 2018-03- 2018-03- 2018-10- alquiler de salones equipados, IBRD / 86750 Early Education Post Open - National 15,000.00 10,612.08 Signed Quotations Envelope 02 18 20 29 servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39552-NC-RFB- FORMADORES FEB-JUL / Encuentros de Formadores ETC . Logística para jornadas Single Stage - One 2018-01- 2018-03- 2018-01- 2018-02- 2018-04- 2018-02- 2018-04- 2018-02- 2018-04- 2018-12- - alquiler de salones IBRD / 86750 Early Education Post Request for Bids Open - National 75,000.00 38,562.73 Signed Envelope 04 02 04 05 04 08 04 15 06 07 equipados, servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . Page 6 UY-ANEP-39576-NC-RFB- DIRECTORES ETC / Jornadas encuentros de Maestros Directores de ETC. Logística Single Stage - One 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- 2018-02- 2018-03- 2018-02- 2018-03- 2018-10- para jornadas - alquiler de IBRD / 86750 Early Education Post Request for Bids Open - National 65,000.00 41,494.40 Signed Envelope 17 05 17 16 08 28 12 28 13 22 salones equipados, servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-39557-NC-RFB- JORNADAS ED INICIAL / Jornadas de Educación Inicial. Logística para jornadas - Single Stage - One 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-10- alquiler de salones equipados, IBRD / 86750 Early Education Post Request for Bids Open - National 90,000.00 24,124.72 Signed Envelope 12 07 12 12 23 16 27 23 01 27 servicio de catering (desayunos, cofee break, almuerzos, cenas) , alojamiento, traslados . UY-ANEP-48227-NC-RFQ- JORNADAS CON SOUTO / Jornadas de Formadores PAEPU con experta Marta Souto, Logística para Request for Single Stage - One 2018-02- 2018-02- 2018-06- 2018-07- IBRD / 86750 Early Education Post Open - National 20,000.00 10,886.04 Signed jornadas: alquiler de salones Quotations Envelope 16 28 13 31 equipados, servicio de catering (desayuno, coffee break, almuerzos y cenas), alojamiento y transporte. UY-ANEP-52242-NC-RFQ- CURSO I 2018 / Jornadas para Maestros y Directores de ETC - CURSO 1 a realizarse en 2018. Logística para Request for Single Stage - One 2018-03- 2018-04- 2018-04- 2018-11- IBRD / 86750 Early Education Post Open - National 40,000.00 32,896.60 Signed jornadas: alquiler de salones Quotations Envelope 12 03 04 17 equipados, servicio de catering (desayuno, coffee break, almuerzos y cenas), alojamiento y transporte. UY-ANEP-58126-NC-RFQ- JORNADA 24-4-18 / JORNADA CAPACITACIÓN Request for Single Stage - One 2018-04- 2018-04- 2018-04- 2018-04- Directores y Maestros de IBRD / 86750 Early Education Post Open - National 7,000.00 5,811.64 Signed Quotations Envelope 13 19 18 24 Escuelas que participan en observación de aula a realizarse el 24 de abril 2018 UY-ANEP-63188-NC-DIR- DIRECTORE COMPL2018 / Logística para dos jornadas de 2018-05- 2018-05- 2018-05- 2018-05- 2018-06- 2018-05- 2018-07- IBRD / 86750 Early Education Post Direct Selection Direct 15,000.00 13,980.18 Signed capacitación de Directores de 17 16 22 14 22 24 31 ETC a realizarse en mayo y julio 2018 UY-ANEP-81638-NC-RFQ- ETIQUETAS 2018 / Etiquetas Request for Single Stage - One 2018-10- 2018-10- 2018-10- para libros colección IBRD / 86750 Early Education Post Open - National 1,500.00 0.00 Canceled Quotations Envelope 18 26 31 andariega a ser entregados principio 2019 UY-ANEP-45071-NC-DIR- IMPRESION CATALOGO / 2018-01- 2018-01- 2018-12- 2018-12- 2018-12- 2018-12- 2019-02- Impresión de Catálogos para IBRD / 86750 Early Education Post Direct Selection Direct 3,700.00 4,295.23 Signed 22 02 10 05 14 18 28 la Colección Andariega - IMPRENTA MASTERGRAF SRL UY-ANEP-94804-NC-RFQ- JORNADA BIRF 2019 / ENCUENTRO con EXPERTA BANCO MUNDIAL Request for Single Stage - One 2019-01- 2019-01- 2019-01- 2019-02- Alojamientos para Directores IBRD / 86750 Early Education Post Open - National 1,200.00 580.52 Signed Quotations Envelope 21 25 22 12 y Maestros de TC que participarán en la Jornada con Experta enviada por el Banco Mundial el 12/2/19 UY-ANEP-94805-NC-RFQ- FORM FEB-MAR 2019 / FORMADORES DE TC - Logística para encuentro de Formadores de TC a realizarse Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- IBRD / 86750 Early Education Post Open - National 13,000.00 10,398.45 Signed en Febrero y Marzo 2019 Quotations Envelope 21 05 01 08 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena). UY-ANEP-94891-NC-RFQ- JORN-DIREC-MAR2019 / EDUCACIÓN INICIAL - DIRECTORES Logística para Jornada con Directores de Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- IBRD / 86750 Early Education Post Open - National 4,000.00 3,102.07 Signed Educación Inicial a realizarse Quotations Envelope 28 13 07 29 en Marzo 2019 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayuno y Coffee Break). UY-ANEP-94892-NC-RFQ- JOR-ED INIC 3-2019 / DOCENTES EDUCACIÓN INICIAL Una Mirada Integradora. Logística para Request for Single Stage - One 2019-02- 2019-02- 2019-02- 2019-03- encuentro de Docentes de IBRD / 86750 Early Education Post Open - National 5,500.00 3,909.73 Signed Quotations Envelope 05 18 27 30 Educación Inicial . Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayuno y Coffee Break). UY-ANEP-94895-NC-RFQ- CURSO I MARZO 2019 / CURSO I Logística para encuentro de docentes a Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- realizarse en Marzo 2019 IBRD / 86750 Early Education Post Open - National 6,000.00 4,693.60 Signed Quotations Envelope 30 19 07 16 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena). UY-ANEP-94897-NC-RFQ- JORNADA MARZO 2019 / DIRECTORES E INSPECTORES TC. Logística para encuentro de Directores e Inspectores Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- IBRD / 86750 Early Education Post Open - National 11,000.00 9,663.32 Signed TC a realizarse en Marzo Quotations Envelope 30 19 07 12 2019 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena). UY-ANEP-94898-NC-RFQ- JORNADA MARZO 2019 / ENCUENTRO con MARTA SOUTO. Logística para encuentro de Formadores de TC con la Consultora Marta Request for Single Stage - One 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- IBRD / 86750 Early Education Post Open - National 5,000.00 3,629.25 Completed Souto a realizarse en Marzo Quotations Envelope 05 18 12 27 27 2019 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena). UY-ANEP-100260-NC- RFQJOR-ED INIC 2019 / DOCENTES EDUCACIÓN INICIAL Una Mirada Integradora. Logística para Request for Single Stage - One 2019-03- 2019-04- 2019-04- 2019-10- encuentro de Docentes de IBRD / 86750 Early Education Post Open - National 26,000.00 11,297.16 Signed Quotations Envelope 15 05 12 19 Educación Inicial. Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayuno y Coffee Break). ABRIL A OCTUBRE 2019 Page 7 UY-ANEP-100269-NC-RFQ- JORN-DIREC-2019 / EDUCACIÓN INICIAL - DIRECTORES Logística para Jornada con Directores de Request for Single Stage - One 2019-03- 2019-03- 2019-03- 2019-10- IBRD / 86750 Early Education Post Open - National 28,000.00 21,681.41 Signed Educación Inicial. Quotations Envelope 15 30 26 25 Alojamientos, Alquiler del salón equipado, Servicio de Catering (Desayuno y Coffee Break). ABRIL A OCTUBRE 2019 UY-ANEP-100270-NC-RFQ- CONFERENCIAS 2019 / EDUCACIÓN INICIAL. Dos Request for Single Stage - One 2019-04- 2019-04- 2019-04- 2019-08- conferencias con Consultoras IBRD / 86750 Early Education Post Open - National 5,000.00 11,124.21 Signed Quotations Envelope 02 21 12 17 Expertas a realizarse en mayo y agosto 2019. Servicio de Catering (Coffee Break). UY-ANEP-100271-NC-RFQ- ALOJ ANDARIEGA-19 / ALOJAMIENTOS COLECCIÓN ANDARIEGA - Para docentes Request for Single Stage - One 2019-03- 2019-03- 2019-03- 2019-10- IBRD / 86750 Early Education Post Open - National 7,000.00 4,764.31 Signed de Educación Inicial que Quotations Envelope 13 31 12 26 participaran en encuentros a realizarse entre abril y octubre 2019. UY-ANEP-100274-NC-RFQ- CURSO I 201 / CURSO I Logística para encuentro de docentes . Alojamientos, Request for Single Stage - One 2019-03- 2019-04- 2019-03- 2019-10- Alquiler del salón equipado, IBRD / 86750 Early Education Post Open - National 35,000.00 25,778.44 Signed Quotations Envelope 15 01 07 19 Servicio de Catering (Desayunos, Coffee Break) a realizarse de ABRIL a OCTUBRE 2019 UY-ANEP-100279-NC-RFQ- JORNAD SOUTO 2019 / ENCUENTROS con MARTA SOUTO. Logística para encuentros de Formadores de TC con la Consultora Marta Request for Single Stage - One 2019-06- 2019-06- 2019-05- 2019-10- 2019-10- IBRD / 86750 Early Education Post Open - National 16,000.00 16,266.71 Completed Souto. Alojamientos, Alquiler Quotations Envelope 06 25 09 30 30 del salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena) a realizarse en JULIO Y OCTUBRE 2019 UY-ANEP-100284-NC- DIRECT E INSPECT 2019 / DIRECTORES E INSPECTORES TC. Logística para encuentro de Directores e Inspectores Request for Single Stage - One 2019-02- 2019-03- 2019-03- 2019-10- TC Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 44,300.00 41,725.67 Signed Quotations Envelope 21 18 18 10 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena) a realizarse desde ABRIL a NOVIEMBRE 2019 UY-ANEP-100295-NC-RFQ- COHORTE 1 - 2019 / DIRECTORES TC COHORTE 1 Proceso formativo 2017- 2018. Logística para encuentros de Directores TC . Request for Single Stage - One 2019-04- 2019-04- 2019-04- 2019-09- IBRD / 86750 Early Education Post Open - National 11,000.00 18,287.87 Signed Alojamientos, Alquiler del Quotations Envelope 05 24 30 10 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena) a realizarse entre MAYO y SETIEMBRE 2019 UY-ANEP-100299-NC-RFQ- JORN-COORD-2019 / ENCUENTROS con COORDINACIÓN GENERAL y asesora GRACIELA FRIGERIO . Logística para el desarrollo de Request for Single Stage - One 2019-03- 2019-03- 2019-04- 2019-12- IBRD / 86750 Early Education Post Open - National 18,000.00 13,830.56 Signed jornadas: Alojamientos, Quotations Envelope 05 25 24 03 Alquiler del salón equipado, Servicio de Catering (desayunos, coffee, almuerzo y cena), a realizarse desde ABRIL a DICIEMBRE 2019 UY-ANEP-100315-NC-RFQ- FORMADORES 2019 / FORMADORES DE TC - Logística para encuentro de Formadores de TC . Request for Single Stage - One 2019-02- 2019-03- 2019-04- 2019-12- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 48,000.00 42,103.39 Signed Quotations Envelope 20 20 01 06 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo y Cena) a realizarse entre ABRIL y DICIEMBRE 2019 UY-ANEP-106181-NC-DIR- AMPL CATALOGOS2019 / Ampliación impresión Catálogos Colección 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- IBRD / 86750 Early Education Post Direct Selection Direct 4,200.00 3,773.25 Signed Andariega para entregar junto 14 14 18 14 21 28 30 con las Bibliotecas en Escuelas que constituyen cohorte 2017- 2018-2019 UY-ANEP-113313-NC-RFQ- JORN INSP TC-2019 / Jornada para Inspectores referente (apoyo a la Inspección Nacional de T.C). Logística para el desarrollo de la Request for Single Stage - One 2019-05- 2019-05- 2019-05- 2019-12- IBRD / 86750 Early Education Post Open - National 10,000.00 7,376.51 Signed jornadas : Alojamiento, Quotations Envelope 10 20 17 03 alquiler de salón equipado, servicio de Catering ( desayuno, coffe, almuerzo, cena ) en Mayo y diciembre 2019. UY-ANEP-113315-NC-RFQ- JORN DIREC TC-2019 / Encuentro Directores - Apoyo a la Inspección Nacional de TC- Logística para el desarrollo de Request for Single Stage - One 2019-05- 2019-05- 2019-05- 2019-10- las jornadas : Alojamiento, IBRD / 86750 Early Education Post Open - National 12,000.00 9,065.31 Signed Quotations Envelope 13 29 17 29 Alquiler de salón equipado, Servicio de Catering ( desayuno, cofee,almuerzo, cena) a realizarse en Octubre del 2019 UY-ANEP-116997-NC-RFQ- ALOJ-SEMINARIOS / Alojamientos para docentes de los pueblos de Nico Pérez, Florida y Batlle y Ordoñez, Request for Single Stage - One 2019-05- 2019-06- 2019-06- 2019-09- IBRD / 86750 Early Education Post Open - National 1,100.00 681.72 Terminated Lavalleja que participarán en Quotations Envelope 31 05 05 06 los seminarios territorio a efectuarse en Montevideo los días 7/06, 19/07, 09/08 y 06/09. Cantidad 10 UY-ANEP-128558-NC-RFQ- ALOJAMIENTOS 2019 / Alojamientos para docentes del Interior que participarán Request for Single Stage - One 2019-08- 2019-08- 2019-08- 2019-10- IBRD / 86750 Early Education Post Open - National 2,500.00 1,242.32 Signed en jornadas de capacitación el Quotations Envelope 26 31 30 25 6 de setiembre y el 25 de octubre 2019 (40 y 30 alojamientos respectivamente) UY-ANEP-157748-NC-RFQ- FORM FEB/MZO 2020 / Servicio de alojamiento con Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-03- desayuno para docentes del IBRD / 86750 Early Education Post Open - National 2,700.00 2,466.04 Signed Quotations Envelope 10 17 14 20 Interior que participarán en los encuentros de Formadores febrero/marzo 2020 Page 8 UY-ANEP-157749-NC-RFQ- FORM ABR-DIC 2020 / Servicio de alojamiento con Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-12- desayuno para docentes del IBRD / 86750 Early Education Post Open - National 6,700.00 2,003.22 Signed Quotations Envelope 02 22 16 30 Interior que participarán en los encuentros de Formadores abril- diciembre 2020 UY-ANEP-157751-NC-RFQ- CURSOI ABR-NOV2020 / CURSO I Logística para encuentro de docentes. Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-11- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 31,000.00 26,351.46 Signed Quotations Envelope 02 19 12 19 salón equipado, Servicio de Catering (Desayunos, Coffee Break) a realizarse de ABRIL a NOVIEMBRE 2020 UY-ANEP-157753-NC-RFQ- DIREC INICIAL 2020 / DIRECTORES DE EDUCACIÓN INICIAL - Logística para encuentro de docentes . Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-10- IBRD / 86750 Early Education Post Open - National 41,000.00 4,385.66 Signed Alojamientos, Alquiler del Quotations Envelope 02 27 12 31 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzos) a realizarse de ABRIL a OCTUBRE 2020 UY-ANEP-157763-NC-RFQ- DIRECT. MARZO 2020 / DIRECTORES - Logística para encuentro de docentes . Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-03- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 6,300.00 6,348.01 Signed Quotations Envelope 12 21 27 31 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo) a realizarse en MARZO 2020 UY-ANEP-157768-NC-RFQ- DIREC ABR-OCT 2020 / DIRECTORES - Logística para encuentro de docentes . Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-10- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 32,000.00 22,138.15 Signed Quotations Envelope 02 17 17 30 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo) a realizarse desde ABRIL a OCTUBRE 2020 UY-ANEP-157775-NC-RFQ- INSP MARZO 2020 / INSPECTORES- Logística para encuentro de docentes . Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-03- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 2,300.00 4,255.53 Signed Quotations Envelope 11 21 27 31 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo) a realizarse en MARZO 2020 UY-ANEP-157776-NC-RFQ- INSP JUN-OCT 2020 / INSPECTORES - Logística para encuentro de docentes . Request for Single Stage - One 2020-05- 2020-05- 2020-02- 2020-10- Alojamientos, Alquiler del IBRD / 86750 Early Education Post Open - National 7,000.00 3,769.55 Signed Quotations Envelope 04 19 27 30 salón equipado, Servicio de Catering (Desayunos, Coffee Break, Almuerzo) a realizarse en JUNIO a OCTUBRE 2020 UY-ANEP-157781-NC-RFQ- AUDIO INICIAL 2020 / Servicio audio, video y apoyo Request for Single Stage - One 2020-03- 2020-03- 2020-11- IBRD / 86750 Early Education Post Open - National 2,000.00 0.00 Canceled tecnológico para jornadas de Quotations Envelope 04 15 30 Educación Inicial a realizarse entre abril y noviembre 2020 UY-ANEP-157782-NC-RFQ- MAESTROS MZO 2020 / MAESTROS ED INICIAL - Logística para encuentro de Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-03- docentes . Alojamientos, IBRD / 86750 Early Education Post Open - National 5,000.00 4,564.84 Signed Quotations Envelope 10 19 27 31 Alquiler del salón equipado, Servicio de Catering (Desayunos, Coffee Break) a realizarse en MARZO 2020 UY-ANEP-157783-NC-RFQ- MAEST ABR-NOV 2020 / MAESTROS INICIAL - Logística para encuentro de docentes . Request for Single Stage - One 2020-03- 2020-03- 2020-06- 2020-11- IBRD / 86750 Early Education Post Open - National 40,000.00 35,670.12 Signed Alojamientos, Servicio de Quotations Envelope 04 30 01 30 Catering (Desayunos, Coffee Break, ) a realizarse desde ABRIL - NOVIEMBRE 2020 UY-ANEP-157780-NC-RFQ- ANDAR ABR-NOV 2020 / COLECCIÓN ANDARIEGA- Logística para encuentro de docentes . Alojamientos ,alquiler de salon equipado , Request for Single Stage - One 2020-03- 2020-03- 2020-03- 2020-11- IBRD / 86750 Early Education Post Open - National 15,000.00 8,269.02 Signed Servicio de Catering Quotations Envelope 11 27 25 14 (Desayunos, Coffee Break, ) a realizarse en 5 encuentros entre ABRIL y NOVIEMBRE 2020- Participantes - 80 por jornada. UY-ANEP-199059-NC-RFQ- IMP CATALOGO 2020 / Request for Single Stage - One 2020-10- 2020-10- 2020-11- 2021-02- Impresión de 25 catálogos de IBRD / 86750 Early Education Post Open - National 1,500.00 351.92 Signed Quotations Envelope 14 28 09 08 libros para la colección andariega CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UY-ANEP-14569-CS-INDV- Individual Monitoring and Evaluation 2017-06- 2017-06- 2017-06- 2017-12- AS TERMICO 2017 / Asesores IBRD / 86750 Post Consultant Limited 3,000.00 0.00 Canceled 2017-06-01 System 01 01 01 29 Técnicos Eventuales Térmicos Selection UY-ANEP-14803-CS-INDV- Individual SARAVIA / Carola Saravia, Monitoring and Evaluation 2017-04- 2017-05- 2017-05- 2017-06- 2017-08- 2017-09- IBRD / 86750 Post Consultant Direct 7,500.00 6,335.77 Signed 2017-05-12 contratación Técnica Gestión System 05 15 18 19 09 19 Selection Cultural UY-ANEP-14559-CS-CDS- THE LEARNING 2017 / Desarrollo y gestión de sistema de Información para Monitoring and Evaluation 2017-04- 2017-05- 2017-09- 2017-08- 2017-12- la detección temprana de IBRD / 86750 Post Direct Selection Direct 120,000.00 120,000.00 Signed 2017-05-22 System 26 22 05 02 31 debilidades en el desarrollo evolutivo de los niños de Inicial - año 2107 (The Learning Bar) UY-ANEP-14571-CS-INDV- Individual DIRECT OBRA 2017 / 8 Pending 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Primary Education Post Consultant Limited 48,500.00 0.00 2017-06-01 Directores de Obra para obras Implementation 01 01 01 29 Selection a iniciar 2017 UY-ANEP-14482-CS-INDV Individual MARTA SOUTO 2017 / Asesor Monitoring and Evaluation 2018-03- 2017-06- 2017-04- 2017-06- 2017-04- 2017-07- 2017-04- 2017-08- 2017-08- IBRD / 86750 Post Consultant Direct 1,400.00 4,200.00 Completed 2017-06-14 externo para Formación en System 09 19 18 26 18 03 27 31 31 Selection Servicio Dra. Marta Souto Page 9 UY-ANEP-14556-CS-INDV- Individual UCP 2017 / Coordinación 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 119,064.00 83,195.86 Signed 2017-06-01 Administrativa 1 contrato 01 01 01 01 01 01 31 Selection junio 2017 - mayo 2022 UY-ANEP-14555-CS-INDV- Individual UCP-2017 / Equipamiento 2 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 359,672.00 223,748.09 Signed 2017-06-01 contratos junio 2017 - mayo 01 01 01 01 01 01 01 31 Selection 2022 UY-ANEP-14553-CS-INDV- Individual UCP-2017 / Adquisiciones 4 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 776,072.00 320,430.42 Signed 2017-06-01 contratos junio 2017 - mayo 01 01 01 01 01 01 01 31 Selection 2022 UY-ANEP-14558-CS-INDV- Individual UCP 2017 / Asesoramiento 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 169,276.00 96,730.90 Signed 2017-06-01 Jurídico 1 Contrato junio 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14557-CS-INDV- Individual UCP-2017 / Apoyo 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 395,295.00 243,385.63 Signed 2017-06-01 Informático 3 contratos junio 01 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14552-CS-INDV- Individual UCP 2017 / Programación y 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 483,820.00 304,287.96 Signed 2017-06-01 Monitoreo 3 contratos junio 01 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14551-CS-INDV- Individual UCP-2017 / Planta Física 19 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 3,362,686.00 2,690,843.69 Signed 2017-06-01 contratos junio 2017 - mayo 01 01 01 01 01 01 01 31 Selection 2022 UY-ANEP-14550-CS-INDV- Individual UCP-2017 / Formación en 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2018-01- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 388,337.00 89,517.33 Signed 2017-06-01 Servicio 3 contratos junio 01 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14554-CS-INDV- Individual UCP-2017 / Finanzas y 2017-07- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2022-05- IBRD / 86750 Early Education Post Consultant Direct 225,700.00 109,249.62 Signed 2017-06-01 Desembolsos 1 contrato junio 01 01 01 01 01 01 01 31 Selection 2017 - mayo 2022 UY-ANEP-14563-CS-INDV- Individual AS CIVILES 2017 / 5 Asesores Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 33,000.00 0.00 2017-06-01 Técnicos Eventuales System Implementation 01 01 01 29 Selection Ingenieros Civiles UY-ANEP-14548-CS-INDV- UCP 2017 / División Individual 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2019-05- 2022-05- Investigación, Evaluación y IBRD / 86750 Early Education Post Consultant Direct 314,292.00 90,660.04 Signed 2017-06-01 01 01 01 01 01 01 07 31 Estadística 2 contratos junio Selection 2017 - mayo 2022 UY-ANEP-14564-CS-INDV- Individual AS ELECTRICOS 2017 / 5 Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 18,700.00 0.00 2017-06-01 Asesores Técnicos Eventuales System Implementation 01 01 01 29 Selection - Ingenieros Eléctricos UY-ANEP-14565-CS-INDV- Individual AS SANITARIOS 2017 / 5 Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 10,900.00 0.00 2017-06-01 Asesores Técnicos Eventuales System Implementation 01 01 01 29 Selection Ingenieros Sanitarios UY-ANEP-14566-CS-INDV- Individual AS AGRIMENSOR 2017 / 5 Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 4,700.00 0.00 2017-06-01 Asesores Técnicos Eventuales System Implementation 01 01 01 29 Selection Ingenieros Agrimensores UY-ANEP-14567-CS-INDV- Individual METRAJISTAS 2017 / 5 Monitoring and Evaluation Under 2017-06- 2017-06- 2017-06- 2017-12- IBRD / 86750 Post Consultant Limited 3,700.00 0.00 2017-06-01 Asesores Técnicos Eventuales System Implementation 01 01 01 29 Selection Metrajistas UY-ANEP-16524-CS-INDV / Individual Monitoring and Evaluation 2019-03- 2017-08- 2019-03- 2017-08- 2019-03- 2017-09- 2018-09- Ayudante para Investigación " IBRD / 86750 Post Consultant Open 8,700.00 0.00 Canceled 2017-06-19 System 26 18 26 25 26 04 04 Diagnostico de Género" Selection UY-ANEP-19234-CS-CDS / Instituto Nacional de Monitoring and Evaluation 2015-11- 2017-06- 2015-12- 2017-06- 2017-05- 2021-05- IBRD / 86750 Post Direct Selection Direct 1,500,000.00 1,500,000.00 Signed 2017-06-27 Evaluación Educativa (INEED) System 19 27 18 27 31 31 2017-2021 UY-ANEP-45069-CS-CDS- DISENO GRAFICO / Diseño 2018-01- 2018-02- 2018-04- IBRD / 86750 Early Education Post Direct Selection Direct 1,000.00 0.00 Canceled 2018-01-22 Gráfico del Catálogo para la 22 15 15 Colección Andariega UY-ANEP-48225-CS-INDV- SOUTO 2018 / CONSULTOR Individual Monitoring and Evaluation 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2018-07- 2018-07- EXTERNO PARA INFORMACIÓN IBRD / 86750 Post Consultant Direct 8,000.00 8,000.00 Completed 2018-02-08 System 01 08 23 02 27 31 31 EN SERVICIO Dr. MARTA Selection SOUTO. UY-ANEP-53689-CS-INDV- PABLO GARCIA 2018 / CONSULTOR PABLO GARCIA - Individual Monitoring and Evaluation 2018-03- 2018-03- 2018-04- 2018-05- 2018-06- 2018-06- Encuentro con equipo Curso I IBRD / 86750 Post Consultant Direct 1,000.00 1,000.00 Signed 2018-03-20 System 06 22 20 10 25 26 y Conferencia a Directores de Selection Tiempo Completo. Tema Tránsito escolar e inclusión UY-ANEP-53694-CS-INDV G- UNTOIGLICH 2018 / CONSULTOR GISELA Individual UNTOIGLICH - Conferencia Monitoring and Evaluation 2018-03- 2018-03- 2018-04- 2018-05- 2018-05- 2018-05- IBRD / 86750 Post Consultant Direct 1,000.00 1,000.00 Signed 2018-03-20 para Docentes de Educación System 01 22 20 10 26 26 Selection Inicial. Tema: Los diagnósticos en la 1ra infancia se escriben con lapiz " UY-ANEP-52250-CS-INDV- RICARDO BAQUERO / Honorarios Consultor : Lic. Psicopedagogia esp. en re- Individual Monitoring and Evaluation 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- 2018-04- 2018-04- 2018-04- educación Ricardo Baquero IBRD / 86750 Post Consultant Direct 1,700.00 1,700.00 Signed 2018-03-20 System 12 22 20 02 03 10 13 14 para brindar 2 conferencias el Selection día 13 y 14 de abril del 2018 con maestros y Directores de ETC UY-ANEP-16521-CS-CQS / Individual Coordinador Investigación " Monitoring and Evaluation 2018-06- 2018-05- 2018-12- 2018-06- 2018-12- 2019-06- IBRD / 86750 Post Consultant Open 37,000.00 3,258.11 Signed 2018-03-21 Diagnósito de de Género -40 System 01 27 07 06 07 06 Selection hs. UY-ANEP-55153-CS-INDV / Individual 2 Investigadores para el Monitoring and Evaluation 2018-06- 2018-05- 2018-09- 2018-05- 2018-12- 2018-06- 2018-12- 2019-06- IBRD / 86750 Post Consultant Open 51,000.00 3,233.58 Signed 2018-03-22 proyecto de Investigación " System 01 21 11 28 13 07 13 07 Selection Diagnóstico de Género ". UY-ANEP-55396-CS-INDV- INFORMATICO 2018 / Individual 2018-04- 2018-05- 2018-06- 2018-05- 2018-06- 2018-06- 2019-01- 2022-05- Informático para UCP - IBRD / 86750 Early Education Post Consultant Open 70,000.00 963.51 Signed 2018-03-22 13 11 07 20 07 01 01 31 Contrato mayo 2018 - mayo Selection 2022 UY-ANEP-55399-CS-INDV- MESA AYUDA 2018 / 2 Individual 2018-04- 2018-05- 2018-05- 2018-06- 2018-07- 2022-05- Asistentes Técnicos para IBRD / 86750 Early Education Post Consultant Open 194,000.00 3,650.28 Signed 2018-03-22 12 11 20 01 25 31 soporte Mesa de Ayuda Selection Plataforma Gurí. UY-ANEP-58036-CS-INDV-G FRIGERIO / CONSULTOR Graciela Frigerio. Visitas a Individual Escuelas TC y 2 Conferencias Monitoring and Evaluation 2018-04- 2018-04- 2018-04- 2018-05- 2018-05- 2018-05- 2018-07- 2018-09- 2018-09- IBRD / 86750 Post Consultant Direct 3,000.00 3,000.00 Completed 2018-04-10 para Directores y Maestros System 18 12 20 11 21 31 12 29 29 Selection nuevos de ETC. Tema: "Gestión y Organización educativa de las Escuelas" Page 10 UY-ANEP-59853-CS-INDV- Individual AS ELECTRICOS 2018 / 5 Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 20,100.00 0.00 2018-04-18 Asesores Técnicos Eventuales System Implementation 18 18 18 28 Selection - Ingenieros Eléctricos UY-ANEP-59854-CS-INDV- Individual AS CIVILES 2018 / 5 Asesores Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 35,000.00 0.00 2018-04-18 Técnicos Eventuales - System Implementation 18 18 18 28 Selection Ingenieros Civiles UY-ANEP-59855-CS-INDV- Individual AS SANITARIOS 2018 / 5 Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 11,800.00 0.00 2018-04-18 Asesores Técnicos Eventuales System Implementation 18 18 18 28 Selection - Ingenieros Sanitarios UY-ANEP-59857-CS-INDV- Individual AS AGRIMENSOR 2018 / 5 Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 5,000.00 0.00 2018-04-18 Asesores Técnicos Eventuales System Implementation 18 18 18 28 Selection - Ingenieros Agrimensores UY-ANEP-59858-CS-INDV- Individual METRAJISTAS 2018 / 5 Monitoring and Evaluation Under 2018-04- 2018-04- 2018-04- 2018-12- IBRD / 86750 Post Consultant Limited 4,000.00 0.00 2018-04-18 Asesores Técnicos Eventuales System Implementation 18 18 18 28 Selection - Metrajistas UY-ANEP-59860-CS-INDV- Individual AS ACUSTICO 2018 / 1 Asesor Monitoring and Evaluation 2018-03- 2018-08- 2018-03- 2018-08- 2018-04- 2018-09- 2018-07- 2018-10- IBRD / 86750 Post Consultant Limited 3,200.00 3,529.88 Signed 2018-08-01 Técnico Eventual - Ac. System 05 06 09 13 09 03 05 03 Selection Acústico UY-ANEP-63169-CS-INDV- ING-COLON 2018 / ING. CARLOS COLON. Asesoría Individual Monitoring and Evaluation 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- técnica por modificación IBRD / 86750 Post Consultant Direct 1,300.00 1,094.19 Signed 2018-05-17 System 17 19 28 11 10 12 proyecto de estructura en la Selection Escuela N° 8 de Fraile Muerto, Cerro Largo UY-ANEP-63185 CS INDV Individual DISEN GRAF 2018 / Diseñador Monitoring and Evaluation 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-09- IBRD / 86750 Post Consultant Limited 1,200.00 1,964.51 Signed 2018-05-17 de Catálogo Colección System 17 28 01 29 13 30 28 Selection Andariega UY-ANEP-66203-CS-INDV- ARQ SPOSITO 2018 / Contratación de la Arq. María Individual Monitoring and Evaluation 2018-05- 2018-06- 2018-05- 2018-06- 2018-11- 2018-07- 2019-02- 2018-08- Spósito para el metraje y IBRD / 86750 Post Consultant Direct 1,900.00 1,455.20 Signed 2018-06-11 System 15 13 10 22 29 06 07 06 presupuesto de nueva Selection propuesta arquitectónica de la Escuela N° 41 de Montevideo UY-ANEP-66204-CS-INDV- ING MOLINOLO / Contratación Individual Asesoría Técnica Proyecto Monitoring and Evaluation 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-09- 2018-08- IBRD / 86750 Post Consultant Direct 3,400.00 2,728.49 Signed 2018-06-11 sanitario de la nueva System 11 13 11 22 06 05 06 Selection propuesta arquitectónica de la Escuela 41 de Montevideo. UY-ANEP-66205-CS-INDV- ING LOPEZ / Contratación Asesoría Técnica Ing. Gonzalo Individual Monitoring and Evaluation 2018-05- 2018-06- 2018-05- 2018-06- 2018-07- 2019-03- 2018-08- López por proyecto eléctrico IBRD / 86750 Post Consultant Direct 6,600.00 5,559.66 Signed 2018-06-11 System 09 13 18 22 06 20 06 de la nueva propuesta Selection arquitectónica de la Escuela 41 de Montevideo UY-ANEP-66206-CS-INDV- AS-ELECT 2018 / Individual 2018-06- 2018-07- 2018-07- 2018-08- 2018-07- 2018-08- 2018-11- 2022-05- Contratación de un Técnico IBRD / 86750 Early Education Post Consultant Open 115,000.00 0.03 Signed 2018-06-11 11 27 30 05 30 17 20 16 Electricista para UCP período Selection agosto 2018 - mayo 2022 UY-ANEP-66208-CS-INDV- AS-SANIT 2018 / Individual 2018-06- 2018-07- 2018-08- 2018-08- 2018-08- 2018-08- 2018-11- 2022-05- Contratación Asesor Técnico IBRD / 86750 Early Education Post Consultant Open 115,000.00 107,237.13 Signed 2018-06-11 11 27 06 05 06 17 19 16 Sanitario para UCP agosto Selection 2018 - mayo 2022 UY-ANEP-68128-CS-INDV- ARQ-D-OBRAS2018 / Individual Directores de Obra para las 2018-08- 2018-09- 2019-08- 2018-09- 2019-12- 2018-09- 2019-12- 2022-05- IBRD / 86750 Early Education Post Consultant Open 250,000.00 47,003.59 Signed 2018-06-26 obras a llevarse a cabo desde 09 01 20 10 30 18 30 31 Selection 2018 al 2022. Se estima 24 Directores de Obra. UY-ANEP-78959-CS-INDV- Individual CHOFER 2018 / Contratación Under 2019-08- 2018-10- 2018-11- 2018-12- 2022-05- IBRD / 86750 Early Education Post Consultant Open 45,000.00 0.00 2018-09-20 de un Chófer para UCP Implementation 13 21 10 18 31 Selection período 2018-2022 UY-ANEP-90275-CS-INDV- M SOUTO 2019 / Servicio de Consultoría para realizar un Individual espacio de formación con Monitoring and Evaluation 2018-12- 2018-12- 2018-12- 2019-02- 2019-03- 2019-03- 2019-07- 2019-10- 2019-10- IBRD / 86750 Post Consultant Direct 8,100.00 8,000.00 Completed 2018-12-10 integrantes del equipo, System 10 10 10 28 20 10 29 30 30 Selection Formadores y Coordinadores del Componente Formación en Servicio del PAEPU UY-ANEP-98323-CS-INDV- DORA RIESTRA 2019 / Contratación directa Dra. Dora Riestra, Experta de Formación Individual Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- Permanente en Ciencias del IBRD / 86750 Post Consultant Direct 3,800.00 3,000.00 Completed 2019-02-04 System 04 04 04 20 20 27 04 06 06 Lenguaje, que participará en Selection jornadas de trabajo con Equipo de Lenguaje y Formadores de PAEPU. UY-ANEP-98331-CS-INDV- PATRIC SARLE 2019 / Contratación Directa Lic. Patricia Sarlé, Profesora en Educación Preescolar, que Individual Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-05- 2019-03- 2019-05- 2019-08- 2019-08- 2019-08- participará en la IBRD / 86750 Post Consultant Direct 2,700.00 2,000.00 Completed 2019-02-03 System 05 04 06 07 20 14 16 17 17 inplementación de un espacio Selection de de formación para docentes de Inicial y Primaria, brindando dos conferencias a realizarse en agosto 2019 UY-ANEP-98337-CS-INDV-G UNTOIGLICH 2019 / Contratación Directa Psic. Gisela Untoiglich, asesoramiento y participación Individual Monitoring and Evaluation 2019-02- 2019-02- 2018-12- 2019-03- 2019-03- 2019-03- 2019-05- 2019-05- 2019-05- en el área de la Educación IBRD / 86750 Post Consultant Direct 2,700.00 2,000.00 Completed 2019-02-04 System 05 06 13 07 20 27 24 25 25 Inicial con énfasis en el Selection vínculo Familia-Escuela , reuniones con el Equipo de trabajo y autoridades, encuentros con Maestros . UY-ANEP-98342-CS-INDV- GRAC FRIGERIO 2019 / Contratación directa Dra. Graciela Frigerio que participará en encuentros de Individual Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-04- 2019-12- 2019-12- marzo a diciembre con con IBRD / 86750 Post Consultant Direct 21,400.00 14,994.00 Completed 2019-02-04 System 05 04 05 14 25 03 03 03 Equipo de PAEPU, Inspectores, Selection Directores y Maestros de ETC con el objetivo de profundizar sobre aspectos relevantes en la tarea de los docentes. UY-ANEP-98345-CS-INDV- ANA CERUTTI 2019 / Contratación directa Lic Ana Cerutti Experta en Psicomotricidad, que Individual participará en encuentros Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-10- 2019-10- IBRD / 86750 Post Consultant Direct 12,500.00 8,898.31 Completed 2019-02-04 presenciales y trabajos a System 05 04 05 07 20 21 27 31 19 Selection distancia por 7 meses entre febrero y octubre 2019 dirigido al Componente Educación Inicial, Directores, Maestros de ETC. Page 11 UY-ANEP-98347-CS-INDV- PABLO GARCIA 2019 / Contratación directa Mag Pablo García, experto en la temática de inclusión social y Individual Monitoring and Evaluation 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-09- 2019-09- 2019-09- tránsito educativo, IBRD / 86750 Post Consultant Direct 3,000.00 2,000.00 Completed 2019-02-04 System 04 04 04 04 20 01 03 05 05 participando en encuentros Selection con el equipo de gestión del PAEPU, Inspectores y Directores de ETC a realizarse en Setiembre 2019. UY-ANEP-105801-CS-INDV- ARQ DUARTE 2019 / Contratación Directa del Arq. Individual Fernando Duarte para Monitoring and Evaluation 2019-02- 2019-03- 2019-03- 2019-03- 2019-06- 2019-04- 2019-06- 2019-05- IBRD / 86750 Post Consultant Direct 1,000.00 489.23 Signed 2019-03-13 Dirección de Obra en la System 20 15 13 24 04 07 05 17 Selection Escuela N° 24 Localidad de Vichadero, Departamento de Rivera UY-ANEP-105804-CS-INDV- MARIANA GOL 2019 / Contratación de la Consultora Individual Metrajista Arq. Mariana Gol Monitoring and Evaluation 2019-02- 2019-03- 2019-06- 2019-04- 2019-06- 2019-04- 2019-07- 2019-05- IBRD / 86750 Post Consultant Direct 6,260.00 321.20 Signed 2019-03-15 para al actualización de System 20 15 04 07 28 16 19 16 Selection presupuesto de obra del Instituto de Formación en Servicio. UY-ANEP-105793-CS-INDV- Individual AS CIVILES 2019 / 5 Asesores Monitoring and Evaluation 2019-03- 2019-04- 2019-07- 2019-04- 2019-08- 2019-04- 2019-09- 2019-12- IBRD / 86750 Post Consultant Open 35,000.00 30,654.65 Signed 2019-03-22 Técnicos Eventuales - System 30 15 03 22 20 22 09 31 Selection Ingenieros Civiles UY-ANEP-105796-CS-INDV- AS ELECTRICO 2019 / 5 Individual Monitoring and Evaluation Under 2019-04- 2019-04- 2019-04- 2019-12- Asesores Técnicos Eventuales IBRD / 86750 Post Consultant Open 19,700.00 0.00 2019-03-22 System Implementation 15 22 22 31 - Ingenieros Eléctricos/ Selection Técnicos Electricistas UY-ANEP-105798-CS-INDV- AS SANITARIO 2019 / 5 Individual Asesores Técnicos Eventuales Monitoring and Evaluation Under 2019-04- 2019-04- 2019-04- 2019-12- IBRD / 86750 Post Consultant Open 11,500.00 0.00 2019-03-22 - Ingenieros/Arquitecto System Implementation 15 22 22 31 Selection /Técnico en Instalaciones Sanitarias UY-ANEP-105799-CS-INDV- Individual AS AGRIMENSO 2019 / 5 Monitoring and Evaluation 2019-03- 2019-04- 2019-06- 2019-04- 2019-07- 2019-04- 2019-08- 2019-12- IBRD / 86750 Post Consultant Open 5,000.00 1,655.71 Signed 2019-03-22 Asesores Técnicos Eventuales System 31 15 12 22 30 22 01 31 Selection - Ingenieros Agrimensores UY-ANEP-105800-CS-INDV- AS METRAJ 2019 / 5 Asesores Individual Monitoring and Evaluation Under 2019-04- 2019-04- 2019-04- 2019-12- Técnicos Eventuales - IBRD / 86750 Post Consultant Open 3,800.00 0.00 2019-03-22 System Implementation 15 22 22 31 Ingeniero/Arquitecto Selection Metrajistas UY-ANEP-109134-CS-INDV- ASIST GENERO 2019 / ASISTENTE ADMINISTRATIVO "Ayudante A" 20 horas, que Individual Monitoring and Evaluation 2019-04- 2019-06- 2019-06- 2019-07- 2019-12- 2019-07- 2019-07- 2020-07- apoyará en la estrategia de IBRD / 86750 Post Consultant Open 8,900.00 650.69 Signed 2019-04-09 System 11 11 25 09 10 27 17 26 investigación para la Selection construcción de un Plan Nacional de Igualdad de Género de ANEP. UY-ANEP-118445-CS-INDV- ALONSO-184-2019 / Contratación Arq. Alonso para Individual ajuste de metraje y Monitoring and Evaluation 2019-06- 2019-06- 2019-06- 2019-06- 2019-08- 2019-06- 2019-09- 2019-06- IBRD / 86750 Post Consultant Direct 175.00 130.25 Signed 2019-06-07 presupuestación para la Obra System 04 07 04 13 23 21 06 28 Selection en Escuela N° 184, Montevideo por cambio en el proyecto ejecutivo. UY-ANEP-121831-CS-INDV / Contratación Agrimensor Andrés Pisón para realizar la Individual asesoría en Agrimensura Monitoring and Evaluation 2019-06- 2019-07- 2019-07- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- IBRD / 86750 Post Consultant Direct 1,000.00 920.86 Signed 2019-07-08 (medición, determinación y System 04 08 01 15 30 19 01 18 Selection graficación ) de los padrones donde se ubicará la Escuela Nº 224 de Montevideo, UY-ANEP-59861-CS-INDV- Individual AS FORESTAL 2018 / 1 Asesor Monitoring and Evaluation 2018-06- 2018-06- 2018-07- 2018-08- IBRD / 86750 Post Consultant Limited 3,200.00 0.00 Canceled 2018-06-01 Técnico Eventual - Ac. System 04 11 05 06 Selection Forestal UY-ANEP-59859-CS-INDV- Individual AS TERMICO 2018 / 1 Asesor Monitoring and Evaluation 2018-08- 2018-08- 2018-09- 2018-10- IBRD / 86750 Post Consultant Limited 3,200.00 0.00 Canceled 2018-08-01 Técnico Eventual - Ac. System 06 13 03 03 Selection Térmico UY-ANEP-156786-CS-INDV- ELECT ESC 9 MDEO / Individual Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- Contratación Asesor para IBRD / 86750 Post Consultant Open 3,700.00 0.00 Canceled 2020-02-18 System 02 05 03 04 Proyecto de eléctrica para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-156789-CS-INDV- AGRIM ESC 9 MDEO / Individual Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- Contratación Asesor para IBRD / 86750 Post Consultant Open 900.00 0.00 Canceled 2020-02-18 System 02 05 03 04 Proyecto Agrimensura para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-157316-CS-INDV- CIVIL ESC320 2020 / Asesor Individual para proyecto de estructura Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 6,500.00 0.00 Canceled 2020-03-02 Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157317-CS-INDV- ELECT-ESC320-2020 / Asesor Individual para proyecto de eléctrica Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 3,700.00 0.00 Canceled 2020-03-02 Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157318-CS-INDV- SANIT ESC320-2020 / Asesor Individual para proyecto de sanitaria Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 2,200.00 0.00 Canceled 2020-03-02 Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157319-CS-INDV- AGRIM ESC320-2020 / Asesor Individual para proyecto de agrimensura Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 900.00 0.00 Canceled 2020-03-02 Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157321-CS-INDV- METRA ESC320-2020 / Individual Asesor para proyecto de Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-05- IBRD / 86750 Post Consultant Open 700.00 0.00 Canceled 2020-03-02 metraje Escuela N° 320 Barrio System 15 18 16 17 Selection Casavalle, Departamento de Montevideo UY-ANEP-157794-CS-INDV- DIR OBRA 154-2020 / Director de Obra para asesoramiento, ejecución de recaudos y dirección de las Individual obras del plan de 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2021-04- IBRD / 86750 Early Education Post Consultant Open 12,000.00 10,517.88 Signed 2020-02-05 mantenimiento de diferentes 03 09 07 25 12 01 12 01 Selection escuelas del Dep Rivera, de obras menores en la Esc 88 del mismo departamento y la dirección de obras de la Escuela 124 Tacuarembó Page 12 UY-ANEP-157795-CS-DIR OBRA 65 MDEO-2020 / Individual 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-12- Director obra para la Escuela IBRD / 86750 Early Education Post Consultant Open 11,000.00 9,407.49 Signed 2020-02-10 02 14 11 30 30 06 30 07 65 de Ciudad Vieja del Selection Departamento de Montevideo UY-ANEP-166125-CS-INDV- ARQ M. GOL 2020 / Actualización del presupuesto Individual realizado para las obras en la Monitoring and Evaluation 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-05- 2020-05- 2020-06- 2020-08- IBRD / 86750 Post Consultant Direct 200.00 192.58 Completed 2020-03-24 Escuela Nº 65 de Montevideo , System 24 24 24 22 12 12 12 01 11 Selection debido a cambios que se debieron realizar en el proyecto ejecutivo UY-ANEP-181959-CS-INDV- CIVIL ESC163 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de estructura IBRD / 86750 Post Consultant Open 6,500.00 0.00 2020-06-25 System Implementation 08 11 09 08 Escuela N° 163, Departamento Selection de Montevideo UY-ANEP-181961-CS-INDV- ELEC 163 MDEO2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de eléctrica IBRD / 86750 Post Consultant Open 3,700.00 0.00 2020-06-25 System Implementation 08 11 09 08 Escuela N° 163, Departamento Selection de Montevideo UY-ANEP-181962-CS-INDV- SANIT ESC163 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de sanitaria IBRD / 86750 Post Consultant Open 2,200.00 0.00 2020-06-25 System Implementation 08 11 09 08 Escuela N° 163, Departamento Selection de Montevideo UY-ANEP-181964-CS-INDV- AGRIM ESC163 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de agrimensura IBRD / 86750 Post Consultant Open 900.00 0.00 2020-06-25 System Implementation 08 11 09 08 Escuela N° 163, Departamento Selection de Montevideo UY-ANEP-181968-CS-INDV- Individual METRAJIS 163 2020 / Asesor Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- IBRD / 86750 Post Consultant Open 700.00 0.00 2020-06-25 para metraje Escuela N° 163, System Implementation 08 11 09 08 Selection Departamento de Montevideo UY-ANEP-182125-CS-INDV- BURGUEÑO 2020 / Ajuste del proyecto de instalación Individual Monitoring and Evaluation 2020-06- 2020-06- 2020-06- 2020-07- 2020-09- 2020-08- 2020-09- 2020-09- 2020-10- eléctrica realizado en el 2014 IBRD / 86750 Post Consultant Direct 2,200.00 1,650.69 Completed 2020-06-26 System 25 26 17 25 01 14 07 03 09 para el reciclaje del Liceo N° Selection 34 a transformarse en Formación en Servicio UY-ANEP-182162-CS-INDV- SANIT E6 TBO 2020 / Asesor Individual Monitoring and Evaluation 2020-06- 2020-07- 2020-10- 2020-07- 2020-10- 2020-08- 2020-12- 2020-09- para proyecto de sanitaria IBRD / 86750 Post Consultant Open 2,200.00 2,157.02 Signed 2020-06-26 System 26 09 19 12 19 10 09 09 Escuela N° 6, Departamento Selection de Tacuarembó UY-ANEP-182163-CS-INDV METRAJ 6 TBO 2020 / Asesor Individual Monitoring and Evaluation 2020-10- 2020-08- 2020-10- 2020-09- 2020-11- 2020-10- 2021-05- 2021-04- para proyecto de metraje IBRD / 86750 Post Consultant Open 700.00 1,970.50 Signed 2020-06-29 System 26 17 26 07 09 12 04 10 Escuela N° 6, Departamento Selection de Tacuarembó UY-ANEP-156790-CS-INDV- METRAJ ESC 9 MDEO / Individual Monitoring and Evaluation Under 2021-02- 2020-07- 2021-01- 2020-07- 2021-03- 2020-08- 2020-09- Contratación Asesor para IBRD / 86750 Post Consultant Open 700.00 0.00 2020-06-29 System Implementation 01 12 22 15 03 13 12 Proyecto de metraje para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-156783-CS-INDV- CIVIL ESC 9 MDEO / Individual Monitoring and Evaluation 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-10- 2020-09- Contratación Asesor para IBRD / 86750 Post Consultant Open 6,500.00 2,764.25 Signed 2020-06-29 System 01 12 20 15 29 13 15 12 Proyecto de estructura para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-157322-CS-INDV- CIVIL ESC161-2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de estructura IBRD / 86750 Post Consultant Open 6,500.00 0.00 2020-06-29 System Implementation 10 12 15 13 13 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-157323-CS-INDV- ELECT ESC161-2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de eléctrica IBRD / 86750 Post Consultant Open 3,700.00 0.00 2020-06-29 System Implementation 10 12 15 13 12 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-157334-CS-INDV- SANIT ESC161 2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de sanitaria IBRD / 86750 Post Consultant Open 2,200.00 0.00 2020-06-29 System Implementation 10 12 15 13 13 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-157335-CS-INDV- AGRIM ESC161 2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de agrimensura IBRD / 86750 Post Consultant Open 900.00 0.00 2020-06-29 System Implementation 07 12 15 13 13 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-157338-CS-INDV- METRA ESC161 2020 / Asesor Individual Monitoring and Evaluation Under 2021-05- 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de metraje IBRD / 86750 Post Consultant Open 700.00 0.00 2020-06-29 System Implementation 10 12 15 13 12 Escuela N° 161 Barrio Sayago, Selection Departamento de Montevideo UY-ANEP-182435-CS-INDV- CIVIL 114RIV 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de estructura IBRD / 86750 Post Consultant Open 6,500.00 0.00 2020-06-29 System Implementation 12 15 13 12 Escuela N° 114 Departamento Selection de Rivera UY-ANEP-182436-CS-INDV- ELECT 114RIV 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de eléctrica IBRD / 86750 Post Consultant Open 3,700.00 0.00 2020-06-29 System Implementation 12 15 13 12 Escuela N° 114 Departamento Selection de Rivera UY-ANEP-182438-CS-INDV- METRA 114RIV 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de metraje IBRD / 86750 Post Consultant Open 700.00 0.00 2020-06-29 System Implementation 12 15 13 12 Escuela N° 114 Departamento Selection de Rivera UY-ANEP-182439-CS-INDV- SANIT 114RIV 2020 / Asesor Individual Monitoring and Evaluation Pending 2020-07- 2020-07- 2020-08- 2020-09- para proyecto de sanitaria IBRD / 86750 Post Consultant Open 2,200.00 0.00 2020-06-29 System Implementation 12 15 13 12 Escuela N° 114 Departamento Selection de Rivera UY-ANEP-184946-CS-INDV- INST BOMBERO2020 / Individual Monitoring and Evaluation Pending 2020-08- 2020-08- 2020-09- 2020-10- Escuelas 6 de Tacuarembó - IBRD / 86750 Post Consultant Open 3,400.00 0.00 2020-07-27 System Implementation 09 12 10 10 Asesor de instalaciones de Selection protección contra incendios UY-ANEP-185628-CS-INDV- INST BOMBEROS2020 / Individual Escuelas 224 Y 9 de Monitoring and Evaluation Under 2020-11- 2020-08- 2020-11- 2020-08- 2020-11- 2020-09- 2020-10- IBRD / 86750 Post Consultant Open 6,700.00 0.00 2020-07-27 Montevideo - Asesor de System Implementation 03 09 13 12 23 10 10 Selection instalaciones de protección contra incendios UY-ANEP-185632-CS-INDV- INST BOMBEROS2020 / Individual Escuela 301 Marindia Monitoring and Evaluation Pending 2020-08- 2020-08- 2020-09- 2020-10- IBRD / 86750 Post Consultant Open 3,400.00 0.00 2020-07-27 Canelones - Asesor de System Implementation 09 12 10 10 Selection instalaciones de protección contra incendios UY-ANEP-185633-CS-INDV- INST BOMBEROS2020 / Individual Monitoring and Evaluation Pending 2020-08- 2020-08- 2020-09- 2020-10- Escuela 114 de Rivera - IBRD / 86750 Post Consultant Open 3,400.00 0.00 2020-07-27 System Implementation 09 12 10 10 Asesor de instalaciones de Selection protección contra incendios Page 13 UY-ANEP-185634-CS-INDV- INST BOMBEROS2020 / Individual Monitoring and Evaluation Under 2021-05- 2020-08- 2020-08- 2020-09- 2020-10- Escuela 161 Montevideo - IBRD / 86750 Post Consultant Open 3,400.00 0.00 2020-07-27 System Implementation 10 09 12 10 10 Asesor de instalaciones de Selection protección contra incendios UY-ANEP-185649-CS-INDV- SANITARIO 2020 / Escuelas 131, 151 Mdeo y 9 Colonia - Individual Monitoring and Evaluation 2020-08- 2020-08- 2020-09- 2020-10- Contratación de un Consultor IBRD / 86750 Post Consultant Open 6,600.00 0.00 Canceled 2020-07-27 System 09 12 10 10 para Proyecto de sanitaria en Selection las obras en las Escuelas de referencia UY-ANEP-190084-CS-INDV- PSICOMETRIA 2020 / Individual Monitoring and Evaluation Under 2020-10- 2020-09- 2020-10- 2020-09- 2020-10- 2021-03- Consultor en Piscometría con IBRD / 86750 Post Consultant Open 12,000.00 0.00 2020-08-24 System Implementation 13 14 19 16 02 31 especialización en medición Selection de aprendizajes UY-ANEP-193305-CS-CDS- LIC NUTRICION / Licenciada Isabel Aldabe - Consultor especializado en Nutrición Individual para contribuir a mejorar y Monitoring and Evaluation 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2021-09- IBRD / 86750 Post Consultant Direct 29,000.00 2,455.79 Signed 2020-09-10 fortalecer el Programa de System 09 10 10 26 30 30 30 Selection Alimentación Escolar (PAE) en los aspectos relacionados con la eficiencia, eficacia y profesionalización del mismo. UY-ANEP-197261-CS-INDV RAPETTI 2020 / Ajuste proyecto de Calculo y estructura realizado en el año 2014 por el Ing. Daniel Individual Monitoring and Evaluation 2020-09- 2020-09- 2020-09- 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2020-12- Rapetti para el reciclaje del IBRD / 86750 Post Consultant Direct 1,500.00 1,353.03 Completed 2020-09-30 System 30 30 30 30 03 30 17 31 11 Liceo N° 34 a transformarse Selection en el Instituto de Formación en Servicio, por cambios solicitados por la Unidad de Protección de Patrimonio. UY-ANEP-218444-CS-INDV CIVIL 5 FLORIDA / Asesor para Individual Monitoring and Evaluation Pending 2021-02- 2021-03- 2021-04- 2021-05- Proyecto de estructura para la IBRD / 86750 Post Consultant Open 6,500.00 0.00 2021-02-15 System Implementation 28 03 01 01 Escuela 5 Florida, Selection Departamento FLORIDA UY-ANEP-218446-CS-INDV AGRIM 5 FLORIDA / Asesor Individual Monitoring and Evaluation Pending 2021-02- 2021-03- 2021-04- 2021-05- para proyecto de agrimensura IBRD / 86750 Post Consultant Open 900.00 0.00 2021-02-15 System Implementation 28 03 01 01 Escuela N° 5 Florida, Selection Departamento de FLORIDA UY-ANEP-218447-CS-INDV- METRAJE 5 FLORIDA / Asesor Individual Monitoring and Evaluation Pending 2021-02- 2021-03- 2021-04- 2021-05- para metraje Escuela N° 5 IBRD / 86750 Post Consultant Open 700.00 0.00 2021-02-15 System Implementation 28 03 01 01 Florida, Departamento de Selection FLORIDA UY-ANEP-218448-CS-INDV CIVIL 131 MDEO / Asesor para Individual Monitoring and Evaluation Under 2021-04- 2021-05- 2021-05- 2021-06- 2021-07- Proyecto de estructura para la IBRD / 86750 Post Consultant Open 6,500.00 0.00 2021-04-30 System Implementation 21 13 16 14 14 Escuela 131 Departamento de Selection Montevideo UY-ANEP-218449-CS-INDV Individual METRAJE 131 MDEO / Asesor Monitoring and Evaluation Under 2021-05- 2021-05- 2021-05- 2021-06- 2021-07- IBRD / 86750 Post Consultant Open 700.00 0.00 2021-04-30 para metraje Escuela N° 131 System Implementation 07 13 16 14 14 Selection Departamento de Montevideo UY-ANEP-218451-CS-INDV CIVIL 4 MDEO / Asesor para Individual Monitoring and Evaluation 2021-06- 2021-05- 2021-05- 2021-06- 2021-07- Proyecto de estructura para la IBRD / 86750 Post Consultant Open 6,500.00 0.00 Under Review 2021-04-30 System 18 13 16 14 14 Escuela 4 Departamento de Selection Montevideo UY-ANEP-218452-CS-INDV Individual METRAJE 4 MDEO / Asesor Monitoring and Evaluation Pending 2021-05- 2021-05- 2021-06- 2021-07- IBRD / 86750 Post Consultant Open 700.00 0.00 2021-04-30 para metraje Escuela N° 4 System Implementation 13 16 14 14 Selection Departamento de Montevideo UY-ANEP-218453-CS-INDV BOMBERO 2 R.NEGRO / Asesor Individual de instalaciones de protección Monitoring and Evaluation Pending 2021-08- 2021-08- 2021-09- 2021-10- IBRD / 86750 Post Consultant Open 3,400.00 0.00 2021-08-02 contra incendios Escuela N° 2 System Implementation 15 18 16 16 Selection Fray Bentos, Departamento de Río Negro. UY-ANEP-222791-CS-CDS- COORD GRAL 2021-22 / Contratación de la Monitoring and Evaluation 2020-12- 2020-12- 2020-12- 2021-01- 2021-01- 2022-05- Coordinadora General para el IBRD / 86750 Post Direct Selection Direct 65,000.00 32,823.31 Signed 2020-12-15 System 15 15 15 25 25 31 Proyecto, designada por las Autoridades del CODICEN previsto hasta mayo 2022 UY-ANEP-228349-CS-CDS- COORD FS 2021-2022 / Individual Monitoring and Evaluation Under 2021-04- 2021-04- 2021-05- 2021-05- 2022-05- Coordinador del Componente IBRD / 86750 Post Consultant Open 43,000.00 0.00 2021-04-12 System Implementation 15 23 03 03 31 Formación en Servicio desde Selection abril 2021 a mayo 2022 UY-ANEP-156787-CS-INDV- SANIT ESC 9 MDEO / Individual Monitoring and Evaluation 2020-07- 2020-07- 2020-08- 2020-09- Contratación Asesor para IBRD / 86750 Post Consultant Open 2,200.00 0.00 Canceled 2020-06-29 System 12 15 13 12 Proyecto de sanitaria para la Selection Escuela 9 La Teja, Montevideo UY-ANEP-234484-CS-INDV CIVIL 9 DURAZNO / Cateo, Individual Monitoring and Evaluation Under 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- análisis y diagnóstico IBRD / 86750 Post Consultant Open 3,500.00 0.00 2021-06-01 System Implementation 27 14 17 16 16 estructural de los perfiles del Selection techo del local escolar. UY-ANEP-234523-CS-INDV LUIS BELORA 2021 / Especialista en discapacidad intelectual- 9 jornadas con Individual Formadores del Componente Monitoring and Evaluation Under 2021-05- 2021-05- 2021-05- 2021-05- 2021-12- IBRD / 86750 Post Consultant Direct 3,300.00 0.00 2021-05-17 3 de PAEPU y maestros , System Implementation 27 17 24 24 31 Selection directores e inspectores de Educación Primaria de ETC, con énfasis en el rezago y la transición . UY-ANEP-234486-CS-INDV A, CERUTTI 2021 / Contratación directa experta en psicomotricidad que Individual Monitoring and Evaluation Under 2021-05- 2021-05- 2021-05- 2021-05- 2021-12- participara en 10 jornadas IBRD / 86750 Post Consultant Direct 8,600.00 0.00 2021-05-17 System Implementation 27 17 24 24 31 entre los meses de mayo a Selection diciembre 2021 dirigido a Inspectores, Directores y maestros de ETC. Page 14 PLAN DE PASSATION DE MARCHÉS (Texte) Information sur le Projet : Haiti, Projet de Protection Sociale Adaptative pour une Résilience Accrue (PSARA) Agence d’exécution du Projet : Unite de Gestion des Projets (MAST) Date du plan de passation des marchés : 24 mai 2021 Période couverte par ce plan de passation des marchés : 2021 à 2023 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”), révisé le 1er novembre 2017 et le 1er août 2018, le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés: En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. sans objet Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. sans objet Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Sans objet Autres informations pertinentes sur la passation des marchés Sans Objet PROCUREMENT Haiti : Adaptive Social Protection for Increased Resilience Project PLAN General Information Country: Haiti Bank’s Approval Date of the Original Procurement Plan: 2021-05-24 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174111 GPN Date: Project Name: Adaptive Social Protection for Increased Resilience Project Loan / Credit No: IDA / D7750 Project Management Unit of the Ministry of Social Affairs and Labor Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UGP-MAST-C1-PH1-GO-RFQ- Establishing the Foundations Request for Single Stage - One 001REF-10 / EQUIPEMENTS IDA / D7750 for an Adaptive Social Post Limited 0.00 Canceled 2021-05-26 2021-07-21 2022-01-17 Quotations Envelope INFORMATIQUES Protection System UGP-MAST-C1-PH1-GO-RFQ- Pending Project Management, Request for Single Stage - One 001REF-5 / EQUIPEMENTS IDA / D7750 Post Open - National 0.00 Implementati 2021-04-06 2021-06-01 2021-11-28 Monitoring and Evaluation Quotations Envelope INFORMATIQUES on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UGP-MAST-C1-PH1-CS- QCBS-001REF-6 / Establishing the Foundations Quality And Cost- Developpement du systeme IDA / D7750 for an Adaptive Social Post Open - National 0.00 Canceled 2021-12-01 2021-12-22 2022-02-04 2022-03-04 2022-04-03 2022-05-08 2022-06-12 2023-06-12 Based Selection d'information et de paiements Protection System pour le MAST UGP-MAST-C1-PH1-CS- QCBS-001REF-8 / COLLECTE Project Management, Quality And Cost- IDA / D7750 Post Open - National 0.00 Canceled 2021-05-24 2021-06-14 2021-07-28 2021-08-25 2021-09-24 2021-10-29 2021-12-03 2022-12-03 DE DONNÉES LIGNE DE BASE Monitoring and Evaluation Based Selection EVALUATION D'IMPACT UGP-MAST-C1-PH1-CS- Establishing the Foundations Quality And Cost- QCBS-001REF-7 / IDA / D7750 for an Adaptive Social Post Open - National 0.00 Canceled 2021-06-01 2021-06-22 2021-08-05 2021-09-02 2021-10-02 2021-11-06 2021-12-11 2022-12-11 Based Selection Communication Protection System UGP-MAST-C1-PH1-CS- QCBS-001REF-4 / Establishing the Foundations Quality And Cost- Pending Developpement du systeme IDA / D7750 for an Adaptive Social Prior Open - International 0.00 2021-06-08 2021-06-29 2021-08-12 2021-09-09 2021-10-09 2021-11-13 2021-12-18 2022-12-18 Based Selection Implementation d'information et de paiements Protection System pour le MAST UGP-MAST-C1-PH1-CS- Project Management, Quality And Cost- Under QCBS -001REF-7 / LIGNE DE IDA / D7750 Post Open - International 0.00 2021-06-08 2021-06-18 2021-06-29 2021-08-12 2021-09-09 2021-10-09 2021-11-13 2021-12-18 2022-12-18 Monitoring and Evaluation Based Selection Implementation BASE EVALUATION D'IMPACT UGP-MAST-C1-PH1-CS- QCBS-001REF-11 / Establishing the Foundations Quality And Cost- Pending COMMUNICATION - IDA / D7750 for an Adaptive Social Post Open - National 0.00 2021-06-01 2021-06-22 2021-08-05 2021-09-02 2021-10-02 2021-11-06 2021-12-11 2022-12-11 Based Selection Implementation Conception de la Stratégie de Protection System Communication pour le MAST UGP-MAST-C1-PH1-CS- QCBS-001REF-9 / SUIVI PAR Project Management, Quality And Cost- Under IDA / D7750 Post Open - National 0.00 2021-05-21 2021-06-18 2021-06-11 2021-07-25 2021-08-22 2021-09-21 2021-10-26 2021-11-30 2022-11-30 AGENCE TIERCE / TIERCE Monitoring and Evaluation Based Selection Implementation PARTIE INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UGP-MAST-C1-PH1-CS-CDS- Delivering an Adaptive Social 001REF-1 / Filet de protection IDA / D7750 Prior Direct Selection Direct 0.00 Canceled 2021-05-20 2021-05-30 2021-08-03 2022-01-30 Safety Net sociale phase 1 et 2 UGP-MAST-C1-PH2-CS-CDS- Individual 001REF-2 / CONSULTANT EN Project Management, Pending IDA / D7750 Post Consultant Open 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 GESTION ADMINISTRATIVE ET Monitoring and Evaluation Implementation Selection FINANCIERE UGP-MAST-C1-PH2-CI-CDS- Individual 001REF-3 / CONSULTANT Project Management, IDA / D7750 Post Consultant Open 0.00 Under Review 2021-04-01 2020-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 SPECIALISTE EN PASSATION DE Monitoring and Evaluation Selection MARCHES Page 1 UGP-MAST-C1-PH1-CS-CQS- Individual 001REF-19 / RECRUTEMENT Project Management, Pending IDA / D7750 Post Consultant Open 0.00 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 D'UN CONSULTANT - Monitoring and Evaluation Implementation Selection COORDONNATEUR PROJET UGP-MAST-C1-PH1-CS-CQS- Individual 001REF-20 / RECRUTEMENT Project Management, Under IDA / D7750 Post Consultant Open 0.00 2021-04-01 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 D'UN CONSULTANT - Monitoring and Evaluation Implementation Selection SPECIALISTE EN OPERATIONS UGP-MAST-C1-PH1-CS-CQS- Individual 001REF-21 / RECRUTEMENT Project Management, Under IDA / D7750 Post Consultant Open 0.00 2021-04-01 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 D'UN CONSULTANT - Monitoring and Evaluation Implementation Selection CONSEILLER TECHNIQUE UGP-MAST-C1-PH1-CS-CQS- 001REF-22 / RECRUTEMENT Individual Project Management, D'UN CONSULTANT - IDA / D7750 Post Consultant Open 0.00 Under Review 2021-04-01 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 Monitoring and Evaluation SPECIALISTE EN SUIVI ET Selection EVALUATION UGP-MAST-C1-PH1-CS-CDS- 001REF / Filet de protection Delivering an Adaptive Social IDA / D7750 Prior Direct Selection Direct 0.00 Under Review 2021-03-01 2021-06-18 2021-03-11 2021-03-11 2021-05-15 2021-11-11 sociale Phase 1 (contrat avec Safety Net le PAM) UGP-MAST-C1-PH1-CI-CQS- 001REF-24 / RECRUTEMENT D'UN CONSULTANT Individual Project Management, INDIVIDUEL - IDA / D7750 Post Consultant Open 0.00 Under Review 2021-04-01 2021-04-01 2021-05-20 2021-06-10 2021-07-15 2022-01-11 Monitoring and Evaluation COORDONNATEUR Selection DEPARTEMENTAL DE PROJET GRAND-ANSE Page 2 PLAN DE PASSATION DE MARCHÉS Information sur le Projet : BURKINA FASO : Projet D’urgence de Développent Local et de Résilience (P175382) Agence d’exécution du Projet : PUDTR Date du plan de passation des marchés : Octobre 2020 Période couverte par ce plan de passation des marchés : Octobre 2020 à Septembre 2021 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016 révisé en Juillet et Août 2020) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, au cas où la procédure de passation des marché est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics (Décret no 207- 0049/PRES/PM/MINEFID portant procédures de passation, d’exécution et de règlement des marchés publics et des délégations de service public), ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : - Contrôle a priori des structures de contrôle des marchés publics (DCMEF et DGCMEF) et autorisations sur les ententes directes : Non applicable; -Seuils nationaux de passation de marchés : Non applicable -Rejet de l’offre anormalement inférieure ou supérieure de 15 % de la moyenne du montant prévisionnel du client et de la moyenne des offres conformes : Non applicable - Application selon le financement de la marge de préférence nationale, communautaire et locale (collectivités locales) : Non applicable -Signature d’un nouveau marché pour donner suite à une variation du montant du marché de plus de 30 % du montant initial; Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés : « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés : « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas Travaux ne s’applique pas L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique. Autres informations pertinentes sur la passation des marchés Néant. SEUILS POUR LES METHODES DE PASSATION ET MARCHES 1. TRAVAUX, FOURNITURES ET SERVICES AUTRE QUE SERVICES DE CONSULTANTS Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES (US$ TRAVAUX (US$ équivalent) équivalent) AOI AON CFEN AOI AON CF ≥10.000.0 <10.000.0 <1.00.0 ≥1.000.0 <1.000.0 <500.0 00 00 00 00 00 00 2. SELECTION DE CONSULTANTS - Liste restreinte composée entièrement de firmes nationales: La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’investissement (FPI) - Passation des Marchés de fournitures, de travaux et de services (autres que les services de consultants) et Services de Consultants, Juillet 2016, révisés en novembre 2017 et Août 2018 et l’Emprunteur ne procède pas à une publication dans UNDB. - Autre arrangement spécial de Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; PROCUREMENT Burkina Faso : Burkina Faso Emergency Local Development and Resilience Project PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2021-04-19 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175382 GPN Date: Project Name: Burkina Faso Emergency Local Development and Resilience Project Loan / Credit No: IDA / D7610 Emergency Local Development and Resilience Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BF-PUDTR-236209-CW-RFQ / Réalisation de 57 travaux de foration dans les communes Request for Pending Improved access to basic Request for Single Stage - One 2021-08- de Bogandé (10), de Mani (3), IDA / D7610 Post Limited Quotations (Non 513,000.00 0.00 Implementat 2021-06-20 2021-07-17 social services Quotations Envelope 01 de Coalla (15), de Solenzo (5), Bank-SPD) ion de Sanaba (14) et de Bomborokuy (10) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PUDTR-228690-GO-RFQ Pending Community Engagement and Request for Single Stage - One / Installation et fourniture de IDA / D7610 Post Limited 24,000.00 0.00 Implementati 2021-05-05 2021-06-07 2021-07-09 Project Management Quotations Envelope connexion internet haut débit on BF-PUDTR-228691-GO-RFQ Pending Community Engagement and Request for Single Stage - One / Acquisition d'équipement et IDA / D7610 Post Limited 100,100.00 0.00 Implementati 2021-05-05 2021-06-08 2021-07-14 Project Management Quotations Envelope mobilier de bureau on BF-PUDTR-229534-GO-RFQ Pending Community Engagement and Request for Single Stage - One / Acquisition de fournitures IDA / D7610 Post Limited 63,800.00 0.00 Implementati 2021-04-25 2021-05-27 2021-06-26 Project Management Quotations Envelope de bureau au profit du PUDTR on BF-PUDTR-229540-GO-RFQ Pending / Acquisition de matériels Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 90,200.00 0.00 Implementati 2021-04-25 2021-05-27 2021-07-11 informatique et bureautique Project Management Quotations Envelope on au profit du PUDTR BF-PUDTR-237107-GO-DIR / L’acquisition du matériel Pending roulant au profit du Projet Community Engagement and IDA / D7610 Post Direct Selection Direct 200,000.00 0.00 Implementati 2021-06-10 2021-06-15 2021-07-20 2021-10-18 d’Urgence de Développement Project Management on Territorial et de Résilience (PUDTR) BF-PUDTR-237128-GO-RFQ Pending Community Engagement and Request for Single Stage - One / Câblage réseau informatique IDA / D7610 Post Limited 12,000.00 0.00 Implementati 2021-06-26 2021-07-28 2021-08-27 Project Management Quotations Envelope des locaux de l'UCP du PUDTR on BF-PUDTR-237132-GO-RFQ / Acquisition d'équipement de classe (tables bancs, armoires Pending Improved access to basic Request for Single Stage - One métalliques, bureaux et IDA / D7610 Post Limited 390,000.00 0.00 Implementati 2021-06-30 2021-08-25 2021-10-24 social services Quotations Envelope chaises) pour les écoles dans on le cadre de la mise en œuvre du PUDTR BF-PUDTR-237134-GO-RFQ / Acquisition de manuels Pending Improved access to basic Request for Single Stage - One scolaires, fournitures scolaires IDA / D7610 Post Limited 310,000.00 0.00 Implementati 2021-06-30 2021-08-25 2021-10-24 social services Quotations Envelope et matériels didactique dans on le cadre du PUDTR BF-PUDTR-238993-GO-RFQ Pending / Acquisition de carburant Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 120,500.00 0.00 Implementati 2021-07-05 2021-08-05 2021-08-20 pour les activités de mise en Project Management Quotations Envelope on oeuvre du PUDTR NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PUDTR-229549-NC-RFQ Pending / L’acquisition des services de Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 10,000.00 0.00 Implementati 2021-05-05 2021-06-05 2021-07-05 gardiennage des locaux de Project Management Quotations Envelope on l’UGP du PUDTR BF-PUDTR-229551-NC-RFQ Pending / L’acquisition des services de Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 12,000.00 0.00 Implementati 2021-05-05 2021-06-05 2021-07-05 nettoyage et d'entretien des Project Management Quotations Envelope on locaux de l’UGP BF-PUDTR-228653-NC-DIR / Pending L’acquisition d'une police Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 70,000.00 0.00 Implementati 2021-05-20 2021-07-15 2022-01-11 d'assurance maladie au profit Project Management Quotations Envelope on du personnel UGP BF-PUDTR-232913-NC-RFQ Pending Community Engagement and Request for Single Stage - One / Assurance de matériels IDA / D7610 Post Limited 18,000.00 0.00 Implementati 2021-07-15 2021-09-09 2022-03-08 Project Management Quotations Envelope roulants on Page 1 BF-PUDTR-237122-NC-RFQ / Acquisition de service de Pending Community Engagement and Request for Single Stage - One transit des véhicules issus de IDA / D7610 Post Limited 36,000.00 0.00 Implementati 2021-07-25 2021-08-25 2021-09-24 Project Management Quotations Envelope l'accord cadre entre le PUDTR on et l'UNOPS BF-PUDTR-238989-NC-RFQ Under / Acquisition, installation et Community Engagement and IDA / D7610 Post Direct Selection Direct 70,000.00 0.00 Implementati 2021-06-21 2021-06-17 2021-06-26 2021-07-25 2021-09-08 suivi du logiciel de gestion Project Management on Tom²pro au profit du PUDTR CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PUDTR-228649-CS-LCS / Community Engagement and Least Cost Under Recrutement d'un cabinet IDA / D7610 Post Open - National 90,000.00 0.00 2021-04-30 2021-04-26 2021-05-21 2021-07-04 2021-08-01 2021-08-31 2021-10-05 2021-11-09 2022-05-08 Project Management Selection Implementation pour l'audit du projet BF-PUDTR-229596-CS-CQS / Etude d'actualisation pour la réalisation de 223 nouvell infrast dans la BM (173) et à l'Est (50) soit 27CSPS, 20CEG, Consultant Improved access to basic Under 5Complex, 20CEG, 2lycé, IDA / D7610 Post Qualification Limited 276,460.00 0.00 2021-05-01 2021-04-27 2021-05-11 2021-05-16 2021-05-28 2021-07-27 social services Implementation 5Complex, 1Salle Poly, Selection 125boutiq, 22peri mar, 6marchés, 4gare, 2maga, 3air d'aba, 2hangar, 2Hall et 2parc de vacc BF-PUDTR-229517-CS-CQS / Etude d'actualisation relatif à la normalisation de 314 infrastructures sociales dans Consultant la région de la Boucle du Improved access to basic Under IDA / D7610 Post Qualification Limited 124,650.00 0.00 2021-04-30 2021-04-27 2021-05-05 2021-05-10 2021-05-22 2021-06-21 Mouhoun (281) et de l’Est (33) social services Implementation Selection soit 209 salles de classe, 57 forages, 24 latrines, 9 clôtures, .6 Bâtiments, 6 CSPS et 3 CEG. BF-PUDTR-236192-CS-CQS / Recrutement d’ONG en appui Consultant à la mise en œuvre des Community Engagement and Under IDA / D7610 Post Qualification Open - National 200,000.00 0.00 2021-06-04 2021-05-07 2021-06-25 2021-08-08 2021-09-07 2021-10-12 2022-04-10 activités de prévention et Project Management Implementation Selection réponse aux violences basées sur le genre(VBG)/EAS/HS du PUDTR BF-PUDTR-236206-CS-CQS / Etudes étude d'impact Consultant Improved access to basic Under environnemental et social de IDA / D7610 Post Qualification Limited 72,000.00 0.00 2021-08-30 2021-06-14 2021-09-06 2021-09-13 2021-09-30 2021-12-29 social services Implementation la réalisation de 400 pistes Selection rurales BF-PUDTR-236195-CS-CQS / Etudes techniques et suivi- Consultant contrôle des travaux de Improved access to basic Under IDA / D7610 Post Qualification Limited 270,000.00 0.00 2021-06-04 2021-06-04 2021-06-11 2021-06-18 2021-07-05 2021-10-03 réalisation de neuf (09) social services Implementation Selection systèmes d’adduction en eau potable simplifiée (AEPS) BF-PUDTR-237117-CS-CQS / Etudes techniques et suivi- Improve Physical and Virtual Consultant Under contrôle des travaux de IDA / D7610 Connectivity and Urban Post Qualification Limited 40,500.00 0.00 2021-06-15 2021-06-04 2021-06-22 2021-06-29 2021-07-16 2021-10-14 Implementation construction de trois (03) Resilience Selection ouvrages de franchissement BF-PUDTR-236196-CS-CQS / Etudes techniques et suivi- Consultant Community Level Economic Under contrôle des travaux IDA / D7610 Post Qualification Limited 380,000.00 0.00 2021-05-31 2021-06-04 2021-06-07 2021-06-14 2021-07-01 2021-12-28 Recovery and Empowerment Implementation d'aménagement de 380 Ha de Selection Basfonds BF-PUDTR-238341-CS-CQS / Consultant Etude technique pour la Community Level Economic Pending IDA / D7610 Post Qualification Limited 17,640.00 0.00 2021-06-30 2021-07-07 2021-07-14 2021-07-31 2021-10-29 construction d'un abattoir Recovery and Empowerment Implementation Selection moderne à Tougan BF-PUDTR-238343-CS-CQS / Etude d'impact Consultant Community Level Economic Pending environnementale et social IDA / D7610 Post Qualification Limited 20,000.00 0.00 2021-06-30 2021-07-07 2021-07-14 2021-07-31 2021-10-29 Recovery and Empowerment Implementation pour la construction d'un Selection abattoir moderne à Tougan BF-PUDTR-238350-CS-CQS / Consultant Community Level Economic Pending Réalisation de NIES pour IDA / D7610 Post Qualification Limited 20,000.00 0.00 2021-06-30 2021-07-07 2021-07-14 2021-07-31 2021-10-29 Recovery and Empowerment Implementation l'aménagement de bafonds Selection BF-PUDTR-238346-CS-CQS / Etude technique pour la réalisation des infrastructures Consultant marchandes (abattoir Community Level Economic Pending IDA / D7610 Post Qualification Limited 70,860.00 0.00 2021-06-25 2021-07-02 2021-07-09 2021-07-26 2021-10-24 moderne, laiterie, l'installation Recovery and Empowerment Implementation Selection solaire, marché sécondaire, marchés de fruits, bouchérie, 3 unités de transformation) BF-PUDTR-238279-CS-QCBS / Etudes techniques et suivi- Improve Physical and Virtual contrôle des travaux de Quality And Cost- Under IDA / D7610 Connectivity and Urban Post Open - International 800,000.00 0.00 2021-06-15 2021-06-04 2021-07-15 2021-07-23 2021-08-22 2021-08-29 2021-09-20 2021-10-19 2022-01-17 renforcement du reseau de Based Selection Implementation Resilience drainage des eaux pluiviables de la ville de Fada BF-PUDTR-236199-CS-QCBS / Etudes techniques et suivi- Improve Physical and Virtual contrôle des travaux Quality And Cost- Under IDA / D7610 Connectivity and Urban Post Open - International 3,600,000.00 0.00 2021-06-15 2021-06-04 2021-06-18 2021-07-09 2021-07-12 2021-07-19 2021-08-24 2021-09-22 2021-10-01 d'aménagement de 400 km Based Selection Implementation Resilience pistes dans le cadre de la mise en œuvre du PUDTR Page 2 BF-PUDTR-238348-CS-CQS / Etude d'adaptation Consultant infrastructures marchandes Community Level Economic Pending IDA / D7610 Post Qualification Limited 179,650.00 0.00 2021-06-30 2021-07-07 2021-07-14 2021-07-31 2021-10-29 (Aire d'abattage, marché, Recovery and Empowerment Implementation Selection hall, hangar, boutiques de rue, magasin de stokage) BF-PUDTR-238985-CS-CQS / Réalisation de 20 Notices Consultant d'Impact Environnemental et Community Level Economic Pending IDA / D7610 Post Qualification Limited 133,000.00 0.00 2021-06-25 2021-07-02 2021-07-09 2021-07-26 2021-08-25 Social (NIES) dans le cadre de Recovery and Empowerment Implementation Selection la réalisation des infrastructures marchandes BF-PUDTR-238986-CS-CQS / Consultant Etude d'identification des Community Level Economic Pending IDA / D7610 Post Qualification Limited 30,000.00 0.00 2021-07-20 2021-08-03 2021-08-13 2021-09-02 2021-11-01 opportunité d'AGR dans la Recovery and Empowerment Implementation Selection zone cible BF-PUDTR-238987-CS-CQS / Etude techniques pour la Consultant construction et équipement Community Level Economic Pending IDA / D7610 Post Qualification Limited 21,000.00 0.00 2021-07-15 2021-07-22 2021-07-29 2021-08-15 2021-11-13 de 2 centres de tissage pour Recovery and Empowerment Implementation Selection femmes à Bomborokuy et Yaba BF-PUDTR-238990-CS-CQS / Consultant Community Engagement and Under Elaboration d'un plan IDA / D7610 Post Qualification Limited 40,000.00 0.00 2021-06-25 2021-06-10 2021-07-10 2021-07-25 2021-08-11 2021-09-25 Project Management Implementation stratégique de communication Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PUDTR-238285-CS-INDV / Recrutement d’un Individual Community Engagement and Under consultant individuel pour une IDA / D7610 Post Consultant Limited 35,000.00 0.00 2021-06-10 2021-06-04 2021-06-15 2021-06-25 2021-07-12 2022-07-07 Project Management Implementation assistance Technique à l’Unité Selection de Coordination du PUDTR Page 3 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: December, 2016 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: Jan 2017 to June 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 5 High risk installation of plant and equipment and PPP) 2. (Goods; Information Technology & 1.5 High risk Non-Consulting Services) 3. Consultant Services (Firms) 0.5 High risk 4. Consultant Services (Individual 0.2 High risk Consultants) 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements: NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. January 11, 2018 9. Renewal or extension of individual consultant’s contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. January 11, 2018 PROCUREMENT Kenya : Kenya Climate Smart Agriculture Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2019-09-30 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154784 GPN Date: 2018-02-08 Project Name: Kenya Climate Smart Agriculture Project Loan / Credit No: IDA / 59450 B Executing Agency(ies): usia County WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KCSAP/BS/BKN/5/2018- 2019 / Procurement of services to construct earthen Component 1: Upscaling fish pond/earthen movement Climate-Smart Agricultural Request for Single Stage - One 2020-02- and compaction 7800m3 and IDA / 59450 Practices (US$163.8 million Post Limited 34,951.45 35,785.30 Completed 2019-06-24 2019-06-24 2019-08-19 2019-06-25 Quotations Envelope 15 Earthen Dyke construction/ equivalent, of which IDA earth movement and US$150.0 million eq uivalent) compaction 6600m3 at Wakhungu KE-BUSIA COUNTY-140900- Component 1: Upscaling CW-RFQ / Procurement of Climate-Smart Agricultural Under Request for Single Stage - One 2020-08- expansion and installation of IDA / 59450 Practices (US$163.8 million Post Limited 177,808.98 0.00 Implementat 2019-12-09 2019-06-19 2020-02-03 Quotations Envelope 01 irrigation system on changara equivalent, of which IDA ion Water pan sub-project US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-179909- Climate-Smart Agricultural CW-RFQ / construction of Request for Single Stage - One 2020-09- IDA / 59450 Practices (US$163.8 million Post Limited 84,546.74 79,374.83 Signed 2020-06-20 2020-07-31 2020-07-16 2020-09-28 Office and eatery point at Quotations Envelope 14 equivalent, of which IDA Wakhungu US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-179922- Climate-Smart Agricultural Request for Single Stage - One 2020-08- CW-RFQ / Installation of pipes IDA / 59450 Practices (US$163.8 million Post Limited 18,788.16 0.00 Canceled 2020-06-23 2020-07-14 Quotations Envelope 13 for Bukani Aquaculture park equivalent, of which IDA US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-179925- Climate-Smart Agricultural Pending CW-RFQ / Water channels, Request for Single Stage - One 2020-08- IDA / 59450 Practices (US$163.8 million Post Limited 14,091.12 0.00 Implementat 2020-06-23 2020-07-14 stone pitching and dam Quotations Envelope 13 equivalent, of which IDA ion overflow at Wakhungu US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-182333- Climate-Smart Agricultural Request for Single Stage - One 2020-11- CW-RFQ / Perimeter fencing IDA / 59450 Practices (US$163.8 million Post Limited 15,962.44 0.00 Canceled 2020-07-27 2020-08-15 Quotations Envelope 13 at Bukani Aquaculture park equivalent, of which IDA US$150.0 million eq uivalent) KE-BUSIA COUNTY-182334- Component 1: Upscaling CW-RFQ / Block two pipeline Climate-Smart Agricultural Request for Single Stage - One 2020-11- for the Changara water pan IDA / 59450 Practices (US$163.8 million Post Limited 30,114.25 28,653.67 Signed 2020-07-20 2020-10-28 2020-08-15 2020-12-15 Quotations Envelope 13 expansion and Irrigation equivalent, of which IDA system sub project US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-182335- Climate-Smart Agricultural CW-RFQ / Fencing for the Request for Single Stage - One 2020-11- IDA / 59450 Practices (US$163.8 million Post Limited 31,042.25 11,277.00 Signed 2020-07-20 2020-10-28 2020-08-06 2020-12-15 Changara water pan and Quotations Envelope 04 equivalent, of which IDA irrigation system sub project US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-182336- Climate-Smart Agricultural Request for Single Stage - One 2020-11- CW-RFQ / construction 2 IDA / 59450 Practices (US$163.8 million Post Limited 3,286.38 3,139.75 Signed 2020-07-20 2020-10-28 2020-08-08 2020-12-15 Quotations Envelope 06 doors toilet and bathroom equivalent, of which IDA US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-184637- Climate-Smart Agricultural Under Request for Single Stage - One 2021-06- CW-RFQ / water pan for the IDA / 59450 Practices (US$163.8 million Post Limited 90,000.00 0.00 Implementat 2020-08-19 2020-10-05 2020-09-23 Quotations Envelope 20 Bukani Aquaculture park equivalent, of which IDA ion US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-200914- Climate-Smart Agricultural Under CW-RFQ / construction of Request for Single Stage - One 2021-03- IDA / 59450 Practices (US$163.8 million Post Limited 73,919.65 0.00 Implementat 2020-10-26 2020-11-24 2020-11-26 poultry park hatchery in Quotations Envelope 26 equivalent, of which IDA ion bunyala South Sub county US$150.0 million eq uivalent) KE-BUSIA COUNTY-179921- Component 1: Upscaling CW-RFQ / 2.5m high Climate-Smart Agricultural Request for Single Stage - One 2020-12- perimeter fence with concrete IDA / 59450 Practices (US$163.8 million Post Limited 23,485.20 0.00 Canceled 2020-09-05 2020-09-26 Quotations Envelope 25 poles, heavy gauge barbed equivalent, of which IDA wire US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-179913- Climate-Smart Agricultural CW-RFQ / Renovation and Request for Single Stage - One 2020-08- IDA / 59450 Practices (US$163.8 million Post Limited 4,790.98 0.00 Canceled 2020-06-22 2020-07-13 core trenching of ponds at Quotations Envelope 12 equivalent, of which IDA Okerebwa US$150.0 million eq uivalent) KE-BUSIA COUNTY-167109- Component 1: Upscaling CW-RFQ / construction of Climate-Smart Agricultural Request for Single Stage - One 2020-11- indigenous production park at IDA / 59450 Practices (US$163.8 million Post Limited 124,212.92 0.00 Canceled 2020-04-05 2020-05-31 Quotations Envelope 27 Bunyala North and Teso South equivalent, of which IDA central production unit US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-200931- Climate-Smart Agricultural Under CW-RFQ / construction of Request for Single Stage - One 2021-05- IDA / 59450 Practices (US$163.8 million Post Limited 73,919.65 0.00 Implementat 2020-11-02 2020-11-24 2020-11-26 poultry parks in Teso South Quotations Envelope 25 equivalent, of which IDA ion Sub county US$150.0 million eq uivalent) Page 1 KE-BUSIA COUNTY-200479- CW-RFQ / Borehole drilling , Component 1: Upscaling installation of solar hybrid Climate-Smart Agricultural Request for Single Stage - One 2021-05- pumping system, erection of IDA / 59450 Practices (US$163.8 million Post Limited 45,131.10 40,681.89 Completed 2020-11-02 2020-12-01 2020-11-26 2020-12-28 Quotations Envelope 25 storage tank and construction equivalent, of which IDA of communal water kiosk for US$150.0 million eq uivalent) Teso South sub county KE-BUSIA COUNTY-200942- CW-RFQ / Borehole drilling, Component 1: Upscaling installation of solar hybrid Climate-Smart Agricultural Request for Single Stage - One 2021-05- pumping system, erection of IDA / 59450 Practices (US$163.8 million Post Limited 45,131.10 40,609.11 Completed 2020-11-02 2020-12-01 2020-11-26 2020-12-28 Quotations Envelope 25 storage tank and construction equivalent, of which IDA of communal water kiosk for US$150.0 million eq uivalent) Bunyala Sub-county Component 1: Upscaling KE-BUSIA COUNTY-211043- Climate-Smart Agricultural Under CW-RFQ / construction of Request for Single Stage - One 2021-04- IDA / 59450 Practices (US$163.8 million Post Limited 37,379.10 0.00 Implementat 2021-01-02 2021-01-14 2021-01-24 poultry park out grower unit Quotations Envelope 24 equivalent, of which IDA ion in Bunyala North Ward , Unit A US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-211052- Climate-Smart Agricultural CW-RFQ / construction of out Request for Single Stage - One 2021-04- IDA / 59450 Practices (US$163.8 million Post Limited 37,379.70 33,235.49 Signed 2021-01-02 2021-01-14 2021-01-24 2021-02-22 grower unit for the poultry Quotations Envelope 24 equivalent, of which IDA park for Bunyala North ward US$150.0 million eq uivalent) KE-BUSIA COUNTY-211057- Component 1: Upscaling CW-RFQ / Fencing of the Climate-Smart Agricultural Under Request for Single Stage - One 2021-03- poultry hatchery for the IDA / 59450 Practices (US$163.8 million Post Limited 10,000.00 0.00 Implementat 2021-01-02 2021-01-14 2021-01-24 Quotations Envelope 25 poultry park hatchery sub equivalent, of which IDA ion project US$150.0 million eq uivalent) KE-BUSIA COUNTY-211059- Component 1: Upscaling CW-RFQ / construction of out Climate-Smart Agricultural Under Request for Single Stage - One 2021-04- grower unit for the poultry IDA / 59450 Practices (US$163.8 million Post Limited 37,379.70 0.00 Implementat 2021-01-02 2021-01-14 2021-01-24 Quotations Envelope 24 park sub project Chakol south equivalent, of which IDA ion ward US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-211062- Climate-Smart Agricultural CW-RFQ / construction of out Request for Single Stage - One 2021-04- IDA / 59450 Practices (US$163.8 million Post Limited 37,379.70 0.00 Canceled 2021-01-02 2021-01-14 2021-01-24 grower for the poultry park in Quotations Envelope 24 equivalent, of which IDA chakol south ward US$150.0 million eq uivalent) KE-BUSIA COUNTY-211068- Component 1: Upscaling CW-RFQ / fencing of the Climate-Smart Agricultural Under Request for Single Stage - One 2021-03- hatchery for the poultry park IDA / 59450 Practices (US$163.8 million Post Limited 10,000.00 0.00 Implementat 2021-01-02 2021-01-14 2021-01-24 Quotations Envelope 25 in Teso South Sub county, equivalent, of which IDA ion Chakol South Ward US$150.0 million eq uivalent) KE-BUSIA COUNTY-211079- Component 1: Upscaling CW-RFQ / construction of Climate-Smart Agricultural Request for Single Stage - One 2021-03- gate, fencing and pond IDA / 59450 Practices (US$163.8 million Post Limited 22,100.00 20,622.67 Signed 2021-01-02 2021-01-14 2021-01-24 2021-02-22 Quotations Envelope 25 renovation for Okerebwa , equivalent, of which IDA Bukani Sub project satellite US$150.0 million eq uivalent) KE-BUSIA COUNTY-233230- CW-RFQ / CONSTRUCTION OF Component 1: Upscaling Request for PULTRY PARK OUT GROWER Climate-Smart Agricultural Quotations - Small Pending Request for Single Stage - One 2021-11- UNIT "A" AT ASIRIAM IDA / 59450 Practices (US$163.8 million Post Limited Works 37,379.70 0.00 Implementat 2021-05-13 2021-06-03 Quotations Envelope 30 VILLAGE, CHAKOL SOUTH equivalent, of which IDA (Emergency) SPD - ion WARD, TESO SOUTH SUB- US$150.0 million eq uivalent) Competitive COUNTY KE-BUSIA COUNTY-233256- Component 1: Upscaling National CW-RFQ / construction of Climate-Smart Agricultural Procurement Pending Request for Single Stage - One 2021-12- post harvest fish handling and IDA / 59450 Practices (US$163.8 million Post Limited Document - 1 140,000.00 0.00 Implementat 2021-05-22 2021-06-19 Quotations Envelope 16 storage cold room and fish equivalent, of which IDA Envelope process ion eatery US$150.0 million eq uivalent) (Non Bank-SPD) Component 1: Upscaling National KE-BUSIA COUNTY-233476- Climate-Smart Agricultural Procurement Pending CW-RFQ / Renovation of Request for Single Stage - One 2021-12- IDA / 59450 Practices (US$163.8 million Post Limited Document - 1 63,000.00 0.00 Implementat 2021-05-24 2021-06-17 cattle dips and construction of Quotations Envelope 14 equivalent, of which IDA Envelope process ion crush pens US$150.0 million eq uivalent) (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-BUSIA COUNTY-139874- Component 4: Project GO-RFQ / Procurement of Coordination and Request for Single Stage - One office furniture and IDA / 59450 Management (US$29.3 Post Limited 22,222.29 20,989.43 Completed 2019-06-01 2019-05-28 2019-07-27 2019-06-21 2020-01-23 2019-08-28 Quotations Envelope equipment for the County million equivalent, of which Project Coordination Unit. IDA US$20.0 million equivalent) KE-BUSIA COUNTY-139847- Component 1: Upscaling GO-RFQ / Procurement of Climate-Smart Agricultural Request for Single Stage - One inlet and outlet pond IDA / 59450 Practices (US$163.8 million Post Limited 32,875.53 31,051.64 Completed 2019-06-25 2019-06-17 2019-08-20 2019-06-21 2020-02-16 2019-07-22 Quotations Envelope equipment for the Bukani equivalent, of which IDA Aquaculture park US$150.0 million eq uivalent) development KE-BUSIA COUNTY-139896- GO-RFQ / PROCUREMENT OF Component 1: Upscaling TILAPIA AND CATFISH Climate-Smart Agricultural Request for Single Stage - One HATCHERY SYSTEM AT THE IDA / 59450 Practices (US$163.8 million Post Limited 59,807.77 56,489.71 Completed 2019-06-23 2019-06-17 2019-08-18 2019-06-27 2020-02-14 2019-06-27 Quotations Envelope CENTRE FOR AQUACULTURE equivalent, of which IDA TRAINING AND SEED US$150.0 million eq uivalent) PRODUCTION AT WAKHUNGU KE-BUSIA COUNTY-139893- Component 1: Upscaling GO-RFQ / Procurment of Climate-Smart Agricultural Request for Single Stage - One Hatchery equipments for IDA / 59450 Practices (US$163.8 million Post Limited 21,262.14 20,082.54 Completed 2019-06-23 2019-06-17 2019-08-18 2019-06-24 2020-02-14 2019-07-27 Quotations Envelope Centre of seed production and equivalent, of which IDA training Wakhungu US$150.0 million eq uivalent) Page 2 Component 4: Project KE-BUSIA COUNTY-139897- Coordination and Pending GO-RFQ / Extension and Request for Single Stage - One IDA / 59450 Management (US$29.3 Post Limited 22,731.36 0.00 Implementati 2019-05-10 2019-07-05 2020-01-01 renovation of County Project Quotations Envelope million equivalent, of which on Coordination Unit office IDA US$20.0 million equivalent) Component 4: Project KE-BUSIA COUNTY-136484- Coordination and Single Stage - One GO-RFB / Procurement of IDA / 59450 Management (US$29.3 Prior Request for Bids Open - National 1,000,000.00 0.00 Canceled 2019-10-21 2019-10-26 2019-11-25 2019-12-09 2020-01-06 2020-04-05 Envelope computers million equivalent, of which IDA US$20.0 million equivalent) Component 4: Project KE-BUSIA COUNTY-150312- Coordination and Request for Single Stage - One GO-RFQ / sign posts for the IDA / 59450 Management (US$29.3 Post Limited 4,000.00 0.00 Canceled 2019-12-23 2020-02-17 2020-08-15 Quotations Envelope project publicity and visibility million equivalent, of which IDA US$20.0 million equivalent) Component 4: Project Coordination and KE-BUSIA COUNTY-150871- Request for Single Stage - One IDA / 59450 Management (US$29.3 Post Limited 700.00 0.00 Canceled 2019-12-23 2020-02-17 2020-08-15 GO-RFQ / Laser Projector Quotations Envelope million equivalent, of which IDA US$20.0 million equivalent) Component 4: Project Coordination and KE-BUSIA COUNTY-150976- Request for Single Stage - One IDA / 59450 Management (US$29.3 Post Limited 500.00 0.00 Canceled 2019-12-23 2020-02-17 2020-08-15 GO-RFQ / Digital Camera Quotations Envelope million equivalent, of which IDA US$20.0 million equivalent) KE-BUSIA COUNTY-150986- GO-RFQ / supply , installation and commissioning of power Component 1: Upscaling generator enclosed set. Climate-Smart Agricultural Under 55KVA with Canopy, Battery Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 17,000.00 0.00 Implementati 2019-12-23 2020-01-23 2020-02-17 2020-08-15 Charger, Newage stampford Quotations Envelope equivalent, of which IDA on alternator, automatic change US$150.0 million eq uivalent) over switch, amoured cable 4 core 100MM SQ, Earthing/ Exhaust Fabrication KE-BUSIA COUNTY-150998- GO-RFQ / Procurement of all Component 1: Upscaling Male Tilapia( 50,000) Climate-Smart Agricultural Pending Request for Single Stage - One 10Grams Fingerlings from IDA / 59450 Practices (US$163.8 million Post Limited 15,000.00 0.00 Implementati 2019-12-23 2020-02-17 2020-08-15 Quotations Envelope certified hatchery for first half equivalent, of which IDA on of the 100 ponds at Bukani US$150.0 million eq uivalent) Aquapark KE-BUSIA COUNTY-151003- Component 1: Upscaling GO-RFQ / Tilapia Grower Climate-Smart Agricultural 3mm pellets fish feed 30% CP Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 36,000.00 33,912.63 Completed 2019-12-23 2020-01-28 2020-02-17 2020-01-28 2020-08-15 2020-02-11 < 1.8 FCR which is a start up Quotations Envelope equivalent, of which IDA support with 1 production US$150.0 million eq uivalent) cycle for the Bukani Aquapark Component 1: Upscaling KE-BUSIA COUNTY-151022- Climate-Smart Agricultural GO-RFQ / Tilapia fingerlings Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 11,400.00 10,709.25 Completed 2019-12-23 2020-01-21 2020-02-17 2020-01-28 2020-08-15 2020-02-11 starter fish feed mash 35% CP Quotations Envelope equivalent, of which IDA < 1.8 FCR US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-151027- Climate-Smart Agricultural GO-RFQ / Tilapia Brooder Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 12,580.00 11,817.75 Completed 2019-12-23 2020-01-22 2020-02-17 2020-01-28 2020-08-15 2020-02-11 4mm feed pellets 32% CP < Quotations Envelope equivalent, of which IDA 1.8 FCR US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-151028- Climate-Smart Agricultural Request for Single Stage - One GO-RFQ / Tilapia Brooders IDA / 59450 Practices (US$163.8 million Post Limited 5,000.00 4,790.98 Completed 2019-12-23 2020-01-28 2020-02-17 2020-01-28 2020-08-15 2020-02-11 Quotations Envelope male one thousand pieces equivalent, of which IDA US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-151031- Climate-Smart Agricultural GO-RFQ / Tilapia Brooders Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 9,900.00 9,198.68 Completed 2019-12-23 2020-01-22 2020-02-17 2020-01-28 2020-08-15 2020-02-11 female one thousand eight Quotations Envelope equivalent, of which IDA hundred pieces US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-151057- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFB / Catfish Brooders IDA / 59450 Practices (US$163.8 million Post Limited 3,250.00 0.00 Implementati 2019-12-23 2020-02-17 2020-08-15 Quotations Envelope 1:3 Male : Female equivalent, of which IDA on US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-169548- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFQ / procurement of IDA / 59450 Practices (US$163.8 million Post Limited 67,041.19 0.00 Implementati 2020-05-05 2020-06-09 2020-07-09 Quotations Envelope poultry equipment equivalent, of which IDA on US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-169550- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFQ / procurement of IDA / 59450 Practices (US$163.8 million Post Limited 12,734.08 0.00 Implementati 2020-05-05 2020-06-09 2020-07-09 Quotations Envelope poultry drugs and vaccines equivalent, of which IDA on US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-169552- Climate-Smart Agricultural Pending GO-RFQ / procurement of Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 23,595.50 0.00 Implementati 2020-05-05 2020-06-09 2020-07-09 brooding stock both cockerels Quotations Envelope equivalent, of which IDA on and hens US$150.0 million eq uivalent) KE-BUSIA COUNTY-174117- Component 1: Upscaling GO-RFQ / procurement of Climate-Smart Agricultural Request for Single Stage - One pelletizer machine for bukani IDA / 59450 Practices (US$163.8 million Post Limited 32,685.84 32,152.71 Signed 2020-06-05 2020-09-16 2020-07-10 2020-10-08 2020-08-09 Quotations Envelope sub project at Nasewa satellite equivalent, of which IDA station US$150.0 million eq uivalent) Component 1: Upscaling Climate-Smart Agricultural KE-BUSIA COUNTY-179923- Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 56,364.49 52,702.38 Signed 2020-06-23 2020-09-16 2020-07-12 2020-10-08 2020-08-11 GO-RFQ / fish feed Quotations Envelope equivalent, of which IDA US$150.0 million eq uivalent) Page 3 KE-BUSIA COUNTY-182330- GO-RFQ / procurement of Component 1: Upscaling fabrication and installation of Climate-Smart Agricultural Request for Single Stage - One 40ft length by 8ft width by IDA / 59450 Practices (US$163.8 million Post Limited 18,779.34 36,798.52 Signed 2020-07-15 2020-09-16 2020-08-08 2020-10-08 2020-10-07 Quotations Envelope 8.6 height office and store equivalent, of which IDA container at Bukani US$150.0 million eq uivalent) Aquaculture park Component 1: Upscaling KE-BUSIA COUNTY-182331- Climate-Smart Agricultural Request for Single Stage - One GO-RFQ / Pond management IDA / 59450 Practices (US$163.8 million Post Limited 15,023.47 13,945.90 Signed 2020-07-22 2021-01-22 2020-08-10 2021-02-22 2020-09-09 Quotations Envelope equipment equivalent, of which IDA US$150.0 million eq uivalent) KE-BUSIA COUNTY-182332- Component 1: Upscaling GO-RFQ / All male tilapia Climate-Smart Agricultural hybrid fingerlings for 100 Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 14,084.50 13,059.70 Signed 2020-07-18 2021-01-22 2020-08-11 2021-02-22 2020-09-10 ponds with 1000 capacity Quotations Envelope equivalent, of which IDA fingerlings for Bukani US$150.0 million eq uivalent) Aquaculture park KE-BUSIA COUNTY-169508- Component 1: Upscaling GO-RFQ / Fencing materials Climate-Smart Agricultural for the poultry park both for Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 5,617.98 0.00 Canceled 2020-05-23 2020-06-27 2020-07-27 production unit and out- Quotations Envelope equivalent, of which IDA growers units for Bunyala and US$150.0 million eq uivalent) Teso South Sub-counties KE-BUSIA COUNTY-182329- GO-RFQ / Procurement of Component 1: Upscaling Information Communication Climate-Smart Agricultural Request for Single Stage - One and Technology equipment IDA / 59450 Practices (US$163.8 million Post Limited 15,962.44 11,746.08 Signed 2020-07-20 2021-01-22 2020-08-17 2021-02-22 2020-09-16 Quotations Envelope and software for managing equivalent, of which IDA the satellite sites for Bukani US$150.0 million eq uivalent) Sub-project Component 1: Upscaling KE-BUSIA COUNTY-227590- Climate-Smart Agricultural GO-RFQ / procurement of Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 40,500.00 0.00 Canceled 2021-04-15 2021-04-28 2021-05-02 2021-07-01 Nine (9No.) motorcycles of Quotations Envelope equivalent, of which IDA 151 - 185cc capacity US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-228272- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFQ / Livestock vaccines IDA / 59450 Practices (US$163.8 million Post Limited 72,400.00 0.00 Implementati 2021-04-19 2021-05-06 2021-08-04 Quotations Envelope for Vector control vaccination equivalent, of which IDA on US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-228294- Climate-Smart Agricultural Pending GO-RFQ / Vector control and Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 46,800.00 0.00 Implementati 2021-04-19 2021-05-06 2021-08-04 Tsetse diagnostic laboratory Quotations Envelope equivalent, of which IDA on equipment US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-228302- Climate-Smart Agricultural GO-RFQ / Renovation of cattle Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 63,000.00 0.00 Canceled 2021-04-28 2021-05-22 2021-11-18 dips (2No.) and construction Quotations Envelope equivalent, of which IDA of crush pens (14No.) US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-233245- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFQ / pond construction IDA / 59450 Practices (US$163.8 million Post Limited 20,000.00 0.00 Implementati 2021-05-22 2021-06-19 2021-09-17 Quotations Envelope and maintenance equipment equivalent, of which IDA on US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-233250- Climate-Smart Agricultural Pending GO-RFQ / machines and farm Request for IDA / 59450 Practices (US$163.8 million Post 40,000.00 0.00 Implementati 2021-05-22 2021-06-19 2021-09-17 equipment for managing the Quotations equivalent, of which IDA on aquaculture parks US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-233489- Climate-Smart Agricultural Pending GO-RFQ / breed improvement Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 37,300.00 0.00 Implementati 2021-05-24 2021-06-17 2021-09-15 for improved agricultural Quotations Envelope equivalent, of which IDA on productivity US$150.0 million eq uivalent) KE-BUSIA COUNTY-234081- Component 1: Upscaling GO-RFQ / Procurement for Climate-Smart Agricultural Under nine (9No.) motorcycles with Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 45,000.00 37,483.34 Implementati 2021-05-12 2021-05-13 2021-06-02 2021-08-01 trail of 151 - 185CC for the 6 Quotations Envelope equivalent, of which IDA on wards where KCSAP is being US$150.0 million eq uivalent) implemented. Component 1: Upscaling KE-BUSIA COUNTY-236218- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFQ / Incubators for IDA / 59450 Practices (US$163.8 million Post Limited 55,000.00 0.00 Implementati 2021-06-10 2021-07-11 2021-10-09 Quotations Envelope 1,056 eggs capacity equivalent, of which IDA on US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-236219- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFQ / 40 Litre capacity IDA / 59450 Practices (US$163.8 million Post Limited 1,210.40 0.00 Implementati 2021-06-10 2021-07-11 2021-10-09 Quotations Envelope freezers equivalent, of which IDA on US$150.0 million eq uivalent) KE-BUSIA COUNTY-236220- Component 1: Upscaling GO-RFQ / Brooders , 500 Climate-Smart Agricultural Pending Request for Single Stage - One chick capacity, 1m high, 4M IDA / 59450 Practices (US$163.8 million Post Limited 3,000.00 0.00 Implementati 2021-06-10 2021-07-18 2021-10-16 Quotations Envelope diameter each equipped with equivalent, of which IDA on 2 infra- red bulbs of 250 US$150.0 million eq uivalent) Watts Component 1: Upscaling KE-BUSIA COUNTY-236221- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFQ / Big plastic feeders IDA / 59450 Practices (US$163.8 million Post Limited 30,895.93 0.00 Implementati 2021-06-10 2021-07-18 2021-10-16 Quotations Envelope and big plastic drinkers equivalent, of which IDA on US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-236222- Climate-Smart Agricultural Pending Request for Single Stage - One GO-RFQ / Generator , 5.5 KVA IDA / 59450 Practices (US$163.8 million Post Limited 24,341.00 0.00 Implementati 2021-06-10 2021-07-18 2021-10-16 Quotations Envelope Diesel equivalent, of which IDA on US$150.0 million eq uivalent) Page 4 Component 1: Upscaling KE-BUSIA COUNTY-237862- Climate-Smart Agricultural Pending GO-RFQ / poultry drugs and Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 17,038.00 0.00 Implementati 2021-06-12 2021-06-29 2021-09-27 vaccines for both Bunyala and Quotations Envelope equivalent, of which IDA on Teso South poultry parks US$150.0 million eq uivalent) Component 1: Upscaling KE-BUSIA COUNTY-239080- Climate-Smart Agricultural Pending GO-RFQ / Breeder hens and Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 24,000.00 0.00 Implementati 2021-06-18 2021-07-09 2021-10-07 cocks for both Bunyala and Quotations Envelope equivalent, of which IDA on Teso South Poultry parks US$150.0 million eq uivalent) KE-BUSIA COUNTY-239085- Component 1: Upscaling GO-RFQ / layers mash , Climate-Smart Agricultural Pending Request for Single Stage - One kienyeji mash, chick mash for IDA / 59450 Practices (US$163.8 million Post Limited 99,920.92 0.00 Implementati 2021-06-18 2021-07-09 2021-10-07 Quotations Envelope both Bunyala and teso South equivalent, of which IDA on poultry parks US$150.0 million eq uivalent) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-BUSIA COUNTY-233266- NC-DIR / Electricity supply which will include, excavation Component 1: Upscaling and reinstatement of the cable Climate-Smart Agricultural Pending trenches, electrical wiring IDA / 59450 Practices (US$163.8 million Post Direct Selection Direct 23,398.09 0.00 Implementati 2021-05-17 2021-05-22 2021-05-22 2021-08-20 installation, installation of equivalent, of which IDA on standard communication US$150.0 million eq uivalent) cables the KPLC supply termination point to Teso South Aquaculture park CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-BUSIA COUNTY-139892- Component 1: Upscaling CS-QCBS / Procurement of Climate-Smart Agricultural consultancy services to Quality And Cost- IDA / 59450 Practices (US$163.8 million Post Open - National 116,504.85 110,023.98 Signed 2019-03-26 2019-06-26 2019-04-16 2020-09-08 2019-05-30 2019-06-25 2019-06-27 2019-07-16 2019-07-27 2019-08-01 2019-08-31 2019-08-21 2019-10-05 2019-10-08 2020-10-04 provide technical advisory Based Selection equivalent, of which IDA services to Farmer/ Producer US$150.0 million eq uivalent) Groups in Busia County INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 Summarized Procurement Plan I. General 1. Project Name: Integrated Cities and Urban Development Project ( ICUD) 2. Period covered by this procurement plan: First 18 months II. Goods and Non-consulting Services 1. Procurement Methods and Prior Review Thresholds: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Category Method of Threshold (US$ Prior Review Threshold (US$ Procurement Equivalent) Equivalent) Goods ICB No threshold All contracts above $1,000,000 NCB <500,000 None Shopping <100,000 None Direct No threshold All contracts Contracting Non- ICB No threshold All contracts above $1,000,000 consulting services NCB <1,000,000 None Shopping <100,000 None Direct No threshold All contracts Contracting III. Selection of Consultants 1. Selection Methods and Prior Review Thresholds: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Category Selection Threshold Prior Review Threshold Method (US$ Equivalent) (US$ Equivalent) Consulting QCBS/QBS No threshold All contracts above $500,000 Services Firms FBS/CQS/LCS <200,000 None Sole Source No threshold All contracts Individuals IC No threshold All contracts above $200,000 Sole Source No threshold All contracts 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. All Terms of Reference shall be subject to the World Bank’s clearance. PROCUREMENT West Bank and Gaza : GZ-Integrated Cities and Urban Development Project PLAN General Information Country: West Bank and Gaza Bank’s Approval Date of the Original Procurement Plan: 2016-08-17 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150991 GPN Date: 2016-08-17 Project Name: GZ-Integrated Cities and Urban Development Project Loan / Credit No: / , TF / A2846 M Executing Agency(ies): unicipal Development and Lending Fund WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component No. 2: Project GZ-MDLF-841-GO-RFQ / Request for Single Stage - One / Implementation Support and Post Limited 3,109.96 Completed 2016-10-06 2017-03-16 2016-12-01 2017-03-30 2017-05-30 2017-04-12 Supply of Office Furniture. Quotations Envelope Management Cost Component No. 2: Project GZ-MDLF-840-GO-RFQ / Request for Single Stage - One / Implementation Support and Post Limited 20,518.00 Completed 2016-10-05 2017-03-01 2016-11-30 2017-03-20 2017-05-29 2017-05-03 Supply of Hardware Quotations Envelope Management Cost GZ-MDLF-2666-GO-RFQ / Component No. 1: Planning Request for Single Stage - One Supply of Hardware for the / Post Limited 1,767.00 Completed 2016-10-23 2016-10-25 2016-12-18 2016-11-03 2017-06-16 2016-11-08 for Sustainable Urban Growth Quotations Envelope Technical Supervisor. GZ-MDLF-5595-GO-RFQ / Component No. 2: Project Provision of Adobe Design Request for Single Stage - One TF / A2846 Implementation Support and Post Open - National 0.00 Canceled 2017-03-06 2017-05-01 2017-10-28 Package and GIS software for Quotations Envelope Management Cost the project. GZ-MDLF-33859-GO-RFQ / Component No. 1: Planning Request for Single Stage - One Supply of Total Station for TF / A2846 Post Limited 0.00 Terminated 2017-11-10 2017-12-03 2018-01-05 2017-12-26 2018-07-04 for Sustainable Urban Growth Quotations Envelope Gaza Municipality GZ-MDLF-41088-GO-RFQ / Supply of Hardware for the Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Limited 1,487.00 Completed 2018-01-01 2018-01-30 2018-02-19 2018-02-12 2018-03-21 2018-03-06 Technical Coordinator at for Sustainable Urban Growth Quotations Envelope MOLG GZ-MDLF-842-GO-RFQ / Component No. 1: Planning Request for Single Stage - One / Post Limited 0.00 Canceled 2016-10-05 2016-11-30 2017-05-29 Supply of Hardware for Gaza for Sustainable Urban Growth Quotations Envelope GZ-MDLF-57568-GO-RFQ / Supply of hardware to support Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Limited 29,991.00 Completed 2018-06-06 2018-06-24 2018-08-01 2018-08-08 2018-09-30 2018-10-31 development of Integrated GIS for Sustainable Urban Growth Quotations Envelope database/Hebron Urban Area GZ-MDLF-57569-GO-RFQ / Supply of Hardware to support Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Limited 13,990.00 Completed 2018-04-25 2018-07-23 2018-06-20 2018-08-28 2018-08-19 2019-01-13 Integrated Planning in Gaza for Sustainable Urban Growth Quotations Envelope Municipality GZ-MDLF-67743-GO-RFQ / Component No. 1: Planning Supply of Tow Total Stations TF / A2846 Post Direct Selection Direct 37,324.00 Completed 2018-06-25 2018-07-15 2018-06-30 2018-07-17 2018-08-04 2018-07-24 2019-01-31 2018-08-02 for Sustainable Urban Growth for Gaza Municipality GZ-MDLF-185208-GO-RFQ / Pending Supply of a Central Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Open - National 0.00 Implementati 2021-02-20 2021-04-17 2021-08-15 Cardboard Baler Machine for for Sustainable Urban Growth Quotations Envelope on Bethlehem Urban Area GZ-MDLF-185237-GO-DIR / Pending Component No. 1: Planning Supply of Software for Traffic TF / A2846 Post Direct Selection Direct 0.00 Implementati 2020-08-01 2020-08-06 2020-09-10 2021-03-09 for Sustainable Urban Growth Modelling-Ramallah & Al Bireh on GZ-MDLF-164011-GO-DIR / Component No. 1: Planning Supply of Software for Traffic TF / A2846 Post Direct Selection Direct 87,472.10 Completed 2020-09-01 2020-04-19 2020-09-06 2020-11-23 2020-10-11 2020-12-20 2021-04-09 2021-04-29 for Sustainable Urban Growth Modelling GZ-MDLF-201708-GO-RFQ / Component No. 2: Project Request for Single Stage - One Supply of hardware for the TF / A2846 Implementation Support and Post Limited 10,575.00 Completed 2020-11-09 2020-11-30 2021-01-04 2021-02-02 2021-02-03 2021-03-30 Quotations Envelope ICUD team Management Cost GZ-MDLF-222287-GO-RFQ / Pending Component No. 1: Planning Request for Single Stage - One Acquisition of an aerial photo TF / A2846 Post Limited 0.00 Implementati 2021-03-15 2021-05-10 2021-09-07 for Sustainable Urban Growth Quotations Envelope for Gaza city on GZ-MDLF-222290-GO-RFQ / Supply of IT hardware for Component No. 1: Planning Request for Single Stage - One Gaza city Infrastructure TF / A2846 Post Limited 44,085.00 Signed 2021-03-15 2021-03-15 2021-05-10 2021-04-15 2021-08-08 for Sustainable Urban Growth Quotations Envelope management and planning optimization GZ-MDLF-222293-GO-RFQ / Pending SCADA system software for Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Limited 0.00 Implementati 2021-03-15 2021-05-10 2021-08-08 water maintenance and for Sustainable Urban Growth Quotations Envelope on monitoring GZ-MDLF-233807-GO-RFQ / Pending Supply and Install of Solar Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Limited 0.00 Implementati 2021-08-21 2021-10-16 2022-01-14 Photovoltaic Systems for Gaza for Sustainable Urban Growth Quotations Envelope on Urban Area Page 1 GZ-MDLF-233805-GO-RFB / Supply and Install of Solar Pending Component No. 1: Planning Single Stage - One Photovoltaic Systems for TF / A2846 Post Request for Bids Open - National 0.00 Implementati 2021-09-15 2021-09-20 2021-11-01 2021-12-01 2022-01-05 2022-05-05 for Sustainable Urban Growth Envelope Targeted Urban Areas in West on Bank" NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-MDLF-79395-NC-RFQ / Component No. 1: Planning Request for Single Stage - One Geographic Information TF / A2846 Post Limited 15,070.70 Completed 2018-10-25 2018-10-07 2018-12-20 2018-10-31 2019-02-03 2019-01-31 for Sustainable Urban Growth Quotations Envelope System (GIS) Training GZ-MDLF-78354-NC-RFQ / Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Open - National 18,453.00 Completed 2018-10-20 2018-12-15 2019-01-17 2019-04-14 2019-05-12 Beit Sahour Photogrammetry for Sustainable Urban Growth Quotations Envelope GZ-MDLF-112708-NC-RFQ / Training Courses for IT officers (Administrator & Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Limited 10,892.60 Completed 2019-05-14 2019-05-21 2019-07-09 2019-06-17 2019-10-07 2019-09-12 Developers ): To Manage and for Sustainable Urban Growth Quotations Envelope Develop the Urban Performance Tool GZ-MDLF-843-NC-RFQ / Supply of Updated Areal Component No. 1: Planning Request for Single Stage - One / Post Limited 0.00 Canceled 2017-04-06 2017-06-01 2017-11-28 Photogrammetric or Satellite for Sustainable Urban Growth Quotations Envelope Images for Gaza City GZ-MDLF-185216-NC-RFQ / Public Awareness Campaign Component No. 1: Planning Request for Single Stage - One TF / A2846 Post Limited 0.00 Canceled 2020-08-15 2021-03-18 2021-09-14 Cardboard and paper sorting- for Sustainable Urban Growth Quotations Envelope Bethlehem Urban Area CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-MDLF-850-CS-QCBS / Assessment and Collection of Component No. 1: Planning Quality And Cost- Missing Data and Analysis to / Post Open - National 0.00 Canceled 2017-03-01 2017-03-22 2017-05-05 2017-06-02 2017-07-02 2017-08-06 2017-09-10 2018-09-10 for Sustainable Urban Growth Based Selection Develop Urban Growth Footprint in Gaza City GZ-MDLF-7705-CS-QCBS / Component No. 1: Planning Quality And Cost- Urban Growth Scenario TF / A2846 Prior Open - International 486,956.17 Signed 2017-03-19 2017-08-14 2017-04-09 2017-08-16 2017-05-23 2017-11-22 2017-06-20 2017-12-31 2017-07-20 2018-02-05 2017-08-24 2018-02-26 2017-09-28 2018-02-22 2018-09-28 for Sustainable Urban Growth Based Selection Exercise GZ-MDLF-57571-CS-CQS / Prepare a Comprehensive Public Transportation Plan for Component No. 1: Planning Quality And Cost- Ramallah and Al Bireh Urban TF / A2846 Post Open - National 0.00 Canceled 2018-07-20 2018-08-06 2018-08-03 2018-08-24 2018-09-23 2018-10-07 2018-10-21 2018-11-25 2019-05-24 for Sustainable Urban Growth Based Selection Area and Expand the RAB Mobility Plan to include Surda Abu Qush Town GZ-MDLF-57572-CS-QCBS / Prepare the Environmental Component No. 1: Planning Quality And Cost- TF / A2846 Post Open - National 0.00 Canceled 2018-06-01 2018-06-15 2018-07-06 2018-08-03 2018-08-17 2018-08-31 2018-10-05 2019-04-03 Impact Assessment study for Sustainable Urban Growth Based Selection /Nablus and Bethlehem Area GZ-MDLF-57573-CS-QCBS / Prepare a Mobility Component No. 1: Planning Quality And Cost- Study/Traffic study for TF / A2846 Post Open - National 81,174.00 Signed 2018-06-01 2018-11-22 2018-06-22 2018-07-13 2019-01-03 2018-08-10 2019-02-10 2018-08-24 2019-02-17 2018-09-28 2019-02-20 2018-11-02 2019-03-10 2019-05-01 for Sustainable Urban Growth Based Selection Hebron and Nablus Urban Areas GZ-MDLF-849-CS-CQS / Consultant Component No. 1: Planning Capacity Development for / Post Qualification Open - National 0.00 Canceled 2016-12-01 2016-12-22 2017-02-04 2017-03-06 2017-04-10 2017-10-07 for Sustainable Urban Growth LGUs, MDLF and MoLG Selection GZ-MDLF-226-CS-QCBS / Assessment and Collection of Existing Urban Growth Data Component No. 1: Planning Quality And Cost- / Post Open - International 0.00 Canceled 2016-10-01 2016-10-22 2016-12-05 2017-01-02 2017-02-01 2017-03-08 2017-04-12 2017-08-13 and Development of Urban for Sustainable Urban Growth Based Selection Growth Planning Roadmaps in West Bank and Gaza GZ-MDLF-78337-CS-QCBS / Demographic Change and Component No. 1: Planning Quality And Cost- TF / A2846 Post Open - National 0.00 Canceled 2018-11-15 2018-12-06 2019-01-19 2019-02-16 2019-03-18 2019-04-22 2019-05-27 2019-11-23 service demand Study for for Sustainable Urban Growth Based Selection Bethlehem Urban Area GZ-MDLF-105921-CS-QCBS / Prepare a Comprehensive Component No. 1: Planning Quality And Cost- Under Public Transportation Plan for TF / A2846 Post Open - International 238,480.00 2019-03-31 2019-06-10 2019-04-21 2019-06-16 2019-06-04 2019-07-15 2019-07-02 2019-09-09 2019-08-01 2019-09-19 2019-09-05 2019-09-25 2019-10-10 2019-11-05 2020-10-09 for Sustainable Urban Growth Based Selection Implementation Ramallah and Al Bireh Urban Area GZ-MDLF-105935-CS-CQS / Extension of the Traffic and Consultant Transportation Plan for Component No. 1: Planning TF / A2846 Post Qualification Open - National 29,998.00 Completed 2019-03-31 2019-04-30 2019-04-21 2019-06-04 2019-06-10 2019-07-04 2019-07-01 2019-08-08 2019-07-10 2019-12-06 2019-11-10 Ramallah, Al-Bireh, and for Sustainable Urban Growth Selection Betunia to include Surda-Abu Qush. GZ-MDLF-105937-CS-QCBS / Strategic Environmental and Component No. 1: Planning Quality And Cost- Social Assessment for the five TF / A2846 Post Open - International 214,704.00 Signed 2019-03-31 2019-06-26 2019-04-21 2019-07-08 2019-06-04 2019-08-26 2019-07-02 2019-10-21 2019-08-01 2019-11-19 2019-09-05 2019-11-14 2019-10-10 2019-12-15 2020-06-06 for Sustainable Urban Growth Based Selection targeted urban areas in West Bank & Gaza GZ-MDLF-106015-CS-CQS / Consultant Component No. 1: Planning Pending Development Plan for the TF / A2846 Post Qualification Open - National 0.00 2020-09-01 2020-09-22 2020-11-05 2020-12-05 2021-01-26 2021-05-26 for Sustainable Urban Growth Implementation Water Front for Gaza City Selection Page 2 GZ-MDLF-153610-CS-QCBS / Developing a Sustainable Component No. 1: Planning Quality And Cost- TF / A2846 Post Open - International 382,730.44 Signed 2020-06-01 2020-07-29 2020-06-22 2020-08-05 2020-09-09 2020-09-02 2020-11-01 2020-10-02 2020-11-24 2020-11-06 2020-12-24 2020-12-11 2021-02-09 2021-08-08 Tourism Development Plan for for Sustainable Urban Growth Based Selection Bethlehem Urban area GZ-MDLF-164003-CS-CQS / Local Technical consultant for Consultant Component No. 1: Planning Pilot Project for Cardboard TF / A2846 Post Qualification Open - National 19,923.00 Signed 2020-10-01 2020-12-17 2020-10-22 2020-12-05 2021-02-03 2021-01-04 2021-03-23 2021-02-08 2021-03-29 2022-02-07 for Sustainable Urban Growth and Paper Sorting- Bethlehem Selection Urban Area GZ-MDLF-201725-CS-CQS / Consultant Assessment of IT-GIS Component No. 1: Planning TF / A2846 Post Qualification Open - National 17,400.00 Signed 2020-11-04 2020-11-12 2020-11-25 2021-01-08 2020-12-07 2021-02-07 2021-01-10 2021-03-14 2021-01-10 2021-09-10 Environment for the ICUD for Sustainable Urban Growth Selection Targeted Urban Areas GZ-MDLF-210299-CS-CQS / Consultant Public Awareness Campaign Component No. 1: Planning TF / A2846 Post Qualification Open - National 21,450.00 Signed 2020-12-20 2020-12-27 2021-01-10 2021-02-23 2021-02-02 2021-03-25 2021-05-12 2021-04-29 2021-05-24 2021-07-28 Cardboard and paper sorting- for Sustainable Urban Growth Selection Bethlehem Urban Area GZ-MDLF-164006-CS-QCBS / LTC for Sustainable Urban Component No. 1: Planning Quality And Cost- Growth Pilot Projects: Gaza, TF / A2846 Post Open - International 68,998.59 Signed 2020-05-01 2021-01-21 2020-05-22 2020-07-05 2021-03-04 2020-08-02 2021-04-11 2020-09-01 2021-04-26 2020-10-06 2021-04-28 2020-11-10 2021-05-20 2021-07-08 for Sustainable Urban Growth Based Selection Hebron, Ramallah-Al-Bireh, and Nablus Urban Areas GZ-MDLF-222297-CS-CQS / Consultant Providing Capacity Building Component No. 1: Planning Pending TF / A2846 Post Qualification Open - National 0.00 2021-03-10 2021-03-31 2021-05-14 2021-06-13 2021-07-18 2022-01-14 Training for ICUD Targeted for Sustainable Urban Growth Implementation Selection Urban Areas GZ-MDLF-222299-CS-QCBS Component No. 1: Planning Quality And Cost- Pending / City center development TF / A2846 Post Open - National 0.00 2021-03-25 2021-04-15 2021-05-29 2021-06-26 2021-07-26 2021-08-30 2021-10-04 2022-10-04 for Sustainable Urban Growth Based Selection Implementation plan for Gaza GZ-MDLF-222301-CS-QCBS / Joint strategic spatial & Component No. 1: Planning Quality And Cost- Pending TF / A2846 Post Open - International 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-02 2021-08-01 2021-09-05 2021-10-10 2022-10-10 investment plan for the for Sustainable Urban Growth Based Selection Implementation targeted urban areas GZ-MDLF-163991-CS-QCBS / Joint Spatial Framework with Component No. 1: Planning Quality And Cost- TF / A2846 Post Open - International 0.00 Canceled 2020-10-01 2020-10-22 2020-12-05 2021-01-02 2021-02-01 2021-03-08 2021-04-12 2022-01-07 Capital investment Plans for for Sustainable Urban Growth Based Selection the targeted Urban areas INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-MDLF-851-CS-INDV / Individual Component No. 1: Planning Hiring of Technical GIS Data / Post Consultant Open - National 145,848.00 Signed 2017-01-01 2017-01-01 2017-02-19 2017-01-26 2017-03-12 2017-01-31 2017-04-16 2017-03-01 2017-10-13 for Sustainable Urban Growth Storage Specialist Selection GZ-MDLF-225-CS-INDV / Individual Component No. 1: Planning Technical Supervisor within / Post Consultant Open - National 32,000.00 Terminated 2016-06-29 2016-06-22 2016-08-16 2016-10-09 2016-09-06 2016-10-10 2016-10-11 2016-10-15 2017-04-09 for Sustainable Urban Growth MOLG. Selection GZ-MDLF-844-CS-INDV / Individual Component No. 1: Planning Hiring of Local Coordinator- / Post Consultant Open - National 32,775.00 Terminated 2016-11-29 2016-11-17 2017-01-17 2017-02-20 2017-02-07 2017-02-22 2017-03-14 2017-03-01 2017-09-10 for Sustainable Urban Growth Bethlehem Urban Area Selection GZ-MDLF-845-CS-INDV / Individual Component No. 1: Planning Hiring of Local Coordinator - / Post Consultant Open - National 139,245.00 Signed 2016-11-29 2016-11-17 2017-01-17 2017-01-30 2017-02-07 2017-01-30 2017-03-14 2017-03-01 2017-09-10 for Sustainable Urban Growth Hebron Urban Area Selection GZ-MDLF-848-CS-INDV / Individual Component No. 1: Planning Hiring of Local Coordinator - / Post Consultant Open - National 126,000.00 Signed 2016-11-29 2016-11-17 2017-01-17 2017-01-19 2017-02-07 2017-01-26 2017-03-14 2017-02-01 2017-09-10 for Sustainable Urban Growth Nablus Urban Area Selection GZ-MDLF-15955-CS-INDV / Individual Component No. 1: Planning Institutional Assesment of TF / A2846 Post Consultant Open 3,782.00 Terminated 2017-05-25 2017-07-12 2017-07-13 2017-09-14 2017-08-03 2017-09-14 2017-09-07 2017-09-20 2018-03-06 for Sustainable Urban Growth RAB Joint Cooperation Unit Selection GZ-MDLF-33862-CS-INDV / Individual Component No. 1: Planning Hiring of Local Coordinator at TF / A2846 Post Consultant Open 51,527.00 Terminated 2017-11-05 2017-12-03 2017-12-24 2017-12-03 2018-01-14 2017-12-04 2018-02-18 2017-12-14 2019-02-18 for Sustainable Urban Growth MOLG Selection Individual GZ-MDLF-24713-CS-INDV / Component No. 1: Planning TF / A2846 Post Consultant Open 0.00 Canceled 2017-08-13 2017-09-17 2017-09-22 2017-10-01 2018-10-01 ICUD Technical Supervisor for Sustainable Urban Growth Selection GZ-MDLF-57570-CS-INDV / Prepare the TOR for a Comprehensive Public Individual Transportation Plan for Component No. 1: Planning TF / A2846 Post Consultant Limited 4,200.00 Completed 2018-05-15 2018-05-28 2018-05-20 2018-05-19 2018-05-27 2018-06-11 2018-06-17 2018-07-11 2018-07-17 2018-08-10 Ramallah and Al Bireh Urban for Sustainable Urban Growth Selection Area and Expand the RAB Mobility Plan to include Surda Abu Qush Town GZ-MDLF-63644-CS-INDV / Individual Component No. 1: Planning Hiring of Local Coordinator - TF / A2846 Post Consultant Open 19,200.00 Signed 2018-05-25 2018-05-29 2018-06-23 2018-06-28 2018-07-14 2018-08-01 2018-08-18 2018-08-01 2019-03-16 for Sustainable Urban Growth Bethlehem Urban Area Selection GZ-MDLF-69297-CS-INDV / Individual Prepare a conceptual Spatial Component No. 1: Planning TF / A2846 Post Consultant Limited 7,680.00 Completed 2018-07-19 2018-07-15 2018-07-24 2018-07-18 2018-08-14 2018-07-22 2018-09-18 2018-07-22 2018-10-18 2018-10-07 Framework for the urban for Sustainable Urban Growth Selection areas targeted with ICUD project GZ-MDLF-78343-CS-INDV / Individual Component No. 1: Planning Personnel Skills & Team TF / A2846 Post Consultant Limited 1,600.00 Completed 2018-12-01 2019-05-22 2018-12-06 2019-05-29 2018-12-27 2019-07-10 2019-01-31 2019-07-25 2019-03-02 2019-09-24 for Sustainable Urban Growth Building Training Selection Page 3 GZ-MDLF-82654-CS-CDS / Component No. 1: Planning Introductory Training Course TF / A2846 Post Direct Selection Direct 11,645.00 Completed 2018-11-01 2018-10-16 2018-11-11 2019-01-15 2018-11-01 2019-03-12 2018-12-20 for Sustainable Urban Growth in Transportation Planning GZ-MDLF-82673-CS-CDS / Component No. 1: Planning Introductory Training Course TF / A2846 Post Direct Selection Direct 16,440.00 Completed 2018-11-01 2018-10-16 2018-11-11 2019-01-15 2018-11-01 2019-03-12 2018-12-20 for Sustainable Urban Growth in Urban Planning GZ-MDLF-153582-CS-CDS / Individual Component No. 1: Planning Institutional Development TF / A2846 Post Consultant Direct 40,800.00 Completed 2020-02-02 2020-01-22 2020-02-12 2020-01-27 2020-03-04 2020-02-11 2020-04-08 2020-02-15 2020-10-05 2020-12-15 for Sustainable Urban Growth Adviser Selection Individual GZ-MDLF-163998-CS-CDS / Component No. 1: Planning TF / A2846 Post Consultant Direct 30,120.00 Signed 2020-05-01 2020-05-27 2020-05-11 2020-06-02 2020-06-01 2020-06-02 2020-07-06 2020-06-15 2021-01-02 Senior Urban Adviser for Sustainable Urban Growth Selection GZ-MDLF-185235-CS-INDV Individual Component No. 1: Planning / Hiring of Local Coordinator TF / A2846 Post Consultant Limited 15,200.00 Signed 2020-08-01 2020-07-29 2020-08-06 2020-09-02 2020-08-27 2020-08-30 2020-10-01 2020-09-06 2021-06-28 for Sustainable Urban Growth at MOLG Selection GZ-MDLF-185236-CS-INDV Individual Component No. 1: Planning / Communication and Public TF / A2846 Post Consultant Open 5,250.00 Signed 2020-08-01 2020-07-29 2020-09-19 2020-11-05 2020-10-10 2020-11-19 2020-11-14 2020-11-22 2021-08-11 for Sustainable Urban Growth Relation Specialist Selection GZ-MDLF-164008-CS-QCBS Individual / Prepare the Spatial Component No. 1: Planning Pending TF / A2846 Post Consultant Open 0.00 2020-10-01 2020-11-19 2020-12-10 2021-01-14 2021-09-11 development Framework for for Sustainable Urban Growth Implementation Selection Gaza City GZ-MDLF-201721-CS-INDV Individual Component No. 1: Planning / Junior Urban Planner @ TF / A2846 Post Consultant Limited 11,550.00 Signed 2020-11-04 2020-11-12 2020-11-09 2020-11-30 2020-11-30 2020-11-30 2021-01-04 2020-12-01 2021-07-03 for Sustainable Urban Growth MOLG Selection GZ-MDLF-222304-CS-INDV Individual Component No. 1: Planning / Practical Training on Market- TF / A2846 Post Consultant Direct 17,325.00 Signed 2021-03-15 2021-03-24 2021-03-25 2021-03-31 2021-04-15 2021-03-29 2021-05-20 2021-04-06 2021-11-16 for Sustainable Urban Growth Oriented Urban Planning Selection GZ-MDLF-233801-CS-INDV / Technical Support and Capacity Building for the Pilot Individual Component No. 1: Planning Under Project "Installation of Solar TF / A2846 Post Consultant Limited 0.00 2021-06-01 2021-05-27 2021-06-06 2021-06-27 2021-08-01 2022-04-28 for Sustainable Urban Growth Implementation Photovoltaic Systems for Selection Targeted Urban Areas in West Bank" GZ-MDLF-233803-CS-INDV / Technical Support and Individual Capacity Building for the Pilot Component No. 1: Planning Under TF / A2846 Post Consultant Limited 0.00 2021-06-01 2021-05-27 2021-06-06 2021-06-27 2021-08-01 2022-01-28 Project "Installation of Solar for Sustainable Urban Growth Implementation Selection Photovoltaic Systems for Gaza Urban Area Page 4 PROCUREMENT PLAN (Textual Part) Project information: BURUNDI INVESTING IN EARLY YEARS IN BURUNDI - NKURIZA P165253 Project Implementation agency: MINISTRY OF HEALTH AND FIGHT AGAIST AIDS Date of the Procurement Plan: January 10, 2019 Period covered by this Procurement Plan: January 2019 - August 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the country procurement handbook, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. - The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. - Rights for the Bank to review procurement documentation and activities. - An effective complaints mechanism. - Maintenance of records of the Procurement Process When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable Works: is not applicable PROCUREMENT Burundi : Investing in Early Years and Fertility in Burundi (NKURIZA) PLAN General Information Country: Burundi Bank’s Approval Date of the Original Procurement Plan: 2019-01-11 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165253 GPN Date: Project Name: Investing in Early Years and Fertility in Burundi (NKURIZA) Loan / Credit No: IDA / V2270, IDA / D5140 Burundi-Ministry of Health Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-BI-MOH-164402-GO-RFQ Pending / Equipement informatique Strengthening institutions, Request for Single Stage - One IDA / V2270 Post Limited 45,000.00 0.00 Implementati 2020-08-15 2020-10-10 2020-12-09 (ordinateur, imprimantes, leadership and monitoring Quotations Envelope on photocopieuse...) BI-BI-MOH-164421-GO-RFB Community interventions to / Doter les agents formés en Pending increase coverage of nutrition Single Stage - One intrants pour la prise en IDA / V2270 Post Request for Bids Open - National 355,000.00 0.00 Implementati 2020-11-25 2020-11-30 2021-01-11 2021-02-10 2021-03-17 2021-03-26 services and utilization of Envelope charge du paludisme, de la on family planning services diarrhée et de la pneumonie BI-BI-MOH-169155-GO-RFQ Strengthening institutions, Request for Single Stage - One / Acquisition d' équipement IDA / V2270 Post Limited 32,360.00 30,871.00 Completed 2020-05-02 2020-04-28 2020-06-04 2020-06-28 2020-06-19 2020-07-23 leadership and monitoring Quotations Envelope informatique pour télétravail BI-BI-MOH-164394-GO-RFB Under / Achat de 8 véhicules pour Strengthening institutions, Single Stage - One IDA / D5140 Post Request for Bids Open - National 456,000.00 0.00 Implementati 2021-04-20 2021-04-08 2021-04-25 2021-04-08 2021-06-07 2021-06-22 2021-07-16 2021-09-14 la supervision et la leadership and monitoring Envelope on coordination provinciale du projet BI-BI-MOH-227070-GO-DIR Community interventions to / Achat des kits et des increase coverage of nutrition produits contraceptifs via IDA / D5140 Prior Direct Selection Direct 3,352,165.00 3,143,309.04 Signed 2021-04-15 2021-04-08 2021-04-20 2021-04-15 2021-05-30 2021-05-20 2023-05-20 services and utilization of FNUAP pour les 6 provinces family planning services d' intervention du projet BI-BI-MOH-227101-GO-DIR Community interventions to / Achat des kits et intrants Under increase coverage of nutrition nutritionnels via UNICEF pour IDA / D5140 Prior Direct Selection Direct 2,017,700.00 0.00 Implementati 2021-04-15 2021-04-08 2021-04-20 2021-04-15 2021-05-29 2023-05-19 services and utilization of les 6 provinces d' on family planning services intervention du projet NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-BI-MOH-164115-CS-LCS / Recrutement d' un Auditeur comptable et financier du Strengthening institutions, Least Cost Pending IDA / V2270 Post Open 60,000.00 0.00 2021-01-10 2021-01-31 2021-03-16 2021-04-13 2021-05-13 2021-06-17 2021-07-22 2021-09-05 projet pour le PPA et l' leadership and monitoring Selection Implementation exercice allant d' Avril 2020 à juin 2021 BI-BI-MOH-164132-CS- QCBS / Recrutement d'une Community interventions to ONG pour la mise en œuvre increase coverage of nutrition Quality And Cost- Pending des interventions intégré de IDA / V2270 Post Open 1,200,000.00 0.00 2020-07-15 2020-08-05 2020-09-08 2020-10-06 2020-11-05 2020-12-10 2021-01-14 2023-01-04 services and utilization of Based Selection Implementation nutrition et PF à base family planning services communautaire dans la province de MAKAMBA BI-BI-MOH-164135-CS- QCBS / Recrutement d'une Community interventions to ONG pour la mise en œuvre increase coverage of nutrition Quality And Cost- Pending des interventions intégrées de IDA / V2270 Post Open 1,200,000.00 0.00 2020-07-15 2020-08-05 2020-09-08 2020-10-06 2020-11-05 2020-12-10 2021-01-14 2023-01-04 services and utilization of Based Selection Implementation nutrition et de PF à base family planning services communautaire dans la province de Bubanza BI-BI-MOH-164133-CS- QCBS / Recrutement d'une Community interventions to ONG pour la mise en œuvre increase coverage of nutrition Quality And Cost- Pending des interventions intégrées de IDA / V2270 Post Open 1,200,000.00 0.00 2020-07-15 2020-08-05 2020-09-08 2020-10-06 2020-11-05 2020-12-10 2021-01-14 2023-01-04 services and utilization of Based Selection Implementation nutrition et de PF à base family planning services communautaire dans la province de CIBITOKE BI-BI-MOH-164120-CS- QCBS / Recrutement d'une Community interventions to ONG pour la mise en œuvre increase coverage of nutrition Quality And Cost- Pending des interventions intégré de IDA / V2270 Post Open 1,200,000.00 0.00 2020-07-15 2020-08-05 2020-09-08 2020-10-06 2020-11-05 2020-12-10 2021-01-14 2023-01-04 services and utilization of Based Selection Implementation nutrition et PF à base family planning services communautaire dans la province de KIRUNDO Page 1 BI-BI-MOH-164128-CS- QCBS / Recrutement d'une Community interventions to ONG pour la mise en œuvre increase coverage of nutrition Quality And Cost- Pending des interventions intégrées de IDA / V2270 Post Open 1,200,000.00 0.00 2020-07-15 2020-08-05 2020-09-08 2020-10-06 2020-11-05 2020-12-10 2021-01-14 2023-01-04 services and utilization of Based Selection Implementation nutrition et de PF à base family planning services communautaire dans la province de MUYINGA BI-BI-MOH-164130-CS- QCBS / Recrutement d'une Community interventions to ONG pour la mise en œuvre increase coverage of nutrition Quality And Cost- Pending des interventions intégrées de IDA / V2270 Post Open 1,200,000.00 0.00 2020-07-15 2020-08-05 2020-09-08 2020-10-06 2020-11-05 2020-12-10 2021-01-14 2023-01-04 services and utilization of Based Selection Implementation nutrition et de PF à base family planning services communautaire dans la province de Cankuzo BI-BI-MOH-164116-CS-LCS Community interventions to / Recrutement d'une ONG increase coverage of nutrition Quality And Cost- Pending pour la mise en oeuvre du IDA / V2270 Post Open 150,000.00 0.00 2020-11-16 2020-12-07 2021-01-10 2021-02-07 2021-03-09 2021-04-13 2021-05-12 2022-05-12 services and utilization of Based Selection Implementation CPPA ( cadre pour les family planning services populations autochtones) BI-BI-MOH-99489-CS-QCBS Community interventions to / Recrutement d'un bureau en increase coverage of nutrition Quality And Cost- Under vue de l' établissement d'une IDA / V2270 Post Open - National 45,000.00 0.00 2020-05-26 2020-06-23 2020-06-05 2020-06-24 2020-07-19 2020-08-16 2020-09-15 2020-10-20 2020-11-18 2021-02-16 services and utilization of Based Selection Implementation table de composition des family planning services aliments au Burundi INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-BI-MOH-94488-CS-INDV / Etude sur les déterminants Community interventions to Individual de la malnutrition chronique increase coverage of nutrition Under IDA / V2270 Post Consultant Open 40,000.00 0.00 2019-01-30 2019-05-26 2019-03-20 2019-04-10 2019-05-15 2019-07-14 et du taux élevé de fécondité services and utilization of Implementation Selection dans les zones d'exécution du family planning services projet BI-BI-MOH-94489-CS-INDV Community interventions to / Etude sur la mise en place Individual increase coverage of nutrition d'une base de données sur la IDA / V2270 Post Consultant Open 45,000.00 0.00 Canceled 2019-02-03 2019-05-26 2019-03-24 2019-04-14 2019-05-19 2019-07-18 services and utilization of nutrition dans les zones Selection family planning services d'exécution du projet BI-BI-MOH-94490-CS-INDV / Etude sur l'évaluation des Individual besoins en renforcement de Strengthening institutions, Pending IDA / V2270 Post Consultant Open 50,000.00 0.00 2019-02-04 2019-03-25 2019-04-15 2019-05-20 2019-08-18 capacité institutionnelle sur le leadership and monitoring Implementation Selection système de santé nutritionnelle BI-BI-MOH-94491-CS-INDV / Etude sur les prestations des Individual Agents de Santé Strengthening institutions, Under IDA / V2270 Post Consultant Open 50,000.00 0.00 2019-02-04 2019-04-12 2019-03-25 2019-04-15 2019-05-20 2019-08-18 Communautaires (ASC) leadership and monitoring Implementation Selection impliqués dans la lutte contre la malnutrition BI-BI-MOH-94494-CS-INDV Individual Strengthening institutions, Under / Recrutement d'un comptable IDA / V2270 Post Consultant Open 36,000.00 0.00 2019-02-26 2020-04-30 2019-04-16 2019-05-07 2019-06-11 2020-06-05 leadership and monitoring Implementation du Projet Selection BI-BI-MOH-94493-CS-INDV Individual / Recrutement d'un consultant Strengthening institutions, IDA / V2270 Post Consultant Direct 26,000.00 29,800.55 Completed 2019-01-21 2019-01-22 2019-01-27 2019-01-23 2019-02-01 2019-02-13 2019-02-09 2019-01-24 2019-02-19 2019-03-08 individuel pour l'élaboration leadership and monitoring Selection du PPSD du projet NKURIZA BI-BI-MOH-164077-CS-INDV Individual / Recrutement du directeur Strengthening institutions, Under IDA / V2270 Post Consultant Open 190,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 technique pour la mise en leadership and monitoring Implementation Selection oeuvre du projet BI-BI-MOH-164080-CS-INDV / Recrutement du Individual Strengthening institutions, Under coordonnateur provincial de IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation KIRUNDO pour la mise en Selection œuvre du projet BI-BI-MOH-164081-CS-INDV / Recrutement du Individual Strengthening institutions, Under coordonnateur provincial de IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation MUYINGA pour la mise en Selection œuvre du projet BI-BI-MOH-164086-CS-INDV / Recrutement du Individual Strengthening institutions, Under coordonnateur provincial de IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation CANKUZO pour la mise en Selection œuvre du projet BI-BI-MOH-164090-CS-INDV / Recrutement du Individual Strengthening institutions, Under coordonnateur provincial de IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation MAKAMBA pour la mise en Selection œuvre du projet BI-BI-MOH-164095-CS-INDV / Recrutement du Individual Strengthening institutions, Under coordonnateur provincial de IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation CIBITOKE pour la mise en Selection œuvre du projet BI-BI-MOH-164098-CS-INDV / Recrutement du Individual Strengthening institutions, Under coordonnateur provincial de IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation BUBANZA pour la mise en Selection œuvre du projet Page 2 BI-BI-MOH-164100-CS-INDV Individual Strengthening institutions, Under / Recrutement d’un expert en IDA / V2270 Post Consultant 84,000.00 0.00 2020-04-21 2021-02-04 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation nutrition Selection BI-BI-MOH-164103-CS-INDV Individual Strengthening institutions, Under / Recrutement d’un expert en IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation WASH Selection BI-BI-MOH-164106-CS-INDV Individual Strengthening institutions, Under / Recrutement d’un expert en IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation agriculture Selection BI-BI-MOH-164108-CS-INDV / Recrutement d’un expert en Individual Strengthening institutions, Under communication pour le IDA / V2270 Post Consultant Open 84,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation changement de Selection comportement BI-BI-MOH-164111-CS-INDV Individual Strengthening institutions, Under / Recrutement d’un chargé IDA / V2270 Post Consultant Open 66,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation des opérations Selection BI-BI-MOH-164112-CS-INDV Individual Strengthening institutions, Under / Recrutement d’un expert en IDA / V2270 Post Consultant Open 66,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation Suivi-Evaluation Selection BI-BI-MOH-164113-CS-INDV Individual Strengthening institutions, Under / Recrutement d'un auditeur IDA / V2270 Post Consultant Open 66,000.00 0.00 2020-04-21 2020-04-30 2020-06-05 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation Interne au projet Selection BI-BI-MOH-164348-CS-INDV Individual Strengthening institutions, Under / Recrutement d' un IDA / V2270 Post Consultant Open 66,000.00 0.00 2020-04-21 2020-06-09 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation logisticien pour le projet Selection BI-BI-MOH-164109-CS-INDV Individual Strengthening institutions, Under / Recrutement d’un expert IDA / V2270 Post Consultant 66,000.00 0.00 2020-04-21 2020-05-28 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring Implementation en passation des marchés Selection BI-BI-MOH-165338-CS-INDV Individual / Recrutement d' un expert en Strengthening institutions, Under IDA / V2270 Post Consultant Open 66,000.00 0.00 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 sauvegarde environnementale leadership and monitoring Implementation Selection et sociale BI-BI-MOH-180611-CS-INDV Individual / Recrutement d' un virologue Contingency Emergency Under IDA / V2270 Post Consultant Open 36,000.00 0.00 2020-06-25 2020-06-23 2020-08-11 2020-08-21 2020-09-07 2021-09-02 junior faisant partie du staff Response Component (CERC) Implementation Selection du projet BI-BI-MOH-164102-CS-INDV Individual Strengthening institutions, / Recrutement d’un expert en IDA / V2270 Post Consultant Open 84,000.00 0.00 Canceled 2020-04-21 2020-05-19 2020-05-31 2020-06-10 2020-07-02 2022-06-22 leadership and monitoring santé et planning familial Selection BI-BI-MOH-235540-CS-INDV Individual / Recrutement d' un Strengthening institutions, Under IDA / D5140 Post Consultant Open 24,000.00 0.00 2021-05-31 2021-06-01 2021-07-14 2021-07-24 2021-08-24 2022-02-20 consultant en planning leadership and monitoring Implementation Selection familial du projet NKURIZA BI-BI-MOH-238878-CS-CDS / RECRUTEMENT D’UN CHEF CUISINIER COCO REINARHZ Community interventions to POUR ANIMATION DE LA increase coverage of nutrition Under IDA / D5140 Post Direct Selection Direct 10,000.00 0.00 2021-06-09 2021-06-09 2021-06-11 2021-06-16 2021-06-26 CAMPAGNE DE services and utilization of Implementation COMMUNICATION SOCIALE DE family planning services CHANGEMENT DES HABITUDES ALIMENTAIRES Page 3 TNRTP- P157702- Procurement Arrangements and Thresholds- SUBSTANTIAL RISK 1. Procurement for the proposed project will be carried out in accordance with the Bank’s Procurement Regulations for Borrowers for Goods, Works, Non- Consulting and Consulting Services dated July 1, 2016 and applicable to Investment Project Financing (IPF) here in after referred to as “Regulations”. The project will be subject to the Bank’s anticorruption Guidelines3, dated October 15, 2006, and revised in January 2011 and as of July 1, 2016. 2. As per the requirement of the Regulations, a Project Procurement Strategy Document (PPSD) has been developed, based on which the procurement plan has been prepared and sets out the selection methods to be followed by the Borrower during project implementation in the procurement of goods, works, non-consulting and consulting services financed by the Bank. The Procurement Plan will be updated annually for larger procurements like NCB or as required to reflect the actual project implementation needs and improvements in institutional capacity. 3. Procurement methods: The table below describes various procurement methods to be used for activities financed by the loan. These along with agreed thresholds will be reproduced in the procurement plan. The thresholds indicated in the following table apply to the initial 18 month implementation period and are based on the procurement performance of the project; these thresholds may be subsequently modified. Table 7 – Procurement method threshold Thresholds for Procurement Thresholds (US$ equivalent) Approaches and Methods Open International (Goods, IT and > 3 million non-consulting services) Open National (Goods, IT and non- > 100,000 and up to 3 million consulting services) National Request For Quotation Up to 100,000 (Goods / Works) Open International (Works) > 40 million Open National (Works) > 100,000 and up to 40 million Direct Selection No threshold; For Goods / Works / non-consulting services: As per paragraph 6.8-6.10 of Regulation. For Consultants: As per paragraph 7.13-7.15 of Regulation. Shortlist of National Consultants Up to 800,000 4. Procurement Prior Review Thresholds: The World Bank will prior review (thresholds are based on SUBSTANTIAL rating) the following contracts: a) Works: All contracts more than US$ 10 million equivalent b) Goods and Information Technology: All contracts more than US$ 2 million equivalent c) Non-Consulting Services: All contracts more than US$ 2 million equivalent; d) Consultants: All contracts > US$ 1 million equivalent for firms and > US$ 300,000 equivalent for individuals. e) Direct Selection: All contracts more than US$ 100,000 equivalent 5. The above thresholds are for the initial 18 month implementation period; based on the procurement performance of the project these thresholds may be subsequently modified. Even for large value Post Review cases, the inputs of Bank on Technical Specifications / TORs will be obtained by project. The prior review thresholds will also be indicated in the procurement plan. The procurement plan will be subsequently updated annually (or at any other time if required) and will reflect any change in prior review thresholds. The prior review thresholds will be mutually reviewed during project implementation and modified based on the risk assessment. 6. In the case of contracts subject to prior review, the Implementing Agency shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non- consulting services or consulting services, other significant changes to the terms and conditions of the contract; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; (d) the proposed termination of the contract. 7. National Procurement Procedure Conditions: National competition for the procurement of goods, works and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3 – 5.5 of Section V of the Regulations and the following provisions: (a) Only the model bidding documents agreed with the GoI task force (and as amended for time to time) shall be used for bidding. (b) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids. (c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises, or enterprises from any given state. (d) Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer). (e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project. (f) Rate contracts entered into by the Directorate General of Supplies and Disposals (DGS&D) will not be acceptable as a substitute for national competition procedures unless incorporation of right to audit and fraud corruption clauses. DGS&D contracts and its new version will be acceptable, however, for any procurement under the shopping procedures. (g) No negotiations are conducted even with the lowest evaluated responsive bidders. 8. Domestic Preference. The provision of domestic preference will be applied in the evaluation of bids in accordance with Annex VI of the Regulations. 9. Record keeping. All records pertaining to award of tenders, including bid notification, register pertaining to sale and receipt of bids, bid opening minutes, bid evaluation reports and all correspondence pertaining to bid evaluation, communication sent to/with the Bank in the process, bid securities, and approval of invitation/evaluation of bids would be retained by IAs. 10. Disclosure of procurement information. The following documents shall be disclosed on the project/state websites: (a) a Procurement Plan and updates; (b) an invitation for bids for goods and works for all contracts; (c) request for expression of interest for selection/hiring of consulting services; (d) contract awards of goods and works procured following international and national procedures; (e) a list of contracts/ purchase orders placed following shopping procedures on a quarterly basis; (f) a list of contracts following direct contracting (DC) on a quarterly basis; (g) a monthly financial and physical progress report of all contracts; and (h) an action taken report on the complaints received on a quarterly basis. 11. The following details shall be sent to the Bank for publishing on the United Nations Development Bank and Bank external website: (a) an invitation for bids for procurement of goods and works using open international procedures; (b) contract award details of all procurement of goods and works using open international procedure; and (c) a list of contracts/ purchase orders placed following DC procedures on a quarterly basis. 12. Further, SPIU will also publish on their website any information required under the provisions of ‘suo moto’ disclosure as specified by the Right to Information Act. 13. Oversight and Monitoring by the Bank. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. To avoid doubts, the Bank may conduct, at any time, Independent Procurement Reviews of all the contracts financed under the loan. 14. The high risk and high value procurements, if any will be identified for increased contract management support and indicated in the procurement plan. The SPIU will develop key performance indicators (KPIs) for such identified contracts and the KPIs would be monitored during actual execution of contracts. Bank team will provide additional due diligence and independent review of the contract performance of such identified procurements. Frequency of procurement supervision, the World Bank will normally carry out implementation support missions, including review and support on procurement, on a semi-annual basis. Mission frequency may be increased or decreased based on the procurement performance of the project. *** PROCUREMENT India : Tamil Nadu Rural Transformation Project (TNRTP) PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2018-12-05 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157702 GPN Date: Project Name: Tamil Nadu Rural Transformation Project (TNRTP) Loan / Credit No: IBRD / 87950 Tamil Nadu Rural Transformation Society Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 058/TNRTP/2018 / Project Management, Results Refurbishment of Identified Monitoring and Single Stage - One 2019-05- Space for Setting up of State IBRD / 87950 Post Request for Bids Open - National 384,615.00 0.00 Canceled 2018-12-07 2018-12-12 2019-01-11 2019-01-18 2019-02-01 Implementation Support Envelope 02 Project Management Unit Systems (SPMU) IN-TNRTS-152334-CW-RFB / Project Management, Results Office Refurbishment for State Monitoring and Single Stage - One 2020-05- IBRD / 87950 Post Request for Bids Open - National 214,285.00 211,732.61 Signed 2019-12-30 2019-12-31 2020-01-05 2020-05-13 2020-02-05 2020-02-18 2020-02-12 2020-05-11 2020-02-26 2020-06-15 Project Management Unit of Implementation Support Envelope 26 TNRTP. Systems GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Management, Results 043/TNRTP/2018 / Purchase Monitoring and Request for Single Stage - One IBRD / 87950 Post Limited 70,000.00 46,501.12 Signed 2018-12-20 2018-12-20 2019-01-04 2018-12-29 2019-02-03 of Vehicles for SPMU of TNRTP Implementation Support Quotations Envelope Systems ROC.NO.045/TNRTP/2018 / Project Management, Results Purchase of Desktops, Monitoring and Request for Single Stage - One IBRD / 87950 Post Open - National 57,392.00 50,862.42 Signed 2019-10-01 2019-11-26 2019-09-23 2020-05-24 Laptops and Printers in TNRTP Implementation Support Quotations Envelope SPMU Systems ROC.NO.101/TNRTP/2018 / Project Management, Results Printing of Diaries, Note Monitoring and Request for Single Stage - One IBRD / 87950 Post Open - National 34,632.00 34,544.81 Signed 2019-11-23 2020-01-18 2019-10-23 2020-07-16 Books, Binding Pads & Implementation Support Quotations Envelope Wrapper Sheets Systems 090/TNRTP/2019 / Printing of PGP Manuals for Rural Enterprise Ecosystem Request for Single Stage - One IBRD / 87950 Post Limited 20,000.00 18,346.76 Signed 2020-02-12 2019-12-03 2020-04-08 2019-12-18 2020-10-05 Participatory Growth plan Development Quotations Envelope exercise ROC NO:90A/TNRTP/2019 / Rural Enterprise Ecosystem Request for Single Stage - One Designing and printing of PGP IBRD / 87950 Post Limited 70,140.00 52,738.34 Signed 2020-03-22 2020-03-19 2020-05-17 2020-03-30 2020-11-13 Development Quotations Envelope pamphlet for PGP exercise 29/TNRTP/2020 / Printing of Project Management, Results Vouchers,Registers and Monitoring and Request for Single Stage - One binding pads for DPMU,BPMU IBRD / 87950 Post Limited 15,567.00 13,621.03 Signed 2020-05-31 2020-01-03 2020-07-26 2020-01-14 2021-01-22 Implementation Support Quotations Envelope and SPMU office use for Systems TNRTP ROC.NO:045A/TNRTP/2018 / Project Management, Results Purchase of Printers, Monitoring and Request for Single Stage - One IBRD / 87950 Post Limited 5,000.00 960.39 Signed 2020-06-27 2020-07-31 2020-08-22 2020-08-17 2021-02-18 Laptop/Ipad, and CCTV Implementation Support Quotations Envelope camera for TNRTP SPMU. Systems ROC.NO:045B/TNRTP/2018 / Project Management, Results Fully Digital conference hall Monitoring and Request for Single Stage - One IBRD / 87950 Post Limited 38,237.00 17,249.28 Signed 2020-08-21 2020-08-24 2020-10-16 2021-01-13 2021-04-14 for the new office at TNSIDCO Implementation Support Quotations Envelope Complex Systems ROC.NO.1133/EED/2020 / Rural Enterprise Ecosystem Request for Single Stage - One Printing of Loan repayment IBRD / 87950 Post Limited 14,935.04 7,522.49 Signed 2020-10-31 2021-01-14 2020-12-26 2020-12-31 2021-06-24 Development Quotations Envelope Register for IE,IA & SYMR 1363/EED/PGP/2020 / Printing of PGP IEC Material Rural Enterprise Ecosystem Request for Single Stage - One IBRD / 87950 Post Limited 4,062.76 3,063.70 Signed 2020-12-09 2020-12-04 2021-02-03 2020-12-21 2021-08-02 and Ready Reckoner for PGP Development Quotations Envelope Exercise 1446/P&C/2020 / Purchase Project Management, Results of Server and printer for Tally Monitoring and Request for Single Stage - One IBRD / 87950 Post Limited 2,000.00 2,206.80 Signed 2020-12-26 2020-12-22 2021-02-20 2021-01-08 2021-08-19 software Accounts section Implementation Support Quotations Envelope under TNRTP Systems ROC.NO: Project Management, Results 1505/KMC/TNRTP/2020 / Monitoring and Request for Single Stage - One IBRD / 87950 Post Limited 5,430.00 9,715.52 Signed 2020-12-29 2021-01-13 2021-02-23 2021-01-27 2021-08-22 Printing of Diaries and Implementation Support Quotations Envelope Calender for TNRTP Systems ROC.NO: 1506/EED/TNRTP/2020 / Printing of ECPs Guidelines Rural Enterprise Ecosystem Request for Single Stage - One IBRD / 87950 Post Limited 6,109.00 3,899.38 Signed 2021-01-02 2021-01-11 2021-02-27 2021-01-25 2021-08-26 and IEC material for Enterprise Development Quotations Envelope Community professional in TNRTP Project Management, Results ROC.NO.005/TNRTP/2018 / Monitoring and Purchase of Sofa/Furniture for IBRD / 87950 Post Direct Selection Direct 1,508.00 1,500.84 Signed 2021-02-04 2021-02-04 2021-02-09 2021-02-08 2021-03-16 2021-02-09 2021-09-12 Implementation Support TNRTP office Systems Page 1 Project Management, Results 2016/MIS/2021 / Purchase Under Monitoring and Request for Single Stage - One of UPS and network switches IBRD / 87950 Post Limited 2,535.00 0.00 Implementati 2021-04-26 2021-06-03 2021-06-21 2021-12-18 Implementation Support Quotations Envelope for SPMU on Systems ROC.NO.3029/BPF/2021 / Designing and Printing of MGP Under Enterprise Business Plan Request for Single Stage - One Manual, MGP handbook, and IBRD / 87950 Post Limited 20,000.00 18,265.12 Implementati 2021-06-01 2021-05-27 2021-07-27 2022-01-23 Financing Quotations Envelope MGP training manuals for on TNRTP Staffs NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 099/TNRTP/2018 / Selecting Project Management, Results an Outsourcing Agency for Monitoring and Request for Single Stage - One IBRD / 87950 Post Limited 30,000.00 2,356.92 Signed 2018-12-20 2019-02-18 2019-01-07 2019-05-31 2020-01-07 recruiting Non-Technical Implementation Support Quotations Envelope Basic staff for TNRTP Systems 098/TNRTP/2018 / Taking Project Management, Results Video film and Documentary Monitoring and Request for Single Stage - One IBRD / 87950 Post Limited 96,000.00 83,956.87 Signed 2018-12-24 2018-12-21 2019-01-10 2018-12-28 2019-03-26 about TNRTP and its Implementation Support Quotations Envelope components Systems Project Management, Results 43/TNRTP/2018 / Hiring of Monitoring and Request for Single Stage - One IBRD / 87950 Post Limited 37,000.00 601.47 Signed 2018-12-22 2018-12-20 2019-01-01 2018-12-31 2019-01-03 Vehicles for SPMU of TNRTP Implementation Support Quotations Envelope Systems Project Management, Results 1316/A/2020/T1 / The Monitoring and Request for Single Stage - One hiring of Vehicles for SPMU of IBRD / 87950 Post Limited 37,984.82 6,108.87 Signed 2020-12-19 2020-12-16 2021-02-13 2021-01-05 2021-08-12 Implementation Support Quotations Envelope TNRTP Systems CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 096/TNRTP/2018 / Hiring of Agency for Capacity Building Rural Enterprise Ecosystem Quality And Cost- Support for Development and IBRD / 87950 Prior Open - National 2,000,000.00 1,680,270.92 Signed 2018-12-15 2019-12-04 2018-12-20 2019-01-19 2019-04-09 2019-02-18 2019-05-28 2019-02-28 2019-12-27 2019-03-13 2020-03-11 2019-04-17 2020-05-22 2022-04-16 Development Based Selection Strengthening for Producer Collectives under TNRTP. Consultant 381/TNRTP/2017 / Matching Enterprise Business Plan IBRD / 87950 Post Qualification Open - National 21,000.00 43,940.35 Signed 2019-01-31 2019-02-19 2019-02-21 2019-03-17 2019-08-21 2019-04-16 2019-10-18 2019-05-21 2019-11-22 2019-11-17 Grants Program Financing Selection 002-A/TNRTP/2019 / Project Management, Results Consultant Statutory Auditor Monitoring and IBRD / 87950 Post Qualification Limited 4,500.00 0.00 Canceled 2019-04-05 2019-04-19 2019-05-04 2019-05-18 2022-05-17 procurement for 3 Years Implementation Support Selection (2018-19,2019-20 and 2020- Systems 21) 001/TNRTP/2019 / Internal Project Management, Results Auditor procurement for 3 Monitoring and Least Cost Years (2019-20,2020-21 and IBRD / 87950 Post Open - National 90,270.00 0.00 Canceled 2019-04-05 2019-09-25 2019-04-26 2019-06-09 2019-07-07 2019-07-22 2019-08-26 2019-09-30 2022-09-29 Implementation Support Selection 2021-22) - Converted Rupees Systems in Current Dollar Rate (68.76) ROC.NO.051/TNRTP/2019 / Transaction Manager is an agency who will identify and Enterprise Business Plan Quality And Cost- enter into partnership with IBRD / 87950 Post Open - National 249,000.00 0.00 Canceled 2019-09-25 2019-10-17 2019-10-16 2019-11-29 2019-12-27 2020-01-26 2020-03-01 2020-04-05 2021-04-05 Financing Based Selection different financial Institution for implementation of Matching Grant Program. ROC.NO.122/MIS/2019 / System Integrator to Design, Project Management, Results Develop, Deploy and Monitoring and Quality And Cost- IBRD / 87950 Prior Open - National 1,714,286.00 925,175.63 Signed 2019-12-03 2019-12-30 2019-12-24 2020-02-09 2020-02-06 2020-03-31 2020-03-05 2020-05-21 2020-04-04 2020-11-13 2020-05-09 2020-12-14 2020-06-13 2021-01-06 2021-06-13 Operation & Maintenance(OM) Implementation Support Based Selection of Integrated Digital Platform Systems for TNRTP. 068/TNRTP/2019 / Hiring agency to design, develop and Project Management, Results effectively deploy the Monitoring and Quality And Cost- IBRD / 87950 Post Open - National 500,000.00 365,795.96 Signed 2020-01-05 2020-01-06 2020-01-26 2020-02-24 2020-03-10 2020-07-07 2020-04-07 2020-08-10 2020-05-07 2020-08-13 2020-06-11 2020-08-29 2020-07-16 2020-10-01 2021-07-16 knowledge management and Implementation Support Based Selection communication strategy for Systems the project . ROC.NO 02/TNRTP/ESMF/2020 / Hiring State Resource Project Management, Results Environment Agency for Monitoring and Quality And Cost- Under developing EA tools, EMF IBRD / 87950 Post Open - National 147,158.78 0.00 2020-02-10 2020-02-13 2020-03-02 2020-02-26 2020-04-15 2020-07-11 2020-05-13 2020-08-11 2020-06-12 2020-08-18 2020-07-17 2020-08-21 2021-08-21 Implementation Support Based Selection Implementation manual, Capacity Building, Systems Environment Audit and Internal Monitoring of EMF implementation. ROC.NO.002-B/TNRTP/2019 Project Management, Results Consultant / Statutory Auditor Monitoring and IBRD / 87950 Post Qualification Limited 47,285.00 0.00 Canceled 2020-02-14 2020-03-20 2020-02-28 2020-03-29 2020-05-03 2020-10-30 procurement for 3 Years Implementation Support Selection (2019-20,2020-21 and 2021- Systems 22) 001A/TNRTP/2019 / Internal Project Management, Results Auditor procurement for 3 Monitoring and Quality And Cost- Years (2020-21,2021-22 and IBRD / 87950 Post Open 84,818.00 30,774.45 Signed 2020-03-18 2020-05-18 2020-04-08 2020-06-13 2020-05-22 2020-07-28 2020-06-19 2020-08-27 2020-07-19 2020-09-03 2020-08-23 2020-10-09 2020-09-27 2020-10-15 2021-09-27 Implementation Support Based Selection 2022-23) - Converted Rupees Systems in Current Dollar Rate (73.18) Page 2 ROC.NO.002B/TNRTP/2019 / Project Management, Results Statutory auditor procurement Monitoring and Quality And Cost- IBRD / 87950 Post Open - National 47,285.00 16,473.16 Signed 2020-05-27 2020-05-27 2020-06-17 2020-07-24 2020-07-31 2020-08-29 2020-08-28 2020-09-28 2020-09-27 2020-09-30 2020-11-01 2020-10-23 2020-12-06 2020-10-31 2021-12-06 for 3 Years ( 2019-20, 2020 - Implementation Support Based Selection 21 and 2021 - 2022 ) Systems ROC.NO.1012/BPF/2020 / Technical Support agency for Enterprise Business Plan Quality And Cost- Under capacity building support to IBRD / 87950 Post Open - National 339,432.71 0.00 2020-10-26 2020-10-28 2020-11-16 2020-12-05 2020-12-30 2021-02-02 2021-01-27 2021-02-26 2021-04-02 2021-05-07 2022-05-07 Financing Based Selection Implementation Enterprise Business plan financing INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Management, Results 002/TNRTP/2019 / Statutory Monitoring and Auditor procurement for 2017- IBRD / 87950 Post Direct Selection Direct 1,500.00 1,371.58 Signed 2019-02-14 2019-07-23 2019-02-17 2019-07-08 2019-02-20 2019-07-26 2019-03-12 Implementation Support 18 Systems ROC.NO.115/MIS/2019 / Developing a Field Level Data Rural Enterprise Ecosystem Capturing Mobile Application IBRD / 87950 Post Direct Selection Direct 41,907.00 38,163.04 Signed 2019-11-26 2019-11-26 2019-12-06 2019-11-12 2020-02-09 2019-12-10 2020-08-07 Development For Participatory Growth Plan (PGP) Exercise. ROC. NO: 496/KMC/TNRTP/2020 / Project Management, Results Engaging creative agency for Monitoring and IBRD / 87950 Post Direct Selection Direct 21,430.00 17,814.69 Signed 2020-05-27 2020-05-27 2020-06-06 2020-06-01 2020-08-10 2020-07-15 2021-02-06 TNRTP's Covid-19 Assistance Implementation Support Package (CAP) Communication Systems activities. ROC.NO:631/MIS/2020 / Design and Development of Project Management, Results Web Portal for TNRTP Project Monitoring and IBRD / 87950 Post Direct Selection Direct 24,000.00 13,433.55 Signed 2020-07-13 2020-07-14 2020-07-23 2020-07-14 2020-09-26 2020-07-22 2021-03-25 with integrated web Implementation Support application for COVID-19 Systems Assistance Package (CAP) ROC.NO: 309/FIN/2020 / PROCUREMENT/ Project Management, Results CUSTOMIZATION OFTALLY Monitoring and IBRD / 87950 Post Direct Selection Direct 11,321.00 8,963.67 Signed 2020-07-23 2020-07-25 2020-08-02 2020-07-31 2020-10-06 2020-08-26 2021-04-04 BASED FINANCIAL Implementation Support MANAGEMENT SYSTEM FOR Systems TNRTP ROC.NO:848/MIS/2020 / Project Management, Results Security Audit of the Web Monitoring and Portal developed for Tamil IBRD / 87950 Post Direct Selection Direct 5,445.00 3,423.43 Signed 2020-09-07 2020-09-16 2020-09-17 2020-10-13 2020-11-21 2020-11-20 2021-05-20 Implementation Support Nadu Rural Transformation Systems Project ROC.NO : 685/M&E/2020 / Project Management, Results Hiring External Monitoring & Monitoring and IBRD / 87950 Post Direct Selection Direct 88,415.53 74,140.03 Signed 2020-09-16 2020-09-17 2020-09-26 2020-09-18 2020-11-30 2020-10-15 2021-05-29 Evaluation Agency for COVID- Implementation Support 19 Assistance Package (CAP) Systems Page 3 PROCUREMENT PLAN (Textual Part) Project Country: Kyrgyz Republic information Full Project Name: Livelihoods for Youth Total Finance ($): USD 2.73 Mln Project Number: P165286 Project Implementation agency Public Foundation "Mountain Societies Development Support Programme" Date of the Procurement Plan June 20, 2019 Period covered by this Procurement June 2019 – June 2022 Plan: Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. PROCUREMENT Kyrgyz Republic : Livelihoods for Youth Community Support Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2019-07-11 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165286 GPN Date: 2019-05-28 Project Name: Livelihoods for Youth Community Support Project Loan / Credit No: TF / A8254 P Executing Agency(ies): ublic Foundation "Mountain Societies Development Support Programme" WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JSDF-LFYCSP-S-01 / Component 1: Preparing Request for Single Stage - One Procurement Computer TF / A8254 Post Open - National 12,100.00 10,453.61 Completed 2019-10-05 2019-09-02 2019-11-30 2019-10-07 2020-05-28 2019-11-05 Youth for the Labor Market Quotations Envelope equipment & accessories JSDF-LFYCSP-S-02 / Office Component 1: Preparing Request for Single Stage - One furniture (Desk, Chair, Filing TF / A8254 Post Open - National 9,000.00 5,076.07 Terminated 2019-12-05 2020-01-30 2020-01-13 2020-07-28 Youth for the Labor Market Quotations Envelope Cabinet and etc.) LFYCSP\OFFICE FURNITURE\S- 06\2020 / Office furniture Component 1: Preparing Request for Single Stage - One (Desk, Chair, Filing Cabinet TF / A8254 Post Open - National 9,000.00 4,555.50 Completed 2020-04-05 2020-06-25 2020-05-31 2020-08-17 2020-11-27 2020-09-24 Youth for the Labor Market Quotations Envelope and etc) for Bishkek, Osh, Batken and Jalal-Abad staff MSDSP KG-JSDF-LFYCSP-S- Component 2: Creating Under Request for Single Stage - One 05 / Equipment/supplies to TF / A8254 Market Opportunities for Post Open - National 90,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 Quotations Envelope common interest groups Youth on MSDSP KG-JSDF-LFYCSP-S- Under 04 / IT equipment to TVET Component 1: Preparing Request for Single Stage - One TF / A8254 Post Open - National 56,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 Centres and Professional Youth for the Labor Market Quotations Envelope on Lyceums MSDSP KG-JSDF-LFYCSP-S- 03 / Equipment for four video- Pending Component 1: Preparing Request for Single Stage - One based training courses around TF / A8254 Post Open - National 80,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 Youth for the Labor Market Quotations Envelope TVET and entrepreneurship on skills NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JSDF-LFYCSP-CQ-3 / Consultant Component 1: Preparing Consultant for market TF / A8254 Post Qualification Open - National 25,500.00 19,461.18 Completed 2019-06-13 2019-08-14 2019-06-27 2019-08-22 2019-07-16 2019-09-25 2019-07-21 2019-10-31 2019-08-05 2019-11-18 2019-12-29 2020-08-30 Youth for the Labor Market analyses Selection JSDF-LFYCSP-CQ-4 / Component 2: Creating Consultant Consultant for Value chain TF / A8254 Market Opportunities for Post Qualification Open - National 25,500.00 19,447.99 Completed 2019-04-19 2019-08-14 2019-05-10 2019-08-22 2019-06-23 2019-11-14 2019-07-23 2019-11-14 2019-08-27 2019-11-29 2020-02-23 2020-08-30 assessments in three target Youth Selection oblast JSDF\LFYCSP\AUDIT OF Component 3: Project LFYCSP\LCS-16 / Consulting Management and Least Cost service for Audit Livelihoods TF / A8254 Post Open - International 24,000.00 23,978.00 Signed 2019-11-30 2019-11-15 2019-12-21 2019-11-27 2020-02-03 2019-12-20 2020-03-02 2020-01-20 2020-04-01 2020-02-10 2020-05-06 2020-03-13 2020-06-10 2020-05-15 2020-12-07 Administration, M&E and Selection for Youth Community Support Knowledge Dissemination Project Component 3: Project MSDSP KG-JSDF-LFYCSP-CQ- Consultant Management and Pending 15 / Consulting company for TF / A8254 Post Qualification Open - National 30,000.00 0.00 2021-11-30 2021-12-21 2022-02-03 2022-03-05 2022-04-09 2022-10-06 Administration, M&E and Implementation Endline Studies Selection Knowledge Dissemination MSDSP KG-JSDF-LFYCSP-CQ- Component 3: Project Consultant 14 / Online Monitoring and Management and TF / A8254 Post Qualification Open - National 30,000.00 0.00 Canceled 2019-11-30 2020-06-25 2019-12-21 2020-02-03 2020-03-04 2020-04-08 2020-10-05 Evaluation System Administration, M&E and Selection Development Knowledge Dissemination MSDSPKG-LFYCSP-CQ 14- 2020 / Consultant for System Component 3: Project Consultant of Information Management Management and TF / A8254 Post Qualification Open - National 20,000.00 17,820.52 Signed 2020-08-31 2020-09-24 2020-09-21 2020-09-28 2020-11-04 2020-11-20 2020-12-04 2020-12-24 2021-01-08 2021-01-13 2021-07-07 online Monitoring and Administration, M&E and Selection Evaluation System Knowledge Dissemination Development MSDSPKG\LFYCSP\TR-CQ- 04\2020 / Consultant for Consultant Development of beginner and Component 1: Preparing TF / A8254 Post Qualification Open - National 70,000.00 0.00 Canceled 2020-08-31 2020-09-21 2020-11-04 2020-12-04 2021-01-08 2021-07-07 advanced ICT courses Youth for the Labor Market Selection curricula in TVET Centres and Professional Lyceums Page 1 MSDSPKG\LFYCSP\TR-CQ- Component 3: Project Consultant 01\2020 / Consultant for Management and TF / A8254 Post Qualification Open - National 12,000.00 13,267.08 Signed 2020-08-31 2020-08-17 2020-09-21 2020-08-23 2020-11-04 2020-10-01 2020-12-04 2020-10-13 2021-01-08 2020-10-29 2021-07-07 Training on VC development Administration, M&E and Selection for VC Facilitators Knowledge Dissemination MSDSPKG\LFYCSP\TR-CQ- 02\2020 / Consultant for Consultant Component 1: Preparing Basic entrepreneurship TF / A8254 Post Qualification Open - National 87,600.00 0.00 Canceled 2020-08-31 2020-09-21 2020-11-04 2020-12-04 2021-01-08 2021-07-07 Youth for the Labor Market training for out-of-school Selection youth MSDSPKG\LFYCSP\TR-CQ- Consultant 03\2020 / Consultant for Component 1: Preparing TF / A8254 Post Qualification Open - National 147,500.00 0.00 Canceled 2020-08-31 2020-09-21 2020-11-04 2020-12-04 2021-01-08 2021-07-07 Advanced entrepreneurship Youth for the Labor Market Selection training for youth MSDSPKG-LFYCSP-TR-CQ 05- 2020 / Consultant for Consultant Component 1: Preparing technical and vocational skills TF / A8254 Post Qualification Open - National 120,000.00 35,537.61 Signed 2020-11-30 2020-11-13 2020-12-21 2021-02-03 2020-12-15 2021-03-05 2021-01-15 2021-04-09 2021-02-01 2021-10-06 Youth for the Labor Market training for 12 TVET Selection professions Component 3: Project MSDSPKG-LFYCSP-CQ 20- Consultant Management and 2020 / Consulting company TF / A8254 Post Qualification Open - National 10,000.00 0.00 Canceled 2020-11-30 2020-12-21 2021-02-03 2021-03-05 2021-04-09 2021-10-06 Administration, M&E and for Baseline Studies Selection Knowledge Dissemination MSDSPKG-LFYCSP-TR-CQ 07- 2020 / Consultant for soft Consultant Component 1: Preparing skills development training for TF / A8254 Post Qualification Open - National 170,000.00 0.00 Canceled 2020-11-30 2020-12-21 2021-02-03 2021-03-05 2021-04-09 2021-10-06 Youth for the Labor Market Advanced Level in Osh, Batken Selection and Djalal-Abad oblast MSDSPKG-LFYCSP-TR-CQ 02- 2020 / Consultant for Basic Consultant Component 1: Preparing and Advanced TF / A8254 Post Qualification Open - National 235,100.00 59,020.11 Signed 2020-11-30 2020-11-13 2020-12-21 2021-02-03 2020-12-24 2021-03-05 2021-02-05 2021-04-09 2021-02-20 2021-10-06 Youth for the Labor Market entrepreneurship training for Selection youth MSDSPKG-LFYCSP- Consultant MEDIAPLAN-TR CQ 07-2021 / Component 1: Preparing TF / A8254 Post Qualification Open - National 15,000.00 16,832.53 Signed 2021-02-28 2021-03-01 2021-03-21 2021-05-04 2021-04-21 2021-06-03 2021-05-15 2021-07-08 2021-05-31 2022-01-04 Outreach and media coverage Youth for the Labor Market Selection of the L4Y project MSDSPKG-LFYCSP-TR-CQ 06- 2020 / Consultancy services on soft skills development Consultant training for teachers from Component 1: Preparing Under TF / A8254 Post Qualification Open - National 50,000.00 0.00 2021-02-28 2021-03-18 2021-03-21 2021-05-04 2021-06-03 2021-07-08 2022-01-04 selected TVET centers and Youth for the Labor Market Implementation Selection private educational institutions in Osh, Batken and Jalal -Abad oblast MSDSPKG-LFYCSP-TR-CQ 08- Component 3: Project Consultant 2020 / Consultant for Management and Pending TF / A8254 Post Qualification Open - National 7,000.00 0.00 2021-07-31 2021-08-21 2021-10-04 2021-11-03 2021-12-08 2022-06-06 Refresher training on VC Administration, M&E and Implementation Selection development for Facilitators Knowledge Dissemination IDA/LFYCSP/CS/TR/CQ/2021/ Component 2: Creating Consultant 09 / Training and mentoring Under TF / A8254 Market Opportunities for Post Qualification Open - National 88,800.00 0.00 2021-06-30 2021-05-28 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 for 30 common interest Implementation Youth Selection groups IDA/LFYCSP/CS/TR/CQ/2021/ 10 / Inter-district forums on Component 2: Creating Consultant Pending youth employment and skill TF / A8254 Market Opportunities for Post Qualification Open - National 10,670.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 Implementation development service Youth Selection provision. IDA/LFYCSP/CS/TR/CQ/2021/ Component 2: Creating Consultant 11 / District-level forum to Pending TF / A8254 Market Opportunities for Post Qualification Open - National 15,000.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 facilitate market linkages for Implementation Youth Selection common interest groups IDA/LFYCSP/CS/TR/CQ/2021/ Component 3: Project 12 / District-level learning Consultant Management and Pending forums,Oblast-level learning TF / A8254 Post Qualification Open - National 56,075.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 Administration, M&E and Implementation forums,End of project national Selection Knowledge Dissemination learning forum INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JSDF-LFYCSP-IC-12 VALUE Component 2: Creating Individual CHAIN SPECIALIST / Value TF / A8254 Market Opportunities for Post Consultant Open 41,706.00 20,921.76 Signed 2019-08-31 2019-08-23 2019-10-19 2019-10-22 2019-11-09 2019-10-22 2019-12-14 2019-11-11 2020-06-11 Chain Specialist Youth Selection Component 3: Project Individual JSDF-LFYCSP-CQ-17 / Management and TF / A8254 Prior Consultant Open 91,373.00 0.00 Canceled 2019-04-01 2019-07-29 2019-05-05 2019-05-15 2019-07-15 2022-07-15 Project Coordinator Administration, M&E and Selection Knowledge Dissemination JSDF-LFYCSP-IC-01 / Individual Component 1: Preparing Selection of Skills TF / A8254 Post Consultant Open 41,714.00 12,000.00 Completed 2019-09-30 2019-09-25 2019-11-18 2019-11-06 2019-12-09 2019-11-11 2020-01-13 2019-11-26 2020-07-11 2020-11-26 Youth for the Labor Market Development Officer Selection Individual JSDF-LFYCSP-IC-02 / Component 1: Preparing TF / A8254 Post Consultant Open 41,714.00 9,428.57 Terminated 2019-09-30 2019-09-25 2019-11-18 2019-11-06 2019-12-09 2019-11-11 2020-01-13 2019-11-26 2020-07-11 Selection of Placement Officer Youth for the Labor Market Selection Component 2: Creating Individual JSDF-LFYCSP-IC-05 / Youth TF / A8254 Market Opportunities for Post Consultant Open 41,706.00 16,832.55 Signed 2019-10-31 2019-09-25 2019-12-19 2019-11-06 2020-01-09 2019-11-11 2020-02-13 2019-11-26 2020-08-11 and Gender Officer Youth Selection MSDSP KG-JSDF-LFYCSP-IC- Component 2: Creating Individual 06 / Value Chain Facilitator #1 TF / A8254 Market Opportunities for Post Consultant Open 16,317.00 11,851.99 Signed 2019-11-30 2020-01-28 2020-01-18 2020-04-22 2020-02-08 2020-04-23 2020-03-14 2020-06-01 2020-09-10 for Osh oblast Youth Selection Page 2 MSDSP KG-JSDF-LFYCSP-IC- Component 2: Creating Individual 07 / Value Chain Facilitator #2 TF / A8254 Market Opportunities for Post Consultant Open 16,317.00 4,037.06 Terminated 2019-11-30 2020-01-28 2020-01-18 2020-04-22 2020-02-08 2020-04-23 2020-03-14 2020-05-21 2020-09-10 for Osh oblast Youth Selection MSDSP KG-JSDF-LFYCSP-IC- Component 2: Creating Individual 08 / Value Chain Facilitator #1 TF / A8254 Market Opportunities for Post Consultant Open 16,317.00 4,037.06 Completed 2019-11-30 2020-01-28 2020-01-18 2020-04-22 2020-02-08 2020-04-23 2020-03-14 2020-06-01 2020-09-10 2020-12-31 for Jalal-Abad oblast Youth Selection MSDSP KG-JSDF-LFYCSP-IC- Component 2: Creating Individual 09 / Value Chain Facilitator #2 TF / A8254 Market Opportunities for Post Consultant Open 16,317.00 10,882.16 Signed 2019-11-30 2020-01-28 2020-01-18 2020-04-22 2020-02-08 2020-04-23 2020-03-14 2020-06-01 2020-09-10 for Jalal-Abad oblast Youth Selection MSDSP KG-JSDF-LFYCSP-IC- Component 2: Creating Individual 10 / Value Chain Facilitator #1 TF / A8254 Market Opportunities for Post Consultant Open 16,318.00 10,882.16 Signed 2019-11-30 2020-01-28 2020-01-18 2020-04-22 2020-02-08 2020-04-23 2020-03-14 2020-06-01 2020-09-10 for Batken oblast Youth Selection MSDSP KG-JSDF-LFYCSP-IC- Component 2: Creating Individual 11 / Value Chain Facilitator #2 TF / A8254 Market Opportunities for Post Consultant Open 16,318.00 10,871.11 Signed 2019-11-30 2020-01-28 2020-01-18 2020-04-22 2020-02-08 2020-04-23 2020-03-14 2020-06-01 2020-09-10 for Batken oblast Youth Selection MSDSP KG-JSDF-LFYCSP-IC- Component 3: Project Individual 17 / Consultant for Management and Pending TF / A8254 Post Consultant Open 18,000.00 0.00 2021-10-31 2021-12-19 2022-01-09 2022-02-13 2022-08-12 Implementation completion Administration, M&E and Implementation Selection report Knowledge Dissemination Individual MSDSP KG-JSDF-LFYCSP-IC- Component 1: Preparing TF / A8254 Post Consultant Open 11,500.00 14,509.55 Signed 2020-02-29 2020-02-24 2020-04-18 2020-03-13 2020-05-09 2020-04-26 2020-06-13 2020-06-01 2020-12-10 18-2020 / Placement Officer Youth for the Labor Market Selection MSDSP KG\LFYCSP\OSH\IC- Component 2: Creating Individual 19\2020 / Value Chain TF / A8254 Market Opportunities for Post Consultant Open 16,317.00 630.11 Terminated 2020-05-31 2020-05-28 2020-07-19 2020-08-06 2020-08-09 2020-08-06 2020-09-13 2020-08-23 2021-03-12 Facilitator #2 for Osh oblast Youth Selection MSDSP KG-LFYCSP-VCF 2 IN Component 2: Creating Individual OSH-IND 21-2020 / Value TF / A8254 Market Opportunities for Post Consultant Open 16,317.00 6,453.92 Signed 2020-10-31 2020-09-28 2020-12-19 2020-12-09 2021-01-09 2020-12-11 2021-02-13 2021-01-04 2021-08-12 Chain Facilitator #2 for Osh Youth Selection oblast -Retender MSDSP KG-LFYCSP-TR-SSS 04-2020 / Development of beginner and advanced ICT Component 1: Preparing TF / A8254 Post Direct Selection Direct 40,820.00 40,421.97 Signed 2020-12-31 2021-01-15 2021-01-10 2021-01-24 2021-03-16 2021-02-02 2021-09-12 courses curricula in TVET Youth for the Labor Market Centers and Professional Lyceums MSDSPKG-LFYCSP-IC 20- Component 2: Creating Individual 2021 RETENDER / Value Chain TF / A8254 Market Opportunities for Post Consultant Open 12,500.00 5,077.57 Signed 2021-01-31 2021-01-15 2021-03-21 2021-02-26 2021-04-11 2021-02-26 2021-05-16 2021-03-15 2021-11-12 Facilitator #1 for Jalal-Abad Youth Selection oblast (Retender) MSDSPKG-LFYCSP-IC 22- Component 2: Creating Individual 2021 RETENDER / Value Chain TF / A8254 Market Opportunities for Post Consultant Open 12,500.00 0.00 Canceled 2021-01-31 2021-03-21 2021-04-11 2021-05-16 2021-11-12 Facilitator #1 for Batken Youth Selection oblast (Retender) MSDSPKG-LFYCSP-IC 22- Individual Component 1: Preparing 2021 / Skills Development TF / A8254 Post Consultant Open 31,650.00 5,641.74 Signed 2021-01-31 2021-01-15 2021-03-07 2021-02-26 2021-03-28 2021-02-26 2021-05-02 2021-03-15 2021-10-29 Youth for the Labor Market Officer (Retender) Selection Page 3 PROCUREMENT PLAN Project information: Belarus, Education Modernization Project, 8529-BY, 8943 - ВY Project Implementation agency: National Institute of Education Date of the Procurement Plan: January 2020 Period covered by this Procurement Plan: January 2020 – July 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods is not applicable Works is not applicable Other Relevant Procurement Information. Not Applicable PROCUREMENT Belarus : Belarus Education Modernization Project PLAN General Information Country: Belarus Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P148181 GPN Date: 2019-11-25 Project Name: Belarus Education Modernization Project Loan / Credit No: IBRD / 85290, IBRD / 89430 National Institute of Education Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Amount Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/NCB/1.1/2-16-2 / RECONSTRUCTION AND Ensuring a quality learning CAPITAL REPAIRS OF GENERAL environment in schools Single Stage - One 1,150,466.2 2016-07- 2016-08- IBRD / 85290 Prior Request for Bids Open - National Signed SECONDARY EDUCATION receiving students from Envelope 9 13 09 (GSE) FACILITIES IN VITEBSK closed/reorganized schools OBLAST 2016 BEMP/NCB/1.1/5-16/1 / RECONSTRUCTION AND Ensuring a quality learning CAPITAL REPAIRS OF GENERAL environment in schools Single Stage - One 2016-07- 2016-08- IBRD / 85290 Prior Request for Bids Open - National 211,298.16 Signed SECONDARY EDUCATION receiving students from Envelope 13 29 (GSE) FACILITIES IN MINSK closed/reorganized schools OBLAST 2016 BEMP/NCB/1.1/3-16-3 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2016-04- 2020-01- 2020-02- 2016-06- 2020-03- 2016-08- 2020-04- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 0.00 Canceled Envelope 04 29 09 20 06 21 03 25 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 BEMP/NCB/1.1/22/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-01- 2020-01- 2020-02- 2018-03- 2020-03- 2018-04- 2020-04- 2018-05- 2020-10- repairs of general secondary IBRD / 89430 management in general Post Request for Bids Open - National 414,066.16 Signed Envelope 04 19 09 20 06 21 04 25 03 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 (4 lot) BEMP/NCB/1.1/41 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-02- 2020-01- 2020-02- 2019-03- 2020-03- 2019-04- 2020-04- 2019-06- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 371,156.53 Signed Envelope 04 01 09 20 26 21 30 25 06 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 (2 lots) BEMP/NCB/1.1/41/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-07- 2020-01- 2020-02- 2019-08- 2020-03- 2019-10- 2020-04- 2019-11- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 161,491.47 Signed Envelope 04 17 09 20 30 21 10 25 18 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 (3 lots) BEMP/NCB/1.1/20/3 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-12- 2020-01- 2020-02- 2019-01- 2020-03- 2019-02- 2020-04- 2019-03- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 92,213.54 Signed Envelope 08 22 13 24 23 25 06 29 06 26 education (GSE) facilities in secondary education Brest Oblast – 2017 (2 lots) BEMP/NCB/1.1/25 / Reconstruction and capital Modernization of system Single Stage - One 1,041,029.9 2020-01- 2018-06- 2020-01- 2020-02- 2018-08- 2020-03- 2018-10- 2020-04- 2018-12- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National Signed Envelope 0 08 21 13 24 28 25 18 29 29 26 education (GSE) facilities in secondary education Mogilev Oblast – 2017 (1 lots) BEMP/NCB/1.1/25/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-12- 2020-01- 2020-02- 2019-02- 2020-03- 2019-05- 2020-04- 2019-06- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 945,069.39 Signed Envelope 08 03 13 24 20 25 13 29 13 26 education (GSE) facilities in secondary education Mogilev Oblast – 2017 (2 lots) BEMP/NCB/1.1/25/2 / Reconstruction and capital Modernization of system Single Stage - One 1,672,651.4 2020-01- 2019-03- 2020-01- 2020-02- 2019-04- 2020-03- 2019-06- 2020-04- 2019-08- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National Signed Envelope 3 08 04 13 24 10 25 28 29 21 26 education (GSE) facilities in secondary education Mogilev Oblast – 2017 (2 lots) BEMP/NCB/1.1/42 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-04- 2020-01- 2020-02- 2019-05- 2020-03- 2019-07- 2020-04- 2019-08- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 318,725.48 Signed Envelope 08 10 13 24 22 25 08 29 07 26 education (GSE) facilities in secondary education Minsk Oblast – 2018 (1 lot) BEMP/NCB/1.1/23 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2017-04- 2020-01- 2020-02- 2017-05- 2020-03- 2017-06- 2020-04- 2017-06- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 470,197.00 Signed Envelope 08 13 13 24 12 25 08 29 16 26 education (GSE) facilities in secondary education Grodno Oblast – 2017 (1 lot) BEMP/NCB/1.1/23/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-06- 2020-01- 2020-02- 2018-07- 2020-03- 2018-08- 2020-04- 2018-09- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 799,159.39 Signed Envelope 09 28 14 25 18 26 22 30 20 27 education (GSE) facilities in secondary education Grodno Oblast – 2017 (2 lots) BEMP/NCB/1.1/23/3 / Reconstruction and capital Modernization of system Single Stage - One 1,690,540.4 2020-01- 2018-12- 2020-01- 2020-02- 2019-01- 2020-03- 2019-03- 2020-04- 2019-04- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National Signed Envelope 3 09 14 14 25 17 26 26 30 26 27 education (GSE) facilities in secondary education Grodno Oblast – 2017 (1 lot) BEMP/NCB/1.1/23/2 / Reconstruction and capital Modernization of system Single Stage - One 2,134,116.3 2020-01- 2018-10- 2020-01- 2020-02- 2018-11- 2020-03- 2018-11- 2020-04- 2018-12- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National Signed Envelope 5 09 09 14 25 13 26 16 30 19 27 education (GSE) facilities in secondary education Grodno Oblast – 2017 (1 lot) BEMP/NCB/1.1/21/2 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-06- 2020-01- 2020-02- 2019-08- 2020-03- 2019-12- 2020-04- 2020-01- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 531,497.59 Signed Envelope 09 26 14 25 13 26 09 30 15 27 education (GSE) facilities in secondary education Vitebsk Oblast – 2017 (1 lot) BEMP/NCB/1.1/5 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2016-04- 2020-01- 2020-02- 2016-05- 2020-03- 2016-06- 2020-04- 2016-08- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 288,991.81 Signed Envelope 08 13 13 24 16 25 10 29 29 26 education (GSE) facilities in secondary education Minsk Oblast – 2016 (1 lot) BEMP/NCB/1.1/3-16-7 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2016-06- 2020-01- 2020-02- 2016-07- 2020-03- 2016-09- 2020-04- 2016-09- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 50,384.71 Signed Envelope 04 13 09 20 13 21 07 25 30 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 BEMP/NCB/1.1/41/2 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-09- 2020-02- 2020-03- 2019-10- 2020-04- 2020-02- 2020-05- 2020-03- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 380,739.86 Signed Envelope 28 13 02 15 14 14 05 19 27 15 education (GSE) facilities in secondary education Gomel Oblast – 2018 (2 lots) BEMP/NCB/1.1/41/1/1/1 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-01- 2019-10- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-04- 2020-11- IBRD / 85290 management in general Post Request for Bids Open - National 316,397.77 Signed education (GSE) facilities in Envelope 28 25 02 15 05 14 25 19 29 15 secondary education Gomel Oblast – 2018 (3 objects) BEMP/NCB/1.1/43 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-08- 2020-02- 2020-03- 2019-09- 2020-04- 2019-12- 2020-05- 2020-01- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 541,906.31 Signed Envelope 28 19 02 15 23 14 23 19 27 15 education (GSE) facilities in secondary education Mogilev Oblast – 2018 (3 lots) Page 1 BEMP/NCB/1.1/43/3 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-10- 2020-02- 2020-03- 2019-11- 2020-04- 2019-12- 2020-05- 2020-01- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 542,355.99 Signed Envelope 28 04 02 15 11 14 24 19 30 15 education (GSE) facilities in secondary education Mogilev Oblast – 2018 (2 lots) BEMP/NCB/1.1/43/2 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-01- 2019-09- 2020-02- 2020-03- 2020-02- 2020-04- 2020-02- 2020-05- 2020-11- IBRD / 85290 management in general Post Request for Bids Open - National 0.00 Canceled education (GSE) facilities in Envelope 28 16 02 15 14 14 17 19 15 secondary education Mogilev Oblast – 2018 (Slavgorod) BEMP/NCB/1.1/43/4 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-01- 2019-12- 2020-02- 2020-03- 2020-01- 2020-04- 2020-03- 2020-05- 2020-04- 2020-11- IBRD / 85290 management in general Post Request for Bids Open - National 913,262.24 Signed education (GSE) facilities in Envelope 28 24 02 15 24 14 10 19 17 15 secondary education Mogilev Oblast – 2018 (Myshkovichi) BEMP/NCB/1.1/43/5 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-01- 2019-12- 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-11- IBRD / 85290 management in general Post Request for Bids Open - National 0.00 Canceled education (GSE) facilities in Envelope 28 27 02 15 17 14 08 19 15 secondary education Mogilev Oblast – 2018 (Vyazie) BEMP/NCB/1.1/39 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-08- 2020-02- 2020-03- 2019-10- 2020-04- 2020-01- 2020-05- 2020-02- 2020-11- 2020- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 411,241.39 Completed Envelope 28 23 02 15 29 14 14 19 07 15 10-27 education (GSE) facilities in secondary education Brest Oblast – 2018 BEMP/NCB/1.1/39/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-10- 2020-02- 2020-03- 2019-11- 2020-04- 2020-01- 2020-05- 2020-03- 2020-11- 2020- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 427,927.91 Signed Envelope 28 08 02 15 20 14 14 19 12 15 12-30 education (GSE) facilities in secondary education Brest Oblast – 2018 (Lots 2) BEMP/NCB/1.1/20/3-1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-12- 2020-02- 2020-03- 2019-01- 2020-04- 2019-02- 2020-05- 2019-02- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 711,949.93 Signed Envelope 29 22 03 16 23 15 06 20 28 16 education (GSE) facilities in secondary education Brest Oblast - 2017 BEMP/NCB/1.1/3-16 -3 / Reconstruction and capital Modernization of system Single Stage - One 2020-02- 2016-05- 2020-02- 2020-03- 2016-05- 2020-04- 2016-07- 2020-05- 2016-08- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 470,662.99 Signed Envelope 06 04 11 24 25 23 05 28 08 24 education (GSE) facilities in secondary education Gomel Oblast – 2016 (1 lot) BEMP/NCB/1.1/21/3 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-01- 2019-10- 2020-01- 2020-02- 2019-11- 2020-03- 2020-02- 2020-04- 2020-05- 2020-10- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 566,625.85 Signed receiving students from Envelope 09 17 14 25 19 26 24 30 14 27 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast – 2017 (1 lot) BEMP/AF/1.1/4 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 1,220,843.8 2020-05- 2020-05- 2020-06- 2020-07- 2020-06- 2020-08- 2020-07- 2020-09- 2020-09- 2021-03- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 4 27 15 01 13 26 12 28 16 07 15 education facilities in Grodno closed/reorganized schools Oblast - 2020 BEMP/NCB/1.1/56 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-03- 2020-03- 2020-03- 2020-05- 2020-04- 2020-05- 2020-05- 2020-07- 2020-05- 2021-01- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 315,575.96 Signed receiving students from Envelope 15 05 20 01 07 31 06 05 22 01 education (GSE) facilities in closed/reorganized schools Gomel Oblast BEMP/NCB/1.1/42/3 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-03- 2020-03- 2020-03- 2020-05- 2020-04- 2020-05- 2020-06- 2020-07- 2021-01- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 15 03 20 01 21 31 19 05 01 education (GSE) facilities in closed/reorganized schools Minsk Oblast – 2018 (2 lots) BEMP/NCB/1.1/40 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-07- 2020-08- 2020-09- 2020-10- 2020-11- 2021-05- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 31 05 16 16 20 19 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast – 2018 (2 Lots) BEMP/AF/3/52 / Maintenance of the premises Project implementation Request for Single Stage - One 2020-05- 2020-07- 2021-01- IBRD / 89430 Post Open - National 0.00 Canceled at the address: 12 Makaenka support Quotations Envelope 25 20 16 Str., Minsk 220114; BEMP/NCB/1.1/57 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 2020-04- 2020-03- 2020-04- 2020-05- 2020-05- 2020-06- 2020-05- 2020-07- 2020-06- 2020-10- IBRD / 85290 Post Request for Bids Open - National 146,591.98 Signed education (GSE) facilities in receiving students from Envelope 20 17 20 06 06 05 14 17 22 15 Mogilev Oblast – 2018 closed/reorganized schools (Slavgorod) BEMP/NCB/1.1/60 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-04- 2020-04- 2020-04- 2020-05- 2020-05- 2020-07- 2020-06- 2020-09- 2020-07- 2021-03- IBRD / 85290 management in general Post Request for Bids Open - National 539,636.09 Signed education (GSE) facilities in Envelope 23 20 23 20 26 20 12 02 10 01 secondary education Mogilev Oblast – 2018 (Vyazie) BEMP/NCB/1.1/59 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-04- 2020-04- 2020-05- 2020-06- 2020-06- 2020-09- 2020-06- 2020-10- 2020-07- 2021-04- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 927,951.58 Signed receiving students from Envelope 30 29 07 18 01 16 23 28 20 26 education (GSE) facilities in closed/reorganized schools Gomel Oblast – 2019 (6 lots) BEMP/NCB/1.1/61 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-04- 2020-05- 2020-05- 2020-06- 2020-06- 2020-09- 2020-06- 2020-11- 2020-07- 2021-05- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 579,096.20 Signed receiving students from Envelope 30 06 14 25 08 23 19 04 08 03 education (GSE) facilities in closed/reorganized schools Minsk Oblast – 2020 (2 lots) BEMP/NCB/1.1/58 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-05- 2020-05- 2020-05- 2020-06- 2020-06- 2020-09- 2020-06- 2020-11- 2021-02- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 04 06 18 29 08 27 18 08 06 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast – 2018 (3 lots) BEMP/NCB/1.1/62 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 2020-05- 2020-05- 2020-05- 2020-07- 2020-06- 2020-10- 2020-07- 2020-11- 2020-07- 2021-05- IBRD / 85290 Post Request for Bids Open - National 270,461.25 Signed education (GSE) facilities in receiving students from Envelope 17 15 31 12 15 10 10 21 31 20 Mogilev Oblast – 2019 closed/reorganized schools (Batsevichi) BEMP/NCB/1.1/65 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-05- 2020-05- 2020-05- 2020-07- 2020-06- 2020-08- 2020-07- 2020-09- 2020-07- 2021-03- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 306,870.07 Signed receiving students from Envelope 22 22 27 08 22 07 09 11 23 10 education (GSE) facilities in closed/reorganized schools Grodno Oblast (Vertilishki) BEMP/AF/1.1/2 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2,116,303.4 2020-04- 2020-05- 2020-05- 2020-06- 2020-07- 2020-09- 2020-07- 2020-10- 2020-08- 2021-04- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 9 30 22 05 22 06 02 22 07 27 05 education facilities in Vitebsk closed/reorganized schools Oblast - 2020 BEMP/NCB/1.1/66 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- 2021-03- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 201,112.27 Signed receiving students from Envelope 09 09 14 26 09 25 03 29 03 28 education (GSE) facilities in closed/reorganized schools Gomel Oblast – 2020 BEMP/NCB/1.1/58/1 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2020-09- 2020-09- 2021-03- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 544,966.36 Signed receiving students from Envelope 19 19 24 20 20 29 31 02 20 01 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast – 2018 (3 lots) Page 2 BEMP/NCB/1.1/67 / Capital Ensuring a quality learning repair in the SEI "Perekolskaya environment in schools Single Stage - One 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- 2020-11- 2020-09- 2021-05- secondary school" in the IBRD / 85290 Post Request for Bids Open - National 299,114.48 Signed receiving students from Envelope 15 07 20 31 26 30 08 04 28 03 village of Percoll Klichev closed/reorganized schools district BEMP/AF/1.1/7 / Capital Ensuring a quality learning repair and modernization of environment in schools Single Stage - One 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2021-04- the secondary school No. 1 in IBRD / 89430 Post Request for Bids Open - National 413,461.55 Signed receiving students from Envelope 10 02 15 26 03 25 07 30 11 28 Klimovichi, 3 Starovoitova str. closed/reorganized schools (first starting complex) BEMP/AF/1.1/1 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-07- 2020-09- 2020-10- 2020-09- 2020-11- 2020-10- 2020-12- 2020-11- 2021-06- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 287,132.16 Signed receiving students from Envelope 27 29 01 13 09 12 01 17 09 15 education facilities in Brest closed/reorganized schools Oblast - 2020 BEMP/AF/1.1/3 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-07- 2020-07- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2020-11- 2020-10- 2021-05- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 400,159.72 Signed receiving students from Envelope 31 21 05 16 20 16 03 20 09 19 education facilities in Gomel closed/reorganized schools Oblast - 2020 BEMP/AF/1.1/6 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2021-04- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 25 30 11 10 15 13 education facilities in Mogilev closed/reorganized schools Oblast - 2020 BEMP/AF/1.1/13 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-07- 2020-07- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2020-11- 2020-09- 2021-05- 2021- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 529,363.70 Completed receiving students from Envelope 31 23 05 16 24 16 02 20 25 19 01-29 education facilities in Vitebsk closed/reorganized schools Oblast BEMP/AF/1.1/14 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-07- 2020-07- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2020-11- 2020-10- 2021-05- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 361,761.68 Signed receiving students from Envelope 31 22 05 16 21 16 02 20 20 19 education facilities in Grodno closed/reorganized schools Oblast BEMP/3/52 / Maintenance of the premises at the address: Project implementation Request for Single Stage - One 2020-08- 2020-09- 2020-09- 2021-03- 2020- IBRD / 85290 Post Open - National 9,185.00 Completed 12 Makaenka Str., Minsk support Quotations Envelope 04 29 22 28 12-01 220114; BEMP/NCB/1.1/42/4 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-07- 2020-08- 2020-10- 2020-09- 2021-01- 2020-09- 2021-02- 2020-10- 2021-08- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 434,476.56 Signed receiving students from Envelope 03 29 17 16 04 14 15 25 12 24 education (GSE) facilities in closed/reorganized schools Minsk Oblast – 2019 (2 lots) BEMP/NCB/1.1/68 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-07- 2020-08- 2020-10- 2020-08- 2021-01- 2020-08- 2021-02- 2020-10- 2021-08- 2021- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 304,049.78 Signed receiving students from Envelope 03 27 17 16 25 14 25 25 12 24 05-12 education (GSE) facilities in closed/reorganized schools Brest Oblast – 2019 (2 lots) BEMP/NCB/1.1/69 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-08- 2020-10- 2020-12- 2020-10- 2021-03- 2020-11- 2021-04- 2020-12- 2021-10- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 240,409.20 Signed receiving students from Envelope 07 06 06 05 01 05 12 16 17 13 education (GSE) facilities in closed/reorganized schools Brest Oblast – 2019 BEMP/AF/1.1/15 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-08- 2020-09- 2020-11- 2020-09- 2021-02- 2020-09- 2021-03- 2020-10- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 699,817.75 Signed receiving students from Envelope 28 06 11 10 04 08 15 22 20 18 education facilities in Vitebsk closed/reorganized schools Oblast (2 lots) BEMP/AF/1.1/16 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 1,045,426.9 2020-08- 2020-08- 2020-09- 2020-11- 2020-09- 2021-02- 2020-10- 2021-03- 2020-11- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 8 28 28 11 10 28 08 07 22 18 18 education facilities in Vitebsk closed/reorganized schools Oblast (3 lots) BEMP/AF/1.1/8 / "Capital repair with elements of Ensuring a quality learning modernization and environment in schools Single Stage - One 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-11- 2021-05- IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled rehabilitation of the receiving students from Envelope 13 08 18 29 10 28 28 02 01 secondary school No. 1 in closed/reorganized schools Postavu" (first starting complex) BEMP/AF/4/1.1/17 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-09- 2020-09- 2020-10- 2020-12- 2020-10- 2021-03- 2020-10- 2021-05- 2020-11- 2021-06- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 38,223.91 Signed receiving students from Envelope 30 10 28 27 09 27 20 08 26 07 education facility in Grodno closed/reorganized schools Oblast (Mosty) BEMP/AF/2/1.1/18 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 1,320,516.3 2020-09- 2020-09- 2020-10- 2020-12- 2020-10- 2021-03- 2020-11- 2021-05- 2021-02- 2021-08- IBRD / 89430 Post Request for Bids Open - National Signed education facilities in Vitebsk receiving students from Envelope 7 30 22 28 27 30 27 24 08 08 06 Oblast (Babinichi, Bolbasovo, closed/reorganized schools Sharkovschina, Glubokoe) BEMP/NCB/1.1/70 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 2020-10- 2020-10- 2020-11- 2021-01- 2020-11- 2021-02- 2020-11- 2021-03- 2020-12- 2021-05- IBRD / 85290 Post Request for Bids Open - National 80,879.63 Signed education facilities in Brest receiving students from Envelope 09 05 06 05 05 04 18 18 10 17 Oblast 2019 (Lipniki, closed/reorganized schools Lubachin) BEMP/NCB/1.1/72 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-09- 2020-09- 2020-10- 2020-12- 2020-10- 2021-03- 2020-11- 2021-05- 2020-12- 2021-08- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 303,401.68 Signed receiving students from Envelope 30 29 28 27 29 27 10 08 04 21 education facility in Mogilev closed/reorganized schools Oblast 2020 (Lopatichi) BEMP/NCB/1.1/71 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-10- 2020-10- 2020-11- 2021-01- 2020-11- 2021-04- 2020-12- 2021-05- 2021-01- 2021-06- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 663,095.99 Signed receiving students from Envelope 15 20 12 11 19 11 17 23 18 01 education facilities in Gomel closed/reorganized schools Oblast 2020 (3 lots) BEMP/AF/2/1.1/19 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 1,103,664.1 2020-11- 2020-10- 2020-12- 2021-02- 2020-11- 2021-05- 2020-12- 2021-06- 2021-01- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 1 05 23 03 01 20 02 11 13 28 11 education facility in Vitebsk closed/reorganized schools Oblast (Gorodok, Braslav) BEMP/AF/1/1.1/20 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-10- 2020-12- 2021-02- 2021-01- 2021-05- 2021-01- 2021-06- 2021-02- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 141,388.00 Signed receiving students from Envelope 05 29 03 01 12 02 20 13 10 11 education facility in Brest closed/reorganized schools Oblast (Cherni) BEMP/AF/2/1.1/21 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-05- 2020-12- 2021-06- 2021-02- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 400,453.84 Signed receiving students from Envelope 05 04 03 01 14 02 21 13 05 11 education facility in Vitebsk closed/reorganized schools Oblast (Polotsk, Oktiabrskii) BEMP/AF/6/1.1/22 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-10- 2020-11- 2020-12- 2020-12- 2021-01- 2020-12- 2021-02- 2021-02- 2021-08- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 711,548.08 Signed receiving students from Envelope 05 29 10 22 01 21 22 25 04 24 education facility in Mogilev closed/reorganized schools Oblast BEMP/NCB/1.1/75 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-05- 2020-12- 2021-06- 2021-02- 2021-09- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 576,227.73 Signed receiving students from Envelope 27 09 11 09 09 10 29 21 05 19 education facility in Mogilev closed/reorganized schools Oblast 2020 (Slavgorod) Page 3 BEMP/NCB/1.1/78 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-05- 2021-01- 2021-06- 2021-01- 2021-09- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 234,332.48 Signed receiving students from Envelope 27 24 11 09 28 10 14 21 28 19 education facilities in Grodno closed/reorganized schools Oblast 2020 (Smorgon) BEMP/NCB/1.1/79 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-05- 2021-01- 2021-06- 2021-02- 2021-09- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 244,231.76 Signed receiving students from Envelope 27 30 11 09 29 10 22 21 05 19 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast BEMP/NCB/1.1/80 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-12- 2020-12- 2021-01- 2021-03- 2021-01- 2021-06- 2021-02- 2021-07- 2021-03- 2021-10- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 471,734.85 Signed receiving students from Envelope 30 21 13 14 28 12 10 24 11 22 education (GSE) facilities in closed/reorganized schools Brest Oblast BEMP/AF/2/1.1/23 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-12- 2020-12- 2021-01- 2021-03- 2021-06- 2021-07- 2021-10- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 23 23 06 07 05 17 05 education facility in Vitebsk closed/reorganized schools Oblast (Polotsk) BEMP/3/52-1 / Maintenance of the premises at the Project implementation Request for Single Stage - One 2021-02- 2021-02- 2021-04- 2021-03- 2021-10- IBRD / 85290 Post Open - National 32,215.24 Signed address: 12 Makaenka Str., support Quotations Envelope 11 16 22 24 19 Minsk 220114; BEMP/AF/3/1.1/24 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-01- 2021-01- 2021-02- 2021-04- 2021-02- 2021-07- 2021-03- 2021-08- 2021-04- 2022-03- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 483,956.80 Signed receiving students from Envelope 20 18 03 04 19 03 04 14 02 12 education facilities in Gomel closed/reorganized schools Oblast (Glazovka) BEMP/AF/2/1.1/25 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-01- 2021-02- 2021-04- 2021-03- 2021-07- 2021-03- 2021-08- 2021-04- 2021-12- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 479,080.20 Signed receiving students from Envelope 02 26 16 17 02 16 19 27 27 25 education facilities in Vitebsk closed/reorganized schools Oblast (Beshenkovichi) BEMP/AF/5/1.1/27 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-03- 2021-09- 2021-04- 2022-01- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 277,272.69 Signed receiving students from Envelope 10 03 03 17 03 16 17 10 08 08 education facility in Minsk closed/reorganized schools Oblast (Pogost) BEMP/AF/3/1.1/26 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-04- 2021-09- 2021-05- 2021-12- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 390,738.15 Signed receiving students from Envelope 12 05 05 19 09 18 01 12 05 21 education facilities in Gomel closed/reorganized schools Oblast (Svetilovichi) BEMP/AF/2/1.1/29 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-03- 2021-09- 2021-04- 2021-12- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 646,657.65 Signed receiving students from Envelope 10 05 03 17 10 16 19 10 12 09 education facilities in Vitebsk closed/reorganized schools Oblast (Polotsk) BEMP/NCB/1.1/82 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-05- 2021-03- 2021-08- 2021-04- 2021-09- 2022-04- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 15 19 08 07 22 05 06 30 28 education facility in Brest closed/reorganized schools Oblast (Nacha, Perkovichi) BEMP/AF/4/1.1/28 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-04- 2021-09- 2021-04- 2021-11- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 120,714.90 Signed receiving students from Envelope 23 17 16 30 17 29 02 23 26 22 education facility in Grodno closed/reorganized schools Oblast (Smorgon 1) BEMP/AF/2/1.1/30 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 1,037,495.9 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-04- 2021-09- 2021-05- 2022-01- IBRD / 89430 Post Request for Bids Open - National Signed education facility in Vitebsk receiving students from Envelope 1 23 19 16 30 23 29 20 23 24 21 Oblast (Glubokoe, Ushachi, closed/reorganized schools Borovka, Zaslonovo) BEMP/AF/5/1.1/33 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-03- 2021-03- 2021-03- 2021-04- 2021-03- 2021-07- 2021-04- 2021-08- 2021-05- 2021-11- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 226,615.12 Signed receiving students from Envelope 10 02 31 04 17 03 19 28 24 06 education facilities in Minsk closed/reorganized schools Oblast (Bokshitsy) BEMP/AF/4/1.1/31 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-05- 2021-04- 2021-06- 2021-12- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 09 04 14 25 05 25 29 29 26 education facilities in Grodno closed/reorganized schools Oblast (Gozha) BEMP/AF/2/1.1/32 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 1,224,448.4 2021-03- 2021-03- 2021-04- 2021-06- 2021-04- 2021-09- 2021-05- 2021-10- 2021-06- 2022-02- education facilities in Vitebsk IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 4 31 24 21 05 19 03 05 29 17 26 Oblast (Dubrovno, closed/reorganized schools Novolukoml, Liozno, Babinichi) BEMP/AF/6/1.1/34 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-04- 2021-04- 2021-05- 2021-06- 2021-05- 2021-09- 2021-05- 2021-11- 2022-03- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 14 02 05 19 04 17 19 12 12 education facilities in Mogilev closed/reorganized schools Oblast (Klimovichi 4) BEMP/NCB/1.1/84 / Ensuring a quality learning Reconstruction and capital Under environment in schools Single Stage - One 2021-04- 2021-03- 2021-05- 2021-06- 2021-04- 2021-09- 2021-06- 2021-11- 2022-01- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 319,501.14 Implementa receiving students from Envelope 14 30 05 19 30 17 08 12 01 education facilities in Mogilev tion closed/reorganized schools Oblast (Klimovichi 1) BEMP/NCB/1.1/85 / Ensuring a quality learning Reconstruction and capital Under environment in schools Single Stage - One 2021-04- 2021-04- 2021-05- 2021-07- 2021-05- 2021-10- 2021-11- 2022-01- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Implementa receiving students from Envelope 30 21 21 05 21 03 28 17 education facility in Vitebsk tion closed/reorganized schools Oblast (Ostrovno) BEMP/NCB/1.1/86 / Ensuring a quality learning Reconstruction and capital Under environment in schools Single Stage - One 2021-04- 2021-04- 2021-05- 2021-06- 2021-05- 2021-09- 2021-06- 2021-11- 2022-02- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Implementa receiving students from Envelope 23 22 14 28 24 26 15 21 19 education facilities in Grodno tion closed/reorganized schools Oblast (Ostroves) BEMP/NCB/1.1/87 / Reconstruction and capital Request for Ensuring a quality learning repairs of general secondary Bids - Small Under environment in schools Single Stage - One 2021-04- 2021-04- 2021-05- 2021-07- 2021-05- 2021-10- 2021-11- 2022-05- education facility in Brest IBRD / 85290 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 30 29 21 05 31 03 28 27 Oblast (Nacha, Bostun, envelope tion closed/reorganized schools Mikashevichi,Perkovichi, process) Kroshin, Mir) BEMP/AF/4/1.1/38 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-06- 2021-07- 2021-06- 2021-10- 2021-12- 2022-04- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 12 05 02 17 07 15 10 19 education facilities in Gomel envelope tion closed/reorganized schools Oblast (Novogrudok) process) BEMP/AF/2/1.1/35 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-03- 2021-05- 2021-07- 2021-04- 2021-10- 2021-05- 2021-12- 2022-03- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 07 30 28 12 30 10 19 05 15 education facility in Vitebsk envelope tion closed/reorganized schools Oblast (Rossony) process) BEMP/AF/2/1.1/36 / Request for Reconstruction and capital Ensuring a quality learning Bids - Small Under repairs of general secondary environment in schools Single Stage - One 2021-05- 2021-04- 2021-05- 2021-07- 2021-05- 2021-10- 2021-12- 2022-03- IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa education facility in Vitebsk receiving students from Envelope 07 25 28 12 28 10 05 25 envelope tion Oblast (Glubokoe, Ushachi, closed/reorganized schools process) Bigosovo) Page 4 BEMP/AF/4/1.1/37 / Request for Reconstruction and capital Ensuring a quality learning Bids - Small Under repairs of general secondary environment in schools Single Stage - One 2021-05- 2021-04- 2021-05- 2021-07- 2021-05- 2021-10- 2021-06- 2021-12- 2022-05- IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa education facility in Grodno receiving students from Envelope 07 26 28 12 27 10 11 05 14 envelope tion Oblast (Diatlovo, Zheludok, closed/reorganized schools process) Porozovo) BEMP/NCB/1.1/89 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-06- 2021-07- 2021-06- 2021-10- 2021-12- 2022-06- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 14 07 04 19 08 17 12 10 education facility in Brest envelope tion closed/reorganized schools Oblast (Kossovo) process) BEMP/AF/4/1.1/39 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-06- 2021-08- 2022-02- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 07 05 12 23 25 23 08 27 23 education facility in Grodno envelope tion closed/reorganized schools Oblast (Gozha) process) BEMP/AF/3/1.1/41 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-06- 2021-07- 2021-06- 2021-10- 2021-12- 2022-06- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 21 21 11 26 18 24 19 17 education facility in Gomel envelope tion closed/reorganized schools Oblast (Rovkovichi) process) BEMP/AF/6/1.1/40 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-06- 2021-08- 2021-10- 2021-12- 2022-04- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 27 27 17 01 30 25 24 education facilities in Mogilev envelope tion closed/reorganized schools Oblast (Klimovichi 4) process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/ICB/1.2/1/1 / Supply of educational equipment for Computer Science Ensuring a quality learning classrooms, including environment in schools Open - Single Stage - One 2018-07- 2018-08- installation and setup, in IBRD / 85290 Prior Request for Bids 855,630.00 Signed receiving students from International Envelope 09 15 Grodno Oblast, Mogilev closed/reorganized schools Oblast, Vitebsk Oblast, Minsk Oblast, Brest Oblast and Gomel Oblast (22 classrooms) BEMP/ICB/1.2/1 / Supply of equipment for subject Modernization of system laboratories Physics, Open - Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-10- IBRD / 85290 management in general Prior Request for Bids 0.00 Canceled Chemistry, Biology and International Envelope 08 13 24 25 29 26 secondary education Computer Science (installation and setup) 2016 BEMP/ICB/1.2/4 / Supply of Modernization of system equipment for subject Open - Single Stage - One 2020-01- 2018-12- 2020-01- 2020-02- 2019-02- 2020-03- 2019-06- 2020-04- 2019-08- 2020-10- IBRD / 85290 management in general Post Request for Bids 698,567.68 Signed laboratories Biology International Envelope 08 27 13 24 15 25 10 29 16 26 secondary education (installation and setup) 2016 BEMP/ICB/1.2/2 / Supply of educational equipment for Physics, Chemistry, Biology Modernization of system Open - Single Stage - One 2020-01- 2020-01- 2020-01- 2020-02- 2019-12- 2020-03- 2020-04- 2020-04- 2020-06- 2020-10- and Computer Science IBRD / 85290 management in general Prior Request for Bids 1,304,928.00 Signed International Envelope 08 28 13 24 12 25 29 29 19 26 classrooms, including secondary education installation and setup, second stage BEMP/AF/2.2/6 / Purchase of Modernization of system Request for Single Stage - One 2020-01- 2020-01- 2020-03- 2020-01- 2020-09- 2020-03- consumables for the National IBRD / 89430 management in general Post Limited 1,851.18 Completed Quotations Envelope 20 20 16 27 12 02 Center secondary education BEMP/ICB/1.2/3 / Supply of educational equipment for Ensuring a quality learning Physics, Chemistry, Biology environment in schools Open - Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-10- and Computer Science IBRD / 85290 Prior Request for Bids 0.00 Canceled receiving students from International Envelope 08 13 24 25 29 26 classrooms, including closed/reorganized schools installation and setup, third stage BEMP/ICB/1.2/5 / Supply of educational equipment for Ensuring a quality learning Physics, Chemistry and environment in schools Open - Single Stage - One 2020-05- 2020-05- 2020-05- 2020-05- 2020-06- 2020-07- 2020-07- 2020-09- 2020-09- 2020-11- 2021-03- IBRD / 85290 Post Request for Bids 1,059,549.34 Signed Biology classrooms, including receiving students from International Envelope 18 22 18 22 29 24 29 22 02 16 01 installation and setup, third closed/reorganized schools stage BEMP/2.1/4 / Purchase of Modernization of system Request for Single Stage - One 2020-10- 2020-12- 2020-10- 2021-06- equipment and licensed IBRD / 85290 management in general Post Open - National 44,002.08 Signed Quotations Envelope 19 14 20 12 software secondary education BEMP/2.3/3 / provision of services for the creation of an Modernization of system information management Single Stage - One 2020-12- 2020-07- 2020-12- 2021-01- 2020-11- 2021-02- 2021-03- 2021-09- IBRD / 85290 management in general Post Request for Bids Open - National 0.00 Canceled system in the education Envelope 01 24 06 17 20 16 23 19 secondary education sector of the Republic of Belarus BEMP/AF/2.2/6-1 / Purchase Modernization of system Request for Single Stage - One 2021-01- 2021-04- 2021-01- 2021-05- 2021-03- of consumables for the IBRD / 89430 management in general Post Open - National 2,969.81 Completed Quotations Envelope 18 05 29 05 23 National Center secondary education BEMP/AF/RFB/1.2/1 / Supply Ensuring a quality learning of educational equipment for Under environment in schools 2021-02- 2021-04- 2021-03- 2021-04- 2021-05- 2021-06- 2021-09- 2021-10- 2022-04- Physics, Chemistry and IBRD / 89430 Prior Request for Bids 0.00 Implementati receiving students from 24 06 10 07 09 09 06 18 16 Biology classrooms, including on closed/reorganized schools installation and setup BEMP/AF/RFB/1.2/2 / Supply Ensuring a quality learning of furniture for Physics, Under environment in schools Single Stage - One 2021-03- 2021-03- 2021-04- 2021-06- 2021-05- 2021-09- 2021-10- 2022-04- Chemistry and Biology IBRD / 89430 Post Request for Bids Open - National 0.00 Implementati receiving students from Envelope 31 24 21 05 14 03 29 27 classrooms, including on closed/reorganized schools installation and setup NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/2.3/4 / provision of services for the creation of an Modernization of system information management Single Stage - One 2020-12- 2020-12- 2020-12- 2021-02- 2021-02- 2021-05- 2021-05- 2021-06- 2021-05- 2021-12- IBRD / 85290 management in general Post Request for Bids Open - National 984,000.00 Signed system in the education Envelope 14 11 28 11 24 12 13 23 31 20 secondary education sector of the Republic of Belarus CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/CQS/1.1/18-1 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools Open - 2016-11- 2016-11- reconstruction and capital IBRD / 85290 Prior Qualification 2,966.95 Signed receiving students from International 02 04 repairs of GSE facilities in Selection closed/reorganized schools Minsk Oblast 2016. Lyuban district. Page 5 BEMP/CQS/1.1/18-2 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools Open - 2016-11- 2016-11- reconstruction and capital IBRD / 85290 Prior Qualification 2,108.33 Signed receiving students from International 02 04 repairs of GSE facilities in Selection closed/reorganized schools Minsk Oblast 2016. Cherven district. BEMP/QCBS/1.1/9 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Open - 2017-05- 2017-05- IBRD / 85290 Prior 67,741.15 Signed reconstruction and capital receiving students from Based Selection International 15 23 repairs of GSE facilities in closed/reorganized schools Gomel Oblast 2017 BEMP/QCBS/1.1/46 / Development of construction Modernization of system design documentation for Quality And Cost- 2018-05- 2020-01- 2020-03- 2018-11- 2020-04- 2018-12- 2020-05- 2019-01- 2020-06- 2019-02- 2020-07- 2019-04- 2021-07- IBRD / 85290 management in general Post Open - National 51,180.87 Signed 2020-01-04 reconstruction and capital Based Selection 15 25 09 06 06 10 06 21 10 14 15 30 15 secondary education repairs of GSE facilities in Gomel Oblast – 2019 BEMP/QCBS/1.1/44 / Development of construction Modernization of system design documentation for Quality And Cost- 2018-06- 2020-01- 2020-03- 2018-11- 2020-04- 2018-12- 2020-05- 2019-03- 2020-06- 2019-03- 2020-07- 2019-04- 2021-07- IBRD / 85290 management in general Post Open - National 82,013.19 Signed 2020-01-08 reconstruction and capital Based Selection 01 29 13 06 10 17 10 01 14 05 19 30 19 secondary education repairs of GSE facilities in Brest Oblast – 2019 BEMP/QCBS/1.1/48 / Development of construction Modernization of system design documentation for Quality And Cost- 2018-03- 2020-01- 2020-03- 2018-12- 2020-04- 2019-01- 2020-05- 2019-03- 2020-06- 2019-03- 2020-07- 2019-06- 2021-07- IBRD / 85290 management in general Post Open - National 58,401.64 Signed 2020-01-08 reconstruction and capital Based Selection 27 29 13 12 10 11 10 20 14 28 19 13 19 secondary education repairs of GSE facilities in Mogilev Oblast – 2019 BEMP/QCDS/1.1/47 / Development of construction Modernization of system design documentation for Quality And Cost- 2018-03- 2020-01- 2020-03- 2018-12- 2020-04- 2019-01- 2020-05- 2019-03- 2020-06- 2019-03- 2020-07- 2019-07- 2021-07- IBRD / 85290 management in general Post Open - National 32,097.00 Signed 2020-01-08 reconstruction and capital Based Selection 28 29 13 12 10 11 10 20 14 28 19 08 19 secondary education repairs of GSE facilities in Minsk Oblast – 2019 BEMP/QCBS/1.1/27 / Development of construction Modernization of system design documentation for Quality And Cost- 2017-11- 2020-01- 2020-03- 2018-03- 2020-04- 2018-04- 2020-05- 2018-05- 2020-06- 2018-05- 2020-07- 2018-09- 2021-07- IBRD / 85290 management in general Post Open - National 36,860.00 Signed 2020-01-09 reconstruction and capital Based Selection 03 30 14 28 11 27 11 11 15 17 20 24 20 secondary education repairs of GSE facilities in Vitebsk Oblast – 2018 BEMP/CQS/1.1/24 / Development of construction Modernization of system Consultant design documentation for 2018-12- 2020-01- 2020-03- 2019-01- 2020-04- 2019-03- 2020-05- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 0.00 Canceled 2020-01-09 reconstruction and capital 17 30 14 28 13 20 18 14 secondary education Selection repairs of GSE facilities in Vitebsk Oblast BEMP/CQS/1.1/33/1 / Integrated management and Modernization of system Consultant technical supervision of the 2018-12- 2020-02- 2020-03- 2018-12- 2020-04- 2019-01- 2020-05- 2019-01- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 13,887.57 Signed 2020-01-15 reconstruction and capital 11 05 20 28 19 15 24 16 20 secondary education Selection repairs of GSE facilities in Brest Oblast – 2017 (3 objects) BEMP/CQS/1.1/52 / Integrated management and Modernization of system Consultant technical supervision of the 2019-05- 2020-02- 2020-03- 2019-07- 2020-04- 2019-08- 2020-05- 2020-10- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 11,468.02 Signed 2020-01-15 reconstruction and capital 07 05 20 17 19 15 24 06 20 secondary education Selection repairs of GSE facilities in Minsk Oblast – 2018 BEMP/CQS/1.1/51/1 / Integrated management and technical supervision of the Modernization of system Consultant 2019-07- 2020-02- 2020-03- 2019-10- 2020-04- 2019-10- 2020-05- 2020-05- 2020-11- reconstruction and capital IBRD / 85290 management in general Post Qualification Open - National 55,922.76 Signed 2020-01-15 07 05 20 02 19 29 24 18 20 repairs of GSE facilities in secondary education Selection Gomel Oblast – 2018 (7 objects) BEMP/CQS/1.1/33 / Integrated management and Modernization of system Consultant technical supervision of the 2018-06- 2020-02- 2020-03- 2018-09- 2020-04- 2018-10- 2020-05- 2018-10- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 14,728.39 Signed 2020-01-15 reconstruction and capital 13 05 20 14 19 03 24 12 20 secondary education Selection repairs of GSE facilities in Brest Oblast – 2017 (7 objects) BEMP/CQS/1.1/38/1 / Integrated management and Modernization of system Consultant technical supervision of the 2018-11- 2020-02- 2020-03- 2019-01- 2020-04- 2019-03- 2020-05- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 0.00 Canceled 2020-01-15 reconstruction and capital 13 05 20 28 19 21 24 20 secondary education Selection repairs of GSE facilities in Mogilev Oblast – 2017 BEMP/CQS/1.1/51 / Integrated management and Modernization of system Consultant technical supervision of the 2019-02- 2020-02- 2020-03- 2019-06- 2020-04- 2019-06- 2020-05- 2019-06- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 14,033.20 Signed 2020-01-15 reconstruction and capital 26 05 20 06 19 20 24 24 20 secondary education Selection repairs of GSE facilities in Gomel Oblast – 2018 BEMP/CQS/1.1/35 / Integrated management and Modernization of system Consultant technical supervision of the 2018-02- 2020-02- 2020-03- 2018-03- 2020-04- 2018-04- 2020-05- 2018-04- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 6,879.47 Signed 2020-01-15 reconstruction and capital 07 05 20 27 19 28 24 28 20 secondary education Selection repairs of GSE facilities in Gomel Oblast – 2017 BEMP/CQS/1.1/38 / Integrated management and Modernization of system Consultant technical supervision of the 2018-08- 2020-02- 2020-03- 2018-11- 2020-04- 2018-11- 2020-05- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 0.00 Canceled 2020-01-15 reconstruction and capital 08 05 20 06 19 22 24 20 secondary education Selection repairs of GSE facilities in Mogilev Oblast – 2017 BEMP/CQS/1.1/34 / Development of construction Modernization of system Consultant design documentation for 2018-10- 2020-02- 2020-04- 2019-01- 2020-05- 2019-03- 2020-06- 2019-05- 2020-12- IBRD / 85290 management in general Post Qualification Open - National 6,600.59 Signed 2020-01-29 reconstruction and capital 10 19 03 28 03 20 07 22 04 secondary education Selection repairs of GSE facilities in Vitebsk Oblast BEMP/LCS/3/49 / Financial Project implementation Least Cost 2020-02- 2020-03- 2020-04- 2020-02- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-04- 2020-08- 2020-04- 2021-02- audit of the project – 2019 IBRD / 85290 Post Open - National 3,854.92 Signed 2020-02-19 support Selection 17 11 24 25 22 20 21 31 26 06 30 10 26 (loan - 8529-BY) BEMP/CQS//1.1/38/1 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2018-11- 2020-03- 2020-04- 2019-01- 2020-05- 2019-03- 2020-06- 2019-08- 2020-12- IBRD / 85290 Post Qualification Open - National 22,598.01 Signed 2020-02-19 reconstruction and capital receiving students from 13 11 24 28 24 21 28 21 25 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast – 2017 BEMP/CQS//1.1/38 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2018-08- 2020-02- 2020-04- 2018-11- 2020-05- 2018-11- 2020-06- 2018-11- 2020-12- IBRD / 85290 Post Qualification Open - National 1,173.51 Signed 2020-02-04 reconstruction and capital receiving students from 03 25 09 06 09 22 13 23 10 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast – 2017 BEMP/CQS/1.1/49 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2019-08- 2020-02- 2020-04- 2020-01- 2020-05- 2020-01- 2020-06- 2020-03- 2020-12- IBRD / 85290 Post Qualification Open - National 22,804.19 Signed 2020-02-06 reconstruction and capital receiving students from 23 27 11 03 11 17 15 02 12 Selection repairs of GSE facilities in closed/reorganized schools Brest Oblast BEMP/CQS/1.1/53 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2019-08- 2020-02- 2020-04- 2019-11- 2020-05- 2019-12- 2020-06- 2020-02- 2020-12- IBRD / 85290 Post Qualification Open - National 28,782.36 Signed 2020-02-06 reconstruction and capital receiving students from 14 27 11 05 11 30 15 12 12 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast Page 6 BEMP/CQS/1.1/53/1 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2019-09- 2020-02- 2020-04- 2020-05- 2020-05- 2020-06- 2020-06- 2020-06- 2020-12- IBRD / 85290 Post Qualification Open - National 13,381.25 Signed 2020-02-06 reconstruction and capital receiving students from 27 27 11 22 11 12 15 22 12 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast BEMP/QCBS/1.1/55 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2019-05- 2020-02- 2020-04- 2019-09- 2020-05- 2019-10- 2020-06- 2019-11- 2020-07- 2019-11- 2020-08- 2020-01- 2021-08- IBRD / 85290 Post Open - National 27,724.83 Signed 2020-02-06 reconstruction and capital receiving students from Based Selection 28 27 11 16 09 16 08 18 13 25 17 29 17 repairs of GSE facilities in closed/reorganized schools Gomel Oblast BEMP/QCBS/1.1/54 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2019-03- 2020-02- 2020-04- 2019-08- 2020-05- 2019-09- 2020-06- 2019-11- 2020-07- 2019-11- 2020-08- 2020-02- 2021-08- IBRD / 85290 Post Open - National 38,415.45 Signed 2020-02-07 reconstruction and capital receiving students from Based Selection 05 28 12 22 10 26 09 11 14 25 18 26 18 repairs of GSE facilities in closed/reorganized schools Brest Oblast BEMP/CQS/1.1/34/1 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2019-10- 2020-02- 2020-04- 2020-03- 2020-05- 2020-04- 2020-06- 2020-05- 2020-12- IBRD / 85290 Post Qualification Open - National 6,155.47 Signed 2020-02-06 reconstruction and capital receiving students from 17 27 11 13 11 08 15 06 12 Selection repairs of GSE facilities in closed/reorganized schools Vitebsk Oblast BEMP/AF/2.5/8-2 / Procurement of consulting Modernization of system Consultant 2020-04- 2020-06- 2020-07- 2020-09- 2020-08- 2020-09- 2020-10- 2021-01- 2021-04- 2021-06- services on improving the IBRD / 89430 management in general Post Qualification Open - National 1,119.75 Completed 2020-05-27 30 17 31 21 30 18 04 18 02 07 educational environment of secondary education Selection GSEI BEMP/AF/2.5/8-3 / Procurement of consulting Modernization of system Consultant services on the 2020-04- 2020-06- 2020-07- 2020-09- 2020-08- 2020-09- 2020-10- 2020-11- 2021-04- 2021-03- IBRD / 89430 management in general Post Qualification Open - National 1,342.73 Completed 2020-05-27 implementation of new 24 17 31 21 30 18 04 02 02 17 secondary education Selection approaches to assessing the quality of education BEMP/CQS/1.1/64 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools 2020-03- 2020-06- 2020-07- 2020-06- 2020-08- 2020-06- 2020-09- 2020-10- 2021-03- reconstruction and capital IBRD / 85290 Post Qualification Open - National 5,982.20 Signed 2020-06-15 receiving students from 10 29 13 02 12 24 16 08 15 repairs of GSE facilities in Selection closed/reorganized schools Vitebsk Oblast – 2018 (Liozno, Volynets) BEMP/AF/2.5/1-1 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “Management system modernization of general secondary educat BEMP/AF/2.5/1-2 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “Using combined complexes of physics, chemistry, biology and BEMP/AF/2.5/1-3 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “New approaches to the education quality assessment”; BEMP/AF/2.5/1-4 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “Improving the educational environment of educational instit BEMP/AF/2.5/1-5 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “Organization of educational institutions activities as soci BEMP/AF/2.5/1-6 / Rendering consulting services for the development of scientific and methodological Modernization of system Consultant support of the educational 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 programme for advanced 10 13 26 25 30 28 secondary education Selection training of heads of general secondary education institutions “Education quality management BEMP/AF/1.4/3 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2020-07- 2020-06- 2020-08- 2020-09- 2020-09- 2020-11- 2020-10- 2021-01- 2020-11- 2021-02- 2020-12- 2021-04- 2021-12- IBRD / 89430 Post Open - National 205,040.41 Signed 2020-06-09 reconstruction and capital receiving students from Based Selection 14 30 13 17 10 23 10 29 14 24 19 06 19 repairs of GSEIs (Mogilev closed/reorganized schools region) BEMP/AF/1.1/9 / Ensuring a quality learning Development of construction environment in schools Quality And Cost- 2020-07- 2020-10- 2020-12- 2020-10- 2021-01- 2020-11- 2021-01- 2021-01- 2021-03- 2021-02- 2021-04- 2021-05- 2022-04- design documentation for IBRD / 89430 Post Open - National 135,891.71 Signed 2020-09-30 receiving students from Based Selection 27 21 04 29 01 27 31 28 07 17 11 07 11 reconstruction and capital closed/reorganized schools repairs of GSEIs (Brest region) BEMP/AF/1.1/10 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2020-07- 2020-07- 2020-08- 2020-09- 2020-09- 2020-10- 2020-10- 2021-01- 2020-11- 2021-02- 2020-12- 2021-03- 2021-12- IBRD / 89430 Post Open - National 52,785.47 Under Review 2020-06-16 reconstruction and capital receiving students from Based Selection 15 07 20 24 17 26 17 16 21 11 26 29 26 repairs of GSEIs (Gomel closed/reorganized schools region) BEMP/AF/QCBS/1.4/4 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2020-07- 2020-08- 2020-09- 2020-09- 2020-10- 2020-11- 2020-11- 2021-01- 2020-12- 2021-02- 2021-01- 2021-04- 2022-01- IBRD / 89430 Post Open - National 142,667.91 Signed 2020-07-15 reconstruction and capital receiving students from Based Selection 14 05 18 17 16 24 15 29 20 24 24 06 24 repairs of GSEIs (Mogilev closed/reorganized schools region) BEMP/CQS/1.1/63 / Integrated management and Modernization of system Consultant technical supervision of the 2020-05- 2020-09- 2020-10- 2020-07- 2020-11- 2020-07- 2021-01- 2020-08- 2021-07- IBRD / 85290 management in general Post Qualification Open - National 2,734.20 Signed 2020-08-03 reconstruction and capital 15 02 23 16 22 31 10 12 09 secondary education Selection repairs of GSE facilities in Mogilev Oblast – 2019 Page 7 BEMP/AF/CQS/1.1/1 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-07- 2020-09- 2020-10- 2020-09- 2020-11- 2020-10- 2021-01- 2020-10- 2021-07- IBRD / 89430 Post Qualification Open - National 3,500.16 Signed 2020-09-04 reconstruction and capital receiving students from 30 18 09 15 08 21 03 29 02 Selection repairs of GSE facilities in closed/reorganized schools Brest Oblast BEMP/CQS/1.1/67 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-07- 2020-09- 2020-10- 2020-08- 2020-11- 2020-09- 2021-01- 2020-09- 2021-07- IBRD / 85290 Post Qualification Open - National 4,554.90 Signed 2020-09-04 reconstruction and capital receiving students from 07 18 09 11 08 07 03 22 02 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast – 2019 BEMP/CQS/1.1/73 / Integrated management and Modernization of system Consultant technical supervision of the 2020-09- 2020-11- 2021-01- 2020-10- 2021-02- 2020-11- 2021-03- 2020-11- 2021-09- 2021-05- IBRD / 85290 management in general Post Qualification Open - National 15,312.70 Signed 2020-11-09 reconstruction and capital 21 30 13 23 12 09 19 10 15 12 secondary education Selection repairs of GSE facilities in Brest Oblast BEMP/AF/2.5/8-1 / Procurement of consulting services on activities Modernization of system Consultant 2020-04- 2020-06- 2020-07- 2020-08- 2020-10- 2021-04- organization of educational IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-05-27 30 17 31 30 04 02 institution as a socio-cultural secondary education Selection center for work with family and society BEMP/AF/1.1/11 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2021-03- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-09- IBRD / 89430 Post Open - National 0.00 Canceled 2021-03-02 reconstruction and capital receiving students from Based Selection 23 06 03 03 07 11 11 repairs of GSEIs (Grodno closed/reorganized schools region) BEMP/AF/1.3/3 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2021-03- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-09- IBRD / 89430 Post Open - National 0.00 Canceled 2021-03-03 reconstruction and capital receiving students from Based Selection 24 07 04 04 08 12 12 repairs of GSEIs (Vitebsk closed/reorganized schools region) BEMP/AF/QCBS/1.1/13 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2020-10- 2020-11- 2021-01- 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- 2021-04- 2021-04- 2021-05- 2022-05- IBRD / 89430 Post Open - National 0.00 2020-11-05 reconstruction and capital receiving students from Based Selection Implementation 28 26 09 15 06 15 08 16 12 28 17 17 repairs of GSEIs (Gomel closed/reorganized schools region, 6 objects) BEMP/CQS/1.1/74 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-11- 2020-11- 2021-01- 2020-12- 2021-02- 2020-12- 2021-03- 2021-01- 2021-09- IBRD / 85290 Post Qualification Open - National 10,218.94 Signed 2020-11-05 reconstruction and capital receiving students from 05 26 09 14 08 30 15 18 11 Selection repairs of GSE facilities in closed/reorganized schools Gomel Oblast BEMP/3/53 / Consulting Consultant services for performing the Project implementation 2020-07- 2020-12- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-09- 2020-12- IBRD / 85290 Post Qualification Open - National 173.28 Completed 2020-11-11 functions of technical support 21 02 15 17 14 22 21 22 17 04 Selection supervision of current repairs BEMP/CQS/1.1/76 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-11- 2020-12- 2021-02- 2020-12- 2021-03- 2020-12- 2021-04- 2021-01- 2021-07- IBRD / 85290 Post Qualification Open - National 9,625.60 Signed 2020-11-27 reconstruction and capital receiving students from 11 18 16 16 18 29 29 25 28 Selection repairs of GSE facilitiy in closed/reorganized schools Mogilev Oblast (Slavgorod) BEMP/CQS/1.1/77 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-11- 2020-12- 2021-02- 2020-12- 2021-03- 2020-12- 2021-04- 2021-01- 2021-10- IBRD / 85290 Post Qualification Open - National 2,512.44 Signed 2020-12-02 reconstruction and capital receiving students from 11 23 05 08 07 29 11 15 08 Selection repairs of GSE facilitiy in closed/reorganized schools Mogilev Oblast (Lopatichi) BEMP/CQS/1.1/81 / Integrated management and Modernization of system Consultant technical supervision of the 2021-01- 2021-01- 2021-03- 2021-02- 2021-04- 2021-03- 2021-05- 2021-03- 2021-11- IBRD / 85290 management in general Post Qualification Open - National 5,870.00 Signed 2020-12-30 reconstruction and capital 12 20 05 03 04 01 09 10 05 secondary education Selection repairs of GSE facilities in Brest Oblast BEMP/AF/1.5/4 / Organizing and conducting an assessment of the quality of Modernization of system Consultant 2021-02- 2021-02- 2021-03- 2021-04- 2021-06- 2021-12- the educational environment IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2021-01-18 25 08 31 30 04 01 in institutions of general secondary education Selection secondary education participating in the Project. BEMP/3/53-1 / Consulting Consultant services for performing the Project implementation 2021-02- 2021-02- 2021-02- 2021-04- 2021-03- 2021-05- 2021-03- 2021-06- 2021-03- 2021-12- IBRD / 85290 Post Qualification Open - National 614.45 Signed 2021-02-01 functions of technical support 01 22 02 07 17 07 17 11 03 08 Selection supervision of current repairs BEMP/AF/QCBS/1.1/14 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-02- 2021-03- 2021-05- 2021-03- 2021-06- 2021-04- 2021-09- 2021-10- 2021-12- 2022-05- IBRD / 89430 Post Open - National 0.00 2021-02-15 reconstruction and capital receiving students from Based Selection Implementation 05 17 16 26 30 26 18 22 09 18 repairs of GSEIs (Minsk closed/reorganized schools region, 8 objects) BEMP/AF/CQS/1.1/3 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2021-02- 2021-03- 2021-05- 2021-03- 2021-06- 2021-04- 2021-07- 2021-04- 2021-11- IBRD / 89430 Post Qualification Open - National 2,512.80 Signed 2021-02-10 reconstruction and capital receiving students from 03 12 11 12 10 07 22 07 19 Selection repairs of GSE facilities in closed/reorganized schools Minsk Oblast (Pogost) BEMP/AF/CQS/1.1/2 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools 2021-02- 2021-03- 2021-05- 2021-03- 2021-06- 2021-04- 2021-07- 2021-04- 2022-02- reconstruction and capital IBRD / 89430 Post Qualification Open - National 17,172.21 Signed 2021-02-09 receiving students from 03 11 10 22 09 08 21 20 16 repairs of GSE facilities in Selection closed/reorganized schools Gomel Oblast (Glazovka, Oktiabskiy, Svetilovichi) BEMP/AF/QCBS/1.1/15 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-02- 2021-03- 2021-05- 2021-04- 2021-07- 2021-05- 2021-09- 2021-11- 2021-12- 2022-05- IBRD / 89430 Post Open - National 0.00 2021-02-25 reconstruction and capital receiving students from Based Selection Implementation 05 27 26 12 10 27 28 01 19 28 repairs of GSEIs (Brest region, closed/reorganized schools 8 objects) BEMP/LCS/3/54 / Financial Project implementation Least Cost 2021-02- 2021-03- 2021-04- 2021-02- 2021-05- 2021-03- 2021-06- 2021-03- 2021-07- 2021-03- 2021-08- 2021-04- 2022-02- 2021-05- IBRD / 85290 Post Open - National 3,599.10 Completed 2021-02-14 audit of the project – 2020 support Selection 10 07 20 25 18 19 17 22 22 23 26 08 22 15 BEMP/CQS/1.1/83 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools Under 2021-02- 2021-03- 2021-05- 2021-03- 2021-06- 2021-05- 2021-08- 2022-03- reconstruction and capital IBRD / 85290 Post Qualification Open - National 0.00 2021-02-26 receiving students from Implementation 18 19 18 22 17 20 05 13 repairs of GSE facilities in Selection closed/reorganized schools Brest Oblast (Nacha, Perkovichi) BEMP/AF/1.1/12 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-03- 2021-04- 2021-06- 2021-05- 2021-07- 2021-06- 2021-09- 2021-10- 2021-11- 2022-11- IBRD / 89430 Post Open - National 0.00 2021-04-05 reconstruction and capital receiving students from Based Selection Implementation 15 26 09 21 07 21 05 10 14 14 repairs of GSEIs (Minsk closed/reorganized schools Region) BEMP/AF/CQS/1.1/4 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools Under 2021-03- 2021-04- 2021-06- 2021-04- 2021-07- 2021-05- 2021-08- 2021-11- IBRD / 89430 Post Qualification Open - National 0.00 2021-03-16 reconstruction and capital receiving students from Implementation 09 06 05 26 05 19 23 01 Selection repairs of GSE facilities in closed/reorganized schools Minsk Oblast (Bokshitsy) Page 8 BEMP/AF/2.5/1-6-1 / Rendering consulting services for the development of scientific and methodological Modernization of system Consultant support of the educational Under 2021-03- 2021-04- 2021-05- 2021-05- 2021-06- 2021-07- 2022-01- IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-03-12 programme for advanced Implementation 11 11 25 20 24 29 25 secondary education Selection training of heads of general secondary education institutions “Education quality management BEMP/AF/1.5./4 / Organizing and conducting an assessment of the quality of Modernization of system Consultant 2021-03- 2021-03- 2021-05- 2021-04- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- the educational environment IBRD / 89430 management in general Post Qualification Open - National 38,000.00 Signed 2021-03-04 04 25 08 20 07 06 12 14 08 in institutions of general secondary education Selection secondary education participating in the Project. BEMP/AF/QCBS/1.1/16 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-04- 2021-05- 2021-07- 2021-09- 2021-12- 2022-01- 2022-03- 2022-03- IBRD / 89430 Post Open - National 0.00 2021-04-30 reconstruction and capital receiving students from Based Selection Implementation 21 30 29 12 01 05 02 22 repairs of GSEIs (Minsk closed/reorganized schools region, 5 objects) BEMP/AF/2.5/1-1-1 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 16 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “Management system modernization of general secondary educat BEMP/AF/2.5/1-2-2 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 19 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “Using combined complexes of physics, chemistry, biology and BEMP/AF/2.5/1-3-3 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 19 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “New approaches to the education quality assessment”; BEMP/AF/2.5/1-4-4 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 19 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “Improving the educational environment of educational instit BEMP/AF/2.5/1-5-5 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 19 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “Organization of educational institutions activities as soci BEMP/AF/QCBS/1.1/17 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-04- 2021-06- 2021-08- 2021-09- 2021-12- 2022-01- 2022-03- 2022-10- IBRD / 89430 Post Open - National 0.00 2021-05-14 reconstruction and capital receiving students from Based Selection Implementation 28 13 12 26 15 19 16 02 repairs of GSEIs (Minsk closed/reorganized schools region, 5 objects, Starye dorogi) BEMP/AF/QCBS/1.1/18 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-04- 2021-06- 2021-08- 2021-09- 2021-12- 2022-01- 2022-03- 2022-04- IBRD / 89430 Post Open - National 0.00 2021-05-14 reconstruction and capital receiving students from Based Selection Implementation 29 13 12 26 15 19 16 05 repairs of GSEIs (Gomel closed/reorganized schools region, 5 objects) BEMP/CQS/1.1/88 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools Under 2021-05- 2021-05- 2021-07- 2021-08- 2021-10- 2022-05- reconstruction and capital IBRD / 85290 Post Qualification Open - National 0.00 2021-05-10 receiving students from Implementation 07 31 30 29 17 25 repairs of GSE facilities in Selection closed/reorganized schools Brest Oblast (Bostun, Mikashevichi, Kroshin, Mir) BEMP/CQS/1.1/90 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools Under 2021-05- 2021-06- 2021-08- 2021-09- 2021-10- 2022-06- IBRD / 85290 Post Qualification Open - National 0.00 2021-05-18 reconstruction and capital receiving students from Implementation 27 08 07 06 25 02 Selection repairs of GSE facilities in closed/reorganized schools Brest Oblast (Kossovo) BEMP/AF/QCBS/1.1/19 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-04- 2021-06- 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-12- IBRD / 89430 Post Open - National 0.00 2021-06-04 reconstruction and capital receiving students from Based Selection Implementation 27 25 08 05 05 09 14 14 repairs of GSEIs (Gomel closed/reorganized schools region, 6 objects) BEMP/AF/QCBS/1.1/20 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-05- 2021-06- 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-12- IBRD / 89430 Post Open - National 0.00 2021-06-04 reconstruction and capital receiving students from Based Selection Implementation 31 25 08 05 05 09 14 14 repairs of GSEIs (Brest region, closed/reorganized schools 7 objects) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Actual Amount Draft Negotiated Description Component Review Type Method Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. Approach (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/AF/2.2/19-14 / Procurement of services Modernization of system Individual 2020-04- 2020-05- 2020-06- 2020-12- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2020-04-22 27 18 22 19 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/8-1 / Payment Modernization of system Individual for services of consultants - 2019-12- 2021-02- 2020-01- 2021-03- 2020-02- 2021-04- 2020-03- 2021-10- 2020-06- IBRD / 89430 management in general Post Consultant Limited 334.12 Completed 2021-02-19 coordinators involved into 26 24 29 17 28 21 03 18 25 secondary education Selection PISA-2021 testing BEMP/AF/2.2/8-29 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 245.23 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing Page 9 BEMP/AF/2.2/8-28 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 245.23 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-27 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 245.23 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-26 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 357.45 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-24 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 256.97 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-22 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 469.29 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-21 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 458.09 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-23 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 357.45 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-20 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 469.29 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-19 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 256.67 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-18 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 469.29 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-17 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 256.97 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-16 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 460.44 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-15 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 470.88 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-14 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 190.32 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-13 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 179.89 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-12 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 191.38 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-11 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 191.38 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-9 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 300.45 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-8 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 300.45 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-7 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 167.06 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-6 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 176.97 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-5 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 200.10 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-4 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 189.09 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-3 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 255.78 Completed 2020-02-19 26 24 29 16 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-10 / Procurement of consulting Modernization of system Individual 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-09- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 370.21 Completed 2020-01-13 26 18 29 08 28 14 03 10 25 for conducting PISA-2021 secondary education Selection testing Page 10 BEMP/AF/2.2/8-2 / Procurement of consulting Modernization of system Individual 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-09- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 389.17 Completed 2020-01-13 26 18 29 08 28 14 03 10 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-30 / Procurement of consulting Modernization of system Individual 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-09- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 245.23 Completed 2020-01-13 26 18 29 08 28 14 03 10 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-25 / Procurement of consulting Modernization of system Individual 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-09- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 391.05 Completed 2020-01-13 26 18 29 08 28 14 03 10 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-31 / Procurement of consulting Modernization of system Individual 2019-12- 2020-04- 2020-01- 2020-05- 2020-02- 2020-06- 2020-03- 2020-12- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 311.38 Completed 2020-04-15 26 25 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-32 / Procurement of consulting Modernization of system Individual 2019-12- 2020-04- 2020-01- 2020-05- 2020-02- 2020-06- 2020-03- 2020-12- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 356.55 Completed 2020-04-15 26 25 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/3/51 / Individual consultant on adjustment of the procurement strategy, procurement plan and on Individual preparation of the Project Project implementation 2020-03- 2020-06- 2020-03- 2020-06- 2020-04- 2020-08- 2020-04- 2021-01- 2020-12- IBRD / 85290 Post Consultant Direct 2,656.55 Completed 2020-05-29 Operating Manual of the support 16 08 31 29 04 03 04 30 31 Selection “Belarus Higher Education Modernization Project” within the framework of the “Belarus Education Modernization Proje BEMP/AF/2.4/4 / Procurement of consultants for pre-project survey, TOR preparation and system modules development. Pre- Modernization of system Individual 2020-04- 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2021-03- school education. Consulting IBRD / 89430 management in general Post Consultant Open 8,104.20 Signed 2020-06-16 07 04 31 25 01 29 02 28 services "Analytics of business secondary education Selection processes of collecting, processing and analyzing data from pre-school educational institu BEMP/AF/2.4/5 / Procurement of consultants for pre-project survey, TOR preparation and system modules development. Modernization of system Individual Vocational and secondary 2020-04- 2020-08- 2020-07- 2020-08- 2020-07- 2020-09- 2020-07- 2021-03- IBRD / 89430 management in general Post Consultant Open 4,904.46 Signed 2020-06-16 special education. 07 04 07 25 10 29 10 28 secondary education Selection Consulting services "Analytics of business processes of collecting, processing and analyzing data from vocation BEMP/AF/2.4/6 / Procurement of consultants for pre-project survey, TOR preparation and system modules development. Higher Modernization of system Individual 2020-09- 2020-08- 2020-10- 2020-08- 2020-10- 2020-09- 2020-11- 2021-03- and postgraduate education. IBRD / 89430 management in general Post Consultant Open 8,318.42 Signed 2020-06-16 24 04 14 25 16 29 04 28 Consulting services "Analytics secondary education Selection of business processes of collecting, processing and analyzing data from higher and postgra BEMP/AF/2.4/7 / Procurement of consultants to ensure the development of terms of reference for the creation of an education Modernization of system Individual 2020-04- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2021-03- management information IBRD / 89430 management in general Post Consultant Open 4,718.60 Signed 2020-06-16 07 04 01 25 03 29 03 28 system. Consulting services secondary education Selection "Technical Consultant. Analytics of business processes of collecting, processing and analyzing BEMP/3/44 / development of a framework document for Individual environmental protection of Project implementation 2019-05- 2020-08- 2019-06- 2020-09- 2019-06- 2020-10- 2019-06- 2021-04- 2020-04- IBRD / 85290 Post Consultant Open 1,260.89 Completed 2020-06-23 the project Modernization of support 26 11 14 01 14 06 14 04 15 Selection Higher Education of the Republic of Belarus BEMP/AF/1.5/1 / adaptation Ensuring a quality learning Individual to the socio-cultural realities environment in schools 2020-06- 2020-12- 2020-09- 2020-12- 2020-09- 2021-01- 2020-09- 2021-07- IBRD / 89430 Post Consultant Open 1,782.74 Signed 2020-10-14 of the Russian translation of receiving students from 04 02 01 23 01 27 11 26 Selection the toolkit OCED closed/reorganized schools BEMP/1.5/2 / adaptation to Ensuring a quality learning Individual the socio-cultural realities of environment in schools 2020-06- 2020-12- 2020-09- 2020-12- 2020-09- 2021-01- 2020-09- 2021-07- IBRD / 89430 Post Consultant Open 667.36 Signed 2020-10-14 translation of the toolkit into receiving students from 04 02 01 23 01 27 11 26 Selection Belarusian closed/reorganized schools BEMP/AF/2.1/1 / Development of tools for the Modernization of system Individual 2020-10- 2020-12- 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-08- psychological examination of IBRD / 89430 management in general Post Consultant Open 4,101.14 Signed 2020-11-06 23 25 10 15 10 19 19 18 textbooks for institutions of secondary education Selection general secondary education BEMP/AF/2.1/2 / Development of a matrix for a Modernization of system Individual comprehensive assessment of 2020-10- 2021-01- 2021-02- 2021-01- 2021-02- 2021-03- 2021-03- 2021-08- IBRD / 89430 management in general Post Consultant Open 20,785.36 Signed 2020-11-19 teaching aids for institutions 23 07 10 28 15 04 01 31 secondary education Selection of general secondary education BEMP/AF/2.3/2-2 / Substantive multi-component analysis of the official results Modernization of system Individual 2020-06- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-09- of the PISA study in Belarus, IBRD / 89430 management in general Post Consultant Open 3,420.41 Signed 2020-12-01 04 19 01 09 07 16 11 12 conducted in 2018, and secondary education Selection preparation based on the analysis of the report BEMP/AF/2.3/2-3 / Substantive multi-component analysis of the official results Modernization of system Individual 2020-06- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-09- of the PISA study in Belarus, IBRD / 89430 management in general Post Consultant Open 3,990.49 Signed 2020-12-01 04 19 01 09 04 16 11 12 conducted in 2018, and secondary education Selection preparation based on the analysis of the report BEMP/AF/2.3/2-4 / Substantive multi-component analysis of the official results Modernization of system Individual 2020-06- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-09- of the PISA study in Belarus, IBRD / 89430 management in general Post Consultant Open 3,383.81 Signed 2020-12-01 04 19 01 09 01 16 11 12 conducted in 2018, and secondary education Selection preparation based on the analysis of the report BEMP/AF/2.3/2-5 / Substantive multi-component analysis of the official results Modernization of system Individual 2020-06- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-10- 2021-09- of the PISA study in Belarus, IBRD / 89430 management in general Post Consultant Open 3,383.81 Signed 2020-12-01 04 19 02 09 02 16 19 12 conducted in 2018, and secondary education Selection preparation based on the analysis of the report Page 11 BEMP/AF/2.3/2-1 / Substantive multi-component analysis of the official results Modernization of system 2020-06- 2020-12- 2020-10- 2021-02- 2020-10- 2021-08- of the PISA study in Belarus, IBRD / 89430 management in general Post Direct Selection Direct 21,330.92 Signed 2020-12-01 04 11 12 14 19 13 conducted in 2018, and secondary education preparation based on the analysis of the report BMP/AF/2.2/9-1 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-2 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-3 / Procurement of services Modernization of system Individual 2021-04- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 23 07 12 10 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-4 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-5 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-6 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-7 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-09- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 09 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-8 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-9 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-10 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-11 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-12 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-13 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/10-2 / Procurement of consulting Modernization of system Individual 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 776.28 Completed 2021-01-18 20 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-3 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 779.15 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-4 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 779.15 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-5 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 636.87 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-6 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 426.85 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-7 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 636.87 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-8 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 494.59 Completed 2021-01-18 02 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-9 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 745.28 Completed 2021-01-18 02 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-10 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 636.87 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-11 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 603.00 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing Page 12 BEMP/AF/2.2/10-12 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 352.30 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-13 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 567.16 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-14 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 494.59 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-15 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 142.28 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-16 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 567.16 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-17 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-18 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 962.14 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-19 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-20 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-21 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-22 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-23 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 853.70 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-24 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 962.10 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-25 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 962.10 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-26 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 785.97 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-27 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 887.58 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-28 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 785.97 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-29 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 392.98 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-30 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 359.11 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/1.5/3 / Organizing and conducting an assessment of the quality of Modernization of system Individual 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- 2021-09- the educational environment IBRD / 89430 management in general Post Consultant Direct 21,305.28 Signed 2021-01-18 20 01 15 22 11 29 21 25 in institutions of general secondary education Selection secondary education participating in the Project. BEMP/AF/2.2/10-1 / Procurement of consulting Modernization of system Individual 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant 819.83 Completed 2021-01-20 20 30 05 20 25 27 19 23 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-31 / Procurement of consulting Modernization of system Individual 2021-02- 2021-03- 2021-03- 2021-05- 2021-11- services of test-administrator IBRD / 89430 management in general Post Consultant Open 0.00 Canceled 2021-01-20 01 10 31 05 01 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2./10-32 / Procurement of consulting Modernization of system Individual 2021-02- 2021-03- 2021-03- 2021-05- 2021-11- services of test-administrator IBRD / 89430 management in general Post Consultant Open 0.00 Canceled 2021-01-20 04 10 31 05 01 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-32 / Procurement of consulting Modernization of system Individual 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-04- 2021-02- 2021-10- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 392.98 Completed 2021-02-07 02 17 05 10 25 14 19 11 11 for conducting PISA-2022 secondary education Selection testing Page 13 BEMP/AF/2.2/10-31. / Procurement of consulting Modernization of system Individual 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-04- 2021-02- 2021-10- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 392.98 Completed 2021-02-07 02 17 05 10 25 14 19 11 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.3/4 / Development of recommendations on the Modernization of system Individual 2021-03- 2021-05- 2021-06- 2021-07- 2022-01- formation of an educational IBRD / 89430 management in general Post Consultant Open 0.00 Canceled 2021-03-15 16 28 18 23 19 policy in the Republic of secondary education Selection Belarus based on the results of the PISA study BEMP/AF/2.4/8 / Providing consulting services in the Modernization of system Individual process of pre-project survey Under 2021-04- 2021-05- 2021-06- 2021-07- 2022-01- IBRD / 89430 management in general Post Consultant Open 0.00 2021-03-15 of the current state of the Implementation 29 14 04 09 05 secondary education Selection system for collecting and analyzing labor market data BEMP/AF/2.2/11-1 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 1,842.68 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-2 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 762.49 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-3 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 762.49 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-4 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 1,429.42 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-5 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 1,429.42 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-6 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 740.23 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-7 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 740.23 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-8 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 740.23 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-9 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 740.23 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-10 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-11 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-12 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-13 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-14 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-15 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-16 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 1,084.83 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.3/4-1 / consulting services of an expert with relevant international experience in Modernization of system Individual order to develop Under 2021-06- 2021-06- 2021-06- 2021-07- 2021-08- 2022-02- IBRD / 89430 management in general Post Consultant Direct 0.00 2021-05-31 recommendations for the Implementation 08 17 10 08 12 08 secondary education Selection development of educational policy in the Republic of Belarus based on the results of the PISA-2018 study BEMP/AF/2.3/4-2 / consulting services of an expert with relevant national experience in order to Modernization of system Individual Under 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- 2022-02- develop recommendations for IBRD / 89430 management in general Post Consultant Direct 0.00 2021-05-31 Implementation 31 17 10 08 12 08 the development of secondary education Selection educational policy in the Republic of Belarus based on the results of the PISA-2018 study Page 14 PROCUREMENT PLAN Project information: Lao PDR - Public Finance Management Reform Grant Project Implementation agency: Ministry of Finance Date of the Procurement Plan: October 12, 2018 Period covered by this Procurement Plan: at least 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Law and the Instruction on Implementation Public Procurement Law, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. a) The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; b) Information related to award of contract including reasons for rejection of unsuccessful bidders shall be published on the implementing agency websites and/or newspaper of wide circulation. c) All complaints on procurement related matters including complaints arising from procurement under Bank financed Projects whilst using National Procurement Procedures shall be dealt with in accordance with Article 33 of the Procurement Decree. Borrower shall put in place an effective complaints review mechanism for dealing with procurement related complaints, and shall disclose the details in all the bidding documents. All complaints shall be recorded by the 1 Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. I. Works and Goods and Non-Consultant Services 1.1.Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Annex II of the Procurement Regulations: Category Procurement Method Prior Review Thresholds Thresholds Applicable Remarks Applicable Remarks thresholds thresholds (US$) (US$) Works RFB through ≥ 2.0 million – Above 10 million This has not been Open foreseen at the International project preparation market stage. approach RFB through ≥ 200,000 < – None - Open National 2.0 million market approach Request for < 200,000 – None – Quotation Direct Selection None No threshold; Same as for This has not been meet competitive foreseen at the requirements of selection project preparation regulations stage. 7.13-7.15 Goods and Non-Consulting Services 2 RFB through ≥ 0.6 million – Above US$ 2 This has not been Open million foreseen at the International project preparation market stage. approach RFB through ≥ 100,000 < - None Risk-based approach Open National 0.6 million market approach Request for < 100,000 None Quotation Direct Selection None No threshold; Same as for This has not been meet competitive foreseen at the requirements of selection project preparation regulations stage. 7.13-7.15 1.2 Procurement packages for Goods (prior and post reviews) with method and Time Schedule Ref. Contract (Description) Estimat Procurem Revie Expecte Comme No. ed Cost ent w by d Bids nts (US$) Method Bank Opening (Prior Date / Post) G-01 ICT equipment for MoHA 50,000 RFQ Post Feb 15, and Project 2019 Implementation Unit G-02 Office furniture, printers, 10,000 Shopping Post Feb 15, etc for PIU 2019 G-03 Financial Management 5,000 Shopping Post Feb 15, software 2019 Total Goods 65,000 II. Selection of Consultants 2.1 Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II of the Procurement Regulations: Procurement Method Thresholds Prior Review Thresholds Applicable Applicable Category thresholds Remarks thresholds Remarks (US$) (US$) QCBS, QBS, FBS, ≥ 300,000 Shortlist of only ≥ 1.0 million Risk-based LCS (Using the National Consultants approach most appropriate (Firms) for contract market approach) agreed in the PP CQS (Open or < 300,000 QCBS, QBS, FBS, LCS) None limited can be applied for competition contracts with value through national or under $300,000 international market approach, specified in the PP and agreed with the Bank. 3 Direct Selection of None No threshold; meet Same as for This has not firms requirements of competitive been foreseen regulations 7.13-7.15 selection at the project preparation stage. Individual N/A Essential individual ≥ 300,000 Risk-based Consultants depending assignments will be and for the approach on nature of defined in the positions as services Procurement Plan specified in agreed with the Bank the PP and in line with agreed with regulations 7.34-7.39 the Bank using the most appropriate market approach 2.2 Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 7.1, Section VII of the Procurement Regulations. 2.3 Consultancy Assignments with Selection Methods and Time Schedule Ref. Description of Estimat Selecti Review Expected Comme No. Assignment ed Cost on by Proposals nts US$ Metho Bank Submissio d (Prior / n Date Post) IC-01 PIU Coordinator 36,000 IC Post Jan. 10, 2019 IC-02 PIU Assistant 15,000 IC Post Jan. 10, 2019 IC-03 Financial Management 36,000 IC Post Jan. 10, Consultant* 2019 IC-04 Procurement Consultant 36,000 IC Post Jan. 10, 2019 IC-05 Procurement Assistant 15,000 IC Post Jan. 10, 2019 IC-06 Accountant* 24,000 IC Post Jan. 10, 2019 IC-07 M&E Consultant 30,000 IC Post Jan. 10, 2019 IC-08 Change Management 30,000 IC Post Feb. 15, Consultant 2019 CQS- Audit Firm* 30,000 CQS Post Feb. 15, 01 2019 QCBS - Consulting services for the 500,000 QCBS Post April 2019 01 preparation of the technical specifications and bidding documents for FMIS* Total consulting services 757,000 Total Goods and Consulting 817,000 Services * Although these packages are subject to procurement Post Review, the World Bank will do technical review. 4 Note: 1. To select external financial audit, project implementing agencies shall send their RFPs to all three qualified firms namely PwC, KPMG and EY; that are acceptable audit firms for bank financed projects in the Lao PDR. 5 PROCUREMENT Lao People's Democratic Republic : Lao PDR Public Finance Management Reform Project PLAN General Information Country: Lao People's Democratic Republic Bank’s Approval Date of the Original Procurement Plan: 2019-01-21 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167661 GPN Date: 2019-01-10 Project Name: Lao PDR Public Finance Management Reform Project Loan / Credit No: TF / A9517, / M Executing Agency(ies): inistry of Finance WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Enhanced G-01 / ICT equipment for budget preparation and Request for Single Stage - One MoHA and Project TF / A9517 Post Limited 50,000.00 63,955.08 Signed 2019-07-05 2019-12-12 2019-08-20 2020-01-24 2020-02-16 execution and Quotations Envelope Implementation Unit interoperability of government PFM systems Component 4: Public G-02 / Office furniture, Financial Management (PFM) Request for Single Stage - One TF / A9517 Post Limited 10,000.00 11,468.71 Signed 2019-01-16 2019-07-11 2019-03-13 2019-09-04 2019-09-09 printers, etc for PIU Reform and Program Quotations Envelope Coordination Component 4: Public G-03 / Financial Management Financial Management (PFM) Request for Single Stage - One TF / A9517 Post Limited 5,000.00 2,200.00 Signed 2019-08-03 2019-11-04 2019-09-28 2019-12-17 2020-03-26 software Reform and Program Quotations Envelope Coordination Component 4: Public Financial Management (PFM) Request for Single Stage - One G-04 / IT Equipment for PIU TF / A9517 Post Limited 25,000.00 24,268.51 Signed 2019-07-10 2019-07-03 2019-09-04 2019-08-12 2020-03-02 Reform and Program Quotations Envelope Coordination Component 4: Public Pending Financial Management (PFM) Request for Single Stage - One G-05 / Furniture for FPLD TF / A9517 Post Limited 1,200.00 0.00 Implementati 2020-07-20 2020-09-14 2021-03-13 Reform and Program Quotations Envelope on Coordination Component 4: Public G-06 / IT Equipment for PIU Financial Management (PFM) Request for Single Stage - One TF / A9517 Post Limited 5,000.00 13,556.01 Signed 2020-07-20 2020-09-28 2020-09-14 2020-12-04 2021-03-13 and PPMD Reform and Program Quotations Envelope Coordination NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QCBS-01 / Consulting Component 4: Public services for the preparation of Financial Management (PFM) Quality And Cost- the technical specifications / Post Open - International 500,000.00 0.00 Canceled 2019-02-01 2019-02-05 2019-02-22 2019-04-07 2019-05-05 2019-06-04 2019-07-09 2019-08-13 2020-08-12 Reform and Program Based Selection and bidding documents for Coordination FMIS Component 4: Public Consultant Financial Management (PFM) CQS-01 / External Audit Firm TF / A9517 Post Qualification Open - National 30,000.00 129,910.00 Signed 2019-02-01 2019-11-06 2019-02-22 2019-04-07 2019-11-11 2019-05-07 2020-05-04 2019-06-11 2020-05-22 2019-12-08 Reform and Program Selection Coordination QCBS-1 / Consulting services Component 2: Enhanced for the preparation of the budget preparation and Quality And Cost- technical specifications, bid TF / A9517 execution and Prior Open - International 500,000.00 1,048,576.00 Signed 2019-02-28 2019-02-11 2019-03-21 2019-02-11 2019-05-04 2019-07-18 2019-06-01 2019-08-30 2019-07-01 2020-01-21 2019-08-05 2020-06-15 2019-09-09 2020-06-30 2020-09-08 Based Selection evaluation and contract interoperability of supervision government PFM systems Component 2: Enhanced CQS-02 / Excel templates Consultant budget preparation and develop for Budget TF / A9517 Post Qualification Open - National 8,000.00 8,811.00 Signed 2019-09-10 2019-08-01 2019-10-01 2019-11-14 2020-08-06 2019-12-14 2020-10-12 2020-01-18 2020-11-20 2020-07-16 execution and Department Selection interoperability of government PFM systems INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Public Individual Financial Management (PFM) IC-01 / PIU Coordinator TF / A9517 Post Consultant Open 36,000.00 1,515.00 Terminated 2019-01-10 2019-01-01 2019-02-28 2019-06-01 2019-03-21 2019-06-07 2019-04-25 2019-06-28 2019-10-22 Reform and Program Selection Coordination Component 4: Public Individual IC-07 / Monitoring and Financial Management (PFM) TF / A9517 Post Consultant Open 30,000.00 21,780.00 Signed 2019-01-18 2019-01-02 2019-03-08 2019-07-18 2019-03-29 2019-07-19 2019-05-03 2019-08-02 2019-10-30 Evaluation (M&E) Specialist Reform and Program Selection Coordination Page 1 Component 2: Enhanced Individual IC-08 / Change Management budget preparation and TF / A9517 Post Consultant Open 30,000.00 0.00 Canceled 2019-01-18 2020-11-24 2019-03-08 2019-03-29 2019-05-03 2019-10-30 Specialist execution and Selection interoperability of government PFM systems Component 4: Public Individual Financial Management (PFM) IC-02 / PIU Assistant TF / A9517 Post Consultant Open 15,000.00 12,000.00 Signed 2019-01-18 2019-01-02 2019-03-08 2019-03-02 2019-03-29 2019-05-29 2019-07-01 2019-05-24 2019-12-28 Reform and Program Selection Coordination Component 4: Public Individual IC-03 / Financial Financial Management (PFM) TF / A9517 Post Consultant Open 36,000.00 25,200.00 Signed 2019-01-18 2019-01-02 2019-03-08 2019-06-03 2019-03-29 2019-05-28 2019-07-01 2019-06-25 2019-12-28 Management Specialist Reform and Program Selection Coordination Component 4: Public Individual IC-04 / Procurement Financial Management (PFM) TF / A9517 Post Consultant Open 36,000.00 25,200.00 Terminated 2019-01-18 2019-01-01 2019-03-08 2019-02-13 2019-03-29 2019-04-01 2019-07-01 2019-06-28 2019-12-28 Specialist Reform and Program Selection Coordination Component 4: Public Individual Financial Management (PFM) IC-06 / Accountant TF / A9517 Post Consultant Open 24,000.00 24,000.00 Signed 2019-01-18 2019-01-02 2019-03-08 2019-06-24 2019-03-29 2019-06-21 2019-07-01 2019-07-19 2019-12-28 Reform and Program Selection Coordination Component 4: Public Individual IC-09 / Procurement Financial Management (PFM) TF / A9517 Post Consultant Open 32,000.00 31,200.00 Signed 2019-07-15 2019-07-15 2019-09-02 2019-10-30 2019-09-23 2019-12-03 2019-10-28 2020-01-02 2020-04-25 Consultant to Support PPMD Reform and Program Selection Coordination Component 1: Improved Individual IC-10 / Consultant to TF / A9517 domestic revenue Post Consultant Open 24,000.00 22,440.00 Signed 2019-11-18 2019-07-31 2020-01-06 2020-02-05 2020-01-27 2020-02-06 2020-03-02 2020-07-01 2020-08-29 support on tax legislation mobilization Selection Component 2: Enhanced Individual IC-11 / Budget reform budget preparation and TF / A9517 Post Consultant Open 9,000.00 0.00 Canceled 2020-02-03 2020-12-18 2020-03-23 2020-04-13 2020-05-18 2020-11-14 Consultant 1 execution and Selection interoperability of government PFM systems Component 2: Enhanced Individual IC-12 / Budget reform budget preparation and TF / A9517 Post Consultant Open 9,000.00 0.00 Canceled 2020-02-03 2020-12-18 2020-03-23 2020-04-13 2020-05-18 2020-11-14 Consultant 2 execution and Selection interoperability of government PFM systems Component 2: Enhanced DS-01 / Methodology budget preparation and Under TF / A9517 Post Direct Selection Direct 2,000.00 0.00 2020-10-05 2020-12-16 2020-10-15 2020-12-19 2021-06-17 training /NUOL execution and Implementation interoperability of government PFM systems DS-02 / Recruit a local consultant to extract Component 1: Improved Under information from Tax TF / A9517 domestic revenue Post Direct Selection Direct 50,000.00 0.00 2021-03-02 2021-03-03 2021-03-14 2021-05-25 2021-11-21 Implementation Management Information mobilization System (TMIS) Component 1: Improved Individual IC-13 / Data Analysis Under TF / A9517 domestic revenue Post Consultant Limited 7,800.00 0.00 2021-05-25 2021-05-28 2021-05-30 2021-06-20 2021-07-25 2022-01-21 Consultant for RBA Implementation mobilization Selection Page 2 World Bank Assisted National Agricultural Higher Education Project Education Division Indian Council of Agricultural Research Government of India Procurement Plan (Ist Phase – 18 months ) From : May 2017 to Sept.,2018 1 2 I. General 1. Project information Country : India Borrower : Government of India Project Name : NATIONAL AGRICULTURAL HIGHER EDUCATION PROJECT (NAHEP) Project Identification No (ID) : P151072 : -- Project Implementing Agency (PIA): ICAR and all participating Agriculture Universities 2. Bank’s approval Date of the Initial Procurement Plan: 4. Date of General Procurement Notice: 16th December 2016 Period covered by this procurement plan: First 18 months of the project i.e April, 2017 to Sept., 2018 5. Applicable Bank Guideline: a) For Goods ,Works and Non-consulting Services :"Guidelines: Procurement of Goods, Works and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Procurement Guidelines) and revised July 2014; and b) For Consultancy Services :"Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Consultant Guidelines) and revised July 2014; 3 II. Goods, Works and Non-Consulting Services Category Method of Threshold (US$ Prior review Procurement Equivalent) threshold Goods and International Contracts more than All contracts Non- competitive the equivalent of equal to consulting Bidding (ICB) US$ 3 million per or greater than US$2 services(ex contract million equivalent; cluding TI Limited As per para 3.2 of the contracts) International Guideline , all Bidding Contracts more than the equivalent of US $ 100,000 per contract National Contracts more than competitive the equivalent of US$ Bidding (NCB) 100,000 but less than the equivalent of US$ 3 million per contract (with NCB conditions) Shopping ** Up to $100,000 Direct As per para 3.7 of Contracting(DC) Guidelines Community# As per para 3.19 of Participation the guideline Force Account As per para 3.9 of Guidelines Framework As per para 3.6 of Agreements(FA) Guidelines Works ICB Civil works more or All contracts equal to or equivalent of greater than US$10 US$40,000,000 per million equivalent contract NCB Civil works more than 100,000 and upto $40,000,000 (with NCB conditions) Shopping Civil works up to $100,000 DC As per para 3.7 of Guidelines Community As per para 3.19 of participation# the guideline Force Account As per para 3.9 of Guidelines 4 Category Method of Threshold (US$ Prior review Procurement Equivalent) threshold Consultant CQS/LCS Contracts Up to All contracts equal to or s’ Services $300,000 or less per greater than US$1 contract Million equivalent for Single source As per para 3.9-3.11 firms; and equal to or selection (SSS) of Guidelines greater than Individual As per Section V of US$300,000 equivalent contracts Guidelines for individuals QCBS/QBS/FBS for all other cases (i) International >$800,000 shortlist (ii) Shortlist may Up to $800,000 comprise national consultants only * If a transaction comprises several contracts, lots or slices, the aggregate estimated value of all contracts, lots or slices will determine the applicable threshold amount. **State Rate Contracts cannot be used at par with Shopping. If state rate contract exists for an item, the same can be considered as one of the 3 quotations to be sought under shopping procedures. However DGS&D rate contracts are acceptable under any procurement under the Shopping procedure # Community Procurement would be applicable to activities under learning/training pilots It would be based on World Bank “Guidance Note For Management of Procurement Responsibilities In Community-Driven Development Projects dated December 2009 and as included in the Procurement manual. 2. Pre-qualification: Not Applicable 3. Reference to Project Procurement Manual: A Procurement Manual based on World Bank Guidelines “Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers, January 2011,Revised July 2014”and “Selection and Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank Borrowers” has been prepared. All procurements in the project will be governed by the procedures described in the Manual. In case of any inconsistency between the Procurement Manual and the World Bank Guidelines 2011, Revised July 2014, the provisions of the Guidelines shall prevail. 4. Any Other Special Procurement Arrangements (Goods & Works) : A. Contracts procured in advance will be financed under retroactive financing within the specified limits, as agreed to in the Credit Agreement provided 5 they are procured in accordance with agreed processes and procedures for the project and have been cleared as part of procurement plan. B. National Competitive Bidding (NCB) method for procurement of goods, works and non-consulting services as per the above value thresholds will be conducted in accordance with paragraph 3.3 and 3.4 of the World Bank Procurement Guidelines and the following provisions: (i) Only the model bidding documents for NCB agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding; (ii) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access ) along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids; (iii) No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprises from any given State. (iv) Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; (v) Extension of bid validity shall not be allowed with reference to contracts subject to prior review without the prior concurrence of the World Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for prior approved packages, all subsequent requests for extension irrespective of the period. (Such concurrence will be considered by the Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/Employer); (vi) Re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank. (vii) The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project. (viii) Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however for any procurement under the Shopping procedures. (ix) Two or three envelop system will not be used (except when using e- Procurement system assessed and agreed by the Bank). 6 (x) As per 1.1(e) of World Bank Procurement Guidelines, the Association’s right to inspect accounts and records of the bidders, suppliers and contractors will be included in the bidding document. 7 Selection of Consultants 1. Methods and Value thresholds for Consultancy Services Consulting Methods Value Review Arrangements Services Threshold* Consulting i) Quality and Cost Services Based Selection (Firms) (QCBS) ii) Quality Based Selection (QBS) iii) Selection based on a Fixed Budget (FBS) iv) Selection Based on Least Cost First QCBS Contract Basis (LCS) irrespective of value and v) (Selection based Contracts all subsequent on Consultant’s estimated to cost consultancy contracts Qualification equivalent of valued above US$ 1 (CQS) US$ 200,000 or Million will be subject to less per contract. Prior Review by the World Bank. All other contracts vi) Single Source As per the provisions of will be subject to post Selection (SSS)# paragraph 3.8 to review. 3.11 of Consultant Guidelines Individual i) Competitive As per the Consultants Selection provisions of paragraph 5.1 to 5.6 of Consultant Guidelines ii) Single Source As per the Selection (SSS) provisions of paragraph 5.1 and 5.3 to 5.6 of Consultant Guidelines * If a transaction comprises several packages, lots or slices, the aggregate estimated value of contracts will determine the applicable threshold amount. # Irrespective of contract value any hiring of Government or Research Institutes of unique and exceptional nature requires prior no objection of the World Bank on case to case basis. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US $800,000 equivalent per 8 contract, may comprise entirely of national consultants in accordance with the provisions of Para 2.7 the World Bank Consultant Guidelines. 3. Any Other Special Selection Arrangements (Consulting Services) : (a) Contracts procured in advance will be financed under retroactive financing within the specified limits, as agreed to in the Credit Agreement provided procurement is in accordance with agreed processes and procedures for the project. (b) Requests for Expression of Interest (REOI) for assignments expected to cost more than US$ 300,000 shall be advertised in UNDB online in accordance with Para 2.5 of the Consultant Guidelines. With respect to each contract for the employment of individual consultants estimated to cost the equivalent of US $ 30,000 or more, the qualifications, experience, terms of reference and terms of employment of the consultants shall be furnished to the World Bank for its prior review and No Objection iv) Implementing Agency Capacity Building Activities with Time Schedule S. Expected outcome / Start Date Comments No. Activity Description 1 Training in World Bank To familiarise the online STEP system procurement official in Immediate regard to electronic submissions to the Bank. 2 Trainings in Bank To make procurement Within 3 Procurement at ASCI Officials from participating months of AU’s familiar with WB the procurement procedures negotiations 3 Customized training for Based on the learning from all selected official at PIU the project and hands on Within 3 and selected AU’s. experience a customized months of training to be conducted for effectiveness. strengthening the specific understanding for all IA. 9 PROCUREMENT India : National Agricultural Higher Education Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2016-12-16 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151072 GPN Date: 2016-12-16 Project Name: National Agricultural Higher Education Project Loan / Credit No: / , IBRD / 87760 I Executing Agency(ies): ndian Council of Agricultural Research WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-ICAR-18255-CW-RFQ / Project Management and Request for Single Stage - One 2018-05- Refurbishing of office space at / Post Limited 7,500.00 0.00 Canceled 2017-09-28 2017-11-13 Learning Quotations Envelope 12 PIU IN-ICAR-117957-CW-RFQ / Renovation/refurbishing the PIU-NAHEP i.e. the work relates to fixing/repairing of the ceiling tiles, walls wooden Project Management and Request for Single Stage - One 2020-09- IBRD / 87760 Post Limited 23,266.63 25,541.96 Completed 2020-01-30 2019-09-02 2020-03-26 2019-11-13 sections etc in the committee Learning Quotations Envelope 22 room, a reception counter at 5th floor with back wall panelling of wooden frame. Refurbish th toilet/wash room GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-ICAR-18245-GO-RFQ / Project Management and Request for Single Stage - One Procurement of Desktops and / Post Limited 7,800.00 8,346.52 Completed 2017-09-05 2018-12-17 2017-10-31 2019-07-09 2018-04-29 2019-07-21 Learning Quotations Envelope computers at PIU IN-ICAR-18247-GO-RFQ / Project Management and Request for Single Stage - One Procurement of Laptops - 5 / Post Limited 4,000.00 3,563.09 Completed 2017-09-24 2018-12-27 2017-11-19 2019-07-09 2018-05-18 2020-07-28 Learning Quotations Envelope nos. IN-ICAR-18250-GO-RFQ / Project Management and Request for Single Stage - One Procurement of office / Post Limited 7,800.00 3,677.30 Completed 2017-09-09 2019-03-18 2017-11-04 2019-06-12 2018-05-03 2019-07-11 Learning Quotations Envelope furniture 8 nos. IN-ICAR-93438-GO-RFQ / MFP printer (15 nos.), UPS (15 Project Management and Request for Single Stage - One IBRD / 87760 Post Open - National 3,579.27 3,324.78 Completed 2019-01-06 2019-03-03 2020-01-15 2019-08-30 2020-07-28 nos.) and Portable hard drive Learning Quotations Envelope (04 nos.) IN-ICAR-121720-GO-RFQ / purchase of office furniture Project Management and Request for Single Stage - One like revolving chair, file IBRD / 87760 Post Limited 11,700.00 6,564.45 Completed 2019-07-31 2019-07-31 2019-10-01 2019-10-03 2020-03-29 2019-10-22 Learning Quotations Envelope cabinet, center table etc. for PIU IN-ICAR-120876-GO-RFQ / Project Management and Request for Single Stage - One IBRD / 87760 Post Limited 2,400.00 1,677.03 Completed 2019-07-31 2019-08-19 2019-10-01 2019-10-22 2020-03-29 2019-10-22 Refrigerator for PIU (8 Nos.) Learning Quotations Envelope IN-ICAR-117963-GO-RFQ / Project Management and Request for Single Stage - One IBRD / 87760 Post Limited 15,511.09 0.00 Canceled 2019-07-06 2019-09-16 2020-03-14 Furniture purchase for PIU Learning Quotations Envelope IN-ICAR-122473-GO-RFQ / All-in-one Desktop Computer Project Management and Request for Single Stage - One IBRD / 87760 Post Limited 16,000.00 11,596.38 Completed 2019-07-31 2019-07-30 2019-10-01 2019-09-09 2020-03-29 2019-12-13 and multi function printer for Learning Quotations Envelope PIU (10 Nos.) Investments in Indian Council IN-ICAR-188675-GO-RFQ / of Agricultural Research Request for Single Stage - One IBRD / 87760 Post Limited 4,653.00 3,772.68 Completed 2020-09-17 2020-09-17 2020-11-12 2020-11-12 2021-05-11 2021-02-09 Laptop 4 Nos. Leadership in Agricultural Quotations Envelope Higher Education Investments in Indian Council IN-ICAR-200874-GO-RFQ / of Agricultural Research Request for Single Stage - One IBRD / 87760 Post Limited 3,900.00 3,230.98 Completed 2020-11-16 2020-11-08 2021-01-11 2020-12-29 2021-07-10 2021-02-12 All in One Desktop (3 Nos.) Leadership in Agricultural Quotations Envelope Higher Education Investments in Indian Council IN-ICAR-212170-GO-RFQ / of Agricultural Research Request for Single Stage - One IBRD / 87760 Post Limited 1,164.00 1,025.64 Completed 2021-01-25 2021-02-15 2021-03-22 2021-03-09 2021-09-18 2021-03-30 Laptop Qty. 01 No. Leadership in Agricultural Quotations Envelope Higher Education IN-ICAR-231619-NC-RFQ / Investments in Indian Council Pending Up-gradation of online of Agricultural Research Request for Single Stage - One IBRD / 87760 Post Limited 46,533.00 0.00 Implementati 2021-06-11 2021-08-06 2022-02-02 conferencing facilities in Leadership in Agricultural Quotations Envelope on NAHEP Conference Room Higher Education NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-ICAR-220499-NC-RFQ / Investments in Indian Council Under Non-consulting services of of Agricultural Research Request for Single Stage - One IBRD / 87760 Post Limited 60,000.00 0.00 Implementati 2021-02-25 2021-02-24 2021-03-15 2022-08-15 event management of 75 Leadership in Agricultural Quotations Envelope on lecture series India@75 Higher Education Page 1 IN-ICAR-234303-NC-RFQ / Investments in Indian Council Pending Hiring professional vendor for of Agricultural Research Request for Single Stage - One IBRD / 87760 Post Limited 31,022.00 0.00 Implementati 2021-06-11 2021-08-06 2022-02-02 creating a professional video Leadership in Agricultural Quotations Envelope on of 5-6 minutes on NAHEP Higher Education CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-ICAR-4654-CS-QCBS / Project Management and Quality And Cost- Hiring of Consultancy Services / Prior Open - National 373,134.00 0.00 Canceled 2016-12-16 2017-01-03 2016-12-18 2017-02-16 2017-03-16 2017-04-15 2017-05-20 2017-06-24 2018-06-24 Learning Based Selection of a Procurement Consultant IN-ICAR-4651-CS-QCBS / Consultancy for Design, Supply, Installation & Project Management and Quality And Cost- / Prior Open - National 317,910.00 0.00 Canceled 2016-12-16 2016-12-18 2017-01-03 2016-12-19 2017-02-16 2017-03-16 2017-04-15 2017-05-20 2017-06-24 2018-06-24 Maintenance of Agricultural Learning Based Selection Education Digital Information System - AEDIS IN-ICAR-4653-CS-QCBS / Project Management and Quality And Cost- Hiring Consultancy Services of / Prior Open - National 355,224.00 0.00 Canceled 2016-12-16 2016-12-18 2017-01-03 2016-12-18 2017-02-16 2017-03-16 2017-04-15 2017-05-20 2017-06-24 2018-06-24 Learning Based Selection Internal Auditors IN-ICAR-4652-CS-QCBS / Project Management and Quality And Cost- Consultancy for Monitoring & / Prior Open - National 397,016.00 0.00 Canceled 2016-12-16 2016-12-18 2017-01-03 2016-12-18 2017-02-16 2017-03-16 2017-04-15 2017-05-20 2017-06-24 2018-06-24 Learning Based Selection Evaluation IN-ICAR-43642-CS-QCBS / Project Management and Quality And Cost- Consultancy for Monitoring IBRD / 87760 Post Open - National 500,000.00 334,808.76 Signed 2018-01-12 2018-01-12 2018-01-17 2018-02-01 2018-02-28 2018-02-16 2018-04-17 2018-03-03 2018-05-02 2018-04-02 2018-05-15 2018-05-07 2018-10-08 2021-03-31 Learning Based Selection and Evaluation IN-ICAR-43646-CS-QCBS / Project Management and Quality And Cost- Consultancy for Procurement IBRD / 87760 Post Open - National 490,545.00 649,441.37 Signed 2018-01-12 2018-01-12 2018-01-19 2018-02-08 2018-02-28 2018-03-08 2018-02-28 2018-03-23 2018-06-12 2018-04-27 2018-05-26 2018-11-02 2021-03-31 Learning Based Selection Services IN-ICAR-43650-CS-QCBS / Project Management and Quality And Cost- Consultancy for Internal IBRD / 87760 Post Open - National 355,224.00 187,451.80 Signed 2018-01-12 2018-03-05 2018-01-19 2018-02-08 2018-03-31 2018-03-08 2018-09-11 2018-03-28 2018-09-11 2018-04-26 2018-05-25 2018-12-27 2021-03-31 Learning Based Selection Auditors Investments in Indian Council IN-ICAR-180430-CS-CQS / Consultant of Agricultural Research Consultancy for Post IBRD / 87760 Post Qualification Open - National 23,266.00 43,347.02 Signed 2020-07-30 2020-07-07 2020-08-20 2020-07-07 2020-10-03 2020-10-27 2020-11-02 2021-02-08 2020-12-07 2021-02-10 2021-06-05 Leadership in Agricultural procurement review Selection Higher Education IN-ICAR-190174-CS-QCBS / Consultancy for a study on Investments in Indian Council assessment of Human of Agricultural Research Quality And Cost- Under IBRD / 87760 Post Open - National 310,221.80 127,899.24 2020-10-25 2020-10-22 2020-11-15 2020-11-03 2020-12-29 2021-01-25 2021-01-26 2021-02-23 2021-02-25 2021-03-01 2021-04-01 2021-05-24 2021-05-06 2022-05-06 Resource requirements in Leadership in Agricultural Based Selection Implementation Agriculture and allied sectors Higher Education in India under NAHEP IN-ICAR-206240-CS-QCBS / Consultancy services to Investments in Indian Council "Prepare a DPR for IARI to of Agricultural Research Quality And Cost- Under IBRD / 87760 Post Open - National 76,000.00 0.00 2020-12-15 2021-01-13 2021-01-05 2021-02-05 2021-01-27 2021-02-11 2021-02-26 2021-03-20 2021-04-05 2022-04-05 achieve top 200 global Leadership in Agricultural Based Selection Implementation rankings within the next three Higher Education years." INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-ICAR-70469-CS-INDV / Individual Project Management and Consultancy Services for IBRD / 87760 Post Consultant Open 50,000.00 56,950.58 Signed 2018-08-01 2018-09-19 2019-02-01 2018-10-10 2019-03-11 2018-11-14 2019-04-03 2020-03-31 Learning Social Safeguard Specialist Selection IN-ICAR-70474-CS-INDV / Individual Project Management and Consultancy Services for IBRD / 87760 Post Consultant Open 50,000.00 1,425.52 Signed 2018-08-01 2018-09-19 2019-02-01 2018-10-10 2019-02-28 2018-11-14 2019-03-13 2020-03-31 Learning Environment Specialist Selection IN-ICAR-140700-CS-INDV / Individual Individual consultant, Support to Agricultural IBRD / 87760 Post Consultant Limited 19,000.00 0.00 Canceled 2019-11-30 2020-03-04 2019-12-05 2019-12-26 2020-01-30 2020-07-28 international training of Universities Selection faculty and student IN-ICAR-150547-CS-INDV / Individual consultant for media and publicity 01 No. (To provide required support Investments in Indian Council and assistance for the media Individual of Agricultural Research coverage, campaigns and IBRD / 87760 Post Consultant Limited 26,000.00 4,873.26 Signed 2020-01-25 2020-03-05 2020-01-30 2020-03-05 2020-02-20 2020-07-09 2020-03-26 2020-07-27 2020-09-22 Leadership in Agricultural publicity of the project Selection Higher Education activities and miscellaneous events like workshops/trainings, seminars etc. in the project.) Investments in Indian Council IN-ICAR-184580-CS-INDV / Individual of Agricultural Research Consultant for Project IBRD / 87760 Post Consultant Limited 13,960.00 10,829.47 Signed 2020-07-31 2020-07-31 2020-08-05 2020-08-05 2020-08-26 2020-08-02 2020-09-30 2020-09-06 2021-03-31 Leadership in Agricultural Management Learning (PML) Selection Higher Education Page 2 TOGO PROJET : Projet d’Afrique de l’Ouest d'Indentification Unique pour l’intégration et l’inclusion régionale-Phase 2/Composante TOGO No d’identification du projet [P169594] PLAN DE PASSATION DES MARCHES SIMPLIFIE DES FONDS D’AVANCE DE PREPARATION DU PROJET (PPA) VERSION N° 1 I. GENERAL 1. Informations sur le Projet Emprunteur : République Togolaise Entités : Présidence et Ministère de l’Economie Responsables numérique Nom du Projet : Projet d’Afrique de l’Ouest d'Indentification Unique pour l’intégration et l’inclusion régionale- composante TOGO Identification : P169594 CREDIT N° Pas encore disponible Agence chargée de : Unité de mise en œuvre du projet WARCIP la mise en œuvre des fonds d’avance de préparation du projet (PPA) 2. Date d’approbation par la Banque du plan de passation de marchés : [A indiquer] 3. Date de publication de l’Avis Général de Passation des Marchés : Non applicable 4. Période couverte par la Plan de Passation des Marchés : Janvier 2020 à Novembre 2020 5. Evaluation de risque par P-RAMS (Procurement Risk Assessment and Management System) : Elevé Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (juillet 2016, révisé en novembre 2017 et août 2018) (“Règlement de Passation des Marchés”), le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. 2 Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans la loi No 2009-013 du 30 juin 2009 relative aux Marchés Publics et Délégation de Service Public, le Décret Nº 2009-277/PR du 11 novembre 2009 portant Code des Marchés Publics et Délégation de Service Public, et les textes d’application y afférents, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : - Le dossier d’appel d’offres/à propositions oblige le Soumissionnaire/les proposants présentant une Offre/Proposition à déposer un agrément signé, qui sera joint à tout contrat éventuel, pour confirmer qu’il applique et respecte les Directives de la Banque pour la lutte contre la corruption, y compris sans limitation, le droit de la Banque de sanctionner et les droits de la Banque pour l’inspection et l’audit ; - Le droit de la Banque d’examiner le dossier et les activités de passation des marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés ne s’applique pas. II. TRAVAUX, FOURNITURES ET SERVICES AUTRES QUE LES SERVICES DE CONSULTANTS 3 1. Dispositions relatives aux seuils de revue préalable : Seuils requis pour les décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans les paragraphes 3.5 à 3.8 de la Section III, et de l’Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI), en date de Juillet 2016, révisé en Novembre 2017. Catégories de marchés Montants estimatifs Observations des contrats en millions de dollars américains Travaux (incluant clé à main, Fourniture et Installation, et les Partenariat Public - >= 5 Privé -PPP) Biens, Système d’Information et de Services autres que les Services >= 1,5 intellectuels Travaux (incluant clé à main, Fourniture et >= 5 Installation, et les Les justifications de l’entente Contrats à Partenariat Public - directe passer par Privé -PPP) devront être jointes et entente directe Biens, Système approuvées avec PPM d’Information et de Services autres que >= 1,5 les Services intellectuels 2. Pré qualification : Sans objet. 3. Dispositions spéciales sur les marchés : Concernant les acquisitions de véhicules et de carburant, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur d’USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque ou distributeurs de produits pétroliers). Liste des marchés avec les méthodes de passation et les dates de mise en œuvre : Travaux Néant Fournitures et services autres que les services de consultants 1 2 3 4 5 6 7 8 9 4 Ref Ref. Description Coût Méthode Approch Revue Date de Commentai res/Fin . Comp estimatif de e du de la lanceme de prestations N° osant (US$) passatio marché Banque ( nt de la e n des a priori/a procédur marchés posterior e i) 1. 1. 2. Coût total en US$ III. SÉLECTION DES CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable des marchés Décisions de sélection sujette à la revue préalable de la Banque comme indiqué dans Seuils requis pour les décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans les paragraphes 3.5 à 3.8 de la Section III, et de l’Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI), en date de juillet 2016, révisé en novembre 2017 and Août 2018. Méthode de Seuils de revue a priori Observations sélection/Catégories de Montants estimatifs des marchés contrats en millions de dollars américains Méthode compétitive/Firmes de >= 0.5 consultants Entente directe/firmes de Les justifications pour consultants >= 0.5 l’entente directe devront être jointes et approuvées Entente avec le PPM directe/Consultants >= 0.2 individuel Méthode Compétitive >= 0.2 (Comparaison de CVs)/ Consultants individuels 2. Liste restreinte composée entièrement de firmes nationales : La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux en conformité avec les dispositions des 5 Règlement de Passation des marchés., et l’Emprunteur ne procède pas à une publication dans UNDB. 3. Autre arrangement spécial de Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultant est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission ; cependant, ce seuil ne devrait pas dépasser la contre- valeur de USD 300,000 sauf dans des cas exceptionnels telles des situations d’urgence en conformité au Règlement de Passation des marchés. Marchés de Services de Consultants 1. 2. 3. 4. 5. 6. 7. 8. 9. Ref. Ref. Description des Coût Métho Revue de Date de Approch Commen N° Comp missions estimatif de de la lanceme e du tai osant (US$) sélecti Banque nt de la marché res/Fin e on (a procédur de priori/a e prestatio posterior ns i) 1. 2. Coût total en US$ Lexique des Sigles et Abréviations PPM : Plan de Passation des Marchés AOI : Appel d’Offres International AON : Appel d’Offres National DC : Demande de Cotations SFQC : Sélection Fondée sur la Qualité et le Coût SFQ : Sélection Fondée sur la Qualité SQC Sélection fondée sur les Qualifications des : Consultants SMC : Sélection au Moindre Coût CI : Consultant Individuel SD/ED : Sélection Directe/ Entente Directe A Revue a posteriori : posteriori A Priori : Revue a priori PPM : Plan de Passation des Marchés DNCMP Direction Nationale de Contrôle des : Marchés Publics ARMP : Autorité de Régulation des Marchés Publics PROCUREMENT Western Africa : West Africa Unique Identification for Regional Integration and Inclusion - Phase 2 PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2020-04-12 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169594 GPN Date: Project Name: West Africa Unique Identification for Regional Integration and Inclusion - Phase 2 Loan / Credit No: IDA / V3240, IDA / D6110, IDA / D6100 Agence Nationale d’Identification des Personnes - WURI Benin Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BJ-WURI - BENIN-189673-CW- RFP / Petites réfections pour Strengthening the Legal and Request for Single Stage - One 2021-05- IDA / D6100 Post Limited 20,000.00 36,387.61 Signed 2020-09-28 2020-10-08 2020-11-23 2020-12-30 aménagement du siège de Institutional Framework Quotations Envelope 22 l'UGP BJ-WURI - BENIN-216397-CW- Under RFQ / Petites réfections et Establishing Robust and Request for Single Stage - One 2021-12- IDA / D6100 Post Limited 10,069.00 0.00 Implementat 2021-04-20 2021-06-02 2021-06-15 Aménagement des locaux de Inclusive fID Systems Quotations Envelope 12 ion l'UGP BJ-WURI - BENIN-216407-CW- Pending Establishing Robust and Single Stage - One 2022-05- RFB / Aménagement des IDA / D6100 Post Request for Bids Open - National 209,758.00 0.00 Implementat 2021-07-16 2021-07-21 2021-09-01 2021-10-01 2021-11-05 Inclusive fID Systems Envelope 04 locaux des UCIP ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WURI - BENIN-185931-GO- RFQ / Acquisition et Strengthening the Legal and Request for Single Stage - One IDA / D6100 Post Limited 80,000.00 81,877.91 Completed 2020-10-31 2020-08-06 2020-12-26 2020-09-11 2021-06-24 2021-02-03 installation de mobiliers de Institutional Framework Quotations Envelope bureaux de l'UGP BJ-WURI - BENIN-185933-GO- RFQ / Acquisition du Strengthening the Legal and Request for Single Stage - One IDA / D6100 Post Limited 60,000.00 102,563.77 Signed 2020-11-01 2020-10-05 2020-12-27 2020-11-26 2021-06-25 matériels informatiques au Institutional Framework Quotations Envelope profit du projet. BJ-WURI - BENIN-190507-GO- RFP / Acquisition et Strengthening the Legal and Request for Single Stage - One IDA / D6100 Post Limited 60,000.00 54,611.29 Signed 2020-09-28 2020-10-07 2020-11-23 2020-11-27 2021-05-22 installation d'un groupe Institutional Framework Quotations Envelope électrogène et accessoires BJ-WURI - BENIN-195085-GO- RFQ / Fourniture Strengthening the Legal and Request for Single Stage - One IDA / D6100 Post Limited 19,000.00 29,218.92 Signed 2020-11-07 2021-02-02 2021-01-02 2021-03-29 2021-07-01 d'équipement et d'internet au Institutional Framework Quotations Envelope profit de l'UGP BJ-WURI - BENIN-197159-GO- DIR / Acquisition de matériels Strengthening the Legal and roulant (véhicules) aux profit IDA / D6100 Post Direct Selection Direct 152,000.00 217,651.91 Completed 2020-10-12 2020-09-30 2020-10-17 2020-09-18 2020-11-21 2020-12-07 2021-05-20 2021-02-22 Institutional Framework de l’UGP, de l’ANIP et de l’ANPS. BJ-WURI - BENIN-203705-GO- RFQ / Acquisition de matériels Facilitating Access to Services Request for Single Stage - One et fournitures de protection IDA / D6100 Post Limited 10,454.42 17,107.46 Completed 2020-11-14 2020-11-18 2021-01-09 2020-12-21 2021-07-08 2020-12-28 Through fID Credentials Quotations Envelope dans le cadre des activités des enquêtes PMT-RAVIP BJ-WURI - BENIN-203059-GO- DIR / Acquisition de fourniture et consommable de Facilitating Access to Services Request for Single Stage - One IDA / D6100 Post Limited 13,586.55 6,636.58 Completed 2020-11-14 2020-11-18 2021-01-09 2020-12-21 2021-07-08 2020-12-28 bureau dans le cadre des Through fID Credentials Quotations Envelope enquêtes PMT-RSU-RAVIP du ARCH BJ-WURI - BENIN-216276-GO- RFB / Acquisition et livraison Pending de matériels, mobiliers et Establishing Robust and Single Stage - One IDA / D6100 Post Request for Bids Open - National 391,828.00 0.00 Implementati 2021-03-22 2021-03-27 2021-05-08 2021-06-07 2021-07-12 2022-01-08 fournitures de bureau ainsi Inclusive fID Systems Envelope on que des outils de traitement de dossiers au profit de l'ANIP BJ-WURI - BENIN-216408-GO- RFQ / Acquisition de matériels Pending et diverses fournitures dans le Establishing Robust and Request for Single Stage - One IDA / D6100 Post Limited 16,781.00 0.00 Implementati 2021-04-17 2021-06-12 2021-12-09 cadre de la mise en œuvre du Inclusive fID Systems Quotations Envelope on Mécanisme de Gestion des Plaintes et recours BJ-WURI - BENIN-216818-GO- RFQ / Achat des équipements, matériels et fournitures Pending nécessaires à Establishing Robust and Request for Single Stage - One IDA / D6100 Post Limited 47,041.00 0.00 Implementati 2021-04-17 2021-06-12 2021-12-09 l'opérationnalisation de la Inclusive fID Systems Quotations Envelope on cellule d'Assistance aux Plaintes et Recours (CAPR) au sein de l'ANIP BJ-WURI - BENIN-216820-GO- RFQ / Acquisition et livraison Pending de matériels informatiques, Establishing Robust and Request for Single Stage - One IDA / D6100 Post Limited 16,781.00 0.00 Implementati 2021-06-21 2021-08-16 2022-02-12 fournitures de bureau et de Inclusive fID Systems Quotations Envelope on consommables informatiques au profit de l'UGP BJ-WURI - BENIN-216822-GO- Pending RFQ / Acquisition et Establishing Robust and Request for Single Stage - One IDA / D6100 Post Limited 16,781.00 0.00 Implementati 2021-08-17 2021-10-12 2022-04-10 installation d'un système Inclusive fID Systems Quotations Envelope on d'interphone au profit de l'UGP Page 1 BJ-WURI - BENIN-216823-GO- RFQ / Acquisition du matériel Establishing Robust and Request for Single Stage - One IDA / D6100 Post Limited 1,511.00 21,765,190.99 Completed 2021-04-04 2020-11-03 2021-05-30 2020-12-07 2021-11-26 2021-05-04 roulant Inclusive fID Systems Quotations Envelope (moto) au profit de l'UGP BJ-WURI - BENIN-216825-GO- Pending RFQ / Acquisition de Establishing Robust and Request for Single Stage - One IDA / D6100 Post Limited 1,679.00 0.00 Implementati 2021-07-19 2021-09-13 2022-03-12 mobiliers au profit de l'UGP Inclusive fID Systems Quotations Envelope on WURI BJ-WURI - BENIN-216826-GO- RFQ / Acquisition de Establishing Robust and Request for Single Stage - One matériels de communication IDA / D6100 Post Limited 16,697.00 18,466.80 Signed 2021-03-27 2021-04-06 2021-05-22 2021-06-08 2021-11-18 Inclusive fID Systems Quotations Envelope et accessoires au profit de l'UGP BJ-WURI - BENIN-216827-GO- Pending RFB / Acquisition de matériels Facilitating Access to Services Single Stage - One IDA / D6100 Post Request for Bids Open - National 134,245.00 0.00 Implementati 2021-09-15 2021-09-20 2021-11-01 2021-12-01 2022-01-05 2022-07-04 pour la réparation des 1200 Through fID Credentials Envelope on morpho tablettes BJ-WURI - BENIN-216829-GO- Pending RFB / Acquisition de 500 Kits Facilitating Access to Services Single Stage - One IDA / D6100 Post Request for Bids Open - National 839,031.00 0.00 Implementati 2021-08-10 2021-08-15 2021-09-26 2021-10-26 2021-11-30 2022-05-29 (Tablettes, Toiles, Trépieds…) Through fID Credentials Envelope on pour le recencement BJ-WURI - BENIN-216834-GO- RFQ / Acquisition de matériels Pending (Toîles , cachets enrôlement Facilitating Access to Services Request for Single Stage - One IDA / D6100 Post Limited 41,952.00 0.00 Implementati 2021-11-13 2022-01-08 2022-07-07 faits) et des fournitures de Through fID Credentials Quotations Envelope on bureaux dans le cadre de l'enregistrement massif BJ-WURI - BENIN-216836-GO- RFB / Acquisition Pending Facilitating Access to Services Single Stage - One d'équipements, matériels IDA / D6100 Post Request for Bids Open - National 588,278.00 0.00 Implementati 2021-10-15 2021-10-20 2021-12-01 2021-12-31 2022-02-04 2022-08-03 Through fID Credentials Envelope informatiques et de on fournitures au profit des UCIP BJ-WURI - BENIN-216838-GO- RFB / Acquisition des Pending formulaires algorithmés de Facilitating Access to Services Single Stage - One IDA / D6100 Post Request for Bids Open - National 251,709.00 0.00 Implementati 2021-08-19 2021-08-24 2021-10-05 2021-11-04 2021-12-09 2022-06-07 déclaration des faits de l'état Through fID Credentials Envelope on civil en appui à la mise en place du SIGEC BJ-WURI - BENIN-217242-GO- RFQ / Sélection d’un Under Facilitating Access to Services Request for Single Stage - One prestataire pour l’acquisition IDA / D6100 Post Limited 75,515.00 77,308.35 Implementati 2021-03-13 2021-04-26 2021-05-08 2021-11-04 Through fID Credentials Quotations Envelope des fiches d’enroulement on RAVIP BJ-WURI - BENIN-221182-GO- Pending Establishing Robust and Request for Single Stage - One RFQ / Mise en place d’un IDA / D6100 Post Limited 8,391.00 0.00 Implementati 2021-03-20 2021-05-15 2021-11-11 Inclusive fID Systems Quotations Envelope système anti incendie à l'UGP on BJ-WURI - BENIN-221181-GO- RFB / Acquisition de routeurs Pending Facilitating Access to Services Single Stage - One mobiles et des cartes SD dans IDA / D6100 Post Request for Bids Open - National 134,245.00 0.00 Implementati 2021-07-06 2021-07-11 2021-08-22 2021-09-21 2021-10-26 2022-04-24 Through fID Credentials Envelope le cadre de l'enregistrement on massif BJ-WURI - BENIN-221178-GO- RFB / Acquisition de kits Pending d'extension du Stockage du Facilitating Access to Services Single Stage - One IDA / D6100 Post Request for Bids Open - National 912,866.00 0.00 Implementati 2021-08-11 2021-08-16 2021-09-27 2021-10-27 2021-12-01 2022-05-30 RNPP (SAN, Disques, Bandes Through fID Credentials Envelope on de sauvegarde, Robot de backup sur bande, Onduleur) BJ-WURI - BENIN-216837-GO- RFB / Production des Facilitating Access to Services Single Stage - One IDA / D6100 Prior Request for Bids Open - International 2,630,782.00 0.00 Canceled 2021-11-12 2021-11-17 2021-12-29 2022-01-28 2022-03-04 2022-08-31 attestations NPI/fID pour Through fID Credentials Envelope 3000000 personnes BJ-WURI - BENIN-237346-GO- RFB / Acquisition de matériels et consommables Pending informatiques (lot1), de Facilitating Access to Services Single Stage - One IDA / D6100 Post Request for Bids Open - National 1,413,000.00 0.00 Implementati 2021-06-21 2021-06-26 2021-08-07 2021-09-06 2021-10-11 2022-04-09 mobiliers et fournitures de Through fID Credentials Envelope on bureau (Lot2) dans le cadre de la production des Certificats du NPI/fID NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WURI - BENIN-201775-NC- RFQ / Acquisition, Strengthening the Legal and Request for Single Stage - One IDA / D6100 Post Limited 16,781.00 27,528.40 Signed 2020-11-07 2020-11-23 2021-01-02 2021-01-08 2021-07-01 configuration et installation Institutional Framework Quotations Envelope du logiciel de comptabilité BJ-WURI - BENIN-216955-NC- Pending RFQ / Câblage réseau des Establishing Robust and Request for Single Stage - One IDA / D6100 Post Limited 3,357.00 0.00 Implementati 2021-04-17 2021-06-12 2021-12-09 matériels informatiques de Inclusive fID Systems Quotations Envelope on l'UGP BJ-WURI - BENIN-216999-NC- Pending RFQ / Diagnostic et mise en Facilitating Access to Services Request for Single Stage - One IDA / D6100 Post Limited 33,561.00 0.00 Implementati 2021-08-14 2021-10-09 2022-04-07 état de 1200 morpho Through fID Credentials Quotations Envelope on Tablettes BJ-WURI - BENIN-217002-NC- RFQ / Vulgarisation de la Pending Facilitating Access to Services Request for Single Stage - One politique de sécurité des IDA / D6100 Post Limited 25,171.00 0.00 Implementati 2021-10-20 2021-12-15 2022-06-13 Through fID Credentials Quotations Envelope systèmes d’information de on l’Etat Page 2 BJ-WURI - BENIN-217009-NC- RFQ / Recrutement d'un Pending consultant pour la Facilitating Access to Services Request for Single Stage - One IDA / D6100 Post Limited 25,171.00 0.00 Implementati 2021-11-27 2022-01-22 2022-07-21 vulgarisation de la politique Through fID Credentials Quotations Envelope on de protection des infrastructures critiques BJ-WURI - BENIN-217243-NC- RFQ / Recrutement d'un consultant pour l'organisation Pending Facilitating Access to Services Request for Single Stage - One de deux séminaires de IDA / D6100 Post Limited 15,103.00 0.00 Implementati 2021-12-14 2022-02-08 2022-08-07 Through fID Credentials Quotations Envelope sensibilisation pour les on décideurs et les hauts- responsables BJ-WURI - BENIN-217084-NC- RFQ / Conception, Production et multiplication de kits de communication pour la Establishing Robust and Request for Single Stage - One visibilité du Projet WURI IDA / D6100 Post Limited 16,000.00 17,645.21 Signed 2021-03-20 2021-04-07 2021-05-15 2021-05-27 2021-11-11 Inclusive fID Systems Quotations Envelope (Kakémonos, Charte graphique, Carte de visite, Autocollant, Plaquettes, Dépliants etc.) BJ-WURI - BENIN-216986-NC- RFB / Recrutement d’une agence dans le cadre des Pending Establishing Robust and Single Stage - One ateliers départementaux IDA / D6100 Post Request for Bids Open - National 161,094.00 0.00 Implementati 2021-09-06 2021-09-11 2021-10-23 2021-11-22 2021-12-27 2022-06-25 Inclusive fID Systems Envelope d'appropriation du projet par on les acteurs (Préfets, Maires, CA, CPS, ONG, etc.) BJ-WURI - BENIN-221180-NC- RFB / Edition et acquisition Pending des formulaires algorithmés Facilitating Access to Services Single Stage - One IDA / D6100 Post Request for Bids Open - National 293,364.00 0.00 Implementati 2021-09-14 2021-09-19 2021-10-31 2021-11-30 2022-01-04 2022-07-03 et des fiches de témoignages Through fID Credentials Envelope on dans le cadre de l'enregistrement massif BJ-WURI - BENIN-221184-NC- Pending RFQ / Production et édition de Strengthening the Legal and Request for Single Stage - One IDA / D6100 Post Limited 35,239.00 0.00 Implementati 2021-07-25 2021-09-19 2022-03-18 bulletins d'informations sur le Institutional Framework Quotations Envelope on système d'identification fID CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WURI - BENIN-166425-CS- Consultant CQS / Sélection d'un cabinet Strengthening the Legal and IDA / V3240 Post Qualification Limited 40,000.00 31,828.83 Completed 2020-04-24 2020-04-20 2020-05-08 2020-05-22 2020-06-07 2020-06-05 2020-07-12 2020-06-10 2021-01-08 2020-07-20 pour le recrutement du Institutional Framework Selection personnel clé de l'UGP. BJ-WURI - BENIN-166431-CS- CQS / Recrutement d'un consultant pour la rédaction Consultant des documents de gestion du Strengthening the Legal and IDA / V3240 Post Qualification Limited 16,000.00 14,567.44 Signed 2020-04-24 2020-05-11 2020-05-08 2020-06-03 2020-06-07 2020-07-08 2020-07-12 2020-07-15 2021-01-08 projet (Manuel de procédures Institutional Framework Selection administrative, financière et comptable et manuel d'exécution) BJ-WURI - BENIN-175694-CS- LCS / Sélection d'un cabinet Strengthening the Legal and Least Cost Under IDA / D6110 Post Open - National 40,000.00 12,850.20 2020-12-22 2020-06-26 2021-01-12 2021-02-25 2021-01-25 2021-03-25 2021-03-09 2021-04-24 2021-03-09 2021-05-29 2021-04-15 2021-07-03 2021-12-30 pour audit financier et Institutional Framework Selection Implementation comptable du projet WURI BJ-WURI - BENIN-175699-CS- CQS / Sélection d'une ONG Consultant Establishing Robust and pour la réalisation de l'étude IDA / D6110 Post Qualification Limited 16,000.00 0.00 Under Review 2020-06-30 2020-06-26 2020-07-14 2020-08-13 2020-09-17 2021-03-16 Inclusive fID Systems sur l'évaluation sociale , Selection environnementale et genre BJ-WURI - BENIN-189679-CS- QCBS / Recrutement d’un cabinet pour une étude portant sur l’amélioration du Strengthening the Legal and Quality And Cost- Under IDA / D6100 Post Open - International 500,000.00 0.00 2020-09-30 2020-09-29 2020-10-21 2021-05-25 2020-12-04 2021-01-01 2021-01-31 2021-03-07 2021-04-11 2022-04-11 cadre juridique et Institutional Framework Based Selection Implementation institutionnelle de l’identification numérique et l’accès aux services WURI BJ-WURI - BENIN-189690-CS- QCBS / Sélection de cabinet pour les services de conseil pour développement de stratégie, conception Establishing Robust and Quality And Cost- Under organisationnelle et IDA / D6100 Post Open - International 1,500,000.00 0.00 2020-10-15 2020-11-09 2020-11-05 2020-12-16 2020-12-19 2021-01-16 2021-02-15 2021-03-22 2021-04-26 2022-04-26 Inclusive fID Systems Based Selection Implementation architecture technique, l’acquisition de services informatiques et l’appui à la gestion de projet pour la mise en œuvre du système fID BJ-WURI - BENIN-196980-CS- CQS / RECRUTEMENT D’UN CABINET POUR Consultant L’ELABORATION DU PLAN Strengthening the Legal and IDA / D6100 Post Qualification Limited 60,000.00 55,229.69 Signed 2020-10-12 2020-10-15 2020-10-26 2021-01-13 2020-11-25 2021-02-22 2020-12-30 2021-03-09 2021-06-28 STRATEGIQUE DE Institutional Framework Selection COMMUNICATION ET DE MOBILISATION SOCIALE DU PROGRAMME WURI-BENIN BJ-WURI - BENIN-217095-CS- CQS / Création d'une Consultant Establishing Robust and plateforme Web de gestion IDA / D6100 Post Qualification Limited 70,479.00 0.00 Under Review 2021-07-19 2021-06-22 2021-08-02 2021-09-01 2021-10-06 2022-04-04 Inclusive fID Systems des Plaintes et Recours au Selection profit de l'ANIP Page 3 BJ-WURI - BENIN-217124-CS- CQS / Recrutement d'un consultant pour la formation Consultant Facilitating Access to Services Pending des magistrats et des agents IDA / D6100 Post Qualification Limited 41,952.00 0.00 2021-07-19 2021-08-02 2021-09-01 2021-10-06 2022-04-04 Through fID Credentials Implementation de force de l’ordre en Selection cybercriminalité et en nouvelles technologies BJ-WURI - BENIN-217244-CS- CQS / Recrutement d'un Consultant Facilitating Access to Services Pending consultant pour la réalisation IDA / D6100 Post Qualification Limited 41,952.00 0.00 2021-05-17 2021-05-31 2021-06-30 2021-08-04 2022-01-31 Through fID Credentials Implementation de l'audit des infrastructures Selection critiques BJ-WURI - BENIN-217295-CS- CQS / Recrutement d'un Consultant consultant dans le cadre de la Facilitating Access to Services Pending IDA / D6100 Post Qualification Limited 33,561.00 0.00 2021-11-30 2021-12-14 2022-01-13 2022-02-17 2022-08-16 définition un référentiel de Through fID Credentials Implementation Selection sécurité pour la protection des services en ligne BJ-WURI - BENIN-217307-CS- LCS / Recrutement d'un Cabinet pour une étude Strengthening the Legal and Least Cost Pending IDA / D6100 Post Open - National 167,806.00 0.00 2021-08-20 2021-09-10 2021-10-24 2021-11-21 2021-12-21 2022-01-25 2022-03-01 2022-08-28 portant sur la sécurité Institutional Framework Selection Implementation foncière des propriétaires à partir de l'attestation fID BJ-WURI - BENIN-217331-CS- CQS / Recrutement d'un consultant pour la réalisation Consultant d'un sondage d'opinion sur la Strengthening the Legal and Pending IDA / D6100 Post Qualification Limited 58,732.00 0.00 2021-11-26 2021-12-10 2022-01-09 2022-02-13 2022-08-12 mise en œuvre du Projet WURI Institutional Framework Implementation Selection au Bénin (Enrôlement, Accès à l'attestation fID, Accès aux services) BJ-WURI - BENIN-217334-CS- CQS / Recrutement d'un Consultant Cabinet pour une étude Strengthening the Legal and Pending IDA / D6100 Post Qualification Limited 83,903.00 0.00 2021-12-06 2021-12-20 2022-01-19 2022-02-23 2022-08-22 portant sur le soutien à Institutional Framework Implementation Selection l'innovation et à la recherche sur l'identification de base BJ-WURI - BENIN-168604-CS- NPO / Recrutement d'un consultant pour la réalisation Establishing Robust and Non-Profit IDA / V3240 Post Open - National 16,000.00 0.00 Canceled 2020-06-19 2020-07-10 2020-08-23 2020-09-22 2020-10-27 2021-04-25 de l'étude sur l’évaluation Inclusive fID Systems Organizations environnementale, l'intégration sociale et genre BJ-WURI - BENIN-217379-CS- CQS / Recrutement d'un Consultant consultant pour la réalisation Establishing Robust and Under IDA / D6100 Post Qualification Limited 41,952.00 0.00 2021-03-22 2021-03-01 2021-04-05 2021-05-05 2021-06-09 2021-12-06 de l'étude sur l’évaluation Inclusive fID Systems Implementation Selection environnementale, l'intégration sociale et genre BJ-WURI - BENIN-217624-CS- CQS / Recrutement d'un consultant pour le Consultant développement de la plate Facilitating Access to Services Pending IDA / D6100 Post Qualification Limited 25,171.00 0.00 2021-09-20 2021-10-04 2021-11-03 2021-12-08 2022-06-06 forme Rapid Pro pour la Through fID Credentials Implementation Selection déclaration des naissance par SMS dans les nouveaux départements INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WURI - BENIN-168588-CS- Individual INDV / Recrutement du Strengthening the Legal and Pending IDA / V3240 Post Consultant Open 72,362.00 0.00 2020-04-30 2020-06-18 2020-07-09 2020-08-13 2021-02-09 Coordonnateur National WURI Institutional Framework Implementation Selection Bénin BJ-WURI - BENIN-168591-CS- Individual INDV / Recrutement du Establishing Robust and Pending IDA / V3240 Post Consultant Open 54,000.00 0.00 2020-05-29 2020-07-17 2020-08-07 2020-09-11 2021-03-10 Responsable Technique Inclusive fID Systems Implementation Selection chargé des opérations BJ-WURI - BENIN-168596-CS- Individual INDV / Recrutement d'un Strengthening the Legal and Pending IDA / V3240 Post Consultant Open 54,000.00 0.00 2020-05-29 2020-07-17 2020-08-07 2020-09-11 2021-03-10 responsable administratif et Institutional Framework Implementation Selection financier BJ-WURI - BENIN-168597-CS- Individual INDV / Recrutement d'un Strengthening the Legal and Pending IDA / V3240 Post Consultant Open 54,000.00 0.00 2020-05-29 2020-07-17 2020-08-07 2020-09-11 2021-03-10 spécialiste en passation des Institutional Framework Implementation Selection marchés BJ-WURI - BENIN-168598-CS- Individual Establishing Robust and Pending INDV / Recrutement d'un IDA / V3240 Post Consultant Open 54,000.00 0.00 2020-05-29 2020-07-17 2020-08-07 2020-09-11 2021-03-10 Inclusive fID Systems Implementation Spécialiste Suivi-Evaluation Selection BJ-WURI - BENIN-168600-CS- Individual INDV / Recrutement d'un Strengthening the Legal and Pending IDA / V3240 Post Consultant Open 54,000.00 0.00 2020-05-29 2020-07-17 2020-08-07 2020-09-11 2021-03-10 Responsable Chargé du Institutional Framework Implementation Selection Partenariat BJ-WURI - BENIN-168601-CS- Individual INDV / Recrutement d'un Strengthening the Legal and Under IDA / V3240 Post Consultant Open 54,000.00 0.00 2020-05-29 2020-04-23 2020-07-17 2020-08-07 2020-09-11 2021-03-10 spécialiste en développement Institutional Framework Implementation Selection social BJ-WURI - BENIN-168602-CS- Individual Strengthening the Legal and Under INDV / Recrutement d'un IDA / V3240 Post Consultant Open 54,000.00 0.00 2020-05-29 2020-04-23 2020-07-17 2020-08-07 2020-09-11 2021-03-10 Institutional Framework Implementation spécialiste en communication Selection Page 4 BJ-WURI - BENIN-175678-CS- INDV / Recrutement d'un ou Individual Strengthening the Legal and Under d'une comptable pour l'Unité IDA / D6110 Post Consultant Open 14,000.00 0.00 2020-06-30 2020-06-26 2020-08-18 2020-09-08 2020-10-13 2021-04-11 Institutional Framework Implementation de Gestion du Projet Selection conformement au PGMO. BJ-WURI - BENIN-187353-CS- INDV / Sélection d'un Individual Establishing Robust and consultant individuel pour IDA / D6100 Post Consultant Limited 10,000.00 12,047.81 Signed 2020-08-28 2020-10-22 2020-09-02 2020-10-26 2020-09-23 2021-02-15 2020-10-28 2021-02-18 2021-04-26 Inclusive fID Systems l'élaboration du mécanisme de Selection gestion de plaintes BJ-WURI - BENIN-203061-CS- CDS / Sélection d’un consultant pour le Establishing Robust and IDA / D6100 Post Direct Selection Direct 16,445.00 17,576.74 Completed 2020-11-06 2020-11-16 2020-11-16 2020-11-25 2021-01-20 2020-12-23 2021-07-19 2021-03-23 développement d'un système Inclusive fID Systems de S&E, Gestion des plaintes et des RH BJ-WURI - BENIN-203063-CS- CDS / Sélection d’un consultant pour la mise en Establishing Robust and œuvre d'une stratégie de IDA / D6100 Post Direct Selection Direct 50,342.00 43,191.55 Completed 2020-11-08 2020-11-16 2020-11-13 2020-12-17 2021-01-17 2021-02-19 2021-07-16 2021-04-08 Inclusive fID Systems communication autour de l'opération de recensement ARCH BJ-WURI - BENIN-217336-CS- INDV / Recrutement d'un Individual consultant pour la production Establishing Robust and Pending IDA / D6100 Post Consultant Limited 8,391.00 0.00 2021-03-08 2021-03-13 2021-04-03 2021-05-08 2021-11-04 d'une capsule vidéo à l'appui Inclusive fID Systems Implementation Selection de la valorisation du 2ème "Prix WURI Afrique de l'Ouest". BJ-WURI - BENIN-217375-CS- Individual INDV / Recrutement d'un Establishing Robust and Under IDA / D6100 Post Consultant Limited 17,590.00 0.00 2021-02-26 2021-03-12 2021-03-03 2021-04-27 2021-03-24 2021-04-28 2021-10-25 consultant pour la conception Inclusive fID Systems Implementation Selection du site web du projet WURI BJ-WURI - BENIN-217635-CS- INDV / Recrutement d'un consultant individuel pour Individual Facilitating Access to Services Pending l'élaboration de guide en IDA / D6100 Post Consultant Limited 20,137.00 0.00 2021-09-20 2021-09-25 2021-10-16 2021-11-20 2022-05-19 Through fID Credentials Implementation français facile sur le nouveau Selection mécanisme d'enregistrement des naissances BJ-WURI - BENIN-221183-CS- INDV / Élaboration du projet Individual Establishing Robust and Pending de décret portant IDA / D6100 Post Consultant Limited 38,000.00 0.00 2021-08-10 2021-08-15 2021-09-05 2021-10-10 2022-04-08 Inclusive fID Systems Implementation règlementation des services Selection de confiance électronique BJ-WURI - BENIN-217100-CS- INDV / Recrutement d'un Individual consultant individuel pour le Establishing Robust and Under IDA / D6100 Post Consultant Limited 16,227.00 0.00 2021-02-22 2021-03-24 2021-02-27 2021-04-06 2021-03-20 2021-04-24 2021-10-21 développement d'un système Inclusive fID Systems Implementation Selection de gestion électronique des données au sein de l'UGP BJ-WURI - BENIN-221265-CS- CDS / Sélection d'un cabinet par entente direct chargé du Establishing Robust and recrutement d'un auditeur IDA / D6100 Post Direct Selection Direct 4,200.00 5,019.41 Completed 2021-03-08 2021-03-19 2021-03-18 2021-03-25 2021-05-22 2021-04-30 2021-11-18 2021-05-28 Inclusive fID Systems interne des comptes du projet et d'un chauffeur au projet de l'UGP BJ-WURI - BENIN-221271-CS- INDV / Recrutement d'un Individual consultant individuel chargé Establishing Robust and Under IDA / D6100 Post Consultant Open 10,000.00 14,552.16 2021-03-01 2021-03-15 2021-04-19 2021-05-17 2021-05-10 2021-06-10 2021-06-14 2021-12-11 de l'audit interne périodique Inclusive fID Systems Implementation Selection des comptes du projet WURI- BENIN Page 5 PROCUREMENT PLAN (Textual Part) Project information: Bosnia and Herzegovina – Real Estate Registration Project (Additional Financing) – P128950 Project Implementation agency: Federal Administration for Geodetic and Real Property Affairs and Republic of Srpska Administration for Geodetic and Property Affairs Date of the Procurement Plan: December 22, 2020 Period covered by this Procurement Plan: January – December 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: Not applicable Works: Not applicable PROCUREMENT Bosnia and Herzegovina : REAL ESTATE REGISTRATION PROJECT PLAN General Information Country: Bosnia and Herzegovina Bank’s Approval Date of the Original Procurement Plan: 2020-06-11 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P128950 GPN Date: 2020-12-29 Project Name: REAL ESTATE REGISTRATION PROJECT Loan / Credit No: IDA / 51880, IBRD / 90480 R Executing Agency(ies): epublic Administration for Geodetic and Property Affairs WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BA-RERP-51880BA-NCB-BL- W-14-B.1.1.4.2 / Component A - Real Estate Rehabilitation work of new Single Stage - One IDA / 51880 Registration Data Prior Request for Bids Open - National 0.00 101,335.47 Signed 2015-02-26 2015-03-02 premises Branch offices in Envelope Development Istocno Novo Sarajevo & Srebrenica GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BA-RERP-5188BA-FBiH-G- ICB-15-B2.1.2.2 / Component A - Real Estate Procurement of Computer Single Stage - One IDA / 51880 Registration Data Prior Request for Bids Open - International 0.00 374,274.21 Terminated 2015-03-23 2015-04-15 Equipment for Land Registry Envelope Development Offices and Cadastre Offices in the Federation B&H BA-RERP-51880BA-G-SH-14- B1.1.4.2 / Procurement of Component A - Real Estate Request for Furniture for the Land IDA / 51880 Registration Data Prior Open - International 0.00 25,350.55 Signed 2015-03-31 Quotations Registration Offices in Development Gracanica and Tesanj - BA-RERP-5188BA-FBiH-G- ICB-15-B2.1.2.2 / Component A - Real Estate Procurement of Computer Single Stage - One IDA / 51880 Registration Data Prior Request for Bids Open - International 0.00 426,745.12 Signed 2015-03-27 2015-04-15 Equipment for Land Registry Envelope Development Offices and Cadastre Offices in the Federation B&H BA-RERP-9048BA-RS-IS-RFB- 21-B.2.2.2 / Document Component B - Real Estate Under Management System (DMS)- Single Stage - One IBRD / 90480 Registration Infrastructure Post Request for Bids Open - International 450,000.00 0.00 Implementati 2021-02-18 2021-02-22 2021-02-23 2021-02-23 2021-04-06 2021-04-08 2021-04-16 2021-04-15 2021-05-15 2022-05-15 Phase II: further development, Envelope Development on interoperability with other systems and new e-services Component B - Real Estate BA-RERP-9048BA-RS-G-RFQ- Request for Single Stage - One IBRD / 90480 Registration Infrastructure Post Open - National 99,550.00 107,787.03 Completed 2021-04-01 2021-04-18 2021-05-05 2021-05-18 2021-05-21 21-B.1.2. / Vehicles Quotations Envelope Development BA-RERP-90480BA-RS-G- RFB-21-B.2.2.13 / Supply of Component B - Real Estate Pending Single Stage - One hardware and communication IBRD / 90480 Registration Infrastructure Post Request for Bids Open - National 570,000.00 0.00 Implementati 2021-04-23 2021-04-24 2021-05-15 2021-05-20 2021-06-02 2021-10-30 Envelope equipment for local offices- Development on phase I BA-RERP-90480BA-RS-G- RFB-21-B.2.2.3 / e- Katastar.rs - phase II : national roll out and further Component B - Real Estate Pending Single Stage - One development, data migration IBRD / 90480 Registration Infrastructure Post Request for Bids Open - International 400,000.00 0.00 Implementati 2021-04-16 2021-04-21 2021-06-02 2021-06-07 2021-06-22 2022-06-07 Envelope into new datamodel, extend e- Development on Katastar.rs functionalities to replace LARIS and Books of Deposited Contracts BA-RERP-90480BA-RS-G- Component B - Real Estate Pending Single Stage - One RFB-21-B.2.2.6 / Upgrading IBRD / 90480 Registration Infrastructure Post Request for Bids Open - National 140,000.00 0.00 Implementati 2021-04-23 2021-04-30 2021-05-21 2021-05-26 2021-06-10 2022-02-20 Envelope Geoportal-phase II Development on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BA-RERP-9048BA-RS-NCS- Component A - Real Estate Single Stage - One RFB-21-A.2.1 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - International 1,800,000.00 0.00 Canceled 2021-02-25 2021-03-02 2021-04-13 2021-04-23 2021-05-22 2022-06-26 Envelope field surveys-Phase 1 Development BA-RERP-9048BA-RS-NCS- Component A - Real Estate Single Stage - One RFB-21-A.2.2 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - International 1,400,000.00 0.00 Canceled 2021-02-25 2021-03-02 2021-04-13 2021-04-23 2021-05-22 2022-06-26 Envelope field surveys-phase 2 Development BA-RERP-9048BA-RS-NCS- Component A - Real Estate Under Single Stage - One RFB-21-A.2.1.1 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - National 600,000.00 0.00 Implementati 2021-04-16 2021-05-14 2021-04-17 2021-05-20 2021-05-08 2021-05-13 2021-05-28 2022-07-02 Envelope field surveys-Phase 1 Development on BA-RERP-9048BA-RS-NCS- Component A - Real Estate Under Single Stage - One RFB-21-A.2.2.1 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - National 490,000.00 0.00 Implementati 2021-04-16 2021-05-14 2021-04-17 2021-05-20 2021-05-08 2021-05-13 2021-05-28 2022-07-02 Envelope field surveys-Phase 2 Development on BA-RERP-9048BA-RS-NCS- Component A - Real Estate Under Single Stage - One RFB-21-A.2.3 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - National 370,000.00 0.00 Implementati 2021-04-16 2021-05-14 2021-04-17 2021-05-14 2021-05-08 2021-05-13 2021-05-28 2022-05-13 Envelope field surveys-Phase 3 Development on Page 1 BA-RERP-9048BA-RS-NCS- Component A - Real Estate Under Single Stage - One RFB-21-A.2.4 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - National 380,000.00 0.00 Implementati 2021-04-18 2021-05-14 2021-04-19 2021-05-20 2021-05-10 2021-05-15 2021-05-30 2022-05-15 Envelope field surveys-Phase 4 Development on BA-RERP-9048BA-RS-NCS- Component A - Real Estate Under Single Stage - One RFB-21-A.2.5 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - National 205,000.00 0.00 Implementati 2021-04-18 2021-05-14 2021-04-19 2021-05-20 2021-05-10 2021-05-15 2021-05-30 2022-05-15 Envelope field surveys-Phase 5 Development on BA-RERP-9048BA-RS-NCS- Component A - Real Estate Under Single Stage - One RFB-21-A.2.5.1 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - National 205,000.00 0.00 Implementati 2021-04-18 2021-05-14 2021-04-19 2021-05-20 2021-05-10 2021-05-15 2021-05-30 2022-07-04 Envelope field surveys-Phase 6 Development on BA-RERP-9048BA-RS-NCS- Component A - Real Estate Under Single Stage - One RFB-21-A.2.5.2 / Cadastral IBRD / 90480 Registration Data Post Request for Bids Open - National 900,000.00 0.00 Implementati 2021-04-18 2021-05-14 2021-04-19 2021-05-20 2021-05-10 2021-05-15 2021-05-30 2022-07-04 Envelope field surveys-Phase 7 Development on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BA- RERP-5188BA-FBiH-CS- Component A - Real Estate Consultant CQ-14-C3.1.1 / Customer IDA / 51880 Registration Data Prior Qualification Open - International 0.00 10,108.61 Signed 2015-03-26 2015-04-01 Satisfaction Survey, Study 1 Development Selection BA-RERP-90480BA-RS -CS- CQS-21-A.2.7 / Development of XSD Scheme for generating of GML format and uploading Component A - Real Estate Consultant Under data collected in 45 IBRD / 90480 Registration Data Post Qualification Open - National 55,000.00 0.00 2021-05-25 2021-05-26 2021-05-27 2021-06-11 2021-06-09 2021-06-11 2021-06-19 2021-06-24 2021-09-22 Implementation municipalities in the Development Selection vectorization process during 2019/20 in the cadastral system INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BA-RERP-51880BA-FBiH-CS- Component A - Real Estate Individual IC-13-C3.3.1.6 / Land IDA / 51880 Registration Data Prior Consultant Open 0.00 51,144.78 Signed 2015-08-13 2015-08-14 Administration Specialist Development Selection BA-RERP-51880-RS-CS-IC- Component A - Real Estate Individual 15-C.3.3.1.2a / Procurement IDA / 51880 Registration Data Prior Consultant Open 0.00 39,571.01 Signed 2015-12-27 2015-12-27 Specialist Development Selection BA-RERP-51880-RS-CS-IC- Component A - Real Estate Individual 18-C.3.3.1.2b / Procurement IDA / 51880 Registration Data Prior Consultant Open 0.00 25,437.79 Canceled 2018-02-01 Specialist Development Selection BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-C.3.2.1.4 / Administrative IBRD / 90480 institutional development, Post Direct Selection Direct 40,000.00 16,800.00 Signed 2020-12-29 2021-01-01 2020-12-30 2021-01-01 2021-01-01 2021-01-01 2021-12-31 Assistant at the Project and project management Implementation Unit BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-C.3.2.1.1 / Financial IBRD / 90480 institutional development, Post Direct Selection Direct 51,200.00 20,450.00 Signed 2020-12-29 2021-01-01 2020-12-30 2021-01-01 2021-01-01 2021-01-01 2021-12-31 Specialist and project management BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21- C.3.2.1.2 / Procurement IBRD / 90480 institutional development, Post Direct Selection Direct 51,200.00 18,700.00 Signed 2020-12-29 2021-01-01 2020-12-30 2021-01-01 2021-01-01 2021-01-01 2021-12-31 Specialist and project management BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-C.3.2.1.3 / Consultant for IBRD / 90480 institutional development, Post Direct Selection Direct 40,000.00 16,800.00 Signed 2020-12-30 2021-01-01 2020-12-31 2021-01-01 2021-01-01 2021-01-01 2021-12-31 social mapping and and project management monitoring BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-C.3.2.1.6 / Project and IBRD / 90480 institutional development, Post Direct Selection Direct 40,000.00 16,800.00 Terminated 2020-12-30 2021-01-01 2020-12-31 2021-01-01 2021-01-01 2021-01-01 2021-12-31 procurement assistant and project management BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-C.3.2.1.7 / Project IBRD / 90480 institutional development, Post Direct Selection Direct 40,000.00 16,800.00 Signed 2020-12-30 2021-01-01 2020-12-31 2021-01-01 2021-01-01 2021-01-01 2021-12-31 Assistant and project management Component C - Policy and BA-RERP-9048BA-RS-CS-DS- IBRD / 90480 institutional development, Post Direct Selection Direct 23,000.00 13,080.00 Signed 2020-12-30 2021-01-01 2020-12-31 2021-01-01 2021-01-01 2021-01-01 2021-12-31 21-C.3.2.1.9 / Translator and project management BA-RERP-9048BA-RS-CS-IC- Component C - Policy and Individual Under 21-C.3.2.1.10 / Contract IBRD / 90480 institutional development, Post Consultant Limited 45,000.00 0.00 2020-12-30 2021-01-01 2021-01-06 2021-01-06 2021-01-15 2021-12-30 Implementation Manager and project management Selection BA-RERP-9048BA-RS-CS-DS- 21-A.2.6 / Consultants for Component A - Real Estate preparing of REC data for IBRD / 90480 Registration Data Post Direct Selection Direct 34,130.00 17,100.00 Signed 2020-12-30 2021-01-01 2020-12-30 2021-01-01 2021-01-01 2021-01-01 2021-12-31 public presentation Development (Temporary REC database) BA-RERP-9048BA-RS-CS-DS- Component A - Real Estate 21-A.4.2 / Technical IBRD / 90480 Registration Data Post Direct Selection Direct 17,100.00 17,100.00 Signed 2020-12-30 2021-01-01 2020-12-30 2021-01-01 2021-01-01 2021-01-01 2021-12-31 assistance for cadastral Development surveys and vectorization Component B - Real Estate BA-RERP-9048BA-RS-CS-DS- IBRD / 90480 Registration Infrastructure Post Direct Selection Direct 86,000.00 16,800.00 Signed 2020-12-30 2021-01-01 2020-12-30 2021-01-01 2021-01-01 2021-01-01 2021-12-31 21- B.2.2.1 / SDI Consultants Development BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-C.3.2.1.5 / Monitoring IBRD / 90480 institutional development, Post Direct Selection Direct 51,200.00 20,450.00 Signed 2021-01-05 2021-01-01 2021-01-05 2021-01-01 2021-01-05 2021-01-01 2021-12-31 and Evaluation Consultant and project management Page 2 Component B - Real Estate BA-RERP-9048BA-RS-CS-DS- IBRD / 90480 Registration Infrastructure Post Direct Selection Direct 18,700.00 18,700.00 Signed 2021-01-13 2021-01-01 2021-01-13 2021-01-01 2021-01-13 2021-01-01 2021-12-31 21-B.2.2.1.1 / SDI Consultant Development Component B - Real Estate BA-RERP-9048BA-RS-CS-DS- IBRD / 90480 Registration Infrastructure Post Direct Selection Direct 18,700.00 18,700.00 Signed 2021-01-13 2021-01-01 2021-01-13 2021-01-01 2021-01-13 2021-01-01 2021-12-31 21-B.2.2.1.2 / SDI Consultant Development BA-RERP-9048BA-RS-CS-DS- 21-A.2.6.1 / Consultant for Component A - Real Estate preparing of REC data for IBRD / 90480 Registration Data Post Direct Selection Direct 11,000.00 17,100.00 Terminated 2021-01-13 2021-01-01 2021-01-13 2021-01-01 2021-01-13 2021-01-01 2021-12-31 public presentation Development (Temporary REC database) BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.1 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-08 2021-01-18 2021-01-08 2021-01-18 2021-02-01 2021-02-01 2021-07-31 consultants for Digital Archive and project management 1 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.2 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 2 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.3 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 3 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.4 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 5,600.00 5,600.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 4 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.5 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 5 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.6 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 6 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.7 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 5,600.00 5,600.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 7 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.8 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 8 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.9 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 9 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.10 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 10 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.11 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 11 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.12 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Terminated 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 12 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.13 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Terminated 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 13 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.14 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 14 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.15 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 15 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.16 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 16 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.17 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 5,600.00 5,600.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 17 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.19 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 19 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.20 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 20 Page 3 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.21 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 21 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.22 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 22 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.23 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 23 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.24 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 24 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.25 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 25 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.26 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 26 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.27 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 27 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.28 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 28 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.29 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 2,850.00 2,850.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 29 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.30 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 30 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.31 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 31 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.32 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 32 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.33 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 33 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.18 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-01-18 2021-01-18 2021-01-19 2021-01-19 2021-01-25 2021-02-01 2021-07-25 consultant for Digital Archive and project management 18 BA-RERP-9048BA-RS-CS-ICS- Component C - Policy and Individual 21-C.3.2.1.6.1 / Project and IBRD / 90480 institutional development, Post Consultant Limited 40,000.00 7,000.00 Signed 2021-02-08 2021-02-10 2021-02-11 2021-02-12 2021-02-21 2021-02-22 2021-03-01 2021-03-01 2021-12-31 Procurement Assistant and project management Selection BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.34 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-02 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 34 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.35 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-02 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 35 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.36 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-02 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 36 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.37 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-02 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 37 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.38 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-02 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 38 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.39 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-02 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 39 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.40 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-02 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 40 Page 4 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.41 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 41 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.42 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 42 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.43 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 43 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.44 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 44 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.45 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 45 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.46 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 46 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.47 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 47 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.48 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 48 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.49 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 49 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.50 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 50 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.51 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 51 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.52 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 52 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.53 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 53 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.54 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 54 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.55 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 55 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.56 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 56 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.57 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 57 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.58 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 58 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.59 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 59 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.60 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 60 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.61 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 61 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.62 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 62 Page 5 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.63 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-03-31 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 63 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.64 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 64 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.65 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 65 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.66 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 66 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.67 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 67 BA-RERP-9048BA-RS-CS-DS- Component C - Policy and 21-B.3.2.68 / Individual IBRD / 90480 institutional development, Post Direct Selection Direct 4,700.00 4,700.00 Signed 2021-03-11 2021-03-30 2021-03-12 2021-04-01 2021-03-15 2021-04-01 2021-09-15 consultant for Digital Archive and project management 68 Page 6 PROCUREMENT PLAN (Textual Part) Project information: P173776 Moldova Emergency COVID-19 Project Project Implementation agency: Ministry of Health, Labor and Social Protection Date of the Procurement Plan: May 21, 2020 Period covered by this Procurement Plan: June 2020 – April 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the arrangements agreed shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information: Fast-Track Procurement. The proposed procurement approach prioritizes fast-track emergency procurement for the urgently required goods, works and services. Key measures to fast-track procurement include certain flexibilities related to bid and performance securities, advance payment, time for submission of bids/proposals; and standstill period. PROCUREMENT Moldova : Moldova Emergency COVID-19 Response Project PLAN General Information Country: Moldova Bank’s Approval Date of the Original Procurement Plan: 2020-05-29 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173776 GPN Date: 2020-06-17 Project Name: Moldova Emergency COVID-19 Response Project Loan / Credit No: IDA / 66320 M Executing Agency(ies): inistry of Health, Labor and Social Protection WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MD-MHLSP-174714-CW-RFQ Pending Emergency COVID-19 Request for Single Stage - One 2021-03- / Refurbishment of ICUs (19 IDA / 66320 Post Open - National 400,000.00 0.00 Implementat 2020-07-20 2020-09-14 Response Quotations Envelope 13 hospitals) ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-MHLSP-174636-GO-DIR Pending Emergency COVID-19 / Procurement of Equipment IDA / 66320 Post Direct Selection Direct 45,900.00 0.00 Implementati 2020-06-30 2020-07-05 2020-08-09 2021-02-05 Response for infection diseases Units on MD-MHLSP-174639-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 1,920,000.00 1,920,000.00 Signed 2020-06-30 2020-04-03 2020-07-05 2020-04-04 2020-08-09 2020-04-04 2021-02-05 / Procurement of testing kits Response MD-MHLSP-174640-GO-RFQ / Procurement of 4 vehicles Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 80,000.00 74,870.18 Signed 2020-06-21 2020-08-16 2020-07-08 2021-02-12 for Transportation of samples Response Quotations Envelope from regions MD-MHLSP-174642-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 187,920.00 190,257.45 Signed 2020-06-15 2020-04-01 2020-06-20 2020-04-01 2020-07-25 2020-04-02 2021-01-21 / Procurement of PPE (gowns) Response MD-MHLSP-174643-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 50,000.00 30,822.76 Signed 2020-06-15 2020-03-19 2020-06-20 2020-03-19 2020-07-25 2020-03-19 2021-01-21 / Procurement of PPE (Masks) Response MD-MHLSP-174644-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 30,050.00 51,319.65 Signed 2020-06-15 2020-03-23 2020-06-20 2020-03-23 2020-07-25 2020-03-23 2021-01-21 / Procurement of PPE (gloves) Response MD-MHLSP-174705-GO-DIR Emergency COVID-19 / Procurement of PPE IDA / 66320 Post Direct Selection Direct 2,058,750.00 1,827,837.77 Signed 2020-06-15 2020-04-22 2020-06-20 2020-04-22 2020-07-25 2020-03-27 2021-01-21 Response (faceshield and respirators) Pending MD-MHLSP-174706-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 235,000.00 0.00 Implementati 2020-07-13 2020-07-18 2020-08-22 2021-02-18 / Procurement of Drugs Response on MD-MHLSP-174709-GO-RFQ Pending Emergency COVID-19 Request for Single Stage - One / Procurement of bags for IDA / 66320 Post Open - International 12,000.00 0.00 Implementati 2020-07-18 2020-09-12 2021-03-11 Response Quotations Envelope medical waste on MD-MHLSP-174711-GO-UN / Procurement of equipment Emergency COVID-19 UN Agencies from UNICEF IDA / 66320 Post Direct 550,000.00 0.00 Canceled 2020-06-07 2020-06-12 2020-07-17 2021-01-13 Response (Direct) (oxygenconcentrators, syringe pump etc.) MD-MHLSP-174712-GO-DIR Emergency COVID-19 / Procurement of Pulse IDA / 66320 Post Direct Selection Direct 37,500.00 249,000.00 Signed 2020-06-10 2020-04-15 2020-06-15 2020-04-04 2020-07-20 2020-07-17 2021-01-16 Response Oximeters (150 units) MD-MHLSP-174713-GO-DIR Emergency COVID-19 / Procurement of IDA / 66320 Post Direct Selection Direct 90,510.00 97,750.80 Signed 2020-06-07 2020-05-05 2020-06-12 2020-05-05 2020-07-17 2020-07-28 2021-01-13 Response electrocardiographs (42 units) MD-MHLSP-174717-GO-DIR Under Emergency COVID-19 / Procurement of 8 IDA / 66320 Post Direct Selection Direct 960,000.00 0.00 Implementati 2020-06-15 2020-07-14 2020-06-20 2020-07-27 2020-07-25 2021-01-21 Response Ambulances (type C 4x4) on MD-MHLSP-174641-GO-DIR / Infection protection supplies Pending Emergency COVID-19 for hospital staff and PHC IDA / 66320 Prior Direct Selection Direct 7,985,000.00 0.00 Implementati 2020-06-30 2020-07-05 2020-08-09 2021-02-05 Response staff (PPE equipment) (several on contracts) MD-MHLSP-179833-GO-DIR Emergency COVID-19 / Procurement of protective IDA / 66320 Post Direct Selection Direct 700,000.00 596,013.72 Signed 2020-06-13 2020-06-12 2020-06-13 2020-06-12 2020-06-17 2020-06-16 2020-07-08 Response suits MD-MHLSP-179534-GO-RFB Pending Emergency COVID-19 Single Stage - One / Equipment for ICU Units (6 IDA / 66320 Prior Request for Bids Open - National 11,575,000.00 0.00 Implementati 2020-06-25 2020-06-30 2020-07-14 2020-07-24 2020-08-10 2021-02-06 Response Envelope contracts) on MD-MHLSP-174707-GO-DIR Pending / Procurement of medical Emergency COVID-19 IDA / 66320 Prior Direct Selection Direct 6,980,000.00 0.00 Implementati 2020-07-14 2020-07-19 2020-08-23 2021-02-19 accessories and consumables Response on (several contracts) MD-MHLSP-179828-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 3,000,000.00 0.00 Canceled 2020-06-13 2020-06-12 2020-06-13 2020-06-14 2020-06-17 2020-07-09 / Procurement of testing kits Response MD-MHLSP-179452-GO-RFQ Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 45,000.00 0.00 Canceled 2020-06-16 2020-07-03 2020-08-02 / Procurement of gowns Response Quotations Envelope Page 1 MD-MHLSP-179526-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 375,000.00 735,781.00 Signed 2020-06-15 2020-06-25 2020-06-20 2020-06-19 2020-07-25 2020-07-15 2020-10-23 / Procurement of ICU Beds Response Pending MD-MHLSP-179529-GO-RFQ Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 300,000.00 0.00 Implementati 2020-06-28 2020-07-29 2020-10-27 / Procurement of googles Response Quotations Envelope on MD-MHLSP-181657-GO-RFQ / Procurement of Reagents for Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - International 1,000,000.00 1,113,868.60 Signed 2020-06-24 2020-08-10 2020-07-02 2020-09-09 laboratory diagnosis of COVID- Response Quotations Envelope 19 infection MD-MHLSP-181659-GO-RFQ / Procurement of Supplies for Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - International 1,000,000.00 0.00 Canceled 2020-06-24 2020-08-10 2020-09-09 laboratory diagnosis of COVID- Response Quotations Envelope 19 infection MD-MHLSP-181665-GO-RFQ / Procurement of Medical Under Emergency COVID-19 Request for Single Stage - One Devices for laboratory IDA / 66320 Post Open - International 1,000,000.00 0.00 Implementati 2020-06-24 2020-08-10 2020-09-09 Response Quotations Envelope diagnosis of COVID-19 on infection MD-MHLSP-179452-GO-RFQ- Emergency COVID-19 Request for Single Stage - One 2 / Procurement of PPE IDA / 66320 Post Open - National 45,000.00 231,944.46 Signed 2020-07-01 2020-07-17 2020-07-22 2020-08-16 Response Quotations Envelope (surgical gowns) MD-MHLSP-182629-GO-RFB Emergency COVID-19 Single Stage - One IDA / 66320 Post Request for Bids Open - International 7,500,000.00 0.00 Canceled 2020-07-07 2020-07-15 2020-07-08 2020-07-16 2020-07-29 2020-08-03 2020-08-23 2021-02-19 / Procurement of Ventilators Response Envelope MD-MHLSP-182648-GO-RFQ Emergency COVID-19 Request for Single Stage - One / Procurement of laproscopic IDA / 66320 Post Open - National 350,000.00 0.00 Canceled 2020-07-04 2020-08-05 2021-02-01 Response Quotations Envelope trolley MD-MHLSP-181659-GO-RFQ- Pending 2 / Procurement of Supplies Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 1,000,000.00 0.00 Implementati 2020-07-22 2020-09-16 2020-10-16 for laboratory diagnosis of Response Quotations Envelope on COVID-19 infection MD-MHLSP-186131-GO-RFQ / Procurement of Reagents for Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 1,000,000.00 0.00 Canceled 2020-07-31 2020-08-12 2020-09-11 laboratory diagnosis of COVID- Response Quotations Envelope 19 infection MD-MHLSP-186133-GO-DIR Under / Personal Protective Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 750,000.00 0.00 Implementati 2020-07-30 2020-08-04 2020-07-31 2020-08-10 2020-09-09 Equipment (Suits with boots Response on and hood) MD-MHLSP-182629-GO-RFB- Under Emergency COVID-19 Single Stage - One 2 / Procurement of ICU IDA / 66320 Post Request for Bids Open - International 7,500,000.00 0.00 Implementati 2020-08-18 2020-08-31 2020-08-19 2020-08-31 2020-09-17 2020-09-30 2020-09-24 2020-10-14 2021-04-12 Response Envelope Ventilators on MD-MHLSP-189167-GO-DIR Pending Emergency COVID-19 / Procurement of Biosys IDA / 66320 Post Direct Selection Direct 900,000.00 0.00 Implementati 2020-08-18 2020-08-18 2020-08-25 2020-10-24 Response Ventilators (50 units) on MD-MHLSP-189168-GO-DIR Pending / Procurement of Supplies for Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 5,000.00 0.00 Implementati 2020-08-18 2020-08-19 2020-08-24 2020-09-14 laboratory diagnosis of COVID- Response on 19 infection (ependorf tubes) MD-MHLSP-182648-GO-RFQ- Pending Emergency COVID-19 Request for Single Stage - One 2 / Procurement of IDA / 66320 Post Open - National 350,000.00 0.00 Implementati 2020-08-21 2020-09-10 2020-10-25 Response Quotations Envelope laproscopic trolley on MD-MHLSP-189175-GO-DIR Pending Emergency COVID-19 / Procurement of Syringe IDA / 66320 Post Direct Selection Direct 300,000.00 0.00 Implementati 2020-08-19 2020-08-20 2020-08-24 2020-10-08 Response Pumps (300 units) on MD-MHLSP-174637-GO-DIR Pending Emergency COVID-19 / Procurement of Patient IDA / 66320 Post Direct Selection Direct 180,000.00 0.00 Implementati 2020-06-30 2020-07-05 2020-08-09 2021-02-05 Response monitors (200 units) on MD-MHLSP-190458-GO-DIR / Procurement of motorized Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 1,500,000.00 1,486,972.50 Signed 2020-08-28 2020-09-01 2020-08-28 2020-09-03 2020-09-06 2020-11-16 2020-10-06 digital mobile x-ray unit (25 Response units) MD-MHLSP-192538-GO-DIR Pending Emergency COVID-19 / Procurement of ICU IDA / 66320 Post Direct Selection Direct 450,000.00 0.00 Implementati 2020-09-09 2020-09-10 2020-09-13 2020-09-23 Response Ventilators (15 units) on MD-MHLSP-192542-GO-DIR Under Emergency COVID-19 / Procurement of ICU IDA / 66320 Post Direct Selection Direct 40,000.00 35,265.99 Implementati 2020-09-09 2020-09-08 2020-09-10 2020-09-09 2020-09-13 2020-09-23 Response Ventilators (2 units) on MD-MHLSP-186131-GO-RFQ- 2 / Procurement of Reagents Emergency COVID-19 Request for Single Stage - One for laboratory diagnosis of IDA / 66320 Post Open - National 1,000,000.00 755,244.00 Signed 2020-09-15 2020-09-29 2020-10-07 2020-10-29 Response Quotations Envelope COVID-19 infection (100 000 tests) MD-MHLSP-196253-GO-RFQ Emergency COVID-19 Request for Single Stage - One / Procurement of Goods IDA / 66320 Post Open - National 300,000.00 238,000.00 Signed 2020-10-01 2020-10-26 2020-10-23 2020-12-30 Response Quotations Envelope (Oxygen Concentrators) MD-MHLSP-196256-GO-DIR Pending Emergency COVID-19 / Procurement of Medical IDA / 66320 Post Direct Selection Direct 350,000.00 0.00 Implementati 2020-09-28 2020-09-28 2020-10-01 2020-10-22 Response Equipment (Syringe Pumps) on MD-MHLSP-200339-GO-DIR Pending Emergency COVID-19 / Procurement of medical IDA / 66320 Post Direct Selection Direct 320,000.00 0.00 Implementati 2020-10-19 2020-10-19 2020-10-22 2020-11-12 Response equipment (syringe pumps) on MD-MHLSP-200340-GO-DIR Pending Emergency COVID-19 / Procurement of medical IDA / 66320 Post Direct Selection Direct 200,000.00 0.00 Implementati 2020-10-19 2020-10-19 2020-10-24 2020-11-14 Response equipment (patient monitors) on Page 2 MD-MHLSP-200341-GO-DIR Under Emergency COVID-19 / Procurement of Personal IDA / 66320 Post Direct Selection Direct 350,000.00 0.00 Implementati 2020-10-19 2020-10-12 2020-10-19 2020-10-26 2020-11-16 Response Protective Equipment on MD-MHLSP-200343-GO-DIR / Procurement of medical Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 300,000.00 246,703.51 Signed 2020-10-19 2020-09-10 2020-10-19 2020-10-19 2020-10-26 2020-10-22 2020-11-16 equipment for laboratory Response testing MD-MHLSP-200352-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 1,000,000.00 0.00 Canceled 2020-10-20 2020-10-21 2020-11-09 2021-05-08 / Procurement of Ag tests Response MD-MHLSP-200355-GO-RFQ Pending / Procurement of Supplies for Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 500,000.00 0.00 Implementati 2020-10-22 2020-11-08 2020-12-08 laboratory diagnosis of COVID- Response Quotations Envelope on 19 infection MD-MHLSP-200356-GO-DIR Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 450,000.00 557,340.00 Signed 2020-10-21 2020-10-12 2020-10-26 2020-10-27 2020-11-12 2020-11-11 2021-02-10 / Procurement of ICU Beds Response MD-MHLSP-201018-GO-DIR Emergency COVID-19 / Procurement of Mobile X- IDA / 66320 Post Direct Selection Direct 300,000.00 250,542.31 Signed 2020-11-04 2020-10-15 2020-11-04 2020-10-22 2020-11-10 2020-10-27 2020-12-05 Response Ray MD-MHLSP-202803-GO-DIR Emergency COVID-19 / Procurement of medical IDA / 66320 Post Direct Selection Direct 400,000.00 383,373.90 Signed 2020-11-04 2020-11-03 2020-11-06 2020-12-11 2020-11-19 2020-12-22 2020-12-19 Response equipment (ECMO machine) MD-MHLSP-206441-GO-RFQ Pending Emergency COVID-19 Request for Single Stage - One / Supplies for isolation of viral IDA / 66320 Post Open - National 400,000.00 0.00 Implementati 2020-11-27 2021-01-15 2021-02-14 Response Quotations Envelope nucleic acids and RT-PCR on MD-MHLSP-206443-GO-RFQ Pending / Real Time PCR Detection kits Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 1,000,000.00 0.00 Implementati 2020-11-27 2021-01-15 2021-07-14 (compatible with 7500 Real Response Quotations Envelope on Time PCR System) MD-MHLSP-206444-GO-RFQ Pending / Real Time PCR Detection kits Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 500,000.00 0.00 Implementati 2020-11-27 2021-01-15 2021-07-14 (compatible with Rotor Gene Response Quotations Envelope on (Q, 6000) MD-MHLSP-206453-GO-RFQ / COVID-19 sample collection Pending Emergency COVID-19 Request for Single Stage - One and transport kits (Sampling IDA / 66320 Post Open - National 650,000.00 0.00 Implementati 2020-11-27 2021-01-15 2021-03-16 Response Quotations Envelope kit with virus transport on medium (VTM)) MD-MHLSP-206465-GO-DIR / Extraction kits for Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 900,000.00 0.00 Canceled 2020-11-26 2021-01-20 2020-11-27 2020-12-04 2021-06-02 automated purification of viral Response nucleic acids MD-MHLSP-206457-GO-RFQ Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 350,000.00 0.00 Canceled 2020-11-27 2021-01-15 2021-03-16 / Nucleic acid extraction kit Response Quotations Envelope MD-MHLSP-206462-GO-DIR Emergency COVID-19 / Procurement of ICU IDA / 66320 Post Direct Selection Direct 450,000.00 401,041.01 Signed 2020-11-27 2020-11-09 2020-11-27 2020-11-25 2020-11-30 2020-11-26 2020-12-20 Response ventilators MD-MHLSP-210734-GO-RFQ Pending Emergency COVID-19 Request for Single Stage - One / Procurement of Ag tests IDA / 66320 Post Open - International 2,000,000.00 0.00 Implementati 2020-12-21 2021-02-06 2021-03-08 Response Quotations Envelope (300 000 tests) on MD-MHLSP-212230-GO-DIR Emergency COVID-19 / Procurement of Mobile X- IDA / 66320 Post Direct Selection Direct 700,000.00 972,826.08 Signed 2021-01-06 2021-01-12 2021-01-06 2021-01-12 2021-01-12 2021-01-25 2021-03-13 Response Ray for PHCs (15 units) MD-MHLSP-212232-GO-DIR Emergency COVID-19 / Procurement of Oxygen IDA / 66320 Post Direct Selection Direct 800,000.00 1,337,505.00 Signed 2021-01-06 2020-12-24 2021-01-11 2021-01-14 2021-02-15 2021-01-26 2021-05-16 Response Generators (4 units) MD-MHLSP-212234-GO-DIR Emergency COVID-19 / Procurement of Oxygen IDA / 66320 Post Direct Selection Direct 1,400,000.00 1,279,740.04 Signed 2021-01-06 2020-12-24 2021-01-11 2021-01-14 2021-02-15 2021-01-27 2021-05-16 Response generators (13 units) MD-MHLSP-212239-GO-DIR Emergency COVID-19 / Procurement of Angiography IDA / 66320 Post Direct Selection Direct 160,000.00 124,427.23 Signed 2021-01-06 2020-12-28 2021-01-11 2021-01-21 2021-02-15 2021-01-25 2021-05-16 Response tube MD-MHLSP-206457-GO-RFQ- Emergency COVID-19 Request for Single Stage - One 2 / Procurement of Nucleic IDA / 66320 Post Open - National 350,000.00 0.00 Canceled 2020-12-21 2021-02-08 2021-03-10 Response Quotations Envelope acid extraction kits MD-MHLSP-216926-GO-DIR Emergency COVID-19 / Procurement of Nucleic acid IDA / 66320 Post Direct Selection Direct 350,000.00 100,044.88 Signed 2021-02-08 2021-01-20 2021-02-13 2021-02-10 2021-03-20 2021-02-17 2021-05-04 Response extraction kits MD-MHLSP-216927-GO-DIR Emergency COVID-19 / Procurement of syringes for IDA / 66320 Post Direct Selection Direct 50,000.00 35,577.72 Signed 2021-02-09 2021-01-29 2021-02-14 2021-02-10 2021-03-21 2021-02-25 2021-05-05 Response vaccination MD-MHLSP-222258-GO-DIR Emergency COVID-19 / Procurement of high voltage IDA / 66320 Post Direct Selection Direct 7,000.00 7,651.48 Signed 2021-03-09 2021-02-18 2021-03-14 2021-03-04 2021-04-18 2021-03-23 2021-05-13 Response condenser MD-MHLSP-206458-GO-RFQ / Procurement of equipment Under Emergency COVID-19 Request for Single Stage - One for PCR laboratories IDA / 66320 Post Open - National 140,000.00 0.00 Implementati 2020-11-27 2021-01-15 2021-07-14 Response Quotations Envelope (equipment required for on insurance biosecurity in PCR) MD-MHLSP-229947-GO-RFQ Under / Procurement of equipment Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 130,000.00 0.00 Implementati 2021-04-25 2021-06-20 2021-08-19 required for nucleic acid Response Quotations Envelope on extraction Page 3 MD-MHLSP-229948-GO-RFQ Under Emergency COVID-19 Request for Single Stage - One / Procurement of PCR IDA / 66320 Post Open - National 160,000.00 0.00 Implementati 2021-04-25 2021-06-20 2021-08-19 Response Quotations Envelope instruments on MD-MHLSP-229950-GO-RFQ Under Emergency COVID-19 Request for Single Stage - One / Procurement of Equipment IDA / 66320 Post Open - National 1,000,000.00 0.00 Implementati 2021-04-25 2021-06-20 2021-08-19 Response Quotations Envelope for automatic extraction on MD-MHLSP-229952-GO-RFQ Under / Procurement of Reagents Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 1,700,000.00 0.00 Implementati 2021-04-20 2021-05-04 2021-07-03 (SARS-CoV-2 virus isolation Response Quotations Envelope on and detection kits) MD-MHLSP-229953-GO-RFQ Under Emergency COVID-19 Request for Single Stage - One / Procurement of PCR IDA / 66320 Post Open - National 155,000.00 0.00 Implementati 2021-04-20 2021-05-04 2021-07-03 Response Quotations Envelope consumables on MD-MHLSP-238922-GO-RFQ Pending Emergency COVID-19 Request for Single Stage - One / Procurement of IDA / 66320 Post Open - National 360,000.00 0.00 Implementati 2021-06-11 2021-06-28 2021-07-10 Response Quotations Envelope Disinfectants on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-MHLSP-174720-NC-RFQ / TV and radio sessions and Pending Emergency COVID-19 Request for Single Stage - One development of IDA / 66320 Post Open - National 35,000.00 0.00 Implementati 2020-06-21 2020-08-16 2021-02-12 Response Quotations Envelope materials/video and audio on spots Pending MD-MHLSP-174722-NC-RFQ Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 100,000.00 0.00 Implementati 2020-07-26 2020-09-20 2021-03-19 / SMS messaging Response Quotations Envelope on MD-MHLSP-179399-NC-RFQ Pending / Printing materials on Emergency COVID-19 Request for Single Stage - One IDA / 66320 Post Open - National 50,000.00 0.00 Implementati 2020-07-03 2020-07-17 2020-08-16 prevention and control of Response Quotations Envelope on COVIS-19 MD-MHLSP-185484-NC-RFQ / Development of Emergency COVID-19 Request for Single Stage - One communication materials to IDA / 66320 Post Open - National 8,000.00 0.00 Canceled 2020-07-26 2020-08-06 2020-10-05 Response Quotations Envelope combat false news about the COVID-19 pandemiy MD-MHLSP-185489-NC-DIR / Production of 5 video spots Pending to inform and raise awareness Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 5,000.00 0.00 Implementati 2020-07-26 2020-07-26 2020-08-02 2020-12-31 about COVID-19 and the Response on severity of the infection on health MD-MHLSP-185484-NC-RFQ- 2 / Development of Pending Emergency COVID-19 Request for Single Stage - One communication materials to IDA / 66320 Post Open - National 8,000.00 0.00 Implementati 2020-08-06 2020-08-19 2020-10-18 Response Quotations Envelope combat false news about the on COVID-19 pandemiy MD-MHLSP-210736-NC-DIR Emergency COVID-19 / Promotion of the MoHLSP on IDA / 66320 Post Direct Selection Direct 10,000.00 23,910.84 Signed 2020-12-21 2020-12-09 2020-12-21 2021-01-13 2021-01-25 2021-02-11 2021-04-25 Response viber comunity MD-MHLSP-210737-NC-DIR / Logistic services for communication and Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 30,000.00 70,031.99 Signed 2020-12-23 2021-01-28 2020-12-23 2021-02-11 2021-01-27 2021-02-18 2022-01-22 information actions with Response population in teh context of COVID-19 pandemic MD-MHLSP-216928-NC-DIR / Elaboration of the communication governmental platform to inform the Emergency COVID-19 IDA / 66320 Post Direct Selection Direct 10,000.00 5,866.25 Signed 2021-02-08 2021-01-28 2021-02-13 2021-02-11 2021-03-20 2021-02-19 2021-04-19 population relating Response vaccination against COVID- 19: www.vaccinareCOVID- 19.gov.md CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-MHLSP-174715-CS-CQS Consultant Emergency COVID-19 Pending / Design and Supervision of IDA / 66320 Post Qualification Open - National 200,000.00 0.00 2020-06-07 2020-06-28 2020-08-11 2020-09-10 2020-10-15 2021-04-13 Response Implementation refurbished ICUs Selection MD-MHLSP-174718-CS-CQS Consultant / Training of health Emergency COVID-19 Pending IDA / 66320 Post Qualification Open - National 400,000.00 0.00 2020-06-21 2020-07-12 2020-08-25 2020-09-24 2020-10-29 2021-04-27 professionals on IPC and Response Implementation Selection COVID treatment MD-MHLSP-174719-CS-CQS Consultant Emergency COVID-19 Pending / Development of a IDA / 66320 Post Qualification Open - National 100,000.00 0.00 2020-07-02 2020-07-23 2020-09-05 2020-10-05 2020-11-09 2021-05-08 Response Implementation communications strategy Selection MD-MHLSP-174723-CS-CQS Consultant Emergency COVID-19 Pending / Media training for IDA / 66320 Post Qualification Open - National 20,000.00 0.00 2020-06-16 2020-07-07 2020-08-20 2020-09-19 2020-10-24 2021-04-22 Response Implementation Journalists Selection MD-MHLSP-229969-CS-CQS Consultant / Consulting Services for Emergency COVID-19 Under IDA / 66320 Post Qualification Open - National 500,000.00 0.00 2021-04-30 2021-05-17 2021-05-21 2021-07-04 2021-08-03 2021-09-07 2021-12-06 Design and Supervision Response Implementation Selection (refurbishment of ICU Units) Page 4 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Implementation Management MD-MHLSP-174724-CS-CDS IDA / 66320 and Monitoring and Post Direct Selection Direct 60,000.00 0.00 Canceled 2020-06-01 2020-06-11 2020-08-15 2021-02-11 / Project Coordinator Evaluation Implementation Management MD-MHLSP-174725-CS-CDS IDA / 66320 and Monitoring and Post Direct Selection Direct 60,000.00 60,394.23 Signed 2020-06-01 2020-06-02 2020-06-11 2020-05-29 2020-08-15 2020-06-03 2021-02-11 / Procurement Specialist Evaluation MD-MHLSP-174726-CS-CDS Implementation Management / Financial Management IDA / 66320 and Monitoring and Post Direct Selection Direct 60,000.00 43,161.63 Signed 2020-06-01 2020-06-02 2020-06-11 2020-05-29 2020-08-15 2020-06-03 2021-02-11 Specialist Evaluation Implementation Management MD-MHLSP-174728-CS-CDS IDA / 66320 and Monitoring and Post Direct Selection Direct 28,000.00 0.00 Canceled 2020-06-01 2020-06-11 2020-08-15 2021-02-11 / Project Assistant Evaluation MD-MHLSP-182623-CS- Implementation Management Individual Under INDV / Environmental IDA / 66320 and Monitoring and Post Consultant Open 25,000.00 0.00 2020-07-01 2020-07-07 2020-07-18 2020-07-25 2020-08-01 2022-07-22 Implementation Specialist Evaluation Selection Implementation Management Individual MD-MHLSP-182626-CS- Under IDA / 66320 and Monitoring and Post Consultant Open 25,000.00 0.00 2020-07-01 2020-07-07 2020-07-14 2020-07-17 2020-07-21 2022-07-11 INDV / Social Specialist Implementation Evaluation Selection MD-MHLSP-182628-CS- Implementation Management Individual Under INDV / Social Safeguards IDA / 66320 and Monitoring and Post Consultant Open 15,000.00 0.00 2020-07-01 2020-07-07 2020-07-13 2020-07-16 2020-07-19 2021-07-14 Implementation Specialist Evaluation Selection Implementation Management Individual MD-MHLSP-182643-CS- Pending IDA / 66320 and Monitoring and Post Consultant Open 24,000.00 0.00 2020-07-21 2020-08-06 2020-08-16 2020-08-23 2022-08-13 INDV / Project Assistant Implementation Evaluation Selection MD-MHLSP-185487-CS-CDS / Update the new MOHLSP site Emergency COVID-19 Under IDA / 66320 Post Direct Selection Direct 1,000.00 0.00 2020-07-26 2020-07-28 2020-07-31 2020-08-04 2020-10-30 with information from the old Response Implementation site MD-MHLSP-188040-CS-CDS Implementation Management / Consulting Services for IDA / 66320 and Monitoring and Post Direct Selection Direct 6,500.00 0.00 Canceled 2020-08-10 2020-08-11 2020-08-17 2020-09-07 development of ESMF Evaluation Implementation Management Individual MD-MHLSP-200353-CS- Under IDA / 66320 and Monitoring and Post Consultant Open 24,000.00 0.00 2020-10-19 2020-11-03 2020-11-12 2020-11-22 2020-11-30 2021-04-22 INDV / Project Assistant Implementation Evaluation Selection Individual MD-MHLSP-174716-CS- Emergency COVID-19 Under IDA / 66320 Post Consultant Open 100,000.00 0.00 2020-10-19 2020-11-03 2020-11-09 2020-11-19 2020-11-29 2022-04-22 INDV / Civil works engineer Response Implementation Selection MD-MHLSP-200360-CS- Implementation Management Individual Under INDV / Communication IDA / 66320 and Monitoring and Post Consultant Open 30,000.00 0.00 2020-10-20 2020-11-03 2020-11-27 2020-11-29 2020-12-06 2022-04-22 Implementation Consultant Evaluation Selection MD-MHLSP-229955-CS- Implementation Management Individual Under INDV / Waste Management IDA / 66320 and Monitoring and Post Consultant Open 35,000.00 0.00 2021-04-22 2021-04-28 2021-05-22 2021-05-30 2021-06-01 2023-04-30 Implementation Expert Evaluation Selection MD-MHLSP-236316-CS-CDS / Development and Emergency COVID-19 Under Implementation of COVID-19 IDA / 66320 Post Direct Selection Direct 170,000.00 0.00 2021-05-27 2021-06-16 2021-06-02 2021-06-06 2021-10-04 Response Implementation Vaccine Communication and Education Campaign Page 5 PROCUREMENT PLAN (Textual Part) Project information: Mozambique Harnessing the Demographic Dividend (P166100) Project Implementation agency: Ministry of Youth and Sports Date of the Procurement Plan: February 12, 2019 Period covered by this Procurement Plan: February 12, 2019 – September 30, 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Mozambique Procurement Regulation (Decree 5/2016 of March 8, 2016), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Other Relevant Procurement Information: None PROCUREMENT Mozambique : Harnessing the Demographic Dividend PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2019-02-13 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166100 GPN Date: Project Name: Harnessing the Demographic Dividend Loan / Credit No: / , IDA / D5550, IDA / V2580 Ministry of Youth and Sports Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening youth policy MZ-MJD-97893-GO-RFP / Request for Single Stage - One / development and project Post Limited 20,000.00 18,890.60 Completed 2019-03-30 2019-10-30 2019-05-25 2020-03-11 2019-11-21 2020-11-17 Office furniture Quotations Envelope management Strengthening youth policy MZ-MJD-97970-GO-RFQ / Request for Single Stage - One / development and project Post Limited 36,000.00 26,014.10 Completed 2019-03-30 2020-02-21 2019-05-25 2020-03-11 2019-11-21 2020-12-07 informatic equipment Quotations Envelope management Strengthening youth policy MZ-MJD-97905-GO-UN / UN Agencies / development and project Post Direct 105,000.00 0.00 Canceled 2019-03-25 2019-03-30 2019-05-04 2019-10-31 Supply of 4 Vehicles (Direct) management MZ-MJD-166160-GO-RFB / Empowering and educating IDA / D5550 Post Request for Bids 600,000.00 495,279.09 Signed 2020-04-08 2020-06-18 2020-04-16 2020-06-19 2020-04-16 2020-07-31 2020-04-16 2020-10-08 2020-04-16 2020-11-27 2020-04-16 school uniform adolescents Strengthening youth policy MZ-MJD-161802-GO-RFB / Single Stage - One IDA / D5550 development and project Post Request for Bids Open - National 160,000.00 0.00 Canceled 2020-03-13 2020-06-18 2020-03-18 2020-04-29 2020-05-29 2020-07-03 2020-12-30 Supply of 4 vehicles Envelope management Strengthening youth policy MZ-MJD-180807-GO-RFB / Single Stage - One IDA / D5550 development and project Post Request for Bids Open - National 160,000.00 160,076.63 Completed 2020-06-19 2020-07-20 2020-06-24 2020-08-05 2020-07-23 2020-09-04 2020-08-17 2020-10-09 2020-08-28 2021-04-07 2020-10-28 Supply of 6 vehicles Envelope management Strengthening youth policy MZ-MJD-184861-GO-RFB / Single Stage - One IDA / D5550 development and project Post Request for Bids Open - National 380,000.00 181,255.01 Completed 2020-07-27 2020-08-13 2020-08-01 2020-08-13 2020-09-12 2020-09-14 2020-10-12 2020-12-17 2020-11-16 2020-12-17 2021-05-15 2021-03-29 sewing tool kits Envelope management MZ-SEJE-218592-GO-RFB / Under Empowering and educating Single Stage - One School Uniform for 7 IDA / D5550 Prior Request for Bids Open - National 2,677,600.00 0.00 Implementati 2021-04-14 2021-04-19 2021-05-31 2021-06-30 2021-08-04 2022-01-31 adolescents Envelope Provinces on Under MZ-SEJE-218594-GO-RFB / Empowering and educating Single Stage - One IDA / D5550 Prior Request for Bids Open - National 2,000,000.00 0.00 Implementati 2021-04-14 2021-04-19 2021-05-31 2021-06-30 2021-08-04 2022-01-31 Acquisition of Bikes adolescents Envelope on Under MZ-SEJE-218598-GO-RFB / Empowering and educating Single Stage - One IDA / D5550 Post Request for Bids Open - National 405,000.00 0.00 Implementati 2021-04-14 2021-06-20 2021-04-19 2021-06-20 2021-05-31 2021-06-30 2021-08-04 2022-01-31 Acquisition of 10 Vehicles adolescents Envelope on MZ-SEJE-218780-GO-RFB / Strengthening youth policy Pending Equipment for Youth Single Stage - One IDA / D5550 development and project Post Request for Bids Limited 175,000.00 0.00 Implementati 2021-03-24 2021-03-29 2021-05-10 2021-06-09 2021-07-14 2022-01-10 Resources Centers ( Envelope management on Computers & Office) Strengthening youth policy Pending MZ-SEJE-218787-GO-RFQ / Request for Single Stage - One IDA / D5550 development and project Post Limited 36,000.00 0.00 Implementati 2021-03-05 2021-04-30 2021-10-27 acquisition of boxes for GRM Quotations Envelope management on Pending MZ-SEJE-218600-GO-RFB / Empowering and educating Single Stage - One IDA / D5550 Post Request for Bids Open - National 850,000.00 0.00 Implementati 2021-03-17 2021-03-22 2021-05-03 2021-06-02 2021-07-07 2022-01-03 Sport Kits adolescents Envelope on Strengthening youth policy Pending MZ-MJD-219051-GO-RFB / Single Stage - One IDA / D5550 development and project Post Request for Bids Limited 135,000.00 0.00 Implementati 2021-03-16 2021-03-21 2021-05-02 2021-06-01 2021-07-06 2022-01-02 Serigraph & Graphic Services Envelope management on Strengthening youth policy Under MZ-MJD-225358-GO-RFQ / Request for Single Stage - One IDA / D5550 development and project Post Limited 20,000.00 15,152.81 Implementati 2021-04-04 2021-03-30 2021-05-30 2021-11-26 Stationery Quotations Envelope management on Strengthening youth policy Under MZ-MJD-225647-GO-RFQ / Request for Single Stage - One IDA / D5550 development and project Post Limited 60,000.00 80,700.40 Implementati 2021-03-28 2021-03-24 2021-05-23 2021-11-19 Acquisition of Face Mask Quotations Envelope management on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-MJD-97956-NC-RFQ / Strengthening youth policy Request for Single Stage - One Serigraphy and reprography IDA / D5550 development and project Post Limited 10,000.00 0.00 Canceled 2019-03-30 2019-05-25 2019-11-21 Quotations Envelope services management Strengthening youth policy MZ-SEJE- 189133-NC-DIR / IDA / D5550 development and project Post Direct Selection 55,796.00 54,510.72 Completed 2020-08-17 2020-08-20 2020-08-17 2020-08-25 2020-08-17 2020-07-30 2020-08-17 2021-02-26 E Learning management Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-MJD-97739-CS-INDV / Strengthening youth policy Consultant Consultant for IDA / V2580 development and project Post Qualification Open - National 20,000.00 0.00 Canceled 2019-03-21 2019-04-11 2019-05-09 2019-05-25 2019-06-24 2019-07-29 2020-01-25 Communication, Marketing management Selection and Advertising MZ-MJD-184299-CS-CQS / Consultant Empowering and educating Consultant to map GBV IDA / D5550 Post Qualification Open - National 80,000.00 75,493.53 Signed 2020-07-31 2020-07-22 2020-08-21 2020-07-24 2020-10-04 2020-09-18 2020-11-03 2020-11-06 2020-12-08 2020-11-19 2021-06-06 adolescents services and SSSR Selection MZ-MJD-169795-CS-QCBS / Consultant Consultant services for Empowering and educating IDA / D5550 Post Qualification Open - National 70,000.00 0.00 Canceled 2020-07-27 2020-08-28 2020-08-17 2020-09-30 2020-10-30 2020-12-04 2021-06-02 technical assistance in the adolescents Selection distribution of school uniform MZ-MJD-169789-CS-QCBS / Consultancy to support the Promoting opportunities for Quality And Cost- Under implementation of the IDA / D5550 Post Open - National 400,000.00 0.00 2020-08-04 2020-09-18 2020-08-25 2020-09-22 2020-10-08 2021-01-25 2020-11-05 2021-03-26 2020-12-05 2021-05-24 2021-01-09 2021-02-13 2022-02-13 productive employment Based Selection Implementation Support to Productivity Program (SPP) in the south of Mozambique. MZ-MJD-169654-CS-QCBS / Consultancy services to support the implementation Promoting opportunities for Quality And Cost- IDA / D5550 Post Open - National 400,000.00 0.00 Canceled 2020-09-04 2020-09-25 2020-11-08 2020-12-06 2021-01-05 2021-02-09 2021-03-16 2022-03-16 of the Support to Productivity productive employment Based Selection Program (SPP) in the Center Region of Mozambique. MZ-MJD-169650-CS-QCBS / Consultancy to support the implementation of the Promoting opportunities for Quality And Cost- IDA / D5550 Post Open - National 400,000.00 0.00 Canceled 2020-09-08 2020-09-29 2020-11-12 2020-12-10 2021-01-09 2021-02-13 2021-03-20 2022-03-20 Support to Productivity productive employment Based Selection Program (SPP) in the Northern Region of Mozambique MZ-MJD-169644-CS-QCBS / Consultant services for Promoting opportunities for Quality And Cost- IDA / D5550 Prior Open - International 2,000,000.00 0.00 Canceled 2020-07-20 2020-08-10 2020-09-23 2020-10-21 2020-11-20 2020-12-25 2021-01-29 2022-01-29 technical assistance for the productive employment Based Selection Business Plan Competition Strengthening youth policy Consultant MZ-MJD-184309-CS-CQS / IDA / D5550 development and project Post Qualification Open - National 50,000.00 0.00 Canceled 2020-07-31 2020-08-21 2020-10-04 2020-11-03 2020-12-08 2021-06-06 Media services management Selection MZ-MJD-191688-CS-QCBS / Consultant services for Promoting opportunities for Quality And Cost- Under IDA / D5550 Prior Open - International 900,000.00 0.00 2020-09-08 2020-10-01 2020-09-29 2020-10-12 2020-11-12 2021-06-21 2020-12-10 2021-05-25 2021-01-09 2021-06-22 2021-02-13 2021-03-20 2022-03-20 technical assistance for the productive employment Based Selection Implementation Business Plan Competition MZ-MJD-192429-CS-QCBS / Empowering and educating Quality And Cost- Technical Assistance in the IDA / D5550 Post Open - National 70,000.00 120,751.07 Signed 2020-09-08 2020-09-16 2020-09-29 2020-09-18 2020-11-12 2020-10-29 2020-12-10 2020-12-01 2021-01-09 2020-12-03 2021-02-13 2020-12-23 2021-03-20 2021-01-05 2022-03-20 adolescents Based Selection distribution of school uniform MZ-MJD-191575-CS-QCBS / Hire service provider for Promoting opportunities for Quality And Cost- Under business training in the IDA / D5550 Prior Open - International 750,000.00 0.00 2020-09-04 2020-10-13 2020-09-25 2020-10-29 2020-11-08 2021-04-29 2020-12-06 2021-01-05 2021-02-09 2021-03-16 2022-03-16 productive employment Based Selection Implementation context of the business plan competition MZ-MJD-191680-CS-QCBS / Strengthening youth policy Quality And Cost- Under Communication, marketing IDA / D5550 development and project Prior Open - National 500,000.00 0.00 2020-09-08 2020-10-28 2020-09-29 2020-11-04 2020-11-12 2021-06-07 2020-12-10 2021-03-29 2021-01-09 2021-06-08 2021-02-13 2021-03-20 2022-03-20 Based Selection Implementation and media services management MZ-SEJE-218591-CS-QCBS / Gender Transformation Skills Promoting opportunities for Quality And Cost- Pending IDA / D5550 Prior Open - International 1,000,000.00 0.00 2021-04-06 2021-04-27 2021-06-10 2021-07-08 2021-08-07 2021-09-11 2021-10-16 2022-10-16 Programs for Those in self productive employment Based Selection Implementation Employment MZ-SEJE-223081-CS-QCBS / Support to Productivity Promoting opportunities for Quality And Cost- Under IDA / D5550 Prior Open - International 550,000.00 0.00 2021-03-22 2021-03-22 2021-04-12 2021-06-21 2021-05-26 2021-06-23 2021-07-23 2021-08-27 2021-10-01 2022-10-01 Program (SPP) in the Northern productive employment Based Selection Implementation Region of Mozambique MZ-SEJE-223085-CS-QCBS / Support to Productivity Promoting opportunities for Quality And Cost- Under IDA / D5550 Prior Open - International 550,000.00 0.00 2021-03-30 2021-03-22 2021-04-20 2021-04-20 2021-06-03 2021-07-01 2021-07-31 2021-09-04 2021-10-09 2022-10-09 Program (SPP) in the Center productive employment Based Selection Implementation Region of Mozambique MZ-SEJE-218585-CS-QCBS / Technical Assistance- Empowering and educating Quality And Cost- Implementing partners For IDA / D5550 Prior Open - International 3,400,000.00 0.00 Canceled 2021-03-08 2021-03-29 2021-05-12 2021-06-09 2021-07-09 2021-08-13 2021-09-17 2022-09-17 adolescents Based Selection Safe Spaces Programs full Scale ( Zambezia) MZ-MJD-218572-CS-QCBS / Technical Assistance - Empowering and educating Quality And Cost- implementing Partners for the IDA / D5550 Prior Open - International 5,150,000.00 0.00 Canceled 2021-07-27 2021-08-17 2021-09-30 2021-10-28 2021-11-27 2022-01-01 2022-02-05 2023-02-05 adolescents Based Selection Safe Spaces Programs (Manica, Sofala e Maputo) MZ-MJD-218588-CS-QCBS / Technical Assistance - Empowering and educating Quality And Cost- Implementing Partners for IDA / D5550 Prior Open - International 1,800,000.00 0.00 Canceled 2021-02-15 2021-03-08 2021-04-21 2021-05-19 2021-06-18 2021-07-23 2021-08-27 2022-08-27 adolescents Based Selection Safe Spaces Programs Manica e Sofala ( Pilot Phase) MZ-SEJE-218589-CS-QCBS / Technical Assistance - Empowering and educating Quality And Cost- Implementing Partners for IDA / D5550 Prior Open - International 3,100,000.00 0.00 Canceled 2021-03-23 2021-04-13 2021-05-27 2021-06-24 2021-07-24 2021-08-28 2021-10-02 2022-10-02 adolescents Based Selection Safe Spaces Programs Nampula e Cabo Delgado MZ-MJD-225654-CS-QCBS / Outsourcing service for Consultant Empowering and educating Pending Human Resources and IDA / D5550 Post Qualification Open - National 160,000.00 0.00 2021-04-29 2021-05-20 2021-07-03 2021-08-02 2021-09-06 2022-03-05 adolescents Implementation Financial Management for "Eu Selection Sou Capaz" Program Page 2 MZ-MJD-225650-CS-QCBS / Technical Assistance - Empowering and educating Quality And Cost- Under IDA / D5550 Prior Open - International 11,000,000.00 0.00 2021-05-14 2021-05-27 2021-06-04 2021-06-04 2021-07-18 2021-08-15 2021-09-14 2021-10-19 2021-11-23 2022-11-23 Implementing Partners for adolescents Based Selection Implementation Safe Spaces INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening youth policy Individual MZ-MJD-96701-CS-INDV / / development and project Post Consultant Open 47,000.00 86,400.00 Signed 2019-02-25 2019-03-06 2019-04-15 2020-04-16 2019-05-06 2020-05-03 2019-06-10 2020-05-12 2019-12-07 Project Manager management Selection MZ-MJD-96719-CS-INDV / Strengthening youth policy Individual Financial Management / development and project Post Consultant Open 39,000.00 43,200.00 Signed 2019-02-25 2019-03-12 2019-04-15 2020-04-16 2019-05-06 2020-05-03 2019-06-10 2020-05-12 2019-12-07 Specialist management Selection Strengthening youth policy Individual MZ-MJD-96724-CS-INDV / IDA / D5550 development and project Prior Consultant Open 35,000.00 32,363.37 Signed 2019-02-25 2019-03-12 2019-04-15 2020-02-15 2019-05-06 2020-02-27 2019-06-10 2020-05-12 2020-06-09 Procurement Specialist management Selection Strengthening youth policy Individual MZ-MJD-96732-CS-QCBS / IDA / V2580 development and project Post Consultant Open 20,000.00 6,033.91 Completed 2019-02-25 2019-03-27 2019-04-15 2019-08-12 2019-05-06 2020-01-28 2019-06-10 2020-01-30 2019-12-07 2020-03-30 Procurement Strategy management Selection MZ-MJD-97740-CS-INDV / Strengthening youth policy Individual Consultant to Assist in the Pending / development and project Post Consultant Open 10,000.00 0.00 2019-02-25 2019-04-15 2019-04-30 2019-06-04 2019-12-01 Development of an Operations Implementation management Selection Manual Individual MZ-MJD-97742-CS-INDV / Empowering and educating / Post Consultant Open 22,000.00 50,400.00 Signed 2019-02-25 2019-03-04 2019-04-15 2020-04-15 2019-05-06 2020-05-03 2019-06-10 2020-05-25 2020-06-09 Education Specialist adolescents Selection Individual MZ-MJD-97745-CS-INDV / Promoting opportunities for / Post Consultant Open 22,000.00 50,400.00 Signed 2019-03-06 2019-03-04 2019-04-24 2020-04-15 2019-05-15 2020-05-03 2019-06-19 2020-05-13 2019-12-16 Labour Specialist productive employment Selection MZ-MJD-97752-CS-INDV / Individual Empowering and educating Pending Consultant for curricula and / Post Consultant Open 23,000.00 0.00 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2020-06-09 adolescents Implementation mapping skills services Selection MZ-MJD-165385-CS-INDV / Strengthening youth policy Individual Communication and IDA / D5550 development and project Post Consultant Open 18,000.00 24,000.00 Signed 2020-03-30 2020-04-22 2020-05-18 2020-09-16 2020-06-08 2020-09-18 2020-07-13 2020-10-01 2021-01-09 Marketing Specialist management Selection MZ-MJD-165386-CS-INDV / Strengthening youth policy Individual Specialist in Environmental IDA / D5550 development and project Post Consultant Open 18,000.00 46,500.00 Signed 2020-03-30 2020-07-22 2020-05-18 2020-11-04 2020-06-08 2020-11-04 2020-07-13 2020-11-12 2021-01-09 and Social Management management Selection MZ-MJD-165399-CS-INDV / Strengthening youth policy Individual Specialist in information Pending IDA / D5550 development and project Post Consultant Open 27,000.00 0.00 2020-07-15 2020-09-02 2020-09-23 2020-10-28 2021-04-26 management system and data Implementation management Selection collection MZ-MJD-97737-CS-INDV / Strengthening youth policy Individual Specialist in information / development and project Post Consultant Open 27,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 management system and data management Selection collection Strengthening youth policy Individual MZ-MJD-97750-CS-INDV / / development and project Post Consultant Open 5,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2020-06-09 Legal Assistence management Selection MZ-MJD-167333-CS-INDV / Individual Consultant to map important Empowering and educating IDA / D5550 Post Consultant Open 40,000.00 0.00 Canceled 2020-04-30 2020-06-18 2020-07-09 2020-08-13 2021-02-09 services on the Education adolescents Selection component MZ-MJD-167338-CS-INDV / Individual Consultant to map important Promoting opportunities for IDA / D5550 Post Consultant Open 36,620.00 25,000.00 Completed 2020-04-30 2020-07-27 2020-06-18 2020-12-04 2020-07-09 2020-11-25 2020-08-13 2020-11-26 2021-02-09 2021-03-25 services on the Employment productive employment Selection component MZ-MJD-96728-CS-QCBS / Strengthening youth policy Individual Consulting for Environmental / development and project Post Consultant Open 20,000.00 0.00 Canceled 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 and Social Management management Selection MZ-MJD-182388-CS-INDV / Strengthening youth policy Individual Consulting for Environmental IDA / D5550 development and project Post Consultant Limited 20,000.00 30,988.00 Completed 2020-07-30 2020-08-25 2020-08-04 2020-08-28 2020-08-25 2020-09-18 2020-09-29 2020-09-21 2021-03-28 2021-01-11 and Social Management management Selection MZ-MJD-184297-CS-INDV / Strengthening youth policy Individual Pending Software Design and IDA / D5550 development and project Post Consultant Open 20,000.00 0.00 2020-07-24 2020-09-11 2020-10-02 2020-11-06 2021-05-05 Implementation Developer Specialist management Selection MZ-MJD-184317-CS-INDV / Strengthening youth policy Individual Consulting for IDA / D5550 development and project Post Consultant Open 18,000.00 0.00 Canceled 2020-07-31 2020-09-18 2020-10-09 2020-11-13 2021-05-12 Communication and management Selection Marketing MZ-MJD-168665-CS-INDV / Strengthening youth policy Individual Consultant for Grievance IDA / D5550 development and project Post Consultant Open 20,000.00 20,250.00 Completed 2020-08-24 2020-07-22 2020-10-12 2020-09-10 2020-11-02 2020-09-17 2020-12-07 2020-09-21 2021-06-05 2021-01-21 Resolution System management Selection MZ-SEJE-190990-CS-INDV / Strengthening youth policy Individual Monitoring&Evaluation IDA / D5550 development and project Post Consultant Open 30,000.00 46,800.00 Signed 2020-08-28 2020-09-15 2020-10-08 2021-02-02 2020-10-29 2021-02-04 2020-12-03 2021-02-15 2021-06-01 Specialist management Selection Strengthening youth policy Individual MZ-SEJE-195572-CS-INDV / IDA / D5550 development and project Post Consultant Open 30,000.00 60,000.00 Signed 2020-09-22 2020-09-29 2020-11-10 2020-12-17 2020-12-01 2020-12-21 2021-01-05 2021-01-20 2021-07-04 Economic Adviser management Selection Page 3 Strengthening youth policy Individual MZ-SEJE-218791-CS-INDV / Under IDA / D5550 development and project Post Consultant Limited 9,000.00 0.00 2021-02-28 2021-04-08 2021-03-05 2021-03-26 2021-04-30 2021-10-27 Hire Accountant Implementation management Selection Strengthening youth policy Individual MZ-MJD-201040-CS-INDV / IDA / D5550 development and project Prior Consultant Open 36,000.00 0.00 Canceled 2020-10-28 2020-11-11 2020-12-16 2021-01-06 2021-02-10 2021-08-09 Procurement Assistante management Selection Strengthening youth policy Individual MZ-MJD-225354-CS-INDV / IDA / D5550 development and project Post Consultant Open 36,000.00 0.00 Canceled 2021-04-08 2021-04-20 2021-05-27 2021-06-17 2021-07-22 2022-01-18 Procurement Assistant management Selection Strengthening youth policy Individual MZ-MJD-232434-CS-INDV / Under IDA / D5550 development and project Prior Consultant Open 48,000.00 0.00 2021-05-19 2021-05-30 2021-07-07 2021-07-28 2021-09-01 2022-02-28 Junior Procurement officer Implementation management Selection MZ-MJD-236261-CS-INDV / Strengthening youth policy Individual Under Digital Marketing & IDA / D5550 development and project Post Consultant Open 18,000.00 0.00 2021-05-31 2021-05-28 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Implementation Photographer technician management Selection Page 4 PROCUREMENT PLAN Project information: Country: Bangladesh Project Name: Bangladesh COVID-19 Emergency Preparedness and Response Project P-number: P173757 Project Implementation agency: (i) Ministry of Health and Family Welfare (MoHFW) (ii) Central Medical Stores Depot (CMSD) (iii) Public Works Department (PWD) Period covered by this Procurement Plan: Entire Project Period Preamble In accordance with paragraph 5.9 of the World Bank Procurement Regulations for IPF Borrowers, July 2016, revised November 2017 and August 2018 (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents (SPDs) shall be used for goods, works and non- consulting services where international competition is required and for consulting services, including their respective forms of contract. National Procurement Arrangements: In accordance with paragraph 5.3 of the World Bank Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan, the country’s own procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti- Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Act 2006 and the Public Procurement Rules 2008, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: i. Lottery in award of contracts shall not be allowed; ii. Bidders’ qualification[s]/experience requirement[s] shall be mandatory; iii. Bids shall not be rejected based on percentage above or below the estimated cost; iv. Model Bidding Documents agreed with the Bank shall be used for all national open competitive procurement; v. The eligibility of bidders shall be as defined under Section III of the World Bank Procurement Regulations for IPF Borrowers: accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. vi. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. vii. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. As per paragraph 5.4 of the Procurement Regulations, the “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework” as attached to this document shall form part of the Model Bidding Documents. Leased Assets: Not Applicable. Procurement of Second-Hand Goods: as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables - Applicable” Domestic preference: as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works) as follows: Goods: Applicable; Works: Not applicable. Hands-on Expanded Implementation Support (HEIS): as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Bank’s Procurement Prior Review Thresholds: As this is an emergency response project, there will be no prior review for all procurement during the immediate response period. The project will also have increased threshold for Request for Quotations (RFQ) and national procurement, as applicable in emergency projects. Fraud and Corruption (F&C) Checklist: Fraud and Corruption (F&C) checklist, as developed and provided by the Bank, shall be properly filled in during the evaluation and be attached with the evaluation report in case of contracts following national competitive procurement and request for quotations. Attachment 1 Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. Title of the person signing the Letter: PROCUREMENT Bangladesh : Bangladesh: COVID-19 Emergency Response and Pandemic Preparedness Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2021-05-26 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173757 GPN Date: 2020-07-21 Project Name: Bangladesh: COVID-19 Emergency Response and Pandemic Preparedness Project Loan / Credit No: IDA / 66050 P Executing Agency(ies): ublic Works Department WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DHK-2/WB-AIIB/WD-1 / Establishment of Modern National Microbiology Laboratory with Procurement Pending Component 1: Emergency Single Stage - One 2022-02- PCR (Dhaka Medical College, IDA / 66050 Post Request for Bids Open - National Document - 1 177,305.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 Sir Salimullah Medical College Envelope process ion Mitford Hospital and Mugda (Non Bank-SPD) 500 Bedded General Hospital ) DHK-3/WB-AIIB/WD-2 / 1) Establishment of Modern Microbiology Lab at Kurmitola General Hospital. National 2) Establishment of 10 bed Procurement Pending ICU at Shaheed Sohrawardi Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 591,017.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 M.C.Hospital. COVID-19 Response Envelope 11 Envelope process ion 3) Estab. of medical centre in (Non Bank-SPD) HSIA 4) BSL lab at IEDCR 5) Estab. of 5 bed ICU in IDH 6) Medical gas pipe.sy SAVAR/WB-AIIB/WD-3 / 1) Establishment of Modern Microbiology Lab in Shaheed National Tajuddin Ahmed M.C.H Procurement Under Component 1: Emergency Single Stage - One 2022-02- 2) Establishment of 10 bed IDA / 66050 Post Request for Bids Open - National Document - 1 153,664.00 0.00 Implementat 2021-04-25 2021-04-28 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 ICU at Colonel Malek M.C.H, Envelope process ion Manikganj (Non Bank-SPD) 3) Installation of Medical gas pipeline system. GOPAL/WB-AIIB/WD-4 / 1) Establishment of Modern Microbiology Lab at Shekh National Sayera Khatun Medical College Procurement Pending Component 1: Emergency Single Stage - One 2022-02- Hospital. IDA / 66050 Post Request for Bids Open - National Document - 1 153,664.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 2) Establishment of 10 bed Envelope process ion ICU at Faridpur M.C.H (Non Bank-SPD) 3) Installation of gas pipeline system. National RAJ/WB-AIIB/WD-5 / 1) Procurement Pending Establishment of Modern Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 59,102.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 Microbiology Lab at Rajshahi COVID-19 Response Envelope 11 Envelope process ion Medical College Hospital. (Non Bank-SPD) PABN/WB-AIIB/WD-6 / 1) National Establishment of Modern Procurement Pending Component 1: Emergency Single Stage - One 2022-02- Microbiology Lab with PCR at IDA / 66050 Post Request for Bids Open - National Document - 1 59,102.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 Pabna Medical College Envelope process ion Hospital. (Non Bank-SPD) BAGU/WB-AIIB/WD-7 / 1) Establishment of Modern Microbiology Lab with PCR in Shaheed Ziaur Rahman National Medical College and Hospital. Procurement Pending Component 1: Emergency Single Stage - One 2022-02- 2) Establishment of 10 bed IDA / 66050 Post Request for Bids Open - National Document - 1 153,664.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 ICU at Shaheed Ziaur Rahman Envelope process ion Medical College and Hospital (Non Bank-SPD) at Bogura. 3) Installation of gaspipeline system. KHUL/WB-AIIB/WD-8 / 1) Establishment of Modern National Microbiology Lab with PCR in Procurement Pending Khulna and Shatkhira Medical Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 224,586.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 College hospital. COVID-19 Response Envelope 11 Envelope process ion 2) Establishment of medical (Non Bank-SPD) centre in Mongla seaport at Bagerhat JESOR/WB-AIIB/WD-9 / National Establishment of Modern Procurement Pending Component 1: Emergency Single Stage - One 2022-02- Microbiology lab with PCR in IDA / 66050 Post Request for Bids Open - National Document - 1 59,102.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 Kushtia Medical College Envelope process ion Hospital. (Non Bank-SPD) BAR/WB-AIIB/WD-10 / 1) Establishment of Modern Microbiology Lab with PCR in National Barishal Medical College and Procurement Pending Hospital. Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 153,664.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 2) Establishment of 10 bed COVID-19 Response Envelope 11 Envelope process ion ICU at Shere Bangla Medical (Non Bank-SPD) College and Hospital, Barishal. 3) Installation of gaspipeline system. CTG-1/WB-AIIB/WD-11 / 1) National Establishment of Modern Procurement Pending Component 1: Emergency Single Stage - One 2022-02- Microbiology Lab with PCR in IDA / 66050 Post Request for Bids Open - National Document - 1 118,203.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 Chattogram Medical College Envelope process ion and Hospital. (Non Bank-SPD) Page 1 CTG-2/WB-AIIB/WD-12 / 1) Establishment of Modern Microbiology Lab with PCR in Cox's Bazar Medical College National and Hospital. Procurement Pending 2) Estab. of medical center at Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 437,352.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 Chattagram seaport and SASIA COVID-19 Response Envelope 11 Envelope process ion 3) Estab. of 5 bed ICU at IDH (Non Bank-SPD) Chattagram . 4) Installation of gaspipeline system. 5) BSL 3 LAB RANGA/WB-AIIB/WD-13 / 1) National Establishment of Modern Procurement Pending Component 1: Emergency Single Stage - One 2022-02- Microbiology Lab with PCR in IDA / 66050 Post Request for Bids Open - National Document - 1 118,203.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 Rangamati Medical College Envelope process ion and Hospital. (Non Bank-SPD) CUM/WB-AIIB/WD-14 / 1) National Establishment of Modern Procurement Pending Component 1: Emergency Single Stage - One 2022-02- Microbiology Lab with PCR in IDA / 66050 Post Request for Bids Open - National Document - 1 59,102.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 Chandpur Medical College and Envelope process ion Hospital. (Non Bank-SPD) SYLHET/WB-AIIB/WD-15 / 1) Establishment of Modern Microbiology Lab with PCR in Sylhet, Shekh Hasina and National Habiganj Medical College Procurement Pending Hospital. Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 260,047.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 2) Estab. of 10 bed ICU at COVID-19 Response Envelope 11 Envelope process ion Sylhet MAG Osmani Medical (Non Bank-SPD) College Hospital. 3)Estab. of medical center 3) Installation of gaspipeline system. RANG/WB-AIIB/WD-16 / 1) National Establishment of Modern Procurement Pending Component 1: Emergency Single Stage - One 2022-02- Microbiology Lab with PCR in IDA / 66050 Post Request for Bids Open - National Document - 1 59,102.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 Rangpur Medical College and Envelope process ion Hospital. (Non Bank-SPD) DHK-3/WB-AIIB/WD-1 / National Construction of Building for Procurement Pending Medical Waste Management Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 177,305.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 systems at Shaheed COVID-19 Response Envelope 11 Envelope process ion Sohrawardi Medical College (Non Bank-SPD) Hospital. DHK-4/WB-AIIB/WD-2 / 1) Construction of Building for Medical Waste Management systems( Narayanganj 300 National beded sadar hospital and Procurement Pending Component 1: Emergency Single Stage - One 2022-02- Narshindi sadar hospital) IDA / 66050 Post Request for Bids Open - National Document - 1 1,170,213.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 2) Establishment of 20 bed Envelope process ion isolation unit and 10 bed ICU (Non Bank-SPD) at Narshindi sadar hospital. 3) Installation of medical gas pipe SAVAR/WB-AIIB/WD-3/1 / National Construction of Building for Procurement Under Medical Waste Management Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 177,305.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 System at Colonel Malek COVID-19 Response Envelope 11 Envelope process ion Medical College Hospital, (Non Bank-SPD) Manikganj GOPAL/WB-AIIB/WD-4/1 / 1) Construction of Building for Medical Waste Management System at Faridpur Medical National College Hospital. Procurement Pending Component 1: Emergency Single Stage - One 2022-02- 2) Estab. of 20 bed isolation IDA / 66050 Post Request for Bids Open - National Document - 1 1,808,511.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 unit and 10 bed ICU at Envelope process ion Shariatpur and Rajbari sadar (Non Bank-SPD) hospital 3) Installation of medical gas p. sy. at Shariatpur Rajbari RAJ/WB-AIIB/WD-5/1 / 1) Construction of Building for Medical Waste Management System at Chapainowabganj National General Hospital. Procurement Pending Component 1: Emergency Single Stage - One 2022-02- 2) Establishment of 20 bed IDA / 66050 Post Request for Bids Open - National Document - 1 945,626.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 isolation unit and 10 bed ICU Envelope process ion at Chapainowabganj sadar (Non Bank-SPD) Hospital. 3) Installation of medical gas pipeline system at Chapai.S.H PABN/WB-AIIB/WD-6/1 / 1) Construction of Building for Medical Waste Management System at Natore District National Hospital. Procurement Pending 2) Establishment of 20 bed Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 1,808,511.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 isolation unit and 10 bed ICU COVID-19 Response Envelope 11 Envelope process ion at Shirajganj and Natore sadar (Non Bank-SPD) Hospital 3)Instal. of medical gas pipeline sys. at Shirajganj ,Natore S.H BAGU/WB-AIIB/WD-7/1 / 1) Construction of Building for Medical Waste Management System at Shaheed Ziaur National Rahman Medical College. Procurement Pending Component 1: Emergency Single Stage - One 2022-02- 2) Establishment of 20 bed IDA / 66050 Post Request for Bids Open - National Document - 1 992,908.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 isolation unit and 10 bed ICU Envelope process ion at Joypurhat sadar hospital. (Non Bank-SPD) 3)Installation of medical gas pipeline system at Joypurhat sadrH Page 2 KHUL/WB-AIIB/WD-8/1 / 1) Construction of Building for Medical Waste Management National System at Khulna M.C.H Procurement Pending 2) Establishment of 20 bed Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 992,908.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 isolation unit and 10 bed ICU COVID-19 Response Envelope 11 Envelope process ion at Khulna Sadar hospital (Non Bank-SPD) 3) Installation of medical gas pipeline system at Khulna Sadar hospital. JESOR/WB-AIIB/WD-9/1 / 1)Construction of Building for Medical Waste Management System at jashore District National Hospital. Procurement Pending 2)Estab. of 20 bed isolation Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 3,900,709.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 unit and 10 bed ICU at COVID-19 Response Envelope 11 Envelope process ion Narail,Jhinaidah,Kushtia,Magu (Non Bank-SPD) ra,Meherpur sadar.H 3)Instal. of medical gas pipeline system at above hospitals BAR/WB-AIIB/WD-10/1 / 1) Construction of Building for Medical Waste Management System at shere bangla M.C.H,Barishal, Bhola District National H. Procurement Pending Component 1: Emergency Single Stage - One 2022-02- 2)Establishment of 20 bed IDA / 66050 Post Request for Bids Open - National Document - 1 3,617,021.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 isolation unit and 10 bed ICU Envelope process ion at (Non Bank-SPD) Bhola,Jhalokathi,Barguna,Piroj pur S.H. 3) Instal. of medical gas pipeline system CUM/WB-AIIB/WD-11 / 1) Construction of Building for Medical Waste Management System in feni District hospital National and Cumilla M.C Procurement Pending Component 1: Emergency Single Stage - One 2022-02- 2)Establishment of 20 bed IDA / 66050 Post Request for Bids Open - National Document - 1 1,168,204.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 isolation unit and 10 bed ICU Envelope process ion at Laxmipur sadar hospital (Non Bank-SPD) 3) Installation of medical gas pipeline system at Laxmipur sadar.H RANGM/WB-AIIB/WD-12 / 1) Establishment of 20 bed isolation unit and 10 bed ICU National at Procurement Pending Rangamati,Khagrachori,Banda Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 2,446,809.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 rban sadar hospital COVID-19 Response Envelope 11 Envelope process ion 2)Installation of medical gas (Non Bank-SPD) pipeline system at Rangamati,Khagrachori,Banda rban sadar hospital SYLHET/WB-AIIB/WD-13 / 1)Construction of Building for Medical Waste Management System at Sylhet MAG Osmani National M.C.H and Moulvibazar Procurement Pending Component 1: Emergency Single Stage - One 2022-02- District Hospital IDA / 66050 Post Request for Bids Open - National Document - 1 1,170,213.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 2)Establishment of 20 bed Envelope process ion isolation unit and 10 bed ICU (Non Bank-SPD) at Sylhet S.H 3)Installation of medical gas pipeline system at Sylhet S.H DINJ/WB-AIIB/WD-14 / 1) Construction of Building for Medical Waste Management System at M.A.Rahim M.C.H National Dinajpur, Procurement Pending Thakurgaon,Nilphamari D.H Component 1: Emergency Single Stage - One 2022-02- IDA / 66050 Post Request for Bids Open - National Document - 1 3,745,035.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 2) Estab. of 20 bed isolation COVID-19 Response Envelope 11 Envelope process ion unit and 10 bed ICU at (Non Bank-SPD) Dinajpur, Thakurgaon,Nilphamari ,Pnchagar sadar H. 3)Instal. of medical gas P.S RANG/WB-AIIB/WD-16/1 / 1)Establishment of 20 bed isolation unit and 10 bed ICU National at Gaibandha,Lalmonirhat Procurement Pending Component 1: Emergency Single Stage - One 2022-02- sadar Hospital IDA / 66050 Post Request for Bids Open - National Document - 1 1,631,206.00 0.00 Implementat 2021-04-25 2021-04-30 2021-06-11 2021-07-11 2021-08-15 COVID-19 Response Envelope 11 2) Installation of medical gas Envelope process ion pipeline system at (Non Bank-SPD) Gaibandha,Lalmonirhat sadar Hospital GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 4 PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, Africa CDC Regional Investment Financing Program, P167916 Project Implementation agency: Ministry of Health and Ethiopian Public Health Institute Date of the Procurement Plan: August 19,2019 Period covered by this Procurement Plan: August 2019 to August 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Section 33(1)(a) from 35-48 of the Proclamation Number 649/2009 of the Ethiopian Federal Government Procurement and Property Administration Proclamation, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. • Open Advertising of the procurement opportunity at the national level; • The procurement is open to eligible firms from any country; • The request for bids/Proposal documents shall require that bidders/proposers submitting Bids/Proposal present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the bank’s right to sanction and the Bank’s inspection and audit right; • Contracts with an appropriate allocation of responsibilities, risks and liabilities; • Application of Standstill period and Publication of contract award information; • Maintenance of records of the procurement process; and • The Bank has the right to review procurement documentation and activities. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement plan; Works: is applicable for those contracts identified in the Procurement Plan. Other Relevant Procurement Information. PROCUREMENT Eastern Africa : Africa CDC Regional Investment Financing Project PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2020-02-24 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167916 GPN Date: 2019-08-27 Project Name: Africa CDC Regional Investment Financing Project Loan / Credit No: IDA / 65040, IDA / 65030 M Executing Agency(ies): inistry of Health WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ZM-MOH-139096-CW-RFB / Construction of Four Storey Laboratory Complex, Office Pending Single Stage - One 19,407,600.0 2023-12- complex and ancillary IDA / 65030 Public Health Assets Post Request for Bids Open - International 0.00 Implementat 2021-11-15 2022-01-31 2022-01-31 2021-11-20 2022-04-11 2022-05-11 2022-06-15 Envelope 0 07 Building, Road works and ion drainage and parking for ZNPHI/RCC GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOH-139092-GO-RFQ / Pending Request for Single Stage - One Procurement of Office IDA / 65030 Project Management Post Limited 10,000.00 0.00 Implementati 2020-11-29 2021-01-24 2021-07-23 Quotations Envelope Equipment on ZM-MOH-186753-GO-RFQ / Pending Request for Single Stage - One Procurement of Bicycles for IDA / 65030 Public Health Assets Post Limited 17,000.00 0.00 Implementati 2020-11-24 2021-01-19 2021-07-18 Quotations Envelope community volunteers on ZM-MOH-186758-GO-RFQ / Pending Request for Single Stage - One Procurement of Furniture for IDA / 65030 Project Management Post Limited 10,000.00 0.00 Implementati 2020-11-21 2021-01-16 2021-07-15 Quotations Envelope the PIU on ZM-MOH-139012-GO-UN / Pending UN Agencies Procurement of ten (10) motor IDA / 65040 Public Health Assets Post Direct 605,000.00 0.00 Implementati 2021-01-04 2021-01-09 2021-02-13 2021-08-12 (Direct) vehicles on ZM-MOH-139045-GO-RFQ / Under Procurement of ECHO Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 44,417.00 0.00 Implementati 2021-01-23 2021-03-20 2021-09-16 Equipment for Laboratories in Quotations Envelope on Provinces and Districts. Pending ZM-MOH-139067-GO-RFB / Single Stage - One IDA / 65030 Public Health Assets Post Request for Bids Open - National 117,000.00 0.00 Implementati 2020-12-01 2020-12-06 2021-01-17 2021-02-16 2021-03-23 2021-09-19 Procurement of EBS Tools Envelope on ZM-MOH-176274-GO-RFQ / Pending Request for Single Stage - One Procurement of IDA / 65030 Public Health Assets Post Limited 7,950.00 0.00 Implementati 2021-01-16 2021-03-13 2021-09-09 Quotations Envelope Communication Equipment on ZM-MOH-139021-GO-RFQ / Pending Procurement of Equipment for Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 22,685.00 0.00 Implementati 2021-06-26 2021-08-21 2022-02-17 two (2) Sentinel Surveillance Quotations Envelope on Sites ZM-MOH-139015-GO-RFQ / Pending Procurement of Tools and Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 48,000.00 0.00 Implementati 2021-08-28 2021-10-23 2022-04-21 Equipment for the Point of Quotations Envelope on Entry ZM-MOH-139005-GO-RFB / Pending Single Stage - One Procurement of PHEOC IDA / 65030 Public Health Assets Post Request for Bids Open - International 550,000.00 0.00 Implementati 2021-05-10 2021-05-15 2021-06-26 2021-07-26 2021-08-30 2022-02-26 Envelope Equipment on ZM-MOH-139071-GO-RFB / Under Single Stage - One Procurement of equipment for IDA / 65030 Public Health Assets Post Request for Bids Open - International 428,520.00 0.00 Implementati 2021-02-15 2021-04-06 2021-02-20 2021-04-03 2021-05-03 2021-06-07 2021-12-04 Envelope Sentinel Sites on ZM-MOH-139030-GO-RFQ / Procurement of Laboratory Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 17,000.00 0.00 Canceled 2021-01-23 2021-03-20 2021-09-16 Reagents stock for entrice Quotations Envelope disease surveillance sites ZM-MOH-176260-GO-RFQ / Procurement of Influenza Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 31,518.00 0.00 Canceled 2021-04-10 2021-06-05 2021-12-02 sample collection supplies for Quotations Envelope sentinel surveillance sites ZM-MOH-186751-GO-RFQ / Pending Procurement of Lab Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 2,250.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 Reagents/consumables for Quotations Envelope on Research ZM-MOH-176266-GO-RFQ / Pending Procurement of Laboratory Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 34,496.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 reagent stocks for enteric Quotations Envelope on disease surveillance sites ZM-MOH-139032-GO-RFB / Under Single Stage - One Procurement of Strategic IDA / 65030 Public Health Assets Post Request for Bids Open - International 313,890.00 0.00 Implementati 2021-06-14 2021-04-06 2021-06-19 2021-07-31 2021-08-30 2021-10-04 2022-04-02 Envelope Laboratory Reagents Stocks on NON CONSULTING SERVICES Page 1 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOH-139018-NC-RFQ / Pending Request for Single Stage - One Printing of point of entry IDA / 65030 Public Health Assets Post Limited 5,000.00 0.00 Implementati 2021-05-01 2021-06-26 2021-12-23 Quotations Envelope guidelines and SOPs on ZM-MOH-139027-NC-RFQ / Pending Printing of Epidemic Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 5,000.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Preparedness and Response Quotations Envelope on Guidlines ZM-MOH-139034-NC-RFQ / Printing of QMS materials, Pending Request for Single Stage - One Laboratory Quality Manuals, IDA / 65030 Public Health Assets Post Limited 54,125.00 0.00 Implementati 2021-07-24 2021-09-18 2022-03-17 Quotations Envelope Job Aids, SOPs and Laboratory on Handbooks ZM-MOH-139082-NC-RFQ / Pending Request for Single Stage - One Printing of One Health IDA / 65030 Public Health Assets Post Limited 12,215.00 0.00 Implementati 2021-07-11 2021-09-05 2022-03-04 Quotations Envelope Guidlines on Pending ZM-MOH-176271-NC-RFQ / Request for Single Stage - One IDA / 65030 Public Health Assets Post Limited 2,172.00 0.00 Implementati 2021-05-08 2021-07-03 2021-12-30 Printing of Legal Frameworks Quotations Envelope on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOH-139108-CS-QCBS / Design and Supervision and Management Consultant for the Construction of the four Quality And Cost- IDA / 65030 Public Health Assets Prior Open - International 3,800,000.00 0.00 Under Review 2020-12-01 2020-12-22 2021-02-04 2021-03-04 2021-04-03 2021-05-08 2021-06-12 2022-06-12 storey BSL 3 Laboratory, Based Selection Office Complex and ancillary buildings, and parking for ZNPHI/RCC. ZM-MOH-139349-CS-CQS / Consultant Consultancy services for the Governance, Advocacy, and Pending IDA / 65040 Post Qualification Open - National 100,000.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Development of a Legal Operational Frameworks Implementation Selection Framework ZM-MOH-139350-CS-CQS / Consultant Provision of consultancy Pending IDA / 65040 Project Management Post Qualification Open - National 9,387.00 0.00 2021-06-07 2021-06-28 2021-08-11 2021-09-10 2021-10-15 2022-04-13 services for the Development Implementation Selection of M&E Tools INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOH-161147-CS-INDV / Recruitment of a Project Individual Under Coordinator for the Africa IDA / 65040 Project Management Post Consultant Open 60,000.00 116,980.27 2020-04-13 2020-08-07 2020-06-01 2020-12-10 2020-06-22 2021-03-15 2020-07-27 2021-01-23 Implementation Centre for Disease Control Selection Project ZM-MOH-186783-CS-CDS / Recruitment and Retention of Individual Human Resources Under Head-Workforce Development IDA / 65030 Prior Consultant Direct 149,860.89 0.00 2020-08-17 2020-12-17 2020-08-27 2020-09-17 2020-10-22 2021-04-20 Development Implementation for Leadership and Technical Selection Expertise ZM-MOH-186769-CS-CDS / Recruitment and Retention of Individual Human Resources Under Head-Laboratory Systems and IDA / 65030 Prior Consultant Direct 149,860.89 0.00 2020-08-17 2020-12-24 2020-08-27 2021-02-02 2020-09-17 2021-02-28 2020-10-22 2021-04-20 Development Implementation Network Leadership and Selection Technical Expertise ZM-MOH-186793-CS-CDS / Recruitment and Retention of Individual Human Resources Under Head- Epidemic Preparedness IDA / 65030 Prior Consultant Direct 149,860.89 0.00 2020-08-17 2020-12-24 2020-08-27 2021-02-02 2020-09-17 2021-02-28 2020-10-22 2021-04-20 Development Implementation and Response Leadership and Selection Technical Expertise ZM-MOH-186779-CS-CDS / Recruitment and Retention of Individual Human Resources Head- Information Systems IDA / 65030 Prior Consultant Direct 149,860.89 0.00 Under Review 2020-08-17 2020-12-17 2020-08-27 2020-09-17 2020-10-22 2021-04-20 Development for Leadership and Technical Selection Expertise ZM-MOH-186762-CS-CDS / Individual Recruitment and Retention of Human Resources Under IDA / 65030 Prior Consultant Direct 248,032.89 0.00 2020-09-28 2020-12-24 2020-10-08 2021-02-02 2020-10-29 2021-02-28 2020-12-03 2021-06-01 Leadership and Technical Development Implementation Selection Expertise (Director ZNPHI) ZM-MOH-139344-CS-INDV / Consultancy services for the Individual Design Validation consultant IDA / 65030 Public Health Assets Prior Consultant Open 300,000.00 0.00 Under Review 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2021-09-12 (Quality Assurance) Selection Refrigeration and Air conditioning Engineer ZM-MOH-186775-CS-CDS / Recruitment and Retention of Individual Head-Surveillance and Human Resources Under IDA / 65030 Prior Consultant Direct 149,860.89 0.00 2020-08-17 2020-12-17 2020-08-27 2021-02-02 2020-09-17 2021-02-28 2020-10-22 2021-04-20 Disease Intelligence for Development Implementation Selection Leadership and Technical Expertise Page 2 ZM-MOH-139352-CS-CQS / Individual Consultancy services for the Pending IDA / 65040 Project Management Post Consultant Limited 7,929.00 0.00 2021-04-13 2021-04-18 2021-05-09 2021-06-13 2021-12-10 Development of Baseline Implementation Selection Survey Tools ZM-MOH-186795-CS-CDS / Recruitment and retention of Individual Human Resources Pending Head Public Health Research IDA / 65030 Post Consultant Direct 149,860.89 0.00 2021-08-09 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Development Implementation Leadership and Technical Selection Expert. ZM-MOH-139346-CS-INDV / Consultancy services for the Individual Under Design Validation consultant IDA / 65030 Public Health Assets Prior Consultant Open 300,000.00 0.00 2020-12-21 2021-03-14 2021-02-08 2021-03-01 2021-04-05 2021-10-02 Implementation (Quality Assurance) Electro Selection Mechanical Engineer. ZM-MOH-139340-CS-INDV / Consultancy services for the Individual Design Validation consultant IDA / 65030 Public Health Assets Prior Consultant Open 300,000.00 0.00 Under Review 2020-12-21 2021-02-08 2021-03-01 2021-04-05 2021-10-02 (Quality Assurance) Selection Laboratory and Medical Equipment Specialist ZM-MOH-139303-CS-INDV / Consultancy services for the Individual Design Validation consultant IDA / 65030 Public Health Assets Prior Consultant Open 300,000.00 0.00 Under Review 2020-12-21 2021-02-08 2021-03-01 2021-04-05 2021-10-02 (Quality Assurance) Selection Environmental Safeguards Specialist. ZM-MOH-139320-CS-INDV / Consultancy services for the Individual Design Validation consultant IDA / 65030 Public Health Assets Prior Consultant Open 300,000.00 0.00 Under Review 2020-12-21 2021-02-08 2021-03-01 2021-04-05 2021-10-02 (Quality Assurance) Selection Civil/Structural Engineer ZM-MOH-139338-CS-INDV / Consultancy services for the Individual Design Validation consultant IDA / 65030 Public Health Assets Prior Consultant Open 300,000.00 0.00 Under Review 2020-12-21 2021-02-08 2021-03-01 2021-04-05 2021-10-02 (Quality Assurance) Social Selection Safeguards Specialist. ZM-MOH-139341-CS-INDV / Individual Consultancy services for the Under IDA / 65030 Public Health Assets Prior Consultant Open 300,000.00 0.00 2020-12-21 2021-03-14 2021-02-08 2021-03-01 2021-04-05 2021-10-02 Design Validation consultant Implementation Selection (Quality Assurance) Architect ZM-MOH-139114-CS-INDV / Consultancy Services for the Individual Under Design Validation Consultant IDA / 65030 Public Health Assets Prior Consultant Open 300,000.00 0.00 2020-12-21 2021-03-14 2021-02-08 2021-03-01 2021-04-05 2021-10-02 Implementation (Quality Assurance) Infectious Selection Disease Specialist. ZM-MOH-202428-CS-CDS / Individual Under Recruitment of an Infectious IDA / 65030 Project Management Prior Consultant Direct 126,954.09 0.00 2020-11-23 2021-04-06 2020-12-03 2020-12-24 2021-01-28 2021-07-27 Implementation Disease Specialist Selection ZM-MOH-202432-CS-CDS / Individual Under Recruitment of a Monitoring IDA / 65030 Project Management Prior Consultant Direct 71,265.60 0.00 2020-11-23 2021-01-25 2020-12-03 2021-02-26 2020-12-24 2021-02-28 2021-01-28 2021-07-27 Implementation and Evaluation Officer Selection ZM-MOH-202434-CS-CDS / Individual Under Recruitment of a Procurement IDA / 65030 Project Management Prior Consultant Direct 71,265.60 0.00 2020-11-23 2020-12-16 2020-12-03 2021-02-02 2020-12-24 2021-02-28 2021-01-28 2021-07-27 Implementation Officer Selection Individual ZM-MOH-202436-CS-CDS / Under IDA / 65030 Project Management Prior Consultant Direct 71,265.60 0.00 2020-11-23 2021-01-25 2020-12-03 2021-02-26 2020-12-24 2021-02-28 2021-01-28 2021-07-27 Recruitment of an Accountant Implementation Selection ZM-MOH-202430-CS-CDS / Individual Under Recruitment of a Public Health IDA / 65030 Project Management Prior Consultant Direct 126,954.09 0.00 2020-11-23 2021-03-26 2020-12-03 2020-12-24 2021-01-28 2021-07-27 Implementation Specialist Selection ZM-MOH-202433-CS-CDS / Individual Under Recruitment of an Internal IDA / 65030 Project Management Prior Consultant Direct 71,265.60 0.00 2020-11-23 2021-01-25 2020-12-03 2021-02-26 2020-12-24 2021-02-28 2021-01-28 2021-07-27 Implementation Auditor Selection ZM-MOH-218315-CS-CDS / Individual Recruitment of an IDA / 65030 Project Management Post Consultant Open 126,954.09 0.00 Canceled 2021-02-28 2021-02-11 2021-04-18 2021-05-09 2021-06-13 2021-12-10 Environment and Social Selection Safeguards Specialist ZM-MOH-220876-CS-INDV / Individual Under RECRUITMENT OF A SOCIAL IDA / 65030 Project Management Prior Consultant Direct 126,954.09 0.00 2021-03-08 2021-06-01 2021-03-18 2021-04-08 2021-05-13 2021-11-09 Implementation SAFEGUARDS SPECIALIST Selection ZM-MOH-218308-CS-CQS / Individual Pending Recruitment of a Civil IDA / 65030 Project Management Post Consultant Open 126,954.09 0.00 2021-03-31 2021-05-19 2021-06-09 2021-07-14 2022-01-10 Implementation Engineer for ACDCP Selection ZM-MOH-218314-CS-CDS / Individual Recruitment of Human Pending IDA / 65030 Project Management Post Consultant Direct 71,265.60 0.00 2021-03-31 2021-04-10 2021-05-01 2021-06-05 2021-12-02 Resource and Administration Implementation Selection officer ZM-MOH-218305-CS-CDS / Individual Human Resources Pending Recruitment of a Laboratory IDA / 65030 Post Consultant Direct 126,954.09 0.00 2021-03-31 2021-04-10 2021-05-01 2021-06-05 2021-12-02 Development Implementation Specialist Selection Individual ZM-MOH-218307-CS-CQS / IDA / 65030 Project Management Post Consultant Open 126,954.09 0.00 Under Review 2021-03-31 2021-05-24 2021-05-19 2021-06-09 2021-07-14 2022-01-10 Recruitment of an Architect Selection ZM-MOH-218306-CS-CDS / Individual Human Resources Under Recruitment of One Health IDA / 65030 Prior Consultant Direct 126,954.09 0.00 2021-03-31 2021-04-16 2021-04-10 2021-05-01 2021-06-05 2021-12-02 Development Implementation Specialist Selection Page 3 ZM-MOH-218310-CS-CQS / Individual Under Recruitment of a Financial IDA / 65030 Project Management Post Consultant Open 126,954.09 0.00 2021-03-31 2021-05-24 2021-05-19 2021-06-09 2021-07-14 2022-01-10 Implementation Management Specialist Selection ZM-MOH-218312-CS-CQS / Individual Under Recruitment of a Procurement IDA / 65030 Project Management Post Consultant Open 126,954.09 0.00 2021-03-31 2021-05-24 2021-05-19 2021-06-09 2021-07-14 2022-01-10 Implementation Specialist Selection ZM-MOH-236033-CS-INDV / Individual Recruitment of an Internal IDA / 65030 Project Management Post Consultant Open 126,954.09 0.00 Canceled 2021-06-07 2021-05-28 2021-07-26 2021-08-16 2021-09-20 2022-03-19 Auditor (Specialist) Selection Page 4 MINISTRY OF AGRICULTURE SMALLHOLDER AGRICULTURE TRANSFORMATION AND AGRIBUSINESS REVITALIZATION PROJECT (STAR-P) PROJECT PREPARATION ADVANCE (PPA) SUMMARIZED PROCUREMENT PLAN FOR 18 MONTHS Project information: Smallholder Agriculture Transformation and Agribusiness Revitalization Project P160945 Project Implementation agency: Ministry of Agriculture Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1, 2017- December 31, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 1, 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the Smallholder agriculture Transformation and Agribusiness Revitalization Project (STAR-P): Thresholds*, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Open Competition All contracts at or above USD 1 Works C ≥ 5,000,000 International Market 5,000,000 are subject to Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Approach and Direct international advertising and Contracting the use of the Bank’s SPDs (or other documents agreed with the Bank). Open Competition National Market 200,000 < C < 5,000,000 None Approach C ≤ 200,000 RfQ None All contracts at or above USD Open Competition 500,000 are subject to International Market international advertising and C ≥ 500,000 Approach and Direct the use of the Bank’s SPDs (or Goods, IT and Contracting other documents agreed with 2 non-consulting the Bank). services Open Competition 100,000 < C < 500,000 National Market None Approach C ≤ 100,000 RfQ None All contracts at or above USD 100,000 are subject to for international advertising and C < 100,000 Consulting Services the use of the Bank’s SPDs (or National other documents agreed with shortlist for the Bank). 3 selection of All contracts at or above USD consultant firms for 200,000 are subject to Engineering and international advertising and C ≤ 200,000 Construction the use of the Bank’s SPDs (or Supervision other documents agreed with the Bank). Selection of All values ≥ 100,000 4 Individual All Approaches consultants Training, Based on approved Workshops, This line activity is not subject 5 All Values Annual Work Plan & Study Tours to Procurement Review. Budgets (AWPB) by TTL *These thresholds are for the purposes of the initial procurement plan for the PPA and for first 18 months. The thresholds will be revised periodically based on re- assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The Cheesemanburg Landfill & Urban Sanitation Program team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Works There are no works under the Project Preparation Advance Goods and Non Consulting Services There are no goods and non-consulting services under the Project Preparation Advance Consultancy Services 1 2 3 4 5 6 7 8 9 Ref. Description Estimated Selection Review Expected Expected Expected Commen No. of Cost Method/ by Bank date of Contract Completi ts Assignment US$ Arrangem (Prior / proposal Signature on ent Post) submissio Date Date n 1. Baseline Study 120,000.00 CQS Prior 5-Oct-17 8-Dec-17 12-Jan- - for STAR-P 18 (firm) 2. Capacity 15,000.00 ICS Post NA 25-Sept- 31-Oct- - assessment 17 17 and support identification for Farmer cooperatives on selected value chains (firm/individua l) 3. Feasibility 58,000.00 ICS Prior NA 2-Oct-17 7-Nov-17 - study & mapping of SMEs 4. Capacity 35,000.00 ICS Prior NA 4-Oct-17 2-Nov-17 - Assessment and support identification for agribusinesses Institutions (firm/individua l) 5. Environmental 18,000.00 ICS Post NA 13-Sept- 12-Oct- - Safeguard 17 17 assessments( ESMF) (individual) 6. Environmental 18,000.00 ICS Post NA 13-Oct-17 13-Nov- - Safeguard 17 (individual) assessments( RPF) (individual) 7. Gender 15,000.00 ICS Post NA 23-Oct-17 28-Nov- - Analysis 17 (individual) 8. Economic 35,000.00 ICS Post NA 15-Oct-17 22-Nov- - analysis and 17 cost tables preparation (individual) 9. Preparation of 30,000.00 ICS Post NA 25-Sept- 1-Nov-17 - Project 17 document (individual) 10. PMU Director 30,600.00 SSS Prior NA 25-Sept- 29-Dec- - 17 18 11. Project 81,000.00 SSS Prior NA 25-Sept- 29-Dec- - Coordinator 17 18 12. M&E 54,000.00 SSS Prior NA 25-Sept- 29-Dec- - Officer/Value 17 18 Chain Development Specialist 13. Procurement 70,200.00 SSS Prior NA 25-Sept- 29-Dec- - Specialist 17 18 14. Project 54,000.00 SSS Prior NA 25-Sept- 29-Dec- - Accountant 17 18 15. Driver 9,000.00 SSS Prior NA 25-Sept- 29-Dec- - 17 18 16. Safeguard 41,400.00 ICS Prior NA 25-Sept- 26-Dec- Officer 17 18 Training and Workshop (Training & Workshop activities are subject to TTL clearance). Estimate Ref. Estimate Expected d Training, workshop and study tours d Cost Training/workshop No. Duration (US$) Date (Days) 1. County Sensitization workshops (5 counties) 35,000.0 10 June 22, 2017 0 2. Validation workshop for Baseline studies 10,000.0 1 November 25, 2017 0 3. National Project Launch Workshop 30,000.0 0 1 July 16, 2017 4. Validation workshop for Gender Analysis 5,000.00 1 November 7, 2017 5. Validation workshop for Agribusinesses 5,000.00 1 October 5, 2017 6. Validation workshop for Farmer Cooperatives 5,000.00 1 October 26, 2017 7. Validation workshops for Stakeholders 10,000.0 1 November 15, 2018 0 8. Validation workshops for Diagnostics and SME 5,000.00 1 November 5, 2017 Mapping GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) the salaries of locally contracted support staff of the Project entities and units involved in Project implementation (excluding civil servants) and state contributions thereon; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance and insurance; (iv) communication technology (including, without limitation, internet and telephone) and maintenance of equipment; (v) rental expenses and utilities; (vi) building security and maintenance; (vii) translations services, photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. PROCUREMENT Liberia : Smallholder Agriculture Transformation and Agribusiness Revitalization Project (STAR-P) PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2017-10-12 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160945 GPN Date: Project Name: Smallholder Agriculture Transformation and Agribusiness Revitalization Project (STAR-P) Loan / Credit No: IDA / V1230, / , IDA / 63600 Program Management Unit- Ministry of Agriculture Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Project Management, LR-PMU-MOA-176020-CW- Under Monitoring and Evaluation, Request for Single Stage - One 2021-01- RFQ / Rehabilitation of MOA IDA / 63600 Post Limited 250,000.00 0.00 Implementat 2020-06-02 2020-06-15 2020-07-28 Citizens Engagement and Quotations Envelope 24 storage/Warehouses ion Contigency Emergency GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-PMU-MOA-158489-GO- Pending RFB / Supply of Office Enhancing Productivity and Single Stage - One IDA / 63600 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2020-02-15 2020-02-20 2020-04-02 2020-05-02 2020-06-06 2020-12-03 Equipment, Office Furniture Competitiveness Envelope on and Stationery & Supplies Project Management, LR-PMU-MOA-158500-GO- Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 40,500.00 33,750.00 Signed 2020-02-22 2020-02-24 2020-04-18 2020-05-13 2020-10-15 RFQ / Supply of Motor Bikes Citizens Engagement and Quotations Envelope Contigency Emergency LR-PMU-MOA-158515-GO- Project Management, RFQ / Procurement of Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 3,500.00 4,725.00 Completed 2020-02-27 2020-05-24 2020-04-23 2020-07-01 2020-10-20 2020-12-16 specialized M&E Equipment Citizens Engagement and Quotations Envelope for data collection Contigency Emergency LR-PMU-MOA-158518-GO- Project Management, Pending RFQ / Supply of Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 5,000.00 0.00 Implementati 2020-03-18 2020-05-13 2020-11-09 Communication equipment Citizens Engagement and Quotations Envelope on and MOA website upgrade Contigency Emergency LR-PMU-MOA-159676-GO- Enhancing Productivity and Request for Single Stage - One IDA / 63600 Post Limited 413,000.00 405,700.00 Signed 2020-02-24 2020-02-25 2020-04-20 2020-05-04 2020-10-17 2020-06-22 RFQ / Supply of Vehicles Competitiveness Quotations Envelope LR-PMU-MOA-166198-GO- Enhancing Productivity and Request for Single Stage - One RFQ / Supply of SUV Jeep to IDA / 63600 Post Limited 50,000.00 49,750.00 Signed 2020-03-30 2020-03-25 2020-05-25 2020-04-22 2020-11-21 Competitiveness Quotations Envelope the STAR-P LR-PMU-MOA-170874-GO- DIR / Purchase and distribution of fruit and Project Management, vegetable seeds and seedlings Monitoring and Evaluation, IDA / 63600 Post Direct Selection Direct 50,000.00 49,939.00 Signed 2020-05-18 2020-05-16 2020-05-23 2020-08-03 2020-06-27 2020-09-18 2020-12-24 for urban households and Citizens Engagement and communities for the “Corona Contigency Emergency Victory Gardens” Scheme - CERC MOA LR-PMU-MOA-170889-GO- Project Management, RFQ / Office Equipment and Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 177,600.00 150,335.00 Completed 2020-05-12 2020-06-10 2020-07-07 2020-07-21 2021-01-03 2020-11-25 Logistics (Transportation) - Citizens Engagement and Quotations Envelope CERC MOA Contigency Emergency LR-PMU-MOA-171054-GO- RFQ / Procurement of Agro- processing equipment and Project Management, Under machinery to support post- Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 1,000,000.00 0.00 Implementati 2020-05-21 2020-06-25 2020-07-16 2021-01-12 harvest handling/losses Citizens Engagement and Quotations Envelope on (threshing, windowing, drying, Contigency Emergency de-stoning, seed-sorting and bagging) LR-PMU-MOA-171072-GO- Project Management, Under DIR / Procurement of 5 Monitoring and Evaluation, IDA / 63600 Post Direct Selection Direct 17,500.00 37,650.00 Implementati 2020-05-19 2020-05-26 2020-05-24 2020-05-28 2020-06-28 2020-12-25 motorcycles for extension Citizens Engagement and on workers - CERC-STARP Contigency Emergency Project Management, LR-PMU-MOA-171077-GO- Monitoring and Evaluation, DIR / Purchase of vehicle - IDA / 63600 Post Direct Selection Direct 37,500.00 37,650.00 Signed 2020-05-08 2020-05-26 2020-05-13 2020-05-28 2020-06-17 2020-06-05 2020-12-14 Citizens Engagement and CERC STAR-P Contigency Emergency LR-PMU-MOA-174454-GO- RFQ / Procure & distribute Project Management, production inputs Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 400,000.00 340,752.00 Completed 2020-05-24 2020-06-05 2020-07-19 2020-07-21 2021-01-15 2021-01-21 (fertilizers,pesticides,herbicid Citizens Engagement and Quotations Envelope es, compost, mulch, etc.) - Contigency Emergency CERC MOA LR-PMU-MOA-175158-GO- Project Management, RFQ / Purchase of certified Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 156,250.00 187,500.00 Signed 2020-05-27 2020-06-22 2020-07-22 2020-07-24 2021-01-18 Seed Rice (25kg) -CERC- Citizens Engagement and Quotations Envelope STARP Contigency Emergency LR-PMU-MOA-170884-GO- Project Management, RFQ / Supply of Medical Monitoring and Evaluation, Request for Single Stage - One equipment and IDA / 63600 Post Limited 95,000.00 294,437.50 Signed 2020-05-20 2020-06-29 2020-07-15 2020-07-21 2021-01-11 Citizens Engagement and Quotations Envelope supplies/protective gear for Contigency Emergency farmers - CERC MOA Page 1 LR-PMU-MOA-171075-GO- RFQ / Procurement of safety Project Management, gears to prevent farmers from Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 100,000.00 149,025.00 Signed 2020-05-20 2020-05-29 2020-07-15 2020-07-21 2021-01-11 contacting COVID 19 while Citizens Engagement and Quotations Envelope cultivating their corps - CERC- Contigency Emergency STARP LR-PMU-MOA-176005-GO- Project Management, RFQ / Purchase of 750MT Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 375,000.00 378,000.00 Signed 2020-06-02 2020-06-15 2020-07-28 2020-08-19 2021-01-24 Cassava scheme for Gari Citizens Engagement and Quotations Envelope production Contigency Emergency Project Management, LR-PMU-MOA-176008-GO- Pending Monitoring and Evaluation, Request for Single Stage - One RFQ / Purchase of 750MT Rice IDA / 63600 Post Limited 650,000.00 0.00 Implementati 2020-06-02 2020-07-28 2021-01-24 Citizens Engagement and Quotations Envelope scheme for farmers on Contigency Emergency LR-PMU-MOA-176011-GO- Project Management, RFQ / Purchase of 400MT of Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 350,000.00 360,000.00 Signed 2020-06-02 2020-06-15 2020-07-28 2020-08-19 2021-01-24 cassava scheme for fufu flour Citizens Engagement and Quotations Envelope production Contigency Emergency LR-PMU-MOA-176014-GO- Project Management, RFQ / Purchase of 400MT of Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 350,000.00 356,400.00 Signed 2020-06-02 2020-06-15 2020-07-28 2020-08-19 2021-01-24 cassava scheme for “Deepah” Citizens Engagement and Quotations Envelope production Contigency Emergency Project Management, LR-PMU-MOA-176017-GO- Pending Monitoring and Evaluation, Request for Single Stage - One RFQ / Purchase of 264.71MT IDA / 63600 Post Limited 225,000.00 0.00 Implementati 2020-06-02 2020-07-28 2021-01-24 Citizens Engagement and Quotations Envelope of local Beans (pulses) scheme on Contigency Emergency Project Management, LR-PMU-MOA-176100-GO- Pending Monitoring and Evaluation, Request for Single Stage - One RFQ / Purchase of 250MT IDA / 63600 Post Limited 125,000.00 0.00 Implementati 2020-06-02 2020-07-28 2021-01-24 Citizens Engagement and Quotations Envelope cassava planting materials on Contigency Emergency Project Management, LR-PMU-MOA-176102-GO- Pending Monitoring and Evaluation, Request for Single Stage - One RFQ / Purchase of 350MT of IDA / 63600 Post Limited 350,000.00 0.00 Implementati 2020-06-02 2020-07-28 2021-01-24 Citizens Engagement and Quotations Envelope Palm oil scheme on Contigency Emergency LR-PMU-MOA-180814-GO- Project Management, Under RFQ / Procurement of Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 150,000.00 0.00 Implementati 2020-06-23 2021-03-04 2020-08-18 2021-02-14 vegetable seeds to be planted Citizens Engagement and Quotations Envelope on on 500Ha land Contigency Emergency Project Management, LR-PMU-MOA-180818-GO- Monitoring and Evaluation, Request for Single Stage - One RFQ / Procurement of Oil IDA / 63600 Post Limited 375,000.00 241,500.00 Signed 2020-06-23 2020-06-23 2020-08-18 2020-07-24 2021-02-14 Citizens Engagement and Quotations Envelope Palm Seedling for 500Ha land Contigency Emergency LR-PMU-MOA-200675-GO- Project Management, RFQ / Supply of 2 pickups for Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 74,000.00 79,450.00 Completed 2020-10-28 2020-11-06 2020-12-23 2020-12-09 2021-06-21 2021-03-03 use by the MOA on CERC Citizens Engagement and Quotations Envelope activities implementation Contigency Emergency LR-PMU-MOA-205523-GO- Project Management, Pending RFQ / Supply of Digital Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 25,000.00 0.00 Implementati 2020-11-24 2021-01-19 2021-07-18 Communications, equipment Citizens Engagement and Quotations Envelope on devices under STARP-CERC Contigency Emergency LR-PMU-MOA-211452-GO- Project Management, RFQ / Supply of Office Monitoring and Evaluation, Request for Single Stage - One Equipment, Furniture and IDA / 63600 Post Limited 120,000.00 124,035.00 Signed 2020-12-29 2020-12-29 2021-02-23 2021-02-09 2021-08-22 Citizens Engagement and Quotations Envelope Supplies for the STAR-P and Contigency Emergency National stakeholders Project Management, LR-PMU-MOA-228895-GO- Pending Monitoring and Evaluation, Request for Single Stage - One RFQ / Supply of Farming Tool IDA / 63600 Post Limited 90,000.00 0.00 Implementati 2021-04-17 2021-06-12 2021-12-09 Citizens Engagement and Quotations Envelope to the MOA on Contigency Emergency NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-PMU-MOA-171289-NC- Project Management, Pending RFQ / Vehicle rental for seed Monitoring and Evaluation, Request for Single Stage - One IDA / 63600 Post Limited 10,000.00 0.00 Implementati 2020-05-13 2020-07-08 2021-01-04 distribution to local farmers - Citizens Engagement and Quotations Envelope on CERC STAR-P Contigency Emergency CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Management, LR-PMU-MOA-32933-CS- Consultant Monitoring and Evaluation, CQS / Baseline study for STAR- IDA / V1230 Post Qualification Open - National 120,000.00 116,485.00 Signed 2017-08-29 2017-08-29 2017-09-04 2017-10-18 2017-12-27 2017-11-17 2018-01-15 2017-12-22 2018-01-15 2018-06-20 Citizens Engagement and P Selection Contigency Emergency Project Management, LR-PMU-MOA-75198-CS- Consultant Monitoring and Evaluation, CQS / External Financial Audit IDA / V1230 Post Qualification Limited 20,000.00 20,000.00 Signed 2018-09-03 2018-05-30 2018-09-17 2018-08-02 2018-10-17 2018-09-17 2018-11-21 2018-09-25 2019-05-20 Citizens Engagement and on PPA Selection Contigency Emergency LR-PMU-MOA-111063-CS- Project Management, CQS / Recruitment of a Firm Monitoring and Evaluation, Quality And Cost- IDA / 63600 Post Open - International 500,000.00 0.00 Canceled 2019-04-26 2019-04-30 2019-05-17 2019-06-30 2019-07-28 2019-08-27 2019-10-01 2019-11-05 2020-11-04 to roll-out Communication Citizens Engagement and Based Selection Strategy for STAR-P Contigency Emergency Page 2 LR-PMU-MOA-111062-CS- Project Management, CQS / Recruitment of Funds Monitoring and Evaluation, Quality And Cost- IDA / 63600 Prior Open - International 2,000,000.00 0.00 Canceled 2019-04-26 2019-04-30 2019-05-17 2019-06-30 2019-07-28 2019-08-27 2019-10-01 2019-11-05 2020-11-04 Manager (Matching Grants Citizens Engagement and Based Selection Firm) Contigency Emergency LR-PMU-MOA-114651-CS- Project Management, QCBS / Recruitment of Funds Monitoring and Evaluation, Quality And Cost- IDA / 63600 Prior Open - International 2,000,000.00 2,964,000.00 Signed 2019-05-13 2019-07-18 2019-05-15 2019-09-05 2019-06-28 2020-03-30 2019-07-26 2020-09-26 2019-08-25 2020-11-17 2019-09-29 2021-03-26 2019-11-03 2021-04-06 2020-11-02 Manager (Matching Grants Citizens Engagement and Based Selection Firm) Contigency Emergency LR-PMU-MOA-114652-CS- Project Management, QCBS / Recruitment of a Firm Monitoring and Evaluation, Quality And Cost- Under IDA / 63600 Post Open - International 500,000.00 751,646.00 2019-05-13 2019-05-28 2019-05-15 2019-08-09 2019-06-28 2020-02-07 2019-07-26 2020-03-31 2019-08-25 2020-06-01 2019-09-29 2020-10-05 2019-11-03 2020-11-02 to roll-out Communication Citizens Engagement and Based Selection Implementation Strategy for STAR-P Contigency Emergency Project Management, Consultant LR-PMU-MOA-159680-CS- Monitoring and Evaluation, Pending IDA / 63600 Post Qualification Open - National 16,500.00 0.00 2020-03-24 2020-04-14 2020-05-28 2020-06-27 2020-08-01 2021-01-28 CQS / Audit of the STAR-P Citizens Engagement and Implementation Selection Contigency Emergency LR-PMU-MOA-170607-CS- Project Management, UN / CERC – MOA Technical Monitoring and Evaluation, UN Agencies IDA / 63600 Post Direct 5,000,000.00 5,000,000.00 Signed 2020-06-13 2020-05-18 2020-12-10 Assistance Agreement with Citizens Engagement and (Direct) WFP Contigency Emergency INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Management, LR-PMU-MOA-31202-CS- Monitoring and Evaluation, CDS / Recruitment of PMU IDA / V1230 Prior Direct Selection Direct 30,600.00 0.00 Canceled 2017-10-23 2018-12-03 2017-11-02 2018-01-06 2018-07-05 Citizens Engagement and Director Contigency Emergency LR-PMU-MOA-31196-CS- CDS / Recruitment of Project IDA / V1230 Prior Direct Selection Direct 81,000.00 0.00 Canceled 2017-10-05 2017-10-13 2017-10-15 2017-10-18 2017-12-19 2018-06-17 Coordinator LR-PMU-MOA-31205-CS- CDS / Recruitment of / Prior Direct Selection Direct 54,000.00 0.00 Canceled 2017-10-05 2017-10-13 2017-10-15 2017-10-19 2017-12-19 2018-06-17 Monitoring & Evaluation Officer LR-PMU-MOA-31206-CS- CDS / Recruitment of IDA / V1230 Prior Direct Selection Direct 70,200.00 0.00 Canceled 2017-10-05 2017-10-26 2017-10-15 2017-12-19 2018-06-17 Procurement Officer LR-PMU-MOA-31200-CS- CDS / Recruitment of Project IDA / V1230 Prior Direct Selection Direct 54,000.00 0.00 Canceled 2017-10-05 2017-11-02 2017-10-15 2017-11-03 2017-12-19 2018-06-17 Accountant LR-PMU-MOA-31203-CS- Individual INDV / Recruitment of / Post Consultant Limited 41,400.00 0.00 Canceled 2017-10-28 2017-10-12 2017-11-02 2017-10-12 2017-11-23 2017-12-28 2018-06-26 Safeguard Officer Selection Project Management, LR-PMU-MOA-32941-CS- Individual Monitoring and Evaluation, Under INDV / Economic analysis and IDA / V1230 Post Consultant Open 35,000.00 0.00 2018-02-15 2018-05-17 2018-04-05 2018-04-26 2018-05-31 2018-11-27 Citizens Engagement and Implementation cost tables preparation Selection Contigency Emergency LR-PMU-MOA-32920-CS- Individual Under INDV / Environmental / Post Consultant Open 18,000.00 0.00 2017-10-03 2017-10-03 2017-11-10 2018-01-12 2017-12-01 2018-02-20 2018-01-05 2018-07-04 Implementation safeguard assessments (RPF) Selection LR-PMU-MOA-32923-CS- Project Management, INDV / Capacity assessment & Individual Monitoring and Evaluation, Under support idenification for IDA / V1230 Post Consultant Open 15,000.00 0.00 2017-11-20 2017-12-29 2018-01-08 2018-01-29 2018-03-05 2018-09-01 Citizens Engagement and Implementation famer cooperatives on Selection Contigency Emergency selective value chains Project Management, LR-PMU-MOA-32931-CS- Individual Monitoring and Evaluation, INDV / Feasibility studies and IDA / V1230 Post Consultant Open 58,000.00 38,100.00 Signed 2017-12-15 2017-12-29 2018-02-02 2018-02-23 2018-02-23 2018-03-30 2018-05-25 2018-09-26 Citizens Engagement and mapping of SMEs Selection Contigency Emergency LR-PMU-MOA-32926-CS- Individual Under INDV / Environmental / Post Consultant Open 18,000.00 0.00 2017-09-09 2017-10-17 2017-11-07 2017-12-12 2018-06-10 Implementation safeguard assessments (ESMF) Selection Project Management, Individual LR-PMU-MOA-32935-CS- Monitoring and Evaluation, IDA / V1230 Post Consultant Open 15,000.00 18,600.00 Signed 2017-08-18 2017-08-15 2017-09-25 2018-01-26 2017-10-16 2018-02-01 2017-11-20 2018-02-15 2018-05-19 INDV / Gender anaylsis Citizens Engagement and Selection Contigency Emergency Project Management, LR-PMU-MOA-63194-CS- Individual Monitoring and Evaluation, INDV / Pest Management Plan IDA / V1230 Post Consultant Open 18,800.00 17,075.00 Signed 2018-05-17 2018-05-10 2018-07-05 2018-07-26 2018-05-24 2018-08-30 2018-05-25 2019-02-26 Citizens Engagement and (PMP) Selection Contigency Emergency LR-PMU-MOA-32925-CS- Individual INDV / Capacity assessment & / Post Consultant Open 35,000.00 0.00 Canceled 2017-12-15 2018-02-02 2018-02-23 2018-03-30 2018-09-26 support idenification for Selection agribusiness institutions Project Management, LR-PMU-MOA-78744-CS- Individual Monitoring and Evaluation, INDV / Horticulture Value IDA / V1230 Post Consultant Limited 15,000.00 24,660.00 Signed 2018-09-21 2018-10-24 2018-09-26 2018-10-10 2018-10-10 2018-11-09 2018-10-15 2018-11-12 2018-11-14 Citizens Engagement and Chain Study Selection Contigency Emergency Project Management, LR-PMU-MOA-78742-CS- Individual Monitoring and Evaluation, INDV / SME Diagnostics for IDA / V1230 Post Consultant Limited 20,000.00 13,000.00 Signed 2018-09-21 2018-09-25 2018-09-25 2018-09-21 2018-09-28 2018-10-19 2018-10-02 2018-10-19 2018-11-01 Citizens Engagement and STAR-P Selection Contigency Emergency Page 3 LR-PMU-MOA-78737-CS- Project Management, Individual INDV / Capacity Assessment Monitoring and Evaluation, IDA / V1230 Post Consultant Limited 20,000.00 0.00 Canceled 2018-11-21 2018-11-23 2018-11-25 2018-11-29 2018-12-29 and TOR Formulations Citizens Engagement and Selection M&E/MIS for STAR-P Contigency Emergency LR-PMU-MOA-86874-CS- Project Management, CDS / CAPACITY ASSESSMENT Monitoring and Evaluation, IDA / V1230 Post Direct Selection Direct 20,000.00 12,150.00 Signed 2018-11-02 2018-11-02 2018-11-12 2018-11-12 2019-01-16 2018-11-12 2019-02-07 OF TOR FORMULATION MIS & Citizens Engagement and M&E FOR STAR-P Contigency Emergency Project Management, LR-PMU-MOA-99520-CS- Individual Monitoring and Evaluation, INDV / Recruitment of Project IDA / V1230 Post Consultant Direct 81,000.00 4,500.00 Signed 2017-10-13 2017-10-13 2017-10-23 2017-10-23 2017-11-13 2017-11-13 2017-12-18 2017-10-01 2018-11-30 Citizens Engagement and Coordinator Selection Contigency Emergency Project Management, LR-PMU-MOA-99528-CS- Individual Monitoring and Evaluation, INDV / Recruitment of Project IDA / V1230 Post Consultant Direct 54,000.00 36,000.00 Signed 2017-11-02 2017-11-02 2017-11-12 2017-11-12 2017-12-03 2017-12-03 2018-01-01 2017-11-01 2018-11-30 Citizens Engagement and Accountant Selection Contigency Emergency Project Management, LR-PMU-MOA-99527-CS- Individual Monitoring and Evaluation, INDV / Recruitment of Project IDA / V1230 Post Consultant Direct 70,200.00 31,500.00 Signed 2017-10-26 2017-10-23 2017-11-05 2017-11-02 2017-11-26 2017-11-10 2017-12-31 2017-12-01 2018-11-30 Citizens Engagement and Procurement Officer Selection Contigency Emergency LR-PMU-MOA-99369-CS- Project Management, Individual INDV / Recruitment of Monitoring and Evaluation, IDA / V1230 Post Consultant Direct 30,600.00 30,600.00 Signed 2018-12-03 2019-02-01 2018-12-13 2019-01-03 2019-02-04 2019-02-07 2018-08-13 2019-09-30 Program Management Unit Citizens Engagement and Selection Director Contigency Emergency LR-PMU-MOA-99365-CS- Project Management, Individual INDV / Recruitment of Project Monitoring and Evaluation, IDA / V1230 Post Consultant Direct 54,000.00 36,000.00 Signed 2017-10-13 2017-10-13 2017-10-23 2017-10-23 2017-11-13 2017-11-13 2017-12-01 2017-11-30 2018-11-13 Monitoring & Evaluation Citizens Engagement and Selection Officer Contigency Emergency Project Management, LR-PMU-MOA-106952-CS- Individual Monitoring and Evaluation, Under INDV / Recruitment of IDA / 63600 Post Consultant Open 53,333.28 0.00 2019-04-01 2019-03-29 2019-05-20 2019-06-10 2019-07-15 2020-07-31 Citizens Engagement and Implementation Agronomist Selection Contigency Emergency Project Management, LR-PMU-MOA-106951-CS- Individual Monitoring and Evaluation, INDV / Recruitment of IDA / 63600 Post Consultant Open 46,666.56 72,000.00 Signed 2019-04-01 2019-03-29 2019-05-20 2019-08-15 2019-06-10 2019-09-26 2019-07-15 2019-11-01 2020-07-31 Citizens Engagement and Communication Officer Selection Contigency Emergency LR-PMU-MOA-106947-CS- Project Management, Individual INDV / Recruitment of Monitoring and Evaluation, IDA / 63600 Post Consultant Open 66,666.60 196,560.00 Signed 2019-04-01 2019-03-29 2019-05-20 2019-09-24 2019-06-10 2019-09-26 2019-07-15 2019-11-01 2020-07-31 Financial Management Citizens Engagement and Selection Specialist Contigency Emergency LR-PMU-MOA-106956-CS- Project Management, Individual INDV / Recruitment of Monitoring and Evaluation, IDA / 63600 Post Consultant Limited 39,600.00 0.00 Canceled 2019-04-01 2019-03-29 2019-04-06 2019-04-27 2019-06-01 2020-06-30 Monitoring & Evaluation Citizens Engagement and Selection Officer Contigency Emergency Project Management, LR-PMU-MOA-106946-CS- Individual Monitoring and Evaluation, INDV / Recruitment of Project IDA / 63600 Post Consultant Limited 73,333.32 0.00 Canceled 2019-04-01 2019-03-29 2019-04-06 2019-04-27 2019-06-01 2020-06-30 Citizens Engagement and Coordinator Selection Contigency Emergency LR-PMU-MOA-106950-CS- Project Management, Individual INDV / Recruitment of Value Monitoring and Evaluation, Under IDA / 63600 Post Consultant Open 86,666.64 0.00 2019-04-01 2019-03-29 2019-05-20 2019-06-10 2019-07-15 2020-07-31 Chain and Agribusiness Citizens Engagement and Implementation Selection Advisor Contigency Emergency Project Management, LR-PMU-MOA-106958-CS- Individual Monitoring and Evaluation, INDV / Recruitment of IDA / 63600 Post Consultant Limited 37,200.00 0.00 Canceled 2019-04-01 2019-04-01 2019-04-06 2019-04-27 2019-06-01 2020-06-30 Citizens Engagement and Procurement Officer Selection Contigency Emergency Project Management, LR-PMU-MOA-108712-CS- Individual Monitoring and Evaluation, INDV / Recruitment of IDA / 63600 Prior Consultant Limited 37,200.00 74,664.00 Signed 2019-04-02 2019-04-04 2019-04-08 2019-09-09 2019-04-29 2019-12-13 2019-06-03 2019-12-30 2020-06-30 Citizens Engagement and Procurement Officer Selection Contigency Emergency LR-PMU-MOA-145654-CS- Project Management, Individual INDV / Recruitment of Monitoring and Evaluation, IDA / 63600 Post Consultant Open 39,600.00 79,999.92 Signed 2019-03-29 2019-04-03 2019-05-17 2019-09-24 2019-06-07 2019-09-26 2019-07-12 2019-11-01 2021-02-28 Monitoring & Evaluation Citizens Engagement and Selection Officer Contigency Emergency Project Management, LR-PMU-MOA-145651-CS- Individual Monitoring and Evaluation, INDV / Recruitment of Project IDA / 63600 Post Consultant Open 73,333.32 120,000.00 Signed 2019-03-30 2019-04-03 2019-05-18 2019-08-29 2019-06-08 2019-09-24 2019-07-13 2019-11-01 2020-01-09 Citizens Engagement and Coordinator Selection Contigency Emergency LR-PMU-MOA-158481-CS- Project Management, Individual INDV / Recruitment of Monitoring and Evaluation, IDA / 63600 Prior Consultant Open 158,400.00 158,640.00 Under Review 2020-02-18 2020-02-24 2020-04-07 2020-10-18 2020-04-28 2021-01-15 2020-06-02 2021-02-15 2021-06-01 International Procurement Citizens Engagement and Selection Expert Contigency Emergency LR-PMU-MOA-158506-CS- Project Management, Individual INDV / Recruitment of Value Monitoring and Evaluation, Under IDA / 63600 Post Consultant Open 93,600.00 0.00 2020-02-19 2020-02-14 2020-04-08 2021-03-31 2020-04-29 2021-05-03 2020-06-03 2020-11-30 Chain and Agribusiness Citizens Engagement and Implementation Selection Advisor Contigency Emergency LR-PMU-MOA-158509-CS- Project Management, Individual INDV / Recruitment of Gender Monitoring and Evaluation, Under IDA / 63600 Post Consultant Open 67,200.00 0.00 2020-02-20 2020-02-14 2020-04-09 2021-04-07 2020-04-30 2021-05-04 2020-06-04 2022-06-02 & Social Development Citizens Engagement and Implementation Selection Specialist Contigency Emergency LR-PMU-MOA-158484-CS- Project Management, Individual INDV / Recruitment of Monitoring and Evaluation, Under IDA / 63600 Post Consultant Open 67,200.00 0.00 2020-02-21 2020-02-14 2020-04-10 2020-12-09 2020-05-01 2020-06-05 2022-06-03 Environmental & Social Citizens Engagement and Implementation Selection Safeguard Officer Contigency Emergency LR-PMU-MOA-158496-CS- Institutional Capacity Building Individual INDV / Individual consultancy and Strengthening Enabling Pending IDA / 63600 Post Consultant Limited 5,000.00 0.00 2020-03-15 2020-03-20 2020-04-10 2020-05-15 2020-11-11 to complete the preparation Environment for Farmers, Implementation Selection of the LACF Manual State, and non-State Actors Page 4 LR-PMU-MOA-158486-CS- Project Management, Individual INDV / Consultant Services to Monitoring and Evaluation, IDA / 63600 Post Consultant Limited 2,000.00 4,250.00 Signed 2020-03-25 2020-03-23 2020-03-30 2020-03-25 2020-04-20 2020-05-07 2020-05-25 2020-05-26 2020-11-21 Input backlog of Documents Citizens Engagement and Selection into TOMPRO Contigency Emergency Project Management, LR-PMU-MOA-165501-CS- Individual Monitoring and Evaluation, Under INDV / Training in Geographic IDA / 63600 Post Consultant Limited 10,000.00 0.00 2020-05-04 2020-05-12 2020-05-09 2020-05-30 2020-07-04 2020-12-31 Citizens Engagement and Implementation Information System (GIS) Selection Contigency Emergency LR-PMU-MOA-167485-CS- CDS / Direct Selection of Individual Consultant to Institutional Capacity Building conduct Capacity Assessment and Strengthening Enabling and Develop Training Modules IDA / 63600 Post Direct Selection Direct 15,000.00 15,070.00 Signed 2020-04-06 2020-04-07 2020-04-14 2020-04-16 2020-06-18 2020-04-24 2020-12-15 Environment for Farmers, for farmer groups in the Value State, and non-State Actors Chains of Oil Palm, Rice and Horticulture in Lofa and Nimba Counties, Liberia LR-PMU-MOA-167487-CS- CDS / Direct Selection of Individual Consultant to conduct Capacity Assessment Institutional Capacity Building and Develop Training Modules and Strengthening Enabling IDA / 63600 Post Direct Selection Direct 15,000.00 15,070.00 Signed 2020-04-06 2020-04-07 2020-04-16 2020-04-15 2020-06-20 2020-04-24 2020-12-17 for farmer groups in the Value Environment for Farmers, Chains of Oil Palm, Rice and State, and non-State Actors Horticulture in Grand Cape Mount, Bomi and Margibi Counties, Liberia LR-PMU-MOA-174126-CS- Project Management, CDS / Recruitment of Monitoring and Evaluation, Pending IDA / 63600 Post Direct Selection Direct 60,000.00 0.00 2020-05-18 2020-05-28 2020-08-01 2021-01-28 Partnership and Coordination Citizens Engagement and Implementation Consultant, PMU Contigency Emergency LR-PMU-MOA-174130-CS- Project Management, CDS / Recruitment of Finance, Monitoring and Evaluation, Investment and IDA / 63600 Post Direct Selection Direct 60,000.00 60,000.00 Signed 2020-05-18 2020-05-26 2020-05-28 2020-05-27 2020-08-01 2020-07-01 2021-01-28 Citizens Engagement and Commercialization Contigency Emergency Consultant, PMU LR-PMU-MOA-174131-CS- Project Management, CDS / Recruitment of Monitoring and Evaluation, Pending Implementation and IDA / 63600 Post Direct Selection Direct 60,000.00 0.00 2020-05-18 2020-05-28 2020-08-01 2021-01-28 Citizens Engagement and Implementation Development Consulltant, Contigency Emergency PMU LR-PMU-MOA-174467-CS- Project Management, INDV / Support the Individual Monitoring and Evaluation, Under development of curriculum for IDA / 63600 Post Consultant Limited 54,000.00 49,000.00 2020-05-22 2020-12-16 2020-05-27 2021-03-10 2020-06-17 2021-04-12 2020-07-22 2021-01-18 Citizens Engagement and Implementation farmer field schools - CERC- Selection Contigency Emergency STARP Project Management, LR-PMU-MOA-202362-CS- Individual Monitoring and Evaluation, Under INDV / Recruitment of Project IDA / 63600 Post Consultant Limited 39,600.00 0.00 2020-11-01 2020-11-18 2020-11-06 2021-04-27 2020-11-27 2021-01-01 2021-06-30 Citizens Engagement and Implementation Accountant for the STAR-P Selection Contigency Emergency LR-PMU-MOA-175627-CS- Project Management, INDV / Recruitment of an Individual Monitoring and Evaluation, individual consultant to review IDA / 63600 Post Consultant Limited 5,000.00 0.00 Canceled 2020-05-25 2020-05-27 2020-05-30 2020-06-20 2020-07-25 2021-01-21 Citizens Engagement and and complete the LACF Selection Contigency Emergency Manual LR-PMU-MOA-32937-CS- Individual INDV / Preparation of project / Post Consultant Open 30,000.00 0.00 Canceled 2018-03-15 2018-05-03 2018-05-24 2018-06-28 2018-12-25 document Selection Institutional Capacity Building LR-PMU-MOA-214927-CS- Individual and Strengthening Enabling Under INDV / Financial Management IDA / 63600 Post Consultant Limited 50,000.00 0.00 2021-01-19 2021-01-21 2021-01-24 2021-01-28 2021-02-14 2021-02-01 2021-03-21 2021-09-17 Environment for Farmers, Implementation Coordinator Selection State, and non-State Actors LR-PMU-MOA-214928-CS- Institutional Capacity Building Individual INDV / Agricultural and Strengthening Enabling Under IDA / 63600 Post Consultant Limited 50,000.00 0.00 2021-01-19 2021-01-21 2021-01-24 2021-02-14 2021-03-21 2021-09-17 Knowledge Management Environment for Farmers, Implementation Selection Specialist/Advisor State, and non-State Actors Institutional Capacity Building LR-PMU-MOA-214929-CS- Individual and Strengthening Enabling Under INDV / COMMUNICATIONS IDA / 63600 Post Consultant Limited 50,000.00 0.00 2021-01-19 2021-01-21 2021-01-24 2021-02-14 2021-03-21 2021-09-17 Environment for Farmers, Implementation AND MARKETING SPECIALIST Selection State, and non-State Actors Institutional Capacity Building LR-PMU-MOA-215180-CS- Individual and Strengthening Enabling Under INDV / SME/Agribusiness & IDA / 63600 Post Consultant Limited 67,200.00 0.00 2021-01-20 2021-01-26 2021-01-25 2021-02-15 2021-03-22 2021-09-18 Environment for Farmers, Implementation Capacity Building Consultant Selection State, and non-State Actors LR-PMU-MOA-218070-CS- Institutional Capacity Building INDV / Individual Consultancy Individual and Strengthening Enabling for the Conduct of a IDA / 63600 Post Consultant Limited 20,000.00 12,500.00 Signed 2021-02-05 2021-02-21 2021-02-10 2021-03-09 2021-03-03 2021-04-19 2021-04-07 2021-05-04 2021-10-04 Environment for Farmers, Study/Research on Climate Selection State, and non-State Actors smart agriculture in Liberia LR-PMU-MOA-218084-CS- INDV / Individual Consultancy Institutional Capacity Building Individual for Screening and Capacity and Strengthening Enabling Under IDA / 63600 Post Consultant Limited 10,000.00 0.00 2021-02-05 2021-02-22 2021-02-10 2021-03-09 2021-03-03 2021-03-25 2021-04-07 2021-10-04 Assessment of Agriculture Environment for Farmers, Implementation Selection Extension Service Providers in State, and non-State Actors Liberia LR-PMU-MOA-220983-CS- Institutional Capacity Building Individual INDV / National Strategy and and Strengthening Enabling Under IDA / 63600 Post Consultant Limited 9,400.00 0.00 2021-02-22 2021-02-25 2021-02-27 2021-03-26 2021-03-20 2021-04-24 2021-10-21 Action for Sustainable Oil Environment for Farmers, Implementation Selection Palm Production in Liberia State, and non-State Actors Page 5 LR-PMU-MOA-226630-CS- INDV / Individual Consultancy Project Management, Individual for the Conduct of Monitoring and Evaluation, Under IDA / 63600 Post Consultant Limited 2,000.00 0.00 2021-03-28 2021-03-29 2021-04-02 2021-04-23 2021-05-28 2021-11-24 Agricultural Journalism Citizens Engagement and Implementation Selection Training and Mentoring Contigency Emergency Support Project Management, LR-PMU-MOA-235763-CS- Individual Monitoring and Evaluation, INDV / Recruitment of IDA / 63600 Post Consultant Open 93,600.00 0.00 Canceled 2021-05-21 2021-07-09 2021-07-30 2021-09-03 2022-03-02 Citizens Engagement and Program Operations Officer Selection Contigency Emergency Page 6 REPUBLIQUE ISLAMIQUE DE MAURITANIE Honneur-fraternité-justice AUTORITE DE LA ZONE FRANCHE DE NOUADHIBOU PROJET D’ECOPOLE HALIEUTIQUE DE NOUADHIBOU PLAN DE PASSATION DES MARCHES Projet d’Eco pôle Halieutique de Nouadhibou (P151058), financement IDA I. GENERALITES : 1. Information sur le projet : Pays : Mauritanie Emprunteur : l’Etat Mauritanien Nom de projet : Projet d’Eco pôle Halieutique de Nouadhibou Numéro du Projet : P151058 Agence d’exécution du Projet : l’Autorité de la Zone Franche de Nouadhibou. 2. Date d’approbation du premier plan de passation des marchés par la Banque : Original : 19 janvier 2015 Révision : 3. Date de publication de l’avis général de la Passation des Marchés : 08/03/2016 4. Période couverte par le plan actuel : du 1er juillet 2016 au 31 décembre 2017 ; 5. Date d’approbation du PPM : 25/01/2016 6. Date d’approbation de la mise à jour : II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable: Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans l'Annexe 1 des Directives de passation de marchés : [seuils pour application des méthodes de passation de marchés (non limitées à la liste ci-dessous) seront déterminées par le Spécialiste en Passation des marchés / Personnel Accrédité en Passation de marchés sur la base de l'évaluation de la capacité de l'agence d’exécution] Méthode de Passation de Seuil choix de la Seuil de revue à marchés méthode en US$ priori en 1. ICB and LIB (Biens) Sup à 500,000 Tous 2. NCB (Biens) Inf ou egal 500,000 1 premier marché 3. ICB (Travaux) Sup 10 millions Tous 4. NCB (Travaux) Inf ou egal 10 1 premier marché millions 5. ICB (Services autres que Sup à 300,000 Tous Services de consultant) 6. NCB (Services autres que Inf ou egal 300,000 Services de consultant) 7. CF (Biens) Inf ou egal à 50,000 8. CF (Travaux) Inf ou egal à 100,000 9. Gré à Gré Sans seuil Tous les marchés 2. Pré-qualification Les soumissionnaires seront pré- qualifiés selon les dispositions des paragraphes 2.9 et 2.10 des Directives. Sans objet 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 3.17 des Directives : Sans objet 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Sans objet 5. Travaux: 1 2 3 4 5 6 7 Réf. Description Coût Méthode Revue de Date Commentair /No. des missions estimatif de la Banque prévue es sélection (à priori / de à soumissi posteriori) on des propositi ons 1 MR-PEPHAN- 1,800.00 Works- Post 2017/01/ 25577-CW- Request 17 RFQ / for Aménagemen Quotations t des bureaux (Envi et Assi- compt) 2 01-PAZF-AON- 700,000.0 Works- Prior 2016/11/ T-2016 / 0 Request 01 Travaux de for Bids construction et Equipment terminale frigorifique pour entreposage du fret a l’aéroport international de Nouadhibou 6. Biens et Services (autres que services de consultant) ; 1 2 3 4 5 6 7 Réf. Description Coût Méthode Revue de Date Commentair /No. des missions estimatif de la Banque prévue es sélection (à priori / de à soumissi posteriori) on des propositi ons 1 MR-PEPHAN- 12,000.00 Direct Prior 2015/09/ 25677-GO- Selection 17 DIR / Acquisition d’un logiciel TOMPRO pour l’UCP 2 MR-PEPHAN- 30,000.00 Direct Prior 2016/10/ 24481-GO- Selection 17 DIR / Réalisation de documents de communicatio n de l'étude de préfaisabilité du port en eaux profondes de Nouadhibou 3 MR-PEPHAN- 2,500.00 Direct Prior 2016/11/ 25678-GO- Selection 24 DIR / Acquisition d’un systeme de messagerie pour le compte du PEPHN 4 MR-PEPHAN- 4,200.00 Goods- Post 2017/02/ 24040-GO- Request 09 RFQ / Mobilier for de bureau et Quotations materiel informatique pour le bureau de Coordinateur Adjoint 5 MR-PEPHAN- 1,800.00 Works- Post 2017/01/ 25577-CW- Request 17 RFQ / for Aménagemen Quotations t des bureaux (Envi et Assi- compt) 6 MR-PEPHAN- 5,000.00 Goods- Post 2016/07/ 25700-GO- Request 15 RFQ / for Acquisition du Quotations materiel informatique pour la salle d'archive de la CPMC lot 1 7 MR-PEPHAN- 12,000.00 Goods- Post 2015/08/ 25697-GO- Request 18 RFQ / for Acquisition de Quotations mobilier de bureau au profit de l'UCP lot 2 8 02-PZF-F- 22,000.00 Goods- Post 2016/07/ 2016 / Request 15 Equipement for et refection Quotations de salle archive 9 MR-PEPHAN- 20,000.00 Goods- Post 2017/09/ 25692-GO- Request 21 RFQ / for Acquisition Quotations d'un vehicule forganette au profit de l'UCP 10 MR-PEPHAN- 8,000.00 Goods- Post 2015/05/ 24059-GO- Request 05 RFQ / for Acquisition de Quotations matériels informatiques pour la DGPSP 11 MR-PEPHAN- 16,000.00 Goods- Post 2015/09/ 24234-GO- Request 22 RFQ / for Souscription Quotations d’une police d’assurance maladie et risque accident pour le personnel cadre du projet et leurs familles 12 03-PAZF-F- 30,000.00 Goods- Post 2016/07/ 2016 / Request 15 Realisation for Site Internet Quotations dedie au Pole halieutique de nouadhibou 13 MR-PEPHAN- 15,000.00 Goods- Post 2015/08/ 24042-GO- Request 18 RFQ / for Acquisition de Quotations matériels et équipements informatiques pour les besoins de l'UCP lot 1 14 MR-PEPHAN- 3,000.00 Goods- Post 2016/11/ 24057-GO- Request 21 RFQ / for Elaborer d’ un Quotations dépliant/livret de présentation du projet 15 MR-PEPHAN- 45,000.00 Goods- Prior 2015/04/ 24069-GO- Request 28 RFQ / for Acquisition Quotations d’une solution GED 16 01-PAZF-F- 30,000.00 Goods- Post 2016/07/ 2016 / Request 15 Pomotion for emarketing Quotations recutement agence pour la realisation video promotionnell e 17 MR-PEPHAN- 24,000.00 Goods- Post 2015/10/ 24231-GO- Request 06 RFQ / for Acquisition Quotations d’équipement s de vidéoconfére nce pour l’UCP et l’ANZF 18 MR-PEPHAN- 21,000.00 Goods- Post 2017/04/ 24006-GO- Request 10 RFQ / for Aménagemen Quotations t Chapiteaux, plancher professionnel, équipements de son et éclairage 19 MR-PEPHAN- 90,000.00 Goods- Post 2017/11/ 24038-GO- Request 22 RFB / for Bids Production ,conception et impression de support de communicatio n et de promition pour la Vulgarisation des textes d'application de la stratégie du secteur des pêches 20 MR-PEPHAN- 57,000.00 Goods- Post 2017/09/ 25691-GO- Request 21 RFB / for Bids Acquisition de deux vehicules leger au profit de l'UCP 21 01-PAZF-AON- 700,000.0 Works- Prior 2016/11/ T-2016 / 0 Request 01 Travaux de for Bids construction et equipment terminale frigorifique pour entreposage du fret a l aroport international de Nouadhibou 22 MR-PEPHAN- 90,000.00 Goods- Post 2015/04/ 24126-GO- Request 21 RFB / for Bids Acquisition de matériels et équipements informatiques (serveurs, contrôleurs wifi, points d’accès, antenne BLR, VC) 23 MR-PEPHAN- 40,000.00 Goods- Post 2016/11/ 24035-GO- Request 01 RFB / for Bids Acquisition de matériels informatiques au profit du CRZF 24 MR-PEPHAN- 45,000.00 Goods- Post 2017/09/ 25681-GO- Request 12 RFB / for Bids Acquisition de materiel topographiqu e au profit de la Zone Franche de Nouadhibou III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans l'Annexe 1 des Directives Sélection et Emploi de consultants : Méthode de sélection Seuil choix de la Seuil de revue à méthode en US$ priori 1. SFCQ, SFQ, SMC et SCBD Tout montant Sup à 200,000 2. QC Inf ou égal à 200, 000 Sup à 100, 000 3. Entente directe (firmes, consultant sans montant Tous individuels) 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de $100,000 par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 2.7 des directives de sélection de consultants. 3. Services de Consultants 1 2 3 4 5 6 7 Réf. Description Coût Méthode Revue de Date Commentair /No. des missions estimatif de la Banque prévue de es sélection (à priori / soumissio à n des posteriori) propositio ns 1 MR-PEPHAN- 50,000.00 Consultant Post 2017/09/2 23991-CS- Services 4 INDV / Individual Recrutement d'un expert pour la rédaction du manuel des opérations (exécution et procédures) 2 MR-PEPHAN- 25,000.00 Consultant Post 2016/02/0 24028-CS- Services 1 INDV / Individual Recrutement d’un consultant pour le soutien a la conformité des PME et entreprises informelles 3 MR-PEPHAN- 60,000.00 Consultant Prior 2017/01/1 24210-CS- Services 3 INDV / Soutien Individual l'ANZF dans la mise en œuvre du projet : recrutement d'un expert Suivi&Evaluati on coordinateur adjoint 4 MR-PEPHAN- 50,000.00 Consultant Post 2015/07/2 24005-CS- Services 2 INDV / Soutien Individual à l’ANZF dans la mise en œuvre du Projet : Recrutement coach pour le pole halieutique 5 09-PAZF-SC- 20,000.00 Consultant Post 2016/12/0 2016 / Etude Services 1 régime foncier Individual du pole halieutique de la zone franche 6 14-1-PAZF-SC- 50,000.00 Consultant Post 2016/11/0 2016 / Services 1 SOUTIEN A Individual L’ÉTABLISSEM ENT GUICHET UNIQUE POUR LA FACILITATION DES EXPORTATION S-POISON FRAIS A NOUADHIBOU- 7 16-PAZF-SC- 60,000.00 Consultant Prior 2016/11/0 2016 / Soutien Services 1 à l'ANZF dans Individual la mise en œuvre du Projet : Recrutement d'un spécialiste en suivi- évaluation 8 MR-PEPHAN- 15,000.00 Consultant Post 2017/09/2 24503-CS- Services 1 INDV / Individual Recrutement d'un chargé de la communicatio n sur les avantages des réforme Doing Business 9 MR-PEPHAN- 60,000.00 Consultant Prior 2015/08/1 25676-CS- Services 7 INDV / Soutien Individual ANZF dans la mise en œuvre du projet: Spécialiste en gestion financiere 10 MR-PEPHAN- 15,000.00 Consultant Post 2015/03/0 24939-CS- Services 3 INDV / Individual Recrutement d’un expert chargé du système d’information 11 MR-PEPHAN- 60,000.00 Consultant Prior 2015/08/1 25675-CS- Services 3 INDV / Soutien Individual ANZF dans la mise en œuvre du projet: Specialiste en passation de marches 12 05-PAZF-SC- 10,000.00 Consultant Post 2016/08/1 2016 / Services 5 Recrutement Individual un consultant archiviste pour appuyer la CPMC 13 08-PAZF-SC- 10,000.00 Consultant Post 2016/10/0 2016 / Services 3 Elaboration Individual dun guide pratique du droit des affaires applicable dans la Zone Franche de Nouadhibou 14 MR-PEPHAN- 15,000.00 Consultant Post 2015/03/0 24943-CS- Services 3 INDV / Individual Recrutement d’un Consultant chargé du suivi de la mise en œuvre des actions de réformes Doing Businesss, 15 MR-PEPHAN- 60,000.00 Consultant Prior 2016/11/0 24945-CS- Services 1 INDV / Soutien Individual l'ANZF dans la mis en œuvre du projet : recrutement d'un expert environnemen tale 16 03-PAZF-SC- 20,000.00 Consultant Post 2016/07/0 2016 / Services 1 Formation sur Individual les techniques de médiation et de conciliation et redaction d’un guide pratique sur les procedures extra juridictionnelle s 17 06-PAZF-SC- 36,000.00 Consultant Post 2016/07/0 2016 / Services 1 Recrutement Individual d’un consultant national pour l’appui au comité technique en charge des PPP 18 MR-PEPHAN- 30,000.00 Consultant Post 2015/03/0 24209-CS- Services 3 INDV / Individual Recrutement d'un consultant international pour l'assistance technique à la DGPSP en matière de Doing Business 19 MR-PEPHAN- 30,000.00 Consultant Post 2015/12/0 24036-CS- Services 9 INDV / Etude Individual d’impact environnemen tal et social 20 MR-PEPHAN- 5,000.00 Consultant Post 2017/10/0 25565-CS- Services 2 INDV / Individual Recrutement dun consultant en communicatio n et infographie 21 04-1-PAZF-SC- 15,000.00 Consultant Post 2016/11/1 2016 / Services 5 Recrutement Individual dun expert pour rediger les TRS des activites de planification spatiale 22 MR-PEPHAN- 60,000.00 Consultant Post 2015/09/1 25621-CS- Services 5 INDV / Individual Assistance technique international pour le recrutement d' un consultant pour le DB 23 MR-PEPHAN- 30,000.00 Consultant Prior 2015/11/2 24064-CS-CDS Services- 6 / Assistance Direct technique pour l'elaboration d'un cadre juridique devant regir la delegation de gestion(conve ntion speciale)accor dée au Port Autonome de Nouadhibou dans le cadre de la Zonz Franche e Nouadhibou( expert en organisation de réforme) 24 MR-PEPHAN- 61,000.00 Consultant Prior 2017/03/1 24759-CS-CDS Services- 3 / Recrutement Direct d’un cabinet international pour la rédaction des décrets d’application de la loi relative aux PPP en Mauritanie. 25 MR-PEPHAN- 65,000.00 Consultant Post 2017/03/1 24755-CS-CDS Services- 3 / Recrutement Direct d’un cabinet international pour l’élaboration d’une étude financière complète pour le terminal pétrolier de Nouadhibou Nouakchott 26 MR-PEPHAN- 60,000.00 Consultant Prior 2015/05/0 24393-CS-CDS Services- 2 / Soutien à Direct l'ANZF dans la mise en œuvre du Projet : Sélection Coordinateur 27 MR-PEPHAN- 20,000.00 Consultant Prior 2015/11/2 24745-CS-CDS Services- 6 / Assistance Direct technique pour l'elaboration d'un cadre juridique devant regir la delegation de gestion(conve ntion speciale) accordée au PAN 28 MR-PEPHAN- 15,000.00 Consultant Prior 2015/03/1 24758-CS-CDS Services- 5 / Assistance Direct technique opérationnelle au suivi de la stratégie DPH 29 MR-PEPHAN- 25,000.00 Consultant Prior 2015/12/1 24008-CS-CDS Services- 1 / numerisation Direct des archives foncieres de l'ANZF 30 MR-PEPHAN- 50,000.00 Consultant Prior 2016/04/2 24070-CS-CDS Services- 3 / Recrutement Direct d'un Cabinet international pour la revision du cadre juridique et institutionnel des PPP 31 10-PAZF-SC- 320,000.0 Consultant Prior 2016/09/0 2016 / 0 Qualificati 1 Recrutement on d’une firme de communicatio n pour évènement 32 12-PAZF-SC- 60,000.00 Consultant Post 2016/09/0 2016 / Qualificati 1 Evaluation des on besoins d’assainissem ent du PAN 33 13-1-PAZF-SC- 70,000.00 Consultant Post 2016/12/2 2016 / Qualificati 6 Diagnostic des on besoins pour la facilitation des exports au poste frontiers douanes de Nouadhibou 34 02-PAZF-SC- 100,000.0 Consultant Prior 2016/09/0 2016 / 0 Qualificati 1 Recrutement on Societe et AT sur le foncier Mise en place dun outil de gestion fonciere du pole halieutique 35 11-1-PAZF-SC- 50,000.00 Consultant Post 2016/11/0 2016 / AT Qualificati 1 juridique on 36 MR-PEPHAN- 300,000.0 Consultant Prior 2015/01/0 24941-CS-CQS 0 Qualificati 7 / Recrutement on société pour Etude viabilité commerciale port en eau profonde 37 MR-PEPHAN- 50,000.00 Consultant Post 2015/08/1 24502-CS-CQS Qualificati 7 / Promotion et on marketing : Développeme nt d’un logiciel de suivi des investisseurs 38 MR-PEPHAN- 150,000.0 Consultant Prior 2017/11/1 24762-CS-CQS 0 Qualificati 3 / Etude sur la on valorisation des exportations de poissons par le corridor routier Nord(Sud 39 MR-PEPHAN- 300,000.0 Consultant Prior 2014/12/1 24500-CS-CQS 0 Qualificati 7 / Recrutement on société pour Etude viabilité commerciale aéroport 40 MR-PEPHAN- 50,000.00 Consultant Prior 2017/12/1 24766-CS-CQS Qualificati 5 / Assistance SI on pour le compte de l'ANZF 41 MR-PEPHAN- 60,000.00 Consultant Post 2017/12/2 24066-CS-CQS Qualificati 5 / Recrutement on d’une firme pour l’évaluation de la viabilité commerciale et étude de préfaisabilité d’une unité de dessalement d’eau de mer à Nouadhibou 42 MR-PEPHAN- 1,000,000. Quality Prior 2015/02/1 24940-CS-QBS 00 Based 2 / Recrutement Selection Societé pour (QBS) Etude pole halieutique 43 MR-PEPHAN- 20,000.00 Consultant Prior 2016/03/1 24751-CS-LCS Services- 5 / Recrutement Least Cost d'un bureau Based pour l'audit du Selection projet pour les (LCBS) exercices 2015- 2016,2016- 2017,2017- 2018 44 MR-PEPHAN- 900,000.0 Consultant Prior 2017/07/1 24761-CS- 0 Services- 8 QCBS / Quality Recrutement and Cost consultant Based pour l'AT Selection aupres des (QCBS) FNP de Mauritanie et ainsi que des formations ciblées pour les acteurs locaux du pole halieutique de nouadhibou 45 01-PAZF-SC- 150,000.0 Consultant Prior 2016/09/0 2016 / Etude 0 Services- 1 de l Quality ameneageme and Cost nt et systeme Based information Selection Geographique (QCBS) du pole halietique 46 MR-PEPHAN- 35,000.00 Consultant Post 2016/05/2 24747-CS- Services- 4 QCBS / Quality Recrutement and Cost d’un bureau Based d’études et Selection suivi des (QCBS) travaux de construction d’un terminal frigorifique à l’aéroport international de Nouadhibou PROCUREMENT Mauritania : Nouadhibou Eco-Seafood Cluster Project PLAN General Information Country: Mauritania Bank’s Approval Date of the Original Procurement Plan: 2016-09-06 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151058 GPN Date: 2019-11-27 Project Name: Nouadhibou Eco-Seafood Cluster Project Loan / Credit No: IDA / D1040, IDA / D4660 N Executing Agency(ies): ouadhibou Eco-Seafood Cluster Project WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 01-PAZF-AON-T-2016 / Increasing the value of Travaux de construction et seafood products produced equipment terminale Single Stage - One 1,026,929.9 2017-08- IDA / D1040 and marketed in the seafood Prior Request for Bids Open - National 700,000.00 Signed 2016-11-01 2019-05-15 2016-11-06 2019-05-16 2016-12-18 2019-07-04 2017-01-17 2019-11-07 2017-02-21 2020-01-17 frigorifique pour entreposage Envelope 8 20 cluster with the participation du fret a l aroport of local acto rs international de Nouadhibou MR-PEPHAN-25577-CW-RFQ Developing a sustainable Request for Single Stage - One 2017-09- / Aménagement des bureaux IDA / D1040 seafood cluster in Post Limited 1,800.00 0.00 Canceled 2017-01-22 2017-03-19 Quotations Envelope 15 (Envi et Assi-compt) Nouadhibou Increasing the value of MR-PEPHAN-145332-CW- seafood products produced RFB / Construction d’une halle Single Stage - One 2020-12- IDA / D4660 and marketed in the seafood Post Request for Bids Open - National 1,265,000.00 0.00 Canceled 2020-03-11 2020-03-16 2020-04-27 2020-05-27 2020-07-01 à marée pour les Envelope 28 cluster with the participation céphalopodes à l’EPBR of local acto rs MR-PEPHAN-145336-CW- Developing a sustainable RFB / Construction d’un Single Stage - One 2020-12- IDA / D4660 seafood cluster in Post Request for Bids Open - National 370,000.00 0.00 Canceled 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 bâtiment pour la gouvernance Envelope 19 Nouadhibou du PCH MR-PEPHAN-145338-CW- Strengthening the enabling RFB / Réhabilitation du Single Stage - One 2021-04- IDA / D4660 environment for private Post Request for Bids Open - National 770,000.00 0.00 Canceled 2020-06-19 2020-06-24 2020-08-05 2020-09-04 2020-10-09 bâtiment de la justice Envelope 07 sector development commerciale GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02-PZF-F-2016 / Developing a sustainable Request for Single Stage - One Equipement et refection de IDA / D1040 seafood cluster in Post Limited 22,000.00 7,249.33 Completed 2016-07-20 2016-07-15 2016-09-14 2016-07-27 2017-03-13 2016-10-17 Quotations Envelope salle archive Nouadhibou MR-PEPHAN-24126-GO-RFB / Acquisition de matériels et Developing a sustainable équipements informatiques Single Stage - Two IDA / D1040 seafood cluster in Post Request for Bids Open - National 90,000.00 74,880.17 Completed 2015-04-21 2015-04-22 2015-04-26 2015-06-07 2015-08-20 2015-05-26 2015-09-24 2015-09-16 2016-03-22 2017-02-28 (serveurs, contrôleurs wifi, Envelope Nouadhibou points d’accès, antenne BLR, VC) MR-PEPHAN-24231-GO-RFQ Developing a sustainable / Acquisition d’équipements Request for Single Stage - One IDA / D1040 seafood cluster in Post Limited 24,000.00 18,575.37 Completed 2015-10-11 2015-10-06 2015-12-06 2015-10-28 2016-06-03 2016-03-14 de vidéoconférence pour Quotations Envelope Nouadhibou l’UCP et l’ANZF MR-PEPHAN-24059-GO-RFQ Developing a sustainable Request for Single Stage - One / Acquisition de matériels IDA / D1040 seafood cluster in Post Limited 8,000.00 17,484.13 Completed 2015-05-10 2015-05-05 2015-07-05 2015-05-13 2016-01-01 2015-05-18 Quotations Envelope informatiques pour la DGPSP Nouadhibou MR-PEPHAN-24035-GO-RFB Developing a sustainable / Acquisition de matériels Single Stage - Two IDA / D1040 seafood cluster in Post Request for Bids Open - National 40,000.00 34,059.83 Completed 2016-11-01 2016-11-04 2016-11-06 2016-12-18 2016-12-08 2017-03-02 2017-03-01 2017-04-06 2017-04-06 2017-10-03 2017-06-08 informatiques au profit du Envelope Nouadhibou CRZF MR-PEPHAN-24057-GO-RFQ Developing a sustainable Request for Single Stage - One / Elaborer d’ un IDA / D1040 seafood cluster in Post Limited 3,000.00 2,673.79 Completed 2016-11-26 2016-11-22 2017-01-21 2016-12-01 2017-07-20 2016-12-06 Quotations Envelope dépliant/livret de présentation Nouadhibou du projet MR-PEPHAN-24038-GO-RFB / Production ,conception et impression de support de Developing a sustainable communication et de Single Stage - Two IDA / D1040 seafood cluster in Post Request for Bids Open - National 90,000.00 67,381.57 Completed 2017-11-22 2017-10-06 2017-11-27 2017-10-26 2018-01-08 2017-12-07 2018-03-23 2018-01-11 2018-04-27 2018-09-04 2018-10-24 2019-09-11 promition pour la Envelope Nouadhibou Vulgarisation des textes d'application de la stratégie du secteur des pêches 01-PAZF-F-AON-2016 / Recrutement Agence de Developing a sustainable communication charge de la Single Stage - One IDA / D1040 seafood cluster in Post Request for Bids Open - National 40,000.00 0.00 Canceled 2016-07-15 2016-07-20 2016-08-31 2016-09-30 2016-11-04 2017-05-03 conception et edition Envelope Nouadhibou brochure portant sur les reformes Doing busness 2015 MR-PEPHAN-25681-GO-RFB Developing a sustainable / Acquisition de materiel Single Stage - One IDA / D1040 seafood cluster in Post Request for Bids Open - National 45,000.00 0.00 Canceled 2017-09-12 2017-08-28 2017-09-14 2017-09-27 2017-10-14 2017-10-19 2017-10-19 2017-12-21 2017-11-05 2017-11-25 topographique au profit de la Envelope Nouadhibou Zone Franche de Nouadhibou MR-PEPHAN-25691-GO-RFB Developing a sustainable / Acquisition de deux Single Stage - One IDA / D1040 seafood cluster in Post Request for Bids Open - National 57,000.00 54,601.69 Completed 2017-09-21 2017-08-29 2017-09-26 2017-09-27 2017-10-26 2017-10-19 2017-11-25 2017-12-07 2017-12-19 2018-01-25 2018-01-18 2018-08-08 vehicules leger au profit de Envelope Nouadhibou l'UCP Page 1 MR-PEPHAN-49501-GO-DIR / Recrutement d'une Agence de Communication pour la Developing a sustainable préparation et l'organisation IDA / D1040 seafood cluster in Prior Direct Selection Direct 100,000.00 99,982.00 Completed 2018-02-27 2018-03-02 2018-02-28 2018-03-05 2018-03-05 2018-03-22 2018-04-05 2018-03-29 de la 2ème édition du Forum Nouadhibou Invest'in Nouadhibou Free Zone. MR-PEPHAN-51580-GO-RFQ / Acquisition de quatre Developing a sustainable ordinateurs portables au Request for Single Stage - One IDA / D1040 seafood cluster in Post Open - National 4,000.00 439.07 Completed 2018-03-20 2018-05-15 2018-05-21 2018-11-11 2018-06-12 profit de l'Unité de Quotations Envelope Nouadhibou Coordination du Projet Eco- Pole Hlieutique de Nouadhibou MR-PEPHAN-67666-GO-RFQ Developing a sustainable / Acquisition du Matériel Request for Single Stage - One IDA / D1040 seafood cluster in Post Limited 29,000.00 23,923.42 Completed 2018-07-07 2018-10-05 2018-09-01 2018-12-21 2019-02-28 2018-12-24 Topographique au profit de Quotations Envelope Nouadhibou l'ANZF MR-PEPHAN-93128-GO-RFQ / Acquisition d'un groupe Developing a sustainable Request for Single Stage - One électrogène 22 kVa au profit IDA / D1040 seafood cluster in Post Limited 11,000.00 10,027.40 Completed 2019-01-08 2019-03-18 2019-02-01 2019-04-22 2019-02-11 2019-04-23 Quotations Envelope de l'Unité de Coordination du Nouadhibou PEPHN MR-PEPHAN-93130-GO-RFQ Developing a sustainable Request for Single Stage - One / Fourniture de bureau pour le IDA / D1040 seafood cluster in Post Limited 5,500.00 5,709.86 Completed 2019-01-08 2019-03-27 2019-01-29 2019-04-30 2019-11-25 2019-05-03 Quotations Envelope fonctionnement de l'UCP Nouadhibou MR-PEPHAN-24234-GO-RFQ / Souscription d’une police Developing a sustainable d’assurance maladie et risque Request for Single Stage - One IDA / D1040 seafood cluster in Post Limited 20,000.00 12,388.49 Completed 2018-09-29 2018-03-07 2018-11-24 2018-11-14 2019-05-23 2019-11-15 accident pour le personnel Quotations Envelope Nouadhibou cadre du projet et leurs familles 01-PAZF-F-2016 / Pomotion Developing a sustainable emarketing recutement Request for Single Stage - One IDA / D1040 seafood cluster in Post Limited 30,000.00 0.00 Canceled 2016-07-20 2016-09-14 2017-03-13 agence pour la realisation Quotations Envelope Nouadhibou video promotionnelle MR-PEPHAN-25692-GO-RFQ Developing a sustainable Request for Single Stage - One / Acquisition d'un vehicule IDA / D1040 seafood cluster in Post Limited 20,000.00 0.00 Canceled 2017-09-26 2017-11-21 2018-05-20 Quotations Envelope forganette au profit de l'UCP Nouadhibou 03-PAZF-F-2016 / Developing a sustainable Realisation Site Internet dedie Request for Single Stage - One IDA / D1040 seafood cluster in Post Limited 30,000.00 0.00 Canceled 2016-07-20 2016-09-14 2017-03-13 au Pole halieutique de Quotations Envelope Nouadhibou nouadhibou MR-PEPHAN-24481-GO-DIR / Réalisation de documents de Developing a sustainable communication de l'étude de IDA / D1040 seafood cluster in Prior Direct Selection Direct 30,000.00 0.00 Canceled 2016-10-17 2016-10-22 2016-11-26 2017-05-25 préfaisabilité du port en eaux Nouadhibou profondes de Nouadhibou MR-PEPHAN-24069-GO-RFQ Developing a sustainable Request for Single Stage - One / Acquisition d’une solution IDA / D1040 seafood cluster in Prior Limited 45,000.00 0.00 Canceled 2015-05-03 2015-06-28 2015-12-25 Quotations Envelope GED Nouadhibou MR-PEPHAN-25677-GO-DIR Developing a sustainable / Acquisition d’un logiciel IDA / D1040 seafood cluster in Prior Direct Selection Direct 12,000.00 0.00 Canceled 2015-09-17 2015-09-22 2015-10-27 2016-04-24 TOMPRO pour l’UCP Nouadhibou MR-PEPHAN-25678-GO-DIR Developing a sustainable / Acquisition dun systeme de IDA / D1040 seafood cluster in Prior Direct Selection Direct 2,500.00 0.00 Canceled 2016-11-24 2016-11-29 2017-01-03 2017-07-02 messagerie pour le compte du Nouadhibou PEPHN MR-PEPHAN-24042-GO-RFQ Developing a sustainable / Acquisition de matériels et Request for Single Stage - One IDA / D1040 seafood cluster in Post Limited 15,000.00 0.00 Canceled 2015-08-23 2015-10-18 2016-04-15 équipements informatiques Quotations Envelope Nouadhibou pour les besoins de l'UCP lot 1 MR-PEPHAN-24040-GO-RFQ / Mobilier de bureau et Developing a sustainable Request for Single Stage - One materiel informatique pour le IDA / D1040 seafood cluster in Post Limited 4,200.00 0.00 Canceled 2017-02-14 2017-04-11 2017-10-08 Quotations Envelope bureau de Coordinateur Nouadhibou Adjoint MR-PEPHAN-24006-GO-RFQ / Aménagement Chapiteaux, Developing a sustainable Request for Single Stage - One plancher professionnel, IDA / D1040 seafood cluster in Post Limited 21,000.00 0.00 Canceled 2017-04-15 2017-06-10 2017-12-07 Quotations Envelope équipements de son et Nouadhibou éclairage MR-PEPHAN-25700-GO-RFQ Developing a sustainable / Acquisition du materiel Request for Single Stage - One IDA / D1040 seafood cluster in Post Limited 5,000.00 0.00 Canceled 2016-07-20 2016-09-14 2017-03-13 informatique pour la salle Quotations Envelope Nouadhibou d'archive de la CPMC lot 1 MR-PEPHAN-25697-GO-RFQ Developing a sustainable Request for Single Stage - One / Acquisition de mobilier de IDA / D1040 seafood cluster in Post Limited 12,000.00 0.00 Canceled 2015-08-23 2015-10-18 2016-04-15 Quotations Envelope burau au profit de l'UCP lot 2 Nouadhibou MR-PEPHAN-104325-GO- Developing a sustainable RFQ / Acquisition des Request for Single Stage - One IDA / D1040 seafood cluster in Post Limited 30,000.00 48,536.98 Completed 2019-02-20 2019-02-15 2019-04-17 2019-02-18 2019-10-14 2019-02-25 équipements et fourniture au Quotations Envelope Nouadhibou profit de la celille PPP MR-PEPHAN-145303-GO- RFQ / Acquisition de Strengthening the enabling Pending mobiliers de bureau au profit Request for Single Stage - One IDA / D4660 environment for private Post Open - National 40,000.00 0.00 Implementati 2020-08-28 2020-10-23 2021-04-21 des registres commerciaux Quotations Envelope sector development on (registre central, Nouakchott et Nouadhibou) MR-PEPHAN-145316-GO- Request for Single Stage - One RFQ / Acquisition de matériel IDA / D4660 Project management Post Limited 2,635.00 2,717.04 Completed 2020-04-09 2020-01-28 2020-06-04 2020-03-10 2020-12-01 2020-03-16 Quotations Envelope bureautique Page 2 MR-PEPHAN-145331-GO- Request for Single Stage - One RFQ / Fourniture de bureau au IDA / D4660 Project management Post Limited 2,700.00 1,720.33 Completed 2020-02-10 2020-01-28 2020-04-06 2020-05-10 2020-10-03 2020-05-11 Quotations Envelope profit de l'UCP MR-PEPHAN-145273-GO- RFB / Acquisition des Strengthening the enabling Pending équipements informatiques au Single Stage - One IDA / D4660 environment for private Post Request for Bids Open - National 100,000.00 0.00 Implementati 2020-08-24 2020-08-29 2020-10-10 2020-11-09 2020-12-14 2021-06-12 profit des registres Envelope sector development on commerciaux (registre central, Nouakchott et Nouadhibou) MR-PEPHAN-233102-GO- Increasing the value of RFB / Fournitures, installation seafood products produced Under Single Stage - One et mise en service de deux IDA / D4660 and marketed in the seafood Post Request for Bids Open - National 850,000.00 0.00 Implementati 2021-05-11 2021-06-03 2021-05-14 2021-06-03 2021-06-13 2021-06-28 2021-07-15 2021-10-13 Envelope stations de pompage de cluster with the participation on poisson au PAN et á l’EPBR of local acto rs MR-PEPHAN-233105-GO- RFQ / Acquisition de Strengthening the enabling Pending Request for Single Stage - One mobiliers de bureau au profit IDA / D4660 environment for private Post Limited 40,000.00 0.00 Implementati 2021-05-11 2021-06-09 2021-06-24 Quotations Envelope de la chaîne de la justice sector development on commerciale MR-PEPHAN-233106-GO- RFQ / Acquisition des Strengthening the enabling Under équipements informatiques au Request for Single Stage - One IDA / D4660 environment for private Post Limited 160,000.00 0.00 Implementati 2021-05-18 2021-06-11 2021-07-11 profit de la chaîne de la Quotations Envelope sector development on justice commerciale (Nouakchott et Nouadhibou) MR-PEPHAN-233229-GO- Pending RFQ / Acquisition des biens et Request for Single Stage - One IDA / D4660 Project management Post Limited 25,000.00 0.00 Implementati 2021-05-20 2021-06-11 2021-06-21 services consommables au Quotations Envelope on profit de l'UCP Increasing the value of MR-PEPHAN-145484-GO- seafood products produced RFB / Fournitures, installation Single Stage - One IDA / D4660 and marketed in the seafood Post Request for Bids Open - International 400,000.00 0.00 Canceled 2020-09-15 2020-09-20 2020-11-01 2020-12-01 2021-01-05 2021-07-04 et mise en service d'une Envelope cluster with the participation station de pompage au PAN of local acto rs MR-PEPHAN-236055-GO- RFQ / Recrutement d’un consultant pour l’élaboration Strengthening the enabling Pending Request for Single Stage - One de supports de IDA / D4660 environment for private Post Limited 30,000.00 0.00 Implementati 2021-05-28 2021-06-19 2021-08-18 Quotations Envelope communication physiques et sector development on audiovisuels pour la participation de l’APIM NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-PEPHAN-51588-NC-RFQ / Souscription police Developing a sustainable Request for Single Stage - One assurance santé du personnel IDA / D1040 seafood cluster in Post Limited 20,000.00 8,126.93 Completed 2018-03-17 2015-09-22 2018-05-12 2016-03-25 2018-11-08 2018-03-24 Quotations Envelope du Projet d'Eco-Pole Nouadhibou Halieutique de Nouadhibou MR-PEPHAN-120229-NC-DIR Increasing the value of / Mise en place d’un pilot de seafood products produced radio à destination des IDA / D1040 and marketed in the seafood Post Direct Selection Direct 71,000.00 67,444.53 Terminated 2019-07-15 2019-08-20 2019-07-20 2019-07-10 2019-08-24 2019-10-22 2020-02-20 acteurs de la pêche en cluster with the participation Mauritanie, of local acto rs MR-PEPHAN-120305-NC-DIR Developing a sustainable / Numérisation des archives IDA / D1040 seafood cluster in Post Direct Selection Direct 10,000.00 9,748.87 Completed 2019-07-22 2019-08-19 2019-07-27 2019-08-20 2019-08-31 2019-09-17 2019-10-30 2019-09-25 du foncier de la Zone Franche Nouadhibou de Nouadhibou MR-PEPHAN-145270-NC- RFB / Recrutement d'une Strengthening the enabling firme pour la mise en place du Single Stage - One IDA / D4660 environment for private Post Request for Bids Open - International 250,000.00 0.00 Canceled 2020-01-20 2020-01-14 2020-01-25 2020-01-14 2020-03-07 2020-03-05 2020-04-06 2020-05-11 2020-11-07 système d'information du Envelope sector development registre de commerce de la Mauritanie MR-PEPHAN-145271-NC- RFB / Recrutement d'un prestateur de service pour le Strengthening the enabling developpement , la mise en Single Stage - One IDA / D4660 environment for private Post Request for Bids Open - International 250,000.00 309,400.00 Signed 2020-01-20 2020-01-14 2020-01-25 2020-01-14 2020-03-07 2020-03-05 2020-04-06 2020-06-11 2020-05-11 2021-02-10 2020-11-07 exploitation d'une solution Envelope sector development logiciel integré de la gestion de la chaine de la justice commerciale MR-PEPHAN-183068-NC- RFB / Recrutement d'une Strengthening the enabling Under firme pour la mise en place du Single Stage - One IDA / D4660 environment for private Post Request for Bids Open - International 250,000.00 0.00 Implementati 2020-07-08 2020-07-08 2020-07-08 2020-07-13 2020-08-07 2020-08-27 2020-08-14 2020-06-11 2020-09-01 2021-10-31 système d'information du Envelope sector development on registre de commerce de la Mauritanie MR-PEPHAN-145293-NC-DIR Developing a sustainable / Organisation du Forum IDA / D4660 seafood cluster in Post Direct Selection Direct 100,000.00 0.00 Canceled 2020-01-22 2020-01-27 2020-03-02 2020-08-29 Invest'In Nouadhibou 2020 Nouadhibou CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Developing a sustainable Consultant 11-PAZF-SC-2016 / AT IDA / D1040 seafood cluster in Prior Qualification Open - National 50,000.00 0.00 Canceled 2016-07-15 2016-08-05 2016-09-18 2016-10-18 2016-11-22 2017-05-21 juridique Nouadhibou Selection Page 3 13-PAZF-SC-2016 / Increasing the value of Diagnostic des besoins pour seafood products produced Consultant la facilitation des exports au IDA / D1040 and marketed in the seafood Prior Qualification Open - International 70,000.00 0.00 Canceled 2016-10-03 2016-10-24 2016-12-07 2017-01-06 2017-02-10 2017-08-09 poste frontiers douanes de cluster with the participation Selection Nouadhibou of local acto rs MR-PEPHAN-24940-CS-QBS Developing a sustainable Quality Based / Recrutement Societé pour IDA / D1040 seafood cluster in Prior Open - International 1,000,000.00 1,298,000.00 Completed 2015-02-12 2017-08-24 2015-03-05 2015-04-18 2015-05-16 2015-09-02 2015-06-15 2017-08-24 2015-07-15 2017-11-10 2015-08-19 2016-03-24 2016-08-18 2017-05-17 Selection Etude pole halieutique Nouadhibou MR-PEPHAN-24761-CS- QCBS / Recrutement Increasing the value of consultant pour l'AT aupres seafood products produced des FNP de Mauritanie et ainsi Quality And Cost- IDA / D1040 and marketed in the seafood Prior Open - International 900,000.00 1,000,746.00 Signed 2017-07-18 2017-09-20 2017-08-08 2017-09-27 2017-09-21 2017-11-17 2017-10-19 2018-01-18 2017-11-18 2019-08-22 2017-12-23 2019-11-29 2018-01-27 2020-02-20 2019-01-27 que des formations ciblées Based Selection cluster with the participation pour les acteurs locaux du of local acto rs pole halieutique de nouadhibou MR-PEPHAN-24747-CS- QCBS / Recrutement d’un Increasing the value of bureau d’études et suivi des seafood products produced Quality And Cost- travaux de construction d’un IDA / D1040 and marketed in the seafood Post Open - National 35,000.00 34,598.89 Completed 2016-05-24 2017-12-15 2016-06-14 2017-12-22 2016-07-28 2018-04-12 2016-08-25 2018-05-24 2016-09-24 2018-06-29 2016-10-29 2018-07-19 2016-12-03 2018-09-04 2017-12-03 2019-03-01 Based Selection terminal frigorifique à cluster with the participation l’aéroport international de of local acto rs Nouadhibou 07-PAZF-SC-2016 / Redaction et publication une vision comprehensive Developing a sustainable Quality And Cost- integrant le nouveau mode de IDA / D1040 seafood cluster in Post Open - International 150,000.00 0.00 Canceled 2016-09-01 2016-09-22 2016-11-05 2016-12-03 2017-01-02 2017-02-06 2017-03-13 2018-03-13 Based Selection gestion des peches au sien du Nouadhibou pole de competitivite halieutique de Nouadhibou MR-PEPHAN-93132-CS-LCS / Recrutement d'un Consultant pour l'Audit Developing a sustainable Least Cost externe du Projet Eco-Pole IDA / D1040 seafood cluster in Post Open - National 20,000.00 11,018.54 Signed 2019-03-14 2019-04-29 2019-04-04 2019-05-09 2019-05-18 2019-08-15 2019-06-15 2019-10-21 2019-07-15 2019-12-06 2019-08-19 2019-12-17 2019-09-23 2020-01-02 2021-09-22 Selection Halieutique de Nouadhibou Nouadhibou pour les exercices 2019 ,2020 et 2021. 02-PAZF-SC-2016 / Recrutement Societe et AT sur Developing a sustainable Consultant le foncier Mise en place dun IDA / D1040 seafood cluster in Prior Qualification Open - National 100,000.00 0.00 Canceled 2016-09-01 2016-09-22 2016-11-05 2016-12-05 2017-01-09 2017-07-08 outil de gestion fonciere du Nouadhibou Selection pole halieutique Increasing the value of 12-PAZF-SC-2016 / seafood products produced Consultant Evaluation des besoins d IDA / D1040 and marketed in the seafood Post Qualification Open - National 60,000.00 0.00 Canceled 2016-09-01 2016-09-22 2016-11-05 2016-12-05 2017-01-09 2017-07-08 assainissement du PAN cluster with the participation Selection of local acto rs 01-PAZF-SC-2016 / Etude de Developing a sustainable l ameneagement et systeme Quality And Cost- IDA / D1040 seafood cluster in Prior Open - International 150,000.00 0.00 Canceled 2016-09-01 2016-09-22 2016-11-05 2016-12-03 2017-01-02 2017-02-06 2017-03-13 2018-03-13 information Geographique du Based Selection Nouadhibou pole halietique 10-PAZF-SC-2016 / Developing a sustainable Consultant Recrutement d une firme de IDA / D1040 seafood cluster in Prior Qualification Open - International 320,000.00 0.00 Canceled 2016-09-01 2017-12-05 2016-09-22 2017-12-07 2016-11-05 2018-08-13 2016-12-05 2017-01-09 2017-07-08 communication pour Nouadhibou Selection evenement MR-PEPHAN-24941-CS-CQS Developing a sustainable Consultant / Recrutement société pour IDA / D1040 seafood cluster in Prior Qualification Open - International 300,000.00 0.00 Canceled 2015-01-07 2017-08-24 2015-01-28 2015-03-13 2017-11-10 2015-04-12 2015-05-17 2015-11-13 Etude viabilité commerciale Nouadhibou Selection port en eau profonde MR-PEPHAN-24500-CS-CQS Developing a sustainable Consultant / Recrutement société pour IDA / D1040 seafood cluster in Prior Qualification Open - International 300,000.00 0.00 Canceled 2014-12-17 2017-08-24 2015-01-07 2015-02-20 2017-08-24 2015-03-22 2015-04-26 2015-10-23 Etude viabilité commerciale Nouadhibou Selection aéroport MR-PEPHAN-24751-CS-LCS / Recrutement d'un bureau Developing a sustainable Least Cost pour l'audit du projet pour les IDA / D1040 seafood cluster in Prior Open - National 20,000.00 0.00 Canceled 2016-03-15 2016-04-05 2016-05-19 2016-06-16 2016-07-16 2016-08-20 2016-09-24 2017-03-23 Selection exercices 2015-2016,2016- Nouadhibou 2017,2017-2018 MR-PEPHAN-24766-CS-CQS Developing a sustainable Consultant / Assistance SI pour le compte IDA / D1040 seafood cluster in Prior Qualification Open - National 50,000.00 0.00 Canceled 2017-12-15 2018-01-05 2018-02-18 2018-03-20 2018-04-24 2018-10-21 de l'ANZF Nouadhibou Selection Increasing the value of MR-PEPHAN-24762-CS-CQS seafood products produced Consultant / Etude sur la valorisation des IDA / D1040 and marketed in the seafood Prior Qualification Open - National 150,000.00 0.00 Canceled 2017-11-13 2017-12-04 2018-01-17 2018-02-16 2018-03-23 2018-09-19 exportations de poissons par cluster with the participation Selection le corridor routier Nord(Sud of local acto rs Developing a sustainable Consultant 11-1-PAZF-SC-2016 / AT IDA / D1040 seafood cluster in Post Qualification Open - National 50,000.00 0.00 Canceled 2016-11-01 2016-11-22 2017-01-05 2017-02-04 2017-03-11 2017-09-07 juridique Nouadhibou Selection 13-1-PAZF-SC-2016 / Diagnostic des besoins pour Developing a sustainable Consultant la facilitation des exports au IDA / D1040 seafood cluster in Post Qualification Open - National 70,000.00 0.00 Canceled 2016-12-26 2018-07-31 2017-01-16 2018-10-12 2017-03-01 2017-03-31 2017-05-05 2017-11-01 poste frontiers douanes de Nouadhibou Selection Nouadhibou MR-PEPHAN-24502-CS-CQS Developing a sustainable Consultant / Promotion et marketing : IDA / D1040 seafood cluster in Post Qualification Open - National 50,000.00 0.00 Canceled 2015-08-17 2015-04-29 2015-09-07 2015-10-21 2015-08-17 2015-11-20 2015-11-30 2015-12-25 2016-06-22 Développement d’un logiciel Nouadhibou Selection de suivi des investisseurs MR-PEPHAN-24066-CS-CQS / Recrutement d’une firme pour  l’évaluation de la Developing a sustainable Consultant viabilité commerciale et étude IDA / D1040 seafood cluster in Post Qualification Open - National 60,000.00 0.00 Canceled 2017-12-25 2018-04-27 2018-01-15 2018-06-07 2018-02-28 2018-11-15 2018-03-30 2019-04-18 2018-05-04 2018-10-31 de préfaisabilité d’une unité Nouadhibou Selection de dessalement d’eau de mer à Nouadhibou Page 4 MR-PEPHAN-104331-CS- Developing a sustainable Consultant CQS / Recrutement d’une IDA / D1040 seafood cluster in Post Qualification Open - National 320,000.00 320,000.00 Signed 2017-12-25 2017-11-13 2018-01-15 2018-02-28 2019-09-11 2018-03-30 2019-09-23 2018-05-04 2019-10-22 2018-10-31 firme de communication pour Nouadhibou Selection évènements MR-PEPHAN-104358-CS- CQS / Diagnostic des besoins Developing a sustainable Consultant pour la facilitation des IDA / D1040 seafood cluster in Post Qualification Open - National 70,000.00 54,459.85 Completed 2018-07-31 2018-10-09 2018-08-21 2018-10-04 2019-03-25 2018-11-03 2019-08-21 2018-12-08 2019-09-04 2019-06-06 2019-10-31 exports au poste frontiers Nouadhibou Selection douanes de Nouadhibou MR-PEPHAN-93140-CS-CQS / Recrutement d’une firme Increasing the value of pour l’évaluation de la seafood products produced Consultant viabilité commerciale et étude IDA / D1040 and marketed in the seafood Post Qualification Open - National 60,000.00 59,344.00 Signed 2018-04-27 2018-04-26 2018-05-18 2018-07-01 2018-11-15 2018-07-31 2019-04-18 2018-09-04 2019-05-06 2019-03-03 de préfaisabilité d’une unité cluster with the participation Selection de dessalement d’eau de mer of local acto rs à Nouadhibou MR-PEPHAN-145309-CS- QCBS / Recrutement d'un bureau d'étude pour l'élaboration des études Developing a sustainable techniques (APS), du Dossier Quality And Cost- IDA / D4660 seafood cluster in Post Open - National 30,000.00 39,259.22 Completed 2020-01-03 2020-01-15 2020-01-24 2020-01-16 2020-03-08 2020-02-20 2020-04-05 2020-03-24 2020-05-05 2020-04-09 2020-06-09 2020-04-14 2020-07-14 2020-05-06 2021-07-14 2020-10-26 d’exécution, du dossier Based Selection Nouadhibou d'appel d'offres (DAO) et le suivi de travaux de construction d’un bâtiment pour la gouvernance du PCH MR-PEPHAN-145280-CS- QCBS / Recrutement d'un Increasing the value of bureau d'étude pour seafood products produced l'élaboration des specification Quality And Cost- Pending IDA / D4660 and marketed in the seafood Post Open - National 30,000.00 0.00 2020-01-03 2020-01-24 2020-03-08 2020-04-05 2020-05-05 2020-06-09 2020-07-14 2021-07-14 techniques , (DAO) et le suivi Based Selection Implementation cluster with the participation d'installation et de mise en of local acto rs service de deux stations de pompages (PAN et EPBR) MR-PEPHAN-145330-CS- QCBS / Recrutement d'un Increasing the value of bureau d'étude pour seafood products produced l'élaboration des études Quality And Cost- IDA / D4660 and marketed in the seafood Post Open - National 30,000.00 27,578.52 Terminated 2020-01-03 2019-12-18 2020-01-24 2019-12-31 2020-03-08 2020-01-24 2020-04-05 2020-03-05 2020-05-05 2020-03-24 2020-06-09 2020-04-06 2020-07-14 2020-04-21 2021-07-14 techniques (APS), (DE), (DAO) Based Selection cluster with the participation et le suivi de travaux de of local acto rs construction d’une halle à marée pour les céphalopodes MR-PEPHAN-145318-CS- QCBS / Recrutement d'une Strengthening the enabling agence de communication Quality And Cost- Under IDA / D4660 environment for private Post Open - International 250,000.00 0.00 2020-01-25 2019-12-31 2020-02-15 2019-12-31 2020-03-30 2020-08-14 2020-04-27 2020-05-27 2020-07-01 2020-08-05 2021-08-05 pour appuyer dans Based Selection Implementation sector development l'amelioration du climat des affaires en Mauritanie MR-PEPHAN-145216-CS- CQS / Recrutement d'un Strengthening the enabling Consultant consultant pour la réalisation Under IDA / D4660 environment for private Post Qualification Open - National 50,000.00 0.00 2020-01-15 2019-12-18 2020-02-05 2019-12-31 2020-03-20 2020-04-19 2020-05-24 2020-11-20 du SI intégré du GU en vue Implementation sector development Selection d'une dématérialisation des procédures MR-PEPHAN-104370-CS- Developing a sustainable Consultant CQS / Assistance SI pour le IDA / D1040 seafood cluster in Post Qualification Open - National 50,000.00 0.00 Canceled 2019-09-23 2019-10-14 2019-11-27 2019-12-27 2020-01-31 2020-07-29 compte de l'ANZF Nouadhibou Selection MR-PEPHAN-104353-CS- Increasing the value of CQS / Etude sur la valorisation seafood products produced Consultant des exportations de poissons IDA / D1040 and marketed in the seafood Post Qualification Open - National 150,000.00 0.00 Canceled 2019-07-15 2019-08-05 2019-09-18 2019-10-18 2019-11-22 2020-05-20 par le corridor routier cluster with the participation Selection Nord(Sud) of local acto rs Developing a sustainable Consultant MR-PEPHAN-104349-CS- Pending IDA / D4660 seafood cluster in Post Qualification Open - National 30,000.00 0.00 2019-05-20 2019-06-10 2019-07-24 2019-08-23 2019-09-27 2020-03-25 CQS / AT juridique Implementation Nouadhibou Selection MR-PEPHAN-152363-CS- QCBS / Recrutement d’un consultant pour l’étude de Strengthening the enabling Quality And Cost- Under faisabilité du projet PPP de IDA / D4660 environment for private Post Open - National 200,000.00 0.00 2020-01-30 2020-01-22 2020-02-20 2020-01-30 2020-04-04 2020-05-02 2020-06-01 2020-07-06 2020-08-10 2021-02-06 Based Selection Implementation construction de 10.000 sector development logements économiques et sociaux en Mauritanie MR-PEPHAN-154850-CS- QCBS / Recrutement d'un bureau d'étude pour l'élaboration des études Strengthening the enabling techniques (APS), du Dossier Quality And Cost- IDA / D4660 environment for private Post Open - National 35,000.00 27,479.02 Signed 2020-01-24 2020-01-24 2020-01-29 2020-01-25 2020-02-25 2020-03-17 2020-03-26 2020-05-20 2020-04-02 2020-04-24 2020-04-19 2020-05-05 2020-05-13 2020-05-19 2020-07-12 d’exécution, du dossier Based Selection sector development d'appel d'offres (DAO) et le suivi de travaux de réhabilitation du bâtiment de la justice commerciale MR-PEPHAN-145320-CS- QCBS / Réalisation d’une Developing a sustainable étude d’identification d’un Quality And Cost- IDA / D4660 seafood cluster in Post Open - International 70,000.00 0.00 Canceled 2020-03-06 2020-03-27 2020-05-10 2020-06-07 2020-07-07 2020-08-11 2020-09-15 2021-09-15 plan de récupération des Based Selection Nouadhibou huiles et lubrifiants usagers à des fins d’exportation MR-PEPHAN-233234-CS- CQS / Recrutement d'une firme pour assurer la Strengthening the enabling Consultant Under campagne de communication IDA / D4660 environment for private Post Qualification Open - National 30,000.00 0.00 2021-05-14 2021-06-04 2021-05-29 2021-06-10 2021-06-05 2021-06-15 2021-06-30 2021-09-28 Implementation (publications, tv, réseaux sector development Selection sociaux, supports imprimés, ..) pour l'APIM MR-PEPHAN-233239-CS- CQS / Recrutement d’une Strengthening the enabling Consultant Pending firme pour l’appui à IDA / D4660 environment for private Post Qualification Open - International 200,000.00 0.00 2021-05-10 2021-05-15 2021-06-13 2021-06-16 2021-06-30 2021-09-28 Implementation l’élaboration de la Stratégie de sector development Selection l’APIM Page 5 MR-PEPHAN-233246-CS- INDV / Recrutement d’un Consultant pour une Assistance Technique pour appuyer l'AZFN et la DPPP Strengthening the enabling Consultant Under pour la structuration du projet IDA / D4660 environment for private Post Qualification Open - International 30,000.00 0.00 2021-05-10 2021-05-20 2021-05-15 2021-05-21 2021-06-05 2021-06-10 2021-06-24 2021-10-31 Implementation en PPP et la réalisation des sector development Selection études d'évaluation préalable et de soutenabilité budgétaire du projet de traitement des eaux usées du se MR-PEPHAN-233249-CS- CQS / Recrutement d’un Consultant pour une AT pour appuyer la DPPP dans la structuration du projet en PPP Strengthening the enabling Consultant Under et la réalisation des études IDA / D4660 environment for private Post Qualification Open - International 60,000.00 0.00 2021-05-10 2021-05-20 2021-05-17 2021-06-07 2021-06-12 2021-06-26 2021-10-31 Implementation d'évaluation préalable et de sector development Selection soutenabilité budgétaire du projet de construction et exploitation d’un complexe intégré́ de sucre MR-PEPHAN-152362-CS- CQS / Recrutement d'un consultant pour l’étude de Strengthening the enabling Quality And Cost- faisabilité en PPP du projet IDA / D4660 environment for private Post Open - National 200,000.00 0.00 Canceled 2019-12-31 2020-01-09 2020-01-21 2020-01-09 2020-03-05 2020-07-15 2020-04-02 2020-05-02 2020-06-06 2020-07-11 2021-01-07 Based Selection d’Alimentation en Eau Potable sector development de la Zone Nord de la Mauritanie INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 03-PAZF-SC-2016 / Formation sur les techniques de mediation et de Developing a sustainable Individual conciliation et redaction dun IDA / D1040 seafood cluster in Post Consultant Limited 20,000.00 20,000.00 Completed 2016-07-01 2015-04-16 2016-07-06 2017-01-17 2016-07-27 2016-12-01 2016-08-31 2017-01-05 2017-02-27 2017-02-03 guide pratique sur les Nouadhibou Selection procedures extra juridictionnelles 05-PAZF-SC-2016 / Developing a sustainable Individual Recrutement un consultant IDA / D1040 seafood cluster in Post Consultant Limited 10,000.00 7,945.22 Completed 2016-08-15 2016-04-27 2016-08-20 2016-08-29 2016-09-10 2016-10-19 2016-10-15 2016-11-18 2017-04-13 2016-12-13 archiviste pour appuyer la Nouadhibou Selection CPMC 08-PAZF-SC-2016 / Elaboration dun guide Developing a sustainable Individual pratique du droit des affaires IDA / D1040 seafood cluster in Post Consultant Limited 10,000.00 9,315.08 Completed 2016-10-03 2015-04-16 2016-10-08 2016-10-25 2016-10-29 2016-11-15 2016-12-03 2016-12-07 2017-06-01 2017-03-07 applicable dans la Zone Nouadhibou Selection Franche de Nouadhibou 04-PAZF-SC-2016 / Developing a sustainable Individual Recrutement dun expert pour IDA / D1040 seafood cluster in Prior Consultant Limited 15,000.00 0.00 Canceled 2016-07-15 2016-07-20 2016-08-10 2016-09-14 2017-03-13 rediger les TRS des activites Nouadhibou Selection de planification spatiale 04-1-PAZF-SC-2016 / Developing a sustainable Individual Recrutement dun expert pour Pending IDA / D1040 seafood cluster in Post Consultant Open 15,000.00 0.00 2016-11-15 2017-01-03 2017-01-24 2017-02-28 2017-08-27 rediger les TRS des activites Implementation Nouadhibou Selection de planification spatiale 14-PAZF-SC-2016 / SOUTIEN Increasing the value of A L ETABLISSEMENT GUICHET seafood products produced Individual UNIQUE POUR LA IDA / D1040 and marketed in the seafood Prior Consultant Limited 50,000.00 0.00 Canceled 2016-09-01 2016-09-06 2016-09-27 2016-11-01 2017-04-30 FACILITATION DES cluster with the participation Selection EXPORTATIONS-POISON FRAIS of local acto rs A NOUADIBOU- 14-1-PAZF-SC-2016 / Increasing the value of SOUTIEN A L ÉTABLISSEMENT seafood products produced Individual GUICHET UNIQUE POUR LA IDA / D1040 and marketed in the seafood Post Consultant Open 50,000.00 40,000.00 Completed 2016-11-01 2017-10-30 2016-12-20 2018-02-12 2017-01-10 2018-05-31 2017-02-14 2018-06-06 2017-08-13 2018-08-28 FACILITATION DES cluster with the participation Selection EXPORTATIONS-POISON FRAIS of local acto rs A NOUADHIBOU- MR-PEPHAN-23991-CS-INDV / Recrutement d'un expert Developing a sustainable Individual pour la rédaction du manuel IDA / D1040 seafood cluster in Post Consultant Open 50,000.00 19,150.00 Completed 2017-09-24 2015-04-07 2017-11-12 2015-08-10 2017-12-03 2015-08-21 2018-01-07 2015-08-25 2018-07-06 2016-06-23 des opérations (exécution et Nouadhibou Selection procédures) MR-PEPHAN-24036-CS-INDV Developing a sustainable Individual / Etude d’impact IDA / D1040 seafood cluster in Post Consultant Limited 30,000.00 25,800.00 Completed 2015-12-09 2015-12-02 2015-12-14 2015-12-02 2016-01-04 2015-12-05 2016-02-08 2015-12-14 2016-08-06 2016-02-01 environnemental et social Nouadhibou Selection MR-PEPHAN-24028-CS-INDV / Recrutement d’un Developing a sustainable Individual consultant pour le soutien a la IDA / D1040 seafood cluster in Post Consultant Limited 25,000.00 15,290.60 Completed 2016-02-01 2015-11-30 2016-02-06 2016-01-24 2016-02-27 2016-02-08 2016-04-02 2016-02-09 2016-09-29 2016-06-02 conformité des PME et Nouadhibou Selection entreprises informelles  MR-PEPHAN-24070-CS-CDS / Recrutement d'un Cabinet Developing a sustainable international pour la revision IDA / D1040 seafood cluster in Prior Direct Selection Direct 50,000.00 64,954.00 Completed 2016-04-23 2017-08-24 2016-05-03 2016-07-07 2016-06-13 2017-01-03 2016-11-17 du cadre juridique et Nouadhibou institutionnel des PPP MR-PEPHAN-24758-CS-CDS Developing a sustainable / Assistance technique IDA / D1040 seafood cluster in Prior Direct Selection Direct 15,000.00 23,013.73 Completed 2015-03-15 2017-08-25 2015-03-25 2015-05-29 2016-05-02 2015-11-25 2016-10-18 opérationnelle au suivi de la Nouadhibou stratégie DPH MR-PEPHAN-24759-CS-CDS / Recrutement d’un cabinet Developing a sustainable international pour la rédaction IDA / D1040 seafood cluster in Prior Direct Selection Direct 61,000.00 60,624.00 Completed 2017-03-13 2017-08-25 2017-03-23 2017-05-27 2017-03-16 2017-11-23 2020-03-05 des décrets d’application de la Nouadhibou loi relative aux PPP en Mauritanie. Page 6 16-PAZF-SC-2016 / Soutien à l'ANZF dans la mise en Developing a sustainable Individual œuvre du Projet : Recrutement IDA / D1040 seafood cluster in Prior Consultant Limited 60,000.00 0.00 Canceled 2016-11-01 2016-11-06 2016-11-27 2017-01-01 2017-06-30 d'un spécialiste en suivi- Nouadhibou Selection évaluation MR-PEPHAN-24755-CS-CDS / Recrutement d’un cabinet international pour Developing a sustainable l’élaboration d’une étude IDA / D1040 seafood cluster in Prior Direct Selection Direct 65,000.00 65,000.00 Completed 2017-03-13 2017-10-10 2017-03-23 2017-02-15 2017-05-27 2017-03-21 2017-11-23 2017-04-06 financière complète pour le Nouadhibou terminal pétrolier de Nouadhibou Nouakchott MR-PEPHAN-36704-CS-CDS / Recrutement d'un consultant individuel pour appuyer la Coordination du Projet de Pôle Increasing the value of Halieutique de Nouadhibou et seafood products produced la Direction du Guichet IDA / D1040 and marketed in the seafood Prior Direct Selection Direct 5,000.00 4,712.60 Completed 2017-11-20 2017-12-07 2017-11-30 2018-01-14 2018-01-05 2018-05-10 2018-03-06 2019-10-15 Unique de la Zone Franche cluster with the participation pour la finalisation des termes of local acto rs de référence de l'étude diagnostique des besoins pour la MR-PEPHAN-48853-CS-CDS / Recrutement d'un Increasing the value of Consultant pour la réalisation seafood products produced d'une Etude d'Impact IDA / D1040 and marketed in the seafood Prior Direct Selection Direct 15,000.00 20,640.00 Completed 2018-02-16 2018-06-04 2018-02-26 2018-08-13 2018-04-22 2018-09-04 2018-05-22 2019-03-05 Environnemental et Social cluster with the participation (EIES) pour une voierie dans le of local acto rs Pôle de compétitivité Halieutique de Nouadhibou MR-PEPHAN-25565-CS-INDV Developing a sustainable Individual / Recrutement dun consultant IDA / D1040 seafood cluster in Post Consultant Limited 5,000.00 0.00 Canceled 2017-10-02 2017-10-07 2017-10-28 2017-12-02 2018-05-31 en communication et Nouadhibou Selection infographie 09-PAZF-SC-2016 / Etude Developing a sustainable Individual regime foncier du pole IDA / D1040 seafood cluster in Post Consultant Limited 20,000.00 0.00 Canceled 2016-12-01 2016-12-06 2016-12-27 2017-01-31 2017-07-30 halieutique de la zone franche Nouadhibou Selection MR-PEPHAN-24393-CS-CDS Developing a sustainable / Soutien à l'ANZF dans la IDA / D1040 seafood cluster in Prior Direct Selection Direct 60,000.00 0.00 Canceled 2015-05-02 2015-05-12 2015-07-16 2016-01-12 mise en œuvre du Projet : Nouadhibou Sélection Coordinateur MR-PEPHAN-24008-CS-CDS Developing a sustainable / numerisation des archives IDA / D1040 seafood cluster in Prior Direct Selection Direct 25,000.00 0.00 Canceled 2015-12-11 2017-08-25 2015-12-21 2016-02-24 2016-08-22 foncieres de l'ANZF Nouadhibou MR-PEPHAN-24210-CS-INDV / Soutien l'ANZF dans la mis Developing a sustainable Individual en œuvre du projet : IDA / D1040 seafood cluster in Prior Consultant Limited 60,000.00 0.00 Canceled 2017-01-13 2017-01-18 2017-02-08 2017-03-15 2017-09-11 recrutement d'un expert Nouadhibou Selection Suivi&Evaluation coordinateur adjoint MR-PEPHAN-24064-CS-CDS / Assistance technique pour l'elaboration d'un cadre juridique devant regir la Increasing the value of delegation de seafood products produced gestion(convention IDA / D1040 and marketed in the seafood Prior Direct Selection Direct 30,000.00 0.00 Canceled 2015-11-26 2017-11-10 2015-12-06 2016-02-09 2016-08-07 speciale)accordée au Port cluster with the participation Autonome de Nouadhibou of local acto rs dans le cadre de la Zonz Franche e Nouadhibou( expert en organisation de réforme) MR-PEPHAN-24745-CS-CDS / Assistance technique pour Increasing the value of l'elaboration d'un cadre seafood products produced juridique devant regir la IDA / D1040 and marketed in the seafood Prior Direct Selection Direct 20,000.00 0.00 Canceled 2015-11-26 2017-08-25 2015-12-06 2016-02-09 2016-08-07 delegation de cluster with the participation gestion(convention speciale) of local acto rs accordée au PAN MR-PEPHAN-24945-CS-INDV / Soutien l'ANZF dans la mis Developing a sustainable Individual en œuvre du projet : IDA / D1040 seafood cluster in Prior Consultant Limited 60,000.00 0.00 Canceled 2016-11-01 2016-11-06 2016-11-27 2017-01-01 2017-06-30 recrutement d'un expert Nouadhibou Selection environnementale MR-PEPHAN-25676-CS-INDV / Soutien ANZF dans la mise Developing a sustainable Individual en œuvre du projet: IDA / D1040 seafood cluster in Prior Consultant Open 60,000.00 0.00 Canceled 2015-08-17 2015-10-05 2015-10-26 2015-11-30 2016-05-28 Specialiste en gestuin Nouadhibou Selection financiere MR-PEPHAN-25675-CS-INDV / Soutien ANZF dans la mise Developing a sustainable Individual en œuvre du projet: IDA / D1040 seafood cluster in Prior Consultant Open 60,000.00 0.00 Canceled 2015-08-13 2015-10-01 2015-10-22 2015-11-26 2016-05-24 Specialiste en passation de Nouadhibou Selection marches 06-PAZF-SC-2016 / Recrutement dun consultant Developing a sustainable Individual national pour l appui au IDA / D1040 seafood cluster in Post Consultant Limited 36,000.00 0.00 Canceled 2016-07-01 2016-07-06 2016-07-27 2016-08-31 2017-02-27 comite technique en charge Nouadhibou Selection des PPP MR-PEPHAN-24943-CS-INDV / Recrutement d’un Developing a sustainable Individual Consultant chargé du suivi de IDA / D1040 seafood cluster in Post Consultant Limited 15,000.00 0.00 Canceled 2015-03-03 2015-03-08 2015-03-29 2015-05-03 2015-10-30 la mise en œuvre des actions Nouadhibou Selection de réformes Doing Businesss, MR-PEPHAN-24503-CS-INDV / Recrutement d'un chargé de Developing a sustainable Individual la communication sur les IDA / D1040 seafood cluster in Post Consultant Limited 15,000.00 0.00 Canceled 2017-09-21 2015-03-03 2017-09-26 2015-04-09 2017-10-17 2015-04-10 2017-11-21 2018-05-20 avantages des réforme Doing Nouadhibou Selection Business Page 7 MR-PEPHAN-24939-CS-INDV Developing a sustainable Individual / Recrutement d’un expert IDA / D1040 seafood cluster in Post Consultant Limited 15,000.00 0.00 Canceled 2015-03-03 2015-03-08 2015-03-29 2015-05-03 2015-10-30 chargé du système Nouadhibou Selection d’information MR-PEPHAN-24005-CS-INDV / Soutien à l’ANZF dans la Developing a sustainable Individual mise en œuvre du Projet : IDA / D1040 seafood cluster in Post Consultant Open 50,000.00 0.00 Canceled 2015-07-22 2015-09-09 2015-09-30 2015-11-04 2016-05-02 Recrutement coach pour le Nouadhibou Selection pole halieutique MR-PEPHAN-24209-CS-INDV / Recrutement d'un consultant Developing a sustainable Individual international pour l'assistance IDA / D1040 seafood cluster in Post Consultant Open 30,000.00 0.00 Canceled 2015-03-03 2015-04-21 2015-05-12 2015-06-16 2015-12-13 technique à la DGPSP en Nouadhibou Selection matière de Doing Business MR-PEPHAN-25621-CS-INDV / Assistance technique Developing a sustainable Individual international pour le IDA / D1040 seafood cluster in Post Consultant Open 60,000.00 0.00 Canceled 2015-09-15 2015-11-03 2015-11-24 2015-12-29 2016-06-26 recrutement d' un consultant Nouadhibou Selection pour le DB MR-PEPHAN-73925-CS-INDV Developing a sustainable Individual / Recrutement d'un consultant IDA / D1040 seafood cluster in Post Consultant Limited 25,000.00 0.00 Canceled 2018-08-20 2018-08-16 2018-08-25 2018-08-29 2018-09-15 2018-10-20 2021-10-19 individuel pour l'audit interne Nouadhibou Selection du projet MR-PEPHAN-73926-CS-INDV Developing a sustainable Individual / Recrutement d'un consultant IDA / D1040 seafood cluster in Post Consultant Limited 10,000.00 0.00 Canceled 2018-09-24 2018-09-29 2018-10-20 2018-11-24 2019-05-23 individuel pour la révision du Nouadhibou Selection manuel de procédures MR-PEPHAN-104366-CS- Developing a sustainable Individual INDV / Recrutement d'un IDA / D1040 seafood cluster in Post Consultant Open 30,000.00 16,148.57 Signed 2018-08-16 2019-01-25 2018-10-04 2019-06-11 2018-10-25 2019-06-19 2018-11-29 2019-07-01 2019-05-28 consultant individuel pour Nouadhibou Selection l'audit interne du projet MR-PEPHAN-93142-CS-INDV Developing a sustainable Individual / Recrutement d'un consultant IDA / D1040 seafood cluster in Post Consultant Limited 10,000.00 8,020.46 Completed 2019-04-01 2019-05-16 2019-04-06 2019-05-16 2019-04-27 2019-06-19 2019-06-01 2019-07-01 2019-11-28 2019-12-11 individuel pour la révision du Nouadhibou Selection manuel de procédures MR-PEPHAN-120303-CS- INDV / Recrutement d’un Developing a sustainable Individual Responsable de Suivi & IDA / D1040 seafood cluster in Post Consultant Open 50,000.00 30,870.68 Signed 2019-07-31 2019-06-29 2019-09-18 2019-07-16 2019-10-09 2019-07-22 2019-11-13 2019-07-23 2020-10-28 Évaluation pour le compte du Nouadhibou Selection PEPHN MR-PEPHAN-120304-CS- INDV / Recrutement d’un Developing a sustainable Individual Responsable Administratif et IDA / D1040 seafood cluster in Post Consultant Open 50,000.00 2,540.79 Terminated 2019-07-30 2019-07-06 2019-09-17 2019-09-10 2019-10-02 2019-09-13 2019-11-06 2019-10-07 2020-10-21 Financier pour le compte du Nouadhibou Selection PEPHN MR-PEPHAN-135727-CS- INDV / Recrutement d’un Increasing the value of consultant individuel pour seafood products produced Individual l'appui au développement des IDA / D1040 and marketed in the seafood Post Consultant Open 150,000.00 111,808.49 Signed 2019-10-01 2019-09-26 2019-11-04 2020-02-06 2019-11-14 2020-02-27 2019-11-29 2020-03-18 2021-11-18 capacités des opérateurs cluster with the participation Selection économiques du secteur de la of local acto rs pêche à Nouadhibou. MR-PEPHAN-135731-CS- INDV / Recrutement d’un Increasing the value of consultant individuel pour seafood products produced Individual appuyer la sous-commission IDA / D1040 and marketed in the seafood Post Consultant Limited 7,000.00 6,418.83 Completed 2019-09-30 2019-07-10 2019-10-02 2019-07-16 2019-10-04 2019-07-12 2019-10-07 2019-07-23 2020-01-05 2019-11-04 d’Analyse de l’ANZF durant cluster with the participation Selection tout le processus de of local acto rs l’évaluation des propositions techniques reçues MR-PEPHAN-145481-CS- INDV / Recrutement d'un consultant indivduel pour Developing a sustainable Individual Pending appuyer l’Autorité de la Zone IDA / D4660 seafood cluster in Post Consultant Open 35,000.00 0.00 2020-03-01 2020-04-19 2020-05-10 2020-06-14 2020-12-11 Implementation Franche de Nouadhibou dans Nouadhibou Selection la mise en place d’un cadre PPP MR-PEPHAN-145483-CS- INDV / Recrutement d'un Developing a sustainable Individual consultant individuel, expert IDA / D4660 seafood cluster in Post Consultant Open 35,000.00 45,000.00 Signed 2020-01-07 2020-04-19 2020-02-25 2020-07-14 2020-03-17 2020-07-22 2020-04-21 2020-08-25 2020-10-18 pêche pour appuyer l’ANZF Nouadhibou Selection dans la promotion du secteur halieutique MR-PEPHAN-145325-CS- Increasing the value of INDV / Appui à la certification seafood products produced Individual Pending du sel, produit par les IDA / D4660 and marketed in the seafood Post Consultant Open 45,000.00 0.00 2020-04-14 2020-06-02 2020-06-23 2020-07-28 2021-01-24 Implementation cooperatives feminines (par cluster with the participation Selection l’ONISPA) of local acto rs MR-PEPHAN-145285-CS- INDV / Recrutement d'un consultant pour la supervision Strengthening the enabling Individual de développement des IDA / D4660 environment for private Post Consultant Open 30,000.00 21,240.14 Signed 2020-01-20 2020-01-14 2020-03-09 2020-04-22 2020-03-30 2020-04-29 2020-05-04 2020-05-12 2020-10-31 systèmes pour les registres sector development Selection commerciaux (registre central, Nouakchott et Nouadhibou) et la justice commerciale MR-PEPHAN-145339-CS- Strengthening the enabling Individual INDV / Etude d'impact des Pending IDA / D4660 environment for private Post Consultant Open 30,000.00 0.00 2020-01-26 2020-03-15 2020-04-05 2020-05-10 2020-11-06 reformes déjà effectuées sur Implementation sector development Selection le climat des affaires Page 8 MR-PEPHAN-145322-CS- INDV / Recrutement d’un consultant individuel pour Strengthening the enabling Individual Pending assister le comité technique IDA / D4660 environment for private Post Consultant Open 35,000.00 0.00 2020-01-28 2020-03-17 2020-04-07 2020-05-12 2020-11-08 Implementation public privé dans la réforme sector development Selection relative au commerce transfrontalier. MR-PEPHAN-145291-CS- INDV / Recrutement d'un Strengthening the enabling Individual consultant (suivi-évaluation) IDA / D4660 environment for private Post Consultant Open 40,000.00 0.00 Canceled 2020-01-28 2020-01-10 2020-03-17 2020-04-07 2020-05-12 2020-11-08 pour appuyer le Comité sector development Selection Technique du climat des affaires MR-PEPHAN-145326-CS- Individual INDV / Recrutement d'un Pending IDA / D4660 Project management Post Consultant Open 6,000.00 0.00 2020-08-19 2020-10-07 2020-10-28 2020-12-02 2021-05-31 fournisseur de service sur le Implementation Selection VBG MR-PEPHAN-145198-CS- Increasing the value of CDS / Recrutement d'une ONG seafood products produced Pending pour Appuyer à l’organisation IDA / D4660 and marketed in the seafood Post Direct Selection Direct 60,000.00 0.00 2020-05-15 2020-05-25 2020-07-29 2021-01-25 Implementation des activités des femmes en cluster with the participation coopératives of local acto rs MR-PEPHAN-145196-CS- CDS / Formations (plusieurs sessions) aux coopératives Increasing the value of locales de femmes en seafood products produced marketing et organisationnel IDA / D4660 and marketed in the seafood Post Direct Selection Direct 160,000.00 0.00 Canceled 2020-01-15 2020-01-09 2020-01-25 2020-01-09 2020-03-30 2020-09-26 (formation au leadership cluster with the participation personnel destinée aux of local acto rs femmes travaillant dans le secteur de la pêche à Nouadhibou MR-PEPHAN-145200-CS- CDS / Recrutement d'un Strengthening the enabling bureau d'étude pour le suivi IDA / D4660 environment for private Post Direct Selection Direct 16,000.00 0.00 Canceled 2020-06-15 2020-06-25 2020-08-29 2021-02-25 de travaux de réhabilitation sector development du bâtiment de la justice commerciale MR-PEPHAN-145276-CS- INDV / Recrutement d’un consultant individuel pour Strengthening the enabling Individual assister le comité technique IDA / D4660 environment for private Post Consultant Open 35,000.00 0.00 Canceled 2020-01-29 2019-12-18 2020-03-18 2020-04-08 2020-05-13 2020-11-09 public privé dans la réforme sector development Selection relative au justice commerciale MR-PEPHAN-156258-CS- INDV / Recrutement d’un consultant individuel pour Strengthening the enabling Individual assister le comité technique IDA / D4660 environment for private Post Consultant Limited 35,000.00 44,378.95 Signed 2020-02-10 2020-01-29 2020-02-15 2020-04-11 2020-03-07 2020-04-27 2020-04-11 2020-05-12 2020-10-08 public privé dans la réforme sector development Selection relative au justice commerciale MR-PEPHAN-156263-CS- INDV / Réalisation d’une Developing a sustainable Individual étude d’identification d’un IDA / D4660 seafood cluster in Post Consultant Limited 40,000.00 31,070.39 Completed 2020-02-10 2020-01-30 2020-02-15 2020-04-29 2020-03-07 2020-05-20 2020-04-11 2020-06-03 2020-05-23 2020-12-08 plan de récupération des Nouadhibou Selection huiles et lubrifiants usagers à des fins d’exportation MR-PEPHAN-157545-CS- INDV / Recrutement d’un cabinet international pour la modification de la loi 2017- 006 relative au PPP et ses Strengthening the enabling textes d’application à l’effet IDA / D4660 environment for private Post Direct Selection Direct 35,000.00 34,618.00 Signed 2020-02-06 2020-02-18 2020-02-16 2020-02-24 2020-03-31 2020-03-11 2020-05-30 d’intégrer dans son périmètre sector development la ZFN et d’harmoniser les règles relatives aux compétences de l’Autorité de Régulation MR-PEPHAN-168973-CS- INDV / Assistance technique pour la traduction des textes Strengthening the enabling Individual juridique de la feuille de route IDA / D4660 environment for private Post Consultant Limited 15,000.00 9,991.67 Completed 2020-04-16 2020-04-16 2020-04-23 2020-04-24 2020-05-03 2020-04-30 2020-05-24 2020-05-13 2020-11-20 2020-11-24 des réformes Doing Business sector development Selection 2020\2021 et des textes de la justice commerciale MR-PEPHAN-170210-CS- CDS / Recrutement d’un Assistant Technique pour le Strengthening the enabling Individual Suivi-Evaluation de mise en IDA / D4660 environment for private Post Consultant Direct 40,000.00 42,380.43 Signed 2020-04-30 2020-05-12 2020-05-20 2020-05-12 2020-06-10 2021-01-28 2020-07-09 2021-02-10 2021-07-04 œuvre de la feuille de route sector development Selection des réformes Doing Business 2021-2022 MR-PEPHAN-207659-CS- INDV / Recrutement d’un Individual Under Responsable Administratif et IDA / D4660 Project management Post Consultant Open 35,000.00 0.00 2020-12-07 2020-12-14 2021-01-09 2021-01-23 2021-02-07 2021-12-04 Implementation Financier pour le compte du Selection PEPHN MR-PEPHAN-145283-CS- Strengthening the enabling Individual INDV / Recrutement d'un IDA / D4660 environment for private Post Consultant Open 4,000.00 0.00 Canceled 2020-01-29 2020-03-18 2020-04-08 2020-05-13 2020-11-09 consultant pour la supervision sector development Selection de développement du SI du GU MR-PEPHAN-216415-CS- CDS / Recrutement d'un cabinet pour Strengthening the enabling Under l’opérationnalisation du projet IDA / D4660 environment for private Post Direct Selection Direct 32,000.00 0.00 2021-02-25 2021-03-03 2021-03-09 2021-09-05 Implementation de loi modificative de la loi sector development 2017-006 relative au Partenariat Public-Privé Page 9 MR-PEPHAN-230567-CS- INDV / Recrutement d'un Individual Under Responsable de passation des IDA / D4660 Project management Post Consultant Limited 23,750.00 0.00 2021-04-27 2021-04-27 2021-05-02 2021-05-09 2021-05-22 2021-12-30 Implementation marchés pour le compte du Selection PEPHN MR-PEPHAN-145205-CS- CDS / Recrutement d’un consultant individuel pour Strengthening the enabling Individual assister le comité technique IDA / D4660 environment for private Post Consultant Limited 30,000.00 0.00 Canceled 2020-05-03 2020-05-08 2020-05-29 2020-07-03 2020-12-30 public privé dans la réforme sector development Selection relative au permis de construire. MR-PEPHAN-145211-CS- Strengthening the enabling Individual INDV / Etude d'évaluation du IDA / D4660 environment for private Post Consultant Open 30,000.00 0.00 Canceled 2020-01-15 2020-03-04 2020-03-25 2020-04-29 2020-10-26 dispositif national d'incitation sector development Selection à l'investissement MR-PEPHAN-233231-CS- INDV / Recrutement d'un consultant individuel pour Developing a sustainable Individual Pending appuyer l’Autorité de la Zone IDA / D4660 seafood cluster in Post Consultant Limited 35,000.00 0.00 2021-05-21 2021-05-26 2021-05-31 2021-06-14 2021-10-12 Implementation Franche de Nouadhibou dans Nouadhibou Selection la mise en place d’un cadre PPP MR-PEPHAN-233237-CS- INDV / Recrutement d'un Strengthening the enabling Individual Pending consultant individuel pour la IDA / D4660 environment for private Post Consultant Limited 6,000.00 0.00 2021-05-14 2021-05-19 2021-05-24 2021-06-23 2021-08-22 Implementation création d’un site web sector development Selection trilingue pour l'APIM MR-PEPHAN-233244-CS- INDV / Recrutement d'un consultant individuel pour la réalisation d’une étude à Strengthening the enabling Individual Pending grande échelle pour IDA / D4660 environment for private Post Consultant Limited 35,000.00 0.00 2021-05-19 2021-05-24 2021-06-03 2021-07-06 2021-10-04 Implementation l’identification, le chiffrage de sector development Selection l’ampleur et de la composition du secteur informel et des obstacles à la formalisation MR-PEPHAN-233251-CS- INDV / Recrutement d’un Expert en assainissement halieutique chargé de Strengthening the enabling Individual Pending participer à la rédaction du IDA / D4660 environment for private Post Consultant Limited 30,000.00 0.00 2021-05-17 2021-05-22 2021-05-29 2021-06-12 2021-10-31 Implementation Dossier de Consultation du sector development Selection projet de traitement des eaux usées du secteur de la pêche de Nouadhibou MR-PEPHAN-233241-CS- INDV / Recrutement d'un Strengthening the enabling Individual consultant individuel pour la IDA / D4660 environment for private Post Consultant Direct 15,000.00 0.00 Under Review 2021-05-14 2021-05-06 2021-05-20 2021-05-23 2021-05-26 2021-10-31 traduction des textes sector development Selection juridiques Doing Business MR-PEPHAN-236061-CS- CDS / Recrutement d’une firme pour l’appui à Strengthening the enabling Under élaboration de la stratégie de IDA / D4660 environment for private Post Direct Selection Direct 220,000.00 0.00 2021-05-27 2021-06-03 2021-05-31 2021-06-07 2021-06-09 2021-10-31 Implementation l’Agence de Promotion des sector development Investissements en Mauritanie (APIM) Page 10 Third Village Investment Project (P146970) PROCUREMENT Kyrgyz Republic : Third Village Investment Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2019-12-17 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146970 GPN Date: Project Name: Third Village Investment Project Loan / Credit No: IDA / 56010, IDA / D0410 Community Development and Investment Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IDA-VIP3-HO-CW-16-05 / Construction of a Capacity Building of Local Single Stage - One kindergarten for 100 places in IDA / 56010 Self-Governments and Prior Request for Bids Open - National 0.00 347,529.04 Signed 2016-10-03 2016-09-30 2016-10-19 2016-10-19 Envelope Tosor v., Tamga AO, Jeti- Communities Oguz Raion, Issyk-Kul Region IDA-VIP3-HO-CW-NCB-20-1 / Construction of an additional building for Single Stage - One 2021-01- IDA / D0410 Village Investments Post Request for Bids Open - National 152,173.91 132,012.63 Signed 2020-03-25 2020-04-17 2020-03-30 2020-05-11 2020-05-11 2020-06-10 2020-06-11 2020-07-15 2020-06-30 "Zhetigen" Kindergarten in Envelope 11 Beryu-Bash village, Ak-Suu region, Issyk-Kul oblast IDA-VIP3-HO-CW-NCB-20-2 / Construction of a Single Stage - One 2021-01- kindergarten for 100 places IDA / D0410 Village Investments Post Request for Bids Open - National 143,500.00 468,937.48 Signed 2020-03-25 2020-04-17 2020-03-30 2020-05-11 2020-05-11 2020-06-10 2020-06-11 2020-07-15 2020-07-29 Envelope 11 Ak-Sai village, Ton region, Issyk-Kul oblast IDA-VIP3-HO-CW-NCB-20-3 / Construction of a Single Stage - One 2020-12- kindergarten for 50 places IDA / D0410 Village Investments Post Request for Bids Open - National 254,130.43 222,477.40 Signed 2020-02-21 2020-03-06 2020-02-26 2020-03-06 2020-04-08 2020-05-06 2020-05-08 2020-07-15 2020-06-12 2020-08-11 Envelope 09 Zherge-Tal village, Ak-Tala region, Naryn oblast IDA-VIP3-HO-CW-SH-20-3 / Construction of FAP in Kyzyl- Request for Single Stage - One 2020-10- IDA / D0410 Village Investments Post Limited 28,418.48 31,135.12 Signed 2020-02-26 2020-02-21 2020-04-22 2020-03-16 Zhyldyz village, Zhumgal Quotations Envelope 19 region, Naryn oblast IDA-VIP3-HO-CW-NCB-20-4 / Construction of a Single Stage - One 2020-12- kindergarten for 50 places IDA / D0410 Village Investments Post Request for Bids Open - National 182,608.70 217,340.32 Signed 2020-02-24 2020-03-06 2020-02-29 2020-03-06 2020-04-11 2020-05-06 2020-05-11 2020-06-09 2020-06-15 2020-08-13 Envelope 12 Zher-Kechkyu village, Naryn region, Naryn oblast IDA-VIP3-HO-CW-SH-20-6 / Construction of FAP in Request for Single Stage - One 2020-11- IDA / D0410 Village Investments Post Limited 30,434.78 38,072.83 Signed 2020-03-30 2020-05-07 2020-05-25 2020-07-20 Tamchy-Bulak village, Kara- Quotations Envelope 21 Buura region, Talas oblast IDA-VIP3-HO-CW-NCB-20-5 / Construction of a Single Stage - One 2020-12- IDA / D0410 Village Investments Post Request for Bids Open - National 258,695.65 205,590.46 Signed 2020-02-24 2020-03-06 2020-02-29 2020-03-06 2020-04-11 2020-08-05 2020-05-11 2020-08-13 2020-06-15 2020-08-20 kindergarten Ken-Aral village, Envelope 12 Bakai-Ata region, Talas oblast IDA-VIP3-HO-CW-NCB-20-6 / Construction of a Single Stage - One 2020-12- kindergarten A.Ogonbaev IDA / D0410 Village Investments Post Request for Bids Open - National 227,991.99 226,285.69 Signed 2020-02-24 2020-03-06 2020-02-29 2020-03-06 2020-04-11 2020-05-06 2020-05-11 2020-06-09 2020-06-15 2020-07-20 Envelope 12 village, Talas region, Talas oblast IDA-VIP3-HO-CW-NCB-20-7 / The device of a sewer collector and connection to a Single Stage - One 2021-02- IDA / D0410 Village Investments Post Request for Bids Open - National 259,730.35 204,040.06 Signed 2020-05-04 2020-08-21 2020-05-09 2020-06-20 2020-09-11 2020-07-20 2020-09-23 2020-08-24 2020-10-15 city network in Nijnealarcha Envelope 20 village, Alamudun region, Chui oblast IDA-VIP3-HO-CW-SH-20-7 / Asphalting of the road in Request for Single Stage - One 2020-11- IDA / D0410 Village Investments Post Limited 91,304.35 0.00 Canceled 2020-03-30 2020-05-25 Dayyrbek village, Issyk-Ata Quotations Envelope 21 region, Chui oblast IDA-VIP3-HO-CW-SH-20-5 / Construction of Library in Request for Single Stage - One 2020-11- IDA / D0410 Village Investments Post Limited 45,652.17 0.00 Canceled 2020-03-30 2020-05-25 Ottuk village, Naryn region, Quotations Envelope 21 Naryn oblast IDA-VIP3-HO-CW-SH-20-4 / Construction of FAP in Chon- Request for Single Stage - One 2020-11- IDA / D0410 Village Investments Post Limited 39,565.00 0.00 Canceled 2020-03-30 2020-05-25 Tash village, Tyup region, Quotations Envelope 21 Issyk-Kul oblast IDA-VIP3-HO-CW-NCB-20-8 / Construction of FAP in Chon- Single Stage - One 2020-08- IDA / 56010 Village Investments Post Request for Bids Open - National 76,475.00 79,907.89 Signed 2020-04-24 2020-05-13 2020-04-29 2020-05-12 2020-06-10 2020-06-03 2020-07-10 2020-06-24 2020-07-31 2020-08-03 Tash village, Tyup region, Envelope 15 Issyk-Kul oblast IDA-VIP3-HO-CW-NCB-20-9 / Construction of Library in Single Stage - One 2021-02- IDA / 56010 Village Investments Post Request for Bids Open - National 68,750.00 76,089.19 Signed 2020-04-27 2020-05-13 2020-05-02 2020-05-13 2020-06-13 2020-06-03 2020-07-13 2020-06-24 2020-08-17 2020-08-14 Ottuk village, Naryn region, Envelope 13 Naryn oblast IDA-VIP3-HO-CW-SH-20-1 / Overhaul of school them. Request for Single Stage - One 2020-08- Myrzakmatova in Kozhomkul IDA / 56010 Village Investments Post Open - National 35,431.00 29,222.97 Completed 2020-02-17 2020-04-02 2020-03-25 Quotations Envelope 30 village, Zhaiyl region, Chui oblast Page 1 IDA-VIP3-HO-CW-SH-20-2 / Overhaul of kindergarten in Request for Single Stage - One 2020-09- IDA / 56010 Village Investments Post Open - National 65,625.00 45,323.76 Completed 2020-02-17 2020-04-13 2020-03-27 Kaldyk village, Zhaiyl region, Quotations Envelope 10 Chui oblast IDA-VIP3-HO-CW-NCB-20- 10 / Construction of GSV in Single Stage - One 2021-04- IDA / D0410 Village Investments Post Request for Bids Open - National 102,958.00 91,295.42 Signed 2020-08-26 2020-09-04 2020-08-28 2020-09-18 2020-09-25 2020-10-18 2020-10-15 2020-11-15 2020-10-26 Ak-Dobo village Bakai-Ata Envelope 14 Ragion, Talas Oblast IDA-VIP3-HO-CW-NCB-20- 11 / Construction of Single Stage - One 2021-10- kindergarten for 100 places in IDA / 56010 Village Investments Post Request for Bids Open - National 519,484.00 401,429.27 Signed 2020-11-15 2020-12-02 2020-11-20 2020-12-02 2020-12-11 2020-12-23 2021-01-07 2021-01-26 2021-02-07 2021-02-25 Envelope 05 the Taldy-Suu village, Tup Ragion, Issyk-Kul oblast IDA-VIP3-HO-CW-NCB-20- 12 / Construction of Single Stage - One 2021-09- kindergarten for 50 places in IDA / 56010 Village Investments Post Request for Bids Open - National 225,269.99 216,423.55 Signed 2020-12-09 2020-12-16 2020-12-10 2020-12-16 2020-12-31 2021-01-06 2021-01-30 2021-02-01 2021-02-28 2021-02-22 Envelope 26 the Dobolu village, Naryn Ragion, Naryn oblast IDA-VIP3-HO-CW-NCB-20- 13 / Construction of Single Stage - One 2021-08- kindergarten for 50 places in IDA / 56010 Village Investments Post Request for Bids Open - National 225,707.41 215,418.47 Signed 2020-12-09 2020-12-16 2020-12-10 2020-12-16 2020-12-31 2021-01-06 2021-01-30 2021-02-05 2021-02-02 2021-02-19 Envelope 31 the Maymak village, Kara-Bura Ragion, Talas oblas IDA-VIP3-HO-CW-NCB-20- 14 / Repair of school in the Single Stage - One 2021-08- IDA / 56010 Village Investments Post Request for Bids Open - National 194,077.52 198,757.36 Signed 2020-12-16 2020-12-25 2020-12-18 2020-12-28 2021-01-08 2021-01-15 2021-02-07 2021-02-03 2021-03-14 2021-02-17 village Stavropolovka, Zhayil Envelope 11 rayon, Chui oblast IDA-VIP3-HO-CW-NCB-20- 15 / Repair of the drinking Single Stage - One 2021-09- water supply system in the IDA / 56010 Village Investments Post Request for Bids Open - National 67,751.00 62,516.80 Signed 2021-02-10 2021-02-12 2021-02-11 2021-02-11 2021-03-04 2021-03-05 2021-04-03 2021-04-02 2021-04-29 2021-04-26 Envelope 26 village. Kadyraly, Ak-Tala rayon, Naryn oblast IDA-VIP3-HO-CW-NCB-20- 16 / Installation of lighting on the streets in the villages Zher- Single Stage - One 2021-11- IDA / 56010 Village Investments Post Request for Bids Open - National 42,730.00 48,268.97 Signed 2021-03-19 2021-03-19 2021-03-19 2021-04-09 2021-05-09 2021-05-09 2021-05-06 2021-06-09 2021-05-21 Kazar, Nizhniy-Nooruz, Envelope 06 Druzhba Villages, Issyk-Ata Raion, Chuy Oblast IDA-VIP3-HO-CW-NCB-20- 17 / Major Repair drinking Under Single Stage - One 2021-11- water system in the village IDA / 56010 Village Investments Post Request for Bids Open - National 417,114.69 0.00 Implementat 2021-04-09 2021-04-09 2021-04-09 2021-04-09 2021-04-30 2021-04-30 2021-05-30 2021-06-28 Envelope 25 Jyrgalan Ak-Suu raijon Issyk- ion Kul oblast IDA-VIP3-HO-CW-NCB-20- 18 / Major repair of Single Stage - One 2021-11- kindergarten "ALENKA" in the IDA / 56010 Village Investments Post Request for Bids Open - National 294,029.83 0.00 Canceled 2021-04-02 2021-04-09 2021-04-02 2021-04-09 2021-04-23 2021-05-04 2021-05-23 2021-05-24 2021-06-23 Envelope 20 village Predtechenka Moscow rajion Chui oblast IDA-VIP3-HO-CW-NCB-20- 19 / Construction of FAPs`in Under the village Min-Bulak Bakai- Single Stage - One 2021-12- IDA / 56010 Village Investments Post Request for Bids Open - National 134,529.40 0.00 Implementat 2021-04-15 2021-04-23 2021-04-15 2021-04-23 2021-05-06 2021-05-14 2021-06-05 2021-07-06 Ata raijion Talas oblast and in Envelope 03 ion the village Min-Bulak Typ rajion Issyk-Kul oblast IDA-VIP3-HO-CW-NCB-20- 20 / Construction of FAPs`in Request for Bids - Pending the village Ak-Bulun Tup Single Stage - One Small Works SPD 2021-12- IDA / 56010 Village Investments Post Request for Bids Open - National 106,382.00 0.00 Implementat 2021-04-30 2021-04-30 2021-05-21 2021-06-20 2021-07-21 raijion Issyk-Kul oblast and in Envelope (1 envelope 18 ion the village Kaiyndy-Bulak Ak- process) Talaa rajion Naryn oblast IDA-VIP3-HO-CW-NCB-20- Request for Bids - 18/RT / Major repair of Under Single Stage - One Small Works SPD 2022-02- kindergarten "ALENKA" in the IDA / 56010 Village Investments Post Request for Bids Open - National 294,029.93 0.00 Implementat 2021-05-27 2021-05-28 2021-06-01 2021-06-22 2021-06-22 2021-07-22 2021-08-18 Envelope (1 envelope 14 village Predtechenka Moscow ion process) rajion Chui oblast GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-VIP3-HO-GOODS-SH-20- Under 3 / personal protective Request for Single Stage - One IDA / D0410 Village Investments Post Limited 99,800.00 0.00 Implementati 2020-04-24 2020-05-06 2020-05-08 2020-05-29 equipment for work in the Quotations Envelope on centers of COVID-19 IDA-VIP3-HO-EQ-NCB-20-7 / Purchase of special Single Stage - One IDA / 56010 Village Investments Post Request for Bids Open - National 91,304.00 117,736.29 Signed 2020-11-05 2020-11-06 2020-11-05 2020-11-06 2020-11-26 2020-11-27 2020-12-17 2020-12-09 2021-01-17 2020-12-28 2021-05-17 equipment for the removal of Envelope SHW Tuz AA, Chui oblast IDA-VIP3-HO-EQ-NCB-20-8 / Purchase of special Single Stage - One equipment for loading and IDA / 56010 Village Investments Post Request for Bids Open - National 87,296.00 72,307.85 Signed 2020-11-05 2020-11-06 2020-11-05 2020-11-06 2020-11-26 2020-11-27 2020-12-17 2020-12-10 2021-01-17 2020-12-28 2021-05-17 Envelope transporting goods Nurjanov AA, Talas oblast IDA-VIP3-HO-EQ-NCB-20-9 / Purchase of electrical Single Stage - One equipment for the IDA / 56010 Village Investments Post Request for Bids Open - National 68,500.00 0.00 Canceled 2020-11-04 2020-11-27 2020-11-04 2020-11-25 2020-12-18 2020-12-16 2020-12-29 2021-01-16 2021-03-17 Envelope reconstruction of VL-6-0,4 kV Kabak AA, Naryn oblast IDA-VIP3-HO-EQ-NCB-20- 9/RT1 / Purchase of electrical Pending Single Stage - One equipment for the IDA / 56010 Village Investments Post Request for Bids Open - National 68,500.00 0.00 Implementati 2021-01-18 2021-01-20 2021-02-10 2021-03-12 2021-04-14 2021-06-13 Envelope reconstruction of VL-6-0,4 kV on Kabak AA, Naryn oblast Page 2 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-VIP3-S-CQ-20-4 / Development of detailed design estimates for the Consultant installation of lighting on the IDA / D0410 Village Investments Post Qualification Open - National 15,000.00 31,208.89 Signed 2020-07-13 2020-07-14 2020-08-03 2020-09-07 2020-10-13 2020-09-14 2020-12-07 2020-09-28 2020-12-10 2020-12-27 streets of Zher-Kazar, Nizhniy- Selection Nooruz, Druzhba Villages, Issyk-Ata Raion, Chuy Oblast IDA-VIP3-S-CQ-20-5 / development of detailed design estimates for the capital repair of the drinking Consultant water sup-ply system in IDA / D0410 Village Investments Post Qualification Open - National 30,000.00 12,277.54 Signed 2020-07-13 2020-08-13 2020-08-03 2020-09-07 2020-09-11 2020-09-14 2020-10-28 2020-09-28 2020-10-28 2020-12-27 Zhyrgalan Village, Ak-Suy Selection Raion, Issyk-Kul Oblast and in Kadyraly Village, Ak-Talaa Raion, Naryn Oblast IDA-VIP3-S-CQ-20-6 / development of detailed design estimates for the Consultant capital repair of the building IDA / D0410 Village Investments Post Qualification Open - National 15,000.00 12,026.61 Signed 2020-07-13 2020-08-17 2020-08-03 2020-09-07 2020-10-15 2020-09-14 2020-11-16 2020-09-28 2020-12-07 2020-12-27 of the Alen-ka kindergarten in Selection the village of Predtechenka, Moskovskiy Raion, Chuy Oblast IDA-VIP3-V-CQ-2020-16 / Capacity Building of Local Consultant Preparing Audio and Video IDA / D0410 Self-Governments and Post Qualification Open - National 2,000.00 3,713.63 Signed 2020-08-18 2020-10-26 2020-09-08 2020-10-13 2020-10-23 2020-10-18 2020-11-17 2020-10-28 2020-12-07 2021-01-26 Lessons Communities Selection IDA-VIP-S-CQ-20-7 / development of detailed design estimates for the Consultant construction of the building IDA / D0410 Village Investments Post Qualification Open - National 15,000.00 0.00 Canceled 2020-07-24 2020-08-07 2020-09-13 2020-09-16 2020-09-18 2020-12-17 for the GFD (Group of Family Selection Doctors) in Ak-Dobo Village, Bakai-Ata Raion, Talas Oblast Capacity Building of Local Consultant IDA-VIP3-V-CQ-2021-1 / Under IDA / D0410 Self-Governments and Post Qualification Open - National 6,000.00 0.00 2021-03-29 2021-04-30 2021-04-19 2021-05-17 2021-05-20 2021-05-26 2021-08-24 Information Compaign Implementation Communities Selection IDA-VIP3-CQ-2021-2 / AF Capacity Building of Local Consultant Under VIP-3 Baseline survey and VIP- IDA / D0410 Self-Governments and Post Qualification Open - National 60,000.00 0.00 2021-05-28 2021-05-31 2021-06-11 2021-07-14 2021-07-19 2021-07-25 2021-11-22 Implementation 3 Impact Assessment Communities Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-VIP3-T-IC-2020-1 / Technical Supervision Individual Engineer (TSE) for subproject IDA / D0410 Village Investments Post Consultant Open 5,600.00 2,888.23 Signed 2020-02-26 2020-02-24 2020-04-15 2020-05-29 2020-05-06 2020-05-29 2020-06-10 2020-06-11 2020-12-07 ‘Construction of FAP in Kyzyl- Selection Zhyldyz village, Zhumgal region, Naryn oblast’ IDA-VIP3-T-IC-2020-2 / Technical Supervision Engineer (TSE) for subproject Individual ‘Overhaul of school them. IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 Canceled 2020-02-21 2020-02-18 2020-04-10 2020-05-01 2020-06-05 2020-12-02 Myrzakmatova in Kozhomkul Selection village, Zhaiyl region, Chui oblast’ IDA-VIP3-T-IC-2020-3 / Technical Supervision Individual Engineer (TSE) for subproject IDA / D0410 Village Investments Post Consultant Open 5,600.00 2,888.31 Signed 2020-02-21 2020-02-18 2020-04-10 2020-05-22 2020-05-01 2020-06-04 2020-06-05 2020-06-05 2020-12-02 ‘Overhaul of kindergarten in Selection Kaldyk village, Zhaiyl region, Chui oblast’ IDA-VIP3-T-IC-2020-4 / Technical Supervision Engineer (TSE) for subproject Individual Under “Construction of a IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-03-18 2020-03-16 2020-05-06 2020-05-27 2020-07-01 2020-12-28 Implementation kindergarten Ken-Aral village, Selection Bakai-Ata region, Talas oblast” IDA-VIP3-T-IC-2020-5 / Technical Supervision Engineer (TSE) for subproject Individual “Construction of a IDA / D0410 Village Investments Post Consultant Open 5,600.00 3,211.66 Signed 2020-03-18 2020-03-16 2020-05-06 2020-08-03 2020-05-27 2020-08-04 2020-07-01 2020-08-05 2020-12-28 kindergarten A.Ogonbaev Selection village, Talas region, Talas oblast” IDA-VIP3-T-IC-2020-6 / Technical Supervision Engineer (TSE) for subproject Individual “Construction of a IDA / D0410 Village Investments Post Consultant Open 5,600.00 4,002.26 Signed 2020-03-18 2020-03-16 2020-05-06 2020-08-03 2020-05-27 2020-08-04 2020-07-01 2020-08-05 2020-12-28 kindergarten for 50 places Selection Zherge-Tal village, Ak-Tala region, Naryn oblast” Page 3 IDA-VIP3-T-IC-2020-7 / Technical Supervision Engineer (TSE) for subproject Individual “Construction of a IDA / D0410 Village Investments Post Consultant Open 5,600.00 4,126.04 Signed 2020-03-18 2020-03-16 2020-05-06 2020-08-03 2020-05-27 2020-08-04 2020-07-01 2020-08-05 2020-12-28 kindergarten for 50 places Selection Zher-Kechkyu village, Naryn region, Naryn oblast” IDA-VIP3-T-IC-2020-8 / Technical Supervision Engineer (TSE) for subproject Individual “Construction of a IDA / D0410 Village Investments Post Consultant Open 7,100.00 4,628.29 Signed 2020-05-19 2020-05-18 2020-07-07 2020-08-03 2020-07-28 2020-08-04 2020-09-01 2020-08-05 2021-02-28 kindergarten for 100 places Selection Ak-Sai village, Ton region, Issyk-Kul oblast” IDA-VIP3-T-IC-2020-9 / Technical Supervision Engineer (TSE) for subproject Individual “Construction of an additional IDA / D0410 Village Investments Post Consultant Open 7,100.00 5,133.08 Signed 2020-05-19 2020-05-18 2020-07-07 2020-08-03 2020-07-28 2020-08-04 2020-09-01 2020-08-05 2021-02-28 building for "Zhetigen" Selection Kindergarten in Beryu-Bash village, Ak-Suu region, Issyk- Kul oblast” IDA-VIP3-T-IC-2020-10 / Technical Supervision Individual Engineer (TSE) for subproject IDA / D0410 Village Investments Post Consultant Open 5,600.00 3,201.81 Signed 2020-05-19 2020-05-18 2020-07-07 2020-08-03 2020-07-28 2020-08-04 2020-09-01 2020-08-05 2021-02-28 “Construction of FAP in Selection Tamchy-Bulak village, Kara- Buura region, Talas oblast” IDA-VIP3-T-IC-2020-11 / Technical Supervision Individual Engineer (TSE) for subproject IDA / D0410 Village Investments Post Consultant Open 5,600.00 3,460.08 Completed 2020-05-20 2020-05-18 2020-07-08 2020-08-03 2020-07-29 2020-08-04 2020-09-02 2020-08-05 2021-03-01 2020-12-31 “Construction of FAP in Chon- Selection Tash village, Tyup region, Issyk-Kul oblast” IDA-VIP3-T-IC-2020-12 / Technical Supervision Individual Engineer (TSE) for subproject IDA / D0410 Village Investments Post Consultant Open 5,600.00 4,126.04 Signed 2020-05-20 2020-05-18 2020-07-08 2020-08-03 2020-07-29 2020-08-04 2020-09-02 2020-08-05 2021-03-01 “Construction of Library in Selection Ottuk village, Naryn region, Naryn oblast” IDA-VIP3-T-IC-2020-13 / Technical Supervision Engineer (TSE) for subproject Individual “The device of a sewer IDA / D0410 Village Investments Post Consultant Open 5,600.00 2,617.09 Signed 2020-06-16 2020-05-20 2020-08-04 2020-10-19 2020-08-25 2020-10-19 2020-09-29 2020-10-20 2021-03-28 collector and connection to a Selection city network in Nijnealarcha village, Alamudun region, Chui oblast” VIP-S-CQ-20-2 / The geo- referencing to the area design documents (DDE), calculation of the estimated cost of works and materials, and conducting IDA / D0410 Village Investments Post Direct Selection Direct 5,000.00 0.00 Canceled 2020-05-22 2020-08-13 2020-05-29 2020-06-03 2020-08-02 supervision of the facility of Construction of a kindergarten for 50 children in the village of Maimak, Kara- Buura Raion IDA-VIP3-IC-20-13 / Development Cost Estimate Individual for the Capital Repair of the IDA / D0410 Village Investments Post Consultant Open 2,000.00 869.57 Signed 2020-07-13 2020-08-18 2020-08-17 2020-10-14 2020-08-20 2020-10-14 2020-08-26 2020-10-20 2020-11-24 building of School Selection Stravopolovka of Jaiyl Ragion, Chui Region IDA-VIP-S-DC-20-3 / The geo-referencing to the area of deteiled design documents (DDE), calculation of the estimated cost of works and IDA / D0410 Village Investments Post Direct Selection Direct 13,500.00 12,195.12 Completed 2020-07-20 2020-07-23 2020-07-27 2020-08-03 2020-08-01 2020-08-15 2020-09-30 2020-10-30 materials, and conducting supervision of the facility of Construction of a kindergarten for 100 children in the village of Taldy-Suu,IK IDA-VIP-S-DC-20-8 / author's supervision Construction of an additional building for "Zhetigen" IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,460.18 Signed 2020-07-24 2020-08-13 2020-08-03 2020-08-19 2020-08-07 2020-08-26 2021-03-05 Kindergarten in Beryu-Bash village, Ak-Suu region, Issyk- Kul oblast IDA-VIP-S-DC-20-9 / Author's supervision of Construction of FAP in IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 730.09 Signed 2020-07-24 2020-08-13 2020-08-03 2020-08-19 2020-08-06 2020-08-26 2021-01-03 Tamchy-Bulak village, Kara- Buura region, Talas oblast IDA-VIP-S-DC-20-10 / Author's supervision of construction of a kindergarten IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 878.40 Signed 2020-07-24 2020-08-13 2020-08-03 2020-08-19 2020-08-06 2020-08-26 2021-01-03 A.Ogonbaev village, Talas region, Talas oblast IDA-VIP-S-DC-20-11 / Author's supervision of construction of a kindergarten IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,169.07 Signed 2020-07-24 2020-08-13 2020-08-03 2020-08-19 2020-08-06 2020-08-26 2021-01-03 Ken-Aral village, Bakai-Ata region, Talas oblast IDA-VIP-S-DC-20-12 / Author's supervision of сonstruction of a kindergarten IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,226.87 Signed 2020-07-24 2020-08-13 2020-07-30 2020-08-19 2020-08-07 2020-08-26 2021-01-04 Zher-Kechkyu village, Naryn region, Naryn oblast Page 4 IDA-VIP-S-DC-20-13 / Author's supervision of Construction of a IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,746.01 Signed 2020-07-24 2020-08-13 2020-07-30 2020-08-19 2020-08-07 2020-08-26 2021-01-04 kindergarten Zherge-Tal village, Ak-Tala region, Naryn oblast IDA-VIP-S-DC-20-14 / Author's supervision of Construction of a IDA / D0410 Village Investments Post Direct Selection Direct 1,322.00 1,155.89 Signed 2020-07-24 2020-08-13 2020-07-30 2020-08-19 2020-08-07 2020-08-27 2021-03-05 kindergarten Ak-Sai village, Ton region, Issyk-Kul oblast IDA-VIP-S-DC-20-15 / Author's supervision of Construction of FAP in Chon- IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,469.34 Signed 2020-07-24 2020-08-13 2020-07-30 2020-08-19 2020-08-07 2020-08-27 2021-01-04 Tash village, Tyup region, Issyk-Kul oblast IDA-VIP-S-DC-20-16 / Author's supervision of Construction of Library in IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,130.53 Signed 2020-07-24 2020-08-13 2020-07-30 2020-08-19 2020-08-07 2020-08-27 2021-01-04 Ottuk village, Naryn region, Naryn oblast IDA-VIP-S-DC-20-1 / The geo-referencing to the area of deteiled design documents (DDE), calculation of the estimated cost of works and materials, and conducting IDA / D0410 Village Investments Post Direct Selection Direct 5,500.00 4,728.87 Completed 2020-08-03 2020-08-13 2020-08-09 2020-08-24 2020-08-12 2020-08-26 2020-11-10 2020-11-26 supervision of the facility of Construction of a kindergarten for 50 children in the village of Dobolu, Naryn Raio IDA-VIP-S-DC-20-2 / The geo-referencing to the area design documents (DDE), calculation of the estimated cost of works and materials, IDA / D0410 Village Investments Post Direct Selection Direct 5,500.00 4,728.87 Completed 2020-08-17 2020-08-24 2020-08-27 2020-08-24 2020-09-05 2020-08-26 2020-12-04 2020-11-26 and conducting supervision of the facility of Construction of a kindergarten for 50 children in the village of Maimak, Kara- Buura Raion IDA-VIP3-T-IC-2020-14 / Technical supervision consultant for sub projects of Capacity Building of Local Individual Under the construction of building IDA / D0410 Self-Governments and Post Consultant Open 6,000.00 0.00 2020-10-21 2020-10-22 2020-11-12 2020-11-13 2020-11-17 2021-07-15 Implementation for a group of family doctors Communities Selection (FGP) in the village Ak-Dobo Talas oblast(3 cycle) IDA-VIP-S-DC-20-17 / Author's supervision of the construction drainage collector and conection IDA / D0410 Village Investments Post Direct Selection Direct 2,500.00 2,563.50 Signed 2020-10-25 2020-11-13 2020-10-27 2020-10-26 2020-10-30 2021-01-06 2021-03-29 Bishkek City net in the Chui oblast, Alamudun rajion, Nijnee Ala-Archa IDA-VIP-S-DC-20-18 / The geo-referencing to the area of deteiled design documents (DDE), calculation of the estimated cost of works and IDA / D0410 Village Investments Post Direct Selection Direct 18,115.00 14,246.62 Signed 2020-11-04 2020-11-04 2020-11-09 2020-11-05 2020-11-13 2020-12-09 2021-02-26 materials, and conducting supervision of the facility of Construction of feldsher- obstetric station (FAP) in the villages. IDA-VIP3-T-IC-2020-15 / Technical supervision consultant for sub projects of Individual the construction of IDA / D0410 Village Investments Post Consultant Open 5,294.00 0.00 Canceled 2020-11-19 2020-11-20 2020-12-19 2020-12-22 2020-12-27 2021-09-23 Kindergarten for 100 places Selection in the village Taldu-Suu Issyk- Kul (3 cycle) IDA-VIP3-T-IC-2020-16 / Technical supervision consultant for sub project of Individual Under the сonstruction of IDA / D0410 Village Investments Post Consultant Open 5,294.00 0.00 2020-12-16 2021-02-04 2021-01-14 2021-01-15 2021-01-21 2021-10-18 Implementation kindergarten for 50 places in Selection the Dobolu village, Naryn Ragion, Naryn oblast (3 cycle) IDA-VIP3-T-IC-2020-17 / Technical supervision consultant for sub project of Individual the construction of IDA / D0410 Village Investments Post Consultant Open 5,294.00 0.00 Canceled 2020-12-16 2021-02-04 2021-01-01 2021-01-02 2021-01-21 2021-10-18 kindergarten for 50 places in Selection the Maymak village, Kara-Bura Ragion, Talas oblas (3 cycle) IDA-VIP3-IC-2020-18 / Selection of a consultant for the development of design estimates for: Individual "Repair of FAP, purchase of IDA / D0410 Village Investments Post Consultant Open 1,647.00 0.00 Canceled 2020-12-16 2020-12-14 2021-01-14 2021-01-15 2021-01-21 2021-02-20 inventory and equipment" in Selection the village. Zhar-Bashy, International AO, Issyk-Ata rayon, Chui oblast " IDA-VIP3-T-IC-2020-18 / Technical supervision Individual consultant for sub project of Under IDA / D0410 Village Investments Post Consultant Open 2,994.00 0.00 2021-01-06 2021-02-08 2021-02-08 2021-02-13 2021-09-11 the Repairing of school in the Implementation Selection village Stavropolovka, Zhayil rayon, Chui oblast (3 cycle) Page 5 Capacity Building of Local Individual IDA-VIP3-IC-2020-17 / IDA / D0410 Self-Governments and Post Consultant Open 5,835.00 0.00 Canceled 2020-11-19 2020-11-25 2020-12-20 2020-12-23 2020-12-25 2021-08-22 Infrastructure Engineer Communities Selection Individual IDA-VIP3-T-IC-2020-5/RT1 Pending IDA / D0410 Village Investments Post Consultant Open 5,835.00 0.00 2021-01-28 2021-03-18 2021-04-08 2021-05-13 2021-11-09 / Infrastructure Engineer Implementation Selection IDA-VIP3-T-IC-2021-1 / Technical supervision Individual consultant for sub project of Under IDA / D0410 Village Investments Post Consultant Open 2,948.00 0.00 2021-03-02 2021-03-04 2021-03-31 2021-04-01 2021-04-03 2021-09-30 the Repairing water sistem in Implementation Selection the Kadyraly village Ak-Tala raijion Naryn oblast IDA-VIP-S-DC-21-1 / Author's supervision of the construction kindergarten for Under IDA / D0410 Village Investments Post Direct Selection Direct 2,500.00 0.00 2021-03-03 2021-03-03 2021-03-18 2021-03-21 2021-10-17 50 places in the Maymak Implementation village Kara-Bura Rajion Talas oblast IDA-VIP-S-DC-21-2 / Author's supervision of the construction kindergarten for Under IDA / D0410 Village Investments Post Direct Selection Direct 2,500.00 0.00 2021-03-03 2021-03-10 2021-03-18 2021-03-21 2021-10-17 50 places in the Dobolu Implementation village Naryn Rajion Naryn oblast IDA-VIP-S-DC-21-3 / Author's supervision of the construction kindergarten for IDA / D0410 Village Investments Post Direct Selection Direct 2,500.00 1,325.99 Signed 2021-03-03 2021-03-05 2021-03-18 2021-03-12 2021-03-21 2021-03-15 2021-10-17 100 places in the Taldy-Suu village Tup Rajion Issyk-Kul oblast IDA-VIP-S-DC-21-4 / Author's supervision of Capital Repair Water System in IDA / D0410 Village Investments Post Direct Selection Direct 2,500.00 0.00 Canceled 2021-03-12 2021-03-18 2021-03-17 2021-03-20 2021-08-17 the village Kadyraly Naryn oblast (3 Cicle) Capacity Building of Local Individual IDA-VIP3-IC-2021-1 / IDA / D0410 Self-Governments and Post Consultant Open 3,300.00 0.00 Canceled 2021-03-12 2021-04-12 2021-04-15 2021-04-24 2021-08-22 Buisiness Planning Trainer Communities Selection IDA-VIP3-IC-TR-2021-2 / Capacity Building of Local Individual Business Planning and Under IDA / D0410 Self-Governments and Post Consultant Open 700.00 0.00 2021-03-29 2021-04-02 2021-04-29 2021-04-30 2021-05-02 2021-08-30 Financial Literacy Trainer in Implementation Communities Selection the Naryn oblast IDA-VIP3-IC-TR-2021-3 / Capacity Building of Local Individual Business Planning and Under IDA / D0410 Self-Governments and Post Consultant Open 700.00 0.00 2021-03-29 2021-04-02 2021-04-27 2021-04-28 2021-04-30 2021-08-28 Financial Literacy Trainer in Implementation Communities Selection the Talas oblast IDA-VIP3-IC-TR-2021-4 / Capacity Building of Local Individual Business Planning and Under IDA / D0410 Self-Governments and Post Consultant Open 700.00 0.00 2021-03-29 2021-04-02 2021-04-27 2021-04-28 2021-04-30 2021-08-28 Financial Literacy Trainer in Implementation Communities Selection the Issyk-Kul oblast IDA-VIP3-IC-TR-2021-5 / Capacity Building of Local Individual Business Planning and Under IDA / D0410 Self-Governments and Post Consultant Open 700.00 0.00 2021-03-29 2021-04-02 2021-04-27 2021-04-28 2021-04-30 2021-08-28 Financial Literacy Trainer in Implementation Communities Selection the Chui oblst (1) IDA-VIP3-IC-TR-2021-6 / Capacity Building of Local Individual Business Planning and Under IDA / D0410 Self-Governments and Post Consultant Open 700.00 0.00 2021-03-29 2021-04-02 2021-04-27 2021-04-28 2021-04-30 2021-08-28 Financial Literacy Trainer in Implementation Communities Selection the Chui oblst (2) IDA-VIP3-IC-2021-2 / Senior Capacity Building of Local Individual Under Economist (Local Markets and IDA / D0410 Self-Governments and Post Consultant Open 4,400.00 0.00 2021-03-31 2021-03-30 2021-04-30 2021-05-02 2021-05-07 2021-11-03 Implementation Buisiness Expert) Communities Selection IDA-VIP3-IC-2021-3 / Consultant for the Capacity Building of Local Under development of Project IDA / D0410 Self-Governments and Post Direct Selection Direct 4,000.00 0.00 2021-03-31 2021-04-15 2021-04-03 2021-04-12 2021-07-11 Implementation Operational Manual for VIP-3 Communities AF IDA-VIP3-IC-SSS-TR-2021-7 Capacity Building of Local / Trainer for basic trainings of Under IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Operational Manual of Project Implementation Communities in the Naryn oblast (1) IDA-VIP3-IC-SSS-TR-2021-8 Capacity Building of Local / Trainer for basic trainings of Under IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Operational Manual of Project Implementation Communities in the Chui oblast (1) IDA-VIP3-IC-SSS-TR-2021-9 Capacity Building of Local / Trainer for basic trainings of Under IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Operational Manual of Project Implementation Communities in the Chui oblast (2) IDA-VIP3-IC-SSS-TR-2021- 10 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (3) IDA-VIP3-IC-SSS-TR-2021- 11 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Issyk- Communities Kul oblast (1) Page 6 IDA-VIP3-IC-SSS-TR-2021- 12 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Naryn Communities oblast (2) IDA-VIP3-IC-SSS-TR-2021- 13 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (4) IDA-VIP3-IC-SSS-TR-2021- 14 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Issyk- Communities Kul oblast (2) IDA-VIP3-IC-SSS-TR-2021- 15 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (5) IDA-VIP3-IC-SSS-TR-2021- 17 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-29 2021-07-28 Implementation Manual of Project in the Chui Communities oblast (7) IDA-VIP3-IC-SSS-TR-2021- 18 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (8) IDA-VIP3-IC-SSS-TR-2021- 19 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Talas Communities oblast (1) IDA-VIP3-IC-SSS-TR-2021- 20 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-05-19 2021-08-17 Implementation Manual of Project in the Chui Communities oblast (9) IDA-VIP3-IC-SSS-TR-2021- 21 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (10) IDA-VIP3-IC-SSS-TR-2021- 22 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Issyk- Communities Kul oblast (3) IDA-VIP3-IC-SSS-TR-2021- 23 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Talas Communities oblast (2) IDA-VIP3-IC-SSS-TR-2021- 24 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Naryn Communities oblast (3) IDA-VIP3-IC-SSS-TR-2021- 25 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (11) IDA-VIP3-IC-SSS-TR-2021- 26 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Issyk- Communities Kul oblast (4) IDA-VIP3-IC-SSS-TR-2021- 27 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Naryn Communities oblast (4) IDA-VIP3-IC-SSS-TR-2021- 28 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Naryn Communities oblast (4) IDA-VIP3-IC-SSS-TR-2021- 29 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Talas Communities oblast (3) IDA-VIP3-IC-SSS-TR-2021- 30 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Naryn Communities oblast (5) IDA-VIP3-IC-SSS-TR-2021- 31 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (13) Page 7 IDA-VIP3-IC-SSS-TR-2021- 32 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (14) IDA-VIP3-IC-SSS-TR-2021- 33 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Talas Communities oblast (4) IDA-VIP3-IC-SSS-TR-2021- 34 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Issyk- Communities Kul oblast (6) IDA-VIP3-IC-SSS-TR-2021- 35 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-29 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (14) IDA-VIP3-IC-SSS-TR-2021- 36 / Trainer for basic Capacity Building of Local Under trainings of Operational IDA / D0410 Self-Governments and Post Direct Selection Direct 1,588.00 0.00 2021-04-19 2021-04-30 2021-04-24 2021-04-30 2021-07-29 Implementation Manual of Project in the Chui Communities oblast (15) IDA-VIP3-T-IC-2021-2 / Technical supervision Individual consultant for sub project of Pending IDA / D0410 Village Investments Post Consultant Open 3,800.00 0.00 2021-05-03 2021-06-03 2021-06-06 2021-06-10 2022-01-06 the Major repair kindergarten Implementation Selection Alenka in the Predtechenka village Chui oblast (3 cycle) IDA-VIP3-T-IC-2021-3 / Technical supervision Individual consultant for sub project of Pending IDA / D0410 Village Investments Post Consultant Open 4,800.00 0.00 2021-05-03 2021-06-07 2021-06-08 2021-06-10 2022-03-07 the Repairing water sistem in Implementation Selection the Jyrgalan village Tup raijion Issyk-Kul oblast (3 cycle) IDA-VIP3-T-IC-2021-4 / Technical supervision Individual consultant for sub project of Pending IDA / D0410 Village Investments Post Consultant Open 3,200.00 0.00 2021-05-04 2021-06-04 2021-06-07 2021-06-09 2021-12-06 the сonstruction of FAP`in the Implementation Selection village Min-Bulak Bakai-Ata raijion Talas oblast (3 cycle) IDA-VIP3-T-IC-2021-5 / Technical supervision Individual consultant for sub project of Pending IDA / D0410 Village Investments Post Consultant Open 3,200.00 0.00 2021-05-03 2021-06-05 2021-06-06 2021-06-08 2021-12-05 the сonstruction of FAP`in the Implementation Selection village Min-Bulak Typ rajion Issyk-Kul oblast (3 cycle) IDA-VIP3-T-IC-2021-6 / Technical supervision consultant for sub project Individual Installation of lighting on the Pending IDA / 56010 Village Investments Post Consultant Open 2,948.00 0.00 2021-05-17 2021-06-17 2021-06-20 2021-06-24 2021-12-21 streets in villages Zher-Kazar, Implementation Selection Nizhniy-Nooruz, Druzhba Villages, Issyk-Ata Raion, Chuy Oblast IDA-VIP3-T-IC-2021-7 / Technical supervision Individual consultant for sub project of Pending IDA / 56010 Village Investments Post Consultant Open 2,948.00 0.00 2021-05-17 2021-06-17 2021-06-20 2021-06-24 2021-12-21 the Construction of FAP in the Implementation Selection village Min-Bulak Bakai-Ata raijion Talas oblast IDA-VIP3-IC-2020-19 / Naryn Regional Specialist for Capacity Building of Local Individual Pending Social Mobilization, Capacity IDA / D0410 Self-Governments and Post Consultant Open 6,000.00 0.00 2021-06-01 2021-06-30 2021-07-01 2021-07-03 2021-12-31 Implementation Building and Gender Communities Selection Development IDA-VIP-S-DC-21-5 / Author's supervision of the Installation of lighting on the Under streets in villages Zher-Kazar, IDA / D0410 Village Investments Post Direct Selection Direct 2,500.00 0.00 2021-06-01 2021-06-08 2021-06-16 2021-06-19 2021-12-16 Implementation Nizhniy-Nooruz, Druzhba Villages, Issyk-Ata Raion, Chuy Oblast (3 Cicle) IDA-VIP-S-DC-21-6 / Author's supervision of the Major Repair drinking water Under IDA / D0410 Village Investments Post Direct Selection Direct 10,700.00 0.00 2021-06-03 2021-06-08 2021-06-18 2021-06-21 2022-03-18 system in the village Jyrgalan Implementation Ak-Suu raijon Issyk-Kul oblast (3 Cicle) IDA-VIP3-IC-2021-4 / Сonsultant for the development of detailed design estimates for Individual installation of sanitary Under IDA / D0410 Village Investments Post Consultant Open 1,176.00 0.00 2021-06-15 2021-06-15 2021-07-13 2021-07-13 2021-07-18 2021-08-17 facilities in a secondary school Implementation Selection in the villages of Santash 3- ferma, Sary-Tologoi, Ken-Suu, Baizak, Santash AO, Tyup rayon, Issyk-Kul oblast IDA-VIP3-IC-2021-6 / Сonsultant for the development of detailed design estimates for the Individual Under renovation of a FAP and IDA / D0410 Village Investments Post Consultant Open 1,176.00 0.00 2021-06-16 2021-06-15 2021-07-14 2021-07-14 2021-07-19 2021-08-18 Implementation purchase of inventory in the Selection village of Ozgorush, Ozgurush AO, Bakai-Ata rayon, Talas oblast Page 8 IDA-VIP3-IC-2021-7 / Сonsultant for the development of detailed design estimates for the Individual Under repair of sanitary facilities in IDA / D0410 Village Investments Post Consultant Open 1,176.00 0.00 2021-06-16 2021-06-15 2021-07-14 2021-07-14 2021-07-19 2021-08-18 Implementation the secondary school in the Selection village of Kyz-Molo, Tselinniy AO, Moskovskiy rayon, Chuy oblast IDA-VIP3-IC-2021-5 / Consultant for the development of DED for the renovation of a FAP, the purchase of furniture, office Individual Pending equipment, and the IDA / D0410 Village Investments Post Consultant Open 1,176.00 0.00 2021-06-16 2021-07-14 2021-07-14 2021-07-19 2021-08-18 Implementation installation of a water supply Selection system with sanitary facilities in a kindergarten in the village of Konorchok, Ak-Taala rayon, Naryn obl Page 9 PROCUREMENT PLAN (Textual Part) Turkey Safe Schooling and Distance Education Project information: Project (P173997) Project Implementation Ministry of National Education of Turkey Agency: Date of the Procurement 3 June 2020 Plan: Period covered by this 3 June 2020 – 31 December 2023 Procurement Plan: Date of General 24 June 2020 Procurement Notice: I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. Any procurement activity under the Project shall not be initiated before it is approved by the Bank through STEP. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Goods, Works and Non-Consulting Services Procurement Method/Market Procurement Method Threshold Approach RFB/Open Default Method (No procurement method threshold) International Goods and Non-consulting Services RFB/Open National Contracts less than US$5,000,000 Goods, Non-Consulting Services RFQ Contracts less than US$2,000,000 No threshold (subject to justification in the Project Direct Selection Procurement Strategy for Development (PPSD)) III. Selection of Consultants Selection Method Selection Method Threshold Quality and Cost Based No selection method threshold Selection (QCBS) Least Cost Selection No selection method threshold (LCS) Quality Based Selection No selection method threshold (QBS) 1|2 Selection Based on Consultants Contracts valued less than $3,000,000 Qualification (CQS) Individual Consultants No selection method threshold (IC) No selection method threshold (subject to justification in Direct Selection PPSD) The terms of references of any audit, procurement or legal consultants financed by the project shall be sent to the Bank for its comments. IV. Special Arrangements 1. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. For the procurements not subject to international competitive selection the procurement documents agreed by the Bank shall be used. When approaching the national market, bidding documents accepted by the World Bank will be used. 2. Review Procedure: The World Bank will carry out prior review of the only critical contracts as specified in the procurement plan. Other procurements under the project are subject to the Bank’s ex-post review unless otherwise specified in the procurement schedule given below in Section V. 3. Retroactive financing: Retroactive Financing will be considered under the project as specified in Section V, subject to the conditions defined in paragraphs 5.1 and 5.2 of the Procurement Regulations for Borrowers. 4. Procurement of Second-Hand Goods: Procurement of second-hand goods may be considered under the project, where justified and needed to respond to emergency. 5. Domestic preference (as specified under paragraph 5.51 of the Procurement Regulations): Applicable when open international competitive procurement is used to procure goods and the Bank’s Standard Procurement Document used for the subject procurement has standard provisions to use margin of domestic preference. 6. Procurement method and market approach for Contract No CS-C2.2-02a, b, c..... “Consultancy Services for EdTech Innovation Hub Research & Development Activities of digital contents and EdTech solutions” below in Section V, shall be further detailed in the PPSD during the project implementation stage and will be implemented upon approval of the World Bank. 7. Operational costs. will not be considered under procurement implementation which could be the incremental expenses, including office supplies, vehicles operation and maintenance cost, maintenance of equipment, communication costs (including network payments to Turk Telecom and payments made by TRT to TURKSAT), rental expenses, utilities expenses, consumables, transport and 2|2 accommodation, per diem, honorarium paid to the individuals invited to training activities and Working Groups, cost for procurement advertisements, and salaries of locally contracted support staff. 3|2 PROCUREMENT Turkey : Safe Schooling and Distance Education Project PLAN General Information Country: Turkey Bank’s Approval Date of the Original Procurement Plan: 2020-07-17 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173997 GPN Date: 2020-06-24 Project Name: Safe Schooling and Distance Education Project Loan / Credit No: IBRD / 91520 M Executing Agency(ies): inistry of National Education - DG for Innovation and Educational Technologies (DGIET) WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Institutional Capacity for CW-C3.1-01 / PIU Office Request for Single Stage - One 2022-10- IBRD / 91520 Education Technology Post Limited 730,288.34 Signed 2021-04-01 2021-03-10 2021-05-04 2021-04-12 Refurbishment Works Quotations Envelope 26 Resilience Request for Quotations - Pending CW-C2.1-01 / EBA Studios Digital Content and Pedagogy Request for Single Stage - One Small Works 2021-10- IBRD / 91520 Post Limited 0.00 Implementat 2021-07-01 2021-08-03 Refurbishment Works for Safety and Quality Quotations Envelope (Emergency) 02 ion SPD - Competitive GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Institutional Capacity for GO-C3.1-02 / Procurement Request for Single Stage - One IBRD / 91520 Education Technology Post Limited 11,323.37 Signed 2020-07-31 2020-12-17 2020-08-15 2020-12-28 2020-08-30 of an Accounting Software Quotations Envelope Resilience GO-C1.1-01A / Procurement of Servers, Network Devices Emergency Connectivity and for Data Centers, SAN Switch IBRD / 91520 IT Infrastructure for Post Direct Selection Direct 244,819.83 Signed 2020-06-04 2020-07-14 2020-06-09 2020-06-09 2020-07-17 2020-07-17 2023-07-24 License Upgrades and VMware Education in Emergencies Licenses (in Separate Lots) GO-C1.1-01B / Procurement of Servers, Network Devices Emergency Connectivity and Request for Single Stage - One for Data Centers, SAN Switch IBRD / 91520 IT Infrastructure for Post Limited 1,053,587.69 Signed 2020-07-25 2020-09-03 2020-08-30 2020-10-09 2023-10-15 Quotations Envelope License Upgrades and VMware Education in Emergencies Licenses GO-C1.1-01C / Procurement Emergency Connectivity and of Oracle License & Advanced IBRD / 91520 IT Infrastructure for Post Direct Selection Direct 0.00 Canceled 2020-08-26 2020-08-31 2020-09-15 2021-09-15 Customer Service (ACS) Education in Emergencies GO-C1.1-01D / Procurement Emergency Connectivity and of F5 Viprion 4450 load IBRD / 91520 IT Infrastructure for Post Direct Selection Direct 0.00 Canceled 2020-08-26 2020-08-31 2020-09-15 2021-09-15 balancer blades Education in Emergencies GO-C1.1-01 D / Emergency Connectivity and Request for Single Stage - One Procurement of F5 Viprion IBRD / 91520 IT Infrastructure for Post Limited 340,000.00 Signed 2020-10-21 2020-10-22 2020-11-19 2020-11-25 2024-01-08 Quotations Envelope 4450 load balancer blades Education in Emergencies GO-C1.1-01 C / Procurement Emergency Connectivity and Request for Single Stage - One of Oracle License & Advanced IBRD / 91520 IT Infrastructure for Post Limited 103,907.23 Signed 2020-10-22 2020-10-22 2020-11-16 2020-11-10 2021-11-16 Quotations Envelope Customer Service (ACS) Education in Emergencies Emergency Connectivity and GO-C1.1-02 / Procurement Request for Single Stage - One IBRD / 91520 IT Infrastructure for Post Limited 857,000.00 Signed 2020-12-05 2020-12-17 2021-01-10 2021-01-08 2023-12-31 of Data Storage Unit Quotations Envelope Education in Emergencies GO-C3.1-01 / Procurement Institutional Capacity for Pending Request for Single Stage - One of Office Furniture & Hardware IBRD / 91520 Education Technology Post Limited 0.00 Implementati 2021-06-06 2021-07-30 2021-08-29 Quotations Envelope for PIU (In Separate Lots) Resilience on GO-C2.1-03 / Goods (i.e. video cameras, mics, other Pending audio-visual production Digital Content and Pedagogy Request for Single Stage - One IBRD / 91520 Post Open - National 0.00 Implementati 2021-10-16 2021-12-01 2024-01-16 equipment & software) for In- for Safety and Quality Quotations Envelope on House Content Development (In separate lots) GO-C2.1-03 A / Procurement Digital Content and Pedagogy Request for Single Stage - One of Computers and Peripheral IBRD / 91520 Post Limited 0.00 Canceled 2021-03-27 2021-03-22 2021-05-22 2023-07-21 for Safety and Quality Quotations Envelope Units GO-C2.1-03A / Procurement of computers and computer Digital Content and Pedagogy Request for Single Stage - One IBRD / 91520 Post Limited 0.00 Canceled 2021-02-06 2021-02-10 2021-04-03 2023-06-02 peripherals for in-house for Safety and Quality Quotations Envelope content development Emergency Connectivity and GO-C1.1-03 / Procurement Request for Single Stage - One IBRD / 91520 IT Infrastructure for Post Limited 81,181.43 Signed 2021-04-20 2021-04-14 2021-05-15 2021-05-27 2023-05-15 of Firewall Quotations Envelope Education in Emergencies GO-C2.1-03 A / Digital Content and Pedagogy Request for Single Stage - One Procurement of Computers IBRD / 91520 Post Limited 98,062.73 Signed 2021-05-05 2021-04-30 2021-06-30 2021-06-16 2023-06-30 for Safety and Quality Quotations Envelope and Peripheral Units GO-C2.1-03B / Procurement of Equipment for In-House Pending Content Development (video Digital Content and Pedagogy Request for Single Stage - One IBRD / 91520 Post Limited 0.00 Implementati 2021-07-05 2021-07-28 2021-09-26 cameras, mics, other audio- for Safety and Quality Quotations Envelope on visual production equipment, etc.) Emergency Connectivity and Pending GO-C1.1-04 / Procurement Request for Single Stage - One IBRD / 91520 IT Infrastructure for Post Open - National 0.00 Implementati 2021-07-05 2021-08-31 2021-10-30 of Storage Unit Quotations Envelope Education in Emergencies on Page 1 GO-C1.2-01 / System Design/ Software Interoperability /Data Integration and Emergency Connectivity and Pending Single Stage - One Implementation, including IBRD / 91520 IT Infrastructure for Prior Request for Bids Open - International 0.00 Implementati 2021-10-10 2021-11-10 2021-12-10 2022-01-09 2022-02-07 2023-08-10 Envelope integration of Inclusive, Education in Emergencies on Accessible and Equitable Digital Contents and EdTech solutions NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NCS-C2.1-01A / Production of Digital Content for School Closure and for Students with Digital Content and Pedagogy Request for Single Stage - One IBRD / 91520 Post Limited 226,467.37 Signed 2020-11-06 2020-11-17 2020-11-20 2020-12-22 2021-03-20 Special Needs, including for Safety and Quality Quotations Envelope translation, audio description, shooting and production NCS-C1.1-02 / Procurement Emergency Connectivity and of Content Delivery Network IBRD / 91520 IT Infrastructure for Post Direct Selection Direct 175,845.25 Signed 2020-12-04 2020-12-03 2020-12-16 2021-01-15 2021-01-20 2021-02-15 2022-01-01 Service Education in Emergencies NCS-C1.1-01 / Extension of Emergency Connectivity and existing Virtual Classroom IBRD / 91520 IT Infrastructure for Post Direct Selection Direct 937,500.00 Signed 2020-03-01 2020-03-18 2020-03-08 2020-03-18 2020-03-17 2020-03-17 2021-07-10 Service Contract from Zoom Education in Emergencies NCS-C2.1-02A / Production of School Reopening Outreach Digital Content and Pedagogy Request for Single Stage - One IBRD / 91520 Post Limited 43,295.23 Signed 2021-03-01 2021-02-25 2021-03-18 2021-03-15 2021-05-17 Digital Content - Public for Safety and Quality Quotations Envelope Service Announcement Videos NCS-C2.1-02B / Production Pending Digital Content and Pedagogy Request for Single Stage - One of School Reopening Outreach IBRD / 91520 Post Limited 0.00 Implementati 2021-07-16 2021-07-23 2021-08-18 for Safety and Quality Quotations Envelope Digital Content (Posters) on NCS-C1.2-02 / Procurement Emergency Connectivity and Pending Single Stage - One of Content Delivery Network IBRD / 91520 IT Infrastructure for Prior Request for Bids Open - International 0.00 Implementati 2021-05-15 2021-06-12 2021-07-12 2021-08-01 2021-09-07 2023-09-22 Envelope Service Education in Emergencies on Emergency Connectivity and Pending NCS-C1.2-04 / Procurement Single Stage - One IBRD / 91520 IT Infrastructure for Post Request for Bids Open - International 0.00 Implementati 2021-04-15 2021-04-15 2021-04-30 2021-05-20 2021-06-24 2023-01-09 of Test Services Envelope Education in Emergencies on NCS-C2.1-01B / Digital Content Audio Description and Digital Content Production for Visually- Impaired Students (Production Digital Content and Pedagogy Request for Single Stage - One IBRD / 91520 Post Limited 116,842.73 Signed 2021-04-01 2021-03-22 2021-04-15 2021-04-08 2021-08-13 of Digital Content for School for Safety and Quality Quotations Envelope Closure and for Students with Special Needs, including translation, audio description, shooting and production) Emergency Connectivity and NCS-C1.2-04A / Request for Single Stage - One IBRD / 91520 IT Infrastructure for Post Limited 0.00 Canceled 2021-01-20 2021-02-12 2021-03-17 2021-09-13 Procurement of Test Services Quotations Envelope Education in Emergencies NCS-C1.2-03 / Procurement Emergency Connectivity and Pending Single Stage - One of Virtual Classroom Service IBRD / 91520 IT Infrastructure for Prior Request for Bids Open - International 0.00 Implementati 2021-07-15 2021-07-20 2021-08-24 2021-09-10 2021-10-15 2023-12-30 Envelope (100K Virtual Classrooms) Education in Emergencies on NCS-C1.2-04 A / Emergency Connectivity and Pending Request for Single Stage - One Procurement of Test Services IBRD / 91520 IT Infrastructure for Post Limited 0.00 Implementati 2021-04-05 2021-05-31 2021-06-30 Quotations Envelope - Load Test Education in Emergencies on NCS-C2.1-01C / Production of Videos for Answers to Questions in English for Preparation for Foreign Pending Language Exam (Production of Digital Content and Pedagogy Request for Single Stage - One IBRD / 91520 Post Limited 0.00 Implementati 2021-05-01 2021-05-22 2021-07-06 Digital Content for School for Safety and Quality Quotations Envelope on Closure and for Students with Special Needs, including translation, audio description, shooting and production) NCS-C2.1-01D / Introductory 3D Animation Video Fims for Pending Digital Content and Pedagogy Request for Single Stage - One Vocational and Technical IBRD / 91520 Post Limited 0.00 Implementati 2021-06-01 2021-06-22 2021-09-25 for Safety and Quality Quotations Envelope Training (47 videos of 120'' on each) NCS-C1.2-01 / Procurement Emergency Connectivity and Pending Single Stage - One of Data Center Service or IBRD / 91520 IT Infrastructure for Prior Request for Bids Open - International 0.00 Implementati 2021-10-20 2021-11-17 2021-12-17 2022-01-07 2022-01-25 2023-12-21 Envelope Cloud Platform Service Education in Emergencies on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-C3.2-01 / Consultancy Institutional Capacity for Consultant Services for Generating Pending IBRD / 91520 Education Technology Post Qualification Open - National 0.00 2022-08-31 2022-09-15 2022-09-29 2022-10-06 2022-11-15 2023-06-29 Lessons Learned and e- Implementation Resilience Selection learning Resilience CS-C3.2-02 / Consultancy Institutional Capacity for Consultant Services for Disaster Risk Pending IBRD / 91520 Education Technology Post Qualification Open - National 0.00 2022-08-31 2022-09-15 2022-09-29 2022-10-06 2022-11-15 2023-05-14 Management and Education in Implementation Resilience Selection Emergencies Page 2 CS-C3.1-16 / Consulting Institutional Capacity for Consultant Pending Services for an Impact IBRD / 91520 Education Technology Post Qualification Open - National 0.00 2022-06-15 2022-07-06 2022-08-19 2022-09-18 2022-10-23 2023-06-30 Implementation Evaluation Study Resilience Selection CS-C2.2-01 / Consultancy Services for Needs Consultant Assessment and Design of Digital Content and Pedagogy Pending IBRD / 91520 Post Qualification Open - National 0.00 2021-09-01 2021-09-14 2021-10-05 2021-10-12 2021-11-14 2022-12-31 Digital Content & Education for Safety and Quality Implementation Selection Technology Development Ecosystem CS-C1.2-01 / Consultancy Services for Feasibility Study/ Emergency Connectivity and Consultant Under Needs Analysis, Technical IBRD / 91520 IT Infrastructure for Prior Qualification Open - International 0.00 2021-03-26 2021-04-01 2021-04-19 2021-04-20 2021-05-19 2021-06-18 2021-06-03 2021-06-22 2024-01-10 Implementation Design and Implementation Education in Emergencies Selection Support INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Institutional Capacity for Individual CS-C3.1-01 / Selection of a IBRD / 91520 Education Technology Post Consultant Limited 56,511.50 Signed 2020-07-10 2020-10-23 2020-07-13 2020-10-21 2020-07-16 2020-11-04 2020-07-20 2020-11-05 2023-06-30 Procurement Specialist Resilience Selection CS-C3.1-02 / Selection of a Institutional Capacity for Individual Financial Management IBRD / 91520 Education Technology Post Consultant Open 37,935.05 Signed 2020-07-16 2020-07-17 2020-08-14 2020-09-24 2020-08-19 2020-10-01 2020-08-29 2020-10-14 2023-06-30 Specialist Resilience Selection Institutional Capacity for Individual CS-C3.1-11 / Selection of a IBRD / 91520 Education Technology Post Consultant Open 22,115.40 Signed 2020-06-12 2020-11-19 2020-08-11 2020-12-01 2020-08-16 2020-12-01 2020-09-15 2020-12-16 2023-06-30 Communication Specialist Resilience Selection Institutional Capacity for Individual CS-C3.1-12 / Selection of a IBRD / 91520 Education Technology Post Consultant Open 48,622.43 Signed 2020-06-12 2020-08-31 2020-08-11 2020-11-03 2020-08-15 2020-11-03 2020-09-15 2020-11-05 2023-06-30 Social Safeguards Specialist Resilience Selection CS-C3.1-13 / Selection of an Institutional Capacity for Individual Environmental Safeguards IBRD / 91520 Education Technology Post Consultant Open 56,219.00 Signed 2020-06-12 2020-08-31 2020-08-15 2021-03-03 2020-08-20 2020-11-03 2020-09-15 2020-11-15 2023-06-30 Specialist Resilience Selection CS-C3.1-05B / Content Institutional Capacity for Individual Development Specialist IBRD / 91520 Education Technology Post Consultant Open 34,797.02 Signed 2020-10-27 2020-11-17 2020-11-24 2021-02-09 2020-11-27 2021-02-09 2020-12-03 2021-02-11 2023-06-30 (Supply – Production Planning Resilience Selection and Delivery) CS-C3.1-05C / Content Institutional Capacity for Individual Development Specialist - IBRD / 91520 Education Technology Post Consultant Open 36,536.87 Signed 2020-10-27 2020-11-17 2020-11-24 2021-02-09 2020-11-27 2021-02-09 2020-12-03 2021-03-17 2023-06-30 Education and Curricular Resilience Selection Strategy CS-C3.1-10B / Short-Term, Report-Based Individual Consulting Services for Review and Revision of the Terms of Reference of Consultancy Institutional Capacity for Individual Services for Feasibility Study/ IBRD / 91520 Education Technology Post Consultant Limited 8,750.00 Signed 2021-03-01 2021-03-01 2021-03-06 2021-02-25 2021-03-11 2021-03-01 2021-03-13 2021-03-02 2021-05-27 Needs Analysis &Technical Resilience Selection Designs and for Review of the Consultants’ Technical Proposal CS-C3.1-10A / Selection of Probity Assurance Provider in Institutional Capacity for Individual CQS Negotiation process for IBRD / 91520 Education Technology Prior Consultant Limited 10,446.14 Signed 2021-03-24 2021-04-21 2021-03-29 2021-04-30 2021-04-03 2021-05-05 2021-04-05 2021-05-07 2021-06-19 Feasaibility and Needs Resilience Selection Assessment Contract CS-C3.1-05A / Digital Institutional Capacity for Individual Content Developer - Team IBRD / 91520 Education Technology Post Consultant Open 0.00 Canceled 2020-10-27 2020-10-20 2020-11-24 2021-01-14 2020-11-27 2021-01-14 2020-12-03 2023-06-30 Leader Resilience Selection Institutional Capacity for Individual CS-C3.1- 04 / Selection of Pending IBRD / 91520 Education Technology Post Consultant Open 0.00 2021-03-29 2021-04-24 2021-04-26 2021-04-28 2023-12-13 An E Learning Specialist Implementation Resilience Selection Institutional Capacity for Individual CS-C3.1-04 / E-Learning IBRD / 91520 Education Technology Post Consultant Open 0.00 Canceled 2020-10-14 2020-11-09 2020-11-09 2020-12-27 2020-11-11 2021-02-10 2020-11-13 2023-06-30 Expert Resilience Selection CS-C3.1-03 / Selection of a Institutional Capacity for Individual Pending Monitoring & Evaluation IBRD / 91520 Education Technology Post Consultant Open 0.00 2021-04-30 2021-06-04 2021-06-09 2021-06-19 2023-12-31 Implementation Specialist Resilience Selection Page 3 Sample Procurement Plan I. General 2. Bank’s approval Date of the procurement Plan Original: December 2014: Revision 7 of Updated Procurement Plan, February 8, 2018 3. Date of General Procurement Notice: Dec 24, 2014 4. Period covered by this procurement plan: The procurement period of project covered from February 2018 till Project completion II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Grant TF 019124 dated May 2014 issued by PMU-GPE 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Packages Review July 9, 2010 Ref. Descripti Estimat Dome by Bank Comme No. on ed stic (Prior / nts Cost Prefe Post) US$ rence million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Pakistan : Global Partnership for Education - Balochistan Education Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2018-02-07 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144454 GPN Date: Project Name: Global Partnership for Education - Balochistan Education Project Loan / Credit No: TF / 19124, TF / B0772 Project Management Unit Global Partnership for Education Balochistan Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-PMU-GPEB-61237-CW- DIR / PACKAGE- (63) DISTRICT DERA BUGTI, ONE ROOM NEW PRIMARY SCHOOL Component I: Access and 2018-12- TF / 19124 Post Direct Selection Direct 192,424.00 162,328.87 Completed 2018-04-30 2018-04-30 2018-05-02 2018-05-03 2018-05-09 2018-07-06 NO (10), UP GRADATION OF Equity 31 GGMS REHMAT COLONY (01), UP GRADATION OF GGPS WAPDA COLONY (01) PK-PMU-GPEB-147774-CW- RFB / Package No 16 Component II: Quality and Single Stage - One 2021-05- Construction and TF / B0772 Post Request for Bids Open - National 271,232.00 159,769.58 Signed 2020-03-30 2020-04-03 2020-04-04 2020-04-03 2020-04-26 2020-04-20 2020-05-11 2020-05-06 2020-05-31 2020-06-16 Increased Accountability Envelope 31 Rehabilitation of Schools at District Panjgor & Washuk AF - PK-PMU-GPEB-110314- CW-RFB / Package No 12 Construction and Component II: Quality and Single Stage - One 2021-05- TF / B0772 Post Request for Bids Open - National 406,848.00 322,652.61 Signed 2020-03-12 2020-04-03 2020-03-17 2020-04-03 2020-04-01 2020-04-20 2020-04-16 2020-05-06 2020-05-06 2020-06-16 Rehabilitation of Schools at Increased Accountability Envelope 06 District Kalat, Sikandarabad (Surab) and Khuzdar PK-PMU-GPEB-147773-CW- RFB / Package No 15 Component II: Quality and Single Stage - One 2021-05- Construction and TF / B0772 Post Request for Bids Open - National 135,616.00 104,101.67 Signed 2020-03-30 2020-04-03 2020-04-04 2020-04-03 2020-04-19 2020-04-20 2020-05-04 2020-05-06 2020-05-24 2020-06-16 Increased Accountability Envelope 24 Rehabilitation of Schools at District Kech AF - PK-PMU-GPEB-110318- CW-RFB / Package No 14 Component II: Quality and Single Stage - One 2021-05- Construction and TF / B0772 Post Request for Bids Open - National 271,232.00 136,639.99 Signed 2020-03-30 2020-04-03 2020-04-04 2020-04-03 2020-04-19 2020-04-20 2020-05-04 2020-05-06 2020-05-24 2020-06-16 Increased Accountability Envelope 24 Rehabilitation of Schools at District Zhob and Sherani AF - PK-PMU-GPEB-110308- CW-RFB / Package No 7, Component II: Quality and Single Stage - One 2021-05- Construction and TF / B0772 Post Request for Bids Open - National 135,616.00 101,773.95 Signed 2020-03-12 2020-04-03 2020-03-17 2020-04-03 2020-04-01 2020-04-18 2020-04-16 2020-05-06 2020-05-06 2020-06-16 Increased Accountability Envelope 06 Rehabilitation of Schools at District Gwadar PK-PMU-GPEB-117839-CW- RFB / Package No 6 Component II: Quality and Single Stage - One 2021-04- Construction and TF / B0772 Post Request for Bids Open - National 135,616.00 57,578.68 Signed 2020-03-02 2020-04-02 2020-03-07 2020-04-03 2020-03-22 2020-04-18 2020-04-06 2020-05-06 2020-04-26 2020-06-16 Increased Accountability Envelope 26 Rehabilitation of Schools at District Musakhail AF - PK-PMU-GPEB-110312- CW-RFB / Package No 10 Construction and Component II: Quality and Single Stage - One 2021-04- TF / B0772 Post Request for Bids Open - National 406,848.00 254,653.45 Signed 2020-03-12 2020-04-02 2020-03-17 2020-04-03 2020-03-18 2020-04-20 2020-04-02 2020-05-06 2020-04-22 2020-06-16 Rehabilitation of Schools at Increased Accountability Envelope 22 District Naseerabad, Jafarabad and Jhal Magsi AF - PK-PMU-GPEB-110311- CW-RFB / Package No 9 Component II: Quality and Single Stage - One 2021-05- Construction and TF / B0772 Post Request for Bids Open - National 271,232.00 202,768.62 Signed 2020-03-12 2020-04-02 2020-03-17 2020-04-03 2020-04-01 2020-04-18 2020-04-16 2020-05-06 2020-05-06 2020-06-16 Increased Accountability Envelope 06 Rehabilitation of Schools at District Ziarat and Harnai AF - PK-PMU-GPEB-110304- CW-RFB / Works Package 01, Construction and Component II: Quality and Single Stage - One 2021-04- TF / B0772 Post Request for Bids Open - National 271,232.00 249,965.39 Signed 2020-03-02 2020-04-03 2020-03-07 2020-04-03 2020-03-22 2020-04-18 2020-04-06 2020-05-06 2020-04-26 2020-06-16 Rehabilitation of Schools at Increased Accountability Envelope 26 District Killa Abdullah and Pishin. AF - PK-PMU-GPEB-110306- CW-RFB / Works Package No 3 Component II: Quality and Single Stage - One 2021-04- Construction and TF / B0772 Post Request for Bids Open - National 135,616.00 64,882.47 Signed 2020-03-02 2020-04-02 2020-03-07 2020-04-03 2020-03-22 2020-04-18 2020-04-06 2020-05-06 2020-04-26 2020-06-16 Increased Accountability Envelope 26 Rehabilitation of Schools at District Killa Saifullah AF - PK-PMU-GPEB-110305- CW-RFB / Works Package No 2, Component II: Quality and Single Stage - One 2021-04- TF / B0772 Post Request for Bids Open - National 271,232.00 261,020.65 Signed 2020-03-02 2020-04-03 2020-03-07 2020-04-03 2020-03-08 2020-04-18 2020-03-23 2020-05-06 2020-04-12 2020-06-16 Construction and Increased Accountability Envelope 12 Rehabilitation of Schools at District Quetta & Mastung. PK-PMU-GPEB-117836-CW- RFB / Package # 5 Component II: Quality and Single Stage - One 2021-04- Construction and TF / B0772 Post Request for Bids Open - National 271,232.00 205,007.88 Signed 2020-02-15 2020-04-02 2020-02-20 2020-04-03 2020-03-06 2020-04-18 2020-03-21 2020-05-06 2020-04-10 2020-06-16 Increased Accountability Envelope 10 Rehabilitation of Schools at District Sibi and Kachi AF - PK-PMU-GPEB-110313- CW-RFB / Package No 11 Component II: Quality and Single Stage - One 2021-11- Construction and TF / B0772 Post Request for Bids Open - National 135,616.00 89,971.90 Signed 2020-03-12 2020-04-03 2020-03-17 2020-04-03 2020-10-18 2020-04-20 2020-11-02 2020-05-06 2020-11-22 2020-06-16 Increased Accountability Envelope 22 Rehabilitation of Schools at District Chaghi AF - PK-PMU-GPEB-110307- CW-RFB / Package No 4 Component II: Quality and Single Stage - One 2021-04- Construction and TF / B0772 Post Request for Bids Open - National 271,232.00 199,923.43 Signed 2020-03-02 2020-04-03 2020-03-07 2020-04-03 2020-03-22 2020-04-18 2020-04-06 2020-05-06 2020-04-26 2020-06-16 Increased Accountability Envelope 26 Rehabilitation of Schools at District Nushki and Kharan. Page 1 AF - PK-PMU-GPEB-110315- CW-RFB / Package No 13 Construction and Component II: Quality and Single Stage - One 2021-05- TF / B0772 Post Request for Bids Open - National 271,232.00 172,624.75 Signed 2020-03-30 2020-04-02 2020-04-04 2020-04-03 2020-04-26 2020-04-20 2020-05-11 2020-05-06 2020-05-31 2020-06-16 Rehabilitation of Schools at Increased Accountability Envelope 31 District Dera Bugti & Sohbatpur AF - PK-PMU-GPEB-110310- CW-RFB / Package No 8 Component II: Quality and Single Stage - One 2021-04- Construction and TF / B0772 Post Request for Bids Open - National 271,232.00 223,974.80 Signed 2020-03-12 2020-04-03 2020-03-17 2020-04-03 2020-03-19 2020-04-18 2020-04-03 2020-05-06 2020-04-23 2020-06-16 Increased Accountability Envelope 23 Rehabilitation of Schools at District Lasbela & Awaran PK-PMU-GPEB-147776-CW- RFB / Package No 17 Component II: Quality and Single Stage - One 2021-05- Construction and TF / B0772 Post Request for Bids Open - National 271,232.00 134,757.90 Signed 2020-03-30 2020-04-03 2020-04-04 2020-04-03 2020-04-19 2020-04-20 2020-05-04 2020-05-06 2020-05-24 2020-06-16 Increased Accountability Envelope 24 Rehabilitation of Schools at District Loralai and Duki PK-PMU-GPEB-147777-CW- RFB / Package No 18 Component II: Quality and Single Stage - One 2021-05- Construction and TF / B0772 Post Request for Bids Open - National 271,232.00 148,240.40 Signed 2020-03-30 2020-04-03 2020-04-04 2020-04-03 2020-04-19 2020-04-20 2020-05-04 2020-05-06 2020-05-24 2020-06-16 Increased Accountability Envelope 24 Rehabilitation of Schools at District Kohlu and Barkhan GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PMU-GPEB-47950-GO- RFB / Procurement of Component II: Quality and Single Stage - One Equipments for IT Labs for TF / 19124 Post Request for Bids Open - National 189,718.00 195,343.74 Completed 2018-03-01 2018-10-16 2018-03-06 2018-03-21 2018-11-01 2018-04-10 2018-11-27 2018-05-20 2018-12-12 2018-11-16 2019-01-16 Increased Accountability Envelope Upraded High Schools. (Package 2) PK-PMU-GPEB-47955-GO- RFB / Procurement of Solar Component II: Quality and Single Stage - One TF / 19124 Post Request for Bids Open - National 189,718.00 0.00 Canceled 2018-03-01 2018-10-10 2018-03-06 2018-03-21 2018-11-01 2018-04-10 2018-05-20 2018-11-16 System for Upgraded High Increased Accountability Envelope Schools.(Package 2) PK-PMU-GPEB-47961-GO- Component II: Quality and Request for Single Stage - One RFQ / Procurement of Goods TF / 19124 Post Open - National 8,000.00 0.00 Canceled 2018-03-20 2018-04-28 2018-10-25 Increased Accountability Quotations Envelope for Special Chidren PK-PMU-GPEB-47966-GO- RFQ / Printing of Teacher Component II: Quality and Request for Single Stage - One Training Material on TF / 19124 Post Open - National 10,000.00 3,331.55 Completed 2018-03-25 2018-05-05 2019-02-18 2018-11-01 2019-04-01 Increased Accountability Quotations Envelope Environmental Safeguard Issues PK-PMU-GPEB-61607-GO- RFB / Procurement of 620 Bio Component I: Access and Single Stage - One Metric Devices for School TF / 19124 Post Request for Bids Open - National 298,000.00 0.00 Canceled 2018-05-07 2018-05-10 2018-05-25 2018-05-30 2018-06-22 2018-12-19 Equity Envelope Teachers Attendance and monitoring. PK-PMU-GPEB-92223-GO- RFQ / PMU has planned to provide Fire Extinguishers, Firm Alarm and Fire Blankets Component I: Access and Request for Single Stage - One TF / 19124 Post Open - National 15,000.00 9,956.12 Completed 2018-12-29 2019-01-29 2019-01-18 2019-02-28 2019-02-04 to 25 High Schools as disaster Equity Quotations Envelope preparedness management and social safeguard in Science and IT Labs. PK-PMU-GPEB-92227-GO- RFQ / PMU has also planned to provide Sports Items of 50 High Schools to promote Component I: Access and Request for Single Stage - One healthy environment at TF / 19124 Post Open - National 66,700.00 49,016.09 Completed 2018-12-29 2019-01-11 2019-01-31 2019-03-12 2019-03-05 Equity Quotations Envelope schools with tentative cost of PKR 07 Million through shopping, directly from Sialkot. PK-PMU-GPEB-99228-GO- RFQ / Following World Bank Instructions, PMU has initiated Component I: Access and Request for Single Stage - One TF / 19124 Post Open - National 53,000.00 0.00 Canceled 2019-02-20 2019-03-14 2019-05-13 a pilot maintenance free Equity Quotations Envelope solarization of 50 Primary Schools PK-PMU-GPEB-113871-GO- RFQ / Procurement of Science Component II: Quality and Request for Single Stage - One Lab. Equipment for 10 High TF / 19124 Post Open - National 50,000.00 31,542.71 Completed 2019-05-10 2019-05-29 2019-05-23 2019-05-29 2019-07-02 2019-09-30 Increased Accountability Quotations Envelope Schools - Saving identified from FX-Gain PK-PMU-GPEB-113873-GO- RFB / Procurement of Furniture for 10 additional Schools - Savings identified Component II: Quality and Single Stage - One TF / 19124 Post Request for Bids Limited 107,500.00 0.00 Canceled 2019-05-09 2019-05-10 2019-05-11 2019-05-12 2019-05-14 2019-07-13 from Fx-Gain - Through Increased Accountability Envelope Contract Addendum/Variation Order in existing Contract for Furniture PK-PMU-GPEB-110331-GO- RFB / AF - Procurement of Component II: Quality and Single Stage - One TF / B0772 Post Request for Bids Open - National 1,193,701.00 1,072,904.18 Signed 2020-02-05 2020-02-10 2020-02-10 2020-02-11 2020-03-03 2020-03-04 2020-03-23 2020-04-23 2020-04-27 2020-05-18 2021-04-27 School Furniture for 300 BES Increased Accountability Envelope Schools PK-PMU-GPEB-110350-GO- RFQ / AF - Procurement of Component II: Quality and Request for Single Stage - One TF / B0772 Post Limited 20,779.00 21,175.24 Signed 2020-03-03 2020-04-11 2020-04-21 2020-04-24 2020-10-18 TLM Story Books and Teachers Increased Accountability Quotations Envelope Guides from Book Group PK-PMU-GPEB-110339-GO- Component II: Quality and Single Stage - One RFB / Procurement of School TF / B0772 Post Request for Bids Open - National 394,360.00 0.00 Canceled 2020-02-10 2020-02-19 2020-02-15 2020-03-08 2020-03-28 2020-05-02 2021-04-15 Increased Accountability Envelope and classroom articles Page 2 AF - PK-PMU-GPEB-110353- GO-RFQ / Procurement of Component II: Quality and Request for Single Stage - One TF / B0772 Post Open - National 48,701.00 43,237.40 Signed 2020-03-14 2020-04-10 2020-05-07 2020-05-04 2020-11-03 Sport items for 300 BESP Increased Accountability Quotations Envelope Schools PK-PMU-GPEB-147619-GO- RFQ / Procurement of ECE Component II: Quality and Request for Single Stage - One materials for ECE class TF / B0772 Post Open - National 19,480.00 27,411.22 Signed 2020-03-21 2020-04-10 2020-05-09 2020-05-04 2020-12-05 Increased Accountability Quotations Envelope (blocks, toys, numbers, alphabets etc PK-PMU-GPEB-147632-GO- Component II: Quality and Request for Single Stage - One RFQ / Procurement of E- TF / B0772 Post Open - National 14,286.00 9,961.43 Signed 2020-03-30 2020-04-10 2020-05-23 2020-05-05 2020-11-19 Increased Accountability Quotations Envelope learning equipment AF - PK-PMU-GPEB-110345- GO-RFQ / Procurement of ECE Component II: Quality and Request for Single Stage - One Kits produced by Adult Basic TF / B0772 Post Limited 54,545.00 59,234.44 Signed 2020-02-22 2020-04-11 2020-04-18 2020-04-24 2020-10-15 Increased Accountability Quotations Envelope Education Society (ABES) was established in 1971 PK-PMU-GPEB-167252-GO- Component II: Quality and Request for Single Stage - One RFQ / Procurement of School TF / B0772 Post Open - National 82,314.00 79,214.96 Signed 2020-04-04 2020-04-10 2020-04-27 2020-05-06 2021-04-27 Increased Accountability Quotations Envelope Amenities PK-PMU-GPEB-167262-GO- Component II: Quality and Request for Single Stage - One RFQ / Procurement of Reading TF / B0772 Post Open - National 120,874.00 116,430.85 Signed 2020-04-04 2020-04-10 2020-04-27 2020-04-30 2021-04-27 Increased Accountability Quotations Envelope / Writing Material PK-PMU-GPEB-167263-GO- Component II: Quality and Request for Single Stage - One RFQ / Procurement of Gillam TF / B0772 Post Open - National 98,947.00 91,850.47 Signed 2020-04-04 2020-04-10 2020-04-27 2020-04-29 2021-04-27 Increased Accountability Quotations Envelope Carpet PK-PMU-GPEB-195932-GO- RFB / Procurement of COVID- Component II: Quality and Single Stage - One 19 response material for 1086 TF / B0772 Post Request for Bids Open - National 486,245.00 473,417.66 Signed 2020-10-26 2020-11-18 2020-10-31 2020-11-18 2020-11-21 2020-12-09 2020-12-06 2021-01-04 2020-12-28 2021-01-15 2021-03-28 Increased Accountability Envelope High Schools and 200 BESP Schools PK-PMU-GPEB-195727-GO- RFB / Procurement of Science Component II: Quality and Single Stage - One TF / B0772 Post Request for Bids Open - National 697,938.00 644,785.09 Signed 2021-01-04 2021-01-21 2021-01-06 2021-01-22 2021-01-27 2021-02-12 2021-02-11 2021-02-17 2021-02-27 2021-02-25 2021-04-28 Lab Equipments for 83 BES Increased Accountability Envelope High Schools PK-PMU-GPEB-212881-GO- Under RFQ / Procurement of TLM Component II: Quality and Request for Single Stage - One TF / B0772 Post Limited 50,809.00 0.00 Implementati 2021-01-14 2021-02-07 2021-04-08 Story Books and Teachers Increased Accountability Quotations Envelope on Guide from Book Group PK-PMU-GPEB-212888-GO- RFQ / Procurement of Under Component II: Quality and Request for Single Stage - One Facilitation Kit for Students TF / B0772 Post Limited 117,254.00 0.00 Implementati 2021-01-14 2021-02-03 2021-04-19 Increased Accountability Quotations Envelope (Bags & Stationery) South on Region PK-PMU-GPEB-212891-GO- RFQ / Procurement of Under Component II: Quality and Request for Single Stage - One Facilitation Kit for Students TF / B0772 Post Limited 120,361.00 0.00 Implementati 2021-01-14 2021-02-08 2021-02-03 2021-04-19 Increased Accountability Quotations Envelope (Bags & Stationery) North on Region PK-PMU-GPEB-212893-GO- Under RFQ / Procurement of Component II: Quality and Request for Single Stage - One TF / B0772 Post Limited 33,471.00 0.00 Implementati 2021-01-14 2021-02-01 2021-03-18 Learning Material for Primary, Increased Accountability Quotations Envelope on Middle and High Schools PK-PMU-GPEB-224365-GO- Under RFQ / Procurement of Component II: Quality and Request for Single Stage - One TF / B0772 Post Limited 10,780.00 0.00 Implementati 2021-03-17 2021-03-31 2021-04-30 Equipments for Differently Increased Accountability Quotations Envelope on abled Students PK-PMU-GPEB-224360-GO- RFQ / Printing of ECE Under Academic Calander, Component II: Quality and Request for Single Stage - One TF / B0772 Post Open - National 49,375.00 0.00 Implementati 2021-03-19 2021-04-01 2021-04-16 Laboratory Safety Guidelines Increased Accountability Quotations Envelope on and Covid Precautionary Material NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AF - PK-PMU-GPEB-110358- Component III: TA for Request for Single Stage - One NC-RFQ / Hiring of Teachers TF / B0772 improved capacity for Post Open - National 35,714.00 0.00 Canceled 2019-12-30 2020-03-01 2021-02-14 Quotations Envelope Testing Firm management and monitoring PK-PMU-GPEB-147604-GO- DIR / Hiring of firm for soil/ Component II: Quality and TF / B0772 Post Direct Selection Direct 10,958.00 10,071.20 Signed 2020-02-07 2020-02-04 2020-02-12 2020-02-10 2020-03-23 2020-06-08 2020-06-21 geo technical investigations Increased Accountability for school construction PK-PMU-GPEB-147608-GO- Pending Component II: Quality and DIR / Hiring of firm for Water TF / B0772 Post Direct Selection Direct 16,234.00 0.00 Implementati 2020-02-10 2020-02-15 2020-03-26 2020-09-22 Increased Accountability Test on PK-PMU-GPEB-167264-NC- Under Component I: Access and Request for Single Stage - One RFQ / Hiring of TF / B0772 Post Open - National 48,431.00 0.00 Implementati 2020-04-04 2020-04-10 2020-04-27 2021-05-31 Equity Quotations Envelope Transportation Services on (Buses) PK-PMU-GPEB-224371-NC- RFQ / Procurement of Radio Transmission Services for Under Component II: Quality and Awareness Campaign for TF / B0772 Post Direct Selection Direct 800.00 0.00 Implementati 2021-03-16 2021-03-24 2021-03-19 2021-03-29 2021-04-28 Increased Accountability masses of Balochistan against on Covid-19 from Radio Pakistan and FM96 Page 3 PK-PMU-GPEB-233520-NC- RFQ / Hiring of media and communication firm to document the impact of the Pending project interventions through Component II: Quality and Request for Single Stage - One TF / B0772 Post Open - National 27,550.00 0.00 Implementati 2021-05-19 2021-05-31 2021-06-25 short videos, documentation Increased Accountability Quotations Envelope on of short stories and showcase the project achievements among stakeholders and donors PK-PMU-GPEB-236067-NC- DIR / The contract has been signed with CTSP for recruitment of 200 EST. Pending Component I: Access and Initially the amount has been TF / B0772 Post Direct Selection Direct 9,625.00 0.00 Implementati 2021-05-24 2021-05-25 2021-05-28 2021-06-29 Equity paid by candidates however on the amount is being paid by the PMU for the new candidates only. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PMU-GPEB-118034-CS- QCBS / New Hiring of internal auditors for E.U project, in order to avoid familiarity or Component III: TA for Consultant intimidation threats that may TF / B0772 improved capacity for Post Qualification Open - National 26,786.00 34,396.01 Signed 2020-02-12 2020-03-30 2020-03-03 2020-04-02 2020-03-28 2020-06-19 2020-04-02 2020-08-31 2020-04-22 2020-11-30 2022-02-08 be created on continuation of management and monitoring Selection existing internal audit firm. For quality of works PMU has decided to hire new audit firm. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PMU-GPEB-68182-CS- CDS / For the purpose of promoting quality education PMU has identified to initiate the online education for the Component II: Quality and TF / 19124 Prior Direct Selection Direct 14,250.00 0.00 Canceled 2018-07-10 2018-07-20 2018-09-23 2018-12-22 upgraded high schools Increased Accountability through tutorial videos and learning resource of Sabaq.com, based on exact syllabus of Balochistan board. PK-PMU-GPEB-92207-CS- INDV / PMU has planned to Individual train High School Information Component I: Access and TF / 19124 Post Consultant Open 1,910.00 1,432.15 Completed 2018-12-20 2018-11-26 2019-01-30 2018-12-18 2019-02-01 2018-12-19 2019-02-05 2019-01-21 2019-03-07 2018-12-22 Technology Teachers on IT Equity Selection Lab Administration and Teaching Methodologies. PK-PMU-GPEB-92213-CS- INDV / Following World Bank Instruction on Future Operating Policy for Solar Individual Component I: Access and Equipment installed at High TF / 19124 Post Consultant Open 900.00 179.02 Completed 2018-12-20 2018-11-26 2019-01-01 2018-12-18 2019-01-03 2018-12-19 2019-01-07 2018-12-17 2019-02-06 2018-12-21 Equity Schools, PMU has planned to Selection train High School IT Teacher on Operating and trouble shooting Solar System PK-PMU-GPEB-92218-CS- INDV / PMU has planned to produce a documentary Film Individual on GPE-BEP impact Component II: Quality and TF / 19124 Post Consultant Open 10,000.00 6,516.29 Completed 2019-01-15 2018-10-27 2019-02-04 2019-01-13 2019-02-09 2019-01-14 2019-02-19 2019-01-15 2019-03-21 2019-03-15 assessment and schools being Increased Accountability Selection constructed with support of World Bank and Global Partnership for Education PK-PMU-GPEB-104028-CS- INDV / Mr. Irfan Bakhtiari has has been identified to conduct Individual the Environment and Social Component II: Quality and TF / 19124 Post Consultant Direct 4,000.00 6,636.07 Completed 2019-03-06 2019-03-06 2019-03-10 2019-03-08 2019-03-14 2019-03-22 2019-03-22 2019-03-15 2019-04-21 2019-04-30 Impact Assessment (ESIA) of Increased Accountability Selection European Union project who is well qualified and possess a rich working experience. PK-PMU-GPEB-116261-CS- Component III: TA for Individual Under INDV / Hiring of Manager TF / 19124 improved capacity for Post Consultant Open 35,000.00 2,255.37 2019-06-03 2019-06-04 2019-07-02 2019-07-09 2019-07-07 2019-09-02 2019-07-17 2020-10-31 Implementation Financial Management management and monitoring Selection PK-PMU-GPEB-116270-CS- Component III: TA for Individual Under INDV / Hiring of Procurement TF / 19124 improved capacity for Post Consultant Open - National 30,000.00 0.00 2019-06-03 2019-06-04 2019-07-02 2019-11-02 2019-07-07 2019-11-01 2019-07-17 2020-10-31 Implementation Specialist management and monitoring Selection PK-PMU-GPEB-110356-CS- Component III: TA for CDS / AF - Hiring of EDS&QA TF / 19124 improved capacity for Post Direct Selection Direct 414,286.00 388,599.76 Signed 2019-06-17 2019-10-28 2019-06-27 2019-11-14 2019-08-11 2020-01-06 2020-10-31 Firm for EU AF management and monitoring PK-PMU-GPEB-118045-CS- CDS / Balochistan Examination and Assessment Commission (BEAC) is an autonomous body working under the umbrella of Component II: Quality and TF / 19124 Post Direct Selection Direct 21,429.00 0.00 Canceled 2019-07-15 2019-07-25 2019-08-24 2020-10-31 Secondary Education Increased Accountability Department. It has its own financial controls and has been instrumental in undertaking Learning Assessment of GPE-BEP. Page 4 PK-PMU-GPEB-167266-CS- INDV / Hiring of Individual Individual Component I: Access and Consultant for impact TF / B0772 Post Consultant Limited 10,000.00 10,903.43 Signed 2020-04-03 2020-04-13 2020-04-08 2020-07-30 2020-04-18 2020-09-01 2020-05-02 2020-09-04 2020-07-01 Equity assessment of transportation Selection activity Page 5 18-MONTH PROCUREMENT PLAN Project information: Phase I of Improved Child Survival Program for Human Capital MPA- P167156-- Immunization Plus and Malaria Progress by Accelerating Coverage and Transforming Services (IMPACT) Project Project Implementation Agencies: Federal Ministry of Health (NMEP and NPHCDA) Date of the Procurement Plan: January 1, 2020 Period covered by this Procurement Plan: January 2020 to June 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016), revised on November 1, 2017 and on August 1, 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Nigeria Public Procurement Act 2007, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [15% is applicable for those contracts identified in the Procurement Plan tables]; Works: [ 7.5% is applicable for those contracts identified in the Procurement Plan tables] I. Threshold for Prior Review – Goods, Works, Non-Consulting Services and Consulting Services Prior-review Thresholds Thresholds for Procurement Methods High Substanti Moderate Low Risk Goods, IT & Non-Consulting Shortlist of National Procurement Type Risk al Risk Risk Works ($'000) ($'000) ($'000) ($'000) Services Consultants Request Request Engineering Open for for Open Open Open Consultin & Quotatio Quotatio 10,0 15,0 20,0 Internatio National internatio National g Constructio Works n or n or 5,000 00 00 00 nal or ICB or NCB National nal or ICB or NCB National Services n ($'000) ($'000) ($'000) ($'000) ($'000) Supervision Shopping Shopping ($'000) ($'000) ($'000) Goods, IT & Non- 2,0 4,0 6,0 Consulting Services 1,500 00 00 00 ≧ < ≦ ≧ < ≦ < ≦ Consultants 1,0 2,0 4,0 20,0 20,0 5,0 5,0 1 3 5 200 (Firms) 500 00 00 00 00 00 00 00 00 00 00 Post Review: All contracts not subject to prior review shall be subject to post review. Summary of the procurement packages for Goods, Works and Non-Consulting Services (Planned for the first 18 months after project effectiveness): Selec Evaluation Market tion Options Approa Review Meth (Most Expected ch Prequal- Domestic Expected by od Advantageo date of Sr. Contract Estimated (Open- ification Preferenc date of Bank (RFP, us Bid, bid/ No Description Cost (US$) Nation (Yes/ e Contract (Prior/ RFB, BAFO, proposal al/ No) (Yes/No) Signature Post) RFQ, Rated opening Limited DS Criteria etc.) etc.) etc.) Nigeria Malaria Elimination Programme (NMEP) GOODS Procurement of Long Lasting Open- Insecticide Internati Most Treated Nets 45,852,523 3rd Feb 13th July 1 Prior onal RFB Advantageou No Yes (Mass .29 2020 2020 s Bid Campaign & Routine Distribution) Procurement of Artemisinin based Open - Most National 3rd Feb 13th July 2 Combination Post 2,381,472 RFB Advantageou No No 2020 2020 Therapy (ACT)- s Bid (Public and Private) Procurement of Open- Most Rapid National 3rd Feb 13th July 3 Post 1,960,202 RFB Advantageou No No Diagnostics 2020 2020 s Bid Tests (RDTs) Most Artesunate Open- 3rd Feb 13th July 4 Post 420,881.89 RFB Advantageou No No Injection National 2020 2020 s Bid Sulphodoxine/P Most Open - 3rd Feb 13th July 5 yrimethamine_I Post 612,322 RFB Advantageou No No National 2020 2020 PTp s Bid Amodiaquine/Su Most lphodoxine/Pyri 2,990,781. Open - 3rd Feb 13th July 6 Post RFB Advantageou No No methamine 47 National 2020 2020 s Bid (SPAQ) Most Open - 3rd Feb 13th July 7 Sharp Boxes Post 152,122,43 RFB Advantageou No No National 2020 2020 s Bid Most Microscope Open - 3rd Feb 13th July 8 Post 491,031 RFB Advantageou No No commodities National 2020 2020 s Bid NON-CONSULTING SERVICES - NMEP State Malaria Elimination MOU/P Programme erform 10th 2,250,000. 9th July 1 (SMEP) Prior Limited ance Rated Criteria No NA February 00 2020 Performance Contra 2020 Contract and ct Operations National Malaria Elimination MOU/P Programme erform 10th 1,500,000. 9th July 2 (NMEP) Prior Limited ance Rated Criteria No NA February 00 2020 Performance Contra 2020 Contract and ct Operations National Primary Health Care Development Agency (NPHCDA) GOODS Procurement of Most vaccines and 61,380,767 5th Feb 13th July 1 Prior UN RFB Advantageou No No devices for .00 2020 2020 s Bid immunization Procurement and maintenance of Most UN 5th Feb 13th July 2 Generators and Post 900,000.00 RFB Advantageou No No System 2020 2020 Cold Chain s Bid Equipment (CCEs) Procurement and installation of Cold Chain Most 4,500,000. 5th Feb 13th July 3 Hubs (3 Prior UN RFB Advantageou No No 00 2020 2020 walking-in cold s Bid rooms) in Lagos Procurement of Emergency Transport 5th Feb 13th July 4 Service (ETS) Post 45,101.72 Limited RFQ Rated Criteria No No 2020 2020 vouchers, handbooks, and logbooks Procurement of Most Open- 5th Feb 13th July 5 equipment for Post 281,969.00 RFB Advantageou No No National 2020 2020 call centre s Bid Most Procurement of Open- 5th Feb 13th July 6 Post 969,529.00 RFB Advantageou No No 14 vehicles National 2020 2020 s Bid Procurement of 5th Feb 13th July 7 14 computer Post 14,000 Limited RFQ Rated Criteria No No 2020 2020 sets II. Summary of the procurement packages for Consulting Services -Planned for the first 18 months after project effectiveness): Selection Market Method Review Approach Expected Expected Estimate (QCBS, Shortlisti Sr. by Bank (Open - date of bid/ date of Contract Description d Cost FBS, ng No (Prior/ International proposal Contract (US$) LCBS, (Yes/ No) Post) / National/ opening Signature QBS, CQS, etc.) DS etc.) Nigeria Malaria Elimination Programme (NMEP) NGOs Service Contract (for 5 11,525,51 Open 10th Feb 31st Aug 1 Prior QCBS Yes states) 1.00 International 2020 2020 Technical Assistance to SMEP in 5 participating states, 630,000.0 10th Feb 31st July 2 Prior Limited INDV No multiple contracts by 0 2020 2020 different consultants Technical Assistance to NMEP (including procurement 150,000.0 10th Feb 31st July 3 Post Limited INDV No consultant), multiple 0 2020 2020 contracts. Independent Verification 300,000.0 Open- 10th Feb 31st July 4 Post CQS No Agents (IVA) for NGOs 0 National 2020 2020 Social and Behavioral Change 3,000,000. Open 10th Feb 31st Aug 5 Prior QCBS Yes Communication (SBCC) 00 International 2020 2020 Operations research on 2,131,148. Open 10th Feb 31st Aug 6 Prior QCBS Yes disease vector mapping 00 International 2020 2020 Operations research on entomological surveillance by 655,738.0 10th Feb 31st July 7 Prior Direct DS No Nigeria Institute of 0 2020 2020 Medical Research (NIMR) Operations research on therapeutic efficacy by 655,738.0 10th Feb 31st July 8 Prior Direct CDS No Nigeria Institute of 0 2020 2020 Medical Research (NIMR) Consultancy on warehouse 10th Feb 31st July 9 Post 32,131.00 Limited INDV No assessment 2020 2020 Programme Management Training (case management, 2,000,000. 10th Feb 31st July 10 Prior Limited INDV No M&E, IVM etc.) Multiple 00 2020 2020 Contracts National Primary Health Care Development Agency (NPHCDA) Technical assistance support 9,869,000. 10th Feb 31st July 1 to government for polio Prior UN CDS No 00 2020 2020 surveillance Technical assistance support to government for polio 15,301,00 10th Feb 31st July 2 Supplemental Immunization Prior UN CDS No 0.00 2020 2020 Activities (SIAs) surveillance through WHO Technical assistance support to government for polio 4,830,000. 10th Feb 31st July 3 logistics and social Prior UN CDS No 00 2020 2020 mobilization for polio through UNICEF Procurement of consultant for 10th Feb 31st July 4 Post 20,000.00 Limited INDV No landscape survey (SQUATS) 2020 2020 Technical assistance support 837,673.1 10th Feb 31st July 5 Prior Open-National INDV No to 12 SPHCDA PIU 3 2020 2020 Technical assistance support 10th Feb 31st July 6 Post 89,750.63 Limited INDV No to NPHCDA PIU 2020 2020 Procurement of Emergency Transport Services (ETS), MOU with National Union of 530,794.3 10th Feb 31st July 7 Prior Direct CDS No Road Transport Workers 9 2020 2020 (NURTW) and NACTOROMAS Training of ETS service providers, MOU with Federal 207,672.0 10th Feb 31st July 8 Post Direct CDS No Road Safety Commission 0 2020 2020 (FRSC) Conduct PAPA – Lot Quality Assurance Sampling, MOU 2,213,850. 10th Feb 31st July 9 Prior Limited CDS No with National Bureau of 00 2020 2020 Statistics (NBS) Consultancy for RCT research 1,902,356. 10th Feb 31st Aug 10 services with Nigerian Prior Open-National QCBS Yes 00 2020 2020 Universities Procurement of operations 1,689,751. Open- 10th Feb 31st Aug 11 Prior QCBS Yes research services 00 International 2020 2020 Support to Cold Chain Equipment (CCE) 23,000,00 10th Feb 31st July 12 Prior UN CDS No optimization platform 0.00 2020 2020 through UNICEF Technical assistance to 1,553,185. 10th Feb 31st July 13 LGHAs (89 total), multiple Post Open-National INDV No 50 2020 2020 contracts Technical assistance 310,076.0 10th Feb 31st July 14 Post Open-National QCBS Yes management firm 0 2020 2020 10th Feb 31st July 15 IVA for performance contract Post 300,000 Open-National CQS No 2020 2020 Procurement of services 3,203,345 Open- 10th Feb 31st Aug 16 for GIS imagery and Prior QCBS Yes .45 International 2020 2020 microplanning Procurement of Social Behaviour Change Open- 10th Feb 31st Aug 17 Prior 5,000,000 QCBS Yes Communication (SBCC) International 2020 2020 services Contracting of direct 2,000,000. Open- 10th Feb 31st Aug 18 Prior QCBS Yes facility financing firms 00 International 2020 2020 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Nigeria : Nigeria Improved Child Survival Program for Human Capital MPA PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2021-01-08 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167156 GPN Date: Project Name: Nigeria Improved Child Survival Program for Human Capital MPA Loan / Credit No: IDA / 65390 NMEP MPA Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NMEP-GO-RFB-01 / Procurement of Long Lasting Pending Single Stage - One Insecticide Treated Nets (Mass IDA / 65390 Component 1:Malaria Control Prior Request for Bids Open - International 53,575,464.00 0.00 Implementati 2021-01-11 2021-01-16 2021-02-27 2021-03-29 2021-05-03 2021-10-30 Envelope Campaign & Routine on Distribution) NMEP-GO-RFB-02 / Procurement of Artemisinin based Combination Therapy (ACT); Procurement of (RDTs); Pending Artesunate Injection; Single Stage - One IDA / 65390 Component 1:Malaria Control Prior Request for Bids Open - National 18,925,600.00 0.00 Implementati 2021-01-11 2021-01-16 2021-02-27 2021-03-29 2021-05-03 2021-10-30 Sulphodoxine/Pyrimethamine_ Envelope on IPTp; Amodiaquine/Sulphodoxine/P yrimethamine (SPAQ); Sharp Boxes NMEP-GO-RFQ-03 / Pending Procurement of 2-number Request for Single Stage - One IDA / 65390 Component 1:Malaria Control Post Limited 111,666.00 0.00 Implementati 2021-01-16 2021-03-13 2021-09-09 Hilux vehicles for project Quotations Envelope on operation at the national level. NMEP-GO-RFQ-04 / Pending Request for Single Stage - One Purchase of Laptops (10) and IDA / 65390 Component 1:Malaria Control Post Limited 15,208.00 0.00 Implementati 2021-01-16 2021-03-13 2021-09-09 Quotations Envelope Printers (5) on NMEP-GO-RFQ-05 / Procurement of ICT office Pending Request for Single Stage - One equipment’s for improved IDA / 65390 Component 1:Malaria Control Post Limited 135,458.00 0.00 Implementati 2021-01-16 2021-03-13 2021-09-09 Quotations Envelope Visual meeting and other on communications. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NMEP-CS-CQS-3 / Consultant Pending Independent Verification IDA / 65390 Component 1:Malaria Control Post Qualification Limited 300,000.00 0.00 2021-03-09 2021-03-23 2021-04-22 2021-05-27 2021-11-23 Implementation Agents (IVA) for NGOs Selection NMEP-CS-QCBS-4 / Social Component 3: Knowledge for Quality And Cost- Pending and Behavioral Change IDA / 65390 Post Open - National 3,000,000.00 0.00 2021-03-09 2021-03-30 2021-05-13 2021-06-10 2021-07-10 2021-08-14 2021-09-18 2022-09-18 Change Based Selection Implementation Communication (SBCC) NMEP-CS-INDV-6 / Programme Management Quality And Cost- Pending IDA / 65390 Component 1:Malaria Control Post Open - National 2,000,000.00 0.00 2021-03-09 2021-03-30 2021-05-13 2021-06-10 2021-07-10 2021-08-14 2021-09-18 2022-09-18 Training (case management, Based Selection Implementation M&E, IVM etc.). Engage a firm NMEP-CS-QCBS-1 / Engagement of Non State Actors/NGOs to carry out full Quality And Cost- IDA / 65390 Component 1:Malaria Control Prior Open - National 11,525,511.00 0.00 Under Review 2021-05-10 2021-06-22 2021-05-31 2021-07-14 2021-08-11 2021-09-10 2021-10-15 2021-11-19 2022-11-19 scale implementation of the Based Selection malaria interventions in the states. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NMEP-CS-INDV-1 / Technical Assistance to SMEP in 6 Individual Pending participating states, multiple IDA / 65390 Component 1:Malaria Control Prior Consultant Limited 630,000.00 0.00 2021-03-09 2021-03-14 2021-04-04 2021-05-09 2021-11-05 Implementation contracts by different Selection consultants Page 1 NMEP-CS-INDV-2 / Technical Individual Assistance to NMEP (including IDA / 65390 Component 1:Malaria Control Post Consultant Limited 150,000.00 0.00 Canceled 2021-03-09 2021-03-25 2021-03-14 2021-04-04 2021-05-09 2021-11-05 procurement consultant), Selection multiple contracts. NMEP-CS-INDV-5 / Individual Pending Consultancy on warehouse IDA / 65390 Component 1:Malaria Control Post Consultant Limited 32,131.00 0.00 2021-03-09 2021-03-14 2021-04-04 2021-05-09 2021-11-05 Implementation assessment Selection NMEP-CS-INDV-3 / Technical Assistance to NMEP (including Under IDA / 65390 Component 1:Malaria Control Prior Direct Selection Direct 150,000.00 0.00 2021-03-29 2021-03-31 2021-04-08 2021-04-08 2021-06-12 2021-12-09 procurement consultant), Implementation multiple contracts. Page 2 PROCUREMENT PLAN Turkey Support to Refugees Transitioning Project information: to Communities Project (P171489) Project Implementation Turkish Red Crescent (Turk Kizilay) Agency: Date of the Procurement 13 March 2020 Plan: Period covered by this March 13, 2020 – March 31, 2021 Procurement Plan: I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Goods and Non-Consulting Services Selection Method Prior Review Selection Method Threshold Threshold Default Method (No Request for Bids/Open Contracts valued ≥ procurement method International $2,000,000 threshold) Request for Bids/Open National Goods, and Non-consulting Goods and Non- Services All post review consulting Services Contracts below $2,000,000 Request for Quotations (RFQ) Contracts valued less than Goods and Non- All post review $100,000 consulting Services Contracts valued ≥ Direct Selection No threshold $2,000,000 III. Selection of Consultants Selection Method Prior Review Selection Method Threshold Threshold Quality and Cost Default Method (No selection Contracts valued ≥ Based Selection method threshold) $1,000,000 Least Cost based No selection method Contracts valued ≥ Selection threshold $1,000,000 Consultants’ Contracts valued less than Qualification based All post review $300,000 Selection (CQS) Individual Consultants; and No selection method Contracts valued ≥ Direct Selection of threshold $300,000 Individual Consultants Direct Selection of No selection method Contracts valued ≥ Firms threshold $1,000,000 The terms of references of any financial audit, procurement or legal consultants financed by the project shall be sent to the Bank for its comments. IV. Special Arrangements 1. The Bank’s Standard Procurement Documents: Shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. For the procurements not subject to international competitive selection the procurement documents agreed by the Bank shall be used. 2. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. 3. National Procurement Arrangements: Not applicable. 4. Procurement of Second-Hand Goods: Not Applicable. 5. Domestic preference (as specified under paragraph 5.51 of the Procurement Regulations): Not applicable. 6. Operational costs will not be considered under procurement implementation. PROCUREMENT Turkey : Support to Harmonization in Turkey Project PLAN General Information Country: Turkey Bank’s Approval Date of the Original Procurement Plan: 2020-03-16 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171489 GPN Date: 2020-04-06 Project Name: Support to Harmonization in Turkey Project Loan / Credit No: / , TF / B0894 T Executing Agency(ies): urkish Red Crescent (Turk Kızılayı) WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TR-TRC-204348-GO-RFQ / Procurement of various Goods Support to Harmonization of Request for Single Stage - One to be used in Bicycle Events to TF / B0894 Refugees and Host Post Limited 8,305.68 Completed 2020-11-17 2020-12-01 2020-12-04 2020-12-08 2020-12-20 2020-12-21 Quotations Envelope be organized by Hatay and Communities Kilis Community Centers TR-TRC-205221-GO-RFQ / Supply of computers and Support to Harmonization of various goods to be used in Request for Single Stage - One TF / B0894 Refugees and Host Post Limited 18,104.21 Completed 2020-12-04 2020-12-16 2020-12-23 2020-12-22 2020-12-30 2020-12-29 the Technology workshop to Quotations Envelope Communities be established by the Hatay Community Center. TR-TRC-205228-GO-RFQ / Supply of furniture to be used Support to Harmonization of Request for Single Stage - One for the technology workshop TF / B0894 Refugees and Host Post Limited 1,954.28 Completed 2020-12-04 2020-11-27 2020-12-23 2020-12-08 2021-01-12 2020-12-28 Quotations Envelope to be established by the Hatay Communities Community Center. TR-TRC-205229-GO-RFQ / Support to Harmonization of Pending Supply of goods for Kilis Request for Single Stage - One TF / B0894 Refugees and Host Post Limited 0.00 Implementati 2020-12-01 2020-12-18 2020-12-31 Community Center model Quotations Envelope Communities on aircraft and drone workshop TR-TRC-205305-GO-RFQ / Supply of various sports Support to Harmonization of goods to be used in sports Request for Single Stage - One TF / B0894 Refugees and Host Post Limited 23,099.00 Completed 2020-12-02 2020-12-21 2020-12-24 2020-12-28 2021-01-13 2021-01-14 activities organized by Quotations Envelope Communities Kahramanmaraş, Adana, Hatay and Kilis Community Centers. Support to Harmonization of TRC-GOODS-4 / Support Kit Request for Single Stage - One / Refugees and Host Post Open - National 0.00 Canceled 2020-03-25 2020-05-20 2020-08-18 (2400 items) Quotations Envelope Communities TRC-GOODS-5 / Social Support to Harmonization of Request for Single Stage - One Cohesion pilot equipments / Refugees and Host Post Open - National 0.00 Canceled 2020-04-27 2020-06-22 2020-07-22 Quotations Envelope and supplies cost Communities TRC-GOODS-2 / Mobile Support to Harmonization of Request for Single Stage - One phones for use of project / Refugees and Host Post Limited 0.00 Canceled 2020-03-11 2020-05-06 2021-05-06 Quotations Envelope consultants and HQ (4 items) Communities TRC-GOODS-3 / Harmonisation training-small Support to Harmonization of Request for Single Stage - One goods incentive (cups, / Refugees and Host Post Open - National 0.00 Canceled 2020-03-25 2020-05-20 2020-06-19 Quotations Envelope pencils,notebooks, etc.) Communities (multiple trainings) TRC-GOODS-1 / Laptop for delivery of component one Support to Harmonization of activities and HQ (13 items) Request for Single Stage - One / Refugees and Host Post Limited 0.00 Canceled 2020-03-11 2020-05-06 2021-05-06 and projection (equipment) Quotations Envelope Communities for harmonisation programme (4 items) TR-TRC-209990-GO-RFQ / Procurement various for the items of hygiene kits to be Support to Harmonization of Request for Single Stage - One distributed to beneficiaries in TF / B0894 Refugees and Host Post Limited 71,217.80 Completed 2021-01-05 2021-01-14 2021-01-29 2021-02-22 2021-03-19 2021-03-17 Quotations Envelope Hatay, Kilis, Kahramanmaraş Communities and Adana Community Centers TR-TRC-229470-GO-RFB / Within the scope of the Support to Harmonization of Under project of Turkey Single Stage - One TF / B0894 Refugees and Host Post Request for Bids Open - National 0.00 Implementati 2021-04-19 2021-04-19 2021-04-26 2021-05-18 2021-05-18 2021-05-28 2021-06-04 2021-09-20 Harmonization Project; Envelope Communities on procurement of Mobile Theater stage TR-TRC-236155-GO-RFQ / Procurement of various goods Support to Harmonization of Request for Single Stage - One to be used in sports events to TF / B0894 Refugees and Host Post Limited 5,758.67 Signed 2021-05-25 2021-05-25 2021-05-28 2021-06-02 2021-06-10 Quotations Envelope be organized by Hatay and Communities Adana Community Centers TR-TRC-236172-GO-RFQ / Procurement of various goods Support to Harmonization of Request for Single Stage - One to be used in sports events to TF / B0894 Refugees and Host Post Limited 0.00 Canceled 2021-05-26 2021-05-31 2021-06-03 Quotations Envelope be organized by Hatay and Communities Adana Community Centers Page 1 TR-TRC-238529-GO-RFQ / Provision of sports equipment Support to Harmonization of Under for the table tennis activity Request for Single Stage - One TF / B0894 Refugees and Host Post Limited 0.00 Implementati 2021-06-08 2021-06-08 2021-06-25 2021-07-05 within the Support to Quotations Envelope Communities on Harmonization in Turkey Project NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TR-TRC-238553-NC-RFQ / Provision of the social cohesion training of trainers Support to Harmonization of Under (TOT) services and materials Request for Single Stage - One TF / B0894 Refugees and Host Post Limited 0.00 Implementati 2021-06-08 2021-06-09 2021-06-18 2021-07-02 where will conduct in Adana Quotations Envelope Communities on province within the scope of the Support to Harmonization in Turkey Project. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TRC-CONS-6 / Financial Consultant Pending verification and auditing / Project Management Post Qualification Open - National 0.00 2020-10-19 2020-11-09 2020-12-23 2021-01-22 2021-02-26 2021-06-26 Implementation service Selection Consultant TRC-CONS-7 / M&E activities / Project Management Post Qualification Open - National 0.00 Canceled 2020-09-01 2020-09-22 2020-11-05 2020-12-05 2021-01-09 2021-02-23 at project completion. Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Viet Nam: Investing and Innovating for Grassroots Service Delivery Reform PROJECT Procurement Plan (as of February 20, 2019) 1. Project information: Country: Viet Nam Borrower/Recipient: Socialist Republic of Viet Nam Project Name: Investing and Innovating for Grassroots Service Delivery Reform Project Project ID No: P161283 Project Implementing Agency: MoH and participating provinces 2. Bank’s approval date of the Procurement Plan • Original Plan: at project negotiation. • First Revision: … 3. Date of General Procurement Notice: …. 4. Period covered by this procurement plan: the first 18 months implementation I. Works and Goods and Non-Consultant Services: 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Category thresholds Applicable (in US$ Remarks thresholds Remarks equivalent (in US$) ) Works RFB through ≥ 20 million – Above US$ 10 Open million International market approach RFB through ≥ 200,000 – Above US$ 10 Open National < 20 million million market approach Request for < 200,000 – None Quotation Direct None No threshold; Same as for Selection meet competitive requirements selection 1 of regulations 7.13-7.15 Goods and Non-Consulting Services RFB through ≥ 3 million – Above US$ 2 Open million International market approach RFB through ≥ 100,000 - Above US$ 2 Open National < 3 million million market approach Request for < 100,000 None Quotation Direct None No threshold; Same as for Selection meet competitive requirements selection of regulations 7.13-7.15 2. Prequalification. Not expected for the works/goods packages. 3. Any Other Special Procurement Arrangements: National procurement procedures as specified under paragraph 5.4 of the Procurement Regulations and the conditions specified in Annex 1 to this Procurement Plan 4. Leased assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. 5. Procurement of second hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable. 6. Hands-on Expanded Implementation Support (HEIS) as specified under paragraph 3.10 and 3.11 of the Procurement Regulations: Not applicable. 7. Procurement packages for Goods (prior and post reviews) with method and Time Schedule Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Bac Can - construction of CHSs in Lowest Ngoc Phai, W_1_BC 440 RFB Post Q3 2020 National Evaluate Quang Bach d Cost commune (Cho Don District) 2 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Bac Can - Renovation of Lowest W_2_BC 5 CHSs in 286 RFB Post Q2 2020 National Evaluate Ngan Son d Cost District Bac Can - Lowest Renovation of W_3_BC 158 RFQ Post Q3 2020 National Evaluate 3 CHSs in Na d Cost Ri District Ha Giang - construction of CHSs in Lowest W_1_H Ngam La, 704 RFB Post Q3 2020 National Evaluate G Sung Thai d Cost (Yen Minh District) Ha Giang - - Lowest W_2_H Renovation of 440 RFB Post Q2 2020 National Evaluate G 5 CHSs in Meo d Cost Vac District Ha Giang - - Renovation of Lowest W_3_H 3 CHSs in 528 RFB Post Q3 2020 National Evaluate G Quan Ba d Cost District Son La - construction Lowest W_1_SL of 4 CHSs in 880 RFB Post Q2 2020 National Evaluate Thuan Chau d Cost District Son La - construction Lowest W_2_SL of 4 CHSs in 880 RFB Post Q3 2020 National Evaluate Luc Yen d Cost District Yen Bai- construction of CHSs in Lowest Lang Nhi, Ta W_1_YB 540 RFB Post Q3 2020 National Evaluate Xi Lang d Cost communes (Tram Tau District) Yen Bai - Lowest Renovation of W_2_YB 265 RFB Post Q2 2020 National Evaluate 4 CHSs in Yen d Cost Binh District Yen Bai - Lowest Renovation of W_3_YB 735 RFB Post Q3 2020 National Evaluate 4 CHSs in Luc d Cost Yen District 3 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Hoa Binh - construction of CHS in Tan Lowest W_1_HB Son 364 RFB Post Q3 2020 National Evaluate Commune in d Cost Mai Chau District Hoa Binh - Lowest Renovation of W_2_HB 440 RFB Post Q2 2020 National Evaluate 3 CHSs in Mai d Cost Chau District Hoa Binh - Lowest Renovation of W_3_HB 295 RFB Post Q3 2020 National Evaluate 3 CHSs in Da d Cost Bac District Quang Binh - construction of 2 CHSs in Lowest W_1_Q Tan Trach, 140 RFQ Post Q3 2020 National Evaluate B Thuong Trach d Cost communes in Bo Trach District Quang Binh - Renovation of Lowest W_2_Q 4 CHSs in 194 RFQ Post Q2 2020 National Evaluate B Quang Ninh d Cost District Quang Binh - Renovation of Lowest W_3_Q 3 CHSs in 195 RFQ Post Q3 2020 National Evaluate B Quang Trach d Cost District Quang Tri - construction of 2 CHSs in Lowest Cam Tuyen, W_1_QT 300 RFB Post Q3 2020 National Evaluate Cam Chinh d Cost communes in Cam Lo District Quang Tri - Renovation of Lowest W_3_QT 3 CHSs in 466 RFB Post Q2 2020 National Evaluate Vinh Linh d Cost District Quang Ngai - construction Lowest W_1_Q of 3 CHSs in 660 RFB Post Q2 2020 National Evaluate B Binh Son d Cost District 4 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Quang Ngai - Renovation of Lowest W_1_Q 3 CHSs in 352 RFB Post Q2 2020 National Evaluate N Quang Ninh d Cost District Quang Ngai - Lowest W_2_Q Renovation of 264 RFB Post Q3 2020 National Evaluate N 3 CHSs in Tra d Cost Bong District Ninh Thuan - construction of CHS in Lowest W_1_NT Phuong Hai 119 RFQ Post Q3 2020 National Evaluate communes in d Cost Ninh Hai District Ninh Thuan - Renovation of Lowest W_2_NT 4 CHSs in 185 RFQ Post Q2 2020 National Evaluate Thuan Nam d Cost District Bac Lieu - construction of CHS in Lowest Long Dien W_1_BL 264 RFB Post Q3 2020 National Evaluate Dong A d Cost commune in Dong Hai District Bac Lieu - Lowest Renovation of W_2_BL 132 RFQ Post Q2 2021 National Evaluate 2 CHSs in Hoa d Cost Binh District Tra Vinh - construction of 2 CHSs in Lowest W_1_TV Ham Giang, 380 RFB Post Q2 2020 National Evaluate Kim Son d Cost communes in Tra Cu District Tra Vinh - Lowest Renovation of W_2_TV 332 RFB Post Q2 2020 National Evaluate 4 CHSs in Cau d Cost Ngang District Hau Giang - construction Lowest W_1_H of CHS in Mai 704 RFB Post Q3 2020 National Evaluate G Dam town in d Cost Chau Thanh District 5 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Hau Giang - Renovation of Lowest W_2_H 4 CHSs in 372 RFB Post Q2 2020 National Evaluate G Long My d Cost District Long An - construction Lowest W_1_LA of 3 CHSs in 572 RFB Post Q2 2020 National Evaluate Tan Hung d Cost District Long An - Lowest Renovation of W_2_LA 334 RFB Post Q2 2020 National Evaluate 4 CHSs in Moc d Cost Hoa District Long An - Lowest Renovation of W_3_LA 202 RFB Post Q3 2020 National Evaluate 3 CHSs in Ben d Cost Luc District Total Works 12,758 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 GeneXpert equipment Ha Giang - G_1_HG GeneXpert 34.29 DS Post Q3 2020 DS NA equipment Ye Bai - 34.29 G_1_YB GeneXpert DS Post Q3 2020 DS NA equipment Hoa Binh - 68.57 G_1_HB GeneXpert DS Post Q3 2020 DS NA equipment Quang Binh - 102.86 G_1_QB GeneXpert DS Post Q3 2020 DS NA equipment Quang Tri - 102.86 G_1_QT GeneXpert DS Post Q3 2020 DS NA equipment Quang Ngai - 205.71 G_1_QN GeneXpert DS Post Q3 2020 DS NA equipment 6 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 Ninh Thuan - 137.14 G_1_NT GeneXpert DS Post Q3 2020 DS NA equipment Bac Lieu - 102.86 G_1_BL GeneXpert DS Post Q3 2020 DS NA equipment Tra Vinh - 137.14 G_1_TV GeneXpert DS Post Q3 2020 DS NA equipment Hau Giang - G_1_Hu 68.57 GeneXpert DS Post Q3 2020 DS NA G equipment Long An - 205.71 G_1_LA GeneXpert DS Post Q3 2020 DS NA equipment Total GE 1,200 Vaccine Cold Chain equipment Bac Can - 77.89 G_2_BC Vaccine Cold DS Post Q3 2020 DS NA Chain Ha Giang - 168.38 G_2_HG Vaccine Cold DS Post Q3 2020 DS NA Chain Son La - 148.91 G_2_SL Vaccine Cold DS Post Q3 2020 DS NA Chain Yen Bai - 103.09 G_2_YB Vaccine Cold DS Post Q3 2020 DS NA Chain Hoa Binh - 126.00 G_2_HB Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Binh - 68.73 G_2_QB Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Tri - 59.56 G_2_QT Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Ngai - 95.07 G_2_QN Vaccine Cold DS Post Q3 2020 DS NA Chain Ninh Thuan - 27.49 G_2_NT Vaccine Cold DS Post Q3 2020 DS NA Chain Bac Lieu - 27.49 G_2_BL Vaccine Cold DS Post Q3 2020 DS NA Chain Tra Vinh - 45.82 G_2_TV Vaccine Cold DS Post Q3 2020 DS NA Chain 7 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 Hau Giang - G_2_Hu 13.75 Vaccine Cold DS Post Q3 2020 DS NA G Chain Long An - 37.80 G_2_LA Vaccine Cold DS Post Q3 2020 DS NA Chain Total VCC 1,000 DS Post Q3 2020 DS NA Total Works and 14,958 Goods 8 II. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Category Applicable thresholds thresholds (in US$ Remarks Remarks (in US$, equivalent millions) ) QCBS, QBS, ≥ 300,000 Shortlist of only ≥ 1.0 million FBS, LCS National (Using the Consultants most (Firms) for appropriate contract agreed market in the PP approach) CQS (Open or < 300,000 QCBS, QBS, FBS, None limited LCS) can be competition applied for through contracts with national or value under international $300,000 market approach, specified in the PP and agreed with the Bank. Direct None No threshold; Same as for Selection of meet competitive firms requirements of selection regulations 7.13- 7.15 Individual N/A Essential ≥ 300,000 depending individual and for the Consultants on nature of assignments will positions as services be defined in the specified in Procurement the PP agreed Plan agreed with with the Bank the Bank and in line with regulations 7.34- 7.39 using the most appropriate market approach 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 500,000 equivalent per contract, may comprise entirely of national consultants in 9 accordance with the provisions of paragraph 7.1, Section VII of the Procurement Regulations. 3. Consultancy Assignments with Selection Methods and Time Schedule Consulting Services Expecte Estimate Selecti d Revie Market Ref. Description of d Cost on Proposa Remar w by approa No. Assignment (US$ Metho l k Bank ch 1000) d Submiss ion Time B. Component 2 Post Training need assessment, development 12 and revisions of C_2b_ Nationa months professional 24 IC Post Q1 2020 1 l in 3 and years management training material C_2b_ IEC and Health Nationa 200 CQS Post Q1 2020 1 promotion l Development of the Balanced 6 C_2c_ Score cards - Nationa months 12 IC Post Q1 2020 1 health l in 1 system/public year health expert Development of 6 C_2c_ the Balanced Nationa months 12 IC Post Q1 2020 2 Score cards - l in 1 clinical expert year C. Component 3 Development of decree on functions and responsibilities of District 5 man- C_3a_ Health Center Nationa months 25 CQS/IC Post Q2 2020 1 (that cover l in a Regional clinic year and CHS) for primary health care at grassroot level Evidence for tracer conditions in the project to 5 man- C_3a_ provide inputs Nationa months 25 CQS/IC Post Q2 2020 2 for l in a development of year guidelines for Primary Healthcare at 10 commune level (to replace Decision 2919/QD-BYT International Experience on e-learning for continuous training, to 3 man- C_3a_ provide inputs Nationa months 15 CQS/IC Post Q3 2020 3 for the l in 6 development of months new decree replacing decree 22/2013/TT-BYT Development and supervision of the implementation 36 of electronic man- C_3b_ health record Nationa 500 QCBS Post Q3 2020 month 1 module at l in 5 commune level years (trans district- commune), balanced score card software Design and pilot C_3b_ implementation Nationa 25 CQS/IC Post Q2 2021 2 of community l health screening Design and C_3b_ implementation Nationa 6 25 CQS/IC Post Q4 2020 3 of tools for l months clinical decision C_3b_ Nationa 6 Quality service 25 CQS/IC Post Q2 2021 4 l months C_3d_ Auditing Nationa 50 CQS Post Q2 2021 1 Service l C_3d_ Nationa Coordinator 36 IC Post Q1 2020 2 l C_3d_ Nationa Planning Expert 27 IC Post Q1 2021 3 l C_3d_ Disbursement Nationa 27 IC Post Q1 2022 4 Expert l C_3d_ Nationa FM expert 27 IC Post Q1 2023 5 l C_3d_ Procurement Nationa 27 IC Post Q1 2024 6 Expert l Total consulting services 1,082 Total Works, Goods and Consulting 16,040 Services 11 12 Annex 1 - Additional National Procurement Provisions. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 1. Open Competitive Procurement: When the Recipient uses its own national open competitive procurement arrangements as set forth in (a) Article 20 on Open Bidding of the Recipient’s Law on Procurement No. 43/2013/QH13 dated November 26, 2013 and related provisions necessary to effect the same; and (b) the Recipient’s Decree No. 63/2014/ND-CP dated June 26, 2014 Guiding Implementation of the Law on the Procurement (collectively, “National Procurement Laws”), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (i) No domestic preference over foreign bidders shall be granted to national bidders in bid evaluation, nor shall foreign bidders be asked or required to form joint ventures with or be subcontractors to national bidders in order to submit a bid. (ii) The model bidding documents (harmonized model bidding documents) agreed with the Association shall be used. (iii) No bid shall be eliminated from detailed evaluation on the basis of minor, non-substantive deviations. The evaluation of bidder’s qualifications shall be conducted separately subsequent to the technical and commercial evaluation of the bid. (iv) A bidder shall neither be required nor permitted, as a condition for award, to undertake obligations not specified in the bidding documents or otherwise to modify the bid as originally submitted. (v) No bid shall be rejected on the basis of a comparison with the employer’s estimate and budget ceiling. (vi) The Recipient shall implement an effective mechanism allowing bidders to complaint and have their complaints handled in a timely manner. The complaints mechanism shall allow the submission of anonymous complaints. 13 PROCUREMENT Vietnam : Investing and Innovating for Grassroots Health Service Delivery PLAN General Information Country: Vietnam Bank’s Approval Date of the Original Procurement Plan: 2021-05-26 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161283 GPN Date: 2020-09-14 Project Name: Investing and Innovating for Grassroots Health Service Delivery Loan / Credit No: IDA / 64390 Y Executing Agency(ies): en Bai Provincial Project Management Unit for GSD WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National YB-C1-XL 01 / Improving Procurement Pending and upgrading commune Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 242,838.50 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 health satation Ban Cong and CHS Infrastructure Envelope 15 Envelope process ion Xa Ho, Tram Tau district (Non Bank-SPD) National YB-C1-XL 03 / Improving Procurement Pending and upgrading commune Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 216,697.59 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 health satation Cao Pha and CHS Infrastructure Envelope 15 Envelope process ion Nam Co, Mu Cang Chai (Non Bank-SPD) district YB-C1-XL 02 / Improving an National d upgrading commune health Procurement Pending Component 1: Upgrading of Single Stage - One 2022-04- satation Ban Mu, Trạm Tau an IDA / 64390 Post Request for Bids Open - National Document - 1 289,405.45 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 CHS Infrastructure Envelope 15 d Tram Tau town, Tram Tau di Envelope process ion strict (Non Bank-SPD) National YB-C1-XL 04 / Improving Procurement Pending and upgrading commune Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 346,854.49 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 health satation Ho Bon and CHS Infrastructure Envelope 15 Envelope process ion Khao Mang, Mu Cang Chai (Non Bank-SPD) district National YB-C1-XL 05 / Improving Procurement Pending and upgrading commune Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 197,837.18 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 health satation Kim Noi and CHS Infrastructure Envelope 15 Envelope process ion Nam Khat, Mu Cang Chai (Non Bank-SPD) district YB-C1-XL 06 / Improving National and upgrading commune Procurement Pending Component 1: Upgrading of Single Stage - One 2022-04- health satation Tuc Dan, Tram IDA / 64390 Post Request for Bids Open - National Document - 1 211,586.01 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 CHS Infrastructure Envelope 15 Tau district and Pu Trang, Envelope process ion Nghia Lo town (Non Bank-SPD) National YB-C1-XL 07 / Improving Procurement Pending and upgrading commune Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 234,780.84 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 health satation Nghia Tam CHS Infrastructure Envelope 15 Envelope process ion and Binh Thuan, Van Chan (Non Bank-SPD) district YB-C1-XL 08 / Improving National and upgrading commune Procurement Pending Component 1: Upgrading of Single Stage - One 2022-04- health satation Nam Muoi, IDA / 64390 Post Request for Bids Open - National Document - 1 319,391.83 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 CHS Infrastructure Envelope 15 Nam Lanh and Minh An, Van Envelope process ion Chan district (Non Bank-SPD) YB-C1-XL 09 / Improving National and upgrading commune Procurement Pending health satation Minh Quan Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 251,412.07 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 and Tan Dong, Tran Yen CHS Infrastructure Envelope 15 Envelope process ion district and Lien Son farm (Non Bank-SPD) town, Van Chan district YB-C1-XL 10 / Improving National and upgrading commune Procurement Pending Component 1: Upgrading of Single Stage - One 2022-04- health satation An Lac, Khanh IDA / 64390 Post Request for Bids Open - National Document - 1 367,540.36 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 CHS Infrastructure Envelope 15 Thien, Tan Phuong and Minh Envelope process ion Chuan, Luc Yen district (Non Bank-SPD) YB-C1-XL 11 / Improving National and upgrading commune Procurement Pending Component 1: Upgrading of Single Stage - One 2022-04- health satation Quang Minh, IDA / 64390 Post Request for Bids Open - National Document - 1 250,813.61 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 CHS Infrastructure Envelope 15 Lang Thip and Na Hau, Van Envelope process ion Yen district (Non Bank-SPD) YB-C1-XL 12 / Improving National and upgrading commune Procurement Pending Component 1: Upgrading of Single Stage - One 2022-04- health satation Phong Du IDA / 64390 Post Request for Bids Open - National Document - 1 227,599.84 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 CHS Infrastructure Envelope 15 Thuong and Xuan Tam, Van Envelope process ion Yen district (Non Bank-SPD) National YB-C1-XL 13 / Improving Procurement Pending and upgrading commune Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 217,379.18 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 health satation Xuan Lai and CHS Infrastructure Envelope 15 Envelope process ion Mong Son, Yen Binh district (Non Bank-SPD) National YB-C1-XL 14 / Improving Procurement Pending and upgrading commune Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 235,008.65 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 health satation Yen Thanh and CHS Infrastructure Envelope 15 Envelope process ion Vinh Kien, Yen Binh district (Non Bank-SPD) YB-C1-XL 15 / Improving National and upgrading commune Procurement Pending Component 1: Upgrading of Single Stage - One 2022-04- health satation Ngoc Chan, IDA / 64390 Post Request for Bids Open - National Document - 1 244,321.80 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 CHS Infrastructure Envelope 15 Dai Minh and Tan Nguyen, Envelope process ion Yen Binh district (Non Bank-SPD) National YB-C1-XL 16 / New Procurement Pending contruction of health station Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 225,253.69 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 Nghia Phuc, Nghia Lo town CHS Infrastructure Envelope 15 Envelope process ion and Tan Hop, Van Yen district (Non Bank-SPD) National YB-C1-XL 17 / New Procurement Pending contruction of health station Component 1: Upgrading of Single Stage - One 2022-04- IDA / 64390 Post Request for Bids Open - National Document - 1 268,118.78 0.00 Implementat 2021-06-15 2021-06-20 2021-07-20 2021-08-04 2021-08-18 Ngoi A and Mau A town, Van CHS Infrastructure Envelope 15 Envelope process ion Yen district (Non Bank-SPD) Page 1 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN Project information: India COVID-19 Emergency Response and Health Systems Preparedness Project Project Implementation agency: National Health Mission (NHM), the National Center for Disease Control (NCDC) and the Indian Council of Medical Research (ICMR) – all under Ministry of Health & Family Welfare (MOHFW), Government of India. Some components of the Project will also be implemented by States and district hospitals/other hospitals and medical colleges under NHM. Procurement Agent or Specialized Government Procurement Agencies may be used to augment capacity of implementing agencies. Date of the Procurement Plan: 20 MARCH 2020 Period covered by this Procurement Plan: 01 April 2020 to 30 June 2020 Preamble Project Implementation Manual (PIM): PIM will have a chapter on Procurement based on following details. Procurement Arrangement for Component 1: Emergency COVID-19 Response Procurement can be undertaken using Borrowers’ own procedures for the first two years of project implementation, provided these comply with Bank’s Anti-Corruption Guidelines and subject to post review by the Bank. This arrangement may extend beyond the two years subject to an assessment of the need and agreement of the Bank. If there is no extension of this arrangement, procedures described under below paras will also apply to this component after first 2 years Procurement Arrangement for Remaining Components Procurement for remaining components under the project will be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers for Goods, Works, Non-Consulting and Consulting Services, dated July 1, 2016 (revised in November 2017 and August 2018). Procurement under the Project will also be subject to the World Bank’s Anticorruption Guidelines, dated October 15, 2006, revised in January 2011, and as of July 1, 2016. Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: National competition for the procurement of goods, works and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3 – 5.6 of Section V of the Regulations and the following provisions: a. Only the model bidding documents for National Competitive Procurement agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding. b. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. c. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprises from any given State. d. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. e. GeM set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations1 method. f. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. g. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. h. The Request for Bids/Request for Proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. j. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety risks and impacts. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). 1 To the extent possible, competitive bidding/e-RA options will be used while using GeM Goods: will be applicable for those contracts identified in the Procurement Plan table; Works: Not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations as well as Bank facilitating procurement (BFP)2 are available and can be used (after necessary letters are exchanged in requisite format), if desired by implementing agencies. Other Relevant Procurement Information. Review Type: Since this is an emergency response project there will be no prior review of any package during emergency period. However, after emergency is over, considering the risk as “Substantial”, the “Prior review” shall be governed by the below table: Category of Market approach Prior review procurement Works Above US$40 M for threshold All > US$10 M contracts (US$m) threshold ICP Upto US$40 M for NCP Upto US$1 M for RFQ Goods, IT Systems Above US$25 M for All contracts > US$2 M and Non-Consultancy ICP Upto US$25 M services for NCP Upto US$1 m for RFQ Consultancy Services US$ 0.8 M for NPP All contracts > US$ 1 M (with option for direct RFP) Above US$0.8 M-Other methods Note: Direct contracting/single source prior review will follow the requirements of the category of procurement (goods, works and services). Higher method thresholds (US$ 25M for Goods NCP and US$ 1 M for RFQ) are applicable only for emergency response period, normal threshold (US$ 10M for Goods NCP and US$ 100,000 for RFQ) will be used thereafter. 2 Upon the request of some of the member countries, the Bank has agreed to augment its hands-on support to proactively assist the implementing agency(ies) in accessing existing supply chains for the agreed list of critical medical consumables and equipment needed under the project. Once the suppliers are identified, the Bank will proactively support borrowers with negotiating prices and other contract conditions. The Borrowers will remain fully responsible for signing and entering into contracts and implementation, including assuring relevant logistics with suppliers such as arranging the necessary freight/shipment of the goods to their destination, receiving and inspecting the goods and paying the suppliers, with the direct payment by the Bank disbursement option available to them. If needed, the Bank may also provide hands-on support to the implementing agency(ies) in contracting to outsource logistics. The Bank's hand-on support in accessing available supplies may include aggregating demand across participating countries, whenever possible, extensive market engagement to identify suppliers from the private sector, and accessing governments' and UN Agencies' stock, as applicable. The Bank is coordinating closely with the WHO and other UN agencies. For remaining contracts (including those issued during advance contracting/retroactive financing period and emergency period), Bank will conduct post review. Other flexible approaches such as direct selection, extension of existing contracts, use of UN Agencies, shorter bidding period, use of Framework Agreements etc. could be used as agreed in Procurement Plan table in STEP. Contracts issued under Advance Contracting/Retroactive Financing: Contracts that were procured in advance of the signing of the Financing Agreement [and are included in the Procurement Plan] will be eligible for the Bank’s retroactive financing if the contractor has explicitly agreed to comply with the relevant provisions of the Bank’s Anti-Corruption Guidelines, including the Bank’s right to inspect and audit all accounts, records, and other documents relating to the Project that are required to be maintained pursuant to the Financing Agreement. Procurement Package planned for first three months : ICMR Description Procurem ent Procurem ent Estimated Amount US$ Bank Financed % Review Type Duration of Planned Start Date Category Method/ Market assignm ents in (Must be in YYYY/MM/DD format) approach months Preparatory actions will be taken for building a network of BSL- CS Direct 100 Post 2 3 Labs and upgradtion of following five existing 5 Viral Research & Diagnostic Laboratories to enhance capacity for 133,333 2020.04.15 testing of samples for Coronovirus (COVID-19) and other em erging and novel viruses: Kasturba Hospital Preparatory Infectious for setting action for Diseases, up of Mum one Mobile bai, BSL-3 CS QCBS 100 Post 6 Laboratory for collection and testing of sam ples in remote and unserved areas/regions 66,667 2020.04.15 3)Support for the Regional Research Platform of the WHO- Works RFB(NCB)/Direct 100 Post 2 South East Asia Region Countries for research and surveillance (TBD) activities 3,407,407 2020.04.15 Purchase of three Fast Real-Time PCR for testing of Goods RFB 100 Post 2 Coronavirus and other em erging and novel viruses 2,074,074 2020.04.15 Identification of Project Managem ent and Im plementation Units CS QBS/QCBS 100 Post 6 (PMIU) and hiring of procurem ent consultants 666,667 2020.04.15 Research grant to National Institute Virology (NIV), Pune, Viral CS Direct 100 Post 60 Research & Diagnostic Laboratories (VRDLs) and Model Rural Health Research Units (MRHRUs) for undertaking 1,333,333 As soon as possible. epidem iological and surveillance based studies Grand Total 7,681,481 COVID HEIS BFP Letter Format [Date], 2020 Excellency, We refer to [negotiations [underway][completed] for a Loan Agreement [to be entered into] [the Financing Agreement of today’s date] between [India] and the [International Bank of Reconstruction and Development] (Bank) for the India: COVID-19 Emergency Response and Health Systems Preparedness Project . We are pleased to notify you that the Bank approves your request for Hands-on Expanded Implementation Support (HEIS) under the Bank’s procurement framework to support [ ] [in its role as Project Implementation Unit] in the context of the procurement of [describe procurement activity ]. The Bank will provide HEIS to [Implementing Entity] in a manner consistent with its operational policies and procedures. Given the significant disruptions in the usual supply chains for medical consumables and equipment for the COVID-19 response, the Bank, at your request, may also provide proactive assistance in accessing existing supply chains through Bank Facilitated Procurement (BFP) under HEIS. In particular, the Bank may provide the following support: BFP activities under HEIS: 1. Conduct extensive market engagement and survey to identify available stock of the agreed list of critical medical consumables and equipment needed under this COVID19 response project (attached) in the quantities therein specified; 2. Assist [the Implementing Entity] in (i) negotiating prices, delivery terms, and other contract conditions with identified suppliers; 3. Draft final award letters and/or contracts adapted to specific market conditions, on a fit-for-purpose basis and ensuring consistency with Bank’s procurement framework; 4. Provide additional hands-on support in contracting to outsource logistics. Other HEIS activities: 5. Draft technical requirements and specifications, as requested by the [Implementing Entity; 6. Assist [the Implementing Entity] in drafting procurement documents; and 7. Provide advice on evaluation procedures, participate as observers during negotiations, by only clarifying matters of the Bank Procurement Regulations. The Bank will be providing BFP under HEIS to other client countries to aggregate demand for medical supplies across countries, whenever possible, and will conduct extensive market engagement to identify suppliers from the private sector, and to facilitate access to governments’ and UN Agencies’ stock. While the Bank will facilitate access and coordinate closely with your government, full decision-making responsibility at every stage of the procurement process will rest with your government. In addition, you will be responsible for signing and implementing the contracts, including establishing relevant logistics with suppliers such as arranging the necessary freight/shipment of the goods to their destination, as well as receiving and inspecting the goods. It is understood that the Bank will not be liable for any claims or demands from third parties or from your government related to any defect in quality or quantity of any goods, [works or services] to be procured by [India ] with support under the HEIS, the shipment or use of any goods, or otherwise. Once the Loan Agreement is declared effective by the Bank, we may make payments on your behalf to the [contractors,] suppliers [or consultants] through the Bank’s system of making Direct Payments from the proceeds of the financing, in accordance with the terms of the Loan Agreement. Kindly countersign and return this letter agreement to us. We look forward to working with you to address this global emergency. Sincerely, Countersigned by: INDIA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By By _____________________________________ _____________________________________/s2/ Authorized Representative Authorized Representative Name: Name: __________________________/n2/ __________________________/n1/ Title: __________________________/t2/ Title: __________________________/t1/ Date: __________________________/d2/ Date: __________________________ cc: PROCUREMENT India : India COVID-19 Emergency Response and Health Systems Preparedness Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2020-06-12 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173836 GPN Date: Project Name: India COVID-19 Emergency Response and Health Systems Preparedness Project Loan / Credit No: COFN / C1660 Ministry of Health and Family Welfare, Government of India Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Emergency G - 1 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 88,216.03 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 2 / Coveralls COFN / C1660 Post Direct Selection Direct 755,650.00 749,836.22 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 3 / Coveralls COFN / C1660 Post Direct Selection Direct 7,289,800.00 7,233,714.11 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 4 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 88,216.03 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 5 / Coveralls COFN / C1660 Post Direct Selection Direct 1,066,800.00 1,058,592.31 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 6 / Coveralls COFN / C1660 Post Direct Selection Direct 8,890,000.00 8,819,675.65 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 7 / Coveralls COFN / C1660 Post Direct Selection Direct 17,780,000.00 13,714,595.65 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 8 / Coveralls COFN / C1660 Post Direct Selection Direct 5,511,800.00 2,917,979.71 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 9 / Coveralls COFN / C1660 Post Direct Selection Direct 889,000.00 881,967.57 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 10 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 88,196.76 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 11 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 132,295.13 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 12 / Coveralls COFN / C1660 Post Direct Selection Direct 2,489,200.00 2,469,509.18 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 13 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 220,491.89 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 14 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 88,196.76 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 15 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 440,983.78 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 16 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 88,196.76 Signed 2020-06-21 2020-06-20 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 17 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 132,295.13 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 18 / Coveralls COFN / C1660 Post Direct Selection Direct 711,200.00 1,322,951.34 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 19 / Coveralls COFN / C1660 Post Direct Selection Direct 889,000.00 881,967.57 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 20 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 264,590.27 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 21 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 440,983.78 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 22 / Coveralls COFN / C1660 Post Direct Selection Direct 8,890.00 8,819.67 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 23 / Coveralls COFN / C1660 Post Direct Selection Direct 1,244,600.00 1,234,754.60 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 24 / Coveralls COFN / C1660 Post Direct Selection Direct 2,000,250.00 1,984,427.02 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 25 / Coveralls COFN / C1660 Post Direct Selection Direct 4,933,950.00 4,894,919.99 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Page 1 Component 1: Emergency G - 26 / Coveralls COFN / C1660 Post Direct Selection Direct 3,885,000.00 3,854,267.71 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 27 / Coveralls COFN / C1660 Post Direct Selection Direct 2,667,000.00 2,645,902.70 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 28 / Coveralls COFN / C1660 Post Direct Selection Direct 533,400.00 529,180.54 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 29 / Coveralls COFN / C1660 Post Direct Selection Direct 294,000.00 291,674.31 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 30 / Coveralls COFN / C1660 Post Direct Selection Direct 25,559.00 25,356.56 Signed 2020-06-21 2020-06-25 2020-06-26 2020-06-25 2020-07-31 2020-06-25 2021-01-27 COVID-19 Response Component 1: Emergency G - 31 / Coveralls COFN / C1660 Post Direct Selection Direct 1,155,700.00 1,146,557.83 Signed 2020-06-21 2020-06-25 2020-06-26 2020-06-25 2020-07-31 2020-06-25 2021-01-27 COVID-19 Response Component 1: Emergency G - 32 / Coveralls COFN / C1660 Post Direct Selection Direct 440,855.00 437,367.71 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 33 / Coveralls COFN / C1660 Post Direct Selection Direct 1,733,550.00 1,719,836.75 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 34 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 440,983.78 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 35 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 440,983.78 Signed 2020-06-21 2020-06-25 2020-06-26 2020-06-25 2020-07-31 2020-06-25 2021-01-27 COVID-19 Response Component 1: Emergency G - 36 / Coveralls COFN / C1660 Post Direct Selection Direct 10,586,240.00 10,502,497.55 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 37 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 308,688.65 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 38 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 88,196.75 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 39 / Coveralls COFN / C1660 Post Direct Selection Direct 1,911,350.00 1,896,230.27 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 40 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 88,196.75 Signed 2020-06-21 2020-06-26 2020-06-26 2020-06-26 2020-07-31 2020-06-26 2021-01-27 COVID-19 Response Component 1: Emergency G - 41 / Coverall COFN / C1660 Post Direct Selection Direct 88,900.00 88,196.76 Signed 2020-06-21 2020-06-26 2020-06-26 2020-06-26 2020-07-31 2020-06-26 2021-01-27 COVID-19 Response Component 1: Emergency G - 42 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 2,116,722.15 Signed 2020-06-21 2020-06-26 2020-06-26 2020-06-26 2020-07-31 2020-06-26 2021-01-27 COVID-19 Response Component 1: Emergency G - 43 / Coveralls COFN / C1660 Post Direct Selection Direct 1,554,000.00 1,541,707.09 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 44 / coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 264,973.11 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 45 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 441,621.86 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 46 / Coveralls COFN / C1660 Post Direct Selection Direct 99,328.00 228,548.56 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 47 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 88,324.37 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 48 / Coveralls COFN / C1660 Post Direct Selection Direct 2,933,700.00 2,914,704.30 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 49 / Coveralls COFN / C1660 Post Direct Selection Direct 266,700.00 264,973.12 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 50 / Coveralls COFN / C1660 Post Direct Selection Direct 889,000.00 883,243.73 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 51 / Coveralls COFN / C1660 Post Direct Selection Direct 1,778,000.00 1,766,487.45 Signed 2020-06-21 2020-06-26 2020-06-26 2020-06-26 2020-07-31 2020-06-26 2021-01-27 COVID-19 Response Component 1: Emergency G - 52 / Coveralls COFN / C1660 Post Direct Selection Direct 889,000.00 883,243.73 Signed 2020-06-21 2020-06-26 2020-06-26 2020-06-26 2020-07-31 2020-06-26 2021-01-27 COVID-19 Response Component 1: Emergency G - 53 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 441,621.86 Signed 2020-06-21 2020-06-25 2020-06-26 2020-06-25 2020-07-31 2020-06-25 2021-01-27 COVID-19 Response Component 1: Emergency G - 54 / Coveralls COFN / C1660 Post Direct Selection Direct 266,700.00 69,446.54 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 55 / Coveralls COFN / C1660 Post Direct Selection Direct 266,700.00 264,973.12 Signed 2020-06-21 2020-06-25 2020-06-26 2020-06-25 2020-07-31 2020-06-25 2021-01-27 COVID-19 Response Component 1: Emergency G - 56 / Coveralls COFN / C1660 Post Direct Selection Direct 266,700.00 264,973.12 Signed 2020-06-21 2020-06-25 2020-06-26 2020-06-25 2020-07-31 2020-06-25 2021-01-27 COVID-19 Response Component 1: Emergency G - 57 / Coveralls COFN / C1660 Post Direct Selection Direct 177,800.00 176,648.75 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 58 / Coveralls COFN / C1660 Post Direct Selection Direct 889,000.00 883,243.73 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Page 2 Component 1: Emergency G - 59 / Coveralls COFN / C1660 Post Direct Selection Direct 2,178,050.00 2,163,947.13 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 60 / Coveralls COFN / C1660 Post Direct Selection Direct 4,445,000.00 1,369,027.77 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 61 / Coveralls COFN / C1660 Post Direct Selection Direct 2,444,750.00 2,428,920.24 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 62 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 264,973.12 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 63 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 529,946.23 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 64 / Coverall COFN / C1660 Post Direct Selection Direct 4,311,650.00 4,283,732.07 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 65 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 1,148,216.84 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 66 / Coveralls COFN / C1660 Post Direct Selection Direct 889,000.00 883,243.73 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 67 / Coveralls COFN / C1660 Post Direct Selection Direct 4,044,950.00 4,018,758.95 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 68 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 132,486.56 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 69 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 441,621.86 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 70 / Coveralls COFN / C1660 Post Direct Selection Direct 6,489,700.00 6,447,679.20 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 71 / Coveralls COFN / C1660 Post Direct Selection Direct 2,489,200.00 2,473,082.44 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 72 / Coveralls COFN / C1660 Post Direct Selection Direct 3,022,600.00 3,003,028.67 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 73 / Coveralls COFN / C1660 Post Direct Selection Direct 2,489,200.00 2,031,460.57 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 74 / Coveralls COFN / C1660 Post Direct Selection Direct 248,920.00 268,254.31 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 75 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 194,313.62 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 76 / Coveralls COFN / C1660 Post Direct Selection Direct 7,067,550.00 7,021,787.61 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 77 / Coveralls COFN / C1660 Post Direct Selection Direct 3,333,750.00 3,312,163.97 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 78 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 706,515.50 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 79 / Coveralls COFN / C1660 Post Direct Selection Direct 800,100.00 7,147,117.28 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response Component 1: Emergency G - 80 / Coveralls COFN / C1660 Post Direct Selection Direct 1,612,054.00 1,659,819.97 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 81 / Coveralls COFN / C1660 Post Direct Selection Direct 889,000.00 1,324,865.59 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 82 / Coveralls COFN / C1660 Post Direct Selection Direct 1,244,600.00 1,236,541.21 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 83 / Coveralls COFN / C1660 Post Direct Selection Direct 88,900.00 88,324.37 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 84 / Coveralls COFN / C1660 Post Direct Selection Direct 533,400.00 529,946.23 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 85 / Coveralls COFN / C1660 Post Direct Selection Direct 889,000.00 883,243.73 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 86 / Coveralls COFN / C1660 Post Direct Selection Direct 1,778,000.00 446,694.83 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 87 / Coveralls COFN / C1660 Post Direct Selection Direct 2,133,600.00 4,107,083.32 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 88 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 971,568.10 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 89 / Coveralls COFN / C1660 Post Direct Selection Direct 533,400.00 529,946.23 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response Component 1: Emergency G - 90 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 264,597.27 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 91 / Coveralls COFN / C1660 Post Direct Selection Direct 1,422,400.00 1,411,185.44 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Page 3 Component 1: Emergency G - 92 / Coveralls COFN / C1660 Post Direct Selection Direct 488,950.00 499,351.31 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 93 / Coveralls COFN / C1660 Post Direct Selection Direct 444,500.00 440,995.45 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 94 / Coveralls COFN / C1660 Post Direct Selection Direct 89,900.00 625,365.30 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 95 / Goggles COFN / C1660 Post Direct Selection Direct 424,800.00 411,081.63 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 96 / Goggles COFN / C1660 Post Direct Selection Direct 377,600.00 379,459.96 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 97 / Goggles COFN / C1660 Post Direct Selection Direct 283,200.00 284,594.97 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 98 / Goggles COFN / C1660 Post Direct Selection Direct 188,800.00 189,729.99 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 99 / Goggles COFN / C1660 Post Direct Selection Direct 1,888,000.00 385,360.25 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 100 / Goggles COFN / C1660 Post Direct Selection Direct 212,400.00 213,446.23 Signed 2020-06-21 2020-06-25 2020-06-26 2020-06-25 2020-07-31 2020-06-25 2021-01-27 COVID-19 Response Component 1: Emergency G - 101 / Goggles COFN / C1660 Post Direct Selection Direct 684,400.00 687,771.18 Signed 2020-06-21 2020-06-24 2020-06-26 2020-06-24 2020-07-31 2020-06-24 2021-01-27 COVID-19 Response Component 1: Emergency G - 102 / Goggles COFN / C1660 Post Direct Selection Direct 3,540,000.00 3,557,437.16 Signed 2020-06-21 2020-06-23 2020-06-26 2020-06-23 2020-07-31 2020-06-23 2021-01-27 COVID-19 Response Component 1: Emergency G - 103 / Goggles COFN / C1660 Post Direct Selection Direct 944,000.00 948,649.91 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 104 / Goggles COFN / C1660 Post Direct Selection Direct 944,000.00 948,649.91 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 105 / Goggles COFN / C1660 Post Direct Selection Direct 188,800.00 189,729.98 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 106 / Goggles COFN / C1660 Post Direct Selection Direct 3,056,515.00 3,071,570.29 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 107 / Goggles COFN / C1660 Post Direct Selection Direct 1,416,000.00 1,415,877.52 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 108 / Goggles COFN / C1660 Post Direct Selection Direct 755,200.00 755,134.68 Signed 2020-06-21 2020-06-17 2020-06-26 2020-06-17 2020-07-31 2020-06-17 2021-01-27 COVID-19 Response Component 1: Emergency G - 109 / Goggles COFN / C1660 Post Direct Selection Direct 944,000.00 943,918.34 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 110 / Goggles COFN / C1660 Post Direct Selection Direct 70,800.00 70,793.88 Signed 2020-06-21 2020-06-14 2020-06-26 2020-06-14 2020-07-31 2020-06-14 2021-01-27 COVID-19 Response Component 1: Emergency G - 111 / Goggles COFN / C1660 Post Direct Selection Direct 13,876,800.00 13,875,599.66 Signed 2020-06-21 2020-06-14 2020-06-26 2020-06-14 2020-07-31 2020-06-14 2021-01-27 COVID-19 Response Component 1: Emergency G - 112 / Goggles COFN / C1660 Post Direct Selection Direct 29,264.00 29,261.47 Terminated 2020-06-21 2020-06-14 2020-06-26 2020-06-14 2020-07-31 2020-06-14 2021-01-27 COVID-19 Response Component 1: Emergency G - 113 / Goggles COFN / C1660 Post Direct Selection Direct 275,334.00 275,309.52 Signed 2020-06-21 2020-06-14 2020-06-26 2020-06-14 2020-07-31 2020-06-14 2021-01-27 COVID-19 Response Component 1: Emergency G - 114 / Goggles COFN / C1660 Post Direct Selection Direct 377,600.00 377,567.34 Signed 2020-06-21 2020-06-14 2020-06-26 2020-06-14 2020-07-31 2020-06-14 2021-01-27 COVID-19 Response Component 1: Emergency G - 115 / Goggles COFN / C1660 Post Direct Selection Direct 723,734.00 723,670.73 Signed 2020-06-21 2020-06-14 2020-06-26 2020-06-14 2020-07-31 2020-06-14 2021-01-27 COVID-19 Response Component 1: Emergency G - 116 / Goggles COFN / C1660 Post Direct Selection Direct 377,600.00 377,567.34 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response Component 1: Emergency G - 117 / Goggles COFN / C1660 Post Direct Selection Direct 1,378,240.00 84,952.65 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response Component 1: Emergency G - 118 / Goggles COFN / C1660 Post Direct Selection Direct 566,400.00 566,351.01 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response Component 1: Emergency G - 119 / Goggles COFN / C1660 Post Direct Selection Direct 377,600.00 377,567.34 Signed 2020-06-21 2020-06-14 2020-06-26 2020-06-14 2020-07-31 2020-06-14 2021-01-27 COVID-19 Response Component 1: Emergency G - 120 / Goggles COFN / C1660 Post Direct Selection Direct 196,667.00 196,649.66 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 121 / Goggles COFN / C1660 Post Direct Selection Direct 188,800.00 188,783.67 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 122 / Goggles COFN / C1660 Post Direct Selection Direct 166,774.00 170,651.90 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 123 / N 95 Mask COFN / C1660 Post Direct Selection Direct 571,200.00 571,150.59 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response Component 1: Emergency G - 124 / N 95 Masks COFN / C1660 Post Direct Selection Direct 350,000.00 349,969.73 Signed 2020-06-21 2020-06-14 2020-06-26 2020-06-14 2020-07-31 2020-06-14 2021-01-27 COVID-19 Response Page 4 Component 1: Emergency G - 126 / N 95 Masks COFN / C1660 Post Direct Selection Direct 220,500.00 220,480.93 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 127 / N 95 Masks COFN / C1660 Post Direct Selection Direct 1,610,000.00 1,609,706.18 Signed 2020-06-21 2020-06-16 2020-06-26 2020-06-16 2020-07-31 2020-06-16 2021-01-27 COVID-19 Response Component 1: Emergency G - 128 / N 95 Masks COFN / C1660 Post Direct Selection Direct 80,491.00 80,475.98 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response Component 1: Emergency G - 129 / N 95 Masks COFN / C1660 Post Direct Selection Direct 147,840.00 148,262.08 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 130 / N 95 Masks COFN / C1660 Post Direct Selection Direct 1,050,000.00 1,052,997.75 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 131 / N 95 Masks COFN / C1660 Post Direct Selection Direct 10,120,000.00 11,165,119.00 Signed 2020-06-21 2020-06-19 2020-06-26 2020-06-19 2020-07-31 2020-06-19 2021-01-27 COVID-19 Response Component 1: Emergency G - 132 / Gloves COFN / C1660 Post Direct Selection Direct 597,334.00 599,038.72 Signed 2020-06-21 2020-06-22 2020-06-26 2020-06-22 2020-07-31 2020-06-22 2021-01-27 COVID-19 Response Component 1: Emergency G - 133 / Gloves COFN / C1660 Post Direct Selection Direct 8,930.00 4,477.81 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 134 / Gloves COFN / C1660 Post Direct Selection Direct 298,667.00 1,123,197.60 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 135 / Gloves COFN / C1660 Post Direct Selection Direct 179,200.00 179,711.62 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response Component 1: Emergency G - 136 / Gloves COFN / C1660 Post Direct Selection Direct 298,667.00 29,951.94 Signed 2020-06-21 2020-06-18 2020-06-26 2020-06-18 2020-07-31 2020-06-18 2021-01-27 COVID-19 Response Component 1: Emergency G - 137 / Gloves COFN / C1660 Post Direct Selection Direct 657,067.00 33,918.96 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 138 / Gloves COFN / C1660 Post Direct Selection Direct 2,534.00 20,057.10 Signed 2020-06-21 2020-06-21 2020-06-26 2020-06-21 2020-07-31 2020-06-21 2021-01-27 COVID-19 Response Component 1: Emergency G - 125 / N 95 Masks COFN / C1660 Post Direct Selection Direct 700,000.00 2,029,824.41 Signed 2020-06-21 2020-06-15 2020-06-26 2020-06-15 2020-07-31 2020-06-15 2021-01-27 COVID-19 Response IN-MOH&FW-185771-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 444,000.00 452,945.95 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 COVID-19 Response Coveralls IN-MOH&FW-185772-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 110,134.00 112,476.17 Signed 2020-08-09 2020-08-16 2020-08-14 2020-08-16 2020-09-18 2020-08-16 2021-03-17 COVID-19 Response Coveralls IN-MOH&FW-185775-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 113,173.00 124,343.36 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 COVID-19 Response Coveralls IN-MOH&FW-185776-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 444,000.00 453,805.72 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-19 2020-09-18 2020-08-19 2021-03-17 COVID-19 Response Coveralls IN-MOH&FW-185777-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 295,200.00 300,254.71 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 COVID-19 Response Coveralls IN-MOH&FW-185778-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 444,000.00 452,945.94 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 COVID-19 Response Coveralls IN-MOH&FW-185779-GO- Component 1: Emergency COFN / C1660 Post Direct Selection Direct 377,334.00 384,774.78 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-19 2020-09-18 2020-08-19 2021-03-17 DIR / Procurement of Goggles COVID-19 Response IN-MOH&FW-185780-GO- Component 1: Emergency COFN / C1660 Post Direct Selection Direct 264,000.00 269,342.34 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 DIR / Procurement of Goggles COVID-19 Response IN-MOH&FW-185782-GO- Component 1: Emergency COFN / C1660 Post Direct Selection Direct 377,334.00 384,774.78 Signed 2020-08-09 2020-08-16 2020-08-14 2020-08-16 2020-09-18 2020-08-16 2021-03-17 DIR / Procurement of Goggles COVID-19 Response IN-MOH&FW-185783-GO- Component 1: Emergency COFN / C1660 Post Direct Selection Direct 377,334.00 385,167.29 Signed 2020-08-09 2020-08-16 2020-08-14 2020-08-16 2020-09-18 2020-08-16 2021-03-17 DIR / Procurement of Goggles COVID-19 Response IN-MOH&FW-185784-GO- Component 1: Emergency COFN / C1660 Post Direct Selection Direct 5,334.00 4,814.59 Signed 2020-08-09 2020-08-17 2020-08-14 2020-08-17 2020-09-18 2020-08-17 2021-03-17 DIR / Procurement of Goggles COVID-19 Response IN-MOH&FW-185786-GO- Component 1: Emergency COFN / C1660 Post Direct Selection Direct 377,334.00 385,167.29 Signed 2020-08-09 2020-08-16 2020-08-14 2020-08-16 2020-09-18 2020-08-16 2021-03-17 DIR / Procurement of Goggles COVID-19 Response IN-MOH&FW-185787-GO- Component 1: Emergency DIR / Procurement of N - 95 COFN / C1660 Post Direct Selection Direct 1,102,667.00 1,125,308.68 Signed 2020-08-09 2020-08-16 2020-08-14 2020-08-16 2020-09-18 2020-08-16 2021-03-17 COVID-19 Response Masks IN-MOH&FW-185788-GO- Component 1: Emergency DIR / Procurement of N - 95 COFN / C1660 Post Direct Selection Direct 453,334.00 471,828.01 Signed 2020-08-09 2020-08-17 2020-08-14 2020-08-17 2020-09-18 2020-08-17 2021-03-17 COVID-19 Response Masks IN-MOH&FW-185789-GO- Component 1: Emergency DIR / Procurement of N - 95 COFN / C1660 Post Direct Selection Direct 462,667.00 462,690.37 Signed 2020-08-09 2020-08-17 2020-08-14 2020-08-17 2020-09-18 2020-08-17 2021-03-17 COVID-19 Response Masks IN-MOH&FW-185790-GO- Component 1: Emergency COFN / C1660 Post Direct Selection Direct 178,667.00 181,023.49 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 DIR / Procurement of Gloves COVID-19 Response Page 5 IN-MOH&FW-185791-GO- DIR / Procurement of Component 1: Emergency COFN / C1660 Post Direct Selection Direct 339,734.00 346,541.76 Signed 2020-08-09 2020-08-17 2020-08-14 2020-08-17 2020-09-18 2020-08-17 2021-03-17 Hydroxychloroquine Sulphate COVID-19 Response IP 200 IN-MOH&FW-185793-GO- DIR / Procurement of Component 1: Emergency COFN / C1660 Post Direct Selection Direct 52,267.00 53,314.12 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 Hydroxychloroquine Sulphate COVID-19 Response IP 200 IN-MOH&FW-185794-GO- DIR / Procurement of Component 1: Emergency COFN / C1660 Post Direct Selection Direct 3,109,867.00 3,172,189.95 Signed 2020-08-09 2020-08-17 2020-08-14 2020-08-17 2020-09-18 2020-08-17 2021-03-17 Hydroxychloroquine Sulphate COVID-19 Response IP 200 IN-MOH&FW-185795-GO- DIR / Procurement of Component 1: Emergency COFN / C1660 Post Direct Selection Direct 2,482,667.00 2,532,420.55 Signed 2020-08-09 2020-08-16 2020-08-14 2020-08-16 2020-09-18 2020-08-16 2021-03-17 Hydroxychloroquine Sulphate COVID-19 Response IP 200 IN-MOH&FW-185796-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 85,800.00 87,519.47 Signed 2020-08-09 2020-08-17 2020-08-14 2020-08-17 2020-09-18 2020-08-17 2021-03-17 COVID-19 Response Azithromycin IN-MOH&FW-185797-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 85,800.00 87,519.47 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 COVID-19 Response Azithromycin IN-MOH&FW-185798-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 171,600.00 175,038.95 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 COVID-19 Response Azithromycin IN-MOH&FW-185799-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 85,800.00 87,519.47 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 COVID-19 Response Azithromycin IN-MOH&FW-185801-GO- Component 1: Emergency DIR / Procurement of XPRSARS- COFN / C1660 Post Direct Selection Direct 2,952,320.00 3,011,485.97 Signed 2020-08-09 2020-08-17 2020-08-14 2020-08-17 2020-09-18 2020-08-17 2021-03-17 COVID-19 Response COV2(10 catrdiges) IN-MOH&FW-185803-GO- DIR / Procurement of Non Component 1: Emergency COFN / C1660 Post Direct Selection Direct 5,000.00 5,023.61 Signed 2020-08-09 2020-08-14 2020-08-14 2020-08-14 2020-09-18 2020-08-14 2021-03-17 Contact Handheld COVID-19 Response Thermometer IN-MOH&FW-194945-GO- Component 1: Emergency DIR / Procurement of COFN / C1660 Post Direct Selection Direct 444,500.00 456,931.11 Signed 2020-09-30 2021-01-01 2020-10-05 2021-01-01 2020-11-09 2021-01-01 2021-05-08 COVID-19 Response Coveralls IN-MOH&FW-208295-GO- Component 1: Emergency Single Stage - One RFB / Procurement of N - 95 COFN / C1660 Post Request for Bids Open - National 29,864.00 29,804.83 Signed 2020-12-16 2021-01-01 2020-12-21 2021-02-01 2021-01-04 2021-03-03 2021-01-04 2021-04-07 2021-01-04 2021-10-04 COVID-19 Response Envelope Masks IN-MOH&FW-208301-GO- Component 1: Emergency Single Stage - One RFB / Procurement of N - 95 COFN / C1660 Post Request for Bids Open - National 89,672.00 89,720.92 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Masks IN-MOH&FW-208302-GO- Component 1: Emergency Single Stage - One RFB / Procurement of N - 95 COFN / C1660 Post Request for Bids Open - National 44,795.00 44,819.34 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Masks IN-MOH&FW-208304-GO- Component 1: Emergency Single Stage - One RFB / Procurement of N - 95 COFN / C1660 Post Request for Bids Open - National 149,452.00 149,534.86 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Masks IN-MOH&FW-208307-GO- Component 1: Emergency Single Stage - One RFB / Procurement of N- 95 COFN / C1660 Post Request for Bids Open - National 74,657.00 74,512.07 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Masks IN-MOH&FW-208308-GO- Component 1: Emergency Single Stage - One RFB / Procurement of N - 95 COFN / C1660 Post Request for Bids Open - National 59,780.00 59,813.94 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Masks IN-MOH&FW-208309-GO- Component 1: Emergency Single Stage - One RFB / Procurement of COFN / C1660 Post Request for Bids Open - National 478,644.00 477,711.26 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Coveralls IN-MOH&FW-208310-GO- Component 1: Emergency Single Stage - One RFB / Procurement of COFN / C1660 Post Request for Bids Open - National 780,945.00 781,377.90 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Coveralls IN-MOH&FW-208311-GO- Component 1: Emergency Single Stage - One RFB / Procurement of Nitrile COFN / C1660 Post Request for Bids Open - National 358,340.00 357,698.97 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Gloves IN-MOH&FW-208312-GO- Component 1: Emergency Single Stage - One RFB / Procurement of Nitrile COFN / C1660 Post Request for Bids Open - National 373,288.00 372,560.37 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Gloves IN-MOH&FW-208313-GO- Component 1: Emergency Single Stage - One RFB / Procurement of Nitrile COFN / C1660 Post Request for Bids Open - National 297,048.00 297,212.53 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Gloves IN-MOH&FW-208316-GO- Component 1: Emergency Single Stage - One RFB / Procurement of Nitrile COFN / C1660 Post Request for Bids Open - National 584,753.00 583,614.10 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Gloves IN-MOH&FW-208318-GO- Component 1: Emergency Single Stage - One RFB / Procurement of Nitrile COFN / C1660 Post Request for Bids Open - National 182,061.00 181,706.92 Signed 2020-12-20 2021-01-01 2020-12-25 2021-02-05 2021-01-04 2021-03-07 2021-01-04 2021-04-11 2021-01-04 2021-10-08 COVID-19 Response Envelope Gloves IN-MOH&FW-210740-GO- DIR / Procurement of Component 1: Emergency Coveralls, N - 95 Masks, COFN / C1660 Post Direct Selection Direct 59,090,422.00 59,090,422.00 Signed 2020-12-27 2020-04-08 2021-01-01 2020-04-08 2021-02-05 2020-04-08 2021-08-04 COVID-19 Response Gloves, and Protective Goggles through Import Page 6 IN-MOH&FW-211025-GO- DIR / Procurement of PPE Kits, Component 1: Emergency COFN / C1660 Post Direct Selection Direct 25,691,700.00 25,691,700.00 Signed 2020-12-27 2020-04-02 2021-01-01 2020-04-02 2021-02-05 2020-04-03 2021-08-04 protective gloves, goggles, COVID-19 Response masks etc, through Imports IN-MOH&FW-211029-GO- DIR / Procurement of 10 Component 1: Emergency COFN / C1660 Post Direct Selection Direct 22,500,000.00 22,500,000.00 Signed 2020-12-27 2020-12-24 2021-01-01 2020-12-24 2021-02-05 2020-12-24 2021-08-04 million KN - 95 Masks COVID-19 Response through imports CMSS/PROC/2019/GOODS/01 Under Component 1: Emergency Single Stage - One / Procurement of Oxygen COFN / C1660 Post Request for Bids Open - National 121,233.00 0.00 Implementati 2021-02-08 2021-06-23 2021-02-13 2021-03-27 2021-04-26 2021-05-31 2021-11-27 COVID-19 Response Envelope Cylinders. on CMSS/PROC/2019/GOODS/02 Under Component 1: Emergency Single Stage - One / Procurement of Oxygen COFN / C1660 Prior Request for Bids Open - National 3,761,452.00 0.00 Implementati 2021-02-08 2021-02-13 2021-03-27 2021-04-26 2021-05-31 2021-11-27 COVID-19 Response Envelope Cylinders on CMSS/PROC/2019/GOODS/03 Under Component 1: Emergency Single Stage - One / Procurement of Oxygen COFN / C1660 Post Request for Bids Open - National 303,082.00 0.00 Implementati 2021-02-08 2021-06-23 2021-02-13 2021-03-27 2021-04-26 2021-05-31 2021-11-27 COVID-19 Response Envelope Cylinders on CMSS/PROC/2019/GOODS/04 Under Component 1: Emergency Single Stage - One / Procurement of Oxygen COFN / C1660 Post Request for Bids Open - National 129,477.00 0.00 Implementati 2021-02-08 2021-06-23 2021-02-13 2021-03-27 2021-04-26 2021-05-31 2021-11-27 COVID-19 Response Envelope Cylinders on CMSS/PROC/2019/GOODS/05 Under Component 1: Emergency Single Stage - One / Procurement of Oxygen COFN / C1660 Post Request for Bids Open - National 128,669.00 0.00 Implementati 2021-02-08 2021-06-23 2021-02-13 2021-03-27 2021-04-26 2021-05-31 2021-11-27 COVID-19 Response Envelope Cylinders on CMSS/PROC/2019/GOODS/06 Under Component 1: Emergency Single Stage - One / Procurement of Oxygen COFN / C1660 Post Request for Bids Open - National 133,356.00 0.00 Implementati 2021-02-08 2021-06-23 2021-02-13 2021-03-27 2021-04-26 2021-05-31 2021-11-27 COVID-19 Response Envelope Cylinders on CMSS/PROC/2019/GOODS/07 Under Component 1: Emergency Single Stage - One / Procurement of Oxygen COFN / C1660 Prior Request for Bids Open - National 4,159,904.00 0.00 Implementati 2021-02-08 2021-02-13 2021-03-27 2021-04-26 2021-05-31 2021-11-27 COVID-19 Response Envelope Cylinders on IN-MOH&FW-229131-GO- Component 1: Emergency DIR / Procurement of Truenat COFN / C1660 Post Direct Selection Direct 20,252,055.00 18,006,225.60 Signed 2021-04-25 2021-06-01 2021-04-30 2021-06-01 2021-06-04 2021-06-01 2021-12-01 COVID-19 Response Chips for Covid - 19 Testing IN-MOH&FW-235738-GO- Component 1: Emergency DIR / Procurement of Oxygen COFN / C1660 Post Direct Selection Direct 16,100,000.00 16,100,000.00 Signed 2021-05-31 2021-06-01 2021-06-05 2021-06-01 2021-07-10 2021-06-01 2022-01-06 COVID-19 Response Concentrator NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-MOH&FW-236989-NC- DIR / Freight & Insurance Component 1: Emergency services for imported oxygen COFN / C1660 Post Direct Selection Direct 3,868,172.00 3,868,172.00 Signed 2021-05-28 2021-06-01 2021-06-02 2021-06-01 2021-07-07 2021-06-01 2022-01-03 COVID-19 Response concentrators under Emergency Response CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 7 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) July 9, 2010 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under July 9, 2010 other methods July 9, 2010 PROCUREMENT Bangladesh : Bangladesh NATP-2: National Agricultural Technology Program - Phase II Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-03-09 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149553 GPN Date: Project Name: Bangladesh NATP-2: National Agricultural Technology Program - Phase II Project Loan / Credit No: IDA / 56650 Bangladesh Agricultural Research Council Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned WD/PIU-BARC-6A / WD/PIU- Enhancing Agricultural Request for Single Stage - One 2018-03- BARC-6a: Repair and IDA / 56650 Post Limited 12,910.00 11,720.73 Completed 2017-08-04 2017-09-28 2017-09-08 2017-10-04 Technology Generation Quotations Envelope 07 Renovation of Admin Building WD/PIU-BARC-6B / Repair Enhancing Agricultural Request for Single Stage - One 2018-09- and Renovation of 2nd Admin IDA / 56650 Post Limited 13,000.00 11,734.51 Completed 2018-01-26 2017-12-21 2018-03-23 2017-12-28 Technology Generation Quotations Envelope 19 Building (PIU-BARC office) WD/PIU-BARC-6C / Maintenance of Training Enhancing Agricultural Single Stage - One 2018-07- Building (3rd and 4th floor) IDA / 56650 Post Request for Bids Open - National 26,000.00 17,403.95 Signed 2018-04-08 2018-04-12 2018-04-13 2018-04-28 2018-05-20 2018-05-12 2018-06-07 2018-06-05 2018-06-20 Technology Generation Envelope 05 with provision of wiring and associated materials. WD/PIU-BARC-6E / Repair Enhancing Agricultural Single Stage - One 2019-07- and Maintenance of BARC IDA / 56650 Post Request for Bids Open - National 61,000.00 39,697.17 Signed 2019-01-01 2019-08-22 2019-01-06 2019-01-27 2019-09-09 2019-02-17 2019-09-23 2019-03-24 2019-09-30 Technology Generation Envelope 22 Auditorium WD/PIU-BARC/6D / Repair Enhancing Agricultural Request for Single Stage - One 2018-12- and Maintenance of BARC IDA / 56650 Post Limited 12,200.00 11,648.26 Completed 2018-11-03 2018-11-05 2018-11-30 2018-11-14 Technology Generation Quotations Envelope 30 Banglow WD/PIU-BARC/ 1C / Installation of False celling, Enhancing Agricultural Single Stage - One 2019-09- paten stone of top floor and IDA / 56650 Post Request for Bids Open - National 30,500.00 49,613.16 Completed 2019-01-01 2020-01-06 2019-01-06 2019-01-21 2020-01-27 2019-02-05 2020-02-18 2019-03-10 2020-03-23 Technology Generation Envelope 06 Dias works of training building of BARC NATP-2/WD/PIU-BARC-1B / Vertical Extension of Enhancing Agricultural Single Stage - One 2020-06- Agricultural Information IDA / 56650 Post Request for Bids Open - National 383,430.00 0.00 Canceled 2019-09-24 2019-09-29 2019-10-13 2019-11-12 2019-12-24 Technology Generation Envelope 21 Center (AIC) Building (6th floor), BARC Complex NATP-2:WD/PIU-BARC-6F / Repair & Renovation Works of Enhancing Agricultural Single Stage - One 2021-08- IDA / 56650 Post Request for Bids Open - National 18,300.00 16,169.75 Signed 2020-10-14 2020-10-21 2020-10-19 2020-10-21 2020-11-30 2020-11-05 2020-12-30 2020-12-28 2021-02-03 2021-01-11 Main Building, AIC Building Technology Generation Envelope 02 and Admin Building GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD/PIU-BARC-03 / Office Enhancing Agricultural Request for Single Stage - One IDA / 56650 Post Limited 6,452.00 5,864.02 Completed 2017-04-09 2017-05-29 2017-05-02 2017-06-05 2017-05-16 2017-06-18 Supply & Consumable-1 Technology Generation Quotations Envelope GD/PIU-BARC-35 / Repair Enhancing Agricultural Request for Single Stage - One and Maintenance of Air Cooler IDA / 56650 Post Limited 6,452.00 5,825.44 Completed 2017-08-18 2017-09-24 2017-09-22 2017-09-27 2018-03-21 2017-10-10 Technology Generation Quotations Envelope of BARC GD/PIU-BARC-1 / Supply and Installation of Electrical Enhancing Agricultural Single Stage - One IDA / 56650 Post Request for Bids Open - National 83,880.00 55,292.24 Signed 2018-04-08 2018-04-22 2018-04-13 2018-05-25 2018-05-20 2018-06-24 2018-06-07 2018-07-29 2018-06-21 2018-10-27 Equipment (Transformer-sub Technology Generation Envelope station) GD/PIU-BARC-5 / Printing & Binding of Documents Enhancing Agricultural Request for Single Stage - One IDA / 56650 Post Limited 6,450.00 5,839.25 Completed 2018-10-29 2018-11-21 2018-12-24 2018-12-03 2019-06-22 2019-01-03 (Annual Progress Report and Technology Generation Quotations Envelope others Printing Materials) GD/PIU-BARC-04 / Purchase Enhancing Agricultural Single Stage - One of books, Journals and other IDA / 56650 Post Request for Bids Open - National 24,500.00 15,654.43 Signed 2018-12-10 2020-12-15 2018-12-15 2020-12-17 2018-12-30 2021-01-04 2019-01-20 2021-02-16 2019-02-22 2021-03-14 2019-04-23 Technology Generation Envelope related materials GD/PIU-BARC-34 / Purchase Enhancing Agricultural Request for Single Stage - One of computer consumable IDA / 56650 Post Limited 6,100.00 5,899.05 Completed 2018-11-04 2018-11-04 2018-11-27 2018-11-14 2018-12-12 2018-11-19 Technology Generation Quotations Envelope items GD/PIU-BARC-06 / Supply of Enhancing Agricultural Request for Single Stage - One IDA / 56650 Post Limited 6,100.00 5,913.90 Completed 2018-11-02 2018-11-04 2018-11-18 2018-11-11 2018-12-03 2018-11-18 Office Stationary-2 Technology Generation Quotations Envelope GD/PIU-BARC-21 / Hiring of Enhancing Agricultural Single Stage - One IDA / 56650 Post Request for Bids Open - National 18,500.00 14,161.34 Signed 2018-10-29 2019-01-23 2018-10-31 2018-11-15 2019-01-24 2018-11-25 2019-02-19 2018-12-28 2019-02-26 2019-12-28 Vehicle-2 Technology Generation Envelope GD/PIU-BARC-36 / Equipment : 86 inch Enhancing Agricultural Single Stage - One IDA / 56650 Post Request for Bids Open - National 12,900.00 11,006.57 Completed 2019-03-08 2019-04-08 2019-03-13 2019-04-24 2019-04-25 2019-05-24 2019-05-14 2019-06-28 2019-05-22 2019-12-25 2019-06-30 Android/Windows Interactive Technology Generation Envelope TV for BARC Conference Room GD/PIU-BARC-37 / Equipment: (Lawn Mower-1, Enhancing Agricultural Request for Single Stage - One Foggier Machine-1, Vacuum IDA / 56650 Post Limited 2,580.00 0.00 Canceled 2019-04-09 2019-06-04 2019-12-01 Technology Generation Quotations Envelope Cleaner-1, Pocket Projector- 1) for BARC & PIU-BARC, NATP- 2 Page 1 GD/PIU-BARC-12 / Electric Enhancing Agricultural Single Stage - One Equipment (Smart LED TV, no- IDA / 56650 Post Request for Bids Open - National 15,400.00 14,142.48 Signed 2019-04-04 2019-12-18 2019-04-09 2019-12-17 2019-05-21 2020-01-06 2019-06-20 2020-01-09 2019-07-25 2020-01-21 2020-01-21 Technology Generation Envelope 2) NATP-2/GD/PIU-BARC-10A / ICT Hardware Equipment Enhancing Agricultural Single Stage - One (Desk Computer, Laptop, IDA / 56650 Post Request for Bids Open - National 1,088,760.00 0.00 Canceled 2019-08-26 2019-09-01 2019-09-22 2019-10-06 2019-11-17 2020-05-15 Technology Generation Envelope Printer, Scanner, UPS-online & UPS offline etc.) for NARIs NATP-2/GD/PIU-BARC-10B / ICT Network Equipment Enhancing Agricultural Single Stage - One (Server, LAN Cables, Net IDA / 56650 Post Request for Bids Open - National 1,396,450.00 0.00 Canceled 2019-08-29 2019-09-03 2019-09-24 2019-10-08 2019-11-12 2020-05-10 Technology Generation Envelope Switch, Core Switch and Access point) for NARIs NATP-2/GD/PIU-BARC-16 / Enhancing Agricultural Single Stage - One Printing & Binding of IDA / 56650 Post Request for Bids Open - National 11,840.00 10,539.81 Signed 2019-09-25 2020-02-04 2019-09-30 2019-10-14 2020-02-24 2019-10-28 2020-02-24 2019-12-02 2020-06-14 2020-01-01 Technology Generation Envelope Documents-2 NATP-2/GD/PIU-BARC-08 / Enhancing Agricultural Single Stage - One Special Research Equipment IDA / 56650 Post Request for Bids Open - National 946,750.00 0.00 Canceled 2019-09-22 2019-09-27 2019-10-18 2019-11-08 2019-12-20 2020-06-17 Technology Generation Envelope for NARS NATP-2/GD/PIU-BARC-22 / Enhancing Agricultural Single Stage - One Printing & binding of IDA / 56650 Post Request for Bids Open - National 23,600.00 12,590.99 Signed 2020-11-15 2021-02-23 2020-11-20 2021-02-24 2021-01-01 2021-03-15 2021-01-31 2021-05-02 2021-03-07 2021-05-19 2021-09-03 Technology Generation Envelope Document-3 NATP-2/PIU-BARC-28 / Enhancing Agricultural Single Stage - One IDA / 56650 Post Request for Bids Open - National 91,700.00 83,475.11 Signed 2020-11-01 2021-04-04 2020-11-06 2021-04-04 2020-12-18 2021-05-03 2021-01-17 2021-05-24 2021-02-21 2021-06-07 2021-08-20 Furniture-2 Technology Generation Envelope NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SD/PIU-BARC/22 / Hiring of Enhancing Agricultural Request for Single Stage - One Vehicle ( Goods Package no. IDA / 56650 Post Limited 6,450.00 5,813.96 Signed 2017-09-15 2017-10-08 2017-10-20 2017-10-12 2018-10-20 Technology Generation Quotations Envelope GD/PIU-BARC-2 in DPP ) SD/PIU-BARC/23 / Service & Maintenance of Lift at Office of NATP-2, BARC Part, Admin Enhancing Agricultural Building, BARC for 12 months. IDA / 56650 Post Direct Selection Direct 1,070.00 978.72 Signed 2017-11-15 2017-11-15 2017-11-20 2017-11-16 2017-11-30 2017-11-30 2018-11-30 Technology Generation Contract will be renewed every year after satisfaction of services. SD/PIU-BARC-20 / Hiring of International Consulting Firm for Providing Professional & Logistics Services for Implementation of Enhancing Agricultural Single Stage - One IDA / 56650 Prior Request for Bids Open - International 9,550,000.00 0.00 Canceled 2017-12-26 2017-12-31 2018-02-11 2018-03-13 2018-04-17 2018-10-14 International Higher Studies Technology Generation Envelope (PhD. program), Workshop, Training, Study Visit etc. Programs under PIU-BARC, NATP-II GD-PIU-BARC-34 / Supply Enhancing Agricultural Request for Single Stage - One and Installation of Payroll IDA / 56650 Post Limited 6,451.00 0.00 Canceled 2018-01-11 2018-03-04 2018-08-31 Technology Generation Quotations Envelope System Software SD/PIU-BARC/22C-1 / Hiring Enhancing Agricultural Single Stage - One IDA / 56650 Post Request for Bids Open - National 17,700.00 0.00 Canceled 2021-02-08 2021-04-12 2021-02-13 2021-04-13 2021-03-27 2021-05-06 2021-04-26 2021-05-09 2021-05-31 2021-11-27 of Vehicle-3 Technology Generation Envelope Under SD/PIU-BARC/22C-1A / Enhancing Agricultural Single Stage - One IDA / 56650 Post Request for Bids Open - National 17,700.00 0.00 Implementati 2021-06-01 2021-06-01 2021-06-06 2021-06-02 2021-06-15 2021-06-14 2021-06-30 2021-08-04 2022-01-31 Hiring of Vehicle-3 Technology Generation Envelope on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SD/PIU-BARC/19 / Hiring of Firm for Design, Management Enhancing Agricultural Quality And Cost- IDA / 56650 Post Open - National 79,800.00 79,100.57 Signed 2018-07-29 2018-09-13 2018-08-12 2018-09-25 2019-05-13 2018-10-23 2019-06-13 2018-11-22 2019-11-13 2018-12-27 2019-12-15 2019-01-31 2020-01-01 2021-01-30 and Supervision of Technology Generation Based Selection Construction Works SD/PIU-BARC-20 A / Hiring of Consulting Firm for Providing Professional & Enhancing Agricultural Quality And Cost- Logistics Services for IDA / 56650 Prior Open - International 5,880,625.00 0.00 Canceled 2018-07-30 2018-08-20 2018-09-19 2018-10-31 2018-11-21 2019-01-30 2019-03-13 2021-09-30 Technology Generation Based Selection implementation of International Higher Studies (PhD program) SD-PIU-BARC-20 / Hiring of Consulting Firm for Providing Professional & Logistics Services for Implementation of Enhancing Agricultural Quality And Cost- International Higher Studies IDA / 56650 Prior Open - International 8,576,465.00 0.00 Canceled 2018-10-15 2019-02-24 2018-11-05 2019-04-11 2018-12-19 2019-02-12 2019-03-14 2019-04-18 2019-05-30 2021-09-21 Technology Generation Based Selection (PhD. program), Workshop, Training, Study Visit etc. Programs under PIU-BARC, NATP-II SD/PIU-BARC/21 / Hiring of Enhancing Agricultural Quality And Cost- IDA / 56650 Post Open - National 83,500.00 0.00 Canceled 2018-08-22 2018-09-12 2018-10-26 2018-11-23 2018-12-23 2019-01-27 2019-03-03 2020-03-02 Firm for ICT management Technology Generation Based Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Page 2 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SD/PIU-BARC-04 / Research Individual Enhancing Agricultural Management Specialist, 01 IDA / 56650 Post Consultant Open 267,100.00 183,284.03 Signed 2017-02-23 2017-04-29 2017-07-10 2017-05-06 2017-07-16 2017-05-20 2017-09-13 2021-09-30 Technology Generation position, 72 mm Selection SD/PIU-BARC-06 / Training Individual Enhancing Agricultural & Communication Specialist, IDA / 56650 Post Consultant Open 267,100.00 190,088.77 Signed 2017-02-23 2017-04-29 2017-05-06 2017-07-16 2017-05-20 2017-07-20 2021-09-30 Technology Generation 01 position, 72 mm Selection SD/PIU-BARC-07 / Assistant Individual Enhancing Agricultural Manager (Administration), one IDA / 56650 Post Consultant Open 160,260.00 150,047.09 Signed 2017-02-27 2017-05-03 2017-12-03 2017-05-10 2017-12-06 2017-05-20 2017-12-17 2021-08-22 Technology Generation Position, 72 mm Selection SD/PIU-BARC-08 / Assistant Individual Enhancing Agricultural Manager (Accounts), One IDA / 56650 Post Consultant Open 160,260.00 102,189.35 Signed 2017-02-27 2017-05-03 2017-12-03 2017-05-10 2017-12-06 2017-05-20 2017-12-26 2021-09-30 Technology Generation Position, 72 mm Selection SD/PIU-BARC/12A / Technical Assistance - Enhancing Agricultural IDA / 56650 Post Direct Selection Direct 17,810.00 13,416.07 Completed 2017-07-30 2017-08-21 2017-08-09 2017-10-05 2017-10-13 2017-10-15 2018-04-11 2018-01-15 National (Individual) Short Technology Generation Term Consultant for Fisheries SD/PIU-BARC-02 / Monitoring and Evaluation Individual Specialist ( considering Enhancing Agricultural IDA / 56650 Post Consultant Open 170,650.00 130,824.24 Signed 2017-12-17 2017-08-20 2018-01-23 2018-10-28 2018-02-06 2018-11-04 2018-03-13 2018-11-14 2018-09-09 current time period LOE is 46 Technology Generation Selection months till project end period September 2021) SD/PIU-BARC/09 / Assistant Individual ICT Specialist (46 months Enhancing Agricultural IDA / 56650 Post Consultant Open 102,400.00 78,494.54 Signed 2017-12-17 2017-08-20 2018-01-23 2018-10-28 2018-02-13 2018-11-04 2018-03-20 2018-11-11 2018-09-16 considering project end Technology Generation Selection period) SD/PIU-BARC/10C / Individual Technical Assistance-National Enhancing Agricultural IDA / 56650 Post Consultant Limited 17,000.00 17,502.36 Signed 2018-10-30 2018-09-26 2018-11-14 2018-12-24 2018-12-05 2019-01-15 2019-01-02 2019-01-17 2019-05-02 (Individual) Short term Technology Generation Selection Consultant for ICT (Software) SD/PIU-BARC/10D / Individual Technical Assistance-National Enhancing Agricultural IDA / 56650 Post Consultant Limited 17,000.00 17,502.36 Signed 2018-11-04 2018-09-26 2018-11-14 2018-12-24 2018-12-14 2019-01-14 2019-01-11 2019-01-17 2019-05-11 2019-05-16 (Individual) Short term Technology Generation Selection Consultant for ICT (Hardware) SD/PIU-BARC/10B / Technical Assistance-National Enhancing Agricultural (Individual) Short term IDA / 56650 Post Direct Selection Direct 12,700.00 12,722.65 Signed 2018-11-11 2018-11-05 2018-11-23 2019-06-27 2019-01-27 2019-07-09 2019-04-27 Technology Generation Consultant for Agricultural Engineering SD/PIU-BARC/12B / Technical Assistance-National Enhancing Agricultural IDA / 56650 Post Direct Selection Direct 12,625.00 12,663.47 Signed 2018-11-25 2018-11-05 2018-12-10 2019-07-30 2019-02-06 2019-08-25 2019-05-07 (Individual) Short term Technology Generation Consultant for Fisheries SD/PIU-BARC/11A / Technical Assistance-National Enhancing Agricultural IDA / 56650 Post Direct Selection Direct 12,625.00 12,663.47 Signed 2018-11-13 2018-11-05 2018-11-28 2019-07-30 2019-02-01 2019-08-25 2019-05-02 (Individual) Short term Technology Generation Consultant for Livestock SD/PIU-BARC-10A / Individual Technical Assistance-National Enhancing Agricultural IDA / 56650 Post Consultant Direct 12,700.00 12,722.65 Signed 2018-11-14 2018-11-05 2018-11-26 2019-06-27 2018-12-03 2019-07-02 2018-12-17 2019-07-09 2019-03-17 (Individual) Short term Technology Generation Selection Consultant for Soils SD/PIU-BARC-17A / Technical Assistance- International (Individual) Short Enhancing Agricultural IDA / 56650 Post Direct Selection Direct 6,300.00 0.00 Canceled 2019-03-10 2019-03-20 2019-05-24 2019-11-20 term Specialist for Vegetable Technology Generation Breeding, for 10 days breeding training program Individual NATP-2/SD/PIU-BARC-9A / Enhancing Agricultural IDA / 56650 Post Consultant Open 97,400.00 13,286.88 Signed 2020-10-15 2020-10-25 2020-12-03 2021-03-23 2020-12-24 2021-03-29 2021-01-28 2021-04-04 2021-07-27 Assistant ICT Specialist Technology Generation Selection SD/PIU-BARC/10E-1 / Technical Assistance: National Enhancing Agricultural Pending IDA / 56650 Post Direct Selection Direct 18,240.00 0.00 2021-02-07 2021-02-17 2021-04-23 2021-10-20 (Individual) Short Term Technology Generation Implementation Consultant (Documentary) SD/PIU-BARC/10E-2 / Technical Assistance: National Enhancing Agricultural Pending IDA / 56650 Post Direct Selection Direct 11,800.00 0.00 2021-04-18 2021-04-28 2021-07-02 2021-12-29 (Individual) Short Term Technology Generation Implementation Consultant (Crops) SD/PIU-BARC/11B / Technical Assistance: National Enhancing Agricultural Pending IDA / 56650 Post Direct Selection Direct 11,800.00 0.00 2021-04-18 2021-04-28 2021-07-02 2021-12-29 (Individual) Short Term Technology Generation Implementation Consultant (Livestock) SD/PIU-BARC/12C-1 / Technical Assistance: National Enhancing Agricultural Pending IDA / 56650 Post Direct Selection Direct 11,800.00 0.00 2021-04-18 2021-04-28 2021-07-02 2021-12-29 (Individual) Short Term Technology Generation Implementation Consultant (Fisheries) Page 3 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan latest: October 17, 2017 2. Period covered by this procurement plan: till the project closing date, i.e. December, 2019 3. The GPN was published on July 9, 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Thresholds Works, Turnkey and S&I of Plant & Equip –USD 15 mil Goods and IT System and Non-Consultant Services – 3 mil Consultant (Firms) – 1 mil Consultant (Individuals) -0.3 mil DC- USD 80K SSS- USD 10K (Firms) and USD 5K (Individuals) 2. Prequalification. Not applicable 3. Reference to (if any) Project Operational/Procurement Manual: POM has been developed and agreed with the Bank on March, 2013. 4. Any Other Special Procurement Arrangements: procurement on Performance -based contracts: on the basis of the Memorandum of understanding the SHA enters into contracts with PHC facilities. Retroactive financing in amount up to USD 7 mil. Was planned for procurement of angiograph equipment for Gyumri hospital and NMS cardiology center in Yerevan. 5. Procurement Packages 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT Armenia : Disease Prevention and Control Project PLAN General Information Country: Armenia Bank’s Approval Date of the Original Procurement Plan: 2016-09-15 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P128442 GPN Date: 2021-02-02 Project Name: Disease Prevention and Control Project Loan / Credit No: IDA / 52220, TF / 14138, TF / 13103, IBRD / 92020 H Executing Agency(ies): ealth Project Implementation Unit State Agency WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Performance-based CR4/NCB/B-W/005-16 / incentives to improve MCH Single Stage - One 3,433,335.6 Renovation of Artashat MC of IDA / 52220 Prior Request for Bids Open - National Signed 2016-05-26 2016-06-06 and NCD services in primary Envelope 2 Ararat marz of RA care faci CR4/NCB/B-W/007-19 / Construction of Martuni Single Stage - One 4,330,485.3 2022-04- IDA / 52220 Hospital Modernization Post Request for Bids Open - National Signed 2019-12-13 2019-12-23 2019-12-16 2019-12-30 2020-01-31 2020-02-18 2020-03-31 2020-05-06 2020-05-02 2020-07-02 medical center of Envelope 0 16 Gegharkunik marz Request for CR5/AF/RFB/B-W/001-21 / Bids - Small Under Single Stage - One 2023-07- Construction works of Vayots IBRD / 92020 Hospital Modernization Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-25 2021-02-26 2021-05-26 2021-05-26 2021-03-30 2021-06-15 2021-06-01 2021-07-27 Envelope 17 Dzor regional hospital envelope ion process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CR4/ICB/A-G/004/1 -14 / Performance-based Procurement of Medical incentives to improve MCH Single Stage - One equipment (Microscope IDA / 52220 Prior Request for Bids Open - International 9,047.12 Signed 2015-01-16 2015-02-05 and NCD services in primary Envelope Binoculars) for cytology care faci laboratories CR4/ICB/A-G/004/3-14 / Performance-based Procurement of Medical incentives to improve MCH Single Stage - One IDA / 52220 Prior Request for Bids Open - International 4,338.22 Signed 2015-01-16 2015-02-12 supplies for cytology and NCD services in primary Envelope laboratories care faci Performance-based CR4/ICB/A-G/004/ -14 Lot 2 incentives to improve MCH Single Stage - One IDA / 52220 Prior Request for Bids Open - International 39,891.46 Signed 2015-02-18 2015-03-04 / Procurement of Fume Hood and NCD services in primary Envelope care faci CR4/ICB/B-G/005-14 / Development of engineering Performance-based design , civil works, supply incentives to improve MCH Single Stage - One IDA / 52220 Prior Request for Bids Open - International 6,512,592.91 Signed 2015-06-25 2015-07-14 and installation of and NCD services in primary Envelope Chemotherapy and Bone care faci Marrow Transplantation depart CR4/ICB/B-G/008-15-3 / Performance-based Supply and Installation of incentives to improve MCH Single Stage - One Surgery and Hospital IDA / 52220 Prior Request for Bids Open - International 397,302.77 Signed 2015-07-08 2015-08-07 and NCD services in primary Envelope equipment for Meghri RMC care faci CJSC- Lot 3 CR4/ICB/B-G/008/ -15-4 / Performance-based Supply and Installation of incentives to improve MCH Single Stage - One IDA / 52220 Prior Request for Bids Open - International 125,683.57 Signed 2015-07-08 2015-08-12 Medical Furniture for Meghri and NCD services in primary Envelope RMC CJSC- Lot 4 care faci CR4/ICB/B-G/008-15-1 / Performance-based Supply and Installation of incentives to improve MCH Single Stage - One Diagnosing and Imaging IDA / 52220 Prior Request for Bids Open - International 228,282.06 Signed 2015-07-09 2015-08-11 and NCD services in primary Envelope equipment for Meghri RMC care faci CJSC - Lot 1 CR4/ICB/A-G/009-15 / Performance-based Supply of IT equipment for incentives to improve MCH Single Stage - One Integrated Health Information IDA / 52220 Prior Request for Bids Open - International 245,438.42 Signed 2015-07-30 2015-08-24 and NCD services in primary Envelope Systems in Republic of care faci Armenia. CR4/ICB/B-G/012-15-3 / Lot 3 - Supply and Installation Performance-based of Surgery and Hospital incentives to improve MCH Single Stage - One IDA / 52220 Prior Request for Bids Open - International 527,015.50 Signed 2016-02-22 2016-03-09 equipment for "Center of and NCD services in primary Envelope Hematology named after R.H. care faci Yeolyan" CJSC CR4/ICB/B-G/012-15-1 / Lot 1- Supply and Installation Performance-based of Diagnostic and Imaging incentives to improve MCH Single Stage - One IDA / 52220 Prior Request for Bids Open - International 1,197,652.62 Signed 2016-02-22 2016-03-24 equipment for "Center of and NCD services in primary Envelope Hematology named after R.H. care faci Yeolyan" CJSC CR4/ICB/B-G/012-15-4 / Performance-based Lot 4 -Supply and Installation incentives to improve MCH Single Stage - One of Medical Furniture for IDA / 52220 Prior Request for Bids Open - International 404,732.18 Signed 2016-02-22 2016-03-03 and NCD services in primary Envelope "Center of Hematology named care faci after R.H. Yeolyan" CJSC CR4/ICB/B-G/012-15-2 / Lot 2- Supply and Installation Performance-based of Medical Laboratory incentives to improve MCH Single Stage - One IDA / 52220 Prior Request for Bids Open - International 577,730.79 Signed 2016-02-22 2016-03-24 equipment for "Center of and NCD services in primary Envelope Hematology named after R.H. care faci Yeolyan" CJSC Page 1 CR4/ICB/B-G/013-16 / Supply and training for medical, diagnostic Single Stage - One IDA / 52220 Hospital Modernization Prior Request for Bids Open - International 3,034,785.71 Signed 2016-10-20 2016-11-14 2016-10-25 2017-01-16 2016-12-06 2017-03-01 2017-02-04 2017-05-31 2017-03-18 2017-07-14 2017-07-16 equipment, medical supplies Envelope and furniture for Vanadzor MC, 4 Lots Performance-based CR4/A-G/021-17 / PR incentives to improve MCH Request for Single Stage - One campaign, printing and IDA / 52220 Post Limited 31,341.15 Signed 2017-07-03 2017-07-31 2017-07-17 2017-08-18 2017-12-31 and NCD services in primary Quotations Envelope distribution of PR materials. care faci CR4/NCB/B-G/017-17 / Medical equipment and Single Stage - One furniture for Maternity IDA / 52220 Hospital Modernization Post Request for Bids Open - National 463,414.66 Signed 2017-07-24 2017-09-04 2017-07-29 2017-09-09 2017-10-02 2017-10-21 2017-11-14 2017-11-25 2017-12-05 2018-05-24 Envelope Hospital of Vanadzor MC, comprising of 2 Lots CR4/ICB/B-G/018-17 / Supply and training for Single Stage - One medical, diagnostic IDA / 52220 Hospital Modernization Post Request for Bids Open - International 1,581,202.03 Completed 2017-11-20 2017-11-24 2018-01-11 2018-01-05 2018-01-18 2018-03-06 2018-03-12 2018-04-17 2018-04-16 2018-08-15 2018-09-14 Envelope equipment and furniture for Artashat MC and Sevan MC CR4/B-G/SH/022-18 / Procurement of X-ray film Request for Single Stage - One IDA / 52220 Hospital Modernization Post Limited 6,754.65 Signed 2018-09-15 2018-09-11 2018-10-27 2018-10-17 2018-11-26 scanner for "Meghri Regional Quotations Envelope Medical Center" CJSC Performance-based CR4/A-G/SH/023-18 / IT incentives to improve MCH Request for Single Stage - One equipment for E-Health IDA / 52220 Post Limited 37,539.16 Signed 2018-09-17 2018-10-04 2018-10-16 2018-10-18 2018-11-30 and NCD services in primary Quotations Envelope system care faci Performance-based CR4/ICB/A-G/019-19 / incentives to improve MCH Single Stage - One IDA / 52220 Post Request for Bids Open - International 81,074.80 Signed 2019-01-14 2019-01-16 2019-01-17 2019-01-16 2019-02-28 2019-02-28 2019-04-29 2019-05-02 2019-06-01 2019-05-16 2019-07-31 Procurement of First AID Kits and NCD services in primary Envelope care faci CR4/NCB/B-G/020-19 / Single Stage - One Procurement of dialysis IDA / 52220 Hospital Modernization Post Request for Bids Open - National 175,924.31 Signed 2019-04-30 2019-05-30 2019-05-18 2019-05-31 2019-06-15 2019-06-27 2019-07-15 2019-08-19 2019-08-13 2019-10-03 2019-11-11 Envelope equipment for Martuni MC Performance-based CR4/A-G/SH/025/1-19 / incentives to improve MCH Request for Single Stage - One Printing of additional IDA / 52220 Post Open - National 10,023.20 Signed 2019-07-29 2019-09-09 2019-08-13 2019-10-09 and NCD services in primary Quotations Envelope brochures and posters care faci CR4/DC/D-G/021-20 / UNDP will support the Government of Armenia in strengthening its national Emergency response to UN Agencies IDA / 52220 Post Direct 1,138,359.82 Completed 2020-03-31 2020-04-02 2020-04-05 2020-04-02 2020-04-15 2020-04-03 2020-08-13 2020-06-22 response to COVID-19 COVID-19 (Direct) pandemic through sourcing, procurement and delivery of 50 (fifty) VG70 ventilators. CR4/DC/D-G/022-20 / Supply of 3 Portable Emergency response to IDA / 52220 Post Direct Selection Direct 41,524.85 Completed 2020-04-07 2020-04-07 2020-04-12 2020-04-10 2020-04-18 2020-04-16 2020-05-18 2020-06-04 Ultrasound Systems and COVID-19 related services CR4/DC/D-G/023-20 / Emergency response to UN Agencies Procurement of personal IDA / 52220 Post Direct 41,364.00 Completed 2020-04-07 2020-04-07 2020-04-12 2020-04-07 2020-04-18 2020-04-07 2020-05-18 2020-04-07 COVID-19 (Direct) protective equipment (PPE) CR4/DC/D-G/024-20 / Emergency response to Procurement of 30 Patient IDA / 52220 Post Direct Selection Direct 16,958.15 Completed 2020-04-15 2020-04-15 2020-04-20 2020-04-16 2020-04-30 2020-04-27 2020-05-30 2020-06-29 COVID-19 Monitors and Related Services CR4/DC/D-G/025-20 / Emergency response to Procurement of 150 Syringe IDA / 52220 Post Direct Selection Direct 0.00 Canceled 2020-04-14 2020-04-19 2020-04-29 2020-06-08 COVID-19 Pumps and Related Services CR4/DC/D-G/026-20 / Procurement of oxygen Emergency response to concentrators and long range IDA / 52220 Post Direct Selection Direct 53,387.27 Completed 2020-04-16 2020-04-16 2020-04-21 2020-04-16 2020-05-01 2020-04-16 2020-06-10 2020-06-24 COVID-19 handheld infrared thermometers CR4/DC/D-G/027-20 / Procurement of patient Emergency response to IDA / 52220 Post Direct Selection Direct 70,589.56 Completed 2020-04-16 2020-04-16 2020-04-21 2020-04-16 2020-05-01 2020-04-23 2020-05-31 2020-06-26 monitors, electrocardiographs COVID-19 and finger pulse oximeters CR4/DC/D-G/028-20 / Emergency response to IDA / 52220 Post Direct Selection Direct 76,970.79 Completed 2020-04-17 2020-04-17 2020-04-22 2020-05-13 2020-04-30 2020-05-19 2020-05-30 2020-06-02 Procurement of 6 SUV vehicles COVID-19 CR4/DC/D-G/029-20 / Emergency response to IDA / 52220 Post Direct Selection Direct 241,935.04 Completed 2020-04-20 2020-04-17 2020-04-25 2020-04-17 2020-05-03 2020-04-23 2020-06-02 2020-06-02 Procurement of 5 ambulances COVID-19 CR4/RFQ/D-G/030-20 / Emergency response to Request for Single Stage - One Procurement of 20 IDA / 52220 Post Open - National 472,569.50 Completed 2020-04-25 2020-05-11 2020-06-17 2020-09-08 2020-11-13 COVID-19 Quotations Envelope ambulances CR4/DC/D-G/031-20 / Procurement of syringe Emergency response to UN Agencies IDA / 52220 Post Direct 109,720.00 Completed 2020-04-23 2020-04-23 2020-04-28 2020-04-23 2020-05-02 2020-05-19 2020-06-01 2020-05-20 pumps, laryngoscopes and COVID-19 (Direct) finger pulse-oximeters CR4/DC/D-G/032-20 / Emergency response to IDA / 52220 Post Direct Selection Direct 550,646.20 Completed 2020-05-05 2020-04-30 2020-05-08 2020-05-05 2020-05-14 2020-06-17 2020-09-11 2020-11-17 Procurement of 20 ventilators COVID-19 CR4/DC/D-G/033-20 / Emergency response to Procurement of 2 X-Ray IDA / 52220 Post Direct Selection Direct 109,821.83 Completed 2020-05-06 2020-05-06 2020-05-07 2020-05-08 2020-05-14 2020-05-20 2020-06-13 2020-06-15 COVID-19 mobile units CR4/DC/D-G/034-20 / Emergency response to Procurement of 2 X-Ray IDA / 52220 Post Direct Selection Direct 125,877.16 Completed 2020-05-06 2020-05-06 2020-05-07 2020-05-08 2020-05-14 2020-05-23 2020-06-13 2020-05-26 COVID-19 mobile units Page 2 CR4/RFQ/D-G/035-20 / Emergency response to Request for Single Stage - One Procurement of 2 digital X- IDA / 52220 Post Open - National 326,176.78 Completed 2020-05-08 2020-05-26 2020-07-29 2020-08-24 2020-12-07 COVID-19 Quotations Envelope Ray units CR4/RFQ/D-G/036-20 / Procurement of one Oxygen- Emergency response to Request for Single Stage - One producing Station,including IDA / 52220 Post Open - National 0.00 Canceled 2020-07-18 2020-08-30 2020-12-08 COVID-19 Quotations Envelope installation, start-up and training CR4/RFQ/D-G/037-20 / Procurement of 2 UPS units Emergency response to Request for Single Stage - One IDA / 52220 Post Open - National 35,885.52 Completed 2020-08-14 2020-09-26 2020-09-11 2020-11-10 2020-11-09 for digital X-Rays, including COVID-19 Quotations Envelope installation and start-up CR4/RFQ/D-G/036/1-20 / Procurement of one medical Emergency response to Request for Single Stage - One oxygen-producing station, IDA / 52220 Post Open - National 170,396.35 Completed 2020-09-15 2020-10-30 2021-01-12 2021-02-12 2021-04-21 COVID-19 Quotations Envelope including installation, start-up and training CR4/RFQ/D-G/038-21 / Procurement of medical equipment for blood Under transfusion departments in Emergency response to Request for Single Stage - One IDA / 52220 Post Open - National 0.00 Implementati 2021-05-06 2021-06-20 2021-09-28 Martuni MC and Vayots Dzor COVID-19 Quotations Envelope on regional hospital, including installation, start-up and training CR4/RFQ/D-G/039-21 / Procurement of two donor chairs for blood transfusion Under departments in Martuni MC Emergency response to Request for Single Stage - One IDA / 52220 Post Open - National 0.00 Implementati 2021-05-06 2021-06-20 2021-09-28 and Vayots Dzor regional COVID-19 Quotations Envelope on hospital, including installation, start-up and training NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CR4/A-NCS/020-17 / PR campaign include all the Performance-based layers of information incentives to improve MCH Request for Single Stage - One IDA / 52220 Post Limited 48,056.43 Signed 2017-07-03 2017-07-31 2017-07-17 2017-08-18 2017-12-31 distribution, TV, radio, and NCD services in primary Quotations Envelope electronic media, social care faci networks. Performance-based CR4/A-G/SH/024-18 / incentives to improve MCH Request for Single Stage - One Production and design of PR TF / 14138 Post Open - National 0.00 Canceled 2018-12-03 2018-12-24 2019-02-22 and NCD services in primary Quotations Envelope campaign materials care faci CR4/A-G/SH/025-18 / Performance-based Printing of PR campaign incentives to improve MCH Request for Single Stage - One TF / 13103 Post Open - National 4,698.73 Signed 2019-01-26 2019-02-16 2019-07-07 2019-03-08 materials (booklets, posters and NCD services in primary Quotations Envelope and big-boards) care faci Performance-based CR4/A-G/SH/026-18 / incentives to improve MCH Request for Single Stage - One organization of Flagship TF / 14138 Post Limited 0.00 Canceled 2019-03-23 2019-04-14 2019-05-14 and NCD services in primary Quotations Envelope course care faci Performance-based CR4/A-G/SH/027-19 / incentives to improve MCH Request for Single Stage - One Production and design of PR TF / 14138 Post Open - National 8,483.61 Signed 2019-01-21 2019-02-08 2019-01-31 2019-04-09 and NCD services in primary Quotations Envelope campaign materials care faci CR4/A-NCS/DS/01-19 / Organization of flagship Performance-based (including conference hall, incentives to improve MCH TF / 14138 Post Direct Selection Direct 13,111.55 Signed 2019-04-08 2019-04-05 2019-04-13 2019-04-09 2019-05-10 2019-04-26 2019-05-15 coffee breaks, lunch, and NCD services in primary transportation of guests, care faci formal dinner) Performance-based CR4/A-NCS/DS/02-19 / incentives to improve MCH Organization of flagship TF / 14138 Post Direct Selection Direct 5,354.16 Signed 2019-04-08 2019-04-05 2019-04-13 2019-04-09 2019-05-10 2019-05-16 2019-05-15 and NCD services in primary (Hotel accommodation 1) care faci Performance-based CR4/A-NCS/DS/03-19 / incentives to improve MCH Organization of flagship TF / 14138 Post Direct Selection Direct 1,785.41 Signed 2019-04-08 2019-04-05 2019-04-13 2019-04-09 2019-05-10 2019-05-16 2019-05-15 and NCD services in primary (Hotel accommodation 2) care faci Performance-based CR4/A-NCS/SH/028-19 / incentives to improve MCH Request for Single Stage - One equipment for simultaneous TF / 14138 Post Limited 617.54 Signed 2019-04-10 2019-04-09 2019-04-22 2019-04-18 2019-05-17 and NCD services in primary Quotations Envelope translation care faci Performance-based CR4/A-NCS/SH/034-19 / PR incentives to improve MCH Request for Single Stage - One campaign for 2019 second IDA / 52220 Post Open - National 0.00 Canceled 2019-10-02 2019-10-20 2020-04-17 and NCD services in primary Quotations Envelope and 2020 first semesters care faci Performance-based CR4/A-NCS/SH/035-19 / Pending incentives to improve MCH Request for Single Stage - One Public awareness campaign IDA / 52220 Post Open - National 0.00 Implementati 2019-11-02 2019-11-23 2020-05-21 and NCD services in primary Quotations Envelope for 2020 year on care faci CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 CR4/A1-C/006-14 / ON- SITE SHORT TRAINING COURSE FOR ALL PHC PROVIDERS ON Performance-based NCD MANAGEMENT, Consultant incentives to improve MCH INCLUDING CERVICAL CANCER IDA / 52220 Prior Qualification Open - International 129,954.47 Signed 2014-07-16 2014-07-22 and NCD services in primary SCREENING BASED ON Selection care faci PAPANICOLAOU METHOD AND TRAINING OF LABORATORY PERSONNEL CR4/CQS/B-C/007/1-14 / Performance-based Consultant Author supervision of incentives to improve MCH IDA / 52220 Prior Qualification Open - International 51,524.16 Signed 2014-12-10 2014-12-22 construction of Radiation and NCD services in primary Selection therapy facility care faci CR4/CQS/B-C/007-14 / Performance-based Architectural design of Consultant incentives to improve MCH construction of Radiology IDA / 52220 Prior Qualification Open - International 248,045.31 Signed 2014-12-10 2014-12-22 and NCD services in primary therapy and inpatient therapy Selection care faci facilities CR4/B-C/029-15 / Development of the final and Performance-based Consultant complete sets of architectural incentives to improve MCH IDA / 52220 Prior Qualification Open - International 98,702.90 Signed 2015-07-10 2015-08-20 and engineering design and NCD services in primary Selection documents for construction of care faci Sevan medical center CR4/B-C/029/1-15 / Performance-based Author's supervision during Consultant incentives to improve MCH the civil works for IDA / 52220 Prior Qualification Open - International 10,075.38 Signed 2015-07-10 2015-08-20 and NCD services in primary construction of Sevan medical Selection care faci centre CR4/CQS/B-C/027-15 / Development of the final and Performance-based complete sets of architectural Consultant incentives to improve MCH and engineering design IDA / 52220 Prior Qualification Open - International 85,136.02 Signed 2015-07-30 2015-08-12 and NCD services in primary documents for renovation of Selection care faci Artashat medical center of Ararat marz CR4/B-C/027/1-15 / Performance-based Consultant Author's supervision during incentives to improve MCH IDA / 52220 Prior Qualification Open - International 14,033.49 Signed 2015-07-29 2015-08-12 the renovation of Artashat and NCD services in primary Selection medical center of Ararat marz care faci CR4/LCS/B-C/046-18 / Architectural design for Construction of Martuni MC of Gegharkunik marz and Least Cost IDA / 52220 Hospital Modernization Post Open - National 102,270.51 Signed 2018-06-29 2018-09-10 2018-07-20 2018-08-02 2018-09-02 2018-09-12 2018-09-30 2018-10-01 2018-10-30 2018-10-27 2018-12-04 2019-02-20 2019-01-08 2019-02-20 2019-07-07 adoption of the last for Selection Construction of Vayots dzor MC, including author supervision CR4/CQS/B-C/047-19 / Consultant Technical supervision during IDA / 52220 Hospital Modernization Post Qualification Open - National 52,348.24 Signed 2019-12-09 2019-12-13 2019-12-23 2020-01-15 2020-01-13 2020-02-28 2020-01-20 2020-06-22 2020-01-31 2020-06-30 2022-04-16 the civil works of Martuni MC Selection of Gegharkunik marz INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Performance-based CR4/B-C/014-14 / technical incentives to improve MCH assistant for Civil work IDA / 52220 Prior Direct Selection Direct 27,802.76 Terminated 2014-12-12 and NCD services in primary department care faci Performance-based CR4/B-C/011-14 / TA and incentives to improve MCH IDA / 52220 Prior Direct Selection Direct 28,148.93 Signed 2014-12-12 cordination of civil works and NCD services in primary care faci Performance-based CR4/B-C/016-14 / IT incentives to improve MCH Specialist (network IDA / 52220 Prior Direct Selection Direct 35,294.56 Terminated 2014-12-12 and NCD services in primary administartion) care faci Performance-based CR4/B-C/013-14 / TA and incentives to improve MCH IDA / 52220 Prior Direct Selection Direct 38,810.77 Terminated 2014-12-12 cordination of civil works and NCD services in primary care faci Performance-based CR4/A1-C/009-14 / Legal incentives to improve MCH IDA / 52220 Prior Direct Selection Direct 43,937.04 Terminated 2014-12-12 consultant and NCD services in primary care faci Performance-based CR4/B-C/015-14 / TA on incentives to improve MCH IDA / 52220 Prior Direct Selection Direct 18,195.05 Signed 2014-12-12 procurement and NCD services in primary care faci Performance-based CR4/B-C/017-14 / Medical incentives to improve MCH IDA / 52220 Prior Direct Selection Direct 45,232.90 Terminated 2014-12-12 equipment specialist and NCD services in primary care faci Performance-based CR4/B-C/012-14 / TA and incentives to improve MCH IDA / 52220 Prior Direct Selection Direct 28,148.93 Signed 2014-12-12 cordination of civil works and NCD services in primary care faci CR4/A1-C/010-14 / TA for Performance-based support to project incentives to improve MCH IDA / 52220 Prior Direct Selection Direct 57,340.59 Signed 2014-12-12 management (monitoring and and NCD services in primary evaluation specialist) care faci Page 4 Performance-based Individual CR4/A-C/022-14 / TA on incentives to improve MCH IDA / 52220 Prior Consultant Open 8,272.13 Signed 2015-01-16 2015-01-16 procurement and NCD services in primary Selection care faci CR4/B-C/032-15 / Further follow-up on complains with the ER of design, civil works Performance-based and provision with equipment incentives to improve MCH IDA / 52220 Prior Direct Selection Direct 41.83 Signed 2015-08-11 and furniture activities on the and NCD services in primary site of the establishment of care faci the BMT Unit and Stem Cell Lab in the Hematology center CR4/A-C/044-17 / Monitoring and Evaluation Specialist of the project, responsible for results Performance-based Individual verification with inclusion of incentives to improve MCH IDA / 52220 Post Consultant Direct 43,040.77 Signed 2017-06-29 2017-07-11 2017-06-29 2017-07-11 2017-06-29 2017-07-11 2017-08-01 2017-07-11 2019-11-12 continues work with E-health, and NCD services in primary Selection receiving reports and tracking care faci the errors in the new system, as well as visits to PHC facilities. CR4/IC/A-C/044-17 / Accountant specialist, responsible for activities Performance-based Individual under 5222-AM project and incentives to improve MCH IDA / 52220 Post Consultant Open 3,309.09 Terminated 2017-09-20 2017-09-20 2017-09-28 2017-10-05 2017-10-01 2017-10-08 2017-10-01 2017-10-09 2019-12-27 review/verification of and NCD services in primary Selection payments and supporting care faci documentation under PBF scheme. CR4/IC/B-C/018-19 / IT Individual Specialist (network IDA / 52220 Hospital Modernization Post Consultant Limited 17,681.04 Signed 2019-04-09 2019-04-05 2019-04-12 2019-04-11 2019-04-13 2019-04-16 2019-04-15 2019-04-16 2021-06-30 administrator) Selection CR4/IC/SSS/B-C/030-19 / Individual Selection of Individual IDA / 52220 Hospital Modernization Post Consultant Direct 0.00 Canceled 2019-06-20 2019-06-20 2019-06-20 2019-06-27 2019-06-20 2019-07-03 2019-06-20 2019-12-31 Consultant (medical Selection equipment specialist) Individual CR4/IC/B-C/031-19 / IDA / 52220 Hospital Modernization Post Consultant Limited 33,370.94 Signed 2019-07-15 2019-07-08 2019-07-15 2019-07-09 2019-07-15 2019-07-15 2019-07-22 2019-07-17 2021-06-30 Medical equipment specialist Selection CR4/B-C/IC/033-19 / TA Individual and coordination of civil IDA / 52220 Hospital Modernization Post Consultant Open 1,679.08 Terminated 2019-07-29 2019-07-31 2019-08-29 2019-08-23 2019-09-01 2019-08-23 2019-09-07 2019-09-02 2021-06-30 works Selection CR4/IC/A-C/034-20 / Performance-based Implementation of incentives to improve MCH IDA / 52220 Post Direct Selection Direct 1,658.38 Signed 2020-03-30 2020-04-01 2020-04-05 2020-04-01 2020-04-10 2020-04-01 2020-06-09 procurement activities (COVID- and NCD services in primary 19) care faci Performance-based CR4/IC/A-C/035-20 / incentives to improve MCH IDA / 52220 Post Direct Selection Direct 2,487.22 Signed 2020-04-02 2020-04-02 2020-04-12 2020-04-01 2020-04-19 2020-04-01 2020-06-18 Medical equipment specialist and NCD services in primary care faci CR4/B-C/IC/036-20 / TA Individual and coordination of civil IDA / 52220 Hospital Modernization Post Consultant Open 19,374.66 Signed 2020-07-06 2020-07-09 2020-08-08 2020-09-01 2020-08-11 2020-09-01 2020-08-11 2020-09-01 2022-09-30 works Selection CR4/DC/B-C/048-20 / Change in design for “Martuni IDA / 52220 Hospital Modernization Post Direct Selection Direct 8,534.84 Signed 2021-01-14 2020-12-30 2021-01-24 2021-01-18 2021-01-30 2021-02-25 2021-04-30 Medical Center” CJSC of Gegharkunik Marz of the RA CR4/B-C/IC/037-21 / Individual Under Environmental and social IDA / 52220 Hospital Modernization Post Consultant Open 0.00 2021-05-17 2021-05-17 2021-06-08 2021-06-09 2021-06-11 2022-06-11 Implementation specialist Selection Page 5 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Original: August 19, 2016; Updated Procurement Plan, April 2017 2. Date of General Procurement Notice: Dec 24, 2015 3. Period covered by this procurement plan: The procurement period of project covered from August 2016 – December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB Goods and Non-Consulting Above or equal to All Services US$ 2,000,000 2. NCB - Goods and Non-Consulting Below US$ 2,000,000 None Services 3. Shopping - Goods and Non- Below US$ 100,000 None Consulting Services 4. ICB (Works) Above US$ 10 million All 5. NCB (Works) Below US$ 10 million None 6. Shopping – (Works) Below US$ 100,000 None 2. Prequalification. Bidders for shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: N/A at this stage 5. Any Other Special Procurement Arrangements: 5 ICB works packages are eligible to be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 128.1 8 No Prior of the ICB (Works) Summary 1.8 1 No Prior of the ICB (Goods) Summary 19 3 No Post of the NCB (Works) Summary 4.8 1 No Prior of the ICB (Non- Consultant Services) Summary 0.27 1 No Post of the Shopping (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1,000,000 All QCBS 1. Competitive Methods (Firms) ≥ 300,000 - < None QCBS 1,000,000 1. Competitive Methods (Firms) Below US$ 300,000 None CQS/FBS/LCS 2. Single Source (Firms) All All 3. Individual Above or equal to US$ All 200,000 4. Individual Below US$ 200,000 None 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. 3. Any Other Special Selection Arrangements: 5 QCBS works packages are eligible to be financed under retroactive financing 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 38.1 13 Prior of number of contracts that will be let under QCBS Summary 0.93 3 Prior CQS of number of contracts that will be let under other methods Summary 4.4 7 Prior of number of contracts that will be let under ICS PROCUREMENT Angola : Second Water Sector Institutional Development Project PLAN General Information Country: Angola Bank’s Approval Date of the Original Procurement Plan: 2016-08-10 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151224 GPN Date: 2017-08-07 Project Name: Second Water Sector Institutional Development Project Loan / Credit No: IBRD / 87020, / , COFN / C1560 N Executing Agency(ies): ational Directorate of Water WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 1W3/MALANJE/DNA/16 / Rehabilitation and Expansion Design and construction of Single Stage - One 13,800,000.0 8,096,602.8 2021-02- IBRD / 87020 of Water Supply Production Prior Request for Bids Open - International Signed 2016-09-07 2016-11-02 2017-03-04 2016-11-06 2017-05-27 2017-02-21 2017-06-26 2017-04-18 2017-02-27 2017-06-20 network and home Envelope 0 5 25 and Distribution connections in Malanje 2W3/DUNDO/DNA/16 / Rehabilitation and Expansion Design and construction of Single Stage - One 16,050,000.0 12,836,980. 2021-05- IBRD / 87020 of Water Supply Production Prior Request for Bids Open - International Signed 2016-09-27 2017-04-14 2016-10-02 2017-04-19 2017-02-27 2017-06-23 2017-03-29 2017-09-26 2017-05-04 2017-10-26 network and home Envelope 0 85 03 and Distribution connections in Dundo 3W3/HUAMBO/DNA/16 / Design and construction of Rehabilitation and Expansion Single Stage - One 23,000,000.0 14,455,883. 2020-12- network and home connection IBRD / 87020 of Water Supply Production Prior Request for Bids Open - International Signed 2016-10-12 2016-12-19 2016-10-23 2017-01-17 2017-02-19 2017-03-22 2017-03-21 2017-09-15 2017-05-10 2017-11-07 Envelope 0 26 10 for peri-urban areas in and Distribution Huambo 4W3/LUENA/DNA/16 / Rehabilitation and Expansion Design and construction of Single Stage - One 17,250,000.0 9,849,128.1 2021-05- IBRD / 87020 of Water Supply Production Prior Request for Bids Open - International Signed 2016-10-15 2017-03-29 2017-05-25 2017-03-30 2017-09-20 2017-06-09 2017-10-20 2017-09-14 2017-05-15 2017-10-30 network and home Envelope 0 9 14 and Distribution connections in Luena 5W3/UIGE/DNA/16 / Design Rehabilitation and Expansion Single Stage - One 11,500,000.0 11,011,372. 2021-05- and construction of network IBRD / 87020 of Water Supply Production Prior Request for Bids Open - International Signed 2016-11-14 2017-04-14 2016-11-19 2017-04-19 2017-03-01 2017-06-16 2017-03-31 2017-10-24 2017-05-19 2017-11-13 Envelope 0 76 18 and home connections in Uige and Distribution 7W3/KUITO/DNA/16 / Rehabilitation and Expansion Design and construction of Single Stage - One 4,071,186.0 2020-06- IBRD / 87020 of Water Supply Production Post Request for Bids Open - National 5,000,000.00 Signed 2017-01-16 2017-06-01 2017-01-21 2017-06-01 2017-03-21 2017-07-19 2017-04-20 2017-10-11 2017-05-31 2017-11-16 network and home Envelope 8 01 and Distribution connections in Kuito 9W3/NDALATANDO/DNA/16 / Design and construction for Rehabilitation and Expansion refurbishment of the WTW, Single Stage - One 10,500,000.0 2020-09- / of Water Supply Production Prior Request for Bids Open - International 0.00 Canceled 2017-05-11 2017-05-16 2017-07-17 2017-08-16 2017-09-28 construction of distribution Envelope 0 28 and Distribution centers and 1.6 km trunk mains for Ndalatando 33W3-B/HUAMBO/DAS/17 / Rehabilitation and Expansion Construction of Network and 5,827,776.5 2019-02- IBRD / 87020 of Water Supply Production Prior Direct Selection Direct 5,757,583.00 Signed 2017-05-19 2017-05-24 2017-06-28 2017-07-12 Home Connections for the 8 18 and Distribution City of Huambo-Lot 2 13W3/KUITO/DNA/17 / Rehabilitation and Expansion Supply and installation of 2018-04- IBRD / 87020 of Water Supply Production Post Direct Selection Direct 400,000.00 0.00 Canceled 2017-09-01 2017-09-06 2017-10-11 valves and fittings for Kuito 09 and Distribution Water Supply System 12W3/NDALATANDO/DNA/17 / Supply and installation of Rehabilitation and Expansion Single Stage - One 2018-07- bulk meters and valves for IBRD / 87020 of Water Supply Production Post Request for Bids Open - National 400,000.00 0.00 Canceled 2017-09-12 2017-09-17 2017-10-29 2017-11-28 2018-01-02 Envelope 01 Ndalatando water supply and Distribution system 6W3-R/DAS/17 / Repairs to Rehabilitation and Expansion the Network and Home Single Stage - One 1,619,865.2 2019-08- IBRD / 87020 of Water Supply Production Post Request for Bids Open - National 770,000.00 Signed 2018-10-22 2018-10-30 2018-10-27 2018-10-30 2018-12-08 2018-12-17 2019-01-07 2018-12-21 2019-02-11 2019-02-15 Connections in the City of Envelope 7 10 and Distribution Ndalatando 8W3/NDALATANDO/DNA/16 / Design and construction of a new water source, WTW, Rehabilitation and Expansion Single Stage - One 30,000,000.0 2023-06- pumping station, raw water IBRD / 87020 of Water Supply Production Prior Request for Bids Open - International 0.00 Canceled 2018-05-28 2018-08-09 2018-08-12 2018-06-15 2018-09-03 2018-10-03 2018-11-26 Envelope 0 26 pipeline, distribution centers and Distribution and trunk mains for Ndalatando 9W3/LUBANGO/DNA/18 / Rehabilitation and Expansion Construction of Water Single Stage - One 1,893,993.0 2019-06- IBRD / 87020 of Water Supply Production Post Request for Bids Open - National 700,000.00 Signed 2018-09-06 2019-03-17 2018-09-11 2019-03-29 2018-10-23 2019-05-14 2018-11-22 2019-06-14 2018-12-27 2019-08-12 Production Boreholes in Envelope 8 25 and Distribution Lubango 8W3A/NDALATANDO/DNA/18 / Design and construction of a new water source, WTW, Rehabilitation and Expansion Request for 50,000,000.0 24,354,312. 2020-11- pumping station, raw water IBRD / 87020 of Water Supply Production Prior Open - International Multi Stage Signed 2018-07-10 2018-09-26 2018-10-05 2019-02-27 2018-10-05 2019-04-02 2018-07-25 2018-09-27 2018-12-24 2019-07-02 2019-04-22 2020-03-19 2019-05-27 2020-04-16 Proposals 0 36 17 pipeline, distribution centers and Distribution and trunk mains for Ndalatando 10W3/LUBANGO/DNA/16 / Rehabilitation and Expansion Single Stage - One 11,121,500.0 4,134,900.9 2021-04- Design and Construction of IBRD / 87020 of Water Supply Production Prior Request for Bids Open - International Signed 2018-12-12 2019-03-21 2018-12-17 2019-03-25 2019-03-07 2019-05-13 2019-04-06 2019-06-18 2019-05-11 2019-08-20 Envelope 0 8 30 reservoirs in Lubango and Distribution 45W3/MALANJE/DNA/18 / Rehabilitation and Expansion Single Stage - One 2020-03- Repair works to connections IBRD / 87020 of Water Supply Production Post Request for Bids Open - National 2,500,000.00 0.00 Canceled 2018-10-31 2018-11-05 2019-01-14 2019-02-13 2019-03-20 Envelope 14 in Malanje and Distribution 46W3/CUITO/DNA/18 / Rehabilitation and Expansion Pending Design and Construction of Single Stage - One 2022-04- COFN / C1560 of Water Supply Production Post Request for Bids Open - National 3,500,000.00 0.00 Implementat 2020-06-29 2020-07-04 2020-08-15 2020-09-14 2020-10-19 Network and Household Envelope 12 and Distribution ion Connections in Cuito-Phase 2 Page 1 44W3/LUBANGO/DNA/18 / Rehabilitation and Expansion Under Design and Construction of Single Stage - One 2022-01- COFN / C1560 of Water Supply Production Post Request for Bids Open - National 3,500,000.00 0.00 Implementat 2020-04-16 2020-11-03 2020-04-21 2020-11-03 2020-06-02 2021-03-19 2020-07-02 2020-08-06 Network and Household Envelope 28 and Distribution ion Connections in Lubango 6W3/NAMIBE/DNA/16 / Rehabilitation and Expansion Design and construction of Single Stage - One 3,344,889.8 2023-11- COFN / C1560 of Water Supply Production Post Request for Bids Open - International 9,000,000.00 Signed 2019-05-23 2019-10-31 2019-05-28 2019-10-30 2019-09-10 2020-05-19 2019-10-10 2020-06-30 2019-11-16 2020-08-31 network and home Envelope 3 10 and Distribution connections in Namibe 11W3/LUBANGO/DNA/16 / Rehabilitation and Expansion Pending Single Stage - One 2022-02- Design and construction of COFN / C1560 of Water Supply Production Post Request for Bids Open - National 8,000,000.00 0.00 Implementat 2020-10-30 2020-11-04 2020-12-16 2021-01-15 2021-02-19 Envelope 19 boreholes in Lubango and Distribution ion 74W3/UIGE/19 / Design and construction of a new water Rehabilitation and Expansion source, WTW, pumping Request for 35,000,000.0 Under 2023-05- COFN / C1560 of Water Supply Production Prior Open - International Multi Stage 0.00 2019-07-25 2019-10-10 2019-10-20 2020-04-28 2019-10-20 2020-06-04 2019-08-09 2019-10-15 2020-01-08 2020-11-12 2020-05-06 2020-06-10 station, raw water pipeline, Proposals 0 Review 26 and Distribution distribution centers and trunk mains for Uige 15W3/NDALATANDO/DNA/20 / Design and Construction of Rehabilitation and Expansion Under Single Stage - One 15,500,000.0 2021-03- Network and home COFN / C1560 of Water Supply Production Prior Request for Bids Open - International 0.00 Implementat 2020-05-19 2020-08-12 2020-05-24 2020-08-25 2020-07-05 2020-11-13 2020-08-04 2021-05-25 2020-09-08 Envelope 0 07 connections in Ndalatando and Distribution ion Lot 2 16W3/UIGE/DNA/20 / Design Rehabilitation and Expansion Under Single Stage - One 14,500,000.0 2021-03- and Construction of Network COFN / C1560 of Water Supply Production Prior Request for Bids Open - International 0.00 Implementat 2020-05-25 2020-07-21 2020-05-30 2020-07-27 2020-07-11 2020-11-11 2020-08-10 2021-06-23 2020-09-14 Envelope 0 13 and home connections in Uige and Distribution ion 17W3/HUAMBO/DNA/20 / Rehabilitation and Expansion Pending Single Stage - One 2021-06- Remedial of Water Supply at COFN / C1560 of Water Supply Production Post Request for Bids Open - National 3,000,000.00 0.00 Implementat 2020-08-31 2020-09-05 2020-10-17 2020-11-16 2020-12-21 Envelope 19 Huambo and Distribution ion 18W3/DNA/20 / Remedial of Rehabilitation and Expansion Pending Single Stage - One 2021-07- Water Supply Systems at Uige, COFN / C1560 of Water Supply Production Post Request for Bids Open - National 6,000,000.00 0.00 Implementat 2020-09-14 2020-09-19 2020-10-31 2020-11-30 2021-01-04 Envelope 03 Malange, Lubango and Cuito and Distribution ion 14W3/N’DALATANDO/DNA/2 0 / DESIGN AND CONSTRUCTION OF THE Rehabilitation and Expansion Under EXPANSION AND Single Stage - One 2021-10- COFN / C1560 of Water Supply Production Post Request for Bids Open - International 5,000,000.00 0.00 Implementat 2020-12-31 2021-01-08 2021-01-05 2021-01-08 2021-02-16 2021-04-01 2021-03-18 2021-04-22 REHABILITATION OF THE Envelope 19 and Distribution ion EXISTING MUCARI BULK WATER SUPPLY SYSTEM OF THE CITY OF N’DALATANDO 14W3/NDALATANDO/DNA/20 / Design and Construction of the Expansion and Rehabilitation and Expansion Single Stage - One 2021-03- Rehabilitation of the Existing COFN / C1560 of Water Supply Production Prior Request for Bids Open - International 5,000,000.00 0.00 Canceled 2020-05-25 2020-05-30 2020-07-11 2020-08-10 2020-09-14 Envelope 13 Mucari Bulk Water Supply and Distribution System of the city of Ndalatando 109W3/NDALATANDO/21 / Design and Construction of National distribution network and Rehabilitation and Expansion Procurement Pending Single Stage - One 2022-06- household connections in city IBRD / 87020 of Water Supply Production Post Request for Bids Open - National Document - 1 7,008,000.00 0.00 Implementat 2021-08-15 2021-08-20 2021-10-01 2021-10-31 2021-12-05 Envelope 03 of Lucala and rural and Distribution Envelope process ion communities between Lucala (Non Bank-SPD) and N’Dalatando GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 4G4/DNA/16 / Implementation of a Financial Management and Engineering Request for Single Stage - One / Post Limited 70,000.00 0.00 Canceled 2017-08-08 2017-10-03 2018-04-01 Management System Support Quotations Envelope (Primavera software) 47G1/CITIES/DNA/18 / Water Water Supply Institutional Single Stage - One meters, pipes valves and IBRD / 87020 Strengthening and Capacity Prior Request for Bids Open - National 800,000.00 3,189,329.35 Signed 2018-07-20 2018-10-16 2018-07-25 2018-10-16 2018-09-05 2018-12-04 2018-10-05 2019-02-28 2018-11-09 2019-06-10 2019-05-08 Envelope fittings for six cities Development 53G1/CITIES/DNA/18 / Water Supply Institutional Workstations and printers for Single Stage - One IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 300,000.00 370,492.32 Signed 2018-05-30 2018-11-09 2018-06-04 2019-03-18 2018-07-19 2019-04-26 2018-08-18 2019-08-14 2018-09-22 2019-11-18 2019-03-21 Utilities in Huila, Malanje and Envelope Development Cuanza Norte 2G4/DNA/16 / Computers Rehabilitation and Expansion Request for Single Stage - One and IT equipment for the IBRD / 87020 of Water Supply Production Post Limited 100,000.00 97,808.86 Signed 2019-02-17 2018-10-23 2019-04-14 2018-11-26 2019-10-11 Quotations Envelope Project and Distribution 3G4/DNA/16 / Furniture Management and Engineering Request for Single Stage - One IBRD / 87020 Post Limited 100,000.00 63,269.83 Signed 2019-03-05 2018-10-26 2019-04-30 2018-11-28 2019-10-27 shopping Support Quotations Envelope 71G3/UIGE/DNA/18 / Power Rehabilitation and Expansion Pending Request for Single Stage - One Transformer for Uige Water IBRD / 87020 of Water Supply Production Post Limited 50,000.00 0.00 Implementati 2019-01-28 2019-03-25 2019-09-21 Quotations Envelope Supply System and Distribution on 70CS2/INRH/18 / Purchase and installation of 15 remote satellite communication Single Stage - One COFN / C1560 Water Resource Management Post Request for Bids Open - National 750,000.00 0.00 Canceled 2020-05-13 2020-05-18 2020-06-29 2020-07-29 2020-09-02 2021-03-01 equipment and Envelope meteorological sensors for hydrometric stations 1G4/DNA/16 / Education and Water Supply Institutional Single Stage - One laboratory equipment for COFN / C1560 Strengthening and Capacity Post Request for Bids Open - International 1,800,000.00 0.00 Canceled 2020-09-01 2020-09-06 2020-10-18 2020-11-17 2021-01-15 2022-01-15 Envelope Onga Zanga training center Development 48/G1/CITIES/DNA/18 / Water Supply Institutional Single Stage - One Workshop and maintenance IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 250,000.00 0.00 Canceled 2018-06-20 2018-06-25 2018-08-06 2018-09-05 2018-10-10 2019-04-08 Envelope equipment Development Page 2 5G4/DNA/20 / Procurement Management and Engineering Request for Single Stage - One of TOMPRO Accounting IBRD / 87020 Post Limited 50,000.00 51,203.21 Signed 2020-02-16 2020-03-10 2020-04-26 2020-05-25 2020-07-26 Support Quotations Envelope Software 6G4/UCP/20 / Procurement Water Supply Institutional of Computers for Young Request for Single Stage - One IBRD / 87020 Strengthening and Capacity Post Limited 100,000.00 49,820.29 Signed 2020-02-14 2020-03-11 2020-04-10 2020-04-15 2020-10-07 Professionals and FCMU Quotations Envelope Development Consultants 54G2/INRH/20 / Under Single Stage - One Procurement of ArGis software COFN / C1560 Water Resource Management Post Request for Bids Open - National 120,000.00 76,393.65 Implementati 2020-03-02 2020-04-28 2020-03-07 2020-04-28 2020-04-18 2020-05-27 2020-05-18 2020-08-14 2020-06-22 2020-12-19 Envelope license and Angola Database on 55G2/INRH/20 / Under Procurement of Hydrometric Single Stage - One COFN / C1560 Water Resource Management Post Request for Bids Open - National 750,000.00 584,755.61 Implementati 2020-03-02 2020-04-15 2020-03-09 2020-04-15 2020-04-20 2020-06-02 2020-05-20 2020-08-13 2020-06-24 2020-12-21 Equipment and Remote Envelope on Connection to the Database 7G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 5,454.75 4,786.20 Completed 2020-04-09 2020-04-08 2020-04-14 2020-04-07 2020-05-19 2020-04-15 2020-11-15 2020-07-06 Procurement of Motorcycles Development 9G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 9,273.08 8,263.12 Completed 2020-04-12 2020-06-02 2020-04-17 2020-04-08 2020-05-22 2020-06-11 2020-11-18 2020-09-23 Operation and maintenance Development 10G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection 13,182.32 11,698.34 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-13 2020-05-07 2020-04-15 2020-11-03 2020-04-22 Procurement of pumps, Development reservoirs and accessories 11G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 7,091.18 6,265.20 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-07 2020-05-22 2020-04-21 2020-11-18 2020-05-21 Procurement of Chemicals Development 12G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 5,454.75 4,860.66 Signed 2020-04-12 2020-04-21 2020-04-17 2020-04-13 2020-05-22 2020-05-07 2020-11-18 Health and Safety Materials Development 13G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,727.38 2,392.88 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-22 2020-04-16 2020-11-18 2020-05-25 Health and Safety Materials Development 15G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 69,376.83 61,599.83 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-22 2020-04-14 2020-11-18 2020-05-05 Chemicals and laboratory Development reagents 16G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 16,339.54 10,460.36 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-22 2020-04-17 2020-11-18 2020-05-27 pumps, reservoirs and Development accessories 17G1/BIE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 5,454.75 4,786.20 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-22 2020-04-14 2020-11-18 2020-06-16 motorcycles Development 18G1/BIE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,727.38 2,393.10 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-22 2020-04-14 2020-11-18 2020-05-25 Health and Safety Materials Development 20G1/BIE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection 46,342.68 40,662.76 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-07 2020-04-15 2020-11-03 2020-06-02 Chemicals Development 21G1/BIE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 54,068.20 47,363.00 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-22 2020-04-17 2020-11-18 2020-05-21 Pumps Development 22G1/MALANJE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 5,454.75 4,778.22 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-13 2020-05-22 2020-04-17 2020-11-18 2020-05-21 of motorcycles Development 23G1/MALANJE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,727.38 2,515.11 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-13 2020-05-22 2020-04-17 2020-11-18 2020-05-18 of Health and Safety Materials Development 25G1/MALANJE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection 14,250.54 12,548.89 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-13 2020-05-07 2020-04-20 2020-11-03 2020-06-25 of Chemicals Development 26G1/MALANJE/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 35,600.66 31,008.69 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-13 2020-05-22 2020-04-17 2020-11-18 2020-09-15 of maintenance materials Development 27G1/HUAMBO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 5,454.75 4,804.80 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-30 2020-05-22 2020-05-18 2020-11-18 2020-06-12 of motorcycles Development 32G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 5,454.75 4,804.80 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-22 2020-04-15 2020-11-18 2020-05-27 motorcycles Development 28G1/HUAMBO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 6,363.88 2,392.39 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-30 2020-05-22 2020-05-14 2020-11-18 2020-06-15 of Health and Safety Materials Development 33G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,727.38 2,400.64 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-22 2020-05-21 2020-11-18 2020-07-10 Health and Safety Materials Development 30G1/HUAMBO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection 83,637.74 72,066.19 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-30 2020-05-07 2020-04-14 2020-11-03 2020-05-25 of Chemicals Development Page 3 31G1/HUAMBO/20 / Covid Water Supply Institutional 19 Emergency - Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 36,115.02 31,811.78 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-30 2020-05-22 2020-05-14 2020-11-18 2020-09-04 of maintenance materials Development 36G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection 88,821.81 78,372.94 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-07 2020-04-13 2020-11-03 2020-05-05 pumps and spare parts Development 37G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection 71,877.65 63,210.84 Completed 2020-04-12 2020-04-08 2020-04-17 2020-04-10 2020-05-07 2020-04-13 2020-11-03 2020-10-26 electrical repair materials Development 56G2/INRH/20 / Pending Procurement of Angola COFN / C1560 Water Resource Management Post Direct Selection Direct 50,000.00 0.00 Implementati 2020-05-04 2020-05-09 2020-06-13 2020-12-10 Database on 57G1/UIGE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 12,600.00 9,278.99 Signed 2020-05-18 2020-05-14 2020-05-23 2020-06-17 2020-06-27 2020-07-13 2020-12-24 Laboratory Reagents Development 58G1/UIGE/20 / Covid-19 Emergency – Procurement of Water Supply Institutional accessories and materials for COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 63,000.00 52,807.57 Completed 2020-05-18 2020-05-14 2020-05-23 2020-04-07 2020-06-27 2020-06-25 2020-12-24 2020-09-02 the repair of water supply Development network 59G1/HUILA/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 44,000.00 36,913.47 Completed 2020-05-19 2020-05-14 2020-05-24 2020-05-29 2020-06-28 2020-06-23 2020-12-25 2020-09-05 Laboratory Reagents Development 60G1/HUILA/20 / Covid 19 Emergency - Procurement of Water Supply Institutional accessories and materials for COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 80,700.00 67,595.81 Completed 2020-05-20 2020-05-14 2020-05-25 2020-05-29 2020-06-29 2020-07-29 2020-12-26 2020-09-30 the repair of water supply Development network 62G1/NAMIBE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 87,600.00 73,414.98 Completed 2020-05-19 2020-05-14 2020-05-24 2020-04-18 2020-06-28 2020-06-12 2020-12-25 2020-08-19 Chemicals for water treatment Development 63G1/NAMIBE/20 / Covid 19 Emergency - Procurement of Water Supply Institutional accessories and materials for COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 90,790.00 76,091.19 Completed 2020-05-19 2020-05-14 2020-05-24 2020-04-23 2020-06-28 2020-07-29 2020-12-25 2020-10-16 the repair of water supply Development network 64G1/NAMIBE/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 82,750.00 69,336.37 Completed 2020-05-19 2020-05-14 2020-05-24 2020-04-18 2020-06-28 2020-06-12 2020-12-25 2020-10-16 Laboratory reagents Development 65G1/MOXICO/20 / Covid- Water Supply Institutional 19 Emergency – Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,800.00 2,174.75 Completed 2020-05-20 2020-05-14 2020-05-25 2020-04-22 2020-06-29 2020-06-12 2020-12-26 2020-08-21 of Health and Safety Development equipment 68G1/MOXICO/20 / Covid 19 Emergency - Procurement of Water Supply Institutional accessories and materials for COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 21,850.00 18,156.05 Completed 2020-05-21 2020-05-14 2020-05-26 2020-05-11 2020-06-30 2020-06-25 2020-12-27 2020-09-07 the repair of water supply Development network 69G1/MOXICO/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 24,000.00 19,947.88 Completed 2020-05-21 2020-05-14 2020-05-26 2020-04-22 2020-06-30 2020-06-12 2020-12-27 2020-09-03 an electric generator Development 70G1/MOXICO/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 5,600.00 4,688.73 Completed 2020-05-21 2020-05-14 2020-05-26 2020-05-01 2020-06-30 2020-06-12 2020-12-27 2020-08-28 accessories for the existing Development generator 66G1/MOXICO/20 / Covid- Water Supply Institutional 19 Emergency – Procurement COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,800.00 0.00 Canceled 2020-05-20 2020-05-25 2020-06-29 2020-12-26 of Motorcycles Development 67G1/MOXICO/20 / Covid 19 Water Supply Institutional Emergency - Procurement of COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 87,300.00 0.00 Canceled 2020-05-21 2020-05-26 2020-06-30 2020-12-27 chemicals for water treatment Development 8G1/NDALATANDO/20 / Water Supply Institutional Covid 19 Emergency - COFN / C1560 Strengthening and Capacity Post Direct Selection Direct 2,727.38 0.00 Canceled 2020-04-12 2020-04-17 2020-05-22 2020-11-18 Procurement of Health and Development Safety Materials 71G1/COVID EMERGENCY Water Supply Institutional Under /21 / Covid 19 Emergency - Single Stage - One IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 625,000.00 0.00 Implementati 2021-03-29 2021-04-15 2021-04-03 2021-04-15 2021-05-15 2021-05-25 2021-06-14 2021-07-19 2022-01-15 Procurement of Chemicals and Envelope Development on reagents 73G1/COVID EMERGENCY/20 / Covid 19 Emergency - Water Supply Institutional Under Single Stage - One Procurement of Office IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 360,000.00 0.00 Implementati 2021-03-29 2021-04-22 2021-04-03 2021-04-22 2021-05-15 2021-06-14 2021-07-19 2022-01-15 Envelope supplies and communication Development on equipment 74G1/COVID EMERGENCY/20 Water Supply Institutional Under / Covid 19 Emergency - Single Stage - One IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 620,000.00 0.00 Implementati 2021-03-29 2021-04-22 2021-04-03 2021-04-22 2021-05-15 2021-06-14 2021-07-19 2022-01-15 Procurement of Meters, Envelope Development on pumps and network repair materials 75G1/COVID EMERGENCY Water Supply Institutional Pending Request for Single Stage - One /20 / Covid 19 Emergency - IBRD / 87020 Strengthening and Capacity Post Limited 115,000.00 0.00 Implementati 2021-04-03 2021-05-29 2021-11-25 Quotations Envelope Procurement of Motorcycles Development on 72G1/COVID EMERGENCY/20 / Covid 19 Emergency - Procurement of Health and Water Supply Institutional Pending Request for Single Stage - One Protection against Covid IBRD / 87020 Strengthening and Capacity Post Limited 140,000.00 0.00 Implementati 2021-04-03 2021-05-29 2021-11-25 Quotations Envelope (Rubber gloves, Hand Development on sanitizers, face masks, disinfectants etc.) Page 4 78G1/IRSEA/21 / Pending Request for Single Stage - One Procurement of Computers IBRD / 87020 Water Resource Management Post Limited 90,000.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 Quotations Envelope and IT equipment to IRSEA on Pending 67G2/INRH/21 / Purchase of Request for Single Stage - One IBRD / 87020 Water Resource Management Post Limited 20,000.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 Boat and accessories for INRH Quotations Envelope on 91G4/UCP/21 / Procurement Pending Management and Engineering Request for Single Stage - One of 2 Support Vehicles to FCMU- IBRD / 87020 Post Limited 70,000.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 Support Quotations Envelope WB / AFD on 92G4/UCP/21 / Procurement Pending Management and Engineering Request for Single Stage - One of IT Equipment for the IBRD / 87020 Post Limited 50,000.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 Support Quotations Envelope Project on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 56NC1/UIGE/DNA/18 / Water Supply Institutional Single Stage - Two Management Support IBRD / 87020 Strengthening and Capacity Prior Request for Bids Open - International 4,500,000.00 5,681,279.92 Signed 2018-06-01 2018-11-21 2018-08-17 2019-03-29 2018-08-17 2019-05-29 2018-06-06 2018-11-23 2018-10-26 2019-08-20 2019-01-08 2019-12-12 2019-02-12 2020-02-26 2022-02-11 Envelope Services Contract for Uige Development 11CS1/DAS/18 / Operation Water Supply Institutional and Management of Kuito and IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 1,135,505.42 1,209,504.20 Signed 2018-06-06 2018-06-12 2018-06-11 2018-07-01 2018-06-29 2018-12-28 Kunje Water Supply System Development 93CS1/DAS/18 / Operation Water Supply Institutional and Management of Huambo IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 1,091,728.00 1,470,480.00 Signed 2018-06-06 2018-06-12 2018-06-11 2018-07-01 2018-06-29 2018-12-28 Water Supply System Development 20CS1/DAS/18 / Operation Water Supply Institutional and Management of Malanje IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 835,532.08 1,019,169.96 Signed 2018-06-06 2018-06-12 2018-06-11 2018-07-01 2018-06-18 2018-12-28 Water Supply System Development 94CS1/DAS/18 / Operation Water Supply Institutional and Management of Uige IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 934,905.00 1,202,407.00 Signed 2018-06-06 2018-06-13 2018-06-11 2018-07-01 2018-06-29 2018-12-28 Water Supply System Development 59CS1/DAS/15 / Operation Water Supply Institutional and Management of Lubango IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 2,235,904.99 2,200,875.50 Signed 2018-06-06 2018-06-12 2018-06-11 2018-07-01 2018-06-29 2018-12-28 Water Supply System Development 95CS1/DAS/18 / Operation Water Supply Institutional and Management of IBRD / 87020 Strengthening and Capacity Post Direct Selection Direct 782,000.00 1,180,071.55 Signed 2018-08-20 2018-04-03 2018-08-25 2018-07-23 2018-09-14 2018-08-21 2019-03-13 N´dalatando Water Supply Development System 58NC1/NDALATANDO/DNA/1 Water Supply Institutional 8 / Management Support Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids Open - International 6,000,000.00 7,032,202.49 Signed 2019-05-02 2019-07-15 2019-05-07 2019-07-16 2019-06-18 2019-09-25 2019-08-31 2020-03-02 2019-10-05 2020-07-24 2024-09-08 Services Contract for Envelope Development Ndalatando 1NC1/LUENA/DNA/16 / Water Supply Institutional Single Stage - Two Management Contract for COFN / C1560 Strengthening and Capacity Post Request for Bids Open - International 800,000.00 938,762.16 Signed 2019-07-24 2019-06-12 2019-07-29 2019-06-12 2019-09-30 2019-08-12 2019-12-13 2019-09-04 2020-01-17 2019-12-09 2023-02-14 Envelope Luena Development 54NC1/CUITO/DNA/18 / Water Supply Institutional Single Stage - Two Management Support COFN / C1560 Strengthening and Capacity Prior Request for Bids Open - International 6,000,000.00 9,117,817.16 Under Review 2019-05-06 2019-08-09 2019-05-11 2019-08-22 2019-06-22 2019-10-02 2019-09-04 2019-12-23 2019-10-09 2020-07-02 2024-09-12 Envelope Services Contract for Cuito Development 55NC1/HUAMBO/DNA/18 / Water Supply Institutional Single Stage - Two Management Support COFN / C1560 Strengthening and Capacity Prior Request for Bids Open - International 6,000,000.00 5,557,479.33 Signed 2019-05-13 2019-07-12 2019-05-18 2019-07-17 2019-06-29 2019-09-18 2019-09-11 2019-12-12 2019-10-16 2020-02-20 2024-09-19 Envelope Services Contract for Huambo Development 57NC1/MALANJE/DNA/18 / Water Supply Institutional Single Stage - Two Management Support COFN / C1560 Strengthening and Capacity Prior Request for Bids Open - International 6,000,000.00 6,718,801.92 Signed 2019-05-17 2019-06-18 2019-05-22 2019-06-19 2019-07-03 2019-09-11 2019-09-15 2019-12-12 2019-10-20 2020-05-28 2020-04-17 Envelope Services Contract for Malanje Development 73NC1/LUBANGO/18 / Water Supply Institutional Single Stage - Two Management Support COFN / C1560 Strengthening and Capacity Prior Request for Bids Open - International 6,000,000.00 0.00 Canceled 2019-06-03 2019-06-08 2019-07-20 2019-10-02 2019-11-06 2024-10-10 Envelope Services Contract for Lubango Development 78NC1/HUILA/19 / Water Supply Institutional Single Stage - Two Management Support COFN / C1560 Strengthening and Capacity Prior Request for Bids Open - International 6,000,000.00 6,311,159.00 Signed 2019-08-05 2019-08-16 2019-08-10 2019-08-22 2019-09-21 2019-10-16 2019-12-04 2020-03-09 2020-01-08 2020-07-30 2024-12-12 Envelope Services Contract for Huíla Development Province Management and Engineering Request for Single Stage - One 103CS1/UCP/20 / Translator COFN / C1560 Post Limited 200,000.00 15,409.23 Signed 2020-05-29 2020-05-12 2020-07-24 2020-06-12 2021-07-04 Support Quotations Envelope 105CS3/NDALATANDO/20 / Rehabilitation and Expansion Demining of the sites for the COFN / C1560 of Water Supply Production Post Direct Selection Direct 106,000.00 89.54 Signed 2020-07-26 2020-07-30 2020-07-31 2020-07-15 2020-09-04 2020-09-03 2021-03-03 new bulk water supply system and Distribution in Ndalatando 56ANC1/UIGE/20 / Water Supply Institutional Management Support Services IBRD / 87020 Strengthening and Capacity Post Direct Selection Direct 204,000.00 347,128.21 Signed 2020-10-30 2020-11-18 2020-11-04 2020-11-19 2020-12-09 2021-02-03 2021-06-07 for Uige Water and Sanitation Development Utility CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1CS3/DNA/16 / Design checking and works Rehabilitation and Expansion Quality And Cost- Supervision of Network and IBRD / 87020 of Water Supply Production Prior Open - International 3,000,000.00 1,948,055.93 Signed 2016-08-16 2016-08-19 2016-09-06 2016-10-20 2016-09-06 2016-11-17 2016-10-20 2016-12-17 2017-01-18 2017-01-21 2017-04-11 2017-02-25 2017-04-17 2020-09-25 Based Selection Home Connections for and Distribution Peirurban areas of Malanje Page 5 2CS3/DNA/16 / Design Rehabilitation and Expansion checking and works Quality And Cost- IBRD / 87020 of Water Supply Production Prior Open - International 3,200,000.00 2,594,875.88 Signed 2016-08-16 2016-08-15 2016-10-03 2016-08-22 2016-11-10 2016-11-08 2017-01-24 2016-12-19 2017-02-23 2017-04-17 2017-03-30 2017-08-02 2017-05-04 2017-08-07 2021-06-04 Supervision of Network and Based Selection and Distribution Home Connections for Dundo 3CS3/DNA/16 / Design checking and works Rehabilitation and Expansion Quality And Cost- Supervision of Network and IBRD / 87020 of Water Supply Production Prior Open - International 3,000,000.00 2,192,328.79 Under Review 2016-08-17 2016-08-15 2016-10-04 2016-08-23 2016-11-10 2016-11-08 2017-01-30 2016-12-16 2017-03-01 2017-01-18 2017-04-05 2017-04-18 2017-05-10 2017-04-24 2020-12-10 Based Selection Home Connections for and Distribution Huambo (1st phase) 4CS3/DNA/16 / Design Rehabilitation and Expansion checking and works Quality And Cost- IBRD / 87020 of Water Supply Production Prior Open - International 3,000,000.00 1,815,313.53 Signed 2016-08-18 2016-08-13 2016-10-05 2016-08-22 2016-11-18 2016-11-08 2017-02-02 2016-12-15 2017-03-04 2017-02-08 2017-04-08 2017-05-30 2017-05-13 2017-06-05 2020-12-14 Supervision of Network and Based Selection and Distribution Home Connections for Luena 5CS3/DNA/16 / Design Rehabilitation and Expansion checking and works Quality And Cost- IBRD / 87020 of Water Supply Production Prior Open - International 2,700,000.00 2,281,892.77 Under Review 2016-08-19 2016-08-19 2016-10-06 2016-08-23 2016-11-19 2016-11-08 2017-02-08 2016-12-20 2017-03-10 2017-04-11 2017-04-14 2017-07-28 2017-05-19 2017-08-01 2020-12-21 Supervision of Network and Based Selection and Distribution Home Connections for Uige 6CS3/DNA/16 / Design checking and works Rehabilitation and Expansion Quality And Cost- Supervision of Network and IBRD / 87020 of Water Supply Production Prior Open - International 2,900,000.00 2,060,259.00 Signed 2016-08-20 2016-08-19 2016-10-07 2016-08-23 2016-11-20 2016-11-09 2017-02-14 2016-12-22 2017-03-16 2017-07-26 2017-04-20 2018-05-04 2017-05-25 2018-05-21 2020-12-25 Based Selection Home Connections for and Distribution Namibe 7CS3/DNA/16 / Design checking and works Rehabilitation and Expansion Quality And Cost- Supervision of Network and IBRD / 87020 of Water Supply Production Prior Open - International 2,400,000.00 994,220.00 Signed 2016-08-21 2016-08-19 2016-10-08 2016-08-23 2016-11-21 2016-11-08 2017-02-20 2016-12-21 2017-03-22 2017-08-16 2017-04-26 2017-11-07 2017-05-31 2017-11-13 2020-12-28 Based Selection Home Connections for Kuito and Distribution (1st phase) 8CS3/NDALATANDO/DNA/16 / Design checking and works Rehabilitation and Expansion supervision for the Quality And Cost- COFN / C1560 of Water Supply Production Prior Open - International 3,300,000.00 2,795,189.68 Signed 2017-02-01 2018-11-08 2017-02-22 2018-11-13 2017-04-07 2019-06-11 2017-06-05 2019-09-03 2017-07-05 2019-10-23 2017-08-09 2020-01-06 2017-09-13 2020-02-12 2020-09-14 construction of a new water Based Selection and Distribution source and pipeline in Ndalatando 10CS3/LUBANGO/DNA/16 / Rehabilitation and Expansion Design checking and works Quality And Cost- IBRD / 87020 of Water Supply Production Prior Open - International 1,500,000.00 736,287.70 Signed 2017-03-03 2018-05-04 2017-05-18 2018-05-14 2017-07-01 2018-12-12 2017-08-28 2019-02-19 2017-09-27 2019-04-12 2017-11-01 2019-06-10 2017-12-06 2019-06-27 2020-12-07 Supervision of Construction of Based Selection and Distribution reservoirs in Lubango 12CS2/INRH/DNA/16 / TA to develop Integrated Basin Quality And Cost- / Water Resource Management Prior Open - International 2,200,000.00 0.00 Canceled 2017-09-01 2016-10-13 2017-11-03 2016-10-19 2017-12-17 2018-03-05 2018-04-04 2018-05-09 2018-06-13 2019-06-13 Management Plan for River Based Selection Basins in Benguela 13CS2/INRH/DNA/16 / TA to develop Integrated Basin Quality And Cost- / Water Resource Management Prior Open - International 2,200,000.00 0.00 Canceled 2017-02-03 2016-09-06 2017-04-24 2016-10-19 2017-06-07 2017-08-06 2017-09-05 2017-10-10 2017-11-14 2018-11-14 Management Plan for Keve e Based Selection Longa Basins 14CS4/NAMIBE/DNA/16 / Management and Engineering Quality And Cost- Salt water intrusion study at / Post Open - International 500,000.00 0.00 Canceled 2017-06-01 2017-08-01 2017-09-14 2017-11-12 2017-12-12 2018-01-16 2018-09-20 2019-09-20 Support Based Selection Namibe 15CS1/IRSEA/DNA/16 / TA Water Supply Institutional Quality And Cost- Water and Electricity Regulator IBRD / 87020 Strengthening and Capacity Prior Open - International 6,300,000.00 5,051,935.58 Signed 2017-02-08 2018-05-07 2017-04-27 2018-06-15 2017-06-10 2018-12-07 2017-08-09 2019-02-20 2017-09-08 2019-04-02 2017-10-13 2019-05-10 2017-11-17 2019-05-28 2020-12-17 Based Selection (IRSEA) Development 16CS1/DNA/17 / External Management and Engineering Least Cost IBRD / 87020 Post Open - International 130,000.00 64,705.88 Signed 2017-04-17 2017-04-01 2017-05-08 2017-05-10 2017-03-20 2017-06-07 2017-05-22 2017-07-07 2017-10-17 2017-08-11 2017-11-10 2017-09-15 2017-11-29 2021-09-14 Audit Support Selection 35CS4/DNA/17 / Project Management and Engineering Least Cost IBRD / 87020 Post Open - International 250,000.00 171,122.99 Signed 2017-10-18 2017-11-08 2017-11-14 2017-12-22 2017-12-21 2018-01-19 2018-01-31 2018-02-18 2018-03-25 2018-04-09 2018-04-29 2018-06-01 2021-04-13 Internal Audit Support Selection 39CS1/DNA/17 / AUDIT OF FINANCIAL STATEMENTS FOR Water Supply Institutional Least Cost SIX BENEFICIARY WATER IBRD / 87020 Strengthening and Capacity Post Open - International 200,000.00 232,192.51 Signed 2018-01-24 2018-01-25 2018-02-14 2018-01-25 2018-04-06 2018-02-23 2018-05-04 2018-03-27 2018-06-03 2018-04-23 2018-07-08 2018-05-10 2018-08-12 2018-06-08 2021-09-10 Selection SUPPLY AND SANITATION Development UTILITIES 42CS2/TA/INRH/17 / Technical Assistance to INRH Quality And Cost- IBRD / 87020 Water Resource Management Prior Open - International 3,000,000.00 2,028,160.74 Signed 2018-03-30 2018-06-05 2018-04-20 2018-06-13 2018-06-03 2018-11-30 2018-07-01 2019-02-18 2018-07-31 2019-05-30 2018-09-04 2019-08-06 2018-10-09 2019-08-26 2021-10-08 (National Water Resources Based Selection Institute) 49CS3/UIGE/DNA/18 / Rehabilitation and Expansion Environmental and Social Quality And Cost- IBRD / 87020 of Water Supply Production Post Open - National 200,000.00 117,948.37 Signed 2018-07-03 2018-11-20 2018-07-24 2018-12-10 2018-09-06 2019-03-26 2018-10-04 2019-05-23 2018-11-03 2019-05-31 2018-12-08 2019-07-11 2019-01-12 2019-08-26 2020-01-12 Impact Assessment for Uige Based Selection and Distribution Water Supply System 60CS1/DNA/18 / Review of Water Supply Institutional the Legal and Institutional Quality And Cost- IBRD / 87020 Strengthening and Capacity Prior Open - International 663,000.00 568,864.64 Signed 2018-05-16 2018-05-14 2018-06-06 2018-06-14 2018-07-20 2019-01-16 2018-08-17 2019-03-21 2018-09-16 2019-06-18 2018-10-21 2019-08-09 2018-11-25 2019-09-02 2019-08-22 Frameworks of the Angola Based Selection Development Water Sector 65CS1/IRSEA/18 / Water Supply Institutional Quality And Cost- Consultancy for beneficiary IBRD / 87020 Strengthening and Capacity Prior Open - International 600,000.00 0.00 Under Review 2019-04-25 2020-06-08 2019-05-16 2020-06-13 2019-06-29 2020-10-06 2019-07-27 2020-12-11 2019-08-26 2021-04-26 2019-09-30 2019-11-04 2020-11-03 Based Selection assessment Development 66CS1/IRSEA/18 / Consultancy for the design Water Supply Institutional Quality And Cost- Under and implementation of an IBRD / 87020 Strengthening and Capacity Post Open - National 150,000.00 0.00 2019-04-17 2018-12-10 2019-05-08 2019-06-21 2019-07-19 2019-08-18 2019-09-22 2019-10-27 2020-04-24 Based Selection Implementation information management Development system 67CS2/INRH/18 / Development of National Quality And Cost- IBRD / 87020 Water Resource Management Post Open - National 150,000.00 0.00 Canceled 2019-05-29 2019-06-19 2019-08-02 2019-08-30 2019-09-29 2019-11-03 2019-12-08 2020-06-05 Water Resources Information Based Selection and Use System Page 6 9CS3/NDALATANDO/DNA/16 / Design checking and works supervision for the Rehabilitation and Expansion Quality And Cost- refurbishment of the / of Water Supply Production Prior Open - International 2,400,000.00 0.00 Canceled 2017-02-16 2017-03-09 2017-04-22 2017-06-20 2017-07-20 2017-08-24 2017-09-28 2020-09-28 Based Selection treatment plant and and Distribution construction of distribution centers in Ndalatando 72CS4/UCP/18 / Support to Management and Engineering Least Cost the recruitment process of IBRD / 87020 Prior Open - National 50,000.00 503,072.65 Signed 2018-09-27 2018-11-19 2018-10-18 2018-12-03 2018-12-01 2019-03-26 2018-12-29 2019-05-06 2019-01-28 2019-06-10 2019-03-04 2019-07-07 2019-04-08 2019-08-02 2019-10-05 Support Selection young professionals 64CS1/IRSEA/18 / Water Supply Institutional Quality And Cost- Consultancy for the baseline IBRD / 87020 Strengthening and Capacity Post Open - National 200,000.00 0.00 Canceled 2019-05-30 2019-06-20 2019-08-03 2019-08-31 2019-09-30 2019-11-04 2019-12-09 2020-06-06 Based Selection for the sector Development 50CS3/LUBANGO/DNA/18 / Design checking and works Rehabilitation and Expansion Quality And Cost- Under Supervision of Network and COFN / C1560 of Water Supply Production Post Open - International 900,000.00 0.00 2020-01-03 2020-09-01 2020-02-02 2020-09-28 2020-03-02 2020-03-30 2020-04-29 2020-06-03 2020-07-08 2021-12-30 Based Selection Implementation Home Connections for and Distribution Lubango (1st phase) 52CS3/KUITO/DNA/18 / Design checking and works Rehabilitation and Expansion Quality And Cost- Supervision of Network and COFN / C1560 of Water Supply Production Post Open - International 800,000.00 0.00 Under Review 2020-02-05 2021-06-22 2020-02-26 2020-04-10 2020-05-08 2020-06-07 2020-07-12 2020-08-16 2021-08-16 Based Selection Home Connections for Kuito and Distribution (2nd phase) 51CS3/MALANJE/DNA/18 / Design Checking and Rehabilitation and Expansion Quality And Cost- Supervision of Repairs to IBRD / 87020 of Water Supply Production Prior Open - International 1,000,000.00 0.00 Canceled 2018-07-27 2018-08-17 2018-09-30 2018-10-28 2018-11-27 2019-01-01 2019-02-05 2020-02-05 Based Selection Household Connections at and Distribution Malanje 69CS2/INRH/18 / Survey of water users and assessment Quality And Cost- COFN / C1560 Water Resource Management Prior Open - International 1,500,000.00 0.00 Canceled 2020-03-20 2020-04-10 2020-05-24 2020-06-21 2020-07-21 2020-08-25 2020-09-29 2021-09-29 of volume of water demand in Based Selection Cuanza river basin 68CS2/INRH/18 / Quality And Cost- Development and Application COFN / C1560 Water Resource Management Prior Open - International 1,500,000.00 0.00 Canceled 2020-04-23 2020-05-14 2020-06-27 2020-07-25 2020-08-24 2020-09-28 2020-11-02 2021-11-02 Based Selection of Water Rights 75CS3/UIGE/19 / Design checking and works Rehabilitation and Expansion Quality And Cost- supervision for the COFN / C1560 of Water Supply Production Prior Open - International 2,400,000.00 0.00 Under Review 2019-06-26 2019-10-08 2019-07-17 2019-10-09 2019-08-30 2021-03-10 2019-10-28 2020-05-19 2019-11-27 2021-04-15 2020-01-01 2020-02-05 2024-01-15 Based Selection construction of a new bulk and Distribution water supply system at Uige 59CS3/LUBANGO/DNA/18 / Hydrogeological survey and Management and Engineering Quality And Cost- prospection of new COFN / C1560 Prior Open - International 4,800,000.00 890,368.15 Signed 2018-05-24 2019-08-05 2018-06-14 2019-08-07 2018-07-28 2019-10-03 2018-08-25 2020-01-06 2018-09-24 2020-02-24 2018-10-29 2020-04-07 2018-12-03 2020-04-30 2019-12-03 Support Based Selection production boreholes in Lubango 76CS3/LUBANGO/18 / Consultancy Services for Rehabilitation and Expansion Consultant Environmental and Social COFN / C1560 of Water Supply Production Post Qualification Open - International 200,000.00 180,599.43 Signed 2019-04-22 2019-04-18 2019-05-13 2019-05-03 2019-06-11 2019-06-24 2019-06-25 2019-08-28 2019-07-30 2019-11-04 2020-01-26 Impact Assessment for Water and Distribution Selection Supply Reservoirs at Lubango 79CS1/UCP/19 / Water Supply Institutional Quality And Cost- Independent Verification COFN / C1560 Strengthening and Capacity Prior Open - International 2,000,000.00 2,509,764.71 Signed 2019-08-25 2019-10-17 2019-09-15 2019-10-21 2019-10-29 2020-04-23 2019-11-26 2020-06-16 2019-12-26 2020-07-23 2020-01-30 2020-11-19 2020-03-05 2021-01-25 2025-02-07 Based Selection Agent for the Management Development Contracts 84CS4/EPAL/19 / Management and Engineering Quality And Cost- Under Independent Technical Audit COFN / C1560 Prior Open - International 1,800,000.00 1,687,552.94 2019-08-11 2019-08-16 2019-09-01 2020-04-13 2019-10-15 2020-08-26 2019-11-12 2020-10-26 2019-12-12 2021-02-21 2020-01-16 2021-03-30 2020-02-20 2023-02-19 Support Based Selection Implementation of BITA Project 85CS4/EPAL/19 / Management and Engineering Quality And Cost- Under Independent Safeguards COFN / C1560 Post Open - International 700,000.00 647,757.59 2019-08-11 2019-08-08 2019-09-01 2020-04-10 2019-10-15 2020-07-23 2019-11-12 2020-09-15 2019-12-12 2021-02-03 2020-01-16 2021-03-31 2020-02-20 2023-02-19 Support Based Selection Implementation Auditor of BITA Project 73CS2/INRH/19 / Economic Quality And Cost- and Financial Regime of the COFN / C1560 Water Resource Management Post Open - International 500,000.00 0.00 Canceled 2019-11-29 2019-12-20 2020-02-02 2020-03-01 2020-03-31 2020-05-05 2020-06-09 2020-12-09 Based Selection Use of Water Resources 89CS1/UCP/19 / Technical Water Supply Institutional Quality And Cost- Under Assistance to National Water COFN / C1560 Strengthening and Capacity Prior Open - International 4,000,000.00 0.00 2020-06-30 2020-07-21 2020-09-03 2020-10-01 2020-10-31 2020-12-05 2021-01-09 2021-01-19 Based Selection Implementation Directorate (DNA) Development 90CS1/IRSEA/19 / Analysis of alternatives to subsidise Water Supply Institutional Quality And Cost- Under low income population and COFN / C1560 Strengthening and Capacity Post Open - International 300,000.00 0.00 2020-02-20 2019-11-26 2020-03-12 2020-01-21 2020-04-25 2020-04-22 2020-05-23 2020-06-18 2020-06-22 2020-08-17 2020-07-27 2020-08-31 2021-02-27 Based Selection Implementation identification of potential Development beneficiaries 86CS5/UCP/19 / Sanitation Piloting Small-Scale Master Plans for Cuito, Quality And Cost- Under COFN / C1560 Sanitation Service Delivery in Prior Open - International 1,600,000.00 0.00 2019-10-30 2020-03-25 2019-11-20 2020-04-16 2020-01-03 2020-07-23 2020-01-31 2020-09-30 2020-03-01 2020-11-27 2020-04-05 2021-04-16 2020-05-10 2021-11-01 Dundo, Huambo, Luena Based Selection Implementation Peri-Urban Areas Moçamedes and N´dalatando 80CS1/UCP/19 / PPP Water Supply Institutional Quality And Cost- Under Transaction Advisor for COFN / C1560 Strengthening and Capacity Prior Open - International 1,400,000.00 0.00 2019-12-02 2020-07-15 2019-12-23 2020-07-22 2020-02-20 2020-10-12 2020-03-19 2021-01-18 2020-04-18 2021-04-22 2020-05-23 2021-06-18 2020-06-27 2021-06-27 Based Selection Implementation Cabinda Development 97CS2/INRH/20 / Development of Water Quality And Cost- Under Resources Management Tools COFN / C1560 Water Resource Management Prior Open - International 3,000,000.00 0.00 2020-03-02 2020-04-21 2020-03-23 2020-04-22 2020-05-06 2020-11-17 2020-06-03 2021-02-26 2020-07-03 2020-08-07 2020-09-11 2021-09-11 Based Selection Implementation and Information Management System 98CS2/INRH/20 / Consultant Quality And Cost- Under for Elaboration of the National COFN / C1560 Water Resource Management Prior Open - International 2,500,000.00 0.00 2020-03-02 2020-04-27 2020-03-23 2020-04-29 2020-05-06 2020-11-17 2020-06-03 2021-03-03 2020-07-03 2020-08-07 2020-09-11 2021-09-11 Based Selection Implementation Water Resources Cadaster 99CS2/INRH/20 / Consultant for Implementation of the Quality And Cost- Pending Economic and Financial COFN / C1560 Water Resource Management Prior Open - National 2,000,000.00 0.00 2020-03-02 2020-03-23 2020-05-06 2020-06-03 2020-07-03 2020-08-07 2020-09-11 2021-09-11 Based Selection Implementation Framework for the General Use of Water Resources Page 7 100CS3/NDLATANDO/DNA/2 0 / Design Checking and Works Supervision of the Rehabilitation and Expansion Quality And Cost- Under Expansion and Rehabilitation COFN / C1560 of Water Supply Production Prior Open - International 1,330,000.00 0.00 2020-05-10 2020-04-29 2020-05-31 2020-05-04 2020-07-14 2020-07-29 2020-08-11 2020-10-29 2020-09-10 2021-01-07 2020-10-15 2021-05-28 2020-11-19 2021-11-19 Based Selection Implementation of the Existing Mucari Bulk and Distribution Water Supply System of the city of Ndalatando 101CS3/NDLATANDO/DNA/2 0 / Design Checking and Rehabilitation and Expansion Quality And Cost- Works Supervision of the COFN / C1560 of Water Supply Production Prior Open - International 2,000,000.00 0.00 Under Review 2020-05-11 2020-05-06 2020-06-01 2020-05-07 2020-07-15 2020-07-29 2020-08-12 2020-10-14 2020-09-11 2021-01-05 2020-10-16 2020-11-20 2021-11-20 Based Selection Network and home and Distribution connections in Ndalatando 102CS3/UIGE/DNA/20 / Design Checking and Works Rehabilitation and Expansion Quality And Cost- Under Supervision of the Network COFN / C1560 of Water Supply Production Prior Open - International 2,000,000.00 0.00 2020-05-18 2020-05-07 2020-06-08 2020-05-14 2020-07-22 2021-04-02 2020-08-19 2020-10-16 2020-09-18 2021-04-22 2020-10-23 2021-05-18 2020-11-27 2021-11-27 Based Selection Implementation and home connections in Uige and Distribution - Lot 2 104CS3/INRH/20 / Development of Detailed Quality And Cost- Under Inventory of Reservoirs and COFN / C1560 Water Resource Management Prior Open - International 2,500,000.00 0.00 2020-08-10 2020-08-03 2020-08-31 2020-08-07 2020-10-14 2021-04-19 2020-11-11 2020-12-11 2021-01-15 2021-02-19 2022-02-19 Based Selection Implementation Detailed Dam Safety Assessment of Selected Dams 14ACS4/NAMIBE/19 / Groundwater Potential and Salinity Management in Management and Engineering Quality And Cost- COFN / C1560 Prior Open - International 2,000,000.00 0.00 Under Review 2020-09-28 2020-10-22 2020-11-28 2021-03-16 2021-01-11 2021-03-11 2021-04-10 2021-05-15 2022-01-17 2023-07-19 Moçamedes Well Fields and Support Based Selection associated Namibe Coastal Cities 39ACS1/DNA/20 / External Audit of the Financial Management and Engineering Least Cost Under Statements of Seven (7) IBRD / 87020 Post Open - International 240,000.00 0.00 2020-10-30 2020-11-17 2020-11-20 2020-11-18 2021-01-03 2021-01-31 2021-03-02 2021-04-06 2021-05-11 2024-05-10 Support Selection Implementation Beneficiary Water Supply and Sanitation Utilities 16ACS1/DNA/20 / External Management and Engineering Least Cost Under Audit of the Financial IBRD / 87020 Post Open - International 100,000.00 0.00 2020-10-30 2020-11-18 2020-11-20 2020-11-26 2021-01-03 2021-01-31 2021-03-02 2021-04-06 2021-05-11 2024-05-10 Support Selection Implementation Statements of the Project 96CS3/UIGE/20 / Consultancy Services for Rehabilitation and Expansion Consultant Environmental and Social COFN / C1560 of Water Supply Production Post Qualification Open - International 200,000.00 0.00 Canceled 2020-02-28 2020-03-20 2020-04-18 2020-05-02 2020-06-06 2020-12-03 Impact Assessment for and Distribution Selection Ndalatando Bulk Water Supply 106CS3/DNA/20 / Rehabilitation and Expansion Consultant Infrastructure Surveys Water COFN / C1560 of Water Supply Production Post Qualification Open - National 295,000.00 0.00 Canceled 2020-09-06 2020-09-27 2020-11-10 2020-12-10 2021-01-14 2021-07-13 Supply Systems in 6 Provinces and Distribution Selection 87CS4/UCP/21 / Management and Engineering Least Cost IBRD / 87020 Post Open - International 100,000.00 0.00 Canceled 2021-05-31 2021-04-27 2021-06-21 2021-08-04 2021-09-01 2021-10-01 2021-11-05 2021-12-10 2022-06-08 Procurement Auditor Support Selection 107CS4/UCP/21 / Management and Engineering Least Cost IBRD / 87020 Prior Open - International 100,000.00 0.00 Under Review 2021-08-22 2021-06-11 2021-09-12 2021-10-26 2021-11-23 2021-12-23 2022-01-27 2022-03-03 2022-08-30 Procurement Auditor Support Selection 108CS3/NDALATANDO/21 / Consultancy services for the Environmental and Social Water Supply Institutional Quality And Cost- Under Impact Assessment (ESIA) of IBRD / 87020 Strengthening and Capacity Post Open - International 800,000.00 0.00 2021-06-28 2021-06-02 2021-07-19 2021-06-08 2021-09-01 2021-09-29 2021-10-29 2021-12-03 2022-01-07 2023-01-07 Based Selection Implementation the existing Mucari water Development supply system in the city of Ndalatando 109CS3/N DALATANDO/21 / Consultant services for Design checking and Work Supervision of distribution Rehabilitation and Expansion Quality And Cost- Pending network and household IBRD / 87020 of Water Supply Production Post Open - International 800,000.00 0.00 2021-08-22 2021-09-12 2021-10-26 2021-11-23 2021-12-23 2022-01-27 2022-03-03 2023-03-03 Based Selection Implementation connections in city of Lucala and Distribution and rural communities between Lucala and N’Dalatando INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual 11CS4/DNA/16 / Management and Engineering / Prior Consultant Direct 400,000.00 0.00 Canceled 2017-02-23 2018-02-28 2017-03-05 2018-03-01 2017-03-26 2017-04-30 2018-04-30 Hydrogeology specialist Support Selection Water Supply Institutional Individual 17CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 802,786.25 Under Review 2017-04-17 2017-05-09 2017-06-03 2017-06-28 2017-06-17 2017-07-25 2017-06-27 2017-07-26 2017-12-24 FCMU Coordinator Development Selection 18CS4/DNA/17 / Senior Water Supply Institutional Individual Financial Management IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 809,328.48 Signed 2017-04-24 2017-05-10 2017-06-10 2017-06-28 2017-06-24 2017-07-26 2017-07-04 2017-06-28 2020-07-03 Specialist Development Selection Water Supply Institutional Individual 19CS4/DNA/17 / Financial IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 515,059.06 Signed 2017-04-24 2017-05-09 2017-06-10 2017-06-24 2017-09-26 2017-07-04 2017-09-27 2020-07-03 Management Specialist-DNA Development Selection Water Supply Institutional Individual 20CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 803,171.16 Signed 2017-04-28 2017-05-09 2017-06-14 2017-07-10 2017-06-28 2017-08-10 2017-07-08 2017-08-10 2020-07-07 Procurement Specialist Development Selection Water Supply Institutional Individual 21CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 500,000.00 645,406.98 Terminated 2017-04-28 2017-05-09 2017-06-14 2017-09-20 2017-06-28 2017-10-30 2017-07-08 2017-11-03 2019-07-08 Procurement Specialist Development Selection Water Supply Institutional Individual 22CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 405,940.19 Signed 2017-04-28 2017-05-09 2017-06-14 2017-07-12 2017-06-28 2017-08-10 2017-07-08 2017-08-10 2020-07-07 Procurement Specialist-DNA Development Selection Page 8 Water Supply Institutional Individual 23CS4/DNA/17 / Water IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 683,580.67 Under Review 2017-07-21 2017-08-09 2017-09-15 2017-09-27 2017-10-06 2017-10-18 2017-11-10 2017-10-20 2019-05-04 Utility Management Specialist Development Selection Individual 26CS4/DNA/17 / Management and Engineering IBRD / 87020 Prior Consultant Open 250,000.00 211,571.46 Under Review 2017-09-15 2017-09-12 2017-11-03 2017-11-24 2018-01-23 2017-12-29 2018-01-26 2020-12-28 Procurement officer (1) Support Selection Individual 27CS4/DNA/17 / Management and Engineering IBRD / 87020 Prior Consultant Open 250,000.00 211,571.46 Signed 2017-09-15 2017-09-12 2017-11-03 2017-11-24 2018-01-25 2017-12-29 2018-01-26 2020-12-28 Procurement Officer (2) Support Selection 28CS4/DNA/17 / Individual Management and Engineering Design/Environmental Expert IBRD / 87020 Prior Consultant Open 385,000.00 592,846.42 Signed 2017-11-01 2017-09-25 2017-12-20 2018-03-07 2018-01-10 2018-05-04 2018-02-14 2018-05-07 2019-08-08 Support to Support DNA/FCMU Selection Individual 24CS4/DNA/17 / Senior Management and Engineering IBRD / 87020 Prior Consultant Open 500,000.00 589,780.01 Signed 2017-09-15 2017-09-11 2017-11-03 2017-11-24 2017-11-07 2017-12-29 2017-11-08 2019-12-29 Design Engineer Support Selection Individual 25CS4/DNA/17 / Senior Management and Engineering IBRD / 87020 Prior Consultant Open 500,000.00 862,744.00 Signed 2017-12-08 2018-05-08 2018-01-26 2018-07-20 2018-02-16 2018-08-06 2018-03-23 2018-08-07 2020-03-22 Environmental Specialist Support Selection 29CS4/DNA/17 / Technical Individual Management and Engineering Assistance to support IBRD / 87020 Prior Consultant Open 350,000.00 574,577.39 Signed 2017-09-28 2017-09-12 2017-11-16 2017-10-23 2017-12-07 2018-02-20 2018-01-11 2018-02-21 2019-07-05 Support DNA/FCMU Selection Individual 30CS4/DNA/17 / Project Management and Engineering IBRD / 87020 Prior Consultant Open 320,000.00 303,884.13 Signed 2017-10-20 2017-10-16 2017-12-08 2017-12-29 2018-08-06 2018-02-02 2018-08-07 2019-07-27 Accountant Support Selection Individual 31CS4/DNA/17 / Financial Management and Engineering IBRD / 87020 Post Consultant Open 170,000.00 139,944.69 Signed 2017-10-20 2017-10-25 2017-12-08 2018-03-07 2017-12-29 2018-03-07 2018-02-02 2018-03-01 2019-07-27 Assistant (1) Support Selection Individual 32CS4/DNA/17 / Financial Management and Engineering IBRD / 87020 Post Consultant Open 170,000.00 139,944.69 Signed 2017-10-20 2017-10-25 2017-12-08 2017-12-29 2018-03-13 2018-02-02 2018-03-01 2019-07-27 Assistant (2) Support Selection 34CS4/DNA/17 / Consultant Individual to Support the Management and Engineering IBRD / 87020 Post Consultant Direct 45,000.00 42,000.00 Signed 2017-11-30 2017-10-12 2017-12-10 2018-04-11 2017-12-31 2018-08-09 2018-02-04 2018-08-10 2018-08-03 Implementation of the Support Selection Primavera Accounting System Rehabilitation and Expansion Individual 36CS4/DNA/17 / Monitoring IBRD / 87020 of Water Supply Production Prior Consultant Open 250,000.00 236,000.00 Signed 2018-05-24 2018-09-04 2018-07-12 2019-02-05 2018-08-02 2019-08-22 2018-09-06 2019-08-28 2019-03-05 Evaluation Specialist and Distribution Selection Rehabilitation and Expansion Individual 37CS4/DNA/17 / Supervision IBRD / 87020 of Water Supply Production Prior Consultant Open 700,000.00 647,470.59 Signed 2018-06-03 2018-05-25 2018-07-22 2018-07-11 2018-08-12 2018-08-13 2018-09-16 2018-08-14 2021-08-31 Engineer and Distribution Selection Rehabilitation and Expansion Individual 40CS4/DNA/17 / Stakeholder IBRD / 87020 of Water Supply Production Prior Consultant Open 700,000.00 750,681.66 Signed 2018-04-20 2018-05-16 2018-06-08 2018-08-30 2018-06-29 2018-09-11 2018-08-03 2018-09-13 2020-07-23 Engagement e Social Specialist and Distribution Selection Individual 41CS4/DNA/17 / Information Management and Engineering IBRD / 87020 Prior Consultant Open 200,000.00 170,677.58 Under Review 2018-01-08 2018-01-23 2018-02-26 2018-05-07 2018-03-19 2018-06-26 2018-04-23 2018-06-26 2021-04-07 Technology Support Selection 43CS1/IRSEA/18 / SHORT Water Supply Institutional Individual TERM TECHNICAL ASSISTANCE IBRD / 87020 Strengthening and Capacity Post Consultant Open 80,000.00 121,613.80 Signed 2018-03-19 2018-03-15 2018-04-28 2018-05-03 2018-05-08 2018-05-03 2018-05-18 2018-06-18 2018-11-14 TO IRSEA Development Selection Individual 11ACS4/DNA/18 / Management and Engineering IBRD / 87020 Post Consultant Direct 180,000.00 276,428.51 Signed 2018-04-16 2018-06-27 2018-04-26 2018-07-17 2018-05-17 2018-09-10 2018-06-21 2018-09-10 2019-12-13 Hydrogeology specialist Support Selection 61CS4/DNA/18 / Consultant Individual to prepare the TORs for the Management and Engineering IBRD / 87020 Post Consultant Open 80,000.00 0.00 Canceled 2018-07-02 2018-08-20 2018-09-10 2018-10-15 2019-01-13 Updates of the Master Plans in Support Selection 9 Cities 102CS2/DAS/18 / Short Individual Term Technical Assistance to IBRD / 87020 Water Resource Management Post Consultant Direct 100,000.00 104,762.41 Signed 2018-06-11 2018-06-29 2018-06-21 2018-06-13 2018-07-12 2018-07-16 2018-08-16 2018-07-16 2019-02-12 INRH Selection 52CS3/DAS/18 / DESIGN CHECKING AND WORK Rehabilitation and Expansion SUPERVISION OF NETWORK IBRD / 87020 of Water Supply Production Prior Direct Selection Direct 850,000.00 867,067.03 Signed 2018-06-11 2018-06-14 2018-06-13 2018-06-19 2018-07-01 2018-06-29 2018-12-28 AND HOUSE CONNECTIONS IN and Distribution THE CITY OF HUAMBO - LOT 2 Water Supply Institutional Individual 21ACS4/DNA/18 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Limited 450,000.00 683,681.52 Signed 2018-06-13 2018-06-27 2018-06-18 2018-07-09 2018-07-09 2018-08-20 2018-08-13 2018-08-21 2020-08-02 Procurement Specialist Development Selection 18ACS4/DNA/18 / SENIOR Water Supply Institutional Individual FINANCIAL MANAGEMENT IBRD / 87020 Strengthening and Capacity Prior Consultant Limited 700,000.00 701,993.30 Signed 2018-07-20 2018-07-19 2018-08-04 2018-08-20 2018-08-09 2018-09-26 2018-08-29 2018-09-27 2021-08-13 SPECIALIST Development Selection Individual 63CS4/UCP/18 / Senior Management and Engineering IBRD / 87020 Prior Consultant Open 450,000.00 0.00 Canceled 2018-08-22 2018-08-14 2018-10-10 2019-03-18 2018-10-31 2018-12-05 2020-12-04 Sanitation Specialist Support Selection Individual 77CS4/UCP/19 / Second Management and Engineering COFN / C1560 Prior Consultant Open 400,000.00 389,156.32 Signed 2019-06-28 2019-06-06 2019-08-16 2019-07-17 2019-09-06 2019-08-05 2019-10-11 2019-08-12 2021-10-10 Senior Works Supervisor Support Selection Individual 82CS4/UCP/19 / Second Management and Engineering COFN / C1560 Prior Consultant Open 400,000.00 446,779.84 Signed 2019-09-16 2019-08-07 2019-11-04 2020-01-16 2019-11-25 2020-02-07 2019-12-30 2020-02-14 2021-12-29 Senior Design Engineer Support Selection Rehabilitation and Expansion Individual 83CS3/UCP/19 / Dispute Under COFN / C1560 of Water Supply Production Prior Consultant Limited 50,000.00 0.00 2019-09-15 2019-09-20 2019-10-11 2019-11-15 2022-11-14 Board Member Implementation and Distribution Selection Page 9 81CS4/UCP/19 / Project Individual Management and Engineering Financial and Administrative COFN / C1560 Prior Consultant Open 400,000.00 260,000.00 Signed 2019-08-30 2019-08-05 2019-10-18 2020-12-15 2019-11-08 2021-01-14 2019-12-13 2021-01-28 2021-12-12 Support Officer Selection Rehabilitation and Expansion Individual 83ACS3/UCP/19 / Dispute COFN / C1560 of Water Supply Production Post Consultant Limited 50,000.00 0.00 Canceled 2019-10-30 2019-10-04 2019-11-04 2019-11-25 2019-12-30 2022-12-29 Board Member and Distribution Selection Individual 20ACS4/UCP/19 / Senior Management and Engineering COFN / C1560 Prior Consultant Open 500,000.00 444,203.36 Signed 2019-10-04 2019-10-07 2019-11-20 2020-01-30 2019-12-04 2020-02-24 2019-12-14 2020-02-26 2021-12-13 Procurement Specialist Support Selection Individual 63ACS4/UCP/19 / Sanitation Management and Engineering COFN / C1560 Prior Consultant Open 400,000.00 359,356.32 Signed 2019-10-04 2019-10-07 2019-11-22 2020-01-24 2019-12-13 2020-02-24 2020-01-17 2020-02-14 2022-01-16 Specialist Support Selection Individual 88CS4/UCP/19 / Financial Management and Engineering COFN / C1560 Post Consultant Open 70,000.00 67,200.00 Signed 2019-11-19 2019-10-11 2020-01-07 2020-02-27 2020-01-28 2020-04-22 2020-03-03 2020-04-22 2021-08-25 Assistant (3) Support Selection Water Supply Institutional Individual 22ACS4/DNA/17 / Under IBRD / 87020 Strengthening and Capacity Prior Consultant Open 205,000.00 0.00 2020-01-26 2020-02-11 2020-03-13 2020-04-14 2020-03-27 2020-05-04 2020-04-06 2021-01-31 Procurement Specialist DNA Implementation Development Selection Individual 27ACS4/DNA/20 / Management and Engineering COFN / C1560 Prior Consultant Open 250,000.00 224,400.00 Signed 2020-08-17 2020-08-27 2020-10-05 2021-02-16 2020-10-26 2021-03-02 2020-11-30 2021-03-15 2021-05-29 Procurement Officer Support Selection Individual 33CS4/DNA/17 / MIS Management and Engineering IBRD / 87020 Post Consultant Open 60,000.00 0.00 Canceled 2017-11-30 2018-01-18 2018-02-08 2018-03-15 2018-06-13 Consultant Support Selection Rehabilitation and Expansion Individual 38CS4/DNA/17 / Senior IBRD / 87020 of Water Supply Production Prior Consultant Open 500,000.00 0.00 Canceled 2018-03-13 2018-05-01 2018-05-22 2018-06-26 2021-06-10 Environmental Specialist and Distribution Selection 58CS1/UCP/20 / Consultant to support Cuanza North Individual Management and Engineering Province Water and Sanitation IBRD / 87020 Post Consultant Limited 72,000.00 0.00 Canceled 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2021-07-29 Support Utility to implement Non- Selection Revenue Water Strategy 78CS1/UCP/20 / Consultant to support Huila Province Individual Management and Engineering Water and Sanitation Utility to IBRD / 87020 Post Consultant Limited 72,000.00 0.00 Canceled 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2021-07-29 Support implement Non-Revenue Selection Water Strategy Page 10 PROCUREMENT PLAN General 1. Project Information a. Country: Federal Republic of Somalia b. Project Name: Water For Agro-Pastoral and Reselience Productivity c. Project Number: P167826 d. Total Finance: USD 5 Million 2. Project Implementation Agency: South West State of Somalia 3. Date of Project Plan: October 2018 4. Period Covered by this Procurement: January 2019 – June 2020 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Document: The Bank’s standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified into Procurement Plan tables in STEP III. National Procurement Arrangements: Not applicable IV. Prequalification: Not applicable V. Leased Assets: Not Applicable 1 VI. Procurement of Second hand Goods: Not Applicable VII. Domestic Preference: Not Applicable VIII. Hands on Expanded Implementation Support (HEIS): Not Applicable IX. Other Relevant Procurement Information: Not Applicable X. Thresholds for Procurement Approaches and Method (US$ millions) Thresholds for Procurement Approaches and Methods (US$ millions)– Goods, Works, and Non-Consulting Services Category Prior Open Open Request for Review Internation Nation Quotation (US$ al al (RfQ) millions) Works all ≥ 5.0 < 5.0 ≤ 0.2 Goods, IT, and all ≥ 0.5 < 0.5 ≤ 0.1 non-consulting services Thresholds for Procurement Approaches and Methods (US$, millions) – Consulting Services Category Prior Short List of National Consultants Review Consulting Engineering and (US$, Services Construction millions) Supervision Consultants n.a n.a. all (Firms) Individual all n.a. n.a. Consultants 2 South West Procurement Plan XI. Packages for Goods, Works and Non-Consulting Services (At Negotiations – to be entered in STEP) R Contract Estimate Revie Market Sel Eval Procure Preq Do Expected Expected ef Description d Cost w by Approac ecti uati ment ualif mes date of date of . (US$) Bank h (Open- on on Process icati tic bid/ Contract N (Prior National Me Opti (Single on Pref proposal Signatur o / / Limited tho ons stage- (Yes/ ere opening e Post) etc.) d (BA single No) nce (RF FO envelop (Yes P, Rat e etc.) /No) RF ed B, Crit RF eria Q etc. etc ) .) GOODS Low est Single G Purchase of 5 Open Eval stage 02/Mar/20 02/Apr/20 $175,000 Prior RFB N/A N/A 1 vehicles National uate One- 19 19 d Envelop Cost Low Office Equipment est Singe (Laptops, G Eval stage 04/Mar/20 04/Apr/20 Desktops, $30,000 Prior Limited RFQ N/A N/A 2 Projector, Printers uate One - 19 19 and accessories) d Envelop Cost 3 Low est Single G Eval Stage 05/May/20 05/Jun/201 GIS Equipment $25,000 Prior Limited RFQ N/A N/A 3 uate One- 19 9 d Envelop Cost Low est Single Hydrological G Eval Stage 15/Oct/20 16/Nov/20 Water Monitoring $12,000 Prior Limited RFQ N/A N/A 4 Tools uate One- 19 19 d Envelop Cost Low est Single G Open Eval Stage 21/Mar/20 22/Apr/20 Vehicle Fuels $80,000 Prior RFQ N/A N/A 6 National uate One- 19 19 d Envelop Cost Low est Single G Office furniture Eval Stage 12/Jun/202 13/Jul/202 $30,000 Prior Limited RFQ N/A N/A 7 (Chairs, Tables, ) uate One- 0 0 d Envelop Cost Total Goods $352,000 WORKS Construction of Low Sand Dams/Sub- est Single W surface Dams Open Eval stage – 09/Nov/20 10/Dec/20 $90,000 Prior RFQ N/A N/A 1 National uate one 19 19 d envelope Cost 4 Construction of Low Earth Dams est Single W Open Eval stage – 01/Oct/20 02/Nov/20 $90,000 Prior RFQ N/A N/A 2 National uate one 19 19 d envelope Cost Construction/Reh Low abilitation of 10 est Single W Berkads Open Eval stage – 01/Sep/20 01/Oct/20 $42,000 Prior RFQ N/A N/A 3 National uate one 19 19 d envelope Cost Rehabilitation of Low Boreholes/Shallow est Single W Wells Open Eval stage – 18/Aug/20 19/Sep/20 $50,000 Prior RFQ N/A N/A 4 National uate one 19 19 d envelope Cost Office Low Construction/Reh est Single W abilitation Open Eval stage – 01/Aug/20 01/Sep/20 $70,000 Prior RFQ N/A N/A 5 National uate one 19 19 d envelope Cost Total Works $342,000 Non -Consulting Services Total Non- Consultant Service Consulting Services 5 Re Contract Estimate Review Market Selecti Shortli Expected Expected f Description d Cost by Bank Approach on sting Date of Date of No (US$) (Prior/Po (Open- Metho (Yes/N Bid Contract . st) National/ d o) Proposal Signatur Limited (QCBS Opening e etc.) , LCBCS , QBS, DS Site selection, geophysical surveying, Open – 16/Mar/201 15/Apr/20 C1 100,000 Prior CQS N/A contracting and National 9 19 engineering support Develop GIS map Prior Open - CQS 08/Aug/20 C2 for potential sites 20,000 N/A 08/Jul/2019 National 19 creation of village livelihood development Open - 13/May/202 10/Jun/202 C3 plans & water 500,000 Prior QCBS N/A International 0 0 budgets implement rural development policies and laws Open 12/Feb/20 C4 to regulate sector 50,000 Prior CQS N/A 15/Jan/2020 and ensure National 20 sustainability technical assistance agency Open 22/Feb/202 19/Mar/20 C5 for training 60,000 Prior CQS N/A assessment, National 0 20 selecting, training 6 and monitoring field service support, acquisition and application of geo-spatial Open – 01/Mar/202 01/Apr/20 C6 imagery for 20,000 Prior CQS N/A before and after National 0 20 satelite photos Procurement 05/Feb/20 C7 50,000 Prior Open INDV N/A 05/Jan/2019 Specialist 19 Open INDV 05/Feb/20 C8 Finance Specialist 50,000 Prior N/A 05/Jan/2019 19 Open INDV 10/Feb/201 10/Mar/20 C9 Project Engineer 72,000 Prior N/A 9 19 C1 Open INDV 31/Oct/20 2 Site Engineers 21,000 Prior N/A 01/Oct/2019 0 19 Total $943,000 Consulting Services $1,637,0 Grand Total 00 7 PROCUREMENT Somalia : Somalia - Water for Agro-pastoral Productivity and Resilience PLAN General Information Country: Somalia Bank’s Approval Date of the Original Procurement Plan: 2019-11-13 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167826 GPN Date: Project Name: Somalia - Water for Agro-pastoral Productivity and Resilience Loan / Credit No: IDA / D4970 Ministry of Planning, Investment and Economic Development, Federal Government of Somalia Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPIED-FGS-162973-NC- Component 4: Project RFQ / Office Equipment for Management, M & E, Request for Single Stage - One IDA / D4970 Prior Limited 58,000.00 61,621.80 Completed 2020-03-19 2020-04-02 2020-04-21 2020-04-22 2020-07-20 2021-03-01 Biyoole PIU Staff and FGS Knowledge Management and Quotations Envelope Implementing agencies Learning SO-MOPIED-FGS-162974-NC- Component 4: Project RFQ / Office furniture for PIU Management, M & E, Request for Single Stage - One IDA / D4970 Prior Limited 62,000.00 45,589.00 Completed 2020-03-18 2020-03-27 2020-04-16 2020-04-27 2020-04-25 2021-01-08 staff and other Biyoole FGS Knowledge Management and Quotations Envelope implementing agencies Learning SO-MOPIED-FGS-163760-GO- Component 4: Project RFB / Vehicles for PIU and Management, M & E, Single Stage - One IDA / D4970 Prior Request for Bids Open - National 230,000.00 189,995.00 Terminated 2020-03-29 2020-03-27 2020-04-03 2020-04-05 2020-05-03 2020-05-13 2020-05-05 2020-06-09 2020-05-26 2020-06-18 2020-09-23 other Biyoole Implementing Knowledge Management and Envelope Agencies Learning Component 4: Project SO-MOPIED-FGS-163979-GO- Management, M & E, Request for Single Stage - One RFQ / Motorbikes for PIU and IDA / D4970 Prior Limited 10,000.00 7,828.00 Completed 2020-03-26 2020-03-27 2020-05-06 2020-05-25 2020-08-04 2021-02-20 Knowledge Management and Quotations Envelope Ministry of Planning Learning SO-MOPIED-FGS-181077-GO- Component 2. Institutional Request for Single Stage - One RFQ / Furniture for MoPIED IDA / D4970 Prior Limited 40,000.00 53,683.60 Completed 2020-06-30 2020-07-08 2020-08-25 2020-08-10 2021-02-21 2020-09-03 and Capacity Development Quotations Envelope Conference and Offices SO-MOPIED-FGS-181078-GO- Component 2. Institutional Request for Single Stage - One RFQ / Equipment for MoPIED IDA / D4970 Prior Limited 40,000.00 54,126.50 Completed 2020-06-30 2020-07-08 2020-08-25 2020-08-10 2021-02-21 2020-12-01 and Capacity Development Quotations Envelope conference hall and offices SO-MOPIED-FGS-197553-GO- Component 4: Project RFB / Vehicles for PCU and Management, M & E, Single Stage - One IDA / D4970 Prior Request for Bids Open - National 200,000.00 0.00 Canceled 2020-10-03 2020-10-09 2020-10-08 2020-11-19 2020-12-19 2021-01-23 2021-07-22 Other Biyoole Implementing Knowledge Management and Envelope Agencies Learning SO-MOPIED-FGS-197553-1- Component 4: Project GO-RFB / Vehicles for PCU Management, M & E, Single Stage - One IDA / D4970 Prior Request for Bids Open - National 200,000.00 0.00 Canceled 2020-03-25 2020-10-21 2020-03-30 2020-05-11 2020-06-10 2020-07-15 2021-01-11 and Other Biyoole Knowledge Management and Envelope Implementing Agencies Learning Component 4: Project SO-MOPIED-FGS-202140-GO- Management, M & E, Single Stage - One RFB / Vehicles for Biyoole PCU IDA / D4970 Prior Request for Bids Open - National 200,000.00 199,375.00 Signed 2020-11-05 2020-11-04 2020-11-10 2020-11-06 2020-12-22 2020-12-03 2021-01-21 2020-12-21 2021-02-25 2020-12-27 2021-08-24 Knowledge Management and Envelope and MDAs Learning NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Project SO-MOPIED-FGS-162960-NC- Management, M & E, Request for Single Stage - One IDA / D4970 Prior Limited 12,000.00 6,180.00 Terminated 2020-03-12 2020-03-25 2020-04-09 2020-04-12 2020-05-15 RFQ / National PIU Office Rent Knowledge Management and Quotations Envelope Learning Component 4: Project SO-MOPIED-FGS-162969-NC- Management, M & E, Request for Single Stage - One RFQ / Office Internet for PIU IDA / D4970 Prior Limited 6,000.00 3,708.00 Terminated 2020-03-15 2020-03-27 2020-04-12 2020-04-12 2021-04-12 Knowledge Management and Quotations Envelope office Learning SO-MOPIED-FGS-221800-NC- RFQ / Consultancy to Component 2. Institutional Request for Single Stage - One IDA / D4970 Post Limited 20,000.00 0.00 Canceled 2021-03-04 2021-04-29 2021-07-28 Develop
a Website and Social and Capacity Development Quotations Envelope Media Platform for The MoEWR CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPIED-FGS-228768-CS- Consultant CQS / Consultancy to Develop Component 2. Institutional Under IDA / D4970 Prior Qualification Limited 20,000.00 0.00 2021-04-17 2021-05-04 2021-05-01 2021-05-31 2021-07-05 2022-01-01 Website and Social Media for and Capacity Development Implementation Selection the Ministry of Water Component 4: Project SO-MOPIED-FGS-238154-CS- Consultant Management, M & E, CQS / Installation of Four IDA / D4970 Prior Qualification Limited 80,000.00 0.00 Under Review 2021-06-19 2021-07-03 2021-08-02 2021-09-06 2022-03-05 Knowledge Management and Water Stations Selection Learning Page 1 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Project Individual SO-MOPIED-FGS-145253-CS- Management, M & E, IDA / D4970 Prior Consultant Limited 80,000.00 192,000.00 Signed 2019-11-14 2020-02-01 2019-11-19 2020-01-07 2019-11-29 2020-02-05 2019-12-05 2020-02-03 2020-11-30 INDV / Project Coordinator Knowledge Management and Selection Learning Component 4: Project Individual SO-MOPIED-FGS-145255-CS- Management, M & E, IDA / D4970 Prior Consultant Limited 60,000.00 140,280.00 Signed 2019-11-25 2019-12-18 2019-11-30 2019-12-04 2019-12-05 2020-01-03 2019-12-12 2020-01-04 2020-11-30 INDV / Procurement Specialist Knowledge Management and Selection Learning Component 4: Project SO-MOPIED-FGS-162971-CS- Individual Management, M & E, INDV / Financial Management IDA / D4970 Prior Consultant Limited 139,500.00 123,000.00 Signed 2020-03-12 2020-03-18 2020-03-17 2020-03-21 2020-03-27 2020-04-01 2020-04-10 2020-03-30 2021-04-10 Knowledge Management and Specialist Selection Learning Component 4: Project SO-MOPIED-FGS-148847-CS- Individual Management, M & E, INDV / Monitoring and IDA / D4970 Prior Consultant Limited 60,000.00 0.00 Canceled 2019-12-10 2019-12-15 2019-12-20 2020-01-24 2020-12-08 Knowledge Management and Evaluation Specialist Selection Learning Component 4: Project SO-MOPIED-FGS-164161-CS- Individual Management, M & E, INDV / MoF Biyoole Finance IDA / D4970 Prior Consultant Limited 113,100.00 12,750.00 Terminated 2020-03-16 2020-04-14 2020-03-21 2020-04-14 2020-03-28 2020-04-23 2020-04-11 2020-04-25 2021-04-11 Knowledge Management and Officer Selection Learning Component 4: Project SO-MOPIED-FGS-167357-CS- Individual Management, M & E, INDV / Galmudug M&E IDA / D4970 Prior Consultant Limited 20,000.00 0.00 Canceled 2020-04-04 2020-04-07 2020-04-09 2020-04-16 2020-05-06 2021-05-01 Knowledge Management and Specialist Selection Learning Component 4: Project SO-MOPIED-FGS-167352-CS- Individual Management, M & E, INDV / Galmudug State IDA / D4970 Prior Consultant Limited 40,000.00 40,320.00 Completed 2020-04-04 2020-04-08 2020-04-09 2020-04-23 2020-04-23 2020-04-24 2020-05-14 2020-04-25 2021-05-14 2020-07-13 Knowledge Management and Project Coordinator Selection Learning Component 4: Project SO-MOPIED-FGS-161176-CS- Individual Management, M & E, INDV / Southwest State M&E IDA / D4970 Prior Consultant Limited 90,000.00 0.00 Canceled 2020-02-29 2020-04-04 2020-03-05 2020-03-26 2020-04-19 2021-04-19 Knowledge Management and Specialist Selection Learning Component 4: Project SO-MOPIED-FGS-172875-CS- Individual Management, M & E, INDV / Communications IDA / D4970 Prior Consultant Open 60,000.00 0.00 Canceled 2020-05-11 2020-05-14 2020-06-29 2020-07-20 2020-08-24 2021-08-24 Knowledge Management and Specialist Selection Learning SO-MOPIED-FGS-177912-CS- INDV / Consultant to develop Individual Component 2. Institutional Environmental and Social IDA / D4970 Prior Consultant Limited 40,000.00 40,500.00 Signed 2020-06-20 2020-07-07 2020-06-25 2020-07-01 2020-07-16 2020-07-22 2020-08-20 2020-07-23 2020-11-18 and Capacity Development Impact Assessment (ESIA) Selection Regulations SO-MOPIED-FGS-185438-CS- Individual Component 2. Institutional INDV / Capacity Needs IDA / D4970 Prior Consultant Limited 20,000.00 24,750.00 Signed 2020-07-25 2020-07-29 2020-07-30 2020-12-06 2020-08-20 2020-12-11 2020-09-24 2020-12-12 2020-11-08 and Capacity Development Assessment Specialist Selection Component 4: Project SO-MOPIED-FGS-197728-CS- Individual Management, M & E, Under INDV / Communications IDA / D4970 Prior Consultant Open 60,000.00 0.00 2020-10-07 2020-10-08 2020-11-25 2020-12-16 2021-01-20 2022-01-15 Knowledge Management and Implementation Specialist Selection Learning SO-MOPIED-FGS-201433-CS- Individual Component 2. Institutional INDV / Biyoole Finance Officer IDA / D4970 Prior Consultant Limited 24,000.00 36,060.00 Signed 2020-11-02 2020-11-05 2020-11-07 2021-02-20 2020-11-28 2021-02-26 2021-01-02 2021-03-01 2021-12-28 and Capacity Development for MoF Selection Component 3: Supporting SO-MOPIED-FGS-221279-CS- Sustainable Land Individual INDV / Senior Livestock IDA / D4970 Management and Livelihoods Prior Consultant Limited 18,000.00 18,000.00 Signed 2021-02-26 2021-03-17 2021-03-03 2021-04-28 2021-03-24 2021-05-09 2021-04-28 2021-05-14 2021-10-25 Consultant Development Around Water Selection Points Component 3: Supporting SO-MOPIED-FGS-221285-CS- Sustainable Land Individual INDV / Preparation of Under IDA / D4970 Management and Livelihoods Prior Consultant Limited 18,000.00 0.00 2021-02-27 2021-04-15 2021-03-04 2021-03-25 2021-04-29 2021-10-26 Extension Strategy, Guidelines Implementation Development Around Water Selection and Manuals Points Component 3: Supporting SO-MOPIED-FGS-221286-CS- Sustainable Land Individual Under INDV / Consultant to Draft IDA / D4970 Management and Livelihoods Prior Consultant Limited 18,000.00 0.00 2021-02-27 2021-05-25 2021-03-04 2021-03-25 2021-04-29 2021-10-26 Implementation Agricultural Land Use policy Development Around Water Selection Points SO-MOPIED-FGS-228060-CS- Component 4: Project Individual INDV / Biyoole II Project Management, M & E, IDA / D4970 Prior Consultant Limited 40,000.00 30,000.00 Signed 2021-04-15 2021-05-10 2021-04-20 2021-05-31 2021-05-11 2021-06-08 2021-06-15 2021-06-14 2021-12-12 Proposal Development Knowledge Management and Selection Specialist Learning SO-MOPIED-FGS-235874-CS- Component 4: Project CDS / QUALITY Management, M & E, Under ENHANCEMENT AND IDA / D4970 Prior Direct Selection Direct 900,000.00 0.00 2021-05-28 2021-06-10 2021-06-07 2021-08-11 2022-08-11 Knowledge Management and Implementation IMPLEMENTATION SUPPORT Learning AGENCY SO-MOPIED-FGS-238147-CS- Component 4: Project Individual INDV / Communications, Management, M & E, IDA / D4970 Prior Consultant Open 60,000.00 0.00 Under Review 2021-06-19 2021-08-07 2021-08-28 2021-10-02 2022-10-02 Monitoring and Evaluation Knowledge Management and Selection Specialist Learning Page 2 PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Central African Republic : Central African Republic Human Capital and Women and Girls' Empowerment (Maïngo) Project PLAN General Information Country: Central African Republic Bank’s Approval Date of the Original Procurement Plan: 2021-05-21 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171158 GPN Date: Project Name: Central African Republic Human Capital and Women and Girls' Empowerment (Maïngo) Project Loan / Credit No: IDA / V3650 Ministry of Economy, Planning and Cooperation Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual National CF-MEPC-235801-CW-RFQ / Increase access to systems Procurement Rénovation des CEFPA that improve health, Pending Request for Single Stage - One Document - 1 2022-08- identifiés avec le soutien IDA / V3650 education and employment Post Limited 0.00 Implementat 2022-01-05 2022-03-02 Quotations Envelope Envelope 29 d’une firme d’ingénierie opportunities of women and ion process (Non spécialisée girls. Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-MEPC-234093-GO-RFQ / National capacity building, Acquisition de matériels et Pending communication campaigns to Request for Single Stage - One accessoires pour la mise en IDA / V3650 Post Limited 0.00 Implementati 2021-09-05 2021-10-31 2022-04-29 empower women and girls Quotations Envelope place du système de vidéo- on and project management conférence CF-MEPC-234101-GO-RFQ / National capacity building, Acquisition, installation et Pending communication campaigns to Request for Single Stage - One mise en service de système de IDA / V3650 Post Limited 0.00 Implementati 2021-11-03 2021-12-29 2022-06-27 empower women and girls Quotations Envelope communication internet par on and project management VSAT CF-MEPC-234098-GO-RFQ / National capacity building, Pending Mobiliers et accessoire de communication campaigns to Request for Single Stage - One IDA / V3650 Post Limited 0.00 Implementati 2021-09-05 2021-10-31 2022-04-29 bureau pour la Coordination empower women and girls Quotations Envelope on du projet and project management CF-MEPC-234099-GO-RFQ / National capacity building, Pending Matériels informatiques communication campaigns to Request for Single Stage - One IDA / V3650 Post Limited 0.00 Implementati 2021-10-05 2021-11-30 2022-05-29 (Ordinateurs, imprimantes, empower women and girls Quotations Envelope on serveur, tablettes etc.) and project management CF-MEPC-234100-GO-RFQ / National capacity building, Pending Acquisition de logiciel de communication campaigns to Request for Single Stage - One IDA / V3650 Post Limited 0.00 Implementati 2022-01-05 2022-03-02 2022-08-29 gestion financière et empower women and girls Quotations Envelope on comptable and project management National capacity building, CF-MEPC-235788-GO-RFQ / Pending communication campaigns to Single Stage - One Achat de deux véhicules pour IDA / V3650 Post Request for Bids Open - National 0.00 Implementati 2021-12-31 2022-01-05 2022-02-16 2022-03-18 2022-04-22 2022-10-19 empower women and girls Envelope la coordination du projet on and project management National capacity building, CF-MEPC-235790-GO-RFQ / Pending communication campaigns to Request for Single Stage - One Achat de dispositif de lutte IDA / V3650 Post Limited 0.00 Implementati 2021-11-03 2021-12-29 2022-06-27 empower women and girls Quotations Envelope contre le COVID 19 on and project management Increase access to systems CF-MEPC-235804-GO-RFQ / that improve health, Pending Request for Single Stage - One Achat d’équipements pour les IDA / V3650 education and employment Post Limited 0.00 Implementati 2022-05-23 2022-07-18 2023-01-14 Quotations Envelope six centres de formations opportunities of women and on girls. CF-MEPC-235795-GO-RFQ / Establishing Safe Spaces and Pending Request for Single Stage - One Achat d'équipements pour les IDA / V3650 Clubs to deliver integrated Post Limited 0.00 Implementati 2022-03-20 2022-05-15 2022-11-11 Quotations Envelope Espaces Surs et Clubs community-based programs. on CF-MEPC-235785-GO-RFQ / National capacity building, Panneaux solaires ou Pending communication campaigns to Request for Single Stage - One générateurs d'énergie et IDA / V3650 Post Limited 0.00 Implementati 2021-12-05 2022-01-30 2022-07-29 empower women and girls Quotations Envelope accessoires électriques pour on and project management la coordination du projet National capacity building, CF-MEPC-236364-GO-RFQ / Pending communication campaigns to Request for Single Stage - One Acquisition de matériels de IDA / V3650 Post Limited 0.00 Implementati 2022-01-05 2022-03-02 2022-08-29 empower women and girls Quotations Envelope climatisation on and project management NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-MEPC-234103-NC-RFQ / National capacity building, Pending Entretien et nettoyage des communication campaigns to Request for Single Stage - One IDA / V3650 Post Limited 0.00 Implementati 2021-10-05 2021-11-30 2022-05-29 bureaux de la Coordination du empower women and girls Quotations Envelope on Projet and project management National capacity building, CF-MEPC-234102-GO-RFQ / Pending communication campaigns to Request for Single Stage - One Location de bureau pour la IDA / V3650 Post Limited 0.00 Implementati 2021-11-03 2021-12-29 2022-06-27 empower women and girls Quotations Envelope Coordination du projet on and project management CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-MEPC-234397-CS-INDV / National capacity building, Consultant Recrutement des consultants communication campaigns to Pending IDA / V3650 Post Qualification Open - National 0.00 2022-01-31 2022-02-21 2022-04-06 2022-05-06 2022-06-10 2022-12-07 pour mener les études pour empower women and girls Implementation Selection composante 3 (court-terme) and project management CF-MEPC-234399-CS-INDV / National capacity building, Recrutement consultant pour Consultant communication campaigns to Pending développer les boites à outils IDA / V3650 Post Qualification Limited 0.00 2022-02-28 2022-03-14 2022-04-13 2022-05-18 2022-11-14 empower women and girls Implementation (des supports de Selection and project management communication imagés CF-MEPC-235799-CS-CQS / Recrutement d'un consultant Increase access to systems pour l'élaboration d'un that improve health, Consultant manuel pour les bourses et Pending IDA / V3650 education and employment Post Qualification Limited 0.00 2022-06-10 2022-06-24 2022-07-24 2022-08-28 2023-02-24 les COGEDES (élaboration des Implementation opportunities of women and Selection lignes directrices du PREAAFA girls. et du manuel des subventions scolaires CF-MEPC-234365-CS-QCBS Increase access to systems / Etudes ethnographiques à that improve health, Consultant Pending base communautaire dans les IDA / V3650 education and employment Post Qualification Limited 0.00 2021-12-01 2021-12-15 2022-01-14 2022-02-18 2022-08-17 Implementation zones du projet (composante opportunities of women and Selection n°1) girls. CF-MEPC-234367-CS-QCBS Increase access to systems / Etudes sur le ciblage sur les that improve health, Consultant Pending aspects liés à l'éducation pour IDA / V3650 education and employment Post Qualification Limited 0.00 2021-12-31 2022-01-14 2022-02-13 2022-03-20 2022-09-16 Implementation éclairer la mise en œuvre des opportunities of women and Selection programmes girls. Increase access to systems CF-MEPC-234361-CS-INDV / that improve health, Consultant Evaluation des systèmes de Pending IDA / V3650 education and employment Post Qualification Limited 0.00 2022-05-11 2022-05-25 2022-06-24 2022-07-29 2023-01-25 paiement existants dans les Implementation opportunities of women and Selection zones du projet girls. CF-MEPC-235811-CS-QCBS / Recrutement d'un cabinet National capacity building, pour coordonner et gérer la Consultant communication campaigns to Pending campagne de communication IDA / V3650 Post Qualification Limited 0.00 2022-08-26 2022-09-09 2022-10-09 2022-11-13 2023-05-12 empower women and girls Implementation nationale pour Selection and project management l'autonomisation des femmes et des filles CF-MEPC-235814-CS-QCBS National capacity building, / Contractualisation de Consultant communication campaigns to Pending partenaires d’exécution pour IDA / V3650 Post Qualification Limited 0.00 2022-12-31 2023-01-14 2023-02-13 2023-03-20 2023-09-16 empower women and girls Implementation l’appui à la mise en œuvre et Selection and project management la supervision. CF-MEPC-235819-CS-QCBS National capacity building, / Elaboration des documents Consultant communication campaigns to Pending de sauvegardes pour la IDA / V3650 Post Qualification Limited 0.00 2022-12-30 2023-01-13 2023-02-12 2023-03-19 2023-09-15 empower women and girls Implementation réhabilitation des six centres Selection and project management de formation professionnelle CF-MEPC-235800-CS-CQS / Increase access to systems Cabinet pour évaluer et that improve health, Consultant Pending élaborer le dossier technique IDA / V3650 education and employment Post Qualification Limited 0.00 2021-12-31 2022-01-14 2022-02-13 2022-03-20 2022-09-16 Implementation de la réhabilitation des six opportunities of women and Selection centres de formation girls. CF-MEPC-235791-NC-RFP / Recrutement d'une ONG pour Establishing Safe Spaces and Consultant Pending travailler avec le IDA / V3650 Clubs to deliver integrated Post Qualification Limited 0.00 2021-12-31 2022-01-14 2022-02-13 2022-03-20 2022-09-16 Implementation Gouvernement pour le design community-based programs. Selection des Espaces Surs et Clubs CF-MEPC-235793-CS-QCBS / Recrutement d'une assistance technique pour l'élaboration des espaces surs Establishing Safe Spaces and Consultant Pending et club (communautaires et en IDA / V3650 Clubs to deliver integrated Post Qualification Open - National 0.00 2021-12-31 2022-01-21 2022-03-06 2022-04-05 2022-05-10 2022-11-06 Implementation milieu scolaire), les community-based programs. Selection discussions sur le genre et la sexualité en milieu et la formation des mentors CF-MEPC-235797-CS-CQS / Recrutement d'un consultant Increase access to systems pour effectuer l'étude de that improve health, Consultant faisabilité pour les cases de Pending IDA / V3650 education and employment Post Qualification Limited 0.00 2022-05-16 2022-05-30 2022-06-29 2022-08-03 2023-01-30 santé pour accueillir les Implementation opportunities of women and Selection femmes enceintes vivantes girls. dans les zones difficiles et éloignées des centres de santé CF-MEPC-235798-CS-CQS / Increase access to systems Etude sur les aspects liés pour that improve health, Consultant Pending réviser la stratégie de IDA / V3650 education and employment Post Qualification Limited 0.00 2022-04-15 2022-04-29 2022-05-29 2022-07-03 2022-12-30 Implementation communication sur la santé opportunities of women and Selection communautaire girls. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-MEPC-234379-CS-INDV / National capacity building, Individual Recrutement du Spécialiste en communication campaigns to Pending IDA / V3650 Post Consultant Open 0.00 2021-12-31 2022-02-18 2022-03-11 2022-04-15 2022-10-12 système de paiement et base empower women and girls Implementation Selection de données and project management Page 2 National capacity building, CF-MEPC-234390-CS-INDV / Individual communication campaigns to Under Recrutement de deux (02) IDA / V3650 Post Consultant Limited 0.00 2021-12-31 2021-06-15 2022-01-05 2022-01-26 2022-03-02 2022-08-29 empower women and girls Implementation Conducteurs de véhicule Selection and project management National capacity building, Individual CF-MEPC-232665-CS-INDV / communication campaigns to Under IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 Coordonnateur du projet empower women and girls Implementation Selection and project management National capacity building, CF-MEPC-234372-CS-INDV / Individual communication campaigns to Under Recrutement du spécialiste IDA / V3650 Post Consultant Open 0.00 2022-03-31 2021-06-01 2022-05-19 2022-06-09 2022-07-14 2023-01-10 empower women and girls Implementation en sécurité au niveau national Selection and project management National capacity building, CF-MEPC-234384-CS-INDV / Individual communication campaigns to Under Recrutement de l’assistant de IDA / V3650 Post Consultant Limited 0.00 2021-12-31 2021-06-15 2022-01-05 2022-01-26 2022-03-02 2022-08-29 empower women and girls Implementation direction Selection and project management National capacity building, CF-MEPC-234386-CS-INDV / Individual communication campaigns to Under Recrutement de Chargé de IDA / V3650 Post Consultant Limited 0.00 2021-10-30 2021-06-15 2021-11-04 2021-11-25 2021-12-30 2022-06-28 empower women and girls Implementation liaison Selection and project management CF-MEPC-234395-CS-QCBS / Recrutement d'un consultant pour l'élaboration d'une étude Establishing Safe Spaces and Individual la composante 1 Pending IDA / V3650 Clubs to deliver integrated Post Consultant Limited 0.00 2021-12-31 2022-01-05 2022-01-26 2022-03-02 2022-08-29 (identification des lieux, Implementation community-based programs. Selection détermination des activités, définition des besoins et estimation des coûts) National capacity building, CF-MEPC-232673-CS-INDV / Individual communication campaigns to Under Spécialiste en Passation des IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation Marchés Selection and project management National capacity building, Individual CF-MEPC-232675-CS-INDV / communication campaigns to Under IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 Auditeur Interne empower women and girls Implementation Selection and project management National capacity building, CF-MEPC-232681-CS-INDV / Individual communication campaigns to Under Spécialiste en Suivi et IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation Evaluation Selection and project management National capacity building, Individual CF-MEPC-232683-CS-INDV / communication campaigns to Under IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 Comptables du Projet empower women and girls Implementation Selection and project management National capacity building, CF-MEPC-232695-CS-INDV / Individual communication campaigns to Under Spécialiste des VBG (Violences IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation Basées sur le Genre) Selection and project management CF-MEPC-232689-CS-INDV / National capacity building, Individual Spécialiste Environnement en communication campaigns to Under IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 sauvegarde sociale en charge empower women and girls Implementation Selection de l'animation du CGES and project management National capacity building, CF-MEPC-236280-CS-INDV / Individual communication campaigns to Under Spécialiste en sauvegardes IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-15 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation sociales Selection and project management CF-MEPC-235806-CS-QCBS National capacity building, / Recrutement d’un Individual communication campaigns to Pending consultant pour le IDA / V3650 Post Consultant Limited 0.00 2021-12-31 2022-01-05 2022-01-26 2022-03-02 2022-08-29 empower women and girls Implementation Développement du plan de Selection and project management renforcement de sept ministères CF-MEPC-235809-CS-QCBS / Recrutement d’un National capacity building, Individual consultant pour élaborer le communication campaigns to Pending IDA / V3650 Post Consultant Limited 0.00 2021-12-31 2022-01-05 2022-01-26 2022-03-02 2022-08-29 cadre organique et empower women and girls Implementation Selection fonctionnement de and project management l’observatoire du capital humain CF-MEPC-235796-CS-CQS / Recrutement d'une consultant pour mener une étude pour Increase access to systems évaluer les agents de santé that improve health, Individual Pending communautaires existants en IDA / V3650 education and employment Post Consultant Limited 0.00 2021-12-31 2022-01-05 2022-01-26 2022-03-02 2022-08-29 Implementation RCA (y compris leur champ opportunities of women and Selection d'activité, le niveau des girls. incitations, le type de formation) National capacity building, CF-MEPC-232674-CS-INDV / Individual communication campaigns to Under Spécialiste en Gestion IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-15 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation Financière (International) Selection and project management National capacity building, CF-MEPC-234381-CS-INDV / Individual communication campaigns to Under Recrutement Chargé de IDA / V3650 Post Consultant Open 0.00 2021-12-31 2021-06-15 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation communication Selection and project management CF-MEPC-235817-CS-QCBS National capacity building, Individual / Pilotage de la mise en œuvre communication campaigns to Pending IDA / V3650 Post Consultant Open 0.00 2021-12-31 2022-02-18 2022-03-11 2022-04-15 2022-10-12 des programmes dans empower women and girls Implementation Selection certaines communautés and project management Page 3 WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months) I. General The following procurement plan has been developed for project implementation during the first eighteen months and provides the basis for the procurement methods and bank prior/post review thresholds. It covers the three categories, namely, Works; Consultancies; and Goods. The plan will be updated when need arises to reflect the actual project implementation needs. 1. Project information: Country / Borrower: Republic of Kenya Project: Water and Sanitation Development Project (WSDP) IDA Credit No. 6029 & 6030 Project Implementing Agencies: (a) Ministry of Water and Irrigation, (b) WaSREB, (c) Water Service Providers: Kilifi-Mariakani Water and Sewerage Company (Kimawasco),; Taita-Voi Water and Sewerage Company (Tavevo); Mombasa Water Supply and Sanitation Company (Mowassco); Kwale Water and Sewerage Company (Kwawasco); Garissa Water and Sewerage Company (Gawasco); Wajir Water and Sewerage Company (Wajwasco); and Malindi Water and Sewerage Company; and (d) Counties: Kilifi; Taita Taveta; Mombasa; Kwale; Garissa; and Wajir 2. Bank’s approval Date of the First Eighteen Months’ Procurement Plan: June 15, 2017 3. Date of General Procurement Notice: June 14, 2017 4. Period covered by this procurement plan: June 2017 to December 2018 II: Works, Goods and Consultancy Services: Thresholds for Procurement Methods and Bank’s Prior Review The Table below provides the details of Thresholds for Procurement Methods and Bank’s Prior Review for Works, Goods and Consultancy Services Page 1 of 2 Contract Value (Threshold) Procurement Expenditure Contract Subject to Category (US$ 000) Method Prior Review 1. Works 15,000 or more ICB Contracts above $5 million Below 15,000 NCB First contract per entity and Contracts above $5 million Below or equal Shopping None unless contract 200 specified in the PP No threshold Direct As specified in PP Contracting 2. Goods 1,000 or more ICB First contract per entity and Contracts above $1.5 million Below 1,000 NCB First contract per entity Below or equal Shopping None unless contract to 100 specified in the PP No threshold Direct As specified in PP Contracting 3. Consultancy Firms* QCBS,LCS,FBS, First contract per Services QBS entity and Contracts above $0.5 million Firms* CQS First contract per (Estimated cost entity less than $300,000) Individual IC (at least 3 All contract of CVs) estimated cost above $200,000 and more No threshold Single Source All *Assignments whose estimated cost is less $300,000 could be Open-National (Shortlist could comprise of all national firms) NB: All terms of reference for consulting services will be subject to IDA’s prior review. Page 2 of 2 PROCUREMENT Kenya : Water and Sanitation Development Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2017-12-04 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156634 GPN Date: 2017-06-13 Project Name: Water and Sanitation Development Project Loan / Credit No: IDA / 60300 W Executing Agency(ies): ater Services Regulatory Board WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE- WASREB-34817-GO-RFB / Procurement of 2No four Component 3: National wheel drive vehicles for performance-based financing Single Stage - One IDA / 60300 Prior Request for Bids Open - National 160,000.00 0.00 Canceled 2017-12-15 2018-10-24 2017-12-20 2018-01-31 2018-03-02 2018-04-06 2018-10-03 monitoring the (PBF) (US$40.7 of which IDA- Envelope implementation of the SUF US$37 million). performance based financing KE- WASREB-187622-GO- RFB / Procurement of 2No Component 3: National Four Wheel Drive vehicles for performance-based financing Single Stage - One monitoring the IDA / 60300 Post Request for Bids Open - National 160,000.00 0.00 Canceled 2020-08-20 2020-09-02 2020-08-20 2020-09-02 2020-09-10 2020-09-22 2020-09-24 2020-10-23 2020-10-22 2020-12-04 (PBF) (US$40.7 of which IDA- Envelope implementation of the SUF US$37 million). Performance Based Financing project activities Component 3: National KE- WASREB-229657-GO- Under performance-based financing Single Stage - One RFB / Supply and Delivery of IDA / 60300 Post Request for Bids Open - National 250,000.00 0.00 Implementati 2021-04-23 2021-05-27 2021-04-28 2021-05-27 2021-06-09 2021-05-18 2021-07-09 2021-06-15 2021-08-13 2022-02-09 (PBF) (US$40.7 of which IDA- Envelope Two 4x4 Utility Motor Vehicles on SUF US$37 million). NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE- WASREB-34809-CS- QCBS / Technical assistance Component 3: National for management, performance-based financing Quality And Cost- IDA / 60300 Prior Open - International 1,000,000.00 0.00 Canceled 2017-12-15 2018-07-25 2018-01-05 2018-08-26 2018-02-18 2019-12-11 2018-03-18 2020-05-11 2018-04-17 2020-09-07 2018-05-22 2018-06-26 2019-06-26 implementation and (PBF) (US$40.7 of which IDA- Based Selection coordination, monitoring and SUF US$37 million). evaluation of the National Performance based Financing KE- WASREB-229126-CS- QCBS / Needs identification Component 3: National and proposal of a working performance-based financing Quality And Cost- IDA / 60300 Post Open - National 50,000.00 0.00 Under Review 2021-04-27 2021-06-15 2021-05-18 2021-07-01 2021-07-29 2021-08-28 2021-10-02 2021-11-06 2022-11-06 solution for a Citizen (PBF) (US$40.7 of which IDA- Based Selection Engagement mechanism for SUF US$37 million). WASREB Component 3: National KE- WASREB-235524-CS- performance-based financing Quality And Cost- Under QCBS / Consultancy services IDA / 60300 Post Open - International 200,000.00 0.00 2021-05-20 2021-05-27 2021-06-10 2021-07-24 2021-08-21 2021-09-20 2021-10-25 2021-11-29 2022-11-29 (PBF) (US$40.7 of which IDA- Based Selection Implementation for upgrade of Majidata SUF US$37 million). KE- WASREB-236373-CS- Component 4: Project QCBS / Consultancy services management (US$3.3 million Quality And Cost- for development of an IDA / 60300 Post Open - National 200,000.00 0.00 Under Review 2021-05-28 2021-06-15 2021-06-18 2021-08-01 2021-08-29 2021-09-28 2021-11-02 2021-12-07 2022-12-07 of which IDA-SUF US$3 Based Selection Integrated Management million). System KE- WASREB-236377-CS- Component 4: Project QCBS / Consultancy services management (US$3.3 million Quality And Cost- for Development of National IDA / 60300 Post Open - National 500,000.00 0.00 Under Review 2021-05-28 2021-05-27 2021-06-18 2021-08-01 2021-08-29 2021-09-28 2021-11-02 2021-12-07 2022-12-07 of which IDA-SUF US$3 Based Selection Guidelines for Results Based million). Financing (RBF) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Hezhou Urban Water Infrastructure and Environment Improvement Project PPSD and Procurement Plan Procurement Plan of Hezhou Urban Water Infrastructure and Environment Improvement Project Project information: Country: The People’s Republic of China Borrower: The People’s Republic of China Project Name: Hezhou Urban Water Infrastructure and Environment Project Financed by the World Bank Loan Loan/Credit No: IBRD 8865-CN Project ID: P158622 Project Implementation Agency (PIA): The PIA includes the Project Management Office (PMO), which refers to Hezhou Municipal World Bank Loan Project Management Office (Hezhou PMO), and the Project Implementation Units (PIUs), which refer to Hezhou Municipal Water Resources Bureau (HWRB), Hezhou Municipal Engineering Administration Bureau (HMEAB) and Hezhou Municipal Environmental Protection Bureau (HEPB). Name of Components PIUs Component 1: Improving He River Flood HWRB Risk Resilience HWRB (Urban Drainage Improvement); Component 2: Improving Urban Drainage HMEAB (Water Bodies and Quality and Wastewater Management Improvement, Ecological Landscape Improvement) 1 Hezhou Urban Water Infrastructure and Environment Improvement Project PPSD and Procurement Plan HWRB (Big Data Intelligent Water Management and Control Platform etc.); Component 3: Institutional Strengthening, HEPB (Hezhou Drainage Basin Water Capacity Building and Project Environmental Monitoring, Early-warning and Management Comprehensive Management System etc.); Hezhou PMO (Project Management and Oversight etc.) Date of the Procurement Plan: May 30, 2018 Period covered by this Procurement Plan: 2018-2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. A. The Bank’s Standard Procurement Documents (SPDs): The Bank’s SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures (Tendering and Bidding Law of the Peoples’ Republic of China, i.e. TBL promulgated by its Order No. 21 dated August 30, 1999 and the Implementation Regulations of the TBL promulgated by its State Council Order No. 613 dated November 30, 2011 and any amendments thereof) may be used with the following conditions to meet the requirements for open competitive procurement of paragraph 5.4 of the Procurement Regulations: 2 Hezhou Urban Water Infrastructure and Environment Improvement Project PPSD and Procurement Plan a. All procurement notices shall be published in a national newspaper of wide circulation, or on a widely-used website / electronic portal with free access. b. A minimum of twenty (20) business days shall be given to Bidders between the date of such advertisement (or the date of availability of procurement documents, whichever is later and the deadline for the submission of bids). The advertisement and procurement documents shall specify the deadline for the submission of bids. Potential Bidders shall be allowed to inspect and purchase procurement documents at any time prior to the deadline for the submission of bids. c. Any Bidder/Consultant should be eligible to participate in a procurement process and to be awarded a Bank-financed contract as defined in paragraphs 3.21, 3.22 and 3.23 of the Procurement Regulations. d. Bidders/Consultants shall be allowed to submit bids/proposals by mail or in person. Bidders/consultants shall not be mandatory required to be present at the bid/proposal opening session. e. Bidders should not be required to register as a condition for inspecting or purchasing procurement documents, submitting its bid or receiving contract award. A winner Bidder, shall be given reasonable opportunity of registering (if required) before contract signing without any let or hindrance. Bidding shall not be restricted to any class of contractors. f. The winning bidder shall not be required, as a condition of award, to reduce its bid price No contract negotiation shall be permitted unless agreed in the procurement plan. g. No bid may be rejected solely on the basis that the bid price exceeds any cost estimate. Rejection of all bids or re-bidding shall not be allowed solely because the number of bids is less than three (3). Rebidding shall not take place without any sound justification. h. The Bank’s procurement documents for approaching the national market or any procurement document acceptable to the Bank shall be used. All procurement documents must require that bidders/consultants present a signed acceptance at the time of bidding or submitting a proposal, to be incorporated in any resulting contract, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i. The procurement documents shall disclose the newspaper and / or the electronic means in which the information on contract award shall be published. 3 Hezhou Urban Water Infrastructure and Environment Improvement Project PPSD and Procurement Plan j. The contract award notification shall identify: (a) name and address of the Borrower’s Project Implementing Unit, (b) name and reference number of the contract being awarded and the selection method used (c) names of all Bidders/Consultants that submitted bids/proposals and their prices as read out at the bid opening meeting and as evaluated (d) names of all Bidders/ Consultants whose bids/proposals were rejected either as nonresponsive or as not meeting qualification criteria or were not evaluated, with the reasons therefor and (e) the name of the successful Bidder/Consultant, the final contract price, the contract duration and a summary of its scope. k. The Borrower shall implement an effective complaint mechanism allowing bidders or consultants to complain, and have their complaints handled and responded in a timely manner. Procurement documents should indicate the complaint mechanism procedure and provide the professional title and address of the officials to whom such protests should be sent. l. The Bank shall be allowed to review procurement documentation and activities related to the activities included in the procurement plan. C. Other national procurement arrangements: When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. A. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. B. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations is not applicable: C. Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations: Goods: Domestic Preference is applicable for those contracts identified in the Procurement Plan tables. Works: Domestic Preference is not applicable. G. Other Relevant Procurement Information: 4 Hezhou Urban Water Infrastructure and Environment Improvement Project PPSD and Procurement Plan Goods, Works and Non-Consulting Services: Prior Review Threshold: Procurement Decisions are subject to Prior Review by the Bank as stated in Annex II to the Procurement Regulations (July 2016, revised November 2017). Procuremen Contract t Value Procurement Method Bank Prior Review Category (US$) Goods, IT ≥ 10 International Open Systems & million Competitive Procurement Non- (International + Open) Consulting Services ≥ 500k to National Open Competitive All contracts ≥ USD 4 Procurement million. < 10 million (National + Open) < 500 K Shopping (RFQ) None Others DS (Direct Selection) All contracts ≥ USD 4 million. Works, ≥ 40 International Open Supply & million Competitive Procurement Installation (International + Open) ≥ 500k to National Open Competitive All contracts ≥ USD 15 Procurement million. < 40 million (National + Open) < 500 K Shopping (RFQ) None N/A DS (Direct Selection) All contracts ≥ USD 15million. Notes: DS: Direct Selection NA: Not Applicable Procurement Packages with Methods and Time Schedule: 5 Hezhou Urban Water Infrastructure and Environment Improvement Project PPSD and Procurement Plan Selection of Consultants: Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II to the Procurement Regulations (July 2016, revised November 2017): Procurem Contract Value Selection ent Bank Prior Review (US$) Method Category ≥ 300,000 QCBS, QBS, Firms: All contracts >=USD 2 million; QCBS, QBS, < 300,000 FBS, LCS, Firms: All DS contracts >= Consultant CQS USD 1 million; s Others DS Individual Consultant: All contracts >=400 K; Others IC DS for individual consultant: All contracts>=USD 400 K Notes: QCBS: Quality- and Cost-Based Selection DS: Direct Selection QBS: Quality-Based Selection IC: Individual Consultant selection procedure FBS: Fixed Budget Selection NA: Not Applicable LCS: Least Cost Selection CQS: Consultants’ Qualifications-based Selection 6 PROCUREMENT China : Hezhou Urban Water Infrastructure and Environment Improvement Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-08-30 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158622 GPN Date: 2018-07-09 Project Name: Hezhou Urban Water Infrastructure and Environment Improvement Project Loan / Credit No: IBRD / 88650 H Executing Agency(ies): ezhou PMO WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned HZ-SZ-7 / Huang'ansi and Component 2: Improving Shizigang Flood Drainage Single Stage - One 30,022,788.6 22,538,438. 2020-12- IBRD / 88650 Urban Drainage and Prior Request for Bids Open - National Signed 2018-09-14 2018-11-07 2018-09-29 2018-11-12 2018-10-29 2018-12-18 2018-11-28 2019-05-06 2019-01-02 2019-06-03 Rivers Comprehensive Envelope 5 05 22 Wastewater Management Treatment HZ-SL-1 / He River (Huangshi Hydropower Station- Hejiang Bridge) Component 1: Improving He Pending Single Stage - One 27,627,400.0 2024-05- Comprehensive Treatment IBRD / 88650 River Flood Risk Resilience of Prior Request for Bids Open - National 0.00 Implementat 2021-01-06 2021-02-20 2021-03-22 2021-04-21 2021-05-26 Envelope 0 10 (excluding Huangtiandi flood the He River ion control and drainage project in pinggui district) HZ-SL-1-1 / He River (Huangshi Hydropower Station- Hejiang Bridge) Component 1: Improving He Single Stage - One 6,624,709.6 2022-05- Comprehensive Treatment IBRD / 88650 River Flood Risk Resilience of Post Request for Bids Open - National 6,898,300.00 Signed 2019-12-31 2020-09-21 2020-01-30 2020-10-10 2020-03-15 2020-11-03 2020-04-14 2020-12-05 2020-05-19 2021-01-15 Envelope 8 09 (Huangtiandi flood control the He River and drainage project in pinggui district) HZ-SL-5 / Donggan Canal Component 1: Improving He Pending Single Stage - One 2023-09- Comprehensive Treatment IBRD / 88650 River Flood Risk Resilience of Post Request for Bids Open - National 7,743,800.00 0.00 Implementat 2021-06-16 2021-07-01 2021-07-29 2021-08-28 2021-10-02 Envelope 22 and Mawei River Linkage the He River ion HZ-SL-9 / Huang’ansi and Component 2: Improving Single Stage - One 2022-08- Shizigang Flood Drainage IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 8,363,400.00 0.00 Canceled 2020-11-04 2020-11-25 2020-11-19 2020-12-19 2021-01-20 2021-01-18 2021-04-02 2021-02-22 Envelope 16 Pump Stations (civil wroks) Wastewater Management HZ-SZ-10 / Jiangnan Wastewater Treatment Plant Component 2: Improving Single Stage - One 2020-11- and Auxiliary Pipelines IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 5,577,900.00 0.00 Canceled 2019-02-01 2020-09-14 2019-02-16 2020-10-10 2019-03-18 2020-11-04 2019-04-17 2021-01-29 2019-05-22 Envelope 12 (Jiangnan Wastewater Wastewater Management Treatment Plant) HZ-SL-11 / Lining River and Component 2: Improving Pending Single Stage - One 2023-07- Changlong River IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 8,402,200.00 0.00 Implementat 2021-04-15 2021-05-05 2021-06-04 2021-07-04 2021-08-08 Envelope 29 Reconstruction Wastewater Management ion HZ-SL-12 / Changlong River Component 2: Improving Pending Treatment and Central Spindle Single Stage - One 17,550,800.0 2023-08- IBRD / 88650 Urban Drainage and Prior Request for Bids Open - National 0.00 Implementat 2021-05-05 2021-05-20 2021-06-19 2021-07-19 2021-08-23 Green Belt (Xiufeng Lake) Envelope 0 13 Wastewater Management ion Construction Component 2: Improving Pending HZ-SL-14 / Dongwu Branch Single Stage - One 10,363,100.0 2023-11- IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 0.00 Implementat 2021-08-18 2021-09-02 2021-09-30 2021-10-30 2021-12-04 Canal Reconstruction Project Envelope 0 24 Wastewater Management ion HZ-SZ-8 / Huang’ansi and Shizigang Flood Drainage Component 2: Improving Under Single Stage - One 2022-08- Rivers Comprehensive IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 8,010,800.00 0.00 Implementat 2020-05-04 2021-04-13 2020-05-19 2020-06-18 2020-07-18 2020-08-22 Envelope 12 Treatment Project (Landscape Wastewater Management ion Engineering) HZ-SL-6 / He River (Huangshi Hydropower Station- Component 1: Improving He Pending Single Stage - One 2023-02- Xiadao Hydropower Station) IBRD / 88650 River Flood Risk Resilience of Post Request for Bids Open - National 3,118,300.00 0.00 Implementat 2021-10-15 2021-11-29 2021-12-29 2022-01-28 2022-03-04 Envelope 27 Dredging and Barrier the He River ion Clearance HZ-SL-2-1 / Rehabilitation of Component 1: Improving He Under Single Stage - One 27,711,600.0 2024-02- He River (Hejiang Bridge- IBRD / 88650 River Flood Risk Resilience of Prior Request for Bids Open - National 0.00 Implementat 2020-11-18 2020-12-16 2020-11-23 2021-01-04 2021-01-28 2021-02-03 2021-04-29 2021-03-10 Envelope 0 23 Lingfeng Bridge) the He River ion HZ-SZ-10-3 / Jiangnan Component 2: Improving Pending WWTP and auxiliary pipelines Single Stage - One 2022-03- IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 859,300.00 0.00 Implementat 2021-05-31 2021-06-05 2021-07-17 2021-08-16 2021-09-20 (auxiliary pipelines and roads) Envelope 19 Wastewater Management ion (430-meter road) HZ-SL-13 / Reconstruction project of Huangtian Branch Canal, Gupo Moutain Flood Component 2: Improving Pending Single Stage - One 2024-01- Drainage Canal (Upstream at IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 4,215,500.00 0.00 Implementat 2021-09-30 2021-10-15 2021-11-14 2021-12-14 2022-01-18 Envelope 08 the intersection of Gugpo Wastewater Management ion Mountain Flood Drainage Canal ) HZ-SL-13-1 / Huangtian branch canal, Gupo Mountain flood drainage canal Component 2: Improving Pending Single Stage - One 2021-06- reconstruction project IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 8,272,000.00 0.00 Implementat 2020-12-01 2020-12-06 2021-01-17 2021-02-16 2021-03-23 Envelope 03 (downstream at the Wastewater Management ion intersection of Gupo Mountain flood drainage canal) HZ-SZ-10-1 / Jiangnan Wastewater Treatment Plant Component 2: Improving Under Single Stage - One 22,423,900.0 2023-02- and Auxiliary Pipelines IBRD / 88650 Urban Drainage and Prior Request for Bids Open - National 0.00 Implementat 2021-05-11 2021-05-16 2021-06-27 2021-07-27 2021-08-31 Envelope 0 22 (Auxiliary Pipelines and Wastewater Management ion Roadway) Page 1 HZ-SL-2 / Rehabilitation of He River (Lingfeng Bridge- Component 1: Improving He Pending Single Stage - One 2024-11- Xiadao Power Station), Xiadao IBRD / 88650 River Flood Risk Resilience of Post Request for Bids Open - National 6,172,500.00 0.00 Implementat 2021-07-01 2021-08-15 2021-09-14 2021-10-14 2021-11-18 Envelope 02 Power Station Comprehensive the He River ion Improvement Project HZ-SL-2-2 / Rehabilitation of Component 1: Improving He Pending He River (Hejiang Bridge- Single Stage - One 2022-04- IBRD / 88650 River Flood Risk Resilience of Post Request for Bids Open - National 793,600.00 0.00 Implementat 2021-07-01 2021-07-06 2021-08-17 2021-09-16 2021-10-21 Lingfeng Bridge) (Works for Envelope 19 the He River ion bearizing of Babu Bridge) HZ-HB-18-1 / Environment I Component 3: Institutional Pending mprovement and Auxiliary Fac Strengthening, Capacity Single Stage - One 2022-04- IBRD / 88650 Post Request for Bids Open - National 1,239,500.00 0.00 Implementat 2020-12-31 2021-01-05 2021-02-16 2021-03-18 2021-04-22 ilities Including indoor decor Building and Project Envelope 17 ion ation + outdoor piping Management Component 3: Institutional HZ-HB-16 / Guishi Reservoir Strengthening, Capacity Request for Single Stage - One 2022-01- Automatic Station Upgrade IBRD / 88650 Post Limited 127,500.00 0.00 Canceled 2020-11-19 2021-01-30 Building and Project Quotations Envelope 25 and Reconstruction Management Component 3: Institutional HZ-HB-16-1 / Guishi Under Strengthening, Capacity Request for Single Stage - One 2022-03- Reservoir Automatic Station IBRD / 88650 Post Open - National 127,500.00 0.00 Implementat 2021-01-20 2021-03-17 Building and Project Quotations Envelope 12 Upgrade and Reconstruction ion Management Component 3: Institutional HZ-HB-15-3 / Environmental Strengthening, Capacity Request for 2022-06- Protection and Education IBRD / 88650 Post 472,200.00 0.00 Canceled 2021-04-20 2021-06-15 Building and Project Quotations 10 Basementand Related Systems Management HZ-HB-15-2 / Newly-built 3 Component 3: Institutional Water Quality Monitoring Auto Pending Strengthening, Capacity Request for Single Stage - One 2022-08- matic Stations and Urban Wate IBRD / 88650 Post Open - National 323,100.00 0.00 Implementat 2021-07-05 2021-08-30 Building and Project Quotations Envelope 25 r Quality Monitoring Automati ion Management c Stations CivilWorks Component 3: Institutional HZ-HB-15-1 / Environmental Pending Strengthening, Capacity Request for Single Stage - One 2022-06- Protection and Education IBRD / 88650 Post Limited 472,200.00 0.00 Implementat 2021-04-15 2021-06-26 Building and Project Quotations Envelope 21 Basementand Related Systems ion Management HZ-SL-4 / Huangshi Component 1: Improving He Pending Hydropower Station Single Stage - One 2023-08- IBRD / 88650 River Flood Risk Resilience of Post Request for Bids Open - National 5,351,300.00 0.00 Implementat 2021-04-30 2021-05-15 2021-06-12 2021-07-12 2021-08-16 Comprehensive Improvement Envelope 06 the He River ion and Reconstruction HZ-SL-3 / Fanglin Hydropower Station Component 1: Improving He Pending Single Stage - One 2022-05- Comprehensive Improvement IBRD / 88650 River Flood Risk Resilience of Post Request for Bids Open - National 1,160,300.00 0.00 Implementat 2021-02-09 2021-02-24 2021-03-24 2021-04-23 2021-05-28 Envelope 23 and Reconstruction (Excluding the He River ion water culture exhibition hall) Request for Bids - HZ-SL-9-2 / Huang’ansi and Component 2: Improving Under Single Stage - One Works (without 2023-03- Shizigang Flood Drainage IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 8,363,400.00 0.00 Implementat 2021-05-20 2021-06-15 2021-06-04 2021-07-04 2021-08-03 2021-09-07 Envelope prequalification) 01 Pump Station (Equipment) Wastewater Management ion SPD HZ-SZ-10-4 / Jiangnan Request for Bids - Wastewater Treatment Plant Works (without Component 2: Improving Under and Auxiliary Pipelines Single Stage - One prequalification) 2022-09- IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 2,872,300.00 0.00 Implementat 2021-06-10 2021-06-11 2021-06-15 2021-07-27 2021-08-26 2021-09-30 (Jiangnan Wastewater Envelope SPD - Applying 25 Wastewater Management ion Treatment Plant-Civil contractor Engineering) disqualificiation HZ-SL-2-1 RE / Hejiang (H National ejiang Bridge-Lingfeng Bridge Component 1: Improving He Procurement Under Single Stage - One 27,711,600.0 2024-09- ) Comprehensive Treatment Pr IBRD / 88650 River Flood Risk Resilience of Prior Request for Bids Open - National Document - 1 0.00 Implementat 2021-06-21 2021-06-24 2021-06-26 2021-08-07 2021-09-06 2021-10-11 Envelope 0 25 oject(Urban mMiddler Road an the He River Envelope process ion d West Embankment wWorks) (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HZ-HB-20 / Water Component 3: Institutional Environment Automatic Strengthening, Capacity Single Stage - One IBRD / 88650 Post Request for Bids Open - National 726,800.00 767,043.92 Signed 2020-02-04 2019-06-30 2020-02-19 2020-10-10 2020-03-20 2020-08-11 2020-04-19 2020-08-11 2020-05-24 2020-09-28 2021-05-19 Monitoring and Warning Building and Project Envelope System Construction Management Component 3: Institutional HZ-SL-21 / Big Data Pending Strengthening, Capacity Single Stage - One Intelligent Water Management IBRD / 88650 Post Request for Bids Open - National 1,849,300.00 0.00 Implementati 2021-05-11 2021-05-26 2021-06-23 2021-07-23 2021-08-27 2023-02-18 Building and Project Envelope and Control Platform on Management HZ-HB-17 / Monitoring Component 3: Institutional Equipment and Instrument for Strengthening, Capacity Single Stage - One Hezhou Municipal IBRD / 88650 Post Request for Bids Open - National 2,315,000.00 2,338,177.26 Signed 2020-05-06 2020-05-09 2020-05-21 2020-05-09 2020-06-20 2020-07-09 2020-07-20 2020-07-24 2020-08-24 2020-07-24 2021-08-19 Building and Project Envelope Environmental Monitoring Management Station Component 3: Institutional HZ-HB-19 / Environment Strengthening, Capacity Request for Single Stage - One Improvement and Auxiliary IBRD / 88650 Post Limited 42,500.00 45,093.10 Signed 2020-05-28 2020-05-09 2020-08-08 2020-10-20 2021-08-03 Building and Project Quotations Envelope Facilities (Elevators) Management HZ-SZ-10-2 / Jiangnan WWT Component 2: Improving Under P and auxiliary pipelines proje Single Stage - One IBRD / 88650 Urban Drainage and Post Request for Bids Open - National 2,586,666.00 0.00 Implementati 2020-11-18 2020-09-24 2020-11-23 2021-01-04 2020-11-04 2021-02-03 2021-02-01 2021-03-10 2022-09-01 ct Jiangnan WWTP—Equipmen Envelope Wastewater Management on t Component 3: Institutional HZ-HB-18 / Environment Strengthening, Capacity Single Stage - One Improvement and Auxiliary IBRD / 88650 Post Request for Bids Open - National 1,239,500.00 0.00 Canceled 2020-12-25 2021-01-09 2021-02-08 2021-03-10 2021-04-14 2022-04-09 Building and Project Envelope Facilities Management Page 2 HZ-HB-15 / Newly-built 3 W ater Quality Monitoring Autom Component 3: Institutional Pending atic Stations and Urban Water Strengthening, Capacity Single Stage - One IBRD / 88650 Post Request for Bids Open - National 1,276,300.00 0.00 Implementati 2021-06-30 2021-07-20 2021-08-19 2021-09-18 2021-10-23 2022-10-23 Quality Monitoring Automatic Building and Project Envelope on Station cEquipment Purchase Management rocurement HZ-SL-3-1 / Comprehensive Upgrade and Reconstruction Component 1: Improving He Pending Single Stage - One Project of Fanglin Power IBRD / 88650 River Flood Risk Resilience of Post Request for Bids Open - National 708,100.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2022-10-15 Envelope Station (Water Culture the He River on Exhibition Hall) HZ-SL-9-1 / Huang’ansi and Component 3: Institutional Under Shizigang Flood Drainage Strengthening, Capacity Single Stage - One IBRD / 88650 Post Request for Bids Open - National 3,627,500.00 0.00 Implementati 2021-01-15 2021-06-15 2021-02-04 2021-03-06 2021-04-05 2021-05-10 2022-11-01 Pump Stations (goods Building and Project Envelope on procurement) Management NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Institutional HZ-CS-24 / Water Resources Strengthening, Capacity Quality Based Pending Comprehensive Management IBRD / 88650 Post Open - National 500,000.00 0.00 2019-09-15 2019-10-06 2019-11-19 2019-12-17 2020-01-16 2020-02-15 2020-03-21 2020-04-20 Building and Project Selection Implementation Planning Management Component 3: Institutional HZ-CS-23-1 / Project Strengthening, Capacity Quality And Cost- IBRD / 88650 Prior Open - International 3,763,400.00 3,362,844.06 Signed 2019-10-21 2019-10-21 2019-11-04 2019-10-24 2019-12-16 2020-04-07 2020-01-13 2020-06-18 2020-01-27 2020-06-29 2020-03-02 2020-11-14 2020-04-06 2020-12-11 2025-03-11 Supervising Building and Project Based Selection Management Component 3: Institutional HZ-CS-23 / Project Strengthening, Capacity Quality And Cost- IBRD / 88650 Prior Open - International 2,500,000.00 0.00 Canceled 2018-09-27 2019-02-18 2018-10-11 2019-03-28 2018-11-22 2018-12-20 2019-01-03 2019-02-07 2019-03-14 2024-02-16 Supervising Building and Project Based Selection Management Component 3: Institutional HZ-CS-22 / Project Strengthening, Capacity Quality And Cost- IBRD / 88650 Prior Open - International 1,500,000.00 0.00 Canceled 2018-09-20 2018-10-04 2018-11-15 2018-12-13 2019-01-12 2019-02-16 2019-03-23 2024-02-25 Management Building and Project Based Selection Management INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Institutional HZ-CS-25-2 / Dam Safety Individual Strengthening, Capacity Expert Group (Hydraulic IBRD / 88650 Post Consultant Limited 100,000.00 81,877.09 Signed 2018-09-27 2018-11-05 2018-10-11 2018-11-16 2018-11-10 2018-12-18 2019-01-10 2018-12-18 2023-12-15 Building and Project Architecture) Selection Management Component 3: Institutional HZ-CS-25-1 / Dam Safety Individual Strengthening, Capacity Expert Group (Hydraulic IBRD / 88650 Post Consultant Limited 100,000.00 91,073.18 Signed 2018-09-27 2018-11-05 2018-11-15 2018-11-16 2018-12-06 2018-12-18 2019-01-10 2018-12-18 2023-12-15 Building and Project Architecture) Selection Management Component 3: Institutional HZ-CS-25-3 / Dam Safety Individual Strengthening, Capacity Expert Group (Power plants IBRD / 88650 Post Consultant Limited 100,000.00 81,530.91 Signed 2018-09-27 2018-11-05 2018-11-15 2018-11-16 2018-12-06 2018-12-18 2019-01-10 2018-12-18 2023-12-15 Building and Project and power systems) Selection Management Component 3: Institutional Individual HZ-CS-22-3 / Project Strengthening, Capacity Under IBRD / 88650 Post Consultant Open 60,000.00 0.00 2019-10-17 2020-03-10 2019-12-05 2019-12-26 2020-01-30 2025-01-03 Financial Consultant Building and Project Implementation Selection Management Component 3: Institutional Individual HZ-CS-22-4 / Project Costs Strengthening, Capacity Under IBRD / 88650 Post Consultant Open 40,000.00 0.00 2019-10-17 2020-03-10 2019-12-05 2019-12-26 2020-01-30 2021-01-29 Consultant Building and Project Implementation Selection Management Component 3: Institutional Individual HZ-CS-22-1 / Resident Strengthening, Capacity Under IBRD / 88650 Post Consultant Open 80,000.00 0.00 2019-10-17 2020-03-10 2019-12-05 2019-12-26 2020-01-30 2021-01-29 Engineer Building and Project Implementation Selection Management Component 3: Institutional Individual HZ-CS-22-2 / Project Strengthening, Capacity Under IBRD / 88650 Post Consultant Open 60,000.00 0.00 2019-10-17 2020-03-10 2019-12-05 2019-12-26 2020-01-30 2025-01-03 Procurement Consultant Building and Project Implementation Selection Management Page 3 Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412) I. General 1. Bank’s approval Date of the procurement Plan Original: June 2,2016: Revision 3 of Updated Procurement Plan, February 5,2017 2. Date of General Procurement Notice: June 2016 3. Period covered by this procurement plan: The procurement period of project covered, 24 months II. Goods and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Expenditure Contract Value Procurement Contracts Subject to Category (Threshold) Method Prior Review US $ US$ thousand 1.Civil Works Not applicable 2. Goods >600,000 ICB First contract by all entities <600,000 NCB First contract by all entities <100,000 Shopping First contract by all entities Regardless of value Direct Contracting All 2. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 3. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) July 9, 2010 [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 0.2 2 No Post 1st of the NCB contrac (Goods) t for Prior Review III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: 3. Consulting All ToRs and training Services programs to be reviewed by the World Bank’s task team leader (A) Firms >500,000 QCBS, QBS,FBS,LCS, First contract by any process <500,000 CQS, First CQS contract Regardless of value SSS All (B) Individual Up to 200,000 Under Section V (i) First contract Consultants and; (ii) Procurement Specialist regardless of value >200,000 Under Section V All Regardless of value SSS First > 15,000 SSS All July 9, 2010 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 8.5 5 1 Prior/ of number 4 Post of contracts that will be let under QCBS Summary 0.5 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Pakistan : Governance and Policy Project for Balochistan PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2017-06-02 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156411 GPN Date: Project Name: Governance and Policy Project for Balochistan Loan / Credit No: TF / A3352, / Governance and Policy Project Balochistan Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-GPP BALOCHISTAN-14860- Ensuring effective support for GO-RFQ / Purchase of IT the coordination of Request for Single Stage - One Equipment, Backup UPS, TF / A3352 governance reforms and the Post Limited 31,456.00 25,233.88 Signed 2017-05-27 2017-04-05 2017-07-19 2017-06-07 2018-01-15 Quotations Envelope Photocopier, and Android operational management of devices. the GPP Ensuring effective support for PK-GPP BALOCHISTAN-17153- the coordination of Request for Single Stage - One GO-RFQ / Purchase of TF / A3352 governance reforms and the Post Limited 19,417.00 18,200.86 Signed 2017-06-12 2017-05-05 2017-08-04 2017-08-28 2018-01-31 Quotations Envelope Vehicle operational management of the GPP Ensuring effective support for PK-GPP BALOCHISTAN-15656- the coordination of Request for Single Stage - One GO-RFQ / Purchase of Office / governance reforms and the Prior Limited 16,117.00 0.00 Canceled 2017-05-22 2017-06-12 2017-12-09 Quotations Envelope Furniture operational management of the GPP Ensuring effective support for PK-GPP BALOCHISTAN-15657- the coordination of Request for Single Stage - One GO-RFQ / Purchase of TF / A3352 governance reforms and the Prior Limited 19,417.00 0.00 Canceled 2017-05-22 2017-06-12 2017-12-09 Quotations Envelope Vehicle. operational management of the GPP Ensuring effective support for PK-GPP BALOCHISTAN-17213- the coordination of Request for Single Stage - One GO-RFQ / Purchase of TF / A3352 governance reforms and the Prior Limited 16,117.00 0.00 Canceled 2017-06-12 2017-08-04 2018-01-31 Quotations Envelope Furniture. operational management of the GPP PK-GPP BALOCHISTAN-24062- Ensuring effective support for GO-RFQ / Purchase of the coordination of Request for Single Stage - One furniture for office use such TF / A3352 governance reforms and the Post Limited 16,117.00 1,886.20 Signed 2017-08-18 2017-05-05 2017-10-13 2017-11-03 2018-04-11 Quotations Envelope as tables, chairs, file cabinets, operational management of etc. the GPP PK-GPP BALOCHISTAN-39977- Improving public investment GO-RFQ / Purchase of management and Request for Single Stage - One TF / A3352 Post Limited 86,731.00 15,861.50 Signed 2018-01-02 2018-02-07 2018-02-27 2018-08-13 2018-08-26 laptops, desktops, printers, accountability in public Quotations Envelope scanners, etc. services PK-GPP BALOCHISTAN-39984- Improving public investment Under GO-RFQ / Purchase of misc. management and Request for Single Stage - One TF / A3352 Post Limited 25,433.00 0.00 Implementati 2017-12-31 2018-04-19 2018-02-25 2018-08-24 items i.e. generator, camera, accountability in public Quotations Envelope on AC, etc. services Improving public investment PK-GPP BALOCHISTAN-39979- management and Single Stage - One GO-RFQ / Purchase of data TF / A3352 Prior Request for Bids Open - International 608,250.00 0.00 Canceled 2018-01-18 2018-01-23 2018-03-06 2018-04-05 2018-05-10 2018-11-06 accountability in public Envelope center items for BPPRA. services Improving public investment PK-GPP BALOCHISTAN- management and Request for Single Stage - One 111427-GO-RFQ / Purchase TF / A3352 Post Limited 30,770.00 12,008.02 Signed 2019-05-13 2019-08-19 2019-07-08 2019-10-21 2020-01-04 accountability in public Quotations Envelope of IT goods for BPPRA. services Improving public investment PK-GPP BALOCHISTAN- management and Request for Single Stage - One 136610-GO-RFQ / purchase TF / A3352 Post Limited 76,600.00 40,588.92 Signed 2019-10-21 2019-12-21 2019-12-16 2020-03-17 2020-06-13 accountability in public Quotations Envelope of IT goods for CERBM. services Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Request for Single Stage - One 136611-GO-RFQ / Purchase TF / A3352 governance reforms and the Post Limited 30,667.00 18,331.14 Signed 2019-10-21 2019-11-21 2019-12-16 2020-03-17 2020-06-13 Quotations Envelope of furniture for CERBM. operational management of the GPP PK-GPP BALOCHISTAN-59774- Improving public investment GO-RFB / Purchase of Data management and Single Stage - One TF / A3352 Post Request for Bids Open - National 608,250.00 0.00 Canceled 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2019-03-19 Center items for BPPRA under accountability in public Envelope Component III. services Improving public investment PK-GPP BALOCHISTAN- management and Request for Single Stage - One 150185-GO-RFQ / Purchase TF / A3352 Post Limited 60,000.00 0.00 Canceled 2019-12-24 2020-02-15 2020-08-13 accountability in public Quotations Envelope of IT equipment for CERBM. services Improving public investment PK-GPP BALOCHISTAN- management and Request for Single Stage - One 150183-GO-RFQ / Purchase TF / A3352 Post Limited 30,000.00 0.00 Canceled 2019-12-22 2020-02-16 2020-08-14 accountability in public Quotations Envelope of furniture for CERBM. services Page 1 PK-GPP BALOCHISTAN- Improving public investment 159116-GO-RFB / Purchase management and Single Stage - One TF / A3352 Post Request for Bids Open - National 126,000.00 226,668.71 Signed 2020-07-22 2020-08-24 2020-07-27 2020-08-27 2020-09-07 2020-11-18 2020-10-07 2020-12-11 2020-11-11 2021-01-06 2021-05-10 of IT equipment for Data accountability in public Envelope Server Room. services PK-GPP BALOCHISTAN- 215141-GO-RFQ / Purchase Improving public investment of IT hardware for Provincial Under management and Request for Single Stage - One Ombudsman and Anti TF / A3352 Post Limited 12,667.00 0.00 Implementati 2021-02-21 2021-03-11 2021-04-18 2021-10-15 accountability in public Quotations Envelope Corruption Balochistan under on services the newly approved concept note. PK-GPP BALOCHISTAN- Improving public investment 215144-GO-RFQ / Purchase Pending management and Request for Single Stage - One of Furniture for Provincial TF / A3352 Post Limited 6,667.00 0.00 Implementati 2021-03-01 2021-04-26 2021-10-23 accountability in public Quotations Envelope Ombudsman under the newly on services approved concept note. PK-GPP BALOCHISTAN- Improving public investment Pending 215148-GO-RFQ / Purchase management and Request for Single Stage - One TF / A3352 Post Limited 1,333.00 0.00 Implementati 2021-02-21 2021-04-18 2021-10-15 of AC for Anti Corruption accountability in public Quotations Envelope on under newly approved CN. services PK-GPP BALOCHISTAN- Improving public investment Pending 183696-GO-RFQ / Purchase management and Request for Single Stage - One TF / A3352 Post Limited 24,000.00 0.00 Implementati 2021-03-01 2021-04-26 2021-10-23 of electrical items for Data accountability in public Quotations Envelope on Server room. services Improving public investment PK-GPP BALOCHISTAN- management and Request for Single Stage - One 183697-GO-RFQ / Purchase TF / A3352 Post Limited 28,000.00 6,741.31 Signed 2021-02-22 2021-02-03 2021-04-19 2021-03-09 2021-10-16 accountability in public Quotations Envelope of office equipment. services PK-GPP BALOCHISTAN-39978- Improving public investment GO-RFQ / Purchase of misc. management and Request for Single Stage - One TF / A3352 Post Limited 96,154.00 0.00 Canceled 2018-01-22 2018-03-19 2018-09-15 IT equipment and server accountability in public Quotations Envelope room. services Improving public investment PK-GPP BALOCHISTAN-39981- Pending management and Request for Single Stage - One GO-RFQ / Purchase of TF / A3352 Post Limited 41,875.00 0.00 Implementati 2021-02-22 2021-04-19 2021-10-16 accountability in public Quotations Envelope furniture. on services PK-GPP BALOCHISTAN- 232718-GO-RFB / Purchase Improving public investment of communication, data Under management and Single Stage - One center, network equipment TF / A3352 Post Request for Bids Open - National 540,000.00 0.00 Implementati 2021-05-31 2021-05-31 2021-06-05 2021-06-01 2021-07-17 2021-07-27 2021-08-20 2022-02-16 accountability in public Envelope and related software for on services Information Cell of government of Balochistan. PK-GPP BALOCHISTAN- 165028-GO-RFQ / Purchase Improving public investment of communications equipment management and Request for Single Stage - One TF / A3352 Post Open - National 96,000.00 0.00 Canceled 2021-03-01 2021-04-26 2021-10-23 for the establishment of accountability in public Quotations Envelope Information Cell at DGPR services Balochistan. Improving public investment PK-GPP BALOCHISTAN- Pending management and Request for Single Stage - One 239581-GO-RFQ / Purchase TF / A3352 Post Limited 5,000.00 0.00 Implementati 2021-07-19 2021-09-13 2022-03-12 accountability in public Quotations Envelope of Furniture on services Improving public investment PK-GPP BALOCHISTAN- Pending management and Request for Single Stage - One 239582-GO-RFQ / Purchase TF / A3352 Post Open - National 33,000.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 accountability in public Quotations Envelope of office equipment on services Improving public investment PK-GPP BALOCHISTAN- Pending management and Request for Single Stage - One 239583-GO-RFQ / Purchase TF / A3352 Post Open - National 30,000.00 0.00 Implementati 2021-06-28 2021-08-23 2022-02-19 accountability in public Quotations Envelope of IT equipment on services NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Improving public investment PK-GPP BALOCHISTAN-39986- management and Request for Single Stage - One NC-RFQ / Cloud hosting for TF / A3352 Post Limited 14,423.00 0.00 Canceled 2017-12-25 2018-02-19 2018-08-18 accountability in public Quotations Envelope BPPRA. services Improving public investment PK-GPP BALOCHISTAN- management and Request for Single Stage - One 183695-NC-RFQ / Purchase TF / A3352 Post Open - National 47,000.00 21,476.69 Signed 2020-07-27 2020-09-21 2021-01-22 2021-03-20 accountability in public Quotations Envelope of software for Data Server. services CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Ensuring effective support for PK-GPP BALOCHISTAN-15665- the coordination of Consultant CS-CQS / Hiring of Internal TF / A3352 governance reforms and the Post Qualification Open - National 31,068.00 54,033.34 Signed 2017-05-22 2017-02-26 2017-05-29 2017-06-23 2017-04-21 2017-07-08 2017-06-13 2017-08-05 2017-06-29 2018-02-01 Audit Firm. operational management of Selection the GPP Improving public investment PK-GPP BALOCHISTAN-39992- Consultant management and CS-LCS / Hiring of TF / A3352 Prior Qualification Open - International 471,106.00 0.00 Canceled 2018-04-17 2018-07-24 2018-05-08 2018-06-21 2018-07-21 2018-08-25 2019-02-21 accountability in public International Firm for PIM. Selection services Page 2 PK-GPP BALOCHISTAN-69358- CS-QCBS / Hiring of firm for Improving public investment ICT System for the monitoring management and Quality And Cost- TF / A3352 Prior Open - International 269,231.00 477,492.93 Signed 2018-07-25 2018-07-19 2018-08-15 2018-07-31 2018-09-28 2019-01-31 2018-10-26 2019-03-29 2018-11-25 2021-02-10 2018-12-30 2021-02-10 2019-02-03 2019-07-18 2020-02-03 of the Public Sector accountability in public Based Selection Development Programme services (PSDP) PK-GPP BALOCHISTAN-71805- CS-QBS / Hiring of local Improving public investment academia for CERBM. Market management and Quality Based approach option in STEP is TF / A3352 Post Open - National 1,196,538.00 345,414.17 Signed 2018-07-27 2018-07-31 2018-08-17 2018-09-30 2019-01-25 2018-10-28 2019-03-29 2018-11-27 2019-03-29 2018-12-27 2019-06-26 2019-01-31 2019-09-02 2020-01-31 accountability in public Selection selected, however, the hiring services shall be limited to local academia only. Improving public investment PK-GPP BALOCHISTAN-71807- Consultant management and CS-CQS / Hiring of TF / A3352 Post Qualification Open - International 471,106.00 201,979.94 Signed 2018-07-27 2018-08-17 2018-08-17 2018-11-05 2018-09-30 2019-02-12 2018-10-30 2019-05-16 2018-12-04 2019-05-20 2019-06-02 accountability in public International Firm for PIM. Selection services Improving public investment PK-GPP BALOCHISTAN-39992- Consultant management and CS-LCS-2 / Hiring of TF / A3352 Post Qualification Open - International 471,106.00 0.00 Canceled 2019-03-22 2019-04-12 2019-05-26 2019-06-25 2019-07-30 2020-01-26 accountability in public International Firm for PIM. Selection services PK-GPP BALOCHISTAN-39989- Improving public investment CS-CQS / Software for P&DD's Consultant management and PSDP Automization and TF / A3352 Post Qualification Open - National 269,231.00 0.00 Canceled 2018-02-28 2018-05-04 2018-03-21 2018-05-04 2018-06-03 2018-07-08 2020-06-27 accountability in public Monitoring & Evaluation Selection services System PK-GPP BALOCHISTAN-39994- CS-QCBS / Hiring of local Improving public investment academia for CERBM. Market management and Quality Based approach option in STEP is TF / A3352 Prior Open - National 1,196,538.00 0.00 Canceled 2018-02-15 2018-03-08 2018-04-21 2018-05-19 2018-06-18 2018-07-18 2018-08-22 2019-08-22 accountability in public Selection selected, however, the hiring services shall be limited to local academia only. PK-GPP BALOCHISTAN- 215150-CS-CQS / Improving public investment Consultant Consultancy for upgrading management and Under TF / A3352 Post Qualification Open - National 8,000.00 0.00 2021-02-25 2021-05-05 2021-03-18 2021-05-31 2021-05-01 2021-05-31 2021-07-05 2022-01-01 cum revamping of Anti accountability in public Implementation Selection Corruption CMS under newly services approved CN. PK-GPP BALOCHISTAN- Improving public investment 114426-CS-QCBS / Hiring of management and Quality And Cost- consulting firm for TF / A3352 Post Open - International 269,231.00 0.00 Canceled 2019-05-10 2019-05-10 2019-05-10 2019-05-10 2019-05-10 2019-06-14 2019-07-19 2020-05-31 accountability in public Based Selection Automation of Balohcistan's services PSDP and M&E for the same. PK-GPP BALOCHISTAN- Improving public investment Consultant 111428-CS-CQS / management and TF / A3352 Post Qualification Open - National 144,231.00 0.00 Canceled 2019-05-16 2019-06-06 2019-07-20 2019-08-19 2019-09-23 2020-03-21 Development of LMS for accountability in public Selection BPPRA. services PK-GPP BALOCHISTAN- Improving public investment 224493-CS-QCBS / Hiring of management and Quality And Cost- Under firm for developing TF / A3352 Post Open - National 747,500.00 0.00 2021-03-16 2021-03-15 2021-04-06 2021-03-25 2021-04-30 2021-04-22 2021-05-30 2021-05-31 2021-06-21 2021-07-03 2022-06-30 accountability in public Based Selection Implementation Balochistan Spatial Decision services Support System. Improving public investment PK-GPP BALOCHISTAN- Consultant management and Pending 240946-CS-CQS / Hiring of TF / A3352 Post Qualification Open - National 47,333.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-09-10 2021-10-04 2022-04-02 accountability in public Implementation Firm for PPP Legal Advisory Selection services INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-GPP BALOCHISTAN- Ensuring effective support for 15A421-CS-INDV / Selection the coordination of Individual of Financial Management TF / A3352 governance reforms and the Prior Consultant Open 69,903.00 121,842.81 Signed 2017-05-22 2017-06-13 2017-06-20 2017-07-31 2017-07-16 2016-11-21 2018-01-12 Specialist Operational Support operational management of Selection Unit for Governance and the GPP Policy Project Balochistan. PK-GPP BALOCHISTAN-15431- Ensuring effective support for CS-INDV / Selection of the coordination of Individual Governance Specialist TF / A3352 governance reforms and the Post Consultant Open 69,903.00 20,587.68 Signed 2017-05-22 2017-06-13 2017-06-20 2017-05-04 2017-07-16 2017-05-04 2018-01-12 Governance Reform Support operational management of Selection Unit for Governance and the GPP Policy Project Balochistan. PK-GPP BALOCHISTAN-15428- Ensuring effective support for CS-INDV / Selection of Gender the coordination of Individual and Learning Specialist TF / A3352 governance reforms and the Post Consultant Open 52,427.00 31,984.78 Signed 2017-05-22 2016-06-07 2017-06-13 2018-02-28 2017-06-20 2017-04-03 2017-07-16 2017-04-03 2018-01-12 Operational Support Unit for operational management of Selection Governance and Policy Project the GPP Balochistan. PK-GPP BALOCHISTAN-15426- Ensuring effective support for CS-INDV / Selection of the coordination of Individual Strategic Communication TF / A3352 governance reforms and the Post Consultant Open 52,427.00 18,848.17 Signed 2017-05-22 2016-06-07 2017-06-13 2017-03-22 2017-06-20 2017-03-01 2017-07-16 2017-03-01 2018-01-12 Specialist Operational Support operational management of Selection Unit for Governance and the GPP Policy Project Balochistan. PK-GPP BALOCHISTAN-15424- Ensuring effective support for CS-INDV / Selection of the coordination of Individual Monitoring and Evaluation TF / A3352 governance reforms and the Post Consultant Open 61,165.00 25,359.36 Signed 2017-05-22 2016-06-07 2017-06-13 2017-03-14 2017-06-20 2017-03-16 2017-07-16 2017-03-16 2018-01-12 Specialist Operational Support operational management of Selection Unit for Governance and the GPP Policy Project Balochistan. Page 3 PK-GPP BALOCHISTAN-15422- Ensuring effective support for CS-INDV / Selection of the coordination of Individual Procurement Management TF / A3352 governance reforms and the Prior Consultant Open 69,903.00 22,774.73 Signed 2017-05-22 2017-06-13 2017-06-20 2017-07-31 2017-07-16 2017-02-20 2018-01-12 Specialist Operational Support operational management of Selection Unit for Governance and the GPP Policy Project Balochistan. PK-GPP BALOCHISTAN-15419- Ensuring effective support for CS-INDV / Selection of the coordination of Individual Coordinator Operational TF / A3352 governance reforms and the Post Consultant Open 78,641.00 51,404.11 Completed 2017-05-22 2017-06-13 2017-06-20 2017-04-14 2017-07-16 2017-04-14 2018-01-12 2020-06-30 Support Unit for Governance operational management of Selection and Policy Project Balochistan. the GPP PK-GPP BALOCHISTAN-15652- CS-INDV / Selection of Ensuring effective support for Citizens Engagement and the coordination of Individual Public Private Partnership TF / A3352 governance reforms and the Post Consultant Open 52,427.00 26,844.37 Signed 2017-05-22 2016-06-14 2017-06-13 2017-03-15 2017-06-20 2017-03-27 2017-07-16 2017-03-27 2018-01-12 Specialist Governance Reform operational management of Selection Support Unit for Governance the GPP and Policy Project Balochistan. PK-GPP BALOCHISTAN-15838- Ensuring effective support for CS-INDV / Selection of the coordination of Individual MIS/ICT Specialist Operational TF / A3352 governance reforms and the Post Consultant Open 52,427.00 26,273.21 Signed 2017-05-25 2016-06-07 2017-06-16 2017-06-30 2017-06-23 2017-07-03 2017-07-19 2017-07-03 2018-01-15 Support Unit for Governance operational management of Selection and Policy Project Balochistan. the GPP Ensuring effective support for PK-GPP BALOCHISTAN-21546- the coordination of Individual CS-INDV / Hiring of Contract TF / A3352 governance reforms and the Post Consultant Open 52,427.00 20,512.81 Signed 2017-07-28 2019-04-15 2017-09-15 2019-05-16 2017-10-06 2019-05-20 2017-11-10 2019-05-20 2018-05-09 Administration Specialist. operational management of Selection the GPP Improving public investment PK-GPP BALOCHISTAN-39988- Individual management and CS-INDV / Hiring of RBM TF / A3352 Post Consultant Open 69,231.00 10,765.55 Signed 2017-12-28 2019-08-28 2018-02-15 2019-11-04 2018-03-08 2019-11-07 2018-04-12 2019-11-07 2018-10-09 accountability in public coordinator for CERBM. Selection services Improving public investment PK-GPP BALOCHISTAN-38485- Individual management and CS-INDV / Hiring of Policy TF / A3352 Post Consultant Open 104,854.00 31,092.12 Signed 2017-11-30 2018-02-08 2018-01-03 2018-05-11 2018-01-13 2018-05-15 2018-02-17 2018-06-01 2020-02-07 accountability in public and Research Specialist. Selection services PK-GPP BALOCHISTAN-38475- Improving public investment Individual CS-INDV / Hiring of management and TF / A3352 Post Consultant Open 116,505.00 41,456.16 Signed 2017-11-30 2018-02-08 2018-01-03 2018-05-11 2018-01-13 2018-06-01 2018-02-17 2018-06-04 2020-02-07 Coordinator for CPEC Center accountability in public Selection under Component 3. services PK-GPP BALOCHISTAN-38488- Improving public investment Individual CS-INDV / Hiring of Financial management and TF / A3352 Post Consultant Open 108,854.00 34,848.85 Signed 2017-11-30 2018-02-08 2018-01-03 2018-05-15 2018-01-13 2019-02-18 2018-02-17 2019-02-18 2020-02-07 Adviser for CPEC center under accountability in public Selection Component 3. services PK-GPP BALOCHISTAN-38489- Improving public investment Individual CS-INDV / Hiring of Legal management and TF / A3352 Post Consultant Open 108,854.00 41,456.16 Signed 2017-11-30 2018-02-08 2018-01-03 2018-05-11 2018-01-13 2018-05-30 2018-02-17 2018-06-01 2020-02-07 Adviser for CPEC Center under accountability in public Selection Component 3. services PK-GPP BALOCHISTAN-79511- Improving public investment Individual CS-INDV / Hiring of Legal management and TF / A3352 Post Consultant Open 23,077.00 12,041.09 Signed 2018-10-17 2018-10-04 2018-12-05 2019-04-23 2018-12-26 2019-06-03 2019-01-30 2019-06-03 2020-01-25 Expert for Balochistan Anti accountability in public Selection Corruption. services PK-GPP BALOCHISTAN- Improving public investment Individual 153856-CS-INDV / Hiring of management and TF / A3352 Post Consultant Open 48,000.00 13,884.69 Signed 2020-01-21 2020-01-23 2020-02-24 2020-02-11 2020-03-05 2020-02-11 2020-04-09 2020-03-02 2021-04-09 Director for P&DD Reforms accountability in public Selection Cell. services Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Individual 153862-CS-INDV / Hiring of TF / A3352 governance reforms and the Post Consultant Open 36,000.00 9,366.03 Signed 2020-01-21 2020-01-28 2020-02-13 2020-03-30 2020-02-20 2020-03-31 2020-03-17 2020-04-01 2021-03-12 Development Specialist for operational management of Selection P&DD Reform Cell. the GPP Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Individual 153865-CS-INDV / Hiring of TF / A3352 governance reforms and the Post Consultant Open 36,000.00 9,668.26 Signed 2020-01-21 2020-01-28 2020-02-12 2020-03-16 2020-02-19 2020-03-16 2020-03-16 2020-03-18 2021-03-11 E Governance Specialist for operational management of Selection P&DD Reform Cell. the GPP Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Individual 153866-CS-INDV / Hiring of TF / A3352 governance reforms and the Post Consultant Open 36,000.00 9,578.63 Signed 2020-01-21 2020-01-28 2020-02-12 2020-03-16 2020-02-19 2020-03-18 2020-03-16 2020-03-18 2021-03-11 Data Analyst Specialist for operational management of Selection P&DD Reform Cell. the GPP PK-GPP BALOCHISTAN- Improving public investment Individual 154128-CS-INDV / Hiring of management and TF / A3352 Post Consultant Open 20,000.00 5,064.44 Signed 2020-01-22 2020-01-28 2020-03-11 2020-03-18 2020-04-01 2020-03-18 2020-05-06 2020-03-20 2020-11-02 Program Manager for P&D accountability in public Selection Reform Cell. services Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Individual 165033-CS-INDV / Hiring of Under TF / A3352 governance reforms and the Post Consultant Open 12,000.00 0.00 2020-03-24 2020-08-21 2020-05-12 2020-06-02 2020-07-07 2021-01-03 IT Expert for DGPR Implementation operational management of Selection Balochistan's Information Cell. the GPP Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Individual 184364-CS-INDV / Hiring of TF / A3352 governance reforms and the Post Consultant Open 77,000.00 61,069.85 Signed 2020-07-15 2020-07-15 2020-09-02 2020-09-05 2020-09-23 2020-12-01 2020-10-28 2020-12-01 2022-06-30 Coordinator for GPP operational management of Selection Balochistan. the GPP Improving public investment PK-GPP BALOCHISTAN- Individual management and 188465-CS-INDV / Hiring of TF / A3352 Post Consultant Open 6,452.00 6,228.59 Signed 2020-08-18 2020-08-20 2020-10-06 2020-12-04 2020-10-27 2020-12-07 2020-12-01 2020-12-07 2021-05-30 accountability in public Information Security Analyst. Selection services Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Individual 208571-CS-INDV / Hiring of Under TF / A3352 governance reforms and the Post Consultant Open 50,000.00 0.00 2020-12-10 2020-12-21 2021-01-28 2021-03-05 2021-02-18 2021-03-25 2021-09-21 MIS/ICT Individual consultant Implementation operational management of Selection for OSU. the GPP Page 4 Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Individual 208573-CS-INDV / Hiring of TF / A3352 governance reforms and the Post Consultant Open 50,000.00 26,614.49 Signed 2020-12-09 2020-12-21 2020-12-31 2021-03-05 2021-01-07 2021-03-09 2021-02-02 2021-03-09 2021-08-01 M&E Specialist individual operational management of Selection consultant for OSU. the GPP PK-GPP BALOCHISTAN- 215149-CS-INDV / Hiring of Improving public investment Individual Legal Expert for Provincial management and Under TF / A3352 Post Consultant Open 4,000.00 0.00 2021-02-24 2021-02-26 2021-04-14 2021-05-05 2021-06-09 2021-12-06 Ombudsman for reforming of accountability in public Implementation Selection laws under newly approved services CN. PK-GPP BALOCHISTAN- Improving public investment 103211-CS-INDV / Hiring of Individual management and Investment Promotion TF / A3352 Post Consultant Open 23,077.00 0.00 Canceled 2019-03-07 2019-03-14 2019-04-25 2019-05-16 2019-06-20 2019-12-17 accountability in public Specialist under PIM Selection services (Component 3). Ensuring effective support for PK-GPP BALOCHISTAN- the coordination of Individual 189802-CS-INDV / Hiring of Pending TF / A3352 governance reforms and the Post Consultant Open 12,000.00 0.00 2021-03-31 2021-05-19 2021-06-09 2021-07-14 2022-01-10 IT Expert for DGPR Implementation operational management of Selection Information Cell. the GPP Improving public investment PK-GPP BALOCHISTAN- Individual management and Pending 239584-CS-INDV / Hiring of TF / A3352 Post Consultant Open 8,000.00 0.00 2021-06-30 2021-07-30 2021-08-06 2021-08-25 2022-02-21 accountability in public Implementation Legal Advisor Selection services Improving public investment PK-GPP BALOCHISTAN- Individual management and Pending 240945-CS-INDV / Hiring of TF / A3352 Post Consultant Open 8,000.00 0.00 2021-06-30 2021-07-30 2021-08-06 2021-08-25 2022-02-21 accountability in public Implementation Legal Advisor Selection services Page 5 PROCUREMENT PLAN (Textual Part) Project information: Nigeria [SPESSE ][P169405] Project Implementation agency: National University Commission Date of the Procurement Plan: August 9, 2019 Period covered by this Procurement Plan: [August 9, 2019 – Jan 31, 2019] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Nigeria 2017 Procurement Act, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. None When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Goods: is not applicable Works: is not applicable Other Relevant Procurement Information. None PROCUREMENT Nigeria : Sustainable Procurement, Environmental and Social Standards Enhancement Project (SPESSE) PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2019-08-22 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169405 GPN Date: Project Name: Sustainable Procurement, Environmental and Social Standards Enhancement Project (SPESSE) Loan / Credit No: / , IDA / V2820, IDA / 65250 National Universities Commission Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component II: Establishment NG-NUC-128742-GO-RFB / Single Stage - One / and operating the Centers of Post Request for Bids Open - National 1,100,000.00 0.00 Canceled 2019-09-12 2019-09-17 2019-10-29 2019-11-28 2020-01-02 2020-06-30 Enterprise LMS Envelope Excellence (SPESSCE) NG-NUC-128743-GO-RFB / Component II: Establishment Single Stage - One Central Server and Storage for / and operating the Centers of Post Request for Bids Open - National 600,000.00 0.00 Canceled 2019-09-12 2019-09-17 2019-10-29 2019-11-28 2020-01-02 2020-06-30 Envelope LMS Excellence (SPESSCE) Component II: Establishment NG-NUC-121519-GO-RFQ / Single Stage - One / and operating the Centers of Post Request for Bids Open - National 680,000.00 0.00 Canceled 2019-09-15 2019-09-20 2019-11-01 2019-12-01 2020-01-05 2020-07-03 Internet Connectivity (1 GB) Envelope Excellence (SPESSCE) NG-NUC-128745-GO-RFB / Component II: Establishment Single Stage - One Lecture Theater / and operating the Centers of Post Request for Bids Open - National 400,000.00 0.00 Canceled 2019-09-16 2019-09-21 2019-11-02 2019-12-02 2020-01-06 2020-07-04 Envelope Communication Infrastructure Excellence (SPESSCE) NG-NUC-127220-GO-RFP / Component I: Technical Pending Procuremet of IT Equipment Request for Single Stage - One IDA / V2820 assistance and Support to Post Limited 30,000.00 0.00 Implementati 2020-05-11 2020-07-06 2021-01-02 for Project and Respective Quotations Envelope implementing agencies on Desks NG-NUC-181997-GO-RFQ / Component I: Technical Pending Request for Single Stage - One Procurement of Office tools IDA / V2820 assistance and Support to Post Limited 101,586.00 0.00 Implementati 2020-09-29 2020-11-24 2021-05-23 Quotations Envelope Equipment implementing agencies on NG-NUC-181985-GO-DIR / Component I: Technical Under Procurement of Learning IDA / V2820 assistance and Support to Post Direct Selection Direct 346,175.00 0.00 Implementati 2020-08-07 2021-06-22 2020-08-12 2020-09-16 2021-03-15 Application Software implementing agencies on NG-NUC-181990-GO-DIR / Component I: Technical Under Procurement of Learning IDA / V2820 assistance and Support to Post Direct Selection Direct 385,900.00 0.00 Implementati 2020-08-10 2021-06-22 2020-08-15 2020-09-19 2021-03-18 Management System implementing agencies on NG-NUC-181918-GO-RFB / Component I: Technical Pending Procurement of Electronic Single Stage - One IDA / V2820 assistance and Support to Post Request for Bids Open - National 285,000.00 0.00 Implementati 2020-09-16 2020-09-21 2020-11-02 2020-12-02 2021-01-06 2021-07-05 Document Management Envelope implementing agencies on System Softwares NG-NUC-187505-GO-RFQ / Component I: Technical Pending Request for Single Stage - One Procurement of HRM Service IDA / V2820 assistance and Support to Post Limited 4,900.00 0.00 Implementati 2020-09-02 2020-10-28 2021-04-26 Quotations Envelope Software implementing agencies on NG-NUC-187503-GO-RFQ / Component I: Technical Pending Procurement of E- Request for Single Stage - One IDA / V2820 assistance and Support to Post Limited 5,900.00 0.00 Implementati 2020-09-02 2020-10-28 2021-04-26 Procurement Portal service Quotations Envelope implementing agencies on Software NG-NUC-198809-GO-RFQ / Component II: Establishment Procurement of Anti- Request for Single Stage - One IDA / V2820 and operating the Centers of Post Limited 215,000.00 216,531.66 Completed 2020-10-27 2020-11-02 2020-12-22 2020-12-03 2021-06-20 2020-12-11 Plagiarism Software for Quotations Envelope Excellence (SPESSCE) Centres of Excellence NG-NUC-203384-GO-RFB / Procurement of learning Component II: Establishment Single Stage - One Management System Devices IDA / 65250 and operating the Centers of Post Request for Bids Open - National 651,000.00 0.00 Canceled 2020-11-19 2020-11-20 2020-11-24 2020-12-01 2021-01-05 2021-02-04 2021-03-11 2021-09-07 Envelope for SPESSE Centres of Excellence (SPESSCE) Excellence NG-NUC-203387-GO-RFB / Procurement of Network Component II: Establishment Single Stage - One Devices & Outdoor WiFi IDA / 65250 and operating the Centers of Post Request for Bids Open - National 230,000.00 0.00 Canceled 2020-11-19 2020-11-20 2020-11-24 2020-12-01 2021-01-05 2020-12-18 2021-02-04 2021-03-11 2021-09-07 Envelope equipment for SPESSE Centres Excellence (SPESSCE) of Excellence NG-NUC-214086-GO-DIR / Component II: Establishment Internet Subscription and IDA / V2820 and operating the Centers of Post Direct Selection Direct 1,380,236.31 1,288,219.30 Signed 2021-01-20 2021-01-15 2021-01-25 2021-02-17 2021-03-01 2021-03-04 2021-08-28 associated facilities for SPESSE Excellence (SPESSCE) Centres of Excellence NG-NUC-236324-GO-RFB / Procurement of learning Component II: Establishment Under Single Stage - One Management System Devices IDA / 65250 and operating the Centers of Post Request for Bids Open - National 651,000.00 0.00 Implementati 2021-06-10 2021-06-10 2021-06-15 2021-06-22 2021-07-27 2021-08-26 2021-09-30 2022-03-29 Envelope for SPESSE Centres of Excellence (SPESSCE) on Excellence NG-NUC-236331-GO-RFB / Procurement of Network Component II: Establishment Under Single Stage - One Devices & Outdoor Wi-Fi IDA / 65250 and operating the Centers of Post Request for Bids Open - National 930,000.00 0.00 Implementati 2021-06-10 2021-06-21 2021-06-15 2021-06-24 2021-07-27 2021-08-26 2021-09-30 2022-03-29 Envelope equipment for SPESSE Centres Excellence (SPESSCE) on of Excellence NON CONSULTING SERVICES Page 1 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-NUC-168386-NC-DIR / Component I: Technical Design & Installation of IDA / V2820 assistance and Support to Post Direct Selection Direct 117,000.00 129,810.86 Completed 2020-04-30 2020-05-25 2020-05-05 2020-05-25 2020-06-09 2020-07-08 2020-12-06 2020-09-08 Flexible Accounting Software implementing agencies for SPESSE NG-NUC-181980-NC-RFB / Component I: Technical Pending Procurement of Single Stage - One IDA / V2820 assistance and Support to Post Request for Bids Limited 1,983,116.00 0.00 Implementati 2020-07-24 2020-07-29 2020-09-09 2020-10-09 2020-11-13 2021-05-12 Hyperconverged infrastructure Envelope implementing agencies on for HPC Component I: Technical Pending NG-NUC-182003-NC-DIR / IDA / V2820 assistance and Support to Post Direct Selection Direct 111,609.00 0.00 Implementati 2020-08-04 2020-08-09 2020-09-13 2021-03-12 NgREN Subscription (lastmile) implementing agencies on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NUC-SPESSE/C/CQS/04/19 / Consultancy Services for the Component I: Technical Consultant Preparation of Project IDA / V2820 assistance and Support to Post Qualification Limited 78,000.00 60,891.94 Completed 2019-10-06 2020-03-23 2019-10-20 2020-05-25 2019-11-19 2020-07-07 2019-12-24 2020-07-08 2020-06-21 2020-11-10 Implementation Manual (PIM) implementing agencies Selection for SPESSE Project NUC-SPESSE/C/CQS/02/20 / Component I: Technical Consultant Consultancy Service for the Under IDA / V2820 assistance and Support to Post Qualification Limited 30,000.00 0.00 2020-03-17 2020-03-25 2020-03-31 2020-04-30 2020-06-04 2020-12-01 Production of Documentary on Implementation implementing agencies Selection (SPESSE) Project NG-NUC-127213-CS-CQS / Component II: Establishment Consultant Consultancy Services on / and operating the Centers of Post Qualification Limited 310,000.00 0.00 Canceled 2019-08-14 2019-04-15 2019-08-28 2019-09-27 2019-11-01 2020-04-29 Needs Assessment Excellence (SPESSCE) Selection NG-NUC-121510-CS-CQS / Component II: Establishment Consultant Consultancy Services on / and operating the Centers of Post Qualification Limited 295,000.00 0.00 Canceled 2019-07-10 2019-04-10 2019-07-10 2019-08-01 2019-08-06 2020-02-02 Demand Assessment Excellence (SPESSCE) Selection NG-NUC-236335-CS-QCBS / Component I: Technical Quality And Cost- Under Engagement of Independent IDA / 65250 assistance and Support to Post Open - International 500,000.00 0.00 2021-06-15 2021-06-09 2021-07-06 2021-06-24 2021-08-19 2021-09-16 2021-10-16 2021-11-20 2021-12-25 2022-12-25 Based Selection Implementation Verification Agent implementing agencies INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component I: Technical Individual NG-NUC-121512-CS-INDV / Pending / assistance and Support to Post Consultant Open 30,296.00 0.00 2019-10-14 2019-12-02 2019-12-23 2020-01-27 2020-07-25 ICT Consultant on LMS Implementation implementing agencies Selection NG-NUC-121514-CS- INDV/02/19 / Consultancy Component I: Technical Individual Under Services for the engagement / assistance and Support to Post Consultant Open 38,950.00 0.00 2019-08-28 2019-09-01 2019-10-16 2019-11-06 2019-12-11 2020-06-08 Implementation of Lead Higher Education implementing agencies Selection Specialist for SPESSE Project NG-NUC-121514-CS- INDV/05/19 / Consultancy Component I: Technical Individual Services for the engagement / assistance and Support to Post Consultant Open 38,950.00 99,990.00 Signed 2019-09-04 2019-09-01 2019-10-23 2020-02-07 2019-11-13 2020-03-19 2019-12-18 2020-03-23 2020-06-15 of Lead ICT Specialist for implementing agencies Selection SPESSE Project NG-NUC-128749-CS-INDV / Consultancy Services for the Component II: Establishment Individual Under Engagement of Centres of / and operating the Centers of Post Consultant Open 38,950.00 0.00 2019-09-04 2019-09-03 2019-10-23 2019-11-13 2019-12-18 2020-06-15 Implementation Excellence Monitoring Excellence (SPESSCE) Selection Specialist for SPESSE Project NG-NUC-127246-CS-INDV / Component I: Technical Individual Engagement of a Senior Under / assistance and Support to Post Consultant Open 25,967.00 0.00 2019-11-05 2019-11-28 2019-12-24 2020-01-14 2020-02-18 2020-08-16 Education Specialist ( Social Implementation implementing agencies Selection Standard) for SPESSE Project NG-NUC-127238-CS-INDV / Component I: Technical Individual Consultancy Services for the / assistance and Support to Prior Consultant Direct 62,755.00 613,173.38 Signed 2019-08-14 2019-06-21 2019-08-24 2019-06-21 2019-09-14 2019-06-21 2019-10-19 2019-06-21 2020-04-16 Engagement of Project implementing agencies Selection Coordinator for SPESSE Project NG-NUC-127250-CS-INDV / Component I: Technical Individual Under Engagement of a Content / assistance and Support to Post Consultant Open 25,967.00 0.00 2019-11-11 2019-11-28 2019-12-30 2020-01-20 2020-02-24 2020-08-22 Implementation Specialist for SPESSE Project implementing agencies Selection NG-NUC-127248-CS-INDV / Component I: Technical Individual Engagement of an Education Under / assistance and Support to Post Consultant Open 25,967.00 0.00 2019-11-05 2019-11-28 2019-12-24 2020-01-14 2020-02-18 2020-08-16 Specialist for Environmental Implementation implementing agencies Selection Standards for SPESSE NG-NUC-127252-CS-INDV / Component I: Technical Individual Engagement of a Computer Under / assistance and Support to Post Consultant Open 25,967.00 0.00 2019-11-11 2019-11-28 2019-12-30 2020-01-20 2020-02-24 2020-08-22 and Communication Egineer Implementation implementing agencies Selection for SPESSE Project NG-NUC-127247-CS-INDV / Engagement of a Senior Component I: Technical Individual Under Education Specialist / assistance and Support to Post Consultant Open 25,967.00 0.00 2019-11-05 2019-11-28 2019-12-24 2020-01-14 2020-02-18 2020-08-16 Implementation (Procurement) for SPESSE implementing agencies Selection Project Page 2 NG-NUC-127239-CS-INDV / Consultancy Services for the Component I: Technical Individual Engagement of Senior IDA / V2820 assistance and Support to Post Consultant Direct 41,115.00 88,852.10 Signed 2019-08-14 2019-06-20 2019-08-24 2019-06-28 2019-09-14 2019-07-26 2019-10-19 2019-07-23 2020-04-16 Procurement Specialist for implementing agencies Selection SPESSE Project NG-NUC-168389-CS-CDS / Consultancy Services for the Component I: Technical Engagement of Project IDA / V2820 assistance and Support to Prior Direct Selection Direct 74,000.00 0.00 Canceled 2020-04-28 2020-05-21 2020-05-08 2020-07-12 2021-01-08 Implementation Support implementing agencies Consultant I NG-NUC-168390-CS-CDS / Consultancy Services for the Component I: Technical Under Engagement of Project IDA / V2820 assistance and Support to Post Direct Selection Direct 45,000.00 0.00 2020-04-29 2020-05-18 2020-05-09 2020-07-13 2021-01-09 Implementation Implementation Support implementing agencies Consultant II NG-NUC-121514-CS- INDV/03/19 / Consultancy Component II: Establishment Individual Pending Services for the Selection of IDA / V2820 and operating the Centers of Post Consultant Direct 100,000.00 0.00 2019-08-14 2019-08-24 2019-09-14 2019-10-19 2020-04-16 Implementation Centers of Excellence for Excellence (SPESSCE) Selection SPESSE Project NG-NUC-181227-CS-CDS / Consultancy Services for the Component I: Technical Engagement of Project IDA / V2820 assistance and Support to Post Direct Selection Direct 74,000.00 59,221.70 Signed 2020-06-23 2020-06-25 2020-07-03 2020-05-25 2020-09-06 2020-06-02 2021-03-05 Implementation Support implementing agencies Consultant I NG-NUC-127249-CS-INDV / Component I: Technical Individual Engagement of a Student / assistance and Support to Post Consultant Open 25,967.00 0.00 Canceled 2019-11-11 2019-11-28 2019-12-30 2020-01-20 2020-02-24 2020-08-22 Information System Specialist implementing agencies Selection for SPESSE Project NG-NUC-121514-CS- INDV/04/19 / Consultancy Component I: Technical Individual Services for the engagement / assistance and Support to Prior Consultant Open 30,300.00 0.00 Canceled 2019-08-23 2019-09-20 2019-10-11 2019-11-01 2019-12-06 2020-06-03 of Procurement Officer for implementing agencies Selection SPESSE Project NG-NUC-127241-CS-INDV / Component I: Technical Individual Engagement of Project / assistance and Support to Post Consultant Direct 30,295.00 0.00 Canceled 2019-08-23 2019-09-03 2019-09-02 2019-09-23 2019-10-28 2020-04-25 Accountant implementing agencies Selection NG-NUC-121514-CS- INDV/01/19 / Consultancy Component I: Technical Individual Services for the engagement / assistance and Support to Post Consultant Open 34,630.00 0.00 Canceled 2019-08-28 2019-09-01 2019-10-16 2019-11-06 2019-12-11 2020-06-08 of Communication Officer for implementing agencies Selection SPESSE Project NG-NUC-127242-CS-INDV / Component I: Technical Individual Engagement of Finance / assistance and Support to Post Consultant Limited 17,312.00 0.00 Canceled 2019-08-25 2019-08-30 2019-09-20 2019-10-25 2020-04-22 Officer implementing agencies Selection NG-NUC-187504-CS-CDS / Consultancy Services for the review and Development of training Modules in Component I: Technical Procurement at Entry and IDA / V2820 assistance and Support to Prior Direct Selection Direct 251,000.00 250,155.00 Signed 2020-08-20 2020-08-06 2020-08-30 2020-08-08 2020-11-03 2020-08-15 2021-05-02 Practitioners’ levels and implementing agencies Review of Curriculum Design related to the Academic Degrees’ levels in Nigeria Component II: Establishment Individual NG-NUC-127218-CS-INDV / IDA / V2820 and operating the Centers of Post Consultant Direct 100,000.00 0.00 Canceled 2019-08-19 2019-08-29 2019-09-19 2019-10-24 2020-04-21 Curriculum Development Excellence (SPESSCE) Selection Page 3 PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, Strengthen Ethiopia’s Adaptive Safety Net Project. Project Implementation agency: Ministry of Agriculture, Food Security Coordination Directorate Date of the Procurement Plan: March 11, 2021 Period covered by this Procurement Plan: March to June 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Ethiopian Federal Government, Procurement and Procurement Administration Proclamation No. 649/2009, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. For national open competitive procurement, the following requirements apply: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. the Procurement Documents include sufficient provisions, as agreed with the Bank, to adequately mitigate against environmental and social (including SEA/SH), risks and impacts; e. contracts with an appropriate allocation of responsibilities, risks, and liabilities; f. publication of contract award information; g. rights for the Bank to review procurement documentation and activities; h. an effective complaints mechanism; and i. maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Ethiopia : Strengthen Ethiopia’s Adaptive Safety Net PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2021-05-26 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172479 GPN Date: Project Name: Strengthen Ethiopia’s Adaptive Safety Net Loan / Credit No: IDA / 67980 Oromiya Food Security Coordination Directorate Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Systems, Capacity Pending ET-OROMIYA FSCD-230892- Request for Single Stage - One IDA / 67980 Development, and Program Post Limited 20,730.00 0.00 Implementati 2021-06-03 2021-07-05 2021-07-30 GO-RFQ / Procurement of GPS Quotations Envelope Management Support on ET-OROMIYA FSCD-231067- Systems, Capacity Pending Request for Single Stage - One GO-RFB / Procurement of IDA / 67980 Development, and Program Post Limited 90,000.00 0.00 Implementati 2021-06-01 2021-06-30 2021-10-28 Quotations Envelope office Equipment (Electronics) Management Support on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PROCUREMENT PLAN (Textual Part) Mozambique - P161777 - Mozambique Urban Sanitation and Drainage Project Project Implementation agency: Direcção Nacional de Abastecimento de Agua e Saneamento Date of the Procurement Plan: October 18, 2017 Period covered by this Procurement Plan: October 2017 – June 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Decree 5/2016, Regulamento de Contratacao de Empreitada de Obras Publicas, Fornecimento de Bens e Prestacao de Servicos ao Estado) published in the Recipient’s Official Gazette (Boletim da Republica), of March 8, 2016, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Mozambique : Mozambique Urban Sanitation Project PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2019-05-23 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161777 GPN Date: 2018-04-20 Project Name: Mozambique Urban Sanitation Project Loan / Credit No: IDA / D4750 W Executing Agency(ies): ater and Sanitation Infrastructure Administration WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MZ-AIAS-114784-CW-RFP / Priority Sewerage Investments Pending Single Stage - One 2021-02- Maputo Sewerage Network IDA / D4750 in Maputo, Quelimane and Post Request for Bids Open - National 2,500,000.00 0.00 Implementat 2020-05-04 2020-05-09 2020-06-20 2020-07-20 2020-08-24 Envelope 20 Improvements and Upgrading Tete ion MZ-AIAS-114814-CW-RFP / Priority Sewerage Investments Infulene Wastewater Single Stage - One 15,000,000.0 12,806,079. 2020-03- IDA / D4750 in Maputo, Quelimane and Prior Request for Bids Open - International Signed 2019-06-13 2020-08-20 2019-06-18 2020-08-24 2019-07-30 2020-11-24 2019-08-29 2021-02-17 2019-10-03 2021-04-12 Treatment Plant Detailed Envelope 0 25 31 Tete Design and Construction GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-AIAS-196533-GO-RFQ / Priority Sewerage Investments Information technology Request for Single Stage - One IDA / D4750 in Maputo, Quelimane and Post Limited 52,000.00 26,674.28 Signed 2020-10-03 2020-04-13 2020-11-28 2020-06-10 2021-05-27 equipment including Quotations Envelope Tete computers and UPS MZ-AIAS-172344-GO-RFQ / Priority Sewerage Investments COMPUTERS, INFORMATION Request for IDA / D4750 in Maputo, Quelimane and Post 52,000.00 0.00 Canceled 2020-05-08 2020-05-08 2020-05-08 EQUIPMENT AND SUPPLIES Quotations Tete FOR AIAS Priority Sewerage Investments Pending MZ-AIAS-219623-GO-RFQ / Request for IDA / D4750 in Maputo, Quelimane and Post 53,500.00 0.00 Implementati 2021-03-03 2021-04-28 2021-10-25 Supply of vehicles for AIAS Quotations Tete on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-AIAS-116220-CS-QCBS / Detailed Design and Priority Sewerage Investments Quality And Cost- Supervision of Priority IDA / D4750 in Maputo, Quelimane and Prior Open - International 1,000,000.00 1,389,238.75 Signed 2019-05-27 2019-10-10 2019-06-17 2019-10-17 2019-07-31 2020-03-25 2019-08-28 2020-06-02 2019-09-27 2020-08-18 2019-11-01 2020-12-21 2019-12-06 2021-02-05 2020-12-05 Based Selection Sewerage Investment for Tete Maputo MZ-AIAS-116233-CS-QCBS / Feasibility assessment, Priority Sewerage Investments detailed design, tender Quality And Cost- IDA / D4750 in Maputo, Quelimane and Prior Open - International 1,300,000.00 1,582,375.00 Signed 2019-07-01 2019-09-20 2019-07-22 2019-10-17 2019-09-04 2020-03-26 2019-10-02 2020-05-18 2019-11-01 2020-10-16 2019-12-06 2021-02-12 2020-01-10 2021-03-08 2021-01-09 documents and supervision of Based Selection Tete priority sewerage investments for Quelimane MZ-AIAS-145836-CS-QCBS / CONSULTANCY SERVICE FOR Priority Sewerage Investments Quality And Cost- WORK SUPERVISION OF IDA / D4750 in Maputo, Quelimane and Prior Open - International 700,000.00 598,720.00 Signed 2019-11-15 2020-01-06 2019-12-06 2020-01-22 2020-01-19 2020-06-18 2020-02-16 2020-08-18 2020-03-17 2020-11-16 2020-04-21 2021-02-17 2020-05-26 2021-03-08 2021-05-26 Based Selection INFULENE WASTEWATER Tete TREATMENT PLANT - MAPUTO MZ-AIAS-171603-CS-QCBS / CONSULTANCY SERVICES FOR Priority Sewerage Investments ELABORATION OF Quality And Cost- Under IDA / D4750 in Maputo, Quelimane and Post Open - International 200,000.00 0.00 2020-05-06 2020-05-06 2020-05-27 2020-07-10 2020-08-07 2020-09-06 2020-10-11 2020-11-15 2021-11-15 RESETTLEMENT ACTION PLAN Based Selection Implementation Tete (RAP) FOR MAPUTO SEWERAGE SYSTEM MZ-AIAS-171616-CS-QCBS / CONSULTANCY SERVICES FOR PREPARATION OF THE Priority Sewerage Investments Quality And Cost- ENVIRONMENTAL AND SOCIAL IDA / D4750 in Maputo, Quelimane and Post Open - International 170,000.00 0.00 Canceled 2020-05-06 2020-05-06 2020-05-27 2020-10-26 2020-07-10 2020-08-07 2020-09-06 2020-10-11 2020-11-15 2021-11-15 Based Selection IMPACT ASSESSMENT (ESIA) Tete FOR MAPUTO SEWERAGE SYSTEM MZ-AIAS-171622-CS-QCBS / CONSULTANCY SERVICES FOR ELABORATION OF Priority Sewerage Investments Quality And Cost- Under RESETTLEMENT ACTION PLAN IDA / D4750 in Maputo, Quelimane and Post Open - International 350,000.00 0.00 2020-05-06 2020-05-06 2020-05-27 2020-07-10 2020-08-07 2020-09-06 2020-10-11 2020-11-15 2021-11-15 Based Selection Implementation (RAP) FOR PRIORITY Tete SEWERAGE WORKS IN QUELIMANE AND TETE Page 1 MZ-AIAS-171624-CS-QCBS / CONSULTANCY SERVICES FOR PREPARATION OF THE Priority Sewerage Investments ENVIRONMENTAL AND SOCIAL Quality And Cost- Under IDA / D4750 in Maputo, Quelimane and Post Open - International 270,000.00 0.00 2020-05-06 2020-05-06 2020-05-24 2021-03-22 2020-07-07 2020-08-04 2020-09-03 2020-10-08 2020-11-12 2021-11-12 IMPACT ASSESSMENT (ESIA) Based Selection Implementation Tete FOR PRIORITY SEWERAGE WORKS IN QUELIMANE AND TETE MZ-AIAS-116236-CS-QCBS / Feasibility assessment, Priority Sewerage Investments detailed design, tender Quality And Cost- IDA / D4750 in Maputo, Quelimane and Prior Open - International 1,200,000.00 0.00 Canceled 2019-07-01 2019-07-22 2019-09-04 2019-10-02 2019-11-01 2019-12-06 2020-01-10 2021-01-09 documents and supervision of Based Selection Tete priority sewerage investments for Tete MZ-AIAS-171616-CS-CQS / Preparation of the Priority Sewerage Investments Consultant Under Environmental and Social IDA / D4750 in Maputo, Quelimane and Post Qualification Limited 170,000.00 0.00 2021-06-04 2021-06-07 2021-06-18 2021-07-30 2021-08-27 2022-08-27 Implementation Impact Assessment (ESIA) for Tete Selection Maputo Sewerage System INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-AIAS-172341-CS-INDV / Priority Sewerage Investments Individual TRANSLATION SERVICES FOR IDA / D4750 in Maputo, Quelimane and Post Consultant Open 30,000.00 0.00 Canceled 2020-05-12 2020-06-30 2020-07-21 2020-08-25 2021-02-21 AIAS Tete Selection Priority Sewerage Investments Individual MZ-AIAS-196519-CS-INDV / IDA / D4750 in Maputo, Quelimane and Post Consultant Limited 70,000.00 60,081.01 Signed 2020-10-09 2020-09-29 2020-10-24 2020-10-19 2020-11-14 2021-03-05 2020-12-19 2021-04-06 2022-12-19 Translation Services to AIAS Tete Selection MZ-AIAS-219620-CS-CDS / Services for Analysis of Feacal Priority Sewerage Investments Sludge and Effluents to To IDA / D4750 in Maputo, Quelimane and Post Direct Selection Direct 73,320.00 98,991.90 Signed 2021-03-05 2021-03-05 2021-03-15 2021-03-10 2021-05-19 2021-04-06 2021-11-15 Infulene Wastewater Tete Treatment Plant MZ-AIAS-226995-CS-INDV / Individual Water and Sanitation Specialist Technical Assistance and IDA / D4750 Post Consultant Direct 80,000.00 81,200.00 Signed 2021-03-30 2021-03-29 2021-04-07 2021-04-05 2021-04-21 2021-04-16 2021-05-26 2021-04-20 2021-11-22 for Project Development Project Management Support Selection Support MZ-AIAS-232943-CS-INDV / Individual Technical Assistance and Under Environmental Safeguards IDA / D4750 Post Consultant Open 130,000.00 0.00 2021-05-14 2021-05-04 2021-07-02 2021-07-23 2021-08-27 2022-02-23 Project Management Support Implementation Specialist Selection Page 2 Plan de Passation de marchés – Partie texturale I. Généralités 1. L'information sur le projet : Djibouti – Electricité de Djibouti - Projet d’Electrification durable – P158505 2. Date d’approbation du Plan de passation de marchés par la Banque : Révision Avril 2018 3. Date de notification du Plan Général de Passation de marchés : Avril 2018 4. Période couverte par le Plan de Passation de marchés : 2018- 2019 II. Biens et Travaux et Services autres que consultants 1. Seuil de Revue préalable : Applicables pour Djibouti pour risque substantiel 2. Pré-qualification : Pas prévu par ce plan. 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 3.17 des Directives : Non applicable 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Le manuel a détaillé les arrangements institutionnels et le processus de passation des marchés prévus 5. Tout autre arrangement spécial en passation de marchés : Le projet a prévu une passation de marchés anticipée et financement rétroactif. III. Sélection de consultants 1. Seuil de Revue Préalable : Applicables pour Djibouti pour risque substantiel 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de $300,000 par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 2.7 des directives de sélection de consultants. 3. Tout autre arrangement spécial de Sélection de consultants : Pas de financement rétroactif pour les services de consultants IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier Les activités de renforcement de capacité seront renseignées dans le plan de travail et budget annuel. Elles pourront être énumérées avec le détail suivant No. Résultats Coût Durée Date de Commentaires escomptés / estimatif estimative début Description de l’activité PROCUREMENT Djibouti : Djibouti: Sustainable Electrification Program PLAN General Information Country: Djibouti Bank’s Approval Date of the Original Procurement Plan: 2018-04-04 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158505 GPN Date: 2018-02-21 Project Name: Djibouti: Sustainable Electrification Program Loan / Credit No: IDA / 60690 E Executing Agency(ies): lectricite de Djibouti WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Extension and Densification DJ-EDJ-55359-CW-RFB / of Distribution Systems Travaux de construction de 6 (US$22.6 million from IDA for Single Stage - One 2019-05- IDA / 60690 Post Request for Bids Open - National 43,845.48 Signed 2018-08-01 2018-09-06 2018-08-06 2018-09-17 2018-10-03 2018-10-17 2018-11-07 2018-11-21 2018-12-16 postes de transformateurs de extending the distribution Envelope 20 Balbala SUD grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-88336-CW-RFB / of Distribution Systems Travaux de construction de 10 (US$22.6 million from IDA for Single Stage - One 2019-09- IDA / 60690 Post Request for Bids Open - National 238,823.82 Signed 2018-12-10 2019-01-29 2018-12-15 2019-01-26 2019-03-06 2019-02-25 2019-04-17 2019-04-01 2019-05-13 postes de transformation à extending the distribution Envelope 28 Balbala SUD et NORD grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-100658-CW-DIR / (US$22.6 million from IDA for 2019-11- Travaux de construction des IDA / 60690 Prior Direct Selection Direct 634,197.51 Signed 2019-03-31 2019-04-05 2019-05-10 2019-06-16 extending the distribution 06 réseaux MT/BT/EP grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-100659-CW-DIR / (US$22.6 million from IDA for 2019-11- Travaux de construction des IDA / 60690 Prior Direct Selection Direct 578,872.66 Signed 2019-03-31 2019-04-05 2019-05-10 2019-06-10 extending the distribution 06 réseaux MT/BT/EP (2) grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-100661-CW-DIR / (US$22.6 million from IDA for 2019-11- Travaux de construction des IDA / 60690 Prior Direct Selection Direct 610,012.03 Signed 2019-03-28 2019-04-02 2019-05-07 2019-06-10 extending the distribution 03 réseaux MT/BT/EP (3) grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-117420-CW-RFQ / (US$22.6 million from IDA for Request for Single Stage - One 2020-03- Travaux de construction de IDA / 60690 Post Limited 52,552.24 Signed 2019-08-06 2019-07-03 2019-10-01 2019-09-23 extending the distribution Quotations Envelope 29 deux postes grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-164168-CW-RFQ / of Distribution Systems Travaux de construction de (US$22.6 million from IDA for Request for Single Stage - One 2021-01- IDA / 60690 Post Limited 198,928.92 Signed 2020-06-06 2020-07-20 2020-08-01 2020-09-23 réseau MT à Djibouti et dans extending the distribution Quotations Envelope 28 les régions grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-164169-CW-RFQ / (US$22.6 million from IDA for Request for Single Stage - One 2021-01- Travaux de construction de IDA / 60690 Post Limited 197,549.38 Signed 2020-06-06 2020-07-26 2020-08-01 2020-09-15 extending the distribution Quotations Envelope 28 réseau BT/EP à Djibouti grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-164170-CW-RFQ / of Distribution Systems Travaux de construction de (US$22.6 million from IDA for Request for Single Stage - One 2021-01- IDA / 60690 Post Limited 188,866.22 Signed 2020-06-06 2020-07-20 2020-08-01 2020-09-13 réseaux BT/EP dans les extending the distribution Quotations Envelope 28 régions intérieurs grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-185416-CW-RFQ / of Distribution Systems Travaux de construction de (US$22.6 million from IDA for Request for Single Stage - One 2021-03- IDA / 60690 Post Limited 196,104.64 Signed 2020-07-26 2020-07-26 2020-09-20 2020-09-23 réseau BT/EP à Balbala et extending the distribution Quotations Envelope 19 Region grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-156331-CW-RFB / Request for of Distribution Systems Travaux de construction d'un Bids - Small Pending (US$22.6 million from IDA for Single Stage - One 2021-01- réseau de basse tension et IDA / 60690 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2020-04-01 2020-04-06 2020-05-18 2020-06-17 2020-07-22 extending the distribution Envelope 18 éclairage à Balbala SUD envelope ion grid and US$ 2 million from (NASSIB Phase I et phase II). process) EDD for 13,960 connections) Extension and Densification Request for DJ-EDJ-156336-CW-RFB / of Distribution Systems Bids - Small Pending Travaux de construction d'un (US$22.6 million from IDA for Single Stage - One 2021-03- IDA / 60690 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2020-06-01 2020-06-06 2020-07-18 2020-08-17 2020-09-21 réseau de moyenne tension à extending the distribution Envelope 20 envelope ion Balbala SUD (NASSIB phase II). grid and US$ 2 million from process) EDD for 13,960 connections) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Extension and Densification of Distribution Systems DJ-EDJ-51462-GO-RFQ / Pending (US$22.6 million from IDA for Request for Single Stage - One Acquisition des équipements IDA / 60690 Post Open - National 0.00 Implementati 2018-07-06 2018-08-31 2019-02-27 extending the distribution Quotations Envelope informatiques on grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-55303-GO-DIR / of Distribution Systems Acquisitions des des (US$22.6 million from IDA for IDA / 60690 Post Direct Selection Direct 155,631.13 Signed 2018-05-15 2018-05-09 2018-05-20 2018-04-12 2018-06-24 2018-06-10 2018-12-21 disjoncteurs +cellules avec extending the distribution câbles grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55930-GO-DIR / (US$22.6 million from IDA for Accessoires des cellules des IDA / 60690 Post Direct Selection Direct 18,692.38 Signed 2018-05-15 2018-05-09 2018-05-20 2018-04-23 2018-06-24 2018-06-26 2018-12-21 extending the distribution postes de transformateurs grid and US$ 2 million from EDD for 13,960 connections) Technical Assistance, DJ-EDJ-52247-GO-DIR / Capacity Building and Acquisition de deux licences IDA / 60690 Program Management Post Direct Selection Direct 20,515.94 Signed 2018-05-10 2018-05-24 2018-05-15 2018-06-19 2018-05-24 2018-12-16 SUCCÈS pour le service (US$0.7 million from IDA and comptabilité US$ 0.28 million from EDD) Extension and Densification of Distribution Systems DJ-EDJ-55936-GO-DIR / (US$22.6 million from IDA for IDA / 60690 Post Direct Selection Direct 56,199.81 Signed 2018-05-15 2018-05-09 2018-05-20 2018-05-17 2018-06-24 2018-06-10 2018-12-21 Acquisitions des embouts extending the distribution grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55284-GO-DIR / (US$22.6 million from IDA for Acquisitions des équipements IDA / 60690 Prior Direct Selection Direct 410,733.88 Signed 2018-05-10 2018-06-04 2018-05-15 2018-06-21 2018-06-19 2018-07-18 2018-12-16 extending the distribution de câbles et transformateurs grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55331-GO-DIR / (US$22.6 million from IDA for Acquisitions des poteaux en IDA / 60690 Post Direct Selection Direct 94,518.81 Signed 2018-05-15 2018-05-09 2018-05-20 2018-05-15 2018-06-24 2018-06-10 2018-12-21 extending the distribution bois grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55934-GO-DIR / (US$22.6 million from IDA for Acquisition des tableaux IDA / 60690 Post Direct Selection Direct 16,006.94 Signed 2018-05-15 2018-05-09 2018-05-20 2018-04-12 2018-06-24 2018-06-18 2018-12-21 extending the distribution urbains grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55943-GO-DIR / (US$22.6 million from IDA for Acquisitions des accessoires IDA / 60690 Post Direct Selection Direct 41,150.73 Signed 2018-05-15 2018-05-09 2018-05-20 2018-03-18 2018-06-24 2018-06-11 2018-12-21 extending the distribution du réseau BT grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55940-GO-DIR / (US$22.6 million from IDA for Acquisitions des accessoires IDA / 60690 Post Direct Selection Direct 17,788.86 Signed 2018-05-15 2018-05-09 2018-05-20 2018-03-28 2018-06-24 2018-06-14 2018-12-21 extending the distribution des postes grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55307-GO-DIR / (US$22.6 million from IDA for Acquisitions des câbles Basse IDA / 60690 Post Direct Selection Direct 117,181.21 Signed 2018-05-15 2018-05-09 2018-05-20 2018-03-11 2018-06-24 2018-06-10 2018-12-21 extending the distribution Tension (BT) + Accessoires grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55932-GO-DIR / (US$22.6 million from IDA for IDA / 60690 Post Direct Selection Direct 47,951.11 Signed 2018-05-15 2018-05-09 2018-05-20 2018-04-01 2018-06-24 2018-10-14 2018-12-21 Acquisitions des compteurs extending the distribution grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55326-GO-DIR / (US$22.6 million from IDA for Acquisitions des poteaux IDA / 60690 Prior Direct Selection Direct 580,398.78 Signed 2018-05-10 2018-06-05 2018-05-15 2018-06-26 2018-06-19 2018-07-15 2018-12-16 extending the distribution métalliques grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55335-GO-DIR / (US$22.6 million from IDA for Acquisitions des équipements IDA / 60690 Post Direct Selection Direct 117,424.57 Signed 2018-05-15 2018-05-09 2018-05-20 2018-04-01 2018-06-24 2018-07-15 2018-12-21 extending the distribution parafoudres grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55342-GO-DIR / (US$22.6 million from IDA for IDA / 60690 Post Direct Selection Direct 25,654.21 Signed 2018-05-15 2018-05-09 2018-05-20 2018-04-25 2018-06-24 2018-08-08 2018-12-21 Acquisitions des armements extending the distribution grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55312-GO-DIR / (US$22.6 million from IDA for Acquisitions de buse et de IDA / 60690 Post Direct Selection Direct 52,786.35 Signed 2018-05-15 2018-05-09 2018-05-20 2018-05-15 2018-06-24 2018-07-15 2018-12-21 extending the distribution grillage grid and US$ 2 million from EDD for 13,960 connections) Page 2 Extension and Densification of Distribution Systems DJ-EDJ-55938-GO-DIR / (US$22.6 million from IDA for Acquisitions des boulons IDA / 60690 Post Direct Selection Direct 2,520.19 Signed 2018-05-15 2018-05-09 2018-05-20 2018-05-01 2018-06-24 2018-06-21 2018-12-21 extending the distribution Galvanisés 12x50 grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-60223-GO-DIR / (US$22.6 million from IDA for IDA / 60690 Post Direct Selection Direct 116,106.67 Signed 2018-05-15 2018-05-09 2018-05-20 2018-04-12 2018-06-24 2018-05-24 2018-12-21 Acquisition des lampes extending the distribution grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-55946-GO-RFQ / of Distribution Systems Acquisitions des petits (US$22.6 million from IDA for Request for Single Stage - One IDA / 60690 Post Open - National 31,675.78 Signed 2018-05-20 2018-07-15 2020-07-28 2019-01-11 accessoires pour le réseau et extending the distribution Quotations Envelope postes grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-56542-GO-DIR / of Distribution Systems Pending Acquisition de tous les (US$22.6 million from IDA for IDA / 60690 Post Direct Selection Direct 0.00 Implementati 2018-06-30 2018-07-03 2018-10-21 2019-01-19 équipements électriques pour extending the distribution on les 245 logements grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-52245-GO-RFB / (US$22.6 million from IDA for Single Stage - One Acquisitions des véhicules IDA / 60690 Post Request for Bids Open - National 243,970.84 Signed 2018-12-16 2019-05-29 2018-12-21 2019-02-01 2019-07-03 2019-03-03 2019-09-18 2019-04-07 2019-10-24 2019-10-04 extending the distribution Envelope pour l'UGP grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-88332-GO-RFQ / Pending (US$22.6 million from IDA for Request for Single Stage - One Acquisition des appareils de IDA / 60690 Post Open - National 0.00 Implementati 2019-01-11 2019-03-08 2019-09-04 extending the distribution Quotations Envelope mesures de test et essais on grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-88346-GO-RFQ / of Distribution Systems Pending Acquisitions des matériels des (US$22.6 million from IDA for Request for Single Stage - One IDA / 60690 Post Open - National 0.00 Implementati 2019-01-20 2019-03-17 2019-09-13 déroulages (vérins,poulies extending the distribution Quotations Envelope on etc...) grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-97801-GO-RFQ / (US$22.6 million from IDA for Request for Single Stage - One Acquisition des équipements IDA / 60690 Post Limited 45,067.41 Signed 2019-02-25 2019-02-10 2019-04-22 2019-08-21 2019-10-19 extending the distribution Quotations Envelope de mesures grid and US$ 2 million from EDD for 13,960 connections) DJ-EDJ-55355-GO-RFB / Extension and Densification Acquisitions des supports of Distribution Systems métalliques, supports en bois, (US$22.6 million from IDA for Single Stage - One cellules&tableau de IDA / 60690 Prior Request for Bids Open - International 1,756,204.77 Signed 2019-06-15 2019-06-05 2019-06-20 2019-06-19 2019-08-01 2019-09-04 2019-08-31 2020-01-23 2019-10-05 2020-01-30 2020-04-02 extending the distribution Envelope distribution TUR & grid and US$ 2 million from transformateurs et câbles EDD for 13,960 connections) éléctriques de BT & MT Extension and Densification DJ-EDJ-53401-GO-RFB / of Distribution Systems Acquisition des équipements (US$22.6 million from IDA for Single Stage - One de réseau MT et de 6 postes IDA / 60690 Prior Request for Bids Open - International 1,534,269.04 Signed 2018-05-02 2019-09-30 2018-05-07 2019-12-10 2018-06-18 2020-01-08 2018-07-18 2020-06-22 2018-08-22 2020-10-04 2019-02-18 extending the distribution Envelope de transformateurs (En grid and US$ 2 million from plusieurs lots) EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55935-GO-DIR / (US$22.6 million from IDA for Acquisition des caches vis en IDA / 60690 Post Direct Selection Direct 0.00 Canceled 2018-06-30 2018-07-05 2018-08-09 2019-02-05 extending the distribution laiton grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-55323-GO-DIR / (US$22.6 million from IDA for IDA / 60690 Post Direct Selection Direct 0.00 Canceled 2018-05-15 2018-05-20 2018-06-24 2018-12-21 Acquisition de serrures extending the distribution grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-154535-GO-RFQ / (US$22.6 million from IDA for Request for Single Stage - One Acquisition d'une forklift de 3 IDA / 60690 Post Limited 30,035.11 Signed 2020-02-07 2020-03-03 2020-04-03 2020-04-15 2020-09-30 extending the distribution Quotations Envelope tonnes grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-154766-GO-RFQ / (US$22.6 million from IDA for Request for Single Stage - One Acquisitions des tableaux en IDA / 60690 Post Limited 27,131.03 Signed 2020-03-06 2020-02-09 2020-05-01 2020-11-23 2020-10-28 extending the distribution Quotations Envelope bois pour compteurs. grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-154511-GO-RFB / (US$22.6 million from IDA for Single Stage - One Acquisitions des câbles IDA / 60690 Post Request for Bids Open - International 888,029.36 Signed 2020-05-03 2020-02-24 2020-05-08 2020-02-24 2020-06-19 2020-06-03 2020-07-19 2020-07-22 2020-08-23 2020-09-06 2021-02-19 extending the distribution Envelope électriques de BT et de MT grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-188133-GO-DIR / (US$22.6 million from IDA for Acquisition du câble 3x150 IDA / 60690 Post Direct Selection Direct 62,648.50 Signed 2020-08-10 2020-07-27 2020-08-15 2020-07-27 2020-09-19 2020-09-06 2021-03-18 extending the distribution mm²+1x70 mm² Aluminium grid and US$ 2 million from EDD for 13,960 connections) Page 3 Technical Assistance, DJ-EDJ-236509-GO-RFQ / Capacity Building and Pending Acquisitions des équipements Request for Single Stage - One IDA / 60690 Program Management Post Limited 0.00 Implementati 2021-06-06 2021-08-01 2022-01-28 informatiques: (complément Quotations Envelope (US$0.7 million from IDA and on d'équipement) US$ 0.28 million from EDD) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Extension and Densification DJ-EDJ-56546-NC-DIR / of Distribution Systems Pending Installations en réseau des (US$22.6 million from IDA for IDA / 60690 Post Direct Selection Direct 0.00 Implementati 2018-08-01 2018-08-04 2018-08-24 2018-11-22 branchements de 245 extending the distribution on logements grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-143776-NC-RFQ / of Distribution Systems Pending Services d'installation des (US$22.6 million from IDA for Request for Single Stage - One IDA / 60690 Post Limited 0.00 Implementati 2019-01-06 2019-03-03 2019-08-30 equipements de 6 postes en extending the distribution Quotations Envelope on deux lots grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-120881-NC-RFQ / of Distribution Systems Services d'installation des (US$22.6 million from IDA for Request for Single Stage - One IDA / 60690 Post Limited 0.00 Canceled 2019-07-05 2019-07-03 2019-08-30 2020-02-26 équipements de 6 postes en extending the distribution Quotations Envelope deux lots grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification DJ-EDJ-55363-NC-RFP / of Distribution Systems Services d'installations des (US$22.6 million from IDA for Single Stage - One IDA / 60690 Post Request for Bids Open - National 0.00 Canceled 2018-07-30 2019-07-03 2018-08-04 2018-09-15 2018-10-15 2018-11-19 2019-05-18 équipements de 6 postes de extending the distribution Envelope transformateurs de Balbala grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-156184-NC-RFB / Pending (US$22.6 million from IDA for Single Stage - One DAO services d'installation IDA / 60690 Post Request for Bids Open - National 0.00 Implementati 2020-02-13 2020-02-18 2020-03-31 2020-04-30 2020-06-04 2020-12-01 extending the distribution Envelope des équipements de 6 postes on grid and US$ 2 million from EDD for 13,960 connections) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Extension and Densification of Distribution Systems DJ-EDJ-50046-CS-QCBS / (US$22.6 million from IDA for Quality And Cost- Under Etude d'un schéma directeur IDA / 60690 Post Open - International 0.00 2018-05-27 2018-06-17 2018-07-31 2018-08-28 2018-09-27 2018-11-01 2018-12-06 2019-12-06 extending the distribution Based Selection Implementation (Distribution et production) grid and US$ 2 million from EDD for 13,960 connections) Extension and Densification of Distribution Systems DJ-EDJ-50036-CS-LCS / (US$22.6 million from IDA for Least Cost Under Recrutement d'un cabinet IDA / 60690 Post Open - National 0.00 2018-05-20 2018-05-22 2018-06-10 2018-07-24 2019-01-16 2018-08-21 2019-02-20 2018-09-20 2019-03-20 2018-10-25 2019-04-17 2018-11-29 2019-05-28 extending the distribution Selection Implementation d'audit financier et technique grid and US$ 2 million from EDD for 13,960 connections) Technical Assistance, DJ-EDJ-88337-CS-QCBS / Capacity Building and Recrutement d'un cabinet Quality And Cost- Under IDA / 60690 Program Management Post Open - National 0.00 2018-12-06 2020-02-24 2018-12-27 2020-03-10 2019-02-09 2020-06-24 2019-03-09 2019-04-08 2019-05-13 2019-06-17 2020-06-16 d'audit technique (audit de Based Selection Implementation (US$0.7 million from IDA and performance) US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-154767-CS-QCBS / Capacity Building and Étude d'un schéma directeur Quality And Cost- Under IDA / 60690 Program Management Post Open - International 0.00 2020-05-03 2020-02-10 2020-05-24 2020-02-24 2020-07-07 2020-09-30 2020-08-04 2020-09-03 2020-10-08 2020-11-12 2021-11-12 (Distribution) et auto Based Selection Implementation (US$0.7 million from IDA and production US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-236548-CS-LCS / Capacity Building and Recrutement d'un cabinet Least Cost Pending IDA / 60690 Program Management Post Open - National 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2022-07-08 d'audit pour les exercices Selection Implementation (US$0.7 million from IDA and 2021,2022 et 2023. US$ 0.28 million from EDD) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Technical Assistance, DJ-EDJ-143763-CS-CDS / Capacity Building and Pending Recrutement de l'expert en IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation environnement (US$0.7 million from IDA and US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143770-CS-CDS / Capacity Building and Pending Recrutement de l'expert socio- IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation économique (US$0.7 million from IDA and US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143761-CS-CDS / Capacity Building and Pending Recrutement de l'expert en IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation passation (US$0.7 million from IDA and US$ 0.28 million from EDD) Page 4 Technical Assistance, DJ-EDJ-143771-CS-CDS / Capacity Building and Pending Recrutement d'un chef de IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation projet adjoint (US$0.7 million from IDA and US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143762-CS-CDS / Capacity Building and Pending Recrutement d'une assistante IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation de direction (US$0.7 million from IDA and US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143773-CS-CDS / Capacity Building and Pending Recrutement d'un assistant de IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation logistique (US$0.7 million from IDA and US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143772-CS-CDS / Capacity Building and Pending Recrutement d'un ingénieur 1 IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation (Farhan) (US$0.7 million from IDA and US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143769-CS-CDS / Capacity Building and Pending Recrutement d'un ingénieur 2 IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation (Zahra) (US$0.7 million from IDA and US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143774-CS-CDS / Capacity Building and Pending Recrutement d'un technicien IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 Implementation supérieur (US$0.7 million from IDA and US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143768-CS-CDS / Capacity Building and Recrutement d'une Pending IDA / 60690 Program Management Post Direct Selection Direct 0.00 2019-09-01 2019-09-11 2019-11-15 2020-05-13 responsable de gestion Implementation (US$0.7 million from IDA and financière US$ 0.28 million from EDD) Technical Assistance, DJ-EDJ-143775-CS-CDS / Capacity Building and Under Recrutement d'un chef de IDA / 60690 Program Management Post Direct Selection Direct 0.00 2020-02-01 2019-10-17 2020-02-11 2020-04-16 2020-10-13 Implementation projet (US$0.7 million from IDA and US$ 0.28 million from EDD) Page 5 PROCUREMENT Uganda : Irrigation for Climate Resilience Project (ICRP) PLAN General Information Country: Uganda Bank’s Approval Date of the Original Procurement Plan: 2019-01-08 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163836 GPN Date: Project Name: Irrigation for Climate Resilience Project (ICRP) Loan / Credit No: / , TF / A9023, IDA / 65650 Ministry of Water and Environment Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned UG-MWE-165320-CW-RFB / Under Works for Construction of Single Stage - One 20,220,000.0 2024-02- IDA / 65650 Comp. 1 - Irrigation Services Prior Request for Bids Open - International 0.00 Implementat 2020-07-17 2020-12-23 2020-08-16 2020-12-24 2020-09-30 2020-12-04 2021-02-08 Kabuyanda Dam in Isingiro Envelope 0 08 ion District UG-MWE-219013-CW-RFB / Construction works for Single Stage - Two 19,080,000.0 Under 2023-09- Kabuyanda Off-Farm Network IDA / 65650 Comp. 1 - Irrigation Services Prior Request for Bids Open - International 0.00 2021-02-19 2021-04-09 2021-06-04 2021-08-17 2021-09-21 Envelope 0 Review 21 up to the block in Isingiro District UG-MWE-230714-CW-RFB / Request for Bids - Under Works for Construction of Single Stage - Two Works (without 20,220,000.0 2024-08- IDA / 65650 Comp. 1 - Irrigation Services Prior Request for Bids Open - International 0.00 Implementat 2020-12-23 2021-04-21 2020-12-29 2021-04-21 2021-04-20 2021-04-20 2021-07-14 2021-08-18 Kabuyanda Dam in Isingiro Envelope prequalification) 0 17 ion District SPD GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MWE-204550-GO-RFQ / Procurement of assorted indigenous seedlings for restoration planting and Pending Single Stage - One maintenance of: IDA / 65650 Comp. 1 - Irrigation Services Post Request for Bids Limited 300,000.00 0.00 Implementati 2020-12-11 2020-12-16 2021-01-27 2021-02-26 2021-04-02 2021-09-29 Envelope Lot 1- 250,000 seedlings for on Rwoho 1 Lot 2- 250,000 seedlings for Rwoho 2 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MWE-165038-NC-RFQ / Provision of hotel services(accommodation and Comp. 3 - Institutional Pending Request for Single Stage - One meals) and conferencing TF / A9023 Strengthening and Post Limited 28,800.00 0.00 Implementati 2020-07-23 2020-09-04 2020-09-18 Quotations Envelope facilities for Staff Training on Implementation Support on capacity building on engineering software UG-MWE-183725-NC-RFB / Procurement of Non- Single Stage - One Consultancy Services to IDA / 65650 Comp. 1 - Irrigation Services Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2020-07-17 2020-07-30 2020-08-24 2020-09-23 2020-10-28 2021-10-28 Envelope undertake Rwoho Reafforestation UG-MWE-204547-NC-RFQ / Non Consulting services for Pending Restoration planting and Single Stage - One IDA / 65650 Comp. 1 - Irrigation Services Post Request for Bids Limited 700,000.00 0.00 Implementati 2020-12-04 2020-12-09 2021-01-20 2021-02-19 2021-03-26 2024-03-25 maintenance of : Envelope on Lot 1: 500HA -Rwoho 1 Lot 2: 500HA -Rwoho 2 UG-MWE-232817-NC-DIR / Pending Procurement of catering IDA / 65650 Comp. 1 - Irrigation Services Post Direct Selection Direct 4,400.00 0.00 Implementati 2021-05-06 2021-05-11 2021-06-15 2021-07-15 services for the ICRP Project on Launch UG-MWE-232833-NC-DIR / Procurement of mobile Public Pending Request for Single Stage - One Address systems and IDA / 65650 Comp. 1 - Irrigation Services Post Limited 7,000.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 Quotations Envelope including multi screen video on Conference facilities. UG-MWE-232825-NC-DIR / Procurement of printing Pending Request for Single Stage - One services for IEC materials for IDA / 65650 Comp. 1 - Irrigation Services Post Limited 44,000.00 0.00 Implementati 2021-06-05 2021-07-31 2022-01-27 Quotations Envelope project launch and GRC on training. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MWE-89181-CS-QCBS / Consultancy services to carry Quality And Cost- Under out Feasibility Studies for / Comp. 1 - Irrigation Services Prior Open - International 500,000.00 0.00 2018-12-27 2019-01-11 2019-01-10 2019-06-27 2019-02-23 2020-12-06 2019-03-13 2021-01-29 2019-04-12 2019-05-17 2019-06-21 2020-06-20 Based Selection Implementation Amagoro Irrigation Scheme in Tororo District Page 1 UG-MWE-89184-CS-QCBS / Consultancy services to carry Quality And Cost- out Design for Amagoro / Comp. 1 - Irrigation Services Prior Open - International 500,000.00 0.00 Canceled 2018-12-27 2019-01-10 2019-02-21 2019-03-14 2019-04-13 2019-05-18 2019-06-22 2020-06-21 Based Selection Irrigation Scheme in Tororo District UG-MWE-165064-CS-QCBS / Supervision of Construction Quality And Cost- Under works for Kabuyanda Dam & IDA / 65650 Comp. 1 - Irrigation Services Prior Open - International 3,572,000.00 0.00 2020-07-17 2020-08-04 2020-08-07 2020-09-09 2020-09-20 2021-06-21 2020-10-18 2020-11-17 2020-12-22 2021-01-26 2024-04-25 Based Selection Implementation Irrigation Scheme Network in Isingiro District UG-MWE-165070-CS-QCBS / Consultancy Services to undertake Supervision of Environmental and Social Safe Quality And Cost- Under IDA / 65650 Comp. 1 - Irrigation Services Prior Open - National 1,314,500.00 0.00 2020-07-16 2020-11-01 2020-08-06 2021-01-25 2020-09-19 2020-10-17 2020-11-16 2020-12-21 2021-01-25 2023-07-26 guards Implementation in the Based Selection Implementation construction of Kabuyanda dam and irrigation scheme in Isingiro District UG-MWE-165199-CS-QCBS / Consultancy Services to Consultant prepare a micro catchment Under IDA / 65650 Comp. 1 - Irrigation Services Post Qualification Open - National 300,000.00 0.00 2020-07-17 2020-07-16 2020-08-07 2020-09-20 2020-10-20 2020-11-24 2021-05-23 management plan for the Implementation Selection micro-catchment around Kabuyanda irrigation scheme UG-MWE-165319-CS-QCBS / Consultancy Services to Consultant prepare a micro catchment Under IDA / 65650 Comp. 1 - Irrigation Services Post Qualification Open - National 300,000.00 0.00 2020-07-17 2020-07-16 2020-08-07 2020-09-20 2020-10-20 2020-11-24 2021-05-23 management plan for the Implementation Selection micro-catchment around Matanda irrigation scheme UG-MWE-165067-CS-QCBS / Consultancy Services for Implementation Support for Quality And Cost- Sustainable Management of IDA / 65650 Comp. 1 - Irrigation Services Prior Open - International 1,700,000.00 0.00 Canceled 2020-07-16 2020-08-06 2020-09-19 2020-10-17 2020-11-16 2020-12-21 2021-01-25 2025-01-24 Based Selection Kabuyanda Irrigation Scheme Infrastructure in Isingiro District UG-MWE-189803-CS-CQS / Consultancy Services to Comp. 3 - Institutional Consultant undertake a project baseline IDA / 65650 Strengthening and Post Qualification Open - National 133,333.00 0.00 Under Review 2020-08-31 2021-06-15 2020-09-21 2020-11-04 2020-12-04 2021-01-08 2021-07-07 study (gender sensitive) for Implementation Support Selection the ICRP. UG-MWE-188203-CS-QCBS / Consultancy Services for Comp. 2 - Support Services provision of agricultural for Agricultural Production Quality And Cost- IDA / 65650 Prior Open - National 1,550,300.00 0.00 Under Review 2020-10-23 2020-11-13 2020-12-27 2021-01-24 2021-02-23 2021-03-30 2021-05-04 2023-05-04 extension services to improve and Value Chain Based Selection production and productivity in Development Kabuyanda irrigation scheme UG-MWE-186214-CS-QCBS / Lot 2: Consultancy Services Comp. 2 - Support Services for provision of agricultural for Agricultural Production Quality And Cost- IDA / 65650 Prior Open - International 547,024.00 0.00 Under Review 2020-10-23 2020-11-13 2020-12-27 2021-01-24 2021-02-23 2021-03-30 2021-05-04 2023-05-04 extension services to improve and Value Chain Based Selection production and productivity in Development Agoro irrigation scheme. UG-MWE-186210-CS-QCBS / Lot 1: Consultancy Services Comp. 2 - Support Services for provision of agricultural for Agricultural Production Quality And Cost- IDA / 65650 Prior Open - International 360,600.00 0.00 Under Review 2020-10-23 2020-11-13 2020-12-27 2021-01-24 2021-02-23 2021-03-30 2021-05-04 2023-05-04 extension services to improve and Value Chain Based Selection production and productivity in Development Olweny irrigation scheme. UG-MWE-189779-CS-QCBS / Consultancy Services for Implementation Support for Quality And Cost- Under Off-Farm infrastructure IDA / 65650 Comp. 1 - Irrigation Services Prior Open - National 1,100,000.00 0.00 2020-12-04 2020-12-25 2021-02-07 2021-03-07 2021-04-06 2021-05-11 2021-06-15 2024-06-14 Based Selection Implementation development of Kabuyanda Irrigation scheme in Isingiro District UG-MWE-186647-CS-QCBS / LOT 1: Consultancy services Comp. 2 - Support Services for value chain development for Agricultural Production Quality And Cost- IDA / 65650 Prior Open - International 900,595.00 0.00 Under Review 2020-12-04 2020-12-25 2021-02-07 2021-03-07 2021-04-06 2021-05-11 2021-06-15 2025-06-14 (studies, platforms and and Value Chain Based Selection linkages) in Kabuyanda & Development Matanda UG-MWE-186650-CS-QCBS / Comp. 2 - Support Services LOT 2: Consultancy services for Agricultural Production Quality And Cost- for value chain development IDA / 65650 Prior Open - International 878,120.00 0.00 Under Review 2020-12-04 2020-12-25 2021-02-07 2021-03-07 2021-04-06 2021-05-11 2021-06-15 2025-06-14 and Value Chain Based Selection (studies, platforms and Development linkages) in Olweny and Agoro UG-MWE-204499-CS-CQS / Consultant Consultancy Services for ESIA IDA / 65650 Comp. 1 - Irrigation Services Post Qualification Open - National 400,000.00 0.00 Under Review 2020-12-04 2021-02-23 2020-12-25 2021-02-07 2021-03-09 2021-04-13 2023-04-13 studies for Amagoro Selection UG-MWE-204537-CS-QCBS / Consultancy Services for the development of Off-Farm Quality And Cost- Infrastructure management IDA / 65650 Comp. 1 - Irrigation Services Post Open - National 500,000.00 0.00 Under Review 2020-12-04 2021-06-15 2020-12-25 2021-02-07 2021-03-07 2021-04-06 2021-05-11 2021-06-15 2022-12-15 Based Selection model and its establishment for the Kabuyanda irrigation scheme in Isingiro District. UG-MWE-204541-CS-CQS / Consultancy services to Consultant implement and support Under IDA / 65650 Comp. 1 - Irrigation Services Post Qualification Open - National 250,000.00 0.00 2020-12-04 2021-02-23 2020-12-25 2021-06-01 2021-02-07 2021-03-09 2021-04-13 2022-04-13 GBV/VAC activities by NGO in Implementation Selection Kabuyanda irrigation scheme in Isingiro district. UG-MWE-204546-CS-CQS / Consultancy services for Consultant undertaking HIV/AIDS/COVID IDA / 65650 Comp. 1 - Irrigation Services Post Qualification Open - National 150,000.00 0.00 Under Review 2020-12-04 2021-04-06 2020-12-25 2021-02-07 2021-03-09 2021-04-13 2021-10-10 19 mainstreaming for the Selection Kabuynda irrigation scheme in Isingiro District Page 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MWE-140235-CS-CDS / Consultancy Services for Under Detailed Design for Matanda TF / A9023 Comp. 1 - Irrigation Services Prior Direct Selection Direct 500,000.00 0.00 2019-10-22 2019-11-27 2019-11-01 2019-12-17 2020-01-05 2020-12-30 Implementation Irrigation Scheme in Kanungu District UG-MWE-156897-CS-INDV / INDIVIDUAL CONSULTANT DAM DESIGN AND CONSTRUCTION SPECIALIST AS A MEMBER OF THE DAM Comp. 3 - Institutional Individual SAFETY PANEL OF EXPERTS Under TF / A9023 Strengthening and Post Consultant Direct 37,000.00 0.00 2020-02-07 2020-08-27 2020-02-17 2020-03-02 2020-03-16 2020-04-15 (DSPE) TO REVIEW DETAILED Implementation Implementation Support Selection DESIGN FOR MATANDA IRRIGATION SCHEME UNDER THE IRRIGATION FOR CLIMATE RESILIENCE - Mrs.Ljiljana Spasic-Gril UG-MWE-156898-CS-INDV / INDIVIDUAL CONSULTANT GEOLOGIST/GEOTECHNICAL EXPERT AS AMEMBER OF DAM SAFETY PANEL OF EXPERTS Comp. 3 - Institutional Individual Under (DSPE) TO REVIEW DETAILED TF / A9023 Strengthening and Post Consultant Direct 37,000.00 0.00 2020-02-07 2020-08-27 2020-02-17 2020-03-02 2020-03-30 2020-04-02 Implementation DESIGN FOR KABUYANDA Implementation Support Selection IRRIGATION SCHEME UNDER THE IRRIGATION FOR CLIMATE RESILIENCE PROJECT (ICRP)- Mr Pavlos G.Marinos UG-MWE-156899-CS-INDV / INDIVIDUAL CONSULTANT HYDROLOGIST AS MEMBER OF THE DAM SAFETY PANEL OF EXPERTS (DSPE) TO REVIEW Comp. 3 - Institutional Individual Under DETAILED DESIGN FOR TF / A9023 Strengthening and Post Consultant Direct 37,000.00 0.00 2020-02-07 2020-08-27 2020-02-17 2020-03-02 2020-03-30 2020-04-29 Implementation MATANDA IRRIGATION Implementation Support Selection SCHEME UNDER THE IRRIGATION FOR CLIMATE RESILIENCE PROJECT (ICRDP) - Mr Henry Kayondo Ntale UG-MWE-165062-CS-CQS / Preparation of additional studies and surveys for the Under TF / A9023 Comp. 1 - Irrigation Services Post Direct Selection Direct 95,000.00 0.00 2020-07-30 2020-07-24 2020-08-09 2020-10-13 2021-05-11 Environmental and Social Implementation Impact Assessment (ESIA) for Kabuyanda Irrigation Scheme UG-MWE-185126-CS-INDV / Consultancy Services for Individual Specialist Individual (Hydrologist) as Panel of Dam IDA / 65650 Comp. 1 - Irrigation Services Post Consultant Open 250,000.00 0.00 Canceled 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Safety Experts for Selection Construction Supervision of Kabuyanda and Matanda Dams UG-MWE-185128-CS-INDV / Consultancy Services for Individual Specialist ( Individual Geologist) as Panel of Dam IDA / 65650 Comp. 1 - Irrigation Services Post Consultant Open 250,000.00 0.00 Canceled 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Safety Experts for Selection construction Supervision of Kabuyanda and Matanda Dams UG-MWE-186652-CS-INDV / Procurement of individual Comp. 3 - Institutional Individual consultant for the position of Under IDA / 65650 Strengthening and Post Consultant Open 135,000.00 0.00 2020-08-06 2020-08-27 2020-09-24 2020-10-15 2020-11-19 2022-11-19 Project Environment Implementation Implementation Support Selection Safeguards Specialist as part of the PST UG-MWE-186655-CS-INDV / Procurement of an individual Comp. 3 - Institutional Individual Under consultant for the position of IDA / 65650 Strengthening and Post Consultant Open 135,000.00 0.00 2020-08-07 2020-08-27 2020-09-25 2020-10-16 2020-11-20 2022-11-20 Implementation Project Social Safeguards Implementation Support Selection Specialist to support the PST UG-MWE-186656-CS-INDV / Procurement of an individual Comp. 3 - Institutional Individual Under consultant for the position of IDA / 65650 Strengthening and Post Consultant Open 135,000.00 0.00 2020-08-06 2020-08-27 2020-09-24 2020-10-15 2020-11-19 2022-11-19 Implementation Project Procurement Specialist Implementation Support Selection as part of the PST UG-MWE-186657-CS-INDV / Comp. 3 - Institutional Individual Procurement of an individual Under IDA / 65650 Strengthening and Post Consultant Open 135,000.00 0.00 2020-08-06 2020-08-27 2020-09-24 2020-10-15 2020-11-19 2022-11-19 consultant for the position of Implementation Implementation Support Selection Project M&E Specialist UG-MWE-186665-CS-INDV / Procurement of an Individual Comp. 3 - Institutional Individual Under consultant for the position of IDA / 65650 Strengthening and Post Consultant Open 135,000.00 0.00 2020-08-07 2020-08-27 2020-09-25 2020-10-16 2020-11-20 2022-11-20 Implementation the Project Agri-Business Implementation Support Selection Specialist UG-MWE-186666-CS-INDV / Procurement of an individual Comp. 3 - Institutional Individual Under consultant for the position of IDA / 65650 Strengthening and Post Consultant Open 90,000.00 0.00 2020-08-07 2020-08-27 2020-09-25 2020-10-16 2020-11-20 2022-11-20 Implementation Project Support Officer/ Implementation Support Selection Communications Officer UG-MWE-186202-CS-CDS / Procurement of an individual Comp. 3 - Institutional consultant to undertake the Pending TF / A9023 Strengthening and Post Direct Selection Direct 18,000.00 0.00 2020-08-28 2020-09-07 2020-10-28 2021-01-26 HEC RAS and GeoStudio Implementation Implementation Support Training for the implementation agency staff. Page 3 UG-MWE-185129-CS-INDV / Consultancy Services for Individual Specialist(Dam Individual Engineer ) as Panel of Dam IDA / 65650 Comp. 1 - Irrigation Services Post Consultant Open 250,000.00 0.00 Canceled 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Safety Experts for Selection construction Supervision of Kabuyanda and Matanda Dams UG-MWE-196180-CS-INDV / Consultancy Services for Individual Specialist ( Individual Under Geologist) as Panel of Dam IDA / 65650 Comp. 1 - Irrigation Services Post Consultant Direct 250,000.00 0.00 2020-10-02 2021-02-19 2020-10-12 2020-11-02 2020-12-07 2022-12-07 Implementation Safety Experts for Selection construction Supervision of Kabuyanda and Matanda Dams UG-MWE-196176-CS-INDV / Consultancy Services for Individual Specialist Individual (Hydrologist) as Panel of Dam IDA / 65650 Comp. 1 - Irrigation Services Post Consultant Direct 250,000.00 0.00 Under Review 2020-10-02 2021-02-19 2020-10-12 2020-11-02 2020-12-07 2022-12-07 Safety Experts for Selection Construction Supervision of Kabuyanda and Matanda Dams UG-MWE-196185-CS-INDV / Consultancy Services for Individual Specialist(Dam Individual Engineer ) as Panel of Dam IDA / 65650 Comp. 1 - Irrigation Services Post Consultant Direct 250,000.00 0.00 Under Review 2020-10-02 2021-02-19 2020-10-12 2020-11-02 2020-12-07 2022-12-07 Safety Experts for Selection construction Supervision of Kabuyanda and Matanda Dams Page 4 Coopération Cameroun – Banque Mondiale Ministère de l’Habitat et du Développement Urbain Ministry of Housing and Urban Development SECRETARIAT GENERAL- GENERAL SECRETARIAT Cellule de Préparation – Preparation Unit Projet de Développement des Villes Inclusives – Preparation of the proposed Cameroon Inclusive Cities Project PPA IDA V0100 PLAN DE PASSATION DES MARCHES-JANVIER 2017 VERSION N°4 I. GENERAL 1. Informations sur le Projet Emprunteur : REPUBLIQUE DU CAMEROUN Ministère Responsable: MINISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN Nom du Projet : Projet de Développement des Villes Inclusives au Cameroun (PDVI) Agence d’exécution du Projet en phase de préparation: Cellule de Préparation du PDVI (CP/PDVI). 2. Date d’approbation de la version originale (version N°1) par la Banque du Plan de Passation des Marchés : 12/01/2016 3. Date de publication de l’Avis Général de Passation des Marchés: 4. Période couverte par le Plan de Passation des Marchés : 1er janvier 2017 au 31 décembre 2017 5. Evaluation de risque par P-RAMS (Procurement Risk Asses ment and Management System) : Elevé II. TRAVAUX, FOURNITURES ET SERVICES NON INTELLECTUELS 1. Dispositions relatives aux seuils de revue préalable : seuils requis pour les décisions de marchés soumis à la 1 revue préalable de la Banque, tel que prévu dans l’annexe 1 des "Directives de Passation des Marchés de fournitures, de travaux et de services (autres que les services de consultants) par les Emprunteurs de la Banque mondiale dans le cadre des prêts de la BIRD et des crédits de l’AID". Catégories de Seuils de revue Observations marchés/Méthode de passation a priori des marchés Montants estimatifs des contrats en millions de dollars américains Travaux, Contrats clé en main et Contrats de Fourniture et Montage >= 5 d’Installations Fournitures, Système d’information, et Services autres que les services >= 1.5 de consultants Travaux, Contrats clé en main et Contrats de >= 5 Les Fourniture et justifications de Montage Contrats à passer l’entente d’Installations par entente directe devront Fournitures, directe être jointes et Système approuvées d’information, avec le PPM et Services >= 1.5 autres que les services de consultants 2. Pré qualification : les soumissionnaires, en cas de pré- qualification, (voir dans le tableau ci-joint) seront pré qualifiées en accord avec les dispositions des paragraphes 2.9 et 2.10 des directives. 3. Seuils pour les méthodes de passation des marchés : les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES (US$ TRAVAUX (US$ équivalent) équivalent) 2 AOI AON CF AOI AON CF ≥10,000,00 <10,000, < ≥1,000, <1,000,00 < 0 000 200,000 000 0 100,000 4. Dispositions spéciales sur les marchés : concernant les acquisitions de véhicules et de carburant, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur d’USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque ou distributeurs de produits pétroliers). 5. Liste des marchés de fourniture Coût Coût Revue Date Observat Méthod Estimatif Estimati par la prévue ions/ Réf e de Description (USD) f Banque de Date fin . sélectio prestatio HTVA (USD) (Priori/P l'ouvert n ns TTC ost) ure Gestion du projet Acquisition d'un logiciel comptable et suivi-évaluation Date de (TOM2PRO/TOM2MO 43,725 clôture 1 36,667 SED Post N/A NITORING) y compris du la formation et projet l’assistance technique Renouvellement Contrat annuel de gardiennage des biens et locaux de la 31/12/1 2 Cellule de 7,200 8,587 SED Post N/A Préparation du Projet 7 de Développement des villes Inclusives (PDVI) Renouvellement du contrat annuel de la Couverture médicale du personnel de la 43,725 28/05/1 3 Cellule de 36,667 SED Post N/A Préparation du Projet 8 de Développement des villes Inclusives (PDVI) Marché à commande 31/05/1 4 pour la maintenance 27,926 33,300 SED Post N/A des véhicules du 8 3 Projet pour une durée d’un an Fourniture de 18/04/1 08/05/1 5 mobilier pour la 45,833 54,656 CF Post CP/PDVI 7 7 Total 183,99 154,293 3 III. SÉLECTION DES CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable des marchés : décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans l’annexe 1 du Guide de Sélection et d’Emploi des Consultants par les Emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID. Méthode de Seuils de revue Observations sélection/Catégories de a priori marchés Montants estimatifs des contrats en millions de dollars américains Méthode compétitive/Firmes >= 0.5 de consultants Entente directe/firmes de >= 0.5 consultants Les justifications de Entente directe/Consultants >= 0.2 l’entente directe devront individuel être jointes et approuvées Méthode Compétitive >= 0.2 avec le PPM (Comparaison de CVs)/ Consultants individuels 2. Liste restreinte composée entièrement de firmes nationales: la liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du paragraphe 2.7 des Directives de Sélection et d’Emploi des Consultants, et l’Emprunteur ne procède pas à une publication dans UNDB. 3. Autre arrangement spécial de Sélection de consultants : le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est 4 déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; cependant, ce seuil ne devrait pas dépasser la contre-valeur de USD 300,000 sauf dans des cas exceptionnels prévus au paragraphe 3.7 des directives pour la sélection et l’emploi des consultants par les emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID. 4. Liste des Consultations, avec les méthodes de sélection et les dates de mise en œuvre CONSULTANTS 1 2 3 4 5 6 7 8 9 Coût Revu Préfér Coût Estima Métho Pré e Date Etape/ ence Estim tif de qualifi Banq prévue Date fin Nation Réf Description atif (USD) passati cation ue ouvertu des ale (USD) TTC on du (oui/no (Prior re prestati (oui/no HTVA marché n) i/ offres ons n) Post) Recrutement d’un consultant (firme) pour la réalisation des EIES et PAR des sous 166,66 198,75 22/06/1 1 projets de 7 0 QC non non post N/A proximité dans 7 les villes de Yaoundé, Douala, Batouri, Kumba et Ngaoundéré Recrutement d’un consultant formateur dans le cadre de 11,666 13,912 30/04/1 2 l’atelier CI non non post N/A itinérant sur la 7 note méthodologiqu e CCE dans les 5 villes Recrutement de l’évaluateur externe pour la mise en œuvre 31/12/1 3 des PAR dans 7,000 8,347 CI non non post N/A les villes de 7 Yaoundé, Douala, Batouri, 5 Kumba et Ngaoundéré. Recrutement d’un consultant (firme) pour la réalisation des études APS/APD/DAO 142,0 169,43 22/12/1 4 QC non non post N/A de travaux 83 4 7 d'Aménageme nt de proximité dans les villes de Batouri, Kumba, et Ngaoundéré Recrutement d’un consultant (firme) pour la réalisation des études 139,3 166,15 22/12/1 5 QC non non post N/A APS/APD/DAO 33 5 7 de travaux d'Aménageme nt de proximité dans la ville de Douala Recrutement d’un consultant (firme) pour la réalisation des études 137,5 163,96 22/12/1 6 QC non non post N/A APS/APD/DAO 00 9 7 de travaux d'Aménageme nt de proximité dans la ville de Yaoundé Recrutement d’un consultant (firme) pour la réalisation des études APS/APD/DAO 21/12/1 7 de travaux 70,00 QC non non post N/A pilotes pour la 83,500 7 0 mobilité piétonne dans certains quartiers de la ville de Yaoundé 6 Gestion du Projet Avenant au contrat du 8 49,603 59,151 SED Non Non Priori 30/09/17 Coordonnate N/A ur du PDVI Avenant au contrat du Responsable 9 16,931 20,190 CI Non Non Priori N/A 30/09/17 Administratif et Financier du PDVI Avenant au contrat du 10 15,873 18,929 SED Non Non Priori N/A 30/09/17 Comptable du PDVI Avenant au Contrat du Responsable 11 environnem 15,873 18,929 SED Non Non Priori N/A 30/09/17 ental et social du PDVI Recrutemen t d’un Spécialiste en 12 22,500 26,831 CI Non Non Priori N/A 31/12/19 développem ent social au sein de la CP/PDVI Recrutemen Activité t d‘un de consultant passatio (firme) - n des marchés chargé de menée l’audit 13 33,334 39,750 SFQC Non Non Priori par le comptable MINEPAT et financier du PDVI, exercices 2016 et 2017 Avenant au Contrat de l’Assistant 14 7,937 9,464 SED Non Non Post N/A 30/09/17 Administratif et financier du PDVI Avenant au contrat de FCP 15 4,762 5,679 SED Non Non Post N/A l’Assistante 30/09/17 du 7 coordonnate ur Avenant au FCP Contrat de 31/12/17 16 l’Assistant 10,582 12,619 SED Non Non Post N/A Avenant de Passation signé des Marchés Avenant au FCP contrat de 31/12/17 17 2,540 3,029 SED Non Non Post N/A l’Agent Avenant administratif signé Total 924,104 1, 101 994 NB :Le taux du dollar (USD) appliqué est de 1USD= 600 F CFA. Le Taux de conversion du dollar (USD) utilisé est le Cours du dollar à la date de financement des fonds de préparation du Projet(PPA) SFQC : Sélection fondée sur la Qualité et le Coût DC/CF : Demande de Cotations/ Consultation Fournisseurs SMC : Sélection fondée sur le Moindre Coût CI : Consultant Individuel QC : Sélection basée sur les qualifications des Consultants SED/ED: Sélection par Entente Directe / Entente Directe SCBD : Sélection dans le Cadre d’un Budget Déterminé Post : Revue à postériori Priori : Revue à priori MINHDU : Ministère de l’Habitat et du Développement Urbain CP : Cellule de Préparation du Projet PPM: Plan de Passation des Marchés FCP : Fonds de contrepartie 8 PROCUREMENT Cameroon : Cameroon: Inclusive and Resilient Cities Development Project PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan: 2017-04-10 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156210 GPN Date: 2019-08-05 Project Name: Cameroon: Inclusive and Resilient Cities Development Project Loan / Credit No: IDA / V0100, IDA / 61320 M Executing Agency(ies): INISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CM-MINHDU-91226-CW-RFB Improving Connectivity and / Réalisation des travaux de Single Stage - One 2,506,561.2 2021-09- IDA / 61320 Living environment in Post Request for Bids Open - National 1,958,297.00 Signed 2020-01-20 2020-03-19 2020-02-19 2020-04-03 2020-04-29 2020-05-03 2020-08-12 2020-06-07 2020-10-07 voiries structurantes dans la Envelope 8 30 Beneficiary Cities ville de Batouri CM-MINHDU-91158-CW-RFB / Réalisation des travaux de Improving Connectivity and Under Single Stage - One 27,090,022.0 15,579,588. 2022-07- voiries structurantes dans la IDA / 61320 Living environment in Prior Request for Bids Open - International Implementat 2019-12-15 2020-03-10 2020-01-26 2020-03-31 2020-04-25 2020-05-26 2020-06-06 2021-06-04 2020-07-11 Envelope 0 70 31 ville de Yaoundé CAY5 et Beneficiary Cities ion CAY7 CM-MINHDU-91198-CW-RFB / Réalisation des travaux de Improving Connectivity and Single Stage - One 16,746,128.0 10,761,781. 2022-08- voiries structurantes dans les IDA / 61320 Living environment in Prior Request for Bids Open - International Signed 2020-01-15 2020-03-04 2020-02-26 2020-03-30 2020-05-26 2020-05-28 2020-07-07 2021-02-16 2020-08-11 2021-04-15 Envelope 0 72 31 Arrondissements de Douala Beneficiary Cities 3e et 5e CM-MINHDU-91349-CW-RFB / réalisation des travaux de Improving Connectivity and Single Stage - One 2022-12- plantation d'arbres dans les IDA / 61320 Living environment in Post Request for Bids Open - National 490,462.00 0.00 Canceled 2020-05-19 2020-06-12 2020-07-17 2020-08-16 2020-09-20 Envelope 09 arrondissements de Douala 3e Beneficiary Cities et 5e CM-MINHDU-91218-CW-RFB Improving Connectivity and / Réalisation des travaux de Single Stage - One 2022-10- IDA / 61320 Living environment in Post Request for Bids Open - National 6,557,298.00 0.00 Canceled 2020-06-15 2020-07-06 2020-08-17 2020-09-16 2020-10-21 voiries structurantes dans la Envelope 11 Beneficiary Cities ville de Kumba CM-MINHDU-91344-CW-RFB / Réalisation des travaux Improving Connectivity and d'ouvrages de drainage Single Stage - One 21,638,050.0 14,416,042. 2022-08- IDA / 61320 Living environment in Prior Request for Bids Open - International Signed 2020-01-15 2020-03-04 2020-02-26 2020-05-12 2020-05-26 2020-05-26 2020-07-07 2021-02-23 2020-08-11 2021-04-15 structurants dans les Envelope 0 38 31 Beneficiary Cities arrondissements de Douala 3e et 5e CM-MINHDU-91229-CW-RFB Improving Connectivity and / Réalisation des travaux de Single Stage - One 2022-05- IDA / 61320 Living environment in Prior Request for Bids Open - National 8,217,373.00 0.00 Canceled 2019-12-25 2020-02-05 2020-03-18 2020-04-29 2020-06-03 voiries structurantes dans la Envelope 24 Beneficiary Cities ville de Ngaoundéré CM-MINHDU-168199-CW- RFB / Réalisation des travaux Improving Connectivity and Single Stage - One 6,895,762.6 2022-02- de voiries structurantes dans IDA / 61320 Living environment in Prior Request for Bids Open - International 8,217,373.00 Signed 2020-05-15 2020-04-24 2020-05-20 2020-04-24 2020-07-01 2020-06-11 2020-07-31 2020-11-02 2020-09-04 2020-12-21 Envelope 3 26 la ville de Ngaoundéré– Beneficiary Cities Cameroun CM-MINHDU-169945-CW- RFQ / Travaux de cloisement Project Management, Request for Single Stage - One 2020-11- des espaces pour créer des IDA / 61320 Coordination, Monitoring and Post Limited 8,393.00 7,511.75 Completed 2020-08-25 2020-07-07 2020-10-20 2020-09-14 Quotations Envelope 19 bureaux à la Cellule de Evaluation Coordination du projet CM-MINHDU-212924-NC- RFQ / Petit travaux Project Management, d'installation du groupe Request for Single Stage - One 2021-04- IDA / 61320 Coordination, Monitoring and Post Limited 6,860.00 6,977.65 Signed 2021-03-06 2021-02-05 2021-04-03 2021-03-12 électrogène SDMO 16KVA Quotations Envelope 13 Evaluation avec inverseur automatique au PDVIR CM-MINHDU-233545-CW- RFB / Travaux de voiries Improving Connectivity and Request for Bids - Pending structurantes dans Single Stage - One 2023-04- IDA / 61320 Living environment in Post Request for Bids Open - National Works French Civil 6,910,337.00 0.00 Implementat 2021-06-15 2021-07-15 2021-08-26 2021-09-25 2021-11-06 l’Arrondissement de Douala Envelope 30 Beneficiary Cities Law (French) SPD ion 5ème, Cameroun : Tronçon : PK 11-Fin goudron Logpom GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11636-GO-RFQ Project Management, Request for Single Stage - One / Fourniture de mobilier pour IDA / V0100 Coordination, Monitoring and Post Limited 54,656.00 0.00 Canceled 2017-06-11 2017-07-20 2017-08-03 Quotations Envelope la CP/PDVI Evaluation CM-MINHDU-91885-GO-RFB Strengthening Capacity for / Acquisition de logiciels pour Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 250,000.00 0.00 Canceled 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2020-01-20 la programmation de Envelope Management l'entretien des VRD et drains CM-MINHDU-91875-GO-RFQ / Acquisition du matériel pour Strengthening Capacity for Request for Single Stage - One la mise en place d'une gestion IDA / 61320 Inclusive and Resilient Urban Post Open - National 83,334.00 0.00 Canceled 2019-09-04 2019-10-30 2019-12-29 Quotations Envelope informatisée des opérations Management d'investissement à la DOU CM-MINHDU-91851-GO-RFB / Achat des équipements pour Strengthening Capacity for Single Stage - One le centre de formation des IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 210,000.00 0.00 Canceled 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2019-12-21 Envelope jeunes aux travaux urbains à Management Kumba et Ngaoundére Page 1 CM-MINHDU-125030-GO- RFB / Acquisition des Project Management, matériels informatiques et de Single Stage - One IDA / 61320 Coordination, Monitoring and Post Request for Bids Open - National 128,468.00 0.00 Canceled 2019-08-30 2019-09-04 2019-10-04 2019-11-03 2019-12-08 2020-01-07 bureau pour la Cellule de Envelope Evaluation Coordination et les UTL du PDVIR CM-MINHDU-144044-GO- RFQ / Fourniture du matériel Project Management, de bureau, des produits de Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 8,393.00 41,873.01 Signed 2019-12-10 2020-09-14 2020-02-04 2020-10-09 2020-03-05 réception et d’entretien à la Quotations Envelope Evaluation Cellule de Coordination du PDVIR CM-MINHDU-91924-GO-RFQ Project Management, Request for Single Stage - One / Acquisition de matériel IDA / 61320 Coordination, Monitoring and Post Open - National 41,661.00 0.00 Canceled 2019-12-07 2020-02-01 2020-04-01 Quotations Envelope informatique pour les UTL Evaluation CM-MINHDU-139715-GO- RFQ / Acquisition du matériel Project Management, Request for Single Stage - One et équipement informatique à IDA / 61320 Coordination, Monitoring and Post Limited 59,952.00 0.00 Canceled 2019-12-25 2020-02-19 2020-03-20 Quotations Envelope la Cellule de Coordination du Evaluation PDVIR CM-MINHDU-91926-GO-RFQ Project Management, / Achat de 05 véhicules Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 214,113.00 0.00 Canceled 2019-12-07 2020-02-01 2020-05-31 pickup double cabine Quotations Envelope Evaluation respectivement pour les UTL CM-MINHDU-91929-GO-RFQ Project Management, / Fourniture de bureau et Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Open - National 8,393.00 0.00 Canceled 2019-12-07 2020-02-01 2020-03-02 consommable informatique à Quotations Envelope Evaluation la CC/PDVIR CM-MINHDU-169961-GO- Project Management, RFQ / Acquisition du petit Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 6,851.00 3,863.70 Completed 2020-05-20 2020-07-07 2020-07-15 2020-09-14 2020-08-14 2020-11-27 matériel de lutte contre le Quotations Envelope Evaluation COVID 19. CM-MINHDU-144105-GO- RFB / Acquisition d'un (01) véhicule 4X4 station Wagon Project Management, Single Stage - One pour la Cellule de IDA / 61320 Coordination, Monitoring and Post Request for Bids Open - National 299,759.00 310,893.09 Signed 2020-05-30 2020-10-12 2020-06-04 2020-10-15 2020-07-16 2020-11-12 2020-08-15 2020-12-09 2020-09-19 2021-01-18 2020-11-18 Envelope Coordination du PDVIR et de Evaluation cinq (05) véhicules pickup double cabine pour les UTL. CM-MINHDU-91853-GO-RFB / Fourniture d'un drone Strengthening Capacity for Under professionnelle et d'une Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - International 208,334.00 0.00 Implementati 2020-08-20 2020-12-16 2020-08-25 2020-12-16 2020-10-24 2021-01-21 2020-11-23 2020-12-28 2021-02-26 plateforme Envelope Management on photogrammétrique au MINDCAF CM-MINHDU-91887-GO-RFQ Project Management, / Fourniture et pose des Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Open - National 70,808.00 0.00 Canceled 2020-05-20 2020-07-15 2021-07-15 babillards dans les CTD de Quotations Envelope Evaluation ressort du Projet CM-MINHDU-91862-GO-RFB / Acquisition de GPS bi- Strengthening Capacity for Under fréquence au profit de trois Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 125,000.00 0.00 Implementati 2020-06-15 2020-12-10 2020-06-20 2020-12-16 2020-08-01 2021-01-21 2020-08-31 2020-10-05 2020-12-04 délégations départementales Envelope Management on du MINDCAF( N'Gaoundéré, Kumba et Batouri) CM-MINHDU-144110-GO- RFQ / Fourniture et pose des Project Management, Under babillards dans les Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 70,808.00 0.00 Implementati 2020-10-05 2020-11-30 2020-12-30 Collectivités Territoriales Quotations Envelope Evaluation on Décentralisées (CTD) de ressort du projet. CM-MINHDU-169970-GO- Project Management, RFQ / Acquisition fournitures Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 42,000.00 3,520.43 Signed 2020-08-04 2020-09-14 2020-09-29 2020-10-09 2021-09-24 de Bureau, d'entretien et de Quotations Envelope Evaluation pose café CM-MINHDU-169989-GO- RFQ / Acquisition mobilier de Project Management, Request for Single Stage - One bureau pour le nouveau IDA / 61320 Coordination, Monitoring and Post Limited 13,700.00 13,585.38 Signed 2020-09-20 2020-09-14 2020-11-15 2020-10-13 2020-12-15 Quotations Envelope personnel (personnel clé et Evaluation d'appui) CM-MINHDU-169984-GO- RFQ / Acquisition des Project Management, Under consommable informatiques Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 68,000.00 0.00 Implementati 2020-08-30 2020-10-11 2021-10-06 pour la Cellule de Quotations Envelope Evaluation on Coordination du PDVIR et les UTL CM-MINHDU-196965-GO- Project Management, RFQ / Fourniture du mobilier Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 32,550.00 33,527.10 Signed 2020-11-25 2020-12-28 2021-01-13 2021-02-26 2021-02-12 de bureau au profit des UTL Quotations Envelope Evaluation dans le cadre du PDVIR CM-MINHDU-144060-GO- RFQ / Acquisition du matériel informatique pour la Cellule de Coordination (CC), les Strengthening Capacity for Single Stage - One Unités Techniques de Liaison IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 214,113.00 0.00 Canceled 2020-08-30 2020-08-13 2020-08-31 2020-10-12 2020-09-30 2020-11-11 2020-12-16 2021-01-15 Envelope (UTL) et les Collectivités Management Territoriales Décentralisées (CTD) ou mairies concernées par le projet. Page 2 CM-MINHDU-197279-GO- RFB / Fourniture et installation du matériel informatique à la Cellule de coordination, aux Unités Strengthening Capacity for Under Single Stage - One Techniques de Liaison (UTL) et IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 393,000.00 0.00 Implementati 2020-11-30 2020-12-14 2020-12-05 2020-12-16 2021-01-04 2021-01-22 2021-01-19 2021-02-02 2021-02-16 2021-03-18 Envelope aux collectivités territoriales Management on décentralisées (CTD) du projet de développement des villes inclusives et résilientes ( quatre lots) CM-MINHDU-179225-GO- DIR / Fourniture de matériels Strengthening Capacity for de lutte contre le Covid-19 IDA / 61320 Inclusive and Resilient Urban Post Direct Selection Direct 215,826.00 0.00 Canceled 2020-07-30 2020-08-04 2020-09-08 2020-11-07 dans toutes les villes du Management projet. CM-MINHDU-196921-GO- RFQ / Production et édition des supports de communication pour la Strengthening Capacity for CCP/PDVIR et les UTL Request for Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Limited 25,693.00 0.00 Canceled 2020-12-12 2021-01-09 2021-01-30 (Agendas, stylos personnalisé, Quotations Envelope Management casquettes, polos, carte de visite, plaquette mural, calendriers, auto collants sur les véhicules CM-MINHDU-223169-GO- RFQ / Achat du nouveau Project Management, Pending Request for Single Stage - One matériel contre la COVID-19 IDA / 61320 Coordination, Monitoring and Post Limited 3,430.00 0.00 Implementati 2021-04-10 2021-05-22 2021-06-21 Quotations Envelope pour la Cellule de Evaluation on Coordination du Projet CM-MINHDU-226972-GO- RFQ / Souscription d’une police d’assurance annuelle pour les sept nouveaux Project Management, Pending véhicules de la Cellule de Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 27,444.00 0.00 Implementati 2021-05-15 2021-07-05 2021-07-19 Coordination du Projet de Quotations Envelope Evaluation on Développement des Villes Inclusives et Résilientes (PDVIR) et des Unités Techniques de Liaison (UTL) CM-MINHDU-91891-NC-RFQ / Production et édition des supports de communication destinés à améliorer la Project Management, Pending visibilité du projet au plan Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Open - National 42,881.00 0.00 Implementati 2021-08-04 2021-10-14 2022-10-09 national comme au niveau Quotations Envelope Evaluation on local (roll up, flyers, porte- document, plaquettes, agendas, calendriers, gadgets, magazine, etc.) pour un an. CM-MINHDU-226967-GO- RFQ / Acquisition des outils de communication : Téléphones portables et Project Management, Pending Request for Single Stage - One Modem internet au profit du IDA / 61320 Coordination, Monitoring and Post Limited 18,765.00 0.00 Implementati 2021-08-04 2021-09-22 2021-10-06 Quotations Envelope personnel de la Cellule de Evaluation on Coordination du PDVIR (CCP) et des Unités Techniques de Liaison (UTL) CM-MINHDU-221645-GO- RFQ / Acquisition du matériel Project Management, Pending Request for Single Stage - One pour la tenue des visio IDA / 61320 Coordination, Monitoring and Post Limited 6,861.00 0.00 Implementati 2021-04-10 2021-06-05 2021-06-20 Quotations Envelope conférences de groupe Evaluation on (micro,camera, ecran ect...) CM-MINHDU-212718-GO- RFB / Fourniture du matériel d'hygiène et de salubrité au profit des comités de Strengthening Capacity for Pending Développement des Quartiers Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 137,221.00 0.00 Implementati 2021-04-15 2021-04-20 2021-06-01 2021-07-01 2021-08-05 2021-10-04 (CDQ) et autres associations Envelope Management on dans les communes ( CUY5 et 7, CUD 3 et 5, CAM et CAM 1, CUN, CAN2, KO, Ba) dans le cadre du PDVIR NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11327-NC-DIR / Acquisition d'un logiciel Project Management, comptable et suivi-évaluation IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 43,725.00 34,496.28 Signed 2017-01-10 2016-06-17 2017-01-17 2016-09-07 2017-02-21 2017-06-19 2023-02-21 (TOM2PRO/TOM2MONITORIN Evaluation G) y compris la formation et l’assistance technique CM-MINHDU-11332-NC-DIR Project Management, / Marché à commande pour la IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 33,300.00 0.00 Canceled 2017-03-31 2017-04-05 2017-05-10 2018-05-10 maintenance des véhicules du Evaluation Projet pour une durée d'un an CM-MINHDU-11326-NC-DIR / Renouvellement Contrat annuel de gardiennage des Project Management, biens et locaux de la Cellule IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 8,587.00 0.00 Canceled 2017-05-15 2017-05-21 2017-06-28 2018-06-28 de Préparation du Projet de Evaluation Développement des villes Inclusives (PDVI) CM-MINHDU-11329-NC-DIR / Renouvellement du contrat annuel de la Couverture Project Management, médicale du personnel de la IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,725.00 0.00 Canceled 2017-04-18 2017-04-23 2017-05-18 2018-05-18 Cellule de Préparation du Evaluation Projet de Développement des villes Inclusives (PDVI) Page 3 CM-MINHDU-17089-NC-RFQ Project Management, / Marché à commande pour la Request for Single Stage - One IDA / V0100 Coordination, Monitoring and Post Limited 33,330.00 0.00 Canceled 2017-06-19 2017-08-05 2018-08-05 maintenance des véhicules du Quotations Envelope Evaluation Projet pour une durée d'un an CM-MINHDU-17127-NC-RFQ / Contrat annuel de gardiennage des biens et Project Management, Request for Single Stage - One locaux de la Cellule de IDA / V0100 Coordination, Monitoring and Post Limited 8,587.00 0.00 Canceled 2017-06-19 2017-08-14 2018-08-14 Quotations Envelope Préparation du Projet de Evaluation Développement des villes Inclusives (PDVI) CM-MINHDU-17129-NC-RFQ / Contrat annuel de la Couverture médicale du Project Management, Request for Single Stage - One personnel de la Cellule de IDA / V0100 Coordination, Monitoring and Post Limited 43,725.00 0.00 Canceled 2017-06-19 2017-08-14 2018-08-14 Quotations Envelope Préparation du Projet de Evaluation Développement des villes Inclusives (PDVI) CM-MINHDU-27490-NC-RFQ Project Management, Request for Single Stage - One / Maintenance du matériel IDA / 61320 Coordination, Monitoring and Post Limited 5,000.00 0.00 Canceled 2017-10-02 2017-11-06 2018-11-01 Quotations Envelope informatique du PDVIR Evaluation CM-MINHDU-111114-NC- Project Management, RFQ / Prestation de services Request for Single Stage - One IDA / V0100 Coordination, Monitoring and Post Limited 27,926.00 0.00 Canceled 2019-09-27 2019-11-22 2020-11-21 pour la maintenance des Quotations Envelope Evaluation véhicules du Projet CM-MINHDU-91913-NC-RFQ Project Management, Request for Single Stage - One / Couverture médicale du IDA / 61320 Coordination, Monitoring and Post Limited 34,258.00 25,938.79 Signed 2019-12-22 2020-03-02 2020-02-16 2020-04-30 2021-02-15 Quotations Envelope personnel de la CC/ PDVIR Evaluation CM-MINHDU-144285-NC- Project Management, RFQ / Service de gardiennage Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Open - National 8,221.00 17,040.38 Signed 2020-01-25 2020-03-21 2020-04-30 2021-03-16 à la Cellule de Coordination Quotations Envelope Evaluation du PDVIR CM-MINHDU-144284-NC- Project Management, Request for Single Stage - One RFQ / Maintenance de cinq IDA / 61320 Coordination, Monitoring and Post Limited 34,258.00 23,167.07 Signed 2020-01-25 2020-04-09 2020-03-21 2020-07-20 2021-03-16 Quotations Envelope (05) véhicules du Projet. Evaluation CM-MINHDU-169948-NC- RFQ / Reprographie externe Project Management, Request for Single Stage - One des documents très IDA / 61320 Coordination, Monitoring and Post Limited 8,393.00 8,792.18 Signed 2020-05-30 2020-07-06 2020-07-25 2020-09-22 2021-07-20 Quotations Envelope volumineux (DAO, plans etc..) Evaluation (accord cadre renouvelable) CM-MINHDU-169953-NC- Project Management, RFQ / Fourniture connexion Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 7,194.00 7,511.75 Signed 2020-06-27 2020-06-15 2020-08-22 2020-09-14 2021-08-17 internet haut débit à la cellule Quotations Envelope Evaluation de Coordination du Projet CM-MINHDU-156983-NC- Project Management, Under RFQ / Assurance des Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 8,564.00 0.00 Implementati 2020-03-01 2020-04-26 2020-05-26 véhicules de la Cellule de Quotations Envelope Evaluation on Coordination du projet CM-MINHDU-169951-NC- Project Management, Request for Single Stage - One RFQ / Entretien et réparation IDA / 61320 Coordination, Monitoring and Post Limited 8,000.00 4,449.98 Signed 2020-08-15 2020-09-25 2020-10-10 2020-12-16 2021-10-05 Quotations Envelope des copieurs Evaluation CM-MINHDU-144808-NC- Project Management, Request for Single Stage - One RFQ / Maintenance du IDA / 61320 Coordination, Monitoring and Post Limited 8,000.00 4,302.91 Signed 2019-12-22 2020-01-03 2020-02-16 2020-01-20 2021-02-10 Quotations Envelope matériel informatique. Evaluation CM-MINHDU-221664-NC- Project Management, Pending RFQ / Police d'assurance du Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 64,198.00 0.00 Implementati 2021-05-05 2021-06-30 2022-06-25 personnel de la CCP et des Quotations Envelope Evaluation on UTL CM-MINHDU-212920-NC- RFQ / Fourniture de services Project Management, Pending de maintenance préventive et Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 4,112.00 0.00 Implementati 2021-01-25 2021-03-01 2022-02-24 curative des réseaux Quotations Envelope Evaluation on électriques et de climatisation des locaux du PDVIR CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11686-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Improving Connectivity and Consultant études APS/APD/DAO de IDA / V0100 Living environment in Post Qualification Open - National 163,969.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 travaux d'Aménagement de Beneficiary Cities Selection proximité dans la ville de Yaoundé CM-MINHDU-11647-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Project Management, Consultant EIES et PAR des sous projets IDA / V0100 Coordination, Monitoring and Post Qualification Open - National 198,750.00 0.00 Canceled 2017-05-15 2017-06-05 2017-07-05 2017-07-15 2017-08-04 2017-11-02 de proximité dans les villes de Evaluation Selection Yaoundé, Douala, Batouri, Kumba et Ngaoundéré CM-MINHDU-11677-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Improving Connectivity and Consultant études APS/APD/DAO de IDA / V0100 Living environment in Post Qualification Open - National 169,434.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 travaux d'Aménagement de Beneficiary Cities Selection proximité dans les villes de Batouri, Kumba, et Ngaoundéré Page 4 CM-MINHDU-11689-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Improving Connectivity and Consultant études APS/APD/DAO de IDA / V0100 Living environment in Post Qualification Open - National 83,500.00 0.00 Canceled 2017-05-01 2017-05-22 2017-06-21 2017-07-01 2017-07-21 2018-01-17 travaux pilotes pour la Beneficiary Cities Selection mobilité piétonne dans certains quartiers de la ville de Yaoundé CM-MINHDU-11682-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Improving Connectivity and Consultant études APS/APD/DAO de IDA / V0100 Living environment in Post Qualification Open - National 166,155.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 travaux d'Aménagement de Beneficiary Cities Selection proximité dans la ville de Douala CM-MINHDU-11762-CS- QCBS / Recrutement d'un Project Management, consultant (firme) chargé de Quality And Cost- IDA / V0100 Coordination, Monitoring and Prior Open - National 39,750.00 0.00 Canceled 2017-04-16 2017-05-07 2017-06-20 2017-07-18 2017-08-17 2017-09-21 2017-10-26 2018-10-26 l'audit comptable et financier Based Selection Evaluation du PDVI, exercices 2016 et 2017 CM-MINHDU-91365-CS- QCBS / Contrôle et surveillance pour la réalisation Improving Connectivity and des travaux de voiries et Quality And Cost- IDA / 61320 Living environment in Prior Open - International 1,790,321.00 1,624,270.75 Signed 2019-01-26 2019-11-15 2019-02-23 2019-12-13 2019-05-06 2020-04-24 2019-06-05 2020-06-03 2019-07-17 2020-09-24 2019-09-11 2020-12-22 2019-10-16 2021-02-04 2022-01-03 ouvrages de drainage Based Selection Beneficiary Cities structurants dans les arrondissements de Douala 3e et 5e CM-MINHDU-91367-CS- QCBS / Contrôle et Improving Connectivity and surveillance pour la réalisation Quality And Cost- IDA / 61320 Living environment in Post Open - National 140,116.00 106,549.83 Signed 2020-02-20 2019-06-04 2020-03-19 2020-05-30 2020-01-30 2020-06-29 2020-05-13 2020-08-10 2020-06-02 2020-10-05 2020-08-24 2020-11-09 2020-10-07 2022-03-04 des travaux de voiries Based Selection Beneficiary Cities structurants dans la ville de Batouri CM-MINHDU-91433-CS- QCBS / Maitrise d'œuvre Improving Connectivity and complète pour la réalisation Quality And Cost- Under IDA / 61320 Living environment in Post Open - International 622,817.00 0.00 2019-05-14 2020-05-26 2019-06-11 2020-06-10 2019-08-22 2021-05-04 2019-09-21 2019-11-02 2019-12-28 2020-02-01 2022-03-22 des travaux de voiries et Based Selection Implementation Beneficiary Cities d'équipements de proximité de Douala 3e et 5e CM-MINHDU-91375-CS- QCBS / Contrôle et Improving Connectivity and surveillance pour la réalisation Quality And Cost- IDA / 61320 Living environment in Post Open - National 587,953.00 0.00 Canceled 2019-02-19 2019-03-19 2019-05-30 2019-06-29 2019-08-10 2019-10-05 2019-11-09 2021-11-28 des travaux de voiries Based Selection Beneficiary Cities structurants dans la ville de Ngaoundere CM-MINHDU-122434-CS- CQS / Etudes techniques (APS/APD), et production de Dossier d’Appel d’Offres(DAO) Improving Connectivity and Consultant en vue de la réalisation de IDA / V0100 Living environment in Post Qualification Open - National 160,000.00 148,746.20 Signed 2016-02-15 2016-02-15 2016-03-07 2016-04-20 2016-04-07 2016-05-20 2016-04-20 2016-06-24 2016-05-31 2016-12-21 travaux de voiries et ouvrages Beneficiary Cities Selection de drainage structurants dans les arrondissements de Douala 3ème et 5ème . CM-MINHDU-122432-CS- Strengthening Capacity for Consultant CQS / Appui à la préparation IDA / V0100 Inclusive and Resilient Urban Post Qualification Open - National 170,000.00 119,006.34 Signed 2016-07-28 2016-03-16 2016-08-18 2016-10-01 2016-05-09 2016-10-31 2016-09-20 2016-12-05 2016-12-09 2017-06-03 des contrats de ville de Management Selection Ngaoundéré et Batouri. CM-MINHDU-122442-CS- CQS / Appui à la préparation Strengthening Capacity for Consultant des contrats de ville des IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 190,000.00 148,376.65 Signed 2016-07-27 2016-08-08 2016-08-17 2016-09-30 2016-05-09 2016-10-30 2016-09-30 2016-12-04 2016-11-28 2017-06-02 communes d’arrondissements Management Selection de Yaoundé 5, 7, Douala 3 et Douala 5. CM-MINHDU-122439-CS- Strengthening Capacity for Consultant CQS / Appui à la préparation IDA / V0100 Inclusive and Resilient Urban Post Qualification Open - National 150,000.00 92,114.65 Signed 2016-07-27 2016-03-23 2016-08-17 2016-09-30 2016-05-09 2016-10-30 2016-10-13 2016-12-04 2016-12-09 2017-06-02 du contrat de ville de Kumba Management Selection CM-MINHDU-122440-CS- CQS / Etudes techniques (APS/APD), et production de Dossier d’Appel d’Offres(DAO) Improving Connectivity and Consultant en vue de la réalisation de IDA / V0100 Living environment in Post Qualification Open - National 155,000.00 144,470.34 Signed 2016-02-15 2016-03-07 2016-03-07 2016-04-20 2016-03-28 2016-05-20 2016-05-03 2016-06-24 2016-05-31 2016-12-21 travaux de voiries et Beneficiary Cities Selection équipements structurants dans les villes de Kumba, Batouri et Ngaoundéré CM-MINHDU-122443-CS- CQS / Etudes techniques (APS/APD), et production de Improving Connectivity and Consultant Dossier d’Appel d’Offres(DAO) IDA / V0100 Living environment in Post Qualification Open - National 150,000.00 135,517.80 Signed 2016-02-15 2016-02-15 2016-03-07 2016-04-20 2016-04-13 2016-05-20 2016-05-23 2016-06-24 2016-07-12 2016-12-21 en vue de la réalisation de Beneficiary Cities Selection travaux de voiries structurants dans les arrondissements de Yaoundé 5ème et 7ème. CM-MINHDU-123791-CS- CQS / Sélection d’un Project Management, Consultant Consultant Firme pour IDA / V0100 Coordination, Monitoring and Post Qualification Open - National 18,000.00 18,503.23 Signed 2016-03-20 2016-02-02 2016-04-10 2016-05-24 2016-04-04 2016-06-23 2016-06-30 2016-07-28 2016-07-27 2017-01-24 l’élaboration du Cadre de Evaluation Selection Politique de Recasement du PDVI. CM-MINHDU-91524-CS-CQS / Elaboration des plans de Strengthening Capacity for Consultant secteur et enquêtes IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 250,000.00 0.00 Canceled 2019-08-30 2019-09-27 2019-11-22 2019-12-27 2020-01-24 2020-10-20 parcellaires dans les zones Management Selection cibles de N'Gaoundéré, Kumba et Batouri Page 5 CM-MINHDU-118420-CS- QCBS / Contrôle et Project Management, surveillance pour la réalisation Quality And Cost- IDA / 61320 Coordination, Monitoring and Prior Open - National 587,953.00 591,949.14 Signed 2020-01-15 2019-11-15 2020-01-16 2019-12-06 2020-02-29 2020-04-02 2020-03-28 2020-05-28 2020-04-27 2020-09-03 2020-06-01 2020-11-19 2020-07-06 2020-12-08 2022-06-26 des travaux de voiries Based Selection Evaluation structurantes dans la ville de Ngaoundéré CM-MINHDU-91528-CS- QCBS / Développement d'un outil de programmation et de gestion de l'entretien des VRD en 02 missions séparées: Strengthening Capacity for Quality And Cost- Mission 01- Développement IDA / 61320 Inclusive and Resilient Urban Prior Open - International 1,000,000.00 0.00 Canceled 2019-11-03 2019-12-01 2020-02-09 2020-03-10 2020-05-05 2020-07-02 2020-07-30 2021-04-26 Based Selection d'un outil de programmation Management et de gestion de l'entretien des VRD à Yaoundé, Mission 02-Développement d'un outil etc CM-MINHDU-94779-CS- QCBS / Mairies d'œuvre Improving Connectivity and complète pour la réalisation Quality And Cost- IDA / 61320 Living environment in Post Open - National 388,764.00 0.00 Canceled 2019-05-14 2019-06-11 2019-08-22 2019-09-21 2019-11-02 2019-12-28 2020-02-01 2022-03-22 des travaux de voiries et Based Selection Beneficiary Cities d'équipements de proximité dans la ville de Maroua CM-MINHDU-91547-CS-CQS / Etude stratégique sur la Strengthening Capacity for Consultant programmation et la gestion IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - International 250,000.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2022-02-13 des investissements du Management Selection MINHDU financés par le BIP CM-MINHDU-91538-CS- QCBS / Appui à l'actualisation Strengthening Capacity for Quality And Cost- de l'adressage et à la mise en IDA / 61320 Inclusive and Resilient Urban Post Open - International 250,000.00 0.00 Canceled 2020-01-02 2020-01-30 2020-03-26 2020-04-25 2020-06-06 2020-07-20 2020-08-17 2021-02-13 Based Selection place d'un applicatif fiscal à Management Yaoundé CM-MINHDU-91542-CS- QCBS / Inventaire pour la Strengthening Capacity for programmation des Quality And Cost- IDA / 61320 Inclusive and Resilient Urban Prior Open - International 433,334.00 0.00 Canceled 2020-01-02 2020-01-30 2020-04-09 2020-05-09 2020-07-04 2020-08-31 2020-09-28 2021-03-27 équipements marchands à Based Selection Management Yaoundé, Kumba, et Ngaoundére CM-MINHDU-91536-CS-CQS / Valorisation de l'étude "état des lieux des équipements Strengthening Capacity for Consultant marchands" dans l'objectif IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 166,666.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2020-08-22 d'une programmation Management Selection raisonnée des interventions et des améliorations de gestion à Douala CM-MINHDU-91560-CS-CQS / Etude sur les méthodes Strengthening Capacity for Consultant d'aménagement concerté en IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 166,666.00 0.00 Canceled 2019-10-03 2019-10-31 2019-12-26 2020-01-30 2020-02-27 2020-11-23 zone urbaine dense et dans Management Selection les zones d'extension urbaine CM-MINHDU-91520-CS- QCBS / Elaboration du plan de Strengthening Capacity for Quality And Cost- secteur dans les Communes IDA / 61320 Inclusive and Resilient Urban Post Open - National 400,000.00 0.00 Canceled 2020-09-30 2020-11-21 2020-10-28 2020-12-23 2021-01-22 2021-03-05 2021-04-18 2021-05-16 2022-02-10 Based Selection d'Arrondissement de Yaoundé Management 5ème et 7ème CM-MINHDU-91491-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant pour la réalisation des travaux IDA / 61320 Living environment in Post Qualification Open - National 155,351.00 0.00 Canceled 2019-07-17 2019-08-14 2019-09-27 2019-11-08 2019-12-13 2022-04-01 de voiries et d'équipements Beneficiary Cities Selection de proximité de Kumba CM-MINHDU-91533-CS-CQS / Evaluation de l'opération fichiers des contribuables Strengthening Capacity for Consultant réalisée par le PDUE dans les IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - International 166,666.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2020-08-22 6 Communes Management Selection d'Arrondissement de Douala et développement d'un applicatif fiscal de l'adressage CM-MINHDU-91511-CS- QCBS / Elaboration des plans de secteur en 03 missions séparées: Mission 01- Elaboration du plan de secteur Strengthening Capacity for Quality And Cost- dans les Communes IDA / 61320 Inclusive and Resilient Urban Prior Open - International 783,334.00 0.00 Canceled 2019-08-30 2019-09-27 2019-12-06 2020-01-05 2020-03-01 2020-04-28 2020-05-26 2021-02-20 Based Selection d'Arrondissement de Douala Management 3ème et 5ème Mission 02- Elaboration du plan de secteur autour de l'ENSET à Kumba, Mission 3- etc CM-MINHDU-169825-CS- CQS / Maîtrise d’œuvre Improving Connectivity and Consultant complète pour la réalisation Under IDA / 61320 Living environment in Post Qualification Open - National 85,645.00 0.00 2020-06-25 2021-01-13 2020-07-16 2020-08-29 2020-09-28 2020-11-02 2022-06-25 travaux de voiries et Implementation Beneficiary Cities Selection d’équipements de proximité dans la ville de Kousseri CM-MINHDU-143813-CS- QCBS / Maîtrise d’œuvre Improving Connectivity and complète pour la réalisation Quality And Cost- Under IDA / 61320 Living environment in Post Open - National 544,964.00 0.00 2020-05-25 2020-05-26 2020-06-15 2020-06-16 2020-07-29 2021-03-08 2020-08-26 2021-05-05 2020-09-25 2020-10-30 2020-12-04 2022-05-28 des travaux de voiries et Based Selection Implementation Beneficiary Cities d’équipements de proximité à Yaoundé 5ème et 7ème CM-MINHDU-91451-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant pour la réalisation des travaux IDA / 61320 Living environment in Post Qualification Open - National 199,629.00 191,823.43 Signed 2020-06-20 2020-06-09 2020-07-18 2020-08-31 2020-12-24 2020-10-12 2021-01-14 2020-11-16 2021-02-22 2023-05-05 de voiries et d'équipements Beneficiary Cities Selection de proximité à Ngaounderé Page 6 CM-MINHDU-91386-CS- QCBS / Contrôle et Improving Connectivity and Quality And Cost- surveillance des travaux de IDA / 61320 Living environment in Post Open - National 464,908.00 0.00 Canceled 2020-02-20 2020-03-19 2020-05-30 2020-06-29 2020-08-10 2020-10-05 2020-11-09 2022-03-04 Based Selection voiries structurants dans la Beneficiary Cities ville de Kumba CM-MINHDU-91437-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant pour la réalisation des travaux IDA / 61320 Living environment in Post Qualification Open - National 108,735.00 136,975.50 Signed 2020-08-31 2020-06-09 2020-09-28 2020-11-27 2020-12-24 2021-01-08 2021-01-14 2021-02-12 2021-01-25 2023-07-02 de voiries et d'équipements Beneficiary Cities Selection de proximité dans la ville de Batouri CM-MINHDU-91474-CS-CQS / Recrutement d'un consultant Improving Connectivity and Consultant (firme) pour la réalisation des IDA / 61320 Living environment in Post Qualification Open - National 61,658.00 0.00 Canceled 2020-01-28 2020-02-25 2020-04-21 2020-05-05 2020-05-26 2021-01-21 EIES et PAR des sous projets Beneficiary Cities Selection de proximité dans la ville de Douala CM-MINHDU-179938-CS- CQS / Réalisation des études techniques des sous-projets Improving Connectivity and Consultant pilotes pour l'amélioration de IDA / 61320 Living environment in Post Qualification Open - National 52,202.00 61,283.04 Signed 2018-04-04 2018-01-26 2018-04-25 2018-06-08 2018-03-13 2018-07-08 2018-04-27 2018-08-12 2019-11-07 2019-02-08 la mobilité piétonne dans Beneficiary Cities Selection certains quartiers de la ville de Yaoundé CM-MINHDU-179147-CS- CQS / Recrutement d’un Strengthening Capacity for consultant pour l’élaboration Quality And Cost- Under IDA / 61320 Inclusive and Resilient Urban Post Open - International 450,000.00 0.00 2020-10-01 2020-11-18 2020-10-22 2020-12-04 2020-12-05 2021-01-02 2021-02-01 2021-03-08 2021-04-12 2022-04-12 des plans de secteur (PS) à Based Selection Implementation Management Douala 3 (Ndogpassi) et Douala 5 (Beedi) CM-MINHDU-179149-CS- CQS / Recrutement d’un Strengthening Capacity for consultant pour l’élaboration Quality And Cost- Under IDA / 61320 Inclusive and Resilient Urban Post Open - International 380,000.00 0.00 2020-10-01 2020-11-18 2020-10-22 2020-12-04 2020-12-05 2021-01-02 2021-02-01 2021-03-08 2021-04-12 2022-04-12 des plans de secteur (PS) à Based Selection Implementation Management Yaoundé 5 (Nkolmessen) et Yaoundé 7 (Oyom abang) CM-MINHDU-91725-CS- QCBS / Recrutement d'un Project Management, Quality And Cost- consultant (firme) chargé de IDA / 61320 Coordination, Monitoring and Prior Open - International 1,520,000.00 0.00 Canceled 2020-08-15 2020-09-12 2020-11-21 2020-12-21 2021-02-15 2021-04-14 2021-05-12 2024-04-26 Based Selection l'assistance à maitrise Evaluation d'ouvrage auprès des CTD CM-MINHDU-91720-CS-CQS Project Management, Consultant / Recrutement d'un consultant Pending IDA / 61320 Coordination, Monitoring and Post Qualification Open - National 50,000.00 0.00 2022-07-12 2022-08-09 2022-09-20 2022-10-11 2022-11-01 2023-04-30 (firme) pour l'audit technique Implementation Evaluation Selection des activités du PDVIR CM-MINHDU-206619-CS- CQS / Recrutement d'un Improving Connectivity and Consultant consultant(firme) pour la Under IDA / 61320 Living environment in Post Qualification Open - National 34,260.00 0.00 2021-03-10 2021-03-03 2021-03-31 2021-05-26 2021-05-06 2021-05-21 2021-06-14 2021-06-15 réalisation des PAR des sous Implementation Beneficiary Cities Selection projets de proximité dans la ville de Yaoundé CM-MINHDU-215990-CS- CQS / Réalisation de l'EIES Improving Connectivity and Consultant des travaux pilotes pour la Under IDA / 61320 Living environment in Post Qualification Open - National 17,129.00 0.00 2021-03-25 2021-02-27 2021-04-15 2021-05-29 2021-06-28 2021-08-02 2022-01-29 mobilité piétonne dans Implementation Beneficiary Cities Selection certains quartiers de la ville de Yaoundé CM-MINHDU-215993-CS- CQS / Réalisation du PAR des Improving Connectivity and Consultant travaux pilotes pour la Under IDA / 61320 Living environment in Post Qualification Open - National 30,832.00 0.00 2021-02-26 2021-02-26 2021-03-19 2021-05-02 2021-06-01 2021-07-06 2022-01-02 mobilité piétonne dans Implementation Beneficiary Cities Selection certains quartiers de la ville de Yaoundé CM-MINHDU-213480-CS- CQS / Recrutement d'un Improving Connectivity and Consultant consultant pour la réalisation Under IDA / 61320 Living environment in Post Qualification Open - National 17,153.00 0.00 2021-04-12 2021-03-26 2021-04-14 2021-05-14 2021-05-29 2021-06-15 2021-10-13 des EIES des sous projets de Implementation Beneficiary Cities Selection proximité dans les villes de Kousséri et Maroua CM-MINHDU-212905-CS- CQS / Sélection d’un Improving Connectivity and Consultant consultant pour l’élaboration Under IDA / 61320 Living environment in Post Qualification Open - National 24,014.00 0.00 2021-04-07 2021-03-03 2021-04-28 2021-05-27 2021-06-11 2021-07-04 2021-12-31 des PAR des sous projets de Implementation Beneficiary Cities Selection proximité dans les villes de Batouri et Ngaoundéré CM-MINHDU-213479-CS- CQS / Sélection d'un Strengthening Capacity for Consultant Consultant pour la réalisation Under IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 25,694.00 0.00 2021-04-05 2021-03-03 2021-04-26 2021-04-28 2021-05-25 2021-06-09 2021-07-02 2021-12-29 des PAR des sous-projets de Implementation Management Selection proximité dans les villes de Douala 3è et 5è CM-MINHDU-94781-CS-CQS / Recrutement d'un consultant Improving Connectivity and Consultant (firme) pour la réalisation des Under IDA / 61320 Living environment in Post Qualification Open - National 24,014.00 0.00 2021-09-30 2021-03-03 2021-10-28 2021-12-23 2022-01-22 2022-02-19 2022-08-18 PAR des sous projets de Implementation Beneficiary Cities Selection proximité dans les villes de Kousserie et Maroua CM-MINHDU-91466-CS-CQS / Recrutement d'un Improving Connectivity and Consultant consultant(firme) pour la IDA / 61320 Living environment in Post Qualification Open - National 61,658.00 0.00 Canceled 2020-06-10 2020-07-08 2020-09-02 2020-09-23 2020-10-14 2021-06-11 réalisation des EIES et PAR des Beneficiary Cities Selection sous projets de proximité dans la ville de Yaoundé CM-MINHDU-169915-CS- CQS / Recrutement d'un Improving Connectivity and Consultant consultant (firme) pour la IDA / 61320 Living environment in Post Qualification Open - National 34,258.00 0.00 Canceled 2020-06-30 2020-07-21 2020-09-03 2020-10-03 2020-11-07 2021-05-06 réalisation des EIES et PAR des Beneficiary Cities Selection sous projets de proximité Kousséri Page 7 CM-MINHDU-91868-GO-RFB Strengthening Capacity for / mise en place d'un système Quality And Cost- Pending IDA / 61320 Inclusive and Resilient Urban Post Open - International 257,289.00 0.00 2021-07-12 2021-08-02 2021-09-15 2021-10-13 2021-11-12 2021-12-17 2022-01-21 2023-01-21 d'archivage électronique à la Based Selection Implementation Management DOU CM-MINHDU-179199-CS- CQS / Recrutement d’un consultant pour le Strengthening Capacity for Quality And Cost- développement d'un outil de IDA / 61320 Inclusive and Resilient Urban Post Open - International 475,000.00 0.00 Canceled 2020-09-15 2020-10-06 2020-11-19 2020-12-17 2021-01-16 2021-02-20 2021-03-27 2022-03-27 Based Selection programmation et de gestion Management de l'entretien des VRD à Douala CM-MINHDU-91541-CS- QCBS / Appui à l'amélioration Strengthening Capacity for de la programmation et de la Quality And Cost- Pending IDA / 61320 Inclusive and Resilient Urban Post Open - International 666,666.00 0.00 2021-12-20 2022-01-17 2022-03-28 2022-04-27 2022-06-22 2022-08-19 2022-09-16 2023-03-15 réalisation du budget à Based Selection Implementation Management Douala, Yaoundé, Ngaoundere et Kumba CM-MINHDU-91498-CS-CQS / Recrutement d’un consultant pour l’actualisation Improving Connectivity and Consultant Pending des PGES des sous projets de IDA / 61320 Living environment in Post Qualification Open - National 51,388.00 0.00 2021-05-31 2021-06-28 2021-08-23 2021-09-13 2021-10-11 2022-06-08 Implementation proximité dans les villes de Beneficiary Cities Selection Batouri, Douala, Ngaoundéré et Yaoundé . CM-MINHDU-212759-CS- QCBS / Recrutement d'un consultant pour Strengthening Capacity for l'assainissement des comptes Quality And Cost- IDA / 61320 Inclusive and Resilient Urban Post Open - National 351,629.00 0.00 Canceled 2021-04-08 2021-04-29 2021-06-12 2021-07-10 2021-07-31 2021-08-29 2021-09-27 2022-03-26 des communes des ville Based Selection Management Batouri, Douala, Ngaoundéré, Yaoundé et Kousséri dans le cadre du PDVIR CM-MINHDU-214526-CS- CQS / Recrutement d'un consultant pour la réalisation Strengthening Capacity for Consultant de l'étude sur les méthodes IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 171,291.00 0.00 Canceled 2021-05-10 2021-05-11 2021-05-31 2021-06-15 2021-06-30 2021-07-23 2022-01-19 d'aménagement concerté en Management Selection zone urbaine dense et dans les zones d'extension urbaine CM-MINHDU-169848-CS- Strengthening Capacity for Consultant CQS / Appui à la préparation IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 53,956.00 0.00 Canceled 2020-06-15 2020-06-30 2020-07-06 2020-08-19 2020-12-10 2020-09-18 2021-04-13 2020-10-23 2021-04-21 des contrats de ville de Management Selection Maroua et Kousséri CM-MINHDU-179152-CS- CQS / Recrutement d’un consultant (firme) pour l’élaboration du Plan d’Organisation et Strengthening Capacity for Consultant d’Optimisation des Effectifs IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 222,678.00 0.00 Canceled 2020-10-01 2021-05-12 2020-10-22 2020-12-05 2021-01-04 2021-02-08 2021-05-09 (POE) de la CU de Ndéré; des Management Selection CA de Dla III, Dla V, Ydé V, Ydé VII, Mroua I, Ndéré des communes de Kousséri et Batouri CM-MINHDU-143812-CS- CQS / Maîtrise d’œuvre Improving Connectivity and Consultant complète pour la réalisation IDA / 61320 Living environment in Post Qualification Open - National 214,113.00 0.00 Canceled 2020-01-20 2020-06-29 2020-02-10 2020-03-25 2020-12-11 2020-04-24 2020-11-23 2020-05-29 2021-11-20 travaux de voiries et Beneficiary Cities Selection d’équipements de proximité dans la ville de Maroua CM-MINHDU-236635-CS- QCBS / Recrutement d’un consultant (firme) pour l’élaboration du Plan d’Organisation et Strengthening Capacity for Quality And Cost- Pending d’Optimisation des Effectifs IDA / 61320 Inclusive and Resilient Urban Post Open - National 308,324.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2022-07-08 Based Selection Implementation (POE) de la CU de Ndéré; des Management CA de Dla III, Dla V, Ydé V, Ydé VII, Mroua I, Ndéré des communes de Kousséri et Batouri CM-MINHDU-236634-CS- QCBS / Recrutement d'un consultant pour la réalisation Strengthening Capacity for Quality And Cost- Pending de l'étude sur les méthodes IDA / 61320 Inclusive and Resilient Urban Post Open - International 256,937.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2022-11-05 Based Selection Implementation d'aménagement concerté en Management zone urbaine dense et dans les zones d'extension urbaine CM-MINHDU-236426-CS- Strengthening Capacity for Consultant CQS / Appui à la préparation Under IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 102,915.00 0.00 2020-06-15 2020-07-07 2020-12-10 2020-12-22 2021-01-26 2021-08-09 des contrats de ville de Implementation Management Selection Maroua et Kousséri CM-MINHDU-236165-CS- CQS / Maîtrise d’œuvre Improving Connectivity and Consultant complète pour la réalisation Under IDA / 61320 Living environment in Post Qualification Open - National 446,219.00 0.00 2020-01-20 2020-06-29 2020-07-07 2020-09-22 2020-11-23 2021-09-10 2023-04-18 travaux de voiries et Implementation Beneficiary Cities Selection d’équipements de proximité dans la ville de Maroua CM-MINHDU-237968-CS- CQS / Appui au PDVIR dans la mise en œuvre du plan d'actions de prévention et Improving Connectivity and Consultant Under d’atténuation des VBG, des IDA / 61320 Living environment in Post Qualification Open - National 146,692.00 0.00 2021-01-13 2020-09-17 2021-02-03 2021-03-19 2021-01-11 2021-04-18 2021-05-23 2022-01-18 Implementation VCE et des EAS, dans sept Beneficiary Cities Selection villes (Batouri, Douala, Kousséri, Kumba, Maroua, Ngaoundéré et Yaoundé CM-MINHDU-179413-CS- CQS / Recrutement d'un consultant (ONG) spécialisée Improving Connectivity and Consultant VBG pour appuyer la Cellule IDA / 61320 Living environment in Post Qualification Open - National 123,330.00 0.00 Canceled 2020-10-01 2021-01-13 2020-10-22 2020-12-05 2021-01-11 2021-01-04 2021-02-08 2021-08-07 de Coordination du Projet Beneficiary Cities Selection dans la préparation et la mise en oeuvre des activités de VBG. Page 8 CM-MINHDU-179179-CS- CQS / Recrutement d'un consultant pour la réalisation de l'Etude de faisabilité de la mise en place des outils et Strengthening Capacity for Consultant Pending méthodes en vue de IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 137,000.00 0.00 2021-07-30 2021-08-20 2021-10-03 2021-11-02 2021-12-07 2022-04-06 Implementation l’optimisation du rendement Management Selection des recettes de la Communauté urbaine et des Communes d’arrondissement de Ngaoundéré CM-MINHDU-179208-CS- CQS / Recrutement d’un consultant pour le Strengthening Capacity for Quality And Cost- Pending développement d'un outil de IDA / 61320 Inclusive and Resilient Urban Post Open - International 513,874.00 0.00 2020-09-25 2020-10-16 2020-11-29 2020-12-27 2021-01-26 2021-03-02 2021-04-06 2022-04-06 Based Selection Implementation programmation et de gestion Management de l'entretien des VRD à Douala CM-MINHDU-212750-CS- QCBS / Sélection d'un consultant pour l'élaboration Strengthening Capacity for des schémas directeurs des Quality And Cost- Pending IDA / 61320 Inclusive and Resilient Urban Post Open - National 334,476.00 0.00 2021-04-09 2021-04-30 2021-05-29 2021-06-26 2021-06-27 2021-08-01 2021-08-30 2022-01-27 équipements marchands des Based Selection Implementation Management villes de Ngaoundéré et Yaoundé dans le cadre du PDVIR CM-MINHDU-238083-CS- CQS / Étude de faisabilité de deux applicatifs de Strengthening Capacity for Consultant Pending l’adressage de Yaoundé IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 128,468.27 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-03-07 Implementation (gestion des taxes et gestion Management Selection des travaux sur les Voiries et Réseaux Divers) CM-MINHDU-212755-CS- CQS / Recrutement d'un consultant en vue de Strengthening Capacity for Consultant l'élaboration du schéma IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 171,526.00 0.00 Canceled 2021-05-31 2021-06-21 2021-07-26 2021-08-10 2021-08-28 2021-12-26 directeur des marchés et des Management Selection pôles commerciaux de la ville de Douala. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11672-CS- INDV / Recrutement de l'évaluateur externe pour la Project Management, Individual mise en œuvre des PAR dans IDA / V0100 Coordination, Monitoring and Post Consultant Limited 8,347.00 0.00 Canceled 2017-10-15 2017-10-20 2017-11-10 2017-12-04 2018-01-03 les villes de Yaoundé, Douala, Evaluation Selection Batouri, Kumba et Ngaoundéré. CM-MINHDU-11666-CS- INDV / Recrutement d'un Project Management, Individual consultant formateur dans le IDA / V0100 Coordination, Monitoring and Post Consultant Limited 13,912.00 0.00 Canceled 2017-05-15 2017-05-20 2017-05-30 2017-06-19 2017-07-19 cadre de l'atelier itinérant sur Evaluation Selection la note méthodologique CCE dans les 5 villes CM-MINHDU-17030-CS-CDS / Recrutement d'un consultant individuel pour l'étude Improving Connectivity and d'optimisation du design IDA / V0100 Living environment in Post Direct Selection Direct 23,850.00 0.00 Canceled 2017-06-06 2017-06-16 2017-08-20 2017-11-18 technique de la station de Beneficiary Cities traitement des boues de vidange de Ngombè CM-MINHDU-17131-CS- INDV / Recrutement d'un Project Management, Individual consultant formateur dans le IDA / V0100 Coordination, Monitoring and Post Consultant Limited 13,912.00 0.00 Canceled 2017-10-15 2017-10-20 2017-11-10 2017-12-15 2017-12-20 cadre de l'atelier itinérant sur Evaluation Selection la note méthodologique CCE dans les 5 villes CM-MINHDU-11761-CS- Project Management, Individual INDV / Recrutement d'un IDA / V0100 Coordination, Monitoring and Prior Consultant Open 26,831.00 0.00 Canceled 2017-08-31 2017-10-19 2017-10-29 2017-11-18 2018-11-18 Spécialiste en développement Evaluation Selection social au sein de la CP/PDVI CM-MINHDU-17144-CS- INDV / Recrutement d'un Project Management, Individual spécialiste en développement IDA / V0100 Coordination, Monitoring and Prior Consultant Open 37,857.00 0.00 Canceled 2017-07-31 2017-09-18 2017-10-09 2017-11-13 2018-11-13 municipal au sein de la Evaluation Selection CC/PDVI CM-MINHDU-17147-CS- Project Management, Individual INDV / Recrutement d'un IDA / V0100 Coordination, Monitoring and Prior Consultant Open 37,857.00 0.00 Canceled 2017-07-31 2017-09-18 2017-10-09 2017-11-13 2018-11-13 auditeur interne au sein de la Evaluation Selection CC/PDVI CM-MINHDU-11759-CS-CDS Project Management, / Contrat du Responsable IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-15 2017-09-30 environnemental et social du Evaluation PDVI CM-MINHDU-91716-CS- Project Management, Individual INDV / Recrutement de IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,528.00 27,320.07 Signed 2019-08-30 2019-10-10 2019-10-25 2020-04-14 2019-11-22 2020-05-13 2019-12-06 2020-06-22 2020-12-05 l'auditeur interne de la Evaluation Selection CC/PDVIR CM-MINHDU-91718-CS- Project Management, Individual INDV / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Consultant Open 24,635.00 27,403.58 Signed 2019-08-30 2019-10-11 2019-10-25 2020-04-15 2019-11-22 2020-05-14 2019-12-06 2020-06-18 2020-12-05 Spécialiste en développement Evaluation Selection social au sein de la CC/PDVIR Page 9 CM-MINHDU-11743-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 59,151.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-20 2017-11-16 Coordonnateur du PDVI Evaluation CM-MINHDU-27471-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 59,192.00 0.00 Canceled 2017-09-06 2017-09-16 2017-10-03 2018-06-30 coordonnateur du PDVIR Evaluation CM-MINHDU-27476-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 responsable environnemental Evaluation et social du PDVIR CM-MINHDU-27473-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 30,286.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 Responsable administratif et Evaluation financier du PDVIR CM-MINHDU-27477-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-03-26 Responsable de Passation des Evaluation marchés du PDVIR CM-MINHDU-11757-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-04-05 2017-04-25 2017-04-15 2017-05-15 2017-09-30 Comptable du PDVI Evaluation CM-MINHDU-11748-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 20,190.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-15 2017-09-30 Responsable Administratif et Evaluation Financier du PDVI CM-MINHDU-27475-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 Comptable du PDVIR Evaluation CM-MINHDU-27480-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 chauffeur 2 au sein du PDVIR Evaluation CM-MINHDU-27483-CS-CDS Project Management, / Avenant au contrat d'un IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 agent d'entretien 1 au sein du Evaluation PDVIR CM-MINHDU-27481-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 5,679.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 Chauffeur 3 au sein du PDVIR Evaluation CM-MINHDU-27485-CS-CDS Project Management, / Avenant au contrat d'un IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 agent d'entretien 2 au sein du Evaluation PDVIR CM-MINHDU-27479-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-03-26 chauffeur 1 au sein du PDVIR Evaluation CM-MINHDU-27478-CS-CDS Project Management, / Avenant au contrat de IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 9,464.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 l'Assistant administratif et Evaluation financier du PDVIR CM-MINHDU-12004-CS-CDS Project Management, / Avenant au Contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 5,679.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 Chauffeur 3 au sein du PDVI Evaluation CM-MINHDU-12001-CS-CDS Project Management, / Avenant au Contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 Chauffeur 1 au sein du PDVI Evaluation CM-MINHDU-12003-CS-CDS Project Management, / Avenant au Contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 Chauffeur 2 au sein du PDVI Evaluation CM-MINHDU-11998-CS-CDS Project Management, / Avenant au Contrat de IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 9,464.00 0.00 Canceled 2017-04-06 2017-04-18 2017-04-16 2017-05-16 2017-09-30 l'Assistant Administratif et Evaluation financier du PDVI CM-MINHDU-12005-CS-CDS Project Management, / Avenant au contrat d'un IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 agent 1 d'entretien Evaluation CM-MINHDU-12012-CS-CDS Project Management, / Avenant au Contrat d'un IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 agent 2 d'entretien Evaluation CM-MINHDU-111502-CS- Project Management, Individual INDV / Recrutement du IDA / 61320 Coordination, Monitoring and Post Consultant Open 43,200.00 40,980.09 Signed 2019-04-22 2019-03-18 2019-06-10 2019-05-17 2019-07-01 2019-05-21 2019-08-05 2019-05-28 2020-08-04 Responsable en Passation des Evaluation Selection marchés de la CC/PDVIR CM-MINHDU-116139-CS- INDV / Recrutement d'un Project Management, Individual Responsable en IDA / 61320 Coordination, Monitoring and Post Consultant Open 37,857.00 48,584.27 Signed 2019-05-27 2020-09-24 2019-07-29 2020-06-01 2019-08-19 2020-06-05 2019-09-23 2020-07-07 2020-09-22 Développement Municipal au Evaluation Selection sein de la CC/PDVIR CM-MINHDU-116141-CS- CDS / Recrutement d'un Project Management, Responsable Administratif et IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 45,036.00 47,637.22 Signed 2019-05-23 2019-04-29 2019-06-11 2019-05-14 2019-08-15 2019-05-22 2020-08-14 Financier au sein de la Evaluation CC/PDVIR CM-MINHDU-116347-CS- Project Management, CDS / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 27,210.00 27,199.24 Signed 2019-05-23 2019-05-02 2019-06-11 2019-05-06 2019-08-15 2019-05-22 2020-08-14 Comptable au sein de la Evaluation CC/PDVIR Page 10 CM-MINHDU-116759-CS- Project Management, CDS / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 167,800.00 169,626.80 Signed 2019-05-31 2019-05-02 2019-06-10 2019-05-17 2019-08-14 2019-05-22 2021-08-13 Coordonnateur à la CC/PDVIR Evaluation CM-MINHDU-123018-CS- INDV / Recrutement d’un Improving Connectivity and Individual consultant individuel chargé IDA / V0100 Living environment in Post Consultant Open 18,000.00 20,005.88 Signed 2016-01-23 2016-07-29 2016-03-12 2016-11-01 2016-04-02 2016-11-23 2016-05-07 2017-01-05 2016-11-03 de l’analyse économique du Beneficiary Cities Selection PDVI. CM-MINHDU-91719-CS- Project Management, Individual INDV / Recrutement de IDA / 61320 Coordination, Monitoring and Post Consultant Open 13,051.00 16,481.41 Signed 2019-11-10 2019-11-22 2020-01-05 2020-11-30 2020-01-19 2020-12-29 2020-02-02 2021-01-06 2021-02-01 l'assistant au responsable en Evaluation Selection suivi évaluation CM-MINHDU-91712-CS- INDV / Recrutement d'un Project Management, Individual consultant individuel pour la IDA / 61320 Coordination, Monitoring and Post Consultant Open 33,335.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-11-21 conception, mise en ligne, Evaluation Selection administration du site web du Projet CM-MINHDU-91713-CS- INDV / Recrutement d'un Project Management, Individual consultant individuel pour IDA / 61320 Coordination, Monitoring and Post Consultant Open 33,335.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-11-21 appui à la communication Evaluation Selection dans les CTD de ressort du PDVIR et à la CC/PDVIR CM-MINHDU-91561-CS- INDV / Recrutement d'un Consultant individuel chargé de l'appui à l'élaboration du Strengthening Capacity for Individual bilan de 15 ans de IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 33,334.00 0.00 Canceled 2019-09-30 2019-11-25 2019-12-09 2019-12-23 2020-06-20 contractualisation Etat-villes, Management Selection y compris l'élaboration d'une stratégie d'intervention et d'un guide méthodologique. CM-MINHDU-91717-CS- INDV / Recrutement d'un Project Management, Individual spécialiste en développement IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,528.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-22 2019-12-06 2020-12-05 municipal au sein de la Evaluation Selection CC/PDVIR CM-MINHDU-94783-CS- INDV / Etude de programmation des travaux Improving Connectivity and Individual d'amélioration de l'accès aux IDA / 61320 Living environment in Post Consultant Open 68,539.00 0.00 Canceled 2019-05-31 2019-08-09 2019-08-30 2019-09-27 2020-01-25 services de base dans certains Beneficiary Cities Selection quartiers dans la ville de kousseri CM-MINHDU-91803-CS- Strengthening Capacity for Individual INDV / modes de gestion et IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 entretien des ouvrages Management Selection communautaires CM-MINHDU-91456-CS- INDV / Contrôle et surveillance pour la réalisation Improving Connectivity and Individual des travaux de plantation IDA / 61320 Living environment in Post Consultant Open 49,046.00 0.00 Canceled 2020-05-29 2020-07-17 2020-08-07 2020-09-11 2022-10-01 d'arbres dans les Beneficiary Cities Selection arrondissements de Douala 3e et 5e CM-MINHDU-91802-CS- Strengthening Capacity for Individual INDV / tenue des livres IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 comptables et suivi des Management Selection dépenses communautaires, CM-MINHDU-91804-CS- INDV / formation des personnels des services Strengthening Capacity for Individual financiers des communes IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 46,248.00 0.00 Canceled 2019-08-30 2019-11-22 2019-12-22 2020-01-12 2020-07-10 impliquées dans la mise en Management Selection œuvre du PDVIR en finances locales, comptabilité et fiscalité CM-MINHDU-91801-CS- INDV / la communication sociale: gestion des sources, Strengthening Capacity for Individual canaux et type d'informations, IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 évaluation des enjeux et Management Selection impacts de l'information sur les populations CM-MINHDU-139682-CS- INDV / Recrutement d'un Project Management, Individual Under Conseiller Principal à la IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,626.00 0.00 2019-11-20 2021-01-13 2020-01-08 2020-01-29 2020-03-04 2020-08-31 Implementation Cellule de Coordination du Evaluation Selection PDVIR CM-MINHDU-139683-CS- INDV / Recrutement d'un Project Management, Individual Ingénieur de Génie Civil à la IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,626.00 41,084.57 Signed 2019-11-20 2019-10-22 2020-01-08 2020-03-02 2020-01-29 2020-04-17 2020-03-04 2020-06-18 2020-08-31 Cellule de Coordination du Evaluation Selection PDVIR CM-MINHDU-139685-CS- Project Management, Individual INDV / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,626.00 34,026.65 Signed 2019-11-20 2019-10-22 2020-01-08 2020-03-02 2020-01-29 2020-04-17 2020-03-04 2020-06-18 2020-08-31 Responsable en Gestion Evaluation Selection Environnementale CM-MINHDU-139689-CS- INDV / Recrutement d'un Project Management, Individual Assistant en Passation des IDA / 61320 Coordination, Monitoring and Post Consultant Open 21,751.00 20,552.67 Signed 2019-11-20 2019-12-04 2020-01-08 2020-06-16 2020-01-29 2020-06-22 2020-03-04 2020-08-20 2020-08-31 marchés à la Cellule de Evaluation Selection Coordination du PDVIR Page 11 CM-MINHDU-139693-CS- INDV / Recrutement d'un Project Management, Individual Assistant Administratif et IDA / 61320 Coordination, Monitoring and Post Consultant Open 10,875.00 16,481.41 Signed 2019-11-20 2019-12-18 2020-01-08 2020-11-30 2020-01-29 2020-12-29 2020-03-04 2021-01-06 2021-02-27 Financier à la Cellule de Evaluation Selection Coordination du PDVIR CM-MINHDU-139702-CS- INDV / Recrutement d'un Project Management, Individual Assistant des Responsables de IDA / 61320 Coordination, Monitoring and Post Consultant Open 10,875.00 17,070.03 Signed 2019-11-20 2019-11-22 2020-01-08 2020-11-30 2020-01-29 2020-11-30 2020-03-04 2021-01-06 2021-02-27 gestion environnementale et Evaluation Selection sociale au sein de la Cellule de Coordination du PDVIR CM-MINHDU-139706-CS- INDV / Recrutement d'une Project Management, Individual Assistante de projet au sein IDA / 61320 Coordination, Monitoring and Post Consultant Open 10,875.00 14,126.93 Signed 2019-11-20 2020-07-14 2020-01-08 2020-11-30 2020-01-29 2020-12-30 2020-03-04 2021-01-06 2021-02-27 de la Cellule de Coordination Evaluation Selection du PDVIR CM-MINHDU-139707-CS- Project Management, Individual INDV / Recrutement d'une IDA / 61320 Coordination, Monitoring and Post Consultant Open 8,700.00 11,493.21 Signed 2019-11-20 2019-11-22 2020-01-08 2020-06-30 2020-01-29 2020-10-29 2020-03-04 2020-11-02 2020-08-31 secrétaire au sein de la Cellule Evaluation Selection de Coordination du PDVIR CM-MINHDU-91658-CS- Project Management, Individual INDV / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Consultant Open 21,751.00 20,687.75 Signed 2019-11-30 2019-11-22 2020-01-25 2020-08-31 2020-02-15 2020-09-29 2020-02-29 2020-10-07 2021-02-23 ingénieur assistant à la Cellule Evaluation Selection de Coordination du PDVIR CM-MINHDU-27468-CS- INDV / Recrutement d'un consultant individuel pour Strengthening Capacity for Individual l'optimisation des études IDA / 61320 Inclusive and Resilient Urban Post Consultant Limited 81,221.00 84,419.60 Signed 2017-09-06 2017-08-17 2017-09-11 2017-08-24 2017-09-21 2020-10-27 2017-10-08 2020-12-10 2018-01-06 techniques du projet de Management Selection construction de la station de traitement des boues de vidange de Ngombè CM-MINHDU-144175-CS- CDS / Renouvellement des Project Management, contrats de trois (03) Under IDA / 61320 Coordination, Monitoring and Post Direct Selection 16,443.00 0.00 2019-12-15 2021-01-13 2019-12-27 2020-01-17 2021-01-11 chauffeurs pour les véhicules Implementation Evaluation de la Cellule de Coordination du PDVIR CM-MINHDU-144176-CS- CDS / Renouvellement des Project Management, Under contrats de deux (02) agents IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 4,110.00 0.00 2019-12-17 2019-11-22 2019-12-27 2020-02-07 2021-02-01 Implementation d’entretien à la Cellule de Evaluation Cordination du PDVIR CM-MINHDU-144288-CS- CDS / Recrutement d'un Project Management, auditeur externe pour l'audit Under IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 51,712.00 0.00 2019-11-30 2021-01-13 2019-12-10 2020-02-13 2021-02-07 comptable et financier du Implementation Evaluation PDVIR (période PPA , exercice 2019 et 2020) CM-MINHDU-169875-CS- INDV / Recrutement de Improving Connectivity and Individual l'évaluateur externe de la mise IDA / 61320 Living environment in Post Consultant Limited 7,023.00 7,919.68 Signed 2020-06-15 2020-11-24 2020-06-20 2020-11-30 2020-07-11 2020-12-29 2020-08-15 2021-01-27 2020-09-14 en œuvre du PAR (sous- Beneficiary Cities Selection projets structurants) CM-MINHDU-179928-CS- INDV / Recrutement d'un Consultant Individuel chagé Improving Connectivity and Individual de la préparation d'une étude IDA / 61320 Living environment in Post Consultant Open 61,234.00 60,826.48 Signed 2016-06-29 2016-06-29 2016-08-24 2016-09-30 2016-09-14 2016-09-30 2016-10-19 2017-01-05 2017-04-17 sociale et d'un plan de Beneficiary Cities Selection développement communautaire de la Jeunesse CM-MINHDU-179937-CS- CDS / Réalisation des Plans d'Actions de Réinstallation des populations affectées dans le cadre des travaux Improving Connectivity and Under d'aménagement de certaines IDA / 61320 Living environment in Post Direct Selection Direct 13,718.00 0.00 2016-11-11 2021-01-13 2016-11-21 2017-01-25 2017-07-24 Implementation voiries structurantes dans les Beneficiary Cities arrondissements de Yaoundé 5 et 7, Douala 3 et 5, Ngaoundéré 2, Kumba 2 et Batouri CM-MINHDU-215982-CS- INDV / Recrutement d'un Spécialiste en Passation Project Management, Individual junior à l'Unité de Liaison Under IDA / 61320 Coordination, Monitoring and Post Consultant Open 15,225.00 0.00 2021-03-25 2021-03-05 2021-05-13 2021-06-03 2021-07-08 2022-01-04 Technique (UTL) de Yaoundé Implementation Evaluation Selection du Projet de Développement des villes Inclusives et résilientes (PDVIR) CM-MINHDU-215972-CS- INDV / Recrutement d'un Spécialiste en passation Project Management, Individual junior à l'Unité de Liaison Under IDA / 61320 Coordination, Monitoring and Post Consultant Open 15,225.00 0.00 2021-02-25 2021-03-05 2021-04-15 2021-05-06 2021-06-10 2021-12-07 Technique (UTL) de Douala du Implementation Evaluation Selection Projet de Développement des villes Inclusives et résilientes (PDVIR) CM-MINHDU-212726-CS- INDV / Sélection d'un consultant individuel pour Strengthening Capacity for Individual Under l'évaluation de la capacité de IDA / 61320 Inclusive and Resilient Urban Post Consultant Limited 20,583.00 0.00 2021-04-07 2021-03-26 2021-04-12 2021-04-15 2021-04-22 2021-05-15 2021-07-14 Implementation réponse des communes à la Management Selection crise sanitaire liée au Covid- 19 dans le cadre du PDVIR Page 12 CM-MINHDU-179158-CS- CQS / Recrutement d’un consultant individuel pour l’assistance technique Strengthening Capacity for Individual d’accompagnement des CTD à IDA / 61320 Inclusive and Resilient Urban Post Consultant Limited 15,416.00 0.00 Canceled 2020-08-10 2020-08-15 2020-09-05 2020-10-10 2021-01-08 l'identification et à la mise en Management Selection œuvre des mesures de lutte contre le covid-19 (yaoundé, ngdéré, maroua, kousseri, douala, batouri) CM-MINHDU-169893-CS- CDS / Recrutement d’un consultant (ONG) chargé des Etudes pour les travaux destinées à préserver la Improving Connectivity and capacité de drainage naturelle IDA / 61320 Living environment in Post Direct Selection Direct 10,277.00 0.00 Canceled 2020-06-30 2020-07-10 2020-09-06 2021-09-01 et contribuer à l’adaptation au Beneficiary Cities changement climatique dans les villes bénéficiaires (Batouri, Douala, Ngaoundéré et Yaoundé) CM-MINHDU-221625-CS- CDS / Recrutement d'un Project Management, Assistant en Passation des IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 21,000.00 35.59 Signed 2021-03-15 2021-02-26 2021-03-25 2021-03-02 2021-05-29 2021-03-15 2022-05-24 marchés à la Cellule de Evaluation Coordination du PDVIR CM-MINHDU-144177-CS- INDV / Recrutement d'un Project Management, Individual chauffeur à la Cellule de IDA / 61320 Coordination, Monitoring and Post Consultant Open 5,138.00 0.00 Canceled 2019-12-15 2021-01-13 2020-02-02 2020-02-23 2020-03-29 2021-03-24 Coordination du PDVIR pour le Evaluation Selection nouveau véhicule. CM-MINHDU-226965-CS- INDV / Recrutement d'un Project Management, Individual Under Responsable de la Passation IDA / 61320 Coordination, Monitoring and Post Consultant Open 39,206.00 0.00 2021-05-03 2021-04-22 2021-06-05 2021-06-19 2021-07-10 2022-07-10 Implementation des marchés à la Cellule de Evaluation Selection Coordination du PDVIR CM-MINHDU-240579-CS- INDV / Recrutement d'un Project Management, Individual Assistant au Responsable en Pending IDA / 61320 Coordination, Monitoring and Post Consultant Open 15,769.63 0.00 2021-07-30 2021-09-17 2021-10-08 2021-11-12 2022-11-07 Développement Urbain et Implementation Evaluation Selection Municipal au sein de la Cellule de Coordination du PDVIR CM-MINHDU-240588-CS- INDV / Recrutement d'un Project Management, Individual consultant individuel chargé Pending IDA / 61320 Coordination, Monitoring and Post Consultant Limited 23,980.74 0.00 2021-09-13 2021-09-18 2021-09-28 2021-10-21 2021-11-30 de l'élaboration du rapport de Implementation Evaluation Selection la revue à mi-parcours du PDVIR Page 13 Supporting EUHC in Argentina (P163345) Argentina, IBRD/IDA, FY: 2018, Team Leader(s): Andrew Sunil Rajkumar, Vanina Camporeale, Requesting Unit: LCC7C, Responsible Unit: GHN04, Lending Instrument: Investment Project Financing Procurement All Plans MSAL Agencies Procurement All Plans MSAL Agencies  Implementation Type Procurement / Consultant Guidelines  Prior Review Contracts Processed Method Number Amount in US$ CDS 1 2,226,370.09 ICB 1 996,418.23 QCBS 10 31,888,713.70 RFB 33 59,339,195.58 RFQ 1 39,728.34  ISR Procurement Rating/Summary Moderately Satisfactory  Sort Rating Substantial No Data Available  Post Review Rating/Recommendation Number of Contracts Reviewed: 00002 Procurement Process Substantial [1 . Procurement team composition: it is recommended to transfer the responsibility of selecting and hiring individual consultants to the procurement area, leaving the management of contracts under the human resources area. If that is not possible, some appropriate, effective and efficient coordination mechanisms between the procurement and human resources areas should be considered for the management of the procurement plan and its implementation in an integrated manner., 2 . Filing of documentation: It is recommended to review the documentation of each process to ensure it is completed., 3 . Procurement plan: The plan must be kept up to date by reflecting any changes in planning. The processes must be executed under the conditions under which they are approved in that document. No processes should be initiated without being included in the Procurement Plan agreed with the bank., 4 . Publications: It is recommended to incorporate a copy of the publications in national newspapers and website for all the processes. With respect to the dates of publication on the website, it would be important to extract a copy of the publication on the day it was issued to record the actual date on which the milestone was fulfilled., 5 . Bidding documents: We recommend the application of the standard documents agreed with the bank for the national bidding processes, incorporating the necessary adjustments in each case. e.g. The inclusion of lots in the document., 6 . tiebreaker mechanism should be sought based on the information of the same offers (e.g. quality, delivery time, etc.).ommendedto record any conclusions of the evaluation committee in the relevant evaluation report. In the event of a tied result, ae characteristics of the good. The evaluation must be carried out based on the information provided by the bidders. It is also recBid Evaluation: it should be avoided to request information regarding the price of the offers and to visit the supplier to know th, 7 . Quality of documents: It is suggested to take note of the observations made in terms of quality of the documents, and to implement a review mechanism to avoid inconsistencies (e.g. differences between the amounts read at the opening of bids and those recordedin the evaluation report). In this sense, it is suggested to revise the observations referring to goods, works and non-consultancy services detailing all the aspects to be reviewed in the documents., 8 . Estimated amount: When a process is deserted because all bids exceed the estimated budget extensively, it is suggested to document the analysis of the budget and offers., 9 . Bid opening: it is suggested to refrain from postponing an opening of offers based on not having consultations in this regard., 10 . Contract signing: at the time of signing the contract, all the special clauses must be completed., 11 . Bid validity: It is recommended to establish a period of validity of offers without automatic renewal, because the bidder's confirmation is required to extend the offer., 12 . Individual consultants: following-up on prior reviews, the need to have evaluation criteria elaborated on the basis of each ofthe profiles of the required position is reiterated. Also, the profiles evaluated in each process must have the minimum profile required., 13 . Improvement plan: It is recommended to submit quarterly reports summarizing the progress of the improvement plan submitted by the UFIS at the time of this post-review., 14 . More information of each of the processes can be found detailed in the attached report.] View More Contract Administration Substantial [1 . The review of contract management developed in the period under analysis evidences the need to implement a contract tracking system to identify early alerts on: (i) delivery delays, (ii) compliance with contract conditions, (iii) changes in the delivery places, (iv) fulfillment of the contractual conditions. In this sense, it is advisable to incorporate a tool that allows the UFIS to develop this task and to support the programs in the correct administration of the contracts.] View More  Links Systems and Reports ProcurementBank Team Complaints Prior Review Contracts CRPD Website Red Flags Learning Tool Templates Procurement Plan Template Procurement Plan Document - 19-Nov-2017- Ver.1 Upload Reference and Support Complaints Manual AML Guidance Note Post Review Guidance Note PRAMS Manual Debarred Firms Temporary Suspended Firms ContactProcurement Systems Support OPRC Instructions and Form List of UNSPSC Codes Project PROCUREMENT Argentina : Supporting Effective Universal Health Coverage in Argentina PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2019-06-05 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163345 GPN Date: 2020-02-20 Project Name: Supporting Effective Universal Health Coverage in Argentina Loan / Credit No: IBRD / 88530 M Executing Agency(ies): inistry of Health WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-MSAL-111556-GO-RFB / Strengthening the Equipamiento para Institutional Capacity of the Single Stage - One IBRD / 88530 Prior Request for Bids Open - International 16,000,000.00 0.00 Canceled 2019-10-25 2019-11-09 2019-12-24 2020-03-17 2020-04-24 2020-07-23 diagnóstico y tratamiento National and Provincial Envelope inicial de IAM Ministries of Health Strengthening the AR-MSAL-111622-GO-RFB / Institutional Capacity of the Single Stage - One Adquisición de Suscripciones IBRD / 88530 Prior Request for Bids Open - National 2,500,000.00 0.00 Canceled 2019-04-23 2019-04-23 2019-04-23 2019-04-23 2019-05-25 2022-05-09 National and Provincial Envelope Red Hat Ministries of Health AR-MSAL-111557-GO-RFB / Strengthening the Equipamiento para Institutional Capacity of the Single Stage - One IBRD / 88530 Prior Request for Bids Open - National 4,565,000.00 0.00 Canceled 2019-07-10 2019-07-25 2019-08-29 2019-11-07 2019-12-06 2020-03-05 diagnóstico y tratamiento National and Provincial Envelope neonatal Ministries of Health Strengthening the AR-MSAL-111560-GO-RFB / Institutional Capacity of the Single Stage - One Licencias ORACLE IBRD / 88530 Post Request for Bids Open - National 500,000.00 0.00 Canceled 2019-09-09 2019-09-24 2019-10-29 2019-12-28 2020-01-22 2020-02-06 National and Provincial Envelope Interoperabilidad (SISA) Ministries of Health Strengthening the AR-MSAL-111559-GO-RFB / Institutional Capacity of the Single Stage - One IBRD / 88530 Post Request for Bids Open - National 500,000.00 0.00 Canceled 2019-07-10 2019-07-25 2019-08-29 2019-10-28 2019-11-22 2020-02-20 Servidor SISA ODA National and Provincial Envelope Ministries of Health Strengthening the Pending AR-MSAL-200454-GO-RFB / Institutional Capacity of the Single Stage - One IBRD / 88530 Post Request for Bids Open - National 4,800,000.00 0.00 Implementati 2020-11-18 2020-11-23 2021-01-04 2021-02-03 2021-03-10 2021-09-06 Adquisición de Angiógrafos National and Provincial Envelope on Ministries of Health AR-MSAL-200458-GO-RFB / Adquisición de equipamiento Strengthening the Under informático para Institutional Capacity of the Single Stage - One IBRD / 88530 Post Request for Bids Open - National 1,633,500.00 0.00 Implementati 2020-12-08 2021-04-23 2020-12-13 2021-01-24 2021-06-07 2021-02-23 2021-03-30 2021-09-26 interoperabilidad (Servidor National and Provincial Envelope on ODA y Licencias Oracle para Ministries of Health Nivel Central) AR-MSAL-200462-GO-RFB / Strengthening the Pending Equipamiento médico para Institutional Capacity of the Single Stage - One IBRD / 88530 Prior Request for Bids Open - International 11,863,100.00 0.00 Implementati 2021-01-20 2021-01-25 2021-03-08 2021-04-07 2021-05-12 2021-11-08 fortalecimiento de líneas de National and Provincial Envelope on cuidado SUMAR Ministries of Health Strengthening the AR-MSAL-200459-GO-RFB / Under Institutional Capacity of the Single Stage - One Adquisición de PC (5500 PC IBRD / 88530 Prior Request for Bids Open - International 9,340,000.00 0.00 Implementati 2021-01-18 2021-06-15 2021-01-23 2021-03-09 2021-03-19 2021-04-28 2021-06-12 National and Provincial Envelope all in one) on Ministries of Health AR-MSAL-111624-GO-RFB / Strengthening the Adquisición de equipamiento Institutional Capacity of the Single Stage - One IBRD / 88530 Post Request for Bids Open - International 3,900,000.00 0.00 Canceled 2019-04-23 2019-04-23 2019-05-06 2019-06-02 2019-06-28 2019-09-26 para diagnóstico por National and Provincial Envelope imágenes - Ecógrafos Ministries of Health NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening the AR-MSAL-111617-NC-RFQ / Institutional Capacity of the Request for Single Stage - One IBRD / 88530 Post Open - National 115,255.00 102,064.15 Signed 2019-04-30 2019-06-25 2021-03-29 2020-03-21 Plataforma E-Learning National and Provincial Quotations Envelope Ministries of Health AR-MSAL-190202-CS-CDS / Strengthening the Servicios profesionales RED Institutional Capacity of the Single Stage - One IBRD / 88530 Post Request for Bids Open - National 925,800.00 914,880.00 Signed 2020-11-10 2021-01-18 2020-11-15 2020-12-27 2021-02-12 2021-01-26 2021-04-08 2021-03-02 2021-05-28 2021-08-29 HAT para Red Nacional de National and Provincial Envelope Salud Ministries of Health AR-MSAL-200467-NC-RFB / Strengthening the Pending Capacitaciones para Institutional Capacity of the Single Stage - One IBRD / 88530 Post Request for Bids Open - National 127,000.00 0.00 Implementati 2020-11-25 2020-11-30 2021-01-11 2021-02-10 2021-03-17 2021-09-13 fortalecimiento de National and Provincial Envelope on programadores de sistemas Ministries of Health CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 AR-MSAL-111535-CS-QCBS Supporting Management, Quality And Cost- Under / Auditoria externa técnica IBRD / 88530 Prior Open - International 4,647,000.00 0.00 2019-07-29 2019-08-13 2019-09-12 2019-08-16 2019-10-09 2020-08-25 2019-11-08 2020-10-28 2019-12-07 2021-02-08 2020-02-01 2021-03-29 2020-03-10 2022-02-28 Monitoring and Evaluation Based Selection Implementation independiente AR-MSAL-111537-CS-QCBS / Proyecto de explotación de datos, análisis y divulgación Strengthening the de resultados del Estudio de Institutional Capacity of the Quality And Cost- Capacidad Prestacional de IBRD / 88530 Post Open - National 35,000.00 0.00 Canceled 2019-05-15 2019-06-14 2019-07-01 2019-07-31 2019-09-24 2019-10-28 2019-11-28 2020-05-26 National and Provincial Based Selection Establecimientos de Salud del Ministries of Health Sector Público y caracterización socio sanitaria de la Población AR-MSAL-111539-CS-QCBS Strengthening the / Evaluación de la Institutional Capacity of the Quality And Cost- implementación de un IBRD / 88530 Post Open - National 90,000.00 0.00 Canceled 2019-09-01 2019-09-16 2019-10-18 2019-11-17 2020-01-11 2020-02-14 2020-03-16 2021-06-09 National and Provincial Based Selection programa integral en Red para Ministries of Health la atención de IAM Strengthening the AR-MSAL-111543-CS-QCBS Institutional Capacity of the Quality And Cost- / Capacitación y armado de IBRD / 88530 Prior Open - National 1,210,000.00 0.00 Canceled 2019-08-20 2019-09-04 2019-10-28 2019-11-30 2019-12-29 2020-02-23 2020-04-01 2021-04-01 National and Provincial Based Selection plataforma de Red Hat Ministries of Health AR-MSAL-111550-CS-QCBS / Interoperabilidad paquetes Strengthening the de adopción provincial, Institutional Capacity of the Quality And Cost- IBRD / 88530 Prior Open - International 6,000,000.00 0.00 Canceled 2019-10-01 2019-10-16 2019-12-09 2020-01-11 2020-02-09 2020-04-05 2020-05-13 2021-05-13 implementación de HCE, National and Provincial Based Selection Estrategia digital, servicios Ministries of Health conectados, HL7, SNOMED AR-MSAL-200468-CS-QCBS / Ampliación de Strengthening the funcionalidades y Institutional Capacity of the Quality And Cost- Pending IBRD / 88530 Post Open - National 622,000.00 0.00 2021-02-17 2021-03-10 2021-04-23 2021-05-21 2021-06-20 2021-07-25 2021-08-29 2022-08-29 transferencias tecnológicas de National and Provincial Based Selection Implementation recursos de insumos críticos Ministries of Health de internación AR-MSAL-200469-CS-QCBS / App para dispositivos móviles (APP para dispositivos Strengthening the móviles que permitan el Institutional Capacity of the Quality And Cost- Pending vínculo entre el ministerio de IBRD / 88530 Post Open - National 598,000.00 0.00 2021-01-26 2021-02-16 2021-04-01 2021-04-29 2021-05-29 2021-07-03 2021-08-07 2022-08-07 National and Provincial Based Selection Implementation salud y los ciudadanos Ministries of Health aprovechando los datos reportados de los distintos programas) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-MSAL-112475-CS-INDV / Individual Supporting Management, Pending Consultor de Cobertura IBRD / 88530 Post Consultant Limited 102,832.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Prestacional (ECP) - (3) Selection AR-MSAL-112484-CS-INDV / Individual Supporting Management, Pending Coordinador Nacional (ECP) IBRD / 88530 Post Consultant Limited 69,415.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (1) Selection AR-MSAL-112490-CS-INDV / Individual Asistente Técnico de Supporting Management, Pending IBRD / 88530 Post Consultant Limited 29,503.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Cobertura Prestacional (ECP) Monitoring and Evaluation Implementation Selection (1) AR-MSAL-112489-CS-INDV / Individual Supporting Management, Pending Asesor del Coordinador IBRD / 88530 Post Consultant Limited 92,146.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Nacional (ECP) (2) Selection AR-MSAL-112492-CS-INDV / Individual Responsable de Supervisión y Supporting Management, Pending IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Auditoria de Cobertura Monitoring and Evaluation Implementation Selection Prestacional (ECP) (1) AR-MSAL-112493-CS-INDV / Individual Consultor para la Supporting Management, Pending IBRD / 88530 Post Consultant Limited 72,884.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Coordinación Nacional (ECP) Monitoring and Evaluation Implementation Selection (2) AR-MSAL-112494-CS-INDV / Individual Consultor de Supervisión y Supporting Management, Under IBRD / 88530 Post Consultant Limited 102,832.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2022-12-31 Auditoria de Cobertura Monitoring and Evaluation Implementation Selection Prestacional (ECP) (3) AR-MSAL-112496-CS-INDV / Individual Supporting Management, Responsable del FONAC (ECP) IBRD / 88530 Post Consultant Limited 46,073.00 4,061.06 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-08 2019-08-21 2019-08-16 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation (1) Selection AR-MSAL-112498-CS-INDV / Individual Supporting Management, Pending Consultor médico FONAC IBRD / 88530 Post Consultant Limited 68,555.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (ECP) (2) Selection AR-MSAL-112499-CS-INDV / Individual Supporting Management, Coordinador Operativo (ECP) IBRD / 88530 Post Consultant Limited 62,476.00 5,506.89 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-08 2019-08-21 2019-08-16 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation (1) Selection AR-MSAL-112500-CS-INDV / Individual Supporting Management, Pending Consultor técnico del FONAC IBRD / 88530 Post Consultant Limited 34,277.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (ECP) (1) Selection AR-MSAL-112501-CS-INDV / Individual Asistente Técnico para la Supporting Management, Pending IBRD / 88530 Post Consultant Limited 95,671.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Coordinación Operativa (ECP) Monitoring and Evaluation Implementation Selection (3) Page 2 AR-MSAL-112502-CS-INDV / Individual Supporting Management, Pending Asistente Administrativo de IBRD / 88530 Post Consultant Limited 59,007.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation FONAC (ECP) (2) Selection AR-MSAL-112503-CS-INDV / Coordinador del Área Individual integrada para el Supporting Management, Pending IBRD / 88530 Post Consultant Limited 55,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Fortalecimiento para la Monitoring and Evaluation Implementation Selection competencias de la Gestion Sanitaria (ECP) (1) AR-MSAL-112504-CS-INDV / Individual Coordinador del Área Cápitas Supporting Management, Pending IBRD / 88530 Post Consultant Limited 62,476.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 y gestion de la informacion Monitoring and Evaluation Implementation Selection (ECP) (1) AR-MSAL-112505-CS-INDV / Consultor para la Individual Supporting Management, Coordinación del Área IBRD / 88530 Post Consultant Limited 34,277.00 3,522.84 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-08 2019-08-21 2019-08-16 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Asistencia Técnica y Selection Capacitación (ECP) (1) AR-MSAL-112506-CS-INDV / Individual Supporting Management, Pending Asistente Administrativo de IBRD / 88530 Post Consultant Limited 23,592.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Área Cápitas (ECP) (1) Selection AR-MSAL-112507-CS-INDV / Individual Asistente Administrativo del Supporting Management, IBRD / 88530 Post Consultant Limited 27,505.00 2,603.16 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Área Asistencia Técnica y Monitoring and Evaluation Selection Capacitación (ECP) (1) AR-MSAL-112508-CS-INDV / Individual Supporting Management, Pending Responsable de Liquidación IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation de Cápitas (ECP) (1) Selection AR-MSAL-112509-CS-INDV / Individual Supporting Management, Pending Responsable de Capacitación IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (ECP) (1) Selection AR-MSAL-112510-CS-INDV / Individual Supporting Management, Pending Consultor de Liquidación de IBRD / 88530 Post Consultant Limited 72,884.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Cápitas (ECP) (2) Selection AR-MSAL-112511-CS-INDV / Individual Supporting Management, Pending Consultor de Capacitación y IBRD / 88530 Post Consultant Limited 68,555.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Asistencia Técnica (ECP) (2) Selection AR-MSAL-112514-CS-INDV / Individual Supporting Management, Pending Responsable de Asistencia IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Técnica (ECP) (1) Selection AR-MSAL-112513-CS-INDV / Individual Supporting Management, Pending Asistente Técnico de Gestión IBRD / 88530 Post Consultant Limited 59,007.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation de Padrones (ECP) (2) Selection AR-MSAL-112516-CS-INDV / Individual Asistente Técnico de Supporting Management, Pending IBRD / 88530 Post Consultant Limited 55,010.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Capacitación y Asistencia Monitoring and Evaluation Implementation Selection Técnica (ECP) (2) AR-MSAL-112517-CS-INDV / Individual Supporting Management, Pending Responsable del Área Gestion IBRD / 88530 Post Consultant Limited 55,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation de padrones (ECP) (1) Selection AR-MSAL-112520-CS-INDV / Individual Responsable de Conectividad, Supporting Management, Pending IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Seguridad y Tecnología (ECP) Monitoring and Evaluation Implementation Selection (1) AR-MSAL-112522-CS-INDV / Individual Supporting Management, Pending Consultor de Soporte Técnico IBRD / 88530 Post Consultant Limited 34,277.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (ECP) (1) Selection AR-MSAL-112523-CS-INDV / Individual Coordinador del Área Supporting Management, IBRD / 88530 Post Consultant Limited 55,538.00 4,900.22 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-08 2019-08-21 2019-08-16 2019-09-01 2019-09-01 2022-12-31 Planificación Operativa (ECP) Monitoring and Evaluation Selection (1) AR-MSAL-112525-CS-INDV / Individual Supporting Management, Pending Consultor Programador (ECP) IBRD / 88530 Post Consultant Limited 36,442.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (1) Selection AR-MSAL-112526-CS-INDV / Individual Asistente Administrativo del Supporting Management, IBRD / 88530 Post Consultant Limited 29,503.00 2,252.97 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Área Planificación Estratégica Monitoring and Evaluation Selection (ECP) (1) AR-MSAL-112527-CS-INDV / Individual Supporting Management, Under Asistente Técnico para IBRD / 88530 Post Consultant Limited 47,183.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-09-29 2019-08-21 2019-08-30 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Soporte Técnico (ECP) (2) Selection AR-MSAL-112528-CS-INDV / Individual Responsable de Supporting Management, Pending IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Fortalecimiento Estratégico de Monitoring and Evaluation Implementation Selection los SPS (ECP) (1) AR-MSAL-112529-CS-INDV / Individual Consultor de Fortalecimiento Supporting Management, Pending IBRD / 88530 Post Consultant Limited 68,555.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 de la Gestión de los SPS (ECP) Monitoring and Evaluation Implementation Selection (2) AR-MSAL-112530-CS-INDV / Individual Coordinador del area Supporting Management, IBRD / 88530 Post Consultant Limited 62,476.00 5,512.44 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-08 2019-08-21 2019-08-16 2019-09-01 2019-09-01 2022-12-31 integrada de Administración y Monitoring and Evaluation Selection Finanzas (ECP) (1) Page 3 AR-MSAL-112531-CS-INDV / Asistente Técnico para Individual Supporting Management, Pending Acompañamiento en la IBRD / 88530 Post Consultant Limited 59,007.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Implementación de los SPS Selection (ECP) (2) AR-MSAL-112532-CS-INDV / Individual Supporting Management, Coordinador de Área IBRD / 88530 Post Consultant Limited 55,538.00 4,900.22 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-08 2019-08-21 2019-08-16 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Administración (ECP) (1) Selection AR-MSAL-112533-CS-INDV / Individual Responsable de Monitoreo, Supporting Management, Pending IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Estadísticas y Reportes (ECP) Monitoring and Evaluation Implementation Selection (1) AR-MSAL-112534-CS-INDV / Individual Supporting Management, Asistente Administrativo del IBRD / 88530 Post Consultant Limited 31,890.00 2,426.84 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Área Administración (ECP) (1) Selection AR-MSAL-112535-CS-INDV / Individual Consultor de Monitoreo, Supporting Management, Pending IBRD / 88530 Post Consultant Limited 34,277.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Estadísticas y Reportes (ECP) Monitoring and Evaluation Implementation Selection (1) AR-MSAL-112536-CS-INDV / Individual Asistente Técnico de Supporting Management, Pending IBRD / 88530 Post Consultant Limited 29,503.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoreo, Estadísticas y Monitoring and Evaluation Implementation Selection Reportes (ECP) (1) AR-MSAL-112537-CS-INDV / Responsable de Individual Supporting Management, Pending Contrataciones y IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Adquisiciones de Bienes y Selection Servicios (ECP) (1) AR-MSAL-112538-CS-INDV / Coordinador del Área Individual Supporting Management, Pending Supervisión y Auditoría IBRD / 88530 Post Consultant Limited 55,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Administrativo - Financiera Selection (ECP) (1) AR-MSAL-112540-CS-INDV / Individual Supporting Management, Pending Consultor de Contrataciones y IBRD / 88530 Post Consultant Limited 72,884.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Adquisiciones (ECP) (2) Selection AR-MSAL-112539-CS-INDV / Individual Asistente Administrativo del Supporting Management, IBRD / 88530 Post Consultant Limited 29,503.00 2,603.16 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Área de Supervisión y Monitoring and Evaluation Selection Auditoría (ECP) (1) AR-MSAL-112541-CS-INDV / Individual Asistente Técnico para Supporting Management, Pending IBRD / 88530 Post Consultant Limited 31,890.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Contrataciones y Monitoring and Evaluation Implementation Selection Adquisiciones (ECP) (1) AR-MSAL-112542-CS-INDV / Individual Responsable de Supervisión Supporting Management, Pending IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Administrativo - Financiera Monitoring and Evaluation Implementation Selection (ECP) (1) AR-MSAL-112543-CS-INDV / Individual Supporting Management, Pending Responsable de Gestion y IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Seguimiento de RRHH (ECP) Selection (1) AR-MSAL-112544-CS-INDV / Individual Consultor Analista Supporting Management, Pending IBRD / 88530 Post Consultant Limited 34,277.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Administrativo - Financiero Monitoring and Evaluation Implementation Selection (ECP) (1) AR-MSAL-112545-CS-INDV / Individual Supporting Management, Pending Consultor de Gestion y IBRD / 88530 Post Consultant Limited 36,442.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Seguimiento de RRHH (ECP) Selection (1) AR-MSAL-112546-CS-INDV / Individual Asistente Técnico para Supporting Management, Pending IBRD / 88530 Post Consultant Limited 29,503.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Analista Administrativo - Monitoring and Evaluation Implementation Selection Financiero (ECP) (1) AR-MSAL-112547-CS-INDV / Individual Asistente Técnico de Gestion Supporting Management, Pending IBRD / 88530 Post Consultant Limited 31,890.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 y Seguimiento de RRHH (ECP) Monitoring and Evaluation Implementation Selection (1) AR-MSAL-112548-CS-INDV / Individual Responsable de Auditoría Supporting Management, Pending IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Financiera y de Gestión (ECP) Monitoring and Evaluation Implementation Selection (1) AR-MSAL-112549-CS-INDV / Individual Supporting Management, Asistencia Técnica para IBRD / 88530 Post Consultant Limited 59,007.00 7,052.78 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Auditoría en Terreno (ECP) (2) Selection AR-MSAL-112550-CS-INDV / Individual Supporting Management, Pending Asistencia Técnica para IBRD / 88530 Post Consultant Limited 59,007.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Auditoría en Terreno (ECP) (2) Selection AR-MSAL-112551-CS-INDV / Individual Supporting Management, Pending Responsable de Finanzas IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (ECP) (1) Selection AR-MSAL-112552-CS-INDV / Individual Coordinador de Área Supporting Management, Pending IBRD / 88530 Post Consultant Limited 55,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Integrada de Produccion de Monitoring and Evaluation Implementation Selection contenidos (ECP) (1) AR-MSAL-112554-CS-INDV / Individual Supporting Management, Pending Responsable de Comunicación IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Institucional (ECP) (1) Selection Page 4 AR-MSAL-112555-CS-INDV / Individual Supporting Management, Consultor en Comunicación IBRD / 88530 Post Consultant Limited 63,781.00 6,029.15 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Institucional (ECP) (2) Selection AR-MSAL-112556-CS-INDV / Individual Supporting Management, Pending Responsable de Producción de IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Contenidos (ECP) (1) Selection AR-MSAL-112557-CS-INDV / Individual Supporting Management, Pending Consultor en Producción de IBRD / 88530 Post Consultant Limited 95,671.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Contenidos (ECP) (3) Selection AR-MSAL-112558-CS-INDV / Individual Supporting Management, Pending Coordinador de Área Legal IBRD / 88530 Post Consultant Limited 55,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Integrada (ECP) (1) Selection AR-MSAL-112559-CS-INDV / Individual Supporting Management, Pending Asistente Administrativo de IBRD / 88530 Post Consultant Limited 59,007.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Área Legal (ECP) (2) Selection AR-MSAL-112562-CS-INDV / Individual Responsable de Supporting Management, Pending IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Asesoramiento Técnico Legal Monitoring and Evaluation Implementation Selection (ECP) (1) AR-MSAL-112561-CS-INDV / Individual Supporting Management, Pending Consultor de Planificación IBRD / 88530 Post Consultant Limited 36,442.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Presupuestaria (ECP) (1) Selection Individual AR-MSAL-112563-CS-INDV / Supporting Management, Under IBRD / 88530 Post Consultant Limited 68,555.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Consultor Legal (ECP) (2) Monitoring and Evaluation Implementation Selection AR-MSAL-112564-CS-INDV / Individual Coordinador de Área Supporting Management, Pending IBRD / 88530 Post Consultant Limited 55,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Cobertura Prestacional (ECP) Monitoring and Evaluation Implementation Selection (1) AR-MSAL-112565-CS-INDV / Consultor para la Individual Supporting Management, Pending Coordinación del Área IBRD / 88530 Post Consultant Limited 34,277.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Cobertura Prestacional (ECP) Selection (1) AR-MSAL-112566-CS-INDV / Individual Supporting Management, Pending Consultor de Cuentas a Pagar IBRD / 88530 Post Consultant Limited 72,884.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (ECP) (2) Selection AR-MSAL-112568-CS-INDV / Individual Asistente Administrativo del Supporting Management, Pending IBRD / 88530 Post Consultant Limited 29,503.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Área de Cobertura Monitoring and Evaluation Implementation Selection Prestacional (ECP) (1) AR-MSAL-112569-CS-INDV / Individual Supporting Management, Pending Asistente Técnico de Cuentas IBRD / 88530 Post Consultant Limited 29,503.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation a Pagar (ECP) (1) Selection AR-MSAL-112570-CS-INDV / Individual Supporting Management, Pending Responsable de Cobertura IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Prestacional (ECP) (1) Selection AR-MSAL-112572-CS-INDV / Individual Supporting Management, Pending Responsable de Evaluación IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Estratégica (ECP) (1) Selection AR-MSAL-112573-CS-INDV / Individual Supporting Management, Pending Consultor de Evaluación de IBRD / 88530 Post Consultant Limited 34,277.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Impacto (ECP) (1) Selection AR-MSAL-112574-CS-INDV / Individual Supporting Management, Consultor de Evaluación IBRD / 88530 Post Consultant Limited 34,277.00 3,526.39 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Estratégica (ECP) (1) Selection AR-MSAL-112575-CS-INDV / Individual Supporting Management, Pending Responsable de Evaluacion e IBRD / 88530 Post Consultant Limited 46,073.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Investigación (ECP) (1) Selection AR-MSAL-112576-CS-INDV / Individual Supporting Management, Consultor de Evaluacion e IBRD / 88530 Post Consultant Limited 34,277.00 3,526.39 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Investigación (ECP) (1) Selection AR-MSAL-112577-CS-INDV / Individual Supporting Management, Pending Coordiandor de Gestión IBRD / 88530 Post Consultant Limited 55,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Clinica (ECP) (1) Selection AR-MSAL-112579-CS-INDV / Individual Supporting Management, Under Consultor de Gestión de IBRD / 88530 Post Consultant Limited 68,555.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-08 2019-08-21 2019-08-16 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Resultados de Salud (ECP) (2) Selection AR-MSAL-112582-CS-INDV / Coordinador del Área Individual Supporting Management, Produciion de Contenidos, IBRD / 88530 Post Consultant Limited 72,884.00 7,105.99 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Fortalec. Competencias y Selection Salvaguardas (2) AR-MSAL-112584-CS-INDV / Individual Supporting Management, Pending Coordinador Planificación IBRD / 88530 Post Consultant Limited 72,884.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Operativa (2) Selection AR-MSAL-112583-CS-INDV / Consultor de monitoreo y Individual Supporting Management, Pending seguimiento de la gestion de IBRD / 88530 Post Consultant Limited 68,555.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation recupero de costos provincial Selection (ECP) (2) AR-MSAL-112585-CS-INDV / Individual Supporting Management, Under Asistente Administrativo del IBRD / 88530 Post Consultant Limited 95,671.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Área Administración (3) Selection Page 5 AR-MSAL-112586-CS-INDV / Individual Asistente Técnico de Gestión Supporting Management, Pending IBRD / 88530 Post Consultant Limited 29,503.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 de Resultados del recupero Monitoring and Evaluation Implementation Selection (ECP) (1) Individual AR-MSAL-112587-CS-INDV / Supporting Management, Under IBRD / 88530 Post Consultant Limited 1,105,756.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Coordinador Provincial (24) Monitoring and Evaluation Implementation Selection AR-MSAL-112588-CS-INDV / Individual Supporting Management, Pending Consultor Analista de Control IBRD / 88530 Post Consultant Limited 63,781.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Administrativo Financiero (2) Selection AR-MSAL-112589-CS-INDV / Individual Supporting Management, Under Coordinador del Área IBRD / 88530 Post Consultant Limited 874,613.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Administración (24) Selection AR-MSAL-112591-CS-INDV / Individual Supporting Management, Under Asistente Técnico para IBRD / 88530 Post Consultant Limited 63,781.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Soporte Técnico (2) Selection AR-MSAL-112594-CS-INDV / Individual Asistente Administrativo del Supporting Management, Pending IBRD / 88530 Post Consultant Limited 31,890.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Área Cobertura Prestacional Monitoring and Evaluation Implementation Selection (1) AR-MSAL-112593-CS-INDV / Individual Supporting Management, Under Asistente Técnico de IBRD / 88530 Post Consultant Limited 815,190.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Administración (29) Selection AR-MSAL-112595-CS-INDV / Individual Asistente Administrativo del Supporting Management, Pending IBRD / 88530 Post Consultant Limited 55,010.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Área de Auditoría y Monitoring and Evaluation Implementation Selection Supervisión (2) AR-MSAL-112597-CS-INDV / Individual Supporting Management, Pending Asistente Administrativo de IBRD / 88530 Post Consultant Limited 31,890.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Planificación Operativa (1) Selection AR-MSAL-112596-CS-INDV / Individual Supporting Management, Under Coordinador del Área IBRD / 88530 Post Consultant Limited 874,613.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Auditoria y Supervisión (24) Selection AR-MSAL-112598-CS-INDV / Individual Asistente Técnico Supporting Management, IBRD / 88530 Post Consultant Limited 27,505.00 2,809.07 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Administrativo del Área Legal Monitoring and Evaluation Selection (1) AR-MSAL-112599-CS-INDV / Coordinador del Área de Fort. Individual Supporting Management, Pending De las Competencias para la IBRD / 88530 Post Consultant Limited 72,884.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation gestion sanitaria y Selection Salvaguardas (2) AR-MSAL-112600-CS-INDV / Individual Supporting Management, Under Asistente Técnico de Auditoría IBRD / 88530 Post Consultant Limited 880,164.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation y Supervisión (32) Selection AR-MSAL-112601-CS-INDV / Individual Supporting Management, Under Coordinador del Área Legal IBRD / 88530 Post Consultant Limited 874,613.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (24) Selection AR-MSAL-112602-CS-INDV / Individual Supporting Management, Under Consultor para Área de IBRD / 88530 Post Consultant Limited 127,562.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Administración (4) Selection AR-MSAL-112604-CS-INDV / Individual Supporting Management, Pending Consultor de Área Cobertura IBRD / 88530 Post Consultant Limited 127,562.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Prestacional (4) Selection AR-MSAL-112605-CS-INDV / Individual Supporting Management, Under Coordinador del Área IBRD / 88530 Post Consultant Limited 801,729.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Planificación Operativa (22) Selection AR-MSAL-112606-CS-INDV / Individual Supporting Management, Coordinador de evaluacion e IBRD / 88530 Post Consultant Limited 55,538.00 4,900.22 Signed 2019-08-12 2019-09-12 2019-08-19 2019-08-08 2019-08-21 2019-08-16 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation Investigacion (ECP) (1) Selection AR-MSAL-112609-CS-INDV / Individual Supporting Management, Under Referente Regional de UGSP IBRD / 88530 Post Consultant Limited 275,051.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation (10) Selection AR-MSAL-112608-CS-INDV / Individual Supporting Management, Under Asistente Técnico de IBRD / 88530 Post Consultant Limited 929,596.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Planificación Operativa (33) Selection AR-MSAL-112610-CS-INDV / Individual Supporting Management, Pending Consultor de Gestion Clinica y IBRD / 88530 Post Consultant Limited 72,884.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation seguimiento (ECP) (2) Selection AR-MSAL-112611-CS-INDV / Individual Supporting Management, Asistente Técnico de Gestión IBRD / 88530 Post Consultant Limited 29,503.00 2,426.84 Signed 2019-08-12 2019-09-12 2019-08-19 2019-09-29 2019-08-21 2019-08-30 2019-09-01 2019-09-01 2022-12-31 Monitoring and Evaluation de Resultados (ECP) (1) Selection AR-MSAL-112613-CS-INDV / Individual Supporting Management, Under Coordinador del Área IBRD / 88530 Post Consultant Limited 874,613.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Cobertura Prestacional (24) Selection AR-MSAL-112614-CS-INDV / Individual Supporting Management, Under Consultor del Área IBRD / 88530 Post Consultant Limited 191,342.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Planificación Operativa (6) Selection AR-MSAL-112615-CS-INDV / Individual Supporting Management, Pending Coordinador de Recupero de IBRD / 88530 Post Consultant Limited 55,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Costos (ECP) (1) Selection Page 6 AR-MSAL-112616-CS-INDV / Asistente Técnico de Fort. De Individual Supporting Management, Under las Competencias para la IBRD / 88530 Post Consultant Limited 385,072.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation gestion sanitaria y Selection Salvaguardas (14) AR-MSAL-112617-CS-INDV / Individual Supporting Management, Pending Consultor de Gestión de IBRD / 88530 Post Consultant Limited 72,884.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Recupero de Costos (ECP) (2) Selection AR-MSAL-112618-CS-INDV / Individual Supporting Management, Under Asistente Técnico del Área IBRD / 88530 Post Consultant Limited 1,190,298.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Cobertura Prestacional (42) Selection AR-MSAL-112619-CS-INDV / Técnico experto de apoyo Strengthening the para Gestión de Registros Individual Institutional Capacity of the Pending clínicos electrónicos, Historia IBRD / 88530 Post Consultant Limited 359,704.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 National and Provincial Implementation Clínica Electrónica e Selection Ministries of Health Interoperabilidad de sistemas de información (9) AR-MSAL-112620-CS-INDV / Individual Supporting Management, Under Coordinador del Área Prod. de IBRD / 88530 Post Consultant Limited 801,729.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Contenidos e Informacion (22) Selection AR-MSAL-112623-CS-INDV / Strengthening the Individual Consultor Experto en Institutional Capacity of the Pending IBRD / 88530 Post Consultant Limited 159,868.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Asistencia Operativa a National and Provincial Implementation Selection Provincias (4) Ministries of Health AR-MSAL-112624-CS-INDV / Coordinador del Área Fort. De Individual Supporting Management, Under las Competencias para la IBRD / 88530 Post Consultant Limited 728,844.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation gestion sanitaria y Selection Salvaguardas (20) Strengthening the AR-MSAL-112625-CS-INDV / Individual Institutional Capacity of the Pending Consultor de Apoyo IBRD / 88530 Post Consultant Limited 31,890.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 National and Provincial Implementation administrativo a la DNSIS (1) Selection Ministries of Health AR-MSAL-112626-CS-INDV / Individual Coordinador del Área Cápitas Supporting Management, Under IBRD / 88530 Post Consultant Limited 874,613.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 y Sistemas de Información Monitoring and Evaluation Implementation Selection (24) AR-MSAL-112628-CS-INDV / Individual Supporting Management, Under Asistente Técnico para IBRD / 88530 Post Consultant Limited 485,128.00 0.00 2019-08-12 2019-09-12 2019-08-19 2019-08-29 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Programador (17) Selection AR-MSAL-112629-CS-INDV / Consultor para el Individual Supporting Management, Pending Fortalecimiento de IBRD / 88530 Prior Consultant Limited 612,829.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Indicadores sanitarios del Selection Programa PACES (24) AR-MSAL-112630-CS-INDV / Individual Supporting Management, Pending Consultor Facilitador IBRD / 88530 Prior Consultant Limited 919,243.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Programa PACES (36) Selection AR-MSAL-112631-CS-INDV / Individual Supporting Management, Pending Asistente Tecnico Facilitador IBRD / 88530 Post Consultant Limited 499,589.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation UIP Programa PACES (24) Selection AR-MSAL-112632-CS-INDV / Individual Asistente Técnico del Área Supporting Management, Pending IBRD / 88530 Post Consultant Limited 357,567.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Prod. de Contenidos e Monitoring and Evaluation Implementation Selection Informacion (13) AR-MSAL-112633-CS-INDV / Individual Consultor para el Supporting Management, Pending IBRD / 88530 Post Consultant Limited 291,538.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 fortalecimiento e integracion Monitoring and Evaluation Implementation Selection de programas (ECP) (8) AR-MSAL-112635-CS-INDV / Individual Supporting Management, Pending Consultor Implementación IBRD / 88530 Post Consultant Limited 145,769.00 0.00 2029-08-12 2029-08-19 2029-08-21 2029-09-01 2032-12-31 Monitoring and Evaluation Implementation CUS (ECP) (4) Selection AR-MSAL-112637-CS-INDV / Individual Supporting Management, Pending Consultor Facilitador ECP IBRD / 88530 Post Consultant Limited 109,327.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Implementation Microgestión (ECP) (3) Selection Strengthening the AR-MSAL-112639-CS-INDV / Individual Institutional Capacity of the Pending Consultor para Recupeo de IBRD / 88530 Prior Consultant Limited 638,363.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 National and Provincial Implementation costos (25) Selection Ministries of Health AR-MSAL-112641-CS-INDV / Strengthening the Individual Asistencia Técnica para Institutional Capacity of the Pending IBRD / 88530 Prior Consultant Limited 645,302.00 0.00 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 herramientas informáticas National and Provincial Implementation Selection Programa PACES (31) Ministries of Health Strengthening the AR-MSAL-129570-CS-INDV- Individual Institutional Capacity of the Pending CDCU / Coordinador del Área IBRD / 88530 Post Consultant Direct 27,363.00 0.00 2019-12-30 2019-12-30 2019-12-30 2020-01-01 2022-12-31 National and Provincial Implementation Administración y Finanzas (1) Selection Ministries of Health AR-MSAL-129579-CS-INDV- Strengthening the Individual CDCU / Coordinador del Área Institutional Capacity of the Pending IBRD / 88530 Post Consultant Direct 27,363.00 0.00 2019-12-30 2019-12-30 2019-12-30 2020-01-01 2022-12-31 Planificación Operativa y National and Provincial Implementation Selection Monitoreo (1) Ministries of Health Strengthening the AR-MSAL-129584-CS-INDV- Individual Institutional Capacity of the Pending CDCU / Coordinador del Área IBRD / 88530 Post Consultant Direct 27,363.00 0.00 2019-12-30 2019-12-30 2019-12-30 2020-01-01 2022-12-31 National and Provincial Implementation Cobertura Prestacional (1) Selection Ministries of Health Page 7 Strengthening the AR-MSAL-129585-CS-INDV- Individual Institutional Capacity of the Pending CDCU / Coordinador del Área IBRD / 88530 Post Consultant Direct 27,363.00 0.00 2019-12-30 2019-12-30 2019-12-30 2020-01-01 2022-12-31 National and Provincial Implementation Cobertura Prestacional (1) Selection Ministries of Health AR-MSAL-129586-CS-INDV- Strengthening the CDCU / Coordinador del Área Individual Institutional Capacity of the Pending Fortalecimiento de las IBRD / 88530 Post Consultant Direct 27,363.00 0.00 2019-12-30 2019-12-30 2019-12-30 2020-01-01 2022-12-31 National and Provincial Implementation Competencias para la Gestión Selection Ministries of Health Sanitaria y Salvaguardas (1) AR-MSAL-129587-CS-INDV- Strengthening the Individual CDCU / Coordinador de Institutional Capacity of the Pending IBRD / 88530 Post Consultant Direct 27,363.00 0.00 2019-12-30 2019-12-30 2019-12-30 2020-01-01 2022-12-31 Supervisión y Auditoría National and Provincial Implementation Selection Administrativo - Financiera (1) Ministries of Health AR-MSAL-129588-CS-INDV- Strengthening the Individual CDCU / Coordinador de Institutional Capacity of the Pending IBRD / 88530 Post Consultant Direct 27,363.00 0.00 2019-12-30 2019-12-30 2019-12-30 2020-01-01 2022-12-31 Supervisión y Auditoría National and Provincial Implementation Selection Administrativo - Financiera (1) Ministries of Health AR-MSAL-129593-CS-INDV- Strengthening the Individual CDCU / Coordinador del Área Institutional Capacity of the Pending IBRD / 88530 Post Consultant Direct 46,911.00 0.00 2019-12-30 2019-12-30 2019-12-30 2020-01-01 2022-12-31 Cápitas y Gestión de la National and Provincial Implementation Selection Información (ECP) (1) Ministries of Health AR-MSAL-112497-CS-INDV / Individual Supporting Management, Asesor Administrativo IBRD / 88530 Post Consultant Limited 34,277.00 0.00 Canceled 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Financiero del FONAC (ECP) Selection (1) AR-MSAL-112495-CS-INDV / Individual Asistente de Supervisión y Supporting Management, IBRD / 88530 Post Consultant Limited 59,007.00 0.00 Canceled 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Auditoria de Cobertura Monitoring and Evaluation Selection Prestacional (ECP) (2) Strengthening the AR-MSAL-112622-CS-INDV / Individual Institutional Capacity of the Consultor Técnico en IBRD / 88530 Post Consultant Limited 109,327.00 0.00 Canceled 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 National and Provincial sistemas DNSIS (3) Selection Ministries of Health AR-MSAL-112607-CS-INDV / Individual Supporting Management, Consultor de Auditoría y IBRD / 88530 Post Consultant Limited 63,781.00 0.00 Canceled 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Supervisión (2) Selection AR-MSAL-112521-CS-INDV / Individual Consultor de Pueblos Supporting Management, IBRD / 88530 Post Consultant Limited 34,277.00 0.00 Canceled 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Indígenas y Otros Grupos Monitoring and Evaluation Selection Priorizados (ECP) (1) AR-MSAL-112519-CS-INDV / Individual Supporting Management, Consultor de Salvaguarda IBRD / 88530 Post Consultant Limited 34,277.00 0.00 Canceled 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation ambiental (ECP) (1) Selection AR-MSAL-112524-CS-INDV / Consultor para la Individual Supporting Management, Coordinación de Área IBRD / 88530 Post Consultant Limited 34,277.00 0.00 Canceled 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation Planificación Estratégica (ECP) Selection (1) AR-MSAL-112518-CS-INDV / Individual Supporting Management, Responsable de Salvaguardas IBRD / 88530 Post Consultant Limited 46,073.00 0.00 Canceled 2019-08-12 2019-08-19 2019-08-21 2019-09-01 2022-12-31 Monitoring and Evaluation (ECP) (1) Selection AR-MSAL-169914-CS-INDV / Individual Supporting Management, Pending Consultor de Gestión de IBRD / 88530 Post Consultant Open 24,805.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Monitoring and Evaluation Implementation Resultados en Salud (1) Selection AR-MSAL-169922-CS-INDV / Individual Supporting Management, Pending Consultor de Planificación IBRD / 88530 Post Consultant Open 21,274.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Monitoring and Evaluation Implementation operativa y monitoreo (1) Selection AR-MSAL-169923-CS-INDV / Individual Supporting Management, Pending Coordinador del Área IBRD / 88530 Post Consultant Open 22,617.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Monitoring and Evaluation Implementation Administración y Finanzas (1) Selection AR-MSAL-169928-CS-INDV / Individual Supporting Management, Pending Coordinador del Área IBRD / 88530 Post Consultant Open 22,617.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Monitoring and Evaluation Implementation Cobertura Prestacional (1) Selection AR-MSAL-169929-CS-INDV / Individual Supporting Management, Pending Coordinador del Área de IBRD / 88530 Post Consultant Open 34,469.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Monitoring and Evaluation Implementation Evaluación e Investigación (1) Selection AR-MSAL-169930-CS-INDV / Coordinador del Área Individual integrada para el Supporting Management, Pending IBRD / 88530 Post Consultant Open 38,775.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Fortalecimiento de las Monitoring and Evaluation Implementation Selection competencias para la Gestión Sanitaria (1) AR-MSAL-169935-CS-INDV / Individual Coordinador del Área Supporting Management, Pending IBRD / 88530 Post Consultant Open 34,469.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Planificación Operativa y Monitoring and Evaluation Implementation Selection Monitoreo (ECP) (1) AR-MSAL-169937-CS-INDV / Individual Supporting Management, Pending Coordinador del Área Técnico IBRD / 88530 Post Consultant Open 22,617.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Monitoring and Evaluation Implementation - Jurídica (1) Selection Individual AR-MSAL-169938-CS-INDV / Supporting Management, Pending IBRD / 88530 Post Consultant Open 57,189.00 0.00 2020-04-22 2020-04-25 2020-04-26 2020-04-28 2022-12-31 Coordinador Jurisdiccional (2) Monitoring and Evaluation Implementation Selection AR-MSAL-173935-CS-INDV / Individual Supporting Management, Pending Coordinador del Área Alta IBRD / 88530 Post Consultant Open 32,434.00 0.00 2020-05-22 2020-05-25 2020-05-26 2020-05-28 2022-12-31 Monitoring and Evaluation Implementation Complejidad (1) Selection Page 8 Individual AR-MSAL-173936-CS-INDV / Supporting Management, Pending IBRD / 88530 Post Consultant Open 28,852.00 0.00 2020-05-22 2020-05-25 2020-05-26 2020-05-28 2022-12-31 Responsable de Finanzas (1) Monitoring and Evaluation Implementation Selection AR-MSAL-187968-CS-INDV / Individual Supporting Management, Pending Consultoría: Staff Técnico de IBRD / 88530 Post Consultant Open 15,411.00 0.00 2020-08-07 2020-08-10 2020-08-11 2020-09-01 2022-12-31 Monitoring and Evaluation Implementation la DNSIS (1) Selection AR-MSAL-205132-CS-CDS / Supporting Management, Adquisición de Capacitaciones IBRD / 88530 Post Direct Selection Direct 16,403.00 16,686.00 Signed 2021-01-11 2021-04-19 2021-01-21 2020-11-17 2021-02-19 2021-04-19 2021-10-17 Monitoring and Evaluation en HL7 AR-MSAL-214552-CS-CQS / Individual Supporting Management, Pending Consultor de Auditoría en IBRD / 88530 Post Consultant Open 42,653.00 0.00 2021-05-09 2021-05-12 2021-05-13 2021-05-15 2022-12-31 Monitoring and Evaluation Implementation Terreno (4) Selection AR-MSAL-222382-CS-CQS / Individual Supporting Management, Pending Consultor de Evaluación de IBRD / 88530 Post Consultant Open 13,649.00 0.00 2021-05-09 2021-05-12 2021-05-13 2021-05-15 2022-12-31 Monitoring and Evaluation Implementation Impacto (1) Selection AR-MSAL-222383-CS-CQS / Individual Supporting Management, Pending Consultor de Evaluación IBRD / 88530 Post Consultant Open 13,649.00 0.00 2021-05-09 2021-05-12 2021-05-13 2021-05-15 2022-12-31 Monitoring and Evaluation Implementation Estratégica (1) Selection AR-MSAL-222377-CS-CQS / Individual Asistente de Supervisión y Supporting Management, Pending IBRD / 88530 Post Consultant Open 11,706.00 0.00 2021-05-09 2021-05-12 2021-05-13 2021-05-15 2022-12-31 Auditoría de Cobertura Monitoring and Evaluation Implementation Selection Prestacional (1) AR-MSAL-222381-CS-CQS / Individual Supporting Management, Pending Asistente Técnico de Gestión IBRD / 88530 Post Consultant Open 11,706.00 0.00 2021-05-09 2021-05-12 2021-05-13 2021-05-15 2022-12-31 Monitoring and Evaluation Implementation de Resultados en salud (1) Selection Individual AR-MSAL-222385-CS-CQS / Supporting Management, Pending IBRD / 88530 Post Consultant Open 27,297.00 0.00 2021-05-09 2021-05-12 2021-05-13 2021-05-15 2022-12-31 Consultor de Investigación (2) Monitoring and Evaluation Implementation Selection Individual AR-MSAL-214554-CS-CQS / Supporting Management, Pending IBRD / 88530 Post Consultant Open 10,663.00 0.00 2021-05-09 2021-05-12 2021-05-13 2021-05-15 2022-12-31 Consultor de Capacitación (1) Monitoring and Evaluation Implementation Selection Individual AR-MSAL-214663-CS-CQS / Supporting Management, Pending IBRD / 88530 Post Consultant Open 11,706.00 0.00 2021-05-09 2021-05-12 2021-05-13 2021-05-15 2022-12-31 Staff Técnico de la DNSIS (1) Monitoring and Evaluation Implementation Selection Individual AR-MSAL-236591-CS-INDV / Supporting Management, Pending IBRD / 88530 Post Consultant Open 22,429.00 0.00 2021-06-25 2021-06-28 2021-06-29 2021-07-01 2022-12-31 Coordinador Operativo (1) Monitoring and Evaluation Implementation Selection AR-MSAL-236592-CS-INDV / Individual Supporting Management, Pending Responsable Supervisión IBRD / 88530 Post Consultant Open 17,736.00 0.00 2021-06-25 2021-06-28 2021-06-29 2021-07-01 2022-12-31 Monitoring and Evaluation Implementation Administrativo - Financiera (1) Selection AR-MSAL-236593-CS-INDV / Individual Supporting Management, Pending Consultor técnico del Área IBRD / 88530 Post Consultant Open 28,697.00 0.00 2021-06-25 2021-06-28 2021-06-29 2021-07-01 2022-12-31 Monitoring and Evaluation Implementation Alta Complejidad (2) Selection Page 9 PROCUREMENT PLAN (Textual Part) Project information: Tuvalu Maritime Investment in Climate Resilient Operations Project Implementation agency: The Ministry of Communications and Transport (MCT) Date of the Procurement Plan: 18 Nov. 2018 Period covered by this Procurement Plan: from 2018 to 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. At this stage, no contracts are expected to be procured by approaching the national market. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works) – not applicable. PROCUREMENT Tuvalu : Maritime Investment in Climate Resilient Operations PLAN General Information Country: Tuvalu Bank’s Approval Date of the Original Procurement Plan: 2019-01-22 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161540 GPN Date: Project Name: Maritime Investment in Climate Resilient Operations Loan / Credit No: IDA / V0750, IDA / D4100 Ministry of Public Works, Infrastructure, Environment, Labour, Metrology and Disaster. Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned TV-MOCT-86551-CW-RFB / Component 2: Climate Single Stage - One 15,000,000.0 2020-09- Maritime Infrastructure and IDA / V0750 Resilient Maritime Prior Request for Bids Open - International 0.00 Canceled 2019-08-01 2019-08-31 2019-10-12 2019-10-20 2019-11-03 Envelope 0 27 Equipment on Nanumaga Infrastructure Solutions MCT-MICW-004 / Component 2: Climate Infrastructure Investments Single Stage - One 2019-12- IDA / V0750 Resilient Maritime Prior Request for Bids Open - International 3,500,000.00 0.00 Canceled 2019-02-25 2019-03-02 2019-04-01 2019-05-01 2019-06-05 and Operational Equipment on Envelope 02 Infrastructure Solutions Funafuti TV-MOCT-135093-CW-RFB / Request for Bids - Component 2: Climate Pending Maritime Investments (works Single Stage - One Works (without 18,500,000.0 2020-08- IDA / V0750 Resilient Maritime Prior Request for Bids Open - International 0.00 Implementat 2019-10-10 2019-10-15 2019-12-14 2020-01-13 2020-02-17 and equipment) in Nanumaga Envelope prequalification) 0 15 Infrastructure Solutions ion and Funafuti SPD GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TV-MOCT-86566-GO-RFQ / Component 3: Strengthening Request for Single Stage - One IDA / V0750 Post Open - National 100,000.00 0.00 Canceled 2019-04-10 2019-06-05 2019-12-02 Office Equipment / Supplies the Enabling Envrionment Quotations Envelope TV-MPWIELMD-226326-GO- Component 4: Contingency UN Agencies UN / CERC: "Medical IDA / D4100 Prior Direct 1,600,000.00 1,600,000.00 Signed 2021-04-01 2021-05-11 2021-04-06 2021-05-19 2021-05-13 2021-05-26 2021-11-09 Emergency Response (Direct) Equipment and Supply" NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MCT-MICCS-006 / Component 3: Strengthening Quality And Cost- IDA / V0750 Prior Open - International 1,000,000.00 0.00 Under Review 2019-03-31 2019-09-03 2019-04-10 2020-03-22 2019-06-19 2021-03-02 2019-07-17 2019-08-14 2019-09-25 2019-10-16 2020-10-15 Supervision Services the Enabling Envrionment Based Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual MCT-MICCS-001 / GIS Based Component 1: Sectoral and IDA / V0750 Post Consultant Open 30,000.00 30,000.00 Signed 2019-03-31 2020-08-20 2019-05-19 2020-11-26 2019-06-09 2021-02-24 2019-07-14 2021-03-01 2020-01-10 Mapping Spatial Planning Tools Selection Individual TV-MOCT-86548-CS-INDV / Component 1: Sectoral and IDA / V0750 Post Consultant Open 20,000.00 19,402.00 Signed 2019-03-31 2020-08-20 2019-05-19 2020-12-11 2019-06-09 2020-12-20 2019-07-14 2021-01-04 2020-01-10 Health Outreach Campaign Spatial Planning Tools Selection Individual MCT-MICCS-008 / GBV,VAC Component 3: Strengthening IDA / V0750 Post Consultant Open 100,000.00 0.00 Under Review 2019-03-31 2021-03-24 2019-05-19 2019-06-09 2019-07-14 2020-01-10 and Trafficking Strategy the Enabling Envrionment Selection Individual MCT-MICCS-007 / Maritime Component 3: Strengthening Under IDA / V0750 Post Consultant Open 200,000.00 0.00 2019-03-31 2021-02-17 2019-05-19 2019-06-09 2019-07-22 2020-01-18 Advisor the Enabling Envrionment Implementation Selection TV-MOCT-97196-CS-INDV / Procurement Specialist to Assist the client to update the Individual existing procurement plan. Component 1: Sectoral and IDA / D4100 Post Consultant Open 100,000.00 78,265.00 Signed 2019-01-29 2018-08-06 2019-02-18 2019-04-01 2019-02-21 2019-05-23 2019-03-08 2019-05-27 2024-03-20 Assist the PMU to plan Spatial Planning Tools Selection procurement activities over the anticipated duration of the Project (i.e., the next 5 years). TV-MOCT-105461-CS-INDV / Office Clerk, responsible for performing clerical and administrative duties in the Individual Component 1: Sectoral and PMU office setting. Assists IDA / D4100 Post Consultant Open 60,000.00 21,624.37 Signed 2019-03-12 2019-12-04 2019-04-10 2020-04-22 2019-05-01 2020-05-11 2019-05-24 2020-05-12 2019-11-20 Spatial Planning Tools Project Managers by sorting Selection mail, filing, answering phones, greeting clients, scheduling meetings, etc... Page 1 TV-MOCT-128785-CS-INDV Individual / SAFEGUARDS AND Component 3: Strengthening IDA / D4100 Post Consultant Open 200,000.00 0.00 Under Review 2019-08-22 2021-03-16 2019-10-10 2019-10-31 2019-12-05 2020-06-02 MONITORING AND the Enabling Envrionment Selection EVALUATION SPECIALIST Individual TV-MOCT-96580-CS-INDV / Component 4: Contingency IDA / V0750 Post Consultant Direct 275,000.00 41,697.60 Completed 2019-12-04 2020-09-24 2019-12-14 2018-10-01 2020-01-04 2018-10-01 2020-02-08 2019-10-01 2020-08-06 2021-05-31 Project Manager Emergency Response Selection TV-MOCT-148299-CS-INDV Individual Component 1: Sectoral and / Update of the ESIA and ESMP IDA / D4100 Post Consultant Direct 15,400.00 51,800.00 Signed 2019-12-06 2019-12-17 2019-12-08 2019-12-17 2019-12-09 2019-12-19 2019-12-31 2019-12-19 2020-06-28 Spatial Planning Tools for works under MICRO Selection TV-MOCT-210628-CS-CDS / MICRO project accountant Component 3: Strengthening IDA / D4100 Post Direct Selection Direct 10,834.00 0.00 Canceled 2020-12-17 2021-01-04 2021-02-04 2021-04-01 2022-04-01 part-time contract (8 working the Enabling Envrionment day a month) for two years TV-MOCT-213798-CS-CDS / MICRO Project Accountant Component 3: Strengthening IDA / D4100 Post Direct Selection Direct 10,834.00 0.00 Under Review 2021-01-14 2021-04-01 2021-01-24 2021-03-30 2021-09-26 Part-Time COntract ( 8 the Enabling Envrionment working days a month) TV-MOCT-220155-CS-INDV Individual / TECHNICAL ADVISOR - Component 3: Strengthening IDA / D4100 Post Consultant Open 100,000.00 0.00 Under Review 2021-02-17 2021-04-13 2021-04-07 2021-04-28 2021-06-02 2021-11-29 CONTRACT MANAGEMENT the Enabling Envrionment Selection SPECIALIST Individual TV-MPWIELMD-235853-CS- Component 3: Strengthening Under IDA / D4100 Post Consultant Limited 55,000.00 0.00 2021-05-23 2021-06-01 2021-05-28 2021-06-18 2021-07-01 2022-06-30 INDV / Project Manager the Enabling Envrionment Implementation Selection Page 2 Procurement Plan I. General 2. Bank’s approval Date of the procurement Plan: March 17, 2017 3. Date of General Procurement Notice: February 14, 2017 4. Period covered by this procurement plan: March 2017 to Feb 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 10 Substantial installation of plant and equipment and PPP) 2. (Goods; Information Technology & 2 Substantial Non-Consulting Services) 3. Consultant Services (Firms) 1 Substantial 4. Consultant Services (Individual 0.3 Substantial Consultants) 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. March 17, 2017 9. Renewal or extension of individual consultants contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. March 17, 2017 PROCUREMENT Eastern Africa : HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2016-12-08 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161305 GPN Date: 2017-02-14 Project Name: HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT Loan / Credit No: / , IDA / V0630, IDA / 67680 K Executing Agency(ies): enya National Highways Authority WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KENHA-4313-CW-RFB / Upgrading of Isiolo - Kula Single Stage - One 2021-02- / Prior Request for Bids Open - International 0.00 Canceled 2017-10-02 2017-10-07 2017-12-06 2018-02-04 2018-03-11 Mawe Road. Approximately Envelope 23 77km KE-KENHA-124342-CW-RFB / Package 1: The upgrading to bitumen standards of sections Component A: Improving of the Isiolo – Mandera road; Single Stage - One 2023-10- IDA / V0630 Movement of People, Goods, Prior Request for Bids Open - International 0.00 Canceled 2019-07-30 2019-08-29 2019-10-10 2019-11-09 2019-12-14 Lot 1Isiolo - Kulamawe road Envelope 14 and Digital Connectivity section 77km and Lot 2 kulamawe - Modogashe 113km KE-KENHA-124352-CW-RFB / Package 3: Upgrading to bitumen standards of sections of the Isiolo – Mandera road, Component A: Improving Comprising 4 Lots namely; Single Stage - One 2023-10- IDA / V0630 Movement of People, Goods, Prior Request for Bids Open - National 0.00 Canceled 2019-08-06 2019-08-29 2019-10-10 2019-11-09 2019-12-14 Kutulo M – Dimu (15.5 Km) , Envelope 14 and Digital Connectivity Dimu – Dabasiti (15.5 Km), Dabasiti – Borehole 11 (15.5 Km), Borehole 11 – Elwak (15.5 Km) KE-KENHA-124351-CW-RFB / Package 2: Upgrading to bitumen standards of sections Component A: Improving Single Stage - One 2023-10- of the Isiolo – Mandera road; IDA / V0630 Movement of People, Goods, Prior Request for Bids Open - International 0.00 Canceled 2019-08-06 2019-08-29 2019-10-10 2019-11-09 2019-12-14 Envelope 14 Lot 1Wajir – Tarbaj (59.5 Km) and Digital Connectivity and Lot 2 Tarbaj – Kutulo M (59.5 Km) KE-KENHA-147752-CW-RFB / NORTH EASTERN TRANSPORT IMPROVEMENT PROJECT (NETIP) PACKAGE 1: UPGRADING OF Component A: Improving Single Stage - One 2023-11- ISIOLO – MODOGASHE ROAD; IDA / V0630 Movement of People, Goods, Prior Request for Bids Open - International 0.00 Canceled 2019-11-29 2020-02-21 2019-12-10 2020-04-21 2020-01-21 2020-02-29 2020-04-11 Envelope 02 COMPRISING OF 2 LOTS; and Digital Connectivity LOT 1: ISIOLO – KULAMAWE 77KM LOT 2: KULAMAWE – MODOGASHE 113KM KE-KENHA-199260-CW-RFB / HORN OF AFRICA GATEWAY Component D: Institutional Pending DEVELOPMENT PROJECT - Strengthening of Selected Single Stage - One 2022-04- IDA / 67680 Post Request for Bids Open - National 0.00 Implementat 2020-12-01 2020-12-31 2021-02-14 2021-03-16 2021-04-20 Green Energy Improvements Transport and Related Envelope 20 ion on Bara Bara Plaza (Office Institutions Complex for Road Authorities) KE-KENHA-201783-CW-RFB / (PKG1) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): PACKAGE Component A: Improving Under 1: Single Stage - One 2024-11- IDA / 67680 Movement of People, Goods, Prior Request for Bids Open - International 0.00 Implementat 2020-11-30 2020-11-27 2020-12-30 2020-12-01 2021-02-28 2021-03-11 2021-03-30 2021-05-29 Lot 1 - Isiolo-Kulamawe Envelope 09 and Digital Connectivity ion (A10/B84) Road section (77km) Lot 2 - Kulamawe-Modogashe (B84) Road Section (127km) KE-KENHA-201787-CW-RFB / (PCKG 2) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): PACKAGE 2 LOT 1: Wajir - Tarbaj road Component A: Improving Pending Single Stage - One 2025-01- (A13) (57km) IDA / 67680 Movement of People, Goods, Prior Request for Bids Open - International 0.00 Implementat 2021-02-17 2021-03-19 2021-05-18 2021-06-17 2021-08-16 Envelope 27 LOT 2: Tarbaj - Kotulo road and Digital Connectivity ion (A13) (64km) LOT 3: Kotulo - Kobo road (A13) (38km) LOT 4: Kobo - Elwak road (A13) (26km) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KENHA-196091-CS-CDS / HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT Component D: Institutional Pending (HoAGDP): Strengthening of Selected Request for Single Stage - One IDA / V0630 Post Limited 0.00 Implementati 2020-11-04 2020-12-30 2021-06-28 Procurement of printing for Transport and Related Quotations Envelope on stakeholder engagement and Institutions Grievance redress mechanism registers. Page 1 KE-KENHA-201797-GO-RFQ / (FCDC) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional FRONTIER COUNTIES Under Strengthening of Selected Request for Single Stage - One DEVELOPMENT COUNCIL IDA / 67680 Post Open - National 0.00 Implementati 2020-12-28 2021-06-08 2021-05-17 2021-11-13 Transport and Related Quotations Envelope (FCDC): on Institutions Purchase and supply of 8 motorcycles for FCDC community outreach (2 motorcycles per county) KE-KENHA-201803-GO-RFQ / (FCDC) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional FRONTIER COUNTIES Pending Strengthening of Selected Request for Single Stage - One DEVELOPMENT COUNCIL IDA / 67680 Post Open - National 0.00 Implementati 2021-07-28 2021-12-15 2022-06-13 Transport and Related Quotations Envelope (FCDC) on Institutions Procurement of design and printing works for the quarterly FCDC-HOAGDP Newsletter KE-KENHA-201810-GO-RFQ / (FCDC) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional Under FRONTIER COUNTIES Strengthening of Selected Request for Single Stage - One IDA / 67680 Post Open - National 0.00 Implementati 2020-12-28 2021-06-08 2021-05-17 2021-11-13 DEVELOPMENT COUNCIL Transport and Related Quotations Envelope on (FCDC): Institutions Procurement of IS/IT systems upgrade software & related equipment at FCDC Secretariat KE-KENHA-201815-GO-RFQ / (FCDC) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional Under FRONTIER COUNTIES Strengthening of Selected Request for Single Stage - One IDA / 67680 Post Open - National 0.00 Implementati 2020-12-28 2021-06-08 2021-05-17 2021-11-13 DEVELOPMENT COUNCIL Transport and Related Quotations Envelope on (FCDC): Institutions Purchase and Supply of Laptops and related IT Equipment KE-KENHA-201816-GO-RFQ / (FCDC) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional Under FRONTIER COUNTIES Strengthening of Selected Request for Single Stage - One IDA / 67680 Post Open - National 0.00 Implementati 2021-01-28 2021-06-08 2021-06-17 2021-12-14 DEVELOPMENT COUNCIL Transport and Related Quotations Envelope on (FCDC) Institutions Purchase and Supply of Assorted communication and project visibility equipment KE-KENHA-201818-GO-RFQ / (FCDC) HORN OF AFRICA GATEWAY DEVELOPMENT Component D: Institutional PROJECT (HoAGDP): Under Strengthening of Selected Request for Single Stage - One FRONTIER COUNTIES IDA / 67680 Post Open - National 0.00 Implementati 2020-12-28 2021-06-08 2021-05-17 2021-11-13 Transport and Related Quotations Envelope DEVELOPMENT COUNCIL on Institutions (FCDC) Purchase and Supply of Office Furniture KE-KENHA-201819-GO-RFQ / (FCDC) HORN OF AFRICA GATEWAY DEVELOPMENT Component D: Institutional PROJECT (HoAGDP): Under Strengthening of Selected Request for Single Stage - One FRONTIER COUNTIES IDA / 67680 Post Open - National 0.00 Implementati 2020-12-28 2021-06-08 2021-05-17 2021-11-13 Transport and Related Quotations Envelope DEVELOPMENT COUNCIL on Institutions (FCDC) Purchase and supply of Fire Protection Equipment KE-KENHA-236307-GO-RFB Component A: Improving Pending / Procurement of Survey & GIS Single Stage - One IDA / 67680 Movement of People, Goods, Prior Request for Bids Open - National 0.00 Implementati 2021-06-11 2021-07-11 2021-08-22 2021-09-21 2021-11-20 2021-11-26 equipment and software, Envelope and Digital Connectivity on Computers and accessories NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KENHA-4641-CS-LCS / Consulting services for design review and preparation of Least Cost Under safeguards documents for the / Prior Open - International 0.00 2017-01-16 2017-01-16 2017-01-23 2017-01-30 2017-03-06 2017-03-24 2017-03-20 2017-04-17 2017-05-01 2017-10-28 Selection Implementation Kulamawe - Modogashe section of the Isiolo - Mandera road KE-KENHA-4642-CS-LCS / Consulting services for design Component A: Improving review and preparation of Least Cost Under IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2017-01-16 2017-01-16 2017-01-23 2017-01-30 2017-03-06 2017-03-24 2017-03-20 2017-08-07 2017-04-17 2017-05-01 2017-10-28 safeguards documents for the Selection Implementation and Digital Connectivity Modogashe - Samater section of the Isiolo - Mandera road KE-KENHA-4645-CS-LCS / Consulting services for design review and preparation of Least Cost Under / Prior Open - International 0.00 2017-01-16 2017-01-16 2017-01-23 2017-01-30 2017-03-06 2017-03-24 2017-03-20 2017-04-17 2017-05-01 2017-10-28 safeguards documents for the Selection Implementation Elwak - Rhamu section of the Isiolo - Mandera road Page 2 KE-KENHA-4640-CS-LCS / Consultancy services for engineering design review and Least Cost Under preparation of safeguards / Prior Open - International 0.00 2017-01-25 2017-03-16 2017-01-25 2017-02-01 2017-03-24 2017-03-15 2017-03-24 2017-03-29 2017-04-19 2017-05-03 2017-10-30 Selection Implementation documentation for the Isiolo - Kulamawe section of the Isiolo - Mandera road KE-KENHA-4643-CS-LCS / Consulting services for design Component A: Improving review and preparation of Least Cost Under IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2017-01-16 2017-04-06 2017-01-16 2017-01-23 2017-03-06 2017-03-20 2017-06-29 2017-04-17 2017-05-01 2017-10-28 safeguards documents for the Selection Implementation and Digital Connectivity Wajir - Kotulo section of the Isiolo - Mandera road KE-KENHA-4644-CS-LCS / Consulting services for design review and preparation of Least Cost Under / Prior Open - International 0.00 2017-01-16 2017-03-16 2017-01-16 2017-01-23 2017-03-24 2017-03-06 2017-03-24 2017-03-20 2017-04-17 2017-05-01 2017-10-28 safeguards documents for the Selection Implementation Kutulo - Elwak section of the Isiolo - Mandera road KE-KENHA-29074-CS-QCBS / Consultancy services for Component A: Improving Construction Supervision of Quality And Cost- Under IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2017-09-25 2018-08-08 2017-10-16 2018-08-15 2018-01-01 2020-10-20 2018-02-26 2021-02-05 2018-04-16 2018-05-21 2018-07-30 2022-07-29 the Kulamawe - Modogashe Based Selection Implementation and Digital Connectivity section of Isiolo Mandera Road KE-KENHA-29083-CS-QCBS / Consultancy services for Component A: Improving Construction Supervision of Quality And Cost- Under IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2017-09-25 2018-08-08 2017-10-16 2018-08-15 2018-01-01 2020-10-20 2018-02-26 2021-02-05 2018-04-16 2018-05-21 2018-07-30 2022-07-29 the Isiolo - Kulamawe Road Based Selection Implementation and Digital Connectivity section of Isiolo - Mandera Road KE-KENHA-29131-CS-QCBS Component A: Improving / Consultancy services for Quality And Cost- Under IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2017-09-25 2018-08-07 2017-10-16 2018-08-15 2018-01-01 2020-12-24 2018-02-26 2021-03-15 2018-04-16 2018-05-21 2018-07-30 2022-07-29 Construction Supervision of Based Selection Implementation and Digital Connectivity Wajir - Kutulo road section KE-KENHA-29132-CS-QCBS Component A: Improving / Consultancy services for Quality And Cost- IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 Canceled 2017-09-25 2018-08-08 2017-10-16 2018-01-01 2018-02-26 2018-04-16 2018-05-21 2018-07-30 2022-07-29 Construction Supervision of Based Selection and Digital Connectivity Kutulo - Elwak road section KE-KENHA-29134-CS-QCBS / Consultancy Services for Component A: Improving Design and Construction Quality And Cost- Pending IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2017-09-25 2017-10-16 2018-01-01 2018-02-26 2018-04-16 2018-05-21 2018-07-30 2022-07-29 Supervision of Weighbridges Based Selection Implementation and Digital Connectivity on the Isiolo - Wajir - Mandera road section KE-KENHA-51151-CS-INDV / Short term Consultancy Component A: Improving Consultant Services by a selected IDA / V0630 Movement of People, Goods, Post Qualification Limited 0.00 Canceled 2018-02-28 2018-03-14 2018-04-13 2018-05-18 2018-11-14 Individual Social Safeguards and Digital Connectivity Selection Specialist KE-KENHA-73582-CS-QCBS Component A: Improving / Consulting Services for Quality And Cost- Under IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2018-08-10 2018-08-14 2018-09-05 2018-08-15 2018-10-24 2020-11-16 2018-12-26 2021-03-15 2019-01-23 2019-03-13 2019-05-01 2023-06-29 Construction Supervision of Based Selection Implementation and Digital Connectivity Dabasiti - Elwak Road KE-KENHA-73198-CS-QCBS Component A: Improving / Consultancy Services for Quality And Cost- Under IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2018-08-10 2018-08-14 2018-09-05 2018-08-15 2018-10-24 2020-11-16 2018-12-26 2021-03-15 2019-01-23 2019-03-13 2019-05-01 2023-04-30 Construction Supervsion of Based Selection Implementation and Digital Connectivity Kutulo - Dabasiti Road KE-KENHA-77223-CS-QCBS / Consultancy Services for Component A: Improving Needs Assessment of Social Quality And Cost- IDA / V0630 Movement of People, Goods, Post Open - National 303,832.29 Signed 2018-09-21 2018-10-18 2018-10-12 2018-10-23 2018-11-25 2021-03-16 2018-12-23 2021-03-16 2019-01-22 2021-03-16 2019-02-26 2021-03-16 2019-04-02 2019-12-23 2019-07-11 Infrastructure and Social Based Selection and Digital Connectivity Services for Isiolo - Rhamu (664Km) KE-KENHA-77220-CS-QCBS / Consultancy Services for Gender Based Violence (GBV) Component A: Improving and Prevention of Sexual Quality And Cost- Under IDA / V0630 Movement of People, Goods, Post Open - National 0.00 2018-09-21 2018-10-05 2018-10-12 2018-10-23 2018-11-25 2018-12-23 2019-01-22 2019-02-26 2019-04-02 2022-04-01 Exploitation and Abuse (SEA) Based Selection Implementation and Digital Connectivity for Isiolo - Modogashe (190Km) & Wajir - Elwak (175Km) KE-KENHA-133667-CS-QCBS / Consultancy services for Community Outreach and Social Communication, Security Perception Survey, Component A: Improving Quality And Cost- Under Implementation of the Project IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 2019-09-16 2019-10-18 2019-10-07 2019-11-19 2019-12-06 2020-01-03 2020-02-02 2020-03-31 2020-05-24 2023-05-24 Based Selection Implementation GRM, Mitigation Against GBV and Digital Connectivity and Prevention of SEA Lot 1: Isiolo County Lot 2: Wajir County Lot 3: Mandera County KE-KENHA-198500-CS-QCBS / HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT: Consultancy Services to Component D: Institutional assess KeNHA’s Strengthening of Selected Quality And Cost- Pending Environmental & Social IDA / V0630 Post Open - National 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-04 2021-09-03 2021-10-08 2021-11-12 2022-11-12 Transport and Related Based Selection Implementation Safeguards Capacity to Institutions Monitor and Manage Environment & Social Safeguards risks in road projects Page 3 KE-KENHA-198521-CS-QCBS / HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT: Component D: Institutional Consultancy Services to Strengthening of Selected Quality And Cost- Under support KeNHA in IDA / V0630 Prior Open - International 0.00 2020-10-30 2020-11-20 2021-01-03 2021-01-31 2021-03-02 2021-04-06 2021-05-11 2023-05-11 Transport and Related Based Selection Implementation Implementation and Institutions monitoring of the Resettlement Action Plans and Land Surveying. KE-KENHA-198525-CS-QCBS / HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT: Component D: Institutional Consultancy Services to Strengthening of Selected Quality And Cost- Pending IDA / V0630 Post Open - International 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-26 2021-09-25 2021-10-30 2021-12-04 2022-12-04 develop KeNHA's Transport and Related Based Selection Implementation Environmental, Social, Health Institutions and Safety Management System KE-KENHA-198539-CS-QCBS Component D: Institutional / HORN OF AFRICA GATEWAY Strengthening of Selected Quality And Cost- Under IDA / V0630 Post Open - National 0.00 2020-10-30 2021-06-10 2020-11-20 2021-01-03 2021-01-31 2021-03-02 2021-04-06 2021-05-11 2021-11-07 DEVELOPMENT PROJECT: Transport and Related Based Selection Implementation Biodiversity Assessment Study Institutions KE-KENHA-199084-CS-QCBS / HORN OF AFRICA GATEWAY Component D: Institutional DEVELOPMENT PROJECT: Strengthening of Selected Quality And Cost- Under Updating the feasibility and IDA / 67680 Prior Open - International 0.00 2020-11-12 2021-03-01 2020-12-03 2021-04-13 2021-01-16 2021-02-06 2021-02-27 2021-04-03 2021-05-08 2022-05-08 Transport and Related Based Selection Implementation detailed design studies for the Institutions Garissa-Liboi-Harhar road section (200km) KE-KENHA-29127-CS-QCBS / Consultancy services for Component A: Improving Quality And Cost- Construction Supervision IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 Canceled 2017-09-25 2017-10-16 2018-01-01 2018-02-26 2018-04-16 2018-05-21 2018-07-30 2022-07-29 Based Selection Samatar - Wajir road section and Digital Connectivity of Isiolo - Mandera Road KE-KENHA-29111-CS-QCBS / Consultancy services for Component A: Improving Quality And Cost- Construction Supervision IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 Canceled 2017-09-25 2017-10-16 2018-01-01 2018-02-26 2018-04-16 2018-05-21 2018-07-30 2022-07-29 Based Selection Modogashe - Samatar road and Digital Connectivity section KE-KENHA-164143-CS-QCBS / NORTH EASTERN TRANSPORT IMPROVEMENT PROJECT (NETIP). Component A: Improving CONSULTANCY SERVICES FOR Quality And Cost- IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 Canceled 2020-03-16 2020-03-30 2020-05-13 2020-06-10 2020-07-10 2020-08-14 2020-09-18 2025-04-25 CONSTRUCTION SUPERVISION Based Selection and Digital Connectivity OF MODOGASHE - SAMATAR SECTION (90KMS) OF THE ISIOLO - MANDERA ROAD (A10/B84/A13) KE-KENHA-164188-CS-QCBS / NORTH EASTERN TRANSPORT IMPROVEMENT PROJECT (NETIP). Component A: Improving CONSULTANCY SERVICES FOR Quality And Cost- IDA / V0630 Movement of People, Goods, Prior Open - International 0.00 Canceled 2020-03-16 2020-03-30 2020-05-13 2020-06-10 2020-07-10 2020-08-14 2020-09-18 2025-04-25 CONSTRUCTION SUPERVISION Based Selection and Digital Connectivity OF SAMATAR - WAJIR SECTION (68KMS) OF THE ISIOLO - MANDERA ROAD (A10/B84/A13) KE-KENHA-201820-CS-QCBS / (UoN) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional UNIVERSITY OF NAIROBI (UoN) Strengthening of Selected Quality And Cost- Pending Consultancy Services to IDA / 67680 Post Open - International 0.00 2020-11-30 2021-01-29 2021-03-30 2021-05-29 2021-06-28 2021-08-27 2021-10-26 2022-10-26 Transport and Related Based Selection Implementation undertake Design Update and Institutions Finalization of bidding document, Supervision and Contract Management of the CELARS Construction Works KE-KENHA-201821-CS-QBS / (UoN) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): UNIVERSITY OF NAIROBI Component D: Institutional (UoN): Strengthening of Selected Quality Based Pending IDA / 67680 Post Open - National 0.00 2021-01-29 2021-02-19 2021-04-04 2021-05-02 2021-06-01 2021-07-01 2021-08-05 2022-08-05 Consultancy Services to Transport and Related Selection Implementation undertake Environmental and Institutions Social Impact Assessment (ESIA) and secure NEMA License for the works of CELARS Facilities KE-KENHA-201822-CS-QCBS / (UoN) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional UNIVERSITY OF NAIROBI Strengthening of Selected Quality And Cost- Pending IDA / 67680 Post Open - National 0.00 2020-11-30 2020-12-30 2021-02-28 2021-03-30 2021-04-29 2021-06-28 2021-08-27 2022-08-27 (UoN): Transport and Related Based Selection Implementation Consultancy Services to Institutions undertake a Business Development Plan for the CELARS KE-KENHA-201828-CS-QCBS / (UoN) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional UNIVERSITY OF NAIROBI Strengthening of Selected Quality And Cost- Pending IDA / 67680 Post Open - National 0.00 2020-11-30 2020-12-30 2021-02-28 2021-03-30 2021-04-29 2021-06-28 2021-08-27 2022-08-27 (UoN): Transport and Related Based Selection Implementation Consultancy Services to Institutions Prepare a Curriculum on Gender-based Violence (GBV) Course for CELARS Page 4 KE-KENHA-201829-CS-QCBS / (UoN) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): UNIVERSITY OF NAIROBI Component D: Institutional (UoN): Strengthening of Selected Quality And Cost- Pending IDA / 67680 Post Open - National 0.00 2020-11-30 2020-12-30 2021-02-28 2021-03-30 2021-04-29 2021-06-28 2021-08-27 2022-08-27 Consultancy services for the Transport and Related Based Selection Implementation preparation of a curriculum Institutions on Social Assessment Course Relating to Indigenous/marginalized for CELARS KE-KENHA-201830-CS-QCBS / (UoN) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional UNIVERSITY OF NAIROBI Strengthening of Selected Quality And Cost- Pending (UoN): IDA / 67680 Post Open - National 0.00 2020-11-30 2020-12-30 2021-02-28 2021-03-30 2021-04-29 2021-06-28 2021-08-27 2022-08-27 Transport and Related Based Selection Implementation Consultancy Services for the Institutions development of a curriculum on Social Impact Assessment Course for ESIA Experts for CELARS KE-KENHA-201831-CS-QCBS / (UoN) HORN OF AFRICA GATEWAY DEVELOPMENT PROJECT (HoAGDP): Component D: Institutional UNIVERSITY OF NAIROBI Strengthening of Selected Quality And Cost- Pending (UoN): IDA / 67680 Post Open - National 0.00 2020-11-30 2020-12-30 2021-02-28 2021-03-30 2021-04-29 2021-06-28 2021-08-27 2022-08-27 Transport and Related Based Selection Implementation Consultancy Services Institutions Undertake an Analysis of the Resettlement Action Plan Process with KeNHA and the NLC KE-KENHA-219576-CS-QCBS / Consultancy services for Community Outreach and Component D: Institutional Social Communication, Strengthening of Selected Quality And Cost- Under Security Perception Survey, IDA / 67680 Post Open - National 0.00 2021-03-21 2021-02-22 2021-04-20 2021-06-10 2021-07-08 2021-08-07 2021-09-11 2021-10-25 2022-10-25 Transport and Related Based Selection Implementation Implementation of the Project Institutions GRM, Mitigation Against GBV and Prevention of SEA-Lot 2: Wajir County KE-KENHA-219596-CS-QCBS / Consultancy services for Community Outreach and Component D: Institutional Social Communication, Strengthening of Selected Quality And Cost- Pending Security Perception Survey, IDA / 67680 Post Open - National 0.00 2021-03-21 2021-04-20 2021-06-10 2021-07-08 2021-08-07 2021-09-11 2021-10-25 2022-10-25 Transport and Related Based Selection Implementation Implementation of the Project Institutions GRM, Mitigation Against GBV and Prevention of SEA-Lot 3: Mandera County KE-KENHA-223068-CS-QCBS / ‘Consultancy services for Component C: Improving Community Outreach and Access to Selected Basic Social Communication, Social Services at Designated Quality And Cost- Security Perception Survey, IDA / 67680 Prior Open - International 0.00 Canceled 2021-04-30 2021-05-13 2021-05-21 2021-07-14 2021-08-12 2021-09-21 2021-11-21 2021-11-21 2022-11-21 Locations along Isiolo- Based Selection Implementation of the Project Mandera Regional Roa d GRM, Mitigation Against GBV Corridor and Prevention of SEA L Lot 3: Mandera County KE-KENHA-223057-CS-QCBS / Consultancy Service for community Outreach and Component D: Institutional Social Communication, Strengthening of Selected Quality And Cost- Security Perception Survey, IDA / 67680 Prior Open - International 0.00 Under Review 2021-03-21 2021-03-21 2021-03-21 2021-05-03 2021-04-18 2021-04-21 2021-06-21 2021-07-21 2022-07-21 Transport and Related Based Selection Implementation of the project Institutions GRM, Mitigation against GBV and Prevention of SEA for Isiolo and Meru Counties KE-KENHA-223065-CS-QCBS / Consultancy services for Community Outreach and Component D: Institutional Social Communication, Strengthening of Selected Quality And Cost- Security Perception Survey, IDA / 67680 Prior Open - International 0.00 Under Review 2021-03-21 2021-03-21 2021-03-21 2021-05-01 2021-04-18 2021-04-21 2021-06-21 2021-07-21 2022-07-21 Transport and Related Based Selection Implementation of the Project Institutions GRM, Mitigation Against GBV and Prevention of SEA Lot 2: Wajir County KE-KENHA-199083-CS-QCBS / HORN OF AFRICA GATEWAY Component D: Institutional DEVELOPMENT PROJECT: Strengthening of Selected Quality And Cost- IDA / 67680 Prior Open - International 0.00 Canceled 2020-12-01 2021-02-01 2020-12-22 2021-02-04 2021-03-04 2021-04-03 2021-05-08 2021-06-12 2025-06-11 Consultancy services for M&E Transport and Related Based Selection for the project (by accredited Institutions university) KE-KENHA-219598-CS-QCBS / Lot 1: Consultancy Services to Support implementation of Component D: Institutional Resettlement Action Plan Strengthening of Selected Quality And Cost- Implementation Associated IDA / 67680 Post Open - International 0.00 Canceled 2021-03-21 2021-04-06 2021-04-11 2021-05-25 2021-06-22 2021-07-22 2021-08-26 2021-09-30 2022-09-30 Transport and Related Based Selection with Upgrading of Isiolo- Institutions Modogashe Road Section and Provision of Related Socio- Economic Infrastructure KE-KENHA-219605-CS-QCBS / Lot 3: Consultancy Services to Support implementation of Component D: Institutional Resettlement Action Plan Strengthening of Selected Quality And Cost- Implementation Associated IDA / 67680 Post Open - International 0.00 Canceled 2021-03-21 2021-04-06 2021-04-11 2021-05-25 2021-06-22 2021-07-22 2021-08-26 2021-09-30 2022-09-30 Transport and Related Based Selection with Upgrading of Wajir-Elwak- Institutions Mandera Road Section and Provision of Related Socio- Economic Infrastructure Page 5 KE-KENHA-219601-CS-QCBS / Lot 2: Consultancy Services to Support implementation of Component D: Institutional Resettlement Action Plan Strengthening of Selected Quality And Cost- Implementation Associated IDA / 67680 Post Open - International 0.00 Canceled 2021-03-21 2021-03-26 2021-04-11 2021-05-25 2021-06-22 2021-07-22 2021-08-26 2021-09-30 2022-09-30 Transport and Related Based Selection with Upgrading of Modogashe- Institutions Wajir Road Section and Provision of Related Socio- Economic Infrastructure KE-KENHA-231111-CS-QCBS / Lot 1: Consultancy Services to Support implementation of Component D: Institutional Resettlement Action Plan Strengthening of Selected Quality And Cost- Under Implementation Associated IDA / 67680 Post Open - International 0.00 2021-04-23 2021-05-04 2021-05-14 2021-06-04 2021-06-27 2021-07-25 2021-08-24 2021-09-28 2021-11-02 2022-11-02 Transport and Related Based Selection Implementation with Upgrading of Isiolo- Institutions Modogashe Road Section and Provision of Related Socio- Economic Infrastructure KE-KENHA-231116-CS-QCBS / Lot 2: Consultancy Services to Support implementation of Component D: Institutional Resettlement Action Plan Strengthening of Selected Quality And Cost- Under Implementation Associated IDA / 67680 Post Open - International 0.00 2021-04-23 2021-05-04 2021-05-14 2021-06-04 2021-06-27 2021-07-25 2021-08-24 2021-09-28 2021-11-02 2022-11-02 Transport and Related Based Selection Implementation with Upgrading of Modogashe- Institutions Wajir Road Section and Provision of Related Socio- Economic Infrastructure KE-KENHA-231124-CS-QCBS / Lot 3: Consultancy Services to Support implementation of Component D: Institutional Resettlement Action Plan Strengthening of Selected Quality And Cost- Under Implementation Associated IDA / 67680 Post Open - International 0.00 2021-04-23 2021-05-04 2021-05-14 2021-06-02 2021-06-27 2021-07-25 2021-08-24 2021-09-28 2021-11-02 2022-11-02 Transport and Related Based Selection Implementation with Upgrading of Wajir-Elwak- Institutions Mandera Road Section and Provision of Related Socio- Economic Infrastructure KE-KENHA-233094-CS-CQS / HORN OF AFRICA GATEWAY Component D: Institutional DEVELOPMENT PROJECT: Strengthening of Selected Quality And Cost- IDA / 67680 Prior Open - National 0.00 Under Review 2021-06-04 2021-06-10 2021-06-25 2021-08-08 2021-09-05 2021-10-05 2021-11-09 2021-12-14 2022-12-14 Consultancy services for M&E Transport and Related Based Selection for the project (by accredited Institutions university) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KENHA-6112-CS-CDS / Consulting services for Under preparation of a Social / Prior Direct Selection Direct 0.00 2017-02-02 2017-04-03 2017-06-12 2018-04-08 Implementation Assessment for the Isiolo - Mandera road KE-KENHA-21967-CS-CDS / Consultancy Services for Component A: Improving Under Engineering Design Review for IDA / V0630 Movement of People, Goods, Prior Direct Selection Direct 0.00 2017-08-14 2017-09-05 2017-09-13 2017-11-23 2018-05-22 Implementation Samatar - Wajir Section of the and Digital Connectivity Isiolo Mandera Road KE-KENHA-51138-CS-INDV / Short term consultancy Component A: Improving Individual Under services by a selected IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-03-08 2021-03-05 2018-03-18 2021-03-18 2018-04-08 2021-06-02 2018-05-13 2018-11-09 Implementation individual Environmental and Digital Connectivity Selection Safeguards Specialist KE-KENHA-55487-CS-INDV / Short term Consultancy Component A: Improving Individual Pending Services by a selected IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-03-26 2018-03-31 2018-04-21 2018-05-26 2018-11-22 Implementation individual Social Safeguards and Digital Connectivity Selection Specialist. KE-KENHA-77179-CS-INDV / Short term Individual Component A: Improving Individual Consultancy Services for Pending IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-14 2018-09-19 2018-10-10 2018-11-14 2019-05-13 Environmental and Social Implementation and Digital Connectivity Selection Impact Assessment (ESIA) for Isiolo _ Modogashe (190Km) KE-KENHA-77180-CS-INDV / Short term Individual Consultancy Services for Component A: Improving Individual Pending Social Impact Assessment IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-14 2018-09-19 2018-10-10 2018-11-14 2019-05-13 Implementation (SIA) and Resettlement Action and Digital Connectivity Selection Plan (RAP) Isiolo _ Modogashe (190Km) KE-KENHA-77181-CS-INDV / Short term Individual Component A: Improving Individual Consultancy Services for Pending IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-14 2018-09-19 2018-10-10 2018-11-14 2019-05-13 Environmental and Social Implementation and Digital Connectivity Selection Impact Assessment (ESIA) for Modogashe _ Wajir (157Km) KE-KENHA-77182-CS-INDV / Short term Individual Consultancy Services for Component A: Improving Individual Pending Social Impact Assessment IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-14 2018-09-19 2018-10-10 2018-11-14 2019-05-13 Implementation (SIA) and Resettlement Action and Digital Connectivity Selection Plan (RAP) for Modogashe _ Wajir (157Km) KE-KENHA-77206-CS-INDV / Short term Individual Component A: Improving Individual Consultancy Services for Pending IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-21 2018-09-26 2018-10-17 2018-11-21 2019-05-20 Environmetal and Social Implementation and Digital Connectivity Selection Impact Assessment (ESIA) for Wajir - Elwak (175Km) Page 6 KE-KENHA-77214-CS-INDV / Short term Individual Consultancy Services for Component A: Improving Individual Pending Social Impact Assessment IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-21 2018-09-26 2018-10-17 2018-11-21 2019-05-20 Implementation (SIA) and Resettlement Action and Digital Connectivity Selection Plan (RAP) for Wajir - Elwak (175Km) KE-KENHA-77217-CS-INDV / Short term Individual Component A: Improving Individual Consultancy Services for Pending IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-21 2018-09-26 2018-10-17 2018-11-21 2019-05-20 Environmetal and Social Implementation and Digital Connectivity Selection Impact Assessment (ESIA) for Elwak - Rhamu (142Km) KE-KENHA-77215-CS-INDV / Short term Individual Consultancy Services for Component A: Improving Individual Pending Social Impact Assessment IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-21 2018-09-26 2018-10-17 2018-11-21 2019-05-20 Implementation (SIA) and Resettlement Action and Digital Connectivity Selection Plan (RAP) for Elwak - Rhamu (142Km) KE-KENHA-77200-CS-INDV / Short term Individual Component A: Improving Individual Consultancy Services for Under IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-21 2018-10-15 2018-09-26 2018-10-17 2018-11-21 2019-05-20 Environmetal and Social Implementation and Digital Connectivity Selection Management Frame work for Isiolo - Rhamu (664Km) KE-KENHA-77197-CS-INDV / Short term Individual Component A: Improving Individual Consultancy Services for Pending IDA / V0630 Movement of People, Goods, Post Consultant Limited 0.00 2018-09-21 2018-09-26 2018-10-17 2018-11-21 2019-05-20 Resettlement Policy Implementation and Digital Connectivity Selection Framework for Isiolo - Rhamu (664Km) KE-KENHA-83513-CS-INDV / Individual Component B: Facilitation of Pending Consultancy Services for IDA / V0630 Post Consultant Limited 0.00 2018-11-30 2018-12-05 2018-12-26 2019-01-23 2019-01-28 Regional Trade and Transport Implementation Training Needs Assessment Selection KE-KENHA-83515-CS-INDV / Individual Workshop for the Validation Component B: Facilitation of Pending IDA / V0630 Post Consultant Limited 0.00 2018-11-30 2018-12-05 2018-12-26 2019-01-23 2019-01-30 of the Training Needs Regional Trade and Transport Implementation Selection Assessment KE-KENHA-83516-CS-INDV / Individual Consultancy Services to Component B: Facilitation of Pending IDA / V0630 Post Consultant Limited 0.00 2018-11-30 2018-12-05 2018-12-26 2019-01-23 2019-01-28 Facilitate Curriculum Regional Trade and Transport Implementation Selection Development KE-KENHA-83517-CS-INDV / Individual Component B: Facilitation of Pending Workshop for the Validation IDA / V0630 Post Consultant Limited 0.00 2018-11-30 2018-12-14 2019-01-04 2019-02-01 2019-03-03 Regional Trade and Transport Implementation of the Training Curriculum Selection KE-KENHA-198532-CS-INDV Component D: Institutional / HORN OF AFRICA GATEWAY Individual Strengthening of Selected Under DEVELOPMENT PROJECT: Short IDA / V0630 Post Consultant Open 0.00 2020-10-30 2021-03-04 2020-12-18 2021-01-08 2021-02-12 2024-02-12 Transport and Related Implementation Term Occupational Health and Selection Institutions Safety (OHS) Specialist KE-KENHA-198538-CS-INDV Component D: Institutional / HORN OF AFRICA GATEWAY Individual Strengthening of Selected Under DEVELOPMENT PROJECT: Short IDA / V0630 Post Consultant Open 0.00 2020-10-30 2021-03-04 2020-12-18 2021-01-08 2021-02-12 2024-02-12 Transport and Related Implementation Term Gender and GBV Selection Institutions Specialist KE-KENHA-198548-CS-INDV Component D: Institutional / HORN OF AFRICA GATEWAY Individual Strengthening of Selected Pending DEVELOPMENT PROJECT: Short IDA / V0630 Post Consultant Open 0.00 2020-10-30 2020-12-18 2021-01-08 2021-02-12 2024-02-12 Transport and Related Implementation Term Environmental Selection Institutions Safeguards Specialist KE-KENHA-198527-CS-QCBS Component D: Institutional / HORN OF AFRICA GATEWAY Individual Strengthening of Selected DEVELOPMENT PROJECT: Short IDA / V0630 Post Consultant Open 0.00 Canceled 2020-10-30 2021-03-04 2020-12-18 2021-01-08 2021-02-12 2024-02-12 Transport and Related Term Social Safeguards Selection Institutions Specialist Component D: Institutional KE-KENHA-223032-CS-INDV Individual Strengthening of Selected Under / Short Term Land Acquisition IDA / 67680 Post Consultant Limited 0.00 2021-03-08 2021-03-16 2021-03-22 2021-03-18 2021-03-29 2021-06-02 2021-04-21 2024-04-21 Transport and Related Implementation and Resettlement Expert Selection Institutions KE-KENHA-237519-CS-INDV Component D: Institutional / Consultancy Services on Individual Strengthening of Selected Under development of Rules and IDA / 67680 Post Consultant Open 0.00 2021-06-08 2021-06-07 2021-07-20 2021-08-03 2021-09-07 2021-10-07 Transport and Related Implementation procedures for Handling Selection Institutions Procurement Complaints Page 7 Uzbekistan DHEEP THRESHOLDS FOR PROCUREMENT METHODS AND BANK PRIOR REVIEW Contract Value Expenditure Threshold Procurement Method Contracts Subjects to Prior Review (US$) Category (US$) >=1,000,000 ICB ICB contracts > 1,500,000 <1,000,000 NCB First 1 NCB contract Goods and Works <100,000 Shopping First Shopping contract NA DC All DC contracts >=300,000 QCBS/QBS/LCS/FBS a/ b/ >=500,000 for firms Consultant <300,000 CQS Services (including training) NA SSS all SSS contracts NA IC >=100,000 for individuals Notes: a/ Shortlist may compose entirely of national consultants for assignments of less than US$100,000 equivalent per contract. b/ As appropriate, these methods may be adopted for assignments costing less than $200,000. ICB – International Competitive Bidding NCB – National Competitive Bidding DC – Direct Contracting QCBS – Quality and Cost Based Selection QBS – Quality Based Selection LCS – Least Cost Selection FBS – Fixed Budget Selection CQS – Selection Based on Consultants’ Qualifications SSS – Single Source Selection IC – Individual Consultants REF: as available in Imagebank PROCUREMENT Uzbekistan : Modernization and Upgrade of Transmission Substations PLAN General Information Country: Uzbekistan Bank’s Approval Date of the Original Procurement Plan: 2016-08-22 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156584 GPN Date: 2018-02-27 Project Name: Modernization and Upgrade of Transmission Substations Loan / Credit No: / , IDA / 59170, IDA / 59160, IBRD / 86640 J Executing Agency(ies): SC Uzbekenergo WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MUTS/NCB/2016-1LOT-1 / Component 1. Electricity Under 2021-06- CONTSTRUCTION AND IBRD / 86640 Transmission System Post Direct Selection Direct 0.00 Implementat 2020-10-24 2020-10-30 2020-10-29 2020-11-04 2020-12-03 01 INSTALLATION WORKS Upgrade ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MUTS/ICB-2016-2 / Component 1. Electricity Single Stage - One Procurement of electrical / Transmission System Prior Request for Bids Open - International 0.00 Canceled 2016-08-22 2016-08-22 2016-08-27 2016-08-22 2016-10-08 2016-11-07 2018-09-12 2016-12-12 2017-06-10 Envelope equipment Upgrade MUTS/ICB/2016-3 / Component 1. Electricity Procurement of Medium Single Stage - One IDA / 59170 Transmission System Prior Request for Bids Open - International 1,790,622.00 Signed 2016-10-12 2018-07-25 2016-11-02 2018-08-27 2016-12-14 2018-10-08 2017-01-13 2018-11-22 2017-02-17 2018-12-04 2017-08-16 voltage and Low voltage Envelope Upgrade power equipment MUTS/ICB/2016-1 / Component 1. Electricity Procurement of Single Stage - One IDA / 59170 Transmission System Prior Imports Open - International 19,918,200.00 Signed 2018-03-12 2018-05-15 2018-03-14 2018-04-04 2018-05-04 2018-05-17 2018-06-08 2016-12-29 2018-12-05 autotransformers and Envelope Upgrade transformers. MUTS/ICB/2016-9 / Component 1. Electricity Single Stage - One Procurement of specialized IDA / 59160 Transmission System Prior Request for Bids Open - International 3,034,600.00 Completed 2018-04-23 2018-07-25 2018-04-28 2018-08-29 2018-05-28 2018-10-22 2018-06-27 2018-11-27 2018-08-01 2018-12-05 2019-01-28 2019-12-20 Envelope machinery Upgrade MUTS/ICB/2016-5 / Component 1. Electricity Single Stage - One Procurement of High Voltage IDA / 59160 Transmission System Prior Request for Bids Open - International 3,861,558.00 Signed 2018-09-06 2018-12-01 2018-09-13 2018-12-03 2018-10-25 2019-02-04 2018-11-24 2019-04-11 2019-01-14 2019-06-07 2019-07-13 Envelope Equipment Upgrade MUTS/ICB/2016-2 R / Component 1. Electricity Single Stage - One Procurement of Power IDA / 59160 Transmission System Prior Request for Bids Open - International 2,871,888.00 Signed 2018-09-24 2018-11-21 2018-10-01 2018-12-04 2018-11-12 2019-02-04 2018-12-12 2019-04-30 2019-01-16 2019-05-13 2019-07-15 Envelope transformers Upgrade MUTS/ICB/2016-6 / Procurement HF Component 1. Electricity Single Stage - One communication equipment, IDA / 59160 Transmission System Prior Request for Bids Open - International 5,734,757.00 Signed 2018-11-19 2019-03-01 2018-11-30 2019-03-12 2019-01-11 2019-04-23 2019-02-10 2019-07-10 2019-03-17 2019-07-24 2019-09-13 Envelope Accumulator batteries and Upgrade rectifiers MUTS/ICB/2016-11 / Component 1. Electricity Single Stage - One Procurement of Specialized IDA / 59160 Transmission System Prior Request for Bids Open - International 1,040,000.00 Terminated 2019-03-05 2019-03-07 2019-03-10 2019-03-13 2019-04-23 2019-04-23 2019-05-23 2019-07-10 2019-06-28 2019-09-09 2019-12-25 Envelope machinery - 2 Upgrade MUTS/ICB/2016-4 / Procurement of High-Voltage Component 1. Electricity Single Stage - One Equipment, Communication IBRD / 86640 Transmission System Prior Request for Bids Open - International 0.00 Canceled 2019-06-24 2019-07-15 2019-08-26 2019-09-25 2019-10-23 2020-04-20 Envelope Equipment, Relay Protection Upgrade and Automation MUTS/ICB/2016-13 / Component 1. Electricity Implementation of the Single Stage - One IBRD / 86640 Transmission System Prior Request for Bids Open - International 0.00 Canceled 2019-01-07 2019-01-14 2019-02-25 2019-03-27 2019-05-27 2019-11-23 management information Envelope Upgrade system of JSC Uzbekenergo MUTS/ICB/2016-12 / Component 1. Electricity Single Stage - One Equipment for Substation IBRD / 86640 Transmission System Post Request for Bids Open - International 350,000.00 Completed 2019-09-11 2019-09-13 2019-10-11 2019-09-13 2019-11-22 2019-10-28 2019-12-22 2019-11-08 2020-02-02 2019-11-14 2020-06-01 2020-03-10 Envelope services Upgrade Component 1. Electricity Pending MUTS/ICB/2016-8 / Mobile Single Stage - One IDA / 59160 Transmission System Post Request for Bids Open - International 0.00 Implementati 2019-12-23 2020-01-06 2020-02-17 2020-03-18 2020-04-29 2020-10-26 substation Envelope Upgrade on MUTS/ICB/2016-7 / Procurement of Hardware. Package-1: Reinforced Component 1. Electricity concrete products. Single Stage - One IBRD / 86640 Transmission System Prior Request for Bids Open - International 0.00 Canceled 2019-11-19 2019-12-19 2020-02-02 2020-03-03 2020-04-15 2020-10-12 Package-2: Metal rollings. Envelope Upgrade Package-3: Cables and wires. Package-4: Linear-coupling fittings and Insulators. Component 1. Electricity Pending MUTS/ICB/2016-10 / GIS Single Stage - One IDA / 59170 Transmission System Prior Request for Bids Open - International 0.00 Implementati 2019-10-31 2019-11-05 2019-12-17 2020-01-16 2020-02-20 2020-08-18 substation 220/110/10 kV Envelope Upgrade on MUTS/ICB/2016- 4 / Package one: High-voltage and medium voltage equipment Component 1. Electricity Single Stage - One IBRD / 86640 Transmission System Prior Request for Bids Open - International 38,732,630.47 Signed 2019-09-23 2019-09-25 2019-10-14 2019-12-16 2019-11-25 2020-02-20 2019-12-25 2020-09-22 2020-01-22 2020-10-09 2021-01-21 Envelope Package two: Relay protection Upgrade and communication equipment MUTS/ICB/2016 -14 / Component 1. Electricity Single Stage - One Autotransformers for 500 kV IDA / 59170 Transmission System Prior Request for Bids Open - International 8,799,000.00 Signed 2020-01-24 2020-03-07 2020-02-23 2020-03-19 2020-04-05 2020-05-01 2020-05-05 2020-07-08 2020-06-09 2020-08-03 2020-12-06 Envelope Substation “Lochin” Upgrade Page 1 MUTS/ICB/2016-11 R / Component 1. Electricity Single Stage - One Procurement of Specialized IDA / 59160 Transmission System Post Request for Bids Open - International 1,100,020.00 Signed 2020-03-25 2020-03-18 2020-04-09 2020-03-19 2020-05-24 2020-05-01 2020-06-23 2020-06-05 2020-07-28 2020-06-22 2021-01-24 Envelope machinery - 2 Upgrade MUTS/ICB/2016-7/1 / LINE Component 1. Electricity Single Stage - One COUPLING FITTINGS AND IBRD / 86640 Transmission System Prior Request for Bids Open - International 1,900,000.01 Signed 2020-11-27 2020-12-09 2020-12-02 2021-01-06 2021-01-13 2021-02-10 2021-02-12 2021-04-20 2021-03-19 2021-04-30 2021-09-15 Envelope INSULATORS Upgrade MUTS/ICB/2016 -13 / Component 1. Electricity Pending Single Stage - One Enterprise resource planning IBRD / 86640 Transmission System Post Request for Bids Open - International 0.00 Implementati 2021-05-27 2021-06-11 2021-07-23 2021-08-22 2021-10-11 2021-11-16 Envelope (ERP) Upgrade on MUTS/ICB/2016-7/2 / MUTS/ICB/2016-7/2/1: CABLE AND WIRES; Component 1. Electricity Under MUTS/ICB/2016-7/2/2: Single Stage - One IBRD / 86640 Transmission System Prior Request for Bids Open - International 0.00 Implementati 2021-05-31 2021-06-18 2021-06-01 2021-07-13 2021-08-12 2021-09-16 2022-03-15 METAL ROLLINGS; Envelope Upgrade on MUTS/ICB/2016-7/2/3: REINFORCED CONCRETE PRODUCTS; NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MUTS/CS-4 / Feasibility Component 2. Institutional Quality And Cost- Pending studies for the proposed new IDA / 59160 Development and Technical Post Open - International 0.00 2019-10-08 2019-10-29 2019-12-12 2020-01-09 2020-02-08 2020-03-14 2020-04-18 2021-04-18 Based Selection Implementation transmission project Assistance Component 2. Institutional MUTS/CS-5 / Other key Quality And Cost- Pending IDA / 59160 Development and Technical Post Open - International 0.00 2019-11-04 2019-11-25 2020-01-08 2020-02-05 2020-03-06 2020-04-10 2020-05-15 2021-05-15 sectoral studies Based Selection Implementation Assistance Component 2. Institutional MUTS/CS-6 / Capacity Quality And Cost- Under IDA / 59160 Development and Technical Post Open - International 0.00 2019-10-28 2020-01-20 2019-11-18 2020-01-01 2020-01-29 2020-02-28 2020-04-03 2020-05-08 2021-05-08 development of sector entities Based Selection Implementation Assistance MUTS/CS-8 / Foreign Component 2. Institutional advisors for operation Quality And Cost- IDA / 59160 Development and Technical Prior Open - International 0.00 Canceled 2019-09-20 2019-09-10 2019-10-11 2019-09-11 2019-11-24 2019-12-22 2020-01-21 2020-02-25 2020-03-31 2021-03-31 management assistance of the Based Selection Assistance National Grid of Uzbekistan MUTS/CS-2 / Assessment of the current state and the need Component 2. Institutional for modernization and Quality And Cost- IDA / 59160 Development and Technical Prior Open - International 0.00 Canceled 2019-12-16 2020-01-06 2020-02-19 2020-03-18 2020-04-17 2020-05-22 2020-06-26 2021-06-26 expansion of the transmission Based Selection Assistance system with the new structure of the sector Component 2. Institutional MUTS/CS-7 / Current Quality And Cost- IDA / 59160 Development and Technical Prior Open - International 0.00 Canceled 2019-09-30 2019-10-21 2019-12-04 2020-01-01 2020-01-31 2020-03-06 2020-04-10 2021-04-10 expenditures for PMU Based Selection Assistance MUTS/CS-3 / Power system Component 2. Institutional Quality And Cost- Pending planning exercise and IDA / 59160 Development and Technical Post Open - International 0.00 2019-09-18 2019-10-09 2019-11-22 2019-12-20 2020-01-19 2020-02-23 2020-03-29 2021-03-29 Based Selection Implementation software upgrade Assistance Component 2. Institutional Quality And Cost- MUTS/CS-1/2 / Entity audit IDA / 59160 Development and Technical Prior Open - International 0.00 Canceled 2019-11-18 2019-12-09 2020-01-22 2020-02-19 2020-03-20 2020-04-24 2020-05-29 2021-05-29 Based Selection Assistance Component 2. Institutional MUTS/CS-1 / Project and Least Cost IDA / 59160 Development and Technical Prior Open - International 0.00 Canceled 2019-09-23 2019-09-11 2019-10-14 2019-11-27 2019-12-25 2020-01-24 2020-02-28 2020-04-03 2020-09-30 entity audits Selection Assistance Component 2. Institutional Consultant MUTS/CS-1/1 / Project audit IDA / 59160 Development and Technical Post Qualification Open - International 11,805.00 Signed 2019-10-21 2019-09-05 2019-11-11 2019-12-25 2019-10-10 2020-01-24 2019-10-16 2020-02-28 2019-10-18 2020-08-26 Assistance Selection MUTS/CS-2-2 / Transmission Component 2. Institutional Network Development and Quality And Cost- IDA / 59170 Development and Technical Prior Open - International 347,600.00 Signed 2020-01-27 2020-02-07 2020-02-17 2020-05-19 2020-04-01 2020-08-28 2020-04-29 2020-10-15 2020-05-29 2021-01-11 2020-07-03 2021-03-06 2020-08-07 2021-03-12 2021-08-07 Renewable Energy Integration Based Selection Assistance Plan MUTS/CS-10 / Feasibility Component 2. Institutional Quality And Cost- study and Bidding documents IDA / 59170 Development and Technical Post Open - International 184,858.22 Signed 2020-04-17 2020-05-11 2020-05-08 2020-05-15 2020-06-21 2020-06-10 2020-07-19 2020-08-25 2020-08-18 2020-10-05 2020-09-22 2020-10-26 2020-10-27 2021-06-07 2021-10-27 Based Selection for ERP Assistance Component 2. Institutional Least Cost MUTS/CS-1/2. / Entity audit IDA / 59170 Development and Technical Post Open - International 330,000.00 Signed 2020-10-27 2020-10-27 2020-10-27 2020-12-10 2020-11-09 2021-01-07 2020-12-18 2021-02-06 2021-01-22 2021-03-13 2021-03-31 2021-04-17 2021-03-31 2021-10-14 Selection Assistance INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2. Institutional TP/CS-3 / Projects and entity IDA / 59170 Development and Technical Prior Direct Selection Direct 0.00 Canceled 2018-10-30 2018-11-04 2018-11-20 2019-06-30 audit for 2017 Assistance MUTS/CS-8 / Foreign Component 2. Institutional Individual advisors for operation IDA / 59160 Development and Technical Post Consultant Open 24,000.00 Completed 2019-11-18 2019-09-06 2020-01-06 2019-09-07 2020-01-27 2019-11-11 2020-03-02 2019-11-13 2020-08-29 2020-09-03 management assistance of the Assistance Selection National Grid of Uzbekistan Page 2 MUTS/CS-8/1 / INTERNATIONAL EXPERT FOR THE POSITION OF DEPUTY CHAIRMAN FOR Component 2. Institutional Individual TRANSFORMATION, Under IBRD / 86640 Development and Technical Prior Consultant Open 0.00 2021-02-10 2021-02-18 2021-03-31 2021-04-21 2021-05-26 2021-11-22 DIGITIZATION AND Implementation Assistance Selection INFORMATION TECHNOLOGIES OF JSC “NATIONAL ELECTRIC GRID OF UZBEKISTAN MUTS/CS-8/2 / INTERNATIONAL EXPERT FOR THE POSITION OF Component 2. Institutional Individual Under INTERNATIONAL FINANCIAL IBRD / 86640 Development and Technical Post Consultant Open 0.00 2021-02-10 2021-02-18 2021-03-31 2021-04-21 2021-05-26 2021-11-22 Implementation MANAGER OF JSC “NATIONAL Assistance Selection ELECTRIC GRID OF UZBEKISTAN MUTS/CS-8/3 / INTERNATIONAL EXPERT FOR THE POSITION OF Component 2. Institutional Individual INTERNATIONAL MANAGER Under IBRD / 86640 Development and Technical Post Consultant Open 0.00 2021-02-10 2021-02-18 2021-03-31 2021-04-21 2021-05-26 2021-11-22 FOR TRANSMISSION Implementation Assistance Selection DEVELOPMENT OF "NATIONAL ELECTRIC GRID OF UZBEKISTAN" Page 3 MINISTERE DE REPUBLIQUE DE COTE D’IVOIRE L’ENVIRONNEMENT Union Discipline travail ET DU DEVELOPPEMENT --------------- DURABLE --------------- PROJET DE GESTION DES PESTICIDES OBSOLETES EN CÔTE D’IVOIRE UNITE INTEGREE D’ADMINISTRATION DES PROJETS (UIAP) ………………………………………………………. Plan de Passation des Marchés I. GÉNÉRALITÉS 1.1. Informations générales sur le projet Pays: République de Côte d’Ivoire Emprunteur : Gouvernement de Côte d’Ivoire Nom du Projet : Projet de Gestion des Pesticides obsolètes en côte d’Ivoire (PROGEP-CI) Numéros du Don : TF 0A0742 Identifiant du projet : P131778 Montant du Don : 7 000 000 $ US Unité de Gestion du Projet : Unité Intégrée d’Administration des projets (UIAP) 1.2 Date d’approbation du plan de passation de marchés Plan original : 20 octobre 2015 Révision 1 : 14-04-2016 Révision 2 : 19-10-2016 Révision 3 : 27 mars 2017 Révision 4 : 11 Juillet 2017 Révision 5 : ….au 31 décembre 2017 1.3 Date de publication de l’avis général de passation de marchés : dans UNDB et DgMarket 1.4 Période couverte par le Plan de passation des marchés : ……… au 31 décembre 2017 2.1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions de l'Annexe 1 des Directives de passation de marchés de janvier 2011, révisé en juillet 2014 : Nouveaux seuils de revue de la Banque élaborés en décembre 2012 et proposés au Gouvernement le 05 décembre 2012, révisés en juillet 2016 et liés au niveau de risque du projet. Nature des Méthode de passation Valeur seuil Contrats soumis à dépenses de marchés du marché examen préalable $EU de l’IDA 1. Travaux AOI ≥ 10,000,000 (y compris clés en Tous les contrats de AON < 10,000,000 main, Fourniture et 15.000.000 $EU et Demande de cotation – < 200,000 plus montage au moins 3 offres d’installations et Entente Directe (*) Pas de seuil Contrats ≥ 100,000 PPP) 2. Fournitures, AOI ≥ 1,000,000 Systèmes AON < 1,000,000 d’Informations et Consultation de Services autres Fournisseurs à l’échelle que les services < 100,000 Tous les contrats de Nationale - Au moins 3 de Consultants offres 4.000.000 $EU et Consultation de plus Fournisseurs à l’échelle Nationale - Au moins 3 < 500 000 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil Contrats ≥ 100,000 (*) Le justificatif de toute entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 2.2. Pré qualification : Les soumissionnaires pour (Nature des fournitures) devront être pré-qualifiés suivant les dispositions des paragraphes 2.9 et 2.10 des Directives : N/A 2.3. Procédures applicables aux Composantes relatives au Développement Conduit par les Communautés (en relation avec le paragraphe 3.17 des Directives) : N/A 2.4. Référence (si nécessaire) au Manuel opérationnel/de passation de marchés : Manuel opérationnel (En cours de validation). 2.5. Autres arrangements spécifiques pour la passation de marchés : N/A 2.6. Marchés, planning et Méthode de passation 3.2.1 Type de marchés : Fournitures et travaux 1 2 3 4 5 6 7 8 Méthode Préférence Exam. Coût estimé passation P-Q Ouverture Liste des ensembles de marchés fournisseur par Marchés plis prévue s locaux Banque Commentaire BAILLEURS A priori/A N° Description ($EU) OUI/NON OUI/NON Date prévue posteriori TRAVAUX - - - - - - - - SOUS-TOTAL TRAVAUX PROGEP-CI - FOURNITURES (BIENS) Acquisition d’ordinateurs pour les Marché exécuté En A attente de 33 superviseurs et de tablettes 1 96, 962 CFN Non Non posterior 12/04/2017 paiement pour les 113 agents d’inventaire et i d’un serveur Acquisition de quatre (04) véhicules en Marché exécuté En A soutien aux opérations d’inventaire et attente de 2 230,000 CFN Non Non posterior 12/09/2017 aux activités de communication et paiement i pour le Pôle d'excellence A Marché exécuté En 3 Acquisition de mobilier de bureau 40,000 CFN Non Non posterior 03/09/2017 attente de i paiement A Acquisition de 175 fûts en plastique 4 40,000 CFN Non Non posterior 20/05/2018 Processus en cours pour le stockage des EPI utilisés i Contrat avec la société CALLIVOIRE En attente de 5 pour la fourniture de 20 000 224,000 ED Non Non A priori NA paiement combinaisons jetables Fourniture de supports (y compris conception) du livré des appels à A 6 communication, prospectus et autres 30,000 CFN Non Non posterior 03/11/2017 Processus en cours supports dans le cadre des Journées i scientifiques sur les pesticides 3 SOUS-TOTAL FOURNITURES 660,96 PROGEP-CI (millier $) SERVICES ASSIMILES- PROGEPCI Contrat avec GROUPE SOUNGARI Contrat signé. PUBLICITE (GSP) pour la conception de Prestation en cours 10 20, 000 ED Non Non A priori NA d’exécution sketchs et prestation d’artistes comédiens pendant la caravane Convention avec l’Union des Radios de Proximité de CI (URPCI) pour diffusion Prestation en cours 12 40, 000 ED Non Non A priori NA des contenus des spots et sketchs et d’exécution annonces Contrat avec la Radiodiffusion Télévision Ivoirienne (RTI) pour la Contrat conclu et en 13 100, 000 ED Non Non A Priori NA coproduction pour la diffusion des cours d’exécution contenus audiovisuels SOUS-TOTAL SERVICES ASSIMILES- 160,000 PROGEP-CI Taux de change utilisé : 1 $ EU= 500 F CFA 4 III. Sélection de Consultants 3.1. Seuil d’examen préalable Les contrats qui seront soumis à l'examen préalable de la Banque conformément aux dispositions de l'Annexe 1 des Directives de Sélection et Emploi de Consultants de janvier 2011 révisées en juillet 2014: Nature de Méthode de passation de Valeur Contrats soumis à dépenses marchés seuil du examen préalable contrat $EU Consultant SFQC1, SFQ2, SMC3, SCBD4, ≥ 300.000 s Tout contrat de 2.000.000 Firmes SFQC, SFQ, SMC, SCBD, QC5 < 300.000 $EU ou plus Contrat ≥ 100,000 Entente directe (*) Pas de seuil Et Audit financier Consultant Consultant individuel (AMI) ≥ 100.000 Tout contrat de 100.000 $ s EU ou plus Individuels Consultant individuel (3 CV) < 100.000 Contrat ≥ 100,000 Entente directe (*) Pas de seuil Et personnel permanent du projet Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. (*) Le justificatif de toute sélection par entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 3.2. Liste restreinte composée entièrement de Consultants Nationaux : Liste restreinte de consultants pour prestations de services, d’un coût estimatif inférieur à 300 000$ US ou équivalent par contrat, peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants 3.3. Autres arrangements spécifiques pour la sélection : Le recrutement d’un Assistant Technique à la Coordination sera effectué selon la méthode de sélection de consultant individuel. 1 SFQC : Sélection Fondée sur la Qualité et le Coût 2 SFQ : Sélection fondée sur la qualité 3 SMC : Sélection au moindre coût 4 SCBD : Sélection dans le cadre d’un budget déterminé 5 QC : Sélection basée sur les Qualifications des Consultants CI : Consultant Individuel : AMI : Avis à Manifestation d’Intérêt Prestation de services de consultants 1 2 3 4 5 6 Liste des ensembles de contrats / Description Coût estimé Méthode Ouverture Examen BM de la mission BAILLEUR sélection des offres Commentaire (Millier de Priori / A No. Description de la mission Date prévue $EU) Posteriori CONSULTANTS- PROGEP-CI Contrat avec le cabinet BEERA pour la Contrat en cours conception des fiches d'inventaire d’exécution numériques des pesticides obsolète, la 2 146, 778 ED A priori NA création d'une base de données des pesticides et l’encadrement des agents d’inventaires Contrat avec l’Expert AMMATI pour la Contrat en cours 3 formation sur les techniques d’inventaire 65, 220 ED A Priori NA d’exécution et le PSMS Contrat avec BAMASOFT NETWORK pour la conception (adaptation) et l’installation 60, 110 Contrat en cours 4 ED A priori NA de l’application en ligne « RUCHE » pour le d’exécution suivi-évaluation de l'UIAP SOUS- TOTAL CONSULTANTS PROGEP- 272 108 CI 6 PROCUREMENT Cote d'Ivoire : Obsolete Pesticides Management Project PLAN General Information Country: Cote d'Ivoire Bank’s Approval Date of the Original Procurement Plan: 2018-05-21 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P131778 GPN Date: Project Name: Obsolete Pesticides Management Project Loan / Credit No: TF / A0742, TF / 15059 Obsolete Pesticides Management Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-PROCEP-CI-65033-CW- RFQ / Réhabilitation de deux Regulatory and institutional Request for Single Stage - One 2018-12- TF / A0742 Post Limited 30,000.00 0.00 Canceled 2018-08-24 2018-10-08 (2) sites de stockages framework Quotations Envelope 07 provisoires GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PROCEP-CI-60092-GO- DIR / Contrat avec la société CALLIVOIRE pour la fourniture Management of obsolete de 20 000 combinaisons TF / A0742 pesticides and associated Prior Direct Selection Direct 224,200.00 0.00 Canceled 2017-11-14 2018-06-05 2017-11-17 2017-11-27 2017-12-27 jetables en pour les wastes superviseurs et agents d'inventaire CI-PROCEP-CI-60089-GO- Regulatory and institutional Request for Single Stage - One RFQ / CASA-1000 Working TF / A0742 Post Limited 230,000.00 0.00 Canceled 2017-09-04 2017-10-13 2017-11-12 framework Quotations Envelope Group Administrator CI-PROCEP-CI-65485-GO- Management of obsolete DIR / Contrat avec VIVO TF / A0742 pesticides and associated Prior Direct Selection Direct 136,000.00 0.00 Canceled 2018-06-15 2018-06-18 2018-06-26 2018-12-23 ENERGY pour la fourniture de wastes carburant CI-PROCEP-CI-65498-GO- DIR / Contrat avec TOTAL CI Regulatory and institutional TF / A0742 Post Direct Selection Direct 60,000.00 0.00 Canceled 2018-06-17 2018-06-22 2018-07-16 2018-11-30 pour la fourniture de framework carburant CI-PROCEP-CI-65287-GO- Management of obsolete Request for Single Stage - One RFQ / Acquisition de TF / A0742 pesticides and associated Post Limited 30,000.00 0.00 Canceled 2018-06-20 2018-07-08 2018-07-31 Quotations Envelope conteneurs wastes Management of obsolete CI-PROCEP-CI-65283-GO- Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 40,000.00 0.00 Canceled 2018-06-20 2018-07-10 2018-11-30 RFQ / Fournitures de bureau Quotations Envelope wastes CI-PROCEP-CI-38764-GO- RFQ / Conception et édition du livré des appels à Promotion of alternatives to Request for Single Stage - One communication, prospectus et TF / A0742 Post Limited 30,000.00 0.00 Canceled 2018-08-25 2018-09-23 2018-10-23 chemical pesticides Quotations Envelope autres supports dans le cadre des Journées scientifiques sur les pesticides CI-PROCEP-CI-60087-GO- Management of obsolete Pending RFQ / Acquisition de 175 fûts Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 40,000.00 0.00 Implementati 2018-06-21 2018-07-20 2018-08-21 en plastique pour le stockage Quotations Envelope wastes on des EPI utilisés CI-PROCEP-CI-60103-GO- Management of obsolete Request for Single Stage - One RFP / Acquisition de matériels TF / A0742 pesticides and associated Post Limited 22,000.00 0.00 Canceled 2018-07-02 2018-07-04 2018-07-19 2018-07-21 2018-07-31 2018-08-30 Proposals Envelope informatiques wastes CI-PROCEP-CI-66529-GO- Management of obsolete Request for Single Stage - One RFQ / Acquisition de TF / A0742 pesticides and associated Post Limited 20,000.00 0.00 Canceled 2018-07-02 2018-08-06 2018-08-27 Quotations Envelope consommables informatiques wastes CI-PROCEP-CI-60101-GO- Request for Single Stage - One RFQ / Acquisition de Mobiliers TF / A0742 Project management Post Limited 40,000.00 0.00 Canceled 2017-10-04 2017-10-19 2017-11-03 Quotations Envelope et matériels de bureau CI-PROCEP-CI-108353-GO- RFQ / Acquisition d'un Promotion of alternatives to Request for Single Stage - One TF / A0742 Post Open - National 50,000.00 0.00 Canceled 2019-04-16 2019-05-06 2019-06-05 véhicule de type 4x4 double chemical pesticides Quotations Envelope cabine CI-PROCEP-CI-108354-GO- Promotion of alternatives to Request for Single Stage - One RFQ / Acquisition de 3 motos TF / A0742 Post Open - National 15,000.00 0.00 Canceled 2019-04-14 2019-04-26 2019-04-30 chemical pesticides Quotations Envelope pour les champs pilotes CI-PROCEP-CI-108523-GO- Promotion of alternatives to Request for Single Stage - One RFQ / Acquisition de 02 TF / A0742 Post Open - National 4,000.00 0.00 Canceled 2019-04-20 2019-05-24 2019-05-27 chemical pesticides Quotations Envelope ordinateurs portables CI-PROCEP-CI-108525-GO- DIR / Contrat avec VIVO Regulatory and institutional TF / A0742 Post Direct Selection Direct 20,000.00 0.00 Canceled 2019-04-10 2019-04-15 2019-04-26 2019-04-29 ENRGY pour la fourniture de framework carburant CI-PROCEP-CI-211445-GO- Pending RFQ / ACQUISITION DE KITS Request for Single Stage - One TF / 15059 Project management Post Open - National 25,000.00 0.00 Implementati 2021-01-03 2021-02-28 2021-08-27 DE PROTECTION SANITAIRE Quotations Envelope on CONTRE LE COVID-19 Page 1 CI-PROCEP-CI-234320-GO- Pending RFQ / ACQUISITION Promotion of alternatives to Request for Single Stage - One TF / A0742 Post Limited 70,000.00 0.00 Implementati 2021-05-26 2021-06-10 2021-06-25 D'EQUIPEMENTS DE chemical pesticides Quotations Envelope on LABORATOIRE CI-PROCEP-CI-234325-GO- Pending Promotion of alternatives to Request for Single Stage - One RFQ / Acquisition de verrerie TF / A0742 Post Limited 80,000.00 0.00 Implementati 2021-05-26 2021-06-09 2021-06-23 chemical pesticides Quotations Envelope et d'accessoires d'analyse on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PROCEP-CI-60124-NC- DIR / Contrat avec la RTI pour Promotion of alternatives to la coproduction pour la TF / A0742 Prior Direct Selection Direct 100,000.00 0.00 Canceled 2017-09-25 2017-09-30 2017-10-13 2018-04-11 chemical pesticides diffusion des contenus audiovisuels CI-PROCEP-CI-65643-NC- Management of obsolete DIR / Assurance des motos Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 4,000.00 0.00 Canceled 2018-06-15 2018-07-04 2018-12-31 pour la réalisation de Quotations Envelope wastes l'inventaire CI-PROCEP-CI-65680-NC- RFQ / Conception et Regulatory and institutional Request for Single Stage - One TF / A0742 Post Limited 40,000.00 0.00 Canceled 2018-07-05 2018-07-28 2018-12-31 production de supports de framework Quotations Envelope sensibilisation CI-PROCEP-CI-65636-NC- DIR / Contrat avec ORANGE CI pour la fourniture de de crédit Management of obsolete de communication mensuelle TF / A0742 pesticides and associated Post Direct Selection Direct 76,000.00 0.00 Canceled 2018-06-18 2018-06-20 2018-06-29 2018-12-22 et de recharge data sur la wastes période de l'inventaire l'inventaire CI-PROCEP-CI-65682-NC- Management of obsolete DIR / Contrat avec CFAO pour TF / A0742 pesticides and associated Post Direct Selection Direct 45,000.00 0.00 Canceled 2018-06-14 2018-06-17 2018-07-01 2018-12-31 l'entretien et la réparation des wastes véhicules CI-PROCEP-CI-65683-NC- DIR / Contrat avec TRACTAFRIC MOTORS Promotion of alternatives to TF / A0742 Post Direct Selection Direct 10,000.00 0.00 Canceled 2018-06-14 2018-06-15 2018-06-29 2018-12-31 (AFRICAUTO) pour la chemical pesticides réparation des véhicules HYUNDAI et MAZDA CI-PROCEP-CI-65778-NC- Under Promotion of alternatives to Request for Single Stage - One RFQ / Production d'une revue TF / A0742 Post Limited 6,000.00 0.00 Implementati 2018-07-06 2018-08-27 2018-07-26 2018-12-31 chemical pesticides Quotations Envelope semestrielle spécialisée on CI-PROCEP-CI-65783-NC- Promotion of alternatives to Request for Single Stage - One RFQ / Production de supports TF / A0742 Post Limited 40,000.00 0.00 Canceled 2018-07-13 2018-08-13 2018-12-31 chemical pesticides Quotations Envelope de communication CI-PROCEP-CI-65786-NC- RFQ / Production de gadgets Regulatory and institutional Request for Single Stage - One TF / A0742 Post Limited 30,000.00 0.00 Canceled 2018-08-28 2018-10-12 2018-12-19 et autres supports de fin de framework Quotations Envelope fin dannée CI-PROCEP-CI-65775-NC- Promotion of alternatives to Request for Single Stage - One RFQ / Maintenance et TF / A0742 Post Limited 6,000.00 0.00 Canceled 2018-07-18 2018-08-05 2018-12-31 chemical pesticides Quotations Envelope promotion du site internet CI-PROCEP-CI-66551-NC- Management of obsolete RFQ / Collecte et transport Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 60,000.00 0.00 Canceled 2018-09-16 2018-11-01 2018-12-31 des PODA vers les sites de Quotations Envelope wastes stockage provisoire CI-PROCEP-CI-66749-NC- Management of obsolete RFQ / Assurance multirisques Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 8,000.00 0.00 Canceled 2018-07-02 2018-08-08 2018-12-12 professionnelles et individuel Quotations Envelope wastes accident CI-PROCEP-CI-66563-NC- RFQ / Organisation d'une Promotion of alternatives to Request for Single Stage - One campagne sur les journées TF / A0742 Post Limited 30,000.00 0.00 Canceled 2018-08-05 2018-09-12 2018-10-31 chemical pesticides Quotations Envelope scientifiques, achat d'espaces et couverture médiatique CI-PROCEP-CI-108362-NC- DIR / Convention avec l'Association Ivoirienne des Promotion of alternatives to Sciences Agronomiques (AISA) TF / A0742 Prior Direct Selection Direct 173,240.00 0.00 Canceled 2019-04-08 2019-04-10 2019-04-25 2021-04-14 chemical pesticides pour la mise en place et la gestion de champs pilotes de démonstration CI-PROCEP-CI-108527-NC- RFQ / Production de supports Management of obsolete Request for Single Stage - One de sensibilisation et de TF / A0742 pesticides and associated Post Open - National 15,000.00 0.00 Canceled 2019-05-13 2019-06-05 2019-07-20 Quotations Envelope supports de communication et wastes gadgets CI-PROCEP-CI-108530-NC- Management of obsolete Request for Single Stage - One RFQ / Réalisation et diffusion TF / A0742 pesticides and associated Post Open - National 26,000.00 0.00 Canceled 2019-05-26 2019-07-21 2019-07-25 Quotations Envelope d'un film sur les pesticides wastes Management of obsolete CI-PROCEP-CI-108532-NC- Request for Single Stage - One TF / A0742 pesticides and associated Post Open - National 40,000.00 0.00 Canceled 2019-05-05 2019-06-02 2019-06-06 RFQ / Dialogue production Quotations Envelope wastes Page 2 CI-PROCEP-CI-108538-NC- RFQ / Entretien et réparation Regulatory and institutional Request for Single Stage - One des installations électriques TF / A0742 Post Open - National 14,000.00 0.00 Canceled 2019-04-27 2019-05-20 2019-05-23 framework Quotations Envelope (climatiseurs, électricité) et sanitaires CI-PROCEP-CI-108542-NC- RFQ / Entretien et Regulatory and institutional Request for Single Stage - One TF / A0742 Post Open - National 10,000.00 0.00 Canceled 2019-04-28 2019-05-14 2019-05-17 maintenance du matériel framework Quotations Envelope informatique CI-PROCEP-CI-108544-NC- DIR / Assurance du personnel Regulatory and institutional TF / A0742 Post Direct Selection Direct 20,000.00 0.00 Canceled 2019-04-03 2019-04-08 2019-04-25 2020-04-24 (maladie et individuelle framework accident) CI-PROCEP-CI-108546-NC- Regulatory and institutional TF / A0742 Post Direct Selection Direct 15,000.00 0.00 Canceled 2019-04-03 2019-04-08 2019-04-10 2020-04-09 DIR / Assurance des véhicules framework CI-PROCEP-CI-108552-NC- Regulatory and institutional Request for Single Stage - One RFQ / Assurance multirisques TF / A0742 Post Open - National 2,000.00 0.00 Canceled 2019-04-14 2019-05-06 2019-05-08 framework Quotations Envelope professionnelles CI-PROCEP-CI-108554-NC- DIR / Entretien et Regulatory and institutional TF / A0742 Post Direct Selection Direct 8,400.00 0.00 Canceled 2019-04-08 2019-04-09 2019-04-20 2019-05-26 maintenance du logiciel de framework financière (TOMPRO et TOMPAIE) CI-PROCEP-CI-108558-NC- Regulatory and institutional Request for Single Stage - One RFQ / Entretien et réparation TF / A0742 Post Open - National 20,000.00 0.00 Canceled 2019-04-15 2019-05-12 2019-05-15 framework Quotations Envelope des véhicules CI-PROCEP-CI-108559-NC- RFQ / Installation d'un Regulatory and institutional Request for Single Stage - One TF / A0742 Post Open - National 24,000.00 0.00 Canceled 2019-04-21 2019-05-14 2019-06-19 système d'archivage framework Quotations Envelope électronique et physique CI-PROCEP-CI-108536-NC- RFQ / Contrat avec RMG COTE Pending D'IVOIRE SA pour la collecte, Single Stage - One TF / A0742 Project management Post Request for Bids Open - National 899,750.00 0.00 Implementati 2019-05-14 2019-05-19 2019-05-22 2019-05-23 2019-06-20 2019-12-17 le transport et l'élimination Envelope on des pesticides obsolètes et déchets associés CI-PROCEP-CI-148882-NC- DIR / Contrat avec la société RMG COTE D'IVOIRE pour la Management of obsolete Pending sauvegarde, la pré-collecte, la TF / A0742 pesticides and associated Post Direct Selection Direct 899,750.00 0.00 Implementati 2020-02-20 2020-02-25 2020-03-21 2020-05-20 collecte, le transport et wastes on l'élimination des pesticides obsolètes et déchets associés (PODA) CI-PROCEP-CI-65791-NC- RFQ / Contrat avec l'assureur Pending WILILS TOWERS pour TF / A0742 Project management Post Direct Selection Direct 4,000.00 0.00 Implementati 2019-12-12 2019-12-15 2020-01-01 2020-12-26 Couverture assurance maladie on du personnel CI-PROCEP-CI-148883-NC- DIR / Contrat avec le Centre Médical CHENAL pour la Management of obsolete Pending réalisation des tests de TF / A0742 pesticides and associated Post Direct Selection Direct 12,600.00 0.00 Implementati 2019-12-13 2019-12-16 2019-12-28 2020-02-26 cholinestérase post-inventaire wastes on sur les agents ayant réalisé l'inventaire des pesticides CI-PROCEP-CI-211446-GO- RFQ / EDITION DE DOCUMENTS CLES ( GUIDE Management of obsolete Pending JURIDIQUE, GUIDE Request for Single Stage - One TF / A0742 pesticides and associated Post Open - National 13,000.00 0.00 Implementati 2021-01-03 2021-02-28 2021-08-27 INVENTAIRE, INDEX Quotations Envelope wastes on PHYTOSANITAIRE) POUR LA GESTION DURABLE DES PESTICIDES CI-PROCEP-CI-211447-CS- CDS / PRODUCTION ET Pending DIFFUSION D'UN TELEFILM SUR Promotion of alternatives to TF / 15059 Post Direct Selection Direct 80,000.00 0.00 Implementati 2020-12-30 2021-01-04 2021-02-08 2021-08-07 LES PESTICIDES EN COTE chemical pesticides on D'IVOIRE ( CONTRAT AVEC CIPROFILM) CI-PROCEP-CI-211451-NC- RFQ / RECRUTEMENT D'UNE AGENCE DE COMMUNICATION Pending POUR LA COUVERTURE Request for Single Stage - One TF / A0742 Project management Post Open - National 29,000.00 0.00 Implementati 2021-01-05 2021-03-02 2021-08-29 MEDIATIQUE DES EVENEMENTS Quotations Envelope on MAJEURS ET LA DISSEMINATION DES ACQUIS DU PROJET. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PROCEP-CI-65876-CS- CQS / Evaluation Consultant Regulatory and institutional environnementale et sociale TF / A0742 Post Qualification Open - National 50,000.00 0.00 Canceled 2018-06-26 2018-07-02 2018-07-23 2018-07-31 2018-08-31 2018-09-30 framework de deux (02) sites de Selection stockages CI-PROCEP-CI-65973-CS- CQS / Analyse de pesticides et Consultant Promotion of alternatives to de résidus de pesticides dans TF / A0742 Post Qualification Open - National 60,000.00 0.00 Canceled 2018-08-15 2018-08-21 2018-09-07 2018-09-13 2018-10-03 2018-12-03 chemical pesticides les différents milieux Selection environnementaux Page 3 CI-PROCEP-CI-65880-CS- QCBS / Etude technique et Management of obsolete Quality And Cost- Suivi des travaux de TF / A0742 pesticides and associated Post Open - National 44,000.00 0.00 Canceled 2019-05-08 2019-05-16 2019-06-01 2019-06-01 2019-06-01 2019-06-01 2019-06-21 2019-08-20 Based Selection construction des sites de wastes stockage CI-PROCEP-CI-108364-CS- CQS / Recrutement d'un Consultant laboratoire pour des Promotion of alternatives to TF / A0742 Post Qualification Open - National 160,000.00 0.00 Canceled 2019-04-03 2019-04-18 2019-04-23 2019-04-30 2019-05-12 2019-07-11 recherches de résidus dans chemical pesticides Selection les différentes spéculations traitées CI-PROCEP-CI-108365-CS- CQS / Etude d'impact Consultant Promotion of alternatives to environnemental et social et TF / A0742 Post Qualification Open - National 60,000.00 0.00 Canceled 2019-05-21 2019-06-11 2019-07-02 2019-07-09 2019-07-24 2019-09-22 chemical pesticides l'audit environnemental des Selection sites de stockage provisoire CI-PROCEP-CI-65887-CS- QCBS / Audit comptable et Quality And Cost- Pending TF / A0742 Project management Post Open - National 20,000.00 0.00 2020-02-24 2020-03-04 2020-04-02 2020-05-03 2020-05-05 2020-05-10 2020-06-11 2020-11-09 financier des exercices 2019 Based Selection Implementation et 2020 du PROGEP-CI CI-PROCEP-CI-161237-CS- CQS / Recrutement d'un Consultant Regulatory and institutional cabinet pour l'élaboration de TF / A0742 Post Qualification Open - National 60,000.00 0.00 Under Review 2020-02-28 2020-03-04 2020-03-14 2020-03-28 2020-04-04 2020-04-10 2020-06-09 framework la stratégie de communication Selection du PROGEP-CI CI-PROCEP-CI-176324-CS- CQS / Recrutement d'un Management of obsolete Consultant Pending Consultant individuel pour TF / A0742 pesticides and associated Post Qualification Open - National 30,000.00 0.00 2020-12-08 2020-12-15 2020-12-25 2020-12-30 2021-01-10 2021-02-09 Implementation l'évaluation finale du PROGEP- wastes Selection CI CI-PROCEP-CI-176329-CS- Consultant CQS / Recrutement d'un Promotion of alternatives to Pending TF / A0742 Post Qualification Open - National 60,000.00 0.00 2020-11-30 2020-12-14 2020-12-29 2021-01-01 2021-01-13 2021-02-03 cabinet pour la formation des chemical pesticides Implementation Selection techniciens de laboratoires CI-PROCEP-CI-65818-CS- QCBS / Elaboration de la Regulatory and institutional Quality And Cost- Pending TF / A0742 Post Open - National 60,000.00 0.00 2018-06-21 2018-06-28 2018-07-17 2018-08-20 2018-08-24 2018-08-28 2018-09-10 2018-11-09 stratégie de communication framework Based Selection Implementation du PROGEP-CI INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PROCEP-CI-60105-CS- CDS / Contrat avec le cabinet BEERA pour la conception des fiches d'inventaire Management of obsolete Pending numériques des pesticides TF / A0742 pesticides and associated Post Direct Selection Direct 146,778.00 0.00 2017-07-03 2017-07-07 2017-07-24 2018-01-20 Implementation obsolète, la création d'une wastes base de données des pesticides et l'encadrement des agents d'inventaires t CI-PROCEP-CI-65845-CS- Management of obsolete CDS / Contrat avec le cabinet Under TF / A0742 pesticides and associated Post Direct Selection Direct 100,000.00 0.00 2018-06-21 2018-07-04 2018-07-20 2018-12-31 BEERA pour la mise en place Implementation wastes de l'interface « VALIDATOR » CI-PROCEP-CI-65837-CS- Individual Regulatory and institutional INDV / Formation des TF / A0742 Post Consultant Limited 10,000.00 0.00 Canceled 2018-08-02 2018-08-17 2018-08-30 2018-09-10 2018-09-30 framework techniciens de laboratoires Selection CI-PROCEP-CI-65809-CS- Individual INDV / Elaboration d'avant Regulatory and institutional Pending TF / A0742 Post Consultant Limited 14,000.00 0.00 2018-06-18 2018-06-23 2018-07-02 2018-07-16 2018-08-20 projets de lois sur la gestion framework Implementation Selection des pesticides CI-PROCEP-CI-65856-CS- Management of obsolete Individual INDV / Elaboration de la TF / A0742 pesticides and associated Post Consultant Limited 10,500.00 0.00 Canceled 2018-08-09 2018-08-11 2018-08-25 2018-09-06 2018-10-10 stratégie nationale de wastes Selection pesticides et déchets associés CI-PROCEP-CI-66041-CS- CDS / Mise en place et la gestion des champs pilotes de Promotion of alternatives to démonstration dans les zones TF / A0742 Post Direct Selection Direct 60,000.00 0.00 Canceled 2018-06-20 2018-07-02 2018-07-23 2018-12-31 chemical pesticides cotonnière, cacaoyère et vivrière : Contrat avec CEA- CCBAD CI-PROCEP-CI-66047-CS- CDS / Mise en place et gestion des champs pilotes de démonstration dans les zones Promotion of alternatives to TF / A0742 Post Direct Selection Direct 40,000.00 0.00 Canceled 2018-06-20 2018-06-30 2018-08-06 2018-12-31 cotonnière, cacaoyère et chemical pesticides vivrière : Contrat avec l'Association Ivoirienne des Sciences Agronomiques (AISA) CI-PROCEP-CI-60119-CS- CDS / Contrat avec l'Expert Management of obsolete AMMATI pour la formation sur Pending TF / A0742 pesticides and associated Post Direct Selection Direct 65,220.00 0.00 2017-03-16 2017-03-18 2017-04-12 2018-12-31 les techniques d'inventaire Implementation wastes l'encadrement des agents d'inventaire CI-PROCEP-CI-60115-CS- CDS / Contrat avec BAMASOFT NETWORK pour la conception (adaptation) et l'installation de Regulatory and institutional TF / A0742 Post Direct Selection Direct 60,110.00 0.00 Canceled 2017-06-01 2017-06-04 2017-07-22 2018-11-28 l'application en ligne « RUCHE framework » pour le suivi-évaluation de l'UIAP Procurement of individual heating substations Page 4 CI-PROCEP-CI-108355-CS- INDV / Recrutement d'un consultant individuel pour la Individual réalisation de l'état des lieux Regulatory and institutional TF / A0742 Post Consultant Open 60,000.00 0.00 Canceled 2019-04-30 2019-05-30 2019-06-06 2019-06-21 2019-08-20 (personnel et équipement) des framework Selection laboratoires d'analyses des pesticides et la formation du personnel CI-PROCEP-CI-108361-CS- CDS / Contrat avec le cabinet BEERA TECHNOLOGY pour le Management of obsolete Pending développement du module de TF / A0742 pesticides and associated Post Direct Selection Direct 234,000.00 0.00 2019-04-01 2019-04-05 2019-04-14 2019-06-13 Implementation traitement des données du wastes Système d'Information des pesticides CI-PROCEP-CI-108363-CS- CDS / Convention le CEA- Promotion of alternatives to Pending TF / A0742 Post Direct Selection Direct 199,060.00 0.00 2019-05-07 2019-05-13 2019-05-27 2021-05-16 CCBAD pour la réalisation des chemical pesticides Implementation tests de biopesticides CI-PROCEP-CI-108366-CS- Individual INDV / Recrutement d'un TF / A0742 Project management Post Consultant Open 21,000.00 0.00 Canceled 2019-04-08 2019-05-02 2019-05-04 2019-05-27 2021-08-14 Assistant comptable Selection CI-PROCEP-CI-108367-CS- Individual INDV / Recrutement d'un TF / A0742 Project management Post Consultant Open 7,200.00 0.00 Canceled 2019-04-08 2019-05-02 2019-05-04 2019-05-16 2021-08-03 chauffeur Selection CI-PROCEP-CI-159877-CS- INDV / Recrutement d'un consultant pour une session Individual de formation de 5 jours au Regulatory and institutional TF / A0742 Post Consultant Open 70,000.00 0.00 Canceled 2020-03-20 2020-04-21 2020-04-28 2020-05-15 2020-07-14 profit de 15 techniciens des framework Selection laboratoires publics d'analyses et de prélèvement sélectionnés CI-PROCEP-CI-175732-CS- INDV / Recrutement d'un consultant individuel pour Management of obsolete Individual Pending l'évaluation de la mise en TF / A0742 pesticides and associated Post Consultant Open 10,000.00 0.00 2020-11-30 2021-01-03 2021-01-08 2021-01-20 2021-02-19 Implementation oeuvre du Cadre de Gestion wastes Selection Environnementale et Sociale du PROGEP-CI CI-PROCEP-CI-211456-CS- INDV / RECRUTEMENT D'UN Management of obsolete Individual CONSULTANT INDIVIDUEL Under TF / A0742 pesticides and associated Post Consultant Open 20,000.00 0.00 2021-01-07 2021-02-25 2021-03-18 2021-04-22 2021-10-19 POUR L'ELABORATION DU Implementation wastes Selection GUIDE NATIONAL DES BIOPESTICIDES CI-PROCEP-CI-211457-CS- INDV / ELABORATION DES SOUS- SYSTEME Management of obsolete Pending D'UTILISATION, TF / A0742 pesticides and associated Post Direct Selection Direct 56,000.00 0.00 2021-01-06 2021-01-16 2021-03-22 2021-09-18 Implementation DE'HOMOLOGATION ET LES wastes LIENS AVEC LES SITES EXISTANTS CI-PROCEP-CI-211459-CS- INDV / RECRUTEMENT D'UN CONSULTANT INDIVIDUEL Management of obsolete Individual Pending POUR LA CONNEXION AUX TF / A0742 pesticides and associated Post Consultant Open 17,400.00 0.00 2021-01-12 2021-03-02 2021-03-23 2021-04-27 2021-10-24 Implementation INTERFACES DES SYSTEMES wastes Selection D'INFORMATION SUR LES PESTICIDES CI-PROCEP-CI-211467-CS- CDS / CONTRAT AVEC BEERA Management of obsolete POUR L'ABONNEMENT ET LA Pending TF / A0742 pesticides and associated Post Direct Selection Direct 30,000.00 0.00 2021-01-14 2021-01-24 2021-03-30 2021-09-26 MAINTENANCE DU SYSTEME Implementation wastes D'INFORMATION SUR LES PESTICIDES CI-PROCEP-CI-211454-CS- INDV / RECRUTEMENT D'UN Management of obsolete Individual CONSULTANT POUR TF / A0742 pesticides and associated Post Consultant Open 20,000.00 0.00 Canceled 2021-01-06 2021-02-24 2021-03-17 2021-04-21 2021-10-18 L'ELABORATION DU RAPPORT wastes Selection FINAL DU CGES CI-PROCEP-CI-234334-CS- CDS / CONTRAT AVECLE CONSULTANT AMMATI POUR L'ÉVALUATION FINALE DU Management of obsolete PROGEP-CI ET DE LA MISE EN TF / A0742 pesticides and associated Post Direct Selection Direct 50,000.00 0.00 Under Review 2021-05-27 2021-05-31 2021-05-30 2021-06-02 2021-06-27 ŒUVRE DU CADRE DE wastes GESTION DE LA GESTION ENVIRONNMETALE ET SOCIALE (CGES) Page 5 SUMMARY O F PROCUREMENT PLAN Project Preparation Advancement Project information: Liberia Integrated Public Financial Management Reform Project II P165000 Project Implementation agency: Ministry of Finance and Development Planning Date of the Procurement Plan: April 24, 2018 Period covered by this Procurement Plan: July 1, 2017- December 31, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 1, 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the IPFMRP II): Thresholds*, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] All contracts at or above USD Open Competition 5,000,000 are subject to International Market international advertising and C ≥ 5,000,000 Approach and Direct the use of the Bank’s SPDs (or Contracting other documents agreed with the Bank). 1 Works Open Competition National Market 200,000 < C < 5,000,000 None Approach C ≤ 200,000 RfQ None All contracts at or above USD Open Competition 500,000 are subject to International Market international advertising and C ≥ 500,000 Approach and Direct the use of the Bank’s SPDs (or Goods, IT and Contracting other documents agreed with 2 non-consulting the Bank). services Open Competition 100,000 < C < 500,000 National Market None Approach C ≤ 100,000 RfQ None All contracts at or above USD 100,000 are subject to for international advertising and C < 100,000 Consulting Services the use of the Bank’s SPDs (or National other documents agreed with shortlist for the Bank). 3 selection of All contracts at or above USD consultant firms for 200,000 are subject to Engineering and international advertising and C ≤ 200,000 Construction the use of the Bank’s SPDs (or Supervision other documents agreed with the Bank). Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Selection of All values ≥ 100,000 4 Individual All Approaches consultants Training, Based on approved Workshops, This line activity is not subject 5 All Values Annual Work Plan & Study Tours to Procurement Review. Budgets (AWPB) by TTL (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will need for prequalification in the procurement arrangements under IPFMRP II *These thresholds are for the purposes of the initial procurement plan for the PPA and for first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The IPFMRP II Program team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Works There are no works under the Project Preparation Advance Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimat Selection Review Expecte Expecte Expecte Comme No. Assignment ed Method/ by Bank d date d d nts Cost in Arrangem (Prior / of Contrac Completi US$ ent Post) proposa t on l Signatu Date submiss re ion Date 1. SLA for Wimax 99,000.0 RFQ Post N/A 21 Sep 31 Aug 18 Complet 0 17 e 2. SLA for Battery 52,998.0 DS Post N/A 27 Jul 17 31 Jul 18 Complet Bank 0 e 3. SLA for Data Center 52,998.0 RFQ Post N/A 27 Jul 17 20 Jul 18 Complet 0 e 4. Firm to configure 750,000. RFB (IMA) Prior 10 Jul 17 21 Nov 20 May and roll out SIGTAS 00 17 18 to revenue collection point 5. Procurement of 551,860. RFB (NMA) Post N/A 22 Jan 18 15 Jun 18 Evaluatio hardware, data 00 n Report storage, network & under communication review devices, and licenses, etc. to secure stability of SIGTAS 6. Procurement of a 28,000.0 RFQ Post N/A 5 Mar 18 30 Apr 18 Complet Vehicle for LRA to 0 e facilitate Regional Dialogue on DRM Consultancy Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimate Selection Review Expecte Expecte Expected Comments No. Assignment d Method/ by Bank d date d Completi Cost in Arrangem (Prior / of Contrac on US$ ent Post) proposa t Date l submiss Signatu ion re Date 1. PSM for various 143,954.0 DS Post 05 Jul 17 28 Jul 17 30 Jun 18 Received IDA FreeBalance 0 No objection Application for Direct Modules Selection 2. TA (ITAS Advisor) 271,014.0 IC Post 15 Jan 18 21 Feb 30 Jun 18 ToR submitted; to provide support 0 18 Received IDA for system No Objection. stability Complete 3. TA to cost and 45,000.00 IC Post 6 Dec 17 15 Jan 18 21 Mar 18 ToR submitted; validate the Received IDA Domestic No Objection. Resource Complete. Mobilization Strategy 4. TA (Senior DBA) 132,000.0 IC Post 6 Dec 17 15 Jan 18 30 Jun 18 ToR submitted; to provide support 0 Received IDA to SIGTAS No Objection. stability Complete 5. TA (Local ITAS 72,000.00 IC Post 6 Dec 17 15 Jan 18 30 Jun 18 ToR submitted; Advisor) to Received IDA provide support No Objection. for the stability of Complete the current SIGTAS System 6. TA to conduct 150,000.0 CQS Post 6 Dec 17 30 Jan 18 26 Mar 18 ToR to be Business Process 0 submitted to Reengineering of IDA for Review the ITAS for LRA and No Objection. 7. TA to develop 25,000.00 IC Post 20 Jul 17 29 Sep 28 Mar 18 ToR to be Open Budget 17 submitted to national action IDA for Review plan and No Objection. 8. TA to undertake 190,000.0 CQS Post 12 Jul 17 21 Sep 20 Mar 18 ToR submitted; PFM/Procurement 0 17 Received IDA Capacity Needs No Objection. Assessment and Complete. develop Capacity building strategy 9. TA to develop the 50,000.00 CQS Post 03 Jul 17 13 Sep 12 Nov 17 ToR to be M&E Results 17 submitted to Framework for the IDA for Review PFM Strategy and No Objection. 10. International DS Prior 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Procurement Received IDA Specialist No Objection. 199,800.00 Complete 11. Data Center DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Manager Received IDA No Objection. 90,000.00 Complete 12. M & E Officer DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Received IDA No Objection. 45,000.00 Complete 13. Change DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Management Received IDA Officer No Objection. 45,000.00 Complete 14. Administration DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Officer Received IDA No Objection. 36,000.00 Complete 15. Data Base DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Administrator 1 Received IDA No Objection. 72,000.00 Complete 16. Data Base DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Administrator 2 Received IDA No Objection. 72,000.00 Complete 17. Economic DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Consultant 54,000.00 Received IDA No Objection. Complete 18. Administrative DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted, Assistant Received IDA No Objection. 12,600.00 Complete 19. NSA Coordinator DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Received IDA No objection. 54,000.00 Complete 20. Grant Finance DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Officer received IDA No Objection. 27,000.00 Complete 21. Senior Assistant DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Internal Auditor received IDA No Objection. 45,000.00 Complete 22. Assistant Internal DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Auditor received IDA No Objection. 36,000.00 Complete 23. Senior Assistant DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; Project Account received IDA No Objection. 36,000.00 Complete 24. Sylvia A. Squire DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; received IDA No Objection. 47,817.00 Complete 25. Kehleboe Gongloe DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; received IDA No Objection. 93,600.00 Complete 26. Jenkins T. Taylor DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; received IDA No Objection. 77,400.00 Complete 27. Gariston W. Bailey DS Post 05 Jul 17 02 Aug 17 30 Jun 18 ToR submitted; received IDA No Objection. 75,600.00 Complete Training and Workshop (Training & Workshop activities are subject to TTL clearance). Estima Estimated Expected Ref. Training, workshop and ted Duration Training/workshop No. study tours Cost in (Days) Date (US$) National Revenue Summit 10,000. 1. 00 28 9 Apr 18 Validation of national open 25,000. 2. budget national action plan 00 20 16 Apr 18 Validate PFM/Procurement 10,000. 3. Needs Assessment and 00 10 02 Apr 18 Capacity Building Strategy GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) the salaries of locally contracted support staff of the Project entities and units involved in Project implementation (excluding civil servants) and state contributions thereon; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance and insurance; (iv) communication technology (including, without limitation, internet and telephone) and maintenance of equipment; (v) rental expenses and utilities; (vi) building security and maintenance; (vii) translations services, photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: PROCUREMENT Liberia : Public Financial Management Reforms for Institutional Strengthening PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2019-01-15 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165000 GPN Date: 2019-11-01 Project Name: Public Financial Management Reforms for Institutional Strengthening Loan / Credit No: IDA / V1080, IDA / D5060 M Executing Agency(ies): inistry of Finance and Development Planning WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MFDP-97556-GO-RFB / 1: Enhancing DRM Sources Single Stage - One Procurement of Hardware IDA / V1080 Post Request for Bids Open - National 551,860.00 0.00 Canceled 2018-01-22 2018-01-27 2018-03-10 2018-04-09 2018-05-14 2018-07-31 and Systems Envelope Data Storage and Network Devices LR-MFDP-97544-GO-RFQ / 1: Enhancing DRM Sources Request for Single Stage - One Procurement of Laptops for IDA / V1080 Post Limited 8,635.00 8,430.00 Completed 2018-08-25 2018-08-27 2018-10-20 2018-09-14 2018-10-30 2018-10-24 and Systems Quotations Envelope LRA LR-MFDP-97550-GO-RFQ / 1: Enhancing DRM Sources Request for Single Stage - One Procurement of Vehicle for IDA / V1080 Post Limited 28,000.00 28,000.00 Completed 2018-02-12 2018-02-07 2018-04-09 2018-05-21 2018-06-04 2018-06-04 and Systems Quotations Envelope LRA LR-MFDP-145523-GO-RFQ / Procurement of 10 doors, 200 3: Improving Public-Sector Under chairs, 2 overhead projectors, Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 100,000.00 0.00 Implementati 2019-12-21 2020-08-03 2020-02-15 2020-08-13 1 speaker stand and 10 air Quotations Envelope Oversight and Accountability on conditions for UL Resource Center PFMRISP-REF-11 / Request for Single Stage - One Procurement of 4 office chairs IDA / D5060 5: Project Management Post Limited 30,000.00 0.00 Canceled 2020-01-25 2020-03-21 2020-06-19 Quotations Envelope and 3 desks for PMU LR-MFDP-151032-GO-RFB / Procurement of Desktops, 1: Enhancing DRM Sources Single Stage - One IDA / D5060 Post Request for Bids Open - National 300,000.00 0.00 Canceled 2020-01-06 2020-01-06 2020-01-11 2020-01-06 2020-02-22 2020-02-10 2020-03-23 2020-04-27 2020-10-24 Laptops and Other Office and Systems Envelope Equipment LR-MFDP-151054-GO-RFQ / Procurement of 4 chairs and 3 Request for Single Stage - One IDA / D5060 5: Project Management Post Limited 5,000.00 3,165.00 Completed 2020-01-17 2020-02-07 2020-03-13 2020-02-10 2020-09-09 2020-02-28 desks for Project Management Quotations Envelope Unit LR-MFDP-145295-GO-RFQ / 3: Improving Public-Sector Request for Single Stage - One Procurement and Installation IDA / D5060 Capacity for Enhanced Post Limited 70,000.00 0.00 Canceled 2019-12-25 2020-02-19 2020-08-17 Quotations Envelope of CAAT software for IAA Oversight and Accountability 3: Improving Public-Sector LR-MFDP-152772-GO-RFQ / Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 150,000.00 72,500.00 Completed 2020-01-20 2020-01-07 2020-03-16 2020-02-07 2020-09-12 2020-06-11 Procurement of 4 vehicles Quotations Envelope Oversight and Accountability LR-MFDP-163495-GO-RFQ / 4: Improving Upstream and Request for Single Stage - One Procurement of 3 vehicles for IDA / D5060 Downstream PFM Systems in Post Limited 135,000.00 89,500.00 Signed 2020-03-23 2020-03-18 2020-05-18 2020-05-05 2020-11-14 Quotations Envelope RCU, PMU and DMA Selected Sectors LR-MFDP-164547-GO-RFB / 2: Stabilizing and Procurement of Desktops, Strengthening Performance of Single Stage - One IDA / D5060 Post Request for Bids Open - National 450,000.00 0.00 Canceled 2020-03-24 2020-03-29 2020-05-10 2020-06-09 2020-07-14 2021-01-10 Laptops and Other Office Financial Controls and Envelope Equipment Systems LR-MFDP-170135-GO-RFB / Procurement of Desktops, 1: Enhancing DRM Sources Single Stage - One IDA / D5060 Post Request for Bids Open - National 450,000.00 291,956.00 Signed 2020-01-06 2020-01-06 2020-01-11 2020-02-22 2020-02-10 2020-03-23 2020-05-12 2020-04-27 2020-07-28 2020-10-24 Laptops, Printers and Other and Systems Envelope ICT Equipment 2: Stabilizing and LR-MFDP-150793-GO-RFQ / Strengthening Performance of Request for Single Stage - One Refurbishment of the IFMIS IDA / D5060 Post Limited 50,000.00 0.00 Canceled 2020-01-04 2020-02-29 2020-08-27 Financial Controls and Quotations Envelope Training Room Systems LR-MFDP-196967-GO-RFQ / 2: Stabilizing and Procurement of Scanners and Pending Strengthening Performance of Request for Single Stage - One printers for rollout of IDA / D5060 Post Limited 15,000.00 0.00 Implementati 2020-12-20 2021-02-14 2021-08-13 Financial Controls and Quotations Envelope Electronic Data Management on Systems System LR-MFDP-197169-GO-RFQ / 3: Improving Public-Sector Procurement of 1 laptop, Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 3,000.00 2,930.00 Completed 2020-11-15 2020-11-19 2021-01-10 2020-11-24 2021-07-09 2020-12-02 desks, printer, projector and Quotations Envelope Oversight and Accountability camera for NSA LR-MFDP-196983-GO-RFQ / Procurement of 10 air 3: Improving Public-Sector Pending Request for Single Stage - One conditioners, projectors and IDA / D5060 Capacity for Enhanced Post Limited 20,000.00 0.00 Implementati 2020-11-15 2021-01-10 2021-07-09 Quotations Envelope electronic equpiment for the Oversight and Accountability on University of Liberia LR-MFDP-196956-GO-RFQ / 3: Improving Public-Sector Pending Procurement of resource Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Open - International 100,000.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 materials (text books) for the Quotations Envelope Oversight and Accountability on University of Liberia Page 1 LR-MFDP-196925-GO-RFQ / Pending Procurement of 5 laptops, 3 Request for Single Stage - One IDA / D5060 5: Project Management Post Limited 20,000.00 0.00 Implementati 2020-09-07 2020-11-02 2021-05-01 desks and 1 printer & Quotations Envelope on catridges for PMU LR-MFDP-197180-GO-RFQ / Procurement of one vehicle Request for Single Stage - One IDA / D5060 5: Project Management Post Limited 60,000.00 54,461.00 Signed 2020-11-21 2020-10-06 2021-01-16 2020-12-15 2021-07-15 for Office of the Minister of Quotations Envelope Finance 2: Stabilizing and LR-MFDP-200528-GO-RFQ / Pending Strengthening Performance of Request for Single Stage - One Refurbishment of the IFMIS IDA / D5060 Post Limited 75,000.00 0.00 Implementati 2020-12-18 2021-02-12 2021-08-11 Financial Controls and Quotations Envelope Training Room at MFDP on Systems 2: Stabilizing and LR-MFDP-203883-GO-RFQ / Strengthening Performance of Request for Single Stage - One Procurement of Hardware for IDA / D5060 Post Limited 85,000.00 72,473.00 Completed 2021-01-11 2020-11-23 2021-03-08 2020-12-15 2021-09-04 2021-01-07 Financial Controls and Quotations Envelope EFT Implementation Systems LR-MFDP-203882-GO-RFQ / 3: Improving Public-Sector Refurbishment of the Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 30,000.00 27,501.64 Signed 2021-01-13 2020-12-01 2021-03-10 2021-02-10 2021-09-06 University of Liberia Resource Quotations Envelope Oversight and Accountability Center LR-MFDP-197168-GO-RFQ / Procurement of office Request for Single Stage - One IDA / D5060 5: Project Management Post Limited 25,000.00 0.00 Canceled 2021-03-29 2021-05-24 2021-11-20 furniture (desks and chairs) Quotations Envelope for PMU LR-MFDP-196969-GO-RFQ / 2: Stabilizing and Procurement of incident Strengthening Performance of Request for Single Stage - One IDA / D5060 Post Limited 50,000.00 0.00 Canceled 2021-02-15 2021-04-12 2021-10-09 management software (help Financial Controls and Quotations Envelope desk) Systems LR-MFDP-225491-GO-RFQ / 3: Improving Public-Sector Pending Procurement of Servers and Request for Single Stage - One IDA / D5060 Capacity for Enhanced Post Limited 35,000.00 0.00 Implementati 2021-01-27 2021-03-24 2021-09-20 Software for Pentana Quotations Envelope Oversight and Accountability on Implementation LR-MFDP-145528-GO-DIR / 4: Improving Upstream and Procurement of STATA for IDA / D5060 Downstream PFM Systems in Post Direct Selection Direct 5,400.00 0.00 Canceled 2020-01-16 2020-01-21 2020-02-25 2020-08-23 PETS Selected Sectors LR-MFDP-145144-GO-RFQ / 4: Improving Upstream and Procurement of 2 Windows Request for Single Stage - One IDA / D5060 Downstream PFM Systems in Post Open - National 67,500.00 0.00 Canceled 2019-12-15 2020-02-09 2020-08-07 Servers and backup, and Quotations Envelope Selected Sectors operating systems licenses LR-MFDP-197187-GO-RFB / 2: Stabilizing and Procurement of 90 desktops, Strengthening Performance of Single Stage - One IDA / D5060 Post Request for Bids Open - National 150,000.00 0.00 Canceled 2021-01-08 2021-01-13 2021-02-24 2021-03-26 2021-04-30 2021-10-27 and 90 printers for IFMIS Financial Controls and Envelope rollout to 20 sites Systems LR-MFDP-235374-GO-RFQ / Pending Procurement of 10 laptops, 2 1: Enhancing DRM Sources Request for Single Stage - One IDA / D5060 Post Limited 20,000.00 0.00 Implementati 2021-06-15 2021-08-10 2021-11-08 printers and 1 projector with and Systems Quotations Envelope on screen LR-MFDP-235389-GO-RFQ / Pending 1: Enhancing DRM Sources Request for Single Stage - One Procurement of office IDA / D5060 Post Limited 100,000.00 0.00 Implementati 2021-06-15 2021-08-10 2021-11-08 and Systems Quotations Envelope furniture and fixture on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 2: Stabilizing and LR-MFDP-97553-NC-RFQ / Strengthening Performance of Request for Single Stage - One IDA / V1080 Post Limited 99,000.00 99,500.00 Completed 2018-01-09 2018-01-04 2018-03-06 2018-02-28 2019-02-28 2019-02-28 SLA for Wimax Financial Controls and Quotations Envelope Systems 2: Stabilizing and LR-MFDP-97594-NC-DIR / Strengthening Performance of IDA / V1080 Post Direct Selection Direct 52,998.00 28,800.00 Completed 2017-12-15 2017-12-15 2017-12-20 2017-12-18 2018-01-24 2017-12-28 2018-12-26 2018-12-26 SLA for Battery Bank Financial Controls and Systems 2: Stabilizing and LR-MFDP-97441-NC-RFQ / Strengthening Performance of Request for Single Stage - One SLA for Data Center IDA / V1080 Post Limited 52,998.00 98,658.67 Completed 2018-04-01 2018-03-08 2018-05-27 2018-07-30 2019-02-28 2019-01-31 Financial Controls and Quotations Envelope Maintenance Systems 2: Stabilizing and LR-MFDP-135160-NC-DIR / Strengthening Performance of SLA for IFMIS Infrastructure IDA / D5060 Post Direct Selection Direct 100,000.00 0.00 Canceled 2019-09-20 2019-06-17 2019-09-25 2019-09-04 2019-10-30 2020-09-30 Financial Controls and Support and Maintenance Systems 2: Stabilizing and LR-MFDP-135377-NC-DIR / Strengthening Performance of Redeployment of Electronic IDA / V1080 Post Direct Selection Direct 98,000.00 0.00 Canceled 2019-07-13 2019-07-15 2019-07-18 2019-08-16 2019-08-22 2019-12-16 Financial Controls and Data Management System Systems 2: Stabilizing and LR-MFDP-135395-NC-DIR / Strengthening Performance of IDA / V1080 Prior Direct Selection Direct 352,406.00 0.00 Canceled 2019-06-27 2019-10-14 2019-07-02 2019-10-14 2019-08-06 2019-10-31 Activation of Budget Module Financial Controls and Systems LR-MFDP-145529-NC-DIR / 2: Stabilizing and Pending Activation of key Strengthening Performance of IDA / D5060 Post Direct Selection Direct 250,000.00 0.00 Implementati 2019-12-12 2019-12-17 2020-01-21 2020-07-19 functionalities by FreeBalance Financial Controls and on for IFMIS improvement Systems LR-MFDP-145292-NC-DIR / 2: Stabilizing and SLA for IFMIS Infrastructure Strengthening Performance of IDA / D5060 Post Direct Selection Direct 86,000.00 86,000.00 Signed 2019-10-02 2019-10-02 2019-10-07 2019-10-04 2019-11-11 2019-10-15 2020-11-10 Support and Maintenance Financial Controls and Services Systems Page 2 LR-MFDP-151076-NC-DIR / 2: Stabilizing and Enhancement of the Electronic Strengthening Performance of IDA / D5060 Post Direct Selection Direct 98,000.00 98,000.00 Completed 2019-07-15 2019-07-15 2019-07-20 2019-08-15 2019-08-24 2019-09-13 2020-02-20 2020-05-29 Document Management Financial Controls and System Systems LR-MFDP-145269-NC-RFB / 2: Stabilizing and Implement the EFT system Strengthening Performance of Single Stage - One IDA / D5060 Post Request for Bids Open - International 300,000.00 0.00 Canceled 2020-01-13 2020-01-18 2020-02-29 2020-03-30 2020-05-04 2020-10-31 within the MFDP to automatic Financial Controls and Envelope GoL recurrent payment Systems LR-MFDP-196968-NC-RFQ / 2: Stabilizing and SLA for Support and Strengthening Performance of Request for Single Stage - One IDA / D5060 Post Limited 50,000.00 0.00 Canceled 2021-01-10 2021-03-07 2022-03-07 Maintenance of IFMIS Financial Controls and Quotations Envelope hardward environment Systems 2: Stabilizing and LR-MFDP-145263-NC-RFQ / Strengthening Performance of Request for Single Stage - One Deployment of LAN to 20 IDA / D5060 Post Limited 100,000.00 0.00 Canceled 2019-12-01 2020-01-26 2020-07-24 Financial Controls and Quotations Envelope IFMIS rollout sites Systems CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MFDP-81212-CS-CQS / 4: Improving Upstream and Consultant Consultant to Develop the M & IDA / V1080 Downstream PFM Systems in Post Qualification Open - National 39,600.00 0.00 Canceled 2018-11-08 2018-11-29 2019-01-12 2019-02-11 2019-03-18 2019-09-14 E Results Framework for PFM Selected Sectors Selection Strategy 2: Stabilizing and LR-MFDP-81208-CS-CQS / Consultant Strengthening Performance of Consultant to Develop Open IDA / V1080 Post Qualification Open - National 25,000.00 0.00 Canceled 2018-11-06 2018-11-27 2019-01-10 2019-02-09 2019-03-16 2019-09-12 Financial Controls and Budget National Action Plan Selection Systems LR-MFDP-81211-CS-LCS / Least Cost IDA / V1080 5: Project Management Post Open - National 20,000.00 0.00 Canceled 2018-11-12 2018-12-03 2019-01-16 2019-02-13 2019-03-15 2019-04-19 2019-05-24 2019-11-20 Firm to Conduct Audit of PPA Selection LR-MFDP-135794-CS-CQS / Consultant Consultancy for Independent IDA / D5060 5: Project Management Post Qualification Open - National 25,000.00 0.00 Canceled 2019-10-06 2019-10-02 2019-10-27 2019-12-10 2020-01-09 2020-02-13 2021-02-12 Verification Selection LR-MFDP-152805-CS-CQS / Consultant to facilitate Consultant 1: Enhancing DRM Sources technical workshop for IDA / D5060 Post Qualification Open - International 75,000.00 0.00 Canceled 2020-01-15 2019-12-19 2020-02-05 2020-01-09 2020-03-20 2020-03-05 2020-04-19 2020-05-24 2020-11-20 and Systems validation of VAT White Paper, Selection law and Migration Paper LR-MFDP-196923-CS-CQS / 2: Stabilizing and Consultancy for design, Consultant Strengthening Performance of Under installation, configuration and IDA / D5060 Post Qualification Open - National 185,000.00 0.00 2021-02-24 2021-02-24 2021-03-17 2021-03-12 2021-04-30 2021-05-30 2021-07-04 2021-12-31 Financial Controls and Implementation integration of the Local Area Selection Systems Network LR-MFDP-196918-CS-CQS / 2: Stabilizing and Consultant Consultancy to design, Strengthening Performance of Pending IDA / D5060 Post Qualification Open - International 300,000.00 0.00 2021-02-16 2021-03-09 2021-04-22 2021-05-22 2021-06-26 2021-12-23 develop and install GoL Data Financial Controls and Implementation Selection Portal at MFDP Systems LR-MFDP-212901-CS-CQS / Consulting Services for the Consultant 1: Enhancing DRM Sources Finalization and Validation of IDA / D5060 Post Qualification Open - International 100,000.00 0.00 Under Review 2019-12-19 2019-12-19 2020-01-09 2020-02-22 2020-03-23 2020-04-27 2020-10-24 and Systems the VAT Implementation Selection Package LR-MFDP-222825-CS-QBS / 2: Stabilizing and Consultancy to Provide PFM Strengthening Performance of Quality Based Under System Help Desk IDA / D5060 Prior Open - International 300,000.00 0.00 2021-04-02 2021-04-06 2021-04-23 2021-04-27 2021-06-06 2021-07-04 2021-08-03 2021-09-02 2021-10-07 2022-04-05 Financial Controls and Selection Implementation Management Solution for Systems MFDP LR-MFDP-197161-CS-CQS / 2: Stabilizing and Consultant Consultancy to conduct an Strengthening Performance of IDA / D5060 Post Qualification Open - National 100,000.00 0.00 Canceled 2021-01-18 2021-02-08 2021-03-24 2021-04-23 2021-05-28 2021-11-24 assessment of the additional Financial Controls and Selection 57 IFMIS rollout sites Systems INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual LR-MFDP-97537-CS-INDV / 1: Enhancing DRM Sources IDA / V1080 Post Consultant Open 176,850.00 216,000.00 Completed 2017-11-13 2017-10-05 2018-01-01 2018-02-14 2018-01-22 2018-02-22 2018-02-26 2018-04-30 2019-02-28 2019-02-28 Consultant for ITAS Advisor and Systems Selection LR-MFDP-97573-CS-INDV / Individual 1: Enhancing DRM Sources Consultant for Domestic IDA / V1080 Post Consultant Open 45,000.00 145,000.00 Completed 2017-12-06 2017-12-06 2018-01-24 2018-02-14 2018-02-14 2018-02-16 2018-03-21 2018-03-01 2019-01-31 2019-01-31 and Systems Resource Mobilization Selection LR-MFDP-97591-CS-INDV / Individual 1: Enhancing DRM Sources Senior Data Base IDA / V1080 Post Consultant Open 132,000.00 148,000.00 Completed 2017-12-06 2017-12-12 2018-01-24 2018-04-27 2018-02-14 2018-04-30 2018-03-21 2018-07-02 2019-02-28 2019-02-28 and Systems Administrator Selection LR-MFDP-97569-CS-INDV / Individual 1: Enhancing DRM Sources Consultant for Local ITAS IDA / V1080 Post Consultant Open 72,000.00 44,444.48 Completed 2017-12-06 2017-12-06 2018-01-24 2018-03-28 2018-02-14 2018-07-05 2018-03-21 2018-06-05 2019-02-28 2019-02-28 and Systems Advisor Selection LR-MFDP-97533-CS-INDV / Individual Consultant to Conduct 1: Enhancing DRM Sources IDA / V1080 Post Consultant Open 150,000.00 20,365.00 Completed 2018-01-29 2018-01-29 2018-03-19 2018-07-17 2018-04-09 2018-07-30 2018-05-14 2018-08-02 2019-02-28 2018-12-20 Business Process and Systems Selection Reengineering Page 3 LR-MFDP-97539-CS-INDV / Consultant to Undertake PFM 3: Improving Public-Sector Individual and Procurement Capacity IDA / V1080 Capacity for Enhanced Post Consultant Open 190,000.00 600.92 Completed 2018-04-23 2018-04-23 2018-06-11 2018-06-22 2018-07-02 2018-08-06 2018-08-06 2018-08-08 2018-11-30 2019-02-28 Needs Assessment and Oversight and Accountability Selection Develop LR-MFDP-97567-CS-CDS / International Procurement IDA / V1080 5: Project Management Post Direct Selection Direct 67,600.00 67,600.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2018-12-31 2018-12-31 Specialist 2: Stabilizing and LR-MFDP-97582-CS-CDS / Strengthening Performance of IDA / V1080 Post Direct Selection Direct 30,000.00 30,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Data Center Manager Financial Controls and Systems LR-MFDP-97563-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 18,000.00 24,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-01 2019-02-28 2019-02-28 M and E Officer LR-MFDP-97546-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 15,000.00 15,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Change Management Officer LR-MFDP-97595-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 12,000.00 16,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2019-02-28 2019-02-28 Administration Officer 2: Stabilizing and LR-MFDP-97574-CS-CDS / Strengthening Performance of IDA / V1080 Post Direct Selection Direct 24,000.00 32,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2019-02-28 2019-02-28 Data Base Administrator 1 Financial Controls and Systems 2: Stabilizing and LR-MFDP-97572-CS-CDS / Strengthening Performance of IDA / V1080 Post Direct Selection Direct 24,000.00 32,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2019-02-28 2019-02-28 Data Base Administrator 2 Financial Controls and Systems LR-MFDP-97577-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 18,000.00 18,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Coordinator NSA LR-MFDP-97585-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 9,000.00 12,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Grant Finance Officer LR-MFDP-97566-CS-CDS / Senior Assitant Internal IDA / V1080 5: Project Management Post Direct Selection Direct 19,500.00 119.82 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-07-30 2019-02-28 2019-02-28 Auditor LR-MFDP-97442-CS-CDS / IDA / V1080 5: Project Management Post Direct Selection Direct 12,000.00 0.00 Canceled 2018-07-02 2018-07-12 2018-09-15 2018-12-30 Assistant Internal Auditor 3: Improving Public-Sector LR-MFDP-97535-CS-CDS / IDA / V1080 Capacity for Enhanced Post Direct Selection Direct 15,939.00 15,939.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2018-12-31 2018-12-31 Registrar for FMTP and IPTP Oversight and Accountability 3: Improving Public-Sector LR-MFDP-97543-CS-CDS / IDA / V1080 Capacity for Enhanced Post Direct Selection Direct 31,200.00 31,200.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Director for FMTP and IPTP Oversight and Accountability LR-MFDP-97538-CS-CDS / 3: Improving Public-Sector Resident Coordinator for IDA / V1080 Capacity for Enhanced Post Direct Selection Direct 25,800.00 33,800.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 FMTP and IPTP Oversight and Accountability LR-MFDP-97536-CS-CDS / 3: Improving Public-Sector National Team Leader for IDA / V1080 Capacity for Enhanced Post Direct Selection Direct 25,200.00 25,200.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2018-12-31 2018-12-31 FMTP and IPTP Oversight and Accountability LR-MFDP-97575-CS-CDS / Senior Assistant Project IDA / V1080 5: Project Management Post Direct Selection Direct 12,000.00 16,000.00 Completed 2018-07-02 2018-06-28 2018-07-12 2018-07-23 2018-09-15 2018-08-02 2019-02-28 2019-02-28 Accountant 2: Stabilizing and LR-MFDP-97596-CS-CDS / Strengthening Performance of PSM for various FreeBalance IDA / V1080 Post Direct Selection Direct 143,954.00 143,954.00 Completed 2017-07-28 2018-06-20 2017-08-07 2017-11-27 2017-10-11 2018-09-19 2018-07-02 2018-07-31 Financial Controls and Applications Modules Systems Individual LR-MFDP-135157-CS-INDV / IDA / V1080 5: Project Management Post Consultant Open 144,000.00 0.00 Canceled 2019-10-10 2019-09-23 2019-11-28 2019-12-09 2019-12-19 2020-01-23 2020-07-21 International IFMIS Advisor Selection LR-MFDP-135156-CS-INDV / Individual International Procurement IDA / D5060 5: Project Management Prior Consultant Open 144,000.00 39,250.00 Signed 2019-10-10 2019-10-02 2019-11-28 2019-12-17 2019-12-19 2020-01-27 2020-01-23 2020-01-28 2020-12-31 Advisor Selection LR-MFDP-135410-CS-INDV / 4: Improving Upstream and Individual Consultant to Develop IDA / D5060 Downstream PFM Systems in Prior Consultant Open 205,000.00 0.00 Canceled 2019-12-22 2020-02-09 2020-03-01 2020-04-05 2020-12-01 Electronic Personnel Action Selected Sectors Selection Notice LR-MFDP-135988-CS-INDV / 4: Improving Upstream and Individual Database Administrator for IDA / V1080 Downstream PFM Systems in Post Consultant Open 10,000.00 0.00 Canceled 2019-10-16 2019-10-18 2019-12-04 2019-12-25 2020-01-29 2020-07-27 PETS Selected Sectors Selection LR-MFDP-145141-CS-INDV / Consultant to conduct 2: Stabilizing and Individual detailed needs assessment for Strengthening Performance of IDA / D5060 Post Consultant Open 50,000.00 32,950.00 Completed 2019-12-12 2019-11-20 2020-01-30 2020-02-12 2020-02-20 2020-07-01 2020-03-26 2020-07-16 2020-09-22 2020-08-20 Technical and Functional Financial Controls and Selection System Requirements for Systems Open Data LR-MFDP-145145-CS-CDS / IDA / D5060 5: Project Management Post Direct Selection Direct 42,000.00 72,150.00 Signed 2019-11-12 2019-11-15 2019-11-22 2019-11-18 2020-01-26 2019-11-20 2021-01-25 M & E Officer for PMU LR-MFDP-145268-CS-CDS / Administration Officer for IDA / D5060 5: Project Management Post Direct Selection Direct 24,000.00 39,000.00 Signed 2019-11-12 2019-11-15 2019-11-22 2019-11-18 2020-01-26 2019-11-20 2021-01-25 PMU LR-MFDP-145266-CS-CDS / 3: Improving Public-Sector Coordinator for Non-State IDA / D5060 Capacity for Enhanced Post Direct Selection Direct 36,000.00 58,500.00 Signed 2019-11-12 2019-11-15 2019-11-22 2019-11-18 2020-01-26 2019-11-20 2021-01-25 Actors Secretariat Oversight and Accountability Page 4 LR-MFDP-145290-CS-INDV / 3: Improving Public-Sector Individual Institutional Support IDA / D5060 Capacity for Enhanced Post Consultant Open 36,000.00 36,000.00 Signed 2019-11-26 2019-11-11 2020-01-14 2020-01-30 2020-02-04 2020-03-11 2020-03-10 2020-03-12 2021-03-10 Consultant for UL Oversight and Accountability Selection LR-MFDP-145146-CS-CDS / 3: Improving Public-Sector Grants Finance Officer for Non- IDA / D5060 Capacity for Enhanced Post Direct Selection Direct 18,000.00 29,250.00 Signed 2019-11-19 2019-11-15 2019-11-29 2019-11-18 2020-02-02 2019-11-20 2021-02-01 State Actors Secretariat Oversight and Accountability LR-MFDP-145274-CS-INDV / Consultant to train members 3: Improving Public-Sector Individual of Parliament on the IDA / D5060 Capacity for Enhanced Post Consultant Limited 35,000.00 0.00 Canceled 2020-01-07 2020-01-12 2020-02-02 2020-03-08 2020-09-04 examination of statement of Oversight and Accountability Selection accountants of State Owned Enterprises 2: Stabilizing and LR-MFDP-150792-CS-CDS / Strengthening Performance of Activation of the IFMIS Budget IDA / D5060 Post Direct Selection Direct 380,000.00 306,440.00 Completed 2019-12-17 2019-07-12 2019-12-27 2019-07-22 2020-03-01 2019-07-16 2020-08-28 2020-12-30 Financial Controls and Module Systems 2: Stabilizing and LR-MFDP-145304-CS-CDS / Strengthening Performance of IDA / D5060 Post Direct Selection Direct 48,000.00 50,000.00 Signed 2019-11-19 2019-12-20 2019-11-29 2019-11-19 2020-02-02 2019-11-22 2021-02-01 Database Administrator 2 Financial Controls and Systems 2: Stabilizing and LR-MFDP-145302-CS-CDS / Strengthening Performance of IDA / D5060 Post Direct Selection Direct 48,000.00 50,000.00 Signed 2019-11-19 2019-11-20 2019-11-29 2019-11-19 2020-02-02 2019-11-22 2021-02-01 Database Administrator 1 Financial Controls and Systems LR-MFDP-145284-CS-CDS / 2: Stabilizing and Consultant to update and Strengthening Performance of IDA / D5060 Post Direct Selection Direct 100,000.00 120,000.00 Completed 2019-11-18 2019-10-28 2019-11-28 2019-11-18 2020-02-01 2020-01-16 2020-07-30 2020-03-10 revamp the 5 - Year IFMIS Financial Controls and Strategy Systems LR-MFDP-145526-CS-INDV / Consultant to conduct 2: Stabilizing and Individual institutional needs Strengthening Performance of IDA / D5060 Post Consultant Open 75,000.00 50,550.00 Signed 2020-02-17 2020-11-01 2020-04-06 2021-01-07 2020-04-27 2021-02-04 2020-06-01 2021-02-10 2020-11-28 assessment and develop Financial Controls and Selection capacity building plan for Systems MTEF Implementation LR-MFDP-150791-CS-CDS / 4: Improving Upstream and Develop, configure, integrate IDA / D5060 Downstream PFM Systems in Prior Direct Selection Direct 300,000.00 246,086.20 Completed 2020-01-06 2020-02-25 2020-01-16 2020-03-13 2020-03-21 2020-09-18 2020-09-17 2021-02-04 and deploy e-PAN Application Selected Sectors LR-MFDP-145278-CS-INDV / Consultant to facilitate Individual 1: Enhancing DRM Sources technical workshop for IDA / D5060 Post Consultant Open 25,000.00 0.00 Canceled 2020-02-12 2020-04-01 2020-04-22 2020-05-27 2020-11-23 and Systems Validation of VAT White Paper, Selection Law, and Migration Paper LR-MFDP-152800-CS-CDS / 4: Improving Upstream and Consultancy for Independent IDA / D5060 Downstream PFM Systems in Prior Direct Selection Direct 100,000.00 15,000.00 Completed 2020-01-15 2020-01-29 2020-01-25 2020-01-31 2020-03-30 2020-03-02 2020-09-26 2020-12-30 Verification Selected Sectors LR-MFDP-152801-CS-CDS / 2: Stabilizing and Consultancy to implement the Strengthening Performance of EFT System within the MFDP IDA / D5060 Prior Direct Selection Direct 300,000.00 654,059.82 Signed 2020-01-15 2020-02-25 2020-01-25 2020-02-12 2020-03-30 2020-08-19 2020-09-26 Financial Controls and to Automatic GoL Recurrent Systems Payment LR-MFDP-157299-CS-INDV / 4: Improving Upstream and Individual Database Administrator for IDA / D5060 Downstream PFM Systems in Post Consultant Limited 10,000.00 9,900.00 Signed 2020-02-12 2020-01-10 2020-02-17 2020-02-21 2020-03-09 2020-09-17 2020-04-13 2020-10-23 2020-10-10 PETS Selected Sectors Selection LR-MFDP-163491-CS-INDV / Individual 1: Enhancing DRM Sources Technical Focal Person for IDA / D5060 Post Consultant Open 48,000.00 54,000.00 Signed 2020-03-20 2020-03-25 2020-05-08 2020-07-02 2020-05-29 2020-08-25 2020-07-03 2020-08-31 2021-07-03 and Systems Revenue Selection LR-MFDP-163500-CS-INDV / Individual 1: Enhancing DRM Sources Technical Focal Person for IDA / D5060 Post Consultant Open 48,000.00 54,000.00 Signed 2020-03-20 2020-03-25 2020-05-08 2020-06-04 2020-05-29 2020-07-09 2020-07-03 2020-07-28 2021-07-03 and Systems Expenditure Selection 2: Stabilizing and Individual LR-MFDP-163487-CS-INDV / Strengthening Performance of IDA / D5060 Post Consultant Limited 180,000.00 197,633.33 Signed 2020-02-05 2020-02-13 2020-02-10 2020-02-19 2020-03-02 2020-09-03 2020-04-06 2020-10-20 2021-04-07 International IFMIS Advisor Financial Controls and Selection Systems LR-MFDP-163936-CS-INDV / 3: Improving Public-Sector Individual Consultant to Develop IDA / D5060 Capacity for Enhanced Post Consultant Open 75,000.00 35,000.00 Completed 2020-03-24 2020-03-10 2020-05-12 2020-06-01 2020-06-02 2020-07-10 2020-07-07 2020-07-17 2021-01-03 2020-08-20 Business/Strategic Plan for Oversight and Accountability Selection LICPA LR-MFDP-170136-CS-CDS / IDA / D5060 5: Project Management Post Direct Selection Direct 65,000.00 72,150.00 Signed 2020-03-03 2020-03-03 2020-03-13 2020-03-13 2020-05-17 2020-04-01 2021-05-17 Project Manager for PFMRISP LR-MFDP-175683-CS-CDS / 3: Improving Public-Sector Firm to configure and IDA / D5060 Capacity for Enhanced Post Direct Selection Direct 100,000.00 77,250.00 Signed 2020-04-02 2020-06-02 2020-04-12 2020-07-03 2020-06-16 2020-10-29 2020-12-13 enhance PENTANA Audit Oversight and Accountability Software LR-MFDP-179865-CS-CDS / Intwrnational Procurement IDA / D5060 5: Project Management Prior Direct Selection Direct 150,000.00 170,204.00 Signed 2020-06-10 2020-06-16 2020-06-20 2020-06-11 2020-08-24 2020-09-08 2021-08-24 Advisor 2: Stabilizing and LR-MFDP-135414-CS-INDV / Individual Strengthening Performance of Consultant to Provide Support IDA / D5060 Post Consultant Open 90,000.00 0.00 Canceled 2019-10-14 2019-10-18 2019-12-02 2020-01-14 2019-12-23 2020-02-26 2020-01-27 2020-07-31 Financial Controls and to GRPB Unit Selection Systems LR-MFDP-145520-CS-INDV / Individual Consultant to draft excise 1: Enhancing DRM Sources IDA / D5060 Post Consultant Open 10,000.00 0.00 Canceled 2020-02-12 2020-04-01 2020-04-22 2020-05-27 2020-11-23 stamp tax implementation and Systems Selection manual LR-MFDP-196970-CS-INDV / Individual Consultant to review and 1: Enhancing DRM Sources Pending IDA / D5060 Post Consultant Open 100,000.00 0.00 2021-02-23 2021-04-13 2021-05-04 2021-06-08 2021-12-05 redraft provision of the tax and Systems Implementation Selection code Page 5 LR-MFDP-196974-CS-INDV / 2: Stabilizing and Consultant to develop. Individual Strengthening Performance of Under Validate, and produce training IDA / D5060 Post Consultant Open 35,000.00 0.00 2021-03-10 2021-02-07 2021-04-28 2021-05-19 2021-06-23 2021-12-20 Financial Controls and Implementation manual of the IFMIS Budget Selection Systems Module LR-MFDP-197171-CS-INDV / 2: Stabilizing and Individual Consultant to update the Strengthening Performance of IDA / D5060 Post Consultant Open 50,000.00 0.00 Under Review 2021-03-11 2021-01-27 2021-04-29 2021-05-20 2021-06-24 2021-12-21 MTEF Manual and provide Financial Controls and Selection training Systems LR-MFDP-196990-CS-INDV / 2: Stabilizing and Consultant to build the Individual Strengthening Performance of Under capacity of the Gender IDA / D5060 Post Consultant Limited 90,000.00 0.00 2020-12-16 2020-09-24 2020-12-21 2021-01-11 2021-02-15 2021-08-14 Financial Controls and Implementation Responsive and Planning Selection Systems Budgeting (GRPB) Unit LR-MFDP-196916-CS-INDV / Consultant to develop an 3: Improving Public-Sector Individual Under implementation & operation IDA / D5060 Capacity for Enhanced Post Consultant Open 55,000.00 0.00 2021-02-22 2021-02-01 2021-04-12 2021-05-03 2021-06-07 2021-12-04 Implementation manual for PFM Reform Oversight and Accountability Selection Coordination Unit LR-MFDP-196939-CS-INDV / 3: Improving Public-Sector Individual Consultant to revise PFM Under IDA / D5060 Capacity for Enhanced Post Consultant Open 45,000.00 0.00 2021-03-18 2021-03-08 2021-05-06 2021-05-27 2021-07-01 2021-12-28 Regulations for Government Implementation Oversight and Accountability Selection of Liberia LR-MFDP-197166-CS-INDV / Capacity Building & Change Individual Under Management Specialist to IDA / D5060 5: Project Management Post Consultant Open 42,000.00 0.00 2021-02-09 2020-11-04 2021-03-30 2021-04-20 2021-05-25 2022-05-25 Implementation support the PFM Capacity Selection Building Strategy LR-MFDP-196934-CS-INDV / Economic Governance Individual Specialist to provide advisory IDA / D5060 5: Project Management Post Consultant Open 60,000.00 80,004.00 Signed 2020-12-12 2020-10-29 2021-01-30 2021-01-05 2021-02-20 2021-01-26 2021-03-27 2021-01-29 2022-03-27 services to the Minister of Selection Finance LR-MFDP-197179-CS-CDS / 2: Stabilizing and Consultancy for migration of Strengthening Performance of GoL harmonized payroll data IDA / D5060 Post Direct Selection Direct 175,000.00 168,976.40 Signed 2020-08-12 2020-08-26 2020-08-22 2020-08-28 2020-10-26 2020-12-18 2021-04-24 Financial Controls and to Civil Service Management Systems System 2: Stabilizing and LR-MFDP-196996-CS-CDS / Strengthening Performance of Under Consultancy for Migration of IDA / D5060 Post Direct Selection Direct 250,000.00 0.00 2021-03-05 2020-11-10 2021-03-15 2021-05-19 2021-11-15 Financial Controls and Implementation Donor Financed Projects Systems LR-MFDP-201277-CS-CDS / 2: Stabilizing and Consultant to Conduct Gap Strengthening Performance of IDA / D5060 Post Direct Selection Direct 28,000.00 29,655.00 Signed 2020-09-01 2020-10-01 2020-09-11 2020-10-19 2020-11-15 2020-10-23 2021-02-13 Analysis of the Ntional Data Financial Controls and Ware House Systems LR-MFDP-201265-CS-CDS / 3: Improving Public-Sector Consultant to Develop IDA / D5060 Capacity for Enhanced Post Direct Selection Direct 29,655.00 28,000.00 Completed 2020-09-01 2020-10-01 2020-09-11 2020-10-19 2020-11-15 2020-10-23 2021-02-13 2020-12-30 Business Plan, Strategic Plan Oversight and Accountability and Road Map for LICPA LR-MFDP-201983-CS-CDS / 4: Improving Upstream and GAC to Conduct Audit of the Under IDA / D5060 Downstream PFM Systems in Post Direct Selection Direct 20,000.00 0.00 2020-11-16 2020-11-09 2020-11-26 2021-01-30 2021-07-29 Government Harmonized Implementation Selected Sectors Payroll Data LR-MFDP-202587-CS-INDV / Consultant to Conduct Individual 1: Enhancing DRM Sources Under Baseline Review of the Liberia IDA / D5060 Post Consultant Open 75,000.00 0.00 2020-11-18 2020-11-09 2021-01-06 2021-01-27 2021-03-03 2021-08-30 and Systems Implementation Revenue Code as Amended in Selection 2019 LR-MFDP-135409-CS-INDV / 3: Improving Public-Sector Individual Senior Financial Management IDA / V1080 Capacity for Enhanced Post Consultant Open 48,000.00 0.00 Canceled 2019-10-14 2019-10-02 2019-12-02 2020-01-09 2019-12-23 2020-01-27 2021-01-26 Officer Oversight and Accountability Selection LR-MFDP-196975-CS-CDS / 2: Stabilizing and Consultancy to rollout the Strengthening Performance of Civil Service Management IDA / D5060 Post Direct Selection Direct 75,000.00 0.00 Canceled 2021-01-08 2021-01-18 2021-03-24 2021-09-20 Financial Controls and System (CSM) to Internal Systems Audit Agency 2: Stabilizing and LR-MFDP-196978-CS-INDV / Individual Strengthening Performance of Consultant to develop and IDA / D5060 Post Consultant Open 25,000.00 0.00 Canceled 2021-03-04 2021-04-22 2021-05-13 2021-06-17 2021-12-14 Financial Controls and establish risk register in MACs Selection Systems LR-MFDP-196997-CS-INDV / 2: Stabilizing and Individual Consultan to develop content Strengthening Performance of IDA / D5060 Post Consultant Open 50,000.00 0.00 Canceled 2021-02-19 2021-04-09 2021-04-30 2021-06-04 2021-12-01 specific for IFMIS training Financial Controls and Selection strategy for GoL Systems LR-MFDP-197163-CS-INDV / 2: Stabilizing and Consultant to conduct training Individual Strengthening Performance of needs analysis and develop a IDA / D5060 Post Consultant Open 50,000.00 0.00 Canceled 2021-03-21 2021-05-09 2021-05-30 2021-07-04 2021-12-31 Financial Controls and annual training program for Selection Systems IFMIS end users and ICT staff LR-MFDP-201275-CS-INDV / Individual Consultant to Review, Finalize, 1: Enhancing DRM Sources IDA / D5060 Post Consultant Open 75,000.00 0.00 Canceled 2020-11-02 2020-11-09 2020-12-21 2021-01-11 2021-02-15 2021-08-14 and validate existing VAT and Systems Selection Implementation Document LR-MFDP-236434-CS-CDS / 2: Stabilizing and Consultancy for IFMIS Dark Strengthening Performance of Under Fiber Connectivity Network IDA / D5060 Post Direct Selection Direct 175,000.00 0.00 2021-06-08 2021-06-10 2021-06-18 2021-08-22 2022-08-23 Financial Controls and Implementation and Data Center Co-location Systems Services Page 6 LR-MFDP-236435-CS-CDS / Consultant to Develop 2: Stabilizing and Application Programming Strengthening Performance of IDA / D5060 Post Direct Selection Direct 150,000.00 0.00 Under Review 2021-06-10 2021-06-10 2021-06-20 2021-08-24 2022-02-20 interface between IFMIS, Financial Controls and Revenue System, and the EFT Systems System Page 7 PROCUREMENT PLAN (Textual Part) Project information: [Haiti] [P163490 - Haiti Rural Accessibility & Resilience Project Project Implementation agency: [UCE] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. • PROCUREMENT Haiti : Haiti Rural Accessibility & Resilience Project PLAN General Information Country: Haiti Bank’s Approval Date of the Original Procurement Plan: 2019-02-27 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163490 GPN Date: Project Name: Haiti Rural Accessibility & Resilience Project Loan / Credit No: IDA / D3230, IDA / D6690 Unité Centrale d'Exécution Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AON-001-PARR/2019 / Travaux de Traitement de Improving Resilience of Points critiques dans les Single Stage - One 2019-12- IDA / D3230 Transport Connecting Prior Request for Bids Open - National 0.00 Canceled 2019-02-21 2019-03-01 2019-04-10 2019-05-02 2019-05-26 Départements du Sud, des Envelope 06 Infrastructure Nippes et de l'Ouest en quatre (4) Lots DC-001-PARR/2019 / Protection du Pont de Trou du Improving Resilience of Request for Single Stage - One 2020-05- Nord dans la Commune du IDA / D3230 Transport Connecting Post Limited 441,342.20 Signed 2019-02-28 2019-11-11 2019-05-05 2020-01-20 Quotations Envelope 01 même nom dans le Infrastructure Département du Nord'est DC-002-PARR/2019 / Protection de la Route Vieux Improving Resilience of Request for Single Stage - One 2020-03- Bourg d'Aquin - L'Asile dans IDA / D3230 Transport Connecting Post Limited 0.00 Canceled 2019-08-24 2019-10-20 Quotations Envelope 28 la localité de Kapol dans les Infrastructure Nippes DC-005-PARR/2019 / Protection et Réhabilitation de Improving Resilience of Deux (2) Ponts dans les Request for Single Stage - One 2020-03- IDA / D3230 Transport Connecting Post Limited 543,462.50 Signed 2019-08-26 2019-11-11 2019-10-22 2020-01-20 Communes de Grand-Goâve Quotations Envelope 30 Infrastructure et de Petit-Goâve (Département de l'Ouest) en deux (2) Lots AON-001-PARR/2020 / Protection de la RD22 Improving Resilience of Single Stage - One 2020-07- (Tronçon Miragoane - Petite IDA / D3230 Transport Connecting Post Request for Bids Open - National 751,145.00 Signed 2019-10-14 2020-06-02 2019-10-19 2019-11-30 2020-08-07 2019-12-30 2020-09-28 2020-02-03 2020-11-11 Envelope 12 Rivière de Nippes) en deux Infrastructure lots DC-003-PARR/2019 / Improving Resilience of Request for Single Stage - One 2020-06- Protection du Pont de Port-a- IDA / D3230 Transport Connecting Post Limited 744,248.50 Signed 2019-11-27 2019-12-17 2020-01-06 2020-04-27 Quotations Envelope 14 Piment Infrastructure DC-004-PARR/2019 / Improving Resilience of Request for Single Stage - One 2020-08- Protection de trois (3) Ponts IDA / D3230 Transport Connecting Post Limited 534,415.50 Signed 2019-12-18 2019-12-17 2020-02-12 2020-04-27 Quotations Envelope 10 sur la RN2 Infrastructure AON-002-PARR/2020 / Traitement des points Under Single Stage - One 2021-06- critiques sur le tronçon La IDA / D3230 Enhancing Rural Connectivity Post Request for Bids Open - National 0.00 Implementat 2020-10-06 2020-10-06 2020-10-08 2020-11-19 2020-11-25 2020-12-04 2021-01-29 2020-12-28 Envelope 06 Colline - Fond-des-Blancs en ion sept (7) lots AOI-001-PARR/2021 / Travaux de traitement des Single Stage - One Under 2021-08- points critiques sur le tronçon IDA / D6690 Enhancing Rural Connectivity Prior Request for Bids Open - International 0.00 2020-12-21 2020-12-26 2021-02-06 2021-02-21 2021-03-17 Envelope Review 24 de route Dessalines - Saint- Michel en cinq (5) lots AON-003-PARR/2021 / Traitement des points Under Single Stage - One 2021-08- critiques: Tronçon de Route IDA / D3230 Enhancing Rural Connectivity Post Request for Bids Open - National 0.00 Implementat 2020-12-16 2020-12-28 2020-12-21 2021-02-01 2021-02-12 2021-02-16 2021-03-26 2021-03-12 Envelope 19 Petit Trou - Baradères en ion quatre (4) lots AON-004-PARR/2020 / TRAITEMENT DE POINTS CRITIQUES SUR LE TRONÇON Under THIOTTE -- ANSE-À-PITRES Single Stage - One 2021-10- IDA / D3230 Enhancing Rural Connectivity Post Request for Bids Open - National 0.00 Implementat 2021-01-18 2021-01-22 2021-01-23 2021-03-06 2021-03-27 2021-04-25 Lot 1: Thiotte - Boucan Envelope 02 ion Guillaume Lot 2: Boucan Guillaume - Anse-à-Pitres DP-002-PARR/2021 / RECONSTRUCTION Under D’OUVRAGES ENDOMMAGÉS Request for Single Stage - One 2021-10- IDA / D3230 Enhancing Rural Connectivity Post Limited 0.00 Implementat 2021-03-06 2021-03-01 2021-05-10 PAR LE CYCLONE LAURA DANS Quotations Envelope 17 ion LE SUD-EST EN QUATRE (4) LOTS AON-005-PARR/2021 / Under Protection et Réhabilitation de Single Stage - One 2021-11- IDA / D3230 Enhancing Rural Connectivity Post Request for Bids Open - National 0.00 Implementat 2021-03-18 2021-04-05 2021-03-23 2021-05-04 2021-05-25 2021-06-23 quatre (4) Ponts sur la RN2 et Envelope 30 ion la RD25 AON-006-PARR/2021 / Construction et Protection de Under Single Stage - One 2021-12- quatre (4) Dalots dans les IDA / D3230 Enhancing Rural Connectivity Post Request for Bids Open - National 0.00 Implementat 2021-03-25 2021-05-11 2021-03-30 2021-05-11 2021-06-01 2021-06-30 Envelope 07 Départements de l'Artibonite ion et du Sud AOI-001-UCE-2018-PBCA / Travaux de construction de quatre ponts dans les départements du Centre, du Single Stage - One 13,963,070. 2020-09- Nord et de l'Artibonite (Ponts IDA / D6690 Enhancing Rural Connectivity Prior Request for Bids Open - International Signed 2017-11-14 2021-04-13 2018-06-18 2018-08-24 2018-08-24 2018-12-19 2021-04-13 2019-03-28 2019-03-28 Envelope 47 18 sur les rivières Bonbon, Rio Frio, Wallondry et l'Attalaye) Lot 1 - Rio Frio, Bonbon Lot 2 - Wallondry, L'Attalaye Page 1 DC-001-BCA/2019 / Request for Traitement des Points Quotations - Pending critiques dans les Communes Request for Single Stage - One Small Works 2020-08- IDA / D6690 Enhancing Rural Connectivity Post Limited 0.00 Implementat 2019-12-18 2020-02-12 de Saint-Michel de l'Attalaye Quotations Envelope (Emergency) 10 ion et de Saint Raphaël en deux SPD - (2) lots Competitive Request for DC-003-BCA/2019 / Quotations - Pending CONSTRUCTION D’UN DALOT Request for Single Stage - One Small Works 2020-10- IDA / D6690 Enhancing Rural Connectivity Post Limited 0.00 Implementat 2019-12-17 2020-04-27 4(3.5×4) SUR LA RIVIÈRE Quotations Envelope (Emergency) 04 ion BRETELLE SPD - Competitive DC002/BCA/2018 / Construction de trois dalots en trois Lots sur la Ravine Request for Sèche, la Rivière Yayou et la Pending Request for Single Stage - One Quotations 2019-05- Rivière Vébrine sur le tronçon IDA / D6690 Enhancing Rural Connectivity Post Limited 0.00 Implementat 2018-05-30 2018-11-16 Quotations Envelope (Non Bank- 15 de route Dessalines - St- ion SPD) Michel - Lot 1 A - Ravine Sèche, Lot 1 B - Riviere Yayou, Lot 1 C - Riviere Vebrine DC003/UCE/BCA/2018 / Travaux de traitement des Request for Pending points critiques sur le tronçon Request for Single Stage - One Quotations 2020-02- IDA / D6690 Enhancing Rural Connectivity Post Limited 0.00 Implementat 2018-09-24 2019-09-11 de route Titanyen - Saut- Quotations Envelope (Non Bank- 18 ion d'eau - Lot 1, Lot 2, Lot 3, SPD) Lot4, Lot 5 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending GO-001-PARR/2019 / Request for Single Stage - One IDA / D3230 Project Management Post Limited 0.00 Implementati 2019-03-09 2019-04-23 2019-06-22 Acquisition de vehicule Quotations Envelope on GO-002-PARR/2021 / Acquisition de 500 mini kits énergétiques solaires pour un Pending Promoting Sustainable Request for Single Stage - One échantillon de ménages IDA / D3230 Post Limited 0.00 Implementati 2021-05-08 2021-06-22 2021-12-19 Mobility Development Quotations Envelope devant participer à l'enquête on Origine-Destination au Cap- Haïtien ED-006-PARR/2021 / Acquisition de Téléphones Under portables pour la conduite Promoting Sustainable IDA / D3230 Post Direct Selection Direct 0.00 Implementati 2021-05-10 2021-05-11 2021-05-15 2021-06-19 2021-12-16 d'une enquête de mobilité Mobility Development on auprès de ménage au Cap- Haïtien NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ED-001-PARR/2019 / Services en vue de Collecte de Improving Resilience of Pending Données Vidéo Aérienne à IDA / D3230 Transport Connecting Post Direct Selection Direct 0.00 Implementati 2019-04-25 2019-04-26 2019-04-30 2019-06-04 l'aide de Drones au Cap- Infrastructure on Haïtien ED-003-BCA/2019 / RECRUTEMENT D'UNE ÉQUIPE Under LOCALE POUR EFFECTUER LA Promoting Sustainable IDA / D3230 Post Direct Selection Direct 0.00 Implementati 2019-07-09 2019-07-16 2019-07-14 2019-07-24 2019-08-05 COLLECTE DE DONNÉES À Mobility Development on L'AIDE DE L’APPLICATION COLLECTOR AU CAP-HAÏTIEN ED-004-PARR/2020 / Élaboration Plan de mobilité, exécution des travaux d'entretien et de réparation de Improving Resilience of routes rurales, et IDA / D3230 Transport Connecting Prior Direct Selection Direct 22,446,660.00 Signed 2019-10-28 2019-11-04 2019-10-31 2019-11-05 2019-11-13 2019-12-31 2022-03-31 renforcement des capacités Infrastructure communautaires dans les Départements du Sud-Est, des Nippes et du Sud ED-005-PARR/2020 / Services de Laboratoire en Appui à la Mission de Improving Resilience of Under Supervision des Travaux de IDA / D3230 Transport Connecting Post Direct Selection Direct 0.00 Implementati 2020-04-29 2020-04-10 2020-05-02 2020-05-13 2021-02-10 Construction des Ponts Rio Infrastructure on Frio, Bonbon, Walondry et L'Attalaye de la Boucle Centre- Artibonite MTPTC/UCE/PARR-20/INV- Pending 001 / Fourniture et Request for Single Stage - One IDA / D3230 Project Management Post Limited 0.00 Implementati 2021-03-21 2021-05-01 2021-10-08 implémentation d'un système Quotations Envelope on de comptabilité informatisée UN-001-PARR/2021 / Renforcement de la protection et la résilience des communautés des zones de déploiement des IDA / D3230 Enhancing Rural Connectivity Post Direct Selection Direct 1,019,789.00 Signed 2021-05-12 2021-05-11 2021-05-17 2021-05-17 2021-06-21 2021-05-28 2023-02-11 infrastructures routières dans le Grand Sud en matière de VBG, notamment les EAS et le HS CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Page 2 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DP-003-PARR/2019 / Improving Resilience of Consultant Réalisation d'une Etude de IDA / D3230 Transport Connecting Post Qualification Open - International 272,550.36 Signed 2019-02-25 2019-03-11 2019-04-15 2019-06-06 2019-04-29 2020-11-05 2019-05-24 2020-11-30 2019-11-24 vulnérabilité (Pilote) du Infrastructure Selection Réseau Routier en Haiti DP-001-PARR/2019 / Audit Least Cost IDA / D3230 Project Management Post Open - National 78,548.76 Signed 2019-02-22 2019-01-13 2019-02-23 2019-02-25 2019-03-08 2019-03-11 2019-03-25 2019-03-26 2019-04-26 2019-04-05 2019-04-29 2019-04-28 2019-08-01 2022-04-27 Financier du PARR Selection DP-004-PARR/2019 / Etudes Consultant de mise en place d'un système Under IDA / D3230 Project Management Post Qualification Open - International 0.00 2019-02-26 2019-03-19 2019-04-14 2019-04-19 2019-05-13 2019-11-13 d'Archivage électronique à Implementation Selection l'UCE DP-002-PARR/2019 / Recrutement d'une Firme ou d'un Opérateur pour Quality And Cost- Cartographie et Plans de IDA / D3230 Enhancing Rural Connectivity Prior Open - International 0.00 Canceled 2019-03-13 2019-03-27 2019-04-21 2019-06-02 2019-06-23 2019-07-10 2019-08-07 2020-02-07 Based Selection Mobilité en Zone Rurale dans les Départements du Sud, du Sud-est et des Nippes QC-001-PARR/2021 / Consultant Promoting Sustainable Under Enquête Origine-Destination IDA / D3230 Post Qualification Limited 0.00 2020-11-10 2020-11-23 2020-11-24 2020-12-07 2020-12-09 2020-12-20 2021-02-21 Mobility Development Implementation au Cap-Haïtien Selection DP-005-PARR/2021 / ÉTUDES ROUTIÈRES SUR 107 Quality And Cost- Under KM DE ROUTES SUR LE IDA / D3230 Enhancing Rural Connectivity Post Open - International 0.00 2021-02-01 2021-04-01 2021-02-22 2021-03-29 2021-04-26 2021-05-17 2021-06-10 2021-07-09 2022-01-05 Based Selection Implementation TRONÇON THIOTTE / MARIGOT DP-006-PARR/2021 / Assistance au Maitre d’Ouvrage dans le cadre de la Improving Resilience of Quality And Cost- reconstruction de quatre IDA / D3230 Transport Connecting Prior Open - International 0.00 Under Review 2021-03-22 2021-04-01 2021-04-12 2021-05-05 2021-05-26 2021-06-23 2021-07-23 2021-08-27 2021-10-01 2023-08-22 Based Selection ouvrages d’art dans les Infrastructure départements de l’Ouest, du Sud et des Nippes QC-002-PARR/2021 / ÉTUDE DE PRÉFAISABILITÉ POUR Consultant Promoting Sustainable Under AMÉLIORER LA MOBILITÉ SUR IDA / D3230 Post Qualification Limited 0.00 2021-04-23 2021-04-23 2021-05-07 2021-05-22 2021-06-03 2021-11-30 Mobility Development Implementation LES PRINCIPAUX CORRIDORS Selection DE PORT-AU-PRINCE DP001/UCE/BCA/2019 / Supervision des travaux de construction de quatre ponts dans les départements du Centre, du Nord et de Quality And Cost- Pending IDA / D6690 Enhancing Rural Connectivity Post Open - International 0.00 2018-08-21 2018-09-04 2019-04-01 2019-05-27 2019-07-05 2019-08-09 2019-10-31 2021-05-23 l'Artibonite (Ponts sur les Based Selection Implementation rivières Bonbon, Rio Frio, Wallondry et l'Attalaye) - Lot 1 - Rio Frio, Bonbon Lot 2 - Wallondry, l'Attalaye QC-001-CIAT-PARR/2020 / Réalisation d'une vidéo sur le Consultant Pending ruissellement de l'eau dans IDA / D6690 Enhancing Rural Connectivity Post Qualification Limited 0.00 2020-06-10 2020-06-24 2020-07-24 2020-08-28 2021-02-24 Implementation les bassins versants en zone Selection urbaine en Haïti INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDV-001-PARR/2019 / Individual Pending Responsable conformité et IDA / D3230 Project Management Post Consultant Open 0.00 2019-02-11 2019-03-14 2019-03-17 2019-04-01 2019-09-30 Implementation des aspects de S&E à l'UCE Selection INDV-003-PARR/2019 / Individual Under Spécialiste en Genre et en IDA / D3230 Project Management Post Consultant Open 0.00 2019-02-11 2019-03-13 2019-03-14 2019-03-17 2019-04-01 2019-09-30 Implementation Sauvegardes Sociales à l'UCE Selection INDV-004-PARR/2019 / Individual Under Assistant en Passation des IDA / D3230 Project Management Post Consultant Open 0.00 2019-02-11 2019-02-12 2019-03-14 2019-03-17 2019-04-01 2019-09-30 Implementation Marchés à l'UCE Selection Individual INDV-005-PARR/2019 / Under IDA / D3230 Project Management Post Consultant Open 0.00 2019-02-11 2019-02-14 2019-03-14 2019-03-17 2019-04-01 2019-09-30 Assistant Administratif à l'UCE Implementation Selection Individual INDV-006-PARR/2019 / Under IDA / D3230 Project Management Post Consultant Open 0.00 2019-02-11 2019-02-12 2019-03-14 2019-03-17 2019-04-01 2019-09-30 Comptable Sénior à l'UCE Implementation Selection Individual INDV-007-PARR/2019 / Under IDA / D3230 Project Management Post Consultant Open 0.00 2019-02-11 2019-02-14 2019-03-14 2019-03-17 2019-04-01 2019-09-30 Informaticien à l'UCE Implementation Selection Individual INDV-008-PARR/2019 / Pending IDA / D3230 Project Management Post Consultant Open 0.00 2019-02-11 2019-03-14 2019-03-17 2019-04-01 2019-09-30 Specialiste en Suivi-Evaluation Implementation Selection ED-002-PARR/2019 / Assistance technique pour le Pending renforcement de l’UCE dans la IDA / D3230 Project Management Post Direct Selection Direct 0.00 2019-06-20 2019-06-30 2019-07-25 2020-05-20 Implementation gestion des sauvegardes environnementales et sociales INDV-002-PARR/2019 / Individual Chargé de Projet du PARR à IDA / D3230 Project Management Post Consultant Open 0.00 Canceled 2019-02-11 2020-11-06 2019-03-14 2019-03-17 2019-04-01 2019-09-30 l'UCE Selection INDV-002-PARR/2021 / Individual Pending Chargé de Projet du PARR à IDA / D3230 Project Management Post Consultant Open 0.00 2020-11-06 2020-12-25 2021-01-15 2021-02-19 2022-02-19 Implementation l'UCE Selection Page 3 INDV-001-PARR/2021 / Individual Pending Spécialiste en Sauvegardes IDA / D3230 Project Management Post Consultant Open 0.00 2020-11-06 2020-12-25 2021-01-15 2021-02-19 2022-02-19 Implementation Environnementales Selection INDV-001-CIAT-PARR/2020 Individual / Recrutement d'un consultant Pending IDA / D6690 Project Management Post Consultant Limited 0.00 2020-06-10 2020-06-30 2020-07-29 2020-09-02 2021-01-30 Charge du monitoring et du Implementation Selection reporting INDV-009-PARR/2021 / Individual Supervision des Travaux de Pending IDA / D3230 Project Management Post Consultant Limited 0.00 2021-05-27 2021-05-27 2021-06-01 2021-06-09 2021-11-16 Points critiques: Colline Implementation Selection d'Aquin - Fonds des Blancs INDV-010-PARR/2021 / Individual Supervision des Travaux de Pending IDA / D3230 Project Management Post Consultant Limited 0.00 2021-05-27 2021-05-27 2021-06-01 2021-06-09 2021-11-16 Points critiques: Petit Trou de Implementation Selection Nippes - Baradères INDV-011-PARR/2021 / Individual Supervision des Travaux de Pending IDA / D3230 Project Management Post Consultant Limited 0.00 2021-05-27 2021-05-27 2021-06-01 2021-06-09 2021-11-16 Points critiques: Thiotte - Implementation Selection Anse-à-Pitres INDV-012-PARR/2021 / Individual Supervision des Travaux de Pending IDA / D3230 Project Management Post Consultant Limited 0.00 2021-05-27 2021-05-27 2021-06-01 2021-06-09 2021-11-16 Points critiques: Tikita et 3 Implementation Selection Dalots Jacmel-Marigot Page 4 PASO Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan 21 November 2016 2. Date of General Procurement Notice: 26 July 2011 3. Period covered by this procurement plan: October 2016 – June 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold Works (including turnkey, US$2,000,000 Contracts at or above the supply & installation of thresholds are subject to plant and equipment, and the Bank’s procurement PPP) prior review. Goods, information US$500,000 Contracts at or above the technology and non- thresholds are subject to consulting services the Bank’s procurement prior review. 2. Prequalification. Not applicable 3. Reference to (if any) Project Operational/Procurement Manual: PAIP Program Operations Manual V4, 16 December 2016. 4. Any Other Special Procurement Arrangements: not applicable 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ (yes/no) (Prior / Post) PASO Procurement of 400,000 Packages No Prior Procured for /SSS/ Goods on Direct together Cooks and P- Contracting basis with Niue - A06.1 - VSAT Supply of Vanuatu Direct Hardware (Phase contracting 2) PASO Procurement of Packages No Post Procured for March 28, 2017 /SHP non-consulting together Cooks and W/P- services - VSAT 175,000 with Niue A06.4 Installation of Vanuatu Hardware (Phase 2) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold Consultants: firms USD$500,000 Contracts at or above the thresholds are subject to the Bank’s procurement prior review. Consultants: individuals USD$300,000 Contracts at or above the thresholds are subject to the Bank’s procurement prior review. 2. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Ref. Description Estimat Packages Domestic Review Comments No. ed Preference by Bank Cost (yes/no) (Prior / US$ Post) PASO Procurement of 275,000 Packages No Prior Procured for /CF/P Consulting Services together with Cooks and - - VSAT Management Vanuatu Niue on A06.2 Contract & Design of QCBS basis Specifications (Phase 2) PASO Procurement of 40,000 No Post /IC/P individual consulting - services of Project A08.2 Manager March 28, 2017 PROCUREMENT Pacific Islands : Pacific Aviation Safety Office Reform PLAN General Information Country: Pacific Islands Bank’s Approval Date of the Original Procurement Plan: 2016-08-11 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145057 GPN Date: Project Name: Pacific Aviation Safety Office Reform Loan / Credit No: IDA / H8830, TF / A3687, IDA / D3190 Technical and Fiduciary Services Unit Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned P A06 4 / VSAT Installation of Component A: Transitional Request for Single Stage - One 2018-06- IDA / H8830 Post Limited 175,000.00 178,556.63 Completed 2018-01-14 2018-08-07 2018-03-11 2018-12-31 Hardware (Phase 2) Management and Support Quotations Envelope 08 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual P A06 1 / VSAT Supply of Component A: Transitional Hardware IDA / H8830 Post Direct Selection Direct 400,000.00 242,061.19 Completed 2017-09-01 2017-09-06 2018-05-21 2017-10-11 2018-11-01 2018-02-08 2019-11-18 Management and Support (Phase 2) PASO/RFQ/P-C03-1-2-3 / IT upgrade - Supply and installation of server, Component C: Quality Request for Single Stage - One Laptop/Dektop, screens IDA / H8830 Post Limited 90,000.00 42,479.77 Completed 2019-05-06 2019-04-08 2019-07-11 2019-06-28 2020-01-07 2019-09-02 Management Quotations Envelope refresh for PASO staff, PBX switchboard and digital handset PASO/RFQ/P-C03-3 / IT Component C: Quality Request for Single Stage - One IDA / H8830 Post Limited 10,000.00 0.00 Canceled 2018-11-05 2019-01-10 2019-07-09 upgrade - Microsoft Licences Management Quotations Envelope PASO/RFQ/P-C03-1 / IT Component C: Quality Request for Single Stage - One Upgrade - Supply and IDA / H8830 Post Limited 30,000.00 0.00 Canceled 2018-11-05 2019-01-10 2019-07-09 Management Quotations Envelope Installation of Server PASO/RFQ/P-C03-2 / IT Component C: Quality Request for Single Stage - One upgrade - Laptop/Desktop, IDA / H8830 Post Limited 30,000.00 0.00 Canceled 2018-11-05 2019-01-10 2019-07-09 Management Quotations Envelope Screens Refresh for PASO Staff PASO/RFB/P-C03-4 / PASO Component C: Quality Request for Single Stage - One IT upgrade - Financial System IDA / H8830 Post Limited 10,000.00 0.00 Canceled 2018-11-05 2019-01-10 2019-07-09 Management Quotations Envelope Upgrade PASO/RFB/P-C04-1 / Component C: Quality Single Stage - Two Information Technology IDA / H8830 Prior Request for Bids Open - International 650,000.00 0.00 Canceled 2019-12-30 2020-01-20 2020-03-31 2020-06-25 2020-07-30 2021-01-26 Management Envelope Platform Pending PASO/RFQG/C03.5 / IT Component A: Transitional Request for Single Stage - One IDA / H8830 Post Open - National 45,000.00 0.00 Implementati 2021-06-06 2021-08-01 2021-08-31 equipment Management and Support Quotations Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual P/C04/3 / PASO Workflow Component C: Quality Single Stage - One IDA / D3190 Post Request for Bids Open - International 220,000.00 0.00 Canceled 2020-02-03 2020-03-16 2020-02-08 2020-03-17 2020-03-21 2020-04-20 2020-05-25 2020-11-21 Solution Management Envelope CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual P A06 2 / VSAT Management Component A: Transitional Quality And Cost- Contract & Design of IDA / H8830 Post Open - International 275,000.00 209,868.51 Completed 2017-03-03 2017-03-24 2017-04-17 2017-06-01 2017-06-02 2017-07-06 2017-07-20 2017-08-02 2017-09-07 2017-08-11 2017-10-12 2017-12-08 2018-10-12 2020-11-02 Management and Support Based Selection Specifications (Phase 2) PASO/LCS/P/A04 / Financial Component A: Transitional Least Cost TF / A3687 Post Open - International 10,000.00 0.00 Canceled 2018-02-15 2018-03-01 2018-03-06 2018-04-03 2018-04-18 2018-04-30 2018-05-17 2019-08-09 Audits Management and Support Selection PASO/LCS/P-A04 / Annual Component A: Transitional Least Cost IDA / H8830 Post Open - International 50,000.00 0.00 Canceled 2018-08-17 2018-08-15 2018-09-28 2018-08-30 2018-11-11 2018-12-09 2019-01-08 2019-02-12 2019-03-19 2019-09-15 Financial Audits Management and Support Selection PASO/QCBS/P-D04-2 / RPAS Component D: Safety Quality And Cost- IDA / H8830 Post Open - International 450,000.00 418,262.00 Signed 2019-02-11 2019-02-11 2019-03-04 2019-02-21 2019-04-17 2019-04-15 2019-05-15 2019-06-20 2019-06-14 2019-06-25 2019-07-19 2019-07-17 2019-08-23 2019-08-06 2020-08-22 Regional Awareness Equipment and Infrastructure Based Selection Campaign PASO/CQS/A11.3 / Consultant STRATEGIC PLANNING Component A: Transitional IDA / H8830 Post Qualification Open - International 110,000.00 144,705.00 Signed 2020-11-15 2020-11-15 2020-12-06 2020-12-01 2021-01-19 2021-01-13 2021-02-18 2021-03-14 2021-03-25 2021-03-22 2021-09-21 ADVISORY SERVICES FOR Management and Support Selection PASO REFORM PROJECT INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PASO/IC/P-A02.2 / LEGAL Individual Component A: Transitional SPECIALIST FOR PASO IDA / H8830 Prior Consultant Open 142,000.00 133,694.00 Completed 2015-02-19 2015-02-19 2016-08-01 Management and Support PROJECT Selection Individual P A082 / PASO Project and Component A: Transitional IDA / H8830 Post Consultant Open 40,000.00 0.00 Canceled 2016-09-06 2016-09-29 2016-10-02 2016-10-10 2016-10-28 2018-10-29 Finance Officer Management and Support Selection Individual P A08 2A / PASO Project Component A: Transitional IDA / H8830 Post Consultant Open 40,000.00 35,752.68 Completed 2017-03-07 2017-04-10 2017-04-25 2017-05-16 2017-05-18 2017-06-20 2017-05-23 2017-12-17 2018-10-31 Manager Management and Support Selection Individual PASO/ICS/P-C02 / PASOnet Component C: Quality IDA / H8830 Post Consultant Open 45,000.00 53,902.00 Completed 2017-04-24 2017-06-12 2017-07-11 2017-07-03 2017-07-27 2017-08-07 2017-07-27 2018-02-03 2018-03-15 IT Strategy Project Management Selection PASO/ICS/P/A02/3 / Individual Component A: Transitional Government & Airline TF / A3687 Post Consultant Open 40,000.00 0.00 Canceled 2018-03-15 2018-04-23 2018-06-01 2018-06-21 2019-12-13 Management and Support Engagement Selection Individual PASO/ICS/P/A02/4 / Legal Component A: Transitional TF / A3687 Post Consultant Open 40,000.00 0.00 Canceled 2018-03-15 2018-04-23 2018-06-01 2018-06-21 2019-06-17 and Remittance Review Management and Support Selection Individual PASO/IC/P/A08/3 / PASO Component A: Transitional IDA / D3190 Post Consultant Open 123,620.00 278,400.00 Completed 2018-06-18 2018-06-22 2018-07-11 2018-07-18 2018-08-06 2018-07-25 2018-08-20 2019-04-25 2020-12-04 REFORM PROJECT MANAGER Management and Support Selection PASO/ICS/P-A11-1 / Individual Implementation of new Component A: Transitional IDA / H8830 Post Consultant Open 50,000.00 0.00 Canceled 2018-08-21 2018-09-10 2018-11-04 2018-12-04 2019-02-02 2019-08-01 funding modality - Legal Management and Support Selection Adviser PASO/ICS/P-A11-2 / Individual Implementation of new Component A: Transitional IDA / H8830 Post Consultant Open 50,000.00 0.00 Canceled 2019-02-07 2019-04-04 2019-04-15 2019-04-30 2020-01-25 funding modality - Financial Management and Support Selection Modelling Individual PASO/ICS/P-C04-2 / IT Component C: Quality IDA / H8830 Post Consultant Open 175,000.00 0.00 Canceled 2018-08-31 2018-09-06 2018-10-19 2018-11-09 2018-12-14 2019-06-12 Advisor Management Selection PASO/DS/P-A04 / Annual Component A: Transitional IDA / H8830 Post Direct Selection Direct 15,000.00 0.00 Canceled 2019-02-15 2019-02-26 2019-02-25 2019-03-27 2022-03-11 Financial Audits Management and Support PASO/ICS/P-A02-1-1 / Individual Component A: Transitional Marketing and IDA / H8830 Post Consultant Open 40,000.00 31,195.34 Completed 2019-02-07 2019-03-11 2019-04-04 2019-06-25 2019-04-15 2019-06-21 2019-04-24 2019-06-28 2019-07-23 2020-11-16 Management and Support Communications Support Selection PASO/IND/P-A11-1 / Individual Implementation of new Component A: Transitional IDA / H8830 Post Consultant Open 50,000.00 47,400.00 Completed 2019-02-04 2019-03-04 2019-04-13 2019-06-20 2019-04-15 2019-06-20 2019-04-30 2019-06-26 2019-09-27 2020-02-29 funding modality - Legal Management and Support Selection adviser Component B: Establishment Individual PASO/ICS/P-B01-2 / IDA / H8830 of a Pool of Regional Aviation Post Consultant Open 180,000.00 186,000.00 Completed 2019-02-04 2019-02-19 2019-04-06 2019-05-01 2019-04-27 2019-05-07 2019-04-30 2019-05-02 2019-10-26 2020-09-28 Regulatory Advisor Inspectors Selection Individual PASO/ICS/P-C04-2 / Component C: Quality IDA / H8830 Post Consultant Open 70,000.00 70,000.00 Completed 2019-04-25 2019-02-19 2019-06-28 2019-05-16 2019-07-08 2019-05-16 2019-07-31 2019-05-30 2020-01-27 2020-03-31 PASOnet Project Manager Management Selection Component B: Establishment Individual PASO/ICS/P-B07 / USOAP IDA / H8830 of a Pool of Regional Aviation Post Consultant Open 180,000.00 122,350.00 Signed 2019-02-15 2019-06-20 2019-04-22 2019-08-07 2019-04-22 2019-08-07 2019-05-03 2019-08-07 2019-10-30 and State Letters Advisor Inspectors Selection Individual P/A12 / PAIP Program Component A: Transitional IDA / D3190 Post Consultant Direct 12,200.00 53,341.70 Signed 2019-12-14 2020-01-23 2019-12-21 2020-01-31 2019-12-24 2020-01-30 2019-12-31 2020-02-01 2020-12-31 Manager Management and Support Selection Individual P/A13 / PAIP Finance Component A: Transitional IDA / D3190 Post Consultant Direct 5,080.00 15,106.20 Signed 2019-12-14 2020-01-23 2019-12-21 2020-01-31 2019-12-24 2020-01-31 2019-12-31 2020-02-01 2020-12-31 Manager Management and Support Selection Individual P/A14 / Procurement Component A: Transitional IDA / D3190 Post Consultant Direct 11,635.00 49,111.00 Signed 2019-12-14 2020-01-23 2019-12-21 2020-01-31 2019-12-24 2020-01-31 2019-12-31 2020-02-01 2020-12-31 Specialist Management and Support Selection Individual P/A15 / Economist & Component A: Transitional IDA / D3190 Post Consultant Open 10,000.00 20,752.16 Signed 2020-01-05 2020-03-19 2020-02-09 2020-04-19 2020-03-01 2020-04-19 2020-03-16 2020-04-24 2020-12-31 Financial Specialist Management and Support Selection Individual Component A: Transitional P/A16 / Aviation Specialist IDA / D3190 Post Consultant Open 24,000.00 74,004.00 Signed 2020-01-05 2020-03-20 2020-03-01 2020-04-16 2020-03-06 2020-04-16 2020-03-16 2020-04-24 2020-12-31 Management and Support Selection Individual P/C04/4 / PASO Scoping Component C: Quality IDA / H8830 Post Consultant Open 30,000.00 0.00 Canceled 2020-02-01 2020-04-05 2020-04-15 2020-05-08 2020-11-04 Study Management Selection Individual Component D: Safety P-A17 / PASO IT ADVISOR IDA / H8830 Post Consultant Open 87,568.00 75,000.00 Signed 2020-04-30 2020-05-08 2020-06-18 2020-07-29 2020-07-09 2020-07-29 2020-08-13 2020-07-31 2021-02-09 Equipment and Infrastructure Selection Individual PASO/INDV/A08.5 / PASO Component A: Transitional IDA / H8830 Post Consultant Open 90,000.00 0.00 Canceled 2020-11-15 2020-11-12 2021-01-03 2020-12-22 2021-01-24 2021-02-28 2021-08-27 Project Manager Management and Support Selection Individual PASO/INDV/A18 / PASO Component A: Transitional IDA / H8830 Post Consultant Open 25,000.00 24,877.91 Signed 2020-11-15 2020-11-12 2021-01-03 2021-02-02 2021-01-24 2021-02-05 2021-02-28 2021-02-05 2021-08-27 Communications Adviser Management and Support Selection Individual PASO/INDV/P-A20 / Graphic/ Component A: Transitional IDA / H8830 Post Consultant Open 15,000.00 0.00 Under Review 2021-06-01 2021-06-23 2021-07-20 2021-08-10 2021-09-14 2021-12-13 Web designer Management and Support Selection Page 2 Individual PASO/INDV/P-A21 / Quality Component C: Quality IDA / H8830 Post Consultant Open 50,000.00 0.00 Under Review 2021-06-01 2021-06-24 2021-07-20 2021-08-10 2021-09-14 2021-12-23 Assurance Specialist Management Selection Page 3 PROCUREMENT PLAN (Textual Part) Project information: Republic of Mali, Mali COVID-19 Emergency Response Project, P-173816 Project Implementation agency: REDISSE 3 - Mali Date of the Procurement Plan: 4/3/2020 Period covered by this Procurement Plan: from 4/6/2020 – to 12/31/2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016), revised November 2017 and August 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in “Décret N° 2015-604/P-RM du 25 Septembre 2015” and “Décret N° 2016-0920 du 6 Décembre 2016”, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: a. open advertising of the procurement opportunity at the national level; b. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; c. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts; d. publication of contract award information; e. rights for the Bank to review procurement documentation and activities; f. maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) and Bank Facilitated Procurement (BFP) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. To support emergency response, the project will utilize rapid disbursement procedures and simplified procurement processes in accordance with emergency operations norms. The proposed procurement approach prioritizes fast track emergency procurement for the emergency goods, works and services needed. Key measures to fast track procurement include: (i) use of simple and fast procurement and selection methods fit for an emergency situation including direct contracting, as appropriate, (ii) streamlined competitive procedures with shorter bidding time, (iii) use of framework agreements including existing ones, (iv) procurement from UN Agencies enabled and expedited by Bank procedures and templates, (v) use of procurement agents, (vi) force account, as needed, and (vii) increased thresholds for Requests For Quotations and national procurement among others, as well as minimal or no prior review for emergency procurement. PROCUREMENT Mali : MALI COVID-19 EMERGENCY RESPONSE PROJECT PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2020-05-19 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173816 GPN Date: 2020-09-29 Project Name: MALI COVID-19 EMERGENCY RESPONSE PROJECT Loan / Credit No: IDA / 66180, TF / B4844 R Executing Agency(ies): egional Disease Surveillance Systems Enhancement WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-REDISSE 3 - MALI- Component 1: Emergency 173450-GO-DIR / Acquisition IDA / 66180 Post Direct Selection Direct 8,500.00 9,031.10 Completed 2020-05-18 2020-05-18 2020-05-23 2020-05-26 2020-06-17 2020-07-08 2020-06-18 2020-07-29 COVID-19 Response de 10 aspirateurs de mucosité ML-REDISSE 3 - MALI- 173451-GO-DIR / Acquisition Component 1: Emergency de 1 respirateur de IDA / 66180 Post Direct Selection Direct 45,000.00 47,209.81 Signed 2020-05-18 2020-05-18 2020-05-23 2020-05-26 2020-06-17 2020-08-04 2020-06-18 COVID-19 Response réanimation et de 1 moniteur multiparamétrique ML-REDISSE 3 - MALI- 173453-GO-DIR / Acquisition Component 1: Emergency de 10 respirateurs de IDA / 66180 Post Direct Selection Direct 460,000.00 504,838.49 Completed 2020-05-18 2020-05-18 2020-05-23 2020-05-26 2020-06-17 2020-06-23 2020-07-08 2020-08-14 COVID-19 Response réanimation et de 10 moniteurs ML-REDISSE 3 - MALI- 173454-GO-DIR / Acquisition Component 1: Emergency IDA / 66180 Post Direct Selection Direct 390,000.00 428,190.31 Signed 2020-05-13 2020-05-18 2020-05-18 2020-05-26 2020-06-12 2020-06-26 2020-06-22 de 10 respirateurs avec COVID-19 Response moniteur greffé ML-REDISSE 3 - MALI- 180665-GO-DIR / Acquisition Component 1: Emergency de 670 boites de tests de IDA / 66180 Post Direct Selection Direct 961,000.00 1,039,775.83 Completed 2020-06-17 2020-06-17 2020-06-22 2020-06-26 2020-07-04 2020-07-22 2020-07-14 2020-08-06 COVID-19 Response diagnostic COVID-19 pour la prise en charge des malades ML-REDISSE 3 - MALI- 180666-GO-DIR / Acquisition Component 1: Emergency de 10 000 kits d’EPI pour la IDA / 66180 Post Direct Selection Direct 420,000.00 451,555.00 Completed 2020-06-18 2020-06-17 2020-06-23 2020-06-26 2020-07-05 2020-07-30 2020-08-09 2020-08-12 COVID-19 Response protection des personnes exposées ML-REDISSE 3 - MALI- 180667-GO-DIR / Acquisition de 211 950 litres d'eau de Under Component 1: Emergency javel et de 148 619 litres de IDA / 66180 Post Direct Selection Direct 1,400,000.00 0.00 Implementati 2020-06-19 2020-06-17 2020-06-24 2020-07-06 2020-08-17 COVID-19 Response gel hydro-alcoolique pour la on protection des personnes exposées ML-REDISSE 3 - MALI- 180668-GO-DIR / Acquisition de 15 000 kits d’EPI pour la Component 1: Emergency IDA / 66180 Post Direct Selection Direct 630,000.00 677,332.50 Completed 2020-06-20 2020-06-17 2020-06-25 2020-06-26 2020-07-07 2020-08-06 2020-07-21 2020-09-25 protection individuelle pour la COVID-19 Response protection des personnes exposées ML-REDISSE 3 - MALI- 180669-GO-DIR / Acquisition de 200 000 masques (N95 ou Component 1: Emergency IDA / 66180 Post Direct Selection Direct 1,090,000.00 1,174,043.00 Completed 2020-06-23 2020-06-17 2020-06-28 2020-06-26 2020-07-10 2020-07-30 2020-07-31 2020-09-25 FFP2) et de 10 000 kits d’EPI COVID-19 Response pour la protection des personnes exposées ML-REDISSE 3 - MALI- 180670-GO-DIR / Acquisition de 83 000 litres de savon Component 1: Emergency liquide, 2 500 000 bavettes IDA / 66180 Post Direct Selection Direct 2,780,000.00 2,651,711.58 Signed 2020-06-24 2020-06-17 2020-06-29 2020-06-26 2020-07-11 2020-07-22 2020-08-22 COVID-19 Response (masques chirurgicaux) et 5 000 kits EPI pour la protection des personnes exposées ML-REDISSE 3 - MALI- 180671-GO-DIR / Acquisition Component 1: Emergency de 4 800 cartons de gants IDA / 66180 Post Direct Selection Direct 290,000.00 221,261.95 Completed 2020-06-25 2020-06-17 2020-06-30 2020-06-26 2020-07-12 2020-07-30 2020-07-13 2020-08-12 COVID-19 Response (carton de 10 boites, boite de 100 pièces) ML-REDISSE 3 - MALI- 184476-GO-DIR / Acquisition Component 3: de 1 716 tablettes pour la Implementation Management collecte et la gestion des IDA / 66180 Post Direct Selection Direct 350,000.00 349,160.97 Signed 2020-07-23 2020-07-13 2020-07-28 2020-08-13 2020-08-16 2021-02-25 2020-09-16 and Monitoring and données par les différents Evaluation échelons des structures sanitaires ML-REDISSE 3 - MALI- 184484-GO-DIR / Acquisition Component 1: Emergency IDA / 66180 Post Direct Selection Direct 750,000.00 743,147.00 Signed 2020-07-22 2020-07-13 2020-07-27 2020-07-07 2020-08-14 2020-07-17 2020-09-25 de 78 moniteurs et de 78 COVID-19 Response défibrilateurs ML-REDISSE 3 - MALI- Component 1: Emergency 184415-GO-DIR / Acquisition IDA / 66180 Post Direct Selection Direct 94,000.00 101,148.32 Completed 2020-07-30 2020-07-30 2020-08-04 2020-08-13 2020-08-16 2020-09-01 2020-08-23 2020-09-09 COVID-19 Response de 20 extracteurs d'oxygène Page 1 ML-REDISSE 3 - MALI- Component 1: Emergency 188777-GO-DIR / Acquisition IDA / 66180 Post Direct Selection Direct 2,100,000.00 2,127,994.50 Completed 2020-08-20 2020-08-13 2020-08-25 2020-08-30 2020-09-15 2020-12-18 2020-09-29 2021-01-08 COVID-19 Response de 50 000 kits d'EPI ML-REDISSE 3 - MALI- 210633-GO-DIR / Acquisition de 167 boites tests de Component 1: Emergency diagnostic COVID-19, 1 727 IDA / 66180 Post Direct Selection Direct 830,000.00 910,255.20 Completed 2020-12-24 2020-12-17 2020-12-29 2020-12-24 2021-01-11 2021-01-15 2021-01-25 2021-02-05 COVID-19 Response boites de kits de prélèvement et 216 boites de kits d'extraction ML-REDISSE 3 - MALI- 221300-GO-DIR / Acquisition de 324 boites de kits d’extraction d’acide Component 1: Emergency TF / B4844 Post Direct Selection Direct 2,523,500.00 2,497,328.23 Completed 2021-02-25 2021-02-25 2021-03-01 2021-01-11 2021-03-09 2021-02-09 2021-03-13 2021-02-15 nucléique, 2 774 boites de COVID-19 Response kits de prélèvement et 959 boites de tests de diagnostic COVID-19 ML-REDISSE 3 - MALI- Component 1: Emergency 221304-GO-DIR / Acquisition TF / B4844 Post Direct Selection Direct 863,596.70 857,647.00 Completed 2021-02-25 2021-02-25 2021-03-01 2021-01-11 2021-03-09 2021-02-09 2021-03-13 2021-02-15 COVID-19 Response de 20 000 kits d’EPI ML-REDISSE 3 - MALI- 228511-GO-RFQ / Component 3: Acquisition de matériels Pending Implementation Management Request for Single Stage - One informatiques et IDA / 66180 Post Limited 42,000.00 0.00 Implementati 2021-05-08 2021-06-16 2021-07-07 and Monitoring and Quotations Envelope téléphoniques pour les on Evaluation experts supplémentaires de l'UCP ML-REDISSE 3 - MALI- 239150-GO-DIR / Acquisition de 1 000 000 masques FFP2 Component 1: Emergency pour la protection des IDA / 66180 Prior Direct Selection Direct 2,600,000.00 0.00 Under Review 2021-06-10 2021-06-15 2021-06-30 2021-07-21 COVID-19 Response personnes exposées dans le cadre de la riposte contre la pandémie COVID-19 au Mali NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-REDISSE 3 - MALI- Under 184423-NC-DIR / Agence de Component 2: Increase IDA / 66180 Post Direct Selection Direct 200,000.00 0.00 Implementati 2020-07-22 2020-07-13 2020-07-27 2020-08-15 2021-03-14 paiements par transferts access to health care services on monétaires ML-REDISSE 3 - MALI- 198058-NC-DIR / Prestations Component 3: pour formalités douanières Implementation Management des équipements, intrants et IDA / 66180 Post Direct Selection Direct 100,000.00 0.00 Canceled 2020-10-14 2020-10-06 2020-10-19 2020-11-10 2021-11-10 and Monitoring and consommables acquis dans le Evaluation cadre de la riposte contre la pandémie COVID-19 au Mali ML-REDISSE 3 - MALI- 233307-NC-DIR / Animation Pending Component 1: Emergency du Centre d’appels du IDA / 66180 Post Direct Selection Direct 135,000.00 0.00 Implementati 2021-05-05 2021-05-10 2021-06-01 2022-03-02 COVID-19 Response Ministère de la Santé et du on Développement Social CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-REDISSE 3 - MALI- Component 3: 184420-CS-UN / Appui Implementation Management UN Agencies opérationnel au système de IDA / 66180 Prior Direct 1,400,000.00 1,127,797.00 Signed 2020-09-08 2021-03-22 2021-09-08 and Monitoring and (Direct) santé du Mali et à la réponse à Evaluation la pandémie de COVID-19 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: ML-REDISSE 3 - MALI- Individual Implementation Management Under 180673-CS-INDV / Assistant IDA / 66180 Post Consultant Open 60,000.00 0.00 2020-07-01 2020-10-09 2020-08-04 2020-08-09 2020-08-12 2022-08-12 and Monitoring and Implementation SPM PIU COVID-19 Selection Evaluation Component 3: ML-REDISSE 3 - MALI- Individual Implementation Management Under 180674-CS-INDV / IDA / 66180 Post Consultant Open 60,000.00 0.00 2020-07-02 2020-10-09 2020-08-05 2020-08-10 2020-08-13 2022-08-13 and Monitoring and Implementation Comptable PIU COVID-19 Selection Evaluation Component 3: ML-REDISSE 3 - MALI- Individual Implementation Management Under 180675-CS-INDV / Assistant IDA / 66180 Post Consultant Open 60,000.00 0.00 2020-07-03 2020-10-12 2020-08-06 2020-08-11 2020-08-14 2022-08-14 and Monitoring and Implementation suivi évaluation PIU COVID-19 Selection Evaluation ML-REDISSE 3 - MALI- Component 3: 184485-CS-CDS / Réalisation Implementation Management des audits financiers et IDA / 66180 Post Direct Selection Direct 50,000.00 36,685.40 Signed 2020-07-23 2020-07-30 2020-08-02 2020-09-04 2020-09-11 2021-03-01 2023-06-30 and Monitoring and comptables semestriels du Evaluation Projet Page 2 ML-REDISSE 3 - MALI- 228513-CS-INDV / Component 3: Actualisation du CGES et du Individual Implementation Management Under PGES du Projet pour tenir IDA / 66180 Post Consultant Direct 34,000.00 0.00 2021-04-16 2021-04-12 2021-04-26 2021-05-10 2021-05-19 2021-06-09 and Monitoring and Implementation compte des activités de la Selection Evaluation campagne de vaccination contre la COVID-19 au Mali ML-REDISSE 3 - MALI- 228514-CS-INDV / Actualisation du manuel de Component 3: procédure de gestion de Individual Implementation Management Under l’emploi et des conditions des IDA / 66180 Post Consultant Direct 20,000.00 0.00 2021-04-16 2021-04-12 2021-04-26 2021-05-10 2021-05-19 2021-06-09 and Monitoring and Implementation travailleurs pour tenir compte Selection Evaluation des activités de la campagne de vaccination contre la COVID-19 au Mali ML-REDISSE 3 - MALI- 228515-CS-INDV / Actualisation du plan de Component 3: Individual mobilisation des parties Implementation Management IDA / 66180 Post Consultant Direct 25,000.00 63,105.31 Completed 2021-04-16 2021-04-12 2021-04-26 2021-04-26 2021-05-10 2021-04-27 2021-05-19 2021-05-05 2021-06-09 2021-06-02 prenantes pour prendre en and Monitoring and Selection compte les activités de la Evaluation campagne de vaccination contre la COVID-19 au Mali Page 3 5. Recommended Procurement Approach for the Project Preamble 1. In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. 2. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. 3. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements 4. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), procurement under World Bank financed operations may be carried out in accordance with “Tendering with Unlimited Participation” method set forth in the Law of the Republic of Tajikistan “Оn Public Procurement of Goods, Works and Services”, # 168 dated March 3, 2006 (as amended by Law #815, the “Law of the Republic of Tajikistan on “Introduction of Amendments and Additions to the Law of the Republic of Tajikistan on ‘Public Procurement of Goods, Works and Services’” dated April 16, 2012), provided that such arrangements continue to meet requirements of the paragraph 5.4 of the Procurement Regulations and the following conditions: • The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, World Bank Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; • The request for bids/request for proposals document, including contract forms, acceptable to the Bank shall be used. • The request for bids/request for proposals document and contract shall provide the right to the Bank to review procurement documentation and activities. • Borrower shall put in place an effective complaints review mechanism with procurement related complaints and shall disclose the details in all the bidding documents. All complaints shall be recorded by the Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. • No preference shall be applied under competitive bidding following national market approach. 5. Other national procurement arrangements such as tendering with limited participation, request for quotations, direct contracting, may be used on the above stated conditions. 6. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable.” 7. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations “Not Applicable.” 8. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): “Not Applicable.” Procurement Plan for the Project. The recommended procurement plan for the project is given in the Table below: Estima Procure Start/Co ted ment Selecti mpletion Bank amoun approach on Evaluatio dates Description oversi t in / metho n method ght (USD Competit d $) ion Software and Substantia June hardware to lly 2020- improve 100 National, responsive Septembe 000 RFQ Post HMIS FRD at Open and lowest r 2020 the central evaluated level cost Substantia April lly 2020- July Replication of 50 000 National, responsive 2020 the PBF Open RFQ Post and lowest materials evaluated cost Substantia April lly 2020- July Replication of 50 000 National, responsive 2020 material for Open RFQ Post and lowest households evaluated cost Substantia Septembe lly r 2020- IT equipment 300 National, responsive December for new 000 Open RFB Post and lowest 2020 districs evaluated cost Substantia March Medical National, RFB Post lly 2021- equipment for Open responsive June 2021 RHC in Sogd 390 and lowest and Khatlon 000 evaluated cost Substantia April lly 2021- July Medical 200 National, responsive 2021 furniture for 000 Open RFB Post and lowest RHC evaluated cost Substantia January lly 2021- Medical bags 450 National, responsive April 2022 for doctors 000 Open RFB Post and lowest and nurses evaluated cost Substantia Septembe Procurment of lly r 2020- alterntive 335 National, responsive December power supply RFB Post 000 Open and lowest 2020 (sollar evaluated pannel) cost Substantia October Ongoing lly 2021- repair works 800 National, responsive October in RHC and 000 Open RFB Post and lowest 2022 HS in pilot evaluated rayons cost Technical June Based on assistance for 100 National/Op 2020- CQS Post qualificati patients 000 en April 2022 ons registry TA on May deepening of 2020- Internation capitation Based on December 200 al/ formula + re- National/Op CQS Post qualificati 2021 000 establishment en ons of incentive payments Piloting population registers in medical Internation Based on facilities of 500 al/ May QCBS Post qualificati the FRD 000 National/Op 2020- en ons system and December deployment 2020 of DHIS-2 in the project areas and the integration of the database / PBF function June Conducting 165 2020- independent Direct Direct Post Direct 000 May 2022 Verification Block May 2022 Project audit 30 000 LCS Post audit Total planned cost under additional financing Total amount №№ Costs Category % (USD equivalent) 1 PBF Payments 3,300,000.00 27.49% Internet costs - Expansion of RBF to 2 additional districts 0.96% 115,000.00 3 Goods 15.62% 1,875,000.00 4 Works 6.66% 800,000.00 5 Consulting Services 8.70% 1,045,000.00 6 Trainings 24.53% 2,945,000.00 16.04 7 Operational expenditure 1,925,992.00 % 100.00 8 TOTAL 12,005,992.0 % 0 PROCUREMENT Tajikistan : Tajikistan Health Services Improvement Project (HSIP) PLAN General Information Country: Tajikistan Bank’s Approval Date of the Original Procurement Plan: 2020-03-10 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P126130 GPN Date: 2020-06-08 Project Name: Tajikistan Health Services Improvement Project (HSIP) Loan / Credit No: IDA / D0700, IDA / D5470, TF / B2817 M Executing Agency(ies): inistry of Health and Social Protection of the Republic of Tajikistan WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOHSP/HSIP_AF2/RFB- Pending W/021/001 / Procurement of Component 2: Primary Health Single Stage - One 2022-05- IDA / D5470 Post Request for Bids Open - National 0.00 Implementat 2021-07-20 2021-07-25 2021-09-05 2021-10-05 2021-11-09 minor rehabilitation works for Care Strengthening Envelope 08 ion new PBF facilities GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOHSP/HSIP_AF1/SHG/20/00 Component 1: Performance Request for Single Stage - One 1 / Replication of Clinical IDA / D0700 Post Open - National 72,839.35 Completed 2020-08-16 2020-10-11 2020-08-28 2020-11-25 2020-09-30 Based Financing Quotations Envelope Protocols MOHSP/HSIP_AF1/SHG/020/0 02 / Procurement of Component 2: Primary Health Request for Single Stage - One IDA / D0700 Post Open - National 25,444.71 Completed 2020-08-31 2020-09-14 2020-09-25 2020-09-20 2020-09-28 Thermoscanners and Pulse Care Strengthening Quotations Envelope Oximeters MOHSP/HSIP_AF2/RFQ/020/0 Pending 01 / Enhancement of PBF Component 1: Performance Request for Single Stage - One IDA / D5470 Post Open - National 0.00 Implementati 2021-05-11 2021-07-06 2022-01-02 hardware and software at Based Financing Quotations Envelope on central level MOHSP/HSIP_AF2/RFB- Pending G/021/002 / Procurment of Component 2: Primary Health Single Stage - One IDA / D5470 Post Request for Bids Open - National 0.00 Implementati 2021-05-03 2021-05-08 2021-06-19 2021-07-19 2021-08-23 2022-02-19 medical equipment for new Care Strengthening Envelope on PBF facilities MOHSP/HSIP_AF2/RFB- G/021/003 / bags with basic Under Component 2: Primary Health Single Stage - One medical equipment for IDA / D5470 Post Request for Bids Open - National 0.00 Implementati 2021-03-08 2021-04-21 2021-03-13 2021-04-22 2021-04-24 2021-05-24 2021-06-28 2021-12-25 Care Strengthening Envelope primary care doctors and on nurses MOHSP/HSIP_AF2/RFQ/020/0 Component 1: Performance Request for Single Stage - One 02 / Replication of the PBF IDA / D5470 Post Open - National 27,687.67 Completed 2021-02-03 2021-03-31 2021-02-22 2021-05-15 2021-03-18 Based Financing Quotations Envelope materials MOHSP/HSIP_AF2/RFB- G/020/001 / Procurment of Under Component 2: Primary Health Single Stage - One computers equipment - IDA / D5470 Post Request for Bids Open - National 0.00 Implementati 2021-01-20 2021-04-12 2021-01-25 2021-04-13 2021-03-08 2021-04-07 2021-04-21 2021-08-19 Care Strengthening Envelope Expansion of RBF to additional on districts for new districs MOHSP/HSIP_AF2/RFB- Under G/021/004 / Procurement of Component 2: Primary Health Single Stage - One IDA / D5470 Post Request for Bids Open - National 0.00 Implementati 2021-05-11 2021-05-11 2021-05-11 2021-05-12 2021-06-01 2021-06-21 2021-07-17 2021-10-15 solar panels for rural health Care Strengthening Envelope on centers MOHSP/HSIP_AF2/RFB- G/021/005 / Replication of Under Component 1: Performance Single Stage - One household engagement TF / B2817 Post Request for Bids Open - National 0.00 Implementati 2021-05-11 2021-05-11 2021-05-11 2021-05-12 2021-05-13 2021-06-02 2021-06-09 2021-08-18 Based Financing Envelope materials and immunization on information materials. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOHSP/HSIP_AF2/CQS/021/0 Consultant 02 / TA on deepening of Component 1: Performance IDA / D5470 Post Qualification Open - International 0.00 Canceled 2021-01-13 2021-02-03 2021-03-19 2021-04-18 2021-05-23 2021-11-19 capitation formula + Based Financing Selection integration of PBF MOHSP/HSIP_AF2/CQS/021/0 Consultant 04 / TA for independent Component 2: Primary Health IDA / D5470 Post Qualification Open - International 0.00 Canceled 2021-02-10 2021-03-03 2021-04-16 2021-05-16 2021-06-20 2021-12-17 verification of facility site Care Strengthening Selection survey MOHSP/HSIP_AF2/CQS/021/0 Consultant Component 1: Performance Pending 01 / TA for population IDA / D5470 Post Qualification Open - National 0.00 2021-04-11 2021-05-02 2021-06-15 2021-07-15 2021-08-19 2022-02-15 Based Financing Implementation registries Selection Page 1 MOHSP/HSIP_AF2/CQS/021/0 07 / CONSULTING SERVICES Consultant Component 1: Performance Under TO DESIGN THE GRIEVANCE TF / B2817 Post Qualification Open - National 0.00 2021-04-08 2021-04-08 2021-04-29 2021-04-15 2021-06-12 2021-07-12 2021-08-16 2022-02-12 Based Financing Implementation MANAGEMENT & Selection INFORMATION SYSTEM (GMIS) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Project Individual TJ-MOHSP-162110-CS-INDV IDA / D0700 Management, Coordination, Prior Consultant Open 0.00 Canceled 2020-03-04 2020-03-13 2020-04-22 2020-05-13 2020-06-17 2020-12-14 / Selection of project officer and Monitoring & Evaluation Selection MOHSP/HSIP_AF1/SSS/020/00 1 / Selection of international Component 1: Performance consultant for development of IDA / D0700 Post Direct Selection Direct 21,920.00 Completed 2020-03-10 2020-03-11 2020-03-20 2020-03-17 2020-05-24 2020-03-27 2020-11-20 2020-07-31 Based Financing the household engagement manual and its piloting Component 3: Project Individual MOHSP/HSIP/LIC/014/001 / IDA / D0700 Management, Coordination, Post Consultant Open 3,000.00 Completed 2020-03-18 2020-06-30 2020-05-06 2020-08-14 2020-05-27 2020-08-14 2020-07-01 2020-08-17 2020-12-28 2020-09-30 Selection of Project officer and Monitoring & Evaluation Selection MOHSP/HSIP/LIC/014/049 / Component 3: Project Individual Selection of procurement IDA / D0700 Management, Coordination, Post Consultant Open 211.89 Completed 2020-03-20 2020-03-20 2020-05-08 2020-05-04 2020-05-29 2020-05-08 2020-07-03 2020-05-04 2020-12-30 2020-09-30 consultant and Monitoring & Evaluation Selection MOHSP/HSIP_AF1/LIC/020/00 Individual Component 2: Primary Health 2 / Selection of Training IDA / D0700 Post Consultant Open 3,000.00 Completed 2020-06-15 2020-06-15 2020-08-03 2020-08-17 2020-08-24 2020-08-17 2020-09-28 2020-08-18 2021-03-27 2020-10-01 Care Strengthening Coordinator Selection Component 3: Project Individual HSIP/LIC/014/002 / IDA / D0700 Management, Coordination, Post Consultant Direct 19,519.22 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Procurement Assistant and Monitoring & Evaluation Selection Component 3: Project Individual HSIP/LIC/014/007 / Office IDA / D0700 Management, Coordination, Post Consultant Direct 19,187.84 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Manager and Monitoring & Evaluation Selection Component 3: Project Individual HSIP/LIC/014/017 / Project IDA / D0700 Management, Coordination, Post Consultant Direct 16,604.29 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 PubIic Relations Consultant and Monitoring & Evaluation Selection Individual HSIP/LIC/014/025 / PBF Component 1: Performance IDA / D0700 Post Consultant Direct 11,003.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Management Head Specialist Based Financing Selection HSIP/LIC/016/001 / Individual Consultant on monitoring of Component 1: Performance IDA / D0700 Post Consultant Direct 13,500.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 per capita implementation Based Financing Selection and update of regulations HSIP/LIC/014/030 / Individual Component 1: Performance Verification Commission IDA / D0700 Post Consultant Direct 9,620.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Based Financing Coordinator Selection HSIP/LIC/018/001 / Component 3: Project Individual Consultant off-balance sheet IDA / D0700 Management, Coordination, Post Consultant Direct 15,112.49 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 accounting and and Monitoring & Evaluation Selection fixed assets inventory HSIP/LIC/014/010 / Component 3: Project Individual Translator/Interpreter IDA / D0700 Management, Coordination, Post Consultant Direct 15,081.54 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Eng/Rus-1 and Monitoring & Evaluation Selection HSIP/LIC/014/012 / Component 3: Project Individual Translator/Interpreter IDA / D0700 Management, Coordination, Post Consultant Direct 14,518.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Rus/Tajik and Monitoring & Evaluation Selection Component 3: Project Individual HSIP/LIC/018/003 / Project IDA / D0700 Management, Coordination, Post Consultant Direct 14,210.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 M&E Consultant and Monitoring & Evaluation Selection HSIP/LIC/014/021 / Component 3: Project Individual Implementation Specialist in IDA / D0700 Management, Coordination, Post Consultant Direct 16,450.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Khatlon Oblast and Monitoring & Evaluation Selection HSIP/LIC/017/003 / Quality Individual Component 1: Performance improvement specialist in IDA / D0700 Post Consultant Direct 6,475.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Based Financing Khatlon Oblast Selection Individual HSIP/LIC/014/040 / PBF MIS Component 1: Performance IDA / D0700 Post Consultant Direct 10,350.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Data Monitoring Specialist Based Financing Selection HSIP/LIC/014/020B / Component 3: Project Individual Implementation Specialist in IDA / D0700 Management, Coordination, Post Consultant Direct 17,427.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Sughd Oblast and Monitoring & Evaluation Selection HSIP/LIC/017/002 / Quality Individual Component 1: Performance improvement specialist in IDA / D0700 Post Consultant Direct 8,325.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Based Financing Sughd Oblast Selection Individual HSIP/LIC/014/035 / RBF MIS Component 1: Performance IDA / D0700 Post Consultant Direct 10,350.00 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 Data Monitoring Specialist Based Financing Selection Individual HSIP/LIC/014/016 / RBF Component 1: Performance IDA / D0700 Post Consultant Direct 22,387.39 Completed 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-01-01 2020-07-31 2020-10-01 HMIS Consultant Based Financing Selection Page 2 MOHSP/HSIP_AF2/CQS/021/0 02-2 / TA ON DEEPENING OF Component 1: Performance IDA / D5470 Post Direct Selection Direct 121,306.59 Signed 2021-01-20 2021-02-15 2021-01-30 2021-02-23 2021-04-05 2021-05-03 2021-10-02 CAPITATION FORMULA AND Based Financing INTEGRATION OF PBF MOHSP/HSIP_AF2/SSS/021/00 5 / TA for household Component 1: Performance TF / B2817 Post Direct Selection Direct 9,333.33 Completed 2021-02-18 2021-02-25 2021-02-28 2021-03-02 2021-05-04 2021-03-09 2021-10-31 2021-05-03 engagement manual Based Financing development MOHSP/HSIP_AF2/ICS/021/00 6 / Technical assistance for Individual the software development Component 1: Performance IDA / D5470 Post Consultant Open 0.00 Canceled 2021-03-10 2021-03-10 2021-04-28 2021-05-19 2021-06-23 2021-12-20 /web developer of the Based Financing Selection financial module of the web pbf mis & accounting system MOHSP/HSIP_AF2/DS/021/00 6 / Technical Assistance for the software development Component 1: Performance IDA / D5470 Post Direct Selection Direct 13,500.00 Signed 2021-03-29 2021-03-26 2021-04-08 2021-03-29 2021-06-12 2021-04-01 2021-12-09 /web developer of the Based Financing financial module of the Web PBF MIS & Accounting System MOHSP/HSIP_AF2/DS/021/00 Individual 4 / TA for independent Component 2: Primary Health IDA / D5470 Post Consultant Direct 49,590.00 Signed 2021-05-26 2021-05-27 2021-06-05 2021-06-15 2021-06-26 2021-06-18 2021-07-31 2021-06-14 2022-01-27 verification of facility site Care Strengthening Selection survey Page 3 PROCUREMENT PLAN (Textual Part) Project information: Uzbekistan Prosperous Villages (P168233) Project Implementation agency: PIU under the MOE Date of the Procurement Plan: October 3, 2019 Period covered by this Procurement Plan: October 2019 to March 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market, procurement under World Bank financed operations may be carried out in accordance with “Single-Stage Bidding” method set forth in the Public Procurement Law of the Republic of Uzbekistan dated April 9, 2018(the “PPL), provided that such arrangements continue to meet requirements of the paragraph 5.4 of the Procurement Regulations and the following conditions: • The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; • Bidding documents, including contract forms, acceptable to the Bank shall be used. • The Bidding process shall not be cancelled sole on the reason that minimum bid price is larger than the amount allocated by procuring entity for this procurement. • There shall be no preference applied during procurement of works. • Implementing agency shall have an option to publish procurement notice without disclosing cost estimate. Other national procurement arrangements (other than national open competitive procurement) that may be applied by the Borrower shall be consistent with paragraphs 5.5 and 5.6 of the Procurement Regulations. E-Procurement system in Republic of Uzbekistan will be used to facilitate the e- procurement transactions for World Bank financed projects when the country’s own national procurement procedures will be used. In this regard, the e-Reverse Auction module and e-Catalog module can be used for Bank-funded procurement following national market approach for simple goods and works. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables - Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. - Not Applicable Other Relevant Procurement Information. PROCUREMENT Uzbekistan : Rural Infrastructure Development Project PLAN General Information Country: Uzbekistan Bank’s Approval Date of the Original Procurement Plan: 2019-09-05 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168233 GPN Date: 2020-03-24 Project Name: Rural Infrastructure Development Project Loan / Credit No: TF / A9749, IDA / 65020, COFN / C1750 M Executing Agency(ies): inistry of Economy and Industry of Uzbekistan WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MOEI-RIDP-AND-W-01 / Demand-driven investments Request for Bids - Construction of a secondary Under in basic infrastructure and Single Stage - One Small Works SPD 2021-11- school in Sokhil MCA, COFN / C1750 Post Request for Bids Open - National 900,000.00 0.00 Implementat 2021-06-07 2021-06-15 2021-06-12 2021-07-12 2021-07-27 2021-08-15 services and local governance Envelope (1 envelope 13 Pakhtaabad district, Andijan ion capacity support process) region MOEI-RIDP-DJI-W-01 / Demand-driven investments Request for Bids - Pending Reconstruction of a secondary in basic infrastructure and Single Stage - One Small Works SPD 2021-11- COFN / C1750 Post Request for Bids Open - National 425,000.00 0.00 Implementat 2021-06-07 2021-06-12 2021-07-12 2021-07-27 2021-08-15 school in Saroy MCA, Bakhmal services and local governance Envelope (1 envelope 13 ion district, Djizzakh region capacity support process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOEI-PVP-G-1 / Computer Project management, Pending Request for Single Stage - One and office equipment for PIU IDA / 65020 monitoring and evaluation, Post Open - National 30,000.00 0.00 Implementati 2021-03-02 2021-04-27 2021-10-24 Quotations Envelope staff and capacity building on Project management, Pending MOEI-PVP-G-2 / Purchase of Request for Single Stage - One IDA / 65020 monitoring and evaluation, Post Open - National 60,000.00 0.00 Implementati 2021-03-06 2021-05-01 2021-10-28 vehicles (3 vehicles) Quotations Envelope and capacity building on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Demand-driven investments Consultant MOEI-PVOQ-CS-1 / Financial in basic infrastructure and Under TF / A9749 Post Qualification Open - National 11,000.00 0.00 2019-10-08 2020-04-08 2019-10-29 2019-12-12 2020-01-11 2020-02-15 2020-08-13 audit services and local governance Implementation Selection capacity support Demand-driven investments Consultant MOEI-PVOQ-CS-5 / MIS in basic infrastructure and Pending TF / A9749 Post Qualification Open - National 12,000.00 0.00 2019-09-05 2019-09-26 2019-11-09 2019-12-09 2020-01-13 2020-07-11 Software services and local governance Implementation Selection capacity support Demand-driven investments Consultant MOEI-PVP-CS-4 / Technical in basic infrastructure and Pending IDA / 65020 Post Qualification Open - International 200,000.00 0.00 2020-06-08 2020-06-29 2020-08-12 2020-09-11 2020-10-16 2021-04-14 Audits services and local governance Implementation Selection capacity support MOEI-PVP-CS-2 / Facilitating Demand-driven investments Partner(s) for activities under in basic infrastructure and Quality And Cost- IDA / 65020 Prior Open - National 11,700,000.00 0.00 Canceled 2019-12-20 2019-12-16 2020-01-10 2019-12-17 2020-02-23 2020-03-22 2020-04-21 2020-05-26 2020-06-30 2021-06-30 Component 1b (at least two services and local governance Based Selection separate contracts) capacity support MOEI-PVP-CS-2-2 / Demand-driven investments Facilitating Partner(s) for in basic infrastructure and Quality And Cost- IDA / 65020 Prior Open - International 2,500,000.00 1,543,500.00 Signed 2020-04-05 2020-06-17 2020-04-26 2020-06-09 2020-11-03 2020-07-07 2020-12-15 2020-08-06 2021-03-12 2020-09-10 2021-05-07 2020-10-15 2021-05-21 2023-10-15 activities under Component services and local governance Based Selection 1b from Namangan region capacity support MOEI-PVP-CS-2-1 / Demand-driven investments Facilitating Partner(s) for in basic infrastructure and Quality And Cost- activities under Component IDA / 65020 Prior Open - International 2,500,000.00 1,549,356.38 Signed 2020-04-05 2020-06-17 2020-04-26 2020-06-09 2020-11-04 2020-07-07 2020-12-15 2020-08-06 2021-03-12 2020-09-10 2021-05-07 2020-10-15 2021-05-12 2023-10-15 services and local governance Based Selection 1b from Andijan and capacity support Ferghana regions MOEI-PVP-CS-8-1 / Demand-driven investments Consultant CONSULTING SERVICES FOR in basic infrastructure and IDA / 65020 Post Qualification Open - National 50,000.00 49,670.81 Signed 2020-11-24 2020-11-25 2020-12-15 2020-12-08 2020-12-29 2021-03-12 2021-01-12 2021-04-26 2021-01-15 2021-05-06 2021-04-15 BASELINE PROJECT services and local governance Selection MONITORING SURVEY capacity support Demand-driven investments MOEI-PVP-CS-8 / Baseline, Consultant in basic infrastructure and Midline and Endline Surveys IDA / 65020 Post Qualification Open - National 150,000.00 0.00 Canceled 2020-02-02 2020-02-23 2020-04-07 2020-05-07 2020-06-11 2020-12-08 services and local governance and Impact Assesmen Selection capacity support MOEI-PVP-CS-11 / Training Demand-driven investments for Regional Hokimiyats on Consultant in basic infrastructure and Procurement, Public Financial IDA / 65020 Post Qualification Open - National 450,000.00 0.00 Canceled 2020-06-01 2020-06-22 2020-08-05 2020-09-04 2020-10-09 2021-04-07 services and local governance Management and Oversight (2 Selection capacity support separate contracts) Page 1 Demand-driven investments Consultant MOEI-PVOQ-CS-2 / Public in basic infrastructure and TF / A9749 Post Qualification Open - National 12,600.00 0.00 Canceled 2019-09-05 2019-09-26 2019-11-09 2019-12-09 2020-01-13 2020-07-11 awareness campaign (PR) services and local governance Selection capacity support Demand-driven investments MOEI-PVP-CS-9 / Consultant in basic infrastructure and Technology for Citizen IDA / 65020 Post Qualification Open - International 400,000.00 0.00 Canceled 2020-07-01 2020-07-22 2020-09-04 2020-10-04 2020-11-08 2021-05-07 services and local governance Engagement Selection capacity support MOEI-PVP-CS-3 / Development of technical manual, online training Demand-driven investments modules, and mobile Consultant in basic infrastructure and applications to monitor TF / A9749 Post Qualification Open - International 500,000.00 0.00 Canceled 2020-01-20 2020-02-10 2020-03-25 2020-04-24 2020-05-29 2020-11-25 services and local governance infrastructure quality and Selection capacity support provision of infrastructure master trainers (multiple contracts) MOEI-PVP-CS-5 / Communication strategy and Demand-driven investments Consultant implemementation which in basic infrastructure and IDA / 65020 Post Qualification Open - International 200,000.00 0.00 Canceled 2020-02-03 2020-02-24 2020-04-08 2020-05-08 2020-06-12 2020-12-09 include production of services and local governance Selection informational material for capacity support local governments, and others Demand-driven investments MOEI-PVOQ-CS-3 / ESMF Consultant in basic infrastructure and Pending and RPF Drafting and TF / A9749 Post Qualification Open - National 20,000.00 0.00 2021-02-25 2021-03-18 2021-05-01 2021-05-31 2021-07-05 2022-01-01 services and local governance Implementation Consultations Selection capacity support Demand-driven investments Consultant MOEI-PVP-CS-7 / Financial in basic infrastructure and Pending IDA / 65020 Post Qualification Open - National 6,000.00 0.00 2021-03-15 2021-04-05 2021-05-19 2021-06-18 2021-07-23 2022-01-19 Management Software services and local governance Implementation Selection capacity support Demand-driven investments MOEI-PVP-CS-6 / Financial in basic infrastructure and Least Cost Pending IDA / 65020 Post Open - National 15,000.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2024-01-09 Audit services and local governance Selection Implementation capacity support MOEI-RIDP-DJI-CS-03 / Design services for the "`Rehabilitation of tertiary Demand-driven investments roads" of settlements included in basic infrastructure and Fixed Budget IDA / 65020 Post Open - National 11,500.00 0.00 Canceled 2021-05-27 2021-05-28 2021-05-27 2021-05-28 2021-06-07 2021-06-08 2021-06-13 2021-06-19 2021-08-08 in makhalla citizens’ assembly services and local governance Selection (MCA) "Oikor", "Temirkadam", capacity support "Madaniyat" of Bakhmal district of JIzzakh region MOEI-RIDP-DJI-CS-02 / Design services for "Reconstruction of power supply systems of Demand-driven investments settlements" included in the in basic infrastructure and Fixed Budget IDA / 65020 Post Open - National 9,000.00 0.00 Canceled 2021-05-26 2021-05-28 2021-05-26 2021-05-27 2021-06-06 2021-06-09 2021-06-11 2021-06-17 2021-08-06 Mahalla Citizens Assembly services and local governance Selection (MCA) "Molguzar", "Sangzor", capacity support "Uzunbulok", "Madaniyat" of the Bakhmal district into the Jizzakh region. MOEI-RIDP-DJI-CS-05 / Design services for Reconstruction of the drinking Demand-driven investments water supply system of the in basic infrastructure and Fixed Budget IDA / 65020 Post Open - National 11,000.00 0.00 Canceled 2021-05-27 2021-05-28 2021-05-27 2021-05-28 2021-06-07 2021-06-12 2021-06-20 2021-07-16 2021-09-09 settlements included in the services and local governance Selection "Molguzar", "Sangzor" MCA of capacity support Bakhmal district of Jizzakh region MOEI-RIDP-DJI-CS-06 / Design services for the Demand-driven investments reconstruction of a system for in basic infrastructure and Fixed Budget providing drinking water to IDA / 65020 Post Open - National 5,500.00 0.00 Canceled 2021-05-27 2021-05-28 2021-05-27 2021-05-28 2021-06-07 2021-06-12 2021-06-20 2021-06-26 2021-08-20 services and local governance Selection settlements included in the capacity support Uzunbulok MCA of Bakhmal district of Jizzakh region MOEI-RIDP-AND-CS-01 / Demand-driven investments Design services for the in basic infrastructure and Fixed Budget IDA / 65020 Post Open - National 23,000.00 0.00 Canceled 2021-05-27 2021-04-01 2021-05-27 2021-05-28 2021-06-07 2021-06-09 2021-06-13 2021-06-18 2021-08-17 construction of school in services and local governance Selection Sokhil MCA, Andijan region capacity support MOEI-RIDP-DJI-CS-04 / Design services for Demand-driven investments Construction of a small in basic infrastructure and Fixed Budget bridge" in the (MCA) Mahalla IDA / 65020 Post Open - National 1,000.00 0.00 Canceled 2021-05-27 2021-05-28 2021-05-27 2021-05-28 2021-06-07 2021-06-12 2021-06-22 2021-06-27 2021-07-27 services and local governance Selection Citizens Assembly "Bakhmal" capacity support of the Bakhmal district of the Jizzakh region. MOEI-RIDP-DJI-CS-01 / Demand-driven investments Detailed Design services for in basic infrastructure and Fixed Budget IDA / 65020 Post Open - National 7,000.00 0.00 Canceled 2021-05-21 2021-04-01 2021-05-21 2021-05-22 2021-05-25 2021-05-29 2021-06-01 2021-06-05 2021-08-04 the school reconstruction in services and local governance Selection Saroy MCA, Jizzakh region capacity support MOEI-RIDP-DJI-CS-07 / Design services for Reconstruction of potable Demand-driven investments water supply system of the in basic infrastructure and Fixed Budget IDA / 65020 Post Open - National 8,000.00 0.00 Canceled 2021-05-27 2021-05-28 2021-05-27 2021-05-28 2021-06-07 2021-06-12 2021-06-20 2021-06-26 2021-08-15 settlements included in MCA services and local governance Selection "Muzbulok", "Oikor", "Temir capacity support Kadam", "Bakhmal" of Bakhmal district of the Jizzakh region INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 MOEI-PVOQ-CS-4 / Participatory Village Selection Demand-driven investments and Planning Pilot in basic infrastructure and TF / A9749 Prior Direct Selection Direct 30,800.00 27,768.86 Signed 2019-09-05 2019-09-30 2019-09-15 2019-10-02 2019-11-19 2019-10-03 2020-05-17 “Taraqqiyot” Center for services and local governance Development of the Well- capacity support Being of Population Demand-driven investments Individual MOEI-PVOQ-IC-3 / in basic infrastructure and TF / A9749 Post Consultant Open 5,500.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 Environmental Specialist services and local governance Selection capacity support Demand-driven investments Individual MOEI-PVOQ-IC-5 / Financial in basic infrastructure and TF / A9749 Post Consultant Open 7,700.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 Management Specialist services and local governance Selection capacity support Demand-driven investments Individual MOEI-PVOQ-IC-10 / HR in basic infrastructure and TF / A9749 Post Consultant Open 5,000.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 manager services and local governance Selection capacity support Demand-driven investments MOEI-PVOQ-IC-4 / Individual in basic infrastructure and Community Mobilization TF / A9749 Post Consultant Open 6,000.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 services and local governance Specialis Selection capacity support Demand-driven investments Individual MOEI-PVOQ-IC-2 / Social in basic infrastructure and TF / A9749 Post Consultant Open 7,700.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 Safeguards specialist services and local governance Selection capacity support Demand-driven investments Individual MOEI-PVOQ-IC-8 / in basic infrastructure and TF / A9749 Post Consultant Open 7,000.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 Translator services and local governance Selection capacity support Demand-driven investments Individual MOEI-PVOQ-IC-7 / MIS in basic infrastructure and TF / A9749 Post Consultant Open 6,000.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 Specialist services and local governance Selection capacity support Demand-driven investments Individual MOEI-PVOQ-IC-6 / in basic infrastructure and TF / A9749 Post Consultant Open 7,700.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 Procurement Specialist services and local governance Selection capacity support Demand-driven investments Individual MOEI-PVOQ-IC-9 / in basic infrastructure and TF / A9749 Post Consultant Open 5,500.00 0.00 Canceled 2019-09-05 2019-10-24 2019-11-14 2019-12-19 2020-06-16 Infrastructure specialist services and local governance Selection capacity support Page 3 Procurement Plan for Liaoning Safe and Sustainable Urban Water Supply Project Loan No. : 88370 I. General 1. Project information: The project will finance investments in the construction, repair/ rehabilitation and upgrading of water supply infrastructure facilities and technical assistance to improve operational and management capacities of participating five water supply companies, namely Anshan, Fushun, Fuxin, Gaizhou and Shenyang Water Companies. The project development objectives are to improve water quality and operational efficiency of selected water supply utilities in the project areas. Procurement for the proposed project will be carried out in accordance with the World Bank’s "Guidelines: Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits and Grants by World Bank Borrowers" dated January 2011, revised July 2014, and "Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank Borrowers" dated January 2011, revised July 2014, and the provisions stipulated in the legal agreements. “Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants dated October 2006 and revised Jan 2011” shall apply to the project.“Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants, dated October 2006 and revised Jan 2011” shall apply to the project. The project procurement plan dated January 17, 2018 for the whole period of project implementation, prepared by Liaoning PPMO, has been submitted and reviewed by the World Bank. It will also be available in the project’s database, on the World Bank’s external website and at PPMO’s office. The procurement plan will be updated in agreement with the World Bank annually or as required to reflect actual project implementation needs and improvement in institutional capacity. Further details on procurement are provided in the project procurement plan. All procurement of project will be carried out by Liaoning PPMO( Liaoning Urban Construction and Renewal Project Management Company Limited ) and each city’s PIU. Detail project implementation agencies of each city are as following table: No. Project City Implementation agency 1 Shenyang Shenyang Water Supply Group 2 Anshan Anshan Water Supply Co. 3 Fushun Fushun Water Supply Co. 4 Fuxin Fuxin Water Supply Co. 5 Gaizhou Gaizhou Water Supply Co. 1 2. Bank’s approval Date of the procurement Plan: Original: March 2018 3. Date of General Procurement Notice: March 9, 2018 4. Period covered by this procurement plan: The procurement period of project covered from year May 2018 to August 2021 II. Goods and Works and Non-consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for procurement: Thresholds for applicable procurement methods of the Project have been determined as following table: Thresholds for Procurement Methods and Prior Review Expenditure Contract Value Procurement Prior Review Threshold Category Threshold (US$) Method (US$) ≥40,000,000 ICB 1. Civil works <40,000,000 NCB ≥US$15 million <500,000 Shopping ≥10,000,000 ICB 2. Goods <10,000,000 NCB ≥US$4 million <500,000 Shopping Notes: ICB: International Competitive Bidding NCB: National Competitive Bidding DC: Direct Contracting 2. Prequalification: Not applicable. 3. Reference to Project Operational/Procurement Manual: Management manual for World Bank Loan Project in Liaoning Province issued by Liaoning Financial Bureau. 4. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: No applicable. 5. Any Other Special Procurement Arrangements: Not applicable. 2 6. Procurement Packages with Methods and Time Schedule 1 2 3 4 5 6 7 Comment s Expected (Expecte Tender Estimated Procurem Review by d Ref. Contract Name Advertiseme Cost (USD ent Bank Duration No. Description nt x 106) Method (Prior/Post) of Publication Contract: Date Months) Anshan Water Supply       1. Civil Works Water distribution pipe network Non Bank AS-C01 5.28 7/2018 18 reconstruction project (A) Finance Water distribution pipe network AS-C02 4.38 NCB Post 8/2018 18 reconstruction project (B) Building pipeline reconstruction project AS-C03 7.26 NCB Post 10/2018 18 in Tiedong, Tiexi District Building pipeline reconstruction project AS-C04 in development zone, Qianshan, Lishan 5.36 NCB Post 3/2019 18 District 2. Goods and Non-consulting Services   Supply and installation of equipment, AS-E01 8.48 ICB(Goods) Prior 6/2018 18 materials for water source pumping station and water plant Supply and installation of equipment AS-E02 and water-meter for secondary boosting 6.23 ICB(Goods) Prior 5/2019 18 pumping stations (A) Supply and installation of equipment AS-E03 5.08 ICB(Goods) Prior 5/2019 16 and water-meter for secondary boosting 3 1 2 3 4 5 6 7 Comment s Expected (Expecte Tender Estimated Procurem Review by d Ref. Contract Name Advertiseme Cost (USD ent Bank Duration No. Description nt x 106) Method (Prior/Post) of Publication Contract: Date Months) pumping stations (B) Supply and installation of equipments of AS-E04 4.60 ICB(Goods) Prior 5/2019 18 SMART water Valve, pipe network maintenance AS-E05 equipment, engineering vehicles 2.53 ICB(Goods) Post 10/2018 16 procurement AS-E06 Office equipment 0.10 Shopping Post 5/2018 12 Institutional strengthening, training and AS-E07 0.13 Shopping Post 5/2018 60 investigation 3. Subtotal     Fuxin Water Supply     1. Civil Works     Water supply facilities reconstruction FX-C01 4.25 NCB Post 6/2018 18 project in old residential district (A) FX-C02 Water supply pipe network (A) 5.77 NCB Post 6/2019 16 Water supply facilities reconstruction FX-C03 3.40 NCB Post 3/2019 18 project in old residential district (B) Reconstruction of Naodehai water plant FX-C04 and construction of secondary boosting 1.23 NCB Post 4/2019 18 pumping stations FX-C05 Water supply pipe network (B) 3.26 NCB Post 11/2019 10 Water supply pipe network Non Bank FX-C06 2.89   6/2020 10 reconstruction project (A) Finance 4 1 2 3 4 5 6 7 Comment s Expected (Expecte Tender Estimated Procurem Review by d Ref. Contract Name Advertiseme Cost (USD ent Bank Duration No. Description nt x 106) Method (Prior/Post) of Publication Contract: Date Months) Water supply pipe network Non Bank FX-C07 3.37   11/2020 18 reconstruction project (B) Finance Water supply pipe network FX-C08 0.95 NCB Post 8/2021 8 reconstruction project (C) 2. Goods and Non-consulting Services 0.00   Procurement of equipment materials for FX-E01 0.89 NCB(goods) Post 6/2018 18 Water supply facilities in old residential district FX-E02 Procurement of GPS system 1.42 ICB(IT) Prior 7/2018 18 Procurement of water quality testing FX-E03 1.62 ICB(Goods) Prior 9/2018 6 equipment Supply and installation of equipments of FX-E04 3.33 ICB(goods) Prior 10/2018 10 SMART water Supply and installation of equipment for FX-E05 Naodehai water plant and secondary 1.68 ICB(Goods) Prior 4/2019 10 boosting pumping stations FX-E06 Office equipment 0.10 Shopping Post 5/2018 12 Institutional strengthening, training and FX-E07 0.13 Shopping Post 5/2018 60 investigation 3. Subtotal Fushun Water Supply 1. Civil Works 5 1 2 3 4 5 6 7 Comment s Expected (Expecte Tender Estimated Procurem Review by d Ref. Contract Name Advertiseme Cost (USD ent Bank Duration No. Description nt x 106) Method (Prior/Post) of Publication Contract: Date Months) Water distribution pipe network FS-C01 3.67 NCB Post 7/2018 16 reconstruction project (A) Water distribution pipe network FS-C02 2.80 NCB Post 4/2019 16 reconstruction project (B) Water distribution pipe network FS-C03 2.86 NCB Post 4/2020 16 reconstruction project (C) Water distribution pipe network FS-C04 2.91 NCB Post 4/2021 16 reconstruction project (D) Building pipeline reconstruction project FS- in Dongzhou,Hetai and Henan District 6.99 NCB Post 7/2018 18 C05-1 (A) FS- Building pipeline reconstruction project 6.61 NCB Post C05-2 in Hebei and Fengzhe District (B) FS- Building pipeline reconstruction project 5.61 NCB Post 4/2019 18 C06-1 in Hebei and Fengzhe District (A) Building pipeline reconstruction project FS- in Dongzhou,Hetai and Henan District 7.16 NCB Post C06-2 (C) Building pipeline reconstruction project FS-  Non Bank in Dongzhou,Hetai and Henan District 7.95   4/2020 18 C07-1 Finance (B) FS- Building pipeline reconstruction project 5.85 NCB Post 4/2020 18 C07-2 in Hebei and Fengzhe District (C) FS- Building pipeline reconstruction project  Non Bank 6.60   4/2021 18 C08-1 in Dongzhou,Hetai and Henan District Finance 6 1 2 3 4 5 6 7 Comment s Expected (Expecte Tender Estimated Procurem Review by d Ref. Contract Name Advertiseme Cost (USD ent Bank Duration No. Description nt x 106) Method (Prior/Post) of Publication Contract: Date Months) (D) FS- Building pipeline reconstruction project 5.51 NCB Post 4/2021 18 C08-2 in Hebei and Fengzhe District (D) 2. Goods and Non-consulting Services Supply and installation of equipment for FS-E01 secondary boosting pumping stations 2.78 ICB(Goods) Post 7/2018 18 (A) Supply and installation of equipment for Non Bank FS-E02 secondary boosting pumping stations 3.02   4/2020 18 Finance  (B) Pipe network emergency repair FS-E03 2.13 ICB(Goods) Post 7/2018 8 equipment Supply and installation of equipments of FS-E04 1.27 NCB(goods) Post 10/2018 18 SMART water (A) Supply and installation of equipments of FS-E05 5.53 ICB(Goods) Prior 10/2018 18 SMART water (B) Supply and installation of equipments of FS-E06 1.16 NCB(goods) Post 10/2018 12 SMART water (C) FS-E07 Office equipment 0.10 Shopping Post 10/2018 12 Institutional strengthening, training and FS-E08 0.13 Shopping Post 5/2018 60 investigation 3. Subtotal Gaizhou Water Supply 1. Civil Works 7 1 2 3 4 5 6 7 Comment s Expected (Expecte Tender Estimated Procurem Review by d Ref. Contract Name Advertiseme Cost (USD ent Bank Duration No. Description nt x 106) Method (Prior/Post) of Publication Contract: Date Months) Pipeline and water meter works (zone A GZ-C01 7.34 NCB Post 7/2018 18 ) Pipeline and water meter works (zone B GZ-C02 5.11 NCB Post 9/2018 18 ) Pipeline and water meter works (zone C GZ-C03 5.30 NCB Post 1/2019 18 ) Construction of main water supply  Non Bank GZ-C04 6.62   5/2020 18 pipeline Finance GZ-C05 Reconstruction of water plant 1.01 NCB Post 11/2020 18 2. Goods and Non-consulting Services Supply and installation of equipments of GZ-E01 3.15 ICB(Goods) Post 7/2018 18 SMART water GZ-E02 Operation and maintenance equipment 1.31 NCB(goods) Post 7/2018 18 GZ-E03 Office equipment 0.10 Shopping Post 7/2018 12 Institutional strengthening, training and GZ-E04 0.13 Shopping Post 7/2018 60 investigation 3. Subtotal Shenyang Water Supply 1. Civil Works Reconstruction of building pipeline  Non Bank SY-C01 reconstruction and secondary boosting 15.48   7/2018 16 Finance pumping stations SY-C02 Reconstruction and construction of 2.98 NCB Post 7/2018 18 8 1 2 3 4 5 6 7 Comment s Expected (Expecte Tender Estimated Procurem Review by d Ref. Contract Name Advertiseme Cost (USD ent Bank Duration No. Description nt x 106) Method (Prior/Post) of Publication Contract: Date Months) water distribution pipe network in Heping and Yuhong districts Reconstruction and construction of SY-C03 water distribution pipe network in 6.90 NCB Post 7/2018 15 Sujiatun and Shenhe districts Construction of water distribution pipe SY-C04 6.25 NCB Post 12/2018 12 network in Huanggu district Reconstruction and construction of SY-C05 water distribution pipe network in 12.54 NCB Post 2/2019 18 Huanggu and Tiexi districts Reconstruction and construction of SY-C06 water distribution pipe network in 12.31 NCB Post 12/2018 18 huanggu districts Reconstruction of water distribution SY-C07 12.39 NCB Post 9/2018 18 pipe network in huanggu districts Reconstruction of water distribution SY-C08 pipe network in Dadong,Shenhe, 4.23 NCB Post 9/2019 18 Huanggu and Heping districts Reconstruction and construction of SY-C09 water distribution pipe network in 3.57 NCB Post 2/2020 18 Heping and Tiexi districts 2. Goods and Non-consulting Services Water quality testing equipment and SY-E01 1.40 ICB Goods) Post 7/2018 12 leak detection equipment SY-E02 Water supply network repair machinery 1.58 ICB Goods) Post 7/2018 10 9 1 2 3 4 5 6 7 Comment s Expected (Expecte Tender Estimated Procurem Review by d Ref. Contract Name Advertiseme Cost (USD ent Bank Duration No. Description nt x 106) Method (Prior/Post) of Publication Contract: Date Months) and equipment Online monitoring system (DCS) of SY-E03 Water plan tand water source pump 4.86 ICB Goods) Prior 7/2018 18 station Online monitoring system of secondary SY-E04 6.87 ICB Goods) Prior 7/2018 18 boosting pump stations Equipments of online monitoring SY-E05 system of secondary boosting pump 8.41 ICB Goods) Prior 12/2019 18 stations and water-meter Pipe network geographic information SY-E06 2.88 ICB(IT) Post 7/2018 18 system SY-E07 Platform of SMART water supply 1.59 ICB(IT) Post 7/2018 18 SY-E08 Water supply network analysis platform 1.57 ICB(IT) Post 12/2018 18 SY-E09 Office equipment 0.10 Shopping Post 7/2018 12 Institutional strengthening, training and SY-E10 0.13 Shopping Post 7/2018 60 investigation 3. Subtotal Total for Works, Goods and Non-consulting       services . 10 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Expenditur Contract Value Procurement Bank Prior Review e Category (US$) Method ≥300,000 QCBS/QBS/LCS/FBS Consultant ≥US$2 million <300,000 CQS s Individual Consultant ≥US$400,000 Notes: QCBS: Quality- and Cost- SSS: Single Source Selection Based Selection IC: Individual Consultant selection QBS: Quality-Based Selection procedure CQS: Selection Based on the FBS: Fix Budget Selection Consultants’ Qualifications LCS: Least Cost Selection 2. Short list comprising entirely of national consultants: Short lists of consultants (firms) for services estimated to cost less than US$500,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Comment Expecte s Estimate Selecti Review d (Expecte d Description of on by Bank REOI d Ref. No. Cost Assignment Metho (Prior / Publicat Duration (US$ d Post) ion of million) Date Contract: Months) Technical assistance Construction FX- drawings (detailed) Post Prio 0.32 QCBS 5/2018 48 ZX01 design for Fuxin r TOR  Project Engineering FX- supervision for Civil Post Prio 0.25 QCBS 5/2018 60 ZX02 Works for Fuxin r TOR  Project Construction GZ- drawings (detailed) Post Prio 1.08 QCBS 5/2018 48 ZX01 design for Gaizhou r TOR  Project GZ- Engineering 0.50 FBS Post Prio 7/2018 60 11 ZX02 supervision for Civil r TOR  Works for Gaizhou Project Engineering SY- Post Prio supervision for Civil 1.80 FBS 7/2018 60 ZX01 r TOR  Works Project management LN- consultants service 3.60 QCBS Prior 5/2018 60 ZX01 and IT contracts supervision Researchr on NRW, energy saving, KPI, Institutional LN- Post Prio strengthening and 0.40 QCBS 5/2018 60 ZX02 r TOR  benchmarking for Water Supply Companies Provincial institutional LN- strengthening, 0.35 QCBS Post 5/2018 60 ZX03 training and investigation LN- Study on PPP Policy 0.20 CQS Post 5/2018 18 ZX04 of Water Industry Subtotal of TA 12 PROCUREMENT China : China: Liaoning Safe and Sustainable Urban Water Supply Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-03-28 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158713 GPN Date: 2018-03-09 Project Name: China: Liaoning Safe and Sustainable Urban Water Supply Project Loan / Credit No: IBRD / 88370, / L Executing Agency(ies): iaoning Urban Construction and Renewal Project Office WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-C01 / Gaizhou City Component 1: Water supply Single Stage - One 4,974,657.1 2020-12- Pipeline and water meter IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2019-05-15 2019-05-15 2019-05-17 2019-05-27 2019-06-16 2019-06-27 2019-06-23 2019-10-28 2019-07-07 2019-11-15 Envelope 9 28 works (zone A ) improvement Component 1: Water supply GZ-C05 / Rehabilitation of Single Stage - One 2021-02- IBRD / 88370 service infrastructure Post Request for Bids Open - National 963,781.26 Signed 2019-06-10 2019-06-12 2019-06-21 2019-06-13 2019-07-21 2019-07-15 2019-08-04 2019-07-18 2019-08-23 2019-08-12 existing water plants Envelope 13 improvement FS-C01 / Rehabilitation of municipal water distribution pipelines(A) 2019 upgrading plan: Haixin Component 1: Water supply River to Shanshang Single Stage - One 6,346,170.9 2021-03- IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2019-07-26 2019-07-23 2019-07-31 2019-07-25 2019-08-30 2019-09-09 2019-09-13 2019-09-23 2019-10-04 2019-10-15 Lianluomen, Tawan pump Envelope 2 27 improvement station to Meikuang Dianjichang, Taian Street, Liuhe Street and other sections (30 roads in total) FS-C05-1 / Rehabilitation of water distribution pipelines of residential quarters in Dongzhou,Hetai and Henan Component 1: Water supply Single Stage - One 4,946,415.6 2021-03- District (A) IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2019-07-26 2019-07-25 2019-07-31 2019-07-25 2019-08-30 2019-09-09 2019-09-13 2019-09-23 2019-09-27 2019-10-15 Envelope 1 20 Gaoshan Road Laomo improvement residential department and other districts (30 districts in total); FS-C05-2 / Rehabilitation of water distribution pipelines of residential quarters in Hebei Component 1: Water supply Single Stage - One 4,158,852.3 2021-03- and Fengzhe District (A) IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2019-07-26 2019-07-23 2019-07-31 2019-07-25 2019-08-30 2019-09-09 2019-09-13 2019-09-23 2019-09-27 2019-10-15 Envelope 6 20 Xifeng District, Taian District, improvement and other districts (46 districts in total) FS-C06-1 / Rehabilitation of water distribution pipelines of residential quarters in Component 1: Water supply Single Stage - One 3,144,872.1 2021-03- Dongzhou, Hetai and Henan IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2019-07-26 2019-07-23 2019-07-31 2019-07-25 2019-08-30 2019-09-09 2019-09-13 2019-09-27 2019-10-15 Envelope 7 20 District (B) improvement Donggang Districts and other districts (23 districts in total) FS-C06-2 / Rehabilitation of water distribution pipelines of Component 1: Water supply residential quarters in Hebei Single Stage - One 2,951,477.7 2021-03- IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2019-07-26 2019-07-23 2019-07-31 2019-07-25 2019-08-30 2019-09-09 2019-09-13 2019-09-23 2019-09-27 2019-10-15 and Fengzhe (B) Envelope 9 20 improvement Yixi District and other districts (24 districts in total) AS-C02 / Water distribution Component 1: Water supply Pending Single Stage - One 2022-05- pipe network rehabilitation IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-09-15 2020-09-20 2020-10-20 2020-11-03 2020-11-24 Envelope 18 project in old pipe network (B) improvement ion AS-C04 / Building pipeline Component 1: Water supply Single Stage - One 5,728,328.8 2021-12- rehabilitation project in IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2020-04-14 2020-06-29 2020-04-19 2020-06-29 2020-05-19 2020-07-30 2020-06-02 2020-08-25 2020-06-23 2020-09-28 Envelope 6 15 Lishan and Tiexi District improvement FS-C03 / Rehabilitation of Component 1: Water supply Under Single Stage - One 2021-11- municipal water distribution IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-03-20 2021-05-28 2020-03-25 2021-05-27 2020-04-24 2020-05-08 2020-05-29 Envelope 20 pipelines(C) improvement ion FS-C04 / Rehabilitation of Component 1: Water supply Under Single Stage - One 2022-12- municipal water distribution IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-04-10 2021-05-28 2021-04-15 2021-05-27 2021-05-15 2021-05-29 2021-06-19 Envelope 11 pipelines (D) improvement ion FS-C07-1 / Rehabilitation of water distribution pipelines of Component 1: Water supply Under Single Stage - One 2021-11- residential quarters in IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-03-20 2021-05-28 2020-03-25 2021-05-27 2020-04-24 2020-05-08 2020-05-22 Envelope 13 Dongzhou,Hetai and Henan improvement ion District (C) FS-C07-2 / Rehabilitation of Component 1: Water supply Under water distribution pipelines of Single Stage - One 2021-11- IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-03-20 2021-05-28 2020-03-25 2021-05-27 2020-04-24 2020-05-08 2020-05-22 residential quarters in Hebei Envelope 13 improvement ion and Fengzhe District (C) Component 1: Water supply GZ-C02 / Water pipelines Single Stage - One 5,622,442.6 2021-08- IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2019-12-15 2020-01-14 2019-12-20 2020-01-14 2020-01-19 2020-03-05 2020-01-26 2020-03-10 2020-02-09 2020-03-27 and water meters in Area B Envelope 9 02 improvement Component 1: Water supply Pending GZ-C03 / Water pipelines Single Stage - One 2021-11- IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-04-01 2020-04-06 2020-05-06 2020-05-13 2020-05-27 and water meters in Area C Envelope 18 improvement ion Component 1: Water supply Pending GZ-C04 / Purified water Single Stage - One 2022-10- IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-02-26 2021-03-05 2021-04-04 2021-04-18 2021-05-07 transmission pipelines Envelope 29 improvement ion Page 1 SY-C02 / Area-based rehabilitation and Component 1: Water supply Pending Single Stage - One 2022-01- construction of water IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-05-31 2020-06-07 2020-07-07 2020-07-21 2020-08-04 Envelope 26 distribution pipe network in improvement ion Heping and Yuhong Districts SY-C03 / Area-based rehabilitation and Component 1: Water supply Pending Single Stage - One 2022-01- construction of water IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-05-31 2020-06-07 2020-07-07 2020-07-21 2020-08-04 Envelope 26 distribution pipe network in improvement ion Sujiatun and Shenhe Districts SY-C04 / Construction of Component 1: Water supply Pending water distribution pipe Single Stage - One 2022-09- IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-01-30 2021-02-06 2021-03-08 2021-03-22 2021-04-05 network on Wenda Road in Envelope 27 improvement ion Huanggu District SY-C05 / Area-based rehabilitation and Component 1: Water supply Pending Single Stage - One 2022-09- construction of water IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-01-30 2021-02-06 2021-03-08 2021-03-22 2021-04-05 Envelope 27 distribution pipe network in improvement ion Huanggu and Tiexi Districts SY-C07 / Rehabilitation of Component 1: Water supply Pending water distribution pipe Single Stage - One 2022-09- IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-01-30 2021-02-06 2021-03-08 2021-03-22 2021-04-05 network on Hushitai Da Street Envelope 27 improvement ion in Huanggu District SY-C08 / Area-based rehabilitation of water Component 1: Water supply Pending Single Stage - One 2022-09- distribution pipe network in IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-01-30 2021-02-06 2021-03-08 2021-03-22 2021-04-05 Envelope 27 Dadong, Shenhe, Huanggu improvement ion and Heping Districts SY-C09 / Area-based rehabilitation and Component 1: Water supply Pending Single Stage - One 2022-09- construction of water IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-01-30 2021-02-06 2021-03-08 2021-03-22 2021-04-05 Envelope 27 distribution pipe network in improvement ion Huanggu and Heping Districts FX-C01 / Rehabilitation of Component 1: Water supply Single Stage - One 7,218,542.7 2021-08- water supply facilities in Fuxin IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2019-12-10 2020-06-30 2019-12-15 2020-07-06 2020-01-14 2020-07-31 2020-01-28 2020-08-25 2020-02-11 2020-09-01 Envelope 6 04 old residential district (A) improvement FX-C02 / Construction of Component 1: Water supply Pending Single Stage - One 2022-09- Fuxin new water supply IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-01-22 2021-01-27 2021-02-26 2021-03-12 2021-03-26 Envelope 17 pipelines (A) improvement ion FX-C05 / Construction of Component 1: Water supply Pending Single Stage - One 2022-08- Fuxin new water supply IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-12-17 2020-12-22 2021-01-21 2021-02-04 2021-02-18 Envelope 12 pipelines (B) improvement ion FX-C06 / Fuxin Rehabilitation of Fuxin water supply Component 1: Water supply Under pipelines (A), civil works and Single Stage - One 2021-09- IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-01-22 2021-05-10 2020-01-27 2021-05-09 2020-02-26 2020-03-11 2020-03-25 equipment supply of booster Envelope 16 improvement ion pump stations in Development Zone FX-C07 / Rehabilitation of Component 1: Water supply Pending Single Stage - One 2022-08- Fuxin water supply pipelines IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-12-17 2020-12-22 2021-01-21 2021-02-04 2021-02-18 Envelope 12 (B) improvement ion FX-C08 / Construction of Component 1: Water supply Pending Single Stage - One 2022-09- Fuxin new water supply IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2021-02-02 2021-02-07 2021-03-09 2021-03-23 2021-04-06 Envelope 28 pipelines (C) improvement ion AS-E01 / Equipments supply and installation of Wangjiayu Component 1: Water supply Under water plant and Tanghe water Single Stage - One 2022-03- IBRD / 88370 service infrastructure Post Request for Bids Open - International 0.00 Implementat 2020-07-10 2021-05-10 2020-07-15 2021-05-09 2020-08-26 2020-09-02 2020-09-23 source pumping station Envelope 17 improvement ion rehibilitation for high standard SY-C01 / Rehabilitation of pipelines of residential Component 1: Water supply Single Stage - One 2021-11- quarters; Rehabilitation of IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Canceled 2020-03-22 2020-03-29 2020-04-28 2020-05-12 2020-05-26 Envelope 17 secondary boosting pumping improvement stations AS-E02-1 / Supply and Component 1: Water supply Under installation of equipment and Single Stage - One 2022-05- IBRD / 88370 service infrastructure Post Request for Bids Open - International 0.00 Implementat 2020-08-25 2021-05-06 2020-08-30 2021-05-06 2020-10-11 2020-10-18 2020-11-08 water-meter for secondary Envelope 02 improvement ion boosting pumping stations Component 1: Water supply Pending FS-E04-1 / SMART water Single Stage - One 2021-12- IBRD / 88370 service infrastructure Post Request for Bids Open - International 0.00 Implementat 2020-04-05 2020-04-10 2020-05-22 2020-05-29 2020-06-19 system (A) Envelope 11 improvement ion SY-C01-1 / Rehabilitation of Component 1: Water supply Under Single Stage - One 2021-11- water supply pipelines in IBRD / 88370 service infrastructure Post Request for Bids Open - National 0.00 Implementat 2020-03-20 2020-11-17 2020-03-27 2020-11-18 2020-04-26 2020-12-18 2020-05-10 2020-05-24 Envelope 15 residential areas improvement ion SY-E11 / Supply and Component 1: Water supply Under installation of equipment for Single Stage - One 2021-11- IBRD / 88370 service infrastructure Post Request for Bids Open - International 0.00 Implementat 2020-03-20 2021-06-01 2020-03-25 2021-05-31 2020-05-06 2020-05-13 2020-06-03 secondary boosting pumping Envelope 25 improvement ion stations AS-C03 / Building pipeline Component 1: Water supply rehabilitation project in Single Stage - One 5,802,084.7 2022-03- IBRD / 88370 service infrastructure Post Request for Bids Open - National Signed 2020-06-29 2020-06-29 2020-06-30 2020-06-29 2020-07-30 2020-07-30 2020-08-13 2020-08-25 2020-09-11 2020-09-28 Tiedong, Development Zone Envelope 1 05 improvement and Qianshan District GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Component 1: Water supply FX-E06 / Fuxin PMO office Request for Single Stage - One IBRD / 88370 service infrastructure Post Limited 86,460.93 Signed 2019-06-24 2019-09-24 2019-07-27 2019-10-25 2020-07-21 equipments Quotations Envelope improvement Component 1: Water supply GZ-E02 / Opertion and Single Stage - One IBRD / 88370 service infrastructure Post Request for Bids Open - International 2,385,986.05 Signed 2019-06-18 2019-06-20 2019-06-21 2019-06-20 2019-08-02 2019-08-02 2019-08-07 2019-08-09 2019-08-22 2019-09-05 2021-02-12 meintenance equipment Envelope improvement FS-E09 / SMART water system (D) Component 1: Water supply 1900 pieces of wireless Request for Single Stage - One IBRD / 88370 service infrastructure Post Limited 172,061.69 Signed 2019-08-02 2019-07-30 2019-09-20 2019-09-03 2020-09-14 remote transmission water Quotations Envelope improvement meters and relevant software procurement Component 2: Water supply GZ-E03 / Gazhou PMO office Request for Single Stage - One IBRD / 88370 service management Post Limited 112,517.44 Signed 2019-07-31 2019-07-31 2019-09-04 2019-09-05 2020-08-29 equipments Quotations Envelope improvement Component 2: Water supply GZ-E05 / 5 emergency Request for Single Stage - One IBRD / 88370 service management Post Limited 102,918.26 Signed 2019-07-31 2019-08-30 2019-09-04 2019-10-10 2021-02-25 reparie vehicles Quotations Envelope improvement AS-E02 / Supply and Component 1: Water supply installation of equipment and Single Stage - One IBRD / 88370 service infrastructure Prior Request for Bids Open - International 0.00 Canceled 2020-08-23 2020-08-30 2020-10-11 2020-10-16 2020-10-31 2022-04-24 water-meter for secondary Envelope improvement boosting pumping stations AS-E03 / Supply and installation of equipment for central control room, power automatic control equipment, Component 1: Water supply Under Single Stage - One and automatic control lifiting IBRD / 88370 service infrastructure Post Request for Bids Open - International 0.00 Implementati 2020-08-23 2021-01-15 2020-08-30 2021-01-14 2020-10-11 2020-10-16 2020-10-31 2022-04-24 Envelope equiment of secondary improvement on boosting pumping stations; and procurement and installation of water meters AS-E04 / Supply and Component 2: Water supply installation of main Single Stage - One IBRD / 88370 service management Post Request for Bids Open - International 0.00 Canceled 2020-05-23 2020-05-30 2020-07-11 2020-07-16 2020-07-31 2022-01-22 equipment of start water Envelope improvement management system AS-E05 / Supply of maintenance equipment, Component 1: Water supply Single Stage - One emergence repair equipment, IBRD / 88370 service infrastructure Post Request for Bids Open - International 2,947,761.17 Signed 2020-06-23 2020-06-28 2020-06-30 2020-06-28 2020-08-11 2020-08-11 2020-08-16 2020-08-14 2020-08-31 2020-09-17 2022-02-22 Envelope network equipment and water improvement quality monitoring equipment Component 1: Water supply AS-E08 / Supply and Single Stage - One IBRD / 88370 service infrastructure Post Request for Bids Open - International 4,746,592.34 Signed 2020-02-21 2020-03-09 2020-02-28 2020-03-12 2020-04-10 2020-04-24 2020-04-15 2020-10-15 2020-04-30 2020-06-05 2021-10-22 installation of water meters Envelope improvement Component 2: Water supply FS-E03 / Pipeline emergency Single Stage - One IBRD / 88370 service management Post Request for Bids Open - International 1,925,373.12 Signed 2019-11-13 2020-06-02 2019-11-20 2020-06-03 2020-01-01 2020-07-16 2020-01-06 2020-07-27 2020-01-21 2020-09-10 2021-07-14 repair equipment Envelope improvement Component 2: Water supply FS-E04 / SMART water Single Stage - One IBRD / 88370 service management Post Request for Bids Open - International 0.00 Canceled 2020-04-03 2020-04-10 2020-05-22 2020-05-27 2020-06-11 2021-12-03 system (A) Envelope improvement Component 2: Water supply FS-E05 / SMART water Single Stage - One IBRD / 88370 service management Post Request for Bids Open - International 4,431,853.41 Signed 2020-04-03 2021-01-14 2020-04-10 2021-01-14 2020-05-22 2021-03-11 2020-05-27 2021-03-19 2020-06-11 2021-04-20 2021-12-03 system (B) Envelope improvement Component 2: Water supply FS-E06 / SMART water Single Stage - One IBRD / 88370 service management Post Request for Bids Open - National 0.00 Canceled 2020-03-29 2019-09-24 2020-04-05 2020-05-17 2019-10-12 2020-05-22 2020-06-06 2021-11-28 system (C) Envelope improvement Component 2: Water supply FS-E07 / Fushun PMO Office Request for Single Stage - One IBRD / 88370 service management Post Limited 102,723.28 Signed 2019-12-20 2020-06-02 2020-01-22 2020-07-09 2021-01-16 equipments Quotations Envelope improvement Component 2: Water supply GZ-E01 / Pipeline smart Single Stage - One IBRD / 88370 service management Post Request for Bids Open - National 3,089,845.44 Signed 2019-11-28 2020-07-03 2019-12-05 2020-07-05 2020-01-16 2020-08-06 2020-01-21 2020-08-19 2020-02-05 2020-09-30 2021-07-29 management system Envelope improvement SY-E01 / Water quality Component 2: Water supply Single Stage - One testing equipment and leak IBRD / 88370 service management Post Request for Bids Open - International 1,329,001.84 Signed 2019-12-07 2020-02-10 2019-12-14 2020-02-18 2020-01-25 2020-04-02 2020-01-30 2020-04-14 2020-02-14 2020-05-19 2021-08-07 Envelope detection equipment improvement SY-E02 / Water supply Component 1: Water supply Single Stage - One network repair machinery and IBRD / 88370 service infrastructure Post Request for Bids Open - International 1,980,149.24 Signed 2019-12-07 2020-02-26 2019-12-14 2020-02-26 2020-01-25 2020-04-09 2020-01-30 2020-04-16 2020-02-14 2020-05-22 2021-02-08 Envelope equipment and flow meters improvement SY-E03 / Online monitoring Component 2: Water supply Pending system (DCS) of water plant Single Stage - One IBRD / 88370 service management Post Request for Bids Open - International 0.00 Implementati 2020-04-12 2020-04-19 2020-05-31 2020-06-05 2020-06-20 2021-12-12 and water source pump Envelope improvement on station SY-E04 / Remote online moni Component 2: Water supply Under Single Stage - One toring system of secondary bo IBRD / 88370 service management Prior Request for Bids Open - International 0.00 Implementati 2019-12-22 2021-01-17 2019-12-29 2020-02-09 2020-02-14 2020-02-29 2021-08-22 Envelope osting pump stations A improvement on SY-E05 / Remote online moni Component 2: Water supply Under Single Stage - One toring system of secondary bo IBRD / 88370 service management Prior Request for Bids Open - International 0.00 Implementati 2020-06-08 2020-12-18 2020-06-15 2021-01-15 2020-07-27 2021-04-15 2020-08-01 2021-05-07 2020-08-16 2022-02-07 Envelope osting pump stations B improvement on SY-E06 / Pipe network Component 2: Water supply geographic information Single Stage - One IBRD / 88370 service management Prior Request for Bids Open - National 0.00 Canceled 2019-12-22 2020-04-21 2019-12-29 2020-05-06 2020-02-09 2020-06-05 2020-02-14 2020-10-11 2020-02-29 2021-08-22 system (GIS) and Platform of Envelope improvement SMART water supply Component 2: Water supply SY-E09 / Shenyang PMO Request for Single Stage - One IBRD / 88370 service management Post Limited 126,491.90 Signed 2019-12-29 2020-05-07 2020-02-02 2020-07-01 2021-01-27 office equipments Quotations Envelope improvement Page 3 FX-E01 / Procurement of Component 1: Water supply equipment and materials for Single Stage - One IBRD / 88370 service infrastructure Post Request for Bids Open - International 3,103,027.90 Signed 2019-11-23 2019-12-05 2019-11-30 2019-12-06 2020-01-11 2020-01-17 2020-01-16 2020-01-22 2020-01-31 2020-02-28 2021-07-24 water supply facilities in old Envelope improvement residential district FX-E03 / Procurement of Component 2: Water supply Single Stage - One water quality testing IBRD / 88370 service management Post Request for Bids Open - International 1,450,973.47 Signed 2019-12-23 2020-09-29 2019-12-30 2020-10-11 2020-02-10 2020-11-24 2020-02-17 2020-12-10 2020-03-09 2021-01-12 2020-03-14 Envelope equipmen improvement FX-E04 / Fuxin smart water infrastructure online Component 1: Water supply monitoring equipment Single Stage - One IBRD / 88370 service infrastructure Post Request for Bids Open - International 2,625,960.11 Signed 2020-01-23 2021-01-14 2020-01-30 2021-01-14 2020-03-12 2021-03-10 2020-03-17 2021-03-19 2020-04-01 2021-04-20 2021-09-23 procurement and emergency Envelope improvement repair equipment and leakage detecting equipment SY-E06-1 / Rebid for SY-E06, Pipe network geographic Component 2: Water supply Under Single Stage - One information system (GIS) and IBRD / 88370 service management Prior Request for Bids Open - National 0.00 Implementati 2020-11-03 2020-11-26 2020-11-17 2020-12-01 2020-12-17 2021-02-24 2020-12-31 2021-03-31 2021-02-02 2022-07-27 Envelope Platform of SMART water improvement on supply Component 2: Water supply Under FS-E06-1 / SMART water Single Stage - One IBRD / 88370 service management Prior Request for Bids Open - National 0.00 Implementati 2021-06-01 2021-06-15 2021-07-15 2021-07-29 2021-08-17 2023-02-08 system (C) Envelope improvement on AS-E04-1 / Supply and Component 2: Water supply Pending installation of software and Single Stage - One IBRD / 88370 service management Prior Request for Bids Open - National 0.00 Implementati 2021-06-01 2021-06-15 2021-07-15 2021-07-29 2021-08-17 2023-02-08 equipment of SMART water Envelope improvement on system SY-E08 / Area-based water Component 2: Water supply Pending Single Stage - One supply network analysis IBRD / 88370 service management Post Request for Bids Open - National 0.00 Implementati 2021-06-01 2021-06-15 2021-07-15 2021-07-29 2021-08-17 2023-02-08 Envelope platform improvement on FX-E02 / Procurement of GIS system, ESB, water hydraulic Component 2: Water supply Under Single Stage - One model development, IBRD / 88370 service management Prior Request for Bids Open - National 0.00 Implementati 2021-06-01 2021-06-15 2021-07-15 2021-07-29 2021-08-17 2023-02-08 Envelope Secondary pressurized water improvement on supply dispatching system FS-E02 / Supply and Component 1: Water supply Pending installation of equipment for Single Stage - One IBRD / 88370 service infrastructure Post Request for Bids Open - International 0.00 Implementati 2021-05-28 2021-06-04 2021-07-16 2021-07-21 2021-08-05 2023-01-27 secondary boosting pumping Envelope improvement on stations (B) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Project Pending AS-FZX01 / Anshan trainings, Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2020-01-06 2020-02-17 2021-08-10 study tours (A) Quotations Envelope institutional strengthening on Component 3: Project Pending AS-FZX02 / Ansahn trainings, Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2021-08-06 2021-09-17 2023-03-11 study tours (B) Quotations Envelope institutional strengthening on Component 3: Project Pending FX-FZX01 / Fuxin training, Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2020-01-06 2020-02-17 2021-08-10 study tour (A) Quotations Envelope institutional strengthening on Component 3: Project Pending FX-FZX02 / Fuxin training, Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2021-08-06 2021-09-17 2023-03-11 study tour (B) Quotations Envelope institutional strengthening on Component 3: Project Pending FS-FZX01 / Fushun training, Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2020-01-06 2020-02-17 2021-08-10 study tour (A) Quotations Envelope institutional strengthening on Component 3: Project Pending FS-FZX02 / Fushun training, Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2021-08-06 2021-09-17 2023-03-11 study tour (B) Quotations Envelope institutional strengthening on Component 3: Project Pending GZ-FZX01 / Gaizhou training, Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2020-01-06 2020-02-17 2021-08-10 study tour (A) Quotations Envelope institutional strengthening on Component 3: Project Pending GZ-FZX02 / Gazhou training, Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2021-08-06 2021-09-17 2023-03-11 study tour (B) Quotations Envelope institutional strengthening on Component 3: Project Pending SY-FZX01 / Shenyang Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2020-01-06 2020-02-17 2021-08-10 training, study tour (A) Quotations Envelope institutional strengthening on Component 3: Project Pending SY-FZX02 / Shenyang Request for Single Stage - One IBRD / 88370 Implementation support and Post Limited 0.00 Implementati 2021-08-06 2021-09-17 2023-03-11 training, study tour (B) Quotations Envelope institutional strengthening on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FX-ZX01 / Construction Component 3: Project Quality And Cost- drawings (detailed) design for IBRD / 88370 Implementation support and Post Open - National 482,359.00 Signed 2018-03-29 2018-03-29 2018-04-08 2018-05-23 2018-05-13 2018-08-07 2018-06-10 2018-09-20 2018-06-25 2018-10-18 2018-07-30 2018-12-14 2018-08-27 2018-12-18 2020-08-26 Based Selection Fuxin City institutional strengthening GZ-ZX01 / Construction Component 3: Project Fixed Budget drawings (detailed) design for / Implementation support and Post Open - National 0.00 Canceled 2018-03-29 2018-04-08 2018-05-13 2018-06-10 2018-06-25 2018-07-30 2018-08-27 2020-08-26 Selection Gaizhou City institutional strengthening Page 4 LN-ZX01 / Project Component 3: Project management consultants Quality And Cost- IBRD / 88370 Implementation support and Prior Open - International 3,543,309.00 Signed 2018-03-29 2018-04-12 2018-04-08 2018-05-28 2018-05-13 2018-08-22 2018-06-10 2018-09-26 2018-06-25 2018-11-08 2018-07-30 2018-12-18 2018-08-27 2018-12-15 2023-08-26 service and IT contracts Based Selection institutional strengthening supervision GZ-ZX01-2 / Construction Component 3: Project Quality And Cost- drawings (detailed) design for IBRD / 88370 Implementation support and Post Open - National 812,289.52 Signed 2018-03-29 2018-04-08 2018-05-10 2018-05-13 2018-08-07 2018-06-10 2018-09-18 2018-06-25 2018-10-18 2018-07-30 2018-12-14 2018-08-27 2018-12-18 2020-08-26 Based Selection Gaizhou Project institutional strengthening LN-ZX02 / Consulting Service of Non-revenue Water Reduction, Energy Conservation, and Component 3: Project Quality And Cost- Performance Management for IBRD / 88370 Implementation support and Post Open - International 881,666.00 Signed 2018-12-25 2019-01-17 2019-01-08 2019-02-21 2019-03-07 2019-03-21 2019-04-12 2019-04-05 2019-04-25 2019-04-19 2019-05-15 2019-05-10 2019-05-28 2023-05-09 Based Selection the Water Supply Companies institutional strengthening (WSCs) of Shenyang, Anshan, Fushun, Fuxin and Gaizhou Cities GZ-ZX02 / Engineering Component 3: Project Quality And Cost- Under supervision for civil works in IBRD / 88370 Implementation support and Post Open - National 0.00 2019-04-10 2019-04-29 2019-04-17 2019-05-06 2019-05-15 2019-06-12 2019-06-12 2019-06-19 2019-07-03 2019-07-24 2022-02-23 Based Selection Implementation Gaizhou city institutional strengthening Component 3: Project SY-ZX01 / Engineering Quality And Cost- IBRD / 88370 Implementation support and Post Open - National 1,542,635.05 Signed 2019-12-23 2020-03-11 2019-12-30 2020-04-16 2020-01-27 2020-05-20 2020-02-24 2020-06-19 2020-03-02 2020-06-29 2020-03-16 2020-07-13 2020-04-06 2020-08-28 2023-04-06 supervision for Civil Works Based Selection institutional strengthening INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, Digital Ethiopia (P171034) Project Implementation agency: Ministry of Finance and Economic Cooperation, Channel One Project Coordination Directorate Date of the Procurement Plan: September 2019 Period covered by this Procurement Plan: from September 2019 to June 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Section 33(1)(a) from 35-48 of the Proclamation Number 649/2009 of the Ethiopian Federal Government Procurement and Property Administration Proclamation such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. • Open Advertising of the procurement opportunity at the national level; • The procurement is open to eligible firms from any country; • The request for bids/Proposal documents shall require that bidders/proposers submitting Bids/Proposal present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the bank’s right to sanction and the Bank’s inspection and audit right; • Contracts with an appropriate allocation of responsibilities, risks and liabilities; • Application of Standstill period and Publication of contract award information; • Maintenance of records of the procurement process; and • The Bank has the right to review procurement documentation and activities. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. PROCUREMENT Ethiopia : Ethiopia Digital Foundations Project PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2021-05-19 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171034 GPN Date: Project Name: Ethiopia Digital Foundations Project Loan / Credit No: IDA / 68560 Ministry of Innovation and Technology Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MINT-234121-CS-INDV / Finance Officer positions for the Ethiopian Communication Authority (ECA) to work under Individual ECA reporting to PIU for 18 Pending IDA / 68560 4. Project management Post Consultant Open 0.00 2021-05-13 2021-07-01 2021-07-22 2021-08-26 2022-11-30 months duration, subject to Implementation Selection renewal based on performance. The estimated budget is for the 18 months. Full time position. ET-MINT-234123-CS-INDV / Finance Officer positions for the Ethiopian Education and Research Network (EthERNet) Individual to work under MoSHE Under IDA / 68560 4. Project management Post Consultant Open 0.00 2021-05-13 2021-05-25 2021-07-01 2021-07-22 2021-08-26 2022-11-30 reporting to PIU for 18 Implementation Selection months duration, subject to renewal based on performance. The estimated budget is for the 18 months. Full time position. ET-MINT-234135-CS-INDV / IT Project Manager positions to work under PIU initially for Individual for 18 months duration, Under IDA / 68560 4. Project management Post Consultant Open 0.00 2021-05-13 2021-05-26 2021-07-01 2021-07-22 2021-08-26 2022-11-30 subject to renewal based on Implementation Selection performance. The estimated budget is for the 18 months. Full time position. ET-MINT-234179-CS-INDV / Contract Management Specialist is to work under the PIU handling the overall Individual project. To be contracted for Under IDA / 68560 4. Project management Prior Consultant Open 0.00 2021-05-13 2021-06-11 2021-07-01 2021-07-22 2021-08-26 2022-11-30 18 months subject to renewal Implementation Selection based on the performance of the consultant. The estimated budget is only for the 18 months. Full time position. Individual ET-MINT-233870-CS-INDV / Under IDA / 68560 4. Project management Prior Consultant Open 0.00 2021-05-25 2021-06-10 2021-06-16 2021-06-23 2021-07-07 2022-11-30 Procurement Specialist Implementation Selection Individual ET-MINT-233864-CS-INDV / Under IDA / 68560 4. Project management Post Consultant Limited 0.00 2021-05-26 2021-05-26 2021-06-05 2021-06-01 2021-06-12 2021-06-14 2021-06-26 2022-11-30 PIU Manager Implementation Selection ET-MINT-234125-CS-INDV / Individual Under Environmental Safeguards IDA / 68560 4. Project management Post Consultant Open 0.00 2021-05-26 2021-05-26 2021-06-17 2021-06-24 2021-07-08 2022-11-30 Implementation Specialist Selection Individual ET-MINT-234131-CS-INDV / Under IDA / 68560 4. Project management Post Consultant Open 0.00 2021-05-26 2021-05-26 2021-06-17 2021-06-24 2021-07-08 2022-11-30 M&E Specialist Implementation Selection ET-MINT-233871-CS-INDV / Individual Under Financial Management IDA / 68560 4. Project management Post Consultant Open 0.00 2021-05-26 2021-05-26 2021-06-17 2021-06-24 2021-07-08 2022-11-30 Implementation Specialist Selection Page 1 Individual ET-MINT-234130-CS-INDV / Under IDA / 68560 4. Project management Post Consultant Open 0.00 2021-05-26 2021-05-26 2021-06-17 2021-06-24 2021-07-08 2022-11-30 Social Safeguards Specialist Implementation Selection ET-MINT-234133-CS-INDV / Finance Officer positions to work under PIU initially for for Individual 18 months duration, subject Under IDA / 68560 4. Project management Post Consultant Open 0.00 2021-05-25 2021-05-26 2021-06-14 2021-06-19 2021-06-29 2022-10-25 to renewal based on Implementation Selection performance. The estimated budget is for the 18 months. Full time position. Page 2 The United Republic of Tanzania Procurement Plan General 1. Project Information Country: United Republic of Tanzania Project Name: Productive Social safety Net Phase II Project ID: P169165 2. Project Implementation Agency: Tanzania Social Action Fund 3. Date of the Procurement Plan: May 2019 4. Period Covered by this procurement plan: Eighteen Months I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. III. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Public Procurement Act, 2011, The Public Procurement (Amendment) Act, 2016 and the Regulations, 2016, such arrangements shall be subject to paragraph 5.3 and 5.4 of the Procurement Regulations and the following conditions: o There should be no mandatory requirements for inclusion of local experts and firms for the consulting assignments; o There should be no exclusive preference based on threshold prescribed in PPA and its Regulations; 1 o Negotiations with the lowest evaluated bidder to reduce price in the case of goods, works and non-consulting services where competitive methods have been used shall not be allowed; o The fixed budget method shall not be used for goods, works and non- consulting services; o Established and approved procurement standards by the government may be used, provided that they are not restrictive When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.4(c) and 5.5 of the Procurement Regulations, the request for bids/request for proposals/request for quotations document shall require that Bidders/Proposers submitting Bids/Proposals/quotations present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. IV. Prequalification: Not Applicable V. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable VI. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable VII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Domestic preference is not applicable for National Open Competitive Procurement VIII. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Not Applicable IX. Other Relevant Procurement Information Not Applicable 2 3 X. Threshold for Prior Review, Procurement Approaches and Methods – Good, Works and Non- Consulting Services Procurement Approaches and Methods (US$ millions) Prior Review Category Open Open National Request for (US$ millions) International Quotation (RfQ) Works ≥5 ≥ 15 < 15 ≤ 0.2 Goods, IT, and non-consulting ≥ 1.5 ≥5 <5 ≤ 0.1 services Post Review: All contracts not subject to prior review shall be subject to post review. 4 XI. Thresholds for Prior Review, Selection Approaches and Methods – Consulting Services Category Prior Review Short List of National Consultants (US$ millions) Consulting Engineering and Construction Supervision Services Consultants (Firms) ≥ 0.5 ≤ 0.3 ≤ 0.3 Individual Consultants ≥ 0.2 n.a. n.a. Note: Consultancy services estimated to cost equivalent to US $ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or regional newspaper. 5 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank- financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub- 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 6 contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 7 Title of the person signing the Letter: 8 PROCUREMENT Tanzania : Tanzania Productive Social Safety Net Project II PLAN General Information Country: Tanzania Bank’s Approval Date of the Original Procurement Plan: 2020-01-31 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169165 GPN Date: 2020-02-03 Project Name: Tanzania Productive Social Safety Net Project II Loan / Credit No: IDA / 64890 T Executing Agency(ies): anzania Social Action Fund WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Institutional TZ-TASAF-161191-GO-RFB / Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 362,423.00 0.00 Canceled 2020-03-20 2020-03-04 2020-03-25 2020-04-25 2020-06-08 2020-05-25 2020-06-29 2023-06-29 Supply ICT Consumables Envelope Delivery Systems TZ-TASAF-161486-GO-RFB / Strengthening Institutional Under Supply Office Equipment Single Stage - One IDA / 64890 Capacity and Integrated Prior Request for Bids Open - National 3,654,500.00 0.00 Implementati 2020-04-10 2021-05-12 2020-04-15 2021-05-31 2020-05-27 2020-06-26 2020-07-31 2021-01-27 (Photocopy machine, Printer Envelope Delivery Systems on and scanners) TZ-TASAF-161495-GO-UN / Strengthening Institutional Pending UN Agencies Supply Motor Vehicles - Phase IDA / 64890 Capacity and Integrated Prior Direct 5,204,564.98 0.00 Implementati 2020-07-17 2020-07-23 2020-08-27 2021-02-23 (Direct) 1 Delivery Systems on TZ-TASAF-161505-GO-UN / Strengthening Institutional Under UN Agencies Supply Motor Vehicles - IDA / 64890 Capacity and Integrated Prior Direct 5,204,564.98 0.00 Implementati 2021-01-13 2021-06-07 2021-01-18 2021-06-08 2021-02-22 2021-08-21 (Direct) Phase II Delivery Systems on Strengthening Institutional Under TZ-TASAF-161506-GO-RFB / Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 661,000.00 0.00 Implementati 2020-05-08 2021-06-04 2020-05-13 2021-06-04 2020-06-12 2020-07-12 2020-08-16 2021-02-12 Supply computers Envelope Delivery Systems on Strengthening Institutional TZ-TASAF-161511-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 67,750.00 25,229.76 Terminated 2020-04-08 2020-06-01 2020-06-03 2020-09-29 2021-06-03 / Supply Sundry Items Quotations Envelope Delivery Systems TZ-TASAF-161515-GO-RFQ Strengthening Institutional Pending Request for Single Stage - One / Supply Office Furniture - IDA / 64890 Capacity and Integrated Post Limited 22,807.00 0.00 Implementati 2020-06-18 2020-08-13 2020-11-11 Quotations Envelope Tables and Chairs Delivery Systems on Strengthening Institutional Pending TZ-TASAF-161713-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 5,263.00 0.00 Implementati 2020-05-06 2020-07-01 2020-09-29 / Supply Office Cabinets Quotations Envelope Delivery Systems on Strengthening Institutional Pending TZ-TASAF-161715-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 4,386.00 0.00 Implementati 2020-05-14 2020-07-09 2020-10-07 / Supply Office Shelves Quotations Envelope Delivery Systems on TZ-TASAF-161193-GO-RFB / Strengthening Institutional Single Stage - One Supply Motor Vehicle Spare IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 716,252.00 912,478.85 Signed 2020-04-13 2020-03-04 2020-04-18 2020-05-18 2020-06-10 2020-06-17 2020-11-25 2020-07-22 2020-12-10 2023-07-22 Envelope Parts Delivery Systems Strengthening Institutional TZ-TASAF-161195-GO-RFB / Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 107,757.00 57,180.49 Terminated 2020-03-10 2020-03-04 2020-03-15 2020-04-14 2020-06-09 2020-05-14 2020-11-25 2020-06-18 2020-12-16 2023-06-18 Supply Office Stationery Envelope Delivery Systems Strengthening Institutional TZ-TASAF-166381-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 59,395.25 42,807.40 Terminated 2020-04-10 2020-06-01 2020-05-22 2020-10-26 2020-08-31 / Supply Network Equipment Quotations Envelope Delivery Systems Strengthening Institutional TZ-TASAF-166384-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 21,598.27 24,170.90 Completed 2020-04-24 2020-06-01 2020-05-29 2020-10-26 2020-09-14 2021-02-03 / Supply Telephone Handsets Quotations Envelope Delivery Systems Strengthening Institutional Under TZ-TASAF-181607-GO-RFB / Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 321,978.26 0.00 Implementati 2020-06-26 2020-06-26 2020-07-01 2020-07-15 2020-07-10 2020-07-29 2020-09-02 2020-12-01 Supply Thermal Scanners Envelope Delivery Systems on TZ-TASAF-181776-GO-DIR / Strengthening Institutional Supply Office Equipment - IDA / 64890 Capacity and Integrated Post Direct Selection Direct 205,217.39 203,535.84 Completed 2020-06-25 2020-06-25 2020-06-30 2020-06-25 2020-08-04 2020-06-29 2021-01-31 2020-07-24 Tablets Delivery Systems TZ-TASAF-223463-GO-RFB / Strengthening Institutional Under Single Stage - One Supply Motor Vehicle Spare IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 716,252.00 912,478.85 Implementati 2020-04-13 2020-03-04 2020-04-18 2020-05-30 2020-06-10 2020-06-29 2020-11-25 2020-08-03 2021-01-30 Envelope Parts Delivery Systems on Strengthening Institutional TZ-TASAF-223462-GO-RFB / Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 107,757.00 53,447.13 Signed 2020-03-10 2020-03-04 2020-03-15 2020-04-26 2020-06-09 2020-05-26 2020-11-25 2020-06-30 2020-12-16 2020-12-27 Supply Office Stationery Envelope Delivery Systems Strengthening Institutional TZ-TASAF-223490-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 67,750.00 25,229.76 Signed 2020-04-08 2020-06-01 2020-06-03 2020-09-29 2020-11-30 / Supply Sundry Items Quotations Envelope Delivery Systems Strengthening Institutional Pending TZ-TASAF-223468-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 59,395.25 0.00 Implementati 2020-04-10 2020-06-05 2020-12-02 / Supply Network Equipment Quotations Envelope Delivery Systems on Strengthening Institutional Under TZ-TASAF-223474-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 21,598.27 0.00 Implementati 2020-04-24 2020-06-01 2020-06-19 2020-12-16 / Supply Telephone Handsets Quotations Envelope Delivery Systems on Page 1 Strengthening Institutional TZ-TASAF-223766-GO-RFB / Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 150,000.00 0.00 Canceled 2021-03-19 2021-03-24 2021-05-05 2021-06-04 2021-07-09 2022-01-05 Supply Software Licenses Envelope Delivery Systems Strengthening Institutional Under TZ-TASAF-232330-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 99,487.60 0.00 Implementati 2021-05-12 2021-05-27 2021-07-07 2022-01-03 / Supply Software Licenses Quotations Envelope Delivery Systems on TZ-TASAF-236198-GO-RFQ Strengthening Institutional Under Request for Single Stage - One / Server for HH Target Mobile IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2021-05-27 2021-05-27 2021-06-25 2021-06-28 Quotations Envelope Application Delivery Systems on Strengthening Institutional Pending TZ-TASAF-235879-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 20,000.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 / Supply Kitchen Appliances Quotations Envelope Delivery Systems on TZ-TASAF-239273-GO-RFQ Strengthening Institutional Pending Request for Single Stage - One / Supply of Computers IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2022-04-09 2022-05-23 2022-11-19 Quotations Envelope (Replacement) Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239274-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2021-09-22 2021-11-24 2022-05-23 / Supply Office Furniture Quotations Envelope Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239277-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 5,263.00 0.00 Implementati 2021-09-22 2021-11-24 2022-05-23 / Supply Office Cabinets Quotations Envelope Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239279-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 4,386.00 0.00 Implementati 2021-09-22 2021-11-24 2022-05-23 / Supply Office Shelves Quotations Envelope Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239285-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2021-09-22 2021-11-24 2022-05-23 / Supply Sundry items Quotations Envelope Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239288-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2021-09-20 2021-11-22 2022-05-21 / Supply Software Licenses Quotations Envelope Delivery Systems on TZ-TASAF-239289-GO-RFQ Strengthening Institutional Pending Request for Single Stage - One / Supply and Installation of IDA / 64890 Capacity and Integrated Post Limited 25,985.28 0.00 Implementati 2021-11-06 2022-01-08 2022-07-07 Quotations Envelope Air Conditioners Delivery Systems on TZ-TASAF-239291-GO-RFQ Strengthening Institutional Pending Request for Single Stage - One / Supply Uniform and Safety IDA / 64890 Capacity and Integrated Post Limited 10,827.20 0.00 Implementati 2021-11-06 2022-01-08 2022-07-07 Quotations Envelope Gears Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239294-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 4,330.88 0.00 Implementati 2021-11-06 2022-01-08 2022-07-07 / Supply Kitchen Appliances Quotations Envelope Delivery Systems on Strengthening Institutional Under TZ-TASAF-239612-GO-RFB / Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 362,423.00 0.00 Implementati 2021-06-21 2021-06-21 2021-06-26 2021-06-21 2021-08-07 2021-09-06 2021-10-11 2023-10-11 Supply ICT Consumables Envelope Delivery Systems on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Institutional TZ-TASAF-161710-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 7,616.00 30,185.40 Terminated 2020-03-17 2020-06-01 2020-05-12 2020-09-29 2021-05-12 / Provide Car Hire Services Quotations Envelope Delivery Systems TZ-TASAF-161875-NC-RFQ Strengthening Institutional Under Request for Single Stage - One / Provide Travel Agent IDA / 64890 Capacity and Integrated Post Limited 17,971.00 0.00 Implementati 2020-04-05 2021-01-25 2020-05-31 2021-05-31 Quotations Envelope Services Delivery Systems on TZ-TASAF-161184-NC-RFB / Strengthening Institutional Print Handbooks, Manuals, Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 453,123.00 948.71 Terminated 2020-05-12 2020-03-04 2020-05-17 2020-06-16 2020-06-11 2020-07-16 2020-11-25 2020-08-20 2021-01-08 2023-08-20 Publicity Materials and Envelope Delivery Systems Reports Strengthening Institutional TZ-TASAF-166344-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 70,000.00 6,237.88 Terminated 2020-04-05 2020-01-27 2020-05-10 2020-02-12 2020-11-06 / Print Publicity Materials Quotations Envelope Delivery Systems TZ-TASAF-166340-NC-RFQ Strengthening Institutional Request for Single Stage - One / Clean TMU offices and IDA / 64890 Capacity and Integrated Post Limited 59,862.00 20,215.08 Signed 2020-05-31 2019-12-16 2020-06-30 2020-01-20 2021-06-30 Quotations Envelope premises Delivery Systems Strengthening Institutional TZ-TASAF-166338-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 70,732.00 56,957.26 Terminated 2020-06-02 2020-06-01 2020-07-30 2020-06-24 2021-07-30 / Provide security services Quotations Envelope Delivery Systems TZ-TASAF-220063-NC-RFQ Strengthening Institutional Under Request for Single Stage - One / Service of Electrical system, IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2021-05-02 2021-06-23 2021-06-27 2022-06-27 Quotations Envelope air Conditioners and Delivery Systems on Generator TZ-TASAF-220389-NC-RFQ Strengthening Institutional Pending Request for Single Stage - One / Fumigate TMU Offices and IDA / 64890 Capacity and Integrated Post Limited 3,000.00 0.00 Implementati 2021-03-30 2021-05-25 2022-05-25 Quotations Envelope Premises Delivery Systems on Strengthening Institutional TZ-TASAF-223472-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 7,616.00 30,191.70 Signed 2020-03-17 2020-06-01 2020-05-12 2020-09-29 2020-11-08 / Provide Car Hire Services Quotations Envelope Delivery Systems Strengthening Institutional Pending TZ-TASAF-223475-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 70,000.00 0.00 Implementati 2020-04-05 2020-05-31 2020-11-27 / Print Publicity Materials Quotations Envelope Delivery Systems on Page 2 TZ-TASAF-223477-NC-RFB / Strengthening Institutional Under Print Handbooks, Manuals, Single Stage - One IDA / 64890 Capacity and Integrated Post Request for Bids Open - National 453,123.00 0.00 Implementati 2020-05-12 2020-03-04 2020-05-17 2020-06-28 2020-06-11 2020-07-28 2020-11-25 2020-09-01 2021-02-28 Publicity Materials and Envelope Delivery Systems on Reports Strengthening Institutional Under TZ-TASAF-223482-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 70,732.00 56,957.26 Implementati 2020-04-05 2020-06-01 2020-05-31 2020-11-27 / Provide security services Quotations Envelope Delivery Systems on Strengthening Institutional Under TZ-TASAF-224437-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 70,732.00 0.00 Implementati 2021-04-02 2021-05-27 2021-05-28 2022-05-28 / Provide Security Services Quotations Envelope Delivery Systems on Strengthening Institutional Under TZ-TASAF-224439-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2021-04-06 2021-05-27 2021-06-01 2022-06-01 / Provide Catering Services Quotations Envelope Delivery Systems on TZ-TASAF-224443-NC-RFQ Strengthening Institutional Under Request for Single Stage - One / Clean TMU Offices and IDA / 64890 Capacity and Integrated Post Limited 59,862.00 0.00 Implementati 2021-03-20 2021-05-10 2021-05-15 2022-05-15 Quotations Envelope Premises Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239295-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 70,732.00 0.00 Implementati 2022-03-06 2022-05-08 2023-05-08 / Provide Security Services Quotations Envelope Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239297-GO-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2022-03-06 2022-05-08 2023-05-08 / Provide Catering Services Quotations Envelope Delivery Systems on TZ-TASAF-239305-NC-RFQ Strengthening Institutional Pending Request for Single Stage - One / Provide Cleaning Services to IDA / 64890 Capacity and Integrated Post Limited 59,862.00 0.00 Implementati 2022-03-06 2022-05-08 2023-05-08 Quotations Envelope TMU Offices and Premises Delivery Systems on TZ-TASAF-239306-NC-RFQ Strengthening Institutional Pending / Service of Electrical system, Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 50,000.00 0.00 Implementati 2022-03-06 2022-05-08 2023-05-08 Air Conditioners and Quotations Envelope Delivery Systems on Generator Strengthening Institutional Pending TZ-TASAF-239308-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 3,000.00 0.00 Implementati 2022-04-09 2022-06-11 2023-06-11 / Service Fire Extinguishers Quotations Envelope Delivery Systems on TZ-TASAF-239309-NC-RFQ Strengthening Institutional Pending Request for Single Stage - One / Fumigate TMU Offices and IDA / 64890 Capacity and Integrated Post Limited 3,000.00 0.00 Implementati 2022-04-09 2022-05-23 2023-05-23 Quotations Envelope Premises Delivery Systems on Strengthening Institutional Pending TZ-TASAF-239311-NC-RFQ Request for Single Stage - One IDA / 64890 Capacity and Integrated Post Limited 40,000.00 0.00 Implementati 2022-04-12 2022-06-14 2023-06-14 / Car Hire Quotations Envelope Delivery Systems on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-TASAF-161818-CS-QCBS Strengthening Institutional Quality And Cost- Pending / Conduct Data Analysis on IDA / 64890 Capacity and Integrated Post Open - International 1,120,000.00 0.00 2020-05-19 2020-06-09 2020-07-23 2020-08-20 2020-09-19 2020-10-24 2020-11-28 2022-11-28 Based Selection Implementation Impact Evaluation Delivery Systems INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Institutional Individual TZ-TASAF-156656-CS-INDV IDA / 64890 Capacity and Integrated Prior Consultant Direct 17,793.75 97,505.75 Signed 2020-01-30 2020-01-31 2020-02-09 2019-12-30 2020-03-01 2020-02-05 2020-04-05 2020-01-01 2020-10-02 / Director of Internal Audit Delivery Systems Selection TZ-TASAF-156658-CS-INDV Strengthening Institutional Individual / Director of Community IDA / 64890 Capacity and Integrated Prior Consultant Direct 17,793.75 97,505.75 Signed 2020-01-30 2020-01-31 2020-02-09 2020-02-03 2020-03-01 2020-02-05 2020-04-05 2020-01-01 2020-10-02 Support Delivery Systems Selection Strengthening Institutional Individual TZ-TASAF-156659-CS-INDV IDA / 64890 Capacity and Integrated Prior Consultant Direct 17,793.75 17,793.75 Signed 2020-01-30 2020-01-31 2020-02-09 2019-12-30 2020-03-01 2020-02-05 2020-04-05 2020-01-01 2020-10-02 / Director of Finance Delivery Systems Selection Strengthening Institutional Individual TZ-TASAF-156664-CS-INDV IDA / 64890 Capacity and Integrated Prior Consultant Direct 16,331.25 273,106.25 Signed 2020-01-30 2020-01-31 2020-02-09 2020-02-03 2020-03-01 2020-02-05 2020-04-05 2020-01-02 2020-10-02 / Procurement Manager Delivery Systems Selection Strengthening Institutional Individual TZ-TASAF-156940-CS-INDV IDA / 64890 Capacity and Integrated Prior Consultant Direct 23,448.75 103,492.81 Signed 2020-01-31 2020-02-03 2020-02-10 2019-03-06 2020-03-02 2020-12-07 2020-04-06 2020-04-01 2020-10-03 / Executive Director Delivery Systems Selection TZ-TASAF-161780-CS-CDS / Strengthening Institutional Consultancy Services for MIS IDA / 64890 Capacity and Integrated Post Direct Selection Direct 150,000.00 104,355.24 Signed 2020-05-19 2020-06-15 2020-05-29 2020-06-18 2020-08-02 2020-09-30 2021-01-29 Support Delivery Systems TZ-TASAF-161803-CS-INDV Strengthening Institutional Individual Under / Consultancy Services to IDA / 64890 Capacity and Integrated Post Consultant Open 100,000.00 0.00 2020-07-27 2020-11-11 2020-09-14 2020-10-05 2020-11-09 2021-05-08 Implementation provide Technical Assistance Delivery Systems Selection Strengthening Institutional Individual TZ-TASAF-161826-CS-INDV Pending IDA / 64890 Capacity and Integrated Prior Consultant Open 443,722.50 0.00 2020-09-17 2020-11-05 2020-11-26 2020-12-31 2023-11-25 / Executive Director Implementation Delivery Systems Selection Strengthening Institutional Individual TZ-TASAF-161835-CS-INDV Under IDA / 64890 Capacity and Integrated Prior Consultant Open 291,817.50 0.00 2020-09-17 2021-01-16 2020-11-05 2020-11-26 2020-12-31 2023-12-31 / Director of Internal Audit Implementation Delivery Systems Selection Page 3 TZ-TASAF-161831-CS-INDV Strengthening Institutional Individual Under / Director of Community IDA / 64890 Capacity and Integrated Prior Consultant Open 291,817.50 0.00 2020-09-17 2021-01-15 2020-11-05 2020-11-26 2020-12-31 2023-12-31 Implementation Support Delivery Systems Selection TZ-TASAF-174854-CS-INDV Strengthening Institutional Individual Under / Director of Finance and IDA / 64890 Capacity and Integrated Prior Consultant Open 250,871.00 0.00 2020-05-24 2020-05-23 2020-07-28 2020-08-18 2020-09-22 2023-11-22 Implementation Administration Delivery Systems Selection Page 4 MINISTRY OF HEALTH Transforming Health Systems for Universal Care Project Project Procurement Plan Financial Year 2016/2017 IDA CREDIT No. 5836-KE GFF Grant Agreement TF0A2561 PHRD Grant Agreement TF0A2792 General 1. Project information: The Government of Kenya has applied for a Credit from the International Development Association supporting the Transforming Health Systems or Universal Care Project 2. Bank’s approval Date of the procurement Plan [Original::] 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 1st June, 2016 to 31st December, 2017 II. Goods and Works and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Method Threshold Prior Review Threshold 1 ICB – Works ≥US$15 million ≥US$10 million 2 NCB- Works 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. No. Description Estimated Package Domestic Review Comments Cost s Preference by Bank US$ (yes/no) (Prior / million Post) FIPAG Summary of the ICB (Works) 22.43 2 No Prior FIPAG Summary of the NCB (Works) 8.90 2 No Post CRA/WASIS II/G 04/17, CRA/WASIS II/G 05/17, Summary of the NCB CRA/WASIS II/G-04/17 & (Goods) 0.295 4 Yes Post CRA/WASIS II/G 06/17 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Estimated Review Ref. No. Description of Assignment Cost Package by Bank Comments US$ million s (Prior / Post) FIPAG Summary of QCBS 9.42 6 Prior QCBS FIPAG Summary ICS 0.38 2 Prior and IND Post CRA/WASIS II/CON 03/17 Summary of QCBS 0.2 1 Prior QCBS CRA/WASIS II/CON 04/17 Summary of CQS 0.5 1 Prior CQS CRA/WASIS II/CON 07/17 CRA/WASIS II/CON 06/17 Summary ICS 0.20 3 Prior ICS CRA/WASIS II/ CON 05/17 PROCUREMENT Mozambique : Water Services & Institutional Support II PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2016-10-18 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149377 GPN Date: Project Name: Water Services & Institutional Support II Loan / Credit No: IDA / 57830, IDA / D1100, IDA / D4910 Water Supply Asset Holding and Investment Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned FIPAG/WASISII/W-2/15 / Design and build for Component 1: Rehabilitation rehabilitation of existing and Expansion of Water Single Stage - One 22,416,000.0 13,747,363. 2019-05- transmission main and IDA / 57830 Prior Request for Bids Open - International Signed 2016-10-17 2016-10-19 2016-10-17 2016-10-27 2016-10-17 2016-12-15 2016-10-17 2017-04-24 2017-04-03 2017-05-22 2017-07-06 2017-10-13 2017-10-31 Supply Production and Envelope 0 87 04 construction of 50 km of Distribution transmission main DN 500 mm, Pemba FIPAG/WASISII/W-9/16 / Design and build of 25km Component 1: Rehabilitation transmission main, DN 350 and Expansion of Water Single Stage - One 10,000,000.0 9,315,309.5 2019-11- mm to connect Moatize to IDA / 57830 Prior Request for Bids Open - International Signed 2017-01-10 2017-01-20 2017-05-29 2017-10-27 2017-07-12 2018-09-04 2017-02-14 2017-04-25 2017-10-09 2018-11-22 2017-11-24 2019-04-09 2018-04-12 2019-05-31 Supply Production and Envelope 0 1 01 Tete system and new pipeline Distribution from Nhartanda to WTP, 1km, DN 500 mm, Tete Component 1: Rehabilitation FIPAG/WASISII/W-7/15 / and Expansion of Water Single Stage - One 6,185,997.9 2018-08- Design and construction of IDA / 57830 Post Request for Bids Open - National 7,763,000.00 Signed 2017-05-08 2017-07-24 2017-05-29 2017-07-24 2017-08-05 2017-10-06 2017-09-19 2017-12-19 2018-02-03 2018-03-14 Supply Production and Envelope 3 25 network, Beira and Dondo Distribution Component 1: Rehabilitation FIPAG/WASISII/W-1/15 / and Expansion of Water Single Stage - One 2018-01- IDA / 57830 Post Request for Bids Open - National 1,134,000.00 722,843.63 Signed 2016-12-05 2017-04-25 2016-12-26 2017-05-10 2017-02-16 2017-07-05 2017-03-20 2017-08-29 2017-06-05 2017-12-13 Drilling Boreholes, Pemba Supply Production and Envelope 02 Distribution Component 1: Rehabilitation FIPAG/WASISII/W-8/18 / and Expansion of Water Single Stage - One 2019-02- IDA / 57830 Post Request for Bids Open - National 1,323,000.00 789,850.46 Signed 2018-04-27 2018-04-13 2018-05-02 2018-04-13 2018-06-15 2018-05-25 2018-07-30 2018-07-10 2018-11-11 2018-09-26 Driling boreholes, Tete Supply Production and Envelope 09 Distribution FIPAG/WASISII/W-12/18 / Component 1: Rehabilitation Design and build for and Expansion of Water Request for Single Stage - One 2,188,687.6 2018-12- rehabilitation of the Mutua IDA / 57830 Post Limited 1,500,000.00 Signed 2018-05-02 2018-10-16 2018-06-27 2019-01-29 Supply Production and Quotations Envelope 6 24 pumping station, Beira Distribution (emergency) FIPAG/WASISII/W-3/19 / Electromechanical equipment Component 1: Rehabilitation of boreholes, rehabilitation and Expansion of Water Single Stage - One 19,600,000.0 13,724,398. 2021-10- IDA / 57830 Prior Request for Bids Open - International Signed 2019-10-31 2020-04-23 2019-11-15 2020-05-05 2020-02-13 2020-07-15 2020-05-13 2020-09-23 2020-07-18 2020-12-07 and construction of Water Supply Production and Envelope 0 50 11 Treatment Plant and Pumping Distribution Station in Pemba FIPAG/WASISII/W-5/19 / Refurbishment of existing Component 1: Rehabilitation Under treatment system, including and Expansion of Water Single Stage - One 18,100,000.0 2022-08- IDA / 57830 Prior Request for Bids Open - International 0.00 Implementat 2019-11-20 2020-12-06 2019-12-05 2020-12-21 2020-03-04 2021-02-16 2020-06-02 2020-08-31 pre-treatment canal, and Supply Production and Envelope 0 31 ion rehabilitation of the Dingue Distribution Dingue water intake in Beira FIPAG/WASISII/W-4/19 / Component 1: Rehabilitation Rehabilitation and and Expansion of Water Single Stage - One 10,793,000.0 9,173,096.4 2022-07- IDA / 57830 Prior Request for Bids Open - International Signed 2020-03-27 2020-07-17 2020-04-11 2020-07-24 2020-07-10 2020-09-22 2020-10-08 2021-01-26 2021-03-07 2021-04-01 construction of distribution Supply Production and Envelope 0 0 30 centres and network in Pemba Distribution FIPAG/DRIVE/W-1/19 / Design, rehabilitation and Component 1: Rehabilitation construction of intake, water and Expansion of Water Single Stage - One 25,050,000.0 2022-08- IDA / D4910 Prior Request for Bids Open - International 0.00 Canceled 2020-06-18 2020-07-03 2020-09-01 2020-11-30 2021-02-13 treatment, transmission main Supply Production and Envelope 0 07 and pumping stations in Distribution Nacala FIPAG/DRIVE/W-2/19 / Component 1: Rehabilitation Design, Rehabilitation and and Expansion of Water Single Stage - One 17,550,000.0 2022-10- Construction of Distribution IDA / D4910 Prior Request for Bids Open - International 0.00 Canceled 2020-07-30 2020-08-14 2020-10-13 2021-01-11 2021-04-26 Supply Production and Envelope 0 18 Centers and Network in Distribution Nacala FIPAG/WASISII/EMERGENCY/W- 13/20 / Borehole equipment Component 4: Contingent Single Stage - One 2021-03- IDA / 57830 Post Request for Bids Open - International 835,000.00 0.00 Canceled 2020-05-28 2020-06-02 2020-07-14 2020-08-13 2020-09-17 and construction of Emergency Response Envelope 16 transmission mains in Moatize Component 1: Rehabilitation FIPAG/WASISII/EMERGENCY/W- and Expansion of Water Single Stage - One 2021-03- 7A/20 / Rehabilitation of IDA / 57830 Post Request for Bids Open - National 837,885.00 0.00 Canceled 2020-05-13 2020-05-18 2020-06-29 2020-07-29 2020-09-02 Supply Production and Envelope 01 network in Beira and Dondo Distribution GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FIPAG/IGP/G-2/17 / Supply Component 2: Institutional Request for Single Stage - One IDA / D1100 Post Limited 65,000.00 82,081.84 Signed 2017-08-27 2017-09-26 2017-11-23 2018-01-30 2017-12-23 of IT equipment Support Quotations Envelope FIPAG/IGP/G-1/17 / Supply Component 2: Institutional Request for Single Stage - One IDA / D1100 Post Limited 35,000.00 46,398.49 Signed 2018-04-09 2018-06-04 2018-07-06 2019-04-15 2018-08-05 of office furniture Support Quotations Envelope Page 1 FIPAG/WASISII/G-3/18 / Component 2: Institutional Request for Single Stage - One Purchase of motorcycles for IDA / D1100 Post Limited 65,000.00 0.00 Canceled 2018-11-05 2019-02-26 2019-08-25 Support Quotations Envelope Tete and Moatize FIPAG/EMERGENCY/G-5/19 / Supply of sand for SSFs in Component 4: Contingent Request for Single Stage - One IDA / 57830 Post Limited 136,750.00 654,353.83 Signed 2019-10-22 2019-09-09 2019-12-17 2019-11-29 2020-06-14 Beira, Quelimane, Manica and Emergency Response Quotations Envelope Nampula FIPAG/EMERGENCY/G-2/19 / Under Supply of electrical and Component 4: Contingent Request for Single Stage - One IDA / 57830 Post Limited 1,237,110.00 0.00 Implementati 2019-10-19 2019-08-26 2019-12-22 2020-06-19 mechanical equipament for Emergency Response Quotations Envelope on Beira and Dondo, Manica, FIPAG/EMERGENCY/G-4/19 / Supply of Chemicals (HTH, Component 4: Contingent Request for Single Stage - One IDA / 57830 Post Limited 310,000.00 276,357.72 Signed 2020-03-13 2019-07-22 2020-05-08 2019-10-12 2020-11-04 Alluminium Sulphate and Emergency Response Quotations Envelope Lime) for Beira FIPAG/EMERGENCY/G-1/19 / Supply of Pipes and Fittings Component 4: Contingent Request for Single Stage - One IDA / 57830 Post Limited 1,006,820.00 259,651.56 Signed 2019-10-08 2019-08-15 2019-12-03 2019-11-13 2020-05-31 for Beira, Dondo, Manica, Emergency Response Quotations Envelope Tete, Moatize, Nampula and Mocuba FIPAG/WASISII/EMERGENCY/G- 6/20 / Supply of electrical and mechanical equipament Under Component 4: Contingent Request for Single Stage - One for Beira, Dondo, Manica, IDA / 57830 Post Limited 1,230,000.00 0.00 Implementati 2020-05-23 2020-07-18 2021-01-14 Emergency Response Quotations Envelope Chimoio, Gondola, Tete and on Moatize and Supply of pipes and fittings FIPAG/WASISII/EMERGENCY/G- 8/20 / Supply of Chemicals Component 4: Contingent Request for Single Stage - One IDA / 57830 Post Limited 1,510,000.00 1,246,974.16 Signed 2020-05-17 2020-05-27 2020-07-12 2020-08-28 2021-01-08 (HTH, Alluminium Sulphate Emergency Response Quotations Envelope and Lime) for Beira FIPAG/WASISII/EMERGENCY/G- Pending Component 4: Contingent 10/20 / Supply of Electricity IDA / 57830 Post Direct Selection Direct 550,967.74 0.00 Implementati 2020-05-12 2020-05-17 2020-06-21 2020-12-18 Emergency Response to Beira by EDM on FIPAG/WASISII/EMERGENCY/G- 9/20 / Supply of Sand to Component 4: Contingent Request for Single Stage - One IDA / 57830 Post Limited 636,707.00 528,158.71 Signed 2020-05-25 2020-05-27 2020-07-20 2020-08-28 2021-01-16 Beira, Quelimane, Manica and Emergency Response Quotations Envelope Nampula FIPAG/WAISIS II/G-15/20 / Pending Supply of equipment and Component 2: Institutional Single Stage - One IDA / D1100 Post Request for Bids Open - National 300,000.00 0.00 Implementati 2020-09-21 2020-10-06 2020-12-05 2021-02-03 2021-05-04 2021-12-30 goods for Nacala dam safety Support Envelope on management FIPAG/WASIS II/G-04/20 / Component 1: Rehabilitation Supply of water meters & Under and Expansion of Water Single Stage - One fittings for connections for IDA / 57830 Prior Request for Bids Open - International 2,650,000.00 0.00 Implementati 2020-12-01 2021-02-12 2020-12-06 2021-02-17 2021-01-17 2021-04-30 2021-02-16 2021-03-23 2021-09-19 Supply Production and Envelope Pemba, Nacala, Tete, Moatize, on Distribution Beira and Dondo Component 1: Rehabilitation FIPAG/WASISII/G-6/21 / Pending and Expansion of Water Single Stage - One Upgrade of Regional IDA / 57830 Post Request for Bids Open - International 315,000.00 0.00 Implementati 2021-04-30 2021-05-05 2021-06-16 2021-07-16 2021-08-20 2022-02-16 Supply Production and Envelope Laboratories on Distribution Component 1: Rehabilitation FIPAG/WASISII/G-7/21 / Pending and Expansion of Water Single Stage - One Asset Management: Software, IDA / 57830 Post Request for Bids Limited 350,000.00 0.00 Implementati 2021-06-24 2021-06-29 2021-08-10 2021-09-09 2021-10-14 2022-04-12 Supply Production and Envelope Materials and Equipment on Distribution NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FIPAG/WASISII/CON-3/17 / Component 2: Institutional Request for Single Stage - One Documents Translation IDA / D1100 Post Limited 150,000.00 64,350.68 Signed 2017-08-19 2017-08-23 2017-10-23 2017-10-30 2019-10-23 Support Quotations Envelope Services FIPAG/WASISII/CON-26/18 / Component 2: Institutional Request for Single Stage - One IDA / D1100 Post Open - National 150,000.00 72,247.06 Signed 2018-10-20 2018-12-17 2018-12-14 2020-12-23 Document translation services Support Quotations Envelope FIPAG/WASISII/CON-39/20 / Dam Safety Technical Pending Assistance Service Provider for Component 2: Institutional IDA / D1100 Post Direct Selection Direct 120,000.00 0.00 Implementati 2020-11-16 2020-12-16 2021-04-15 2023-04-15 ARA-Norte - Portuguese Support on Laboratory of Civil Engineering (LNEC) FIPAG/WASIS II/CON-36/20 / Implementation of COVID-19 Under Component 2: Institutional mitigation measures in the IDA / D1100 Post Direct Selection Direct 624,774.00 0.00 Implementati 2020-09-14 2020-09-14 2020-09-19 2020-12-01 2022-12-01 Support PHC commercial management on system by 2-Business Under FIPAG/WASISII/G-5/21 / Component 2: Institutional Request for Single Stage - One IDA / D1100 Post Limited 80,000.00 0.00 Implementati 2021-04-13 2021-05-06 2021-06-08 2021-12-05 Document translation services Support Quotations Envelope on FIPAG/WASISII/ G-8/21 / Pending Component 2: Institutional Request for Single Stage - One Communication and Logistics IDA / D1100 Post Limited 150,000.00 0.00 Implementati 2021-06-02 2021-07-28 2022-01-24 Support Quotations Envelope for Financiers Conference on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 FIPAG/WASISII/CON-6/15 / Design check and supervision Component 2: Institutional Quality And Cost- of rehabilitation and IDA / D1100 Prior Open - International 1,215,000.00 665,133.53 Signed 2016-10-17 2016-10-19 2016-10-17 2016-12-12 2016-10-26 2017-02-27 2017-01-26 2017-04-03 2017-04-19 2017-08-29 2017-08-23 2017-11-03 2017-10-31 2020-11-16 Support Based Selection construction of transmission mains, Pemba FIPAG/WASISII/CON-7/15 / Design and supervision of electromechanical equipment Component 2: Institutional Quality And Cost- of boreholes, rehabilitation IDA / D1100 Prior Open - International 2,300,000.00 798,480.34 Signed 2016-10-17 2016-10-19 2016-10-17 2016-12-22 2016-11-08 2017-03-06 2017-01-10 2017-04-09 2017-03-24 2017-09-20 2017-08-01 2018-01-09 2018-03-13 2021-02-21 Support Based Selection and construction of treatment plant and pumping stations, Pemba FIPAG/WASISII/CON-9/15 / Design and Supervision for refurbishment of existing Component 2: Institutional Quality And Cost- treatment system, including IDA / D1100 Prior Open - International 1,500,000.00 786,012.94 Signed 2016-10-17 2016-10-19 2016-10-17 2017-01-03 2016-12-18 2017-03-17 2017-03-24 2017-06-09 2017-05-31 2017-10-06 2018-01-04 2017-12-11 2018-06-07 2021-02-26 Support Based Selection pre-treatment canal & rehabilitation of the Dingue Dingue Water Intake, Beira FIPAG/WASISII/CON-8/16 / Design and supervision for Component 2: Institutional Quality And Cost- Rehabilitation and IDA / D1100 Prior Open - International 1,900,000.00 1,356,578.66 Signed 2016-10-17 2016-10-19 2016-10-17 2016-12-22 2016-12-21 2017-03-10 2017-03-09 2017-04-13 2017-05-03 2017-09-26 2017-12-05 2018-01-15 2018-03-16 2021-09-28 Support Based Selection Construction of Distribution Centre and Network, Pemba FIPAG/WASISII/CON-11/15 / Component 2: Institutional Quality And Cost- Design check and supervision IDA / D1100 Prior Open - International 1,500,000.00 696,788.00 Signed 2016-11-10 2016-12-15 2017-02-03 2016-12-21 2017-04-05 2017-05-10 2017-06-21 2017-07-26 2017-12-04 2017-12-06 2018-05-14 2018-02-12 2018-07-05 2020-09-02 Support Based Selection of network, Beira and Dondo FIPAG/WASISII/CON-14/16 / Design check and supervision Component 2: Institutional Quality And Cost- of rehabilitation and IDA / D1100 Prior Open - International 1,000,000.00 599,575.00 Signed 2017-01-05 2017-05-22 2017-02-27 2017-07-26 2017-05-31 2018-10-15 2017-08-16 2018-12-04 2017-09-20 2019-04-09 2018-01-31 2019-07-19 2018-04-09 2019-10-07 2020-11-30 Support Based Selection construction of transmission mains, Tete FIPAG/WASISII/CON-15/18 / Design and supervision of electro-mechanical equipment Component 2: Institutional Quality And Cost- of boreholes, rehabilitation IDA / D1100 Prior Open - International 3,000,000.00 2,017,083.27 Signed 2018-05-21 2018-10-10 2018-07-05 2018-10-16 2018-08-18 2019-07-29 2018-09-22 2019-09-24 2018-10-22 2020-05-14 2018-12-05 2020-10-29 2019-03-19 2020-12-22 2021-09-04 Support Based Selection and construction of treatment plant and pumping stations, Tete FIPAG/WASISII/CON-16/18 / Design and Supervision for rehabilitation and Component 2: Institutional Quality And Cost- IDA / D1100 Prior Open - International 2,100,000.00 872,120.31 Signed 2018-05-11 2018-07-17 2018-06-01 2018-07-19 2018-07-15 2019-07-30 2018-08-20 2019-09-26 2018-09-19 2019-12-23 2018-11-02 2020-04-01 2019-02-14 2020-08-10 2021-08-02 construction of distribution Support Based Selection centres and network, Tete and Moatize FIPAG/WASISII/CON-13A/18 Consultant Component 2: Institutional / Supervision for drilling IDA / D1100 Post Qualification Open - National 110,000.00 91,401.88 Signed 2018-09-21 2018-07-24 2018-09-28 2018-11-11 2018-11-05 2018-11-25 2019-01-29 2018-12-16 2019-02-08 2019-05-15 Support boreholes in Tete Selection FIPAG/WASISII/CON-24/18 / Design and supervision of Component 2: Institutional Quality And Cost- IDA / D1100 Prior Open - International 1,000,000.00 1,301,234.04 Signed 2018-11-30 2019-12-20 2018-12-14 2020-01-03 2019-04-13 2020-05-31 2019-06-27 2020-08-12 2019-08-11 2020-10-28 2019-10-09 2021-01-21 2019-12-22 2021-03-26 2021-07-12 construction of distribution Support Based Selection center in Beira FIPAG/WASISII/CON-19/18 / Development of information and communication Component 2: Institutional Quality And Cost- Under technology master plan and IDA / D1100 Post Open - International 650,000.00 0.00 2018-10-28 2018-11-14 2018-12-09 2018-12-17 2019-01-22 2020-06-04 2019-02-19 2019-03-21 2019-04-25 2019-05-30 2020-05-29 Support Based Selection Implementation assistance in the identification of application management solutions FIPAG/WASISII/CON-23A/18- 2 / Design check and Consultant Component 2: Institutional supervision of construction of IDA / D1100 Post Qualification Open - National 200,000.00 291,710.00 Signed 2018-11-30 2018-12-06 2018-12-30 2019-04-11 2019-02-27 2019-11-05 2019-03-29 2019-12-30 2019-05-03 2020-01-27 2019-12-29 Support Mutua emergency pumping Selection station, Beira FIPAG/DRIVE/CON-1/19 / Design check and supervision Component 2: Institutional Quality And Cost- Under of rehabilitation and IDA / D4910 Prior Open - International 2,500,000.00 0.00 2020-04-05 2020-05-13 2020-05-05 2020-05-16 2020-10-17 2021-01-15 2021-03-16 2021-06-14 2021-12-11 2024-05-29 Support Based Selection Implementation expansion of Nacala water supply system FIPAG/WASISII/CON-27/20 / Component 2: Institutional Least Cost Under Financial Audit for 2020, IDA / D1100 Post Open 450,000.00 0.00 2020-03-12 2021-01-18 2020-04-02 2020-11-05 2020-05-16 2021-02-05 2020-06-13 2021-03-04 2020-07-13 2021-04-15 2020-08-17 2021-05-03 2020-09-21 2021-03-20 Support Selection Implementation 2021 and 2022 FIPAG/WASISII/CON-34/20 / Component 2: Institutional Quality And Cost- Pending Feasibility Study and Detailed IDA / D1100 Prior Open - International 600,000.00 0.00 2020-08-30 2020-10-14 2021-02-11 2021-05-12 2021-07-11 2021-10-09 2022-01-28 2022-11-24 Support Based Selection Implementation Design for Nampula FIPAG/WASISII/CON-33/20 / Component 2: Institutional Quality And Cost- Under Preparation of Master Plan for IDA / D1100 Prior Open - International 1,500,000.00 0.00 2020-11-16 2021-05-03 2020-12-31 2021-05-21 2021-04-30 2021-07-29 2021-09-27 2021-12-26 2022-04-16 2023-04-16 Support Based Selection Implementation Pemba and Nacala FIPAG/WASISII/CON-31/20 / Consultant Preparation of Project Component 2: Institutional Under IDA / D1100 Post Qualification Open - National 250,000.00 0.00 2020-09-04 2020-09-28 2020-09-25 2020-11-06 2020-12-24 2021-01-23 2021-04-08 2022-03-10 Management Platform for Support Implementation Selection FIPAG FIPAG/WASISII/CON-25/18 / Component 2: Institutional Quality And Cost- Groundwater management IDA / D1100 Post Open - International 500,000.00 0.00 Canceled 2018-12-12 2019-01-02 2019-04-02 2019-06-16 2019-07-31 2019-09-13 2019-11-26 2021-06-18 Support Based Selection plan for Tete and Pemba FIPAG/WASISII/CON-12/15 / Component 3: Output-Based Consultant Independent monitoring IDA / D1100 Payments for Low-Income- Post Qualification Open - National 300,000.00 0.00 Canceled 2018-07-26 2018-09-15 2018-12-19 2019-06-08 2019-08-13 2025-09-09 verification agent for Maputo Household Connections Selection FIPAG/WASISII/CON-43/21 / Developing Innovative Fit-for- Consultant Component 2: Institutional Pending Purpose Public Private IDA / D1100 Post Qualification Open - International 300,000.00 0.00 2021-04-19 2021-05-10 2021-06-23 2021-07-23 2021-08-27 2022-02-23 Support Implementation Partnerships for Four Regional Selection Water Utilities Page 3 FIPAG/WASISII/CON-44/21 / Technical Assistance to Component 2: Institutional Quality And Cost- Pending IDA / D1100 Post Open - International 500,000.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-29 2021-09-28 2021-11-02 2021-12-07 2022-12-07 Maputo Metropolitan Water Support Based Selection Implementation Utility FIPAG/WASISII/CON-45/21 / Technical Assistance to Component 2: Institutional Quality And Cost- Pending IDA / D1100 Post Open - International 400,000.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-29 2021-09-28 2021-11-02 2021-12-07 2022-12-07 Southern Regional Water Support Based Selection Implementation Utilily FIPAG/WASISII/CON-46/21 / Component 2: Institutional Quality And Cost- Pending Technical Assistance to IDA / D1100 Post Open - International 450,000.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-29 2021-09-28 2021-11-02 2021-12-07 2022-12-07 Support Based Selection Implementation Central Regional Water Utilily FIPAG/WASISII/CON-47/21 / Technical Assistance to Component 2: Institutional Quality And Cost- Pending IDA / D1100 Post Open - International 400,000.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-29 2021-09-28 2021-11-02 2021-12-07 2022-12-07 Northern Regional Water Support Based Selection Implementation Utitily FIPAG/WASISII/CON-48/21 / Consultant Consultancy for the Refining Component 2: Institutional Pending IDA / D1100 Post Qualification Open - International 150,000.00 0.00 2021-04-30 2021-05-21 2021-07-04 2021-08-03 2021-09-07 2022-03-06 and Implementation of Asset Support Implementation Selection Management strategy FIPAG/WASISII/CON-41/21 / Consultancy services for Consultant preparation and installation Component 2: Institutional Under IDA / D1100 Post Qualification Open - International 40,000.00 0.00 2021-06-10 2021-07-01 2021-08-14 2021-09-13 2021-10-18 2022-04-16 the platform for manage the Support Implementation Selection Grievance Redress Mechanism (GRM) FIPAG/WASISII/CON-42/21 / Leagal advisory services for Consultant establishment of Regional Component 2: Institutional Pending IDA / D1100 Prior Qualification Open - National 120,000.00 0.00 2021-05-30 2021-06-20 2021-08-03 2021-09-02 2021-10-07 2022-04-05 Companies, and legal Support Implementation Selection assistance for PPP Studies up until the transactions FIPAG/WASISII/CON-49/21 / Consultant Component 2: Institutional Pending Utility Regional Office Project IDA / D1100 Post Qualification Open - National 150,000.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Support Implementation Design and supervision Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FIPAG/WASISII/CON-5/15 / Individual Component 2: Institutional Supervision for construction IDA / D1100 Post Consultant Open 80,000.00 51,420.00 Signed 2017-01-16 2017-05-17 2017-04-24 2017-08-02 2017-06-12 2017-12-06 2017-08-02 2018-01-19 2019-02-26 Support of boreholes in Pemba Selection FIPAG/WASISII/CON-2/17 / Individual Component 2: Institutional Planning and Investment IDA / D1100 Prior Consultant Open 400,000.00 549,000.00 Signed 2017-08-10 2017-09-13 2017-09-22 2018-01-09 2017-10-07 2018-02-21 2017-12-10 2018-04-12 2019-12-10 Support Advisor Selection Individual FIPAG/WASISII/CON-1/17 / Component 2: Institutional IDA / D1100 Prior Consultant Open 400,000.00 788,400.00 Signed 2017-08-11 2017-08-22 2017-10-14 2018-01-23 2017-11-04 2018-02-21 2018-01-07 2018-05-10 2020-01-07 Procurement Advisor Support Selection Individual FIPAG/WASISII/CON-4/18 / Component 2: Institutional IDA / D1100 Prior Consultant Open 300,000.00 0.00 Canceled 2018-06-08 2018-07-27 2018-08-17 2018-11-06 2020-06-01 Electromechanical advisor Support Selection Individual FIPAG/WASISII/CON-17/18 / Component 2: Institutional IDA / D1100 Prior Consultant Open 400,000.00 268,032.00 Signed 2018-05-31 2019-12-12 2018-08-03 2020-03-13 2018-09-06 2020-04-22 2018-12-19 2020-05-22 2020-12-18 Contract management advisor Support Selection FIPAG/WASISII/CON-21/18 / Individual Component 2: Institutional Dam safety inspection IDA / D1100 Post Consultant Limited 50,000.00 37,830.00 Signed 2018-04-02 2018-05-02 2018-04-09 2018-06-05 2018-04-30 2018-11-13 2018-07-23 2018-11-29 2018-08-22 Support services Selection FIPAG/WASISII/CON-4/17 / Individual Update of FIPAG generic Component 2: Institutional IDA / D1100 Post Consultant Open 100,000.00 0.00 Canceled 2018-04-18 2018-06-23 2018-07-25 2018-10-01 2019-03-30 Environmental Management Support Selection Plan FIPAG/WASISII/CON-10/18 / Individual Component 2: Institutional Under Water treatment process IDA / D1100 Post Consultant Open 150,000.00 0.00 2018-06-15 2021-03-12 2018-08-03 2018-08-31 2018-11-13 2020-06-08 Support Implementation specialist Selection Individual FIPAG/WASISII/CON-22/18 / Component 2: Institutional IDA / D1100 Post Consultant Direct 50,000.00 40,775.00 Signed 2018-04-06 2018-05-18 2018-04-16 2018-06-07 2018-05-07 2018-07-06 2018-06-11 2018-07-31 2018-12-08 Update of the RPF Support Selection Individual FIPAG/WASISII/CON-20/18 / Component 2: Institutional IDA / D1100 Post Consultant Direct 70,000.00 50,373.75 Signed 2018-04-09 2018-05-28 2018-04-19 2018-07-16 2018-05-10 2018-08-17 2018-07-23 2018-08-31 2018-09-06 Update of the ESMF Support Selection FIPAG/WASISII/CON-23/18 / Individual Design check and supervision Component 2: Institutional IDA / D1100 Post Consultant Open 150,000.00 0.00 Canceled 2018-05-10 2018-06-28 2018-07-28 2018-08-24 2019-04-21 of rehabilitation of Mutua Support Selection pumping station (emergency) FIPAG/WASISII/CON-19/15 / Individual Acquisition of commercial Component 2: Institutional Pending IDA / D1100 Post Consultant Open 300,000.00 0.00 2018-09-15 2019-02-10 2019-04-13 2019-06-19 2021-07-16 software and technical Support Implementation Selection assistance FIPAG/WASISII/CON-13/18 / Individual Component 2: Institutional Supervision for construction IDA / D1100 Post Consultant Open 80,000.00 0.00 Canceled 2018-05-30 2018-07-24 2018-07-18 2018-08-21 2018-12-03 2019-03-03 Support of boreholes in Tete Selection FIPAG/WASISII/CON-27/19 / Component 2: Institutional Review and update of ESIA for IDA / D1100 Post Direct Selection Direct 60,000.00 55,656.00 Signed 2019-05-31 2019-06-20 2019-06-12 2019-09-09 2019-07-29 2020-03-07 Support Nacala Page 4 Individual FIPAG/WASISII/CON-29/20 / Component 2: Institutional Under IDA / D1100 Post Consultant Limited 200,000.00 0.00 2020-07-08 2020-07-31 2020-07-13 2020-08-03 2020-09-07 2021-03-06 Institutional Advisor Support Implementation Selection FIPAG/WASIS II/CON-30/20 / Individual Component 2: Institutional Monitoring and Evaluation IDA / D1100 Post Consultant Open 250,000.00 173,484.00 Signed 2020-07-15 2020-11-05 2020-09-02 2021-04-20 2020-09-23 2021-05-07 2020-10-28 2021-05-20 2021-04-26 Support Specialist services Selection FIPAG/WASISII/CON-32/20 / Individual Component 2: Institutional Under Planning and Investment IDA / D1100 Prior Consultant Open 400,000.00 0.00 2020-08-17 2020-11-03 2020-10-16 2021-04-14 2020-10-31 2021-06-10 2021-01-04 2023-01-04 Support Implementation Advisor Selection Individual FIPAG/WASISII/W-38/20 / Component 2: Institutional IDA / D1100 Post Consultant Open 200,000.00 299,800.00 Signed 2020-08-17 2020-08-13 2020-11-29 2021-01-07 2020-12-29 2021-01-29 2021-03-14 2021-03-02 2023-03-14 Hydro-mechanical Advisor Support Selection FIPAG/WASISII/CON-37/20 / Individual Component 2: Institutional Dam safety inspection IDA / D1100 Post Consultant Direct 60,000.00 141,493.75 Signed 2020-09-08 2020-10-22 2020-09-18 2020-12-03 2020-10-09 2021-02-26 2021-01-22 2021-03-29 2021-07-21 Support services Selection FIPAG/WASIS II/CON-35/20 / Individual Component 2: Institutional Under Groundwater management IDA / D1100 Post Consultant Open 200,000.00 0.00 2020-08-31 2020-12-02 2020-11-13 2020-12-13 2021-02-26 2023-02-26 Support Implementation Specialist for Tete and Selection Moatize FIPAG/WASIS II/CON 40/20 / Component 1: Rehabilitation Preparation and Individual and Expansion of Water Under Implementation of the IDA / D1100 Post Consultant Open 200,000.00 0.00 2020-11-06 2021-02-17 2020-12-25 2021-01-15 2021-02-19 2021-08-18 Supply Production and Implementation Abbreviated Resettlement Selection Distribution Action Plan (ARAP) in Pemba FIPAG/WASISII/CON-50/21 / Component 1: Rehabilitation Individual Mapping of services for and Expansion of Water Pending IDA / D1100 Post Consultant Open 75,000.00 0.00 2021-05-30 2021-08-28 2021-09-18 2021-10-12 2022-04-10 survivors of GBV /SEA for Supply Production and Implementation Selection WASIS II project Distribution Individual FIPAG/WASISII/CON-51/21 / Component 2: Institutional Under IDA / D1100 Prior Consultant Open 350,000.00 0.00 2021-05-26 2021-06-07 2021-07-14 2021-08-04 2021-09-08 2022-03-07 Contract Management Advisor Support Implementation Selection Page 5 PLAN DE PASSATION DE MARCHÉS Information sur le Projet : Emprunteur/Bénéficiaire République Togolaise Ministère Responsable Ministère de l’Économie et des Finances Nom du Projet Projet d’Appui à la Gouvernance Économique Identification P158078 Agence d’exécution du Projet : SP-PRPF / Unité de Coordination du Projet (UCP) Date du plan de passation des marchés : Période couverte par ce plan de passation des marchés : Septembre 2017 à Décembre 2018 Date d’approbation par la Banque du plan de passation de marchés : [A indiquer] Date de publication de l’Avis Général de Passation des Marchés : 17 août 2017 Evaluation de risque par P-RAMS (Procurement Risk Assessment and Management System) : Elevé Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans la loi No. 2009-013 du 30 juin 2009 relative aux Marchés Publics et Délégation de Service Public, le Décret Nº 2009-277/PR du 11 novembre 2009 portant Code des Marchés Publics et Délégation de Service Public, et les textes d’application y afférents, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : - Le dossier d’appel d’offres/à propositions oblige le Soumissionnaire/les proposants présentant une Offre/Proposition à déposer un agrément signé, qui sera joint à tout contrat éventuel, pour confirmer qu’il applique et respecte les Directives de la Banque pour la lutte contre la corruption, y compris sans limitation, le droit de la Banque de sanctionner et les droits de la Banque pour l’inspection e l’audit ; - Le droit de la Banque d’examiner le dossier et les activités de passation des marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas pour les contrats indiqués dans les tableaux du Plan de passation des marchés Travaux ne s’applique pas pour les contrats indiqués dans les tableaux du Plan de passation des marchés L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés ne s’applique pas. Autres informations pertinentes sur la passation des marchés : Pour la mise en œuvre du projet, il a été convenu que les activités de la passation des marchés du projet seront coordonnées et exécutées par une Unité de Coordination de Projet (UCP) qui sera mise en place au sein du Secrétariat Permanent pour le Suivi des Politiques de Réformes et des Programmes Financiers (SP-PRPF) sis au Ministère de l’Economie et des Finances. Pour les activités de l’Office Togolais des Recettes (OTR) pour lesquelles les décaissements seront effectués sur la base des indicateurs de résultats convenus, l’OTR avant le démarrage desdits activités élaborera et fera soumettre pour validation préalable à la Banque mondiale un plan de passation de marchés incluant tous les marchés issus des activités qui participent à l’atteinte de ces indicateurs. En outre, lesdits marchés seront régis par les dispositions du Règlement de Passation des Marchés. I. TRAVAUX, FOURNITURES ET SERVICES AUTRES QUE LES SERVICES DE CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable : Seuils requis pour les décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans les paragraphes 3.5 à 3.8 de la Section III, et de l’Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI), en date de Juillet 2016. Catégories de marchés Montants Observations estimatifs des contrats en millions de dollars américains Travaux (incluant clé à main, Fourniture et Installation, et les >= 5 Partenariat Public - Privé -PPP) Biens, Système d’Information et de Services autres que les >= 1,5 Services intellectuels Contrats à Travaux passer par (incluant clé à >= 5 entente main, directe Fourniture et Les justifications de Installation, et l’entente directe les Partenariat devront être jointes et Public - Privé - approuvées avec PPM PPP) Biens, Système d’Information et de Services >= 1,5 autres que les Services intellectuels 2. Seuils pour les méthodes de passation des marchés : Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES ET SERVICES AUTRE QUE LES SERVICES DE CONSULTANTS TRAVAUX (US$ équivalent) (US$ équivalent) AOI AON DC AOI AON DC < < 100.000 ≥5.000.000 <5.000.000 200.00 ≥500.000 <500.000 0 3. Dispositions spéciales sur les marchés : Concernant les acquisitions de véhicules, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur d’USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque). Liste de Marchés de Travaux, Fournitures, et Services autres que Consultant Méthode/ Type Modalité Date de Montant d'Exam Approch Commentaire Réf. de lancement DESCRIPTION Estimatif en par e de /Fin de No. passation de la en US$ la marchés prestations des procédure Banque marchés II. SÉLECTION DES CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable des marchés : Décisions de sélection sujette à la revue préalable de la Banque comme indiqué dans Seuils requis pour les décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans les paragraphes 3.5 à 3.8 de la Section III, et de l’Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI), en date de Juillet 2016,. Méthode de Seuils de revue a priori Observations sélection/Catégories de Montants estimatifs des marchés contrats en millions de dollars américains Méthode compétitive/Firmes de >= 0.5 consultants Entente directe/firmes de Les justifications pour consultants >= 0.5 l’entente directe devront être jointes et approuvées Entente avec le PPM directe/Consultants >= 0.2 individuel Méthode Compétitive >= 0.2 (Comparaison de CVs)/ Consultants individuels 2. Liste restreinte composée entièrement de firmes nationales: La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux en conformité avec les dispositions des Règlements de Passation des marchés., et l’Emprunteur ne procède pas à une publication dans UNDB 3. Autre arrangement spécial de Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission ; cependant, ce seuil ne devrait pas dépasser la contre-valeur de USD 300,000 sauf dans des cas exceptionnels telles des situations d’urgence en conformité au Règlement de Passation des marchés II- Liste de Marchés de Services de Consultants Méthode Date de Type Montant de Approche lancemen Commentair Réf. DESCRIPTION DES d'Exame Estimatif passatio de t de la e/Fin des No. MISSIONS n par la en US$ n des Marché procédur prestations Banque marchés e Lexique des Sigles et Abréviations ARMP Autorité de Régulation des Marchés Publics AOI Appel d’Offres International AON Appel d’Offres National A Revue a posteriori posteriori A Priori Revue a priori CI Consultant Individuel DC Demande de Cotations DNCMP Direction Nationale de Contrôle des Marchés Publics ED Sélection Directe ou Entente Directe PPM Plan de Passation des Marchés SFQ Sélection Fondée sur la Qualité SFQC Sélection Fondée sur la Qualité et le Coût SMC Sélection au Moindre Coût SQC Sélection fondée sur les Qualifications des Consultants PROCUREMENT Togo : Togo Economic Governance Project PLAN General Information Country: Togo Bank’s Approval Date of the Original Procurement Plan: 2018-08-28 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158078 GPN Date: 2018-08-17 Project Name: Togo Economic Governance Project Loan / Credit No: IDA / D2340, TF / A8463 P Executing Agency(ies): ermanent Secretariat for the follow-up of Reform Reforms and Financial Programs WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Implementation Request for Single Stage - One 002 / Achat de coffre fort IDA / D2340 Post Limited 718.64 Completed 2018-09-12 2018-09-07 2018-10-17 2018-10-31 2018-10-31 2019-01-09 Support Quotations Envelope 005 / Fourniture et Project Implementation Request for Single Stage - One installation d'un autocom et IDA / D2340 Post Limited 2,514.81 Signed 2018-10-13 2018-11-28 2018-11-17 2019-03-25 2018-12-17 Support Quotations Envelope accessoires téléphoniques 003 / Acquisition de Under Project Implementation Request for Single Stage - One fournitures de bureau pour IDA / D2340 Post Limited 0.00 Implementati 2018-09-12 2018-09-10 2018-10-17 2018-10-31 Support Quotations Envelope l'UCP on 006 / Fourniture et Management of Public installation de matériel Single Stage - One IDA / D2340 Investments and Public- Post Request for Bids Open - National 372,943.53 Signed 2018-09-28 2018-11-14 2018-10-03 2018-11-14 2018-11-14 2018-12-18 2018-12-14 2019-02-11 2019-01-27 2019-05-02 2019-03-28 informatique pour les Envelope Private Partnerships différents bénéficiaires 012 / Fourniture et Management of Public Pending installation de mobiliers de Request for Single Stage - One IDA / D2340 Investments and Public- Post Limited 0.00 Implementati 2018-10-08 2019-01-04 2019-02-03 bureau dans les structures Quotations Envelope Private Partnerships on bénéficiaires 014 / Achat d'une moto pour Project Implementation Request for Single Stage - One IDA / D2340 Post Limited 916.25 Completed 2018-10-10 2019-03-21 2018-11-28 2019-04-26 2018-12-28 2019-05-06 l'UCP Support Quotations Envelope 004 / Achat de tonners pour Project Implementation Request for Single Stage - One IDA / D2340 Post Limited 3,162.04 Signed 2018-10-20 2019-02-14 2018-11-24 2019-03-06 2018-12-08 l'UCP Support Quotations Envelope 013 / Acquisition d'un Project Implementation Request for Single Stage - One IDA / D2340 Post Limited 0.00 Canceled 2018-10-01 2018-11-02 2018-12-28 2019-01-27 véhicule de liaison pour l'UCP Support Quotations Envelope 13B / Acquisition de trois Project Implementation véhicules de liaison pour l'UCP IDA / D2340 Prior Direct Selection Direct 0.00 Canceled 2018-12-27 2019-01-01 2019-02-26 2019-02-05 2019-08-04 Support et le SP-PRPF 013C / Acquisition de trois Project Implementation UN Agencies véhicules de liaison pour l'UCP IDA / D2340 Post Direct 100,610.94 Signed 2019-03-15 2018-11-21 2019-03-20 2019-02-14 2019-04-24 2019-03-07 2019-06-14 Support (Direct) et le SP-PRPF Management of Public 034 / Acquisition de matériel Request for Single Stage - One IDA / D2340 Investments and Public- Post Limited 0.00 Canceled 2019-06-22 2019-08-24 2019-10-23 informatique Quotations Envelope Private Partnerships 054 / Fourniture et installation de climatiseurs Management of Public dans les locaux de la Request for Single Stage - One IDA / D2340 Investments and Public- Post Limited 8,909.65 Signed 2019-11-23 2019-11-28 2020-01-12 2020-03-11 2020-02-11 Direction Nationale de Quotations Envelope Private Partnerships Contrôle des Marchés Publics (DNCMP) 055 / Achat de quatre motos Management of Public Pending pour le compte de la Direction Request for Single Stage - One IDA / D2340 Investments and Public- Post Limited 0.00 Implementati 2019-12-28 2020-02-22 2020-03-07 Nationale de Contrôle des Quotations Envelope Private Partnerships on Marchés Publics (DNCMP) 070-20 / Acquisition de Increasing Public UN Agencies deux véhicules pour l'IGF et la IDA / D2340 Accountability and Citizen Post Direct 0.00 Canceled 2020-07-20 2020-07-25 2020-08-29 2020-12-27 (Direct) Cour des Comptes Engagement Management of Public 034A / Acquisition de Request for Single Stage - One IDA / D2340 Investments and Public- Post Open - National 164,466.10 Signed 2019-10-05 2019-12-23 2020-10-02 2020-02-21 matériel informatique Quotations Envelope Private Partnerships 069-20 / Acquisition de matériel informatique pour la Increasing Public Request for Single Stage - One Commission de Finances et du IDA / D2340 Accountability and Citizen Post Limited 0.00 Canceled 2020-09-19 2020-12-07 2021-02-05 Quotations Envelope Développement de Engagement l'Assemblée Nationale 073-20 / Acquisition d'un Management of Public Pending Single Stage - One logiciel de gestion de la IDA / D2340 Investments and Public- Post Request for Bids Open - International 0.00 Implementati 2020-10-26 2020-10-31 2020-12-12 2021-01-11 2021-02-24 2021-04-25 Envelope trésorerie (Banque du Trésor) Private Partnerships on Increasing Public Under 070A-20 / Achat de deux Request for Single Stage - One IDA / D2340 Accountability and Citizen Post Open - National 0.00 Implementati 2020-12-06 2021-02-16 2021-04-17 véhicules Quotations Envelope Engagement on Management of Public Pending 069A-20 / Achat de matériel Request for Single Stage - One TF / A8463 Investments and Public- Post Open - National 0.00 Implementati 2020-12-12 2021-02-22 2021-04-23 informatique Quotations Envelope Private Partnerships on Page 1 Management of Public Pending 095-21 / Acquisition de Single Stage - One IDA / D2340 Investments and Public- Post Request for Bids Open - International 0.00 Implementati 2021-07-26 2021-07-31 2021-09-11 2021-10-11 2021-11-15 2022-01-14 matériel informatique Envelope Private Partnerships on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 001 / Acquisition de logiciels Project Implementation Request for Single Stage - One de gestion financière et de IDA / D2340 Post Limited 36,365.07 Completed 2018-09-19 2018-09-04 2018-11-30 2018-11-29 2019-01-29 2019-02-04 Support Quotations Envelope suivi évaluation du projet 016 / Entretien des bureaux Project Implementation Request for Single Stage - One IDA / D2340 Post Limited 4,791.92 Signed 2018-10-17 2018-11-30 2018-12-05 2019-03-25 2020-12-04 de l'UCP Support Quotations Envelope 007 / Acquisition et Management of Public Request for Single Stage - One installation d'un logiciel IDA / D2340 Investments and Public- Post Open - National 0.00 Canceled 2018-10-27 2019-01-23 2019-02-22 Quotations Envelope d'exécution des projets Private Partnerships 008 / Acquisition et installation de logiciels de Management of Public traitement des données Request for Single Stage - One IDA / D2340 Investments and Public- Post Open - National 0.00 Canceled 2018-10-03 2018-12-30 2019-01-29 d'études des projets routiers Quotations Envelope Private Partnerships (COVADIS, MENSURA, HDM4, ARCH) 009 / Acquisition et Management of Public installation de logiciels de Request for Single Stage - One IDA / D2340 Investments and Public- Post Open - National 0.00 Canceled 2018-10-31 2019-01-02 2019-02-01 simulation de projets y Quotations Envelope Private Partnerships compris l'assistance technique 010 / Acquisition et Management of Public installation de deux logiciels Request for Single Stage - One IDA / D2340 Investments and Public- Post Open - National 0.00 Canceled 2018-10-03 2018-12-14 2019-01-13 de gestion électronique des Quotations Envelope Private Partnerships documents (GED) 011 / Acquisition et installation d'un logiciel pour Management of Public le suivi des dossiers afin de Request for Single Stage - One IDA / D2340 Investments and Public- Post Open - National 0.00 Canceled 2018-10-17 2019-01-13 2019-02-12 faciliter la contractualisation Quotations Envelope Private Partnerships des marchés et le suivi des projets et programmes 028 / Sélection d'un transitaire pour l'inspection avant embarquement et Project Implementation Request for Single Stage - One l'accomplissement des IDA / D2340 Post Limited 2,238.69 Signed 2019-03-19 2019-03-14 2019-05-14 2019-04-29 2019-06-04 Support Quotations Envelope formalités d'enlèvement des véhicules au Port Autonome de Lomé 035 / Assurance des Project Implementation Request for Single Stage - One IDA / D2340 Post Limited 3,925.72 Signed 2019-05-25 2019-05-07 2019-07-27 2019-08-27 2020-07-26 véhicules de l'UCP Support Quotations Envelope 033 / Edition et impression du manuel de procédures Management of Public pour la sélection, la Request for Single Stage - One IDA / D2340 Investments and Public- Post Limited 0.00 Canceled 2019-06-08 2019-08-03 2019-09-02 hiérarchisation et la Quotations Envelope Private Partnerships programmation des projets d'investissements publics 033A / Edition et impression du manuel de procédures Management of Public pour la sélection, la Request for Single Stage - One IDA / D2340 Investments and Public- Post Limited 4,695.57 Signed 2019-09-28 2019-09-11 2019-11-23 2019-11-14 2019-12-23 hiérarchisation et la Quotations Envelope Private Partnerships programmation des projets d'investissements publics 065-20 / Recrutement d’une agence de communication pour la Confection des dépliants, des flyers, des kakémonos et des plaquettes Increasing Public Pending Request for Single Stage - One sur l’organisation, les TF / A8463 Accountability and Citizen Post Limited 0.00 Implementati 2020-08-01 2020-09-20 2020-10-20 Quotations Envelope attributs, les objectifs, les Engagement on missions de la Cour des Comptes et conception des spots thématiques sur la Cour 072-20 / Assurance maladie Project Implementation Request for Single Stage - One groupe du personnel de IDA / D2340 Post Limited 17,610.33 Signed 2020-07-11 2020-07-08 2020-09-12 2020-08-10 2021-09-12 Support Quotations Envelope l'Unité de Coordination du PAGE 074-20 / Acquisition d'un système d'exploitation Windows Server et fourniture du logiciel GED pour le Management of Public Pending Request for Single Stage - One stockage des données de IDA / D2340 Investments and Public- Post Limited 0.00 Implementati 2020-08-15 2020-10-04 2020-12-03 Quotations Envelope marchés publics du Ministère Private Partnerships on des Infrastructures et du Transport et formation des utilisateurs 071-20 / Edition et Increasing Public impression du manuel Request for Single Stage - One IDA / D2340 Accountability and Citizen Post Limited 0.00 Canceled 2020-10-31 2021-01-02 2021-02-01 d'examen des projets de lois Quotations Envelope Engagement de finances 071A-20 / Impression des Increasing Public Pending Request for Single Stage - One documents du budget citoyen IDA / D2340 Accountability and Citizen Post Limited 0.00 Implementati 2020-10-31 2020-12-26 2021-01-25 Quotations Envelope 2020 du Togo Engagement on 075-20 / Hébergement de l’application de collecte des Management of Public Pending Request for Single Stage - One données relatives aux IDA / D2340 Investments and Public- Post Limited 0.00 Implementati 2020-12-19 2021-02-20 2021-03-07 Quotations Envelope marchés publics et Private Partnerships on délégations de service public Page 2 092-21 / Prestation Increasing Public Pending Request for Single Stage - One d’infographie du budget TF / A8463 Accountability and Citizen Post Limited 0.00 Implementati 2021-03-20 2021-05-15 2021-06-14 Quotations Envelope citoyen du Togo Engagement on Increasing Public Pending 097-20 / Edition du budget Request for Single Stage - One IDA / D2340 Accountability and Citizen Post Limited 0.00 Implementati 2021-07-24 2021-09-18 2021-11-17 citoyen de 2021 Quotations Envelope Engagement on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 027 / Sélection d'un cabinet Project Implementation Quality And Cost- IDA / D2340 Post Open - National 11,171.11 Signed 2018-10-12 2018-10-19 2018-11-02 2018-11-16 2018-12-16 2019-02-22 2019-01-13 2019-03-25 2019-02-12 2019-04-05 2019-03-19 2019-04-30 2019-05-02 2019-05-29 2019-10-09 pour l'audit externe du projet Support Based Selection 017 / Recrutement d'une agence chargée de la Consultant Project Implementation vérification des indicateurs IDA / D2340 Post Qualification Open - International 0.00 Canceled 2018-09-14 2018-10-05 2018-11-18 2018-12-18 2019-01-22 2019-02-21 Support déclencheurs des Selection décaissements de l'OTR 017C / Recrutement d'une agence chargée de la Consultant Project Implementation vérification des indicateurs IDA / D2340 Prior Qualification Limited 212,029.50 Signed 2018-10-31 2018-10-24 2018-11-14 2018-11-19 2018-12-14 2019-01-23 2019-01-18 2019-02-15 2019-02-17 Support déclencheurs des Selection décaissements de l'OTR 017B / Recrutement d'une agence chargée de la Consultant Project Implementation vérification des indicateurs IDA / D2340 Post Qualification Limited 0.00 Canceled 2018-09-14 2018-09-17 2018-09-28 2018-09-17 2018-10-28 2018-12-11 2019-06-09 Support déclenchareurs des Selection décaissements de l'OTR 029 / Recrutement d'un cabinet chargé de réaliser l'état des lieux (données de référence) de la satisfaction Increasing Public Consultant des prestations dans des IDA / D2340 Accountability and Citizen Post Qualification Open - National 83,487.75 Signed 2019-04-29 2019-03-26 2019-05-20 2019-04-12 2019-07-03 2019-07-03 2019-08-02 2019-11-06 2019-09-06 2019-11-28 2019-12-05 secteurs prioritaires Engagement Selection (éducation primaire, santé maternelle et infantile et l'accès à l'eau potable en milieu urbain) 020C / Sélection d'un cabinet pour la réalisation la mission Management of Public Consultant de professionnalisation de la IDA / D2340 Investments and Public- Post Qualification Open - International 0.00 Canceled 2019-05-13 2019-05-12 2019-06-03 2019-06-24 2019-07-17 2019-08-16 2019-09-20 2020-02-17 fonction de passation des Private Partnerships Selection marchés publics au Togo. 020B / Recrutement d'un consultant chargé de réaliser une évaluation des capacités, d'identifier les besoins en Management of Public Quality And Cost- formation et d'élaborer un IDA / D2340 Investments and Public- Post Open - International 0.00 Canceled 2018-11-30 2019-04-10 2018-12-21 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-20 2020-02-20 Based Selection schéma de Private Partnerships professionnalisation de la fonction de gestion des marchés publics 042 / Recrutement d'une firme pour la réorganisation du Secrétariat Permanent pour Consultant le suivi des Politiques de Project Implementation Under IDA / D2340 Post Qualification Open - National 0.00 2019-06-24 2019-08-30 2019-07-15 2019-10-18 2019-08-28 2019-09-27 2019-11-01 2019-12-01 Réformes et des Programme Support Implementation Selection Financiers (SP-PRPF) et l'élaboration d'un plan d'action 032 / Recrutement d'une firme pour l'élaboration de cartographie des risques, la Increasing Public Consultant formation des cadres et la IDA / D2340 Accountability and Citizen Post Qualification Open - International 183,904.54 Signed 2019-05-27 2019-06-17 2019-06-17 2019-06-25 2019-07-31 2019-09-24 2019-08-30 2019-11-11 2019-10-04 2019-12-13 2020-01-02 mise en œuvre de l'approche Engagement Selection d'audit basée sur les risques au niveau de quatre (4) ministères. 045A / Recrutement d'un Cabinet chargé de Consultant Communication sur les Project Implementation Under IDA / D2340 Post Qualification Open - National 0.00 2019-10-31 2019-10-14 2019-11-30 2019-12-24 2020-01-29 2020-02-28 2020-04-12 2022-04-12 activités du Projet d'Appui à la Support Implementation Selection Gouvernance Economique (PAGE) 057-20 / Sélection d'un cabinet pour la réalisation de Management of Public Consultant la mission de Under IDA / D2340 Investments and Public- Post Qualification Open - International 0.00 2020-06-02 2020-03-27 2020-07-02 2020-05-20 2020-08-31 2020-09-30 2020-11-04 2021-05-03 professionnalisation de la Implementation Private Partnerships Selection fonction de passation de marchés publics au Togo 059-20 / Recrutement d'un consultant pour la Management of Public Consultant détermination des valeurs IDA / D2340 Investments and Public- Post Qualification Open 0.00 Under Review 2020-07-27 2021-04-30 2020-08-17 2020-09-30 2020-10-30 2020-12-04 2021-01-03 tutélaires du Togo dans le Private Partnerships Selection cadre de l'évaluation ex-anté des projets d'investissement 058-20 / Recrutement d'un consultant pour l'élaboration Management of Public Consultant de la politique et du plan Under IDA / D2340 Investments and Public- Post Qualification Open - International 0.00 2020-06-22 2020-05-26 2020-07-13 2020-06-17 2020-08-26 2020-09-25 2020-11-24 2021-03-24 stratégique de l'Autorité de Implementation Private Partnerships Selection Régulation des Marchés Publics (ARMP) 094-21 / Recrutement d'un Institut International pour la Management of Public Least Cost Pending formation modulaire des IDA / D2340 Investments and Public- Post Open - International 0.00 2021-08-30 2021-09-20 2021-11-03 2021-12-01 2021-12-31 2022-02-04 2022-03-11 2022-06-09 Selection Implementation cadres de l'administration sur Private Partnerships la chaine PPBSE Page 3 098-21 / Recrutement d’un cabinet pour l'audit financier Project Implementation Least Cost Under IDA / D2340 Post Open - National 0.00 2021-10-04 2021-05-21 2021-10-25 2021-12-08 2022-01-05 2022-02-04 2022-03-11 2022-04-15 2022-05-15 et comptable du PAGE Support Selection Implementation (exercices 2021 et 2022) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual 024 / Recrutement d'un Project Implementation IDA / D2340 Post Consultant Open 17,774.91 Signed 2018-09-28 2018-08-31 2018-11-16 2018-12-04 2018-12-07 2019-01-08 2019-01-11 2019-01-08 2020-01-11 Comptable pour l'UCP Support Selection Individual 025 / Recrutement d'un Project Implementation Under IDA / D2340 Post Consultant Open 0.00 2018-09-28 2018-08-31 2018-11-16 2018-12-07 2019-01-11 2020-01-11 chauffeur pour l'UCP Support Implementation Selection Individual 026 / Recrutement d'un Project Implementation IDA / D2340 Post Consultant Open 3,524.83 Signed 2018-09-28 2018-08-31 2018-11-16 2018-12-06 2018-12-07 2019-02-20 2019-01-11 2019-03-04 2020-01-11 coursier pour l'UCP Support Selection 020 / Recrutement d'un consultant chargé de réaliser une évaluation des capacités, d'identifier les besoins en Management of Public Individual formation et d'élaborer un IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2018-09-28 2018-11-16 2018-12-07 2019-01-11 2019-02-10 schéma de Private Partnerships Selection professionnalisation de la fonction de gestion des marchés publics 018 / Recrutement d'un consultant international pour la finalisation du manuel de Management of Public Individual procédures pour la sélection, IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2018-12-07 2019-01-25 2019-02-15 2019-03-22 2019-04-21 la hiérarchisation et la Private Partnerships Selection programmation des projets d'investissements publics 019 / Recrutement d'un consultant pour la formation à Management of Public Individual l'élaboration et à la gestion IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2018-11-16 2019-01-04 2019-01-25 2019-03-01 2019-03-31 des contrats particuliers aux Private Partnerships Selection termes d'accords-cadres et des contrats pluriannuels 023 / Recrutement d'un consultant pour un appui à Increasing Public Individual l'élaboration du plan IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 Canceled 2018-10-19 2018-12-07 2018-12-28 2019-02-01 2019-03-03 stratégique de la Cour des Engagement Selection Comptes du Togo 021 / Recrutement d'un consultant international chargé de former le personnel sur l'élaboration de la Increasing Public Individual cartographie basée sur le IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 Canceled 2018-09-28 2018-10-19 2018-11-16 2018-12-07 2019-01-11 2019-02-10 risque et d'accompagner l'IGF Engagement Selection dans la réalisation des missions basées dans cinq ministères clés 022 / Recrutement d'un consultant local chargé de former le personnel sur l'élaboration de la Increasing Public Individual cartographie basée sur le IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 Canceled 2018-09-28 2018-10-19 2018-11-16 2018-12-07 2019-01-11 2019-02-10 risque et d'accompagner l'IGF Engagement Selection dans la réalisation des missions basées dans cinq ministères clés 031 / Recrutement d'un consultant individuel international pour Increasing Public Individual l'élaboration du guide du IDA / D2340 Accountability and Citizen Post Consultant Open 32,810.26 Signed 2019-05-20 2019-03-26 2019-07-08 2019-06-28 2019-07-29 2019-07-26 2019-09-02 2019-08-16 2019-11-01 budget citoyen, la formation Engagement Selection des membres du groupe de travail et l'appui à l'élaboration 040 / Recrutement d'un consultant individuel international pour la Management of Public Individual formation des cadres sur les IDA / D2340 Investments and Public- Post Consultant Open 0.00 Under Review 2019-06-24 2019-07-08 2019-08-12 2019-09-02 2019-10-07 2019-11-21 contrats particuliers aux Private Partnerships Selection termes d'accords-cadres et des contrats pluriannuels 043 / Recrutement d'un consultant pour la formation Management of Public Individual des cadres du bassin de IDA / D2340 Investments and Public- Post Consultant Open 0.00 Under Review 2019-07-08 2019-06-28 2019-08-26 2019-09-16 2019-10-21 2019-11-20 formateurs sur les procédures Private Partnerships Selection de la Banque Mondiale 037 / Recrutement d'un consultant pour l'élaboration (amélioration et Management of Public Individual automatisation) des outils de IDA / D2340 Investments and Public- Post Consultant Open 25,906.60 Signed 2019-05-20 2019-06-17 2019-07-08 2019-10-08 2019-07-29 2019-11-26 2019-09-02 2020-02-24 2019-10-17 collectes et d'analye des Private Partnerships Selection données sur les marchés publics 046 / Recrutement d'un Individual Project Implementation Under Chauffeur pour l'Unité de IDA / D2340 Post Consultant Open 0.00 2019-06-24 2019-06-26 2019-08-12 2019-09-02 2019-10-16 2020-10-10 Support Implementation Coordination du Projet Selection Page 4 047 / Recrutement d'un consultant individuel international pour la formation de la Commission Increasing Public Individual des Finances et du IDA / D2340 Accountability and Citizen Post Consultant Direct 2,601.75 Completed 2019-07-10 2019-08-19 2019-07-20 2019-10-01 2019-07-28 2019-08-13 2019-10-16 2019-08-27 2019-10-22 Développement Economique Engagement Selection de l'Assemblée Nationale sur le débat d'orientation budgétaire (DOB) et sur le budget programme 045 / Recrutement d'un Individual Chargé de Communication Project Implementation IDA / D2340 Post Consultant Open 0.00 Canceled 2019-07-15 2019-09-02 2019-09-23 2019-11-06 2020-10-31 pour l'Unité de Coordination Support Selection du Projet 048 / Recrutement d'un consultant individuel Increasing Public Individual Under infographiste pour IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 2019-12-13 2019-08-30 2020-01-31 2020-02-21 2020-03-27 2020-06-25 Implementation transformer en version Engagement Selection infogtaphiée le budget citoyen 049 / Recrutement d'un consultant individuel pour la conception et Increasing Public Individual l'opérationnalisation du site IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 Canceled 2019-12-09 2019-09-10 2020-01-27 2020-02-17 2020-03-23 2020-04-22 web de la Direction Générale Engagement Selection du Budget et des Finances (DGBF) 039 / Recrutement d'un consultant individuel international pour Management of Public Individual l'élaboration d'un mécanisme IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2019-06-03 2019-07-22 2019-08-12 2019-09-16 2019-10-31 de suivi des recommandations Private Partnerships Selection des missions d'audit des marchés publics 038 / Recrutement d'un consultant individuel international pour Management of Public Individual l'élaboration de la grille de IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2019-05-27 2019-07-15 2019-08-05 2019-09-09 2019-10-24 classement des Autorités Private Partnerships Selection Contractantes en termes de bonne pratiques dans les marchés publics 050 / Recrutement d'un consultant individuel pour la Management of Public Individual Under modernisation du site web de IDA / D2340 Investments and Public- Post Consultant Limited 0.00 2019-09-02 2019-08-19 2019-09-07 2019-09-28 2019-11-02 2019-12-17 Implementation l'Autorité de Régulation des Private Partnerships Selection Marchés Publics (ARMP) 051 / Recrutement d’un Consultant individuel local pour la réalisation de la Management of Public Individual mission d’évaluation du IDA / D2340 Investments and Public- Post Consultant Direct 34,247.76 Signed 2019-09-09 2019-08-19 2019-09-19 2019-08-28 2019-10-10 2019-09-11 2019-11-14 2019-10-28 2020-02-12 système des marchés publics Private Partnerships Selection du Togo selon la méthodologie MAPS II 056-20 / Recrutement d'un Individual Assistant Administratif pour Project Implementation Under IDA / D2340 Post Consultant Open 0.00 2020-04-30 2020-03-27 2020-06-18 2020-07-09 2020-08-13 2021-02-09 l'Unité de Coordination du Support Implementation Selection Projet 044 / Recrutement d'un consultant pour un appui à Increasing Public Individual l'élaboration du plan IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 Canceled 2019-09-30 2019-11-18 2019-12-09 2020-01-13 2020-02-27 stratégique de la cour des Engagement Selection comptes 036 / Recrutement d'un consultant local pour l'élaboration d'un texte Management of Public Individual réglementant la gestion des IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2019-05-27 2019-07-08 2019-07-15 2019-08-05 2019-09-09 2019-10-09 archives produites dans le Private Partnerships Selection cadre des marchés publics et séances de travail du comité de suivi 041 / Recrutement d'un consultant individuel local Management of Public Individual pour la mise en place d'une IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2019-06-17 2019-08-05 2019-08-26 2019-09-30 2019-10-30 base de données informatisée Private Partnerships Selection des projets d'ivestissements publics 052 / Recrutement d'un consultant individuel pour Management of Public Individual l'élaboration du plan IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2019-09-09 2019-08-19 2019-10-28 2019-11-18 2019-12-23 2020-01-01 stratégique de l'Autorité de Private Partnerships Selection Régulation des Marchés Publics (ARMP) 061-20 / Recrutement au poste de Chef de la cellule de Individual la fiscalité directe et indirecte Supporting Domestic Under IDA / D2340 Post Consultant Open 0.00 2020-05-04 2020-05-07 2020-06-22 2020-07-13 2020-08-17 2021-08-17 : Analyste Principal Législation Resource Mobilization Implementation Selection Fiscale de l'Unité de Politique Fiscale 062-20 / Recrutement du Chef de la Cellule de la Individual Supporting Domestic Under fiscalité internationale : IDA / D2340 Post Consultant Open 0.00 2020-05-04 2020-05-07 2020-06-22 2020-07-13 2020-08-17 2021-08-17 Resource Mobilization Implementation Analyste principal fiscalité Selection internationale 063-20 / Recrutement au poste de Chef de la Cellule de Individual suivi opérationnel de l’OTR : Supporting Domestic Under IDA / D2340 Post Consultant Open 0.00 2020-05-04 2020-05-07 2020-06-22 2020-07-13 2020-08-17 2021-08-17 Analyste principal gestion de Resource Mobilization Implementation Selection la fiscalité de l'Unité de Politique Fiscale Page 5 066-20 / Recrutement d'un consultant individuel pour Increasing Public Individual Under l'élaboration du manuel IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 2020-08-03 2020-06-22 2020-09-21 2020-10-12 2020-11-16 2020-12-16 Implementation d'examen des projets de lois Engagement Selection de finances 067-20 / Recrutement d'un consultant pour la formation Increasing Public Individual Under des OSC dans le suivi du TF / A8463 Accountability and Citizen Post Consultant Open 0.00 2020-08-17 2020-06-22 2020-10-01 2020-10-22 2020-11-26 2020-12-26 Implementation processus budgétaire et le Engagement Selection suivi de l’exécution 053 / Recrutement d’un consultant individuel pour Management of Public Individual l'élaboration du manuel de IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2019-11-25 2019-11-25 2020-01-13 2020-02-03 2020-03-09 2020-05-08 suivi physique des Private Partnerships Selection investissements publics 064-20 / Recrutement de Individual deux Macroéconomistes pour Supporting Domestic Under IDA / D2340 Post Consultant Open 0.00 2020-06-08 2020-05-22 2020-07-27 2020-08-17 2020-09-21 2021-09-21 le compte de l'Unité de Resource Mobilization Implementation Selection Politique Fiscale 030 / Recrutement d'un Increasing Public Individual consultant individuel IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 Canceled 2019-05-20 2019-05-12 2019-07-08 2019-07-29 2019-09-02 2019-11-01 international pour la Engagement Selection formation sur l'outil BOOST 060-20 / Recrutement au Individual Supporting Domestic poste de Directeur de l'Unité IDA / D2340 Post Consultant Open 0.00 Canceled 2020-05-04 2020-06-22 2020-07-13 2020-08-17 2021-08-17 Resource Mobilization de Politique Fiscale Selection 060A-20 / Recrutement au Individual Supporting Domestic Under poste de Responsable de IDA / D2340 Post Consultant Open 0.00 2020-06-08 2020-05-22 2020-07-27 2020-08-17 2020-09-21 2021-09-21 Resource Mobilization Implementation l'Unité de Politique Fiscale Selection 076-20 / Sélection d’un cabinet spécialisé en gestion des ressources humaines (GRH) pour le recrutement des Management of Public conseillers techniques auprès Under IDA / D2340 Investments and Public- Post Direct Selection Direct 0.00 2020-12-07 2020-11-19 2020-12-17 2020-11-27 2021-03-01 2021-05-30 du ministre et des cadres Implementation Private Partnerships supérieurs au profit de certains services stratégiques du ministère de l’économie et des finances 077-21 / Recrutement de Management of Public Individual deux (2) cadres juniors en Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 appui à la direction générale Implementation Private Partnerships Selection du budget et des finances 078-21 / Recrutement de Management of Public Individual deux (2) cadres juniors en Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 appui à la direction nationale Implementation Private Partnerships Selection du contrôle financier 079-21 / Recrutement de Management of Public Individual deux (2) cadres juniors en Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 appui à la direction des Implementation Private Partnerships Selection ressources humaines 080-21 / Recrutement de Management of Public Individual deux (2) cadres Juniors en Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 appui á la direction de la dette Implementation Private Partnerships Selection publique et du financement 081-21 / Recrutement de deux (2) cadres Juniors en Management of Public Individual Under appui à la direction générale IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 Implementation des études et analyses Private Partnerships Selection économiques 082-21 / Recrutement d’un Management of Public Individual haut cadre en appui à la Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 direction nationale du Implementation Private Partnerships Selection contrôle financier 083-21 / Recrutement d’un Management of Public Individual haut cadre en appui à la Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 direction des ressources Implementation Private Partnerships Selection humaines 084-21 / Recrutement d’un Management of Public Individual haut cadre en appui à la Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 direction de la dette publique Implementation Private Partnerships Selection et du financement 085-21 / Recrutement d’un Management of Public Individual haut cadre en appui à la Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 direction générale des études Implementation Private Partnerships Selection et analyses économiques 086-21 / Recrutement d’un Management of Public Individual haut cadre en appui à la Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 direction générale du budget Implementation Private Partnerships Selection et des finances 087-21 / Recrutement d'un conseiller technique auprès Management of Public Individual Under du Ministre de l'Economie et IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 Implementation des Finances, chargé des Private Partnerships Selection questions d'agriculture 088-21 / Recrutement d'un conseiller technique auprès Management of Public Individual Under du Ministre de l'Economie et IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 Implementation des Finances, chargé des Private Partnerships Selection questions de la santé Page 6 090-21 / Recrutement d'un conseiller technique auprès Management of Public Individual Under du Ministre de l'Economie et IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-01 2021-05-17 2021-06-07 2021-07-21 2022-07-21 Implementation des Finances, chargé des Private Partnerships Selection questions des infrastructures 089A-21 / Recrutement de conseiller technique du Management of Public Individual Ministre de l’Economie et des Under IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-10 2021-05-17 2021-06-07 2021-07-12 2022-07-12 Finances en charge des Implementation Private Partnerships Selection secteurs des mines, de l’énergie et de l’eau 089-21 / Recrutement d'un conseiller technique auprès Management of Public Individual du Ministre de l'Economie et IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2021-03-29 2021-05-17 2021-06-07 2021-07-21 2022-07-21 des Finances, chargé des Private Partnerships Selection questions de l'Eau 091-21 / Recrutement d'un conseiller technique auprès Management of Public Individual du Ministre de l'Economie et IDA / D2340 Investments and Public- Post Consultant Open 0.00 Canceled 2021-03-29 2021-05-17 2021-06-07 2021-07-21 2022-07-21 des Finances, chargé des Private Partnerships Selection questions de l'Energie 091A-21 / Recrutement de conseiller technique du Management of Public Individual Under Ministre de l’Economie et des IDA / D2340 Investments and Public- Post Consultant Open 0.00 2021-03-29 2021-03-10 2021-05-17 2021-06-07 2021-07-12 2022-07-12 Implementation Finances en charge du secteur Private Partnerships Selection de l'Education 093-21 / Recrutement d'un consultant individuel pour Individual l'évaluation à mi-parcours du Project Implementation Under IDA / D2340 Post Consultant Limited 18,986.10 2021-03-29 2021-03-15 2021-04-03 2021-03-15 2021-04-24 2021-03-22 2021-05-29 2021-06-28 Projet d'Appui à la Support Implementation Selection Gouvernance Economique (PAGE) 096-21 / Sélection d'un Increasing Public Individual consultant individuel pour la Pending IDA / D2340 Accountability and Citizen Post Consultant Open 0.00 2021-09-27 2021-11-15 2021-12-06 2022-01-10 2022-02-09 formation sur la Budgétisation Implementation Engagement Selection sensible au genre 099-21 / Recrutement d’un consultant individuel pour la Increasing Public Individual conception et TF / A8463 Accountability and Citizen Post Consultant Open 0.00 Under Review 2021-08-02 2021-05-27 2021-09-20 2021-10-11 2021-11-15 2022-01-14 l’opérationnalisation du site Engagement Selection web de la Direction Générale du Budget et des Finances 100-21 / Recrutement d'un Responsable de Suivi- Individual Project Implementation Under Evaluation pour le Projet IDA / D2340 Post Consultant Open 0.00 2021-08-02 2021-06-09 2021-09-30 2021-10-21 2021-11-25 2022-11-25 Support Implementation d'Appui à la Gouvernance Selection Economique Page 7 PROCUREMENT PLAN (Textual Part) Project information: Sierra Leone – Smallholder Commercialisation and Agribusiness Development Project (SCADeP)- P153437 Project Implementation agency: Ministry of Agriculture, Forestry and Food Security Date of the Procurement Plan: February 16, 2018 Period covered by this Procurement Plan: January -December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in National Public Procurement Act 2004, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. NOT APPLICABLE Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables NOT APPLICABLE Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). NOT APPLICABLE Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. PROCUREMENT Sierra Leone : Smallholder Commercialization and Agribusiness Development Project PLAN General Information Country: Sierra Leone Bank’s Approval Date of the Original Procurement Plan: 2018-04-10 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153437 GPN Date: Project Name: Smallholder Commercialization and Agribusiness Development Project Loan / Credit No: IDA / 57670 Ministry of Agriculture and Food Security Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SL-MAFS-73199-CW-RFQ / Capacity Building support for Construction of SLeCAD state and non-state Request for Single Stage - One 2019-07- IDA / 57670 Post Limited 90,000.00 153,762.22 Signed 2018-11-17 2018-11-19 2019-01-12 2018-12-11 headquarter building in institutions and producer Quotations Envelope 11 Freetown organizations Capacity Building support for SL-MAFS-46930-CW-RFQ / state and non-state Request for Single Stage - One 2019-07- Rehabilitate vet clinic at Tower IDA / 57670 Post Limited 10,000.00 0.00 Canceled 2018-11-28 2019-01-23 institutions and producer Quotations Envelope 22 hill. organizations SL-MAFS-39295-CW-RFQ / Capacity Building support for Construction of poultry Pending state and non-state Request for Single Stage - One 2019-07- buildings (X3) and bore hole IDA / 57670 Post Limited 40,000.00 0.00 Implementat 2018-11-28 2019-01-23 institutions and producer Quotations Envelope 22 for Teko Research Center, ion organizations SLARI SL-MAFS-91279-CW-RFB / Rehabilitation of 142Km of Under feeder roads in six distrcits Single Stage - One 2019-10- IDA / 57670 Market Access Improvement Post Request for Bids Open - National 4,707,309.85 0.00 Implementat 2018-12-19 2018-12-21 2018-12-24 2019-02-04 2019-02-01 2019-03-06 2019-04-10 (Bonthe, Port Loko, Kailahun, Envelope 07 ion Moyamba, Tonkolili, and Kono) in Sierra Leone (six lots) SL-MAFS-170585-CW-RFQ / Rehabilitation of 40Km of irrigation canal at Kobia and Pending Mange sites, including Contingency Emergency Request for Single Stage - One 2020-12- IDA / 57670 Post Limited 126,263.00 0.00 Implementat 2020-05-04 2020-06-29 clearing and repairing of Response Quotations Envelope 26 ion canals, replacement of pumps, repairing of slits gates (Emergency COVID-19) SL-MAFS-48897-CW-RFQ / Capacity Building support for Construction of Experimental state and non-state Request for Single Stage - One 2019-07- IDA / 57670 Post Limited 50,000.00 0.00 Canceled 2018-11-14 2019-07-22 2019-01-09 Building, Including fence and institutions and producer Quotations Envelope 08 water well in Bombali organizations SL-MAFS-48928-CW-RFQ / Rehabilitation of Laboratory Capacity Building support for and Office building and state and non-state Request for Single Stage - One 2019-07- Construction of training IDA / 57670 Post Limited 40,000.00 0.00 Canceled 2018-11-19 2019-05-30 2019-01-14 institutions and producer Quotations Envelope 13 facility (including water organizations system for nursery and drying floor at Pendembu) SL-MAFS-48900-CW-RFQ / Capacity Building support for Construction of Green House state and non-state Request for Single Stage - One 2019-07- IDA / 57670 Post Limited 30,000.00 0.00 Canceled 2018-12-01 2019-05-30 2019-01-26 and rehabilitation of nursery institutions and producer Quotations Envelope 25 infrastructure at Kpuwabu organizations SL-MAFS-173616-CW-RFQ / Capacity Building support for Pending Construction of Experimental state and non-state Request for Single Stage - One 2021-01- IDA / 57670 Post Limited 60,000.00 0.00 Implementat 2020-05-23 2020-07-18 Building, including fence and institutions and producer Quotations Envelope 14 ion water well in Bombali District organizations SL-MAFS-173618-CW-RFQ / Rehabilitation of Laboratory Capacity Building support for and office Building and Pending state and non-state Request for Single Stage - One 2021-01- construction of training IDA / 57670 Post Limited 50,000.00 0.00 Implementat 2020-05-23 2020-07-18 institutions and producer Quotations Envelope 14 facility (including water ion organizations system for nursery and drying floor at Pendembu) SL-MAFS-173620-CW-RFQ / Capacity Building support for Construction of Green House Pending state and non-state Request for Single Stage - One 2021-01- and Rehabilitation of nursery IDA / 57670 Post Limited 40,000.00 0.00 Implementat 2020-05-23 2020-07-18 institutions and producer Quotations Envelope 14 infrastructure at Kpuwabu, ion organizations Kenema SL-MAFS-216388-CW-RFQ / Support to agribusiness- Rehabilitation and Pending farmer linkages and SMEs Request for Single Stage - One 2021-12- refurbishment of National IDA / 57670 Post Limited 40,000.00 0.00 Implementat 2021-04-28 2021-06-23 along selected agricultural Quotations Envelope 20 Farmers Federation of Sierra ion value chains Leone Office SL-MAFS-48876-CW-RFB / Spot improvement including Single Stage - One 2019-09- construction of small bridges IDA / 57670 Market Access Improvement Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2018-11-30 2018-12-05 2019-01-16 2019-02-15 2019-03-22 Envelope 18 and culverts in eight (8) Districts in Sierra Leone. SL-MAFS-216552-CW-RFP / Design and Build Rural Request for Single Stage - Two 26,000,000.0 Under 2023-04- Bridges to replace manual IDA / 57670 Market Access Improvement Prior Open - International 0.00 2021-02-15 2021-05-03 2021-05-03 2021-02-20 2021-07-12 2021-09-24 2021-10-29 Proposals Envelope 0 Review 22 cable ferries in selected districts in Sierra Leone ( Five 5 Lots proposed ) Page 1 SL-MAFS-216709-CW-RFB / Spot improvements , including construction of relatively long embankments,small Pending bridges/culverts to link Single Stage - One 2021-12- IDA / 57670 Market Access Improvement Post Request for Bids Open - National 2,500,000.00 0.00 Implementat 2021-02-12 2021-02-17 2021-03-31 2021-04-30 2021-06-04 Agribusiness /Producers Envelope 01 ion Organizations under the project and other critical areas in Kambia and Port Loko Districts ( Two Lots) SL-MAFS-216654-CW-RFQ / Construction of rigid pavement along critical/hilly Pending Request for 2021-10- sections of feeder roads to IDA / 57670 Market Access Improvement Post 60,000.00 0.00 Implementat 2021-02-12 2021-04-09 Quotations 06 link Agribusiness/Producers ion Organizations in Tonkolili Districts SL-MAFS-217080-CW-RFQ / Spot improvements of feeder Pending roads to link Request for Single Stage - One 2021-10- IDA / 57670 Market Access Improvement Post Limited 198,500.00 0.00 Implementat 2021-02-13 2021-04-10 Agribusiness/Producers Quotations Envelope 07 ion Organizations in Bombali District SL-MAFS-217082-CW-RFQ / Construction of a bridge and rigid pavement along Pending Request for Single Stage - One 2021-10- critical/hilly sections of feeder IDA / 57670 Market Access Improvement Post Limited 170,000.00 0.00 Implementat 2021-02-13 2021-04-10 Quotations Envelope 07 roads to link ion Agribusiness/Producers Organizations in Kono District SL-MAFS-217083-CW-RFQ / Construction of rigid pavement along critical/hilly Pending Request for Single Stage - One 2021-10- sections of feeder roads to IDA / 57670 Market Access Improvement Post Limited 35,000.00 0.00 Implementat 2021-02-14 2021-04-11 Quotations Envelope 08 link Agribusiness/Producers ion Organizations in Moyamba District SL-MAFS-217085-CW-RFQ / Spot improvements and construction of rigid Pending pavement along critical/hilly Request for Single Stage - One 2021-10- IDA / 57670 Market Access Improvement Post Limited 165,000.00 0.00 Implementat 2021-02-17 2021-04-14 sections of feeder roads to Quotations Envelope 11 ion link Agribusiness/Producers Organizations in Kailahun District SL-MAFS-217086-CW-RFQ / Spot improvements of feeder Pending Request for Single Stage - One 2021-10- roads to link IDA / 57670 Market Access Improvement Post Limited 100,000.00 0.00 Implementat 2021-02-17 2021-04-14 Quotations Envelope 11 Agribusiness/Producers ion Organizations in Bo District GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MAFS-63652-GO-DIR / Capacity Building support for Procurement of oil palm Pending state and non-state seedlings for research and IDA / 57670 Post Direct Selection Direct 15,000.00 0.00 Implementati 2018-06-08 2018-06-13 2018-07-18 2019-01-14 institutions and producer community nursery at on organizations Pendembu Capacity Building support for SL-MAFS-49243-GO-RFQ / state and non-state Request for Single Stage - One Procurement of Generators for IDA / 57670 Post Limited 50,000.00 0.00 Canceled 2018-12-05 2019-01-30 2019-07-29 institutions and producer Quotations Envelope NaFFSL and SLeCAD organizations SL-MAFS-48920-GO-RFQ / Procurement of PPEs and Capacity Building support for safeguards equipment and state and non-state Request for Single Stage - One provision of Assorted IDA / 57670 Post Limited 25,000.00 0.00 Canceled 2018-11-05 2018-12-31 2019-06-29 institutions and producer Quotations Envelope engineering tools (GPS, organizations Measuring wheel and tape, etc) for MAFFS SL-MAFS-49260-GO-RFQ / Capacity Building support for Procurement of Veterinary state and non-state Request for Single Stage - One IDA / 57670 Post Limited 10,000.00 7,000.00 Signed 2018-11-19 2019-04-30 2019-01-14 2019-05-20 2019-07-13 drugs and vaccines (poultry) institutions and producer Quotations Envelope for Pendembu organizations SL-MAFS-49255-GO-RFQ / Capacity Building support for Procurement of poultry state and non-state Request for Single Stage - One housing equipment and IDA / 57670 Post Limited 12,000.00 32,101.20 Signed 2018-12-05 2019-05-02 2019-01-30 2019-05-20 2019-07-29 institutions and producer Quotations Envelope clinical equipment for organizations Pendembu SL-MAFS-49278-GO-RFQ / Support to agribusiness- Procurement of Rice Milling farmer linkages and SMEs Request for Single Stage - One Machines, Threshers and IDA / 57670 Post Limited 90,000.00 0.00 Canceled 2018-12-03 2019-01-28 2019-07-27 along selected agricultural Quotations Envelope Stitching Machines for value chains selected ABCs/FBOs SL-MAFS-46937-GO-RFQ / Procurement of quality control Capacity Building support for and grading equipment state and non-state Request for Single Stage - One (moisture meter, Moisture IDA / 57670 Post Limited 30,000.00 0.00 Canceled 2018-12-05 2017-09-08 2019-01-30 2019-07-29 institutions and producer Quotations Envelope tester, weighing scales, organizations Pollinating Bags, Grading Scale etc ) Capacity Building support for SL-MAFS-49249-GO-RFQ / state and non-state Request for Single Stage - One Procurement of laboratory IDA / 57670 Post Limited 10,000.00 45,438.88 Signed 2018-12-05 2019-04-29 2019-01-30 2019-05-15 2019-07-29 institutions and producer Quotations Envelope equipment- Pendembu organizations Page 2 SL-MAFS-49274-GO-RFQ / Support to agribusiness- Procurement of Parboiling farmer linkages and SMEs Request for Single Stage - One IDA / 57670 Post Limited 95,000.00 0.00 Canceled 2018-12-05 2019-01-30 2019-07-29 Equipment for selected along selected agricultural Quotations Envelope ABCs/FBOs value chains SL-MAFS-91289-GO-RFQ / Procurement of (i) computers (4) for workstation for improvement of data processing and uploading to Request for Single Stage - One IDA / 57670 Market Access Improvement Post Limited 35,000.00 28,230.52 Signed 2018-12-29 2018-12-28 2019-02-23 2019-01-15 2019-08-22 the server, (ii) 32 tablets for Quotations Envelope data collection from the field and 9iii) software to upgrade server capacity for PEMSD, MAF SL-MAFS-49282-GO-RFQ / Procurement of Argo- Capacity Building support for Chemicals (Pesticides and state and non-state Request for Single Stage - One IDA / 57670 Post Limited 50,000.00 12,598.71 Signed 2018-06-05 2018-05-31 2018-07-31 2018-06-14 2019-01-27 fertilizer, Urea, KCL) for institutions and producer Quotations Envelope Kenema Forestry and Tree organizations Crops Research Center SL-MAFS-108330-GO-DIR / Procurement of 50Mt GBS 9 Support to agribusiness- Certified Seed Rice ,150MT farmer linkages and SMEs IDA / 57670 Prior Direct Selection Direct 480,882.00 480,882.00 Signed 2019-04-03 2019-04-02 2019-04-08 2019-05-13 2019-04-05 2019-11-09 OM-6976 Certified Seed Rice along selected agricultural and 25MT GBS 9 Foundation value chains Seed Rice from Vietnam SL-MAFS-108331-GO-DIR / Support to agribusiness- Procurement of 225MT farmer linkages and SMEs NERICA L19 Certified Seed IDA / 57670 Prior Direct Selection Direct 625,000.00 0.00 Under Review 2019-04-03 2019-04-03 2019-04-08 2019-05-13 2019-11-09 along selected agricultural Rice and 50MT NERICA L19 value chains Foundation from Burkina Faso SL-MAFS-108332-GO-DIR / Support to agribusiness- Under Procurement of 200 MT FARO farmer linkages and SMEs IDA / 57670 Post Direct Selection Direct 360,000.00 0.00 Implementati 2019-04-03 2019-04-08 2019-05-13 2019-11-09 Certified Rice Seed from along selected agricultural on Nigeria value chains SL-MAFS-108368-GO-RFQ / Procurement of 40 MT of Urea Support to agribusiness- Under and 75 MT of MPK 15:15:15 farmer linkages and SMEs Request for Single Stage - One IDA / 57670 Post Open - National 95,000.00 90,747.08 Implementati 2019-04-15 2019-06-10 2019-05-03 2019-12-07 for foundation seed for along selected agricultural Quotations Envelope on Ministry of Agriculture and value chains Forestry Support to agribusiness- SL-MAFS-110338-GO-DIR / Under farmer linkages and SMEs Procurement of 25Mt Certified IDA / 57670 Post Direct Selection Direct 45,000.00 0.00 Implementati 2019-04-15 2019-04-20 2019-05-25 2019-11-21 along selected agricultural seed rice Nerica L 19 on value chains SL-MAFS-113070-GO-RFQ / Project Management, Request for Single Stage - One Procurement of assorted IDA / 57670 Post Limited 7,000.00 6,336.68 Signed 2019-06-05 2019-08-19 2019-07-31 2019-09-05 2020-01-27 Monitoring and Evaluation Quotations Envelope communications equipment SL-MAFS-113072-GO-RFQ / Procurement of quality control Capacity Building support for and grading equipment based state and non-state Request for Single Stage - One IDA / 57670 Post Limited 50,000.00 52,992.48 Signed 2019-06-19 2019-08-23 2019-08-14 2019-09-05 2020-02-10 on the capacity building institutions and producer Quotations Envelope assessment report ready for organizations training SL-MAFS-129817-GO-RFQ / Procurement of Computers and Accessories, Printers, Project Management, Request for Single Stage - One IDA / 57670 Post Open - National 95,000.00 89,755.20 Signed 2019-09-28 2019-11-23 2019-10-08 2020-05-21 Photocopiers Machines, Monitoring and Evaluation Quotations Envelope Scanners and Heavy Duty Machine Capacity Building support for SL-MAFS-133857-GO-RFQ / Pending state and non-state Request for Single Stage - One Procurement of office IDA / 57670 Post Open - National 50,000.00 0.00 Implementati 2019-10-16 2019-12-11 2020-06-08 institutions and producer Quotations Envelope furniture for MAF and MoTI on organizations Capacity Building support for SL-MAFS-148457-GO-RFQ / state and non-state Request for Single Stage - One Procurement of Station Wagon IDA / 57670 Post Open - National 95,000.00 92,500.00 Signed 2019-12-25 2020-02-19 2020-01-24 2020-08-17 institutions and producer Quotations Envelope Vehicle organizations SL-MAFS-170581-GO-RFQ / Procurement of 250Mt of NPK Under Contingency Emergency Request for Single Stage - One 15:15:15 and 150Mt of Urea IDA / 57670 Post Limited 440,000.00 410,297.40 Implementati 2020-05-04 2020-04-30 2020-06-29 2020-05-21 2020-12-26 2020-08-31 Response Quotations Envelope fertiliser (Emergency COVID- on 19) SL-MAFS-170583-GO-RFQ / Procurement of assorted Contingency Emergency Request for Single Stage - One IDA / 57670 Post Limited 15,000.00 32,261.58 Signed 2020-05-04 2020-04-29 2020-06-29 2020-05-15 2020-12-26 personal protective equipment Response Quotations Envelope (Emergency COVID-19) SL-MAFS-171281-GO-RFQ / Pending Procurement of 5 tones of Contingency Emergency Request for Single Stage - One IDA / 57670 Post Limited 75,000.00 0.00 Implementati 2020-05-05 2020-06-30 2020-12-27 folia organic fertilizer Response Quotations Envelope on (Emergency COVID-19) SL-MAFS-178202-GO-RFQ / Pending Contingency Emergency Request for Single Stage - One Procurement of 2,500 litres of IDA / 57670 Post Limited 35,000.00 0.00 Implementati 2020-06-13 2020-08-08 2021-02-04 Response Quotations Envelope selective herbicides on SL-MAFS-184387-GO-RFQ / Support to agribusiness- Procurement of seeds Pending farmer linkages and SMEs Request for Single Stage - One (312.5kg of onion) to support IDA / 57670 Post Limited 40,000.00 0.00 Implementati 2020-07-25 2020-09-19 2021-03-18 along selected agricultural Quotations Envelope smallholder farmers on value chains particularly women SL-MAFS-184389-GO-RFQ / Support to agribusiness- Pending Procurement of Fertilizer farmer linkages and SMEs Request for Single Stage - One IDA / 57670 Post Limited 60,000.00 0.00 Implementati 2020-07-25 2020-09-19 2021-03-18 (12Mt - NPK and 25Mt of along selected agricultural Quotations Envelope on Urea) and agrochemicals value chains Page 3 SL-MAFS-184399-GO-RFQ / Capacity Building support for Procurement of equipment to state and non-state Request for Single Stage - One Upgrade of MAF network to IDA / 57670 Post Limited 50,000.00 27,972.89 Signed 2020-07-25 2020-09-09 2020-09-19 2020-10-02 2021-03-18 institutions and producer Quotations Envelope enable all e-platforms to run organizations effectively SL-MAFS-184401-GO-RFQ / Capacity Building support for Procurement of quality control Pending state and non-state Request for Single Stage - One and grading equipment for a IDA / 57670 Post Limited 20,000.00 0.00 Implementati 2020-07-25 2020-09-19 2021-03-18 institutions and producer Quotations Envelope cocoa bean quality testing lab on organizations in Kenema SL-MAFS-184411-GO-RFQ / Procurement of office equipment support to the Capacity Building support for Multilateral Projects Division state and non-state Request for Single Stage - One of the Ministry of Finance and IDA / 57670 Post Limited 50,000.00 41,077.26 Signed 2020-07-25 2020-08-03 2020-09-19 2020-08-20 2021-03-18 institutions and producer Quotations Envelope Sierra Leone Roads Authority organizations (SLRA) (Feeder Roads and Asset Management Department. SL-MAFS-170582-GO-DIR / Procurement of 10 Mini Under Contingency Emergency Request for Single Stage - One Combined harvesters, 4 rice IDA / 57670 Post Limited 182,828.00 166,545.45 Implementati 2020-05-04 2020-06-16 2020-06-29 2020-07-06 2020-12-26 2021-04-26 Response Quotations Envelope rippers and 4 threshers on (Emergency COVID-19) SL-MAFS-201798-GO-RFQ / Procurement of grading Capacity Building support for equipment for the Produce state and non-state Request for Single Stage - One Monitoring Board to enhances IDA / 57670 Post Limited 25,000.00 21,602.55 Signed 2020-11-04 2020-10-30 2020-12-30 2020-11-19 2021-06-28 institutions and producer Quotations Envelope quality of Sierra Leone Cocoa organizations Beans exported to meet best international standards SL-MAFS-173624-GO-RFQ / Procurement of 13 units Motorcycle 125cc with 2pcs Project Management, Request for Single Stage - One IDA / 57670 Post Limited 54,000.00 56,603.47 Signed 2020-05-24 2020-11-02 2020-07-19 2020-11-23 2021-01-15 full face crash helmet, (for 3 Monitoring and Evaluation Quotations Envelope remaining LCs, 8 for SLPMB Districts Extension Officer) SL-MAFS-216649-GO-RFQ / Procurement of a drone for aerial data collection -area measurement of large farms Pending Request for Single Stage - One for Planning ,Evaluation, IDA / 57670 Market Access Improvement Post Limited 10,000.00 0.00 Implementati 2021-02-23 2021-04-20 2021-10-17 Quotations Envelope Monitoring and Statistics on Development (PEMSD) of Ministry of Agriculture & Forestry. SL-MAFS-216387-GO-RFQ / Support to agribusiness- Pending procurement of Experimental farmer linkages and SMEs Request for Single Stage - One IDA / 57670 Post Limited 20,000.00 0.00 Implementati 2021-02-23 2021-04-20 2021-10-17 Poultry and Poultry drinkers along selected agricultural Quotations Envelope on and feeders value chains SL-MAFS-227707-GO-RFQ / Procurement of furniture for Capacity Building support for Pending the Interactive Voice Response state and non-state Request for Single Stage - One IDA / 57670 Post Limited 7,000.00 0.00 Implementati 2021-05-01 2021-06-26 2021-12-23 (IVR) Call Center at the institutions and producer Quotations Envelope on Ministry of Agriculture and organizations Forestry SL-MAFS-231517-GO-RFQ / Procurement of computers , printers, gateway ,server , Capacity Building support for Pending inverters and accessories for state and non-state Request for Single Stage - One IDA / 57670 Post Limited 98,750.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 SCADeP and the Interactive institutions and producer Quotations Envelope on Voice Response Center at the organizations Ministry of Agriculture & Agriculture NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MAFS-38589-NC-RFQ / Project Management, Request for Single Stage - One Website Development, IDA / 57670 Post Limited 35,000.00 16,330.82 Signed 2018-11-28 2018-05-30 2019-01-23 2018-06-15 2019-07-22 Monitoring and Evaluation Quotations Envelope Hosting and Management SL-MAFS-38591-NC-RFQ / Produce IEC activities- Printing of IEC Materials, Under Project Management, Request for Single Stage - One Jingles, Vignette, T-Shirts, IDA / 57670 Post Limited 95,000.00 0.00 Implementati 2018-12-05 2018-10-24 2019-01-30 2019-07-29 Monitoring and Evaluation Quotations Envelope stickers, hand bands, flyers, on banners, brochures,2019 Calendars and Diaries SL-MAFS-113062-NC-RFQ / Request for Single Stage - One Development of Web-based IDA / 57670 Market Access Improvement Post Limited 80,000.00 78,602.28 Completed 2019-05-19 2019-05-21 2019-07-14 2019-06-05 2020-01-10 2021-04-28 Quotations Envelope Electronic Dashboard Platform SL-MAFS-113069-NC-RFQ / Production and printing of GIS Project Management, Request for Single Stage - One maps of SCADeP supported IDA / 57670 Post Limited 10,000.00 8,728.46 Signed 2019-05-22 2019-06-18 2019-07-17 2019-07-02 2020-01-13 Monitoring and Evaluation Quotations Envelope Agribusinesses and SMEs and FBOs SL-MAFS-130059-NC-RFQ / Develop a portal hosted locally on a server to capture Capacity Building support for data on Trade Information, state and non-state Request for Single Stage - One IDA / 57670 Post Open - National 25,000.00 28,749.77 Signed 2019-09-23 2019-11-18 2019-10-08 2020-05-16 agri-business, related trade institutions and producer Quotations Envelope statistics, and to disseminate organizations same to exporters, Investors and researchers SL-MAFS-38592-NC-RFQ / Project Management, Request for Single Stage - One Printing of quarterly SCADeP- IDA / 57670 Post Limited 40,000.00 0.00 Canceled 2019-02-20 2019-04-17 2019-10-14 Monitoring and Evaluation Quotations Envelope News Letters Page 4 SL-MAFS-170591-NC-DIR / Plowing,Harrowing,and Seed Harrowing of 1,370Ha of land in 17 farm locations across Pending Contingency Emergency eight districts (Tonkolili, IDA / 57670 Post Direct Selection Direct 357,142.86 0.00 Implementati 2020-04-29 2020-05-04 2020-06-08 2020-12-05 Response Kono, Kailahun, Koinadugu, on Karene, Port Loko, WARD and Kambia) (Emergency COVID 19) SL-MAFS-170589-NC-RFQ / Plowing, Harrowing, and Seed Harrowing of 1,130Ha of land Pending for cultivation of farmers in Contingency Emergency Request for Single Stage - One IDA / 57670 Post Limited 308,673.47 0.00 Implementati 2020-05-04 2020-06-29 2020-12-26 15 farm locations across four Response Quotations Envelope on districts (Tonkolili, Moyamba, Pujehun, and Kambia) (Emergency COVID-19) SL-MAFS-173928-NC-RFQ / Capacity Building support for Pending Non-Consultancy Services for state and non-state Request for Single Stage - One IDA / 57670 Post Limited 16,000.00 0.00 Implementati 2020-05-26 2020-07-21 2021-01-17 Maintenance Services for the institutions and producer Quotations Envelope on Electronic Dash Board System organizations SL-MAFS-184392-NC-RFQ / Non-Consulting services for Capacity Building support for Setting up of a GIS system in Pending state and non-state Request for Single Stage - One MAF to help coordinate IDA / 57670 Post Limited 25,000.00 0.00 Implementati 2020-07-25 2020-09-19 2021-03-18 institutions and producer Quotations Envelope interventions and provide on organizations timely information to management and field staff SL-MAFS-184395-NC-RFQ / Non-Consulting services to Capacity Building support for Upgrade MAF Website to Pending state and non-state Request for Single Stage - One ensure that the AMIS, E- IDA / 57670 Post Limited 25,000.00 0.00 Implementati 2020-07-25 2020-09-19 2021-03-18 institutions and producer Quotations Envelope extension and all other E- on organizations Systems of MAF are easily accessible SL-MAFS-184380-NC-RFQ / Non Consulting Services for development of an E- Project Management, Request for Single Stage - One Extension platform that IDA / 57670 Post Limited 81,860.00 0.00 Canceled 2020-07-25 2020-09-19 2021-03-18 Monitoring and Evaluation Quotations Envelope includes interactive voice Response (IVR) and SMS text messaging CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MAFS-46903-CS-QCBS / Consulting services for the monitoring and supervision of works for selected feeder Quality And Cost- roads (300km) using IDA / 57670 Market Access Improvement Prior Open - International 1,338,000.00 0.00 Under Review 2018-07-02 2018-07-23 2018-09-05 2018-10-03 2018-11-02 2018-12-07 2019-01-11 2020-01-11 Based Selection Traditional contracts with two (2) years community based maintenance in Sierra Leone . SL-MAFS-39259-CS-CQS / Capacity Building support for Consultancy Services for the Consultant state and non-state Preparation of the National IDA / 57670 Post Qualification Open - National 60,000.00 0.00 Canceled 2018-09-14 2018-10-05 2018-11-18 2018-12-18 2019-01-22 2019-07-21 institutions and producer Agribusiness Development Selection organizations Strategy SL-MAFS-46900-CS-QCBS / Consulting services for the monitoring and supervision of Quality And Cost- works for selected feeder IDA / 57670 Market Access Improvement Prior Open - International 1,125,000.00 0.00 Under Review 2018-08-31 2018-09-21 2018-11-04 2018-12-02 2019-01-01 2019-02-05 2019-03-12 2020-03-11 Based Selection roads (200km) using Output and Performance-based Road Contract (OPRC). SL-MAFS-73206-CS-CQS / Support to agribusiness- Consultancy Services to Consultant farmer linkages and SMEs undertake Capacity needs IDA / 57670 Post Qualification Open - National 60,000.00 0.00 Under Review 2018-08-31 2018-09-21 2018-11-04 2018-12-04 2019-01-08 2019-07-07 along selected agricultural Assessment of Grantees of the Selection value chains SLADF SL-MAFS-73210-CS-CQS / Technical Audit of the Feeder Roads Component of the Consultant Smallholder IDA / 57670 Market Access Improvement Post Qualification Open - National 100,000.00 0.00 Canceled 2018-09-14 2018-10-05 2018-11-18 2018-12-18 2019-01-22 2019-07-21 Commercialization and Selection Agribusiness Development Project (SCADeP) SL-MAFS-46925-CS-CQS / Consulting services to review Consultant and update National Rural IDA / 57670 Market Access Improvement Post Qualification Open - National 200,000.00 0.00 Canceled 2018-11-22 2018-12-13 2019-01-26 2019-02-25 2019-04-01 2019-09-28 Feeder Roads Policy, including Selection alternative revenue sources for RMFA. SL-MAFS-46921-CS-CQS / Consultancy services to Consultant establish Asset Management IDA / 57670 Market Access Improvement Post Qualification Open - National 295,000.00 0.00 Canceled 2018-11-30 2018-12-21 2019-02-03 2019-03-05 2019-04-09 2019-10-06 Systems at SLRA, including Selection trainng and installation of equipment and software . SL-MAFS-80463-CS-CQS / Consultancy Services to Capacity Building support for Consultant undertake an institutional state and non-state Under IDA / 57670 Post Qualification Open - National 94,000.00 0.00 2018-11-15 2018-08-06 2018-12-06 2019-01-19 2018-08-23 2019-02-18 2018-09-20 2019-03-25 2019-09-21 diagnostic of the Ministry of institutions and producer Implementation Selection Agriculture and Forestry organizations (MAF). Page 5 SL-MAFS-91284-CS-QCBS / Consulting Services for Contract Monitoring and Supervision of Rehabilitation Quality And Cost- Under of 142Km of Feeder Roads in IDA / 57670 Market Access Improvement Post Open - National 350,000.00 0.00 2018-12-19 2018-12-19 2019-01-09 2018-12-21 2019-02-22 2019-03-22 2019-04-21 2019-05-26 2019-06-30 2020-06-29 Based Selection Implementation Six (6) Districts (Bonthe, Port Loko, Kailahun, Moyamba, Tonkolili and Kono) in Sierra Leone SL-MAFS-97039-CS-LCS / Consulting Services to Project Management, Least Cost Under IDA / 57670 Post Open - National 30,000.00 0.00 2019-02-04 2019-05-22 2019-02-25 2019-04-10 2019-05-08 2019-06-07 2019-07-12 2019-08-16 2020-02-12 conduct Financial Audit for FY Monitoring and Evaluation Selection Implementation 2018 for SCADeP SL-MAFS-121003-CS-QCBS / CONSULTING SERVICES FOR FEASIBILITY STUDIES, PREPARATION OF CONCEPTUAL DESIGNS, PROCUREMENT SUPPORT, Quality And Cost- IDA / 57670 Market Access Improvement Prior Open - International 1,500,000.00 1,836,875.91 Signed 2019-06-26 2019-06-27 2019-07-17 2019-06-28 2019-08-30 2019-09-11 2019-09-27 2019-10-16 2019-10-27 2019-11-07 2019-12-01 2020-10-15 2020-01-05 2020-11-09 2021-01-04 MONITORING AND Based Selection SUPERVISION SERVICES FOR CONSTRUCTION OF 7 BRIDGES IN SIERRA LEONE USING DESIGN, BUILD TRANSFER (DBT) CONTRACTING SL-MAFS-168913-CS-LCS / Consulting services to Project Management, Least Cost Pending IDA / 57670 Post Open - National 30,000.00 0.00 2020-04-16 2020-05-07 2020-06-20 2020-07-18 2020-08-17 2020-09-21 2020-10-26 2021-04-24 conduct Financial Audit for FY Monitoring and Evaluation Selection Implementation 2O19 for SCADeP SL-MAFS-216300-CS-LCS / Hiring of an Auditing firm for Project Management, Least Cost Under IDA / 57670 Post Open - National 50,000.00 0.00 2021-02-11 2021-05-27 2021-03-04 2021-04-17 2021-05-15 2021-06-14 2021-07-19 2021-08-23 2022-02-19 the financial audit of SCADeP Monitoring and Evaluation Selection Implementation for 2020 fiscal year SL-MAFS-113058-CS-CQS / Support to agribusiness- Consultancy services to Consultant farmer linkages and SMEs develop and establish IDA / 57670 Post Qualification Open - National 250,000.00 0.00 Canceled 2019-05-14 2019-06-04 2019-07-18 2019-08-17 2019-09-21 2020-03-19 along selected agricultural Electronic Input Voucher Selection value chains Platform SL-MAFS-216355-CS-CQS / Hiring of Engineering firm to conduct Technical Audit of Consultant Feeder Roads IDA / 57670 Market Access Improvement Post Qualification Open - National 50,000.00 0.00 Canceled 2021-09-20 2021-10-11 2021-11-24 2021-12-24 2022-01-28 2022-07-27 constructed/rehabilitated/imp Selection roved under the SCADeP project INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MAFS-46945-CS-INDV / Capacity Building support for Consultancy services to Individual state and non-state Under conduct value chain IDA / 57670 Post Consultant Limited 45,000.00 0.00 2018-10-01 2018-06-06 2018-10-06 2018-06-18 2018-10-27 2018-07-03 2018-12-01 2019-05-30 institutions and producer Implementation development studies Selection organizations (horticulture). SL-MAFS-39249-CS-INDV / Consulting services to review Capacity Building support for CAP 185 and harmonization Individual state and non-state of existing regulations with IDA / 57670 Post Consultant Limited 12,000.00 0.00 Under Review 2018-07-16 2018-07-06 2018-07-21 2018-08-11 2018-09-15 2019-03-14 institutions and producer other producing countries and Selection organizations adopting international best practice for SLPMB SL-MAFS-46710-CS-INDV / Support to agribusiness- Consulting services to Individual farmer linkages and SMEs Under undertake evaluation of IDA / 57670 Post Consultant Limited 30,000.00 0.00 2018-05-31 2018-06-06 2018-06-05 2018-06-21 2018-06-26 2018-07-02 2018-07-31 2019-01-27 along selected agricultural Implementation business plans prepared by Selection value chains the FBOs/SMEs. SL-MAFS-39262-CS-LCS / Consulting Services to Project Management, IDA / 57670 Prior Direct Selection Direct 30,000.00 0.00 Canceled 2018-05-30 2018-06-09 2018-08-13 2019-02-09 Conduct Financial Audit for FY Monitoring and Evaluation 2017 for SCADeP SL-MAFS-48929-CS-INDV / Support to agribusiness- Consulting Services to Assess Individual farmer linkages and SMEs safagurads status of approved IDA / 57670 Post Consultant Limited 15,000.00 0.00 Under Review 2018-09-28 2018-10-03 2018-10-24 2018-11-28 2019-05-27 along selected agricultural ASMG FBOs and SMEs and Selection value chains prepare ESMPs as required SL-MAFS-48893-CS-INDV / Individual Consultancy services to IDA / 57670 Market Access Improvement Post Consultant Limited 25,000.00 0.00 Canceled 2018-05-31 2018-06-05 2018-06-26 2018-07-31 2019-01-27 undertake hydrologic studies Selection for positioning of water wells. SL-MAFS-49231-CS-INDV / Capacity Building support for Consulting service for the Individual state and non-state design and supervision of IDA / 57670 Post Consultant Limited 15,000.00 0.00 Canceled 2018-11-30 2018-12-05 2018-12-26 2019-01-30 2019-07-29 institutions and producer construction of NaFFSLoffice Selection organizations Building SL-MAFS-39280-CS-INDV / Support to agribusiness- Consulting services to review Individual farmer linkages and SMEs Apex Bank's structure and IDA / 57670 Post Consultant Limited 30,000.00 0.00 Canceled 2018-06-01 2018-06-06 2018-06-27 2018-08-01 2019-01-28 along selected agricultural instruments for agriculture Selection value chains financing SL-MAFS-39219-CS-INDV / Consulting services to conduct hydrological and Individual hydraulic studies to determine IDA / 57670 Market Access Improvement Post Consultant Limited 50,000.00 0.00 Canceled 2018-07-02 2018-07-07 2018-07-28 2018-09-01 2019-02-28 water quality,availability and Selection reliability for construction of water wells for supported FBOs Page 6 SL-MAFS-39293-CS-CDS / Consulting services for Capacity Building support for Technical Assistance to state and non-state IDA / 57670 Prior Direct Selection Direct 47,000.00 0.00 Canceled 2018-11-19 2018-11-29 2019-02-02 2019-08-01 establish elite cocoa clones or institutions and producer Kenema Forestry and Tree organizations Crops Research Cente SL-MAFS-46929-CS-INDV / Individual Consultancy services for TA to IDA / 57670 Market Access Improvement Post Consultant Limited 40,000.00 0.00 Canceled 2018-11-28 2018-12-03 2018-12-24 2019-01-28 2019-07-27 establish an AMIS. Selection SL-MAFS-46947-CS-INDV / Individual Consulting Services to Project Management, IDA / 57670 Post Consultant Limited 50,000.00 0.00 Canceled 2018-11-26 2018-12-01 2018-12-22 2019-01-26 2019-07-25 Establish Social Accountability Monitoring and Evaluation Selection Framework SL-MAFS-46722-CS-INDV / Support to agribusiness- Consultancy services for TA to Individual farmer linkages and SMEs establish Input voucher IDA / 57670 Post Consultant Limited 50,000.00 0.00 Canceled 2018-11-29 2018-12-04 2018-12-25 2019-01-29 2019-07-28 along selected agricultural scheme and training of agro- Selection value chains input dealers SL-MAFS-46720-CS-INDV / Support to agribusiness- Individual Consulting services to develop farmer linkages and SMEs IDA / 57670 Post Consultant Limited 50,000.00 0.00 Canceled 2018-11-30 2018-12-05 2018-12-26 2019-01-30 2019-07-29 training modules and train along selected agricultural Selection FBOs/SMEs value chains SL-MAFS-46927-CS-INDV / Consulting services to review Individual the road maintenance plan of IDA / 57670 Market Access Improvement Post Consultant Limited 80,000.00 0.00 Canceled 2018-11-30 2018-12-05 2018-12-26 2019-01-30 2019-07-29 local councils and build their Selection capacity to prepare a four year plan. SL-MAFS-133853-CS-INDV / Consulting Services to set up Web based,Management Individual Project Management, Under Information System, (MIS) IDA / 57670 Post Consultant Open 30,000.00 0.00 2019-10-02 2019-10-10 2019-11-20 2019-12-11 2020-01-15 2020-07-13 Monitoring and Evaluation Implementation develop a user manual and Selection train key staff on how to use the MIS . SL-MAFS-133841-CS-INDV / Individual Consulting services for Project Management, Under IDA / 57670 Post Consultant Open 72,000.00 0.00 2019-09-25 2019-09-17 2019-11-13 2019-12-04 2020-01-08 2020-07-06 recruitment of a Value Chain Monitoring and Evaluation Implementation Selection Development Specialist SL-MAFS-134163-CS-INDV / Consulting Services for Individual Project Management, Pending recruitment of Environmental, IDA / 57670 Post Consultant Open 72,000.00 0.00 2019-10-02 2019-11-20 2019-12-11 2020-01-15 2020-07-13 Monitoring and Evaluation Implementation Social and Safeguards Selection Specialist SL-MAFS-216275-CS-INDV / Hiring of Consultant for Development of Project Individual Project Management, Pending Procurement Strategy For IDA / 57670 Post Consultant Limited 20,000.00 0.00 2021-02-15 2021-02-20 2021-03-13 2021-04-17 2021-10-14 Monitoring and Evaluation Implementation Development for the West Selection Africa Food System Resilient Program SL-MAFS-216277-CS-INDV / Hiring of a Consultant for the Individual Preparation of the Project Project Management, Pending IDA / 57670 Post Consultant Limited 20,000.00 0.00 2021-02-09 2021-02-14 2021-03-07 2021-04-11 2021-10-08 Implementation Manual (PIM) Monitoring and Evaluation Implementation Selection for the West Africa Food System Resilient Program SL-MAFS-216292-CS-INDV / Hiring of a Consultant to Individual Project Management, Pending conduct baseline studies for IDA / 57670 Post Consultant Limited 45,000.00 0.00 2021-03-18 2021-03-23 2021-04-13 2021-05-18 2021-11-14 Monitoring and Evaluation Implementation the West Africa Food System Selection Resilient Program SL-MAFS-216294-CS-INDV / Hiring of a Consultant to Individual Project Management, Pending establish social accountability IDA / 57670 Post Consultant Limited 50,000.00 0.00 2021-02-26 2021-03-03 2021-03-24 2021-04-28 2021-10-25 Monitoring and Evaluation Implementation framework for SCADeP Selection activities SL-MAFS-216296-CS-INDV / Individual Hiring of a Consultant to Project Management, Pending IDA / 57670 Post Consultant Limited 12,000.00 0.00 2021-03-16 2021-03-21 2021-04-11 2021-05-16 2021-11-12 prepare Gender Needs Monitoring and Evaluation Implementation Selection Assessment and Action plan SL-MAFS-216320-CS-INDV / Hiring of a consultant for the development of an E- Individual Project Management, Under Extension platform that IDA / 57670 Post Consultant Limited 80,000.00 0.00 2021-02-16 2021-03-17 2021-02-21 2021-03-14 2021-04-18 2021-10-15 Monitoring and Evaluation Implementation includes interactive voice Selection Response (IVR) and SMS text messages SL-MAFS-216361-CS-INDV / Hiring of a consultant to Individual conduct studies identifying Pending IDA / 57670 Market Access Improvement Post Consultant Limited 50,000.00 0.00 2021-03-22 2021-03-27 2021-04-17 2021-05-22 2021-11-18 alternative sources of funding Implementation Selection to Road Maintenance Fund Administration (RMFA) SL-MAFS-216367-CS-INDV / Hiring of consultant for the Individual production of GIS maps of Project Management, Pending IDA / 57670 Post Consultant Limited 10,000.00 0.00 2021-05-19 2021-05-24 2021-06-14 2021-07-19 2022-01-15 the locations of SCADeP Monitoring and Evaluation Implementation Selection supported grantees ( 2nd & other interventions) SL-MAFS-216386-CS-INDV / Capacity Building support for Individual Hiring of consultant to set-up state and non-state Pending IDA / 57670 Post Consultant Limited 15,000.00 0.00 2021-04-15 2021-04-20 2021-05-11 2021-06-15 2021-12-12 an agribusiness data institutions and producer Implementation Selection management system organizations Page 7 SL-MAFS-216640-CS-INDV / Hiring of a consultant to develop Environmental and Social Management Plans (ESMP) and other safeguard Individual Project Management, Under tools as required for Spot IDA / 57670 Post Consultant Limited 25,000.00 0.00 2021-02-04 2021-03-02 2021-02-09 2021-03-02 2021-04-06 2021-10-03 Monitoring and Evaluation Implementation Improvement (including Selection construction of bridges, culverts and embankments) in five districts (Port Loko, Kambia, Bombali, K SL-MAFS-217090-CS-INDV / Hiring of a Consultant for the Individual development of Resettlement Project Management, Under IDA / 57670 Post Consultant Limited 25,000.00 0.00 2021-02-03 2021-02-03 2021-02-08 2021-03-01 2021-04-05 2021-10-02 Policy Framework (RSP) for Monitoring and Evaluation Implementation Selection the West Africa Food System Resilient Program SL-MAFS-217091-CS-INDV / Hiring of a consultant for the Development of a Pest and Individual Project Management, Under Pesticides Management Plan IDA / 57670 Post Consultant Limited 25,000.00 0.00 2021-02-03 2021-02-03 2021-02-08 2021-03-01 2021-04-05 2021-10-02 Monitoring and Evaluation Implementation (PPMP) for the West Africa Selection Food System Resilient Program SL-MAFS-216314-CS-INDV / Hiring of a consultant to Individual review and update procedural Project Management, Pending IDA / 57670 Post Consultant Limited 17,000.00 0.00 2021-02-23 2021-02-28 2021-03-21 2021-04-25 2021-10-22 manuals for SLADF grantees Monitoring and Evaluation Implementation Selection as specified in the TANA Report SL-MAFS-216316-CS-INDV / Hiring of a Consultant to review applications and business plans of potential Individual Agribusiness Service Matching Project Management, Under IDA / 57670 Post Consultant Limited 60,000.00 0.00 2021-02-28 2021-03-17 2021-03-05 2021-03-26 2021-04-30 2021-10-27 Grants (ASMG) beneficiaries Monitoring and Evaluation Implementation Selection and make recommendations for shortlisting and approval in the first and second stages respectively. SL-MAFS-217096-CS-INDV / Hiring of a Consultant for the development of an Individual Environmental and Social Project Management, Under IDA / 57670 Post Consultant Limited 25,000.00 0.00 2021-02-03 2021-02-03 2021-02-08 2021-03-01 2021-04-05 2021-10-02 Management Framework Monitoring and Evaluation Implementation Selection (ESMF) for the West Africa Food System Resilient Program SL-MAFS-217093-CS-INDV / Hiring of a Consultant for the development of Stakeholder Engagement Plan(SEP), Labor Individual Project Management, Under and Management Plan (LMP) , IDA / 57670 Post Consultant Limited 25,000.00 0.00 2021-02-03 2021-02-03 2021-02-08 2021-03-01 2021-04-05 2021-10-02 Monitoring and Evaluation Implementation and Environmental and Social Selection Commitment Plan (ESCP) for the West Africa Food System Resilient Program SL-MAFS-217120-CS-INDV / Hiring of a consultant for the Individual provision of accounting Project Management, Pending IDA / 57670 Post Consultant Limited 37,000.00 0.00 2021-02-25 2021-03-02 2021-03-23 2021-04-27 2021-10-24 software and conduct training Monitoring and Evaluation Implementation Selection on the use of the Software for SLADF grantees SL-MAFS-39251-CS-INDV / Capacity Building support for Individual Consulting Services to state and non-state IDA / 57670 Post Consultant Limited 24,000.00 0.00 Canceled 2018-08-30 2018-09-04 2018-09-25 2018-10-30 2019-04-28 conduct training of Quality institutions and producer Selection Control Unit staff for SLPMB organizations SL-MAFS-218938-CS-INDV / Individual Hiring of a Consultant for the Project Management, Under IDA / 57670 Post Consultant Limited 25,000.00 0.00 2021-02-15 2021-03-03 2021-02-20 2021-03-13 2021-04-17 2021-10-14 development of Safeguard Monitoring and Evaluation Implementation Selection digital platform SL-MAFS-227703-CS-INDV / Hiring of a Consultant to prepare final completion Individual Contingency Emergency Under report of the implementation IDA / 57670 Post Consultant Limited 75,000.00 0.00 2021-04-08 2021-05-04 2021-04-13 2021-05-04 2021-06-08 2021-12-05 Response Implementation of the Contingency Selection Emergency Response to the COVID -19 SL-MAFS-227705-CS-INDV / Hiring of a Consultant to Individual conduct an Environmental Under IDA / 57670 Market Access Improvement Post Consultant Limited 25,000.00 0.00 2021-04-12 2021-05-04 2021-04-17 2021-05-08 2021-06-12 2021-12-09 Audit for the Rehabilitation of Implementation Selection the 142km feeder roads under SCADeP SL-MAFS-216358-CS-INDV / Individual Hiring of a Consultant to IDA / 57670 Market Access Improvement Post Consultant Limited 70,000.00 0.00 Canceled 2021-02-24 2021-04-26 2021-03-01 2021-03-22 2021-04-26 2021-10-23 review the National Feeder Selection Roads Policy Page 8 Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: Original, December 2016; Revision 1 of Updated Procurement Plan, February 2017. 2. Date of General Procurement Notice: Not Applicable 3. Period covered by this procurement plan: From June 2017 to June 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. NCB (Works) From US$ 15 million All 2. NCB (Goods and Non- From US$ 4 million All Consulting Services) 3. Shopping (Works) None None 4. Shopping (Goods and Non- None None Consulting Services) 5. Direct Contracting (Works) From US$ 15 million All Direct Contracting (Goods From US$ 4 million All and Non-Consulting Services) 6. Community Participation None None 2. Prequalification. Bidders for Not applicable shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.19 of the Guidelines: The Operations Manual describes the methods and procedures applicable to the Community Participation under CDD Component and Subprojects. 4. Reference to (if any) Project Operational/Procurement Manual: The Operations Manual issued by the Alternative Agriculture Center of the North of Minas Gerais State (Project Implementation Unit) describes the methods and procedures applicable to all procurement of goods, July 9, 2010 works, non-consulting services and consulting services financed by the Grant Agreement # TF018765. 5. Any Other Special Procurement Arrangements: Not Applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior/Pos US$ rence t) million (yes/ no) 1 Summary 0.18 1 No Post of the NCBs (Non- Consulting Services) 2 Summary 0.05 10 No Post of the Shoppings (Goods) 3 Summary 0.24 20 No Post of the Shoppings (Non- Consulting Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) From US$ 2 million All 2. Single Source Selection (Firms) From US$ 2 million All 3. Individual Consultant From US$ 400,000 All 4 Single Source Selection From US$ 400,000 All (Individuals) 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 1,500,000 equivalent per contract, may comprise entirely of national consultants in July 9, 2010 accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million 1 Summary 0.01 3 Post IC of number of contracts that will be let under methods other than QCBS July 9, 2010 PROCUREMENT Brazil : BR DGM for Indigenous People and Traditional Communities PLAN General Information Country: Brazil Bank’s Approval Date of the Original Procurement Plan: 2016-12- 12 2021-05- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P143492 GPN Date: 27 2017-06- Project Name: BR DGM for Indigenous People and Traditional Communities 23 Loan / Credit No: TF / 18765 Alternative Agriculture Center of the North of Minas Gerais State Executing Agency(ies): WORKS Procure Bid Evaluation Activity Reference No. Actual Draft Pre- Draft Bidding Specific Proposal Loan / Credit Market Procurement Prequalificati High SEA/SH ment Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount qualification Document / Procurement Notice Submission / Signed Contract No. Approach Process on (Y/N) Risk Docume Status Evaluation Report as Issued Recommendation Completion (US$) Documents Justification / Invitation Opening / Minutes nt Type for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne Actu d al SUB 55-12 / CT55.12 Patio para a instalacao do conjunto modular com 70 metros quadrado em piso Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017- de concreto. Base estrutural TF / 18765 and Adaptive Community Post Limited 0.00 Implemen Quotations Envelope 27 25 10-23 com cobertura baneiro Initiatives tation vestuario em alvenaria instalacao de esgoto sanitario e cercamento do perimetro SUB 61-17 / CQ61.17 Contratação de serviços de Component 1: Sustainable 2019- Request for Single Stage - One Complete 2017-07- 2019-04- 2017-07- 2019-05- 2017- reforma do prédio onde sera TF / 18765 and Adaptive Community Post Limited 8,847.95 11- Quotations Envelope d 07 17 31 17 10-29 instalado a unidade de Initiatives 27 beneficiamento SUB 212-4 / Serviço de Component 1: Sustainable 2020- Obra civil de construção da Request for Single Stage - One 13,219.5 Complete 2019-11- 2019-11- 2019-12- 2020-01- 2020- TF / 18765 and Adaptive Community Post Limited 05- cozinha comunitária, Quotations Envelope 6 d 24 26 14 02 03-13 Initiatives 15 incluindo mão de obra e materiais SUB 166 SC 11/2019 / Serviço de obra civil de Component 1: Sustainable Under Request for Single Stage - One 22,457.9 2019-12- 2021-01- 2020-01- 2020- construção da Cozinha TF / 18765 and Adaptive Community Post Limited Implemen Quotations Envelope 2 14 21 03 04-02 Comunitária, incluindo mão Initiatives tation de obra e materiais GOODS Activity Reference No. Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual BR-CAA-3305-GO-RFQ / aquisicao de quarenta e um tablets para uso dos Component 1: Sustainable Pending Request for Single Stage - One 2016-12- 2017-01- 2017-03- subprojetos para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 21 13 14 acompanhamento e Initiatives ation monitoramento dos subprojetos BR-CAA-3264-GO-RFQ / aquisicao de televisor smart Component 3: Project Pending tv sessenta e cinco Request for Single Stage - One 2017-02- 2017-03- 2017-05- TF / 18765 Management, Monitoring Post Limited 0.00 Implement polegadas e curva para Quotations Envelope 13 06 05 and Evaluation ation transmissao audio visual para estruturacao da sala reunioes projeto BR-CAA-4664-GO-RFQ / aquisicao de material pedagogico tipo bloco e Component 3: Project Pending papel e caneta e papel sufite Request for Single Stage - One 2015-12- 2015-12- 2016-02- TF / 18765 Management, Monitoring Post Limited 0.00 Implement para impressao e pasta Quotations Envelope 01 23 21 and Evaluation ation papel para realizar uma reuniao anual e duas extraordinaria do comite gestor nacional BR-CAA-4669-GO-RFQ / aquisicao de material pedagogico tipo canetas e Component 1: Sustainable Pending Request for Single Stage - One 2016-01- 2016-02- 2016-04- papel para realizacao de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 11 03 03 tres oficinas de divulgacao e Initiatives ation duas de elaboracao e tres seminarios BR-CAA-4663-GO-RFQ / aquisicao de seis computadores para equipe chave e assessora do Component 3: Project projeto e uma impressora Request for Single Stage - One 2016-02- 2016-02- 2016-04- 2016-04- 2016-06- TF / 18765 Management, Monitoring Post Limited 5,396.72 Signed multifuncional para o Quotations Envelope 18 08 08 08 07 and Evaluation escritorio do projeto situado em brasilia para desenvolvimento das atividades BR-CAA-4666-GO-RFQ / aquisicao de vinte tablets para uso da equipe chave de Component 3: Project apoio e estagiarios durante Request for Single Stage - One 2016-06- 2016-06- 2016-06- 2016-06- 2016-08- 2016-08- TF / 18765 Management, Monitoring Post Limited 6,367.03 Completed monitoramento do projeto e Quotations Envelope 03 03 20 20 19 20 and Evaluation aquiscao de cabo para equipamentos audivisuais durante reunioes do projeto BR-CAA-5585-GO-RFQ / Aquisição de material pedagógico para duas oficinas de elaboração de Component 1: Sustainable projetos, tipo: pincel, Request for Single Stage - One 2017-01- 2017-01- 2017-01- 2017-01- 2017-01- 2017-01- TF / 18765 and Adaptive Community Post Limited 437.58 Completed hidrocor, canetas Quotations Envelope 13 17 17 18 22 20 Initiatives hidrográficas coloridas grossas, kits de tintas com pinceis, papel tipo oficio, rolo de papel kraft, rolo de fita adesiva, rolo de barbante, etc BR-CAA-3252-GO-RFQ / Aquisição de 24 poltronas com estrutura de assento e encosto em forma de Component 3: Project Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- concha inteiriça resistente a TF / 18765 Management, Monitoring Post Limited 0.00 Implement Quotations Envelope 27 16 14 120kg, sem braço, base em and Evaluation ation aço, revestimento de encosto e assento em couro sintético para sala reuniões DGM. BR-CAA-17780-GO-RFQ / Serviço de confecção de Mesa de reuniões em MDF medindo 2,75m x 1,40 com Component 3: Project Pending fiação embutida no centro Request for Single Stage - One 2017-06- 2017-07- 2017-09- TF / 18765 Management, Monitoring Post Limited 0.00 Implement para acesso de Quotations Envelope 28 24 22 and Evaluation ation computadores e eletrônicos E Aparador medindo 1,10 por 30cm de profundidade em MDF para a sala reuniões DGM. BR-CAA-3324-GO-RFQ / Aquisição de lousa de vidro jateado e medindo dois metros de comprimento por Component 3: Project Pending um e dez metros de largura Request for Single Stage - One 2017-06- 2017-07- 2017-09- TF / 18765 Management, Monitoring Post Open - National 0.00 Implement com todos os acessorios Quotations Envelope 30 18 16 and Evaluation ation para fixacao em parede e aquisicao de porta de vidro e aquisicao de vidro temperados para sala reunioes BR-CAA-3317-GO-RFQ / Aquisição de ar Component 3: Project Pending condicionado teto split com Request for Single Stage - One 2017-07- 2017-07- 2017-10- TF / 18765 Management, Monitoring Post Limited 0.00 Implement potencia trinta e seis mil Quotations Envelope 07 27 25 and Evaluation ation btus para estruturacao da sala reunioes projeto SUB 4-8 / CT4.8. Aquisição Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-04- 2017-08- 2018-05- 2017-08- 2018-06- de kits de materiais TF / 18765 and Adaptive Community Post Limited 205.74 Completed Quotations Envelope 13 18 03 17 13 16 didáticos. Initiatives SUB 16-1 / CQ16-1 Aquisição de mudas Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-03- espécies nativas do cerrado TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 13 24 para reflorestamento da Initiatives ation área de vinte nascentes. SUB 16-3 / CQ16-3 Aquisição de um veiculo para fiscalização de áreas Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-05- 2017-07- 2018-06- 2017-10- 2018-09- de nascentes isoladas e TF / 18765 and Adaptive Community Post Limited 9,999.02 Completed Quotations Envelope 29 08 23 08 01 04 recuperadas mobilização Initiatives atividades e gestão operacional do subprojeto SUB 16-10 / CQ16-10 Aquisição de 1920 estacas Component 1: Sustainable Request for Single Stage - One 2017-06- 2017-10- 2017-07- 2017-10- 2017-08- 2017-11- de eucalipto tratado para o TF / 18765 and Adaptive Community Post Limited 7,100.65 Completed Quotations Envelope 30 19 24 30 08 28 isolamento de vinte Initiatives nascentes na comunidade. Component 1: Sustainable Pending SUB 25-4 / CQ25.4 Request for Single Stage - One 2017-07- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Aquisição de um veiculo Quotations Envelope 02 09 08 Initiatives ation SUB 25-7 / CQ25.7 Component 1: Sustainable Pending Request for Single Stage - One 2017-07- 2017-07- 2018-01- Aquisição de materiais de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 06 28 24 expediente tela de projeção Initiatives ation pranchetas SUB 25-8 / CQ25.8 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- Aquisição de uma câmera TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 24 28 06 fotográfica digital Initiatives ation SUB 25-9 / CQ25.9 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- Aquisição de um notebook e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 28 16 um data show Initiatives ation SUB 25-11 / CQ25.11 Component 1: Sustainable Pending Request for Single Stage - One 2018-01- 2018-01- 2018-02- Aquisição de postes de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 02 24 23 eucalipto tratado para cerca Initiatives ation SUB 26-1 / CT26.1 Aquisição de gêneros alimentícios para as Component 1: Sustainable Pending atividade de proteção ao Request for Single Stage - One 2017-06- 2017-07- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement cerrado em Caceres Quotations Envelope 30 18 13 Initiatives ation acompanhamento de consultoria técnica para mapeamento e construção do viveiro de mudas SUB 2-8 / CT26.8 Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-05- 2017-07- 2018-05- 2017-09- 2018-06- Aquisicao de maquina TF / 18765 and Adaptive Community Post Limited 359.97 Completed Quotations Envelope 24 29 18 29 01 28 fotografica Initiatives SUB 45-2 / CT45.2 Aquisicao de veiculo tipo Component 1: Sustainable pick up para coleta de Request for Single Stage - One 2017-06- 2018-01- 2017-07- 2018-02- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Limited 10,257.25 Completed materia prima escoamento Quotations Envelope 25 18 25 15 23 24 Initiatives da produção e apoio as atividades de campo capacitação e monitoramento SUB 45-6 / CT45.6 Component 1: Sustainable Pending Aquisicao de moveis para Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement escritorio sendo estante de Quotations Envelope 27 24 23 Initiatives ation aco armário em aco cadeira e mesa SUB 45-17 / CT45.17 Component 1: Sustainable Pending Aquisicao de equipamento Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para a Unidade de Quotations Envelope 25 17 16 Initiatives ation Beneficiamento SUB 55-2 / CT55.2 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- Aquisicao de um Triturador TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 26 04 Forrageiro Initiatives ation SUB 55-3 / CT55.3 Component 1: Sustainable Pending Aquisicao de uma balanca Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement eletronica com capacidade Quotations Envelope 27 18 17 Initiatives ation de carga para 100 quilo SUB 55-7 / CT55.7 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-08- Aquisicao de tres carrinhos TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 27 26 de mao para coleta de Initiatives ation frutos SUB 55-8 / CT55.8 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-08- Aquisicao de duas estantes TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 17 21 metalicas em aco inox Initiatives ation SUB 55-10 / CT55.10 Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-08- Aquisicao de uma Panela em TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 18 07 aco inoxidavel de trinta Initiatives ation litros SUB 56-2 / CT56.2 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-03- 2017-07- 2018-03- 2017-08- 2018-04- Aquisição de um fogão TF / 18765 and Adaptive Community Post Limited 175.37 Completed Quotations Envelope 02 07 17 07 26 06 industrial de quatro bocas Initiatives SUB 56-3 / CT56.3 Aquisição de ferramentas Component 1: Sustainable Pending para recuperação de áreas Request for Single Stage - One 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement degradadas como pá Quotations Envelope 10 08 12 Initiatives ation enxada carro de mão cavadeira entre outros Component 1: Sustainable SUB 56-4 / CT56.4 Request for Single Stage - One 2017-07- 2018-05- 2017-07- 2018-05- 2017-08- 2018-06- TF / 18765 and Adaptive Community Post Limited 260.10 Completed Aquisição de um notebook Quotations Envelope 01 24 20 24 29 23 Initiatives SUB 56-7 / CT56.7 Aquisição de mudas para Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-02- recuperação de áreas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 12 08 17 degradadas nas margens de Initiatives ation córregos com sistemas agroflorestais SUB 56-8 / CT56.8 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-11- 2017-07- 2017-11- 2017-08- 2017-12- Aquisicao de um portao de TF / 18765 and Adaptive Community Post Limited 205.67 Completed Quotations Envelope 01 14 18 28 17 22 correr com trilhos Initiatives SUB 56-9 / CT56.9 Component 1: Sustainable Aquisicao de materiais de Request for Single Stage - One 2017-07- 2017-11- 2017-07- 2017-11- 2017-08- 2017-12- TF / 18765 and Adaptive Community Post Limited 2,384.99 Signed construcao como sacos de Quotations Envelope 02 14 20 28 19 13 Initiatives cimento tijolos telhas outros necessarios SUB 56-16 / CT56.16 Aquisição de materiais pedagógicos para oito oficinas comunitária de Component 1: Sustainable Pending capacitação mapeamento e Request for Single Stage - One 2017-07- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement planejamento participativo e Quotations Envelope 03 28 27 Initiatives ation uma oficina de capacitação sobre recuperação e proteção de microbacias e construção de plano de trabalho SUB 61-4 / CQ61.4 Aquisição de moveis para Component 1: Sustainable escritório como quatro Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled armários um arquivo vinte Quotations Envelope 21 15 24 Initiatives e uma cadeiras uma estrutura com três cadeiras doze mesas SUB 61-5 / CQ61.5 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-09- Aquisição de uma estufa de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 25 18 27 secagem Initiatives SUB 61-8 / CQ61.8 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-09- Aquisicao de um Forno TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 21 30 Turbo com dez bandejas Initiatives SUB 61-10 / CQ61.10 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Aquisição de doze facas de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 23 22 inox Initiatives SUB 61-12 / CQ61.12 Aquisição de dez computadores um Notebook uma caixa de som para Component 1: Sustainable computador uma Request for Single Stage - One 2017-07- 2019-05- 2017-07- 2019-06- 2017-09- 2019-06- TF / 18765 and Adaptive Community Post Limited 7,443.53 Completed impressora um projetor Quotations Envelope 08 30 31 13 29 14 Initiatives multimídia cinco estabilizadores um modem cartuchos de tinta para impressora e uma calculadora eletrônica SUB 61-20 / CQ61.20 Aquisicão de gêneros alimentícios dos Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-12- comunitários para a TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 16 05 capacitação da valoração da Initiatives ation produção artesanal quilombola existente na Comunidade SUB 71-1 / CT71.1 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-07- 2017-09- Aquisição de um ônibus TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 31 14 usado de linha Initiatives SUB 75-1 / CQ75.1 Component 1: Sustainable Aquisição de equipamentos Request for Single Stage - One 2017-07- 2018-01- 2017-07- 2018-01- 2017-09- 2018-02- TF / 18765 and Adaptive Community Post Limited 1,214.25 Completed de informatica sendo Quotations Envelope 07 10 31 10 09 09 Initiatives Projetor multimídia e Notebook SUB 90-5 / CT90.5 Component 1: Sustainable Request for Single Stage - One 2017-07- 2019-10- 2017-07- 2019-10- 2017-09- 2019-11- Aquisição de embalagens de TF / 18765 and Adaptive Community Post Limited 3,706.64 Completed Quotations Envelope 08 03 28 16 11 11 conteúdo inferior ou igual a Initiatives um quilo Page 1 SUB 99-1 / CT99.1 Component 1: Sustainable Aquisicao de materiais Request for Single Stage - One 2017-07- 2018-01- 2017-07- 2018-02- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Limited 1,318.66 Completed eletricos e hidraulicos para Quotations Envelope 07 18 28 07 01 08 Initiatives implantacao das unidades produtivas SUB 99-2 / CT99.2 Aquisição de materiais para Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-01- 2017-07- 2018-02- 2017-09- 2018-03- infraestrutura para TF / 18765 and Adaptive Community Post Limited 26,237.06 Completed Quotations Envelope 09 18 28 06 11 08 implantação das unidades Initiatives produtivas SUB 99-3 / CT99.3 Aquisição de bens para Component 1: Sustainable implantação das unidades Request for Single Stage - One 2017-07- 2018-01- 2017-08- 2018-02- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Limited 372.93 Completed produtivas como bandejas Quotations Envelope 09 18 02 07 11 08 Initiatives de isopor bebedouros e comedouros para aves SUB 99-4 / CT99.4 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-01- 2017-08- 2018-02- 2017-09- 2018-03- Aquisição de bombas de TF / 18765 and Adaptive Community Post Limited 317.04 Completed Quotations Envelope 08 18 02 07 06 08 água submersa completa Initiatives novecentos w SUB 99-5 / CT99.5 Component 1: Sustainable Aquisição de materiais de Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-05- 2017-09- 2018-06- TF / 18765 and Adaptive Community Post Limited 915.03 Completed construção para Quotations Envelope 10 09 04 24 08 23 Initiatives implantação das unidades produtivas SUB 99-6 / CT99.6 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-01- 2017-08- 2018-02- 2017-09- 2018-04- Aquisição de Caixas de água TF / 18765 and Adaptive Community Post Limited 1,687.86 Completed Quotations Envelope 13 18 02 07 01 06 de cinco mil litros Initiatives SUB 99-7 / CT99.7 Component 1: Sustainable Aquisição de materiais de Request for Single Stage - One 2017-07- 2018-01- 2017-08- 2018-02- 2017-10- 2018-03- TF / 18765 and Adaptive Community Post Limited 5,102.58 Completed madereira para implantação Quotations Envelope 12 18 03 07 02 08 Initiatives das unidades produtivas SUB 99-8 / CT99.8 Aquisicao de insumos para Component 1: Sustainable Pending Request for Single Stage - One 2017-07- 2017-08- 2017-08- as unidades produtivas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 12 01 26 como Sacos de calcario Initiatives ation Substratos e Composto organico SUB 99-9 / CT99.9 Aquisicao de insumos para Component 1: Sustainable as unidades produtivas Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-05- 2017-09- 2018-06- TF / 18765 and Adaptive Community Post Limited 490.24 Completed como Pacote de semente de Quotations Envelope 10 09 07 24 06 23 Initiatives hortalica Sacos sementes de milho grao crioulo e Sacos de milho grao SUB 99-10 / CT99.10 Aquisicao de animais para Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-05- 2017-09- 2018-06- as unidades produtivas TF / 18765 and Adaptive Community Post Limited 620.21 Completed Quotations Envelope 14 09 07 24 06 25 como Galos reprodutores e Initiatives Galinhas caipira SUB 99-11 / CT99.11 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-05- 2017-09- 2018-06- Aquisicao de camera TF / 18765 and Adaptive Community Post Limited 825.48 Completed Quotations Envelope 16 22 07 22 16 21 fotografica profissional Initiatives SUB 99-12 / CT99.12 Component 1: Sustainable Pending Aquisicao de kit de material Request for Single Stage - One 2017-07- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement didatico para cursos oficinas Quotations Envelope 10 28 27 Initiatives ation e intercambios SUB 105-6 / CQ105.6 Aquisição de gêneros alimentícios comunitários em diversas comunidades Component 1: Sustainable Pending para os eventos Oficinas de 2017-07- 2017-07- 2017-08- 2018-07- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement formação em direitos 19 24 05 31 Initiatives ation territoriais Oficinas de elaboração do plano de gestão territorial Encontro da juventude e Caravana quilombola SUB 105-7 / CQ105.7 Aquisição de materiais Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-11- 2017-08- 2018-11- 2017-09- 2018-12- pedagógicos para a Oficina TF / 18765 and Adaptive Community Post Limited 1,402.58 Completed Quotations Envelope 17 14 07 22 01 21 de formação em direitos Initiatives territoriais SUB 105-8 / CQ105.8 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-04- 2017-08- 2018-04- 2017-09- 2018-04- Aquisição de quatro TF / 18765 and Adaptive Community Post Limited 1,665.16 Completed Quotations Envelope 16 09 04 09 08 24 maquinas fotográficas e Initiatives quatro GPS. SUB 109-3 / CT109.3 Component 1: Sustainable Pending Aquisição de materiais de Request for Single Stage - One 2017-07- 2017-08- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção para reforma do Quotations Envelope 20 07 05 Initiatives ation entreposto SUB 109-4 / CT109.4 Component 1: Sustainable Pending Aquisição de materiais de Request for Single Stage - One 2017-07- 2017-08- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement madeira para o telhado para Quotations Envelope 18 04 02 Initiatives ation reforma do entreposto SUB 109-6 / CT109.6 Component 1: Sustainable Pending Aquisição de estante Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement modular metálica com seis Quotations Envelope 16 13 27 Initiatives ation prateleiras para o entreposto SUB 109-7 / CT109.7 Aquisição de forno turbo Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-12- lenha para panificação com TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 16 20 dez esteiras e controle de Initiatives ation temperatura para o entreposto SUB 109-9 / CT109.09 Aquisição de mesa em aço Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- inox com estrutura tubular TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 12 26 total em aço inox para o Initiatives ation entreposto SUB 109-10 / CT109.10 Component 1: Sustainable Pending Aquisição de carrinho tipo Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement plataforma baixa em aço Quotations Envelope 13 06 10 Initiatives ation carbono para o entreposto SUB 109-11 / CT109.11 Aquisição de balança Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- eletrônica digital de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 20 29 bancada capacidade trinta Initiatives ation quilos para o entreposto SUB 109-14 / CT109.14 Aquisição de refeições dos comunitários para Primeiro e Segundo encontro para Component 1: Sustainable Pending elaboração do plano de 2017-08- 2017-09- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement comercialização Curso de 22 01 07 06 Initiatives ation boas praticas de beneficiamento e Encontro para construção dos acordos de boas praticas SUB 110-1 / CQ110.1 Aquisição de equipamentos para construção do viveiro e Component 1: Sustainable Request for Single Stage - One 2017-11- 2018-01- 2018-02- sala de armazenamento de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 24 16 25 sementes como Initiatives Pulverizadores Bomba plastica de cem litros SUB 110-5 / CQ110.5 Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-11- Aquisição de caixas d água TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 18 17 de dois mil litros Initiatives SUB 110-7 / CQ110.7 Component 1: Sustainable Aquisição de ship e Request for Single Stage - One 2017-07- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled equipamentos para Quotations Envelope 26 21 20 Initiatives transmissão de dados SUB 110-8 / CQ110.8 Component 1: Sustainable Request for Single Stage - One 2017-11- 2017-12- 2018-01- Aquisição de armário, mesa TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 22 13 27 e cadeira de escritório Initiatives SUB 110-9 / CQ110.9 Component 1: Sustainable Under Request for Single Stage - One 2017-11- 2020-07- 2017-12- 2018-02- Aquisição de carreta para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 10 22 05 trator Initiatives ation SUB 110-10 / CQ110.10 Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-01- 2017-10- 2018-02- 2017-11- 2018-02- Aquisição de cavadeira TF / 18765 and Adaptive Community Post Limited 90.13 Completed Quotations Envelope 20 25 16 07 20 23 articulada em aço Initiatives SUB 110-11 / CQ110.11 Aquisição de Notebook, Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-04- 2017-08- 2018-04- 2017-09- 2018-05- impressora, maquina TF / 18765 and Adaptive Community Post Limited 1,338.22 Completed Quotations Envelope 25 24 18 24 27 24 fotográfica, Aparelho de GPS Initiatives e Cartuchos impressora SUB 110-12 / CQ110.12 Component 1: Sustainable Aquisição de geladeira para Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled viveiro e sala de Quotations Envelope 30 23 27 Initiatives armazenamento de sementes SUB 110-15 / CQ110.15 Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-01- 2017-08- 2018-02- 2017-10- 2018-03- Aquisição de implemento TF / 18765 and Adaptive Community Post Limited 1,027.37 Completed Quotations Envelope 04 24 29 07 18 15 perfurador de solo Initiatives SUB 110-16 / CQ110.16 Component 1: Sustainable Request for Single Stage - One 2017-09- 2020-07- 2017-10- 2020-07- 2017-12- 2020-10- Aquisição de tanque TF / 18765 and Adaptive Community Post Limited 1,039.50 Completed Quotations Envelope 19 15 13 27 02 01 reboque Initiatives SUB 110-17 / CQ110.17 Component 1: Sustainable Request for Single Stage - One 2017-11- 2017-12- 2018-01- Aquisição de tambores de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 22 18 27 plastico de duzentos litros Initiatives SUB 110-18 / CQ110.18 Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-11- Aquisição de catraca para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 23 16 20 esticar arame Initiatives SUB 110-26 / CQ110.26 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-10- Aquisição de materiais TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 24 23 expediente Initiatives SUB 110-28 / CQ110.28 Component 1: Sustainable Aquisição de gênero 2017-11- 2017-12- 2018-01- 2018-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled alimentícios de 28 08 02 09 Initiatives comunitários para realizar capacitações SUB 116-7 / CT116.7 Aquisição de materiais de Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-12- 2017-08- 2018-12- 2017-10- 2019-01- ferragens para implantação TF / 18765 and Adaptive Community Post Limited 3,335.96 Completed Quotations Envelope 05 11 28 17 02 28 de unidade de Initiatives processamento e hortas SUB 116-8 / CT116.8 Component 1: Sustainable Aquisição de sementes Request for Single Stage - One 2017-08- 2018-12- 2017-08- 2018-12- 2017-09- 2018-12- TF / 18765 and Adaptive Community Post Limited 534.83 Completed diversas para Implantação Quotations Envelope 01 11 21 18 25 17 Initiatives de Hortas de Quintais SUB 116-10 / CT116.10 Aquisição de estercos de Component 1: Sustainable Pending gado para implantação de 2017-07- 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement hortas reflorestamento e 25 04 14 23 Initiatives ation enriquecimento de agroquintais SUB 116-14 / CT116.14 Component 1: Sustainable Aquisição de calcário para Request for Single Stage - One 2017-08- 2019-01- 2017-08- 2019-01- 2017-09- 2019-01- TF / 18765 and Adaptive Community Post Limited 17.88 Completed enriquecimento de Quotations Envelope 04 04 28 09 22 30 Initiatives Agroquintais SUB 116-15 / CT116.15 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- Aquisição de câmera TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 24 08 fotográfica Initiatives ation SUB 116-17 / CT116.17 Component 1: Sustainable Pending Aquisição de veiculo Request for Single Stage - One 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement motocicleta cento e Quotations Envelope 01 25 09 Initiatives ation cinquenta cilindradas SUB 116-18 / CT116.18 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- Aquisição de kit EPI para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 10 29 03 coleta de lixo Initiatives ation SUB 116-21 / CT116.21 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- Aquisição de dez kits de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 03 23 02 material didático para Initiatives ation eventos SUB 130-1 / CT130.1 Component 1: Sustainable Pending Aquisição de matérias Request for Single Stage - One 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement primas para beneficiamento Quotations Envelope 01 21 25 Initiatives ation do Jatobá Pequi e Baru SUB 130-3 / CT130.3 Component 1: Sustainable Aquisição de embalagens de Request for Single Stage - One 2017-07- 2018-12- 2017-08- 2018-12- 2017-09- 2019-01- TF / 18765 and Adaptive Community Post Limited 1,458.51 Completed vidraria para Jatobá Baru e Quotations Envelope 31 11 18 18 27 18 Initiatives Pequi SUB 130-4 / CT130.4 Component 1: Sustainable Under Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2017-10- Aquisição de empacotadeira TF / 18765 and Adaptive Community Post Limited 12,713.30 Implement Quotations Envelope 28 21 18 02 a Vácuo. Initiatives ation SUB 3-3 / Aquisição de equipamentos de Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-06- 2017-09- 2018-06- 2017-11- 2018-07- informática: notebook, TF / 18765 and Adaptive Community Post Limited 2,057.41 Completed Quotations Envelope 14 05 04 05 03 05 projeto multimídia, câmera Initiatives fotográfica, câmera filmadora. SUB 3-4 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- utensílios de copa e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 25 25 cozinha. Initiatives SUB 3-5 / Aquisição de Component 1: Sustainable ferramentas agrícolas Request for Single Stage - One 2017-08- 2018-07- 2017-09- 2018-09- 2017-10- 2018-10- TF / 18765 and Adaptive Community Post Limited 1,960.99 Completed manual (enxada, enxadão, Quotations Envelope 16 25 06 03 13 03 Initiatives machado, cavadeira, facão, etc). Component 1: Sustainable SUB 3-6 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled gêneros alimentícios. Quotations Envelope 05 11 11 Initiatives SUB 3-7 / Aquisição de kit Request for Single Stage - One 2017-08- 2017-08- 2017-10- TF / 18765 Post Limited 0.00 Canceled de material pedagógico. Quotations Envelope 11 28 27 Component 1: Sustainable SUB 3-8 / Aquisição de 20 Request for Single Stage - One 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled litros de graxa lubrificante Quotations Envelope 18 04 16 Initiatives Component 1: Sustainable SUB 3-9 / Aquisição de Request for Single Stage - One 2017-08- 2019-12- 2017-09- 2019-12- 2018-01- 2020-01- TF / 18765 and Adaptive Community Post Limited 11,540.78 Completed 4.000 mudas. Quotations Envelope 23 05 28 23 08 22 Initiatives Component 1: Sustainable SUB 47-3 / Aquisição de Request for Single Stage - One 2017-08- 2018-02- 2017-08- 2018-02- 2017-09- 2018-03- TF / 18765 and Adaptive Community Post Limited 424.04 Completed projetor multimídia Quotations Envelope 02 19 16 20 15 22 Initiatives Component 1: Sustainable SUB 47-4 / Aquisição de Request for Single Stage - One 2018-02- 2018-02- 2018-04- 2018-02- 2018-05- 2018-03- TF / 18765 and Adaptive Community Post Limited 321.32 Completed fogão a gás, 4 bocas Quotations Envelope 23 19 02 20 14 21 Initiatives SUB 47-6 / Aquisição de materiais de construção Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-08- 2017-10- 2018-09- 2017-11- 2018-10- para reforma da unidade de TF / 18765 and Adaptive Community Post Limited 8,474.42 Completed Quotations Envelope 28 20 02 24 13 24 beneficiamento de polpas Initiatives (areia, cimento, pedras, etc) Component 1: Sustainable SUB 74-12 / Aquisição de Request for Single Stage - One 2017-08- 2019-07- 2017-08- 2019-07- 2017-12- 2019-08- TF / 18765 and Adaptive Community Post Limited 834.65 Completed gêneros alimentícios Quotations Envelope 07 11 21 17 18 09 Initiatives Component 1: Sustainable SUB 28-10 / Aquisição de Request for Single Stage - One 2018-02- 2018-03- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled gêneros alimentícios Quotations Envelope 09 12 08 Initiatives SUB 28-11 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-02- 2017-09- 2018-03- 2018-07- 2018-04- mudas para instalação de TF / 18765 and Adaptive Community Post Limited 18,006.29 Completed Quotations Envelope 04 20 19 26 16 24 campos de frutíferas Initiatives Component 1: Sustainable SUB 113-10 / Aquisição de Request for Single Stage - One 2017-09- 2019-06- 2017-09- 2019-06- 2017-11- 2019-06- TF / 18765 and Adaptive Community Post Limited 1,853.70 Completed kits para apicultura. Quotations Envelope 12 03 29 18 30 28 Initiatives SUB 113-11 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- Kit de ferramentas para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 15 04 03 montagem de colméias Initiatives ation SUB 113-12 / Aquisição de kit de ferramentas para Component 1: Sustainable Request for Single Stage - One 2017-09- 2019-06- 2017-10- 2019-06- 2017-12- 2019-06- construção de cercas e TF / 18765 and Adaptive Community Post Limited 2,720.03 Completed Quotations Envelope 18 07 06 18 06 28 preparação de leitos para Initiatives plantio de mudas SUB 113-13 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- 2 kits para instalação de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 06 28 viveiros comunitários Initiatives ation Component 1: Sustainable SUB 113-14 / Aquisição de Request for Single Stage - One 2018-02- 2019-03- 2018-03- 2019-03- 2018-05- 2019-04- TF / 18765 and Adaptive Community Post Limited 2,675.68 Completed materiais de irrigação. Quotations Envelope 14 08 16 25 18 15 Initiatives SUB 113-16 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-06- 1.000 mudas de espécies da TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 05 05 06 região Initiatives ation Page 2 SUB 113-17 / Aquisição de Component 1: Sustainable Pending kit de materiais para Oficina Request for Single Stage - One 2018-03- 2018-04- 2018-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de Transferência de saberes Quotations Envelope 01 02 14 Initiatives ation entre anciões e jovens. Component 1: Sustainable SUB 113-18 / Aquisição de Request for Single Stage - One 2017-09- 2019-09- 2017-09- 2019-09- 2018-12- 2019-09- TF / 18765 and Adaptive Community Post Limited 445.91 Completed gêneros alimentícios Quotations Envelope 11 12 29 16 25 17 Initiatives SUB 120-10 / Aquisição de Barco em alumínio com 6 Component 1: Sustainable metros de comprimento Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 1,948.43 Completed com capacidade para Quotations Envelope 15 28 03 15 04 15 Initiatives receber motores de 30 a 40 hp de potência. SUB 120-11 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- 2018-02- motor de popa de 40hp de TF / 18765 and Adaptive Community Post Limited 3,967.92 Completed Quotations Envelope 18 28 05 20 05 19 potência. Initiatives SUB 120-12 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- 10 kits de equipamentos de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 09 07 proteção individual Initiatives ation Component 1: Sustainable SUB 120-13 / Aquisição de Request for Single Stage - One 2017-11- 2018-07- 2017-11- 2018-08- 2017-12- 2018-09- TF / 18765 and Adaptive Community Post Limited 1,212.20 Completed kit de coletas de sementes Quotations Envelope 03 23 20 16 29 15 Initiatives Component 1: Sustainable Pending SUB 135-8 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Gêneros alimentícios Quotations Envelope 21 06 06 Initiatives ation Component 1: Sustainable SUB 135-9 / Aquisição de Request for Single Stage - One 2017-09- 2017-09- 2017-10- 2017-09- 2017-11- 2017-10- TF / 18765 and Adaptive Community Post Limited 167.12 Completed uma caixa de som portátil Quotations Envelope 21 20 04 25 04 26 Initiatives SUB 135-10 / Aquisição de equipamentos - notebook - Component 1: Sustainable Aquisição de projetor Request for Single Stage - One 2017-09- 2017-12- 2017-10- 2017-12- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 1,676.86 Completed multimídia - Aquisição de Quotations Envelope 21 15 04 18 14 10 Initiatives câmera filmadora/fotográfica profissional SUB 135-11 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- kit de ferramentas para obra TF / 18765 and Adaptive Community Post Limited 1,178.62 Completed Quotations Envelope 23 16 08 16 18 05 em bio construção Initiatives SUB 135-12 / Aquisição de Component 1: Sustainable kit de ferramentas para Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- TF / 18765 and Adaptive Community Post Limited 202.20 Completed auxiliar na produção de Quotations Envelope 23 16 09 13 18 28 Initiatives sementes SUB 135-15 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-11- prensa para farinha de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 21 06 16 mandioca Initiatives ation SUB 135-18 / Aquisição de Component 1: Sustainable utensílios para estruturação Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- TF / 18765 and Adaptive Community Post Limited 64.21 Completed da cozinha do espaço Quotations Envelope 23 16 09 16 09 16 Initiatives multiuso SUB 135-19 / Aquisição de Component 1: Sustainable Pending kit de materiais para obra Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement do espaço mullti uso - Quotations Envelope 16 11 11 Initiatives ation materiais de construção - madeireira SUB 135-20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-10- 2017-10- 2017-11- 2017-11- 1000 m3 de hiper adobe TF / 18765 and Adaptive Community Post Limited 283.42 Completed Quotations Envelope 25 11 10 23 10 18 (bobina) Initiatives Component 1: Sustainable SUB 135-21 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2017-10- 2017-11- 2017-11- 2017-11- TF / 18765 and Adaptive Community Post Limited 1,870.59 Completed 145 telhas ecológicas Quotations Envelope 25 23 10 01 10 30 Initiatives Component 1: Sustainable SUB 42-23 / Aquisição de Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- 2017-12- TF / 18765 and Adaptive Community Post Limited 7,617.93 Completed 02 motocicletas Quotations Envelope 26 17 13 04 13 20 Initiatives SUB 42-24 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-12- 2017-12- Barco e Motor para apoiar TF / 18765 and Adaptive Community Post Limited 4,216.30 Completed Quotations Envelope 29 08 16 20 16 20 vigilância. Initiatives SUB 42-26 / Aquisição de Component 1: Sustainable armário em aço fechado e Request for Single Stage - One 2017-10- 2019-01- 2017-10- 2019-01- 2017-11- 2019-01- TF / 18765 and Adaptive Community Post Limited 634.76 Completed mesa para 6 lugares, com Quotations Envelope 02 14 18 23 18 31 Initiatives cadeiras. SUB 42-28 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-03- 2017-11- 2018-04- três Rádios Walk Talk Bivolt, TF / 18765 and Adaptive Community Post Limited 181.46 Completed Quotations Envelope 22 23 09 23 09 21 25 km Initiatives SUB 42-29 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-05- 2017-10- 2018-05- 2017-12- 2018-06- 01 notebook e de 01 TF / 18765 and Adaptive Community Post Limited 836.96 Completed Quotations Envelope 27 08 14 09 14 08 máquina fotográfica Initiatives SUB 42-30 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-10- 2017-10- 2017-11- Kit telefone rural com TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 10 27 27 internet. Initiatives ation SUB 30 - 15 / Aquisição de arame liso n°. 12 e 20 Rolos Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-08- 2017-10- 2018-08- 2018-01- 2018-09- de arame liso, sendo 1000 TF / 18765 and Adaptive Community Post Limited 2,266.03 Completed Quotations Envelope 13 01 30 14 01 12 metros cada rolo e bitola Initiatives 1/2''. Component 1: Sustainable SUB 42-31 / Aquisição de Request for Single Stage - One 2017-10- 2017-10- 2017-10- 2017-11- 2017-11- 2017-11- TF / 18765 and Adaptive Community Post Limited 102.55 Completed fogão industrial Quotations Envelope 03 25 20 06 20 08 Initiatives SUB 42-32 / Utensílios de cozinha: 5 panelas grandes, 4 bacias, 2 baldes plásticos, Component 1: Sustainable 2 garrafas térmicas de 5 Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled litros, 2 garrafas térmicas Quotations Envelope 23 10 10 Initiatives para café, 4 conchas grandes, 4 facas, 2 lampiões, 1 caixa térmica grande. SUB 42-33 / Aquisição de Kit de vestuário para ações Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-10- 2017-12- 2017-11- 2018-01- de vigilância e fiscalização TF / 18765 and Adaptive Community Post Limited 582.24 Completed Quotations Envelope 23 07 10 08 10 06 com 2 camisetas, 1 boné e Initiatives 1 colete de identificação de vigilância. SUB 42-34 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-06- 2017-10- 2018-07- 2017-11- 2018-08- kit padrão de energia TF / 18765 and Adaptive Community Post Limited 195.27 Completed Quotations Envelope 02 19 18 12 18 11 monofásico Initiatives SUB 42-35 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-06- 2017-10- 2018-07- 2017-11- 2018-08- kit para banheiro: Vaso TF / 18765 and Adaptive Community Post Limited 195.91 Completed Quotations Envelope 04 19 21 12 21 11 sanitário, chuveiro, Initiatives encanamento, etc. SUB 30 - 20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-01- 2017-10- 2018-03- 2017-11- 2018-03- 02 (dois) fogões industriais TF / 18765 and Adaptive Community Post Limited 534.47 Completed Quotations Envelope 02 30 19 02 20 31 quatro bocas. Initiatives Component 1: Sustainable SUB 42-36 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2017-10- 2017-11- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 3,545.52 Completed alimentos. Quotations Envelope 19 25 06 06 06 08 Initiatives SUB 30 - 21 / Aquisição de Component 1: Sustainable 02 (duas) Caixas d'água e Request for Single Stage - One 2017-10- 2018-08- 2017-10- 2018-08- 2017-11- 2018-09- TF / 18765 and Adaptive Community Post Limited 220.78 Completed 02 (dois) Carrinhos de mão Quotations Envelope 13 01 30 14 30 13 Initiatives galvanizado. SUB 30 - 24 / Aquisição de Component 1: Sustainable Impressora monocromática Request for Single Stage - One 2017-09- 2018-12- 2017-10- 2018-12- 2017-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 1,222.96 Completed a laser wi-fi, tonner e Quotations Envelope 29 19 16 19 16 04 Initiatives Computador desktop. SUB 30 - 26 / Aquisições de machados, podões e ferramentas semelhantes com gume- machados, Tijo Component 1: Sustainable furado 8 furos, Kit de Request for Single Stage - One 2017-10- 2018-08- 2017-10- 2018-08- 2017-11- 2018-09- TF / 18765 and Adaptive Community Post Limited 1,012.69 Completed ferramentas para Quotations Envelope 02 01 18 14 18 12 Initiatives construção do viveiro, Peças de treliça c/ 6 m de altura fig. nº 1 e 2, Janela veneziana 1,20m x 1m, Porta veneziana 2,10m x 0,80m. SUB 30 - 27 / Aquisição de Component 1: Sustainable jogos de pratos, talheres, Request for Single Stage - One 2017-09- 2018-12- 2017-10- 2018-12- 2017-11- 2019-01- TF / 18765 and Adaptive Community Post Limited 881.80 Completed utensílios de cozinha e Quotations Envelope 29 13 16 19 06 18 Initiatives panelas grandes. SUB 30 - 30 / Aquisição de generos alimenticios (kit: Component 1: Sustainable arroz, feijão, carne, Request for Single Stage - One 2017-09- 2018-06- 2017-10- 2018-07- 2019-12- 2018-08- TF / 18765 and Adaptive Community Post Limited 1,815.17 Completed macarrão, salada, sucos, Quotations Envelope 29 27 16 19 26 17 Initiatives sobremesas) refeições para os participantes. SUB 30 - 32 / Aquisição de Kit de material de escritório (papel a4, canetas, grampeador, pasta arquivo, Component 1: Sustainable envelopes, pasta Request for Single Stage - One 2017-09- 2018-07- 2017-10- 2018-08- 2017-11- 2018-09- TF / 18765 and Adaptive Community Post Limited 826.09 Completed catálogo),04 Kits material Quotations Envelope 29 26 16 14 16 12 Initiatives didático (caneta, papel a4, pasta, apostilas, papel pardo, pincel atômico), Kit de material de papelaria contendo caderno SUB 120-16 / Aquisição de gêneros alimentícios Component 1: Sustainable Pending adquiridos direto da 2017-12- 2017-12- 2018-01- 2018-07- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement comunidade para Realização 05 19 09 28 Initiatives ation do encontro anual dos coletores do tix SUB 4-4 / CT4.4. Aquisição Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-11- 2017-11- 2018-11- 2019-03- 2018-12- de gêneros alimentícios fora TF / 18765 and Adaptive Community Post Limited 467.92 Completed Quotations Envelope 07 13 10 22 05 20 comunidade. Initiatives SUB 4-5 / CT4.5. Aquisição de ferramentas e de arame Component 1: Sustainable Request for Single Stage - One 2017-10- 2018-08- 2017-11- 2018-09- 2017-11- 2018-10- farpado de ferro ou aço TF / 18765 and Adaptive Community Post Limited 1,263.66 Completed Quotations Envelope 20 02 20 03 30 03 para cercamento e Initiatives isolamento das nascentes. SUB 4-7 / CT4.7. Aquisição Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-10- de equipamentos para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 24 26 16 brigada de combate a Initiatives incêndios. SUB 135-16 / Aquisição de Component 1: Sustainable Pending utensílios para estruturação Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement da cozinha do espaço Quotations Envelope 25 09 09 Initiatives ation multiuso - tacho para farinha SUB 135-13 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- kit para construção de TF / 18765 and Adaptive Community Post Limited 471.31 Completed Quotations Envelope 25 16 09 13 09 28 espaço multiuso Initiatives SUB 135-14 / Aquisição de Component 1: Sustainable Pending kit de materiais para Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção de espaço Quotations Envelope 25 09 09 Initiatives ation multiuso SUB 135-17 / Aquisição de Component 1: Sustainable Pending utensílios para estruturação Request for Single Stage - One 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement da cozinha do espaço Quotations Envelope 23 09 08 Initiatives ation multiuso SUB 4-3 / CT4.3. Aquisição Component 1: Sustainable Pending 2017-07- 2017-08- 2017-08- 2018-12- de gêneros alimentícios TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 11 02 25 18 direto da comunidade Initiatives ation SUB 56-17 / CT56.17 Aquisição de gêneros alimentícios direto da comunidade para oficinas Component 1: Sustainable comunitária de capacitação 2017-06- 2017-07- 2017-07- 2019-06- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled mapeamento e 29 08 18 18 Initiatives planejamento participativo e oficinas de construção do plano de gestão dos recursos hidricos comunitario Component 1: Sustainable Under SUB 56 - 19 / Aquisição de Request for Single Stage - One 2017-11- 2018-02- 2017-12- 2019-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Gêneros alimentícios Quotations Envelope 25 15 16 18 Initiatives ation SUB 134-4 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-02- 2017-12- 2018-03- 2018-01- 2018-03- ferramentas e utensilios TF / 18765 and Adaptive Community Post Limited 2,830.03 Completed Quotations Envelope 04 15 21 02 20 31 para construcao do viveiro Initiatives Component 1: Sustainable SUB 110 - 29 / Aquisição Request for Single Stage - One 2017-11- 2018-06- 2017-12- 2018-06- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 78.44 Completed de Trena Digital. Quotations Envelope 16 12 07 12 08 26 Initiatives Component 1: Sustainable SUB 134-5 / Aquisicao de Request for Single Stage - One 2017-12- 2018-11- 2017-12- 2018-11- 2018-02- 2018-12- TF / 18765 and Adaptive Community Post Limited 489.86 Completed compostos para viveiro Quotations Envelope 04 26 21 27 19 12 Initiatives SUB 134-6 / Aquisiacao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2017-12- 2018-01- sacolas plasticas para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 22 21 mudas e regador Initiatives Component 1: Sustainable Under SUB 134-7 / Aquisicao de Request for Single Stage - One 2017-11- 2018-04- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 575.36 Implement projetor e tela de projecao Quotations Envelope 29 04 21 19 Initiatives ation SUB 134-8 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-01- 2018-02- arquivo de aco ultra em TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 05 06 05 chapa Initiatives SUB 134-9 / Aquisicao de camera fotografica Component 1: Sustainable Request for Single Stage - One 2017-11- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- profissional com tripe TF / 18765 and Adaptive Community Post Limited 838.42 Completed Quotations Envelope 24 11 19 11 18 09 profissional e cartao de Initiatives memoria Component 1: Sustainable SUB 134-10 / Aquisição de Request for Single Stage - One 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled caixa de som amplificada Quotations Envelope 04 20 18 Initiatives SUB 134-11 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-01- 2017-12- 2018-01- 2018-02- 2018-02- computador notebook e TF / 18765 and Adaptive Community Post Limited 769.55 Completed Quotations Envelope 04 10 20 10 18 14 impressora multifuncional Initiatives Component 1: Sustainable SUB 134-12 / Aquisicao de Request for Single Stage - One 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled moto bomba a diesel Quotations Envelope 08 07 08 Initiatives Component 1: Sustainable SUB 134-13 / Aquisicao de Request for Single Stage - One 2017-11- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled vigota de madeira Quotations Envelope 30 18 17 Initiatives SUB 127-23 / Aquisição de generos alimenticios direto Component 1: Sustainable 2017-11- 2017-11- 2017-12- 2018-02- da comunidade durante a TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 17 30 14 12 construcao e reunioes do Initiatives Centro SUB 127-24 / Aquisicao de demais generos alimeniícios Component 1: Sustainable Request for Single Stage - One 2017-11- 2019-01- 2017-12- 2019-01- 2018-02- 2019-02- para consumo durante TF / 18765 and Adaptive Community Post Limited 492.64 Completed Quotations Envelope 29 07 15 28 13 26 reunioes para realizacao do Initiatives Centro de Revitalizacao SUB 127-25 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-12- 2018-01- 2018-12- 2018-01- 2019-01- armario arquivo em aco TF / 18765 and Adaptive Community Post Limited 172.57 Completed Quotations Envelope 08 20 02 20 22 20 para escritorio Initiatives SUB 127-27 / Aquisicao de equipamentos de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-05- 2017-12- 2018-05- 2018-02- 2018-06- informatica uma impressora TF / 18765 and Adaptive Community Post Limited 1,933.60 Completed Quotations Envelope 04 21 18 21 16 22 um notebook um projetor Initiatives multimidia e uma camera semi profissional SUB 127-28 / Aquisicao de Component 1: Sustainable Pending materiais de construcao Request for Single Stage - One 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para obra do Centro de Quotations Envelope 08 26 24 Initiatives ation Revitalizacao SUB 127-29 / Aquisicao de Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2017-12- 2018-01- roda d agua com vazao de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 27 26 8500l e instalacao Initiatives ation Component 1: Sustainable SUB 127-30 / Aquisicao de Request for Single Stage - One 2017-12- 2018-04- 2018-01- 2018-05- 2018-03- 2018-06- TF / 18765 and Adaptive Community Post Limited 3,527.67 Completed motocicleta Quotations Envelope 18 04 09 07 10 11 Initiatives SUB 127-31 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-01- 2018-03- geladeira e freezer vertical TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 20 15 16 capacidade de 900l Initiatives SUB 105-10 / CQ105.10 Component 1: Sustainable Request for Single Stage - One 2017-11- 2018-05- 2017-12- 2018-05- 2018-01- 2018-06- Aquisição de (04) quatro TF / 18765 and Adaptive Community Post Limited 503.81 Completed Quotations Envelope 20 16 11 16 27 15 caixas de som amplificadas Initiatives Page 3 Component 1: Sustainable SUB 105 - 12 / Aquisição Request for Single Stage - One 2017-11- 2018-02- 2017-12- 2018-02- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Limited 2,580.24 Completed de 05 (cinco) Notebooks. Quotations Envelope 20 05 13 05 27 05 Initiatives Component 1: Sustainable SUB 105 -13 / Aquisição de Request for Single Stage - One 2017-11- 2018-05- 2017-12- 2018-05- 2018-01- 2018-06- TF / 18765 and Adaptive Community Post Limited 1,058.41 Completed 04 (quatro) Projetores. Quotations Envelope 17 15 11 16 27 15 Initiatives SUB 105 -14 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-11- 2018-05- 2017-12- 2018-05- 2018-01- 2018-06- 04 (quatro) gravadores de TF / 18765 and Adaptive Community Post Limited 369.97 Completed Quotations Envelope 20 15 13 16 29 15 voz digitais. Initiatives SUB 88-1 / Aquisição de Component 1: Sustainable veículo, motor 1.0 ou 1.2 ou Request for Single Stage - One 2017-12- 2018-01- 2017-12- 2018-03- 2018-03- 2019-03- TF / 18765 and Adaptive Community Post Limited 9,836.30 Completed 1.3, ar condicionado, Quotations Envelope 11 24 28 07 09 07 Initiatives direção hidraulica, flex, way SUB 88-2 / Aquisição de Component 1: Sustainable aparelho de GPS rural para Request for Single Stage - One 2017-12- 2018-04- 2017-12- 2018-04- 2018-01- 2018-05- TF / 18765 and Adaptive Community Post Limited 332.21 Completed utilização do trabalho de Quotations Envelope 11 20 28 20 29 21 Initiatives campo SUB 88-3 / Aquisição de câmera fotográfica profissional com o kit: Component 1: Sustainable câmera, case, cartão de Request for Single Stage - One 2017-12- 2018-05- 2017-12- 2018-05- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Limited 744.21 Completed memória e tripé. Quotations Envelope 12 08 29 08 08 07 Initiatives Aquisição de gravador de voz digital com cartão de memória. SUB 88-4 / Aquisição de Dronner com câmera full HD e Wifi para registros Component 1: Sustainable Request for Single Stage - One 2017-12- 2018-05- 2017-12- 2018-05- 2018-02- 2018-06- fotográficos e vídeo para TF / 18765 and Adaptive Community Post Limited 543.10 Completed Quotations Envelope 11 08 28 08 27 07 mapeamentos dos Initiatives potenciais e vulnerabilidades no território. SUB 88-5 / Aquisição de kits de materiais didáticos Component 1: Sustainable Request for Single Stage - One 2017-12- 2017-12- 2018-04- para atividades de gestão, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 12 29 09 monitoramento, Initiatives mobilização e oficinas Component 1: Sustainable SUB 88-6 / Aquisição de Request for Single Stage - One 2017-12- 2017-12- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled kits de Gênero alimentícios Quotations Envelope 12 29 06 Initiatives Component 1: Sustainable Community Pending SUB 142 -4 / Aquisição de 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement gerador 1200 w 15 29 08 09 15 17 Initiatives Development ation Component 1: Sustainable Community SUB 98 -5 / Aquisição de 2017-12- 2018-09- 2017-12- 2018-09- 2017-12- 2018-09- 2018-01- 2018-10- 2018-01- 2018-10- 2018-02- 2019-02- TF / 18765 and Adaptive Community Post Driven Limited 326.58 Completed Sacola de muda. 08 13 22 13 28 21 02 01 09 01 08 05 Initiatives Development SUB 142 -5 / Aquisição de Hd externo 1tb, Hd externo Component 1: Sustainable Community 2017-12- 2018-05- 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-03- 3tb No break, Impressora, TF / 18765 and Adaptive Community Post Driven Limited 1,289.75 Signed 15 11 29 11 08 11 09 11 15 14 17 Tinta para impressora Initiatives Development Computador desktop. SUB 142 -6 / Aquisição de itens para construção: Lima chata para enxada, Enxada, Rastelo, Cutelo, Foice, Component 1: Sustainable Community Pending 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- Matraca, Pá, Carrinho de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 15 29 08 09 15 15 mão, Regador, Facão, Initiatives Development ation Tambor de plástico 30L, Mangueira 100 ml, Mangueira micro perfurada. SUB 142 -7 / Aquisição de Component 1: Sustainable Community Câmera Digital para registro 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-06- TF / 18765 and Adaptive Community Post Driven Limited 597.80 Completed audiovisual: Cartão SD 32 18 07 01 07 10 07 12 07 18 08 19 23 Initiatives Development GB, Cartão SD 64 GB. SUB 98 - 8 / Sistema de Component 1: Sustainable Community energia solar para 2017-12- 2018-05- 2017-12- 2018-05- 2018-01- 2018-06- 2018-01- 2018-07- 2018-01- 2018-07- 2018-03- 2018-08- TF / 18765 and Adaptive Community Post Driven Limited 2,654.39 Completed bombeamento de água para 13 14 27 14 03 12 05 24 13 26 15 24 Initiatives Development o viveiro. SUB 98 - 9 / Aquisição Component 1: Sustainable Community 2017-12- 2018-09- 2017-12- 2018-09- 2018-01- 2018-09- 2018-01- 2018-09- 2018-01- 2018-09- 2018-03- 2018-10- Bomba dágua para TF / 18765 and Adaptive Community Post Driven Limited 1,637.88 Completed 13 13 27 13 03 14 08 24 15 25 16 24 irrigação. Initiatives Development SUB 98 -10 / Aquisição de ferramentas e equipamentos, sendo: Rolo Component 1: Sustainable Community tela de arame, Caixa dágua 2017-12- 2018-07- 2018-01- 2018-07- 2018-01- 2018-07- 2018-01- 2018-07- 2018-01- 2018-07- 2018-03- 2018-08- TF / 18765 and Adaptive Community Post Driven Limited 5,188.89 Completed polietileno capacidade 5, 20 10 03 10 12 17 15 25 22 26 23 24 Initiatives Development Sombrite , Pá, Kit irrigação, Rolo de arame liso, Fio para o sistema de energia solar. SUB 98 - 11 / Aquisição de Postes de eucalipto tratado , Component 1: Sustainable Community 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-06- 2018-01- 2018-07- 2018-01- 2018-07- 2018-03- 2018-08- Poste de madeira , Poste de TF / 18765 and Adaptive Community Post Driven Limited 3,286.40 Completed 22 22 05 22 15 12 16 25 22 25 23 25 madeira, Poste de madeira e Initiatives Development Poste de madeira. Component 1: Sustainable Community SUB 142 -10 / Aquisição de 2017-12- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 1,611.67 Completed freezer 19 01 02 01 11 01 13 01 19 01 19 31 Initiatives Development SUB 91-3 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-09- 2017-12- 2018-09- 2018-01- 2018-09- 2018-01- 2018-09- 2018-01- 2018-09- 2018-03- 2018-10- materiais para construção TF / 18765 and Adaptive Community Post Driven Limited 917.98 Completed 14 10 28 13 04 21 08 24 14 25 16 25 de viveiros Initiatives Development Component 1: Sustainable Community SUB 142 -11 / Aquisição de 2017-12- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-01- 2018-03- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 494.53 Completed liquidificadores 19 02 02 02 11 02 13 02 19 02 19 19 Initiatives Development SUB 98 - 12 / Aquisição de Component 1: Sustainable Community Kit epi - equipamento de 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-06- 2018-01- 2018-06- 2018-01- 2018-06- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Driven Limited 38.67 Completed proteção individual para os 22 30 05 30 12 04 13 13 23 18 22 17 Initiatives Development viveiristas e ajudante. Component 1: Sustainable Community SUB 98 -13 / Aquisição de 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-06- 2018-01- 2018-06- 2018-01- 2018-06- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Driven Limited 132.29 Completed ferramenta elétrica. 22 30 05 30 12 04 16 13 23 18 22 18 Initiatives Development Component 1: Sustainable Community Pending SUB 142 -12 / Aquisição de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement embalagens 20 03 12 15 20 20 Initiatives Development ation SUB 98 - 14 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-06- 2018-01- 2018-06- 2018-01- 2018-06- 2018-02- Cavadeira articulada em TF / 18765 and Adaptive Community Post Driven Limited 47.92 Signed 22 30 05 30 12 04 15 13 23 18 22 aço. Initiatives Development SUB 142 -13 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-05- gravador de áudio e TF / 18765 and Adaptive Community Post Driven Limited 414.70 Completed 20 08 03 08 12 08 15 08 20 08 20 08 microfone , para gravação Initiatives Development de áudio SUB 125 - 9 / Aquisição de material de escritório as as Component 1: Sustainable Community Pending 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- reuniões bimestrais e TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 20 03 12 15 22 22 semestrais e para confecção Initiatives Development ation dos etno mapas. SUB 91-4 / Aquisição de Component 1: Sustainable Community Pending 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- materiais para produção de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 14 28 04 08 14 14 mudas Initiatives Development ation SUB 125 -10 / Aquisição de 40 toneladas de calcário Component 1: Sustainable Community Pending para correção do ph do solo 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para ser entregue na Aldeia 20 03 15 15 22 21 Initiatives Development ation Bananal Distrito de Taunay - Aquidauana -MS. SUB 91-5 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-04- 2017-12- 2018-04- 2018-01- 2018-04- 2018-01- 2018-05- 2018-01- 2018-05- 2018-03- 2018-06- equipamentos para TF / 18765 and Adaptive Community Post Driven Limited 4,806.80 Completed 15 06 29 06 05 18 09 07 15 07 17 06 bombeamento de água Initiatives Development SUB 125 - 11 / Aquisição de equipamentos de informática, sendo: 02 Component 1: Sustainable Community 2017-12- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- 2018-03- notebook, 01 máquinas TF / 18765 and Adaptive Community Post Driven Limited 2,272.11 Completed 20 28 03 23 15 23 15 23 22 23 23 20 fotográfica, 01 GPS, 01 Initiatives Development Projetor multimídia - data show e 01 Impressora multifuncional. SUB 125 - 12 / Aquisição Component 1: Sustainable Community Pending de rama de mandioca 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement amarela, para ser plantada 17 31 02 12 19 20 Initiatives Development ation nas áreas enriquecidas. Component 1: Sustainable Community Pending SUB 91-6 / Aquisição de 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement terra vegetal 15 29 05 09 15 15 Initiatives Development ation SUB 91-8 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-03- 2018-01- 2018-03- 2018-01- 2018-04- 2018-01- 2018-04- 2018-01- 2018-04- 2018-04- 2018-05- máquinas e equipamentos TF / 18765 and Adaptive Community Post Driven Limited 26,959.48 Completed 20 22 03 22 10 13 14 16 20 26 21 08 agrícolas Initiatives Development SUB 93 - 4 / Aquisição de caixa de som com Component 1: Sustainable Community Pending microfone para realização 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement de reuniões com a 18 01 08 12 19 21 Initiatives Development ation comunidade afim de promover a boa execução do projeto. SUB 143 -2 / Aquisição de Component 1: Sustainable Community 2018-01- 2019-01- 2018-01- 2019-01- 2018-01- 2019-01- 2018-01- 2019-01- 2018-01- 2019-01- 2018-03- 2019-02- kits de material para TF / 18765 and Adaptive Community Post Driven Limited 474.55 Completed 10 10 20 23 25 23 29 24 30 24 02 27 acampamento. Initiatives Development Component 1: Sustainable Community Pending SUB 143 -3 / Aquisição de 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement fitas para filmadora 10 20 27 29 30 02 Initiatives Development ation SUB 124 - 9 / Aquisição de enxadas com cabo, aquisição de roçadeiras semimecanizadas, aquisição Component 1: Sustainable Community 2018-01- 2018-06- 2018-02- 2018-06- 2018-02- 2018-06- 2018-02- 2018-07- 2018-03- 2018-07- 2018-04- 2018-08- de cavadeiras, aquisição de TF / 18765 and Adaptive Community Post Driven Limited 818.96 Completed 30 08 13 08 24 26 24 10 03 25 02 04 limas para amolar Initiatives Development ferramentas, aquisição de enxadões aquisição de 10 f e outros. SUB 143 -4 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-08- 2018-02- 2018-09- 2018-02- 2018-09- 2018-04- 2018-11- duas motocicletas on-off TF / 18765 and Adaptive Community Post Driven Limited 6,914.67 Completed 05 10 24 10 02 11 03 03 05 06 07 05 Road. Initiatives Development Component 1: Sustainable Community Pending SUB 143 -5 / Aquisição de 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement gêneros alimentícios. 15 24 02 03 05 13 Initiatives Development ation SUB 143 -6 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-08- 2018-02- 2018-09- 2018-02- 2018-09- 2018-04- 2018-11- Motor de popa de 15hp com TF / 18765 and Adaptive Community Post Driven Limited 2,224.49 Completed 16 13 30 14 06 20 09 03 12 06 13 06 motor 2t Initiatives Development Component 1: Sustainable Community SUB 143 - 9 / Aquisição de 2018-01- 2018-08- 2018-02- 2018-08- 2018-02- 2018-08- 2018-02- 2018-09- 2018-02- 2018-09- 2018-04- 2018-10- TF / 18765 and Adaptive Community Post Driven Limited 1,738.53 Completed Barco. 20 13 03 14 10 15 12 03 16 06 17 06 Initiatives Development Component 1: Sustainable Community SUB 143 - 8 / Aquisição de 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Driven Limited 725.65 Completed aparelho de GPS. 16 24 30 24 08 24 09 24 12 24 13 23 Initiatives Development SUB 143 -7 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-04- 2018-06- câmera fotográfica e TF / 18765 and Adaptive Community Post Driven Limited 1,187.94 Completed 16 23 30 24 08 24 09 24 12 24 13 23 Aquisição de Notebook Initiatives Development SUB 100 -8 / Aquisição de Component 1: Sustainable Community equipamentos de 2018-01- 2018-03- 2018-01- 2018-04- 2018-01- 2018-04- 2018-01- 2018-04- 2018-02- 2018-04- 2018-03- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 517.01 Completed informática: HD Externo 1TB 05 12 19 11 29 11 30 16 05 11 08 11 Initiatives Development : projetor portátil. Component 1: Sustainable Community SUB 100 - 2 / Aquisição de 2017-12- 2018-07- 2018-01- 2018-07- 2018-01- 2018-07- 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-09- TF / 18765 and Adaptive Community Post Driven Limited 2,032.07 Completed roçadeira e moto serra . 20 09 03 09 12 11 15 08 22 16 21 07 Initiatives Development Component 1: Sustainable Community Pending SUB 100 - 4 / Aquisição de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement kit ferramentas agrícolas. 20 03 12 15 22 21 Initiatives Development ation Component 1: Sustainable Community SUB 100 - 5 / Aquisição de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled kit material do viveiro. 20 03 10 15 22 23 Initiatives Development Component 1: Sustainable Community SUB 100 - 6 / Aquisição de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled gêneros alimentícios 20 03 10 15 22 22 Initiatives Development SUB 100 -7 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-04- 2018-01- 2018-04- 2018-01- 2018-04- 2018-01- 2018-04- 2018-02- 2018-04- 2018-03- 2018-04- caixa de som amplificada TF / 18765 and Adaptive Community Post Driven Limited 154.02 Completed 05 09 19 10 29 10 30 10 05 11 08 30 com usb Initiatives Development SUB 85 -14 / Aquisição de notebook Impressora laser Component 1: Sustainable Community 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- 2018-05- multifuncional e toner TF / 18765 and Adaptive Community Post Driven Limited 1,237.90 Completed 10 20 24 20 02 20 05 21 10 21 12 02 impressora, projetor Initiatives Development portátil, Tela de Projeção Component 1: Sustainable Community SUB 85 - 7 / Aquisição de 2018-01- 2018-08- 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-08- 2018-02- 2018-09- 2018-04- 2018-10- TF / 18765 and Adaptive Community Post Driven Limited 3,351.10 Completed motocicleta . 08 07 22 07 29 07 02 27 09 06 10 05 Initiatives Development SUB 85 -12 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- caixa de som amplificada TF / 18765 and Adaptive Community Post Driven Limited 212.34 Completed 10 08 24 19 02 19 05 19 10 20 23 22 com microfone . Initiatives Development Component 1: Sustainable Community SUB 85 - 8 / Aquisição de 2018-01- 2019-10- 2018-01- 2019-10- 2018-01- 2019-10- 2018-02- 2019-10- 2018-02- 2019-10- 2018-05- 2020-01- TF / 18765 and Adaptive Community Post Driven Limited 886.99 Completed materiais para irrigação. 08 23 22 23 31 23 02 30 09 31 21 21 Initiatives Development SUB 85 -11 / Aquisição de Porteira,Ripas de madeira Component 1: Sustainable Community 2018-01- 2019-02- 2018-01- 2019-02- 2018-01- 2019-03- 2018-02- 2019-03- 2018-02- 2019-03- 2018-07- 2019-03- mista, Postes de eucalipto TF / 18765 and Adaptive Community Post Driven Limited 4,107.59 Completed 08 27 22 27 31 12 02 13 08 13 09 28 tratado e Esticadores de Initiatives Development cerca ,para estrutura de viveiro. SUB 85 - 9 / Aquisição de materiais: Sombrite, bolas de arame, Prego, Prego com Component 1: Sustainable Community 2018-01- 2018-08- 2018-01- 2018-08- 2018-01- 2018-09- 2018-02- 2018-09- 2018-02- 2018-09- 2018-05- 2018-10- cabeça, Arame, Materiais de TF / 18765 and Adaptive Community Post Driven Limited 4,939.45 Completed 08 07 22 09 29 05 02 11 09 24 21 24 construção: areia, cimento, Initiatives Development pedra, ferragens, Cabo de aço e outros. SUB 85 -10 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-08- 2018-01- 2018-08- 2018-01- 2018-08- 2018-02- 2018-09- 2018-02- 2018-09- 2018-05- 2018-10- materiais elétricos e TF / 18765 and Adaptive Community Post Driven Limited 4,808.28 Completed 08 08 22 09 31 22 02 12 08 24 21 24 hidráulicos e elétrico. Initiatives Development AI1 - 5 / Aquisição de materiais Component 1: Sustainable Community Pending consumo/didáticos para 2017-12- 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement realizar 02 articuladores 06 18 26 27 03 23 Initiatives Development ation indígenas, que terão bases de trabalho em Palmas - TO e Campo Grande. AI3 - 4 / Aquisição de kits Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- de material de didático para TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 22 05 12 16 23 26 oficina. Initiatives Development ation SUB 134-3 / Aquisição de Gêneros alimentícios para Component 1: Sustainable atividade de reunião de 2017-11- 2018-11- 2017-11- 2018-11- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled planejamento pratico das 17 26 22 26 19 17 Initiatives atividades e inicio do registro audiovisual. SUB 116-4 / CT116.4 Aquisição de material de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-10- madeireira para implantação TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 28 27 de unidade de Initiatives processamento e hortas SUB 116-12 / CT116.12 Component 1: Sustainable Pending Aquisição de utensílios para Request for Single Stage - One 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement implantação de unidades de Quotations Envelope 08 28 02 Initiatives ation processamento SUB 116-5 / CT116.5 Component 1: Sustainable Aquisição de barros para 2017-07- 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled implantação de unidade de 27 02 14 03 Initiatives processamento e hortas SUB 116-6 / CT116.6 Aquisição de bens para Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Implantação de Hortas de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 23 27 Quintais como Bombas e Initiatives Caixa d água dez mil litros SUB 134-2 / Aquisição de gêneros alimentícios para Component 1: Sustainable preparo de refeições, para 2017-11- 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled trabalhadores que atuarão 24 01 21 19 Initiatives no mutirão de construção do viveiro. Page 4 BR-CAA-39549-GO-RFQ / Aquisicao de equipamentos de informatica para execucao projeto DGM Component 3: Project Pending sendo 01 equipamento Request for Single Stage - One 2018-01- 2018-02- 2018-04- TF / 18765 Management, Monitoring Post Limited 0.00 Implement externo de seguranca e Quotations Envelope 19 05 06 and Evaluation ation backup do Banco de Dados do Sistema do projeto e 01 HD externo para armazenamento dos produtos de comunicacao do projeto. SUB 134 -15 / Aquisição de gêneros alimentícios para Component 1: Sustainable Community preparo de refeições, para 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled trabalhadores que atuarão 06 20 29 02 08 09 Initiatives Development no mutirão de construção do viveiro. SUB 116-11 / CT116.11 Aquisição de itens para Component 1: Sustainable implantação da unidade de Request for Single Stage - One 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled processamento como Portas Quotations Envelope 07 25 24 Initiatives com caixile Dobradicas e Basculantes SUB 116-13 / CT116.13 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Aquisição de extintor contra TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 28 27 incêndio Initiatives SUB 116-19 / CT116.19 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Aquisição de forrageira TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 29 cinco kw Initiatives Component 1: Sustainable SUB 116-20 / CT116.20 Request for Single Stage - One 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Aquisicao de rocadeiras Quotations Envelope 04 24 23 Initiatives SUB 142-14 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-05- 2018-01- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-04- 2018-06- generos alimenticios para TF / 18765 and Adaptive Community Post Driven Limited 1,785.45 Completed 15 18 24 14 05 14 09 21 16 28 17 25 plantio e oficinas Initiatives Development SUB 116-9 / CT116.9 Aquisição de mudas Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-11- 2017-08- 2018-12- 2017-10- 2019-01- diversas para TF / 18765 and Adaptive Community Post Limited 526.43 Completed Quotations Envelope 03 29 22 17 11 16 Enriquecimento de Initiatives Agroquintais com SAF Biodiversos SUB 116-34 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-11- 2018-01- 2018-11- 2018-02- 2018-12- 2018-02- 2018-12- 2018-02- 2018-12- 2018-04- 2019-01- mudas para reflorestamento TF / 18765 and Adaptive Community Post Driven Limited 3,403.17 Completed 15 30 25 30 07 14 09 14 15 14 18 14 e cercamento de rio Initiatives Development SUB 110-6 / CQ110.6 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2018-02- Aquisição de sacos para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 29 21 17 mudas Initiatives SUB 93 - 2 / Aquisição de Component 1: Sustainable Community equipamentos, sendo 01 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled aparelho GPS e 01 Telão de 18 01 08 10 19 20 Initiatives Development projetor para data show. Component 1: Sustainable Community SUB 105 -15 / Aquisição de 2018-01- 2019-03- 2018-01- 2019-03- 2018-02- 2019-03- 2018-02- 2019-03- 2018-02- 2019-03- 2018-03- 2019-04- TF / 18765 and Adaptive Community Post Driven Limited 462.74 Completed 06 cadeiras giratórias. 11 18 22 20 03 20 05 21 12 21 15 30 Initiatives Development SUB 91-7 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-02- 2018-04- 2018-02- 2018-05- 2018-05- 2018-09- materiais para o sistema de TF / 18765 and Adaptive Community Post Limited 8,763.53 Completed Quotations Envelope 02 06 21 07 22 28 bombeamento de água Initiatives Component 1: Sustainable Community Pending SUB 91-2 / Fornecimento 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement de Óleo Diesel 22 02 13 15 22 23 Initiatives Development ation SUB 93 - 3 / Aquisição de insumos para horticultura Component 1: Sustainable Community 2018-01- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-02- 2018-07- 2019-03- (ferramentas manuais, TF / 18765 and Adaptive Community Post Driven Limited 386.28 Completed 18 23 01 23 08 28 12 31 19 01 19 12 sementes, sombrite, tela Initiatives Development lateral, kit irrigação. Component 1: Sustainable Community SUB 93-5 / Aquisição de 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled Sacos para Mudas 18 01 08 10 19 19 Initiatives Development Component 1: Sustainable Community SUB 93-6 / Aquisição de 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-07- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled Brita 18 01 08 10 19 19 Initiatives Development Component 1: Sustainable Community SUB 93-7 / kit EPI (Botas, 2018-01- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-07- 2019-02- TF / 18765 and Adaptive Community Post Driven Limited 154.17 Completed luvas, óculos,avental) 18 04 01 04 08 10 10 14 19 15 19 14 Initiatives Development Component 1: Sustainable SUB 120-9 / Aquisição de 2017-09- 2017-09- 2017-10- 2019-05- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled gêneros alimentícios 05 19 06 29 Initiatives SUB 130-2 / CT130.2 Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-12- 2017-08- 2018-12- 2017-10- 2019-01- Aquisição de embalagens TF / 18765 and Adaptive Community Post Limited 1,051.87 Completed Quotations Envelope 02 11 22 18 01 10 diversas de plastico Initiatives Component 1: Sustainable SUB 130 - 9 / CT130.9 Request for Single Stage - One 2018-01- 2018-12- 2018-02- 2018-12- 2018-03- 2019-01- TF / 18765 and Adaptive Community Post Limited 1,147.55 Completed Embalagens de papelão. Quotations Envelope 29 12 24 18 31 18 Initiatives Component 1: Sustainable SUB 47-7 / Aquisição de Request for Single Stage - One 2018-02- 2018-03- 2018-03- 2018-03- 2018-05- 2018-05- TF / 18765 and Adaptive Community Post Limited 26,979.80 Completed um veículo, tipo caminhão. Quotations Envelope 19 09 27 23 28 28 Initiatives SUB 25-1 N / Aquisição de Component 1: Sustainable um carro de passeio visando Request for Single Stage - One 2018-02- 2018-07- 2018-03- 2018-08- 2018-05- 2018-09- TF / 18765 and Adaptive Community Post Limited 12,685.96 Completed viabilizar atividades do Quotations Envelope 26 30 16 16 15 17 Initiatives projeto. SUB 25-2 N / Aquisição de um Notebook, Datashow, Component 1: Sustainable Request for Single Stage - One 2018-03- 2018-09- 2018-03- 2018-09- 2018-05- 2018-10- tela com suporte para TF / 18765 and Adaptive Community Post Limited 1,237.38 Completed Quotations Envelope 15 03 31 04 10 18 projeção de data show e Initiatives câmera fotográfica SUB 25-5 N / Aquisição de ferramentas e materiais, botas para serviço, chapéus para serviço, bolas de arame Component 1: Sustainable Request for Single Stage - One 2018-03- 2018-10- 2018-04- 2018-11- 2018-05- 2018-12- para cerca de 500 metros, TF / 18765 and Adaptive Community Post Limited 3,569.05 Completed Quotations Envelope 19 17 03 06 03 05 grampos de fio curvado, Initiatives cavadeira, facão, enxada com cabo, enxadão com cabo, pé-de-cabra, regador. SUB 16-17 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-03- 2018-03- 2018-04- 2018-04- 2018-05- 2018-05- arames e distanciadores TF / 18765 and Adaptive Community Post Limited 1,932.27 Completed Quotations Envelope 05 09 11 13 11 14 para cercamento. Initiatives Component 1: Sustainable SUB 47-9 / Aquisição de Request for Single Stage - One 2018-04- 2018-04- 2018-05- 2018-05- 2018-07- 2018-07- TF / 18765 and Adaptive Community Post Limited 3,854.26 Completed carroceria para caminhão. Quotations Envelope 06 10 12 04 13 04 Initiatives SUB 25-3 N / Aquisição de gêneros alimentícios de fornecedores para capacitação, Formação da Component 1: Sustainable Pending comunidade sobre Request for Single Stage - One 2018-03- 2018-04- 2018-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement recuperação ambiental, Quotations Envelope 30 24 24 Initiatives ation Cercamento de nascentes, Oficina sobre plantio de mudas, Seminário temático em agroecologia e avaliação SUB 25-4 N / Aquisição de mudas-plantas apropriadas Component 1: Sustainable Pending Request for Single Stage - One 2018-03- 2018-04- 2018-06- para recuperação de áreas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 03 02 degradadas com frete Initiatives ation incluído. SUB 25-6 N / Aquisição Component 1: Sustainable Request for Single Stage - One 2018-04- 2018-10- 2018-05- 2018-11- 2018-06- 2018-12- poste de eucalipto tratado TF / 18765 and Adaptive Community Post Limited 3,399.94 Completed Quotations Envelope 12 23 12 22 11 26 para cercamento Initiatives SUB 129 - 2 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2018-05- 2018-06- 2018-08- 3 máquinas para furar TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 14 13 sementes. Initiatives ation Component 1: Sustainable Pending SUB 129 - 3 / Aquisição de Request for Single Stage - One 2018-05- 2018-06- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement duas máquinas de costura. Quotations Envelope 07 14 13 Initiatives ation Component 1: Sustainable SUB 129 - 4 / Aquisição de Request for Single Stage - One 2018-05- 2018-06- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled três pirógrafos. Quotations Envelope 07 14 13 Initiatives Component 1: Sustainable Pending SUB 129 - 15 / Aquisição Request for Single Stage - One 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de kit para expedição . Quotations Envelope 23 30 29 Initiatives ation SUB 55-5 / CT55.5 Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-03- 2017-07- 2018-03- 2017-08- 2018-04- Aquisição de dois Freezers TF / 18765 and Adaptive Community Post Limited 905.73 Completed Quotations Envelope 27 27 25 27 29 23 horizontais. Initiatives SUB 135- 7 / Aquisição de Component 1: Sustainable Pending 2018-03- 2018-03- 2018-04- 2018-06- veículo, 4x4, motor a diesel TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 13 18 22 21 e carroceria. Initiatives ation SUB 135-7 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-03- 2017-10- 2017-11- veículo, 4x4, motor a diesel TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 22 26 09 08 e carroceria. Initiatives SUB 123 -5 / Aquisição de Component 1: Sustainable kit de materiais para manejo Request for Single Stage - One 2018-03- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled do forno para produção de Quotations Envelope 28 10 11 Initiatives cerâmica. SUB 123 -7 / Aquisição de Component 1: Sustainable kit de material para Request for Single Stage - One 2018-03- 2019-02- 2018-04- 2019-02- 2018-06- 2019-03- TF / 18765 and Adaptive Community Post Limited 501.89 Completed silkscreen (tela, tinta,rodo, Quotations Envelope 28 07 10 19 11 11 Initiatives papel vegetal, calha etc..) SUB 123 -9 / Aquisição de Component 1: Sustainable Barco de alumínio de Request for Single Stage - One 2018-03- 2018-08- 2018-04- 2018-09- 2018-05- 2018-10- TF / 18765 and Adaptive Community Post Limited 5,377.71 Completed aproximadamente 5 metros Quotations Envelope 28 14 10 06 31 06 Initiatives com motor. SUB 123 -10 / Aquisição de impressora de mesa multifuncional (R$ 500,00). Component 1: Sustainable Aquisição de computador - Request for Single Stage - One 2018-03- 2018-06- 2018-04- 2018-06- 2018-06- 2018-07- TF / 18765 and Adaptive Community Post Limited 1,438.38 Completed 2 notebook completo (R$ Quotations Envelope 28 04 10 05 11 05 Initiatives 4000,00), Aquisição de câmera fotográfica (R$ 1000,00). SUB 123 -12 / Component 1: Sustainable Request for Single Stage - One 2018-03- 2018-04- 2018-04- Equipamentos para instação TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 10 26 de internet a rádio. Initiatives SUB 129 - 6 / Aquisição de Component 1: Sustainable Under materiais de construção Request for Single Stage - One 2018-07- 2020-01- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para construção do ateliê de Quotations Envelope 23 23 30 29 Initiatives ation produção de artesanato. SUB 129 - 1 / Aquisição de gêneros alimentícios para os agentes de Component 1: Sustainable Pending Request for Single Stage - One 2018-05- 2018-06- 2018-08- monitoramento durante as TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 14 13 expedições e alimentação Initiatives ation dos participantes em 3 oficinas que serão realizadas pelo projeto. SUB 129 - 5 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-05- 2018-06- 2018-08- uma bancada de apoio para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 14 13 equipamentos. Initiatives SUB 56-1 / CT56.1 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-05- 2017-07- 2018-06- 2017-08- 2018-07- Aquisição cadeiras para TF / 18765 and Adaptive Community Post Limited 321.36 Completed Quotations Envelope 01 25 18 14 27 13 estrutura da sede do Initiatives projeto. SUB 56- 19 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-04- 2018-05- 2018-05- 2018-04- 2018-06- 2018-05- pratos, copos, jogo de TF / 18765 and Adaptive Community Post Limited 510.25 Completed Quotations Envelope 28 30 21 10 20 24 panelas e colheres Initiatives SUB 88-9 / Aquisição de Component 1: Sustainable combustível e lubrificantes Request for Single Stage - One 2018-04- 2018-05- 2018-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para execução das Quotations Envelope 30 21 17 Initiatives atividades do projeto. SUB 142-17 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2018-04- 2018-05- 2018-06- miçangas para produção de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 25 24 artesanato. Initiatives ation Component 1: Sustainable SUB 130-5 / Aquisição de Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-06- 2017-09- 2018-07- TF / 18765 and Adaptive Community Post Limited 9,378.99 Completed moinho de pedra Quotations Envelope 31 18 21 18 30 16 Initiatives Component 1: Sustainable SUB 130-10 / Aquisição de Request for Single Stage - One 2018-04- 2018-05- 2018-05- 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 5,579.26 Completed moinho de facas Quotations Envelope 30 18 20 11 18 09 Initiatives SUB 4-20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-04- 2018-07- 2018-05- 2018-07- 2018-07- 2018-08- carroceria para veículo tipo TF / 18765 and Adaptive Community Post Limited 1,867.07 Completed Quotations Envelope 30 09 21 16 20 15 caminhão leve Initiatives BR-CAA-39550-GO-RFQ / Aquisição de 19 equipamentos portátil de Component 1: Sustainable Under informática - tablets - para Request for Single Stage - One 2018-04- 2018-06- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement acompanhamento de metas Quotations Envelope 27 20 12 11 Initiatives ation e atividades dos subprojetos - 2º edital de seleção de propostas DGM/FIP/BRASIL SUB 125 -8 / Aquisição de máquinas-trator agrícola Component 1: Sustainable Request for Single Stage - One 2018-05- 2018-10- 2018-06- 2018-10- 2018-07- 2019-02- para execução do projeto TF / 18765 and Adaptive Community Post Limited 29,811.62 Completed Quotations Envelope 12 08 01 23 31 23 nas áreas degradadas, Initiatives nascente e reboque de trator. Component 1: Sustainable SUB 4-2 / CT4.2. Aquisição Request for Single Stage - One 2018-05- 2018-05- 2018-06- 2018-06- 2018-11- 2018-10- TF / 18765 and Adaptive Community Post Limited 32,555.05 Completed de veiculo novo Quotations Envelope 12 29 01 22 28 20 Initiatives SUB 61-7 / CQ61.7 Component 1: Sustainable Pending Request for Single Stage - One 2017-07- 2017-08- 2017-09- Aquisição de Embaladora a TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 21 30 vácuo Initiatives ation SUB 42-22 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- 02 capacetes para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 26 27 motocicleta. Initiatives SUB 42-25 / Aquisição de Component 1: Sustainable pneus especializado para Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled andar em lugares de difícil Quotations Envelope 29 16 16 Initiatives acesso e terras alagadas. SUB 142-9 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-05- 2018-05- 2018-06- 2018-05- 2018-07- 2018-06- duas baterias recarregáveis TF / 18765 and Adaptive Community Post Limited 63.07 Completed Quotations Envelope 30 25 08 25 23 25 para câmera fotográfica Initiatives SUB 42-27 / Aquisição de carrinho de mão - Tijolo de 8 furos - Cimento comum - Telha de cerâmica plan com Component 1: Sustainable Request for Single Stage - One 2017-09- 2018-06- 2017-10- 2018-07- 2017-11- 2018-07- cumieira - Prego para TF / 18765 and Adaptive Community Post Limited 4,439.56 Completed Quotations Envelope 25 19 11 05 11 27 caibros (pacote de pregos Initiatives 17 X 21 mm) e demais materiais para construção de uma barracão de alvenaria. SUB 26-6 / CT26.6 Aquisição de equipamentos Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-09- de informatica como TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 20 18 computador, impressora e Initiatives ation suprimentos SUB 45-4 / CT45.4 Aquisicao de materiais Component 1: Sustainable eletricos hidraulicos e de Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled construcao para a construir Quotations Envelope 26 18 17 Initiatives a Unidade de Beneficiamento de Producao de Azeite de Coco Babacu SUB 45-5 / CT45.5 Component 1: Sustainable Aquisicao de materiais para Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled forro e telhado da Unidade Quotations Envelope 26 19 18 Initiatives de Beneficiamento SUB 45-25 / Fornecimento de Combustível para Component 1: Sustainable Request for Single Stage - One 2018-06- 2018-06- 2018-12- acompanhamento técnico TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 05 25 22 do Subprojeto (São João do Initiatives Arraial - PI) SUB 45-1 / CT45.1 Servico Component 1: Sustainable Pending de fornecimento de Request for Single Stage - One 2018-06- 2018-06- 2018-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement combustivel para Quotations Envelope 05 21 18 Initiatives ation acompanhamento tecnico do subprojeto em Teresina (PI) Page 5 SUB 142 -8 / Aquisição de Component 1: Sustainable carne bovina para Request for Single Stage - One 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- TF / 18765 and Adaptive Community Post Limited 2,141.41 Completed atividades: Oficina de Polpas Quotations Envelope 13 13 15 15 30 25 Initiatives e Festa do Milho. SUB 99-16 / Aquisição de Component 1: Sustainable Pending materiais hidráulicos para Request for Single Stage - One 2018-07- 2018-07- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement implementação de unidade Quotations Envelope 05 22 21 Initiatives ation produtiva. SUB 110-29 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-08- 2018-08- 2018-09- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 28 27 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-34 / Fornecimento de gêneros alimentícios para Component 1: Sustainable Request for Single Stage - One 2018-08- 2018-08- 2018-09- Cercamento da área crítica TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 24 para fins de regeneração Initiatives natural,manejo agroflorestal agroecológico de espécies nativas. BR-CAA-39551-GO-RFQ / Aquisição de notebook, celular, cartão de memória micro SD, estabilizar para Component 2: Capacity filmar com celular, tripé Request for Single Stage - One 2018-09- 2018-11- 2018-09- 2019-02- 2018-11- 2018-12- TF / 18765 Building and Institutional Post Limited 2,657.62 Completed para celular, microfone de Quotations Envelope 10 13 17 13 16 13 Strengthening lapela e mochila para notebook - a serem utilizados pela equipe de comunicação do CAA/DGM Brasil BR-CAA-39552-GO-RFQ / Aquisição de câmera digital profissional para fotografia Component 2: Capacity Request for Single Stage - One 2018-09- 2018-11- 2018-09- 2018-11- 2018-11- 2018-12- e filmagem, lente para TF / 18765 Building and Institutional Post Limited 1,112.15 Completed Quotations Envelope 07 12 12 12 11 12 câmera digital profissional, Strengthening cabo de transferência de dados para câmera digital. 125-15 / Aquisição de 01 Drone para fazer o Component 1: Sustainable Request for Single Stage - One 2018-09- 2018-10- 2018-09- 2018-10- 2018-11- 2018-11- diagnóstico ambiental e TF / 18765 and Adaptive Community Post Limited 2,569.18 Completed Quotations Envelope 09 08 19 23 18 22 territorial, com treinamento Initiatives para uso. Component 1: Sustainable SUB 28-12 / Aquisição de Request for Single Stage - One 2018-11- 2020-12- 2018-12- 2020-12- 2019-01- 2020-12- TF / 18765 and Adaptive Community Post Limited 3,999.58 Completed materiais para construção Quotations Envelope 22 01 15 23 14 23 Initiatives SUB 28-17 / Aquisição de Component 1: Sustainable mudas de banana e coco Request for Single Stage - One 2018-11- 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- TF / 18765 and Adaptive Community Post Limited 2,846.33 Completed para instalação de campos Quotations Envelope 17 26 12 11 11 10 Initiatives de frutíferas. SUB 100 - 12 / Aquisição Component 1: Sustainable Pending de gêneros alimentícios Request for Single Stage - One 2018-11- 2018-12- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para realização de Quotations Envelope 17 15 14 Initiatives ation atividades do projeto SUB 100 - 14 / Contratação Component 1: Sustainable Pending de serviços para confecção Request for Single Stage - One 2018-11- 2018-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de camisetas e bonés para o Quotations Envelope 17 10 08 Initiatives ation concurso de roça do Xingu. Component 1: Sustainable SUB 100 - 16 / Aquisição Request for Single Stage - One 2018-11- 2019-08- 2018-12- 2019-08- 2019-01- 2019-10- TF / 18765 and Adaptive Community Post Limited 2,287.09 Completed de motor de popa 25hp Quotations Envelope 17 14 10 27 09 01 Initiatives BR-CAA-39553-GO-RFQ / Component 1: Sustainable Aquisição de notebooks e Request for Single Stage - One 2018-11- 2018-11- 2019-01- 2018-11- 2019-04- 2018-12- TF / 18765 and Adaptive Community Post Limited 2,990.95 Completed computadores para equipe Quotations Envelope 17 30 25 30 25 31 Initiatives do projeto SUB 120-18 / Aquisição de um barco e um motor de Component 1: Sustainable Pending popa para transporte de Request for Single Stage - One 2018-11- 2018-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement comunitários - saída do Quotations Envelope 17 10 08 Initiatives ation Território Xingu a outras localidades. SUB 116-1 / 27725Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-12- 2017-08- 2018-12- 2017-09- 2019-01- materiais elétricos e TF / 18765 and Adaptive Community Post Limited 1,116.10 Completed Quotations Envelope 03 10 25 18 29 17 hidráulicos para Initiatives implantação das unidade de processamento e hortas SUB 116-2 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- materiais para implantação TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 03 24 08 de Hortas de Quintais Initiatives ation SUB 116-3 / CT116.3 Aquisição de materiais de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-11- construção para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 29 07 implantação de unidade de Initiatives processamento e hortas SUB 116-36 / Aquisição de materiais de construção Component 1: Sustainable Pending Request for Single Stage - One 2018-11- 2018-12- 2019-02- como: cimento, areia, brita TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 16 14 e tijolos para implantação Initiatives ation da unidade de beneficiamento. SUB 116-37 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-12- 2019-09- 2018-12- 2019-10- 2019-02- 2019-10- materiais de irrigação para TF / 18765 and Adaptive Community Post Limited 831.51 Completed Quotations Envelope 01 25 20 02 18 31 hortas Initiatives SUB 116-6-2 / Aquisição Component 1: Sustainable de bens para Implantação Request for Single Stage - One 2018-12- 2019-01- 2018-12- 2019-01- 2019-02- 2019-02- TF / 18765 and Adaptive Community Post Limited 2,804.87 Completed de Hortas de Quintais, como Quotations Envelope 01 04 20 26 18 25 Initiatives bombas e caixas d'águas. SUB 125-17 / Aquisição de Component 1: Sustainable ferramentas para Request for Single Stage - One 2018-12- 2019-11- 2018-12- 2019-11- 2019-02- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,108.38 Completed construção de cercas, para Quotations Envelope 01 23 20 29 18 04 Initiatives cercamento de duas nascentes. SUB 125-16 / Aquisição de Component 1: Sustainable adubos orgânicos e Request for Single Stage - One 2018-11- 2020-10- 2018-12- 2020-11- 2019-01- 2020-11- TF / 18765 and Adaptive Community Post Limited 1,044.39 Completed sementes para plantio e Quotations Envelope 25 29 14 17 13 25 Initiatives recuperação de áreas degradadas. SUB 71-8 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-12- 2020-07- 2018-12- 2020-07- 2019-02- 2020-08- embalagens para produtos TF / 18765 and Adaptive Community Post Limited 2,076.23 Completed Quotations Envelope 01 20 20 23 18 06 beneficiados Initiatives SUB 108-9 / Aquisição de gêneros alimentícios para: Component 1: Sustainable Pending Capacitação em boas Request for Single Stage - One 2018-12- 2018-12- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement prátcas para produção de Quotations Envelope 01 20 19 Initiatives ation alimentos e capacitação em gestão da unidade de beneficiamento. SUB 108-10 / Aquisição de equipamentos para Component 1: Sustainable Pending estruturação da unidade de Request for Single Stage - One 2018-12- 2018-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement beneficiamento - Quotations Envelope 01 22 20 Initiatives ation liquidificador, fogão e forno industrial. SUB 108-11 / Aquisição de Component 1: Sustainable equipamentos para cozinha: Request for Single Stage - One 2018-12- 2020-06- 2018-12- 2020-06- 2019-02- TF / 18765 and Adaptive Community Post Limited 1,343.66 Signed batedeira, amassadeira e Quotations Envelope 01 25 26 25 24 Initiatives modeladora de pães. SUB 108-19 / Aquisição de cuba (tanque) de inox, pia Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-01- com cubas de inox para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 26 25 estruturação da unidade Initiatives ation multiuso. SUB 108-20 / Aquisição de mesa de inox e facas de Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-01- inox, prateleira industrial TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 26 25 para estruturação da Initiatives ation unidade multiuso SUB 108-23 / Aquisição de Component 1: Sustainable Under Request for Single Stage - One 2018-12- 2020-06- 2018-12- 2019-01- 2 freezers para estruturação TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 24 26 25 da unidade multi-uso Initiatives ation Component 1: Sustainable SUB 108-24 / Aquisição de Request for Single Stage - One 2018-12- 2019-05- 2018-12- 2019-06- 2019-01- 2019-06- TF / 18765 and Adaptive Community Post Limited 1,012.55 Completed engenho elétrico Quotations Envelope 01 02 26 07 25 28 Initiatives Component 1: Sustainable SUB 108-25 / Aquisição de Request for Single Stage - One 2018-12- 2019-04- 2018-12- 2019-04- 2019-01- 2019-05- TF / 18765 and Adaptive Community Post Limited 720.56 Completed notebook e impressora Quotations Envelope 01 08 26 12 25 29 Initiatives SUB 25-6 / CQ25.6 Aquisição de ferramentas e Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-09- 2018-07- materiais como botas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 04 26 23 chapéu arames ferro aço Initiatives ation cavadeira enxadas entre outros SUB 127-35 / Aquisição de gêneros para construtores Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-02- tradicionais e para evento TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 20 18 de inauguração do centro Initiatives ation de revitalização. SUB 127-36 / Aquisição de conjuntos (cama + box) - 2 Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-02- de casal e 8 de solteiro para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 20 18 estruturação do Centro de Initiatives ation Revitalização SUB 127-41 / Aquisição de artigos para estruturação da hospedaria do Centro de Revitalização da cultura e Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2018-12- 2019-02- visitação (lençóis de casal e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 20 18 solteiro, travesseiros, Initiatives ation cobertores de casal e solteiro, toalhas, fronhas, forro de mesa) SUB 75-5 / Aquisição de ferramentas básicas para Component 1: Sustainable Request for Single Stage - One 2018-12- 2019-07- 2018-12- 2019-08- 2019-01- 2019-08- construção do Projeto de TF / 18765 and Adaptive Community Post Limited 2,324.94 Completed Quotations Envelope 01 15 20 02 19 22 Turismo Sustentável, dos Initiatives Festejos Kalungas. SUB 75-6 / Aquisição de Ferramentas elétricas e de Component 1: Sustainable Alvenaria para construção Request for Single Stage - One 2018-12- 2020-01- 2018-12- 2020-01- 2019-01- 2020-07- TF / 18765 and Adaptive Community Post Limited 399.11 Completed do Projeto de Turismo Quotations Envelope 01 27 20 27 19 03 Initiatives Sustentável, para os festejos Kalungas. Component 1: Sustainable SUB 75-7 / Aquisição de Request for Single Stage - One 2018-12- 2019-07- 2018-12- 2019-08- 2019-01- 2019-08- TF / 18765 and Adaptive Community Post Limited 1,701.52 Completed materiais de irrigação Quotations Envelope 01 08 20 05 19 22 Initiatives SUB 75-8 / Aquisição de materiais de construção, Component 1: Sustainable Request for Single Stage - One 2018-12- 2019-06- 2018-12- 2019-06- 2019-01- 2019-07- para construção da sede do TF / 18765 and Adaptive Community Post Limited 8,865.62 Completed Quotations Envelope 01 11 20 18 19 01 Projeto de Turismo Initiatives Sustentável, para os Festejos Kalungas. SUB 75-9 / Aquisição de Component 1: Sustainable Pending materiais para construção Request for Single Stage - One 2018-12- 2018-12- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de lavanderia do Centro de Quotations Envelope 01 20 19 Initiatives ation Turismo Sustentável. SUB 75-10 / Aquisição de materiais hidráulicos para Component 1: Sustainable Request for Single Stage - One 2018-12- 2019-07- 2018-12- 2019-08- 2019-01- 2019-08- construção de banheiros, do TF / 18765 and Adaptive Community Post Limited 1,131.26 Completed Quotations Envelope 01 17 20 05 19 15 Centro de Turismo Initiatives Sustentável para os festejos Kalungas. AI3 - 5 / Aquisição de gêneros alimentícios para preparar refeição para as Component 1: Sustainable Community 2018-03- 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- mulheres quebradeiras de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 20 03 10 14 21 21 coco babaçu evento VIII Initiatives Development Encontrão das Quebradeiras de Coco Babaçu. BR-CAA-39554-GO-RFQ / Aquisição de notebooks para membros do Comitê Component 3: Project Request for Single Stage - One 2019-01- 2019-03- 2019-02- 2019-04- 2019-04- 2019-04- Gestor Nacional, para TF / 18765 Management, Monitoring Post Limited 6,834.14 Completed Quotations Envelope 24 28 14 17 15 25 realização de and Evaluation acompanhamento e monitoramento das atividades do projeto. SUB 110-2 / Aquisição de materiais rolos arame liso para cercamento e restauração de área com Component 1: Sustainable erosão, Construção de Request for Single Stage - One 2017-11- 2019-02- 2018-01- 2019-04- 2018-02- 2019-04- TF / 18765 and Adaptive Community Post Limited 2,899.41 Completed viveiro e sala de Quotations Envelope 25 28 19 16 28 17 Initiatives armazenamento de sementes - Grampo, Arame liso ovalado de aço zincado, Arame galvanizado, Tela de arame e outros necessários SUB 110-14 / Aquisição de Component 1: Sustainable postes de eucalipto tratado, Request for Single Stage - One 2017-08- 2019-03- 2017-08- 2019-03- 2017-09- 2019-04- TF / 18765 and Adaptive Community Post Limited 1,545.68 Completed Postes , Postes, Postes Quotations Envelope 02 01 25 15 29 15 Initiatives finos para paliçadas. SUB 110-35 / Fornecimento de gêneros Component 1: Sustainable alimentícios refeições para Request for Single Stage - One 2018-12- 2018-12- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled os trabalhadores que vão Quotations Envelope 05 26 25 Initiatives perfurar os buracos para fazer o cercamento das nascentes. SUB 110-30 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-09- 2018-09- 2018-10- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 25 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-31 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-10- 2018-10- 2018-11- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 05 26 25 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-33 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-11- 2018-11- 2018-12- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 25 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-32 / Fornecimento de gêneros Component 1: Sustainable Request for Single Stage - One 2018-11- 2018-11- 2018-12- alimentícios para 4 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 25 25 Reuniões mensais Initiatives organizativas e de monitoramento SUB 110-27 / Gêneros alimentícios para Component 1: Sustainable preparação de refeições Request for Single Stage - One 2017-08- 2019-02- 2017-08- 2019-02- 2018-01- 2019-03- TF / 18765 and Adaptive Community Post Limited 415.87 Completed para os participantes das Quotations Envelope 03 21 28 27 25 27 Initiatives reuniões/atividades do projeto. SUB 123-4 / 123.4 Contratação serviço fornecimento de Component 1: Sustainable combustível para: Gasolina Request for Single Stage - One 2018-04- 2019-03- 2018-05- 2019-04- 2019-12- 2019-07- TF / 18765 and Adaptive Community Post Limited 1,000.35 Completed para expedição de coleta e Quotations Envelope 15 07 08 03 29 01 Initiatives transporte de artesanato. Óleo 2tp para expedição de coleta e transporte de artesanato SUB 123 -6 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-03- 2019-03- 2018-04- 2019-03- 2018-06- 2019-05- 400 camisetas brancas para TF / 18765 and Adaptive Community Post Limited 1,598.19 Completed Quotations Envelope 28 11 10 19 11 29 uso na Oficina de Serigrafia. Initiatives SUB 123 -8 / Aquisição de gêneros alimentícios para Component 1: Sustainable Oficinas, Treinamentos, Request for Single Stage - One 2018-03- 2018-04- 2019-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Assembleias e demais Quotations Envelope 23 05 27 Initiatives atividades envolvendo a comunidade. SUB 123 -11 / Aquisição de materiais para produção de Component 1: Sustainable artesanato (miçangas, linha Request for Single Stage - One 2018-03- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled encerada, linha de nylon, Quotations Envelope 28 10 11 Initiatives agulha, feixos e ganchos, etc...) SUB 268 SC 01 / Aquisição Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-10- 2019-03- 2019-11- 2019-05- de ferramentas para TF / 18765 and Adaptive Community Post Limited 1,620.48 Signed Quotations Envelope 19 30 09 27 09 produção de artesanato em Initiatives madeira SUB 268 SC 02 / Aquisição de combustível (óleo diesel Component 1: Sustainable Pending Request for Single Stage - One 2019-02- 2019-03- 2020-01- e gasolina) para atividade TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 09 04 Aquisição de insumos para Initiatives ation produção dos artesanatos. Page 6 SUB 268 SC 04 / Aquisição de combustível (óleo diesel Component 1: Sustainable Pending e gasolina) para atividade Request for Single Stage - One 2019-02- 2019-03- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Realizar atividades de Quotations Envelope 19 09 04 Initiatives ation vigilância territorial da TI Menkü SUB 173 SC 003 / Aquisição de material de Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-08- 2019-03- 2019-09- 2019-04- 2019-10- construção para obra de TF / 18765 and Adaptive Community Post Limited 7,908.73 Completed Quotations Envelope 19 20 09 16 09 07 estruturação da unidade de Initiatives beneficiamento comunitária SUB 173 SC 006 / Component 1: Sustainable Pending Aquisição de material Request for Single Stage - One 2019-02- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement hidráulico para construção Quotations Envelope 19 09 09 Initiatives ation da unidade de beneficiamento SUB 173 SC 012 / Component 1: Sustainable Aquisição de despolpadeira Request for Single Stage - One 2019-05- 2019-05- 2019-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e fogão industrial para Quotations Envelope 09 27 27 Initiatives estruturação da unidade de beneficiamento. SUB 263 SC 001 / Component 1: Sustainable Aquisição de material de Request for Single Stage - One 2019-02- 2019-08- 2019-03- 2019-08- 2019-04- 2019-10- TF / 18765 and Adaptive Community Post Limited 7,378.24 Completed construção e acabamentos Quotations Envelope 19 08 09 16 09 01 Initiatives para reforma da casa de artesanato. SUB 250 SC 001 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-03- 2019-03- 2019-03- 2019-06- 2019-04- Aquisição de dois TF / 18765 and Adaptive Community Post Limited 1,027.13 Completed Quotations Envelope 19 07 09 07 08 06 notebooks para Initiatives estruturação da cooperativa SUB 45-3 / Aquisição de materiais de construção sendo areias, britas, tijolos, Component 1: Sustainable Request for Single Stage - One 2017-06- 2019-09- 2017-07- 2019-10- 2017-08- 2019-10- cimento, pedras e cal para TF / 18765 and Adaptive Community Post Limited 7,404.37 Completed Quotations Envelope 26 27 20 10 19 22 construir Unidade de Initiatives Beneficiamento de Produção de Azeite de Coco Babaçu. SUB 45-16 / Componentes de cozinha industrial: Luvas, Bacia de Alumínio, Colher grande e rasa de alumínio, Component 1: Sustainable Pending concha de alumínio grande, Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement bacia de alumínio grande, Quotations Envelope 28 19 18 Initiatives ation Colher de Pau grande, Caldeirão para cozimento inox, Tacho de alumínio de 100L e de 50L. SUB 45-24 / CT45.24 Aquisicao de generos alimenticios das comunidades para os Component 1: Sustainable treinamentos de Oficina de 2017-06- 2017-07- 2017-07- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled Gestao Organizacional 30 05 17 09 Initiatives Oficina de Planejamento Participativo Intercambio Curso de Seguranca do Trabalho Saude da Mulher dentre outros SUB 45-18 / CT45.18 Component 1: Sustainable Pending Aquisicao de mesa de Request for Single Stage - One 2017-07- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement granizo para manipulacao e Quotations Envelope 01 24 23 Initiatives ation envase do azeite SUB 45-20 / CT45.20 Component 1: Sustainable Pending Aquisicao de embalagens Request for Single Stage - One 2017-07- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement plasticas rotulos funis Quotations Envelope 01 20 19 Initiatives ation bacias e peneiras SUB 55-4 / CT55.4 Component 1: Sustainable Aquisicao de barraca feira Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para exposicao e venda dos Quotations Envelope 28 27 26 Initiatives produtos dos comunitarios SUB 179 SC 003 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-03- 2019-05- Aquisição de Materiais TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 19 09 09 Hidráulicos para construção Initiatives de obras SUB 211 SC 002 / Aquisição de materiais de Component 1: Sustainable Under Request for Single Stage - One 2019-02- 2020-08- 2019-03- 2019-04- construção/elétricos para TF / 18765 and Adaptive Community Post Limited 1,933.72 Implement Quotations Envelope 23 04 13 13 construção da Casa de Initiatives ation Cultura: SUB 211 SC 001 / Aquisição de: notebook, modem para replicação, Component 1: Sustainable datashow, lâmpada para Request for Single Stage - One 2019-02- 2019-10- 2019-03- 2019-10- 2019-04- 2019-10- TF / 18765 and Adaptive Community Post Limited 824.80 Completed datashow, impressora Quotations Envelope 23 16 13 16 13 30 Initiatives multifuncional, repetidor de sinal de internet para estruturação da Associação dos Artesões e extrativistas SUB 218 SC 003 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-04- 2019-03- 2019-04- 2019-04- 2019-08- Aquisição de linha para TF / 18765 and Adaptive Community Post Limited 906.06 Completed Quotations Envelope 19 16 09 26 09 30 bordado, diversas cores Initiatives SUB 218 SC 006 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-09- Aquisição de algodão TF / 18765 and Adaptive Community Post Limited 4,564.02 Completed Quotations Envelope 19 28 09 03 09 16 orgânica cardado cru Initiatives SUB 71-5 / CT71.5 Component 1: Sustainable Aquisicao de generos Request for Single Stage - One 2017-07- 2017-08- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled alimenticios para os Quotations Envelope 18 15 06 Initiatives encontros coletivos do projeto SUB 61-1 / CQ61.1 Aquisição de duas antenas Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-09- distribuidora de sinal antena TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 15 07 26 receptora de sinal e Initiatives duzentos metros de cabo de transmissão de dados Component 1: Sustainable SUB 61-2 / CQ61.2 Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Aquisicao de mesa inox Quotations Envelope 17 07 16 Initiatives SUB 61-3 / CQ61.3 Component 1: Sustainable Aquisição de quatro Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled armários para resfriamento Quotations Envelope 19 14 23 Initiatives de produtos com vinte bandejas cada SUB 93- 4 / Aquisiçao de Component 1: Sustainable Pending generos alimenticios para Request for Single Stage - One 2019-03- 2019-03- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement participantes durante Quotations Envelope 05 20 19 Initiatives ation implementaçao da horta SUB 61-9 / CQ61.9 Aquisição de quatro palletts Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-09- de plastico utilizado na TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 31 21 20 unidade de beneficiamento Initiatives e de trinta caixas plasticas brancas SUB 61-11 / CQ61.11 Component 1: Sustainable Request for Single Stage - One 2018-01- 2018-02- 2018-03- Aquisição de mil sacos de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 24 16 18 rafia Initiatives SUB 61-13 / CQ61.13 Aquisição de materiais de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- escritório e didáticos para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 25 24 uma capacitação de boas Initiatives praticas SUB 61-15 / CQ61.15 Component 1: Sustainable Aquisição de um programa Request for Single Stage - One 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de edição de vídeo Quotations Envelope 09 04 04 Initiatives compatível sony vegas SUB 93- 9 / Aquisição de gêneros alimentícios para Component 1: Sustainable Pending Request for Single Stage - One 2019-03- 2019-03- 2019-05- participantes durante TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 05 22 01 Manutenção do viveiro e Initiatives ation preparo de mudas SUB 93- 8 / Aquisição de gêneros alimentícios para Component 1: Sustainable Pending participantes durante Request for Single Stage - One 2019-03- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Expedição para coleta de Quotations Envelope 05 22 21 Initiatives ation sementes em sistema de mutirão SUB 113- 22 / Aquisição de Component 1: Sustainable insumos para povoamente Request for Single Stage - One 2019-03- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de coméia e implantação de Quotations Envelope 10 21 20 Initiatives apiário SUB 113- 24 / Aquisiçao de 2 kits para instalaçao de viveiros (Telas de Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-05- sombreamento, Arames, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 14 25 24 pregos, catracas, Initiatives mangueiras, gotejadores, microaspersores, fios eletricos, conexoes etc.) SUB 250-3 / Aquisição de 1200, Garrafas de vidros Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-09- 2019-03- 2019-09- 2019-05- 2019-10- 500ml, 700 Garrafas de TF / 18765 and Adaptive Community Post Limited 911.13 Completed Quotations Envelope 21 03 18 10 16 11 vidros 250ml + Tampas + Initiatives Lacres, para Azeite de Babaçu. SUB 250-4 / Aquisição de Component 1: Sustainable Pending 30 kits de vestuário de uso Request for Single Stage - One 2019-02- 2019-03- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement feminino - (Kit oculo, Quotations Envelope 23 18 16 Initiatives ation sapato, calça, aventa, touca). SUB 0- 1 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-10- 2019-03- 2019-10- 2019-04- 2019-12- mudas frutíferas e nativas TF / 18765 and Adaptive Community Post Limited 2,918.25 Completed Quotations Envelope 18 10 26 31 25 05 para replantio Initiatives SUB 0- 2 / Aquisição de kit Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-09- 2019-03- 2019-10- 2019-04- 2019-10- horta e materiais para TF / 18765 and Adaptive Community Post Limited 223.43 Completed Quotations Envelope 18 30 26 10 25 29 viveiro Initiatives SUB 26-9 / CT26.9 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-10- Aquisicao de sementes e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 12 07 06 mudas Initiatives SUB 170- 1 / Aquisiçao de notebook, Projetor Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-03- 2019-03- 2019-05- 2019-04- multimidia - data show, TF / 18765 and Adaptive Community Post Limited 2,212.81 Completed Quotations Envelope 18 06 26 06 25 06 Camera fotografica , Tela Initiatives com suporte para projeçao de data show SUB 210- 3 / Aquisição de Component 1: Sustainable equipamentos: computador, Request for Single Stage - One 2019-03- 2019-03- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled impressora, projetor e Quotations Envelope 16 24 23 Initiatives balança eletrônica SUB 210- 4 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-09- 2019-03- 2019-09- 2019-05- 2019-10- materiais para construçao TF / 18765 and Adaptive Community Post Limited 1,624.01 Completed Quotations Envelope 15 20 23 30 22 04 de viveiro Initiatives SUB 210- 5 / Aquisiçao de materiais para estruturaçao do viveiro: Caixa D'agua 400 L, Boia de Caixa D'agua, Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-04- Micro aspersor invertido, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 16 24 23 Bomba de agua submersa Initiatives completa, mangueira de Polietileno 3/4'', mangueira de Polietileno 1/2'' rolo de 50m, Pulverizadores Component 1: Sustainable SUB 30-36 / Aquisição de Request for Single Stage - One 2019-03- 2019-04- 2019-04- 2019-05- 2019-07- 2019-05- TF / 18765 and Adaptive Community Post Limited 3,074.71 Completed uma motocicleta Quotations Envelope 15 24 18 20 17 29 Initiatives SUB 105-9 / CQ105.9 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-07- 2017-09- Aquisição de duas mesas de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 13 31 04 escritório. Initiatives SUB 124 - 8 / Aquisição de touca protetora individual, aquisição de luvas de Component 1: Sustainable Community borracha,aquisição de 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled perneiras de proteção 29 12 19 22 01 30 Initiatives Development individual, aquisição de luvas de raspas, aquisição de botas para trabalho no campo. Component 1: Sustainable SUB 113-15 / Aquisição de Request for Single Stage - One 2017-09- 2019-03- 2017-10- 2019-04- 2018-01- 2019-04- TF / 18765 and Adaptive Community Post Limited 3,604.08 Completed 2 motos Quotations Envelope 29 29 30 15 30 26 Initiatives SUB 113- 23 / Caçamba Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-04- 2019-04- 2019-04- 2019-07- 2019-05- rural : semirreboques, para TF / 18765 and Adaptive Community Post Limited 1,732.44 Completed Quotations Envelope 24 12 14 29 13 10 transporte de mercadorias: Initiatives SUB 179 SC 002 / Veículo utilitário tipo camionete Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-05- 2019-03- 2019-06- 2019-04- 2019-07- pick -up, Motor: 1.4, TF / 18765 and Adaptive Community Post Limited 11,127.64 Completed Quotations Envelope 19 21 09 03 09 05 Combustível: Álcool e Initiatives Gasolina, Motor: No mínimo 120 cavalos SUB 210- 2 / Aquisiçao de veículo utilitário tipo camionete pick -up, Motor: Component 1: Sustainable 1.4, Combustível: Álcool e Request for Single Stage - One 2019-03- 2019-06- 2019-03- 2019-06- 2019-07- 2019-08- TF / 18765 and Adaptive Community Post Limited 11,175.64 Completed Gasolina, Motor: No mínimo Quotations Envelope 15 03 23 19 21 05 Initiatives 120 cavalos, Ano/modelo: 2015 a 2018, Portas: mínimo 02 (portas). SUB 26-3 / CT26.3 Component 1: Sustainable Request for Single Stage - One 2017-06- 2017-07- 2017-10- Aquisição de itens para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 24 18 16 construção do viveiro de Initiatives mudas SUB 120-15 / Aquisição de gêneros alimentícios Component 1: Sustainable adquiridos direto da 2017-10- 2017-11- 2017-11- 2018-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled comunidade para realização 20 03 21 06 Initiatives do encontro anual dos coletores do tix SUB 120-8 / Aquisição de Component 1: Sustainable gêneros alimentícios, para Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- TF / 18765 and Adaptive Community Post Limited 2,921.87 Completed encontro anual dos Quotations Envelope 20 07 03 17 02 27 Initiatives coletores do TIX. BR-CAA-110409-GO-RFQ / Aquisição de Bolsa para transporte de câmera Component 2: Capacity Pending profissional e acessórios Request for Single Stage - One 2019-04- 2019-05- 2019-06- TF / 18765 Building and Institutional Post Limited 0.00 Implement (lentes, carregador, bateria Quotations Envelope 29 16 15 Strengthening ation e cartão de memória) para uso durante acompanhamento do projeto DGM e subprojetos Component 1: Sustainable SUB 250-2 / Aquisição de Request for Single Stage - One 2019-02- 2019-08- 2019-03- 2019-08- 2019-06- 2019-08- TF / 18765 and Adaptive Community Post Limited 1,944.07 Completed 05 Forrageiras. Quotations Envelope 21 07 18 07 17 30 Initiatives BR-CAA-110418-GO-RFQ / Aquisição de materiais Component 2: Capacity Pending didáticos para as Request for Single Stage - One 2019-04- 2019-05- 2019-06- TF / 18765 Building and Institutional Post Limited 0.00 Implement capacitações e eventos do Quotations Envelope 29 16 15 Strengthening ation plano de capacitações do DGM que serão realizadas em 2019 SUB 124 - 5 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- kits de material didáticos TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 22 05 14 16 23 25 para capacitação. Initiatives Development SUB 124 - 11 / Aquisição de 1 Droner e duas Component 1: Sustainable baterias, para fazer o Request for Single Stage - One 2019-05- 2019-10- 2019-05- 2019-11- 2019-07- 2019-11- TF / 18765 and Adaptive Community Post Limited 2,694.56 Completed mapeamento e o Quotations Envelope 10 28 26 01 25 26 Initiatives diagnóstico de cada trecho a ser recuperado na terra indígena Araribé. BR-CAA-110424-GO-RFQ / Aquisição de materiais Component 2: Capacity pedagógicos específicos Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- TF / 18765 Building and Institutional Post Limited 161.73 Completed para o curso de Quotations Envelope 29 03 16 10 15 10 Strengthening Agroindústria a ser realizado em Montes Claros/MG Component 1: Sustainable Pending SUB 250-7 / Aquisição de Request for Single Stage - One 2019-04- 2019-05- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement 03 Fornos para Torrefação Quotations Envelope 29 16 14 Initiatives ation Component 1: Sustainable SUB 250-8 / Aquisição de Request for Single Stage - One 2019-04- 2020-01- 2019-05- 2020-01- 2019-08- 2020-02- TF / 18765 and Adaptive Community Post Limited 1,073.83 Completed 12 panelas de alumínio Quotations Envelope 29 16 16 29 14 28 Initiatives SUB 195 - 1 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-04- 2020-09- 2019-05- 2020-10- 2019-08- 2020-12- veículo tipo hatch, 1.0, TF / 18765 and Adaptive Community Post Limited 8,293.61 Completed Quotations Envelope 30 23 31 08 29 22 0KM. Initiatives BR-CAA-110415-GO-RFQ / Aquisição de 400 pen- Component 2: Capacity Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- 2019-05- drives para utilização dos TF / 18765 Building and Institutional Post Limited 2,884.94 Completed Quotations Envelope 29 08 16 10 15 13 participantes nos cursos de Strengthening capacitação do DGM SUB 218 SC 005 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-05- 2019-03- 2019-06- 2019-04- 2019-08- Aquisição de tecido de TF / 18765 and Adaptive Community Post Limited 1,957.69 Completed Quotations Envelope 19 20 09 03 09 16 algodão Initiatives Page 7 BR-CAA-110433-GO-RFQ / Aquisição de itens periféricos e acessórios de Component 3: Project Request for Single Stage - One 2019-06- 2019-06- 2019-06- 2019-06- 2019-09- informática, como mouses, TF / 18765 Management, Monitoring Post Limited 787.65 Signed Quotations Envelope 03 25 13 25 11 teclados, suportes de and Evaluation notebook componentes de computores - SSD e adpatadores SUB 56-5 / CT56.5 Component 1: Sustainable Aquisição de materiais para Request for Single Stage - One 2017-08- 2019-07- 2017-09- 2019-07- 2018-03- 2019-10- TF / 18765 and Adaptive Community Post Limited 5,542.35 Completed cercamento de nascente: Quotations Envelope 28 01 20 25 19 17 Initiatives arames (bola 500 metros). SUB 56-6 / CT56.6 Component 1: Sustainable Request for Single Stage - One 2017-07- 2019-07- 2017-08- 2019-07- 2019-06- 2019-09- Aquisição de postes de TF / 18765 and Adaptive Community Post Limited 7,098.60 Completed Quotations Envelope 22 01 14 25 15 06 eucalipto tratado para Initiatives cercamento de nascente SUB 218 - SC 007.2019 / Component 1: Sustainable Pending Contratação de serviços Request for Single Stage - One 2019-06- 2019-08- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para produção de folders, Quotations Envelope 16 11 08 Initiatives ation banners personalizadas. SUB 2120-1 / Aquisição de materiais de construção, Component 1: Sustainable Pending Request for Single Stage - One 2019-06- 2019-07- 2019-08- elétrico e hidráulico para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 24 17 17 construção da cozinha Initiatives ation comunitária SUB 201-1 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-07- 2019-07- 2019-07- 2019-10- 2019-11- 2019-10- um veículo, tipo pickup para TF / 18765 and Adaptive Community Post Limited 11,626.39 Completed Quotations Envelope 03 30 21 02 11 22 dois passageiros Initiatives SUB 201-2 / Gêneros alimentícios para Realizar o resgate e o fortalecimento da festa pon hy pry (bola Component 1: Sustainable Request for Single Stage - One 2019-06- 2019-09- 2019-07- 2019-10- 2019-09- 2019-10- confeccionada com palha de TF / 18765 and Adaptive Community Post Limited 3,953.37 Completed Quotations Envelope 28 30 19 07 20 11 milho); Gêneros alimentícios Initiatives para Festa do mentowaji (corrida de tora, flechas, cantorias a noite no pátio). SUB 241-4 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-08- bomba d'agua hidráulica e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Proposals Envelope 17 25 05 08 13 13 mangueira 32mm Initiatives SUB 56 - 20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-07- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- materiais de construção TF / 18765 and Adaptive Community Post Limited 1,101.26 Completed Quotations Envelope 02 10 26 17 27 22 para reforma da associação. Initiatives SUB 241-5 / Aquisição de matrizes de porcos caipira Component 1: Sustainable Pending Request for Single Stage - One 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-08- para implementação de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Proposals Envelope 17 25 05 09 13 13 sistema de produção de Initiatives ation porcos caipiras SUB 2120-3 / Aquisição de materiais para estruturação Component 1: Sustainable Pending Request for Single Stage - One 2019-06- 2019-08- 2019-08- da cozinha comunitária (Pias TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 24 04 18 inox, mesas inox, prateleira Initiatives ation de aço, armário de aço) SUB 211 SC 008 / Aquisição de móveis Component 1: Sustainable Pending (camas, estantes/armários, Request for Single Stage - One 2019-07- 2019-07- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement expositório com portas de Quotations Envelope 09 26 15 Initiatives ation vidro, jogo de sofá e cadeiras etc. SUB 211 SC 009 / Component 1: Sustainable Pending Aquisição de geladeira, Request for Single Stage - One 2019-07- 2019-07- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement freezers, máquina de lavar, Quotations Envelope 10 27 16 Initiatives ation forno micro-ondas etc. SUB 224 SC 002 / Component 1: Sustainable Request for Single Stage - One 2019-06- 2019-08- 2019-07- 2019-08- 2019-10- 2019-08- Aquisição de 01 TF / 18765 and Adaptive Community Post Limited 3,593.73 Completed Quotations Envelope 26 01 19 09 18 20 motocicletas para atividades Initiatives de vigilância SUB 224 SC 001 / Aquisição de um veículo utilitário tipo camionete Component 1: Sustainable pick -up, Motor: 1.4, Request for Single Stage - One 2019-06- 2019-07- 2019-07- 2019-07- 2019-10- 2019-09- TF / 18765 and Adaptive Community Post Limited 14,254.00 Completed Combustível: Álcool e Quotations Envelope 26 26 19 30 18 26 Initiatives Gasolina, Motor: No mínimo 120 cavalos, Ano/modelo: 2015 a 2018, Portas: mínimo 02 (portas) Component 1: Sustainable Pending SUB 75-12 / Aquisição de Request for Single Stage - One 2019-07- 2019-08- 2019-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement madeiras Quotations Envelope 30 10 12 Initiatives ation Component 1: Sustainable Pending SUB 28 - 2 / Aquisição de Request for Single Stage - One 2019-07- 2019-09- 2019-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement gêneros alimentícios Quotations Envelope 28 13 23 Initiatives ation SUB 169 -1 / Aquisição de Component 1: Sustainable Under Request for Single Stage - One 2019-07- 2019-08- 2019-09- 2020-03- equipamentos de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 29 24 22 Informática Initiatives ation SUB 61-21 / Aquisição de móveis para escritório: 01 arquivo para escritório com 04 gavetas R$ 600,00; 01 Component 1: Sustainable armário de escritório R$ Request for Single Stage - One 2019-08- 2019-08- 2019-09- 2019-09- 2019-11- 2019-10- TF / 18765 and Adaptive Community Post Limited 4,276.50 Completed 300,00; 01 armário balcão Quotations Envelope 22 01 12 09 03 18 Initiatives R$ 200,00; 20 cadeiras R$ 6.000,00; 01 cadeira de escritório R$ 300,00; 01 estrutura com 03 cadeiras R$ 500,00; SUB 61-22 / Aquisição de mesa inox; Aquisição de quatro armários para resfriamento de produtos Component 1: Sustainable Request for Single Stage - One 2019-08- 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- com 20 bandejas cada; TF / 18765 and Adaptive Community Post Limited 3,057.93 Completed Quotations Envelope 22 24 12 14 14 07 Aquisição de um Forno Initiatives Turbo com 10 bandejas; Aquisição de 12 facas de inox; 02 armários crescimento com 20 bandejas. SUB 75- SC 009-2019 / Aquisição de 2 caixas d Component 1: Sustainable Request for Single Stage - One 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2019-09- água 5 mil litros para os TF / 18765 and Adaptive Community Post Limited 1,052.55 Completed Quotations Envelope 29 22 21 02 06 03 Festejos Kalungas - Initiatives Comunidade Vão de Almas SUB 123-SC 012-2019 / Component 1: Sustainable Aquisição de combustível e Request for Single Stage - One 2019-08- 2019-10- 2020-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled óleo 2T para atividades de Quotations Envelope 23 18 15 Initiatives Assembléia Geral SUB 123 -SC 007.2019 / Component 1: Sustainable Aquisição de combustível Request for Single Stage - One 2019-08- 2019-10- 2020-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para expedições de coleta Quotations Envelope 23 18 15 Initiatives de material SUB 169-SC 001/2019 / Component 1: Sustainable Aquisição de materiais de Request for Single Stage - One 2019-09- 2019-08- 2019-10- 2019-09- 2019-11- 2019-10- TF / 18765 and Adaptive Community Post Limited 1,786.04 Completed construção e materiais Quotations Envelope 17 30 05 06 05 17 Initiatives elétricos e hidráulicos SUB 61-6 / CQ61.6 Component 1: Sustainable Request for Single Stage - One 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- 2020-01- Aquisição de uma TF / 18765 and Adaptive Community Post Limited 11,505.56 Completed Quotations Envelope 19 12 10 15 21 28 despolpadeira Initiatives SUB 263 SC 002 / Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-09- 2019-03- 2019-09- 2019-07- 2019-10- Aquisição de alimentação TF / 18765 and Adaptive Community Post Limited 2,050.52 Completed Quotations Envelope 19 13 09 30 08 01 durante a reforma da casa Initiatives do artesanato SUB 166 SC 015 / Aquisição de materiais de Component 1: Sustainable Pending construção, elétrico e Request for Single Stage - One 2019-09- 2019-09- 2019-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement hidráulicos para obra de Quotations Envelope 09 22 22 Initiatives ation cozinha para processamento de frutos do cerrado. SUB 166 SC 018 / Component 1: Sustainable Pending Aquisição de materiais Request for Single Stage - One 2019-10- 2019-10- 2019-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement elétricos para obra da Quotations Envelope 08 25 27 Initiatives ation cozinha para processamento de frutos SUB 75 - 13 / Aquisição de materiais de construção Component 1: Sustainable Request for Single Stage - One 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- para continuação da obra TF / 18765 and Adaptive Community Post Limited 1,765.45 Completed Quotations Envelope 04 07 20 11 19 29 para estruturação do espaço Initiatives comunitário. SUB 169 -2 / Aquisição de móveis e eletrodomésticos Component 1: Sustainable para equipar o centro Request for Single Stage - One 2019-10- 2019-10- 2019-11- 2019-10- 2020-05- 2019-11- TF / 18765 and Adaptive Community Post Limited 1,229.19 Completed comunitário: geladeira 300l; Quotations Envelope 01 07 26 09 24 11 Initiatives ventiladores; Cadeiras de escritorio; Bebedouro e mesas Component 1: Sustainable SUB 170 - 6 / aquisição de Request for Single Stage - One 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- TF / 18765 and Adaptive Community Post Limited 2,066.10 Completed ferramentas agrícolas Quotations Envelope 09 08 14 16 14 12 Initiatives SUB 85 -13 / Aquisição de Component 1: Sustainable Community 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- caixa de papel A4, Sacos TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 10 24 02 05 10 13 de papel kraft 1/2 kg 1000 Initiatives Development un. Component 1: Sustainable Community SUB 85 -15 / Aquisição de 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-10- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled gêneros alimentícios. 12 26 05 06 12 07 Initiatives Development SUB 85-15 / Materiais de Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-11- 2019-12- construção e elétrico para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 27 27 construção do viveiro Initiatives ation SUB 16-8 / CQ16-8 Aquisição de ferramentas e Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-10- materiais elétricos TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 23 23 hidráulicos e para Initiatives implantação produção agroecológica e horta. SUB 16-23 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-10- 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- caixa d'água de 20.000 TF / 18765 and Adaptive Community Post Limited 1,365.96 Completed Quotations Envelope 13 27 01 10 01 02 litros para instalação no Initiatives viveiro SUB 3-1 / aquisição de Component 1: Sustainable combustíveis para ser Request for Single Stage - One 2017-08- 2017-09- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled utilizado para o plantio de Quotations Envelope 25 29 20 Initiatives mudas e coletas de sementes. SUB 3-2 / Aquisição de kit Component 1: Sustainable Request for Single Stage - One 2018-07- 2018-08- 2018-10- de material de construção TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 23 28 29 (areia, cimento, pedra, Initiatives telha, etc.) SUB 98-18 / Aquisição de gêneros alimentícios para Component 1: Sustainable Request for Single Stage - One 2018-12- 2018-12- 2019-02- mutirão durante a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 24 22 construção da casa de Initiatives cultura e cercamento das nascentes. Component 1: Sustainable Community SUB 98 -6 / Aquisição de 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled móveis para escritório. 13 27 03 05 15 16 Initiatives Development Component 1: Sustainable SUB 55-1 / CT55.1 Request for Single Stage - One 2019-10- 2019-11- 2019-11- 2019-12- 2020-02- TF / 18765 and Adaptive Community Post Limited 20,776.86 Signed Aquisicao de Container Quotations Envelope 08 21 01 10 29 Initiatives SUB 127-26 / Aquisicao de Component 1: Sustainable Request for Single Stage - One 2017-12- 2017-12- 2018-01- arreios e demais acessorios TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 18 07 para montaria Initiatives SUB 127-37 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2018-12- 2018-12- 2019-02- 3 equinos para passeios TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 01 20 18 turísticos Initiatives SUB 30 - 14 / Aquisição de balaios para transporte de sementes, tesouras para sebes, tesouras de podar e Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- ferramentas semelhantes, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 13 30 30 manipuladas com as duas Initiatives mãos, adubo químico 4-14- 8 e regador de água para plantas . SUB 30 - 16 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-11- areia lavada do rio, calhaus, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 17 17 cascalho, pedras britadas. Initiatives SUB 30 - 17 / Aquisição de móveis de escritório sendo: Component 1: Sustainable mesa de reunião com 4 Request for Single Stage - One 2017-10- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled cadeiras, mesa e cadeira de Quotations Envelope 16 01 01 Initiatives escritório, armário para escritório, armário em aço. SUB 30 - 18 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- bebedouro refrigerador TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 02 18 18 industrial 50 l com filtro Initiatives SUB 30 - 19 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-11- 02 (dois) Botijões de gás 13 TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 17 17 kg Initiatives Component 1: Sustainable SUB 30 - 23 / Aquisição de Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled 01 (uma) câmara digital. Quotations Envelope 29 16 16 Initiatives Component 1: Sustainable SUB 30 - 25 / Aquisições Request for Single Stage - One 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de Telhas de eternit. Quotations Envelope 02 18 18 Initiatives SUB 30 - 28 / Aquisição de kit de antenas receptoras Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- com baterias, placas TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 21 21 solares,cabos e demais Initiatives equipamentos para comunicação via internet. SUB 30 - 29 / Aquisição de kit de equipamentos de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- segurança contendo botas, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 12 30 20 luvas, óculos, chapéu de Initiatives palha e avental. Component 1: Sustainable SUB 30 - 31 / Aquisição Request for Single Stage - One 2017-11- 2018-12- 2017-11- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled saco plástico preto Quotations Envelope 03 12 20 11 Initiatives Component 1: Sustainable SUB 30 -22 / Aquisição de Request for Single Stage - One 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled cimentos e argamassas. Quotations Envelope 02 19 20 Initiatives SUB 98 -7 / Aquisição de equipamentos de Component 1: Sustainable informática, sendo: 01 Request for Single Stage - One 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,087.58 Signed impressoras, 01 notebooks, Quotations Envelope 23 17 02 19 17 Initiatives 01 Tela com suporte para projeção de data show, 01 Projetor multimidia. SUB 210-3 NOVA / Aquisicao de equipamentos: Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-03- 2019-03- 2019-05- 2019-03- computador, impressora, TF / 18765 and Adaptive Community Post Limited 1,278.43 Completed Quotations Envelope 03 13 14 13 13 27 projetor - para estruturacao Initiatives da associacao. SUB 139-2 / Aquisição de equipamentos para estruturação da cozinha comunitária: um fogão Component 1: Sustainable Pending Request for Single Stage - One 2019-10- 2019-11- 2020-01- industrial a gás; forno à gás; TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 09 08 liquidificador industrial para Initiatives ation o beneficiamento de alimentos e refrigeradores tipo domésticos, tabuleiro de inox. SUB 139-3 / Aquisição de material de consumo para Component 1: Sustainable Pending realização de oficinas de Request for Single Stage - One 2019-10- 2019-11- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement capacitações e reuniões de Quotations Envelope 27 11 11 Initiatives ation planejamento: papel, canetas, canetões, etc. SUB 139-4 / Aquisição de gêneros alimentícios para Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-01- 2020-02- atividade de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 12 25 24 Avaliação/Aprovação do Initiatives ation Plano de Gestão Ambiental SUB 110-13 / CQ110.13 Aquisição de equipamentos para a infraestrutura do Component 1: Sustainable Pending viveiro como Termômetro Request for Single Stage - One 2019-11- 2019-11- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de vara Motobomba Sistema Quotations Envelope 04 17 27 Initiatives ation de irrigação Medidor de umidade de solo entre outros necessários SUB 110-3 / Aquisição de matérias hidraulicos para Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-11- 2019-12- construção do viveiro e sala TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 14 14 de armazenamento de Initiatives ation sementes Page 8 SUB 16-24 / Aquisição de Component 1: Sustainable Pending combustível para trator - Request for Single Stage - One 2019-10- 2019-11- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção de curvas de Quotations Envelope 30 10 10 Initiatives ation nível e bacias de contenção SUB 166 SC 006 / Aquisição de batedor ou processador tritura gelo, Component 1: Sustainable Under Request for Single Stage - One 2019-11- 2020-08- 2019-11- 2020-01- liquidificador com copo TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 12 20 19 completo inox, Balança Initiatives ation digital eletrônica, Balança digital, refrigerador grande e freezer horizontal. SUB 166 SC 010 / Aquisição de itens para estruturação da cozinha: talheres grandes para Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-11- 2020-01- cozinha, jogo de panela, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 20 19 conjunto talheres de mesa, Initiatives ation concha térmica para sorvete, conjunto de pratos de louça, copos tipo americanos, lixeira. Component 1: Sustainable SUB 170 - 7 / Mudas Request for Single Stage - One 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- TF / 18765 and Adaptive Community Post Limited 1,165.06 Completed frutíferas nativas Quotations Envelope 06 04 21 17 20 18 Initiatives SUB 263 - 4 / Aquisição de Component 1: Sustainable materiais fabricação Request for Single Stage - One 2019-11- 2019-11- 2019-11- 2019-11- 2020-01- 2019-11- TF / 18765 and Adaptive Community Post Limited 1,397.08 Completed artesanatos, como Quotations Envelope 06 05 17 07 16 18 Initiatives barbantes, linhas, lastex e cordões SUB 263 - 5 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-11- 2019-11- 2019-11- 2019-11- 2020-01- 2020-02- miçangas para produção de TF / 18765 and Adaptive Community Post Limited 1,048.58 Completed Quotations Envelope 06 19 17 21 16 01 artesanato Initiatives SUB 100 - 3 / Aquisição de Component 1: Sustainable Community 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- kit equipamento proteção TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 20 03 10 15 22 20 individual. Initiatives Development SUB 100-18 / Aquisição de Component 1: Sustainable Pending vestimentas de proteção Request for Single Stage - One 2019-11- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement individual: calças, camisetas Quotations Envelope 08 21 20 Initiatives ation e chapéus com proteção Component 1: Sustainable Pending SUB 100-19 / Aquisição de Request for Single Stage - One 2019-11- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Botas - EPI's Quotations Envelope 08 21 20 Initiatives ation Component 1: Sustainable SUB 110-36 / Aquisição de Request for Single Stage - One 2019-11- 2019-11- 2019-11- 2019-12- 2020-01- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,064.57 Completed adubo orgânico para plantio Quotations Envelope 08 21 21 04 20 20 Initiatives SUB 268 - 8 / Aquisição de material de construção para Component 1: Sustainable Request for Single Stage - One 2019-11- 2019-11- 2019-12- espaço sede para a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 21 21 cooperativa/ associação Initiatives indígena SUB 166 SC 004 / Aquisição de Seladora de Component 1: Sustainable embalagens plásticas a Request for Single Stage - One 2019-11- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled vácuo e despolpadeira de Quotations Envelope 04 17 16 Initiatives fruta , para estruturação da cozinha de processamento. SUB 74-13 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-12- câmera de ação, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 05 06 profissional. Initiatives SUB 74-14 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- utensílios para cozinha TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 21 14 comunitária Initiatives SUB 74-15 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- kits de material didático TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 07 21 14 para Oficinas Initiatives Component 1: Sustainable SUB 74-17 / Aquisição de Request for Single Stage - One 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled calças e botas Quotations Envelope 25 08 30 Initiatives SUB 47-5 / Aquisição de kit de materiais didáticos Component 1: Sustainable (caneta,papel Request for Single Stage - One 2019-03- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled madeira,pastas, cartolina, Quotations Envelope 05 19 08 Initiatives lápis de cor,bloco de anotação, borracha,lápis de escrever, pincel e papel A4 SUB 173 - 13 / Aquisição de material de construção Component 1: Sustainable Request for Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- (complemento) para TF / 18765 and Adaptive Community Post Limited 1,214.10 Completed Quotations Envelope 23 26 05 09 04 17 estruturação da unidade de Initiatives beneficiamento comunitária SUB 47-10 / Aquisição de materiais de construção para conclusão dos Component 1: Sustainable Request for Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- banheiros e parte do TF / 18765 and Adaptive Community Post Limited 1,340.67 Completed Quotations Envelope 23 22 04 03 19 05 acabamento da unidade de Initiatives beneficiamento como forros, areia, cimento, entre outros. SUB 98-20 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-11- 2020-01- 2019-12- 2020-02- 2020-05- 2020-02- material de irrigação para TF / 18765 and Adaptive Community Post Limited 1,134.54 Completed Quotations Envelope 22 31 03 17 31 24 viveiro e horta comunitária Initiatives SUB 25-18 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-12- 2020-01- materiais de construção TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 06 20 para obra do galpão Initiatives ation comunitário Component 1: Sustainable SUB 98-19 / Aquisição de Request for Single Stage - One 2018-12- 2020-02- 2018-12- 2020-03- 2019-01- 2020-03- TF / 18765 and Adaptive Community Post Limited 4,082.13 Completed materiais de construção Quotations Envelope 01 18 22 04 21 09 Initiatives SUB 210- 7 / Aquisição de materiais para implantação de hortas: adubo organico, Cálcario agricola, tesoura Component 1: Sustainable Pending de poda, Rolo tela de Arame Request for Single Stage - One 2019-12- 2020-01- 2020-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement 1,80x50m, exadao com Quotations Envelope 17 10 10 Initiatives ation cabo, enxada com cabo, cavadeira articulada, mangueira 1/3 para irrigacao de gotejamento, boia de caixa d'água SUB 210- 8 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- material para produção de TF / 18765 and Adaptive Community Post Limited 1,783.17 Completed Quotations Envelope 17 09 03 23 04 13 artesanato Initiatives SUB 224 SC 003 / Aquisição de equipamentos Component 1: Sustainable Under para gestão do projeto e Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2020-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement uso da brigada voluntária: Quotations Envelope 24 20 10 10 Initiatives ation Gps, Rádio comunicador e Câmera fotográfica. SUB 201- 3 / Aquisição de Gêneros alimentícios para Realizar o resgate e o Component 1: Sustainable fortalecimento da festa pon Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,831.82 Completed hy pry (bola confeccionada Quotations Envelope 13 17 03 18 06 27 Initiatives com palha de milho) e resgate e o fortalecimento da festa rurut (esteira). SUB 129 -16 / Aquisição de câmera fotográfica, câmera Component 1: Sustainable Under Request for Single Stage - One 2019-12- 2020-01- 2020-03- filmadora, GPS, móveis de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 29 29 escritório (mesa e cadeiras) Initiatives ation e notebook Component 1: Sustainable SUB 71-13 / Request for Single Stage - One 2019-12- 2020-06- 2020-01- 2020-06- 2020-02- 2020-07- TF / 18765 and Adaptive Community Post Limited 2,522.70 Completed Monocultivador Quotations Envelope 28 09 22 18 21 03 Initiatives Component 1: Sustainable Under SUB 61-25 / Aquisição de Request for Single Stage - One 2020-01- 2020-05- 2020-01- 2020-03- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Estufa de secagem Quotations Envelope 02 26 29 09 Initiatives ation AI2-5 / Aquisição de kits Component 1: Sustainable Pending para agricultura: enxadas, Request for Single Stage - One 2020-01- 2020-01- 2020-03- TF / 18765 and Adaptive Community Post Limited 0.00 Implement picaretas, pás, carrinho de Quotations Envelope 11 25 25 Initiatives ation mão, etc AI2-9 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-02- 2020-03- combustível para moto TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 01 02 bomba Initiatives ation AI2-12 / Aquisição de Component 1: Sustainable generos alimentícios para Request for Single Stage - One 2020-01- 2020-02- 2020-01- 2020-03- 2020-02- TF / 18765 and Adaptive Community Post Limited 569.32 Signed assembleia geral do povo Quotations Envelope 09 27 24 05 23 Initiatives Terena AI2-13 / Aquisição de câmera fotográfica Component 1: Sustainable Under Request for Single Stage - One 2020-01- 2020-06- 2020-02- 2020-04- profissional e lente para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 10 04 04 fortalecimento/estruturação Initiatives ation Articulação Pacary SUB 56 - 21 / Aquisição de Component 1: Sustainable equipamentos para Request for Single Stage - One 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- TF / 18765 and Adaptive Community Post Limited 2,646.53 Completed funcionamento do poço Quotations Envelope 30 30 13 12 14 13 Initiatives artesiano comunitário. SUB 110-4 / Aquisição de materiais para construção do viveiro e sala de armazenamento de semente Component 1: Sustainable Request for Single Stage - One 2017-09- 2020-01- 2017-10- 2020-02- 2018-01- 2020-03- e reformar do banheiro para TF / 18765 and Adaptive Community Post Limited 2,406.82 Completed Quotations Envelope 23 28 17 21 15 10 dar suporte ao viveiro, Initiatives Materias construção diversos, Ripa plainada de 4metros, Tinta pva branca externa. SUB 110-37 / Aquisição de materiais elétricos para construção do viveiro e sala Component 1: Sustainable Request for Single Stage - One 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- de armazenamento de TF / 18765 and Adaptive Community Post Limited 344.20 Completed Quotations Envelope 07 28 02 17 01 13 semente e reforma do Initiatives banheiro para dar suporte ao viveiro BR-CAA-156151-GO-RFQ / Aquisição de materiais Component 2: Capacity Pending pedagógicos (ingredientes) Request for Single Stage - One 2020-02- 2020-02- 2020-03- TF / 18765 Building and Institutional Post Limited 0.00 Implement específicos para o curso de Quotations Envelope 04 16 17 Strengthening ation plantas medicinais - Plano de Capacitação DGM Brasil BR-CAA-156152-GO-RFQ / Aquisição de materiais de Component 2: Capacity Pending higiente e proteção para Request for Single Stage - One 2020-02- 2020-02- 2020-03- TF / 18765 Building and Institutional Post Limited 0.00 Implement manipulção durante o curso Quotations Envelope 05 17 18 Strengthening ation de plantas medicinais - Plano de Capacitação do DGM Brasil Component 1: Sustainable SUB 134 -16 / Aquisição de Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- TF / 18765 and Adaptive Community Post Limited 2,842.94 Signed roda d´água com bomba Quotations Envelope 01 11 12 17 27 Initiatives SUB 263 - 6 / Aquisição de equipamentos para estruturação da casa de Component 1: Sustainable Pending Request for Single Stage - One 2020-02- 2020-02- 2020-02- artesanato: 2 armários de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 07 18 19 aço; geladeira comum 300l; Initiatives ation bebedouro; fogão industrial, com forno à gás. SUB 263 - 7 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- máquina de costura reta e TF / 18765 and Adaptive Community Post Limited 772.22 Completed Quotations Envelope 04 10 16 12 26 03 máquina de costura Initiatives overlock SUB 216 - 2 / Aquisição de Component 1: Sustainable 3 GPS, 3 Notebooks e 1 Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-06- 2020-02- TF / 18765 and Adaptive Community Post Limited 242.70 Signed câmera fotográfica para Quotations Envelope 04 13 14 13 24 Initiatives estruturar o Conselho Terena Component 1: Sustainable SUB 30 - 37 / Aquisição de Request for Single Stage - One 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-03- TF / 18765 and Adaptive Community Post Limited 2,148.80 Completed Materiais de Construção Quotations Envelope 18 14 26 27 28 19 Initiatives SUB 30 - 38 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-03- 2020-05- 2020-04- 2020-05- 2020-06- 2020-08- móveis para escritório, TF / 18765 and Adaptive Community Post Limited 1,049.61 Completed Quotations Envelope 25 19 06 29 05 05 como: armários, mesas e Initiatives cadeiras SUB 268 -2 / Aquisição de material de construção para construção do galpão para Component 1: Sustainable Request for Single Stage - One 2020-03- 2020-09- 2020-04- 2020-10- 2020-05- fabricação de artesanato e TF / 18765 and Adaptive Community Post Limited 3,229.69 Signed Quotations Envelope 25 21 07 07 07 armazenamento da matéria- Initiatives prima e construção da sede da associação. SUB 250-5 / Aquisição de Component 1: Sustainable Pending 10 Armários / Roupeiros, Request for Single Stage - One 2020-03- 2020-04- 2020-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Aquisição de 10 estantes de Quotations Envelope 25 19 17 Initiatives ation ferro SUB 195 - 3 / Aquisição de Component 1: Sustainable Pending gêneros alimentícios para Request for Single Stage - One 2020-03- 2020-04- 2020-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement preparo das refeições Quotations Envelope 25 07 07 Initiatives ation durante atividades do projeto SUB 268 -9 / Aquisição de Component 1: Sustainable Pending ferramentas para produção Request for Single Stage - One 2020-03- 2020-04- 2020-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de artesanato: Quotations Envelope 25 06 05 Initiatives ation esmeriladeiras, etc (aquisição complementar) SUB 99 - 20 / Bombas Component 1: Sustainable Pending Request for Single Stage - One 2020-03- 2020-04- 2020-05- Submersa para poço TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 22 22 artesiano com placa solar Initiatives ation SUB 120 - 18 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-04- 2020-04- 2020-05- de celulares par o TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 03 21 21 subprojeto Initiatives ation Component 1: Sustainable Pending SUB 116.25 / Aquisição de Request for Single Stage - One 2020-04- 2020-05- 2020-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement roçadeira Quotations Envelope 05 02 01 Initiatives ation SUB 113 - 30 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-04- 2021-01- 2020-05- 2021-01- 2020-06- 2021-05- de equipamentos para TF / 18765 and Adaptive Community Post Limited 2,212.18 Completed Quotations Envelope 17 14 16 25 05 13 extração de mel Initiatives Component 1: Sustainable SUB 113 - 31 / Aquisição Request for Single Stage - One 2020-04- 2021-01- 2020-05- 2021-01- 2020-06- 2021-02- TF / 18765 and Adaptive Community Post Limited 881.48 Completed de Freezers Quotations Envelope 17 06 05 18 04 17 Initiatives BR-CAA-175571-GO-RFQ Component 3: Project Pending / Aquisição de um notebook Request for Single Stage - One 2020-05- 2020-06- 2020-07- TF / 18765 Management, Monitoring Post Limited 0.00 Implement para membro do Comite Quotations Envelope 29 09 09 and Evaluation ation Gestor Nacional SUB 100 - 20 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-05- 2020-07- 2020-06- 2020-07- 2020-07- 2020-08- de tachos de ferro para TF / 18765 and Adaptive Community Post Limited 3,529.30 Completed Quotations Envelope 28 10 11 22 11 12 produção de farinha Initiatives SUB 129 - 17 / Aquisição de peças de reposição para Component 1: Sustainable Request for Single Stage - One 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-08- veículo de apoio às TF / 18765 and Adaptive Community Post Limited 2,629.73 Completed Quotations Envelope 04 12 15 16 15 05 atividades de vigilância e Initiatives fiscalização da Terra Indígena Krahô. SUB 91-11 / Aquisição de Component 1: Sustainable implemento agrícola - Request for Single Stage - One 2020-06- 2020-06- 2020-07- 2020-07- 2020-07- 2020-09- TF / 18765 and Adaptive Community Post Limited 1,837.78 Completed Grade Aradora Mecânica Quotations Envelope 26 19 16 01 22 11 Initiatives para o subprojeto 91 SUB 109-8 / CT109.8 Component 1: Sustainable Pending Aquisição de Moinho para Request for Single Stage - One 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement unidade de beneficiamento Quotations Envelope 05 29 28 Initiatives ation do subprojeto SUB 109-5 / CT109.5 Component 1: Sustainable Pending Aquisição de equipamentos Request for Single Stage - One 2017-09- 2017-10- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para a unidade de Quotations Envelope 11 04 01 Initiatives ation beneficiamento SUB 170 - 8 / Aquisição de Component 1: Sustainable ferramentas agrícolas para Request for Single Stage - One 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- TF / 18765 and Adaptive Community Post Limited 1,958.62 Completed implementação dos Quotations Envelope 13 13 25 22 24 03 Initiatives pomares e roça coletiva SUB 170 - 9 / Aquisição de Component 1: Sustainable gêneros alimentícios Request for Single Stage - One 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- TF / 18765 and Adaptive Community Post Limited 221.54 Completed durante o trabalho na Quotations Envelope 13 13 25 22 24 03 Initiatives criação de pomares e roça coletiva SUB 2120 - 5 / Aquisição de freezer horizontal 385 Component 1: Sustainable Pending Request for Single Stage - One 2020-07- 2020-07- 2020-08- litros, Geladeira 400 L para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 25 24 estruturação de cozinha Initiatives ation comunitária. Page 9 SUB 2120 - 6 / Aquisição de balança digital, seladora Component 1: Sustainable Pending Request for Single Stage - One 2020-07- 2020-07- 2020-08- automática industrial, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 28 27 despolpadeira de frutas 10 Initiatives ation litros, seladora à vácuo. SUB 211 SC 010 / Component 1: Sustainable Pending Aquisição de: Request for Single Stage - One 2019-07- 2019-07- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Liquidificadores de alta Quotations Envelope 09 17 16 Initiatives ation rotação, batedeira industrial e fogão industrial SUB 211 - SC 011 / Component 1: Sustainable Pending Request for Single Stage - One 2020-07- 2020-07- 2020-08- Aquisição de máquina para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 25 24 fabricação de sorvete e Initiatives ation picolé SUB 91 - 10 / Aquisição de equipamentos Component 1: Sustainable Pending Request for Single Stage - One 2020-07- 2020-08- 2020-08- complementares para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 03 23 instalação do bombeamento Initiatives ation de água SUB 241-7 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-08- 2020-09- bomba d'água com placas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 03 17 16 solares Initiatives ation SUB 241-8 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-08- 2020-09- kit para irrigação e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 13 12 mangueira Initiatives ation AI2 - 14 / Kit de irrigação Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-10- 2020-08- 2020-10- 2020-09- 2021-01- para instalar o campo de TF / 18765 and Adaptive Community Post Limited 1,097.02 Completed Quotations Envelope 03 19 15 22 14 28 sementes Initiatives AI2 - 15 / Aquisição de Component 1: Sustainable material de construção para Request for Single Stage - One 2020-08- 2020-10- 2020-08- 2020-10- 2020-08- 2021-01- TF / 18765 and Adaptive Community Post Limited 2,167.06 Completed instalação de reservatório Quotations Envelope 03 08 12 16 27 28 Initiatives de água SUB 170 - 10 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- de mudas para TF / 18765 and Adaptive Community Post Limited 1,014.92 Completed Quotations Envelope 03 31 17 05 06 13 reflorestamento Initiatives AI2- 16 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2020-09- material para instalação de TF / 18765 and Adaptive Community Post Limited 1,939.96 Completed Quotations Envelope 09 25 20 03 19 25 viveiros Initiatives Component 1: Sustainable Pending AI2 -18 / Aquisição de Request for Single Stage - One 2020-08- 2020-08- 2020-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement mudas e sementes variadas Quotations Envelope 09 23 12 Initiatives ation SUB 45 - 26 / Aquisição de equipamentos de Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-09- 2020-10- informática: computador de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 15 15 mesa, notebook, projetor Initiatives ation multimídia, entre outros SUB 124 - 15 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-09- 2020-10- de micro-trator com TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 09 09 caçamba Initiatives ation AI2 - 19 / Aquisição de aparelhos eletrônicos para Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-09- 2020-11- gravação e eventos, como: TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 08 07 celular, caixa de som, tripé Initiatives ation e microfone. AI2 - 20 / Aquisição de equipamentos para Component 1: Sustainable Pending gravação, filmagem e Request for Single Stage - One 2020-08- 2020-09- 2020-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement fotografia como: lente para Quotations Envelope 26 08 07 Initiatives ation câmera, tripé, iluminador, bateria para câmera. AI2 - 21 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2021-01- itens para instalação de TF / 18765 and Adaptive Community Post Limited 2,869.94 Completed Quotations Envelope 26 25 06 29 06 28 sistema de irrigação Initiatives AI2 - 22 / Aquisição de combustível para manutenção de roça de Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-09- 2020-10- subsistência para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 03 03 fortalecimento de segurança Initiatives ation alimentar nas terras indígenas Cachoeirinha, Lalima e Pilad Rebuá SUB 179 - 10 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-04- 2020-06- 2020-05- 2020-06- 2020-05- 2020-08- de materiais para TF / 18765 and Adaptive Community Post Limited 2,011.04 Completed Quotations Envelope 17 19 06 26 26 05 construção dos galinheiros Initiatives SUB 179 - 11 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-09- 2020-09- 2020-10- de insumos para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 11 25 15 estruturação das hortas Initiatives ation comunitárias Component 1: Sustainable SUB 108 - 30 / Aquisição Request for Single Stage - One 2020-10- 2020-10- 2020-10- 2020-10- 2020-12- 2020-11- TF / 18765 and Adaptive Community Post Limited 1,343.02 Completed de gerador Quotations Envelope 03 03 24 03 23 18 Initiatives SUB 123 - 13 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-10- 2020-12- de materiais para produção TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 21 20 de artesanato - miçangas Initiatives ation COVID 19 - RS27 PRO TERRA / Aquisição de itens Component 1: Sustainable Pending de higiene e proteção Request for Single Stage - One 2020-10- 2020-10- 2020-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement individual: álcool em gel, Quotations Envelope 09 24 13 Initiatives ation água sanitária, sabão em barra, máscaras, detergente e sabonete COVID 19 - RS50 PEDRA PRETA / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- individual: máscaras, água TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 24 13 sanitária, álcool em gel, Initiatives ation sabonete, detergente, sabão em pó e papel higiênico. COVID 19 - RS54 CIMQCB / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- individual: medidor de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 24 13 temperatura, totem para Initiatives ation alcool em gel, alcool em gel, máscaras, água sanitária e sabão em barra COVID 19 - RS44 ASSEMA / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- individual: sabão de coco, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 24 13 sabonete, alcool gel, água Initiatives ation sanitária, desinfetante, sabão líquido, sabão em pó, máscaras de tecido SUB 110 - 37 / Aquisição Component 1: Sustainable de uma moto serra e um Request for Single Stage - One 2020-10- 2020-10- 2020-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled triturador de galhos e Quotations Envelope 09 31 30 Initiatives troncos para equipar a associação AI2 - 23 / Aquisição de Component 1: Sustainable 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-12- 2020-11- sementes orgânicas e não- TF / 18765 and Adaptive Community Post Direct Selection Direct 940.72 Completed 11 20 16 24 22 27 21 05 transgênicas certificadas. Initiatives SUB 28 - 18 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- materiais para sistema de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 08 08 irrigação Initiatives ation SUB 45 - 27 / Aquisição de Component 1: Sustainable mobiliário para escritório, Request for Single Stage - One 2020-10- 2020-11- 2020-11- 2020-11- 2020-12- 2020-12- TF / 18765 and Adaptive Community Post Limited 1,237.34 Completed incluindo mesas, cadeiras, Quotations Envelope 28 25 13 26 13 15 Initiatives armários. SUB 116 - 38 / Aquisição Component 1: Sustainable Under de material para construção Request for Single Stage - One 2020-10- 2020-11- 2020-11- 2020-12- TF / 18765 and Adaptive Community Post Limited 7,711.33 Implement do galpão de Quotations Envelope 28 24 13 13 Initiatives ation beneficiamento do azeite COVID 19 - RS68 PACARY / Aquisição de material de higiene e limpeza: xampu, condicionador, desodorante, Component 1: Sustainable Pending sabonetes, óleo de Request for Single Stage - One 2020-10- 2020-11- 2020-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement macauba, absorventes de Quotations Envelope 28 05 05 Initiatives ation pano, sabão em barra, desifentante, bucha vegetal, álcool líquido, álcool em gel, máscaras, sacola de pano e material para xarope COVID 19 - RS11 MIQCB / Aquisição de itens de higiene e proteção individual: água sanitária, Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- detergente líquido, sabão TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 05 05 em barra, alcool em gel para Initiatives ation mãos, máscaras de tecido, creme dental, embalagens plásticas para alcool em gel. COVID 19 - RS61 GORUTUBA / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- itens de higiene e proteção TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 05 05 individual: máscaras, água Initiatives ation sanitária, sabão neutro e álcool em gel. COVID 19 - RS47 ENAWENE / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- individual: sabão em barra, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 05 05 álcool em gel para mãos, Initiatives ation máscaras de tecido, sabonete em barra e vitamina C efervescente COVID 19 - RS2 NAX / Aquisição de ferramentas Component 1: Sustainable Pending para roça: machado, foice, Request for Single Stage - One 2020-10- 2020-11- 2020-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement enxada, rastelo de ferro, Quotations Envelope 28 06 06 Initiatives ation facão, lima, carrinho de mão, agulha para saco, fitilho de plástico. COVID 19 - RS35 HANAITI / Aquisição de itens de informática e equipamentos para estruturar a Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- associação: notebbok, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 08 08 transmissor de radio, mesa Initiatives ation digital, microfones, mesa, cadeira, antena de rádio, kit som, alcool em gel para mãos SUB 123 - 16 / Aquisição Component 1: Sustainable de materiais para produção Request for Single Stage - One 2020-11- 2020-11- 2020-12- 2020-12- 2021-01- 2020-12- TF / 18765 and Adaptive Community Post Limited 1,302.52 Completed de artesanato - Quotations Envelope 22 25 12 04 01 22 Initiatives miçangas III COVID 19 - RS48 ISA / Aquisição de carrinho de Component 1: Sustainable Pending mão, facão, peneira fina, Request for Single Stage - One 2020-11- 2020-12- 2020-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement bacia, caldeirão, faca Quotations Envelope 21 07 27 Initiatives ation peixeira, máscara de tecido, álcool em gel e álcool 70 SUB 123 17 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-11- 2020-11- 2020-12- 2020-11- 2021-02- combustível e oleo para as TF / 18765 and Adaptive Community Post Limited 2,013.95 Signed Quotations Envelope 22 18 06 24 04 atividades do projeto Initiatives COVID 19 - RS26 AMANU / Aquisição de seladora e Component 1: Sustainable Pending Request for Single Stage - One 2020-11- 2020-12- 2020-12- embalagens, à vácuo, para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 11 12 apoio em decorrência da Initiatives ation COVID SUB 98 - 21 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2020-11- 2021-01- 2020-12- 2021-01- 2021-01- sombrite, perfurador de TF / 18765 and Adaptive Community Post Limited 1,342.09 Signed Quotations Envelope 22 18 14 26 13 solo e roçadeira Initiatives Component 1: Sustainable SUB 110-38 / Aquisição de Request for Single Stage - One 2020-11- 2020-12- 2020-12- 2020-12- 2021-01- 2020-12- TF / 18765 and Adaptive Community Post Limited 2,007.03 Completed triturador Quotations Envelope 23 03 13 08 12 16 Initiatives COVID 19 - RS70 APOINME / Ferramentas para plantio, abastecimento de água: moto serra, sabre, corrente, Component 1: Sustainable Pending caixa d'água, calha, suporte Request for Single Stage - One 2020-11- 2020-12- 2021-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de calha, tela Quotations Envelope 26 05 04 Initiatives ation sombreamento, tela galinheiro, válvula, mangueira, enxada, foice, cavadeira, rastelo, regador, tubo e adesivo PVC, serrote, alicate. SUB 224 - SC 004 / Component 1: Sustainable Pending Request for Single Stage - One 2020-11- 2020-12- 2021-01- Aquisição de gêneros TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 12 11 alimentícios para atividades Initiatives ation do projeto COVID 19 - RS14 SÃO MODESTO / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-11- 2020-12- 2021-01- individual: álcool em gel, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 07 06 álcool líquido, sabão em Initiatives ation barra, detergente, sabão em pó e máscara de tecido. SUB 109 - 16 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-12- 2020-12- 2021-01- de telhas tipo sanduíche TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 16 29 28 para reforma do entreposto Initiatives ation SUB 129 - 18 / Aquisição Component 1: Sustainable Pending Request for Single Stage - One 2020-12- 2020-12- 2021-01- de miçangas para produção TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 27 16 de artesanato Initiatives ation COVID 19 - RS59 RAIS / Aquisição de filtros de Component 1: Sustainable Pending Request for Single Stage - One 2020-12- 2020-12- 2021-01- barros, álcool em gel, água TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 13 21 20 sanitária, sabão em barra, Initiatives ation sabonete em barra e borrifadores COVID 19 - RS22 SUMARÉ PERUAÇÚ / Aquisição de itens de higiene e proteção Component 1: Sustainable Pending Request for Single Stage - One 2020-12- 2020-12- 2021-01- individual: álcool em gel, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 13 21 20 água sanitária, sabonete Initiatives ation líquido para as mãos, luva descartável e máscara descartável COVID 19 - RS43 REDE CERRADO / Aquisição de Component 1: Sustainable Pending equipamentos de Request for Single Stage - One 2020-12- 2020-12- 2021-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement informática: notebook, Quotations Envelope 13 24 23 Initiatives ation celular, impressora, antena de internet, hd externo. SUB 125 - 18 / Aquisição Component 1: Sustainable Request for Single Stage - One 2020-12- 2021-03- 2021-01- 2021-03- 2021-01- de materiais de materiais de TF / 18765 and Adaptive Community Post Limited 1,239.59 Signed Quotations Envelope 24 09 03 31 13 escritório Initiatives Component 1: Sustainable Pending SUB 181 - 4 / Aquisição de Request for Single Stage - One 2020-12- 2021-01- 2021-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement mudas para plantio Quotations Envelope 24 06 05 Initiatives ation SUB 211 - 11 / Aquisição de eletrodomésticos para Component 1: Sustainable Pending estruturação da cozinha Request for Single Stage - One 2020-12- 2021-01- 2021-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement comunitária: geladeira, Quotations Envelope 25 05 04 Initiatives ation freezers, micro-ondas e máquina de lavar SUB 181 - 5 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2021-01- 2021-01- 2021-02- kit de ferramentas para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 06 19 18 plantio Initiatives ation SUB 25 - 19 / Aquisição de Component 1: Sustainable Request for Single Stage - One 2021-01- 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- portas e janelas para galpão TF / 18765 and Adaptive Community Post Limited 567.91 Completed Quotations Envelope 16 15 27 03 26 10 comunitário Initiatives COVID 19 - RS52 NROZAWI / Aquisição de itens de higiene e proteção: creme Component 1: Sustainable Pending Request for Single Stage - One 2021-01- 2021-02- 2021-03- dental, escova de dente, TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 04 06 sabão em barra, água Initiatives ation sanitária, máscaras, luvas, termômetros, sabonete, sabão líquido. BR-CAA-215507-GO-RFQ Component 3: Project Pending / Aquisição de climatizador Request for Single Stage - One 2021-01- 2021-02- 2021-03- TF / 18765 Management, Monitoring Post Limited 0.00 Implement para utilização no escritório Quotations Envelope 29 11 13 and Evaluation ation da agência executora SUB 25-1 / CQ25.1 Component 1: Sustainable Aquisição de mudas plantas Request for Single Stage - One 2018-04- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled apropriadas para Quotations Envelope 06 09 08 Initiatives recuperação de áreas degradadas SUB 26-10 / CT26.10 Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- Aquisicao de materiais TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 02 25 19 didaticos Initiatives Component 1: Sustainable SUB 26-5 / CT26.5 Request for Single Stage - One 2017-06- 2018-05- 2017-07- 2019-03- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Aquisição de GPS Quotations Envelope 30 28 18 10 Initiatives FS_1.5 01 / Aquisição de Component 1: Sustainable Pending Request for Single Stage - One 2021-04- 2021-04- 2021-06- saca de sementes de milho TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 04 26 25 e feijão Initiatives ation Page 10 AI2 - 24 / Aquisição de material de irrigação para Component 2: Capacity Pending Request for Single Stage - One 2021-04- 2021-04- 2021-05- Aldeia Tuxá (MG): aspersor, TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 03 14 14 tubo, registro, curva, entre Strengthening ation outros. AI2 - 25 / Aquisição de Component 2: Capacity Pending Request for Single Stage - One 2021-04- 2021-04- 2021-05- arames e telas para TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 03 14 14 instalação na Aldeia Tuxá Strengthening ation (MG) FS_1.3 03 / Aquisição de câmera filmadora, câmera Component 1: Sustainable Pending Request for 2021-04- 2021-04- 2021-06- fotográfica e câmera de TF / 18765 and Adaptive Community Post 0.00 Implement Quotations 04 26 25 ação e Aquisição de kit para Initiatives ation vídeo conferência. FS_1.2 01 / Aquisição de equipamentos de informática, sendo: notebooks, computadores tipo desktop, nobreak, Component 1: Sustainable Pending Request for Single Stage - One 2021-04- 2021-05- 2021-07- mouses sem fio e kits de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 25 24 mouse e teclado sem fio; Initiatives ation equipamentos para projeção de imagens (projetor e tela); aquisição de impressoras e aquisição de smartphones. SUB 109 - 18 / Aquisição Component 1: Sustainable Pending de estrutura metálica para Request for Single Stage - One 2021-04- 2021-05- 2021-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement instalação do telhado do Quotations Envelope 29 14 13 Initiatives ation entreposto do babaçu SUB 16 - 27 / Aquisição de Component 1: Sustainable Pending bomba para retirada de Request for Single Stage - One 2021-05- 2021-05- 2021-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement água do poço artesiano Quotations Envelope 01 16 15 Initiatives ation instalado na comunidade SUB 195 - 4 / Aquisição de gêneros alimentícios para Component 1: Sustainable Pending Request for Single Stage - One 2021-05- 2021-05- 2021-06- oficina formativa, com TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 14 27 26 representantes mulheres Initiatives ation das aldeias da TI Sangradouro FS_26 1.1 / Aquisição de Component 2: Capacity Pending Request for Single Stage - One 2021-05- 2021-06- 2021-07- balanças digitais e seladoras TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 21 07 07 de pedal Strengthening ation FS_25 1.1 1 / Aquisição de forno elétrico para torrar Component 2: Capacity Pending farinha, aquisição de prensa Request for Single Stage - One 2021-05- 2021-06- 2021-09- TF / 18765 Building and Institutional Post Limited 0.00 Implement de ferro para produção de Quotations Envelope 31 18 16 Strengthening ation farinha e aquisição de ralador de mandioca FS_4 1.1 / Aquisição de Component 2: Capacity Pending ferramentas agrícolas: Request for Single Stage - One 2021-05- 2021-06- 2021-07- TF / 18765 Building and Institutional Post Limited 0.00 Implement enxadas, foices e Quotations Envelope 28 10 10 Strengthening ation plantadeiras manuais. FS_195 1.1_SUB 99 - 22 / Component 1: Sustainable Pending Request for Single Stage - One 2021-05- 2021-06- 2021-08- Aquisição de geradores à TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 31 21 20 energia a diesel Initiatives ation BR-CAA-238190-GO-RFQ / Aquisição de Component 3: Project Pending equipamentos para internet Request for Single Stage - One 2021-06- 2021-06- 2021-08- TF / 18765 Management, Monitoring Post Limited 0.00 Implement rural - apoio membro do Quotations Envelope 11 30 29 and Evaluation ation CGN: antena, cabos, conectores, torre, swicht, entre outros. BR-CAA-238191-GO-RFQ / Aquisição de Component 3: Project Pending Request for Single Stage - One 2021-06- 2021-06- 2021-08- equipamentos para internet TF / 18765 Management, Monitoring Post Limited 0.00 Implement Quotations Envelope 11 30 29 rural - apoio membro do and Evaluation ation CGN: antena, modem e roteador SUB 90 - 7 / Aquisição de Component 1: Sustainable Pending impressora para impressão Request for Single Stage - One 2021-06- 2021-06- 2021-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de lotes e validade, para Quotations Envelope 15 27 30 Initiatives ation rotulagem de produtos SUB 98 - 22 / Aquisição de Component 1: Sustainable Pending material de construção Request for Single Stage - One 2021-06- 2021-07- 2021-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement complementar para Quotations Envelope 20 12 11 Initiatives ation construção do galpão SUB 109 - 19 / Aquisição de material de construção Component 1: Sustainable Pending para fase de acabamento da Request for Single Stage - One 2021-06- 2021-06- 2021-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção do galpão do Quotations Envelope 16 29 29 Initiatives ation entreposto de babaçu - materiais elétricos SUB 268 - 11 / Aquisição Component 1: Sustainable Pending de uma betoneira para Request for Single Stage - One 2021-06- 2021-07- 2021-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement auxiliar nas obras do Quotations Envelope 18 01 31 Initiatives ation galpão, na comunidade SUB 109 - 20 / Aquisição de materiais hidráulicos e Component 1: Sustainable Pending materiais de construção Request for Single Stage - One 2021-06- 2021-07- 2021-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement (para reservatório) para fase Quotations Envelope 20 16 15 Initiatives ation final de construção de entreposto de babaçu. NON CONSULTING SERVICES Activity Reference No. Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual BR-CAA-3291-NC-RFB / contratacao de empresa especializada em servicos de agenciamento de viagens Component 1: Sustainable Single Stage - One 2015-06- 2015-07- 2015-07- 2019-09- 2015-09- 2015-09- 2015-10- 2015-11- 2015-12- 2015-11- 2016-12- e fornecimento de TF / 18765 and Adaptive Community Post Request for Bids Open - National 291,879.28 Signed Envelope 24 08 09 20 01 01 28 09 16 24 16 passagens aereas regionais Initiatives nacionais e internacionais e passagens terrestres para realizacao das atividades BR-CAA-3309-NC-RFQ / contratacao de servico de nao consultoria durante primeiro edital para Component 2: Capacity producao de videos com Request for Single Stage - One 2016-12- 2016-12- 2017-01- 2017-01- 2018-04- TF / 18765 Building and Institutional Post Limited 14,630.04 Signed captacao de imagens e Quotations Envelope 21 22 18 25 13 Strengthening decupagem e roteiro e edicao e tratamento de imagem e finalizacao de quatro videos curtos e um video institucional BR-CAA-3319-NC-RFQ / contratacao de empresa especializada em servicos Component 3: Project Pending de auditoria externa para Request for Single Stage - One 2017-01- 2017-02- 2018-02- TF / 18765 Management, Monitoring Post Limited 0.00 Implement auditar os documentos Quotations Envelope 04 02 08 and Evaluation ation projeto referente ao exercicio dois mil e quinze e dois mil e dezesseis BR-CAA-3257-NC-RFQ / contratacao de servico de nao consultoria para de impressao cartilhas Component 2: Capacity Pending Request for Single Stage - One 2017-02- 2017-03- 2019-03- tematicas para apresentacao TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 19 31 27 do projeto e publicacao da Strengthening ation avaliacao dos resultados por edicao dos relatorios finais do primeiro edital BR-CAA-3289-NC-RFQ / contratacao de servico para producao de pecas graficas de cartilha com construcao Component 2: Capacity Pending de layout e definicao de Request for Single Stage - One 2017-02- 2017-03- 2017-06- TF / 18765 Building and Institutional Post Limited 0.00 Implement fonte e espacamento e Quotations Envelope 12 20 18 Strengthening ation marca de texto e elemento grafico e diretrizes de diagramacao do material que sera diagramado pela equipe BR-CAA-4658-NC-RFQ / contratacao de empresa para prestacao de servico Component 3: Project nao continuados para Request for Single Stage - One 2015-12- 2015-12- 2015-12- 2015-12- 2016-02- 2016-02- TF / 18765 Management, Monitoring Post Limited 787.27 Completed realizacao de um evento de Quotations Envelope 02 01 23 23 21 20 and Evaluation reuniao anual do comite gestor nacional com locacao de sala e servico de coffee break BR-CAA-4671-NC-RFQ / contratacao de empresa para prestacao de servico de transporte para o primeiro Component 2: Capacity Under Request for Single Stage - One 2016-01- 2016-01- 2016-01- 2016-03- intercambio nacional TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 06 06 14 14 membros do comite gestor Strengthening ation nacional a ser ralizado em sao joao das missoes em minas gerais BR-CAA-4665-NC-RFQ / contratacao de empresa para prestacao de servicos para oficina de divugacao Component 1: Sustainable Pending de editais e treinamento Request for Single Stage - One 2016-01- 2016-02- 2016-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para qualificacao propostas Quotations Envelope 19 02 02 Initiatives ation com fornecimento de coffee break e refeicoes e locacao de espaco e hospedagem realizacao em brasilia BR-CAA-4659-NC-RFQ / contratacao de empresa para prestacao de servicos para oficina de divugacao Component 1: Sustainable Pending de editais e treinamento Request for Single Stage - One 2015-12- 2016-02- 2016-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para qualificacao propostas Quotations Envelope 28 11 11 Initiatives ation com fornecimento de coffee break e refeicoes e locacao de espaco e hospedagem realizacao em imperatriz BR-CAA-4661-NC-RFQ / contratacao de empresa para prestacao de servicos para oficina de divugacao Component 1: Sustainable Under de editais e treinamento Request for Single Stage - One 2016-01- 2017-02- 2016-02- 2016-04- TF / 18765 and Adaptive Community Post Limited 31,807.01 Implement para qualificacao propostas Quotations Envelope 13 02 04 04 Initiatives ation com fornecimento de coffee break e refeicoes e locacao de espaco e hospedagem realizacao em cuiaba BR-CAA-4673-NC-RFQ / contratacao de servicos graficos para material pedagogico tipo impressao Component 1: Sustainable Pending Request for Single Stage - One 2016-01- 2016-03- 2016-05- de cracha de bloco e pasta TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 26 22 21 de papel realizacao de tres Initiatives ation oficinas de divulgacao e duas de elaboracao projeto e tres seminarios BR-CAA-4668-NC-RFQ / Component 2: Capacity contratacao de servico de Request for Single Stage - One 2016-04- 2016-04- 2016-04- 2016-04- 2016-06- 2016-06- TF / 18765 Building and Institutional Post Limited 307.10 Completed impressao de folder para Quotations Envelope 20 20 25 25 24 25 Strengthening apresentacao do projeto BR-CAA-4660-NC-RFQ / contratacao de empresa para prestacao de servicos de coffee break para Component 3: Project Pending realizacao de reunioes do Request for Single Stage - One 2016-06- 2016-06- 2017-01- TF / 18765 Management, Monitoring Post Limited 0.00 Implement comite gestor nacional Quotations Envelope 03 12 29 and Evaluation ation sendo a segunda reuniao extraordinaria e a terceira reuniao ordinaria do ano de dois mil e dezesseis a ser realizado em brasilia BR-CAA-4672-NC-RFQ / contratacao de empresa para prestacao de servicos com fornecimento de coffee Component 2: Capacity Request for Single Stage - One 2016-06- 2016-06- 2016-07- 2016-07- 2016-08- 2016-08- break e refeicao e locacao TF / 18765 Building and Institutional Post Limited 8,014.75 Completed Quotations Envelope 25 27 11 11 10 09 de espaco e hospedagem e Strengthening sistema de projecao de som e flip chart para seminario nacional de fortalecimento institucional BR-CAA-4667-NC-RFQ / contratacao de empresa para a prestacao de servicos com fornecimento de coffee Component 3: Project Pending break refeicao e locacao de Request for Single Stage - One 2015-11- 2015-12- 2016-02- TF / 18765 Management, Monitoring Post Limited 0.00 Implement espaco com hospedagem e Quotations Envelope 17 23 21 and Evaluation ation sistema de projecao de som e flip chart para oficina de elaboracao de projeto a ser realizado em montes claros BR-CAA-4670-NC-RFQ / contratacao de empresa para a prestacao de servicos com fornecimento de coffee Component 1: Sustainable Pending break refeicao e locacao de Request for Single Stage - One 2016-11- 2016-12- 2017-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement espaco com hospedagem e Quotations Envelope 22 28 07 Initiatives ation sistema de projecao de som e flip chart para oficina de elaboracao de projeto a ser realizado em cuiaba BR-CAA-3259-NC-RFQ / contratacao de empresa para a prestacao de servicos com fornecimento de coffee Component 2: Capacity Pending Request for Single Stage - One 2017-07- 2017-08- 2017-10- break refeicao e locacao de TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 29 18 17 espaco com hospedagem e Strengthening ation sistema de projecao de som e flip chart para Primeiro Seminário - tema de Redd. Local: Brasilia BR-CAA-17761-NC-RFQ / Contratação de empresa para a prestação de serviços técnicos, não continuados, Component 2: Capacity Pending Request for Single Stage - One 2017-07- 2017-08- 2017-10- para Oficina Interna REDD+. TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 15 04 03 Fornecimento de: Coffe Strengthening ation break, Refeição (almoço/jantar), locação espaço e hospedagem, sala. BR-CAA-3263-NC-RFQ / Contratacao de empresa Component 2: Capacity Pending para prestacao de servico de Request for Single Stage - One 2017-09- 2017-09- 2017-11- TF / 18765 Building and Institutional Post Limited 0.00 Implement transporte nao continuados Quotations Envelope 04 24 23 Strengthening ation para segundo intercambio nacional. Tema sobre Redd. BR-CAA-3269-NC-RFQ / Contratacao de empresa para a prestacao de servicos com fornecimento de coffee break refeicao e locacao de Component 2: Capacity Pending Request for Single Stage - One 2017-07- 2017-09- 2017-11- espaco com hospedagem e TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 28 11 10 sistema de projecao de som Strengthening ation e flip chart para segundo seminario temático. Tema: Atuando com Povos e Comunidades Tradicionais BR-CAA-3213-NC-RFQ / Contratacao de empresa para prestacao de servico de Component 2: Capacity Pending Request for Single Stage - One 2017-09- 2017-11- 2018-01- transporte nao continuados TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 22 06 05 para terceiro intercambio Strengthening ation nacional local evento a ser definido. Tema RAI. BR-CAA-3260-NC-RFQ / Contratacao de empresa para a prestacao de servicos com fornecimento de coffee break refeicao e locacao de Component 2: Capacity Pending Request for Single Stage - One 2018-03- 2018-05- 2018-06- espaco com hospedagem e TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 17 01 30 sistema de projecao de som Strengthening ation e flip chart para terceiro seminario temático. Tema: Políticas Públicas, Programas e ações govern BR-CAA-17790-NC-RFQ / Serviço de Instalação de Ar Component 3: Project Pending Condicionado Piso/Teto Request for Single Stage - One 2017-09- 2017-10- 2017-11- TF / 18765 Management, Monitoring Post Limited 0.00 Implement Split, potência 36.000btus - Quotations Envelope 11 01 30 and Evaluation ation para estruturação da sala reuniões DGM BR-CAA-17792-NC-RFQ / Prestação de serviço para readequação, suporte, no sistema informatizado Component 3: Project SIG/CAA, de mecanismos 2017-06- 2017-10- 2017-07- 2017-10- 2019-12- TF / 18765 Management, Monitoring Post Direct Selection Direct 18,540.50 Signed deimplementações para 19 10 10 10 27 and Evaluation gestão e monitoramento financeiro e de progresso de execução do projeto DGM/FIP/Brasil. Component 1: Sustainable Pending SUB 4-1 / CT4.1 Serviços 2017-07- 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais de mateiro 20 25 04 03 Initiatives ation Page 11 SUB 4-9 / CT4.9. Serviços Component 1: Sustainable Pending Request for Single Stage - One 2018-02- 2018-03- 2018-05- de confecção de folder TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 06 16 05 camisetas e bonés. Initiatives ation SUB 4-10 / CT4.10. Contratação de assessoria Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-01- 2017-08- 2018-03- 2018-11- técnica para acompanhar e TF / 18765 and Adaptive Community Post Limited 12,344.98 Signed Quotations Envelope 24 25 02 22 25 subsidiar a execução das Initiatives atividades do projeto. SUB 16-11 / CQ16-11 Serviço gerais de jovens Component 1: Sustainable Pending comunitários para Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement realização do diagnostico Quotations Envelope 30 24 23 Initiatives ation socioambiental participativo com trinta e seis famílias SUB 25-2 / CQ25.2 Component 1: Sustainable Pending Aquisição de diversos 2017-06- 2017-07- 2017-07- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement lanches e refeiçoes com a 19 06 28 20 Initiatives ation comunidade para cercamento de nascentes SUB 25-3 / CQ25.3 Contratação de profissional Component 1: Sustainable Pending para moderar e instruir Request for Single Stage - One 2018-03- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement sobre plantio manejo Quotations Envelope 25 11 10 Initiatives ation monitoramento e cuidados com as mudas SUB 25-5 / CQ25.5 Serviços gráficos de diagramação ou produção Component 1: Sustainable Pending de arte e produção de cento Request for Single Stage - One 2017-07- 2017-07- 2018-03- TF / 18765 and Adaptive Community Post Limited 0.00 Implement e cinquenta cartilhas para Quotations Envelope 06 28 25 Initiatives ation divulgação e reprodução de vinte e cinco apostilas para formação sobre o plantio e manejo de mudas SUB 25-10 / CQ25.10 Component 1: Sustainable Pending Contratação de serviços de 2018-01- 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement mão de obra para 05 22 13 25 Initiatives ation construção de cerca SUB 25-12 / CQ25.12 Component 1: Sustainable Pending Contratação de serviço de Request for Single Stage - One 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Limited 0.00 Implement frete para transporte de Quotations Envelope 24 21 23 Initiatives ation produtos e insumo SUB 25-14 / CQ25.13 Component 1: Sustainable Pending Contratação de serviço de Request for Single Stage - One 2018-07- 2018-08- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement aluguel de veiculo para o Quotations Envelope 01 02 28 Initiatives ation transporte de pessoas SUB 25-13 / CQ25.14 Contratação de profissional para formar as famílias Component 1: Sustainable Pending 2017-06- 2017-07- 2017-07- 2017-09- envolvidas quanto a TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 20 07 28 12 questões ligadas a Initiatives ation preservação e proteção das nascentes envolvendo gênero e geração SUB 25-15 / CQ25.15 Contratação de profissional com formação politica quanto a gênero e etinia por Component 1: Sustainable Pending diária para instruir na 2017-08- 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement oficina de treinamento de 16 01 22 06 Initiatives ation apoio a formação das famílias quanto as questões de preservação e protecao das nascentes envolvendo genero SUB 25-16 / CQ25.16 Contratação de profissional com formação na área de Component 1: Sustainable Pending meio ambiente por diária 2017-10- 2017-11- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement para atuar em uma oficina 20 07 29 28 Initiatives ation de formação das famílias sobre questões de catalogação de nascentes envolvendo gênero e geração SUB 26-4 / CT26.4 Contratação de servicos Component 1: Sustainable Request for Single Stage - One 2017-08- 2018-09- 2017-08- 2018-09- 2017-09- 2018-09- gráficos para confecção de TF / 18765 and Adaptive Community Post Limited 155.19 Completed Quotations Envelope 02 04 21 06 30 15 camisetas banners e Initiatives impressão de caderno SUB 26-7 / CT26.7 Contratacao de servicos de logistica de evento no municipio de Caceres em Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-08- 2017-07- 2018-09- 2017-09- 2018-10- defesa e protecao ao bioma TF / 18765 and Adaptive Community Post Limited 229.11 Completed Quotations Envelope 03 22 21 03 19 03 cerrado como forma de Initiatives sensibilizacao e tambem para a amostra de produtos sustentaveis SUB 26-12 / CT26.12 Component 1: Sustainable Pending Contratacao profissionais Request for Single Stage - One 2017-07- 2017-08- 2019-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para servicos de articulacao Quotations Envelope 15 08 30 Initiatives ation por diaria SUB 45-8 / CT45.8 Contratacao de servico de Component 1: Sustainable Pending Request for Single Stage - One 2017-06- 2017-07- 2017-08- moderacao e instrutoria TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 21 30 para oficina de gestao Initiatives ation organizacional SUB 45-10 / CT45.10 Contratacao de servico de Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-02- moderacao e instrutoria TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 16 25 para curso de seguranca do Initiatives ation trabalho SUB 45-11 / CT45.11 Component 1: Sustainable Pending Contratacao de servico de Request for Single Stage - One 2017-11- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement moderacao e instrutoria Quotations Envelope 18 15 29 Initiatives ation para curso sobre a saude da mulher SUB 45-19 / CT45.19 Component 1: Sustainable Aquisicao de kit de material Request for Single Stage - One 2017-06- 2017-11- 2017-07- 2017-11- 2017-08- 2017-12- TF / 18765 and Adaptive Community Post Limited 394.95 Completed didatico para cursos oficinas Quotations Envelope 28 06 17 09 16 08 Initiatives e intercambios SUB 45-21 / CT45.21 Contratacao de servicos Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-05- 2017-08- 2018-07- 2017-09- 2018-09- graficos para impressao de TF / 18765 and Adaptive Community Post Limited 782.73 Completed Quotations Envelope 10 21 03 27 12 04 folder banners e confeccao Initiatives de camisetas SUB 45-22 / CT45.22 Component 1: Sustainable Pending Locacao de veiculo micro Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement onibus com capacidade para Quotations Envelope 29 21 30 Initiatives ation 20 passageiros SUB 55-6 / CT55.6 Component 1: Sustainable Pending Aquisicao e instalacao de Request for Single Stage - One 2017-06- 2017-07- 2017-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement uma Cisterna para captacao Quotations Envelope 25 18 27 Initiatives ation de agua de chuva SUB 55-9 / CT55.9 Locacao Component 1: Sustainable de veiculos para Request for Single Stage - One 2017-07- 2017-09- 2017-07- 2017-10- 2018-05- TF / 18765 and Adaptive Community Post Limited 2,185.39 Signed atendimento de diversas Quotations Envelope 01 27 18 17 14 Initiatives finalidades de execucao do Subprojeto SUB 55-13 / CT55.13 Contratacao de profissional Component 1: Sustainable para assessoria tecnica Request for Single Stage - One 2017-07- 2018-01- 2017-07- 2018-03- 2018-05- 2019-03- TF / 18765 and Adaptive Community Post Limited 11,568.52 Completed para acompanhar e Quotations Envelope 02 25 27 20 23 20 Initiatives subsidiar a execucao das atividades do projeto SUB 55-17 / CT55.17 Contratacao de profissional especializado com Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-09- 2017-10- experiencia em TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 21 31 agroindustria familiar e Initiatives ation comunitaria para ministrar Oficina de Capacitacao em Compostagem SUB 55-18 / CT55.18 Contratacao de profissional Component 1: Sustainable Pending especializado para ministrar Request for Single Stage - One 2017-08- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Oficina de Capacitacao em Quotations Envelope 31 22 11 Initiatives ation Uso e Aproveitamento de Cagaita SUB 55-19 / CT55.19 Contratacao de profissional Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-02- especializado para ministrar TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 15 24 oficina de capacitacao em Initiatives ation uso e aproveitamento do Araticum SUB 56-11 / CT56.11 Servico de hora maquina de Component 1: Sustainable Request for Single Stage - One 2017-09- 2019-06- 2017-10- 2019-06- 2019-01- 2019-07- pa carregadeira para TF / 18765 and Adaptive Community Post Limited 3,341.01 Completed Quotations Envelope 21 03 16 12 09 25 construcao de bacias de Initiatives contencao de aguas pluviais SUB 56-12 / CT56.12 Component 1: Sustainable Pending Servico de horas maquina Request for Single Stage - One 2017-10- 2017-11- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de trator para retirada dos Quotations Envelope 25 20 19 Initiatives ation eucaliptos nas areas de recarga SUB 56-13 / CT56.13 Contratacao de servicos de Component 1: Sustainable Pending Request for Single Stage - One 2017-12- 2018-01- 2018-03- instrutor para ministrar TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 20 15 26 quatro oficinas para Initiatives ation implantacao de sistemas agroflorestais SUB 56-14 / CT56.14 Contratacao de servicos Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-09- 2017-10- graficos para confeccao de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 20 30 materiais de divulgacao Initiatives ation boletins SUB 61-16 / CQ61.16 Component 1: Sustainable Pending Contratação de profissional Request for Single Stage - One 2017-07- 2017-07- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para realizar assessoria Quotations Envelope 06 26 22 Initiatives ation técnica ao subprojeto SUB 61-18 / CQ61.18 Contratação de profissional técnico para realizar Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-09- 2018-04- capacitação de valoração da TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 30 18 produção artesanal Initiatives ation quilombola existente na comunidade SUB 71-4 / CT71.4 Component 1: Sustainable Request for Single Stage - One 2017-07- 2018-06- 2017-07- 2018-08- 2019-03- Contratação de agentes TF / 18765 and Adaptive Community Post Limited 5,274.07 Signed Quotations Envelope 04 20 24 29 16 locais comunitários Initiatives SUB 71-6 / CT71.6 Contratação de assessoria Component 1: Sustainable Under Request for Single Stage - One 2017-07- 2018-02- 2017-07- 2019-04- técnica para acompanhar e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 08 28 19 subsidiar a execução das Initiatives ation atividades do subprojeto SUB 75-2 / CQ75.2 Contratação de servicos de Component 1: Sustainable Pending comunicação e imprensa Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement para acompanhamento a Quotations Envelope 06 31 04 Initiatives ation eventos criação e suporte da pagina de facebook SUB 90-2 / CT90.2 Contratação de servicos de identidade visual para desenvolver e aprimorar Component 1: Sustainable embalagens com identidade Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled visual coerente as Quotations Envelope 08 31 09 Initiatives comunidades e com linguagem visual que torne os produtos ecossociais mais interessantes no mercado SUB 90-3 / CT90.3 Contratação de servicos Component 1: Sustainable gráficos de confecção de Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled rótulos diversos com Quotations Envelope 09 31 09 Initiatives identidade e linguagem visual das comunidades SUB 90-4 / CT90.4 Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-10- Contratação de servicos TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 02 01 para realização de quinze Initiatives fretes SUB 99-13 / CT99.13 Component 1: Sustainable Pending Contratacao de servicos Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement graficos para impressao de Quotations Envelope 12 04 03 Initiatives ation folder e banners SUB 99-14 / CT99.14 Fornecimento de alimentação para Oficina Component 1: Sustainable Pending sobre agroecologia 2017-07- 2017-07- 2017-08- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement Funcionamento do PAIS 06 16 03 30 Initiatives ation Intercambio Oficina de agroecologia Oficinas sobre o manejo do sistema PAIS SUB 99-15 / CT99.15 Contratação de profissional Component 1: Sustainable Pending para assessoria técnica no Request for Single Stage - One 2017-07- 2017-08- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement processo de produção Quotations Envelope 13 03 24 Initiatives ation agrícola e manejo da unidade produtiva SUB 105-1 / CQ105.1 Contratação de serviços de técnicos para elaboração e Component 1: Sustainable Pending Request for Single Stage - One 2018-09- 2018-10- 2018-11- socialização do caderno de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 16 30 planos de gestão e praticas Initiatives ation de produção tradicionais quilombolas SUB 105-3 / CQ105.3 Contratação de serviço de Component 1: Sustainable locação de veículos para os 2017-07- 2019-06- 2017-07- 2019-06- 2017-08- 2019-07- 2018-03- 2019-07- TF / 18765 and Adaptive Community Post Direct Selection Direct 1,933.97 Completed eventos de Encontro da 10 25 20 27 02 09 30 29 Initiatives juventude e Caravana quilombola do jalapão SUB 105-5 / CQ105.5 Component 1: Sustainable Pending Contratação de serviços de Request for Single Stage - One 2017-07- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement diagnostico e elaboração do Quotations Envelope 17 08 07 Initiatives ation plano de gestão territorial SUB 105-11 / CQ105.11 Contratação de serviços gerais de Cozinheira em Component 1: Sustainable Pending diversas comunidades por 2017-07- 2017-07- 2017-07- 2018-07- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement diária para Oficinas 11 16 27 22 Initiatives ation Elaboração do plano de gestão territorial Encontro da juventude e Caravana quilombola do jalapão SUB 109-1 / CT109.1 Contratação de serviços Component 1: Sustainable Pending Request for Single Stage - One 2017-07- 2017-08- 2017-12- gerais de pedreiro para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 27 14 12 reforma do entreposto dos Initiatives ation produtos do babaçu SUB 110-23 / CQ110.23 Contratação de serviços gerais, por diária, de Component 1: Sustainable 2017-07- 2017-08- 2017-08- 2017-09- tratorista para fazer a TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 28 07 21 30 marcação das curvas de Initiatives nível e terraceamento na área com erosão SUB 110-25 / CQ110.25 Component 1: Sustainable Contratação de serviços de Request for Single Stage - One 2018-01- 2018-02- 2018-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled locação de veículos ônibus Quotations Envelope 23 19 16 Initiatives para intercâmbios SUB 116-16 / CT116.16 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-09- 2017-10- Serviço de confecção de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 14 04 09 camisetas de divulgação Initiatives ation SUB 116-22 / CT116.22 Component 1: Sustainable Pending Contratação de serviços 2017-08- 2017-08- 2017-09- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement locação de lancha para 11 19 04 29 Initiatives ation expedição fluvial SUB 116-23 / CT116.23 Contratação de serviços Component 1: Sustainable Pending 2017-08- 2017-08- 2017-08- 2017-09- gerais de pedreiro, por TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 01 08 21 25 diária, para construção do Initiatives ation reservatório de água SUB 116-24 / CT116.24 Component 1: Sustainable Pending Request for Single Stage - One 2017-08- 2017-08- 2017-10- Contratação de serviços TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 08 28 02 para instalação elétrica e Initiatives ation hidráulico SUB 130-6 / CT130.6 Contratação de serviços Component 1: Sustainable Request for Single Stage - One 2017-08- 2019-01- 2017-08- 2018-01- 2017-09- 2018-02- gráficos para impressão de TF / 18765 and Adaptive Community Post Limited 558.86 Completed Quotations Envelope 01 16 21 29 30 28 capa do catálogo dos Initiatives produtos Jatobá Pequi e Baru Page 12 SUB 130-8 / CT130.8 Contratação de serviços Component 1: Sustainable para analise final Request for Single Stage - One 2017-08- 2019-06- 2017-08- 2019-06- 2017-10- 2019-08- TF / 18765 and Adaptive Community Post Limited 2,990.65 Completed microbiológica e Quotations Envelope 04 10 25 19 04 15 Initiatives bromatológica do beneficiamento do Jatobá Pequi e Baru Component 1: Sustainable SUB 3-16 / Contratação de 2017-07- 2017-08- 2017-08- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled serviços de cozinheiras/os 26 09 25 26 Initiatives SUB 3-18 / Contratação de Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2017-11- serviço para construção de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 26 31 01 um barracão rústico Initiatives SUB 74-4 / Contratação de Component 1: Sustainable Request for Single Stage - One 2017-08- 2019-10- 2017-08- 2019-10- 2018-01- 2019-10- empresas locação de TF / 18765 and Adaptive Community Post Limited 750.60 Completed Quotations Envelope 02 15 16 17 03 17 veículos. Initiatives Component 1: Sustainable Pending SUB 108-1 / Contratação 2018-08- 2018-08- 2018-10- 2018-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement de serviços de cozinheira. 03 24 01 03 Initiatives ation SUB 28-2 / Contratação de Component 1: Sustainable serviços de aluguel de micro- Request for Single Stage - One 2018-01- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled ônibus para transporte de Quotations Envelope 05 06 09 Initiatives passageiros Component 1: Sustainable SUB 28-3 / Contratação de 2018-01- 2018-02- 2018-03- 2018-04- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled serviços de cozinheiras. 15 06 09 16 Initiatives SUB 113-5 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2017-10- 2017-11- 2018-12- de serviço para produção de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 06 07 14 materiais de divulgação. Initiatives ation BR-CAA-23125-NC-RFQ / Contratação de empresa para prestação de serviço, Component 3: Project Request for Single Stage - One 2017-08- 2016-12- 2017-08- 2016-12- 2018-02- 2017-02- não continuados, para TF / 18765 Management, Monitoring Post Limited 21,956.12 Completed Quotations Envelope 03 01 09 20 05 17 realização de 04 (quatro) and Evaluation eventos - reuniões do comitê gestor nacional SUB 113-8 / Serviços de Component 1: Sustainable Pending digramação de impressão Request for Single Stage - One 2017-10- 2017-11- 2018-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de materiais de divulgação Quotations Envelope 02 03 10 Initiatives ation da cultura indígena Chiquitana SUB 120-4 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2019-05- de serviço de locação TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 14 02 24 veículo Initiatives ation Component 1: Sustainable Pending SUB 120-6 / Contratação Request for Single Stage - One 2017-09- 2017-10- 2019-05- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de serviços de contabilidade Quotations Envelope 14 02 24 Initiatives ation Component 1: Sustainable Pending SUB 120-7 / Contratação Request for Single Stage - One 2017-11- 2017-11- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de serviços de transporte Quotations Envelope 09 27 16 Initiatives ation SUB 135-4 / Contratação de profissional em áudio Component 1: Sustainable Pending Request for Single Stage - One 2017-10- 2017-10- 2017-12- visual, para registro das TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 26 25 etapas do projeto e Initiatives ation capacitação de jovens cineastas Component 1: Sustainable Pending SUB 135-5 / Contratação Request for Single Stage - One 2017-09- 2017-10- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de serviços de tratorista Quotations Envelope 18 02 23 Initiatives ation SUB 42-1 / Serviços de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2017-12- capturas de imagens para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 11 11 construção de um vídeo Initiatives ation SUB 42-2 / Serviço de Component 1: Sustainable Pending Request for Single Stage - One 2018-09- 2018-09- 2018-11- confecção de Banner de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 11 28 28 90cmX1,20m Initiatives ation SUB 42-3 / Serviço de Component 1: Sustainable Pending confecção de Placa de Request for Single Stage - One 2017-12- 2018-02- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement identificação do projeto de Quotations Envelope 19 05 04 Initiatives ation vigilância irom cati. SUB 42-4 / Serviço de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2018-02- fornecimento de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 16 14 combustíveis e lubrificantes Initiatives ation SUB 120-3 / Contratação Component 1: Sustainable Pending de serviços de locação de Request for Single Stage - One 2017-09- 2017-10- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement caminhonete comunitária Quotations Envelope 25 11 23 Initiatives ation para transporte de combustível SUB 113-2 / Contratação de agente de animação na comunidade, para realizar: 1-organização para Component 1: Sustainable construção dos apiários - 2- Request for Single Stage - One 2017-09- 2017-10- 2018-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled organização e Quotations Envelope 15 02 06 Initiatives acompanhamento da instalação e funcionamento dos viveiros e monitoramento do processo de produção de mudas SUB 30 - 2 / Serviço de Component 1: Sustainable Pending Request for Single Stage - One 2017-09- 2017-10- 2018-11- fornecimento de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 10 15 combustível para o projeto. Initiatives ation Component 1: Sustainable SUB 26-2 / CT26.2 Request for Single Stage - One 2017-06- 2018-09- 2017-07- 2018-11- 2018-02- TF / 18765 and Adaptive Community Post Limited 2,842.63 Signed Locações de veículos. Quotations Envelope 30 19 17 06 12 Initiatives SUB 135-1 / Contratação Component 1: Sustainable Pending de serviços de cozinheira 2017-09- 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement que será realizado por 11 21 04 04 Initiatives ation pessoa local. SUB 135-2 / Contratação Component 1: Sustainable Pending de indígena especializado 2017-09- 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement em madeiramento nativo - 11 21 04 04 Initiatives ation indígena 1 SUB 135-3 / Contratação Component 1: Sustainable Pending de marceneiro para 2017-09- 2017-09- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement construção de estrutura 11 23 06 06 Initiatives ation para armazenamento de sementes SUB 135-23 / Contratação Component 1: Sustainable Pending 2017-09- 2017-09- 2017-10- 2017-12- de 01 indígena TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 11 20 03 04 especializados em Initiatives ation madeiramento nativo SUB 28-13 / Serviços de Component 1: Sustainable fornecimento de lanche para 2017-09- 2017-09- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled manejo e produção de 04 10 26 26 Initiatives adubo verde SUB 28-14 / Serviços de Component 1: Sustainable fornecimento de lanche para 2017-09- 2017-10- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled manejo ecológico de pragas 25 02 17 16 Initiatives e doenças de frutíferas SUB 28-15 / Serviços de Component 1: Sustainable fornecimento de lanche para 2018-03- 2018-03- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled associativismo e 23 31 16 15 Initiatives comercialização SUB 28-16 / Serviços de fornecimento de lanche para Component 1: Sustainable 2018-10- 2018-10- 2018-11- 2019-01- produção de mudas de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 15 21 06 05 frutíferas para Initiatives comercialização SUB 3-15 / Contratação de serviços de tratoristas para Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-01- plantio de mudas e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 12 04 11 30 sementes no entorno das Initiatives aldeias Aopá - Madzabdze SUB 28-9 / erviços de fornecimento de lanche para Component 1: Sustainable participantes da 2017-09- 2017-09- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled capacitações em: manejo 04 10 26 26 Initiatives ecológico de frutíferas e manejo ecológico do solo SUB 4-6 / CT4.6. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 42-7 / Contração de Component 1: Sustainable Pending agente comunitário 1 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-8 / Contração de Component 1: Sustainable Pending agente comunitário 2 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-9 / Contração de Component 1: Sustainable Pending agente comunitário 3 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-10 / Contração de Component 1: Sustainable Pending agente comunitário 4 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-11 / Contração de Component 1: Sustainable Pending agente comunitário 5 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-12 / Contração de Component 1: Sustainable Pending agente comunitário 6 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-13 / Contração de Component 1: Sustainable Pending agente comunitário 7 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-14 / Contração de Component 1: Sustainable Pending agente comunitário 8 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-15 / Contração de Component 1: Sustainable Pending agente comunitário 9 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-16 / Contração de Component 1: Sustainable Pending agente comunitário 10 para 2017-09- 2017-09- 2017-10- 2019-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement serviço para vigilância e 15 29 16 01 Initiatives ation fiscalização SUB 42-18 / Serviços de serraria para realizar Component 1: Sustainable Pending adequação de barracão para 2017-09- 2017-10- 2017-10- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement servir de sede do projeto e 23 07 24 02 Initiatives ation para acondicionar equipamentos SUB 4-11 / CT4.11. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 4-12 / CT4.12. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 4-13 / CT4.13 Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes SUB 4-14 / CT4.14. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes SUB 4-15 / CT4.15. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes SUB 4-16 / CT4.16. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes SUB 4-17 / CT4.17. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 4-18 / CT4.18. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 4-19 / CT4.19. Component 1: Sustainable Pending Contratação de serviços 2017-11- 2017-12- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement gerais para o realizar o 15 02 02 03 Initiatives ation cercamento do isolamento das nascentes. SUB 16-2 / CQ16-2 Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-01- 2017-07- 2018-03- 2017-10- Serviços de perfuração de TF / 18765 and Adaptive Community Post Limited 8,037.54 Signed Quotations Envelope 30 23 24 02 02 poço artesiano. Initiatives SUB 134-1 / Serviço de Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2019-03- mão de obra geral de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 27 04 22 17 viveirista Initiatives SUB 56-10 / CT56.10 Component 1: Sustainable 2017-06- 2017-07- 2017-07- 2017-08- Contratacao de servico de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 29 08 19 28 pedreiro por diaria Initiatives SUB 56-15 / CT56.15 Contratacao de servico de Component 1: Sustainable cozinheira por diaria para 2017-07- 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled quatro oficinas comunitaria 10 15 07 21 Initiatives de capacitacao mapeamento e planejamento participativo SUB 42-5 / Serviço de cozinheira para 01 oficina de capacitação sobre o Component 1: Sustainable 2017-09- 2017-09- 2017-10- 2017-10- trabalho de vigilância, TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 05 19 06 27 planejamento e orientação Initiatives sobre como serão formados os grupos de trabalho a cada etapa SUB 42-37 / Serviço de cozinheira 2 para 01 oficina de capacitação sobre o Component 1: Sustainable trabalho de vigilância, 2017-09- 2017-09- 2017-10- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled planejamento e orientação 05 19 06 27 Initiatives sobre como serão formados os grupos de trabalho a cada etapa SUB 127-1 / Servico de cozinheira 1 para Component 1: Sustainable cozimentos alimentos da 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled primeira etapa construcao 20 04 18 07 Initiatives de centro de revitalizacao da cultura e visitacao SUB 127-2 / Servico de cozinheira 2 para Component 1: Sustainable cozimentos alimentos 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled primeira etapa construcao 20 04 18 07 Initiatives de centro de revitalizacao da cultura e visitacao. SUB 127-3 / Servico de cozinheira 1 para Component 1: Sustainable cozimentos alimentos 2017-12- 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled segunda etapa construcao 15 28 15 04 Initiatives de centro de revitalizacao da cultura e visitacao SUB 127-4 / Servico de cozinheira 2 para Component 1: Sustainable cozimentos alimentos 2017-12- 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled segunda etapa construcao 15 28 15 04 Initiatives de centro de revitalizacao da cultura e visitacao Page 13 SUB 127-5 / Servico de mao de obra indigena 1 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indigena SUB 127-6 / Servico de mao de obra indigena 2 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indígena SUB 127-7 / Servico de mao de obra indigena 3 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indígena SUB 127-8 / Servico de mao de obra indigena 4 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indígena SUB 127-9 / Servico de mao de obra indigena 5 Component 1: Sustainable 2017-11- 2017-12- 2017-12- 2018-04- para construcao e instalacao TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 07 26 05 do centro cultural nos Initiatives moldes tradicional indígena SUB 127-10 / Servico de mao de obra profissional Component 1: Sustainable indigena para retirada de 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled madeiras para construcao 24 08 21 30 Initiatives do centro de revitalizacao da cultura e visita SUB 127-11 / Servico de auxiliar mao de obra 1 para Component 1: Sustainable retirada de madeiras para 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled construcao do centro de 24 08 21 30 Initiatives revitalizacao da cultura e visita SUB 127-12 / Servico de auxiliar mao de obra 2 para Component 1: Sustainable retirada de madeiras para 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled construcao do centro de 24 08 21 30 Initiatives revitalizacao da cultura e visita SUB 127-13 / Servico de auxiliar mao de obra 3 para Component 1: Sustainable retirada de madeiras para 2017-11- 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled construcao do centro de 24 08 21 30 Initiatives revitalizacao da cultura e visita SUB 127-14 / Servico de de Component 1: Sustainable desenvolvimento de website Request for Single Stage - One 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e treinamento para Quotations Envelope 12 03 22 Initiatives alimentacao do site SUB 127-15 / Contratação de frete comunitário Component 1: Sustainable indigena para transporte de Request for Single Stage - One 2017-12- 2018-01- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled madeira e palhas que serão Quotations Envelope 12 04 03 Initiatives utilizadas na construção do Centro de Revitalizacao - frete 1 SUB 127-17 / Servico de frete comunitario indigena Component 1: Sustainable para transporte de madeira Request for Single Stage - One 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e palhas que serao Quotations Envelope 07 26 25 Initiatives utilizadas na construcao do Centro de Revitalizacao - frete 3 SUB 127-18 / Servico de frete comunitario indigena Component 1: Sustainable para transporte de madeira Request for Single Stage - One 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e palhas que serao Quotations Envelope 07 26 25 Initiatives utilizadas na construcao do Centro de Revitalizacao - frete 4 SUB 127-19 / Servicos para Component 1: Sustainable criacao de layout e Request for Single Stage - One 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled impreessao de folders para Quotations Envelope 07 21 19 Initiatives divulgacao do projeto SUB 127-20 / Servicos de Component 1: Sustainable confeccao de camisetas para Request for Single Stage - One 2017-12- 2017-12- 2018-02- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled divulgacao do Centro de Quotations Envelope 04 22 10 Initiatives Revitalizacao SUB 127-22 / Servico de Component 1: Sustainable empreita de mao de obra de Request for Single Stage - One 2017-12- 2018-01- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled ajudante de pedreiro para Quotations Envelope 28 15 25 Initiatives construcao do centro SUB 16-5 / CQ16-5 Serviço Component 1: Sustainable Request for Single Stage - One 2017-06- 2018-01- 2017-07- 2018-01- 2017-08- 2018-02- de confecção de banner TF / 18765 and Adaptive Community Post Limited 70.49 Completed Quotations Envelope 29 10 23 24 07 05 para divulgação do Initiatives subprojeto SUB 26-11 / CT26.11 Contratacao de maquinario Component 1: Sustainable Pending Request for Single Stage - One 2017-11- 2017-12- 2018-01- por hora para fazer TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 29 23 22 barraginhas em duas grotas Initiatives ation da comunidade SUB 16-16 / Serviços de Component 1: Sustainable Request for Single Stage - One 2017-11- 2017-12- 2017-12- 2018-02- 2017-12- 2018-03- Confecção de camisetas de TF / 18765 and Adaptive Community Post Limited 396.51 Completed Quotations Envelope 20 11 12 22 29 28 divulgação do Subprojeto. Initiatives SUB 142 -3 / Servicos acompanhamento do Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-12- processo de abertura da TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 23 06 15 18 23 21 roCa e producao do Initiatives Development ation relatorio - comunitário 1 SUB 125 - 1 / Serviço de Component 1: Sustainable Community Pending 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- tratorista indígena para TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 18 01 08 10 19 20 correção do solo. Initiatives Development ation SUB 125 - 2 / Serviço de Component 1: Sustainable Community Pending instrutor para ministrar 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement oficina de capacitação na 18 01 08 12 19 20 Initiatives Development ation correção de solo. Component 1: Sustainable Community Pending SUB 125 - 4 / Serviço de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement confecção de camisetas. 22 05 15 16 23 26 Initiatives Development ation SUB 125 - 6 / Serviço de Component 1: Sustainable Community Pending 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- análise de amostra de solo TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 28 11 18 22 29 30 em laboratório. Initiatives Development ation SUB 125 - 7 / Serviço de instrutor para ministrar Component 1: Sustainable Community 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- oficina de aplicação de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 28 11 18 22 29 28 composto de Initiatives Development micronutrientes e adubos orgânicos. SUB 124 - 1 / Contratação de serviços para Component 1: Sustainable Community acompanhamento técnico 2018-01- 2018-09- 2018-01- 2018-09- 2018-02- 2018-09- 2018-02- 2018-10- 2018-02- 2018-11- 2019-10- TF / 18765 and Adaptive Community Post Driven Limited 4,254.74 Signed do projeto para Orientação 12 27 26 28 05 27 06 23 13 01 07 Initiatives Development técnica de plantio e manutenção de áreas de SAF. SUB 124 - 6 / Aquisição de Component 1: Sustainable Community 2018-01- 2019-04- 2018-02- 2019-04- 2018-02- 2019-04- 2018-02- 2019-04- 2018-02- 2019-04- 2018-04- 2019-10- mudas de plantas nativas TF / 18765 and Adaptive Community Post Driven Limited 4,304.14 Completed 24 08 07 08 16 09 19 11 26 11 26 09 para recuperação de áreas. Initiatives Development SUB 124 - 7 / Aquisição de sementes diversas de Component 1: Sustainable Community 2018-01- 2019-10- 2018-02- 2019-10- 2018-02- 2019-10- 2018-02- 2019-11- 2018-02- 2019-11- 2018-04- 2019-12- leguminosas e ou crioulas, TF / 18765 and Adaptive Community Post Driven Limited 1,326.13 Completed 29 29 12 29 20 29 22 11 28 18 30 18 aquisição de calcário para Initiatives Development correção de PH do solo AI2 - 2 / Contratação de Component 1: Sustainable Community serviço de impressão para 2017-12- 2018-08- 2017-12- 2018-09- 2018-01- 2018-10- 2018-01- 2018-10- 2018-01- 2018-10- 2019-01- 2019-07- TF / 18765 and Adaptive Community Post Driven Limited 3,358.93 Completed produção de peças de 16 28 30 12 06 11 08 11 17 17 12 17 Initiatives Development comunicação. SUB 100 - 1 / Contratação de serviço de mediador para Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-05- encontro do grupo de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 25 08 17 19 26 28 soberania alimentar - roças Initiatives Development ation tradicionais e desafio de hoje. SUB 85 - 1 / Serviço de Component 1: Sustainable Community Assessoria técnica para 2018-01- 2018-03- 2018-01- 2018-03- 2018-02- 2018-03- 2018-02- 2018-04- 2018-02- 2018-05- 2019-07- TF / 18765 and Adaptive Community Post Driven Limited 11,516.31 Signed recuperação das áreas 15 23 29 23 05 26 09 24 16 07 21 Initiatives Development degradadas. AI1 - 1 / Serviço de articulação indígena para Component 1: Sustainable Community Pending dar suporte no 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement planejamento, mobilizar os 09 22 30 31 06 07 Initiatives Development ation participantes indígenas, elaborar relatoria - ARTICULADOR 1 AI1 - 2 / Serviço de articulação indígena para Component 1: Sustainable Community Pending dar suporte no 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement planejamento, mobilizar os 22 29 30 31 06 07 Initiatives Development ation participantes indígenas, elaborar relatoria - ARTICULADOR 2. AI1 - 3 / Contratação de serviço de técnico especializado de terceiros Component 1: Sustainable Community Pending 2017-12- 2017-12- 2017-12- 2017-12- 2018-01- 2018-05- para elaboração de site TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 05 18 26 28 02 02 institucional e treinamento Initiatives Development ation de indígena para atualização de conteúdos. AI1 - 4 / Contratação de serviço logística com locação de espaço de Component 1: Sustainable Community Pending reunião, hospedagem e 2017-12- 2017-12- 2017-12- 2017-12- 2018-01- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement alimentação para realização 05 18 26 27 02 02 Initiatives Development ation de eventos do Planejamento Estratégico para fortalecimento político e institucional da MOPIC. AI3 - 1 / Contratação de serviço de confecção de material de divulgação da Component 1: Sustainable Community 2017-12- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-01- 2018-02- 2019-02- 2018-05- 2019-02- feira dos produtos do TF / 18765 and Adaptive Community Post Driven Limited 761.39 Completed 26 25 08 25 15 29 19 31 26 01 28 11 babaçu e agricultura Initiatives Development familiar como banners, bandeiras e faixas e outros. BR-CAA-39558-NC-RFQ / Contratacao de empresa para fornecimento de serviço de coffe break para Component 3: Project Pending realizacao de treinamento e Request for Single Stage - One 2018-01- 2018-02- 2018-03- TF / 18765 Management, Monitoring Post Limited 0.00 Implement planejamento equipe e Quotations Envelope 15 03 05 and Evaluation ation estagiarios para visita de checagem do segundo edital do projeto DGM. A ser realizado em Montes Claros MG SUB 98 - 16 / Contratacao de profissional tecnica para Component 1: Sustainable Community Pending 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-04- assessorar no mapeamento TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 19 29 12 14 20 21 das areas de abundância no Initiatives Development ation entorno da aldeia Porteira. SUB 135-24 / Serviços de mao de obra especializada Component 1: Sustainable Community Pending em bio construcao para 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement execucao e 22 01 09 12 16 17 Initiatives Development ation acompanhamento de construcao de galpao para armazenamento de sementes SUB 26-17 / CT26.17 Contratacao de profissional Component 1: Sustainable tecnico para fazer o Request for Single Stage - One 2017-07- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled mapeamento da morraria Quotations Envelope 31 30 29 Initiatives com entrega do mapa etnoambiental SUB 108-27 / Contratacao de prestação de servicos Component 1: Sustainable Community Pending para realizacao de 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement capacitacao em boas 22 02 12 15 22 23 Initiatives Development ation praticas para produção de alimentos tecnicas comunitarias SUB 108-28 / Contratacao de prestacao de servicos Component 1: Sustainable Community Pending para realizacao de 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-05- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement capacitacao em gestao da 22 05 12 15 22 23 Initiatives Development ation unidade de beneficiamento produtos locais SUB 113-21 / Contratacao Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-05- de oficineiro para realizacao TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 25 08 15 21 01 20 de oficina de apicultura Initiatives Development ation SUB 142-16 / Serviços acompanhamento do Component 1: Sustainable Community Pending 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-12- processo de abertura da TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 23 06 15 19 24 21 roça e produção do relatório Initiatives Development ation - comunitário 2 SUB 91-10 / Serviço Técnico de apoio para execução do projeto no processo de implantação do Component 1: Sustainable Community 2018-01- 2020-07- 2018-02- 2020-07- 2018-02- 2020-07- 2018-02- 2020-07- 2018-02- 2020-07- 2018-07- 2020-08- viveiro de mudas, de TF / 18765 and Adaptive Community Post Driven Limited 1,144.36 Completed 25 17 07 17 15 22 19 24 26 28 06 11 beneficiamento de sementes Initiatives Development para plantio na fase de estufa, planejamento e orientação técnica na recuperação da APP. SUB 98 - 4 / Serviço Técnico de apoio para execução do projeto para Component 1: Sustainable Community 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-04- ministrar um curso aos TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 22 30 12 16 23 24 membros da diretoria da Initiatives Development associação e comunidade sobre rotinas administrativas. SUB 88-7 / Serviço Técnico Component 1: Sustainable Request for Single Stage - One 2018-01- 2018-02- 2019-05- de apoio para execução do TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 29 15 12 projeto. Initiatives SUB 30 - 11 / Serviço de Component 1: Sustainable instrutor para capacitação Request for Single Stage - One 2017-11- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled na área de gestão Quotations Envelope 11 28 29 Initiatives administrativa e financeira . SUB 30 - 12 / Serviço de Component 1: Sustainable instrutor para capacitação Request for Single Stage - One 2017-10- 2017-11- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled na área de elaboração de Quotations Envelope 28 14 15 Initiatives projetos. SUB 30 - 13 / Serviço de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- instrutor para capacitação TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 25 25 em gestão e legislação Initiatives ambiental. SUB 30-34 / SUB 30-34 Component 1: Sustainable Community Pending Serviço de apoio operacional 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-06- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para execução das 15 22 05 09 16 01 Initiatives Development ation atividades subprojeto TAPAGUIA. SUB 143 -1 / SUB 143 -1 Serviço de apoio operacional Component 1: Sustainable Community Pending 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-03- para execução das TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 15 25 02 03 05 14 atividades subprojeto Povos Initiatives Development ation do Roncador. SUB 93-1 / SUB 93-1 Component 1: Sustainable Community Serviço de apoio operacional 2018-01- 2018-04- 2018-01- 2018-04- 2018-02- 2018-04- 2018-02- 2018-05- 2018-02- 2018-05- 2018-12- TF / 18765 and Adaptive Community Post Driven Limited 3,615.52 Signed para execução das 12 19 19 19 02 20 06 04 13 28 10 Initiatives Development atividades subprojeto Pyka Mix. SUB 125 - 5 / SUB 125 - 5 Component 1: Sustainable Community Pending serviço de apoio operacional 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2019-10- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para execução das 19 02 09 12 19 13 Initiatives Development ation atividades subprojeto Terena. SUB 108-26 / SUB 108-26 Component 1: Sustainable Community Pending serviço de apoio operacional 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-07- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para execução das 16 22 05 09 16 01 Initiatives Development ation atividades subprojeto Yomono. SUB 134-14 / SUB 134-14 Component 1: Sustainable Community Serviço de apoio operacional 2018-01- 2018-06- 2018-01- 2018-06- 2018-02- 2018-06- 2018-02- 2018-06- 2018-02- 2018-07- 2019-03- TF / 18765 and Adaptive Community Post Driven Limited 3,022.75 Signed para execução das 19 20 29 20 12 20 14 20 21 27 28 Initiatives Development atividades subprojeto UBAWAWE. SUB 25-8 N / Serviços Component 1: Sustainable gráficos de impressão de Request for Single Stage - One 2018-05- 2018-06- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled apostila para atividade Quotations Envelope 15 04 06 Initiatives Oficina sobre plantio de mudas. SUB 25-11 N / Serviços Component 1: Sustainable Request for Single Stage - One 2019-01- 2019-02- 2019-03- gráficos de impressão de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 19 23 cartilha. Initiatives Page 14 SUB 120-1 / Contratação Component 1: Sustainable 2017-09- 2017-10- 2017-10- 2019-03- de serviços de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 21 05 23 07 cozinheiras/os Initiatives SUB 120-2 / Contratação Component 1: Sustainable 2017-08- 2017-09- 2017-09- 2019-05- de serviços de articuladores TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 28 11 28 22 indígenas. Initiatives SUB 26 -15 / SUB 26.15 Component 1: Sustainable Community Under Serviço de apoio operacional 2018-02- 2017-10- 2018-03- 2017-10- 2018-04- 2017-11- 2018-05- 2018-06- 2018-12- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement para execução das 28 24 05 31 16 07 16 20 17 Initiatives Development ation atividades subprojeto ARPEP SUB 25- 7 N / Serviço de Component 1: Sustainable Community Pending 2018-02- 2018-02- 2018-03- 2018-03- 2018-03- 2019-12- apoio operacional para a TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 22 28 09 12 16 26 execução do subprojeto. Initiatives Development ation SUB 25-9 N / Serviço de fornecimento diversos lanches produzidos para as capacitações, Formação da Component 1: Sustainable Pending comunidade sobre Request for Single Stage - One 2018-03- 2018-04- 2018-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement recuperação ambiental, Quotations Envelope 20 06 04 Initiatives ation Identificação de nascentes, Oficina sobre plantio de mudas, Seminário temático em agroecologia e avaliação. SUB 100 -10 / Contratação de serviço de apoio Component 1: Sustainable Community 2018-03- 2018-06- 2018-03- 2018-06- 2018-04- 2018-06- 2018-04- 2018-07- 2018-04- 2018-07- 2019-12- operacional para TF / 18765 and Adaptive Community Post Driven Limited 8,646.39 Signed 15 06 22 06 05 21 09 20 16 20 07 implantação de sistemas Initiatives Development agroflorestais e práticas de manejo SUB 116-25 / CT116.25 Component 1: Sustainable Contratação de serviços Request for Single Stage - One 2017-08- 2020-07- 2017-09- 2020-08- 2017-10- 2020-08- TF / 18765 and Adaptive Community Post Limited 1,410.36 Completed para montagem de seis Quotations Envelope 21 20 13 06 23 12 Initiatives sistemas de irrigação SUB 116-26 / CT116.26 Component 1: Sustainable Contratação de serviços Request for Single Stage - One 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para montagem de seis Quotations Envelope 25 14 19 Initiatives estufas das hortas SUB 116-27 / CT116.27 Contratação de serviços técnico as famílias beneficiarias para Component 1: Sustainable Implantação dos três Request for Single Stage - One 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Agroquintais Aspectos de Quotations Envelope 02 25 24 Initiatives abertura de berços e plantio das mudas Preparo de defensivos naturais Orientação das familias sobre tratos culturais e adubacao SUB 116-28 / CT116.28 Cotratacao de serviços técnicos para Mobilização Curso teórico e pratico Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2018-06- sobre a coleta seletiva e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 03 28 24 destinação do lixo Initiatives Monitoramento da coleta seletiva do lixo e elaboração de relatórios sobre a poluicao da comunidade SUB 116-29 / CT116.29 Contratação de serviços técnicos para: Mobilização Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2019-06- de famílias aptas a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 18 10 comercializar Initiatives Acompanhamento e orientação dos produtores nas feiras SUB 116-30 / CT116.30 Contratação de serviços Component 1: Sustainable técnicos para orientação Request for Single Stage - One 2017-10- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled pratica sobre o processo de Quotations Envelope 31 23 02 Initiatives decantação simples da água do rio SUB 116-31 / CT116.31 Contratação de serviços Component 1: Sustainable técnicos para mapeamento Request for Single Stage - One 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled das famílias que precisam Quotations Envelope 20 12 24 Initiatives do CAR e Georeferenciamento das áreas para gerar o CAR SUB 116-32 / CT116.32 Contratação de serviços técnico para treinamento as família quanto a Preparação Component 1: Sustainable das áreas para receber as Request for Single Stage - One 2017-08- 2017-09- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled hortas Preparação e plantio Quotations Envelope 11 04 03 Initiatives de canteiros Transplante das mudas Orientação as famílias sobre preparo de defensivos natuais SUB 116-33 / CT116.33 Contratação de serviços de assessoramento técnico Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2018-05- para Avaliação e TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 19 17 monitoramento dos Initiatives resultados e Estruturação de quatro relatórios descritivos de atividades SUB 116-35 / Serviço de Component 1: Sustainable Community apoio operacional para 2018-03- 2018-06- 2018-03- 2018-06- 2018-04- 2018-06- 2018-04- 2018-06- 2018-04- 2018-07- 2019-12- TF / 18765 and Adaptive Community Post Driven Limited 15,211.48 Signed execução das atividades 15 19 22 19 04 28 09 30 17 31 08 Initiatives Development subprojeto ASSEMA SUB 129 - 8 / Contratação de serviços de apoio Component 1: Sustainable Community Pending 2018-07- 2018-07- 2018-08- 2018-08- 2018-08- 2018-10- operacional para articulação TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 11 23 02 10 30 30 de atividades de produção Initiatives Development ation do artesanato e monitoramento do território. SUB 129 - 10 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2018-07- 2018-08- 2018-11- de serviços de moderador TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 30 01 de oficina sobre comércio Initiatives ation justo. SUB 129 - 12 / Contratação Component 1: Sustainable Pending de serviços de edição de Request for Single Stage - One 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement vídeos, a ser realizado por Quotations Envelope 23 30 01 Initiatives ation um indígena da comunidade. SUB 129 - 13 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2018-07- 2018-08- 2018-10- de mão de obra de pedreiro TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 30 01 para construção de galpão. Initiatives ation SUB 129 - 14 / Contratação Component 1: Sustainable Pending Request for Single Stage - One 2018-06- 2018-08- 2018-10- de serviços de transporte de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 30 01 passageiros para Initiatives ation expedições. SUB 123 -3 / Contratação de técnico em Component 1: Sustainable bioconstrução para Request for Single Stage - One 2018-03- 2018-04- 2018-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled construção de forno para Quotations Envelope 28 10 11 Initiatives queima de cerâmica, conforme os conhecimentos tradicionais. SUUB 129 - 9 / Contratação Component 1: Sustainable Pending de serviços de moderador Request for Single Stage - One 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de oficina sobre economia Quotations Envelope 23 30 31 Initiatives ation solidária. SUB 129 - 11 / Contratação Component 1: Sustainable de serviços de captação de Request for Single Stage - One 2018-07- 2018-08- 2018-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled imagens das atividades do Quotations Envelope 23 30 30 Initiatives projeto na aldeia. SUB 142-15 / Serviços de edição de videos a partir Component 1: Sustainable Community 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2018-08- dos registros audiovisuais TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 15 29 05 09 16 15 realizados nas oficinas e na Initiatives Development festa de colheita do milho SUB 142 -2 / Contratação de apoio operacional para Component 1: Sustainable Community acompanhamento e 2018-01- 2018-05- 2018-02- 2018-05- 2018-02- 2018-05- 2018-02- 2019-05- 2018-02- 2019-06- 2018-03- 2020-02- TF / 18765 and Adaptive Community Post Driven Limited 3,764.56 Completed avaliação de oficinas e 23 14 06 16 15 25 18 28 23 11 26 20 Initiatives Development atividades do projeto e apoio à edição e registro de imagens captadas. SUB 98 -3 / Contratação de profissional técnico para Component 1: Sustainable Community elaboração do projeto do 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled viveiro para produção de 15 29 05 09 16 17 Initiatives Development 10.000 mudas/ano (nativas e frutíferas). SUB 105-16 / Contratação de agente local para Component 1: Sustainable Community Pending mobilização e 2018-05- 2018-05- 2018-05- 2018-05- 2018-06- 2020-01- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement acompanhamento das 10 13 23 28 03 24 Initiatives Development ation atividades do projeto na Comunidade Quilombola Carrapato. SUB 105-19 / Contratação Component 1: Sustainable Community Pending de agente local para 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-06- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement acompanhamento a 20 23 02 05 13 08 Initiatives Development ation Caravana Quilombola do Jalapão. SUB 105-17 / Contratação de agente local para Component 1: Sustainable Community Pending mobilização e 2018-05- 2018-05- 2018-05- 2018-06- 2018-06- 2020-01- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement acompanhamento das 10 13 23 04 09 30 Initiatives Development ation atividades do projeto na comunidade quilombola Barra do Aroeira. SUB 129 - 7 / Contratação de serviços com Component 1: Sustainable Pending Request for Single Stage - One 2018-07- 2018-08- 2018-10- acompanhamento da obra TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 30 29 do ateliê, nos moldes da Initiatives ation bioconstrução. SUB 105-4 / CQ105.4 Contratação de Agente Local Component 1: Sustainable Community comunitário para 2018-05- 2018-08- 2018-05- 2018-08- 2018-05- 2018-07- 2018-05- 2018-08- 2018-05- 2018-08- 2019-10- TF / 18765 and Adaptive Community Post Driven Limited 3,561.71 Signed mobilização e apoio nas 10 03 13 03 16 20 19 29 24 29 06 Initiatives Development atividades para Comunidade Quilombola Prada. SUB 105-18 / Contratação de agente local para Component 1: Sustainable Community Pending mobilização e 2018-05- 2018-05- 2018-06- 2018-07- 2018-08- 2019-02- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement acompanhamento das 10 13 24 24 28 24 Initiatives Development ation atividades do projeto na comunidade quilombola Boa Esperança. SUB 16-18 / Contratação Component 1: Sustainable Community de serviço de apoio 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- 2019-11- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled operacional para execução 15 20 30 04 08 29 Initiatives Development do projeto técnico subprojeto 16 SUB 42-17 / Serviços de serraria para construção de Component 1: Sustainable uma base de apoio para 2017-09- 2017-10- 2017-10- 2018-02- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled vigilância (barracão) em 22 06 24 02 Initiatives local estratégico na terra indígena krahô-kanela SUB 42-19 / Serviços de Component 1: Sustainable 2017-10- 2017-11- 2017-11- 2018-01- mão de obra 1 para TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 25 08 25 25 abertura de poço Initiatives SUB 42-20 / Serviços de Component 1: Sustainable 2017-10- 2017-11- 2017-11- 2018-01- mão de obra 2 para TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 25 08 25 25 abertura de poço Initiatives SUB 42-21 / Serviços de Component 1: Sustainable 2017-10- 2017-11- 2017-11- 2018-01- mão de obra 3 para TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 25 08 25 25 abertura de poço. Initiatives SUB 3-12 / Contratação de serviços de operador de Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-11- 2017-12- máquina para oficina de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 27 03 14 capacitação de construção Initiatives de barraginhas. SUB 3-13 / Contratação de Component 1: Sustainable serviços de locação de Request for Single Stage - One 2017-10- 2017-11- 2017-12- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled caminhão para transporte Quotations Envelope 02 07 19 Initiatives de pá carregadeira. SUB 3-17 / Serviço de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- manutenção de pá TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 13 30 29 carregadeira. Initiatives SUB 16-15 / CQ16-15 Contratação de profissional Component 1: Sustainable Request for Single Stage - One 2017-06- 2017-08- 2017-11- para ministrar oficina para TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 25 03 01 implantação de sistemas Initiatives agroflorestais SUB 16-22 / Contratação Component 1: Sustainable de profissional para realizar Request for Single Stage - One 2018-05- 2018-08- 2018-06- 2018-08- 2018-10- 2019-05- TF / 18765 and Adaptive Community Post Limited 1,980.00 Completed serviço de cercamento das Quotations Envelope 30 01 17 23 15 23 Initiatives nascentes. SUB 120-5 / Contratação de serviços para captação e edição de imagens para Component 1: Sustainable Pending produção de vídeo Request for Single Stage - One 2017-09- 2017-10- 2019-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement documentário sobre o Quotations Envelope 29 17 10 Initiatives ation movimento das Mulheres Yarang, no Território Indígena do Xingu. SUB 109-12 / CT109.12 Contratação de profissional para assessoramento da reforma e da planta da Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2018-04- agroindústria com os TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 16 03 gestores públicos Initiatives regulamentadores da legislação sanitária e Realizar treinamento boas praticas comercialização SUB 42-6 / Serviço de 01 pedreiro para realizar a Component 1: Sustainable adequação de barracão para Request for Single Stage - One 2017-09- 2018-07- 2017-10- 2018-08- 2017-11- 2018-12- TF / 18765 and Adaptive Community Post Limited 2,342.53 Completed servir de sede do projeto e Quotations Envelope 19 18 06 22 06 20 Initiatives para acondicionar equipamentos BR-CAA-39551-NC-RFQ / Contratação de serviços para realização de evento para cerca de 20 pessoas, Component 1: Sustainable em Montes Claros-MG: Request for Single Stage - One 2018-07- 2018-07- 2018-08- 2018-07- 2018-09- 2018-08- TF / 18765 and Adaptive Community Post Limited 5,943.86 Completed Oficina de Elaboração de Quotations Envelope 17 24 03 31 02 30 Initiatives Projetos, incluindo as etapas de hospedagem, alimentação e locação de espaço e equipamentos. BR-CAA-39552-NC-RFQ / Contratação de serviços para realização de evento para cerca de 20 pessoas, Component 1: Sustainable Pending em Brasília-DF: Oficina de Request for Single Stage - One 2018-07- 2018-08- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement Elaboração de Projetos, Quotations Envelope 22 08 07 Initiatives ation incluindo as etapas de hospedagem, alimentação e locação de espaço e equipamentos. BR-CAA-39553-NC-RFQ / Contratação de serviços para realização de evento para cerca de 20 pessoas, Component 1: Sustainable em Cuiabá-MT: Oficina de Request for Single Stage - One 2018-07- 2018-08- 2018-08- 2018-08- 2018-09- 2018-09- TF / 18765 and Adaptive Community Post Limited 11,589.51 Completed Elaboração de Projetos, Quotations Envelope 27 02 13 14 12 28 Initiatives incluindo as etapas de hospedagem, alimentação e locação de espaço e equipamentos. BR-CAA-39554-NC-RFQ / Contratação de profissional especializado em Component 1: Sustainable Pending Educomunicação /midias Request for Single Stage - One 2018-07- 2018-08- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement sociais para sensibilização Quotations Envelope 17 03 02 Initiatives ation dos subprojetos na importância do uso do plano de comunicação. BR-CAA-39555-NC-RFQ / Contratação de serviços de projeto e produção gráfica Component 2: Capacity Pending Request for Single Stage - One 2018-07- 2018-08- 2018-09- de cartilha para divulgação TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 17 03 02 dos projetos, com entrega Strengthening ation de arquivos para publicação digital e para impressão. AI2 - 1 / Contratação de Component 1: Sustainable Community serviços de contabilidade 2018-08- 2018-10- 2018-08- 2018-10- 2018-09- 2018-11- 2018-09- 2018-11- 2018-09- 2018-11- 2019-09- 2019-02- TF / 18765 and Adaptive Community Post Driven Limited 3,655.28 Completed para realização de 20 30 25 30 04 01 06 14 13 26 08 08 Initiatives Development balancetes anuais da Rede Cerrado. Page 15 BR-CAA-39550-NC-RFQ / Contratação de serviços para fornecimento de alimentação (lanche, almoço Component 2: Capacity e jantar) para 4 Request for Single Stage - One 2018-09- 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- TF / 18765 Building and Institutional Post Limited 6,800.12 Completed capacitações, para público Quotations Envelope 10 12 30 11 29 10 Strengthening composto de sócios do CAA e membros dos subprojetos, a ser realizada em Montes Claros - Público total de 130 pessoas. BR-CAA-39556-NC-RFQ / Contratação de serviços de tabulação de dados das Component 2: Capacity Pending Request for Single Stage - One 2018-09- 2018-10- 2018-12- pesquisas realizadas TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 12 04 03 durante as visitas de Strengthening ation checagem dos subprojetos dos editais 1 e 2 (marco 0). SUB 100 -15 / Serviços de Component 1: Sustainable Pending diagramação e impressão de Request for Single Stage - One 2018-11- 2018-12- 2019-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement materiais de divulgação da Quotations Envelope 17 10 08 Initiatives ation cultura indígena chiquitano. SUB 100 -17 / Contratação de serviços de locação de Component 1: Sustainable Pending Request for Single Stage - One 2018-11- 2018-12- 2019-01- transporte - participantes TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 10 09 de intercâmbio e atividades Initiatives ation do projeto. SUB 125-29 / Contratação Component 1: Sustainable Pending de Empresa de Engenharia e Request for Single Stage - One 2018-12- 2018-12- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement obras para construção de Quotations Envelope 01 20 19 Initiatives ation unidade de beneficiamento SUB 127-21 / Servico de Component 1: Sustainable Pending empreita de mao de obra de Request for Single Stage - One 2017-12- 2018-01- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Implement pedreiro para construcao do Quotations Envelope 28 15 25 Initiatives ation centro SUB 75-11 / Contratação de serviços de pedreiro para Component 1: Sustainable Pending Request for Single Stage - One 2018-12- 2019-01- 2019-07- construção do Centro de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 26 25 Turismo Sustentável, para Initiatives ation os Festejos Kalungas. AI3 - 2 / Contratação de serviço transporte de duas vans da regional Pará até Component 1: Sustainable Community Pending 2019-01- 2019-01- 2019-01- 2019-01- 2019-02- 2019-03- São Domingos do Araguaia, TF / 18765 and Adaptive Community Post Driven Limited 0.00 Implement 21 23 30 31 03 05 para participar do VIII Initiatives Development ation Encontrão das Quebradeiras de Coco Babaçu AI3 - 3 / Contratação de serviço transporte de ônibus para deslocamento das mulheres da regional Component 1: Sustainable Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-02- 2019-03- 2019-02- Imperatiz até São Domingos TF / 18765 and Adaptive Community Post Limited 3,169.34 Completed Quotations Envelope 23 01 03 05 05 12 do Araguaia - PA, para Initiatives participar do VIII Encontrão das Quebradeiras de Coco Babaçu AI3- 4 / Contratação de serviço transporte de ônibus para deslocamento das mulheres da regional Component 1: Sustainable Pending Request for Single Stage - One 2019-01- 2019-02- 2019-03- Tocantins até São Domingos TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 03 05 do Araguaia - PA, para Initiatives ation participar do VIII Encontrão das Quebradeiras de Coco Babaçu AI3 - 6 / Contratação de serviço transporte de ônibus para deslocamento das mulheres das regionais Component 1: Sustainable Pending Request for Single Stage - One 2019-01- 2019-02- 2019-03- Baixada e Mearim Tocantins TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 03 05 até São Domingos do Initiatives ation Araguaia - PA, para participar do VIII Encontrão das Quebradeiras de Coco Babaçu AI3 - 7 / Contratação de serviço transporte de ônibus para deslocamento das Component 1: Sustainable mulheres da regional Piauí Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-02- 2019-03- 2019-02- TF / 18765 and Adaptive Community Post Limited 1,804.30 Completed até São Domingos do Quotations Envelope 23 01 03 04 05 12 Initiatives Araguaia - PA, para participar do VIII Encontrão das Quebradeiras de Coco Babaçu AI3 - 3 / Contratação de serviços audiovisuais pessoa Component 1: Sustainable Community 2018-03- 2018-03- 2018-04- 2018-04- 2018-04- 2018-07- física para produção de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 14 28 04 09 16 16 filmes, fotografias, áudio, Initiatives Development entre outras atividades. BR-CAA-39560-NC-RFQ / Contratação de serviços de transporte para realização Component 2: Capacity Under de traslado - aeroporto- Request for Single Stage - One 2019-01- 2019-02- 2019-02- 2019-03- TF / 18765 Building and Institutional Post Limited 0.00 Implement rodoviária/hotel/aeroporto- Quotations Envelope 26 06 09 11 Strengthening ation rodoviária e dia de campo, durante participação de curso a ser realizado em Brasília/DF BR-CAA-39561-NC-RFQ / Component 2: Capacity Pending Contratação de serviços Request for Single Stage - One 2019-01- 2019-02- 2019-03- TF / 18765 Building and Institutional Post Limited 0.00 Implement para impressão de agendas Quotations Envelope 26 09 26 Strengthening ation personalizadas. BR-CAA-39562-NC-RFQ / Contratação de empresa especializada, para Component 3: Project Request for Single Stage - One 2019-02- 2019-04- 2019-03- 2019-04- 2020-12- realização de auditoria TF / 18765 Management, Monitoring Post Limited 12,739.29 Signed Quotations Envelope 07 04 07 26 16 externa na documentação and Evaluation relativa ao projeto, nos exercícios de 2018, 2019 e 2020. SUB 16-6 / CQ16-6 Serviços de moderação e Component 1: Sustainable instrução de instrutor da 2017-06- 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled comunidade para ministrar 19 09 23 06 Initiatives a oficina de Conhecimentos de Plantas Medicinais do Cerrado SUB 26-13 / CT26.13 Component 1: Sustainable 2017-08- 2017-08- 2017-09- 2017-11- Contratacao de serviço geral TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 18 23 15 14 de viveirista por diarias Initiatives SUB 26-14 / CT26.14 Component 1: Sustainable 2017-11- 2017-11- 2017-12- 2018-02- Contratacao de servico de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 22 27 20 18 pedreiro por diaria Initiatives SUB 110-19 / Serviços gráficos de impressão de Component 1: Sustainable Pending material didático para as Request for Single Stage - One 2017-08- 2017-08- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement oficinas de capacitação em Quotations Envelope 02 24 21 Initiatives ation Recuperação Ambiental e Agroecologia. + Banner SUB 110-20 / CQ110.20 Contratação de serviços gerais, por diária, para Component 1: Sustainable 2017-07- 2017-08- 2017-08- 2017-11- cercamento da área critica TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 26 05 14 12 para fins de regeneração Initiatives natural manejo agroflorestal agroecológico SUB 110-21 / CQ110.21 Contratação de serviços Component 1: Sustainable gerais, por diária, de 2017-11- 2017-11- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled pedreiro para construção do 20 30 11 30 Initiatives viveiro e sala de armazenamento de sementes SUB 110-22 / CQ110.22 Contratação de serviços Component 1: Sustainable gerais, por diária, para 2017-07- 2017-08- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled implantação de paliçadas 26 05 15 24 Initiatives para barreiras de contenção em voçorocas SUB 110-24 / CQ110.24 Contratação de serviços gerais, por diária, de Component 1: Sustainable 2017-07- 2017-08- 2017-08- 2019-04- cozinheira para oficinas de TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 27 06 23 15 capacitação, reuniões Initiatives mensais organizativas e de monitoramento SUB 268 SC 6 / Contratação de oficineiro para realização Component 1: Sustainable Pending Request for Single Stage - One 2019-02- 2019-03- 2019-06- de 3 oficinas de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 15 05 04 aperfeiçoamento do Initiatives ation artesanato produzido SUB 268 SC 07 / Component 1: Sustainable Pending Request for Single Stage - One 2019-02- 2019-03- 2019-06- Contratação de profissional TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 09 08 para construção de web site Initiatives ation SUB 173 SC 004 / Contratação de serviços de Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-09- 2019-03- 2019-10- 2020-01- pedreiro comunitário para TF / 18765 and Adaptive Community Post Limited 3,822.67 Signed Quotations Envelope 19 30 09 09 04 execução da obra de Initiatives unidade de beneficiamento SUB 218 SC 002 / Aluguel de micro-ônibus/ônibus Component 1: Sustainable Pending Request for Single Stage - One 2019-02- 2019-03- 2020-01- para transporte dos TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 16 06 01 participantes dos mutirões Initiatives ation de resgate das tradições SUB 166 SC 001 / Component 1: Sustainable Contratação de empresa Request for Single Stage - One 2019-02- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para realização de obra da Quotations Envelope 19 09 09 Initiatives cozinha para processamento SUB 45-7 / CT45.7 Component 1: Sustainable Request for Single Stage - One 2017-06- 2017-07- 2017-09- Contratacao de servicos de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 28 17 15 pedreiros Initiatives SUB 45-9 / CT45.9 Contratacao de servico de Component 1: Sustainable moderacao e instrutoria Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para curso sobre Quotations Envelope 04 28 06 Initiatives planejamento participativo e gestao compartilhada SUB 45-12 / CT45.12 Contratacao de servico de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-11- moderacao e instrutoria TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 27 26 10 para uma oficina de gestao Initiatives financeira SUB 45-14 / CT45.14 Contratacao de servico de Component 1: Sustainable moderacao e instrutoria Request for Single Stage - One 2018-04- 2018-05- 2018-07- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para curso de prevencao de Quotations Envelope 22 28 12 Initiatives acidentes com animais peconhentos SUB 45-15 / CT45.15 Contratacao de servico de Component 1: Sustainable moderacao e instrutoria Request for Single Stage - One 2018-08- 2018-09- 2018-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para curso sobre manejo Quotations Envelope 13 17 01 Initiatives adequado e conservacao dos recursos naturais SUB 45-23 / CT45.23 Contratacao de um profissional tecnico com Component 1: Sustainable experiencia na area Request for Single Stage - One 2017-06- 2017-07- 2019-03- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled agropecuaria vivencia em Quotations Envelope 25 19 11 Initiatives trabalhos com grupos de mulheres e que vem atuando na area da agricultura famíliar SUB 45-13 / CT45.13 Contratacao de servico de Component 1: Sustainable moderacao e instrutoria Request for Single Stage - One 2018-02- 2018-03- 2018-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para curso sobre boas Quotations Envelope 10 13 27 Initiatives praticas na manipulacao do azeite de coco SUB 55-11 / 55.11 Contratacao de servicos de Component 1: Sustainable Pending Request for Single Stage - One 2019-03- 2019-03- 2019-06- impressão de rótulos e TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 22 30 aquisição de um Datador Initiatives ation Automático. SUB 211 SC 004 / Contratação de serviços de Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-10- 2019-03- 2019-10- 2019-04- pedreiro para construção, TF / 18765 and Adaptive Community Post Limited 1,689.50 Signed Quotations Envelope 23 03 13 11 13 instalação elétrica e Initiatives hidráulica da Casa de Cultura SUB 211 SC 005 / Contratação de serviços de Component 1: Sustainable mão-de-obra para estrutura Request for Single Stage - One 2019-02- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled em madeira e cobertura em Quotations Envelope 23 13 13 Initiatives palha e piaçava para construção da Casa de Cultura SUB 179 SC 004 / Component 1: Sustainable Under Contratação de serviços Request for Single Stage - One 2019-02- 2020-09- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 2,639.19 Implement para instalação do poço Quotations Envelope 23 17 13 13 Initiatives ation artesiano com placas de energia solar. BR-CAA-39559-NC-RFQ / Contratação de profissional para apoio junto as equipes de licitação e financeira das atividades físico-financeira Component 2: Capacity para implementação dos Request for Single Stage - One 2019-01- 2019-04- 2019-02- 2019-05- 2020-02- 2020-12- TF / 18765 Building and Institutional Post Limited 11,508.58 Completed cursos e Quotations Envelope 26 03 15 02 10 17 Strengthening Organização e acompanhamento logístico para implementação de cada curso, previstos no Plano de Capacitação. SUB 90-1 / CT90.1 Contratação de servicos de Component 1: Sustainable Pending rotulagem técnica Request for Single Stage - One 2017-07- 2017-07- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement obrigatória com Quotations Envelope 08 31 09 Initiatives ation levantamento e analise nutricional dos componentes dos produtos SUB 61-14 / CQ61.14 Contratação de serviço de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-10- instancio de dez TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 04 04 computadores adquiridos Initiatives para o tele centro SUB 61-19 / CQ61.19 Contratação de profissional técnico para realizar Component 1: Sustainable Request for Single Stage - One 2018-01- 2018-02- 2018-04- capacitação sobre a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 17 12 03 participação dos jovens na Initiatives produção de mídias em redes sociais SUB 109-2 / CT109.2 Contratação de serviços de agente de comercialização para garantir o acesso ao Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2018-11- mercado local com a TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 29 21 15 realização de levantamentos Initiatives acordos com mercados elaboração de projetos de venda e acompanhamento SUB 108- 29 / Contratação Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-11- 2019-03- 2019-11- 2020-08- 2020-06- de Empresa de Engenharia TF / 18765 and Adaptive Community Post Limited 11,649.37 Completed Quotations Envelope 04 11 20 26 01 23 para construção de Initiatives beneficiamento SUB 108-5 / Contratação Component 1: Sustainable de serviços para confecção Request for Single Stage - One 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de banners e folders para Quotations Envelope 12 29 29 Initiatives divulgação/informativo SUB 113-1 / Contratação Component 1: Sustainable de agente da comunidade 2017-09- 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled para Capacitação de grupos 01 22 24 26 Initiatives produtivos. SUB 113-3 / serviço de mobilização comunitária junto às famílias envolvidas no projeto para realizar a Component 1: Sustainable produção local e Request for Single Stage - One 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled identificação de mudas Quotations Envelope 08 25 24 Initiatives nativas a serem adquiridas para restauração de áreas degradadas, no âmbito das nascentes do córrego fazendinha. SUB 250-6 / Contratação Component 1: Sustainable Pending de serviços de impressão Request for Single Stage - One 2019-02- 2019-03- 2019-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement dos rótulos, livretos de Quotations Envelope 26 18 17 Initiatives ation receita e folders. SUB 113-7 / Contratação Component 1: Sustainable Under Request for Single Stage - One 2017-09- 2019-08- 2017-09- 2018-12- de serviços de locação de TF / 18765 and Adaptive Community Post Limited 857.28 Implement Quotations Envelope 12 30 29 24 veículo Initiatives ation Page 16 SUB 113- 25 / Contratação Component 1: Sustainable Pending de serviços de locação de Request for Single Stage - One 2019-03- 2019-03- 2020-06- TF / 18765 and Adaptive Community Post Limited 0.00 Implement transporte para eventos Quotations Envelope 17 28 20 Initiatives ation regionais ( 4.000,00). SUB 113- 26 / . Contratação de serviços de Component 1: Sustainable Pending Request for Single Stage - One 2019-03- 2019-03- 2020-06- locação de veículo durante 3 TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 28 20 meses para realização dos Initiatives ation trabalhos previstos (5.400,00). SUB 113-20 / SUB 113-20 Component 1: Sustainable Community serviço de apoio operacional 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- 2019-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled para execução das 15 22 05 12 19 25 Initiatives Development atividades subprojeto CTA. Component 1: Sustainable 71- 12 / Serviços de Arte Request for Single Stage - One 2019-03- 2019-09- 2019-03- 2019-09- 2019-04- 2020-03- TF / 18765 and Adaptive Community Post Limited 1,174.90 Completed Gráfico (Design) Quotations Envelope 08 18 23 27 22 19 Initiatives BR-CAA-103028-NC-RFQ / Serviços gráficos para Component 2: Capacity Request for Single Stage - One 2019-03- 2019-03- 2019-04- 2019-03- 2019-06- 2019-05- confecção dos materiais TF / 18765 Building and Institutional Post Limited 867.37 Completed Quotations Envelope 18 06 12 28 11 27 pedagógicos para as Strengthening oficinas do plano de capacitação SUB 124 - 3 / Contratação Component 1: Sustainable Community 2018-01- 2019-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- de serviços para confecção TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 22 11 05 12 14 20 23 de camisetas Initiatives Development personalizadas. SUB 124 - 2 / Serviço de movimento de terra com Component 1: Sustainable Community 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- trator ou terraplenagem TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 22 05 12 14 20 23 para viabilizar a construção Initiatives Development de barragens. SUB 91-1 / Serviço de mão Component 1: Sustainable Community de obra (civil, hidráulico e 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled elétrico) para montagem do 15 29 05 09 15 17 Initiatives Development sistema de bombeamento SUB 71-7 / CT71.7 Contratação de profissional para elaboração do Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2018-02- Regimento Interno das TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 23 17 24 Casas do Coco e elaboração Initiatives do manual de boas praticas para os produtos do coco SUB 71-3 / CT71.3 Contratação de profissional Component 1: Sustainable para estruturação do plano Request for Single Stage - One 2017-07- 2017-08- 2017-09- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled de negócios que contenha o Quotations Envelope 20 16 25 Initiatives desenvolvimento de logística de venda e distribuição BR-CAA-105071-NC-RFQ / Contratação de prestação de serviços de tradução de Component 3: Project textos (em português para o Request for Single Stage - One 2019-03- 2019-08- 2019-04- 2019-09- 2019-07- TF / 18765 Management, Monitoring Post Limited 2,061.90 Signed idioma inglês, e do inglês Quotations Envelope 20 09 08 06 07 and Evaluation para o idioma português) para produção de publicação do projeto DGM/FIP/Brasil SUB 210- 6 / Contratação de serviços para capacitação Component 1: Sustainable Request for Single Stage - One 2019-03- 2019-03- 2019-06- em construção de viveiro TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 17 25 23 para produção de mudas e Initiatives implantação dos quintais SUB 124 - 4 / Contratação Component 1: Sustainable Community de serviços de alimentação 2018-01- 2018-02- 2018-02- 2018-02- 2018-02- 2018-04- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled para participantes do dia de 26 09 19 20 26 30 Initiatives Development campo, durante curso de SAF. SUB 124 - 10 / Aluguel de implementos agrícolas (Aluguel de trator equipado com carreta para transporte, Component 1: Sustainable tanque de água com bomba, Request for Single Stage - One 2019-04- 2019-05- 2019-05- 2019-05- 2019-09- 2019-10- TF / 18765 and Adaptive Community Post Limited 7,273.25 Completed container d'água, susolador Quotations Envelope 22 02 11 15 08 15 Initiatives e esteira rotativa para preparo de linhas de plantio , plantio e irrigação - instalação dos SAFs) SUB 124 - 12 / Contratação de profissional em Educação Component 1: Sustainable Ambiental para condução de Request for Single Stage - One 2019-05- 2019-10- 2019-05- 2019-10- 2019-07- 2019-12- TF / 18765 and Adaptive Community Post Limited 1,946.50 Completed oficinas participativas para Quotations Envelope 07 16 30 25 29 06 Initiatives levantamento de dados com os atores do projeto. BR-CAA-110425-NC-RFQ / Contratação de serviço para fornecimento de alimentação (lanche, almoço e jantar) para 02 (duas) Component 2: Capacity Pending Request for Single Stage - One 2019-04- 2019-05- 2019-10- capacitações (Mudanças TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 29 16 13 climáticas e a política de Strengthening ation REDD+ E Agroindústria), para público de 75 participantes a serem realizados em Montes Claros/MG. SUB 124 - 13 / Contratação de profissional para Component 1: Sustainable Pending ministrar capacitação Request for Single Stage - One 2019-05- 2019-06- 2019-08- TF / 18765 and Adaptive Community Post Limited 0.00 Implement teórico/pratico sobre Quotations Envelope 10 04 03 Initiatives ation produtos e comercio de produtos obtidos através da mandioca. BR-CAA-110426-NC-DIR / Serviço do Facebook ADS para impulsionamento da Component 2: Capacity Pending 2019-04- 2019-04- 2019-05- 2020-04- página através das TF / 18765 Building and Institutional Post Direct Selection Direct 0.00 Implement 22 29 12 06 publicações, especificando o Strengthening ation público de interesse do projeto DGM e Subprojetos BR-CAA-110427-NC-DIR / Serviço Do Instagram ADS para impulsionamento da Component 2: Capacity Pending 2019-04- 2019-04- 2019-05- 2020-04- página e posts através do TF / 18765 Building and Institutional Post Direct Selection Direct 0.00 Implement 22 29 12 06 Instagram objetivando Strengthening ation atingir o público do projeto DGM e Subprojetos SUB 124 - 14 / Contratação Component 1: Sustainable Under Request for Single Stage - One 2019-05- 2020-02- 2019-06- 2019-08- de serviços de impressão de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 21 08 07 cartilhas Initiatives ation BR-CAA-110428-NC-DIR / Contratação de licença de uso da ferramenta de envio Component 2: Capacity de e-mail em massa, design 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2020-04- TF / 18765 Building and Institutional Post Direct Selection Direct 1,059.93 Signed de newsletter e mailing 22 22 29 13 12 13 06 Strengthening jornalístico objetivando atingir o público do projeto DGM e Subprojetos BR-CAA-110431-NC-RFQ / Contratação de serviços de hospedagem e translado Component 2: Capacity para participantes dos Request for Single Stage - One 2019-05- 2019-05- 2019-05- 2019-05- 2019-08- 2019-08- TF / 18765 Building and Institutional Post Limited 20,407.69 Completed módulos I e II do Curso de Quotations Envelope 09 23 24 31 22 15 Strengthening Sustentabilidade e Indidência política (30 participantes - Brasília, DF). BR-CAA-110432-NC-RFQ / Contratação de serviços de transporte para 35 pessoas, Component 2: Capacity Request for Single Stage - One 2019-06- 2019-07- 2019-06- 2019-07- 2019-07- 2019-07- para deslocamento dos TF / 18765 Building and Institutional Post Limited 149.90 Completed Quotations Envelope 03 10 28 23 28 29 participantes no Curso de Strengthening REDD - percurso Montes Claros a AEFA (local do curso). SUB 218 SC 004 / Contratação de serviços Component 1: Sustainable Request for Single Stage - One 2019-02- 2019-06- 2019-03- 2019-07- 2019-05- 2019-09- para produção de sacolas TF / 18765 and Adaptive Community Post Limited 1,465.27 Completed Quotations Envelope 19 28 10 29 09 20 de papel e caixas de Initiatives papelão personalizadas. SUB 241-3 / Contratação de horas-máquina para Component 1: Sustainable Pending Request for Single Stage - One 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-09- implantação de tecnologias TF / 18765 and Adaptive Community Post Limited 0.00 Implement Proposals Envelope 17 25 05 09 13 12 de barramento de água Initiatives ation (barraginha) SUB 216-2 / Serviços de impressão de documento Component 1: Sustainable Request for Single Stage - One 2019-06- 2019-07- 2019-10- base com os diagnósticos TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 26 19 18 para construção dos planos Initiatives de gestão territorial e ambiental SUB 179 SC 001 / Component 1: Sustainable Contratação de serviços Request for Single Stage - One 2019-02- 2019-03- 2019-04- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para: perfuração E Quotations Envelope 19 09 09 Initiatives revestimento de poço artesiano BR-CAA-105072-NC-RFQ / Contratação de serviços de Component 2: Capacity transporte para Request for Single Stage - One 2019-07- 2019-08- 2019-09- 2019-08- 2019-11- 2019-08- TF / 18765 Building and Institutional Post Limited 168.74 Completed deslocamento durante Quotations Envelope 31 08 25 16 19 30 Strengthening reunião dos membros do CGN em Montes Claros no mês de Agosto. BR-CAA-105074-NC-RFQ / Contratação de Component 2: Capacity Hospedagem para o Request for Single Stage - One 2019-08- 2019-09- 2019-08- 2019-09- 2019-09- 2019-10- TF / 18765 Building and Institutional Post Limited 2,984.86 Completed Colóquio Internacional de Quotations Envelope 14 10 31 19 30 21 Strengthening PICTs/ Oficina de Turismo de Base Comunitária em Montes Claros. BR-CAA-127223-NC-RFQ / Serviços de hospedagens e Component 2: Capacity transfer para os Request for Single Stage - One 2019-09- 2019-09- 2019-09- 2019-10- 2019-12- 2019-12- TF / 18765 Building and Institutional Post Limited 10,996.84 Completed participantes do 3º e 4º Quotations Envelope 04 20 11 01 11 20 Strengthening módulo do cursos de Sustentabilidade em  parceria com a Unb. BR-CAA-127227-NC-RFQ / Serviço de buffer/alimentação para os Component 2: Capacity Request for Single Stage - One 2019-09- 2019-09- 2019-09- 2019-10- 2019-12- 2019-12- cursos a serem realizadas TF / 18765 Building and Institutional Post Limited 15,380.55 Completed Quotations Envelope 04 20 11 01 10 06 na AEFA = Energia Strengthening fotovoltaica ( 30 participantes) + Produção Agroecológica (35 participantes) BR-CAA-105073-NC-RFQ / Contratação de profissional para apoio junto a equipe Component 3: Project financeira para lançamentos Request for Single Stage - One 2019-07- 2019-09- 2019-11- TF / 18765 Management, Monitoring Post Limited 0.00 Canceled e correções no sistema de Quotations Envelope 31 25 29 and Evaluation gestão, referente receitas e despesas dos anos 2015- 2018 BR-CAA-129374-NC-RFQ / Contratação de pessoa física para prestação de serviços de Contratação de pessoa Component 2: Capacity física para prestação de Request for Single Stage - One 2019-09- 2019-09- 2019-12- TF / 18765 Building and Institutional Post Limited 0.00 Canceled serviços de criação, Quotations Envelope 09 26 25 Strengthening concepção, produção musical, gravação, mixagem, masterização de trilha sonora vídeo musical do DGM/FIP/Brasil. BR-CAA-129375-NC-RFQ / Contratação de serviços especializados de fotografia em câmera profissional full frame, com Component 2: Capacity Request for Single Stage - One 2019-09- 2019-11- 2019-09- 2019-11- 2019-12- resolução acima de 22.3 TF / 18765 Building and Institutional Post Limited 1,434.60 Signed Quotations Envelope 09 07 26 27 25 megapixels, para produção Strengthening de acervo fotográfico do Projeto DGM FIP Brasil, para uso institucional do CAA, BM e Subprojetos. BR-CAA-133682-NC-RFQ / Contratação de serviços de transporte para deslocamento dos Component 2: Capacity Request for Single Stage - One 2019-09- 2019-11- 2019-10- 2019-11- 2019-10- 2020-04- participantes do Curso de TF / 18765 Building and Institutional Post Limited 1,234.67 Completed Quotations Envelope 23 11 09 14 18 01 Formação e Agroecologia Strengthening (Módulos I e II) e Capacitação em energia fotovoltaica, a ser realizados em Montes Claros - 2º semestre de 2019 Component 1: Sustainable SUB 218 -SC 008-2019 / Request for Single Stage - One 2019-08- 2019-10- 2019-10- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Cardagem algodão orgânico Quotations Envelope 27 14 15 Initiatives SUB 218 -CD 002.2019 / Component 1: Sustainable Under 2019-09- 2019-08- 2019-09- 2019-08- 2019-10- 2019-11- Cardagem do algodão TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Implement 23 28 26 28 02 02 orgânico Initiatives ation BR-CAA-110430-NC-RFQ / Serviço de comunicação com foco em ministrar oficinas quanto ao direito a Component 2: Capacity Request for Single Stage - One 2019-05- 2019-05- 2019-08- comunicação e a nova visão TF / 18765 Building and Institutional Post Limited 0.00 Canceled Quotations Envelope 06 23 21 de fotografar, filmar, Strengthening escrever, entrevistar e contar histórias visando a comunicação popular SUB 169-3 / Confecção de placa de inauguração do Component 1: Sustainable Request for Single Stage - One 2019-11- 2020-07- 2019-12- 2020-07- 2019-12- 2020-08- centro e placas TF / 18765 and Adaptive Community Post Limited 195.08 Completed Quotations Envelope 17 08 06 24 12 06 sinalizadores dos pontos Initiatives turísticos da região do Delta do Parnaíba. SUB 169-4 / Contratação de serviços gráficos: Component 1: Sustainable Pending sinalização dos pontos; Request for Single Stage - One 2019-11- 2019-12- 2020-02- TF / 18765 and Adaptive Community Post Limited 0.00 Implement produção de identidade; e Quotations Envelope 17 06 04 Initiatives ation impressão de cartazes da associações e do projeto. SUB 85 - 3 / Serviço de Component 1: Sustainable Community 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-05- mão de obra para TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 08 22 29 02 09 21 construção de cercas - Mão Initiatives Development Obra 1 SUB 85 - 4 / Serviço de Component 1: Sustainable Community 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-05- mão de obra para TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 08 22 29 02 09 21 construção de cercas - Mão Initiatives Development Obra 2. Component 1: Sustainable Community SUB 85 - 2 / Serviço de 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled locação de micro-ônibus. 26 09 16 18 27 28 Initiatives Development Component 1: Sustainable Community SUB 85 - 5 / Serviço de 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-06- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled aragem de terra com trator. 29 12 19 23 02 10 Initiatives Development SUB 85 - 6 / Serviço de Component 1: Sustainable Community 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- Instalação de sistema de TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 26 09 18 20 26 26 irrigação. Initiatives Development SUB 16-19 / Contratação de serviço de apoio Component 1: Sustainable Community 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- 2019-11- operacional de comunicação TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 15 20 30 02 06 27 para execução das Initiatives Development atividades subprojeto CEDRO. SUB 16-20 / Contratação de Agente Local para Component 1: Sustainable Community mobilização, 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-09- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled acompanhamento e apoio 25 30 09 11 21 14 Initiatives Development no planejamento das atividades do projeto. SUB 16-21 / Contratação de agente local para registros fotográficos e Component 1: Sustainable Community 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2019-09- organização das atividades TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled 09 14 24 26 06 29 previstas no projeto (como Initiatives Development oficinas, seminários, construção, cercamento das nascentes). SUB 16-4 / CQ16-4 Serviço Component 1: Sustainable Request for Single Stage - One 2017-07- 2017-08- 2019-01- de elaboração de vídeo TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 20 13 31 sobre as ações do projeto. Initiatives SUB 16-7 / CQ16-7 Serviço de preparo do solo para a Implantar uma Produção Component 1: Sustainable agroecológica Sustentável e 2017-08- 2017-08- 2017-09- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled dezesseis ortas famílias 10 20 13 13 Initiatives objetivando fortalecer a soberania e a segurança alimentar na comunidade SUB 16-9 / CQ16-9 Serviço de hora maquina para a Component 1: Sustainable Request for Single Stage - One 2017-09- 2017-10- 2017-12- construção de curvas de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 30 24 08 nível e bacias de contenção Initiatives de enxurrada SUB 3-20 / Contratação de serviços de máquina (trator) Component 1: Sustainable Pending com motorista para Request for Single Stage - One 2018-05- 2018-06- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement construção de barraginhas, Quotations Envelope 28 14 12 Initiatives ation para captação de água da chuva, na TI Maraiwatsede. Page 17 SUB 3-11 / Contratação de profissional para ministrar Oficina de práticas agroecológicas para Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-09- 2017-11- restauração do cerrado na TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 18 22 24 Aldeia A'opa com a Initiatives participação das aldeias Maraiwatsede, Etewawe e Madmabdze. SUB 3-14 / Contratação de Component 1: Sustainable serviços de pedreiro para Request for Single Stage - One 2017-09- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled construção de galpão em Quotations Envelope 29 06 05 Initiatives madeira e alvenaria - 100 dias SUB 3-19 / Contratação de serviços de tratoristas para Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-01- plantio de mudas e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 12 04 08 27 sementes no entorno das Initiatives aldeias Etewawê - Maraiwatsede SUB 3-21 / Contratação de serviços de operador de Component 1: Sustainable Pending Request for Single Stage - One 2019-10- 2019-11- 2020-01- máquina para oficina de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 18 05 04 capacitação de construção Initiatives ation de barraginhas. SUB 3-22 / Contratação de serviços de tratoristas para Component 1: Sustainable Pending plantio de mudas e Request for Single Stage - One 2019-10- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement sementes e plantio de 1000 Quotations Envelope 18 05 04 Initiatives ation mudas no entorno das aldeias Aopá - Madzabdze SUB 98 -2 / Serviço de Locação de uma Van para Component 1: Sustainable Community transportar representantes 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled indígenas, para a realização 15 29 05 09 15 17 Initiatives Development de um intercâmbio no municipio de Taquaral. SUB 98 -20 / Contratação de profissional técnico para Component 1: Sustainable Pending elaboração do projeto do Request for Single Stage - One 2019-10- 2019-11- 2019-12- TF / 18765 and Adaptive Community Post Limited 0.00 Implement viveiro para produção de Quotations Envelope 25 10 25 Initiatives ation 10.000 mudas/ano (nativas e frutíferas) AI - 3 / Serviço de confecção de kits Component 1: Sustainable Request for Single Stage - One 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- pedagógicos como TF / 18765 and Adaptive Community Post Limited 1,537.41 Completed Quotations Envelope 15 18 22 25 06 29 camisetas, bolsas e bloco de Initiatives anotações para utilização durante Assembleia AI - 4 / Serviços de fornecimento de refeição / Component 1: Sustainable Request for Single Stage - One 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- buffer para atividade de TF / 18765 and Adaptive Community Post Limited 6,662.11 Completed Quotations Envelope 14 18 21 22 05 04 assembleia da Wyty Cati Initiatives junto aos povos Timbiras SUB 127-16 / Servico de frete comunitario indigena Component 1: Sustainable para transporte de madeira Request for Single Stage - One 2017-12- 2017-12- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled e palhas que serao Quotations Envelope 12 26 25 Initiatives utilizadas na construcao do Centro de Revitalizacao - frete 2 SUB 30 - 1 / Serviço de Component 1: Sustainable Request for Single Stage - One 2017-12- 2017-12- 2018-12- confecção de Banners, TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 12 29 15 Folders para divulgação do Initiatives subprojeto SUB 30 - 10 / Serviço de Component 1: Sustainable mão de obra para retirada 2017-09- 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled da madeira para Construção 22 06 23 23 Initiatives do viveiro. SUB 30 - 3 / Serviço de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-10- 2017-11- moderador para o encontro TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 09 25 25 de mulheres Initiatives SUB 30 - 5 / Serviço de Component 1: Sustainable cozinheira para Capacitação 2017-09- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled na área de elaboração de 27 11 31 30 Initiatives projetos. SUB 30 - 6 / Serviço de Component 1: Sustainable cozinheira para Capacitação 2017-09- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled na área de gestão 27 11 28 27 Initiatives administrativa e financeira. SUB 30 - 7 / Serviço de cozinheira para Encontro de Component 1: Sustainable mulheres indígenas bakairi 2017-09- 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled para discussão da gestão 20 04 21 21 Initiatives ambiental e territorial do povo bakairi realizado. SUB 30 - 8 / Serviço de Component 1: Sustainable mão de obra (civil, 2017-09- 2017-10- 2017-11- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled hidráulico e elétrico) para a 25 09 25 25 Initiatives construção do viveiro. SUB 30 - 9 / Serviço de Component 1: Sustainable mão de obra para retirada 2017-09- 2017-10- 2017-10- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled da madeira para Construção 22 06 23 23 Initiatives do escritório do projeto. SUB 30 -4 / Serviço de Component 1: Sustainable cozinheira para Capacitação 2017-09- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled em gestão e legislação 27 11 28 27 Initiatives ambiental para 40 pessoas. SUB 139-1 / Confecção de Component 1: Sustainable Pending banners e impressão de Request for Single Stage - One 2019-11- 2019-11- 2020-01- TF / 18765 and Adaptive Community Post Limited 0.00 Implement cartilhas para divulgar Quotations Envelope 15 25 24 Initiatives ation atividades e ações do projeto SUB 218 - 9 / Contratação Component 1: Sustainable de serviços para produção Request for Single Stage - One 2019-11- 2019-11- 2019-11- 2019-11- 2020-01- 2019-11- TF / 18765 and Adaptive Community Post Limited 140.74 Completed de folders, banners Quotations Envelope 08 18 21 23 20 29 Initiatives personalizadas. SUB 74-76 / SUB 74-76 Component 1: Sustainable Community Serviço de apoio operacional 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Driven Limited 0.00 Canceled para execução das 11 19 26 29 02 24 Initiatives Development atividades subprojeto Wyty Cati. SUB 74-30 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 14 SUB 74-31 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 15 SUB 74-32 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 16 SUB 74-33 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 17 SUB 74-34 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 18 SUB 74-35 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 19 SUB 74-36 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 20 SUB 74-37 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 21 SUB 74-38 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 22 SUB 74-39 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 23 SUB 74-40 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 24 SUB 74-41 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 25 SUB 74-42 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 26 SUB 74-43 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 27 SUB 74-1 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 28 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 1 SUB 74-10 / Contratação Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-10- de serviços de impressão de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 18 18 cartazes e panfletos Initiatives SUB 74-16 / Contratação Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-09- de serviço de confecção de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 22 21 blusas com logo Initiatives SUB 74-18 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 2 SUB 74-19 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 3 SUB 74-2 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 27 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 01 SUB 74-20 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 4 SUB 74-21 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 5 SUB 74-22 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 6 SUB 74-23 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 7 SUB 74-24 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 8 SUB 74-25 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 9 SUB 74-26 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 10 SUB 74-27 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 11 SUB 74-28 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 12 Page 18 SUB 74-29 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-09- 2017-10- 2017-11- 2018-05- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 16 25 fiscalização ambiental para Initiatives realizar expedições na TI Kanela - Agente Nº 13 SUB 74-47 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 02 SUB 74-48 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 03 SUB 74-49 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 04 SUB 74-5 / Contratação de Component 1: Sustainable indígena facilitador na 2017-07- 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled Oficina de Monitoramento e 25 02 16 16 Initiatives fiscalização do território SUB 74-50 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-02- 2018-08- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 04 13 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 05 SUB 74-51 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 06 SUB 74-52 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 07 SUB 74-53 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 08 SUB 74-54 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 09 SUB 74-55 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 10 SUB 74-56 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 11 SUB 74-57 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 12 SUB 74-58 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 13 SUB 74-59 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 14 SUB 74-6 / Contratação de Component 1: Sustainable indígena facilitador na 2017-09- 2017-09- 2017-09- 2017-11- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled Oficina de Monitoramento e 01 09 23 23 Initiatives fiscalização do território SUB 74-60 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 15 SUB 74-61 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 16 SUB 74-62 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 17 SUB 74-63 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 18 SUB 74-64 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 19 SUB 74-65 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 20 SUB 74-66 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 21 SUB 74-67 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 22 SUB 74-68 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 23 SUB 74-69 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 24 Component 1: Sustainable SUB 74-7 / Contratação de 2017-07- 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled cozinheiro (a) 25 02 16 16 Initiatives SUB 74-70 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 25 SUB 74-71 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-11- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 25 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 26 SUB 74-72 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 27 SUB 74-73 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 28 SUB 74-74 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 29 SUB 74-75 / Contratação, via diária, de agentes indígenas capacitados em Component 1: Sustainable 2017-11- 2017-12- 2018-01- 2018-07- monitoramento e TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled 20 12 17 26 fiscalização ambiental para Initiatives realizar expedições na TI Porquinhos - Agente N.º 30 Component 1: Sustainable SUB 74-8 / Contratação de 2017-07- 2017-08- 2017-08- 2017-10- TF / 18765 and Adaptive Community Post Direct Selection Direct 0.00 Canceled cozinheiro (a) 25 02 16 16 Initiatives SUB 74-9 / Contratação de Component 1: Sustainable Request for Single Stage - One 2017-08- 2017-08- 2017-10- serviço de fornecimento de TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 02 16 16 combustível Initiatives SUB 47-1 / Contratação de Component 1: Sustainable mão-de-obra de pedreiro Request for Single Stage - One 2017-10- 2017-11- 2018-06- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled para reforma da unidade de Quotations Envelope 04 13 01 Initiatives beneficiamento de polpas. SUB 47-2 / Contratação de mão-de-obra de auxiliar de Component 1: Sustainable Request for Single Stage - One 2017-10- 2017-11- 2018-06- pedreiro para reforma da TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 04 13 01 unidade de beneficiamento Initiatives de polpas. SUB 173 - 14 / Contratação de serviços de ajudante de Component 1: Sustainable Pending Request for Single Stage - One 2019-11- 2019-12- 2020-02- pedreiro para etapa de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 23 05 03 finalização da cozinha Initiatives ation comunitária SUB 173 - 15 / Aluguel de Component 1: Sustainable ônibus para transporte dos Request for Single Stage - One 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- TF / 18765 and Adaptive Community Post Limited 835.73 Signed participantes do Quotations Envelope 08 06 20 11 20 Initiatives intercâmbio e seminário SUB 74-77 / Contratação Component 1: Sustainable serviços de locação de Request for Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- TF / 18765 and Adaptive Community Post Limited 763.30 Signed veículo Modelo 4x4 para Quotations Envelope 22 29 03 09 02 Initiatives expedição na TI Porquinhos. SUB 71-2 / Contratação de Component 1: Sustainable Request for Single Stage - One 2019-11- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- servicos gráficos de TF / 18765 and Adaptive Community Post Limited 617.02 Completed Quotations Envelope 24 04 14 11 13 20 materiais de divulgação Initiatives (placas e faixas) SUB 181-3 / Contratação de aluguel de ônibus para Component 1: Sustainable Pending Request for Single Stage - One 2019-12- 2019-12- 2020-02- viagem de intercâmbio - TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 11 28 26 Visitas às comunidades Initiatives ation Guarani do Paraguai SUB 105-2 / Serviços de impressão gráfica para Component 1: Sustainable produzir o caderno de Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-04- TF / 18765 and Adaptive Community Post Limited 3,527.07 Completed planos de gestão e práticas Quotations Envelope 17 18 06 14 03 09 Initiatives de produção tradicionais quilombolas personalizadas SUB 105 -20 / Serviços de Diagramação/produção de arte para produzir o Component 1: Sustainable Under Request for Single Stage - One 2019-12- 2019-12- 2020-01- 2020-02- caderno de planos de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 19 18 15 29 gestão e práticas de Initiatives ation produção tradicionais quilombolas e para confecção de camisetas personalizadas SUB 105 -21 / Serviços Component 1: Sustainable Request for Single Stage - One 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- Técnicos em Cartografia/ TF / 18765 and Adaptive Community Post Limited 2,562.64 Signed Quotations Envelope 15 19 04 12 03 Mapeamento Initiatives SUB 26-20 / Impressão de Component 1: Sustainable 1000 cadernos, com Request for Single Stage - One 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- TF / 18765 and Adaptive Community Post Limited 926.23 Completed informativos dos resultados Quotations Envelope 20 03 02 11 01 19 Initiatives do projeto Component 1: Sustainable SUB 120.17 / Serviços Request for Single Stage - One 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-05- TF / 18765 and Adaptive Community Post Limited 1,711.62 Completed gráficos Quotations Envelope 27 06 30 17 19 27 Initiatives AI2-6 / Serviços de Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-02- 2020-04- Impressão de materiais TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 25 06 06 informativos para o projeto Initiatives ation AI2-7 / Serviços de Component 1: Sustainable impressão de material para Request for Single Stage - One 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2020-02- TF / 18765 and Adaptive Community Post Limited 178.47 Completed ser distribuído no seminário Quotations Envelope 09 20 23 22 23 10 Initiatives da APOINME AI2-8 / Serviços de tratorista para realização de Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-02- 2020-02- marcação de curvas de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 17 05 11 níveis e terracemanento nas Initiatives ation áreas de erosão AI2-10 / Confecção de Component 1: Sustainable Under Request for Single Stage - One 2020-01- 2020-03- 2020-01- 2020-02- camisetas personalizadas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 10 26 25 para Conselho Terena Initiatives ation AI2-11 / Locação de ônibus Component 1: Sustainable Pending Request for Single Stage - One 2020-01- 2020-01- 2020-02- para assembleia do povo TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 26 25 terena Initiatives ation Page 19 AI3 - 8 / Serviço de pessoa Component 1: Sustainable jurídica para construção e Request for Single Stage - One 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- TF / 18765 and Adaptive Community Post Limited 1,197.60 Signed desenvolvimento de novo Quotations Envelope 30 31 13 17 14 Initiatives layout do site do MIQCB BR-CAA-156149-NC-RFQ / Contratação de traslado - MOCxAEFAxMOC para os participantes dos cursos de Component 2: Capacity Pending Request for Single Stage - One 2020-02- 2020-02- 2020-05- Plantas Medicianais ( 30 TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 04 16 16 participantes) + Strengthening ation Empoderamento Feminino e Incidência Política (30 participantes - 2 módulos) BR-CAA-156150-NC-RFQ / Serviço de buffer/alimentação para os Component 2: Capacity Pending cursos a serem realizadas Request for Single Stage - One 2020-02- 2020-02- 2020-05- TF / 18765 Building and Institutional Post Limited 0.00 Implement na AEFA = Plantas Quotations Envelope 04 16 16 Strengthening ation Medicianais ( 30 participantes) + Empoderamento Feminino e Incidência Política (30 participantes - 2 módulos) SUB 268 - 10 / Contratação de serviços de filmagens Component 1: Sustainable Pending Request for Single Stage - One 2020-05- 2020-06- 2020-07- para elaboração de 3 curtas TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 28 15 15 sobre a produção de Initiatives ation artesanato dos Myky SUB 16 - 25 / Serviços de Component 1: Sustainable Pending Request for Single Stage - One 2020-05- 2020-06- 2020-07- mão de obra para instalação TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 30 13 13 de postes elétricos Initiatives ation SUB 100 - 21 / Contratação Component 1: Sustainable Pending de serviços de ilustração e Request for 2020-05- 2020-06- 2020-07- TF / 18765 and Adaptive Community Post 0.00 Implement diagramação para material Quotations 28 11 11 Initiatives ation gráfico SUB 100 - 22 / Contração Component 1: Sustainable Pending Request for Single Stage - One 2020-06- 2020-06- 2020-07- de serviços de gráfica para TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 01 15 15 impressão de cartilhas Initiatives ation BR-CAA-110429-NC-DIR / Contratação de licenças de pacote de programas, Component 2: Capacity Under ADOBE, de edição de 2020-06- 2020-08- 2020-06- 2020-08- 2020-06- 2020-12- TF / 18765 Building and Institutional Post Direct Selection Direct 2,123.80 Implement imagem, vídeo, áudio, 01 13 08 13 14 11 Strengthening ation arquivos PDF, de diagramação, entre outros, objetivando atingir o público do projeto DGM e Subprojetos AI3-6 / Aquisição de um Component 1: Sustainable Request for Single Stage - One 2020-06- 2020-06- 2020-08- 2020-07- 2020-10- 2020-07- sistema pronto para gestão TF / 18765 and Adaptive Community Post Limited 3,250.11 Completed Quotations Envelope 19 30 14 07 13 09 financeira do MIQCB. Initiatives Component 1: Sustainable Pending SUB 211 - 10 / Contratação Request for Single Stage - One 2020-07- 2020-07- 2020-07- TF / 18765 and Adaptive Community Post Limited 0.00 Implement de serviços de internet rural Quotations Envelope 03 28 31 Initiatives ation SUB 99-17 / Contratação Component 1: Sustainable Pending de serviço de limpeza e Request for Single Stage - One 2018-07- 2018-07- 2018-09- TF / 18765 and Adaptive Community Post Limited 0.00 Implement revestimento de poço Quotations Envelope 05 22 20 Initiatives ation artesiano. BR-CAA-181729-NC-RFQ / Component 2: Capacity Pending Request for Single Stage - One 2020-07- 2020-08- 2020-09- Contratação de serviço de TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 15 31 30 impressão para guia de Strengthening ation povos SUB 16 - 26 / Serviços de Component 1: Sustainable 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- mão de obra para instalação TF / 18765 and Adaptive Community Post Direct Selection Direct 1,288.06 Completed 17 24 22 29 28 28 27 19 de postes elétricos Initiatives AI2- 17 / Contratação de Component 1: Sustainable Request for Single Stage - One 2020-08- 2020-08- 2020-09- serviço para instalação do TF / 18765 and Adaptive Community Post Limited 0.00 Canceled Quotations Envelope 08 23 22 sistema de irrigação Initiatives SUB 90 - 6 / Criação de identidade visual e Component 1: Sustainable Pending Request for Single Stage - One 2020-08- 2020-08- 2020-10- confecção e impressão de TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 09 23 22 rotulagem dos produtos da Initiatives ation Central do Cerrado BR-CAA-189883-NC-RFQ / Contratação de serviços de Component 2: Capacity Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- diagramação de Cartilha TF / 18765 Building and Institutional Post Limited 0.00 Implement Quotations Envelope 04 19 18 sobre Formação de Strengthening ation Lideranças para mulheres SUB 99 - 21 / Contratação Component 1: Sustainable Request for Single Stage - One 2020-09- 2020-10- 2020-10- 2020-10- 2020-12- de serviços para perfuração TF / 18765 and Adaptive Community Post Limited 8,221.77 Signed Quotations Envelope 13 13 02 21 01 de poço artesiano Initiatives SUB 250-10 / Aquisição de um sistema pronto para Component 1: Sustainable Pending Request for Single Stage - One 2020-10- 2020-11- 2021-01- gestão TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 15 09 08 administrativa/financeira da Initiatives ation CIMQCB. BR-CAA-198604-NC-DIR / Component 2: Capacity Pending Contratação de Serviços do 2020-10- 2020-10- 2020-10- 2021-06- TF / 18765 Building and Institutional Post Direct Selection Direct 0.00 Implement Google WorkSpace 07 10 14 11 Strengthening ation Enterprise Plus SUB 25-10 N / Serviço de Component 1: Sustainable Request for Single Stage - One 2020-11- 2020-12- 2020-12- 2020-12- 2021-01- 2020-12- diagramação e impressão de TF / 18765 and Adaptive Community Post Limited 790.60 Completed Quotations Envelope 26 01 08 08 07 30 cartilhas Initiatives BR-CAA-156155-NC-RFQ / Contratacao de empresa especializada em servicos de agenciamento de viagens Component 1: Sustainable Pending Request for Single Stage - One 2020-02- 2020-03- 2020-11- e fornecimento de TF / 18765 and Adaptive Community Post Open - National 0.00 Implement Quotations Envelope 07 08 13 passagens aereas regionais Initiatives ation nacionais e internacionais e passagens terrestres para realizacao das atividades DGM Brasil SUB 109 - 17 / Aquisição Component 1: Sustainable de moinho industrial para 2021-01- 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-05- TF / 18765 and Adaptive Community Post Direct Selection Direct 8,868.71 Signed unidade de beneficiamento 12 21 17 25 26 19 26 Initiatives do projeto SUB 26-18 / CT26.18 Contratacao de um profissional tecnico para Component 1: Sustainable realizar uma oficina de Request for Single Stage - One 2017-10- 2017-11- 2018-01- TF / 18765 and Adaptive Community Post Limited 0.00 Canceled dezesseis horas sobre Quotations Envelope 11 15 14 Initiatives aprendizados conhecimentos e uso das ervas medicinais do cerrado BR-CAA-231407-NC-RFQ / Contratação de Serviço de Component 3: Project Pending Diagramação do livro sobre Request for Single Stage - One 2021-05- 2021-05- 2021-07- TF / 18765 Management, Monitoring Post Limited 0.00 Implement o Plano de Capacitação para Quotations Envelope 01 27 26 and Evaluation ation os subprojetos do Mecanismo de Doação Dedicado BR-CAA-231409-NC-RFQ / Contratação de Serviços Component 3: Project Pending para Ilustração do livro Request for Single Stage - One 2021-05- 2021-05- 2021-07- TF / 18765 Management, Monitoring Post Limited 0.00 Implement sobre o Plano de Quotations Envelope 01 27 26 and Evaluation ation Capacitação para os subprojetos do Mecanismo de Doação Dedicado SUB 241 - 9 / Aquisição de material pedagógico para Component 1: Sustainable Pending Request for Single Stage - One 2021-06- 2021-07- 2021-08- realização de atividades TF / 18765 and Adaptive Community Post Limited 0.00 Implement Quotations Envelope 22 12 09 previstas no plano de Initiatives ation gestão do território CONSULTING FIRMS Activity Reference No. Short List and Draft Opening of Combined Loan / Credit Market Contract Type Actual Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual BR-CAA-184206-CS-CQS / Contratação de empresa especializada para Component 2: Capacity Consultant realização de formação em Pending 2020-07- 2020-08- 2020-08- 2020-10- TF / 18765 Building and Institutional Post Qualification Open - National 0.00 viabilidade econômica, Implementation 19 04 10 09 Strengthening Selection gestão democrática e inserção no mercado, para projetos apoiados pelo DGM/FIP/Brasil. BR-CAA-197005-CS-QBS / Consultoria empresarial para prover orientações Component 2: Capacity Consultant técnicas e assessoria na Under 2020-10- 2020-10- 2020-10- 2021-01- 2020-12- 2020-12- 2020-12- 2021-03- TF / 18765 Building and Institutional Post Qualification Open - National 0.00 regularização fiscal, jurídica Implementation 01 05 22 08 05 15 25 25 Strengthening Selection e contábil das organizações proponentes dos subprojetos e beneficiárias do DGM. INDIVIDUAL CONSULTANTS Activity Reference No. Invitation to Loan / Credit Market Actual Process Draft Negotiated Contract / Description Component Review Type Method Contract Type Teams of Reference Identified/Selected Signed Contract No. Approach Amount (US$) Status Contract Completion Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-CAA-3212-CS-INDV / contratacao de consultoria Component 1: Sustainable Individual Pending 2016-09- 2016-11- 2016-11- 2016-11- 2017-05- individual para realizar duas TF / 18765 and Adaptive Community Post Consultant Open 0.00 Implementation 09 04 08 16 15 oficinas anuais elaboracao Initiatives Selection de projetos BR-CAA-3248-CS-INDV / contratacao de consultoria individual para realizar segundo seminario tematico Component 2: Capacity Individual 2017-02- 2017-03- 2017-04- 2017-05- 2017-07- anual de sustentabilidade TF / 18765 Building and Institutional Post Consultant Open 0.00 Canceled 06 22 12 02 01 socioambiental situando o Strengthening Selection projeto na politica global sobre mudancas climaticas e seus componentes BR-CAA-3254-CS-INDV / Contratacao de consultoria individual para realizar Component 2: Capacity Individual terceiro seminario tematico Pending 2018-02- 2018-03- 2018-04- 2018-04- 2018-07- TF / 18765 Building and Institutional Post Consultant Open 0.00 anual de politicas publicas e Implementation 01 30 02 04 03 Strengthening Selection programas e acoes governamentais relacionados aos objetivos do projeto BR-CAA-17586-CS-INDV / Contratacao de consultoria Component 2: Capacity Individual individual para realizar Pending 2017-06- 2017-08- 2017-08- 2017-09- 2018-02- TF / 18765 Building and Institutional Post Consultant Open 0.00 primeiro Implementation 14 02 23 27 24 Strengthening Selection seminario tematico anual e oficina sobre REDD SUB 55-14 / CT55.14 Contratacao de consultoria tecnica especializada na Component 1: Sustainable Individual 2017-07- 2018-04- 2017-07- 2018-05- 2017-07- 2018-05- 2017-07- 2018-05- 2017-09- area de engenharia de TF / 18765 and Adaptive Community Post Consultant Limited 2,579.38 Signed 07 02 12 21 22 29 31 31 29 alimentos com experiencia Initiatives Selection em agroindustria familiar e comunitaria SUB 55-15 / CT55.15 Contratacao de profissional para realizar estudo ecologico da cagaita e do Component 1: Sustainable Individual araticum realizando o 2017-07- 2017-12- 2017-07- 2018-03- 2017-07- 2018-04- 2017-08- 2018-04- 2017-09- 2018-12- TF / 18765 and Adaptive Community Post Consultant Limited 2,636.75 Completed inventario e pesquisa 05 20 10 28 25 05 01 10 30 10 Initiatives Selection ecologica para avaliacao da densidade e produtividade de cagaita e araticum no territorio quilombola SUB 55-16 / CT55.16 Contratacao de profissional com experiencia em Component 1: Sustainable Individual Pending 2017-07- 2017-07- 2017-07- 2017-08- 2017-09- producao de mudas de TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 07 12 28 04 13 pequi para realizar Oficina Initiatives Selection de Capaciracao em producao de mudas de pequi SUB 56-18 / CT56.18 Contratacao de consultoria Component 1: Sustainable Individual 2017-07- 2017-07- 2017-08- 2018-01- 2017-08- 2017-08- 2017-08- 2018-01- 2019-06- 2018-03- tecnica especializada em TF / 18765 and Adaptive Community Post Consultant Limited 18,828.57 Completed 12 10 01 09 06 10 17 22 08 28 recuperacao de nascentes e Initiatives Selection microbacias na regiao SUB 75-3 / CQ75.3 Contratação de consultoria Component 1: Sustainable Individual para realizar diagnostico Pending 2017-07- 2017-07- 2017-07- 2017-08- 2017-11- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 com objetivo a elaboração Implementation 05 15 30 17 15 Initiatives Selection de plano de desenvolvimento de turismo sustentável SUB 75-4 / CQ75.4 Contratação de profissional para realizar diagnostico ambiental com objetivo a Component 1: Sustainable Individual Pending 2017-07- 2017-07- 2017-08- 2017-08- 2017-11- elaboração de dois planos TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 10 20 10 17 15 de gestão ambiental e dois Initiatives Selection projetos arquitetônicos com memorial descritivo e orçamento SUB 90-6 / CT90.6 Contratação de consultoria Component 1: Sustainable Individual 2017-07- 2017-07- 2017-08- 2017-08- 2017-11- para a formação em Gestão TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 11 21 05 14 12 de Operações de Remessa e Initiatives Selection Transporte de produtos SUB 109-13 / CT109.13 Contratação de consultoria especializado na área de Component 1: Sustainable Individual administração gestão de Pending 2017-08- 2017-09- 2017-09- 2017-10- 2018-07- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 associação comunitária e Implementation 15 02 22 02 09 Initiatives Selection comercialização para elaborar plano de comercialização dos produtos do babaçu SUB 28-1 / Contratação de Component 1: Sustainable Individual serviços de assessoria Pending 2017-09- 2017-09- 2017-09- 2017-10- 2019-02- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 técnica para Implementation 15 20 25 14 26 Initiatives Selection acompanhamento das atividades do projeto SUB 113-19 / Contratação de consultoria para Component 1: Sustainable Individual realização de estudo Pending 2017-09- 2017-10- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 etnográfico, com ênfase nos Implementation 15 05 16 27 25 Initiatives Selection recursos hídricos da Terra Indígena Portal do Encantado. SUB 120-14 / Contratação de profissional para Component 1: Sustainable Individual realização de estudo Under 2018-01- 2018-02- 2018-03- 2018-04- 2018-07- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 antropológico para Implementation 25 24 26 12 11 Initiatives Selection compreensão da visão econômica e gênero nos grupos de coletores do tix. SUB 127-32 / Consultoria individual para elaboracao Component 1: Sustainable Individual Pending 2017-11- 2017-12- 2017-12- 2018-01- 2018-02- de planta baixa do Centro TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 22 05 15 03 12 de Revitalizacao da cultura e Initiatives Selection visitacao AI1 - 7 / Consultoria técnica para elaboração da propostas metodológica e conteúdo programático da Component 1: Sustainable Individual Pending 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- reunião. Moderação da TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 06 26 05 19 20 reunião, sistematização da Initiatives Selection relatoria e elaboração de relatórios técnico e interlocução com os articuladores indígenas. SUB 25-17 / CQ25.17 Component 1: Sustainable Individual 2017-06- 2017-07- 2017-07- 2017-07- 2019-03- Contratação de assessoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 19 05 15 31 23 técnica para execução Initiatives Selection projeto SUB 74-11 / Contratação de profissional técnico Component 1: Sustainable Individual 2017-09- 2017-09- 2017-09- 2017-10- 2018-09- especializada para TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 13 18 23 10 15 assessoria e Initiatives Selection acompanhamento das atividades do projeto. SUB 108-4 / Contratação Component 1: Sustainable Individual 2017-09- 2017-09- 2017-09- 2017-10- 2019-03- de serviços de assessoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 08 13 23 04 08 para execução do projeto Initiatives Selection SUB 113-4 / Contratação Component 1: Sustainable Individual de serviços de assessoria 2017-09- 2017-09- 2017-09- 2017-10- 2018-12- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled técnica especializada na 08 13 21 20 24 Initiatives Selection execução do projeto Component 1: Sustainable Individual SUB 30 - 33 / Contratação 2017-09- 2017-09- 2017-10- 2017-10- 2019-02- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled de assessoria técnica. 10 30 10 24 06 Initiatives Selection SUB 88-8 / Consultoria individual para desenvolvimento de laudo Component 1: Sustainable Individual antropológico para a Under 2018-01- 2018-02- 2018-02- 2018-03- 2018-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 consecução dos objetivos Implementation 24 14 23 09 25 Initiatives Selection do Projeto destacando os potenciais e as vulnerabilidades do território. Page 20 CT26-18 / Contratacao de um profissional para Component 1: Sustainable Individual realizar uma avaliacao Pending 2018-01- 2018-02- 2018-02- 2018-02- 2019-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 tecnica e dar Implementation 18 07 12 26 19 Initiatives Selection recomendacoes sobre a recuperacao de duas areas que acessavam agua SUB 88 - 9 / Consultoria individual para desenvolvimento de um diagnóstico socioambiental Component 1: Sustainable Individual por meio da produção de Under 2018-01- 2018-02- 2018-02- 2018-03- 2018-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 laudo ambiental para a Implementation 24 13 23 09 25 Initiatives Selection consecução dos objetivos do projeto destacando os potenciais e as vulnerabilidades do território SUB 135-22 / Contratação Component 1: Sustainable Individual 2017-09- 2017-09- 2017-09- 2017-10- 2018-01- de profissional TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 15 20 27 07 05 especializado em bio Initiatives Selection construção SUB 26-19 / Contratacao Component 1: Sustainable Individual de consultoria para fazer o 2018-01- 2019-08- 2018-02- 2019-09- 2018-02- 2019-10- 2018-02- 2019-11- 2018-05- 2020-02- TF / 18765 and Adaptive Community Post Consultant Limited 2,330.55 Completed mapeamento da morraria 18 19 07 05 12 18 26 01 27 28 Initiatives Selection mapa etnoambiental SUB 108-2 / Contratação de prestação de serviços Component 1: Sustainable Individual especializado para 2017-09- 2017-10- 2017-10- 2017-10- 2018-01- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled realização de capacitação 15 05 16 30 28 Initiatives Selection em boas práticas para produção de alimentos. SUB 108-3 / Contratação de prestação de serviços Component 1: Sustainable Individual 2017-09- 2017-10- 2017-10- 2017-11- 2018-02- especializado para TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 25 13 25 08 06 realização de capacitação Initiatives Selection em gestão da unidade de beneficiamento. SUB 113-9 / Contratação Component 1: Sustainable Individual 2017-09- 2017-09- 2017-10- 2017-10- 2018-01- de instrutor para realização TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 11 16 07 23 11 de oficina de apicultura. Initiatives Selection AI1 - 6 / Consultoria para suporte no planejamento, proposta metodológica e conteúdo programático, Component 1: Sustainable Individual com foco nos aspectos Pending 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 jurídicos, preparação dos Implementation 06 26 05 19 20 Initiatives Selection materiais de apoio, elaboração de relatório sobre processo de constituição de personalidade jurídica SUB 26-15 / CT26.15 Component 1: Sustainable Individual 2017-06- 2017-06- 2017-07- 2017-08- 2017-11- Contratacao de consultoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 19 24 15 03 01 para assessoria tecnica Initiatives Selection SUB 16-12 / CQ16-12 Component 1: Sustainable Individual 2017-06- 2017-07- 2017-07- 2017-08- 2019-03- Contratação de assessoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 19 09 19 02 25 técnica especializada. Initiatives Selection SUB 16-13 / CQ16-13 Component 1: Sustainable Individual 2017-06- 2017-07- 2017-07- 2017-08- 2019-03- Contratação de assessoria TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 19 09 19 02 25 técnica em comunicao Initiatives Selection SUB 100 - 9 / Consultoria Component 1: Sustainable Individual individual para implantação 2017-12- 2018-01- 2018-01- 2018-02- 2018-03- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled de modelos de sistemas 20 09 19 02 14 Initiatives Selection agroflorestais. SUB 135-6 / Contratação Component 1: Sustainable Individual de assessoria para 2017-09- 2017-09- 2017-10- 2017-10- 2019-07- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled acompanhamento e das 25 30 07 17 29 Initiatives Selection ações do projeto SUB 123-14 / Contratação de consultoria para Component 1: Sustainable Individual Under 2018-04- 2019-11- 2018-05- 2018-05- 2018-06- 2018-12- construção coletiva de TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 27 07 02 29 06 03 estratégias de Initiatives Selection comercialização para o artesanato Karajá SUB 123-13 / Contratação consultoria para desenvolvimento da identidade visual da Component 1: Sustainable Individual associação. Produtos: 2018-04- 2018-05- 2018-05- 2018-06- 2020-01- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled marca, blog/site, catalogo 27 04 25 04 25 Initiatives Selection virtual, embalagens, rótulos, etiquetas, redes sociais, etc...) e acompanhamento técnico projeto. SUB 109-15 / Contratação de profissional para elaboração da planta e Component 1: Sustainable Individual memorial descritivo da Under 2018-06- 2019-08- 2018-06- 2018-06- 2018-07- 2018-09- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 reforma da agroindústria, Implementation 10 08 20 25 05 03 Initiatives Selection de acordo com a legislação vigente e realização de curso de boas práticas de produção. 122-13 / Contratação de consultor individual em geoprocessamento para Component 1: Sustainable Individual elaboracao de etno mapas, Pending 2018-09- 2018-09- 2018-09- 2018-10- 2019-04- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 de localização, Implementation 06 11 26 06 04 Initiatives Selection espacializacaoo de nascentes, mapas históricos, relevo e hidrografico. 125-14 / Contratacao de Component 1: Sustainable Individual consultoria individual para Under 2018-09- 2019-05- 2018-09- 2018-09- 2018-10- 2019-04- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 elaboracao de plano de Implementation 06 08 16 26 13 11 Initiatives Selection gestao ambiental e territorial SUB 143 - 12 / Contratação Component 1: Sustainable Individual de consultoria individual Under 2019-01- 2019-04- 2019-01- 2019-01- 2019-01- 2019-07- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 para elaboração de plano de Implementation 07 02 12 15 25 24 Initiatives Selection gestão ambiental e territorial. SUB 26 -16 / Contratação de uma consultoria técnica especializada para realizar Component 1: Sustainable Individual 2019-02- 2019-07- 2019-02- 2019-03- 2019-02- 2019-09- 2019-02- 2019-10- 2019-08- 2020-04- uma avaliação técnica e dar TF / 18765 and Adaptive Community Post Consultant Limited 1,750.36 Completed 06 19 12 08 18 07 27 09 26 30 recomendações sobre a Initiatives Selection recuperação de duas áreas que corriam água antes. BR-CAA-102339-CS-CDS / Contratação de consultoria individual especializada para orientação e promoção Component 2: Capacity Individual 2019-02- 2019-03- 2019-03- 2019-04- 2019-07- de informação qualificada TF / 18765 Building and Institutional Post Consultant Limited 0.00 Canceled 28 05 19 09 08 sobre a estratégia de Strengthening Selection REDD+ no contexto nacional e global, para público diversificado do Projeto DGM/Brasil SUB 16-14 / CQ16-14 Contratação de consultoria Component 1: Sustainable Individual Pending 2017-06- 2017-07- 2017-07- 2017-08- 2017-11- para elaboração de projeto TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 20 10 20 03 01 técnico de recuperação de Initiatives Selection nascentes e das áreas SUB 71 CI 01 / Consultoria Individual para elaboração do manual de boas práticas para os produtos do coco, realização do plano de Component 1: Sustainable Individual 2019-03- 2019-06- 2019-05- 2019-05- 2019-05- 2019-08- negócios. Estudo, TF / 18765 and Adaptive Community Post Consultant Open 0.00 Canceled 25 05 01 06 26 24 Padronização, adaptação Initiatives Selection dos produtos e da produção, boas práticas, armazenamento, estoque, dos produtos da Raízes do Campo BR-CAA-110404-CS-INDV / Contratação de consultoria individual para aplicar metodologia, técnicas e procedimentos Component 2: Capacity Individual 2019-04- 2019-07- 2019-05- 2019-06- 2019-07- 2019-12- associados à autoprodução TF / 18765 Building and Institutional Post Consultant Limited 0.00 Canceled 29 16 19 13 18 15 comunitária de painéis-kits Strengthening Selection solares, dimensionamento, montagem e instalação de pequenos sistemas de geração de energia elétrica solar. AI4 - 1 / Contratação de consultoria individual para Component 1: Sustainable Individual oficinas sobre tema REDD+, 2019-05- 2019-06- 2019-06- 2019-07- 2019-06- 2019-10- 2019-06- 2019-10- 2019-08- 2020-04- TF / 18765 and Adaptive Community Post Consultant Limited 3,124.74 Completed e produzir uma minuta de 27 12 06 11 14 15 22 15 21 30 Initiatives Selection conteúdo do folder que será distribuído SUB 195 - 2 / Contratação Component 1: Sustainable Individual de consultoria para Under 2019-06- 2019-10- 2019-07- 2019-07- 2019-08- 2019-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 elaboração de Plano Implementation 25 18 10 25 04 03 Initiatives Selection Territorial e Ambiental da TI Sandradouro. SUB 2120-2 / Contratação Component 1: Sustainable Individual de consultoria para Pending 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 realização de planta baixa Implementation 24 09 24 03 02 Initiatives Selection para construção da cozinha comunitária SUB 241-6 / Contratação Component 1: Sustainable Individual de consultoria para Under 2019-06- 2019-08- 2019-06- 2019-09- 2019-07- 2019-10- 2019-08- 2019-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 elaboração de Plano de Implementation 17 26 22 06 13 14 17 16 Initiatives Selection Gestão Territorial, Produtiva e Ambiental SUB 71 CI 02 / Consultoria Individual para elaboração do manual de boas práticas para os produtos do coco. Component 1: Sustainable Individual Under 2019-06- 2019-08- 2019-07- 2019-08- 2019-08- 2019-12- Estudo, Padronização, TF / 18765 and Adaptive Community Post Consultant Open 0.00 Implementation 27 08 26 05 20 18 adaptação dos produtos e Initiatives Selection da produção, boas práticas, armazenamento, estoque, dos produtos da Raízes do Campo. BR-CAA-110405-CS-INDV / Contratação de consultoria individual, para aplicar metodologias, técnicas e procedimentos Component 2: Capacity 2019-07- 2019-06- 2019-08- 2019-10- 2020-04- associados a autoprodução TF / 18765 Building and Institutional Post Direct Selection Direct 0.00 Under Review 22 05 01 05 02 comunitária de painéis-kits Strengthening solares, dimensionamento, montagem e instalação de pequenos sistemas de geração, de elétrica solar SUB 169- CI 001.2019 / Component 1: Sustainable Individual Contratação de Consultoria 2019-09- 2019-09- 2019-10- 2019-09- 2019-10- 2019-11- 2019-11- 2019-12- 2020-01- 2020-06- TF / 18765 and Adaptive Community Post Consultant Limited 1,010.71 Completed Individual para 20 23 05 24 20 28 15 02 14 26 Initiatives Selection Levantamento dos atrativos turísticos. BR-CAA-133672-CS-INDV / Contratação de pessoa física para de criação, Component 2: Capacity Individual envolvendo pesquisas, Under 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2020-02- TF / 18765 Building and Institutional Post Consultant Limited 0.00 concepção, produção Implementation 15 14 30 05 15 12 Strengthening Selection musical, gravação, mixagem, masterização de trilha sonora vídeo musical do DGM/FIP/Brasil. BR-CAA-133677-CS-INDV / Contratação de profissional, pessoa física, para prover orientações técnicas junto aos Component 1: Sustainable Individual Under 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2020-02- subprojetos que estão TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 15 03 30 05 15 12 executando e/ou vão iniciar Initiatives Selection a execução de pequenas obras de reforma e/ou construções simples, adequadas às condições de vida dos povos indígenas, SUB 170 - CI 1 / Contratação de consultoria Component 1: Sustainable Individual Under 2019-09- 2019-09- 2019-09- 2019-10- 2019-10- 2020-02- para desenvolvimento de TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Implementation 20 23 30 05 12 09 SAFs e plantios Initiatives Selection consorciados (Ciências Agrárias) SUB 169- CI 002.2019 / Component 1: Sustainable Individual Contratação de Consultoria Under 2019-10- 2019-09- 2019-11- 2019-11- 2019-12- 2020-03- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Individual para diagnóstico Implementation 22 25 06 21 01 01 Initiatives Selection do conflito das associações BR-CAA-135088-CS-INDV / Contratação de Component 2: Capacity Individual 2019-10- 2020-08- 2019-10- 2020-03- 2019-10- 2020-06- 2019-11- 2020-09- 2020-02- 2021-05- profissional para realização TF / 18765 Building and Institutional Post Consultant Limited 7,584.71 Completed 10 13 15 09 30 10 15 01 13 05 de curso de formação de Strengthening Selection lideranças voltado para mulheres. BR-CAA-135429-CS-INDV / Consultoria individual para realização de oficina sobre comunicação estratégica Component 2: Capacity Individual 2019-09- 2020-08- 2019-10- 2019-10- 2019-10- 2020-04- 2019-10- 2020-09- 2020-02- 2021-06- junto a povos indígenas, TF / 18765 Building and Institutional Post Consultant Limited 8,458.05 Completed 24 13 09 25 14 10 22 16 19 04 quilombolas, comunidades Strengthening Selection tradicionais e parceiros do projeto e CAA, tendo por foco a juventude. SUB 3-10 / Contratação de serviços técnico especializado para Component 1: Sustainable Individual elaboração de planta baixa, 2017-09- 2017-09- 2017-10- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled com memorial descritivo e 11 16 01 10 09 Initiatives Selection orçamento para construção de um galpão para armazenamento e uso das comunidades indígenas. SUB 98 - 15 / Contratacao de assessoria tecnica para Component 1: Sustainable Individual elaborar projeto tecnico da 2018-01- 2018-02- 2018-02- 2018-03- 2018-10- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled casa cultura incluindo 22 09 19 05 21 Initiatives Selection projeto arquitetonico, memorial descritivo BR-CAA-133560-CS-INDV / Contratação de profissional para apoio Component 3: Project Individual junto a equipe financeira 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2020-01- TF / 18765 Management, Monitoring Post Consultant Limited 0.00 Canceled para análise dos 15 17 25 30 07 05 and Evaluation Selection lançamentos e correções no sistema de gestão, referente receitas e despesas dos anos 2015-2018 SUB 127-33 / Contratacao de profissional para elaboracao de Plano de Component 1: Sustainable Individual 2017-11- 2017-12- 2017-12- 2018-01- 2018-03- Funcionando do Centro de TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled 28 12 26 08 09 Revitalizacao e treinamento Initiatives Selection aos colaboradores que irao trabalhar no local SUB 127-34 / Contratação de serviços para Component 1: Sustainable Individual criação/desenvolvimento de 2018-05- 2018-06- 2018-06- 2018-07- 2019-01- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled site - incluindo design e 31 05 26 06 02 Initiatives Selection programação e treinamento para alimentação do site. SUB 47-8 / Contratação de serviços especializados de Component 1: Sustainable Individual engenharia, para elaboração 2017-09- 2017-09- 2017-09- 2017-10- 2017-12- TF / 18765 and Adaptive Community Post Consultant Limited 0.00 Canceled de projeto básico de 11 16 26 10 09 Initiatives Selection reforma de um galpão e um ponto de beneficiamento de frutos. BR-CAA-166615-CS-INDV / Contratação de consultoria individual Component 2: Capacity Individual especializada, para a 2020-04- 2020-04- 2020-05- 2020-06- 2020-08- TF / 18765 Building and Institutional Post Consultant Direct 0.00 Canceled realização do módulo Curso 06 26 17 21 20 Strengthening Selection de aprofundamento em Energia Fotovoltaica junto a público diversificado do Projeto BR-CAA-197009-CS-INDV / Contratação de consultor individual para profissional da área de educação à Component 2: Capacity Individual distância ou ambiente Pending 2020-10- 2020-10- 2020-11- 2020-11- 2021-02- TF / 18765 Building and Institutional Post Consultant Open 0.00 virtual de aprendizagem Implementation 04 31 10 18 16 Strengthening Selection para ministrar cursos sobre o domínio de plataformas digitais, ferramentas e recursos disponíveis BR-CAA-239241-CS-INDV / Contratacao de consultoria individual especializada para Component 2: Capacity Individual Pending 2021-06- 2021-08- 2021-08- 2021-09- 2022-03- orientacao e promocao de TF / 18765 Building and Institutional Post Consultant Open 0.00 Implementation 14 02 23 27 26 informacao qualificada Strengthening Selection sobre a estrategia de REDD+ no contexto nacional e global, para publico diversificado do Projeto DGM Brasil Page 21 PROCUREMENT PLAN (Textual Part) Information sur le Projet : Cote d’Ivoire, Projet Multisectoriel de Nutrition et de Développement de la Petite Enfance, P161770 Agence d’exécution du Projet : Unité de Gestion du Projet, Secrétariat Exécutif du Conseil National de la Nutrition, de l’Alimentation et de la Petite Enfance Date du plan de passation des marchés : 11 novembre 2019 Période couverte par ce plan de passation des marchés : Novembre 2019 – April 2021 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016, révisé en aout 2019) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marché se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : Sans objet. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas Travaux : ne s’applique pas Autres informations pertinentes sur la passation des marchés : Néant. PROCUREMENT Cote d'Ivoire : Multisectoral Nutrition and Child Development Project PLAN General Information Country: Cote d'Ivoire Bank’s Approval Date of the Original Procurement Plan: 2019-12-06 2021-05-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161770 GPN Date: Project Name: Multisectoral Nutrition and Child Development Project Loan / Credit No: IDA / 61740, IDA / V1050 Multisectoral Nutrition and Child Development Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PMNDPE-72404-GO-RFQ Pending / Acquisition de fournitures Request for Single Stage - One IDA / 61740 Project management Post Limited 10,000.00 0.00 Implementati 2018-08-20 2018-10-15 2018-10-30 de bureau pour le PPF- Quotations Envelope on PMNDPE CI-PMNDPE-72467-GO-RFQ / ACQUISITION DE MATÉRIELS Pending Request for Single Stage - One DE DÉMONSTRATION IDA / 61740 Project management Post Limited 10,000.00 0.00 Implementati 2018-08-06 2018-10-09 2019-04-10 Quotations Envelope CULINAIRE (marmites, on casseroles,cuisinière) CI-PMNDPE-72469-GO-RFQ / ACQUISITION DE SUPPORTS Pending D'ANIMATION ET DE Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 10,000.00 0.00 Implementati 2018-08-27 2018-10-11 2018-11-10 COMMUNICATION (outils de development interventions Quotations Envelope on démonstration,supports de jeux,boites à images) CI-PMNDPE-72472-GO-RFQ Pending Request for Single Stage - One / ACQUISITION DE MOBILIER IDA / 61740 Project management Post Limited 50.00 0.00 Implementati 2018-09-10 2018-11-05 2019-05-07 Quotations Envelope DE BUREAU POUR LE PMNDPE on CI-PMNDPE-72575-GO-DIR / Acquisition d'équipements Pending Early child nutrition and pour les structures IDA / 61740 Post Direct Selection Direct 20,000.00 0.00 Implementati 2018-08-23 2018-09-07 2018-10-12 2018-11-11 development interventions communautaires (balance, on toise, mètre ruban, MUAC) CI-PMNDPE-72680-GO-RFQ Pending / Acquisition de Matériels Request for Single Stage - One IDA / 61740 Project management Post Limited 40,000.00 0.00 Implementati 2018-09-03 2018-10-29 2018-11-28 informatiques et de Matériels Quotations Envelope on de Bureau pour le PMNDPE CI-PMNDPE-109850-GO-DIR / Acquérir du matériel Pending anthropométrique de Early child nutrition and IDA / 61740 Post Direct Selection Direct 600,000.00 0.00 Implementati 2019-04-25 2019-04-30 2019-06-04 2019-12-01 démonstration culinaire development interventions on d'éveil et les équipements au profit des FRANC CI-PMNDPE-110685-GO-RFQ / Acquisition d'équipements Pending et bureau pour le déploiement Request for Single Stage - One IDA / 61740 Project management Post Open - National 80,000.00 0.00 Implementati 2019-04-30 2019-06-24 2019-12-21 et l'installation des équipes Quotations Envelope on régionales (Points focaux, comptables) CI-PMNDPE-110616-GO-RFQ Pending / Acquisition de groupe Request for Single Stage - One IDA / 61740 Project management Post Open - National 30,000.00 0.00 Implementati 2019-04-29 2019-06-24 2019-12-21 électrogène pour l'UGP Quotations Envelope on PMNDPE CI-PMNDPE-110625-GO-RFQ Pending / Fourniture et installation de Request for Single Stage - One IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-04-09 2019-06-04 2019-12-01 consommables informatiques Quotations Envelope on pour le PMNDPE CI-PMNDPE-110621-GO-DIR Pending / Fourniture et installation IDA / 61740 Project management Post Direct Selection Direct 160,000.00 0.00 Implementati 2019-04-01 2019-04-11 2019-05-16 2019-11-12 d'un Progiciel de suivi et on évaluation spécifique au Projet CI-PMNDPE-110622-GO-DIR / Acquérir du matériel anthropométrique, de démonstration culinaire, d'éveil et les équipements au Pending profit des FRANC (150 kits de IDA / 61740 Project management Post Direct Selection Direct 600,000.00 0.00 Implementati 2019-03-01 2019-03-06 2019-04-10 2019-10-07 matériel anthropométrique, on 150 Kits de démonstration culinaire, 150 Kits d'éveil, et des équipements sont disponibles) CI-PMNDPE-123693-GO-RFQ Pending Request for Single Stage - One / ACQUISITION DE MOBILIERS IDA / 61740 Project management Post Open - National 60,000.00 0.00 Implementati 2019-07-24 2019-09-18 2020-03-16 Quotations Envelope DE BUREAU COMPLÉMENTAIRE on CI-PMNDPE-123698-GO-RFQ / FOURNITURE ET Pending Request for Single Stage - One INSTALLATION DE MATÉRIELS IDA / 61740 Project management Post Open - National 40,000.00 0.00 Implementati 2019-08-05 2019-09-30 2020-03-28 Quotations Envelope INFORMATIQUES POUR LES on ANTENNES RÉGIONALES Page 1 CI-PMNDPE-123700-GO-RFQ / FOURNITURE ET Pending INSTALLATION DE MOBILIERS Request for Single Stage - One IDA / 61740 Project management Post Open - National 6,000.00 0.00 Implementati 2019-08-05 2019-09-30 2020-03-28 DE BUREAU AUTRE Quotations Envelope on QU'INFORMATIQUES POUR LES ANTENNES RÉGIONALES CI-PMNDPE-123701-GO-RFQ / FOURNITURE ET Pending INSTALLATION DE MATÉRIELS Request for Single Stage - One IDA / 61740 Project management Post Open - National 8,000.00 0.00 Implementati 2019-08-05 2019-09-30 2020-03-28 ET OUTILLAGES TECHNIQUES Quotations Envelope on POUR LES ANTENNES RÉGIONALES CI-PMNDPE-123704-GO-RFP / ACQUISITION DE VÉHICULES Request for Single Stage - One IDA / 61740 Project management Post Limited 400,000.00 286,092.07 Signed 2019-10-21 2019-09-26 2019-12-16 2019-11-06 2020-06-13 POUR LES ANTENNES Quotations Envelope RÉGIONALES CI-PMNDPE-123707-GO-RFP / ACQUISITION DE 31 MOTOS Under POUR LES SUPERVISEURS DANS Request for Single Stage - Two IDA / 61740 Project management Post Open - National 100,000.00 0.00 Implementati 2019-07-31 2019-07-30 2019-08-05 2019-09-16 2019-11-29 2020-01-03 2020-07-01 LE CADRE DE LA MISE EN Proposals Envelope on OEUVRE DES ACTIONS COMMUNAUTAIRES CI-PMNDPE-123723-GO-DIR / ACQUÉRIR DU MATÉRIEL ANTHROPOMÉTRIQUE, DE DÉMONSTRATION CULINAIRE, D'ÉVEIL ET LES ÉQUIPEMENTS Pending AU PROFIT DES FRANC (150 IDA / 61740 Project management Post Direct Selection Direct 600,000.00 0.00 Implementati 2019-07-31 2019-08-05 2019-09-09 2020-03-07 KITS DE MATÉRIEL on ANTHROPOMÉTRIQUE, 150 KITS DE DÉMONSTRATION CULINAIRE, 150 KITS D'ÉVEIL, ET DES ÉQUIPEMENTS SONT DISPONIBLES) CI-PMNDPE-123766-GO-RFQ Pending / ACQUISITION DE Request for Single Stage - One IDA / 61740 Project management Post Open - National 80,000.00 0.00 Implementati 2019-07-24 2019-09-18 2020-03-16 FOURNITURES DE BUREAU Quotations Envelope on POUR L’UGP CI-PMNDPE-123768-GO-RFQ Pending / Fourniture et installation de Request for Single Stage - One IDA / 61740 Project management Post Open - National 22,000.00 0.00 Implementati 2019-07-24 2019-09-18 2020-03-16 consommables informatiques Quotations Envelope on pour le PMNDPE CI-PMNDPE-139031-GO-RFQ Pending Request for Single Stage - One / Acquisition de GPS pour les IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-02-28 Quotations Envelope véhicules du projet on CI-PMNDPE-139035-GO-RFQ Pending / Fourniture et installation Request for Single Stage - One IDA / 61740 Project management Post Limited 40,000.00 0.00 Implementati 2019-11-13 2020-01-08 2020-07-06 d'un serveur pour l'UGP Quotations Envelope on PMNDPE CI-PMNDPE-72587-GO-DIR / Pending Acquisition d'un GPS pour les IDA / 61740 Project management Post Direct Selection Direct 1.00 0.00 Implementati 2018-09-05 2018-09-10 2018-10-06 2018-10-16 besoins du STP CNN on CI-PMNDPE-183000-GO-RFQ / Fourniture et livraison de 7 Under véhicules (3 pour les antennes Early child nutrition and Request for Single Stage - One IDA / 61740 Post Open - National 500,000.00 427,449.33 Implementati 2020-08-01 2020-09-26 2021-03-25 régionales, 3 pour le SE- development interventions Quotations Envelope on CONNAPE et 1 pour UGP PMNDPE) CI-PMNDPE-183004-GO-RFQ / Fourniture et livraison de Pending Early child nutrition and Request for Single Stage - One mobilier de bureau IDA / 61740 Post Open - National 80,000.00 0.00 Implementati 2020-07-19 2020-09-13 2021-03-12 development interventions Quotations Envelope complémentaire pour les on antennes régionales CI-PMNDPE-183010-GO-RFQ / Fourniture et livraison de Pending Early child nutrition and Request for Single Stage - One matériels informatiques IDA / 61740 Post Open - National 40,000.00 0.00 Implementati 2020-08-04 2020-09-29 2021-03-28 development interventions Quotations Envelope complémentaires pour les on antennes régionales CI-PMNDPE-183011-GO-RFQ / Fourniture et livraison Pending Early child nutrition and Request for Single Stage - One d'outillages techniques IDA / 61740 Post Limited 40,000.00 0.00 Implementati 2020-08-02 2020-09-27 2021-03-26 development interventions Quotations Envelope complémentaires pour les on antennes régionales CI-PMNDPE-183279-GO-RFQ Pending Early child nutrition and Request for Single Stage - One / Acquisition de fournitures IDA / 61740 Post Open - National 80,000.00 0.00 Implementati 2020-08-19 2020-10-14 2021-04-12 development interventions Quotations Envelope de bureau pour l'UGP on CI-PMNDPE-183519-GO-RFQ Pending / Fourniture de Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 40,000.00 0.00 Implementati 2020-08-17 2020-10-12 2021-04-10 consommables informatiques development interventions Quotations Envelope on pour l'UGP PMNDPE CI-PMNDPE-183533-GO-RFQ Pending Early child nutrition and Request for Single Stage - One / Acquisition de fournitures IDA / 61740 Post Limited 60,000.00 0.00 Implementati 2020-08-04 2020-09-29 2021-03-28 development interventions Quotations Envelope techniques pour l'UGP on CI-PMNDPE-183540-GO-DIR / Fourniture et livraison de 45 motos au profit des Early child nutrition and IDA / 61740 Post Direct Selection Direct 138,000.00 120,942.29 Signed 2020-07-20 2020-03-16 2020-07-25 2020-03-30 2020-08-29 2020-06-05 2021-02-25 superviseurs de 45 sous- development interventions préfectures dans le cadre du PMNDPE CI-PMNDPE-184233-GO-DIR Pending / Fourniture de carburant à Early child nutrition and IDA / 61740 Post Direct Selection Direct 150,000.00 0.00 Implementati 2020-07-23 2020-07-28 2020-09-01 2021-02-28 l'UGP PMNDPE au titre de development interventions on l'année 2020 Page 2 CI-PMNDPE-185140-GO-RFB / Fournitures et livraison de Under Early child nutrition and Single Stage - One 130 motos pour les IDA / 61740 Post Request for Bids Open - National 520,000.00 0.00 Implementati 2020-08-31 2020-09-01 2020-09-05 2020-09-21 2020-10-17 2020-10-14 2020-11-16 2020-10-22 2020-12-21 2021-06-19 development interventions Envelope superviseurs dans le cadre du on PMNDPE CI-PMNDPE-233975-GO-RFQ Pending Early child nutrition and Request for Single Stage - One / Acquérir le matériel IDA / 61740 Post Limited 50,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 development interventions Quotations Envelope informatique pour l'UGP on CI-PMNDPE-233982-GO-RFQ Pending Early child nutrition and Request for Single Stage - One / Acquérir des consommables IDA / 61740 Post Limited 50,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 development interventions Quotations Envelope informatiques pour l'UGP on CI-PMNDPE-233965-GO-RFQ Pending / Acquisition de fournitures Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 60,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 de bureau pour l'Unité de development interventions Quotations Envelope on Gestion du POMNDPE CI-PMNDPE-233937-GO-RFQ Pending / Acquisition de matériels Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 30,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 informatiques pour les development interventions Quotations Envelope on CORNAPE CI-PMNDPE-234039-NC-RFQ / Acquérir du matériel de lutte Pending contre la COVID (Masques, Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 60,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 dispositif de lavage des development interventions Quotations Envelope on mains, gel hydroalcoolique, savons, etc) CI-PMNDPE-233894-GO-RFQ / Acquisition de matériels Pending Early child nutrition and Request for Single Stage - One bureautiques bureautiques et IDA / 61740 Post Limited 70,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 development interventions Quotations Envelope informatiques pour le SE- on CONNAPE CI-PMNDPE-233959-GO-RFQ / Acquisition de matériels informatiques, de fournitures Pending Early child nutrition and Request for Single Stage - One de bureau pour le SE- IDA / 61740 Post Limited 66,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 development interventions Quotations Envelope CONNAPE, les Comités on Régionaux de Nutrition et les ministères sectoriels CI-PMNDPE-234016-NC-RFQ / Acquisition de matériels anthropométriques et kits de Pending démonstration culinaires pour Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 84,000.00 0.00 Implementati 2021-06-30 2021-08-25 2022-02-21 l'équipement des Unités development interventions Quotations Envelope on Nutritionnelles en supplémentation dans les centres sociaux CI-PMNDPE-233952-GO-RFQ Pending Early child nutrition and Request for Single Stage - One / Acquisition de fourniture de IDA / 61740 Post Limited 20,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 development interventions Quotations Envelope bureau pour les CORNAPE on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PMNDPE-72668-NC-RFQ / Recrutement d'un Prestataire Pending pour la fourniture de polices IDA / 61740 Project management Post Direct Selection Direct 5,000.00 0.00 Implementati 2018-08-22 2018-08-27 2018-10-01 2019-03-30 d'assurances pour le véhicule on acquis pour les besoins du STP CI-PMNDPE-110627-NC-RFQ Pending Request for Single Stage - One / Assurer les charges de IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-03-05 2019-05-03 2019-10-30 Quotations Envelope communication du personnel on CI-PMNDPE-110631-NC-DIR Pending / Acquisition de carburant IDA / 61740 Project management Post Direct Selection Direct 60,000.00 0.00 Implementati 2019-03-15 2019-03-20 2019-04-24 2019-10-21 pour l'UGP PMNDPE on CI-PMNDPE-110623-NC-RFB / Vulgariser le plan de Pending Nutrition governance and Single Stage - One communication intégré et IDA / 61740 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2019-04-15 2019-04-20 2019-06-01 2019-07-01 2019-08-05 2020-02-01 management Envelope multisectoriel (2000 on exemplaires du PICM) CI-PMNDPE-110687-NC-RFQ Pending Nutrition governance and Request for Single Stage - One / Reproduire en série les IDA / 61740 Post Open - National 100,000.00 0.00 Implementati 2019-04-20 2019-06-15 2019-12-12 management Quotations Envelope supports de communication on CI-PMNDPE-110626-NC-RFQ / Reproduire les supports de Pending Nutrition governance and Request for Single Stage - One formation pour 1000 IDA / 61740 Post Open - National 40,000.00 0.00 Implementati 2019-04-20 2019-06-15 2019-12-12 management Quotations Envelope structures dotées de kit de on formation dans les régions CI-PMNDPE-110630-NC-RFQ Pending Request for Single Stage - One / Assurer les frais d'entretien IDA / 61740 Project management Post Open - National 7,000.00 0.00 Implementati 2019-06-20 2019-08-15 2020-02-11 Quotations Envelope des véhicules on CI-PMNDPE-110639-NC-RFQ / Acquisition de petits matériels de bureau et Pending Request for Single Stage - One fournitures (électroménagers, IDA / 61740 Project management Post Open - National 30,000.00 0.00 Implementati 2019-03-29 2019-05-16 2019-11-12 Quotations Envelope assiette et autres liés à la on cuisine et restauration du personnel du PMNDPE CI-PMNDPE-110636-NC-RFQ Pending / Aménagement des locaux Request for Single Stage - One IDA / 61740 Project management Post Open - National 100,000.00 0.00 Implementati 2019-03-16 2019-05-03 2019-10-30 (cloisonnement, câblage Quotations Envelope on réseau) Page 3 CI-PMNDPE-110637-NC-RFQ Pending Request for Single Stage - One / Service de nettoyage des IDA / 61740 Project management Post Open - National 30,000.00 0.00 Implementati 2019-03-27 2019-05-16 2019-11-12 Quotations Envelope locaux du PMNDPE on CI-PMNDPE-123716-NC-RFB / VULGARISER LE PLAN DE Pending Nutrition governance and Single Stage - One COMMUNICATION INTÉGRÉ ET IDA / 61740 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2019-08-30 2019-09-04 2019-10-16 2019-11-15 2019-12-20 2020-06-17 management Envelope MULTI SECTORIEL 2000 on EXEMPLAIRES DU PICM CI-PMNDPE-123714-NC-RFQ Pending Nutrition governance and Request for Single Stage - One / Reproduire en série les IDA / 61740 Post Open - National 100,000.00 0.00 Implementati 2019-09-04 2019-10-30 2020-04-27 management Quotations Envelope supports de communication on CI-PMNDPE-123717-NC-RFQ / Reproduire les supports de Pending Nutrition governance and Request for Single Stage - One formation pour 1000 IDA / 61740 Post Open - National 40,000.00 0.00 Implementati 2019-09-04 2019-10-30 2020-04-27 management Quotations Envelope structures dotées de kit de on formation dans les régions CI-PMNDPE-123719-NC-RFQ Pending Request for Single Stage - One / Assurer les charges de IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-08-05 2019-09-30 2020-03-28 Quotations Envelope communication du personnel on CI-PMNDPE-123720-NC-RFP Pending Request for Single Stage - Two / ASSURER LES FRAIS IDA / 61740 Project management Post Open - National 7,000.00 0.00 Implementati 2019-08-30 2019-09-04 2019-10-16 2019-12-29 2020-02-02 2020-07-31 Proposals Envelope D'ENTRETIEN DES VÉHICULES on CI-PMNDPE-123721-NC-DIR / FOURNITURE DE SERVICES Pending DE POLICE D’ASSURANCES, IDA / 61740 Project management Post Direct Selection Direct 20,000.00 0.00 Implementati 2019-07-31 2019-08-05 2019-09-09 2020-03-07 AUTOMOBILES POUR LES 4 on VÉHICULES ACQUIS DANS LE CADRE DU PMNDPE CI-PMNDPE-123728-NC-RFP / ACQUÉRIR DU MATÉRIEL ANTHROPOMÉTRIQUE, DE DÉMONSTRATION CULINAIRE, D'ÉVEIL ET LES ÉQUIPEMENTS Pending AU PROFIT DES FRANC (150 Request for Single Stage - Two IDA / 61740 Project management Post Open - National 30,000.00 0.00 Implementati 2019-07-31 2019-08-05 2019-09-16 2019-11-29 2020-01-03 2020-07-01 KITS DE MATÉRIEL Proposals Envelope on ANTHROPOMÉTRIQUE, 150 KITS DE DÉMONSTRATION CULINAIRE, 150 KITS D'ÉVEIL, ET DES ÉQUIPEMENTS SONT DISPONIBLES) CI-PMNDPE-123730-NC-RFP / RÉHABILITATION DES Pending Request for Single Stage - Two LOCAUX DE TROIS ANTENNES IDA / 61740 Project management Post Open - National 90,000.00 0.00 Implementati 2019-07-31 2019-08-05 2019-09-16 2019-11-29 2020-01-03 2020-07-01 Proposals Envelope RÉGIONALES (KORHOGO, on BONDOUKOU ET ODIENNÉ) CI-PMNDPE-123734-NC-RFP / MAINTENANCE D’UN Pending Request for Single Stage - Two PROGICIEL DE SUIVI ET IDA / 61740 Project management Post Open - National 50,000.00 0.00 Implementati 2019-09-02 2019-09-07 2019-10-19 2020-01-01 2020-02-05 2020-08-03 Proposals Envelope ÉVALUATION SPÉCIFIQUE AU on PROJET CI-PMNDPE-123743-NC-RFP Pending Request for Single Stage - Two / SERVICE DE GARDIENNAGE IDA / 61740 Project management Post Open - National 18,000.00 0.00 Implementati 2019-07-19 2019-07-24 2019-09-04 2019-11-17 2019-12-22 2020-06-19 Proposals Envelope DES LOCAUX DU PMNDPE on CI-PMNDPE-123746-NC-RFP Pending Request for Single Stage - Two / SERVICE DE NETTOYAGE DES IDA / 61740 Project management Post Open - National 30,000.00 0.00 Implementati 2019-07-19 2019-07-24 2019-09-04 2019-11-17 2019-12-22 2020-06-19 Proposals Envelope LOCAUX DU PMNDPE on CI-PMNDPE-123748-NC-RFP / TRAVAUX DE CÂBLAGE DES Pending NOUVEAUX LOCAUX DU Request for Single Stage - Two IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-07-19 2019-07-24 2019-09-04 2019-11-17 2019-12-22 2020-06-19 PMNDPE ET FOURNITURE ET Proposals Envelope on INSTALLATION D’UN AUTOCOMMUTATEUR CI-PMNDPE-123749-NC-RFP / FOURNITURE ET POSE D’UNE Pending ENSEIGNE LUMINEUSE + Request for Single Stage - Two IDA / 61740 Project management Post Open - National 30,000.00 0.00 Implementati 2019-07-19 2019-07-24 2019-09-04 2019-11-17 2019-12-22 2020-06-19 PANNEAUX DIRECTIONNELS Proposals Envelope on DES NOUVEAUX LOCAUX DU PMNDPE CI-PMNDPE-123750-NC-RFQ Pending / TRAVAUX DE PLOMBERIE DES Request for Single Stage - One IDA / 61740 Project management Post Open - National 3,000.00 0.00 Implementati 2019-07-24 2019-09-18 2020-03-16 NOUVEAUX LOCAUX DU Quotations Envelope on PMNDPE CI-PMNDPE-123751-NC-RFP / TRAVAUX D’AMÉNAGEMENT Pending DU BÂTIMENT ANNEXE DES Request for Single Stage - Two IDA / 61740 Project management Post Open - National 80,000.00 0.00 Implementati 2019-07-19 2019-07-24 2019-09-04 2019-11-17 2019-12-22 2020-06-19 NOUVEAUX LOCAUX DU Proposals Envelope on PMNDPE (CONTENEUR MODULAIRE) CI-PMNDPE-123753-NC-RFP / TRAVAUX D’AMÉNAGEMENT Pending Request for Single Stage - Two DU BÂTIMENT PRINCIPAL DES IDA / 61740 Project management Post Open - National 60,000.00 0.00 Implementati 2019-07-19 2019-07-24 2019-09-04 2019-11-17 2019-12-22 2020-06-19 Proposals Envelope NOUVEAUX LOCAUX DU on PMNDPE CI-PMNDPE-123756-NC-RFP / FOURNITURE ET Pending Request for Single Stage - One INSTALLATION D’UN GROUPE IDA / 61740 Project management Post Limited 80,000.00 0.00 Implementati 2019-10-23 2019-12-18 2020-06-15 Quotations Envelope ÉLECTROGÈNE + TRAVAUX on D’ÉLECTRICITÉ CI-PMNDPE-123759-NC-RFQ Pending / FOURNITURE ET POSE DE Request for Single Stage - One IDA / 61740 Project management Post Open - National 30,000.00 0.00 Implementati 2019-07-24 2019-09-18 2020-03-16 SPLITS DES NOUVEAUX Quotations Envelope on LOCAUX DU PMNDPE Page 4 CI-PMNDPE-139042-NC-RFQ Pending / Sélection d’un garage pour Request for Single Stage - One IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-11-04 2019-12-30 2019-12-31 l’entretien des véhicules du Quotations Envelope on Projet à Abidjan CI-PMNDPE-139051-NC-RFQ / Sélection d’un garage pour Pending l’entretien des véhicules du Request for Single Stage - One IDA / 61740 Project management Post Open - National 5,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 Projet dans les antennes Quotations Envelope on régionales du Poro, Tchologo et Bagoué CI-PMNDPE-139056-NC-RFQ / Sélection d’un prestataire Pending Request for Single Stage - One pour l’entretien et la IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 Quotations Envelope maintenance du matériel on informatique à Abidjan CI-PMNDPE-139066-NC-RFQ / Sélection d’un prestataire pour l’entretien et la Pending Request for Single Stage - One maintenance du matériel IDA / 61740 Project management Post Limited 5,000.00 0.00 Implementati 2019-12-04 2020-01-29 2020-07-27 Quotations Envelope informatique dans les on antennes régionales du Poro, Tchologo et Bagoué CI-PMNDPE-139069-NC-RFQ Pending / Sélection d’un prestataire Request for Single Stage - One IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 pour l’entretien des splits et Quotations Envelope on climatiseurs à Abidjan CI-PMNDPE-139094-NC-RFQ / Sélection d’un prestataire Pending Request for Single Stage - One pour l’entretien de la IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 Quotations Envelope plomberie- Electricité et on menuiserie à Abidjan CI-PMNDPE-139117-NC-RFQ / Sélection d’un prestataire pour l’entretien de la Pending Request for Single Stage - One plomberie- Electricité et IDA / 61740 Project management Post Open - National 5,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 Quotations Envelope menuiserie dans les antennes on régionales du Poro, Tchologo et Bagoué CI-PMNDPE-139122-NC-RFQ / Sélection d’un prestataire Pending Request for Single Stage - One pour l’entretien et la IDA / V1050 Project management Post Open - National 10,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 Quotations Envelope maintenance du matériel on informatique à Abidjan CI-PMNDPE-139126-NC-RFQ / Sélection d’un prestataire pour l’entretien et la Pending Request for Single Stage - One maintenance du matériel IDA / 61740 Project management Post Open - National 5,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 Quotations Envelope informatique dans les on antennes régionales du Poro, Tchologo et Bagoué CI-PMNDPE-139128-NC-RFQ / Sélection d’un prestataire Pending pour l’entretien et la Request for Single Stage - One IDA / 61740 Project management Post Open - National 10,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 maintenance des copieurs, Quotations Envelope on imprimantes, vidéoprojecteurs et appareils photos à Abidjan CI-PMNDPE-139131-NC-RFQ / Sélection d’un prestataire pour l’entretien et la Pending maintenance des copieurs, Request for Single Stage - One IDA / 61740 Project management Post Open - National 5,000.00 0.00 Implementati 2019-11-05 2019-12-31 2020-06-28 imprimantes, vidéoprojecteurs Quotations Envelope on et appareils photos dans les antennes régionales du Poro, Tchologo et Bagoué CI-PMNDPE-139135-NC-RFQ / Fourniture de services de Pending Request for Single Stage - One gardiennage pour les locaux IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-11-04 2019-12-30 2020-06-27 Quotations Envelope du bureau régional du on PMNDPE – KORHOGO CI-PMNDPE-139137-NC-RFQ / Fourniture de services Pending Request for Single Stage - One d'entretien et de nettoyage IDA / 61740 Project management Post Open - National 20,000.00 0.00 Implementati 2019-11-05 2019-12-31 2020-06-28 Quotations Envelope des locaux du bureau régional on du PMNDPE – KORHOGO CI-PMNDPE-139141-NC-RFQ Pending / Entretien du groupe Request for Single Stage - One IDA / 61740 Project management Post Open - National 10,000.00 0.00 Implementati 2020-01-05 2020-03-01 2020-08-28 électrogène du PMNDPE à Quotations Envelope on Abidjan CI-PMNDPE-139178-NC-RFQ / Travaux de câblage des Pending Request for Single Stage - One nouveaux locaux du PMNDPE IDA / 61740 Project management Post Limited 40,000.00 0.00 Implementati 2019-10-13 2019-12-08 2020-06-05 Quotations Envelope et fourniture et installation on d’un autocommutateur CI-PMNDPE-183557-NC-DIR / Reproduction et distribution de 170 Kits (Boîtes à Images AEN/DPE, guides de réhabilitation nutritionnelle à Pending Early child nutrition and base d’aliments locaux, Guide- IDA / 61740 Post Direct Selection Direct 40,000.00 0.00 Implementati 2020-07-17 2020-07-22 2020-08-26 2021-02-22 development interventions Mémoires pour les soins et on soutiens nutritionnels, guide national de recette pour l’alimentation de complément, tabl CI-PMNDPE-183563-NC-RFQ / Mise en place et Pending équipements des Unités Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 100,000.00 0.00 Implementati 2020-08-29 2020-10-24 2021-04-22 nutritionnels de development interventions Quotations Envelope on supplémentaires (UNS) dans les centres sociaux Page 5 CI-PMNDPE-183710-NC-RFQ / Appui au SE CONNAPE pour Pending Early child nutrition and Request for Single Stage - One les travaux d'aménagement IDA / 61740 Post Limited 70,000.00 0.00 Implementati 2020-08-18 2020-10-13 2021-04-11 development interventions Quotations Envelope des nouveaux locaux à usage on de bureau CI-PMNDPE-183734-NC-RFQ Pending / Acquisition et Équipement Early child nutrition and Request for Single Stage - One IDA / 61740 Post Open - National 70,000.00 0.00 Implementati 2020-08-29 2020-10-24 2021-04-22 des FRANC en 2000 kits development interventions Quotations Envelope on d'alphabétisation révisés CI-PMNDPE-183735-NC-RFQ / Reproduction des supports Pending Early child nutrition and Request for Single Stage - One de formation du Corps IDA / 61740 Post Limited 10,000.00 0.00 Implementati 2020-08-29 2020-10-24 2021-04-22 development interventions Quotations Envelope préfectoral et AEL (Environ 20 on exemplaires de chaque) CI-PMNDPE-183737-NC-DIR / Convention avec les radios Pending de proximité pour la Early child nutrition and IDA / 61740 Post Direct Selection Direct 55,000.00 0.00 Implementati 2020-07-24 2020-07-29 2020-09-02 2021-03-01 production et la diffusion development interventions on d'émissions interactives communautaires CI-PMNDPE-184236-NC-DIR Pending / Assurance maladie, Early child nutrition and IDA / 61740 Post Direct Selection Direct 180,000.00 0.00 Implementati 2020-07-23 2020-07-28 2020-09-01 2021-02-28 automobile, exploitation et development interventions on individuelle accident CI-PMNDPE-184239-NC-RFQ / Enseigne lumineuse des Pending locaux des antennes Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 24,000.00 0.00 Implementati 2020-08-26 2020-10-21 2021-04-19 régionales (Korhogo, development interventions Quotations Envelope on Bondoukou, Séguéla, Odienné, Bouaflé et Daoukro) CI-PMNDPE-184241-NC-RFQ / Recrutement d'un Prestataire Pending Early child nutrition and Request for Single Stage - One pour l'entretien des centraux IDA / 61740 Post Open - National 5,000.00 0.00 Implementati 2020-08-05 2020-09-30 2021-03-29 development interventions Quotations Envelope téléphoniques et on autocommutateur CI-PMNDPE-184243-NC-RFQ / Aménagement des locaux Pending Early child nutrition and Request for Single Stage - One (pause de pavés dans la cour IDA / 61740 Post Limited 10,000.00 0.00 Implementati 2020-08-18 2020-10-13 2021-04-11 development interventions Quotations Envelope et pause de rideaux) pour on l'UGP PMNDPE CI-PMNDPE-184966-NC-DIR / Acquisition par entente directe, de matériels anthropométriques (balances Early child nutrition and électroniques (350),MUAC IDA / 61740 Post Direct Selection Direct 208,000.00 186,215.26 Signed 2020-07-31 2020-07-19 2020-08-05 2020-07-21 2020-09-09 2020-09-16 2021-03-08 development interventions adultes (300) et MUAC enfants (300) dans le cadre de la conduite des interventions communautaires du PMNDPE CI-PMNDPE-185145-NC-RFQ / Recrutement d'un Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 20,000.00 11,024.71 Signed 2020-07-29 2020-04-23 2020-09-23 2020-07-14 2021-03-22 prestataire pour la création du development interventions Quotations Envelope site Web pour le PMNDPE CI-PMNDPE-190080-NC-RFB / Reproduction de supports de communication et de documents de base en nutrition (Boîtes à Images Early child nutrition and Single Stage - One AEN/DPE, guides de IDA / 61740 Post Request for Bids Open - National 750,000.00 252,937.78 Signed 2020-09-08 2020-08-11 2020-09-13 2020-08-26 2020-10-25 2020-09-22 2020-11-24 2020-09-25 2020-12-29 2020-11-16 2021-06-27 development interventions Envelope réhabilitation nutritionnelle à base d’aliments locaux, Guide- Mémoires pour les soins et soutiens nutritionnels, guide national de recette CI-PMNDPE-233994-NC-RFQ / Reproduire les maquettes et outils de communication en rapport avec la nutrition et le DPE (supports de Pending Early child nutrition and Request for Single Stage - One communication intégrant la IDA / 61740 Post Limited 60,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 development interventions Quotations Envelope promotion des on comportements sur la nutrition, la stimulation et l'éveil au niveau communautaire) CI-PMNDPE-234031-NC-RFQ Pending / Reproduire les supports de Early child nutrition and Request for Single Stage - One IDA / 61740 Post Limited 10,000.00 0.00 Implementati 2021-06-23 2021-08-18 2022-02-14 communication du corps development interventions Quotations Envelope on préfectoral CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PMNDPE-110642-CS-LCS / Recrutement de cinq (05) agences d'exécution locales (AEL), pour la mise en œuvre Early child nutrition and Least Cost Pending des projets de nutrition à base IDA / 61740 Post Open - National 200,000.00 0.00 2018-12-18 2019-01-08 2019-02-21 2019-03-20 2019-04-19 2019-05-24 2019-06-28 2019-12-25 development interventions Selection Implementation communautaire dans 23 sous- préfectures gans la région du Poro, zone d'intervention du PMNDPE Page 6 CI-PMNDPE-110649-CS-LCS / Recrutement de trois (03) agences d'exécution locales (AEL), pour la mise en œuvre Early child nutrition and Least Cost Pending des projets de nutrition à base IDA / 61740 Post Open - National 200,000.00 0.00 2018-12-23 2019-01-13 2019-02-26 2019-03-20 2019-04-19 2019-05-24 2019-06-28 2019-12-25 development interventions Selection Implementation communautaire dans 12 sous- préfectures gans la région du Tchologo, zone d'intervention du PMNDPE CI-PMNDPE-110646-CS-LCS / Recrutement de trois (03) agences d'exécution locales (AEL), pour la mise en œuvre Early child nutrition and Least Cost Pending des projets de nutrition à base IDA / 61740 Post Open - National 200,000.00 0.00 2018-12-23 2019-01-13 2019-02-26 2019-03-20 2019-04-19 2019-05-24 2019-06-28 2019-12-25 development interventions Selection Implementation communautaire dans 13 sous- préfectures gans la région de la Bagoue, zone d'intervention du PMNDPE CI-PMNDPE-110650-CS-LCS / Recrutement de six (06) agences d'exécution locales (AEL), pour la mise en œuvre Early child nutrition and Least Cost Pending des projets de nutrition à base IDA / 61740 Post Open - National 200,000.00 0.00 2018-12-23 2019-01-13 2019-02-26 2019-03-20 2019-04-19 2019-05-24 2019-06-28 2019-12-25 development interventions Selection Implementation communautaire dans 27 sous- préfectures gans la région du Gontougo, zone d'intervention du PMNDPE CI-PMNDPE-110652-CS-LCS / Recrutement de trois (03) agences d'exécution locales (AEL), pour la mise en œuvre Early child nutrition and Least Cost Pending des projets de nutrition à base IDA / 61740 Post Open - National 200,000.00 0.00 2018-12-17 2019-01-07 2019-02-20 2019-03-20 2019-04-19 2019-05-24 2019-06-28 2019-12-25 development interventions Selection Implementation communautaire dans 3 sous- préfectures gans la région du Bounkani, zone d'intervention du PMNDPE CI-PMNDPE-110653-CS-LCS / Recrutement d'un consultant Early child nutrition and Least Cost Pending IDA / 61740 Post Open - National 90,000.00 0.00 2018-12-21 2019-01-11 2019-02-24 2019-03-24 2019-04-23 2019-05-28 2019-07-02 2019-12-29 pour la réalisation d'une étude development interventions Selection Implementation de base CI-PMNDPE-110679-CS-LCS / Recrutement d'un consultant Quality And Cost- Pending IDA / 61740 Project management Post Open - National 100,000.00 0.00 2015-01-10 2015-01-31 2015-03-16 2015-04-13 2015-05-13 2015-06-17 2015-07-22 2016-07-21 pour l'audit comptable et Based Selection Implementation financier du PMNDPE CI-PMNDPE-110682-CS-CQS Consultant / Recrutement d'un consultant Pending IDA / 61740 Project management Post Qualification Open - National 240,000.00 0.00 2019-02-11 2019-03-04 2019-04-20 2019-05-20 2019-06-24 2019-12-21 pour l'enquête de référence Implementation Selection du projet CI-PMNDPE-124070-CS-CQS / RECRUTEMENT D’AGENCES D’EXECUTION LOCALES (AEL), Consultant POUR LA MISE EN ŒUVRE DES Early child nutrition and Under IDA / 61740 Post Qualification Open - National 4,000,000.00 0.00 2019-07-22 2020-04-08 2019-08-12 2019-09-25 2019-05-16 2019-10-25 2019-07-21 2019-11-29 2020-05-27 PROJETS DE NUTRITION A development interventions Implementation Selection BASE COMMUNAUTAIRE DANS LES ZONES D’INTERVENTION DU PMNDPE CI-PMNDPE-124074-CS-CQS Consultant / RECRUTEMENT D’UN Early child nutrition and Pending IDA / 61740 Post Qualification Open - National 50,000.00 0.00 2019-07-22 2019-08-12 2019-09-25 2019-10-25 2019-11-29 2020-05-27 CABINET EVALUATEUR DES development interventions Implementation Selection CAPACITES DES AEL CI-PMNDPE-124078-CS-CQS / RECRUTEMENT D’UN Consultant Early child nutrition and Pending CONSULTANT POUR LA IDA / 61740 Post Qualification Open - National 90,000.00 0.00 2019-08-15 2019-09-05 2019-10-19 2019-11-18 2019-12-23 2020-06-20 development interventions Implementation REALISATION D’UNE ETUDE DE Selection BASE CI-PMNDPE-124142-CS-LCS / RECRUTEMENT D'UN Least Cost Pending CONSULTANT POUR L’AUDIT IDA / 61740 Project management Post Open - National 100,000.00 0.00 2019-09-30 2019-10-21 2019-12-04 2020-01-01 2020-01-31 2020-03-06 2020-04-10 2020-10-07 Selection Implementation COMPTABLE ET FINANCIER DU PMNDPE CI-PMNDPE-124146-CS-CQS / RECRUTEMENT D'UN Consultant Pending CONSULTANT POUR IDA / 61740 Project management Post Qualification Limited 240,000.00 0.00 2019-07-22 2019-08-05 2019-09-04 2019-10-09 2020-04-06 Implementation L'ENQUÊTE DE RÉFÉRENCE DU Selection PROJET CI-PMNDPE-124151-CS-CQS / RECRUTEMENT D’UN CABINET POUR LA Consultant CONCEPTION, LA FOURNITURE Pending IDA / 61740 Project management Post Qualification Limited 100,000.00 0.00 2019-07-31 2019-08-14 2019-09-13 2019-10-18 2020-04-15 ET INSTALLATION D’UN Implementation Selection PROGICIEL DE SUIVI ET ÉVALUATION SPÉCIFIQUE AU PROJET CI-PMNDPE-139150-CS-CQS / Recrutement d’un cabinet Consultant pour la conception, la Pending IDA / 61740 Project management Post Qualification Open - National 100,000.00 0.00 2019-10-31 2019-11-21 2020-01-04 2020-02-03 2020-03-09 2020-09-05 fourniture et installation d’un Implementation Selection Progiciel de suivi et évaluation spécifique au Projet CI-PMNDPE-184247-CS-CQS / Appui à la mise en place de Consultant 1320 FRANC dans 138 Early child nutrition and Pending IDA / 61740 Prior Qualification Limited 10,000,000.00 0.00 2020-07-30 2020-08-13 2020-09-12 2020-10-17 2021-04-15 nouvelles sous-préfectures de development interventions Implementation Selection 11 régions non couvertes en 2019 CI-PMNDPE-184422-CS-CQS / Recrutement d'un cabinet d'études pour l'évaluation du Consultant Early child nutrition and Pending démarrage des prestations IDA / 61740 Post Qualification Limited 100,000.00 0.00 2020-08-03 2020-08-17 2020-09-16 2020-10-21 2021-04-19 development interventions Implementation des Agences d'Exécution Selection Locales dans la région du Poro, Tchologo et Bagoué Page 7 CI-PMNDPE-184424-CS-CQS Consultant / Recrutement d'un cabinet Early child nutrition and Pending IDA / 61740 Post Qualification Limited 100,000.00 0.00 2020-08-04 2020-08-18 2020-09-17 2020-10-22 2021-04-20 pour la conduite de l'étude development interventions Implementation Selection (LQAS) CI-PMNDPE-184425-CS-CQS / Recrutement d'un cabinet Consultant Early child nutrition and Pending pour la réalisation du IDA / 61740 Post Qualification Limited 36,000.00 0.00 2020-08-05 2020-08-19 2020-09-18 2020-10-23 2021-04-21 development interventions Implementation diagnostic organisationnel du Selection SE-CONNAPE CI-PMNDPE-234387-CS-CQS / Recrutement d'un consultant Consultant pour conduire des études et Early child nutrition and Pending IDA / 61740 Post Qualification Limited 260,000.00 0.00 2021-06-30 2021-07-14 2021-08-13 2021-09-17 2022-03-16 des évaluations (LQAS? Coût- development interventions Implementation Selection Efficacité, évaluation de la qualité des données) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PMNDPE-72503-CS-CQS / RECRUTEMENT D'UN Individual CONSULTANT INDIVIDUEL Nutrition governance and Pending IDA / 61740 Post Consultant Limited 15,000.00 0.00 2018-08-30 2018-09-04 2018-09-25 2018-10-30 2019-04-28 JURISTE POUR L'ÉLABORATION management Implementation Selection DES ARRÊTES RELATIFS A LA MISE EN ŒUVRE DU PNMN CI-PMNDPE-72505-CS-CQS / RECRUTEMENT D'UN CONSULTANT INDIVIDUEL Individual Nutrition governance and Pending POUR UNE ÉTUDE DE IDA / 61740 Post Consultant Limited 30,000.00 0.00 2018-08-30 2018-09-04 2018-09-25 2018-10-30 2019-01-28 management Implementation FAISABILITÉ POUR LA MISE EN Selection PLACE DES FONDS INNOVANTS DE NUTRITION CI-PMNDPE-72507-CS-CQS / RECRUTEMENT D'UN CONSULTANT POUR LA Individual CARTOGRAPHIE DES Early child nutrition and Pending IDA / 61740 Post Consultant Limited 10,000.00 0.00 2018-08-30 2018-09-04 2018-09-25 2018-10-30 2018-12-14 INTERVENANTS ET DES development interventions Implementation Selection INTERVENTIONS EN DÉVELOPPEMENT DE LA PETITE ENFANCE CI-PMNDPE-72519-CS-CQS / RECRUTEMENT D'UN RESPONSABLE TECHNIQUE Individual Pending CHARGE DE LA NUTRITION A IDA / 61740 Project management Post Consultant Open 40.00 0.00 2018-08-30 2018-10-18 2018-11-08 2018-12-13 2019-06-11 Implementation BASE COMMUNAUTAIRE ET DU Selection DÉVELOPPEMENT DES ENFANTS (RCCSC) CI-PMNDPE-72523-CS-QCBS Individual Pending / RECRUTEMENT D'UN CHEF IDA / 61740 Project management Post Consultant Open 80.00 0.00 2018-08-30 2018-10-18 2018-11-08 2018-12-13 2019-06-11 Implementation DE PROJET POUR LE PMNDPE Selection CI-PMNDPE-72596-CS-INDV Individual / Recrutement d'un Pending IDA / 61740 Project management Post Consultant Open 55.00 0.00 2018-08-09 2018-09-27 2018-10-18 2018-11-22 2019-05-21 Responsable Financier et Implementation Selection Administratif pour le PMNDPE CI-PMNDPE-72656-CS-INDV Individual / Recrutement d'une Pending IDA / 61740 Project management Post Consultant Limited 15,000.00 0.00 2018-08-30 2018-09-04 2018-09-25 2018-10-30 2019-04-28 Assistante Administrative Implementation Selection pour le PMNDPE CI-PMNDPE-72660-CS-INDV Individual Pending / Recrutement de deux (02) IDA / 61740 Project management Post Consultant Limited 17,000.00 0.00 2018-08-16 2018-08-31 2018-09-21 2018-10-11 2019-10-11 Implementation Chauffeurs pour le PMNDPE Selection CI-PMNDPE-72661-CS-INDV / Recrutement d'un Individual Consultant pour le Nutrition governance and Pending IDA / 61740 Post Consultant Limited 55,000.00 0.00 2018-09-07 2018-09-22 2018-10-13 2018-11-17 2019-05-16 dévéloppement des outils de management Implementation Selection gestion du CNN (politique de gestion des conflits) CI-PMNDPE-72662-CS-INDV / Recrutement d'un consultant en vue de soutenir Individual Early child nutrition and Pending l'élaboration des textes IDA / 61740 Post Consultant Limited 36,000.00 0.00 2018-08-30 2018-09-14 2018-10-05 2018-11-02 2019-01-01 development interventions Implementation règlementant la vente des Selection aliments et boissons pour enfants et adolescents CI-PMNDPE-72664-CS-INDV / Recrutement d'un consultant Individual en vue d'élaborer le document Nutrition governance and Pending IDA / 61740 Post Consultant Limited 40,000.00 0.00 2018-08-30 2018-09-13 2018-10-04 2018-10-19 2018-12-18 de plaidoyer pour la création management Implementation Selection d'un fonds national de nutrition CI-PMNDPE-72666-CS-INDV / Recrutement d'un Consultant en vue de soutenir Individual l'élaboration des documents Pending IDA / 61740 Project management Post Consultant Limited 10,000.00 0.00 2018-08-30 2018-09-13 2018-10-04 2018-10-29 2019-10-29 de plaidoyer et participer aux Implementation Selection conférences PIP pour la mobilisation des ressources domestiques CI-PMNDPE-72667-CS-INDV / Recrutement d'un Individual Consultant en vue de réaliser Nutrition governance and Pending IDA / 61740 Post Consultant Limited 6,000.00 0.00 2018-08-30 2018-09-13 2018-10-04 2018-10-24 2018-12-08 une étude de faisabilité pour management Implementation Selection le recrutement à la fonction publique des nutritionnistes Page 8 CI-PMNDPE-72669-CS-CDS / Recrutement d'un Consultant pour la finalisation du Early child nutrition and Pending IDA / 61740 Post Direct Selection Direct 40,000.00 0.00 2018-08-30 2018-09-09 2018-10-20 2019-04-18 document FRANCS et development interventions Implementation élaboration de la stratégie de mobilisation communautaire CI-PMNDPE-72674-CS-INDV / Recrutement d'un consultant pour la réalisation d'une étude Individual sur les synergies Pending IDA / 61740 Project management Post Consultant Limited 10,000.00 0.00 2018-08-30 2018-09-13 2018-09-28 2018-10-22 2018-12-06 opérationnelles des projets Implementation Selection sectoriels de la Banque Mondiale en Côte d'Ivoire avec le PMNDPE CI-PMNDPE-110691-CS- INDV / Recrutement d'un Individual Nutrition governance and Pending consultant pour l'élaboration IDA / 61740 Post Consultant Limited 50,000.00 0.00 2015-11-10 2015-11-15 2015-12-06 2016-01-10 2016-07-08 management Implementation du manuel de formation des Selection AEL et des Communautés CI-PMNDPE-110663-CS- INDV / Recrutement d'un consultant pour élaborer les Individual manuels de formation du Nutrition governance and Pending IDA / 61740 Post Consultant Limited 60,000.00 0.00 2015-01-10 2015-01-15 2015-02-05 2015-03-12 2015-09-08 Corps préfectoral, collectivités management Implementation Selection locales, des Directions régionales des secteurs, des prestataires de services CI-PMNDPE-110688-CS- INDV / Recrutement d'un consultant pour l'élaboration et la validation du manuel/Guide National Individual Nutrition governance and Pending d'éducation parentale pour le IDA / 61740 Post Consultant Limited 80,000.00 0.00 2015-12-17 2015-12-22 2016-01-12 2016-02-16 2016-08-14 management Implementation DPE et le guide de formation Selection des facilitateurs du programme d'éducation parentale s'inspirant du Manuel National CI-PMNDPE-110689-CS- INDV / Recrutement d'un Individual Nutrition governance and Pending consultant pour développer le IDA / 61740 Post Consultant Limited 30,000.00 0.00 2016-01-07 2016-01-12 2016-02-02 2016-03-08 2016-09-04 management Implementation paquet minimum des activités Selection (nutrition et DPE) CI-PMNDPE-110690-CS- INDV / Recrutement de deux consultants (un consultant international et un consultant Individual Nutrition governance and Pending national) pour développer la IDA / 61740 Post Consultant Limited 110,000.00 0.00 2015-12-15 2015-12-20 2016-01-10 2016-02-14 2016-08-12 management Implementation Stratégie de communication Selection pour le changement social et de comportements + Plan opérationnel CI-PMNDPE-110693-CS- INDV / Recrutement d'un consultant pour l'élaboration Individual d'un manuel de procédures Nutrition governance and Pending IDA / 61740 Post Consultant Limited 30,000.00 0.00 2015-11-10 2015-11-15 2015-12-06 2016-01-10 2016-07-08 intégrées d'acquisition des management Implementation Selection intrants nutritionnels (ATPE, matériels anthropométriques et autres intrants) CI-PMNDPE-110695-CS- INDV / Recrutement d'un consultant pour la réalisation Individual de la cartographie des Nutrition governance and Pending IDA / 61740 Post Consultant Limited 60,000.00 0.00 2015-01-10 2015-01-15 2015-02-05 2015-03-12 2015-09-08 intervenants et des management Implementation Selection interventions en développement de la petite enfance CI-PMNDPE-110696-CS- INDV / Recrutement d'un Individual consultant pour l'élaboration Nutrition governance and Pending IDA / 61740 Post Consultant Limited 100,000.00 0.00 2015-12-17 2015-12-22 2016-01-12 2016-02-16 2016-08-14 et la mise en œuvre le Plan de management Implementation Selection communication institutionnelle du projet CI-PMNDPE-110675-CS- INDV / Recrutement des Individual Pending membres des équipes IDA / 61740 Project management Post Consultant Limited 50,000.00 0.00 2016-01-07 2016-01-12 2016-02-02 2016-03-08 2016-09-04 Implementation régionales (Points focaux, Selection comptables) CI-PMNDPE-110694-CS- Individual INDV / Recrutement d'un Nutrition governance and Pending IDA / 61740 Post Consultant Limited 100,000.00 0.00 2015-12-15 2015-12-20 2016-01-10 2016-02-14 2016-08-12 consultant pour la réalisation management Implementation Selection d'une enquête primaire Genre CI-PMNDPE-110681-CS- INDV / Recrutement d'un Individual Pending consultant pour l'élaboration IDA / 61740 Project management Post Consultant Limited 60,000.00 0.00 2018-11-20 2018-11-25 2018-12-16 2019-01-20 2019-07-19 Implementation du cadre de suivi et évaluation Selection du PMNDPE CI-PMNDPE-110683-CS- INDV / Recrutement des Individual assistants aux spécialistes au Pending IDA / 61740 Project management Post Consultant Open 48,000.00 0.00 2019-01-17 2019-03-05 2019-03-26 2019-04-30 2019-10-27 PMNDPE (Assistants en PM, Implementation Selection Suivi et évaluation et assistant comptable) CI-PMNDPE-110677-CS- INDV / Recrutement d'un Individual consultant pour la Pending IDA / 61740 Project management Post Consultant Limited 40,000.00 0.00 2019-02-18 2019-02-24 2019-03-17 2019-04-21 2019-10-18 révision/actualisation du Implementation Selection manuel de mise en œuvre (PIM) Page 9 CI-PMNDPE-124095-CS- INDV / RECRUTEMENT D’UN CONSULTANT POUR L’ÉLABORATION ET LA VALIDATION DU MANUEL/GUIDE NATIONAL Individual Nutrition governance and Pending D’ÉDUCATION PARENTALE IDA / 61740 Post Consultant Limited 80,000.00 0.00 2019-07-22 2019-07-27 2019-08-17 2019-09-21 2020-03-19 management Implementation POUR LE DPE ET LE GUIDE DE Selection FORMATION DES FACILITATEURS DU PROGRAMME D’ÉDUCATION PARENTALE S’INSPIRANT DU MANUEL NATIONAL CI-PMNDPE-124103-CS-CDS / RECRUTEMENT D’UN CONSULTANT POUR LA FINALISATION DU GUIDE Nutrition governance and Pending IDA / 61740 Post Direct Selection Direct 140,000.00 0.00 2019-07-22 2019-08-01 2019-10-05 2020-04-02 FRANC ET L’ÉLABORATION DE management Implementation LA STRATÉGIE DE MOBILISATION COMMUNAUTAIRE CI-PMNDPE-124110-CS- INDV / RECRUTEMENT D’UN Individual CONSULTANT POUR Nutrition governance and Pending IDA / 61740 Post Consultant Limited 30,000.00 0.00 2019-07-22 2019-07-27 2019-08-17 2019-09-21 2020-03-19 DÉVELOPPER LE PAQUET management Implementation Selection MINIMUM DES ACTIVITÉS (NUTRITION ET DPE) CI-PMNDPE-124111-CS- INDV / RECRUTEMENT DE DEUX CONSULTANTS (UN CONSULTANT INTERNATIONAL ET UN Individual CONSULTANT NATIONAL) Nutrition governance and Pending IDA / 61740 Post Consultant Limited 168,000.00 0.00 2019-07-22 2019-07-27 2019-08-17 2019-09-21 2020-03-19 POUR DÉVELOPPER LA management Implementation Selection STRATÉGIE DE COMMUNICATION POUR LE CHANGEMENT SOCIAL ET DE COMPORTEMENTS + PLAN OPÉRATIONNEL CI-PMNDPE-124114-CS- INDV / RECRUTEMENT D’UN CONSULTANT POUR ÉLABORER LES MANUELS DE Individual Nutrition governance and Pending FORMATION DU CORPS IDA / 61740 Post Consultant Limited 60,000.00 0.00 2019-07-22 2019-07-27 2019-08-17 2019-09-21 2020-03-19 management Implementation PRÉFECTORAL, COLLECTIVITÉS Selection LOCALES, DES DIRECTIONS RÉGIONALES DES SECTEURS, DES PRESTATAIRES DE SERVICES CI-PMNDPE-124115-CS- INDV / RECRUTEMENT D’UN Individual CONSULTANT POUR Nutrition governance and Pending IDA / 61740 Post Consultant Limited 50,000.00 0.00 2019-07-22 2019-07-27 2019-08-17 2019-09-21 2020-03-19 L’ÉLABORATION DU MANUEL management Implementation Selection DE FORMATION DES AEL ET DES COMMUNAUTÉS CI-PMNDPE-124119-CS- INDV / RECRUTEMENT D’UN CONSULTANT POUR L’ÉLABORATION D’UN MANUEL DE PROCÉDURES Individual Nutrition governance and Pending INTÉGRÉES D'ACQUISITION IDA / 61740 Post Consultant Limited 30,000.00 0.00 2019-08-30 2019-09-04 2019-09-25 2019-10-30 2020-04-27 management Implementation DES INTRANTS Selection NUTRITIONNELS (ATPE, MATÉRIELS ANTHROPOMÉTRIQUES ET AUTRES INTRANTS) CI-PMNDPE-124122-CS- INDV / RECRUTEMENT D’UN Individual Nutrition governance and Pending CONSULTANT POUR LA IDA / 61740 Post Consultant Limited 100,000.00 0.00 2019-08-15 2019-08-20 2019-09-10 2019-10-15 2020-04-12 management Implementation RÉALISATION D’UNE ENQUÊTE Selection PRIMAIRE GENRE CI-PMNDPE-124123-CS- INDV / RECRUTEMENT D’UN CONSULTANT POUR LA RÉALISATION DE LA Individual Nutrition governance and Pending CARTOGRAPHIE DES IDA / 61740 Post Consultant Limited 60,000.00 0.00 2019-07-22 2019-07-27 2019-08-17 2019-09-21 2020-03-19 management Implementation INTERVENANTS ET DES Selection INTERVENTIONS EN DÉVELOPPEMENT DE LA PETITE ENFANCE CI-PMNDPE-124137-CS- INDV / RECRUTEMENT DES Individual Pending MEMBRES DES ÉQUIPES IDA / 61740 Project management Post Consultant Open 50,000.00 0.00 2019-07-22 2019-09-09 2019-09-30 2019-11-04 2020-05-02 Implementation RÉGIONALES (POINTS Selection FOCAUX, COMPTABLES) CI-PMNDPE-124141-CS- INDV / RECRUTEMENT D’UN Individual CONSULTANT POUR LA Pending IDA / 61740 Project management Post Consultant Limited 40,000.00 0.00 2019-07-31 2019-08-05 2019-08-26 2019-09-30 2020-03-28 RÉVISION/ACTUALISATION DU Implementation Selection MANUEL DE MISE EN ŒUVRE (PIM) CI-PMNDPE-124144-CS- INDV / RECRUTEMENT D’UN Individual CONSULTANT POUR Pending IDA / 61740 Project management Post Consultant Limited 60,000.00 0.00 2019-07-22 2019-07-27 2019-08-17 2019-09-21 2020-03-19 L’ÉLABORATION DU CADRE DE Implementation Selection SUIVI ET ÉVALUATION DU PMNDPE CI-PMNDPE-124147-CS- INDV / RECRUTEMENT DES Individual ASSISTANTS AUX SPÉCIALISTES Pending IDA / 61740 Project management Post Consultant Open 48,000.00 0.00 2019-07-22 2019-09-09 2019-09-30 2019-11-04 2020-05-02 AU PMNDPE (ASSISTANTS EN Implementation Selection PM, SUIVI ET ÉVALUATION ET ASSISTANT COMPTABLE) CI-PMNDPE-124148-CS- Individual INDV / RECRUTEMENT D’UN Pending IDA / 61740 Project management Post Consultant Limited 16,000.00 0.00 2019-08-15 2019-08-20 2019-09-10 2019-10-15 2020-04-12 COMPTABLE PRINCIPAL POUR Implementation Selection LE PMNDPE Page 10 CI-PMNDPE-124149-CS- Individual INDV / RECRUTEMENT D’UN Pending IDA / 61740 Project management Post Consultant Limited 48,000.00 0.00 2019-08-15 2019-08-20 2019-09-10 2019-10-15 2020-04-12 SECOND ASSISTANT Implementation Selection COMPTABLE POUR LE PMNDPE CI-PMNDPE-139154-CS- Individual Pending INDV / Sélection d’un IDA / 61740 Project management Post Consultant Open 12,000.00 0.00 2019-11-20 2020-01-08 2020-01-29 2020-03-04 2020-08-31 Implementation infographiste pour le PMNDPE Selection CI-PMNDPE-139158-CS- Individual INDV / Sélection d’un Pending IDA / 61740 Project management Post Consultant Open 12,000.00 0.00 2019-10-31 2019-12-19 2020-01-09 2020-02-13 2020-08-11 informaticien archiviste pour Implementation Selection l’UGP PMNDPE CI-PMNDPE-139160-CS- Individual INDV / Sélection d’un Pending IDA / 61740 Project management Post Consultant Open 7,200.00 0.00 2019-11-28 2020-01-16 2020-02-06 2020-03-12 2020-09-08 reprographe pour l’UGP Implementation Selection PMNDPE CI-PMNDPE-72598-CS-INDV Individual / Recrutement d'un Pending IDA / 61740 Project management Post Consultant Open 55,000.00 0.00 2018-08-23 2018-10-11 2018-10-13 2018-10-15 2019-10-15 Responsable Administratif et Implementation Selection Financier pour le PMNDPE CI-PMNDPE-72653-CS-INDV Individual / Recrutement d'un Spécialiste Pending IDA / 61740 Project management Post Consultant Open 55.00 0.00 2018-08-16 2018-09-14 2018-09-21 2018-10-08 2019-10-08 en Passation de Marchés pour Implementation Selection le PMNDPE CI-PMNDPE-72654-CS-INDV Individual / Recrutement d'un Spécialiste Pending IDA / 61740 Project management Post Consultant Open 55,000.00 0.00 2018-08-16 2018-09-19 2018-09-29 2018-10-30 2019-10-30 Suivi-Evaluation pour le Implementation Selection PMNDPE CI-PMNDPE-72655-CS-INDV Individual Pending / Recrutement d'un IDA / 61740 Project management Post Consultant Open 24,000.00 0.00 2018-08-16 2018-09-14 2018-09-24 2018-10-20 2019-10-20 Implementation Comptable pour le PMNDPE Selection CI-PMNDPE-72592-CS-INDV / Recrutement d'un Individual Responsable chargé de Pending IDA / 61740 Project management Post Consultant Open 40,000.00 0.00 2018-09-02 2018-10-21 2018-10-26 2018-11-19 2019-11-19 Communication pour le Implementation Selection changement social et de comportement CI-PMNDPE-234378-CS- INDV / Recrutement d'un consultant individuel international en Individual Early child nutrition and Pending Communication pour le IDA / 61740 Post Consultant Limited 90,000.00 0.00 2021-06-18 2021-06-23 2021-07-14 2021-08-18 2022-02-14 development interventions Implementation Changement Social et de Selection Comportement (CCSC) pour le développement de supports complémentaires multimédias CI-PMNDPE-234380-CS- Individual INDV / Recrutement d'un Early child nutrition and Pending IDA / 61740 Post Consultant Limited 50,000.00 0.00 2021-06-18 2021-06-23 2021-07-14 2021-08-18 2022-02-14 consultant pour la revue à mi- development interventions Implementation Selection parcours du projet CI-PMNDPE-234450-CS- Individual INDV / Recrutement de deux Early child nutrition and Pending IDA / 61740 Post Consultant Limited 16,800.00 0.00 2021-06-25 2021-06-30 2021-07-21 2021-08-25 2022-02-21 (02) assistants (es) development interventions Implementation Selection comptables du PMNDPE CI-PMNDPE-234452-CS- Individual INDV / Recrutement d'un Early child nutrition and Pending IDA / 61740 Post Consultant Limited 7,200.00 0.00 2021-06-18 2021-06-23 2021-07-14 2021-08-18 2022-02-14 technicien reprographe pour development interventions Implementation Selection le PMNDPE CI-PMNDPE-234401-CS-CDS / Recrutement d'un Cabinet en vue du renforcement du Early child nutrition and Pending SISE et passer à la version 2.0 IDA / 61740 Post Direct Selection Direct 80,000.00 0.00 2021-06-30 2021-07-10 2021-09-13 2022-03-12 development interventions Implementation (Volet cartographie, Finance et collecte mobile au niveau FRANC) CI-PMNDPE-234385-CS- INDV / Recrutement d'un Individual Early child nutrition and Pending consultant pour l'appui à IDA / 61740 Post Consultant Open 150,000.00 0.00 2021-06-18 2021-08-06 2021-08-27 2021-10-01 2022-03-30 development interventions Implementation l'élaboration du nouveau plan Selection multisectoriel (PNMN2) CI-PMNDPE-234435-CS- INDV / Recrutement d'un Individual consultant pour la réalisation Early child nutrition and Pending IDA / 61740 Post Consultant Open 90,000.00 0.00 2021-05-31 2021-07-19 2021-08-09 2021-09-13 2022-03-12 de l'audit de mise en development interventions Implementation Selection conformité environnementale et sociale du PMNDPE Page 11 PROCUREMENT PLAN (Textual Part) Project information: Mozambique Cyclone Emergency Recovery Project (P171040) Project Implementation agency: (i) Water and Sanitation Infrastructure Administration and (ii) Idai Post Cyclone Reconstruction Cabinet Date of the Procurement Plan: December 15, 2019 Period covered by this Procurement Plan: December 15, 2019 – June 30, 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Mozambique Procurement Regulations, Decree 5/2016 of March 8, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables; Hands-on Expanded Implementation Support (HEIS): Not Applicable PROCUREMENT Mozambique : Mozambique: Cyclone Idai & Kenneth Emergency Recovery and Resilience Project PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2020-04-27 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171040 GPN Date: 2020-07-27 Project Name: Mozambique: Cyclone Idai & Kenneth Emergency Recovery and Resilience Project Loan / Credit No: IDA / D5190 M Executing Agency(ies): inistry of Health WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-MISAU-170693-GO-DIR Contingent Emergency / Acquisition of medical IDA / D5190 Post Direct Selection Direct 3,610,611.95 Completed 2020-04-27 2020-05-07 2020-05-04 2020-05-07 2020-05-07 2020-05-07 2020-11-03 2021-03-25 Response Component (CERC) equipment under COVID-19 MZ-MISAU-171799-GO-DIR Contingent Emergency / Acquisition of PPE material - IDA / D5190 Post Direct Selection Direct 2,297,750.53 Completed 2020-05-04 2020-05-04 2020-05-09 2020-05-04 2020-06-13 2020-05-14 2020-09-30 2020-05-14 Response Component (CERC) First acquisition MZ-MISAU-174248-GO-DIR / Purchase of personal Contingent Emergency IDA / D5190 Post Direct Selection Direct 4,425,575.00 Completed 2020-05-18 2020-06-13 2020-05-23 2020-06-13 2020-06-27 2020-06-24 2020-12-24 2021-01-22 protective equipment at Response Component (CERC) MEHECO MZ-MISAU-174252-GO-DIR / Purchase of Disposable Contingent Emergency Protective Coverall for Medical IDA / D5190 Post Direct Selection Direct 3,136,000.00 Completed 2020-05-20 2020-07-02 2020-05-25 2020-08-01 2020-06-29 2020-08-03 2020-12-26 2021-01-08 Response Component (CERC) Use, Single use, disposable. (Sterile) MZ-MISAU-174253-GO-DIR Contingent Emergency Request for Single Stage - One / Purchase of fabric masks for IDA / D5190 Post Open - National 0.00 Canceled 2020-05-29 2020-07-24 2021-01-20 Response Component (CERC) Quotations Envelope vulnerable populations MZ-MISAU-174254-GO-RFQ Under Contingent Emergency Request for Single Stage - One / Purchase of harvest material IDA / D5190 Post Limited 95,764.76 Implementati 2020-05-25 2020-04-08 2020-07-20 2021-01-16 Response Component (CERC) Quotations Envelope for the INS laboratory on MZ-MISAU-181960-GO-UN / FOR PROCUREMENT OF Contingent Emergency UN Agencies IDA / D5190 Post Direct 697,034.00 Completed 2020-06-28 2020-07-03 2020-07-03 2020-07-03 2020-07-19 2020-07-06 2020-09-30 2021-04-08 LABORATORY REAGENTS AND Response Component (CERC) (Direct) CONSUMABLES MZ-MISAU-185688-GO-DIR / Offer for six (6) products from Commander Health Contingent Emergency IDA / D5190 Post Direct Selection Direct 4,095,000.00 Completed 2020-07-27 2020-07-27 2020-07-28 2020-07-28 2020-07-30 2020-07-29 2020-09-20 2021-02-10 Supply, a US-based healthcare Response Component (CERC) supply company based in Bronxville, New York MZ-MISAU-174251-GO-DIR / Purchase of 250.000 Contingent Emergency IDA / D5190 Post Direct Selection Direct 0.00 Canceled 2020-05-19 2020-05-24 2020-06-28 2020-12-25 surgical gowns, single-use, Response Component (CERC) disposable (Sterile). MZ-MISAU-231028-GO-RFQ Pending / Purchase of sample Contingent Emergency Request for Single Stage - One IDA / D5190 Post Limited 0.00 Implementati 2021-04-30 2021-06-04 2021-12-01 collection material, including Response Component (CERC) Quotations Envelope on swabs MZ-MISAU-236605-GO-RFQ Pending Contingent Emergency Request for Single Stage - One / Purchase of Tablets (1 x IDA / D5190 Post Limited 0.00 Implementati 2021-06-05 2021-07-31 2021-09-30 Response Component (CERC) Quotations Envelope Team x 328 per Unit) on MZ-MISAU-236610-GO-RFQ / Personal Protective Pending Contingent Emergency Request for Single Stage - One Equipment (Masks, Visors, IDA / D5190 Post Limited 0.00 Implementati 2021-06-06 2021-08-01 2021-10-31 Response Component (CERC) Quotations Envelope Smocks, Cotton Rolls, on Disinfectant Bottle (2L)) MZ-MISAU-236603-GO-RFQ Pending / Purchase of complete Contingent Emergency Request for Single Stage - One IDA / D5190 Post Limited 0.00 Implementati 2021-06-04 2021-07-30 2021-09-30 vaccination stamps (1 x Team Response Component (CERC) Quotations Envelope on 1x $ 25.86) MZ-MISAU-236608-GO-RFQ Pending / Infrared thermometers (1 / Contingent Emergency Request for Single Stage - One IDA / D5190 Post Limited 0.00 Implementati 2021-06-05 2021-07-31 2021-09-30 Vaccine Team x $ 43.1 per Response Component (CERC) Quotations Envelope on Unit per team) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-MISAU-181957-NC-UN / Contingent Emergency UN Agencies FOR TRANSPORT SERVICES IDA / D5190 Post Direct 1,032,103.85 Completed 2020-07-19 2020-07-08 2020-07-24 2020-07-08 2020-07-26 2020-07-17 2020-07-31 2021-01-11 Response Component (CERC) (Direct) FOR PROCURED SUPPLIES Page 1 MZ-MISAU-236600-NC-RFQ Under Contingent Emergency Single Stage - One / Reproduction of vaccination IDA / D5190 Post Request for Bids Open - National 0.00 Implementati 2021-05-31 2021-06-15 2021-06-05 2021-06-15 2021-07-17 2021-08-16 2021-09-20 2021-10-31 Response Component (CERC) Envelope cards on MZ-MISAU-236598-NC-RFQ Pending / Printing of records and Contingent Emergency Single Stage - One IDA / D5190 Post Request for Bids Open - National 0.00 Implementati 2021-06-01 2021-06-06 2021-07-18 2021-08-17 2021-09-21 2021-10-31 physical record (vaccination Response Component (CERC) Envelope on and surveillance of EAPV) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-MISAU-231026-NC-RFQ Consultant Contingent Emergency Pending / Audit external to the IDA / D5190 Post Qualification Limited 0.00 2021-05-30 2021-06-04 2021-06-11 2021-07-05 2021-12-14 Response Component (CERC) Implementation activities of the Project Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Bolivia P127743 - BO Rural Alliances Project II Procurement Plan PROCUREMENT Bolivia : Rural Alliances Project II PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2017-08-17 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P127743 GPN Date: Project Name: Rural Alliances Project II Loan / Credit No: IDA / 51700, IBRD / 87350 EMPODERAR Program Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Loan / Credit Market Procurement Prequalificatio High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / Report and Signed Contract No. Approach Process n (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planne d GOODS Activity Reference No. / Estimated Draft Pre- Draft Bidding Bid Evaluation Loan / Credit Market Procurement Prequalificatio Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method Amount qualification Document / Report and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes (US$) Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned Actual BO-EMPODERAR-57722- GO-RFQ / Adquisicion mobiliario para la UNidad Implementation of Rural Request for Single Stage - One 2018-08- 2018-10- 2019-03- de Coordinacion Nacional y IBRD / 87350 Post Open - National 25,000.00 0.00 Canceled Alliances Quotations Envelope 06 01 30 las unidades operativas departaemntales (escritorios, sillas, gaveteros y otros BO-EMPODERAR-57477- GO-RFB / Adquisicion 13 Implementation of Rural Request for Single Stage - One 2018-05- 2018-07- 2018-07- 2019-01- 2018-08- IBRD / 87350 Post Open - National 48,633.00 23,328.51 Completed equipos portatiles y 13 Alliances Quotations Envelope 13 08 18 04 02 esquipos integrados todo en uno BO-EMPODERAR-57753- Implementation of Rural Request for Single Stage - One 2018-08- 2018-10- 2018-12- 2019-03- 2018-12- IBRD / 87350 Post Open - National 12,000.00 17,193.34 Completed GO-RFQ / Equipo de Alliances Quotations Envelope 06 01 03 30 27 telefonía BO-EMPODERAR-57743- Implementation of Rural Request for Single Stage - One 2018-08- 2018-10- 2019-12- 2019-03- 2019-12- GO-RFQ / Aire IBRD / 87350 Post Open - National 14,400.00 4,670.53 Completed Alliances Quotations Envelope 06 01 13 30 16 acondicionado y calefacción BO-EMPODERAR-57742- Implementation of Rural Request for Single Stage - One 2018-08- 2018-10- 2019-03- IBRD / 87350 Post Open - National 15,000.00 0.00 Canceled GO-RFQ / Data show Alliances Quotations Envelope 06 01 30 BO-EMPODERAR-57481- Implementation of Rural Request for Single Stage - One 2018-08- 2018-10- 2019-03- GO-RFQ / Equipo de IBRD / 87350 Post Open - National 38,000.00 0.00 Canceled Alliances Quotations Envelope 06 01 30 monitoreo - GPS tablets BO-EMPODERAR-57798- GO-RFQ / Adquisicion fotocopiadoras para la Implementation of Rural Request for Single Stage - One 2018-05- 2018-07- 2018-06- 2019-01- 2018-07- IBRD / 87350 Post Open - National 29,504.00 24,196.82 Completed Unidad de Coordinacion Alliances Quotations Envelope 13 08 22 04 07 Nacional y las unidades operativas departamentales BO-EMPODERAR-57837- GO-RFQ / Impresoras: para Implementation of Rural Request for Single Stage - One 2018-05- 2018-07- 2018-06- 2019-01- 2018-07- IBRD / 87350 Post Open - National 4,964.00 4,196.82 Completed las unidades operativas Alliances Quotations Envelope 13 08 22 04 07 departamentales BO-EMPODERAR-62139- GO-RFQ / Escaners para la Implementation of Rural Request for Single Stage - One 2018-05- 2018-07- 2018-07- 2019-01- 2018-08- Unidad de Coordinacion IBRD / 87350 Post Open - National 33,079.00 24,733.72 Completed Alliances Quotations Envelope 14 09 18 05 02 Nacional y para las Unidades Operativas Departamentales BO-EMPODERAR-57724- Implementation of Rural Single Stage - One 2018-06- 2019-08- 2018-07- 2018-08- 2019-08- 2018-09- 2019-09- 2018-10- 2019-10- 2019-04- 2019-11- GO-RFB / Vehículos: 13 IBRD / 87350 Post Request for Bids Open - National 435,500.00 387,094.93 Completed Alliances Envelope 29 27 04 15 27 14 02 19 08 17 13 camionetas doble cabina 4x4 BO-EMPODERAR-71947- Implementation of Rural Request for Single Stage - One 2018-08- 2018-09- 2018-09- 2019-03- 2018-09- GO-RFQ / Adquisicion de IBRD / 87350 Post Open - National 20,000.00 15,340.09 Completed Alliances Quotations Envelope 01 26 04 25 04 licencias office 365 BO-EMPODERAR-78413- GO-RFQ / Silla para la Request for Single Stage - One 2018-09- 2018-11- 2019-05- IBRD / 87350 Institutional Strengthening Post Open - National 412.53 0.00 Canceled oficina de capacitacion y Quotations Envelope 22 17 16 asistencia tecnica BO-EMPODERAR-83394- GO-RFQ / 4 Equipos de Request for Single Stage - One 2018-10- 2018-12- 2018-10- 2019-06- 2018-10- IBRD / 87350 Institutional Strengthening Post Open - National 2,385.00 2,367.85 Completed Aire Acondicionado para la Quotations Envelope 27 22 31 20 31 UOD PANDO BO-EMPODERAR-83539- Request for Single Stage - One 2018-10- 2018-12- 2018-12- 2019-06- 2018-12- GO-RFQ / Impresion IBRD / 87350 Institutional Strengthening Post Open - National 42,580.00 38,415.64 Completed Quotations Envelope 28 23 06 21 20 material de capacitacion BO-EMPODERAR-83540- GO-RFQ / Señaleticas Request for Single Stage - One 2018-10- 2018-12- 2018-12- 2019-06- 2018-12- IBRD / 87350 Institutional Strengthening Post Open - National 940.00 1,681.39 Completed internas, extermas y para Quotations Envelope 28 23 11 21 11 todas las UOD´s BO-EMPODERAR-83541- GO-RFQ / Elaboracion de Request for Single Stage - One 2018-10- 2018-12- 2019-06- IBRD / 87350 Institutional Strengthening Post Open - National 500.00 0.00 Canceled credenciales para la UOD La Quotations Envelope 28 23 21 Paz BO-EMPODERAR-85337- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2018-12- 2019-06- 2018-12- GO-RFB / Adquisición IBRD / 87350 Post Open - National 13,681.00 11,428.67 Completed Monitoring and Evaluation Quotations Envelope 05 31 14 29 24 mobiliario UOD Chuquisaca BO-EMPODERAR-85338- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2018-12- 2019-06- 2018-12- GO-RFB / Adquisición IBRD / 87350 Post Open - National 6,588.00 4,110.07 Completed Monitoring and Evaluation Quotations Envelope 05 31 14 29 19 mobiliario UOD Pando BO-EMPODERAR-85339- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2019-06- GO-RFB / Adquisición IBRD / 87350 Post Open - National 2,114.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 05 31 29 mobiliario UOD Tarija BO-EMPODERAR-85340- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2019-06- GO-RFB / Adquisición IBRD / 87350 Post Open - National 1,575.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 05 31 29 mobiliario UOD Cochabamba BO-EMPODERAR-85341- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2019-06- GO-RFB / Adquisición IBRD / 87350 Post Open - National 3,681.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 05 31 29 mobiliario UOD Santa Cruz BO-EMPODERAR-85342- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2018-12- 2019-06- 2018-12- GO-RFB / Adquisición IBRD / 87350 Post Open - National 14,468.00 13,138.31 Completed Monitoring and Evaluation Quotations Envelope 05 31 21 29 21 mobiliario UOD Beni BO-EMPODERAR-85343- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2018-12- 2019-06- 2018-12- GO-RFB / Adquisición IBRD / 87350 Post Open - National 11,735.00 10,473.45 Completed Monitoring and Evaluation Quotations Envelope 05 31 03 29 18 equipos de computación BO-EMPODERAR-85344- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2019-06- GO-RFB / Adquisición IBRD / 87350 Post Open - National 17,756.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 05 31 29 equipos de comunicación BO-EMPODERAR-85347- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2018-12- 2019-06- 2018-12- IBRD / 87350 Post Open - National 19,396.00 18,842.14 Completed GO-RFB / Adquisición Monitoring and Evaluation Quotations Envelope 05 31 03 29 28 proyectores BO-EMPODERAR-85348- Project Management, Request for Single Stage - One 2018-11- 2018-12- 2019-06- GO-RFB / Adquisición kids IBRD / 87350 Post Open - National 2,618.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 05 31 29 para análisis de agua BO-EMPODERAR-85349- GO-RFQ / Adquisición Project Management, Request for Single Stage - One 2018-11- 2018-12- 2019-06- IBRD / 87350 Post Open - National 413.00 0.00 Canceled sillón de escritorio para la Monitoring and Evaluation Quotations Envelope 05 31 29 Unidad de Comunicación BO-EMPODERAR-85517- Project Management, Request for Single Stage - One 2018-11- 2019-01- 2018-12- 2019-06- 2018-12- GO-RFQ / Adquisición kids IBRD / 87350 Post Open - National 7,854.00 7,629.07 Completed Monitoring and Evaluation Quotations Envelope 06 01 12 30 12 para análisis de agua BO-EMPODERAR-86077- Project Management, Request for Single Stage - One 2018-11- 2019-01- 2019-07- GO-RFQ / Provisión de IBRD / 87350 Post Open - National 11,735.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 11 06 05 equipos de computación BO-EMPODERAR-98385- Project Management, Request for Single Stage - One 2019-02- 2019-04- 2019-09- GO-RFQ / Adquisición IBRD / 87350 Post Open - National 34,111.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 06 03 30 equipos de computación BO-EMPODERAR-98389- GO-RFQ / Actualización de Project Management, Request for Single Stage - One 2019-02- 2019-04- 2019-09- 2019-09- 2019-09- IBRD / 87350 Post Open - National 17,639.00 15,280.52 Completed software de los equipos de Monitoring and Evaluation Quotations Envelope 06 03 20 30 30 computación del PAR II BO-EMPODERAR-112011- Request for Single Stage - One 2019-04- 2019-06- 2019-05- 2019-12- 2019-05- GO-RFQ / Adquisición IBRD / 87350 Institutional Strengthening Post Open - National 660.00 605.66 Completed Quotations Envelope 30 25 16 22 30 relojes biométricos BO-EMPODERAR-113156- Implementation of Rural Request for Single Stage - One 2019-05- 2019-07- 2019-06- 2019-12- 2019-07- GO-RFQ / Adquisición IBRD / 87350 Post Open - National 686.00 286.17 Completed Alliances Quotations Envelope 07 02 24 29 09 accesorios para red BO-EMPODERAR-113161- Implementation of Rural Request for Single Stage - One 2019-05- 2019-07- 2019-06- 2019-12- 2019-07- GO-RFQ / Adquisición IBRD / 87350 Post Open - National 25,042.00 19,590.15 Completed Alliances Quotations Envelope 07 02 24 29 09 equipos y accesorios de computación BO-EMPODERAR-113163- GO-RFQ / Adquisición Implementation of Rural Request for Single Stage - One 2019-05- 2019-07- 2019-06- 2019-12- 2019-06- IBRD / 87350 Post Open - National 744.00 1,044.23 Completed unidad fotoconductora para Alliances Quotations Envelope 07 02 24 29 28 impresora BO-EMPODERAR-113166- Implementation of Rural Request for Single Stage - One 2019-05- 2019-07- 2019-06- 2019-12- 2019-06- GO-RFQ / Adquisición IBRD / 87350 Post Open - National 2,979.00 2,470.46 Completed Alliances Quotations Envelope 07 02 24 29 28 equipos de seguridad para redes BO-EMPODERAR-122059- Pending GO-RFQ / Impresión de Request for Single Stage - One 2019-07- 2019-09- 2020-03- IBRD / 87350 Institutional Strengthening Post Open - National 1,457.72 0.00 Implementa plegables de 7 cuerpos Quotations Envelope 15 09 07 tion para el Proyecto de Alianzas Rurales II BO-EMPODERAR-123309- Request for Single Stage - One 2019-07- 2019-09- 2019-09- 2020-03- 2019-10- GO-RFQ / Fabricación de IBRD / 87350 Institutional Strengthening Post Open - National 7,654.00 7,603.19 Completed Quotations Envelope 22 16 02 14 03 letreros de difusión del PAR II La Paz BO-EMPODERAR-123311- GO-RFQ / Fabricación de Request for Single Stage - One 2019-07- 2019-09- 2019-09- 2020-03- 2019-10- IBRD / 87350 Institutional Strengthening Post Open - National 7,654.00 7,603.19 Completed letreros de difusión del PAR Quotations Envelope 22 16 02 14 03 II Cochabamba BO-EMPODERAR-127586- Request for Single Stage - One 2019-08- 2019-10- 2019-08- 2020-04- 2019-08- GO-RFQ / Reloj biometrico IBRD / 87350 Institutional Strengthening Post Open - National 660.00 159.30 Completed Quotations Envelope 21 16 09 13 09 de huella digital BO-EMPODERAR-128527- Request for Single Stage - One 2019-08- 2019-10- 2019-09- 2020-04- 2019-09- GO-RFQ / Renovación de IBRD / 87350 Institutional Strengthening Post Open - National 17,640.00 15,280.52 Completed Quotations Envelope 26 21 20 18 26 licencias Office 365 BO-EMPODERAR-138865- Request for Single Stage - One 2019-10- 2019-12- 2020-06- GO-RFQ / Reloj biometrico IBRD / 87350 Institutional Strengthening Post Open - National 660.00 0.00 Canceled Quotations Envelope 12 07 04 de huella digital BO-EMPODERAR-139202- Request for Single Stage - One 2019-10- 2019-12- 2019-11- 2020-06- 2019-12- GO-RFQ / Adquisición de IBRD / 87350 Institutional Strengthening Post Open - National 8,395.00 8,333.09 Completed Quotations Envelope 13 08 25 05 16 equipos de computación BO-EMPODERAR-188251- NC-RFQ / Adquisición Request for Single Stage - One 2020-08- 2020-10- 2021-04- IBRD / 87350 Institutional Strengthening Post Open - National 25,010.00 0.00 Canceled material de escritorio (toner Quotations Envelope 16 11 09 para impresoras) BO-EMPODERAR-199348- GO-RFQ / Software Project Management, Request for Single Stage - One 2020-10- 2020-12- 2020-10- 2021-06- 2020-10- LICENCIAS MICROSOFT IBRD / 87350 Post Open - National 22,450.00 18,360.03 Completed Monitoring and Evaluation Quotations Envelope 17 12 20 10 23 OFFICE 365 para los equipos de computación del PAR II BO-EMPODERAR-208053- Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- GO-RFQ / Adquisición IBRD / 87350 Institutional Strengthening Post Open - National 46,650.00 35,008.11 Completed Quotations Envelope 08 02 15 01 21 material de escritorio y toner BO-EMPODERAR-208476- GO-RFQ / Adquisición Project Management, Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- equipos de aire IDA / 51700 Post Open - National 3,630.00 3,572.45 Completed Monitoring and Evaluation Quotations Envelope 12 06 16 05 29 acondicionado Unidad Operativa Departamental Pando BO-EMPODERAR-208478- GO-RFQ / Adquisición Project Management, Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- IBRD / 87350 Post Open - National 3,368.00 1,506.15 Completed equipos aire acondicionado Monitoring and Evaluation Quotations Envelope 12 06 22 05 28 Unidad Operativa Regional Chaco BO-EMPODERAR-209259- Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- GO-RFQ / Adquisición de IBRD / 87350 Institutional Strengthening Post Open - National 8,819.00 8,283.85 Completed Quotations Envelope 16 10 23 09 28 mochilas BO-EMPODERAR-209264- Project Management, Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- GO-RFQ / Adquisición de IBRD / 87350 Post Open - National 1,720.00 1,598.84 Completed Monitoring and Evaluation Quotations Envelope 16 10 23 09 31 mobiliario BO-EMPODERAR-210867- Project Management, Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- GO-RFQ / Adquisición IBRD / 87350 Post Open - National 5,831.00 4,734.58 Completed Monitoring and Evaluation Quotations Envelope 23 17 29 16 30 equipos de computación Page 1 BO-EMPODERAR-222141- GO-RFQ / Adquisicion de 2 Project Management, Request for Single Stage - One 2021-03- 2021-05- 2021-03- 2021-10- 2021-03- equipos de aire IBRD / 87350 Post Open - National 1,749.00 1,427.82 Completed Monitoring and Evaluation Quotations Envelope 06 01 26 28 30 acondicionado para la UOD Santa Cruz - Chiquitania BO-EMPODERAR-223632- Request for Single Stage - One 2021-03- 2021-05- 2021-03- 2021-11- 2021-03- IBRD / 87350 Institutional Strengthening Post Open - National 28,810.00 21,930.42 Completed GO-RFQ / Adquisición de Quotations Envelope 13 08 17 04 19 toner BO-EMPODERAR-225635- GO-RFQ / COMPRA DE Request for Single Stage - One 2021-03- 2021-05- 2021-03- 2021-11- 2021-03- IBRD / 87350 Institutional Strengthening Post Open - National 16,060.00 14,343.18 Completed MATERIAL DE ESCRITORIO Quotations Envelope 24 19 29 15 30 PARA EL PROYECTO PAR II BO-EMPODERAR-227083- Pending GO-RFQ / COMPRA DE Implementation of Rural Request for Single Stage - One 2021-04- 2021-05- 2021-11- IBRD / 87350 Post Open - National 1,137.00 0.00 Implementa CAMARAS DE SEGURIDAD Alliances Quotations Envelope 03 29 25 tion PARA LA UOD PANDO DEL PAR II BO-EMPODERAR-227689- GO-RFQ / ADQUISICION DE Implementation of Rural Request for Single Stage - One 2021-04- 2021-06- 2021-04- 2021-11- 2021-04- IBRD / 87350 Post Open - National 1,350.00 896.60 Completed CENTRL TELEFONICA PARA Alliances Quotations Envelope 06 01 20 28 30 LA UOD SANTA CRUZ - PAR II BO-EMPODERAR-227719- GO-RFQ / COMPRA DE EQUIPO DE SONIDO MOVIL Implementation of Rural Request for Single Stage - One 2021-04- 2021-06- 2021-05- 2021-11- 2021-05- PARA DIFUSION DE LOS IBRD / 87350 Post Open - National 1,166.00 645.62 Completed Alliances Quotations Envelope 06 01 21 28 28 RESULTADOS EN FERIAS, TALLERES Y OTROS DEL PROYECTO PAR II BO-EMPODERAR-234026- Pending GO-RFQ / Fabricación de Request for Single Stage - One 2021-05- 2021-07- 2021-11- IBRD / 87350 Institutional Strengthening Post Open - National 42,070.00 0.00 Implementa letreros de difusión del PAR Quotations Envelope 15 10 30 tion II UOD TARIA - CHACO BO-EMPODERAR-234035- Pending GO-RFQ / Fabricación de Request for Single Stage - One 2021-05- 2021-07- 2021-11- IBRD / 87350 Institutional Strengthening Post Open - National 19,960.00 0.00 Implementa letreros de difusión del PAR Quotations Envelope 15 10 30 tion II UOD BENI Y PANDO BO-EMPODERAR-234038- Pending GO-RFQ / Fabricación de Request for Single Stage - One 2021-05- 2021-07- 2021-11- IBRD / 87350 Institutional Strengthening Post Open - National 43,150.00 0.00 Implementa letreros de difusión del PAR Quotations Envelope 15 10 30 tion II UOD POTOSI Y ORURO BO-EMPODERAR-234040- Pending GO-RFQ / Fabricación de Request for Single Stage - One 2021-05- 2021-07- 2021-11- IBRD / 87350 Institutional Strengthening Post Open - National 44,230.00 0.00 Implementa letreros de difusión del PAR Quotations Envelope 15 10 30 tion II UOD CHUQUISACA - COCHABAMBA NON CONSULTING SERVICES Activity Reference No. / Estimated Draft Pre- Draft Bidding Bid Evaluation Loan / Credit Market Procurement Prequalificatio Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method Amount qualification Document / Report and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes (US$) Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned Actual Mail de Jhonny Delgadillo / Promocion de Especialista 2014-11- IDA / 51700 Institutional Strengthening Prior Direct Selection Direct 7,776.00 7,832.13 Signed Financiero, del 7 de 26 noviembre 2014 al 28 de febrero de 2015 Mail de Jhonny Delgadillo solicitando NO / Solicitud de No Objecion para 2015-01- IDA / 51700 Institutional Strengthening Prior Direct Selection Direct 4,559.00 4,584.66 Signed contratar a Oficial de 06 Alianzas de la UOR Valles Sur, con sede en la ciudad de Camargo BO-EMPODERAR-62141- NC-RFQ / Impresión de Implementation of Rural Request for Single Stage - One 2018-05- 2018-07- 2019-01- IBRD / 87350 Post Open - National 49,220.00 0.00 Canceled guías y materiales de Alliances Quotations Envelope 14 09 05 difusión del PARII BO-EMPODERAR-78842- NC-RFQ / Colocado de 50 Request for Single Stage - One 2018-09- 2018-11- 2018-11- 2019-05- 2018-12- letreros de identificación de IBRD / 87350 Institutional Strengthening Post Open - National 18,221.57 17,958.00 Completed Quotations Envelope 24 19 19 18 17 proyectos para la UOD La Paz y la UOD Cochabamba BO-EMPODERAR-78843- NC-RFQ / Colocado de 15 Request for Single Stage - One 2018-09- 2018-11- 2018-11- 2019-05- 2018-12- IBRD / 87350 Institutional Strengthening Post Open - National 5,466.47 4,561.91 Completed letreros de identificación de Quotations Envelope 24 19 07 18 05 proyectos para la UOD Tarija BO-EMPODERAR-78825- NC-RFB / Colocado de 40 Request for Single Stage - One 2018-10- 2018-12- 2018-11- 2019-06- 2018-12- letreros de identificación de IBRD / 87350 Institutional Strengthening Post Open - National 14,577.26 14,482.26 Completed Quotations Envelope 20 15 19 13 20 proyectos para la UOD Santa Cruz y la UOR Chaco BO-EMPODERAR-98396- NC-RFQ / Impresión de Project Management, Request for Single Stage - One 2019-02- 2019-04- 2019-09- IBRD / 87350 Post Open - National 26,240.00 0.00 Canceled formularios y manuales Monitoring and Evaluation Quotations Envelope 06 03 30 (Varios requerimientos) BO-EMPODERAR-98398- NC-RFQ / Impresión de Project Management, Request for Single Stage - One 2019-02- 2019-04- 2019-09- cartillas e instrumentos de IBRD / 87350 Post Open - National 13,557.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 06 03 30 capacitación en riego tecnificado (Varios requerimientos) BO-EMPODERAR-98399- NC-RFQ / Impresión de Project Management, Request for Single Stage - One 2019-02- 2019-04- 2019-09- IBRD / 87350 Post Open - National 17,642.00 0.00 Canceled material de divulgación Monitoring and Evaluation Quotations Envelope 06 03 30 (banners, rollers, afiches y otros) BO-EMPODERAR-115134- NC-RFQ / Impresión Project Management, Request for Single Stage - One 2019-05- 2019-07- 2019-06- 2019-12- 2019-07- IBRD / 87350 Post Open - National 11,650.00 10,861.69 Completed manual integrado de plagas Monitoring and Evaluation Quotations Envelope 06 01 24 28 09 y cartilla de planes de alianza con riego BO-EMPODERAR-115136- NC-RFQ / Impresión manual de adquisiciones y Project Management, Request for Single Stage - One 2019-05- 2019-07- 2019-06- 2019-12- 2019-06- IBRD / 87350 Post Open - National 16,620.00 15,496.02 Completed contrataciones y guía de Monitoring and Evaluation Quotations Envelope 06 01 24 28 27 procedimientos administrativos BO-EMPODERAR-118166- NC-DIR / Contratación de una empresa para prestar apoyo logístico en un taller 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2020-01- 2019-06- IBRD / 87350 Institutional Strengthening Post Direct Selection Direct 5,200.00 5,061.46 Completed de capacitación horizontal e 05 06 10 06 15 06 11 25 intercambio de experiencias entre productores en carpas solares BO-EMPODERAR-134942- Request for Single Stage - One 2019-09- 2019-11- 2019-10- 2020-05- 2019-10- NC-RFQ / Impresión IBRD / 87350 Institutional Strengthening Post Open - National 20,408.00 20,275.16 Completed Quotations Envelope 23 18 17 16 23 Manual Integrado de Plagas BO-EMPODERAR-136077- NC-RFQ / Colocado de letrero del Proyecto de Request for Single Stage - One 2019-10- 2019-11- 2020-05- IBRD / 87350 Institutional Strengthening Post Open - National 5,466.00 0.00 Canceled Alianzas Rurales (PARII) Quotations Envelope 01 26 24 Unidad Operativa Departamental de Cochabamba BO-EMPODERAR-136078- NC-RFQ / Colocado de Request for Single Stage - One 2019-10- 2019-11- 2020-05- letreros del Proyecto de IBRD / 87350 Institutional Strengthening Post Open - National 5,466.00 0.00 Canceled Quotations Envelope 02 27 25 Alianzas Rurales (PARII) Unidad Operativa Departamental La Paz BO-EMPODERAR-136079- GO-RFQ / Impresion de Request for Single Stage - One 2019-10- 2019-11- 2020-05- banners de difusión del PAR IBRD / 87350 Institutional Strengthening Post Open - National 14,548.00 0.00 Canceled Quotations Envelope 02 27 25 II para las Unidades Operativas Departamentales del PAR II BO-EMPODERAR-144688- NC-RFQ / ADQUISICION DE MATERIAL DE ESCRITORIO Request for Single Stage - One 2019-11- 2020-01- 2019-11- 2020-07- 2019-11- IBRD / 87350 Institutional Strengthening Post Open - National 43,560.00 43,274.18 Completed PARA OFICINAS Quotations Envelope 11 06 15 04 19 DEPENDIENTES DEL PAR II DEL PROYECTO PAR II BO-EMPODERAR-144690- Request for Single Stage - One 2019-11- 2020-01- 2019-11- 2020-07- 2019-11- NC-RFQ / ADQUISICION DE IBRD / 87350 Institutional Strengthening Post Open - National 7,960.00 7,907.31 Completed Quotations Envelope 11 06 15 04 19 PAPEL PARA OFICINAS DEL PAR II BO-EMPODERAR-149062- Request for Single Stage - One 2019-12- 2020-02- 2019-12- 2020-08- 2019-12- NC-RFQ / Impresión de IBRD / 87350 Institutional Strengthening Post Open - National 18,149.00 13,112.80 Completed Quotations Envelope 11 05 26 03 27 adhesivos para el PAR II BO-EMPODERAR-153837- NC-RFQ / Contratación Project Management, Request for Single Stage - One 2020-01- 2020-03- 2020-03- 2020-09- 2021-01- IBRD / 87350 Post Open - National 13,630.00 1,042.72 Completed servicio de limpieza de las Monitoring and Evaluation Quotations Envelope 19 15 02 11 15 oficinas del Programa EMPODERAR BO-EMPODERAR-208717- NC-RFQ / COLOCADO DE Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- 15 LETREROS DE IBRD / 87350 Institutional Strengthening Post Open - National 5,470.00 5,409.12 Completed Quotations Envelope 13 07 22 06 30 IDENTIFICACION DE PROYECTOS PARA LA UOD LA PAZ - PROYECTO PAR II BO-EMPODERAR-208719- NC-RFQ / COLOCADO DE 15 LETREROS DE Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- IBRD / 87350 Institutional Strengthening Post Open - National 5,470.00 5,409.12 Completed IDENTIFICACION DE Quotations Envelope 13 07 22 06 30 PROYECTOS PARA LA UOD COCHABAMBA - PROYECTO PAR II BO-EMPODERAR-209265- Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- IBRD / 87350 Institutional Strengthening Post Open - National 10,496.00 8,325.16 Completed NC-RFQ / Adquisición de Quotations Envelope 16 10 29 09 30 papel BO-EMPODERAR-209266- NC-RFQ / Material de Implementation of Rural Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- difusión (folders IBRD / 87350 Post Open - National 14,936.00 11,344.05 Completed Alliances Quotations Envelope 16 10 23 09 29 institucionales, calendarios, afiches y broshures) BO-EMPODERAR-209267- Implementation of Rural Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- NC-RFQ / Gigantografías, IBRD / 87350 Post Open - National 16,063.00 11,436.15 Completed Alliances Quotations Envelope 16 10 23 09 29 banners, rollers y credenciales BO-EMPODERAR-209268- Implementation of Rural Request for Single Stage - One 2020-12- 2021-02- 2020-12- 2021-08- 2020-12- NC-RFQ / Calendarios de IBRD / 87350 Post Open - National 14,213.00 13,931.93 Completed Alliances Quotations Envelope 16 10 23 09 29 escritorio BO-EMPODERAR-209271- Project Management, Request for Single Stage - One 2020-12- 2021-02- 2021-08- NC-RFQ / Servicio de IBRD / 87350 Post Open - National 13,995.00 0.00 Canceled Monitoring and Evaluation Quotations Envelope 16 10 09 limpieza de las oficinas de la UCN BO-EMPODERAR-210330- NC-DIR / Contratación servicio de limpieza de las Project Management, 2020-12- 2020-12- 2021-01- 2021-07- IBRD / 87350 Post Direct Selection Direct 13,995.00 0.00 Canceled oficinas de la Unidad de Monitoring and Evaluation 16 21 25 24 Coordinación Nacional del Programa EMPODERAR BO-EMPODERAR-217872- Project Management, Request for Single Stage - One 2021-02- 2021-04- 2021-02- 2021-10- 2021-03- NC-RFQ / Impresión de IBRD / 87350 Post Open - National 37,950.00 17,212.34 Completed Monitoring and Evaluation Quotations Envelope 09 06 22 03 04 guías y manuales BO-EMPODERAR-224213- NC-RFQ / IMPRESION DE Request for Single Stage - One 2021-03- 2021-05- 2021-03- 2021-11- 2021-03- ADHESIVOS CON IBRD / 87350 Institutional Strengthening Post Open - National 7,000.00 2,027.52 Completed Quotations Envelope 15 10 29 30 31 INFORMACION DE BIOSEGURIDAD PARA EL PAR II BO-EMPODERAR-224215- NC-RFQ / IMPRESION DE Implementation of Rural Request for Single Stage - One 2021-03- 2021-05- 2021-03- 2021-11- 2021-03- TRIPTICOS DE IBRD / 87350 Post Open - National 7,000.00 6,886.66 Completed Alliances Quotations Envelope 15 10 26 06 31 CONTABILIDAD Y SISTEMAS DE RIEGO PARA EL PAR II BO-EMPODERAR-225629- NC-RFQ / ELABORACION DE Implementation of Rural Request for Single Stage - One 2021-03- 2021-05- 2021-03- 2021-11- 2021-03- IBRD / 87350 Post Open - National 13,995.00 4,263.96 Completed CUADERNOS Alliances Quotations Envelope 24 19 29 15 31 INSITUCIONALES DEL PROYECTO PAR II BO-EMPODERAR-225630- NC-RFQ / ELABORACION DE Implementation of Rural Request for Single Stage - One 2021-03- 2021-05- 2021-03- 2021-11- 2021-03- IBRD / 87350 Post Open - National 4,480.00 2,252.65 Completed SEÑALETICAS PARA EL Alliances Quotations Envelope 24 19 29 15 31 PROYECTO PAR II BO-EMPODERAR-225632- NC-RFQ / ELABORACION DE Implementation of Rural Request for Single Stage - One 2021-03- 2021-05- 2021-04- 2021-11- 2021-04- BANNER (GIGANTOGRAFIAS) IBRD / 87350 Post Open - National 21,850.00 7,843.82 Completed Alliances Quotations Envelope 24 19 05 15 09 PARA LAS UODs DEL PROYECTO PAR II BO-EMPODERAR-227718- NC-RFQ / IMPRESION DE Implementation of Rural Request for Single Stage - One 2021-04- 2021-06- 2021-04- 2021-11- 2021-05- TRIPTICO DE IBRD / 87350 Post Open - National 6,997.00 5,734.97 Completed Alliances Quotations Envelope 06 01 29 28 18 INFRAESTRUCTURA Y RIEGO PARA DIFUSION DEL PAR II CONSULTING FIRMS Activity Reference No. / Actual Short List and Draft Opening of Combined Evaluation Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of Description Component Review Type Method Amount Terms of Reference Request for Technical Proposals Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal (US$) Proposals / Minutes Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Solicitud de adenda a Contrato CS 001/09 / Mail de Jhonny Delgadillo del 15 de mayo, 2015 solicitando Quality Based Open - 2015-05- 2015-05- IDA / 51700 Institutional Strengthening Prior 27,571.00 27,770.19 Signed adenda al Contrato de Selection International 19 18 Servicios de CS 001/09 - PWC para Auditoria de Adquisiciones del proyecto BO-EMPODERAR-57797- CS-QCBS / Evaluación de Implementation of Rural Quality And Cost- 2018-05- 2018-07- 2018-05- 2018-07- 2018-10- 2018-08- 2018-11- 2018-09- 2019-03- 2018-10- 2019-03- 2018-11- 2019-05- 2019-11- 2019-08- desempeño del Proyecto de IBRD / 87350 Post Open - National 61,225.00 47,910.78 Completed Alliances Based Selection 01 31 22 05 16 02 19 01 14 06 26 10 09 10 08 Alianzas Rurales - Segunda Fase BO-EMPODERAR-72124- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-10- 2018-11- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 38,273.00 0.00 Canceled Based Selection 30 20 03 31 30 04 08 08 alianza Unidad Operativa Departamental Santa Cruz BO-EMPODERAR-72125- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-10- 2018-11- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 51,030.00 0.00 Canceled Based Selection 30 20 03 31 30 04 08 08 alianza Unidad Operativa Departamental Cochabamba BO-EMPODERAR-72127- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-10- 2018-11- 2019-01- 2019-02- 2020-02- IBRD / 87350 Institutional Strengthening Post Open - National 48,600.00 0.00 Canceled financiera de alianzas Based Selection 30 20 03 31 30 04 08 08 Unidad Operativa Departamental Tarija BO-EMPODERAR-72128- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-10- 2018-11- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 58,320.00 0.00 Canceled Based Selection 30 20 03 31 30 04 08 08 alianza Unidad Operativa Departamental Oruro BO-EMPODERAR-72210- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 54,675.00 0.00 Canceled Based Selection 31 21 04 01 01 05 09 09 alianza de la Unidad Operativa Departamental La Paz BO-EMPODERAR-72212- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 22,275.00 0.00 Canceled Based Selection 31 21 04 01 01 05 09 09 alianza de la Unidad Operativa Departamental Beni BO-EMPODERAR-72214- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 55,404.00 0.00 Canceled Based Selection 31 21 04 01 01 05 09 09 alianza de la Unidad Operativa Departamental Potosí BO-EMPODERAR-72215- CS-QCBS / Evaluación Quality And Cost- Under 2018-07- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 38,273.00 0.00 Based Selection Implementation 31 21 04 01 01 05 09 09 alianza de la Unidad Operativa Departamental Pando BO-EMPODERAR-72217- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 51,941.00 0.00 Canceled Based Selection 31 21 04 01 01 05 09 09 alianza de la Unidad Operativa Departamental Chuquisaca BO-EMPODERAR-72219- CS-QCBS / Evaluación Quality And Cost- 2018-07- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- financiera de planes de IBRD / 87350 Institutional Strengthening Post Open - National 22,275.00 0.00 Canceled Based Selection 31 21 04 01 01 05 09 09 alianza de la Unidad Operativa Regional Chaco BO-EMPODERAR-96160- CS-QCBS / Evaluación técnica del personal de la Unidad de Coordinación Quality And Cost- 2019-01- 2019-01- 2019-02- 2019-03- 2019-05- 2019-04- 2019-06- 2019-05- 2019-06- 2019-06- 2019-07- 2019-08- 2019-07- 2020-08- 2019-09- Nacional y de las unidades IBRD / 87350 Institutional Strengthening Post Open - National 75,000.00 23,399.24 Completed Based Selection 23 25 13 29 03 26 03 26 14 30 08 04 22 03 16 operativas departamentales del Proyecto de Alianzas Rurales correspondiente a las gestiones 2018, 2019 y 2020 BO-EMPODERAR-98371- CS-QCBS / Evaluación de Project Management, Quality And Cost- Pending 2019-02- 2019-02- 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2020-08- IBRD / 87350 Post Open - National 49,000.00 0.00 lineas de base del PAR II Monitoring and Evaluation Based Selection Implementation 01 22 07 05 04 09 13 12 (financiamiento adicional) BO-EMPODERAR-98375- CS-QCBS / Contratación Project Management, Quality And Cost- 2019-02- 2019-02- 2019-02- 2019-04- 2019-03- 2019-05- 2019-03- 2019-06- 2019-04- 2019-07- 2019-04- 2019-08- 2019-05- 2020-08- IBRD / 87350 Post Open - National 105,000.00 19,907.28 Signed auditoria financiera Monitoring and Evaluation Based Selection 01 25 22 07 26 05 26 04 05 09 15 13 06 12 gestiones 2018, 2019, 2020 BO-EMPODERAR-98378- CS-QCBS / Contratación Project Management, Quality And Cost- 2019-02- 2019-02- 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2020-08- auditoria de adquisiciones IBRD / 87350 Post Open - National 105,000.00 0.00 Canceled Monitoring and Evaluation Based Selection 01 22 07 05 04 09 13 12 correspondiente a las gestiones 2018, 2019 y 2020 BO-EMPODERAR-102668- CS-CQS / Contratación Consultant auditoria especial de Project Management, 2019-02- 2019-03- 2019-04- 2019-05- 2019-07- 2019-12- IBRD / 87350 Post Qualification Open - National 35,000.00 0.00 Canceled adquisiciones y Monitoring and Evaluation 22 15 28 28 02 29 Selection contrataciones correspondiente al periodo de 01/04/2018 al 31/12/19 BO-EMPODERAR-136318- CS-CQS / Supervisión del levantamiento de Consultant información de encuesta de 2019-09- 2019-10- 2019-12- 2019-12- 2020-02- 2020-08- IBRD / 87350 Institutional Strengthening Post Qualification Open - National 51,020.00 0.00 Canceled hogares rurales del PAR II y 27 18 01 31 04 02 Selection determinación de la linea de base del financiamiento adicional del PAR II BO-EMPODERAR-136319- CS-QCBS / Levantamiento de información de encuestas de hogares Quality And Cost- 2019-09- 2019-09- 2019-10- 2019-12- 2019-12- 2020-01- 2020-03- 2020-04- 2021-04- IBRD / 87350 Institutional Strengthening Post Open - National 131,196.00 0.00 Canceled rurales para la evaluación Based Selection 27 18 18 01 29 28 03 07 07 de impacto del PAR II y linea de base del financiamiento adicional del PAR II BO-EMPODERAR-153833- CS-CQS / Contratación Consultant auditoria especial de Project Management, Under 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-05- 2020-11- IBRD / 87350 Post Qualification Open - National 36,000.00 0.00 adquisiciones y Monitoring and Evaluation Implementation 14 21 04 19 18 23 19 Selection contrataciones correspondiente a las gestiones 2018, 2019 y 2020 BO-EMPODERAR-190894- CS-QCBS / Levantamiento de información de encuestas de hogares Quality And Cost- 2020-08- 2020-09- 2020-09- 2020-10- 2020-11- 2020-12- 2021-02- 2021-03- 2021-11- IBRD / 87350 Institutional Strengthening Post Open - National 131,196.00 0.00 Canceled rurales para la evaluación Based Selection 27 01 17 31 28 28 01 08 01 de impacto del PAR II y linea de base del financiamiento adicional del PAR II BO-EMPODERAR-197276- CS-CQS / CONTRATACION DE UNA EMPRESA PARA LA Consultant EVALUACION TECNICA DE Project Management, Under 2020-09- 2020-10- 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- IBRD / 87350 Post Qualification Open - National 45,000.00 0.00 PERSONAL DEL PROYECTO Monitoring and Evaluation Implementation 30 09 21 04 03 07 06 Selection DE ALIANZAS RURALES II, CORRESPONDIENTE A LA GESTION 2020 BO-EMPODERAR-202111- CS-CQS / ASISTENCIA Consultant TECNICA REGIONAL PARA Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled COMERCIALIZACION Monitoring and Evaluation 29 03 19 02 01 08 04 Selection (GESTION DE MERCADOS) - REGION CHACO DEL PAR II BO-EMPODERAR-202114- CS-CQS / ASISTENCIA TECNICA REGIONAL PARA FORTALECIMIENTO Consultant Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- ORGANIZACIONAL IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled Monitoring and Evaluation 29 03 19 02 01 08 04 (GESTION DE PLANES DE Selection NEGOCIOS Y PROYECTOS PRODUCTIVOS) - REGION TROPICO HUMEDO DEL PAR II BO-EMPODERAR-202115- CS-CQS / ASISTENCIA TECNICA REGIONAL PARA Consultant FORTALECIMIENTO Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled ORGANIZACIONAL Monitoring and Evaluation 29 03 19 02 01 08 04 Selection (GESTION DE PLANES DE NEGOCIOS Y PROYECTOS PRODUCTIVOS) - REGION CHACO DEL PAR II BO-EMPODERAR-202112- CS-CQS / ASISTENCIA TECNICA REGIONAL PARA Consultant FORTALECIMIENTO Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled ORGANIZACIONAL Monitoring and Evaluation 29 03 19 02 01 08 04 Selection (GESTION DE PLANES DE NEGOCIOS Y PROYECTOS PRODUCTIVOS) - REGION ALTIPLANO DEL PAR II BO-EMPODERAR-201957- CS-CQS / ASISTENCIA TECNICA REGIONAL PARA Consultant PRODUCCION (PRIMARIA Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled Y/O DE TRANSFORMACION, Monitoring and Evaluation 29 03 19 02 01 08 04 Selection GESTION AMBIENTAL Y ADAPTACION AL CAMBIO CLIMATICO) - REGION ALTIPLANO DEL PAR II BO-EMPODERAR-202099- CS-CQS / ASISTENCIA TECNICA REGIONAL PARA Consultant PRODUCCION (PRIMARIA Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled Y/O DE TRANSFORMACION, Monitoring and Evaluation 29 03 19 02 01 08 04 Selection GESTION AMBIENTAL Y ADAPTACION AL CAMBIO CLIMATICO) - REGION VALLES DEL PAR II BO-EMPODERAR-202110- CS-CQS / ASISTENCIA Consultant TECNICA REGIONAL PARA Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled COMERCIALIZACION Monitoring and Evaluation 29 03 19 02 01 08 04 Selection (GESTION DE MERCADOS) - REGION TROPICO HUMEDO DEL PAR II BO-EMPODERAR-202113- CS-CQS / ASISTENCIA TECNICA REGIONAL PARA Consultant FORTALECIMIENTO Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled ORGANIZACIONAL Monitoring and Evaluation 29 03 19 02 01 08 04 Selection (GESTION DE PLANES DE NEGOCIOS Y PROYECTOS PRODUCTIVOS) - REGION VALLES DEL PAR II BO-EMPODERAR-202101- CS-CQS / ASISTENCIA TECNICA REGIONAL PARA Consultant PRODUCCION (PRIMARIA Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled Y/O DE TRANSFORMACION, Monitoring and Evaluation 29 03 19 02 01 08 04 Selection GESTION AMBIENTAL Y ADAPTACION AL CAMBIO CLIMATICO) - REGION CHACO DEL PAR II BO-EMPODERAR-202107- CS-CQS / ASISTENCIA Consultant TECNICA REGIONAL PARA Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled COMERCIALIZACION Monitoring and Evaluation 29 03 19 02 01 08 04 Selection (GESTION DE MERCADOS) - REGION ALTIPLANO DEL PAR II BO-EMPODERAR-202108- CS-CQS / ASISTENCIA Consultant TECNICA REGIONAL PARA Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled COMERCIALIZACION Monitoring and Evaluation 29 03 19 02 01 08 04 Selection (GESTION DE MERCADOS) - REGION VALLES DEL PAR II BO-EMPODERAR-202100- CS-CQS / ASISTENCIA TECNICA REGIONAL PARA Consultant PRODUCCION (PRIMARIA Project Management, 2020-10- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 87350 Post Qualification Open - National 50,000.00 0.00 Canceled Y/O DE TRANSFORMACION, Monitoring and Evaluation 29 03 19 02 01 08 04 Selection GESTION AMBIENTAL Y ADAPTACION AL CAMBIO CLIMATICO) - REGION TROPICO HUMEDO DEL PAR II BO-EMPODERAR-231273- CS-QCBS / Levantamiento de información de Quality And Cost- Under 2021-04- 2021-04- 2021-05- 2021-06- 2021-07- 2021-07- 2021-07- 2021-08- 2021-12- IBRD / 87350 Institutional Strengthening Post Open - National 131,196.00 0.00 encuestas de hogares Based Selection Implementation 23 26 14 04 02 16 30 19 17 rurales para la evaluación de impacto del PAR II INDIVIDUAL CONSULTANTS Activity Reference No. / Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Status Contract (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MDRyT/EMPODERAR/PAR/E A/019/2014 / No objecion Individual Under 2014-10- contratacion de Oficial de IDA / 51700 Institutional Strengthening Prior Consultant Open 6,240.00 6,112.88 Implementation 29 Negocios de la UOR Valles Selection Centro Cochabamba. Page 3 BO-EMPODERAR-57030- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Especialista en IBRD / 87350 Post Consultant Direct 79,561.00 4,642.19 Terminated Alliances 01 17 11 17 02 17 06 17 03 negocios 1 Selection BO-EMPODERAR-57058- Individual CS-INDV / Especialista en Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- IBRD / 87350 Post Consultant Direct 79,561.00 4,642.19 Terminated capacitación y asistencia Alliances 01 17 11 17 02 17 06 17 03 Selection técnica BO-EMPODERAR-57073- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Especialista en IBRD / 87350 Post Consultant Direct 79,561.00 4,642.19 Signed Alliances 01 17 11 17 02 17 06 17 03 infraestructura. Selection BO-EMPODERAR-57011- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista en IBRD / 87350 Post Consultant Direct 67,335.00 4,231.02 Terminated Alliances 01 17 11 17 02 17 06 17 03 comunicación Selection BO-EMPODERAR-57032- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 67,335.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 ambiental Santa Cruz Selection BO-EMPODERAR-57066- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 67,335.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 ambiental Cochabamba Selection BO-EMPODERAR-57055- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 67,335.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 ambiental Tarija Selection BO-EMPODERAR-57017- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Oficial de IBRD / 87350 Post Consultant Direct 72,514.00 4,224.90 Signed Alliances 01 17 11 17 02 17 06 17 03 infraestructura y riego Selection Tarija BO-EMPODERAR-57059- Individual CS-INDV / Oficial de Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed infraestructura y riego Alliances 01 17 11 17 02 17 06 17 03 Selection Santa Cruz BO-EMPODERAR-57024- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Especialista IBRD / 87350 Post Consultant Direct 98,094.00 5,955.56 Signed Alliances 01 17 11 17 02 17 06 17 03 financiero Selection BO-EMPODERAR-57028- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Especialista de IBRD / 87350 Post Consultant Direct 79,561.00 10,403.61 Terminated Alliances 01 17 11 17 02 17 06 17 03 adquisiciones Selection BO-EMPODERAR-57097- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista de IBRD / 87350 Post Consultant Direct 76,659.00 4,472.86 Signed Alliances 01 17 11 17 02 17 06 17 03 desembolsos 1 Selection BO-EMPODERAR-57076- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 76,659.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 financiero 1 Selection BO-EMPODERAR-57096- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 68,786.00 4,013.47 Signed Alliances 01 17 11 17 02 17 06 17 03 financiero 2 Selection BO-EMPODERAR-57151- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 fiduciario Santa Cruz Selection BO-EMPODERAR-57054- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 fiduciario Santa Cruz Selection BO-EMPODERAR-57029- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 fiduciario Cochabamba Selection BO-EMPODERAR-57057- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 fiduciario Tarija Selection BO-EMPODERAR-57019- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,402.55 Signed Alliances 01 17 11 17 02 17 06 17 03 fiduciario La Paz Selection BO-EMPODERAR-57080- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 fiduciario Chuquisaca Selection BO-EMPODERAR-57060- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 fiduciario Chaco Selection BO-EMPODERAR-57101- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Especialista en IBRD / 87350 Post Consultant Direct 98,094.00 5,723.52 Signed Alliances 01 17 11 17 02 17 06 17 03 planificación y monitoreo Selection BO-EMPODERAR-57026- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente - IBRD / 87350 Post Consultant Direct 38,535.00 2,245.15 Signed Alliances 01 17 11 17 02 17 06 17 03 Administrativo Selection BO-EMPODERAR-57063- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 33,318.00 1,944.04 Signed Alliances 01 17 11 17 02 17 06 17 03 administrativo Santa Cruz Selection BO-EMPODERAR-57070- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 33,318.00 1,941.23 Signed Alliances 01 17 11 17 02 17 06 17 03 administrativo Cochabamba Selection BO-EMPODERAR-57094- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 33,318.00 1,941.23 Signed Alliances 01 17 11 17 02 17 06 17 03 administrativo Tarija Selection BO-EMPODERAR-57020- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 33,318.00 1,941.23 Signed Alliances 01 17 11 17 02 17 06 17 03 administrativo Chaco Selection BO-EMPODERAR-57099- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 1,941.23 Signed Alliances 01 17 11 17 02 17 06 17 03 mensajero Santa Cruz Selection BO-EMPODERAR-57071- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 1,941.23 Signed Alliances 01 17 11 17 02 17 06 17 03 mensajero Tarija Selection BO-EMPODERAR-57034- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 1,941.23 Signed Alliances 01 17 11 17 02 17 06 17 03 mensajero La Paz Selection BO-EMPODERAR-57053- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 1,941.23 Signed Alliances 01 17 11 17 02 17 06 17 03 mensajero La Paz Selection BO-EMPODERAR-57014- Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 1,941.23 Signed Alliances 01 17 11 17 02 17 06 17 03 mensajero Chaco Selection BO-EMPODERAR-57795- Individual CS-INDV / Base de datos de Implementation of Rural 2018-08- 2018-10- 2018-10- 2018-11- 2019-05- IBRD / 87350 Post Consultant Open 3,890.00 0.00 Canceled proveedores de bienes y Alliances 15 03 24 28 27 Selection servicios BO-EMPODERAR-57766- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Alliances 16 04 25 30 26 Ambiental La Paz Selection BO-EMPODERAR-57704- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 67,335.00 0.00 Canceled Alliances 16 04 25 30 26 ambiental Oruro Selection BO-EMPODERAR-57733- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- 2020-12- CS-INDV / Analista IBRD / 87350 Post Consultant Open 67,335.00 9,047.65 Completed Alliances 16 29 04 18 25 01 30 01 26 31 ambiental Beni Selection BO-EMPODERAR-57705- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 67,335.00 0.00 Canceled Alliances 16 04 25 30 26 ambiental Potosí Selection BO-EMPODERAR-57748- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 67,335.00 9,047.79 Signed Alliances 16 29 04 18 25 01 30 01 26 ambiental Pando Selection BO-EMPODERAR-57770- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 67,335.00 9,047.79 Signed Alliances 16 29 04 18 25 01 30 01 26 ambiental Chuquisaca Selection BO-EMPODERAR-57735- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 67,335.00 9,047.79 Signed Alliances 16 29 04 18 25 01 30 01 26 ambiental Chaco Selection BO-EMPODERAR-57862- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Oficial de IBRD / 87350 Post Consultant Open 67,335.00 9,041.24 Signed Alliances 16 29 04 18 25 01 30 01 26 infraestructura y riego Selection Chaco BO-EMPODERAR-57726- Individual CS-INDV / Oficial de Implementation of Rural 2018-04- 2018-09- 2018-06- 2018-11- 2018-06- 2018-12- 2018-07- 2018-12- 2019-01- IBRD / 87350 Post Consultant Open 67,335.00 1,266.69 Signed infraestructura y riego Alliances 16 16 04 23 25 10 30 10 26 Selection Cochabamba BO-EMPODERAR-57771- Individual Implementation of Rural 2018-04- 2018-09- 2018-06- 2018-11- 2018-06- 2018-12- 2018-07- 2018-12- 2019-01- CS-INDV / Oficial de IBRD / 87350 Post Consultant Open 67,335.00 1,447.65 Signed Alliances 16 16 04 23 25 07 30 07 26 infraestructura y riego Selection Oruro BO-EMPODERAR-57707- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Oficial de IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed Alliances 16 29 04 18 25 01 30 01 26 infraestructura y riego La Selection Paz BO-EMPODERAR-57846- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Oficial de IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed Alliances 16 29 04 18 25 01 30 01 26 infraestructura y riego Beni Selection BO-EMPODERAR-57773- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Oficial de IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed Alliances 16 29 04 18 25 01 30 01 26 infraestructura y riego Selection Potosí BO-EMPODERAR-57708- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Oficial de IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed Alliances 16 29 04 18 25 07 30 07 26 infraestructura y riego Selection Pando BO-EMPODERAR-57848- Individual CS-INDV / Oficial de Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed infraestructura y riego Alliances 16 29 04 18 25 01 30 01 26 Selection Chuquisaca BO-EMPODERAR-57467- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista de IBRD / 87350 Post Consultant Open 63,872.00 8,582.70 Signed Alliances 16 29 04 18 25 01 30 01 26 desembolsos 2 Selection BO-EMPODERAR-57774- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 63,872.00 8,582.91 Signed Alliances 16 29 04 18 25 01 30 01 26 financiero 2 Selection BO-EMPODERAR-57834- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 9,041.10 Signed Alliances 16 29 04 18 25 01 30 01 26 fiduciario Cochabamba Selection BO-EMPODERAR-57469- Individual Implementation of Rural 2018-04- 2018-09- 2018-06- 2018-11- 2018-06- 2018-12- 2018-07- 2018-12- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 1,025.42 Signed Alliances 16 16 04 23 25 13 30 13 26 fiduciario Tarija Selection BO-EMPODERAR-57470- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed Alliances 16 29 04 18 25 01 30 01 26 fiduciario Oruro Selection BO-EMPODERAR-57777- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed Alliances 16 29 04 18 25 01 30 01 26 fiduciario Beni Selection BO-EMPODERAR-57738- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed Alliances 16 29 04 18 25 01 30 01 26 fiduciario Potosí Selection BO-EMPODERAR-57749- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 9,047.79 Signed Alliances 16 29 04 18 25 01 30 01 26 fiduciario Pando Selection BO-EMPODERAR-57833- Individual Implementation of Rural 2018-04- 2018-07- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 -19.67 Terminated Alliances 16 18 04 18 25 01 30 01 26 fiduciario Pando Selection BO-EMPODERAR-57751- Individual Implementation of Rural 2018-04- 2018-09- 2018-06- 2018-11- 2018-06- 2018-12- 2018-07- 2018-12- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 1,447.65 Signed Alliances 16 16 04 23 25 07 30 07 26 fiduciario Chuquisaca Selection BO-EMPODERAR-57740- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 9,041.24 Signed Alliances 16 29 04 18 25 01 30 01 26 fiduciario Chaco Selection BO-EMPODERAR-57474- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 33,318.00 0.00 Canceled Alliances 16 04 25 30 26 administrativo Oruro Selection BO-EMPODERAR-57717- Individual Implementation of Rural 2018-04- 2018-05- 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 33,318.00 4,157.13 Signed Alliances 16 20 04 05 25 01 30 01 26 administrativo La Paz Selection Page 4 BO-EMPODERAR-57718- Individual Implementation of Rural 2018-04- 2018-09- 2018-06- 2018-09- 2018-06- 2018-10- 2018-07- 2018-10- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 33,318.00 2,494.28 Signed Alliances 16 21 04 21 25 01 30 01 26 administrativo Beni Selection BO-EMPODERAR-57780- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 33,318.00 0.00 Canceled Alliances 16 04 25 30 26 administrativo Potosí Selection BO-EMPODERAR-57709- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 33,318.00 0.00 Canceled Alliances 16 04 25 30 26 administrativo Pando Selection BO-EMPODERAR-57845- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 33,318.00 0.00 Canceled Alliances 16 04 25 30 26 administrativo Chuquisaca Selection BO-EMPODERAR-57711- Individual Implementation of Rural 2018-04- 2018-07- 2018-06- 2018-07- 2018-06- 2018-07- 2018-07- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 30,938.00 4,766.84 Signed Alliances 16 03 04 03 25 12 30 12 26 mensajero Cochabamba Selection BO-EMPODERAR-57719- Individual Implementation of Rural 2018-04- 2018-11- 2018-06- 2018-11- 2018-06- 2018-11- 2018-07- 2018-11- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 30,938.00 1,358.00 Signed Alliances 16 07 04 07 25 12 30 12 26 mensajero Beni Selection BO-EMPODERAR-57476- Individual Implementation of Rural 2018-04- 2018-08- 2018-06- 2018-09- 2018-06- 2018-10- 2018-07- 2018-10- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 30,938.00 2,494.28 Signed Alliances 16 30 04 20 25 01 30 01 26 mensajero Chuquisaca Selection BO-EMPODERAR-58139- Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- CS-INDV / Especialista en IBRD / 87350 Post Consultant Open 79,561.00 9,927.59 Signed Alliances 16 29 04 18 25 01 30 01 26 Infraestructura y Riego Selection BO-EMPODERAR-57016- CS-INDV / Operador Cochabamba: Consultor de Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- linea Operador IBRD / 87350 Post Consultant Direct 98,094.00 5,955.56 Signed Alliances 01 17 11 17 02 17 06 17 03 Departamental de la Unidad Selection Operativa Departamental Cochabamba . Responsable de la Unidad BO-EMPODERAR-57849- CS-INDV / 46 Facilitadores UOD Santa Cruz : Facilitador de la Unidad Individual Operativa Departamental Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-11- 2018-08- 2018-11- 2018-09- 2018-11- 2019-03- 2019-05- IBRD / 87350 Post Consultant Open 178,618.00 103,147.35 Completed Santa Cruz, Consultor por Alliances 01 15 20 20 10 22 14 26 13 21 Selection producto, Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57744- CS-INDV / 45 Facilitadores UOD Cochabamba: Facilitador de la Unidad Individual Operativa Departamental Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-11- 2018-08- 2018-11- 2018-09- 2018-12- 2019-03- 2019-08- IBRD / 87350 Post Consultant Open 176,918.00 206,418.43 Completed Cochabamba, Consultor por Alliances 01 27 20 21 10 21 14 05 13 01 Selection producto, Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57453- CS-INDV / 46 Facilitadores UOD Tarija: Facilitador de la Unidad Operativa Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-10- 2018-08- 2018-11- 2018-09- 2018-12- 2019-03- 2019-10- Departamental Tarija, IBRD / 87350 Post Consultant Open 178,618.00 171,846.48 Completed Alliances 01 16 20 29 10 12 14 28 13 11 Consultor por producto, Selection Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57712- CS-INDV / 45 Facilitadores UOD Oruro: Facilitador de la Unidad Operativa Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-09- 2018-08- 2018-11- 2018-09- 2018-11- 2019-03- 2019-08- Departamental Oruro, IBRD / 87350 Post Consultant Open 176,918.00 170,714.94 Completed Alliances 01 15 20 06 10 13 14 29 13 26 Consultor por producto, Selection Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57756- CS-INDV / 46 Facilitadores UOD La Paz: Facilitador de la Unidad Operativa Individual Departamental La Paz, Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-03- 2019-05- IBRD / 87350 Post Consultant Open 178,618.00 198,173.00 Completed Consultor por producto, Alliances 01 22 20 03 10 05 14 05 13 03 Selection Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57458- CS-INDV / 45 Facilitadores UOD Beni: Facilitador de la Unidad Operativa Individual Implementation of Rural 2018-06- 2018-10- 2018-07- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-03- 2019-06- Departamental Beni, IBRD / 87350 Post Consultant Open 176,918.00 35,560.07 Completed Alliances 01 23 20 07 10 12 14 12 13 17 Consultor por producto, Selection Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57713- CS-INDV / 45 Facilitadores UOD Potosí: Facilitador de la Unidad Operativa Individual Departamental Potosí, Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-10- 2018-08- 2018-10- 2018-09- 2018-11- 2019-03- 2019-07- IBRD / 87350 Post Consultant Open 176,918.00 183,206.96 Completed Consultor por producto, Alliances 01 19 20 19 10 22 14 26 13 09 Selection Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57757- CS-INDV / 45 Facilitadores UOD Pando: Facilitador de la Unidad Operativa Individual Departamental Pando, Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-11- 2018-08- 2018-11- 2018-09- 2018-12- 2019-03- 2019-06- IBRD / 87350 Post Consultant Open 176,918.00 284,358.91 Completed Consultor por producto, Alliances 01 12 20 07 10 12 14 18 13 30 Selection Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57727- CS-INDV / 46 Facilitadores UOD Chuquisaca: Facilitador de la Unidad Individual Operativa Departamental Implementation of Rural 2018-06- 2018-06- 2018-07- 2018-08- 2018-08- 2018-09- 2018-09- 2019-12- 2019-03- 2019-12- IBRD / 87350 Post Consultant Open 178,618.00 240,547.53 Completed Chuquisaca, Consultor por Alliances 01 29 20 31 10 17 14 17 13 17 Selection producto, Encargado de la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57857- CS-INDV / 32 Facilitadores UOD Chaco: Facilitador de la Unidad Operativa Individual Implementation of Rural 2018-06- 2018-08- 2018-07- 2018-10- 2018-08- 2018-10- 2018-09- 2018-11- 2019-03- 2019-05- Regional Chaco, Consultor IBRD / 87350 Post Consultant Open 121,383.00 129,340.08 Completed Alliances 01 14 20 25 10 29 14 21 13 19 por producto, Encargado de Selection la elaborar planes de alianza (planes de negocio) para su financiamiento BO-EMPODERAR-57789- CS-INDV / Analista en DO Santa Cruz: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-09- 2018-06- 2018-11- 2018-06- 2018-12- 2018-07- 2018-12- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 1,447.65 Signed Operativa Departamental Alliances 16 16 04 23 25 07 30 07 26 Selection Santa Cruz, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57758- CS-INDV / Analista en DO Cochabamba: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 0.00 Canceled Operativa Departamental Alliances 16 04 25 30 26 Selection Cochabamba, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57760- CS-INDV / Analista en DO Tarija: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-09- 2018-06- 2018-11- 2018-06- 2018-12- 2018-07- 2018-12- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 1,266.69 Signed Operativa Departamental Alliances 16 16 04 23 25 10 30 10 26 Selection Tarija, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57761- CS-INDV / Analista en DO Oruro: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 0.00 Canceled Operativa Departamental Alliances 16 04 25 30 26 Selection Oruro, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57792- CS-INDV / Analista en DO La Paz:Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 0.00 Canceled Operativa Departamental La Alliances 16 04 25 30 26 Selection Paz, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57815- CS-INDV / Analista en DO Beni: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 9,041.24 Signed Operativa Departamental Alliances 16 29 04 18 25 01 30 01 26 Selection Beni, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57482- CS-INDV / Analista en DO Pando: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 9,041.24 Signed Operativa Departamental Alliances 16 29 04 18 25 01 30 01 26 Selection Pando, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57697- CS-INDV / Analista en DO Chuquisaca: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 9,041.24 Signed Operativa Departamental Alliances 16 04 27 25 27 30 27 26 Selection Chuquisaca, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57839- CS-INDV / Analista en DO Chaco: Consultor de linea Analista en Desarrollo Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- Organizacional de la Unidad IBRD / 87350 Post Consultant Open 62,155.00 9,041.24 Signed Alliances 16 29 04 18 25 07 30 07 26 Operativa Regional Chaco, Selection Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57728- CS-INDV / 14 Acompañantes UOD Santa Cruz: Acompañante de la Unidad Operativa Individual Departamental Santa Cruz, Implementation of Rural 2018-05- 2018-06- 2018-07- 2018-08- 2019-02- IBRD / 87350 Post Consultant Open 253,546.00 0.00 Canceled Consultor por producto, Alliances 01 19 10 14 10 Selection Responsable de la ejecución de las actividades de los planes de alianza, la implementación física, financiera y técnica y el Fort. Orga. BO-EMPODERAR-57762- CS-INDV / 14 Acompañantes UOD Cochabamba: Acompañante de la Unidad Operativa Individual Departamental Implementation of Rural 2018-05- 2019-09- 2018-06- 2019-12- 2018-07- 2019-12- 2018-08- 2019-12- 2019-02- IBRD / 87350 Post Consultant Open 253,546.00 117,962.82 Signed Cochabamba, Consultor por Alliances 01 23 19 17 10 18 14 18 10 Selection producto, Responsable de la ejecución de las actividades de los planes de alianza, la implementación física, financiera y técnica y el Fort Organiza Page 5 BO-EMPODERAR-57714- CS-INDV / 14 Acompañantes UOD Tarija: Acompañante de la Unidad Operativa Departamental Individual Tarija Consultor por Implementation of Rural 2018-05- 2019-01- 2018-06- 2019-01- 2018-07- 2019-02- 2018-08- 2019-10- 2019-02- IBRD / 87350 Post Consultant Open 253,546.00 49,583.17 Signed producto, Responsable de Alliances 01 28 19 28 10 01 14 07 10 Selection la ejecución de las actividades de los planes de alianza, la implementación física, financiera y técnica y el Fortalecimiento Organi BO-EMPODERAR-57460- CS-INDV / 14 Acompañantes UOD Oruro: Acompañante de la Unidad Operativa Departamental Individual Potosi, Consultor por Implementation of Rural 2018-05- 2019-08- 2018-06- 2019-09- 2018-07- 2019-10- 2018-08- 2019-11- 2019-02- IBRD / 87350 Post Consultant Open 253,546.00 105,860.66 Signed producto, Responsable de Alliances 01 20 19 18 10 01 14 14 10 Selection la ejecución de las actividades de los planes de alianza, la implementación física, financiera y técnica y el Fort. Organizacional BO-EMPODERAR-57698- CS-INDV / 14 Acompañantes UOD La Paz: Acompañante de la Unidad Operativa Departamental La Individual Paz, Consultor por Implementation of Rural 2018-05- 2015-07- 2018-06- 2019-10- 2018-07- 2019-10- 2018-08- 2019-11- 2019-02- IBRD / 87350 Post Consultant Open 257,376.00 164,031.91 Signed producto, Responsable de Alliances 01 29 19 17 10 17 14 21 10 Selection la ejecución de las actividades de los planes de alianza, la implementación física, financiera y técnica y el Fortalecimiento Organ BO-EMPODERAR-57856- CS-INDV / 14 Acompañantes UOD Beni: Acompañante de la Unidad Operativa Departamental Individual Implementation of Rural 2018-05- 2018-06- 2018-07- 2018-08- 2019-02- Beni, Consultor por IBRD / 87350 Post Consultant Open 253,546.00 0.00 Canceled Alliances 01 19 10 14 10 producto, Responsable de Selection la ejecución de las actividades de los planes de alianza, la implementación física, financiera y técnica y el Fortalecimiento Organizac BO-EMPODERAR-57850- CS-INDV / 14 Acompañantes UOD Potosí: Acompañante de la Unidad Operativa Departamental Individual Potosí, Consultor por Implementation of Rural 2018-05- 2019-02- 2018-06- 2019-02- 2018-07- 2019-02- 2018-08- 2019-10- 2019-02- IBRD / 87350 Post Consultant Open 253,546.00 69,026.09 Signed producto, Responsable de Alliances 01 06 19 07 10 08 14 11 10 Selection la ejecución de las actividades de los planes de alianza, la implementación física, financiera y técnica y el Fortalecimiento Organ BO-EMPODERAR-57796- CS-INDV / 14 Acompañantes UOD Pando:Acompañante de la Unidad Operativa Individual Departamental Pando, Implementation of Rural 2018-05- 2019-02- 2018-06- 2019-02- 2018-07- 2019-02- 2018-08- 2019-12- 2019-02- IBRD / 87350 Post Consultant Open 244,354.00 140,755.48 Signed Consultor por producto, Alliances 01 04 19 05 10 06 14 11 10 Selection Responsable de la ejecución de las actividades de los planes de alianza la implementación física, financiera y técnica y el fortalecimiento Organizac BO-EMPODERAR-57763- CS-INDV / 14 Acompañantes UOD Chuquisaca:Acompañante de la Unidad Operativa Departamental Chuquisaca, Individual Implementation of Rural 2018-05- 2019-10- 2018-06- 2019-10- 2018-07- 2019-10- 2018-08- 2019-10- 2019-02- Consultor por producto, IBRD / 87350 Post Consultant Open 255,844.00 56,191.16 Signed Alliances 01 14 19 07 10 17 14 28 10 Responsable de la ejecución Selection de las actividades de los planes de alianza, la implementación física, financiera y técnica y el Forta Organi BO-EMPODERAR-57729- CS-INDV / 9 Acompañantes UOD Chaco:Acompañante de la Unidad Operativa Regional Chaco, Consultor Individual Implementation of Rural Under 2018-05- 2018-06- 2018-07- 2018-08- 2019-02- por producto, Responsable IBRD / 87350 Post Consultant Open 151,668.00 0.00 Alliances Implementation 01 19 10 14 10 de la ejecución de las Selection actividades de los planes de alianza, la implementación física, financiera y técnica y el fortalecimiento organizacional BO-EMPODERAR-57699- CS-INDV / 16 Acompañantes financiamiento inicial: Individual Consultor por producto, Implementation of Rural 2018-05- 2018-08- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2019-02- 2019-11- IBRD / 87350 Post Consultant Open 260,182.00 202,398.13 Signed Responsable de la ejecución Alliances 01 02 19 02 10 10 14 28 10 28 Selection de las actividades de los planes de alianza, la implementación física, financiera y técnica y el fortalecimiento organizacional BO-EMPODERAR-57700- CS-INDV / Operador Beni: Individual Consultor de linea. Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- IBRD / 87350 Post Consultant Open 98,094.00 12,239.71 Signed Operador Departamental de Alliances 16 29 04 18 25 01 30 01 26 Selection la Unidad Operativa Departamental Beni. Responsable de la Unidad BO-EMPODERAR-57463- CS-INDV / Operador Potosí: Consultor de linea. Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- Operador Departamental de IBRD / 87350 Post Consultant Open 98,094.00 0.00 Canceled Alliances 16 04 25 30 26 la Unidad Operativa Selection Departamental Potosí. Responsable de la Unidad BO-EMPODERAR-57465- CS-INDV / Operador Chuquisaca: Consultor de Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- linea. Operador IBRD / 87350 Post Consultant Open 98,094.00 0.00 Canceled Alliances 16 04 25 30 26 Departamental de la Unidad Selection Operativa Departamental Chuquisaca. Responsable de la Unidad. BO-EMPODERAR-57731- CS-INDV / Oficial de alianza Tarija: Oficial de Alianzas Unidad Operativa Departamental Tarija, Individual Consultor de linea, Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 9,047.65 Signed Responsable de promover Alliances 16 29 04 18 25 01 30 01 26 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57701- CS-INDV / Oficial de alianza Oruro: Oficial de Alianzas Unidad Operativa Departamental Oruro, Individual Consultor de linea, Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Responsable de promover Alliances 16 04 25 30 26 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57732- CS-INDV / Oficial de alianza Oruro: Oficial de Alianzas Unidad Operativa Departamental Oruro, Individual Consultor de linea, Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Responsable de promover Alliances 16 04 25 30 26 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57769- CS-INDV / Oficial de alianza Beni: Oficial de Alianzas Unidad Operativa Individual Departamental Beni, Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 9,047.79 Signed Consultor de linea, Alliances 16 29 04 18 25 01 30 01 26 Selection Responsable de promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-57855- CS-INDV / Oficial de alianza Beni : Oficial de Alianzas Unidad Operativa Departamental Beni, Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- Consultor de linea, IBRD / 87350 Post Consultant Open 72,514.00 9,047.79 Signed Alliances 16 29 04 18 25 01 30 01 26 Responsable de promover Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57835- CS-INDV / Oficial de alianza Potosí: Oficial de Alianzas Unidad Operativa Departamental Potosí, Individual Consultor de linea, Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Responsable de promover Alliances 16 04 25 30 26 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57747- CS-INDV / Oficial de alianza Potosí:Oficial de Alianzas Unidad Operativa Departamental Potosí, Individual Consultor de linea, Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Responsable de promover Alliances 16 04 25 30 26 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57715- CS-INDV / Oficial de alianza Pando:Oficial de Alianzas Unidad Operativa Departamental Pando, Individual Consultor de linea, Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Responsable de promover Alliances 16 04 25 30 26 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57716- CS-INDV / Oficial de alianza Pando:Oficial de Alianzas Unidad Operativa Departamental Pando, Individual Consultor de linea, Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Responsable de promover Alliances 16 04 25 30 26 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57725- CS-INDV / Oficial de alianza Chuquisaca: Oficial de Alianzas Unidad Operativa Departamental Individual Chuquisaca, Consultor de Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled linea, Responsable de Alliances 16 04 25 30 26 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57863- CS-INDV / Oficial de alianza Chaco:Oficial de Alianzas Unidad Operativa Regional Chaco, Consultor Individual Implementation of Rural 2018-04- 2018-04- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- de linea, Responsable de IBRD / 87350 Post Consultant Open 72,514.00 9,047.79 Signed Alliances 16 29 04 18 25 01 30 01 26 promover alianzas rurales, Selection supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. Page 6 BO-EMPODERAR-57061- CS-INDV / Oficial de alianza Santa Cruz: Oficial de Alianzas Unidad Operativa Departamental Individual Santa Cruz, Consultor de Implementation of Rural 2016-04- 2018-04- 2016-04- 2018-04- 2016-05- 2018-04- 2016-06- 2018-04- 2016-12- IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed linea, Responsable de Alliances 01 17 11 17 02 17 06 17 03 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57100- CS-INDV / Operador Santa Cruz: Consultor de linea. Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- Operador Departamental de IBRD / 87350 Post Consultant Direct 98,094.00 5,723.52 Signed Alliances 01 17 11 17 02 17 06 17 03 la Unidad Operativa Selection Departamental Santa Cruz. Responsable de la Unidad BO-EMPODERAR-57087- CS-INDV / Operador Tarija: Consultor de linea. Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- Operador Departamental de IBRD / 87350 Post Consultant Direct 98,094.00 5,723.52 Signed Alliances 01 17 11 17 02 17 06 17 03 la Unidad Operativa Selection Departamental Tarija . Responsable de la Unidad BO-EMPODERAR-57098- CS-INDV / Operador La Individual Paz: Consultor de linea. Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- IBRD / 87350 Post Consultant Direct 98,094.00 5,723.52 Terminated Operador Departamental de Alliances 01 17 11 17 02 17 06 17 03 Selection la Unidad Operativa Departamental La Paz. Responsable de la Unidad BO-EMPODERAR-57069- CS-INDV / Operador Chaco: Individual Consultor de linea. Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- IBRD / 87350 Post Consultant Direct 98,094.00 5,723.42 Signed Operador Regional de la Alliances 01 17 11 17 02 17 06 17 03 Selection Unidad Operativa Regional Chaco. Responsable de la Unidad BO-EMPODERAR-57064- CS-INDV / Oficial de alianza Santa Cruz: Oficial de Alianzas Unidad Operativa Departamental Individual Santa Cruz, Consultor de Implementation of Rural 2016-04- 2018-04- 2016-04- 2018-04- 2016-05- 2018-04- 2016-06- 2018-04- 2016-12- IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed linea, Responsable de Alliances 01 17 11 17 02 17 06 17 03 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57027- CS-INDV / Oficial de alianza Cochabamba: Oficial de Alianzas Unidad Operativa Departamental Individual Cochabamba, Consultor de Implementation of Rural 2016-04- 2018-04- 2016-04- 2018-04- 2016-05- 2018-04- 2016-06- 2018-04- 2016-12- IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed linea, Responsable de Alliances 01 17 11 17 02 17 06 17 03 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57084- CS-INDV / Oficial de alianza Tarija: Oficial de Alianzas Unidad Operativa Departamental Tarija, Individual Consultor de linea, Implementation of Rural 2016-04- 2018-04- 2016-04- 2018-04- 2016-05- 2018-04- 2016-06- 2018-04- 2016-12- IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed Responsable de promover Alliances 01 17 11 17 02 17 06 17 03 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57021- CS-INDV / Oficial de alianzas Chaco: Oficial de Alianzas Unidad Operativa Regional Chaco, Consultor Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- de linea, Responsable de IBRD / 87350 Post Consultant Direct 72,514.00 4,402.55 Signed Alliances 01 17 11 17 02 17 06 17 03 promover alianzas rurales, Selection supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57065- CS-INDV / Oficial de alianzas Chuquisaca : Oficial de Alianzas Unidad Operativa Departamental Individual Chuquisaca Consultor de Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed linea, Responsable de Alliances 01 17 11 17 02 17 06 17 03 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57056- CS-INDV / Oficial de alianzas La Paz:Oficial de Alianzas Unidad Operativa Departamental La Paz, Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- Consultor de linea, IBRD / 87350 Post Consultant Direct 67,335.00 4,231.02 Signed Alliances 01 17 11 17 02 17 06 17 03 Responsable de promover Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-57067- CS-INDV / ASISTENTE DESARROLLO SIGG: Consultor en linea. Para Desarrollar, actualizar y Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- mantener el sistema de IBRD / 87350 Post Consultant Direct 55,407.00 3,481.55 Signed Alliances 01 17 11 17 02 17 06 17 03 información gerencial Selection georeferenciado en su segunda versión (SIGG II) para la sistematización de la información emergente de la ejecución del Proyecto PAR BO-EMPODERAR-57082- CS-INDV / Auxiliar - Técnico UCN: Consultor de linea responsable de Individual apoyar al equipo técnico y Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- IBRD / 87350 Post Consultant Direct 38,535.00 2,248.40 Signed administrativo del Proyecto Alliances 01 17 11 17 02 17 06 17 03 Selection de Alianzas Rurales, en las actividades y tareas criticas que se presenten en la operación del Proyecto. BO-EMPODERAR-58122- CS-INDV / Asistente de Negocios:Consultor de linea. Apoyo al especialista de Negocios de la UCN en Individual Implementation of Rural 2018-04- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-04- 2018-12- difusión del proyecto, IBRD / 87350 Post Consultant Direct 55,407.00 3,481.55 Signed Alliances 10 17 20 17 11 17 15 17 12 registro de información, Selection control de calidad del SIGG, promoción del Modelo III y elaboración de información para Comité de Proyectos del PAR BO-EMPODERAR-57068- CS-INDV / Oficial de alianza La Paz: Oficial de Alianzas Unidad Operativa Departamental La Paz, Individual Consultor de linea, Implementation of Rural 2016-04- 2018-04- 2016-04- 2018-04- 2016-05- 2018-04- 2016-06- 2018-04- 2016-12- IBRD / 87350 Post Consultant Direct 72,514.00 4,231.02 Signed Responsable de promover Alliances 01 17 11 17 02 17 06 17 03 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-68250- Individual Implementation of Rural 2018-06- 2014-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 33,318.00 4,904.54 Signed Alliances 28 10 08 04 29 04 02 04 01 Administrativo Pando Selection BO-EMPODERAR-68251- CS-INDV / Oficial de Alianzas Pando. Oficial de Alianzas de la Unidad Operativa Departamental Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Pando, Consultor de linea, IBRD / 87350 Post Consultant Direct 72,514.00 10,674.50 Signed Alliances 28 04 08 04 29 04 02 04 01 responsable de promover Selection alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-68252- CS-INDV / Oficial de Alianzas Pando. Oficial de Alianzas de la Unidad Operativa Departamental Individual Implementation of Rural 2018-06- 2014-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Pando Consultor de línea, IBRD / 87350 Post Consultant Direct 72,514.00 10,674.50 Signed Alliances 28 04 08 04 29 04 02 04 01 responsable de promover Selection alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-68254- CS-INDV / Analista en DO Cochabamba. Consultor de línea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- IBRD / 87350 Post Consultant Direct 62,155.00 10,849.49 Signed Operativa Departamental Alliances 28 04 08 04 29 02 04 01 Selection Cochabamba, responsable del fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-68256- CS-INDV / Oficial de Alianzas La Paz. Oficial de Alianzas de la Unidad Operativa Departamental La Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Paz Consultor de línea, IBRD / 87350 Post Consultant Direct 72,514.00 10,674.50 Signed Alliances 28 04 08 04 29 02 04 01 responsable de promover Selection alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-68285- CS-INDV / Analista en DO La Paz. Consultor de línea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- IBRD / 87350 Post Consultant Direct 62,155.00 10,674.50 Signed Operativa Departamental La Alliances 28 04 08 04 29 02 04 01 Selection Paz, responsable del fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-68287- CS-INDV / Asistente Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Administrativo Unidad IBRD / 87350 Post Consultant Direct 33,318.00 4,904.55 Signed Alliances 28 04 08 04 29 02 04 01 Operativa Departamental Selection Oruro BO-EMPODERAR-68288- Individual CS-INDV / Analista Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- IBRD / 87350 Post Consultant Direct 67,335.00 10,674.50 Signed Ambiental de la Unidad Alliances 28 04 08 04 29 04 02 04 01 Selection Operativa Departamental Oruro BO-EMPODERAR-68289- CS-INDV / Oficial de Alianzas Oruro. Oficial de Alianzas de la Unidad Operativa Departamental Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Oruro Consultor de línea, IBRD / 87350 Post Consultant Direct 72,514.00 10,674.50 Signed Alliances 28 04 08 04 29 04 02 04 01 responsable de promover Selection alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-68292- CS-INDV / Oficial de Alianzas Oruro, Oficial de Alianzas de la Unidad Operativa Departamental Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Oruro Consultor de línea, IBRD / 87350 Post Consultant Direct 74,514.00 10,674.50 Signed Alliances 28 04 08 04 29 04 02 04 01 responsable de promover Selection alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-68293- CS-INDV / Analista en DO Oruro. Consultor de línea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- IBRD / 87350 Post Consultant Direct 62,155.00 10,674.50 Signed Operativa Departamental Alliances 28 04 08 04 29 04 02 04 01 Selection Oruro, responsable del fortalecimiento de las organizaciones de pequeños productores rurales Page 7 BO-EMPODERAR-68297- CS-INDV / Oficial de Alianzas Potosi. Oficial de Alianzas de la Unidad Operativa Departamental Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Potosi Consultor de línea, IBRD / 87350 Post Consultant Direct 72,514.00 10,857.35 Signed Alliances 28 04 08 04 29 04 02 04 01 responsable de promover Selection alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-68298- CS-INDV / Oficial de Alianzas Potosi. Oficial de Alianzas de la Unidad Operativa Departamental Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Potosi Consultor de línea, IBRD / 87350 Post Consultant Direct 72,514.00 10,857.35 Signed Alliances 28 04 08 04 29 04 02 04 01 responsable de promover Selection alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-68299- Individual CS-INDV / Analista Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- IBRD / 87350 Post Consultant Direct 67,335.00 10,857.35 Signed Ambiental Unidad Operativa Alliances 28 04 08 04 29 04 02 04 01 Selection Departamental Potosi BO-EMPODERAR-68300- CS-INDV / Asistente Individual Implementation of Rural 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- Asministrativo Unidad IBRD / 87350 Post Consultant Direct 33,318.00 4,988.56 Signed Alliances 28 04 08 04 29 04 02 04 01 Operativa Regional Pando Selection (Sub Regional Riberalta) BO-EMPODERAR-68305- CS-INDV / 100 acompañantes para apoyar a la Unidad de Individual Coordinacion Nacional y las Implementation of Rural Under 2018-06- 2018-07- 2018-07- 2018-07- 2018-09- 2019-03- IBRD / 87350 Post Consultant Direct 22,000.00 0.00 unidades operativas Alliances Implementation 28 08 05 29 02 01 Selection departamentales en actividades de las areas administrativa, social y ambiental, comunicacion, legal y negocios BO-EMPODERAR-57015- Individual Implementation of Rural 2018-04- 2018-04- 2018-05- 2018-06- 2018-12- CS-INDV / Analista de IBRD / 87350 Post Consultant Direct 68,786.00 0.00 Canceled Alliances 01 11 02 06 03 Adquisiciones 2 Selection BO-EMPODERAR-57826- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 55,407.00 0.00 Canceled Alliances 16 04 25 30 26 adquisiciones Selection BO-EMPODERAR-58124- Individual Implementation of Rural 2018-04- 2018-08- 2018-04- 2018-08- 2018-05- 2018-08- 2018-06- 2018-08- 2018-12- CS-INDV / Analista de IBRD / 87350 Post Consultant Direct 68,786.00 8,582.91 Signed Alliances 10 01 20 01 11 01 15 01 12 sistemas 2 Selection BO-EMPODERAR-71910- Implementation of Rural Under 2018-07- 2020-11- 2018-08- 2018-10- 2019-04- CS-INDV / Analista IBRD / 87350 Post Direct Selection Direct 72,857.00 0.00 Alliances Implementation 27 03 06 10 08 ambiental de la UOD La Paz BO-EMPODERAR-71949- CS-CDS / Seleccion de personal tecnico de la Implementation of Rural 2018-07- 2018-04- 2018-08- 2018-04- 2018-10- 2018-09- 2019-04- IBRD / 87350 Post Direct Selection Direct 10,000.00 5,502.68 Signed unidad de coordinacion Alliances 27 09 06 20 10 13 08 nacional y las unidades operativas departamentales del PAR II BO-EMPODERAR-71902- Implementation of Rural Under 2018-07- 2020-11- 2018-08- 2018-10- 2019-04- CS-CDS / Asistente de IBRD / 87350 Post Direct Selection Direct 59,953.00 0.00 Alliances Implementation 27 03 06 10 08 Adquisiciones BO-EMPODERAR-77175- Individual Project Management, 2018-09- 2018-09- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-06- CS-INDV / Contratación IBRD / 87350 Post Consultant Open 53,987.00 1,340.16 Terminated Monitoring and Evaluation 06 16 25 23 15 04 20 04 18 Asistente de sistemas Selection BO-EMPODERAR-57785- Individual CS-INDV / Especialista Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 79,561.00 0.00 Canceled Fortalecimiento Alliances 16 04 25 30 26 Selection Organizacional BO-EMPODERAR-78970- Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Especialista en IBRD / 87350 Post Consultant Direct 79,561.00 5,029.98 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Desarrollo Organizacional Selection BO-EMPODERAR-57854- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Especialista IBRD / 87350 Post Consultant Open 79,561.00 0.00 Canceled Alliances 16 04 25 30 26 ambiental Selection BO-EMPODERAR-79006- Individual Project Management, 2018-09- 2018-12- 2018-09- 2018-12- 2018-10- 2018-12- 2018-11- 2018-12- 2019-05- CS-INDV / Especialista IBRD / 87350 Post Consultant Direct 79,561.00 1,786.97 Signed Monitoring and Evaluation 20 04 30 04 21 04 25 04 24 Ambiental Selection BO-EMPODERAR-57730- CS-INDV / Oficial de alianza Cochabamba:Oficial de Alianzas Unidad Operativa Departamental Individual cochabamba, Consultor de Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled linea, Responsable de Alliances 16 04 25 30 26 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-79013- CS-INDV / Oficial de Alianza Cochabamba: Oficial de Alianzas Unidad Operativa Departamental de Individual Cochabamba, Consultor de Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- IBRD / 87350 Post Consultant Direct 72,514.00 4,584.21 Signed Línea, Responsable de Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planos de alianza. BO-EMPODERAR-68294- CS-INDV / Oficial de Alianzas Chuquisaca. Oficial de Alianzas de la Unidad Operativa Individual Implementation of Rural 2018-06- 2018-10- 2018-07- 2018-07- 2018-09- 2019-03- Departamental Chuquisaca IBRD / 87350 Post Consultant Direct 72,514.00 0.00 Canceled Alliances 28 16 08 29 02 01 Consultor de línea, Selection responsable de promover alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-79015- CS-INDV / Oficial de Alianzas Chuquisaca. Oficial de Alianzas de la Unidad Operativa Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- Departamental Chuquisaca IBRD / 87350 Post Consultant Direct 72,514.00 4,584.21 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Consultor de línea, Selection responsable de promover alianzas rurales, supervisar a los facilitadores y acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-57472- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Alliances 16 04 25 30 26 fiduciario La Paz Selection BO-EMPODERAR-79022- Individual Project Management, 2018-09- 2018-09- 2018-10- 2018-11- 2019-05- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 0.00 Canceled Monitoring and Evaluation 20 30 21 25 24 fiduciario La Paz Selection BO-EMPODERAR-57844- CS-INDV / Operador Oruro: Consultor de linea. Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- Operador Departamental de IBRD / 87350 Post Consultant Open 98,094.00 0.00 Canceled Alliances 16 04 25 30 26 la Unidad Operativa Selection Departamental Oruro. Responsable de la Unidad BO-EMPODERAR-79028- CS-INDV / Operador Oruro: Consultor de linea. Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- Operador Departamental de IBRD / 87350 Post Consultant Direct 98,094.00 6,201.44 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 la Unidad Operativa Selection Departamental Oruro. Responsable de la Unidad BO-EMPODERAR-57736- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Alliances 16 04 25 30 26 fiduciario Oruro Selection BO-EMPODERAR-79031- Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,584.21 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Fiduciario Oruro Selection BO-EMPODERAR-57765- CS-INDV / Operador Pando: Consultor de linea. Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- Operador Departamental de IBRD / 87350 Post Consultant Open 98,094.00 0.00 Canceled Alliances 16 04 25 30 26 la Unidad Operativa Selection Departamental Pando. Responsable de la Unidad BO-EMPODERAR-79033- CS-INDV / Operador Pando: Consultor de linea. Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- Operador Departamental de IBRD / 87350 Post Consultant Direct 98,094.00 6,201.44 Terminated Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 la Unidad Operativa Selection Departamental Pando. Responsable de la Unidad BO-EMPODERAR-57459- CS-INDV / Analista en DO Potosí: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 87350 Post Consultant Open 62,155.00 0.00 Canceled Operativa Departamental Alliances 16 04 25 30 26 Selection Potosí, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-79036- CS-INDV / Analista en DO Potosí: Consultor de linea Analista en Desarrollo Individual Organizacional de la Unidad Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- IBRD / 87350 Post Consultant Direct 62,155.00 4,584.21 Signed Operativa Departamental Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Selection Potosí, Responsable del Fortalecimiento de las organizaciones de pequeños productores rurales BO-EMPODERAR-57778- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Alliances 16 04 25 30 26 fiduciario Potosí Selection BO-EMPODERAR-79040- Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,577.58 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Fiduciario Potosí Selection BO-EMPODERAR-79055- CS-INDV / Oficial de alianza Santa Cruz: Oficial de Alianzas Unidad Operativa Departamental Individual Santa Cruz, Consultor de Project Management, 2018-09- 2018-09- 2018-11- 2018-11- 2018-11- 2018-12- 2019-01- 2018-12- 2019-07- IBRD / 87350 Post Consultant Open 72,514.00 1,447.65 Signed linea, Responsable de Monitoring and Evaluation 20 16 08 23 29 07 03 07 02 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-79056- Individual Project Management, 2018-09- 2018-08- 2018-09- 2018-08- 2018-10- 2018-08- 2018-11- 2018-08- 2019-05- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 63,872.00 8,582.91 Signed Monitoring and Evaluation 20 01 30 01 21 01 25 01 24 Financiero 2 Selection BO-EMPODERAR-79058- CS-INDV / Auxiliar Individual Project Management, 2018-09- 2018-09- 2018-10- 2018-11- 2019-05- Administrativo de la Unidad IBRD / 87350 Post Consultant Direct 31,804.45 0.00 Canceled Monitoring and Evaluation 20 30 21 25 24 de Coordinación Nacional Selection (UCN) BO-EMPODERAR-79059- Individual CS-INDV / Secretaria de la Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- IBRD / 87350 Post Consultant Direct 36,781.34 22,448.52 Signed Unidad de Coordinacion Monitoring and Evaluation 20 01 30 01 21 01 25 01 24 Selection Nacional (UCN) BO-EMPODERAR-57752- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 30,938.00 0.00 Canceled Alliances 16 04 25 30 26 mensajero Oruro Selection BO-EMPODERAR-79062- Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 2,106.28 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 mensajero Oruro Selection BO-EMPODERAR-57824- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 30,938.00 0.00 Canceled Alliances 16 04 25 30 26 mensajero Potosí Selection BO-EMPODERAR-79065- Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 2,106.28 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Mensajero Potosi Selection Page 8 BO-EMPODERAR-57720- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Asistente IBRD / 87350 Post Consultant Open 30,938.00 0.00 Canceled Alliances 16 04 25 30 26 mensajero Pando Selection BO-EMPODERAR-79067- Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 2,106.28 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 mensajero Pando Selection BO-EMPODERAR-79068- Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Asistente IBRD / 87350 Post Consultant Direct 30,938.00 2,106.28 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 mensajero Pando Selection (Subregional Riberalta) BO-EMPODERAR-79069- Individual CS-INDV / Asistente Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- IBRD / 87350 Post Consultant Direct 30,938.00 2,106.28 Signed mensajero La Paz ( Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Selection Subregional Rurrenabaque) BO-EMPODERAR-79070- Individual Project Management, 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,584.21 Signed Monitoring and Evaluation 20 16 30 16 21 16 25 16 24 Fiduciario Pando Selection (Subregional Riberalta) BO-EMPODERAR-57473- Individual Implementation of Rural 2018-04- 2018-06- 2018-06- 2018-07- 2019-01- CS-INDV / Analista IBRD / 87350 Post Consultant Open 72,514.00 0.00 Canceled Alliances 16 04 25 30 26 fiduciario Beni Selection BO-EMPODERAR-79259- Individual Project Management, 2018-09- 2018-10- 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-05- CS-INDV / Analista IBRD / 87350 Post Consultant Direct 72,514.00 4,584.21 Signed Monitoring and Evaluation 21 16 01 16 22 16 26 16 25 Fiduciario Beni Selection BO-EMPODERAR-86078- Individual CS-INDV / Contratación de Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-04- 2019-08- 2020-04- IBRD / 87350 Post Consultant Open 25,000.00 50,687.90 Completed consultores evaluadores de Alliances 06 20 25 14 15 15 19 17 18 16 Selection planes de alianza UOD La Paz BO-EMPODERAR-86079- Individual CS-INDV / Contratación de Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-03- 2019-08- 2020-09- IBRD / 87350 Post Consultant Open 25,000.00 60,825.48 Signed consultores evaluadores de Alliances 06 27 25 13 15 15 19 21 18 16 Selection planes de alianza UOD Oruro BO-EMPODERAR-86080- Individual CS-INDV / Contratación de Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-04- 2019-01- 2019-04- 2019-02- 2019-05- 2019-08- 2020-05- IBRD / 87350 Post Consultant Open 25,000.00 40,550.32 Completed consultores evaluadores de Alliances 06 24 25 04 15 08 19 20 18 19 Selection planes de alianza UOD Potosí BO-EMPODERAR-86081- CS-INDV / Contratación de Individual Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-04- 2019-01- 2019-04- 2019-02- 2019-04- 2019-08- 2020-04- consultores evaluadores de IBRD / 87350 Post Consultant Open 25,000.00 40,550.32 Completed Alliances 06 24 25 01 15 02 19 23 18 22 planes de alianza UOD Selection Cochabamba BO-EMPODERAR-86082- CS-INDV / Contratación de Individual Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-04- 2019-08- 2020-08- consultores evaluadores de IBRD / 87350 Post Consultant Open 25,000.00 40,491.68 Completed Alliances 06 20 25 22 15 27 19 03 18 31 planes de alianza UOD Selection Chuquisaca BO-EMPODERAR-86083- Individual CS-INDV / Contratación de Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-03- 2019-08- 2020-03- IBRD / 87350 Post Consultant Open 25,000.00 20,275.16 Completed consultores evaluadores de Alliances 06 21 25 18 15 21 19 22 18 21 Selection planes de alianza UOD Tarija BO-EMPODERAR-86084- CS-INDV / Contratación de Individual Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-12- 2019-08- consultores evaluadores de IBRD / 87350 Post Consultant Open 25,000.00 60,825.48 Signed Alliances 06 20 25 25 15 25 19 05 18 planes de alianza UOD Selection Santa Cruz BO-EMPODERAR-86085- Individual CS-INDV / Contratación de Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-04- 2019-01- 2019-04- 2019-02- 2019-07- 2019-08- IBRD / 87350 Post Consultant Open 25,000.00 30,368.76 Signed consultores evaluadores de Alliances 06 20 25 05 15 09 19 17 18 Selection planes de alianza UOD Beni BO-EMPODERAR-86086- Individual CS-INDV / Contratación de Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-06- 2019-08- 2020-06- IBRD / 87350 Post Consultant Open 25,000.00 70,963.06 Completed consultores evaluadores de Alliances 06 20 25 22 15 26 19 03 18 02 Selection planes de alianza UOD Pando BO-EMPODERAR-86087- Individual CS-INDV / Contratación de Implementation of Rural 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-03- 2019-08- 2020-03- IBRD / 87350 Post Consultant Open 25,000.00 18,247.64 Completed consultores evaluadores de Alliances 06 21 25 27 15 28 19 28 18 27 Selection planes de alianza UOR Chaco BO-EMPODERAR-86289- Individual Project Management, 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-07- CS-INDV / Especialista IBRD / 87350 Post Consultant Direct 79,561.00 1,786.97 Signed Monitoring and Evaluation 08 04 18 04 09 04 13 04 12 Financiero UCN Selection BO-EMPODERAR-88443- CS-CDS / Evaluación técnica del personal de la Unidad de Coordinación Project Management, 2018-11- 2018-12- 2019-02- 2019-08- Nacional y de las unidades IBRD / 87350 Post Direct Selection Direct 75,000.00 0.00 Canceled Monitoring and Evaluation 27 07 10 09 operativas departamentales del Proyecto de Alianzas Rurales correspondiente a las gestiones 2018, 2019 y 2020 BO-EMPODERAR-98357- CS-INDV / Contratación Individual Under 2019-02- 2018-07- 2019-03- 2018-12- 2019-04- 2019-04- 2019-05- 2019-11- facilitadores para la IBRD / 87350 Institutional Strengthening Post Consultant Open 335,000.00 0.00 Implementation 01 16 22 07 12 12 17 13 formulación de planes de Selection negocios, gestión 2019 BO-EMPODERAR-98365- CS-INDV / Contratación Individual 2019-02- 2019-02- 2019-03- 2019-04- 2019-05- 2019-11- acompañantes para la IBRD / 87350 Institutional Strengthening Post Consultant Open 160,000.00 0.00 Canceled 01 01 22 12 17 13 ejecución de ALIANZAS, Selection gestión 2019 BO-EMPODERAR-98366- CS-INDV / Contratación Individual Project Management, 2019-02- 2018-07- 2019-03- 2018-07- 2019-04- 2018-07- 2019-05- 2018-08- 2019-11- 2019-02- acompañantes para apoyar IBRD / 87350 Post Consultant Open 28,863.00 6,154.95 Completed Monitoring and Evaluation 01 05 22 05 12 05 17 24 13 12 a la UCN y las UOD's, Selection gestión 2019 BO-EMPODERAR-98379- CS-CDS / Actualización y Project Management, 2019-02- 2019-02- 2019-04- 2019-10- IBRD / 87350 Post Direct Selection Direct 49,000.00 0.00 Canceled mejoramiento del Sistema Monitoring and Evaluation 01 11 17 14 de información pública BO-EMPODERAR-114474- CS-CDS / SELECCIÓN DEL PERSONAL TECNICO PARA LA UNIDAD DE Implementation of Rural 2019-05- 2019-05- 2019-05- 2019-05- 2019-07- 2019-05- 2020-01- IBRD / 87350 Post Direct Selection Direct 10,000.00 8,647.07 Signed COORDINACION NACIONAL Alliances 10 22 20 22 24 24 20 Y LAS UNIDADES OPERATIVAS DEPARTAMENTALES DEL PAR II (2019) BO-EMPODERAR-127554- Individual 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-08- 2020-05- CS-INDV / Analista IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,660.46 Signed 16 26 04 29 25 26 29 26 27 ambiental La Paz Selection BO-EMPODERAR-127557- CS-INDV / Analista en DO La Paz: Consultor de linea Analista en Desarrollo Individual 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-08- 2020-05- Organizacional de la Unidad IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,557.47 Signed 16 26 04 29 25 26 29 26 27 Operativa Departamental La Selection Paz, Responsable del Fortalecimiento de las organizaciones BO-EMPODERAR-127559- CS-INDV / Oficial de alianza La Paz: Oficial de Alianzas Unidad Operativa Departamental La Paz - Individual Rurrenabaque, Consultor de 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-09- 2019-11- 2019-09- 2020-05- IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,140.91 Signed linea, Responsable de 16 26 04 29 25 02 29 02 27 Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianzas BO-EMPODERAR-127560- Individual 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-08- 2020-05- CS-INDV / Analista IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,557.47 Signed 16 26 04 29 25 26 29 26 27 fiduciario La Paz - Selection Rurrenabaque BO-EMPODERAR-127562- Individual CS-INDV / Oficial de 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-08- 2020-05- IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,660.46 Signed infraestructura y riego 16 26 04 29 25 26 29 26 27 Selection Pando -Cobija BO-EMPODERAR-127564- Individual 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-08- 2020-05- CS-INDV / Analista IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,616.97 Signed 16 26 04 29 25 23 29 23 27 fiduciario Pando - Cobija Selection BO-EMPODERAR-127565- CS-INDV / Oficial de alianza Pando: Oficial de Alianzas Unidad Operativa Departamental Pando - Individual 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-09- 2019-11- 2019-09- 2020-05- Riberalta, Consultor de IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,140.91 Signed 16 26 04 29 25 02 29 02 27 linea, Responsable de Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-127567- Individual 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-09- 2019-11- 2019-09- 2020-05- CS-INDV / Analista IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,140.91 Signed 16 26 04 29 25 02 29 02 27 fiduciario Pando - Riberalta Selection BO-EMPODERAR-127568- CS-INDV / Oficial de alianza Potosi: Oficial de Alianzas Unidad Operativa Departamental Potosi - Individual 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-08- 2020-05- Camargo, Consultor de IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,795.50 Signed 16 26 04 29 25 22 29 22 27 linea, Responsable de Selection promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza BO-EMPODERAR-127571- Individual CS-INDV / Oficial de 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-08- 2020-05- IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,660.46 Signed infraestructura y riego 16 26 04 29 25 26 29 26 27 Selection Santa Cruz BO-EMPODERAR-127572- Individual 2019-08- 2019-05- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-08- 2020-05- CS-INDV / Oficial de IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 7,660.46 Signed 16 26 04 29 25 26 29 26 27 infraestructura y riego Selection Tarija BO-EMPODERAR-127573- Individual CS-INDV / Oficial de 2019-08- 2019-10- 2019-10- 2019-11- 2020-05- IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 0.00 Canceled infraestructura y riego Beni 16 04 25 29 27 Selection - Trinidad BO-EMPODERAR-127575- CS-INDV / Oficial de alianza Tarija: Oficial de Alianzas Unidad Operativa Departamental Tarija, Individual Consultor de linea, 2019-08- 2019-10- 2019-10- 2019-11- 2020-05- IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 0.00 Canceled Responsable de promover 16 04 25 29 27 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de alianza. BO-EMPODERAR-127577- CS-INDV / Oficial de alianza Beni: Oficial de Alianzas Unidad Operativa Individual Departamental Beni - 2019-08- 2019-10- 2019-10- 2019-11- 2020-05- IBRD / 87350 Institutional Strengthening Post Consultant Open 53,060.00 0.00 Canceled Trinidad, Consultor de 16 04 25 29 27 Selection linea, Responsable de promover alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes de BO-EMPODERAR-127580- alianza Individual 2019-08- 2019-09- 2019-08- 2019-09- 2019-09- 2019-09- 2019-10- 2019-09- 2020-04- CS-INDV / Analista IBRD / 87350 Institutional Strengthening Post Consultant Direct 53,060.00 6,212.82 Signed 16 19 26 19 16 19 21 19 18 fiduciario La Paz Selection BO-EMPODERAR-127614- Individual Under 2019-08- 2020-11- 2019-10- 2019-10- 2019-11- 2020-05- CS-INDV / Asistente IBRD / 87350 Institutional Strengthening Post Consultant Open 4,185.00 0.00 Implementation 16 03 04 25 29 27 administrativo Pando Selection BO-EMPODERAR-127619- Individual Under 2019-08- 2020-11- 2019-10- 2019-10- 2019-11- 2020-05- CS-INDV / Asistente IBRD / 87350 Institutional Strengthening Post Consultant Open 4,185.00 0.00 Implementation 16 03 04 25 29 27 mensajero UOD Pando - Selection Cobija BO-EMPODERAR-128530- Individual 2019-08- 2019-09- 2019-08- 2019-09- 2019-09- 2019-09- 2019-10- 2019-09- 2020-04- CS-INDV / ANALISTA IBRD / 87350 Institutional Strengthening Post Consultant Direct 53,060.00 7,021.90 Signed 21 04 31 04 21 04 26 04 23 FIDUCIARIO CAMARGO Selection BO-EMPODERAR-136316- Individual CS-INDV / Evaluación de 2019-09- 2019-09- 2019-11- 2019-12- 2020-01- 2020-07- IBRD / 87350 Institutional Strengthening Post Consultant Open 13,120.00 0.00 Canceled impacto para el 27 18 15 06 10 08 Selection financiamiento inicial del PAR II BO-EMPODERAR-152029- CS-INDV / Oficial de Alianzas Unidad Operativa Departamental Santa Cruz, Individual Consultor de linea, Project Management, 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2020-01- 2020-08- IBRD / 87350 Post Consultant Direct 21,858.00 22,583.63 Signed Responsable de promover Monitoring and Evaluation 27 02 06 02 27 02 02 02 29 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes Page 9 BO-EMPODERAR-152034- CS-INDV / Contratación Oficial de Alianzas Unidad Operativa Ragional Chaco, Individual Project Management, 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2020-01- 2020-08- Consultor de linea, IBRD / 87350 Post Consultant Direct 21,858.00 22,583.63 Signed Monitoring and Evaluation 27 02 06 02 27 02 02 02 29 Responsable de promover Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes BO-EMPODERAR-152035- CS-INDV / Oficial de Alianzas Unidad Operativa Departamental Beni, Individual Project Management, 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2020-01- 2020-08- Consultor de linea, IBRD / 87350 Post Consultant Direct 21,858.00 22,583.63 Signed Monitoring and Evaluation 27 02 06 02 27 02 02 02 29 Responsable de promover Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes BO-EMPODERAR-152036- CS-INDV / Oficial de Alianzas Unidad Operativa Departamental Tarija, Individual Consultor de linea, Project Management, 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2020-01- 2020-08- IBRD / 87350 Post Consultant Direct 21,858.00 22,583.63 Signed Responsable de promover Monitoring and Evaluation 27 02 06 02 27 02 02 02 29 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes BO-EMPODERAR-152037- Individual CS-INDV / Analista Project Management, Under 2019-12- 2020-11- 2020-01- 2020-01- 2020-03- 2020-08- IBRD / 87350 Post Consultant Direct 21,858.00 0.00 Ambiental de la Unidad Monitoring and Evaluation Implementation 27 03 06 27 02 29 Selection Operativa Departamental Beni BO-EMPODERAR-152039- CS-INDV / Oficial de Alianzas Unidad Operativa Departamental Chuquisaca, Individual Consultor de linea, Project Management, 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2020-01- 2020-08- 2020-12- IBRD / 87350 Post Consultant Direct 21,858.00 22,583.63 Completed Responsable de promover Monitoring and Evaluation 27 02 06 02 27 02 02 02 29 31 Selection alianzas rurales, supervisar a los Facilitadores y Acompañantes, evaluar los proyectos de planes BO-EMPODERAR-152040- Individual CS-INDV / Chofer Unidad Project Management, 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2020-01- 2020-08- IBRD / 87350 Post Consultant Direct 10,445.00 10,376.83 Signed Operativa Departamental Monitoring and Evaluation 27 02 06 02 27 02 02 02 29 Selection Potosí BO-EMPODERAR-152041- CS-INDV / Asistente Individual Project Management, Under 2019-12- 2020-11- 2020-02- 2020-03- 2020-04- 2020-10- Administrativo - Secretaria IBRD / 87350 Post Consultant Open 10,445.00 0.00 Monitoring and Evaluation Implementation 27 03 14 06 10 07 Unidad Operativa Selection Departamental Chuquisaca BO-EMPODERAR-127582- Individual 2019-08- 2019-08- 2019-09- 2019-10- 2020-04- CS-INDV / Analista IBRD / 87350 Institutional Strengthening Post Consultant Direct 53,060.00 0.00 Canceled 16 26 16 21 18 ambiental Chuquisaca Selection BO-EMPODERAR-153483- CS-INDV / Contratación Individual Project Management, 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- consultor de linea: IBRD / 87350 Post Consultant Open 41,569.00 0.00 Canceled Monitoring and Evaluation 13 02 23 27 24 Especialista Ambiental de la Selection Unidad de Coordinación Nacional BO-EMPODERAR-153485- CS-INDV / Contratación Individual Project Management, 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- consultor de linea: IBRD / 87350 Post Consultant Open 51,251.00 0.00 Canceled Monitoring and Evaluation 13 02 23 27 24 Operador de la Unidad Selection Operativa Departamental Cochabamba BO-EMPODERAR-153486- CS-INDV / Contratación Individual Project Management, 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- consultor de linea: Oficial IBRD / 87350 Post Consultant Open 37,887.00 0.00 Canceled Monitoring and Evaluation 13 02 23 27 24 de Alianzas de la Unidad Selection Operativa Regional Chaco BO-EMPODERAR-153487- CS-INDV / Contratación Individual Project Management, 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- consultor de linea: Analista IBRD / 87350 Post Consultant Open 37,887.00 0.00 Canceled Monitoring and Evaluation 13 02 23 27 24 Ambiental de la Unidad Selection Operativa Regional Chaco BO-EMPODERAR-153489- CS-INDV / Contratación Individual Project Management, 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- consultor de linea: Analista IBRD / 87350 Post Consultant Open 37,887.00 0.00 Canceled Monitoring and Evaluation 13 02 23 27 24 Ambiental de la UNidad Selection Operativa Departamental Chuquisaca BO-EMPODERAR-153491- CS-INDV / Contratación Individual Project Management, 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- consultor de linea: Oficial IBRD / 87350 Post Consultant Open 37,887.00 0.00 Canceled Monitoring and Evaluation 13 02 23 27 24 de Alianzas de la Unidad Selection Operativa Departamental La Paz BO-EMPODERAR-153492- CS-INDV / Contratación Individual consultor de linea: Oficial Project Management, 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Post Consultant Open 37,887.00 0.00 Canceled de Infraestructura y riego Monitoring and Evaluation 13 02 23 27 24 Selection de la Unidad Operativa Departamental Oruro BO-EMPODERAR-153493- CS-INDV / Contratación Individual consultor de linea: Oficial Project Management, 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Post Consultant Open 37,887.00 0.00 Canceled de Infraestructura y Riego Monitoring and Evaluation 13 02 23 27 24 Selection de la Unidad Operativa Departamental Santa Cruz BO-EMPODERAR-153494- CS-INDV / Contratación Individual consultor de linea: Analista Project Management, Pending 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Post Consultant Open 37,887.00 0.00 en Desarrollo Monitoring and Evaluation Implementation 13 02 23 27 24 Selection Organizacional de la Unidad Operativa Departamental Tarija BO-EMPODERAR-153835- CS-CDS / Contratación Project Management, 2020-01- 2020-01- 2020-01- 2020-03- 2020-03- 2020-03- 2020-09- IBRD / 87350 Post Direct Selection Direct 24,000.00 34,238.06 Signed auditoria financiera Monitoring and Evaluation 14 21 24 02 29 18 25 correspondiente a la gestión 2019 BO-EMPODERAR-153730- CS-INDV / Contratación de 6 consultores por producto: Individual 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled 14 03 24 28 25 formulación de planos de Selection alianza en la Unidad Operativa Departamental Cochabamba BO-EMPODERAR-154614- CS-INDV / Contratación de 6 consultores por producto: Individual 2020-01- 2020-11- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2020-02- 2020-10- 2020-12- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 33,723.39 Completed 14 03 03 17 24 19 28 19 25 30 formulación de planos de Selection alianza en la Unidad Operativa Departamental Chuquisaca BO-EMPODERAR-153776- CS-INDV / Contratación de 15 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Operativa Departamental La IBRD / 87350 Post Consultant Open 100,346.00 0.00 Alliances Implementation 14 03 03 24 28 25 Paz (Responsables de la Selection ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153745- CS-INDV / Contratación de Individual 4 consultores por producto: 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled Evaluadores de planes de 14 03 24 28 25 Selection alianza en la Unidad Operativa Departamental Chuquisaca BO-EMPODERAR-153751- CS-INDV / Contratación de Individual 4 consultores por producto: 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled Evaluadores de planes de 14 03 24 28 25 Selection alianza en la Unidad Operativa Departamental Oruro BO-EMPODERAR-153783- CS-INDV / Contratación de 15 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Operativa Departamental IBRD / 87350 Post Consultant Open 98,814.00 0.00 Alliances Implementation 14 03 03 24 28 25 Santa Cruz (Responsables Selection de la ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153770- CS-INDV / Contratación de 15 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Operativa Departamental IBRD / 87350 Post Consultant Open 100,346.00 0.00 Alliances Implementation 14 03 03 24 28 25 Chuquisaca (Responsables Selection de la ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153752- CS-INDV / Contratación de Individual 4 consultores por producto: 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled Evaluadores de planes de 14 03 24 28 25 Selection alianza en la Unidad Operativa Departamental Pando BO-EMPODERAR-153737- CS-INDV / Contratación de 6 consultores por producto: Individual 2020-01- 2020-11- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-10- 2020-10- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 31,266.13 Completed 14 03 03 05 24 05 28 05 25 29 formulación de planos de Selection alianza en la Unidad Operativa Departamental Potosí BO-EMPODERAR-153741- CS-INDV / Contratación de 6 consultores por producto: Individual 2020-01- 2020-11- 2020-03- 2020-08- 2020-03- 2020-08- 2020-04- 2020-08- 2020-10- 2020-10- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 12,377.00 18,544.55 Completed 14 03 03 11 24 11 28 17 25 29 formulación de planos de Selection alianza en la Unidad Operativa Departamental Tarija BO-EMPODERAR-153735- CS-INDV / Contratación de 6 consultores por producto: Individual Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Implementation 14 03 03 24 28 25 formulación de planos de Selection alianza en la Unidad Operativa Departamental Oruro BO-EMPODERAR-153744- CS-INDV / Contratación de Individual 4 consultores por producto: 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled Evaluadores de planes de 14 03 24 28 25 Selection alianza en la Unidad Operativa Regional Chaco BO-EMPODERAR-153764- CS-INDV / Contratación de 6 consultores por producto: Acompañantes de alianza en la Unidad Operativa Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Departamental Beni IBRD / 87350 Post Consultant Open 35,236.00 0.00 Alliances Implementation 14 03 03 24 28 25 (Responsables de la Selection ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153725- CS-INDV / Contratación de 6 consultores por producto: Individual 2020-01- 2020-11- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-09- 2020-10- 2020-12- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 10,398.84 Completed 14 03 03 04 24 04 28 24 25 29 formulación de planos de Selection alianza en la Unidad Operativa Departamental Beni BO-EMPODERAR-153736- CS-INDV / Contratación de 6 consultores por producto: Individual 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled 14 03 24 28 25 formulación de planos de Selection alianza en la Unidad Operativa Departamental Pando BO-EMPODERAR-153747- CS-INDV / Contratación de Individual 4 consultores por producto: 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled Evaluadores de planes de 14 03 24 28 25 Selection alianza en la Unidad Operativa Departamental Cochabamba BO-EMPODERAR-153726- CS-INDV / Contratación de 6 consultores por producto: Individual 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled 14 03 24 28 25 formulación de planos de Selection alianza en la Unidad Operativa Regional Chaco Page 10 BO-EMPODERAR-153767- CS-INDV / Contratación de 12 consultores por producto: Acompañantes Individual de alianza en la Unidad Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Post Consultant Open 75,068.00 0.00 Operativa Regional Chaco Alliances Implementation 14 03 03 24 28 25 Selection (Responsables de la ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153781- CS-INDV / Contratación de 15 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Operativa Departamental IBRD / 87350 Post Consultant Open 98,814.00 0.00 Alliances Implementation 14 03 03 24 28 25 Potosí (Responsables de la Selection ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153739- CS-INDV / Contratación de 6 consultores por producto: Individual Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Implementation 14 03 03 24 28 25 formulación de planos de Selection alianza en la Unidad Operativa Departamental Santa Cruz BO-EMPODERAR-153754- CS-INDV / Contratación de Individual 4 consultores por producto: 2020-01- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Canceled Evaluadores de planes de 14 03 24 28 25 Selection alianza en la Unidad Operativa Departamental Santa Cruz BO-EMPODERAR-153756- CS-INDV / Contratación de Individual 4 consultores por producto: Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 14,150.00 0.00 Evaluadores de planes de Implementation 14 03 03 24 28 25 Selection alianza en la Unidad Operativa Departamental Tarija BO-EMPODERAR-153784- CS-INDV / Contratación de 15 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Operativa Departamental IBRD / 87350 Post Consultant Open 98,814.00 0.00 Alliances Implementation 14 03 03 24 28 25 Tarija (Responsables de la Selection ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153743- CS-INDV / Contratación de Individual 4 consultores por producto: Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Evaluadores de planes de Implementation 14 03 03 24 28 25 Selection alianza en la Unidad Operativa Departamental Beni BO-EMPODERAR-153753- CS-INDV / Contratación de Individual 4 consultores por producto: Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Evaluadores de planes de Implementation 14 03 03 24 28 25 Selection alianza en la Unidad Operativa Departamental Potosí BO-EMPODERAR-153777- CS-INDV / Contratación de 15 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Operativa Departamental IBRD / 87350 Post Consultant Open 98,814.00 0.00 Alliances Implementation 14 03 03 24 28 25 Oruro (Responsables de la Selection ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153779- CS-INDV / Contratación de 15 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Operativa Departamental IBRD / 87350 Post Consultant Open 98,814.00 0.00 Alliances Implementation 14 03 03 24 28 25 Pando (Responsables de la Selection ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153774- CS-INDV / Contratación de 15 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- Operativa Departamental IBRD / 87350 Post Consultant Open 98,814.00 0.00 Alliances Implementation 14 03 03 24 28 25 Cochabamba (Responsables Selection de la ejecución de planes de alianza, de la implementación física, financiera y técnica y de planes de alianza) BO-EMPODERAR-153734- CS-INDV / Contratación de 6 consultores por producto: Individual 2020-01- 2020-11- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2020-02- 2020-10- 2020-09- Facilitadores, para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 24,923.97 Completed 14 03 03 27 24 27 28 28 25 30 formulación de planos de Selection alianza en la Unidad Operativa Departamental La Paz BO-EMPODERAR-153750- CS-INDV / Contratación de Individual 4 consultores por producto: Under 2020-01- 2020-11- 2020-03- 2020-03- 2020-04- 2020-10- IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Evaluadores de planes de Implementation 14 03 03 24 28 25 Selection alianza en la Unidad Operativa Departamental La Paz BO-EMPODERAR-162151- CS-INDV / Contratación de 6 consultores por producto: Individual Under 2020-02- 2020-11- 2020-04- 2020-05- 2020-06- 2020-12- Facilitadores para la IBRD / 87350 Institutional Strengthening Post Consultant Open 10,000.00 0.00 Implementation 28 03 17 08 12 09 formulación de planes de Selection alianza en la Unidad Operativa Departamental Oruro BO-EMPODERAR-162622- CS-INDV / Contratación de 5 consultores por producto: Acompañantes de alianza Individual en la Unidad Operativa Implementation of Rural Under 2020-03- 2020-11- 2020-04- 2020-05- 2020-06- 2020-12- IBRD / 87350 Post Consultant Open 31,279.00 0.00 Regional Chaco Alliances Implementation 03 03 21 12 16 13 Selection (Responsables de la ejecución de planos de alianza, de la implementación física, financiera y técnica y de planos de alianza) BO-EMPODERAR-175908- CS-INDV / Contratación Individual Project Management, 2020-05- 2020-06- 2020-06- 2020-06- 2020-06- 2020-06- 2020-08- 2020-06- 2021-01- Especialista en IBRD / 87350 Post Consultant Direct 36,050.00 13,131.18 Terminated Monitoring and Evaluation 27 16 06 16 27 16 01 16 28 Infraestructura y Riego de Selection la Unidad de Coordinación Nacional BO-EMPODERAR-175919- CS-INDV / Contratación de un consultor individual por Individual Project Management, 2020-05- 2020-06- 2020-06- 2020-08- 2021-01- producto para la revisión y IBRD / 87350 Post Consultant Direct 8,985.00 0.00 Canceled Monitoring and Evaluation 27 06 27 01 28 viabilización de planes de Selection alianza previamente rechazados BO-EMPODERAR-175240- CS-INDV / Contratación de un consultor individual por producto para facilitar el Individual Project Management, 2020-05- 2020-06- 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-06- 2021-01- enlace técnico y IBRD / 87350 Post Consultant Direct 14,100.00 13,981.85 Signed Monitoring and Evaluation 22 07 01 16 22 16 27 16 23 administrativo financiero Selection entre el Programa EMPODERAR y el Ministerio de Desarrollo Rural y Tierras BO-EMPODERAR-175921- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-06- 2020-08- 2020-06- 2020-09- 2020-06- 2021-03- IBRD / 87350 Post Consultant Open 15,668.00 13,567.17 Signed Secretaria de la Unidad de Monitoring and Evaluation 03 24 22 24 12 26 16 26 15 Selection Coordinación Nacional BO-EMPODERAR-175923- Individual CS-INDV / Contratación Project Management, 2020-05- 2020-07- 2020-08- 2020-09- 2021-03- IBRD / 87350 Post Consultant Open 15,668.00 0.00 Canceled Chofer de la Unidad de Monitoring and Evaluation 27 15 05 09 08 Selection Coordinación Nacional BO-EMPODERAR-175886- Individual CS-INDV / Contratación del Project Management, 2020-05- 2020-06- 2020-07- 2020-07- 2020-08- 2020-07- 2020-09- 2020-08- 2021-11- IBRD / 87350 Post Consultant Open 48,410.00 2,829.11 Terminated Coordinador General del Monitoring and Evaluation 27 09 15 27 05 31 09 01 30 Selection Programa EMPODERAR BO-EMPODERAR-178600- CS-CDS / Selección del personal técnico para la Project Management, 2020-06- 2020-06- 2020-06- 2020-06- 2020-08- 2020-06- 2020-12- IBRD / 87350 Post Direct Selection Direct 20,000.00 21,224.62 Signed Unidad de Coordinación Monitoring and Evaluation 09 15 19 19 23 19 31 Nacional y las unidades operativas departamentales del PAR II BO-EMPODERAR-178606- CS-INDV / Contratación Individual Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- Consultor de linea: IBRD / 87350 Post Consultant Open 12,016.00 9,483.63 Terminated Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 Especialista Ambiental de la Selection UCN BO-EMPODERAR-178616- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 8,898.00 7,022.64 Terminated Consultor de linea: Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 Selection Asistente en adquisiciones de la UCN BO-EMPODERAR-178618- CS-INDV / Contratación Individual Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- Consultor de linea: Oficial IBRD / 87350 Post Consultant Open 10,782.00 8,509.59 Terminated Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 de alianzas UOD La Paz Selection (Rurrenabaque) BO-EMPODERAR-178619- CS-INDV / Contratación Individual Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- Consultor por producto: IBRD / 87350 Post Consultant Open 10,782.00 8,509.59 Terminated Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 Oficial de Infraestructura y Selection Riego UOD Oruro BO-EMPODERAR-178620- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 15,376.00 12,135.15 Terminated Consultor de linea: Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 Selection Operador departamental UOD Oruro BO-EMPODERAR-178621- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 10,782.00 8,509.59 Terminated Consultor de linea: Analista Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 Selection Ambiental UOR Chaco BO-EMPODERAR-178622- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 10,782.00 8,497.28 Terminated Consultor de linea: Oficial Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 Selection de alianzas UOR Chaco BO-EMPODERAR-178623- Individual Project Management, 2020-06- 2020-06- 2020-07- 2020-08- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- CS-INDV / Contratación IBRD / 87350 Post Consultant Open 15,376.00 12,407.69 Terminated Monitoring and Evaluation 09 16 28 04 18 07 22 07 31 Operador UOD Selection Cochabamba BO-EMPODERAR-178625- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 10,782.00 8,521.93 Terminated Consultor de linea: Analista Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 Selection ambiental UOD Chuquisaca BO-EMPODERAR-178626- CS-INDV / Contratación Individual Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- Consultor de linea: Oficial IBRD / 87350 Post Consultant Open 10,782.00 8,509.59 Terminated Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 de infraestructura y riego Selection UOD Santa Cruz BO-EMPODERAR-178628- CS-INDV / Contratación Individual Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- Consultor de linea: Analista IBRD / 87350 Post Consultant Open 10,782.00 8,509.59 Terminated Monitoring and Evaluation 09 16 28 31 18 10 22 10 31 en desarrollo Selection organizacional UOD Tarija BO-EMPODERAR-178631- CS-INDV / Contratación de Individual un consultor individual por Project Management, 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2020-07- 2020-09- IBRD / 87350 Post Consultant Direct 4,450.00 4,413.45 Signed producto para apoyar en el Monitoring and Evaluation 09 17 19 13 10 13 14 13 30 Selection registro de actividades aprobadas en el STEP BO-EMPODERAR-178635- CS-INDV / Contratación Individual Project Management, 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-06- 2020-08- 2020-06- 2020-12- Consultor de linea: IBRD / 87350 Post Consultant Direct 5,223.00 5,039.15 Terminated Monitoring and Evaluation 09 16 19 24 10 24 14 24 31 Asistente Administrativa - Selection Secretaria UOD Potosí BO-EMPODERAR-178876- CS-INDV / Contratación de un consultor individual por Individual Project Management, 2020-06- 2020-06- 2020-07- 2020-08- 2021-02- producto para la revisión y IBRD / 87350 Post Consultant Direct 8,985.00 0.00 Canceled Monitoring and Evaluation 10 20 11 15 11 viabilización de planos de Selection alianza previamente observados en la UOD Beni Page 11 BO-EMPODERAR-178982- CS-INDV / Contratación de un consultor individual por Individual Project Management, 2020-06- 2020-06- 2020-06- 2020-07- 2020-08- 2021-02- producto para que preste IBRD / 87350 Post Consultant Direct 11,298.00 0.00 Canceled Monitoring and Evaluation 10 17 20 11 15 11 asesoramiento técnico legal Selection administrativo especializado al Programa EMPODERAR. BO-EMPODERAR-178986- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-06- 2020-07- 2020-06- 2020-07- 2020-06- 2020-07- 2020-08- 2020-08- IBRD / 87350 Post Consultant Direct 2,485.00 2,468.21 Completed Consultor de linea: Analista Monitoring and Evaluation 10 23 16 01 18 01 22 01 06 15 Selection financiero II de la UCN BO-EMPODERAR-178615- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 10,782.00 8,509.59 Terminated Consultor de linea: Analista Monitoring and Evaluation 09 17 28 31 18 10 22 10 31 Selection en comunicación de la UCN. BO-EMPODERAR-178946- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 10,782.00 8,509.59 Terminated Consultor de linea : Monitoring and Evaluation 10 17 29 31 19 10 23 10 31 Selection Analista fifuciario de la UOD Beni BO-EMPODERAR-178943- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 8,898.00 7,022.64 Terminated Consultor de linea: Monitoring and Evaluation 10 17 29 31 19 10 23 10 31 Selection Asistente de sistemas de la UCN BO-EMPODERAR-178617- Individual CS-INDV / Contratación Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 15,376.00 12,407.71 Terminated Consultor de linea: Monitoring and Evaluation 09 17 28 31 18 07 22 07 31 Selection Operador de la UOD La Paz BO-EMPODERAR-178614- CS-INDV / Contratación Individual Project Management, 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- Consultor de linea; IBRD / 87350 Post Consultant Open 12,016.00 9,469.92 Terminated Monitoring and Evaluation 09 17 28 31 18 10 22 10 31 Especialista en capacitación Selection y asistencia técnica de la UCN BO-EMPODERAR-183809- CS-INDV / Contratación Individual Pending 2020-07- 2020-08- 2020-08- 2020-08- 2020-12- Analista Fiduciario para la IBRD / 87350 Institutional Strengthening Post Consultant Open 28,750.00 0.00 Implementation 10 11 17 24 31 Unidad Operativa Selection departamental Pando BO-EMPODERAR-183813- Individual Project Management, Under 2020-07- 2020-08- 2020-08- 2020-08- 2020-12- CS-INDV / Contratación IBRD / 87350 Post Consultant Open 12,815.00 0.00 Monitoring and Evaluation Implementation 10 11 17 24 31 Chofer para la UOD Pando Selection BO-EMPODERAR-183814- CS-INDV / Especialista en Individual Project Management, Pending 2020-07- 2020-08- 2020-08- 2020-08- 2020-12- Desarrollo Organizacional IBRD / 87350 Post Consultant Open 32,050.00 0.00 Monitoring and Evaluation Implementation 10 11 17 24 31 de la Unidad de Selection Coordinación Nacional BO-EMPODERAR-183819- CS-INDV / Auxiliar - Técnico UCN: Consultor de línea responsable de apoyo Individual al equipo técnico y Implementation of Rural Under 2020-07- 2020-11- 2020-08- 2020-08- 2020-08- 2020-12- IBRD / 87350 Post Consultant Open 13,930.00 0.00 administrativo del Proyecto Alliances Implementation 10 25 11 17 24 31 Selection de Alianzas Rurales, en las actividades y tareas críticas que se presentan en la operación del Proyecto BO-EMPODERAR-185156- Individual Project Management, Under 2020-07- 2020-08- 2020-08- 2020-09- 2020-12- CS-INDV / Contratación IBRD / 87350 Post Consultant Open 12,815.00 0.00 Monitoring and Evaluation Implementation 21 22 28 04 31 Chofer para la UOD Selection Chuquisaca BO-EMPODERAR-188561- Individual CS-INDV / Contratación Project Management, 2020-08- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-12- IBRD / 87350 Post Consultant Open 38,450.00 7,648.59 Terminated Operador Unidad Operativa Monitoring and Evaluation 12 24 09 30 12 16 01 31 Selection Departamental Pando BO-EMPODERAR-188562- Individual CS-INDV / Contratación Project Management, Under 2020-08- 2020-08- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020-12- IBRD / 87350 Post Consultant Open 38,450.00 0.00 Operador Unidad Operativa Monitoring and Evaluation Implementation 12 24 09 30 12 01 16 31 Selection Departamental Beni BO-EMPODERAR-189219- Individual CS-INDV / Contratación Project Management, Under 2020-08- 2020-08- 2020-09- 2020-09- 2020-09- 2020-12- IBRD / 87350 Post Consultant Open 38,450.00 0.00 Operador Unidad Operativa Monitoring and Evaluation Implementation 17 24 14 17 21 30 Selection Departamental Chuquisaca BO-EMPODERAR-190584- CS-INDV / CHOFER - Individual Project Management, Under 2020-08- 2020-08- 2020-09- 2020-10- 2020-10- 2021-02- ASISTENTE PARA LA IBRD / 87350 Post Consultant Open 27,370.00 0.00 Monitoring and Evaluation Implementation 26 26 27 03 10 05 UNIDAD OPERATIVA Selection DEPARTAMENTAL DE ORURO PROYECTO PAR II BO-EMPODERAR-192319- CS-INDV / OPERADOR Individual DEPARTAMENTAL PARA LA Project Management, Under 2020-09- 2020-09- 2020-10- 2020-10- 2020-10- 2021-01- IBRD / 87350 Post Consultant Open 38,500.00 0.00 UNIDAD OPERATIVA Monitoring and Evaluation Implementation 07 14 05 08 12 26 Selection DEPARTAMENTAL DE TARIJA PROYECTO PAR II BO-EMPODERAR-196705- CS-INDV / Consultor por Individual Project Management, Under 2020-09- 2020-09- 2020-10- 2020-10- 2020-12- 2021-02- producto para apoyo IBRD / 87350 Post Consultant Direct 4,010.00 0.00 Monitoring and Evaluation Implementation 28 30 08 29 03 01 transversal entre el Selection proyecto PAR II y el FPS BO-EMPODERAR-198523- CS-CDS / AJUSTES Y Project Management, Under 2020-10- 2020-10- 2020-10- 2020-12- 2021-06- OPTIMIZACIONES DEL IBRD / 87350 Post Direct Selection Direct 20,050.00 0.00 Monitoring and Evaluation Implementation 07 09 17 21 19 SISTEMA DE INFORMACIÓN GERENCIAL GEOREFERENCIADO DEL PAR II BO-EMPODERAR-205609- Individual CS-INDV / Contratación del Project Management, 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2020-11- 2021-01- 2020-11- 2021-07- IBRD / 87350 Post Consultant Direct 37,020.00 33,949.31 Signed Coordinador General del Monitoring and Evaluation 19 20 29 16 20 16 24 16 23 Selection Programa EMPODERAR BO-EMPODERAR-205573- CS-INDV / Contratación Individual Especialista en Capacitación Project Management, Under 2020-11- 2020-11- 2020-11- 2020-12- 2021-01- 2021-07- IBRD / 87350 Post Consultant Direct 26,034.00 0.00 y Asistencia Técnica de la Monitoring and Evaluation Implementation 19 25 29 20 24 23 Selection Unidad de Coordinación Nacional BO-EMPODERAR-205606- Individual CS-INDV / Contratación Project Management, Under 2020-11- 2020-11- 2020-11- 2020-12- 2021-01- 2021-07- IBRD / 87350 Post Consultant Direct 24,626.00 0.00 Analista en Comunicación Monitoring and Evaluation Implementation 19 25 29 20 24 23 Selection de la Unidad de Coordinación Nacional BO-EMPODERAR-206573- Individual CS-INDV / Contratación Project Management, Under 2020-11- 2020-11- 2020-12- 2020-12- 2021-01- 2021-07- IBRD / 87350 Post Consultant Direct 30,750.00 0.00 Operador Unidad Operativa Monitoring and Evaluation Implementation 25 30 05 26 30 29 Selection Departamental La Paz BO-EMPODERAR-207481- Individual CS-INDV / Contratación Project Management, Under 2020-12- 2020-12- 2020-12- 2021-01- 2021-02- 2021-08- IBRD / 87350 Post Consultant Direct 30,750.00 0.00 Operador de la Unidad Monitoring and Evaluation Implementation 01 01 11 01 05 04 Selection Operativa Departamental Pando BO-EMPODERAR-207846- Individual CS-INDV / Contratación Project Management, Under 2020-12- 2020-12- 2020-12- 2021-01- 2021-02- 2021-08- IBRD / 87350 Post Consultant Direct 17,795.00 0.00 Asistente de Sistemas de la Monitoring and Evaluation Implementation 02 03 12 02 06 05 Selection Unidad de Coordinación Nacional BO-EMPODERAR-208447- CS-INDV / Contratación Individual Project Management, Under 2020-12- 2020-12- 2020-12- 2021-01- 2021-02- 2021-08- Analista en Desarrollo IBRD / 87350 Post Consultant Direct 21,564.00 0.00 Monitoring and Evaluation Implementation 07 08 17 07 11 10 Organizacional para la Selection Unidad Operativa Departamental La Paz BO-EMPODERAR-208451- CS-INDV / Contratación Individual Project Management, Under 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- Especialista en IBRD / 87350 Post Consultant Open 22,029.00 0.00 Monitoring and Evaluation Implementation 07 25 15 22 30 Infraestructura y Riego de Selection la Unidad de Coordinación Nacional BO-EMPODERAR-208455- Individual CS-INDV / Contratación Project Management, Under 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- IBRD / 87350 Post Consultant Open 28,188.00 0.00 Operador de la Unidad Monitoring and Evaluation Implementation 07 25 15 22 30 Selection Operativa Departamental Cochabamba BO-EMPODERAR-208459- CS-INDV / Cointratación Individual Project Management, 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- Especialista Ambiental de la IBRD / 87350 Post Consultant Open 22,029.00 0.00 Canceled Monitoring and Evaluation 07 25 15 22 30 Unidad de Coordinación Selection Nacional BO-EMPODERAR-208460- Individual CS-INDV / Contratación Project Management, Under 2020-12- 2020-12- 2021-01- 2021-01- 2021-02- 2021-01- 2021-03- 2021-06- IBRD / 87350 Post Consultant Open 16,313.00 0.00 Asistente en Adquisiciones Monitoring and Evaluation Implementation 07 08 25 04 15 04 22 30 Selection de la Unidad de Coordinación Nacional BO-EMPODERAR-208461- CS-INDV / Contratación Individual Project Management, Under 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- Oficial de Alianzas de la IBRD / 87350 Post Consultant Open 19,367.00 0.00 Monitoring and Evaluation Implementation 07 25 15 22 30 Unidad Operativa Selection Departamental La Paz (Rurrenabaque) BO-EMPODERAR-208464- CS-INDV / Contratación Individual Project Management, Under 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- Oficial de Infraestructura y IBRD / 87350 Post Consultant Open 19,767.00 0.00 Monitoring and Evaluation Implementation 07 08 25 15 22 30 Riego de la Unidad Selection Operativa Departamental Oruro BO-EMPODERAR-208466- Individual CS-INDV / Contratación Project Management, Under 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- IBRD / 87350 Post Consultant Open 19,767.00 0.00 Oficial de Alianzas Unidad Monitoring and Evaluation Implementation 07 08 25 15 22 30 Selection Operativa Regional Chaco BO-EMPODERAR-208467- CS-INDV / Contratación Individual Project Management, Under 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- Analista Ambiental de la IBRD / 87350 Post Consultant Open 19,767.00 0.00 Monitoring and Evaluation Implementation 07 25 15 22 30 Unidad Operativa Selection Departamental Chuquisaca BO-EMPODERAR-208468- CS-INDV / Contratación Individual Project Management, Under 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- Oficial de Infraestructura y IBRD / 87350 Post Consultant Open 19,767.00 0.00 Monitoring and Evaluation Implementation 07 08 25 15 22 30 Riego de la Unidad Selection Operativa Departamental Santa Cruz BO-EMPODERAR-208472- CS-INDV / Contratación Individual Project Management, Under 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- Analista en Desarrollo IBRD / 87350 Post Consultant Open 19,767.00 0.00 Monitoring and Evaluation Implementation 07 08 25 15 22 30 Organizacional de la Unidad Selection Operativa Departamental Tarija BO-EMPODERAR-208473- Individual CS-INDV / Contratación Project Management, 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- IBRD / 87350 Post Consultant Open 19,767.00 0.00 Canceled Analista Fiduciario de la Monitoring and Evaluation 07 08 25 15 22 30 Selection Unidad Operativa Departamental Beni BO-EMPODERAR-208716- Individual CS-INDV / Contratación Project Management, Under 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-07- IBRD / 87350 Post Consultant Open 28,188.00 0.00 Operador de la Unidad Monitoring and Evaluation Implementation 08 11 26 16 23 01 Selection Operativa Departamental Tarija BO-EMPODERAR-209764- CS-INDV / CONTRATACION Individual Project Management, Under 2020-12- 2020-12- 2020-12- 2021-01- 2021-02- 2021-08- DE ESPECIALISTA IBRD / 87350 Post Consultant Direct 22,029.00 0.00 Monitoring and Evaluation Implementation 14 15 24 14 18 17 AMBIENTAL DE LA UNIDAD Selection DE COORDINACION NACIONAL BO-EMPODERAR-211464- Individual CS-INDV / Contratación Project Management, Pending 2020-12- 2021-01- 2021-01- 2021-02- 2021-08- IBRD / 87350 Post Consultant Direct 30,751.00 0.00 Operador de la Unidad Monitoring and Evaluation Implementation 23 02 23 27 26 Selection Operativa Departamental Beni BO-EMPODERAR-211465- Individual CS-INDV / Contratación Project Management, Pending 2020-12- 2021-01- 2021-01- 2021-02- 2021-08- IBRD / 87350 Post Consultant Direct 21,564.00 0.00 Analista Fiduciario de la Monitoring and Evaluation Implementation 23 02 23 27 26 Selection Unidad Operativa Departamental Beni BO-EMPODERAR-211472- Individual CS-INDV / Contratación Project Management, Under 2020-12- 2020-12- 2021-01- 2021-01- 2021-02- 2021-08- IBRD / 87350 Post Consultant Direct 19,876.00 0.00 Analista Financiero II de la Monitoring and Evaluation Implementation 23 24 02 23 27 26 Selection Unidad de Coordinación Nacional BO-EMPODERAR-211479- CS-INDV / Contratación Individual Project Management, Under 2020-12- 2020-12- 2021-01- 2021-01- 2021-02- 2021-08- Asistente Administrativo IBRD / 87350 Post Consultant Direct 10,445.00 0.00 Monitoring and Evaluation Implementation 23 23 02 23 27 26 Secretaria de la Unidad Selection Operativa Departamental Cochabamba BO-EMPODERAR-212366- Individual CS-INDV / CONTRATACION Project Management, Under 2021-01- 2021-01- 2021-01- 2021-01- 2021-03- 2021-11- IBRD / 87350 Post Consultant Direct 17,150.00 0.00 DE ASITENTE EN Monitoring and Evaluation Implementation 05 05 10 31 07 30 Selection ADQUISICIONES Y CONTRATACIONES BO-EMPODERAR-212521- CS-INDV / ESPECIALISTA EN Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- NEGOCIOS RURALES PARA IBRD / 87350 Post Consultant Open 20,030.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 LA UNIDAD DE Selection COORDINACION NACIONAL BO-EMPODERAR-212522- CS-INDV / ESPECIALISTA Individual DESARROLLO Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 20,030.00 0.00 ORGANIZACIONAL PARA LA Monitoring and Evaluation Implementation 06 24 17 21 30 Selection UNIDAD DE COORDINACION NACIONAL Page 12 BO-EMPODERAR-212523- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / OFICIAL DE IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 ALIANZA PARA LA UOD BENI Selection BO-EMPODERAR-212524- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 AMBIENTAL PARA LA UOD Selection BENI BO-EMPODERAR-212525- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 FIDUCIARIO PARA LA UOD Selection BENI BO-EMPODERAR-212527- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 AMBIENTAL PARA LA UOD Selection COCHABAMBA BO-EMPODERAR-212530- Individual Project Management, Under 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / OPERADOR PARA IBRD / 87350 Post Consultant Open 30,750.00 0.00 Monitoring and Evaluation Implementation 06 08 24 17 21 30 LA UOD CHUQUISACA Selection BO-EMPODERAR-212531- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / OFICIAL DE IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 ALIANZAS PARA LA UOD Selection CHUQUISACA BO-EMPODERAR-212532- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / OFICIAL DE IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 ALIANZAS PARA LA UOD LA Selection PAZ BO-EMPODERAR-212533- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / OFICIAL DE IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 ALIANZAS PARA LA UOD LA Selection PAZ BO-EMPODERAR-212534- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 AMBIENTAL PARA LA UOD Selection LA PAZ BO-EMPODERAR-212537- Individual CS-INDV / ANALISTA Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 17,970.00 0.00 FIDUCUARIO PARA LA UOD Monitoring and Evaluation Implementation 06 24 17 21 30 Selection LA LAZ (RURRENABAQUE) BO-EMPODERAR-212539- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 AMBIENTAL PARA LA UDO Selection ORURO BO-EMPODERAR-212541- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 FIDUCIARIO PARA LA UOD Selection ORURO BO-EMPODERAR-212542- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 AMBIENTAL PARA LA UOD Selection PANDO BO-EMPODERAR-212543- Individual CS-INDV / OFICIAL DE Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 17,970.00 0.00 INFRAESTRUCTURA Y RIEGO Monitoring and Evaluation Implementation 06 24 17 21 30 Selection PARA UOD PANDO BO-EMPODERAR-212544- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 FIDUCIARIO PARA LA UOD Selection PANDO BO-EMPODERAR-212545- Individual CS-INDV / OFICIAL DE Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 17,970.00 0.00 INFRAESTRUCTURA Y RIEGO Monitoring and Evaluation Implementation 06 24 17 21 30 Selection PARA LA UOD POTOSI BO-EMPODERAR-212547- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 FIDUCIARIO PARA LA UOD Selection POTOSI BO-EMPODERAR-212548- Individual CS-INDV / OFICIAL DE Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 17,970.00 0.00 ALIANZAS PARA LA UOD Monitoring and Evaluation Implementation 06 24 17 21 30 Selection POTOSI (CAMARGO) BO-EMPODERAR-212549- Individual CS-INDV / ANALISTA Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 17,970.00 0.00 FIDUCUARIO PARA LA UOD Monitoring and Evaluation Implementation 06 24 17 21 30 Selection POTOSI (CAMARGO) BO-EMPODERAR-212550- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 AMBIENTAL PARA LA UOD Selection SANTA CRUZ BO-EMPODERAR-212551- Individual CS-INDV / OFICIAL DE Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 17,970.00 0.00 INFRAESTRUCTURA Y RIEGO Monitoring and Evaluation Implementation 06 24 17 21 30 Selection PARA LA UOD SANTA CRUZ BO-EMPODERAR-212552- Individual CS-INDV / OFICIAL DE Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 17,970.00 0.00 ALIANZAS PARA LA UOD Monitoring and Evaluation Implementation 06 24 17 21 30 Selection SANTA CRUZ (CHUQUITANIA) BO-EMPODERAR-212553- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Open 17,970.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 FIDUCIARIO PARA LA UOD Selection TARIJA BO-EMPODERAR-212566- Individual Project Management, Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / AUXILIAR IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 TÉCNICO PARA LA UCN Selection BO-EMPODERAR-212570- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 LA UOD BENI Selection BO-EMPODERAR-212571- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 LA UOD BENI Selection BO-EMPODERAR-212572- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / SECRETARIA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 UOD BENI Selection BO-EMPODERAR-212573- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / CHOFER UOD IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 COCHABAMBA Selection BO-EMPODERAR-212574- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 LA UOD LA PAZ Selection BO-EMPODERAR-212575- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 LA UOD LA PAZ Selection (RURRENABAQUE) BO-EMPODERAR-212577- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / SECRETARIA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 PARA LA UOD LA PAZ Selection (RURRENABAQUE) BO-EMPODERAR-212578- Individual Project Management, Under 2021-01- 2021-02- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / SECRETARIA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 01 24 17 21 30 PARA LA UOD LA PAZ Selection BO-EMPODERAR-212579- Individual Project Management, Under 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / SECRETARIA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 06 24 17 21 30 PARA LA UOD ORURO Selection BO-EMPODERAR-212580- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 LA UOD POTOSI Selection BO-EMPODERAR-212581- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / SECRETARIA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 PARA LA UOD POTOSI Selection BO-EMPODERAR-212582- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / SECRETARIA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 CAMARGO UOD POTOSI Selection (CAMARGO) BO-EMPODERAR-212583- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 8,010.00 0.00 Monitoring and Evaluation Implementation 06 24 17 21 30 LA UOD TARIJA Selection BO-EMPODERAR-212751- Individual CS-INDV / ANALLISTA Project Management, Under 2021-01- 2021-02- 2021-01- 2021-02- 2021-03- 2021-12- IBRD / 87350 Post Consultant Direct 17,970.00 0.00 FIDUCIACIO UOD Monitoring and Evaluation Implementation 07 01 12 02 09 02 Selection COCHABAMBA BO-EMPODERAR-212754- Individual Project Management, Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-12- CS-INDV / Oficial de IBRD / 87350 Post Consultant Direct 17,970.00 0.00 Monitoring and Evaluation Implementation 07 12 02 09 02 Alianzas UOD Oruro Selection BO-EMPODERAR-212757- Individual Project Management, Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-12- CS-INDV / Analista en IBRD / 87350 Post Consultant Direct 17,970.00 0.00 Monitoring and Evaluation Implementation 07 12 02 09 02 Desarrollo Institucional Selection UOD Tarija BO-EMPODERAR-212761- Individual CS-INDV / Oficial de Project Management, Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-12- IBRD / 87350 Post Consultant Direct 17,970.00 0.00 Infraestructura y Riego UOD Monitoring and Evaluation Implementation 07 07 12 02 09 02 Selection La Paz BO-EMPODERAR-212947- Individual Project Management, Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-11- CS-INDV / ANALISTA IBRD / 87350 Post Consultant Direct 21,570.00 0.00 Monitoring and Evaluation Implementation 08 08 13 03 10 30 FIDUCIARIO UOD LA PAZ Selection BO-EMPODERAR-212948- Individual Project Management, Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-11- CS-INDV / ASISTENTE IBRD / 87350 Post Consultant Direct 8,810.00 0.00 Monitoring and Evaluation Implementation 08 08 13 03 10 30 ADMINISTRATIVO Selection SECRETARIA BO-EMPODERAR-212949- Individual CS-INDV / SECRETARIA Project Management, Under 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 8,810.00 0.00 PARA LA UOD SANTA CRUZ Monitoring and Evaluation Implementation 08 08 26 19 23 30 Selection (CHIQUITANIA) BO-EMPODERAR-212950- Individual Project Management, Under 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 8,810.00 0.00 Monitoring and Evaluation Implementation 08 26 19 23 30 LA UOD SANTA CRUZ Selection (CHIQUITANIA) BO-EMPODERAR-212528- Individual CS-INDV / OFICIAL DE Project Management, 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- IBRD / 87350 Post Consultant Open 17,970.00 0.00 Canceled INFRAESTRUCTURA Y RIEGO Monitoring and Evaluation 06 24 17 21 30 Selection PARA LA UOD COCHABAMBA BO-EMPODERAR-212098- Individual CS-INDV / Contratación Project Management, 2020-12- 2021-01- 2021-01- 2021-01- 2021-03- 2021-09- IBRD / 87350 Post Consultant Direct 30,751.00 0.00 Canceled Operador de la Unidad Monitoring and Evaluation 31 05 10 31 07 03 Selection Operativa Departamental Potosí BO-EMPODERAR-208454- Individual CS-INDV / Contratación Project Management, 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- IBRD / 87350 Post Consultant Open 28,188.00 0.00 Canceled Operador de la Unidad Monitoring and Evaluation 07 08 25 15 22 30 Selection Operativa Departamental Oruro BO-EMPODERAR-213546- Individual Project Management, Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-11- CS-INDV / OPERADOR IBRD / 87350 Post Consultant Direct 30,750.00 0.00 Monitoring and Evaluation Implementation 12 17 07 14 30 DEPARTAMENTAL DE Selection ORURO BO-EMPODERAR-213547- Individual CS-INDV / OFICIAL DE Project Management, Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-11- IBRD / 87350 Post Consultant Direct 21,563.00 0.00 ALIANZAS PARA LA UOD Monitoring and Evaluation Implementation 12 17 07 14 30 Selection POTOSI - CAMARGO BO-EMPODERAR-213549- Individual CS-INDV / OFICIAL DE Project Management, Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-11- IBRD / 87350 Post Consultant Direct 21,570.00 0.00 INFRAESTRUCTURA Y RIEGO Monitoring and Evaluation Implementation 12 17 07 14 30 Selection UOD COCHABAMBA BO-EMPODERAR-214297- Individual Project Management, Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-11- CS-INDV / ASISTENTE DE IBRD / 87350 Post Consultant Direct 4,450.00 0.00 Monitoring and Evaluation Implementation 16 28 21 11 18 30 CONTABILIDAD UCN Selection BO-EMPODERAR-217868- Individual CS-INDV / Operador de la Project Management, Under 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- IBRD / 87350 Post Consultant Open 30,750.00 0.00 Unidad Operativa Monitoring and Evaluation Implementation 04 25 15 20 16 Selection Departamental Potosí BO-EMPODERAR-217869- Individual CS-INDV / Operador Project Management, Under 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- IBRD / 87350 Post Consultant Open 30,750.00 0.00 Unidad Operativa Monitoring and Evaluation Implementation 04 25 15 20 16 Selection Departamental Oruro BO-EMPODERAR-218878- CS-INDV / Contratación de 10 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- Operativa Departamental IBRD / 87350 Post Consultant Open 78,580.00 0.00 Alliances Implementation 10 31 21 26 22 Tarija (Responsables de la Selection ejecución de planos de alianza, de la implementación física, financiera y técnica y de planos de alianza) Page 13 BO-EMPODERAR-218885- CS-INDV / Contratación de 10 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- Operativa Departamental IBRD / 87350 Post Consultant Open 78,580.00 0.00 Alliances Implementation 10 31 21 26 22 Pando (Responsables de la Selection ejecución de planos de alianza, de la implementación física, financiera y técnica y de planos de alianza) BO-EMPODERAR-218892- CS-INDV / Contratación de 20 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- Operativa Departamental La IBRD / 87350 Post Consultant Open 157,160.00 0.00 Alliances Implementation 10 31 21 26 22 Paz (Responsables de la Selection ejecución de planos de alianza, de la implementación física, financiera y técnica y de planos de alianza) BO-EMPODERAR-218894- CS-INDV / Contratación de 10 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Under 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- Operativa Departamental IBRD / 87350 Post Consultant Open 157,160.00 0.00 Alliances Implementation 10 31 21 26 22 Oruro (Responsables de la Selection ejecución de planos de alianza, de la implementación física, financiera y técnica y de planos de alianza) BO-EMPODERAR-220600- CS-INDV / Asistente Individual Project Management, Under 2021-02- 2021-02- 2021-03- 2021-03- 2021-03- 2021-03- 2021-03- 2021-09- Administrativo para la IBRD / 87350 Post Consultant Direct 5,740.00 0.00 Monitoring and Evaluation Implementation 19 23 01 15 10 10 15 03 Unidad Operativa Selection Departamental de La Paz - PAR II BO-EMPODERAR-220611- CS-INDV / Contratacion de Individual Project Management, Under 2021-02- 2021-02- 2021-03- 2021-03- 2021-03- 2021-09- 7 pasantes administrativos IBRD / 87350 Post Consultant Direct 12,244.00 0.00 Monitoring and Evaluation Implementation 19 23 01 04 08 04 para la Unidad de Selection Cordinacion Nacional - PAR II BO-EMPODERAR-220677- CS-INDV / Analista Individual Project Management, Under 2021-02- 2021-02- 2021-02- 2021-03- 2021-04- 2021-11- Desarrollo Organizacional IBRD / 87350 Post Consultant Direct 16,840.00 0.00 Monitoring and Evaluation Implementation 19 22 24 17 21 30 para la Unidad Operativa Selection Departamental de Oruro - PAR II BO-EMPODERAR-221660- CS-CDS / Auditoria Project Management, Under 2021-02- 2021-02- 2021-03- 2021-05- 2021-11- Financiera del periodo IBRD / 87350 Post Direct Selection Direct 21,865.00 0.00 Monitoring and Evaluation Implementation 24 25 06 10 30 comprendido entre el 1 de enero al 31 de diciembre de 2020 BO-EMPODERAR-223629- CS-INDV / Contratación de 10 consultores por producto: Acompañantes de alianza en la Unidad Individual Implementation of Rural Pending 2021-03- 2021-04- 2021-05- 2021-06- 2021-12- Operativa Departamental IBRD / 87350 Post Consultant Open 157,160.00 0.00 Alliances Implementation 08 26 17 21 18 Chuquisaca (Responsables Selection de la ejecución de planos de alianza, de la implementación física, financiera y técnica y de planos de alianza) BO-EMPODERAR-225633- CS-INDV / CONTRATACION Individual Project Management, Under 2021-03- 2021-03- 2021-05- 2021-05- 2021-07- 2021-11- DE ASISTENTE IBRD / 87350 Post Consultant Open 6,406.00 0.00 Monitoring and Evaluation Implementation 19 22 07 28 02 30 ADMINISTRATIVO - Selection SECRETARIA PARA LA UOD SANTA CRUZ PAR II BO-EMPODERAR-226307- CS-INDV / CONTRATACION Individual Project Management, Under 2021-03- 2021-03- 2021-03- 2021-04- 2021-05- 2021-11- JEFE FINANCIERO PARA LA IBRD / 87350 Post Consultant Direct 20,500.00 0.00 Monitoring and Evaluation Implementation 24 29 29 19 24 30 UNIDAD DE COORDINACION Selection NACIONAL - PAR II BO-EMPODERAR-226308- CS-INDV / CONTRATACION Individual DEL ESPECIALISTA EN Project Management, Under 2021-03- 2021-03- 2021-03- 2021-04- 2021-05- 2021-11- IBRD / 87350 Post Consultant Direct 16,025.00 0.00 ADQUISICIONES PARA LA Monitoring and Evaluation Implementation 24 29 29 19 24 30 Selection UNIDAD DE COORDINACION NACIONAL DEL PAR II BO-EMPODERAR-228004- Individual CS-INDV / ANALISTA Project Management, Under 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- 2021-11- IBRD / 87350 Post Consultant Direct 14,375.00 0.00 FIDUCIARIO PARA LA Monitoring and Evaluation Implementation 05 05 10 01 05 30 Selection UNIDAD OPERATIVA REGIONAL CHACO - PAR II BO-EMPODERAR-228643- CS-INDV / Contratación de Individual 10 consultores por Under 2021-04- 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IBRD / 87350 Institutional Strengthening Post Consultant Open 43,000.00 0.00 producto: Facilitadores, Implementation 09 16 28 18 23 30 Selection para la formulación de planes de alianza para el PAR II BO-EMPODERAR-229667- CS-INDV / Contratacion del Individual Analista Fiduciario para la Project Management, Under 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- 2021-12- IBRD / 87350 Post Consultant Direct 13,297.00 0.00 Unidad Operativa Monitoring and Evaluation Implementation 16 21 21 12 16 11 Selection Departamental de Pando - PAR II BO-EMPODERAR-218871- CS-INDV / CONTRATACIÓN DE UN CONSULTOR Individual Project Management, 2021-02- 2021-02- 2021-03- 2021-04- 2021-06- INDIVIDUAL POR IBRD / 87350 Post Consultant Direct 4,450.00 0.00 Canceled Monitoring and Evaluation 10 20 13 17 03 PRODUCTO PARA Selection ACTUALIZAR EL REGISTRO DE ACTIVIDADES APROBADAS EN EL STEP BO-EMPODERAR-230901- CS-CDS / AUDITORIA ESPECIAL DE ADQUISICIONES Y Project Management, Under 2021-04- 2021-04- 2021-05- 2021-07- 2021-11- CONTRATACIONES IBRD / 87350 Post Direct Selection Direct 35,000.00 0.00 Monitoring and Evaluation Implementation 21 29 01 05 30 CORRESPONDIENTE AL PERIODO COMPRENDIDO ENTRE EL 1 DE ENERO DE 2020 Y EL 31 DE DICIEMBRE DE 2020. BO-EMPODERAR-230893- CS-INDV / CONTRATACIÓN DE UN CONSULTOR Individual Project Management, Under 2021-04- 2021-04- 2021-05- 2021-05- 2021-05- 2021-11- INDIVIDUAL POR IBRD / 87350 Post Consultant Direct 9,352.00 0.00 Monitoring and Evaluation Implementation 21 26 01 03 05 01 PRODUCTO PARA Selection ACTUALIZAR EL REGISTRO DE ACTIVIDADES APROBADAS EN EL STEP BO-EMPODERAR-231106- CS-INDV / Contratacion de Individual Project Management, Under 2021-04- 2021-04- 2021-05- 2021-05- 2021-05- 2021-11- Especialista en Negocios IBRD / 87350 Post Consultant Direct 14,352.00 0.00 Monitoring and Evaluation Implementation 22 26 02 04 06 30 para la Unidad de Selection Coordinacion Nacional BO-EMPODERAR-230900- Individual Project Management, Under 2021-04- 2021-04- 2021-05- 2021-05- 2021-06- 2021-11- CS-INDV / Contratación IBRD / 87350 Post Consultant Open 5,606.00 0.00 Monitoring and Evaluation Implementation 21 26 23 29 05 30 Chofer para la UOD Selection Chuquisaca BO-EMPODERAR-231277- CS-INDV / CONTRATACION Individual Project Management, Under 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2021-11- DE ANALISTA AMBIENTAL IBRD / 87350 Post Consultant Open 12,578.00 0.00 Monitoring and Evaluation Implementation 23 26 11 02 06 30 PARA LA UNIDAD REGIONAL Selection CAMIRI (CHACO) PAR II BO-EMPODERAR-231278- CS-INDV / OFICIAL DE Individual Project Management, Under 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2021-11- INFRAESTRUCTURA Y RIEGO IBRD / 87350 Post Consultant Open 12,578.00 0.00 Monitoring and Evaluation Implementation 23 26 11 02 06 30 PARA LA UOD Selection COCHABAMBA PAR II BO-EMPODERAR-231279- CS-INDV / CONTRATACION Individual Project Management, Under 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2021-11- DE OFICIAL DE ALIANZA IBRD / 87350 Post Consultant Open 12,578.00 0.00 Monitoring and Evaluation Implementation 23 26 11 02 06 30 PAR LA UOD PANDO Selection (RIBERALTA) PAR II BO-EMPODERAR-231280- CS-INDV / CONTRATACION Individual Project Management, Under 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2021-11- DE ANALISTA EN IBRD / 87350 Post Consultant Open 12,578.00 0.00 Monitoring and Evaluation Implementation 23 26 11 02 06 30 DESARROLLO Selection ORGANIZACIONAL PARA LA UOD ORURO PAR II BO-EMPODERAR-234424- CS-INDV / ASISTENTE EN Individual Project Management, Under 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- 2021-11- COMUNICACION PARA LA IBRD / 87350 Post Consultant Open 3,380.00 0.00 Monitoring and Evaluation Implementation 12 01 30 21 25 30 UNIDAD DE COORDINACION Selection NACIONAL - PAR II BO-EMPODERAR-236694- Individual CS-INDV / AUXILIAR DE Project Management, Under 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2021-11- IBRD / 87350 Post Consultant Open 3,961.00 0.00 OFICINA PARA LA UNIDAD Monitoring and Evaluation Implementation 26 01 14 04 08 30 Selection DE COORDINACION NACIONAL BO-EMPODERAR-237627- CS-INDV / ASISTENTE Individual Project Management, Under 2021-06- 2021-06- 2021-07- 2021-08- 2021-09- 2021-11- ADMINISTRATIVO IBRD / 87350 Post Consultant Open 4,805.00 0.00 Monitoring and Evaluation Implementation 01 01 20 10 14 30 SECRETARIA PARA LA UOD Selection PANDO - RIBERALTA BO-EMPODERAR-237629- Individual Project Management, Under 2021-06- 2021-06- 2021-07- 2021-08- 2021-09- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 4,805.00 0.00 Monitoring and Evaluation Implementation 01 01 20 10 14 30 UOD PANDO - RIBERALTA Selection BO-EMPODERAR-238330- Individual Project Management, Under 2021-06- 2021-06- 2021-07- 2021-08- 2021-09- 2021-11- CS-INDV / CHOFER PARA IBRD / 87350 Post Consultant Open 4,805.00 0.00 Monitoring and Evaluation Implementation 04 04 23 13 17 30 LA UOD SANTA CRUZ Selection BO-EMPODERAR-240857- CS-INDV / ASISTENTE EN Individual PLANIFICACIÓN Y Project Management, Under 2021-06- 2021-06- 2021-08- 2021-08- 2021-10- 2021-11- IBRD / 87350 Post Consultant Open 7,793.00 0.00 PROYECTOS PARA LA Monitoring and Evaluation Implementation 22 23 10 31 05 30 Selection UNIDAD DE COORDINACION NACIONAL - PAR II Page 14 PROCUREMENT PLAN Project information: The Ulaanbaatar Heating Sector Improvement Project (P170676) Project Implementation agency: UBHSIP Project Implementation Unit Date of the Procurement Plan: Feb 18, 2021 Period covered by this Procurement Plan: Jan 2021 – June 2022 1. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking of Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. 2. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. 3. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 3.1 National Open Competitive Procurement When the Borrower uses its own national open competitive procurement arrangements as set forth in Chapter Two of the Public Procurement Law of Mongolia enacted on December 1, 2005, as amended several times with the latest amendment on March 22, 2019, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Participation in Bidding and Preferences (i) Government-owned enterprises in Mongolia shall be eligible to participate in bidding only if they can establish that they are legally and financially autonomous, operate under commercial law, and are not a dependent of the agency contracting them. (ii) A bidder declared ineligible by the World Bank, based on a determination by the World Bank that the bidder has engaged 1 in corrupt, fraudulent, collusive, coercive or obstructive practices in competing for or in executing a World Bank- financed contract, shall be ineligible to participate and be awarded a World Bank-financed contract during the period determined by the World Bank. (iii) A firm which has been engaged by the Borrower to provide consulting services for the preparation or implementation of a project, and any of its affiliates, shall be disqualified from subsequently providing goods or works resulting from or directly related to the firm’s consulting services for such preparation or implementation. This provision does not apply to the various firms which together are performing the contractor’s obligations under a turnkey or design and build contract. (iv) Interested foreign bidders from eligible countries shall be allowed to participate without being required to associate or form joint ventures with local bidders. Foreign bidders shall be eligible to participate in bidding under the same conditions as local bidders. Mongolian bidders and goods of Mongolian origin shall be given no preference over foreign bidders, either in the bidding process or in the evaluation of bids. (v) Prior registration shall not be a requirement for any bidder to participate in bidding. (b) Request for Bids / Request for Proposals Documents (i) The request for bids/request for proposals documents shall be acceptable to the World Bank and include the WB’s provisions for fraud and corruption. (ii) In the case of contracts of more than eighteen (18) months’ duration, the procurement documents and the contract shall provide for price adjustment, based on a formula acceptable to the World Bank, which shall be disclosed to the bidders in the procurement documents. (iii) Unless agreed and established in the procurement plan, there shall be no post-bidding negotiations. No bidder shall be required, as a condition for the award of contract, to change his bid price or otherwise materially alter his bid after it has been submitted. (c) Assessment of Bidder’s Qualification Qualification criteria shall be clearly specified in the bidding documents, and only criteria so specified, shall be used to determine whether a bidder is qualified. The evaluation of the bidder’s qualifications shall be conducted separately from the technical and commercial evaluation of the bid. When post 2 qualification is applied, the assessment of bidder’s qualifications shall be carried out only after the preliminary and detailed evaluation of bids has been completed by the Recipient and, in doing so, the qualifications of the bidder who has submitted the lowest evaluated substantially responsive bid or most advantageous bid shall be assessed first. The evaluation of a bidder’s qualifications shall only take into account the bidder’s capacity and resources to perform the contract, specifically its experience and past performance on similar contracts, capabilities with respect to personnel, equipment and construction or manufacturing facilities and financial capacity. In carrying out the bid evaluation including the post-qualification assessment, the Recipient shall exercise reasonable judgment in requesting clarifications in writing from Bidders in accordance with the provisions established in the procurement documents. No bidders shall be disqualified on the ground that the bidder has tax debt. 3.2 Other National Procurement Arrangements When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. The request for bids / request for proposals / request for quotations documents should be acceptable to the Bank and jointly with the signed contract shall include the clauses related to World Bank’s Policy in regard to corrupt and fraudulent practices. The request for bids / request for proposals / request for quotations documents and the signed contract shall also include the clauses allowing the World Bank to inspect the site and/or all accounts and records relating to the performance of the contract and the submission of the bid or proposal, and to have such accounts and records audited. The standard text is attached hereafter. 4. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. 5. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable. 6. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): Not applicable. 7. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not applicable. 8. Other Relevant Procurement Information: Not applicable. 9. Standard Text for Fraud & Corruption and Inspection & Audit Fraud and The Bank requires compliance with the Bank’s Anti- Corruption Guidelines and its prevailing sanctions 3 Corruption policies and procedures as set forth in the WBG’s Sanctions Framework, as set forth in Appendix to the GC. The Employer / Purchaser / Client requires the Contractor / Supplier / the Consultant to disclose any commissions or fees that may have been paid or are to be paid to agents or any other party with respect to the bidding /selection process or execution of the Contract. The information disclosed must include at least the name and address of the agent or other party, the amount and currency, and the purpose of the commission, gratuity or fee. Failure to disclose such commissions, gratuities or fees may result in termination of the Contract and/or sanctions by the Bank. Inspections The Contractor / Supplier / Consultant shall keep and and Audit shall make all reasonable efforts to cause its by the Subcontractors and Sub-consultants to keep, accurate Bank and systematic accounts and records in respect of the Works / Goods / Services in such form and details as will clearly identify relevant time changes and costs. Pursuant to paragraph 2.2 e. of Appendix to the General Conditions the Contractor / Supplier / Consultant shall permit and shall cause its subcontractors and sub-consultants to permit, the Bank and/or persons appointed by the Bank to inspect the Site and/or the accounts and records relating to the performance of the Contract and the submission of the bid / proposal, and to have such accounts and records audited by auditors appointed by the Bank if requested by the Bank. The Contractor’s / Supplier’s / Consultant’s and its Subcontractors’ and sub- consultants’ acts intended to materially impede the exercise of the Bank’s inspection and audit rights constitute a prohibited practice subject to contract termination (as well as to a determination of ineligibility pursuant to the Bank’s prevailing sanctions procedures). Procurement thresholds, per method (US$ thousand) International National Request for Quotations Competitive Competitive (RFQ) Procurement Procurement Works Goods/N Works Goods/N Works Goods/NC C C 4 >5,00 >1,000 <5,000 < 1,000 <200 <100 0 Prior reviews threshold is shown below: Prior reviews threshold for Mongolia – 2017-2019 Category High and Moderate and low risk Substantial risk Works >US$ 1 million US$ > 1.5 million Goods – NC >US$ 500,000 US$ > 500,000 Consulting >US$ 400,000 US$ > 600,000 services (firm) Individual >US$ 150,000 > US$ 200,000 consultants 5 APPENDIX TO GENERAL CONDITIONS Fraud and Corruption (Text in this Appendix shall not be modified) 1. Purpose 1.1 The Bank’s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations. 2. Requirements 2.1 The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders, consultants, contractors and suppliers; any sub- contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption. 2.2 To this end, the Bank: a. Defines, for the purposes of this provision, the terms set forth below as follows: i. “corrupt practice” is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party; ii. “fraudulent practice” is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation; iii. “collusive practice” is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party; iv. “coercive practice” is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party; v. “obstructive practice” is: (a) deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of 6 matters relevant to the investigation or from pursuing the investigation; or (b) acts intended to materially impede the exercise of the Bank’s inspection and audit rights provided for under paragraph 2.2 e. below. b. Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub- contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question; c. In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring mis-procurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question, without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time they knew of the practices; d. Pursuant to the Bank’s Anti- Corruption Guidelines and in accordance with the Bank’s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;1 (ii) to be a nominated2 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project; e. Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank 1 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 2 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 7 loan, requiring (i) bidders, consultants, contractors, and suppliers, and their sub-contractors, sub-consultants, service providers, suppliers, agents personnel, permit the Bank to inspect3 all accounts, records and other documents relating to the submission of bids and contract performance, and to have them audited by auditors appointed by the Bank. 3 Inspections in this context usually are investigative (i.e., forensic) in nature. They involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to: accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information. 8 PROCUREMENT Mongolia : Ulaanbaatar Heating Sector Improvement Project PLAN General Information Country: Mongolia Bank’s Approval Date of the Original Procurement Plan: 2021-02-23 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170676 GPN Date: 2021-02-07 Project Name: Ulaanbaatar Heating Sector Improvement Project Loan / Credit No: IDA / 65890 U Executing Agency(ies): laanbaatar Heating Service Improvement Project WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned W-5A-5 / Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the Component 1: Rehabilitation Pending Single Stage - One 2022-11- point 1699 (667.8m.pair of IDA / 65890 and expansion of district Prior Request for Bids Open - National 3,085,857.20 0.00 Implementat 2021-08-20 2021-08-30 2021-09-29 2021-10-09 2021-10-26 Envelope 15 pipelines with steam pipeline heating network ion from the fixed pillar of point 183 to the end of the fixed pillar of point 237) W-5A-1 / Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to Component 1: Rehabilitation Pending 2F1000mm from TPP-3 to the Single Stage - One 2022-11- IDA / 65890 and expansion of district Prior Request for Bids Open - National 2,276,491.10 0.00 Implementat 2021-08-02 2021-08-09 2021-09-08 2021-09-20 2021-10-07 point 1699 (from point 12 to Envelope 16 heating network ion point 36 with 214 m.pair pipelines with steam pipeline (in the property of TPP-3)) W-5A-2 / Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the Component 1: Rehabilitation point 1699 (664m.pair of Single Stage - One 2,177,701.2 2021-11- IDA / 65890 and expansion of district Post Request for Bids Open - National 2,741,657.80 Signed 2021-03-05 2021-04-02 2021-03-15 2021-04-14 2021-05-12 2021-04-26 2021-05-25 2021-05-13 2021-06-17 pipelines with steam pipeline Envelope 9 15 heating network from the fixed pillar of point 36 inside the property of TPP- 3 JSC to the fixed pillar of point 66 W-5A-3 / Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the Component 1: Rehabilitation Single Stage - One 2,031,592.6 2021-11- point 1699 (628.5m.pair of IDA / 65890 and expansion of district Post Request for Bids Open - National 2,600,396.70 Signed 2021-03-08 2021-04-02 2021-03-18 2021-04-19 2021-05-12 2021-04-30 2021-05-25 2021-05-17 2021-06-17 Envelope 3 18 pipelines with steam pipeline heating network from the fixed pillar of point 66 to the end of the fixed pillar of point 125) W-5A-4 / Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the Component 1: Rehabilitation Single Stage - One 2,306,622.5 2021-11- point 1699 (From the fixed IDA / 65890 and expansion of district Post Request for Bids Open - National 2,630,240.60 Signed 2021-03-09 2021-04-02 2021-03-19 2021-04-21 2021-05-12 2021-05-03 2021-06-03 2021-05-20 2021-06-21 Envelope 3 16 pillar of point 125 to the end heating network of the fixed pillar of point 183 with 636m.pair of pipelines with steam pipeline) W-3G-7 / Expansion and rehabilitation of Component 1: Rehabilitation Single Stage - One 1,807,672.6 2021-11- 2F400/1F600mm 3G main IDA / 65890 and expansion of district Post Request for Bids Open - National 2,023,559.00 Signed 2021-03-04 2021-04-02 2021-03-09 2021-04-08 2021-05-12 2021-04-19 2021-06-03 2021-05-10 2021-06-21 Envelope 9 16 pipeline to 2F700mm from TK- heating network 521 to TK-328 W-5A-6 / Construction of Component 1: Rehabilitation Request for Request for Single Stage - One 2021-05- temporary steam-pipeline to IDA / 65890 and expansion of district Post Open - National Quotations (Non 125,400.00 125,345.98 Signed 2021-03-09 2021-06-10 2021-04-22 2021-06-17 Quotations Envelope 21 supply for TPP 3 consumers heating network Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Rehabilitation GO-CS-1 / 2 Vehicles to Single Stage - One IDA / 65890 and expansion of district Post Request for Bids Open - National 131,533.00 0.00 Canceled 2021-03-01 2021-03-09 2021-04-10 2021-04-20 2021-05-06 2021-06-20 support the UBDHC Envelope heating network Component 1: Rehabilitation GO-CS-1-1 / Vehicle to Request for Single Stage - One IDA / 65890 and expansion of district Post Open - National 98,255.00 0.00 Canceled 2021-04-26 2021-05-31 2021-07-02 supply the UBHSIP (1st) Quotations Envelope heating network Component 1: Rehabilitation GO-CS-1-2 / Vehicle to Request for Single Stage - One IDA / 65890 and expansion of district Post Open - National 33,278.00 0.00 Canceled 2021-04-26 2021-05-24 2021-06-25 supply the UBHSIP (2nd ) Quotations Envelope heating network GO-CS-1V / THE SUPPLY OF Component 1: Rehabilitation THE VEHICLES FOR THE Request for Single Stage - One IDA / 65890 and expansion of district Post Open - National 98,255.00 98,417.20 Signed 2021-04-26 2021-05-20 2021-06-03 2021-06-18 PROJECT IMPLEMENTATION Quotations Envelope heating network UNIT GO-CS-1S / THE SUPPLY OF Component 1: Rehabilitation THE VEHICLES FOR THE Request for Single Stage - One IDA / 65890 and expansion of district Post Open - National 33,278.00 31,634.10 Signed 2021-04-26 2021-05-20 2021-06-03 2021-06-18 PROJECT IMPLEMENTATION Quotations Envelope heating network UNIT Component 1: Rehabilitation Under GO-CS-2 / Laboratory Request for Single Stage - One IDA / 65890 and expansion of district Post Open - National 48,430.00 0.00 Implementati 2021-05-25 2021-07-08 2021-08-19 equipment for the UBDHC Quotations Envelope heating network on NON CONSULTING SERVICES Page 1 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-DD-3 / Consultancy service for Design and Component 1: Rehabilitation Consultant drawings of DH network to Pending IDA / 65890 and expansion of district Post Qualification Open - National 80,000.00 0.00 2021-05-10 2021-05-21 2021-06-09 2021-06-14 2021-07-01 2021-11-28 selected ger areas (Denjiin Implementation heating network Selection 1000 area, East west, Mongolian radio,TV area) CS-ES-4 / Consulting service for external monitoring firm Component 1: Rehabilitation Consultant for the implementation of IDA / 65890 and expansion of district Post Qualification Open - National 11,000.00 0.00 Under Review 2021-03-22 2021-05-27 2021-03-29 2021-04-27 2021-05-07 2021-05-23 2025-11-12 environment and social heating network Selection management plan of the UBHSIP INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-5A-1 / Consulting service for the author’s supervision with the amendment of the Component 1: Rehabilitation drawing and budget for IDA / 65890 and expansion of district Post Direct Selection Direct 151,363.40 139,174.55 Signed 2021-02-24 2021-03-29 2021-03-04 2021-04-02 2021-03-18 2021-06-03 2022-11-18 expansion and rehabilitation heating network of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the point 1699 CS-3G-2 / Consulting service for the author’s supervision with the amendment of the Component 1: Rehabilitation drawing and budget for IDA / 65890 and expansion of district Post Direct Selection Direct 28,401.10 23,356.88 Signed 2021-02-26 2021-03-29 2021-03-08 2021-04-02 2021-03-22 2021-06-03 2021-11-17 expansion and rehabilitation heating network of 2F400/1F600mm 3G main pipeline to 2F700mm from TK- 521 to TK-328 IC-CS-5 / INDIVIDUAL CONSULTING SERVICE FOR Component 1: Rehabilitation Individual Pending “THE ULAANBAATAR HEATING IDA / 65890 and expansion of district Post Consultant Open 42,125.00 0.00 2021-06-28 2021-07-19 2021-07-22 2021-08-06 2025-10-15 Implementation SECTOR IMPROVEMENT heating network Selection PROJECT” CIVIL ENGINEER IC-CS-6 / INDIVIDUAL CONSULTING SERVICE FOR Component 1: Rehabilitation Individual “THE ULAANBAATAR HEATING Pending IDA / 65890 and expansion of district Post Consultant Open 42,125.00 0.00 2021-06-28 2021-07-22 2021-07-26 2021-08-06 2025-10-15 SECTOR IMPROVEMENT Implementation heating network Selection PROJECT” ELECTRICAL ENGINEER CS-TS-7 / Consulting service for the author’s supervision Component 1: Rehabilitation Individual for construction of temporary IDA / 65890 and expansion of district Post Consultant Direct 1,200.00 0.00 Under Review 2021-06-28 2021-06-25 2021-06-30 2021-07-04 2021-07-07 2021-08-03 steam-pipeline to supply for heating network Selection TPP 3 consumers Page 2 PROCUREMENT PLAN - Textual Part Project information: Uzbekistan Medium-Size Cities Integrated Urban Development Project (P162929) Project Implementation agency: “State Investment Committee” or “SIC” means the Borrower’s governmental body established pursuant to the Borrower’s Presidential Decree No. УП-4996 “On the Formation of the State Committee of the Republic of Uzbekistan for Investments” dated March 31, 2017 Date of the Procurement Plan: November 7, 2018 Period covered by this Procurement Plan: From November 2018 to November 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Law of Republic of Uzbekistan “On Public Procurement” dated January 25, 2018 such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The Bank’s Anti-Corruption Guidelines and Sanctions Framework shall be incorporated into the national bidding documents by adding a page entitled “Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework”. 2. Contracts with an appropriate allocation of responsibilities, risks, and liabilities between the Borrower and the contractors/suppliers/consultants. 3. Rights for the Bank to review procurement documentation and activities. In accordance with the Procurement Regulations, each bidding document and contract shall include provisions stating the Bank's policy to sanction firms or individuals, found to have engaged in fraud and/or corruption as defined in the Procurement Regulations. In accordance with the Procurement Regulations, each bidding document and contract financed out of the proceeds of the Financing Agreement shall provide that bidders, suppliers, contractors and their subcontractors, agents, personnel, consultants, service providers, or suppliers shall permit the Bank to inspect all accounts, records and other documents relating to the bid submission and performance of the contract and to have said accounts and records audited by auditors appointed by the Bank. Acts intended to materially impede the exercise of the Bank's inspection and audit rights provided for in the Procurement Regulations constitute an obstructive practice as defined in the Regulations. 4. No bids shall be rejected solely because they fall below or exceed the estimated cost. All bids (including in the case when less than two bids are received) shall not be rejected, the procurement process shall not be cancelled, and new bids shall not be solicited without the Bank's prior written concurrence. The Bidding Documents template to be used under “national open competitive procurement arrangements” are subject to prior written concurrence by the Bank. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables. PROCUREMENT Uzbekistan : Medium-Size Cities Integrated Urban Development Project PLAN General Information Country: Uzbekistan Bank’s Approval Date of the Original Procurement Plan: 2019-01-15 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162929 GPN Date: Project Name: Medium-Size Cities Integrated Urban Development Project Loan / Credit No: TF / A7556, IBRD / 89140 State Investment Committee of the Republic of Uzbekistan Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MSC/UZB-C/W/1.6 / Restoration/strengthening and adaptive reuse in Component 1: Improvement accordance to modern energy of Urban Services and Single Stage - One 2020-11- IBRD / 89140 Post Request for Bids Open - National 0.00 Canceled 2020-02-12 2020-02-12 2020-02-17 2020-02-15 2020-03-30 2020-05-14 2020-04-29 2020-09-09 2020-06-03 efficiency norms of the former Enhancement of Public Urban Envelope 30 Kindergarten #17 and Spaces Administrative building at the Chartak city MSC/UZB-C/W/1.6.1 / Restoration/strengthening and adaptive reuse in Component 1: Improvement accordance to modern energy of Urban Services and Single Stage - One 2021-06- IBRD / 89140 Post Request for Bids Open - National 0.00 Canceled 2020-09-09 2020-09-11 2020-09-14 2020-09-11 2020-10-26 2020-08-05 2020-11-18 2020-09-11 2020-12-23 efficiency norms of the former Enhancement of Public Urban Envelope 21 Kindergarten #17 and Spaces Administrative building at the Chartak city MSC/UZB-C/W/1.6.2 / Restoration/strengthening and adaptive reuse in Component 1: Improvement accordance to modern energy of Urban Services and Single Stage - One 2021-06- IBRD / 89140 Post Request for Bids Open - National 459,525.50 Signed 2020-09-11 2020-07-04 2020-09-16 2020-10-28 2020-08-05 2020-11-27 2020-08-28 2021-01-01 2020-10-05 efficiency norms of the former Enhancement of Public Urban Envelope 30 Kindergarten #17 and Spaces Administrative building at the Chartak city. MSC-CKY/W/2.1 / Component 2: Institutional Construction / Repair of Single Stage - One 2021-08- IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 0.00 Canceled 2020-10-23 2020-11-24 2020-11-02 2020-11-24 2020-12-14 2020-12-24 2021-01-13 2021-01-21 2021-02-17 Garage Premises for Municipal Envelope 16 Building Equipment in the Chartak city MSC-CKY/W/2.2 / Component 2: Institutional Construction / Repair of Single Stage - One 2021-08- IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 0.00 Canceled 2020-10-23 2020-11-24 2020-10-28 2020-11-24 2020-12-09 2020-12-24 2021-01-08 2021-01-21 2021-02-12 Garage Premises for Municipal Envelope 11 Building Equipment in the Kagan city MSC-CKY/W/2.3 / Component 2: Institutional Construction / Repair of Single Stage - One 2021-08- IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 0.00 Canceled 2020-10-23 2020-11-24 2020-10-28 2020-11-24 2020-12-09 2020-12-24 2021-01-08 2021-01-21 2021-02-12 Garage Premises for Municipal Envelope 11 Building Equipment in the Yangiyul city MSC-СKY/W/2.1.1 / Construction of garages for Component 2: Institutional Single Stage - One 2021-12- parking and maintenance of IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 332,777.08 Signed 2021-02-11 2021-02-15 2021-02-21 2021-02-16 2021-04-04 2021-03-19 2021-05-04 2021-05-07 2021-06-08 2021-06-09 Envelope 05 special equipment in Chartak, Building Namangan region. MSC-СKY/W/2.2.1 / Construction of garages for Component 2: Institutional Single Stage - One 2021-12- parking and maintenance of IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 300,299.26 Signed 2021-02-11 2021-02-15 2021-02-21 2021-02-16 2021-04-04 2021-03-19 2021-05-04 2021-05-07 2021-06-08 2021-06-14 Envelope 05 special equipment in Kagan, Building Bukhara region. MSC-СKY/W/2.3.1 / Construction of garages for Component 2: Institutional Single Stage - One 2021-12- parking and maintenance of IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National 0.00 Canceled 2021-02-11 2021-02-15 2021-02-21 2021-02-16 2021-04-04 2021-03-19 2021-05-04 2021-05-07 2021-06-08 Envelope 05 special equipment in Yangiyul, Building Tashkent region. MSC-C/W/1.4 / Request for Component 1: Improvement Reconstruction of the existing Bids - Small Under of Urban Services and Single Stage - One 2022-09- building of the "Old Bazaar" IBRD / 89140 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-24 2021-05-27 2021-06-01 2021-05-31 2021-07-15 2021-08-16 2021-09-27 Enhancement of Public Urban Envelope 30 located in Chartak city, envelope ion Spaces Namangan region process) MSC-СKY/W/2.3.1.1 / Request for Construction of garages for Component 2: Institutional Bids - Small Under Single Stage - One 2022-03- parking and maintenance of IBRD / 89140 Strengthening and Capacity Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-31 2021-05-31 2021-06-05 2021-05-31 2021-07-17 2021-08-16 2021-09-20 Envelope 19 special equipment in Yangiyul, Building envelope ion Tashkent region. process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MSC/UZB-G-RFQ/2.1 / Strengthening the material Component 2: Institutional Request for Single Stage - One and technical base of the IBRD / 89140 Strengthening and Capacity Post Open - National 98,087.01 Completed 2020-02-12 2020-02-26 2020-02-27 2020-02-24 2020-04-30 2020-05-14 Quotations Envelope State Committee Tourism Building Development MSC/UZB-G/2.1 / Procurement of Special Component 2: Institutional Single Stage - One equipment for khokimiyats of IBRD / 89140 Strengthening and Capacity Prior Request for Bids Open - International 0.00 Canceled 2020-02-28 2020-02-27 2020-02-29 2020-03-05 2020-03-31 2020-05-14 2020-04-30 2020-09-15 2020-06-04 2020-12-01 Envelope Chartak, Kagan and Yangiyul Building cities Page 1 MSC/UZB-G/2.1.1 / Procurement of Special Component 2: Institutional Single Stage - One equipment for khokimiyats of IBRD / 89140 Strengthening and Capacity Prior Request for Bids Open - International 3,087,093.00 Signed 2020-09-14 2020-09-16 2020-09-19 2020-09-17 2020-10-31 2020-01-03 2020-11-30 2021-03-04 2021-01-04 2021-03-31 2021-07-03 Envelope Chartak, Kagan and Yangiyul Building cities NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MSCIUDP-CS/QCBS-03-02 / Development of feasibility study,detailed designs and construction supervision, for Component 1: Improvement the upgrading and of Urban Services and Quality And Cost- improvements of three cities TF / A7556 Prior Open - International 1,028,000.00 Signed 2018-10-04 2018-10-08 2018-11-21 2019-03-28 2018-12-19 2019-01-18 2019-05-02 2019-02-22 2019-09-11 2019-03-29 2019-11-08 2020-03-28 Enhancement of Public Urban Based Selection of Uzbekistan. The first Lump- Spaces Sum contract to be financed by ECAPDEV Grant and Second and Third contracts by IBRD Loans. UDP-CS/CQS-5 / Consultant Component 1: Improvement Consultant Firm for Environmental and of Urban Services and TF / A7556 Post Qualification Open - International 0.00 Canceled 2019-01-23 2018-08-06 2019-02-13 2019-03-29 2019-04-28 2019-06-02 2019-11-29 Social Safeguards, including Enhancement of Public Urban Selection training and RPF Spaces Component 1: Improvement UDP-CS/CQS-6 / M&E Consultant of Urban Services and surveys (beneficiary TF / A7556 Post Qualification Open - International 0.00 Canceled 2019-01-23 2018-11-15 2019-02-13 2019-03-29 2019-04-28 2019-01-17 2019-06-02 2019-11-29 Enhancement of Public Urban satisfaction survey) Selection Spaces Component 1: Improvement Consultant UDP-CS/CQS-04 / Grant of Urban Services and TF / A7556 Post Qualification Open - International 0.00 Canceled 2019-01-30 2019-02-20 2019-04-05 2019-05-05 2019-06-09 2019-12-06 Audit Enhancement of Public Urban Selection Spaces UDP-CS/CQS-01 / Preparation of detailed Component 1: Improvement designs DDs and Bidding Consultant of Urban Services and Documents, and construction IBRD / 89140 Post Qualification Open - International 80,000.00 Signed 2019-03-06 2019-03-05 2019-03-08 2019-03-25 2019-03-20 2019-03-28 2019-04-05 2019-04-01 2019-04-09 2019-09-30 Enhancement of Public Urban supervision. For the Phase 1 - Selection Spaces US $ 30 000 Lump Sum, Phase 2 - US $ 50 000 Time Based. MSCIUDP-CS/QCBS-05-02 / Development of a National Component 2: Institutional Monitoring and Evaluation Quality And Cost- IBRD / 89140 Strengthening and Capacity Post Open - International 0.00 Canceled 2019-09-27 2019-10-18 2019-12-01 2019-12-29 2020-01-28 2020-03-03 2020-04-07 2021-04-07 (M&E) system for the Based Selection Building sustainable Tourism & Travel sector in Uzbekistan MSCIUDP-CS/QCBS-06-01 / Analysis and Assessment of Component 2: Institutional the Financing of Urban Quality And Cost- IBRD / 89140 Strengthening and Capacity Prior Open - International 0.00 Canceled 2019-09-27 2019-10-18 2019-12-01 2019-12-29 2020-01-28 2020-03-03 2020-04-07 2021-04-07 Development and Based Selection Building Intergovernmental Fiscal Relations in Uzbekistan MSCIUDP-CS/QCBS-05-01 / Development of new susainable tourism destinations, including Component 2: Institutional Quality And Cost- Pending promotion, marketing & IBRD / 89140 Strengthening and Capacity Post Open - International 0.00 2019-11-05 2019-11-26 2020-01-09 2020-02-06 2020-03-07 2020-04-11 2020-05-16 2021-05-16 Based Selection Implementation branding strategy and action Building plan, for (i) the Fergana Valley and (ii) Bukhara Region in Uzbekistan MSC-PA/3.1 / Consultant for Component 3: Least Cost IBRD / 89140 Post Open - International 29,500.00 Signed 2020-06-19 2020-06-24 2020-07-10 2020-07-29 2020-08-23 2020-12-21 2020-09-20 2021-01-22 2020-10-20 2021-04-14 2020-11-24 2021-05-05 2020-12-29 2021-05-10 2021-06-27 Audit Implementation Support Selection MSC-CKY/CS/1.1 / Preparation of Detailed Design Component 1: Improvement and Bidding Documents, and of Urban Services and Quality And Cost- Under IBRD / 89140 Prior Open - International 0.00 2020-06-26 2020-06-30 2020-07-17 2020-08-27 2020-08-30 2021-01-08 2020-09-27 2021-02-11 2020-10-27 2021-06-17 2020-12-01 2021-01-05 2022-01-05 Construction Supervision for Enhancement of Public Urban Based Selection Implementation integrated urban upgrading in Spaces the three pilot cities. MSC-MA/3.2 / Project Monitoring and Evaluation Component 3: Fixed Budget IBRD / 89140 Post Open - International 79,700.00 Signed 2020-06-29 2020-09-11 2020-07-20 2020-09-11 2020-09-02 2021-02-01 2020-09-30 2021-03-09 2020-10-30 2021-04-14 2020-12-04 2021-05-05 2021-01-08 2021-05-10 2022-01-08 Baseline Survey and Implementation Support Selection Beneficiary Satisfaction MSC-CS/2.3 / Advisory Services to State Committee Component 2: Institutional Quality And Cost- Under on Tourism Development on IBRD / 89140 Strengthening and Capacity Prior Open - International 0.00 2020-06-29 2020-06-30 2020-07-20 2020-08-31 2020-09-02 2021-02-11 2020-09-30 2021-03-17 2020-10-30 2020-12-04 2021-01-08 2022-01-08 Based Selection Implementation developing comprehensive Building strategy MSCIUDP-CS/QCBS-04-01 / Detailed Design, Bidding Documents, and Supervision Component 1: Improvement for Restoration and adaptive of Urban Services and Quality And Cost- Under reuse of (i) Emir's Palace; (ii) IBRD / 89140 Prior Open - International 0.00 2019-09-30 2020-08-17 2019-10-21 2020-08-31 2019-12-04 2021-05-27 2020-01-01 2020-01-31 2020-03-06 2020-04-10 2021-04-10 Enhancement of Public Urban Based Selection Implementation Italian Hotel; and (iii) Russian Spaces Consulate (Makhalla Committee Building) in Kagan (Bukhara region) Page 2 MSC-CS/2.2 / Analysis and Assessment of the Financing Component 2: Institutional Quality And Cost- Under of Urban Development and IBRD / 89140 Strengthening and Capacity Prior Open - International 0.00 2020-12-01 2020-12-02 2020-12-01 2020-12-07 2021-01-19 2021-06-02 2021-02-16 2021-03-18 2021-04-22 2021-05-27 2022-05-27 Based Selection Implementation Intergovernmental Fiscal Building Relations in Uzbekistan INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Improvement UDP-CS/SSS-01 / Feasibility of Urban Services and Studies and detailed designs TF / A7556 Prior Direct Selection Direct 0.00 Under Review 2019-01-23 2019-02-02 2019-04-08 2019-10-05 Enhancement of Public Urban for Year-1 Chartak Eco-trail Spaces MSCIUDP-CS/IND-02/1 / Individual Component 3: Project Implementation Unit TF / A7556 Prior Consultant Open 0.00 Canceled 2019-01-23 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Implementation Support Manager Selection Individual MSCIUDP-CS/IND-02/4 / Component 3: TF / A7556 Post Consultant Open 0.00 Canceled 2019-01-23 2018-08-31 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Sociologist Implementation Support Selection Individual MSCIUDP-CS/IND-02/5 / Component 3: TF / A7556 Post Consultant Open 0.00 Canceled 2019-01-23 2018-09-28 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Ecologist Implementation Support Selection Individual MSCIUDP-CS/IND-02/6 / Component 3: TF / A7556 Post Consultant Open 0.00 Canceled 2019-01-23 2018-09-10 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Engineer Implementation Support Selection MSCIUDP-CS/IND-02/3 / Individual Component 3: Financial management TF / A7556 Post Consultant Open 0.00 Canceled 2019-01-23 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Implementation Support specialist Selection Individual MSCIUDP-CS/IND-02/2 / Component 3: TF / A7556 Post Consultant Open 0.00 Canceled 2019-03-06 2019-04-24 2019-05-15 2019-06-19 2019-12-16 Procurement specialist Implementation Support Selection MSC-C/CS/1.1 / Consulting services for the development Component 1: Improvement of detailed design, bidding of Urban Services and documents and construction IBRD / 89140 Post Direct Selection Direct 0.00 Canceled 2020-03-26 2020-02-03 2020-04-05 2020-02-28 2020-06-09 2021-04-01 Enhancement of Public Urban supervision of the Chartak Eco- Spaces Trail for non-motorized mobility in the city of Chartak MSC-CKY/CS/2.3.1.1 / Advisory Services to Ministry of Construction on Component 2: Institutional Individual modernization of Urban and IBRD / 89140 Strengthening and Capacity Post Consultant Open 0.00 Canceled 2020-06-29 2020-06-29 2020-08-17 2021-01-08 2020-09-07 2020-10-12 2021-04-10 Regional Planning Practices in Building Selection Uzbekistan (phase 1 - international) MSC-CKY/CS/2.3.1.2 / Advisory Services to Ministry Component 2: Institutional Individual of Construction on IBRD / 89140 Strengthening and Capacity Post Consultant Open 16,000.00 Signed 2020-06-29 2020-06-29 2020-08-17 2020-11-25 2020-09-07 2020-12-07 2020-10-12 2021-02-25 2021-04-10 modernization of Urban and Building Selection Regional Planning Practices in Uzbekistan (phase 1 - local) MSC-C/CS/1.1.1 / Consulting services for the development of detailed Component 1: Improvement design, bidding documents of Urban Services and IBRD / 89140 Post Direct Selection Direct 424,900.00 Signed 2020-08-05 2020-08-05 2020-08-05 2020-08-05 2020-08-05 2020-04-22 2021-10-05 and construction supervision Enhancement of Public Urban of the Chartak Eco-Trail for Spaces non-motorized mobility in the city of Chartak MSC-CKY/CS/2.1 / Consultant for Development of Detailed Designs and Bid documents, and Construction Component 2: Institutional Supervision for the IBRD / 89140 Strengthening and Capacity Post Direct Selection Direct 91,600.00 Signed 2020-03-26 2020-04-07 2020-04-05 2020-05-13 2020-06-09 2020-05-15 2020-12-06 Construction / Repair of Building Garage Premises in the cities of Chartak, Kagan and Yangiyul. MSC-CKY/CS/2.3.1.1.1 / Advisory Services to Ministry of Construction on Component 2: Institutional Individual Under modernization of Urban and IBRD / 89140 Strengthening and Capacity Post Consultant Open 0.00 2021-04-12 2021-04-14 2021-05-31 2021-06-21 2021-07-26 2022-01-22 Implementation Regional Planning Practices in Building Selection Uzbekistan (phase 1 - international) Page 3 12 MONTHS PROCUREMENT PLAN Project information: Case Study on Integrated Delivery of Selected Non-Communicable Diseases in Kenya (P164301) Project Implementation agency: Moi Teaching and Referral Hospital Date of the Procurement Plan: August 2018 Period covered by this Procurement Plan: One year Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: Paragraph 5.3 of the Procurement Regulations will not apply. When approaching the national market, the country’s own procurement procedures shall not be used due to restrictions on eligibility of otherwise eligible firms to participate in NCB. The Regulations will apply. However, the Borrower may use its own procurement arrangements as set forth in the Public Procurement and Disposal Act, 2003 Request for Quotation such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods : Applicable for those contracts identified in the Procurement Plan tables Works: applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information:- (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the IWMDP ): Thresholds*, Procurement Methods, and Prior Review Contract (C) Expenditure Value Procurement Contracts Subject to No Category Threshold* Method Prior Review /[eq. US$] [eq. USD] All contracts at or above USD 10 million are Open Competition subject to international advertising and the International Market use of the Bank’s SPDs (or other C ≥ 10,000,000 Approach and Direct documents agreed with the Bank), as well Contracting as the first contract under Open Competition 1 Works Open Competition 200,000 < C < National Market None except if it is the first contract under 10,000,000 Approach Open Competition. C ≤ 200,000 RfQ None All contracts at or above USD 2 million are Open Competition subject to international advertising and the Goods, IT and International Market use of the Bank’s SPDs (or other 2 non-consulting C ≥ 2,000,000 Approach and Direct documents agreed with the Bank), as well services as the first contract under Open Contracting Competition. Contract (C) Expenditure Value Procurement Contracts Subject to No Category Threshold* Method Prior Review /[eq. US$] [eq. USD] Open Competition : National Market None except if it is the first contract under 100,000 < C < Approach Open Competition. 2,000,000 C ≤ 100,000 RfQ None All contracts at or above USD 300,000 are for subject to international advertising and the C < 300,000 Consulting Services use of the Bank’s SPDs (or other selection of documents agreed with the Bank). 3 consultant firms All contracts at or above USD 300,000 are For Engineering and subject to international advertising and the C ≤ 300,000 Construction Supervision use of the Bank’s SPDs (or other documents agreed with the Bank). Selection of ≥ 300,000 ≥ 300,000 4 Individual All Approaches consultants Training, Workshops, Based on approved This line activity is not subject to 5 Study Tours All Values Annual Work Plan & procurement Review. Budgets (AWPB) by TTL * All contracts not subject to prior review will be post-reviewed. ** Short lists of consultants for services estimated to cost less US$300,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. However, if foreign firms have expressed interest, they will not be excluded from consideration. Prior review Thresholds High Substantial Procurement Type Risk Risk Works 5.0 10.0 Goods, It & Non-Consulting 1.5 2.0 Services Consultants (Firms) 0.5 1.0 Individual Consultants 0.2 0.3 Prequalification. Not expected for any works or goods packages in the procurement plan. Proposed Procedures for CDD Components: Applicable Reference to (if any) Project Operational/Procurement Manual: the IWMDP team will prepare a Procurement manuals, which will also be part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Kenya : Case Study on Integrated Delivery of Selected Non-Communicable Diseases in Kenya PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2018-08-24 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164301 GPN Date: Project Name: Case Study on Integrated Delivery of Selected Non-Communicable Diseases in Kenya Loan / Credit No: TF / A5636 Moi Teaching and Referral Hospital Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-MTRH-196211-CW-RFQ / Pending RENOVATION OF PHARMACY Request for Single Stage - One 2021-05- TF / A5636 Post Open - National 2,200.00 0.00 Implementat 2020-10-03 2020-11-28 SPACES FOR NAMBALE SUB Quotations Envelope 27 ion COUNTY HOSPITAL GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MTRH-68796-GO-RFQ / Pending Request for Single Stage - One Purchase of 2900 *50's TF / A5636 Post Limited 79,750.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 Quotations Envelope glucose strips on KE-MTRH-68800-GO-RFQ / Pending Request for Single Stage - One Purchase of 192 manual adult TF / A5636 Post Limited 28,800.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 Quotations Envelope weight meters on KE-MTRH-68842-GO-RFQ / Pending Procurement of assorted IT Request for Single Stage - One TF / A5636 Post Limited 7,700.00 0.00 Implementati 2018-09-01 2018-10-27 2019-04-25 equipment (6 recorders and 9 Quotations Envelope on Laptops) KE-MTRH-69303-GO-RFQ / Pending Purchase of 2000 tests of urea Request for Single Stage - One TF / A5636 Post Limited 5,644.00 0.00 Implementati 2018-09-01 2018-10-27 2019-04-25 and 400 Tests of creatinine Quotations Envelope on reagents Pending KE-MTRH-69552-GO-RFQ / Request for Single Stage - One TF / A5636 Post Limited 48,147.00 0.00 Implementati 2018-09-01 2018-10-27 2019-04-25 Purchase of assorted drugs Quotations Envelope on KE-MTRH-69652-GO-RFQ / Pending Request for Single Stage - One Purchase of 18,000* 10 Tests TF / A5636 Post Limited 54,000.00 0.00 Implementati 2018-08-25 2018-10-20 2019-04-18 Quotations Envelope of HBA1c on KE-MTRH-73508-GO-RFQ / Purchase of 73 no. manual Pending Request for Single Stage - One blood pressure machines and TF / A5636 Post Limited 19,000.00 0.00 Implementati 2018-08-25 2018-10-20 2019-04-18 Quotations Envelope 187 no. automatic blood on pressure machines KE-MTRH-74086-GO-RFQ / Purchase of assorted pelvic examination supplies (40 Pending metallic speculums,1800 Request for Single Stage - One TF / A5636 Post Limited 7,650.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 disposable speculums,20 pcs Quotations Envelope on of macintosh, 1000 pkts clean gloves, 300 pkts sanitary pads and 10 patient screens) KE-MTRH-74098-GO-RFQ / Pending Request for Single Stage - One Purchase of assorted patient TF / A5636 Post Limited 2,492.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 Quotations Envelope documentation supplies on KE-MTRH-74104-GO-RFQ / Pending Procurement of printed Request for Single Stage - One TF / A5636 Post Limited 14,460.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 campaign materials (241 no. Quotations Envelope on Flip charts) KE-MTRH-74108-GO-RFQ / Purchase of assorted office Pending stationery (30 reams of Request for Single Stage - One TF / A5636 Post Limited 990.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 printing papers, 5 extension Quotations Envelope on cables and 10 pieces of printer toners) KE-MTRH-69647-GO-RFQ / Purchase of assorted biopsy supplies-100 plastic bottles,200 biopsy needles Pending Request for Single Stage - One G.14,5 formaldehyde*PCs,5 l TF / A5636 Post Limited 48,905.00 0.00 Implementati 2018-10-05 2018-11-30 2019-05-29 Quotations Envelope vinegar*PCs,180*500 g on buffers ,2000*50's of fiber tipped sticks,1000 surgical gloves among others KE-MTRH-68803-GO-RFQ / Purchase of education and screening supplies-12 tables,24 chairs,14884 batteries,50tape measures, Pending 110*40g cotton wool, Request for Single Stage - One TF / A5636 Post Limited 49,657.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 40,000prickers,66 tins Quotations Envelope on spirit,15 bags,61umbrellas,350T- shirts,61 Lab coats,1872 posters/fliers,55400 patient cards100 registers & others Page 1 KE-MTRH-69556-GO-RFQ / Procurement of assorted training and conference materials Pending Request for Single Stage - One 800 pcs A5 notebooks,800pc TF / A5636 Post Limited 1,434.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 Quotations Envelope clear plastic bags, 40pkts biro on pens,4 doz felt pens,100 pcs manila papers A1, 100 pcs flip charts KE-MTRH-69637-GO-RFQ / Purchase of assorted VIA supplies-10 bales tissues ,70 buckets,960 pcs normal saline,40 hand towel,60 pcs Pending Request for Single Stage - One soap,200 garbage collection TF / A5636 Post Limited 6,315.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 Quotations Envelope bags,20*5l vinegar,100*400g on cotton wool,50 pc KY jelly,100*50 pregnancy test kits,20 forceps,100*20l distilled water etc KE-MTRH-204575-GO-RFQ / Pending Purchase of HbA1C Cartridges TF / A5636 Post Direct Selection Direct 9,600.00 0.00 Implementati 2020-11-13 2020-11-18 2020-12-23 2021-06-21 for controlling level of sugars on on diabetic patients KE-MTRH-204662-GO-RFQ / Pending Request for Single Stage - One Purchase of nitrous gas for TF / A5636 Post Open - National 4,320.00 0.00 Implementati 2020-11-18 2021-01-13 2021-07-12 Quotations Envelope cryotherapy-16563L on KE-MTRH-204486-GO-RFQ / Pending Purchase of stationery to be Request for Single Stage - One TF / A5636 Post Open - National 1,737.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 used to facilitate the Quotations Envelope on operation of the project KE-MTRH-204571-GO-RFQ / Pending Request for Single Stage - One Purchase of car rims for TF / A5636 Post Open - National 700.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 Quotations Envelope project vehicle . on KE-MTRH-204577-GO-RFQ / Pending Purchase of 50 pairs of Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 240.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Batteries AAA energizer to be Quotations Envelope on used on thermo guns. KE-MTRH-204665-GO-RFQ / Purchase of medical Pending Request for Single Stage - One equipment: TF / A5636 Delivery of NCD Services Post Limited 8,100.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Quotations Envelope 1.Creatinine kit-60 pieces on 2.Electrolyte pack-15 pieces KE-MTRH-204667-GO-DIR / Purchase of the following Pending Request for Single Stage - One items: 1.Tissue -20 Bales (40 TF / A5636 Delivery of NCD Services Post Limited 1,679.80 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 Quotations Envelope tissues per bale) 2. Hand on sanitizers 500 ml-300 Pieces KE-MTRH-209087-GO-RFQ / Pending Request for Single Stage - One Procurement of assorted TF / A5636 Delivery of NCD Services Post Limited 27,902.74 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 Quotations Envelope drugs for hypertension on KE-MTRH-209073-GO-RFQ / Pending Request for Single Stage - One Purchase of crea kit Chemistry TF / A5636 Delivery of NCD Services Post Limited 2,325.60 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 Quotations Envelope Analyzer -60 kits on Pending KE-MTRH-215567-GO-RFQ / Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 1,500.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 PURCHASE OF LAPTOP Quotations Envelope on KE-MTRH-215569-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF 1100 BOXES OF TF / A5636 Delivery of NCD Services Post Limited 15,400.00 0.00 Implementati 2021-02-06 2021-04-03 2021-09-30 Quotations Envelope CLEAN GLOVES on KE-MTRH-215566-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF 2 PIECES OF TF / A5636 Delivery of NCD Services Post Limited 240.00 0.00 Implementati 2021-02-06 2021-04-03 2021-09-30 Quotations Envelope WIRELESS ROUTERS on KE-MTRH-215559-GO-RFQ / Pending Request for Single Stage - One Purchase of two Ultrasound TF / A5636 Delivery of NCD Services Post Limited 54,000.00 0.00 Implementati 2021-02-06 2021-04-03 2021-09-30 Quotations Envelope Digital Machines on KE-MTRH-216040-GO-RFQ / Purchase of Assorted human drugs; Pending Request for Single Stage - One 1. Enalapril 5mg-1200 TF / A5636 Delivery of NCD Services Post Limited 1,677.00 0.00 Implementati 2021-02-06 2021-04-03 2021-09-30 Quotations Envelope packets on 2. Lisinopril 20mg-500 packets KE-MTRH-216047-GO-RFQ / Pending Request for Single Stage - One Purchase of two pieces of TF / A5636 Delivery of NCD Services Post Limited 80,000.00 0.00 Implementati 2021-02-09 2021-04-06 2021-10-03 Quotations Envelope Cryotherapy units on KE-MTRH-220069-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF 256 BOXES OF TF / A5636 Delivery of NCD Services Post Limited 4,352.00 0.00 Implementati 2021-02-27 2021-04-24 2021-10-21 Quotations Envelope GLOVES on KE-MTRH-220075-GO-RFQ / PURCHASE OF; Pending Request for Single Stage - One 1. PHOTOCOPY PAPERS-95 TF / A5636 Delivery of NCD Services Post Limited 830.00 0.00 Implementati 2021-02-27 2021-04-24 2021-10-21 Quotations Envelope BOXES on 2. TONERS-10 PIECES KE-MTRH-220533-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF LEEP TF / A5636 Delivery of NCD Services Post Limited 14,000.00 0.00 Implementati 2021-03-05 2021-04-30 2021-10-27 Quotations Envelope EQUIPMENT -QUANTITY 2 on KE-MTRH-221883-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF HBAIC TF / A5636 Delivery of NCD Services Post Limited 44,415.00 0.00 Implementati 2021-03-12 2021-05-07 2021-11-03 Quotations Envelope MACHINES-10 PIECES on Page 2 KE-MTRH-221888-GO-RFQ / PURCHASE OF; Pending 1.TENTS WITH GAZEBO 100 Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 6,072.00 0.00 Implementati 2021-03-12 2021-05-07 2021-11-03 SEATER- 3 PIECES Quotations Envelope on 2 . PLASTIC CHAIRS- 300 PIECES KE-MTRH-222511-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF LEEP TF / A5636 Delivery of NCD Services Post Limited 14,000.00 0.00 Implementati 2021-03-13 2021-05-08 2021-11-04 Quotations Envelope EQUIPMENT-2 PIECES on KE-MTRH-222515-GO-RFQ / PURCHASE OF; 1.STETHOSCOPE LITMAN-12 PIECES 2.METALLIC SPECULUMS Pending (SMALL)-50PIECES Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 3,963.20 0.00 Implementati 2021-03-13 2021-05-08 2021-11-04 3.METALLIC SPECULUMS Quotations Envelope on (MEDIUM)-300PIECES 4.METALLIC SPECULUMS(LARGE)-50PIECES 5. CERVICAL BIOPSY FORCEPS- 24 PIECES KE-MTRH-221891-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF INSULIN 70/30 TF / A5636 Delivery of NCD Services Post Limited 1,500.00 0.00 Implementati 2021-03-12 2021-05-07 2021-11-03 Quotations Envelope VIALS-QUANTITY 500 on KE-MTRH-231497-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF ASSORTED TF / A5636 Delivery of NCD Services Post Limited 29,993.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 Quotations Envelope HUMAN DRUGS on KE-MTRH-231459-GO-RFQ / Pending PURCHASE OF ; Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 4,760.00 0.00 Implementati 2021-05-12 2021-05-24 2021-06-23 1. 1000 PIECES OF KY JELLY Quotations Envelope on 2. 3932 PIECES OF VINEGAR KE-MTRH-231461-GO-RFQ / PURCHASE OF; Pending 1. 400 PIECES OF COTTON Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 6,740.00 0.00 Implementati 2021-05-12 2021-05-24 2021-06-23 WOOL Quotations Envelope on 2. 6000 PIECES OF SANITARY TOWELS KE-MTRH-231443-GO-RFQ / PURCHASE OF; Pending 1. 200 PIECES OF METTALIC Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 10,500.00 0.00 Implementati 2021-05-12 2021-05-24 2021-06-23 SPECULUMS Quotations Envelope on 2. 1200 PIECES OF DISPOSABLE SPECULUMS KE-MTRH-231510-GO-DIR / Pending PURCHASE OF 14 PIECES OF TF / A5636 Delivery of NCD Services Post Direct Selection Direct 35,000.00 0.00 Implementati 2021-05-28 2021-05-29 2021-05-31 2021-06-30 BIOPSY GUNS on KE-MTRH-240615-GO-RFQ / Pending PURCHASE OF 13 PIECES OF Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 78,000.00 0.00 Implementati 2021-06-24 2021-07-10 2021-08-09 WISAP CERVICAL COLD Quotations Envelope on THERMOCOAGULATORS KE-MTRH-240731-GO-RFQ / Pending PURCHASE OF 10 PIECES OF Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 25,439.00 0.00 Implementati 2021-06-24 2021-07-04 2021-08-03 ELECTROCARDIOGRAPH Quotations Envelope on MACHINE WITH TROLLEY NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MTRH-68840-NC-RFQ / Procurement of radio Pending Request for Single Stage - One advertisement services once TF / A5636 Post Limited 1,000.00 0.00 Implementati 2018-09-01 2018-10-27 2019-04-25 Quotations Envelope every two months for year 1 in on the local radio stations CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MTRH-96604-CS-INDV / Procurement of costing consultant-Health Economics Specialist to achieve 4 obj.Quantify intervention Individual Under delivery cost sand budget TF / A5636 Post Consultant Limited 29,126.00 0.00 2019-01-30 2019-02-11 2019-03-18 2019-04-22 2019-10-19 Implementation required,develop data Selection collection tools to capture all relevant costs,quantify per capita costs for patients,publish articles Page 3 PROCUREMENT PLAN (Textual Part) Project information: Liberia Recovery of Economic Activity for Liberian Informal Sector Employment Project (P174417). Project Implementation agency: Ministry of Youth and Sports (MYS) and Liberia Agency for Community Empowerment (LACE). Date of the Procurement Plan: March 12, 2021. Period covered by this Procurement Plan: March 12, 2021-June 30, 2024. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018 and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable. Works: Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable. Other Relevant Procurement Information. The project may use the CDD procurement under this project. If required, CDD procurement manual will be produced by the project. PROCUREMENT Liberia : Recovery of Economic Activity for Liberian Informal Sector Employment Project PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2021-05-27 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174417 GPN Date: Project Name: Recovery of Economic Activity for Liberian Informal Sector Employment Project Loan / Credit No: IDA / 68480 Liberia Agency for Community Empowerment Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-LACE-236726-CS-CQS / Grant Support to Vulnerable Consultant Pending Service Provider (Existing IDA / 68480 Households to Revive or Start Post Qualification Open - National 126,000.00 0.00 2021-08-05 2021-08-26 2021-10-09 2021-11-08 2021-12-13 2022-06-11 Implementation businesses) Small Businesses Selection LR-LACE-236724-CS-CQS / Grant Support to Vulnerable Consultant Pending Service Provider (New IDA / 68480 Households to Revive or Start Post Qualification Open - National 84,000.00 0.00 2022-06-06 2022-06-27 2022-08-10 2022-09-09 2022-10-14 2023-04-12 Implementation businesses) Small Businesses Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity Building and Project LR-LACE-234656-CS-CDS / Under IDA / 68480 Implementation and Post Direct Selection Direct 63,000.00 0.00 2021-06-01 2021-05-31 2021-06-11 2021-08-15 2022-12-31 Deputy Project Coordinator Implementation Coordination Capacity Building and Project Individual LR-LACE-234650-CS-INDV / Under IDA / 68480 Implementation and Post Consultant Open 36,000.00 0.00 2021-06-01 2021-05-31 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Financial Management Officer Implementation Coordination Selection Capacity Building and Project Individual LR-LACE-234652-CS-INDV / Under IDA / 68480 Implementation and Post Consultant Open 33,000.00 0.00 2021-06-01 2021-05-31 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Operations Officer Implementation Coordination Selection Capacity Building and Project Individual LR-LACE-234654-CS-INDV / Under IDA / 68480 Implementation and Post Consultant Open 33,000.00 0.00 2021-06-01 2021-05-31 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Social Safeguard Officer Implementation Coordination Selection Capacity Building and Project Individual LR-LACE-236728-CS-INDV / Pending IDA / 68480 Implementation and Post Consultant Open 18,000.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-12-31 GRM/Project Assistant Implementation Coordination Selection Page 1 Procurement Plan (Text Part) Bangladesh Insurance Sector Development Project (BISDP) Project information: (i) Country: Bangladesh (ii) Project Name: Bangladesh Insurance Sector Development Project (BISDP) (iii) P-Number: P156823 Project Implementation agency: Insurance Development and Regulatory Authority (IDRA) Period covered by this Procurement Plan: Entire Project Period 1. Preamble The Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. 2. Prior Review Thresholds Procurement Prior Review Thresholds (US$ millions) Type of Substantial High risk Moderate risk Low risk Procurement risk Works (including turnkey, supply & installation of plant 5 10 15 20 and equipment, and PPP) Goods, information technology and 1.5 2 4 6 non-consulting services Consulting services: 0.5 1 2 4 firms Consulting services: 0.2 0.3 0.4 0.5 individuals Notes: 1. These thresholds apply to all procurement activities regardless of their procurement/selection methods. There is no automatic requirement to undertake prior review for direct selection for value less than these thresholds. Consultant services covers a range of services that are of an advisory or professional nature. 2. Use of Standard Procurement Documents: For all procurements under the project, the Bank’s Standard Procurement Documents (or other documents agreed with the Bank) shall be used; 3. Request for Bids (Open-National) will be carried out under the Bank Procurement Guidelines following procedures for Open Tendering Method (OTM) of the People’s Republic of Bangladesh (Public Procurement Act, 2006 – PPA, 2006 and The Public Procurement Rules, 2008 – PPR, 2008 using standard bidding documents satisfactory to the Bank. For the purpose of Request for Bids (Open-National) the following shall apply: a. Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; b. Bids should be submitted and opened in public in one location immediately after the deadline for submission; c. Lottery in award of contracts shall not be allowed; d. Bidders’ qualification/experience requirement shall be mandatory; e. Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost and contract award shall be based on the lowest evaluated bid price of compliant bid from eligible and qualified bidder; and f. Single stage two (2) envelope procurement system shall not be allowed. 2. Prequalification. Not Applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable. 4. Reference to (if any) Project Operational/Procurement Manual: Not Applicable 5. Any Other Special Procurement Arrangements: Not Applicable. 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Any Other Special Selection Arrangements: Not Applicable. PROCUREMENT Bangladesh : Bangladesh Insurance Sector Development Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-01-09 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156823 GPN Date: 2019-04-03 Project Name: Bangladesh Insurance Sector Development Project Loan / Credit No: / , IDA / 59720 I Executing Agency(ies): nsurance Development and Regulatory Authority WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G1-1 / IT & Supporting Project Implementation, Single Stage - One / Post Request for Bids Open - National 80,000.00 52,937.96 Signed 2017-04-05 2019-02-01 2017-04-10 2017-05-01 2019-02-16 2017-05-31 2019-03-14 2017-07-12 2019-04-30 2017-10-10 Equipment : Office Equipment Management, and Monitoring Envelope Project Implementation, Single Stage - One G1-2 / Furniture & Fixture IDA / 59720 Post Request for Bids Open - National 60,000.00 12,390.56 Signed 2019-03-15 2019-04-11 2019-04-04 2019-05-24 2019-05-06 2019-06-23 2019-05-09 2019-08-04 2019-05-22 2019-11-02 Management, and Monitoring Envelope Project Implementation, Single Stage - One G1-3 / IT Equipment IDA / 59720 Post Request for Bids Open - National 100,000.00 26,521.42 Signed 2019-02-25 2019-04-10 2019-03-12 2019-05-01 2019-04-30 2019-05-31 2019-05-08 2019-07-12 2019-05-21 2019-10-10 Management, and Monitoring Envelope Improving the Capacity of the G5 / Distance learning center Insurance Development and Single Stage - One with Videoconference and IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 600,000.00 377,300.03 Signed 2020-04-11 2019-11-21 2020-05-01 2020-07-05 2019-12-17 2020-09-13 2020-01-27 2020-10-25 2020-03-02 2021-01-23 Envelope audio visual facilities and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening G2-2-1 / Supply and and Increasing the Efficiency Single Stage - One IDA / 59720 Post Request for Bids Open - National 225,000.00 231,284.43 Signed 2019-04-14 2019-04-09 2019-04-19 2019-05-10 2019-04-29 2019-05-20 2019-06-09 2019-06-24 2019-05-20 2019-08-08 installation of IT equipment of the State-owned Insurance Envelope Corporations Improving the Capacity of the Insurance Development and G3-1 / Modernization Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 500,000.00 235,182.08 Signed 2019-12-24 2019-12-12 2019-12-25 2020-01-08 2020-01-08 2020-02-10 2020-02-12 2020-03-19 2020-06-03 2020-06-15 Classroom Envelope and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development and G15 / Supply of Training Request for Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Limited 6,250.00 5,727.23 Signed 2020-01-21 2019-06-10 2020-02-14 2019-06-16 2020-02-29 Materials (Bag) Quotations Envelope and the Bangladesh Insurance Academy ( BIA) G16 / Supply and Installation Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 6,250.00 5,817.07 Signed 2020-01-26 2019-08-07 2020-02-19 2019-08-22 2020-02-22 of IT Accessories for BISDP Management, and Monitoring Quotations Envelope G18 / Supply of Computer, Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 6,000.00 5,674.26 Signed 2020-01-21 2018-10-10 2020-02-16 2018-10-17 2020-03-07 Laptop, Printer and UPS Management, and Monitoring Quotations Envelope G19 / Supply of Digital Giant Project Implementation, Request for Single Stage - One screen / LED Television, IDA / 59720 Post Limited 6,200.00 5,837.30 Signed 2020-01-24 2019-03-21 2020-02-14 2019-03-27 2020-03-15 Management, and Monitoring Quotations Envelope Camera and Accessories G20 / Supply of Photocopier Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 6,150.00 5,791.98 Signed 2020-01-26 2019-01-17 2020-02-21 2019-01-23 2020-03-27 and Tablet Management, and Monitoring Quotations Envelope G21 / Supply of Furniture and Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 6,200.00 5,871.81 Signed 2020-02-27 2019-09-10 2020-03-31 2019-09-19 2020-05-30 Fixture Management, and Monitoring Quotations Envelope Improving the Capacity of the G2-2-2 / Supply and Insurance Development and Single Stage - One Installation of Computers and IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 941,000.00 776,334.81 Signed 2020-03-16 2020-03-19 2020-03-17 2020-04-14 2020-10-11 2020-04-21 2020-06-25 2020-05-19 2020-09-29 2020-06-28 Envelope Accessories and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the G6 / Development and Insurance Development and Single Stage - One Implementation of Interactive IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 600,000.00 0.00 Canceled 2020-11-10 2020-11-28 2021-01-09 2021-04-02 2021-05-14 2021-11-10 Envelope Portal and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development and G7-1 / Online approval of Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - International 500,000.00 0.00 Canceled 2020-11-15 2020-12-16 2021-02-04 2021-05-15 2021-06-26 2022-02-21 agents Envelope and the Bangladesh Insurance Academy ( BIA) G7-2 / Certification of Project Implementation, Single Stage - One IDA / 59720 Post Request for Bids Open - International 500,000.00 0.00 Canceled 2020-12-29 2021-01-30 2021-03-25 2021-06-23 2021-08-04 2022-04-01 employers of agents & Management, and Monitoring Envelope brokers Improving the Capacity of the G10-1 / Business Intelligence Insurance Development and Single Stage - One and data analytics at IDRA & IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - International 1,600,000.00 0.00 Canceled 2020-12-07 2021-01-12 2021-03-07 2021-06-07 2021-07-19 2022-01-15 Envelope BIA and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development and G13 / Motor road accident Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 700,000.00 0.00 Canceled 2020-11-10 2020-12-02 2021-01-21 2021-03-22 2021-05-03 2021-08-31 database Envelope and the Bangladesh Insurance Academy ( BIA) Page 1 Modernization, Strengthening G8 / Core Insurance and Increasing the Efficiency Single Stage - One IDA / 59720 Prior Request for Bids Open - International 7,500,000.00 0.00 Canceled 2020-11-25 2020-12-15 2021-02-03 2021-05-04 2021-06-15 2022-02-10 applications at SBC and JBC of the State-owned Insurance Envelope Corporations Modernization, Strengthening G9-2 / Document and Increasing the Efficiency Single Stage - One Management System for SBC IDA / 59720 Prior Request for Bids Open - International 3,000,000.00 0.00 Canceled 2020-10-13 2020-11-02 2020-12-22 2021-03-22 2021-05-03 2021-10-30 of the State-owned Insurance Envelope and JBC Corporations Improving the Capacity of the G9-1 / Document Insurance Development and Single Stage - One Management System for IDRA IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 2,000,000.00 0.00 Canceled 2020-10-14 2020-11-03 2020-12-23 2021-03-23 2021-05-04 2021-10-31 Envelope & BIA and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening G14 / Call center & Customer and Increasing the Efficiency Single Stage - One Relationship Management IDA / 59720 Prior Request for Bids Open - International 4,000,000.00 0.00 Canceled 2020-12-15 2021-01-04 2021-02-23 2021-05-24 2021-07-05 2022-01-01 of the State-owned Insurance Envelope system at SBC and JBC Corporations Improving the Capacity of the Insurance Development and G12 / Centralized rating Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - International 600,000.00 0.00 Canceled 2020-11-11 2020-11-26 2021-01-15 2021-04-15 2021-05-27 2021-09-24 system Envelope and the Bangladesh Insurance Academy ( BIA) G4-2 / Basic automation Modernization, Strengthening including ERP, HRMIS and and Increasing the Efficiency Single Stage - One IDA / 59720 Prior Request for Bids Open - International 6,000,000.00 0.00 Canceled 2020-10-20 2020-11-09 2020-12-29 2021-03-29 2021-05-10 2022-05-10 Enterprise E-mail System at of the State-owned Insurance Envelope SBC and JBC Corporations Improving the Capacity of the G4-1 / Basic automation Insurance Development and including ERP, HRMIS and Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 4,000,000.00 0.00 Canceled 2020-11-30 2020-12-20 2021-02-08 2021-05-09 2021-06-20 2022-06-20 Enterprice E-mail System for Envelope and the Bangladesh Insurance IDRA & BIA Academy ( BIA) Modernization, Strengthening G10-2 / Business Intelligence and Increasing the Efficiency Single Stage - One and data analytics at SBC and IDA / 59720 Prior Request for Bids Open - International 3,000,000.00 0.00 Canceled 2020-11-18 2020-12-08 2021-01-27 2021-04-27 2021-06-08 2021-12-05 of the State-owned Insurance Envelope JBC Corporations Improving the Capacity of the Insurance Development and G11 / Fraud detection and Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - International 700,000.00 0.00 Canceled 2020-10-18 2020-11-02 2020-12-22 2021-03-22 2021-05-03 2021-08-31 prevention system Envelope and the Bangladesh Insurance Academy ( BIA) G2-1 / IT and Supporting Improving the Capacity of the Power Infrastructure (Tier 3 Insurance Development and Under Single Stage - One Data Centre & DR (Passive) for IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 6,500,000.00 0.00 Implementati 2020-10-08 2021-02-02 2020-10-23 2020-12-04 2021-01-18 2021-02-25 2021-06-25 Envelope JBC, SBC, & IDRA and BIA Mini and the Bangladesh Insurance on Data Centre) Academy ( BIA) Improving the Capacity of the G4 / Basic automation Insurance Development and including ERP, HRMIS, Intranet Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 7,647,050.00 0.00 Under Review 2021-03-20 2021-04-04 2021-05-16 2021-06-30 2021-08-11 2022-08-15 and Enterprise E-mail System Envelope and the Bangladesh Insurance for IDRA, JBC, SBC and BIA Academy ( BIA) G23 / Software Applications (Fraud detection, Centralized rating system, Motor road Improving the Capacity of the accident database, Insurance Development and Single Stage - One Development of interactive IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 9,411,764.00 0.00 Under Review 2021-06-16 2021-06-21 2021-08-02 2021-09-16 2021-10-28 2022-04-26 Envelope portal, online agent approval and the Bangladesh Insurance Certification agents , brokers, Academy ( BIA) Call centre and Business Intelligence for IDRA G24 / Supply of Air- Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,847.00 5,869.85 Signed 2021-01-24 2019-07-23 2021-01-24 2020-07-31 2021-01-24 conditioner Management, and Monitoring Quotations Envelope G-25 / Installation of Tally Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 2,415.00 2,394.58 Signed 2021-01-24 2019-12-23 2021-01-24 2019-12-29 2021-01-24 ERP Software Management, and Monitoring Quotations Envelope G-26 / Supply of Stationary Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,894.00 5,727.91 Signed 2021-01-25 2019-09-23 2021-01-25 2019-09-30 2021-01-25 and Goods Management, and Monitoring Quotations Envelope G-27 / Supply of Goods (Bag) Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,824.00 5,810.80 Signed 2021-01-25 2020-02-02 2021-01-25 2020-02-10 2021-01-25 for Training and Workshop Management, and Monitoring Quotations Envelope G-28 / Supply of Office Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,540.00 5,365.88 Signed 2021-01-26 2020-09-29 2021-01-26 2020-10-05 2021-01-26 Equipment (IT Accessories) Management, and Monitoring Quotations Envelope G-29 / Supply of Stationary & Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,882.00 5,729.63 Signed 2021-01-27 2020-09-29 2021-01-27 2020-10-05 2021-01-27 Goods Management, and Monitoring Quotations Envelope G-30 / Supply of Furniture & Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,730.00 5,637.13 Signed 2021-01-27 2020-09-29 2021-01-27 2020-10-05 2021-01-27 Fixture Management, and Monitoring Quotations Envelope G-31 / Supply of Office Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,843.00 5,843.51 Signed 2021-02-02 2020-11-12 2021-02-02 2020-11-18 2021-02-02 Equipment Management, and Monitoring Quotations Envelope Improving the Capacity of the G9 / Document management Insurance Development and Single Stage - One system for IDRA, SBC, JBC & IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 5,000,000.00 0.00 Under Review 2021-03-15 2021-03-30 2021-05-11 2021-06-25 2021-08-06 2022-02-02 Envelope BIA and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development and Pending G3-2 / Setting up Research Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Request for Bids Open - National 300,000.00 0.00 Implementati 2021-03-31 2021-04-20 2021-06-09 2021-09-07 2021-10-19 2022-02-16 Center Envelope and the Bangladesh Insurance on Academy ( BIA) Page 2 G10 / Core Insurance applications, Business Modernization, Strengthening Under Intelligence, Call center and and Increasing the Efficiency Single Stage - One IDA / 59720 Prior Request for Bids Open - International 11,176,470.00 0.00 Implementati 2021-03-15 2021-03-30 2021-05-11 2021-06-30 2021-08-11 2022-02-07 Customer Relationship of the State-owned Insurance Envelope on Management System for JBC & Corporations SBC Modernization, Strengthening G4-1-1 / Supply and Under and Increasing the Efficiency Single Stage - One Installation of Computer and IDA / 59720 Post Request for Bids Open - National 1,882,352.00 0.00 Implementati 2021-04-04 2020-12-22 2021-04-14 2021-05-12 2021-01-20 2021-06-01 2021-06-13 2021-07-13 2021-10-11 of the State-owned Insurance Envelope Accessories on Corporations G2-2 / IT & Supporting Improving the Capacity of the Network infrastructure Insurance Development and Single Stage - One Systems, Server & Storage IDA / 59720 Regulatory Authority (IDRA) Prior Request for Bids Open - International 9,500,000.00 0.00 Under Review 2021-04-13 2021-05-06 2021-05-03 2021-05-16 2021-06-22 2021-09-20 2021-11-01 2022-08-31 Envelope (Active) for JBC, SBC, BIA & and the Bangladesh Insurance IDRA Academy ( BIA) Modernization, Strengthening Pending G22 / Supply of Training and Increasing the Efficiency Single Stage - One IDA / 59720 Post Request for Bids Open - National 15,000.00 0.00 Implementati 2021-07-31 2021-08-02 2021-08-16 2021-08-21 2021-09-04 2021-10-04 Bags of the State-owned Insurance Envelope on Corporations Improving the Capacity of the Insurance Development and Pending G32 / IT Equipment for end Request for Single Stage - One IDA / 59720 Regulatory Authority (IDRA) Post Limited 17,500.00 0.00 Implementati 2021-06-15 2021-07-20 2021-08-19 user Quotations Envelope and the Bangladesh Insurance on Academy ( BIA) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G17 / Supply of Printing Project Implementation, Request for Single Stage - One IDA / 59720 Post Limited 5,937.00 3,819.70 Signed 2020-01-21 2019-09-23 2020-02-13 2019-09-30 2020-02-28 Document Management, and Monitoring Quotations Envelope CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Improving the Capacity of the Insurance Development and S4 / Sector-wide Protection Quality And Cost- / Regulatory Authority (IDRA) Post Open - International 500,000.00 603,750.00 Signed 2017-10-17 2019-03-13 2017-11-07 2019-03-21 2017-12-26 2019-07-11 2018-01-23 2019-08-25 2018-04-01 2019-11-03 2018-05-06 2019-12-02 2018-06-17 2020-01-27 2020-06-16 Gap study - Firm Based Selection and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the S5 / Awareness and Insurance Development and Quality And Cost- Insurance Literacy program - / Regulatory Authority (IDRA) Post Open - International 600,000.00 718,750.00 Signed 2018-04-18 2019-07-15 2018-05-09 2019-07-15 2018-06-30 2019-10-10 2018-07-28 2019-11-14 2018-10-03 2019-11-20 2018-11-07 2020-02-27 2018-12-19 2020-02-27 2021-12-18 Based Selection Firm and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the S2-1 / International Insurance Development and Quality And Cost- Under Regulatory and Supervisor IDA / 59720 Regulatory Authority (IDRA) Prior Open - International 2,000,000.00 0.00 2019-02-26 2019-03-09 2019-03-28 2019-04-03 2019-06-16 2019-10-17 2019-06-18 2019-12-02 2019-08-07 2020-03-15 2019-09-04 2020-10-22 2019-10-16 2022-10-15 Based Selection Implementation Expert Firm and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening S8-1 / Review of Financial and Increasing the Efficiency Quality And Cost- / Post Open - International 400,000.00 0.00 Canceled 2017-12-31 2018-01-21 2018-03-06 2018-04-03 2018-06-02 2018-07-07 2018-08-18 2020-08-07 Condition of SBC - Firm of the State-owned Insurance Based Selection Corporations Modernization, Strengthening S8-2 / Review of Financial and Increasing the Efficiency Quality And Cost- / Post Open - International 300,000.00 0.00 Canceled 2017-12-31 2018-01-21 2018-03-06 2018-04-03 2018-06-02 2018-07-07 2018-08-18 2020-08-17 Condition of JBC - Firm of the State-owned Insurance Based Selection Corporations S13-3-1 / Selection of Modernization, Strengthening International IT Consulting and Increasing the Efficiency Quality And Cost- Firm for review of IT IDA / 59720 Prior Open - International 1,000,000.00 1,025,121.70 Signed 2019-07-15 2019-07-17 2019-08-05 2019-07-29 2019-09-18 2019-12-11 2019-10-16 2020-01-15 2019-11-15 2020-07-30 2019-12-20 2020-09-28 2020-01-24 2020-10-19 2022-07-12 of the State-owned Insurance Based Selection requirements and Corporations Implementation Support Modernization, Strengthening S11 / Asset Liability and Increasing the Efficiency Quality And Cost- IDA / 59720 Prior Open - International 1,000,000.00 700,677.05 Signed 2019-07-14 2019-07-16 2019-08-04 2019-07-30 2019-09-17 2019-12-06 2019-10-15 2020-01-13 2019-12-14 2020-03-12 2020-01-18 2020-07-16 2020-02-29 2020-08-18 2022-08-31 Management Study - Firm of the State-owned Insurance Based Selection Corporations Modernization, Strengthening S7 / Review existing product and Increasing the Efficiency Quality And Cost- IDA / 59720 Post Open - International 500,000.00 0.00 Canceled 2021-01-11 2021-02-01 2021-03-17 2021-04-14 2021-07-03 2021-08-07 2021-09-18 2022-07-15 lines - Firm of the State-owned Insurance Based Selection Corporations Modernization, Strengthening S12 / Life Insurance and Increasing the Efficiency Quality And Cost- Distribution Network Expert IDA / 59720 Post Open - International 500,000.00 0.00 Canceled 2021-01-10 2021-01-31 2021-03-27 2021-04-24 2021-06-23 2021-07-28 2021-09-08 2022-07-05 of the State-owned Insurance Based Selection (Broker Agent) - Firm Corporations Improving the Capacity of the Insurance Development and S2-2 / Legal and Regulatory Quality And Cost- IDA / 59720 Regulatory Authority (IDRA) Prior Open - International 1,000,000.00 0.00 Canceled 2021-01-12 2021-02-26 2021-05-27 2021-07-16 2021-10-19 2021-11-30 2022-01-11 2022-08-09 Expert - Firm Based Selection and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening S14 / Review of existing and Increasing the Efficiency Quality And Cost- Pending product lines & Insurance IDA / 59720 Prior Open - International 1,000,000.00 0.00 2021-04-15 2021-05-06 2021-07-17 2021-08-14 2021-09-13 2021-10-18 2021-11-22 2022-08-31 of the State-owned Insurance Based Selection Implementation Distribution Network-Firm Corporations Modernization, Strengthening and Increasing the Efficiency Quality And Cost- Pending S10-1 / Acturial Firm - Firm IDA / 59720 Prior Open - International 1,000,000.00 0.00 2021-05-31 2021-06-21 2021-08-04 2021-09-01 2021-10-31 2021-12-05 2022-01-16 2022-08-31 of the State-owned Insurance Based Selection Implementation Corporations Page 3 Improving the Capacity of the Insurance Development and Consultant S15 / Selection of Client Under IDA / 59720 Regulatory Authority (IDRA) Post Qualification Open - National 100,000.00 0.00 2021-03-31 2021-05-19 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2022-08-31 Satisfaction Survey firm Implementation and the Bangladesh Insurance Selection Academy ( BIA) Consultant S16 / External Audit Firm for Project Implementation, IDA / 59720 Post Qualification Open - National 5,870.00 0.00 Under Review 2021-05-31 2021-06-13 2021-06-03 2021-06-17 2021-06-24 2021-06-30 2022-08-31 Internal Audit Management, and Monitoring Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual S1-3 / Senior Financial Project Implementation, IDA / 59720 Post Consultant Open 265,000.00 179,062.51 Signed 2019-03-04 2019-03-01 2019-04-08 2019-03-04 2019-04-29 2019-03-10 2019-06-10 2018-08-19 2022-09-22 Management Specialist Management, and Monitoring Selection Individual S1-9 / Project Associate - 4 Project Implementation, Under IDA / 59720 Post Consultant Open 210,000.00 0.00 2019-03-13 2019-02-06 2019-05-17 2019-06-07 2019-07-19 2022-12-30 Nos Management, and Monitoring Implementation Selection Individual S1-2 / Scenior Procurement Project Implementation, IDA / 59720 Post Consultant Open 240,000.00 219,953.81 Signed 2019-03-07 2018-08-23 2019-05-11 2018-11-18 2019-06-01 2019-02-12 2019-06-15 2019-02-12 2022-11-09 Specialist Management, and Monitoring Selection Individual S1-4 / Monitoring & Project Implementation, IDA / 59720 Post Consultant Open 240,000.00 198,363.59 Signed 2019-03-12 2018-07-08 2019-05-16 2019-04-09 2019-06-06 2019-04-30 2019-07-18 2019-04-30 2022-12-29 Evaluation Specialist Management, and Monitoring Selection Individual Project Implementation, S1-6 / IT Specialist IDA / 59720 Post Consultant Open 210,000.00 222,029.65 Signed 2019-03-13 2019-02-06 2019-05-17 2019-05-02 2019-06-07 2019-05-06 2019-07-19 2019-06-13 2022-12-30 Management, and Monitoring Selection Individual S1-5 / Project Management Project Implementation, IDA / 59720 Post Consultant Open 240,000.00 219,386.44 Signed 2019-03-13 2019-02-06 2019-05-17 2019-04-16 2019-06-07 2019-04-17 2019-07-19 2019-06-10 2022-12-30 Specialist- Individual Management, and Monitoring Selection Individual S1-1 / Deputy Project Project Implementation, / Prior Consultant Open 320,000.00 0.00 Canceled 2016-11-30 2017-02-03 2017-02-24 2017-04-07 2023-03-07 Director Management, and Monitoring Selection Improving the Capacity of the Insurance Development and Individual S13-1 / ERP Specialist / Regulatory Authority (IDRA) Prior Consultant Open 600,000.00 0.00 Canceled 2017-06-29 2017-10-12 2017-11-02 2017-12-14 2021-12-13 and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening Individual S13-4 / Document and Increasing the Efficiency / Post Consultant Open 200,000.00 0.00 Canceled 2018-06-28 2018-08-27 2018-09-17 2018-10-29 2020-11-27 Management Specialist of the State-owned Insurance Selection Corporations Individual S1-8 / Account Associate - Project Implementation, IDA / 59720 Post Consultant Open 240,000.00 63,437.04 Signed 2019-03-13 2019-02-06 2019-05-17 2019-04-16 2019-06-07 2019-04-17 2019-07-19 2019-06-24 2022-12-30 Individual Management, and Monitoring Selection Improving the Capacity of the Insurance Development and Individual S10-3-1 / Selection of Life IDA / 59720 Regulatory Authority (IDRA) Prior Consultant Open 420,000.00 479,484.90 Signed 2019-03-11 2019-04-03 2019-06-24 2019-08-29 2019-07-15 2019-11-16 2019-08-19 2019-11-20 2022-12-01 Insurance Actuary and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening S6-3 / Resident Adviser Individual and Increasing the Efficiency (Reinsurance/ Insurance / Prior Consultant Open 500,000.00 0.00 Canceled 2017-07-31 2017-11-03 2017-11-24 2018-01-05 2021-12-15 of the State-owned Insurance Expert) Selection Corporations Modernization, Strengthening Individual S10-3 / Life Insurance and Increasing the Efficiency IDA / 59720 Prior Consultant Open 600,000.00 0.00 Canceled 2019-02-26 2019-06-11 2019-07-02 2019-08-13 2024-08-11 Actuary of the State-owned Insurance Selection Corporations Modernization, Strengthening S13-1-1 / Selection of IT Individual and Increasing the Efficiency Specialist (Information/Cyber IDA / 59720 Post Consultant Open 180,000.00 88,663.18 Signed 2019-07-07 2019-07-08 2019-08-25 2020-07-01 2019-09-15 2020-07-01 2019-10-20 2020-08-23 2022-08-31 of the State-owned Insurance Security) Selection Corporations Modernization, Strengthening Individual S13-2 / Data Analytics and Increasing the Efficiency IDA / 59720 Prior Consultant Open 420,000.00 0.00 Canceled 2019-08-22 2019-12-15 2020-01-05 2020-02-16 2022-02-15 Specialist of the State-owned Insurance Selection Corporations Modernization, Strengthening Individual and Increasing the Efficiency S13-3 / IT Specialist for IDRA / Post Consultant Open 200,000.00 0.00 Canceled 2018-06-28 2018-08-27 2018-09-17 2018-10-29 2020-11-27 of the State-owned Insurance Selection Corporations Improving the Capacity of the S6-3-1 / Resident Adviser Insurance Development and Individual (Insurance and Reinsurance IDA / 59720 Regulatory Authority (IDRA) Post Consultant Open 270,000.00 0.00 Canceled 2019-03-11 2019-03-18 2019-06-24 2019-07-15 2019-08-19 2022-12-01 Expert) and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening S13-2-1 / Selection of IT Individual and Increasing the Efficiency Specialist (Insurance Core IDA / 59720 Post Consultant Open 180,000.00 0.00 Canceled 2019-07-22 2019-07-08 2019-09-09 2019-09-30 2019-11-04 2022-08-31 of the State-owned Insurance applications) Selection Corporations Modernization, Strengthening S6-3-2 / Resident Adviser Individual and Increasing the Efficiency (Insurance & Reinsurance IDA / 59720 Prior Consultant Limited 270,000.00 562,024.62 Signed 2020-02-24 2019-10-10 2020-02-29 2019-12-05 2020-03-07 2020-07-30 2020-03-21 2020-09-01 2022-04-10 of the State-owned Insurance Expert) Selection Corporations Page 4 Modernization, Strengthening Individual and Increasing the Efficiency S6-1 / Reinsurance Expert IDA / 59720 Post Consultant Open 250,000.00 0.00 Canceled 2020-12-22 2021-03-17 2021-04-07 2021-05-19 2022-07-13 of the State-owned Insurance Selection Corporations Improving the Capacity of the S2-3 / International Insurance Development and Individual Regulatory/ Supervisory IDA / 59720 Regulatory Authority (IDRA) Prior Consultant Open 350,000.00 0.00 Canceled 2020-12-30 2021-06-13 2021-07-04 2021-08-15 2022-08-30 Expert and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening Individual S9 / Non-Life Distribution and Increasing the Efficiency IDA / 59720 Prior Consultant Open 300,000.00 0.00 Canceled 2021-01-13 2021-04-28 2021-05-19 2021-06-30 2022-08-24 Network Expert of the State-owned Insurance Selection Corporations Individual S1-7 / Finance Associate - Project Implementation, Under IDA / 59720 Post Consultant Open 100,000.00 0.00 2021-01-13 2019-02-06 2021-03-19 2021-04-09 2021-05-21 2022-06-25 Individual Management, and Monitoring Implementation Selection Improving the Capacity of the Insurance Development and Individual S3 / Insurance Data IDA / 59720 Regulatory Authority (IDRA) Prior Consultant Open 400,000.00 0.00 Canceled 2021-01-19 2021-06-23 2021-07-14 2021-08-25 2022-08-20 Specialist/ non-life Actuary and the Bangladesh Insurance Selection Academy ( BIA) Modernization, Strengthening Individual S6-2 / Reinsurance/ and Increasing the Efficiency IDA / 59720 Post Consultant Open 296,250.00 0.00 Canceled 2020-11-18 2021-02-21 2021-03-14 2021-04-25 2022-06-19 Insurance Expert of the State-owned Insurance Selection Corporations Modernization, Strengthening Individual S10-2 / Life Insurance Expert and Increasing the Efficiency IDA / 59720 Post Consultant Open 185,000.00 0.00 Canceled 2021-01-03 2021-02-28 2021-03-21 2021-05-02 2022-05-02 - Actuary of the State-owned Insurance Selection Corporations S13-2-2 / Selection of IT Individual Project Implementation, Specialist (Insurance Core IDA / 59720 Post Consultant Limited 180,000.00 0.00 Canceled 2020-10-21 2020-10-31 2020-11-15 2020-12-13 2022-02-06 Management, and Monitoring Applications) Selection Individual S1-2-2 / Senior Procurement Project Implementation, IDA / 59720 Post Consultant Open 106,000.00 82,552.05 Signed 2021-02-15 2020-12-02 2021-04-05 2021-04-12 2021-04-26 2021-04-12 2021-05-31 2021-06-01 2022-08-31 Specialist Management, and Monitoring Selection Individual S1-2-1 / Senior Procurement Project Implementation, IDA / 59720 Post Consultant Limited 106,000.00 0.00 Canceled 2020-09-21 2020-09-26 2020-10-06 2020-11-04 2022-08-26 Specialist Management, and Monitoring Selection Page 5 PROCUREMENT PLAN Project information: Colombia Multipurpose Cadaster Project Region Project P162594 Project Implementation agency: 1. “DNP" means Departamento Nacional de Planeacion , the Borrower's National Planning Department created by Law 19 of 1958 and regulated by Decree 2996 of 1968. 2. "ANT" means Agencia Nacional de Tierras, the Borrower's National Land Agency, created by Law Decree 2363 of 2015 3. "SNR" means Superintendencia de Notariado y Registro, the Borrower's Superintendent of Notaries and Registries, created by Law Decree 3346 of 1959 and regulated by Decree 1298 of 1962. 4. "IGAC" means lnstituto Geografico Agustin Codazzi, the Geographic Institute Agustin Codazzi created by Law 14 of 1983 and regulated by Decree 283 8 of 1991. Date of the Procurement Plan: 02/07/2019 Period covered by this Procurement Plan: 02/07/2019 – 08/06/2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Multipurpose Cadaster Project PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2019-11-26 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162594 GPN Date: 2019-09-10 Project Name: Multipurpose Cadaster Project Loan / Credit No: IBRD / 89370 National Land Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-221945-GO-RFQ / Adquisición de computadores portátiles con su respectivo Implementation and Under Request for Single Stage - One morral y mouse inalámbrico IBRD / 89370 Maintenance of the Post Open - National 15,774.65 0.00 Implementati 2021-04-05 2021-05-31 2021-11-27 Quotations Envelope para la Subdirección de Multipurpose Cadastre on Planeación Operativa de la Agencia Nacional de Tierras NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-166540-NC-DIR / Implementation and Request for Single Stage - One Logistica formulación POSPR - IBRD / 89370 Maintenance of the Post Open - National 13,581.00 0.00 Canceled 2020-08-04 2020-09-29 2021-03-28 Quotations Envelope Proveer servicios logísticos Multipurpose Cadastre CO-ANT-190920-NC-RFQ / ICT Development and Request for Single Stage - One Adquisición de los servicios IBRD / 89370 Strengthening of the National Post Limited 360,937.00 415,913.41 Completed 2020-09-05 2020-10-07 2020-10-31 2020-10-14 2020-12-31 2020-12-18 Quotations Envelope de nube pública (Azure). Spatial Data Infrastructure ICT Development and CO-ANT-177691-NC-RFB / Single Stage - One IBRD / 89370 Strengthening of the National Post Request for Bids Open - National 246,824.00 0.00 Canceled 2020-08-14 2020-08-20 2020-09-17 2020-09-24 2020-10-29 2022-01-30 Fábrica de Software Envelope Spatial Data Infrastructure CO-ANT-203592-NC-RFQ / ADQUISICIÓN DE SERVICIOS ICT Development and Request for Single Stage - One PARA EL DESARROLLO DE IBRD / 89370 Strengthening of the National Post Limited 133,362.00 128,637.75 Completed 2020-11-17 2020-11-30 2020-11-20 2020-12-13 2020-11-20 2020-12-17 Quotations Envelope COMPONENTE BASADOS EN Spatial Data Infrastructure ARCGIS CO-ANT-211377-NC-RFB / ICT Development and Single Stage - One Contratación de la fábrica de IBRD / 89370 Strengthening of the National Post Request for Bids Open - National 651,239.43 641,667.85 Signed 2021-01-28 2021-01-27 2021-02-02 2021-03-16 2021-02-25 2021-04-15 2021-03-26 2021-05-20 2021-05-19 2021-12-17 Envelope software Spatial Data Infrastructure CO-ANT-230987-NC-RFB / Implementation and Pending LEVANTAMIENTO CATASTRAL Single Stage - One IBRD / 89370 Maintenance of the Prior Request for Bids Open - International 6,093,050.05 0.00 Implementati 2021-06-30 2021-09-16 2021-10-29 2021-11-23 2021-12-23 2022-11-18 ANT e IGAC + Preclasificación Envelope Multipurpose Cadastre on + FISO jurídico CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-166493-CS-QCBS / Servicio de Fábrica de Software - Gestionar el ICT Development and Quality And Cost- proceso de construcción de IBRD / 89370 Strengthening of the National Post Open - National 258,065.00 0.00 Canceled 2020-05-08 2020-05-18 2020-06-05 2020-06-19 2020-07-06 2020-08-05 2020-09-02 2020-12-31 Based Selection software encaminado a la Spatial Data Infrastructure actualización del sistema de información. CO-ANT-166491-CS-QCBS / Firma Consultora - Revisar y ajustar el modelo de atención Quality And Cost- (nacional y territorial) de la IBRD / 89370 Institutional Strengthening Post Open - National 293,976.00 0.00 Canceled 2020-06-30 2020-07-14 2020-07-21 2020-07-25 2020-07-31 2020-08-14 2020-10-06 2021-03-05 Based Selection ANT para el desarrollo de los procesos de ordenamiento social de la propiedad. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-145491-CS-INDV / Apoyo a la ANT en la planificación, seguimiento y Individual monitoreo de la ejecución del IBRD / 89370 Project Management Post Consultant Limited 54,194.00 44,315.86 Terminated 2019-11-29 2019-12-06 2019-12-06 2019-12-11 2019-12-20 2020-01-13 2020-01-13 2020-02-05 2020-12-30 préstamo (Especialista en Selection planificación, seguimiento y monitoreo) Page 1 CO-ANT-145497-CS-INDV / Apoyo a la ANT en las Individual actividades financieras IBRD / 89370 Project Management Post Consultant Limited 58,065.00 41,235.86 Terminated 2019-11-29 2019-12-06 2019-12-06 2019-12-11 2019-12-20 2020-01-13 2020-01-13 2020-02-05 2020-12-30 necesarias para la ejecución Selection del préstamo (Especialista financiero). CO-ANT-145496-CS-INDV / Apoyo a la ANT en las Individual actividades de adquisiciones IBRD / 89370 Project Management Post Consultant Limited 58,065.00 47,481.28 Terminated 2019-12-09 2019-12-09 2019-12-12 2019-12-11 2020-01-09 2020-01-13 2020-01-21 2020-02-05 2020-12-31 necesarias para la ejecución Selection del préstamo (Especialista en adquisiciones). CO-ANT-166131-CS-INDV / Implementation and Individual Especialista en Salvaguardas IBRD / 89370 Maintenance of the Post Consultant Limited 18,290.00 5,955.87 Terminated 2020-04-03 2020-04-03 2020-04-07 2020-04-17 2020-04-13 2020-05-07 2020-04-21 2020-06-01 2020-12-18 Ambientales Multipurpose Cadastre Selection CO-ANT-166423-CS-CDS / Individual Especialista en Planificación, IBRD / 89370 Project Management Post Consultant Limited 43,806.00 32,748.10 Completed 2020-04-02 2019-12-06 2020-04-02 2019-12-11 2020-04-02 2020-01-13 2020-04-02 2020-03-31 2020-12-30 2020-12-30 Seguimiento y Monitoreo Selection CO-ANT-166494-CS-INDV / ICT Development and Individual Analista de Requerimientos y IBRD / 89370 Strengthening of the National Post Consultant Open 15,742.00 8,036.57 Completed 2020-04-06 2020-05-12 2020-04-27 2020-07-07 2020-04-29 2020-07-09 2020-05-05 2020-07-24 2020-12-18 2020-12-18 Pruebas 1 Spatial Data Infrastructure Selection CO-ANT-166497-CS-INDV / ICT Development and Individual Analista de Requerimientos y IBRD / 89370 Strengthening of the National Post Consultant Open 15,742.00 8,036.57 Completed 2020-04-06 2020-05-12 2020-04-27 2020-07-09 2020-04-29 2020-07-14 2020-05-05 2020-07-24 2020-12-18 2020-12-18 Pruebas 2 Spatial Data Infrastructure Selection CO-ANT-166498-CS-INDV / ICT Development and Individual Analista de Requerimientos y IBRD / 89370 Strengthening of the National Post Consultant Open 15,742.00 8,036.57 Completed 2020-04-06 2020-05-12 2020-04-27 2020-07-07 2020-04-29 2020-07-14 2020-05-05 2020-07-24 2020-12-18 2020-12-18 Pruebas 3 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166499-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 16,935.00 8,284.69 Completed 2020-05-05 2020-05-12 2020-05-26 2020-07-24 2020-05-28 2020-08-14 2020-06-09 2020-08-14 2020-12-18 2020-12-18 Desarrollador Senior 1 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166502-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 16,935.00 8,284.69 Completed 2020-05-05 2020-05-12 2020-05-26 2020-07-24 2020-05-28 2020-08-14 2020-06-09 2020-08-14 2020-12-18 2020-12-18 Desarrollador Senior 2 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166503-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 16,935.00 6,008.29 Completed 2020-05-05 2020-05-12 2020-05-26 2020-08-13 2020-05-28 2020-08-27 2020-06-09 2020-09-17 2020-12-18 2020-12-18 Desarrollador Senior 3 Spatial Data Infrastructure Selection CO-ANT-166517-CS-INDV / ICT Development and Individual Profesional Bases de Datos IBRD / 89370 Strengthening of the National Post Consultant Open 19,355.00 9,881.03 Completed 2020-04-06 2020-05-12 2020-04-27 2020-07-09 2020-04-29 2020-07-09 2020-05-11 2020-07-24 2020-12-18 2020-12-18 Senior 2 Spatial Data Infrastructure Selection Implementation and Individual CO-ANT-166834-CS-INDV / IBRD / 89370 Maintenance of the Post Consultant Limited 14,219.00 0.00 Canceled 2020-04-08 2020-06-11 2020-04-13 2020-06-12 2020-04-16 2020-05-05 2020-12-18 Gestor Territorial 1 Multipurpose Cadastre Selection Implementation and Individual CO-ANT-166835-CS-INDV / IBRD / 89370 Maintenance of the Post Consultant Limited 11,768.00 4,277.54 Completed 2020-04-08 2020-06-11 2020-04-14 2020-06-12 2020-04-17 2020-09-11 2020-05-05 2020-09-23 2020-12-18 2020-12-18 Temático Social Transversal 2 Multipurpose Cadastre Selection CO-ANT-145510-CS-INDV / Implementation and Individual Especialista en Salvaguardas IBRD / 89370 Maintenance of the Post Consultant Limited 18,290.00 0.00 Canceled 2019-12-20 2020-03-31 2020-01-20 2020-01-31 2020-02-16 2020-12-30 Sociales Multipurpose Cadastre Selection CO-ANT-145508-CS-INDV / Apoyo a la ANT en la coordinación de gestión Individual operativa de la ejecución del IBRD / 89370 Project Management Post Consultant Limited 61,935.00 0.00 Canceled 2019-11-29 2019-12-06 2019-12-20 2020-01-13 2020-12-30 préstamo (Coordinador de Selection gestión operativa de proyecto- ANT). CO-ANT-145501-CS-INDV / Apoyo a la ANT en la gestión Individual de operaciones monetarias de IBRD / 89370 Project Management Post Consultant Limited 15,242.00 0.00 Canceled 2019-12-16 2020-01-17 2020-01-31 2020-02-16 2020-12-30 la ejecución del préstamo Selection (Profesional de tesorería). CO-ANT-145500-CS-INDV / Apoyo a la ANT en la gestión Individual contable de la ejecución del IBRD / 89370 Project Management Post Consultant Limited 15,242.00 0.00 Canceled 2019-12-16 2020-01-17 2020-01-31 2020-02-16 2020-12-30 préstamo (Profesional Selection contable). CO-ANT-166531-CS-INDV / Individual Especialista de Adquisiciones IBRD / 89370 Project Management Post Consultant Direct 44,694.00 34,762.03 Completed 2020-04-08 2020-04-14 2020-04-14 2020-04-21 2020-04-16 2020-04-22 2020-04-20 2020-05-07 2020-12-30 2020-12-30 - Bertha Lucía Cordero Otero Selection CO-ANT-174190-CS-CDS / Especialista Financiero - IBRD / 89370 Project Management Post Direct Selection Direct 32,941.00 26,475.68 Completed 2020-05-20 2020-05-20 2020-05-22 2020-05-21 2020-05-27 2020-06-01 2020-12-30 2020-12-30 Germán Jiménez Implementation and Individual CO-ANT-174397-CS-INDV / IBRD / 89370 Maintenance of the Post Consultant Limited 14,344.00 5,482.45 Completed 2020-05-21 2020-06-11 2020-05-24 2020-06-12 2020-05-26 2020-09-11 2020-06-01 2020-09-18 2020-12-18 2020-12-18 Temático Jurídico Multipurpose Cadastre Selection CO-ANT-174404-CS-INDV / Implementation and Individual Temático Ordenamiento IBRD / 89370 Maintenance of the Post Consultant Limited 13,933.00 4,559.33 Completed 2020-05-21 2020-06-11 2020-05-24 2020-06-12 2020-05-26 2020-09-25 2020-06-01 2020-10-02 2020-12-18 2020-12-18 Territorial Multipurpose Cadastre Selection CO-ANT-166532-CS-INDV / Individual Especialista Financiero - Mario IBRD / 89370 Project Management Post Consultant Direct 38,387.00 0.00 Canceled 2020-04-08 2020-04-14 2020-04-14 2020-04-22 2020-04-16 2020-04-22 2020-04-20 2020-12-30 de Milleri Bonilla Selection CO-ANT-166535-CS-INDV / Implementation and Individual Temático Catastral 1 - Juan IBRD / 89370 Maintenance of the Post Consultant Direct 14,258.00 12,349.95 Completed 2020-06-09 2020-06-09 2020-06-10 2020-06-10 2020-06-10 2020-06-10 2020-06-12 2020-06-19 2020-12-18 2020-12-18 Carlos Fajardo Multipurpose Cadastre Selection Page 2 CO-ANT-145503-CS-INDV / Apoyo a la ANT en la Implementation and Individual coordinación técnica de la IBRD / 89370 Maintenance of the Post Consultant Limited 38,387.00 0.00 Canceled 2020-06-30 2020-07-07 2020-07-21 2020-08-14 2021-08-01 ejecución del préstamo Multipurpose Cadastre Selection (Coordinador técnico del proyecto-ANT). CO-ANT-181975-CS-INDV / Individual Coordinador de Gestión IBRD / 89370 Project Management Post Consultant Direct 27,353.00 20,060.67 Completed 2020-07-31 2020-07-24 2020-08-02 2020-07-21 2020-08-03 2020-07-22 2020-08-25 2020-08-04 2020-12-30 2020-12-30 Operativa - Karen Godoy Selection CO-ANT-181974-CS-INDV / Implementation and Individual Coordinador Técnico del IBRD / 89370 Maintenance of the Post Consultant Direct 28,765.00 21,155.17 Completed 2020-07-31 2020-07-24 2020-08-02 2020-07-21 2020-08-03 2020-07-21 2020-08-25 2020-08-05 2020-12-30 2020-12-30 Proyecto - Juan Rodrigo Multipurpose Cadastre Selection Higuera CO-ANT-145510-CS-INDV-2 Implementation and Individual / Consultor Salvaguardas IBRD / 89370 Maintenance of the Post Consultant Limited 12,353.00 5,884.82 Completed 2020-07-31 2020-07-24 2020-08-31 2020-07-28 2020-09-11 2020-07-30 2020-09-27 2020-09-16 2020-12-30 2020-12-18 Sociales Multipurpose Cadastre Selection CO-ANT-177458-CS-INDV / Implementation and Individual Profesional Senior de la IBRD / 89370 Maintenance of the Post Consultant Limited 14,824.00 0.00 Canceled 2020-07-31 2020-08-05 2020-08-07 2020-08-28 2021-02-14 Dirección de Gestión Jurídica Multipurpose Cadastre Selection de Tierras CO-ANT-177456-CS-INDV / ICT Development and Individual Gestor de proyecto para el IBRD / 89370 Strengthening of the National Post Consultant Limited 14,706.00 8,832.59 Completed 2020-06-29 2020-07-24 2020-07-04 2020-08-03 2020-07-06 2020-09-10 2020-08-03 2020-09-18 2020-12-18 2020-12-30 componente tecnológico Spatial Data Infrastructure Selection CO-ANT-185312-CS-INDV / Apoyar a la ANT, como Gestor Territorial en la formulación Implementation and Individual de POSPR contribuyendo en el IBRD / 89370 Maintenance of the Post Consultant Limited 8,529.00 3,585.82 Completed 2020-07-26 2020-07-24 2020-07-27 2020-07-28 2020-08-17 2020-10-01 2020-08-29 2020-10-08 2020-12-18 2020-12-18 análisis territorial mediante el Multipurpose Cadastre Selection establecimiento de un diálogo institucional y comunitario en los municipios focalizados CO-ANT-166518-CS-INDV / ICT Development and Individual Profesional Bases de Datos IBRD / 89370 Strengthening of the National Post Consultant Open 19,355.00 0.00 Canceled 2020-04-06 2020-05-12 2020-04-27 2020-04-29 2020-05-11 2020-12-18 Senior 1 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166511-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 13,774.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-21 2020-05-28 2020-06-09 2020-12-18 Desarrollador Junior 1 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166512-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 13,774.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-21 2020-05-28 2020-06-02 2020-12-18 Desarrollador Junior 2 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166510-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 16,935.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 Desarrollador Senior 7 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166509-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 16,935.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 Desarrollador Senior 6 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166508-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 16,935.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 Desarrollador Senior 5 Spatial Data Infrastructure Selection ICT Development and Individual CO-ANT-166506-CS-INDV / IBRD / 89370 Strengthening of the National Post Consultant Open 16,935.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 Desarrollador Senior 4 Spatial Data Infrastructure Selection CO-ANT-189894-CS-INDV / Apoyar a la Agencia Nacional de Tierras (ANT) como Especialista de Salvaguardas Ambientales de las Implementation and Individual actividades previstas para los IBRD / 89370 Maintenance of the Post Consultant Direct 6,862.75 5,182.45 Completed 2020-08-24 2020-08-28 2020-08-29 2020-04-17 2020-09-04 2020-09-18 2020-09-09 2020-09-24 2020-12-18 2020-12-18 componentes y Multipurpose Cadastre Selection subcomponentes del Proyecto denominado “Programa para la adopción e implementación de un Catastro Multipropósit CO-ANT-190917-CS-INDV / ICT Development and Individual Desarrollador Senior - IBRD / 89370 Strengthening of the National Post Consultant Direct 7,941.18 5,422.20 Completed 2020-08-31 2020-09-02 2020-09-10 2020-09-28 2020-09-10 2020-09-15 2020-09-10 2020-09-25 2020-12-18 2020-12-18 Leonard Alfonso Rozo Hartley Spatial Data Infrastructure Selection CO-ANT-190919-CS-INDV / ICT Development and Individual Desarrollador Senior - Wilson IBRD / 89370 Strengthening of the National Post Consultant Direct 7,941.18 0.00 Canceled 2020-08-31 2020-09-02 2020-09-10 2020-09-10 2020-09-10 2020-12-18 Alberto Guasca Rojas Spatial Data Infrastructure Selection CO-ANT-191651-CS-INDV / ICT Development and Individual Profesional Bases de Datos IBRD / 89370 Strengthening of the National Post Consultant Direct 7,942.00 5,402.46 Completed 2020-09-10 2020-09-07 2020-09-10 2020-09-03 2020-09-15 2020-09-18 2020-09-18 2020-09-25 2020-12-18 2020-12-18 Senior - Nelson Ricardo Spatial Data Infrastructure Selection Restrepo Ramírez CO-ANT-195908-CS-INDV / Profesional Senior de la Implementation and Individual Dirección de Gestión Jurídica IBRD / 89370 Maintenance of the Post Consultant Direct 14,824.00 4,908.71 Completed 2020-09-28 2020-09-25 2020-09-29 2020-09-29 2020-09-29 2020-10-01 2020-10-01 2020-10-16 2020-12-18 2020-12-18 de Tierras - Miguel Andrés Multipurpose Cadastre Selection Martínez Toro CO-ANT-196375-CS-INDV / ICT Development and Individual Desarrolladora Senior - Rosa IBRD / 89370 Strengthening of the National Post Consultant Direct 5,736.00 3,979.67 Completed 2020-09-30 2020-09-25 2020-09-30 2020-09-25 2020-10-07 2020-10-14 2020-10-12 2020-10-29 2020-12-18 2020-12-18 Patricia García Polo Spatial Data Infrastructure Selection CO-ANT-196376-CS-INDV / ICT Development and Individual Desarrolladora Senior - Elsa IBRD / 89370 Strengthening of the National Post Consultant Direct 5,736.00 3,856.24 Completed 2020-09-30 2020-09-25 2020-09-30 2020-09-25 2020-10-07 2020-10-07 2020-10-12 2020-10-20 2020-12-18 2020-12-18 Viviana López Charry Spatial Data Infrastructure Selection CO-ANT-190918-CS-INDV / ICT Development and Individual Desarrollador Senior - William IBRD / 89370 Strengthening of the National Post Consultant Direct 7,941.18 0.00 Canceled 2020-08-31 2020-09-02 2020-09-10 2020-08-28 2020-09-10 2020-09-10 2020-12-18 Javier Barreto Parra Spatial Data Infrastructure Selection Page 3 CO-ANT-198876-CS-INDV / ICT Development and Individual Desarrollador Senior - John IBRD / 89370 Strengthening of the National Post Consultant Direct 3,530.00 2,607.37 Completed 2020-10-13 2020-10-15 2020-10-13 2020-10-16 2020-10-27 2020-10-23 2020-11-09 2020-11-11 2020-12-18 2020-12-18 Jairo Betancourt Arango Spatial Data Infrastructure Selection CO-ANT-191648-CS-INDV / ICT Development and Individual Profesional Bases de Datos IBRD / 89370 Strengthening of the National Post Consultant Direct 7,942.00 0.00 Canceled 2020-09-10 2020-09-07 2020-09-10 2020-09-15 2020-09-18 2020-12-18 Senior - John Jairo Moreno Spatial Data Infrastructure Selection Bohórquez - CO-ANT-201300-CS-INDV / ICT Development and Individual Desarrollador Junior - Miguel IBRD / 89370 Strengthening of the National Post Consultant Direct 2,871.00 0.00 Canceled 2020-10-26 2020-10-26 2020-10-27 2020-10-30 2020-11-05 2020-12-18 Antonio Posada Osorio Spatial Data Infrastructure Selection CO-ANT-177457-CS-INDV / Implementation and Individual Profesional Senior de la IBRD / 89370 Maintenance of the Post Consultant Limited 14,824.00 0.00 Canceled 2020-07-31 2020-10-26 2020-08-05 2020-08-07 2020-08-28 2021-01-26 Dirección de Acceso a Tierras Multipurpose Cadastre Selection CO-ANT-177460-CS-INDV / Implementation and Individual Profesional Senior de IBRD / 89370 Maintenance of the Post Consultant Limited 14,824.00 0.00 Canceled 2020-07-31 2020-10-26 2020-08-05 2020-08-07 2020-08-28 2021-02-14 contratos de uso de la Multipurpose Cadastre Selection Dirección de Acceso a Tierras Individual CO-ANT-145499-CS-INDV / IBRD / 89370 Project Management Post Consultant Limited 12,135.00 0.00 Canceled 2020-07-31 2020-09-16 2020-09-01 2020-09-22 2020-10-08 2021-08-21 Profesional Financiero Selection CO-ANT-210868-CS-INDV / Individual Profesional de apoyo IBRD / 89370 Project Management Post Consultant Limited 17,034.17 16,930.15 Signed 2020-12-24 2020-12-23 2021-01-20 2021-01-22 2021-02-06 2021-02-02 2021-02-16 2021-02-19 2021-12-24 financiero Selection CO-ANT-210869-CS-INDV / Implementation and Individual Profesional Senior DAT IBRD / 89370 Maintenance of the Post Consultant Limited 26,896.06 25,525.91 Signed 2020-12-24 2020-12-23 2021-01-20 2021-02-08 2021-02-06 2021-02-08 2021-02-16 2021-03-05 2021-12-24 Contratos de Uso Multipurpose Cadastre Selection CO-ANT-210870-CS-INDV / Implementation and Individual Profesional Senior DAT IBRD / 89370 Maintenance of the Post Consultant Limited 26,896.06 25,525.91 Signed 2020-12-24 2020-12-23 2021-01-20 2021-02-08 2021-02-06 2021-02-08 2021-02-16 2021-03-05 2021-12-24 Adjudicación de Baldíos Multipurpose Cadastre Selection Implementation and Individual CO-ANT-210871-CS-INDV / IBRD / 89370 Maintenance of the Post Consultant Limited 17,930.70 17,046.95 Signed 2020-12-24 2020-12-23 2021-01-20 2021-02-08 2021-02-06 2021-02-08 2021-02-16 2021-03-05 2021-12-24 Profesional Junior DAT Multipurpose Cadastre Selection CO-ANT-207581-CS-INDV / Individual Especialista Financiero del IBRD / 89370 Project Management Post Consultant Direct 46,848.08 47,968.99 Signed 2020-12-24 2020-12-23 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-12-24 Proyecto - Germán Jiménez - Selection Recontratación CO-ANT-207579-CS-INDV / Especialista Planeación Individual Monitoreo y Seguimiento - IBRD / 89370 Project Management Post Consultant Direct 46,848.08 47,968.99 Signed 2020-12-24 2020-12-23 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-12-24 Paola González - Selection Recontratación CO-ANT-207577-CS-INDV / Implementation and Individual Coordinador Técnico - Juan IBRD / 89370 Maintenance of the Post Consultant Direct 52,955.87 54,222.92 Signed 2020-12-24 2020-12-23 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-12-24 Rodrigo Higuera - Multipurpose Cadastre Selection Recontratación CO-ANT-207575-CS-INDV / Gestor de Proyecto ICT Development and Individual Fortalecimiento Tecnológico - IBRD / 89370 Strengthening of the National Post Consultant Direct 32,882.63 32,831.25 Signed 2020-12-24 2020-12-23 2021-01-18 2021-01-21 2021-01-18 2021-01-27 2021-01-24 2021-01-27 2021-12-24 Luz Adriana García Arce - Spatial Data Infrastructure Selection Recontratación CO-ANT-207583-CS-INDV / Profesional Senior de la Implementation and Individual Dirección de Gestión Jurídica IBRD / 89370 Maintenance of the Post Consultant Direct 29,768.45 29,721.94 Signed 2020-12-24 2020-12-23 2021-01-18 2021-01-27 2021-01-18 2021-01-27 2021-01-18 2021-01-27 2021-12-24 de Tierras DGJT - Miguel Multipurpose Cadastre Selection Andrés Martínez Toro - Recontratación CO-ANT-207578-CS-INDV / Individual Coordinadora de Gestión IBRD / 89370 Project Management Post Consultant Direct 51,867.51 53,108.52 Signed 2020-12-24 2020-12-23 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-12-24 Operativa - Karen Godoy Selection Caicedo - Recontratación CO-ANT-207582-CS-INDV / Individual Especialista en Adquisiciones IBRD / 89370 Project Management Post Consultant Direct 52,955.87 54,222.92 Signed 2020-12-24 2020-12-23 2021-01-18 2021-01-19 2021-01-18 2021-01-19 2021-01-18 2021-01-19 2021-12-24 - Bertha Lucía Cordero - Selection Recontratación CO-ANT-215922-CS-INDV / Temático Catastral Juan Carlos Fajardo - Recontratación 2021. Apoyar Implementation and Individual a la Agencia Nacional de IBRD / 89370 Maintenance of the Post Consultant Direct 15,983.13 15,885.53 Signed 2021-02-12 2021-02-08 2021-02-15 2021-01-25 2021-02-15 2021-02-15 2021-02-22 2021-02-19 2021-09-30 Tierras (ANT), como Temático Multipurpose Cadastre Selection Catastral, en la formulación de Planes de Ordenamiento Social de la Propiedad Rural (POSPR) CO-ANT-215929-CS-INDV / Temático Social, recontratación 2021 Diana Castro - Apoyar a la Agencia Implementation and Individual Nacional de Tierras (ANT), IBRD / 89370 Maintenance of the Post Consultant Direct 12,621.13 12,544.06 Signed 2021-02-12 2021-02-08 2021-02-15 2021-01-25 2021-02-15 2021-02-19 2021-02-22 2021-02-19 2021-09-30 como Temático Social en la Multipurpose Cadastre Selection formulación de Planes de Ordenamiento Social de la Propiedad Rural (POSPR) CO-ANT-216796-CS-INDV / Temático Jurídico CD Claudia Escorcia. Apoyar a la Agencia Implementation and Individual Nacional de Tierras (ANT), IBRD / 89370 Maintenance of the Post Consultant Direct 15,232.39 14,977.15 Signed 2021-02-12 2021-02-08 2021-02-16 2021-02-02 2021-02-16 2021-02-24 2021-02-22 2021-02-24 2021-10-06 como Temático Jurídico en la Multipurpose Cadastre Selection formulación de Planes de Ordenamiento Social de la Propiedad Rural (POSPR) Page 4 CO-ANT-217729-CS-INDV / Implementation and Individual Temático de Ordenamiento IBRD / 89370 Maintenance of the Post Consultant Limited 15,783.66 0.00 Canceled 2021-02-18 2021-02-08 2021-02-21 2021-02-23 2021-03-01 2021-10-30 Territorial Competitivo 2021 Multipurpose Cadastre Selection CO-ANT-221938-CS-INDV / Implementation and Individual Gestor territorial por IBRD / 89370 Maintenance of the Post Consultant Direct 8,747.75 8,725.69 Signed 2021-03-05 2021-03-01 2021-03-05 2021-03-03 2021-03-05 2021-03-12 2021-03-08 2021-03-12 2021-09-07 recontratación Felenix Serpa Multipurpose Cadastre Selection Implementation and Individual CO-ANT-221941-CS-INDV / IBRD / 89370 Maintenance of the Post Consultant Limited 8,747.75 8,557.07 Completed 2021-03-11 2021-03-01 2021-03-15 2021-03-03 2021-03-19 2021-03-03 2021-04-01 2021-04-09 2021-09-28 2021-05-06 Gestor Territorial Competitivo Multipurpose Cadastre Selection Implementation and Individual CO-ANT-221943-CS-INDV / IBRD / 89370 Maintenance of the Post Consultant Limited 8,747.75 8,557.07 Signed 2021-03-11 2021-03-01 2021-03-15 2021-03-03 2021-03-19 2021-03-03 2021-04-01 2021-04-09 2021-09-28 Gestor Territorial competitivo Multipurpose Cadastre Selection CO-ANT-230189-CS-INDV / Temático de Ordenamiento Implementation and Individual Territorial esta linea Under IBRD / 89370 Maintenance of the Post Consultant Limited 13,618.88 0.00 2021-04-26 2021-04-28 2021-05-03 2021-05-21 2021-05-28 2021-12-24 reemplaza la que se cancela Implementation Multipurpose Cadastre Selection por cambio de perfil en los TDR CO-ANT-230190-CS-INDV / Implementation and Individual Temático Social Competitivo IBRD / 89370 Maintenance of the Post Consultant Limited 9,680.09 9,694.81 Signed 2021-04-26 2021-04-28 2021-05-03 2021-05-10 2021-05-21 2021-05-19 2021-05-28 2021-06-01 2021-11-24 2021 Multipurpose Cadastre Selection CO-ANT-236623-CS-INDV / Implementation and Individual Auxiliar Administrativo DAT . Under IBRD / 89370 Maintenance of the Post Consultant Direct 1,854.89 0.00 2021-05-31 2021-05-31 2021-06-06 2021-06-07 2021-06-11 2021-09-09 Ivonne Alejandra López Implementation Multipurpose Cadastre Selection Asencio CO-ANT-236626-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 3,785.64 3,601.55 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-09-09 universitario 2. Juan Carlos Multipurpose Cadastre Selection García Barón CO-ANT-236628-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 3,785.64 3,601.55 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-09-09 universitario 2. Adriana Multipurpose Cadastre Selection Constanza Fajardo Aguirre CO-ANT-236629-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 2,606.89 2,480.12 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-09-09 universitario 3. Omar Jeisson Multipurpose Cadastre Selection Bravo CO-ANT-236631-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 2,606.89 2,480.12 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-09-09 universitario 3. LAURA MILENA Multipurpose Cadastre Selection AVENDAÑO BAUTISTA CO-ANT-236632-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 2,606.89 2,480.12 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-09-09 universitario 3. ORLANDO Multipurpose Cadastre Selection PEÑA MARTINEZ CO-ANT-236633-CS-INDV / Implementation and Individual Profesional jurídico Under IBRD / 89370 Maintenance of the Post Consultant Direct 2,606.89 0.00 2021-05-31 2021-05-31 2021-06-06 2021-06-07 2021-06-11 2021-09-09 universitario 3. MARTHA Implementation Multipurpose Cadastre Selection YANETH RODRIGUEZ MELO CO-ANT-236638-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 13,484.42 13,018.02 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 especializado. NELSON Multipurpose Cadastre Selection ENRIQUE DAZA LADINO CO-ANT-236640-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 13,484.42 13,018.02 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 especializado. ANTONIO Multipurpose Cadastre Selection DAVID ROYET DIAZ CO-ANT-236641-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-12-08 Universitario 1. NELSON Multipurpose Cadastre Selection VESGA TERRAZA CO-ANT-236643-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-12-08 Universitario 1. ANA DUBIEY Multipurpose Cadastre Selection MONTAÑA ROSAS CO-ANT-236645-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-12-08 Universitario 1. GINA Multipurpose Cadastre Selection MARCELA MESTRE DURAN CO-ANT-236647-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 Universitario 1. LUZ MARY Multipurpose Cadastre Selection MARTINEZ GALINDO CO-ANT-236648-CS-INDV / Implementation and Individual Profesional jurídico Under IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 0.00 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-12-08 Universitario 1. CLAUDIA Implementation Multipurpose Cadastre Selection VANESSA RENGIFO ZUÑIGA CO-ANT-236649-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 Universitario 1. LAURA Multipurpose Cadastre Selection ANGELICA BAUTISTA BARON CO-ANT-236650-CS-INDV / Implementation and Individual Profesional jurídico Under IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 0.00 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-12-08 Universitario 1. MAOMAR Implementation Multipurpose Cadastre Selection MONTES MERCADO Page 5 CO-ANT-236651-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,327.89 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 Universitario 1. MARIA TERESA Multipurpose Cadastre Selection GONZALEZ VERGARA CO-ANT-236652-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,327.89 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 Universitario 1. BRAYAN Multipurpose Cadastre Selection FELIPE RIVERA TAPIAS CO-ANT-236653-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-12-08 Universitario 1. NANCY ROCIO Multipurpose Cadastre Selection LOPEZ MESA CO-ANT-236655-CS-INDV / Implementation and Individual Profesional jurídico IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,327.89 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 Universitario 1. JESUS DAVID Multipurpose Cadastre Selection PACHECO SARMIENTO CO-ANT-236657-CS-INDV / Profesional Catastral Implementation and Individual Especializado. NUBIA IBRD / 89370 Maintenance of the Post Consultant Direct 13,484.42 13,018.02 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 ALEXANDRA BOHORQUEZ Multipurpose Cadastre Selection CASTILLO CO-ANT-236659-CS-INDV / Implementation and Individual Profesional Catastral IBRD / 89370 Maintenance of the Post Consultant Direct 13,484.42 12,828.70 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-12-08 Especializado. BRYAN FABIAN Multipurpose Cadastre Selection BONILLA SANCHEZ CO-ANT-236661-CS-INDV / Implementation and Individual Profesional Catastral IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-12-08 Universitario. NURY Multipurpose Cadastre Selection GONZALEZ AVILA CO-ANT-236663-CS-INDV / Implementation and Individual Profesional Catastral IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-18 2021-12-08 Universitario. LEIDY ANDREA Multipurpose Cadastre Selection RAMOS QUIVANO CO-ANT-236665-CS-INDV / Implementation and Individual Profesional Catastral Under IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 0.00 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-12-08 Universitario. NERY CATALINA Implementation Multipurpose Cadastre Selection VASQUEZ CASTRO CO-ANT-236669-CS-INDV / Profesional Catastral Implementation and Individual Universitario. ANDRES IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 MAURICIO ARTUNDUAGA Multipurpose Cadastre Selection SANTOS CO-ANT-236670-CS-INDV / Implementation and Individual Profesional Catastral IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 Universitario. CESAR Multipurpose Cadastre Selection AUGUSTO SANCHEZ BARRERO CO-ANT-236672-CS-INDV / Profesional Catastral Implementation and Individual Universitario. WILSON IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 OSWALDO RAMOS Multipurpose Cadastre Selection TOCARRUNCHO CO-ANT-236675-CS-INDV / Implementation and Individual Profesional Catastral IBRD / 89370 Maintenance of the Post Consultant Direct 8,626.25 8,206.77 Signed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-16 2021-12-08 Universitario. LEIDY Multipurpose Cadastre Selection KATHERINE SÁNCHEZ CO-ANT-236678-CS-INDV / Implementation and Individual Gestor Documental - JAIR Under IBRD / 89370 Maintenance of the Post Consultant Direct 5,484.75 0.00 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-12-08 ALFREDO PEÑALOZA Implementation Multipurpose Cadastre Selection PEÑALOZA CO-ANT-236681-CS-INDV / Implementation and Individual Under Auxiliar Administrativo DGJT- IBRD / 89370 Maintenance of the Post Consultant Direct 1,854.89 0.00 2021-05-31 2021-05-31 2021-06-06 2021-06-07 2021-06-11 2021-09-09 Implementation MARÍA JOSÉ DÍAZ Multipurpose Cadastre Selection CO-ANT-236682-CS-INDV / Implementation and Individual Profesional Catastral Under IBRD / 89370 Maintenance of the Post Consultant Direct 5,750.83 0.00 2021-05-31 2021-05-31 2021-06-06 2021-06-08 2021-06-07 2021-06-11 2021-10-09 Universitario. LIZ YORLENY Implementation Multipurpose Cadastre Selection RODRIGUEZ GOMEZ Individual CO-ANT-236889-CS-INDV / Under IBRD / 89370 Project Management Post Consultant Limited 10,274.25 0.00 2021-06-05 2021-05-31 2021-06-10 2021-06-20 2021-06-22 2021-12-24 Profesional de Apoyo PMS Implementation Selection CO-ANT-236894-CS-INDV / Individual Under Profesional de Apoyo en IBRD / 89370 Project Management Post Consultant Limited 10,274.25 0.00 2021-06-04 2021-06-09 2021-06-19 2021-06-22 2021-12-24 Implementation Adquisiciones Competitivo Selection CO-ANT-236899-CS-INDV / Individual Under Profesional de Apoyo IBRD / 89370 Project Management Post Consultant Limited 12,444.44 0.00 2021-06-04 2021-06-09 2021-06-19 2021-06-22 2021-12-24 Implementation Abogado GIGT Selection Page 6 REPUBLIQUE DE CENTRAFRIQUE Projet d’Amélioration des Services d’Eau et d’Electricité (PASEEL) P162245 « Numéro du crédit ou du Don » PLAN SIMPLIFIE DE PASSATION DES MARCHES (VERSION 15 JUILLET 2017) Information sur le Projet : République Centrafricaine - Projet Eau & Energie – P162245 Agence d’exécution du Projet : Sous – traitant Coordination du Projet Transit et Transit en zone CEMAC Date du plan de passation des marchés : 16 Mai 2017 Période couverte par ce plan de passation des marchés : Juin 2017 à Mai 2018 I. PRÉAMBULE Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marché se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Page 1 of 11 Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées par la Loi n°08.017 portant Code des Marchés Publics et Délégations de Service Publics en République Centrafricaine, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés : « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés : « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas pour les contrats indiqués dans les tableaux du Plan de passation des marchés. Travaux ne s’applique pas pour les contrats indiqués dans les tableaux du Plan de passation des marchés. Autres informations pertinentes sur la passation des marchés Indiquer toute autre information pertinente relative aux procédures de passation, telle que par exemple l’utilisation de procédures de participation communautaire au développement (CDD), de l’utilisation de procédures pour un besoin urgent d’assistance ou de faible capacité, etc. Page 2 of 11 II. TRAVAUX, FOURNITURES ET SERVICES NON INTELLECTUELS 1. Dispositions relatives aux seuils de revue préalable : Seuils requis pour les décisions de marchés soumis au contrôle de la passation des marchés, tel que prévu dans l’annexe II du "Règlement de Passation des pour les Emprunteurs sollicitant de la Banque mondiale le Financement de Projets d’Investissement (FPI)’’. Méthodes de Seuils de Examen par la Catégorie passation Option de marchés revue en Banque des marchés USD ≥ Tous les contrats Appel Internationale 5.000.000 d’Offres < Le premier Nationale Travaux 5.000.000 contrat Demande de Aucun Internationale/Nati cotations <200.000 onale (DC) ≥ Tous les contrats Fournitures Appel Internationale 500.000 et services d’Offres < Le premier autres que Nationale 500.000 contrat services de Demande de Internationale/Nati Aucun consultant <100.000 cotations onale 2. Seuils pour les méthodes de passation des marchés : Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : TRAVAUX (US$ équivalent) FOURNITURES (US$ équivalent) Demande Demande Appel d’offres de Appel d’offres de Cotations Cotations Internatio National International/Na Internatio National International/Nat nal tional nal ional < ≥ ≥ <500.00 5.000.00 < 200,000 < 100,000 5,000.000 500.000 0 0 3. Référence (s’il y en a) au Manuel d’exécution du projet/Manuel de Passation des Marchés : Manuel des Procédures Administrative, Financière et Comptable. 4. Autres arrangements spécifiques pour la passation des marchés : Concernant les acquisitions de véhicules et de carburant, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur de USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque ou distributeurs de produits pétroliers) ; Page 3 of 11 5. Autres modalités nationales de passation des marchés : En conformité avec le paragraphe 5.5 du "Règlement de Passation des pour les Emprunteurs sollicitant de la Banque mondiale le Financement de Projets d’Investissement (FPI)’’, les autres modalités nationales de passation des marchés (autres que sous forme d’appel d’offres/a propositions national ouvert) qui pourraient être appliquées par l’Emprunteur (appel d’offres limite/restreint, demande de prix/consultation des fournisseurs, entente directe) doivent être conformes avec les Principes Fondamentaux de passation des marchés de la Banque et garantir que les Directives de lutte contre la corruption, son cadre de sanctions et les recours contractuels vises dans l’Accord Juridique s’appliquent. Page 4 of 11 6. Liste des marchés avec les méthodes de passation et les dates de mise en œuvre Fournitures, Travaux et Services autres que services de consultants 1 2 3 4 5 6 7 8 9 Date Pré Revue de Comment Ré Méthode Préférenc prévue Coût qualific la Banque aires / Fin f. passatio e de Description estimatif ation (à priori / de No n des nationale l’ouvertu (US$) (oui/no à prestation . marchés (oui/non) re des n) posteriori) s offres Acquisition du matériel informatique pour assistant comptable, assistant en passation des A 1 50,000 DC NON NON 31/10/17 marchés, expert suivi- posteriori évaluation, expert technique, et expert environnemental et social Frais de fonctionnement et de 2 logistique jusqu’à la 50,000 DC NON NON A posteriori 31/10/17 mise en œuvre du Projet Page 5 of 11 Coût total en US$ 100,000 Page 6 of 11 III. SÉLECTION DES CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable des marchés : Décisions de sélection sujet au contrôle de la passation des marchés, tel que prévu dans l’annexe II du "Règlement de Passation des pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)’’. Seuils Méthodes de de Examen par Catégorie sélection revue la Banque en USD SFQC ; SFQ ; ≥ Tous les Services de SBCD ; SMC ; CQ 200.000 contrats Consultant (firmes) ≥ Tous les SED 100.000 contrats ≥ Tous les SED Consultants 100.000 contrats Individuels Comparaison de ≥ Tous les CVs) 200.000 contrats 2. Liste restreinte composée entièrement de firmes nationales: La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 200,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du paragraphe 7.25 du "Règlement de Passation des pour les Emprunteurs sollicitant de la Banque mondiale le Financement de Projets d’Investissement (FPI)’’. 3. Autres arrangements spécifiques pour la Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; cependant, ce seuil ne devrait pas dépasser la contre-valeur de USD 300,000 sauf dans des cas exceptionnels prévus au paragraphe 7.12 du "Règlement de Passation des pour les Emprunteurs sollicitant de la Banque mondiale le Financement de Projets d’Investissement (FPI) ". Page 7 of 11 4. Liste des Consultations, avec les méthodes de sélection et le calendrier de mise œuvre 1 2 3 4 5 6 7 Revue Date de la Coût Méthod prévue de Ref Banque Commentaires/ estimatif e de soumissio . Description des Missions (à priori Fin de ($EU) 1$ = sélectio n des No. /à prestations 600 FCFA n propositio posterio ns ri) Etude détaillée des travaux hydrauliques devant être 1 250,000 QC A priori 15/10/17 réalisées à Bangui et Berberati (SODECA) + contrôle des travaux Audit énergétique des A 2 infrastructures hydrauliques de la 50,000 CI 31/10/17 posteriori SODECA Le bureau d’études CONCEPT SA a été recruté par le Ministère dans le cadre du projet BADEA pour réaliser Etudes APS, APD et DAO pour les les études à travaux hydrauliques à réaliser 3 200,000 ED A priori 31/10/17 Bambari. Il est dans Bambari + contrôle des proposé de faire un travaux avenant au contrat de ce BE qui intervient déjà à Bambari pour un projet complémentaire. Page 8 of 11 1 2 3 4 5 6 7 Revue Date de la Coût Méthod prévue de Ref Banque Commentaires/ estimatif e de soumissio . Description des Missions (à priori Fin de ($EU) 1$ = sélectio n des No. /à prestations 600 FCFA n propositio posterio ns ri) Réalisation d’un Plan de Sécurité A 4 60,000 CI 15/10/17 du barrage de Boali posteriori Réalisation du Manuel A 5 30,000 CI 15/10/17 d’exécution du projet posteriori Réalisation des Etudes d’Impact Environnementales et Sociales (EIES), y compris les Plans de A 6 150,000 QC 31/10/17 Gestion Environnemental et posteriori Social (PGES), et les PARs – Eau et Energie, à Bambari Réalisation des Etudes d’Impact Environnementales et Sociales (EIES), y compris les Plans de A 7 130,000 QC 31/10/17 Gestion Environnemental et posteriori Social (PGES), et les PARs – Eau et Energie, à Berberati Réalisation des Etudes d’Impact Environnementales et Sociales (EIES), y compris les Plans de 8 210,000 QC A priori 31/10/17 Gestion Environnemental et Social (PGES), et les PARs – Eau et Energie à Bangui Page 9 of 11 1 2 3 4 5 6 7 Revue Date de la Coût Méthod prévue de Ref Banque Commentaires/ estimatif e de soumissio . Description des Missions (à priori Fin de ($EU) 1$ = sélectio n des No. /à prestations 600 FCFA n propositio posterio ns ri) Diagnostic opérationnel et APS des installations de génération et distribution de l’ENERCA dans six 9 230,000 QC A priori 15/11/17 villes secondaires (Berberati, Ndélé, Bria, Kaga-Bandoro, Bangassou et Sibut) Diagnostic opérationnel, APS + A 10 niveau APD/DAO et contrôle des 100,000 QC 31/10/17 posteriori travaux à Bambari, volet énergie Diagnostic opérationnel/Etat des A 11 lieux des installations de 100,000 CI 30/10/17 posteriori distribution de l’ENERCA à Bangui A 12 Elaboration du PPSD 30,000 CI 15/10/17 posteriori A 13 Audit financier du PPSD 20,000 QC 31/01/18 posteriori Recrutement d’un Assistant 14 20,000 CI A priori 15/10/17 comptable Assistant en passation des 15 20,000 CI A priori 15/10/17 marchés 16 Expert en suivi-évaluation 20,000 CI A priori 15/10/17 17 Expert environnement 20,000 CI A priori 15/10/17 Page 10 of 11 1 2 3 4 5 6 7 Revue Date de la Coût Méthod prévue de Ref Banque Commentaires/ estimatif e de soumissio . Description des Missions (à priori Fin de ($EU) 1$ = sélectio n des No. /à prestations 600 FCFA n propositio posterio ns ri) 18 Expert en développement Social 20,000 CI A priori 15/10/17 19 Expert technique énergie 20,000 CI A priori 15/10/17 20 Expert technique eau 20,000 CI A priori 15/10/17 Coût total en US$ 1,700,000 Lexique des Sigles et Abréviations AO : Appel d’Offres Ouvert SMC : Sélection au Moindre Coût DC : Demande de Cotations CI : Consultant Individuel SFQC : Sélection Fondée sur la Qualité et le Coût A posteriori : Revue à posteriori SFQ : Sélection Fondée sur la Qualité A Priori : Revue à priori QC : Sélection fondée sur les Qualifications des PPM : Plan de Passation des Marchés Consultants SED : Sélection par Entente Directe Page 11 of 11 PROCUREMENT Central African Republic : Water and Electricity Upgrading Project PLAN General Information Country: Central African Republic Bank’s Approval Date of the Original Procurement Plan: 2017-11-10 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162245 GPN Date: Project Name: Water and Electricity Upgrading Project Loan / Credit No: / , IDA / D2690, IDA / V1340 Water and Electricity Upgrading Project Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PASEEL/045/CW/RFB/19 / Berberati AEP-Travaux de réhabilitation des Under Single Stage - One 2020-05- infrastructures des IDA / D2690 Water Supply Infrastructure Post Request for Bids Open - National 972,416.12 Implementat 2019-07-25 2019-10-23 2019-07-30 2019-10-23 2019-09-10 2019-11-22 2019-10-10 2020-03-02 2019-11-14 Envelope 12 infrastructures d'alimentation ion en eau dans la ville de Berberati PASEEL/053/CW/RFB/19 / Eau Bangui-Travaux de Under réhabilitation des Single Stage - One 2020-08- IDA / D2690 Water Supply Infrastructure Post Request for Bids Open - National 0.00 Implementat 2019-11-13 2019-11-18 2019-12-30 2020-01-29 2020-03-04 infrastructures d'alimentation Envelope 31 ion en eau potable de la ville de Bangui. PASEEL/056/CW/RFB/19 / Rebobinage-Travaux de Single Stage - One 1,343,699.6 2020-09- rebobinage des alternateurs IDA / D2690 Energy Infrastructure Post Request for Bids Open - National Signed 2019-11-18 2019-12-19 2019-11-23 2020-01-04 2020-03-05 2020-02-03 2020-03-06 2020-03-09 2020-10-23 Envelope 9 05 des Groupes G2, G3, G4 et G5 de Boali 1 PASEEL/052/CW/RFB / Eau Bambari-Travaux de réhabilitation des Single Stage - One 2,028,639.2 2020-09- IDA / D2690 Water Supply Infrastructure Post Request for Bids Open - National Signed 2019-11-22 2020-01-15 2019-11-27 2020-01-08 2020-02-17 2020-02-07 2020-03-25 2020-03-13 2020-08-26 infrastructures d'alimentation Envelope 3 09 en eau potable de la ville de Bambari PASEEL/054/CW/RFB/19 / Energie de 2 villes-Travaux de réhabilitation et Single Stage - One 1,939,143.7 2020-09- d'amélioration de IDA / D2690 Energy Infrastructure Prior Request for Bids Open - National Signed 2019-12-03 2020-01-22 2019-12-08 2020-02-06 2020-01-19 2020-04-03 2020-02-18 2020-06-15 2020-03-24 2020-08-26 Envelope 5 20 l'alimentation en électricité dans les villes de Bambari et Berberati PASEEL/065/CW/RFB/20 / Centrales hybrides- Construction des ouvrages de Single Stage - One 2,365,433.3 2021-05- production de centrales IDA / D2690 Energy Infrastructure Post Request for Bids Open - International Signed 2020-07-15 2020-07-13 2020-07-20 2020-07-24 2020-08-31 2020-09-18 2020-09-30 2020-10-26 2020-11-04 2021-04-07 Envelope 5 03 hybrides (solaire PV-Diesel) dans les villes de Bambari et Berberati. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF- PASEEL-38235-GO-RFQ / Acquisition du matériel informatique pour les experts Technical Support to Water Request for Single Stage - One (Passation des Marchés, IDA / D2690 Post Limited 30,074.23 Signed 2017-12-31 2018-06-29 2018-02-25 2019-03-22 2018-08-24 and Energy Sectors Quotations Envelope Comptable, Suivi-évaluation et expert environnemental et social) PASEEL-20-IND-18 / Acquisition des moyens roulants - Achat des véhicules Under Technical Support to Water Request for Single Stage - One (2 double cabine, une berline) IDA / D2690 Post Limited 0.00 Implementati 2018-04-30 2018-04-20 2018-06-25 2018-12-22 and Energy Sectors Quotations Envelope et 10 motos pour la on supervision des activités du Projet PASEEL/O21/FOUR/DC/18 / Request for Single Stage - One Carburant-Acquisition de IDA / D2690 Water Supply Infrastructure Post Limited 101,955.32 Signed 2018-08-20 2019-07-15 2018-10-15 2019-03-15 2019-04-13 Quotations Envelope carburant pour la SODECA PASEEL/O23/FOUR/AOI/18 / Branchements sociaux- Acquisition d'équipements Single Stage - One IDA / D2690 Water Supply Infrastructure Post Request for Bids Open - International 1,180,710.11 Signed 2018-12-07 2020-02-03 2018-12-12 2019-01-23 2019-03-21 2019-02-22 2019-05-16 2019-03-29 2020-07-28 2019-09-25 d'extension et de Envelope branchements sociaux pour la SODECA. PASEEL/22/FOUR/DC/18 / Produits chimiques- Request for Single Stage - One Acquisition de consommables IDA / D2690 Water Supply Infrastructure Post Open - National 0.00 Canceled 2019-01-19 2019-03-16 2019-09-12 Quotations Envelope (produits chimiques) pour la SODECA PASEEL/033/FOUR/CF/18 / Détection fuite-Acquisition Under Request for Single Stage - One d'équipements de détection IDA / D2690 Water Supply Infrastructure Post Limited 0.00 Implementati 2019-02-04 2021-04-01 2019-04-01 2019-09-28 Quotations Envelope de fuite sur le réseau de on distribution de la SODECA PASEEL/O22/FOUR/AON/18 / Produits chimiques- Single Stage - One IDA / D2690 Water Supply Infrastructure Post Request for Bids Open - National 0.00 Canceled 2018-11-29 2018-12-04 2019-01-15 2019-02-14 2019-03-21 2019-09-17 Acquisition de consommables Envelope pour la SODECA Page 1 PASEEL/035/FOUR/DC/18 / Request for Single Stage - One Electropompes - Fourniture IDA / D2690 Water Supply Infrastructure Post Limited 0.00 Canceled 2019-01-12 2019-03-09 2019-09-05 Quotations Envelope d'électropompes à la SODECA PASEEL/038/FOUR/DIR/19 / Electropompes de captage: Contingent Emergency Fourniture d'électropompes IDA / D2690 Post Direct Selection Direct 473,708.04 Signed 2019-05-16 2019-09-07 2019-05-21 2019-09-07 2019-06-25 2019-07-15 2019-12-22 Response de captage d'eau brute à la SODECA PASEEL/040/FOUR/DIR/19 / Electropompes de refoulement - Fourniture et Contingent Emergency installation d'électropompes IDA / D2690 Post Direct Selection Direct 203,227.14 Signed 2019-05-16 2019-11-19 2019-05-21 2019-11-25 2019-06-25 2019-10-18 2019-12-22 Response de refoulement d'eau vers les réservoirs R2, R3 et R4 à la SODECA. PASEEL/022/FOUR/RFB/19 / Produits chimiques - Single Stage - One IDA / D2690 Water Supply Infrastructure Post Request for Bids Open - National 201,207.87 Signed 2019-05-27 2019-07-25 2019-06-01 2019-07-13 2019-09-03 2019-08-12 2020-02-27 2019-09-16 2019-10-16 2020-03-14 Fourniture de produits Envelope chimiques à la SODECA PASEEL/19/GO/RFB/19 / Bloc Single Stage - One de réserve-Acquisition de IDA / D2690 Energy Infrastructure Post Request for Bids Open - National 85,523.75 Signed 2019-11-05 2019-11-21 2019-11-10 2019-12-16 2019-12-22 2019-12-20 2020-01-21 2020-01-03 2020-02-25 2020-04-08 2020-08-23 Envelope Transformateurs de Puissance PASEEL/055/GO/RFQ/19 / Pending Transformateur-Acquisition Request for Single Stage - One IDA / D2690 Energy Infrastructure Post Open - International 0.00 Implementati 2019-11-05 2019-12-31 2020-06-28 de transformateurs de Quotations Envelope on courant. PASEEL/057/GO/RFQ/19 / Petits outillages-Acquisition Under de petits outillages pour les Request for Single Stage - One IDA / D2690 Water Supply Infrastructure Post Limited 0.00 Implementati 2019-11-18 2019-11-20 2020-01-13 2020-07-11 installations des Quotations Envelope on électropompes fournies à la SODECA. PASEEL/058/GO/DIR/19 / Matériels informatiques- Under Acquisition de matériels Technical Support to Water IDA / D2690 Post Direct Selection Direct 0.00 Implementati 2019-10-31 2021-01-20 2019-11-05 2019-12-10 2020-06-07 informatiques pour certains and Energy Sectors on cadres Ministériels acteurs du Projet PASSEEL/049/GO/RFB/19 / Compteurs-Acquisition de compteurs à prépaiement et Single Stage - One communicants pour IDA / D2690 Energy Infrastructure Prior Request for Bids Open - International 872,468.94 Signed 2019-11-26 2020-01-06 2019-12-01 2020-01-16 2020-01-12 2020-03-31 2020-02-11 2020-05-15 2020-03-17 2020-06-09 2020-09-13 Envelope l'amélioration des performances commerciales de l'ENERCA à BANGUI PASEEL/50/GO/RFB/19 / Remplacement cellules- Single Stage - One IDA / D2690 Energy Infrastructure Prior Request for Bids Open - National 318,725.00 Signed 2019-11-29 2019-12-27 2019-12-04 2020-04-22 2020-01-15 2020-03-06 2020-02-14 2020-04-27 2020-03-20 2020-07-09 2020-09-16 Acquisition des équipements Envelope de postes HTA/BT PASEEL/059/GO/RFQ/19 / Eléments armoires- Under Fournitures des éléments Request for Single Stage - One IDA / D2690 Water Supply Infrastructure Post Limited 0.00 Implementati 2020-01-04 2020-02-20 2020-02-29 2020-08-27 d'armoires de commande des Quotations Envelope on électropompes de refoulement d'eau. PASEEL/067/GO/DIR/21 / Acquisition du logiciel de Pending Technical Support to Water gestion financière TOM2PRO IDA / D2690 Post Direct Selection Direct 0.00 Implementati 2021-02-01 2021-02-06 2021-03-13 2021-09-09 and Energy Sectors et la formation des on utilisateurs. PASEEL/71/GO/DIR/21 / Carburant ENERCA- Pending Technical Support to Water Acquisition de carburant et IDA / D2690 Post Direct Selection Direct 0.00 Implementati 2021-04-30 2021-05-05 2021-06-09 2021-12-06 and Energy Sectors mise à disposition de on l'ENERCA et certains Hôpitaux PASEEL/072/GO/RFQ/21 / Matériels branchements- Acquisition de matériels Under Request for Single Stage - One informatiques et équipements IDA / D2690 Water Supply Infrastructure Post Limited 0.00 Implementati 2021-06-01 2021-06-01 2021-07-27 2022-01-23 Quotations Envelope de collecte pour la mise en on œuvre des branchements sociaux. PASEEL/074/GO/RFQ/21 / Equipements branchements- Under Acquisition d'outillage et Request for Single Stage - One IDA / D2690 Water Supply Infrastructure Post Limited 0.00 Implementati 2021-05-31 2021-05-31 2021-07-26 2022-01-22 d'équipements de chantier Quotations Envelope on pour la mise en œuvre des branchements sociaux PASEEL/075/GO/RFB/21 / Véhicules branchements Under sociaux-Acquisitions de Single Stage - One IDA / D2690 Water Supply Infrastructure Post Request for Bids Open - National 0.00 Implementati 2021-05-31 2021-06-03 2021-06-05 2021-06-17 2021-07-17 2021-08-16 2021-09-20 2022-03-19 matériels roulants pour la Envelope on mise en œuvre des branchements sociaux. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Page 2 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-REF-6 / Réalisation des Etudes d'Impact Environnemental et Social Consultant (EIES), y compris les Plans de Technical Support to Water / Post Qualification Open - International 0.00 Canceled 2017-11-30 2017-12-21 2018-02-03 2018-03-05 2018-04-09 2018-10-06 Gestion Environnementale et and Energy Sectors Selection Sociale (PGES) et les Plans d'Action de Réinstallation du Projet Eau et Energie à Bambari CS-REF-7 / Réalisation des Etudes d'Impact Environnemental et Social Consultant (EIES) y compris les Plans de Technical Support to Water / Post Qualification Open - International 0.00 Canceled 2017-11-30 2017-12-21 2018-02-03 2018-03-05 2018-04-09 2018-10-06 Gestion Environnementale et and Energy Sectors Selection Sociale (PGES) et les PARS du Projet eau et énergie dans la ville de Berberati CS-REF-8 / Réalisation des Consultant Technical Support to Water Under EIES, PGES et PARS - Eau et / Prior Qualification Open - International 0.00 2017-11-30 2017-12-21 2018-01-29 2018-02-03 2018-03-27 2018-03-05 2018-04-09 2018-10-06 and Energy Sectors Implementation Energie à Bangui Selection CS-REF-9 / Diagnostic opérationnel APS des installations de génération et Consultant distribution de l'ENERCA dans / Energy Infrastructure Post Qualification Open - International 0.00 Canceled 2018-01-05 2018-01-26 2018-03-11 2018-04-10 2018-05-15 2018-11-11 six villes secondaires ( Ndele, Selection Bria, Kaga-Bandoro, Bangassou et Sibut) CS-REF-10 / Diagnostic opérationnel APS, APD et DAO Consultant Under ainsi que contrôle des travaux / Energy Infrastructure Post Qualification Open - International 0.00 2018-01-10 2018-07-24 2018-01-31 2018-08-02 2018-03-16 2018-04-15 2018-05-20 2018-11-16 Implementation à Bambari et Berberati, volet Selection énergie CS-REF-12 / Audit financier Technical Support to Water Least Cost IDA / V1340 Prior Open - International 0.00 Canceled 2018-01-25 2018-02-15 2018-03-31 2018-04-28 2018-05-28 2018-07-02 2018-08-06 2019-02-02 externe du PPA and Energy Sectors Selection PASEEL/02/CS/QC/18 / Bangui-Berberati étude Consultant Under hydro/ Consultant pour étude IDA / D2690 Water Supply Infrastructure Prior Qualification Open - International 0.00 2017-12-20 2018-07-18 2018-01-10 2018-02-23 2018-11-02 2018-03-25 2018-11-27 2018-04-29 2018-10-26 Implementation détaillée et contrôle des Selection travaux hydrauliques. CS-REF-2 / Recrutement d'un consultant pour étude Consultant détaillée des travaux / Water Supply Infrastructure Prior Qualification Open - International 0.00 Canceled 2017-12-20 2018-01-10 2018-02-14 2018-02-23 2018-03-25 2018-04-29 2018-10-26 hydrauliques devant être Selection réalisées à Bangui et Berberati et contrôle des travaux PASEEL/O24/CS/QC/18 / Etudes Bambari/Berberati- Recrutement d'un Consultant/Firme chargé de la réalisation des études APS, Consultant Under APD, élaboration du DAO, IDA / D2690 Energy Infrastructure Prior Qualification Open - International 0.00 2018-08-22 2018-09-12 2018-10-26 2018-11-25 2018-12-30 2019-06-28 Implementation surveillance et contrôle des Selection travaux de réhabilitation et d'amélioration de l'alimentation en électricité à Bambari et Berberati PASEEL/28/CS/QC/18 / EIES Consultant -Berberati: EIES-PGES-PAR du Technical Support to Water Under IDA / V1340 Post Qualification Open - International 0.00 2018-01-15 2018-10-12 2018-02-05 2018-03-21 2018-04-13 2018-04-20 2018-05-25 2018-11-21 PASEEL pour la ville de and Energy Sectors Implementation Selection Berberati. PASEEL/29/SC/QC/18 / EIES Consultant BAMBARI-EIES-PGES-PAR du Technical Support to Water IDA / V1340 Post Qualification Open - International 0.00 Under Review 2018-01-15 2018-10-12 2018-02-05 2018-03-21 2018-04-20 2018-05-25 2018-11-21 PASEEL pour la ville de and Energy Sectors Selection BAMBARI. PASEEL/032/CS/SFQC/18 / Etudes dans 6 villes- Recrutement d'un consultant/Firme pour la Technical Support to Water Quality And Cost- réalisation des études IDA / D2690 Prior Open - International 0.00 Under Review 2019-02-20 2019-01-23 2019-03-13 2019-04-17 2019-04-26 2020-03-19 2019-05-24 2020-07-21 2019-06-23 2020-10-21 2019-07-28 2019-09-01 2020-08-31 and Energy Sectors Based Selection techniques de faisabilité et Avant-Projet Sommaire, volet eau et énergie dans six (6) villes secondaires de la RCA. PASEEL/031/CS/SFQC/18 / Assistance Technique- Recrutement d'un Technical Support to Water Quality And Cost- IDA / D2690 Post Open - International 0.00 Under Review 2019-02-15 2019-03-08 2019-04-21 2019-05-19 2019-06-18 2019-07-23 2019-08-27 2020-08-26 consultant/Firme pour and Energy Sectors Based Selection l'Assistance Technique à la SODECA PASEEL/035/CS/QC/19 / Electrification rurale-Politique Quality Based Under IDA / D2690 Energy Infrastructure Post Open - International 0.00 2019-03-15 2019-04-05 2021-06-01 2019-05-19 2019-06-16 2019-07-16 2019-08-15 2019-09-19 2020-09-18 d'électrification rurale et plan Selection Implementation d'investissement PASEEL/036/CS/SFQC/19 / Plan Directeur-Recrutement d'un Consultant/Firme pour l'élaboration d'un Plan Quality And Cost- Under IDA / D2690 Energy Infrastructure Post Open - International 0.00 2019-03-11 2019-04-01 2019-05-15 2019-06-12 2019-07-12 2019-08-16 2019-09-20 2020-09-19 Directeur et d'un Programme Based Selection Implementation d'Investissement pour l'électrification nationale de la République Centrafricaine CS-REF-012 / Audit-externe- Recrutement d'un Auditeur Technical Support to Water Quality And Cost- externe pour réaliser l'audit IDA / D2690 Prior Open - International 0.00 Canceled 2019-03-18 2020-11-12 2019-04-08 2019-05-22 2019-06-19 2019-07-19 2019-08-23 2019-09-27 2020-09-26 and Energy Sectors Based Selection des comptes financiers du Projet Page 3 CS-REF-0012 / Audit externe- Recrutement d'un Auditeur Technical Support to Water Quality Based externe pour réaliser l'audit IDA / D2690 Prior Open - International 0.00 Under Review 2019-04-03 2019-03-29 2019-04-24 2019-06-07 2019-04-15 2019-07-05 2019-05-20 2019-08-04 2019-09-03 2019-10-08 2020-10-07 and Energy Sectors Selection des comptes financiers du projet PASEEL/046/CS/SFQC/19 / Code d'électrification- Technical Support to Water Quality And Cost- Under Révision du Code IDA / D2690 Post Open - National 0.00 2019-08-02 2019-09-07 2019-08-23 2019-10-06 2019-11-03 2019-12-03 2020-01-07 2020-02-11 2021-02-10 and Energy Sectors Based Selection Implementation d'électrification et rédaction des décrets d'application. PASEEL/047/CS/QC/19 / Consultant Mise à jour-Mise à jour de la Technical Support to Water Under IDA / D2690 Post Qualification Open - National 0.00 2019-07-31 2019-09-13 2019-08-21 2019-09-17 2019-10-04 2019-11-03 2019-12-08 2020-06-05 stratégie du secteur and Energy Sectors Implementation Selection énergétique PASEEL/048/CS/QCBS/19 / Audit externe 19 - Recrutement d'un Consultant/Firme pour la Technical Support to Water Quality And Cost- Under IDA / D2690 Prior Open - International 0.00 2019-11-15 2019-12-16 2019-12-06 2020-03-19 2020-01-19 2020-02-16 2020-03-17 2020-04-21 2020-05-26 2021-05-26 réalisation de l'audit financier and Energy Sectors Based Selection Implementation et comptable du PASEEL et PURACEL pour l'exercice 2019, 2020 et 2021 PASEEL/069/SC/QC/21 / Recrutement d'un Consultant Consultant/Firme pour appui Technical Support to Water Under IDA / D2690 Post Qualification Limited 0.00 2021-03-25 2021-05-14 2021-04-08 2021-05-08 2021-06-12 2021-12-09 aux activités de and Energy Sectors Implementation Selection communication relatives aux branchements sociaux. PASEEL/062/CS/QCBS/20 / Audit ENERCA SODECA-Audit financier et comptable de Technical Support to Water Quality And Cost- l'ENERCA et de la SODECA et IDA / D2690 Prior Open - International 0.00 Canceled 2020-03-09 2020-11-19 2020-03-30 2020-11-23 2020-05-13 2020-06-10 2020-07-10 2020-08-14 2020-09-18 2021-09-18 and Energy Sectors Based Selection les évaluations indépendantes des exercices 2016, 2017 et 2018. PASEEL/00062/CS/LCS/20 / Audit ENERCA SODECA-Audit financier et comptable de Least Cost Under l'ENERCA et de la SODECA et IDA / D2690 Energy Infrastructure Post Open - International 0.00 2020-11-19 2020-11-19 2020-12-10 2021-01-23 2021-02-20 2021-03-22 2021-04-26 2021-05-31 2021-11-27 Selection Implementation les évaluations indépendantes des exercices 2016, 2017 et 2018. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-REF-1 / Recrutement d'un consultant chargé de Technical Support to Water Under / Prior Direct Selection Direct 0.00 2017-09-30 2018-01-23 2017-10-19 2017-10-04 2017-10-25 2017-11-24 l'élaboration du PPSD des and Energy Sectors Implementation Projets PASEEL et PURACEL CS-REF-3 / Recrutement d'un consultant pour études APS, APD et DAO des travaux / Water Supply Infrastructure Prior Direct Selection Direct 0.00 Under Review 2017-12-10 2017-12-20 2018-04-20 2018-02-23 2018-08-22 hydrauliques à réaliser et contrôle des travaux dans la ville de Bambari CS-REF-15 / Recrutement Individual Technical Support to Water d'un Expert en Suivi- IDA / V1340 Post Consultant Open 0.00 Under Review 2018-01-31 2020-09-10 2018-03-21 2018-04-11 2018-05-16 2018-11-12 and Energy Sectors évaluation Selection SGF-PASEEL-CS-INDV-16 / Individual Technical Support to Water SGF - Recrutement d'un IDA / D2690 Prior Consultant Limited 0.00 Canceled 2017-11-10 2017-11-15 2017-12-06 2018-01-10 2018-07-09 and Energy Sectors comptable du Projet PASEEL Selection PASEEL-CS-INDV-15 / EPM- Individual PASEEL-Recrutement d'un Technical Support to Water IDA / D2690 Prior Consultant Limited 3,160.64 Signed 2017-11-12 2017-11-17 2017-12-08 2018-05-05 2018-01-12 2018-05-14 2018-07-11 Expert en Passation des and Energy Sectors Selection Marchés CS-REF-13 / Recrutement Individual Technical Support to Water Under d'un comptable, responsable IDA / V1340 Prior Consultant Limited 0.00 2018-01-25 2018-01-30 2018-02-20 2018-03-21 2018-03-27 2018-09-23 and Energy Sectors Implementation de gestion fiduciaire du projet Selection PASEEL-18-IND-18 / Expert Environnement-Recrutement Individual Technical Support to Water Under d'un consultant, expert en IDA / D2690 Post Consultant Limited 0.00 2018-05-15 2017-10-04 2018-05-20 2020-10-27 2018-06-10 2018-04-13 2018-07-15 2019-01-11 and Energy Sectors Implementation sauvegarde environnementale Selection du Projet PASEEL. PASEEL-19-IND-18 / Expert sociale - Recrutement d'un Individual Technical Support to Water consultant individuel, expert IDA / D2690 Post Consultant Limited 0.00 Canceled 2018-05-10 2018-05-15 2018-06-05 2018-07-10 2019-01-06 and Energy Sectors en sauvegarde sociale du Selection Projet PASEEL/O25/CS/IND/18 / Résilience Boali-Recrutement d'un consultant chargé de la rédaction des spécifications Individual Under techniques pour la fourniture IDA / D2690 Energy Infrastructure Post Consultant Open 0.00 2018-09-05 2020-02-15 2018-10-24 2019-03-05 2018-11-14 2020-03-07 2018-12-19 2019-06-17 Implementation et installation des Selection équipements de la sous- composante "Résilience de Boali". Page 4 PASEEL/O26/CS/IND/18 / Compteurs prépaiement- Recrutement d'un consultant chargé de la rédaction des Individual spécifications techniques des IDA / D2690 Energy Infrastructure Post Consultant Open 32,300.00 Signed 2018-09-13 2018-08-28 2018-11-01 2019-03-12 2018-11-22 2019-03-20 2018-12-27 2019-03-21 2019-06-25 compteurs à prépaiement et Selection communiquant pour l'amélioration des performances commerciales de l'ENERCA à Bangui. PASEEL/030/CS/IND/18 / Audit énergétique- Recrutement d'un consultant Individual individuel pour la réalisation IDA / D2690 Water Supply Infrastructure Post Consultant Open 54,236.70 Signed 2018-11-15 2018-08-28 2019-01-03 2019-09-02 2019-01-24 2019-09-02 2019-02-28 2019-10-23 2019-08-27 de l'audit énergétique des Selection infrastructures hydrauliques de la SODECA. PASEEL-0019-IND-18 / Individual Expert Social-Recrutement Technical Support to Water IDA / D2690 Post Consultant Open 0.00 Under Review 2018-06-03 2020-02-28 2018-07-22 2018-08-12 2018-09-16 2019-03-15 d'un Expert en sauvegardes and Energy Sectors Selection sociales PASEEL/034/CS/CDS/18 / Paramétrage Tompro- Individual Technical Support to Water Under Recrutement d'un consultant IDA / D2690 Post Consultant Direct 23,580.49 2018-11-19 2018-12-19 2018-11-29 2019-04-11 2018-12-20 2019-04-16 2019-01-24 2019-07-23 and Energy Sectors Implementation individuel pour le Selection paramétrage des projets sur Tompro. CS-REF-11 / Diagnostic opérationnel/Etat des lieux Individual Pending des installations de IDA / D2690 Energy Infrastructure Post Consultant Open 0.00 2019-02-28 2019-04-18 2019-05-09 2019-06-13 2019-12-10 Implementation distribution de l'ENERCA à Selection Bangui CS-REF-5 / Etude de Individual Pending réalisation d'un plan de IDA / D2690 Energy Infrastructure Post Consultant Limited 0.00 2019-03-15 2019-03-20 2019-04-10 2020-07-03 2020-12-30 Implementation sécurité du barrage de Boali Selection PASEEL/037/SC/SED/19 / Contrat Comptable- Technical Support to Water Renouvellement de contrat du IDA / D2690 Prior Direct Selection Direct 1,712.76 Signed 2019-04-16 2019-05-08 2019-04-26 2019-06-30 2019-05-10 2019-12-27 and Energy Sectors Comptable du PASEEL et du PURACEL PASEEL/043/CS/ED/19 / Renouvellement du contrat de Technical Support to Water Under l'Expert en Passation des IDA / D2690 Post Direct Selection Direct 0.00 2019-05-15 2019-05-29 2019-05-25 2019-07-29 2020-01-25 and Energy Sectors Implementation Marchés des Projets PASEEL et PURACEL PASEEL/044/CS/INDV/19 / SIG-Recrutement d'un consultant individuel chargé Individual Technical Support to Water Under de réaliser les études pour la IDA / D2690 Post Consultant Open 0.00 2019-06-13 2019-07-19 2019-08-01 2019-08-22 2019-09-26 2020-03-24 and Energy Sectors Implementation mise en place d'u système Selection d'information géographique de la SODECA PASEEL/060/CS/INDV/19 / Expert Social-Renouvellement Technical Support to Water IDA / D2690 Post Direct Selection Direct 19,825.08 Signed 2019-12-30 2020-01-07 2020-01-09 2020-01-17 2020-03-14 2020-01-16 2020-09-10 du contrat de l'Expert en and Energy Sectors Sauvegardes Sociales PASEEL/061/CS/INDV/19 / Expert environnement- Technical Support to Water Renouvellement du contrat de IDA / D2690 Post Direct Selection Direct 28,071.11 Signed 2020-01-08 2020-01-16 2020-01-18 2020-02-28 2020-03-23 2020-05-05 2020-09-19 and Energy Sectors l'Expert en Sauvegardes Environnementales PASEEL/063/CS/INDV/20 / Comptable-Renouvellement Technical Support to Water Under IDA / D2690 Post Direct Selection Direct 0.00 2020-03-10 2020-04-17 2020-03-20 2020-05-24 2020-11-20 du contrat du Comptable and Energy Sectors Implementation PASEEL/PURACEL PASSEL/064/CS/INDV/20 / SPM Renouvellement- Technical Support to Water Renouvellement du contrat du IDA / D2690 Post Direct Selection Direct 0.00 Under Review 2020-06-15 2020-06-29 2020-06-25 2020-08-29 2021-02-25 and Energy Sectors Spécialiste en Passation des Marchés PASEEL/066/CS/IND/20 / Individual Social-Renouvellement du Technical Support to Water IDA / D2690 Post Consultant Direct 29,047.36 Signed 2020-09-30 2020-09-16 2020-10-10 2020-09-04 2020-10-31 2020-12-04 2020-12-05 2020-12-09 2021-06-03 Contrat de l'Expert en and Energy Sectors Selection Sauvegardes Sociales PASEEL/067/CS/INDV/20 / Relecture-Recrutement d'un Individual Consultant individuel chargé Technical Support to Water IDA / D2690 Post Consultant Direct 0.00 Canceled 2020-10-21 2020-10-22 2020-10-31 2020-11-21 2020-12-26 2021-06-24 de la relecture et finalisation and Energy Sectors Selection des rapports EIES des villes de Bambari et Berberati. PASEEL/068/CS/INDV/21 / Individual Avenant 3-Renouvellement du Technical Support to Water Under IDA / D2690 Post Consultant Direct 0.00 2021-02-16 2021-04-01 2021-02-26 2021-05-27 2021-03-19 2021-06-09 2021-04-23 2021-10-20 Contrat du Comptable du and Energy Sectors Implementation Selection PASEEL/PURACEL PASEEL/069/CS/INDV/21 / Avenant 2- renouvellement du Individual Technical Support to Water Under Contrat de l'Expert en IDA / D2690 Post Consultant Direct 0.00 2021-02-18 2021-03-01 2021-02-28 2021-05-27 2021-03-21 2021-06-10 2021-04-25 2021-10-22 and Energy Sectors Implementation Sauvegardes Selection Environnementales. PASEEL/073/CS/DIR/21 / Avenant3 SPM- Renouvellement du contrat du Technical Support to Water IDA / D2690 Post Direct Selection Direct 0.00 Under Review 2021-05-31 2021-06-14 2021-06-10 2021-08-14 2022-02-10 Spécialiste en Passation des and Energy Sectors Marchés second du PURACEL/PASEEL Page 5 PASEEL/076/CS/INDV/21 / Evaluation mi parcours- Recrutement d'un Consultant Individual Individuel chargé de Technical Support to Water Pending IDA / D2690 Post Consultant Limited 0.00 2021-06-21 2021-06-26 2021-07-17 2021-08-21 2022-02-17 l'évaluation à mi parcours du and Energy Sectors Implementation Selection Projet d'Amélioration des Services d'Eau et d'Electricité (PASEEL). Page 6 PROCUREMENT PLAN (Textual Part) Project information: BZ Climate Resilient Infrast. (P127338) Implementing Entity: Social Investment Fund Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT Belize : Climate Resilient Infrastructure PLAN General Information Country: Belize Bank’s Approval Date of the Original Procurement Plan: 2018-07-10 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P127338 GPN Date: Project Name: Climate Resilient Infrastructure Loan / Credit No: IBRD / 84160 SOCIAL INVESTMENT FUND Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BZ-SIF-63423-CW-RFB / W1A - Rehabilitation of Pavement Failure between Climate Resilient Single Stage - One 2020-04- IBRD / 84160 Prior Request for Bids Open - International 5,000,000.00 0.00 Canceled 2018-10-05 2018-10-15 2018-11-26 2018-12-26 2019-02-06 Ladyville and Burrell Boom Infrastructure Envelope 01 Junction on Philip Goldson Highway - Lot A BZ-SIF-63424-CW-RFB / W1B -Rehabilitation of Pavement Failure between Burrell Boom Climate Resilient Single Stage - One 10,000,000.0 2020-04- IBRD / 84160 Prior Request for Bids Open - International 0.00 Canceled 2018-10-05 2018-10-15 2018-11-26 2018-12-26 2019-02-06 Junction and Mile 24.5 on Infrastructure Envelope 0 01 Philip Goldson Highway - Lot B BZ-SIF-156539-CW-RFB / W1A/W1B Rehabilitation of the Philip Goldson Highway Climate Resilient Single Stage - One 16,150,000.0 2022-03- IBRD / 84160 Prior Request for Bids Open - International 0.00 Canceled 2020-02-11 2020-03-05 2020-02-27 2020-03-06 2020-04-27 2020-05-25 2020-07-21 (Miles 8.25 to 19.25) and the Infrastructure Envelope 0 04 Mexico Creek Bridge at Mile 20.8, Belize District, Belize GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BZ-SIF-62409-GO-RFB / Technical Assistance for Single Stage - One G7B(1) Excavators for Ministry IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 300,000.00 406,366.44 Completed 2018-05-11 2018-05-12 2018-05-13 2018-05-10 2018-05-31 2018-06-06 2018-07-05 2018-06-27 2019-01-01 2019-01-07 Envelope of Works Management BZ-SIF-62412-GO-RFB / G12 Technical Assistance for Single Stage - One Vehicles for MNR (2) and CRIP IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 135,000.00 125,862.69 Completed 2018-05-31 2018-06-05 2018-07-05 2018-07-13 2018-07-20 2018-08-02 2018-08-24 2018-08-30 2018-10-08 2018-10-05 Envelope PMU (1) Management BZ-SIF-63425-GO-RFB / G8B Technical Assistance for Single Stage - One - Provide specialized software IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 150,000.00 0.00 Canceled 2018-07-27 2018-08-27 2018-08-01 2018-09-12 2018-10-03 2018-10-31 2019-02-28 Envelope & Training - LIC in MNR Management BZ-SIF-63426-GO-RFB / G9 Technical Assistance for - Provide specialized Single Stage - One IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 157,500.00 0.00 Canceled 2018-07-27 2018-08-27 2018-08-01 2018-09-12 2018-10-03 2018-10-31 2019-02-28 Hardware/ software & Envelope Management Training - PPU in MNR BZ-SIF-64438-GO-RFB / G7A(1): Supply and delivery of Technical Assistance for one (1) aluminum work boat Single Stage - One IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 300,000.00 0.00 Canceled 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2019-02-17 and one (1) trailer to Envelope Management accommodate work boat for MOW BZ-SIF-64531-GO-RFB / G6: Technical equipment, including engineering test Technical Assistance for Single Stage - One and field equipment, multiple IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 130,000.00 0.00 Canceled 2018-07-01 2018-08-21 2018-07-06 2019-02-08 2018-08-17 2019-03-14 2018-09-16 2019-07-23 2018-10-14 2019-01-12 Envelope equipment purchases of Management various types package I - RMU MOW BZ-SIF-69095-GO-RFQ / G14: Supply and delivery of Technical Assistance for computers and printers for Request for Single Stage - One IBRD / 84160 Improved Climate Resilience Post Open - National 17,500.00 18,459.46 Completed 2018-08-20 2018-09-27 2018-11-12 2018-10-18 2019-02-18 proper use and functioning of Quotations Envelope Management Soils Lab Equipment and Survey Equipment for MOW BZ-SIF-104472-GO-RFB / Technical Assistance for Single Stage - One G8B IT and Field Equipment IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 216,475.96 153,120.98 Signed 2019-03-05 2019-03-06 2019-03-06 2019-04-08 2019-04-08 2019-04-29 2019-04-29 2019-05-27 2019-05-23 2019-07-11 2019-12-02 Envelope for MNR Management BZ-SIF-104476-GO-RFB / G9 Technical Assistance for Single Stage - One Drone with application IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 120,000.00 0.00 Canceled 2019-03-30 2019-04-04 2019-05-16 2019-06-06 2019-07-04 2019-11-01 Envelope software Management BZ-SIF-163172-GO-RFB / G6(A2-i): Bathymetric Equipment - Self-Contain Technical Assistance for Single Stage - One Acoustic Doppler Current IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 65,000.00 0.00 Canceled 2020-03-31 2020-04-05 2020-05-17 2020-06-16 2020-07-21 2021-01-17 Envelope Profiler – 1 set - for Supply, Management Delivery and Training on use of Equipment BZ-SIF-64432-GO-RFB / G10B Provide specialize Technical Assistance for Single Stage - One software - MOW (RMU MIS) IBRD / 84160 Improved Climate Resilience Post Request for Bids Open - National 300,000.00 0.00 Canceled 2018-06-15 2018-10-22 2018-06-18 2018-07-30 2018-08-20 2018-09-13 2018-12-12 Envelope (Supply, deliver, Install & Management training on use of software) BZ-SIF-190257-GO-RFQ / CERC MOFAI GO-01: Supply Contingent Emergency Request for Single Stage - One and delivery of disposable IBRD / 84160 Post Limited 215,000.00 122,662.10 Signed 2020-09-04 2020-09-16 2020-09-29 2020-10-21 2020-11-13 Response Quotations Envelope non-surgical face masks for general use Page 1 BZ-SIF-190258-GO-RFQ / CERC MOFAI GO-03: Supply Contingent Emergency Request for Single Stage - One IBRD / 84160 Post Limited 168,600.00 66,107.46 Signed 2020-09-06 2020-12-03 2020-10-01 2021-02-16 2020-12-30 and delivery of plastic high Response Quotations Envelope density polyethylene crates BZ-SIF-190261-GO-RFQ / CERC MOFAI GO-04: Supply Contingent Emergency Request for Single Stage - One IBRD / 84160 Post Limited 4,000.00 3,403.28 Signed 2020-09-09 2020-12-04 2020-10-04 2021-02-11 2020-12-03 and delivery of heavy duty Response Quotations Envelope folding weighing scales BZ-SIF-190263-GO-RFQ / CERC MOFAI GO-07: Supply Contingent Emergency Request for Single Stage - One IBRD / 84160 Post Limited 5,655.00 5,258.72 Signed 2020-09-11 2020-09-29 2020-10-06 2020-11-16 2020-11-20 and delivery of one only heavy Response Quotations Envelope duty printer BZ-SIF-190264-GO-RFQ / CERC MOFAI GO-08: Supply Contingent Emergency Request for Single Stage - One IBRD / 84160 Post Limited 12,050.00 14,879.09 Signed 2020-09-09 2020-09-29 2020-10-04 2021-01-22 2020-11-18 and delivery of laptops and Response Quotations Envelope scanners BZ-SIF-190265-GO-RFQ / CERC MOFAI GO-09: Supply Contingent Emergency Request for Single Stage - One and delivery of executive IBRD / 84160 Post Limited 4,900.00 2,899.73 Signed 2020-09-12 2020-10-07 2020-10-07 2020-11-16 2020-11-21 Response Quotations Envelope chairs and lockable metal filing cabinets BZ-SIF-190266-GO-RFQ / CERC MOFAI GO-11: Supply Contingent Emergency Request for Single Stage - One IBRD / 84160 Post Limited 7,650.00 11,031.15 Signed 2020-09-13 2020-10-07 2020-10-08 2021-01-20 2020-11-22 and delivery of heavy duty Response Quotations Envelope tents and folding chairs BZ-SIF-190270-GO-DIR / CERC MOFAI GO-02: Supply Contingent Emergency IBRD / 84160 Post Direct Selection Direct 68,000.00 51,594.98 Signed 2020-09-04 2020-11-06 2020-09-09 2020-11-06 2020-09-28 2021-02-02 2020-11-27 and delivery of alcohol based Response hand rubs (sanitizers) BZ-SIF-190271-GO-DIR / CERC MOFAI GO-05: Supply Contingent Emergency and delivery of vegetable IBRD / 84160 Post Direct Selection Direct 23,000.00 22,156.92 Signed 2020-09-14 2020-09-18 2020-09-19 2020-12-07 2020-10-08 2021-01-29 2020-12-07 Response wash tubs with troughs and drain baskets BZ-SIF-190272-GO-DIR / CERC MOFAI GO-06: Supply Contingent Emergency IBRD / 84160 Post Direct Selection Direct 10,000.00 9,922.11 Signed 2020-09-21 2020-09-18 2020-09-26 2021-02-02 2020-10-29 2021-03-11 2021-02-26 and delivery of movable Response vegetable grading equipment BZ-SIF-190273-GO-DIR / CERC MOFAI GO-10: Supply and delivery of wooden desks Contingent Emergency IBRD / 84160 Post Direct Selection Direct 3,500.00 3,234.86 Signed 2020-09-01 2020-09-01 2020-09-06 2020-09-11 2020-09-25 2020-10-06 2020-10-25 on metal frame with water Response resistant surface and covid19 protective shield NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BZ-SIF-63427-CS-CQS / C20 Technical Assistance for Consultant - Training to build capacity at IBRD / 84160 Improved Climate Resilience Post Qualification Open - National 50,000.00 0.00 Canceled 2018-07-02 2018-07-16 2018-08-29 2018-09-28 2018-11-02 2019-01-31 MNR and NSDI stake holders Management Selection BZ-SIF-82586-CS-QCBS / C14: Consultant to provide detailed design services for Climate Resilient Quality And Cost- the rehabilitation of Vista Del IBRD / 84160 Prior Open - International 1,089,572.00 712,500.00 Signed 2018-10-17 2018-10-22 2018-11-07 2018-10-22 2018-11-28 2018-12-03 2019-01-12 2019-01-25 2019-01-26 2019-02-26 2019-03-02 2019-04-11 2019-03-26 2019-04-25 2019-10-22 Infrastructure Based Selection Mar Junction and Miles 8.5 to 24.5 of the Philip Goldson Highway, Belize BZ-SIF-123787-CS-QCBS / C15: Consultancy services for Supervision of rehabilitation Climate Resilient Quality And Cost- of Vista Del Mar Junction and IBRD / 84160 Prior Open - International 2,082,376.57 0.00 Canceled 2019-07-22 2019-07-30 2019-08-22 2019-08-01 2019-09-16 2020-03-09 2019-10-21 2019-11-07 2019-12-30 2020-01-30 2022-11-30 Infrastructure Based Selection Miles 8.5 to 24.5 of the Philip Goldson Highway, Belize District, Belize BZ-SIF-215951-CS-LCS / Independent audit of the Social Investment Fund for Project Management and Least Cost IBRD / 84160 Post Open - National 20,000.00 73,671.68 Signed 2021-01-29 2021-02-03 2021-02-19 2021-02-12 2021-04-04 2021-03-24 2021-05-02 2021-04-26 2021-05-12 2021-05-21 2021-05-21 2021-06-02 2021-05-31 2021-06-10 2023-07-31 fiscal years April 1 to March Implementation Support Selection 31 for 2020/2021, 2021/2022, and 2022/2023 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BZ-SIF-67608-CS-INDV / Technical Assistance for Individual C21: Consultancy to provide IBRD / 84160 Improved Climate Resilience Post Consultant Open 120,000.00 0.00 Canceled 2018-07-16 2018-08-21 2018-09-05 2018-09-20 2018-10-19 2019-04-17 technical assistance for Management Selection certification of - MOW LAB BZ-SIF-67613-CS-INDV / Individual Project Management and C27(1) Renewal: Senior IBRD / 84160 Post Consultant Direct 45,000.00 21,431.76 Completed 2018-08-30 2018-09-01 2018-09-03 2018-08-28 2018-09-06 2018-09-06 2019-08-31 2019-08-31 Implementation Support Accounts Officer Selection Page 2 BZ-SIF-67609-CS-INDV / C21A: Consultancy to provide Technical Assistance for Individual technical assistance for IBRD / 84160 Improved Climate Resilience Post Consultant Open 74,000.00 0.00 Canceled 2018-07-16 2018-09-05 2018-09-20 2018-10-19 2019-04-17 training certification of Soils Management Selection Technician - MOW LAB BZ-SIF-110921-CS-INDV / Individual Project Management and C1-1: CRIP Project IBRD / 84160 Post Consultant Direct 19,537.12 19,348.12 Completed 2019-04-16 2019-04-16 2019-04-16 2019-04-16 2019-04-16 2019-04-16 2019-04-16 2019-04-16 2019-08-31 2019-08-31 Implementation Support Coordinator Selection BZ-SIF-123809-CS-CDS / Project Management and C27 (1-2) Project Staff - IBRD / 84160 Post Direct Selection Direct 21,642.00 21,431.76 Signed 2019-07-19 2019-07-19 2019-07-19 2019-07-19 2019-08-31 2019-08-27 2020-08-30 Implementation Support Senior accounts officer BZ-SIF-123810-CS-CDS / C25 (1): Project Staff: Social / Project Management and IBRD / 84160 Post Direct Selection Direct 30,300.00 30,004.46 Signed 2019-07-19 2019-07-19 2019-07-19 2019-07-19 2019-07-31 2019-08-27 2020-07-30 Monitoring & Evaluation Implementation Support Officer BZ-SIF-123811-CS-CDS / Project Management and C12b(i-1) Project Staff - IBRD / 84160 Post Direct Selection Direct 32,500.00 32,147.64 Signed 2019-07-19 2019-07-19 2019-07-19 2019-07-19 2019-08-31 2019-08-27 2020-08-30 Implementation Support Procurement Officer BZ-SIF-123812-CS-CDS / Project Management and C12A(i-1): Project Staff - IBRD / 84160 Post Direct Selection Direct 43,300.00 42,863.52 Signed 2019-07-19 2019-07-19 2019-07-19 2019-07-19 2019-08-31 2019-08-27 2020-08-30 Implementation Support Project Engineer I BZ-SIF-123813-CS-CDS / Project Management and C26 (1-1): Project Staff - IBRD / 84160 Post Direct Selection Direct 42,080.00 41,672.87 Signed 2019-07-19 2019-07-19 2019-07-19 2019-07-19 2019-08-31 2019-08-27 2020-08-30 Implementation Support Project Engineer II BZ-SIF-123814-CS-CDS / C1- Project Management and 1(1): Project Staff - Project IBRD / 84160 Post Direct Selection Direct 43,300.00 46,711.88 Signed 2019-07-19 2019-07-19 2019-07-19 2019-07-19 2019-08-31 2019-08-27 2020-08-30 Implementation Support Coordinator BZ-SIF-123815-CS-CDS / C1- Project Management and 2(1): Project Staff - IBRD / 84160 Post Direct Selection Direct 11,900.00 11,787.47 Signed 2019-07-19 2019-07-19 2019-07-19 2019-07-19 2019-08-31 2019-08-27 2020-08-30 Implementation Support Administrative Assistant BZ-SIF-124808-CS-CDS / Technical Assistance for C19(A-1) Spatial Data IBRD / 84160 Improved Climate Resilience Post Direct Selection Direct 31,260.00 30,956.99 Completed 2019-07-25 2019-07-25 2019-07-25 2019-07-25 2019-07-31 2019-08-27 2020-07-23 2020-07-23 Administrator for Ministry of Management Natural Resources Individual BZ-SIF-186320-CS-CDS / Project Management and IBRD / 84160 Post Consultant Direct 43,200.00 39,291.56 Signed 2020-07-29 2020-08-01 2020-07-29 2020-06-30 2020-08-04 2020-09-11 2020-09-01 2020-10-28 2021-08-31 CRIP Project Coordinator Implementation Support Selection BZ-SIF-186337-CS-CDS / Individual Project Management and CRIP Social/ Monitoring and IBRD / 84160 Post Consultant Direct 30,240.00 32,504.84 Signed 2020-07-29 2020-07-29 2020-07-29 2020-07-29 2020-07-29 2020-07-31 2020-08-14 2020-08-27 2021-07-30 Implementation Support Evaluation Officer Selection Individual BZ-SIF-186354-CS-CDS / Project Management and IBRD / 84160 Post Consultant Direct 21,600.00 19,645.78 Signed 2020-07-29 2020-07-21 2020-07-29 2020-06-30 2020-08-04 2020-07-31 2020-09-01 2020-08-28 2021-08-31 CRIP Senior Accounts Officer Implementation Support Selection Individual BZ-SIF-186360-CS-CDS / Project Management and IBRD / 84160 Post Consultant Direct 11,880.00 10,805.18 Signed 2020-07-29 2020-08-02 2020-07-29 2020-06-30 2020-08-04 2020-08-28 2020-09-01 2020-09-17 2021-08-31 CRIP Administrative Assistant Implementation Support Selection Individual BZ-SIF-186362-CS-CDS / Project Management and IBRD / 84160 Post Consultant Direct 32,400.00 29,468.67 Signed 2020-07-29 2020-07-29 2020-07-29 2020-06-30 2020-08-06 2020-09-04 2020-09-01 2020-09-15 2021-08-31 CRIP Procurement Officer Implementation Support Selection BZ-SIF-190275-CS-INDV / Individual CERC MOFAI CS-01: Project Contingent Emergency IBRD / 84160 Post Consultant Limited 15,000.00 7,143.92 Signed 2020-09-01 2020-09-03 2020-09-06 2020-09-14 2020-09-20 2020-12-18 2020-10-07 2021-01-04 2021-08-30 Assistant for 12 months Response Selection (MOFAI Central Office) BZ-SIF-190276-CS-INDV / Individual CERC MOFAI CS-02 (Corozal): Contingent Emergency IBRD / 84160 Post Consultant Limited 5,000.00 3,720.79 Signed 2020-09-01 2020-09-03 2020-09-06 2020-10-11 2020-09-20 2020-12-18 2020-10-07 2021-01-06 2021-03-15 Administrative Assistant for Response Selection District Office (5 months) BZ-SIF-190277-CS-INDV / CERC MOFAI CS-02 (Orange Individual Contingent Emergency Walk): Administrative IBRD / 84160 Post Consultant Limited 5,000.00 3,720.79 Signed 2020-09-01 2020-09-03 2020-09-06 2020-10-11 2020-09-20 2020-12-18 2020-10-07 2021-01-06 2021-03-15 Response Assistant for District Office (5 Selection months) BZ-SIF-190278-CS-INDV / Individual CERC MOFAI CS-02 (Belize): Contingent Emergency IBRD / 84160 Post Consultant Limited 5,000.00 3,720.79 Signed 2020-09-01 2020-09-03 2020-09-06 2020-10-09 2020-09-20 2020-12-18 2020-10-07 2021-01-11 2021-03-15 Administrative Assistant for Response Selection District Office (5 months) BZ-SIF-190279-CS-INDV / Individual CERC MOFAI CS-02 (Cayo): Contingent Emergency IBRD / 84160 Post Consultant Limited 5,000.00 3,720.79 Signed 2020-09-01 2020-09-03 2020-09-06 2020-09-20 2020-09-20 2020-12-18 2020-10-07 2021-01-11 2021-03-15 Administrative Assistant for Response Selection District Office (5 months) BZ-SIF-190280-CS-INDV / CERC MOFAI CS-02 (Stann Individual Contingent Emergency Creek): Administrative IBRD / 84160 Post Consultant Limited 5,000.00 3,720.79 Signed 2020-09-01 2020-09-03 2020-09-06 2020-09-14 2020-09-20 2020-12-18 2020-10-07 2021-01-06 2021-03-15 Response Assistant for District Office (5 Selection months) BZ-SIF-190281-CS-INDV / Individual CERC MOFAI CS-02 (Toledo): Contingent Emergency IBRD / 84160 Post Consultant Limited 5,000.00 3,720.79 Signed 2020-09-01 2020-09-03 2020-09-06 2020-09-14 2020-09-20 2020-12-18 2020-10-07 2021-01-05 2021-03-15 Administrative Assistant for Response Selection District Office (5 months) BZ-SIF-205574-CS-INDV / Short term consultant - Social Individual Assistance Customer Care Project Management and IBRD / 84160 Post Consultant Limited 8,475.00 5,595.33 Signed 2020-11-23 2020-11-20 2020-11-28 2020-11-23 2020-12-05 2020-12-09 2020-12-12 2021-01-06 2021-08-30 Manager to support the CERC Implementation Support Selection MHDSTPA in customer care and managing grievances Page 3 BZ-SIF-205579-CS-INDV / Short term consultant - Social Individual Project Management and Program Officer to support IBRD / 84160 Post Consultant 6,312.00 4,167.29 Signed 2020-11-23 2020-11-23 2020-11-27 2020-11-23 2020-12-04 2020-12-18 2020-12-11 2021-01-06 2021-08-29 Implementation Support the CERC MHDSTPA with Selection customer care and grievances BZ-SIF-236903-CS-INDV / Short term consultant - Individual Administrative Assistant for Contingent Emergency Under IBRD / 84160 Post Consultant Limited 2,250.00 0.00 2021-05-31 2021-06-08 2021-06-02 2021-06-10 2021-06-07 2021-06-11 2021-08-30 Cayo District Agriculture Response Implementation Selection Office under the CERC of the CRIP Page 4 PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, Desert Locust Response Project, P173702 Project Implementation agency: Ministry of Agriculture, Ethiopia Date of the Procurement Plan: April 6, 2012 Period covered by this Procurement Plan: April 2020 to March 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Procurement Directives of the Federal and Regional Governments of Ethiopia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. For national open competitive procurement the following requirement apply: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts; e. contracts with an appropriate allocation of responsibilities, risks, and liabilities; f. publication of contract award information; g. rights for the Bank to review procurement documentation and activities; h. an effective complaints mechanism; and i. maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Secondhand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable For national open competitive procurement the following requirement apply: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts; e. contracts with an appropriate allocation of responsibilities, risks, and liabilities; f. publication of contract award information; g. rights for the Bank to review procurement documentation and activities; h. an effective complaints mechanism; and i. maintenance of records of the Procurement Process. cable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. Since the project is an emergency response project the provisions of Procurement in Situations of Urgent Need of Assistance shall apply. PROCUREMENT Eastern Africa : Emergency Locust Response Program PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2020-05-11 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173702 GPN Date: 2020-12-03 Project Name: Emergency Locust Response Program Loan / Credit No: IDA / 66480, IDA / 66510 M Executing Agency(ies): inistry of Agriculture WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOA-172079-GO-DIR / Coordination and Early IDA / 66480 Post Direct Selection Direct 450,000.00 1,056,832.73 Signed 2020-05-08 2020-07-10 2020-05-13 2020-05-27 2020-05-27 2020-08-17 2020-06-16 Field Vehicles (Pickups) Warning Preparedness ET-MOA-175925-GO-RFQ / Pending Tigray region procurement of Livelihoods Protection and IDA / 66510 Prior Direct Selection Direct 3,685,240.00 0.00 Implementati 2020-06-12 2020-06-17 2020-07-22 2020-07-31 fertilizer 56696 Qtls from Rehabilitation on EARC ET-MOA-175930-GO-RFQ / Pending Amhara procurement of Livelihoods Protection and IDA / 66510 Post Direct Selection Direct 746,200.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-08-03 fertilizer 11480 Qtl from Rehabilitation on Amhara Seed Enterprise (ASE) ET-MOA-175931-GO-RFQ / Pending Oromia purchase of fertilizer Livelihoods Protection and IDA / 66510 Post Direct Selection Direct 1,276,600.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-07-31 19640 Qtl from Oromia Seed Rehabilitation on Enterprise (OSE) ET-MOA-175932-GO-RFQ / Pending Livelihoods Protection and SNNP purchase of fertilizer IDA / 66510 Post Direct Selection Direct 158,080.00 0.00 Implementati 2020-06-11 2020-06-16 2020-07-21 2020-07-31 Rehabilitation 2432 Qtl from SSE on ET-MOA-175933-GO-RFQ / Pending Livelihoods Protection and Somali purchase of fertilizer IDA / 66510 Post Direct Selection Direct 4,063,800.00 0.00 Implementati 2020-06-12 2020-06-17 2020-07-22 2020-07-31 Rehabilitation 62520 Qtl on ET-MOA-175934-GO-RFQ / Pending Livelihoods Protection and DD purchase of fertilizer 1544 IDA / 66510 Post Direct Selection Direct 100,360.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-08-03 Rehabilitation Qtl on ET-MOA-175937-GO-RFQ / Pending Livelihoods Protection and Afar purchase of fertilizer IDA / 66510 Post Direct Selection Direct 200,720.00 0.00 Implementati 2020-06-12 2020-06-17 2020-07-22 2020-07-30 Rehabilitation 3088 Qtl from EARC on ET-MOA-178440-GO-DIR / Pending Livelihoods Protection and Tigray seed purchase 7087 IDA / 66510 Post Direct Selection Direct 765,396.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2021-01-21 Rehabilitation Qtls of Seed from EARC on ET-MOA-178443-GO-DIR / Pending Livelihoods Protection and 1435 Qtls of seed from IDA / 66510 Post Direct Selection Direct 154,980.00 0.00 Implementati 2020-06-12 2020-06-17 2020-07-22 2020-07-31 Rehabilitation Amhara Seed Enterprise (ASE) on ET-MOA-178446-GO-DIR / Pending Oromia Seed purchase 2455 Livelihoods Protection and IDA / 66510 Post Direct Selection Direct 265,140.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-07-31 Qtls from Oromia Seed Rehabilitation on Enterprise (OSE) ET-MOA-178447-GO-DIR / Pending SNNP seed purchase 304 Qtls Livelihoods Protection and IDA / 66510 Post Direct Selection Direct 32,832.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-07-30 from Southern Seed Enterprise Rehabilitation on (SSE) ET-MOA-178448-GO-DIR / Pending Livelihoods Protection and Afar seed purchase 386 Qtls IDA / 66510 Post Direct Selection Direct 41,688.00 0.00 Implementati 2020-06-16 2020-06-21 2020-07-26 2020-08-03 Rehabilitation from EARC on ET-MOA-178449-GO-DIR / Pending Livelihoods Protection and Somali seed purchase 7,815 IDA / 66510 Post Direct Selection Direct 844,020.00 0.00 Implementati 2020-06-11 2020-06-16 2020-07-21 2020-07-31 Rehabilitation Qtls from EARC on ET-MOA-178450-GO-DIR / Pending Livelihoods Protection and DD seed purchase 193 qtls IDA / 66510 Post Direct Selection Direct 20,844.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-07-31 Rehabilitation from EARC on ET-MOA-178452-GO-DIR / Pending Amhara feed purchase 318 Livelihoods Protection and IDA / 66510 Post Direct Selection Direct 143,100.00 0.00 Implementati 2020-06-15 2020-06-20 2020-07-25 2020-07-30 qtls from Amhara Seed Rehabilitation on Enterprise ET-MOA-178453-GO-DIR / Pending Oromia feed seed purchase Livelihoods Protection and IDA / 66510 Post Direct Selection Direct 720,000.00 0.00 Implementati 2020-06-12 2020-06-17 2020-07-22 2020-07-29 1600 qtls from Oromia seed Rehabilitation on enterprise ET-MOA-178454-GO-DIR / Pending SNNP feed seeds purchase Livelihoods Protection and IDA / 66510 Post Direct Selection Direct 562,500.00 0.00 Implementati 2020-06-12 2020-06-17 2020-07-22 2020-07-30 1250 qtls from Southern seed Rehabilitation on enterprise (SSE) ET-MOA-178456-GO-DIR / Pending Livelihoods Protection and Afar feed seeds purchase IDA / 66510 Post Direct Selection Direct 1,125,000.00 0.00 Implementati 2020-06-16 2020-06-21 2020-07-26 2020-08-03 Rehabilitation 2500 qtls from EARC on Page 1 ET-MOA-178467-GO-DIR / Pending Livelihoods Protection and Somali feed seeds 2400 Qtls IDA / 66510 Post Direct Selection Direct 1,080,000.00 0.00 Implementati 2020-06-12 2020-06-17 2020-07-22 2020-07-30 Rehabilitation from EARC on ET-MOA-178468-GO-DIR / Pending Livelihoods Protection and DD feed seeds 200 qtls from IDA / 66510 Post Direct Selection Direct 90,000.00 0.00 Implementati 2020-06-12 2020-06-17 2020-07-22 2020-07-31 Rehabilitation EARC on ET-MOA-184656-GO-DIR / Equipment for Desert Locust Pending Surveillance and Control Response Project (Knapsacks IDA / 66510 Prior Direct Selection Direct 7,800,000.00 0.00 Implementati 2020-07-19 2020-07-24 2020-08-12 2020-08-27 Measures ULV sprayers, PPE, Vehicle on mounted sprayers) Pending ET-MOA-184728-GO-DIR / Surveillance and Control IDA / 66510 Post Direct Selection Direct 50,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-18 2020-08-31 Drones for survey Measures on ET-MOA-199303-GO-DIR / Pending Surveillance and Control 20 Agricultural sprayer IDA / 66510 Post Direct Selection Direct 700,000.00 0.00 Implementati 2020-10-20 2020-10-25 2020-11-29 2021-01-13 Measures Drones on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOA-181756-NC-DIR / Lease of Aircraft sprayer (4 Surveillance and Control IDA / 66510 Prior Direct Selection 5,600,000.00 0.00 Under Review 2020-07-07 2020-07-12 2020-07-25 2021-01-21 aircrafts) from Zemen Flights Measures service Pending ET-MOA-199300-NC-DIR / Surveillance and Control IDA / 66510 Post Direct Selection Direct 315,000.00 0.00 Implementati 2020-10-19 2020-10-24 2020-11-28 2021-01-12 Lease of four sprayer drones Measures on Pending ET-MOA-199304-NC-DIR / Surveillance and Control IDA / 66510 Prior Direct Selection Direct 4,500,000.00 0.00 Implementati 2020-10-15 2020-10-20 2020-11-24 2021-02-22 Lease of sprayer air crafts Measures on ET-MOA-236964-NC-RFQ / Charter service to transport Pending Surveillance and Control Request for Single Stage - One back to South Africa after IDA / 66510 Post Limited 390,000.00 0.00 Implementati 2021-06-05 2021-07-17 2021-08-06 Measures Quotations Envelope service contract of the on Helicopters is completed. ET-MOA-237036-NC-RFQ / Pending Transport contract to deliver Livelihoods Protection and Request for Single Stage - One IDA / 66510 Post Limited 150,000.00 0.00 Implementati 2021-06-05 2021-07-10 2021-08-09 the "improved seeds" for the Rehabilitation Quotations Envelope on Tigray regions. ET-MOA-238897-NC-RFQ / Transport service for 11,584 Pending Livelihoods Protection and Request for Single Stage - One quintals of seed from Mekelle IDA / 66510 Post Limited 150,000.00 0.00 Implementati 2021-06-16 2021-07-06 2021-07-21 Rehabilitation Quotations Envelope to various woredas in Tigray on region CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOA-197750-CS-INDV / Individual Employment of Monitoring, Pending IDA / 66510 Project Management Post Consultant Open 48,000.00 0.00 2020-10-18 2020-11-27 2020-12-11 2021-01-06 2022-01-05 Evaluation and Learning Implementation Selection (MEAL) specialist ET-MOA-197752-CS-INDV / Individual Employment of Environmental Pending IDA / 66510 Project Management Post Consultant Open 48,000.00 0.00 2020-10-13 2020-11-22 2020-12-13 2021-01-05 2022-01-04 and Social Safeguards Implementation Selection Specialist ET-MOA-197753-CS-INDV / Individual Pending Employment of Pest IDA / 66510 Project Management Post Consultant Open 48,000.00 0.00 2020-10-14 2020-11-22 2020-12-10 2020-12-30 2021-12-29 Implementation Management Specialist Selection ET-MOA-197751-CS-INDV / Individual Pending Employment of IDA / 66510 Project Management Post Consultant Open 48,000.00 0.00 2020-10-15 2020-11-23 2020-12-08 2021-01-07 2022-01-06 Implementation Communication specialist Selection ET-MOA-199298-CS-INDV / Individual Pending Employment of data IDA / 66510 Project Management Post Consultant Open 48,000.00 0.00 2020-10-16 2020-11-25 2020-12-09 2020-12-28 2021-12-27 Implementation management specialist Selection Page 2 PROCUREMENT PLAN (Textual Part) Project information: Senegal Casamance Economic Development ProjectP175325 Project Implementation agency: Project Implementation Unit Pole de Développement de la Casamance ( PPDC)under Ministry of Territorial Collectivity, Management and Development Date of the Procurement Plan: April 18th, 2021 Period covered by this Procurement Plan: April 30th 2021 – October 30 th 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” All goods, non-consulting services and consulting services required for the Activities and to be financed out of the proceeds of the Advance shall be procured in accordance with the requirements set forth or referred to in the “World Bank Procurement Regulations for IPF Borrowers” dated on July 2016 and updated on August 2018 and November 2020 (“Procurement Regulations”) and the provisions of the Recipient’s procurement plan for the Activities dated November 15, 2020 (“Procurement Plan”) provided for under Section IV of the Procurement Regulations, as the same may be updated from time to time in agreement with the World Bank. In addition, the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Decree # 2014-1212 dated September 22, 2014, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. . When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable”. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: “Not Applicable”. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): “Not Applicable”. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable: “Not Applicable” . Other Relevant Procurement Information: “Not Applicable”. PROCUREMENT Senegal : Casamance Economic Development Project PLAN General Information Country: Senegal Bank’s Approval Date of the Original Procurement Plan: 2021-05-31 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175325 GPN Date: Project Name: Casamance Economic Development Project Loan / Credit No: IDA / V3670 Casamance Economic Development Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SN-PDEC-237672-CW-RFQ / Sélection d'entreprise pour la Empowering communities Request for Pending réalisation des travaux de Request for Single Stage - One 2022-05- IDA / V3670 and local institutions to build Post Limited Quotations (Non 140,000.00 0.00 Implementat 2021-09-27 2021-11-22 sous-projets d'engagement Quotations Envelope 21 social cohesion Bank-SPD) ion citoyen dans la commune de Diaroumé SN-PDEC-237666-CW-RFQ / Broadening sustainable Sélection d'entreprise pour Request for Pending livelihoods opportunities for Request for Single Stage - One 2022-05- aménager des pépinières, IDA / V3670 Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-09-15 2021-11-10 greater social and economic Quotations Envelope 09 abris et bureaux dans les Bank-SPD) ion inclusion fermes horticoles SN-PDEC-237667-CW-RFQ / Sélection d'entreprises pour la Empowering communities Request for Pending réalisation des travaux de Request for Single Stage - One 2022-05- IDA / V3670 and local institutions to build Post Limited Quotations (Non 140,000.00 0.00 Implementat 2021-09-20 2021-11-15 sous-projets d'engagement Quotations Envelope 14 social cohesion Bank-SPD) ion citoyen dans la commune de Diégoune SN-PDEC-237671-CW-RFQ / Sélection d'entreprise pour la Empowering communities Request for Pending réalisation des travaux de Request for Single Stage - One 2022-05- IDA / V3670 and local institutions to build Post Limited Quotations (Non 140,000.00 0.00 Implementat 2021-09-20 2021-11-15 sous-projets d'engagement Quotations Envelope 14 social cohesion Bank-SPD) ion citoyen dans la commune de Pakour GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending SN-PDEC-237663-GO-RFQ / Request for Single Stage - One IDA / V3670 Project Management Post Limited 18,200.00 0.00 Implementati 2021-09-04 2021-10-30 2021-12-29 Acquisition TOMPRO s/web Quotations Envelope on SN-PDEC-237664-GO-RFQ / Pending Request for Single Stage - One Acquisition du Logiciel de IDA / V3670 Project Management Post Limited 2,000.00 0.00 Implementati 2021-09-04 2021-10-30 2022-01-28 Quotations Envelope Planification MS PROJECT on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SN-PDEC-237204-NC-RFQ / Pending Sélection d'une entreprise Request for Single Stage - One IDA / V3670 Project Management Post Limited 4,800.00 0.00 Implementati 2021-07-05 2021-08-30 2022-08-30 chargée du nettoyage des Quotations Envelope on locaux du projet SN-PDEC-237665-NC-RFQ / Pending Sélection d'une entreprise Request for Single Stage - One IDA / V3670 Project Management Post Limited 4,800.00 0.00 Implementati 2021-08-02 2021-09-27 2022-09-27 chargée du gardiennage des Quotations Envelope on locaux du projet CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SN-PDEC-237142-CS-QCBS / Recrutement du bureau d'études et de contrôle des Quality And Cost- Pending IDA / V3670 Project Management Post Open - National 240,000.00 0.00 2021-08-11 2021-09-01 2021-10-15 2021-11-12 2021-12-12 2022-01-16 2022-02-20 2023-02-20 pistes de désenclavement Based Selection Implementation dans les régions de Sédhiou et Kolda SN-PDEC-237023-CS-CQS / Consultant Sélection de firme pour le Under IDA / V3670 Project Management Post Qualification Limited 48,000.00 0.00 2021-05-31 2021-06-05 2021-06-05 2021-07-05 2021-08-09 2021-10-08 recrutement du personnel clé Implementation Selection du Projet SN-PDEC-237658-CS-CQS / Sélection d'un Consultant pour la préparation des instruments de sauvegarde environnementale et sociale : Consultant Pending CGES, PCR,PGPP,Plan IDA / V3670 Project Management Post Qualification Limited 160,000.00 0.00 2021-09-29 2021-10-13 2021-11-12 2021-12-17 2022-02-15 Implementation d'Engagement Selection Environnemental et Social (PEES), Plan de Mobilisation des Parties Prenantes (PMPP), etc. INDIVIDUAL CONSULTANTS Page 1 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SN-PDEC-237049-CS-INDV / Sélection d'un consultant pour réaliser les études Individual Pending d'identification et de IDA / V3670 Project Management Post Consultant Limited 36,000.00 0.00 2021-06-10 2021-06-15 2021-07-06 2021-08-10 2021-09-15 Implementation priorisation des communes Selection bénéficiaires dans les 3 régions de la Casamance SN-PDEC-237060-CS-INDV / Sélection d'un Consultant pour l'assistance technique de la Chambre de Commerce Individual Pending d'Industrie et d'Agriculture de IDA / V3670 Project Management Post Consultant Limited 24,000.00 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2021-10-14 Implementation Ziguinchor (CCIAZ) pour le Selection suivi de la concession de la Plateforme Economique Intégrée de Bignona (PEIB) SN-PDEC-237065-CS-INDV / Sélection de consultants chargé des études, du suivi et Individual du contrôle de la réalisation Pending IDA / V3670 Project Management Post Consultant Limited 24,000.00 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2022-02-11 de sous-projets Implementation Selection d'engagement citoyen dans les communes de Diégoune, Diaroumé et de Pakour SN-PDEC-237067-CS-INDV / Sélection d'un consultant pour une mission d'assistance technique aux Individual Pending coopérateurs/coopératrices IDA / V3670 Project Management Post Consultant Limited 12,000.00 0.00 2021-06-17 2021-06-22 2021-07-13 2021-08-17 2022-02-13 Implementation pour l'exploitation, la gestion Selection et la mise en marché des produits horticoles y compris des visites d'échanges SN-PDEC-237070-CS-INDV / Sélection d'un consultant chargé d'élaborer un schéma Individual Pending de Suivi-évaluation intégrant IDA / V3670 Project Management Post Consultant Limited 48,000.00 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2022-02-11 Implementation les parties prenantes et Selection utilisant des indicateurs sociaux SN-PDEC-237074-CS-INDV / Sélection d'un Consultant Individual Pending pour l'étude des aspirations IDA / V3670 Project Management Post Consultant Limited 30,000.00 0.00 2021-06-24 2021-06-29 2021-07-20 2021-08-24 2021-10-23 Implementation socio-économiques des Selection jeunes et des femmes SN-PDEC-237076-CS-INDV / Sélection d'un consultant pour Individual l'étude des mécanismes Pending IDA / V3670 Project Management Post Consultant Limited 30,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2021-11-18 d'adaptation des populations Implementation Selection au changement climatique en Casamance SN-PDEC-237135-CS-INDV / Sélection d'un Consultant Individual Pending pour l'élaboration d'un IDA / V3670 Project Management Post Consultant Limited 48,000.00 0.00 2021-07-30 2021-08-04 2021-08-25 2021-09-29 2021-11-28 Implementation manuel de procédures Selection techniques, comptables et financières SN-PDEC-237136-CS-INDV / Individual Recrutement Spécialiste NTIC Pending IDA / V3670 Project Management Post Consultant Limited 5,600.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 pour accompagner la Implementation Selection préparation du Projet SN-PDEC-234858-CS-CDS / Sélection directe du Under Coordinateur du Projet de IDA / V3670 Project Management Post Direct Selection Direct 63,500.00 0.00 2021-06-11 2021-06-05 2021-07-01 2021-06-08 2021-07-24 2022-07-24 Implementation Developpement Economique de la Casamance (PDEC) SN-PDEC-237397-CS-INDV / Individual Pending Recrutement de l'expert en IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 2021-07-28 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Implementation communication du projet Selection SN-PDEC-237399-CS-INDV / Individual Recrutement d'un spécialiste IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 Under Review 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 en financement des projets Selection SN-PDEC-237578-CS-INDV / Recrutement d'un Consultant Individual Under en infrastructures pour IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Implementation appuyer la formulation du Selection Projet SN-PDEC-237581-CS-INDV / Individual Sélection du comptable du IDA / V3670 Project Management Post Consultant Open 24,000.00 0.00 Under Review 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 projet Selection SN-PDEC-237673-CS-INDV / Individual Recrutement d'un consultant IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 Under Review 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Responsable Administratif et Selection Financier du Projet SN-PDEC-237674-CS-INDV / Individual Under Recrutement d'un spécialiste IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Implementation en développement rural Selection SN-PDEC-237660-CS-INDV / Recrutement d'un Consultant Individual en sauvegarde IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 Under Review 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 environnementale et sociale Selection pour appuyer la formulation du Projet Page 2 SN-PDEC-237662-CS-INDV / Sélection du Consultant pour les études d'identification et de priorisation des pistes Individual nécessitant des traitements de Pending IDA / V3670 Project Management Post Consultant Limited 48,000.00 0.00 2021-08-31 2021-09-05 2021-09-26 2021-10-31 2021-12-15 points critiques pour Implementation Selection améliorer l'accessibilité rurale en Casamance avec les élus, administrations, opérateurs économiques, populations SN-PDEC-237661-CS-INDV / Individual Recrutement du Consultant Under IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Spécialiste en Passation des Implementation Selection Marchés SN-PDEC-239887-CS-INDV / Individual Sélection d'un consultant Pending IDA / V3670 Project Management Post Consultant Open 45,000.00 0.00 2021-06-23 2021-08-11 2021-08-21 2021-09-25 2022-09-25 chargé du Suivi - Evaluation Implementation Selection du Projet SN-PDEC-239894-CS-INDV / Individual Sélection du consultant Pending IDA / V3670 Project Management Post Consultant Open 45,000.00 0.00 2021-06-23 2021-08-11 2021-09-01 2021-10-06 2022-10-06 chargé du Développement Implementation Selection Social et Genre SN-PDEC-239899-CS-INDV / Sélection du consultant Individual Pending chargé de préparer les états IDA / V3670 Project Management Post Consultant Limited 5,000.00 0.00 2021-06-23 2021-06-28 2021-07-19 2021-08-23 2021-09-22 Implementation financiers en vue de l'audit du Selection ppdc Page 3 PROCUREMENT PLAN Project information: Uganda, East Africa Skills for Transformation and Regional Integration Project (EASTRIP) P163399 Project Implementation agency: Inter-University Council for East Africa Date of the Procurement Plan: April 27, 2018 Period covered by this Procurement Plan: May 2018- January 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: As IUCEA does not follow Uganda PPDA, when approaching the national market (as specified in the Procurement Plan tables in STEP), Bank’s Procurement Regulations will be followed. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations –Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None PROCUREMENT Eastern Africa : East Africa Skills for Transformation and Regional Integration Project (EASTRIP) PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2019-04-12 2021-05-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163399 GPN Date: 2019-08-06 Project Name: East Africa Skills for Transformation and Regional Integration Project (EASTRIP) Loan / Credit No: IDA / 63350 M Executing Agency(ies): inistry of Science and Higher Education - ET WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ET-MOSHE - ET-109520-CW- RFB / Construction of Building Pending Creating national TVET Single Stage - One 2021-01- Lot-1 TVET QA Authority IDA / 63350 Post Request for Bids Open - National 1,600,000.00 0.00 Implementat 2020-04-13 2020-04-18 2020-05-30 2020-06-29 2020-08-03 enabling environment Envelope 30 Lot-2 Research and ion Development Institute (at TI) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOSHE - ET-109515-GO- Creating national TVET Single Stage - One IDA / 63350 Prior Request for Bids Open - International 2,100,000.00 0.00 Canceled 2019-06-28 2019-07-03 2019-08-14 2019-09-13 2019-10-18 2020-04-15 RFB / Procurement of Vehicles enabling environment Envelope ET-MOSHE - ET-135533-GO- Creating national TVET Request for Single Stage - One RFQ / Procurement of Office IDA / 63350 Post Open - National 76,000.00 0.00 Canceled 2019-10-06 2019-12-01 2020-05-29 enabling environment Quotations Envelope Furniture ET-MOSHE - ET-138762-GO- Creating national TVET Request for Single Stage - One RFQ / Purchase of office IDA / 63350 Post Open - National 5,000.00 2,276.13 Signed 2019-10-14 2019-12-09 2020-08-04 2020-06-06 enabling environment Quotations Envelope stationary ET-MOSHE - ET-167220-GO- Creating national TVET Request for Single Stage - One IDA / 63350 Post Limited 15,000.00 14,059.94 Signed 2020-04-08 2020-04-06 2020-06-03 2020-05-20 2020-11-30 RFQ / Laptop purchase enabling environment Quotations Envelope ET-MOSHE - ET-173744-GO- RFQ / Office Furniture Creating national TVET Request for Single Stage - One IDA / 63350 Post Limited 38,000.00 21,240.35 Signed 2020-05-23 2020-06-12 2020-07-18 2020-06-09 2021-01-14 Procurement for the new enabling environment Quotations Envelope project office ET-MOSHE - ET-176097-GO- Creating national TVET UN Agencies UN / Procurement of different IDA / 63350 Post Direct 1,000,000.00 960,539.47 Signed 2020-06-05 2020-06-12 2020-06-10 2020-06-18 2020-07-15 2020-07-17 2021-01-11 enabling environment (Direct) types of Vehicles ET-MOSHE - ET-181056-GO- Pending RFQ / Procurement of Creating national TVET Request for Single Stage - One IDA / 63350 Post Limited 5,300.00 0.00 Implementati 2020-06-30 2020-08-14 2020-08-24 Sanitation and Canteen enabling environment Quotations Envelope on Materials for the project office ET-MOSHE - ET-181058-GO- Pending Creating national TVET Request for Single Stage - One RFQ / Procurement of Office IDA / 63350 Post Limited 6,700.00 0.00 Implementati 2020-06-30 2020-08-10 2020-08-20 enabling environment Quotations Envelope Furniture and Fixtures on ET-MOSHE - ET-181057-GO- Pending Creating national TVET Request for Single Stage - One RFQ / Procurement of Office IDA / 63350 Post Limited 43,000.00 0.00 Implementati 2020-06-30 2020-08-10 2020-08-20 enabling environment Quotations Envelope Equipment on ET-MOSHE - ET-181288-GO- Pending Creating national TVET Request for Single Stage - One RFQ / Procurement of IDA / 63350 Post Limited 7,000.00 0.00 Implementati 2020-06-30 2020-07-22 2020-08-01 enabling environment Quotations Envelope Stationery Materials on ET-MOSHE - ET-198515-GO- Pending Creating national TVET Single Stage - One RFB / Procurement of Diesel IDA / 63350 Post Request for Bids Open - National 150,000.00 0.00 Implementati 2020-10-30 2020-11-04 2020-12-04 2020-12-19 2021-01-23 2021-04-23 enabling environment Envelope Generator on ET-MOSHE - ET-198533-GO- Creating national TVET Single Stage - One RFB / Supply and Delivery of IDA / 63350 Post Request for Bids Open - International 1,000,000.00 0.00 Canceled 2020-11-25 2020-11-30 2021-01-11 2021-02-10 2021-03-17 2021-09-13 enabling environment Envelope Vehicles ET-MOSHE - ET-198496-GO- RFB / TVET Campus Network Creating national TVET Single Stage - One IDA / 63350 Prior Request for Bids Open - International 8,000,000.00 0.00 Canceled 2020-11-03 2021-04-13 2020-11-08 2020-12-20 2021-01-19 2021-02-23 2021-08-22 Infrastructure for the 19 enabling environment Envelope Colleges Strengthening selected ET-MOSHE - ET-225571-GO- Regional Flagship TVET Under RFQ / Procurement of Office Request for Single Stage - One IDA / 63350 Institutes for high quality Post Limited 75,000.00 0.00 Implementati 2021-03-28 2021-05-13 2021-05-17 2021-05-21 Furniture and Fixtures for Quotations Envelope skills development in priority on MoSHE sectors Strengthening selected ET-MOSHE - ET-225566-GO- Regional Flagship TVET Pending Single Stage - One RFB / Supply, Installation and IDA / 63350 Institutes for high quality Prior Request for Bids Open - International 2,300,000.00 0.00 Implementati 2021-03-31 2021-04-15 2021-05-30 2021-06-29 2021-07-24 2021-10-22 Envelope Commissioning of TVET MIS skills development in priority on sectors ET-MOSHE - ET-229183-GO- Pending Creating national TVET DIR / Procurement of IDA / 63350 Post Direct Selection Direct 1,000,000.00 0.00 Implementati 2021-04-20 2021-04-25 2021-05-30 2021-11-26 enabling environment Different Types of Vehicles on ET-MOSHE - ET-236746-GO- Under RFB / TVET Campus Network Creating national TVET Single Stage - One IDA / 63350 Prior Request for Bids Open - International 5,000,000.00 0.00 Implementati 2021-05-31 2021-06-18 2021-06-05 2021-06-24 2021-07-17 2021-08-16 2021-09-20 2022-03-19 Infrastructure for 10 selected enabling environment Envelope on Poly Technic Colleges NON CONSULTING SERVICES Page 1 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOSHE - ET-173347-NC- Under RFQ / Renovation and Creating national TVET Request for Single Stage - One IDA / 63350 Post Limited 18,000.00 0.00 Implementati 2020-05-20 2020-05-22 2020-07-15 2021-01-11 painting service of the newly enabling environment Quotations Envelope on rented Project Office Building ET-MOSHE - ET-173356-NC- RFQ / Selecting a firm that Creating national TVET Request for Single Stage - One manages the cleaning of the IDA / 63350 Post Limited 5,500.00 4,495.54 Signed 2020-05-20 2020-05-22 2020-07-15 2020-06-23 2021-01-11 enabling environment Quotations Envelope newly rented project office for one year period ET-MOSHE - ET-173367-NC- RFQ / Security Service- Under Creating national TVET Request for Single Stage - One Selecting a firm that manages IDA / 63350 Post Limited 6,500.00 0.00 Implementati 2020-05-27 2020-05-22 2020-07-22 2021-01-18 enabling environment Quotations Envelope the security of the office on building and office property CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOSHE - ET-198440-CS- QCBS / Development of 17 Creating national TVET Quality And Cost- Under IDA / 63350 Prior Open - International 1,800,000.00 0.00 2020-10-20 2020-11-13 2020-11-10 2020-11-22 2020-12-24 2021-03-23 2021-01-21 2021-02-20 2021-03-27 2021-05-01 2021-10-28 Occupational Standards in enabling environment Based Selection Implementation EASTRIP priority sectors ET-MOSHE - ET-198487-CS- Creating national TVET Quality And Cost- QCBS / Ethiopian Sustainable IDA / 63350 Prior Open - International 300,000.00 0.00 Canceled 2020-10-23 2020-11-13 2020-11-13 2020-11-22 2020-12-27 2021-01-24 2021-02-23 2021-03-30 2021-05-04 2021-10-31 enabling environment Based Selection TVET Financing Strategy ET-MOSHE - ET-198462-CS- QCBS / Selection of a Consulting Firm that develop Creating national TVET Quality And Cost- Under IDA / 63350 Post Open - National 27,000.00 0.00 2020-10-20 2020-10-27 2020-11-10 2020-11-02 2020-12-14 2020-12-11 2020-12-29 2021-01-28 2021-02-26 2021-04-02 2021-07-31 a strategic document for the enabling environment Based Selection Implementation Establishment of TVET Quality Assurance Agency ET-MOSHE - ET-198478-CS- QCBS / Development of Creating national TVET Quality And Cost- Under Strategic Framework for the IDA / 63350 Post Open - National 13,500.00 0.00 2020-10-25 2020-10-27 2020-11-15 2020-11-02 2020-12-29 2020-12-11 2021-01-13 2021-02-12 2021-03-13 2021-04-17 2021-08-15 enabling environment Based Selection Implementation Establishment of TVET Research Institute ET-MOSHE - ET-192202-CS- Creating national TVET Least Cost QCBS / External Audit for the IDA / 63350 Post Open - National 35,000.00 0.00 Canceled 2020-09-08 2020-09-21 2020-09-29 2020-10-15 2020-11-12 2020-12-10 2021-01-09 2021-02-13 2021-03-20 2021-09-16 enabling environment Selection FY 2019/2020 ET-MOSHE - ET-203190-CS- Creating national TVET Least Cost LCS / Selection of Financial IDA / 63350 Post Open - National 35,000.00 2,244.66 Signed 2020-11-09 2020-11-13 2020-11-19 2020-12-09 2020-11-19 2020-12-19 2020-12-07 2021-01-03 2020-12-07 2021-01-20 2020-12-11 2021-02-06 2020-12-15 2021-03-23 enabling environment Selection Audit Firm ET-MOSHE-ET-198487-CS- QCBS-2 / Selection of a Creating national TVET Quality And Cost- Under Consulting Firm to Develop IDA / 63350 Post Open - National 300,000.00 0.00 2021-02-20 2021-02-22 2021-02-23 2021-03-20 2021-04-10 2021-04-25 2021-05-30 2021-06-28 2021-10-26 enabling environment Based Selection Implementation Sustainable TVET Financing Strategy ET-MOSHE - ET-109513-CS- QCBS / Consultancy Service for Detail Engineering Design, Tender Document Creating national TVET Quality And Cost- IDA / 63350 Post Open - National 200,000.00 0.00 Canceled 2019-05-30 2021-04-06 2019-06-20 2019-08-03 2019-08-31 2019-09-30 2019-11-04 2019-12-09 2022-05-27 Preparation, Construction enabling environment Based Selection Supervision and contracts administration of QA Authority and Research and Development Institute. ET-MOSHE - ET-229572-CS- CQS / Consultancy Service for Detail Engineering Design, Consultant Tender Document Creating national TVET Under IDA / 63350 Post Qualification Limited 200,000.00 0.00 2021-04-25 2021-04-20 2021-05-09 2021-05-03 2021-06-08 2021-07-13 2023-01-04 Preparation, Construction enabling environment Implementation Selection Supervision and contracts administration of QA Authority and Research and Development Institute ET-MOSHE - ET-229840-CS- CQS / Selection of a Consultant Creating national TVET Under Consulting Firm to Develop an IDA / 63350 Post Qualification Limited 84,000.00 0.00 2021-04-23 2021-05-07 2021-05-07 2021-06-06 2021-07-11 2021-09-09 enabling environment Implementation Environment and Social Selection Impact Assessment (ESIA) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual ET-MOSHE - ET-109517-CS- Creating national TVET IDA / 63350 Prior Consultant Open 16,800.00 0.00 Canceled 2019-04-15 2019-09-30 2019-06-03 2019-06-24 2019-07-29 2020-07-28 INDV / Procurement Specialist enabling environment Selection ET-MOSHE - ET-110227-CS- Individual Creating national TVET Under INDV / Financial Management IDA / 63350 Post Consultant Open 14,400.00 0.00 2019-04-12 2019-09-03 2019-05-31 2019-06-21 2019-07-26 2020-07-25 enabling environment Implementation Specialist Selection Individual ET-MOSHE - ET-110232-CS- Creating national TVET Under IDA / 63350 Post Consultant Open 30,000.00 0.00 2019-04-18 2019-10-04 2019-06-06 2019-06-27 2019-08-01 2020-07-31 INDV / Safeguard Specialist enabling environment Implementation Selection Individual ET-MOSHE - ET-110321-CS- Creating national TVET IDA / 63350 Post Consultant Open 40,000.00 25,529.04 Signed 2019-04-12 2019-10-20 2019-05-31 2020-01-01 2019-06-21 2020-01-01 2019-07-26 2020-01-01 2020-07-25 INDV / Project Coordinator enabling environment Selection Page 2 ET-MOSHE - ET-129298-NC- Individual Creating national TVET Under RFP / Recruitment of TVET IDA / 63350 Post Consultant Open 14,400.00 0.00 2019-09-05 2019-09-13 2019-10-24 2019-11-14 2019-12-19 2020-12-18 enabling environment Implementation Specialist at MoSHE Selection Strengthening selected ET-MOSHE - ET-151599-CS- Regional Flagship TVET Individual INDV / Recruitment of IDA / 63350 Institutes for high quality Prior Consultant Limited 18,000.00 0.00 Canceled 2019-12-23 2019-12-25 2019-12-28 2019-12-26 2020-01-18 2020-02-22 2020-08-20 Procurement Specialist for skills development in priority Selection EASTRIP-MoSHE sectors ET-MOSHE - ET-155038-CS- Individual CDS / Recruitment of Creating national TVET IDA / 63350 Prior Consultant Limited 21,000.00 2,115.44 Signed 2020-01-24 2020-01-23 2020-01-29 2020-01-23 2020-02-19 2020-03-17 2020-03-25 2020-04-01 2020-09-21 Procurement Specialist for enabling environment Selection MoSHE ET-MOSHE - ET-110229-CS- Individual Creating national TVET INDV / Monitoring & IDA / 63350 Post Consultant Open 14,400.00 0.00 Canceled 2019-04-12 2019-10-04 2019-05-31 2019-06-21 2019-07-26 2020-07-25 enabling environment Evaluation Specialist Selection Strengthening selected ET-MOSHE - ET-164193-CS- Regional Flagship TVET Individual CQS / Procurement Specialist IDA / 63350 Institutes for high quality Prior Consultant Limited 20,000.00 17,587.48 Signed 2020-03-20 2020-05-01 2020-03-25 2020-08-24 2020-04-15 2020-10-08 2020-05-20 2020-10-15 2020-11-16 #2 skills development in priority Selection sectors Strengthening selected Regional Flagship TVET Individual ET-MOSHE - ET-164194-CS- Under IDA / 63350 Institutes for high quality Post Consultant Limited 15,000.00 0.00 2020-03-23 2020-04-02 2020-03-28 2020-04-18 2020-05-23 2020-11-19 CQS / Finance Specialist # 2 Implementation skills development in priority Selection sectors Strengthening selected ET-MOSHE - ET-164195-CS- Regional Flagship TVET Individual CQS / Recruitment of IDA / 63350 Institutes for high quality Post Consultant Limited 20,000.00 15,366.96 Signed 2020-03-20 2020-03-23 2020-03-25 2020-05-15 2020-04-15 2020-11-11 2020-05-20 2020-10-12 2020-11-16 Monitoring and Evaluation skills development in priority Selection Specialist sectors Strengthening selected ET-MOSHE - ET-165716-CS- Regional Flagship TVET Individual Pending INDV / Gender Specialist IDA / 63350 Institutes for high quality Post Consultant Open 20,000.00 0.00 2020-03-27 2020-05-15 2020-06-05 2020-07-10 2021-01-06 Implementation Recruitment skills development in priority Selection sectors Strengthening selected ET-MOSHE - ET-172339-CS- Regional Flagship TVET Individual INDV / Contract Under IDA / 63350 Institutes for high quality Prior Consultant Open 22,000.00 0.00 2020-05-06 2020-05-11 2020-06-24 2020-07-15 2020-08-19 2021-02-15 Administration Officer Implementation skills development in priority Selection recruitment sectors ET-MOSHE - ET-173745-CS- Individual Creating national TVET Under INDV / Hiring an IDA / 63350 Post Consultant Limited 10,000.00 0.00 2020-05-20 2020-06-16 2020-05-25 2020-06-15 2020-07-20 2021-01-16 enabling environment Implementation Administrative Officer Selection ET-MOSHE - ET-201291-CS- INDV / Selection of Individual Individual Creating national TVET Consultant that supports in IDA / 63350 Post Consultant Limited 30,000.00 32,126.34 Signed 2020-11-05 2020-11-04 2020-11-10 2020-11-18 2020-11-25 2020-12-14 2020-12-06 2020-12-15 2021-06-04 enabling environment reviewing the College Building Selection Designs ET-MOSHE - ET-234036-CS- Individual INDV / TVET Specialist- Creating national TVET Under IDA / 63350 Post Consultant Limited 14,400.00 0.00 2021-05-16 2021-05-17 2021-05-21 2021-06-11 2021-07-16 2022-01-12 recruitment of TVET specialist enabling environment Implementation Selection for the NPCU ET-MOSHE - ET-234043-CS- Individual INDV / M&E Specialist- Creating national TVET Under IDA / 63350 Post Consultant Open 20,000.00 0.00 2021-05-12 2021-05-17 2021-06-30 2021-07-21 2021-08-25 2022-02-21 recruitment of M&E specialist enabling environment Implementation Selection at the NPCU level ET-MOSHE - ET-234849-CS- Individual Creating national TVET Under INDV / Procurement Officer IDA / 63350 Prior Consultant Open 21,000.00 0.00 2021-05-24 2021-06-03 2021-07-12 2021-08-02 2021-09-06 2022-09-01 enabling environment Implementation Selection Selection ET-MOSHE - ET-239009-CS- Individual INDV / Construction Finance Creating national TVET Pending IDA / 63350 Post Consultant Open 12,000.00 0.00 2021-06-18 2021-07-08 2021-07-11 2021-07-21 2021-07-26 Training Individual Consultant enabling environment Implementation Selection Selection Page 3 SUMMARY O F PROCUREMENT PLAN Project Preparation Advancement (PPA) Project information: Harmonizing and Improving Statistics in West Africa Project -P169265 Project Implementation agency: Liberia Institute of Statistics and Geo- Information Services (LISGIS) Date of the Procurement Plan: February 3, 2020 Period covered by this Procurement Plan: 3rd February to 31st July 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 1, 2016), revised in November 2017, and August 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the Regional Project for Statistics Thresholds*, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] All contracts at or above USD Open Competition 5,000,000 are subject to International Market 1 Works C ≥ 5,000,000 Approach and Direct international advertising and the use of the Bank’s SPDs (or other Contracting documents agreed with the Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Bank). Open Competition National Market 200,000 < C < 5,000,000 None Approach C ≤ 200,000 RfQ None All contracts at or above USD Open Competition 500,000 are subject to International Market international advertising and the C ≥ 500,000 Approach and Direct use of the Bank’s SPDs (or other Goods, IT and Contracting documents agreed with the 2 non-consulting Bank). services Open Competition 100,000 < C < 500,000 National Market None Approach C ≤ 100,000 RfQ None All contracts at or above USD 100,000 are subject to for international advertising and the C < 100,000 Consulting Services use of the Bank’s SPDs (or other National documents agreed with the shortlist for Bank). 3 selection of All contracts at or above USD consultant firms for 200,000 are subject to Engineering and international advertising and the C ≤ 200,000 Construction use of the Bank’s SPDs (or other Supervision documents agreed with the Bank). Selection of All values ≥ 100,000 4 Individual All Approaches consultants Training, This line activity is not subject to Workshops, Based on approved Procurement Review However, 5 Study Tours All Values Annual Work Plan & each of the activities will be Budgets (AWPB) by TTL cleared with the TTL prior to its implementation. (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will be need for prequalification in the procurement arrangements under this Regional Project *These thresholds are for the purposes of the initial procurement plan for the PPA and for first 18 months. The thresholds will be revised periodically based on re- assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The LISGIS Project Management Team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Works There are no works under the Project Preparation Advance Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procurement Prequ Nation Revie Expecte Expecte Comment No. (Description) Cost Method alifica al w d bid d s US$ tion Prefer by opening Contrac (yes/n ence Bank date t o) (yes/n (Prior Signatu o) / Post) re Date 1 Procurement of 4 12,100 laptops, 3 No. all- in-1 printers, Limited, RFQ No No Post 28 Feb 4 Mar office desks, a 20 20 projector, metal filing cabinet, and stationery and supplies for project management Consultancy Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimate Selection Review Expecte Expected Expected Comments No. Assignment d Method/ by Bank d date Contract Completi Cost in Arrangem (Prior / of Signatur on US$ ent Post) proposal e Date submissi Date on 1. Recruitment of a Consultant to draft and validate 10,000 INDV Post 16 Mar 10 Apr 23 Apr ToR to be curricula of the 20 20 20 submitted to IDA Statistics degree & for Review and No CEST Program at Objection. the UL 2. Recruitment of a ToR, performance Financial evaluation, draft Management contract and Officer for Project DS Prior 10 Feb 21 Feb 31 Aug minutes of Management 20 20 20 contract negotiation to be submitted to IDA for Review and No 15,600 Objection. 3. ToR, performance evaluation, draft Recruitment of a contract and Procurement DS Prior 10 Feb 21 Feb 31 Aug minutes of Specialist for 20 20 20 contract Project 18,000 negotiation to be Management submitted to IDA for Review and No Objection. Training and Workshop (Training & Workshop activities are subject to TTL clearance). Estimat Estimated Expected Ref. Training, workshop and ed Cost Duration Training/workshop No. study tours in (Days) Date (US$) Conduct of validation 54,000 workshop and TOT for the GP Feb. 20 to March 1. on the design of 13 2020 questionnaires and enumeration training manual Workshop for cartographic 150,000 Feb. 24 to March 2. field staff training 16 2020 Workshop for enumeration 113,900 3. mapping training April 15, 2020 Study Tours to regional 32,000 countries for first-hand experience on regional March to April 4. harmonization of data 2020 collection, management and communication Workshops on current 50,000 administrative data across 5. April to July 2020 MACs and LISGIS regional offices Workshop to strengthen and 35,000 6. develop institutional capacity April to July 2020 of NSO Workshops for steering 40,000 7. committee on Administrative April to July 2020 Data Workshop for Project 10,000 Steering/Technical 8. Committees for annual work February 2020 plan preparation, review and validation GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) communication technology (including, without limitation, internet and telephone; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance; (iv) maintenance of equipment; (v) photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Western Africa : Harmonizing and Improving Statistics in West Africa PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2020-03-22 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169265 GPN Date: 2021-05-19 Project Name: Harmonizing and Improving Statistics in West Africa Loan / Credit No: IDA / 65730, IDA / 65760 H Executing Agency(ies): armonizing and Improving Statistics in West Africa - Ghana WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/TPFB/05 Collection, Quality Request for Single Stage - One /20 / Supply of Field bags for IDA / 65730 Post Open - National 0.00 Canceled 2020-02-14 2020-03-15 2020-04-14 Improvement, Dissemination Quotations Envelope trial census PES - 70 pcs and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/TPRC/0 Collection, Quality Request for Single Stage - One 4/20 / Supply of Rain coats IDA / 65730 Post Open - National 0.00 Canceled 2020-02-16 2020-03-22 2020-05-21 Improvement, Dissemination Quotations Envelope for trial census PES - 70 and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PPA/TPRJ/07 Harmonization, Data /20 / Supply of Reflective Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2020-02-14 2020-03-04 2020-04-03 Jackets for trial census PES - Improvement, Dissemination Quotations Envelope 70 pcs and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/TPBC/08 Collection, Quality Request for Single Stage - One /20 / Supply of Branded Caps IDA / 65730 Post Open - National 0.00 Canceled 2020-02-16 2020-03-29 2020-06-27 Improvement, Dissemination Quotations Envelope for trial census PES - 70 pcs and Use of Core Social and Economic Statistics GP/GSS/HISWAP/PPA/TPTM/0 Regional component: 9/20 / Training Materials for Harmonization, Data Trial Census PES (Manuals - Collection, Quality Request for Single Stage - One 70, Flip Charts -5, Markers- IDA / 65730 Post Open - National 0.00 Canceled 2020-02-14 2020-03-09 2020-03-18 Improvement, Dissemination Quotations Envelope 5, Chalks-5pkt, Pens - and Use of Core Social and 5pkt,Notepads-70, Folders- Economic Statistics 70, ID Accessories -70, etc) Regional component: GP/GSS/HISWAP/PPA/MCBC/1 Harmonization, Data 0/20 / Supply of Branded Collection, Quality Single Stage - One Caps for Training field IDA / 65730 Post Request for Bids Open - National 66,898.35 Completed 2020-01-30 2020-01-17 2020-02-04 2020-03-05 2020-02-07 2020-03-26 2020-03-10 2020-04-30 2020-05-07 2020-08-28 2020-10-02 Improvement, Dissemination Envelope Practice and field work - and Use of Core Social and 70,000 pcs Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCNP/1 Harmonization, Data 1/20 / Supply of Notepad for Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 48,611.11 Completed 2020-02-04 2020-03-24 2020-05-07 2020-06-22 2020-09-23 Training of Census Improvement, Dissemination Quotations Envelope Enumerators - 70,000 and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCRC/1 Harmonization, Data 4/20 / Procurement of Collection, Quality Single Stage - One Raincoats for Training Field IDA / 65730 Post Request for Bids Open - National 315,030.42 Completed 2020-01-31 2020-01-16 2020-02-05 2020-03-06 2020-02-11 2020-03-27 2020-05-18 2020-05-01 2020-07-20 2020-07-30 2021-01-22 Improvement, Dissemination Envelope Practice and field work - and Use of Core Social and 70,000 Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCTB/1 Harmonization, Data 5/20 / Procurement of Collection, Quality Tablets for Census training, IDA / 65730 Prior Direct Selection Direct 0.00 Canceled 2020-01-30 2020-02-04 2020-03-03 2020-07-01 Improvement, Dissemination field practice and field work - and Use of Core Social and 20,000 pcs Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCRJ/1 Harmonization, Data 6/20 / Supply of Reflective Collection, Quality Single Stage - One Jackets for Census Training IDA / 65730 Post Request for Bids Open - National 164,205.04 Completed 2020-01-31 2020-02-17 2020-02-05 2020-03-06 2020-02-07 2020-03-27 2020-03-10 2020-05-01 2020-05-12 2020-08-29 2020-10-02 Improvement, Dissemination Envelope Field Practice and Field work - and Use of Core Social and 70,000 Economic Statistics GP/GSS/HISWAP/PPA/STN/17/ Project Management and Request for Single Stage - One 20 / Stationery for IDA / 65730 Post Open - National 0.00 Canceled 2020-04-04 2020-05-30 2020-06-29 Monitoring and Evaluation Quotations Envelope preparatory meetings Regional component: Harmonization, Data GP/HISWAP/GSS/MC/TAB/001 Collection, Quality /20 / Procurement of 35,000 IDA / 65730 Prior Direct Selection Direct 5,600,000.00 Signed 2020-02-07 2020-08-31 2020-02-10 2020-09-07 2020-03-05 2020-09-09 2020-04-24 Improvement, Dissemination Tablets and Power Banks and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/MC/TAB/002 Harmonization, Data /20 / Procurement of 35,000 Collection, Quality IDA / 65730 Prior Direct Selection Direct 3,159,800.00 Completed 2020-02-07 2020-08-31 2020-02-11 2020-09-09 2020-03-08 2020-09-11 2020-04-27 2020-10-13 Tablets and Power Banks Improvement, Dissemination under direct contracting and Use of Core Social and Economic Statistics Page 1 GP/HISWAP/GSS/DM/LP/003/ Country-Specific Component: 20 / Procurement of 800 Improving and modernizing Single Stage - One Laptops for training and IDA / 65730 Post Request for Bids Open - National 723,801.33 Completed 2020-02-07 2020-01-20 2020-02-12 2020-03-13 2020-02-10 2020-04-03 2020-03-17 2020-05-08 2020-06-15 2020-08-06 2020-12-22 physical and statistical Envelope Census Data Monitoring (High infrastructure End Xtra ) Regional component: GP/HISWAP/GSS/MC/FB/004/ Harmonization, Data 20 / Procurement of Fieldbags Collection, Quality Single Stage - One IDA / 65730 Post Request for Bids Open - National 273,391.54 Completed 2020-02-20 2020-03-04 2020-02-25 2020-03-26 2020-03-27 2020-04-16 2020-05-14 2020-05-14 2020-07-17 2020-08-12 2021-01-21 for Main Census field work - Improvement, Dissemination Envelope 62,000 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/PES/FB/034/ Harmonization, Data 20 / Procurement of Fieldbags Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2020-10-17 2020-11-28 2021-02-26 for PES CAPI and Manual - Improvement, Dissemination Quotations Envelope 300 and Use of Core Social and Economic Statistics Regional component: GH/GSS/HISWAP/GP/UN/TB/0 Harmonization, Data 1/20 / Procurement of Collection, Quality UN Agencies Tablets for Census training, IDA / 65760 Prior Direct 3,295,091.18 Completed 2020-09-21 2020-10-01 2020-09-26 2020-10-27 2020-10-29 2020-11-06 2021-02-26 2021-03-31 Improvement, Dissemination (Direct) field practice and field work - and Use of Core Social and 20,000 pcs Economic Statistics Country-Specific Component: GP/GSDP2/GSS/VEH/015/20 Improving and modernizing Single Stage - One / Procurement of Vehicles (For IDA / 65730 Prior Request for Bids Open - National 1,321,334.03 Signed 2020-11-30 2020-11-26 2020-12-05 2020-12-09 2021-01-04 2021-01-22 2021-01-25 2021-02-09 2021-03-01 2021-03-26 2021-05-30 physical and statistical Envelope GLSS -25, Pick ups - 6) infrastructure Regional component: CS/PHC/HISWAP/PHC/CC/004 Harmonization, Data /20 / Design, Supply and Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Canceled 2020-11-15 2020-12-14 2021-02-12 Installation of Call Center Improvement, Dissemination Quotations Envelope equipment and Use of Core Social and Economic Statistics GD/PHC/HISWAP/WLC/001/2 Regional component: 0 / Supply of Wireless LAN Harmonization, Data Controller and other Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 17,709.00 Completed 2020-10-21 2020-11-25 2020-10-16 2020-12-16 2020-12-18 equipment for the Improvement, Dissemination Quotations Envelope provisioning of 2020PHC and Use of Core Social and Tablets Economic Statistics Regional component: GP/GSS/HISWAP/PPA/MCID/0 Harmonization, Data 6/20 / Procurement of 70,000 Collection, Quality Single Stage - One ID Cards for Census IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2020-02-28 2020-03-04 2020-04-03 2020-04-17 2020-05-22 2020-08-20 Improvement, Dissemination Envelope Enumerators Training and and Use of Core Social and field work Economic Statistics Regional component: GP/HISWAP/MOTCA/TQ/031/ Harmonization, Data Pending 20 / Printing of Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2022-02-05 2022-05-22 2022-08-20 Questionnaires for Tourism Improvement, Dissemination Quotations Envelope on Arrival Receipt - 2,000 and Use of Core Social and Economic Statistics Regional component: GD/GSS/HISWAP/CP/WS/072/ Harmonization, Data 20 / Supply of additional Collection, Quality IDA / 65760 Prior Direct Selection Direct 0.00 Canceled 2021-05-31 2021-06-05 2021-07-10 2022-01-06 Digital Weighing Scales, and Improvement, Dissemination Spare Parts and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/CPI/WS/024/ Harmonization, Data 20 / Procurement of Digital Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 33,994.74 Completed 2021-09-05 2021-11-07 2021-04-08 2022-02-05 2021-05-27 Weighing Scale and Improvement, Dissemination Quotations Envelope Accessories for CPI and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/PPI/FL/022/2 Harmonization, Data 0 / Supply Logistics for Collection, Quality Request for Single Stage - One Fieldwork for Rebasing of PPI IDA / 65730 Post Open - National 0.00 Canceled 2021-10-05 2021-12-07 2021-12-13 Improvement, Dissemination Quotations Envelope (e.g. satchels, pencils, and Use of Core Social and clipboards, etc.) Economic Statistics Regional component: GP/HISWAP/GSS/NA/AOC/011 Harmonization, Data Pending /20 / Procurement of One-in- Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-09-05 2021-10-31 2021-12-30 all desktop computers for Improvement, Dissemination Quotations Envelope on National Accounts - 10 pcs and Use of Core Social and Economic Statistics GP/HISWAP/GSS/RE/019/20 / Country-Specific Component: Pending Recording Equipment (Digital Improving and modernizing Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2022-03-05 2022-05-07 2022-07-06 Camera - 2, Video Camera - physical and statistical Quotations Envelope on 2, Voice Recorder - 3) infrastructure GP/HISWAP/GSS/MC/VEH/005 Country-Specific Component: /20 / Procurement of vehicles Improving and modernizing Single Stage - One IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2022-03-31 2022-04-05 2022-05-05 2022-05-26 2022-06-30 2022-09-28 for 2020PHC (Robust 4X4-16, physical and statistical Envelope Saloon-5) infrastructure GP/HISWAP/GSS/GLSS8/DS/03 Country-Specific Component: 8/20 / Procurement of Market Improving and modernizing Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2022-09-05 2022-10-24 2023-01-22 Digital Scales for GLSS8 - 130 physical and statistical Quotations Envelope pcs infrastructure Country-Specific Component: GP/HISWAP/GSS/SWC/021/20 Pending Improving and modernizing Request for Single Stage - One / Supply and Fixing of Swivel IDA / 65730 Post Open - National 0.00 Implementati 2021-12-05 2022-02-06 2022-04-07 physical and statistical Quotations Envelope Chairs - 70 pieces on infrastructure Country-Specific Component: GP/HISWAP/GSS/CT/018/20 Pending Improving and modernizing Request for Single Stage - One / Procurement of Car Tyres IDA / 65730 Post Open - National 0.00 Implementati 2021-10-30 2022-01-01 2022-03-02 physical and statistical Quotations Envelope for HISWAP - 30 pieces on infrastructure Page 2 Country-Specific Component: GP/HISWAP/GSS/DDE/020/20 Improving and modernizing Single Stage - One / Procurement of Document IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2021-11-30 2021-12-05 2022-01-04 2022-01-25 2022-03-01 2022-05-30 physical and statistical Envelope Digitization Equipment infrastructure Country-Specific Component: GP/HISWAP/GSS/GLSS8/FDC/ Improving and modernizing Request for Single Stage - One 04020 / Furnishing of Data IDA / 65730 Post Open - National 0.00 Canceled 2022-03-05 2022-04-16 2022-07-15 physical and statistical Quotations Envelope Processing Centre infrastructure Regional component: GP/GSS/HISWAP/PPA/PB/BC/2 Harmonization, Data 0/20 / Supply of Branded Collection, Quality Request for Single Stage - One Caps for Census Official for IDA / 65730 Post Open - National 0.00 Canceled 2021-01-06 2021-03-03 2021-06-01 Improvement, Dissemination Quotations Envelope publicity and launching - and Use of Core Social and 3,900 pcs Economic Statistics Regional component: Harmonization, Data GP/HISWAP/MOE/BPD/028/20 Pending Collection, Quality Request for Single Stage - One / Procurement of Branded Pen IDA / 65730 Post Open - National 0.00 Implementati 2022-03-05 2022-04-30 2022-05-09 Improvement, Dissemination Quotations Envelope Drives - 300 on and Use of Core Social and Economic Statistics GP/HISWAP/GSS/GLSS8/CT/0 Project Management and Request for Single Stage - One 45/20 / Procurement of Car IDA / 65730 Post Open - National 0.00 Canceled 2022-05-04 2022-07-06 2022-09-04 Monitoring and Evaluation Quotations Envelope Tyre for GLSS8 - 570 pcs Regional component: GP/GSS/HISWAP/PPA/MCF/12 Harmonization, Data /20 / Supply of Folders for Collection, Quality Single Stage - One IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2021-01-11 2021-01-16 2021-02-15 2021-03-08 2021-04-12 2021-07-11 Training of Census Improvement, Dissemination Envelope Enumerators - 70,000 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/IBES/LF/042/ Harmonization, Data 20 / Procurement of Field Collection, Quality Request for Single Stage - One Logistics for IBES Fieldwork IDA / 65730 Post Open - National 0.00 Canceled 2022-04-05 2022-05-31 2022-08-29 Improvement, Dissemination Quotations Envelope (e.g. satchels, pencils, and Use of Core Social and clipboards, etc.) Economic Statistics Regional component: Harmonization, Data GP/HISWAP/GSS/IBES/IR/046/ Collection, Quality Request for Single Stage - One 20 / Printing of IBES Reports IDA / 65730 Post Open - National 0.00 Canceled 2021-12-20 2022-02-07 2022-02-16 Improvement, Dissemination Quotations Envelope (employment, job creation etc) and Use of Core Social and Economic Statistics GP/HISWAP/GSS/GLSS8/L&S/0 Regional component: 36/20 / Procurement of Harmonization, Data Logistics and Stationery for Collection, Quality Request for Single Stage - One GLSS8 fieldwork and mapping IDA / 65730 Post Open - National 0.00 Canceled 2021-10-05 2021-11-23 2022-02-21 Improvement, Dissemination Quotations Envelope activities (Raincoats, and Use of Core Social and fieldbags, solar lamp, field Economic Statistics boots etc) Regional component: Harmonization, Data GP/HISWAP/MOH/HSR/029/2 Pending Collection, Quality Request for Single Stage - One 0 / Printing of Health Survey IDA / 65730 Post Open - National 0.00 Implementati 2022-03-05 2022-04-30 2022-07-29 Improvement, Dissemination Quotations Envelope Report -200 on and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/HISWAP/MOTCA/TRP/032 Collection, Quality Request for Single Stage - One /20 / Printing of Tourism IDA / 65730 Post Open - National 0.00 Canceled 2022-07-05 2022-08-23 2022-11-21 Improvement, Dissemination Quotations Envelope Report - 200 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/IBES/QM/043 Harmonization, Data /20 / Printing of Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2022-03-05 2022-04-30 2022-05-01 Questionnaires and Manuals Improvement, Dissemination Quotations Envelope for IBES - 8,000 for IBES and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/IBES/LE/044/ Harmonization, Data 20 / Procurement of Logistics Collection, Quality Request for Single Stage - One and Equipment for or IBES ( IDA / 65730 Post Open - National 0.00 Canceled 2022-03-05 2022-04-23 2022-07-22 Improvement, Dissemination Quotations Envelope Toners 10, External Drives - and Use of Core Social and 4, A4 Ppapers - 300 bx Economic Statistics Regional component: Harmonization, Data GP/HISWAP/GSS/MC/PR/035/ Pending Collection, Quality Request for Single Stage - One 20 / Printing of Census IDA / 65730 Post Open - National 0.00 Implementati 2022-01-05 2022-02-16 2022-05-17 Improvement, Dissemination Quotations Envelope Reports on and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/BDR/RF/026/20 Harmonization, Data Pending / Printing and delivery of Birth Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2022-04-04 2022-05-23 2022-08-21 and Death Registeration Improvement, Dissemination Quotations Envelope on Forms - 103,000 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/IBES/PF/041/ Harmonization, Data 20 / Printing of Posters - Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2022-06-05 2022-07-31 2022-10-29 5000, and Flyers - 10,000 for Improvement, Dissemination Quotations Envelope IBES and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/BDR/HS/033/20 Harmonization, Data Pending / Printing of Hologram Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2022-07-05 2022-08-23 2022-11-21 Stickers for Birth and Death - Improvement, Dissemination Quotations Envelope on 100,000 and Use of Core Social and Economic Statistics Page 3 GP/HISWAP/GIS/FSU/030/20 Country-Specific Component: / Furnishing of Statistics Units Pending Improving and modernizing Request for Single Stage - One of Ghana Immigration IDA / 65730 Post Open - National 0.00 Implementati 2022-07-05 2022-08-16 2022-11-14 physical and statistical Quotations Envelope statistical offices across the on infrastructure country GP/HISWAP/GSS/GLSS8/IE/03 Regional component: 9/20 / Procurement of IT Harmonization, Data Equipment for or GLSS8 Collection, Quality Request for Single Stage - One (Notebook Computers - 30, IDA / 65730 Post Open - National 0.00 Canceled 2022-07-05 2022-08-23 2022-11-21 Improvement, Dissemination Quotations Envelope Power Banks - 160, CDR-500, and Use of Core Social and External Drives - 30, Flash Economic Statistics Drives - 500) Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/SM/19/ Collection, Quality Request for Single Stage - One 20 / Printing of Supervisors IDA / 65730 Post Open - National 0.00 Canceled 2021-01-23 2021-02-20 2021-03-22 Improvement, Dissemination Quotations Envelope Manuals - 18,400 and Use of Core Social and Economic Statistics Country-Specific Component: GP/HISWAP/GSS/AC/016/20 Pending Improving and modernizing Request for Single Stage - One / Supply and Fixing of 80 Air- IDA / 65730 Post Open - National 0.00 Implementati 2021-09-05 2021-11-07 2022-02-05 physical and statistical Quotations Envelope conditioners on infrastructure GP/GSS/HISWAP/PPA/LP/03/2 Country-Specific Component: 0 / Procurement of 124 Improving and modernizing Laptops for training and use IDA / 65730 Post Request for Bids 0.00 Canceled 2021-03-15 2021-03-20 2021-04-19 2021-05-03 2021-05-31 2021-08-29 physical and statistical by 552 Census Data Monitors infrastructure (High End Xtra ) Regional component: GSS/HISWAP/GP/CTQ/RFQ/00 Harmonization, Data 2/21 / Printing of Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Canceled 2021-06-05 2021-07-10 2021-08-09 questionnaires for 20121PHC Improvement, Dissemination Quotations Envelope main training and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PPA/PM/18/ Collection, Quality Single Stage - One 20 / Printing of Field Officers IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2021-05-31 2021-06-05 2021-07-05 2021-07-26 2021-08-30 2021-10-19 Improvement, Dissemination Envelope Manuals - 80,000 and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GIS/HISWAP/DMS/39/21 Pending Collection, Quality Single Stage - One / Procurement of Digital IDA / 65760 Post Request for Bids Open - National 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2021-10-29 Improvement, Dissemination Envelope Mobile Shelve on and Use of Core Social and Economic Statistics GP/HISWAP/GSS/MDA/VEH/04 Country-Specific Component: Under 0/21 / Procurement of Improving and modernizing Single Stage - One IDA / 65760 Post Request for Bids Open - National 0.00 Implementati 2021-07-30 2021-05-11 2021-08-04 2021-05-12 2021-09-15 2021-10-15 2021-11-19 2022-05-18 vehicles for HISWAP (Pickups- physical and statistical Envelope on 7, Mobile Registration Van-8) infrastructure Regional component: GP/HISWAP/GSS/CPI/LP/016/ Harmonization, Data Pending 21 / Procurement of Laptop Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 computers with high speed Improvement, Dissemination Quotations Envelope on processor - 3 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/MC/FST/007 Harmonization, Data /20 / Printing of Stickers for Collection, Quality Single Stage - One IDA / 65730 Post Request for Bids Open - National 0.00 Canceled 2021-05-31 2021-06-05 2021-07-05 2021-07-26 2021-08-30 2021-09-08 Main Census field work - Improvement, Dissemination Envelope 5,000,000 and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/MOE/ASCQ/027/ Harmonization, Data 20 / Printing and delivery Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 41,582.13 Signed 2021-04-20 2021-06-22 2021-05-04 2021-12-19 questionnaires for Annual Improvement, Dissemination Quotations Envelope School Census - 53688 and Use of Core Social and Economic Statistics GP/HISWAP/GSS/SOL/012/20 / Procurement of Stationery and office logistics for HISWAP Project Management and Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Canceled 2021-05-04 2021-05-24 2021-06-23 activities ( A4 Sheets, Pens, Monitoring and Evaluation Quotations Envelope Toners, Note pads, Arc Files etc) GP/GSS/HISWAP/PPA/CA/01/ 20 / Computers and Accessories to set up Census Country-Specific Component: offices (Desktop computers- Improving and modernizing Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Canceled 2021-06-05 2021-07-24 2021-10-22 18, Workstation-4 UPS-18 physical and statistical Quotations Envelope printers-8, Toners-100, infrastructure External Drive-90, Copier Toners - 20, Flash Drives-70) GP/HISWAP/GSS/PHC/LDC/01 Country-Specific Component: Under 8/21 / Procurement of Improving and modernizing Single Stage - One IDA / 65760 Post Request for Bids Open - National 0.00 Implementati 2021-06-30 2021-05-10 2021-07-11 2021-05-12 2021-08-10 2021-09-09 2021-10-14 2021-12-13 Laptops - 312 units for 2021 physical and statistical Envelope on PHC infrastructure Regional component: GP/GSS/HISWAP/PPA/PB/BPS/ Harmonization, Data 20/20 / Supply of Branded Under Collection, Quality Request for Polo Shirts and Polo Caps for IDA / 65730 Post 0.00 Implementati 2021-06-12 2021-07-24 2021-10-22 Improvement, Dissemination Quotations Census Official for publicity on and Use of Core Social and and launching - 5,000 pcs Economic Statistics Regional component: GD/GSS/HISWAP/PHCL/CK/00 Harmonization, Data 1/21 / Procurement of Chalks Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 92,040.66 Signed 2021-05-08 2021-06-10 2021-05-27 2021-06-13 for 2021PHC Listing Activities Improvement, Dissemination Quotations Envelope - 2,600 boxes and Use of Core Social and Economic Statistics Page 4 GP/HISWAP/GSS/ITE/014/20 / Procurement IT Equipment Country-Specific Component: for GSDP (Computers and UPS Pending Improving and modernizing Single Stage - One -203, Laptops -130, Servers - IDA / 65730 Post Request for Bids Open - National 0.00 Implementati 2021-08-20 2021-08-25 2021-09-24 2021-10-15 2021-11-19 2022-03-19 physical and statistical Envelope 21, Printers - 78, Scanners - on infrastructure 50, Photocopiers - 47, EHD - 102, Projectors - 40 ) Regional component: GP/HISWAP/GSS/DP/DKC/013 Harmonization, Data Under /20 / Procurement of High Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-06-05 2021-07-31 2021-09-29 End Laptop Computers for Improvement, Dissemination Quotations Envelope on PHC Data Processing - 10 pcs and Use of Core Social and Economic Statistics GP/GSS/HISWAP/PHC/PTM/00 Regional component: 2/21 / Printing of Training Harmonization, Data materials for 2021PHC Collection, Quality Request for Single Stage - One Regional training IDA / 65760 Post Open - National 81,590.21 Signed 2021-05-07 2021-06-09 2021-05-27 2021-06-23 Improvement, Dissemination Quotations Envelope (Questionnaires - 9,500, and Use of Core Social and Trainers Guide - 8,000, Economic Statistics Manuals - 9,500). Regional component: GP/HISWAP/GSS/CPI/WS/023/ Harmonization, Data Pending 20 / Procurement of CPI work Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-10-05 2021-12-07 2022-03-07 station with video conference Improvement, Dissemination Quotations Envelope on facilities and Use of Core Social and Economic Statistics GP/GSS/HISWAP/PPA/MCMT/1 Regional component: 3/20 / Materials for field work Harmonization, Data and training of Census Under Collection, Quality Request for Single Stage - One Enumerators (Flip Charts - IDA / 65730 Post Open - National 0.00 Implementati 2021-07-05 2021-08-30 2021-11-28 Improvement, Dissemination Quotations Envelope 1,900 pieces, A4 Papers - 562 on and Use of Core Social and boxes, Markers - 10,000 pcs, Economic Statistics Pens - 1,470pkts etc) GP/HISWAP/GSS/PPE/PHC/RT/ 09/21 / Procurement of PPEs Regional component: and Sanitary items for Harmonization, Data 2021PHC Regional Training Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 6,518.00 Signed 2021-06-05 2021-07-10 2021-06-07 2021-07-31 activities (Face mask - 1,280 Improvement, Dissemination Quotations Envelope pkts, sanitizers - 100 gallons, and Use of Core Social and Tissue papers - 2,912packs Economic Statistics etc) Regional component: GP/HISWAP/GSS/MC/PB/010/ Harmonization, Data Under 20 / Printing of Banners for Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2020-02-14 2020-03-18 2020-04-17 2021PHC Publicity and Improvement, Dissemination Quotations Envelope on Education - 2,750 pcs and Use of Core Social and Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PHC/OTG/10 Collection, Quality Request for Single Stage - One /21 / Procurement of OTG IDA / 65760 Post Open - National 7,997.65 Signed 2021-07-05 2021-08-12 2021-05-26 2021-08-26 Improvement, Dissemination Quotations Envelope flash drives - 816 pieces and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/PHC/CCS/01 Harmonization, Data 1/21 / Supply, Design and Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 14,102.39 Signed 2021-06-05 2021-07-17 2021-06-14 2021-08-07 installation of Call Centre Improvement, Dissemination Quotations Envelope Services for 2021HC and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/FM/012 Harmonization, Data /21 / Procurement of Face Under Collection, Quality Request for Single Stage - One Masks for 2021PHC main IDA / 65760 Post Open - National 0.00 Implementati 2021-07-05 2021-09-06 2021-09-20 Improvement, Dissemination Quotations Envelope training of the field officers - on and Use of Core Social and 15,300 packets Economic Statistics GP/HISWAP/GSS/PHC/HSLS/0 Regional component: 13/21 / Procurement of Hand Harmonization, Data Under Sanitizers - 76500 bottles Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-20 2021-08-13 2021-08-27 (200ml) and Liquid soaps - Improvement, Dissemination Quotations Envelope on 65,500 gallons for 2021PHC and Use of Core Social and Main training - Economic Statistics GP/HISWAP/GSS/PHC/TS/014 Regional component: /21 / Procurement of Tissue Harmonization, Data Under Papers for (drying of hands) Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-20 2021-08-13 2021-08-27 for 2021PHC main training of Improvement, Dissemination Quotations Envelope on the field officers - 3,160 and Use of Core Social and packets Economic Statistics Regional component: GP/HISWAP/GSS/PHC/TRL/01 Harmonization, Data 5/21 / Procurement of T - Pending Collection, Quality Request for Single Stage - One Rolls for 2021PHC main IDA / 65760 Post Open - National 0.00 Implementati 2021-08-04 2021-09-27 2021-10-11 Improvement, Dissemination Quotations Envelope training of field officers - on and Use of Core Social and 15,300 packets Economic Statistics Regional component: GP/HISWAP/GSS/MC/S&F/008 Harmonization, Data /20 / Printing of Brochures - Under Collection, Quality Request for Single Stage - One 200,000 copies, Stickers - IDA / 65730 Post Open - National 0.00 Implementati 2021-06-07 2021-08-09 2021-08-23 Improvement, Dissemination Quotations Envelope 100,000 copies for Census on and Use of Core Social and Publicity and Education Economic Statistics Regional component: Harmonization, Data GP/GSS/HISWAP/PHC/CBC/00 Under Collection, Quality Request for Single Stage - One 6/21 / Printing and Supply of IDA / 65760 Post Open - National 0.00 Implementati 2021-06-05 2021-07-31 2021-08-14 Improvement, Dissemination Quotations Envelope Call back cards for 2021PHC on and Use of Core Social and Economic Statistics GP/HISWAP/MOE/PR/038/21 Regional component: / Printing of questionnaires Harmonization, Data for Ministry of Education Pending Collection, Quality Request for Single Stage - One Annual School Census (Basic, IDA / 65760 Post Open - National 0.00 Implementati 2021-09-05 2021-10-31 2021-11-30 Improvement, Dissemination Quotations Envelope SHS, Technical, Management) on and Use of Core Social and for 216 Districts - 93,000 Economic Statistics copies Page 5 Regional component: GD/PHC/HISWAP/PID/001/20 Harmonization, Data Under / Printing of ID Cards for Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-06 2021-08-01 2021-08-22 2021PHC Enumerators and Improvement, Dissemination Quotations Envelope on Supervisors and Use of Core Social and Economic Statistics Regional component: GP/HISWAP/GSS/MC/PP/009/ Harmonization, Data Under 20 / Printing of Poster for Collection, Quality Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-06-06 2021-07-28 2021-08-18 Main Census Publicity and Improvement, Dissemination Quotations Envelope on Education - 100,000 pcs and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/CT/003 Harmonization, Data Under /21 / Procurement of Car Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-25 2021-08-27 2021-09-17 Tyres and batteries foe Improvement, Dissemination Quotations Envelope on Census field work operations and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/CCTV/CC/PH Harmonization, Data Under C/012/21 / Supply and Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 4,629.27 Implementati 2021-06-12 2021-08-12 2021-09-02 Installation of CCTV at the Improvement, Dissemination Quotations Envelope on 2021PHC Call Center and Use of Core Social and Economic Statistics Country-Specific Component: GP/HISWAP/GSS/SFTA/017/2 Pending Improving and modernizing Request for Single Stage - One 0 / Procurement of Software - IDA / 65730 Post Open - National 0.00 Implementati 2022-01-05 2022-03-09 2022-06-07 physical and statistical Quotations Envelope 15 and Antivirus - 38 on infrastructure Regional component: GP/HISWAP/GSS/PHC/PCM/01 Harmonization, Data Pending 5/21 / Supply of Packing and Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-12-22 2022-01-24 2022-02-23 Covering Materials and for Improvement, Dissemination Quotations Envelope on 2021 PHC and Use of Core Social and Economic Statistics GP/GSS/HISWAP/PO/ITE/015/ 21 / Procurement of ICT equipment for HISWA Project Pending Project Management and Request for Single Stage - One offices (Laptops - 10 units, IDA / 65760 Post Open - National 0.00 Implementati 2021-10-05 2021-11-21 2021-12-21 Monitoring and Evaluation Quotations Envelope Printers - 5 units, Scanners - on Photocopies - 2, Com-biding Machine - 3) Regional component: GP/GSS/HISWAP/PHC/FB/016/ Harmonization, Data Pending 21 / Procurement of Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-25 2021-07-29 2021-08-12 Additional Field Bags for Improvement, Dissemination Quotations Envelope on 2021PHC - 5,000 pieces and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/NP/017 Harmonization, Data /21 / Procurement of Pending Collection, Quality Request for Single Stage - One Additional Notepads for IDA / 65760 Post Open - National 0.00 Implementati 2021-06-26 2021-08-05 2021-08-19 Improvement, Dissemination Quotations Envelope 2021PHC Field work - 5,000 on and Use of Core Social and units Economic Statistics Regional component: GP/GSS/HISWAP/PHC/ALP/01 Harmonization, Data Pending 8/21 / Procurement Collection, Quality IDA / 65760 Post Direct Selection Direct 0.00 Implementati 2021-06-17 2021-06-22 2021-07-25 2021-08-08 Additional laptops for Improvement, Dissemination on 2021PHC Data processing and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/ATB/01 Harmonization, Data 9/21 / Procurement of Pending Collection, Quality Additional Tablets for IDA / 65760 Post Direct Selection Direct 0.00 Implementati 2021-06-15 2021-06-20 2021-07-16 2021-08-15 Improvement, Dissemination 2021PHC field work - 7,000 on and Use of Core Social and units Economic Statistics Regional component: GP/GSS/HISWAP/PHC/EC/019 Harmonization, Data /21 / Printing of 2021PHC Pending Collection, Quality Request for Single Stage - One Certificate of Enumeration for IDA / 65760 Post Open - National 0.00 Implementati 2021-06-25 2021-08-25 2021-09-08 Improvement, Dissemination Quotations Envelope Census Night - 500,000 on and Use of Core Social and copies Economic Statistics GP/GSS/HISWAP/PPA/OC/02/ 20 / Office equipment and Consumables to set up Census Offices (Office Desk & Country-Specific Component: Pending Swivel Chairs -20, Desk Trays- Improving and modernizing Request for Single Stage - One IDA / 65730 Post Open - National 0.00 Implementati 2021-10-05 2021-11-30 2021-12-30 32, Computers - 5 Perforaters physical and statistical Quotations Envelope on 20, Staplers - 50, Staple Pins infrastructure - 50Pkt, Externa HD- 5, Arc Files -100, Shredders - 10, Kettles -5, etc) Regional component: GP/GSS/HISWAP/PHC/PAM/02 Harmonization, Data Pending 0/21 / Printing of additional Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-25 2021-08-18 2021-09-01 field officer's manual to be Improvement, Dissemination Quotations Envelope on used as on the field - 5,000 and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/FL/022/ Harmonization, Data Pending 21 / Printing of Flyers for Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-23 2021-08-02 2021-09-01 2021PHC School Census Improvement, Dissemination Quotations Envelope on Programme - 50,000 copies and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/ARJ/023 Harmonization, Data /21 / Procurement of Pending Collection, Quality Request for Single Stage - One additional Reflective Jackets IDA / 65760 Post Open - National 0.00 Implementati 2021-07-05 2021-08-14 2021-09-13 Improvement, Dissemination Quotations Envelope for 2021PHC Enumerators - on and Use of Core Social and 5,000 pieces Economic Statistics Page 6 Regional component: GP/GSS/HISWAP/PHC/NM/025 Harmonization, Data Pending /21 / Procurement Nose Mask Collection, Quality Request for Single Stage - One IDA / 65760 Post Open - National 0.00 Implementati 2021-06-30 2021-08-09 2021-09-08 for 2021PHC Field work - Improvement, Dissemination Quotations Envelope on 100,000 boxes and Use of Core Social and Economic Statistics Regional component: GP/GSS/HISWAP/PHC/HS/026 Harmonization, Data /21 / Procurement of Hand Pending Collection, Quality Request for Single Stage - One Sanitizers (100ml) for IDA / 65760 Post Open - National 0.00 Implementati 2021-06-30 2021-08-09 2021-09-08 Improvement, Dissemination Quotations Envelope 2021PHC field work - 50,000 on and Use of Core Social and bottles Economic Statistics NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: Harmonization, Data GSS/HISWAP/NC/PCI/DS/001/ Collection, Quality 21 / Engagement of Public IDA / 65760 Prior Direct Selection Direct 137,465.39 Signed 2021-01-04 2020-12-25 2021-01-09 2021-01-29 2021-01-30 2021-02-18 2021-02-20 Improvement, Dissemination Cloud Infrastructure Provider and Use of Core Social and Economic Statistics CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: CS/HISWAP/GSS/DBCI/012/20 Harmonization, Data / Designing and building of a Consultant Collection, Quality resilient and reliable private IDA / 65760 Post Qualification Open - National 0.00 Canceled 2020-10-16 2020-03-03 2020-11-06 2020-12-04 2020-10-06 2021-01-03 2021-01-31 2021-04-01 Improvement, Dissemination cloud infrastructure for GSS to Selection and Use of Core Social and support Censuses and Surveys Economic Statistics INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: Harmonization, Data CS/HISWAP/GSS//PHC/CP/00 Individual Collection, Quality 2/20 / Consultant to develop IDA / 65730 Post Consultant Open 9,438.01 Signed 2020-02-07 2019-10-15 2020-03-11 2019-12-20 2020-03-25 2019-12-20 2020-04-15 2019-12-20 2020-07-14 Improvement, Dissemination Citizen Platform Selection and Use of Core Social and Economic Statistics Regional component: Harmonization, Data CS/HISWAP/GSS//PHC/CC/00 Individual Collection, Quality 4/20 / Consultant to establish IDA / 65730 Post Consultant Open 0.00 Canceled 2020-02-28 2020-04-01 2020-04-15 2020-05-13 2020-08-11 Improvement, Dissemination 2020 PHC Call Center Selection and Use of Core Social and Economic Statistics Regional component: CS/HISWAP/GSS//PHC/LMS/0 Harmonization, Data Individual 03/20 / Consultant to Collection, Quality IDA / 65730 Post Consultant Open 9,438.01 Signed 2020-02-20 2020-01-07 2020-03-24 2020-03-10 2020-04-07 2020-03-11 2020-05-05 2020-03-16 2020-08-03 develop Logistics Improvement, Dissemination Selection Management Systems and Use of Core Social and Economic Statistics Regional component: Harmonization, Data CS/HISWAP/GSS//CPIS/005/2 Individual Collection, Quality 0 / Consultant to upgrade CPI IDA / 65730 Post Consultant 0.00 Canceled 2021-05-20 2021-06-24 2021-07-08 2021-08-12 2021-11-10 Improvement, Dissemination Software Selection and Use of Core Social and Economic Statistics Regional component: CS/HISWAP/GSS//PHC/EB/001 Harmonization, Data Individual /20 / Upgrade and deploy a Collection, Quality IDA / 65730 Post Consultant Open 13,663.54 Signed 2019-10-10 2020-09-09 2019-11-15 2020-10-14 2019-12-06 2020-10-29 2020-02-18 2020-11-17 2020-04-18 customized enumerators Improvement, Dissemination Selection bureau and Use of Core Social and Economic Statistics Regional component: Harmonization, Data CS/HISWAP/GIS/P/CAPI/010/ Individual Collection, Quality 20 / Consultant to develop IDA / 65730 Post Consultant Open 0.00 Canceled 2021-02-26 2021-04-16 2021-05-07 2021-06-11 2021-06-20 Improvement, Dissemination CAPI for data collection Selection and Use of Core Social and Economic Statistics Regional component: CS/HISWAP/GSS/AGRIS/SMP/0 Harmonization, Data 07/20 / Sampling Consultant Individual Collection, Quality Pending (International)- professional IDA / 65730 Post Consultant Open 0.00 2022-04-25 2022-05-28 2022-06-11 2022-07-09 2022-07-18 Improvement, Dissemination Implementation fees (remote sensing survey Selection and Use of Core Social and specialist) for AGRIS Economic Statistics Regional component: Harmonization, Data CS/HISWAP/GSS/CPI/RB/008/ Individual Collection, Quality Pending 20 / Consultant to Review the IDA / 65730 Post Consultant Open 0.00 2022-04-25 2022-05-28 2022-06-11 2022-07-09 2022-10-07 Improvement, Dissemination Implementation CPI Rebase (local) Selection and Use of Core Social and Economic Statistics Regional component: CS/HISWAP/MOGCSP/P/CAPI/ Harmonization, Data 011/20 / Consultant to Individual Collection, Quality Pending develop dissemination IDA / 65730 Post Consultant Open 0.00 2022-06-30 2022-08-18 2022-09-08 2022-10-13 2023-01-11 Improvement, Dissemination Implementation /communication Plan for Selection and Use of Core Social and Gender Statistics Economic Statistics Page 7 Regional component: Harmonization, Data CS/HISWAP/GSS/AGRIS/SMP/0 Individual Collection, Quality Pending 09/20 / Consultant to Review IDA / 65730 Post Consultant Open 0.00 2022-07-25 2022-08-27 2022-09-10 2022-10-15 2023-01-13 Improvement, Dissemination Implementation the PBCI Selection and Use of Core Social and Economic Statistics Regional component: CS/GSS/HISWAP/CSW/IND/00 Harmonization, Data Individual 1/21 / Consultancy for CSWeb Collection, Quality IDA / 65760 Post Consultant Open 26,055.29 Signed 2021-06-11 2021-04-20 2021-07-14 2021-05-19 2021-07-28 2021-05-31 2021-08-18 2021-05-21 2021-09-02 Server Implementation and Improvement, Dissemination Selection Deployment for 2021 PHC and Use of Core Social and Economic Statistics CS/HISWAP/GSS/SEEA/006/20 Regional component: / Consultant for Compilation Harmonization, Data of Environment Statistics Individual Collection, Quality Pending using SEEA on Forestry, IDA / 65730 Post Consultant Open 0.00 2021-09-30 2021-11-02 2021-11-16 2021-12-14 2022-03-14 Improvement, Dissemination Implementation Fisheries, Water, and Selection and Use of Core Social and Environmental goods and Economic Statistics services Page 8 PROCUREMENT PLAN (Textual Part) Project information: [West Bank and Gaza] [Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector (ASPIRE)] [P-170928] Project Implementation agency: [Palestinian Energy and Natural Resources Authority] Date of the Procurement Plan: [29-June-2020] Period covered by this Procurement Plan: [29-June-2020 – 28- December-2028] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [Domestic preference is not applicable for those contracts identified in the Procurement Plan tables]; Works: [Domestic preference is not applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is not Applicable. PROCUREMENT West Bank and Gaza : Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector in the West Bank and Gaza PLAN General Information Country: West Bank and Gaza Bank’s Approval Date of the Original Procurement Plan: 2020-08-31 Revised Plan Date(s): (comma delineated, leave blank if none) 2021-05-31 Project ID: P170928 GPN Date: 2020-10-25 Project Name: Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector in the West Bank and Gaza Loan / Credit No: TF / B3015, TF / B3036 P Executing Agency(ies): alestinian Energy and Natural Resources Authority WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GZ-PENRA-174777-GO-RFB Component 1: Improving / Upgrade of MV lines in Pending Infrastructure for Regional Single Stage - One 2022-04- TEDCO to supply additional TF / B3015 Post Request for Bids Open - International 1,000,000.00 0.00 Implementat 2021-04-15 2021-04-20 2021-06-19 2021-08-18 2021-10-08 Electricity Interconnections in Envelope 06 electricity from IEC (Phase #1) ion the West Bank and Gaza PEA WB - TDECO 01/2021 GZ-PENRA-176009-GO-RFB Component 1: Improving / Design, Supply, and Pending Infrastructure for Regional Single Stage - One 2024-04- Installation of MV line and TF / B3015 Post Request for Bids Open - International 2,500,000.00 0.00 Implementat 2021-12-12 2021-12-17 2022-01-16 2022-03-17 2022-05-05 Electricity Interconnections in Envelope 24 infrastructure between Jericho ion the West Bank and Gaza & Ramallah GZ-PENRA-176003-GO-RFB Component 1: Improving Pending / Upgrade of MV lines in Infrastructure for Regional Single Stage - One 2022-12- TF / B3015 Post Request for Bids Open - International 1,000,000.00 0.00 Implementat 2021-12-15 2021-12-20 2022-02-18 2022-04-19 2022-06-09 SELCO to supply additional Electricity Interconnections in Envelope 06 ion electricity from IEC (Phase #1) the West Bank and Gaza GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-PENRA-174770-GO-RFB / Supply and Installation of Component 3: Enabling Pending Single Stage - One rooftop solar systems in West TF / B3015 Private Sector Engagement in Post Request for Bids Open - International 1,500,000.00 0.00 Implementati 2020-12-15 2020-12-20 2021-02-03 2021-04-04 2021-05-25 2021-11-21 Envelope Bank Renewable Energy on PEA WB RF 02/2020 GZ-PENRA-174774-GO-RFB Component 3: Enabling Pending / Supply and Installation of Single Stage - One TF / B3015 Private Sector Engagement in Post Request for Bids Open - International 2,000,000.00 0.00 Implementati 2021-02-16 2021-02-21 2021-04-07 2021-06-06 2021-07-27 2022-01-23 rooftop solar systems in Gaza Envelope Renewable Energy on PEA WB RF 01/ 2021 GZ-PENRA-176007-GO-DIR Component 1: Improving / Rehabilitation of Tarqumia Infrastructure for Regional TF / B3036 Post Direct Selection Direct 950,000.00 819,123.69 Completed 2020-05-28 2019-11-11 2020-06-02 2020-03-04 2020-07-07 2020-05-21 2021-01-03 2020-06-04 Substation Electricity Interconnections in DS-PETL-EM-WB-20 the West Bank and Gaza GZ-PENRA-213250-GO-RFB Component 1: Improving Pending / Upgrade of MV lines in Infrastructure for Regional Single Stage - One TF / B3015 Post Request for Bids Open - National 500,000.00 0.00 Implementati 2021-06-15 2021-06-20 2021-08-19 2021-10-18 2021-11-22 2022-05-21 NEDCO to Supply Additional Electricity Interconnections in Envelope on Electricity from IEC the West Bank and Gaza GZ-PENRA-174554-GO-RFB / Supply of Smart Meters for EDISCOs in West Bank , Component 2: Improving including Advanced Metering Pending Sustainability of Service Single Stage - One Infrastructure (AMI) TF / B3036 Post Request for Bids Open - International 4,000,000.00 0.00 Implementati 2021-03-01 2021-03-31 2021-05-30 2021-07-29 2021-09-18 2022-03-17 Delivery in West Bank and Envelope comprising communication on Gaza DISCOs devices, software (MDMS) and a Metering Control Center (MCC) - (Phase #2) GZ-PENRA-174760-GO-RFB / Supply of Smart Meters for EDISCOs in Gaza, including Component 2: Improving Advanced Metering Pending Sustainability of Service Single Stage - One Infrastructure (AMI) TF / B3036 Post Request for Bids Open - International 3,000,000.00 0.00 Implementati 2022-06-01 2022-07-01 2022-08-30 2022-10-29 2023-01-27 2023-07-26 Delivery in West Bank and Envelope comprising communication on Gaza DISCOs devices, software (MDMS) and a Metering Control Center (MCC) - (Phase #2) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-PENRA-176013-CS-QCBS Component 4: Technical / Assessment for the Pipeline Quality And Cost- Pending TF / B3036 Assistance, Capacity Building Post Open - International 250,000.00 0.00 2021-05-31 2021-06-30 2021-08-13 2021-09-12 2021-10-12 2021-12-11 2022-01-31 2022-03-02 of the Energy Sector Projects Based Selection Implementation and Project Management in West Bank & Gaza GZ-PENRA-221765-CS-QCBS / Assessment of Sustainable Component 4: Technical Lead Acid Battery (ULAB) Quality And Cost- Under TF / B3036 Assistance, Capacity Building Post Open - National 80,000.00 0.00 2021-03-25 2021-04-04 2021-04-15 2021-05-20 2021-05-29 2021-06-26 2021-07-26 2021-08-30 2021-10-04 2022-04-02 Disposal, Collection and Based Selection Implementation and Project Management Recycling Scheme, Gaza Strip – Palestine Page 1 GZ-PENRA-232079-CS-QCBS / Consultancy Services to the Component 4: Technical Palestinian Energy & Natural Quality And Cost- TF / B3015 Assistance, Capacity Building Post Open - International 250,000.00 0.00 Canceled 2021-05-10 2021-04-29 2021-05-31 2021-07-30 2021-08-29 2021-09-28 2021-10-15 2021-12-03 2022-06-01 Resources Authority for the Based Selection and Project Management negotiation of a Gas Purchase Agreement for G4G Project Component 1: Improving GZ-PENRA-233459-CS-LCS / Infrastructure for Regional Quality And Cost- Under Design for PETL NCC SCADA TF / B3015 Post Open - National 35,000.00 0.00 2021-05-19 2021-05-16 2021-06-09 2021-08-08 2021-09-05 2021-10-05 2021-11-09 2021-12-14 2022-06-12 Electricity Interconnections in Based Selection Implementation system’s development the West Bank and Gaza GZ-PENRA-237250-CS-CQS / Consultancy Services to the Component 4: Technical Consultant Palestinian Energy & Natural Under TF / B3015 Assistance, Capacity Building Post Qualification Limited 250,000.00 0.00 2021-06-06 2021-05-31 2021-06-20 2021-07-20 2021-08-24 2022-02-20 Resources Authority for the Implementation and Project Management Selection negotiation of a Gas Purchase Agreement for G4G Project INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GZ-PENRA-211416-CS-INDV Component 4: Technical Individual / Project Execution Consultant TF / B3015 Assistance, Capacity Building Post Consultant Direct 40,000.00 40,000.00 Signed 2021-01-20 2021-01-13 2021-01-27 2021-01-13 2021-01-29 2021-01-17 2021-02-03 2021-03-01 2022-02-03 for PENRA PMU and Project Management Selection GZ-PENRA-213086-CS-INDV Component 4: Technical Individual / Liquidity Support Fund TF / B3015 Assistance, Capacity Building Post Consultant Direct 40,000.00 40,000.00 Signed 2021-01-20 2021-01-13 2021-01-30 2021-01-13 2021-02-20 2021-01-25 2021-03-27 2021-01-28 2021-09-23 Design Consultant and Project Management Selection GZ-PENRA-221741-CS-INDV / Consulting Management Services for Preparation of Generic & Site-Specific Component 4: Technical Individual Environmental and Social TF / B3015 Assistance, Capacity Building Post Consultant Direct 15,000.00 15,000.00 Signed 2021-03-15 2021-03-28 2021-03-25 2021-03-31 2021-04-15 2021-04-05 2021-05-20 2021-04-04 2021-07-19 Instruments for the Sub- and Project Management Selection project “Supply & Installation of 3 Medium Voltage Lines from Qusin-Sarra Junction to Qusin-Bet Iba Junction “ GZ-PENRA-228054-CS-INDV Component 4: Technical Individual / Liquidity Support Fund – Under TF / B3015 Assistance, Capacity Building Post Consultant Direct 30,000.00 0.00 2021-04-06 2021-04-07 2021-04-16 2021-04-12 2021-05-07 2021-06-11 2021-12-08 Financial/Technical Support – Implementation and Project Management Selection Local Page 2 Projet SUD PLAN DE PASSATIO N DE MARCHES SIMPLIFIE PROJET SUD : PID : PPA SUD N# : DA PRO TE RAPP OUV JET DAT ME Coût TER DEMA OU ORT ERT DAT DE E TH estim MES NDE JUSTIF VE D'EV URE Caté LISTE E CON SIG Ré Descripti Rev OD Appr atif DE DE ICATI RT ALUA DES comp gori AMI REST INVI TRA NAT f on ue E oche (en REF PROP ON UR TION PLIS e REINT TATI T URE P. miller ERE OSITI SED E TECH FINA E ON NEG CON M. s US$) NCE ON DE NIQU NCIE OCI TRA S E RS E T PLI S Appui techniq ue à la cellule 141. de 00 prépara tion Recrutem SU ent 30 D- Cons 11 15 03 02 31 29 28 27 31 Economis Ouver 1 01 Jan. - De - PP post ultan CI Dec. 4 Dec. Jan. # Jan. # # Dec. Dec. # Dec. # Dec. 4 Dec. A- te en t te 15.000 19 19 9 20 20 20 19 1 c. 1 19 19 19 19 développ 19 C-1 ement local et inclusif Recrutem SU ent D- Spécialist Cons 11 16 05 05 05 05 05 05 05 10 2 05 Jan. PP e en post ultan CI Ouver 15.000 Dec. 5 Dec. 0 Jan. 0 Jan. 0 20 0 Jan. 0 Jan. 0 Jan. 0 Jan. 0 Jan. 5 Jan. A- Passation t te 19 19 20 20 20 20 20 20 20 20 C-2 de Marché Recrutem SU ent D- Cons 11 16 05 05 06 07 08 09 09 14 Spécialist Ouver 2 06 Jan. PP post ultan CI Dec. 5 Dec. Jan. 0 Jan. 1 0 Jan. 1 Jan. 1 Jan. 1 Jan. 0 Jan. 5 Jan. A- e en t te 15.000 19 19 0 20 20 20 20 20 20 20 20 20 C-3 Gestion financière Recrutem SU ent D- Spécialist Cons 11 16 05 05 07 09 11 13 13 18 2 07 Jan. PP e en post ultan CI Ouver 15.000 Dec. 5 Dec. 0 Jan. 0 Jan. 2 20 0 Jan. 2 Jan. 2 Jan. 2 Jan. 0 Jan. 5 Jan. A- gestion t te 19 19 20 20 20 20 20 20 20 20 C-4 environne mentale Recrutem SU ent D- Spécialist Cons 20 26 16 17 21 24 27 30 31 06 2 20 Jan. PP e en suivi post ultan CI Ouver 15.000 Dec. 6 Dec. 1 Jan. 1 Jan. 3 20 1 Jan. 3 Jan. 3 Jan. 3 Jan. 1 Jan. 6 Feb. A- et t te 19 19 20 20 20 20 20 20 20 20 C-5 évaluatio n Recrutem SU ent D- Cons 20 27 18 20 26 30 03 07 09 16 Spécialist 2 24 Jan. PP post ultan CI Ouver Dec. 7 Dec. Jan. 2 Jan. 4 2 Jan. 4 Jan. 4 Feb. 4 Feb. 2 Feb. 7 Feb. A- e en t te 15.000 19 19 2 20 20 20 20 20 20 20 20 20 C-6 communi cation SU Recrutem D- Cons 20 28 20 23 31 05 10 15 18 26 ent 2 28 Jan. PP post ultan CI Ouver Dec. 8 Dec. Jan. 3 Jan. 5 3 Jan. 5 Feb 5 Feb. 5 Feb. 3 Feb. 8 Feb. A- Spécialist t te 15.000 19 19 3 20 20 20 20 . 20 20 20 20 20 C-7 e en SIG Recrutem SU ent Appui D- Cons 05 14 07 11 17 21 27 04 10 14 23 technique 2 PP post ultan CI Ouver Jan. 9 Jan. Feb. 4 Feb. 6 Feb. 4 Feb. 6 Feb 6 Mar. 6 Mar. 4 Mar. 9 Mar. A- auprès t te 36.000 20 20 4 20 20 20 20 . 20 20 20 20 20 C-8 des trois régions Recrutem SU ent D- Cons 11 20 13 17 27 02 08 14 18 27 Spécialist Ouver 2 23 Jan. PP post ultan CI Dec. 9 Dec. Jan. 4 Jan. 6 4 Jan. 6 Feb 6 Feb. 6 Feb. 4 Feb. 9 Feb. A- e en t te 15.000 19 19 4 20 20 20 20 . 20 20 20 20 20 C-9 gestion Sociale Etude prépara 190. toire 00 SU Etudes D- Cons 15 20 09 12 12 19 05 13 20 01 environne SQ Ouver 2 12 Jan. 3 1 1 PP post ultan 100.00 Dec. 5 Dec. Jan. 3 Jan. 0 0 Jan. Feb Mar. 8 Mar. 7 Mar. Apr. mentales C te 0 20 8 5 2 A- t 0 19 19 20 20 20 . 20 20 20 20 20 et sociales C-9 Développe ment et SU mise en D- œuvre de Cons 15 20 09 12 12 12 21 05 13 20 02 PP SQ Ouver 2 3 1 1 la stratégie post ultan Jan. 5 Jan. Feb. 3 Feb. 0 Feb. 0 Feb. Mar Apr. 8 Apr. 7 Apr. May. A- C te 50.000 0 8 5 2 de t 20 20 20 20 20 20 . 20 20 20 20 20 C- communic 10 ation du Projet SU Etude sur D- la Cons 31 05 25 28 28 28 06 21 29 06 18 PP mobilisatio SQ Ouver 2 3 1 1 post ultan Jan. 5 Feb. Feb. 3 Feb. 0 Feb. 0 Feb. Apr Apr. 8 Apr. 7 May. May. A- n C te 10.000 0 8 5 2 t 20 20 20 20 20 20 . 20 20 20 20 20 C- communau 11 taire et l’engagem ent citoyen Elaboration de Manuels SU d’exécutio D- n du Projet Cons 15 20 09 12 12 19 05 13 20 01 PP (opération SQ Ouver 2 12 Jan. 3 1 1 post ultan Dec. 5 Dec. Jan. 3 Jan. 0 0 Jan. Feb Mar. 8 Mar. 7 Mar. Apr. A- nel, C te 30.000 0 20 8 5 2 t 19 19 20 20 20 . 20 20 20 20 20 C- gestion 12 financière, passation de marché) Renforc ement de 110. capacit 00 é du MID Formation SU de D- montage Cons 20 25 14 17 17 17 26 10 18 25 07 PP Ouver 2 3 1 1 et gestion post ultan CI Jan. 5 Jan. Feb. 3 Feb. 0 Feb. 0 Feb. Mar Apr. 8 Apr. 7 Apr. May. A- te 30.000 0 8 5 2 de Projet t 20 20 20 20 20 20 . 20 20 20 20 20 C- dans 3 13 Regions Equipe ment et 30.0 logistiq 0 ues Acquisition SU de D- matériels Four 15 20 09 12 12 27 30 02 07 09 Ouver 2 12 Jan. 1 PP informatiq post nitur DC Dec. 5 Dec. Jan. 3 Jan. 0 0 Jan. Jan. 3 Jan. 3 Feb. 5 Feb. 2 Feb. te 15.000 0 20 5 A- ues en e 19 19 20 20 20 20 20 20 20 20 F-1 plusieurs lots SU Acquisition D- de Four 15 20 09 09 11 11 11 11 16 21 2 09 Jan. PP matériel et post nitur DC Ouver Dec. 5 Dec. Jan. 0 Jan. 0 2 Jan. 0 Jan. 0 Jan. 0 Jan. 5 Jan. 5 Jan. 10.000 0 20 A- mobilier de e te 19 19 20 20 20 20 20 20 20 20 F-2 bureau SU Acquisition D- Four 15 20 09 09 11 11 11 11 16 21 de Ouver 2 09 Jan. PP post nitur DC Dec. 5 Dec. Jan. 0 Jan. 0 2 Jan. 0 Jan. 0 Jan. 0 Jan. 5 Jan. 5 Jan. fourniture te 5.000 0 20 A- e 19 19 20 20 20 20 20 20 20 20 de bureau F-3 Servi SU ce D- Location autre 20 25 25 25 28 28 28 28 02 02 Ouver 27 Jan. PP de post que DC Jan. 5 Jan. 0 Jan. 0 Jan. 2 1 Jan. 0 Jan. 0 Jan. 0 Jan. 5 Feb. 0 Feb. te 20.000 20 A- véhicules Cons 20 20 20 20 20 20 20 20 20 20 F-4 ultan t Activité s Pilotes 600. du 00 Projet Assistance Technique pour la mobilisatio n, SU formations, D- planificatio Cons 31 05 25 25 25 27 27 27 27 03 08 PP SF Ouver 2 n et post ultan 600.00 Jan. 5 Feb. Feb. 0 Feb. 0 Feb. 2 Feb. 0 Feb 0 Feb. 0 Feb. 5 Mar. 5 Mar. A- QC te 0 priorisation t 0 20 20 20 20 20 20 . 20 20 20 20 20 C- des 14 demandes (après le ciblage des communes ) Atelier 75.0 0 Servi ce autre 05 10 30 02 02 02 22 22 22 29 12 restre 2 2 1 Atelier post que DC Jan. 5 Jan. Jan. 3 Feb. 0 Feb. 0 Feb. Feb 0 Feb. 0 Feb. 7 Feb. Mar. inte 75.000 0 0 2 Cons 20 20 20 20 20 20 . 20 20 20 20 20 ultan t TOTAL GENERAL (en Tota 1,11 millions l 6.00 US$) PROCUREMENT Madagascar : Support for resilient livelihoods in the South of Madagascar PLAN General Information Country: Madagascar Bank’s Approval Date of the Original Procurement Plan: 2020-02-04 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171056 GPN Date: Project Name: Support for resilient livelihoods in the South of Madagascar Loan / Credit No: IDA / D7510, / , IDA / V3060 MID- SOUTH PROJECT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MID-SOUTH PROJECT-01- Strengthening decentralized RFQ / Acquisition de local governments, Request for Single Stage - One matériels, consommables IDA / V3060 Post Limited 20,000.00 8,312.23 Signed 2020-09-26 2020-09-25 2020-11-21 2020-11-04 2021-05-20 participatory planning and Quotations Envelope informatiques et matériels social resilience techniques MG-MID-SOUTH PROJECT-02- Strengthening decentralized RFQ / Acquisition de local governments, Request for Single Stage - One IDA / V3060 Post Limited 4,500.00 2,581.94 Signed 2020-09-26 2020-11-10 2020-11-21 2020-11-19 2021-05-20 smartphone pour l'équipe du participatory planning and Quotations Envelope projet social resilience MG-MID-SOUTH PROJECT-03- Strengthening decentralized RFQ / Acquisition de mobilier local governments, Request for Single Stage - One IDA / V3060 Post Limited 37,000.00 14,184.18 Signed 2020-09-26 2020-10-30 2020-11-21 2020-12-21 2021-05-20 de bureau pour l'équipe du participatory planning and Quotations Envelope projet social resilience Strengthening decentralized MG-MID-SOUTH PROJECT-04- local governments, Request for Single Stage - One RFQ / Acquisition de IDA / V3060 Post Limited 12,200.00 4,059.51 Signed 2020-09-26 2020-11-03 2020-11-21 2020-11-24 2021-05-20 participatory planning and Quotations Envelope fournitures de bureau social resilience MG-MID-SOUTH PROJECT- Strengthening decentralized 031-GO-DIR / Achat de local governments, IDA / V3060 Post Direct Selection Direct 25,000.00 28,893.43 Signed 2020-10-22 2020-11-10 2020-10-27 2020-11-04 2020-12-01 2021-03-04 2021-03-01 logiciel TOM2PRO et participatory planning and FORMATION social resilience Strengthening decentralized MG-MID-SOUTH PROJECT- local governments, Request for Single Stage - One 002-GO-RFQ / Acquisition de IDA / V3060 Post Limited 14,000.00 18,479.66 Signed 2020-10-27 2020-10-27 2020-12-22 2020-11-25 2021-01-06 participatory planning and Quotations Envelope 6 desktop et 6 Imprimante social resilience Strengthening decentralized MG-MID-SOUTH PROJECT- local governments, Request for Single Stage - One 003-GO-RFQ / Acquisition de IDA / V3060 Post Limited 1,500.00 0.00 Canceled 2020-10-27 2020-12-22 2021-01-06 participatory planning and Quotations Envelope video projecteur social resilience MG-MID-SOUTH PROJECT- Strengthening decentralized 004-GO-RFQ / Achat local governments, Request for Single Stage - One IDA / V3060 Post Limited 14,000.00 3,907.44 Signed 2020-10-27 2020-11-05 2020-12-22 2020-12-07 2021-01-06 photocopieuse de 2 participatory planning and Quotations Envelope photocopieuses social resilience MG-MID-SOUTH PROJECT- 4.A.09.16-PPA-GO / Implementation Support and Request for Single Stage - One IDA / V3060 Post Limited 25,000.00 48,921.10 Signed 2021-02-06 2021-02-04 2021-04-03 2021-03-09 2021-06-02 Acquisition de matériels knowledge learning Quotations Envelope informatique et auxiliaires MG-MID-SOUTH PROJECT- 4.A.08.03-PPA-DC / Implementation Support and Request for Single Stage - One Acquisition de deux voitures IDA / D7510 Post Limited 140,000.00 158,383.56 Signed 2021-02-06 2021-01-20 2021-04-03 2021-03-15 2021-04-23 knowledge learning Quotations Envelope pour le Coordonnateur et pour l'équipe de l'UNGP MG-MID-SOUTH PROJECT- Implementation Support and Request for Single Stage - One 4.A.08.04-PPA-DC / Achat de IDA / V3060 Post Limited 9,000.00 12,490.31 Signed 2021-02-13 2021-04-14 2021-04-10 2021-06-07 2021-04-20 knowledge learning Quotations Envelope 29 smartphones MG-MID-SOUTH PROJECT- 227586-GO-DIR / Acquisition Pending Implementation Support and Request for Single Stage - One de licence du logiciel IDA / D7510 Post Limited 3,700.00 0.00 Implementati 2021-05-05 2021-06-30 2021-07-14 knowledge learning Quotations Envelope Microsoft 365 (comprenant on l'application TEAMS) MG-MID-SOUTH PROJECT- 002 CERC-GO-RFQ / Pending Contingent Emergency Request for Single Stage - One Acquisition de matériels IDA / D7510 Post Limited 2,300.00 0.00 Implementati 2021-05-22 2021-07-17 2021-08-06 Response Component Quotations Envelope informatiques et accessoires on pour l'équipe de suivi CERC MG-MID-SOUTH PROJECT- Pending 001 CERC-GO-RFQ / Achat de Contingent Emergency Request for Single Stage - One IDA / D7510 Post Limited 900.00 0.00 Implementati 2021-05-22 2021-06-29 2021-07-19 mobilier de bureau pour Response Component Quotations Envelope on l'équipe suivi CERC NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MID-SOUTH PROJECT- 4.A.09.17-PPA-NC / Implementation Support and Request for Single Stage - One IDA / V3060 Post Limited 12,000.00 3,236.04 Signed 2021-02-20 2021-02-09 2021-04-17 2021-03-25 2025-02-25 Recrutement Société de knowledge learning Quotations Envelope nettoyage Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening decentralized MG-MID-SOUTH PROJECT- Consultant local governments, 001-CS-CQS / Etudes IDA / D7510 Post Qualification Open - National 100,000.00 43,793.13 Signed 2020-02-04 2019-12-16 2020-02-19 2020-02-21 2020-03-07 2020-05-25 2020-03-27 2020-05-25 2020-04-13 2020-05-15 2021-04-13 participatory planning and environnementales et sociales Selection social resilience MG-MID-SOUTH PROJECT- 005-CS-CQS / Consultant Pending Développement et mise en / Post Qualification Open - National 50,000.00 0.00 2020-02-04 2020-02-19 2020-03-25 2020-04-24 2020-05-06 2020-11-02 Implementation œuvre de la stratégie de Selection communication du Projet Strengthening decentralized MG-MID-SOUTH PROJECT-16- Consultant local governments, CS-CQS / Pipeline technique IDA / V3060 Post Qualification Open - National 100,000.00 87,054.90 Signed 2020-09-03 2020-09-03 2020-09-24 2020-11-07 2020-10-05 2020-12-07 2021-02-09 2021-01-11 2021-02-09 2021-07-10 participatory planning and d'audit Sampona Selection social resilience MG-MID-SOUTH PROJECT-15- CS-CQS / Etudes sur la Strengthening decentralized Consultant ressource en eau au niveau local governments, IDA / V3060 Post Qualification Open - National 180,000.00 208,529.53 Signed 2020-09-03 2020-09-03 2020-09-24 2020-11-07 2020-12-23 2020-12-07 2021-04-21 2021-01-11 2021-05-14 2021-07-10 des des points de captage des participatory planning and Selection pipelines Sampona et social resilience Ampotaka MG-MID-SOUTH PROJECT-17- CS-SFQC / Étude des ressources en eau et de la Strengthening decentralized situation de référence des local governments, Quality And Cost- IDA / V3060 Post Open - National 100,000.00 40,235.89 Signed 2020-09-07 2020-09-10 2020-09-28 2020-11-11 2020-12-03 2020-12-09 2021-01-18 2021-01-08 2021-02-22 2021-02-12 2021-03-01 2021-03-19 2021-04-26 2022-03-19 périmètres irrigués au niveau participatory planning and Based Selection des bassins versants des social resilience Districts de Betroka, d'Ambovombe et d'Ankazoabo MG-MID-SOUTH PROJECT- Strengthening decentralized 030-CS-CQS / Recrutement Consultant local governments, d'un Cabinet pour IDA / V3060 Post Qualification Limited 20,000.00 23,358.82 Signed 2020-10-28 2020-11-10 2020-11-11 2020-11-10 2020-12-11 2020-11-24 2021-01-15 2020-11-24 2021-01-21 participatory planning and l'élaboration du manuel Selection social resilience d'opération du Projet MG-MID-SOUTH PROJECT- 1.A.03.02-PPA-NCS / Recrutement des Partenaires facilitateurs pour Strengthening decentralized Consultant accompagner les SLC, AD et, local governments, IDA / V3060 Post Qualification Open - National 850,000.00 0.00 Under Review 2021-02-15 2021-03-01 2021-03-08 2021-04-21 2021-05-21 2021-06-25 2025-05-05 Commune. Répartis en trois participatory planning and Selection lots: social resilience - lot 1 : région Anosy, - lot 2: Androy, lot 3 : Atsimo Andreafana MG-MID-SOUTH PROJECT- Strengthening decentralized 4.A.03.01-PPA-SQC / Consultant local governments, Pending Élaboration et mise en œuvre IDA / V3060 Post Qualification Open - National 30,000.00 0.00 2021-03-15 2021-04-05 2021-05-19 2021-06-18 2021-07-23 2021-09-21 participatory planning and Implementation de la Stratégie de Selection social resilience communication du Projet MG-MID-SOUTH PROJECT- C11-CS-QCBS / Etude sur la Quality And Cost- IDA / V3060 Post Open - National 10,000.00 0.00 Canceled 2020-07-29 2020-08-12 2020-08-08 2020-08-14 2020-08-21 2020-08-24 2020-09-08 2020-09-18 2021-09-18 mobilisation communautaire Based Selection et l’engagement citoyen MG-MID-SOUTH PROJECT- 004 CERC-CS-CDS / Consultant Recrutement d’une agence Contingent Emergency Under IDA / D7510 Post Qualification Limited 27,500.00 0.00 2021-05-17 2021-06-22 2021-05-31 2021-06-30 2021-08-04 2022-01-31 événementielle pour le Response Component Implementation Selection lancement officiel des activités CERC et du Projet MG-MID-SOUTH PROJECT- 4.A.11.001A-CS-CQS / Recrutement de partenaires relais réparti en 3 Lots. Lot 1: Implementation Support and Quality And Cost- Under IDA / V3060 Prior Open - International 5,330,120.00 0.00 2021-05-17 2021-06-28 2021-08-02 2021-08-30 2021-09-29 2021-10-29 2021-12-03 2025-03-17 pour la région Anosy, Lot 2: knowledge learning Based Selection Implementation pour la région Androy et Lot 3 : pour la région Atsimo Andrefana. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MID-SOUTH PROJECT- Strengthening decentralized Individual 002-CS-INDV / Recrutement local governments, IDA / D7510 Post Consultant Limited 22,500.00 15,938.37 Signed 2020-02-04 2020-03-19 2020-02-09 2020-06-05 2020-02-19 2020-07-01 2020-03-04 2020-07-27 2021-08-31 Spécialiste en Passation de participatory planning and Selection Marché social resilience MG-MID-SOUTH PROJECT- Strengthening decentralized Individual 003-CS-INDV / Recrutement local governments, IDA / D7510 Post Consultant Limited 22,500.00 16,028.28 Signed 2020-02-04 2020-03-18 2020-02-09 2020-06-05 2020-02-19 2020-07-01 2020-03-04 2020-09-21 2021-08-31 Spécialiste en Gestion participatory planning and Selection financière social resilience MG-MID-SOUTH PROJECT- Individual 004-CS-INDV / Recrutement IDA / V3060 Post Consultant Limited 15,000.00 16,024.64 Signed 2020-04-29 2020-05-25 2020-05-04 2020-06-19 2020-05-25 2020-09-18 2020-06-29 2020-09-21 2020-12-26 Spécialiste en gestion Selection environnementale MG-MID-SOUTH PROJECT- Strengthening decentralized Individual 009-CS-INDV / Recrutement local governments, IDA / V3060 Post Consultant Open 15,000.00 14,318.10 Signed 2020-04-29 2020-05-25 2020-06-09 2020-09-08 2020-06-19 2020-10-08 2020-06-29 2020-10-12 2020-08-04 de Spécialiste en gestion participatory planning and Selection sociale social resilience Page 2 MG-MID-SOUTH PROJECT-25- Strengthening decentralized Individual CS-INDV / Elaboration de local governments, IDA / V3060 Post Consultant Limited 20,000.00 0.00 Canceled 2020-10-12 2020-11-10 2020-10-17 2020-11-07 2020-12-12 2021-06-10 manuel de procédure du participatory planning and Selection projet social resilience MG-MID-SOUTH PROJECT-21- Strengthening decentralized Individual CS-INDV / Responsable local governments, IDA / V3060 Post Consultant Limited 18,000.00 71,120.70 Signed 2020-10-28 2020-10-30 2020-11-02 2021-02-11 2020-11-23 2021-02-22 2020-12-28 2021-03-22 2021-12-23 Programmation Suivi et participatory planning and Selection Evaluation social resilience Strengthening decentralized MG-MID-SOUTH PROJECT-23- Individual local governments, CS-INDV / Assistant en IDA / V3060 Post Consultant Limited 12,000.00 28,990.62 Terminated 2020-10-28 2020-10-30 2020-11-02 2020-12-16 2020-11-23 2020-12-17 2020-12-28 2021-01-04 2021-12-23 participatory planning and passation de marché Selection social resilience Strengthening decentralized MG-MID-SOUTH PROJECT- Individual local governments, 025-CS-INDV / Recrutement IDA / V3060 Post Consultant Limited 12,000.00 28,056.86 Signed 2020-11-03 2020-11-10 2020-11-08 2021-01-06 2020-11-29 2021-02-11 2021-01-03 2021-03-11 2021-12-29 participatory planning and Assistant(e) du Coordonnateur Selection social resilience MG-MID-SOUTH PROJECT- Strengthening decentralized 024-CS-INDV / Recrutement Individual local governments, Responsable Gouvernance IDA / V3060 Post Consultant Limited 18,000.00 71,201.70 Signed 2020-11-03 2020-11-10 2020-11-08 2020-12-09 2020-11-29 2020-12-28 2021-01-03 2021-03-05 2021-12-29 participatory planning and locale et de la participation Selection social resilience citoyenne MG-MID-SOUTH PROJECT- Strengthening decentralized Individual 019-CS-INDV / Recrutement local governments, IDA / V3060 Post Consultant Limited 28,000.00 0.00 Canceled 2020-10-28 2020-11-02 2020-11-23 2020-12-28 2021-12-23 d'un Coordonnateur National participatory planning and Selection du Projet social resilience Strengthening decentralized MG-MID-SOUTH PROJECT- Individual local governments, Under 026-CS-INDV / Recrutement IDA / V3060 Post Consultant Direct 112,000.00 0.00 2020-11-16 2020-12-14 2020-11-26 2020-12-16 2020-12-17 2021-01-15 2021-01-21 2024-12-31 participatory planning and Implementation Coordonnateur National Selection social resilience Strengthening decentralized MG-MID-SOUTH PROJECT-22- Individual local governments, CS-INDV / Associé de IDA / V3060 Post Consultant Limited 60,000.00 0.00 Canceled 2020-11-27 2020-12-02 2020-12-23 2021-01-27 2025-01-06 participatory planning and programme Selection social resilience MG-MID-SOUTH PROJECT- Strengthening decentralized 027-CS-INDV / Recrutement Individual local governments, Under d'un(e) Responsable en IDA / V3060 Post Consultant Limited 72,000.00 0.00 2020-11-30 2021-04-06 2020-12-05 2020-12-26 2021-01-30 2025-01-09 participatory planning and Implementation résilience sociale et Selection social resilience développement locale MG-MID-SOUTH PROJECT- Strengthening decentralized Individual 028-CS-INDV / Recrutement local governments, IDA / V3060 Post Consultant Limited 72,000.00 64,081.53 Signed 2020-11-30 2020-12-03 2020-12-05 2020-12-14 2020-12-26 2021-02-26 2021-01-30 2021-03-05 2025-01-09 d'un(e) Responsable de la participatory planning and Selection communication et information social resilience Strengthening decentralized MG-MID-SOUTH PROJECT- Individual local governments, 029-CS-INDV / Recrutement IDA / V3060 Post Consultant Limited 48,000.00 21,529.34 Signed 2020-11-30 2020-12-03 2020-12-05 2020-12-09 2020-12-26 2020-12-21 2021-01-30 2021-01-21 2025-01-09 participatory planning and assistant(e) financier Selection social resilience Strengthening decentralized MG-MID-SOUTH PROJECT- Individual local governments, 031-CS-INDV / Recrutement IDA / V3060 Post Consultant Limited 48,000.00 39,259.39 Signed 2020-11-30 2020-11-23 2020-12-05 2020-12-09 2020-12-26 2020-12-21 2021-01-30 2021-01-21 2025-01-09 participatory planning and comptable Selection social resilience MG-MID-SOUTH PROJECT- Strengthening decentralized Individual 032-CS-INDV / Recrutement local governments, IDA / V3060 Post Consultant Limited 48,000.00 38,080.90 Terminated 2020-11-30 2020-12-15 2020-12-05 2020-12-16 2020-12-26 2020-12-16 2021-01-30 2020-12-17 2025-01-09 d'un Chargée d'appui à la participatory planning and Selection passation de marchés social resilience MG-MID-SOUTH PROJECT- Individual Implementation Support and Under 4.A.02.15-PPA-CS / IDA / V3060 Post Consultant Open 57,500.00 0.00 2021-02-15 2021-06-24 2021-04-05 2021-04-26 2021-05-31 2025-03-11 knowledge learning Implementation Recrutement Auditeur interne Selection MG-MID-SOUTH PROJECT- Individual 4.A.02.05-PPA-CS / Implementation Support and IDA / V3060 Post Consultant Open 65,200.00 57,771.65 Signed 2021-02-15 2021-02-11 2021-04-05 2021-04-05 2021-04-26 2021-04-08 2021-05-31 2021-04-08 2025-03-11 Recrutement Responsable du knowledge learning Selection volet irrigation MG-MID-SOUTH PROJECT- Individual 4.A.02.16-PPA-CS / Implementation Support and IDA / V3060 Post Consultant Limited 43,000.00 23,856.24 Signed 2021-02-01 2021-02-11 2021-02-06 2021-01-26 2021-02-27 2021-02-01 2021-04-03 2021-03-05 2024-10-14 Recrutement Assistant en knowledge learning Selection Passation de marches MG-MID-SOUTH PROJECT- 4.A.02.04-PPA-CS / Individual Implementation Support and Recrutement d'un responsable IDA / V3060 Post Consultant Open 65,200.00 58,336.13 Signed 2021-02-15 2021-04-06 2021-04-05 2021-05-03 2021-04-26 2021-05-11 2021-05-31 2021-06-01 2025-03-11 knowledge learning du volet eau, assainissement Selection et hygiène MG-MID-SOUTH PROJECT- Individual 4.A.03.026-PPA-CS / Implementation Support and Pending IDA / V3060 Post Consultant Open 2,700.00 0.00 2021-03-01 2021-04-19 2021-05-10 2021-06-14 2021-07-14 Recrutement consultant pour knowledge learning Implementation Selection le conception du logo MG-MID-SOUTH PROJECT- Individual 4.A.02.06-PPA-CS / Implementation Support and IDA / V3060 Post Consultant Open 65,200.00 59,698.30 Signed 2021-02-15 2021-02-11 2021-04-05 2021-04-05 2021-04-26 2021-05-14 2021-05-31 2021-06-10 2025-03-11 Recrutement du Responsable knowledge learning Selection du développement agricole MG-MID-SOUTH PROJECT- 4.A.02.09-PPA-CS / Individual Implementation Support and Recrutement du Responsable IDA / V3060 Post Consultant Limited 66,500.00 64,232.19 Signed 2021-02-01 2021-02-11 2021-02-06 2021-02-03 2021-02-27 2021-03-01 2021-04-03 2021-03-05 2025-02-11 knowledge learning des opérations et de la Selection gestion des connaissances MG-MID-SOUTH PROJECT- Individual 4.A.02.10-PPA-CS / Implementation Support and Under IDA / V3060 Post Consultant Limited 43,000.00 0.00 2021-02-22 2021-04-06 2021-04-12 2021-05-03 2021-06-07 2025-03-18 Recrutement Assistant knowledge learning Implementation Selection Gouvernance locale Page 3 MG-MID-SOUTH PROJECT- 4.A.02.10-CS-INDV / Responsable en prévention et Individual Implementation Support and Under accompagnement des VBG IDA / D7510 Post Consultant Open 63,750.00 0.00 2021-04-15 2021-04-28 2021-06-03 2021-06-24 2021-07-29 2025-04-09 knowledge learning Implementation (Violence Basée sur le Genre) Selection et des VCE (Violence contre les Enfants) MG-MID-SOUTH PROJECT- 4.A.02.27-CS-IND / Individual Implementation Support and Under Assistant(e) en IDA / D7510 Post Consultant Open 45,000.00 0.00 2021-04-15 2021-04-28 2021-06-03 2021-06-07 2021-06-24 2021-07-29 2025-04-09 knowledge learning Implementation programmation et suivi- Selection évaluation MG-MID-SOUTH PROJECT- Individual 4.A.02.12-CS-INDV / Implementation Support and Under IDA / D7510 Post Consultant Open 63,750.00 0.00 2021-04-15 2021-04-28 2021-06-03 2021-06-24 2021-07-29 2025-04-09 Responsable Système knowledge learning Implementation Selection d'Information Numérique MG-MID-SOUTH PROJECT- Individual Implementation Support and Under 4.A.02.18-CS-INDV / IDA / D7510 Post Consultant Open 56,250.00 0.00 2021-04-15 2021-04-28 2021-06-03 2021-06-24 2021-07-29 2025-04-09 knowledge learning Implementation Comptable_2 Selection MG-MID-SOUTH PROJECT- Individual Implementation Support and Under 4.A.02.19-CS-INDV / IDA / D7510 Post Consultant Open 56,250.00 0.00 2021-04-15 2021-04-28 2021-06-03 2021-06-24 2021-07-29 2025-04-09 knowledge learning Implementation Comptable_3 Selection MG-MID-SOUTH PROJECT- Individual 4.A.02.20-CS-INDV / Implementation Support and Under IDA / D7510 Post Consultant Open 56,250.00 0.00 2021-04-15 2021-04-28 2021-06-03 2021-06-24 2021-07-29 2025-04-09 Informaticien spécialiste en knowledge learning Implementation Selection SIG MG-MID-SOUTH PROJECT- Individual 4.A.02.11-PPA-CS / Implementation Support and Under IDA / V3060 Post Consultant Open 47,000.00 0.00 2021-04-15 2021-04-28 2021-06-03 2021-06-24 2021-07-29 2025-06-08 Recrutement Infographiste knowledge learning Implementation Selection Designer Strengthening decentralized MG-MID-SOUTH PROJECT- Individual local governments, 030-CS-INDV / Recrutement IDA / V3060 Post Consultant Limited 48,000.00 0.00 Canceled 2020-11-25 2021-04-28 2020-11-30 2020-12-21 2021-01-25 2025-01-04 participatory planning and Sigiste Selection social resilience MG-MID-SOUTH PROJECT- 4.A.02.35-CS-INDV / Individual Recrutement d'un (e) Implementation Support and IDA / D7510 Post Consultant Open 56,250.00 0.00 Under Review 2021-05-10 2021-06-24 2021-06-28 2021-07-19 2021-08-23 2025-02-03 Assistant(e) en sauvegarde knowledge learning Selection environnementale et sociale région Androy MG-MID-SOUTH PROJECT- 002-UNICEF-CS-CDS / Assistance technique de l' Contingent Emergency Pending UNICEF, face aux besoins IDA / D7510 Post Direct Selection Direct 2,000,000.00 0.00 2021-04-28 2021-05-03 2021-05-09 2022-10-31 Response Component Implementation d'urgence suite à la crise alimentaire et sècheresse dans le Sud MG-MID-SOUTH PROJECT- 001-FAO-CS-CDS / Assistante technique de FAO Contingent Emergency Under IDA / D7510 Post Direct Selection Direct 10,000,000.00 0.00 2021-04-28 2021-03-31 2021-05-03 2021-05-09 2022-05-04 face aux besoins d'urgence Response Component Implementation suite à la crise alimentaire dans le sud et à la sècheresse MG-MID-SOUTH PROJECT- 4.A.02.34-CS-INDV / Individual Recrutement d'un (e) Implementation Support and IDA / D7510 Post Consultant Open 56,250.00 0.00 Under Review 2021-05-10 2021-06-24 2021-06-28 2021-07-19 2021-08-23 2025-02-03 Assistant(e) en sauvegarde knowledge learning Selection environnementale et sociale région Atsimo Andrefana MG-MID-SOUTH PROJECT- 4.A.02.28-CS-INDV / Individual Recrutement d'un (e) Implementation Support and IDA / D7510 Post Consultant Open 56,250.00 0.00 Under Review 2021-05-10 2021-06-24 2021-06-28 2021-07-19 2021-08-23 2025-02-03 Assistant(e) en sauvegarde knowledge learning Selection environnementale et sociale région Anosy MG-MID-SOUTH PROJECT- 01CERC-CS-INDV / Individual Recrutement d’un Contingent Emergency Under IDA / D7510 Post Consultant Open 34,000.00 0.00 2021-05-27 2021-06-22 2021-07-15 2021-08-05 2021-09-09 2023-03-03 Responsable de la Response Component Implementation Selection coordination des activités de la composante CERC MG-MID-SOUTH PROJECT- 002 CERC-CS-INDV / Individual Recrutement d’un(e) Contingent Emergency Under IDA / D7510 Post Consultant Open 11,000.00 0.00 2021-05-27 2021-06-22 2021-07-15 2021-08-05 2021-09-09 2023-03-03 Assistant(e) de coordination Response Component Implementation Selection des activités de la composante CERC MG-MID-SOUTH PROJECT- Individual 4.A.02.08-CS-INDV / Implementation Support and Under IDA / D7510 Post Consultant Limited 27,000.00 0.00 2021-07-01 2021-06-23 2021-07-06 2021-07-27 2021-08-31 2025-02-11 Recrutement chargé d'Appui knowledge learning Implementation Selection Passation de marchés Page 4 Request forQuotations Amendments to Contract Contract Draft Request for Quotations Specific Procurement Notice Invitation to Supplier / Contractor Request for Receive Quotations Comparison of Quotations Notification of Intention of Award Signed Contract Contract Completion Estimated Amendments Termination Activity Reference No. / Category Activity Quotations Loan / Credit No. Component Review Type Market Approach Amount Process Status Description: Status (US$) Planned Actual Planned Actual Planned Actual Actual Planned Actual Planned Actual Planned Actual Planned Actual Actual Planned Actual Actual Component 1: KE-ICIPE-92014-NC-RFQ / Capacity English/French Translation Non-consulting Open - TF-A8639 Development for Post 20,000.00 Submitted Returned 2018/12/18 2018/12/23 2018/12/23 2019/01/06 2019/01/13 2019/01/27 2019/02/17 2019/08/16 services Services International the operation and management of the PROCUREMENT Eastern Africa : Africa Regional Scholarship and Innovation Fund for Applied Sciences, Engineering and Technology PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2019-01-24 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165581 GPN Date: 2019-01-18 Project Name: Africa Regional Scholarship and Innovation Fund for Applied Sciences, Engineering and Technology Loan / Credit No: IDA / D3470 I Executing Agency(ies): nternational Centre of Insect Physiology and Ecology WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 1: Capacity KE-ICIPE-207260-CW-RFQ / Development for the Small works for office space Request for Single Stage - One 2021-07- IDA / D3470 operation and management Post Open - National 8,500.00 2,661.91 Signed 2020-12-05 2021-01-30 2021-04-07 partitioning to create a small Quotations Envelope 29 of the Scholarship, Research meeting room and Innovation Fund GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-ICIPE-95984-GO-RFQ / Component 1: Capacity Supply and delivery of Development for the Request for Single Stage - One computers/accessories and IDA / D3470 operation and management Post Open - National 75,000.00 22,334.63 Completed 2019-01-29 2019-01-30 2019-03-26 2019-05-03 2019-09-22 2019-07-15 Quotations Envelope basic software for most of the Scholarship, Research Universities and icipe. and Innovation Fund Component 1: Capacity KE-ICIPE-95980-GO-RFQ / Development for the Purchase of office furniture Request for Single Stage - One IDA / D3470 operation and management Post Open - National 44,000.00 0.00 Canceled 2019-01-30 2019-03-29 2019-09-25 (Tables, Desks, filing shelves, Quotations Envelope of the Scholarship, Research etc) and Innovation Fund Component 1: Capacity KE-ICIPE-114115-GO-RFQ / Development for the Request for Single Stage - One Procurement of office IDA / D3470 operation and management Post Open - National 1,000.00 861.77 Completed 2019-05-13 2019-07-08 2019-08-23 2020-01-04 2019-08-29 Quotations Envelope stationery of the Scholarship, Research and Innovation Fund Component 1: Capacity KE-ICIPE-138074-GO-RFQ / Development for the Purchase of Video Request for Single Stage - One IDA / D3470 operation and management Post Open - National 18,000.00 0.00 Canceled 2019-10-16 2019-12-11 2020-06-08 Conferencing equipment Quotations Envelope of the Scholarship, Research ,Camera and accessories. and Innovation Fund Component 1: Capacity KE-ICIPE-148316-GO-RFQ / Development for the This is an Request for Request for Single Stage - One IDA / D3470 operation and management Post Open - National 44,000.00 31,401.92 Completed 2019-12-05 2020-01-30 2020-02-10 2020-07-28 2020-03-03 Quotations for Office Quotations Envelope of the Scholarship, Research Furniture. and Innovation Fund Component 1: Capacity KE-ICIPE-159378-GO-RFQ / Development for the Purchase of Video Request for Single Stage - One IDA / D3470 operation and management Post Open - National 20,000.00 27,712.36 Completed 2020-02-14 2020-04-10 2020-06-09 2020-10-07 2020-10-06 Conferencing Equipment and Quotations Envelope of the Scholarship, Research Camera for RSIF. and Innovation Fund Component 1: Capacity KE-ICIPE-188272-GO-RFQ / Development for the Request for Single Stage - One Purchase of office furniture IDA / D3470 operation and management Post Limited 6,500.00 4,773.57 Completed 2020-08-19 2020-08-14 2020-10-14 2020-09-28 2021-04-12 2020-11-11 Quotations Envelope for RSIF staff. of the Scholarship, Research and Innovation Fund Component 1: Capacity KE-ICIPE-188274-GO-RFQ / Development for the Request for Single Stage - One Purchase of Laptops and IDA / D3470 operation and management Post Limited 9,000.00 8,731.49 Completed 2020-08-19 2020-08-17 2020-10-14 2020-09-28 2021-04-12 2021-02-09 Quotations Envelope accessories for RSIF Staff of the Scholarship, Research and Innovation Fund KE-ICIPE-188269-GO-RFQ / This is a Request for Component 1: Capacity Quotations for supply, Development for the delivery and installation of Single Stage - One IDA / D3470 operation and management Post Request for Bids Open - National 137,500.00 46,083.00 Signed 2020-08-16 2020-08-28 2020-08-21 2020-10-02 2020-10-05 2020-11-01 2020-11-12 2020-12-06 2020-12-15 2021-06-04 video conferencing equipment Envelope of the Scholarship, Research for RSIF Host Universities in and Innovation Fund Kenya, Tanzania, Rwanda, and Nigeria NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Capacity KE-ICIPE-114117-NC-RFQ / Development for the Procurement of service Request for Single Stage - One IDA / D3470 operation and management Post Open - National 5,000.00 1,511.93 Completed 2019-05-13 2019-07-08 2019-05-31 2020-01-04 2019-07-31 providers for printing Quotations Envelope of the Scholarship, Research communication materials and Innovation Fund KE-ICIPE-114787-NC-DIR / Component 1: Capacity Procurement of a Creative Development for the Request for Single Stage - One cloud software for Design IDA / D3470 operation and management Post Limited 600.00 476.47 Completed 2019-05-27 2019-05-24 2019-07-22 2019-06-13 2020-01-18 2019-06-19 Quotations Envelope work by the communications of the Scholarship, Research Officer and Innovation Fund KE-ICIPE-193842-NC-DIR / Component 1: Capacity Consultancy for video Development for the production for RSIF IDA / D3470 operation and management Post Direct Selection Direct 8,000.00 21,450.00 Signed 2020-09-14 2020-09-14 2020-09-19 2020-09-19 2020-10-24 2020-11-05 2021-04-22 appearance in icipe’s 50th of the Scholarship, Research anniversary celebration . and Innovation Fund Page 1 Component 1: Capacity KE-ICIPE-194870-NC-RFP / Development for the Request for Single Stage - One Translation and Simultaneous IDA / D3470 operation and management Post Open - National 25,000.00 0.10 Signed 2020-09-23 2020-11-18 2021-03-01 2021-05-17 Quotations Envelope Interpretation Services of the Scholarship, Research and Innovation Fund CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Capacity KE-ICIPE-95973-CS-QCBS / Development for the Quality And Cost- English to French or French to IDA / D3470 operation and management Post Open - International 20,000.00 126.40 Completed 2019-01-24 2019-02-14 2019-01-28 2019-03-30 2019-03-20 2019-04-27 2019-05-02 2019-05-27 2019-06-06 2019-07-01 2019-07-12 2019-08-05 2019-08-01 2020-08-04 2021-02-28 Based Selection English Translation Services of the Scholarship, Research and Innovation Fund KE-ICIPE-95977-CS-QCBS / Feasibility Study on Component 1: Capacity Establishment of an Development for the Endowment Fund for the Quality And Cost- IDA / D3470 operation and management Post Open - International 65,000.00 227,360.00 Completed 2019-01-24 2019-02-14 2019-01-28 2019-03-30 2019-03-18 2019-04-27 2019-04-29 2019-05-27 2019-05-15 2019-07-01 2019-08-15 2019-08-05 2019-08-22 2020-08-04 2021-01-17 Regional Scholarship and Based Selection of the Scholarship, Research Innovation Fund for Applied and Innovation Fund Sciences, Engineering and Technology Component 1: Capacity KE-ICIPE-109690-CS-CQS / Development for the Consultant Consultancy for Documentary IDA / D3470 operation and management Post Qualification Limited 10,000.00 5,722.00 Completed 2019-04-09 2019-03-28 2019-04-23 2019-04-12 2019-05-23 2019-05-03 2019-06-27 2019-05-16 2019-12-24 2019-07-26 production (Videography) for of the Scholarship, Research Selection the Fifth PASET Forum and Innovation Fund Component 1: Capacity KE-ICIPE-109695-CS-CQS / Development for the Consultant Consultancy for Photographer IDA / D3470 operation and management Post Qualification Limited 3,500.00 3,921.00 Completed 2019-04-09 2019-03-28 2019-04-23 2019-04-12 2019-05-23 2019-05-03 2019-06-27 2019-05-16 2019-12-24 2019-06-30 for the Fifth PASET Forum of the Scholarship, Research Selection and Innovation Fund Component 1: Capacity KE-ICIPE-109698-CS-CQS / Development for the Consultant Consultancy for Documentary IDA / D3470 operation and management Post Qualification Limited 7,000.00 10,023.00 Completed 2019-04-09 2019-03-28 2019-04-23 2019-04-12 2019-05-23 2019-05-03 2019-06-27 2019-05-16 2019-12-24 2019-05-31 production for the Fifth PASET of the Scholarship, Research Selection Forum - Interviews and Innovation Fund KE-ICIPE-119627-CS-CQS / Development of a Strategy for Component 1: Capacity Enhancing Women’s Development for the Consultant Participation in PhD Programs IDA / D3470 operation and management Post Qualification Limited 24,000.00 27,900.00 Completed 2019-06-18 2019-06-21 2019-06-20 2019-06-21 2019-07-20 2019-07-09 2019-08-24 2019-10-29 2020-02-20 2020-04-30 and Research in Applied of the Scholarship, Research Selection Sciences, Engineering, and and Innovation Fund Technology (ASET) fields at African Universities Component 1: Capacity KE-ICIPE-126754-CS-QCBS / Development for the Quality And Cost- Redesign and Development of IDA / D3470 operation and management Post Open - National 15,000.00 8,737.12 Completed 2019-08-09 2019-08-09 2019-08-30 2019-08-16 2019-10-13 2019-09-11 2019-11-10 2019-10-11 2019-12-10 2019-12-10 2020-01-14 2020-02-03 2020-02-18 2020-03-06 2021-02-17 2021-03-01 Based Selection the RSIF Website of the Scholarship, Research and Innovation Fund KE-ICIPE-127398-CS-QCBS / Component 1: Capacity Consultancy for Marketing, Development for the Communications, Branding Quality And Cost- IDA / D3470 operation and management Post Open - International 196,000.00 0.00 Canceled 2019-08-16 2019-08-16 2019-09-06 2019-08-16 2019-10-20 2019-09-27 2019-11-17 2019-12-17 2020-01-21 2020-02-25 2021-02-24 and Outreach for the Regional Based Selection of the Scholarship, Research Scholarship and Innovation and Innovation Fund Fund (RSIF). Component 1: Capacity KE-ICIPE-155036-CS-QCBS / Development for the Scholarships and Grants Quality And Cost- IDA / D3470 operation and management Post Open - National 40,000.00 30,609.00 Signed 2020-01-22 2020-01-22 2020-01-24 2020-03-08 2020-02-24 2020-04-05 2020-03-24 2020-05-05 2020-05-15 2020-06-09 2020-06-22 2020-07-14 2020-12-16 2021-07-14 Information Management Based Selection of the Scholarship, Research System and Innovation Fund Component 1: Capacity KE-ICIPE-158059-CS-CQS / Development for the Consultant SHORT TERM IDA / D3470 operation and management Post Qualification Limited 9,000.00 400.00 Completed 2020-02-07 2020-02-06 2020-02-21 2020-02-07 2020-03-22 2020-04-26 2020-03-18 2020-10-23 2020-12-17 COMMUNICATION'S of the Scholarship, Research Selection CONSULTANT and Innovation Fund KE-ICIPE-209698-CS-QCBS / Component 1: Capacity Communications and Development for the Quality And Cost- Under Outreach Consultancy Services IDA / D3470 operation and management Post Open - National 77,000.00 102,821.64 2020-12-18 2020-12-13 2021-01-08 2021-02-21 2021-02-01 2021-03-21 2021-03-12 2021-04-20 2021-04-07 2021-05-25 2021-04-26 2021-06-29 2022-06-29 Based Selection Implementation for the Regional Scholarship of the Scholarship, Research and Innovation Fund (RSIF). and Innovation Fund KE-ICIPE-216035-CS-CQS / Component 1: Capacity Consultancy Services for Development for the Consultant Planning and facilitation of IDA / D3470 operation and management Post Qualification Limited 20,000.00 24,000.00 Signed 2021-01-26 2021-01-26 2021-02-09 2021-02-12 2021-03-11 2021-03-05 2021-04-15 2021-04-12 2021-10-12 the first Regional Scholarship of the Scholarship, Research Selection and Innovation Fund (RSIF) and Innovation Fund Annual Conference KE-ICIPE-236271-CS-CQS / Consultant to design and Consultant deliver a business incubation Component 2: Scholarships IDA / D3470 Post Qualification Limited 9,000.00 0.00 Canceled 2021-05-31 2021-05-31 2021-06-14 2021-07-14 2021-08-18 2022-02-14 workshop for entrepreneurial and research grants for ASET Selection scientists implementing RSIF funded innovation projects INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-ICIPE-110946-CS-INDV / Component 1: Capacity French-English translation Development for the Individual services (as we wait for the IDA / D3470 operation and management Post Consultant Limited 5,000.00 0.12 Completed 2019-04-17 2019-04-18 2019-04-18 2019-04-18 2019-05-09 2019-05-03 2019-06-13 2019-05-03 2019-12-10 2019-07-31 firm selection, we need to of the Scholarship, Research Selection translate basic documents and Innovation Fund now) Page 2 KE-ICIPE-114112-CS-CDS / Component 1: Capacity Development of safeguards Development for the and grievance redress IDA / D3470 operation and management Post Direct Selection Direct 10,000.00 29,700.00 Terminated 2019-05-08 2019-03-21 2019-05-18 2019-04-04 2019-07-22 2019-05-27 2020-01-18 mechanism framework for the of the Scholarship, Research RSIF Project (Social Risk and Innovation Fund Management) KE-ICIPE-126285-CS-CDS / Hiring of a consultant to facilitate a team building Component 1: Capacity exercise for RSIF staff. Development for the The team will spend 2-3 days, IDA / D3470 operation and management Post Direct Selection Direct 3,500.00 3,352.60 Completed 2019-08-06 2019-08-08 2019-08-16 2019-08-13 2019-10-20 2019-10-09 2020-04-17 2019-10-24 but for part of the time, the of the Scholarship, Research consultant facilitate the team and Innovation Fund building discussions and activities. KE-ICIPE-141202-CS-INDV / An individual consultant to Individual Component 2: Scholarships facilitate and deliver grants IDA / D3470 Post Consultant Open 15,000.00 14,000.00 Signed 2019-10-18 2019-10-25 2019-12-20 2019-11-28 2020-01-10 2019-12-11 2020-02-14 2019-12-27 2020-08-12 and research grants for ASET proposal writing workshop for Selection RSIF African Host Universities Component 1: Capacity KE-ICIPE-159375-CS-INDV / Development for the Individual Consultancy for Social Risk IDA / D3470 operation and management Post Consultant Open 18,000.00 16,000.00 Signed 2020-02-14 2020-02-14 2020-03-20 2020-04-15 2020-04-10 2020-04-10 2020-05-15 2020-05-01 2020-11-11 Management Capacity of the Scholarship, Research Selection Strengthening and Innovation Fund KE-ICIPE-210023-CS-INDV / Component 1: Capacity Consultancy Services for Development for the Individual design and development of a IDA / D3470 operation and management Post Consultant Open 20,000.00 18,000.00 Signed 2020-12-15 2020-12-15 2021-02-02 2021-03-17 2021-02-23 2021-04-06 2021-03-30 2021-05-11 2021-09-26 mentorship platform for the of the Scholarship, Research Selection Regional Scholarship and and Innovation Fund Innovation Fund KE-ICIPE-218866-CS-INDV / Component 1: Capacity Individual Consultancy Development for the Individual Services for Communications IDA / D3470 operation and management Post Consultant Limited 15,000.00 19,500.00 Signed 2021-02-10 2021-02-12 2021-02-15 2021-02-12 2021-03-08 2021-03-24 2021-04-12 2021-04-18 2021-10-09 for the Regional Scholarship of the Scholarship, Research Selection and Innovation Fund and Innovation Fund KE-ICIPE-239182-CS-INDV / Individual consultant to Component 1: Capacity design and deliver a business Development for the Individual Under incubation workshop for IDA / D3470 operation and management Post Consultant Limited 9,000.00 0.00 2021-06-11 2021-06-01 2021-06-16 2021-06-02 2021-07-07 2021-08-11 2022-02-07 Implementation entrepreneurial scientists of the Scholarship, Research Selection implementing RSIF funded and Innovation Fund innovation projects Page 3 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: March 2017] 2. Date of General Procurement Notice: Sep 28, 2015 3. Period covered by this procurement plan: The procurement period of project covered from year March 2017 till April 2017. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 4 million All 2. NCB (Goods) Above US$ 4 million First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 2. Prequalification. Bidders for works activities shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank loan Project issued by The Council For Development and Reconstruction. 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) Review P-Q Expected Contract Proc. by Bank Ref. No. (Yes/No Bid Opening (Description) Method (Prior/Pos ) Date t) Expansion of sewage collection to QC1W1 ICB/NCB No Prior March 2017 connect to the Zahlé WWTP Expansion of sewage network to September QC1W2 ICB/NCB No Prior connect to the Anjar WWTP 2018 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2 million 2. Single Source (Firms) All 3. Individual Above US$ 400,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule Expected Review by Selection Proposals Ref. No. Description of Assignment Bank Method Submission (Prior/Post) Date Post Supervision of sewage collection to QC1C1 QCBS (Prior of March 2017 connect to the Zahlé WWTP TOR) Post Design of sewage network to connect to QC1C2 SSS (Prior of March 2017 the Anjar WWTP TOR) Post Supervision of sewage network to December QC1C3 QCBS (Prior of connect to the Anjar WWTP 2018 TOR) Post Design and supervision of sewage September QC1C4 QCBS (Prior of network to connect to the Aitanit WWTP 2017 TOR) SSS QC2C1 Promote the use of GAP, including IPM Prior March 2017 (FAO) Post Technical studies and training in solid September QC3C1 QCBS (Prior of waste management - MoE 2017 TOR) Post QC3C2 Water expert- LRA IC (Prior of TOR) Post QC3C3 Communication expert - LRA IC (Prior of TOR) Post QC3C6 Capacity building and training BWE (Prior of TOR) Post QC3C8 Capacity building and training of MoEW (Prior of TOR) PMU and training (part-time procurement; Prior of QC3C11 part-time environmental/social; part time IC TORs FM) Post QC3C12 Audit report LCS (Prior of February 2016 TOR) PROCUREMENT Lebanon : Lake Qaraoun Pollution Prevention Project PLAN General Information Country: Lebanon Bank’s Approval Date of the Original Procurement Plan: 2017-03-27 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147854 GPN Date: Project Name: Lake Qaraoun Pollution Prevention Project Loan / Credit No: IBRD / 86370 Council for Development and Reconstruction Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1W1 / Expansion of Component 1: Improvement Single Stage - One 10,539,562. 2020-03- sewage collection to connect IBRD / 86370 of Municipal Sewage Prior Request for Bids Open - International Signed 2017-03-27 2017-03-31 2017-03-29 2017-06-02 2017-06-02 2017-08-01 2017-10-04 2017-09-15 2017-10-13 Envelope 49 15 to the Zahlé WWTP Collection QC1W2 / Expansion of Component 1: Improvement Under Single Stage - One 2022-12- sewage network to connect to IBRD / 86370 of Municipal Sewage Prior Request for Bids Open - International 0.00 Implementat 2018-08-30 2020-12-01 2018-09-29 2021-01-08 2018-12-28 2021-02-18 2019-03-28 2019-06-11 Envelope 10 the Anjar WWTP Collection ion QC1W3 / Expansion of Component 1: Improvement Single Stage - One 2,522,112.6 2020-12- sewage network to connect to IBRD / 86370 of Municipal Sewage Post Request for Bids Open - National Signed 2018-04-16 2018-05-10 2018-05-16 2018-05-31 2018-06-30 2018-07-31 2018-09-28 2019-05-30 2018-12-12 2019-12-09 Envelope 2 11 the Aitanit WWTP Collection QC1W2A / Expansion of the Request for Wastewater Collection Component 1: Improvement Bids - Works Networks (Anjar, Majdel Anjar Single Stage - One 2023-06- IBRD / 86370 of Municipal Sewage Prior Request for Bids Open - International (without 0.00 Canceled 2021-06-03 2021-06-10 2021-09-09 2021-11-04 2021-12-16 & Qabb Elias) to Connect to Envelope 15 Collection prequalificati Anjar El Marj Wastewater on) SPD Treatment Plant – Lot 1 QC1W2B / Expansion of the Request for Wastewater Collection Component 1: Improvement Bids - Works Pending Networks (Anjar, Majdel Anjar Single Stage - One 2023-06- IBRD / 86370 of Municipal Sewage Prior Request for Bids Open - International (without 0.00 Implementat 2021-06-10 2021-06-17 2021-09-16 2021-11-11 2021-12-30 & Qabb Elias) to Connect to Envelope 29 Collection prequalificati ion Anjar El Marj Wastewater on) SPD Treatment Plant – Lot 1 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3. Solid Waste Under QC3G1 / Purchase of water Management, Water Quality IBRD / 86370 Post Direct Selection Direct 0.00 Implementati 2018-07-18 2019-05-27 2018-07-23 2018-10-06 2019-04-04 monitoring stations Monitoring, Capacity Building on and Project Management NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1C1 / Supervision of Component 1: Improvement Quality And Cost- sewage collection to connect IBRD / 86370 of Municipal Sewage Post Open - International 378,622.27 Signed 2016-10-28 2016-10-28 2016-12-08 2017-05-02 2017-07-31 2017-07-01 2017-09-14 2017-07-31 2017-11-13 2017-09-09 2018-01-03 2017-11-23 2018-03-26 2021-05-24 Based Selection to the Zahlé WWTP Collection Component 2. Promotion of QC2C1 / Promote the use of Good Agricultural Practices UN Agencies IBRD / 86370 Prior Direct 1,500,000.00 Under Review 2017-06-08 2017-06-09 2021-06-08 GAP, including IPM (Including Integrated Pest (Direct) Management) QC1C3 / Supervision of Component 1: Improvement Quality And Cost- Under sewage network to connect to IBRD / 86370 of Municipal Sewage Prior Open - International 0.00 2018-08-30 2019-11-06 2018-09-29 2020-01-15 2019-01-27 2020-11-11 2019-02-26 2021-02-12 2019-03-28 2021-04-08 2019-05-27 2019-08-10 2023-02-08 Based Selection Implementation the Anjar WWTP Collection Component 3. Solid Waste QC3C1A / Studies for Closure Management, Water Quality Quality And Cost- and Rehabilitation of Bar Elias IBRD / 86370 Post Open - National 67,237.25 Signed 2018-08-02 2019-06-06 2018-08-02 2018-08-02 2019-12-16 2019-05-03 2020-02-03 2019-05-31 2020-06-17 2019-07-12 2020-07-22 2019-08-30 2020-11-09 2020-06-30 Monitoring, Capacity Building Based Selection Dumpsite and Project Management QC3C1B / Studies for the Component 3. Solid Waste Assessment of Odor Impact Management, Water Quality Quality And Cost- IBRD / 86370 Post Open - International 72,944.54 Signed 2018-08-02 2018-08-02 2018-08-02 2019-06-10 2018-08-02 2019-12-16 2019-05-31 2020-02-19 2019-06-28 2020-06-17 2019-08-09 2020-07-29 2019-09-27 2021-04-09 2020-05-29 from Solid Waste Management Monitoring, Capacity Building Based Selection Facilities and Landfills and Project Management Component 3. Solid Waste QC3C2 / LRA Water Management, Water Quality Quality And Cost- IBRD / 86370 Post Open - International 0.00 Canceled 2018-08-02 2018-06-30 2018-08-02 2019-05-03 2018-08-02 2019-10-11 2019-04-15 2020-02-18 2019-05-13 2019-06-24 2019-08-12 2021-02-15 Governance Study Monitoring, Capacity Building Based Selection and Project Management QC3C12 / Website for Litani Component 3. Solid Waste River (20 weeks) + 1-year Management, Water Quality Quality And Cost- IBRD / 86370 Post Open - National 63,314.50 Signed 2018-08-30 2018-09-05 2018-08-30 2018-08-30 2019-01-17 2019-03-07 2019-03-07 2019-04-04 2019-03-28 2019-05-16 2019-06-11 2019-07-04 2019-10-17 2022-07-04 Maintenance + 3-year Monitoring, Capacity Building Based Selection Hosting and Project Management QC1C4B / Supervision of Component 1: Improvement Quality And Cost- sewage network to connect to IBRD / 86370 of Municipal Sewage Post Open - National 62,344.00 Signed 2018-04-16 2019-04-16 2018-12-28 2019-04-18 2019-05-02 2019-05-16 2019-05-24 2019-06-13 2019-07-17 2019-07-04 2019-11-27 2019-08-01 2020-03-02 2020-07-31 Based Selection the Aitanit WWTP Collection Page 1 QC3C1C / Strategic Component 3. Solid Waste Environmental and Social Management, Water Quality Quality And Cost- Under Assessment Study for the IBRD / 86370 Post Open - International 104,925.00 2019-09-19 2019-07-04 2019-10-31 2020-04-23 2019-12-26 2020-12-11 2020-02-20 2021-02-16 2020-03-19 2021-03-11 2020-04-23 2021-04-22 2020-06-01 2021-03-31 Monitoring, Capacity Building Based Selection Implementation National Integrated Solid and Project Management Waste Strategy Component 3. Solid Waste QC3C7B / Upgrading IT Management, Water Quality Quality And Cost- Under IBRD / 86370 Post Open - National 0.00 2020-06-16 2020-09-29 2020-07-14 2021-02-25 2020-08-11 2020-09-08 2020-09-29 2020-10-20 2020-12-01 2021-05-31 System - BWE Monitoring, Capacity Building Based Selection Implementation and Project Management INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1C2 / Design of sewage Component 1: Improvement network to connect to the IBRD / 86370 of Municipal Sewage Post Direct Selection Direct 392,500.00 Signed 2017-03-22 2017-03-22 2017-06-30 2017-06-29 2017-09-03 2017-10-09 2018-07-04 Anjar WWTP Collection Component 3. Solid Waste Individual QC3C5A / Administration Management, Water Quality IBRD / 86370 Prior Consultant Direct 253,304.25 Signed 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-07-01 2016-07-01 2017-06-30 Officer– BWE Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual Management, Water Quality QC3C5B / Assistant– BWE IBRD / 86370 Post Consultant Direct 37,479.72 Completed 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-07-01 2016-07-01 2017-06-30 2019-06-30 Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C9 / Solid waste expert - Management, Water Quality IBRD / 86370 Post Consultant Open 132,000.00 Signed 2016-11-14 2016-11-14 2017-03-23 2017-03-23 2017-03-23 2017-03-23 2017-06-06 2017-06-06 2018-05-04 MOE Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C10 / Project Management, Water Quality IBRD / 86370 Prior Consultant Open 277,860.00 Signed 2015-08-06 2015-08-06 2015-11-25 2015-11-25 2015-11-25 2015-11-25 2017-07-06 2016-11-01 2018-06-04 management– CDR Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C4 / Wastewater Management, Water Quality Under IBRD / 86370 Post Consultant Open 38,500.00 2016-12-28 2016-12-28 2017-06-30 2017-06-09 2017-07-15 2017-09-03 2018-08-02 engineer - BWE Monitoring, Capacity Building Implementation Selection and Project Management Component 3. Solid Waste Individual QC3C7 / Financial officer - Management, Water Quality IBRD / 86370 Post Consultant Open 0.00 Canceled 2016-12-28 2017-06-08 2017-07-08 2017-08-12 2018-07-11 BWE Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C7A / Financial Officer - Management, Water Quality IBRD / 86370 Post Consultant Open 167,200.00 Signed 2017-08-02 2017-08-02 2017-11-13 2017-11-13 2017-11-23 2017-11-23 2018-02-06 2018-02-01 2019-01-05 BWE Monitoring, Capacity Building Selection and Project Management Component 1: Improvement QC1C5 / ESMP/LAP Anjar and IBRD / 86370 of Municipal Sewage Post Direct Selection Direct 66,383.00 Signed 2017-04-21 2017-04-21 2017-06-05 2017-05-01 2017-09-07 2017-09-29 2018-05-05 Aitanit Collection Component 3. Solid Waste Individual QC3C11A / Financial Officer Management, Water Quality IBRD / 86370 Post Consultant Direct 149,450.40 Signed 2017-09-13 2017-09-13 2017-09-13 2017-09-13 2017-09-13 2017-11-03 2017-11-15 2018-10-02 - CDR Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C11B / Procurement Management, Water Quality IBRD / 86370 Post Consultant Open 122,760.00 Signed 2017-12-14 2017-12-14 2018-03-14 2018-04-30 2018-04-04 2018-07-02 2018-06-18 2018-07-02 2019-05-19 Officer Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste QC3C1 / Lower Litani Management, Water Quality Environment and Investment IBRD / 86370 Post Direct Selection Direct 196,000.00 Completed 2017-05-04 2017-05-04 2017-09-05 2017-09-05 2018-01-19 2018-02-12 2019-01-14 2019-03-15 Monitoring, Capacity Building Plan - MoE and Project Management QC1C4A / Design of sewage Component 1: Improvement network to connect to the IBRD / 86370 of Municipal Sewage Post Direct Selection Direct 17,560.00 Completed 2018-05-10 2018-05-10 2018-04-12 2018-11-07 2018-11-07 2018-12-07 2018-12-06 Aitanit WWTP Collection Component 3. Solid Waste QC3C6B / Individual Individual Management, Water Quality Under Consultant Wastewater Sector IBRD / 86370 Post Consultant Open 0.00 2018-06-10 2019-04-10 2019-06-07 2020-02-20 2019-06-28 2019-08-16 2020-07-15 Monitoring, Capacity Building Implementation - MOEW Selection and Project Management Component 3. Solid Waste Individual QC3C11C / Environmental Management, Water Quality IBRD / 86370 Post Consultant Open 111,840.00 Signed 2018-06-10 2018-05-22 2018-10-11 2018-08-16 2018-10-25 2018-12-26 2018-12-26 2018-12-26 2019-09-30 and Social Officer - CDR Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C11D / Project Engineer Management, Water Quality IBRD / 86370 Post Consultant Open 79,200.00 Signed 2018-11-30 2018-11-30 2019-06-07 2019-09-17 2019-06-28 2019-09-19 2019-08-16 2019-11-26 2020-07-15 - CDR Monitoring, Capacity Building Selection and Project Management QC1C4 / Supervision of Component 1: Improvement sewage network to connect to IBRD / 86370 of Municipal Sewage Post Direct Selection Direct 0.00 Canceled 2018-04-16 2018-05-06 2018-08-19 2020-12-11 the Aitanit WWTP Collection QC3C13 / Consultancy Services for the Preparation of Component 3. Solid Waste a Feasibility Study for Management, Water Quality IBRD / 86370 Post Direct Selection Direct 104,294.80 Signed 2019-01-08 2020-01-24 2019-10-01 2020-01-22 2019-12-31 2020-08-25 2020-05-30 Sustainable Sludge Monitoring, Capacity Building Management in the Bekaa and Project Management Region Component 3. Solid Waste QC3C6A / Focal Point - Management, Water Quality IBRD / 86370 Post Direct Selection Direct 99,000.00 Signed 2019-07-17 2019-07-30 2019-07-30 2019-07-25 2019-10-01 2020-03-02 2020-08-31 MoEW Monitoring, Capacity Building and Project Management Page 2 Component 3. Solid Waste QC3C11E / Rockwise PMIS Management, Water Quality IBRD / 86370 Post Direct Selection Direct 20,497.50 Signed 2020-01-01 2020-01-17 2020-01-21 2020-01-21 2020-03-10 2020-03-10 2020-12-31 Software Maintenance - CDR Monitoring, Capacity Building and Project Management QC3C6C / Updating the Component 3. Solid Waste Strategic Environmental and Management, Water Quality Under Social Assessment (SESA) of IBRD / 86370 Post Direct Selection Direct 99,973.00 2020-12-10 2021-01-28 2020-12-24 2021-03-17 2021-03-04 2021-12-03 Monitoring, Capacity Building Implementation the Updated National Water and Project Management Sector Strategy - MoEW Component 3. Solid Waste Individual QC3C11F / Environmental Management, Water Quality Under IBRD / 86370 Post Consultant Open 0.00 2020-12-10 2020-12-01 2021-02-04 2021-02-18 2021-04-01 2022-02-28 and Social Officer - CDR Monitoring, Capacity Building Implementation Selection and Project Management Component 3. Solid Waste Individual QC3C9A / Solid Waste Expert Management, Water Quality IBRD / 86370 Post Consultant Open 3,900.00 Signed 2020-12-10 2020-12-01 2021-02-04 2021-03-01 2021-02-18 2021-03-11 2021-04-01 2021-05-17 2022-02-28 - MoE Monitoring, Capacity Building Selection and Project Management Page 3 PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of Congo - SME Development and Growth Project P160806 Project Implementation agency: CFEF (PPA) Date of the Procurement Plan: November 27, 2017 Period covered by this Procurement Plan: December 2017 – May 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Borrower’s Public Procurement Law No 10/010 of April 27, 2010 (PPL) and the Manual of Procedures of the PPL as per Borrower’s Decree No 10/22 of June 2, 2010, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Standard Bidding Documents: All standard bidding documents to be used for the Project under NCB shall be found acceptable to the World Bank before their use during the implementation of Project; (b) Eligibility: Eligibility of bidders and acceptability of their goods and services shall not be based on their nationality and/or their origin; and association with a national firm shall not be a condition for participation in a bidding process. Therefore, except for the ineligibility situations referred to in paragraphs 1.10(a) (i) and 1.10(a) (ii) of the Procurement Guidelines, the eligibility of bidders must be based solely on their qualification, experience and capacity to carry out the contract related to the specific bidding process; (c) Advertising and Bid Preparation Time: Bidding opportunities shall be advertised at least in a national newspaper of wide circulation and on the website of the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) and bidders should be given at least 30 days from the date of invitation to bid or the date of availability of the bidding documents, whichever is later; (d) Criteria for Qualification of Bidders: Qualification criteria shall only concern the bidder’s capability and resources to perform the contract taking into account objective and measurable factors. Such criteria for qualification of bidders shall be clearly specified in the bidding documents; (e) Bid Evaluation and Contract Award: A contract shall be awarded to the substantially responsive and lowest evaluated bidder provided that such bidder meets the qualification criteria specified in the bidding documents. No scoring system shall be allowed for the evaluation of bids, and no “blanket” limitation to the number of lots which can be awarded to a bidder shall apply. The criteria for bid evaluation and the contract award conditions shall be clearly specified in the bidding documents; (f) Preferences: No preference shall be given to domestic/regional bidders; to domestically/regionally manufactured goods; and to bidders forming a joint venture with a national firm or proposing national sub-contractors or carrying out economic activities in the territory of the Recipient; (g) Publication of Contract Award: Information on all contract awards shall be published in at least a national newspaper of wide circulation or in the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) web-site; (h) Fraud and Corruption: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy to sanction firms or individuals found to have engaged in fraud and corruption as set forth in the Procurement Guidelines; (i) Inspection and Audit Rights: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy with respect to inspection and audit of accounts, records and other documents relating to the bid submission and contract performance; (j) Requirement for administrative documents and/or tax clearance certificate: The bidding documents shall not require foreign bidders to produce any administrative or tax related certificates prior to confirmation of awarding a contract; and (k) Modifications of a Signed Contract: Any change in the contract amount which, singly or combined with all previous changes, increases the original contract amount by fifteen (15) percent or more must be done through an amendment to the signed contract instead of signing a new contract. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. “Not Applicable” PROCUREMENT Congo, Democratic Republic of : DRC- SME Development and Growth Project PLAN General Information Country: Congo, Democratic Republic of Bank’s Approval Date of the Original Procurement Plan: 2019-03-26 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160806 GPN Date: 2019-08-22 Project Name: DRC- SME Development and Growth Project Loan / Credit No: IDA / 62870 U Executing Agency(ies): nité de Coordination d'Appui au Développement des Micros, Petites et Moyennes Entreprises WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-UCP-PADMPME-164487- GO-DIR / Firme Tomate pour Component 3: Capacity l'acquisition du logiciel Tom IDA / 62870 building and Project Post Direct Selection Direct 75,000.00 36,239.70 Signed 2020-04-30 2020-03-31 2020-05-05 2020-02-12 2020-06-09 2020-07-13 2020-12-06 Monitoring , l'installation, le Management parametrage et fomation des utilisateurs au PADMPME ZR-UCP-PADMPME-164510- Component 3: Capacity GO-RFQ / Acquisition de Request for Single Stage - One IDA / 62870 building and Project Post Limited 260,000.00 255,000.00 Completed 2020-05-03 2020-07-24 2020-06-28 2020-09-18 2020-12-25 2020-11-10 matériels roulant pour les Quotations Envelope Management besoins de l'UCP-PADMPME ZR-UCP-PADMPME-167524- GO-RFQ / Acquisition de Component 3: Capacity Request for Single Stage - One matériel informatique IDA / 62870 building and Project Post Limited 12,150.00 16,850.00 Signed 2020-05-05 2020-07-13 2020-06-30 2020-08-18 2020-12-27 Quotations Envelope supplémentaire pour les Management besoins de l'UCP PADMPME ZR-UCP-PADMPME-167526- Component 3: Capacity GO-RFQ / Acquisition de Request for Single Stage - One IDA / 62870 building and Project Post Limited 26,040.00 12,168.78 Completed 2020-05-04 2020-10-29 2020-06-29 2020-11-19 2020-12-26 2020-12-15 fournitures de bureau et Quotations Envelope Management consommables informatiques ZR-UCP-PADMPME-167528- GO-RFQ / Acquisition de Component 3: Capacity Request for Single Stage - One mobiliers de bureau IDA / 62870 building and Project Post Limited 6,000.00 7,174.60 Completed 2020-05-05 2020-07-15 2020-06-30 2020-09-17 2020-12-27 2020-09-23 Quotations Envelope supplémentaire pour les Management besoins de l'UCP PADMPME ZR-UCP-PADMPME-205735- GO-RFQ / Acquisition de Component 3: Capacity Request for Single Stage - One matériel performant pour IDA / 62870 building and Project Post Open - National 45,000.00 42,125.50 Signed 2020-12-21 2021-02-15 2021-03-12 2021-08-14 Quotations Envelope faciliter les séances de Management visioconférence à l'UCP. ZR-UCP-PADMPME-218525- GO-RFB / Acquisition de Component 1: Support téléphones mobiles ( entrepreneurship Single Stage - One IDA / 62870 Post Request for Bids Open - National 700,000.00 396,720.00 Signed 2021-03-02 2021-02-25 2021-03-07 2021-03-04 2021-04-18 2021-03-30 2021-05-18 2021-04-19 2021-06-22 2021-06-14 2021-12-19 portables) pour les femmes opportunities for youth and Envelope bénéficiaires du FIP à Goma women et Lubumbashi ZR-UCP-PADMPME-226485- GO-RFQ / Acquisition de fournitures de bureau pour Component 3: Capacity Request for Single Stage - One l’unité de coordination du IDA / 62870 building and Project Post Limited 7,200.00 4,563.21 Signed 2021-04-17 2021-04-06 2021-06-12 2021-06-09 2021-12-09 Quotations Envelope projet de développement des Management micros, petites et moyennes entreprises ZR-UCP-PADMPME-226486- GO-RFQ / Acquisition de consommables informatiques Component 3: Capacity Request for Single Stage - One pour l’unité de coordination IDA / 62870 building and Project Post Limited 4,520.00 3,780.00 Completed 2021-04-17 2021-04-28 2021-06-12 2021-06-02 2021-12-09 2021-06-08 Quotations Envelope du projet de développement Management des micros, petites et moyennes entreprises ZR-UCP-PADMPME-226600- GO-RFQ / Acquisition de Component 1: Support Under 3600 cartes SIM ainsi que entrepreneurship Request for Single Stage - One IDA / 62870 Post Limited 220,000.00 0.00 Implementati 2021-05-01 2021-04-29 2021-06-26 2021-12-23 l'abonnement internet pour opportunities for youth and Quotations Envelope on les téléphones des femmes women entrepreneures ZR-UCP-PADMPME-226607- GO-RFQ / Acquisition d’un Component 3: Capacity Under Request for Single Stage - One groupe électrogène de IDA / 62870 building and Project Post Limited 18,000.00 0.00 Implementati 2021-03-31 2021-03-24 2021-05-26 2021-11-22 Quotations Envelope l’Antenne provinciale de Management on Lubumbashi NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-UCP-PADMPME-154549- NC-RFQ / Selection d'une agence d'organisation évenementielle pour Component 3: Capacity Request for Single Stage - One l'assistance à l'organisation du IDA / 62870 building and Project Post Limited 150,000.00 77,453.20 Signed 2020-01-25 2020-01-24 2020-03-21 2020-02-06 2020-09-17 Quotations Envelope Lancement solonnel et de Management l'atelier technique de présentation du projet PADMPME Page 1 ZR-UCP-PADMPME-167532- Component 3: Capacity Request for Single Stage - One NC-RFQ / Service d'entretien IDA / 62870 building and Project Post Limited 4,800.00 4,529.96 Signed 2020-05-05 2020-09-23 2020-06-30 2020-11-18 2020-12-27 Quotations Envelope de matériel de climatisation Management ZR-UCP-PADMPME-200922- NC-DIR / Location de la Component 3: Capacity bande passante auprès de la IDA / 62870 building and Project Post Direct Selection Direct 133,632.00 133,408.00 Signed 2020-10-21 2020-12-02 2020-10-22 2020-03-02 2020-10-25 2020-07-17 2021-10-25 firme GBS pour la connection Management internet ZR-UCP-PADMPME-205582- NC-DIR / Contractualisation Component 1: Support avec la firme HOLOGRAM pour entrepreneurship IDA / 62870 Post Direct Selection Direct 97,442.00 97,442.00 Signed 2020-11-23 2020-11-20 2020-11-28 2020-09-11 2021-01-02 2021-03-25 2021-07-01 l'informatisation du processus opportunities for youth and de gestion de l'administration women des permis de construire ZR-UCP-PADMPME-226581- NC-RFB / Recrutement d'un Cabinet en charge de Component 1: Support Under l’organisation matérielle entrepreneurship Single Stage - One IDA / 62870 Post Request for Bids Open - National 300,000.00 0.00 Implementati 2021-04-19 2021-05-07 2021-04-24 2021-06-05 2021-07-05 2021-08-09 2022-02-05 (support) de la formation IP au opportunities for youth and Envelope on profit des femmes micro- women entrepreneures dans les villes de Goma et Lubumbashi ZR-UCP-PADMPME-226588- NC-RFB / Recrutement d'un Component 1: Support cabinet en charge de Under entrepreneurship Single Stage - One l’organisation matérielle IDA / 62870 Post Request for Bids Open - National 500,000.00 0.00 Implementati 2021-04-19 2021-05-07 2021-04-24 2021-06-05 2021-07-05 2021-08-09 2022-02-05 opportunities for youth and Envelope (support) de la formation STEP on women sous la supervision du cabinet MOVE CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-UCP-PADMPME-106197- CS-QBS / Consultant firme Component 2. SME Quality Based (cabinet/ONG) pour la mise en IDA / 62870 Prior Open - International 4,800,000.00 0.00 Canceled 2019-04-15 2019-04-12 2019-05-15 2019-05-15 2019-06-28 2019-07-26 2019-08-25 2019-09-24 2019-10-29 2020-10-28 Development Selection ouvre des Centres de Petites et Moyennes Entreprises ZR-UCP-PADMPME-106289- CS-QBS / Recrutement d'un Component 1: Support Consultant firme entrepreneurship Quality Based IDA / 62870 Prior Open - International 15,000,000.00 0.00 Canceled 2019-05-20 2019-04-12 2019-06-17 2019-05-16 2019-07-31 2019-08-28 2019-09-27 2019-10-27 2019-12-01 2020-11-30 (cabinet/ONG) pour la mise en opportunities for youth and Selection oeuvre du soutien aux women femmes entrepreneurs ZR-UCP-PADMPME-106312- CS-QBS / Recrutement d'un Component 1: Support Consultant firme entrepreneurship Quality Based IDA / 62870 Prior Open - International 8,000,000.00 0.00 Canceled 2019-06-14 2019-07-14 2019-08-27 2019-09-24 2019-10-24 2019-11-23 2019-12-28 2020-12-27 (Cabinet/ONG) chargée de la opportunities for youth and Selection dissémination des textes de women lois sur le genre ZR-UCP-PADMPME-106187- CS-QBS / Recrutement d'un Component 1: Support Consultant firme entrepreneurship Quality Based IDA / 62870 Prior Open - International 54,000,000.00 0.00 Canceled 2019-03-31 2019-04-12 2019-04-30 2019-05-15 2019-06-13 2019-07-11 2019-08-10 2019-09-09 2019-10-14 2022-10-13 (Cabinet/ONG) pour la mise opportunities for youth and Selection en oeuvre des Concours des women Plans d'Affaires ZR-UCP-PADMPME-106204- CS-QBS / Consultant firme(cabinet/ONG) chargée Component 3: Capacity de l'appui à la création des Quality Based IDA / 62870 building and Project Prior Open - International 4,000,000.00 0.00 Canceled 2019-05-02 2019-04-12 2019-06-01 2019-05-16 2019-07-15 2019-08-12 2019-09-11 2019-10-11 2019-11-15 2022-11-14 marchés pour les services Selection Management d'accompagnement des entrepreuneurs et de petites et moyennes entreprises ZR-UCP-PADMPME-133764- CS-QBS / Consultant firme Component 3: Capacity chargé de l'Appui à la création Quality Based IDA / 62870 building and Project Prior Open - International 1,000,000.00 3,523,366.33 Signed 2019-09-20 2019-10-17 2019-10-11 2019-10-31 2019-11-24 2019-11-18 2019-12-22 2020-01-20 2020-01-21 2020-02-10 2020-02-20 2020-09-02 2020-03-26 2020-09-18 2021-03-26 des marchés pour les services Selection Management d'accompagnement des entrepreneurs et des PME ZR-UCP-PADMPME-133767- CS-QBS / Consultant firme Component 2. SME Quality Based (Cabinet/ONG) chargé de IDA / 62870 Prior Open - International 1,000,000.00 2,500,211.00 Signed 2019-09-19 2019-10-17 2019-10-10 2019-11-11 2019-11-23 2019-11-22 2019-12-21 2020-02-06 2020-01-20 2020-06-08 2020-02-19 2020-09-12 2020-03-25 2020-10-05 2021-03-25 Development Selection mettre en oeuvre les Centres des PME ZR-UCP-PADMPME-133748- Component 1: Support CS-QBS / Consultant firme entrepreneurship Quality Based (Cabinet/ONG)chargé du IDA / 62870 Prior Open - International 2,500,000.00 0.00 Canceled 2019-09-13 2019-10-17 2019-10-04 2019-11-11 2019-11-17 2019-12-02 2019-12-15 2020-02-05 2020-01-14 2020-02-25 2020-02-13 2020-09-14 2020-03-19 2021-03-19 opportunities for youth and Selection soutien aux femmes women entrepreneurs ZR-UCP-PADMPME-133613- Component 1: Support CS-QBS / Recrutement d'une entrepreneurship Quality Based firme (cabinet/ONG) chargée IDA / 62870 Prior Open - International 7,900,000.00 7,679,850.48 Signed 2019-09-17 2019-10-18 2019-10-08 2019-11-01 2019-11-21 2019-11-05 2019-12-19 2020-01-15 2020-01-18 2020-01-23 2020-02-17 2020-06-11 2020-03-23 2020-06-27 2021-03-23 opportunities for youth and Selection de la mise en oeuvre des women concours des plans d'affaires ZR-UCP-PADMPME-140589- CS-CQS / Recrutement d'un Component 1: Support Cabinet chargé de conduire Consultant entrepreneurship l'enquête de base de IDA / 62870 Post Qualification Limited 252,000.00 250,013.00 Signed 2019-10-25 2019-11-12 2019-11-08 2020-01-30 2019-12-08 2020-03-13 2020-01-12 2020-03-30 2020-07-10 opportunities for youth and l'évaluation d'impact de la Selection women formation en Initiative Personnelle Page 2 ZR-UCP-PADMPME-147412- CS-QCBS / Recrutement d'un Cabinet de consultants chargé Component 3: Capacity de l'audit externe financier et Quality And Cost- IDA / 62870 building and Project Post Open - International 100,000.00 31,353.80 Signed 2019-12-04 2019-12-06 2019-12-25 2020-08-03 2020-02-07 2020-03-18 2020-03-06 2020-04-24 2020-04-05 2020-05-07 2020-05-10 2020-05-15 2020-06-14 2020-06-03 2021-06-14 comptable du projet Based Selection Management PADMPME pour les exercices clos au 31 décempbre 2018,2019 et 2020. ZR-UCP-PADMPME-147453- CS-CQS / Recrutement d'un Component 3: Capacity Consultant Cabinet de Consultants IDA / 62870 building and Project Post Qualification Limited 400,000.00 247,769.00 Signed 2019-12-04 2020-01-02 2019-12-18 2020-05-11 2020-01-17 2020-07-17 2020-02-21 2020-08-14 2020-08-19 chargé de réaliser l'enquête Management Selection de base du projet PADMPME ZR-UCP-PADMPME-147458- CS-CQS / Recrutement d'une Component 3: Capacity Consultant agence conseil pour le IDA / 62870 building and Project Post Qualification Open - International 100,000.00 98,468.75 Signed 2019-12-04 2019-12-17 2019-12-25 2020-08-06 2020-02-07 2020-07-08 2020-03-08 2020-08-31 2020-04-12 2020-09-22 2020-10-09 renforcement des actions de Management Selection communication du projet PADMPME ZR-UCP-PADMPME-164517- CS-CQS / Recrutement d'un consultant (ONG) chargé de Component 3: Capacity Consultant l'accompagnement sur la IDA / 62870 building and Project Post Qualification Open - National 150,000.00 119,107.40 Signed 2020-04-20 2020-04-30 2020-05-11 2020-11-17 2020-06-24 2020-11-27 2020-07-24 2021-03-24 2020-08-28 2021-04-09 2021-02-24 prévention des violences Management Selection basées sur le genre (VBG) et le VIH dans les sites du projet ZR-UCP-PADMPME-200903- CS-QCBS / Recrutement d'un Component 1: Support Cabinet de Consultants entrepreneurship Quality And Cost- Under chargé d'appuyer le IDA / 62870 Post Open - National 230,000.00 0.00 2020-11-26 2020-12-03 2020-12-17 2021-01-30 2021-02-27 2021-03-29 2021-05-03 2021-06-07 2022-06-07 opportunities for youth and Based Selection Implementation gouvernement dans le women renforcement du cadre institutionnel des petites et moyennes entreprises. ZR-UCP-PADMPME-205577- CS-QCBS / Recrutement d'un Component 1: Support Consultant (Cabinet) chargé entrepreneurship Quality And Cost- IDA / 62870 Prior Open - International 2,000,000.00 0.00 Under Review 2020-12-17 2021-02-01 2021-01-07 2021-02-15 2021-02-20 2021-03-20 2021-04-19 2021-05-24 2021-06-28 2022-06-28 de la formation et de opportunities for youth and Based Selection l'accompagnement des women femmes entrepreneurs ZR-UCP-PADMPME-205770- CS-CQS / Recrutement d'un Consultant ( cabinet/ONG/agence) chargé Consultant Component 2. SME Under de réaliser l'audit IDA / 62870 Post Qualification Open - National 250,000.00 0.00 2020-12-18 2021-01-27 2021-01-08 2021-03-10 2021-02-21 2021-03-23 2021-04-27 2021-10-24 Development Implementation environnemental et social des Selection premières petites et moyennes entreprises subventionnées par le projet ZR-UCP-PADMPME-215950- CS-CQS / Recrutement d'un Cabinet pour renforcer les Consultant Component 2. SME Under capacités des petites et IDA / 62870 Post Qualification Open - National 250,000.00 0.00 2021-02-27 2021-03-19 2021-03-20 2021-05-03 2021-06-02 2021-07-07 2022-01-03 Development Implementation moyennes entreprises Selection établies et les jeunes entrepreneurs ZR-UCP-PADMPME-215954- Component 1: Support CS-CQS / Recrutement d'un entrepreneurship Quality And Cost- Pending cabinet pour la révision de la IDA / 62870 Post Open - National 200,000.00 0.00 2021-03-10 2021-03-31 2021-05-14 2021-06-11 2021-07-11 2021-08-15 2021-09-19 2022-09-19 opportunities for youth and Based Selection Implementation stratégie nationale des petites women et moyennes entreprises ZR-UCP-PADMPME-226482- CS-QCBS / Recrutement d'un Cabinet de consultants chargé Component 3: Capacity de l'audit externe financier et Quality And Cost- Under IDA / 62870 building and Project Post Open - International 80,000.00 0.00 2021-06-21 2021-04-05 2021-07-12 2021-04-19 2021-08-25 2021-09-22 2021-10-22 2021-11-26 2021-12-31 2022-12-31 comptable du projet Based Selection Implementation Management PADMPME pour les exercices clos au 31 décempbre 2021,2022 et 2023. ZR-UCP-PADMPME-200910- CS-QCBS / Recrutement d'un Cabinet chargé Component 1: Support d'accompagner le entrepreneurship Quality And Cost- IDA / 62870 Prior Open - International 1,800,000.00 0.00 Canceled 2020-11-27 2020-12-18 2021-01-31 2021-02-28 2021-03-30 2021-05-04 2021-06-08 2022-06-08 gouvernement dans la opportunities for youth and Based Selection promotion du dialogue public- women privé , de l'OHADA ainsi que les mécanismes alternatifs de règlement des différends ZR-UCP-PADMPME-200523- CS-QCBS / Recrutement d'un Component 1: Support Consultant Cabinet entrepreneurship Quality And Cost- International chargé de la IDA / 62870 Prior Open - International 1,000,000.00 0.00 Canceled 2020-11-25 2021-04-10 2020-12-16 2021-01-29 2021-02-26 2021-03-28 2021-05-02 2021-06-06 2022-06-06 opportunities for youth and Based Selection finalisation du cadre juridique women des Petites et Moyennes Entreprises (PME) ZR-UCP-PADMPME-226484- CS-QCBS / Recrutement d’un Component 1: Support Consultant Cabinet chargé de entrepreneurship Quality And Cost- la promotion et la mise en IDA / 62870 Post Open - International 900,000.00 0.00 Canceled 2021-04-12 2021-05-03 2021-06-16 2021-07-14 2021-08-13 2021-09-17 2021-10-22 2022-10-22 opportunities for youth and Based Selection place des plateformes du women Dialogue Public-Privé dans les zones du Projet ZR-UCP-PADMPME-205724- CS-CQS / Recrutement d'un cabinet /partenaire local pour Component 1: Support assurer l'organisation entrepreneurship Quality And Cost- IDA / 62870 Post Open - International 500,000.00 0.00 Canceled 2021-02-28 2021-03-21 2021-05-04 2021-06-01 2021-07-01 2021-08-05 2021-09-09 2022-09-09 matérielle (support logistique) opportunities for youth and Based Selection des formations STEP au profit women des jeunes entrepreneurs dans les quatre villes du projet Page 3 ZR-UCP-PADMPME-205704- CS-CQS / Recrutement d'un cabinet /partenaire local pour Component 1: Support assurer l'organisation Consultant entrepreneurship matérielle (support logistique) IDA / 62870 Post Qualification Open - National 300,000.00 0.00 Canceled 2021-02-28 2021-03-21 2021-05-04 2021-06-03 2021-07-08 2022-01-04 opportunities for youth and des formations en IP au profit Selection women des femmes entrepreneurs éligibles dans les villes de Goma et Lubumbashi ZR-UCP-PADMPME-215940- CS-CQS / Recrutement d'un Component 1: Support Cabinet chargé de Consultant entrepreneurship l'identification des réformes IDA / 62870 Post Qualification Open - National 105,000.00 0.00 Canceled 2021-03-01 2021-02-12 2021-03-22 2021-05-05 2021-06-04 2021-07-09 2022-01-05 opportunities for youth and prioritaires sur le cadre Selection women juridique des petites et moyennes entreprises ZR-UCP-PADMPME-215945- CS-QCBS / Recrutement d'un Component 1: Support Cabinet chargé de la mise en entrepreneurship Quality And Cost- IDA / 62870 Prior Open - International 1,000,000.00 0.00 Canceled 2021-03-15 2021-04-05 2021-05-19 2021-06-16 2021-07-16 2021-08-20 2021-09-24 2022-09-24 œuvre des réformes opportunities for youth and Based Selection prioritaires sur le cadre women juridique des PME identifiées INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-UCP-PADMPME-147454- CS-INDV / Recrutement d'un Component 3: Capacity Individual Consultant individuel chargé Pending IDA / 62870 building and Project Post Consultant Open 50,000.00 0.00 2019-12-05 2020-01-23 2020-02-13 2020-03-19 2020-09-15 d'élaborer le manuel de Implementation Management Selection gestion des subventions et gestion des sous projets ZR-UCP-PADMPME-147461- Component 3: Capacity Individual CS-INDV / Recrutement d'un IDA / 62870 building and Project Post Consultant Open 48,000.00 48,000.00 Signed 2019-12-04 2019-12-17 2020-01-22 2020-05-21 2020-02-12 2020-06-10 2020-03-18 2020-11-02 2020-09-14 Expert Juriste pour le projet Management Selection PADMPME ZR-UCP-PADMPME-147464- CS-INDV / Recrutement d'un Component 3: Capacity Individual chargé de passation des IDA / 62870 building and Project Post Consultant Limited 36,000.00 48,000.00 Signed 2019-12-06 2019-12-17 2019-12-11 2020-01-21 2020-01-01 2020-02-12 2020-02-05 2020-03-02 2020-08-03 marchés pour le projet Management Selection PADMPME ZR-UCP-PADMPME-147466- Component 3: Capacity Individual CS-INDV / Recrutement d'un IDA / 62870 building and Project Post Consultant Limited 30,000.00 30,000.00 Signed 2019-12-09 2019-12-17 2019-12-14 2019-12-30 2020-01-04 2020-03-09 2020-02-08 2020-03-18 2020-08-06 trésorier pour le projet Management Selection PADMPME ZR-UCP-PADMPME-147468- Component 3: Capacity Individual CS-INDV / Recrutement d'un IDA / 62870 building and Project Post Consultant Limited 21,600.00 24,000.00 Signed 2019-12-10 2019-12-17 2019-12-15 2020-09-14 2020-01-05 2020-10-28 2020-02-09 2020-11-05 2020-08-07 Logisticien pour le projet Management Selection PADMPME ZR-UCP-PADMPME-147473- CS-INDV / Recrutement Component 3: Capacity Individual d'unchauffeur du IDA / 62870 building and Project Post Consultant Limited 10,800.00 9,600.00 Signed 2019-12-12 2019-12-17 2019-12-17 2020-01-22 2020-01-07 2020-01-31 2020-02-11 2020-02-03 2020-08-09 Coordonnateur du projet Management Selection PADMPME ZR-UCP-PADMPME-147930- CS-INDV / Recrutement d'un Point Focal PADMPME auprès Component 3: Capacity Individual du Ministères de la classe IDA / 62870 building and Project Post Consultant Limited 24,000.00 24,000.00 Signed 2019-12-04 2019-12-05 2019-12-09 2019-12-11 2019-12-30 2020-02-25 2020-02-03 2020-02-26 2020-08-01 moyennes petites et Management Selection moyennes entreprises et artisanat. ZR-UCP-PADMPME-147432- CS-CDS / Recrutement des Consultants GAUDREAULT Francis et HART POLIQUIN Component 3: Capacity Noira pour assistance IDA / 62870 building and Project Prior Direct Selection Direct 451,935.00 351,732.00 Signed 2019-12-05 2019-12-09 2019-12-15 2019-12-10 2020-02-18 2020-03-02 2020-08-16 technique et renforcement Management des capacités de l'UCP PADMPME en Leadership axé sur les résultats et en approche à résultats rapides ZR-UCP-PADMPME-147429- CS-CDS / Recrutement du Component 1: Support Cabinet Vélior entrepreneurship IDA / 62870 Post Direct Selection Direct 167,240.00 164,734.00 Signed 2019-12-03 2019-12-06 2019-12-13 2020-03-10 2020-02-16 2020-04-23 2020-08-14 Développement pour une opportunities for youth and assistance technique à l'UCP women PADMPME ZR-UCP-PADMPME-147474- Component 3: Capacity Individual CS-INDV / Description d'un IDA / 62870 building and Project Post Consultant Limited 10,800.00 0.00 Canceled 2019-12-06 2019-12-17 2019-12-11 2020-01-01 2020-02-05 2020-08-03 Planton pour le projet Management Selection PADMPME ZR-UCP-PADMPME-153440- CS-CDS / Recrutement d'un Component 3: Capacity éditeur chargé de la relecture IDA / 62870 building and Project Post Direct Selection Direct 1,000.00 1,000.00 Signed 2020-01-10 2020-01-20 2020-01-20 2020-01-21 2020-03-25 2020-01-27 2020-09-21 du rapport sur l'écosystème Management des petites et moyennes entreprises en RDC ZR-UCP-PADMPME-159674- CS-CDS / Contractualisation Component 1: Support avec ONU femmes chargé de entrepreneurship IDA / 62870 Prior Direct Selection Direct 1,000,000.00 6,513,602.00 Signed 2020-02-18 2020-03-31 2020-02-28 2020-04-06 2020-05-03 2021-03-11 2020-10-30 la réforme et la dissémination opportunities for youth and des textes de lois en faveur women des femmes Page 4 ZR-UCP-PADMPME-144391- CS-INDV / Recrutement d'un Consultant individuel chargé Component 3: Capacity Individual de la Cartographie de services IDA / 62870 building and Project Post Consultant Open 25,000.00 27,710.00 Signed 2019-11-22 2019-12-18 2020-01-10 2020-05-11 2020-01-31 2020-05-29 2020-03-06 2020-06-03 2020-09-02 pour les survivantes des Management Selection violences basées sur le genre dans les villes de Matadi et Lubumbashi ZR-UCP-PADMPME-147470- Component 3: Capacity Individual CS-INDV / Recrutement d'un IDA / 62870 building and Project Post Consultant Limited 15,600.00 0.00 Canceled 2019-12-11 2019-12-17 2019-12-16 2020-01-06 2020-02-10 2020-08-08 Secrétaire financier pour le Management Selection projet PADMPME ZR-UCP-PADMPME-164529- CS-INDV / Recrutement Component 3: Capacity Individual d'Assistant administratif et IDA / 62870 building and Project Post Consultant Limited 12,000.00 18,000.00 Signed 2020-04-30 2020-07-07 2020-05-05 2020-07-14 2020-05-26 2020-08-04 2020-06-30 2020-08-10 2020-12-27 financier pour l'antenne Management Selection provinciale du PADMPME à Goma ZR-UCP-PADMPME-164531- CS-INDV / Recrutement d'un Component 3: Capacity Individual Assistant administratif et Under IDA / 62870 building and Project Post Consultant Limited 12,000.00 0.00 2020-03-31 2020-07-07 2020-04-05 2020-09-17 2020-04-26 2021-04-02 2020-05-31 2020-11-27 financier pour l'antenne Implementation Management Selection provinciale du PADMPME Lubumbashi ZR-UCP-PADMPME-164533- CS-INDV / Recrutement d'un Component 3: Capacity Individual Assistant administratif et IDA / 62870 building and Project Post Consultant Limited 12,000.00 12,000.00 Signed 2020-03-31 2020-07-07 2020-04-05 2020-09-04 2020-04-26 2020-11-16 2020-05-31 2020-11-23 2020-11-27 financier pour l'antenne Management Selection provinciale du PADMPME Matadi ZR-UCP-PADMPME-164535- CS-INDV / Recrutement d'un Component 3: Capacity Individual Chauffeur pour l'antenne IDA / 62870 building and Project Post Consultant Limited 8,400.00 7,200.00 Signed 2020-03-31 2020-07-07 2020-04-05 2020-09-10 2020-04-26 2020-10-27 2020-05-31 2020-11-12 2020-11-27 provinciale du PADMPME Management Selection Goma ZR-UCP-PADMPME-164536- CS-INDV / Recrutement d'un Component 3: Capacity Individual chauffeur pour l'antenne IDA / 62870 building and Project Post Consultant Limited 8,400.00 7,200.00 Signed 2020-03-31 2020-07-07 2020-04-05 2020-09-24 2020-04-26 2020-10-27 2020-05-31 2020-10-29 2020-11-27 provinciale du PADMPME Management Selection Lubumbashi ZR-UCP-PADMPME-164537- CS-INDV / Recrutement d'un Component 3: Capacity Individual Chauffeur pour l'antenne IDA / 62870 building and Project Post Consultant Limited 8,400.00 10,036.00 Terminated 2020-03-31 2020-07-07 2020-04-05 2020-09-04 2020-04-26 2020-11-16 2020-05-31 2020-11-24 2020-11-27 provinciale du PADMPME Management Selection Matadi ZR-UCP-PADMPME-147226- Component 1: Support CS-CDS / Recrutement du entrepreneurship IDA / 62870 Post Direct Selection Direct 300,000.00 0.00 Canceled 2019-12-05 2020-01-10 2019-12-15 2020-02-18 2020-08-16 Cabinet MOVES chargé de la opportunities for youth and formation STEP women ZR-UCP-PADMPME-163881- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Jean-Luc MUALU IDA / 62870 building and Project Post Consultant Direct 48,000.00 24,000.00 Signed 2020-04-28 2020-12-04 2020-05-08 2021-02-11 2020-05-29 2020-04-16 2020-07-03 2020-04-20 2020-12-30 en qualité d'Expert en Management Selection Communication du PADMPME ZR-UCP-PADMPME-163477- CS-CDS / Contractualisation Component 1: Support avec le Cabinet MOVES entrepreneurship chargée de la mise en oeuvre IDA / 62870 Prior Direct Selection Direct 600,000.00 591,600.00 Signed 2020-04-29 2020-04-23 2020-05-09 2020-04-24 2020-07-13 2020-08-21 2021-01-09 opportunities for youth and de la formation en Initiative women personnelle et de la formation STEP ZR-UCP-PADMPME-158734- CS-CDS / Renouvellement du Component 3: Capacity contrat de Raphael KAKUDJI IDA / 62870 building and Project Post Direct Selection Direct 48,000.00 48,000.00 Signed 2020-04-28 2020-12-04 2020-05-08 2020-01-28 2020-07-12 2020-01-29 2021-01-08 MANDE en qualité d'Expert en Management suivi & évaluation ZR-UCP-PADMPME-158737- CS-CDS / Renouvellement du Component 3: Capacity contrat de Benjamin IDA / 62870 building and Project Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-04-28 2020-12-04 2020-05-08 2020-01-28 2020-07-12 2020-01-29 2021-01-08 TSHIENDA wa MBANGU en Management qualité de Comptable ZR-UCP-PADMPME-158730- Component 3: Capacity CS-CDS / Renouvellement du IDA / 62870 building and Project Post Direct Selection Direct 54,000.00 54,000.00 Signed 2020-04-28 2020-12-04 2020-05-08 2020-01-28 2020-07-12 2020-01-29 2021-01-08 contrat de Kevinn NDONJI en Management qualité d'Auditeur interne ZR-UCP-PADMPME-158735- CS-CDS / Renouvellement du Component 3: Capacity contrat de Roger IDA / 62870 building and Project Post Direct Selection Direct 48,000.00 48,000.00 Signed 2020-04-28 2020-12-04 2020-05-08 2020-01-28 2020-07-12 2020-01-29 2021-01-08 BOKANDENGA GBAMO en Management qualité d'Expert en sauvegarde environnementale et sociale ZR-UCP-PADMPME-158718- CS-CDS / Renouvellement du Component 3: Capacity Contrat de Meilleur BASEMA IDA / 62870 building and Project Post Direct Selection Direct 54,000.00 54,000.00 Signed 2020-04-28 2020-11-04 2020-05-08 2020-01-28 2020-07-12 2020-01-29 2021-01-08 KOMANDA en qualité de Management Responsable Administratif et Finacier ZR-UCP-PADMPME-179017- CS-CDS / Contractualisation avec Kivu Entrepreneur Component 1: Support comme consultant chargé de entrepreneurship IDA / 62870 Post Direct Selection Direct 70,000.00 76,700.00 Signed 2020-06-15 2020-06-26 2020-06-25 2020-07-13 2020-08-29 2020-08-10 2021-02-25 l'identification des femmes opportunities for youth and entrepreneurs devant women participer à la formation en initiative personnelle Page 5 ZR-UCP-PADMPME-185723- CS-INDV / Recrutement d'un Component 3: Capacity Individual Consultant individuel Chargé IDA / 62870 building and Project Post Consultant Limited 10,000.00 8,885.00 Signed 2020-08-10 2020-08-06 2020-08-15 2020-07-27 2020-09-05 2020-08-20 2020-10-10 2020-08-26 2021-04-08 de la traduction des Management Selection documents du projet PADMPME ZR-UCP-PADMPME-185725- CS-INDV / Recrutement d'un Component 3: Capacity Individual Assistant Comptable en IDA / 62870 building and Project Post Consultant Limited 30,000.00 36,000.00 Signed 2020-08-12 2020-11-12 2020-08-17 2020-11-06 2020-09-07 2021-01-05 2020-10-12 2021-02-17 2021-04-10 charge des Partenaires Management Selection d'exécution des projets au sein de l'UCP ZR-UCP-PADMPME-185915- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de MUKADI TSHIELA IDA / 62870 building and Project Post Consultant Direct 24,000.00 24,000.00 Signed 2020-08-10 2020-12-04 2020-08-20 2020-06-11 2020-09-10 2020-06-15 2020-10-15 2020-07-01 2021-04-13 Gloria en qualité d'Assistante Management Selection en Passation des marchés du PADMPME ZR-UCP-PADMPME-185914- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de MULEMBA IDA / 62870 building and Project Post Consultant Direct 10,800.00 10,800.00 Signed 2020-08-10 2020-12-04 2020-08-20 2020-06-04 2020-09-10 2020-06-26 2020-10-15 2020-07-01 2021-04-13 MANIONGA Syntiche en Management Selection qulaité de réceptionniste du PADMPME ZR-UCP-PADMPME-185913- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de NSIMBA MABUMBA IDA / 62870 building and Project Post Consultant Direct 48,000.00 48,000.00 Signed 2020-08-10 2020-12-04 2020-08-20 2020-07-07 2020-09-10 2020-07-08 2020-10-15 2020-07-09 2021-04-13 Chantal en qualité d'Experte Management Selection en Genre et Inclusion Sociale ZR-UCP-PADMPME-188716- CS-INDV / Renouvellement du Component 3: Capacity Individual Under contrat de Carmy KODIA IDA / 62870 building and Project Post Consultant Direct 18,000.00 0.00 2020-10-19 2020-12-02 2020-10-29 2020-11-19 2020-12-24 2021-06-22 Implementation MASSAMBA en qualité l'IT Management Selection Officer ZR-UCP-PADMPME-185912- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Eddy ISEKAMA IDA / 62870 building and Project Post Consultant Direct 54,000.00 54,000.00 Signed 2020-10-19 2020-12-02 2020-10-29 2020-01-28 2020-11-19 2020-01-28 2020-12-24 2020-01-27 2021-06-22 BOTULU en qualité de Management Selection Spécialiste en Passation des marchés ZR-UCP-PADMPME-199246- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Monsieur Gilbert IDA / 62870 building and Project Post Consultant Direct 9,600.00 9,600.00 Signed 2020-10-13 2020-12-04 2020-10-23 2020-08-13 2020-11-13 2020-08-17 2020-12-18 2020-09-09 2021-06-16 MUR’A-NSENG-NGAL en Management Selection qualité de Chauffeur Coursier au PADMPME ZR-UCP-PADMPME-167498- CS-INDV-REV / Recrutement Component 3: Capacity Individual d'un Point focal provincial du IDA / 62870 building and Project Post Consultant Open 48,000.00 48,000.00 Signed 2020-04-30 2019-12-09 2020-06-18 2020-06-23 2020-07-09 2020-07-14 2020-08-13 2020-08-03 2021-02-09 projet pour la ville de Management Selection Lubumbashi ZR-UCP-PADMPME-167498- CS-INDV / Recrutement d'un Component 3: Capacity Individual Point focal provincial du IDA / 62870 building and Project Prior Consultant Open 48,000.00 0.00 Canceled 2020-04-30 2020-06-18 2020-07-09 2020-08-13 2021-02-09 projet pour la ville de Management Selection Lubumbashi ZR-UCP-PADMPME-200887- CS-INDV / Recrutement d'un Consultant individuel chargé d'accompagner le Component 1: Support Individual gouvernement de la RDC dans entrepreneurship IDA / 62870 Post Consultant Open 35,000.00 24,140.00 Signed 2020-11-23 2020-11-13 2021-01-11 2021-02-24 2021-02-01 2021-03-04 2021-03-08 2021-03-17 2021-09-04 l'élaboration d'avant projet de opportunities for youth and Selection loi (texte initial) sur le cadre women institutionnel des micro, petites et moyennes entreprises ZR-UCP-PADMPME-200604- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Monsieur Pierre IDA / 62870 building and Project Post Consultant Direct 48,000.00 48,000.00 Signed 2020-10-20 2020-12-04 2020-10-30 2020-09-23 2020-11-20 2020-09-23 2020-12-25 2020-10-01 2021-06-23 MBAMBI Chef d'Antenne de la Management Selection ville de Matadi ZR-UCP-PADMPME-200608- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Madame Esther IDA / 62870 building and Project Post Consultant Direct 48,000.00 48,000.00 Signed 2020-11-20 2020-12-04 2020-11-30 2020-09-24 2020-12-21 2020-09-24 2021-01-25 2020-10-01 2021-07-24 KALANGA, en qualité de Chef Management Selection d'Antenne pour la ville de Goma ZR-UCP-PADMPME-204705- CS-INDV / Renouvellement du contrat de Mr MUBIALA BALUB- Component 3: Capacity Individual IMBAND Odon-Charles en IDA / 62870 building and Project Post Consultant Direct 24,000.00 24,000.00 Signed 2020-11-13 2020-12-04 2020-11-23 2020-08-28 2020-12-14 2020-08-31 2021-01-18 2020-09-02 2021-07-17 qualité de Spécialiste en Management Selection Petites et Moyennes Entreprises ZR-UCP-PADMPME-204749- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Mr MUALU Jean- IDA / 62870 building and Project Post Consultant Direct 48,000.00 48,000.00 Signed 2020-11-13 2020-12-04 2020-11-23 2020-10-28 2020-12-14 2020-10-28 2021-01-18 2020-10-29 2021-07-17 Luc en qualité de Spécialiste Management Selection en Communication ZR-UCP-PADMPME-205587- CS-CDS / Contractualisation Component 1: Support avec Monsieur Aimé ZONVENI entrepreneurship Under BE LEMBE Consultant IDA / 62870 Post Direct Selection Direct 15,000.00 0.00 2020-11-30 2021-02-15 2020-12-10 2021-02-13 2021-08-12 opportunities for youth and Implementation individuel chargé de traduire women en français le contrat à signer avec l'agence ONU femmes Page 6 ZR-UCP-PADMPME-205585- CS-CDS / Contractualisation avec la firme Kivu Component 1: Support Entrepreneur pour entrepreneurship Under l'enregistrement des femmes IDA / 62870 Post Direct Selection Direct 70,000.00 0.00 2020-11-30 2021-02-04 2020-12-10 2021-04-06 2021-02-13 2021-08-12 opportunities for youth and Implementation devant participer à la women formation en initiative personnelle (FIP) dans les villes de Kinshasa et Matadi ZR-UCP-PADMPME-208790- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Elise MBUYU IDA / 62870 building and Project Post Consultant Direct 24,000.00 24,000.00 Signed 2020-12-09 2021-02-17 2020-12-19 2020-12-14 2021-01-09 2020-12-15 2021-02-13 2020-12-23 2021-08-12 MBAYO en qualité de Management Selection secrétaire administratif du PADMPME ZR-UCP-PADMPME-208791- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Mimie EYIMA Under IDA / 62870 building and Project Post Consultant Direct 42,000.00 42,000.00 2020-12-09 2021-02-15 2020-12-19 2020-12-14 2021-01-09 2020-12-15 2021-02-13 2021-08-12 MODJAKA en sa qualité de Implementation Management Selection l'Assistante au Coordonnateur National du PADMPME ZR-UCP-PADMPME-216305- Component 3: Capacity Individual CS-INDV / Recrutement d'un IDA / 62870 building and Project Post Consultant Limited 8,400.00 7,200.00 Signed 2021-01-27 2021-02-15 2021-02-01 2021-03-22 2021-02-22 2021-04-16 2021-03-29 2021-04-19 2021-09-25 chauffeur coursier pour Management Selection l'antenne de Matadi ZR-UCP-PADMPME-216364- Component 3: Capacity Individual CS-INDV / Recrutement d'un Under IDA / 62870 building and Project Post Consultant Limited 9,600.00 0.00 2021-01-27 2021-02-16 2021-02-01 2021-03-30 2021-02-22 2021-03-29 2021-09-25 Chauffeur de la Coordinnation Implementation Management Selection pour le projet PADMPME ZR-UCP-PADMPME-150611- CS-CDS / Contractualisation avec le Cabinet CARAPACES Component 1: Support pour la phase 2 de la mission entrepreneurship IDA / 62870 Prior Direct Selection Direct 500,000.00 0.00 Canceled 2020-02-05 2020-02-14 2020-02-15 2020-03-06 2020-04-20 2020-10-17 portant sur l'accompagnement opportunities for youth and à la mise en oeuvre des women réformes du cadre juridique des PME ZR-UCP-PADMPME-215822- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Mr TSHIENDA IDA / 62870 building and Project Post Consultant Direct 37,800.00 37,800.00 Signed 2021-01-25 2021-03-19 2021-02-04 2021-01-22 2021-02-25 2021-01-28 2021-04-01 2021-01-28 2021-09-28 Benjamin en sa qualité de Management Selection Comptable du PADMPME ZR-UCP-PADMPME-215720- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Mr KAKUDJI IDA / 62870 building and Project Post Consultant Direct 50,400.00 50,400.00 Signed 2021-01-25 2021-03-19 2021-02-04 2021-01-22 2021-02-25 2021-01-28 2021-04-01 2021-01-29 2021-09-28 Raphaël en sa qualité de Management Selection Spécialiste en Suivi et Evaluation ZR-UCP-PADMPME-215809- CS-INDV / Renouvellement du contrat de Mr Component 3: Capacity Individual BOKANDENGA Roger en sa IDA / 62870 building and Project Post Consultant Direct 50,400.00 48,000.00 Signed 2021-01-25 2021-03-19 2021-02-04 2021-01-22 2021-02-25 2020-01-28 2021-04-01 2021-01-28 2021-09-28 qualité de Spécialiste en Management Selection Sauvegarde Environnementale et Sociale ZR-UCP-PADMPME-215812- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Mr NDONJI Kevin IDA / 62870 building and Project Post Consultant Direct 56,760.00 56,760.00 Signed 2021-01-25 2021-03-19 2021-02-04 2021-01-22 2021-02-25 2021-01-28 2021-04-01 2021-01-28 2021-09-28 en sa qualité d'Auditeur Management Selection Interne du PADMPME ZR-UCP-PADMPME-215820- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Mr BASEMA IDA / 62870 building and Project Post Consultant Direct 56,760.00 56,760.00 Signed 2021-01-25 2021-03-19 2021-02-04 2021-01-22 2021-02-25 2021-01-28 2021-04-01 2021-01-28 2021-09-28 Meilleur du Responsable Management Selection Administratif et financier du PADMPME ZR-UCP-PADMPME-218524- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat du Chauffeur du IDA / 62870 building and Project Post Consultant Direct 9,600.00 9,600.00 Signed 2021-02-09 2021-03-19 2021-02-19 2021-01-29 2021-03-12 2021-02-01 2021-04-16 2021-02-03 2021-10-13 Coordonnateur de l'UCP- Management Selection PADMPME ZR-UCP-PADMPME-164525- Component 3: Capacity Individual CS-INDV / Recrutement d'un IDA / 62870 building and Project Post Consultant Limited 12,000.00 0.00 Canceled 2020-04-30 2020-05-05 2020-05-26 2020-06-30 2020-12-27 Assistant administratif et Management Selection financier pour l'UCP PADMPME ZR-UCP-PADMPME-216293- CS-INDV / Recrutement d'un Component 3: Capacity Individual Consultant individuel IDA / 62870 building and Project Post Consultant Direct 54,000.00 0.00 Canceled 2021-02-22 2021-03-04 2021-03-25 2021-04-29 2021-10-26 Spécialiste en Passation des Management Selection marchés pour le compte du PADMPME ZR-UCP-PADMPME-226471- CS-INDV / Renouvellement du Component 3: Capacity Individual contrat de Mr Odon-Charles IDA / 62870 building and Project Post Consultant Direct 48,000.00 48,000.00 Signed 2021-03-25 2021-04-02 2021-04-04 2021-02-26 2021-04-25 2021-02-26 2021-05-30 2021-03-01 2021-11-26 MUBIALA en sa qualité de Management Selection Spécialiste en Petites et Moyennes Entreprises ZR-UCP-PADMPME-226478- Component 3: Capacity Individual CS-INDV / Renouvellement du IDA / 62870 building and Project Post Consultant Direct 30,000.00 30,000.00 Signed 2021-03-25 2021-04-02 2021-04-04 2021-03-11 2021-04-25 2021-03-16 2021-05-30 2021-03-15 2021-11-26 contrat de Mr Venance N'SAKA Management Selection en sa qualité de Trésorier ZR-UCP-PADMPME-226489- CS-INDV / Renouvellemet du Component 3: Capacity Individual Under contrat de Mr Alexis IDA / 62870 building and Project Post Consultant Direct 274,750.00 0.00 2021-03-25 2021-04-02 2021-04-04 2021-02-09 2021-04-25 2021-05-30 2021-11-26 Implementation MANGALA en qualité de Management Selection Coordonnateur National du Page 7 ZR-UCP-PADMPME-226467- CS-CDS / Recrutement de Component 3: Capacity Pending Thomas TSHIMANGA en IDA / 62870 building and Project Post Direct Selection Direct 54,000.00 0.00 2021-03-30 2021-04-09 2021-06-13 2021-12-10 Implementation qualité de Spécialiste en Management Passation des marchés ZR-UCP-PADMPME-226579- CS-INDV / Recrutement d’un consultant individuel chargé de l’identification des Component 3: Capacity Individual réformes à réaliser dans les IDA / 62870 building and Project Post Consultant Open 60,000.00 0.00 Canceled 2021-04-15 2021-06-03 2021-06-24 2021-07-29 2022-01-25 zones du projet en vue de la Management Selection mise sur pied d’un cadre juridique attractif pour les micro, petites et moyennes entreprises ZR-UCP-PADMPME-229688- CS-CDS / Contractualisation Component 1: Support avec Mme Claudine entrepreneurship Pending NSHOKANO BALEZI comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Goma ZR-UCP-PADMPME-229693- CS-CDS / Contractualisation Component 1: Support avec Mme Eudoxie NZIAVAKE entrepreneurship Pending SAANANE comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229694- CS-CDS / Contractualisation avec Mr Prosper KALOMBWE Component 1: Support MWENELUPANGO Claudine entrepreneurship Pending IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 NSHOKANO BALEZI comme opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Goma ZR-UCP-PADMPME-229695- CS-CDS / Contractualisation Component 1: Support avec Mr Robert KITSA BASHALI entrepreneurship Pending IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 comme formateur dans le opportunities for youth and Implementation cadre de la formation à women l’initiative personnelle à Goma ZR-UCP-PADMPME-229696- CS-CDS / Contractualisation Component 1: Support avec Mme Lauren MUNTU entrepreneurship Pending KUNTADI comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229697- CS-CDS / Contractualisation Component 1: Support avec Mme Lucie-Ornella entrepreneurship Pending SOSOLE KAHONGYA comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Goma ZR-UCP-PADMPME-229698- CS-CDS / Contractualisation Component 1: Support avec Mr Donat MAMBO entrepreneurship Pending MWENELWATA comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Goma ZR-UCP-PADMPME-229699- CS-CDS / Contractualisation Component 1: Support avec Mme Linda MASIKA entrepreneurship Pending KYAKIMWA comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229700- CS-CDS / Contractualisation Component 1: Support avec Mme Nelly MBANGU entrepreneurship Pending MADIEKA comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229701- CS-CDS / Contractualisation Component 1: Support avec Mr Jonathan MUHINDO entrepreneurship Pending ITENGERO comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229702- CS-CDS / Contractualisation Component 1: Support avec Mme Sophie SAFI MAMBO entrepreneurship Pending IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 comme formateur dans le opportunities for youth and Implementation cadre de la formation à women l’initiative personnelle à Goma ZR-UCP-PADMPME-229704- CS-CDS / Contractualisation Component 1: Support avec Mr Ayanza PALUKU entrepreneurship Pending TUTWAVUNOKA comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Goma Page 8 ZR-UCP-PADMPME-229705- CS-CDS / Contractualisation Component 1: Support avec Mr François KAZADI entrepreneurship Pending TSHINEMU comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229707- CS-CDS / Contractualisation Component 1: Support avec Mr Glody WENGA entrepreneurship Pending BANYAWA comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229708- CS-CDS / Contractualisation Component 1: Support avec Mme Maguy-Rachel entrepreneurship Pending IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 YULA DJEMA comme opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Goma ZR-UCP-PADMPME-229709- CS-CDS / Contractualisation Component 1: Support avec Mme Valérie NABULA entrepreneurship Pending WASSO comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229710- CS-CDS / Contractualisation Component 1: Support avec Mr Consolation WETSHI entrepreneurship Pending TAMBO comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229711- CS-CDS / Contractualisation Component 1: Support avec Mme Thérèse AMANI entrepreneurship Pending KITENGE comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229712- CS-CDS / Contractualisation Component 1: Support avec Mme Agnès KABWIZ A entrepreneurship Pending KABEY MUYAMBO comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229713- CS-CDS / Contractualisation Component 1: Support avec Mme Aimée MANYONG entrepreneurship Pending MUYUMB comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229714- CS-CDS / Contractualisation Component 1: Support avec Mme Angèle NSILULU entrepreneurship Pending NGUILU comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229715- CS-CDS / Contractualisation Component 1: Support avec Mr Jean-Guelord BINEMO entrepreneurship Pending SHASIMIADI comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229716- CS-CDS / Contractualisation Component 1: Support avec Mr Cédrick MAYUKA entrepreneurship Pending KINENKINDA comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229717- CS-CDS / Contractualisation Component 1: Support avec Mr David CHALWE entrepreneurship Pending comme formateur dans le IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation cadre de la formation à women l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229718- CS-CDS / Contractualisation Component 1: Support avec Mr Ingrid-Nathan entrepreneurship Pending KIMENGA LUZAMBO comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229719- CS-CDS / Contractualisation Component 1: Support avec Mr Jean-Jacques KALONJI entrepreneurship Pending comme formateur dans le IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation cadre de la formation à women l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229720- CS-CDS / Contractualisation Component 1: Support avec Mme KYONA MUKEINA entrepreneurship Pending comme formateur dans le IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation cadre de la formation à women l’initiative personnelle à Lubumbashi Page 9 ZR-UCP-PADMPME-229721- CS-CDS / Contractualisation Component 1: Support avec Mr Lucien TSHINUISHI entrepreneurship Pending KALONDA comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229722- CS-CDS / Contractualisation Component 1: Support avec Mr Gaël MBALA entrepreneurship Pending KANGULUNGU comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229723- CS-CDS / Contractualisation Component 1: Support avec Mme Véronique entrepreneurship Pending MWAMBA KABASHA comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229724- CS-CDS / Contractualisation Component 1: Support avec Mr Paul MUMBA entrepreneurship Pending SHIWAMYA KAISA comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229725- CS-CDS / Contractualisation Component 1: Support avec Mr Guillaume SANGWA entrepreneurship Pending YAMBAMBA comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229728- CS-CDS / Contractualisation Component 1: Support avec Mr KAKEL MBUMB entrepreneurship Pending comme formateur dans le IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation cadre de la formation à women l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-229730- CS-INDV / Recrutement d’un consultant individuel chargé Component 1: Support Individual de la promotion et de la mise entrepreneurship IDA / 62870 Post Consultant Open 75,000.00 0.00 Under Review 2021-05-10 2021-06-28 2021-07-19 2021-08-23 2022-02-19 en place de plateformes opportunities for youth and Selection provinciales du dialogue women public prive dans les zones du projet. ZR-UCP-PADMPME-229970- CS-CDS / Contractualisation Component 1: Support avec Mme Marceline KAVIRA entrepreneurship Pending MAGHULU YEYE comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-05-24 2021-07-28 2022-01-24 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Goma ZR-UCP-PADMPME-229974- CS-CDS / Contractualisation Component 1: Support avec Mr Patrick ABEDI entrepreneurship Pending MAPASSA comme formateur IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-06-05 2021-08-09 2022-02-05 opportunities for youth and Implementation dans le cadre de la formation women à l’initiative personnelle à Goma ZR-UCP-PADMPME-229981- CS-CDS / Contractualisation Component 1: Support avec Mr Albert KALONJI entrepreneurship Pending MBWENGELA comme IDA / 62870 Post Direct Selection Direct 2,700.00 0.00 2021-05-14 2021-06-05 2021-08-09 2022-02-05 opportunities for youth and Implementation formateur dans le cadre de la women formation à l’initiative personnelle à Lubumbashi ZR-UCP-PADMPME-226604- CS-INDV / Recrutement d’un Consultant individuel chargé Individual de la réalisation de Screening Component 2. SME IDA / 62870 Post Consultant Limited 60,000.00 0.00 Canceled 2021-04-12 2021-03-30 2021-04-17 2021-05-08 2021-06-12 2021-12-09 environnemental et social Development Selection dans des Centres des PME à Goma, Lubumbashi, Matadi et Kinshasa. Page 10 PROCUREMENT PLAN Project information: Belarus, Education Modernization Project, 8529-BY, 8943 - ВY Project Implementation agency: National Institute of Education Date of the Procurement Plan: January 2020 Period covered by this Procurement Plan: January 2020 – July 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods is not applicable Works is not applicable Other Relevant Procurement Information. Not Applicable PROCUREMENT Belarus : Belarus Education Modernization Project PLAN General Information Country: Belarus Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P148181 GPN Date: 2019-11-25 Project Name: Belarus Education Modernization Project Loan / Credit No: IBRD / 85290, IBRD / 89430 National Institute of Education Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Amount Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/NCB/1.1/2-16-2 / RECONSTRUCTION AND Ensuring a quality learning CAPITAL REPAIRS OF GENERAL environment in schools Single Stage - One 1,150,466.2 2016-07- 2016-08- IBRD / 85290 Prior Request for Bids Open - National Signed SECONDARY EDUCATION receiving students from Envelope 9 13 09 (GSE) FACILITIES IN VITEBSK closed/reorganized schools OBLAST 2016 BEMP/NCB/1.1/5-16/1 / RECONSTRUCTION AND Ensuring a quality learning CAPITAL REPAIRS OF GENERAL environment in schools Single Stage - One 2016-07- 2016-08- IBRD / 85290 Prior Request for Bids Open - National 211,298.16 Signed SECONDARY EDUCATION receiving students from Envelope 13 29 (GSE) FACILITIES IN MINSK closed/reorganized schools OBLAST 2016 BEMP/NCB/1.1/3-16-3 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2016-04- 2020-01- 2020-02- 2016-06- 2020-03- 2016-08- 2020-04- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 0.00 Canceled Envelope 04 29 09 20 06 21 03 25 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 BEMP/NCB/1.1/22/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-01- 2020-01- 2020-02- 2018-03- 2020-03- 2018-04- 2020-04- 2018-05- 2020-10- repairs of general secondary IBRD / 89430 management in general Post Request for Bids Open - National 414,066.16 Signed Envelope 04 19 09 20 06 21 04 25 03 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 (4 lot) BEMP/NCB/1.1/41 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-02- 2020-01- 2020-02- 2019-03- 2020-03- 2019-04- 2020-04- 2019-06- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 371,156.53 Signed Envelope 04 01 09 20 26 21 30 25 06 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 (2 lots) BEMP/NCB/1.1/41/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-07- 2020-01- 2020-02- 2019-08- 2020-03- 2019-10- 2020-04- 2019-11- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 161,491.47 Signed Envelope 04 17 09 20 30 21 10 25 18 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 (3 lots) BEMP/NCB/1.1/20/3 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-12- 2020-01- 2020-02- 2019-01- 2020-03- 2019-02- 2020-04- 2019-03- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 92,213.54 Signed Envelope 08 22 13 24 23 25 06 29 06 26 education (GSE) facilities in secondary education Brest Oblast – 2017 (2 lots) BEMP/NCB/1.1/25 / Reconstruction and capital Modernization of system Single Stage - One 1,041,029.9 2020-01- 2018-06- 2020-01- 2020-02- 2018-08- 2020-03- 2018-10- 2020-04- 2018-12- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National Signed Envelope 0 08 21 13 24 28 25 18 29 29 26 education (GSE) facilities in secondary education Mogilev Oblast – 2017 (1 lots) BEMP/NCB/1.1/25/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-12- 2020-01- 2020-02- 2019-02- 2020-03- 2019-05- 2020-04- 2019-06- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 945,069.39 Signed Envelope 08 03 13 24 20 25 13 29 13 26 education (GSE) facilities in secondary education Mogilev Oblast – 2017 (2 lots) BEMP/NCB/1.1/25/2 / Reconstruction and capital Modernization of system Single Stage - One 1,672,651.4 2020-01- 2019-03- 2020-01- 2020-02- 2019-04- 2020-03- 2019-06- 2020-04- 2019-08- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National Signed Envelope 3 08 04 13 24 10 25 28 29 21 26 education (GSE) facilities in secondary education Mogilev Oblast – 2017 (2 lots) BEMP/NCB/1.1/42 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-04- 2020-01- 2020-02- 2019-05- 2020-03- 2019-07- 2020-04- 2019-08- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 318,725.48 Signed Envelope 08 10 13 24 22 25 08 29 07 26 education (GSE) facilities in secondary education Minsk Oblast – 2018 (1 lot) BEMP/NCB/1.1/23 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2017-04- 2020-01- 2020-02- 2017-05- 2020-03- 2017-06- 2020-04- 2017-06- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 470,197.00 Signed Envelope 08 13 13 24 12 25 08 29 16 26 education (GSE) facilities in secondary education Grodno Oblast – 2017 (1 lot) BEMP/NCB/1.1/23/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-06- 2020-01- 2020-02- 2018-07- 2020-03- 2018-08- 2020-04- 2018-09- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 799,159.39 Signed Envelope 09 28 14 25 18 26 22 30 20 27 education (GSE) facilities in secondary education Grodno Oblast – 2017 (2 lots) BEMP/NCB/1.1/23/3 / Reconstruction and capital Modernization of system Single Stage - One 1,690,540.4 2020-01- 2018-12- 2020-01- 2020-02- 2019-01- 2020-03- 2019-03- 2020-04- 2019-04- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National Signed Envelope 3 09 14 14 25 17 26 26 30 26 27 education (GSE) facilities in secondary education Grodno Oblast – 2017 (1 lot) BEMP/NCB/1.1/23/2 / Reconstruction and capital Modernization of system Single Stage - One 2,134,116.3 2020-01- 2018-10- 2020-01- 2020-02- 2018-11- 2020-03- 2018-11- 2020-04- 2018-12- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National Signed Envelope 5 09 09 14 25 13 26 16 30 19 27 education (GSE) facilities in secondary education Grodno Oblast – 2017 (1 lot) BEMP/NCB/1.1/21/2 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-06- 2020-01- 2020-02- 2019-08- 2020-03- 2019-12- 2020-04- 2020-01- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 531,497.59 Signed Envelope 09 26 14 25 13 26 09 30 15 27 education (GSE) facilities in secondary education Vitebsk Oblast – 2017 (1 lot) BEMP/NCB/1.1/5 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2016-04- 2020-01- 2020-02- 2016-05- 2020-03- 2016-06- 2020-04- 2016-08- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 288,991.81 Signed Envelope 08 13 13 24 16 25 10 29 29 26 education (GSE) facilities in secondary education Minsk Oblast – 2016 (1 lot) BEMP/NCB/1.1/3-16-7 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2016-06- 2020-01- 2020-02- 2016-07- 2020-03- 2016-09- 2020-04- 2016-09- 2020-10- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 50,384.71 Signed Envelope 04 13 09 20 13 21 07 25 30 22 education (GSE) facilities in secondary education Gomel Oblast – 2016 BEMP/NCB/1.1/41/2 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-09- 2020-02- 2020-03- 2019-10- 2020-04- 2020-02- 2020-05- 2020-03- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 380,739.86 Signed Envelope 28 13 02 15 14 14 05 19 27 15 education (GSE) facilities in secondary education Gomel Oblast – 2018 (2 lots) BEMP/NCB/1.1/41/1/1/1 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-01- 2019-10- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-04- 2020-11- IBRD / 85290 management in general Post Request for Bids Open - National 316,397.77 Signed education (GSE) facilities in Envelope 28 25 02 15 05 14 25 19 29 15 secondary education Gomel Oblast – 2018 (3 objects) BEMP/NCB/1.1/43 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-08- 2020-02- 2020-03- 2019-09- 2020-04- 2019-12- 2020-05- 2020-01- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 541,906.31 Signed Envelope 28 19 02 15 23 14 23 19 27 15 education (GSE) facilities in secondary education Mogilev Oblast – 2018 (3 lots) Page 1 BEMP/NCB/1.1/43/3 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-10- 2020-02- 2020-03- 2019-11- 2020-04- 2019-12- 2020-05- 2020-01- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 542,355.99 Signed Envelope 28 04 02 15 11 14 24 19 30 15 education (GSE) facilities in secondary education Mogilev Oblast – 2018 (2 lots) BEMP/NCB/1.1/43/2 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-01- 2019-09- 2020-02- 2020-03- 2020-02- 2020-04- 2020-02- 2020-05- 2020-11- IBRD / 85290 management in general Post Request for Bids Open - National 0.00 Canceled education (GSE) facilities in Envelope 28 16 02 15 14 14 17 19 15 secondary education Mogilev Oblast – 2018 (Slavgorod) BEMP/NCB/1.1/43/4 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-01- 2019-12- 2020-02- 2020-03- 2020-01- 2020-04- 2020-03- 2020-05- 2020-04- 2020-11- IBRD / 85290 management in general Post Request for Bids Open - National 913,262.24 Signed education (GSE) facilities in Envelope 28 24 02 15 24 14 10 19 17 15 secondary education Mogilev Oblast – 2018 (Myshkovichi) BEMP/NCB/1.1/43/5 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-01- 2019-12- 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-11- IBRD / 85290 management in general Post Request for Bids Open - National 0.00 Canceled education (GSE) facilities in Envelope 28 27 02 15 17 14 08 19 15 secondary education Mogilev Oblast – 2018 (Vyazie) BEMP/NCB/1.1/39 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-08- 2020-02- 2020-03- 2019-10- 2020-04- 2020-01- 2020-05- 2020-02- 2020-11- 2020- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 411,241.39 Completed Envelope 28 23 02 15 29 14 14 19 07 15 10-27 education (GSE) facilities in secondary education Brest Oblast – 2018 BEMP/NCB/1.1/39/1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2019-10- 2020-02- 2020-03- 2019-11- 2020-04- 2020-01- 2020-05- 2020-03- 2020-11- 2020- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 427,927.91 Signed Envelope 28 08 02 15 20 14 14 19 12 15 12-30 education (GSE) facilities in secondary education Brest Oblast – 2018 (Lots 2) BEMP/NCB/1.1/20/3-1 / Reconstruction and capital Modernization of system Single Stage - One 2020-01- 2018-12- 2020-02- 2020-03- 2019-01- 2020-04- 2019-02- 2020-05- 2019-02- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 711,949.93 Signed Envelope 29 22 03 16 23 15 06 20 28 16 education (GSE) facilities in secondary education Brest Oblast - 2017 BEMP/NCB/1.1/3-16 -3 / Reconstruction and capital Modernization of system Single Stage - One 2020-02- 2016-05- 2020-02- 2020-03- 2016-05- 2020-04- 2016-07- 2020-05- 2016-08- 2020-11- repairs of general secondary IBRD / 85290 management in general Post Request for Bids Open - National 470,662.99 Signed Envelope 06 04 11 24 25 23 05 28 08 24 education (GSE) facilities in secondary education Gomel Oblast – 2016 (1 lot) BEMP/NCB/1.1/21/3 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-01- 2019-10- 2020-01- 2020-02- 2019-11- 2020-03- 2020-02- 2020-04- 2020-05- 2020-10- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 566,625.85 Signed receiving students from Envelope 09 17 14 25 19 26 24 30 14 27 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast – 2017 (1 lot) BEMP/AF/1.1/4 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 1,220,843.8 2020-05- 2020-05- 2020-06- 2020-07- 2020-06- 2020-08- 2020-07- 2020-09- 2020-09- 2021-03- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 4 27 15 01 13 26 12 28 16 07 15 education facilities in Grodno closed/reorganized schools Oblast - 2020 BEMP/NCB/1.1/56 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-03- 2020-03- 2020-03- 2020-05- 2020-04- 2020-05- 2020-05- 2020-07- 2020-05- 2021-01- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 315,575.96 Signed receiving students from Envelope 15 05 20 01 07 31 06 05 22 01 education (GSE) facilities in closed/reorganized schools Gomel Oblast BEMP/NCB/1.1/42/3 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-03- 2020-03- 2020-03- 2020-05- 2020-04- 2020-05- 2020-06- 2020-07- 2021-01- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 15 03 20 01 21 31 19 05 01 education (GSE) facilities in closed/reorganized schools Minsk Oblast – 2018 (2 lots) BEMP/NCB/1.1/40 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-07- 2020-08- 2020-09- 2020-10- 2020-11- 2021-05- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 31 05 16 16 20 19 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast – 2018 (2 Lots) BEMP/AF/3/52 / Maintenance of the premises Project implementation Request for Single Stage - One 2020-05- 2020-07- 2021-01- IBRD / 89430 Post Open - National 0.00 Canceled at the address: 12 Makaenka support Quotations Envelope 25 20 16 Str., Minsk 220114; BEMP/NCB/1.1/57 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 2020-04- 2020-03- 2020-04- 2020-05- 2020-05- 2020-06- 2020-05- 2020-07- 2020-06- 2020-10- IBRD / 85290 Post Request for Bids Open - National 146,591.98 Signed education (GSE) facilities in receiving students from Envelope 20 17 20 06 06 05 14 17 22 15 Mogilev Oblast – 2018 closed/reorganized schools (Slavgorod) BEMP/NCB/1.1/60 / Reconstruction and capital Modernization of system repairs of general secondary Single Stage - One 2020-04- 2020-04- 2020-04- 2020-05- 2020-05- 2020-07- 2020-06- 2020-09- 2020-07- 2021-03- IBRD / 85290 management in general Post Request for Bids Open - National 539,636.09 Signed education (GSE) facilities in Envelope 23 20 23 20 26 20 12 02 10 01 secondary education Mogilev Oblast – 2018 (Vyazie) BEMP/NCB/1.1/59 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-04- 2020-04- 2020-05- 2020-06- 2020-06- 2020-09- 2020-06- 2020-10- 2020-07- 2021-04- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 927,951.58 Signed receiving students from Envelope 30 29 07 18 01 16 23 28 20 26 education (GSE) facilities in closed/reorganized schools Gomel Oblast – 2019 (6 lots) BEMP/NCB/1.1/61 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-04- 2020-05- 2020-05- 2020-06- 2020-06- 2020-09- 2020-06- 2020-11- 2020-07- 2021-05- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 579,096.20 Signed receiving students from Envelope 30 06 14 25 08 23 19 04 08 03 education (GSE) facilities in closed/reorganized schools Minsk Oblast – 2020 (2 lots) BEMP/NCB/1.1/58 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-05- 2020-05- 2020-05- 2020-06- 2020-06- 2020-09- 2020-06- 2020-11- 2021-02- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 04 06 18 29 08 27 18 08 06 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast – 2018 (3 lots) BEMP/NCB/1.1/62 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 2020-05- 2020-05- 2020-05- 2020-07- 2020-06- 2020-10- 2020-07- 2020-11- 2020-07- 2021-05- IBRD / 85290 Post Request for Bids Open - National 270,461.25 Signed education (GSE) facilities in receiving students from Envelope 17 15 31 12 15 10 10 21 31 20 Mogilev Oblast – 2019 closed/reorganized schools (Batsevichi) BEMP/NCB/1.1/65 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-05- 2020-05- 2020-05- 2020-07- 2020-06- 2020-08- 2020-07- 2020-09- 2020-07- 2021-03- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 306,870.07 Signed receiving students from Envelope 22 22 27 08 22 07 09 11 23 10 education (GSE) facilities in closed/reorganized schools Grodno Oblast (Vertilishki) BEMP/AF/1.1/2 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2,116,303.4 2020-04- 2020-05- 2020-05- 2020-06- 2020-07- 2020-09- 2020-07- 2020-10- 2020-08- 2021-04- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 9 30 22 05 22 06 02 22 07 27 05 education facilities in Vitebsk closed/reorganized schools Oblast - 2020 BEMP/NCB/1.1/66 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- 2021-03- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 201,112.27 Signed receiving students from Envelope 09 09 14 26 09 25 03 29 03 28 education (GSE) facilities in closed/reorganized schools Gomel Oblast – 2020 BEMP/NCB/1.1/58/1 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2020-09- 2020-09- 2021-03- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 544,966.36 Signed receiving students from Envelope 19 19 24 20 20 29 31 02 20 01 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast – 2018 (3 lots) Page 2 BEMP/NCB/1.1/67 / Capital Ensuring a quality learning repair in the SEI "Perekolskaya environment in schools Single Stage - One 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- 2020-11- 2020-09- 2021-05- secondary school" in the IBRD / 85290 Post Request for Bids Open - National 299,114.48 Signed receiving students from Envelope 15 07 20 31 26 30 08 04 28 03 village of Percoll Klichev closed/reorganized schools district BEMP/AF/1.1/7 / Capital Ensuring a quality learning repair and modernization of environment in schools Single Stage - One 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2021-04- the secondary school No. 1 in IBRD / 89430 Post Request for Bids Open - National 413,461.55 Signed receiving students from Envelope 10 02 15 26 03 25 07 30 11 28 Klimovichi, 3 Starovoitova str. closed/reorganized schools (first starting complex) BEMP/AF/1.1/1 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-07- 2020-09- 2020-10- 2020-09- 2020-11- 2020-10- 2020-12- 2020-11- 2021-06- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 287,132.16 Signed receiving students from Envelope 27 29 01 13 09 12 01 17 09 15 education facilities in Brest closed/reorganized schools Oblast - 2020 BEMP/AF/1.1/3 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-07- 2020-07- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2020-11- 2020-10- 2021-05- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 400,159.72 Signed receiving students from Envelope 31 21 05 16 20 16 03 20 09 19 education facilities in Gomel closed/reorganized schools Oblast - 2020 BEMP/AF/1.1/6 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-06- 2020-06- 2020-08- 2020-09- 2020-10- 2021-04- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 25 30 11 10 15 13 education facilities in Mogilev closed/reorganized schools Oblast - 2020 BEMP/AF/1.1/13 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-07- 2020-07- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2020-11- 2020-09- 2021-05- 2021- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 529,363.70 Completed receiving students from Envelope 31 23 05 16 24 16 02 20 25 19 01-29 education facilities in Vitebsk closed/reorganized schools Oblast BEMP/AF/1.1/14 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-07- 2020-07- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2020-11- 2020-10- 2021-05- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 361,761.68 Signed receiving students from Envelope 31 22 05 16 21 16 02 20 20 19 education facilities in Grodno closed/reorganized schools Oblast BEMP/3/52 / Maintenance of the premises at the address: Project implementation Request for Single Stage - One 2020-08- 2020-09- 2020-09- 2021-03- 2020- IBRD / 85290 Post Open - National 9,185.00 Completed 12 Makaenka Str., Minsk support Quotations Envelope 04 29 22 28 12-01 220114; BEMP/NCB/1.1/42/4 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-07- 2020-08- 2020-10- 2020-09- 2021-01- 2020-09- 2021-02- 2020-10- 2021-08- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 434,476.56 Signed receiving students from Envelope 03 29 17 16 04 14 15 25 12 24 education (GSE) facilities in closed/reorganized schools Minsk Oblast – 2019 (2 lots) BEMP/NCB/1.1/68 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-07- 2020-08- 2020-10- 2020-08- 2021-01- 2020-08- 2021-02- 2020-10- 2021-08- 2021- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 304,049.78 Signed receiving students from Envelope 03 27 17 16 25 14 25 25 12 24 05-12 education (GSE) facilities in closed/reorganized schools Brest Oblast – 2019 (2 lots) BEMP/NCB/1.1/69 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-08- 2020-10- 2020-12- 2020-10- 2021-03- 2020-11- 2021-04- 2020-12- 2021-10- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 240,409.20 Signed receiving students from Envelope 07 06 06 05 01 05 12 16 17 13 education (GSE) facilities in closed/reorganized schools Brest Oblast – 2019 BEMP/AF/1.1/15 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-08- 2020-08- 2020-09- 2020-11- 2020-09- 2021-02- 2020-09- 2021-03- 2020-10- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 699,817.75 Signed receiving students from Envelope 28 06 11 10 04 08 15 22 20 18 education facilities in Vitebsk closed/reorganized schools Oblast (2 lots) BEMP/AF/1.1/16 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 1,045,426.9 2020-08- 2020-08- 2020-09- 2020-11- 2020-09- 2021-02- 2020-10- 2021-03- 2020-11- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 8 28 28 11 10 28 08 07 22 18 18 education facilities in Vitebsk closed/reorganized schools Oblast (3 lots) BEMP/AF/1.1/8 / "Capital repair with elements of Ensuring a quality learning modernization and environment in schools Single Stage - One 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-11- 2021-05- IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled rehabilitation of the receiving students from Envelope 13 08 18 29 10 28 28 02 01 secondary school No. 1 in closed/reorganized schools Postavu" (first starting complex) BEMP/AF/4/1.1/17 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-09- 2020-09- 2020-10- 2020-12- 2020-10- 2021-03- 2020-10- 2021-05- 2020-11- 2021-06- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 38,223.91 Signed receiving students from Envelope 30 10 28 27 09 27 20 08 26 07 education facility in Grodno closed/reorganized schools Oblast (Mosty) BEMP/AF/2/1.1/18 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 1,320,516.3 2020-09- 2020-09- 2020-10- 2020-12- 2020-10- 2021-03- 2020-11- 2021-05- 2021-02- 2021-08- IBRD / 89430 Post Request for Bids Open - National Signed education facilities in Vitebsk receiving students from Envelope 7 30 22 28 27 30 27 24 08 08 06 Oblast (Babinichi, Bolbasovo, closed/reorganized schools Sharkovschina, Glubokoe) BEMP/NCB/1.1/70 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 2020-10- 2020-10- 2020-11- 2021-01- 2020-11- 2021-02- 2020-11- 2021-03- 2020-12- 2021-05- IBRD / 85290 Post Request for Bids Open - National 80,879.63 Signed education facilities in Brest receiving students from Envelope 09 05 06 05 05 04 18 18 10 17 Oblast 2019 (Lipniki, closed/reorganized schools Lubachin) BEMP/NCB/1.1/72 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-09- 2020-09- 2020-10- 2020-12- 2020-10- 2021-03- 2020-11- 2021-05- 2020-12- 2021-08- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 303,401.68 Signed receiving students from Envelope 30 29 28 27 29 27 10 08 04 21 education facility in Mogilev closed/reorganized schools Oblast 2020 (Lopatichi) BEMP/NCB/1.1/71 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-10- 2020-10- 2020-11- 2021-01- 2020-11- 2021-04- 2020-12- 2021-05- 2021-01- 2021-06- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 663,095.99 Signed receiving students from Envelope 15 20 12 11 19 11 17 23 18 01 education facilities in Gomel closed/reorganized schools Oblast 2020 (3 lots) BEMP/AF/2/1.1/19 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 1,103,664.1 2020-11- 2020-10- 2020-12- 2021-02- 2020-11- 2021-05- 2020-12- 2021-06- 2021-01- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 1 05 23 03 01 20 02 11 13 28 11 education facility in Vitebsk closed/reorganized schools Oblast (Gorodok, Braslav) BEMP/AF/1/1.1/20 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-10- 2020-12- 2021-02- 2021-01- 2021-05- 2021-01- 2021-06- 2021-02- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 141,388.00 Signed receiving students from Envelope 05 29 03 01 12 02 20 13 10 11 education facility in Brest closed/reorganized schools Oblast (Cherni) BEMP/AF/2/1.1/21 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-05- 2020-12- 2021-06- 2021-02- 2021-09- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 400,453.84 Signed receiving students from Envelope 05 04 03 01 14 02 21 13 05 11 education facility in Vitebsk closed/reorganized schools Oblast (Polotsk, Oktiabrskii) BEMP/AF/6/1.1/22 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-10- 2020-11- 2020-12- 2020-12- 2021-01- 2020-12- 2021-02- 2021-02- 2021-08- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 711,548.08 Signed receiving students from Envelope 05 29 10 22 01 21 22 25 04 24 education facility in Mogilev closed/reorganized schools Oblast BEMP/NCB/1.1/75 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-05- 2020-12- 2021-06- 2021-02- 2021-09- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 576,227.73 Signed receiving students from Envelope 27 09 11 09 09 10 29 21 05 19 education facility in Mogilev closed/reorganized schools Oblast 2020 (Slavgorod) Page 3 BEMP/NCB/1.1/78 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-05- 2021-01- 2021-06- 2021-01- 2021-09- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 234,332.48 Signed receiving students from Envelope 27 24 11 09 28 10 14 21 28 19 education facilities in Grodno closed/reorganized schools Oblast 2020 (Smorgon) BEMP/NCB/1.1/79 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-05- 2021-01- 2021-06- 2021-02- 2021-09- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 244,231.76 Signed receiving students from Envelope 27 30 11 09 29 10 22 21 05 19 education (GSE) facilities in closed/reorganized schools Vitebsk Oblast BEMP/NCB/1.1/80 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-12- 2020-12- 2021-01- 2021-03- 2021-01- 2021-06- 2021-02- 2021-07- 2021-03- 2021-10- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 471,734.85 Signed receiving students from Envelope 30 21 13 14 28 12 10 24 11 22 education (GSE) facilities in closed/reorganized schools Brest Oblast BEMP/AF/2/1.1/23 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2020-12- 2020-12- 2021-01- 2021-03- 2021-06- 2021-07- 2021-10- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 23 23 06 07 05 17 05 education facility in Vitebsk closed/reorganized schools Oblast (Polotsk) BEMP/3/52-1 / Maintenance of the premises at the Project implementation Request for Single Stage - One 2021-02- 2021-02- 2021-04- 2021-03- 2021-10- IBRD / 85290 Post Open - National 32,215.24 Signed address: 12 Makaenka Str., support Quotations Envelope 11 16 22 24 19 Minsk 220114; BEMP/AF/3/1.1/24 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-01- 2021-01- 2021-02- 2021-04- 2021-02- 2021-07- 2021-03- 2021-08- 2021-04- 2022-03- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 483,956.80 Signed receiving students from Envelope 20 18 03 04 19 03 04 14 02 12 education facilities in Gomel closed/reorganized schools Oblast (Glazovka) BEMP/AF/2/1.1/25 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-01- 2021-02- 2021-04- 2021-03- 2021-07- 2021-03- 2021-08- 2021-04- 2021-12- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 479,080.20 Signed receiving students from Envelope 02 26 16 17 02 16 19 27 27 25 education facilities in Vitebsk closed/reorganized schools Oblast (Beshenkovichi) BEMP/AF/5/1.1/27 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-03- 2021-09- 2021-04- 2022-01- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 277,272.69 Signed receiving students from Envelope 10 03 03 17 03 16 17 10 08 08 education facility in Minsk closed/reorganized schools Oblast (Pogost) BEMP/AF/3/1.1/26 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-04- 2021-09- 2021-05- 2021-12- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 390,738.15 Signed receiving students from Envelope 12 05 05 19 09 18 01 12 05 21 education facilities in Gomel closed/reorganized schools Oblast (Svetilovichi) BEMP/AF/2/1.1/29 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-03- 2021-09- 2021-04- 2021-12- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 646,657.65 Signed receiving students from Envelope 10 05 03 17 10 16 19 10 12 09 education facilities in Vitebsk closed/reorganized schools Oblast (Polotsk) BEMP/NCB/1.1/82 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-05- 2021-03- 2021-08- 2021-04- 2021-09- 2022-04- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 15 19 08 07 22 05 06 30 28 education facility in Brest closed/reorganized schools Oblast (Nacha, Perkovichi) BEMP/AF/4/1.1/28 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-04- 2021-09- 2021-04- 2021-11- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 120,714.90 Signed receiving students from Envelope 23 17 16 30 17 29 02 23 26 22 education facility in Grodno closed/reorganized schools Oblast (Smorgon 1) BEMP/AF/2/1.1/30 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 1,037,495.9 2021-02- 2021-02- 2021-03- 2021-04- 2021-03- 2021-07- 2021-04- 2021-09- 2021-05- 2022-01- IBRD / 89430 Post Request for Bids Open - National Signed education facility in Vitebsk receiving students from Envelope 1 23 19 16 30 23 29 20 23 24 21 Oblast (Glubokoe, Ushachi, closed/reorganized schools Borovka, Zaslonovo) BEMP/AF/5/1.1/33 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-03- 2021-03- 2021-03- 2021-04- 2021-03- 2021-07- 2021-04- 2021-08- 2021-05- 2021-11- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 226,615.12 Signed receiving students from Envelope 10 02 31 04 17 03 19 28 24 06 education facilities in Minsk closed/reorganized schools Oblast (Bokshitsy) BEMP/AF/4/1.1/31 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-05- 2021-04- 2021-06- 2021-12- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 09 04 14 25 05 25 29 29 26 education facilities in Grodno closed/reorganized schools Oblast (Gozha) BEMP/AF/2/1.1/32 / Reconstruction and capital Ensuring a quality learning repairs of general secondary environment in schools Single Stage - One 1,224,448.4 2021-03- 2021-03- 2021-04- 2021-06- 2021-04- 2021-09- 2021-05- 2021-10- 2021-06- 2022-02- education facilities in Vitebsk IBRD / 89430 Post Request for Bids Open - National Signed receiving students from Envelope 4 31 24 21 05 19 03 05 29 17 26 Oblast (Dubrovno, closed/reorganized schools Novolukoml, Liozno, Babinichi) BEMP/AF/6/1.1/34 / Ensuring a quality learning Reconstruction and capital environment in schools Single Stage - One 2021-04- 2021-04- 2021-05- 2021-06- 2021-05- 2021-09- 2021-05- 2021-11- 2022-03- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National 0.00 Canceled receiving students from Envelope 14 02 05 19 04 17 19 12 12 education facilities in Mogilev closed/reorganized schools Oblast (Klimovichi 4) BEMP/NCB/1.1/84 / Ensuring a quality learning Reconstruction and capital Under environment in schools Single Stage - One 2021-04- 2021-03- 2021-05- 2021-06- 2021-04- 2021-09- 2021-06- 2021-11- 2022-01- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 319,501.14 Implementa receiving students from Envelope 14 30 05 19 30 17 08 12 01 education facilities in Mogilev tion closed/reorganized schools Oblast (Klimovichi 1) BEMP/NCB/1.1/85 / Ensuring a quality learning Reconstruction and capital Under environment in schools Single Stage - One 2021-04- 2021-04- 2021-05- 2021-07- 2021-05- 2021-10- 2021-11- 2022-01- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Implementa receiving students from Envelope 30 21 21 05 21 03 28 17 education facility in Vitebsk tion closed/reorganized schools Oblast (Ostrovno) BEMP/NCB/1.1/86 / Ensuring a quality learning Reconstruction and capital Under environment in schools Single Stage - One 2021-04- 2021-04- 2021-05- 2021-06- 2021-05- 2021-09- 2021-06- 2021-11- 2022-02- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National 0.00 Implementa receiving students from Envelope 23 22 14 28 24 26 15 21 19 education facilities in Grodno tion closed/reorganized schools Oblast (Ostroves) BEMP/NCB/1.1/87 / Reconstruction and capital Request for Ensuring a quality learning repairs of general secondary Bids - Small Under environment in schools Single Stage - One 2021-04- 2021-04- 2021-05- 2021-07- 2021-05- 2021-10- 2021-11- 2022-05- education facility in Brest IBRD / 85290 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 30 29 21 05 31 03 28 27 Oblast (Nacha, Bostun, envelope tion closed/reorganized schools Mikashevichi,Perkovichi, process) Kroshin, Mir) BEMP/AF/4/1.1/38 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-06- 2021-07- 2021-06- 2021-10- 2021-12- 2022-04- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 12 05 02 17 07 15 10 19 education facilities in Gomel envelope tion closed/reorganized schools Oblast (Novogrudok) process) BEMP/AF/2/1.1/35 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-03- 2021-05- 2021-07- 2021-04- 2021-10- 2021-05- 2021-12- 2022-03- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 07 30 28 12 30 10 19 05 15 education facility in Vitebsk envelope tion closed/reorganized schools Oblast (Rossony) process) BEMP/AF/2/1.1/36 / Request for Reconstruction and capital Ensuring a quality learning Bids - Small Under repairs of general secondary environment in schools Single Stage - One 2021-05- 2021-04- 2021-05- 2021-07- 2021-05- 2021-10- 2021-12- 2022-03- IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa education facility in Vitebsk receiving students from Envelope 07 25 28 12 28 10 05 25 envelope tion Oblast (Glubokoe, Ushachi, closed/reorganized schools process) Bigosovo) Page 4 BEMP/AF/4/1.1/37 / Request for Reconstruction and capital Ensuring a quality learning Bids - Small Under repairs of general secondary environment in schools Single Stage - One 2021-05- 2021-04- 2021-05- 2021-07- 2021-05- 2021-10- 2021-06- 2021-12- 2022-05- IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa education facility in Grodno receiving students from Envelope 07 26 28 12 27 10 11 05 14 envelope tion Oblast (Diatlovo, Zheludok, closed/reorganized schools process) Porozovo) BEMP/NCB/1.1/89 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-06- 2021-07- 2021-06- 2021-10- 2021-12- 2022-06- repairs of general secondary IBRD / 85290 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 14 07 04 19 08 17 12 10 education facility in Brest envelope tion closed/reorganized schools Oblast (Kossovo) process) BEMP/AF/4/1.1/39 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-06- 2021-08- 2022-02- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 07 05 12 23 25 23 08 27 23 education facility in Grodno envelope tion closed/reorganized schools Oblast (Gozha) process) BEMP/AF/3/1.1/41 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-06- 2021-07- 2021-06- 2021-10- 2021-12- 2022-06- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 21 21 11 26 18 24 19 17 education facility in Gomel envelope tion closed/reorganized schools Oblast (Rovkovichi) process) BEMP/AF/6/1.1/40 / Request for Ensuring a quality learning Reconstruction and capital Bids - Small Under environment in schools Single Stage - One 2021-05- 2021-05- 2021-06- 2021-08- 2021-10- 2021-12- 2022-04- repairs of general secondary IBRD / 89430 Post Request for Bids Open - National Works SPD (1 0.00 Implementa receiving students from Envelope 27 27 17 01 30 25 24 education facilities in Mogilev envelope tion closed/reorganized schools Oblast (Klimovichi 4) process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/ICB/1.2/1/1 / Supply of educational equipment for Computer Science Ensuring a quality learning classrooms, including environment in schools Open - Single Stage - One 2018-07- 2018-08- installation and setup, in IBRD / 85290 Prior Request for Bids 855,630.00 Signed receiving students from International Envelope 09 15 Grodno Oblast, Mogilev closed/reorganized schools Oblast, Vitebsk Oblast, Minsk Oblast, Brest Oblast and Gomel Oblast (22 classrooms) BEMP/ICB/1.2/1 / Supply of equipment for subject Modernization of system laboratories Physics, Open - Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-10- IBRD / 85290 management in general Prior Request for Bids 0.00 Canceled Chemistry, Biology and International Envelope 08 13 24 25 29 26 secondary education Computer Science (installation and setup) 2016 BEMP/ICB/1.2/4 / Supply of Modernization of system equipment for subject Open - Single Stage - One 2020-01- 2018-12- 2020-01- 2020-02- 2019-02- 2020-03- 2019-06- 2020-04- 2019-08- 2020-10- IBRD / 85290 management in general Post Request for Bids 698,567.68 Signed laboratories Biology International Envelope 08 27 13 24 15 25 10 29 16 26 secondary education (installation and setup) 2016 BEMP/ICB/1.2/2 / Supply of educational equipment for Physics, Chemistry, Biology Modernization of system Open - Single Stage - One 2020-01- 2020-01- 2020-01- 2020-02- 2019-12- 2020-03- 2020-04- 2020-04- 2020-06- 2020-10- and Computer Science IBRD / 85290 management in general Prior Request for Bids 1,304,928.00 Signed International Envelope 08 28 13 24 12 25 29 29 19 26 classrooms, including secondary education installation and setup, second stage BEMP/AF/2.2/6 / Purchase of Modernization of system Request for Single Stage - One 2020-01- 2020-01- 2020-03- 2020-01- 2020-09- 2020-03- consumables for the National IBRD / 89430 management in general Post Limited 1,851.18 Completed Quotations Envelope 20 20 16 27 12 02 Center secondary education BEMP/ICB/1.2/3 / Supply of educational equipment for Ensuring a quality learning Physics, Chemistry, Biology environment in schools Open - Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-10- and Computer Science IBRD / 85290 Prior Request for Bids 0.00 Canceled receiving students from International Envelope 08 13 24 25 29 26 classrooms, including closed/reorganized schools installation and setup, third stage BEMP/ICB/1.2/5 / Supply of educational equipment for Ensuring a quality learning Physics, Chemistry and environment in schools Open - Single Stage - One 2020-05- 2020-05- 2020-05- 2020-05- 2020-06- 2020-07- 2020-07- 2020-09- 2020-09- 2020-11- 2021-03- IBRD / 85290 Post Request for Bids 1,059,549.34 Signed Biology classrooms, including receiving students from International Envelope 18 22 18 22 29 24 29 22 02 16 01 installation and setup, third closed/reorganized schools stage BEMP/2.1/4 / Purchase of Modernization of system Request for Single Stage - One 2020-10- 2020-12- 2020-10- 2021-06- equipment and licensed IBRD / 85290 management in general Post Open - National 44,002.08 Signed Quotations Envelope 19 14 20 12 software secondary education BEMP/2.3/3 / provision of services for the creation of an Modernization of system information management Single Stage - One 2020-12- 2020-07- 2020-12- 2021-01- 2020-11- 2021-02- 2021-03- 2021-09- IBRD / 85290 management in general Post Request for Bids Open - National 0.00 Canceled system in the education Envelope 01 24 06 17 20 16 23 19 secondary education sector of the Republic of Belarus BEMP/AF/2.2/6-1 / Purchase Modernization of system Request for Single Stage - One 2021-01- 2021-04- 2021-01- 2021-05- 2021-03- of consumables for the IBRD / 89430 management in general Post Open - National 2,969.81 Completed Quotations Envelope 18 05 29 05 23 National Center secondary education BEMP/AF/RFB/1.2/1 / Supply Ensuring a quality learning of educational equipment for Under environment in schools 2021-02- 2021-04- 2021-03- 2021-04- 2021-05- 2021-06- 2021-09- 2021-10- 2022-04- Physics, Chemistry and IBRD / 89430 Prior Request for Bids 0.00 Implementati receiving students from 24 06 10 07 09 09 06 18 16 Biology classrooms, including on closed/reorganized schools installation and setup BEMP/AF/RFB/1.2/2 / Supply Ensuring a quality learning of furniture for Physics, Under environment in schools Single Stage - One 2021-03- 2021-03- 2021-04- 2021-06- 2021-05- 2021-09- 2021-10- 2022-04- Chemistry and Biology IBRD / 89430 Post Request for Bids Open - National 0.00 Implementati receiving students from Envelope 31 24 21 05 14 03 29 27 classrooms, including on closed/reorganized schools installation and setup NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/2.3/4 / provision of services for the creation of an Modernization of system information management Single Stage - One 2020-12- 2020-12- 2020-12- 2021-02- 2021-02- 2021-05- 2021-05- 2021-06- 2021-05- 2021-12- IBRD / 85290 management in general Post Request for Bids Open - National 984,000.00 Signed system in the education Envelope 14 11 28 11 24 12 13 23 31 20 secondary education sector of the Republic of Belarus CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/CQS/1.1/18-1 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools Open - 2016-11- 2016-11- reconstruction and capital IBRD / 85290 Prior Qualification 2,966.95 Signed receiving students from International 02 04 repairs of GSE facilities in Selection closed/reorganized schools Minsk Oblast 2016. Lyuban district. Page 5 BEMP/CQS/1.1/18-2 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools Open - 2016-11- 2016-11- reconstruction and capital IBRD / 85290 Prior Qualification 2,108.33 Signed receiving students from International 02 04 repairs of GSE facilities in Selection closed/reorganized schools Minsk Oblast 2016. Cherven district. BEMP/QCBS/1.1/9 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Open - 2017-05- 2017-05- IBRD / 85290 Prior 67,741.15 Signed reconstruction and capital receiving students from Based Selection International 15 23 repairs of GSE facilities in closed/reorganized schools Gomel Oblast 2017 BEMP/QCBS/1.1/46 / Development of construction Modernization of system design documentation for Quality And Cost- 2018-05- 2020-01- 2020-03- 2018-11- 2020-04- 2018-12- 2020-05- 2019-01- 2020-06- 2019-02- 2020-07- 2019-04- 2021-07- IBRD / 85290 management in general Post Open - National 51,180.87 Signed 2020-01-04 reconstruction and capital Based Selection 15 25 09 06 06 10 06 21 10 14 15 30 15 secondary education repairs of GSE facilities in Gomel Oblast – 2019 BEMP/QCBS/1.1/44 / Development of construction Modernization of system design documentation for Quality And Cost- 2018-06- 2020-01- 2020-03- 2018-11- 2020-04- 2018-12- 2020-05- 2019-03- 2020-06- 2019-03- 2020-07- 2019-04- 2021-07- IBRD / 85290 management in general Post Open - National 82,013.19 Signed 2020-01-08 reconstruction and capital Based Selection 01 29 13 06 10 17 10 01 14 05 19 30 19 secondary education repairs of GSE facilities in Brest Oblast – 2019 BEMP/QCBS/1.1/48 / Development of construction Modernization of system design documentation for Quality And Cost- 2018-03- 2020-01- 2020-03- 2018-12- 2020-04- 2019-01- 2020-05- 2019-03- 2020-06- 2019-03- 2020-07- 2019-06- 2021-07- IBRD / 85290 management in general Post Open - National 58,401.64 Signed 2020-01-08 reconstruction and capital Based Selection 27 29 13 12 10 11 10 20 14 28 19 13 19 secondary education repairs of GSE facilities in Mogilev Oblast – 2019 BEMP/QCDS/1.1/47 / Development of construction Modernization of system design documentation for Quality And Cost- 2018-03- 2020-01- 2020-03- 2018-12- 2020-04- 2019-01- 2020-05- 2019-03- 2020-06- 2019-03- 2020-07- 2019-07- 2021-07- IBRD / 85290 management in general Post Open - National 32,097.00 Signed 2020-01-08 reconstruction and capital Based Selection 28 29 13 12 10 11 10 20 14 28 19 08 19 secondary education repairs of GSE facilities in Minsk Oblast – 2019 BEMP/QCBS/1.1/27 / Development of construction Modernization of system design documentation for Quality And Cost- 2017-11- 2020-01- 2020-03- 2018-03- 2020-04- 2018-04- 2020-05- 2018-05- 2020-06- 2018-05- 2020-07- 2018-09- 2021-07- IBRD / 85290 management in general Post Open - National 36,860.00 Signed 2020-01-09 reconstruction and capital Based Selection 03 30 14 28 11 27 11 11 15 17 20 24 20 secondary education repairs of GSE facilities in Vitebsk Oblast – 2018 BEMP/CQS/1.1/24 / Development of construction Modernization of system Consultant design documentation for 2018-12- 2020-01- 2020-03- 2019-01- 2020-04- 2019-03- 2020-05- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 0.00 Canceled 2020-01-09 reconstruction and capital 17 30 14 28 13 20 18 14 secondary education Selection repairs of GSE facilities in Vitebsk Oblast BEMP/CQS/1.1/33/1 / Integrated management and Modernization of system Consultant technical supervision of the 2018-12- 2020-02- 2020-03- 2018-12- 2020-04- 2019-01- 2020-05- 2019-01- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 13,887.57 Signed 2020-01-15 reconstruction and capital 11 05 20 28 19 15 24 16 20 secondary education Selection repairs of GSE facilities in Brest Oblast – 2017 (3 objects) BEMP/CQS/1.1/52 / Integrated management and Modernization of system Consultant technical supervision of the 2019-05- 2020-02- 2020-03- 2019-07- 2020-04- 2019-08- 2020-05- 2020-10- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 11,468.02 Signed 2020-01-15 reconstruction and capital 07 05 20 17 19 15 24 06 20 secondary education Selection repairs of GSE facilities in Minsk Oblast – 2018 BEMP/CQS/1.1/51/1 / Integrated management and technical supervision of the Modernization of system Consultant 2019-07- 2020-02- 2020-03- 2019-10- 2020-04- 2019-10- 2020-05- 2020-05- 2020-11- reconstruction and capital IBRD / 85290 management in general Post Qualification Open - National 55,922.76 Signed 2020-01-15 07 05 20 02 19 29 24 18 20 repairs of GSE facilities in secondary education Selection Gomel Oblast – 2018 (7 objects) BEMP/CQS/1.1/33 / Integrated management and Modernization of system Consultant technical supervision of the 2018-06- 2020-02- 2020-03- 2018-09- 2020-04- 2018-10- 2020-05- 2018-10- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 14,728.39 Signed 2020-01-15 reconstruction and capital 13 05 20 14 19 03 24 12 20 secondary education Selection repairs of GSE facilities in Brest Oblast – 2017 (7 objects) BEMP/CQS/1.1/38/1 / Integrated management and Modernization of system Consultant technical supervision of the 2018-11- 2020-02- 2020-03- 2019-01- 2020-04- 2019-03- 2020-05- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 0.00 Canceled 2020-01-15 reconstruction and capital 13 05 20 28 19 21 24 20 secondary education Selection repairs of GSE facilities in Mogilev Oblast – 2017 BEMP/CQS/1.1/51 / Integrated management and Modernization of system Consultant technical supervision of the 2019-02- 2020-02- 2020-03- 2019-06- 2020-04- 2019-06- 2020-05- 2019-06- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 14,033.20 Signed 2020-01-15 reconstruction and capital 26 05 20 06 19 20 24 24 20 secondary education Selection repairs of GSE facilities in Gomel Oblast – 2018 BEMP/CQS/1.1/35 / Integrated management and Modernization of system Consultant technical supervision of the 2018-02- 2020-02- 2020-03- 2018-03- 2020-04- 2018-04- 2020-05- 2018-04- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 6,879.47 Signed 2020-01-15 reconstruction and capital 07 05 20 27 19 28 24 28 20 secondary education Selection repairs of GSE facilities in Gomel Oblast – 2017 BEMP/CQS/1.1/38 / Integrated management and Modernization of system Consultant technical supervision of the 2018-08- 2020-02- 2020-03- 2018-11- 2020-04- 2018-11- 2020-05- 2020-11- IBRD / 85290 management in general Post Qualification Open - National 0.00 Canceled 2020-01-15 reconstruction and capital 08 05 20 06 19 22 24 20 secondary education Selection repairs of GSE facilities in Mogilev Oblast – 2017 BEMP/CQS/1.1/34 / Development of construction Modernization of system Consultant design documentation for 2018-10- 2020-02- 2020-04- 2019-01- 2020-05- 2019-03- 2020-06- 2019-05- 2020-12- IBRD / 85290 management in general Post Qualification Open - National 6,600.59 Signed 2020-01-29 reconstruction and capital 10 19 03 28 03 20 07 22 04 secondary education Selection repairs of GSE facilities in Vitebsk Oblast BEMP/LCS/3/49 / Financial Project implementation Least Cost 2020-02- 2020-03- 2020-04- 2020-02- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-04- 2020-08- 2020-04- 2021-02- audit of the project – 2019 IBRD / 85290 Post Open - National 3,854.92 Signed 2020-02-19 support Selection 17 11 24 25 22 20 21 31 26 06 30 10 26 (loan - 8529-BY) BEMP/CQS//1.1/38/1 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2018-11- 2020-03- 2020-04- 2019-01- 2020-05- 2019-03- 2020-06- 2019-08- 2020-12- IBRD / 85290 Post Qualification Open - National 22,598.01 Signed 2020-02-19 reconstruction and capital receiving students from 13 11 24 28 24 21 28 21 25 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast – 2017 BEMP/CQS//1.1/38 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2018-08- 2020-02- 2020-04- 2018-11- 2020-05- 2018-11- 2020-06- 2018-11- 2020-12- IBRD / 85290 Post Qualification Open - National 1,173.51 Signed 2020-02-04 reconstruction and capital receiving students from 03 25 09 06 09 22 13 23 10 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast – 2017 BEMP/CQS/1.1/49 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2019-08- 2020-02- 2020-04- 2020-01- 2020-05- 2020-01- 2020-06- 2020-03- 2020-12- IBRD / 85290 Post Qualification Open - National 22,804.19 Signed 2020-02-06 reconstruction and capital receiving students from 23 27 11 03 11 17 15 02 12 Selection repairs of GSE facilities in closed/reorganized schools Brest Oblast BEMP/CQS/1.1/53 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2019-08- 2020-02- 2020-04- 2019-11- 2020-05- 2019-12- 2020-06- 2020-02- 2020-12- IBRD / 85290 Post Qualification Open - National 28,782.36 Signed 2020-02-06 reconstruction and capital receiving students from 14 27 11 05 11 30 15 12 12 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast Page 6 BEMP/CQS/1.1/53/1 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2019-09- 2020-02- 2020-04- 2020-05- 2020-05- 2020-06- 2020-06- 2020-06- 2020-12- IBRD / 85290 Post Qualification Open - National 13,381.25 Signed 2020-02-06 reconstruction and capital receiving students from 27 27 11 22 11 12 15 22 12 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast BEMP/QCBS/1.1/55 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2019-05- 2020-02- 2020-04- 2019-09- 2020-05- 2019-10- 2020-06- 2019-11- 2020-07- 2019-11- 2020-08- 2020-01- 2021-08- IBRD / 85290 Post Open - National 27,724.83 Signed 2020-02-06 reconstruction and capital receiving students from Based Selection 28 27 11 16 09 16 08 18 13 25 17 29 17 repairs of GSE facilities in closed/reorganized schools Gomel Oblast BEMP/QCBS/1.1/54 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2019-03- 2020-02- 2020-04- 2019-08- 2020-05- 2019-09- 2020-06- 2019-11- 2020-07- 2019-11- 2020-08- 2020-02- 2021-08- IBRD / 85290 Post Open - National 38,415.45 Signed 2020-02-07 reconstruction and capital receiving students from Based Selection 05 28 12 22 10 26 09 11 14 25 18 26 18 repairs of GSE facilities in closed/reorganized schools Brest Oblast BEMP/CQS/1.1/34/1 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2019-10- 2020-02- 2020-04- 2020-03- 2020-05- 2020-04- 2020-06- 2020-05- 2020-12- IBRD / 85290 Post Qualification Open - National 6,155.47 Signed 2020-02-06 reconstruction and capital receiving students from 17 27 11 13 11 08 15 06 12 Selection repairs of GSE facilities in closed/reorganized schools Vitebsk Oblast BEMP/AF/2.5/8-2 / Procurement of consulting Modernization of system Consultant 2020-04- 2020-06- 2020-07- 2020-09- 2020-08- 2020-09- 2020-10- 2021-01- 2021-04- 2021-06- services on improving the IBRD / 89430 management in general Post Qualification Open - National 1,119.75 Completed 2020-05-27 30 17 31 21 30 18 04 18 02 07 educational environment of secondary education Selection GSEI BEMP/AF/2.5/8-3 / Procurement of consulting Modernization of system Consultant services on the 2020-04- 2020-06- 2020-07- 2020-09- 2020-08- 2020-09- 2020-10- 2020-11- 2021-04- 2021-03- IBRD / 89430 management in general Post Qualification Open - National 1,342.73 Completed 2020-05-27 implementation of new 24 17 31 21 30 18 04 02 02 17 secondary education Selection approaches to assessing the quality of education BEMP/CQS/1.1/64 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools 2020-03- 2020-06- 2020-07- 2020-06- 2020-08- 2020-06- 2020-09- 2020-10- 2021-03- reconstruction and capital IBRD / 85290 Post Qualification Open - National 5,982.20 Signed 2020-06-15 receiving students from 10 29 13 02 12 24 16 08 15 repairs of GSE facilities in Selection closed/reorganized schools Vitebsk Oblast – 2018 (Liozno, Volynets) BEMP/AF/2.5/1-1 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “Management system modernization of general secondary educat BEMP/AF/2.5/1-2 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “Using combined complexes of physics, chemistry, biology and BEMP/AF/2.5/1-3 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “New approaches to the education quality assessment”; BEMP/AF/2.5/1-4 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “Improving the educational environment of educational instit BEMP/AF/2.5/1-5 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 10 13 26 25 30 28 training of heads of general secondary education Selection secondary education institutions “Organization of educational institutions activities as soci BEMP/AF/2.5/1-6 / Rendering consulting services for the development of scientific and methodological Modernization of system Consultant support of the educational 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-04- IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-06-22 programme for advanced 10 13 26 25 30 28 secondary education Selection training of heads of general secondary education institutions “Education quality management BEMP/AF/1.4/3 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2020-07- 2020-06- 2020-08- 2020-09- 2020-09- 2020-11- 2020-10- 2021-01- 2020-11- 2021-02- 2020-12- 2021-04- 2021-12- IBRD / 89430 Post Open - National 205,040.41 Signed 2020-06-09 reconstruction and capital receiving students from Based Selection 14 30 13 17 10 23 10 29 14 24 19 06 19 repairs of GSEIs (Mogilev closed/reorganized schools region) BEMP/AF/1.1/9 / Ensuring a quality learning Development of construction environment in schools Quality And Cost- 2020-07- 2020-10- 2020-12- 2020-10- 2021-01- 2020-11- 2021-01- 2021-01- 2021-03- 2021-02- 2021-04- 2021-05- 2022-04- design documentation for IBRD / 89430 Post Open - National 135,891.71 Signed 2020-09-30 receiving students from Based Selection 27 21 04 29 01 27 31 28 07 17 11 07 11 reconstruction and capital closed/reorganized schools repairs of GSEIs (Brest region) BEMP/AF/1.1/10 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2020-07- 2020-07- 2020-08- 2020-09- 2020-09- 2020-10- 2020-10- 2021-01- 2020-11- 2021-02- 2020-12- 2021-03- 2021-12- IBRD / 89430 Post Open - National 52,785.47 Under Review 2020-06-16 reconstruction and capital receiving students from Based Selection 15 07 20 24 17 26 17 16 21 11 26 29 26 repairs of GSEIs (Gomel closed/reorganized schools region) BEMP/AF/QCBS/1.4/4 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2020-07- 2020-08- 2020-09- 2020-09- 2020-10- 2020-11- 2020-11- 2021-01- 2020-12- 2021-02- 2021-01- 2021-04- 2022-01- IBRD / 89430 Post Open - National 142,667.91 Signed 2020-07-15 reconstruction and capital receiving students from Based Selection 14 05 18 17 16 24 15 29 20 24 24 06 24 repairs of GSEIs (Mogilev closed/reorganized schools region) BEMP/CQS/1.1/63 / Integrated management and Modernization of system Consultant technical supervision of the 2020-05- 2020-09- 2020-10- 2020-07- 2020-11- 2020-07- 2021-01- 2020-08- 2021-07- IBRD / 85290 management in general Post Qualification Open - National 2,734.20 Signed 2020-08-03 reconstruction and capital 15 02 23 16 22 31 10 12 09 secondary education Selection repairs of GSE facilities in Mogilev Oblast – 2019 Page 7 BEMP/AF/CQS/1.1/1 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-07- 2020-09- 2020-10- 2020-09- 2020-11- 2020-10- 2021-01- 2020-10- 2021-07- IBRD / 89430 Post Qualification Open - National 3,500.16 Signed 2020-09-04 reconstruction and capital receiving students from 30 18 09 15 08 21 03 29 02 Selection repairs of GSE facilities in closed/reorganized schools Brest Oblast BEMP/CQS/1.1/67 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-07- 2020-09- 2020-10- 2020-08- 2020-11- 2020-09- 2021-01- 2020-09- 2021-07- IBRD / 85290 Post Qualification Open - National 4,554.90 Signed 2020-09-04 reconstruction and capital receiving students from 07 18 09 11 08 07 03 22 02 Selection repairs of GSE facilities in closed/reorganized schools Mogilev Oblast – 2019 BEMP/CQS/1.1/73 / Integrated management and Modernization of system Consultant technical supervision of the 2020-09- 2020-11- 2021-01- 2020-10- 2021-02- 2020-11- 2021-03- 2020-11- 2021-09- 2021-05- IBRD / 85290 management in general Post Qualification Open - National 15,312.70 Signed 2020-11-09 reconstruction and capital 21 30 13 23 12 09 19 10 15 12 secondary education Selection repairs of GSE facilities in Brest Oblast BEMP/AF/2.5/8-1 / Procurement of consulting services on activities Modernization of system Consultant 2020-04- 2020-06- 2020-07- 2020-08- 2020-10- 2021-04- organization of educational IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2020-05-27 30 17 31 30 04 02 institution as a socio-cultural secondary education Selection center for work with family and society BEMP/AF/1.1/11 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2021-03- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-09- IBRD / 89430 Post Open - National 0.00 Canceled 2021-03-02 reconstruction and capital receiving students from Based Selection 23 06 03 03 07 11 11 repairs of GSEIs (Grodno closed/reorganized schools region) BEMP/AF/1.3/3 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- 2021-03- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-09- IBRD / 89430 Post Open - National 0.00 Canceled 2021-03-03 reconstruction and capital receiving students from Based Selection 24 07 04 04 08 12 12 repairs of GSEIs (Vitebsk closed/reorganized schools region) BEMP/AF/QCBS/1.1/13 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2020-10- 2020-11- 2021-01- 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- 2021-04- 2021-04- 2021-05- 2022-05- IBRD / 89430 Post Open - National 0.00 2020-11-05 reconstruction and capital receiving students from Based Selection Implementation 28 26 09 15 06 15 08 16 12 28 17 17 repairs of GSEIs (Gomel closed/reorganized schools region, 6 objects) BEMP/CQS/1.1/74 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-11- 2020-11- 2021-01- 2020-12- 2021-02- 2020-12- 2021-03- 2021-01- 2021-09- IBRD / 85290 Post Qualification Open - National 10,218.94 Signed 2020-11-05 reconstruction and capital receiving students from 05 26 09 14 08 30 15 18 11 Selection repairs of GSE facilities in closed/reorganized schools Gomel Oblast BEMP/3/53 / Consulting Consultant services for performing the Project implementation 2020-07- 2020-12- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-09- 2020-12- IBRD / 85290 Post Qualification Open - National 173.28 Completed 2020-11-11 functions of technical support 21 02 15 17 14 22 21 22 17 04 Selection supervision of current repairs BEMP/CQS/1.1/76 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-11- 2020-12- 2021-02- 2020-12- 2021-03- 2020-12- 2021-04- 2021-01- 2021-07- IBRD / 85290 Post Qualification Open - National 9,625.60 Signed 2020-11-27 reconstruction and capital receiving students from 11 18 16 16 18 29 29 25 28 Selection repairs of GSE facilitiy in closed/reorganized schools Mogilev Oblast (Slavgorod) BEMP/CQS/1.1/77 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2020-11- 2020-12- 2021-02- 2020-12- 2021-03- 2020-12- 2021-04- 2021-01- 2021-10- IBRD / 85290 Post Qualification Open - National 2,512.44 Signed 2020-12-02 reconstruction and capital receiving students from 11 23 05 08 07 29 11 15 08 Selection repairs of GSE facilitiy in closed/reorganized schools Mogilev Oblast (Lopatichi) BEMP/CQS/1.1/81 / Integrated management and Modernization of system Consultant technical supervision of the 2021-01- 2021-01- 2021-03- 2021-02- 2021-04- 2021-03- 2021-05- 2021-03- 2021-11- IBRD / 85290 management in general Post Qualification Open - National 5,870.00 Signed 2020-12-30 reconstruction and capital 12 20 05 03 04 01 09 10 05 secondary education Selection repairs of GSE facilities in Brest Oblast BEMP/AF/1.5/4 / Organizing and conducting an assessment of the quality of Modernization of system Consultant 2021-02- 2021-02- 2021-03- 2021-04- 2021-06- 2021-12- the educational environment IBRD / 89430 management in general Post Qualification Open - National 0.00 Canceled 2021-01-18 25 08 31 30 04 01 in institutions of general secondary education Selection secondary education participating in the Project. BEMP/3/53-1 / Consulting Consultant services for performing the Project implementation 2021-02- 2021-02- 2021-02- 2021-04- 2021-03- 2021-05- 2021-03- 2021-06- 2021-03- 2021-12- IBRD / 85290 Post Qualification Open - National 614.45 Signed 2021-02-01 functions of technical support 01 22 02 07 17 07 17 11 03 08 Selection supervision of current repairs BEMP/AF/QCBS/1.1/14 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-02- 2021-03- 2021-05- 2021-03- 2021-06- 2021-04- 2021-09- 2021-10- 2021-12- 2022-05- IBRD / 89430 Post Open - National 0.00 2021-02-15 reconstruction and capital receiving students from Based Selection Implementation 05 17 16 26 30 26 18 22 09 18 repairs of GSEIs (Minsk closed/reorganized schools region, 8 objects) BEMP/AF/CQS/1.1/3 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools 2021-02- 2021-03- 2021-05- 2021-03- 2021-06- 2021-04- 2021-07- 2021-04- 2021-11- IBRD / 89430 Post Qualification Open - National 2,512.80 Signed 2021-02-10 reconstruction and capital receiving students from 03 12 11 12 10 07 22 07 19 Selection repairs of GSE facilities in closed/reorganized schools Minsk Oblast (Pogost) BEMP/AF/CQS/1.1/2 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools 2021-02- 2021-03- 2021-05- 2021-03- 2021-06- 2021-04- 2021-07- 2021-04- 2022-02- reconstruction and capital IBRD / 89430 Post Qualification Open - National 17,172.21 Signed 2021-02-09 receiving students from 03 11 10 22 09 08 21 20 16 repairs of GSE facilities in Selection closed/reorganized schools Gomel Oblast (Glazovka, Oktiabskiy, Svetilovichi) BEMP/AF/QCBS/1.1/15 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-02- 2021-03- 2021-05- 2021-04- 2021-07- 2021-05- 2021-09- 2021-11- 2021-12- 2022-05- IBRD / 89430 Post Open - National 0.00 2021-02-25 reconstruction and capital receiving students from Based Selection Implementation 05 27 26 12 10 27 28 01 19 28 repairs of GSEIs (Brest region, closed/reorganized schools 8 objects) BEMP/LCS/3/54 / Financial Project implementation Least Cost 2021-02- 2021-03- 2021-04- 2021-02- 2021-05- 2021-03- 2021-06- 2021-03- 2021-07- 2021-03- 2021-08- 2021-04- 2022-02- 2021-05- IBRD / 85290 Post Open - National 3,599.10 Completed 2021-02-14 audit of the project – 2020 support Selection 10 07 20 25 18 19 17 22 22 23 26 08 22 15 BEMP/CQS/1.1/83 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools Under 2021-02- 2021-03- 2021-05- 2021-03- 2021-06- 2021-05- 2021-08- 2022-03- reconstruction and capital IBRD / 85290 Post Qualification Open - National 0.00 2021-02-26 receiving students from Implementation 18 19 18 22 17 20 05 13 repairs of GSE facilities in Selection closed/reorganized schools Brest Oblast (Nacha, Perkovichi) BEMP/AF/1.1/12 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-03- 2021-04- 2021-06- 2021-05- 2021-07- 2021-06- 2021-09- 2021-10- 2021-11- 2022-11- IBRD / 89430 Post Open - National 0.00 2021-04-05 reconstruction and capital receiving students from Based Selection Implementation 15 26 09 21 07 21 05 10 14 14 repairs of GSEIs (Minsk closed/reorganized schools Region) BEMP/AF/CQS/1.1/4 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools Under 2021-03- 2021-04- 2021-06- 2021-04- 2021-07- 2021-05- 2021-08- 2021-11- IBRD / 89430 Post Qualification Open - National 0.00 2021-03-16 reconstruction and capital receiving students from Implementation 09 06 05 26 05 19 23 01 Selection repairs of GSE facilities in closed/reorganized schools Minsk Oblast (Bokshitsy) Page 8 BEMP/AF/2.5/1-6-1 / Rendering consulting services for the development of scientific and methodological Modernization of system Consultant support of the educational Under 2021-03- 2021-04- 2021-05- 2021-05- 2021-06- 2021-07- 2022-01- IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-03-12 programme for advanced Implementation 11 11 25 20 24 29 25 secondary education Selection training of heads of general secondary education institutions “Education quality management BEMP/AF/1.5./4 / Organizing and conducting an assessment of the quality of Modernization of system Consultant 2021-03- 2021-03- 2021-05- 2021-04- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- the educational environment IBRD / 89430 management in general Post Qualification Open - National 38,000.00 Signed 2021-03-04 04 25 08 20 07 06 12 14 08 in institutions of general secondary education Selection secondary education participating in the Project. BEMP/AF/QCBS/1.1/16 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-04- 2021-05- 2021-07- 2021-09- 2021-12- 2022-01- 2022-03- 2022-03- IBRD / 89430 Post Open - National 0.00 2021-04-30 reconstruction and capital receiving students from Based Selection Implementation 21 30 29 12 01 05 02 22 repairs of GSEIs (Minsk closed/reorganized schools region, 5 objects) BEMP/AF/2.5/1-1-1 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 16 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “Management system modernization of general secondary educat BEMP/AF/2.5/1-2-2 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 19 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “Using combined complexes of physics, chemistry, biology and BEMP/AF/2.5/1-3-3 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 19 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “New approaches to the education quality assessment”; BEMP/AF/2.5/1-4-4 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 19 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “Improving the educational environment of educational instit BEMP/AF/2.5/1-5-5 / Rendering consulting services for the development of scientific and methodological support of the educational Modernization of system Consultant Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- programme for advanced IBRD / 89430 management in general Post Qualification Open - National 0.00 2021-04-22 Implementation 19 13 22 03 02 22 21 training of heads of general secondary education Selection secondary education institutions “Organization of educational institutions activities as soci BEMP/AF/QCBS/1.1/17 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-04- 2021-06- 2021-08- 2021-09- 2021-12- 2022-01- 2022-03- 2022-10- IBRD / 89430 Post Open - National 0.00 2021-05-14 reconstruction and capital receiving students from Based Selection Implementation 28 13 12 26 15 19 16 02 repairs of GSEIs (Minsk closed/reorganized schools region, 5 objects, Starye dorogi) BEMP/AF/QCBS/1.1/18 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-04- 2021-06- 2021-08- 2021-09- 2021-12- 2022-01- 2022-03- 2022-04- IBRD / 89430 Post Open - National 0.00 2021-05-14 reconstruction and capital receiving students from Based Selection Implementation 29 13 12 26 15 19 16 05 repairs of GSEIs (Gomel closed/reorganized schools region, 5 objects) BEMP/CQS/1.1/88 / Integrated management and Ensuring a quality learning technical supervision of the Consultant environment in schools Under 2021-05- 2021-05- 2021-07- 2021-08- 2021-10- 2022-05- reconstruction and capital IBRD / 85290 Post Qualification Open - National 0.00 2021-05-10 receiving students from Implementation 07 31 30 29 17 25 repairs of GSE facilities in Selection closed/reorganized schools Brest Oblast (Bostun, Mikashevichi, Kroshin, Mir) BEMP/CQS/1.1/90 / Integrated management and Ensuring a quality learning Consultant technical supervision of the environment in schools Under 2021-05- 2021-06- 2021-08- 2021-09- 2021-10- 2022-06- IBRD / 85290 Post Qualification Open - National 0.00 2021-05-18 reconstruction and capital receiving students from Implementation 27 08 07 06 25 02 Selection repairs of GSE facilities in closed/reorganized schools Brest Oblast (Kossovo) BEMP/AF/QCBS/1.1/19 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-04- 2021-06- 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-12- IBRD / 89430 Post Open - National 0.00 2021-06-04 reconstruction and capital receiving students from Based Selection Implementation 27 25 08 05 05 09 14 14 repairs of GSEIs (Gomel closed/reorganized schools region, 6 objects) BEMP/AF/QCBS/1.1/20 / Development of construction Ensuring a quality learning design documentation for environment in schools Quality And Cost- Under 2021-05- 2021-06- 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-12- IBRD / 89430 Post Open - National 0.00 2021-06-04 reconstruction and capital receiving students from Based Selection Implementation 31 25 08 05 05 09 14 14 repairs of GSEIs (Brest region, closed/reorganized schools 7 objects) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Actual Amount Draft Negotiated Description Component Review Type Method Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. Approach (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEMP/AF/2.2/19-14 / Procurement of services Modernization of system Individual 2020-04- 2020-05- 2020-06- 2020-12- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2020-04-22 27 18 22 19 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/8-1 / Payment Modernization of system Individual for services of consultants - 2019-12- 2021-02- 2020-01- 2021-03- 2020-02- 2021-04- 2020-03- 2021-10- 2020-06- IBRD / 89430 management in general Post Consultant Limited 334.12 Completed 2021-02-19 coordinators involved into 26 24 29 17 28 21 03 18 25 secondary education Selection PISA-2021 testing BEMP/AF/2.2/8-29 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 245.23 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing Page 9 BEMP/AF/2.2/8-28 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 245.23 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-27 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 245.23 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-26 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 357.45 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-24 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 256.97 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-22 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 469.29 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-21 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 458.09 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-23 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 357.45 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-20 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 469.29 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-19 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 256.67 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-18 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 469.29 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-17 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 256.97 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-16 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 460.44 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-15 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 470.88 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-14 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 190.32 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-13 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 179.89 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-12 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 191.38 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-11 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 191.38 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-9 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 300.45 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-8 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 300.45 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-7 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 167.06 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-6 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 176.97 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-5 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 200.10 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-4 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 189.09 Completed 2020-02-19 26 24 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-3 / Procurement of consulting Modernization of system Individual 2019-12- 2020-02- 2020-01- 2020-03- 2020-04- 2020-03- 2020-10- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 255.78 Completed 2020-02-19 26 24 29 16 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-10 / Procurement of consulting Modernization of system Individual 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-09- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 370.21 Completed 2020-01-13 26 18 29 08 28 14 03 10 25 for conducting PISA-2021 secondary education Selection testing Page 10 BEMP/AF/2.2/8-2 / Procurement of consulting Modernization of system Individual 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-09- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 389.17 Completed 2020-01-13 26 18 29 08 28 14 03 10 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-30 / Procurement of consulting Modernization of system Individual 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-09- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 245.23 Completed 2020-01-13 26 18 29 08 28 14 03 10 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-25 / Procurement of consulting Modernization of system Individual 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-09- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Limited 391.05 Completed 2020-01-13 26 18 29 08 28 14 03 10 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-31 / Procurement of consulting Modernization of system Individual 2019-12- 2020-04- 2020-01- 2020-05- 2020-02- 2020-06- 2020-03- 2020-12- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 311.38 Completed 2020-04-15 26 25 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/AF/2.2/8-32 / Procurement of consulting Modernization of system Individual 2019-12- 2020-04- 2020-01- 2020-05- 2020-02- 2020-06- 2020-03- 2020-12- 2020-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 356.55 Completed 2020-04-15 26 25 29 16 28 20 03 17 25 for conducting PISA-2021 secondary education Selection testing BEMP/3/51 / Individual consultant on adjustment of the procurement strategy, procurement plan and on Individual preparation of the Project Project implementation 2020-03- 2020-06- 2020-03- 2020-06- 2020-04- 2020-08- 2020-04- 2021-01- 2020-12- IBRD / 85290 Post Consultant Direct 2,656.55 Completed 2020-05-29 Operating Manual of the support 16 08 31 29 04 03 04 30 31 Selection “Belarus Higher Education Modernization Project” within the framework of the “Belarus Education Modernization Proje BEMP/AF/2.4/4 / Procurement of consultants for pre-project survey, TOR preparation and system modules development. Pre- Modernization of system Individual 2020-04- 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2021-03- school education. Consulting IBRD / 89430 management in general Post Consultant Open 8,104.20 Signed 2020-06-16 07 04 31 25 01 29 02 28 services "Analytics of business secondary education Selection processes of collecting, processing and analyzing data from pre-school educational institu BEMP/AF/2.4/5 / Procurement of consultants for pre-project survey, TOR preparation and system modules development. Modernization of system Individual Vocational and secondary 2020-04- 2020-08- 2020-07- 2020-08- 2020-07- 2020-09- 2020-07- 2021-03- IBRD / 89430 management in general Post Consultant Open 4,904.46 Signed 2020-06-16 special education. 07 04 07 25 10 29 10 28 secondary education Selection Consulting services "Analytics of business processes of collecting, processing and analyzing data from vocation BEMP/AF/2.4/6 / Procurement of consultants for pre-project survey, TOR preparation and system modules development. Higher Modernization of system Individual 2020-09- 2020-08- 2020-10- 2020-08- 2020-10- 2020-09- 2020-11- 2021-03- and postgraduate education. IBRD / 89430 management in general Post Consultant Open 8,318.42 Signed 2020-06-16 24 04 14 25 16 29 04 28 Consulting services "Analytics secondary education Selection of business processes of collecting, processing and analyzing data from higher and postgra BEMP/AF/2.4/7 / Procurement of consultants to ensure the development of terms of reference for the creation of an education Modernization of system Individual 2020-04- 2020-08- 2020-09- 2020-08- 2020-09- 2020-09- 2020-09- 2021-03- management information IBRD / 89430 management in general Post Consultant Open 4,718.60 Signed 2020-06-16 07 04 01 25 03 29 03 28 system. Consulting services secondary education Selection "Technical Consultant. Analytics of business processes of collecting, processing and analyzing BEMP/3/44 / development of a framework document for Individual environmental protection of Project implementation 2019-05- 2020-08- 2019-06- 2020-09- 2019-06- 2020-10- 2019-06- 2021-04- 2020-04- IBRD / 85290 Post Consultant Open 1,260.89 Completed 2020-06-23 the project Modernization of support 26 11 14 01 14 06 14 04 15 Selection Higher Education of the Republic of Belarus BEMP/AF/1.5/1 / adaptation Ensuring a quality learning Individual to the socio-cultural realities environment in schools 2020-06- 2020-12- 2020-09- 2020-12- 2020-09- 2021-01- 2020-09- 2021-07- IBRD / 89430 Post Consultant Open 1,782.74 Signed 2020-10-14 of the Russian translation of receiving students from 04 02 01 23 01 27 11 26 Selection the toolkit OCED closed/reorganized schools BEMP/1.5/2 / adaptation to Ensuring a quality learning Individual the socio-cultural realities of environment in schools 2020-06- 2020-12- 2020-09- 2020-12- 2020-09- 2021-01- 2020-09- 2021-07- IBRD / 89430 Post Consultant Open 667.36 Signed 2020-10-14 translation of the toolkit into receiving students from 04 02 01 23 01 27 11 26 Selection Belarusian closed/reorganized schools BEMP/AF/2.1/1 / Development of tools for the Modernization of system Individual 2020-10- 2020-12- 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-08- psychological examination of IBRD / 89430 management in general Post Consultant Open 4,101.14 Signed 2020-11-06 23 25 10 15 10 19 19 18 textbooks for institutions of secondary education Selection general secondary education BEMP/AF/2.1/2 / Development of a matrix for a Modernization of system Individual comprehensive assessment of 2020-10- 2021-01- 2021-02- 2021-01- 2021-02- 2021-03- 2021-03- 2021-08- IBRD / 89430 management in general Post Consultant Open 20,785.36 Signed 2020-11-19 teaching aids for institutions 23 07 10 28 15 04 01 31 secondary education Selection of general secondary education BEMP/AF/2.3/2-2 / Substantive multi-component analysis of the official results Modernization of system Individual 2020-06- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-09- of the PISA study in Belarus, IBRD / 89430 management in general Post Consultant Open 3,420.41 Signed 2020-12-01 04 19 01 09 07 16 11 12 conducted in 2018, and secondary education Selection preparation based on the analysis of the report BEMP/AF/2.3/2-3 / Substantive multi-component analysis of the official results Modernization of system Individual 2020-06- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-09- of the PISA study in Belarus, IBRD / 89430 management in general Post Consultant Open 3,990.49 Signed 2020-12-01 04 19 01 09 04 16 11 12 conducted in 2018, and secondary education Selection preparation based on the analysis of the report BEMP/AF/2.3/2-4 / Substantive multi-component analysis of the official results Modernization of system Individual 2020-06- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-09- of the PISA study in Belarus, IBRD / 89430 management in general Post Consultant Open 3,383.81 Signed 2020-12-01 04 19 01 09 01 16 11 12 conducted in 2018, and secondary education Selection preparation based on the analysis of the report BEMP/AF/2.3/2-5 / Substantive multi-component analysis of the official results Modernization of system Individual 2020-06- 2021-01- 2020-09- 2021-02- 2020-09- 2021-03- 2020-10- 2021-09- of the PISA study in Belarus, IBRD / 89430 management in general Post Consultant Open 3,383.81 Signed 2020-12-01 04 19 02 09 02 16 19 12 conducted in 2018, and secondary education Selection preparation based on the analysis of the report Page 11 BEMP/AF/2.3/2-1 / Substantive multi-component analysis of the official results Modernization of system 2020-06- 2020-12- 2020-10- 2021-02- 2020-10- 2021-08- of the PISA study in Belarus, IBRD / 89430 management in general Post Direct Selection Direct 21,330.92 Signed 2020-12-01 04 11 12 14 19 13 conducted in 2018, and secondary education preparation based on the analysis of the report BMP/AF/2.2/9-1 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-2 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-3 / Procurement of services Modernization of system Individual 2021-04- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 23 07 12 10 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-4 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-5 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-6 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-7 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-09- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 09 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-8 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-9 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-10 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-11 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-12 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/9-13 / Procurement of services Modernization of system Individual 2021-05- 2021-06- 2021-08- 2021-11- coding consultants to verify IBRD / 89430 management in general Post Consultant Limited 0.00 Canceled 2021-04-21 12 26 31 29 the work of participants secondary education Selection testing PISA-2021 BEMP/AF/2.2/10-2 / Procurement of consulting Modernization of system Individual 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 776.28 Completed 2021-01-18 20 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-3 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 779.15 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-4 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 779.15 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-5 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 636.87 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-6 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 426.85 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-7 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 636.87 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-8 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 494.59 Completed 2021-01-18 02 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-9 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 745.28 Completed 2021-01-18 02 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-10 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 636.87 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-11 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 603.00 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing Page 12 BEMP/AF/2.2/10-12 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 352.30 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-13 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 567.16 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-14 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 494.59 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-15 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 142.28 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-16 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 567.16 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-17 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-18 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 962.14 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-19 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-20 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-21 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-22 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 928.24 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-23 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 853.70 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-24 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 962.10 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-25 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 962.10 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-26 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 785.97 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-27 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 887.58 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-28 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 785.97 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-29 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 392.98 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-30 / Procurement of consulting Modernization of system Individual 2021-02- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 359.11 Completed 2021-01-18 01 28 05 18 25 25 19 21 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/1.5/3 / Organizing and conducting an assessment of the quality of Modernization of system Individual 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- 2021-09- the educational environment IBRD / 89430 management in general Post Consultant Direct 21,305.28 Signed 2021-01-18 20 01 15 22 11 29 21 25 in institutions of general secondary education Selection secondary education participating in the Project. BEMP/AF/2.2/10-1 / Procurement of consulting Modernization of system Individual 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-09- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant 819.83 Completed 2021-01-20 20 30 05 20 25 27 19 23 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-31 / Procurement of consulting Modernization of system Individual 2021-02- 2021-03- 2021-03- 2021-05- 2021-11- services of test-administrator IBRD / 89430 management in general Post Consultant Open 0.00 Canceled 2021-01-20 01 10 31 05 01 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2./10-32 / Procurement of consulting Modernization of system Individual 2021-02- 2021-03- 2021-03- 2021-05- 2021-11- services of test-administrator IBRD / 89430 management in general Post Consultant Open 0.00 Canceled 2021-01-20 04 10 31 05 01 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.2/10-32 / Procurement of consulting Modernization of system Individual 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-04- 2021-02- 2021-10- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 392.98 Completed 2021-02-07 02 17 05 10 25 14 19 11 11 for conducting PISA-2022 secondary education Selection testing Page 13 BEMP/AF/2.2/10-31. / Procurement of consulting Modernization of system Individual 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-04- 2021-02- 2021-10- 2021-06- services of test-administrator IBRD / 89430 management in general Post Consultant Direct 392.98 Completed 2021-02-07 02 17 05 10 25 14 19 11 11 for conducting PISA-2022 secondary education Selection testing BEMP/AF/2.3/4 / Development of recommendations on the Modernization of system Individual 2021-03- 2021-05- 2021-06- 2021-07- 2022-01- formation of an educational IBRD / 89430 management in general Post Consultant Open 0.00 Canceled 2021-03-15 16 28 18 23 19 policy in the Republic of secondary education Selection Belarus based on the results of the PISA study BEMP/AF/2.4/8 / Providing consulting services in the Modernization of system Individual process of pre-project survey Under 2021-04- 2021-05- 2021-06- 2021-07- 2022-01- IBRD / 89430 management in general Post Consultant Open 0.00 2021-03-15 of the current state of the Implementation 29 14 04 09 05 secondary education Selection system for collecting and analyzing labor market data BEMP/AF/2.2/11-1 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 1,842.68 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-2 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 762.49 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-3 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 762.49 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-4 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 1,429.42 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-5 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 1,429.42 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-6 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 740.23 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-7 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 740.23 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-8 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 740.23 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-9 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 740.23 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-10 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-11 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-12 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-13 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-14 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-15 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 867.86 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.2/11-16 / Procurement of services Modernization of system Individual 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-05- 2022-01- coding consultants to verify IBRD / 89430 management in general Post Consultant Direct 1,084.83 Signed 2021-04-20 12 18 07 08 07 13 12 09 the work of participants secondary education Selection testing PISA-2022 BEMP/AF/2.3/4-1 / consulting services of an expert with relevant international experience in Modernization of system Individual order to develop Under 2021-06- 2021-06- 2021-06- 2021-07- 2021-08- 2022-02- IBRD / 89430 management in general Post Consultant Direct 0.00 2021-05-31 recommendations for the Implementation 08 17 10 08 12 08 secondary education Selection development of educational policy in the Republic of Belarus based on the results of the PISA-2018 study BEMP/AF/2.3/4-2 / consulting services of an expert with relevant national experience in order to Modernization of system Individual Under 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- 2022-02- develop recommendations for IBRD / 89430 management in general Post Consultant Direct 0.00 2021-05-31 Implementation 31 17 10 08 12 08 the development of secondary education Selection educational policy in the Republic of Belarus based on the results of the PISA-2018 study Page 14 PROCUREMENT PLAN (Textual Part) Project information: Liberia Recovery of Economic Activity for Liberian Informal Sector Employment Project (P174417). Project Implementation agency: Ministry of Youth and Sports (MYS) and Liberia Agency for Community Empowerment (LACE). Date of the Procurement Plan: March 12, 2021. Period covered by this Procurement Plan: March 12, 2021-June 30, 2024. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018 and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable. Works: Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable. Other Relevant Procurement Information. The project may use the CDD procurement under this project. If required, CDD procurement manual will be produced by the project. PROCUREMENT Liberia : Recovery of Economic Activity for Liberian Informal Sector Employment Project PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2021-05-27 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174417 GPN Date: Project Name: Recovery of Economic Activity for Liberian Informal Sector Employment Project Loan / Credit No: IDA / 68480 Ministry of Youth and Sport Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-236717-GO-RFB / Temporary Employment Tools and Equipment Pending Support and Employability Single Stage - One (Wheelbarrows, Shovel, IDA / 68480 Post Request for Bids Open - National 727,250.00 0.00 Implementati 2021-08-16 2021-08-21 2021-10-02 2021-11-01 2021-12-06 2021-12-31 Development for Vulnerable Envelope Protective equipment, Paint, on Workers Brushes etc.) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity Building and Project Consultant LR-MOYS-236791-CS-CQS / Pending IDA / 68480 Implementation and Post Qualification Open - National 30,000.00 0.00 2021-06-21 2021-07-12 2021-08-25 2021-09-24 2021-10-29 2022-04-27 Third Party Monitoring Implementation Coordination Selection Capacity Building and Project Consultant LR-MOYS-236720-CS-CQS / Pending IDA / 68480 Implementation and Post Qualification Open - National 30,000.00 0.00 2022-06-30 2022-07-21 2022-09-03 2022-10-03 2022-11-07 2023-05-06 Annual Beneficiary Survey Implementation Coordination Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity Building and Project LR-MOYS-234637-CS-CDS / Under IDA / 68480 Implementation and Post Direct Selection Direct 74,523.24 0.00 2021-06-01 2021-05-31 2021-06-11 2021-08-15 2022-12-31 Project Coordinator Implementation Coordination Capacity Building and Project Individual LR-MOYS-234635-CS-INDV Under IDA / 68480 Implementation and Post Consultant Open 33,000.00 0.00 2021-06-01 2021-05-31 2021-07-20 2021-08-10 2021-09-14 2022-12-31 / Environmental Officer Implementation Coordination Selection LR-MOYS-234642-CS-INDV Capacity Building and Project Individual Under / Monitoring and Evaluation IDA / 68480 Implementation and Post Consultant Open 33,000.00 0.00 2021-06-01 2021-05-30 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Implementation Officer Coordination Selection Capacity Building and Project LR-MOYS-236709-CS-CDS / Under IDA / 68480 Implementation and Prior Direct Selection Direct 36,000.00 0.00 2021-06-01 2021-05-31 2021-06-11 2021-08-15 2022-12-31 Procurement Officer Implementation Coordination LR-MOYS-236721-CS-INDV Capacity Building and Project Individual Under / Public Works And IDA / 68480 Implementation and Post Consultant Open 36,000.00 0.00 2021-06-01 2021-05-30 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Implementation Employability Officer Coordination Selection Page 1 Procurement Plan Nepal Livestock Sector Innovation Project I. General 1. Bank’s approval Date of the procurement Plan: February 14, 2018 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 2,000,000 All 2. NCB (Goods) Above US$ 2,000,000 All 3. ICB (Works) Above US$ All 10,000,000 4. NCB (Works) Above US$ All 10,000,000 5. (Non-Consultant Services) Above US$ 2,000,000 All [Add other methods if necessary] 2. Prequalification. Bidders for _None_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Description Estimate Packag Domesti Review Comme No. d es c by Bank nts Cost Prefere (Prior / US$ nce Post) (yes/no) Summary of the ICB - - - - (Works) February 14, 2018 Summary of the NCB 2,000,000 6 - (Works) 1 NP-MOLD-40932-CW-RFB 500,000 1 - Post Building Construction 2 NP-MOLD-41445-CW-RFB 200,000 1 - Post Construction of Training Center 1 3 NP-MOLD-41446-CW-RFB 200,000 1 - Post Construction of Training Center 2 4 NP-MOLD-45607-CW-RFB 250,000 1 - Post Construction of Goat Breeding Center at Pokhara 5 NP-MOLD-405595-CW-RFB 450,000 1 - Post Construction of Frozen Semen Facility for Eastern Region 6 NP-MOLD-45591-CW-RFB 400,000 1 - Post Construction of Livestock Breeding Center at Pokhara Summary of the ICB - - - - (Goods) Summary of the NCB - - - - (Goods) Summary of the ICB (Non- - - - - Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1,000,000 2. Single Source (Firms) Above US$ 1,000,000 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable 4. Consultancy Assignments with Selection Methods and Time Schedule February 14, 2018 1 2 3 4 5 6 Ref. Description of Estimat Packag Review Comme No. Assignment ed es by Bank nts Cost (Prior / US$ Post) million Summary of 0.846 2 Post number of contracts that will be let under QCBS Summary of 0.028 2 Post CQS number of contracts that will be let under other methods February 14, 2018 PROCUREMENT Nepal : Nepal Livestock Sector Innovation Project PLAN General Information Country: Nepal Bank’s Approval Date of the Original Procurement Plan: 2018-02-15 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156797 GPN Date: 2018-08-09 Project Name: Nepal Livestock Sector Innovation Project Loan / Credit No: IDA / V0290, IDA / 61490 M Executing Agency(ies): inistry of Livestock Development WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NP-MOLD-100003-CW-RFQ / Construction of two biological pits in quarantine Component B: Promoting Request for Single Stage - One 2019-07- office (Biratnagar, IDA / 61490 sector innovation and Post Open - National 36,400.00 25,298.84 Completed 2019-03-22 2019-05-17 2019-05-28 Quotations Envelope 16 Kakarbhitta), under modernizing service delivery supervision of DLSU Biratnagar. NP-MOLD-100004-CW-RFQ / Construction of two Component B: Promoting biological pits in quarantine Request for Single Stage - One 2019-07- IDA / 61490 sector innovation and Post Open - National 36,400.00 15,915.05 Completed 2019-03-22 2019-05-17 2019-04-26 office (Janakpur, Kathmandu), Quotations Envelope 16 modernizing service delivery under supervision of DLSU Hetauda. NP-MOLD-100005-CW-RFQ / Construction of three Component B: Promoting Under biological pits in quarantine Request for Single Stage - One 2019-07- IDA / 61490 sector innovation and Post Open - National 55,000.00 0.00 Implementat 2019-03-22 2019-05-17 office (Bhairahawa, Nepalgunj, Quotations Envelope 16 modernizing service delivery ion Gaddachauki), under supervision of DLSU Butwal. NP-MOLD-40953-CW-RFB / Construction of two biological Component B: Promoting Single Stage - One 2019-11- pits in quarantine office IDA / V0290 sector innovation and Post Request for Bids Open - National 36,400.00 0.00 Canceled 2019-01-20 2019-01-25 2019-03-08 2019-04-07 2019-05-12 Envelope 08 (Janakpur, Kathmandu), under modernizing service delivery supervision of DLSU Hetauda. NP-MOLD-72188-CW-RFB / Construction of three Component B: Promoting biological pits in quarantine Single Stage - One 2019-11- IDA / V0290 sector innovation and Post Request for Bids Open - National 55,000.00 0.00 Canceled 2019-01-20 2019-01-25 2019-03-08 2019-04-07 2019-05-12 office (Bhairahawa, Nepalgunj, Envelope 08 modernizing service delivery Gaddachauki), under supervision of DLSU Butwal. NP-MOLD-41444-CW-RFB / Construction of two biological Component B: Promoting pits in quarantine office Single Stage - One 2019-11- IDA / 61490 sector innovation and Post Request for Bids Open - National 36,400.00 0.00 Canceled 2019-01-20 2019-01-25 2019-03-08 2019-04-07 2019-05-12 (Biratnagar, Kakarbhitta), Envelope 08 modernizing service delivery under supervision of DLSU Biratnagar. NP-MOLD-83561-CW-RFB / Component B: Promoting Single Stage - One 2020-06- Construction of veterinary IDA / 61490 sector innovation and Post Request for Bids Open - National 300,000.00 0.00 Canceled 2019-02-15 2019-02-20 2019-04-03 2019-05-03 2019-06-07 Envelope 06 laboratories modernizing service delivery NP-MOLD-50338-CW-RFB / Component B: Promoting Construction and Single Stage - One 2021-01- IDA / 61490 sector innovation and Post Request for Bids Open - National 182,000.00 0.00 Canceled 2019-10-01 2019-10-06 2019-11-17 2019-12-17 2020-01-21 strengthening of quarantine Envelope 20 modernizing service delivery office NP-MOLD-71907-CW-RFB / Construction of infrastructure Component B: Promoting Request for Single Stage - One 2020-06- for improvement of central IDA / 61490 sector innovation and Post Open - National 10,000.00 0.00 Canceled 2019-11-02 2019-12-28 Quotations Envelope 25 Information Communication modernizing service delivery Technology Center NP-MOLD-45591-CW-RFB / Component B: Promoting Single Stage - Two 2021-03- Construction of livestock IDA / 61490 sector innovation and Post Request for Bids Open - National 400,000.00 0.00 Canceled 2019-10-01 2019-10-06 2019-11-17 2020-01-30 2020-03-05 Envelope 05 breeding center at Pokhara modernizing service delivery NP-MOLD-45595-CW-RFB / Component B: Promoting Single Stage - Two 2020-09- Construction of frozen semen IDA / 61490 sector innovation and Post Request for Bids Open - National 450,000.00 0.00 Canceled 2019-10-01 2019-10-06 2019-11-17 2020-01-30 2020-03-05 Envelope 01 facility for State 1. modernizing service delivery NP-MOLD-45609-CW-RFB / Component B: Promoting Single Stage - One 2020-07- Construction of frozen semen IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 0.00 Canceled 2019-10-01 2019-10-06 2019-11-17 2019-12-17 2020-01-21 Envelope 19 facility for goats modernizing service delivery NP-MOLD-45605-CW-RFB / Component B: Promoting Single Stage - One 2020-07- Construction of quarantine IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 0.00 Canceled 2019-10-01 2019-10-06 2019-11-17 2019-12-17 2020-01-21 Envelope 19 check post modernizing service delivery NP-MOLD-45607-CW-RFB / Component B: Promoting Single Stage - Two 2020-09- Construction of goat breeding IDA / 61490 sector innovation and Post Request for Bids Open - National 250,000.00 0.00 Canceled 2019-10-01 2019-10-06 2019-11-17 2020-01-30 2020-03-05 Envelope 01 center at Pokhara modernizing service delivery NP-MOLD-41446-CW-RFB / Component B: Promoting Single Stage - Two 2020-09- Construction of Training IDA / 61490 sector innovation and Post Request for Bids Open - National 200,000.00 0.00 Canceled 2019-10-06 2019-10-11 2019-11-22 2020-02-04 2020-03-10 Envelope 06 Center in State 6. modernizing service delivery NP-MOLD-41445-CW-RFB / Component B: Promoting Single Stage - Two 2020-09- Construction of Training IDA / 61490 sector innovation and Post Request for Bids Open - National 200,000.00 0.00 Canceled 2019-10-20 2019-10-25 2019-12-06 2020-02-18 2020-03-24 Envelope 20 Center in State 3 modernizing service delivery NP-MOLD-45603-CW-RFB / Component B: Promoting Single Stage - One 2020-07- Construction of quarantine IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 0.00 Canceled 2019-10-01 2019-10-06 2019-11-17 2019-12-17 2020-01-21 Envelope 19 check post modernizing service delivery Page 1 NP-MOLD-71904-CW-RFB / Component C: Promoting Construction of incomplete Smallholder Inclusive Value Single Stage - Two 2021-06- livestock market in IDA / 61490 Post Request for Bids Open - National 455,000.00 0.00 Canceled 2019-01-28 2019-02-02 2019-03-09 2019-05-17 2019-06-21 Chains for Selected Livestock Envelope 20 Damak/Construction of Commodities Livestock model market NP-MOLD-71563-CW-RFQ / Component B: Promoting Under Construction of fence in Request for Single Stage - One 2019-08- IDA / 61490 sector innovation and Post Open - National 18,000.00 0.00 Implementat 2019-03-29 2019-05-13 Chyangra resource centre, Quotations Envelope 11 modernizing service delivery ion Mustang NP-MOLD-71133-CW-RFB / Construction of modern Component B: Promoting Single Stage - One 2020-09- forage storage unit and forage IDA / 61490 sector innovation and Post Request for Bids Open - National 269,000.00 263,971.09 Signed 2019-06-10 2019-05-22 2019-06-15 2019-05-28 2019-07-27 2019-06-21 2019-08-26 2019-06-28 2019-09-30 2019-07-14 Envelope 29 seed processing unit (2 modernizing service delivery numbers in 1 contract) NP-MOLD-40932-CW-RFB / Component B: Promoting Construction of Nepal Single Stage - One 2021-10- IDA / 61490 sector innovation and Post Request for Bids Open - National 609,100.00 311,745.93 Signed 2019-06-30 2019-05-22 2019-07-05 2019-05-28 2019-08-16 2019-06-21 2019-09-15 2019-07-01 2019-10-20 2019-07-14 Veterinary Council Office Envelope 09 modernizing service delivery Building NP-MOLD-71988-CW-RFB / Component B: Promoting Construction of Bull Mother Single Stage - One 2020-03- IDA / 61490 sector innovation and Post Request for Bids Open - National 89,000.00 81,017.69 Signed 2019-06-10 2019-05-22 2019-06-15 2019-05-28 2019-07-20 2019-06-21 2019-08-19 2019-07-01 2019-09-24 2019-07-22 Shed in National Livestock Envelope 22 modernizing service delivery Breeding Centre, Pokhara NP-MOLD-72187-CW-RFB / Component B: Promoting Construction of Livestock Single Stage - One 2020-09- IDA / 61490 sector innovation and Post Request for Bids Open - National 1,950,000.00 730,165.82 Signed 2019-06-02 2019-05-28 2019-06-07 2019-05-28 2019-07-19 2019-06-27 2019-08-18 2019-08-12 2019-09-22 2019-09-25 Service Center in 14 project Envelope 21 modernizing service delivery districts. (14 slices) NP-MOLD-115830-CW-RFB / Component B: Promoting Under Construction of 8 Livestock Single Stage - One 2021-01- IDA / 61490 sector innovation and Post Request for Bids Open - National 1,200,000.00 0.00 Implementat 2019-09-30 2019-08-22 2019-10-05 2019-08-25 2019-11-16 2019-09-24 2019-12-16 2020-01-20 Service Centre in 8 project Envelope 19 modernizing service delivery ion districts. (8 slices) NP-MOLD-71901-CW-RFB / Construction of infrastructure Component B: Promoting for upgrading to BSL2+ Single Stage - One 2021-11- IDA / 61490 sector innovation and Post Request for Bids Open - National 1,252,000.00 0.00 Canceled 2019-07-30 2019-05-27 2019-08-04 2019-05-28 2019-09-15 2019-06-26 2019-10-15 2019-11-19 Laboratory and Waste Water Envelope 08 modernizing service delivery Management Plant in National FMD & TADs Laboratory NP-MOLD-73387-CW-RFB / Construction of incomplete infrastructures in Gaughat farm (Breeding Center): Component B: Promoting Single Stage - Two 2020-05- i) Laboratory-1 IDA / 61490 sector innovation and Post Request for Bids Open - National 332,000.00 0.00 Canceled 2019-06-16 2019-06-21 2019-08-02 2019-10-15 2019-11-19 Envelope 17 ii) Office building-1 modernizing service delivery iii) Bull Shed-2 iv) Staff Quarters-3 (7 items in 1 contract) NP-MOLD-124127-CW-RFB / Component B: Promoting Single Stage - One 2020-06- Construction of Goat Shed at IDA / 61490 sector innovation and Post Request for Bids Open - National 90,910.00 77,444.54 Signed 2019-09-16 2019-09-11 2019-09-21 2019-09-15 2019-10-22 2019-10-15 2019-11-11 2019-11-21 2019-12-06 2019-12-12 Envelope 23 Goat Farm, Budhitola modernizing service delivery NP-MOLD-45596-CW-RFB / Component B: Promoting Single Stage - One 2021-02- Construction of quarantine IDA / 61490 sector innovation and Post Request for Bids Open - National 182,000.00 0.00 Canceled 2019-10-20 2019-10-25 2019-12-06 2020-01-05 2020-02-09 Envelope 08 office modernizing service delivery NP-MOLD-123396-CW-RFB / Component B: Promoting Construction of veterinary Single Stage - One 2021-06- IDA / 61490 sector innovation and Post Request for Bids Open - National 636,400.00 335,276.70 Signed 2019-10-11 2019-10-01 2019-10-14 2019-10-04 2019-11-14 2019-10-31 2019-11-29 2019-12-16 2019-12-24 2019-12-30 service training building in Envelope 16 modernizing service delivery Karnali State NP-MOLD-123414-CW-RFB / Component B: Promoting Single Stage - One 2020-07- Construction of Model Forage IDA / 61490 sector innovation and Post Request for Bids Open - National 46,000.00 35,114.36 Signed 2019-10-20 2019-11-08 2019-10-25 2019-11-11 2019-11-25 2019-12-10 2019-12-15 2020-01-08 2020-01-09 2020-01-28 Envelope 07 Training Unit at Sarlahi modernizing service delivery NP-MOLD-124126-CW-RFB / Component B: Promoting Construction of Compound Single Stage - One 2020-05- IDA / 61490 sector innovation and Post Request for Bids Open - National 90,910.00 54,591.87 Signed 2019-09-22 2019-09-11 2019-09-27 2019-09-15 2019-10-28 2019-10-15 2019-11-12 2019-11-21 2019-12-07 2019-12-17 wall and fencing for rotational Envelope 05 modernizing service delivery grazing at Goat Farm, Chitlang NP-MOLD-125344-CW-RFB / Construction of Livestock Component B: Promoting Single Stage - One 2021-07- Market-4 Slices (Tanahu, IDA / 61490 sector innovation and Post Request for Bids Open - National 1,818,200.00 326,726.51 Signed 2019-11-15 2019-11-26 2019-11-20 2019-11-27 2019-11-23 2019-12-27 2019-12-13 2020-01-28 2020-01-11 2020-02-23 Envelope 04 Kapilvastu, Chitwan and State modernizing service delivery 7) NP-MOLD-129860-CW-RFB / Component B: Promoting Construction of BSL2+ Single Stage - One 2021-06- IDA / 61490 sector innovation and Post Request for Bids Open - National 1,400,000.00 0.00 Canceled 2019-09-16 2020-01-08 2019-09-21 2020-01-08 2019-11-02 2020-02-09 2019-12-02 2020-01-06 Laboratory at National FMD & Envelope 29 modernizing service delivery TADs Laboratory. NP-MOLD-71991-CW-RFB / Construction of infrastructure Component B: Promoting for upgrading Veterinary Single Stage - One 2019-07- IDA / 61490 sector innovation and Post Request for Bids Open - National 69,000.00 0.00 Canceled 2018-09-23 2018-09-28 2018-11-09 2018-12-09 2019-01-14 Standards and Drug Envelope 13 modernizing service delivery Adminstration Office Laboratory NP-MOLD-124125-CW-RFB / Construction of Lab Animal Experimental Building Component B: Promoting (Additional Storey) and Single Stage - One 2020-03- IDA / 61490 sector innovation and Post Request for Bids Open - National 63,650.00 44,869.19 Signed 2019-12-10 2019-12-24 2019-12-15 2019-12-25 2020-01-15 2020-01-24 2020-02-04 2020-01-08 2020-02-29 2020-06-11 Construction of Poultry Envelope 30 modernizing service delivery Rearing Shed(cage system) at VSDRL, including procurement of Fume hood NP-MOLD-123402-CW-RFB / Component B: Promoting Construction of Livestock Single Stage - One 2020-07- IDA / 61490 sector innovation and Post Request for Bids Open - National 45,500.00 0.00 Canceled 2020-01-22 2020-01-27 2020-02-27 2020-03-13 2020-04-07 Collection Centrea, Golbazar, Envelope 06 modernizing service delivery Siraha NP-MOLD-125381-CW-RFQ Component C: Promoting / Construction of Livestock Smallholder Inclusive Value Request for Single Stage - One 2020-07- IDA / 61490 Post Open - National 13,700.00 0.00 Canceled 2020-02-19 2020-03-27 2020-04-15 collection center (Goats)-1 No- Chains for Selected Livestock Quotations Envelope 14 DLSU Hetauda Commodities Page 2 NP-MOLD-124128-CW-RFB / Component B: Promoting Single Stage - One 2020-07- Construction of Model Meat IDA / 61490 sector innovation and Post Request for Bids Open - National 45,500.00 30,401.26 Signed 2020-01-15 2020-02-03 2020-01-20 2020-02-07 2020-01-23 2020-03-05 2020-02-12 2020-05-26 2020-03-14 2020-07-08 Envelope 12 Training Centre, Duhabi modernizing service delivery NP-MOLD-123399-CW-RFB / Component B: Promoting Single Stage - One 2020-10- Construction of Veterinary Lab- IDA / 61490 sector innovation and Post Request for Bids Open - National 136,500.00 0.00 Canceled 2020-03-10 2020-03-15 2020-04-15 2020-04-30 2020-05-25 Envelope 22 State 5 modernizing service delivery NP-MOLD-125466-CW-RFQ / Construction of Component B: Promoting Request for Single Stage - One 2020-06- wooden/steel crossings and IDA / 61490 sector innovation and Post Limited 13,700.00 3,627.98 Completed 2020-02-25 2019-12-01 2020-04-21 2019-12-08 Quotations Envelope 20 improvement-3 Nos at modernizing service delivery Manang, DLSU, Pokhara NP-MOLD-71773-CW-RFB / Component B: Promoting Construction of molecular Single Stage - Two 2021-03- IDA / 61490 sector innovation and Post Request for Bids Open - National 182,000.00 0.00 Canceled 2019-10-16 2019-10-21 2019-12-02 2020-02-14 2020-03-20 laboratory at Central Envelope 20 modernizing service delivery Veterinary Laboratory NP-MOLD-147537-CW-RFB / Component B: Promoting Construction of molecular Single Stage - One 2021-05- IDA / 61490 sector innovation and Post Request for Bids Open - National 182,000.00 0.00 Canceled 2020-01-10 2020-01-15 2020-02-26 2020-03-27 2020-05-01 laboratory at Central Envelope 01 modernizing service delivery Veterinary Laboratory NP-MOLD-125373-CW-RFB / Component B: Promoting Construction of livestock Request for Single Stage - One 2020-07- IDA / 61490 sector innovation and Post Open - National 27,300.00 0.00 Canceled 2020-02-25 2020-04-21 collection center (Goats)-2 Quotations Envelope 20 modernizing service delivery Slice- DLSU, Biratnagar NP-MOLD-147380-CW-RFB / Component B: Promoting Construction of Livestock Single Stage - One 2021-10- IDA / 61490 sector innovation and Post Request for Bids Open - National 909,100.00 606,371.74 Signed 2020-08-06 2020-11-09 2020-08-11 2020-11-10 2020-09-22 2020-12-10 2020-10-22 2021-01-07 2020-11-26 2021-01-31 Market- 2 Slices (Morang and Envelope 22 modernizing service delivery Rupandehi) NP-MOLD-115828-CW-RFB / Component B: Promoting Construction of Livestock Single Stage - One 2021-03- IDA / 61490 sector innovation and Post Request for Bids Open - National 1,500,000.00 782,337.54 Signed 2020-09-10 2020-12-21 2020-09-15 2020-12-22 2020-10-27 2021-01-21 2020-11-26 2021-02-18 2020-12-31 2021-03-23 Service Centre in 10 project Envelope 31 modernizing service delivery districts. (10 slices) NP-MOLD-125391-CW-RFQ Component B: Promoting / Construction of Livestock Request for Single Stage - One 2021-02- IDA / 61490 sector innovation and Post Open - National 13,700.00 0.00 Canceled 2020-10-13 2020-12-08 Collection Centre (Goat)- 1 Quotations Envelope 06 modernizing service delivery (DLSU Butwal) NP-MOLD-125389-CW-RFQ Component B: Promoting Request for Single Stage - One 2021-01- / Construction of Biological IDA / 61490 sector innovation and Post Open - National 18,200.00 0.00 Canceled 2020-09-22 2020-11-17 Quotations Envelope 16 pIt-1 (DLSU Butwal) modernizing service delivery NP-MOLD-195104-CW-RFB / Component B: Promoting Single Stage - One 2021-10- Construction of Bull Mother IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 58,845.36 Signed 2020-12-25 2020-11-12 2020-12-30 2020-11-12 2021-01-29 2020-12-13 2021-02-28 2021-01-12 2021-04-04 2021-02-01 Envelope 01 Shed at Lahan modernizing service delivery NP-MOLD-125350-CW-RFB / Component B: Promoting Construction of Seed Single Stage - One 2021-07- IDA / 61490 sector innovation and Post Request for Bids Open - National 91,000.00 42,255.16 Signed 2020-12-09 2020-12-06 2020-12-14 2020-12-06 2021-01-13 2021-01-05 2021-02-02 2021-01-12 2021-03-03 2021-02-16 Processing and Storage Unit- Envelope 01 modernizing service delivery DLSU, Biratnagar NP-MOLD-125354-CW-RFB / Component B: Promoting Construction of Seed Single Stage - One 2021-07- IDA / 61490 sector innovation and Post Request for Bids Open - National 91,000.00 42,004.68 Signed 2020-12-17 2020-12-16 2020-12-22 2020-12-20 2021-01-22 2021-01-19 2021-02-11 2021-02-10 2021-03-12 2021-03-07 Processing and Storage Unit- Envelope 10 modernizing service delivery DLSU, Butwal NP-MOLD-125465-CW-RFQ / Construction of Component B: Promoting Request for Single Stage - One 2021-02- wooden/steel crossings and IDA / 61490 sector innovation and Post Limited 13,700.00 0.00 Canceled 2020-10-20 2020-12-05 Quotations Envelope 03 improvement-3 Nos at modernizing service delivery Mustang DLSU, Pokhara NP-MOLD-125349-CW-RFB / Component B: Promoting Construction of Seed Single Stage - One 2020-06- IDA / 61490 sector innovation and Post Request for Bids Open - National 91,000.00 0.00 Canceled 2020-01-28 2020-02-26 2020-02-02 2020-03-27 2020-02-05 2020-02-25 2020-03-21 Processing and Storage Unit- Envelope 19 modernizing service delivery DLSU, Pokhara NP-MOLD-147382-CW-RFB / Component B: Promoting Construction of Farm Single Stage - One 2021-04- IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 0.00 Canceled 2020-09-10 2020-09-15 2020-10-27 2020-11-26 2020-12-31 Quarantine Building at NLBO Envelope 30 modernizing service delivery Pokhara NP-MOLD-161429-CW-RFB / Component B: Promoting Construction of molecular Single Stage - One 2021-06- IDA / 61490 sector innovation and Post Request for Bids Open - National 356,000.00 0.00 Canceled 2020-09-25 2020-09-30 2020-10-31 2020-11-15 2020-12-14 laboratory at Central Envelope 12 modernizing service delivery Veterinary Laboratory NP-MOLD-205250-CW-RFB / Component B: Promoting Single Stage - One 2021-08- Construction of Bull Shed at IDA / 61490 sector innovation and Post Request for Bids Open - National 90,000.00 61,890.44 Signed 2020-11-30 2020-11-29 2020-12-05 2020-12-02 2021-01-04 2021-01-01 2021-02-03 2021-01-08 2021-03-10 2021-01-18 Envelope 07 NLBO, Pokhara modernizing service delivery NP-MOLD-206418-CW-RFB / Component B: Promoting Single Stage - One 2021-07- Construction of Goat IDA / 61490 sector innovation and Post Request for Bids Open - National 48,000.00 41,314.47 Signed 2021-02-10 2021-02-09 2021-02-15 2021-02-11 2021-03-17 2021-03-14 2021-03-18 2021-03-30 2021-04-22 2021-04-04 Envelope 21 Collection Shed-DLSU, Butwal modernizing service delivery NP-MOLD-125469-CW-RFQ Component B: Promoting / Construction of Livestock Request for Single Stage - One 2021-06- IDA / 61490 sector innovation and Post Open - National 27,090.00 0.00 Canceled 2021-03-03 2021-04-22 Collection Centre (Goats)- 2 Quotations Envelope 21 modernizing service delivery Nos- 2 Slices, DLSU, Pokhara NP-MOLD-224630-CW-RFB / Component B: Promoting Under Construction of Dairy Single Stage - One 2021-10- IDA / 61490 sector innovation and Post Request for Bids Open - National 50,000.00 0.00 Implementat 2021-03-21 2021-06-09 2021-03-26 2021-06-10 2021-05-07 2021-06-06 2021-07-11 Collection Centre (PPP model), Envelope 09 modernizing service delivery ion Kaski-DLSU, Pokhara NP-MOLD-224631-CW-RFB / Component B: Promoting Under Construction of Goat Single Stage - One 2021-10- IDA / 61490 sector innovation and Post Request for Bids Open - National 50,000.00 0.00 Implementat 2021-03-22 2021-06-08 2021-03-27 2021-06-10 2021-05-08 2021-06-07 2021-07-12 Collection Centre, Tanahun- Envelope 10 modernizing service delivery ion DLSU, Pokhara NP-MOLD-224632-CW-RFB / Component B: Promoting Under Single Stage - One 2021-10- Construction of Animal Shed IDA / 61490 sector innovation and Post Request for Bids Open - National 50,000.00 0.00 Implementat 2021-03-22 2021-03-24 2021-03-27 2021-03-25 2021-05-08 2021-06-07 2021-07-12 Envelope 10 at Budhitola Farm modernizing service delivery ion Page 3 NP-MOLD-125371-CW-RFB / Construction of Livestock Component B: Promoting Single Stage - One 2022-04- Collection Centers- 3 Nos (3 IDA / 61490 sector innovation and Post Request for Bids Open - National 41,000.00 0.00 Canceled 2021-09-24 2021-10-24 2021-11-24 2021-12-14 2022-01-12 Envelope 12 Slices) Sankhuwasabha, modernizing service delivery Rasuwa and Dadeldhura) National NP-MOLD-224639-CW-RFB / Component B: Promoting Procurement Pending Construction of Semen Single Stage - One 2022-10- IDA / 61490 sector innovation and Post Request for Bids Open - National Document - 1 360,000.00 0.00 Implementat 2021-09-15 2021-09-20 2021-11-01 2021-12-01 2022-01-05 Production and Processing Envelope 02 modernizing service delivery Envelope process ion Lab at Lahan (Non Bank-SPD) NP-MOLD-233391-CW-RFQ / Construction of Milk Component B: Promoting Request for Pending Collection Centre-3 Numbers Request for Single Stage - One 2021-08- IDA / 61490 sector innovation and Post Open - National Quotations (Non 27,500.00 0.00 Implementat 2021-05-26 2021-07-10 - 3 Lots , Lot 1: Siraha Quotations Envelope 24 modernizing service delivery Bank-SPD) ion Lot 2: Saptari and Lot 3: Rasuwa)-DLSU Hetauda NP-MOLD-236794-CW-RFQ / Construction and Component B: Promoting Request for Under Maintenance of drainage Request for Single Stage - One 2021-07- IDA / 61490 sector innovation and Post Limited Quotations (Non 8,000.00 0.00 Implementat 2021-06-05 2021-06-26 system and Apron at Quotations Envelope 11 modernizing service delivery Bank-SPD) ion Veterinary Council, Tripureshwar, Kathmandu National NP-MOLD-125351-CW-RFB / Component B: Promoting Procurement Pending Construction of Seed Single Stage - One 2022-06- IDA / 61490 sector innovation and Post Request for Bids Open - National Document - 1 91,000.00 0.00 Implementat 2021-12-02 2021-12-07 2022-01-07 2022-01-27 2022-02-25 Processing and Storage Unit- Envelope 25 modernizing service delivery Envelope process ion DLSU, Hetauda (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOLD-40007-GO-DIR / Component D: Project Two SUV vehicles for Project IDA / V0290 Management and Knowledge Post Direct Selection Direct 160,000.00 145,555.53 Completed 2018-02-22 2018-02-22 2018-02-27 2018-03-18 2018-04-03 2018-04-19 2018-09-30 2018-04-25 Management Unit. Generation Component B: Promoting NP-MOLD-40009-GO-DIR / IDA / V0290 sector innovation and Post Direct Selection Direct 135,000.00 97,540.21 Completed 2018-02-22 2018-02-22 2018-02-27 2018-03-18 2018-04-03 2018-04-19 2018-09-30 2018-06-10 Double Cab-3 Numbers modernizing service delivery Component D: Project NP-MOLD-40306-GO-RFQ / Request for Single Stage - One IDA / V0290 Management and Knowledge Post Limited 10,000.00 8,704.93 Completed 2018-03-02 2018-05-09 2018-04-27 2018-05-18 2018-10-24 2018-06-11 Furniture for PMU. Quotations Envelope Generation Component D: Project NP-MOLD-47064-GO-DIR / IDA / 61490 Management and Knowledge Post Direct Selection Direct 4,000.00 3,505.41 Completed 2018-02-22 2018-02-22 2018-02-27 2018-03-18 2018-04-03 2018-04-19 2018-09-30 2018-05-03 Scooter-2 Nos. Generation Component D: Project NP-MOLD-47068-GO-DIR / IDA / 61490 Management and Knowledge Post Direct Selection Direct 16,000.00 13,254.00 Completed 2018-02-22 2018-02-22 2018-02-27 2018-03-18 2018-04-03 2018-04-19 2018-09-30 2018-05-03 Motorcycle-6 Nos. Generation Component D: Project NP-MOLD-47070-GO-RFB / IDA / 61490 Management and Knowledge Post Direct Selection Direct 200,000.00 130,053.61 Completed 2018-04-16 2018-02-22 2018-04-21 2018-06-07 2018-06-03 2018-06-12 2018-11-30 2018-06-22 Double Cab Pickup-4 Nos. Generation NP-MOLD-50023-GO-RFQ / Component D: Project Office equipment (Computer, Request for Single Stage - One IDA / 61490 Management and Knowledge Post Open - National 13,000.00 11,434.42 Completed 2018-03-02 2018-04-27 2018-06-17 2018-07-12 2018-06-26 Printer, Photocopier, Camera, Quotations Envelope Generation Scanner, LCD Monitor, Laptop) NP-MOLD-45296-GO-RFB / Component B: Promoting Procurement of ear tags, Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 136,360.00 89,533.60 Completed 2018-11-04 2018-12-17 2018-11-09 2018-12-18 2018-12-21 2019-01-17 2019-01-20 2019-02-14 2019-02-24 2019-03-15 2019-06-24 2019-06-28 applicators, pins etc. for Envelope modernizing service delivery animal identification system NP-MOLD-72004-GO-RFB / Component B: Promoting Procurement of improved bull Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 22,800.00 0.00 Canceled 2018-10-28 2018-11-02 2018-12-07 2019-01-06 2019-02-11 2019-05-12 developed from DCIP and ET Envelope modernizing service delivery (5 numbers in 1 contract) NP-MOLD-42555-GO-RFB / Component B: Promoting Single Stage - One Strengthening of CBPL for PPR IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 0.00 Canceled 2018-04-20 2018-04-25 2018-06-06 2018-07-06 2018-08-10 2019-02-06 Envelope vaccine production modernizing service delivery NP-MOLD-44683-GO-RFB / Component B: Promoting Chaff cutters-240 Nos., Yarn Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 274,000.00 0.00 Canceled 2018-04-20 2018-04-25 2018-06-06 2018-07-06 2018-08-10 2019-02-06 machine-1 Nos., Deharing Envelope modernizing service delivery machine-2 Nos. NP-MOLD-44687-GO-RFB / Component B: Promoting Single Stage - One Freeze (-80 degree C) for IDA / 61490 sector innovation and Post Request for Bids Open - National 80,000.00 0.00 Canceled 2018-04-20 2018-04-25 2018-06-06 2018-07-06 2018-08-10 2019-02-06 Envelope rabies vaccine production lab modernizing service delivery NP-MOLD-44691-GO-RFB / Component B: Promoting Single Stage - One Equipment for Veterinary and IDA / 61490 sector innovation and Post Request for Bids Open - National 150,000.00 0.00 Canceled 2018-04-20 2018-04-25 2018-06-06 2018-07-06 2018-08-10 2019-02-06 Envelope Livestock Quality Management modernizing service delivery NP-MOLD-45563-GO-RFB / Component B: Promoting Procurement of AI Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 25,000.00 0.00 Canceled 2018-09-30 2018-10-05 2018-11-16 2018-12-16 2019-01-20 2019-07-19 consumables (AI sheaths, Envelope modernizing service delivery gloves etc.) NP-MOLD-45566-GO-RFB / Component B: Promoting Single Stage - One Purchase of sires and dams IDA / 61490 sector innovation and Post Request for Bids Open - National 500,000.00 0.00 Canceled 2018-09-30 2018-10-05 2018-11-16 2018-12-16 2019-01-20 2019-07-19 Envelope (Dairy animals)-100 Nos. modernizing service delivery NP-MOLD-45576-GO-RFB / Component B: Promoting Procurement of veterinary Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 120,000.00 0.00 Canceled 2018-09-30 2018-10-05 2018-11-16 2018-12-16 2019-01-20 2019-07-19 drugs for infertility Envelope modernizing service delivery management campaigns Page 4 NP-MOLD-45588-GO-RFB / Component C: Promoting Procurement of food quality Smallholder Inclusive Value Single Stage - One IDA / 61490 Post Request for Bids Open - National 307,050.00 0.00 Canceled 2018-09-10 2018-09-15 2018-10-27 2018-11-26 2018-12-31 2019-06-29 monitoring kits and Chains for Selected Livestock Envelope consumables Commodities NP-MOLD-45585-GO-RFB / Component B: Promoting Single Stage - One Procurement of urea molasses IDA / 61490 sector innovation and Post Request for Bids Open - National 387,500.00 0.00 Canceled 2018-09-10 2018-09-15 2018-10-27 2018-11-26 2018-12-31 2019-06-29 Envelope block making machines modernizing service delivery Component D: Project NP-MOLD-49790-GO-RFP / Single Stage - One IDA / 61490 Management and Knowledge Post Request for Bids Open - National 63,000.00 0.00 Canceled 2018-04-12 2018-04-17 2018-05-29 2018-06-28 2018-08-02 2019-01-29 Furniture Envelope Generation Component B: Promoting NP-MOLD-45580-GO-RFB / Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 60,000.00 0.00 Canceled 2018-09-10 2018-09-15 2018-10-27 2018-11-26 2018-12-31 2019-06-29 Procurement of vaccine boxes Envelope modernizing service delivery NP-MOLD-45276-GO-RFB / Procurement of servers-2 Component D: Project Nos, Computers-15 Nos, Single Stage - One IDA / 61490 Management and Knowledge Post Request for Bids Open - National 221,500.00 0.00 Canceled 2018-04-26 2018-05-01 2018-06-12 2018-07-12 2018-08-16 2019-02-12 Software for accounting and Envelope Generation accessories for central ICT set up Component D: Project NP-MOLD-42553-GO-DIR / IDA / 61490 Management and Knowledge Post Direct Selection Direct 1,860.00 0.00 Canceled 2018-04-15 2018-04-20 2018-05-25 2018-11-21 Refrigerator for PMU 5 Nos. Generation NP-MOLD-76095-GO-DIR / Component D: Project Procurement of Hard Top Jeep IDA / 61490 Management and Knowledge Post Direct Selection Direct 55,000.00 49,678.94 Completed 2018-11-01 2018-11-19 2018-11-06 2018-11-28 2018-12-11 2018-12-11 2019-02-09 2018-12-12 for Nepal Veterinary Council Generation Component B: Promoting NP-MOLD-41659-GO-RFB / Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 150,000.00 201,673.41 Completed 2018-11-25 2018-11-23 2018-11-30 2018-11-26 2019-01-11 2018-12-25 2019-02-10 2018-12-30 2019-03-17 2019-01-21 2019-09-13 2019-05-09 Procurement of FMD Vaccine Envelope modernizing service delivery NP-MOLD-45583-GO-RFB / Component B: Promoting Procurement of improved Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 54,550.00 0.00 Canceled 2018-12-16 2018-12-21 2019-02-01 2019-03-03 2019-04-07 2019-10-04 varieties of fodder and forage Envelope modernizing service delivery seed/seedling/sapling NP-MOLD-73134-GO-RFQ / Procurement of awareness Component D: Project Request for Single Stage - One raising and capacity building IDA / 61490 Management and Knowledge Post Open - National 15,000.00 0.00 Canceled 2018-11-30 2019-01-25 2019-07-24 Quotations Envelope materials, four-monthly and Generation annual bulletin publication NP-MOLD-45304-GO-RFB / Component D: Project Single Stage - One Procurement of Vehicles IDA / 61490 Management and Knowledge Post Request for Bids Open - National 683,000.00 410,879.23 Completed 2018-12-16 2018-12-20 2018-12-21 2018-12-21 2019-02-01 2019-01-23 2019-03-03 2019-01-31 2019-04-07 2019-03-01 2019-07-06 2019-04-30 Envelope (Double Cab Pick-ups- 15) Generation NP-MOLD-71828-GO-RFB / Procurement of Semen straw Component B: Promoting Single Stage - One sealing,filing and printing IDA / 61490 sector innovation and Post Request for Bids Open - National 136,360.00 129,316.82 Completed 2018-12-30 2018-12-16 2019-01-04 2018-12-17 2019-02-08 2019-01-16 2019-03-10 2019-02-08 2019-04-14 2019-04-02 2019-07-13 2019-07-15 Envelope machine for Animal Breeding modernizing service delivery Office, Lahan NP-MOLD-45582-GO-RFB / Component B: Promoting Procurement of automatic Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 123,000.00 92,199.64 Completed 2018-12-16 2018-12-07 2018-12-21 2018-12-17 2019-02-01 2019-01-08 2019-03-03 2019-01-20 2019-04-07 2019-02-15 2019-08-05 2019-05-09 vaccinators and vaccine Envelope modernizing service delivery boxes. NP-MOLD-71749-GO-RFQ / Component D: Project Request for Single Stage - One Procurement of furniture and IDA / 61490 Management and Knowledge Post Open - National 18,200.00 6,211.78 Completed 2019-01-04 2019-02-15 2019-02-25 2019-04-16 2019-04-11 Quotations Envelope Fixtures. Generation NP-MOLD-87726-GO-DIR / Component D: Project Procurement of 8 desktops IDA / 61490 Management and Knowledge Post Direct Selection Direct 11,400.00 8,639.22 Completed 2018-11-28 2018-11-27 2018-12-03 2018-12-10 2019-01-07 2018-12-21 2019-04-07 2018-12-23 and 6 printers. Generation NP-MOLD-45298-GO-RFB / Procurement of equipment for Component B: Promoting district semen banks (Liquid Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 500,000.00 0.00 Canceled 2018-09-10 2018-09-15 2018-10-27 2018-11-26 2018-12-31 2019-06-29 nitrogen containers, semen Envelope modernizing service delivery storage containers and other accessories) NP-MOLD-45571-GO-RFB / Procurement of equipment for Component B: Promoting Single Stage - One the Establishment of frozen IDA / 61490 sector innovation and Post Request for Bids Open - National 250,000.00 0.00 Canceled 2018-08-30 2018-09-04 2018-10-16 2018-11-15 2018-12-20 2019-06-18 Envelope semen facility for Eastern modernizing service delivery Region NP-MOLD-45569-GO-RFB / Component B: Promoting Procurement of equipment for Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 50,000.00 0.00 Canceled 2018-08-30 2018-09-04 2018-10-16 2018-11-15 2018-12-20 2019-06-18 the strengthening of goat Envelope modernizing service delivery resources centers. NP-MOLD-45567-GO-RFB / Component B: Promoting Procurement of equipment for Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 0.00 Canceled 2018-08-30 2018-09-04 2018-10-16 2018-11-15 2018-12-20 2019-06-18 the strengthening of livestock Envelope modernizing service delivery breeding center at Pokhara NP-MOLD-45240-GO-RFB / Component B: Promoting Single Stage - One Procurement of equipment for IDA / 61490 sector innovation and Post Request for Bids Open - National 50,000.00 0.00 Canceled 2018-09-16 2018-09-21 2018-11-02 2018-12-02 2019-01-06 2019-07-05 Envelope strengthening VSDAO Lab modernizing service delivery NP-MOLD-40011-GO-DIR / Procurement of two-wheelers: Component D: Project Single Stage - One Slice 1- Motorcycle (17 IDA / 61490 Management and Knowledge Post Request for Bids Open - National 55,000.00 35,913.83 Completed 2019-01-20 2019-01-28 2019-01-25 2019-01-29 2019-03-08 2019-02-27 2019-04-07 2019-03-24 2019-05-12 2019-04-11 2019-07-11 2019-06-28 Envelope numbers) Generation Slice 2- Scooters (7 numbers) NP-MOLD-45303-GO-RFB / Procurement of equipment for field Artificial Insemination Component B: Promoting centers and technicians: Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 587,000.00 373,236.51 Completed 2019-01-20 2019-01-11 2019-01-25 2019-01-17 2019-03-08 2019-02-10 2019-04-07 2019-03-07 2019-05-12 2019-04-05 2019-08-10 2019-07-15 Slice 1: Liquid nitrogen Envelope modernizing service delivery containers, Referees, etc. Slice 2: Guns, Sheaths, Gloves,Accessories,etc. Page 5 NP-MOLD-72007-GO-RFB / Component B: Promoting Request for Single Stage - One Procurement of consumables IDA / 61490 sector innovation and Post Limited 18,200.00 14,761.86 Completed 2019-03-25 2019-03-07 2019-05-20 2019-03-26 2019-07-19 2019-04-07 Quotations Envelope for vaccine production modernizing service delivery NP-MOLD-99981-GO-RFQ / Procurement of furniture and Component B: Promoting Pending Request for Single Stage - One fixtures for newly constructed IDA / 61490 sector innovation and Post Limited 2,720.00 0.00 Implementati 2019-03-30 2019-05-25 2019-07-24 Quotations Envelope Chyangra Resource Centre at modernizing service delivery on Mustang NP-MOLD-99982-GO-RFQ / Procurement of furniture and fixtures for DLSU Butwal ( Component D: Project Pending Request for Single Stage - One Tables 8, Chairs 8, Tea Table IDA / 61490 Management and Knowledge Post Limited 11,800.00 0.00 Implementati 2019-03-01 2019-04-26 2019-06-25 Quotations Envelope 6, Sofa set 3, curtains and Generation on carpeting 1, Cupboard 3 and Filing cabinet 4 in 1 contract) NP-MOLD-99983-GO-RFQ / Procurement of furniture and fixtures for DLSU Pokhara ( Component D: Project Request for Single Stage - One Tables 8, Chairs 8, Tea Table IDA / 61490 Management and Knowledge Post Limited 11,800.00 3,292.33 Completed 2019-03-31 2019-06-03 2019-05-26 2019-06-25 2019-07-25 2019-07-03 Quotations Envelope 6, Sofa set 3, curtains and Generation carpeting 1, Cupboard 3 and Filing cabinet 4 in 1 contract) NP-MOLD-99984-GO-RFQ / Procurement of furniture and fixtures for DLSU Hetauda( Component D: Project Request for Single Stage - One Tables 8, Chairs 8, Tea Table IDA / 61490 Management and Knowledge Post Limited 11,800.00 11,002.53 Completed 2019-03-01 2019-01-24 2019-04-26 2019-02-20 2019-06-25 2019-02-25 Quotations Envelope 6, Sofa set 3, curtains and Generation carpeting 1, Cupboard 3 and Filing cabinet 4 in 1 contract) NP-MOLD-99985-GO-RFQ / Procurement of furniture and fixtures for DLSU Biratnagar( Component D: Project Pending Request for Single Stage - One Tables 8, Chairs 8, Tea Table IDA / 61490 Management and Knowledge Post Limited 11,800.00 0.00 Implementati 2019-03-15 2019-05-10 2019-07-09 Quotations Envelope 6, Sofa set 3, curtains and Generation on carpeting 1, Cupboard 3 and Filing cabinet 4 in 1 contract) NP-MOLD-72311-GO-RFQ / Procurement of furniture and fixtures for DLSU Butwal ( Component D: Project Request for Single Stage - One Tables 8, Chairs 8, Tea Table IDA / 61490 Management and Knowledge Post Open - National 11,800.00 0.00 Canceled 2018-10-30 2018-12-25 2019-03-25 Quotations Envelope 6, Sofa set 3, curtains and Generation carpeting 1, Cupboard 3 and Filing cabinet 4 in 1 contract) NP-MOLD-71750-GO-RFQ / Procurement of furniture and Component B: Promoting Request for Single Stage - One fixtures for newly constructed IDA / 61490 sector innovation and Post Open - National 2,720.00 0.00 Canceled 2019-01-04 2019-03-02 2019-06-30 Quotations Envelope Chyangra Resource Centre at modernizing service delivery Mustang NP-MOLD-72310-GO-RFQ / Procurement of furniture and fixtures for DLSU Pokhara ( Component D: Project Request for Single Stage - One Tables 8, Chairs 8, Tea Table IDA / 61490 Management and Knowledge Post Open - National 11,800.00 0.00 Canceled 2018-10-30 2018-12-25 2019-03-25 Quotations Envelope 6, Sofa set 3, curtains and Generation carpeting 1, Cupboard 3 and Filing cabinet 4 in 1 contract) NP-MOLD-72307-GO-RFQ / Procurement of furniture and fixtures for DLSU Hetauda( Component D: Project Request for Single Stage - One Tables 8, Chairs 8, Tea Table IDA / 61490 Management and Knowledge Post Open - National 11,800.00 0.00 Canceled 2018-10-30 2018-12-25 2019-03-25 Quotations Envelope 6, Sofa set 3, curtains and Generation carpeting 1, Cupboard 3 and Filing cabinet 4 in 1 contract) NP-MOLD-72021-GO-RFQ / Procurement of furniture and fixtures for DLSU Biratnagar ( Component D: Project Request for Single Stage - One Tables 8, Chairs 8, Tea Table IDA / 61490 Management and Knowledge Post Open - National 11,800.00 0.00 Canceled 2018-10-30 2018-12-25 2019-03-25 Quotations Envelope 6, Sofa set 3, curtains and Generation carpeting 1, Cupboard 3 and Filing cabinet 4 in 1 contract) NP-MOLD-72199-GO-RFB / Procurement of Automatic Component B: Promoting Single Stage - One Bacteria Identification Machine IDA / 61490 sector innovation and Post Request for Bids Open - National 72,800.00 31,741.41 Completed 2019-03-15 2019-02-18 2019-03-20 2019-02-25 2019-04-19 2019-03-28 2019-05-04 2019-04-04 2019-06-08 2019-05-22 2019-08-07 2019-07-12 Envelope for Central Veterinary modernizing service delivery Laboratory NP-MOLD-99986-GO-RFQ / Procurement of consumables(tubes, reagents, Component B: Promoting Request for Single Stage - One kits, etc.) for PCR in Veterinary IDA / 61490 sector innovation and Post Limited 13,636.00 12,908.25 Completed 2019-03-15 2019-04-12 2019-05-10 2019-05-16 2019-07-09 2019-07-15 Quotations Envelope Standards and Drug modernizing service delivery Adminstration Office Laboratory. NP-MOLD-72003-GO-RFB / Procurement of consumables(tubes, reagents, Component B: Promoting Single Stage - One kits, etc.) for PCR in Veterinary IDA / 61490 sector innovation and Post Request for Bids Open - National 13,636.00 0.00 Canceled 2018-12-30 2019-01-04 2019-02-08 2019-03-10 2019-04-15 2019-07-14 Envelope Standards and Drug modernizing service delivery Adminstration Office Laboratory. Component B: Promoting Under NP-MOLD-45565-GO-RFB / Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 90,900.00 78,345.23 Implementati 2019-03-01 2019-03-07 2019-03-06 2019-03-17 2019-04-05 2019-04-11 2019-04-20 2019-04-30 2019-05-19 2019-07-18 Procurement of sexed semen Envelope modernizing service delivery on NP-MOLD-50025-GO-RFB / Component D: Project Procurement of 12 laptops, 20 Single Stage - One IDA / 61490 Management and Knowledge Post Request for Bids Open - National 43,600.00 33,172.19 Completed 2019-03-03 2019-03-31 2019-03-08 2019-04-07 2019-04-30 2019-04-22 2019-05-22 2019-05-27 2019-06-12 2019-07-26 2019-07-15 desktops, 22 printers and 4 Envelope Generation photocopy machines NP-MOLD-45575-GO-RFB / Component B: Promoting Procurement of breeding Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 182,000.00 0.00 Canceled 2019-01-20 2019-01-25 2019-03-08 2019-04-07 2019-05-12 2019-11-08 bucks and does (100 numbers Envelope modernizing service delivery in 1 contract) Page 6 NP-MOLD-42552-GO-RFB / Procurement of Component B: Promoting Single Stage - One i) Refrigerator for 4 DLSUs. IDA / 61490 sector innovation and Post Request for Bids Open - National 62,000.00 0.00 Canceled 2019-09-22 2019-09-27 2019-11-08 2019-12-08 2020-01-12 2020-07-10 Envelope ii) Vaccine storage freeze for modernizing service delivery 20 Veterinary Hospitals. NP-MOLD-45289-GO-RFB / Component D: Project Request for Single Stage - One Procurement of Tablets-100 IDA / 61490 Management and Knowledge Post Open - National 20,000.00 0.00 Canceled 2019-10-06 2019-12-01 2020-05-29 Quotations Envelope Nos. Generation NP-MOLD-109667-GO-RFB / Procurement of equipment (Freeze Dryer, Bioreactor, Component B: Promoting Cross flow filtration System, Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 400,000.00 0.00 Canceled 2019-04-28 2019-05-10 2019-05-03 2019-05-16 2019-06-14 2019-06-13 2019-07-14 2019-08-18 2019-11-16 High Speed Refrigerated Envelope modernizing service delivery Centrifuge,Roller Culture System) for National Vaccine Production Laboratory. NP-MOLD-125327-GO-RFB / Component B: Promoting Single Stage - One Procurement and installation IDA / 61490 sector innovation and Post Request for Bids Open - National 91,000.00 29,349.32 Signed 2019-11-03 2019-12-12 2019-11-08 2019-12-12 2019-12-09 2020-01-12 2019-12-29 2020-01-27 2020-01-27 2020-03-12 2020-05-26 Envelope of Bio-safety Cabinet modernizing service delivery Component B: Promoting NP-MOLD-125347-GO-RFB / Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 364,000.00 151,891.98 Completed 2019-11-10 2019-11-08 2019-11-15 2019-11-11 2019-12-16 2019-12-10 2019-12-31 2019-12-18 2020-01-29 2020-01-12 2020-04-28 2020-07-13 Procurement of FMD vaccine Envelope modernizing service delivery NP-MOLD-72001-GO-RFB / Procurement of pure Jersey Component B: Promoting Single Stage - One bull (10 numbers) and pure IDA / 61490 sector innovation and Post Request for Bids Open - National 237,000.00 0.00 Canceled 2019-10-28 2019-11-02 2019-12-02 2019-12-17 2020-01-15 2020-05-14 Envelope Holstein Bull (10 numbers) for modernizing service delivery breeding centers in 1 contract NP-MOLD-125364-GO-RFQ Component D: Project Request for Single Stage - One / Procurement of Furniture IDA / 61490 Management and Knowledge Post Limited 10,700.00 9,230.71 Completed 2019-11-09 2019-11-22 2020-01-04 2020-01-22 2020-02-18 2020-03-01 Quotations Envelope and Fixtures-PMU Generation NP-MOLD-125369-GO-RFQ / Procurement of Antigen, Component B: Promoting Request for Single Stage - One Anti body, Reagent Kit and IDA / 61490 sector innovation and Post Limited 18,200.00 13,774.41 Signed 2019-10-19 2019-12-12 2019-12-14 2020-01-27 2020-01-13 Quotations Envelope Chemical etc for quality test- modernizing service delivery VSDRL NP-MOLD-125361-GO-RFQ / Procurement of Slice 1: Video Camera- 2 Nos, Component D: Project Request for Single Stage - One Camera-3 Nos and Projector- IDA / 61490 Management and Knowledge Post Limited 18,500.00 10,135.62 Signed 2019-10-25 2019-12-25 2019-12-10 2020-02-05 2020-01-24 Quotations Envelope 3 set Generation Slice 2: Air condition for office- 8 Nos for PMU NP-MOLD-125345-GO-RFB / Component B: Promoting Single Stage - One Procurement of Machinery for IDA / 61490 sector innovation and Post Request for Bids Open - National 182,000.00 87,137.18 Signed 2019-12-02 2019-12-18 2019-12-07 2019-12-20 2020-01-07 2020-01-19 2020-01-27 2020-02-05 2020-03-02 2020-03-12 2020-06-30 Envelope animal Quarantine Check Post modernizing service delivery NP-MOLD-125322-GO-RFB / Procurement of Vehicles: Slice 1: 4 wheeler for Component B: Promoting monitoring purpose-1 No Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 192,000.00 44,099.84 Completed 2019-11-15 2019-12-03 2019-11-20 2019-12-05 2019-12-21 2020-01-05 2020-01-10 2020-01-08 2020-02-04 2020-02-05 2020-02-10 2020-04-05 Slice 2: Procurement of Envelope modernizing service delivery Motorcycles-36 Nos Slice 3: Procurement of Scooters-20 Nos NP-MOLD-141024-GO-RFB / Equipment for NVPL -7 slice 1: Lypholizer 2: Cross flow filtration System 3: Refrigerated Centrifuge, Component B: Promoting Hot Air Oven Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 348,000.00 177,237.09 Signed 2019-11-28 2019-11-18 2019-12-03 2019-11-22 2020-01-03 2019-12-20 2020-01-23 2020-01-21 2020-02-17 2020-03-05 2020-05-17 4: Roller Culture System Envelope modernizing service delivery 5: Automatic labeling & Washing Machine, Digital Fogger 6: Deep Freezer 7: Spectrophotometer with ELISA reader NP-MOLD-125330-GO-RFB / Procurement of Equipment Slice 1: USG-20 Nos and Slice 2: X-Ray Machine-10 Nos Component B: Promoting Slice 3: Automatic Biochemical Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 796,000.00 0.00 Canceled 2019-11-15 2019-10-02 2019-11-20 2019-10-04 2019-12-21 2020-01-10 2020-02-04 2020-06-03 analyzer Envelope modernizing service delivery Slice 4: Hematological analyzer Slice 5: Fully Automatic Bomb Calorie-meter NP-MOLD-125334-GO-RFB / Component B: Promoting Supplying and Installation of Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 127,500.00 72,068.47 Signed 2019-12-30 2019-12-13 2020-01-04 2020-01-05 2020-02-04 2020-01-14 2020-02-19 2020-02-05 2020-03-15 2020-03-13 2020-05-29 Prefab cold room for vaccine Envelope modernizing service delivery storage-7 Nos NP-MOLD-125340-GO-RFB / Supplying and Installation of Component B: Promoting Single Stage - One deep boring for water supply IDA / 61490 sector innovation and Post Request for Bids Open - National 45,500.00 0.00 Canceled 2020-11-20 2020-11-25 2020-12-26 2021-01-15 2021-02-13 2021-05-14 Envelope and irrigation at Goat Farm, modernizing service delivery Chitlang Component B: Promoting NP-MOLD-126885-GO-RFB / Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 182,000.00 0.00 Canceled 2020-02-09 2020-03-15 2020-02-14 2020-03-17 2020-02-17 2020-03-18 2020-04-16 2020-07-15 Procurement of Ear Tags Envelope modernizing service delivery NP-MOLD-125336-GO-RFB / Procurement of Equipment for Component B: Promoting Single Stage - One AI field technicians: IDA / 61490 sector innovation and Post Request for Bids Open - National 273,000.00 0.00 Canceled 2019-12-10 2019-12-15 2019-12-18 2020-01-17 2020-02-15 2020-05-15 Envelope Slice 1: Sheath and Gun, Slice modernizing service delivery 2: Gloves and Straw NP-MOLD-125339-GO-RFB / Component B: Promoting Procurement of Silage Making Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 31,000.00 24,530.21 Completed 2019-12-20 2019-12-20 2019-12-25 2019-12-22 2020-01-25 2020-01-21 2020-02-14 2020-01-23 2020-03-14 2020-02-14 2020-06-12 2020-07-13 Machine for Farmer Field Envelope modernizing service delivery Schools -4 Nos Page 7 NP-MOLD-125335-GO-RFB / Component B: Promoting Procurement of Kjeldahl Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 32,000.00 0.00 Canceled 2019-12-15 2019-12-20 2020-01-20 2020-02-09 2020-03-09 2020-06-07 Digestion Distillation and Envelope modernizing service delivery Titration System NP-MOLD-125486-GO-DIR / Component B: Promoting Procurement of embryos for IDA / 61490 sector innovation and Post Direct Selection Direct 36,000.00 0.00 Canceled 2020-02-20 2020-02-25 2020-03-21 2020-05-20 embryo transfer modernizing service delivery Component B: Promoting NP-MOLD-126766-GO-DIR / IDA / 61490 sector innovation and Post Direct Selection Direct 27,300.00 0.00 Canceled 2019-12-24 2019-12-29 2020-01-23 2020-03-23 Procurement of proven semen modernizing service delivery NP-MOLD-125377-GO-RFQ / Procurement of Combined Component B: Promoting Request for Single Stage - One Harvester (Tractor with tractor IDA / 61490 sector innovation and Post Limited 14,000.00 0.00 Canceled 2020-01-13 2020-03-10 2020-05-09 Quotations Envelope operated reaper) by DLSU modernizing service delivery Hetauda NP-MOLD-125330-GO-RFB- 2 / Procurement of Equipment Slice 1: USG-10 Nos Slice 2: X-Ray Machine-8 Nos Component B: Promoting Slice 3: Automatic Biochemical Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 796,000.00 0.00 Canceled 2020-01-16 2020-02-06 2020-01-21 2020-02-07 2020-02-21 2020-03-12 2020-04-06 2020-07-05 analyzer Envelope modernizing service delivery Slice 4: Hematological analyzer Slice 5: Fully Automatic Bomb Calorie-meter NP-MOLD-148188-GO-RFQ Component B: Promoting Request for Single Stage - One / Procurement of store related IDA / 61490 sector innovation and Post Limited 2,300.00 0.00 Canceled 2019-12-23 2020-02-17 2020-04-17 Quotations Envelope software modernizing service delivery NP-MOLD-153347-GO-RFB / Component B: Promoting Single Stage - One Procurement of Dumas IDA / 61490 sector innovation and Post Request for Bids Open - National 70,000.00 0.00 Canceled 2020-02-26 2020-03-15 2020-03-02 2020-03-17 2020-04-01 2020-04-28 2020-05-27 2020-07-26 Envelope System Fully automated modernizing service delivery machine NP-MOLD-153351-GO-RFB / Component B: Promoting Single Stage - One Procurement of Milk Analyzer- IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 0.00 Canceled 2020-02-28 2020-03-15 2020-03-04 2020-03-17 2020-04-03 2020-04-13 2020-05-08 2020-07-07 Envelope 20 nos modernizing service delivery NP-MOLD-153867-GO-RFQ Component B: Promoting / Procurement of Software of Request for Single Stage - One IDA / 61490 sector innovation and Post Limited 4,550.00 4,004.68 Completed 2020-02-19 2020-03-20 2020-04-14 2020-03-26 2020-05-29 2020-04-30 Veterinarian Registration and Quotations Envelope modernizing service delivery Management NP-MOLD-165052-GO-RFB / Procurement of i) Project MIS Component A: Strengthening (ii) Android Based LMIS (iii) Single Stage - One IDA / 61490 Critical regulatory and Post Request for Bids Open - National 85,000.00 0.00 Canceled 2020-09-03 2020-09-08 2020-10-08 2020-10-18 2020-11-08 2021-02-06 Web Based LMIS (iv) Supply Envelope Institutional Capacity and Installation and Support for Video Conference System NP-MOLD-125337-GO-RFB / Component B: Promoting Procurement of Equipment for Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 45,500.00 0.00 Canceled 2020-11-12 2020-11-17 2020-12-18 2021-01-07 2021-02-05 2021-05-06 Farm Mechanization of Envelope modernizing service delivery Budhitola Farm NP-MOLD-186877-GO-RFB / Component B: Promoting Procurement of Frozen Semen Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 113,600.00 65,298.48 Signed 2020-09-20 2020-09-29 2020-09-25 2020-09-30 2020-10-25 2020-10-29 2020-11-24 2020-11-26 2020-12-18 2021-01-04 2021-05-17 Straw Counting Machine for Envelope modernizing service delivery NLBO, Pokhara NP-MOLD-186878-GO-RFB / Procurement of RT- PCR Component B: Promoting Single Stage - One Machine- 5 Numbers for IDA / 61490 sector innovation and Post Request for Bids Open - National 204,545.00 94,729.35 Signed 2020-09-18 2020-10-05 2020-09-23 2020-10-06 2020-10-23 2020-11-04 2020-11-22 2020-12-30 2020-12-16 2021-01-29 2021-05-15 Envelope VSDRL,NVPL,FMD/TADS, CVL, modernizing service delivery Kathamndu and RVL Surkhet) Component B: Promoting NP-MOLD-186880-GO-RFB / Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 681,818.00 480,542.03 Signed 2020-09-20 2020-09-28 2020-09-25 2020-09-29 2020-10-25 2020-10-29 2020-11-24 2020-11-26 2020-12-18 2020-12-24 2021-05-17 Procurement of FMD Vaccine Envelope modernizing service delivery NP-MOLD-186923-GO-RFB / Component B: Promoting Procurement of Software for Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 108,650.00 0.00 Canceled 2020-09-25 2020-09-30 2020-10-30 2020-11-29 2020-12-23 2021-05-22 updating CASA and SMILE Envelope modernizing service delivery system for NLBO, Pokhara NP-MOLD-186925-GO-RFB / Procurement of: Slice 1; PPE set, Slice 2; PCR Reagent, Component B: Promoting Slice 3; Diagnostic kit, Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 172,730.00 144,735.56 Signed 2020-09-27 2020-10-21 2020-10-02 2020-11-01 2020-11-22 2020-12-01 2020-11-30 2020-12-25 2020-12-22 2021-05-24 Reagent, Kit, Antigen, Envelope modernizing service delivery Chemicals, antibody for different veterinary laboratories. NP-MOLD-153348-GO-RFB / Procurement of Desktop Component D: Project Single Stage - One computer- 20 Nos, Laptop-15 IDA / 61490 Management and Knowledge Post Request for Bids Open - National 6,400.00 0.00 Canceled 2020-09-10 2020-09-15 2020-09-18 2020-10-03 2020-11-07 2020-12-22 Envelope and Printer-20 and Photocopy Generation Machine-2 NP-MOLD-189236-GO-RFB / Procurement of Desktop Component D: Project Single Stage - One computer- 20 Nos, Laptop-15 IDA / 61490 Management and Knowledge Post Request for Bids Open - National 64,000.00 55,172.92 Signed 2020-08-31 2020-09-11 2020-09-05 2020-09-17 2020-10-05 2020-10-12 2020-10-20 2020-10-16 2020-11-13 2020-12-02 2021-01-12 Envelope and Printer-20 and Photocopy Generation Machine-2 NP-MOLD-196428-GO-RFB / Procurement of (i) Veterinary Hematology Analyzer (ii) Veterinary Biochemistry Component B: Promoting Analyzer (iii) Color doppler Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 935,945.00 531,962.04 Signed 2020-10-30 2020-10-16 2020-11-04 2020-10-16 2020-12-04 2020-11-20 2021-01-03 2020-12-01 2021-02-07 2021-02-24 2021-05-28 Ultrasound Machine (iv) Envelope modernizing service delivery Digital X ray Machine (v) Fully Automatic Bomb Calorimeter (vi) DUMAS (vii) Ear Tags- 7 Slices Page 8 NP-MOLD-196838-GO-RFQ Component B: Promoting / Procurement of Furniture Request for Single Stage - One IDA / 61490 sector innovation and Post Limited 11,000.00 6,630.54 Signed 2020-10-27 2020-10-28 2020-12-22 2020-12-02 2021-02-05 and Fixtures including Quotations Envelope modernizing service delivery Furnishing (PMU) NP-MOLD-153355-GO-RFB / Component B: Promoting Procurement of Murrah He- Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 200,000.00 0.00 Canceled 2020-11-03 2020-11-08 2020-12-08 2020-12-23 2021-01-27 2021-04-27 Buffalo for breeding-10 Envelope modernizing service delivery numbers NP-MOLD-92646-GO-DIR / Component B: Promoting Procurement of improved bull IDA / 61490 sector innovation and Post Direct Selection Direct 22,800.00 0.00 Canceled 2019-03-24 2019-03-29 2019-05-03 2019-07-02 developed from DCIP and ET. modernizing service delivery (5 numbers) NP-MOLD-196466-GO-RFB / Procurement of Cold Component B: Promoting Room/Refrigerators for Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 255,000.00 206,932.28 Signed 2020-10-21 2020-10-19 2020-10-26 2020-10-20 2020-11-25 2020-11-19 2020-12-25 2020-12-17 2021-01-29 2021-01-25 2021-04-29 Municipality, Veterinary Envelope modernizing service delivery Hospital and Livestock Service Expert Centers NP-MOLD-196430-GO-RFB / Component B: Promoting Single Stage - One Procurement of Milk Analyzer IDA / 61490 sector innovation and Post Request for Bids Open - National 80,000.00 40,112.63 Signed 2020-10-30 2020-10-15 2020-11-04 2020-10-16 2020-12-04 2020-11-20 2021-01-03 2020-12-15 2021-02-07 2021-01-10 2021-05-28 Envelope for Cooperatives modernizing service delivery NP-MOLD-195095-GO-RFB / Component B: Promoting Procurement of Silage Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 35,000.00 16,396.68 Signed 2020-10-30 2020-11-24 2020-11-04 2020-11-25 2020-12-04 2020-12-25 2021-01-03 2021-01-13 2021-02-07 2021-02-19 2021-06-07 Machine for farmer field Envelope modernizing service delivery school (DLSU Biratnagar) NP-MOLD-198701-GO-RFB / Component D: Project Under Single Stage - One Procurement of Furniture and IDA / 61490 Management and Knowledge Post Request for Bids Open - National 30,000.00 0.00 Implementati 2021-02-17 2021-02-21 2021-02-22 2021-02-22 2021-03-24 2021-03-24 2021-04-23 2021-05-28 2021-07-12 Envelope Furnishing (DLSU, Butwal) Generation on NP-MOLD-195102-GO-RFB / Procurement of Furniture and Fixtures for Newly Component B: Promoting Under Single Stage - One Constructed Municipal IDA / 61490 sector innovation and Post Request for Bids Open - National 28,500.00 0.00 Implementati 2021-02-24 2021-04-13 2021-03-01 2021-04-16 2021-04-12 2021-05-12 2021-06-16 2021-07-31 Envelope Livestock Service Center and modernizing service delivery on for Social Mobilizers (DLSU, Hetauda) NP-MOLD-198712-GO-RFB / Component B: Promoting Under Single Stage - One Procurement of Silage Making IDA / 61490 sector innovation and Post Request for Bids Open - National 91,000.00 0.00 Implementati 2021-02-26 2021-02-09 2021-03-03 2021-02-10 2021-04-02 2021-03-14 2021-05-02 2021-06-06 2021-09-04 Envelope Machine (DLSU, Pokhara) modernizing service delivery on NP-MOLD-195097-GO-RFB / Component B: Promoting Under Procurement of Silage Making Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 41,500.00 0.00 Implementati 2021-03-10 2021-03-26 2021-03-15 2021-03-26 2021-04-14 2021-05-14 2021-06-18 2021-10-16 Machine and Chaff Cutter Envelope modernizing service delivery on Machine ( DLSU, Hetauda) NP-MOLD-186876-GO-RFB / Component B: Promoting Single Stage - One Procurement of Equipment for IDA / 61490 sector innovation and Post Request for Bids Open - National 50,000.00 28,440.13 Signed 2021-02-20 2021-03-11 2021-02-25 2021-03-14 2021-03-27 2021-04-13 2021-04-11 2021-04-16 2021-05-10 2021-04-28 2021-07-09 Envelope Goat Farm, Budhitola modernizing service delivery NP-MOLD-195094-GO-RFB / Component B: Promoting Under Procurement of Silage Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 50,000.00 0.00 Implementati 2021-01-31 2021-02-02 2021-02-05 2021-02-03 2021-03-07 2021-03-05 2021-04-06 2021-05-11 2021-08-19 Machine for Dairy Envelope modernizing service delivery on Cooperatives (DLSU, Butwal) NP-MOLD-198703-GO-RFB / Component B: Promoting Under Single Stage - One Procurement of Milk Analyzer IDA / 61490 sector innovation and Post Request for Bids Open - National 15,000.00 0.00 Implementati 2021-02-26 2021-02-21 2021-03-03 2021-02-22 2021-04-02 2021-03-24 2021-04-12 2021-05-06 2021-06-20 Envelope (DLSU, Butwal) modernizing service delivery on NP-MOLD-196467-GO-RFB / Component B: Promoting Procurement of Mineral Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 90,000.00 74,094.53 Signed 2021-02-10 2021-01-26 2021-02-15 2021-01-26 2021-03-17 2021-02-26 2021-03-27 2021-03-14 2021-04-25 2021-03-30 2021-06-24 Mixture Plant (2 Numbers) for Envelope modernizing service delivery Cooperative NP-MOLD-186941-GO-RFB / Component B: Promoting Under Single Stage - One Procurement of Chilling VAT - IDA / 61490 sector innovation and Post Request for Bids Open - National 409,090.00 0.00 Implementati 2021-02-25 2021-01-31 2021-03-02 2021-01-31 2021-04-01 2021-04-11 2021-05-10 2021-07-09 Envelope 60 Numbers for Cooperatives modernizing service delivery on NP-MOLD-195098-GO-RFB / Component B: Promoting Under Single Stage - One Procurement of Chilling VAT IDA / 61490 sector innovation and Post Request for Bids Open - National 27,500.00 0.00 Implementati 2021-02-19 2021-03-24 2021-02-24 2021-03-26 2021-03-26 2021-04-10 2021-05-15 2021-06-29 Envelope for POs (DLSU, Hetauda) modernizing service delivery on NP-MOLD-198714-GO-RFQ Component D: Project / Procurement of Furniture Request for Single Stage - One IDA / 61490 Management and Knowledge Post Limited 18,000.00 8,035.91 Signed 2021-02-09 2021-02-19 2021-04-06 2021-03-22 2021-05-21 and Furnishing (DLSU, Quotations Envelope Generation Pokhara) NP-MOLD-195100-GO-RFQ / Procurement of Desktop Component B: Promoting Under Request for Single Stage - One Computer and Printer for IDA / 61490 sector innovation and Post Limited 16,800.00 0.00 Implementati 2021-03-02 2021-04-27 2021-06-11 Quotations Envelope Social Mobilizers (DLSU, modernizing service delivery on Hetauda) NP-MOLD-198705-GO-RFQ Component D: Project / Procurement of Furniture Request for Single Stage - One IDA / 61490 Management and Knowledge Post Limited 20,000.00 9,421.10 Signed 2021-02-02 2021-03-05 2021-03-30 2021-05-03 2021-05-14 and Furnishing (DLSU, Quotations Envelope Generation Biratnagar) NP-MOLD-205260-GO-RFQ Component B: Promoting Request for Single Stage - One / Procurement of Freezer (-40 IDA / 61490 sector innovation and Post Limited 7,500.00 6,232.42 Signed 2021-02-02 2021-03-26 2021-03-30 2021-05-16 2021-04-29 Quotations Envelope dc), DLSU Biratnagar modernizing service delivery NP-MOLD-196772-GO-RFQ Component B: Promoting Pending Request for Single Stage - One / Procurement of Video IDA / 61490 sector innovation and Post Limited 4,000.00 0.00 Implementati 2021-09-25 2021-10-23 2021-11-22 Quotations Envelope Conference System for PMU modernizing service delivery on NP-MOLD-125375-GO-RFQ Component D: Project Under Request for Single Stage - One / Procurement of Furniture IDA / 61490 Management and Knowledge Post Limited 4,600.00 0.00 Implementati 2021-02-05 2020-02-19 2021-03-27 2021-04-26 Quotations Envelope and Fixtures- DLSU Biratnagar Generation on Page 9 NP-MOLD-196836-GO-RFQ / Procurement of Needeles , Component B: Promoting Pending Request for Single Stage - One Syringe, Gloves, Chemicals IDA / 61490 sector innovation and Post Limited 15,000.00 0.00 Implementati 2021-03-02 2021-04-27 2021-06-26 Quotations Envelope etc. for FMD Control modernizing service delivery on Pragramme NP-MOLD-220892-GO-RFB / Component B: Promoting Single Stage - One Procurement of Pure Jersey IDA / 61490 sector innovation and Post Request for Bids Open - National 193,600.00 111,205.84 Signed 2021-03-10 2021-02-22 2021-03-15 2021-02-25 2021-04-26 2021-03-29 2021-05-06 2021-03-31 2021-05-27 2021-04-28 2021-07-11 Envelope and Holstein Bull (7 Numbers) modernizing service delivery NP-MOLD-220893-GO-RFB / Component B: Promoting Under Procurement of Semen of Pure Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 60,000.00 0.00 Implementati 2021-03-10 2021-04-14 2021-03-15 2021-04-27 2021-04-14 2021-04-24 2021-05-18 2021-07-02 Jersey and Holstein for NLBO, Envelope modernizing service delivery on Pokhara NP-MOLD-220894-GO-RFB / Procurement of Equipment for National Vaccine Production Lab Component B: Promoting Under Single Stage - One Slice 1: Procurement of Solid IDA / 61490 sector innovation and Post Request for Bids Open - National 147,300.00 0.00 Implementati 2021-03-05 2021-03-02 2021-03-10 2021-03-10 2021-04-09 2021-04-09 2021-04-19 2021-04-16 2021-05-24 2021-07-08 Envelope Waste Incinerator-1 and modernizing service delivery on Double Door Autoclave-1 Slice 2: Procurement of Walk in Freezer-1 NP-MOLD-220891-GO-RFB / Procurement of equipment Slice 1: Operating Table, Chain Kupi, Oxygen Cylinder, OT Lighting, C-arm Component B: Promoting Under Slice 2: Endoscopy Machine, Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 115,500.00 0.00 Implementati 2021-03-10 2021-03-14 2021-03-15 2021-03-15 2021-04-14 2021-05-14 2021-06-08 2021-07-08 Phaco Machine, Lithotripsy Envelope modernizing service delivery on Machine Slice 3: Coagulation Analyzer, Microscope, Autoclave, Coagulation Analyzer, Cautery Machine NP-MOLD-220895-GO-RFB / procurement of Equipment for Component B: Promoting Under Veterinary Standard and Drug Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 30,000.00 0.00 Implementati 2021-03-05 2021-04-14 2021-03-10 2021-04-20 2021-04-21 2021-05-20 2021-05-01 2021-05-30 2021-06-29 Regulation Laboratory : Ultra Envelope modernizing service delivery on Pure Water Purifier-1 and Washing Machine-1 NP-MOLD-206916-GO-RFB / Component B: Promoting Procurement of Logistics for Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 100,000.00 0.00 Canceled 2021-02-10 2021-02-15 2021-03-17 2021-04-16 2021-05-21 2021-07-10 Pedigree Performance Envelope modernizing service delivery Recording System NP-MOLD-215711-GO-RFB / Component B: Promoting Pending Single Stage - One Procurement of Murrah IDA / 61490 sector innovation and Post Request for Bids Open - National 40,000.00 0.00 Implementati 2021-09-15 2021-09-20 2021-10-20 2021-11-04 2021-12-03 2022-02-01 Envelope Buffalo Bull-10 for NLBO, modernizing service delivery on Pokhara NP-MOLD-233395-GO-RFQ / Procurement of Veterinary Component B: Promoting Under Medicine for parasite control Request for Single Stage - One IDA / 61490 sector innovation and Post Open - National 22,000.00 0.00 Implementati 2021-05-17 2021-06-03 2021-06-21 2021-07-21 in Goat (Distribution to Quotations Envelope modernizing service delivery on farmers group/cooperatives)- DLSU, Butwal NP-MOLD-220890-GO-RFQ Component B: Promoting / Procurement of Boer Bucks Request for Single Stage - One IDA / 61490 sector innovation and Post Open - National 18,200.00 0.00 Canceled 2021-03-23 2021-05-07 2021-06-06 and distribution -DLSU, Quotations Envelope modernizing service delivery Pokhara NP-MOLD-224636-GO-RFB / Procurement of Equipment Component B: Promoting Pending (Generators-6 Numbers, Single Stage - One IDA / 61490 sector innovation and Post Request for Bids Open - National 159,000.00 0.00 Implementati 2022-01-10 2022-01-15 2022-02-14 2022-02-24 2022-03-25 2022-05-24 Transformer-3, Online UPS-1 Envelope modernizing service delivery on and Stabilizer-2) for Quarantine and Laboratories NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOLD-45636-NC-RFB / Component C: Promoting Hiring of Bank/Financing Smallholder Inclusive Value Single Stage - One institutions for providing IDA / 61490 Post Request for Bids Open - National 200,000.00 0.00 Canceled 2018-09-02 2018-09-07 2018-10-19 2018-11-18 2018-12-23 2023-06-15 Chains for Selected Livestock Envelope services for matching grant Commodities program NP-MOLD-45639-NC-DIR / Component A: Strengthening Consultative workshop for Request for Single Stage - One IDA / 61490 Critical regulatory and Post Open - National 5,000.00 0.00 Canceled 2018-04-15 2018-06-10 2018-12-07 developing veterinary drug Quotations Envelope Institutional Capacity act, animal welfare act NP-MOLD-129046-NC-RFB / Procurement of service of Livestock Social Mobilizers for Component D: Project Single Stage - One Slice 1: DLSU, Pokhara IDA / 61490 Management and Knowledge Post Request for Bids Open - National 1,800,000.00 0.00 Canceled 2019-10-10 2019-10-15 2019-11-14 2019-12-14 2020-01-18 2023-05-02 Envelope Slice 2: DLSU, Hetauda Generation Slice 3: DLSU, Biratnagar Slice 4: DLSU, Butwal NP-MOLD-164342-NC-RFQ / Component B: Promoting Request for Single Stage - One Dairy product diversification IDA / 61490 sector innovation and Post Open - National 22,000.00 0.00 Canceled 2020-03-23 2020-03-23 2020-04-27 2020-07-26 Quotations Envelope training modernizing service delivery NP-MOLD-164342-NC-RFQ- Component B: Promoting Request for Single Stage - One 2 / Dairy Product IDA / 61490 sector innovation and Post Open - National 22,000.00 14,289.38 Signed 2020-10-25 2020-11-12 2020-11-29 2021-01-22 2021-02-27 Quotations Envelope Diversification Training modernizing service delivery NP-MOLD-206622-NC-RFQ / Component D: Project Pending Preparation of Digital Request for IDA / 61490 Management and Knowledge Post 10,000.00 0.00 Implementati 2020-12-15 2021-02-09 2021-05-10 Documentation of the Project Quotations Generation on achievement and Successes Page 10 NP-MOLD-205262-NC-RFQ / Component B: Promoting Request for Single Stage - One Dairy Product Diversification IDA / 61490 sector innovation and Post Open - National 21,800.00 13,995.90 Signed 2021-02-15 2021-01-13 2021-04-12 2021-03-05 2021-07-11 Quotations Envelope Training- DLSU, Pokhara modernizing service delivery NP-MOLD-205264-NC-RFQ / Component B: Promoting Under Request for Single Stage - One Dairy Product Diversification IDA / 61490 sector innovation and Post Open - National 21,800.00 0.00 Implementati 2021-02-23 2021-01-26 2021-04-14 2021-07-13 Quotations Envelope Training-DLSU, Hetauda modernizing service delivery on NP-MOLD-205269-NC-RFQ / Component B: Promoting Request for Single Stage - One Dairy Product Diversification IDA / 61490 sector innovation and Post Open - National 21,800.00 16,575.55 Signed 2021-02-07 2021-01-31 2021-04-04 2021-03-30 2021-07-03 Quotations Envelope Training-DLSU, Butwal modernizing service delivery NP-MOLD-205267-NC-RFQ / Component B: Promoting Request for Single Stage - One Dairy Product Diversification IDA / 61490 sector innovation and Post Open - National 21,800.00 16,165.29 Signed 2021-03-01 2021-01-22 2021-04-16 2021-03-12 2021-07-15 Quotations Envelope Training-DLSU, Biratnagar modernizing service delivery NP-MOLD-238445-NC-RFQ / Preparation of Video Documentary on Component D: Project Pending Request for Single Stage - One Slice 1: NLSIP implementation IDA / 61490 Management and Knowledge Post Limited 3,650.00 0.00 Implementati 2021-06-21 2021-07-02 2021-07-14 Quotations Envelope status and achievement Generation on Slice 2 : Livestock Markets in Nepal CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOLD-45235-CS-CQS / Hiring of national consulting Component D: Project Consultant firm for goat semen IDA / 61490 Management and Knowledge Post Qualification Open - National 18,000.00 0.00 Canceled 2018-08-15 2018-09-05 2018-10-19 2018-11-18 2018-12-23 2019-06-21 production advisory and Generation Selection training NP-MOLD-45237-CS-QCBS / Hiring of consulting agency to Component D: Project Quality And Cost- undertake livestock food IDA / 61490 Management and Knowledge Post Open - National 205,000.00 0.00 Canceled 2018-09-10 2018-10-01 2018-11-14 2018-12-12 2019-01-11 2019-02-15 2019-03-22 2020-03-21 Based Selection quality awareness program Generation development and campaign NP-MOLD-72776-CS-CQS / Preparation of i) Livestock Business Promotion Policy (State level) ii) Animal Health Component A: Strengthening Consultant policy (State level) iii) IDA / 61490 Critical regulatory and Post Qualification Open - National 60,600.00 0.00 Canceled 2018-11-18 2018-12-09 2019-01-22 2019-02-21 2019-03-28 2020-03-27 Livestock Service Policy (State Institutional Capacity Selection level) iv) Veterinary Drug Act v) Infectious Disease Control Act vi) Livestock Breeding Policy NP-MOLD-72652-CS-CQS / Procurement of engineering consultant firm for design, Component D: Project Consultant estimate and supervision of IDA / 61490 Management and Knowledge Post Qualification Open - National 300,000.00 319,370.69 Signed 2018-12-16 2018-11-29 2019-01-06 2018-12-26 2019-02-19 2019-01-22 2019-03-21 2019-02-27 2019-04-25 2019-03-07 2023-04-24 construction of laboratory, Generation Selection office building, quarters , farm shed etc NP-MOLD-45234-CS-CQS / Component D: Project Consultant Procurement of consultant IDA / 61490 Management and Knowledge Post Qualification Open - National 72,800.00 67,908.43 Completed 2019-03-03 2019-04-23 2019-03-24 2019-04-24 2019-05-07 2019-10-16 2019-06-06 2019-11-29 2019-07-11 2019-12-02 2020-01-07 2020-07-13 service for Capacity Needs Generation Selection Assessment (CENA) NP-MOLD-45232-CS-QCBS / Hiring of International consulting firm for setting of Component D: Project genetic evaluation system for Quality And Cost- IDA / 61490 Management and Knowledge Prior Open - International 641,400.00 0.00 Canceled 2019-10-10 2019-10-31 2019-12-14 2020-01-11 2020-02-10 2020-03-16 2020-04-20 2021-04-20 cattle, buffaloes and goats, Based Selection Generation training training national experts and providing advisory NP-MOLD-96310-CS-CQS / Hiring of consulting firm for: i) Mapping & assessment of producer organizations ii) Matching Grant & FFS Guidelines Component D: Project Consultant iii) Feasibility study of IDA / 61490 Management and Knowledge Post Qualification Open - National 155,000.00 147,848.20 Signed 2019-03-24 2019-03-07 2019-04-14 2019-05-28 2019-04-09 2019-06-27 2019-04-28 2019-08-01 2019-04-28 2019-11-29 livestock market Generation Selection iv)Animal Identification Strategy & Implementation Roadmap v)Losses due to FMD & PPR in Nepal NP-MOLD-73550-CS-CQS / Component D: Project Consultant Procurement of consultant IDA / 61490 Management and Knowledge Post Qualification Open - National 36,360.00 0.00 Canceled 2018-10-07 2018-10-28 2018-12-11 2019-01-10 2019-02-14 2019-07-14 service for study of losses due Generation Selection to FMD and PPR in Nepal. NP-MOLD-72191-CS-CQS / Procurement of consultant service for preparation of Component A: Strengthening Consultant Laboratory Quality Control IDA / 61490 Critical regulatory and Post Qualification Open - National 22,800.00 0.00 Canceled 2019-01-27 2019-02-17 2019-04-02 2019-05-02 2019-06-06 2019-09-04 Manual, Laboratory SOP, Institutional Capacity Selection Laboratory Protocols and Laboratory Formats. NP-MOLD-73374-CS-CQS / Procurement of consultant for Component C: Promoting Consultant Feasibility study and Smallholder Inclusive Value IDA / 61490 Post Qualification Open - National 22,720.00 0.00 Canceled 2018-10-07 2018-10-28 2018-12-11 2019-01-10 2019-02-14 2019-08-13 Engineering estimate of Chains for Selected Livestock Selection Central Livestock market in Commodities Khaireni, Chitwan. Page 11 NP-MOLD-45227-CS-QCBS / Procurement of consulting firm to provide technical consultants (Veterinary/Livestock expert, Component D: Project Quality And Cost- ICT expert,IEC Expert, M & E IDA / 61490 Management and Knowledge Prior Open - International 2,000,000.00 1,529,958.03 Signed 2019-02-28 2019-03-19 2019-03-21 2019-03-21 2019-05-04 2019-07-18 2019-06-15 2019-09-08 2019-07-15 2019-12-06 2019-08-19 2019-12-27 2019-09-23 2020-01-02 2023-06-30 Based Selection expert,Co-operative expert, Generation Agribusiness expert, Value Chain expert, Environment & social safeguard specialist, and among others) NP-MOLD-96593-CS-CQS / Component D: Project Consultant Livestock Sector Baseline IDA / 61490 Management and Knowledge Post Qualification Open - National 80,000.00 28,814.79 Signed 2019-04-28 2019-04-15 2019-05-19 2019-08-25 2019-07-02 2019-11-26 2019-08-01 2020-01-26 2019-09-05 2020-01-28 2020-02-02 study Generation Selection NP-MOLD-73365-CS-CQS / Procurement of consultant service for: i) Livestock Market Information System Software Component A: Strengthening Consultant ii) Livestock Management IDA / 61490 Critical regulatory and Post Qualification Open - National 276,000.00 0.00 Canceled 2019-10-20 2019-11-10 2019-12-24 2020-01-23 2020-02-27 2021-02-26 Information Software Institutional Capacity Selection iii) Livestock Extension Model App iv) Veterinary Surveillance and Epidemiology Strengthening Software NP-MOLD-129078-CS-CQS / Hiring of consultancy for Component D: Project Consultant Performance Pedigree IDA / 61490 Management and Knowledge Post Qualification Open - National 150,000.00 0.00 Canceled 2019-11-07 2019-11-22 2020-01-05 2020-02-04 2020-03-10 2023-06-23 Recording System and Data Generation Selection Management and Operation. NP-MOLD-196777-CS-CQS / Procurement of Consulting Component B: Promoting Consultant Services for Feasibility Study IDA / 61490 sector innovation and Post Qualification Open - National 18,200.00 0.00 Canceled 2021-02-10 2021-03-03 2021-03-27 2021-04-26 2021-05-16 2021-07-15 of Milk Production and Milk modernizing service delivery Selection Processing in Sudur Paschim Province INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOLD-50334-CS-INDV / Component D: Project Individual Procurement of Procurement IDA / 61490 Management and Knowledge Prior Consultant Open 106,000.00 87,540.31 Signed 2018-08-26 2018-08-16 2018-10-14 2018-11-06 2018-11-04 2018-11-22 2018-12-09 2018-11-22 2022-12-08 Consultant Generation Selection NP-MOLD-71231-CS-INDV / Component D: Project Individual Procurement of Financial IDA / 61490 Management and Knowledge Post Consultant Open 99,000.00 39,076.77 Signed 2018-08-26 2018-08-29 2018-10-14 2018-10-29 2018-11-04 2018-11-06 2018-12-09 2018-11-18 2022-12-08 Management Consultant Generation Selection NP-MOLD-44701-CS-QCBS / Component D: Project Individual Procurement of Project IDA / 61490 Management and Knowledge Post Consultant Open 160,000.00 132,706.10 Signed 2018-08-29 2018-08-30 2018-10-17 2018-11-06 2018-11-07 2018-11-14 2018-12-12 2018-11-18 2022-12-11 Technical Expert (Lead) Generation Selection NP-MOLD-45239-CS-INDV / Component D: Project Individual Recruitment of central level IDA / 61490 Management and Knowledge Post Consultant Open 45,000.00 0.00 Canceled 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2023-06-11 ICT officer- 1 person Generation Selection NP-MOLD-72024-CS-INDV / Component D: Project Individual Procurement of consultant(s) IDA / 61490 Management and Knowledge Post Consultant Limited 27,270.00 25,276.80 Completed 2018-10-31 2018-11-05 2018-11-07 2018-11-14 2018-11-14 2018-11-15 2018-12-01 2018-11-21 2019-01-25 2019-05-19 for PIM Update Generation Selection NP-MOLD-76664-CS-CDS / Preparation of i) Veterinary Drug Act Component A: Strengthening ii) Infectious Disease Control IDA / 61490 Critical regulatory and Post Direct Selection Direct 41,500.00 29,925.07 Completed 2018-11-25 2018-11-25 2018-12-05 2018-11-30 2019-02-08 2018-12-19 2019-08-07 2019-07-07 Act Institutional Capacity iii) Livestock Breeding Policy through MOU NP-MOLD-96297-CS-INDV / Hiring of consultants for Component A: Strengthening Individual assessment of seed, feed and IDA / 61490 Critical regulatory and Post Consultant Limited 55,000.00 44,865.33 Signed 2019-03-24 2019-03-05 2019-03-31 2019-04-10 2019-04-07 2019-04-11 2019-04-24 2019-04-23 2019-08-22 fodder resources. Institutional Capacity Selection i) International Consultant-1 ii) National Consultant-1 NP-MOLD-96299-CS-INDV / Hiring of consultants for Component A: Strengthening Individual detail assessment of breed IDA / 61490 Critical regulatory and Post Consultant Limited 55,000.00 46,868.89 Signed 2019-03-24 2019-03-05 2019-03-31 2019-04-11 2019-04-07 2019-04-15 2019-04-24 2019-04-15 2019-08-22 and breeding policy: Institutional Capacity Selection i) International Consultant-1 ii) National Consultant-1 NP-MOLD-96300-CS-INDV / Hiring of consultants for Component A: Strengthening Individual preparation of ICT Strategy: IDA / 61490 Critical regulatory and Post Consultant Limited 36,360.00 27,857.39 Signed 2019-03-24 2019-03-11 2019-03-31 2019-04-11 2019-04-07 2019-04-17 2019-04-24 2019-04-30 2019-08-22 i) International Consultant-1 Institutional Capacity Selection ii) National Consultant-1 NP-MOLD-76669-CS-CDS / Component A: Strengthening Preparation of Animal Health IDA / 61490 Critical regulatory and Post Direct Selection Direct 6,300.00 0.00 Canceled 2019-10-28 2019-11-07 2020-01-11 2020-07-09 policy (State level) through Institutional Capacity MOU NP-MOLD-76666-CS-CDS / Component A: Strengthening Preparation of Livestock IDA / 61490 Critical regulatory and Post Direct Selection Direct 6,300.00 0.00 Canceled 2019-10-28 2019-11-07 2020-01-11 2020-07-09 Business Promotion Policy Institutional Capacity (State level) through MOU NP-MOLD-76670-CS-CDS / Component A: Strengthening Preparation of Livestock IDA / 61490 Critical regulatory and Post Direct Selection Direct 6,300.00 0.00 Canceled 2019-10-28 2019-11-07 2020-01-11 2020-07-09 Service Policy (State level) Institutional Capacity through MOU. Page 12 NP-MOLD-71963-CS-INDV / Procurement of International Component B: Promoting Individual consultant for Thermostable IDA / 61490 sector innovation and Post Consultant Limited 90,900.00 0.00 Canceled 2018-10-28 2018-11-02 2018-11-23 2018-12-28 2019-06-26 PPR vaccine production modernizing service delivery Selection service NP-MOLD-101200-CS-INDV Component B: Promoting Individual / Procurement of a consultant IDA / 61490 sector innovation and Post Consultant Limited 13,600.00 10,624.02 Signed 2019-02-28 2019-03-22 2019-03-07 2019-04-10 2019-03-14 2019-04-11 2019-03-31 2019-04-11 2019-06-29 preparation of Laboratory modernizing service delivery Selection Quality Control Manual. NP-MOLD-101953-CS-INDV Component B: Promoting Individual / Procurement of a consultant IDA / 61490 sector innovation and Post Consultant Limited 9,090.00 8,326.20 Signed 2019-02-28 2019-03-22 2019-03-07 2019-04-10 2019-03-14 2019-04-11 2019-03-31 2019-04-11 2019-06-29 for preparation of Laboratory modernizing service delivery Selection SOP, Protocols and Formats. NP-MOLD-101970-CS-CDS / Component A: Strengthening Consulting service for IDA / 61490 Critical regulatory and Prior Direct Selection Direct 800,000.00 0.00 Canceled 2019-06-30 2019-12-18 2019-08-04 2019-10-08 2021-04-05 preparation of Livestock Institutional Capacity Master Plan Component D: Project Individual NP-MOLD-125499-CS-INDV IDA / 61490 Management and Knowledge Post Consultant Limited 25,000.00 23,019.80 Signed 2019-09-06 2019-08-23 2019-09-11 2019-10-20 2019-10-02 2019-10-22 2019-11-06 2019-10-24 2023-06-30 / Hiring of Gender Specialist Generation Selection NP-MOLD-125721-CS-INDV / Hiring of Consultant for Component D: Project Individual Performance Pedigree IDA / 61490 Management and Knowledge Post Consultant Open 130,000.00 0.00 Canceled 2019-09-10 2019-10-14 2019-10-24 2019-11-10 2023-06-30 Recording System and Data Generation Selection Management and System Operation NP-MOLD-125725-CS-INDV Component B: Promoting Individual / Hiring of Bio-medical IDA / 61490 sector innovation and Post Consultant Limited 27,000.00 10,263.44 Signed 2019-11-22 2019-08-25 2019-11-27 2020-03-04 2019-12-04 2020-07-06 2019-12-25 2020-03-06 2022-03-14 Engineer-1 No. modernizing service delivery Selection NP-MOLD-129861-CS-CDS / Hiring of Consultancy (Nepal Component D: Project Agribusiness Innovation IDA / 61490 Management and Knowledge Post Direct Selection Direct 272,730.00 245,531.75 Signed 2019-11-14 2019-12-18 2019-11-24 2020-08-10 2020-01-28 2020-08-19 2023-02-01 Center) for support to Farmers Generation in Proposal Writing NP-MOLD-147386-CS-INDV Component D: Project Individual / Updating of project website IDA / 61490 Management and Knowledge Post Consultant Limited 2,500.00 2,023.24 Completed 2020-01-16 2020-02-24 2020-01-21 2020-03-13 2020-02-11 2020-03-15 2020-03-17 2020-03-18 2020-06-15 2020-04-10 and portal distribution to Generation Selection DLSUs NP-MOLD-147389-CS-INDV / Hiring of consultant for Component B: Promoting Individual performance pedigree IDA / 61490 sector innovation and Post Consultant Limited 115,000.00 102,891.61 Signed 2020-01-15 2020-01-28 2020-01-20 2020-06-15 2020-02-10 2020-06-17 2020-03-16 2020-06-21 2023-03-01 recording system and data modernizing service delivery Selection management and operation NP-MOLD-153340-CS-INDV Component A: Strengthening Individual / Hiring of consultant for IDA / 61490 Critical regulatory and Post Consultant Limited 5,000.00 3,740.34 Completed 2020-01-20 2020-02-21 2020-01-25 2020-02-23 2020-02-01 2020-03-13 2020-02-15 2020-03-19 2020-03-16 2020-05-08 preparation of AMIS software Institutional Capacity Selection NP-MOLD-153855-CS-CDS / Component A: Strengthening Under Consulting Services for IDA / 61490 Critical regulatory and Prior Direct Selection Direct 1,500,000.00 0.00 2020-01-21 2020-01-17 2020-01-31 2020-04-05 2021-10-06 Implementation Livestock Master Plan Institutional Capacity NP-MOLD-159146-CS-INDV Component D: Project Individual / Hiring of IT Assistant for IDA / 61490 Management and Knowledge Post Consultant Limited 2,100.00 1,830.35 Signed 2020-03-01 2020-03-02 2020-03-06 2020-03-04 2020-03-09 2020-03-06 2020-03-18 2020-03-06 2020-06-16 PMU Generation Selection NP-MOLD-180021-CS-INDV Component D: Project Individual / Hiring of consultant for IDA / 61490 Management and Knowledge Post Consultant Limited 2,500.00 0.00 Canceled 2020-06-21 2020-07-07 2020-06-26 2020-07-03 2020-07-20 2020-09-18 Software Development for Generation Selection PMIS Development NP-MOLD-187654-CS-INDV / Hiring of Consultants for developing LMIS (i) Android Component B: Promoting Individual Developer- 1 (ii) Senior Web IDA / 61490 sector innovation and Post Consultant Limited 23,000.00 12,153.37 Signed 2020-08-14 2020-09-22 2020-08-19 2020-12-23 2020-09-09 2020-12-28 2020-10-14 2020-12-29 2021-04-12 Developer-1 and (iii) Junior modernizing service delivery Selection Web Developer-1 person for six months NP-MOLD-153853-CS-INDV Component D: Project Individual / Hiring of Micro Biologist-1 IDA / 61490 Management and Knowledge Post Consultant Limited 3,000.00 0.00 Canceled 2020-02-20 2020-02-12 2020-02-25 2020-03-17 2020-04-21 2020-07-20 No Generation Selection NP-MOLD-199563-CS-INDV Component D: Project Individual Under / Procurement of Matching IDA / 61490 Management and Knowledge Post Consultant Limited 15,000.00 0.00 2020-10-23 2020-11-09 2020-10-28 2020-11-18 2020-12-23 2022-12-31 Implementation Grant Support Facilitator Generation Selection NP-MOLD-205244-CS-INDV Component B: Promoting Individual / Procurement of Web IDA / 61490 sector innovation and Post Consultant Limited 5,000.00 0.00 Canceled 2020-11-24 2021-03-10 2020-11-29 2020-12-09 2020-12-23 2021-04-22 Developer for LMIS modernizing service delivery Selection Page 13 World Bank Assisted National Agricultural Higher Education Project Education Division Indian Council of Agricultural Research Government of India Procurement Plan (Ist Phase – 18 months ) From : May 2017 to Sept.,2018 1 2 I. General 1. Project information Country : India Borrower : Government of India Project Name : NATIONAL AGRICULTURAL HIGHER EDUCATION PROJECT (NAHEP) Project Identification No (ID) : P151072 : -- Project Implementing Agency (PIA): ICAR and all participating Agriculture Universities 2. Bank’s approval Date of the Initial Procurement Plan: 4. Date of General Procurement Notice: 16th December 2016 Period covered by this procurement plan: First 18 months of the project i.e April, 2017 to Sept., 2018 5. Applicable Bank Guideline: a) For Goods ,Works and Non-consulting Services :"Guidelines: Procurement of Goods, Works and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Procurement Guidelines) and revised July 2014; and b) For Consultancy Services :"Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Consultant Guidelines) and revised July 2014; 3 II. Goods, Works and Non-Consulting Services Category Method of Threshold (US$ Prior review Procurement Equivalent) threshold Goods and International Contracts more than All contracts Non- competitive the equivalent of equal to consulting Bidding (ICB) US$ 3 million per or greater than US$2 services(ex contract million equivalent; cluding TI Limited As per para 3.2 of the contracts) International Guideline , all Bidding Contracts more than the equivalent of US $ 100,000 per contract National Contracts more than competitive the equivalent of US$ Bidding (NCB) 100,000 but less than the equivalent of US$ 3 million per contract (with NCB conditions) Shopping ** Up to $100,000 Direct As per para 3.7 of Contracting(DC) Guidelines Community# As per para 3.19 of Participation the guideline Force Account As per para 3.9 of Guidelines Framework As per para 3.6 of Agreements(FA) Guidelines Works ICB Civil works more or All contracts equal to or equivalent of greater than US$10 US$40,000,000 per million equivalent contract NCB Civil works more than 100,000 and upto $40,000,000 (with NCB conditions) Shopping Civil works up to $100,000 DC As per para 3.7 of Guidelines Community As per para 3.19 of participation# the guideline Force Account As per para 3.9 of Guidelines 4 Category Method of Threshold (US$ Prior review Procurement Equivalent) threshold Consultant CQS/LCS Contracts Up to All contracts equal to or s’ Services $300,000 or less per greater than US$1 contract Million equivalent for Single source As per para 3.9-3.11 firms; and equal to or selection (SSS) of Guidelines greater than Individual As per Section V of US$300,000 equivalent contracts Guidelines for individuals QCBS/QBS/FBS for all other cases (i) International >$800,000 shortlist (ii) Shortlist may Up to $800,000 comprise national consultants only * If a transaction comprises several contracts, lots or slices, the aggregate estimated value of all contracts, lots or slices will determine the applicable threshold amount. **State Rate Contracts cannot be used at par with Shopping. If state rate contract exists for an item, the same can be considered as one of the 3 quotations to be sought under shopping procedures. However DGS&D rate contracts are acceptable under any procurement under the Shopping procedure # Community Procurement would be applicable to activities under learning/training pilots It would be based on World Bank “Guidance Note For Management of Procurement Responsibilities In Community-Driven Development Projects dated December 2009 and as included in the Procurement manual. 2. Pre-qualification: Not Applicable 3. Reference to Project Procurement Manual: A Procurement Manual based on World Bank Guidelines “Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers, January 2011,Revised July 2014”and “Selection and Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank Borrowers” has been prepared. All procurements in the project will be governed by the procedures described in the Manual. In case of any inconsistency between the Procurement Manual and the World Bank Guidelines 2011, Revised July 2014, the provisions of the Guidelines shall prevail. 4. Any Other Special Procurement Arrangements (Goods & Works) : A. Contracts procured in advance will be financed under retroactive financing within the specified limits, as agreed to in the Credit Agreement provided 5 they are procured in accordance with agreed processes and procedures for the project and have been cleared as part of procurement plan. B. National Competitive Bidding (NCB) method for procurement of goods, works and non-consulting services as per the above value thresholds will be conducted in accordance with paragraph 3.3 and 3.4 of the World Bank Procurement Guidelines and the following provisions: (i) Only the model bidding documents for NCB agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding; (ii) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access ) along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids; (iii) No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprises from any given State. (iv) Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; (v) Extension of bid validity shall not be allowed with reference to contracts subject to prior review without the prior concurrence of the World Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for prior approved packages, all subsequent requests for extension irrespective of the period. (Such concurrence will be considered by the Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/Employer); (vi) Re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank. (vii) The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project. (viii) Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however for any procurement under the Shopping procedures. (ix) Two or three envelop system will not be used (except when using e- Procurement system assessed and agreed by the Bank). 6 (x) As per 1.1(e) of World Bank Procurement Guidelines, the Association’s right to inspect accounts and records of the bidders, suppliers and contractors will be included in the bidding document. 7 Selection of Consultants 1. Methods and Value thresholds for Consultancy Services Consulting Methods Value Review Arrangements Services Threshold* Consulting i) Quality and Cost Services Based Selection (Firms) (QCBS) ii) Quality Based Selection (QBS) iii) Selection based on a Fixed Budget (FBS) iv) Selection Based on Least Cost First QCBS Contract Basis (LCS) irrespective of value and v) (Selection based Contracts all subsequent on Consultant’s estimated to cost consultancy contracts Qualification equivalent of valued above US$ 1 (CQS) US$ 200,000 or Million will be subject to less per contract. Prior Review by the World Bank. All other contracts vi) Single Source As per the provisions of will be subject to post Selection (SSS)# paragraph 3.8 to review. 3.11 of Consultant Guidelines Individual i) Competitive As per the Consultants Selection provisions of paragraph 5.1 to 5.6 of Consultant Guidelines ii) Single Source As per the Selection (SSS) provisions of paragraph 5.1 and 5.3 to 5.6 of Consultant Guidelines * If a transaction comprises several packages, lots or slices, the aggregate estimated value of contracts will determine the applicable threshold amount. # Irrespective of contract value any hiring of Government or Research Institutes of unique and exceptional nature requires prior no objection of the World Bank on case to case basis. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US $800,000 equivalent per 8 contract, may comprise entirely of national consultants in accordance with the provisions of Para 2.7 the World Bank Consultant Guidelines. 3. Any Other Special Selection Arrangements (Consulting Services) : (a) Contracts procured in advance will be financed under retroactive financing within the specified limits, as agreed to in the Credit Agreement provided procurement is in accordance with agreed processes and procedures for the project. (b) Requests for Expression of Interest (REOI) for assignments expected to cost more than US$ 300,000 shall be advertised in UNDB online in accordance with Para 2.5 of the Consultant Guidelines. With respect to each contract for the employment of individual consultants estimated to cost the equivalent of US $ 30,000 or more, the qualifications, experience, terms of reference and terms of employment of the consultants shall be furnished to the World Bank for its prior review and No Objection iv) Implementing Agency Capacity Building Activities with Time Schedule S. Expected outcome / Start Date Comments No. Activity Description 1 Training in World Bank To familiarise the online STEP system procurement official in Immediate regard to electronic submissions to the Bank. 2 Trainings in Bank To make procurement Within 3 Procurement at ASCI Officials from participating months of AU’s familiar with WB the procurement procedures negotiations 3 Customized training for Based on the learning from all selected official at PIU the project and hands on Within 3 and selected AU’s. experience a customized months of training to be conducted for effectiveness. strengthening the specific understanding for all IA. 9 PROCUREMENT India : National Agricultural Higher Education Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2019-12-24 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151072 GPN Date: 2016-12-16 Project Name: National Agricultural Higher Education Project Loan / Credit No: IBRD / 87760 V Executing Agency(ies): NMKV, Parbhani WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-VNMKV - PARBHANI- 146870-CW-RFQ / CIVIL Support to Agricultural Request for Single Stage - One 2020-07- WORKS IBRD / 87760 Post Limited 49,263.00 41,863.30 Signed 2020-02-10 2020-02-10 2020-04-06 2020-04-06 Universities Quotations Envelope 05 Minor Repair and renovation Work IN-VNMKV - PARBHANI- Under 181008-CW-RFQ / Civil Support to Agricultural Request for Single Stage - One 2021-05- IBRD / 87760 Post Limited 86,304.00 0.00 Implementat 2020-09-15 2020-12-01 Works (Minor Repair & Universities Quotations Envelope 30 ion Renovation Work) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-VNMKV - PARBHANI- Support to Agricultural 146161-GO-RFQ / Mobile IBRD / 87760 Post Direct Selection Direct 47,467.00 33,335.00 Completed 2020-02-05 2020-09-15 2020-02-10 2020-09-15 2020-03-16 2020-10-31 2020-09-12 2021-05-31 Universities Trainer Robot(Two No.) IN-VNMKV - PARBHANI- Support to Agricultural 146191-GO-DIR / BOOKS IBRD / 87760 Post Direct Selection Direct 11,168.00 9,791.36 Completed 2020-02-05 2020-02-05 2020-02-10 2020-02-10 2020-03-16 2020-02-28 2020-06-14 2020-10-19 Universities purchase IN-VNMKV - PARBHANI- 146176-GO-RFQ / CAD/CAM/CAE-Laboratory Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 62,044.00 52,805.00 Completed 2020-02-10 2020-02-10 2020-04-06 2020-04-03 2020-10-03 2020-05-30 Hardware and Software Universities Quotations Envelope Equipment: (Complete setup) ANSYS IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 146179-GO-RFQ / UAV(Three IBRD / 87760 Post Limited 10,703.00 9,066.75 Completed 2020-02-10 2020-02-10 2020-04-06 2020-04-01 2020-07-05 2020-08-30 Universities Quotations Envelope Nos) IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 146182-GO-RFQ / IBRD / 87760 Post Limited 18,770.00 17,621.08 Completed 2020-02-10 2020-09-15 2020-04-06 2020-12-05 2020-10-03 2021-01-12 Universities Quotations Envelope Refrigerated van (One No.) IN-VNMKV - PARBHANI- 146180-GO-RFQ / Cold Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 15,511.00 13,029.96 Completed 2020-02-10 2020-02-05 2020-04-06 2020-04-01 2020-10-03 2020-10-21 storage for green house Universities Quotations Envelope /polyhouses (One Nos) IN-VNMKV - PARBHANI- 146868-GO-RFQ / Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 15,511.00 13,362.61 Completed 2020-02-10 2020-02-10 2020-04-06 2020-03-01 2020-07-05 2020-07-20 COMPUTERS AND Universities Quotations Envelope PERIPHERALS IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 147962-GO-DIR / UAV IBRD / 87760 Post Limited 23,266.00 15,252.14 Signed 2020-02-10 2020-02-06 2020-04-06 2020-03-15 2020-07-05 Universities Quotations Envelope Trainer Lab IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 146865-GO-RFQ / IBRD / 87760 Post Limited 25,811.00 22,310.67 Completed 2020-01-03 2020-09-15 2020-03-20 2020-11-03 2020-09-16 2021-02-22 Universities Quotations Envelope FURNITURE AND FIXTURE IN-VNMKV - PARBHANI- 146187-GO-RFQ / Robotic manipulator (One No.) Support to Agricultural IBRD / 87760 Post Direct Selection Direct 54,289.00 48,236.44 Signed 2020-02-05 2020-02-05 2020-02-10 2020-02-10 2020-03-16 2020-03-16 2020-09-12 Plus Universities Robotic manipulator and end effector (One No.) IN-VNMKV - PARBHANI- 182447-GO-DIR / Self Support to Agricultural IBRD / 87760 Post Direct Selection Direct 30,526.00 18,034.89 Completed 2020-09-01 2020-09-01 2020-09-15 2020-09-15 2020-12-01 2021-03-15 2021-05-30 2021-03-30 Steering Autonomous Utility Universities Vehicle IN-VNMKV - PARBHANI- 178561-GO-RFQ / Mobile Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 16,038.00 15,105.90 Completed 2020-09-15 2020-09-15 2020-12-01 2020-12-05 2021-05-30 2021-02-22 Platforms for Agribots and Universities Quotations Envelope AGVs IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178570-GO-RFQ / Gator- IBRD / 87760 Post Limited 12,828.00 10,814.85 Completed 2020-09-15 2020-09-15 2020-12-01 2020-12-09 2021-05-30 2021-03-30 Universities Quotations Envelope type Agricultural Utility vehicles IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178677-GO-RFQ / Trucks IBRD / 87760 Post Limited 28,975.00 21,211.29 Completed 2020-09-15 2020-09-15 2020-12-01 2020-10-31 2021-05-30 2020-11-11 Universities Quotations Envelope and Trailers IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178678-GO-RFQ / Laser IBRD / 87760 Post Limited 10,703.00 9,380.35 Completed 2020-09-15 2020-09-15 2020-12-01 2020-12-17 2021-05-30 2021-02-24 Universities Quotations Envelope Scanner IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178693-GO-RFQ / Stereo IBRD / 87760 Post Limited 2,234.00 2,237.90 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-04 2021-05-30 2021-03-18 Universities Quotations Envelope Vision Cameras Page 1 IN-VNMKV - PARBHANI- Support to Agricultural Request for 178698-GO-RFQ / Real Sense IBRD / 87760 Post 2,327.00 1,253.94 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-04 2021-05-30 2020-12-05 Universities Quotations Cameras IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178701-GO-RFQ / Zed IBRD / 87760 Post Limited 2,327.00 2,670.24 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-04 2021-05-30 2020-12-14 Universities Quotations Envelope Cameras 2 Sensors IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178702-GO-RFQ / Various IBRD / 87760 Post Limited 3,257.00 2,756.53 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-02 2021-05-30 2021-02-03 Universities Quotations Envelope Industrial Grade CCD Cameras IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178711-GO-RFQ / IBRD / 87760 Post Limited 6,205.00 4,759.98 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-04 2021-05-30 2020-12-18 Universities Quotations Envelope Spectroradiometer IN-VNMKV - PARBHANI- 178714-GO-RFQ / Multi Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 20,940.00 18,945.19 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-03 2021-05-30 2021-01-07 Spectral (3, 4 and 5 band) Universities Quotations Envelope Imaging Systems IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 21,716.00 16,150.40 Signed 2020-09-15 2020-09-15 2020-12-01 2020-11-02 2021-05-30 178715-GO-RFQ / Sensors Universities Quotations Envelope IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178732-GO-RFQ / Agri-AGVs IBRD / 87760 Post Limited 15,511.00 12,668.65 Signed 2020-09-15 2020-09-15 2020-12-01 2020-11-04 2021-05-30 Universities Quotations Envelope Lab Training Workshops IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 182444-GO-RFQ / Agri Bots IBRD / 87760 Post Limited 29,471.00 25,829.95 Completed 2020-09-15 2020-09-15 2020-12-01 2020-12-17 2021-05-30 2021-03-12 Universities Quotations Envelope Technology Lab IN-VNMKV - PARBHANI- Under Support to Agricultural Request for Single Stage - One 182446-GO-RFQ / 3-D IBRD / 87760 Post Limited 62,044.00 0.00 Implementati 2020-09-15 2020-09-15 2020-12-01 2021-05-30 Universities Quotations Envelope Scanner on IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178738-GO-RFQ / IBRD / 87760 Post Limited 69,800.00 53,785.53 Signed 2020-09-15 2020-09-15 2020-11-12 2021-03-17 2021-05-11 Universities Quotations Envelope Mechatronics Lab Equipment IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 178740-GO-RFQ / Hydraulics IBRD / 87760 Post Limited 38,778.00 30,338.20 Signed 2020-09-15 2020-09-15 2020-12-01 2020-12-19 2021-05-30 Universities Quotations Envelope and Pneumatic Lab Equipment IN-VNMKV - PARBHANI- 181013-GO-RFQ / Equipment Needed to Design and Support to Agricultural Request for Single Stage - One IBRD / 87760 Post Limited 10,858.00 9,236.48 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-04 2021-05-30 2021-03-05 Fabricate Mechanical, Universities Quotations Envelope Hydraulic and Electrical Components IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 182392-GO-RFQ / Office IBRD / 87760 Post Limited 12,719.00 11,099.83 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-04 2021-05-30 2021-01-19 Universities Quotations Envelope Equipments IN-VNMKV - PARBHANI- Support to Agricultural Request for Single Stage - One 185980-GO-RFQ / Computer IBRD / 87760 Post Limited 14,224.00 12,325.32 Completed 2020-09-15 2020-09-15 2020-12-01 2020-11-02 2021-05-30 2021-01-11 Universities Quotations Envelope and Peripherals (Nos. 21) IN-VNMKV - PARBHANI- Support to Agricultural 185984-GO-DIR / Books and IBRD / 87760 Post Direct Selection Direct 14,580.00 12,742.63 Completed 2020-09-01 2020-09-01 2020-09-15 2020-09-15 2020-12-01 2020-10-31 2021-05-30 2021-03-18 Universities Journals Purchase NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-VNMKV - PARBHANI- 233645-CS-LCS / National Support to Agricultural Least Cost IBRD / 87760 Post Open - National 12,409.00 0.00 Under Review 2021-05-30 2021-05-29 2021-06-01 2021-06-11 2021-06-14 2021-06-17 2021-06-23 2021-06-29 2022-06-29 Consultancy Service Universities Selection (Accounting and Taxation) IN-VNMKV - PARBHANI- 227413-CS-LCS / National Support to Agricultural Least Cost IBRD / 87760 Post Open - National 15,511.00 0.00 Under Review 2021-06-13 2021-06-03 2021-06-15 2021-06-25 2021-06-28 2021-07-01 2021-07-07 2021-07-13 2022-07-13 Level Consultancy (Android Universities Selection Mobile Application) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-VNMKV - PARBHANI- Individual 148105-CS-CDS / WEBSITE Support to Agricultural IBRD / 87760 Post Consultant Limited 9,306.00 5,024.63 Completed 2020-02-05 2020-02-05 2020-02-10 2020-02-10 2020-03-02 2020-03-02 2020-04-06 2020-04-06 2020-10-03 2020-04-30 DESIGN and Portal Universities Selection Maintenance for 2Yrs Page 2 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: March 2017] 2. Date of General Procurement Notice: Sep 28, 2015 3. Period covered by this procurement plan: The procurement period of project covered from year March 2017 till April 2017. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 4 million All 2. NCB (Goods) Above US$ 4 million First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 2. Prequalification. Bidders for works activities shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank loan Project issued by The Council For Development and Reconstruction. 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) Review P-Q Expected Contract Proc. by Bank Ref. No. (Yes/No Bid Opening (Description) Method (Prior/Pos ) Date t) Expansion of sewage collection to QC1W1 ICB/NCB No Prior March 2017 connect to the Zahlé WWTP Expansion of sewage network to September QC1W2 ICB/NCB No Prior connect to the Anjar WWTP 2018 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2 million 2. Single Source (Firms) All 3. Individual Above US$ 400,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule Expected Review by Selection Proposals Ref. No. Description of Assignment Bank Method Submission (Prior/Post) Date Post Supervision of sewage collection to QC1C1 QCBS (Prior of March 2017 connect to the Zahlé WWTP TOR) Post Design of sewage network to connect to QC1C2 SSS (Prior of March 2017 the Anjar WWTP TOR) Post Supervision of sewage network to December QC1C3 QCBS (Prior of connect to the Anjar WWTP 2018 TOR) Post Design and supervision of sewage September QC1C4 QCBS (Prior of network to connect to the Aitanit WWTP 2017 TOR) SSS QC2C1 Promote the use of GAP, including IPM Prior March 2017 (FAO) Post Technical studies and training in solid September QC3C1 QCBS (Prior of waste management - MoE 2017 TOR) Post QC3C2 Water expert- LRA IC (Prior of TOR) Post QC3C3 Communication expert - LRA IC (Prior of TOR) Post QC3C6 Capacity building and training BWE (Prior of TOR) Post QC3C8 Capacity building and training of MoEW (Prior of TOR) PMU and training (part-time procurement; Prior of QC3C11 part-time environmental/social; part time IC TORs FM) Post QC3C12 Audit report LCS (Prior of February 2016 TOR) PROCUREMENT Lebanon : Lake Qaraoun Pollution Prevention Project PLAN General Information Country: Lebanon Bank’s Approval Date of the Original Procurement Plan: 2017-03-27 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147854 GPN Date: Project Name: Lake Qaraoun Pollution Prevention Project Loan / Credit No: IBRD / 86370 Council for Development and Reconstruction Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1W1 / Expansion of Component 1: Improvement Single Stage - One 10,539,562. 2020-03- sewage collection to connect IBRD / 86370 of Municipal Sewage Prior Request for Bids Open - International Signed 2017-03-27 2017-03-31 2017-03-29 2017-06-02 2017-06-02 2017-08-01 2017-10-04 2017-09-15 2017-10-13 Envelope 49 15 to the Zahlé WWTP Collection QC1W2 / Expansion of Component 1: Improvement Under Single Stage - One 2022-12- sewage network to connect to IBRD / 86370 of Municipal Sewage Prior Request for Bids Open - International 0.00 Implementat 2018-08-30 2020-12-01 2018-09-29 2021-01-08 2018-12-28 2021-02-18 2019-03-28 2019-06-11 Envelope 10 the Anjar WWTP Collection ion QC1W3 / Expansion of Component 1: Improvement Single Stage - One 2,522,112.6 2020-12- sewage network to connect to IBRD / 86370 of Municipal Sewage Post Request for Bids Open - National Signed 2018-04-16 2018-05-10 2018-05-16 2018-05-31 2018-06-30 2018-07-31 2018-09-28 2019-05-30 2018-12-12 2019-12-09 Envelope 2 11 the Aitanit WWTP Collection QC1W2A / Expansion of the Request for Wastewater Collection Component 1: Improvement Bids - Works Networks (Anjar, Majdel Anjar Single Stage - One 2023-06- IBRD / 86370 of Municipal Sewage Prior Request for Bids Open - International (without 0.00 Canceled 2021-06-03 2021-06-10 2021-09-09 2021-11-04 2021-12-16 & Qabb Elias) to Connect to Envelope 15 Collection prequalificati Anjar El Marj Wastewater on) SPD Treatment Plant – Lot 1 QC1W2B / Expansion of the Request for Wastewater Collection Component 1: Improvement Bids - Works Pending Networks (Anjar, Majdel Anjar Single Stage - One 2023-06- IBRD / 86370 of Municipal Sewage Prior Request for Bids Open - International (without 0.00 Implementat 2021-06-10 2021-06-17 2021-09-16 2021-11-11 2021-12-30 & Qabb Elias) to Connect to Envelope 29 Collection prequalificati ion Anjar El Marj Wastewater on) SPD Treatment Plant – Lot 1 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3. Solid Waste Under QC3G1 / Purchase of water Management, Water Quality IBRD / 86370 Post Direct Selection Direct 0.00 Implementati 2018-07-18 2019-05-27 2018-07-23 2018-10-06 2019-04-04 monitoring stations Monitoring, Capacity Building on and Project Management NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1C1 / Supervision of Component 1: Improvement Quality And Cost- sewage collection to connect IBRD / 86370 of Municipal Sewage Post Open - International 378,622.27 Signed 2016-10-28 2016-10-28 2016-12-08 2017-05-02 2017-07-31 2017-07-01 2017-09-14 2017-07-31 2017-11-13 2017-09-09 2018-01-03 2017-11-23 2018-03-26 2021-05-24 Based Selection to the Zahlé WWTP Collection Component 2. Promotion of QC2C1 / Promote the use of Good Agricultural Practices UN Agencies IBRD / 86370 Prior Direct 1,500,000.00 Under Review 2017-06-08 2017-06-09 2021-06-08 GAP, including IPM (Including Integrated Pest (Direct) Management) QC1C3 / Supervision of Component 1: Improvement Quality And Cost- Under sewage network to connect to IBRD / 86370 of Municipal Sewage Prior Open - International 0.00 2018-08-30 2019-11-06 2018-09-29 2020-01-15 2019-01-27 2020-11-11 2019-02-26 2021-02-12 2019-03-28 2021-04-08 2019-05-27 2019-08-10 2023-02-08 Based Selection Implementation the Anjar WWTP Collection Component 3. Solid Waste QC3C1A / Studies for Closure Management, Water Quality Quality And Cost- and Rehabilitation of Bar Elias IBRD / 86370 Post Open - National 67,237.25 Signed 2018-08-02 2019-06-06 2018-08-02 2018-08-02 2019-12-16 2019-05-03 2020-02-03 2019-05-31 2020-06-17 2019-07-12 2020-07-22 2019-08-30 2020-11-09 2020-06-30 Monitoring, Capacity Building Based Selection Dumpsite and Project Management QC3C1B / Studies for the Component 3. Solid Waste Assessment of Odor Impact Management, Water Quality Quality And Cost- IBRD / 86370 Post Open - International 72,944.54 Signed 2018-08-02 2018-08-02 2018-08-02 2019-06-10 2018-08-02 2019-12-16 2019-05-31 2020-02-19 2019-06-28 2020-06-17 2019-08-09 2020-07-29 2019-09-27 2021-04-09 2020-05-29 from Solid Waste Management Monitoring, Capacity Building Based Selection Facilities and Landfills and Project Management Component 3. Solid Waste QC3C2 / LRA Water Management, Water Quality Quality And Cost- IBRD / 86370 Post Open - International 0.00 Canceled 2018-08-02 2018-06-30 2018-08-02 2019-05-03 2018-08-02 2019-10-11 2019-04-15 2020-02-18 2019-05-13 2019-06-24 2019-08-12 2021-02-15 Governance Study Monitoring, Capacity Building Based Selection and Project Management QC3C12 / Website for Litani Component 3. Solid Waste River (20 weeks) + 1-year Management, Water Quality Quality And Cost- IBRD / 86370 Post Open - National 63,314.50 Signed 2018-08-30 2018-09-05 2018-08-30 2018-08-30 2019-01-17 2019-03-07 2019-03-07 2019-04-04 2019-03-28 2019-05-16 2019-06-11 2019-07-04 2019-10-17 2022-07-04 Maintenance + 3-year Monitoring, Capacity Building Based Selection Hosting and Project Management QC1C4B / Supervision of Component 1: Improvement Quality And Cost- sewage network to connect to IBRD / 86370 of Municipal Sewage Post Open - National 62,344.00 Signed 2018-04-16 2019-04-16 2018-12-28 2019-04-18 2019-05-02 2019-05-16 2019-05-24 2019-06-13 2019-07-17 2019-07-04 2019-11-27 2019-08-01 2020-03-02 2020-07-31 Based Selection the Aitanit WWTP Collection Page 1 QC3C1C / Strategic Component 3. Solid Waste Environmental and Social Management, Water Quality Quality And Cost- Under Assessment Study for the IBRD / 86370 Post Open - International 104,925.00 2019-09-19 2019-07-04 2019-10-31 2020-04-23 2019-12-26 2020-12-11 2020-02-20 2021-02-16 2020-03-19 2021-03-11 2020-04-23 2021-04-22 2020-06-01 2021-03-31 Monitoring, Capacity Building Based Selection Implementation National Integrated Solid and Project Management Waste Strategy Component 3. Solid Waste QC3C7B / Upgrading IT Management, Water Quality Quality And Cost- Under IBRD / 86370 Post Open - National 0.00 2020-06-16 2020-09-29 2020-07-14 2021-02-25 2020-08-11 2020-09-08 2020-09-29 2020-10-20 2020-12-01 2021-05-31 System - BWE Monitoring, Capacity Building Based Selection Implementation and Project Management INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1C2 / Design of sewage Component 1: Improvement network to connect to the IBRD / 86370 of Municipal Sewage Post Direct Selection Direct 392,500.00 Signed 2017-03-22 2017-03-22 2017-06-30 2017-06-29 2017-09-03 2017-10-09 2018-07-04 Anjar WWTP Collection Component 3. Solid Waste Individual QC3C5A / Administration Management, Water Quality IBRD / 86370 Prior Consultant Direct 253,304.25 Signed 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-07-01 2016-07-01 2017-06-30 Officer– BWE Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual Management, Water Quality QC3C5B / Assistant– BWE IBRD / 86370 Post Consultant Direct 37,479.72 Completed 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-07-01 2016-07-01 2017-06-30 2019-06-30 Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C9 / Solid waste expert - Management, Water Quality IBRD / 86370 Post Consultant Open 132,000.00 Signed 2016-11-14 2016-11-14 2017-03-23 2017-03-23 2017-03-23 2017-03-23 2017-06-06 2017-06-06 2018-05-04 MOE Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C10 / Project Management, Water Quality IBRD / 86370 Prior Consultant Open 277,860.00 Signed 2015-08-06 2015-08-06 2015-11-25 2015-11-25 2015-11-25 2015-11-25 2017-07-06 2016-11-01 2018-06-04 management– CDR Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C4 / Wastewater Management, Water Quality Under IBRD / 86370 Post Consultant Open 38,500.00 2016-12-28 2016-12-28 2017-06-30 2017-06-09 2017-07-15 2017-09-03 2018-08-02 engineer - BWE Monitoring, Capacity Building Implementation Selection and Project Management Component 3. Solid Waste Individual QC3C7 / Financial officer - Management, Water Quality IBRD / 86370 Post Consultant Open 0.00 Canceled 2016-12-28 2017-06-08 2017-07-08 2017-08-12 2018-07-11 BWE Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C7A / Financial Officer - Management, Water Quality IBRD / 86370 Post Consultant Open 167,200.00 Signed 2017-08-02 2017-08-02 2017-11-13 2017-11-13 2017-11-23 2017-11-23 2018-02-06 2018-02-01 2019-01-05 BWE Monitoring, Capacity Building Selection and Project Management Component 1: Improvement QC1C5 / ESMP/LAP Anjar and IBRD / 86370 of Municipal Sewage Post Direct Selection Direct 66,383.00 Signed 2017-04-21 2017-04-21 2017-06-05 2017-05-01 2017-09-07 2017-09-29 2018-05-05 Aitanit Collection Component 3. Solid Waste Individual QC3C11A / Financial Officer Management, Water Quality IBRD / 86370 Post Consultant Direct 149,450.40 Signed 2017-09-13 2017-09-13 2017-09-13 2017-09-13 2017-09-13 2017-11-03 2017-11-15 2018-10-02 - CDR Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C11B / Procurement Management, Water Quality IBRD / 86370 Post Consultant Open 122,760.00 Signed 2017-12-14 2017-12-14 2018-03-14 2018-04-30 2018-04-04 2018-07-02 2018-06-18 2018-07-02 2019-05-19 Officer Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste QC3C1 / Lower Litani Management, Water Quality Environment and Investment IBRD / 86370 Post Direct Selection Direct 196,000.00 Completed 2017-05-04 2017-05-04 2017-09-05 2017-09-05 2018-01-19 2018-02-12 2019-01-14 2019-03-15 Monitoring, Capacity Building Plan - MoE and Project Management QC1C4A / Design of sewage Component 1: Improvement network to connect to the IBRD / 86370 of Municipal Sewage Post Direct Selection Direct 17,560.00 Completed 2018-05-10 2018-05-10 2018-04-12 2018-11-07 2018-11-07 2018-12-07 2018-12-06 Aitanit WWTP Collection Component 3. Solid Waste QC3C6B / Individual Individual Management, Water Quality Under Consultant Wastewater Sector IBRD / 86370 Post Consultant Open 0.00 2018-06-10 2019-04-10 2019-06-07 2020-02-20 2019-06-28 2019-08-16 2020-07-15 Monitoring, Capacity Building Implementation - MOEW Selection and Project Management Component 3. Solid Waste Individual QC3C11C / Environmental Management, Water Quality IBRD / 86370 Post Consultant Open 111,840.00 Signed 2018-06-10 2018-05-22 2018-10-11 2018-08-16 2018-10-25 2018-12-26 2018-12-26 2018-12-26 2019-09-30 and Social Officer - CDR Monitoring, Capacity Building Selection and Project Management Component 3. Solid Waste Individual QC3C11D / Project Engineer Management, Water Quality IBRD / 86370 Post Consultant Open 79,200.00 Signed 2018-11-30 2018-11-30 2019-06-07 2019-09-17 2019-06-28 2019-09-19 2019-08-16 2019-11-26 2020-07-15 - CDR Monitoring, Capacity Building Selection and Project Management QC1C4 / Supervision of Component 1: Improvement sewage network to connect to IBRD / 86370 of Municipal Sewage Post Direct Selection Direct 0.00 Canceled 2018-04-16 2018-05-06 2018-08-19 2020-12-11 the Aitanit WWTP Collection QC3C13 / Consultancy Services for the Preparation of Component 3. Solid Waste a Feasibility Study for Management, Water Quality IBRD / 86370 Post Direct Selection Direct 104,294.80 Signed 2019-01-08 2020-01-24 2019-10-01 2020-01-22 2019-12-31 2020-08-25 2020-05-30 Sustainable Sludge Monitoring, Capacity Building Management in the Bekaa and Project Management Region Component 3. Solid Waste QC3C6A / Focal Point - Management, Water Quality IBRD / 86370 Post Direct Selection Direct 99,000.00 Signed 2019-07-17 2019-07-30 2019-07-30 2019-07-25 2019-10-01 2020-03-02 2020-08-31 MoEW Monitoring, Capacity Building and Project Management Page 2 Component 3. Solid Waste QC3C11E / Rockwise PMIS Management, Water Quality IBRD / 86370 Post Direct Selection Direct 20,497.50 Signed 2020-01-01 2020-01-17 2020-01-21 2020-01-21 2020-03-10 2020-03-10 2020-12-31 Software Maintenance - CDR Monitoring, Capacity Building and Project Management QC3C6C / Updating the Component 3. Solid Waste Strategic Environmental and Management, Water Quality Under Social Assessment (SESA) of IBRD / 86370 Post Direct Selection Direct 99,973.00 2020-12-10 2021-01-28 2020-12-24 2021-03-17 2021-03-04 2021-12-03 Monitoring, Capacity Building Implementation the Updated National Water and Project Management Sector Strategy - MoEW Component 3. Solid Waste Individual QC3C11F / Environmental Management, Water Quality Under IBRD / 86370 Post Consultant Open 0.00 2020-12-10 2020-12-01 2021-02-04 2021-02-18 2021-04-01 2022-02-28 and Social Officer - CDR Monitoring, Capacity Building Implementation Selection and Project Management Component 3. Solid Waste Individual QC3C9A / Solid Waste Expert Management, Water Quality IBRD / 86370 Post Consultant Open 3,900.00 Signed 2020-12-10 2020-12-01 2021-02-04 2021-03-01 2021-02-18 2021-03-11 2021-04-01 2021-05-17 2022-02-28 - MoE Monitoring, Capacity Building Selection and Project Management Page 3 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: Mar 2017] 2. Date of General Procurement Notice: NA 3. Period covered by this procurement plan: The procurement period of project covered from March 2017 to December 2017. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 3,000,000 All 2. NCB (Goods) Above US$ 200,000 First contract 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) Above US$ 300,000 All 5. (Non-Consultant Services) Below US$ 100,000 First contract 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued by 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [Refer to Procurement Plan] III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1,000,000 2. Single Source (Firms) All 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule [Refer to Procurement Plan] PROCUREMENT Tunisia : Tunisia Tertiary Education for Employability Project PLAN General Information Country: Tunisia Bank’s Approval Date of the Original Procurement Plan: 2017-03-28 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151059 GPN Date: 2017-03-30 Project Name: Tunisia Tertiary Education for Employability Project Loan / Credit No: IBRD / 85900 U Executing Agency(ies): GP Modernisation de l'enseignement suprieur en soutien à l'employabilité WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1123167 2017 / Acquisition Pending de Malette de ressources Improving employability of Single Stage - One IBRD / 85900 Post Request for Bids Open - National 227,272.73 0.00 Implementati 2019-09-20 2019-09-25 2019-11-06 2019-12-06 2020-01-10 2020-07-08 pédagogiques innovantes tertiary education graduates Envelope on (2019) 4322165 / Équipement Strengthening the Pending Single Stage - One informatique pour unité de IBRD / 85900 management of higher Post Request for Bids Open - National 63,636.36 0.00 Implementati 2018-04-10 2018-04-15 2018-05-27 2018-06-26 2018-07-31 2019-01-27 Envelope gestion education on CF 17/2020 / Acquisition du Strengthening the Request for Single Stage - One matériel informatique pour IBRD / 85900 management of higher Post Limited 27,000.00 25,258.99 Signed 2021-04-13 2020-08-28 2021-06-08 2020-12-15 2021-12-05 Quotations Envelope l'UGP PROMESSE education NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AON 1 / 2017 / Ateliers, Pending Improving employability of Single Stage - One séminaires et formations IBRD / 85900 Post Request for Bids Open - National 681,818.00 0.00 Implementati 2017-04-25 2017-04-30 2017-06-11 2017-07-11 2017-08-15 2018-02-11 tertiary education graduates Envelope actions de l'année 2017 on CF 1 / 2017 / Atelier Under d'information et de Improving employability of Request for Single Stage - One IBRD / 85900 Post Limited 4,545.00 0.00 Implementati 2017-01-08 2017-07-11 2017-03-05 2017-09-01 communication PAQ (janvier tertiary education graduates Quotations Envelope on 2017) CF 2 / 2017 / Atelier Pending d'information et de Improving employability of Request for Single Stage - One IBRD / 85900 Post Limited 4,545.00 0.00 Implementati 2017-02-06 2017-04-03 2017-09-30 communication PAQ février tertiary education graduates Quotations Envelope on 2017) CF 3 / 2017 / Atelier d'information et de Improving employability of Request for Single Stage - One IBRD / 85900 Post Limited 4,545.00 1,049.11 Signed 2017-03-08 2020-01-07 2017-05-03 2020-01-10 2017-10-30 communication PAQ (mars tertiary education graduates Quotations Envelope 2017) CF 4 / 2017 / Atelier Pending d'information et de Improving employability of Request for Single Stage - One IBRD / 85900 Post Limited 4,545.00 0.00 Implementati 2017-04-08 2017-06-03 2017-11-30 communication PAQ (Avril tertiary education graduates Quotations Envelope on 2017) CF 5 / 2017 / Atelier Pending d'information et de Improving employability of Request for Single Stage - One IBRD / 85900 Post Limited 4,545.00 0.00 Implementati 2017-05-06 2017-07-01 2017-12-28 communication PAQ (Mai tertiary education graduates Quotations Envelope on 2017) CF 6 / 2017 / Atelier Pending d'information et de Improving employability of Request for Single Stage - One IBRD / 85900 Post Limited 4,545.00 0.00 Implementati 2017-06-08 2017-08-03 2018-01-30 communication PAQ (Juin tertiary education graduates Quotations Envelope on 2017) AON 1 / 2021 / Ateliers, Pending Improving employability of Single Stage - One séminaires et formations IBRD / 85900 Post Request for Bids Open - National 658,055.00 0.00 Implementati 2021-01-08 2021-01-13 2021-02-24 2021-03-26 2021-04-30 2021-10-27 tertiary education graduates Envelope actions de l'année 2021 on AON 1 / 2018 / Ateliers, Improving employability of Request for Single Stage - One séminaires et formations IBRD / 85900 Post Open - National 1,000,000.00 0.00 Canceled 2018-01-13 2018-03-10 2018-09-06 tertiary education graduates Quotations Envelope actions de l'année 2018 AON 1 / 2020 / Ateliers, Improving employability of Single Stage - One séminaires et formations IBRD / 85900 Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2020-04-07 2020-04-12 2020-05-24 2020-06-23 2020-07-28 2021-01-24 tertiary education graduates Envelope actions de l'année 2020 AON 1 / 2019 / Ateliers, Improving employability of Single Stage - One séminaires et formations IBRD / 85900 Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-10-27 tertiary education graduates Envelope actions de l'année 2019 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Page 1 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PROMESSE GG ATN 11 / Strengthening the Individual Pending Rémunération Personnel IBRD / 85900 management of higher Post Consultant Open 98,182.00 0.00 2017-03-31 2017-05-19 2017-06-09 2017-07-14 2018-01-10 Implementation d'appui (UGP) education Selection PROMESSE RI ATN 7 / ATN 7 : - Phase préparatoire du PARI (autoévaluation et analyse des besoins) Strengthening the Individual (Autoévaluation et analyse des Pending IBRD / 85900 management of higher Post Consultant Open 150,000.00 0.00 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-12-30 besoins des CR Implementation education Selection (1 consultant /CR pendant 10 à 15 jours pour accompagnement du processus )) PROMESSE GG ATN 7 / Recrut Strengthening the Individual er un personnel d'appui pour : Under IBRD / 85900 management of higher Post Consultant Open 21,818.00 0.00 2017-03-30 2017-05-18 2017-06-08 2017-07-13 2018-01-09 · développer un plan de com Implementation education Selection munication et l'exécute PROMESSE FE ATN 1 / Mise en oeuvre, monitoring sous composantes pour les Strengthening the Individual résultats R2, R3, R4, R5, et... IBRD / 85900 management of higher Post Consultant Open 16,364.00 6,970.05 Signed 2017-03-20 2018-03-08 2017-05-08 2018-05-25 2017-05-29 2018-06-08 2017-07-03 2018-10-05 2020-06-17 relevant de la DGRU education Selection (Appui à la conception, la mise en oeuvre et le suivi- évaluation des activités) PROMESSE GG ATN 9-1 / ATN Coordonnateurs des mesures Strengthening the Individual incitatives (PAQ) pour une IBRD / 85900 management of higher Post Consultant Open 14,730.00 25,602.59 Signed 2017-03-30 2017-03-23 2017-05-18 2017-09-04 2017-06-08 2017-09-07 2017-07-13 2017-12-21 2020-06-27 meilleurs connexion au education Selection marché de travail PROMESSE GG ATN 10-1 / Strengthening the Individual ATN Coordonateur des Under IBRD / 85900 management of higher Post Consultant Open 14,727.00 0.00 2017-03-30 2017-05-18 2017-06-08 2017-07-13 2018-01-09 mesures d'appui structurelles Implementation education Selection en soutien à l'employabilité PROMESSE GG ATN 10-2 / ATN Coordonateur des Individual Improving employability of Under mesures d'appui structurelles IBRD / 85900 Post Consultant Open 14,727.00 0.00 2017-03-30 2017-05-18 2017-06-08 2017-07-13 2018-01-09 tertiary education graduates Implementation afin d'améliorer la Selection gouvernance et la gestion PROMESSE GG ATN 9-2 / Assistance technique- Individual Improving employability of coordination du volet PAQ IBRD / 85900 Post Consultant Open 14,730.00 13,776.63 Signed 2017-03-30 2018-03-01 2017-05-18 2018-04-17 2017-06-08 2018-04-24 2017-07-13 2018-10-05 2018-01-09 tertiary education graduates pour une université innovante Selection et entrepreneuriale PROMESSE GG ATN 9-3 / Assistance technique- Individual Improving employability of Under coordination volet PAQ pour IBRD / 85900 Post Consultant Open 14,730.00 0.00 2017-03-30 2017-05-18 2017-06-08 2017-07-13 2018-01-09 tertiary education graduates Implementation l'amélioration des services Selection aux étudiants PROMESSE GG ATN 9-4 / Assistance technique - Individual Improving employability of Under coordination du volet PAQ IBRD / 85900 Post Consultant Open 14,730.00 0.00 2017-03-30 2017-05-18 2017-06-08 2017-07-13 2018-01-09 tertiary education graduates Implementation pour soutenir la gouvernance Selection et la capacité de gestion PROMESSE GG ATN 9-5 / Assistance technique - Individual Improving employability of Under coordinateur volet PAQ appui IBRD / 85900 Post Consultant Open 14,730.00 0.00 2017-03-30 2017-05-18 2017-08-09 2017-06-08 2017-07-13 2018-01-09 tertiary education graduates Implementation à l'assurance qualité et Selection accréditation PROMESSE GG ATN 12 / ATN Strengthening the Individual Under recrutement de spécialiste en IBRD / 85900 management of higher Post Consultant Open 16,364.00 0.00 2017-05-31 2017-06-28 2017-07-19 2017-11-01 2017-08-09 2018-02-22 2017-09-13 2020-08-28 Implementation passation des marchés education Selection PROMESSE RI ATN 19 / ATN Individual Improving employability of Pending Coordonateur Pôle Recherche IBRD / 85900 Post Consultant Open 16,364.00 0.00 2018-04-30 2018-06-18 2018-07-09 2018-08-13 2021-07-28 tertiary education graduates Implementation & Innovation Selection PROMESSE GG ATN 8 / ATN Individual Improving employability of Pending Coordonateur Pôle IBRD / 85900 Post Consultant Open 16,364.00 0.00 2018-04-30 2018-06-18 2018-07-09 2018-08-13 2020-02-04 tertiary education graduates Implementation Gouvernance et Gestion Selection Page 2 Procurement Plan I. General 1. Project Information Country : Bhutan Borrower : Project Name : Food Security and Agriculture Productivity Project Loan Credit No. : P 1555513 2. Bank’s Approval Date of the Procurement Plan : October 20, 2016 In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. II. Goods, Works and Non consulting Services 1. Prior Review Threshold Method of Thresholds for Method Prior Review Procurement (USD equivalent) Threshold (USD) ICB (Goods) > 200,000 USD All contract above USD 100,000 RFB ( Goods) > USD 30,000 and up to USD 200,000 RFQ (Goods) Up to USD 30,000 ICB (Works) > 1.5 million All contract above RFB (Works) > 50,000 and up to USD USD 300,000 1.5 million RFQ (Works) Up to USD 50,000 ICB (Non- > 200,000 USD All contract above Consulting USD 100,000 Services) RFB (Non- < 200,000 USD Consulting Services) Direct Contracting No Threshold; meet paragraph 6.8, 6.9 and 6.10 of regulations Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified depending on the risk assessment and implementation of mitigation measures. In the case of contracts subject to prior review, before granting / agreeing to (a) a material extension of the stipulated time for performance of a contract; or (b) any substantial modification or waiver of the scope of services or other significant changes to the terms and conditions of such that the contract, including issuing; or (c) any change variation order or orders under such contract amendment (except in cases of extreme urgency) which would in aggregate, singly or combined with all variation orders or amendments previously issued, increase the original contract amount of the contract by more than 15% (fifteen percent); or (d) the proposed termination of the original price contract, the Borrower shall seek the Bank’s no objection to the proposed extension, modification, or change order. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable 3. Reference to Project operational/Procurement Manual Standard Bidding Documents agreed between Project and Bank will be used for all works, consultancy and goods procurements. 4. Any Other Special Procurement Arrangements: National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process.. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. II. Domestic Preference. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable The bid evaluation will be carried out as per agreed timeline in the Procurement Activity Schedule III. Selection of Consultant 1. Prior Review Threshold Method of Threshold (USD Prior Review Threshold Procurement Equivalent) (a) Quality and Cost No threshold All Contracts above USD Based Selection 70,000 for Firms; and (b) Quality Based No threshold above USD 50,000 for Selection Individuals (c) Selection Made No threshold Under a Fixed Budget (d) Least Cost Selection No threshold (e) Selection Based on < 100,000 Consultant’s Qualifications (f) Single Source As per Consultant Selection of firms Guidelines Para 3.9 (g) Selection of No threshold Individual Consultants Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 200,000 equivalent per contract, may comprise entirely of national consultants. PROCUREMENT Bhutan : Food Security and Agriculture Productivity Project PLAN General Information Country: Bhutan Bank’s Approval Date of the Original Procurement Plan: 2016-07-31 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155513 GPN Date: 2017-11-30 Project Name: Food Security and Agriculture Productivity Project Loan / Credit No: / , TF / A4224 P Executing Agency(ies): olicy and Planning Division, Ministry of Agriculture and Forests WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 1:Strengthening Request for Single Stage - One 2017-08- CW3 / Micro irrigation / Post Open - National 50,000.00 0.00 Canceled 2017-01-06 2017-03-03 Farmer and Producer Groups Quotations Envelope 30 CW6 / Birkulo-Somlachen Component 1:Strengthening Request for Single Stage - One 2019-02- Irrigation Scheme, / Prior Open - National 130,000.00 0.00 Canceled 2017-01-31 2017-04-18 2017-04-18 2017-02-05 2017-06-27 2017-07-27 2017-08-31 Farmer and Producer Groups Proposals Envelope 22 Dophuchen, Samtse CW5 / Support to NSC Bhur- Under Component 1:Strengthening Request for Single Stage - One 2017-09- Cardamom (propagation / Post Open - National 15,000.00 0.00 Implementat 2017-02-05 2017-04-02 Farmer and Producer Groups Quotations Envelope 29 house) ion CW4 / Construction of Farm Component 1:Strengthening Request for Single Stage - One 2017-09- / Post Open - National 20,000.00 0.00 Canceled 2017-02-05 2017-04-02 Shop Farmer and Producer Groups Quotations Envelope 29 CW2 / Taray Khola Irrigation Component 1:Strengthening Request for Single Stage - One 2019-02- / Prior Open - National 721,000.00 0.00 Canceled 2017-01-31 2017-04-18 2017-04-18 2017-02-05 2017-06-27 2017-07-27 2017-08-31 Scheme,Norbugang, Samtse Farmer and Producer Groups Proposals Envelope 22 BT-MOAF-37539-CW-RFB / Component 2: Enhancing Single Stage - One 2018-09- Construction of Taraykhola TF / A4224 Post Request for Bids Open - National 63,000.00 536,844.52 Completed 2017-11-27 2018-03-30 2017-12-02 2018-06-14 2018-01-13 2018-05-03 2018-02-12 2018-06-13 2018-03-19 2018-07-09 Farmer Productivity Envelope 15 channel at Samtse BT-MOAF-48857-CW-RFB / Component 2: Enhancing Single Stage - One 2019-01- Construction of Laringkhola TF / A4224 Post Request for Bids Open - National 692,000.00 655,642.35 Completed 2018-04-09 2018-03-30 2018-04-14 2018-06-14 2018-05-26 2018-05-03 2018-06-25 2018-06-13 2018-07-30 2018-07-09 Farmer Productivity Envelope 26 Irrigation Scheme at Sarpang CW1 / Ratey Khola Irrigation Component 2: Enhancing Single Stage - One 2018-12- TF / A4224 Post Request for Bids Open - National 540,000.00 468,478.19 Completed 2018-03-06 2018-03-22 2018-03-11 2018-06-14 2018-04-22 2018-04-25 2018-05-22 2018-06-01 2018-06-26 2018-07-09 Scheme, Sarpang Farmer Productivity Envelope 23 BT-MOAF-59359-CW-RFB / Construction of Irrigation Component 2: Enhancing Single Stage - One 2019-02- Scheme at Birkhola under TF / A4224 Post Request for Bids Open - National 150,000.00 247,838.63 Completed 2018-04-16 2018-03-30 2018-04-21 2018-06-05 2018-06-02 2018-05-03 2018-07-02 2018-06-13 2018-08-06 2018-07-05 Farmer Productivity Envelope 02 Dophuchen Gewog, Samtse Dzongkhag BT-MOAF-65700-CW-RFB / Construction/Installation of Component 2: Enhancing Request for Single Stage - One 2019-02- TF / A4224 Post Open - National 23,000.00 23,349.69 Completed 2018-06-27 2018-06-23 2018-08-22 2018-05-18 Cardamom House at Farmer Productivity Quotations Envelope 18 Samtenling, Sarpang BT-MOAF-77364-CW-RFQ / Construction of Water Harvesting Tank for Demonstration for demonstration. This plan is Component 2: Enhancing Request for Single Stage - One 2019-05- TF / A4224 Post Open - National 3,500.00 3,078.90 Completed 2018-09-26 2018-11-21 2018-07-10 already approved (plan Farmer Productivity Quotations Envelope 20 no.43631) and this additional plan is submitted in order to update all the procurement activities in the STEP System BT-MOAF-99202-CW-RFQ / Construction of of water harvesting tank for Component 2: Enhancing Request for Single Stage - One 2019-10- TF / A4224 Post Limited 3,300.00 0.00 Canceled 2019-03-05 2019-04-30 demonstration in Tendu Farmer Productivity Quotations Envelope 27 Gewog under Samtse Dzongkhag. BT-MOAF-93461-CW-RFB / Construction of Barbed Wire Component 2: Enhancing Request for Single Stage - One 2019-11- TF / A4224 Post Open - National 9,000.00 0.00 Canceled 2019-04-07 2019-06-02 Fencing and Steel Gate at Farmer Productivity Quotations Envelope 29 Sangbaykha, Haa Dzongkhag. BT-MOAF-104515-CW-RFQ / Construction of Road side Pending Market Shed and Toilet at Component 3: Enhancing Request for Single Stage - One 2019-11- TF / A4224 Post Limited 9,200.00 0.00 Implementat 2019-04-06 2019-06-01 Delheling, Sangacholing Access to Markets Quotations Envelope 28 ion Gewog under Samtse Dzongkhag. BT-MOAF-104519-CW-RFQ / Pending Construction of Button Component 2: Enhancing Request for Single Stage - One 2019-11- TF / A4224 Post Open - National 15,500.00 0.00 Implementat 2019-04-06 2019-06-01 Mushroom Shed under Farmer Productivity Quotations Envelope 28 ion Chhukha Dzongkhag. BT-MOAF-130539-CW-RFB / Component 3: Enhancing Single Stage - One 2020-10- Construction of Farmers TF / A4224 Post Request for Bids Open - National 40,300.00 26,727.83 Signed 2020-01-09 2020-01-06 2020-01-14 2020-02-25 2020-02-10 2020-03-26 2020-03-09 2020-04-30 2020-04-02 Access to Markets Envelope 27 outlet at Samtse Dzongkhag. BT-MOAF-130541-CW-RFQ / Construction of Marketing Component 3: Enhancing Request for Single Stage - One 2020-08- Structures at Dophuchen TF / A4224 Post Open - National 12,000.00 13,477.59 Completed 2019-12-30 2020-02-24 2020-03-30 Access to Markets Quotations Envelope 22 Gewog, Dorokha Drungkhag, Samtse Dzongkhag BT-MOAF-133413-CW-RFB / Pending Construction of Farmers Component 3: Enhancing Single Stage - One 2020-09- TF / A4224 Post Request for Bids Open - National 82,000.00 0.00 Implementat 2019-12-03 2019-12-08 2020-01-19 2020-02-18 2020-03-24 outlet at Samar Gewog under Access to Markets Envelope 20 ion Haa Dzongkhag. Page 1 BT-MOAF-133608-CW-RFB / Construction of Farmer outlet Component 3: Enhancing Single Stage - One 2020-09- TF / A4224 Post Request for Bids Open - National 81,000.00 80,656.00 Signed 2019-12-03 2020-01-08 2019-12-08 2020-01-19 2020-02-10 2020-02-18 2020-03-16 2020-03-24 2020-07-01 at Gedu under Chhukha Access to Markets Envelope 20 Dzongkhag. BT-MOAF-134027-CW-RFB / Construction of Farmers Component 3: Enhancing Single Stage - One 2020-10- outlet at Dagapela under TF / A4224 Post Request for Bids Open - National 46,686.00 34,794.08 Completed 2019-12-25 2020-02-28 2019-12-30 2020-02-10 2020-03-03 2020-03-11 2020-04-06 2020-04-15 2020-04-27 Access to Markets Envelope 12 Goshi Gewog, Dagana Dzomngkhag. BT-MOAF-134124-CW-RFB / Construction of farmer oulet Component 3: Enhancing Single Stage - One 2020-10- TF / A4224 Post Request for Bids Open - National 43,000.00 34,308.11 Completed 2019-12-30 2019-12-05 2020-01-04 2020-11-04 2020-02-15 2020-01-09 2020-03-16 2020-02-18 2020-04-20 2020-03-04 atJigmeling under Dekiling, Access to Markets Envelope 17 Sarpang Dzongkhag BT-MOAF-141898-CW-RFB / Construction of distribution Network for Rateykhola Irrigation scheme under Component 2: Enhancing Single Stage - One 2020-10- dekiling Gewog, Sarpang TF / A4224 Post Request for Bids Open - National 240,891.00 143,623.06 Signed 2019-12-30 2019-12-26 2020-01-04 2020-02-15 2020-01-27 2020-03-16 2020-02-14 2020-04-20 2020-04-06 Farmer Productivity Envelope 17 Dzongkhag to ensure equal and efficient distribution of water among the beneficiary farmers. BT-MOAF-141902-CW-RFB / Construction of Distribution Network of Laringkhola Irrigation Scheme under Component 2: Enhancing Single Stage - One 2020-10- Gadkiling Gewog, Sarpang TF / A4224 Post Request for Bids Open - National 94,000.00 90,336.07 Completed 2019-12-30 2019-12-26 2020-01-04 2020-02-15 2020-01-27 2020-03-16 2020-02-14 2020-04-20 2020-03-16 Farmer Productivity Envelope 17 Dzongkhag to ensure equal and efficient water distribution among the beneficiary farmers. BT-MOAF-141905-CW-RFB / Construction of Distribution Network for Tharaykhola Irrigation scheme under Component 2: Enhancing Single Stage - One 2020-10- Norboogang Gewog, Samtse TF / A4224 Post Request for Bids Open - National 110,000.00 0.00 Canceled 2019-12-30 2019-12-26 2020-01-04 2020-02-15 2020-01-27 2020-03-16 2020-02-14 2020-04-20 Farmer Productivity Envelope 17 Dzongkhag to ensure equal and efficient distribution of water among the beneficiary farmers. BT-MOAF-142481-CW-RFB / Construction of Distribution Component 2: Enhancing Single Stage - One 2020-11- Network for Birkhola Irrigation TF / A4224 Post Request for Bids Open - National 37,000.00 58,150.15 Signed 2020-01-15 2019-12-26 2020-01-20 2020-03-02 2020-01-27 2020-04-01 2020-02-14 2020-05-06 2020-03-16 Farmer Productivity Envelope 02 Scheme, at Dophuchen Gewog. BT-MOAF-173655-CW-RFQ / Construction of Distribution Component 2: Enhancing Single Stage - One 2021-03- Network for Tharaykhola TF / A4224 Post Request for Bids Open - National 110,000.00 106,101.00 Signed 2020-06-05 2020-03-17 2020-06-10 2020-07-22 2020-03-31 2020-08-21 2020-06-11 2020-09-25 2020-05-26 Farmer Productivity Envelope 24 Irrigation Scheme, Norbugang Gewog, Samtse Dzongkhag. BT-MOAF-188134-CW-RFB / Construction of Smart Component 2: Enhancing Request for Single Stage - One 2021-06- Irrigation System for National TF / A4224 Post Open - National 55,000.00 49,146.36 Completed 2020-10-20 2020-12-15 2020-03-16 Farmer Productivity Quotations Envelope 13 Citrus Repository, ARDSC, Tsirang . National BT-MOAF-230361-CW-RFB / Procurement Pending Construction of Cold Store Component 3: Enhancing Request for Single Stage - One 2022-04- TF / A4224 Post Open - National Document - 2 66,780.00 0.00 Implementat 2021-08-17 2021-10-12 and Packing House at Access to Markets Quotations Envelope 10 Envelope process ion Dagapela, Dagana (Non Bank-SPD) Dzongkhag. National BT-MOAF-236738-CW-RFB / Procurement Pending Construction of Multi- Component 3: Enhancing Single Stage - Two 2022-08- TF / A4224 Post Request for Bids Open - National Document - 2 601,042.00 0.00 Implementat 2021-09-02 2021-09-07 2021-10-19 2022-01-01 2022-02-05 Chamber Cold Store at Samtse Access to Markets Envelope 04 Envelope process ion Dzongkhag. (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G1 / Equipment and Component 1:Strengthening Request for Single Stage - One dissemination of BCC / Post Open - National 8,005.00 0.00 Canceled 2016-11-01 2016-12-27 2017-01-27 Farmer and Producer Groups Quotations Envelope materials G2 / Demonstration of Component 1:Strengthening Request for Single Stage - One / Post Open - National 10,000.00 0.00 Canceled 2016-11-06 2017-01-01 2017-01-31 improved technologies Farmer and Producer Groups Quotations Envelope Component 1:Strengthening Request for Single Stage - One G3 / Farm machinery / Post Open - National 39,000.00 0.00 Canceled 2016-11-06 2017-01-01 2017-06-30 Farmer and Producer Groups Quotations Envelope G4 / Green Houses Component 1:Strengthening Request for Single Stage - One / Post Open - National 20,000.00 0.00 Canceled 2016-11-06 2017-01-01 2017-02-02 (vegetables) Farmer and Producer Groups Quotations Envelope Component 1:Strengthening Request for Single Stage - One G5 / Electric fencing / Post Open - National 40,000.00 0.00 Canceled 2016-11-06 2017-01-01 2017-02-02 Farmer and Producer Groups Quotations Envelope G9 / Cardamom propogation Component 1:Strengthening Request for Single Stage - One house for farmers (materials / Post Open - National 25,000.00 0.00 Canceled 2016-11-06 2017-01-01 2017-02-01 Farmer and Producer Groups Quotations Envelope only) Component 1:Strengthening G8 / Seeds and seedlings / Prior Direct Selection Direct 300,000.00 0.00 Canceled 2017-04-20 2017-04-25 2017-05-30 2017-06-30 Farmer and Producer Groups G17 / Office Component 1:Strengthening Request for Single Stage - One TF / A4224 Post Open - National 3,000.00 3,318.27 Completed 2017-02-05 2017-04-02 2018-04-17 2017-05-02 2018-06-11 equipment/furniture Farmer and Producer Groups Quotations Envelope Page 2 G6 / Purchase of irrigation design software and surveying Component 1:Strengthening / Post Direct Selection Direct 20,000.00 0.00 Canceled 2017-01-31 2017-02-05 2017-03-12 2017-04-26 equipments (Total Station & Farmer and Producer Groups design Software) G7 / Support to Citrus Component 1:Strengthening Request for Single Stage - One repository RDSC Tsirang / Post Open - National 15,000.00 0.00 Canceled 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope (equipments) Component 1:Strengthening Request for Single Stage - One G15 / Photocopier heavy duty TF / A4224 Post Open - National 2,000.00 1,666.14 Completed 2017-02-05 2017-04-02 2018-04-24 2017-05-02 2018-05-11 Farmer and Producer Groups Quotations Envelope Component 1:Strengthening Request for Single Stage - One G12 / Laptops / Post Open - National 7,000.00 0.00 Canceled 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope Component 1:Strengthening Request for Single Stage - One G13 / Printers / Post Open - National 2,400.00 0.00 Canceled 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope Component 4: Project Single Stage - Two G11 / Vehicle TF / A4224 Prior Request for Bids Open - National 150,000.00 0.00 Canceled 2017-01-31 2017-02-05 2017-03-19 2017-06-01 2017-07-06 2018-01-02 Management Envelope BT-MOAF-38468-GO-RFB / Computers, Printers, Component 4: Project Single Stage - One Scanners, Photocopy Machine, TF / A4224 Post Request for Bids Open - National 13,009.00 12,269.93 Completed 2017-11-30 2017-12-07 2017-12-05 2018-01-16 2018-06-25 2018-02-15 2018-06-29 2018-03-22 2018-04-24 2018-09-18 2018-12-26 Management Envelope LCD Projector, Furniture's, and heaters and Radiators BT-MOAF-39796-GO-RFB / Procurement of plastic crates, Component 3: Enhancing Single Stage - Two TF / A4224 Post Request for Bids Open - National 12,159.00 14,094.47 Completed 2017-12-15 2018-03-13 2017-12-20 2018-06-24 2018-01-31 2018-04-19 2018-04-15 2018-06-13 2018-05-20 2018-06-25 2018-11-16 2018-08-01 Digital Weighing Balance and Access to Markets Envelope packaging bags BT-MOAF-39904-GO-RFB / Component 2: Enhancing Single Stage - One Procurement of Hardware TF / A4224 Post Request for Bids Open - National 23,000.00 0.00 Canceled 2017-12-25 2017-12-30 2018-02-10 2018-03-12 2018-04-16 2018-10-13 Farmer Productivity Envelope items BT-MOAF-41103-GO-RFB / Procurement of Agriculture Component 4: Project Single Stage - One TF / A4224 Post Request for Bids Open - National 193,000.00 139,908.59 Completed 2018-01-01 2017-05-30 2018-01-06 2018-02-17 2017-07-27 2018-03-19 2017-08-25 2018-04-23 2017-06-14 2018-10-20 2018-06-25 Tools and Equipments Management Envelope (Vegetables) BT-MOAF-39905-GO-RFB / Component 2: Enhancing Request for Single Stage - One Procurement of Construction TF / A4224 Post Open - National 10,577.00 0.00 Canceled 2018-02-04 2018-04-01 2018-09-28 Farmer Productivity Quotations Envelope materials, Bajo ARDC BT-MOAF-42255-GO-RFQ / Component 2: Enhancing Request for Single Stage - One Procurement of Hardware TF / A4224 Post Open - National 18,500.00 2,678.77 Completed 2018-02-04 2018-06-14 2018-04-01 2017-08-08 2018-09-28 2018-01-09 Farmer Productivity Quotations Envelope items (ARDC, Samtenling) BT-MOAF-43627-GO-RFB / Procurement of Vegetable Component 1:Strengthening Single Stage - One TF / A4224 Post Request for Bids Open - National 7,000.00 2,227.50 Completed 2018-01-30 2017-05-30 2018-02-04 2018-03-18 2017-06-05 2018-04-17 2017-07-31 2018-05-22 2017-11-09 2018-11-18 2018-05-23 seeds and Tools (Haa Farmer and Producer Groups Envelope Dzongkhag) BT-MOAF-43631-GO-RFB / Procurement of Hardware Component 1:Strengthening Single Stage - One TF / A4224 Post Request for Bids Open - National 12,000.00 9,781.32 Completed 2018-01-31 2017-06-05 2018-02-05 2018-03-19 2017-07-28 2018-04-18 2017-07-21 2018-05-23 2017-08-08 2018-11-19 2018-05-31 Items and Tools (Samtse Farmer and Producer Groups Envelope Dzongkhag) BT-MOAF-43634-GO-RFB / Procurement of Agriculture Component 1:Strengthening Single Stage - One TF / A4224 Post Request for Bids Open - National 25,500.00 9,061.87 Completed 2018-01-31 2017-05-24 2018-02-05 2018-03-19 2017-06-28 2018-04-18 2017-08-18 2018-05-23 2018-05-09 2018-11-19 2018-06-06 Tools and Hardware Items Farmer and Producer Groups Envelope (Dagana Dzongkhag) BT-MOAF-43663-GO-RFB / Component 1:Strengthening Single Stage - One Procurement of Agriculture TF / A4224 Post Request for Bids Open - National 20,000.00 2,242.12 Completed 2018-03-28 2018-02-20 2018-04-02 2018-05-14 2018-03-23 2018-06-13 2018-03-30 2018-07-18 2018-05-14 2019-01-14 2018-06-29 Farmer and Producer Groups Envelope Tools (AMC Paro) BT-MOAF-43629-GO-RFB / Procurement of Vegetable Component 1:Strengthening Request for Single Stage - One TF / A4224 Post Limited 2,000.00 0.00 Canceled 2018-02-25 2017-05-30 2018-04-22 2018-10-19 seeds and Tools (Chukha Farmer and Producer Groups Quotations Envelope Dzongkhag) BT-MOAF-42997-GO-RFB / Component 2: Enhancing Request for Single Stage - One Procurement of Hardware TF / A4224 Post Limited 1,000.00 1,606.33 Completed 2018-03-03 2017-06-05 2018-04-28 2017-08-21 2018-10-25 2018-03-06 Farmer Productivity Quotations Envelope Items (Sarpang Dzongkhag) BT-MOAF-42257-GO-DIR / Component 2: Enhancing Direct Purchase of Manures TF / A4224 Post Direct Selection Direct 230.00 0.00 Canceled 2018-01-30 2018-02-04 2018-03-11 2018-09-07 Farmer Productivity (ARDC, Samtenling) G10 / Cardamom curing Component 1:Strengthening Request for Single Stage - One / Post Open - National 10,000.00 0.00 Canceled 2016-11-06 2017-01-01 2017-02-01 house Farmer and Producer Groups Quotations Envelope Component 1:Strengthening Request for Single Stage - One G16 / Binding machine / Post Open - National 600.00 0.00 Canceled 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope Component 1:Strengthening Request for Single Stage - One G14 / Scanner / Post Open - National 600.00 0.00 Canceled 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope BT-MOAF-54803-GO-DIR / Procurement of Laptops for Component 4: Project Request for Single Stage - One TF / A4224 Post Limited 12,000.00 0.00 Canceled 2018-05-02 2018-05-02 2018-06-27 2018-12-24 PSC Members and PMU Management Quotations Envelope Officials BT-MOAF-52058-GO-DIR / Component 2: Enhancing Procurement of Irrigation TF / A4224 Post Direct Selection Direct 10,000.00 0.00 Canceled 2018-03-12 2018-03-17 2018-04-21 2018-10-18 Farmer Productivity Design Software BT-MOAF-60199-GO-RFB / Procurement of 5 Units of Component 4: Project Single Stage - One Diesel Hilux/ Pickup for the TF / A4224 Post Request for Bids Open - National 181,888.54 182,628.70 Completed 2018-04-27 2018-05-02 2018-05-02 2018-06-22 2018-06-13 2018-05-04 2018-07-13 2018-06-07 2018-08-17 2018-08-30 2019-02-13 2018-09-05 Management Envelope Project Management Unit, FSAPP. BT-MOAF-37859-GO-DIR / Component 4: Project TF / A4224 Post Direct Selection Direct 181,888.54 0.00 Canceled 2017-11-23 2017-11-28 2017-10-25 2018-01-02 2018-07-01 Vehicle Management Page 3 BT-MOAF-40993-GO-RFQ / Component 4: Project Request for Single Stage - One Procurement of Office TF / A4224 Post Limited 6,000.00 0.00 Canceled 2018-01-13 2018-01-12 2018-03-10 2018-09-06 Management Quotations Envelope Funritures and Equipments BT-MOAF-72352-GO-RFQ / Procurement of office furniture's for the newly established Project Office. Component 4: Project Request for Single Stage - One Manager Table (12 nos), TF / A4224 Post Limited 6,000.00 3,657.59 Completed 2018-08-07 2018-01-26 2018-10-02 2018-04-17 2019-03-31 2018-04-18 Management Quotations Envelope Bookshelf (5 nos), file rack (2 nos), revolving Chair (9 nos), Guest Chair (12 nos) and Steel Almirah (2 nos) BT-MOAF-72486-GO-RFB / Procurement of 20 Direct Component 2: Enhancing Single Stage - One Paddy seeders for ARDC, Paro TF / A4224 Post Request for Bids Open - National 2,500.00 2,201.59 Completed 2018-08-10 2018-02-01 2018-08-15 2018-09-26 2018-03-23 2018-10-26 2018-03-29 2018-11-30 2018-05-03 2019-05-29 2018-05-15 Farmer Productivity Envelope and farmers of the 5 Project Districts. BT-MOAF-72487-GO-RFB / Procurement of 20 Brush Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 8,000.00 7,090.11 Completed 2018-08-10 2018-02-01 2018-08-15 2018-09-26 2018-03-23 2018-10-26 2018-03-30 2018-11-30 2018-05-03 2019-05-29 2018-05-04 cutters for the farmers of the Farmer Productivity Envelope 5 districts of the Project. BT-MOAF-73758-GO-RFB / Procurement of 20 Drip/Micro Irrigation, and 35 Pending Component 2: Enhancing Single Stage - One sets of green house be issued TF / A4224 Post Request for Bids Open - National 30,000.00 0.00 Implementati 2018-12-13 2018-12-18 2019-01-29 2019-02-28 2019-04-04 2019-10-01 Farmer Productivity Envelope to the 5 Project Gewogs (Eusu, on Samar, Gadkiling and Sombaykha). BT-MOAF-74417-GO-DIR / Procurement of Cardamom Dryers for Haa Dzongkhag to Component 3: Enhancing be further distributed to TF / A4224 Post Direct Selection Direct 5,500.00 3,095.44 Completed 2019-01-10 2019-02-19 2019-01-15 2019-04-18 2019-02-19 2019-04-19 2019-08-18 2019-04-22 Access to Markets Project Gewogs to enhance the market accessibility of Cardamom. BT-MOAF-74497-GO-RFB / Procurement of 55 Poly house plastic film, 55 poly house nylon belt, 20- numbers of green net, 19 sets of drip Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 17,500.00 13,806.23 Completed 2019-01-31 2018-11-19 2019-02-05 2019-03-19 2018-12-25 2019-04-18 2019-03-11 2019-05-23 2019-04-15 2019-11-19 2019-06-11 irrigation, 100 roll of plastic Farmer Productivity Envelope mulching, 10 numbers of syntax and 10 numbers of silpaulin sheet to be issued to the project Gewogs, Chhukha. BT-MOAF-74502-GO-RFB / Direct procurement of 31 rolls of HDPE pipe from Bhutan Polythene as per the Component 2: Enhancing TF / A4224 Post Direct Selection Direct 2,000.00 0.00 Canceled 2018-12-14 2018-12-19 2019-01-23 2019-07-22 Directives of the Ministry of Farmer Productivity Finance and issue to the project Gewogs under Chhukha Dzongkhag. BT-MOAF-74504-GO-RFB / Procurement of one set of Component 2: Enhancing Single Stage - One Quinoa processing plant in TF / A4224 Post Request for Bids Open - National 8,000.00 0.00 Canceled 2018-12-20 2018-12-25 2019-02-05 2019-03-07 2019-04-11 2019-10-08 Farmer Productivity Envelope one of the Project Gewogs under Chhukha Dzongkhag. BT-MOAF-75068-GO-RFB / Procurement of three Stone Pickers for AMC, Paro. (The procurement is already done Component 2: Enhancing Single Stage - One based on the approved TF / A4224 Post Request for Bids Open - National 15,500.00 14,482.86 Completed 2018-08-23 2018-02-20 2018-08-28 2018-10-09 2018-03-23 2018-11-08 2018-03-26 2018-12-13 2018-05-14 2019-06-11 2018-05-14 Farmer Productivity Envelope procurement plan vide ref. no. BT-MOAF-43663-GO-RFB, Procurement of Agriculture Tools (AMC, Paro)) BT-MOAF-75069-GO-RFB / Procurement of 20 Brush Cutters for AMC, Paro to be further distributed to Project Districts. (The procurement is Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 8,000.00 2,194.56 Completed 2018-08-23 2018-02-01 2018-08-28 2018-10-09 2018-03-23 2018-11-08 2018-03-26 2018-12-13 2018-05-03 2019-06-11 2018-05-04 already done based on the Farmer Productivity Envelope approved procurement plan vide ref. no. BT-MOAF-43663- GO-RFB, Procurement of Agriculture Tools (AMC, Paro)) BT-MOAF-77883-GO-RFB / Procurement of Argiculture tools and Equipments -32- sprinklers, 4- syntex (5000 litres), 5-rolls flexible pipes Component 2: Enhancing Single Stage - One for irrigation, 100- numbers TF / A4224 Post Request for Bids Open - National 21,000.00 27,431.33 Completed 2019-01-31 2018-11-19 2019-02-05 2019-03-19 2019-01-01 2019-04-18 2019-03-14 2019-05-23 2019-04-09 2019-11-19 2019-06-14 Farmer Productivity Envelope of green house shed, 2- numbers of prefabricated poly house for Norbugang & Sangacholing, Samtse Dzongkhag. BT-MOAF-78285-GO-RFB / Procurement of Electric Pending Fencing materials to be issued Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 6,500.00 0.00 Implementati 2018-10-22 2018-10-27 2018-12-08 2019-01-07 2019-02-11 2019-08-10 to farmers of Tendruk Gewog Farmer Productivity Envelope on (4km) and Tading Gewog (3km), Samtse Dzongkhag. BT-MOAF-78286-GO-DIR / Procurement of 2010 pakcets of vegetable seeds, 6500 kgs of paddy seeds and 12000 Component 2: Enhancing TF / A4224 Post Direct Selection Direct 11,500.00 11,995.40 Completed 2019-01-31 2018-08-14 2019-02-05 2018-08-14 2019-03-12 2018-08-15 2019-09-08 2019-06-05 kgs of seed potato to be Farmer Productivity issued to the farmers of various project Gewogs under Sarpang Dzongkhag. Page 4 BT-MOAF-78287-GO-RFB / Procurement of 87 numbers of plastic sheets (low cost), 50 numbers of secateurs, 50 Component 2: Enhancing Single Stage - One numbers of pruning saw, 20 TF / A4224 Post Request for Bids Open - National 25,500.00 14,293.42 Completed 2019-01-01 2018-11-20 2019-01-06 2019-02-17 2018-12-25 2019-03-19 2019-01-07 2019-04-23 2019-04-17 2019-10-20 2020-06-30 Farmer Productivity Envelope sets of spraying suits, 56-drip sets, 50-rolls of plastic Mulch to be issued to farmers under Sarpang Dzongkhag. BT-MOAF-78288-GO-RFB / Procurement of Electric Pending Fencing materials for 10 km Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 4,500.00 0.00 Implementati 2019-01-03 2019-01-08 2019-02-19 2019-03-21 2019-04-25 2019-10-22 to be issued to one of the Farmer Productivity Envelope on project Gewog under Sarpang Dzongkhag. BT-MOAF-78294-GO-DIR / Procurement of seeds from National Seed Centre (Chilli- 40 packets, Tomato-25 Component 2: Enhancing TF / A4224 Post Direct Selection Direct 2,000.00 790.00 Completed 2019-01-30 2019-04-19 2019-02-04 2019-04-24 2019-03-11 2019-04-24 2019-09-07 2019-05-15 packets, Cucumber-25 Farmer Productivity packets and Quiona-600 kgs) to be used in ARDC, Samtenling, Sarpang. BT-MOAF-78295-GO-RFB / Procurement of general tools such as 6 rolls of flexible pipe, 15 roll of plastic mulch, Component 2: Enhancing Single Stage - One 11 rolls of poly house plastic TF / A4224 Post Request for Bids Open - National 3,500.00 15,962.28 Completed 2019-01-31 2018-11-16 2019-02-05 2019-03-19 2018-12-25 2019-04-18 2019-01-23 2019-05-23 2019-02-13 2019-11-19 2019-05-01 Farmer Productivity Envelope sheet and 11 rolls of pre- fabricated poly house to be used in ARDC, Samtenling, Sarpang. BT-MOAF-78296-GO-RFB / Procurement of 1-unit Quiona Component 2: Enhancing Single Stage - One Dehusking Machine to be TF / A4224 Post Request for Bids Open - National 1,500.00 15,962.28 Completed 2019-01-31 2018-11-20 2019-02-05 2021-02-18 2019-03-19 2018-12-25 2019-04-18 2019-01-23 2019-05-23 2019-02-13 2019-11-19 2019-05-01 Farmer Productivity Envelope used in ARDC, Samtenling, Sarpang. BT-MOAF-78297-GO-RFB / Pending Procurement of 1 unit-Farm Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 2,500.00 0.00 Implementati 2019-01-31 2019-02-05 2019-03-19 2019-04-18 2019-05-23 2019-11-19 Mini- Tiller for Drujaygang Farmer Productivity Envelope on Gewog on cost sharing basis. BT-MOAF-78298-GO-DIR / Procurement of fertilizers to be issued to Drujaygang Component 2: Enhancing TF / A4224 Post Direct Selection Direct 3,000.00 2,050.26 Completed 2018-12-20 2018-06-07 2018-12-25 2018-06-08 2019-01-29 2018-06-12 2019-07-28 2018-06-19 gewog 110 bags and Kana Farmer Productivity Gewog 120 bags under Dagana Dzongkhag. BT-MOAF-78299-GO-DIR / Procurement of seeds from National Seed Centre to be issued to Gewogs such as Karmaling-1500 of citrus & Component 2: Enhancing TF / A4224 Post Direct Selection Direct 3,900.00 4,868.32 Completed 2018-12-12 2019-03-25 2018-12-17 2019-03-28 2019-01-21 2019-03-28 2019-07-20 2019-06-14 4000 cardamom, Drujaygang Farmer Productivity 2500 citrus & 4000 cardamom, and Kana 2000 citrus & 4000 cardamom under Dagana Dzongkhag. BT-MOAF-78300-GO-RFB / Procurement of materials for Cardamom Dryer to be issued Component 2: Enhancing Single Stage - One to various gewogs such as TF / A4224 Post Request for Bids Open - National 14,000.00 15,429.97 Completed 2018-12-14 2019-02-02 2018-12-19 2019-01-30 2019-02-18 2019-03-01 2019-02-19 2019-04-05 2019-03-21 2019-10-02 2019-03-29 Farmer Productivity Envelope Karmaling 8 sets, Drujaygang 10 sets and Kana 12 sets under Dagana Dzongkhag. BT-MOAF-80366-GO-RFB / Procurement of protected Agriculture Inputs ( 1kit) like Polyhose Plastic film, Polyhouse nylon belt, Component 2: Enhancing Single Stage - One Prefabricated green house, TF / A4224 Post Request for Bids Open - National 35,000.00 0.00 Canceled 2018-10-02 2018-10-07 2018-11-18 2018-12-18 2019-01-22 2019-07-21 Farmer Productivity Envelope Green shade net, Anti Bird Net, Plastic Mulch, Vegetable Transplanter and Knapsack sprayer for winter vegetable program BT-MOAF-80367-GO-RFB / Procurement of Water Use Efficient Irrigation Inputs (1 kit) for Vegetable Production Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 46,000.00 33,718.24 Completed 2018-11-15 2018-09-26 2018-11-20 2019-01-01 2018-10-29 2019-01-31 2018-11-01 2019-03-07 2019-01-30 2019-09-03 2019-05-14 like Sintex, Flexible pipes, Farmer Productivity Envelope watering can, drip kits and silpaulin sheets for winter vegetable. BT-MOAF-86039-GO-DIR / Procurement of 117 bags of Component 2: Enhancing fertilizers to be used in TF / A4224 Post Direct Selection Direct 1,000.00 535.72 Completed 2018-12-28 2019-06-24 2019-01-02 2019-06-26 2019-02-06 2019-06-26 2019-08-05 2019-06-26 Farmer Productivity research Centre, ARDC, Samtenling, Sarpang BT-MOAF-86049-GO-DIR / Supply and Installation of Component 2: Enhancing TF / A4224 Post Direct Selection Direct 77,000.00 89,035.69 Completed 2018-11-23 2019-01-17 2018-11-28 2019-03-29 2019-01-02 2019-05-01 2019-07-01 2019-09-12 Hydroponics in 3-ARDC's Farmer Productivity Yusipang, Bajo and samtenling BT-MOAF-93460-GO-RFQ / Procurement of one Vaccum Component 4: Project Request for Single Stage - One Cleaner, Office Carpet and TF / A4224 Post Limited 1,500.00 0.00 Canceled 2019-01-16 2019-03-13 2019-09-09 Management Quotations Envelope Five Fans for Project Management Unit (PMU) Page 5 BT-MOAF-95025-GO-RFQ / Procurement of construction materials for composting system for demonstration in 5 Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Limited 1,500.00 845.27 Completed 2019-03-05 2017-06-12 2019-04-30 2018-01-15 2019-10-27 2018-02-13 Project Gewogs under Dagana Farmer Productivity Quotations Envelope Dzongkhag (Karna, Drujeygang, lhamoizingkha, karmaling and Nichula) BT-MOAF-95030-GO-RFQ / Procurement of materials for Citrus Potting-150 numbers rubber barrels, 2-table for Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 1,900.00 928.63 Completed 2019-03-03 2019-04-28 2019-04-29 2019-10-25 2019-05-09 chemicals and 5-chemical Farmer Productivity Quotations Envelope shelfs to used for citrus mother plants in ARDSC, Tsirang, Menchuna. BT-MOAF-98166-GO-RFQ / Procurement of 1-Juicer and 1- Component 2: Enhancing Request for Single Stage - One Pulper to be used as training TF / A4224 Post Limited 770.00 0.00 Canceled 2019-02-13 2019-04-10 2019-10-07 Farmer Productivity Quotations Envelope material. the Training to b provided by ARDC, Yusipang. BT-MOAF-78301-GO-DIR / Procurement of HDPE pipe for micro Irrigation for three Component 2: Enhancing Gewogs viz. Karmaling TF / A4224 Post Direct Selection Direct 45,000.00 5,078.62 Completed 2019-02-12 2020-04-02 2019-02-17 2020-05-01 2019-03-24 2020-05-25 2019-09-20 2020-06-12 Farmer Productivity $12400, Drujaygang $620 and Kana Gewog $ 33000 under Dagana Dzongkhag. BT-MOAF-99113-GO-DIR / Procurement of HDPE Pipes Component 2: Enhancing TF / A4224 Post Direct Selection Direct 140.00 7,258.01 Completed 2019-03-05 2018-02-28 2019-03-10 2018-03-02 2019-04-14 2018-04-24 2019-10-11 2018-04-24 and Flanges directly from Farmer Productivity Bhutan Polythene. BT-MOAF-99117-GO-RFQ / Procurement of Cardamom Component 2: Enhancing Request for Single Stage - One dryer for Chhukha Dzongkhag TF / A4224 Post Limited 3,500.00 1,446.86 Completed 2019-04-02 2018-05-28 2019-05-28 2018-06-11 2019-11-24 2018-06-30 Farmer Productivity Quotations Envelope to be issued to one of the Project Gewog. BT-MOAF-99185-GO-RFB / procurement of 400 hand gloves, 10 knapsack sprayer, 50-pruning loper, 200-pee Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Limited 2,400.00 431.80 Completed 2019-03-03 2018-04-18 2019-04-28 2018-05-07 2019-10-25 2018-05-07 cap and 18- leather tool kits Farmer Productivity Quotations Envelope to be issued to project Gewogs under Dagana Dzongkhag. BT-MOAF-99186-GO-RFB / Procurement of 50- secateurs Component 2: Enhancing Request for Single Stage - One and 50-pruning saw to be TF / A4224 Post Limited 3,500.00 3,345.95 Completed 2019-03-05 2017-10-30 2019-04-30 2018-04-27 2019-10-27 2018-06-20 Farmer Productivity Quotations Envelope issued to project Gewogs under Dagana Dzongkhag. BT-MOAF-99189-GO-DIR / Procurment of 20 bottles- Chloropyrifos (to control citrus fruit drop) and 10- Component 2: Enhancing TF / A4224 Post Direct Selection Direct 140.00 130.67 Completed 2019-02-22 2018-02-12 2019-02-27 2018-01-10 2019-04-03 2018-01-11 2019-09-30 2018-04-16 Sandovit (sticker) (To control Farmer Productivity citrus fruit drop) to be issued to project Gewogs under Danaga Dzongkhag. BT-MOAF-99191-GO-DIR / Procurement of 2303 packets of high quality vegetable Component 2: Enhancing TF / A4224 Post Direct Selection Direct 7,000.00 5,404.28 Completed 2019-02-26 2018-09-05 2019-03-03 2018-11-01 2019-04-07 2018-01-11 2019-10-04 2018-06-22 seeds and fertilizers to be Farmer Productivity issued to the project Gewogs under Dagana Dzongkhag. BT-MOAF-99194-GO-DIR / Procurement of construction materials like cement and Component 2: Enhancing TF / A4224 Post Direct Selection Direct 960.00 445.34 Completed 2019-02-21 2017-12-01 2019-02-26 2018-01-03 2019-04-02 2018-01-15 2019-09-29 2018-05-25 bricks for vermi composting Farmer Productivity for project Gewogs under Dagana Dzongkhag. BT-MOAF-95040-GO-RFB / Procurement of materials for expansion of azolla production. 25 numbers- Silpaulin sheets and 50 kg- Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 1,500.00 3,934.35 Completed 2019-03-25 2019-05-20 2018-05-08 2019-11-16 2018-05-09 azolla seeds to used in Project Farmer Productivity Quotations Envelope Gewogs (Karna, Drujeygang, Lhamoizingkha, Karmaling and Nicgula under Dagana Dzongkhag. BT-MOAF-95032-GO-RFB / Procurement of materials for electric fencing (1km) such as 450-HDPE Poles, 100kg-GI Pending Component 2: Enhancing Request for Single Stage - One Wire, 1 set Energizer, 1- TF / A4224 Post Open - National 5,000.00 0.00 Implementati 2019-03-30 2019-05-25 2019-11-21 Farmer Productivity Quotations Envelope energizer box, 5 -Tarpari tool on set etc. To be used in Karna Gewog under Dagana Dzongkhag. BT-MOAF-95028-GO-RFB / Procurement of martials for water harvesting system 100- silpaulin sheets for Project Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 2,100.00 2,161.28 Completed 2019-04-03 2019-05-29 2018-10-15 2019-11-25 2018-11-07 Gewogs such as Karna, Farmer Productivity Quotations Envelope Drujecygang, Lhamoizingkha, karmaling and Nichula under Dagana Dzongkhag. BT-MOAF-99115-GO-RFB / Procurement Agriculture Component 2: Enhancing Request for Single Stage - One Tools/Implements and TF / A4224 Post Open - National 2,950.00 16,800.49 Completed 2019-03-18 2019-05-13 2019-02-13 2019-11-09 2019-05-01 Farmer Productivity Quotations Envelope Equipments for ARDC, Samteling. Page 6 BT-MOAF-99187-GO-RFB / Procurement of 28-safety suits , 2-power chain, black Component 2: Enhancing Request for Single Stage - One plastic bags and plastic TF / A4224 Post Open - National 1,600.00 1,278.40 Completed 2019-03-31 2019-05-26 2018-05-25 2019-11-22 2018-06-19 Farmer Productivity Quotations Envelope grafting tape to be issued to project Gewogs under Dagana Dzongkhag. BT-MOAF-99188-GO-RFB / Procurement of 100 kg-lime for citrus management, CJI Component 2: Enhancing Request for Single Stage - One Sheets (Vermi Composting), TF / A4224 Post Open - National 1,000.00 1,598.79 Completed 2019-04-01 2019-05-27 2018-05-21 2019-11-23 2018-06-19 Farmer Productivity Quotations Envelope Nails and wire mesh to be issued to project Gewogs under Dagana Dzongkhag. BT-MOAF-99068-GO-RFB / Procurement of Flexible pipes, Component 2: Enhancing Request for Single Stage - One jute bag, plastic bags & TF / A4224 Post Open - National 1,000.00 778.74 Completed 2019-04-07 2019-06-02 2017-08-07 2019-11-29 2018-06-24 Farmer Productivity Quotations Envelope Agroshading net for ARDC, Yusipang. BT-MOAF-99098-GO-RFB / Component 2: Enhancing Request for Single Stage - One Procurement of Pickaxe (5kg), TF / A4224 Post Open - National 3,000.00 3,947.81 Completed 2019-04-03 2019-05-29 2018-06-12 2019-11-25 2018-06-29 Farmer Productivity Quotations Envelope Top Pruner and Poly house. BT-MOAF-99108-GO-RFB / Component 2: Enhancing Request for Single Stage - One Procurement of Flexible pipes TF / A4224 Post Open - National 1,000.00 65.06 Completed 2019-04-03 2019-05-29 2017-08-29 2019-11-25 2017-12-19 Farmer Productivity Quotations Envelope and Silpaulin sheets. BT-MOAF-99179-GO-RFB / Procurement of low cost poly Component 2: Enhancing Request for Single Stage - One house for winter vegetable to TF / A4224 Post Open - National 3,000.00 8,401.91 Completed 2019-03-25 2019-05-20 2018-01-15 2019-11-16 2018-06-29 Farmer Productivity Quotations Envelope issued to project Gewogs under Chhukha Dzongkhag. BT-MOAF-99180-GO-RFB / Procurement of 150-Plastic Component 2: Enhancing Request for Single Stage - One Crates to be issued to Project TF / A4224 Post Open - National 2,800.00 2,077.34 Completed 2019-04-02 2019-05-28 2018-06-25 2019-11-24 2018-06-29 Farmer Productivity Quotations Envelope Gewogs under Chhukha Dzongkhag BT-MOAF-99193-GO-RFB / Procurement of Copper Pending Sulphate (for citrus canopy Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 1,800.00 0.00 Implementati 2019-03-27 2019-05-22 2019-11-18 management) to be issued to Farmer Productivity Quotations Envelope on the project Gewogs under Dagana Dzongkhag. BT-MOAF-99092-GO-RFB / Procurement of Pruning saw Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 100.00 3,814.39 Completed 2019-04-03 2019-05-29 2017-11-18 2019-11-25 2018-01-01 and Secateurs for citrus Farmer Productivity Quotations Envelope program. BT-MOAF-99083-GO-RFB / Procurement of Knapsack sprayer, Brush cutter, Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 9,000.00 14,361.66 Completed 2019-04-01 2019-05-27 2017-04-17 2019-11-23 2018-08-23 Sceatuer, Gafting knife, Farmer Productivity Quotations Envelope budding knife, screen house and poly house. BT-MOAF-99195-GO-RFB / Procurement of 100-Goggles Component 2: Enhancing Request for Single Stage - One UD 46 to be issued to the TF / A4224 Post Open - National 160.00 151.47 Completed 2019-04-01 2019-05-27 2018-04-02 2019-11-23 2018-06-28 Farmer Productivity Quotations Envelope project Gewogs under Dagana Dzongkhag. BT-MOAF-104516-GO-RFQ / Procurement of 8-mid end Laptops and 2-Desktops to be issued to Officials of Department of Agricultural Component 3: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 12,400.00 13,148.70 Completed 2019-03-31 2019-05-26 2019-06-13 2019-11-22 2019-08-22 Marketing and Cooperatives Access to Markets Quotations Envelope (DAMC) and Regional Agricultural Marketing and Cooperative Office Gelephu, under Sarpang Dzongkhag. BT-MOAF-104518-GO-RFQ / Procurement of one set of Pending Component 2: Enhancing Request for Single Stage - One Potato Fryer to be issued to TF / A4224 Post Limited 1,500.00 0.00 Implementati 2019-04-03 2019-05-29 2019-11-25 Farmer Productivity Quotations Envelope Bongo Gewog under Chhukha on Dzongkhag. BT-MOAF-114390-GO-DIR / Procurement of vegetable seeds Cabbage 64-packets, cauliflower 64-packets, Broccoli 59-packets, carrot 64- Component 2: Enhancing TF / A4224 Post Direct Selection Direct 620.00 4,613.60 Completed 2019-05-30 2018-10-02 2019-06-04 2018-10-03 2019-07-09 2018-10-03 2020-01-05 2018-11-05 packets and lettuce 67- Farmer Productivity packets to be issued to Bongo, Getena, Samphepling, Dungna and Metekha under Chhukha Dzongkhang. BT-MOAF-129204-GO-RFQ / Procurement of Agriculture tools and Equipments- 6 nos- Budding knife, 6 nos- Secateurs, 5 kg-candle wax, Component 1:Strengthening Request for Single Stage - One TF / A4224 Post Open - National 3,300.00 1,980.47 Completed 2020-01-05 2020-03-01 2019-10-22 2020-08-28 2019-12-04 20 nos-grafting tape, 10 roll- Farmer and Producer Groups Quotations Envelope cellophane grafting tape, 100 nos- white clothes bags, 5 nos-PVC- Tarpaulin and 2 sets- poly house. BT-MOAF-130536-GO-RFB / Procurement of 2 nos- Prefabricated Poly house, 2 nos- Ventilation & net accessories 100 nos-Low Component 2: Enhancing Single Stage - One cost poly/Green house with TF / A4224 Post Request for Bids Open - National 24,000.00 24,047.54 Completed 2019-12-23 2019-11-04 2019-12-28 2020-02-08 2019-12-19 2020-03-09 2020-03-02 2020-04-13 2020-03-20 2020-10-10 2020-05-15 Farmer Productivity Envelope plastic film, 100 nos-Nylon belt for poly house, 100 nos- Green Shed Net, 10 nos- Nursery tray and 100 nos- Seedling tray. Page 7 BT-MOAF-130537-GO-DIR / Procurement of 30 nos- Sintex tanks (1000ltr & 2000 Component 2: Enhancing ltrs) and 30 roll of HDPE pipes TF / A4224 Post Direct Selection Direct 7,400.00 0.00 Canceled 2019-11-20 2019-11-25 2019-12-30 2020-06-27 Farmer Productivity to be issued to the project Gewogs under Samtse Dzongkhag. BT-MOAF-130538-GO-RFQ / Procurement of materials for Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 4,500.00 1,433.17 Completed 2020-01-21 2020-03-17 2020-03-20 2020-09-13 2020-05-11 installation of cardamom Farmer Productivity Quotations Envelope dryer at Samtse Dzongkhag. BT-MOAF-133408-GO-RFB / Procurement of Agriculture Inputs, Tools and Equipments (38-Gator sparyer, 11- Component 2: Enhancing Single Stage - One Knapsack Sprsyer, 20-Hand TF / A4224 Post Request for Bids Open - National 12,500.00 19,537.01 Completed 2019-12-11 2020-04-30 2019-12-16 2020-01-27 2020-06-01 2020-02-26 2020-06-02 2020-04-01 2020-06-04 2020-09-28 2020-06-11 Farmer Productivity Envelope tools, 45- Flexible pipes, 65- Sprinklers, 2- drip irrigation, 60-low cost ploy house, 20 kg-Wax Roxin) BT-MOAF-133409-GO-RFQ / Procurement of Agriculture Inputs, Tools and Equipments Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 10,500.00 0.00 Canceled 2019-12-24 2020-02-18 2020-08-16 7 nos- prefabricated Farmer Productivity Quotations Envelope polyhouse and 18 nos-hedge cutter. BT-MOAF-133414-GO-RFQ / Procurement of construction materials such as CGI sheet, Component 3: Enhancing Request for Single Stage - One Nails, timbers and sand for TF / A4224 Post Open - National 6,000.00 0.00 Canceled 2019-12-15 2020-02-09 2020-08-07 Access to Markets Quotations Envelope construction of Marketing structures under Haa Dzongkhag. BT-MOAF-133603-GO-RFQ / Procurement of Agriculture tools and equipments 41 sets- drip irrigation set, 40 rolls- Component 2: Enhancing Request for Single Stage - One plastic mulch, 54 nos-plastic TF / A4224 Post Open - National 17,000.00 218,196.67 Completed 2019-12-21 2020-02-15 2020-03-15 2020-08-13 2020-06-23 Farmer Productivity Quotations Envelope tanks, 8 nos-watering can, 21 rolls- flexible pipes and 50 sets- low cost poly house (with nylon belt) BT-MOAF-133728-GO-RFQ / Procurement of 122 kg-TMT Bars, 30 nos-CGI sheet, 8 nos -ridging, 5000 meters-GI wire, 15 square meter- Gi Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 11,300.00 2,304.91 Completed 2019-12-17 2020-02-11 2019-09-18 2020-08-09 2019-09-30 sheet, 22 nos-silpualin sheets Farmer Productivity Quotations Envelope and 500 nos-beehive box. To be issued to Lhamoizingkha Gewog under Dagana Dzongkhag. BT-MOAF-134019-GO-RFB / Procurement of 46 sets-drip Component 2: Enhancing Single Stage - One irrigation system, 60 rolls- TF / A4224 Post Request for Bids Open - National 17,172.00 21,670.80 Completed 2019-12-10 2019-12-10 2019-12-15 2020-01-26 2020-01-30 2020-02-25 2020-02-11 2020-03-31 2020-03-20 2020-09-27 2020-05-25 Farmer Productivity Envelope plastic mulching and 13 nos- poly house. BT-MOAF-134021-GO-RFQ / Procurement of 13 nos- Mini Power tiller (women friendly) Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Limited 41,354.00 14,201.47 Completed 2019-12-25 2020-01-16 2020-02-19 2020-03-04 2020-08-17 2020-04-27 to be issued to project Farmer Productivity Quotations Envelope gewogs under Dagana Dzongkhag. BT-MOAF-134120-GO-RFQ / Procurement of 15 sets of fabricated poly house to be Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 15,000.00 0.00 Canceled 2019-12-21 2020-02-15 2020-08-13 issued to the project Farmer Productivity Quotations Envelope Geo=wogs under Sarpang dzongkhag. BT-MOAF-134123-GO-RFQ / Procurement of 85 numbers Component 2: Enhancing Request for Single Stage - One of low cost poly house to be TF / A4224 Post Open - National 11,000.00 22,613.08 Completed 2019-12-18 2020-02-12 2020-01-03 2020-08-10 2020-03-23 Farmer Productivity Quotations Envelope issued to the project Geowgs under Sarpang Dzongkhag. BT-MOAF-134142-GO-RFQ / procurement of Agriculture Tools and Implements: 8 nos- rooting hormone, 1 no. - Quinoa machine, 3 nos- Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 6,000.00 6,322.24 Completed 2020-01-04 2020-02-29 2019-12-25 2020-08-27 2020-06-17 Plastic sealing machine, Farmer Productivity Quotations Envelope 100kg - plastic sheet, 25 nos- copper sulfate, 50kg-lime, 1 no.-min power chain, 21- brush and etc. BT-MOAF-135118-GO-RFQ / Procurement of 100 nos.- plastic crates and 5 nos.- Component 3: Enhancing Request for Single Stage - One digital weighing balance to be TF / A4224 Post Open - National 3,000.00 0.00 Canceled 2020-01-05 2020-03-01 2020-08-28 Access to Markets Quotations Envelope issued to the schools and institution under the project area. BT-MOAF-135137-GO-RFQ / Procurement of Smart Irrigation Materials such as Drip Irrigation sets and pipes Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 10,500.00 0.00 Canceled 2019-12-16 2020-02-10 2020-08-08 to be used during the capacity Farmer Productivity Quotations Envelope building training to the engineers under the Project Dzongkhags. BT-MOAF-135141-GO-RFQ / Procurement of 5-nos of Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 22,500.00 0.00 Canceled 2020-01-01 2020-02-26 2020-08-24 Greenhouse to be used for Farmer Productivity Quotations Envelope National Citrus Repository. Page 8 BT-MOAF-140361-GO-RFB / Procurement of value addition equipment such as 7-Dryers, Component 3: Enhancing Single Stage - One 7 Visi Coolers, 7-Mini Flour TF / A4224 Post Request for Bids Open - National 27,000.00 0.00 Canceled 2020-01-24 2020-01-29 2020-03-11 2020-04-10 2020-05-15 2020-11-11 Access to Markets Envelope Mill, 7-Rice milling machine to be issued to farmer under the project area. BT-MOAF-141893-GO-RFQ / Procurement of four Laptops to be used by project Component 4: Project Request for Single Stage - One TF / A4224 Post Limited 4,500.00 5,149.15 Completed 2019-12-27 2019-10-22 2020-02-21 2020-02-17 2020-08-19 2020-05-13 engineers and other officials Management Quotations Envelope in Project Management Unit (FSAPP). BT-MOAF-141921-GO-RFQ / Procurement of construction Component 2: Enhancing Request for Single Stage - One materials for cardamom TF / A4224 Post Limited 3,000.00 0.00 Canceled 2020-01-27 2020-03-23 2020-09-19 Farmer Productivity Quotations Envelope repository to be installed at ARDSC at Menchuna. BT-MOAF-129203-GO-DIR / Procurement of 1000 nos- Component 1:Strengthening mandarin seedling directly TF / A4224 Post Direct Selection Direct 780.00 680.48 Completed 2020-04-15 2019-09-12 2020-04-20 2019-10-17 2020-05-25 2019-10-17 2020-11-21 2020-06-01 Farmer and Producer Groups from Government Authorized dealers. BT-MOAF-133725-GO-DIR / Procurement of 15 meters- 2.5 kg HDPE pipe, 500 meters- Component 2: Enhancing TF / A4224 Post Direct Selection Direct 5,300.00 415.45 Completed 2019-12-09 2020-06-01 2019-12-14 2020-05-04 2020-01-18 2020-06-08 2020-07-16 2020-06-30 12.5 PN HDPE pipes, 450 Nos- Farmer Productivity 75 mm HDPE pipes and 400 meters- 12.5 PN HDPE pipes. BT-MOAF-133727-GO-DIR / Procurement of 1515 cft-sand and 98 cft timbers for construction of bio digester Component 2: Enhancing TF / A4224 Post Direct Selection Direct 700.00 31.18 Completed 2020-02-06 2019-12-02 2020-02-11 2019-12-02 2020-03-17 2020-01-08 2020-09-13 2020-01-30 directly from Natural Farmer Productivity Resources Development Corparation Ltd (Government approved rates) BT-MOAF-133410-GO-DIR / Procurement of seeds and seedlings (3050 packets- summer vegetable seeds, Component 2: Enhancing TF / A4224 Post Direct Selection Direct 10,000.00 7,504.58 Completed 2019-11-21 2020-01-30 2019-11-26 2020-01-30 2019-12-31 2020-06-02 2020-06-28 2020-06-30 500kg-upland paddy, 1150kg- Farmer Productivity legumes, 3500 nos-citrus, 1430 pkts- commercial veg. seeds) BT-MOAF-134150-GO-DIR / Procurement of Quinoa seeds Component 2: Enhancing TF / A4224 Post Direct Selection Direct 600.00 539.59 Completed 2020-01-15 2020-03-02 2020-01-20 2020-03-05 2020-02-24 2020-03-31 2020-08-22 2020-06-11 directly from the farmers to Farmer Productivity be issued to project Gewogs. BT-MOAF-133417-GO-DIR / Procurement of 50 bags- cement directly from the Component 3: Enhancing TF / A4224 Post Direct Selection Direct 100.00 349.77 Completed 2019-11-28 2020-06-02 2019-12-03 2020-06-03 2020-01-07 2020-06-09 2020-07-05 2020-06-09 agent to be used for Access to Markets construction of marketing structures. BT-MOAF-141919-GO-DIR / Direct procurement of various cardamom seeds: 1 kilogram Component 2: Enhancing Barlangay, 5-Cardamom TF / A4224 Post Direct Selection Direct 700.00 0.00 Canceled 2020-02-06 2020-02-11 2020-03-17 2020-09-13 Farmer Productivity Sucker, 5-Cardamom golsey and 5-cardamom Sawsey to be used in ARDSC Menchuna. BT-MOAF-133606-GO-DIR / Procurement of HDPE pipes: Component 2: Enhancing TF / A4224 Post Direct Selection Direct 8,800.00 6,249.83 Completed 2020-02-10 2020-03-20 2020-02-15 2020-02-14 2020-03-21 2020-03-31 2020-09-17 2020-06-15 680: HDPE pipe (110mm) and Farmer Productivity 680m: HDPE pipe (63mm) BT-MOAF-134023-GO-DIR / Procurement of 3000 nos of black pepper seedlings Component 2: Enhancing TF / A4224 Post Direct Selection Direct 736.00 798.29 Completed 2020-05-01 2020-05-11 2020-05-06 2020-05-12 2020-06-10 2020-05-12 2020-12-07 2020-06-15 directly from the supplier to Farmer Productivity further issue to other farmers under the project gewogs. BT-MOAF-130542-GO-DIR / Procurement of seeds 200 packets - cabbage, 200 packets-radish, 250 packets- broccoli, 200 packets-onion, Component 2: Enhancing 200 packets-tomato, 250 TF / A4224 Post Direct Selection Direct 4,500.00 6,795.66 Completed 2019-12-18 2019-09-26 2019-12-23 2019-10-02 2020-01-27 2019-10-14 2020-07-25 2020-06-10 Farmer Productivity packets-pea, 200 packets- chilli, 230 packest- cauliflower, beans, lettuce, carrot, pumpkin, water melon and bitter guard. BT-MOAF-188064-GO-RFQ / Procurement of 16 Laptops Component 4: Project Request for Single Stage - One and one photocopy machine TF / A4224 Post Open - National 14,000.00 15,920.56 Completed 2020-11-04 2020-12-30 2020-11-18 2021-06-28 2021-02-01 Management Quotations Envelope to be issued to the Project Gewog Officials. BT-MOAF-129208-GO-RFQ / rocurement of 3 sets - solar fence energizer inclusive of Component 1:Strengthening Request for Single Stage - One solar fencing wire (3000m) TF / A4224 Post Limited 2,300.00 0.00 Canceled 2019-11-27 2020-01-22 2020-07-20 Farmer and Producer Groups Quotations Envelope and solar power tester to be issued to Haa and Chhukha Dzongkhag Project Gewogs. BT-MOAF-99088-GO-DIR / Direct procurement of Component 2: Enhancing TF / A4224 Post Direct Selection Direct 600.00 0.00 Canceled 2019-02-22 2019-02-27 2019-04-03 2019-09-30 Vegetable seeds from the Farmer Productivity National seed Centre. Page 9 BT-MOAF-229396-GO-RFQ / Pending Procurement of Mushroom Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 18,000.00 0.00 Implementati 2021-09-21 2021-11-16 2022-05-15 Spawn Products for Youth Farmer Productivity Quotations Envelope on Enterprise. BT-MOAF-229398-GO-RFQ / Pending Procurement of Cropcut Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 15,000.00 0.00 Implementati 2021-09-27 2021-11-22 2022-05-21 Instruments/GPS to be issued Farmer Productivity Quotations Envelope on to project Gewogs. BT-MOAF-229399-GO-RFQ / Procurement of 300 Nos of Pending Component 3: Enhancing Request for Single Stage - One foldable plastic crates to be TF / A4224 Post Open - National 10,000.00 0.00 Implementati 2021-09-04 2021-10-30 2022-04-28 Access to Markets Quotations Envelope supplied to all the FSAPP on Dzongkhags. BT-MOAF-236274-GO-RFQ / Pending Procurement of 100 numbers Component 3: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 5,000.00 0.00 Implementati 2021-09-28 2021-11-23 2022-05-22 of Digital Weighing Balance to Access to Markets Quotations Envelope on be issued to Project Gewogs. BT-MOAF-236744-GO-RFB / Procurement of 1000 Pending Component 2: Enhancing Single Stage - One numbers of Greenhouse and TF / A4224 Post Request for Bids Open - International 1,208,761.00 0.00 Implementati 2021-08-26 2021-08-31 2021-10-12 2021-11-11 2021-12-16 2022-06-14 Farmer Productivity Envelope 1000 drip sets to be issued to on Project Dzongkhags. BT-MOAF-238504-GO-DIR / Procurement of Vegetable Pending Component 3: Enhancing Drying Facilities to be TF / A4224 Post Direct Selection Direct 13,556.00 0.00 Implementati 2021-08-05 2021-08-10 2021-09-14 2022-03-13 Access to Markets established at Damchu under on Chhukha Dzongkhag. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-MOAF-99086-NC-RFB / Procurement of Quinoa Poster Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 1,500.00 3,910.21 Completed 2019-04-07 2019-06-02 2018-02-05 2019-11-29 2018-06-20 Printing Services for ARDC, Farmer Productivity Quotations Envelope Yusipang. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS4 / Annual Outcome and Component 1:Strengthening Quality And Cost- / Post Open - National 5,000.00 0.00 Canceled 2017-04-01 2017-04-22 2017-06-05 2017-07-03 2017-08-02 2017-09-06 2017-10-11 2018-01-11 beneficiary surveys Farmer and Producer Groups Based Selection BT-MOAF-66724-CS-QCBS / Consultant Hiring of consultant firm to Component 1:Strengthening TF / A4224 Post Qualification Open - National 14,000.00 0.00 Canceled 2018-06-25 2018-06-01 2018-06-29 2018-06-27 2018-08-12 2018-07-02 2018-09-11 2018-09-25 2018-10-16 2019-04-14 study the Project Baseline Farmer and Producer Groups Selection Study for the FSAPP, Project. CS3 / Baseline and impact Component 1:Strengthening Quality And Cost- studies for Monitoring and / Post Open - National 30,000.00 0.00 Canceled 2017-01-31 2018-04-25 2017-02-21 2017-04-06 2018-06-04 2017-05-04 2018-06-18 2017-06-03 2018-06-29 2017-07-08 2018-07-20 2017-08-12 2017-12-10 Farmer and Producer Groups Based Selection Evaluation BT-MOAF-75483-CS-CQS / Hiring of Consultant for Project Baseline Study. The Consultant Component 1:Strengthening Method followed is Consultant TF / A4224 Post Qualification Open - National 30,000.00 23,927.37 Completed 2018-11-22 2018-09-07 2018-12-13 2019-01-26 2018-09-14 2019-02-25 2018-09-20 2019-04-01 2018-10-03 2019-09-28 2019-04-17 Farmer and Producer Groups Qualification Selection as the Selection PMU could hire a consultant using QCBS method. BT-MOAF-79529-CS-QCBS / Hiring of Consultant to Carry Component 3: Enhancing Quality And Cost- out Value Chain Studies of the TF / A4224 Post Open - National 31,000.00 25,753.53 Completed 2018-12-03 2019-04-26 2018-12-24 2019-02-06 2019-06-12 2019-03-06 2019-06-19 2019-04-05 2019-06-25 2019-05-10 2019-07-12 2019-06-14 2019-08-15 2020-06-13 2019-10-15 Access to Markets Based Selection two specified Agriculture Commodities. BT-MOAF-135133-CS-QCBS / Hiring of consultant to develop Project Monitoring Component 4: Project Quality And Cost- Information System (MIS) to TF / A4224 Post Open - National 15,000.00 0.00 Canceled 2019-12-15 2020-01-05 2020-02-18 2020-03-17 2020-04-16 2020-05-21 2020-06-25 2021-06-25 Management Based Selection efficiently monitor the activities under this project (FSAPP). BT-MOAF-135135-CS-QCBS / Procurement of consultancy Component 4: Project Quality And Cost- firm to develop the document TF / A4224 Post Open - National 30,000.00 0.00 Canceled 2020-04-01 2020-04-22 2020-06-05 2020-07-03 2020-08-02 2020-09-06 2020-10-11 2021-10-11 Management Based Selection for mid term review of the FSAPP project. BT-MOAF-140360-CS-QCBS / Hiring of Consultant to Component 1:Strengthening Quality And Cost- develop online Farmer Groups TF / A4224 Post Open - National 15,000.00 0.00 Canceled 2019-12-26 2020-01-16 2020-02-29 2020-03-28 2020-04-27 2020-06-01 2020-07-06 2021-07-06 Farmer and Producer Groups Based Selection and Cooperatives Registration System. BT-MOAF-191163-CS-CQS / Hiring of Consultant to produce Audio-Visual on Consultant Component 2: Enhancing Pesticides Management to TF / A4224 Post Qualification Open - National 12,000.00 10,890.54 Completed 2020-11-12 2020-01-24 2020-12-03 2021-01-16 2020-02-13 2021-02-15 2020-02-16 2021-03-22 2020-04-16 2021-09-18 2020-06-30 Farmer Productivity create awareness on use of Selection pesticides and its impact on human health. BT-MOAF-236740-CS-CQS / Hiring of consultant to Consultant produce a documentary film Component 1:Strengthening Pending TF / A4224 Post Qualification Open - National 15,000.00 0.00 2021-08-05 2021-08-26 2021-10-09 2021-11-08 2021-12-13 2022-06-11 on Food for Health to create Farmer and Producer Groups Implementation Selection public awareness on Dietary Diversity. Page 10 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS1 / Translation and Individual printing of materials for Component 1:Strengthening / Post Consultant Open - National 2,000.00 0.00 Canceled 2016-12-01 2017-01-19 2017-02-09 2017-03-16 2017-09-12 farmer group formation and Farmer and Producer Groups Selection strengthening CS2 / Development and Individual translation of materials for Component 1:Strengthening / Post Consultant Open - National 5,000.00 0.00 Canceled 2016-12-01 2017-01-19 2017-02-09 2017-03-16 2017-05-16 linking Pos with School meal Farmer and Producer Groups Selection programmes for DDS CS6 / Development of Individual materials (Digital Green) for Component 1:Strengthening / Post Consultant Open - National 36,000.00 0.00 Canceled 2017-04-01 2017-05-20 2017-06-10 2017-07-15 2018-01-11 Awareness raising for dietray Farmer and Producer Groups Selection diversity Component 1:Strengthening CS7 / FAO TA TF / A4224 Prior Direct Selection Direct 1,222,202.00 1,152,911.00 Signed 2017-01-31 2017-11-21 2017-02-10 2017-05-10 2017-04-16 2017-08-01 2017-10-13 Farmer and Producer Groups BT-MOAF-54815-CS-CDS / Component 1:Strengthening Project Baseline Study (Direct TF / A4224 Prior Direct Selection Direct 14,000.00 0.00 Canceled 2018-03-21 2018-03-31 2018-06-04 2018-12-01 Farmer and Producer Groups Selection) Individual BT-MOAF-60198-CS-INDV / Component 1:Strengthening TF / A4224 Post Consultant Limited 14,000.00 0.00 Canceled 2018-04-26 2018-04-25 2018-05-01 2018-05-21 2018-05-22 2018-06-26 2018-12-23 Project Baseline Study Farmer and Producer Groups Selection BT-MOAF-104512-CS-INDV / Hiring of Individual Consultant to develop the project webiste to enable the Individual Component 4: Project project publish proceedings, TF / A4224 Post Consultant Limited 1,500.00 1,114.40 Completed 2019-03-20 2019-03-19 2019-03-25 2019-03-22 2019-04-15 2019-04-22 2019-05-20 2018-10-03 2019-11-16 2019-04-17 Management annual agriculture highlights, Selection Meetings Minutes, research papers, brochures, downloads, Technical information etc. Page 11 TANZANIA NATIONAL ROADS AGENCY Procurement Plan I. General 1. Project Information Country: Tanzania Project Name: Dar es Salaam Urban Transport Improvement Project Project ID: P150937 2. Project Implementation Agency: Tanzania National Roads Agency 3. Date of the Procurement Plan: March 17, 2017 4. Period Covered by this procurement plan: First 18 Months II. Thresholds for Prior Review, Procurement Approaches and Methods A. Goods, Works and Non-Consulting Services Procurement Approaches and Methods Prior (US$ millions) Review Category Open Open Request for (US$ millions) International National Quotation (RfQ) Works ≥ 15 ≥ 15.0 < 15 ≤ 0.2 Goods, IT, and non-consulting ≥4 ≥5 <5 ≤ 0.1 services B. Consulting Services Category Prior Short List of National Consultants (US$ Review (US$ million) millions) Consulting Engineering and Services Construction Supervision Consultants ≥2 ≤ 0.3 ≤ 0.3 (Firms) Individual ≥ 0.4 NA. NA. Consultants [Overall Project Procurement Risk is MODERATE] 1 Notes: Terms of Reference: Terms of Reference for all contracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Consultancy Service for Contracts estimated to cost US$ 300,000 equivalent and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of wide circulation and/or Regional News Paper(s) 2 PROCUREMENT Tanzania : Dar es Salaam Urban Transport Improvement Project PLAN General Information Country: Tanzania Bank’s Approval Date of the Original Procurement Plan: 2017-08-18 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150937 GPN Date: Project Name: Dar es Salaam Urban Transport Improvement Project Loan / Credit No: IDA / 59570 Dar Rapid Transit Agency Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component C: Institutional TZ-DART-48201-GO-RFB / Strengthening and Reform, Single Stage - One IDA / 59570 Post Request for Bids Open - National 155,573.55 Signed 2018-01-08 2018-01-11 2018-01-11 2018-02-09 2018-02-09 2018-03-11 2018-03-28 2018-04-15 2018-11-09 2018-08-13 Supply of ICT Equipment ICT Innovation, Safety Net, Envelope and Transport Studies Component C: Institutional TZ-DART-65759-GO-RFQ / Strengthening and Reform, Request for Single Stage - One IDA / 59570 Post Limited 10,287.71 Completed 2018-05-22 2018-05-23 2018-08-07 2018-07-13 2019-02-03 2018-10-03 Supply of Furniture ICT Innovation, Safety Net, Quotations Envelope and Transport Studies Component C: Institutional TZ-DART-76625-GO-UN / Strengthening and Reform, UN Agencies IDA / 59570 Post Direct 52,229.52 Signed 2018-09-05 2018-10-23 2018-09-12 2018-09-07 2018-10-25 2018-11-01 2019-02-22 Supply of One Vehicle ICT Innovation, Safety Net, (Direct) and Transport Studies Component C: Institutional Pending TZ-DART-111723-GO-RFQ / Strengthening and Reform, Request for Single Stage - One IDA / 59570 Post Limited 0.00 Implementati 2019-05-04 2019-06-29 2019-07-29 Supply of ICT Equipment ICT Innovation, Safety Net, Quotations Envelope on and Transport Studies TZ-DART-162265-GO-RFB / Supply of ICT Equipment for Component C: Institutional Pending Emme Travel Demand Strengthening and Reform, Single Stage - One IDA / 59570 Post Request for Bids Open - National 0.00 Implementati 2020-04-07 2020-04-12 2020-05-12 2020-06-11 2020-07-16 2020-11-13 Forecasting System and ICT Innovation, Safety Net, Envelope on Automated Fare Collection and Transport Studies System (AFCS) Component C: Institutional TZ-DART-238380-GO-RFQ / Pending Strengthening and Reform, Request for Single Stage - One SUPPLY OF ICT AND OFFICE IDA / 59570 Post Limited 0.00 Implementati 2021-06-14 2021-08-09 2022-02-05 ICT Innovation, Safety Net, Quotations Envelope EQUIPMENT on and Transport Studies NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-DART-74594-NC-RFB / Component C: Institutional Provision of Security Services Strengthening and Reform, Single Stage - One IDA / 59570 Post Request for Bids Open - National 638,583.28 Signed 2018-05-03 2018-03-28 2018-05-03 2018-05-21 2018-05-21 2018-06-18 2018-06-18 2018-07-27 2018-09-28 2019-07-27 for Dart Stations, Terminals ICT Innovation, Safety Net, Envelope and Jangwani Depot and Transport Studies Component C: Institutional TZ-DART-79024-NC-RFB / Under Strengthening and Reform, Single Stage - One Procurement of Cleaning IDA / 59570 Post Request for Bids Open - National 0.00 Implementati 2018-12-13 2019-01-04 2018-12-18 2019-01-16 2019-01-08 2019-01-22 2019-02-26 2019-08-25 ICT Innovation, Safety Net, Envelope Services on and Transport Studies TZ-DART-132998-NC-RFQ / Component C: Institutional PROVISION OF CLEANING Pending Strengthening and Reform, Request for Single Stage - One SERVICES TO ALL TEMINALS IDA / 59570 Post Limited 0.00 Implementati 2019-09-11 2019-11-06 2020-05-04 ICT Innovation, Safety Net, Quotations Envelope AND MAIN OFFICE FOR DAR on and Transport Studies RAPID TRANSIT CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-DART-25359-CS-QCBS / Transaction Advisory Services for Consolidation of Minibus Component C: Institutional (Daladala) Owners to Form Strengthening and Reform, Quality And Cost- IDA / 59570 Prior Open - International 3,528,762.36 Signed 2013-02-19 2013-03-12 2013-05-21 2013-06-18 2013-06-13 2013-10-14 2014-01-02 2017-08-22 2014-03-12 2014-01-15 2015-03-12 BRT Operating Company and ICT Innovation, Safety Net, Based Selection for Processing Competitive and Transport Studies Selection of Phase 3 and 4 BRT Operators TZ-DART-35414-CS-QCBS / Component C: Institutional DART Management support Strengthening and Reform, Quality And Cost- IDA / 59570 Prior Open - International 4,832,707.79 Signed 2016-12-21 2017-01-13 2017-11-20 2018-05-27 2017-12-18 2018-07-27 2018-01-17 2018-09-23 2018-02-21 2018-12-03 2018-03-28 2019-06-26 2019-03-28 for the Operation of Dar Rapid ICT Innovation, Safety Net, Based Selection Transit Project Phase 1 and Transport Studies TZ-DART-50357-CS-QCBS / Component C: Institutional Consultancy Services for Strengthening and Reform, Quality And Cost- IDA / 59570 Prior Open - International 1,939,638.55 Signed 2018-02-26 2018-02-26 2018-03-19 2018-03-15 2018-06-02 2019-02-26 2018-06-30 2019-04-24 2018-07-30 2019-08-23 2018-09-03 2020-01-21 2018-10-08 2020-08-10 2019-10-08 Transaction Advisory for BRT ICT Innovation, Safety Net, Based Selection Phase 3 and 4 Operations and Transport Studies Page 1 TZ-DART-100733-CS-QCBS Component C: Institutional / CONSULTANCY SERVICES Strengthening and Reform, Quality And Cost- Under FOR OUTPUT PERFORMANCE IDA / 59570 Prior Open - International 0.00 2019-03-25 2019-06-26 2019-04-15 2019-05-29 2019-10-30 2019-06-26 2019-12-19 2019-07-26 2020-03-16 2019-08-30 2019-10-04 2020-10-03 ICT Innovation, Safety Net, Based Selection Implementation BASED MAINTANANCE and Transport Studies CONTRACT TZ-DART-190392-CS-CQS / Consultancy Services for Component C: Institutional Consultant Structural Assessment and Strengthening and Reform, IDA / 59570 Post Qualification Open - National 0.00 Canceled 2020-09-04 2020-09-15 2020-09-04 2020-09-24 2020-09-18 2020-10-09 2020-11-13 2021-05-12 Design of Renovation Works ICT Innovation, Safety Net, Selection for Proposed DART Conrol and Transport Studies Centre. TZ-DART-236863-CS-QCBS / Consultancy Services for Component C: Institutional Structural Assessment and Strengthening and Reform, Quality And Cost- Under IDA / 59570 Prior Open - National 0.00 2021-06-03 2021-06-17 2021-06-24 2021-06-21 2021-08-07 2021-09-04 2021-10-04 2021-11-08 2021-12-13 2022-12-13 Design of Renovation Works ICT Innovation, Safety Net, Based Selection Implementation for proposed DART Control and Transport Studies Centre INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-DART-25361-CS-INDV / Individual Consultant for Component C: Institutional Scoping of Intelligent Individual Strengthening and Reform, Pending Transport System (ITS) and IDA / 59570 Post Consultant Open 0.00 2017-09-04 2017-10-23 2017-11-13 2017-12-18 2018-06-16 ICT Innovation, Safety Net, Implementation Automated fare Collection Selection and Transport Studies System (AFCS) for DART Phase 1. TZ-DART-27722-CS-CDS / Component C: Institutional Consultancy Services for Strengthening and Reform, Travel Demand Model Update IDA / 59570 Prior Direct Selection Direct 984,326.41 Signed 2017-09-11 2017-09-14 2017-10-16 2017-10-20 2017-12-27 2018-07-25 2018-06-25 ICT Innovation, Safety Net, and Estimate for BRT Phase 1- and Transport Studies 6 TZ-DART-49166-CS-CDS / Component C: Institutional Consultancy Service to Strengthening and Reform, Under Support Implementation of IDA / 59570 Post Direct Selection Direct 0.00 2018-02-19 2018-02-22 2018-02-24 2018-04-30 2018-10-27 ICT Innovation, Safety Net, Implementation DART Agency Organisational and Transport Studies Reforms TZ-DART-50362-CS-INDV / Component C: Institutional Consultancy Services to Individual Strengthening and Reform, Under Support DART in the IDA / 59570 Post Consultant Limited 0.00 2018-02-26 2018-02-22 2018-03-09 2018-03-30 2018-05-04 2018-10-31 ICT Innovation, Safety Net, Implementation Demarcation of Jangwani Selection and Transport Studies Depot Component C: Institutional TZ-DART-57117-CS-INDV / Individual Strengthening and Reform, Pending Consultancy Services on Social IDA / 59570 Post Consultant Limited 0.00 2018-04-06 2018-04-11 2018-05-02 2018-06-06 2018-12-03 ICT Innovation, Safety Net, Implementation Media Selection and Transport Studies Component C: Institutional TZ-DART-92127-CS-INDV / Individual Strengthening and Reform, Pending Consultancy Services for IDA / 59570 Post Consultant Limited 0.00 2018-08-06 2018-08-27 2018-12-28 2019-02-01 2019-07-31 ICT Innovation, Safety Net, Implementation Depot Consultant Selection and Transport Studies TZ-DART-187530-CS-CDS / Consultancy Services for the support of in house Component C: Institutional Development and Strengthening and Reform, IDA / 59570 Post Direct Selection Direct 500,000.00 Signed 2020-08-12 2020-08-27 2020-08-22 2020-09-14 2020-10-26 2020-12-31 2021-04-24 Implementation of ICT Innovation, Safety Net, Government Automated Fare and Transport Studies Collection System (AFCS ) for DART System Phase I Page 2 PROJET DE DEVELOPPEMENT DES AMENAGEMENTS HYDROELECTRIQUES DE JIJI ET MULEMBWE Projet de Plan de Passation des Marchés, simplifié I. Travaux. 1 2 3 4 5 6 7 8 R Description Coût Métho Pré- Préféren Revue Date ef du Contrat estimé de de qualific ce par les prévue . (en passat ation nationale Bailleur pour N milliers ion (oui/no (oui/non) s l’ouverture o. de US$) des n) (à Priori des march /à soumission és Postério s ri) 1 Aménagemen 189,000 AOI NON NON PRIORI DECEMBRE t des 2014 Centrales hydroélectriq ues de Jiji et Mulembwe 2 Construction 22,000 AOI NON NON PRIORI DECEMBRE des postes 2014 HT/MT 3 Construction 22,000 AOI NON NON PRIORI DECEMBRE des lignes HT 2014 4 Electrification 1,200 AON NON NON POSTERI AVRIL 2016 des centres ORI environnants 5 Adduction 300 AON NON NON POSTERI MAI 2016 d’Eau Potable ORI (AEP) des centres environnants 6 Construction 1,300 AON NON NON POSTERI NOVEMBRE des maisons ORI 2014 pour les personnes affectées Page 1 sur 5 II. Fournitures 1 2 3 4 5 6 7 8 R Description Coût Méth Pré- Préfére Revue Date prévue ef du Contrat estimé ode qualifi nce par les pour . (en de cation nationa Bailleurs l’ouverture N milliers passa (oui/n le (à Priori / des o. de US$) tion on) (oui/no à soumissions des n) Postérior march i) és 1 Acquisition 500 AON NON NON POSTERI OCTOBRE des vivres ORI 2014 pour une aide alimentaire des personnes vulnérables et affectées 2 Equipements 300 AON NON NON PRIORI OCTOBRE pour l’UEP 2014 (mobilier de bureau ; véhicules, technologie de l'information) Page 2 sur 5 III. Sélection de Consultants 1 2 3 4 5 6 Ref. Description du Coût Métho Revue par Date No. contrat estimé de de les prévue de (en sélecti Bailleurs soumission millier on (à Priori /à des s de Postériori) proposition US$) s 1 Ingénieur Conseil 9,600 SFQC PRIORI AVRIL 2014 2 Revue de la 70 CI PRIORI MARS 2014 conception du barrage Jiji (mission ponctuelle) ; Trois consultants individuels) 3 Panel (3 experts) 200 CI PRIORI MAI 2014 pour la sécurité des barrages 4 Panel (2 experts) 130 CI PRIORI MAI 2014 pour les aspects environnementaux et sociaux 5 Etudes de faisabilité 2,300 SFQC PRIORI SEPTEMBRE (aménagements 2015 hydroélectriques; ressources géothermique; réseaux électriques y compris l’extension des lignes MT et doublement de la ligne 110 kV RN1- Bubanza, et autres) 6 Appui à 500 SFQC PRIORI AVRIL 2015 l’amélioration de la gouvernance et la réorganisation de la REGIDESO y compris les aspects légaux et réglementaires 7 Système 600 SFQC PRIORI JUIN 2015 d'Information Géographique des Installations et Page 3 sur 5 1 2 3 4 5 6 Ref. Description du Coût Métho Revue par Date No. contrat estimé de de les prévue de (en sélecti Bailleurs soumission millier on (à Priori /à des s de Postériori) proposition US$) s abonnés de la REGIDESO (SGI) Audit financier du JUILLET 8 30 SMC POSTERIORI PPF 2014 9 Audits financiers des 60 SMC POSTERIORI NOVEMBRE exercices 2015 et 2015 2016 10 Appui à la mise en 200 SFQC PRIORI OCTOBRE œuvre des mesures 2014 Commented [KOS1]: Quelles sont ces “mesures” exactement?? d'accompagnement pour les personnes affectées (PAP) 11 Appui à la gestion 100 CI PRIORI MARS 2014 financière de l’UEP 12 Appui au 100 CI PRIORI JUIN 2014 département passation des marchés de l’UEP 13 Appui aux aspects 100 CI PRIORI MAI 2014 environnementaux et sociaux de l’UEP 14 Appui à la Direction 200 CI PRIORI DECEMBRE Générale et à l’UEP 2014 15 Appui à l’exécution 50 CI POSTERIORI JUIN 2014 d’action ponctuelle pour éliminer les problèmes liés à la mise en place des compteurs à prépaiement 16 Appui à la mise en 80 CI POSTERIORI NOVEMBRE place des réformes 2014 du cadre légal et réglementaire du secteur de l’électricité 17 Appui à 50 CI POSTERIORI AVRIL 2014 l’indentification, Page 4 sur 5 1 2 3 4 5 6 Ref. Description du Coût Métho Revue par Date No. contrat estimé de de les prévue de (en sélecti Bailleurs soumission millier on (à Priori /à des s de Postériori) proposition US$) s l’évaluation et les inventaires des instruments de gestion de risque perçu par les investisseurs privés 18 Appui au 100 CI PRIORI AVRIL 2015 renforcement des capacités du régulateur du secteur de l’énergie. Page 5 sur 5 PROCUREMENT Burundi : BI-Jiji and Mulembwe Hydropower PLAN General Information Country: Burundi Bank’s Approval Date of the Original Procurement Plan: 2017-12-01 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P133610 GPN Date: Project Name: BI-Jiji and Mulembwe Hydropower Loan / Credit No: IDA / H9350 Regie de Production et de Distribution d'Eau et d'Electricité Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component A: Hydropower IA2 / Construction des postes Single Stage - One 22,000,000.0 2020-11- IDA / H9350 Facilities and Electricity Prior Request for Bids Open - International 0.00 Canceled 2015-08-11 2017-02-20 2017-12-07 2016-02-09 2018-03-07 2018-10-03 2019-01-02 HT/MT Envelope 0 24 Services IA1 / Aménagements des Component A: Hydropower Single Stage - One 189,000,000. 154,654,84 2021-09- Centrales hydroélectriques de IDA / H9350 Facilities and Electricity Prior Request for Bids Open - International Signed 2014-10-22 2018-01-25 2015-06-12 2016-10-20 2015-02-10 2017-06-12 2017-06-12 2017-11-20 2018-09-13 2018-02-13 2018-10-17 Envelope 00 4.00 20 Jiji et Mulembwe Services Component A: Hydropower IA2A / Construction des Single Stage - One 22,000,000.0 2021-06- IDA / H9350 Facilities and Electricity Prior Request for Bids Open - International 0.00 Canceled 2018-11-30 2019-05-27 2019-03-11 2019-12-27 2019-03-29 2020-08-10 2018-12-31 2019-06-21 2019-06-12 2021-01-05 2019-07-19 2021-03-05 2019-09-05 postes HT/MT Envelope 0 26 Services Component A: Hydropower Under IA3A / Construction des Single Stage - One 19,400,000.0 2021-05- IDA / H9350 Facilities and Electricity Prior Request for Bids Open - International 0.00 Implementat 2018-11-30 2019-05-27 2019-02-14 2019-12-28 2019-02-14 2020-09-10 2018-12-04 2019-07-18 2019-04-25 2021-03-17 2019-05-06 2019-07-30 lignes HT Envelope 0 20 Services ion Component A: Hydropower IA3 / Construction des lignes Single Stage - One 22,000,000.0 2020-11- IDA / H9350 Facilities and Electricity Prior Request for Bids Open - International 0.00 Canceled 2015-08-12 2016-07-19 2017-05-05 2016-02-09 2018-04-08 2018-07-09 2018-10-05 HT Envelope 0 05 Services Component A: Hydropower IA2B / Construction des Single Stage - One Other (with field 22,000,000.0 Under 2023-04- IDA / H9350 Facilities and Electricity Prior Request for Bids Open - International 0.00 2021-06-30 2021-07-05 2021-09-03 2021-09-24 2021-10-08 postes HT/MT Envelope for explanation) 0 Review 01 Services GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IB11 / Acquisition et Component C: Power Sector installation du système de Single Stage - One IDA / H9350 Reform and Institutional Prior Request for Bids Open - International 1,800,000.00 0.00 Canceled 2018-10-25 2018-11-22 2019-01-07 2019-02-06 2019-03-13 2020-03-12 gestion (REP, système Envelope Development commercial, etc) 1er phase IB13 / Fourniture, Component C: Power Sector installation et mise en Single Stage - One IDA / H9350 Reform and Institutional Post Request for Bids Open - International 1,000,000.00 942,573.00 Signed 2018-12-21 2019-01-09 2019-01-04 2019-04-12 2019-02-18 2019-06-24 2019-03-20 2019-10-25 2019-04-24 2020-01-10 2019-10-21 exploitation d'un systeme de Envelope Development comptage intelligent (PPR) IB16 / Fourniture et Component B: Technical Pending Single Stage - One installation d'un équipement IDA / H9350 Assistance for Physical Post Request for Bids Open - National 80,000.00 0.00 Implementati 2021-06-18 2021-06-23 2021-07-28 2021-08-07 2021-08-13 2022-02-09 Envelope de vidéoconference Infrastructure on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IB12 / Mise à jour du logiciel Component B: Technical TOMPRO et mise à niveau des IDA / H9350 Assistance for Physical Post Direct Selection Direct 20,000.00 11,190.27 Completed 2018-10-23 2018-10-22 2018-10-28 2018-08-13 2018-11-11 2018-12-03 2019-01-10 2019-01-31 utilisateurs du PHJIMU Infrastructure IB14 / Fourniture, installation et mise en exploitation d'un Component C: Power Sector système d'information de Single Stage - One IDA / H9350 Reform and Institutional Prior Request for Bids Open - International 7,000,000.00 5,988,326.15 Signed 2018-12-21 2019-05-27 2019-01-04 2019-09-12 2019-02-18 2019-10-17 2019-03-20 2020-01-09 2019-05-08 2020-02-04 2019-11-04 gestion intégré a un système Envelope Development d'information géographique (SIG/SIG) IB15 / Nouveau paramétrage Component B: Technical et contrat de maintenance du IDA / H9350 Assistance for Physical Post Direct Selection Direct 10,000.00 2,610.48 Signed 2020-06-15 2020-06-24 2020-06-20 2020-06-24 2020-07-02 2020-08-03 2020-12-29 logiciel TOMPRO Infrastructure CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component B: Technical IC16 / Audit financier des Least Cost IDA / H9350 Assistance for Physical Post Open - International 60,000.00 48,100.00 Signed 2017-12-20 2017-11-02 2018-01-09 2018-02-08 2018-02-15 2018-03-28 2018-03-17 2018-04-25 2018-04-11 2018-05-02 2018-05-05 2018-05-09 2018-05-15 2018-05-18 2018-07-14 exercices 2017,2018 et 2019 Selection Infrastructure Component C: Power Sector IC15 / Appui à l'élaboration Quality And Cost- IDA / H9350 Reform and Institutional Post Open - International 200,000.00 160,009.58 Completed 2017-09-07 2017-07-20 2017-09-07 2018-01-22 2018-01-05 2018-02-07 2018-02-07 2018-03-14 2018-03-22 2018-04-18 2018-05-15 2018-05-23 2018-08-22 2019-05-23 2019-09-30 du Code réseau du Burundi Based Selection Development IC14 / Etude des érosions et des dynamiques des Component B: Technical sédiments en amont des Quality And Cost- IDA / H9350 Assistance for Physical Post Open - International 200,000.00 191,977.11 Completed 2017-04-27 2016-08-10 2017-04-27 2017-08-30 2017-09-11 2017-10-12 2017-10-12 2017-12-18 2017-12-18 2018-01-03 2018-01-03 2018-02-01 2018-01-31 2018-07-01 2019-01-31 aménagements Based Selection Infrastructure hydroélectriques de Jiji et Mulembwe Page 1 IC18 / Densification de Bujumbura ,Electrification de Component B: Technical 28 chefs lieux des communes Quality And Cost- IDA / H9350 Assistance for Physical Prior Open - International 800,000.00 292,451.12 Signed 2018-10-22 2018-10-29 2018-11-12 2018-11-21 2019-01-25 2019-05-10 2019-02-24 2019-06-18 2019-04-05 2019-10-17 2019-06-02 2020-01-21 2019-07-13 2020-01-24 2020-02-08 non encore électrifiées et Based Selection Infrastructure renforcement du réseau MT 30kV à l'échelle nationale IC20 / Appui à l'audit comptable et financier de la Component C: Power Sector Least Cost Under REGIDESO relatif à l'exercice IDA / H9350 Reform and Institutional Post Open - International 100,000.00 87,850.00 2018-12-07 2018-12-17 2018-12-21 2019-02-07 2018-12-22 2019-03-07 2019-01-28 2019-03-28 2019-03-29 2019-04-21 2019-04-25 2019-04-30 2019-05-17 2019-10-27 Selection Implementation comptable 2017 et 1er Development semestre 2018 IC21 / Etudes de faisabilite, APD et DAO pour la Component B: Technical Quality And Cost- Rehabilitation et l'extension IDA / H9350 Assistance for Physical Prior Open - International 600,000.00 262,856.70 Signed 2019-04-12 2019-05-06 2019-05-03 2019-05-13 2019-06-16 2019-08-08 2019-07-14 2019-10-02 2019-08-13 2019-12-09 2019-09-17 2020-01-21 2019-10-02 2020-01-24 2020-10-01 Based Selection des infrastructures électriques Infrastructure de la ville de Bujumbura IC17 / Cabinet d'appui- conseil sur les métiers de Component C: Power Sector Quality And Cost- l'eau et de l'électricité pour la IDA / H9350 Reform and Institutional Prior Open - International 500,000.00 0.00 Canceled 2018-12-12 2019-01-02 2019-02-14 2019-04-25 2019-05-30 2019-07-22 2019-08-18 2020-08-17 Based Selection mise en oeuvre du plan Development d'affaires IC17A / Cabinet d'appui- conseil sur les métiers de Component C: Power Sector Quality And Cost- l'eau et de l'électricité pour la IDA / H9350 Reform and Institutional Prior Open - International 1,000,000.00 0.00 Canceled 2019-08-04 2019-09-13 2019-08-19 2020-01-07 2019-10-02 2020-06-14 2019-10-30 2020-08-20 2019-11-29 2020-01-03 2020-01-28 2021-01-27 Based Selection mise en oeuvre du plan Development d'affaires IC1 / Firme chargée de la surveillance des travaux des aménagements Component B: Technical Quality And Cost- hydroélectriques, de la ligne IDA / H9350 Assistance for Physical Prior Open - International 9,700,000.00 0.00 Canceled 2013-11-11 2013-11-25 2014-08-11 2014-10-28 2015-02-09 2015-03-21 2017-06-27 2021-06-27 Based Selection d’évacuation de l’énergie, des Infrastructure postes associés et du réseau secondaire de distribution IC3 / Appui à la Component C: Power Sector restructuration Quality And Cost- IDA / H9350 Reform and Institutional Prior Open - International 500,000.00 0.00 Canceled 2019-12-12 2020-01-09 2020-02-19 2020-04-15 2020-05-23 2020-07-03 2020-08-12 2021-08-12 organisationnelle de la Based Selection Development REGIDESO IC3A / Consultant Bureau en ressources humaines chargé Component C: Power Sector Consultant de la proposition de Under IDA / H9350 Reform and Institutional Post Qualification Open - International 280,000.00 0.00 2019-12-02 2019-12-16 2020-01-26 2020-02-09 2020-03-07 2020-09-03 réorganisation et sélection Implementation Development Selection des cadres dirigeants de la REGIDESO IC1A / Firme chargée de la surveillance des travaux des aménagements Component B: Technical Quality And Cost- hydroélectriques, de la ligne IDA / H9350 Assistance for Physical Prior Open - International 6,900,000.00 0.00 Under Review 2013-11-25 2021-05-20 2013-11-25 2014-08-20 2014-10-28 2015-02-27 2015-03-21 2017-06-27 2022-07-27 Based Selection d’évacuation de l’énergie, des Infrastructure postes associés et du réseau secondaire de distribution IC24 / Etudes environnementale et sociale Component B: Technical Quality And Cost- Under pour la protection des bassins IDA / H9350 Assistance for Physical Post Open - International 200,000.00 0.00 2020-10-14 2020-10-23 2020-11-04 2020-12-18 2021-01-17 2021-02-16 2021-03-23 2021-04-20 2021-10-17 Based Selection Implementation versants du projet Jiji et Infrastructure Mulembwe IC23 / Etudes de faisabilite, APD et DAO pour la Component B: Technical Rehabilitation de la route Quality And Cost- IDA / H9350 Assistance for Physical Post Open - International 200,000.00 0.00 Under Review 2020-10-22 2020-11-27 2020-11-12 2020-12-26 2021-01-23 2021-02-22 2021-03-29 2021-04-12 2021-10-09 provinciale RP 403 dan la Based Selection Infrastructure zone du projet Jiji et Mulembwe IC25 / Audit financier du Component B: Technical PHJIMU des exercices juin Least Cost Under IDA / H9350 Assistance for Physical Post Open - International 60,000.00 0.00 2021-02-22 2021-03-16 2021-03-15 2021-04-01 2021-04-28 2021-05-28 2021-06-27 2021-08-01 2021-08-15 2022-08-15 2020- juillet 2021, juin 2021 Selection Implementation Infrastructure et juillet 2022 IC26 / Recrutement d'un consultant chargé de Component B: Technical l'Inspection et élaboration Quality And Cost- Pending IDA / H9350 Assistance for Physical Post Open - International 200,000.00 0.00 2021-06-21 2021-07-12 2021-08-16 2021-09-17 2021-10-17 2021-11-21 2021-12-19 2022-12-19 DAO pour réhabilitation Based Selection Implementation Infrastructure centrales Rwegura, Nyemanga, Kayenzi, Marangara, Buhiga IC27 / Recrutement d'un Bureau pour l'Expertise du système de télécommunication du réseau Component B: Technical Quality And Cost- Pending électrique interconnecté du IDA / H9350 Assistance for Physical Post Open - International 200,000.00 0.00 2021-06-30 2021-07-21 2021-08-27 2021-09-24 2021-10-24 2021-11-28 2022-01-02 2023-01-02 Based Selection Implementation Burundi et élaboration du Infrastructure DAO pour réhabilitation et modernisation ces équipements IC28 / Recrutement d'un Consultant pour réaliser l'étude de Réhabilitation et Component B: Technical Quality And Cost- Pending renforcement des réseaux de IDA / H9350 Assistance for Physical Post Open - International 300,000.00 0.00 2021-07-15 2021-08-05 2021-09-18 2021-10-16 2021-11-15 2021-12-20 2022-01-24 2023-01-24 Based Selection Implementation transport 30 kV et des Infrastructure réseaux de distribution de Kayanza, Ngozi et Rumonge IC29 / Recrutement d'un consultant pour la mission Component B: Technical d'étude d'Électrification des Quality And Cost- Pending IDA / H9350 Assistance for Physical Post Open - National 100,000.00 0.00 2021-07-22 2021-08-12 2021-09-25 2021-10-23 2021-11-22 2021-12-27 2022-01-31 2022-07-30 centres non encore électrifiés Based Selection Implementation Infrastructure non pris en charge par le projet "Densification INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Component B: Technical Individual ID33 / Audit de la mise en IDA / H9350 Assistance for Physical Post Consultant Open 30,000.00 0.00 Canceled 2017-09-05 2020-08-26 2019-01-25 2019-03-01 2019-03-22 2019-06-20 oeuvre du PAR Infrastructure Selection ID11 / Appui à la mise en Component C: Power Sector Individual place des réformes du cadre Under IDA / H9350 Reform and Institutional Post Consultant Open 80,000.00 0.00 2017-06-21 2020-09-28 2019-01-09 2019-01-30 2019-02-23 2019-08-22 légal et réglementaire du Implementation Development Selection secteur de l’électricité ID12 / Appui à l'identification, l'évaluation et Component C: Power Sector Individual les inventaires des IDA / H9350 Reform and Institutional Post Consultant Open 50,000.00 102,019.00 Signed 2018-11-12 2020-01-10 2019-02-18 2020-03-17 2019-03-11 2020-09-10 2019-04-08 2020-09-17 2019-10-05 instruments de gestion de Development Selection risque perçu par les investisseurs privés ID30 / Appui à l'Elaboration Component C: Power Sector Individual d'un manuel des procédures IDA / H9350 Reform and Institutional Post Consultant Open 60,000.00 0.00 Canceled 2018-11-20 2019-02-12 2019-03-14 2019-03-29 2019-06-27 relatives aux PPP Development Selection Component B: Technical Individual ID35 / Appui à la IDA / H9350 Assistance for Physical Post Consultant Open 100,000.00 67,200.00 Signed 2018-10-12 2018-10-15 2018-11-22 2019-08-19 2018-12-13 2019-08-28 2018-12-28 2019-09-26 2020-12-27 Comptabilité Infrastructure Selection Component C: Power Sector Individual ID36 / Appui en Contrôle de IDA / H9350 Reform and Institutional Post Consultant Open 100,000.00 5,900.00 Signed 2019-01-14 2019-05-02 2019-02-19 2019-08-16 2019-02-26 2019-08-27 2019-03-06 2019-09-13 2019-09-02 Gestion de la REGIDESO Development Selection ID37 / Appui en Component C: Power Sector Individual Communication de la IDA / H9350 Reform and Institutional Post Consultant Open 100,000.00 60,000.00 Signed 2019-01-14 2019-05-02 2019-02-22 2019-12-26 2019-03-01 2020-01-07 2019-03-11 2020-01-10 2020-03-10 REGIDESO Development Selection ID39 / Appui à la coordination de mise en Component C: Power Sector Individual oeuvre du Plan de IDA / H9350 Reform and Institutional Post Consultant Open 100,000.00 92,400.00 Signed 2019-01-21 2019-04-23 2019-02-26 2019-08-19 2019-03-12 2019-08-27 2019-03-25 2019-09-13 2020-03-24 Restructuration de la Development Selection REGIDESO ID41 / Appui au suivi et à la Component C: Power Sector Individual mise en place du système des IDA / H9350 Reform and Institutional Post Consultant Limited 50,000.00 56,400.00 Signed 2019-07-26 2019-08-14 2019-07-31 2019-09-30 2019-08-21 2019-11-20 2019-09-11 2019-11-26 2020-03-09 compteurs intelligents Development Selection Component B: Technical Individual ID43 / Appui aux aspects IDA / H9350 Assistance for Physical Post Consultant Direct 100,000.00 119,600.00 Signed 2019-08-14 2019-10-31 2019-08-24 2019-11-04 2019-09-07 2019-11-29 2019-09-28 2019-12-18 2020-03-26 sociaux du projet Infrastructure Selection Component B: Technical Individual ID42 / Appui aux aspects IDA / H9350 Assistance for Physical Post Consultant Direct 100,000.00 178,190.00 Signed 2019-08-14 2019-09-10 2019-08-24 2019-09-17 2019-09-07 2019-10-08 2019-09-28 2019-10-22 2020-09-22 environnementaux du projet Infrastructure Selection ID40 / Appui au choix du Component C: Power Sector mode de paiements des IDA / H9350 Reform and Institutional Post Direct Selection Direct 30,000.00 16,496.01 Signed 2019-08-08 2019-08-08 2019-08-18 2019-09-09 2019-09-29 2019-09-17 2020-03-27 unités cash power et des Development factures d'eau et d'électricité ID46 / Appui à l'élaboration Component B: Technical Individual du Plan de mobilisation des IDA / H9350 Assistance for Physical Post Consultant Open 30,000.00 0.00 Canceled 2019-09-12 2019-10-15 2019-10-29 2019-11-26 2020-01-25 parties prenantes (PMPP) Infrastructure Selection ID47 / Appui à l'élaboration du Cadre de gestion sociale et Component B: Technical Individual environnementale (CGES) et IDA / H9350 Assistance for Physical Post Consultant Open 30,000.00 0.00 Canceled 2019-09-12 2019-10-02 2019-10-03 2019-10-17 2019-12-16 du Infrastructure Selection Cadre de politique de réinstallation (CPR) ID7 / Appui au Département Component B: Technical Individual Passation des Marchés de IDA / H9350 Assistance for Physical Post Consultant Open 100,000.00 0.00 Canceled 2014-04-12 2014-09-26 2014-10-24 2015-03-16 2017-12-17 l'UEP Infrastructure Selection ID29XX / Appui à la Direction Component C: Power Sector Générale de la REGIDESO IDA / H9350 Reform and Institutional Post Direct Selection Direct 100,000.00 0.00 Canceled 2016-11-08 2016-11-14 2016-12-02 2017-12-02 (2ème année) Development ID31 / Appui à l'Elaboration des contrats types entre Component C: Power Sector Individual REGIDESO, investisseurs IDA / H9350 Reform and Institutional Post Consultant Open 60,000.00 0.00 Canceled 2018-11-11 2019-02-08 2019-03-11 2019-03-25 2019-06-23 privés et l'Agence Burundaise Development Selection d'Electrification Rurale (ABER) ID48 / Appui à l'élaboration Component B: Technical Individual du cadre de planification pour IDA / H9350 Assistance for Physical Post Consultant Limited 50,000.00 16,711.77 Completed 2019-11-18 2019-11-19 2019-11-23 2019-11-21 2019-11-30 2019-11-21 2019-12-08 2019-11-21 2020-03-07 2020-01-27 les peuples Autochtones Infrastructure Selection ID49 / Appui à l'élaboration du Cadre de gestion sociale et Component B: Technical Individual environnementale (CGES) du IDA / H9350 Assistance for Physical Post Consultant Limited 30,000.00 14,076.22 Completed 2019-11-20 2019-11-21 2019-11-25 2019-11-21 2019-11-30 2019-11-21 2019-12-06 2019-11-21 2020-03-05 2020-02-21 projet "accès du Burundi à Infrastructure Selection l'énergie viable" ID50 / Appui à l'élaboration du Cadre de politique de Component B: Technical Individual réinstallation (CPR) du projet IDA / H9350 Assistance for Physical Post Consultant Limited 30,000.00 12,508.64 Signed 2019-11-20 2019-11-21 2019-11-25 2019-11-21 2019-11-30 2019-11-21 2019-12-06 2019-11-21 2020-03-05 "accès du Burundi à l'énergie Infrastructure Selection viable" ID51 / Appui à l’élaboration Component B: Technical Individual du manuel d'exécution du IDA / H9350 Assistance for Physical Post Consultant Limited 30,000.00 36,100.00 Completed 2019-11-22 2019-12-05 2019-11-27 2019-12-19 2019-12-04 2019-12-20 2019-12-14 2019-12-24 2020-03-13 2020-04-26 projet (MEP) du projet d'accès Infrastructure Selection du Burundi à l'énergie viable IC3B / Réorganisation et Component C: Power Sector actualisation des textes IDA / H9350 Reform and Institutional Post Direct Selection Direct 90,000.00 90,000.00 Signed 2020-01-08 2020-01-08 2020-01-30 2020-01-10 2020-02-19 2020-02-14 2020-06-18 regissant la REGIDESO Development Component C: Power Sector Individual ID52 / Conseiller IDA / H9350 Reform and Institutional Post Consultant Limited 40,000.00 34,150.00 Signed 2020-01-10 2020-01-10 2020-01-15 2020-01-17 2020-01-22 2020-01-17 2020-01-30 2020-01-20 2020-07-28 Structuration REGIDESO Development Selection Page 3 ID53 / Appui à l'exploitation Component C: Power Sector Individual des outils de réforme de la IDA / H9350 Reform and Institutional Post Consultant Limited 100,000.00 80,963.68 Signed 2020-01-16 2020-01-17 2020-01-19 2020-01-24 2020-01-24 2020-01-27 2020-01-28 2020-01-27 2020-07-26 REGIDESO Development Selection ID54 / Recrutement d'un consultant individuel pour Component C: Power Sector Individual diagnostiquer les capacités du IDA / H9350 Reform and Institutional Post Consultant Open 60,000.00 0.00 Canceled 2020-02-17 2020-02-26 2020-03-22 2020-05-19 2020-04-06 2020-04-20 2020-10-17 régulateur des secteurs de Development Selection l'eau potable et de l'énergie au Burundi Component B: Technical IC22 / Actualisation des PARs IDA / H9350 Assistance for Physical Post Direct Selection Direct 400,000.00 520,368.32 Signed 2020-02-10 2020-07-01 2020-02-20 2020-06-19 2020-03-10 2020-10-30 2020-09-06 et PGES lignes pour le PHJIMU Infrastructure ID2A / Panel pour la sécurité Component B: Technical des barrages (Barragiste- IDA / H9350 Assistance for Physical Post Direct Selection Direct 83,283.00 89,655.85 Signed 2014-10-15 2014-10-20 2014-10-24 2014-09-03 2015-04-23 2015-04-23 2020-12-31 Géotechnicien) Infrastructure Component B: Technical ID2B / Panel pour la sécurité IDA / H9350 Assistance for Physical Post Direct Selection Direct 80,371.00 259,341.88 Signed 2014-10-15 2014-10-20 2014-10-25 2014-09-03 2014-11-19 2015-04-30 2020-10-20 des barrages (Géologue Infrastructure ID2D / Panel pour la sécurité Component B: Technical des barrages (Expert en IDA / H9350 Assistance for Physical Post Direct Selection Direct 84,885.00 88,810.72 Signed 2017-03-03 2017-03-03 2017-03-27 2017-03-30 2017-05-02 2017-05-02 2021-05-02 équipements Hydroélectricité) Infrastructure ID14A / Appui à la Préparation du plan Component C: Power Sector Individual d'Affaires de la REGIDESO IDA / H9350 Reform and Institutional Post Consultant Open 126,145.00 0.00 Canceled 2014-10-02 2015-05-18 2015-05-21 2015-07-08 2021-05-12 (Spécialiste en gestion de Development Selection sociétés publiques d'électricité et d'eau) ID17 / Etude d'optimisation Component C: Power Sector Individual offre/demande d'électricité IDA / H9350 Reform and Institutional Post Consultant Open 43,220.00 43,220.00 Signed 2014-10-25 2014-12-04 2017-02-25 2017-02-27 2017-08-31 2017-08-31 2017-10-18 2017-10-18 2020-09-15 de la REGIDESO Development Selection Component B: Technical Individual ID19 / Appui à la gestion IDA / H9350 Assistance for Physical Post Consultant Open 163,200.00 163,200.00 Signed 2014-09-01 2014-09-02 2018-05-02 2018-05-02 2018-05-16 2018-05-16 2018-05-23 2018-05-23 2022-06-01 financière de l'UEP Infrastructure Selection ID18A / Appui à l'évaluation des offres de préqualification Component B: Technical des entreprises pour les IDA / H9350 Assistance for Physical Post Direct Selection Direct 89,450.00 55,740.18 Signed 2014-10-07 2014-10-13 2014-10-20 2014-10-20 2014-11-19 2014-11-19 2020-10-20 travaux d'aménagements de Infrastructure Jiji et Mulembwe ainsi que les postes et lignes associés ID55(A) / Panel assistance Component C: Power Sector Individual technique de la REGIDESO IDA / H9350 Reform and Institutional Post Consultant Limited 120,000.00 112,948.99 Signed 2020-09-30 2020-11-11 2020-10-05 2021-01-13 2020-10-19 2021-03-05 2020-10-31 2021-03-11 2022-11-20 (Lead Informatique) Development Selection ID55(B) / Panel assistance Component C: Power Sector Individual Under technique de la REGIDESO IDA / H9350 Reform and Institutional Post Consultant Limited 120,000.00 0.00 2020-09-30 2020-12-03 2020-10-05 2021-05-17 2020-10-19 2020-10-31 2022-11-20 Implementation (Lead service d’appui) Development Selection ID55(C) / Panel assistance Component C: Power Sector technique de la REGIDESO IDA / H9350 Reform and Institutional Post Direct Selection Direct 120,000.00 121,020.00 Signed 2020-09-30 2020-12-03 2020-10-10 2020-12-17 2020-11-05 2021-04-08 2022-11-25 (Lead technique Electricité) Development ID55(D) / Panel assistance Component C: Power Sector technique de la REGIDESO IDA / H9350 Reform and Institutional Post Direct Selection Direct 120,000.00 126,344.68 Signed 2020-09-30 2020-10-26 2020-10-10 2020-11-09 2020-11-05 2021-01-07 2022-11-25 (Lead Commercial Development Component C: Power Sector Individual ID56 / Appui en Contrôle de IDA / H9350 Reform and Institutional Post Consultant Open 100,000.00 62,400.00 Signed 2020-09-30 2020-10-18 2020-11-10 2020-11-13 2020-11-20 2020-11-23 2020-11-30 2020-11-26 2022-12-20 Gestion de la REGIDESO Development Selection ID57 / Appui en Component C: Power Sector Individual Communication de la IDA / H9350 Reform and Institutional Post Consultant Open 100,000.00 74,160.00 Signed 2020-10-02 2020-10-18 2020-11-10 2020-11-09 2020-11-20 2020-11-17 2020-11-30 2020-11-20 2022-12-20 REGIDESO Development Selection ID2 (E) / Recrutement d'un Component B: Technical Individual Hydrologue membre du Panel IDA / H9350 Assistance for Physical Post Consultant Limited 100,000.00 85,776.44 Signed 2021-02-22 2021-03-26 2021-03-01 2021-04-30 2021-03-15 2021-06-01 2021-03-29 2021-06-09 2022-03-29 pour la sécurité des barrages Infrastructure Selection ID58 / Audit de la mise en Component B: Technical Individual oeuvre du PAR du Projet Under IDA / H9350 Assistance for Physical Post Consultant Limited 50,000.00 0.00 2021-03-16 2021-03-27 2021-03-21 2021-04-30 2021-04-04 2021-04-18 2021-05-06 Hydroélectrique de Jiji et Implementation Infrastructure Selection Mulembwe ID59 / Recrutement d'un Component B: Technical Individual consultant spécialiste en Under IDA / H9350 Assistance for Physical Post Consultant Open 100,000.00 0.00 2021-05-10 2021-06-12 2021-06-26 2021-07-08 2022-07-08 Violence Basé sur le Genre Implementation Infrastructure Selection (VBG) Component B: Technical Individual ID60 / Recrutement d'un IDA / H9350 Assistance for Physical Post Consultant Open 100,000.00 0.00 Under Review 2021-05-10 2021-06-12 2021-06-13 2021-07-09 2022-07-09 Auditeur Interne Infrastructure Selection Component B: Technical Individual ID61 / Recrutement d'un Under IDA / H9350 Assistance for Physical Prior Consultant Open 1,000,000.00 0.00 2021-05-31 2021-07-03 2021-07-24 2021-08-07 2022-10-13 Chef de Projet au sein de l'UEP Implementation Infrastructure Selection Page 4 PLAN DE PASSATION DE MARCHÉS (Texte) Information sur le Projet : République de Djibouti Projet d’Appui à la Modernisation de l’Administration Publique (PAMAP) Numéro de projet : P162904 Agence d’exécution du Projet : Agence Nationale de Système d’Information de l’État (ANSIE) Date du plan de passation des marchés : 18/02/18 Période couverte par ce plan de passation des marchés : Février 2018 à Décembre 2022. Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marché se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées Loi N° 53/AN/09/6ème L Portant nouveau Code des Marchés Publics, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : [ne s’applique pas] Travaux [ne s’applique pas] PROCUREMENT Djibouti : Public Administration Modernization Project PLAN General Information Country: Djibouti Bank’s Approval Date of the Original Procurement Plan: 2018-03-06 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162904 GPN Date: Project Name: Public Administration Modernization Project Loan / Credit No: IDA / V1460, / , IDA / 62270 Agence Nationale des Systèmes d'information de l'Etat Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DJ-ANSIE-86618-CW-RFB / Strengthening e-government Petits travaux de rénovation Single Stage - Two 2020-05- IDA / 62270 foundation and institutional Post Request for Bids Open - National 50,000.00 0.00 Canceled 2019-06-02 2019-06-07 2019-07-19 2019-11-05 du site du CSC (Centre Service Envelope 03 building aux Citoyens) DJ-ANSIE-103550-CW-DIR / Strengthening e-government Travaux de câblage 2019-10- IDA / 62270 foundation and institutional Post Direct Selection Direct 73,000.00 72,311.49 Completed 2019-03-05 2019-03-06 2019-03-10 2019-04-14 2019-04-04 informatique du Palais de la 11 building JUSTICE DJ-ANSIE-86618-CW-RFB-2 Strengthening e-government Single Stage - One 2020-08- / Petits travaux de rénovation IDA / 62270 foundation and institutional Post Request for Bids Open - National 80,000.00 0.00 Canceled 2019-10-31 2019-11-05 2019-12-17 2020-01-16 2020-02-20 Envelope 18 du site du CSC building GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-ANSIE-47458-GO-RFQ / Request for Single Stage - One Achat d'ordinateurs pour le IDA / V1460 Project Management Post Limited 30,000.00 31,541.75 Signed 2018-02-25 2018-03-06 2018-03-21 2018-04-19 2018-09-17 Quotations Envelope projet DJ-ANSIE-47462-GO-RFQ / Request for Single Stage - One Achat de mobilier de bureau / Project Management Post Limited 10,000.00 0.00 Canceled 2018-02-25 2018-03-25 2018-09-21 Quotations Envelope pour le projet DJ-ANSIE-69004-GO-DIR / Strengthening e-government Acquisition d'une IDA / 62270 foundation and institutional Prior Direct Selection Direct 1,000,000.00 1,100,000.00 Signed 2018-08-30 2019-03-02 2018-09-04 2019-03-18 2018-10-09 2019-06-03 2019-04-07 infrastructure PKI (coopération building internationale avec la KICA) DJ-ANSIE-47462-GO-RFQ-2 Request for Single Stage - One / Achat des mobiliers de IDA / 62270 Project Management Post Limited 25,000.00 19,651.74 Completed 2019-01-07 2019-01-23 2019-02-04 2019-02-26 2019-08-03 2020-03-10 Quotations Envelope bureaux DJ-ANSIE-69003-GO-RFQ / Request for Single Stage - One Acquisition d'un Véhicule pour IDA / V1460 Project Management Post Limited 45,000.00 0.00 Canceled 2018-07-29 2018-09-23 2019-03-22 Quotations Envelope le projet DJ-ANSIE-86606-GO-RFB / Single Stage - One Acquisition des véhicules pour IDA / 62270 Project Management Post Request for Bids Open - National 140,000.00 123,578.18 Completed 2018-11-14 2018-11-25 2018-11-19 2019-01-10 2018-12-19 2019-01-30 2018-12-26 2019-02-06 2019-01-26 2019-02-17 2019-07-25 2019-05-05 Envelope le compte du projet DJ-ANSIE-86620-GO-RFB / Strengthening e-government Acquisition, intégration et Single Stage - One IDA / 62270 foundation and institutional Post Request for Bids Open - International 800,000.00 0.00 Canceled 2019-06-19 2019-06-24 2019-08-05 2019-09-04 2019-10-09 2020-04-06 déploiement de la plateforme Envelope building d'interopérabilité DJ-ANSIE-103042-GO-RFQ / Under Acquisition des matériels Request for Single Stage - One IDA / 62270 Project Management Post Limited 25,000.00 0.00 Implementati 2019-03-08 2019-05-01 2019-05-03 2019-10-30 informatiques (ordinateurs et Quotations Envelope on autres) pour l'ANSIE et l'UEP DJ-ANSIE-103552-GO-RFB / Strengthening e-government Single Stage - One Acquisition d'équipements IDA / 62270 foundation and institutional Post Request for Bids Open - International 130,000.00 0.00 Canceled 2019-03-06 2019-09-30 2019-03-11 2019-04-22 2019-11-06 2019-05-22 2019-11-20 2019-06-26 2019-12-23 Envelope réseau building DJ-ANSIE-107695-GO-RFB / Acquisition des équipements Tax and Customs Single Stage - One IDA / 62270 Post Request for Bids Open - International 150,000.00 235,889.34 Signed 2019-03-31 2019-09-30 2019-04-05 2019-05-17 2019-11-06 2019-06-16 2019-11-13 2019-07-21 2020-01-23 2020-01-17 réseaux pour la DGDDI Modernization Envelope (Sydonia phase 2) DJ-ANSIE-118328-GO-RFB / Strengthening e-government Renforcement des Single Stage - One IDA / 62270 foundation and institutional Post Request for Bids Open - International 500,000.00 562,446.58 Signed 2019-06-23 2020-04-01 2019-06-28 2020-04-21 2019-08-09 2020-06-24 2019-09-08 2020-07-08 2019-10-13 2020-08-24 2020-04-10 infrastructures du Envelope building DATACENTER de l'ANSIE DJ-ANSIE-123840-GO-RFQ / Strengthening e-government Request for Single Stage - One Achat des mobiliers de bureau IDA / 62270 foundation and institutional Post Open - National 45,000.00 25,058.00 Completed 2019-07-29 2019-09-23 2020-01-12 2020-03-21 2020-03-08 Quotations Envelope pour la DELIVERY UNIT building DJ-ANSIE-123841-GO-RFQ / Strengthening e-government Acquisition des matériels Request for Single Stage - One IDA / 62270 foundation and institutional Post Open - National 25,000.00 25,909.29 Completed 2019-08-12 2019-10-07 2019-09-10 2020-04-04 2019-09-23 informatiques pour la Quotations Envelope building DELIVERY UNIT DJ-ANSIE-123844-GO-RFB / Under Tax and Customs Single Stage - One Acquisition d'un Système de IDA / 62270 Prior Request for Bids Open - International 3,000,000.00 0.00 Implementati 2019-07-31 2020-03-11 2019-08-05 2020-03-16 2019-09-16 2020-06-24 2019-10-16 2020-11-09 2019-11-20 2020-05-18 Modernization Envelope Gestion des Impôts on DJ-ANSIE-86619-GO-RFB / Acquisition d'un nouveau Tax and Customs Single Stage - Two IDA / 62270 Prior Request for Bids Open - International 3,000,000.00 0.00 Canceled 2019-06-23 2019-09-08 2019-09-08 2019-06-28 2019-11-17 2020-01-30 2020-03-05 2021-08-27 Système d'Information pour la Modernization Envelope gestion des Impôts Page 1 DJ-ANSIE-47468-NC-RFB / Strengthening e-government Under Acquisition du CERT (Centre Single Stage - One IDA / 62270 foundation and institutional Post Request for Bids Open - International 600,000.00 0.00 Implementati 2020-02-28 2021-04-14 2020-03-01 2021-04-18 2020-04-12 2020-05-12 2020-06-16 2020-12-13 gouvernemental de veille et Envelope building on d'alerte) DJ-ANSIE-86616-GO-RFQ / Acquisition des fournitures Strengthening e-government Pending Request for Single Stage - One bureautiques et mobiliers IDA / 62270 foundation and institutional Post Limited 30,000.00 0.00 Implementati 2020-01-20 2020-03-01 2020-08-28 Quotations Envelope pour le Centre de Services au building on Citoyens (CSC) DJ-ANSIE-164659-GO-RFB / Strengthening e-government Pending Acquisition d'Equipements Single Stage - One IDA / 62270 foundation and institutional Post Request for Bids Open - National 130,000.00 0.00 Implementati 2020-04-05 2020-04-10 2020-05-22 2020-06-21 2020-07-26 2021-01-22 Réseaux pour le Palais de Envelope building on Justice DJ-ANSIE-181824-GO-DIR / Under Achats du logiciel DELTA pour IDA / 62270 Project Management Post Direct Selection Direct 23,000.00 0.00 Implementati 2020-07-01 2020-08-16 2020-07-06 2020-09-16 2020-08-10 2021-08-05 le suivi-évaluation du PAMAP on DJ-ANSIE-194627-GO-RFQ / Acquisition d'équipement Strengthening e-government Under Request for Single Stage - One informatique pour le IDA / 62270 foundation and institutional Post Limited 50,000.00 0.00 Implementati 2020-10-02 2020-11-27 2021-05-26 Quotations Envelope déploiement de la plateforme building on d’interopérabilité DJ-ANSIE-232676-GO-RFQ / Strengthening e-government Pending Single Stage - One Acquisition des matériels de IDA / 62270 foundation and institutional Post Request for Bids Open - National 60,000.00 0.00 Implementati 2021-05-25 2021-05-30 2021-07-11 2021-08-10 2021-09-14 2022-01-17 Envelope vidéo-conférence building on DJ-ANSIE-237787-GO-RFQ / Pending Acquisition des matériels Request for Single Stage - One IDA / 62270 Project Management Post Limited 20,000.00 0.00 Implementati 2021-06-11 2021-07-26 2021-08-25 bureautiques pour le compte Quotations Envelope on du PAMAP NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-ANSIE-46698-NC-DIR / Location d'un site pour le Strengthening e-government back up de l'ANSIE comme IDA / V1460 foundation and institutional Prior Direct Selection Direct 62,500.00 62,500.00 Signed 2018-05-07 2018-05-12 2018-06-16 2018-06-14 2018-12-13 recommandé dans la mission building d'évaluation du projet. DJ-ANSIE-164236-NC-RFB / Sensibilisation et Strengthening e-government Pending Single Stage - One communication sur la IDA / 62270 foundation and institutional Post Request for Bids Open - National 200,000.00 0.00 Implementati 2020-06-10 2020-06-15 2020-07-27 2020-08-26 2020-09-30 2021-03-29 Envelope transformation numérique building on (cabinet de communication) DJ-ANSIE-211828-NC-RFQ / Strengthening e-government Under Developpement d'une IDA / 62270 foundation and institutional Post Direct Selection Direct 141,294.00 0.00 Implementati 2020-05-17 2021-05-17 2020-05-22 2021-05-17 2020-06-26 2020-12-23 application E-COVID building on DJ-ANSIE-232071-NC-DIR / Pending Contrat de maintenance du IDA / 62270 Project Management Post Direct Selection Direct 3,226.00 0.00 Implementati 2021-05-09 2021-05-14 2021-06-18 2023-05-31 logiciel de gestion financière on SUCESS CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-ANSIE-49833-CS-QCBS / AMOA pour la mise en place Tax and Customs Quality And Cost- IDA / V1460 Prior Open - International 250,000.00 199,876.00 Signed 2018-03-05 2018-05-03 2018-03-26 2018-08-06 2018-05-09 2018-08-27 2018-06-06 2018-10-03 2018-07-06 2018-10-14 2018-08-10 2018-11-27 2018-09-14 2018-12-26 2019-09-14 d'un système d'information Modernization Based Selection pour la DGI DJ-ANSIE-50008-CS-CQS / Strengthening e-government Consultant Recrutement d'un consultant / foundation and institutional Post Qualification Open - International 20,000.00 0.00 Canceled 2018-03-01 2018-03-22 2018-05-05 2018-06-04 2018-07-09 2019-01-05 pour l'encadrement du pole building Selection dev DJ-ANSIE-47482-CS-LCS / Recrutement d'un auditeur Least Cost IDA / 62270 Project Management Post Open - International 40,000.00 0.00 Canceled 2018-09-19 2018-10-10 2018-11-23 2018-12-21 2019-01-20 2019-02-24 2019-03-31 2019-09-27 externe pour les 4 premiers Selection exercies DJ-ANSIE-79662-CS-LCS / Recrutement d'un cabinet Least Cost d'audit National pour le IDA / 62270 Project Management Post Open - National 30,000.00 11,100.00 Signed 2018-09-26 2018-09-26 2018-10-10 2018-10-16 2018-10-24 2018-11-04 2018-11-07 2018-12-06 2018-11-14 2018-12-19 2018-11-28 2019-01-09 2018-12-20 2019-02-12 2019-06-18 Selection compte du projet ( sur 3 exercices) DJ-ANSIE-47469-CS-CQS / Recrutement d'un consultant Strengthening e-government Consultant pour le développement d'une IDA / V1460 foundation and institutional Prior Qualification Open - International 80,000.00 0.00 Canceled 2018-03-15 2018-03-29 2018-04-15 2018-04-15 2018-05-06 2018-11-02 stratégie nationale de cyber building Selection sécurité  DJ-ANSIE-78352-CS-QCBS / Strengthening e-government Quality And Cost- Assistance technique pour la IDA / 62270 foundation and institutional Post Open - International 350,000.00 0.00 Canceled 2019-02-28 2019-02-28 2019-03-21 2019-03-26 2019-05-04 2019-06-01 2019-07-01 2019-08-05 2019-09-09 2020-09-08 Based Selection mise en place du NIU building DJ-ANSIE-69002-CS-QCBS / Recrutement d'un cabinet de Strengthening e-government conseil pour la mise en place Quality And Cost- IDA / V1460 foundation and institutional Prior Open - National 400,000.00 0.00 Canceled 2018-07-17 2018-12-04 2018-08-07 2018-09-20 2018-10-18 2018-11-17 2018-12-22 2019-01-26 2020-01-26 du cadre légal et Based Selection building réglementaire des activités du PAMAP. Page 2 DJ-ANSIE-103041-CS-QCBS / Recrutement d'un Cabinet Strengthening e-government juridique international pour la Quality And Cost- IDA / 62270 foundation and institutional Post Open - International 250,000.00 112,400.00 Completed 2019-02-28 2019-02-28 2019-03-21 2019-03-04 2019-05-04 2019-04-15 2019-06-01 2019-05-16 2019-07-01 2019-05-29 2019-08-05 2019-06-13 2019-09-09 2019-07-10 2020-09-08 2020-02-09 l'élaboration du cadre légal Based Selection building pour les transactions électroniques DJ-ANSIE-103039-CS-QCBS / Recrutement d'un cabinet Strengthening e-government des consultants pour la mise Quality And Cost- Under IDA / 62270 foundation and institutional Post Open - International 400,000.00 0.00 2019-02-28 2019-06-12 2019-03-21 2019-05-04 2020-01-29 2019-06-01 2019-07-01 2019-08-05 2019-09-09 2020-09-08 en place d'un système de Based Selection Implementation building gestion électronique des documents DJ-ANSIE-118345-CS-QCBS / Recrutement d'un cabinet d'études pour le développement d'une plateforme numérique Strengthening e-government Consultant interopérable : étude IDA / 62270 foundation and institutional Prior Qualification Open - International 1,000,000.00 0.00 Canceled 2019-06-10 2019-06-10 2019-07-01 2019-10-09 2019-08-14 2019-12-02 2019-09-13 2019-10-18 2020-04-15 analytique des systèmes building Selection d'information existants dans l'administration publique et déploiement de la solution XROAD. DJ-ANSIE-90094-CS-CQS / Recrutement d'un Cabinet Strengthening e-government Consultant Juridique International pour la IDA / 62270 foundation and institutional Post Qualification Limited 400,000.00 0.00 Canceled 2018-12-09 2018-12-23 2019-01-22 2019-02-26 2019-08-25 mise en place du cadre légal building Selection et réglementaire des activités du projet PAMAP DJ-ANSIE-49829-CS-QCBS / Etude et analyse des SI Strengthening e-government Quality And Cost- existants pour la plateforme IDA / V1460 foundation and institutional Post Open - International 100,000.00 0.00 Canceled 2019-02-12 2019-03-05 2019-03-19 2019-03-22 2019-03-22 2019-04-05 2019-04-26 2020-04-25 Based Selection d'interopérabilité des building systèmes DJ-ANSIE-78353-CS-QCBS / Strengthening e-government AMOA pour la mise en place Quality And Cost- IDA / 62270 foundation and institutional Post Open - International 200,000.00 0.00 Canceled 2019-03-13 2019-04-03 2019-05-17 2019-06-14 2019-07-14 2019-08-18 2019-09-22 2020-09-21 de la plateforme Based Selection building d'intéropérabilité DJ-ANSIE-118349-CS-QCBS / Recrutement d'un Cabinet/Agence de communication pour l'élaboration de documents Strengthening e-government stratégiques de Quality And Cost- IDA / 62270 foundation and institutional Post Open - National 25,000.00 0.00 Canceled 2019-06-10 2019-06-12 2019-07-01 2019-08-14 2019-09-11 2019-10-11 2019-11-15 2019-12-20 2020-12-19 communication « Compagne Based Selection building de sensibilisation » pour le compte de la Commission Nationale Indépendante pour la Prévention et la Lutte contre la Corruption DJ-ANSIE-49820-CS-QCBS / Strengthening e-government Acquisition et formation d'une Quality And Cost- IDA / 62270 foundation and institutional Post Open - International 80,000.00 0.00 Canceled 2019-10-24 2019-11-07 2019-11-14 2019-11-20 2019-11-20 2019-12-04 2019-12-18 2020-12-17 solution GED pour la Cour de Based Selection building Comptes DJ-ANSIE-160190-CS-QCBS / Recrutement d'un cabinet d'études pour le développement d'une plateforme numérique Strengthening e-government Quality And Cost- Under interopérable: étude IDA / 62270 foundation and institutional Prior Open - International 1,000,000.00 0.00 2020-02-23 2020-03-15 2020-04-28 2020-05-26 2020-06-25 2020-07-30 2020-06-30 2020-09-03 2021-09-03 Based Selection Implementation analytique des systèmes building d'information existants dans l'administration publique et déploiement de la solution XROAD. DJ-ANSIE-222144-CS-CQS / Recrutement d'un cabinet de consultant pour l'élaboration d’un programme pluriannuel Strengthening e-government Consultant Pending des audits basés sur les IDA / V1460 foundation and institutional Post Qualification Open - International 80,000.00 0.00 2021-04-29 2021-05-20 2021-07-03 2021-08-02 2021-09-06 2021-11-15 Implementation Risques ainsi que pour la mise building Selection à jour et la rédaction des procédures de gestion pour le compte de la Cour de Compte DJ-ANSIE-160938-CS-CQS / Assistance pour la mise en Strengthening e-government Consultant place d'un Système de IDA / 62270 foundation and institutional Post Qualification Open - International 100,000.00 0.00 Canceled 2020-02-27 2020-03-16 2020-04-06 2020-04-24 2020-05-06 2020-11-02 Management de la Sécurité de building Selection l'Information DJ-ANSIE-232069-CS-CQS / Recrutement d'un cabinet Strengthening e-government Consultant juridique pour la revue des IDA / 62270 foundation and institutional Post Qualification Limited 120,000.00 0.00 Canceled 2021-05-21 2021-06-04 2021-07-04 2021-08-08 2022-02-04 textes légaux constituant le building Selection projet du code du Numérique DJ-ANSIE-232684-CS-CQS / Recrutement d'un cabinet Strengthening e-government Consultant national pour la mise en place IDA / 62270 foundation and institutional Post Qualification Limited 150,000.00 0.00 Canceled 2021-06-01 2021-06-15 2021-07-15 2021-08-19 2022-02-15 d'un système d'information de building Selection la préfecture DJ-ANSIE-232686-CS-CQS / Recrutement d'un cabinet Strengthening e-government Consultant national pour le IDA / 62270 foundation and institutional Post Qualification Limited 80,000.00 0.00 Canceled 2021-06-01 2021-06-15 2021-07-15 2021-08-19 2022-02-15 développement de la building Selection plateforme mobile e-gouv DJ-ANSIE-237758-CS-CQS / Recrutement d'un cabinet Strengthening e-government Consultant Pending national pour la mise en IDA / 62270 foundation and institutional Post Qualification Open - National 150,000.00 0.00 2021-06-07 2021-06-16 2021-07-14 2021-07-29 2021-08-12 2022-02-08 Implementation place d'un système building Selection d'information de la préfecture Page 3 DJ-ANSIE-237766-CS-CQS / Recrutement d'un cabinet Strengthening e-government Consultant Pending national pour le IDA / 62270 foundation and institutional Post Qualification Open - National 80,000.00 0.00 2021-06-06 2021-06-20 2021-07-19 2021-07-20 2021-08-04 2022-01-31 Implementation développement de la building Selection plateforme mobile e-gouv DJ-ANSIE-237770-CS-CQS / Recrutement d'un cabinet Strengthening e-government Consultant Pending juridique pour la revue des IDA / 62270 foundation and institutional Post Qualification Open - National 120,000.00 0.00 2021-06-08 2021-06-15 2021-07-15 2021-07-25 2021-08-18 2022-02-14 Implementation textes légaux constituant le building Selection projet du code du numérique INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-ANSIE-47470-CS-CDS / Recrutement d'un consultant Strengthening e-government pour la mise en place du / foundation and institutional Prior Direct Selection Direct 84,000.00 0.00 Canceled 2018-02-21 2018-03-03 2018-04-09 2018-10-06 cadre règlementaire et légal building de l'identité numérique  DJ-ANSIE-47472-CS-INDV / Recrutement d'un expert technique en Gestion de Individual Projets Informatiques en / Project Management Prior Consultant Open 60,000.00 0.00 Canceled 2018-02-28 2018-04-11 2018-04-11 2018-05-02 2018-10-29 appui à l'ANSIE et pour la Selection préparation du manuel d'opération du projet DJ-ANSIE-47475-CS-INDV / Strengthening e-government Individual Recrutement d'un Ingénieur IDA / V1460 foundation and institutional Post Consultant Open 25,000.00 19,400.00 Signed 2018-02-25 2018-03-16 2018-07-15 2018-03-16 2018-08-15 2018-03-30 2018-09-09 2018-09-26 Analyste Programmeur pour building Selection l'ANSIE DJ-ANSIE-47477-CS-INDV / Strengthening e-government Individual Recrutement d'un Ingénieur / foundation and institutional Post Consultant Open 25,000.00 0.00 Canceled 2018-02-27 2018-03-11 2018-04-17 2018-05-08 2018-06-12 2018-12-09 en Gestion Projet building Selection Informatique pour l'ANSIE DJ-ANSIE-47478-CS-INDV / Strengthening e-government Individual Recrutement d'un technicien IDA / V1460 foundation and institutional Post Consultant Open 15,000.00 1,011.09 Signed 2018-02-27 2018-04-17 2018-07-15 2018-05-08 2018-08-29 2018-06-12 2018-09-09 2018-12-09 en développement building Selection DJ-ANSIE-49839-CS-INDV / Strengthening e-government Individual Recrutement d'un technicien IDA / V1460 foundation and institutional Post Consultant Open 15,000.00 1,011.09 Signed 2018-02-27 2018-04-17 2018-07-15 2018-05-08 2018-08-29 2018-06-12 2018-09-09 2018-12-09 en développement building Selection DJ-ANSIE-49998-CS-INDV / Strengthening e-government Individual Recrutement d'un technicien / foundation and institutional Post Consultant Open 15,000.00 0.00 Canceled 2018-04-01 2018-05-20 2018-06-10 2018-07-15 2019-01-11 pour l'exploitation de building Selection l'infrastructure PKI DJ-ANSIE-49999-CS-INDV / Strengthening e-government Individual Recrutement d'un technicien / foundation and institutional Post Consultant Open 15,000.00 0.00 Canceled 2018-04-01 2018-05-20 2018-06-10 2018-07-15 2019-01-11 pour l'exploitation de building Selection l'infrastructure PKI DJ-ANSIE-50003-CS-INDV / Individual Recrutement Chauffeur sur / Project Management Post Consultant Open 6,000.00 0.00 Canceled 2018-03-01 2018-04-19 2018-05-10 2018-06-14 2018-12-11 une année Selection DJ-ANSIE-50027-CS-LCS / Acquisition et formation d'un IDA / V1460 Project Management Post Direct Selection Direct 30,000.00 33,188.13 Signed 2018-03-07 2018-03-11 2018-03-17 2018-03-01 2018-05-21 2018-10-28 2018-11-17 logiciel de gestion financière DJ-ANSIE-69010-CS-CDS / Tax and Customs IDA / 62270 Prior Direct Selection Direct 900,000.00 734,500.00 Signed 2018-07-11 2018-07-17 2018-07-21 2018-09-24 2018-12-18 2019-03-23 Evolution Sydonia phase 2 Modernization DJ-ANSIE-69936-CS-INDV / Strengthening e-government Individual Recrutement d'un technicien IDA / V1460 foundation and institutional Post Consultant Limited 15,000.00 1,011.09 Signed 2018-07-17 2018-07-19 2018-07-22 2018-09-11 2018-08-12 2018-09-20 2018-09-16 2018-10-15 2019-03-15 pour le PKI building Selection DJ-ANSIE-69938-CS-INDV / Strengthening e-government Individual Recrutement d'un technicien IDA / V1460 foundation and institutional Post Consultant Limited 15,000.00 1,011.09 Signed 2018-07-17 2018-07-19 2018-07-22 2018-09-11 2018-08-12 2018-09-20 2018-09-16 2018-10-03 2019-03-15 pour le PKI building Selection DJ-ANSIE-50001-CS-INDV / Individual Mise en place de la IDA / V1460 Project Management Post Consultant Open 40,000.00 39,200.00 Completed 2018-10-01 2018-12-08 2018-10-25 2019-01-17 2018-11-08 2019-01-29 2018-11-28 2019-02-17 2018-12-28 2019-09-09 communication du projet Selection DJ-ANSIE-50005-CS-INDV / Individual Recrutement Assistant IDA / 62270 Project Management Post Consultant Open 60,000.00 0.00 Canceled 2018-10-01 2018-10-21 2018-10-31 2018-11-20 2019-11-20 Administratif et Logistique Selection DJ-ANSIE-73465-CS-INDV / Individual Recrutement d'un Assistant en IDA / 62270 Project Management Post Consultant Limited 60,000.00 730.23 Signed 2018-09-24 2018-10-01 2018-09-29 2018-11-18 2018-10-20 2018-11-19 2018-11-24 2018-12-02 2019-05-23 Passation des Marchés Selection DJ-ANSIE-73480-CS-INDV / Individual Recrutement d'un Consultant IDA / V1460 Project Management Post Consultant Limited 28,000.00 2,196.32 Signed 2018-09-17 2018-10-01 2018-09-22 2018-10-13 2018-11-21 2018-11-17 2018-11-21 2019-05-16 Chargé des Opérations Selection DJ-ANSIE-73499-CS-INDV / Strengthening e-government Individual Recrutement d'un consultant IDA / V1460 foundation and institutional Post Consultant Limited 100,000.00 0.00 Canceled 2018-08-16 2018-12-09 2018-08-21 2018-09-11 2018-10-16 2019-04-14 juridique building Selection DJ-ANSIE-50003-CS-INDV-2 Individual / Recrutement d'un Chauffeur IDA / 62270 Project Management Post Consultant Limited 40,000.00 581.38 Signed 2018-09-24 2018-09-30 2018-09-29 2018-10-20 2018-10-14 2018-11-24 2018-10-14 2019-05-23 pour l'UEP Selection DJ-ANSIE-79668-CS-INDV / Individual Recrutement d'un IDA / V1460 Project Management Post Consultant Direct 28,000.00 27,600.00 Signed 2018-09-27 2018-09-30 2018-10-07 2018-10-14 2018-10-14 2018-10-17 2018-10-16 2018-10-17 2019-04-14 Responsable Administratif et Selection Financier pour le projet Page 4 DJ-ANSIE-47481-CS-INDV / Recrutement d'un consultant Individual pour le manuel des IDA / V1460 Project Management Post Consultant Open 25,000.00 0.00 Canceled 2018-02-20 2018-04-10 2018-05-01 2018-06-05 2018-12-02 procédures de passation de Selection marchés et de Gestion financière du projet DJ-ANSIE-47464-CS-QBS / Strengthening e-government Individual Recrutement d'un consultant IDA / V1460 foundation and institutional Post Consultant Open 80,000.00 0.00 Canceled 2018-07-26 2018-09-13 2018-10-04 2018-11-08 2019-05-07 pour développer la stratégie building Selection et la feuille de route de l'ANSIE DJ-ANSIE-47464-CS-QBS-2 / Strengthening e-government Individual Recrutement d'un consultant IDA / V1460 foundation and institutional Post Consultant Limited 80,000.00 31,119.00 Completed 2018-11-18 2018-12-08 2018-11-23 2019-02-07 2018-12-14 2019-02-21 2019-01-18 2019-03-17 2019-07-17 2020-03-08 pour développer la stratégie building Selection et la feuille de route de l'ANSIE DJ-ANSIE-90076-CS-INDV / Recrutement d'un consultant Strengthening e-government Individual pour le développement d'une IDA / 62270 foundation and institutional Post Consultant Limited 80,000.00 99,550.00 Completed 2018-12-12 2018-12-09 2018-12-17 2019-02-07 2019-01-07 2019-02-21 2019-02-11 2019-04-18 2019-08-10 2019-11-09 stratégie nationale de cyber building Selection sécurité  DJ-ANSIE-47479-CS-INDV / Individual Recrutement d'un consultant IDA / V1460 Project Management Prior Consultant Open 40,000.00 0.00 Canceled 2018-02-27 2018-04-17 2018-07-17 2018-05-08 2018-06-12 2018-12-09 en gestion financière (appui Selection ponctuel) DJ-ANSIE-103032-CS-INDV / Recrutement d'un Consultant juridique international pour la Strengthening e-government Individual l'élaboration du cadre légal IDA / 62270 foundation and institutional Post Consultant Open 150,000.00 84,398.50 Terminated 2019-02-28 2019-02-28 2019-04-18 2019-04-14 2019-05-09 2019-05-26 2019-06-13 2019-07-21 2019-12-10 pour la protection des building Selection données à caractères personnelles et l'accès à l'information DJ-ANSIE-103038-CS-CDS / ASSISTANCE TECHNIQUE POUR L'AMÉLIORATION DU CODE Tax and Customs GENERAL DES IMPÔTS ET LA IDA / 62270 Post Direct Selection Direct 40,000.00 0.00 Canceled 2019-02-28 2019-03-10 2019-05-14 2019-11-10 Modernization MISE EN ŒUVRE DES RÉFORMES ADMINISTRATIVES ET FISCALES DJ-ANSIE-103527-CS-INDV / Recrutement d'un expert en Strengthening e-government Individual finance publique pour le IDA / 62270 foundation and institutional Post Consultant Open 30,000.00 36,225.00 Completed 2019-03-03 2019-03-06 2019-04-21 2019-05-09 2019-05-12 2019-06-25 2019-06-16 2019-07-07 2019-12-13 2019-11-13 compte de la Cour des building Selection Comptes DJ-ANSIE-118321-CS-CDS / Recrutement du cabinet Strengthening e-government PEMANDU ASSOCIATES pour la IDA / 62270 foundation and institutional Prior Direct Selection Direct 300,000.00 750,000.00 Completed 2019-06-09 2019-06-16 2019-06-19 2019-07-25 2019-08-23 2019-08-01 2020-02-19 2019-10-30 mise en place d'une "DELIVERY building UNIT" au sein du gouvernement DJ-ANSIE-50005-CS-INDV-2 Individual / Recrutement d'un Assistant IDA / 62270 Project Management Post Consultant Limited 48,000.00 0.00 Canceled 2018-10-08 2018-11-19 2018-10-13 2018-11-03 2018-12-08 2019-06-06 Administratif et Logistique Selection DJ-ANSIE-73499-CS-INDV-2 / Recrutement d'un consultant juridique pour accompagner Strengthening e-government Individual l'ANSIE dans la mise en place IDA / 62270 foundation and institutional Post Consultant Open 100,000.00 0.00 Canceled 2019-03-31 2019-03-28 2019-05-19 2019-06-09 2019-07-14 2020-01-10 du cadre légal et building Selection réglementaire des activités du projet PAMAP DJ-ANSIE-139251-CS-CQS / Recrutement d'un consultant(e) pour l'élaboration de documents stratégiques de Strengthening e-government Individual communication « Compagne IDA / 62270 foundation and institutional Post Consultant Limited 25,000.00 13,500.00 Completed 2019-10-17 2019-11-28 2019-10-22 2019-11-06 2019-10-29 2019-11-17 2019-11-14 2019-12-02 2020-05-12 2020-03-16 de sensibilisation » pour le building Selection compte de la Commission Nationale Indépendante pour la Prévention et la Lutte contre la Corruption. DJ-ANSIE-123834-CS-INDV / Strengthening e-government Individual Mise en place du Manuel des IDA / 62270 foundation and institutional Post Consultant Open 40,000.00 39,500.00 Signed 2019-10-20 2019-11-07 2019-11-22 2020-02-13 2019-11-29 2020-03-01 2020-01-03 2020-03-29 2020-03-02 Procédures du CSC building Selection DJ-ANSIE-140347-CS-INDV / Recrutement d'un consultant Strengthening e-government Individual national pour l'élaboration des IDA / 62270 foundation and institutional Post Consultant Limited 10,000.00 9,834.60 Completed 2019-10-20 2019-11-07 2019-10-23 2019-11-19 2019-10-30 2020-01-13 2019-11-14 2020-01-13 2020-05-12 2020-03-08 specifications techniques pour building Selection les travaux de rénovation du CSC DJ-ANSIE-140951-CS-INDV / Recrutement d'un consultant international en appui au Strengthening e-government Individual colloque relatif à la IDA / 62270 foundation and institutional Post Consultant Limited 20,000.00 14,000.00 Completed 2019-11-05 2019-12-05 2019-11-07 2019-12-09 2019-11-14 2020-02-04 2019-11-29 2020-02-16 2020-05-27 2020-06-25 vulgarisation des rôles et building Selection responsabilités des ordonnateurs et des comptables publics DJ-ANSIE-140955-CS-INDV / Recrutement d'un consultant national en appui au colloque Strengthening e-government Individual relatif à la vulgarisation des IDA / 62270 foundation and institutional Post Consultant Limited 10,000.00 6,900.00 Completed 2019-11-05 2019-12-08 2019-11-08 2019-12-08 2019-11-15 2020-01-08 2019-11-30 2020-02-16 2020-05-28 2020-06-23 rôles et responsabilités des building Selection ordonnateurs et des comptables publics Page 5 DJ-ANSIE-140964-CS-INDV / Recrutement d'un consultant pour l'élaboration des Strengthening e-government Individual spécifications techniques du IDA / 62270 foundation and institutional Post Consultant Open 80,000.00 107,100.00 Signed 2019-10-31 2019-11-28 2019-11-29 2020-02-13 2019-12-12 2020-03-02 2019-12-30 2020-07-08 2020-06-27 Centre de Réponses aux building Selection Incidents Informatiques (CERT) DJ-ANSIE-118339-CS-INDV / Recrutement d'un CHEF DE Strengthening e-government Individual PROJET SYSTEME IDA / 62270 foundation and institutional Post Consultant Limited 25,000.00 0.00 Canceled 2019-06-10 2019-06-10 2019-06-15 2019-07-06 2019-08-10 2020-02-06 D'INFORMATION pour l'ANSIE building Selection (ref DJ-ANSIE-47477-CS- INDV ) DJ-ANSIE-164657-CS-CQS / Strengthening e-government Individual Under Recrutement d'un chef de IDA / 62270 foundation and institutional Post Consultant Open 50,000.00 0.00 2020-03-18 2020-02-04 2020-05-06 2020-05-27 2020-07-01 2020-12-28 Implementation projet building Selection DJ-ANSIE-164238-CS-CQS / Strengthening e-government Individual Recrutement d'un consultant Under IDA / 62270 foundation and institutional Post Consultant Limited 50,000.00 0.00 2020-03-23 2020-09-16 2020-03-28 2020-10-08 2020-04-18 2020-05-23 2020-11-19 chargé de communication à Implementation building Selection l'ANSIE DJ-ANSIE-139248-CS-PRA / Individual recrutement d'un(e) IDA / 62270 Project Management Post Consultant Open 25,000.00 0.00 Canceled 2019-10-09 2019-10-17 2019-11-04 2019-11-04 2019-11-09 2019-12-25 2019-11-17 2020-05-15 responsable de passation de Selection marchés DJ-ANSIE-171871-CS-INDV / Individual Recrutement d'un responsable IDA / 62270 Project Management Post Consultant Direct 25,000.00 1,986.58 Signed 2020-05-03 2020-05-10 2020-05-13 2020-05-10 2020-06-03 2020-05-10 2020-07-08 2020-05-10 2022-12-31 en passation de marchés Selection publics DJ-ANSIE-171995-CS-CDS / Recrutement d'un cabinet International Juridique pour la Strengthening e-government protection des données et la IDA / 62270 foundation and institutional Post Direct Selection Direct 350,000.00 349,309.50 Signed 2020-05-14 2020-07-08 2020-05-24 2020-06-24 2020-07-28 2020-08-16 2021-01-24 finalisation du cadre légal building relatif à la transformation numérique DJ-ANSIE-194620-CS-INDV / Recrutement d'un consultant pour l'assistance technique à Strengthening e-government Individual la Cour de Comptes et IDA / 62270 foundation and institutional Post Consultant Limited 40,000.00 0.00 Canceled 2020-09-24 2020-10-21 2020-09-29 2020-10-20 2020-11-08 2021-03-08 discipline pour la mise en building Selection oeuvre du PS 2019 et du plan opérationnel 2021 DJ-ANSIE-194612-CS-INDV / Recrutement d'un consultant Strengthening e-government Individual pour la mise en oeuvre de la IDA / 62270 foundation and institutional Post Consultant Direct 13,500.00 0.00 Canceled 2020-09-16 2020-09-26 2020-10-06 2020-10-11 2021-01-09 stratégie de communication building Selection de la CNIPLC DJ-ANSIE-228092-CS-INDV / Assistance pour la mise en Strengthening e-government Individual Pending place d'un Système de IDA / 62270 foundation and institutional Post Consultant Limited 100,000.00 0.00 2021-04-14 2021-04-19 2021-05-10 2021-06-14 2021-12-11 Implementation Management de la Sécurité de building Selection l'Information (SMSI) DJ-ANSIE-232065-CS-INDV / Strengthening e-government Individual Audit d'exploitation du IDA / 62270 foundation and institutional Post Consultant Limited 100,000.00 0.00 Canceled 2021-06-01 2021-06-06 2021-06-27 2021-08-01 2021-10-30 Datacenter building Selection DJ-ANSIE-232068-CS-INDV / Strengthening e-government Individual Pending Recrutement d'un assistant en IDA / 62270 foundation and institutional Post Consultant Limited 28,000.00 0.00 2021-05-17 2021-05-22 2021-06-06 2021-07-11 2022-10-04 Implementation communication building Selection DJ-ANSIE-232688-CS-CDS / Recrutement d'un expert international pour Strengthening e-government Individual Pending l'élaboration de la stratégie de IDA / 62270 foundation and institutional Post Consultant Open 100,000.00 0.00 2021-06-07 2021-06-28 2021-07-13 2021-08-03 2022-01-30 Implementation mise à l'échelle et du building Selection déploiement des services numériques DJ-ANSIE-237781-CS-INDV / Strengthening e-government Individual Pending Audit d'exploitation du IDA / 62270 foundation and institutional Post Consultant Open 100,000.00 0.00 2021-06-08 2021-07-12 2021-07-22 2021-08-10 2022-02-06 Implementation Datacenter building Selection Page 6 Procurement Plan I. General 1. Project Information Country : Bhutan Borrower : Project Name : Food Security and Agriculture Productivity Project Loan Credit No. : P 1555513 2. Bank’s Approval Date of the Procurement Plan : October 20, 2016 In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. II. Goods, Works and Non consulting Services 1. Prior Review Threshold Method of Thresholds for Method Prior Review Procurement (USD equivalent) Threshold (USD) ICB (Goods) > 200,000 USD All contract above USD 100,000 RFB ( Goods) > USD 30,000 and up to USD 200,000 RFQ (Goods) Up to USD 30,000 ICB (Works) > 1.5 million All contract above RFB (Works) > 50,000 and up to USD USD 300,000 1.5 million RFQ (Works) Up to USD 50,000 ICB (Non- > 200,000 USD All contract above Consulting USD 100,000 Services) RFB (Non- < 200,000 USD Consulting Services) Direct Contracting No Threshold; meet paragraph 6.8, 6.9 and 6.10 of regulations Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified depending on the risk assessment and implementation of mitigation measures. In the case of contracts subject to prior review, before granting / agreeing to (a) a material extension of the stipulated time for performance of a contract; or (b) any substantial modification or waiver of the scope of services or other significant changes to the terms and conditions of such that the contract, including issuing; or (c) any change variation order or orders under such contract amendment (except in cases of extreme urgency) which would in aggregate, singly or combined with all variation orders or amendments previously issued, increase the original contract amount of the contract by more than 15% (fifteen percent); or (d) the proposed termination of the original price contract, the Borrower shall seek the Bank’s no objection to the proposed extension, modification, or change order. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable 3. Reference to Project operational/Procurement Manual Standard Bidding Documents agreed between Project and Bank will be used for all works, consultancy and goods procurements. 4. Any Other Special Procurement Arrangements: National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process.. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. II. Domestic Preference. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable The bid evaluation will be carried out as per agreed timeline in the Procurement Activity Schedule III. Selection of Consultant 1. Prior Review Threshold Method of Threshold (USD Prior Review Threshold Procurement Equivalent) (a) Quality and Cost No threshold All Contracts above USD Based Selection 70,000 for Firms; and (b) Quality Based No threshold above USD 50,000 for Selection Individuals (c) Selection Made No threshold Under a Fixed Budget (d) Least Cost Selection No threshold (e) Selection Based on < 100,000 Consultant’s Qualifications (f) Single Source As per Consultant Selection of firms Guidelines Para 3.9 (g) Selection of No threshold Individual Consultants Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 200,000 equivalent per contract, may comprise entirely of national consultants. PROCUREMENT Bhutan : Food Security and Agriculture Productivity Project PLAN General Information Country: Bhutan Bank’s Approval Date of the Original Procurement Plan: 2020-05-28 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155513 GPN Date: 2017-11-30 Project Name: Food Security and Agriculture Productivity Project Loan / Credit No: TF / A4224 A Executing Agency(ies): RDC Bajo WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-ARDC-B-175042-GO-DIR / Procurement of 500 nos of Component 2: Enhancing TF / A4224 Post Direct Selection Direct 100.00 50.80 Completed 2020-06-10 2020-05-29 2020-06-15 2020-06-22 2020-07-20 2020-06-22 2021-01-16 2020-06-23 brisks for construction Farmer Productivity Biodigester at ARDC, Bajo. BT-ARDC-B-175046-GO-DIR / Procurement of aggregates Component 2: Enhancing TF / A4224 Post Direct Selection Direct 180.00 186.61 Completed 2020-06-01 2019-11-25 2020-06-06 2019-11-26 2020-07-11 2019-11-26 2021-01-07 2019-12-14 and boulders for construction Farmer Productivity of Biodigester at ARDC, Bajo BT-ARDC-B-175049-GO-DIR / Procurement of 30 bags- Component 2: Enhancing cement to be used for TF / A4224 Post Direct Selection Direct 180.00 464.46 Completed 2020-06-03 2019-12-12 2020-06-08 2019-12-12 2020-07-13 2019-12-12 2021-01-09 2020-06-16 Farmer Productivity construction of biodigester at ARDC, Bajo BT-ARDC-B-229482-GO- RFQ / Procurement of GI wire, Pending clamps, electrical items and Component 1:Strengthening Request for Single Stage - One TF / A4224 Post Open - National 4,500.00 0.00 Implementati 2021-07-25 2021-09-19 2022-03-18 other materials for Farmer and Producer Groups Quotations Envelope on beekeeping to mitigate human wildlife conflict. BT-ARDC-B-229484-GO- RFQ / Procurement of silpoline sheet 300GSM, Pending sprinklers @ 650, single plug Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 6,000.00 0.00 Implementati 2021-07-25 2021-09-19 2022-03-18 trays for promotion of climate Farmer Productivity Quotations Envelope on smart agriculture technologies to be issued to project dzongkhags. BT-ARDC-B-236841-GO-DIR / Procurement of materials for maintenance of Internal Irrigation channel and onion Pending Component 2: Enhancing drying shed such as sand, TF / A4224 Post Direct Selection Direct 12,500.00 0.00 Implementati 2021-08-06 2021-08-11 2021-09-15 2022-03-14 Farmer Productivity stone gravel, cement, wire on mesh, stone boulders, HDPE Pipes, timbers and other martials BT-ARDC-B-229490-GO- RFQ / Procurement of SMART irrigation controller: Complete Pending set: Smart controller, solar Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 18,500.00 0.00 Implementati 2021-08-16 2021-10-11 2022-04-09 panel, battery, HP pump Wifi Farmer Productivity Quotations Envelope on based temperature and Humidity Sensor and online logging and Watering zone. BT-ARDC-B-236842-GO- RFQ / Procurement of value addition on rice for product Pending diversification (boil rice, rice Component 3: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 3,000.00 0.00 Implementati 2021-07-25 2021-09-19 2022-03-18 flake) rice cookers 25 lts, pots Access to Markets Quotations Envelope on , buckets, sacks, and rice flake machines 2nos to used in ARDC. BT-ARDC-B-236825-GO-DIR Pending Component 1:Strengthening / Procurement of plastic poles TF / A4224 Post Direct Selection Direct 4,600.00 0.00 Implementati 2021-08-12 2021-08-17 2021-09-21 2022-03-20 Farmer and Producer Groups from Greener Way Bhutan. on BT-ARDC-B-236827-GO- RFQ / Procurement of Pending Component 2: Enhancing Request for Single Stage - One Greenhouse to be used in TF / A4224 Post Open - National 2,400.00 0.00 Implementati 2021-08-10 2021-10-05 2022-04-03 Farmer Productivity Quotations Envelope ARDC for construction of fully on Automated Greenhouse. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Procurement Plan I. General 1. Project Information Country : Bhutan Borrower : Project Name : Food Security and Agriculture Productivity Project Loan Credit No. : P 1555513 2. Bank’s Approval Date of the Procurement Plan : October 20, 2016 In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. II. Goods, Works and Non consulting Services 1. Prior Review Threshold Method of Thresholds for Method Prior Review Procurement (USD equivalent) Threshold (USD) ICB (Goods) > 200,000 USD All contract above USD 100,000 RFB ( Goods) > USD 30,000 and up to USD 200,000 RFQ (Goods) Up to USD 30,000 ICB (Works) > 1.5 million All contract above RFB (Works) > 50,000 and up to USD USD 300,000 1.5 million RFQ (Works) Up to USD 50,000 ICB (Non- > 200,000 USD All contract above Consulting USD 100,000 Services) RFB (Non- < 200,000 USD Consulting Services) Direct Contracting No Threshold; meet paragraph 6.8, 6.9 and 6.10 of regulations Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified depending on the risk assessment and implementation of mitigation measures. In the case of contracts subject to prior review, before granting / agreeing to (a) a material extension of the stipulated time for performance of a contract; or (b) any substantial modification or waiver of the scope of services or other significant changes to the terms and conditions of such that the contract, including issuing; or (c) any change variation order or orders under such contract amendment (except in cases of extreme urgency) which would in aggregate, singly or combined with all variation orders or amendments previously issued, increase the original contract amount of the contract by more than 15% (fifteen percent); or (d) the proposed termination of the original price contract, the Borrower shall seek the Bank’s no objection to the proposed extension, modification, or change order. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable 3. Reference to Project operational/Procurement Manual Standard Bidding Documents agreed between Project and Bank will be used for all works, consultancy and goods procurements. 4. Any Other Special Procurement Arrangements: National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process.. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. II. Domestic Preference. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable The bid evaluation will be carried out as per agreed timeline in the Procurement Activity Schedule III. Selection of Consultant 1. Prior Review Threshold Method of Threshold (USD Prior Review Threshold Procurement Equivalent) (a) Quality and Cost No threshold All Contracts above USD Based Selection 70,000 for Firms; and (b) Quality Based No threshold above USD 50,000 for Selection Individuals (c) Selection Made No threshold Under a Fixed Budget (d) Least Cost Selection No threshold (e) Selection Based on < 100,000 Consultant’s Qualifications (f) Single Source As per Consultant Selection of firms Guidelines Para 3.9 (g) Selection of No threshold Individual Consultants Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 200,000 equivalent per contract, may comprise entirely of national consultants. PROCUREMENT Bhutan : Food Security and Agriculture Productivity Project PLAN General Information Country: Bhutan Bank’s Approval Date of the Original Procurement Plan: 2020-12-09 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155513 GPN Date: 2017-11-30 Project Name: Food Security and Agriculture Productivity Project Loan / Credit No: TF / A4224 S Executing Agency(ies): amtse Dzongkhag WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National BT-SD-229778-CW-RFQ / Procurement Pending Construction of weekend Component 3: Enhancing Request for Single Stage - One 2022-05- TF / A4224 Post Open - National Document - 1 7,500.00 0.00 Implementat 2021-09-18 2021-11-13 market shed under the Samtse Access to Markets Quotations Envelope 12 Envelope process ion Dzongkhag. (Non Bank-SPD) BT-SD-236745-CW-RFQ / National Construction of Packing Procurement Pending Component 3: Enhancing Request for Single Stage - One 2022-04- House at Yoeseltse and TF / A4224 Post Open - National Document - 1 40,069.00 0.00 Implementat 2021-08-17 2021-10-12 Access to Markets Quotations Envelope 10 Sangacholing Gewog, Samtse Envelope process ion Dzongkhag. (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-SD-205662-GO-RFQ / Procurement of 60-drip irrigation sets, 45-pruning saw, 45-pruning secateurs, 45-top pruner, 12-Sipaulin Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 27,000.00 1,758.00 Signed 2021-01-06 2021-03-03 2021-02-25 2021-08-30 sheets, 20-flexible pipes, 50- Farmer Productivity Quotations Envelope rolls of mulching plastics, 35- green shed nets, 20- vegetable planter, 30-low cost poly house and 200- seedling trays. BT-SD-206003-GO-RFQ / Procurement of Post Harvest and Processing Equipment Component 3: Enhancing Request for Single Stage - One such as Ginger peeler, Ginger TF / A4224 Post Open - National 23,000.00 2,574.49 Signed 2021-02-09 2021-04-06 2021-02-25 2021-10-03 Access to Markets Quotations Envelope grinder, Electric dryer, Ginger slicer, Weighing Balance and Ginger Packaging Machine. BT-SD-208285-GO-RFQ / Procurement of office furniture and equipment (file Component 3: Enhancing Request for Single Stage - One cabinet, table, executive chair, TF / A4224 Post Open - National 1,700.00 659.20 Signed 2021-02-06 2021-04-03 2021-02-25 2021-09-30 Access to Markets Quotations Envelope visitor chairs, file rack, weighing balance, display fridge and display shelves) BT-SD-229771-GO-RFB / Procurement of Agriculture tools and equipment: Green Shed Net, Nursery tray, Pending Mulching Plastic, water tanks, Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 93,000.00 0.00 Implementati 2021-07-15 2021-07-20 2021-08-31 2021-09-30 2021-11-04 2022-05-03 Flexible pipes, Plastic impulse Farmer Productivity Envelope on sprinkle, Watering can, Knapsacks sprayers, Rabbits nets(Nylon), Watering pump, and drip sets. BT-SD-229772-GO-DIR / Procurement of Vegetable seeds such as Cabbage, Pending Component 2: Enhancing Broccoli, M.green, Hybrid TF / A4224 Post Direct Selection Direct 14,300.00 0.00 Implementati 2021-07-15 2021-07-20 2021-08-24 2022-02-20 Farmer Productivity Onion, Hybrid tomato, pea, on Hybrid chilli, Beans and seeds potatoes. BT-SD-229773-GO-DIR / Pending Procurement of Bio-pesticide ( Component 2: Enhancing TF / A4224 Post Direct Selection Direct 750.00 0.00 Implementati 2021-07-15 2021-07-20 2021-08-24 2022-02-20 neem oil) to be issued to Farmer Productivity on project Gewogs. BT-SD-229774-GO-RFB / Procurement of Prefabricated Pending Poly house (20*5 m)-105 sets Component 2: Enhancing Single Stage - One TF / A4224 Post Request for Bids Open - National 77,000.00 0.00 Implementati 2021-07-15 2021-07-20 2021-08-31 2021-09-30 2021-11-04 2022-05-03 and 20*24- 2 sets to be Farmer Productivity Envelope on issued to project Gewogs under the project. BT-SD-236832-GO-RFQ / Procurement of Mini tillers Pending and with bed making Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 19,500.00 0.00 Implementati 2021-07-20 2021-09-14 2022-03-13 accessories (women-friendly)- Farmer Productivity Quotations Envelope on 19 sets to be issued to project Gewogs under the Dzongkhag. BT-SD-229776-GO-RFQ / Procurement of Convection Micro wave oven- 3 nos; Mixture grinder-3 nos; digital Pending Component 3: Enhancing Request for Single Stage - One weighing balance-3 nos; Fruit TF / A4224 Post Open - National 10,500.00 0.00 Implementati 2021-07-20 2021-09-14 2022-03-13 Access to Markets Quotations Envelope & Vegetable dehydration on machines-3 nos, sealing machine, packaging machine and plastic crates. BT-SD-229777-GO-RFQ / Pending Procurement of deep freezer Component 3: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 7,500.00 0.00 Implementati 2021-07-20 2021-09-14 2022-03-13 and display fridge to used in Access to Markets Quotations Envelope on sales outlests. Page 1 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 CDRESP Procurement Plan Project information: The World Bank approved a Global Environment Facility (GEF) grant to the Government of the People's Republic of China (GOC) for the China Distributed Renewable Energy Scale-up Program (CDRESP). The program is managed by the National Energy Administration (NEA), the Project Implementation Agency on behalf of GOC. Project Implementation agency: National Energy Administration of P.R.C Date of the Procurement Plan: January 26,2021 Period covered by this Procurement Plan: January 26, 2021 to June 30 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. A. The Bank’s Standard Procurement Documents (SPDs): The Bank’s SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures (Tendering and Bidding Law of the Peoples’ Republic of China, i.e. TBL promulgated by its Order No. 21 dated August 30, 1999 and the Implementation Regulations of the TBL promulgated by its State Council Order No. 613 dated November 30, 2011 and any amendments thereof) may be used with the following conditions to meet the requirements for open competitive procurement of paragraph 5.4 of the Procurement Regulations: a) All procurement notices shall be published in a national newspaper of wide circulation, or on a widely-used website / electronic portal with free access. b) A minimum of twenty (20) business days shall be given to Bidders between the date of such advertisement (or the date of availability of procurement documents, whichever is later and the deadline for the submission of bids). The advertisement and procurement documents shall specify the deadline for the submission of bids. Potential Bidders shall be allowed to inspect and purchase procurement documents at any time prior to the deadline for the submission of bids. c) Any Bidder/Consultant should be eligible to participate in a procurement process and to be awarded a Bank-financed contract as defined in paragraphs 3.21, 3.22 and 3.23 of the Procurement Regulations. d) Bidders/Consultants shall be allowed to submit bids/proposals by mail or in person. Bidders/consultants shall not be mandatory required to be present at the bid/proposal opening session. e) Bidders should not be required to register as a condition for inspecting or purchasing procurement documents, submitting its bid or receiving contract award. A winner Bidder, shall be given reasonable opportunity of registering (if required) before contract signing without any let or hindrance. Bidding shall not be restricted to any class of contractors. f) The winning bidder shall not be required, as a condition of award, to reduce its bid price No contract negotiation shall be permitted unless agreed in the procurement plan. g) No bid may be rejected solely on the basis that the bid price exceeds any cost estimate. Rejection of all bids or re-bidding shall not be allowed solely because the number of bids is less than three (3). Rebidding shall not take place without any sound justification. h) The Bank’s procurement documents for approaching the national market or any procurement document acceptable to the Bank shall be used. All procurement documents must require that bidders/consultants present a signed acceptance at the time of bidding or submitting a proposal, to be incorporated in any resulting contract, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i) The procurement documents shall disclose the newspaper and / or the electronic means in which the information on contract award shall be published. j) The contract award notification shall identify: (a) name and address of the Borrower’s Project Implementing Unit, (b) name and reference number of the contract being awarded and the selection method used (c) names of all Bidders/Consultants that submitted bids/proposals and their prices as read out at the bid opening meeting and as evaluated (d) names of all Bidders/ Consultants whose bids/proposals were rejected either as nonresponsive or as not meeting qualification criteria or were not evaluated, with the reasons therefore and (e) the name of the successful Bidder/Consultant, the final contract price, the contract duration and a summary of its scope. i) The Borrower shall implement an effective complaint mechanism allowing bidders or consultants to complain, and have their complaints handled and responded in a timely manner. Procurement documents should indicate the complaint mechanism procedure and provide the professional title and address of the officials to whom such protests should be sent. j) The Bank shall be allowed to review procurement documentation and activities related to the activities included in the procurement plan. C. Other national procurement arrangements: When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. D. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. E. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations is not applicable: F. Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations: Goods: Domestic Preference is applicable for those contracts identified in the Procurement Plan tables. Works: Domestic Preference is not applicable G. Other Relevant Procurement Information:. II. Goods and Works and non-consulting services. Procurement of goods, works, and services (other than consultants’ services) will be governed by the Procurement Regulation for IPF Borrower, July 2016, revised Nov. 2017 and Aug. 2018. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank Procurement Prior Comments Method Review Threshold 1 NCB Goods >=4,000,000 2 Shopping -- Goods 2. Procurement Packages with Methods and Time Schedule Unit: US$ 1 2 3 4 5 6 7 8 9 Ref. No. Contract Estimat Procurem Prequalificat Domestic Review Expected (Budget (Description) ed ent ion (yes/no) Preferen by Bank Bid- Comments line Cost Method ce (Prior / Opening No.) (yes/no) Post) Date Equipment for PMO 12,000 Shopping NA NA Post 2021.3 III. Selection of Consultants Selection of consultants will be governed by the Procurement Regulation for IPF Borrower, July 2016, revised Nov. 2017 and Aug. 2018. 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated Selection Prior Comments Method Review Threshold Competitive ≧2,000,000 methods (firms) Single Source ≧2,000,000 (firms) Competitive ≧400,000 methods (individuals) Single Source ≧400,000 (individuals) 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $500,000 equivalent per contract, may comprise entirely of national consultants. 3. Consultancy Assignments with Selection Methods and Time Schedule Unit:US$ 1 2 3 4 5 6 7 8 Contrac Ref. Description of Assignment Estimate Selectio Review Expected Comments1 t No. d n by Bank Contract number (Budge Cost Method (Prior / Date t line Post) No.) A1-CS- 1 Research on the policy mechanism of 150,000 CQS post 2021.7 2021- distributed renewable energy 001 A1-CS- 1 Research on the Technical Specification 150,000 CQS post 2021.7 2021- of Distributed Renewable Energy 002 connected with Energy Storage A1-CS- 1 Research on the application mode of 150,000 CQS post 2021.7 2021- distributed renewable energy combined 003 with energy storage system A1-CS- 1 Research on technical standards for 100,000 CQS post 2021.7 2021- energy storage batteries recycling 004 A3- Justification: PMOsta Since ff- December 2021- 2018, as the 001 new GEF project Direct preparation 3 PMO staff –Project manager 38,500 post 2021.2 selection expert (part time) , Ms. Fan Lijuan took part in CDRESP preparation, and quite 1 N: national consultant(s); I: international consultant(s) familiar with the content of the project, so PMO suggest to hire Ms. Fan Lijuan as project manager of CDRESP through direct selection PROCUREMENT China : China Distributed Renewable Energy Scale-Up Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2021-01-28 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162299 GPN Date: 2020-10-30 Project Name: China Distributed Renewable Energy Scale-Up Project Loan / Credit No: TF / B0141 N Executing Agency(ies): EA PMO WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual A1-CS-2021-001 / Research Consultant Under on the policy mechanism of TF / B0141 Policy support Post Qualification Open - National 150,000.00 0.00 2021-06-01 2021-06-01 2021-06-22 2021-06-15 2021-08-05 2021-09-04 2021-10-09 2022-03-01 Implementation distributed renewable energy Selection A1-CS-2021-002 / Research on the Technical Specification Consultant Under of Distributed Renewable TF / B0141 Policy support Post Qualification Open - National 150,000.00 0.00 2021-06-01 2021-06-01 2021-06-22 2021-06-15 2021-08-05 2021-09-04 2021-10-09 2022-06-01 Implementation Energy connected with Energy Selection Storage A1-CS-2021-003 / Research on the application mode of Consultant Under distributed renewable energy TF / B0141 Policy support Post Qualification Open - National 150,000.00 0.00 2021-06-01 2021-06-01 2021-06-22 2021-06-15 2021-08-05 2021-09-04 2021-10-09 2022-08-31 Implementation combined with energy storage Selection system A1-CS-2021-004 / Research Consultant on technical standards for Under TF / B0141 Policy support Post Qualification Open - National 100,000.00 0.00 2021-06-01 2021-06-01 2021-06-22 2021-06-15 2021-08-05 2021-09-04 2021-10-09 2022-08-31 energy storage batteries Implementation Selection recycling INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual A3-PMO-2021-001 / project Capacity building and project Under TF / B0141 Post Direct Selection Direct 38,500.00 0.00 2021-01-25 2021-01-28 2021-01-28 2021-01-28 2021-02-01 2021-12-31 manager contract management Implementation Page 1 PROCUREMENT PLAN (Textual Part) Project information: ETHIOPIA, LIVESTOCK AND FISHERIES SECTOR DEVELOPMENT PROJECT, P159382 Project Implementation agency: MINISTRY OF LIVESTOCK AND FISHERIES Date of the Procurement Plan: 31 October 2017 Period covered by this Procurement Plan: October 2017-April 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Sections 33(1)(a) and 35-48 of the Proclamation No. 649/2009, The Ethiopian Federal Government Procurement and Property Administration Proclamation, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. Procurement of Vehicles and Motor Cycles will be carried out by UNOPS considering the urgency that the vehicles and motor cycles are critically needed for project start up and the need to use UNOPS’s expertise on having long-term relationships with suppliers. PROCUREMENT Ethiopia : Livestock and Fisheries Sector Development Project PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2019-04-11 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159382 GPN Date: 2018-02-26 Project Name: Livestock and Fisheries Sector Development Project Loan / Credit No: IDA / 61650 S Executing Agency(ies): outhern Region Livestock and Foshery Sector Development Project WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ET-SR LFSDP-160651-GO- Pending Strengthening National Request for Single Stage - One 2020-05- DIR / procurement of works to IDA / 61650 Post Limited 3,700.00 0.00 Implementat 2020-03-06 2020-04-07 Institutions and Programs Quotations Envelope 22 maintain existing fish bonds ion ET-SR LFSDP-220435-CW- Pending RFQ / Drilling of a deep well Strengthening National Request for Single Stage - One 2021-04- IDA / 61650 Post Limited 64,500.00 0.00 Implementat 2021-02-28 2021-03-26 for Arba Minch Fish Hatchery Institutions and Programs Quotations Envelope 25 ion Center GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-SR LFSDP-109415-GO- Project Coordination, Request for Single Stage - One RFQ / Purchase of IT IDA / 61650 Monitoring and Evaluation, Post Limited 12,000.00 10,069.25 Completed 2019-04-15 2019-09-29 2019-05-18 2019-04-04 2019-05-28 2019-04-17 Quotations Envelope equipments for RCU and Knowledge Management ET-SR LFSDP-109461-GO- RFB / trocar and canula,burdizo ,forceps,apron ,teat cnnula,hoof trimmer, icebox,treatment syringe, sterilizer,automatic Strengthening National Single Stage - One IDA / 61650 Post Request for Bids Open - National 116,364.00 81,298.29 Completed 2019-04-06 2019-04-26 2019-04-11 2019-05-11 2019-05-27 2019-05-21 2019-05-27 2019-06-09 2019-06-27 2019-06-19 2019-07-24 vaccination syringe 20ml, Institutions and Programs Envelope treatment needle , vaccination needle ,stethoscope,thermometer, drenching gun,balling gun, stove,vaginal speculum ET-SR LFSDP-109466-GO- Project Coordination, RFQ / Procurement of office Request for Single Stage - One IDA / 61650 Monitoring and Evaluation, Post Limited 16,400.00 11,853.81 Completed 2019-04-15 2019-09-29 2019-05-18 2018-11-29 2019-05-28 2018-12-14 furniture for regional CU and Quotations Envelope and Knowledge Management woreda ET-SR LFSDP-111214-GO- RFB / regional forage seed varieties & demand: desho Strengthening National Single Stage - One grass, elephant grass, rhodess IDA / 61650 Post Request for Bids Open - National 187,400.00 137,902.40 Completed 2019-04-18 2019-06-02 2019-04-23 2019-06-04 2019-06-02 2019-06-14 2019-07-01 2019-07-02 2019-08-14 2019-07-07 2019-10-11 Institutions and Programs Envelope grass, panicum, cowpea,lablab,desmodium,pig eon pea, vatch ET-SR LFSDP-111251-GO- RFQ / feed improvement and Pending Strengthening National Request for Single Stage - One feed technologies such as IDA / 61650 Post Limited 32,600.00 0.00 Implementati 2019-04-30 2019-06-09 2019-06-19 Institutions and Programs Quotations Envelope chopper, molasses tanker, on urea molasses block molder. ET-SR LFSDP-146849-GO- RFB / procurement of medical field equipment and laboratory equipment: incubator ,water bath, air conditioning Strengthening National Single Stage - One IDA / 61650 Post Request for Bids Open - National 120,000.00 50,126.18 Completed 2019-12-01 2020-08-03 2019-12-06 2020-01-05 2020-01-21 2020-01-15 2020-02-11 2020-01-24 2020-04-30 2020-02-20 2020-04-30 machine,laboratory deep Institutions and Programs Envelope refrigeratorprotective stethoscope, tracor cannula, veterinary speculums,needle sterilise, castration instruments,er, ET-SR LFSDP-146966-GO- Project Coordination, RFQ / to procure laptops and Request for Single Stage - One IDA / 61650 Monitoring and Evaluation, Post Limited 12,000.00 4,226.91 Completed 2019-12-06 2020-01-01 2019-12-18 2020-03-09 2020-01-07 2020-03-09 desk tops for newly procured Quotations Envelope and Knowledge Management specialists . ET-SR LFSDP-147103-GO- RFB / regional forage seed varieties & demand: desho Pending Strengthening National Single Stage - One grass, elephant grass, rhodess IDA / 61650 Post Request for Bids Open - National 209,000.00 0.00 Implementati 2020-03-15 2020-03-25 2020-04-24 2020-05-09 2020-05-22 2020-06-21 Institutions and Programs Envelope grass, panicum, on cowpea,lablab,desmodium,pig eon pea, vatc ET-SR LFSDP-158340-GO- DIR / to procure fish feed Strengthening National IDA / 61650 Post Direct Selection Direct 6,258.35 3,861.08 Completed 2020-02-12 2020-02-07 2020-02-17 2020-03-01 2020-03-16 2020-03-24 2020-04-16 2020-03-27 which contains 40% crud Institutions and Programs protein Pending ET-SR LFSDP-158597-GO- Strengthening National Request for Single Stage - One IDA / 61650 Post Limited 1,200.00 0.00 Implementati 2020-02-23 2020-03-20 2020-04-20 RFQ / to procure water pump Institutions and Programs Quotations Envelope on ET-SR LFSDP-158603-GO- RFQ / to procure tables for Strengthening National Request for Single Stage - One IDA / 61650 Post Limited 5,000.00 2,090.83 Completed 2020-02-20 2020-02-28 2020-03-15 2020-03-15 2020-04-10 2020-03-30 newly employed staffs and Institutions and Programs Quotations Envelope shelves ET-SR LFSDP-160601-GO- Linking More Productive DIR / procurement of a day IDA / 61650 Post Direct Selection Direct 84,000.00 14,421.30 Completed 2020-02-24 2020-01-14 2020-03-10 2020-05-29 2020-04-15 2020-01-12 2020-05-15 2020-03-05 Farmers to Markets old chicken Page 1 ET-SR LFSDP-160621-GO- Linking More Productive DIR / procurement of layer IDA / 61650 Post Direct Selection Direct 136,572.00 3,120.51 Completed 2020-02-24 2020-07-02 2020-03-10 2020-05-01 2020-04-13 2020-07-07 2020-05-13 2020-07-07 Farmers to Markets and broiler chicken ET-SR LFSDP-160643-GO- Linking More Productive DIR / to procure concentrated IDA / 61650 Post Direct Selection Direct 153,000.00 30,274.43 Completed 2020-02-24 2020-05-19 2020-03-10 2020-05-22 2020-04-03 2020-06-21 2020-05-03 2020-06-29 Farmers to Markets feed for livestocks ET-SR LFSDP-160644-GO- Linking More Productive DIR / to procure concentrated IDA / 61650 Post Direct Selection Direct 101,000.00 41,989.90 Completed 2020-02-24 2020-05-30 2020-03-10 2020-06-06 2020-03-30 2020-06-06 2020-04-30 2020-07-05 Farmers to Markets feed for chickens ET-SR LFSDP-171554-GO- RFQ / to procure deep Strengthening National Request for Single Stage - One refrigerator, incubator and IDA / 61650 Post Limited 33,000.00 11,258.45 Completed 2020-05-20 2020-06-08 2020-06-19 2020-07-13 2020-06-25 2020-07-14 Institutions and Programs Quotations Envelope liquid nitrogen container 2 liter ET-SR LFSDP-171560-GO- RFB / to procure milk cans, butter churner, pullet and chicken transportation coop,egg collection Pending Strengthening National Single Stage - One tray,weighting balance, IDA / 61650 Post Request for Bids Open - National 157,000.00 0.00 Implementati 2020-05-03 2020-05-08 2020-06-07 2020-06-12 2020-06-23 2020-07-07 Institutions and Programs Envelope strainer,overall,boots,weightin on g scale, heart girth, ear tag applicator, stew pot, plate, bowl,fish transportation coup,cream separator. ET-SR LFSDP-171729-GO- RFQ / to procure tablet for RPCU coordinator and ME Project Coordination, Request for Single Stage - One specialist, colour printer and IDA / 61650 Monitoring and Evaluation, Post Limited 33,000.00 384.19 Completed 2020-05-13 2020-06-25 2020-05-26 2020-07-29 2020-06-07 2020-08-12 Quotations Envelope printer for RPCU , laptop for and Knowledge Management woreda project finance officers , LCD for woredas, ET-SR LFSDP-181010-GO- DIR / to procure basic and pre- basic forage seeds of Desmodium intortum(green Pending Strengthening National leaf), Desmodium IDA / 61650 Post Direct Selection Direct 26,000.00 0.00 Implementati 2020-06-20 2020-06-24 2020-07-03 2020-07-19 Institutions and Programs uncinatum(silverleaf), on Rhodes,Sesbania, Alfaalfa (Medicago Sative), Vetch, Punicum(guinea grass). Under ET-SR LFSDP-199573-GO- Linking More Productive Request for Single Stage - One IDA / 61650 Post Limited 16,500.00 0.00 Implementati 2020-10-19 2020-11-27 2020-12-01 RFQ / to procure field bags Farmers to Markets Quotations Envelope on ET-SR LFSDP-201436-GO- RFB / To procure veterinary field equipment and laboratory materials by lot: Lot1- field equipment: glove, Pending Strengthening National Single Stage - One vaccination needle, AI gun, IDA / 61650 Post Request for Bids Open - National 106,000.00 0.00 Implementati 2020-10-29 2020-11-03 2020-12-03 2020-12-10 2020-12-24 2021-01-24 Institutions and Programs Envelope alcohol, syringe, CMT kit on reagent, cannula; and Lot-2 - Lab equip: incubator, water bath, Deep freezer, Deionizer, disposal can ET-SR LFSDP-207164-GO- RFQ / to procure fishery development materials: Lot1: PH meter, DO meter, fishing Pending Strengthening National Request for Single Stage - One twine, polyethylene bags, Ice IDA / 61650 Post Limited 25,000.00 0.00 Implementati 2020-12-05 2020-12-21 2021-01-20 Institutions and Programs Quotations Envelope box, weighing scale. Lot 2: on beach seine net, life jackets, fibre boat,scoop net, out board engine ET-SR LFSDP-207166-GO- Pending DIR / to procure fish feed Strengthening National IDA / 61650 Post Direct Selection Direct 4,250.00 0.00 Implementati 2020-11-30 2020-12-04 2020-12-20 2020-12-25 which contains 40% crud Institutions and Programs on protein. ET-SR LFSDP-211326-GO- RFQ / to procure forage Pending development materials spade, Strengthening National Request for Single Stage - One IDA / 61650 Post Limited 7,500.00 0.00 Implementati 2020-12-27 2021-01-11 2021-01-31 hoe with three fingers, garden Institutions and Programs Quotations Envelope on rake, wheelbarrow, plastic water can, tape measure ET-SR LFSDP-237318-GO- Pending Strengthening National Request for Single Stage - One RFQ / to procure animal IDA / 61650 Post Limited 32,500.00 0.00 Implementati 2021-06-05 2021-06-22 2021-07-07 Institutions and Programs Quotations Envelope forage hay bell on ET-SR LFSDP-238731-GO- RFQ / Insemination gun, Pending Strengthening National Request for Single Stage - One universal sheath, arm length IDA / 61650 Post Limited 82,000.00 0.00 Implementati 2021-06-14 2021-07-05 2021-08-04 Institutions and Programs Quotations Envelope glove, thermos flask, denature on 70%, savalon, rubber boat NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 PROCUREMENT PLAN Project information: COVID-19 EMERGENCY Response and Health Systems Preparedness Project (P173775) Project Implementation agency: Ministry of Public Health (MoPH) Government of Islamic Republic of Afghanistan Date of the Procurement Plan: 15 APRIL 2020 Period covered by this Procurement Plan: 15 April 2020 to 14 Oct 2020 (the contracts duration for NGOs and UNs are flexible to be extended to March 31, 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Procurement Law of Afghanistan Revised 2017 such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) Only the model bidding documents acceptable to the World Bank shall be used for all national open competitive procurement. 2) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) There shall be no negotiations of contract price at post contract stage or termination of the contract - on grounds of operation of Price Adjustment stipulated in a signed contract exceeding a specified percentage. 6) No preference of any kind shall be given to national bidders in the bidding process. When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. HEIS is recommended for this project. Other Relevant Procurement Information. Since this is an emergency response project there will be no prior review for all procurement during the relief phase. Procurement of items for emergency requirements will follow methods of Direct Contracting, Procurement from UN Agencies, Limited bidding, etc. This project will also have higher value threshold for shopping and National procurement, as applicable in emergency projects. PROCUREMENT Afghanistan : Afghanistan COVID-19 Emergency Response and Health Systems Preparedness Project PLAN General Information Country: Afghanistan Bank’s Approval Date of the Original Procurement Plan: 2020-06-04 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173775 GPN Date: 2020-09-07 Project Name: Afghanistan COVID-19 Emergency Response and Health Systems Preparedness Project Loan / Credit No: IDA / D5930, IDA / D7810, TF / B5099 M Executing Agency(ies): inistry of Public Health WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AF-MOPH-174587-GO-RFQ / Pending Procurement of 20 Working Component 2: Health Care Request for Single Stage - One IDA / D5930 Post Open - National 3,896.00 0.00 Implementati 2020-06-05 2020-07-31 2021-01-27 Desks and Chairs with a Strengthening Quotations Envelope on Meeting Table for 20 People AF-MOPH-174583-GO-DIR / Pending Component 2: Health Care Electricity Facilitation at Home IDA / D5930 Post Direct Selection Direct 8,961.00 0.00 Implementati 2020-05-21 2020-05-26 2020-06-30 2020-12-27 Strengthening for 18 Key Staff on AF-MOPH-173538-GO-DIR / Pending Component 2: Health Care Request for Single Stage - One Purchasing Office Laptop IDA / D5930 Post Open - National 23,377.00 0.00 Implementati 2020-06-05 2020-07-31 2021-01-27 Strengthening Quotations Envelope Computers on AFG/MOPH/GCMU/COVAX/03 Pending / Procurement of COVID - 19 Component 1: Emergency IDA / D7810 Prior Direct Selection Direct 43,000,000.00 0.00 Implementati 2021-05-01 2021-05-02 2021-05-06 2022-12-30 vaccine through agreement COVID-19 Response on with UNICEF Component 4: AFG/MOPH/GCMU/COVAX/04 Pending Implementation Management / Procurement of COVID-19 IDA / D7810 Prior Direct Selection Direct 37,000,000.00 0.00 Implementati 2021-05-11 2021-05-16 2021-06-20 2021-12-17 and Monitoring and vaccine on Evaluation NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AF-MOPH-174581-NC-DIR / Pending Component 2: Health Care Internet Facilitation at Home IDA / D5930 Post Direct Selection 8,052.00 0.00 Implementati 2020-05-21 2020-05-22 2020-05-28 2020-11-01 Strengthening for 18 Key Staff on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AFG/MOPH/GCMU/COVID- 19/33 / Procurement of critical products (PPE, Mask, gloves, oxygen concentrator, Component 1: Emergency UN Agencies IDA / D5930 Post Direct 23,000,000.00 23,000,000.00 Signed 2020-05-16 2020-04-14 2020-11-12 portable ventilator, glassware, COVID-19 Response (Direct) laraygoscope) and risk communication activities (UNICEF) AFG/MOPH/GCMU/COVID- 19/34 / Expension and support the laboratory and diagnostic systems and Component 2: Health Care UN Agencies IDA / D5930 Post Direct 4,772,750.00 4,772,713.00 Signed 2020-05-16 2020-04-23 2020-11-12 provide technical assistance Strengthening (Direct) and expertise through deployment of international and national experts(WHO) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AFG/MOPH/GCMU/COVID- 19/01 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 522,375.00 567,915.51 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 10 RRT team) in Badakhshan province Page 1 AFG/MOPH/GCMU/COVID- 19/02 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 452,813.00 492,049.34 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 5 RRT team in Badghis AFG/MOPH/GCMU/COVID- 19/03 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 522,375.00 565,000.11 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward(Case Management & Isolution) and running 10 RRT team) in Baghlan province AFG/MOPH/GCMU/COVID- 19/04 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 900,000.00 973,438.80 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-06-04 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 50 bed hospital (Case Management & Isolution) and running 15 RRT team) in Balkh province AFG/MOPH/GCMU/COVID- 19/05 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 452,813.00 477,584.66 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-04-29 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 5 RRT team) in Bamyan province AFG/MOPH/GCMU/COVID- 19/06 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 452,813.00 478,977.62 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 5 RRT team) in Daikundi province AFG/MOPH/GCMU/COVID- 19/07 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 1,000,000.00 1,068,253.51 Signed 2020-04-06 2020-04-18 2020-04-18 2020-04-18 2020-05-03 2020-05-13 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 50 bed hospital (Case Management & Isolution) and running 6 RRT team) in Farah province AFG/MOPH/GCMU/COVID- 19/08 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 550,200.00 595,095.58 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-13 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 12 RRT team) in Faryab province AFG/MOPH/GCMU/COVID- 19/09 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 564,113.00 609,791.57 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed hospital (Case Management & Isolution) and running 13 RRT team) in Ghazni province AFG/MOPH/GCMU/COVID- 19/10 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 480,638.00 519,812.15 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 8 RRT team) in Ghor province AFG/MOPH/GCMU/COVID- 19/11 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 578,025.00 624,788.97 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed hospital (Case Management & Isolution) and running 14 RRT team) in Helmand province Page 2 AFG/MOPH/GCMU/COVID- 19/12 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 1,500,000.00 1,622,365.70 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 100 bed hospital (Case Management & Isolution) and running 21 RRT team) in Herat province AFG/MOPH/GCMU/COVID- 19/13 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 466,725.00 505,041.26 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-04-30 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 6 RRT team) in Jawzjan province AFG/MOPH/GCMU/COVID- 19/14 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 1,700,000.00 663,287.64 Signed 2020-04-06 2020-04-06 2020-04-18 2020-06-06 2020-05-03 2020-08-06 2024-03-30 COVID-19 Response Survillance, IPC, Establishment of 100 bed hospital (Case Management & Isolution) and running 50 RRT team) in Kabul province AFG/MOPH/GCMU/COVID- 19/15 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 900,000.00 974,185.10 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-04-30 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 50 bed hospital (Case Management & Isolution) and running 14 RRT team) in Kandahar province AFG/MOPH/GCMU/COVID- 19/16 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 466,725.00 504,934.90 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 6 RRT team) in Khost province AFG/MOPH/GCMU/COVID- 19/17 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 452,813.00 484,537.69 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed hospital (Case Management & Isolution) and running 5 RRT team) in Kunar province AFG/MOPH/GCMU/COVID- 19/18 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 800,000.00 865,478.55 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 50 bed hospital (Case Management & Isolution) and running 11 RRT team) in Kunduz province AFG/MOPH/GCMU/COVID- 19/19 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 452,813.00 482,543.31 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 5 RRT team) in Laghman province AFG/MOPH/GCMU/COVID- 19/20 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 438,900.00 481,302.29 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-06-06 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed hospital (Case Management & Isolution) and running 4 RRT team) in Logar province AFG/MOPH/GCMU/COVID- 19/21 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 1,000,000.00 1,097,120.36 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-06-06 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 50 bed hospital (Case Management & Isolution) and running 17 RRT team) in Nangarhar province Page 3 AFG/MOPH/GCMU/COVID- 19/22 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 985,950.00 1,054,052.81 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-13 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 50 bed hospital (Case Management & Isolution) and running 2 RRT team) in Nimroz province AFG/MOPH/GCMU/COVID- 19/23 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 283,208.87 306,553.17 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-20 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 15 bed ward (Case Management & Isolution) and running 3 RRT team) in Nooristan province AFG/MOPH/GCMU/COVID- 19/24 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 800,000.00 857,507.81 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 50 bed hospital (Case Management & Isolution) and running 6 RRT team) in Pakya province AFG/MOPH/GCMU/COVID- 19/25 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 494,550.00 535,282.24 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 8 RRT team) in Paktika province AFG/MOPH/GCMU/COVID- 19/26 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 438,900.00 475,077.60 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed hospital (Case Management & Isolution) and running 4 RRT team) in Samangan province AFG/MOPH/GCMU/COVID- 19/27 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 466,725.00 504,893.66 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-04-30 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 6 RRT team) in Saripul province AFG/MOPH/GCMU/COVID- 19/28 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 536,288.00 589,806.06 Signed 2020-04-06 2020-04-06 2020-04-18 2020-07-22 2020-05-03 2020-08-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed hospital (Case Management & Isolution) and running 11 RRT team) in Takhar province AFG/MOPH/GCMU/COVID- 19/29 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 438,900.00 475,020.78 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-03 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward(Case Management & Isolution) and running 4 RRT team) in Urozgan province AFG/MOPH/GCMU/COVID- 19/30 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 480,638.00 520,255.43 Signed 2020-04-06 2020-04-06 2020-04-18 2020-04-18 2020-05-03 2020-05-02 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed ward (Case Management & Isolution) and running 7 RRT team) in Wardak province AFG/MOPH/GCMU/COVID- 19/31 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency (Public awareness,Active IDA / D5930 Post Direct Selection Direct 438,900.00 481,811.25 Signed 2020-04-06 2020-04-06 2020-04-18 2020-07-22 2020-05-03 2020-07-29 2024-03-31 COVID-19 Response Survillance, IPC, Establishment of 20 bed hospital (Case Management & Isolution) and running 4 RRT team) in Zabul province Page 4 AFG/MOPH/GCMU/COVID- 19/35 / Implementation of Component 4: conducting monitoring Implementation Management IDA / D5930 Post Direct Selection Direct 1,300,000.00 1,320,681.86 Signed 2020-04-06 2020-04-18 2020-04-18 2020-07-29 2020-05-03 2020-09-10 2024-03-31 (performance assessment) as and Monitoring and a Third party (TPM) in 34 Evaluation Province AFG/MOPH/GCMU/COVID- 19/32 / Implementation of Component 1: Emergency COVID-19 ERHS Preparedness IDA / D5930 Post Direct Selection Direct 1,302,901.00 1,302,770.66 Signed 2020-04-06 2020-04-06 2020-04-18 2020-05-11 2020-05-03 2020-05-27 2024-03-31 COVID-19 Response Project in Parwan, Kapisa and Panjshir provinces AFG/MOPH/GCMU/COVID- 19/36 / Implementation of COVID-19 Emergency Response and Health System Preparedness Project through Component 1: Emergency IDA / D5930 Post Direct Selection Direct 3,319,535.00 3,293,770.89 Terminated 2020-08-09 2020-07-02 2020-08-14 2020-06-13 2020-08-20 2020-09-09 2021-02-16 establishment of 120 bed COVID-19 Response hospital (Case Management & Isolation) in Kabul city (Afghan-Japan hospital) and 30% contingency fund AFG/MOPH/GCMU/COVID- 19/01-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 807,374.00 631,226.61 Signed 2020-08-01 2020-10-27 2020-08-11 2020-10-28 2020-10-05 2020-11-12 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 10 RRT team in Badakhshan province including Purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/02-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public Component 1: Emergency awareness,Active Survillance, IDA / D5930 Post Direct Selection Direct 652,810.00 380,576.86 Signed 2020-08-01 2020-10-27 2020-08-11 2020-10-28 2020-10-05 2020-11-16 2021-05-02 COVID-19 Response IPC, Establishment of 20 bed ward in Badghis including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/03-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public Component 1: Emergency awareness,Active Survillance, IDA / D5930 Post Direct Selection Direct 744,632.00 488,075.20 Signed 2020-08-01 2020-10-27 2020-08-11 2020-10-28 2020-10-05 2020-11-11 2021-05-02 COVID-19 Response IPC, Establishment of 20 bed ward in Baghlan province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/04-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 1,322,766.00 811,155.14 Signed 2020-08-01 2020-10-27 2020-08-11 2020-11-12 2020-10-05 2020-12-01 2021-06-02 IPC, Establishment of 50 bed COVID-19 Response hospital and running 15 RRT team) in Balkh province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/05-AMND#1 / Implementation of COVID-19 ERHSPProject through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 709,606.00 516,900.34 Signed 2020-08-01 2020-10-27 2020-08-11 2020-10-28 2020-10-05 2020-11-12 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 5 RRT team) in Bamyan province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/06-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 828,047.00 505,151.31 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-14 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 5 RRT team) in Daikundi province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/07-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 1,487,278.00 694,896.83 Signed 2020-08-01 2020-10-27 2020-08-11 2020-10-28 2020-10-05 2020-11-17 2021-05-02 IPC, Establishment of 50 bed COVID-19 Response hospital and running 6 RRT team) in Farah province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/08-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 884,898.00 573,908.49 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-15 2020-11-17 2021-04-13 IPC, Establishment of 20 bed COVID-19 Response ward and running 12 RRT team) in Faryab province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/09-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 892,572.00 723,010.43 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-12 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response hospital and running 13 RRT team) in Ghazni province including purchasing oxygen gas and 20% contingency fund Page 5 AFG/MOPH/GCMU/COVID- 19/10-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 809,443.00 544,406.79 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-22 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 8 RRT team) in Ghor province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/11-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 769,090.00 530,706.02 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-17 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response hospital and running 14 RRT team) in Helmand province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/12-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 1,583,210.00 1,733,408.54 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-11 2021-05-02 IPC, Establishment of 100 bed COVID-19 Response hospital and running 21 RRT team) in Herat province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/13-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 658,071.00 473,961.15 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-12 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 6 RRT team) in Jawzjan province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/14-AMND#1 / Implementation of COVID-19 Component 1: Emergency ERHSP Project through (Public IDA / D5930 Post Direct Selection Direct 1,374,285.00 417,433.60 Signed 2020-08-01 2021-01-30 2020-08-11 2021-01-30 2020-10-05 2021-02-28 2021-08-04 COVID-19 Response awareness,Active Survillance, IPC running 50 RRT team) in Kabul province AFG/MOPH/GCMU/COVID- 19/15-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 1,235,104.00 892,882.27 Signed 2020-08-01 2020-10-28 2020-08-11 2020-11-12 2020-10-05 2020-12-06 2021-06-02 IPC, Establishment of 50 bed COVID-19 Response hospital and running 14 RRT team) in Kandahar province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/16-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 681,328.00 567,198.28 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-17 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 6 RRT team) in Khost province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/17-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 676,060.00 466,345.76 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-16 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response hospital and running 5 RRT team) in Kunar province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/18-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 1,259,689.00 765,101.09 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-18 2020-10-05 2020-11-16 2021-05-02 IPC, Establishment of 50 bed COVID-19 Response hospital and running 11 RRT team) in Kunduz province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/19-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 689,415.00 411,267.99 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-12 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 5 RRT team) in Laghman province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/20-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 612,282.00 459,752.01 Signed 2020-08-01 2020-10-28 2020-08-11 2020-11-18 2020-10-05 2020-12-05 2021-06-02 IPC, Establishment of 20 bed COVID-19 Response hospital and running 4 RRT team) in Logar province including purchasing oxygen gas and 20% contingency fund Page 6 AFG/MOPH/GCMU/COVID- 19/21-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 1,583,210.00 1,078,226.52 Signed 2020-08-01 2020-10-28 2020-08-11 2020-11-18 2020-10-05 2020-12-17 2021-06-02 IPC, Establishment of 50 bed COVID-19 Response hospital and running 17 RRT team) in Nangarhar province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/22-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 1,412,047.00 669,617.85 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-17 2021-05-02 IPC, Establishment of 50 bed COVID-19 Response hospital and running 2 RRT team) in Nimroz province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/23-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 395,280.00 356,147.07 Signed 2020-08-01 2020-10-27 2020-08-11 2020-10-28 2020-10-05 2020-11-12 2021-05-19 IPC, Establishment of 15 bed COVID-19 Response ward and running 3 RRT team) in Nooristan province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/24-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 1,065,902.00 731,541.16 Signed 2020-08-01 2020-10-27 2020-08-11 2020-10-28 2020-10-05 2020-11-18 2021-05-02 IPC, Establishment of 50 bed COVID-19 Response hospital and running 6 RRT team) in Pakya province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/25-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 116,883.12 447,574.82 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-14 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 8 RRT team) in Paktika province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/26-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 589,511.00 392,766.37 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-16 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response hospital and running 4 RRT team) in Samangan province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/27-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 657,906.00 425,907.70 Signed 2020-08-01 2020-10-27 2020-08-11 2020-10-28 2020-10-05 2020-11-21 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 6 RRT team) in Saripul province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/28-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 105,194.81 463,247.11 Signed 2020-08-01 2020-10-28 2020-08-11 2020-12-19 2020-10-05 2021-02-03 2021-08-02 IPC, Establishment of 20 bed COVID-19 Response hospital and running 11 RRT team) in Takhar province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/30-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 691,149.00 967,172.80 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-02 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 7 RRT team) in Wardak province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/31-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 618,731.00 368,350.61 Signed 2020-08-01 2020-10-28 2020-08-11 2020-12-19 2020-10-05 2021-02-03 2021-08-02 IPC, Establishment of 20 bed COVID-19 Response hospital and running 4 RRT team) in Zabul province including purchasing oxygen gas and 20% contingency fund AFG/MOPH/GCMU/COVID- 19/29-AMND#1 / Implementation of COVID-19 ERHSP Project through (Public awareness,Active Survillance, Component 1: Emergency IDA / D5930 Post Direct Selection Direct 645,550.94 424,655.68 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-10 2021-05-02 IPC, Establishment of 20 bed COVID-19 Response ward and running 4 RRT team) in Urozgan province including purchasing oxygen gas and 20% contingency fund Page 7 AFG/MOPH/GCMU/COVID- 19/35-AMND#1 / Component 4: Implementation of conducting Implementation Management Pending IDA / D5930 Post Direct Selection Direct 2,600,000.00 0.00 2020-08-01 2020-08-11 2020-10-05 2021-09-14 monitoring (performance and Monitoring and Implementation assessment) as a Third party Evaluation (TPM) in 34 Province AFG/MOPH/GCMU/COVID- 19/36-AMND#1 / Implementation of COVID-19 Emergency Response and Health System Preparedness Component 1: Emergency Pending IDA / D5930 Prior Direct Selection Direct 6,639,070.99 0.00 2020-08-01 2020-08-11 2020-10-15 2021-02-02 Project through establishment COVID-19 Response Implementation of 120 bed hospital in Kabul city (Afghan-Japan hospital) Purchasing oxygen gas and 30% contingency fund AFG/MOPH/GCMU/COVID- 19/32-AMND#1 / Implementation of COVID-19 ERHSP Project through Estab. of 20 bed ward and running 7 Component 1: Emergency RRT team in Parwan, 20 bed IDA / D5930 Post Direct Selection Direct 1,657,954.30 1,175,538.30 Signed 2020-08-01 2020-10-28 2020-08-11 2020-10-28 2020-10-05 2020-11-27 2021-05-02 COVID-19 Response ward and running 5 RRT team in Kapisa, 15 bed hospital and running 2 RRT team in Panjshir. oxygen, 20% contingency AFG/MOPH/GCMU/COVAX/01 / Procurement of UN to Component 2: Health Care Pending TF / B5099 Prior Direct Selection Direct 1,000,000.00 0.00 2021-05-01 2021-05-03 2021-05-07 2022-12-31 provide training of new Strengthening Implementation vaccinators with WHO AFG/MOPH/GCMU/COVAX/02 / Development of Component 3: Mitigation of Pending communication messages and IDA / D7810 Prior Direct Selection Direct 3,000,000.00 0.00 2021-05-01 2021-05-03 2021-05-07 2022-12-31 Social Impacts Implementation communication campaign with UNICEF AFG/MOPH/GCMU/COVID- 19/37 / Implementation of COVID-19 Emergency Response and Health System Component 1: Emergency Preparedness Project through IDA / D5930 Prior Direct Selection Direct 3,512,505.00 0.00 Under Review 2021-05-11 2021-06-21 2021-05-21 2021-07-25 2022-01-21 COVID-19 Response establishment of 120 bed hospital (Case Management & Isolation) in Kabul city (Afghan-Japan hospital) AFG/MOPH/GCMU/COVID- 19/38 / Implementation of COVID-19 ERHSP Project through establishment of 50 Component 1: Emergency Under IDA / D5930 Prior Direct Selection Direct 1,818,000.00 0.00 2021-05-29 2021-06-08 2021-05-31 2021-06-14 2021-12-13 beds hospital (Case COVID-19 Response Implementation Management & Isolation) in Kabul city (Qasaba 50 beds hospital) Page 8 Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of Procurement Regulations. Other Conditions: 1. Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: a. procurement processes involving contract negotiations as, described in paragraphs 6.34-36 of Section VI of the Procurement Regulation for Borrowers; b. competitive dialogue; c. sustainable procurement; and d. best and final offer. 2. Use of Standard Procurement Documents: For all procurements under the project, the Bank’s Standard Procurement Documents (or other Model Procurement Documents agreed with the Bank) shall be used. 3. Request for Bids (Open-National), if allowed in the Procurement Plan, will be carried out under the Bank’s Procurement Regulations following procedures for Open Tendering Method (OTM) of the People’s Republic of Bangladesh (Public Procurement Act 2006 - PPA, 1st amendment to PPA (2009) and The Public Procurement Rules 2008, as amended in August 2009) using standard/model bidding documents satisfactory to the Bank. For the purpose of Request for Bids (Open-National) the following shall apply: a. Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; b. Bids should be submitted and opened in public in one location immediately after the deadline for submission; c. Lottery in award of contracts shall not be allowed; d. Bidders’ qualification/experience requirement shall be mandatory; e. Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost. PROCUREMENT Bangladesh : Bangladesh Regional Connectivity Project 1 PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2018-01-05 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154580 GPN Date: 2018-03-24 Project Name: Bangladesh Regional Connectivity Project 1 Loan / Credit No: IDA / 60020 M Executing Agency(ies): inistry of Commerce WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 2: Enhance trade WD1 / Renovation of office sector coordination and Request for Single Stage - One 2019-01- space for setup secretariat for IDA / 60020 economic empowerment and Post Open - National 12,658.00 11,817.27 Signed 2018-10-28 2018-12-23 2019-04-18 Quotations Envelope 22 Bangladesh Trade Portal. opportunities in trade for women Component 2: Enhance trade BRCP/MOC/WD-1/2 / sector coordination and Renovation of Remaining Request for Single Stage - One 2019-01- IDA / 60020 economic empowerment and Post Open - National 7,595.00 6,993.42 Signed 2018-11-05 2018-12-31 2019-01-16 works for Trade Portal Quotations Envelope 30 opportunities in trade for Secretariat at BRCP Premises women GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD3-1/RFQ / Hiring vehicles Component 2: Enhance trade for 05 Months before sector coordination and Request for Single Stage - One appointment of Project Team IDA / 60020 economic empowerment and Post Limited 6,329.00 5,651.40 Signed 2017-12-27 2018-01-02 2018-01-14 2018-01-11 2018-06-13 Quotations Envelope and floating the same through opportunities in trade for OTM women Component 1: Invest in infrastructure, systems and BRCP/MOC/GD-08 / procedures to modernize key Development & Maintenance IDA / 60020 Post Direct Selection Direct 18,073.00 16,283.83 Signed 2019-08-25 2019-09-04 2019-08-30 2019-09-09 2019-10-04 2019-10-23 2021-06-25 selected land ports essential of Accounting Software for trade wit h India, Bhutan and Nepal NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Enhance trade BRCP/MOC/NSD-02 / sector coordination and Under Appointment of Overseas Single Stage - One IDA / 60020 economic empowerment and Post Request for Bids Open - National 63,300.00 0.00 Implementati 2018-10-28 2018-11-11 2018-11-02 2018-12-18 2018-11-30 2018-12-20 2018-12-30 2019-01-27 2021-06-30 Study Tour/Training Envelope opportunities in trade for on Organizer women Component 2: Enhance trade BRCP/MOC/NSD/03 / sector coordination and Single Stage - One Vehicles Rental Services for IDA / 60020 economic empowerment and Post Request for Bids Open - National 126,582.00 0.00 Canceled 2018-11-07 2018-11-11 2018-11-10 2018-12-18 2018-12-01 2018-12-20 2018-12-31 2019-01-03 2019-01-31 2021-12-31 Envelope BRCP, MOC opportunities in trade for women Component 1: Invest in infrastructure, systems and BRCP/MOC/GD-05 / Vehicle procedures to modernize key Single Stage - One IDA / 60020 Post Request for Bids Open - National 126,506.00 95,370.97 Signed 2019-07-28 2019-04-28 2019-08-02 2019-09-13 2019-05-21 2019-10-13 2019-06-18 2019-11-17 2019-07-04 2022-12-31 Rental Services for BRCP-1 selected land ports essential Envelope for trade wit h India, Bhutan and Nepal Component 2: Enhance trade BRCP/MOC/SD-31 / sector coordination and Pending Request for Single Stage - One Preparation of Video clip for IDA / 60020 economic empowerment and Post Limited 5,950.00 0.00 Implementati 2021-07-16 2021-09-10 2021-10-10 Quotations Envelope Bangladesh Trade Portal opportunities in trade for on women CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Enhance trade BRCP/MOC/SD-24 / sector coordination and Consultant Development of Project IDA / 60020 economic empowerment and Post Qualification Open - National 12,658.00 16,758.07 Signed 2018-12-18 2019-03-22 2019-01-08 2019-02-21 2019-07-21 2019-03-14 2019-09-02 2019-04-11 2019-09-23 2019-07-10 Website BRCP-1 (All opportunities in trade for Selection component) women Component 2: Enhance trade sector coordination and Consultant SD3 / User Satisfaction Pending IDA / 60020 economic empowerment and Post Qualification Open - National 44,304.00 0.00 2020-09-10 2020-10-01 2020-11-28 2020-12-28 2021-02-01 2021-07-01 Survey of BTP Implementation opportunities in trade for Selection women Component 2: Enhance trade SD1 / Hiring consultancy firm sector coordination and (s) for conducting surveys / Quality And Cost- IDA / 60020 economic empowerment and Post Open - National 150,633.00 0.00 Canceled 2018-11-22 2018-12-13 2019-01-26 2019-02-23 2019-03-25 2019-04-29 2019-06-03 2021-06-30 studies as suggested by Based Selection opportunities in trade for NTTFC women Page 1 SD2 / Hiring Component 2: Enhance trade Consultants/Firms for sector coordination and conducting selected Quality And Cost- IDA / 60020 economic empowerment and Prior Open - International 759,494.00 0.00 Canceled 2018-12-30 2019-01-20 2019-03-19 2019-04-02 2019-05-02 2019-06-06 2019-07-11 2021-06-30 research/studies for Based Selection opportunities in trade for promoting Women Traders in women Bangladesh Component 2: Enhance trade BRCP/MOC/SD-01 / sector coordination and Conducting 03 Nos. of Quality And Cost- Under IDA / 60020 economic empowerment and Post Open - National 56,962.00 0.00 2018-11-22 2019-01-03 2018-12-13 2019-01-26 2019-05-14 2019-02-23 2019-06-19 2019-03-25 2019-07-23 2019-04-29 2019-06-03 2019-11-30 Surveys/studies suggested by Based Selection Implementation opportunities in trade for NTTFC women BRCP/MOC/SD-19 / Design Component 2: Enhance trade and implement training sector coordination and program for increasing Quality And Cost- IDA / 60020 economic empowerment and Post Open - National 493,670.00 221,481.25 Signed 2019-03-12 2018-12-27 2019-03-19 2019-01-01 2019-05-02 2019-06-14 2019-05-30 2019-06-19 2019-06-29 2019-07-23 2019-07-20 2019-08-28 2019-08-20 2019-11-03 2020-11-12 women's participation in the Based Selection opportunities in trade for Cut Fower sector of women Bangladesh BRCP/MOC/SD-18 / Design Component 2: Enhance trade and implement training sector coordination and program for increasing Quality And Cost- IDA / 60020 economic empowerment and Post Open - National 493,670.00 357,892.58 Signed 2018-11-28 2018-12-27 2018-12-05 2019-01-01 2019-01-18 2019-05-14 2019-02-15 2019-06-19 2019-03-17 2019-07-23 2019-04-07 2019-08-28 2019-05-08 2019-12-22 2020-07-31 women's participation in the Based Selection opportunities in trade for Agro Processing sector of women Bangladesh Component 2: Enhance trade BRCP/MOC/SD-11 / Baseline sector coordination and Quality And Cost- Under survey for BRCP-1 (MOC, BLPA IDA / 60020 economic empowerment and Post Open - National 126,582.00 0.00 2018-11-29 2019-03-24 2018-12-13 2019-01-26 2019-07-21 2019-02-23 2019-03-25 2019-04-11 2019-05-12 2020-02-06 Based Selection Implementation & NBR Component) opportunities in trade for women Component 2: Enhance trade BRCP/MOC/SD-08 / Sectoral sector coordination and Diagnostics for Argo- Quality And Cost- Under IDA / 60020 economic empowerment and Post Open - National 189,873.00 0.00 2018-11-28 2019-03-24 2018-12-19 2019-02-01 2019-07-21 2019-03-01 2019-03-31 2019-05-05 2019-06-09 2020-06-08 processing sector of Based Selection Implementation opportunities in trade for Bangladesh women Component 2: Enhance trade BRCP/MOC/SD-07 / sector coordination and Conducting 03 Nos. of Quality And Cost- Pending IDA / 60020 economic empowerment and Post Open - National 56,962.00 0.00 2020-08-18 2020-09-08 2020-10-22 2020-11-19 2020-12-19 2021-01-23 2021-02-27 2021-08-26 Surveys/studies suggested by Based Selection Implementation opportunities in trade for NTTFC women Component 2: Enhance trade BRCP/MOC/SD-09 / Sectoral sector coordination and Quality And Cost- Pending Diagnostics for Cart Flower IDA / 60020 economic empowerment and Post Open - National 126,582.00 0.00 2019-09-01 2019-09-22 2019-11-05 2019-12-03 2020-01-02 2020-02-06 2020-03-12 2021-03-12 Based Selection Implementation sector of Bangladesh opportunities in trade for women Component 2: Enhance trade BRCP/MOC/SD-10 / Sectoral sector coordination and Quality And Cost- Pending Diagnostics for ICT sector of IDA / 60020 economic empowerment and Post Open - National 158,228.00 0.00 2019-09-01 2019-09-22 2019-11-05 2019-12-03 2020-01-02 2020-02-06 2020-03-12 2021-03-12 Based Selection Implementation Bangladesh opportunities in trade for women Component 1: Invest in BRCP/MOC/SD-26 / Review infrastructure, systems and of Rules & Regulation procedures to modernize key Fixed Budget Under IDA / 60020 Post Open - National 433,735.00 0.00 2019-08-18 2019-09-09 2019-08-28 2019-10-11 2019-11-08 2019-12-08 2020-01-12 2020-02-16 2021-02-15 including policy paper selected land ports essential Selection Implementation preparation for trade wit h India, Bhutan and Nepal Component 2: Enhance trade sector coordination and BRCP/MOC/SD-25 / Internal Fixed Budget Under IDA / 60020 economic empowerment and Post Open - National 24,097.00 0.00 2019-09-05 2019-08-14 2019-09-15 2019-10-29 2019-11-26 2019-12-26 2020-01-12 2020-02-16 2021-02-15 Audit-1 of BRCP-1, MOC Selection Implementation opportunities in trade for women BRCP/MOC/SD-23 / Component 2: Enhance trade Establishment of web based sector coordination and Consultant National Enquiry Point for Pending IDA / 60020 economic empowerment and Post Qualification Open - National 50,632.00 0.00 2020-08-20 2020-08-30 2020-10-13 2020-11-12 2020-12-17 2021-06-15 trade including upgradation Implementation opportunities in trade for Selection and mobile apps development women for BTP Component 2: Enhance trade BRCP/MOC/SD-22 / sector coordination and Consultant Pending Development Women Traders IDA / 60020 economic empowerment and Post Qualification Open - National 164,556.96 0.00 2019-07-22 2019-08-01 2019-09-28 2019-10-28 2019-12-02 2020-12-01 Implementation Network and Database opportunities in trade for Selection women BRCP/MOC/SD-21 / Design Component 2: Enhance trade and implement training sector coordination and program on trade facilitation Quality And Cost- Under IDA / 60020 economic empowerment and Post Open - National 493,670.00 0.00 2019-10-03 2021-06-10 2019-10-20 2021-06-20 2019-12-03 2019-12-31 2020-01-30 2020-02-20 2020-03-22 2021-06-15 for women traders including Based Selection Implementation opportunities in trade for regulatory regime and women procedural aspect of trade BRCP/MOC/SD-20 / Design Component 2: Enhance trade and implement training sector coordination and Quality And Cost- Pending program for increasing IDA / 60020 economic empowerment and Post Open - National 493,670.00 0.00 2019-10-10 2019-10-20 2019-12-03 2019-12-31 2020-01-30 2020-02-20 2020-03-22 2021-06-15 Based Selection Implementation women's participation in the opportunities in trade for ICT sector of Bangladesh women Component 2: Enhance trade BRCP/MOC/SD-02 / sector coordination and Conducting 04 Nos. of Quality And Cost- IDA / 60020 economic empowerment and Post Open - National 75,950.00 0.00 Canceled 2019-09-22 2019-09-28 2019-11-11 2019-12-09 2020-01-08 2020-01-29 2020-03-04 2020-08-31 Surveys/studies suggested by Based Selection opportunities in trade for NTTFC women Component 2: Enhance trade BRCP/MOC/SD-02/ NEW / sector coordination and Quality Based Conducting 4 Nos Studies IDA / 60020 economic empowerment and Post Open - National 95,238.00 0.00 Canceled 2021-09-03 2022-03-02 Selection suggested by NTTFC opportunities in trade for women Component 2: Enhance trade BRCP/MOC/SD-02- NEW / sector coordination and Quality Based Under Conducting 4 Studies IDA / 60020 economic empowerment and Post Open - National 95,238.00 0.00 2021-06-20 2021-06-16 2021-07-11 2021-08-24 2021-09-21 2021-10-21 2021-11-20 2021-12-25 2022-06-23 Selection Implementation suggested by NTFC opportunities in trade for women Page 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Enhance trade sector coordination and Individual SD4 / Selection of IDA / 60020 economic empowerment and Post Consultant Open 172,152.00 107,405.01 Signed 2018-01-04 2018-01-18 2018-03-08 2018-04-22 2018-03-29 2018-05-06 2018-05-03 2018-06-27 2021-05-02 Procurement Specialist opportunities in trade for Selection women Component 2: Enhance trade sector coordination and Individual SD5 / Project Manager IDA / 60020 economic empowerment and Post Consultant Open 250,000.00 150,367.01 Signed 2018-01-11 2018-01-18 2018-03-06 2018-03-16 2018-05-28 2018-04-11 2018-06-26 2021-12-31 opportunities in trade for Selection women Component 2: Enhance trade sector coordination and Individual SD6 / Financial Management IDA / 60020 economic empowerment and Post Consultant Open 100,000.00 68,225.50 Signed 2018-01-11 2018-01-18 2018-03-06 2018-04-22 2018-03-16 2018-05-28 2018-04-11 2018-06-03 2021-12-31 Expert (Junior Consultant) opportunities in trade for Selection women Component 2: Enhance trade sector coordination and Individual BRCP/MOC/SD-12 / Gender IDA / 60020 economic empowerment and Post Consultant Open 37,974.00 35,404.50 Signed 2019-01-10 2019-07-31 2019-02-28 2020-05-10 2019-03-21 2020-06-18 2019-04-25 2020-06-24 2021-12-30 Specialist opportunities in trade for Selection women Component 2: Enhance trade sector coordination and Individual BRCP/MOC/SD-13 / National IDA / 60020 economic empowerment and Post Consultant Open 153,797.00 0.00 Canceled 2019-01-10 2019-01-17 2019-02-28 2019-03-21 2019-04-25 2021-12-30 Trade Expert opportunities in trade for Selection women Component 2: Enhance trade sector coordination and Individual BRCP/MOC/SD-14 / Data IDA / 60020 economic empowerment and Post Consultant Open 79,747.00 0.00 Canceled 2019-01-10 2019-01-17 2019-02-28 2019-03-21 2019-04-25 2021-12-30 Entry Consultant opportunities in trade for Selection women Component 2: Enhance trade sector coordination and Individual BRCP/MOC/SD-15 / Focal IDA / 60020 economic empowerment and Post Consultant Open 79,747.00 0.00 Canceled 2019-01-10 2019-01-17 2019-02-28 2019-03-21 2019-04-25 2021-12-30 Person Coordinator opportunities in trade for Selection women Component 2: Enhance trade sector coordination and Individual BRCP/MOC/SD-4/1 / IDA / 60020 economic empowerment and Post Consultant Open 131,722.00 102,964.67 Signed 2019-01-22 2019-01-24 2019-02-22 2019-03-27 2019-03-08 2019-07-14 2019-03-29 2019-05-02 2021-08-15 Procurement Specialist opportunities in trade for Selection women Component 2: Enhance trade BRCP/MOC/SD-17 / National sector coordination and Individual Under Legal Expert for Regulatory IDA / 60020 economic empowerment and Post Consultant Limited 4,874.00 0.00 2020-09-10 2021-06-09 2020-09-24 2021-06-16 2020-10-15 2020-11-19 2022-11-19 Implementation Review of BTP opportunities in trade for Selection women Component 2: Enhance trade BRCP/MOC/SD-16 / sector coordination and Individual Pending International Legal Expert for IDA / 60020 economic empowerment and Post Consultant Limited 25,316.00 0.00 2020-09-10 2020-09-24 2020-10-15 2020-11-19 2022-11-19 Implementation Regulatory Review for BTP opportunities in trade for Selection women Component 1: Invest in infrastructure, systems and Individual BRCP/MOV/SD13/1 / procedures to modernize key Under IDA / 60020 Post Consultant Open 140,964.00 0.00 2019-07-31 2019-08-14 2019-09-23 2019-10-14 2019-11-18 2021-11-07 National Trade Expert selected land ports essential Implementation Selection for trade wit h India, Bhutan and Nepal Component 1: Invest in infrastructure, systems and Individual BRCP/MOC/SD14/1 / Data procedures to modernize key IDA / 60020 Post Consultant Open 92,169.00 72,174.08 Signed 2019-07-31 2019-01-17 2019-09-23 2019-11-04 2019-10-14 2019-11-25 2019-11-18 2020-01-07 2021-11-07 Management Consultant selected land ports essential Selection for trade wit h India, Bhutan and Nepal Component 1: Invest in infrastructure, systems and Individual BRCP/MOC/SD15/1 / Focal procedures to modernize key Under IDA / 60020 Post Consultant Open 70,482.00 0.00 2019-07-31 2019-08-14 2019-09-23 2019-10-14 2019-11-18 2021-11-07 Person Coordinator selected land ports essential Implementation Selection for trade wit h India, Bhutan and Nepal Component 2: Enhance trade sector coordination and Individual BRCP/MOC/SD-4/2 / Under IDA / 60020 economic empowerment and Prior Consultant Open 51,687.00 0.00 2021-06-07 2021-06-07 2021-07-11 2021-07-26 2021-08-23 2022-09-17 Procurement Specialist Implementation opportunities in trade for Selection women Page 3 PROCUREMENT PLAN (Textual Part) Project information: Comoros Inter-island Connectivity Project P173114 Project Implementation agency: Ministry of Maritime and Air Transport Date of the Procurement Plan: September 8, 2020 Period covered by this Procurement Plan: November 23, 2020 – March 31, 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Loi No11-027 du 29 Décembre 2011, portant passation de marchés publics et délégation des services public, promulguée par le Décret No12-027/PR du 04 Février 2012, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not applicable Works: Not applicable Other Relevant Procurement Information. PROCUREMENT Comoros : Comoros Inter-island Connectivity Project PLAN General Information Country: Comoros Bank’s Approval Date of the Original Procurement Plan: 2020-11-23 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173114 GPN Date: Project Name: Comoros Inter-island Connectivity Project Loan / Credit No: IDA / V3530 Comoros Inter Islands Connectivity Project Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-PICMC-232713-CW-RFQ Other (with Under / Travaux de réhabilitation du Implementation Support and Request for Single Stage - One 2022-01- IDA / V3530 Post Limited field for 0.00 Implementat 2021-05-15 2021-05-10 2021-07-10 bâtiment devant abriter l'unité Capacity Building Quotations Envelope 06 explanation) ion de gestion du projet PICMC GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-PICMC-208592-GO-RFQ Improvement of Capacity and / Acquisition de matériels Request for Single Stage - One IDA / V3530 Resilience of Port Post Limited 56,721.06 Signed 2021-02-27 2021-03-08 2021-04-24 2021-04-07 2021-05-25 informatiques et accessoires Quotations Envelope Infrastructure pour le Projet KM-PICMC-208602-GO-DIR Improvement of Capacity and / Acquisition installation et IDA / V3530 Resilience of Port Post Direct Selection Direct 24,605.63 Signed 2021-02-10 2021-05-20 2021-02-15 2021-05-24 2021-03-22 2021-06-14 2021-05-21 formation du logiciel TOM² Infrastructure PRO (V2) KM-PICMC-208605-GO-RFQ Improvement of Capacity and Request for Single Stage - One / Acquisition de mobilier de IDA / V3530 Resilience of Port Post Limited 9,034.38 Signed 2021-01-26 2021-03-10 2021-03-23 2021-04-12 2021-05-24 Quotations Envelope bureau pour le Projet Infrastructure NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-PICMC-207592-CS-QCBS Improvement of Capacity and / Etudes de conception Quality And Cost- Under IDA / V3530 Resilience of Port Post Open - International 0.00 2021-01-08 2021-03-18 2021-01-29 2021-04-07 2021-03-14 2021-06-18 2021-04-23 2021-05-23 2021-06-27 2021-08-01 2021-11-01 détaillée de projet (Fomboni, Based Selection Implementation Infrastructure ports secandaires) KM-PICMC-220667-CS-QCBS / Le recrutement d'un consultant pour préparer des études de sauvegarde Improvement of Capacity and environnementale et sociale Quality And Cost- Under IDA / V3530 Resilience of Port Post Open - International 0.00 2021-02-23 2021-03-16 2021-03-16 2021-03-23 2021-04-29 2021-06-15 2021-05-27 2021-06-26 2021-07-31 2021-09-04 2022-09-04 incluant les Termes de Based Selection Implementation Infrastructure référence de (PEES), 4 (EIES), GES du programme de renouvellement des navires, (PGMO), VBG et PMPP KM-PICMC-221940-CS-QCBS / Le recrutement d'un Improvement of Capacity and Quality And Cost- Under Consultant (Bureau d'Etude) IDA / V3530 Resilience of Port Post Open - International 0.00 2021-02-26 2021-03-02 2021-03-19 2021-03-23 2021-05-02 2021-05-30 2021-06-29 2021-08-03 2021-09-07 2022-09-07 Based Selection Implementation pour l’élaboration de Plans Infrastructure d'Action de Réinstallation KM-PICMC-228050-CS-QCBS / Recrutement d’un spécialiste pour le suivi et la supervision des activités Improvement of Capacity and relatives à la protection contre Quality And Cost- IDA / V3530 Resilience of Port Post Open - International 0.00 Under Review 2021-04-12 2021-04-12 2021-05-03 2021-06-16 2021-07-14 2021-08-13 2021-09-17 2021-10-22 2022-10-22 les Violences Basées sur le Based Selection Infrastructure Genre, l'Exploitation et les Abus Sexuels (EAS) et la protection contre le Harcèlement Sexuel (HS) au sein de l’Unité KM-PICMC-237339-CS-QCBS / Consultant pour préparer des études de sauvegarde environnementale et sociale Improvement of Capacity and Quality And Cost- Under incluant les Termes de IDA / V3530 Resilience of Port Post Open - International 0.00 2021-03-16 2021-03-16 2021-04-06 2021-05-20 2021-06-17 2021-07-17 2021-08-21 2021-09-25 2022-09-25 Based Selection Implementation référence de (PEES), 4 (EIES), Infrastructure GES du programme de renouvellement des navires, (PGMO), VBG et PMPP KM-PICMC-237338-CS-QCBS / Recrutement d'un Improvement of Capacity and Quality And Cost- Under Consultant (Bureau d'Etude) IDA / V3530 Resilience of Port Post Open - International 0.00 2021-03-02 2021-03-02 2021-03-23 2021-05-06 2021-06-03 2021-07-03 2021-08-07 2021-09-11 2022-09-11 Based Selection Implementation pour l’élaboration de Plans Infrastructure d'Action de Réinstallation INDIVIDUAL CONSULTANTS Page 1 Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-PICMC-205489-CS-INDV Improvement of Capacity and Individual / Recrutement d'un Spécialiste IDA / V3530 Resilience of Port Post Consultant Open 20,000.00 Signed 2020-11-30 2020-11-24 2021-01-03 2021-02-12 2021-01-24 2021-02-13 2021-02-22 2021-02-27 2021-08-21 en Transport et Port Infrastructure Selection KM-PICMC-205506-CS-INDV Improvement of Capacity and Individual / Recrutement d'un Spécialiste Under IDA / V3530 Resilience of Port Post Consultant Open 30,000.00 2020-12-04 2020-11-28 2021-01-13 2021-02-12 2021-01-28 2021-02-16 2021-02-26 2021-08-25 en sauvegarde Implementation Infrastructure Selection environnementale KM-PICMC-205507-CS-INDV Improvement of Capacity and Individual / Recrutement d'un Spécialiste IDA / V3530 Resilience of Port Post Consultant Open 20,000.00 Signed 2020-12-04 2020-12-03 2021-01-13 2021-02-12 2021-01-29 2021-02-16 2021-02-26 2021-03-01 2021-08-25 en sauvegarde sociale Infrastructure Selection KM-PICMC-205512-CS-INDV / Recrutement d’un(e) d’un Improvement of Capacity and Individual spécialiste en passations des IDA / V3530 Resilience of Port Post Consultant Open 11,742.24 Signed 2020-12-10 2020-11-24 2021-01-19 2021-02-27 2021-02-03 2021-02-27 2021-03-03 2021-03-01 2021-08-30 marchés pour les études Infrastructure Selection préparatoires du projet KM-PICMC-205518-CS-INDV Improvement of Capacity and Individual / Recrutement d'un IDA / V3530 Resilience of Port Post Consultant Open 20,000.00 Signed 2020-12-10 2020-11-28 2021-01-19 2021-02-12 2021-02-03 2021-02-13 2021-03-04 2021-02-27 2021-08-31 Responsable Administratif et Infrastructure Selection Financier du Projet KM-PICMC-207595-CS-INDV Improvement of Capacity and Individual Under / Recrutement d'un Expert en IDA / V3530 Resilience of Port Post Consultant Open 0.00 2021-02-19 2021-04-09 2021-04-30 2021-06-04 2021-12-01 Implementation Transport maritime (Navire) Infrastructure Selection KM-PICMC-207597-CS-INDV Improvement of Capacity and Individual Under / Recrutement d'un Expert en IDA / V3530 Resilience of Port Post Consultant Open 0.00 2021-02-26 2020-12-24 2021-04-16 2021-05-07 2021-06-11 2021-12-08 Implementation Infrastructure portuaire Infrastructure Selection KM-PICMC-207601-CS-INDV Improvement of Capacity and Individual Pending / Recrutement d'un Spécialiste IDA / V3530 Resilience of Port Post Consultant Open 0.00 2021-01-29 2021-03-19 2021-04-09 2021-05-14 2021-11-10 Implementation en Suivi Evaluation Infrastructure Selection KM-PICMC-209645-CS-INDV / Le recrutement d'un Improvement of Capacity and Individual Coordinateur du Projet IDA / V3530 Resilience of Port Post Consultant Limited 30,000.00 Signed 2020-12-21 2020-12-17 2020-12-26 2021-01-02 2021-01-16 2021-01-28 2021-02-20 2021-02-22 2021-08-19 Connectivité Inter-Iles aux Infrastructure Selection Comores (PICMC) KM-PICMC-224426-CS-INDV / Recrutement d'un consultant pour faire le devis, suivi et Improvement of Capacity and Individual contrôle des travaux de IDA / V3530 Resilience of Port Post Consultant Limited 4,517.19 Signed 2021-03-15 2021-03-25 2021-03-20 2021-03-31 2021-04-10 2021-04-08 2021-05-15 2021-04-12 2021-11-11 réhabilitation devant abriter Infrastructure Selection l'Unité de Gestion du projet PICMC KM-PICMC-207593-CS-INDV / Recrutement d'un Individual Consultant pour les Etudes de Pending IDA / V3530 Post Consultant Open 0.00 2021-03-31 2021-05-19 2021-06-09 2021-07-14 2021-11-13 base sur les bénéficiaires du Implementation Selection projet et définition du cadre des résultats. KM-PICMC-225353-CS-INDV Improvement of Capacity and Individual / Recrutement du gardien IDA / V3530 Resilience of Port Post Consultant Direct 2,624.30 Signed 2021-03-25 2021-03-25 2021-04-04 2021-03-31 2021-04-25 2021-04-02 2021-05-30 2021-04-02 2021-11-26 pour le bureau de l'UGP du Infrastructure Selection projet PICMC KM-PICMC-207086-CS- INDV/MANUEL / Recrutement d'un Consultant individuel Individual pour l'élaboration et la IDA / V3530 Post Consultant Open 0.00 Canceled 2021-02-26 2021-04-16 2021-05-07 2021-06-11 2021-09-09 Préparation du manuel des Selection opérations et des procédures administratives et financières. KM-PICMC-224435-CS-CDS / Consultant pour la préparation du PPSD (plan et Implementation Support and stratégie de passation du IDA / V3530 Post Direct Selection Direct 7,876.38 Signed 2021-04-12 2021-04-13 2021-04-22 2021-04-19 2021-06-26 2021-06-07 2021-12-23 Capacity Building marchés) et Plan de passation des marchés (18 premiers mois) KM-PICMC-229215-CS-INDV / Spécialiste pour le suivi et la supervision des activités relatives à la protection contre Improvement of Capacity and Individual les Violences Basées sur le Under IDA / V3530 Resilience of Port Post Consultant Open 0.00 2021-04-14 2021-04-28 2021-06-02 2021-06-23 2021-07-28 2022-01-24 Genre, l'Exploitation et les Implementation Infrastructure Selection Abus Sexuels (EAS) et la protection contre le Harcèlement Sexuel (HS) au sein de l’UGP KM-PICMC-235151-CS-INDV Individual Implementation Support and / Assistante Administrative du IDA / V3530 Post Consultant Direct 2,586.22 Signed 2021-05-21 2021-05-31 2021-05-25 2021-06-10 2021-05-26 2021-06-14 2021-05-31 2021-06-14 2021-08-30 Capacity Building projet PICMC Selection KM-PICMC-235153-CS-INDV Individual Implementation Support and / Assistant en Passation des IDA / V3530 Post Consultant Direct 3,029.58 Signed 2021-05-21 2021-05-31 2021-05-25 2021-06-11 2021-05-26 2021-06-14 2021-06-02 2021-06-15 2021-09-01 Capacity Building Marchés du projet PICMC Selection Page 2 PLAN DE PASSATION DE MARCHÉS (Partie Textuelle) Information sur le Projet : Nom du pays : République du Bénin Nom du Projet : PROJET DE GESTION DES EAUX PLUVIALES ET DE RÉSILIENCE URBAINE (PAPC) No d’identification du projet : P 167359 Agence d’exécution du Projet : Agence du cadre de vie pour le développement du territoire (ACVDT) Date du plan de passation des marchés : Novembre 2018 Période couverte par ce plan de passation des marchés : Novembre 2018 au Juin 2019 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016 révisé en Novembre 2017 et Août 2018) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, au cas où la procédure de passation des marché est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Travaux [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Autres informations pertinentes sur la passation des marchés « Sans objet » PROCUREMENT Benin : Benin - Stormwater Management and Urban Resilience Project PLAN General Information Country: Benin Bank’s Approval Date of the Original Procurement Plan: 2019-04-08 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167359 GPN Date: 2020-07-26 Project Name: Benin - Stormwater Management and Urban Resilience Project Loan / Credit No: IDA / 64300 B Executing Agency(ies): ENIN STORMWATER MANAGEMENT AND URBAN RESILIENCE PROJECT WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BJ-PAPC-167654-CW-RFB / Component 1: Stormwater Travaux de construction des drainage investment and Under collecteurs d'assainissement Single Stage - One 34,306,275.0 2023-02- IDA / 64300 community engagement for Prior Request for Bids Open - International 0.00 Implementat 2020-06-18 2020-12-29 2020-07-30 2021-03-02 2020-09-13 2021-03-18 2020-10-13 2020-11-23 pluvial et aménagement des Envelope 0 23 flood risk reduction and ion voies connexes dans les climate change adaptatio n bassins Pa3 et Y BJ-PAPC-167657-CW-RFB / Component 1: Stormwater Travaux de mise en œuvre des drainage investment and Single Stage - One 2022-02- aménagements connexes IDA / 64300 community engagement for Post Request for Bids Open - National 600,000.00 0.00 Canceled 2020-06-15 2020-07-30 2020-09-10 2020-10-10 2020-11-20 Envelope 21 dans les zones non flood risk reduction and aedificandi climate change adaptatio n GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-PAPC-167661-GO-RFQ / Acquisition d’équipement informatique et autres matériels(9 ordinateurs Component 3: Project Under portables; 5 imprimantes tout Request for Single Stage - One IDA / 64300 management, monitoring and Post Limited 90,956.00 181,912.00 Implementati 2020-06-30 2020-12-02 2020-08-25 2021-02-21 en un, ; 6 destructeurs de Quotations Envelope evaluation on papier; 1 photocopieur multifonction, 1 video projecteur, et d'autres materiels BJ-PAPC-167664-GO-RFQ / Component 3: Project Under Request for Single Stage - One Acquisition et installation d'un IDA / 64300 management, monitoring and Post Limited 34,247.00 34,247.00 Implementati 2020-06-15 2021-02-24 2020-08-11 2020-11-09 Quotations Envelope serveur et câblage réseau evaluation on BJ-PAPC-167745-GO-RFQ / Acquisition de fournitures de bureaux et consommables Component 3: Project informatiques ( rames de Request for Single Stage - One IDA / 64300 management, monitoring and Post Limited 85,616.00 85,616.00 Signed 2020-06-30 2021-03-01 2020-08-31 2021-05-31 2020-10-01 papier, cartouche d’encre ; Quotations Envelope evaluation encres pour copieurs et imprimantes ) pour le Pool PAPC BJ-PAPC-126837-GO-RFQ / Acquisition de mobiliers de bureau : 10 (Tables + retour+ caisson ) ; 9 fauteuils Component 3: Project directeurs; 19 chaises Request for Single Stage - One IDA / 64300 management, monitoring and Post Open - National 61,644.00 61,644.00 Signed 2019-09-07 2019-10-19 2021-02-10 2020-04-16 visiteurs ; 1tables circulaire à Quotations Envelope evaluation 6 places + 6 chaises; 1 table de conférence de 30 places + 30 chaises; 4 armoires meta de range; au profit de PAPC BJ-PAPC-126838-GO-RFQ / Acquisition de deux véhicules Component 3: Project Request for Single Stage - One pour le fonctionnement du IDA / 64300 management, monitoring and Post Open - National 128,425.00 0.00 Canceled 2019-09-07 2019-11-02 2019-11-17 Quotations Envelope Pool PAPC (1 pick-up et 1 evaluation véhicule 2x4) BJ-PAPC-206754-GO-UN / Acquisition de deux véhicules Component 3: Project Under UN Agencies pour le fonctionnement du IDA / 64300 management, monitoring and Post Direct 128,425.00 0.00 Implementati 2020-11-27 2021-03-30 2020-12-02 2021-04-22 2021-01-06 2021-07-05 (Direct) Pool PAPC (1 pick-up et 1 evaluation on véhicule 2x4) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-PAPC-172285-NC-RFQ / Component 3: Project Acquisition d'un logiciel de Request for Single Stage - One IDA / 64300 management, monitoring and Post Limited 17,123.00 0.00 Canceled 2020-10-31 2021-01-01 2021-06-30 Suivi & Évaluation et Quotations Envelope evaluation formation des utilisateurs BJ-PAPC-167787-GO-RFQ / Recrutement d'une agence Component 3: Project Request for Single Stage - One événementielle pour le IDA / 64300 management, monitoring and Post Limited 8,562.00 0.00 Canceled 2020-06-13 2020-08-08 2020-08-23 Quotations Envelope lancement technique du evaluation projet PAPC CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 BJ-PAPC-96830-CS-CQS / Component 3: Project Consultant Recrutement d'un cabinet IDA / 64300 management, monitoring and Post Qualification Limited 10,400.00 9,970.62 Completed 2019-01-28 2018-11-22 2019-02-11 2018-11-22 2019-03-13 2019-01-16 2019-04-17 2019-01-24 2019-10-14 2019-05-01 pour la sélection des evaluation Selection membres de l'UGP du PAPC BJ-PAPC-189945-CS-QCBS / Component 1: Stormwater Recrutement d'un cabinet drainage investment and chargé de la mission de Quality And Cost- Under IDA / 64300 community engagement for Prior Open - International 1,500,000.00 0.00 2020-08-23 2020-10-16 2020-09-13 2020-10-24 2020-10-27 2021-05-03 2020-11-24 2021-06-18 2020-12-24 2021-01-28 2021-03-04 2022-11-21 surveillance et contrôle Based Selection Implementation flood risk reduction and général: sélection du Maitre climate change adaptatio n d'oeuvre BJ-PAPC-167996-CS-QCBS / Component 1: Stormwater Recrutement d'un cabinet drainage investment and Quality And Cost- chargé de la mission de IDA / 64300 community engagement for Prior Open - International 2,395,690.00 0.00 Canceled 2020-06-05 2020-07-25 2020-06-26 2020-08-09 2020-09-08 2020-10-08 2020-11-12 2020-12-21 2021-12-21 Based Selection surveillance et contrôle flood risk reduction and général climate change adaptatio n BJ-PAPC-170658-CS-LCS / Sélection d'un Consultant pour la réalisation de l’étude d'Impact Environnementale et Component 1: Stormwater Sociale, du Plan d'Action de drainage investment and Consultant Réinstallation des rues IDA / 64300 community engagement for Post Qualification Open - National 128,420.00 0.00 Canceled 2020-06-02 2020-06-23 2020-08-06 2020-09-05 2020-10-10 2021-04-08 complémentaire et flood risk reduction and Selection actualisation des Plans climate change adaptatio n d'Action de Réinstallation existants, dans les bassins Pa3 et Y BJ-PAPC-168002-CS-QCBS / Sélection d'un cabinet pour Développer et opérationaliser un Système d'Information Géographique pour la gestion Component 2: Strengthening Quality And Cost- des eaux pluviales et la IDA / 64300 urban resilience management Post Open - National 86,207.00 0.00 Canceled 2020-07-10 2020-07-25 2020-08-25 2020-09-22 2020-10-12 2020-11-13 2020-12-18 2021-02-16 Based Selection résilience urbaine à l'échelle and capacity de la ville de Cotonou (Plateforme d'échange et de partage de données pour le suivi e BJ-PAPC-167994-CS-CQS / Sélection d'un cabinet pour développer un modèle hydrologique pour la Component 2: Strengthening Consultant production de cartes d’aléas IDA / 64300 urban resilience management Post Qualification Limited 86,207.00 0.00 Canceled 2020-12-15 2021-02-13 des inondations et and capacity Selection renforcement des capacités des acteurs pour son fonctionnement BJ-PAPC-167991-CS-CQS / Recrutement d'un cabinet pour développer le plan Component 2: Strengthening Consultant multisectorielle de IDA / 64300 urban resilience management Post Qualification Limited 86,207.00 0.00 Canceled 2020-10-15 2020-10-07 2020-10-29 2020-11-28 2021-01-02 2021-03-03 renforcement de capacité et and capacity Selection sa mise en œuvre (Identifier et chiffrer les besoins en renforcement de capacité) BJ-PAPC-228558-CS-QCBS / Recrutement d'une ONG en Component 1: Stormwater charge du développement et drainage investment and de la mise en œuvre de la Quality And Cost- Under IDA / 64300 community engagement for Post Open - National 123,287.67 0.00 2021-05-10 2021-06-13 2021-05-31 2021-07-14 2021-08-11 2021-09-10 2021-10-15 2021-11-19 2022-11-19 stratégie de facilitation sociale Based Selection Implementation flood risk reduction and pour l’engagement climate change adaptatio n communautaire dans sa globalité y compris le plan IEC BJ-PAPC-233044-CS-LCS / Component 3: Project Recrutement d'un cabinet Least Cost Under IDA / 64300 management, monitoring and Post Open - National 180,000.00 0.00 2021-05-14 2021-05-27 2021-06-04 2021-07-18 2021-08-15 2021-09-14 2021-10-19 2021-11-23 2022-05-22 pour réaliser l'audit financier Selection Implementation evaluation au titre de l'année 2020 BJ-PAPC-167997-CS-QCBS / Recrutement d'une ONG en Component 1: Stormwater charge du développement et drainage investment and de la mise en œuvre de la Quality And Cost- IDA / 64300 community engagement for Post Open - National 517,242.00 0.00 Canceled 2020-12-14 2020-12-15 2021-01-04 2021-02-17 2021-03-17 2021-04-16 2021-05-21 2021-06-25 2022-06-25 stratégie de facilitation sociale Based Selection flood risk reduction and pour l’engagement climate change adaptatio n communautaire dans sa globalité y compris le plan IEC BJ-PAPC-117773-CS-CQS / Recrutement d'un consultant Component 3: Project Consultant pour l'élaboration du manuel IDA / 64300 management, monitoring and Post Qualification Limited 25,000.00 0.00 Canceled 2019-06-06 2019-08-07 2019-06-16 2019-11-08 2019-06-21 2019-07-01 2019-08-30 de procédure administrative evaluation Selection et financière et du manuel d'exécution du projet BJ-PAPC-170660-CS-CQS / Recrutement d'un cabinet Component 3: Project Consultant pour la mise en place d'une IDA / 64300 management, monitoring and Post Qualification Limited 51,370.00 0.00 Canceled 2020-10-20 2020-11-03 2020-12-03 2021-01-13 2022-01-13 plateforme électronique de evaluation Selection gestion des plaintes BJ-PAPC-234538-CS-CQS / Recrutement d'un cabinet Component 3: Project Consultant Under pour développer un logiciel de IDA / 64300 management, monitoring and Post Qualification Open - National 89,281.00 0.00 2021-06-01 2021-05-28 2021-06-22 2021-08-05 2021-09-04 2021-10-09 2022-04-07 Implementation suivi évaluation et former le evaluation Selection personnel dédié au PAPC BJ-PAPC-186661-CS-NPO / Recrutement d'une ONG pour l'appui à la mise en oeuvre Component 1: Stormwater des Plans d'Action de drainage investment and Quality Based Réinstallation (PAR) des IDA / 64300 community engagement for Post Open - National 21,216.00 0.00 Canceled 2020-10-15 2020-11-27 2020-11-05 2020-12-19 2021-01-16 2021-02-15 2021-03-17 2021-04-21 2022-04-21 Selection travaux d'assainissement flood risk reduction and pluvial et d'aménagement de climate change adaptatio n rues dans les bassins AAc, Y et Pa3 la ville de Cotonou Page 2 BJ-PAPC-206814-CS-QCBS / Sélection d'un firme pour développer et opérationnaliser un SIG pour la gestion des Component 2: Strengthening eaux pluviales et la résilience Quality And Cost- Pending IDA / 64300 urban resilience management Post Open - National 172,414.00 0.00 2021-06-09 2021-06-30 2021-08-13 2021-09-10 2021-10-10 2021-11-14 2021-12-19 2022-07-30 urbaine à l'échelle de Cotonou Based Selection Implementation and capacity et d’un modèle hydrologique pour production de cartes d’aléas des inondations et renforcement des capacités INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Stormwater drainage investment and Individual BJ-PAPC-139127-CS-INDV / Pending IDA / 64300 community engagement for Post Consultant Open 210,000.00 0.00 2019-10-11 2019-11-29 2019-12-20 2020-01-24 2020-07-22 Sélection Coordonnateur Implementation flood risk reduction and Selection climate change adaptatio n Component 1: Stormwater BJ-PAPC-139148-CS-INDV / drainage investment and Individual Pending Sélection Expert Suivi IDA / 64300 community engagement for Post Consultant Open 135,000.00 0.00 2019-10-11 2019-11-29 2019-12-20 2020-01-24 2020-07-22 Implementation Évaluation flood risk reduction and Selection climate change adaptatio n Component 1: Stormwater drainage investment and Individual BJ-PAPC-139161-CS-INDV / Pending IDA / 64300 community engagement for Post Consultant Open 135,000.00 0.00 2019-10-11 2019-11-29 2019-12-20 2020-01-24 2020-07-22 Sélection Chef Comptable Implementation flood risk reduction and Selection climate change adaptatio n Component 1: Stormwater BJ-PAPC-139162-CS-INDV / drainage investment and Individual Pending Sélection Expert Passation IDA / 64300 community engagement for Post Consultant Open 135,000.00 0.00 2019-10-11 2019-11-29 2019-12-20 2020-01-24 2020-07-22 Implementation Marchés flood risk reduction and Selection climate change adaptatio n Component 1: Stormwater BJ-PAPC-139165-CS-INDV / drainage investment and Individual Sélection Expert Sauvegarde IDA / 64300 community engagement for Post Consultant Open 135,000.00 0.00 Canceled 2019-10-11 2018-11-26 2019-11-29 2019-12-20 2020-01-24 2020-07-22 Envrionementale flood risk reduction and Selection climate change adaptatio n Component 1: Stormwater BJ-PAPC-139167-CS-INDV / drainage investment and Individual Sélection Expert en IDA / 64300 community engagement for Post Consultant Open 135,000.00 0.00 Canceled 2019-10-11 2019-02-25 2019-11-29 2019-12-20 2020-01-24 2020-07-22 sauvegarde sociale flood risk reduction and Selection climate change adaptatio n Component 1: Stormwater BJ-PAPC-139168-CS-INDV / drainage investment and Individual Under Sélection Expert en facilitation IDA / 64300 community engagement for Post Consultant Open 135,000.00 0.00 2019-10-11 2019-10-30 2019-11-29 2019-12-20 2020-01-24 2020-07-22 Implementation sociale flood risk reduction and Selection climate change adaptatio n Component 1: Stormwater drainage investment and Individual BJ-PAPC-139169-CS-INDV / Under IDA / 64300 community engagement for Post Consultant Open 170,400.00 0.00 2019-10-11 2019-10-15 2019-11-29 2019-12-20 2020-01-24 2020-07-22 Sélection Expert Hydraulicien Implementation flood risk reduction and Selection climate change adaptatio n Component 3: Project Individual BJ-PAPC-159363-CS-INDV / Under IDA / 64300 management, monitoring and Post Consultant Open 180,000.00 0.00 2020-02-14 2020-02-19 2020-02-28 2020-03-04 2020-03-14 2020-03-19 Expert en sauvegarde sociale Implementation evaluation Selection BJ-PAPC-159583-CS-INDV / Component 3: Project Individual Under Expert en sauvegarde IDA / 64300 management, monitoring and Post Consultant Open 180,000.00 0.00 2020-02-14 2020-02-19 2020-02-28 2020-03-04 2020-03-14 2020-03-19 Implementation environnementale evaluation Selection BJ-PAPC-189667-CS-INDV / Recrutement d’un Consultant individuel pour la réalisation Component 3: Project Individual Under de l'étude d'Impact IDA / 64300 management, monitoring and Post Consultant Limited 26,200.00 0.00 2020-10-15 2020-11-03 2020-10-20 2020-11-10 2020-12-16 2021-02-21 Implementation Environnemental et Social des evaluation Selection rues complémentaires dans les bassins AAc et Pa3 BJ-PAPC-202809-CS-INDV / Sélection d'un consultant Component 1: Stormwater individuel pour la réalisation drainage investment and Individual Under des plans d'action, de IDA / 64300 community engagement for Post Consultant Limited 47,700.00 0.00 2020-12-01 2020-12-16 2020-12-06 2020-12-27 2021-01-31 2021-07-30 Implementation réinstallation des rues flood risk reduction and Selection complémentaires dans les climate change adaptatio n bassins AAc et Pa3 BJ-PAPC-206776-CS-INDV / Recrutement d'un consultant Component 3: Project Individual individuel pour la mise en Under IDA / 64300 management, monitoring and Post Consultant Limited 51,370.00 0.00 2020-11-26 2020-12-13 2020-12-07 2020-12-28 2021-02-01 2021-07-31 place d'une plateforme Implementation evaluation Selection électronique de gestion des plaintes BJ-PAPC-210206-CS-INDV / Component 3: Project Individual Recrutement d'un (e) Chef Under IDA / 64300 management, monitoring and Post Consultant Open 135,000.00 0.00 2020-12-21 2020-12-28 2021-02-08 2021-03-01 2021-04-05 2021-10-02 Comptable au profit du Pool Implementation evaluation Selection PAPC BJ-PAPC-168003-CS-INDV / Recrutement d'un consultant individuel pour la mise en Component 3: Project Individual place des outils de Suivi- IDA / 64300 management, monitoring and Post Consultant Limited 17,123.00 0.00 Canceled 2020-06-22 2020-10-11 2020-07-06 2020-07-27 2020-08-31 2021-02-27 évaluation du Programme evaluation Selection (manuel de suivi-évaluation et autres outils) Page 3 BJ-PAPC-227338-CS-INDV / Recrutement d'un consultant individuel pour l'élaboration Component 2: Strengthening Individual Under du plan de renforcement de IDA / 64300 urban resilience management Post Consultant Limited 31,268.00 0.00 2021-06-07 2021-06-02 2021-06-12 2021-07-03 2021-08-07 2022-02-03 Implementation capacités consolidé du and capacity Selection Programme d'Assainissement Pluvial de Cotonou BJ-PAPC-236872-CS-CDS / Component 3: Project Under Recrutement du IDA / 64300 management, monitoring and Post Direct Selection Direct 51,198.00 51,198.00 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2022-02-17 Implementation Coordonnateur du Pool PAPC evaluation BJ-PAPC-236877-CS-CDS / Component 3: Project Under Recrutement du SPECIALISTE IDA / 64300 management, monitoring and Post Direct Selection Direct 35,467.00 34,467.00 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2022-02-17 Implementation EN SUIVI-EVALUATION / PAPC evaluation BJ-PAPC-236879-CS-CDS / Component 3: Project Recrutement de l'EXPERT EN Under IDA / 64300 management, monitoring and Post Direct Selection Direct 34,855.00 34,855.00 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2022-02-17 SAUVEGARDE Implementation evaluation ENVIRONNEMENTALE / PAPC BJ-PAPC-236891-CS-CDS / Component 3: Project Under Recrutement de l'EXPERT EN IDA / 64300 management, monitoring and Post Direct Selection Direct 34,855.00 34,855.00 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2022-02-17 Implementation FACILITATION SOCIALE / PAPC evaluation BJ-PAPC-236893-CS-CDS / Component 3: Project Under Recrutement de l'EXPERT EN IDA / 64300 management, monitoring and Post Direct Selection Direct 36,792.00 36,792.00 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2022-02-17 Implementation SAUVEGARDE SOCIALE / PAPC evaluation BJ-PAPC-236898-CS-CDS / Component 3: Project Recrutement du SPECIALISTE Under IDA / 64300 management, monitoring and Post Direct Selection Direct 35,467.00 35,467.00 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2022-02-17 EN PASSATION DES MARCHES Implementation evaluation / PAPC BJ-PAPC-236902-CS-CDS / Component 3: Project Under Recrutement de l'expert IDA / 64300 management, monitoring and Post Direct Selection Direct 36,119.00 36,119.00 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2022-02-17 Implementation HYDRAULICIEN PAPC evaluation BJ-PAPC-237488-CS-INDV / Recrutement d'un consultant Component 3: Project Individual Under individuel pour appuyer le IDA / 64300 management, monitoring and Post Consultant Open 15,582.19 0.00 2021-06-18 2021-06-13 2021-08-06 2021-08-27 2021-10-01 2022-03-30 Implementation Pool PAPC dans la passation evaluation Selection des marchés Page 4 REPUBLIQUE DE CENTRAFRIQUE Projet d’Urgence d’Accès à l’Electricité (PURACEL) P164885 « Numéro du crédit ou du Don » PLAN SIMPLIFIE DE PASSATION DES MARCHES POUR L’AVANCE DE PREPARATION DU PROJET Information sur le Projet : République Centrafricaine - Projet Énergie – P164885 Agence d’exécution du Projet : Sous – traitant Coordination du Projet de Facilitation des Transports et du Transit en zone CEMAC Date du plan de passation des marchés : 13 décembre 2017 Période couverte par ce plan de passation des marchés : Septembre 2017 à Juin 2019 I. PRÉAMBULE Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation de marché se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés pourront être utilisées. Page 1 of 9 Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées par la Loi n°08.017 portant Code des Marchés Publics et Délégations de Service Publics en République Centrafricaine, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas pour les contrats indiqués dans les tableaux du Plan de passation des marchés. Travaux ne s’applique pas pour les contrats indiqués dans les tableaux du Plan de passation des marchés. Page 2 of 9 II. TRAVAUX, FOURNITURES ET SERVICES NON INTELLECTUELS 1. Dispositions relatives aux seuils de revue préalable : Seuils requis pour les décisions de marchés soumis au contrôle de la passation des marchés, tel que prévu dans l’annexe II du "Règlement de Passation des pour les Emprunteurs sollicitant de la Banque mondiale le Financement de Projets d’Investissement (FPI)’’. Méthodes de Seuils de Examen par la Catégorie passation Option de marchés revue en Banque des marchés USD ≥ Tous les contrats Appel International 5.000.000 d’Offres < Le premier National Travaux 5.000.000 contrat Demande de Aucun Internationale/Nati cotations <200.000 onale (DC) ≥ Tous les contrats Fournitures Appel International 500.000 et services d’Offres < Le premier autres que National 500.000 contrat services de Demande de Internationale/Nati Aucun consultant <100.000 cotations onale 2. Seuils pour les méthodes de passation des marchés : Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : TRAVAUX (US$ équivalent) FOURNITURES (US$ équivalent) Demande Demande Appel d’offres de Appel d’offres de Cotations Cotations Internatio National International/Na Internatio National International/Nat nal tional nal ional < ≥ ≥ <500.00 5.000.00 < 200,000 < 100,000 5,000.000 500.000 0 0 3. Référence (s’il y en a) au Manuel d’exécution du projet/Manuel de Passation des Marchés : Manuel des Procédures Administrative, Financière et Comptable. 4. Autres arrangements spécifiques pour la passation des marchés : Concernant les acquisitions de véhicules et de carburant, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur de USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque ou distributeurs de produits pétroliers) ; Page 3 of 9 5. Autres modalités nationales de passation des marchés : En conformité avec le paragraphe 5.5 du "Règlement de Passation des pour les Emprunteurs sollicitant de la Banque mondiale le Financement de Projets d’Investissement (FPI)’’, les autres modalités nationales de passation des marchés (autres que sous forme d’appel d’offres/à propositions national ouvert) qui pourraient être appliquées par l’Emprunteur (appel d’offres restreint, demande de prix/consultation des fournisseurs, entente directe) doivent être conformes aux Principes Fondamentaux de passation des marchés de la Banque et garantir que les Directives de lutte contre la corruption, son cadre de sanctions et les recours contractuels visés dans l’Accord Juridique s’appliquent. Page 4 of 9 6. Liste des marchés avec les méthodes de passation et les dates de mise en œuvre Fournitures, Travaux et Services autres que services de consultants 1 2 3 4 5 6 7 8 9 Date Pré Revue de Comment Ré Méthode Préférenc prévue Coût qualific la Banque aires / Fin f. passatio e de Description estimatif ation (à priori / de No n des nationale l’ouvertu (US$) (oui/no à prestation . marchés (oui/non) re des n) posteriori) s offres Acquisition du matériel informatique pour assistant comptable, assistant en passation des A 1 marchés, expert suivi- 50 000 DC NON NON 10/09/17 10/02/18 posteriori évaluation et expert environnemental et social Coût total en US$ 50 000 Page 5 of 9 III. SÉLECTION DES CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable des marchés : Décisions de sélection sujet au contrôle de la passation des marchés, tel que prévu dans l’annexe II du "Règlement de Passation des pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)’’. Seuils Méthodes de de Examen par Catégorie sélection revue la Banque en USD SFQC ; SFQ ; ≥ Tous les Services de SBCD ; SMC ; CQ 200.000 contrats Consultant (firmes) ≥ Tous les SED 100.000 contrats ≥ Tous les SED Consultants 100.000 contrats Individuels Comparaison de ≥ Tous les CVs) 200.000 contrats 2. Liste restreinte composée entièrement de firmes nationales: La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 200,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du paragraphe 7.25 du "Règlement de Passation des pour les Emprunteurs sollicitant de la Banque mondiale le Financement de Projets d’Investissement (FPI)’’. 3. Autres arrangements spécifiques pour la Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; cependant, ce seuil ne devrait pas dépasser la contre-valeur de USD 300,000 sauf dans des cas exceptionnels prévus au paragraphe 7.12 du "Règlement de Passation des pour les Emprunteurs sollicitant de la Banque mondiale le Financement de Projets d’Investissement (FPI) ". Page 6 of 9 4. Liste des Consultations, avec les méthodes de sélection et le calendrier de mise œuvre 1 2 3 4 5 6 7 Revue Date de la Coût Méthod prévue de Ref Banque Commentaires estimatif e de soumissio . Description des Missions (à priori / Fin de ($EU) 1$ = sélectio n des No. /à prestations 600 FCFA n propositio posterio ns ri) Recrutement d’un Consultant/ Firme pour la Réalisation des Etudes d’Impact Environnementales et Sociales (EIES), les Plans de Gestion Environnemental et Social (PGES) 1 y compris le Plan d’Action et de 450,000 SFQC A priori 15/06/2018 30/12/2018 Réinstallation (PAR), de la Centrale Solaire de Bangui ainsi que pour le Renforcement du Réseau de Transmission et le Réseau de Distribution. Recrutement d’un consultant (firme) pour les études géologiques, topographiques et 2 75,000 SED A priori 30/07/2018 30/12/2018 hydrologiques pour le site d’implantation de la centrale solaire Recrutement d’un consultant A 3 (individuel) pour les études de 100,000 CI 30/07/2018 30/12/2018 posteriori faisabilité pour le renforcement du Page 7 of 9 1 2 3 4 5 6 7 Revue Date de la Coût Méthod prévue de Ref Banque Commentaires estimatif e de soumissio . Description des Missions (à priori / Fin de ($EU) 1$ = sélectio n des No. /à prestations 600 FCFA n propositio posterio ns ri) réseau de transmission et installation d’un système SCADA Recrutement d’un expert en passation de marchés pour appuyer la contrepartie 4 centrafricaine et la PIU pour 60,000 CI A priori 30/07/2018 30/06/2019 préparer l’appel d’offres pour le contrat de fourniture et installation de la centrale solaire Recrutement d’un consultant (firme) pour la supervision de l’exécution des travaux de construction de la centrale de 5 800,000 SFQC A priori 15/08/2018 30/06/2020 champ solaire à Bangui ainsi que l’exécution des travaux liés au renforcement du réseau de transmission Recrutement d’un Consultant individuel pour la préparation de 6 la requête de financement auprès 100,000 CI A priori 30/09/2018 30/06/2019 du Fonds Vert Climat (Green Climate Fund) Recrutement d’un Consultant pour Entente 7 50,000 CI 30/09/17 30/12/17 l’élaboration de la Stratégie de Directe Page 8 of 9 1 2 3 4 5 6 7 Revue Date de la Coût Méthod prévue de Ref Banque Commentaires estimatif e de soumissio . Description des Missions (à priori / Fin de ($EU) 1$ = sélectio n des No. /à prestations 600 FCFA n propositio posterio ns ri) Passation des marches du Projet pour promouvoir le Développement (PPSD) Recrutement d’un consultant/Firme pour le support A 8 100,000 QC 30/01/2019 30/12/2019 juridique en appui à la préparation posteriori du projet Recrutement d’une Agence A 9 Publicitaire pour une Campagne de 75,000 QC 30/09/2018 30/06/2019 posteriori sensibilisation Coût total en US$ 1,810,000 Lexique des Sigles et Abréviations AO : Appel d’Offres Ouvert SMC : Sélection au Moindre Coût DC : Demande de Cotations CI : Consultant Individuel SFQC : Sélection Fondée sur la Qualité et le Coût A posteriori : Revue à posteriori SFQ : Sélection Fondée sur la Qualité A Priori : Revue à priori QC : Sélection fondée sur les Qualifications des ED : Entente Directe Consultants PPM : Plan de Passation des Marchés Page 9 of 9 PROCUREMENT Central African Republic : CAR Emergency Electricity Supply and Access Project PLAN General Information Country: Central African Republic Bank’s Approval Date of the Original Procurement Plan: 2018-07-19 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164885 GPN Date: Project Name: CAR Emergency Electricity Supply and Access Project Loan / Credit No: IDA / V1260, IDA / D4300 Emergency Electricity Access Project Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PS/015/CW/RFB/19 / Infrastructures de transmission-Travaux de Component 2: Strengthening réhabilitation des Single Stage - One 2020-05- IDA / D4300 of the transmission and Prior Request for Bids Open - International 0.00 Canceled 2019-07-25 2019-07-30 2019-09-10 2019-10-10 2019-11-14 infrastructures de Envelope 12 distribution (T&D) networks transmission et fourniture et installation d'un système de contrôle SCADA Component 3: Institutional PS/019/CW/RFQ/19 / Bureau Under strengthening, capacity Request for Single Stage - One 2020-04- UGP-Réhabilitation de IDA / D4300 Post Limited 0.00 Implementat 2019-09-04 2019-09-05 2019-10-30 building, and project Quotations Envelope 27 bureaux pour l'UGP ion implementation support PS/014/CW/RFP/19 / Centrale solaire-Construction de la centrale solaire, et Component 1: Construction Request for 36,703,313. 2021-11- opération et maintenance IDA / D4300 of a Solar PV Electricity Prior Open - International Multi Stage Signed 2019-07-30 2019-12-17 2019-10-15 2020-01-24 2019-10-15 2020-01-24 2019-08-04 2019-12-24 2020-01-24 2020-04-06 2021-04-28 2020-05-11 2020-12-17 Proposals 46 02 pour 3 ans. Sélection Initiale Generation Plant puis Demande de Proposition en 2 étapes. PS/029/CW/DIR/19 / Component 3: Institutional Ouverture voix-Travaux strengthening, capacity 2020-03- d'ouverture d'une nouvelle IDA / D4300 Post Direct Selection Direct 105,413.39 Signed 2019-08-15 2019-09-05 2019-08-20 2020-01-27 2019-09-24 2019-10-07 building, and project 22 voix d'accès au site de la implementation support centrale photovoltaïque. PS/038/CW/RFQ/20 / Component 3: Institutional Pending Aménagement bureau - strengthening, capacity Request for Single Stage - One 2020-12- IDA / D4300 Post Limited 0.00 Implementat 2020-04-25 2020-06-20 Travaux d'aménagement du building, and project Quotations Envelope 17 ion bureau implementation support National PS/049/CW/RFB/21 / Locaux Component 3: Institutional Procurement UGP-Réhabilitation des locaux Pending strengthening, capacity Request for Single Stage - One Document - 1 2022-01- UGP et installation IDA / D4300 Post Open - National 0.00 Implementat 2021-06-01 2021-07-27 building, and project Quotations Envelope Envelope 23 d'équipement de connexion ion implementation support process (Non internet de type VSAT Bank-SPD) PS/018/CW/RFB/19 / Centre Component 3: Institutional Other (with Pending VBG-Construction d'un centre strengthening, capacity Single Stage - One 2020-06- IDA / D4300 Post Request for Bids Open - National field for 0.00 Implementat 2019-08-27 2019-09-01 2019-10-13 2019-11-12 2019-12-17 d'accueil pour les femmes building, and project Envelope 14 explanation) ion victimes VBG implementation support GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PS/009/FOUR/DC/18 / Matériel informatiques- Acquisition du matériel Component 3: Institutional Pending informatique pour les experts strengthening, capacity Request for Single Stage - One IDA / V1260 Post Limited 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 assistants en Passation des building, and project Quotations Envelope on Marchés, en comptabilité, en implementation support Suivi-évaluation, en Suivi- environnemental et social. PS/016/GO/RFB/19 / Lignes et Equipements-Fourniture Component 2: Strengthening Single Stage - One des lignes, équipements de IDA / D4300 of the transmission and Prior Request for Bids Open - International 5,269,007.08 Under Review 2019-08-13 2020-05-14 2019-08-18 2020-05-25 2019-09-29 2020-07-24 2019-10-29 2020-09-24 2019-12-03 2020-12-09 2020-05-31 Envelope distribution et raccordements distribution (T&D) networks pour nouveaux clients PS/017/GO/RFB/19 / Moyens Component 3: Institutional roulants-Acquisitions de Under strengthening, capacity Single Stage - One véhicules et motos pour l'UGP, IDA / D4300 Post Request for Bids Open - National 0.00 Implementati 2019-07-16 2019-07-16 2019-07-21 2019-08-15 2019-09-01 2019-10-01 2019-11-05 2020-05-03 building, and project Envelope l'ENERCA et DGE pour la on implementation support supervision du projet PS/039/GO/RFQ/20 / Component 3: Institutional Mobiliers-Fourniture de strengthening, capacity Request for Single Stage - One IDA / D4300 Post Limited 39,365.39 Completed 2020-04-29 2020-10-16 2020-06-24 2021-02-10 2020-12-21 2021-05-18 mobiliers pour l'Unité de building, and project Quotations Envelope gestion du PURACEL/PASEEL implementation support PS/042/GO/RFB/20 / Logistique-Fourniture de Component 2: Strengthening Under Single Stage - One logistique pour les travaux de IDA / D4300 of the transmission and Post Request for Bids Open - National 0.00 Implementati 2020-09-18 2020-11-10 2020-09-23 2020-12-08 2020-11-04 2020-12-04 2021-01-08 2021-07-07 Envelope distribution en régie par distribution (T&D) networks on l'ENERCA. PS/043/GO/RFB/20 / Téléconduite-Fourniture et installation d'un système de Component 2: Strengthening Under Single Stage - One contrôle commande IDA / D4300 of the transmission and Prior Request for Bids Open - International 0.00 Implementati 2020-09-18 2020-11-03 2020-09-23 2020-11-09 2020-11-04 2021-01-28 2020-12-04 2021-06-18 2021-01-08 2021-07-07 Envelope numérique et mise en place distribution (T&D) networks on d'un système de téléconduite SCADA. Page 1 PS/053/GO/DIR/21 / Equipements SIE-Fourniture Component 3: Institutional Pending d'équipements informatiques strengthening, capacity IDA / D4300 Post Direct Selection Direct 0.00 Implementati 2021-06-07 2021-06-12 2021-07-17 2022-01-13 à la cellule chargée du building, and project on Système d'Information implementation support Energétique de la RCA PS/044/GO/RFB/20 / Component 3: Institutional Pending Véhicule IC-Acquisition d'un strengthening, capacity IDA / D4300 Post Direct Selection Direct 0.00 Implementati 2020-12-04 2020-12-09 2021-01-13 2021-07-12 véhicule 4x4 pour la mission building, and project on de l'Ingénieur Conseil. implementation support Component 3: Institutional PS/048/GO/DIR/21 / strengthening, capacity Véhicule UGP-Acquisition de IDA / D4300 Post Direct Selection Direct 78,510.25 Signed 2021-06-07 2021-06-03 2021-06-12 2021-06-03 2021-07-17 2021-06-15 2022-01-13 building, and project moyens roulants pour l'UGP implementation support NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PS/001/SC/SFQC/18 / EIES- Recrutement d'un consultant pour la réalisation des Etudes Component 3: Institutional d'Impact Environnemental et strengthening, capacity Quality And Cost- Social, les Plans de Gestion IDA / V1260 Prior Open - International 0.00 Canceled 2018-05-30 2018-06-20 2018-08-03 2018-08-31 2018-09-30 2018-11-04 2018-12-09 2019-12-09 building, and project Based Selection Environnementale et Sociale y implementation support compris le Plan d'Actions de Réinstallation de la Centrale Solaire de Bangui PS/005/SC/SFQC/18 / MOC- Recrutement d'un consultant- firme-pour la supervision de Component 3: Institutional l'exécution des travaux de strengthening, capacity Quality And Cost- construction de la centrale de IDA / V1260 Prior Open - International 3,939,124.70 Signed 2018-06-20 2018-07-26 2018-07-11 2018-08-24 2018-10-10 2018-09-21 2019-06-13 2018-10-21 2021-05-16 2018-11-25 2021-05-17 2018-12-30 2021-05-25 2019-12-30 building, and project Based Selection champ solaire à Bangui ainsi implementation support que l'exécution des travaux liés au renforcement du réseau de transmission. PS/008/SC/SQC/18 / Agence Component 3: Institutional publicitaire-Recrutement Consultant strengthening, capacity d'une Agence publicitaire IDA / V1260 Post Qualification Open - National 0.00 Canceled 2018-11-15 2018-12-06 2019-01-19 2019-02-18 2019-03-25 2019-09-21 building, and project pour une campagne de Selection implementation support sensibilisation. PS/002/CS/SQC/18 / Etudes topo-Recrutement d'un consultant-individuel-pour Component 3: Institutional Consultant les études géologiques, strengthening, capacity IDA / V1260 Post Qualification Open - National 0.00 Canceled 2018-11-20 2018-12-11 2019-01-24 2019-02-23 2019-03-30 2019-09-26 topographiques et building, and project Selection hydrologiques du site implementation support d'implantation de la centrale solaire. PS/01/SC/SFQC/18 / Component 1: Construction Consultant EIES/PGES/PAR - Composante IDA / V1260 of a Solar PV Electricity Post Qualification Open - International 241,088.25 Signed 2018-05-30 2018-09-21 2018-06-20 2018-08-03 2018-05-24 2018-09-02 2018-07-18 2018-10-07 2018-09-17 2019-04-05 1 et Cadre environnemental Generation Plant Selection composante 2 PS/013/SC/SFQC/19 / EIES Composante 2-Recrutement d'un Consultant pour la Component 2: Strengthening Consultant réalisation des Etude d'Impact IDA / V1260 of the transmission and Post Qualification Open - International 256,208.28 Signed 2019-04-08 2019-04-12 2019-04-29 2019-06-12 2019-07-26 2019-07-12 2019-11-26 2019-08-16 2020-01-13 2020-02-12 Environnemental et Social distribution (T&D) networks Selection (EIES) et d'un Plan d'Action de Réinstallation (PAR) pour la composante 2 PS/024/CS/CQS/19 / Audit Component 3: Institutional financier du Projet- Consultant strengthening, capacity Under Recrutement d'un IDA / D4300 Post Qualification Open - International 0.00 2019-11-05 2019-03-29 2019-11-26 2020-01-09 2019-04-15 2020-02-08 2020-03-14 2020-09-10 building, and project Implementation consultant/Firme pour l'audit Selection implementation support financier du Projet PS/020/CS/CQS/19 / Energies renouvelables- Recrutement d'une firme pour Component 3: Institutional l'élaboration de la politique de Consultant strengthening, capacity Under promotion des énergies IDA / D4300 Post Qualification Open - International 0.00 2019-09-05 2020-01-25 2019-09-26 2019-11-09 2019-12-09 2020-01-13 2020-07-11 building, and project Implementation renouvelables et l'efficacité Selection implementation support énergétique, et d'un prospectus pour la promotion des énergies renouvelables PS/021/CS/CQS/19 / Etude Component 3: Institutional Consultant tarifaire-Recrutement d'une strengthening, capacity Under IDA / D4300 Post Qualification Open - International 0.00 2019-07-10 2019-07-25 2019-07-31 2019-09-17 2019-09-13 2020-08-25 2019-10-13 2019-11-17 2020-05-15 firme pour l'élaboration de building, and project Implementation Selection l'étude tarifaire implementation support PS/023/CS/QCBS/19 / Panneaux solaires pour bâtiments-Recrutement d'une Component 3: Institutional firme pour l'étude de strengthening, capacity Quality And Cost- Under IDA / D4300 Post Open - International 0.00 2019-09-03 2019-09-30 2019-09-24 2019-11-07 2020-06-17 2019-12-05 2020-01-04 2020-02-08 2020-03-14 2021-03-14 faisabilité pour les panneaux building, and project Based Selection Implementation solaires à usage domestique implementation support et panneaux solaires pour bâtiments publics Page 2 PS/025/CS/QCBS/19 / Etudes 15 MWc-Recrutement d'un Consultant chargé de la Component 3: Institutional réalisation des Etudes d'Avant strengthening, capacity Quality And Cost- Under Projet Sommaires, d'Avant IDA / D4300 Post Open - International 0.00 2019-06-26 2019-07-25 2019-07-17 2019-08-24 2019-08-30 2019-09-27 2019-10-27 2019-12-01 2020-01-05 2021-01-04 building, and project Based Selection Implementation Projet Détaillé, préparation implementation support des Dossiers d'Appels d'Offres, de construction d'un champ solaire 15 MWc PS/030/CS/QCBS/19 / Audit financier 19-Recrutement Component 3: Institutional d'un Consultant/Firme chargé strengthening, capacity Quality And Cost- Under de réaliser l'audit comptable IDA / D4300 Post Open - International 29,665.93 2019-11-15 2019-12-16 2019-12-06 2020-01-19 2020-04-14 2020-02-16 2020-06-18 2020-03-17 2020-06-28 2020-04-21 2020-08-31 2020-05-26 2021-05-26 building, and project Based Selection Implementation et financier du PURACEL pour implementation support les exercices clos en 2019, 2020 et 2021. PS/022/CS/CQS/19 / PPP- Component 3: Institutional Consultant Recrutement d'une firme pour strengthening, capacity IDA / D4300 Post Qualification Open - International 0.00 Canceled 2019-09-19 2019-10-10 2019-11-23 2019-12-23 2020-01-27 2020-07-25 l'élaboration du cadre building, and project Selection juridique pour les PPP implementation support PS/007/CS/SQC/18 / Support juridique- Component 3: Institutional Consultant Recrutement d'un consultant - strengthening, capacity IDA / V1260 Post Qualification Open - International 0.00 Canceled 2019-01-30 2019-02-20 2019-04-05 2019-05-05 2019-06-09 2019-12-06 firme-pour l'élaboration du building, and project Selection support juridique en appui à implementation support la préparation du projet. PS/051/CS/CQS / Action VBG- Component 3: Institutional Consultant Recrutement d'une ONG pour strengthening, capacity IDA / D4300 Post Qualification Open - National 0.00 Under Review 2021-10-11 2021-05-28 2021-11-01 2021-12-15 2022-01-14 2022-02-18 2022-08-17 la mise en œuvre du plan building, and project Selection d'action VBG implementation support INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PS/003/SC/CI/18 / Système SCADA-Recrutement d'un Component 3: Institutional consultant individuel pour les Individual strengthening, capacity études de faisabilité de IDA / V1260 Post Consultant Open 0.00 Under Review 2018-07-31 2018-07-24 2018-09-18 2018-10-09 2018-11-13 2019-05-12 building, and project renforcement du réseau de Selection implementation support transmission et d'installation d'un système SCADA. PS/010/SC/CDS/18 / Etudes hydrologiques-Recrutement d’un consultant/firme pour la réalisation des études Component 1: Construction hydrologiques du site de la IDA / V1260 of a Solar PV Electricity Post Direct Selection Direct 16,386.74 Signed 2018-11-30 2019-08-24 2018-12-10 2018-12-04 2019-02-13 2019-02-08 2019-08-12 construction de la centrale Generation Plant photovoltaïque à Danzy (18 km de Bangui sur la route de Boali) PS/011/SC/CDS/18 / Etudes géotechniques-Recrutement d’un consultant/firme pour la réalisation des études Component 1: Construction géotechniques du site de la IDA / V1260 of a Solar PV Electricity Post Direct Selection Direct 16,947.16 Signed 2018-11-28 2019-08-24 2018-12-08 2018-12-04 2019-02-11 2019-02-08 2019-08-10 construction de la centrale Generation Plant photovoltaïque a Danzy (18 km de Bangui sur la route de Boali) PS/012/SC/CDS/18 / Levées topographiques-Recrutement d’un consultant/firme pour Component 1: Construction la réalisation des levés IDA / V1260 of a Solar PV Electricity Post Direct Selection Direct 22,987.72 Signed 2018-11-30 2019-08-24 2018-12-10 2018-12-04 2019-02-13 2019-02-08 2019-08-12 topographiques du site Generation Plant construction de la centrale solaire à Danzy (18 km de Bangui sur la route de Boali) PS/03/SC/CI/18 / SCADA- Component 2: Strengthening Individual Etudes de faisabilite du IDA / V1260 of the transmission and Post Consultant Direct 60,840.00 Signed 2018-10-24 2019-08-24 2018-11-03 2019-09-05 2018-11-24 2019-09-05 2018-12-29 2018-12-04 2019-06-27 renforcement du reseau de distribution (T&D) networks Selection transmission PS/026/CS/INDV/19 / Appui Individuel-Appui technique Component 3: Institutional d'un Consultant individuel à la Individual strengthening, capacity passation de marchés dans le IDA / D4300 Post Consultant Direct 22,000.00 Signed 2019-06-20 2019-08-24 2019-06-30 2019-09-04 2019-07-21 2019-06-20 2019-08-25 2019-06-22 2020-02-21 building, and project cadre du Projet d'Urgence de Selection implementation support Fourniture et d'Accès à l'Électricité (PURACEL) PS/027/CS/CDS/19 / Appui Cabinet- Recrutement d'un Cabinet appui technique à la passation des marchés de la Component 4: Contingent première étape de l'Appel à IDA / D4300 Post Direct Selection Direct 62,207.00 Signed 2019-06-20 2019-08-24 2019-06-30 2019-09-04 2019-09-03 2019-06-27 2020-03-01 emergency response Proposition pour la réalisation de la centrale photovoltaïque de Danzi à 18 km de Bangui sur la route de Boali. PS/028/SC/CDS/19 / Levées complémentaires-Réalisation des levées topographiques Component 3: Institutional complémentaires du site de strengthening, capacity IDA / D4300 Post Direct Selection Direct 49,356.37 Signed 2019-07-05 2019-08-29 2019-07-15 2019-09-05 2019-09-18 2019-09-19 2020-03-16 construction de la centrale building, and project photovoltaïque à Danzi (18 implementation support km de Bangui sur la route de Boali) Page 3 PS/032/SC/INDV/19 / Expert Passation Marchés- Recrutement d'un Expert en Component 3: Institutional Individual Passation des Marchés pour le strengthening, capacity Under IDA / D4300 Post Consultant Open 0.00 2019-11-26 2019-11-21 2020-01-14 2020-01-15 2020-02-04 2020-05-19 2020-03-10 2020-09-06 Projet d'Urgence de fourniture building, and project Implementation Selection et d'Accès à l'Electricité et du implementation support Projet d'Amélioration des Services d'Eau et d'Electricité. PS/31/SC/INDV/19 / Expert Gestion Financière- Component 3: Institutional Recrutement d'un Expert en Individual strengthening, capacity Gestion Financière à la Cellule IDA / D4300 Post Consultant Open 141,194.04 Signed 2019-11-27 2019-11-21 2020-01-15 2020-03-18 2020-02-05 2020-03-18 2020-03-11 2020-03-27 2020-09-07 building, and project PFTT sise Ministère des Selection implementation support Travaux Publics et de l'Entretien Routier. PS/033/SC/INDV/19 / Coordonnateur-Recrutement Component 3: Institutional d'un Coordonnateur pour le Individual strengthening, capacity Projet d'Urgence de fourniture IDA / D4300 Prior Consultant Open 64,255.32 Signed 2019-11-25 2019-11-21 2020-01-13 2020-02-06 2020-02-03 2020-02-06 2020-03-09 2020-02-18 2020-09-05 building, and project et d'Accès à l'Electricité et le Selection implementation support Projet d'Amélioration des Services d'Eau et d'Electricité. Component 3: Institutional PS/034/CS/CDS/19 / Experts strengthening, capacity Energies-Renouvellement du IDA / D4300 Post Direct Selection Direct 22,673.17 Signed 2019-12-30 2020-01-07 2020-01-09 2020-01-20 2020-03-14 2020-01-16 2020-09-10 building, and project contrat des Experts en Energie implementation support PS/35/CS/CDS/19 / Géotechnique complémentaire- Recrutement d'un consultant en charge des études Component 3: Institutional géotechniques strengthening, capacity Under complémentaires de la IDA / D4300 Post Direct Selection Direct 0.00 2019-12-30 2020-01-09 2020-03-14 2020-09-10 building, and project Implementation seconde voie et la voie de implementation support sécurité du site de la centrale photovoltaïque de Danzi à 18 km de Bangui sur la route de Boali. PS/037/IND/20 / Assistant(e) Component 3: Institutional Individual - Recrutement d'un(e) strengthening, capacity IDA / D4300 Post Consultant Open 906.08 Signed 2020-04-23 2020-04-14 2020-06-11 2020-06-22 2020-07-02 2020-06-25 2020-08-06 2020-07-01 2021-02-02 Assistant de coordination du building, and project Selection PURACEL/PASEEL implementation support PS/036/IND/20 / Audit PAR 1- Recrutement d'un consultant Component 3: Institutional Individual individuel chargé de réaliser strengthening, capacity IDA / D4300 Post Consultant Open 10,766.95 Signed 2020-04-21 2020-05-05 2020-06-09 2020-07-21 2020-06-30 2020-07-28 2020-08-04 2020-08-12 2021-01-31 l'audit du Plan d'Action de building, and project Selection Réinstallation de la implementation support composante 1 du PURACEL. Component 3: Institutional PS/040/SC/INDV/20 / Expert Individual strengthening, capacity VGB-Recrutement d'un Expert IDA / D4300 Post Consultant Open 2,418.94 Signed 2020-07-07 2020-07-15 2020-08-25 2020-10-05 2020-09-15 2020-10-12 2020-10-20 2020-10-26 2021-04-18 building, and project VGB Selection implementation support PS/041/SC/INDIV/20 / Component 3: Institutional Experts Energies- strengthening, capacity Renouvellement du Contrat de IDA / D4300 Post Direct Selection Direct 57,386.16 Signed 2020-09-30 2020-09-16 2020-10-10 2020-12-02 2020-12-14 2020-12-23 2021-06-12 building, and project deux (2) Experts en Energie implementation support du PURACEL/PASEEL PS/047/SC/INDV/21 / Component 3: Institutional Recrutement par entente strengthening, capacity directe de deux chauffeurs IDA / D4300 Post Direct Selection Direct 8,932.56 Signed 2021-02-25 2021-03-11 2021-03-07 2021-03-24 2021-05-11 2021-05-04 2021-11-07 building, and project mise à disposition du implementation support PURACEL/PASEEL par l'ENERCA Component 3: Institutional PS/046/SC/INDV/21 / Individual strengthening, capacity Avenant1-Renouvellement du IDA / D4300 Post Consultant Direct 75,438.30 Signed 2021-02-23 2021-02-19 2021-03-05 2021-02-17 2021-03-26 2021-02-17 2021-04-30 2021-02-18 2021-10-27 building, and project Contrat du Coordonnateur Selection implementation support PS/050/CS/INDV/21 / Component 3: Institutional Contrôle SCADA-Recrutement Individual strengthening, capacity Pending d'un Consultant individuel IDA / D4300 Post Consultant Open 0.00 2021-07-06 2021-08-24 2021-09-14 2021-10-19 2022-04-17 building, and project Implementation pour la supervision et contrôle Selection implementation support des travaux PS/052/CS/INDV/21 / Appui SIE-Recrutement d'un Component 3: Institutional Consultant Individuel pour Individual strengthening, capacity Under renforcer les capacités de la IDA / D4300 Post Consultant Open 0.00 2021-05-10 2021-06-18 2021-06-28 2021-07-19 2021-08-23 2022-02-19 building, and project Implementation cellule chargée du Système Selection implementation support d'Information Energétique de la RCA PS/054/CS/INDV/21 / Component 3: Institutional Assistante 2 - Recrutement Individual strengthening, capacity Under d'un(e) Assistant(e) de IDA / D4300 Post Consultant Open 0.00 2021-05-18 2021-05-31 2021-07-06 2021-07-27 2021-08-31 2022-02-27 building, and project Implementation Coordination du Selection implementation support PURACEL/PASEEL PS/006/SC/CI/18 / Fonds vert climat-Recrutement d'un Component 3: Institutional Individual consultant individuel pour la strengthening, capacity IDA / V1260 Post Consultant Open 0.00 Canceled 2018-12-05 2019-01-23 2019-02-13 2019-03-20 2019-09-16 préparation de la requête de building, and project Selection financement auprès du Fonds implementation support Vert Climat. PS/045/SC/INDV/21 / Manuel Procédures- Recrutement d'un Consultant Individuel chargé de Component 3: Institutional Individual l'élaboration du manuel strengthening, capacity Pending IDA / D4300 Post Consultant Limited 0.00 2021-02-12 2021-02-17 2021-03-10 2021-04-14 2021-10-11 unique de procédures building, and project Implementation Selection administratives, financières, implementation support comptables et de la passation des marchés pour la gestion du PURACEL/PASEEL. Page 4 PS/055/CS/INDV/21 / Stratégie d'électricité- Component 3: Institutional Recrutement d'un Consultant Individual strengthening, capacity Under Individuel chargé de la IDA / D4300 Post Consultant Open 0.00 2021-06-10 2021-06-17 2021-07-29 2021-08-19 2021-09-23 2022-03-22 building, and project Implementation préparation d'une politique et Selection implementation support d'une stratégie pour accroitre l'accès à l'électricité en RCA. PS/056/CS/INDV/21 / PIP- Recrutement d'un Consultant Component 3: Institutional Individuel chargé de Individual strengthening, capacity Pending l'élaboration du décret et IDA / D4300 Post Consultant Open 0.00 2021-06-10 2021-07-29 2021-08-19 2021-09-23 2022-03-22 building, and project Implementation préparation du PIP pour Selection implementation support améliorer les finances et la performance de l'ENERCA. Page 5 Procurement Plan For Integrated Development for Source Sustainability and Climate Resilient Rain-fed Agriculture Project A World Bank Financed Project Project ID: P165129 [Procurement Plan Period: First 18 months of the Project] Covering the Period: January 2020 to June 2021 Submitted By Project Management Unit [PMU] Himachal Pradesh Forest Department Government of Himachal Pradesh India 2 3 PROCUREMENT PLAN Country: INDIA Borrower: Government of India on behalf of Government of Himachal Pradesh Project Name: Integrated Development for Source Sustainability and Climate Resilient Rain-fed Agriculture Project Project Implementation Agency: Project Management Unit [PMU], Himachal Pradesh Forestry Department [HPFD], Government of Himachal Pradesh Date of General Procurement Notice: December 18, 2019 Bank’s Approval Date of the Procurement Plan: Original … Revision 1: Revision 2: Date of the Procurement Plan: December 2019 Period covered by this Procurement Plan: January 2020 to June 2021 Applicable Procurement Rules. The Procurement of goods, works, consulting and non-consulting services to be financed by the Loan will be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers [dated July 2016; revised November 2017 and August 2018], and the provisions of the Loan Agreement. If there is conflict between government decrees, rules, and regulations and the Bank Procurement Regulations, then Bank’s Procurement Regulations shall prevail. The project will be subject to World Bank Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants [“Anti-Corruption Guidelines”], dated October 15, 2006 and revised in January 2011 and as of July 1, 2016. The project will use the online tool Systematic Tracking of Exchanges in Procurement [STEP] to prepare, clear, and update its procurement plan, for monitoring procurement activities and for communication between the Borrower and the Bank. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under Paragraph 4.4 of the Procurement Regulations are set forth in STEP. Unless otherwise agreed with the World Bank, the World Bank’s Standard Procurement Documents [SPD], Requests for Proposals, and Forms of Consultant Contract will be used. Procurement under national procedures will be carried out based on National Procurement Procedures [NPP] conditions agreed with the Government of India. Procurement estimated at Indian Rupees [INR] 5 Lakhs and above will be submitted through government eProcurement systems provided by NIC 4 www.hptender.gov.in which have been assessed and deemed acceptable by the Bank against Multilateral Development Bank [MDB] requirements. Financial Management [FM] Manual. The FM Manual prepared for the project shall have a separate chapter on Procurement which will provide clear guidance on applicable procurement arrangement, procedures and thresholds, and shall be made available on the project website. Community Operations Manual [COM]. The COM prepared for the project will have clear directives for the community [GPs/individual beneficiaries] with regard to eligible procurement expenditures and agreed procurement arrangements, procedures and thresholds, and shall be made available on the project website. This will serve as a guidebook for procurement, with a view to providing operating instructions and bring in greater transparency and predictability in procurement procedures under the Project. Procurement Arrangements and Profile. Procurement under the Project will be carried out at the central level by the Project Management Unit [PMU] headed by the Chief Project Director [CPD] established for the Project, at the District level by the District Project Officers assisted by the Accounts Assistant at the District Level in each of the 10 District Project Offices [DPOs] located in the Districts covered under the Project [Shimla, Solan, Sirmour, Bilaspur, Hamirpur, Mandi, Kullu, Chamba, Kangra and Una], and by beneficiary GPs [supported by DPOs] at the GP level, in accordance with their approved Gram Panchayat Resource Management Plans [GP-RMP]/MG/OMIF. Officials of the PMU have prior experience of implementing a World Bank financed project and have also undergone training in STEP. GPs will need to be capacitated and provided basic procurement training on applicable procurement procedures and procurement documentation requirements outlined in COM, before initiating their procurements. To meet the readiness requirements of the Department of Economic Affairs [DEA] of the Government of India, the Project has already initiated and awarded contract for critical consultancy package for Environmental and Social Assessment to be retroactively financed by the Bank. The project envisages procurement of low-risk, low-value goods, works and services as below: a. Goods and Non-Consulting Services to be procured under the project are likely to include the following. At State/PMU level, purchase of IT Equipment such laptops, computers, printer, etc., procurement of printing services for IEC, office vehicles, office furniture, etc. are envisaged. At District and GP level, procurement activities will include procurement of Barbed Wire, U/Staple, Tools, Gunny Bags, Vermicompost/ Farm yard Manure, Sand, Seeds, Wooden posts/ poles, Seedlings, Grass tufts, Sign boards/hand prints, seed testing instrument, Seed, Fertilizer, Pesticide, Livestock - Small and Large Ruminants, Agricultural Tools and Implements, equipment, Farm machinery, e.g., power tiller, chaff cutters, pipes, tarpaulins, Medicines, supplements, sprinklers, seedlings, etc. b. Procurement of Minor Civil Works is likely to include the following. At State/ PMU level, procurement of minor civil works will include extension, refurbishment and repair of office buildings, etc. At District and GP level, procurement activities will include procurement of works for construction of Water storage tanks, water channels, vermicompost pits, livestock Mangers, foot bridges, water lifting pumps, GI pipes, accessories, installation of ropeways, Ponds, Check Dams, Subsurface Dykes, Sump Wells etc. and labor contracts for preparing land 5 for nursery, preparing nursery beds, water tank, works of filling gunny bags, sowing of seeds, preparing temporary nursery sheds, watering, hoeing, weeding, , fencing, bush cutting, pit digging, planting seedlings, preparing contour trenches, planting grass tufts, drainage line treatment works, fire management works, allowances and incentives for fire management, Spring development, eradication of exotic weed- lantana, etc. It may be noted that civil works at GP level are demand driven. There are no major civil works contracts envisaged in the project. c. Consultancy Services to be procured under the project are likely to include services for developing a web-based portal for Integrated Financial Management Information System [IFMS], Water Monitoring and Modelling, Value Chain Scoping Studies, Technical Support Study for addressing the needs of Transhumant, M and E, MIS, Baseline Survey, External and Internal Audit, Third Party Verification agent to verify achievement of Disbursement Related Results [DLR]s, need based assessments and studies, individual experts, etc. No consultancy services contracts envisaged at the District/Sub-district levels. The project includes several features of a decentralized, demand-driven project, and activities to be taken up at the community level by selected beneficiaries shall be as per the GP-RMP approved by the PMU of the HP Forestry Department/MG/OMIF. The threshold of procurement activities at community level is expected not to exceed Request for Quotation [RFQ] threshold. Community-level procurement shall follow Community-Driven Development [CDD] arrangements as per the Bank’s Procurement Regulations and as outlined in the Community Operations Manual [COM] currently under preparation. Given other on-going government programs, the activities to be funded following COM shall be identified upfront to avoid double-dipping and will require very close monitoring and oversight. Project Procurement Strategy for Development [PPSD] and Procurement Plan. According to the requirement of the Regulations, a Project Procurement Strategy for Development [PPSD] has been developed, based on which the Procurement Plan for the first 18 months has been prepared. The PPSD describes how procurement in this project will support the Project Development Objective [PDO] and deliver value for money under a risk-based approach. It provides adequate supporting market analysis for the selection methods detailed in the procurement plan. The procurement plan specifies for each contract: [i] a description of the activities/contracts; [ii] selection methods to be applied; [iii] estimated cost; [iv] time schedules; [v] World Bank review requirements; and [vi] any other relevant procurement information. PMU shall submit to the World Bank, for its review and approval, any updates of the procurement plan approved by the World Bank. The project will use Systematic Tracking of Exchanges in Procurement [STEP] system for all its procurement activities carried out at the PMU [Centre] and District levels. Summary from PPSD. The project is preparing its Procurement Strategy document. As per the draft document, the project’s total value is US $100 million of which procurement spend is approximately 80 %. Extensive market analysis has been carried out for procurement packages and decisions on packages are made to ensure adequate participation of bidders. Consultancy contracts are framed based on market research and packaging decided in terms of scope of services and period. Based on the need assessment, the project has decided to 6 use Government e Marketplace [GeM]1 for procurement of Goods up to US $100,000 and as mentioned under the paragraph in the Procurement Plan on National Procurement Procedures. Procurement Capacity Building. Though project staff has past experience of implementing World Bank financed HP Mid-Himalayan Watershed Development Project [HPMHWDP] governed by the Bank’s Procurement Guidelines, however, they need to be exposed to the Procurement Regulations applicable to the Project. HP Forestry Department will be sending key procurement staff of PMU and DPOs to the Indian Institute of Management [IIM], Lucknow or the Administrative Staff College of India [ASCI], Hyderabad from time to time to attend procurement training on World Bank Procurement Framework [PF] applicable to the project. Presently, project staff from PMU and two DPOs will be attending the two-week residential training program on World Bank Procurement Regulations conducted at ASCI, Hyderabad in February 2020. These officials will subsequently provide training to other project staffs prior to implementation of the procurement activities in the project. The PMU/DPOs/APOs will also provide basic procurement training to GPs/Beneficiaries once the Gram Panchayat Resource Management Plan [GP-RMP] is approved by DPO/PMU, and before commencing implementation of GP-RMP. The project officials can also avail of the free Massive Open Online Course on public procurement www.procurementlearning.org offered by the Bank to build their capacity. The Bank had already conducted one training on STEP for PMU officials and will organize STEP training again on need basis for the concerned DPOs staff in near future. Procurement Planning. For each contract to be financed by the Loan, the different procurement methods or consultant selection methods to be used, the need for pre-qualification, estimated costs, prior review requirements, and time frame will be reflected in the Procurement Plan to be agreed between the Borrower and the Bank team. The Procurement Plan will be uploaded in STEP by PMU/DPOs and the approved procurement plan will be disclosed on the project website and Bank’s external website. The procurement plan for the first 18 months of project implementation and all its updates will be submitted to the Bank through STEP, and will lay out the appropriate, fit for purpose market approach and selection methods for procurement of goods, works, non-consulting and consulting services financed by the Bank. It will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity. eProcurement. Currently, the Himachal Pradesh Forestry Department of the Government of Himachal Pradesh is using e-procurement system for its procurement. However, PMU housed in the Forestry Department will be carrying out procurement using eProcurement for the first time in the project, therefore, their capacity building needs to be done for eProcurement. The project will make use of Government of India’s National Informatics Centre [NIC] platform assessed by the Bank against Multilateral Development Bank [MDB] requirements for procurements estimated at INR 5 Lakhs and above. Advance Contracting with Retroactive Financing. For effective project implementation and start-up, the project has initiated advance contracting of critical consultancies for Preparation of Environmental and Social Framework [ESF] and Project Implementation Plan [PIP], and procurement of small value goods such 1 https://gem.gov.in/ 7 as tools, gunny bags, seeds, IT equipment and accessories, vehicles, etc.] and works [very small value labor contracts for Development of Nurseries [52 nos.] in 26 clusters in 10 Districts covering 428 GPs. The total value of this spend is approximately 1.2 % of the Bank loan. Payment made by PMU/HPFD for these contracts following World Bank procurement procedures during the 12 months prior to the tentative Loan signing date shall be eligible for retroactive financing. Record Keeping. All records pertaining to award of tenders/selection of consultants, including tender notification/advertisement, register pertaining to sale and receipt of bids, bid/proposal opening minutes, bid/technical and financial evaluation reports, comparative statements, Goods, Receipt Note [GRN] and all correspondence pertaining to bid evaluation, communication sent to/with the Bank in the process, bid securities, and approval of invitation/evaluation of bids/proposals would be maintained by the PMU and at DPO/GP level. Contract Management. The PMU, HPFD will be responsible for overall procurement and contract management under the project. At the Centre, procurement staff will be responsible for contract monitoring and supervision of contracts awarded by PMU. At DPO level, contract monitoring and supervision will be done by technical staff at DPOs/APOs level [Agriculture, Animal Husbandry/Engineering staff of technical wing of DPO level and Forest Extension and Social Extension staff at APO level] to ensure timely delivery of quality outputs from the procurement contracts in the project areas. All payments will be made by DPOs for district and sub-district level procurements after receipt of Goods receipt Note [GRN]. Work Completion Certificates, etc. The Integrated Financial Management Information System [IFMIS] being developed under the Project will facilitate monitoring of various procurement activities in terms of physical and financial achievements on a monthly basis. The day to day monitoring of procurement activities will be done by APOs/DPOs at field level which will be updated in the online web-based system at district level and will be reviewed by PMU at the Centre. Complaint Handling Mechanism. A complaint handling mechanism to address procurement-related complaints under the Project will be developed and implemented by the PMU/DPOs to the satisfaction of the Bank. Upon receipt of complaints, immediate action would be initiated to acknowledge the complaint and to redress it within a reasonable timeframe. All complaints will be addressed at levels higher than the level at which the procurement process was undertaken, or the decision was taken. Any complaint received will also be forwarded to the Bank for information, and the Bank would be kept informed after the complaint is redressed. Leased Assets: Not Applicable Procurement of Secondhand Goods: Not Applicable Domestic Preference: The provision of domestic preference will be applied in the evaluation of bids in accordance with Annex VI of the Regulations. Procurement Thresholds and Prior Review Thresholds. The table below describes various procurement methods to be used for activities financed by the Loan. 8 Table 1: Procurement Thresholds Procurement approach and method Thresholds [US$ equivalent] Open International [Goods, IT, and >10 million Non-consulting services] – Request for Bids [RFB] Open National [Goods, IT, and Non- >100,000 and up to 10 million consulting services] – Request for Bids [RFB] National Request for Quotation Up to 100,000 [RFQ] – [Goods/Works/Non- consulting Services] Open International [Works] – >40 million Request for Bids [RFB] Open National [Works] - Request for >100,000 and up to 40 million Bids [RFB] Direct Selection With prior agreement, based on justification Framework Agreement For Goods/Works/Non-consulting services: According to paragraphs 6.57-6.59 of Section VI of the Regulations. For Consulting services: According to paragraph 7.33 of Section VII the Regulations. Force Account In accordance with paragraphs 6.54 and 6.55 of Section VI of the Procurement Regulations, and with prior agreement in Procurement plan with the Bank. Consulting Services [Firms] CQS: As per requirements of paragraphs 7.11 and 7.12 of Section VII of the Regulations. LCS, FBS: in justified cases QCBS, QBS: in all other packages Shortlist of National Consultants Up to 800,000 Procurement prior-review thresholds2. Based on the current procurement risk rating of ‘Moderate’, the World Bank will prior review the following contracts: (a) Works [including turnkey, supply and installation of plant and equipment and PPP]: All contracts more than US $15 million equivalent 2 Determination of whether a contract meets the prior review threshold is based on : (i) the total value of the contract, including all taxes and duties payable under the contract; (ii) a contract whose cost estimate was below the Bank’s prior review threshold is subject to prior review if the price of the lowest evaluated responsive bid (or, in the case of consulting services, the financial offer of the selected firm) exceeds such threshold at the bid evaluation stage; and (iii) in the case of a slice and package arrangement, the prior review threshold is determined based on the aggregate value of individual contracts to be awarded under such arrangement. 9 (b) Goods and Information Technology: All contracts > US $4 million equivalent (c) Non-consulting Services: All contracts > US $4 million equivalent (d) Consulting Services: Firms: All contracts >US $2 million equivalent (e) Consulting Services: Individuals: All contracts > US $400,000 equivalent (f) Direct Selection: The justification of Direct Selection for all contracts The above thresholds are for the initial 18-month implementation period. Based on the procurement performance of the project, these thresholds may be subsequently modified. Even for large-value post review cases, the inputs of the World Bank on technical specifications will be obtained by the project. Irrespective of the thresholds, Terms of Reference shall be prior reviewed by Bank. The prior review thresholds will also be indicated in the Procurement Plan. The Procurement Plan will be subsequently updated annually [or at any other time if required] and will reflect any change in the prior review thresholds. The details of National Procurement Procedures are outlined in the Procurement Plan. Prior review contracts. In the case of contracts subject to prior review, PMU, HPFD/DPOs will seek the World Bank’s no objection before granting/agreeing to: [a] an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; [b] any substantial modification of the scope of Works, goods, IT system; non-consulting services, or consulting services and other significant changes to the terms and conditions of the contract; [c] any variation order or amendment [except in cases of extreme urgency] that, singly or combined with all variation orders or amendments previously issued, increases the original contract amount by more than 15 percent; and [d] the proposed termination of the contract. Complaints received in all prior review cases shall be sent to Bank for review and the response to the complaint in such cases, shall be cleared with the Bank. Complaints with allegations of fraud and corruption, shall be shared with Bank, irrespective of the thresholds. Disclosure of procurement information. The following documents shall be disclosed on the project/state websites: [a] Procurement Plan and its updates; [b] an invitation for bids for procurement of Works, Goods, IT system procurement and non-consulting services; [c] request for expression of interest for selection/hiring of consulting services; [d] contract awards of Works, Goods, IT system procurement and non-consulting services procured following international and national procedures; [e] a list of contracts/purchase orders placed following RFQ [Request for Quotation] procedures on a quarterly basis; [f] a list of contracts following direct contracting [DC] on a quarterly basis; [g] an annual financial and physical progress report of all contracts; and [h] an action taken report on the complaints received on a quarterly basis. The following details shall be sent to the World Bank for publishing on the United Nations Development Business and the World Bank external website: [a] Specific Procurement Notice [i.e., invitation for bids] for procurement of Works, Goods, IT system procurement and non-consulting services using open international procedures; [b] Requests for Expression of Interests above US $800,000; [c] contract award details of all procurement of Works, Goods, IT system procurement and non-consulting services using open international procedure; and [d] a list of contracts/purchase orders placed following DC procedures on a quarterly basis. Further, the implementing agency will also publish on their websites any information required under the provisions of ‘suo moto’ disclosure as specified by the Right to Information Act. 10 National Procurement Procedure Conditions. National competition for the procurement of Works, Goods, IT system procurement and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3–5.5 of Section V of the Regulations and the following provisions: I. Only the model bidding documents for National Competitive Procurement [NCP] agreed with the GOI Task Force [and as amended for time to time], shall be used for bidding. II. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. III. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises or enterprises from any given State. IV. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. V. Government e-Marketplace [GeM] set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations [RFQ] method. VI. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. VII. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. VIII. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. IX. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. X. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social [including sexual exploitation and abuse and gender-based violence], health and safety [“ESHS”] risks and impacts. Oversight and Monitoring by the Bank. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. The Bank may conduct, at any time, Independent Procurement Reviews [IPRs] of all the contracts financed under the loan. High risk procurements, if any, will be identified for increased procurement and contract management support and indicated in the procurement plan. Bank team will provide additional due diligence and independent review of the contract performance of such identified procurements. 11 Procurement Review by the PMU, HPFD. Independent procurement post review [PPR] with reporting requirements and agreed with the Bank [As per Para 4 of Annex II of the Procurement Regulations] will be undertaken for the project for PMU’s own internal due diligence. PMU will hire PPR consultants as per Terms of Reference and reporting requirements agreed with the Bank to conduct PPR of PMU and DPOs on a half yearly basis. Other Special Selection Arrangements/Requirement Procurement by communities will be governed by the procedures outlined in the Community Operations Manual [COM] currently under preparation and in accordance with Paras 6.52 and 6.53 of Section VI of the Regulations. COM will be disclosed on the Project website. Procurement Plan as per STEP Tables: 12 PROCUREMENT India : Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2020-08-17 Revised Plan Date(s): (comma delineated, leave blank if none) 2021-06-01 Project ID: P165129 GPN Date: 2019-12-19 Project Name: Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh Loan / Credit No: IBRD / 90410 D Executing Agency(ies): istrict Project Office, Solan, Himachal Pradesh Forestry Department WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-DPO, SOLAN-176093-CW- RFQ / Development of New Nursery Site at Bagguwala under APO Dharampur. Component 1. Sustainable Under Request for Single Stage - One 2020-10- Keeping in view of low value IBRD / 90410 Land and Water Resource Post Limited 9,520.00 6,315.44 Implementat 2020-06-05 2020-01-24 2020-07-03 Quotations Envelope 31 and availability of perspective Management ion bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176370-CW- RFQ / Development of New Nursery at Sansiwala under APO Unit Dharampur. Keeping Component 1. Sustainable Request for Single Stage - One 2020-10- in view of low value and IBRD / 90410 Land and Water Resource Post Limited 8,753.00 8,385.04 Completed 2020-06-05 2020-01-24 2020-07-03 2020-02-10 Quotations Envelope 31 availability of perspective Management bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176374-CW- RFQ / Development of New Nursery at Charar under Kandaghat Unit. Keeping in Component 1. Sustainable Request for Single Stage - One 2020-11- view of low value and IBRD / 90410 Land and Water Resource Post Limited 1,354.00 1,296.07 Completed 2020-06-05 2020-02-15 2020-07-05 2020-02-18 Quotations Envelope 03 availability of perspective Management bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176375-CW- RFQ / Development of Nursery at Bhuria Nala under Component 1. Sustainable APO Unit Kandagaht. Keeping Request for Single Stage - One 2021-01- IBRD / 90410 Land and Water Resource Post Limited 4,351.00 4,165.23 Completed 2020-06-05 2020-02-15 2020-07-05 2020-02-18 in view of low value and Quotations Envelope 01 Management availability of perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176376-CW- RFQ / Development of Forest Nursery at Gaura under APO Component 1. Sustainable Kandagaht. Keeping in view of Request for Single Stage - One 2020-12- IBRD / 90410 Land and Water Resource Post Limited 1,413.00 1,352.37 Completed 2020-06-05 2020-02-15 2020-07-02 2020-02-18 low value and availability of Quotations Envelope 29 Management perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176385-CW- RFQ / Development New Forest Nursery at Jandu Pul under APO Rmshehar. Component 1. Sustainable Request for Single Stage - One 2020-10- Keeping in view of low value IBRD / 90410 Land and Water Resource Post Limited 3,531.00 3,382.73 Completed 2020-06-05 2020-01-22 2020-07-03 2020-02-10 Quotations Envelope 31 and availability of perspective Management bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176386-CW- RFQ / Development of New Forest Nursery at Bal Pangla under APO Unit Ramshehar. Component 1. Sustainable Request for Single Stage - One 2020-10- Keeping in view of low value IBRD / 90410 Land and Water Resource Post Limited 3,495.00 3,348.24 Completed 2020-06-05 2020-01-22 2020-07-02 2020-02-10 Quotations Envelope 30 and availability of perspective Management bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176436-CW- RFQ / Raising of Seedling (50000) at Jandu Pul Nursery under APO Unit Component 1. Sustainable Request for Single Stage - One 2020-10- Ramshehar.Keeping in view of IBRD / 90410 Land and Water Resource Post Limited 7,136.00 6,831.90 Completed 2020-06-06 2020-01-22 2020-07-03 2020-02-14 Quotations Envelope 31 low value and availability of Management perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176437-CW- RFQ / Raising of Seedling (50000) at Bal Pangala Nursery under APO Unit Component 1. Sustainable Request for Single Stage - One 2020-12- Ramshehar. Keeping in view IBRD / 90410 Land and Water Resource Post Limited 7,136.00 6,831.90 Completed 2020-06-06 2020-02-11 2020-07-03 2020-02-14 Quotations Envelope 30 of low value and availability of Management perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-176440-CW- RFQ / Lantana removal from Bhoarti Kaneta and Bramana areas in GP Chandi 17.60 ha Component 1. Sustainable by CRS method (75 to 100% Request for Single Stage - One 2020-12- IBRD / 90410 Land and Water Resource Post Limited 7,432.00 7,114.91 Completed 2020-06-06 2020-02-07 2020-07-03 2020-02-12 ).Keeping in view of low value Quotations Envelope 30 Management and availability of perspective bidder, limited market approach was adopted. This does not come under RF. Page 1 IN-DPO, SOLAN-177100-CW- RFQ / Raising of Seedling at Charar Forest Nursery Near Chawal Beat under APO Unit Component 1. Sustainable Request for Single Stage - One 2020-12- Kandaghat.Keeping in view of IBRD / 90410 Land and Water Resource Post Limited 2,870.00 2,741.70 Completed 2020-06-06 2020-02-15 2020-07-03 2020-02-17 Quotations Envelope 30 low value and availability of Management perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-177102-CW- RFQ / Raising of Seedling Bhuria Nala Nursery under APO Unit Kandaghat. Keeping Component 1. Sustainable Request for Single Stage - One 2020-10- in view of low value and IBRD / 90410 Land and Water Resource Post Limited 8,593.00 8,226.81 Completed 2020-06-06 2020-02-15 2020-07-03 2020-02-18 Quotations Envelope 31 availability of perspective Management bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-177103-CW- RFQ / Raising of Seedling at Gaura Forest Nursery under APO Unit Kandaghat.Keeping Component 1. Sustainable Request for Single Stage - One 2021-01- in view of low value and IBRD / 90410 Land and Water Resource Post Limited 2,867.00 2,739.40 Completed 2020-06-06 2020-02-15 2020-07-10 2020-02-17 Quotations Envelope 06 availability of perspective Management bidder, limited market approach was adopted.This does not come under RF. IN-DPO, SOLAN-177104-CW- RFQ / Raising of Seedling at Bagguwala Forest Nursery under APO Unit Dharampur.Keeping in view of Component 1. Sustainable Request for Single Stage - One 2020-08- low value and availability of IBRD / 90410 Land and Water Resource Post Limited 12,653.00 12,090.49 Completed 2020-06-06 2020-02-07 2020-07-03 2020-02-11 Quotations Envelope 02 perspective bidder, limited Management market approach was adopted. Work has already been completed.This does not come under RF. IN-DPO, SOLAN-177106-CW- RFQ / Raising of Seedling at Sansiwala Forest Nursery under APO Unit Dharampur. Component 1. Sustainable Request for Single Stage - One 2021-01- Keeping in view of low value IBRD / 90410 Land and Water Resource Post Limited 11,980.00 11,464.52 Completed 2020-06-06 2020-02-07 2020-07-05 2020-02-10 Quotations Envelope 01 and availability of perspective Management bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-177108-CW- RFQ / Management of exotic species-Removal of Lantana from target area (GCL Tikkri, Rehad, Sawagaon & Naugaon) Component 1. Sustainable Request for Single Stage - One 2020-12- = 14 Ha. by CRS method IBRD / 90410 Land and Water Resource Post Limited 5,912.00 5,657.38 Completed 2020-06-06 2020-02-15 2020-07-03 2020-02-17 Quotations Envelope 30 more than 75 to Management 100%.Keeping in view of low value and availability of perspective bidder, limited market approach was adopted IN-DPO, SOLAN-177114-CW- RFQ / Management of exotic species - Removal of Lantana from target area (GCL Component 1. Sustainable Dangeel, and Karog) = 20 Request for Single Stage - One 2021-01- IBRD / 90410 Land and Water Resource Post Limited 8,445.00 8,103.08 Completed 2020-06-06 2020-02-15 2020-07-06 2020-02-17 Ha.by CRS method ( more Quotations Envelope 02 Management than 75 to 100%). Keeping in view of low value and availability of perspective bidder, limited market approach was adopted. IN-DPO, SOLAN-177166-CW- RFQ / Lantana removal by CRS method (more than 75 to 100%) in UF 385 Beer ka Dul- Component 1. Sustainable 3 ha, GCL Bhamot 2 Ha UF Request for Single Stage - One 2021-01- IBRD / 90410 Land and Water Resource Post Limited 4,812.00 4,604.98 Completed 2020-06-06 2020-02-07 2020-07-07 2020-02-12 Bajthana 6.40Ha, and Quotations Envelope 03 Management UF386.Keeping in view of low value, limited market approach was adopted.This does not come under RF. IN-DPO, SOLAN-178384-CW- RFQ / Management of exotic species - Removal of Lantana from target area (GCL Component 1. Sustainable Jakhol= 15 Ha.) by CRS Request for Single Stage - One 2021-01- IBRD / 90410 Land and Water Resource Post Limited 6,336.00 6,077.31 Completed 2020-06-06 2020-02-11 2020-07-05 2020-02-14 method (more than 75 to Quotations Envelope 01 Management 100 %).Keeping in view of low value and availability of perspective bidder, limited market approach was adopted. IN-DPO, SOLAN-177170-CW- RFQ / Management of exotic species - Removal of Lantana from target area (Gadon and Component 1. Sustainable Dharmana = 16 Ha) by cut Request for Single Stage - One 2020-12- IBRD / 90410 Land and Water Resource Post Limited 6,759.00 6,465.58 Completed 2020-06-06 2020-02-11 2020-07-01 2020-02-15 root stock method.Keeping in Quotations Envelope 28 Management view of low value and availability of perspective bidder, limited market approach was adopted. IN-DPO, SOLAN-178235-CW- RFQ / Raising of seedling in 7 nurseries at different locations from October, 2020 onward for plantations in Component 1. Sustainable Pending Request for Single Stage - One 2021-03- 2021(multiple IBRD / 90410 Land and Water Resource Post Limited 62,400.00 0.00 Implementat 2020-09-20 2020-10-21 Quotations Envelope 31 contracts).Limited approach is Management ion adopted as the perspective bidders are available at different locations and also based on value of contract Page 2 IN-DPO, SOLAN-178238-CW- RFQ / Raising of plantations & planting of Grass tufts in the rainy season of 2020 (1100 plants/ha) . It involves Component 1. Sustainable Pending Request for Single Stage - One 2020-09- multiple contracts.Limited IBRD / 90410 Land and Water Resource Post Limited 90,259.00 0.00 Implementat 2020-06-25 2020-07-26 Quotations Envelope 09 approach is adopted as the Management ion perspective bidders are available at different locations and also based on value of contract. IN-DPO, SOLAN-178239-CW- RFQ / Raising of plantations in the rainy season of 2020 (800 plants/ha) . It involves Component 1. Sustainable Pending multiple contracts.Limited Request for Single Stage - One 2020-09- IBRD / 90410 Land and Water Resource Post Limited 80,533.00 0.00 Implementat 2020-06-25 2020-07-26 approach is adopted as the Quotations Envelope 19 Management ion perspective bidders are available at different locations and also based on value of contract. IN-DPO, SOLAN-178240-CW- RFQ / Raising of plantations in the rainy season of 2020 (400 plants/ha) . It involves Component 1. Sustainable Pending multiple contracts.Limited Request for Single Stage - One 2020-09- IBRD / 90410 Land and Water Resource Post Limited 55,500.00 0.00 Implementat 2020-06-25 2020-07-26 approach is adopted as the Quotations Envelope 14 Management ion perspective bidders are available at different locations and also based on value of contract. IN-DPO, SOLAN-178241-CW- RFQ / Fencing of plantation area along drainage line with wooden poles and barbed wire(1100 plants/ha).It Component 1. Sustainable Pending Request for Single Stage - One 2020-09- involves multiple IBRD / 90410 Land and Water Resource Post Limited 84,867.00 0.00 Implementat 2020-06-25 2020-07-26 Quotations Envelope 14 contracts.Limited approach is Management ion adopted as the perspective bidders are available at different locations and also based on value of contract IN-DPO, SOLAN-178242-CW- RFQ / Fencing of plantation area with wooden fence post and barbed wire (800 plants per/ha).These works will be Component 1. Sustainable Pending Request for Single Stage - One 2020-09- carried out at 22 different IBRD / 90410 Land and Water Resource Post Limited 95,633.00 0.00 Implementat 2020-06-25 2020-07-26 Quotations Envelope 09 locations (151 ha) in entire Management ion district and these sites are scattered & distance varies from 10-80 Kms (Multiple contracts) IN-DPO, SOLAN-178243-CW- RFQ / Fencing of plantation area with wooden fence post and barbed wire(400 plants per/ha).This activity involves Component 1. Sustainable Pending Request for Single Stage - One 2020-09- multiple contracts.Limited IBRD / 90410 Land and Water Resource Post Limited 117,167.00 0.00 Implementat 2020-06-25 2020-07-26 Quotations Envelope 09 approach is adopted as the Management ion perspective bidders are available at different locations and also based on value of contract. IN-DPO, SOLAN-178245-CW- RFQ / Treatment of Drainage Line (Soil Conservation Works) by constructing Vegetative check barriers, Dry stone Component 1. Sustainable Pending Request for Single Stage - One 2021-02- check barriers, Create Wire IBRD / 90410 Land and Water Resource Post Limited 353,880.00 0.00 Implementat 2020-08-25 2020-09-25 Quotations Envelope 22 check barriers, CC check Management ion barriers. Includes multiple contracts which ranges from Rs 3 lakh to 4.5 Lakh (4300- 6500 $) IN-DPO, SOLAN-178246-CW- RFQ / Renovation and improvement of already existing Natural Water Sources Component 1. Sustainable Pending (springs).There will be 5 Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 16,670.00 0.00 Implementat 2020-09-25 2020-10-26 multiple contracts /RFQs for Quotations Envelope 25 Management ion renovation/maintenance of 10 water springs at different locations having contract value of approx. 3400 $. IN-DPO, SOLAN-178247-CW- RFQ / Management of exotic species by cleaning of lantana. It involves multiple Component 1. Sustainable Pending Request for Single Stage - One 2021-02- contracts. Limited approach is IBRD / 90410 Land and Water Resource Post Limited 90,860.00 0.00 Implementat 2020-10-10 2020-11-10 Quotations Envelope 08 adopted as the perspective Management ion bidders are available at different locations and also based on value of contract. IN-DPO, SOLAN-178881-CW- RFQ / Contour trenching in plantation area including grass seeding at 19 locations Component 1. Sustainable Pending Request for Single Stage - One 2020-11- in the entire IBRD / 90410 Land and Water Resource Post Limited 56,450.00 0.00 Implementat 2020-06-25 2020-08-20 Quotations Envelope 18 district.Cumulative value of Management ion this activity involves multiple contracts based on low value and small minor labor works Page 3 IN-DPO, SOLAN-178926-CW- RFQ / Construction of 40 ponds (manual excavation) at different locations (3 APO units) in two phases i.e. Component 1. Sustainable Pending Request for Single Stage - One 2021-07- during December 2020(20 IBRD / 90410 Land and Water Resource Post Limited 172,000.00 0.00 Implementat 2020-10-06 2020-12-01 Quotations Envelope 29 ponds) and may 2021 (20 Management ion ponds). The estimated cost of each pond is approx. Rs 3 lakh (4300 $) .It involves Multiple contracts IN-DPO, SOLAN-178971-CW- RFQ / Maintenance of Component 1. Sustainable Seedlings raised in different Request for Single Stage - One 2020-07- IBRD / 90410 Land and Water Resource Post Limited 30,000.00 30,552.03 Completed 2020-06-11 2020-01-22 2020-06-29 2020-02-17 nurseries. This activity Quotations Envelope 29 Management involves multiple contracts with limited approach. IN-DPO, SOLAN-178975-CW- RFQ / Maintenance of Nurseries & Seedlings needs to be raised during December Component 1. Sustainable Pending Request for Single Stage - One 2021-08- 2020.There will be multiple IBRD / 90410 Land and Water Resource Post Limited 50,000.00 0.00 Implementat 2020-12-19 2021-02-13 Quotations Envelope 12 contracts.Keeping in view of Management ion low value and availability of perspective bidder, limited market approach was adopted. IN-DPO, SOLAN-184410-CW- RFQ / Removal of Lantana from UPF Harth 24 Ha by CRS method (more than 75 to Component 1. Sustainable 100%) under APO Unit Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 10,130.00 9,720.01 Completed 2020-07-20 2020-02-07 2020-08-14 2020-02-12 Dharampur.Keeping in view of Quotations Envelope 10 Management low value and availability of perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-210678-CW- RFQ / Ist Year Maintenance of Lantana /invasive alien species area. It involves Component 1. Sustainable Pending multiple contracts. Limited Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 8,700.00 0.00 Implementat 2020-12-18 2021-01-13 approach is adopted as the Quotations Envelope 31 Management ion perspective bidders are available at different locations and also based on value of contract. IN-DPO, SOLAN-210682-CW- RFQ / Construction of primary water harvesting and storage structure at different locations Component 1. Sustainable Pending Request for Single Stage - One 2021-03- in different Gram Panchayats . IBRD / 90410 Land and Water Resource Post Limited 324,290.00 0.00 Implementat 2020-12-31 2021-01-27 Quotations Envelope 31 It involves approximately 46- Management ion 48 contracts and value of each contract is less than Rs 500000/-(Five Lac) IN-DPO, SOLAN-231348-CW- RFQ / Plantation of 1100 plants per/ha) along Drainage Component 1. Sustainable Request for Pending Request for Single Stage - One 2021-10- lines areas in (57 ha) different IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 67,500.00 0.00 Implementat 2021-06-19 2021-07-21 Quotations Envelope 25 GPS alongwith planting of Management Bank-SPD) ion Grass tuffs in the rainy season of 2021. IN-DPO, SOLAN-231349-CW- RFQ / 1st year Maintenance of Plantations along drainage line 1100 plants per/ha area Component 1. Sustainable Request for Pending in (133 Ha), Re-afforestation Request for Single Stage - One 2021-10- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 64,000.00 0.00 Implementat 2021-06-19 2021-07-21 plantations 800 plants per/ha Quotations Envelope 25 Management Bank-SPD) ion area in (155 ha), and Enrichment plantations area per/ha in 182 Ha. (Total 470 Ha) IN-DPO, SOLAN-231350-CW- RFQ / Contour trenching in plantation area (217 Ha) Request for including grass seeding at Component 1. Sustainable Quotations - Small Pending different locations in the Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Works 50,000.00 0.00 Implementat 2021-09-19 2021-10-20 entire district. Cumulative Quotations Envelope 26 Management (Emergency) SPD - ion value of this activity involves Competitive multiple contracts based on low value and small minor labour works IN-DPO, SOLAN-231351-CW- RFQ / Ist Year Maintenance of Lantana /invasive alien species area in 176 ha. It Component 1. Sustainable Request for Pending involves multiple contracts. Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 16,000.00 0.00 Implementat 2021-06-19 2021-07-18 Limited approach is adopted Quotations Envelope 25 Management Bank-SPD) ion as the perspective bidders are available at different locations and also based on value of contract. IN-DPO, SOLAN-231353-CW- RFQ / 2nd Year Maintenance of Lantana /invasive alien species area in 118 ha. It Component 1. Sustainable Request for Pending involves multiple contracts. Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 9,200.00 0.00 Implementat 2021-06-19 2021-07-16 Limited approach is adopted Quotations Envelope 18 Management Bank-SPD) ion as the perspective bidders are available at different locations and also based on value of contract. Page 4 IN-DPO, SOLAN-231347-CW- RFQ / Plantation of Enrichment areas 400 plants per/ha in 115 Ha in different GPs in the rainy season of Component 1. Sustainable Request for Pending Request for Single Stage - One 2021-10- 2021. These activity involves IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 98,000.00 0.00 Implementat 2021-06-19 2021-07-21 Quotations Envelope 25 multiple contracts. Limited Management Bank-SPD) ion approach is adopted as the perspective bidders are available at different locations. IN-DPO, SOLAN-237510-CW- RFQ / Plantation of 800 Plants per/ha in Re-afforestation areas in (102 Ha) in different Component 1. Sustainable Request for Pending GPs in rainy season of 2021. Request for Single Stage - One 2021-10- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 98,900.00 0.00 Implementat 2021-06-19 2021-07-21 These activity involves Quotations Envelope 25 Management Bank-SPD) ion multiple contracts. Limited approach is adopted as the perspective bidders are available at different locations GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-DPO, SOLAN-176088-GO- RFQ / Black Recycled Poly Bags 5' x 9' of 250 Gauge double sealed with six holes Component 1. Sustainable in 2 rows of 3 holes in each in Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 5,512.00 5,176.47 Completed 2020-06-02 2020-01-14 2020-06-30 2020-07-04 2020-08-20 2020-07-16 the lower 2 by 3 portion, Dia. Quotations Envelope Management of hole 3 mm.Keeping in view of low value and availability of perspective bidder, limited market approach was adopted IN-DPO, SOLAN-177520-GO- RFQ / Procurement of Seeds of Different Native Forestry Tree Species for the year 2019- Component 1. Sustainable Request for Single Stage - One 20.Keeping in view of low IBRD / 90410 Land and Water Resource Post Limited 2,490.00 2,166.77 Completed 2020-06-08 2020-02-01 2020-07-08 2020-03-03 2020-08-25 2020-03-03 Quotations Envelope value and availability of Management perspective bidder, limited market approach was adopted. This does not come under RF. IN-DPO, SOLAN-210675-GO- RFQ / Black Recycled Poly Bags 5' x 9' of 250 Gauge double sealed with six holes Component 1. Sustainable Pending in 2 rows of 3 holes in each in Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 7,300.00 0.00 Implementati 2020-12-22 2021-02-03 2021-04-24 the lower 2 by 3 portion, Dia. Quotations Envelope Management on of hole 3 mm.Keeping in view of low value and availability of perspective bidder, limited market approach was adopted IN-DPO, SOLAN-210683-GO- RFQ / Procurement of Agriculture Seed, Pesticides, Fertilizers etc. for Agriculture Component 2. Improved Pending Demonstration at different Request for Single Stage - One IBRD / 90410 Agricultural Productivity and Post Limited 4,300.00 0.00 Implementati 2020-12-23 2021-01-12 2021-03-31 locations in different GPs. Quotations Envelope Value Addition on These demonstration will be done on the land of farmers. These demonstrations are for vegetable crops. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 Plan de Passation de marchés I. Généralités 1. L'information sur le projet : Pays : Madagascar ; Emprunteur : République de Madagascar ; Nom de projet : Projet Filets Sociaux de Sécurité – Financement Additionnel (P160 544) ; Numéro du Crédit : D1450-MG ; Agence d’exécution du Projet : Unité Programme National de Nutrition Communautaire. 2. Date d’approbation du Plan de passation de marchés par la Banque : - ; Révision : - ; 3. Date de notification du Plan Général de Passation de marchés : - ; 4. Période couverte par le Plan de Passation de marchés : DOUZE (12) mois. II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable : Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le paragraphe 3.1 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) et sur la base de l'évaluation de la capacité de l'agence d’exécution : Seuil de Méthode de Passation de revue à Commentaires marchés priori (USD) Les montants 1 Biens : AOI/AON/UN/ED 2 000 000 estimatifs des marchés prévus 2 Travaux : AOI/AON/ED 10 000 000 sont au-dessous des seuils. Niveau de Services autres que 3 2 000 000 risque : consultants : AOI/AON/UN/ED « SUBSTANTIEL » 2. Pré-qualification (selon les dispositions des paragraphes 6.19 à 6.24 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable. 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 6.52 et 6.53 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Manuels en cours de mise à jour 5. Tout autre arrangement spécial en passation de marchés : Non Applicable. 6. Allotissement de fournitures avec méthodes et calendrier : [Enumérer d’abord les allotissements qui nécessitent la revue préalable de la Banque, ensuite les autres allotissements] 1 2 3 4 5 6 7 8 9 Réf. No Description Contrat Approche/Méthod Revue de la Coût Pré- Préféren Date Commentaire e de sélection Banque (à estimatif qualificati ce prévue s priori / à (USD) on nationale d’ouverture posteriori) Oui / Non Oui / Non des soumission s Lot 1 : N°9 : Impression et Achevée multiplication de bulletins LIMITE 01 A.11 COT Post 12 000,00 NON NON 21-juin-18 Lot 2 : N°10 : en périodiques (02 numéros NATIONAL attente semestrielles) Maquette Acquisition outils de LIMITE Ordre de Service 03 A.11 COT Post 10 000,00 NON NON 13-mai-18 communication (Pagnes) NATIONAL signé Acquisition divers Pas encore LIMITE 04 A.17 équipements et mobiliers COT Post 5 000,00 NON NON 14-févr-19 lancée NATIONAL de bureau A programmer Acquisition de 293,2 SELECTION 1 475 246 Nouvelle activité 05 A.13 ED Post NON NON 12-févr-19 tonnes de Plumpy Sup DIRECTE ,46 PTA 2019 Acheminement vers LIMITE Nouvelle activité 06 A.13 Districts de 293,2 tonnes COT Post 77 644,55 NON NON 19-févr-19 NATIONAL PTA 2019 de Plumpy Sup Confection d’outils pour les sites : impression et LIMITE Nouvelle activité A.6.0 COT Post 11 812,50 NON NON 04-juin-19 livraison d’outils de NATIONAL PTA 2019 gestion : Registres Confection de plaques d'indication des sites et A.11.0 Supports de LIMITE Nouvelle activité COT Post 27 514,03 NON NON 04-juin-19 .1 communication : NATIONAL PTA 2019 Impression plaque, livrets et bulletins périodiques 1 2 3 4 5 6 7 8 9 Réf. No Description Contrat Approche/Méthod Revue de la Coût Pré- Préféren Date Commentaire e de sélection Banque (à estimatif qualificati ce prévue s priori / à (USD) on nationale d’ouverture posteriori) Oui / Non Oui / Non des soumission s Confection de Pagnes et A.11.0 T-shirt, Blouses pour LIMITE 17 578,13 Nouvelle activité .2 COT Post NON NON 04-juin-19 intervenants (Reny NATIONAL PTA 2019 mavitrika, …) Acquisition de matériels informatiques adaptés à l'actualisation du SIG et LIMITE Nouvelle activité A.14 COT Post 13 312,50 NON NON 04-juin-19 du développement du NATIONAL PTA 2019 Géoportail des données en ligne III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans le paragraphe 3 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) : Méthode de sélection Seuil de Commentaires revue à priori (USD) 1. Méthode compétitive (firmes) 1 000 000 Les montants 2. Entente directe (firmes) 1 000 000 estimatifs des 3. Méthode compétitive (Consultant 300 000 contrats prévus individuel) sont au-dessous 4. Entente directe (Consultant 300 000 des seuils. individuel) Niveau de risque : « SUBSTANTIEL » 2. Liste restreinte composée entièrement de consultants nationaux : Selon les dispositions du paragraphe 7.25 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016), la liste restreinte de consultants peut comporter entièrement des consultants nationaux pour les cas suivants : Catégorie de Montant estimatif consultant 1. Firmes Inférieur à USD 300 000 2. Consultants individuels Inférieur à USD 100 000 3. Tout autre arrangement spécial de Sélection de consultants : Non applicable 4. Tâches de consultation avec des méthodes de sélection et calendrier 1 2 3 4 5 6 7 Réf. No Description des missions Approche/Méth Revue de la Coût Date Commentaires ode de Banque (à estimatif prévue de sélection priori / à (USD) soumission posteriori) s des proposition s Consultant en charge de la maintenance Nouvelle activité PTA 01 A.14 ED ED Post 12 000,00 29-avril-19 du système Géoportail 2019 Consultants chargés de saisie des Nouvelle activité PTA 02 A.16 Registres des sites ED ED Post 34 321,33 20-mai-19 2019 Consultant Individuel en charge de Nouvelle activité PTA 03 B.2 l’élaboration de l’ICR INDV ED Post 5 000,00 21-mai-19 2019 IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier 1. Dans cette section, les activités de renforcement de capacité acceptées (quelques articles pourraient être des recommandations de CPAR) sont énumérées avec le calendrier No. Résultats Coût Durée Date de Commentaires escomptés / estimatif estimative début Description de l’activité PROCUREMENT Madagascar : Improving Nutrition Outcomes using the Multiphase Programmatic Approach PLAN General Information Country: Madagascar Bank’s Approval Date of the Original Procurement Plan: 2017-11-15 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160848 GPN Date: 2020-09-07 Project Name: Improving Nutrition Outcomes using the Multiphase Programmatic Approach Loan / Credit No: IDA / V0970, IDA / D2570 Community Nutrition National Program Unit Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Amount Amount Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned UPNNC 3 25 DC TRX / Travaux d'extension du Project Management, Request for Single Stage - One 2018-04- Bureau de l'Unité de IDA / V0970 Capacity Building and Post Limited 45,000.00 34,783.92 Completed 2017-11-08 2017-11-20 2017-12-27 2018-03-27 Quotations Envelope 26 Coordination de Projet - Operations Support Ministère de la Santé Publique à Ambohimiandra MG-UPNNC-233827-CW-RFB / Sélection d'entreprise pour Request for Bids - les travaux de réhabilitation, Project Management, Pending Single Stage - One Small Works SPD 2022-04- d'extension et de surélévation IDA / D2570 Capacity Building and Post Request for Bids Open - National 450,000.00 0.00 Implementat 2021-08-03 2021-08-08 2021-09-20 2021-10-04 2021-11-01 Envelope (1 envelope 30 d'un bâtiment public pour Operations Support ion process) servir de bureau à l'UPNNC et l'ONN GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UPNNC 2 1 ET 2 2 UNOPS / Acquisition de divers matériels informatiques, bureautiques et de Strengthen capacity to communication (23 UN Agencies IDA / V0970 manage and deliver the Post Direct 272,000.00 316,648.00 Signed 2017-11-10 2017-11-15 2017-12-21 2017-12-27 2018-04-12 2018-03-27 Ordinateurs de bureau avec (Direct) RMCHN minimum package onduleurs, 28 ordinateurs portables, 22 photocopieuses, 22 vidéoprojecteurs et 92 tablettes UPNNC 2 1 ET 2 3 AON / Acquisition kits de Strengthen capacity to communication pour le Single Stage - One IDA / V0970 manage and deliver the Post Request for Bids Open - National 166,000.00 92,426.63 Completed 2017-11-12 2018-02-07 2017-11-17 2017-12-15 2018-03-07 2018-01-12 2018-05-22 2018-02-09 2018-06-13 2018-04-10 2018-09-05 Ministère de la Santé Publique Envelope RMCHN minimum package : Kit vidéoconférence et kit central de communication UPNNC 3 1 DC / Strengthen capacity to Request for Single Stage - One Multiplication et diffusion de IDA / V0970 manage and deliver the Post Limited 86,000.00 2,961.47 Signed 2017-11-05 2018-01-18 2017-12-24 2018-03-23 2018-02-22 2018-05-18 Quotations Envelope PNAN III RMCHN minimum package UPNNC 3 2 AON / Acquisition Strengthen capacity to Single Stage - One supports de diffusion de IDA / V0970 manage and deliver the Post Request for Bids Open - National 245,000.00 63,185.88 Signed 2017-11-03 2018-01-27 2017-11-08 2017-12-06 2018-02-27 2018-01-03 2018-03-28 2018-01-31 2018-05-02 2018-04-01 Envelope document cadre RMCHN minimum package PARN UPNNC 1 6 UNICEF / Acquisition de matériels et Strengthen capacity to UN Agencies équipements pour la mise en IDA / D2570 manage and deliver the Post Direct 900,000.00 620,630.00 Signed 2018-05-14 2018-06-07 2018-05-28 2018-06-07 2018-07-02 2018-06-20 2018-08-31 (Direct) place des sites RMCHN minimum package communautaires PARN UPNNC 16 27 UNOPS1 / Scale up coverage and Acquisition de motos pour les UN Agencies IDA / D2570 utilization of the RMCHN Post Direct 1,200,000.00 1,135,115.00 Signed 2018-05-07 2018-06-06 2018-05-21 2018-06-06 2018-07-02 2018-06-26 2018-09-30 Animateurs et ES auprès (Direct) minimum package UNOPS PARN UPNNC 27 31 UNOPS2 / Strengthen capacity to Acquisition de véhicules de UN Agencies IDA / D2570 manage and deliver the Post Direct 275,000.00 249,715.01 Signed 2018-05-07 2018-06-06 2018-05-21 2018-06-06 2018-07-02 2018-06-26 2018-09-30 supervision pour les ORN et (Direct) RMCHN minimum package l'UPNNC auprès de l'UNOPS PARN UPNNC 24 27 31 UNOPS1 / Acquisition de Scale up coverage and UN Agencies matériels informatiques, IDA / D2570 utilization of the RMCHN Post Direct 300,000.00 295,744.00 Signed 2018-05-07 2018-06-06 2018-05-21 2018-06-06 2018-07-02 2018-08-14 2018-09-30 (Direct) bureautiques et de minimum package communication auprès UNOPS PARN UPNNC 16 AON01 / Strengthen capacity to Single Stage - One Acquisition de radio destinés IDA / D2570 manage and deliver the Post Request for Bids Open - National 100,000.00 63,982.54 Signed 2018-05-01 2018-08-25 2018-05-15 2018-06-12 2018-10-10 2018-06-26 2019-01-22 2018-07-17 2019-03-22 2018-09-15 2019-06-17 Envelope aux sites communautaires RMCHN minimum package PARN UPNNC 1 6 SUPPORT COM / Confection supports de Strengthen capacity to Single Stage - One communication répartis en IDA / D2570 manage and deliver the Post Request for Bids Open - National 200,000.00 153,223.74 Signed 2018-08-06 2018-08-25 2018-08-20 2018-09-17 2018-09-26 2018-10-01 2019-02-13 2018-10-22 2019-03-22 2018-12-21 Envelope cinq (05) lots (Banderoles, Tee- RMCHN minimum package shirts, Pagnes, ...) PARN UPNNC 1 6 SUPPORT COM2 / Impression et Strengthen capacity to multiplication divers supports Request for Single Stage - One IDA / D2570 manage and deliver the Post Limited 65,000.00 5,971.68 Signed 2018-09-02 2019-06-25 2018-10-21 2019-10-16 2018-12-20 de communication répartis en Quotations Envelope RMCHN minimum package trois (03) lots (Affiches, Guides, Bulletins périodiques) PARN UPNNC 2 4 OUTILS DE GESTION / Impression et Scale up coverage and Request for Single Stage - One multiplication des outils de IDA / D2570 utilization of the RMCHN Post Limited 70,000.00 26,344.31 Signed 2018-05-15 2019-01-07 2018-07-03 2019-01-31 2018-07-31 Quotations Envelope gestion répartis en deux (02) minimum package lots (Registres) PARN UPNNC 3 1 MOB Project Management, Request for Single Stage - One BUREAU / Acquisition de IDA / D2570 Capacity Building and Post Limited 6,000.00 5,149.31 Signed 2018-05-27 2019-11-05 2018-07-15 2019-11-21 2018-08-14 Quotations Envelope mobiliers de bureau Operations Support Page 1 PARN UPNNC 1 6 SUPPORT Strengthen capacity to COM3 / Confection et Request for Single Stage - One IDA / D2570 manage and deliver the Post Limited 35,000.00 0.00 Canceled 2018-08-21 2018-10-16 2018-12-15 multiplication calendriers Quotations Envelope RMCHN minimum package 2019 PARN UPNNC 1 6 BALANCES / Strengthen capacity to Acquisition de balances pèse- Request for Single Stage - One IDA / D2570 manage and deliver the Post Limited 100,000.00 0.00 Canceled 2018-05-22 2018-07-17 2018-09-15 personne destinées aux sites Quotations Envelope RMCHN minimum package communautaires MG-UPNNC-93276-GO-DIR / Scale up coverage and Acquisition de matériels UN Agencies IDA / D2570 utilization of the RMCHN Post Direct 450,000.00 350,213.45 Signed 2018-12-29 2018-05-28 2018-12-30 2018-11-27 2019-01-09 2018-12-10 2019-07-08 destinés aux sites (Pèse- (Direct) minimum package personnes) MG-UPNNC-93277-GO-RFQ Scale up coverage and / Acquisition de piles Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Limited 60,000.00 0.00 Canceled 2019-01-17 2019-03-14 2019-05-28 rechargeables pour les Pèse- Quotations Envelope minimum package personne PARN UPNNC 11 LNS / Acquisition de suppléments Strengthen capacity to alimentaires LNS riches en IDA / D2570 manage and deliver the Prior Direct Selection Direct 1,188,074.00 1,286,399.27 Signed 2019-01-10 2019-11-01 2019-01-17 2019-11-06 2019-02-14 2019-12-27 2020-02-09 protéines et lipides pour les RMCHN minimum package enfants 6 à 18 mois PARN UPNNC 13 PLUMPY / Strengthen capacity to Acquisition d'aliments IDA / D2570 manage and deliver the Post Direct Selection Direct 935,299.00 794,644.66 Signed 2019-01-10 2019-01-29 2019-02-07 2019-01-28 2019-03-21 2019-02-14 2020-03-15 thérapeutiques Plumpy Sup RMCHN minimum package pour traiter le cas de MAM MG-UPNNC-1 1 06 02- OUTILS COMM / Production et livraison des Outils de communication Scale up coverage and Single Stage - One Institutionnelle repartis en 5 IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 160,000.00 0.00 Canceled 2019-07-01 2019-07-06 2019-08-05 2019-09-04 2019-09-25 2019-12-24 Envelope lots (Stylo flash, Stylo minimum package personnalisé- Affiche offre de services, Blouse sans manche, Tee-shirts FAFY) MG-UPNNC-1 1 06 02- OUTILS DE COMMUNICATI / Scale up coverage and Production et livraison des Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Limited 10,000.00 2,232.12 Signed 2019-06-05 2019-02-27 2019-06-29 2019-05-02 2019-07-14 outils de communication Quotations Envelope minimum package institutionnelle (Agenda et blocs note) MG-UPNNC-110602-OUTILS Scale up coverage and Request for Single Stage - One COMM / Confection des IDA / D2570 utilization of the RMCHN Post Limited 87,000.00 32,636.06 Signed 2019-06-13 2019-06-21 2019-07-07 2019-06-25 2019-09-05 Quotations Envelope plaques pour les sites minimum package MG-UPNNC-2 1 01 04- DOCUMENT DE FORMATION / Travaux d'impression des Strengthen capacity to Request for Single Stage - One documents de formation AC IDA / D2570 manage and deliver the Post Limited 16,000.00 15,438.71 Signed 2019-06-06 2019-03-04 2019-06-28 2019-03-05 2019-07-08 Quotations Envelope (document formateur, RMCHN minimum package document participant et courbes de croissance) MG-UPNNC-154719-GO-DIR / Acquérir des matériels et équipements informatiques, imprimante multifonction, tablettes pour les Animateurs Strengthen capacity to UN Agencies de la Région Bongolava et IDA / D2570 manage and deliver the Post Direct 375,000.00 374,327.00 Signed 2020-02-24 2019-10-25 2020-03-02 2019-12-16 2020-03-23 2019-12-27 2020-09-19 (Direct) pour la communication RMCHN minimum package institutionnelle, matériels techniques pour la communication, matériels de communication MG-UPNNC-154727-GO-DIR / Acquérir un véhicule pour Strengthen capacity to UN Agencies ORN Bongolava et des motos IDA / D2570 manage and deliver the Post Direct 177,626.00 374,327.00 Signed 2020-02-10 2019-10-25 2020-02-17 2019-10-16 2020-03-09 2019-12-27 2020-09-05 (Direct) pour Animateurs et ES de la RMCHN minimum package Région Bongolava MG-UPNNC-154750-GO-DIR Scale up coverage and / Acquérir des matériels UN Agencies IDA / D2570 utilization of the RMCHN Post 164,926.00 83,634.60 Signed 2020-02-24 2019-09-11 2020-03-02 2019-11-11 2020-03-09 2019-11-11 2020-09-05 anthropométriques pour les (Direct) minimum package sites de la région Bongolava MG-UPNNC-154769-GO-RFB Strengthen capacity to / Impression et multiplication Single Stage - One IDA / D2570 manage and deliver the Post Request for Bids Open - National 135,000.00 27,978.36 Completed 2020-02-24 2020-01-14 2020-03-02 2020-04-01 2020-02-06 2020-04-15 2020-02-14 2020-05-02 2020-04-22 2020-07-01 2020-06-05 de des feuillets d'animation et Envelope RMCHN minimum package des bâches alimentaires MG-UPNNC-156503-GO-RFP / IMPRESSION ET LIVRAISON Strengthen capacity to Request for Single Stage - Two DE DEPLIANTS GUIDE DE IDA / D2570 manage and deliver the Post Limited 15,400.00 0.00 Canceled 2020-02-24 2020-03-02 2020-03-17 2020-03-31 2020-04-17 2020-10-14 Proposals Envelope MESSAGE ET AFFICHES RMCHN minimum package REPARTIS EN DEUX (02) LOTS MG-UPNNC-152791-GO-RFQ Strengthen capacity to / Acquérir des registres pour Request for Single Stage - One IDA / D2570 manage and deliver the Post Limited 4,297.00 0.00 Canceled 2020-03-02 2020-04-06 2020-05-19 les sites de la Région de Quotations Envelope RMCHN minimum package Bongolava MG-UPNNC-174129-GO-DIR / Acquisition des aliments thérapeutiques Plumpy sup Scale up coverage and pour les 7 régions ( Itasy, IDA / D2570 utilization of the RMCHN Prior Direct Selection Direct 5,543,428.00 3,925,665.69 Signed 2020-08-03 2020-10-15 2020-08-10 2020-11-05 2020-10-07 2020-12-15 2021-04-05 Vakinakaratra, Amoron'i minimum package Mania, Haute Matsiatra, Bongolava, Anlamanga, Alaotra Mangoro) MG-UPNNC-173972-GO-DIR / Acquisition des suppléments Scale up coverage and alimentaires LNS riches en IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 593,492.00 1,286,894.53 Signed 2020-08-03 2019-11-01 2020-08-17 2019-11-18 2020-10-14 2019-12-26 2021-04-12 protéeines et lipides pour la minimum package région Itasy MG-UPNNC-181784-GO-RFB Scale up coverage and / Fourniture et livraison de 2 Single Stage - One IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 73,000.00 59,981.37 Signed 2020-07-27 2020-06-24 2020-08-03 2020-09-02 2020-08-14 2020-09-17 2020-09-04 2020-10-04 2020-11-03 2020-12-03 440 Radios solaires pour les Envelope minimum package sites. Page 2 MG-UPNNC-186046-GO-UN / Acquisition des matériels informatiques pour les Strengthen capacity to UN Agencies régions Analamanga et IDA / D2570 manage and deliver the Post Direct 24,500.00 0.00 Canceled 2020-09-01 2020-08-03 2020-09-08 2020-11-21 2022-05-15 (Direct) Alaotra Mangoro (Lap top, RMCHN minimum package Imprimante et vidéo projecteur) MG-UPNNC-199566-GO-UN / Acquisition des mobiliers et Scale up coverage and des matériels pour sites : 10 UN Agencies IDA / D2570 utilization of the RMCHN Prior Direct 2,500,000.00 0.00 Canceled 2020-11-16 2020-12-16 2021-02-14 2021-05-15 622 Tables, 21 244 Chaises, (Direct) minimum package kits de matériels de mesures anthropométriques MG-UPNNC-174121-GO-UN / Acquisition de 2 139 Scale up coverage and UN Agencies armoires métalliques pour les IDA / D2570 utilization of the RMCHN Post Direct 400,000.00 0.00 Canceled 2020-07-27 2020-08-03 2020-08-03 2020-09-19 2022-03-13 (Direct) régions Analamanga et minimum package Alaotra Mangoro MG-UPNNC-173960-GO-UN / Acquisition de 366 tablettes Strengthen capacity to UN Agencies pour les animateurs des IDA / D2570 manage and deliver the Post Direct 172,695.00 0.00 Canceled 2020-07-27 2020-08-03 2020-08-03 2020-08-06 2020-10-16 2022-04-09 (Direct) régions Analamange et RMCHN minimum package Alaotra Mangoro MG-UPNNC-173975-GO-UN / Acquisition des Motos pour Scale up coverage and UN Agencies les régions Analamanga et IDA / D2570 utilization of the RMCHN Post Direct 1,064,452.00 0.00 Canceled 2020-07-27 2020-08-03 2020-08-03 2019-10-14 2020-09-14 2021-03-13 (Direct) Alaotra Mangoro (Animateurs minimum package et ES) MG-UPNNC-174122-GO-UN / Acquisition de 02 véhicules Strengthen capacity to UN Agencies 4x4 tout terrain pour les IDA / D2570 manage and deliver the Post Direct 92,000.00 0.00 Canceled 2020-07-27 2020-08-03 2020-08-03 2020-08-06 2020-10-16 2022-04-09 (Direct) régions Analama,ga et Alaotra RMCHN minimum package Mangoro MG-UPNNC-202074-GO-UN Strengthen capacity to Under / Acquisition de matériels UN Agencies IDA / D2570 manage and deliver the Post Direct 1,156,450.00 0.00 Implementati 2021-01-01 2021-01-15 2021-02-26 2021-05-28 roulants : véhicules tout (Direct) RMCHN minimum package on terrain et motos MG-UPNNC-203413-GO-UN / Acquisition des matériels informatiques (02 ordinateurs Scale up coverage and Pending portables, 02 imprimantes UN Agencies IDA / D2570 utilization of the RMCHN Post Direct 145,000.00 0.00 Implementati 2021-01-01 2021-01-31 2021-04-03 2021-08-06 multifonction, 02 vidéos (Direct) minimum package on projecteurs, 366 tablettes) pour les régions Analamanga et Alaotra Mangoro PARN UPNNC 16 AON02 / Strengthen capacity to Pending Single Stage - One Acquisition de kits pour IDA / D2570 manage and deliver the Post Request for Bids Open - National 300,000.00 0.00 Implementati 2021-01-25 2021-02-08 2021-03-08 2021-03-22 2021-04-19 2021-06-03 Envelope démonstration culinaire RMCHN minimum package on PARN UPNNC 3 1 KIT SONO / Project Management, Pending Request for Single Stage - One Acquisition d'un kit de IDA / D2570 Capacity Building and Post Limited 5,000.00 0.00 Implementati 2021-02-08 2021-03-29 2021-05-28 Quotations Envelope sonorisation Operations Support on MG-UPNNC-154740-GO-RFQ Strengthen capacity to Request for Single Stage - One / Imprimer des documents de IDA / D2570 manage and deliver the Post Limited 345,287.00 56,046.16 Signed 2020-12-28 2020-09-25 2021-01-25 2021-02-03 2021-02-24 Quotations Envelope formation PCIME RMCHN minimum package MG-UPNNC-216420-GO-RFQ Project Management, Pending / Acquisition de 05 Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 20,119.00 0.00 Implementati 2021-03-08 2021-04-12 2021-05-12 Ordinateurs portables pour Quotations Envelope Operations Support on l'Entité de Coordination MG-UPNNC-216421-GO-RFQ / Acquisition des Project Management, Pending Request for Single Stage - One consomptibles informatiques IDA / D2570 Capacity Building and Post Limited 7,400.00 0.00 Implementati 2021-03-01 2021-04-05 2021-05-05 Quotations Envelope et accessoires pour l'Entité de Operations Support on Coordination MG-UPNNC-173973-GO-UN / Acquisition des mesures Scale up coverage and UN Agencies anthropométriques pour les IDA / D2570 utilization of the RMCHN Prior Direct 3,505,727.00 0.00 Canceled 2020-07-27 2021-02-04 2020-08-03 2021-02-19 2020-08-25 2021-02-21 (Direct) régions Alaotra Mangoro et minimum package Analamanga MG-UPNNC-154774-GO-DIR Scale up coverage and UN Agencies / Acquérir des mobiliers pour IDA / D2570 utilization of the RMCHN Post Direct 844,000.00 0.00 Canceled 2020-12-28 2021-01-04 2021-01-25 2021-07-24 (Direct) les sites minimum package MG-UPNNC-181777-GO-UN / Acquisition des mobiliers Scale up coverage and UN Agencies pour site: IDA / D2570 utilization of the RMCHN Post Direct 370,000.00 0.00 Canceled 2021-01-25 2021-02-01 2021-02-22 2021-08-21 (Direct) 10 622 Tables minimum package 21 244 Chaises MG-UPNNC-222712-GO-UN / Acquisition de mobiliers Scale up coverage and Pending UN Agencies pour les sites des 7 régions: IDA / D2570 utilization of the RMCHN Post Direct 891,000.00 0.00 Implementati 2021-04-19 2021-05-03 2021-05-24 2021-11-20 (Direct) - 8 524 Tables minimum package on - 17 048 Chaises MG-UPNNC-222708-GO-UN / Acquisition de 1 584 Scale up coverage and Pending UN Agencies Armoires métalliques pour IDA / D2570 utilization of the RMCHN Post Direct 380,000.00 0.00 Implementati 2021-04-26 2021-05-10 2021-05-31 2021-11-27 (Direct) Analamanga, Alaotra minimum package on Mangoro, Bongolava MG-UPNNC-222198-GO-UN / Acquisition des matériels de Scale up coverage and UN Agencies mesures anthropométriques IDA / D2570 utilization of the RMCHN Post Direct 360,000.00 338,142.33 Signed 2021-03-22 2021-01-04 2021-04-05 2021-01-06 2021-05-10 2021-03-26 2021-11-06 (Direct) pour les régions Analamanga minimum package et Alaotra Mangoro NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 MG-UPNNC-181754-NC-RFB / Confection, impression et livraison des outils de communications: lot 1:Tee-shirts, lot 2: Casquettes Strengthen capacity to Single Stage - One lot 3: Banderoles IDA / D2570 manage and deliver the Post Request for Bids Open - National 205,736.00 91,092.95 Signed 2020-08-03 2020-06-24 2020-08-10 2020-09-09 2020-08-14 2020-09-23 2020-09-04 2020-10-24 2020-10-15 2020-12-28 Envelope lot 4: Pagnes RMCHN minimum package lot 5: Polos lot 6: Chapeaux Bob lot 7:Sacs à dos lot 8: Masques caches bouches MG-UPNNC-184858-NC-RFB / Impression et livraison des Strengthen capacity to registres SPC et PECMAM pour Single Stage - One IDA / D2570 manage and deliver the Post Request for Bids Open - National 400,000.00 26,211.11 Signed 2020-08-03 2020-05-18 2020-08-10 2020-09-09 2020-06-05 2020-09-16 2020-06-29 2020-10-03 2020-07-22 2021-04-01 les 7 régions (Enimbolana Envelope RMCHN minimum package voalohany et Enimbolana Faharoa) MG-UPNNC-186044-NC-RFB / Travaux d'impression repartis en 4 lots: Scale up coverage and lot 1: Agenda 2021 Single Stage - One IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 35,200.00 31,953.25 Signed 2020-09-01 2020-06-23 2020-09-08 2020-10-08 2020-08-14 2020-10-22 2020-09-04 2020-11-08 2020-11-03 2020-12-23 lot 2: Calendriers muraux Envelope minimum package lot 3: Calendriers chevalets lot 4: Bulletins périodiques N°15 et N°16 MG-UPNNC-186002-NC-RFQ Scale up coverage and / Impression et livraison de Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Open - National 15,400.00 15,715.12 Completed 2020-09-08 2020-10-06 2020-03-18 2020-11-05 2020-05-07 dépliants guide de message et Quotations Envelope minimum package affiches répartis en 2 lots MG-UPNNC-203393-NC-RFQ Project Management, / Déménagement de l'UPNNC, Request for Single Stage - One IDA / D2570 Capacity Building and Post Limited 30,000.00 2,909.87 Signed 2020-11-13 2020-08-04 2020-12-18 2020-09-23 2021-12-18 Prospection d'un nouveau Quotations Envelope Operations Support local MG-UPNNC-189838-NC-RFP Project Management, / Déménagement de l' UPNNC. Request for Single Stage - Two IDA / D2570 Capacity Building and Prior Limited 30,000.00 0.00 Canceled 2020-08-24 2020-08-25 2020-09-09 2020-09-15 2021-09-15 Prospection d'un nouveau Proposals Envelope Operations Support local MG-UPNNC-154757-NC-RFQ Scale up coverage and Pending / Transport vers districts Request for Single Stage - One IDA / D2570 utilization of the RMCHN Post Limited 90,156.00 0.00 Implementati 2021-01-25 2021-03-01 2021-03-31 (LNS/Plumpy/Matériels/Suppo Quotations Envelope minimum package on rts vers la région Bongolava MG-UPNNC-216417-NC-RFQ / lot 1: Acheminement de plumpy sup pours les 06 régions lot 2: Acheminement de 2 440 Radios solaires pour Scale up coverage and Pending Request for Single Stage - One Analamanga et Alaotra IDA / D2570 utilization of the RMCHN Post Limited 100,000.00 0.00 Implementati 2021-03-01 2021-03-26 2021-04-09 Quotations Envelope Mangoro minimum package on lot 3: Acheminement de 2 678 Armoires métalliques pour les 05 régions lot 4: Acheminement des outils de communication MG-UPNNC-221886-NC-RFQ / Confection et livraison des outils de communication Scale up coverage and Pending Request for Single Stage - One réparties en 03 lots: IDA / D2570 utilization of the RMCHN Post Limited 11,000.00 0.00 Implementati 2021-04-06 2021-05-11 2021-06-10 Quotations Envelope Lot 1: 86 Roll up minimum package on Lot 2: 36 Oriflammes Lot 3: 04 Fanions MG-UPNNC-221890-NC-RFB / Confection et livraison des outils de communications répartis en 04 lots: Lot 1: 1 114 Banderoles Scale up coverage and Under Lot 2: 2 200 Blouses pour les Single Stage - One IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 65,800.00 0.00 Implementati 2021-03-29 2021-03-01 2021-04-05 2021-05-20 2021-05-05 2021-04-12 2021-05-19 2021-06-05 2021-07-20 AC Envelope minimum package on Lot 3: 2 200 Chapeaux bob pour les AC Lot 4: 1 400 Drapeaux pour les sites communautaires Lot 5: 4 000 Tee shirts MG-UPNNC-221899-NC-RFQ Scale up coverage and Pending Request for Single Stage - One / Production de 1 000 Stylos IDA / D2570 utilization of the RMCHN Post Limited 1,800.00 0.00 Implementati 2021-03-22 2021-04-26 2021-05-26 Quotations Envelope personnalisé minimum package on MG-UPNNC-223751-NC-RFB / Acquisition de visuel en communication réparties en 05 lots: Lot 1: Confection 1 385 Plaques pour sites Scale up coverage and Under Lot 2: Confection 10 Single Stage - One IDA / D2570 utilization of the RMCHN Post Request for Bids Open - National 94,000.00 0.00 Implementati 2021-03-15 2021-03-15 2021-03-22 2021-04-21 2021-04-19 2021-05-05 2021-05-22 2021-07-01 Présentoirs de tables Envelope minimum package on Lot 3: Impression 11 000 Dépliants Lot 4: Impression 1 100 Feuillets Lot 5: Production 1 100 Bâches alim CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Management, UPNNC 3 15 SMC / Least Cost IDA / V0970 Capacity Building and Post Open - National 15,000.00 7,385.25 Completed 2017-11-08 2017-12-14 2017-11-22 2017-12-27 2017-12-13 2018-03-08 2017-12-27 2018-04-05 2018-01-10 2018-05-02 2018-02-14 2018-05-14 2018-03-14 2018-05-28 2018-06-12 2018-06-25 Consultant - Auditeur Externe Selection Operations Support UPNNC 3 18 SQC MANUELS / Project Management, Consultant Consultant chargé de la mise IDA / V0970 Capacity Building and Post Qualification Open - National 20,000.00 14,408.60 Completed 2017-12-26 2017-12-14 2018-01-09 2018-01-30 2018-01-22 2018-02-13 2018-02-07 2018-03-13 2018-02-07 2018-07-11 2018-04-12 à jour du manuel d'opération Operations Support Selection du Projet Page 4 UPNNC 3 16 SQC SUPPL / Project Management, Consultant Cabinet de recrutement du IDA / V0970 Capacity Building and Post Qualification Limited 10,000.00 9,876.60 Completed 2018-01-01 2018-01-11 2018-01-15 2018-02-16 2018-01-29 2018-02-22 2018-03-05 2018-02-22 2018-04-04 2018-05-23 personnel supplémentaire Operations Support Selection (UCP) UPNNC 3 36 SQC EVAL BESOIN EN FORMATION / CONSEILS ET ASSISTANCE TECHNIQUE INTERNATIONALE POUR MODERNISER LA Strengthen capacity to Consultant FORMATION DES AGENTS IDA / V0970 manage and deliver the Post Qualification Open - International 500,000.00 312,906.00 Signed 2018-02-15 2018-03-08 2018-03-01 2018-03-09 2018-04-14 2018-05-16 2018-05-14 2018-09-28 2018-06-07 2018-10-01 2018-10-05 DANS LES CENTRES DE SANTE RMCHN minimum package Selection DE BASE ET DES AGENTS COMMUNAUTAIRES DE SANTE ET DE NUTRITION A MADAGASCAR UPNNC 3 25 SMC CONTROLE TRAVAUX UCP / Bureau Project Management, Least Cost d'étude chargé du contrôle IDA / V0970 Capacity Building and Post Open - National 12,000.00 6,811.02 Signed 2018-02-15 2018-01-11 2018-03-01 2018-03-29 2018-03-14 2018-04-26 2018-04-17 2018-05-10 2018-04-27 2018-06-07 2018-05-16 2018-07-05 2018-05-15 2019-01-01 2018-09-26 Selection des travaux extension Bureau Operations Support UCP UPNNC 1 8 FORMATION EN AUDIT INTERNE / Project Management, Consultant Renforcement de capacité en IDA / V0970 Capacity Building and Post Qualification Limited 5,000.00 2,588.70 Signed 2018-02-15 2018-02-08 2018-03-01 2018-02-08 2018-03-15 2018-04-19 2018-02-15 2018-04-24 matière d'audit interne de Operations Support Selection projets UPNNC 3 38 SFQC Scale up coverage and EVALUATION MIS / Firme Quality And Cost- IDA / V0970 utilization of the RMCHN Post Open - International 350,000.00 329,513.00 Signed 2018-05-04 2018-03-28 2018-05-25 2018-07-08 2018-05-24 2018-08-05 2018-08-03 2018-09-04 2018-10-12 2018-10-09 2018-10-12 2018-11-13 2019-07-30 2019-05-12 internationale chargée de Based Selection minimum package l'évaluation du HMIS PARN UPNNC 1 6 1 23 ONG HAUTE MATSIATRA / Sélection de ONG/Associations partenaires chargées du Strengthen capacity to Consultant fonctionnement des sites IDA / D2570 manage and deliver the Post Qualification Open - National 875,000.00 29,122.48 Signed 2018-05-18 2019-07-22 2018-06-30 2018-08-11 2018-09-21 2018-09-08 2018-08-02 2018-09-22 2018-10-30 2019-12-31 communautaires et vouchers RMCHN minimum package Selection dans la Région Haute Matsiatra (737 sites dans 7 districts répartis en 33 lots) PARN UPNNC 1 6 ONG VAKINANKARATRA / Sélection de ONG/Associations partenaires chargées du Strengthen capacity to Consultant fonctionnement des sites IDA / D2570 manage and deliver the Post Qualification Open - National 1,100,000.00 30,623.37 Signed 2018-05-18 2018-05-17 2018-06-30 2018-08-11 2018-08-20 2018-09-08 2018-11-19 2018-09-22 2018-10-31 2019-12-31 communautaires et vouchers - RMCHN minimum package Selection Région Vakinankaratra (904 sites dans 7 districts répartis en 40 lots) PARN UPNNC 1 6 1 23 ONG AMORONIMANIA / ONG/Associations partenaires chargées du fonctionnement Strengthen capacity to Consultant des sites communautaires et IDA / D2570 manage and deliver the Post Qualification Open - National 875,000.00 36,728.23 Signed 2018-05-18 2018-09-12 2018-06-30 2018-08-11 2018-09-11 2018-09-08 2018-10-29 2018-09-22 2018-10-30 2019-12-31 vouchers dans la Région RMCHN minimum package Selection Amoron'i Mania (713 sites dans 4 districts répartis en 32 lots) PARN UPNNC 1 6 1 23 ONG ITASY / ONG/Associations partenaires chargées du Strengthen capacity to Consultant fonctionnement des sites IDA / D2570 manage and deliver the Post Qualification Open - National 650,000.00 31,789.95 Signed 2018-05-18 2018-05-17 2018-06-30 2018-08-11 2018-09-07 2018-09-08 2018-10-30 2018-09-22 2018-11-10 2019-12-31 communautaires et vouchers RMCHN minimum package Selection dans la Région Itasy (539 sites dans 3 districts répartis en 24 lots) PARN UPNNC 3 1 SMC RECRUTEMENT / Cabinet Project Management, Least Cost chargé du recrutement du IDA / D2570 Capacity Building and Post Open - National 10,000.00 0.00 Canceled 2018-08-10 2018-08-10 2018-08-24 2018-09-21 2018-10-05 2018-11-02 2018-11-16 2018-12-14 Selection personnel complémentaire Operations Support pour l'U-PNNC UPNNC 3 38 EVALUATION Scale up coverage and Consultant SYSTEME INFO SANIT / IDA / V0970 utilization of the RMCHN Post Qualification Limited 250,000.00 0.00 Canceled 2017-12-26 2018-03-21 2018-01-09 2018-01-30 2018-02-20 2018-08-19 Evaluation du système minimum package Selection d'information sanitaire UPNNC 3 9 SQC ONG VAKINANKARATRA / Réactivation et redynamisation Strengthen capacity to Consultant des activités des sites de IDA / V0970 manage and deliver the Post Qualification Open - National 123,000.00 0.00 Canceled 2017-11-17 2017-12-01 2017-12-29 2018-01-19 2018-02-16 2018-09-14 nutrition dans le RMCHN minimum package Selection Vakinankaratra (22ONG/541sites/54animateu rs) UPNNC 3 9 SQC ONG AMORONIMANIA / Réactivation et redynamisation Strengthen capacity to Consultant des activités des sites de IDA / V0970 manage and deliver the Post Qualification Open - National 78,000.00 0.00 Canceled 2017-11-17 2017-12-01 2017-12-29 2018-01-19 2018-02-16 2018-09-14 nutrition dans l'AmoronImania RMCHN minimum package Selection (17ONG/330sites/33animateu rs) UPNNC 3 9 SQC ONG ITASY / Réactivation et redynamisation Strengthen capacity to Consultant des activités des sites de IDA / V0970 manage and deliver the Post Qualification Open - National 22,000.00 0.00 Canceled 2017-11-17 2017-12-01 2017-12-29 2017-12-31 2018-01-21 2018-08-19 nutrition dans l'Itasy RMCHN minimum package Selection (6ONG/125sites/13animateur s) UPNNC 3 9 SQC ONG HAUTE MATSIATRA / Réactivation et redynamisation des activités Strengthen capacity to Consultant des sites de nutrition dans la IDA / V0970 manage and deliver the Post Qualification Open - National 110,000.00 0.00 Canceled 2017-11-17 2017-12-01 2017-12-29 2018-01-19 2018-02-16 2018-09-14 Haute Matsiatra RMCHN minimum package Selection (19ONG/484sites/48animateu rs) UPNNC 1 14 SQC / Strengthen capacity to Consultant Consultant chargé de l'étude IDA / V0970 manage and deliver the Post Qualification Open - National 50,000.00 0.00 Canceled 2017-11-07 2017-11-21 2018-01-02 2018-01-16 2018-02-13 2018-06-13 de faisabilité pour la mise en RMCHN minimum package Selection place du fonds dédié Page 5 UPNNC 3 38 SQC Scale up coverage and Consultant EVALUATION MIS / Firme IDA / V0970 utilization of the RMCHN Post Qualification Open - International 350,000.00 0.00 Canceled 2018-03-09 2018-03-23 2018-03-21 2018-04-27 2018-05-27 2018-07-01 2018-12-28 internationale chargée de minimum package Selection l'évaluation du HMIS MG-UPNNC-94277-CS-CQS / Project Management, Consultant Recrutement Directeur IDA / D2570 Capacity Building and Post Qualification Open - National 22,400.00 0.00 Canceled 2018-06-11 2018-06-07 2018-07-20 2019-07-22 2018-11-06 2019-01-11 2019-02-18 2020-02-18 National U-PNNC Operations Support Selection MG-UPNNC-3 1 01 03 00 CABINET DE RECRUTE / Project Management, Consultant Cabinet chargé du IDA / D2570 Capacity Building and Post Qualification Open - National 5,000.00 5,890.25 Signed 2019-06-04 2018-12-31 2019-06-09 2019-07-01 2019-05-23 2019-07-06 2019-06-21 2019-07-13 2019-06-21 2019-08-02 recrutement du personnel Operations Support Selection complémentaire pour l'UPNNC (RSE-AI,Logisticien) MG-UPNNC-94277-B / Project Management, Consultant Pending Recrutement Directeur IDA / D2570 Capacity Building and Post Qualification Open - National 22,400.00 0.00 2018-06-01 2018-06-29 2018-10-19 2018-12-14 2019-01-04 2023-01-04 Implementation National pour l'UPNNC Operations Support Selection MG-UPNNC-170818-CS-FBS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites Fixed Budget Under IDA / D2570 manage and deliver the Post Open - National 200,000.00 0.00 2020-08-03 2020-03-21 2020-08-17 2020-09-14 2020-10-14 2020-11-13 2020-12-27 2021-02-09 2022-08-03 communautaires et vouchers Selection Implementation RMCHN minimum package dans la région Amoron'i Mania repartie en 7 lots. MG-UPNNC-170815-CS-FBS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites Fixed Budget Under IDA / D2570 manage and deliver the Post Open - National 200,000.00 0.00 2020-08-03 2020-03-21 2020-08-17 2020-09-30 2020-10-30 2020-11-06 2020-12-04 2021-02-02 2022-07-27 communautaires et vouchers Selection Implementation RMCHN minimum package dans la région Haute Matsiatra repartie en 7 lots. MG-UPNNC-170820-CS-FBS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites Fixed Budget Under IDA / D2570 manage and deliver the Post Open - National 120,000.00 0.00 2020-08-03 2020-03-21 2020-08-17 2020-09-30 2020-10-30 2020-11-29 2020-12-27 2021-02-25 2022-08-19 communautaires et vouchers Selection Implementation RMCHN minimum package dans la région Itasy reparties en 4 lots MG-UPNNC-170841-CS-FBS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites Fixed Budget Under IDA / D2570 manage and deliver the Post Open - National 330,000.00 0.00 2020-08-03 2020-03-21 2020-08-17 2020-09-30 2020-10-30 2020-11-13 2020-12-27 2021-02-25 2022-08-19 communautaires et vouchers Selection Implementation RMCHN minimum package dans la région Vakinakaratra repartie en 10 lots MG-UPNNC-186006-CS-FBS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to Fixed Budget Under communautaires et vouchers IDA / D2570 manage and deliver the Post Open - National 400,000.00 0.00 2020-09-01 2019-10-08 2020-10-01 2020-10-17 2020-11-16 2020-11-30 2020-12-14 2021-01-07 2021-03-02 Selection Implementation dans la région Bongolava, RMCHN minimum package dont 02 Districts répartis en 15 lots. MG-UPNNC-199553-CS-FBS / Sélection ONG/Associations Partenaires pour l'intervention Scale up coverage and Fixed Budget Under dans les secteurs de la IDA / D2570 utilization of the RMCHN Post Open - National 900,000.00 0.00 2020-11-02 2020-06-15 2020-12-02 2021-01-31 2021-03-02 2021-04-01 2021-05-31 2021-06-08 2022-11-30 Selection Implementation nutrition et de la santé dans la minimum package région Alaotra Mangoro (30 lots dont 30 contrats) MG-UPNNC-199548-CS-FBS / Sélection ONG/Associations partenaires pour l'intervention Scale up coverage and Fixed Budget Pending dans les secteurs de la IDA / D2570 utilization of the RMCHN Prior Open - National 1,900,000.00 0.00 2020-12-28 2021-01-27 2021-03-28 2021-04-27 2021-05-27 2021-07-26 2021-08-12 2023-02-03 Selection Implementation nutrition et de la santé dans la minimum package région Analamanga (61 lots c'est à dire 61 contrats) MG-UPNNC-234950-CS-CQS / Sélection de consultant en charge de l'étude Phase 1 et, Project Management, Consultant Phase 2 la gestion, contrôle et Pending IDA / D2570 Capacity Building and Post Qualification Limited 80,000.00 0.00 2021-06-15 2021-06-22 2021-07-22 2021-08-12 2022-04-12 surveillance des travaux Implementation Operations Support Selection d'extension et surélévation d'un bâtiment à usage de bureau pour l'UPNNC et l'ONN INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UPNNC 1-3 INDV / Scale up coverage and Individual Consultant chargé de la IDA / V0970 utilization of the RMCHN Post Consultant Open 64,000.00 33,580.86 Signed 2017-11-07 2017-12-14 2017-12-26 2018-01-19 2018-01-09 2018-02-13 2018-02-06 2018-05-14 2018-06-06 consolidation des mécanismes minimum package Selection de gratuités UPNNC 1 12 INDV / Consultant chargé de l'analyse Strengthen capacity to Individual et conception de base de IDA / V0970 manage and deliver the Post Consultant Open 50,000.00 10,096.46 Signed 2017-11-07 2018-03-08 2018-01-02 2018-06-06 2018-01-16 2018-09-24 2018-02-13 2018-11-19 2018-05-14 données intégrées sur RMCHN minimum package Selection tablettes UPNNC 3 3 INDV / Consultant Strengthen capacity to Individual chargé de l'évaluation des IDA / V0970 manage and deliver the Post Consultant Open 60,000.00 12,232.05 Signed 2017-11-07 2018-02-08 2017-12-24 2018-04-11 2018-01-07 2018-05-18 2018-02-04 2018-05-22 2018-04-05 besoins de renforcement de RMCHN minimum package Selection capacité UPNNC 1 13 ED / Consultant chargé de l'étude préalable à Strengthen capacity to la mise à l'échelle du IDA / V0970 manage and deliver the Post Direct Selection Direct 115,000.00 101,480.00 Completed 2017-10-20 2017-11-21 2017-11-17 2017-11-27 2018-01-05 2017-11-29 2018-04-05 2018-09-26 Financement Basé sur les RMCHN minimum package Résultats (FBR) Page 6 UPNNC 1 5 ED JHU / Consultant chargé de la consolidation des systèmes de motivation utilisées et charges de travail /prestation de Scale up coverage and services, connaissances IDA / V0970 utilization of the RMCHN Post Direct Selection Direct 350,000.00 280,927.00 Signed 2017-11-16 2017-12-17 2017-11-26 2018-01-30 2018-03-27 2018-07-29 acquises et compétences des minimum package ACN et AC au niveau des 8 Régions (rouge et jaune) et 2 Régions du FA FSS dans le cadre des UPNNC 3 33 ED ALIVE THRIVE / Etat des lieux et préparation Scale up coverage and du Plan de communication IDA / V0970 utilization of the RMCHN Post Direct Selection Direct 450,000.00 449,678.00 Signed 2017-11-17 2017-11-29 2017-11-27 2018-01-22 2018-02-12 2018-07-21 pour le Projet suivant le PNAN minimum package III. UPNNC 1 13 INDV RBF2 / Détermination des coûts et niveaux de subvention par Strengthen capacity to Individual résultat de la mise en oeuvre IDA / V0970 manage and deliver the Post Consultant Limited 15,000.00 16,600.00 Completed 2017-11-17 2017-12-14 2017-12-01 2017-12-16 2017-12-22 2018-02-08 2018-01-26 2018-02-24 2018-03-27 2018-04-18 du financement basé sur la RMCHN minimum package Selection performance dans le secteur santé à Madagascar UPNNC 3 29 ED STIMULATION PRECOCEE / Stimulation précoce : appuyer la préparation des différentes Scale up coverage and phases d'implémentation et IDA / V0970 utilization of the RMCHN Post Direct Selection Direct 50,000.00 5,123.42 Signed 2017-12-26 2018-03-08 2018-01-10 2018-03-21 2018-02-07 2018-03-26 2018-04-08 d'assurer un transfert de minimum package compétence à l'équipe nationale dans la formation, le suivi et la supervision UPNNC 3 40 COACH ED NAT / Consultant National chargé Project Management, de la facilitation et Coaching IDA / V0970 Capacity Building and Post Direct Selection Direct 50,000.00 80,730.64 Signed 2018-01-01 2018-01-30 2018-01-11 2018-01-30 2018-03-17 2018-03-27 2019-03-12 pour la mise en œuvre PARN- Operations Support APPM UPNNC 1 9 FORMATION EN GESTION FINANCIE / Project Management, Pending Renforcement de capacité en IDA / V0970 Capacity Building and Post Direct Selection Direct 5,000.00 0.00 2018-02-16 2018-02-26 2018-05-02 2018-05-09 Implementation matière d'audit interne de Operations Support projets UPNNC 3 15 IND AUDIT NATIONAL MSANP / Consultant chargé de Project Management, Individual l'exploitation des informations IDA / V0970 Capacity Building and Post Consultant Open 10,000.00 5,594.89 Signed 2018-02-16 2018-02-21 2018-04-06 2018-03-30 2018-04-27 2018-04-06 2018-05-25 2018-04-06 2018-06-24 collectées et élaboration du Operations Support Selection rapport de l'audit national - Ministère de la Santé UPNNC 3 29 ED ECD INSTITUTEUR / Assistance en ECD - Appuyer la psychologue Scale up coverage and Individual (1) dans la préparation et IDA / V0970 utilization of the RMCHN Post Consultant Direct 5,000.00 1,114.11 Signed 2018-03-20 2018-03-08 2018-03-30 2018-03-21 2018-04-13 2018-03-26 2018-05-11 2018-03-26 2019-03-07 facilitation des ateliers, (2) minimum package Selection réalisation du pré-test et (3) réunion de discussion UPNNC 3 29 ED ECD EDUCATEUR / Assistance en ECD - Appuyer la psychologue Scale up coverage and Individual (1) dans la préparation et IDA / V0970 utilization of the RMCHN Post Consultant Direct 5,000.00 571.34 Signed 2018-03-20 2018-03-08 2018-03-30 2018-03-21 2018-04-13 2018-03-26 2018-05-11 2018-03-26 2019-03-07 facilitation des ateliers, (2) minimum package Selection réalisation du pré-test et (3) réunion de discussion UPNNC 3 29 ED ECD ASSISTANTE SOCIALE / Assistance en ECD - Appuyer Scale up coverage and Individual la psychologue (1) dans la IDA / V0970 utilization of the RMCHN Post Consultant Direct 5,000.00 1,114.11 Signed 2018-03-20 2018-03-08 2018-03-30 2018-03-21 2018-04-13 2018-03-26 2018-05-11 2018-03-26 2019-03-07 préparation et facilitation des minimum package Selection ateliers, (2) réalisation du pré- test et (3) réunion de discussion UPNNC 3 29 ED ECD ASSISTANTE SOCIALE 2 / Assistance en ECD - Appuyer Scale up coverage and Individual la psychologue (1) dans la IDA / V0970 utilization of the RMCHN Post Consultant Direct 5,000.00 1,114.11 Signed 2018-03-20 2018-03-08 2018-03-30 2018-03-21 2018-04-13 2018-03-26 2018-05-11 2018-03-26 2019-03-07 préparation et facilitation des minimum package Selection ateliers, (2) réalisation du pré- test et (3) réunion de discussion PARN UPNNC 2 10 JHU / Scale up coverage and Assistance technique IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 400,000.00 0.00 Canceled 2018-05-20 2019-10-14 2018-06-17 2018-07-29 2019-12-31 internationale effectuée par minimum package l'Université John Hopkins PARN UPNNC 2 10 Scale up coverage and TANGERINE HCD / Consultant IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 100,000.00 0.00 Canceled 2018-05-04 2019-12-03 2018-05-18 2018-06-01 2019-06-01 chargé de la recherche HCD minimum package PARN UPNNC 2 10 HCD CI / Scale up coverage and Individual Groupe de consultants IDA / D2570 utilization of the RMCHN Post Consultant Direct 100,000.00 7,578.65 Signed 2018-05-10 2018-06-14 2018-05-24 2018-05-31 2018-07-15 2018-05-31 2018-07-15 2019-05-31 individuels - assistants locaux minimum package Selection dans les recherches HCD PARN UPNNC 1 6 MANOP Strengthen capacity to Individual ONG / Consultant Individuel IDA / D2570 manage and deliver the Post Consultant Direct 5,000.00 4,676.91 Signed 2018-08-03 2018-07-17 2018-08-17 2018-08-22 2018-08-31 2018-09-19 2018-09-14 2018-09-19 2018-11-13 chargé de l'élaboration du RMCHN minimum package Selection Manuel d'Opération des ONG PARN UPNNC AT CP / Project Management, Individual Recrutement Assistant IDA / D2570 Capacity Building and Post Consultant Direct 1,500.00 1,335.69 Signed 2018-08-16 2018-08-01 2018-08-30 2018-08-01 2018-09-06 2018-08-01 2018-09-06 2018-08-01 2018-12-31 Technique UPNNC - Coursier Operations Support Selection Planton Page 7 PARN UPNNC AT RNAF / Recrutement Assistant Project Management, Individual Technique UPNNC - IDA / D2570 Capacity Building and Post Consultant Direct 9,000.00 7,643.24 Signed 2018-08-16 2018-08-01 2018-08-30 2018-08-01 2018-09-06 2018-08-01 2018-09-06 2018-08-01 2018-12-31 Responsable National Operations Support Selection Administratif et Financier Intérimaire PARN UPNNC AT CPT01 / Project Management, Individual Recrutement Assistant IDA / D2570 Capacity Building and Post Consultant Direct 3,000.00 2,412.10 Signed 2018-08-16 2018-08-01 2018-08-30 2018-08-01 2018-09-06 2018-08-01 2018-09-06 2018-08-01 2018-12-31 Technique UPNNC - Operations Support Selection Comptable PARN UPNNC AT CPT02 / Project Management, Individual Recrutement Assistant IDA / D2570 Capacity Building and Post Consultant Direct 3,000.00 2,364.29 Signed 2018-08-16 2018-08-01 2018-08-30 2018-08-01 2018-09-06 2018-08-01 2018-09-06 2018-08-01 2018-12-31 Technique UPNNC - Operations Support Selection Comptable PARN UPNNC AT SCPT / Project Management, Individual Recrutement Assistant IDA / D2570 Capacity Building and Post Consultant Direct 2,000.00 1,623.78 Signed 2018-08-16 2018-08-01 2018-08-30 2018-09-06 2018-08-01 2018-09-06 2018-08-01 2018-12-31 Technique UPNNC - Operations Support Selection Secrétaire Comptable PARN UPNNC AT APM / Project Management, Individual Recrutement Assistant IDA / D2570 Capacity Building and Post Consultant Direct 3,000.00 2,389.55 Signed 2018-08-16 2018-08-01 2018-08-30 2018-09-06 2018-08-16 2018-09-06 2018-08-01 2018-12-31 Technique UPNNC - Passation Operations Support Selection de Marchés PARN UPNNC AT TM / Project Management, Individual Recrutement Assistant IDA / D2570 Capacity Building and Post Consultant Direct 2,000.00 1,528.26 Signed 2018-08-16 2018-08-01 2018-08-30 2018-08-01 2018-09-06 2018-08-01 2018-09-06 2018-08-01 2018-12-31 Technique UPNNC - Operations Support Selection Technicien de Maintenance PARN UPNNC AT MAG / Project Management, Individual Recrutement Assistant IDA / D2570 Capacity Building and Post Consultant Direct 2,000.00 1,623.78 Signed 2018-08-16 2018-08-01 2018-08-30 2018-08-01 2018-09-06 2018-08-01 2018-09-06 2018-08-01 2018-12-31 Technique UPNNC - Operations Support Selection Magasinier UPNNC 1 11 INDV / Strengthen capacity to Individual Consultant chargé de IDA / V0970 manage and deliver the Post Consultant Open 82,000.00 0.00 Canceled 2017-11-07 2017-11-17 2017-12-31 2018-01-14 2018-02-11 2018-05-12 l'évaluation du système MIS au RMCHN minimum package Selection niveau des 2 Régions FSS UPNNC 3 36 INDV / Deux consultants individuels chargé de l'évaluation exhausitive des besoins en formation et Strengthen capacity to Individual Développement de curriculum IDA / V0970 manage and deliver the Post Consultant Open 500,000.00 0.00 Canceled 2017-11-16 2018-02-02 2018-01-04 2018-01-25 2018-03-01 2018-08-28 (FdF et supports) des RMCHN minimum package Selection intervenants au niveau des plateformes communautaires existants (AC, ACN et CSB) UPNNC 3 18 INDV / Consultant chargé de la mise Project Management, Individual à jour du manuel de IDA / V0970 Capacity Building and Post Consultant Open 20,000.00 0.00 Canceled 2017-11-07 2017-12-14 2017-12-17 2017-12-31 2018-01-28 2018-04-28 procédures du projet Operations Support Selection (opérationnel et administratif, santé et nutrition) UPNNC 3 40 COACH ED INT / Consultant International Project Management, chargé de la facilitation et IDA / V0970 Capacity Building and Post Direct Selection Direct 100,000.00 0.00 Canceled 2018-01-01 2018-01-11 2018-03-17 2019-01-11 Coaching pour la mise en Operations Support œuvre PARN-APPM MG-UPNNC-93278-CS-CDS / Sélection de Cabinet chargé Project Management, de recrutement du personnel IDA / D2570 Capacity Building and Post Direct Selection Direct 10,000.00 7,107.95 Signed 2018-12-29 2018-12-03 2019-01-03 2018-12-11 2019-01-12 2018-12-28 2019-02-02 complémentaire pour l'U- Operations Support PNNC (RNAF, RPM, ACOM et Chargé de Suivi CT) MG-UPNNC-93279-CS-INDV / Sélection de Consultant Individuel chargé d'appuyer Project Management, Individual l'Unité pour le recrutement du IDA / D2570 Capacity Building and Post Consultant Direct 3,000.00 4,339.04 Signed 2018-12-29 2018-11-01 2019-01-05 2018-11-30 2019-01-08 2018-12-14 2019-01-14 2018-12-14 2019-02-04 personnel complémentaire de Operations Support Selection l'U-PNNC (Assistant Passation de Marché, Comptable, Informaticien, Logisticien, ...) MG-UPNNC-93281-CS-CDS / Sélection de Consultant chargé de la Stratégie de changement social et de Strengthen capacity to comportement pour IDA / D2570 manage and deliver the Post Direct Selection Direct 1,300,000.00 1,353,791.00 Signed 2018-12-29 2019-01-17 2019-01-08 2019-02-22 2019-02-27 2019-09-10 2019-12-31 l'amélioration de RMCHN minimum package l'Alimentation de Nourrisson et du Jeune Enfant et de la Nutrition de la Femme (ANJE/ NdF) MG-UPNNC-95691-CS-CDS / Project Management, Recrutement Responsable Pending IDA / D2570 Capacity Building and Post Direct Selection Direct 8,000.00 0.00 2018-10-22 2018-11-08 2018-12-13 2019-06-11 Passation de Marchés Implementation Operations Support Intérimaire MG-UPNNC-3101 03 00- Project Management, Individual INDV / Recrutement IDA / D2570 Capacity Building and Post Consultant Direct 4,500.00 0.00 Canceled 2019-06-05 2019-06-15 2019-06-30 2019-07-10 2019-10-08 Responsable Suivi Evaluation Operations Support Selection pi MG-UPNNC-2 5 01 04- Strengthen capacity to ASSISTANCE TECHNIQUE / IDA / D2570 manage and deliver the Post Direct Selection Direct 500,000.00 0.00 Canceled 2019-07-29 2019-09-26 2019-08-08 2019-09-04 2019-12-03 Assistance Technique RMCHN minimum package (John Hopkins University) MG-UPNNC-124140-CS- Strengthen capacity to Individual INDV CONSULTANT HCD / IDA / D2570 manage and deliver the Post Consultant Direct 21,772.80 4,215.84 Signed 2019-07-24 2019-08-01 2019-08-07 2019-08-07 2019-08-14 2019-08-14 2019-08-28 2019-08-14 2020-08-27 Consultant chargé des RMCHN minimum package Selection recherches HCD- Consultant 1 MG-UPNNC-124143-CS- Strengthen capacity to Individual INDV / Consultant chargé des IDA / D2570 manage and deliver the Post Consultant Direct 21,120.00 14,313.02 Signed 2019-07-24 2019-08-13 2019-08-07 2019-08-07 2019-08-14 2019-08-12 2019-08-28 2019-08-14 2020-08-27 recherches HCD-Consultant 2 RMCHN minimum package Selection Page 8 MG-UPNNC-124145-CS- Strengthen capacity to Individual INDV / Consultant chargé des IDA / D2570 manage and deliver the Post Consultant Direct 6,220.80 14,771.21 Signed 2019-07-24 2019-08-13 2019-08-07 2019-08-07 2019-08-14 2019-08-13 2019-08-28 2019-08-14 2020-08-27 recherches HCD-Consultant 3 RMCHN minimum package Selection MG-UPNNC-124161-CS- Strengthen capacity to Individual INDV / Consultant chargé des IDA / D2570 manage and deliver the Post Consultant Direct 6,220.80 4,220.35 Signed 2019-07-24 2019-08-13 2019-08-07 2019-08-07 2019-08-14 2019-08-13 2019-08-28 2019-08-14 2020-08-27 recherches HCD- Consultant 4 RMCHN minimum package Selection MG-UPNNC-124162-CS- Strengthen capacity to Individual INDV / Consultant chargé des IDA / D2570 manage and deliver the Post Consultant Direct 16,800.00 14,746.79 Signed 2019-07-24 2019-08-13 2019-08-07 2019-08-07 2019-08-14 2019-08-12 2019-08-28 2019-08-14 2020-08-27 recherches HCD- Consultant 5 RMCHN minimum package Selection MG-UPNNC-124243 / Consultant assistant chargé de la conception, Scale up coverage and Individual développement et préparation IDA / D2570 utilization of the RMCHN Post Consultant Direct 5,000.00 3,040.86 Signed 2019-01-04 2019-08-12 2019-04-05 2019-09-19 2019-05-03 2019-09-25 2019-06-21 2019-09-25 2019-07-02 à l'implémentation des minimum package Selection activités de stimulation précoce des jeunes enfants- Assistant 1 MG-UPNNC-124242 / Consultant assistant chargé de la conception, Scale up coverage and Individual développement et préparation IDA / D2570 utilization of the RMCHN Post Consultant Direct 5,000.00 3,040.86 Signed 2019-01-04 2019-08-12 2019-04-05 2019-09-19 2019-05-03 2019-09-25 2019-06-21 2019-09-26 2019-07-02 à l'implémentation des minimum package Selection activités de stimulation précoce des jeunes enfants- Assistant 2 MG-UPNNC-124236 / Consultant assistant chargé de la conception, Scale up coverage and Individual développement et préparation IDA / D2570 utilization of the RMCHN Post Consultant Direct 5,000.00 3,040.86 Signed 2019-01-04 2019-08-12 2019-04-05 2019-09-19 2019-05-03 2019-09-25 2019-06-21 2019-09-26 2019-07-02 à l'implémentation des minimum package Selection activités de stimulation précoce des jeunes enfants - Assistant 3 MG-UPNNC-124232 / Consultant assistant chargé de la conception, Scale up coverage and développement et préparation IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 50,000.00 13,249.64 Signed 2019-01-04 2019-08-12 2019-04-05 2019-09-19 2019-06-14 2019-09-26 2019-07-03 à l'implémentation des minimum package activités de stimulation précoce des jeunes enfants- Consultant MG-UPNNC-127989-CS- INDV / Recruter un Scale up coverage and Individual Coordonnateur terrain des IDA / D2570 utilization of the RMCHN Post Consultant Direct 75,000.00 70,000.00 Signed 2019-08-29 2019-08-28 2019-09-12 2019-08-29 2019-09-19 2019-10-03 2019-10-03 2019-10-05 2020-03-31 activités de pilotage de la minimum package Selection Stimulation Précoce des enfants MG-UPNNC-127996-CS-CDS / Recrutement d'un cabinet Project Management, Pending pour le renforcement de IDA / D2570 Capacity Building and Post Direct Selection Direct 6,000.00 0.00 2019-08-26 2019-09-09 2019-09-30 2019-10-07 Implementation capacité en Passation de Operations Support Marchés Strengthen capacity to MG-UPNNC-134497-CS-CDS IDA / D2570 manage and deliver the Post Direct Selection Direct 4,000.00 4,005.42 Signed 2019-09-18 2019-09-16 2019-09-28 2019-09-24 2019-10-19 2019-10-11 2019-10-24 / Recyclage TOM 2 PRO RMCHN minimum package MG-UPNNC-170725-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communaitaires et vouchers RMCHN minimum package dans la région Amoron'i Mania lot 7 - Ambositra MG-UPNNC-170777-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 33,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 2 Ambatolampy MG-UPNNC-170781-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 65,280.82 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Vakinakaratra RMCHN minimum package lot 3 Antanifotsy et lot 4 Ambatolampy MG-UPNNC-170267-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 24,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 6) - Ambalavao MG-UPNNC-170281-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 31,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 2) - Ikalamavony MG-UPNNC-170788-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 91,772.74 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Vakinakaratra RMCHN minimum package lot 1 Ambatolampy, lot 1 et lot 10 Antanifotsy MG-UPNNC-170791-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 47,989.23 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 1 et lot 3 Antsirabe I Page 9 MG-UPNNC-170797-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 33,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 5 Antsirabe II MG-UPNNC-170284-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 26,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 2) - Isandra MG-UPNNC-170736-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 48,809.16 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Amoron'i RMCHN minimum package Mania: lot 11 Fandriana lot 12 Fandriana MG-UPNNC-170747-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 39,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Amboron'i RMCHN minimum package Mania lot 2 Ambatofinandrahana MG-UPNNC-170737-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 61,247.54 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Amoron'i RMCHN minimum package Mania: lot 11 Ambositra lot 3 Manandriana MG-UPNNC-170764-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 34,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 1 Miarinarivo MG-UPNNC-170801-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 34,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 8 Antsirabe II MG-UPNNC-170716-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 67,029.98 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Amoron'i RMCHN minimum package Mania lot 1-Ambositra lot 3 Ambositra MG-UPNNC-170728-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 40,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Amoron'i Mania lot 4- Fandriana MG-UPNNC-170745-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 34,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Amoron'i Mania lot 3- Ambatofinandrahana MG-UPNNC-170756-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 29,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 4 Arivonimamo MG-UPNNC-170760-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 27,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 8 Arivonimamo MG-UPNNC-170766-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 32,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 3 Miarinarivo MG-UPNNC-170772-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 28,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 3 Soavinandriana MG-UPNNC-170775-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 58,049.26 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 4 et lot 5 Soavinandriana MG-UPNNC-170782-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 6 Antanifotsy Page 10 MG-UPNNC-170787-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 76,729.35 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 7, lot 8 et lot 9 Antanifotsy MG-UPNNC-170795-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 31,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 4 Antsirabe II MG-UPNNC-170799-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 31,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 7 Antsirabe II MG-UPNNC-170802-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 31,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 1 Betafo I MG-UPNNC-170809-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 27,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 1 Faratsiho MG-UPNNC-170810-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 27,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 3 Faratsiho MG-UPNNC-170813-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 29,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 3 Mandoto MG-UPNNC-170290-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 33,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dns la régions Haute Matsiatra (lot 4) Isandra MG-UPNNC-170307-CS-CDS / ONG/Partenaires chargées Strengthen capacity to des sites communautaires et IDA / D2570 manage and deliver the Post Direct Selection Direct 38,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 vouchers dans la région Haute RMCHN minimum package Matsiatra (lot 2) - Vohibato MG-UPNNC-170748-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 39,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Amoron'i Mania lot 1 Ambatofinandrahana MG-UPNNC-170754-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 2 Arivonimamo MG-UPNNC-170758-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 6 Arivonimamo MG-UPNNC-170769-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 32,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 5 Miarinarivo MG-UPNNC-170778-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 27,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 3 Ambatolampy MG-UPNNC-170798-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 33,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 6 Antsirabe II MG-UPNNC-170297-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 3) Lalangina MG-UPNNC-170712-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 54,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Amoron'i Mania RMCHN minimum package lot 6-Ambositra lot 8 - Ambositra Page 11 MG-UPNNC-170733-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 69,316.35 0.00 Canceled 2020-08-03 2020-09-09 2020-10-26 2022-04-19 dans la région Amoron'i RMCHN minimum package Mania: lot 6- Fandriana lot 2 Fandriana MG-UPNNC-170759-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 29,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 7 Arivonimamo MG-UPNNC-170770-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 232,504.36 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Itasy : RMCHN minimum package lot 2, lot 4 et lot 6 Miarinarivo lot 1, lot 3, lot 5, lot 9 et lot 10 Arivonimamo MG-UPNNC-170771-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 31,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Itasy lot 1 Soavinandriana MG-UPNNC-170808-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 6 Betafo MG-UPNNC-170812-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 55,171.63 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 2 Mandoto et lot 5 Betafo MG-UPNNC-170720-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnent des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 24,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Amoron'i Mania lot 5-Ambositra MG-UPNNC-170724-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 25,000.00 0.00 Canceled 2020-08-03 2020-08-13 2020-10-26 2022-04-19 communautaires et vouchers RMCHN minimum package dans la région Amoron'i Mania lot 9- Ambositra MG-UPNNC-170727-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 38,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-10-26 2022-04-19 communautaires et vouchers RMCHN minimum package dans la région Amoron'i Mania - lot 3- Fandriana MG-UPNNC-170730-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 25,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Amoron'i Mania lot 5- Fandriana MG-UPNNC-170741-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 56,457.81 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Amoron'i RMCHN minimum package Mania: lot 1 Manandriana lot 4 Ambositra MG-UPNNC-170278-CS-CDS / ONG/Partenaires chargées du fonctionnement dans les Strengthen capacity to sites communautaires et IDA / D2570 manage and deliver the Post Direct Selection Direct 63,362.21 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 vouchers dans la région Haute RMCHN minimum package Matsiatra lot 1- Fianarantsoa I lot 4 - Lalalngina MG-UPNNC-170286-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 32,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 3) - Isandra MG-UPNNC-170738-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 49,134.14 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Amoron'i RMCHN minimum package Mania: lot 2 Manandriana lot 7 Fandriana MG-UPNNC-170743-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 28,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Amoron'i Mania lot 4 Manandriana MG-UPNNC-170265-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 27,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-06 2022-04-30 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 3)-Ambalavao Page 12 MG-UPNNC-170291-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 34,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 1) - Lalangina MG-UPNNC-170293-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 31,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 2) - Lalangina MG-UPNNC-170266-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 28,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-06 2022-04-30 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lo 5) - Ambalavao MG-UPNNC-170272-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 55,753.37 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Haute Matsiatra RMCHN minimum package lot 4 - Ambohimahasoa lot 6 - Ambohimahasoa MG-UPNNC-170277-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 62,184.24 0.00 Canceled 2020-08-03 2020-08-13 2020-10-26 2022-04-19 dans la région Haute Matsiatra RMCHN minimum package lot 7- Ambohimahasoa lot 2 Ambalavao MG-UPNNC-170279-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 36,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Haute RMCHN minimum package Matsiatra (lot 2) - Fianarantsoa I MG-UPNNC-170283-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 67,651.61 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Haute Matsiatra RMCHN minimum package lot 1- Isandra lot 1 Ambalavao MG-UPNNC-170269-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 54,299.59 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Haute RMCHN minimum package Matsiatra: lot 2- Ambohimahasoa lot 3 Vohibato MG-UPNNC-170271-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communaitaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 57,001.68 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 dans la région Haute Matsiatra RMCHN minimum package lot 3- Ambohimahasoa lot 5 Ambohimahasoa MG-UPNNC-170306-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra (lot 5) Lalangina MG-UPNNC-170803-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 32,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 4 Betafo MG-UPNNC-170792-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 88,622.76 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 1, lot 2 et lot 3 Antsirabe II MG-UPNNC-170811-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 35,000.00 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Vakinakaratra lot 1 Mandoto MG-UPNNC-173702-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites IDA / D2570 manage and deliver the Post Direct Selection Direct 40,258.41 0.00 Canceled 2020-08-03 2020-09-09 2020-11-22 2022-05-16 communautaires et vouchers RMCHN minimum package dans la région Haute Matsiatra lot 6 Vohibato MG-UPNNC-181752-CS-CDS / Consultant chargé du renforcement du système de Scale up coverage and soins de santé primaires à IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 980,000.00 1,046,548.00 Signed 2020-09-01 2020-12-08 2020-09-15 2021-01-14 2020-10-20 2020-04-24 2022-04-13 base communautaire à travers minimum package des études et des recherches opérationnelles MG-UPNNC-170722-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to Pending communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 39,000.00 0.00 2020-09-01 2020-10-08 2020-12-21 2022-06-14 Implementation dans la région Amoron'i RMCHN minimum package MANIA, dont 4 districts répartis en 25 lots. Page 13 MG-UPNNC-185994-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 815,000.00 31,208.05 Signed 2020-09-01 2020-03-21 2020-09-22 2020-06-10 2020-11-12 2020-07-06 2022-05-06 dans la région Amoron'i RMCHN minimum package Mania, dont 4 Districts répartis en 25 lots MG-UPNNC-185995-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 830,000.00 26,466.97 Signed 2020-09-01 2020-03-21 2020-09-22 2020-06-10 2020-10-20 2020-07-06 2020-12-13 dans la région Haute RMCHN minimum package Matsiatra, dont 07 districts répartis en 25 lots MG-UPNNC-185996-CS-CDS / ONG/Partenaires chargées du fonctionnement des sites Strengthen capacity to communautaires et vouchers IDA / D2570 manage and deliver the Post Direct Selection Direct 930,000.00 23,763.36 Signed 2020-09-01 2020-03-16 2020-09-22 2020-06-10 2020-10-20 2020-07-13 2022-04-13 dans la région Vakinakaratra, RMCHN minimum package dont 07 Districts répartis en 30 lots MG-UPNNC-185997-CS-CDS / ONG/Partenaires chargées Strengthen capacity to du fonctionnement des sites Under IDA / D2570 manage and deliver the Post Direct Selection Direct 570,000.00 0.00 2020-09-01 2020-03-21 2020-09-22 2020-10-20 2022-04-13 communautaires et vouchers Implementation RMCHN minimum package dans la région Itasy, dont 03 Districts répartis en 20 lots MG-UPNNC-199559-CS-CDS / Migration en version Web du logiciel TOP2PRO et Project Management, renforcement de capacités de Under IDA / D2570 Capacity Building and Post Direct Selection Direct 45,000.00 0.00 2020-11-09 2020-09-28 2020-11-23 2020-12-14 2021-01-13 l'équipe fiduciaire de l'UPNNC, Implementation Operations Support ONN et des ORN sur l'utilisation du logiciel comptable TOM2PRO MG-UPNNC-201768-CS-CDS / Consultant chargé de la conception, développement et Scale up coverage and Under préparation à IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 230,000.00 0.00 2020-12-15 2020-11-11 2020-12-29 2021-02-09 2022-08-03 Implementation l'implémentation des activités minimum package de stimulation précoce des jeunes enfants (ECD) PARN UPNNC 1 4 STIMULATION PRECOCE / Strengthen capacity to Individual Groupe de six (06) consultants IDA / D2570 manage and deliver the Post Consultant Direct 100,000.00 0.00 Canceled 2018-05-04 2018-03-08 2018-05-18 2018-06-15 2018-06-29 2019-12-31 individuels chargé de la RMCHN minimum package Selection stimulation précoce des enfants MG-UPNNC-203412-CS- Project Management, Individual INDV / Recrutement d'un(e) Under IDA / D2570 Capacity Building and Post Consultant Open 4,800.00 0.00 2020-11-12 2020-08-17 2020-12-23 2021-01-13 2021-01-28 2021-07-27 Assistant (e) en Passation de Implementation Operations Support Selection Marchés de l'UPNNC MG-UPNNC-201808-CS-CDS / Consultant chargé de l’appui technique à l’intégration de Scale up coverage and Under l’Approche Human Centered IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 220,000.00 0.00 2020-12-21 2020-12-16 2021-01-04 2021-02-01 2022-07-26 Implementation Design dans le cadre du Projet minimum package FAFY ainsi que la préparation de la mise à l’échelle MG-UPNNC-204559-CS- Strengthen capacity to Individual INDV / 65 Consultants Under IDA / D2570 manage and deliver the Post Consultant Open 100,000.00 0.00 2020-11-12 2020-10-15 2020-12-20 2020-12-27 2021-01-17 2022-07-11 Animateurs encadreurs dans Implementation RMCHN minimum package Selection la région VV7V MG-UPNNC-204566-CS- Strengthen capacity to Individual INDV / 16 Consultant Under IDA / D2570 manage and deliver the Post Consultant Open 100,000.00 0.00 2020-11-12 2020-10-15 2020-12-20 2020-12-27 2021-01-17 2022-07-11 Techniciens Superviseurs dans Implementation RMCHN minimum package Selection la région VV7V MG-UPNNC-214558-CS-CDS / Recrutement d’une firme Scale up coverage and pour la mise à jour du IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 240,000.00 277,945.50 Signed 2020-12-23 2020-12-23 2021-01-06 2021-01-12 2021-01-27 2021-04-20 2022-01-27 système de collecte de minimum package données Nutrition/Santé MG-UPNNC-223763-CS-CDS / Consultant chargé de l'appui Scale up coverage and technique à l'intégration de Under IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 106,000.00 0.00 2021-05-03 2021-04-21 2021-05-24 2021-06-14 2022-06-14 l'approche Human Centered Implementation minimum package Design dans le cadre du projet FAFY (HDA) MG-UPNNC-231573-CS-CDS / Consultant chargé de Scale up coverage and l'élaboration et de la mise en IDA / D2570 utilization of the RMCHN Post Direct Selection Direct 730,000.00 624,271.00 Signed 2021-05-03 2021-05-03 2021-05-24 2021-05-15 2021-06-14 2021-05-24 2022-04-11 œuvre de la stratégie du minimum package changement social. MG-UPNNC-233819-CS-CDS / Sélection de consultant en charge du suivi de la mise en place de la plateforme Strengthen capacity to communautaire et du Under IDA / D2570 manage and deliver the Post Direct Selection Direct 9,000.00 0.00 2021-05-18 2021-05-25 2021-05-22 2021-06-01 2021-06-03 2021-11-30 démarrage effectif des Implementation RMCHN minimum package activités dans les régions d’Alaotra Mangoro, d’Analamanga et de Vatovavy Fito Vignany MG-UPNNC-235501-CS- INDV / Sélection de Consultant en charge du Project Management, Individual Under Pilotage, de la préparation de IDA / D2570 Capacity Building and Post Consultant Direct 1,500.00 0.00 2021-05-27 2021-05-25 2021-06-08 2021-06-01 2021-06-29 2021-07-14 2022-05-14 Implementation la Mise à l’échelle des Operations Support Selection interventions de Stimulation Précoce des Jeunes Enfants Page 14 PROCUREMENT PLAN (Textual Part) Project information: Benin – Youth Inclusion Project; P170425 Project Implementation agency: Coordination unit of the decentralized community driven services project under the Ministry of Small and Medium Enterprises and Employment Promotion Date of the Procurement Plan: 5th March 2020 Period covered by this Procurement Plan: From 5th March 2020 to 30th December 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Benin : Benin Youth Inclusion Project PLAN General Information Country: Benin Bank’s Approval Date of the Original Procurement Plan: 2021-04-22 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170425 GPN Date: 2021-04-28 Project Name: Benin Youth Inclusion Project Loan / Credit No: IDA / 68090 N Executing Agency(ies): ATIONAL AGENCY FOR THE EMPLOYMENT'S PROMOTION WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Supporting the BJ-ANPE-224129-GO-RFQ / development of a Acquisition et paramétrage de comprehensive system for Pending 300 tablettes pour Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 60,000.00 0.00 Implementati 2021-04-27 2021-06-22 2021-12-19 l'enregistrement des Quotations Envelope vulnerable youth and on candidats par les AE sous la increasin g employability supervision des ULPE skills BJ-ANPE-227100-GO-RFQ / Acquisition de fourniture de Component 4. Project Pending Request for Single Stage - One bureau et consommable IDA / 68090 management, monitoring and Post Limited 40,000.00 0.00 Implementati 2021-04-20 2021-06-15 2021-12-12 Quotations Envelope informatique pour le evaluation on fonctionnement du SCP BJ-ANPE-227104-GO-RFQ / Component 1: Supporting the Acquisition de 91 motos (85 development of a au profit des ULPES, 02 pour comprehensive system for Pending Single Stage - One le SCP, 01 pour le FODEFCA , IDA / 68090 economic inclusion of Post Request for Bids Open - National 145,600.00 0.00 Implementati 2021-05-24 2021-05-29 2021-07-10 2021-08-09 2021-09-13 2022-03-12 Envelope 01 pour l' ANPE, 01 pour la vulnerable youth and on DETFP et 01 pour le CNP- increasin g employability ETFP) skills BJ-ANPE-224158-GO-RFQ / Recrutement d'un prestataire pour la livraison de 300 kits Component 1: Supporting the au profit des agents development of a enregistreurs (casquettes, comprehensive system for Pending Request for Single Stage - One polo, carte sim GSM pour IDA / 68090 economic inclusion of Post Limited 30,000.00 0.00 Implementati 2021-06-20 2021-08-15 2022-02-11 Quotations Envelope transfert de données par vulnerable youth and on internet, power bank, ourses increasin g employability pour tablettes, sac skills imperméables, stylos, blocs notes...) Component 1: Supporting the development of a BJ-ANPE-222386-GO-RFB / comprehensive system for Pending Single Stage - One Acquisition de mobiliers de IDA / 68090 economic inclusion of Post Request for Bids Open - National 140,250.00 0.00 Implementati 2021-06-10 2021-06-15 2021-07-27 2021-08-26 2021-09-30 2022-03-29 Envelope bureau au profit des ULPE vulnerable youth and on increasin g employability skills Component 1: Supporting the development of a BJ-ANPE-227096-GO-RFQ / comprehensive system for Pending Acquisition de fournitures et Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 97,940.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 matériels de bureau au profit Quotations Envelope vulnerable youth and on de l'ANPE, du FNM et du SCP increasin g employability skills Component 1: Supporting the BJ-ANPE-232220-GO-RFB / development of a Acquisition de matériel comprehensive system for Pending Single Stage - One informatique au profit des IDA / 68090 economic inclusion of Post Request for Bids Open - National 277,500.00 0.00 Implementati 2021-05-31 2021-06-05 2021-07-17 2021-08-16 2021-09-20 2022-03-19 Envelope agences (ANPE-FODEFCA) , du vulnerable youth and on MPMEPE et des ULPES increasin g employability skills NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Supporting the BJ-ANPE-224153-GO-RFQ / development of a Recrutement d'un prestataire comprehensive system for Pending Request for Single Stage - One pour l'impression et la IDA / 68090 economic inclusion of Post Open - National 100,000.00 0.00 Implementati 2021-05-05 2021-06-30 2021-12-27 Quotations Envelope répartition de 200 000 cartes vulnerable youth and on à gratter increasin g employability skills Component 1: Supporting the BJ-ANPE-224126-GO-RFB / development of a Recrutement d'un prestataire comprehensive system for Pending Single Stage - One pour l'impression et le IDA / 68090 economic inclusion of Post Request for Bids Open - National 207,900.00 0.00 Implementati 2021-05-25 2021-05-30 2021-07-11 2021-08-10 2021-09-14 2022-03-13 Envelope déploiement des outils hors vulnerable youth and on média au profit de l'ANPE increasin g employability skills Component 1: Supporting the BJ-ANPE-224119-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobiles pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 82,831.00 0.00 Implementati 2021-05-17 2021-07-12 2022-01-08 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le Département de l'Atlantique skills Page 1 Component 1: Supporting the BJ-ANPE-231872-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobiles pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 40,225.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département du littoral skills Component 1: Supporting the BJ-ANPE-231878-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobiles pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 29,457.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département du Mono skills Component 1: Supporting the BJ-ANPE-231882-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobiles pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 44,153.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département du Couffo skills Component 1: Supporting the BJ-ANPE-231883-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobiles pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 50,448.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département du Zou skills Component 1: Supporting the BJ-ANPE-231884-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobiles pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 42,503.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département des Collines skills Component 1: Supporting the BJ-ANPE-232096-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobiles pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 65,188.00 0.00 Implementati 2021-05-30 2021-07-25 2022-01-21 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département de l'Ouémé skills Component 1: Supporting the BJ-ANPE-232098-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobile pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 36,870.00 0.00 Implementati 2021-05-30 2021-07-25 2022-01-21 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département du plateau skills Component 1: Supporting the BJ-ANPE-232100-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobile pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 71,932.00 0.00 Implementati 2021-05-30 2021-07-25 2022-01-21 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département du Borgou skills Component 1: Supporting the BJ-ANPE-232101-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobile pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 51,360.00 0.00 Implementati 2021-05-30 2021-07-25 2022-01-21 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département de l'Alibori skills Component 1: Supporting the BJ-ANPE-232102-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobile pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 45,750.00 0.00 Implementati 2021-05-30 2021-07-25 2022-01-21 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département de l'Atacora skills Component 1: Supporting the BJ-ANPE-232105-NC-RFQ / development of a Recrutement d'une garderie comprehensive system for Pending mobile pour la garde des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 32,175.00 0.00 Implementati 2021-05-30 2021-07-25 2022-01-21 enfants des femmes nourrices Quotations Envelope vulnerable youth and on au cours des formations dans increasin g employability le département de la Donga skills BJ-ANPE-233637-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 32,741.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Banikora et skills Karimama BJ-ANPE-233649-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 31,055.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Gogounou et skills Kandi BJ-ANPE-233650-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 26,913.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Ségbana et skills Malanville Page 2 BJ-ANPE-233651-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 31,611.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Tchaourou et skills Pèrèrè BJ-ANPE-233654-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 31,035.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Kalalé et skills Parakou 1 BJ-ANPE-233657-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 27,709.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Nikki et N'Dali skills BJ-ANPE-233658-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 36,690.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Sinendé, skills Bembèrèkè et Parakou 2. BJ-ANPE-233659-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 23,513.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Cobly, skills Bounkoumbé et Tanguiéta. BJ-ANPE-233660-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 30,337.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Kouandé, Pérou skills et Péhunco BJ-ANPE-233664-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 26,950.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Matéri, skills Natitingou et Toucountouna BJ-ANPE-233665-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 28,021.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans la increasin g employability commune de Djougou skills BJ-ANPE-233669-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 28,806.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Ouaké, Bassila skills et Copargo BJ-ANPE-233671-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 32,303.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes dd'Abomey, Djidja skills et Zogbodomey BJ-ANPE-233672-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 30,926.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Agbangnizoun, skills Bohicon et Covè BJ-ANPE-233673-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 25,870.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Zagnannado, skills Ouinhi et Za-Kpota BJ-ANPE-233674-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 26,338.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Bantè et skills Savalou Page 3 BJ-ANPE-233675-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 24,750.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Dassa-Zoumè skills et Glazoué BJ-ANPE-233676-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 23,980.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Savè et Oussè skills BJ-ANPE-233677-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 24,806.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Djakotomey et skills Dogbo BJ-ANPE-233678-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 26,003.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Klouekanmè et skills Lalo BJ-ANPE-233679-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 20,774.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Toviklin et skills Aplahoué BJ-ANPE-233680-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 25,262.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Lokossa, skills Athièmè et Comè. BJ-ANPE-233682-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 26,765.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Bopa, skills Houéyogbé et Grand Popo BJ-ANPE-233684-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 27,655.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans la increasin g employability commune de Porto Novo skills BJ-ANPE-233685-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 27,272.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes d'Adjohoun, skills Dangbo, Bonou et Aguégué BJ-ANPE-233686-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 33,494.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Sèm--Kpodji et skills Adjarra BJ-ANPE-233687-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 26,712.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Akpro- skills Missérété et Avrankou BJ-ANPE-233689-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 29,404.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Kétou et Pobè skills BJ-ANPE-233690-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 35,714.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Sakété, Adja- skills Ouèrè et Ifangni Page 4 BJ-ANPE-233691-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 34,337.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans la increasin g employability commune de Abomey Calavi 1 skills BJ-ANPE-233692-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 34,337.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans la increasin g employability commune de ABomey calavi 2 skills BJ-ANPE-233694-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 23,590.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Zè et Sô Ava skills BJ-ANPE-233697-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending aux bénéficiaires lors des Request for Single Stage - One IDA / 68090 economic inclusion of Post Open - National 30,061.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 formations OP, ACV, PV-PP, Quotations Envelope vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Ouidah, skills Kpomassè et Tori-Bossito BJ-ANPE-233698-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 23,970.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans les increasin g employability communes de Toffo et Allada skills BJ-ANPE-233700-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 35,522.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans la increasin g employability commune de Cotonou 1 skills BJ-ANPE-233702-NC-RFQ / Component 1: Supporting the Recrutement d'un prestataire development of a pour la fourniture de repas comprehensive system for Pending Request for Single Stage - One aux bénéficiaires lors des IDA / 68090 economic inclusion of Post Open - National 35,522.00 0.00 Implementati 2021-06-27 2021-08-22 2022-02-18 Quotations Envelope formations OP, ACV, PV-PP, vulnerable youth and on TRIE /CREE et Germe dans la increasin g employability commune de Cotonou 2 skills CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Supporting the development of a BJ-ANPE-222375-CS-CQS / comprehensive system for Consultant Recrutement d'un consultant Pending IDA / 68090 economic inclusion of Post Qualification Open - National 60,000.00 0.00 2021-04-22 2021-05-13 2021-06-26 2021-07-26 2021-08-30 2022-02-26 pour la mise en place d'un SIG Implementation vulnerable youth and Selection au profit du dispositif AZOLI increasin g employability skills BJ-ANPE-222399-CS-CQS / Recrutement d'une agence de Component 1: Supporting the communication au profit de development of a l'ANPE pour l'élaboration et comprehensive system for Consultant Pending l'appui à la mise en oeuvre du IDA / 68090 economic inclusion of Post Qualification Open - National 160,000.00 0.00 2021-04-20 2021-05-11 2021-06-24 2021-07-24 2021-08-28 2022-02-24 Implementation plan de communication ( vulnerable youth and Selection définition des messages, increasin g employability outils et modalités de skills communication) BJ-ANPE-226000-CS-CDS / Recrutement d'un cabinet Component 1: Supporting the d'ingénierie de formation du development of a dispositif AZOLI pour la comprehensive system for Consultant conception/actualisation des Under IDA / 68090 economic inclusion of Post Qualification Open - National 290,000.00 0.00 2021-04-29 2021-04-28 2021-05-20 2021-07-03 2021-08-02 2021-09-06 2022-03-05 modules (orientations Implementation vulnerable youth and Selection professionnel, ACV,PV-PP, increasin g employability GERME niveau1), formation skills des formateurs, suivi pédagogique des formateurs BJ-ANPE-226003-CS-CQS / Recrutement d'un cabinet à Component 1: Supporting the charge de l'élaboration d'une development of a démarche globale comprehensive system for Consultant Pending d'accompagnement des IDA / 68090 economic inclusion of Post Qualification Open - National 47,560.00 0.00 2021-10-01 2021-10-22 2021-12-05 2022-01-04 2022-02-08 2022-08-07 Implementation jeunes ayant choisi le chemin vulnerable youth and Selection de l'emploi salarié (y compris increasin g employability l'élaboration du module TRE) skills et la formation des formateurs BJ-ANPE-226005-CS-CQS / Recrutement d'1 cabinet à charge de l'élaboration d'1e Component 1: Supporting the démarche globale development of a d'accompagnement des comprehensive system for Consultant Pending jeunes de la 2ième génération IDA / 68090 economic inclusion of Post Qualification Open - National 34,796.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 Implementation ayant choisi le chemin du vulnerable youth and Selection développement des affaires y increasin g employability compris l'élaboration des skills modules et la formation des opérateurs BDS Page 5 BJ-ANPE-226043-CS-CQS / recrutement d'un cabinet pour Component 4. Project Consultant la conception et l'installation Under IDA / 68090 management, monitoring and Post Qualification Limited 20,000.00 0.00 2021-04-15 2021-04-22 2021-04-29 2021-05-29 2021-07-03 2021-12-30 d'un logiciel de gestion Implementation evaluation Selection financière y compris la formation des utilisateurs BJ-ANPE-227219-CS-CQS / Recrutement d'un cabinet Component 4. Project Consultant pour la conception d'une IDA / 68090 management, monitoring and Post Qualification Limited 20,000.00 0.00 Under Review 2021-04-15 2021-04-22 2021-04-29 2021-05-29 2021-07-03 2021-12-30 application informatique de evaluation Selection suivi évaluation, de reporting du ProDIJ BJ-ANPE-227223-CS-LCS / Component 4. Project Recrutement d'un cabinet Least Cost Pending IDA / 68090 management, monitoring and Post Open - National 40,000.00 0.00 2021-10-11 2021-11-01 2021-12-15 2022-01-12 2022-02-11 2022-03-18 2022-04-22 2022-10-19 pour la réalisation de l'audit Selection Implementation evaluation de la mise en œuvre du CGES BJ-ANPE-226051-CS-LCS / Recrutement d'un cabinet Component 4. Project Least Cost Pending pour l'audit externe des IDA / 68090 management, monitoring and Post Open - National 24,000.00 0.00 2021-05-31 2021-06-21 2021-08-04 2021-09-01 2021-10-01 2021-11-05 2021-12-10 2024-11-24 Selection Implementation comptes du projet pour les evaluation exercices 2021-2022-2023 BJ-ANPE-227094-CS-CQS / Component 1: Supporting the Sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département de l'Atlantique BJ-ANPE-224156-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département de l'Atlantique skills BJ-ANPE-226014-CS-CDS / Recrutement d'un consultant Component 3: Increasing Consultant pour la mise en place d'une financial capital and Pending IDA / 68090 Post Qualification Open - National 63,900.00 0.00 2021-10-11 2021-11-01 2021-12-15 2022-01-14 2022-02-18 2022-08-17 interface de suivi digital du improving access to financial Implementation Selection paiement des subventions aux services of vulnerable youth bénéficiaires du ProDIJ BJ-ANPE-231848-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département de Littoral skills BJ-ANPE-231850-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département du Mono skills BJ-ANPE-231852-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département de Couffo skills BJ-ANPE-231854-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département de Zou skills BJ-ANPE-231855-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département des Collines skills BJ-ANPE-231858-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département de l'Ouémé skills BJ-ANPE-231859-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département du Plateau skills BJ-ANPE-231860-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département du Borgou skills Page 6 BJ-ANPE-231861-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département de l'Alibori skills BJ-ANPE-231863-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département de l'Attacora skills BJ-ANPE-231864-CS-CQS / Component 1: Supporting the Recrutement d'une ONG locale development of a pour l'intermédiation sociale comprehensive system for Consultant Pending auprès des jeunes dans les IDA / 68090 economic inclusion of Post Qualification Open - National 36,000.00 0.00 2021-05-25 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 Implementation zones à risques vulnerable youth and Selection d'extrémismes violents dans increasin g employability le département de la Donga skills BJ-ANPE-232202-CS-CQS / Component 1: Supporting the Sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département du Littoral BJ-ANPE-232205-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département du Couffo BJ-ANPE-232206-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département du Mono BJ-ANPE-232208-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département du Zou BJ-ANPE-232209-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département des Collines BJ-ANPE-232210-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département de l'Ouémé BJ-ANPE-232211-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département du Plateau BJ-ANPE-232214-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département de l'Atacora BJ-ANPE-232215-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département de la Donga BJ-ANPE-232217-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département du Borgou Page 7 BJ-ANPE-232218-CS-CQS / Component 1: Supporting the sélection d'un cabinet pour la development of a fournitures de services BDS comprehensive system for Consultant aux jeunes de 2ième Pending IDA / 68090 economic inclusion of Post Qualification Open - National 66,670.00 0.00 2021-10-08 2021-10-29 2021-12-12 2022-01-11 2022-02-15 2022-08-14 génération ayant choisi le Implementation vulnerable youth and Selection chemin du développement increasin g employability des affaires dans le skills département de l'Alibori BJ-ANPE-233414-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 193,500.00 0.00 2021-05-26 2021-06-16 2021-07-30 2021-08-29 2021-10-03 2022-04-01 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Karimama et Banikora BJ-ANPE-233418-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 168,170.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Gogounou et Kandi BJ-ANPE-233420-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 147,720.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Ségbana et Malanville BJ-ANPE-233423-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 183,430.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills Tchaourou et Pèrèrè BJ-ANPE-233424-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 178,240.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Kalalé et Parakou 1 BJ-ANPE-233426-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 162,980.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Nikki et N'Dali BJ-ANPE-233428-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 224,020.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Sinendé, Bembèrèkè et Parakou 2 BJ-ANPE-233429-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 147,720.00 0.00 2021-05-27 2021-06-17 2021-07-31 2021-08-30 2021-10-04 2022-04-02 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Boukombé, Cobli et Tanguiéta BJ-ANPE-233433-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 183,430.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Kouandé, Kérou et Péhunco BJ-ANPE-233435-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 162,980.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Matéri, Natitingou et Toucountouna. BJ-ANPE-233437-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 162,980.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans la commune de skills Djougou Page 8 BJ-ANPE-233438-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 178,240.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Ouaké, Bassila et Copargo BJ-ANPE-233439-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 203,570.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills d'Abomey, de Djidja et Zogbodomey. BJ-ANPE-233444-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 183,430.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Agbangnizoun, Bobicon et Covè BJ-ANPE-233447-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 152,910.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Zagnannado, Ouinhi, Za- kpota BJ-ANPE-233448-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 147,720.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Bantè et Savalou BJ-ANPE-233449-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 147,720.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Dassa Zoumè et Glazoué BJ-ANPE-233451-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 132,460.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Savè et Ouèssè BJ-ANPE-233453-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 147,720.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Djakotomey et Dogbo BJ-ANPE-233455-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 147,720.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Klouékanme et Lalo BJ-ANPE-233456-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 152,910.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Tovikin et Aplahoué BJ-ANPE-233458-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 152,910.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Lokossa, Athiémè et Comè Page 9 BJ-ANPE-233460-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 162,980.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Bopa, Houéyogné et Grand Popo BJ-ANPE-233462-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 162,980.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans la commune de skills Porto Novo BJ-ANPE-233463-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 173,050.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills d'Adjohoun, Dangbo, Bonou et Aguégué BJ-ANPE-233465-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 193,500.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Sèmè-Kpodji et Adjarra BJ-ANPE-233466-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 162,980.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Akpro Missrété et Avrankou BJ-ANPE-233471-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 178,240.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Kétou et Pobè BJ-ANPE-233475-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 198,690.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Sakété, Adja-Ouèrè et Ifangni BJ-ANPE-233477-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 193,500.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans la commune skills d'Abomey Calavi 1 BJ-ANPE-233482-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 193,500.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans la commune skills d'Abomey Calavi 2 BJ-ANPE-233483-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 132,460.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Zê et Sô-Ava BJ-ANPE-233485-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant l'appui à l'auto emploi Pending IDA / 68090 economic inclusion of Post Qualification Open - National 178,240.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 (orientation professionnelle, Implementation vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Ouidah, Kpomassè et Tori- Bossito Page 10 BJ-ANPE-233490-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 142,530.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans les communes skills de Toffo et Allada BJ-ANPE-233491-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 168,690.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans la commune de skills Cotonou 1 BJ-ANPE-233497-CS-CQS / Recrutement d'un cabinet de Component 1: Supporting the formation pour development of a l'accompagnement de base et comprehensive system for Consultant Pending l'appui à l'auto emploi IDA / 68090 economic inclusion of Post Qualification Open - National 198,690.00 0.00 2021-05-28 2021-06-18 2021-08-01 2021-08-31 2021-10-05 2022-04-03 Implementation (orientation professionnelle, vulnerable youth and Selection ACV, PVPP, EP et germe increasin g employability niveau 1) dans la commune de skills Cotonou 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-ANPE-227106-CS-INDV / Recrutement d'un consultant Component 4. Project Individual Pending individuel pour l'élaboration IDA / 68090 management, monitoring and Post Consultant Open 10,000.00 0.00 2021-10-26 2021-12-14 2022-01-04 2022-02-08 2022-08-07 Implementation du Plan national pour l'Emploi evaluation Selection (PNAE) 2021-2025 BJ-ANPE-227217-CS-INDV / Recrutement d'un consultant individuel pour la réalisation Component 4. Project Individual de la cartographie des Pending IDA / 68090 management, monitoring and Post Consultant Open 15,000.00 0.00 2021-10-28 2021-12-16 2022-01-06 2022-02-10 2022-08-09 Organisations de la Société Implementation evaluation Selection Civiles (OSC) intervenant dans le secteur de l'emploi et de l'entreprenariat au Bénin BJ-ANPE-227218-CS-INDV / Recrutement d'un consultant individuel pour la réalisation d'une étude pour la Component 4. Project Individual détermination des valeurs de Pending IDA / 68090 management, monitoring and Post Consultant Open 18,000.00 0.00 2021-11-02 2021-12-21 2022-01-11 2022-02-15 2022-08-14 référence des indicateurs du Implementation evaluation Selection Ministère des petites et Moyennes Entreprises et de la Promotion de l'Emploi (MPMEPE) Page 11 PROCUREMENT PLAN Project information: Sint Maarten Emergency Income Support and Training (P167368) Project Implementation agency: IRC Date of the Procurement Plan: 09/11/2018 Period covered by this Procurement Plan: August 2018 to April 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is applicable for those contracts identified in the Procurement Plan tables]; Works: [is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. PROCUREMENT St Maarten : Emergency Income Support and Training Project PLAN General Information Country: St Maarten Bank’s Approval Date of the Original Procurement Plan: 2019-07-10 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167368 GPN Date: Project Name: Emergency Income Support and Training Project Loan / Credit No: TF / A8265 National Recovery Program Bureau Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2. Strengthening SX-NRPB-126056-GO-RFQ / institutional capacity to Request for Single Stage - One Tablets to provide to TF / A8265 Post Limited 7,500.00 7,500.06 Signed 2019-08-07 2019-07-10 2019-10-02 2019-08-28 2020-03-30 enhance the social protection Quotations Envelope surveyors system Pending SX-NRPB-126057-NC-DIR / Component 3. Project TF / A8265 Post Direct Selection Direct 6,000.00 0.00 Implementati 2019-08-05 2019-08-10 2019-09-14 2020-03-12 IT equipment for staff Management on Pending SX-NRPB-232801-GO-RFQ / Component 3. Project Request for Single Stage - One TF / A8265 Post Open - National 38,000.00 0.00 Implementati 2021-05-21 2021-07-16 2022-01-12 Branding & Marketing Items Management Quotations Envelope on SX-NRPB-232454-GO-RFQ / Component 2. Strengthening Pending Procurement of Equipment institutional capacity to Request for Single Stage - One TF / A8265 Post Open - National 50,000.00 0.00 Implementati 2021-05-21 2021-07-16 2022-01-12 and Furniture for Social enhance the social protection Quotations Envelope on Registry Unit system NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2. Strengthening SX-NRPB-121880-NC-RFP / institutional capacity to Single Stage - One TF / A8265 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2019-07-25 2019-08-13 2019-07-30 2019-08-13 2019-09-10 2019-10-10 2019-11-14 2020-05-12 HR services Household Survey enhance the social protection Envelope system Component 2. Strengthening SX-NRPB-232806-NC-RFQ / Pending institutional capacity to Request for Single Stage - One Mobile data Services to TF / A8265 Post Limited 10,500.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 enhance the social protection Quotations Envelope Support Data collection on system SX-NRPB-232807-NC-RFQ / Component 2. Strengthening Pending Catering services to support institutional capacity to Request for Single Stage - One TF / A8265 Post Limited 6,000.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 training for data potential enhance the social protection Quotations Envelope on collectors system Component 2. Strengthening SX-NRPB-232810-NC-RFQ / Pending institutional capacity to Request for Single Stage - One Hand Sanitizers and masks for TF / A8265 Post Limited 30,000.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 enhance the social protection Quotations Envelope data collectors on system CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-121879-CS-CQS / Component 2. Strengthening Consultant Marketing and institutional capacity to TF / A8265 Post Qualification Open - National 30,000.00 0.00 Canceled 2019-08-12 2019-08-07 2019-09-02 2019-10-16 2019-11-15 2019-12-20 2020-06-17 Communication for enhance the social protection Selection Household Survey system SX-NRPB-126429-CS-CQS / Component 2. Strengthening Marketing and Consultant institutional capacity to Communication strategy for TF / A8265 Post Qualification Limited 50,000.00 0.00 Canceled 2019-08-07 2019-08-07 2019-08-21 2019-08-07 2019-09-20 2019-10-25 2020-04-22 enhance the social protection integrated social registry Selection system system SX-NRPB-232785-CS-QCBS / Component 2. Strengthening Labor market Analysis/Study institutional capacity to Quality And Cost- Pending TF / A8265 Post Open - International 874,572.00 0.00 2021-05-05 2021-05-26 2021-07-09 2021-08-06 2021-09-05 2021-10-10 2021-11-14 2022-11-14 of unemployment benefit for enhance the social protection Based Selection Implementation NESC support system INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2. Strengthening Individual SX-NRPB-121871-CS-INDV / institutional capacity to Under TF / A8265 Post Consultant Open 160,000.00 0.00 2019-08-04 2021-05-13 2019-09-22 2019-10-13 2019-11-17 2020-05-15 Data Analyst enhance the social protection Implementation Selection system Page 1 Component 2. Strengthening Individual SX-NRPB-121873-CS-INDV / institutional capacity to TF / A8265 Post Consultant Open 160,000.00 0.00 Canceled 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 Social Officer enhance the social protection Selection system Component 2. Strengthening Individual SX-NRPB-121876-CS-INDV / institutional capacity to Pending TF / A8265 Post Consultant Open 160,000.00 0.00 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 Operations Manager enhance the social protection Implementation Selection system Component 2. Strengthening SX-NRPB-121878-CS-CDS / institutional capacity to Design of Integrated Social TF / A8265 Prior Direct Selection Direct 400,000.00 0.00 Canceled 2019-08-12 2019-08-22 2019-10-26 2020-04-23 enhance the social protection Registry Software system SX-NRPB-126055-CS-CDS / Component 3. Project DLI verification Training TF / A8265 Post Direct Selection Direct 50,000.00 118,382.00 Signed 2019-08-05 2019-08-03 2019-08-05 2019-08-03 2019-08-26 2019-09-06 2020-02-22 Management Program Component 2. Strengthening SX-NRPB-135375-CS-CDS / institutional capacity to Under Design and build Integrated TF / A8265 Post Direct Selection Direct 1,500,000.00 0.00 2019-09-30 2019-10-09 2019-10-10 2019-10-30 2019-12-14 2020-06-11 enhance the social protection Implementation Social Registry System system Component 2. Strengthening Individual SX-NRPB-147263-CS-INDV / institutional capacity to TF / A8265 Post Consultant Open 50,000.00 0.00 Canceled 2019-11-26 2019-12-02 2020-01-14 2020-02-04 2020-03-10 2020-09-06 Communication Strategy HLS enhance the social protection Selection system SX-NRPB-147265-CS-CDS / Component 3. Project TF / A8265 Post Direct Selection Direct 150,000.00 127,705.56 Signed 2019-11-29 2019-11-26 2019-12-09 2019-12-17 2020-02-12 2020-06-01 2020-08-10 Process re-engineering Management Component 2. Strengthening Individual SX-NRPB-162131-CS-INDV / institutional capacity to Under TF / A8265 Post Consultant Open 150,000.00 0.00 2020-02-28 2020-04-17 2020-05-08 2020-06-12 2020-12-09 50 Data Collectors HSL enhance the social protection Implementation Selection system SX-NRPB-177372-CS-CDS / Component 3. Project TF / A8265 Prior Direct Selection Direct 5,000.00 4,500.00 Signed 2020-06-02 2020-06-09 2020-06-12 2020-06-01 2020-08-16 2020-06-16 2021-02-12 Procurement Consultant Management SX-NRPB-185264-CS-CDS / Component 3. Project TF / A8265 Post Direct Selection Direct 50,000.00 44,400.00 Signed 2020-07-23 2020-04-01 2020-08-02 2020-07-31 2020-10-06 2020-08-17 2021-04-04 Communications Specialist Management SX-NRPB-192304-CS-CDS / Component 3. Project Under TF / A8265 Prior Direct Selection Direct 5,000.00 0.00 2020-09-10 2020-09-14 2020-09-20 2020-11-24 2021-05-23 Procurement Consultant 2 Management Implementation SX-NRPB-202553-CS-CDS / Component 3. Project TF / A8265 Post Direct Selection Direct 100,000.00 71,040.00 Signed 2020-11-02 2020-10-27 2020-11-12 2020-11-01 2021-01-16 2021-04-24 2021-07-15 Project Coordinator remote Management Component 2. Strengthening Individual SX-NRPB-232230-CS-INDV / institutional capacity to Pending TF / A8265 Post Consultant Open 50,000.00 0.00 2021-05-03 2021-06-21 2021-07-12 2021-08-16 2022-02-12 Social Officer 1 enhance the social protection Implementation Selection system Component 2. Strengthening Individual SX-NRPB-232453-CS-INDV / institutional capacity to Pending TF / A8265 Post Consultant Open 50,000.00 0.00 2021-05-03 2021-06-21 2021-07-12 2021-08-16 2022-02-12 Social Officer 2 enhance the social protection Implementation Selection system Component 2. Strengthening SX-NRPB-226035-CS-INDV / Individual institutional capacity to Communications Specialist: TF / A8265 Post Consultant Open 9,977.00 0.00 Canceled 2021-03-25 2021-04-26 2021-05-13 2021-06-03 2021-07-08 2022-01-04 enhance the social protection Erika Fortuno Selection system Individual SX-NRPB-232797-CS-INDV / Component 3. Project Pending TF / A8265 Post Consultant Open 90,000.00 0.00 2021-05-16 2021-07-04 2021-07-25 2021-08-29 2022-02-25 Project Assistant Management Implementation Selection Component 2. Strengthening SX-NRPB-232229-CS-CDS / institutional capacity to Under Process Re-Engineering TF / A8265 Post Direct Selection Direct 194,706.00 0.00 2021-04-30 2021-06-10 2021-05-10 2021-07-14 2022-01-10 enhance the social protection Implementation Consultants system Component 2. Strengthening SX-NRPB-234388-CS-INDV / Individual institutional capacity to Communication Specialist: TF / A8265 Post Consultant Open 18,010.00 0.00 Canceled 2021-05-16 2021-06-08 2021-07-04 2021-07-25 2021-08-29 2022-02-25 enhance the social protection Erika Fortuno Selection system Component 2. Strengthening Individual SX-NRPB-234937-CS-INDV / institutional capacity to Under TF / A8265 Post Consultant 168,000.00 0.00 2021-05-19 2021-05-24 2021-07-07 2021-07-28 2021-09-01 2022-02-28 Data Collectors enhance the social protection Implementation Selection system Component 2. Strengthening SX-NRPB-239257-CS-CDS / institutional capacity to Under Communications Specialist: TF / A8265 Post Direct Selection Direct 20,000.00 0.00 2021-06-14 2021-06-08 2021-06-24 2021-08-28 2022-02-24 enhance the social protection Implementation Erika Fortuno system Page 2 GOVERNMENT OF THE KINGDOM OF ESWATINI GENERAL PROCUREMENT NOTICE Country: Kingdom of Eswatini Project: Health System Strengthening for Human Capital Development Project Sector: Health Project ID No.: P168564 The Ministry of Health has received financing in the amount of US$20 Million amount equivalent from the World Bank toward the cost of the ESWATINI MINISTRY OF HEALTH SYSTEMS STRENGTHENING FOR HUMAN CAPITAL DEVELOPMENT PROJECT and it intends to apply part of the proceeds to payments for goods, works, related services and consulting services to be procured under this project. The project aims to to improve the coverage and quality of key reproductive, maternal, neonatal, child and adolescent health (RMNCAH), nutrition and NCD services (hypertension and diabetes) in Eswatini and will include the following components. Component 1: Improve health service delivery to increase the coverage and quality of health services to build human capital. Component 2. Increase community demand for RMNCAH, nutrition and NCD services. Component 3. Strengthen the MOH’s stewardship capacity to manage essential health and nutrition services and project activities. The project will broadly support the procurement of the following categories of items under the open international approach to market: Technical assistance and procurement of tablets/technology to develop, test and scale-up provider digital decision support tools for RMNCAH, International specialist neonatal nurses, procurement of commodities and equipment for nutrition and NCDs including micronutrient supplements and therapeutic foods, procurement of biomedical equipment and supplies including patient monitors, ICU beds, oxygen concentrators, waste skips, and disinfectant. Technical assistance to strengthen supportive supervision and mentorship for RMNCAH, nutrition and NCDs. Procurement of contracts financed by the proceeds of the proposed IBRD loan will be conducted through the procedures as specified in the World Bank’s Procurement Regulations for IPF Borrowers (July 2016) (Procurement Regulations), as amended from time to time, and is open to all eligible firms and individuals as defined in the Procurement Regulations. Specific procurement notices for contracts to be bid under the World Bank’s open international approach to market procedures and for contracts for consultancy services will be announced, as they become available, in UN Development Business and dgMarket, local and regional newspapers. Address of the Project Implementing Unit Ministry of Health Headquarters P. O. Box 5 Mbabane Telephone number: +268 2404 3757 Fax number: +268 2404 2092 E-mail address: smz1157@gmail.com PROCUREMENT Eswatini : Health System Strengthening for Human Capital Development in Eswatini PLAN General Information Country: Eswatini Bank’s Approval Date of the Original Procurement Plan: 2021-03-09 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168564 GPN Date: 2021-03-03 Project Name: Health System Strengthening for Human Capital Development in Eswatini Loan / Credit No: IBRD / 91260 M Executing Agency(ies): inistry of Health WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Improve health SZ-MOH-225077-GO-RFB / service delivery to increase Under Single Stage - One Procurement of Primary IBRD / 91260 the coverage and quality of Post Request for Bids Open - International 1,162,080.00 0.00 Implementati 2021-04-01 2021-04-06 2021-04-06 2021-04-16 2021-05-18 2021-06-17 2021-07-22 2022-01-18 Envelope Health Care goods health services to build on human capita l Component 1: Improve health SZ-MOH-225079-GO-RFB / service delivery to increase Under Single Stage - One Supply and Delivery of IBRD / 91260 the coverage and quality of Post Request for Bids Open - International 759,000.00 0.00 Implementati 2021-04-01 2021-04-06 2021-04-06 2021-04-16 2021-05-18 2021-06-17 2021-07-22 2022-01-18 Envelope Vehicles and Waste kips health services to build on human capita l Component 3. Strengthen the SZ-MOH-228885-GO-RFQ / MOH’s stewardship capacity Under Request for Single Stage - One Office Equipment & Supplies IBRD / 91260 to manage essential health Post Limited 20,000.00 0.00 Implementati 2021-04-24 2021-06-19 2021-12-16 Quotations Envelope for PIU and nutrition services and on project activ ities Component 3. Strengthen the SZ-MOH-229665-GO-RFQ / MOH’s stewardship capacity Under Request for Single Stage - One Supply and Delivery of Office IBRD / 91260 to manage essential health Post Limited 7,000.00 0.00 Implementati 2021-04-25 2021-04-28 2021-06-20 2021-12-17 Quotations Envelope Furniture and nutrition services and on project activ ities Component 1: Improve health SZ-MOH-234158-GO-RFB / service delivery to increase Under Single Stage - One Supply and delivery of IBRD / 91260 the coverage and quality of Post Request for Bids Open - National 990,000.00 0.00 Implementati 2021-05-18 2021-05-19 2021-05-23 2021-05-20 2021-07-04 2021-08-03 2021-09-07 2022-03-06 Envelope computers and IT Equipment health services to build on human capita l NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Improve health SZ-MOH-229232-CS-CQS / service delivery to increase Consultant Environmental and Social Under IBRD / 91260 the coverage and quality of Post Qualification Open - National 20,000.00 0.00 2021-04-14 2021-04-15 2021-05-05 2021-04-16 2021-06-18 2021-05-17 2021-07-18 2021-08-22 2022-02-18 management plan Implementation health services to build Selection Consultancy human capita l Component 3. Strengthen the SZ-MOH-229365-CS-INDV / MOH’s stewardship capacity Consultant Under Consultancy for Procurement IBRD / 91260 to manage essential health Post Qualification Open - International 100,000.00 0.00 2021-04-16 2021-04-28 2021-05-07 2021-05-04 2021-06-20 2021-06-17 2021-07-20 2021-08-24 2022-02-20 Implementation Strategy and nutrition services and Selection project activ ities INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Improve health service delivery to increase Individual SZ-MOH-215198-CS-INDV / IBRD / 91260 the coverage and quality of Post Consultant Open 90,000.00 0.00 Canceled 2021-01-20 2020-06-30 2021-03-10 2021-03-31 2021-05-05 2021-11-01 Human Capital Liaison health services to build Selection human capita l Component 1: Improve health service delivery to increase Individual SZ-MOH-223867-CS-INDV / IBRD / 91260 the coverage and quality of Post Consultant Open 90,000.00 103,040.00 Signed 2021-03-09 2021-03-10 2021-04-27 2021-02-09 2021-05-18 2021-03-01 2021-06-22 2021-03-01 2021-12-19 Hiring of Project Engineer health services to build Selection human capita l Component 1: Improve health SZ-MOH-225070-CS-INDV / service delivery to increase Individual RE-ADVERTISEMENT FOR Under IBRD / 91260 the coverage and quality of Post Consultant Open 90,000.00 0.00 2021-03-19 2021-03-18 2021-05-07 2021-04-28 2021-05-28 2021-07-02 2021-12-29 HUMAN CAPITAL LIAISON Implementation health services to build Selection OFFICER human capita l Page 1 SZ-MOH-228097-CS-INDV / Component 1: Improve health Environmental and Social service delivery to increase Individual impact assessment for Central IBRD / 91260 the coverage and quality of Post Consultant Open 20,000.00 0.00 Canceled 2021-04-12 2021-04-08 2021-05-31 2021-06-21 2021-07-26 2022-01-22 Medical Stores operation health services to build Selection centre human capita l Component 1: Improve health service delivery to increase Individual SZ-MOH-234589-CS-INDV / Under IBRD / 91260 the coverage and quality of Post Consultant Open 255,000.00 0.00 2021-05-17 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2022-02-26 Clinical Technical Advisor Implementation health services to build Selection human capita l Component 1: Improve health SZ-MOH-234871-CS-INDV / service delivery to increase Individual Under NCD Decentralization IBRD / 91260 the coverage and quality of Post Consultant Open 225,000.00 0.00 2021-05-18 2021-05-18 2021-07-06 2021-07-27 2021-08-31 2022-02-27 Implementation Coordinator health services to build Selection human capita l Component 2. Increase SZ-MOH-235046-CS-INDV / Individual community demand for Under Reginal Health Management IBRD / 91260 Post Consultant Open 180,000.00 0.00 2021-05-18 2021-06-11 2021-07-06 2021-07-27 2021-08-31 2022-02-27 RMNCAH, nutrition and NCD Implementation Programme Advisor Selection services Page 2 PROCUREMENT PLAN Project information: Country: Bangladesh Project Name: Bangladesh COVID-19 Emergency Preparedness and Response Project P-number: P173757 Project Implementation agency: (i) Ministry of Health and Family Welfare (MoHFW) (ii) Central Medical Stores Depot (CMSD) (iii) Public Works Department (PWD) Period covered by this Procurement Plan: Entire Project Period Preamble In accordance with paragraph 5.9 of the World Bank Procurement Regulations for IPF Borrowers, July 2016, revised November 2017 and August 2018 (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents (SPDs) shall be used for goods, works and non- consulting services where international competition is required and for consulting services, including their respective forms of contract. National Procurement Arrangements: In accordance with paragraph 5.3 of the World Bank Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan, the country’s own procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti- Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Act 2006 and the Public Procurement Rules 2008, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: i. Lottery in award of contracts shall not be allowed; ii. Bidders’ qualification[s]/experience requirement[s] shall be mandatory; iii. Bids shall not be rejected based on percentage above or below the estimated cost; iv. Model Bidding Documents agreed with the Bank shall be used for all national open competitive procurement; v. The eligibility of bidders shall be as defined under Section III of the World Bank Procurement Regulations for IPF Borrowers: accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. vi. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. vii. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. As per paragraph 5.4 of the Procurement Regulations, the “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework” as attached to this document shall form part of the Model Bidding Documents. Leased Assets: Not Applicable. Procurement of Second-Hand Goods: as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables - Applicable” Domestic preference: as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works) as follows: Goods: Applicable; Works: Not applicable. Hands-on Expanded Implementation Support (HEIS): as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Bank’s Procurement Prior Review Thresholds: As this is an emergency response project, there will be no prior review for all procurement during the immediate response period. The project will also have increased threshold for Request for Quotations (RFQ) and national procurement, as applicable in emergency projects. Fraud and Corruption (F&C) Checklist: Fraud and Corruption (F&C) checklist, as developed and provided by the Bank, shall be properly filled in during the evaluation and be attached with the evaluation report in case of contracts following national competitive procurement and request for quotations. Attachment 1 Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. Title of the person signing the Letter: PROCUREMENT Bangladesh : Bangladesh: COVID-19 Emergency Response and Pandemic Preparedness Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2020-05-25 2021-05-16 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173757 GPN Date: 2020-07-21 Project Name: Bangladesh: COVID-19 Emergency Response and Pandemic Preparedness Project Loan / Credit No: IDA / 66050, IDA / 68460, COFN / C1850 D Executing Agency(ies): irectorate General of Health Services WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PACKAGE GD-1 / Procuring of Personal Protective Component 1: Emergency IDA / 66050 Post Direct Selection Direct 3,762,489.51 3,760,684.62 Signed 2020-05-16 2020-04-07 2020-05-16 2020-04-12 2020-05-21 2020-05-19 2020-05-28 Equipment (PPE), KN95, N95 COVID-19 Response Mask and Hand Gloves PACKAGE GD-2 / Supplying Component 1: Emergency IDA / 66050 Post Direct Selection Direct 2,849,835.56 2,826,523.20 Signed 2020-05-16 2020-04-08 2020-05-16 2020-04-12 2020-05-21 2020-05-19 2020-05-30 PPE for Corona Pandemic COVID-19 Response PACKAGE GD-5 / Procuring Component 1: Emergency N95 Masks for Using Corona IDA / 66050 Post Direct Selection Direct 441,606.75 412,201.30 Signed 2020-05-18 2020-04-08 2020-05-18 2020-04-12 2020-05-23 2020-04-17 2020-06-21 COVID-19 Response Pandemic PACKAGE GD-6 / Supplying Pulse Oxymeter for Measure Component 1: Emergency IDA / 66050 Post Direct Selection Direct 370,000.00 370,000.00 Signed 2020-05-17 2020-05-04 2020-05-18 2020-05-04 2020-05-21 2020-05-09 2020-06-30 Critical Patient through COVID-19 Response Masimo PACKAGE GD-10 / Procurement of Automated Component 1: Emergency Request for Modern ICU Bed (Adult+Paedi) IDA / 66050 Post 1,913,629.25 0.00 Canceled 2020-05-21 2020-05-27 2020-06-18 COVID-19 Response Quotations Strengthening Patient Management PACKAGE GD-15 / Supplying Component 1: Emergency Emergency Ventilator with all IDA / 66050 Post Direct Selection Direct 6,206,046.86 2,320,104.46 Signed 2020-05-18 2020-05-04 2020-05-19 2020-05-05 2020-05-27 2020-05-27 2020-06-18 COVID-19 Response Standard Accessories PACKAGE GD-16 / Supplying Component 2: Supporting Compact Gas Powered IDA / 66050 National and Sub-national, Post Direct Selection Direct 2,349,347.91 2,343,658.82 Signed 2020-05-19 2020-05-06 2020-05-20 2020-05-07 2020-05-28 2020-05-27 2020-06-24 Ventilator for Patient Prevention and Preparedness Monitoring PACKAGE GD-13 / Component 2: Supporting Procurement of Five & Three IDA / 66050 National and Sub-national, Post Direct Selection Direct 587,800.00 584,736.99 Signed 2020-05-25 2020-05-20 2020-05-26 2020-05-21 2020-05-30 2020-05-28 2020-06-06 Functions Electric Hospital Prevention and Preparedness Bed PACKAGE GD_3 / Purchasing Component 1: Emergency IDA / 66050 Post Direct Selection Direct 1,177,554.00 2,291,839.23 Signed 2020-06-20 2020-05-14 2020-06-21 2020-05-17 2020-06-28 2020-05-20 2020-07-15 rt-PCR Kit Using for Test Labs COVID-19 Response PACKAGE GD-24 / Procuring Component 1: Emergency UN Agencies Oxygen Concentrator through IDA / 66050 Post Direct 647,709.70 0.00 Canceled 2020-05-30 2020-06-01 2020-06-07 2020-06-30 COVID-19 Response (Direct) UNICEF PACKAGE GD-8 / Supplying Infrared Thermometer and Component 1: Emergency IDA / 66050 Post Direct Selection Direct 1,089,270.98 1,085,740.91 Signed 2020-05-18 2020-04-09 2020-05-18 2020-04-12 2020-05-24 2020-04-19 2020-05-25 KN95 Masks for Corona COVID-19 Response Pandemic PACKAGE GD-3 / Purchasing Component 1: Emergency IDA / 66050 Post Direct Selection Direct 1,177,554.00 0.00 Canceled 2020-05-24 2020-05-15 2020-05-25 2020-05-17 2020-06-02 2020-06-30 rt-PCR Kit Using for Test Labs COVID-19 Response PACKAGE GD-29 / Management of COVID-19 Component 1: Emergency UN Agencies IDA / 66050 Post Direct 18,035,117.00 10,852,290.65 Signed 2020-07-22 2020-06-18 2020-07-28 2020-06-30 2020-09-02 2020-11-26 2021-03-01 Cases through Upgradtion of COVID-19 Response (Direct) Oxygen Supply System PACKAGE GD-28 / Procuring Component 1: Emergency UN Agencies Medical goods through World IDA / 66050 Post Direct 2,923,851.00 2,923,951.00 Signed 2020-06-10 2020-05-18 2020-06-10 2020-05-20 2020-07-13 2020-06-08 2020-12-31 COVID-19 Response (Direct) Health Organization PACKAGE GD24 / Procuring Oxygen Concentrator and Component 1: Emergency UN Agencies IDA / 66050 Post Direct 10,000,000.00 9,164,927.51 Signed 2020-06-21 2020-05-04 2020-06-22 2020-06-03 2020-07-16 2020-06-08 2021-01-12 other Emergency Medical COVID-19 Response (Direct) Goods through UNICEF PACKAGE GD-7 / Purchasing Component 1: Emergency Request for Single Stage - One Medicines for Treatment of IDA / 66050 Post Limited 1,177,634.00 0.00 Canceled 2020-05-19 2020-05-25 2020-11-28 COVID-19 Response Quotations Envelope COVID Patients Component 3: PACKAGE GD-23 / Supplying Implementation Management Request for Single Stage - One computer and related service IDA / 66050 Post Limited 353,296.20 0.00 Canceled 2020-06-02 2020-06-08 2020-06-30 and Monitoring and Quotations Envelope for office operation Evaluation PACKAGE GD-21 / Procuring rtPCR Machine with Component 1: Emergency IDA / 66050 Post Direct Selection Direct 2,355,208.00 0.00 Canceled 2020-05-27 2020-05-28 2020-06-01 2020-06-29 accessories for Identified COVID-19 Response COVID Patient Page 1 BD-DGHS-227379-GD34-GO- Under UN / Strengthening of Component 1: Emergency UN Agencies IDA / 68460 Prior Direct 2,737,415.25 0.00 Implementati 2021-04-06 2021-06-13 2021-04-11 2021-06-20 2021-05-16 2023-06-30 National Control Laboratory of COVID-19 Response (Direct) on DGDA BD-DGHS-234145-GO-DIR / Pending Component 1: Emergency Procurement of Modern IDA / 66050 Prior Direct Selection Direct 4,822,133.00 0.00 Implementati 2021-05-20 2021-05-25 2021-07-06 2023-06-30 COVID-19 Response Microbiology Lab with RT-PCR on BD-DGHS-234723-GO-DIR / Pending Component 1: Emergency Installation of ICU of 10 IDA / 66050 Prior Direct Selection Direct 3,185,910.90 0.00 Implementati 2021-05-16 2021-05-20 2021-06-28 2021-12-25 COVID-19 Response Medical College Hospital on BD-DGHS-235881-GO-DIR / Pending Component 1: Emergency Purchase Vaccine for COVID- IDA / 68460 Prior Direct Selection Direct 203,030,883.48 0.00 Implementati 2021-05-23 2021-05-31 2021-07-20 2022-01-16 COVID-19 Response 19 on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PACKAGE NCS-4 / Appointing C&F Agent for Component 1: Emergency clearing emergency medical IDA / 66050 Post Direct Selection Direct 471,803.60 32,383.00 Signed 2020-08-16 2020-08-24 2020-08-17 2020-09-03 2020-08-25 2020-09-13 2020-10-29 COVID-19 Response goods imported through UNICEF, WHO & Masimo DGHSCOVID-19ERPPNCS-5 / HR and Transport Hiring for Component 1: Emergency UN Agencies IDA / 66050 Prior Direct 14,135,868.00 0.00 Canceled 2021-02-18 2021-03-09 2021-02-21 2021-03-14 2021-05-30 2022-12-30 COVID-19 Emergency COVID-19 Response (Direct) Response through UN Agency DGHSCOVID-19NCS-7 / Pending Component 1: Emergency Hiring C&F Agent for clearing IDA / 66050 Post Direct Selection Direct 112,358.30 0.00 Implementati 2021-03-29 2021-04-01 2021-05-14 2021-11-10 COVID-19 Response the medical goods of UNICEF on Component 3: Pending DGHS/COVID-19/ERPP/NCS- Implementation Management Request for Single Stage - One IDA / 66050 Post Limited 3,546.00 0.00 Implementati 2021-06-09 2021-06-24 2021-08-30 9 / Vehicle Rental for PIU and Monitoring and Quotations Envelope on Evaluation DGHS/COVID-19ERPP/NCS- Pending Component 1: Emergency Single Stage - One 10 / Rental Vehicle for Lab COFN / C1850 Post Request for Bids Open - National 142,468.00 0.00 Implementati 2021-06-24 2021-06-27 2021-07-15 2021-07-20 2021-08-10 2022-05-30 COVID-19 Response Envelope Call Centre on DGHS/COVID-19ERPP/NCS-8 Pending Component 1: Emergency Request for Single Stage - One / Vehicle Rental for COVID-19 COFN / C1850 Post Limited 5,859.00 0.00 Implementati 2021-06-10 2021-06-28 2021-08-31 COVID-19 Response Quotations Envelope Emergency on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PACKAGE SD-1 / Component 3: Development of CoronaBD Implementation Management Mobile App and National IDA / 66050 Post Direct Selection Direct 571,144.73 559,651.59 Signed 2020-05-18 2020-04-10 2020-05-20 2020-04-10 2020-05-28 2020-04-15 2020-06-28 and Monitoring and Corona Care System Central Evaluation Web Application PACKAGE SD -2 / Develop TVC for awareness, education, Component 1: Emergency IDA / 66050 Post Direct Selection Direct 68,759.25 68,655.95 Signed 2020-05-20 2020-04-12 2020-05-21 2020-04-12 2020-05-25 2020-04-15 2020-05-31 risk communication & counter COVID-19 Response misinformation Component 3: Individual PACKAGE SD-3 / Implementation Management IDA / 66050 Post Consultant Direct 112,699.11 112,735.19 Signed 2020-05-20 2020-04-22 2020-05-22 2020-04-23 2020-05-22 2020-04-30 2020-05-28 2020-04-30 2022-05-02 Procurement Specialist and Monitoring and Selection Evaluation Component 3: PACKAGE SD-6 / Risk Implementation Management Communication and IDA / 66050 Post Direct Selection Direct 58,789.50 0.00 Canceled 2020-05-24 2020-05-28 2020-06-05 2020-06-30 and Monitoring and Community Engagement Evaluation PACKAGE SD-7 / Awareness Component 2: Supporting Building TVC Regarding IDA / 66050 National and Sub-national, Post Direct Selection Direct 88,324.05 100,251.21 Signed 2020-05-22 2020-05-04 2020-05-23 2020-05-05 2020-05-25 2020-05-13 2020-06-15 Disposal of COVID-19 Dead Prevention and Preparedness Bodies Component 3: PACKAGE SD-4 / AI Based Implementation Management Surveillance and Contact IDA / 66050 Post Direct Selection Direct 58,880.90 0.00 Canceled 2020-05-20 2020-05-22 2020-05-25 2020-06-30 and Monitoring and Tracing Evaluation PACKAGE SD-8 / Program for Eid-ul-Fitar to Raise Mass Component 1: Emergency Awareness of COVID-19 using IDA / 66050 Post Direct Selection Direct 62,356.67 0.00 Canceled 2020-05-23 2020-05-23 2020-05-24 2020-05-31 COVID-19 Response Mainstreaming Media including Social Media Individual PACKAGE SD-15 / ICS- Junior Component 1: Emergency IDA / 66050 Post Consultant Direct 33,974.76 0.00 Canceled 2020-07-28 2021-01-25 2020-08-16 2020-08-23 2020-09-27 2021-03-26 Financial Management COVID-19 Response Selection Page 2 DGHSCOVID-19ERPPCSD-5 / Individual Component 1: Emergency Selection of Environmental IDA / 66050 Post Consultant Direct 28,370.23 7,554.93 Signed 2021-01-31 2021-01-25 2021-02-01 2021-02-03 2021-02-04 2021-02-09 2021-02-10 2021-02-10 2021-05-30 COVID-19 Response Management Specialist Selection DGHSCOVID-19ERPPCSD6 / Individual Component 1: Emergency Selection of Social IDA / 66050 Post Consultant Direct 28,370.23 5,466.13 Signed 2021-01-31 2021-01-25 2021-02-03 2021-02-08 2021-02-10 2021-02-10 2021-02-25 2021-02-11 2021-06-30 COVID-19 Response Development Specialist Selection Individual DGHSCOVID-19ERPPSD-08 / Component 1: Emergency Under IDA / 66050 Post Consultant Direct 85,110.70 0.00 2021-01-31 2020-06-08 2021-02-09 2021-02-09 2021-02-25 2022-06-30 Selection of M&E Specialist COVID-19 Response Implementation Selection DGHS/COVID- Individual 19/ERPP/PACKAGE CS-7 / Component 1: Emergency IDA / 66050 Post Consultant Direct 11,794.84 9,304.80 Signed 2021-02-08 2021-01-25 2021-02-10 2021-01-25 2021-02-11 2021-02-03 2021-02-14 2021-02-08 2021-08-31 Financial Management COVID-19 Response Selection Specialist (Jr.) Individual PACKAGE SD-9 / Component 1: Emergency IDA / 66050 Post Consultant Direct 112,792.16 0.00 Canceled 2020-07-22 2020-07-25 2020-08-01 2020-09-08 2022-09-07 Procurement Consultant COVID-19 Response Selection Component 3: PACKAGE SD-5 / Operational Implementation Management IDA / 66050 Post Direct Selection Direct 58,690.90 0.00 Canceled 2020-05-21 2020-05-22 2020-05-26 2020-06-23 and Epidemiological Research and Monitoring and Evaluation Individual PACKAGE SD-11 / Financial Component 1: Emergency IDA / 66050 Post Consultant Direct 112,792.16 0.00 Canceled 2020-06-25 2020-06-29 2020-07-05 2020-07-12 2022-07-11 Management Specialist COVID-19 Response Selection BD-DGHS-227366-CS- Individual Component 1: Emergency Under 6.1INDV / Social Development IDA / 66050 Post Consultant Open 27,716.18 0.00 2021-04-04 2021-04-07 2021-05-05 2021-05-16 2021-06-01 2022-03-31 COVID-19 Response Implementation Specialist Selection BD-DGHS-227361-CS-INDV Individual Component 1: Emergency Under / Financial Management IDA / 66050 Post Consultant Open 165,117.68 0.00 2021-04-04 2021-04-12 2021-05-04 2021-05-14 2021-06-30 2023-05-31 COVID-19 Response Implementation Specialist Selection BD-DGHS-227363-CS- Individual Component 1: Emergency Under 5.1INDV / Environmental IDA / 66050 Post Consultant Open 20,050.00 0.00 2021-04-04 2021-04-07 2021-06-07 2021-06-10 2021-06-20 2021-12-17 COVID-19 Response Implementation Management Specialist Selection Page 3 PROCUREMENT PLAN (Textual Part) Project information: P168119 – Improving Resilience and Emergency Response Project Project Implementation agency: General Inspectorate of the Romanian Police Date of the Procurement Plan: May 2019 Period covered by this Procurement Plan: May 2019 – December 2025 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. As part of project preparations and negotiations, it has been agreed that the Bank’s Standard Procurement Documents or other documents agreed with the Bank will be used for procurement with national market approach. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable . PROCUREMENT Romania : Improving Resilience and Emergency Response Project PLAN General Information Country: Romania Bank’s Approval Date of the Original Procurement Plan: 2021-01-06 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168119 GPN Date: Project Name: Improving Resilience and Emergency Response Project Loan / Credit No: IBRD / 89490 General Inspectorate of the Romanian Police Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RO-GIRP-234781-GO-RFB / 2 x Human biological sample processing workflow for Pending disaster victim identification Operational Readiness and Single Stage - One IBRD / 89490 Post Request for Bids Open - International 358,000.00 0.00 Implementati 2022-02-22 2022-02-27 2022-04-10 2022-05-10 2022-06-14 2022-12-11 by judicial genetic methods Public Awareness Envelope on (fully integrated system consisting of DNA extraction, DNA quantification steps) RO-GIRP-207437-GO-RFB / Pending Operational Readiness and Single Stage - One Specifically equipment for IBRD / 89490 Post Request for Bids Open - National 340,000.00 0.00 Implementati 2021-12-13 2021-12-18 2022-01-29 2022-02-28 2022-04-04 2022-10-01 Public Awareness Envelope disaster victims identification on RO-GIRP-221756-GO-RFQ / Pending Request for Single Stage - One Minor equipment for the IBRD / 89490 Project Management Post Open - National 2,500.00 0.00 Implementati 2021-08-14 2021-10-09 2021-11-08 Quotations Envelope office on Pending RO-GIRP-221753-GO-RFQ / Request for Single Stage - One IBRD / 89490 Project Management Post Open - National 55,000.00 0.00 Implementati 2021-11-13 2022-01-08 2022-05-08 Vehicles procurement Quotations Envelope on Pending RO-GIRP-207463-GO-RFQ / Request for Single Stage - One IBRD / 89490 Project Management Post Open - National 90,000.00 0.00 Implementati 2021-08-28 2021-10-23 2021-11-22 IT equipment procurement Quotations Envelope on Pending RO-GIRP-207453-GO-RFQ / Request for Single Stage - One IBRD / 89490 Project Management Post Open - National 15,000.00 0.00 Implementati 2021-08-21 2021-10-16 2021-11-15 Furniture procurement Quotations Envelope on RO-GIRP-207467-GO-RFQ / Pending Request for Single Stage - One Procurement of Office IBRD / 89490 Project Management Post Open - National 90,000.00 0.00 Implementati 2021-09-04 2021-10-30 2021-11-29 Quotations Envelope supplies on RO-GIRP-207446-GO-RFB / Pending High-performance video Operational Readiness and Single Stage - One IBRD / 89490 Post Request for Bids Open - International 350,000.00 0.00 Implementati 2021-12-20 2021-12-25 2022-02-05 2022-03-07 2022-04-11 2022-10-08 cameras FLIR and emission- Public Awareness Envelope on reception systems Pending RO-GIRP-207447-GO-RFQ / Operational Readiness and Request for Single Stage - One IBRD / 89490 Post Open - National 50,000.00 0.00 Implementati 2021-11-27 2022-01-22 2022-07-21 Mountain climbing kit Public Awareness Quotations Envelope on RO-GIRP-207444-GO-RFB / 2 x Human biological sample processing workflow for disaster victim identification Pending by judicial genetic Operational Readiness and Single Stage - One IBRD / 89490 Post Request for Bids Open - International 442,000.00 0.00 Implementati 2022-02-14 2022-02-19 2022-04-02 2022-05-02 2022-06-06 2022-12-03 methods(fully integrated Public Awareness Envelope on system consisting of PCR amplification/ PCR product/amplicons separation steps) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending RO-GIRP-207471-NC-RFQ / Request for Single Stage - One IBRD / 89490 Project Management Post Open - National 10,000.00 0.00 Implementati 2021-11-20 2022-01-15 2022-09-19 Written Translation Services Quotations Envelope on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Enhance the Resilience of RO-GIRP-207430-CS-CQS / Consultant selected Romanian Police Pending Selection of a firm to provide IBRD / 89490 Post Qualification Open - National 35,424.81 0.00 2021-12-17 2022-01-07 2022-02-20 2022-03-22 2022-04-26 2022-10-23 Infrastructure to be used in Implementation technical verification services Selection Disaster Response Consultant RO-GIRP-207452-CS-CQS / Operational Readiness and Pending IBRD / 89490 Post Qualification Open - National 100,000.00 0.00 2021-10-27 2021-11-17 2021-12-31 2022-01-30 2022-03-06 2022-09-02 Public information campaigns Public Awareness Implementation Selection Page 1 RO-GIRP-207432-CS-CQS / Technical Surveyors for Piatra Enhance the Resilience of Neamţ Municipal Police & Consultant selected Romanian Police Pending Traffic Police Service no. 14 / IBRD / 89490 Post Qualification Open - National 32,620.30 0.00 2022-01-28 2022-02-18 2022-04-03 2022-05-03 2022-06-07 2022-12-04 Infrastructure to be used in Implementation Vaslui Municipal Police/ Selection Disaster Response Râmnicu Sărat Municipal Police / Iași Municipal Police RO-GIRP-207431-CS-CQS / Technical Surveyors for Enhance the Resilience of Precinct no. 6, Bucharest / Consultant selected Romanian Police Pending Precinct no. 7, Bucharest / IBRD / 89490 Post Qualification Open - National 25,848.55 0.00 2022-01-14 2022-02-04 2022-03-20 2022-04-19 2022-05-24 2022-11-20 Infrastructure to be used in Implementation Precinct no. 13, Bucharest / Selection Disaster Response Ploiești Municipal Police / Precinct no. 3, Brașov RO-GIRP-207425-CS-CQS / Tendering for design and Enhance the Resilience of Consultant technical assistance for Public selected Romanian Police Pending IBRD / 89490 Post Qualification Open - National 319,670.40 0.00 2021-11-24 2021-12-01 2022-01-14 2022-02-13 2022-03-20 2022-09-16 Order and Traffic Police Infrastructure to be used in Implementation Selection Bucharest Operational Center Disaster Response Headquarters RO-GIRP-207429-CS-CQS / Tendering for design and technical assistance for Enhance the Resilience of Precinct no. 14, Bucharest / Consultant selected Romanian Police Pending Precinct no. 9, Bucharest / IBRD / 89490 Post Qualification Open - National 393,085.21 0.00 2021-08-19 2021-09-09 2021-10-23 2021-11-22 2021-12-27 2022-06-25 Infrastructure to be used in Implementation Precinct no. 3, Bucharest / Selection Disaster Response Precinct no. 18, Bucharest / Popești Leordeni Town Police / Pitești Municipal Police Consultant RO-GIRP-207451-CS-CQS / Operational Readiness and Pending IBRD / 89490 Post Qualification Open - National 20,000.00 0.00 2021-09-13 2021-10-04 2021-11-17 2021-12-17 2022-01-21 2022-07-20 Opinion poll Public Awareness Implementation Selection Consultant RO-GIRP-207472-CS-CQS / Pending IBRD / 89490 Project Management Post Qualification Open - National 20,000.00 0.00 2021-11-29 2021-12-20 2022-02-02 2022-03-04 2022-04-08 2022-05-08 External audit for year one Implementation Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RO-GIRP-221737-CS-INDV / Individual Under Externally contracted IBRD / 89490 Project Management Post Consultant Open 93,000.00 0.00 2021-07-19 2021-06-09 2021-09-06 2021-09-27 2021-11-01 2025-12-31 Implementation personnel - 1 x Secretary Selection RO-GIRP-221739-CS-INDV / Individual Under Externally contracted IBRD / 89490 Project Management Post Consultant Open 74,400.00 0.00 2021-07-19 2021-06-09 2021-09-06 2021-09-27 2021-11-01 2025-12-31 Implementation personnel - 1 x Driver Selection RO-GIRP-221748-CS-INDV / Individual Under Externally contracted IBRD / 89490 Project Management Post Consultant Open 128,000.00 0.00 2021-07-16 2021-06-09 2021-09-03 2021-09-24 2021-10-29 2025-12-31 Implementation personnel - 1 Architect Selection RO-GIRP-221740-CS-INDV / Individual Externally contracted Under IBRD / 89490 Project Management Post Consultant Open 256,000.00 0.00 2021-07-09 2021-06-09 2021-08-27 2021-09-17 2021-10-22 2025-12-31 personnel - 2 x Procurement Implementation Selection experts RO-GIRP-221746-CS-INDV / Individual Externally contracted Under IBRD / 89490 Project Management Post Consultant Open 128,000.00 0.00 2021-07-16 2021-06-09 2021-09-03 2021-09-24 2021-10-29 2025-12-31 personnel - 1 x Construction Implementation Selection Engineer RO-GIRP-221751-CS-INDV / Individual Externally contracted Under IBRD / 89490 Project Management Post Consultant Open 256,000.00 0.00 2021-07-23 2021-06-09 2021-09-10 2021-10-01 2021-11-05 2025-12-31 personnel - 2 x Engineer Implementation Selection (mechanical) RO-GIRP-221742-CS-INDV / Externally contracted Individual Under personnel - 2 x Safeguards IBRD / 89490 Project Management Post Consultant Open 248,000.00 0.00 2021-07-30 2021-06-09 2021-09-17 2021-10-08 2021-11-12 2025-12-31 Implementation experts (social and Selection environmental ) Page 2 PROCUREMENT PLAN (Textual Part) Project information: West Bengal Electricity Distribution Grid Modernization Project (P170590) Project Implementation agency: West Bengal State Electricity Distribution Company Limited (WBSEDCL) Date of the Procurement Plan: 22 June 2020 Period covered by this Procurement Plan: June 2020 - until publication of next revision Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. Most of the procurements will follow NPP procedure using Bank’s National Procurement Document. National Procurement Arrangements: National competition for the procurement of goods, works and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3 – 5.6 of Section V of the Regulations and the following provisions: a. Only the model bidding documents for National Competitive Procurement agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding. b. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. c. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises or enterprises from any given State. d. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. e. GeM set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations1 method. f. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. g. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. h. The Request for Bids/Request for Proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. j. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety risks and impacts. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: will be applicable for those contracts identified in the Procurement Plan table; Works: Not applicable Other Relevant Procurement Information. Procurement Plan: The Implementing Agencies shall prepare a procurement plan and will submit to the Bank through STEP portal for all activities barring which special exemption given by the Bank for not using 1 To the extent possible, competitive bidding/e-RA options will be used while using GeM STEP. The approved procurement plan shall be automatically disclosed to the public through STEP portal. Project Procurement Strategy for Development (PPSD): PPSD has been prepared by the Borrower with Bank’s support and outcome of PPSD is updated in the procurement plan. Procurement Methods/Threshold Procurement Approaches and Thresholds (US$ equivalent) Methods Open international (Works) Any value Open national (Works) Up to 40 million Open international (goods, IT Any value system, and non-consulting services) Open national (goods, IT system, Up to 10 million and non-consulting services) National request for quotation Up to 100,000 (works, goods , IT & NCS) Direct selection No threshold; For goods/non-consulting services: According to paragraphs 6.8–6.10 of the Regulations; For consultants: According to paragraphs 7.13–7.15 of the Regulations Shortlist of national consultants Up to 800,000 Procurement prior-review thresholds. The World Bank will prior review the following contracts: (a) Works: All contracts more than US$10 million equivalent (b)Goods and IT system: All contracts more than US$2 million equivalent (c) Non-consulting services: All contracts more than US$2 million equivalent (d)Consultants (Firms): All contracts >US$1 million equivalent and (e) Consultants (Individual): All contracts >US$300,000 equivalent (f) Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: • procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulation for Borrowers • competitive dialogue; • sustainable procurement; • selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations for Borrowers; and • best and final offer. Post Review: All contracts not subject to prior review by the World Bank will be subject to post review during the project’s Implementation Support Missions (ISM) and/or special post review missions including missions by consultants hired by the Bank. The World Bank may conduct, at any time, independent procurement reviews of all the contracts financed under the loan. Also, if there are internal audits carried out for sample procurements, the Borrower may consult with the World Bank to include the Bank’s requirements under the TOR for such audits, in which case the Bank will only review the internal audit reports. Tentative Procurement plan (First 03 months) S.N Activity Name of Est. Meth Bank Oversight Expected Expected . No Activity Cost od/A date of date of (US$ ppro publication signing of Million ach of IFB/ RFP contract ) 1 HVDS-1 HVDS in 11.87 NCB Prior review Aug-20 Nov-20 Alipurduar (S & District I) HVDS-2 HVDS in 11.87 NCB Prior review Aug-20 Nov-20 Coochbehar (S & District I) 2 HVDS-3 HVDS in 11.87 NCB Prior review Aug-20 Nov-20 Jalpaiguri District (S & I) HVDS-4 HVDS in 11.87 NCB Prior review Aug-20 Nov-20 Darjeeling (S & District I) 3 HVDS-5 HVDS in Uttar 11.87 NCB Prior review Aug-20 Nov-20 Dinajpur District S.N Activity Name of Est. Meth Bank Oversight Expected Expected . No Activity Cost od/A date of date of (US$ ppro publication signing of Million ach of IFB/ RFP contract ) (S & I) HVDS-6 HVDS in Dakshin 11.87 NCB Prior review Aug-20 Nov-20 Dinajpur District (S & I) 4 HVDS-7 HVDS in Malda 11.87 NCB Prior review Aug-20 Nov-20 District (S & I) HVDS-8 HVDS in Nadia 11.87 NCB Prior review Aug-20 Nov-20 District (S & I) 5 HVDS-9 HVDS in Howrah 11.87 NCB Prior review Aug-20 Nov-20 District (S & I) HVDS-10 HVDS in Purba 11.87 NCB Prior review Aug-20 Nov-20 Midnapur District (S & I) 6 HVDS-11 HVDS in Bankura 11.87 NCB Prior review Aug-20 Dec-20 District (S & I) HVDS-12 HVDS in Purulia 11.87 NCB Prior review Aug-20 Dec-20 District (S & I) 7 HVDS-13 HVDS in 11.87 NCB Prior review Aug-20 Dec-20 Murshidabad (S & District I) PROCUREMENT India : West Bengal Electricity Distribution Grid Modernization Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2020-06-22 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170590 GPN Date: 2020-03-03 Project Name: West Bengal Electricity Distribution Grid Modernization Project Loan / Credit No: / W Executing Agency(ies): est Bengal State Electricity Distribution Company Limited WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-WBSEDCL-183966-CW- RFB / Implementation of High Under Distribution System Single Stage - Two 6,316,742.9 2022-12- Voltage Distribution System / Prior Request for Bids Open - National Implementat 2020-07-20 2020-07-27 2020-08-05 2020-08-07 2020-09-04 2020-09-22 2020-11-10 2020-12-14 2020-12-23 Strengthening Envelope 6 22 (HVDS) in Howrah district of ion West Bengal IN-WBSEDCL-183989-CW- RFB / Implementation of High Under Distribution System Single Stage - Two 6,856,037.0 2022-12- Voltage Distribution System / Prior Request for Bids Open - National Implementat 2020-07-20 2020-07-27 2020-08-05 2020-08-07 2020-09-04 2020-09-22 2020-11-10 2020-12-13 2020-12-23 Strengthening Envelope 1 22 (HVDS) in Purba Midnapur ion district of West Bengal IN-WBSEDCL-187644-CW- RFB / Conversion of overhead Under Distribution System Single Stage - Two 2023-01- network to underground / Prior Request for Bids Open - National 0.00 Implementat 2020-08-14 2020-08-24 2020-08-25 2020-08-26 2020-09-29 2020-09-29 2020-11-10 2020-12-29 2021-01-31 Strengthening Envelope 30 cabling system for Baruipur ion Town IN-WBSEDCL-189633-CW- RFB / Implementation of High Under Voltage Distribution System Distribution System Single Stage - Two 11,345,475. 2023-01- / Prior Request for Bids Open - National Implementat 2020-08-25 2020-08-31 2020-09-04 2020-09-04 2020-10-09 2020-11-03 2020-12-04 2021-02-12 2021-01-31 (HVDS) in Alipurduar and Strengthening Envelope 85 30 ion Coochbehar districts of West Bengal IN-WBSEDCL-189638-CW- RFB / Implementation of High Under Voltage Distribution System Distribution System Single Stage - Two 18,959,985. 2023-01- / Prior Request for Bids Open - National Implementat 2020-08-25 2020-09-01 2020-09-04 2020-09-04 2020-10-09 2020-11-03 2020-12-04 2021-02-10 2021-01-31 (HVDS) in Uttar Dinajpur, Strengthening Envelope 75 30 ion Dakshin Dinajpur and Malda districts of West Bengal IN-WBSEDCL-189639-CW- RFB / Implementation of High Under Distribution System Single Stage - Two 11,274,497. 2023-01- Voltage Distribution System / Prior Request for Bids Open - National Implementat 2020-08-25 2020-08-31 2020-09-04 2020-09-04 2020-10-09 2020-11-03 2020-12-04 2021-02-02 2021-01-31 Strengthening Envelope 14 30 (HVDS) in Bankura and Purulia ion districts of West Bengal IN-WBSEDCL-189972-CW- RFB / Supply and Installations of 02 nos. New 33/11 KV Sub- Under Distribution System Single Stage - Two 2022-07- Stations and associated 33 KV / Post Request for Bids Open - National 0.00 Implementat 2020-08-25 2020-08-26 2020-08-26 2020-08-26 2020-09-29 2020-09-29 2020-11-10 2020-12-03 2021-01-31 Strengthening Envelope 30 & 11 KV lines in Alipurduar ion Region of WBSEDCL in West Bengal. IN-WBSEDCL-211042-CW- RFB / Conversion of Overhead Network into Underground Under Distribution System Single Stage - Two 2023-04- cable system at Rajarhat Town / Prior Request for Bids Open - National 0.00 Implementat 2020-12-24 2021-01-11 2021-01-05 2021-01-13 2021-02-08 2021-03-25 2021-03-03 2021-06-06 2021-04-30 Strengthening Envelope 29 under North 24 Parganas ion district within the state of West Bengal IN-WBSEDCL-211050-CW- RFB / Conversion of Overhead Network into Underground Under Distribution System Single Stage - Two 2023-04- cable system at Baguiati and / Prior Request for Bids Open - National 0.00 Implementat 2020-12-24 2021-01-11 2021-01-05 2021-01-13 2021-02-08 2021-02-08 2021-03-03 2021-06-08 2021-04-30 Strengthening Envelope 29 Keshtopur Towns under North ion 24 Parganas district within the state of West Bengal IN-WBSEDCL-211428-CW- RFB / Implementation of High Under Voltage Distribution System Distribution System Single Stage - Two 2023-05- / Prior Request for Bids Open - National 0.00 Implementat 2020-12-30 2021-01-04 2021-01-05 2021-01-05 2021-02-05 2021-02-10 2021-03-09 2021-05-24 2021-05-06 (HVDS) in Nadia and Strengthening Envelope 05 ion Murshidabad districts of West Bengal (2 packages) IN-WBSEDCL-234470-CW- RFB / Supply and Installation of High Voltage Distribution Other (with Under Distribution System Single Stage - Two 2023-09- System (HVDS) in semi-urban / Prior Request for Bids Open - National field for 0.00 Implementat 2021-05-18 2021-05-20 2021-06-10 2021-07-14 2021-08-31 2021-10-28 Strengthening Envelope 29 and rural areas in Jalpaiguri & explanation) ion Darjeeling (Plain area) Districts in West Bengal IN-WBSEDCL-233597-CW- RFB / Conversion of Overhead Network into Underground cable system at KhargapurTown under North Other (with Under Distribution System Single Stage - Two 2023-09- 24 Parganas Paschim / Prior Request for Bids Open - National field for 0.00 Implementat 2021-05-13 2021-05-26 2021-05-21 2021-06-04 2021-06-24 2021-09-06 2021-10-26 Strengthening Envelope 20 Midnapore district within the explanation) ion state of West Bengal' under West Bengal Electricity Distribution Grid Modernisation Project Page 1 IN-WBSEDCL-233611-CW- RFB / Conversion of Overhead Network into Underground cable system at Asansol Town(Part 1) under Paschim Other (with Under Distribution System Single Stage - Two 2023-09- Burdwan district within the / Prior Request for Bids Open - National field for 0.00 Implementat 2021-05-13 2021-05-23 2021-05-21 2021-06-01 2021-06-24 2021-09-06 2021-10-26 Strengthening Envelope 20 state of West Bengal' under explanation) ion West Bengal Electricity Distribution Grid Modernisation Project (P-170590) IN-WBSEDCL-233612-CW- RFB / Conversion of Overhead Network into Underground cable system at Asansol Town(Part 2) under Paschim Other (with Under Distribution System Single Stage - Two 2023-09- Burdwan district within the / Prior Request for Bids Open - National field for 0.00 Implementat 2021-05-13 2021-05-23 2021-05-21 2021-06-01 2021-06-24 2021-09-06 2021-10-26 Strengthening Envelope 20 state of West Bengal' under explanation) ion West Bengal Electricity Distribution Grid Modernisation Project (P-170590) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-WBSEDCL-213824-CS- CQS / Invitation of EOI & RFP under International Procurement for Engagement Distribution System Quality And Cost- of PMA i.r.o HVDS projects for / Prior Open - International 0.00 Canceled 2021-01-25 2021-02-04 2021-02-02 2021-02-09 2021-03-18 2021-04-17 2021-05-17 2021-06-21 2021-07-26 2023-07-25 Strengthening Based Selection West Bengal Electricity Distribution Grid Modernization Project under World Bank loan financing IN-WBSEDCL-217209-CS- QCBS / Invitation of EOI & RFP under International Procurement for Engagement of PMA for conversion of OH Distribution System Quality And Cost- network into UG cable system / Prior Open - International 0.00 Under Review 2021-02-03 2021-02-03 2021-02-09 2021-02-05 2021-04-16 2021-05-07 2021-05-27 2021-07-05 2021-08-12 2023-08-11 Strengthening Based Selection at 5 towns(6 Pkgs) for West Bengal Electricity Distribution Grid Modernisation Project under World Bank loan financing IN-WBSEDCL-229919-CS- QCBS / Invitation of EOI & RFP under International Procurement for Engagement Distribution System Quality And Cost- Under of PMA i.r.o HVDS projects for / Prior Open - International 0.00 2021-04-19 2021-05-06 2021-04-21 2021-05-06 2021-05-07 2021-06-02 2021-06-16 2021-07-05 2021-08-12 2023-08-11 Strengthening Based Selection Implementation West Bengal Electricity Distribution Grid Modernization Project under World Bank loan financing IN-WBSEDCL-239229-CS- QCBS / Direct RFP - Consultancy Services for Smart Grid Development in Quality And Cost- Pending / Post Open - National 0.00 2021-06-30 2021-06-30 2021-07-07 2021-08-04 2021-09-03 2021-10-08 2021-11-17 2023-11-17 Project Management of Urban Areas Based Selection Implementation deployment of SCADA/DMS/OMS in WBSEDCL INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-WBSEDCL-171642-CS- CDS / Hiring a consultant for preparation of ESMF and ESIA documents for Distribution System Under / Post Direct Selection Direct 0.00 2020-07-01 2019-06-12 2020-07-15 2019-07-13 2020-08-19 2021-02-15 implementation of HVDS & Strengthening Implementation construction of GIS in 13 districts and UG cabling in 6 Towns of West Bengal IN-WBSEDCL-171990-CS- CDS / Hiring a consultant for preparation of DPR and PPSD for implementation of HVDS & Distribution System Under / Post Direct Selection Direct 0.00 2020-07-01 2019-06-12 2020-07-15 2019-07-29 2020-08-19 2021-02-15 construction of GIS in 13(+1) Strengthening Implementation districts and UG cabling in 6 Towns in WBSEDCL area of West Bengal Page 2 IN-WBSEDCL-181570-CS- CDS / Preparation of DPR for implementation of AMI project Smart Grid Development in Under / Post Direct Selection Direct 0.00 2020-07-01 2020-07-08 2020-07-11 2020-07-16 2020-09-14 2021-03-13 at different towns of West Urban Areas Implementation Bengal under World Bank assistance IN-WBSEDCL-181585-CS- CDS / Preparation of DPR for implementation of SCADA/ Smart Grid Development in Under / Post Direct Selection Direct 0.00 2020-07-01 2020-07-10 2020-07-11 2020-07-17 2020-09-14 2021-03-13 DMS project at different towns Urban Areas Implementation of West Bengal under World Bank assistance Page 3 PROCUREMENT PLAN (Textual Part) Project information: Uzbekistan Ferghana Valley Water Resources Management - Phase II (P149610) Project Implementation agency: Agency for Implementation of Projects in Water Sector under Ministry of Water Date of the Procurement Plan: October 2020 Period covered by this Procurement Plan: October 2020 – 31 August 2024 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Law dated January 25, 2018 , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: a) Open advertising of the procurement opportunity at the national level - this requirement is met - PPL January 25, 2018: Articles 8; 24; 47; 49; 52; 61. (b) The procurement is open to eligible firms from any country - the requirement is met - PPL January 25, 2018: Articles 17; 28; 29; 34. (c) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights – the requirement is met conditionally - The Bank’s Anti-Corruption Guidelines and Sanctions Framework shall be incorporated into the national bidding documents by adding a page entitled “Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework”. This condition shall be reflected under the list of applicable conditions for National Procurement Arrangements in the textual part of the procurement plan of the project to be financed by the World Bank in Uzbekistan. (d) Contracts with an appropriate allocation of responsibilities, risks, and liabilities - the requirement is met conditionally - This condition shall be reflected under the list of applicable conditions for National Procurement Arrangements in the textual part of the procurement plan of the project to be financed by the WB. (e) Publication of contract award information - the requirement is met - PPL January 25, 2018: Articles 32; 55; 64. (f) Rights for the Bank to review procurement documentation and activities - the requirement is met - PPL January 25, 2018: (g) An effective complaints mechanism - the requirement is met - PPL January 25, 2018: (h) Maintenance of records of the Procurement Process - the requirement is met - PPL January 25, 2018. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. PROCUREMENT Uzbekistan : Ferghana Valley Water Resources Management - Phase II PLAN General Information Country: Uzbekistan Bank’s Approval Date of the Original Procurement Plan: 2017-08-28 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149610 GPN Date: Project Name: Ferghana Valley Water Resources Management - Phase II Loan / Credit No: IDA / 60830, TF / A9862 Ministry of Water Resources Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FVWRMP/ICB/01 LOT-1 / Lot 1 "Rehabilitation of main and inter-farm Irrigation canals with structures": • Rehabilitation of main and Component A: Irrigation Single Stage - One 2021-11- inter-farm Irrigation canals IDA / 60830 Prior Request for Bids Open - International 0.00 Canceled 2018-08-10 2018-08-10 2018-08-10 2018-10-05 2018-11-04 2018-11-24 Modernization Envelope 23 with structures - 61.879 km • Volume of Earthworks - 135.5 thousand m3 • Concrete works - 32.9 thousand m3 • Vol FVWRMP/ICB/01 LOT-2 / Lot 2 "Construction of new irrigation wells": • Total number of wells - Component A: Irrigation Single Stage - One 2021-12- 105 (with a drilling diameter IDA / 60830 Prior Request for Bids Open - International 0.00 Canceled 2018-08-10 2018-08-10 2018-08-10 2018-10-05 2018-11-04 2018-12-09 Modernization Envelope 08 of 119 to 400 mm.) • Yield of wells - from 15 to 25 liter/sec. • Depth of wells - from 80 to 170 meters. FVWRMP/ICB/01 LOT-3 / Lot 3 Rehabilitation of Pump Stations": • Rehabilitation of 9 Pump Stations (including Component A: Irrigation Single Stage - One 2021-12- IDA / 60830 Prior Request for Bids Open - International 0.00 Canceled 2018-08-10 2018-08-10 2018-10-05 2018-11-04 2018-12-09 Reconstruction of Pump Modernization Envelope 08 Station Buildings) • Total number of Pump Units - 29 • Capacity of Pump Unit - from 0,25 m3/sec. to 6,3 m3/sec. FVWRMP/ICB/01 / FVWRMP/ICB/01 (Rehabilitation of Padshaota Irrigation Infrastructure in Namangan Region) Component A: Irrigation Single Stage - One 2019-06- IDA / 60830 Prior Request for Bids Open - International 0.00 Canceled 2018-08-17 2018-08-17 2018-08-22 2018-08-17 2018-10-03 2018-11-02 2018-12-07 Consists of the following lots: Modernization Envelope 05 Lot 1 - "Rehabilitation of main and inter-farm Irrigation canals with structures": • Rehabilitation of main and inter-farm Irrigation FVWRMP/ICB/1 / FVWRMP/ICB/01 (Rehabilitation of Padshaota Infrastructure in Namangan Region) Consists of the Component A: Irrigation Single Stage - One 2020-01- following Lots: Lot #1 IDA / 60830 Prior Request for Bids Open - International 0.00 Canceled 2019-04-03 2019-04-08 2019-05-20 2019-06-19 2019-05-21 2019-07-24 Modernization Envelope 20 (Rehabilitation of Canals), Lot #2 (Construction of New Wells) and Lot #3 (Rehabilitation of Pumping Stations) UZ-PIU-119524-CW-RFB / FVWRMP/ICB/01 (Rehabilitation of Padshaota Component A: Irrigation Single Stage - One 15,639,811. 2020-04- IDA / 60830 Prior Request for Bids Open - International Signed 2019-06-18 2019-06-27 2019-06-23 2019-08-04 2018-10-05 2019-09-03 2019-07-16 2019-10-08 2019-04-23 Irrigation Infrastructure in Modernization Envelope 02 05 Namangan Region) Consists of 3 lots. FVWRMP-II/ICB/3-1 / FVWRMP-II/ICB/3-1 Rehabilitation and Component A: Irrigation Single Stage - One 8,346,757.0 Under 2020-05- IDA / 60830 Prior Request for Bids Open - International 2019-07-15 2019-07-19 2019-07-20 2019-07-19 2019-08-31 2019-09-04 2019-09-30 2019-12-11 2019-11-04 2019-12-26 Reconstruction of Existing Modernization Envelope 1 Review 02 Canals and Structures in Andijan Region FVWRMP-II/ICB/2-1 / FVWRMP-II/ICB/2-1 consists of the following lots: Lot-1 “Construction of Component A: Irrigation Single Stage - One 16,535,376. 2020-05- irrigation wells in Ferghana IDA / 60830 Prior Request for Bids Open - International Signed 2019-07-15 2019-07-19 2019-07-20 2019-07-19 2019-08-31 2019-09-04 2019-09-30 2019-12-12 2019-11-04 2019-12-25 Modernization Envelope 84 02 and Kuvasoy districts” Lot-2 “Rehabilitation and reconstruction of existing canals and structures” FVWRMP/ICB/1 LOT-3 / FVWRMP/ICB/01 Lot-3 Component A: Irrigation Single Stage - One 12,059,963. 2020-05- Rehabilitation of Pump IDA / 60830 Prior Request for Bids Open - International Signed 2019-07-15 2019-07-26 2019-07-20 2019-07-26 2019-08-31 2019-09-04 2019-09-30 2019-12-11 2019-11-04 2019-12-30 Modernization Envelope 94 02 Stations in Padshaota Irrigation Infrastructure Page 1 FVWRMP-II/ICB/2-2 / FWRMP- II/ICB/2-2 Rehabilitation of Isfayram-Shahimardon Irrigation Infrastructure: Construction of new Avval- Component A: Irrigation Single Stage - One 2023-08- IDA / 60830 Prior Request for Bids Open - International 0.00 Canceled 2020-04-03 2020-04-15 2020-04-08 2020-04-21 2020-06-07 2020-07-03 2020-07-07 2021-04-09 2020-08-11 Lagon Pump station and Modernization Envelope 11 Rehabilitation and Modernization of Existing Isfayram-Shahimardan Pump Station in Fergana Region FVWRMP-II/ICB/3-2 / FWRMP- II/ICB/3-2 Rehabilitation of Savay-Akburasoy Irrigation Component A: Irrigation Single Stage - One 2023-07- Infrastructure: Rehabilitation IDA / 60830 Prior Request for Bids Open - International 0.00 Canceled 2020-04-03 2020-04-15 2020-04-08 2020-04-21 2020-05-20 2020-07-03 2020-06-19 2021-04-09 2020-07-24 Modernization Envelope 24 and Modernization of Existing Orom and Savay Pump Stations in Andijan Region FVWRMP-II/ICB/2-2/2 / Rehabilitation of Shahimardon Irrigation Infrastructure: Request for Construction of new Avval- Bids - Works Component A: Irrigation Single Stage - One Under 2022-04- Lagon and Rehabilitation and IDA / 60830 Prior Request for Bids Open - International (without 0.00 2021-05-21 2021-05-26 2021-08-04 2021-09-03 2021-10-08 Modernization Envelope Review 06 Modernization of Existing prequalificati Isfayram-Shahimardon Pump on) SPD Stations in Fergana Region (re- bidding) FVWRMP-II/ICB/3-2/2 / Rehabilitation of Savay- Request for Akburasoy Irrigation Bids - Works Infrastructure: Rehabilitation Component A: Irrigation Single Stage - One Under 2022-04- IDA / 60830 Prior Request for Bids Open - International (without 0.00 2021-05-21 2021-05-26 2021-08-04 2021-09-03 2021-10-08 and Modernization of Existing Modernization Envelope Review 06 prequalificati Orom and Savay-1 Pump on) SPD Stations in Andijan Region (re- bidding) Request for FVWRMP/EUG/W01 / Quotations - Improving working condition Pending Component C: Project Request for Single Stage - One Small Works 2021-02- by ensuring the renovation of TF / A9862 Post Open - National 0.00 Implementat 2020-11-15 2020-12-26 Management Quotations Envelope (Emergency) 10 the PIU office (demolishing of ion SPD - the existing structures) Competitive Request for FVWRMP/EUG/W02 / Quotations - Improving working condition Pending Component C: Project Request for Single Stage - One Small Works 2022-03- by ensuring the renovation of TF / A9862 Post Open - National 0.00 Implementat 2021-12-03 2022-01-17 Management Quotations Envelope (Emergency) 23 the PIU office (reconstraction ion SPD - of second floor) Competitive Request for FVWRMP/EUG/W03 / Quotations - Improving working conditions Pending Component C: Project Request for Single Stage - One Small Works 2022-04- by ensuring the renovation of TF / A9862 Post Open - National 0.00 Implementat 2022-01-04 2022-02-04 Management Quotations Envelope (Emergency) 05 the PIU office (reconstruction ion SPD - of third floor) Competitive GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FVWRMP/EUG/GEQ/1 / IT Component C: Project Request for Single Stage - One TF / A9862 Post Open - National 0.00 Canceled 2020-10-25 2020-12-17 2021-01-13 equipment for PIU Management Quotations Envelope FVWRMP/EUG/GEQ/2 / Component C: Project Request for Single Stage - One TF / A9862 Post Open - National 0.00 Canceled 2020-11-15 2020-12-25 2021-01-05 Vehicles for PIU Management Quotations Envelope NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FVWRMP/CON/1 / The main tasks of the Consultant are: Preparation of the detailed design for construction works and tender documents, as well Component C: Project Quality And Cost- IDA / 60830 Prior Open - International 4,120,410.00 Signed 2017-08-20 2017-09-10 2017-08-29 2017-10-24 2017-11-21 2018-08-30 2017-12-21 2018-11-22 2018-01-25 2018-12-19 2018-03-01 2018-12-20 2019-03-01 as bids evaluation and Management Based Selection preparation of Evaluation Reports, coordination of the reports with authorized agencies of the Republic. FVWRMP/CON/6 / The objective is to express a professional opinion on the project's financial position as Component C: Project Least Cost at the end of December 31, IDA / 60830 Post Open - International 32,640.00 Signed 2018-10-29 2018-11-13 2018-11-13 2018-11-22 2018-12-27 2019-01-09 2019-01-24 2020-02-13 2019-02-23 2019-03-12 2019-03-30 2019-05-19 2019-05-04 2019-05-22 2019-10-31 Management Selection 2018, 2019 and 2020, and of the income and expenditure for the accounting period ending on these dates. FVWRMP/CON/2 / The objective of the services is to monitor and provide feedback on the success in meeting the Component C: Project Quality And Cost- project objectives, and assess IDA / 60830 Prior Open - International 0.00 Canceled 2019-01-10 2019-04-02 2019-01-31 2019-04-18 2019-03-16 2019-04-13 2019-05-13 2019-06-17 2019-07-22 2024-12-31 Management Based Selection its physical, social, and economic impact, the EAMP, the resettlement policy framework requirements. Page 2 FVWRMP/CON/02 / The objective of the services is to monitor and provide feedback on the success in meeting the Component C: Project Quality And Cost- project objectives, and assess IDA / 60830 Prior Open - International 1,028,280.00 Signed 2019-10-08 2019-10-17 2019-10-29 2019-10-17 2019-12-12 2020-02-06 2020-01-09 2020-05-01 2020-02-08 2020-09-15 2020-03-14 2020-11-02 2020-04-18 2020-11-03 2021-04-18 Management Based Selection its physical, social, and economic impact, the EAMP, the resettlement policy framework requirements. FVWRMP/EUG/CON8 / Audit Component C: Project Least Cost TF / A9862 Post Open - National 0.00 Canceled 2020-11-10 2020-12-01 2021-01-14 2021-02-11 2021-03-13 2021-04-17 2021-05-22 2025-03-04 2020-2024 Management Selection FVWRMP/EUG/CON/1 / Consulting services for provision of services such as: a) preparation of bid documentation for Component B: Support for Quality And Cost- Under demonstration plots and/or TF / A9862 Prior Open - International 0.00 2021-03-19 2021-05-05 2021-04-09 2021-05-20 2021-05-19 2021-06-02 2021-06-09 2021-06-30 2021-07-12 2024-08-31 Agricultural Modernization Based Selection Implementation farmers’ field school and supervision of implementation b) development of the training curriculum and materials, c) conduct trainings FVWRMP/EUG/W04 / Preparation of design, cost Consultant estimate for improving Component C: Project Pending TF / A9862 Post Qualification Open - National 0.00 2020-10-25 2020-11-08 2020-11-29 2020-12-29 2021-01-08 2021-02-21 working conditions by Management Implementation Selection ensuring the renovation of the PIU office. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual FVWRMP/EUG/CON5 / ITC Component C: Project TF / A9862 Post Consultant Open 0.00 Canceled 2020-11-30 2021-02-03 2021-02-24 2021-03-26 2023-03-24 Consultancy services Management Selection Individual FVWRMP/EUG/CON6 / Legal Component C: Project TF / A9862 Post Consultant Open 0.00 Canceled 2020-11-10 2021-01-19 2021-02-09 2021-03-12 2023-03-24 Consultancy services Management Selection Individual FVWRMP/EUG/CON7 / Component C: Project TF / A9862 Post Consultant Open 0.00 Canceled 2020-11-20 2021-01-18 2021-02-08 2021-03-11 2023-03-24 Gender consultancy services Management Selection FVWRMP/EUG/CON1 / Consultancy for tender documentation, technical Individual needs and cost estimation, Component B: Support for TF / A9862 Prior Consultant Open 0.00 Canceled 2020-11-10 2021-01-19 2021-02-09 2021-03-10 2024-05-20 trainings needs assessment, Agricultural Modernization Selection ToR development and author supervision for intensification and diversification of the crop FVWRMP/EUG/CON3 / Consultancy for tender documentation, technical needs and cost estimation, Individual Component A: Irrigation training needs assessment, TF / A9862 Post Consultant Open 96,120.00 Signed 2021-03-09 2021-03-12 2021-04-19 2021-04-21 2021-04-29 2021-05-18 2021-05-09 2021-05-18 2022-05-09 Modernization ToR development and author Selection supervision for use Solar Energy for Irrigation and Drainage pumps FVWRMP/EUG/CON2 / Consultancy for tender documentation, technical needs and cost estimation, Individual Component B: Support for Under training needs assessment, TF / A9862 Post Consultant Open 0.00 2021-03-09 2021-03-12 2021-04-19 2021-06-09 2021-04-29 2021-05-09 2022-05-09 Agricultural Modernization Implementation ToR development and author Selection supervision for introduction of volumetric payment of O&M fees system FVWRMP/CON/4/IPC / Individual Component C: Project International Procurement IDA / 60830 Post Consultant Open 88,760.00 Signed 2021-05-15 2018-06-01 2021-06-08 2017-11-14 2021-06-13 2018-06-01 2021-06-21 2018-06-01 2021-12-18 Management Consultant Selection FVWRMP/EUG/CON4 / Water Individual Component C: Project Pending management development TF / A9862 Post Consultant Open 0.00 2021-10-24 2021-12-12 2022-01-02 2022-02-06 2024-08-31 Management Implementation consultant Selection Page 3 PROCUREMENT PLAN (Textual Part) Project information: Country: Serbia, North Macedonia, Albania Project Name: Western Balkans Trade and Transport Facilitation (P162043) Project Implementation agencies for each country: - Ministry of Construction, Transport and Infrastructure (Serbia) - Ministry of Transport and Communication (North Macedonia) - Ministry of Finance and Economy (Albania) Date of the Procurement Plan: Aug 6, 2020 Period covered by this Procurement Plan: Dec 2019 to Dec 2025 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. Procurement methods and prior review thresholds: Serbia: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Goods, works, and non-consulting services International (ICB) > Works, Turnkey/S&I of Plant $5,000,000 1. All Works/Turnkey/S&I of plant and equipment National (NCB) < above US$5.0 million per contract $5,000,000 International (ICB) Goods/IT/non consulting services Goods, IT and non- >$1,000,000 2. above US$1.5 million per contract consulting services National (NCB) V $1,000,000 Request for quotations 3. < $100,000 - (goods) Request for quotations 4. <$200,000 - (works) Selection Method Prior Review Threshold Consulting services Quality Cost Based Selection 1. >$300,000 (QCBS) 2. Least Cost Selection (LCS) >$300,000 Consulting services firms above Single Source Selection US$0.5 million per contract 3. - (SSS) (Firms and individuals) Consultant Qualifications 4. CQ < $300,000 (CQ) Individuals above US$0.2 million 5. Individual Consultant (IC) per contract North Macedonia: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Goods, works, and non-consulting services International (ICB) > Works, Turnkey/S&I of Plant $5,000,000 1. All Works/Turnkey/S&I of plant and equipment National (NCB) < above US$10 million per contract $5,000,000 International (ICB) Goods/IT/non consulting services Goods, IT and non- >$1,000,000 2. above US$2 million per contract consulting services National (NCB) V $1,000,000 Request for quotations 3. < $100,000 - (goods) Request for quotations 4. <$200,000 - (works) Selection Method Prior Review Threshold Consulting services Quality Cost Based Selection 1. >$300,000 (QCBS) 2. Least Cost Selection (LCS) >$300,000 Consulting services firms above Single Source Selection US$1 million per contract 3. - (SSS) (Firms and individuals) Consultant Qualifications 4. CQ < $300,000 (CQ) Individuals above US$0.3 million 5. Individual Consultant (IC) per contract Albania: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Goods, works, and non-consulting services International (ICB) > Works, Turnkey/S&I of Plant $5,000,000 1. All Works/Turnkey/S&I of plant and equipment National (NCB) < above US$10 million per contract $5,000,000 International (ICB) Goods/IT/non consulting services Goods, IT and non- >$1,000,000 2. above US$2 million per contract consulting services National (NCB) V $1,000,000 Request for quotations 3. < $100,000 - (goods) Request for quotations 4. <$200,000 - (works) Selection Method Prior Review Threshold Consulting services Quality Cost Based Selection 1. >$300,000 (QCBS) 2. Least Cost Selection (LCS) >$300,000 Consulting services firms above Single Source Selection US$1 million per contract 3. - (SSS) (Firms and individuals) Consultant Qualifications 4. CQ < $300,000 (CQ) Individuals above US$0.3 million 5. Individual Consultant (IC) per contract PROCUREMENT Western Balkans : Western Balkans Trade and Transport Facilitation PLAN General Information Country: Western Balkans Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162043 GPN Date: 2020-05-06 Project Name: Western Balkans Trade and Transport Facilitation Loan / Credit No: IBRD / 89330 C Executing Agency(ies): entral Financing and Contracting Unit WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Bids - WBTTF-ALB-131C / Physical Facilitating movement of Pending Single Stage - One Small Works SPD 2023-03- works at BCP Qafe Thana IBRD / 89330 goods across the Western Post Request for Bids Open - International 2,000,000.00 0.00 Implementat 2022-04-30 2022-05-21 2022-07-02 2022-08-19 2022-09-23 Envelope (1 envelope 22 according to design Balkans ion process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WBTTF-ALB-112D / NSW Facilitating movement of Pending Single Stage - One hardware infrastructure IBRD / 89330 goods across the Western Prior Request for Bids Open - International 3,600,000.00 0.00 Implementati 2021-12-01 2021-12-06 2022-01-17 2022-03-06 2022-04-10 2022-12-06 Envelope provision Balkans on Suporting Project WBTTF-ALB-412A / IT Request for Single Stage - One IBRD / 89330 Implementation and Post Open - National 40,000.00 0.00 Canceled 2020-02-16 2020-04-12 2020-10-09 Equipment for PIU staff Quotations Envelope Coordination WBTTF-ALB-412B / Furniture Suporting Project Request for Single Stage - One and consumables for PIU staff IBRD / 89330 Implementation and Post Open - National 20,000.00 0.00 Canceled 2020-05-19 2020-05-14 2020-07-14 2021-01-10 Quotations Envelope offices Coordination Suporting Project WBTTF-ALB-412 A / IT Request for Single Stage - One IBRD / 89330 Implementation and Post Open - National 40,000.00 0.00 Canceled 2020-05-20 2020-05-14 2020-07-15 2021-01-11 Equipment for PIU staff Quotations Envelope Coordination Suporting Project Pending WBTTF-ALB-412A (RE-BID) / Request for Single Stage - One IBRD / 89330 Implementation and Post Open - National 40,000.00 0.00 Implementati 2020-08-23 2020-10-18 2021-04-16 IT equipment for PIU staff Quotations Envelope Coordination on WBTTF-ALB-412B (RE-BID) / Suporting Project Pending Request for Single Stage - One Furniture and consumables IBRD / 89330 Implementation and Post Open - National 20,000.00 0.00 Implementati 2020-08-24 2020-10-19 2021-04-17 Quotations Envelope for PIU staff offices Coordination on WBTTF-ALB-112C / NSW Facilitating movement of Pending Single Stage - One software development and IBRD / 89330 goods across the Western Post Request for Bids Open - International 1,300,000.00 0.00 Implementati 2021-11-14 2021-11-19 2021-12-31 2022-02-17 2022-03-24 2024-03-13 Envelope provision Balkans on WBTTF-ALB-121B / Architecture and deployment of the National Transit Facilitating movement of Pending Single Stage - One Application and Economic IBRD / 89330 goods across the Western Prior Request for Bids Open - International 2,200,000.00 0.00 Implementati 2021-08-04 2021-08-09 2021-09-20 2021-11-07 2021-12-12 2024-02-01 Envelope Operator Registration and Balkans on Identification (EORI) fully compatible with EU-NCTS WBTTF-ALB-121C / IT deployment of modules for NCTS implementation, Facilitating movement of Pending including the national IT Single Stage - One IBRD / 89330 goods across the Western Post Request for Bids Open - International 600,000.00 0.00 Implementati 2021-08-20 2021-08-30 2021-10-11 2021-11-28 2022-01-02 2023-12-23 system establishing Envelope Balkans on connectivity to the EU common domain through “CCN/CSI” / “SPEED2” WBTTF-ALB-131D / Provision Facilitating movement of Pending of equipment to expedite Single Stage - One IBRD / 89330 goods across the Western Post Request for Bids Open - National 700,000.00 0.00 Implementati 2022-10-20 2022-10-25 2022-12-06 2023-01-05 2023-02-09 2024-02-04 inspection and speed up the Envelope Balkans on flow of goods Pending WBTTF-ALB-212A / Provision Enhancing transport Single Stage - One IBRD / 89330 Prior Request for Bids Open - International 5,400,000.00 0.00 Implementati 2021-11-04 2021-11-14 2021-12-26 2022-02-12 2022-03-31 2022-09-27 of the VTMIS systems in 4 lots efficiency and predictability Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WBTTF-ALB-111B / Legal gap analysis, Review of current systems and Development of Blueprint: Legal AP, Business Facilitating movement of Process Model, Functional & Quality And Cost- IBRD / 89330 goods across the Western Post Open - International 300,000.00 0.00 Canceled 2020-03-31 2020-04-21 2020-06-04 2020-07-02 2020-08-01 2020-09-05 2020-10-10 2021-09-09 Technical Architecture, Based Selection Balkans Operational & Governance Model, Capacity Building Plan, Fee Model, Risk Mgmt, Change Mgmt, Implementation Pl Page 1 WBTTF-ALB-121A / Situation analysis and Review of international best practice in implementing a new NCTS, Facilitating movement of Consultant including the lessons learned IBRD / 89330 goods across the Western Post Qualification Open - International 100,000.00 83,130.00 Signed 2020-06-06 2020-06-10 2020-06-27 2020-08-10 2020-09-22 2020-09-09 2020-11-11 2020-10-14 2020-12-04 2021-04-12 from the FYR Macedonia and Balkans Selection Serbia experiences, as well as twinning project under IPA 2012 "Modernization of the Albanian Customs Adm." WBTTF-ALB-112B / Implementation of a Facilitating movement of Consultant Pending harmonized data model IBRD / 89330 goods across the Western Post Qualification Open - International 200,000.00 0.00 2021-10-15 2021-11-05 2021-12-19 2022-01-18 2022-02-22 2024-02-24 Implementation across all stakeholders Balkans Selection according to the Business Process Model WBTTF-ALB-112F / Constitution of an operational Facilitating movement of Consultant Pending Ownership, Oversight, IBRD / 89330 goods across the Western Post Qualification Open - International 200,000.00 0.00 2022-03-03 2022-03-24 2022-05-07 2022-06-06 2022-07-11 2024-01-07 Implementation Management and Reporting Balkans Selection structure WBTTF-ALB-131B / Design and supervision of the Facilitating movement of Consultant Pending infrastructure and equipment IBRD / 89330 goods across the Western Post Qualification Open - National 110,000.00 0.00 2021-10-15 2021-11-05 2021-12-19 2022-01-18 2022-02-22 2023-02-17 Implementation upgrade in coordination with Balkans Selection North Macedonia counterparts WBTTF-ALB-132A / Review of current practices and plan to promote the integration of Facilitating movement of Consultant Pending information flows among IBRD / 89330 goods across the Western Post Qualification Open - International 50,000.00 0.00 2022-10-20 2022-11-10 2022-12-24 2023-01-23 2023-02-27 2023-08-26 Implementation border agencies and traders Balkans Selection and harmonization of their operational procedures WBTTF-ALB-132B / Facilitating movement of Consultant Implementation of the plan to Pending IBRD / 89330 goods across the Western Post Qualification Open - International 50,000.00 0.00 2021-11-14 2021-12-05 2022-01-18 2022-02-17 2022-03-24 2022-09-20 promote integration and Implementation Balkans Selection harmonization WBTTF-ALB-211B / Implementation plan, Detailed Design and Technical Specifications aligned with the Consultant Enhancing transport Pending recommendations from the FS IBRD / 89330 Post Qualification Open - International 120,000.00 0.00 2021-09-05 2021-09-26 2021-11-09 2021-12-09 2022-01-13 2022-07-12 efficiency and predictability Implementation and Supervision of the Selection Provision, Installation and Commissioning of ITS Equipment. WBTTF-ALB-112E / Facilitating movement of Consultant Implementation of the Pending IBRD / 89330 goods across the Western Post Qualification Open - International 200,000.00 0.00 2022-01-14 2022-02-04 2022-03-20 2022-04-19 2022-05-24 2022-11-20 Technical Platform for Implementation Balkans Selection operation of the NSW system INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WBTTF-ALB-111A / Technical Facilitating movement of Individual advisor to craft governance IBRD / 89330 goods across the Western Post Consultant Open 45,000.00 0.00 Canceled 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-09-13 overall NSW vision Balkans Selection Suporting Project Individual WBTTF-ALB-411A / Head of IBRD / 89330 Implementation and Post Consultant Open 68,200.00 47,756.59 Signed 2019-11-13 2019-11-12 2019-12-12 2019-12-20 2019-12-15 2019-12-30 2020-01-15 2020-01-16 2022-08-02 PIU Coordination Selection Suporting Project Individual WBTTF-ALB-411B / IBRD / 89330 Implementation and Post Consultant Open 45,000.00 39,101.51 Signed 2019-11-13 2019-11-13 2019-12-12 2020-02-02 2019-12-15 2020-02-18 2020-01-15 2020-03-06 2022-07-03 Transport Engineer Coordination Selection WBTTF-ALB-411C / Trade Suporting Project Individual and Customs Expert - NSW / IBRD / 89330 Implementation and Post Consultant Open 45,000.00 41,485.38 Signed 2019-11-13 2019-11-13 2019-12-12 2019-12-30 2019-12-15 2019-12-31 2020-01-15 2020-01-16 2022-07-03 IT Coordination Selection WBTTF-ALB-411D / Suporting Project Individual Under Environment, social, and IBRD / 89330 Implementation and Post Consultant Open 18,000.00 0.00 2019-11-13 2021-06-03 2019-12-12 2019-12-15 2020-01-15 2021-01-09 Implementation citizen engagement specialist Coordination Selection WBTTF-ALB-411E / Suporting Project Individual Monitoring and Evaluation IBRD / 89330 Implementation and Post Consultant Open 22,500.00 0.00 Canceled 2019-11-13 2019-11-12 2019-12-12 2019-12-15 2020-01-15 2021-04-09 Expert Coordination Selection Suporting Project Individual WBTTF-ALB-411F / IBRD / 89330 Implementation and Post Consultant Open 18,000.00 21,637.28 Signed 2019-11-13 2019-11-13 2019-12-12 2019-12-31 2019-12-15 2019-12-31 2020-01-15 2020-01-16 2022-07-03 Administrative Assistant Coordination Selection WBTTF-ALB-411G / Suporting Project Individual Specialized Technical Advice Under IBRD / 89330 Implementation and Post Consultant Open 67,500.00 0.00 2020-06-01 2021-02-22 2020-07-20 2020-08-10 2020-09-14 2020-12-13 (any ad hoc specialized Implementation Coordination Selection consultant short term) WBTTF-ALB-131A / Review of Facilitating movement of Individual the existing physical condition Under IBRD / 89330 goods across the Western Post Consultant Open 67,500.00 0.00 2020-06-05 2020-08-25 2020-07-24 2021-03-02 2020-08-14 2021-04-13 2020-09-18 2021-03-17 and equipment and projected Implementation Balkans Selection needs WBTTF-ALB-212B / International expert to i) support the adoption of legal changes required to comply Individual with EU regulations, directives Enhancing transport IBRD / 89330 Post Consultant Open 30,000.00 0.00 Canceled 2020-06-21 2020-08-09 2020-08-30 2020-10-04 2022-01-12 and standards on ITS; and ii) efficiency and predictability Selection provide specific technical advice on VTMIS implementation and capacity building Page 2 WBTTF-ALB-411 E / Suporting Project Individual Under Monitoring and Evaluation IBRD / 89330 Implementation and Post Consultant Open 22,500.00 0.00 2020-12-01 2021-04-02 2020-12-30 2021-01-02 2021-02-02 2022-04-28 Implementation Expert Coordination Selection WBTTF-ALB-211A / Feasibility Study (FS) including the best EU practice in implementing a new VTMIS Individual and lessons learned from the Enhancing transport IBRD / 89330 Post Consultant Open 60,000.00 58,560.94 Signed 2020-05-27 2020-05-28 2020-07-15 2020-08-20 2020-08-05 2020-09-22 2020-09-09 2020-10-13 2020-12-08 neighbouring countries and i) efficiency and predictability Selection support the adoption of legal changes required to comply with EU regulations, directives and standards on ITS; WBTTF-ALB-112A / Technical adviser to support the Facilitating movement of Individual implementation of legal Pending IBRD / 89330 goods across the Western Post Consultant Open 22,500.00 0.00 2021-10-01 2021-11-19 2021-12-10 2022-01-14 2022-07-13 changes required to support Implementation Balkans Selection specific features of the new functional model Page 3 PROCUREMENT PLAN (Textual Part) Project information: Mozambique, Economic Linkages for Diversification (P171664) Project Implementation agency: Ministry of Economy and Finance Date of the Procurement Plan: December 8, 2020 Period covered by this Procurement Plan: December 15, 2020 – June 30, 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Decree 5/2016, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations –Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable PROCUREMENT Mozambique : Economic Linkages for Diversification PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2020-12-08 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171664 GPN Date: Project Name: Economic Linkages for Diversification Loan / Credit No: / , IDA / V3550 Ministry of Economy and Finance - DNT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-MEF-DNT-208405-GO- Pending Request for Single Stage - One RFQ / IT and Electronic / Project Management Post Limited 50,000.00 0.00 Implementati 2021-02-20 2021-04-17 2021-10-14 Quotations Envelope Equipment on Pending MZ-MEF-DNT-208408-GO- Request for Single Stage - One / Project Management Post Limited 25,000.00 0.00 Implementati 2021-03-05 2021-04-30 2021-10-27 RFQ / Office Furniture Quotations Envelope on Pending MZ-MEF-DNT-208407-GO- Single Stage - One / Project Management Post Request for Bids Open - National 120,000.00 0.00 Implementati 2021-02-15 2021-02-20 2021-04-03 2021-05-03 2021-06-07 2021-12-04 RFB / Vehicle purchase Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Developing economic MZ-MEF-DNT-232323-CS- linkages through skills, Quality And Cost- Pending QCBS / Master plan services IDA / V3550 Prior Open - International 600,000.00 0.00 2021-05-30 2021-06-20 2021-08-03 2021-08-31 2021-09-30 2021-11-04 2021-12-09 2022-12-09 finance, and quality Based Selection Implementation and Jamali for INATUR upgrading MZ-MEF-DNT-232326-CS- QCBS / Consulting services Developing economic for the design of materials, linkages through skills, Quality And Cost- Pending IDA / V3550 Post Open - National 250,000.00 0.00 2021-05-30 2021-06-20 2021-08-03 2021-08-31 2021-09-30 2021-11-04 2021-12-09 2022-12-09 image, communication tools, finance, and quality Based Selection Implementation and lead the awareness upgrading campaign efforts MZ-MEF-DNT-208398-CS- Enabling elements to support Quality And Cost- Under QCBS / Mapping of IDA / V3550 Prior Open - International 750,000.00 0.00 2021-06-06 2021-05-18 2021-06-27 2021-08-10 2021-09-07 2021-10-07 2021-11-11 2021-12-16 2022-12-16 economic linkages Based Selection Implementation manufacturing sector MZ-MEF-DNT-234783-CS- QCBS / APIEX - Technical Enabling elements to support Quality And Cost- Under IDA / V3550 Prior Open - National 150,000.00 0.00 2021-05-31 2021-05-24 2021-06-21 2021-06-18 2021-08-04 2021-09-01 2021-10-01 2021-11-05 2021-12-10 2022-12-10 assistance to team revising economic linkages Based Selection Implementation Investment Law INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual MZ-MEF-DNT-208325-CS- Under / Project Management Post Consultant Open 100,000.00 0.00 2020-12-22 2021-01-18 2021-02-09 2021-04-15 2021-03-02 2021-04-06 2021-10-03 INDV / Project Coordinator Implementation Selection MZ-MEF-DNT-208370-CS- Individual Under INDV / Financial Management / Project Management Post Consultant Open 70,000.00 0.00 2021-02-15 2021-01-18 2021-04-05 2021-04-15 2021-04-26 2021-05-31 2021-11-27 Implementation Specialist Selection MZ-MEF-DNT-208396-CS- INDV / Mapping of service providers in the targeted Individual Pending regions (including an / Project Management Post Consultant Open 50,000.00 0.00 2021-02-15 2021-04-05 2021-04-26 2021-05-31 2021-11-27 Implementation assessment of depth of CSOs Selection operating in the provinces of focus) Individual MZ-MEF-DNT-208376-CS- Under / Project Management Post Consultant Open 40,000.00 0.00 2021-01-28 2021-01-22 2021-03-18 2021-04-26 2021-04-08 2021-05-13 2021-11-09 INDV / Accountant Implementation Selection Individual MZ-MEF-DNT-208332-CS- Under / Project Management Prior Consultant Open 50,000.00 0.00 2021-01-25 2021-01-19 2021-03-15 2021-04-26 2021-04-05 2021-06-18 2021-05-10 2021-11-06 INDV / Procurement Specialist Implementation Selection MZ-MEF-DNT-208372-CS- Individual Under INDV / Environmental / Project Management Post Consultant Open 50,000.00 0.00 2021-01-25 2021-01-22 2021-03-15 2021-04-15 2021-04-05 2021-05-10 2021-11-06 Implementation Safeguards Specialist Selection Page 1 MZ-MEF-DNT-208381-CS- Individual INDV / Specialist to Support Under / Project Management Post Consultant Open 50,000.00 0.00 2021-02-10 2021-05-10 2021-03-31 2021-04-21 2021-05-26 2021-11-22 Firm Capabilities for Economic Implementation Selection Linkages MZ-MEF-DNT-208383-CS- Individual Pending INDV / Legal Adviser (Short- / Project Management Post Consultant Limited 20,000.00 0.00 2021-02-15 2021-02-20 2021-03-13 2021-04-17 2021-10-14 Implementation Term) Selection MZ-MEF-DNT-208399-CS- Individual Under INDV / Social Safeguards / Project Management Post Consultant Open 50,000.00 0.00 2021-02-15 2021-01-22 2021-04-05 2021-04-15 2021-04-26 2021-05-31 2021-11-27 Implementation Specialist Selection Individual MZ-MEF-DNT-208378-CS- Under / Project Management Post Consultant Open 40,000.00 0.00 2021-01-31 2021-05-10 2021-03-21 2021-04-11 2021-05-16 2021-11-12 INDV / M&E Specialist Implementation Selection MZ-MEF-DNT-232314-CS- Developing economic Individual INDV / Social and linkages through skills, Under IDA / V3550 Post Consultant Open 15,000.00 0.00 2021-05-20 2021-05-17 2021-07-08 2021-07-29 2021-09-02 2022-03-01 environmental specialist - finance, and quality Implementation Selection Nampula upgrading MZ-MEF-DNT-208395-CS- INDV / Capacity Assessment Individual of firms in specific sub- / Project Management Post Consultant Open 70,000.00 0.00 Canceled 2021-02-21 2021-04-11 2021-05-02 2021-06-06 2021-12-03 sectors and value chains for Selection potential to economic linkages MZ-MEF-DNT-208402-CS- Individual INDV / Project´s Operations / Project Management Post Consultant Open 35,000.00 0.00 Canceled 2021-02-15 2021-04-05 2021-04-26 2021-05-31 2021-11-27 Manual Selection MZ-MEF-DNT-232315-CS- Individual INDV / Social and Under IDA / V3550 Project Management Post Consultant Limited 15,000.00 0.00 2021-05-25 2021-05-17 2021-05-30 2021-06-20 2021-07-25 2022-01-21 environmental specialist Implementation Selection service in Cabo Delgado Individual MZ-MEF-DNT-233916-CS- Pending IDA / V3550 Project Management Post Consultant Limited 50,000.00 0.00 2021-05-30 2021-06-04 2021-06-25 2021-07-30 2022-01-26 INDV / Internal Auditor Implementation Selection MZ-MEF-DNT-232313-CS- Individual INDV / Social and Under IDA / V3550 Project Management Post Consultant Limited 15,000.00 0.00 2021-05-30 2021-05-20 2021-06-04 2021-06-25 2021-07-30 2022-01-26 environmental specialist - Implementation Selection Tete Page 2 Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: October 2016]: Revision 1 of Updated Procurement Plan, January 2017] 2. Date of General Procurement Notice: 15 July 2017 3. Period covered by this procurement plan: The procurement period of project covered from year January 2017 to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 780,000 All 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) Above US$ 476,000 First contract 5. Consultation of the suppliers Above US$ 20,000 First contract (Works) 6. (Non-Consultant Services) Above US$ 10,000 First contract 6. Individual consultants Above US$ 19,200 All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project under preparation. 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under Project preparation advance. PADAP August 22, 2017 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 Ref. Description Estimat Packages Dome Review Comme No. ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary of the ICB 0.00 0 No Prior (Works) Summary of the ICB 0.50 1 No Prior (Goods) Summary of the NCB 3.656 5 No Prior (Works) Summary of the NCB 0.78 1 No Prior (Goods) Summary of the ICB 0.00 0 No Prior (Non-Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) All 2. Single Source (Firms) All 3. Individual All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 PADAP August 22, 2017 Ref. Description of Assignment Estimated Package Review Comment No. Cost s by Bank s US$ (Prior / million Post) Summary of number of 0.00 0 Prior contracts that will be let under QCBS Summary of number of 0.00 0 Prior contracts that will be let under other methods PADAP August 22, 2017 PROCUREMENT Madagascar : Sustainable Landscape Management Project PLAN General Information Country: Madagascar Bank’s Approval Date of the Original Procurement Plan: 2017-11- 23 2021-05- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154698 GPN Date: 31 Project Name: Sustainable Landscape Management Project Loan / Credit No: IDA / V0430, IDA / 59790, COFN / C1540 PADAP PROJECT UNIT MANAGEMENT Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Signed Contract No. Approach Process n (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned T 05-18/CN / Travaux de rénovation des locaux de Component 3: Project l'UGP (Unité de Gestion du Single Stage - One 2018-11- 2018-10- 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-02- 2019-02- 2019-07- IDA / 59790 Management Coordination Post Request for Bids Open - National 50,000.00 69,010.77 Signed Projet) du PADAP à la Envelope 13 13 18 18 14 28 20 01 11 01 and M&E direction du Génie rural - MINAE à Nanisana Antananarivo. T 01-19/SAV / Travaux de réhabilitation de deux (02) bâtiments de la DRAEP : Component 3: Project Single Stage - One 2019-03- 2019-04- 2019-03- 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-08- Lot 01 : sis à Sambava, COFN / C1540 Management Coordination Post Request for Bids Open - National 65,000.00 55,651.97 Signed Envelope 15 11 26 25 13 05 17 09 28 18 Commune Sambava, and M&E District Sambava Lot 02 : à Sahamazava Andapa, Commune Andapa, District Andapa T 03-19/SOF / Travaux de réhabilitations des bureaux Component 3: Project Single Stage - One 2019-05- 2019-08- 2019-05- 2019-06- 2019-09- 2019-07- 2019-10- 2019-08- 2019-11- 2020-01- de la DRAEP Sofia : COFN / C1540 Management Coordination Post Request for Bids Open - National 100,000.00 80,022.23 Signed Envelope 24 14 29 28 16 08 25 12 14 09 Lot 01 : Antsohihy and M&E Lot 02 : Bealanana T 01-19/ANJ / Travaux de réhabilitation des ouvrages Component 2: Investments Single Stage - One 239,627.2 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-08- sur canaux d'irrigation COFN / C1540 and capacity building in Post Request for Bids Open - National 427,520.00 Completed Envelope 6 21 14 21 23 18 07 03 02 19 30 dans le périmètre de the selected landscapes Sahavaviana-Iazafo. T 02-19/ANJ / Travaux de Component 2: Investments réhabilitation des barrages Single Stage - One 328,571.9 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-08- COFN / C1540 and capacity building in Post Request for Bids Open - National 427,520.00 Signed de dérivation dans le Envelope 5 21 14 21 23 18 07 03 02 19 30 the selected landscapes périmètre de Sahanofia- Iazafo. T 02-19/SOF / Travaux d'aménagement du périmètre de Bealanana I Lot 01 : La partie amont du Component 2: Investments Single Stage - One 500,253.0 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-06- 2019-05- 2019-11- PM 580 sur le canal COFN / C1540 and capacity building in Post Request for Bids Open - National 756,250.00 Signed Envelope 1 11 05 21 20 04 05 24 05 24 02 principal de la rive droite. the selected landscapes Lot 02 : La partie aval du PM 580 sur le canal principal de la rive droite. T 01-19/SOF / Construction des ouvrages hydraulique et piste d'entretien dans le PI Mangindrano: Lot 1:BARRAGE Component 2: Investments Single Stage - One 2,188,071. 1,554,350 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-06- 2019-05- 2019-11- ANTAFIANAMALONA COFN / C1540 and capacity building in Post Request for Bids Open - National Signed Envelope 87 .58 11 05 21 20 04 05 24 05 24 02 Lot 2:CANAL CPRD DU PM the selected landscapes 2153 - BOUT DU RESEAU Lot 3:CANAL CPRG 1er TRONÇON DE 2921 ML Lot 4:CANAL CPRG 2ème TRONÇON DE 3261 ML Lot 5:PISTE-PONT T 03-20/SOF / Travaux Component 2: Investments d'aménagement du Single Stage - One 234,454.7 2020-04- 2020-05- 2020-05- 2020-06- 2020-07- 2020-06- 2020-08- 2020-08- 2020-09- 2021-01- COFN / C1540 and capacity building in Post Request for Bids Open - National 375,000.00 Signed périmètre d'Anjohibe- Envelope 2 30 15 10 09 06 29 17 04 11 01 the selected landscapes Ambatosia dans le Paysage de Bealanana. T 02-20/ANJ / Travaux de réhabilitation des Component 2: Investments Single Stage - One 193,722.0 2020-02- 2020-02- 2020-03- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-04- 2021-02- infrastructures COFN / C1540 and capacity building in Post Request for Bids Open - National 340,000.00 Signed Envelope 1 28 01 14 13 10 03 24 03 27 08 hydroagricoles dans le the selected landscapes périmètre d'Iazafo- Mahatsara - Andapatsara T 05-19/ANJ / Travaux de réhabilitation des Component 2: Investments Single Stage - One 2019-09- 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2020-01- 2020-01- 2020-06- infrastructures COFN / C1540 and capacity building in Post Request for Bids Open - National 340,000.00 0.00 Canceled Envelope 30 10 15 14 19 04 23 04 02 hydroagricoles dans le the selected landscapes périmètre d'Iazafo- Mahatsara - Andapatsara T 04-19/SOF / Travaux de réhabilitation route non revêtue (RIP 117M) reliant Bealanana à Ambatoriha District Bealanana, Région Component 2: Investments Sofia repartis en trois (03): Single Stage - One 4,600,000. 4,790,803 2020-05- 2020-06- 2020-06- 2020-07- 2020-08- 2020-07- 2020-09- 2020-09- 2020-09- 2021-03- COFN / C1540 and capacity building in Post Request for Bids Open - National Signed Lot1:du PK 0+000-PK Envelope 00 .16 29 20 08 08 04 28 04 01 24 30 the selected landscapes 18+000. Lot2:du PK 18+000-PK 22+000. Lot3:du PK 22+000-PK 30+825 (barrière Ambatoriha). T 05-19/SAV / Travaux d'amélioration du réseau hydroagricole du périmètre Component 2: Investments Single Stage - One 359,580.4 2020-03- 2020-05- 2020-04- 2020-05- 2020-07- 2020-05- 2020-08- 2020-06- 2020-08- 2020-12- Ambalafary de 252 ha, IDA / 59790 and capacity building in Post Request for Bids Open - National 324,800.00 Signed Envelope 6 20 23 02 02 07 22 06 26 20 23 Commune Rurale the selected landscapes Ambodidivaina, District Andapa, Région SAVA T 03-19/SAV / Travaux de reconstruction du réseau hydroagricole de la grappe Component 2: Investments des périmètres Andalamena Single Stage - One 248,719.7 2020-03- 2020-05- 2020-03- 2020-04- 2020-07- 2020-05- 2020-08- 2020-06- 2020-08- 2020-12- IDA / 59790 and capacity building in Post Request for Bids Open - National 313,500.00 Signed et Amboadiala de 191 ha , Envelope 1 16 23 28 27 07 17 07 21 20 18 the selected landscapes Commune Rurale Andasibe Kobahina, District Andapa, Région SAVA. T 06-19/SAV / Travaux de rénovation du réseau Component 2: Investments hydroagricole du périmètre Single Stage - One 494,317.4 2020-03- 2020-05- 2020-04- 2020-05- 2020-07- 2020-05- 2020-08- 2020-06- 2020-08- 2020-12- IDA / 59790 and capacity building in Post Request for Bids Open - National 598,500.00 Signed Tanandava sur 400 ha, Envelope 3 20 23 02 02 07 22 06 26 20 23 the selected landscapes Commune Rurale Tanandava, District Andapa, Région SAVA. T 04-19/SAV / Travaux de remise en état du réseau hydroagricole de la grappe Component 2: Investments de Périmètre Single Stage - One 2020-03- 2020-05- 2020-03- 2020-04- 2020-07- 2020-05- 2020-08- 2020-06- 2020-12- COFN / C1540 and capacity building in Post Request for Bids Open - National 412,500.00 0.00 Canceled Antanimbaribe, Envelope 16 23 28 27 07 17 07 21 18 the selected landscapes Ambatoharanana et Andasimenalamba de 244 ha, CR Ambalamanasy II, District Andapa, Région SAVA. T 02-19/SAV / Travaux de renforcement du réseau hydroagricole du Périmètre Component 2: Investments Single Stage - One 351,675.2 2020-03- 2020-05- 2020-04- 2020-05- 2020-07- 2020-05- 2020-08- 2020-06- 2020-08- 2020-12- Ambodivitagnona de IDA / 59790 and capacity building in Post Request for Bids Open - National 465,000.00 Signed Envelope 6 20 23 01 01 07 21 10 25 20 22 370ha, Commune Rurale the selected landscapes Ambalamanasy II, District Andapa, Région SAVA. T 01-20/BOE / Travaux de Component 2: Investments Under réhabilitation des réseaux Single Stage - One 343,689.9 2020-09- 2020-08- 2020-09- 2020-10- 2020-09- 2020-11- 2020-11- 2020-12- 2021-04- COFN / C1540 and capacity building in Post Request for Bids Open - National 800,000.00 Implement de drainage des secteurs Envelope 8 08 28 18 18 29 03 03 02 01 the selected landscapes ation 04, 05 et 06 répartis en trois (3) lots. T 01-19/BOE / Travaux de Component 2: Investments - Single Stage - One 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- 2020-10- 2020-09- 2022-03- curage du drain de ceinture COFN / C1540 and capacity building in Post Request for Bids Open - National 431,250.00 744,943.6 Signed Envelope 16 08 30 29 10 18 15 23 18 07 et du drain naturel the selected landscapes 4 Manompo T 02-19/BOE / Travaux de regabaritage des cours d’eau exutoire du drainage des PI Marovoay, répartis Component 2: Investments en 2 lots : Single Stage - One 299,370.0 2020-07- 2020-07- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2020-11- 2020-10- 2022-04- COFN / C1540 and capacity building in Post Request for Bids Open - National 458,000.00 Signed Lot 01: dans le secteur 5 du Envelope 0 28 17 07 16 18 11 29 21 05 20 the selected landscapes PM 2903 (Ambohijaoka) au PM 4114 (Andranodaka). Lot 02: dans le secteur 4 du PM 4114 (Andranodaka) au PM 5865 (Ambolomoty). T 02-20/SAV / Travaux de remise en état du réseau hydroagricole de la grappe de Périmètre Component 2: Investments Single Stage - One 166,314.5 2020-10- 2020-09- 2020-10- 2020-11- 2020-10- 2020-12- 2020-12- 2021-01- 2020-12- 2021-05- Antanimbaribe, COFN / C1540 and capacity building in Post Request for Bids Open - National 412,500.00 Completed Envelope 3 13 24 18 17 26 07 03 11 18 11 Ambatoharanana et the selected landscapes Andasimenalamba de 244 ha, CR Ambalamanasy II, District Andapa, Région SAVA (RELANCE). T 4-19/ANJ / Travaux de réhabilitation des canaux d'irrigation et ouvrages de franchissement dans le Component 2: Investments district de Soanierana Single Stage - One 2,720,000. 1,255,680 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-08- COFN / C1540 and capacity building in Post Request for Bids Open - National Signed Ivongo : Lot 01 : périmètre Envelope 00 .22 21 21 31 30 21 19 26 21 25 18 the selected landscapes de Marovinanto Lot 02 : périmètre de Sahafary Lot 03 : périmètre de Vohijiny Lot 04 : périmètre d'Ampasimbola T 04-19/ANJ / Travaux de réhabilitation des canaux d'irrigation et des ouvrages de franchissement dans le district de Soanierana Component 2: Investments Single Stage - One 2,720,000. 2019-07- 2019-12- 2019-07- 2019-08- 2020-01- 2019-09- 2020-02- 2019-10- 2020-03- Ivongo : COFN / C1540 and capacity building in Post Request for Bids Open - National 0.00 Canceled Envelope 00 11 21 21 20 21 09 26 04 02 Lot 01 : périmètre de the selected landscapes Marovinanto Lot 02 : périmètre de Sahafary Lot 03 : périmètre de Vohijiny Lot 04 : périmètre d'Ampasimbola T 03-19/ANJ / Travaux de remise en état des ouvrages existant et curage des drains dans le PI d'Iazaf: Lot 1:zone Mahanoro- Component 2: Investments Single Stage - One 2,550,000. 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-08- 2019-07- 2019-12- Mahatsara COFN / C1540 and capacity building in Post Request for Bids Open - National 0.00 Canceled Envelope 00 26 06 11 10 11 30 14 31 28 Lot 2:zone Ambalabe II- the selected landscapes Antsiratenina Lot 3:zone B1-B6 Lot 4:zone Maromitety Lot 5:zone Sahafana- Ambatomirahalahy Lot 6:Mahatsara-Andapat T 05-20/SAV / Travaux de repiquage mécanisé dans les communes rurales Component 2: Investments d'Andasibe Kobahina, 446,347.9 2020-10- 2020-09- 2020-11- 2020-10- 2020-12- 2020-12- 2021-01- COFN / C1540 and capacity building in Post Direct Selection Direct 450,000.00 Signed Ankiakabe Nord, 2 23 28 07 09 22 10 21 the selected landscapes Bealampona et Ambodidivaina, district d'Andapa dans le cadre de la relance de la production post-Covid. T 09-20/SOF / Reprise des travaux de réhabilitation du réseau hydroagricole du périmètre Andranomafana Component 2: Investments Mangindrano du paysage 269,166.9 2020-10- 2020-10- 2020-11- 2020-10- 2020-12- 2020-11- 2021-04- COFN / C1540 and capacity building in Post Direct Selection Direct 295,000.00 Signed de Bealanana, CR 8 27 26 06 26 06 30 05 the selected landscapes Mangindrano ; région SOFIA lot 01 : travaux sur le barrage d'Antafianamalona CPRD, partiteur, bâche et chute Page 1 T 08-20/SOF / Reprise des travaux de réhabilitation des infrastructures hydroagricoles du Component 2: Investments périmètre Bealanana 1 du 172,694.4 2020-10- 2020-10- 2020-11- 2020-10- 2020-12- 2020-10- 2021-04- COFN / C1540 and capacity building in Post Direct Selection Direct 180,000.00 Signed paysage de Bealanana, CR 0 27 02 06 02 06 07 05 the selected landscapes Bealanana district Bealanana région SOFIA- lot 01 bis : la partie amont du pm 580 sur le canal principal de la rive droite T 01-21/ANJ / Travaux de protection des berges des rivières dans les Paysages d'Iazafo et de Soanierana Ivongo: -Lot 01: Berges de la rivière Component 2: Investments Pending Single Stage - One 2021-09- 2021-09- 2021-10- 2021-11- 2021-11- 2022-03- Iazafo COFN / C1540 and capacity building in Post Request for Bids Open - National 824,600.00 0.00 Implement Envelope 10 20 20 04 24 24 -Lot 02: Berges de la rivière the selected landscapes ation Sahavaviana -Lot 03: Berges de rivière Sahafototra Lot 04: Berges de la rivière Sahave T 02-21/ANJ / Travaux de réhabilitation des pistes en terre dans le paysage d'Iazafo : -Lot 01:Piste Maromitety- Component 2: Investments Pending Ampasimazava-Mahanoro Single Stage - One 1,786,700. 2021-07- 2021-07- 2021-08- 2021-09- 2021-09- 2022-03- COFN / C1540 and capacity building in Post Request for Bids Open - National 0.00 Implement -Lot 02:Piste Maromitety- Envelope 00 08 18 17 01 21 20 the selected landscapes ation Ambalakondro-Vavazahana -Lot 03: Piste Marofototra- Mahanoro -Lot 04: Piste Ambodinonoka-Mahatera T 03-21/ANJ / Travaux de réhabilitation des barrages Component 2: Investments Pending Single Stage - One 2021-07- 2021-07- 2021-08- 2021-09- 2021-09- 2022-03- et des ouvrages connexes COFN / C1540 and capacity building in Post Request for Bids Open - National 500,000.00 0.00 Implement Envelope 09 19 18 02 27 26 de la zone the selected landscapes ation Ambatoharanana dans le paysage d'Iazafo T 04-21/ANJ / Travaux de réhabilitation des barrages et des ouvrages annexes dans le paysage de Soanierana Ivongo: Component 2: Investments Pending -Lot 01: Périmètre Single Stage - One 2021-06- 2021-07- 2021-08- 2021-08- 2021-09- 2022-01- COFN / C1540 and capacity building in Post Request for Bids Open - National 750,750.00 0.00 Implement Antanetilava Envelope 30 10 09 29 18 16 the selected landscapes ation -Lot 02:Périmètre Vohilava -Lot 03: Périmètre Ambodiboanara -Lot 04:Perimètre Diavolamaso -Lot 05:Périmètre Sahondrana T 05-21/ANJ / Travaux de réhabilitation des canaux d'irrigation et des ouvrages de franchissement pour les périmètres hydroagricoles: Component 2: Investments Pending -Lot 01:Périmètre Single Stage - One 2021-06- 2021-07- 2021-08- 2021-08- 2021-09- 2022-01- COFN / C1540 and capacity building in Post Request for Bids Open - National 775,800.00 0.00 Implement Ampoezana Envelope 28 08 07 22 11 09 the selected landscapes ation -Lot 02:Périmètre Anamborano -Lot 03:Périmètre Fandrianomby -Lot 04:Périmètre Antsirabeniseva T 06-21/ANJ / Travaux de réhabilitation des réseaux d'irrigation et de drainage Component 2: Investments Pending des périmètres suivants Single Stage - One 2021-07- 2021-07- 2021-08- 2021-08- 2021-09- 2022-01- COFN / C1540 and capacity building in Post Request for Bids Open - National 445,500.00 0.00 Implement dans la Commune Envelope 12 22 21 31 20 18 the selected landscapes ation Antanifotsy : -Lot 01:Périmètre Tsaratanana -Lot 02:Périmètre Namatoana -Lot 03:Périmètre T 07-21/ANJ Sahasoa / Travaux de réhabilitation de la piste en terre reliant Antanifotsy- Component 2: Investments Pending Single Stage - One 2021-07- 2021-07- 2021-08- 2021-09- 2021-10- 2022-01- Marogisa-Marovinanto, COFN / C1540 and capacity building in Post Request for Bids Open - National 116,200.00 0.00 Implement Envelope 19 29 28 12 02 30 dans la Commune the selected landscapes ation Antanifotsy, district de Soanierana Ivongo-Région Analabjirofo T 04-20/BOE / Travaux de trouaison et plantation de Component 2: Investments bandes anti-érosives : Single Stage - One 2020-10- 2020-11- 2020-12- 2020-12- 2021-01- 2021-05- COFN / C1540 and capacity building in Post Request for Bids Open - National 200,000.00 0.00 Canceled Lot 1: CR Ambolomoty Envelope 30 09 09 29 27 27 the selected landscapes Lot 2: CR Tsararano lot 3: CR Anosinalainolona T 01-21/BOE / Travaux de construction dans les CR d'Ambolomoty, de Tsararano et Component 2: Investments Pending d'Anosinalainolona Single Stage - One 2021-03- 2021-03- 2021-04- 2021-04- 2021-06- 2021-09- COFN / C1540 and capacity building in Post Request for Bids Open - National 80,000.00 0.00 Implement lot 1: 06 ateliers d'élevage Envelope 03 13 12 27 01 29 the selected landscapes ation pilote Lot 2: 06 unités de compostage Lot 3: 3 couloirs de vaccination des bovidés T 07-20/SOF / Travaux de protection biologique des Bassins Versants: Lot 1:Ambatosia Lot 2:Antsamaka, Beandrarezona Component 2: Investments Single Stage - One 2,766,000. 2021-01- 2021-02- 2021-03- 2021-03- 2021-05- 2022-08- Lot 3:Ambodiampana, COFN / C1540 and capacity building in Post Request for Bids Open - National 0.00 Canceled Envelope 00 28 07 09 29 03 26 Bealanana the selected landscapes Lot 4:Ambatoriha, Ambararatabe, Mangindrano Lot 5: , Marotolana, Analila, Anjozoromadosy, Ankazotokana,Ambovonom by T 03-19/BOE / Travaux de Component 2: Investments Pending Single Stage - One 2021-06- 2021-07- 2021-08- 2021-08- 2021-09- 2022-01- stabilisation des grands COFN / C1540 and capacity building in Post Request for Bids Open - National 95,000.00 0.00 Implement Envelope 30 15 14 29 16 24 lavaka the selected landscapes ation T 02-20/BOE / Travaux de stabilisation des zones Component 2: Investments Pending Single Stage - One 2021-04- 2021-04- 2021-05- 2021-06- 2021-06- 2021-10- d'érosion CPRD et CSPC COFN / C1540 and capacity building in Post Request for Bids Open - National 50,000.00 0.00 Implement Envelope 06 16 16 05 29 27 Ambolomoty composé d'un the selected landscapes ation seul lot. T 05-20/BOE / Travaux de mise en place de dispositifs Component 2: Investments Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-05- 2021-11- antiérosifs sur courbes de COFN / C1540 and capacity building in Post Request for Bids Open - National 468,000.00 0.00 Canceled Envelope 02 12 14 03 08 04 niveau dans le paysage de the selected landscapes Marovoay. T 06-20/BOE / Travaux de protection des bassins versants par la plantation d'acacia et eucalyptus répatis en 4 lots de 300 ha Lot 1: Commune d' Component 2: Investments Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-05- 2022-09- Anosinalainolona COFN / C1540 and capacity building in Post Request for Bids Open - National 480,000.00 0.00 Canceled Envelope 09 19 21 20 25 17 Lot 2: Commune de the selected landscapes Tsararano Ouest Lot 3: Commune de Tsararano Est lot 4: Commune d'Ambolomoty T 04-20/SAV / Travaux pour la protection et Component 2: Investments Pending restauration des flancs de Single Stage - One 1,257,400. 2021-06- 2021-07- 2021-08- 2021-08- 2021-10- 2022-07- COFN / C1540 and capacity building in Post Request for Bids Open - National 0.00 Implement colline (bassins versants) Envelope 00 30 10 09 29 03 30 the selected landscapes ation du Paysage d'Andapa, District d'Andapa, Région SAVA. T 01-21/SOF / La construction de 12 unités de compostage dans le paysage de Bealanana repartis en trois lots : Component 2: Investments Pending Request for Single Stage - One 2021-08- 2021-10- 2022-01- Lot 01 : 4 unités dans le COFN / C1540 and capacity building in Post Open - National 45,000.00 0.00 Implement Quotations Envelope 05 26 24 sous-paysage the selected landscapes ation d’Ambatotsia, Lot 02 : 4 unités dans le sous-paysage de Bealanana, Lot 03 : 4 unités dans le sous-paysage d’Ambatoriha. T 01-20/ANJ / Travaux de réhabilitation d'un bâtiment à usage de Banque de Component 2: Investments Pending semence communautaire: Single Stage - One 2021-08- 2021-08- 2021-09- 2021-10- 2021-11- 2022-02- COFN / C1540 and capacity building in Post Request for Bids Open - National 110,500.00 0.00 Implement -Lot 01: Banque de Envelope 20 30 29 01 05 03 the selected landscapes ation semence à Iazafo - Lot 02: Banque desemence à Soanierana Ivongo T 01-21/SAV / Reprise des National travaux de renforcement du Procurement réseau hydroagricole du Component 2: Investments Under Document - 1 2021-05- 2021-05- 2021-05- 2021-07- 2021-10- périmètre COFN / C1540 and capacity building in Post Direct Selection Direct 215,824.00 0.00 Implement Envelope 17 31 27 04 02 Ambodivitagnona, the selected landscapes ation process (Non Commune Rurale Bank-SPD) Ambalamanasy II, District Andapa, Région SAVA. T 05-20/SOF / Travaux de Component 2: Investments Lutte Antiérosive et de Single Stage - One 2,367,000. 2021-06- 2021-06- 2021-07- 2021-08- 2021-09- 2022-09- COFN / C1540 and capacity building in Post Request for Bids Open - National 0.00 Canceled restauration des sols dans Envelope 00 18 28 28 17 21 21 the selected landscapes le paysage de Bealanana. T 06-20/SOF / Travaux d'aménagement de champs Component 2: Investments Single Stage - One 2021-02- 2021-02- 2021-03- 2021-03- 2021-05- 2022-05- d'agroforesterie et COFN / C1540 and capacity building in Post Request for Bids Open - National 522,710.00 0.00 Canceled Envelope 01 06 08 28 02 02 plantation d'arbres fruitiers the selected landscapes dans le paysage de Bealanana. T 02-20/SOF / Travaux Component 2: Investments d'aménagement du Single Stage - One 2021-06- 2021-07- 2021-07- 2021-08- 2021-09- 2022-02- COFN / C1540 and capacity building in Post Request for Bids Open - National 160,000.00 0.00 Canceled périmètre de Doany dans le Envelope 21 01 31 20 24 21 the selected landscapes paysage de Bealanana. T 01-20/SAV / Travaux d'aménagement et d'installation des sites pépinières : National Lot 1: Ambalamanasy II, Procurement Component 2: Investments Pending Betsakotsako , Single Stage - One Document - 1 2021-08- 2021-09- 2021-10- 2021-10- 2021-11- 2022-03- COFN / C1540 and capacity building in Post Request for Bids Open - National 654,000.00 0.00 Implement Andranomena, Andasibe K, Envelope Envelope 31 05 05 25 29 29 the selected landscapes ation Marovato, Belaoka, process (Non Matsohely Bank-SPD) Lot 2: Ambodiangezoka, Ambodidivaina, Bealampona, Ankiakabe , Ambodimanga I, Tanandava, Andapa T 07-19/SAV / Traitement et stabilisation des quatres (04) lavaka dans les Component 2: Investments Single Stage - One 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- anciennes zones IDA / 59790 and capacity building in Post Request for Bids Open - National 61,820.00 0.00 Canceled Envelope 31 15 15 04 08 07 d'exploitation minières à the selected landscapes Andasinimaro, Commune Rurale Bealampona, District Andapa, Région SAVA T 3-19/ANJ. / Travaux de remise en état ouvrages et curage des drains dans le PI d'Iazaf: Lot 1:zone Request for Bids Component 2: Investments Pending Mahanoro-Mahatsara Lot Single Stage - One - Small Works 2,550,000. 2019-05- 2019-05- 2019-06- 2019-07- 2019-08- 2020-02- COFN / C1540 and capacity building in Post Request for Bids Open - National 0.00 Implement 2:zone Ambalabe II- Envelope SPD (1 envelope 00 06 11 22 22 26 22 the selected landscapes ation Antsiratenina Lot 3:zone B1- process) B6 Lot 4:zone Maromitety Lot 5:zone Sahafana- Ambatomirahalahy Lot 6:Mahatsara-Andapatsara T 03-20/SAV / Travaux Component 2: Investments d'aménagement des zones Single Stage - One 2021-06- 2021-07- 2021-08- 2021-08- 2021-09- 2022-07- COFN / C1540 and capacity building in Post Request for Bids Open - National 140,000.00 0.00 Canceled à forte érosion au niveau Envelope 28 03 02 22 26 23 the selected landscapes du paysage d'Andapa. Page 2 T 04-20/SOF / Travaux de Request for Bids Component 2: Investments Pending stabilisation des lavaka Single Stage - One - Works French 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-05- COFN / C1540 and capacity building in Post Request for Bids Open - National 220,000.00 0.00 Implement dans le sous-paysage Envelope Civil Law 31 15 15 04 10 09 the selected landscapes ation Ambatoriha Est, Bealanana (French) SPD et Ambatosia. T 01-20/SOF / Travaux Request for Bids Component 2: Investments Pending d'aménagement du Single Stage - One - Works French 1,600,000. 2021-08- 2021-09- 2021-10- 2021-10- 2021-11- 2022-04- COFN / C1540 and capacity building in Post Request for Bids Open - National 0.00 Implement périmètre irrigué de Envelope Civil Law 00 31 10 10 30 30 29 the selected landscapes ation Beandrarezona dans le (French) SPD Paysage de Bealanana. GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned Actual F 18-17/CN / Acquisition Component 3: Project UN Agencies 2017-11- 2017-11- 2017-12- 2018-03- 2018-01- 2018-06- des 10 Voitures et des 20 IDA / V0430 Management Coordination Post Direct 500,000.00 341,428.00 Signed (Direct) 27 23 27 22 29 20 Motos and M&E F 01-17/CN / Fournitures des matériels informatiques: - Lot 01:08 ordinateurs de Component 3: Project bureau (desktop) avec 01 Request for Single Stage - One 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2017-12- 2018-01- IDA / V0430 Management Coordination Post Limited 70,000.00 0.00 Canceled onduleur de chaque et 10 Proposals Envelope 30 05 05 19 21 19 23 10 27 16 and M&E ordinateurs portable (Laptop). - Lot 02: fournitures des accessoires informatiques 09 imprimantes, 09 scanners, - lot 03: 06 MG-UGP phootcopieu PADAP-38789- GO-RFP / L'acquisition des Component 3: Project fournitures de bureau, Request for Single Stage - One 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- IDA / V0430 Management Coordination Post Limited 20,000.00 0.00 Canceled consommables Proposals Envelope 30 05 21 26 03 23 and M&E informatiques et produits d'entretien du PADAP. F 04-18/CN / Fournitures des matériels informatiques pour Quatre cellules Component 3: Project Request for Single Stage - One 2018-03- 2018-02- 2018-05- 2018-03- 2018-06- 2018-03- régionales d'exécution : 08 IDA / V0430 Management Coordination Post Limited 12,000.00 10,848.04 Completed Quotations Envelope 26 05 20 16 19 30 ordinateurs de bureau and M&E (desktop) avec 01 onduleur de chaque. F 5-18/CN / Acquisition des matériels informatiques pour Quatre cellules Component 3: Project Request for Single Stage - One 2018-03- 2018-01- 2018-05- 2018-03- 2018-06- 2018-03- régionales d'exécution : 40 IDA / V0430 Management Coordination Post Limited 80,000.00 74,307.22 Completed Quotations Envelope 24 24 20 08 19 28 ordinateurs portables and M&E (laptop) avec une disque dure externe de chaque. MG-UGP PADAP-55622- GO-DIR / Migration en Component 3: Project 2018-03- 2018-03- 2018-04- 2018-03- 2018-05- 2018-03- 2018-06- version web et Formation IDA / V0430 Management Coordination Post Direct Selection Direct 30,000.00 28,504.82 Signed 23 27 02 06 06 23 25 de logiciel TOM²PRO and M&E licence PN-BVPI pour PADAP. F 15-18/CN / L'acquisition Component 3: Project des Consommables Request for Single Stage - One 2018-07- 2018-07- 2018-09- 2018-08- 2018-10- 2018-08- IDA / 59790 Management Coordination Post Limited 9,400.00 3,282.13 Completed informatiques pour l'Unité Quotations Envelope 25 20 05 14 05 21 and M&E de Gestion de Projet PADAP F 06-18/CN / Acquisition de : lot 01 03 photocopieuses pour l'unité de gestion Component 3: Project Request for Single Stage - One 2018-07- 2018-08- 2018-09- 2018-09- 2018-10- 2018-09- projet PADAP. IDA / 59790 Management Coordination Post Limited 48,000.00 29,323.39 Completed Quotations Envelope 25 08 05 07 05 14 lot 02 08 photocopieuses and M&E monochromes pour les quatre cellules d'exécution régionales du PADAP. MG-UGP PADAP-38789- GO-RFQ / L'acquisition des Component 3: Project fournitures de bureau, Request for Single Stage - One 2017-12- 2017-07- 2018-02- 2017-07- 2018-03- 2017-08- IDA / V0430 Management Coordination Post Limited 20,000.00 7,545.86 Completed consommables Quotations Envelope 05 05 04 14 06 25 and M&E informatiques et produits d'entretien du PADAP. F 01B-17/CN / Fournitures des matériels informatiques:- Lot 01:08 ordinateurs de bureau Component 3: Project (desktop) avec 01 onduleur Request for Single Stage - One 2017-09- 2017-09- 2017-11- 2017-10- 2017-12- 2017-11- IDA / V0430 Management Coordination Post Limited 70,000.00 46,297.28 Completed de chaque et 10 Quotations Envelope 19 06 27 27 17 06 and M&E ordinateurs portable (Laptop).- Lot 02: fournitures des accessoires informatiques 09 imprimantes, 09 scanners,- lot 03: 06 phootcopie F 12-18/CN / Acquisition de : - Lot 01 : Fournitures de Component 3: Project bureau pour l'Unité de Request for Single Stage - One 2018-11- 2019-01- 2018-12- 2019-02- 2018-12- IDA / 59790 Management Coordination Post Open - National 12,500.00 9,848.58 Completed Gestion de Projet PADAP. Quotations Envelope 18 13 26 12 28 and M&E - Lot 02 : Produits d'entretien pour l'Unité de Gestion de Projet PADAP. MG-UGP PADAP-87379- GO-DIR / Acquisition du logiciel ArcGIS auprès de la Component 1: Information 2018-11- 2018-12- 2018-11- 2018-12- 2019-01- 2019-01- 2019-01- société MAKY Engineering IDA / 59790 Post Direct Selection Direct 35,000.00 22,299.71 Completed and planning 16 24 26 30 11 29 25 et formation sur son utilisation (Stockage et gestion des données). F 01-18/BOE / Dotation de Component 2: Investments tarares pour le Centre Request for Single Stage - One 2018-11- 2019-01- 2019-03- 2019-03- IDA / 59790 and capacity building in Post Open - National 12,000.00 6,360.81 Terminated Multiplicateur de Semence Quotations Envelope 30 31 22 02 the selected landscapes de Tsararano (Marovoay) F 01-18/SAV / Dotations de 02 moto pompes suivi d'une formation sur Component 2: Investments Request for Single Stage - One 2018-11- 2019-01- 2019-02- 2019-03- 2019-03- l'utilisation et l'entretien IDA / 59790 and capacity building in Post Open - National 8,000.00 4,034.55 Completed Quotations Envelope 30 31 28 02 27 aux deux Fédérations : the selected landscapes MEVA Ambodidivaina et SOA Ankiakabe Nord F 9-18/CN / Acquisition des mobiliers de bureau pour les quatre Cellule Component 3: Project d'Exécution Régionale du Request for Single Stage - One 2018-11- 2019-01- 2019-04- 2019-02- 2019-05- IDA / 59790 Management Coordination Post Open - National 40,000.00 64,583.70 Completed PADAP repartis en 04 lots : Quotations Envelope 28 14 16 13 14 and M&E Lot 01 région SOFIA, lot 02 région Boeny, lot 03 région SAVA et lot 04 région Analanjirofo. F 02-19/BOE / Acquisition Component 2: Investments des semences pour la Request for Single Stage - One 2019-05- 2019-04- 2019-07- 2019-04- 2019-07- 2019-07- COFN / C1540 and capacity building in Post Limited 4,400.00 4,361.57 Completed diffusion des paquets Quotations Envelope 27 04 08 23 28 16 the selected landscapes technique rizicole. MG-UGP PADAP-113663- Component 3: Project GO-RFQ / Acquisition de Request for Single Stage - One 2019-06- 2019-08- 2019-08- 2019-11- 2019-11- COFN / C1540 Management Coordination Post Open - National 31,000.00 21,856.23 Completed 09 canopy pour les Quotations Envelope 04 10 29 08 04 and M&E matériels roulant du projet F 1-18/ANJ / Acquisition : lot 01 des fournitures de Component 3: Project Request for Single Stage - One 2018-12- 2019-01- 2019-03- bureau et lot 02 des IDA / 59790 Management Coordination Post Open - National 4,500.00 0.00 Canceled Quotations Envelope 05 30 01 consommables and M&E informatiques pour le CER Analanjirofo. F 05-19/SAV / Acquisition Component 2: Investments Request for Single Stage - One 2019-06- 2019-08- 2019-07- 2019-08- 2019-07- d'intrants au profit des COFN / C1540 and capacity building in Post Open - National 7,000.00 5,300.62 Completed Quotations Envelope 10 16 05 26 12 paysans formateurs (PF). the selected landscapes F 06-19/SAV / Acquisition Component 2: Investments de matériels pour le Request for Single Stage - One 2019-06- 2019-08- 2019-07- 2019-11- 2019-10- COFN / C1540 and capacity building in Post Open - National 10,620.00 7,662.18 Completed sarclage et la récolte au Quotations Envelope 10 16 05 29 17 the selected landscapes profit des paysans formateurs (PF). MG-UGP PADAP-87384- GO-RFQ / Acquisition des matériels informatiques (02 Component 1: Information Request for Single Stage - One 2018-11- 2019-01- 2019-02- Desktop) et accessoires (02 IDA / 59790 Post Open - National 35,000.00 0.00 Canceled and planning Quotations Envelope 21 20 19 imprimantes) pour le logiciel ArcGIS ( Stockage et gestion des données) plus 10 GPS. MG-UGP PADAP-113652- GO-RFQ / Acquisition des matériels et accessoires informatiques : Lot 1:11 Desktop Lot 2:11 onduleurs online Component 1: Information Request for Single Stage - One 2019-06- 2019-08- 2019-12- 2019-09- 2020-02- COFN / C1540 Post Open - National 33,000.00 134,817.17 Completed Lot 3:09 Laptop avec 01 and planning Quotations Envelope 30 29 27 28 06 disque dur externe de chaque Lot 4: imprimante : 01 A1, 06 A3 et 01 jet d'encre A4 Lot 5: 09 vidéoprojecteurs avec écran MG-UGP PADAP-116266- GO-RFQ / Acquisition des : Component 3: Project Lot 01 : 10 GPS (Global Request for Single Stage - One 2019-07- 2019-09- 2019-10- 2019-10- 2019-11- COFN / C1540 Management Coordination Post Open - National 12,000.00 46,888.43 Completed Positioning System). Quotations Envelope 03 01 18 01 22 and M&E Lot 02 : 10 appareils photos numériques. MG-UGP PADAP-120173- Component 3: Project Request for Single Stage - One 2019-07- 2019-09- 2019-12- 2019-11- 2020-02- GO-RFQ / Materiel et COFN / C1540 Management Coordination Post Open - National 75,000.00 36,864.87 Completed Quotations Envelope 11 23 27 22 03 mobiler de bureau de l'UGP. and M&E MG-UGP PADAP-120176- Component 3: Project GO-RFQ / Équipement de Request for Single Stage - One 2019-08- 2019-10- 2019-12- 2019-11- COFN / C1540 Management Coordination Post Open - National 3,000.00 5,206.72 Signed protection individuel (EPI) Quotations Envelope 04 17 27 16 and M&E du Projet. F 01-19/BOE / Acquisition de matériels pour les Component 2: Investments Request for Single Stage - One 2019-06- 2019-08- 2019-10- AUEs/Fédérations (Mini COFN / C1540 and capacity building in Post Open - National 82,000.00 0.00 Canceled Quotations Envelope 06 20 19 pelle, mini compacteur the selected landscapes motorisé et motopompe) F 01-19/SOF / Achats des Component 2: Investments Request for Single Stage - One 2019-06- 2019-09- 2019-12- 2019-10- 2019-12- intrants agricole pour COFN / C1540 and capacity building in Post Open - National 11,800.00 1,487.51 Completed Quotations Envelope 22 01 20 01 27 paysans leaders/adoptants the selected landscapes F 02-20 /SAV / Acquisition d'intrants (semences et engrais) au Component 2: Investments Request for Single Stage - One 2020-05- 2020-07- 2020-06- 2020-07- 2020-07- profit des 111 anciens COFN / C1540 and capacity building in Post Open - National 8,110.00 6,732.54 Completed Quotations Envelope 11 09 30 23 10 paysans formateurs et de the selected landscapes 50 nouveaux paysans formateurs dans le paysage d'Andapa, Région SAVA F 01-19/SAV / Acquisition Component 3: Project Request for Single Stage - One 2019-08- 2019-10- 2019-11- de deux groupes COFN / C1540 Management Coordination Post Open - National 5,000.00 0.00 Canceled Quotations Envelope 19 29 28 électrogènes de la CER and M&E SAVA. F 02-19/SOF / Dotation en Component 2: Investments Request for Single Stage - One 2019-04- 2019-06- 2019-07- matériels et équipements COFN / C1540 and capacity building in Post Open - National 15,310.00 0.00 Canceled Quotations Envelope 03 13 13 de surveillance des COBA the selected landscapes F 02-19/ANJ / Acquisition de matériesl agricoles pour Component 2: Investments Request for Single Stage - One 2019-10- 2019-12- 2020-01- le reboisement dans les COFN / C1540 and capacity building in Post Open - National 15,710.00 0.00 Canceled Quotations Envelope 05 15 04 paysages de Soanierana the selected landscapes Ivongo et Iazafo. Page 3 F 06-19/ANJ / Acquisition des jeunes plants pour les Component 2: Investments Request for Single Stage - One 2019-09- 2019-11- 2020-01- activités de reboisement COFN / C1540 and capacity building in Post Open - National 23,270.00 0.00 Canceled Quotations Envelope 14 24 08 dans les paysages d'Iazafo the selected landscapes et de Soanierana Ivongo. F 02-18/BOE / Acquisition de divers articles pour le Component 3: Project Request for Single Stage - One 2018-11- 2019-01- 2019-03- fonctionnement du bureau IDA / 59790 Management Coordination Post Limited 1,700.00 0.00 Canceled Quotations Envelope 30 30 01 du Projet (Marovoay et and M&E Mahajanga) F 03-20/BOE / Acquisition Component 2: Investments Under de tarare pour le centre Request for Single Stage - One 2020-06- 2020-08- 2020-11- COFN / C1540 and capacity building in Post Open - National 21,875.00 20,276.70 Implementa multiplicateur de semence Quotations Envelope 04 30 28 the selected landscapes tion à Tsararano (RELANCE) F 04-20/SAV / Acquisition des balances automatiques Component 2: Investments Request for Single Stage - One 2020-04- 2020-06- 2020-06- 2020-07- 2020-08- force de 20kg pour les COFN / C1540 and capacity building in Post Open - National 1,250.00 794.36 Completed Quotations Envelope 20 23 30 23 19 semenciers dans le paysage the selected landscapes d'Andapa, Région SAVA. F 03-20/SAV / Acquisition de 31 panneaux Component 2: Investments Request for Single Stage - One 2020-03- 2020-05- 2020-06- d'indication pour les sites COFN / C1540 and capacity building in Post Open - National 1,300.00 0.00 Canceled Quotations Envelope 12 25 24 de reboisemnt dans le the selected landscapes paysage d'Andapa, Région SAVA. F 05-20/CN / Acquisition Component 3: Project UN Agencies 2020-02- 2020-03- 2020-04- 2020-10- d'un véhicule 4x4 pick-up IDA / V0430 Management Coordination Post Direct 83,500.00 0.00 Canceled (Direct) 28 09 23 20 du PADAP and M&E F 01-20/CN / Acquisition de 4 véhicules (Motos) pour Component 2: Investments Request for Single Stage - One 2020-03- 2020-05- 2020-07- les agents communaux COFN / C1540 and capacity building in Post Open - National 16,000.00 0.00 Canceled Quotations Envelope 04 17 16 chargés de l'appui aux the selected landscapes Communautés Locales à l'approche LIFE MG-UGP PADAP-76372- GO-RFQ / Acquisition d’images satellitaires à Component 1: Information Request for Open - Single Stage - One 2020-04- 2020-06- 2020-08- haute résolution avec COFN / C1540 Post 50,000.00 0.00 Canceled and planning Quotations International Envelope 08 18 17 modèle numérique de terrain pour le paysage de Bealanana, d’une superficie de 2776 km2 environ. F 04-20/ANJ / Achat d'intrants agricoles: Lot 01: Engrais minéraux Lot 02: Engrais organiques Lot 03: Semences: riz Component 2: Investments Pending améliorés, de base, maïs et Request for Single Stage - One 2021-06- 2021-09- 2021-10- COFN / C1540 and capacity building in Post Open - National 89,280.00 0.00 Implementa haricot Quotations Envelope 25 07 07 the selected landscapes tion Lot 04: Semences: tephrosia et stylosanthes Lot 05: Eclats de souches de Bachiaria et Pennisetum Lot 06: Semence riz F 06-20/BOE / Acquisition de manguiers Component 2: Investments Lot 01 : Site d'Ambolomoty Request for Single Stage - One 2020-10- 2020-12- 2020-12- 2021-02- COFN / C1540 and capacity building in Post Open - National 97,500.00 9,896.21 Signed Lot 02 : Site de Tsararano Quotations Envelope 05 16 11 14 the selected landscapes Lot 03: Site d'Anosinalainolona F 07-20/BOE / Acquisition Component 2: Investments Request for Single Stage - One 2020-09- 2020-12- 2020-11- 2021-03- d'acacia pour la protection COFN / C1540 and capacity building in Post Open - National 98,000.00 96,805.52 Signed Quotations Envelope 26 01 11 31 du sol the selected landscapes F 08-20/BOE / Acquisition Component 2: Investments d'eucalyptus pour le Request for Single Stage - One 2020-09- 2020-12- 2020-11- 2021-03- COFN / C1540 and capacity building in Post Open - National 98,500.00 101,868.48 Signed reboisement à vocation Quotations Envelope 26 01 11 31 the selected landscapes bois d'œuvre F 09-20/BOE / Acquisition Component 2: Investments de plantule pour le Request for Single Stage - One 2020-10- 2020-12- 2020-11- 2021-04- COFN / C1540 and capacity building in Post Open - National 12,500.00 14,002.23 Signed regarnissage des terrains Quotations Envelope 05 10 11 09 the selected landscapes de reboisement 2019 - 2020 F 06-19/BOE / Acquisition Component 2: Investments d'engrais Request for Single Stage - One 2020-09- 2020-11- 2020-12- 2021-11- COFN / C1540 and capacity building in Post Open - National 97,000.00 29,536.56 Signed Lot 1: Engrais organique Quotations Envelope 22 28 11 28 the selected landscapes Lot 2: NPK et Urée F 10-20/BOE / Acquisition de bouture et de haie vive Component 2: Investments Request for Single Stage - One 2020-10- 2020-12- 2020-12- 2021-03- Lot 1: Stylosanthès COFN / C1540 and capacity building in Post Open - National 98,000.00 30,351.26 Signed Quotations Envelope 05 10 11 10 lot 2: Brachiaria the selected landscapes Lot 3: Vétiver F 11-20/BOE / Acquisition de matériel végétal et de Component 2: Investments culture vivrière Request for Single Stage - One 2020-09- 2020-12- 2020-12- 2021-01- COFN / C1540 and capacity building in Post Open - National 96,000.00 2,228.17 Signed Lot 1: arachide, riz pluvial, Quotations Envelope 27 02 11 01 the selected landscapes Maïs Lot 2: Bouture de manioc F 12-20/BOE / Acquisition des citronniers Component 2: Investments Lot 01 : Site d'Ambolomoty Request for Single Stage - One 2020-10- 2020-12- 2020-12- 2021-02- COFN / C1540 and capacity building in Post Open - National 95,000.00 19,160.49 Signed Lot 02 : Site de Tsararano Quotations Envelope 05 10 11 08 the selected landscapes Lot 03: Site d'Anosinalainolona F 13-20/BOE / Achat d'orangiers : Component 2: Investments Lot 01 : Site d'Ambolomoty Request for Single Stage - One 2020-10- 2020-12- 2020-12- 2021-02- COFN / C1540 and capacity building in Post Open - National 98,400.00 15,892.82 Signed Lot 02 : Site de Tsararano Quotations Envelope 05 10 11 08 the selected landscapes Lot 03: Site d'Anosinalainolona F 03-19/ANJ / Achat d'intrants agricoles pour:les payasns formateurs, semenciers, adoptants et Component 2: Investments banques de semences: Lot Request for Single Stage - One 2020-09- 2020-11- 2020-12- COFN / C1540 and capacity building in Post Open - National 89,500.00 0.00 Canceled 01: Engrais minéral et Quotations Envelope 01 11 26 the selected landscapes organique Lot 02: Semences rizicoles Lot 03: Matériels végétaux pour l'agroécologie et production fourragère F 03-20/ANJ / Acquisition Component 2: Investments de jeunes plants de culture Request for 2020-08- 2020-11- 2020-08- 2021-01- COFN / C1540 and capacity building in Post 22,150.00 10,262.33 Signed de rente pour Quotations 28 10 25 09 the selected landscapes l'agroforesterie à Iazafo et Soanierana Ivongo F 04-19/SOF / Achat des Component 2: Investments Request for Single Stage - One 2019-06- 2019-09- 2019-10- équipement agricole pour COFN / C1540 and capacity building in Post Open - National 36,600.00 0.00 Canceled Quotations Envelope 23 02 02 paysans leaders/adoptants. the selected landscapes Component 2: Investments F 07-19/BOE / Acquisition Request for Single Stage - One 2019-09- 2019-11- 2019-12- COFN / C1540 and capacity building in Post Open - National 33,000.00 0.00 Canceled des jeunes plants. Quotations Envelope 24 30 30 the selected landscapes F 09-20/CN / Acquisition Component 3: Project de fournitures de bureau Request for Single Stage - One 2020-12- 2020-12- 2021-01- 2021-03- 2021-02- 2021-03- COFN / C1540 Management Coordination Post Open - National 4,000.00 3,828.99 Completed pour l'Unité de Gestion de Quotations Envelope 10 17 24 12 23 22 and M&E Projet PADAP F 01-20/BOE / Acquisition Component 2: Investments Request for Single Stage - One 2021-02- 2021-05- 2021-11- de semence pour la COFN / C1540 and capacity building in Post Open - National 2,200.00 0.00 Canceled Quotations Envelope 20 25 21 diffusion des paquets the selected landscapes techniques agricoles F 3-20/BOE / Acquisition Component 2: Investments de tarare pour le centre Request for Single Stage - One 2020-06- 2020-09- 2020-07- 2020-11- COFN / C1540 and capacity building in Post Open - National 21,900.00 19,670.17 Signed multiplicateur de semence Quotations Envelope 06 01 08 30 the selected landscapes à Tsararano. F 04-20/CN / Acquisition Component 3: Project Request for Single Stage - One 2020-11- 2020-12- 2021-01- 2021-03- 2021-02- de 7 coffres forts du COFN / C1540 Management Coordination Post Open - National 2,250.00 7,641.34 Signed Quotations Envelope 15 17 14 17 13 PADAP. and M&E F 07-20/CN / Acquisition Component 3: Project Request for Single Stage - One 2020-11- 2020-12- 2021-01- 2021-03- 2021-03- 2021-03- de matériels informatiques COFN / C1540 Management Coordination Post Open - National 3,000.00 2,796.37 Completed Quotations Envelope 07 17 16 17 17 31 du PADAP: 9 stabilisateurs and M&E F 08-20/CN / Acquisition Component 3: Project Request for Single Stage - One 2020-11- 2020-12- 2021-01- 2021-03- 2021-02- 2021-03- des 09 vidéoprojecteurs COFN / C1540 Management Coordination Post Open - National 25,000.00 17,232.84 Completed Quotations Envelope 07 17 06 09 05 10 avec écran du PADAP. and M&E F 04-19/SAV / Acquisition Component 3: Project des consommables Request for Single Stage - One 2020-11- 2021-01- 2020-12- 2021-02- COFN / C1540 Management Coordination Post Open - National 21,880.00 21,420.49 Signed informatiques pour la CER Quotations Envelope 28 10 21 09 and M&E SAVA F 02-19/SAV / Acquisition Component 3: Project Request for Single Stage - One 2020-11- 2021-01- 2020-12- 2021-02- des fournitures de bureau COFN / C1540 Management Coordination Post Open - National 21,880.00 13,631.51 Signed Quotations Envelope 30 12 21 11 pour la CER SAVA. and M&E F 05-20/SAV / Acquisition d'intrants agricoles repartis en quatre lots: Lot1 : Semences de base Component 2: Investments Lot2 : semences certifiées Request for Single Stage - One 2020-12- 2021-02- 2021-01- 2021-03- COFN / C1540 and capacity building in Post Open - National 34,000.00 19,235.18 Signed de riz irrigué Quotations Envelope 05 08 05 10 the selected landscapes Lot 3 : Engrais organique Lot 4 : Urée Lot 5 : Graines pour 56 sites de pépinières permanente. F 01-20/SAV / Acquisition des panneaux d'indication des sites dans le paysage Component 2: Investments Request for Single Stage - One 2020-11- 2021-02- 2020-12- 2021-03- d'Andapa, Région SAVA : COFN / C1540 and capacity building in Post Open - National 8,600.00 7,829.69 Signed Quotations Envelope 28 11 21 13 Lot 01: sites de the selected landscapes reboisement Lot 02 : sites de parcelle de démonstration F 14-20/CN / Achat de Component 3: Project Produits d'entretien pour Request for Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- COFN / C1540 Management Coordination Post Open - National 3,000.00 0.00 Canceled l'Unité de Gestion de Projet Quotations Envelope 10 17 24 23 and M&E PADAP F 15-20/CN / Achat de Component 3: Project consommable Request for Single Stage - One 2020-12- 2020-12- 2021-01- 2021-03- 2021-02- 2021-03- COFN / C1540 Management Coordination Post Open - National 20,500.00 18,530.15 Completed informatiques pour l'Unité Quotations Envelope 10 17 24 12 23 22 and M&E de Gestion de Projet PADAP F 06-20/CN / Acquisition Component 3: Project Request for Single Stage - One 2020-11- 2021-01- 2021-02- des matériels de lavage à COFN / C1540 Management Coordination Post Open - National 1,500.00 0.00 Canceled Quotations Envelope 15 14 13 haute pression du PADAP. and M&E F 07-20/SAV / Acquisition pour les vétérinaires mandataires en vue d’améliorer la santé Component 2: Investments des animaux d’élevage au Request for Single Stage - One 2020-12- 2021-02- 2021-03- COFN / C1540 and capacity building in Post Open - National 5,000.00 0.00 Canceled niveau du paysage Quotations Envelope 12 25 27 the selected landscapes d’Andapa : Lot 1 : 02 (deux) réfrigérateurs solaires Lot 2 : 02 (deux) kits de vaccination F 02-20/SOF / Acquisitions de semences Component 2: Investments certifiées de riz irrigué Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-04- COFN / C1540 and capacity building in Post Open - National 75,000.00 40,209.69 Signed pour le Paysage de Quotations Envelope 11 08 10 22 the selected landscapes Bealanana : LOT 01: riz certifiées X- 265 Lot 02 : riz certifiées MK- 34 Page 4 F 03-20/SOF / Acquisition arbres fruitiers: Lot1: 5 000 pommier porte- greffe Lot2: 20 000 variété améliorée de pommier Component 2: Investments Pending Lot3: 5 000 pêcher porte- Request for Single Stage - One 2021-01- 2021-03- 2021-07- COFN / C1540 and capacity building in Post Open - National 86,000.00 0.00 Implementa greffe Quotations Envelope 11 03 31 the selected landscapes tion Lot4: 20 000 variété améliorée de pêcher Lot5: 5 000 poirier porte- greffe Lot6: 20 000 variété améliorée de poirier F 04-20/SOF / Acquisition de fumier de parc pour la Component 2: Investments Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-05- mise en œuvre de la COFN / C1540 and capacity building in Post Open - National 100,000.00 67,305.70 Signed Quotations Envelope 11 05 08 04 riziculture et de the selected landscapes l'agroforesterie dans le paysage de Bealanana. F 05-20/SOF / Acquisition d'agrumes : Lot 1: 20 000 greffes de mandarinier ou de greffes Component 2: Investments d'oranger Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-08- COFN / C1540 and capacity building in Post Open - National 80,000.00 45,208.10 Signed Lot 2: 10 000 de citronnier Quotations Envelope 11 08 08 05 the selected landscapes Lot 3: 10 000 greffes de Pamplemoussiers Lot 4: 30 000 porte-greffes de la famille de mandarinier F 07-20/SOF / Acquisition des jeunes plants de caféier en 2 lots pour le paysage Component 2: Investments de Bealanana: Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-08- COFN / C1540 and capacity building in Post Open - National 91,450.00 31,516.80 Signed Lot 01: 5 000 de caféier Quotations Envelope 11 08 09 05 the selected landscapes Robusta Lot 02: 75 000 de caféier Arabica F 08-20/SOF / Acquisition Component 2: Investments d'Engrais organique de type Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-04- COFN / C1540 and capacity building in Post Open - National 54,400.00 38,341.43 Signed Guano pour le Paysage de Quotations Envelope 11 05 09 19 the selected landscapes Bealanana F 09-20/SOF / Acquisition des jeunes plants pour Component 2: Investments Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-06- stabilisation de terrains COFN / C1540 and capacity building in Post Open - National 99,500.00 57,812.66 Signed Quotations Envelope 21 17 04 15 dégradés (Ambararatabe the selected landscapes Nord - Ambatoriha Est) F 10-20/SOF / Fourniture Component 2: Investments des jeunes plants pour Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-06- COFN / C1540 and capacity building in Post Open - National 99,000.00 57,812.66 Signed protection des pistes Quotations Envelope 21 28 04 26 the selected landscapes ruraux (Antsamaka - Beandrarezona) F 11-20/SOF / Achat des Component 2: Investments Request for Single Stage - One 2021-01- 2021-03- 2021-06- jeunes plants pour COFN / C1540 and capacity building in Post Open - National 99,500.00 0.00 Canceled Quotations Envelope 16 23 21 production de bois énergie the selected landscapes (Ambatosia) F 12-20/SOF / Achat des Component 2: Investments Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-06- jeunes plants pour COFN / C1540 and capacity building in Post Open - National 99,400.00 67,907.88 Signed Quotations Envelope 11 18 09 16 production de bois d'œuvre the selected landscapes (Ambatosia) F 13-20/SOF / Fourniture Component 2: Investments des jeunes plants pour Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-06- COFN / C1540 and capacity building in Post Open - National 99,000.00 57,239.35 Terminated protection des périmètres Quotations Envelope 11 18 10 16 the selected landscapes irrigués à réhabiliter par le Projet F 14-20/SOF / Acquisition Component 2: Investments de jeunes plants pour Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-06- COFN / C1540 and capacity building in Post Open - National 80,000.00 43,641.23 Terminated protection des Lacs et Quotations Envelope 11 18 15 16 the selected landscapes Etangs (Bealanana - Beandrarezona) F 15-20/SOF / Fourniture des plants pour Component 2: Investments Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-09- restauration des forêts COFN / C1540 and capacity building in Post Open - National 99,000.00 92,215.65 Signed Quotations Envelope 11 18 09 14 dégradées (Analila - the selected landscapes Anjozoromadosy- Marotolana - Ankazotokana) F 16-20/SOF / Acquisition des jeunes plants pour Component 2: Investments Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-06- restauration/conservation COFN / C1540 and capacity building in Post Open - National 99,000.00 57,926.23 Signed Quotations Envelope 11 18 04 16 des sols (Bealanana - the selected landscapes Ambodiampana) F 17-20/SOF / Fourniture des jeunes plants pour la Component 2: Investments protection autour des Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-06- COFN / C1540 and capacity building in Post Open - National 99,800.00 87,330.08 Signed zones gérées par les COBA Quotations Envelope 16 26 10 24 the selected landscapes (Mangindrano - Ambovonomby) F 18-20/SOF / Acquisition d'arbres autochtones à Component 2: Investments fruits comestibles : Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-08- COFN / C1540 and capacity building in Post Open - National 69,000.00 125,053.64 Signed Lot 1: 30 000 Jacquier Quotations Envelope 11 08 10 05 the selected landscapes produit Lot 2: 30 000 jeunes plants d'Eugenia F 19-20/SOF / Acquisition des jeunes plaqueminiers, de bibaciers et de litchi: Lot 1: 30 000 variété Component 2: Investments améliorée de plaqueminier Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-08- COFN / C1540 and capacity building in Post Open - National 86,000.00 66,761.00 Signed (Kaki) Quotations Envelope 11 08 09 05 the selected landscapes Lot 2: 25 000 variété améliorée de bibacier Lot 3: 20 000 jeunes plants de litchi F 20-20/SOF / Acquisition de manguiers 2 lots pour le paysage de Bealanana: Component 2: Investments Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-08- Lot 01: 20 000 Manguier COFN / C1540 and capacity building in Post Open - National 69,000.00 22,894.92 Signed Quotations Envelope 11 08 09 05 porte-greffe the selected landscapes Lot 02: 40 000 variétés améliorées de manguiers F 21-20/SOF / Acquisition de papayer en 2 lots : Lot 1: 40 000 de papayer Component 2: Investments Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-08- (Solo Sunset, Solo COFN / C1540 and capacity building in Post Open - National 92,000.00 39,921.28 Signed Quotations Envelope 11 08 08 05 Waimanalo, Sunrise...) the selected landscapes Lot2: 40 000 d'avocatier de race MEXICAIN. F 22-20/SOF / Acquisition Component 2: Investments de dolomie agricole de Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-04- COFN / C1540 and capacity building in Post Open - National 64,000.00 43,150.08 Signed redressement du sol pour Quotations Envelope 16 13 09 27 the selected landscapes le Paysage de Bealanana F 23-20/SOF / Acquisition Component 2: Investments d'intrants agricoles de Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-04- COFN / C1540 and capacity building in Post Open - National 89,000.00 56,716.05 Signed synthèse (NPK et Urée) pour Quotations Envelope 16 13 10 27 the selected landscapes le Paysage de Bealanana F 24-20/SOF / Acquisition Component 2: Investments Pending de matériels végétaux pour Request for Single Stage - One 2021-01- 2021-03- 2021-05- COFN / C1540 and capacity building in Post Open - National 98,000.00 0.00 Implementa plante de couverture dans Quotations Envelope 16 23 07 the selected landscapes tion le Paysage de Bealanana F 25-20/SOF / Acquisition Component 2: Investments de Semences de Brachiaria Request for Single Stage - One 2021-01- 2021-03- 2020-12- 2021-04- COFN / C1540 and capacity building in Post Open - National 95,000.00 106,338.91 Terminated ou de Stylosanthès dans le Quotations Envelope 16 21 14 20 the selected landscapes paysage de Bealanana. F 05-19/BOE / Acquisition des matériels agricole Component 2: Investments Pending (Sarcleuse, charrue à soc, Request for Single Stage - One 2021-02- 2021-04- 2021-05- COFN / C1540 and capacity building in Post Open - National 43,800.00 0.00 Implementa herse à dents, Quotations Envelope 22 30 30 the selected landscapes tion pulvérisateur, batteuse à pédale, bâche) pour une année. F 08-20/SAV / Acquisition Component 3: Project des produits d'entretien Request for Single Stage - One 2021-02- 2021-04- 2021-05- COFN / C1540 Management Coordination Post Open - National 3,130.00 0.00 Canceled pour la Cellule d'Exécution Quotations Envelope 03 09 09 and M&E Régionale SAVA (RELANCE). F 03-19/SAV / Acquisition Component 3: Project Request for Single Stage - One 2020-11- 2021-01- 2021-02- des produits d'entretien COFN / C1540 Management Coordination Post Open - National 3,130.00 0.00 Canceled Quotations Envelope 30 12 11 pour la CER SAVA and M&E F 03-21/BOE / Acquisition Component 2: Investments Pending d' alevins pour les Request for Single Stage - One 2021-03- 2021-05- 2021-06- COFN / C1540 and capacity building in Post Open - National 97,000.00 0.00 Implementa pisciculteurs dans les CR Quotations Envelope 12 11 25 the selected landscapes tion de Marosakoa, d'Ambolomoty et de Tsararano F 04-21BOE / Acquisition de divers matériels pour les pisciculteurs dans les CR Component 2: Investments Pending Request for Single Stage - One 2021-03- 2021-05- 2021-07- de Marosakoa, COFN / C1540 and capacity building in Post Open - National 98,000.00 0.00 Implementa Quotations Envelope 07 17 01 d'Ambolomoty et de the selected landscapes tion Tsararano ( filets, bacs,glacières, fumoirs) F 01-21/ANJ / Acquisition d'Alambics et accessoires d'alambics pour les Component 2: Investments Pending Request for Single Stage - One 2021-08- 2021-11- 2022-05- paysans pratiquants la COFN / C1540 and capacity building in Post Open - National 46,060.00 0.00 Implementa Quotations Envelope 22 05 04 distillation d'essence de the selected landscapes tion girofle dans les paysages d'Iazafo et de Soanierana Ivongo. F 02-20/ BOE / Component 3: Project Request for Single Stage - One 2021-01- 2021-04- 2021-05- Acquisition de COFN / C1540 Management Coordination Post Open - National 2,000.00 0.00 Canceled Quotations Envelope 02 08 08 consommables and M&E informatiques pour 2 années F 04-21/BOE / Acquisition d’ intrants pour les riziculteurs dans les CR Component 2: Investments d'Ambolomoty, de Request for Single Stage - One 2021-03- 2021-05- 2021-04- 2021-06- COFN / C1540 and capacity building in Post Open - National 98,500.00 98,512.49 Signed Tsararano et Quotations Envelope 05 23 08 22 the selected landscapes d'Anosinalainolona Lot 1 engrais de type organique Lot 2 NPK et d' Urée F 02-21/BOE / Acquisition de semence certifiée de riz Component 2: Investments irrigué X 360 et X 398 pour Request for Single Stage - One 2021-03- 2021-05- 2021-03- 2021-06- COFN / C1540 and capacity building in Post Open - National 98,500.00 7,704.83 Signed les riziculteurs dans les CR Quotations Envelope 02 15 23 14 the selected landscapes d'Ambolomoty, de Tsararano et d'Anosinalainolona Component 3: Project F 03-19/BOE / Acquisition Request for Single Stage - One 2021-03- 2021-06- 2021-04- 2021-07- COFN / C1540 Management Coordination Post Open - National 3,400.00 3,612.33 Signed des fournitures de bureau Quotations Envelope 22 02 19 02 and M&E Component 2: Investments Pending F 01-20/SOF / Achat de Request for Single Stage - One 2021-07- 2021-09- 2021-10- COFN / C1540 and capacity building in Post Open - National 15,000.00 0.00 Implementa matériels agricoles. Quotations Envelope 10 22 22 the selected landscapes tion F 06-20/SAV / Acquisition Component 2: Investments d'équipements pour les 4 Request for Single Stage - One 2021-03- 2021-04- 2021-03- 2021-05- COFN / C1540 and capacity building in Post Open - National 6,810.00 2,660.40 Signed COBAS dans le paysage Quotations Envelope 03 26 31 26 the selected landscapes d'Andapa, Région SAVA; F 09-20/SAV / Acquisition des matériels pour la mise en oeuvre des activités Component 2: Investments liées à la production des Request for Single Stage - One 2021-02- 2021-04- 2021-03- 2021-05- COFN / C1540 and capacity building in Post Open - National 22,000.00 19,805.99 Signed jeunes plants de 56 sites Quotations Envelope 03 19 31 19 the selected landscapes pépinières polyvalents dans les 14 Communes du Paysage d'Andapa Page 5 F 26-20/SOF / Achat d'un pont bascule mobile pour pesage camion (30 T) en Component 2: Investments Pending vue de la collecte des fonds Request for Single Stage - One 2021-08- 2021-10- 2021-12- COFN / C1540 and capacity building in Post Open - National 60,000.00 0.00 Implementa d'entretiens pour Quotations Envelope 07 20 04 the selected landscapes tion la pérennité de la route RIP 117 M Bealanana - Ambatoriha Est F 02-21/ANJ / Achat d'engrais minéraux pour Component 2: Investments les Paysans Formateurs (PF) Request for Single Stage - One 2021-03- 2021-05- 2021-05- COFN / C1540 and capacity building in Post Open - National 9,500.00 0.00 Canceled et les Paysans Semenciers Quotations Envelope 26 16 22 the selected landscapes (PS) dans les paysages d'Iazafo et de Soanierana Ivongo F 27-20/SOF / Achat des petits matériels d'entretien Component 2: Investments Pending (brouettes, gants, gilets, Request for Single Stage - One 2021-10- 2021-12- 2022-02- COFN / C1540 and capacity building in Post Open - National 16,000.00 0.00 Implementa etc.) pour la pérennité de la Quotations Envelope 05 18 01 the selected landscapes tion route RIP 117 M Bealanana - Ambatoriha Est F 2-21/ANJ / Achat d'engrais minéraux pour Component 2: Investments les Paysans Formateurs (PF) Request for Single Stage - One 2021-05- 2021-02- 2021-07- 2021-03- 2021-08- COFN / C1540 and capacity building in Post Limited 9,500.00 10,185.75 Signed et les Paysans Semenciers Quotations Envelope 27 10 16 12 05 the selected landscapes (PS) dans les paysages d'Iazafo et de Soanierana Ivongo. F 13-20/CN / Acquisition Component 2: Investments Pending Request for Single Stage - One 2021-07- 2021-09- 2021-10- de 12 GPS pour les Services COFN / C1540 and capacity building in Post Open - National 7,000.00 0.00 Implementa Quotations Envelope 10 18 18 techniques déconcentrées. the selected landscapes tion F 11-20/CN / Acquisition de 43 motos pour les régions d'intervention du Projet (dont : 7 motos pour Component 2: Investments Pending Single Stage - One 2021-06- 2021-07- 2021-08- 2021-08- 2021-10- 2022-04- les fédérations des AUEs, COFN / C1540 and capacity building in Post Request for Bids Limited 253,520.00 0.00 Implementa Envelope 30 10 09 29 03 01 24 motos pour les Services the selected landscapes tion techniques déconcentrées et 12 motos pour les nouveaux agent du Projet. F 10-20/CN / Acquisition de réfrigérateurs solaires (RS) et kits de vaccination (KV): Component 2: Investments Pending Request for Single Stage - One 2021-07- 2021-08- 2021-10- Lot 1: 2 RS et 2 KV pour le COFN / C1540 and capacity building in Post Open - National 47,500.00 0.00 Implementa Quotations Envelope 10 30 14 Paysage d’Andapa the selected landscapes tion Lot 2: 3 RS et 3 KV pour le Paysage de Bealalana Lot 3: 2 RS et 2 KV pour le paysage de Marovoay F 02-20/CN / Conception et fourniture de supports Component 2: Investments Pending Request for Single Stage - One 2021-07- 2021-09- 2021-10- de communication pour le COFN / C1540 and capacity building in Post Open - National 9,500.00 0.00 Implementa Quotations Envelope 05 17 17 PADAP (Flyers, banderôles, the selected landscapes tion T-shirt, Polo, …) F 01-21/SAV / Acquisition des intrants pour la Component 2: Investments 2021-04- 2021-04- 2021-05- 2021-04- 2021-06- 2021-04- 2022-04- mécanisation des travaux COFN / C1540 and capacity building in Post Direct Selection Direct 59,760.00 61,074.43 Signed 29 26 04 26 18 04 14 de repiquage dans le the selected landscapes paysage d'Andapa. F 02-21/SAV / Acquisition de Graines pour les 56 sites Component 2: Investments Request for Single Stage - One 2021-05- 2021-05- 2021-06- 2021-06- pépinières polyvalents dans COFN / C1540 and capacity building in Post Open - National 20,400.00 3,833.58 Signed Quotations Envelope 02 30 01 14 les 14 Communes du the selected landscapes Paysage d'Andapa (RELANCE) F 03-19/SOF / Acquisition Pending Component 1: Information Request for Single Stage - One 2021-07- 2021-09- 2021-10- d'un kit solaire pour la CER COFN / C1540 Post Open - National 8,000.00 0.00 Implementa and planning Quotations Envelope 03 12 12 Sofia. tion F 01-19/ANJ / Fourniture Component 2: Investments Request for Single Stage - One 2021-05- 2021-07- 2021-10- de bureau pour la CER COFN / C1540 and capacity building in Post Open - National 40,000.00 0.00 Canceled Quotations Envelope 15 23 11 Analanjirofo. the selected landscapes F 04-19/ANJ / Acquisition Component 3: Project des consommables Request for Single Stage - One 2021-05- 2021-07- 2021-08- COFN / C1540 Management Coordination Post Open - National 27,000.00 0.00 Canceled informatiques pour la CER Quotations Envelope 25 30 29 and M&E Analanjirofo. F 05-19/ANJ / Acquisition Component 3: Project Request for Single Stage - One 2021-04- 2021-07- 2021-08- des produits d'entretien COFN / C1540 Management Coordination Post Open - National 43,530.00 0.00 Canceled Quotations Envelope 30 08 07 pour la CER Analanjirofo and M&E F 03-21/SAV / Acquisition d'intrants agricoles au profit des Paysans Formateurs du paysage Component 2: Investments Pending d'Andapa, répartis en trois Request for Single Stage - One 2021-07- 2021-09- 2021-10- COFN / C1540 and capacity building in Post Open - National 8,000.00 0.00 Implementa lots : Quotations Envelope 19 27 12 the selected landscapes tion - Lot 1 : Semences certifiées de riz irrigué - Lot 2 : Engrais organique de type Guano - Lot 3 : Urée" F 10-20/SAV / Acquisition des 56 lots des EPI (Bottes, Combinaisons, Gants, Imperméables) pour les Component 2: Investments Pending Request for Single Stage - One 2021-06- 2021-08- 2021-09- Pépiniéristes travaillant COFN / C1540 and capacity building in Post Open - National 7,000.00 0.00 Implementa Quotations Envelope 26 30 29 dans les sites pépinières the selected landscapes tion polyvalents dans les 14 Communes du Paysage d'Andapa F 12-20/CN / Acquisition de : Lot 1: 31 ordinateurs portable. Lot 2: 11 ordinateurs de Component 2: Investments Pending Request for Single Stage - One 2021-07- 2021-09- 2021-10- bureau avec 1 onduleur de COFN / C1540 and capacity building in Post Open - National 99,500.00 0.00 Implementa Quotations Envelope 04 12 12 chaque (05 pour les the selected landscapes tion fédérations des AUEs et 06 pour le Projet). Lot 3: 08 imprimantes laser (04 pour les fédérations des AUEs et 04 pour le Projet) F 01-21/CN / Achat de Component 3: Project Pending Produits d'entretien pour Request for Single Stage - One 2021-07- 2021-08- 2021-09- COFN / C1540 Management Coordination Post Open - National 3,500.00 0.00 Implementa l'Unité de Gestion de Projet Quotations Envelope 10 24 23 and M&E tion PADAP F 03-21/ANJ / Acquisition Component 3: Project Pending 2021-09- 2021-09- 2021-11- 2022-05- de véhicule 4x4 pick-up COFN / C1540 Management Coordination Post Direct Selection Direct 50,000.00 0.00 Implementa 15 25 09 08 pour FDAR Analanjirofo and M&E tion F 01-20/ANJ / Achat de fournitures et équipements Component 2: Investments Pending des deux (02) banques de Request for Single Stage - One 2020-09- 2020-12- 2021-01- COFN / C1540 and capacity building in Post Open - National 95,600.00 0.00 Implementa semences dans les Quotations Envelope 30 10 09 the selected landscapes tion paysages d'Iazafo et de Soanierana Ivongo F 02-20/ANJ / Acquisition de matériels agricoles: - Lot 01: 277 sarcleuses - Lot 02: 900 Sarcleuses, 180 charrues et 450 Component 2: Investments Pending Request for Single Stage - One 2021-09- 2021-11- 2021-12- fourches COFN / C1540 and capacity building in Post Open - National 66,000.00 0.00 Implementa Quotations Envelope 05 15 30 - Lot 03: 63 vanneuses et the selected landscapes tion 63 batteuses - Lot 04: 90 Pulvérisateurs, 135 arrosoirs et 9 rouleau de 100 m de gaine en polypropylène F 05-21/BOE / Acquisition de semence de riz irrigué Component 2: Investments X 360 et X 398 pour les Request for Single Stage - One 2021-02- 2021-02- 2021-04- 2021-05- COFN / C1540 and capacity building in Post Limited 98,500.00 0.00 Canceled riziculteurs dans les CR Quotations Envelope 28 12 28 28 the selected landscapes d'Ambolomoty, de Tsararano et d'Anosinalainolona F 05-21/SAV / Acquisition d'intrants (semences pour les cultures intercalaires et Component 2: Investments Under Request for Single Stage - One 2021-09- 2021-10- 2021-11- engrais organique) au COFN / C1540 and capacity building in Post Open - National 14,000.00 0.00 Implementa Quotations Envelope 06 23 22 profit des 50 paysans the selected landscapes tion adoptant l'agroforesterie dans le paysage d'Andapa, F 04-19/BOE / Achat Component 3: Project Request for Single Stage - One 2021-04- 2021-07- 2021-08- pneus pou 2 années pour COFN / C1540 Management Coordination Post Open - National 4,000.00 0.00 Canceled Quotations Envelope 19 13 12 la CER Boeny and M&E NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned Actual MG-UGP PADAP-70332- NC-RFQ / Service de transit pour dédouanement de Component 3: Project Request for Single Stage - One 2018-07- 2018-09- 2018-07- 2018-10- matériels roulants (10 IDA / 59790 Management Coordination Post Open - National 57,000.00 34,129.26 Signed Quotations Envelope 24 04 30 04 voitures et 20 motos), et and M&E service de mise en circulation des véhicules et moto du PADAP. C 03-20/CN / Service de Component 3: Project transit et douane pour le Request for Single Stage - One 2020-03- 2020-04- 2020-05- COFN / C1540 Management Coordination Post Open - National 5,500.00 0.00 Canceled dédouanement des Quotations Envelope 08 17 17 and M&E matériels roulants du PADAP PSNC 01-21/SOFIA / Mise en œuvre des activités de reboisement à vocation bois d'œuvre et d'agroforesterie : Component 2: Investments Request for Single Stage - One 2021-04- 2021-02- 2021-05- 2021-03- 2022-02- Lot 1 : dans le Fokontany COFN / C1540 and capacity building in Post Limited 99,800.00 90,458.98 Signed Quotations Envelope 05 19 10 15 04 d'Ampandrana de la CR the selected landscapes Ambatosia Lot 2 : dans les Fokontany : Ambalabe, Ambohimitsinjo et Beanatsindra de la CR Ambatosia PSNC 01-21/BOE / Réalisation des activités de reboisement dans le Component 2: Investments Under Paysage de Marovoay 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- 2022-07- COFN / C1540 and capacity building in Post Direct Selection Direct 800,000.00 0.00 Implementa Lot 01: Essence à vocation 26 26 08 02 22 16 the selected landscapes tion énergetique Lot 02: Essence à vocation bois d'oeuvre PSNC 02-21/SOFIA / Plantation d'arbres à vocations multiples pour la protection des versants dénudés: Component 2: Investments Pending Lot 1 : dans 05 Fokontany Request for Single Stage - One 2021-04- 2021-05- 2022-02- COFN / C1540 and capacity building in Post Limited 99,150.00 0.00 Implementa de la CR Analila Quotations Envelope 05 10 04 the selected landscapes tion Lot 2 : dans 05 Fokontany de la CR Anjozoromadosy ; 1 Fokontany de la CR Ankazotokana ; dans 05 Fokontany de la CR Marotolana PSNC 03-21/SOFIA / Conduite de reboisement à vocation bois énergie et 115 Ha de plantation Component 2: Investments Request for Single Stage - One 2021-04- 2021-02- 2021-05- 2021-03- 2022-02- d'arbres fruitiers Lot 1: COFN / C1540 and capacity building in Post Limited 99,500.00 158,708.79 Signed Quotations Envelope 05 19 10 15 04 dans 04 Fokontany de la CR the selected landscapes Ambodiampana Lot 2 : dans 06 Fokontany de la CR Antsamaka Page 6 PSNC 04-21/SOFIA / Mise en œuvre de reboisement et d'embocagement pour protection et restauration Component 2: Investments Request for Single Stage - One 2021-04- 2021-02- 2021-05- 2021-03- 2022-02- des sols. Lot 1 : dans 04 COFN / C1540 and capacity building in Post Limited 99,700.00 158,708.79 Signed Quotations Envelope 05 19 10 15 04 Fokontany de la CR the selected landscapes Ambodiampana Lot 2 : dans 06 Fokontany de la CR Bealanana PSNC 06-21/SOFIA / Réalisation de reboisement pour stabilisation des Component 2: Investments Under terrains dégradés Request for Single Stage - One 2021-04- 2021-05- 2022-02- COFN / C1540 and capacity building in Post Limited 99,750.00 0.00 Implementa Lot 1 : dans 07 Fokontany Quotations Envelope 05 10 04 the selected landscapes tion de la CR Ambatoriha Est Lot 2 : dans 03 Fokontany de la CR Ambararatabe Nord PSNC 07-21/SOFIA / Protection PI via reboisement et plantation d'arbres fruitiers dans la Component 2: Investments Commune Rurale de Request for Single Stage - One 2021-04- 2021-02- 2021-05- 2021-03- 2022-02- COFN / C1540 and capacity building in Post Limited 99,600.00 143,231.68 Signed Beandrarezona Quotations Envelope 05 19 10 15 04 the selected landscapes Lot 1 : dans le Fokontany de Beandrarezona, Lot 2 : dans les 03 Fokontany : Andraratrarina, Ambodisatrana, Amberivery PSNC 05-21/SOFIA / Reboisement pour protection autour des Component 2: Investments Pending zones gérées par les COBA Request for Single Stage - One 2021-04- 2021-05- 2022-02- COFN / C1540 and capacity building in Post Limited 99,150.00 0.00 Implementa Lot 1 : dans 08 Fokontany Quotations Envelope 05 10 04 the selected landscapes tion de la CR Mangindrano Lot 2 : dans 05 Fokontany de la CR Ambovonomby PSNC 03-21/BOE / Agence de paiement des travaux de Component 2: Investments reboisement , de Request for Single Stage - One 2021-03- 2021-05- 2021-08- COFN / C1540 and capacity building in Post Limited 40,000.00 0.00 Canceled l'agroforesterie et Quotations Envelope 20 18 16 the selected landscapes l'amélioration des pâturages dans la Région Boeny PSNC 08-21/SOFIA / Agence de paiement des Component 2: Investments Request for Single Stage - One 2021-04- 2021-06- 2021-09- travaux de reboisement ,de COFN / C1540 and capacity building in Post Limited 50,000.00 0.00 Canceled Quotations Envelope 10 08 06 l'agroforesterie pour la the selected landscapes Région Sofia PSNC 01-21/SAV / Traitements et stabilisations des « points Component 2: Investments Pending noirs » (Lavaka) dans les 2021-06- 2021-07- 2021-08- 2022-02- COFN / C1540 and capacity building in Post Direct Selection Direct 42,801.00 0.00 Implementa anciennes zones 30 10 24 20 the selected landscapes tion d’exploitation minière d’Ankarierabe, Commune Rurale Bealampona, District Andapa – Région SAVA. PSNC 06-21/ANJ / Agence de paiement: -Lot 1 : Reboisement à Analabe -Lot 2: Reboisement Iazafo nord et sud Component 2: Investments Pending -Lot 3: Reboisement à Request for Single Stage - One 2021-08- 2021-10- 2022-04- COFN / C1540 and capacity building in Post Open - National 52,796.00 0.00 Implementa Soanierana ouest Quotations Envelope 09 08 26 the selected landscapes tion -Lot 4: Reboisement pour les COBA -Lot 5: Installation d’un peuplement forestier et agroforesterie -Paysage Soanierana Ivongo PSNC 05-21/ANJ / Recrutement d'agence d'encadrement d'un peuplement forestier et Component 2: Investments Pending agroforestier dans les Request for Single Stage - One 2021-09- 2021-11- 2022-12- COFN / C1540 and capacity building in Post Open - National 57,000.00 0.00 Implementa Communes de Manompana, Quotations Envelope 03 02 17 the selected landscapes tion Antanifotsy, Soanierana Ivongo, Fotsialanana et Ambinanisakana- Paysage de Soanierana Ivongo PSNC 02-21/SAV / Fourniture des jeunes plants, encadrement et Component 2: Investments Pending Request for Single Stage - One 2021-09- 2021-10- 2022-06- mise en œuvre des activités COFN / C1540 and capacity building in Post Open - National 75,000.00 0.00 Implementa Quotations Envelope 05 26 23 de reboisements à vocation the selected landscapes tion énergétique dans la zone sud du paysage d’Andapa PSNC 03-21/SAV / Conduite des activités de Component 2: Investments Pending reboisement avec Request for Single Stage - One 2021-09- 2021-10- 2022-06- COFN / C1540 and capacity building in Post Open - National 65,000.00 0.00 Implementa fourniture des jeunes Quotations Envelope 05 26 23 the selected landscapes tion plants, pour 130 ha, des bois d’énergie dans la zone nord du paysage d’Andapa PSNC 01-21/ANJ / Encadrement technique et socio-organisationnel des travaux de reboisement sur Component 2: Investments Pending une surface de 409ha au Request for Single Stage - One 2021-03- 2021-05- 2022-06- COFN / C1540 and capacity building in Post Open - National 54,422.00 0.00 Implementa niveau de 03 Fokontany Quotations Envelope 08 07 21 the selected landscapes tion dans le PAYSAGE D'IAZAFO, ZONE ANALABE, Commune Maromitety- Région Analanjirofo PSNC 04-21/ANJ / Recrutement d’une Agence d’Exécution pour Component 2: Investments Pending l’accomplissement du Request for Single Stage - One 2021-03- 2021-05- 2022-06- COFN / C1540 and capacity building in Post Open - National 50,623.00 0.00 Implementa reboisement à grande Quotations Envelope 08 07 21 the selected landscapes tion échelle au niveau des zones de transfert de gestion des COBA de la Commune Ambahoabe PSNC 03-21/ANJ / Gestion des personnels HIMO et suivi-encadrement des travaux de reboisement sur Component 2: Investments Pending une surface de 482ha au Request for Single Stage - One 2021-03- 2021-05- 2022-06- COFN / C1540 and capacity building in Post Open - National 64,106.00 0.00 Implementa niveau de 07 Fokontany Quotations Envelope 08 07 21 the selected landscapes tion dans le PAYSAGE DE SOANIERANA IVONGO, ZONE OUEST, Communes Ambahoabe et Antenina- Région Analanjirofo PSNC 02-21/ANJ / Encadrement des travaux de reboisement sur une surface de 257ha dans le Component 2: Investments Pending PAYSAGE D'IAZAFO ZONE Request for Single Stage - One 2021-02- 2021-04- 2022-09- COFN / C1540 and capacity building in Post Open - National 34,154.00 0.00 Implementa NORD ET SUD, Communes Quotations Envelope 20 26 18 the selected landscapes tion Maromitety, Ampasimazava, Antanamarina, Vavatenina, Mahanoro et Ambatoharanana- Région Analanjirofo CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Request for Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C 6-18/CN / Etude d'aménagement (APS-APD- Component 2: Investments EIES-PAR-DAO-MGE) et Quality And Cost- 2018-01- 2018-04- 2018-02- 2018-02- 2018-05- 2018-03- 2018-06- 2018-04- 2018-07- 2018-05- 2018-07- 2018-05- 2018-08- 2018-10- IDA / 59790 and capacity building in Post Open - National 62,500.00 51,882.50 Signed surveillance des travaux Based Selection 22 19 06 28 11 30 12 14 02 04 24 28 29 25 the selected landscapes dans le périmètre d'Andranomafana Mangindrano, région Sofia. C 4-18/CN / Etude de rehabilitation des infrasrtuctures Component 2: Investments Quality And Cost- 2018-01- 2018-03- 2018-02- 2018-02- 2018-05- 2018-03- 2018-06- 2018-04- 2018-07- 2018-05- 2018-07- 2018-05- 2018-09- 2018-11- hydroagricoles (APS-APD- IDA / 59790 and capacity building in Post Open - National 500,000.00 287,114.06 Signed Based Selection 22 27 06 28 10 30 12 14 02 04 27 28 03 24 EIES-PAR-DAO-MGE) et the selected landscapes surveillance des travaux dans le périmètre de Iazafo, Région Analanjirofo C 5-18/CN / Etude de reconstruction du barrage et réfection des réseaux Component 2: Investments hydroagricoles (APD-EIES- Quality And Cost- 2018-01- 2018-04- 2018-02- 2018-02- 2018-05- 2018-03- 2018-06- 2018-04- 2018-07- 2018-05- 2018-07- 2018-05- 2018-08- 2018-10- IDA / 59790 and capacity building in Post Open - National 87,500.00 23,197.46 Signed PAR-DAO-MGE) et Based Selection 22 19 06 28 10 30 12 14 13 04 24 28 31 25 the selected landscapes surveillance des travaux dans le périmètre d'Anjohibe Ambatosia, Région Sofia. C 7-18/CN / Etude de réhabilitation de périmètre Component 2: Investments irrigué (APD-EIES-PAR-DAO- Quality And Cost- 2018-01- 2018-04- 2018-02- 2018-02- 2018-05- 2018-03- 2018-06- 2018-04- 2018-07- 2018-05- 2018-07- 2018-05- 2018-09- 2018-11- IDA / 59790 and capacity building in Post Open - National 125,000.00 29,974.84 Signed MGE) et surveillance des Based Selection 22 19 06 28 10 30 12 14 13 04 24 28 10 24 the selected landscapes travaux dans le périmètre de Bealanana I, région Sofia. C 8-18/CN / Etude d'aménagement (APS-APD- Component 2: Investments EIES-PAR-DAO-MGE) pour Quality And Cost- 2018-01- 2018-02- 2018-02- 2018-03- 2018-04- 2018-05- 2018-05- 2018-11- IDA / 59790 and capacity building in Post Open - National 54,000.00 0.00 Canceled la stabilisation des terrasse Based Selection 22 06 28 30 14 04 28 24 the selected landscapes à Bealanana et surveillance des travaux. Component 3: Project C 03-18/CN / Un cabinet Least Cost 2018-01- 2018-01- 2018-01- 2018-02- 2018-04- 2018-03- 2018-05- 2018-03- 2018-05- 2018-04- 2018-05- 2018-04- 2018-05- 2018-07- IDA / 59790 Management Coordination Post Open - National 30,000.00 8,305.01 Signed d'audit financier du PADAP. Selection 15 23 31 17 17 19 17 29 18 09 25 29 28 28 and M&E C 04-17/CN / Études préparatoires du Projet Agriculture Durable par une Approche Paysage (PADAP) Component 1: Information Quality And Cost- 2018-01- 2017-06- 2018-02- 2018-03- 2017-09- 2018-04- 2017-10- 2018-05- 2017-11- 2018-05- 2018-02- 2018-06- 2018-02- 2018-09- Périmètre d'Iazafo dans le IDA / V0430 Post Open - National 200,000.00 224,827.15 Signed and planning Based Selection 24 28 14 30 28 27 30 07 08 21 02 14 05 12 district de Vavatenina et dans le district de Soanierana Ivongo, région ANALANJIROFO. C 02-17/CN / Études préparatoires du Projet Agriculture Durable par une Component 1: Information Quality And Cost- 2018-01- 2017-06- 2018-02- 2018-03- 2017-09- 2018-04- 2017-10- 2018-05- 2017-11- 2018-05- 2017-12- 2018-06- 2018-02- 2018-09- IDA / V0430 Post Open - National 150,000.00 156,130.05 Signed Approche Paysage (PADAP) and planning Based Selection 24 28 14 30 28 27 30 07 08 21 07 14 09 12 dans le district de Marovoay, région BOENY C 01-17/CN / Études préparatoires du Projet Agriculture Durable par une Component 1: Information Quality And Cost- 2018-01- 2017-06- 2018-02- 2018-03- 2017-09- 2018-04- 2017-10- 2018-05- 2017-11- 2018-05- 2018-02- 2018-06- 2018-03- 2018-09- IDA / V0430 Post Open - National 150,000.00 234,393.50 Signed Approche Paysage (PADAP) and planning Based Selection 24 28 14 30 28 27 30 07 08 21 06 14 05 12 dans le district d'Andapa, région SAVA C 01-18/CN / Développement d'un guide Component 1: Information Quality Based Open - 2018-04- 2018-05- 2018-05- 2018-05- 2018-07- 2018-08- 2018-08- 2018-09- 2018-09- 2018-12- IDA / 59790 Post 100,000.00 0.00 Canceled pour l'élaboration des and planning Selection International 30 03 10 15 13 12 22 06 30 29 PAGDP (Firme international) C 18-18/CN / Service de consultant pour Component 2: Investments Quality And Cost- 2018-05- 2018-09- 2018-05- 2018-06- 2019-12- 2018-07- 2020-01- 2018-07- 2020-01- 2018-09- 2020-02- 2018-09- 2020-04- 2019-04- l'encadrement, formation et IDA / 59790 and capacity building in Post Open - National 50,000.00 22,725.03 Terminated Based Selection 09 18 30 19 02 19 03 29 20 02 04 26 01 24 suivi des agents the selected landscapes communaux pour l'approche LIFE C 24-18/CN / Etude de traitement des points critiques de la RN31 route Component 2: Investments Quality And Cost- Under 2018-05- 2018-11- 2018-06- 2018-06- 2018-12- 2018-07- 2019-01- 2018-08- 2019-02- 2018-09- 2019-02- 2018-10- 2019-03- 2019-08- non revêtue reliant IDA / 59790 and capacity building in Post Open - National 400,000.00 124,815.95 Based Selection Implementation 14 06 04 28 27 28 28 17 15 21 25 26 01 22 Bealanana-Ambatoriha the selected landscapes d'une longueur de 32 km - Contrôle et surveillance Page 7 C 12-18/CN / Etude et Component 3: Project contrôle-surveillance sur Quality And Cost- 2018-05- 2018-09- 2018-06- 2018-06- 2018-10- 2018-07- 2018-12- 2018-08- 2019-02- 2018-09- 2019-02- 2018-10- 2019-02- 2019-02- IDA / 59790 Management Coordination Post Open - National 21,000.00 24,935.50 Signed Les travaux d'extension et Based Selection 14 24 04 28 30 28 03 07 12 11 15 16 25 13 and M&E de Réhabilitation locaux Sofia C 15-18/CN / Etude et Component 3: Project contrôle-surveillance sur Quality And Cost- 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-10- 2018-10- 2018-11- 2019-02- IDA / 59790 Management Coordination Post Open - National 10,500.00 3,669.43 Signed Les travaux d'extension et Based Selection 14 14 04 28 15 28 16 07 31 11 04 16 14 13 and M&E de Réhabilitation locaux Sava C 37-18/CN / Inventaire : surfaces pâturables, espèces fourragères naturelles, points d'abreuvement, Component 1: Information Quality And Cost- Under 2018-07- 2018-09- 2018-08- 2018-08- 2018-11- 2018-09- 2018-09- 2018-10- 2018-12- 2019-04- IDA / 59790 Post Open - National 125,000.00 0.00 infrastructures d'élevage and planning Based Selection Implementation 12 05 02 16 26 15 25 30 04 03 existantes dans la zone. Lot 01 : de Bealanana. Lot 02 : d'Andapa. Lot 03 : de Marovoay Lot 04 : d'Iazafo C 01BIS-18/CN / Consultant Développement d'un guide Component 1: Information Open - 2018-05- 2018-05- 2018-07- 2018-08- 2018-08- 2018-11- IDA / 59790 Post Qualification 100,000.00 0.00 Canceled pour l'élaboration des and planning International 03 24 07 06 30 28 Selection PAGDP (Firme international) C 41-18/CN / Inventaire des périmètres Component 1: Information Quality And Cost- 2018-08- 2018-09- 2018-10- 2018-11- 2018-11- 2018-12- 2019-01- 2018-12- 2019-02- 2019-01- 2019-03- 2019-02- 2020-04- 2019-06- 2020-10- hydroagricoles repartis en IDA / 59790 Post Open - National 230,000.00 155,001.04 Signed and planning Based Selection 30 04 14 17 21 17 04 27 01 20 14 24 15 24 15 quatre (04) lots pour les régions : Sava, Boeny, Sofia et Analanjirofo. C 01-18/BOE / Recrutement d'une ONG chargée du renforcement Component 2: Investments de capacités et de l'appui Quality And Cost- 2018-11- 2018-11- 2018-12- 2019-01- 2018-12- 2019-02- 2019-03- 2019-04- 2019-05- 2019-08- IDA / 59790 and capacity building in Post Open - National 23,500.00 0.00 Canceled des paysans pilotes sur les Based Selection 20 14 11 24 03 23 05 09 14 12 the selected landscapes paquets techniques de la production fourragère, agroécologie, agroforesterie et arboriculture C 02-18/BOE / Recrutement d'une ONG ou Component 2: Investments Association chargée du Quality And Cost- 2018-11- 2018-12- 2018-12- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-08- 2019-10- IDA / 59790 and capacity building in Post Open - National 5,200.00 5,702.82 Completed diagnostic et Based Selection 20 05 11 24 06 23 07 05 20 09 12 14 07 12 15 the selected landscapes redynamisation des 03 Coopératives de producteurs de semences à Tsararano C 05-18/BOE / Etude spécifique de protection Component 2: Investments Quality And Cost- 2018-11- 2019-07- 2018-12- 2018-12- 2020-01- 2019-01- 2020-02- 2019-02- 2020-05- 2019-03- 2020-05- 2019-03- 2020-07- 2019-04- des lavaka au niveau des IDA / 59790 and capacity building in Post Open - National 47,000.00 77,973.66 Signed Based Selection 20 08 05 27 28 26 12 10 04 02 19 26 27 25 SBV Ambarindahy, the selected landscapes Androtra, Belafrika C 1-18/SAV / Amélioration de la Component 2: Investments Quality And Cost- 2018-11- 2019-01- 2018-12- 2019-02- 2019-03- 2019-03- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-05- 2019-06- 2019-07- 2019-10- disponibilité de semences IDA / 59790 and capacity building in Post Open - National 7,910.00 15,635.97 Completed Based Selection 30 07 21 03 26 05 25 15 30 19 14 24 21 08 29 améliorées et certifiées the selected landscapes dans le paysage d'Andapa C 5-18/ANJ / Etude de rehabilitation des infrasrtuctures Component 2: Investments hydroagricoles (APS-APD- Quality And Cost- 2018-11- 2019-01- 2018-12- 2019-01- 2019-01- 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2020-08- IDA / 59790 and capacity building in Post Open - National 79,200.00 46,026.84 Signed EIES-PAR-DAO-MGE) et Based Selection 30 10 15 06 24 05 25 20 01 12 13 05 27 17 the selected landscapes surveillance des travaux des périmètres Marovinanto et Sahafary dans le paysage Soanierana Ivongo. C 02-18/SAV / Amélioration de la Component 2: Investments Quality And Cost- 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-07- disponibilité de semences IDA / 59790 and capacity building in Post Open - National 7,910.00 0.00 Canceled Based Selection 20 11 24 23 10 14 19 03 améliorées et certifiées the selected landscapes dans le paysage d'Andapa C 01-19/SAV / Études de réhabilitation du barrage souple avec avant canal rive droite et réfection des Component 2: Investments réseaux hydroagricoles, Quality And Cost- 2019-01- 2018-12- 2019-02- 2019-03- 2019-01- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2020-12- IDA / 59790 and capacity building in Post Open - National 45,500.00 67,478.28 Signed digue de protection et Based Selection 30 11 14 02 31 01 04 15 09 27 17 17 17 12 the selected landscapes pistes (APS-APD-EIES-PAR- DAO-MGE) et contrôle - surveillance du périmètre Ambalafary sur 203 ha et Analambe Est C 02-19/SAV / Études de réhabilitation du barrage en dur avec avant canal rive droite et renovation des réseaux hydroagricoles et Component 2: Investments Quality And Cost- 2019-01- 2019-01- 2019-02- 2019-03- 2019-01- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-05- 2019-05- 2019-05- 2020-12- pistes (APS-APD-EIES-PAR- IDA / 59790 and capacity building in Post Open - National 72,220.00 37,620.86 Signed Based Selection 30 18 14 02 31 01 04 15 09 27 02 17 17 12 DAO-MGE) et contrôle - the selected landscapes surveillance du périmètre Ambodivitagnona sur 310ha, CR Ambalamanasy II, district d'Andap C 04-19/SAV / Études de réhabilitation d'un barrage avec avant canal rive gauche et de réfection des Component 2: Investments réseaux hydroagricoles et Quality And Cost- 2019-01- 2019-01- 2019-02- 2019-03- 2019-01- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-05- 2019-05- 2019-05- 2020-12- IDA / 59790 and capacity building in Post Open - National 63,500.00 64,941.59 Signed les ouvrages connexes du Based Selection 30 25 14 02 31 01 04 15 09 27 03 17 17 12 the selected landscapes grappe (APS-APD-EIES-PAR- DAO-MGE) et contrôle - surveillance du Périmètre Antanimbaribe et périmètre d'Ambatoharanan C 05-19/SAV / Études de réhabilitation du barrage en dur avec avant canal rive droite et réfection des Component 2: Investments réseaux hydroagricoles Quality And Cost- 2019-01- 2019-01- 2019-02- 2019-03- 2019-01- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-05- 2019-05- 2019-05- 2020-12- IDA / 59790 and capacity building in Post Open - National 94,470.00 45,623.17 Signed (APS-APD-EIES-PAR-DAO- Based Selection 30 25 14 02 31 01 04 15 09 27 03 17 17 12 the selected landscapes MGE) et contrôle - surveillance du périmètre Tanandava sur 399ha CR Tanandava, district d'Andapa C 08-19/SAV / Etude technique et maitrise d'œuvre de traitements et Component 2: Investments stabilisation des « lavaka » Quality And Cost- 2019-02- 2019-11- 2019-03- 2019-04- 2019-12- 2019-05- 2020-01- 2019-05- 2020-03- 2019-06- 2020-05- 2019-07- 2020-06- 2020-02- IDA / 59790 and capacity building in Post Open - National 16,510.00 23,156.10 Signed dans les anciennes zones Based Selection 11 04 13 06 12 06 13 26 05 19 07 09 19 04 the selected landscapes d'exploitation minières à Ankarierabe, Commune Rurale Bealampona, District d'Andapa C 06-19/SAV / Création et mise en place des huit (08) Component 2: Investments Quality And Cost- 2019-02- 2019-09- 2019-03- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- 2019-09- 2019-07- 2019-10- 2020-07- nouveaux AUE sur les IDA / 59790 and capacity building in Post Open - National 40,500.00 13,786.27 Signed Based Selection 12 13 14 07 29 07 28 27 17 20 16 10 02 04 périmètres nouvellement à the selected landscapes réhabiliter C 03-19/ANJ / Etude de rehabilitation des infrasrtuctures hydroagricoles (APS-APD- Component 2: Investments Quality And Cost- 2019-02- 2019-02- 2019-03- 2019-04- 2019-02- 2019-05- 2019-03- 2019-05- 2019-03- 2019-06- 2019-03- 2019-07- 2019-04- 2021-02- 2019-04- EIES-PAR-DAO-MGE) et IDA / 59790 and capacity building in Post Open - National 207,200.00 52,228.62 Completed Based Selection 20 08 22 13 14 13 18 28 22 17 28 11 23 20 24 Contrôle-surveillance des the selected landscapes travaux dans les périmètres de Vohijiny et Ampasimbola-District de Soanierana Ivongo C 04-19/ANJ / Recrutement de firme pour la capitalisation des acquis Component 2: Investments sur les paquets techniques Quality And Cost- 2019-02- 2019-02- 2019-03- 2019-04- 2019-06- 2019-05- 2019-07- 2019-05- 2019-08- 2019-06- 2019-08- 2019-07- 2019-09- 2022-10- IDA / 59790 and capacity building in Post Open - National 55,500.00 65,328.45 Signed agroécologique, Based Selection 20 08 22 13 06 13 08 28 13 17 23 11 18 23 the selected landscapes agroforesterie, arbiriculture et culture fourragère dans les paysages d'Iazafo et Soanierana Ivongo C 01-19/BOE / Component 2: Investments Recrutement d'une ONG Quality And Cost- Under 2019-02- 2019-02- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-07- 2019-06- 2019-07- 2019-10- COFN / C1540 and capacity building in Post Open - National 16,090.00 11,039.03 chargée des études de Based Selection Implementation 24 18 26 19 26 19 28 03 12 02 18 27 10 the selected landscapes diagnostic des AUE dans les secteurs 04, 05 et 06 C 02-19/BOE / Recrutement d'une ONG chargée de l'étude de Component 2: Investments Quality And Cost- 2019-02- 2019-02- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-06- 2019-07- 2019-06- 2019-10- stabilisation des zones COFN / C1540 and capacity building in Post Open - National 10,000.00 7,934.21 Signed Based Selection 24 18 26 17 15 17 14 01 29 21 06 15 21 23 d'érosion et protection des the selected landscapes réseaux hydroagricoles le long du CPRD et CSPC Ambolomoty (ONG) C 03-19/BOE / Etudes, contrôle et surveillance des Component 2: Investments Quality And Cost- 2019-02- 2018-12- 2019-03- 2019-04- 2019-02- 2019-05- 2019-03- 2019-06- 2019-04- 2019-06- 2019-04- 2019-07- 2019-05- 2021-01- travaux de curage du drain COFN / C1540 and capacity building in Post Open - National 26,000.00 20,616.05 Signed Based Selection 24 18 26 17 19 17 19 01 12 21 24 15 08 25 de ceinture et reprofilage the selected landscapes du drain naturel Manompo C 04-19/BOE / Etudes des Component 2: Investments travaux de reprofilage des Quality And Cost- 2019-02- 2019-03- 2019-03- 2019-04- 2019-02- 2019-05- 2019-04- 2019-06- 2019-04- 2019-06- 2019-04- 2019-07- 2019-06- 2021-01- COFN / C1540 and capacity building in Post Open - National 52,500.00 69,283.53 Signed réseaux de drainage des Based Selection 24 03 26 17 28 17 01 01 09 21 30 15 06 25 the selected landscapes secteurs 04, 05 et 06 C 16-18/CN / Analyse des problématiques d'entretien Consultant Component 1: Information 2018-06- 2018-10- 2018-08- 2018-09- 2018-11- 2018-10- 2018-11- 2019-02- des ouvrages IDA / 59790 Post Qualification Open - National 30,000.00 0.00 Canceled and planning 28 08 07 10 30 20 13 21 hydroagricoles, proposition Selection d'instruments et stratégies C 01-19/CN / Élaboration du Plans d'Aménagement et de Gestion Durable des Paysages (PAGDP) du PADAP pour le : Component 1: Information Quality And Cost- Open - 2019-03- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-07- 2019-08- 2019-07- 2019-08- 2019-08- 2019-10- 2019-09- 2020-02- COFN / C1540 Post 967,463.00 1,014,833.73 Signed Lot 01 : Paysage d'Andapa and planning Based Selection International 29 01 13 02 25 17 08 01 19 31 16 01 25 28 Lot 02 : Paysage de Bealalana Lot 03 : Paysage de Marovoay Lot 04 : Paysage d'Iazafo Lot 05 : Paysage de C 29-18/CN Soanierana / Ivongo Développement d'une Component 1: Information Quality And Cost- 2018-08- 2018-09- 2018-10- 2018-11- 2018-12- 2018-12- 2019-01- 2019-02- 2019-06- méthodologie d'inventaire IDA / 59790 Post Open - National 25,000.00 0.00 Canceled and planning Based Selection 30 26 14 17 17 27 20 24 24 des ressources en eau et estimation des besoins C 04 BIS-18/BOE / Etudes et contrôle-surveillance des travaux de regabaritage Component 2: Investments Quality And Cost- 2018-11- 2019-03- 2018-12- 2019-02- 2018-12- 2019-03- 2019-01- 2019-04- 2019-02- 2019-05- 2019-02- 2019-06- 2019-03- 2020-06- des cours d'eau exutoire du COFN / C1540 and capacity building in Post Open - National 145,000.00 90,071.60 Signed Based Selection 21 03 21 03 07 05 07 04 20 09 25 13 22 12 drainage de périmètre the selected landscapes irrigué des secteurs 4, 5 et 6 de la plaine de Marovoay. C 04-18/BOE / Etudes de Réhabilitation des cours Component 2: Investments Quality And Cost- 2018-11- 2018-11- 2018-12- 2019-01- 2019-02- 2019-02- 2019-03- 2019-04- 2019-12- d'eau exutoire du drainage IDA / 59790 and capacity building in Post Open - National 62,500.00 0.00 Canceled Based Selection 20 21 11 04 03 13 20 24 10 (Rivière Marovoay Aval, the selected landscapes Rivière Karambo Aval) MG-UGP PADAP-117841- CS-QCBS / Agence de Component 3: Project communication pour la Quality And Cost- 2019-06- 2019-04- 2019-07- 2019-08- 2019-05- 2019-09- 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2020-01- COFN / C1540 Management Coordination Post Open - National 28,500.00 20,587.41 Signed création, animation et Based Selection 17 10 08 21 23 20 02 10 06 03 03 27 27 26 and M&E l'hébergement du site web du PADAP. MG-UGP PADAP-118799- CS-LCS / Recrutement d'un Component 3: Project Least Cost 2019-06- 2019-06- 2019-06- 2019-06- 2019-08- 2019-07- 2019-09- 2019-08- 2019-10- 2019-08- 2019-10- 2019-10- 2019-12- 2020-01- cabinet pour l'audit externe COFN / C1540 Management Coordination Post Open - National 75,000.00 17,544.75 Signed Selection 20 27 20 22 29 22 30 06 04 21 21 04 27 02 des trois (03) exercices du and M&E PADAP : 2019, 2020 et 2021. C 01 BIS-18/BOE / Recrutement d'une ONG chargée du renforcement de capacités et de l'appui Component 2: Investments Quality And Cost- 2018-11- 2018-10- 2018-12- 2019-01- 2018-12- 2019-02- 2019-01- 2019-03- 2019-01- 2019-04- 2019-01- 2019-05- 2019-02- 2020-05- des paysans pilotes sur les COFN / C1540 and capacity building in Post Open - National 70,500.00 49,883.77 Signed Based Selection 14 08 05 18 03 15 03 17 24 21 31 26 11 25 paquets techniques de la the selected landscapes production fourragère, agroécologie, agroforesterie et arboriculture Page 8 C 03-19/SAV / Etudes APS- APD-EIES-PAR-MGE-DAO- assistance passation de marché et contrôle- surveillance des travaux Component 2: Investments Quality And Cost- 2019-01- 2019-01- 2019-02- 2019-03- 2019-01- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2020-12- reconstruction des deux IDA / 59790 and capacity building in Post Open - National 47,000.00 46,114.62 Signed Based Selection 30 25 14 02 31 01 04 15 09 27 19 17 17 12 barrages avec avant- the selected landscapes canaux rive gauche & droite et des réseaux hydroagricoles d'Antsahameloka pour les PI Ambodiala et Andalamena. C 16 BIS-18/CN / Analyse des problématiques Component 2: Investments d’entretien des ouvrages Quality And Cost- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-08- COFN / C1540 and capacity building in Post Open - National 30,000.00 0.00 Canceled hydroagricoles à Based Selection 08 07 21 20 19 26 30 08 the selected landscapes Madagascar, proposition d’instrument et stratégies C 07-19/SAV / Mise en place des douze (12) Component 2: Investments pépinières communautaires Quality And Cost- 2019-02- 2019-04- 2019-03- 2019-04- 2019-05- 2019-06- 2019-06- 2019-07- 2020-03- IDA / 59790 and capacity building in Post Open - National 37,490.00 0.00 Canceled au niveau des villages et Based Selection 20 12 22 15 15 04 28 18 14 the selected landscapes des COBAS autour des aires protegées de la cuvette d'Andapa C 07-20/SOF / Contrôle et Surveillance des Travaux de Component 2: Investments Quality And Cost- 2020-02- 2020-04- 2020-03- 2020-04- 2020-04- 2020-05- 2020-06- 2020-06- 2020-07- 2020-06- 2020-08- 2020-07- 2020-09- 2020-08- réhabilitation du Périmètre COFN / C1540 and capacity building in Post Open - National 24,000.00 13,580.72 Signed Based Selection 28 02 09 02 30 02 02 01 21 26 01 21 10 05 d'Anjohibe Ambatosia dans the selected landscapes le Paysage de Bealanana C 02-20/SAV / Etude de faisabilité, mise en place et opérationnalisation des Component 2: Investments Quality And Cost- 2020-02- 2020-05- 2020-03- 2020-04- 2020-09- 2020-05- 2020-10- 2020-06- 2020-11- 2020-07- 2020-12- 2020-08- 2020-12- 2020-10- comités de gestion des COFN / C1540 and capacity building in Post Open - National 10,500.00 10,290.96 Signed Based Selection 28 29 13 26 15 26 19 15 23 19 11 23 23 22 matériels agricoles dans le the selected landscapes paysage d'Andapa, Région SAVA. C 04-19/SOF / Études, contrôle et surveillance de Component 2: Investments Quality And Cost- 2020-02- 2019-10- 2020-03- 2020-04- 2019-10- 2020-05- 2019-11- 2020-05- 2020-01- 2020-06- 2020-02- 2020-07- 2020-03- 2020-12- travaux d'aménagement du COFN / C1540 and capacity building in Post Open - National 41,000.00 18,719.00 Signed Based Selection 20 04 01 05 04 05 06 25 23 24 28 24 18 21 périmètre de the selected landscapes Doany,Paysage de Bealanana T 1-18/SOF / Travaux de stabilisation biologique des Component 1: Information Quality And Cost- 2018-11- 2018-12- 2019-01- 2019-02- 2019-02- 2019-03- 2019-04- 2019-05- lavaka avec mise en place IDA / 59790 Post Open - National 9,800.00 0.00 Canceled and planning Based Selection 30 15 06 05 20 12 05 05 de fascines dans le sous paysage d'Ambatoriha MG-UGP PADAP-118793- CS-QCBS / Inventaire forestier et écologique : - Lot 01: dans le paysage d'Andapa Component 1: Information Quality And Cost- 2019-06- 2019-07- 2019-08- 2019-09- 2019-09- 2019-10- 2019-11- 2020-03- - Lot 02 : dans le paysage COFN / C1540 Post Open - National 365,000.00 0.00 Canceled and planning Based Selection 12 12 11 10 25 15 20 19 de Bealalana - Lot 03 : dans le paysage de Marovoay - Lot 04 : dans le paysage Sonierana Ivongo et Iazafo MG-UGP PADAP-117852- CS-QCBS / Un cabinet Component 3: Project spécialisé en Quality And Cost- 2019-06- 2019-06- 2019-07- 2019-08- 2019-09- 2019-09- 2019-10- 2019-12- COFN / C1540 Management Coordination Post Open - National 22,900.00 0.00 Canceled communication en vue de Based Selection 03 24 18 17 06 30 24 23 and M&E la réalisation du film documentaire sur le PADAP et le PAGDP. C 09-18/ANJ / Recrutement d'agence d'encadrement pour la Component 2: Investments communauté locale faisant Quality And Cost- 2019-10- 2019-11- 2019-12- 2020-01- 2020-01- 2020-04- 2020-05- 2022-05- COFN / C1540 and capacity building in Post Open - National 85,000.00 0.00 Canceled la création pépinière et la Based Selection 16 15 07 06 21 01 08 08 the selected landscapes Plantation d'espèces pérennes par les agro forêts et les espèces forestières à Iazafo et Soanierana Ivongo. C 06-19/ANJ / Mise en place/Actualisation de base Component 2: Investments des données sur les Quality And Cost- 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2019-08- 2019-09- 2019-12- IDA / 59790 and capacity building in Post Open - National 37,500.00 0.00 Canceled référentiels technico Based Selection 30 30 21 21 05 25 18 27 the selected landscapes financiers des filières porteuses régionales C 02-19/ANJ / Formation de tous les membres des Component 2: Investments Quality And Cost- 2019-05- 2019-09- 2019-06- 2019-07- 2019-08- 2019-09- 2019-10- 2019-10- 2020-01- AUEs sur la gestion des IDA / 59790 and capacity building in Post Open - National 56,100.00 0.00 Canceled Based Selection 31 02 30 24 23 07 06 31 29 réseaux transférables the selected landscapes (Entretien/Maintenance) C 03-20/BOE / Diagnostic des banques de semences communautaires à Component 2: Investments Madagascar et Quality And Cost- 2020-05- 2020-02- 2020-06- 2020-08- 2020-05- 2020-08- 2020-06- 2020-09- 2020-06- 2020-10- 2020-08- 2020-11- 2020-09- 2021-08- COFN / C1540 and capacity building in Post Open - National 20,000.00 11,848.65 Signed redynamisation de la Based Selection 26 10 10 01 15 31 15 20 30 20 18 23 17 23 the selected landscapes banque de semence communautaire à Tsararano, district de Marovoay, Région Boeny C 03-19/SOF / Etudes et contrôle et surveillance de Component 2: Investments Quality And Cost- 2021-02- 2021-03- 2021-04- 2021-05- 2021-06- 2021-06- 2021-07- 2022-11- travaux de construction du COFN / C1540 and capacity building in Post Open - National 27,810.00 0.00 Canceled Based Selection 25 27 18 18 02 22 16 18 centre de multiplication de the selected landscapes semences à Betainkankana C 08-20/SOF / étude de faisabilité de la réouverture Component 2: Investments du centre de sélection Quality And Cost- 2020-02- 2020-03- 2020-05- 2020-06- 2020-06- 2020-07- 2020-08- 2020-11- COFN / C1540 and capacity building in Post Open - National 52,000.00 0.00 Canceled variétale et de Based Selection 28 29 08 07 22 12 06 04 the selected landscapes multiplication de semences Betaikankana dans le Paysage de Bealanana C 01-19/ANJ / Élaboration Component 2: Investments d'un cadre incitatif (contrat Quality And Cost- Under 2020-08- 2020-09- 2020-09- 2020-10- 2020-11- 2020-11- 2020-12- 2021-01- 2021-04- IDA / 59790 and capacity building in Post Open - National 82,820.00 0.00 plan pluriannuel) par AUE Based Selection Implementation 19 02 18 12 11 26 25 19 19 the selected landscapes Iazafo et Soanierana Ivongo. C 02-20/CN / Service de consultant pour le Component 3: Project développement d'un Quality And Cost- Under 2020-07- 2020-08- 2020-08- 2020-10- 2020-11- 2020-11- 2020-12- 2021-01- 2022-01- COFN / C1540 Management Coordination Post Open - National 25,000.00 0.00 logiciel pour le suivi- Based Selection Implementation 30 28 20 03 02 22 16 09 04 and M&E évaluation du Projet Agriculture Durable par une Approche Paysage C 30-20/SOF / Recrutement d'un Bureau Component 2: Investments d'études pour la réalisation Quality And Cost- Under 2020-09- 2020-11- 2020-10- 2020-12- 2020-11- 2021-01- 2021-01- 2021-01- 2021-03- 2021-04- 2022-04- COFN / C1540 and capacity building in Post Open - National 66,500.00 0.00 d'études, contrôle et Based Selection Implementation 30 25 21 04 30 01 20 31 07 11 11 the selected landscapes surveillance des travaux des travaux d'aménagement PI Beandrarezona (567 ha) C 05/19/SOF / Etudes et Component 2: Investments contrôle et surveillance de Quality And Cost- 2019-05- 2019-07- 2019-06- 2019-07- 2019-10- 2019-08- 2020-01- 2019-09- 2020-02- 2019-09- 2020-06- 2019-10- 2019-12- COFN / C1540 and capacity building in Post Open - National 58,590.00 0.00 Canceled travaux de stabilisation de Based Selection 30 08 29 21 21 20 22 04 21 24 02 18 17 the selected landscapes lavaka à Bealanana C 01-20/SAV / Elaboration contrat plan pluriannuel et Component 2: Investments Accompagnement Quality And Cost- 2020-08- 2020-08- 2020-09- 2020-10- 2020-10- 2020-11- 2020-12- 2022-06- COFN / C1540 and capacity building in Post Open - National 29,690.00 0.00 Canceled (Encadrement et Suivi) des Based Selection 31 31 10 11 21 25 30 23 the selected landscapes AUEs sur la mise en œuvre des Contrat Plan C 02-20/ANJ / Etudes et Contrôle-Surveillance des travaux de réhabilitation des périmètres dans le Component 2: Investments Quality And Cost- Under 2020-09- 2020-11- 2020-10- 2020-12- 2021-01- 2021-01- 2021-02- 2021-04- 2022-04- district de Soanierana COFN / C1540 and capacity building in Post Open - National 91,000.00 0.00 Based Selection Implementation 30 25 30 03 02 22 26 02 02 Ivongo the selected landscapes - Lot 01: PI d'Antanetilava et Vohilava - Lot 02: PI de Diavolamaso, Ambodiboanara et Sahondrana C 06-20/SOF / Etude, Contrôle et surveillance des Component 2: Investments travaux de réhabilitation Quality And Cost- 2020-08- 2020-09- 2020-11- 2020-12- 2020-12- 2021-01- 2021-02- 2021-06- COFN / C1540 and capacity building in Post Open - National 187,500.00 0.00 Canceled (APD-EIES-PAR-DAO-MGE) Based Selection 31 30 04 04 24 18 23 23 the selected landscapes du Périmètre de Beandrarezona dans le paysage de Bealanana C 04-20/BOE / Component 2: Investments Recrutement d'une firme Quality And Cost- 2020-09- 2020-10- 2020-11- 2020-12- 2020-12- 2021-01- 2021-02- 2022-02- COFN / C1540 and capacity building in Post Open - National 125,000.00 0.00 Canceled pour l'appui, encadrement Based Selection 18 03 08 09 29 31 25 25 the selected landscapes et réalisation des actions de reboisement C 04-20/SAV / Etude, contrôle et surveillance des travaux de réhabilitation : Lot 1 : Périmètre irrigué Ankaibe Component 2: Investments Quality And Cost- 2020-11- 2020-11- 2020-12- 2021-02- 2020-12- 2021-03- 2021-01- 2021-03- 2021-02- 2021-04- 2021-04- 2021-06- 2021-04- 2022-06- Lot 2 : Périmètre Andasibe COFN / C1540 and capacity building in Post Open - National 481,350.00 297,378.67 Signed Based Selection 30 25 21 03 21 05 20 25 26 29 01 03 30 03 Mahaverika , Ambodipont, the selected landscapes Antsahanibalana Lot 3 : Périmètre Ambodirafia I, Ambodirafia II, Antsahabe, Ambavala, Andasibe kobahina C 1-20/CN / Service de consultant pour l'évaluation Component 3: Project Consultant 2020-11- 2020-10- 2020-12- 2021-01- 2020-10- 2021-02- 2020-11- 2021-04- 2021-02- 2021-09- à mi-parcours du Projet COFN / C1540 Management Coordination Post Qualification Open - National 18,750.00 54,171.09 Signed 23 16 14 27 26 26 30 02 02 29 Agriculture Durable par une and M&E Selection Approche Paysage C 14-20/SOF / Études, contrôle et surveillance des travaux de réhabilitation: Lot 01: Périmètre Irrigué Sahatsara Ambalamanga Component 2: Investments Quality And Cost- Under 2020-12- 2020-12- 2021-01- 2021-02- 2020-12- 2021-03- 2021-01- 2021-03- 2021-02- 2021-04- 2021-04- 2022-04- Lot 02: Périmètre Irrigué COFN / C1540 and capacity building in Post Open - National 375,000.00 0.00 Based Selection Implementation 28 18 17 13 21 15 20 15 12 01 21 21 Sahatsara Ouest the selected landscapes Lot 03 : Périmètre Irrigué Ambovonomby Lot 04: Périmètre Irrigué Manakana-Antelopolo. C 09-20/SAV / Etudes, contrôle- surveillance des travaux de réhabilitation des pistes: Lot 1: axe Matsobe Component 2: Investments Andranomena Quality And Cost- 2020-12- 2020-12- 2021-01- 2021-02- 2020-12- 2021-03- 2021-02- 2021-03- 2021-02- 2021-05- 2021-04- 2021-06- 2021-04- 2021-09- COFN / C1540 and capacity building in Post Open - National 161,130.00 18,278,095.89 Signed Ambalamanasy II de 25 km Based Selection 21 23 11 09 31 11 02 31 26 05 02 09 29 27 the selected landscapes et réhabilitation de 8 Ponts Lot 2: axe Belaoko, Anjavibe, Ambodirafia, Antanimbaribe Ambalamanasy, Ambavala, Ambodivohitra C 09-20/BOE / ETUDES APS-APD-EIES-PAR- MGE- DAO-ASSISTANCE A LA PASSATION DE MARCHE ET Component 2: Investments CONTROLE-SURVEILLANCE Quality And Cost- 2020-12- 2021-02- 2020-12- 2021-02- 2020-12- 2021-03- 2021-01- 2021-04- 2021-01- 2021-05- 2021-02- 2021-06- 2021-03- 2022-03- COFN / C1540 and capacity building in Post Open - National 150,000.00 186,693.24 Signed DES TRAVAUX DE Based Selection 08 04 29 11 23 11 22 10 12 15 24 19 23 01 the selected landscapes REVETEMENT EN BETON ARME DES CANAUX PRINCIPAUX (CPRD ET CPRG) DES PERIMETRES IRRIGUES SECTEURS 04, 05 ET 06 C 01-20/CN / Service de consultant pour l'évaluation Component 3: Project Quality And Cost- 2020-02- 2020-10- 2020-03- 2020-04- 2020-05- 2020-06- 2020-06- 2020-07- 2020-10- à mi-parcours du Projet COFN / C1540 Management Coordination Post Open - National 18,750.00 0.00 Canceled Based Selection 28 16 29 20 20 04 24 18 16 Agriculture Durable par une and M&E Approche Paysage C 05-20/SOF / Etudes, mise en place et accompagnement d’une Component 2: Investments Quality And Cost- Under 2021-03- 2021-02- 2021-03- 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-12- Structure de gestion COFN / C1540 and capacity building in Post Open - National 245,000.00 0.00 Based Selection Implementation 01 11 16 30 30 29 19 13 11 adaptée pour l’axe routier the selected landscapes Bealanana – Ambatoriha (RIP 117) dans le district de Bealanana, région Sofia Page 9 C 09-20/SOF / Recrutement d'une ONG ou Association pour l'Instauration et Component 2: Investments Formalisation des Comités Quality And Cost- Pending 2021-03- 2021-03- 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- 2021-12- COFN / C1540 and capacity building in Post Open - National 9,500.00 0.00 de Gestion des matériels Based Selection Implementation 01 31 10 09 24 19 13 11 the selected landscapes agricoles : Lot 01 : dans le périmètre de Mangindrano Lot 02 : dans le périmètre de Bealanana C 15-20/SOF / Recrutement d'un bureau d'études pour la réalisation d'études, contrôle et Component 2: Investments Quality And Cost- 2021-01- 2020-11- 2021-01- 2021-02- 2020-12- 2021-03- 2021-01- 2021-04- 2021-02- 2021-05- 2021-04- 2021-05- 2021-05- 2022-05- surveillance des travaux COFN / C1540 and capacity building in Post Open - National 270,000.00 87,027.34 Signed Based Selection 06 27 26 22 21 24 20 23 19 10 14 30 03 30 d’extension du réseau the selected landscapes d’irrigation du périmètre d'Ambalavelona Antsamaka Commune Rurale Antsamaka, du paysage de Belanana C 16-20/SOF / Recrutement d'un Bureau d'études pour la réalisation d'études, contrôle et surveillance des travaux: Component 2: Investments Quality And Cost- Under 2021-01- 2020-12- 2021-01- 2021-02- 2021-03- 2021-04- 2021-05- 2021-06- 2022-06- LOT 1: piste depuis IDA / 59790 and capacity building in Post Open - National 234,000.00 0.00 Based Selection Implementation 06 18 26 22 22 21 18 07 07 croisement de la route the selected landscapes "Bealanana-antsamaka"- Beandrarezona ; LOT2: piste "Bealanana- antsamaka"de 15 km de longueur C 18-20/SOF / Recrutement d'un Bureau d'études pour la réalisation d'études, contrôle et surveillance des travaux Component 2: Investments Quality And Cost- Under 2021-01- 2020-12- 2021-01- 2021-02- 2020-12- 2021-03- 2021-01- 2021-04- 2021-05- 2021-05- 2022-05- d'aménagement : COFN / C1540 and capacity building in Post Open - National 622,000.00 0.00 Based Selection Implementation 06 18 26 22 21 24 20 23 10 30 30 LOT 01: Périmètre irrigué the selected landscapes Ambararatabe Nord Ambahivahy Mahatsinjo - LOT 02 Périmètre Irrigué Nord Ouest Ambahivahy Ambararatabe Nord C 01-21/CN / Prestation de la communication (relecture, de synthèse, de Component 3: Project Consultant reprographie et de 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-04- 2021-05- 2021-05- 2021-05- 2021-07- COFN / C1540 Management Coordination Post Qualification Open - National 90,000.00 115,715.44 Signed plaidoyer instituionnel) 29 22 19 25 01 14 21 13 31 02 and M&E Selection autour des Plans d'Aménagement et de Gestion Durable des Paysages (PAGDP). C 01-19/SOF / ONG ou Component 2: Investments Association pour le Quality And Cost- 2020-04- 2020-05- 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-01- COFN / C1540 and capacity building in Post Open - National 32,120.00 0.00 Canceled renouvellement des Based Selection 30 30 29 29 18 21 20 28 the selected landscapes contrats de transfert gestion. C 06-19/BOE / Recrutement d'une ONG ou Association pour Component 2: Investments Quality And Cost- Pending 2021-03- 2021-03- 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- 2022-03- l'opérationnalisation du COFN / C1540 and capacity building in Post Open - National 55,000.00 0.00 Based Selection Implementation 10 30 04 03 23 23 17 25 DINA Régionale et la mise the selected landscapes en œuvre des plans d'action contre les feux de brousses, dans le paysage de Marovoay C 11-20/BOE / Recrutement d'une firme Component 2: Investments pour l'étude de faisabilité Quality And Cost- Under 2021-02- 2021-01- 2021-03- 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-12- COFN / C1540 and capacity building in Post Open - National 9,400.00 0.00 de la mise en place et Based Selection Implementation 17 08 10 23 21 20 25 29 27 the selected landscapes formalisation de comité de gestion de matériels agricoles dans le paysage de Marovoay C 24-20/SOF / Recrutement ONG pour la Mise en place, Formation, Encadrement, et Mise en place d'une cadre Component 2: Investments Quality And Cost- Under 2021-03- 2021-02- 2021-03- 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2022-06- incitative pour l'Association COFN / C1540 and capacity building in Post Open - National 76,000.00 0.00 Based Selection Implementation 01 26 17 21 21 10 10 08 04 des usagers des pistes: the selected landscapes Lot 1: Bealanana- Antsamaka Lot 2: croisement Antsamaka-Beandrarezona Lot 3: RIP 117m Bealanana - Ambatoriha C 21-20/BOE / Firme pour les études, contrôle et surveillance des travaux de Component 2: Investments Quality And Cost- Pending 2021-03- 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-09- stabilisation des bassins COFN / C1540 and capacity building in Post Open - National 100,000.00 0.00 Based Selection Implementation 19 09 23 20 20 24 28 28 versants des canneaux de the selected landscapes périmètre de Marovoay secteur 4, 5 et 6. C 05-19/BOE / Recrutement d'une firme chargée de la Component 2: Investments Quality And Cost- Under 2021-03- 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2022-06- redynamisation et à COFN / C1540 and capacity building in Post Open - National 95,000.00 0.00 Based Selection Implementation 05 26 21 25 25 14 14 12 11 l'élaboration des contrats- the selected landscapes plans pluri-annuels des AUE dans les secteurs 4-5- 6 de Marovoay C 01-20/BOE / Recrutement Component 2: Investments Quality And Cost- Pending 2021-03- 2021-04- 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- 2021-11- d'ONG/Association pour COFN / C1540 and capacity building in Post Open - National 2,000.00 0.00 Based Selection Implementation 12 01 08 07 27 29 30 29 l'instauration et la the selected landscapes formalisation de comités de gestion de matériels agricoles C 06-20/BOE / Etudes, contrôle et surveillance des travaux de réhabilitation des pistes reliant le Chef- lieu de la commune Component 2: Investments Quality And Cost- 2021-03- 2021-03- 2021-03- 2021-05- 2020-12- 2021-06- 2021-01- 2021-07- 2021-03- 2021-08- 2021-03- 2021-09- 2021-04- 2022-04- Ambolomoty à la RN 4 COFN / C1540 and capacity building in Post Open - National 106,000.00 165,601.53 Signed Based Selection 10 25 31 14 28 11 26 11 12 15 26 19 19 02 Lot 1 Piste Ambolomoty – the selected landscapes Marosakoa répartis en 2 lots Lot 2 Piste Ampizaramaso – Maintimaso – Tsiandrarafa – Chantier Sinoa" C 03-21/SOF / ONG pour la mise en place et le Component 2: Investments Consultant renforcement des capacités Pending 2021-06- 2021-07- 2021-09- 2021-10- 2021-11- 2021-12- COFN / C1540 and capacity building in Post Qualification Open - National 24,000.00 0.00 de 40 groupements de Implementation 30 21 03 03 01 31 the selected landscapes Selection maraîcher dans les sous- paysages d'Ambatosia et de Bealanana. C 22-20/SOF / Etude, Contrôle et Surveillance des travaux de réhabilitation du bureau de la Fédération des Component 2: Investments Consultant Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-11- 2021-12- AUE à Bealanana, travaux COFN / C1540 and capacity building in Post Qualification Open - National 29,000.00 0.00 Implementation 30 15 28 27 01 31 complémentaires bureaux the selected landscapes Selection CER Sofia Antsohihy et Bealanana, réhabilitation local bureau Chef Cantonnement Bealanana C 05-20/ANJ / Recrutement d'un Bureau d'Etude pour études, Component 2: Investments Quality And Cost- Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-12- contrôle et surveillance des COFN / C1540 and capacity building in Post Open - National 15,200.00 0.00 Based Selection Implementation 25 16 29 28 18 11 06 06 travaux de construction de the selected landscapes bâtiment à usage de banque de semence à Iazafo et Soanierana Ivongo. C 01-21/SAV / Recrutement d'une firme spécialisée pour la création, formalisation, conduite des formations, suivi et Component 2: Investments Consultant Under 2021-05- 2021-06- 2021-05- 2021-06- 2021-07- 2021-07- 2022-07- encadrement , COFN / C1540 and capacity building in Post Qualification Open - National 55,260.00 0.00 Implementation 21 01 21 27 11 16 16 accompagnement à the selected landscapes Selection l'élaboration des contrats plans pluriannuels des AUEs et le recensement parcellaire des périmètres irrigués à Andapa. C 02-19/SOF / Élaboration Component 2: Investments Quality And Cost- 2020-09- 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-06- d'un cadre incitatif (Contrat COFN / C1540 and capacity building in Post Open - National 56,250.00 0.00 Canceled Based Selection 30 30 23 23 07 05 02 10 Plan Pluriannuel) par AUE the selected landscapes C 17-20/SOF / Recrutement d'un Bureau d'études pour la réalisation d'études, contrôle et Component 2: Investments Quality And Cost- 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-05- 2021-06- 2022-06- surveillance de la mise en IDA / 59790 and capacity building in Post Open - National 195,000.00 0.00 Canceled Based Selection 06 26 22 22 21 16 05 05 œuvre : LOT 01: Travaux the selected landscapes Piste Ambatosia-Anjohibe LOT 02: travaux de réhabilitation d'un ouvrage de franchissement "pont Andranotakatra" C 34-20/SOF / Recrutement d'une firme pour l'étude de faisabilité et la mise en place de Component 2: Investments Quality And Cost- Pending 2020-09- 2020-09- 2020-10- 2020-11- 2020-12- 2020-12- 2021-01- 2021-04- Comités de gestion des COFN / C1540 and capacity building in Post Open - National 12,500.00 0.00 Based Selection Implementation 15 25 25 24 08 28 17 17 matériels agricoles dans les the selected landscapes périmètres d'Anjohibe, de Bealanana I et d'Andranomafana dans le paysage de Bealanana C 03-20/SOF / Recrutement d'une ONG ou association en vue de l’Élaboration des schémas Component 2: Investments d'aménagement Quality And Cost- 2021-03- 2021-03- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-05- COFN / C1540 and capacity building in Post Open - National 252,000.00 0.00 Canceled communaux (SAC) dans la Based Selection 01 22 05 02 02 06 10 18 the selected landscapes district de Bealalana repartis en 03 lots: Lot 01: 06 communes Lot 02 : 05 communes Lot 03: 03 communes C 19-20/SOF / Recrutement ONG en vue de l'élaboration des contrats plans pluriannuels des AUE pour les Component 2: Investments Quality And Cost- Pending 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022-11- périmètres de : COFN / C1540 and capacity building in Post Open - National 240,000.00 0.00 Based Selection Implementation 30 15 19 19 08 08 06 02 Mangindrano, Bealanana I, the selected landscapes Beandrarezona, Anjohibe, Ambalavelona, Anjanaborona, Sahatsara Anjanaborona, Ambahivahy, Nord-Ouest Ambahivahy, Ambovonomby C 21-20/SOF / Recrutement d'un Bureau d'études pour la réalisation Component 2: Investments d'études, contrôle et Quality And Cost- 2021-01- 2020-12- 2021-01- 2021-02- 2021-03- 2021-04- 2021-05- 2021-05- 2022-05- IDA / 59790 and capacity building in Post Open - National 220,000.00 0.00 Canceled surveillance de la mise en Based Selection 06 18 16 12 12 11 08 25 25 the selected landscapes œuvre des travaux pour amélioration de la voie d'accès ralliant Ambatoriha Est-Ambararatabe Nord C 05-20/SAV / Recrutement d'une firme pour la diffusion d'itinéraire Component 2: Investments Quality And Cost- 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-08- 2021-09- 2022-07- technique agricole et la COFN / C1540 and capacity building in Post Open - National 542,000.00 0.00 Canceled Based Selection 30 18 22 22 11 28 17 30 promotion de l'élevage the selected landscapes intensif du paysage d'Andapa, district d'Andapa, Région SAVA C 24-20/CN / Recrutement d'un Bureau Component 2: Investments Consultant Pending 2020-12- 2021-01- 2021-02- 2021-03- 2021-03- 2021-06- d'étude pour la réalisation COFN / C1540 and capacity building in Post Qualification Open - National 32,000.00 0.00 Implementation 22 12 21 03 23 21 de la Mémoire technique de the selected landscapes Selection construction de tuerie. C 04-20/CN / Service de Consultant pour la caractérisation des Component 2: Investments Quality And Cost- Pending 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022-02- 2022-03- 2022-06- ressources en eau et COFN / C1540 and capacity building in Post Open - National 351,300.00 0.00 Based Selection Implementation 24 24 27 27 16 20 27 25 estimation des besoins the selected landscapes dans les 5 paysages d'intervention du PADAP (5 lots) C 05-21/CN / Étude Genre dans le développement de Consultant la filière rizicole à Component 1: Information Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-11- 2021-11- COFN / C1540 Post Qualification Open - National 50,000.00 0.00 Madagascar (Régions : and planning Implementation 24 15 28 27 01 10 Selection Melaky, Sofia, Alaotra Mangoro, Analamanga, Atsinanana). Page 10 C 07-20/ANJ / Etudes et Contrôle-Surveillance des travaux de réhabilitation des périmètres dans le Component 2: Investments Quality And Cost- Pending 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022-02- 2023-02- District de Soanierana COFN / C1540 and capacity building in Post Open - National 153,000.00 0.00 Based Selection Implementation 20 10 24 23 13 17 21 21 Ivongo:Lot 01:PI the selected landscapes Tsaratanàna,Namantoana et Sahasoa;Lot 02:PI Ambatonandroka,Vaniaraka et Antanetilava C 19-20/ANJ / Etudes,Contrôle et surveillance des travaux de réhabilitation des pistes à Iazafo et Soanierana Component 2: Investments Ivongo:Lot 01:Antanifotsy à Quality And Cost- Pending 2021-08- 2021-09- 2021-10- 2021-11- 2021-11- 2021-12- 2022-01- 2023-01- COFN / C1540 and capacity building in Post Open - National 283,500.00 0.00 Marovinanto;Lot Based Selection Implementation 25 24 19 18 28 18 12 12 the selected landscapes 02:Maromitety à Mahanoro,Maromitety à Vavazahana,Marofototra à Mahanoro et Ambodinonoka à Mahatera. C 04-20/ANJ / Recrutement de firme pour l'instauration et la Component 2: Investments Quality And Cost- Pending 2021-08- 2021-09- 2021-11- 2021-12- 2021-12- 2022-01- 2022-03- 2022-05- formalisation de neuf (09) COFN / C1540 and capacity building in Post Open - National 12,000.00 0.00 Based Selection Implementation 30 29 02 02 22 26 02 31 comités de gestion des the selected landscapes matériels agricole dans le paysage d'Iazafo et Soanierana Ivongo C 16-20/ANJ / Etudes et Contrôle-Surveillance des travaux de réhabilitation Component 2: Investments des barrages et des Quality And Cost- Pending 2021-08- 2021-09- 2021-11- 2021-12- 2021-12- 2022-02- 2022-03- 2023-03- COFN / C1540 and capacity building in Post Open - National 64,000.00 0.00 ouvrages connexes dans la Based Selection Implementation 30 20 03 01 31 04 11 11 the selected landscapes zone Ambatoharanana du paysage d'Iazafo;CR Ambatoharanana-District de Fénérive Est C 03-20/ANJ / Etudes et Contrôle-Surveillance des travaux de réhabilitation des réseaux d'irrigation et de drainage des périmètres Component 2: Investments Quality And Cost- Pending 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022-02- 2023-02- Ampoezana, Anamborano, COFN / C1540 and capacity building in Post Open - National 94,000.00 0.00 Based Selection Implementation 17 07 21 18 18 22 26 26 Fandrianomby et the selected landscapes Antsirabeniseva; CR Soanierana Ivongo et Fotsialanana-District de Soanierana Ivongo C 18-20/ANJ / Etudes (APS, APD, DAO, EIE), Contrôle et surveillance des travaux de protection des Component 2: Investments berges des rivières dans le Quality And Cost- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-11- COFN / C1540 and capacity building in Post 65,040.00 0.00 Canceled paysage de Soanierana Based Selection 17 07 21 18 17 22 26 26 the selected landscapes Ivongo : - Sahave dans la Commune Soanierana Ivongo - Sahafotra dans la Commune Antanifotsy INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-UGP PADAP-38775-CS- INDV / Responsable de Component 3: Project Individual 2017-11- 2017-08- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018-03- 2019-02- Passation des marchés IDA / 59790 Management Coordination Post Consultant Open 48,000.00 11,178.36 Signed 30 17 30 06 09 08 02 26 02 pour l'unité de and M&E Selection Coordination Régionale d'Andapa. MG-UGP PADAP-38776-CS- INDV / Responsable de Component 3: Project Individual 2017-11- 2017-08- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2019-02- Passation des Marchés IDA / 59790 Management Coordination Post Consultant Open 48,000.00 13,209.42 Signed 30 17 19 29 23 22 31 22 (RPM) pour l'Unité de and M&E Selection Coordination Régionale de Sofia. C 61-17/CN / Component 3: Project Individual Responsable Administratif 2017-11- 2017-09- 2017-12- 2017-11- 2018-01- 2018-02- 2018-02- 2018-02- 2019-02- IDA / 59790 Management Coordination Post Consultant Open 48,000.00 14,267.74 Signed et Finacier (RAF) pour 30 05 30 02 09 09 02 27 02 and M&E Selection l'Unité de Coordination Régionale d'Analanjirofo. C 62-17/CN / Responsable de Passation Component 3: Project Individual 2017-11- 2017-08- 2018-01- 2018-04- 2018-01- 2018-04- 2018-02- 2018-05- 2019-02- des Marchés (RPM) pour IDA / 59790 Management Coordination Post Consultant Open 48,000.00 12,272.69 Signed 27 17 16 24 26 27 19 02 19 l'Unité de Coordination and M&E Selection Régionale d'Analanjirofo. MG-UGP PADAP-38779-CS- INDV / Responsable Component 3: Project Individual 2017-11- 2017-09- 2017-12- 2017-11- 2018-01- 2018-02- 2018-02- 2018-02- 2019-02- Administratif et Finacier IDA / 59790 Management Coordination Post Consultant Open 48,000.00 14,308.06 Signed 30 05 30 02 09 16 02 27 02 (RAF) pour l'Unité de and M&E Selection Coordination Régionale de Sava. MG-UGP PADAP-38780-CS- INDV / Responsable Component 3: Project Individual 2017-11- 2017-09- 2017-12- 2017-11- 2018-01- 2018-02- 2018-02- 2018-02- 2019-02- Administratif et Finacier IDA / 59790 Management Coordination Post Consultant Open 48,000.00 11,889.78 Signed 30 05 30 02 09 09 02 27 02 (RAF) pour l'Unité de and M&E Selection Coordination Régionale de Sofia. C 63-14/CN / Comptable Component 3: Project Individual 2017-11- 2017-09- 2017-12- 2018-02- 2018-01- 2018-02- 2018-02- 2018-02- 2019-02- pour l'Unité de IDA / 59790 Management Coordination Post Consultant Open 12,000.00 8,181.79 Signed 30 05 30 08 09 09 02 27 02 Coordination Régionale and M&E Selection d'Analanjirofo. C 57-17/CN / Component 3: Project Individual 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-02- 2018-01- 2019-02- Responsable eau/irrigation IDA / 59790 Management Coordination Post Consultant Open 48,000.00 12,980.94 Signed 01 22 31 10 03 03 18 03 national du Projet. and M&E Selection Component 3: Project Individual C 49-17/CN / Comptable 2017-11- 2017-09- 2017-12- 2017-11- 2018-01- 2018-02- 2018-02- 2018-02- 2019-02- IDA / 59790 Management Coordination Post Consultant Open 24,000.00 11,923.38 Signed national du PADAP. 30 14 30 02 09 01 02 26 02 and M&E Selection MG-UGP PADAP-38784-CS- Component 3: Project Individual INDV / Comptable pour 2017-11- 2017-09- 2017-12- 2017-11- 2018-01- 2018-02- 2018-02- 2018-03- 2019-02- IDA / 59790 Management Coordination Post Consultant Open 12,000.00 8,176.03 Signed l'Unité de Coordination 30 05 30 02 09 28 02 01 02 and M&E Selection Régionale de Sofia. MG-UGP PADAP-38778-CS- INDV / Responsable Component 3: Project Individual 2017-11- 2017-09- 2017-12- 2017-11- 2018-01- 2018-02- 2018-02- 2018-02- 2019-02- Administratif et Finacier IDA / 59790 Management Coordination Post Consultant Open 48,000.00 13,588.32 Signed 30 05 30 02 09 09 02 27 02 (RAF) pour l'Unité de and M&E Selection Coordination Régionale de Boeny. MG-UGP PADAP-38781-CS- Component 3: Project Individual INDV / Comptable pour 2017-11- 2017-09- 2017-12- 2018-02- 2018-01- 2018-02- 2018-02- 2018-02- 2019-02- IDA / 59790 Management Coordination Post Consultant Open 12,000.00 8,181.79 Signed l'Unité de Coordination 30 05 30 08 09 09 02 27 02 and M&E Selection Régionale de Boeny. MG-UGP PADAP-38783-CS- Component 3: Project Individual INDV / Comptable pour 2017-11- 2017-09- 2017-12- 2018-03- 2018-01- 2018-03- 2018-02- 2018-03- 2019-02- IDA / 59790 Management Coordination Post Consultant Open 12,000.00 8,176.03 Signed l'Unité de Coordination 30 05 30 01 09 05 02 07 02 and M&E Selection Régionale de Sava. MG-UGP PADAP-38445-CS- INDV / Responsable de Component 3: Project Individual 2017-11- 2017-08- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- 2019-01- Passation des Marchés IDA / 59790 Management Coordination Post Consultant Open 48,000.00 13,166.16 Signed 27 17 27 06 23 30 15 30 (RPM) pour l'Unité de and M&E Selection Coordination Régionale de Boeny. C 65-17/CN / 04 Responsables en Agriculture pour les 04 Unités de Gestion régionale Component 3: Project Individual 2018-01- 2018-01- 2018-02- 2018-04- 2018-03- 2018-04- 2018-04- 2018-05- 2019-04- 2018-05- du PADAP : Iazafo- IDA / 59790 Management Coordination Post Consultant Open 192,000.00 23,032.99 Signed 08 25 17 17 10 24 14 02 14 02 Soanierana Ivongo (Région and M&E Selection Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA) C 69-17/CN / 04 Responsables Socio-orga et développement local pour les 04 Unités de Gestion Component 3: Project Individual 2018-01- 2017-12- 2018-02- 2018-04- 2018-03- 2018-04- 2018-04- 2018-04- 2019-04- régionale du PADAP : Iazafo- IDA / 59790 Management Coordination Post Consultant Open 192,000.00 40,130.70 Signed 08 28 16 17 09 25 13 26 13 Soanierana Ivongo (Région and M&E Selection Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA). C 67-17/CN / 04 Responsables en environnement et Foresterie pour les 04 Component 3: Project Individual Unités de Gestion régionale 2018-01- 2018-02- 2018-02- 2018-04- 2018-03- 2018-05- 2018-04- 2018-05- 2019-04- IDA / 59790 Management Coordination Post Consultant Open 192,000.00 43,958.48 Signed du PADAP : Iazafo- 08 07 17 19 10 02 14 14 14 and M&E Selection Soanierana Ivongo (Région Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA). C 55-17/CN / Component 3: Project Individual Responsable Sauvegarde 2018-01- 2018-02- 2018-02- 2018-03- 2018-03- 2018-04- 2018-04- 2018-05- 2019-04- IDA / 59790 Management Coordination Post Consultant Open 48,000.00 15,286.86 Signed Environnementale et 08 23 17 30 10 27 14 02 14 and M&E Selection Sociale au niveau national (UGP) MG-UGP PADAP-44922-CS- INDV / 04 Responsables Eau et Irrigation pour les 04 Unités de Gestion Component 3: Project Individual 2018-01- 2018-02- 2018-03- 2018-04- 2018-04- 2018-04- 2018-05- 2018-05- 2019-05- régionale du PADAP : Iazafo- IDA / 59790 Management Coordination Post Consultant Open 192,000.00 43,958.48 Signed 22 08 12 17 02 27 07 02 07 Soanierana Ivongo (Région and M&E Selection Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA). C 60-17/CN / 04 Assistants techniques des Opérations pour chaque Unité de Gestion Régionale Component 3: Project Individual 2017-12- 2017-10- 2017-12- 2018-01- 2018-01- 2018-02- 2018-02- 2018-05- 2019-02- du PADAP : Iazafo- IDA / 59790 Management Coordination Post Consultant Open 384,000.00 58,083.89 Signed 01 23 31 22 10 23 03 02 03 Soanierana Ivongo (Région and M&E Selection Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA). Component 3: Project Individual MG-UGP PADAP-44950-CS- 2018-01- 2018-03- 2018-02- 2018-05- 2018-03- 2018-06- 2018-03- 2018-06- 2019-03- IDA / 59790 Management Coordination Post Consultant Open 48,000.00 17,197.72 Signed INDV / Auditeur interne 22 21 26 18 13 27 28 29 28 and M&E Selection MG-UGP PADAP-59456-CS- CDS / Recrutement d'un consultant international en Component 2: Investments 2018-04- 2018-04- 2018-05- 2018-04- 2018-06- 2018-05- 2018-07- vue de la finalisation du IDA / V0430 and capacity building in Post Direct Selection Direct 30,250.00 40,425.00 Signed 16 30 06 30 29 15 29 plan d'actions sur la the selected landscapes gestion des bois précieux (Diospyros spp, Dalbergia spp) MG-UGP PADAP-59459-CS- INDV / Recrutement d'un consultant national Component 2: Investments Individual francophone pour 2018-04- 2018-05- 2018-05- 2018-04- 2018-05- 2018-05- 2018-06- 2018-05- 2018-07- IDA / V0430 and capacity building in Post Consultant Limited 10,000.00 2,437.96 Signed l'assistance au consultant 16 14 16 19 26 21 15 21 15 the selected landscapes Selection international en vue de la finalisation du plan d'actions sur la gestion des bois précieux. C 11-18/CN / Etude sur la Component 3: Project Individual 2018-05- 2018-06- 2018-06- 2018-06- 2018-06- 2018-08- 2018-06- 2018-09- Rénovation locaux de l'UGP IDA / 59790 Management Coordination Post Consultant Open 2,500.00 2,172.74 Signed 09 06 07 28 14 02 29 01 à Nanisana. and M&E Selection MG-UGP PADAP-64943-CS- INDV / Prestations d'un consultant individuel pour le poste de Component 3: Project Individual 2018-06- 2018-07- 2018-07- 2018-10- 2018-07- 2018-10- 2018-08- 2018-10- 2019-08- Responsable en Suivi- IDA / 59790 Management Coordination Post Consultant Open 48,000.00 12,229.49 Signed 01 09 16 08 23 11 12 12 12 évaluation pour l'Unité de and M&E Selection Coordination Régionale de PADAP-Région ANALANJIROFO Page 11 MG-UGP PADAP-65206-CS- CDS / Prestations pour 03 Component 3: Project ans d'un consultant 2018-06- 2018-04- 2018-06- 2018-07- 2018-04- 2021-07- IDA / 59790 Management Coordination Post Direct Selection Direct 65,000.00 76,705.15 Signed individuel pour le poste de 04 19 14 18 23 17 and M&E RESPONSABLE ADMINISTRATIF ET FINANCIER du projet PADAP. MG-UGP PADAP-66144-CS- INDV / Prestations d'un Component 3: Project Individual consultant individuel pour 2018-06- 2018-02- 2018-07- 2018-03- 2018-08- 2018-03- 2018-09- 2018-03- 2019-09- IDA / 59790 Management Coordination Post Consultant Open 10,000.00 7,459.85 Signed le poste d'Assistant 11 20 20 21 10 22 03 26 03 and M&E Selection Informatique pour l'Unité de Gestion du PADAP MG-UGP PADAP-75687-CS- CDS / Prestations pour 03 Component 3: Project ans d'un consultant 2018-08- 2017-01- 2018-09- 2018-10- 2018-08- 2021-10- IDA / 59790 Management Coordination Post Direct Selection Direct 65,000.00 21,196.62 Signed individuel pour le poste de 27 16 06 10 01 09 and M&E RESPONSABLE PASSATION DES MARCHES du projet PADAP C 42-18/CN / La mise en place d'un système Individual Component 1: Information 2018-08- 2018-08- 2018-11- 2019-01- 2018-11- 2019-02- 2018-12- 2019-02- 2019-04- d'information IDA / 59790 Post Consultant Open 10,000.00 7,436.62 Signed and planning 30 30 08 15 18 05 23 08 22 géographique des Selection périmètres hydroagricoles (SIGPHY) C 17-18/CN / Adaptation de la méthodologie et le Individual Component 1: Information 2018-11- 2018-09- 2018-12- 2018-12- 2019-01- 2019-01- 2019-01- 2019-04- protocole du MEEF des IDA / 59790 Post Consultant Open 25,000.00 15,699.95 Signed and planning 09 24 08 18 03 18 11 03 inventaires forestiers et Selection écologiques. MG-UGP PADAP-86980-CS- CDS / Prestations d'un an Component 3: Project d'un consultant individuel 2018-11- 2018-10- 2018-11- 2018-12- 2018-10- 2019-12- IDA / 59790 Management Coordination Post Direct Selection Direct 20,250.00 18,284.62 Signed pour le poste d'Assistant 13 02 23 27 18 27 and M&E Technique des Opérations du projet PADAP C 54-17/CN / Component 3: Project Individual 2018-01- 2018-02- 2018-03- 2018-04- 2019-04- Responsable en Agriculture IDA / 59790 Management Coordination Post Consultant Open 48,000.00 0.00 Canceled 08 16 09 13 13 au niveau national (UGP) and M&E Selection C 10-19/ANJ / Component 2: Investments Individual 2019-03- 2019-05- 2019-05- 2019-06- 2019-09- Recrutement d'agent de COFN / C1540 and capacity building in Post Consultant Open 6,560.00 0.00 Canceled 12 18 28 17 25 suivi et d'accompagnement the selected landscapes Selection des COBA. MG-UGP PADAP-86978-CS- CDS / Protocole d'accord PAPRIZ pour les Chaînes de valeur riz irrigué Component 2: Investments 2018-11- 2018-10- 2018-11- 2019-01- 2019-02- (Introduction des nouvelles IDA / 59790 and capacity building in Post Direct Selection Direct 31,400.00 0.00 Canceled 13 16 30 13 12 technologie à travers de the selected landscapes formation, Facilitation d'accés à des intrants et des materiels Agricoles) MG-UGP PADAP-87818-CS- CDS / Protocole d'accord avec la DREEF analanjirofo Component 2: Investments 2018-11- 2018-12- 2019-01- 2019-05- pour la redynamisation et IDA / 59790 and capacity building in Post Direct Selection Direct 35,000.00 0.00 Canceled 22 09 12 12 renforcement de capacité the selected landscapes des COBA existants dans le paysage de Soanierana Ivongo MG-UGP PADAP-87819-CS- CDS / Protocole d'accord avec la DREEF Sofia pour la Component 2: Investments 2018-11- 2018-12- 2019-01- 2019-05- redynamisation et IDA / 59790 and capacity building in Post Direct Selection Direct 25,000.00 0.00 Canceled 22 09 12 12 renforcement de capacité the selected landscapes des COBA existants dans le paysage de Soanierana Ivongo C 02-18/CN / Protocole avec DPV sur l'atelier de Component 2: Investments 2018-05- 2018-05- 2018-07- 2019-04- formation et production IDA / 59790 and capacity building in Post Direct Selection Direct 40,000.00 0.00 Canceled 09 26 09 05 des fiches techniques de the selected landscapes gestion des pestes et pesticides MG-UGP PADAP-127049- CS-CDS / Contrôle et surveillance des travaux sur PI d’Iazafo : LOT 3: réseaux d’irrigation Component 2: Investments 2019-08- 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2020-02- et drainage zone COFN / C1540 and capacity building in Post Direct Selection Direct 72,900.00 68,676.43 Signed 16 09 23 28 21 24 18 d’Antsiratenina-Nosibe the selected landscapes LOT 4: réseaux d’irrigation et drainage zone d’Ambatomipaka- Maromitety LOT 6: réseaux d’irrigation zone de Mahatsara MG-UGP PADAP-127177- CS-CDS / Contrôle&surveillance des travaux sur PI Andranomafana Component 2: Investments Mangindrano-paysage 2019-08- 2019-08- 2019-08- 2019-08- 2019-09- 2019-08- 2020-02- COFN / C1540 and capacity building in Post Direct Selection Direct 47,900.00 42,922.67 Signed Bealanana : 16 09 23 23 21 26 18 the selected landscapes -lot n°2: canal CPRD du pm 2153 jusqu’au bout du réseau -lot n°3: canal CPRG 1er tronçon de 2921 m -lot n°4: canal CPRG 2ème tronçon de 3261 m -lot n°5: piste/et C 22-18/CN pont Protocole avec réseau des Component 1: Information 2018-04- 2018-05- 2018-07- 2019-02- observatoires rureaux sur IDA / 59790 Post Direct Selection Direct 20,000.00 0.00 Canceled and planning 30 17 21 16 l'observatoire des données socio-économiques pour le paysage de Bealanana. C 07-19/ANJ / Appui aux dialogues public-privé Component 2: Investments Individual 2019-03- 2019-05- 2019-05- 2019-06- 2019-09- régionaux pour la IDA / 59790 and capacity building in Post Consultant Open 4,000.00 0.00 Canceled 12 11 21 10 18 promotion de 3P dans the selected landscapes Selection l'agriculture et l'élevage C 02-20/BOE / Recrutement de 3 Consultants Individuels pour la validation expérimentale des paquets Component 2: Investments Individual techniques agroécologie, 2020-05- 2020-05- 2020-07- 2020-08- 2020-07- 2020-08- 2020-08- 2020-10- 2022-08- COFN / C1540 and capacity building in Post Consultant Open 5,800.00 4,204.56 Signed agroforesterie, 22 08 16 01 27 03 26 16 26 the selected landscapes Selection arboriculture et cultures fourragères Lot 1: Commune d'Ambolomoty Lot 2: Commune Tsararano Lot 3: Commune Anosinalainolona C 03-18/BOE / Recrutement d'un consultant individuel Component 2: Investments Individual 2020-01- 2020-03- 2020-03- 2020-03- 2020-12- chargé du diagnostic du IDA / 59790 and capacity building in Post Consultant Open 5,000.00 0.00 Canceled 21 08 10 15 22 fonctionnement et the selected landscapes Selection opérationnalisation de la Banque de semences au CMS Tsararano. C 06-20/CN / Responsables en Component 3: Project Individual 2020-05- 2020-01- 2020-07- 2020-05- 2020-07- 2020-05- 2020-08- 2020-07- 2022-07- environnement et COFN / C1540 Management Coordination Post Consultant Open 35,000.00 9,410.11 Signed 18 20 06 13 27 15 31 01 30 Foresterie pour Unité de and M&E Selection Gestion régionale du PADAP Andapa (Région SAVA). C 07-20/CN / Component 3: Project Responsable Administratif 2020-05- 2020-02- 2020-05- 2020-02- 2020-08- 2020-03- 2022-08- IDA / 59790 Management Coordination Post Direct Selection Direct 170,000.00 121,661.24 Signed et Finacier (RAF) pour les 18 03 28 26 01 01 01 and M&E 04 CERs (Sava, Boeny, Analanjirofo et Sofia) C 08-20/CN / Component 3: Project Responsable Passation des 2020-05- 2020-02- 2020-05- 2020-02- 2020-08- 2020-05- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 170,000.00 98,127.18 Signed marchés pour les 04 CERs 18 03 28 20 01 14 01 and M&E (Sava, Sofia, Boeny et Analanjirofo). C 09-20/CN / Comptable Component 3: Project 2020-05- 2020-02- 2020-05- 2020-02- 2020-08- 2020-03- 2022-08- pour les 04 CERs (Sava, COFN / C1540 Management Coordination Post Direct Selection Direct 85,000.00 73,670.47 Signed 18 17 28 25 01 06 01 Sofia, Boeny et and M&E Analanjirofo). C 10-20/CN / Component 3: Project Responsable Eau et 2020-05- 2020-04- 2020-05- 2020-04- 2020-08- 2020-05- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 120,000.00 88,330.28 Signed Irrigation pour les 04 CERs 18 10 28 20 01 01 01 and M&E (Sava, Sofia, Boeny et Analanjirofo). C 11-20/CN / Responsables Socio-orga et développement local pour Component 3: Project les 04 CERs du PADAP : 2020-05- 2020-04- 2020-05- 2020-04- 2020-08- 2020-05- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 115,000.00 83,913.76 Signed Iazafo-Soanierana Ivongo 18 10 28 27 01 01 01 and M&E (Région Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA). C 12-20/CN / 04 Assistants techniques des Opérations pour chaque Component 3: Project CER du PADAP : Iazafo- 2020-05- 2020-01- 2020-05- 2021-02- 2020-08- 2021-02- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 200,000.00 120,566.77 Signed Soanierana Ivongo (Région 18 24 28 19 01 26 01 and M&E Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA). C 13-20/CN / 03 Responsables en environnement et Component 3: Project Foresterie pour les 03 CER 2020-05- 2020-04- 2020-05- 2020-04- 2020-08- 2020-05- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 90,000.00 65,920.56 Signed du PADAP : Iazafo- 18 16 28 27 01 12 01 and M&E Soanierana Ivongo (Région Analanjirofo), Marovoay (Région Boeny) et Bealalana (Région SOFIA). C 14-20/CN / 03 Responsables en Agriculture pour les 03 CER Component 3: Project 2020-05- 2020-03- 2020-05- 2020-04- 2020-08- 2020-04- 2022-08- du PADAP : Iazafo- COFN / C1540 Management Coordination Post Direct Selection Direct 90,000.00 66,498.81 Signed 18 26 28 27 01 27 01 Soanierana Ivongo (Région and M&E Analanjirofo), Marovoay (Région Boeny) et Andapa (Région SAVA) C 15-20/CN / Component 3: Project Responsable en Suivi- 2020-05- 2020-05- 2020-05- 2020-05- 2020-08- 2020-10- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 40,000.00 19,598.78 Signed évaluation pour la Région 18 19 28 29 01 09 01 and M&E ANALANJIROFO du PADAP. Component 3: Project C 18-20/CN / Comptable 2020-05- 2020-02- 2020-05- 2020-02- 2020-08- 2020-02- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 40,000.00 28,308.96 Signed national du PADAP. 18 17 28 26 01 26 01 and M&E C 16-20/CN / Component 3: Project Responsable Sauvegarde 2020-05- 2020-05- 2020-05- 2020-04- 2020-08- 2020-04- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 40,000.00 32,056.56 Signed Environnementale et 18 18 28 28 01 28 01 and M&E Sociale au niveau national (UGP). C 17-20/CN / Assistant Component 3: Project Technique des Opérations 2020-05- 2020-05- 2020-05- 2020-10- 2020-08- 2020-10- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 48,000.00 29,064.61 Signed du projet PADAP au niveau 18 18 28 09 01 16 01 and M&E de l'UGP. C 21-20/CN / Assistant Component 3: Project 2020-05- 2020-03- 2020-05- 2020-03- 2020-08- 2020-04- 2022-08- Informatique pour l'Unité COFN / C1540 Management Coordination Post Direct Selection Direct 21,000.00 16,253.16 Signed 18 23 28 23 01 01 01 de Gestion du PADAP. and M&E Component 3: Project C 20-20/CN / Auditeur 2020-05- 2020-05- 2020-05- 2020-06- 2020-08- 2020-07- 2022-08- COFN / C1540 Management Coordination Post Direct Selection Direct 48,000.00 33,884.58 Signed interne du Projet. 18 18 28 22 01 01 01 and M&E C 19-20/CN / Component 3: Project 2020-05- 2020-01- 2020-05- 2020-01- 2020-08- 2020-01- 2022-08- Responsable eau et COFN / C1540 Management Coordination Post Direct Selection Direct 37,000.00 29,710.39 Signed 18 13 28 13 01 17 01 irrigation national du and M&E Projet. Page 12 C 11-20/SOF / Recrutement d’un Consultant Spécialiste en Travaux Publics chargé de Component 2: Investments Individual 2020-06- 2020-12- 2020-07- 2021-05- 2020-08- 2021-05- 2020-08- 2021-06- 2021-06- l’appui à la Cellule IDA / 59790 and capacity building in Post Consultant Open 9,500.00 9,911.20 Signed 17 30 29 11 05 14 19 15 15 d’exécution Régionale Sofia the selected landscapes Selection sur l’exécution des travaux de réhabilitation de la RIP 117 reliant Bealanana à Ambatoriha C 26-18/ CN / Diagnostic agroécologique et Component 2: Investments 2018-05- 2018-10- 2018-05- 2018-11- 2018-07- 2018-12- Formation des IDA / 59790 and capacity building in Post Direct Selection Direct 45,000.00 0.00 Canceled 09 26 26 22 20 17 Organisations paysannes et the selected landscapes des paysans sur les pratiques agroécologiques C 03-20/SAV / Recrutement de 02 techniciens agricoles pour encadrer les 300 paysans adoptants en riziculture Component 2: Investments Individual ameliorée dans le paysage 2020-08- 2020-08- 2020-09- 2020-11- 2020-10- 2020-12- 2020-11- 2020-12- 2021-05- COFN / C1540 and capacity building in Post Consultant Open 5,630.00 7,865.70 Signed d'Andapa: 05 20 23 24 14 03 18 16 17 the selected landscapes Selection Lot 1: Un technicien s'occupant des périmètres de l'axe nord Lot 2: Un technicien s'occupant des périmètres de l'axe ouest C 06-20/ANJ / Consultant Component 2: Investments Individual individuel pour formation 2020-04- 2020-06- 2020-06- 2020-07- 2020-10- COFN / C1540 and capacity building in Post Consultant Open 5,140.00 0.00 Canceled des dirigeants du 17 13 21 22 20 the selected landscapes Selection Tranoben'ny Tantsaha C 09-19/ANJ / Recrutement d'un consultant individuel pour/ Lot 1: la formation en GIRE Component 2: Investments Individual des personnels de 2020-04- 2020-06- 2020-06- 2020-07- 2020-12- COFN / C1540 and capacity building in Post Consultant Open 4,500.00 0.00 Canceled DREEH/DRAEP/DREDD 13 09 19 20 17 the selected landscapes Selection Lot 2: Diffuser et expliquer les rôles, responsabilités de l’Autorité Nationale de l’Eau et de l’Assainissement C 23-20/CN / Responsables en Component 3: Project 2020-06- 2020-06- 2020-07- 2020-06- 2020-08- 2020-07- 2022-08- Agriculture pour la cellule COFN / C1540 Management Coordination Post Direct Selection Direct 23,000.00 20,447.60 Signed 30 30 10 29 09 01 09 d'exécution régionale du and M&E PADAP Région SOFIA (Basé à Bealalana). C 27-20/CN / Recrutement d’un Component 3: Project Individual Responsable Agriculture au 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- 2020-10- 2020-11- 2020-11- 2022-08- IDA / 59790 Management Coordination Post Consultant Open 20,000.00 11,440.66 Signed niveau de l’Unité de 28 28 28 29 04 29 18 11 10 and M&E Selection Gestion du Projet Agriculture Durable par une Approche Paysage C 26-20/CN / Assistant Component 2: Investments 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2021-01- technique pour la gestion COFN / C1540 and capacity building in Post Direct Selection Direct 90,000.00 11,872.80 Signed 03 16 13 17 13 17 11 des contrats. the selected landscapes C 12-20/SOF / Recrutement d'un Component 2: Investments Individual 2020-10- 2020-12- 2020-11- 2021-05- 2020-12- 2021-05- 2021-01- 2021-06- 2022-03- Consultant Individuel COFN / C1540 and capacity building in Post Consultant Open 13,500.00 9,911.20 Signed 15 30 28 11 08 14 06 09 02 spécialiste en irrigation the selected landscapes Selection pour appuyer la Cellule d’exécution Régionale Sofia C 29-20/CN / Component 3: Project Individual 2020-11- 2020-11- 2021-01- 2021-05- 2021-01- 2021-05- 2021-02- 2021-05- 2022-08- Recrutement d'un Assistant COFN / C1540 Management Coordination Post Consultant Open 8,500.00 5,769.58 Signed 30 26 19 11 29 12 26 21 04 Administratif et Financier. and M&E Selection C 30-20/CN / Recrutement de 04 Component 3: Project Individual 2020-11- 2020-11- 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2022-08- Secrétaires en passation COFN / C1540 Management Coordination Post Consultant Open 34,000.00 9,736.23 Signed 30 25 19 25 29 27 26 15 04 des marchés en tant que and M&E Selection personnel d'appui pour les CER du PADAP. C 31-20/CN / Spécialiste Component 3: Project Individual 2020-11- 2020-12- 2021-01- 2021-01- 2021-01- 2021-03- 2021-02- 2021-04- 2022-08- en Passation des marchés COFN / C1540 Management Coordination Post Consultant Open 16,000.00 10,812.70 Signed 30 01 19 22 29 25 26 15 04 au niveau de l'UGP. and M&E Selection C 13-20/SOF / Recrutement d'un Component 2: Investments Individual Consultant Individuel Under 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2022-06- COFN / C1540 and capacity building in Post Consultant Open 13,500.00 0.00 spécialiste en infrastructure Implementation 18 30 31 10 02 05 the selected landscapes Selection routière pour appuyer la Cellule d’exécution Régionale Sofia C 26-20/BOE / Recrutement de consultant Component 2: Investments Individual individuel pour Pending 2021-02- 2021-03- 2021-04- 2021-04- 2021-11- COFN / C1540 and capacity building in Post Consultant Open 3,600.00 0.00 l'encadrement technique Implementation 18 24 03 23 19 the selected landscapes Selection des 40 pisciculteurs dans les CR de Marosakoa, d'Ambolomoty et de Tsararano C 28-20/CN / 02 Responsables en Suivi- Component 3: Project Individual 2020-12- 2020-12- 2021-02- 2021-02- 2021-02- 2021-04- 2021-03- 2021-05- 2022-07- évaluation dont 01 pour la COFN / C1540 Management Coordination Post Consultant Open 36,000.00 13,996.22 Signed 18 10 06 18 16 07 05 20 30 Région SOFIA et 01 pour la and M&E Selection région de SAVA du PADAP. C 28-20/BOE / Recrutement de 3 Consultants individuels pour l'encadrement Component 2: Investments Individual Under 2021-02- 2021-03- 2021-04- 2021-04- 2021-05- 2021-12- technique et suivi de COFN / C1540 and capacity building in Post Consultant Open 12,600.00 0.00 Implementation 25 01 05 26 31 27 l'adoption du paquet the selected landscapes Selection technique par les riziculteurs. Lot 1 d'Ambolomoty, lot 2 Tsararano Lot 3 Anosinalinolona C 14-20/ANJ / Recrutement de 8 Techniciens en environnement: Lot 1:1/3 CR Vavatenina zone Sud Component 2: Investments Individual Lot 2:1/1 CR Vavatenina 2020-10- 2020-12- 2020-12- 2021-02- 2023-02- COFN / C1540 and capacity building in Post Consultant Open 71,300.00 0.00 Canceled zone Nord-2CR Fen Est 30 13 28 01 01 the selected landscapes Selection Lot 3:2/3CR Soanierana Ivongo zone Sud Lot 4:1/CR Antanifotsy- Manompana Lot 5: 1/CR Ambahoabe- Ambodiampana Lot 6:1/CR Antenina C 19-20/BOE / Recrutement de deux (2) techniciens forestiers Component 2: Investments Individual Pending 2021-03- 2021-04- 2021-05- 2021-06- 2021-12- Lot 1: Zone Marosakoa- COFN / C1540 and capacity building in Post Consultant Open 21,000.00 0.00 Implementation 04 22 13 17 14 Ambolomoty the selected landscapes Selection Lot 2: Zone Tsararano- Anosinalainolona C 35-20/SOF / Recrutement de trois (03) consultants individuels au titre de techniciens Component 2: Investments Individual accompagnateurs pour Under 2021-01- 2020-10- 2021-02- 2021-02- 2021-03- 2021-10- COFN / C1540 and capacity building in Post Consultant Open 33,500.00 0.00 l'encadrement et l'appui Implementation 06 15 10 20 09 05 the selected landscapes Selection conseils de proximité aux paysans formateurs et paysans adoptant la riziculture améliorée dans le paysage de Bealanana C 05-20/CN / Responsables en Component 3: Project Individual 2020-04- 2020-04- 2020-06- 2020-07- 2020-08- 2022-08- Agriculture pour la cellule IDA / 59790 Management Coordination Post Consultant Open 48,000.00 0.00 Canceled 30 23 18 09 13 13 d'exécution régionale du and M&E Selection PADAP Région SOFIA (Basé à Bealalana). C 22-20/BOE / Recrutement d'un Consultant individuel pour Component 2: Investments Individual le contrôle et surveillance Pending 2021-04- 2021-06- 2021-06- 2021-07- 2021-11- COFN / C1540 and capacity building in Post Consultant Open 5,000.00 0.00 des Travaux de Implementation 13 01 22 21 18 the selected landscapes Selection stabilisation des zones d'érosion et protection des réseaux hydroagricole le long du CPRD et CSPC Ambolomoty C 10-20/BOE / Recrutement d'un consultant individuel pour identification, formation Component 2: Investments Individual Pending 2021-03- 2021-05- 2021-05- 2021-06- 2022-02- des Paysans formateurs et COFN / C1540 and capacity building in Post Consultant Open 5,400.00 0.00 Implementation 10 03 24 28 23 encadrement de 06 ateliers the selected landscapes Selection d'élevage bovin pilotes dans les CR d'Ambolomoty, de Tsararano et d'Anosinalainolona C 05-21/ANJ / Recrutement Component 2: Investments Individual d’un(e)consultant(e) Under 2021-02- 2021-02- 2021-04- 2021-05- 2021-04- 2021-05- 2021-04- 2022-04- COFN / C1540 and capacity building in Post Consultant Open 11,884.00 9,911.20 spécialiste en travaux Implementation 25 16 06 11 07 14 27 27 the selected landscapes Selection publics charge de l’appui a la cellule d’exécution régionale Analanjirofo C 20-20/ANJ / Assistance technique de FDA pour la Component 2: Investments 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- 2021-06- 2022-07- mise en oeuvre d'AGR COFN / C1540 and capacity building in Post Direct Selection Direct 531,956.00 67,639.56 Signed 26 12 18 23 27 07 21 priorisées dans les the selected landscapes paysages d'Iazafo et de Soanierana Ivongo C 7-20/BOE / Recrutement de 3 consultants individuels pour Component 2: Investments Individual l'encadrement technique Pending 2021-03- 2021-04- 2021-05- 2021-06- 2021-12- COFN / C1540 and capacity building in Post Consultant Open 10,000.00 0.00 des agriculteurs sur tanety Implementation 10 24 15 19 16 the selected landscapes Selection dans le paysage de Marovoay Lot 1: Ambolomoty Lot 2: Tsararano Lot 3: Anosinalainolona C 07-20/BOE / Recrutement de 3 consultants individuels Component 2: Investments Individual pour l'encadrement 2020-10- 2020-12- 2021-01- 2021-02- 2021-09- COFN / C1540 and capacity building in Post Consultant Open 10,000.00 0.00 Canceled technique des agriculteurs 30 29 19 23 21 the selected landscapes Selection sur tanety dans le paysage de Marovoay Lot 1: Ambolomoty Lot 2: Tsararano Lot 3: Anosinalainolona. C 08-20/ANJ / Recrutement d'un consultant individuel pour Component 2: Investments Individual 2021-02- 2021-03- 2021-04- 2021-04- 2021-05- la formation du personnel COFN / C1540 and capacity building in Post Consultant Open 2,250.00 0.00 Canceled 10 25 04 24 09 des Ministères au niveau the selected landscapes Selection Régional à la construction et mise en œuvre du SIS (Formation) C 13-20/ANJ / Recrutement des techniciens accompagnateurs dans les Component 2: Investments Individual Under 2021-03- 2021-03- 2021-04- 2021-05- 2021-05- 2021-11- paysages d'Iazafo et de COFN / C1540 and capacity building in Post Consultant Open 115,900.00 0.00 Implementation 03 02 21 01 30 26 Soanierana Ivongo: the selected landscapes Selection Lot 01: 05 techniciens en agriculture Lot 02: 08 techniciens en environnement C 10-20/SOF / Recrutement de Component 2: Investments Individual Consultants individuels 2020-09- 2020-12- 2021-01- 2021-02- 2021-05- COFN / C1540 and capacity building in Post Consultant Open 6,000.00 0.00 Canceled pour l'encadrement et 30 29 19 23 24 the selected landscapes Selection l'appui conseils de proximité aux Paysans Formateurs et aux Paysans adoptants C 05-19/ANJ / Consultant individuel pour appuyer la Component 2: Investments Individual 2021-01- 2021-03- 2021-03- 2021-04- 2021-08- redynamisation COFN / C1540 and capacity building in Post Consultant Open 5,630.00 0.00 Canceled 13 14 25 15 13 duTranoben'ny Tantsaha à the selected landscapes Selection Fenérive Est. Page 13 C 22-20 / CN / Responsable Component 3: Project Individual Environnement et 2020-06- 2020-05- 2020-07- 2020-05- 2020-08- 2020-05- 2020-09- 2022-08- IDA / 59790 Management Coordination Post Consultant Open 48,000.00 0.00 Canceled Foresterie au niveau de la 10 05 29 13 19 15 23 14 and M&E Selection Cellule d’Exécution Régionale du projet : Poste basé à Andapa (Région SAVA) C 23-20/BOE / Recrutement d'un consultant individuel pour les Etudes - contrôle et Component 2: Investments Individual Under 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2021-12- surveillance des travaux de COFN / C1540 and capacity building in Post Consultant Open 9,500.00 0.00 Implementation 16 25 29 20 24 21 réhabilitation des trois the selected landscapes Selection magasins de stockage à la disposition des trois coopératives semencières de Tsararano C 12-20/BOE / Recrutement d'un consultant individuel pour l'étude - contrôle et Component 2: Investments Individual Pending 2021-03- 2021-05- 2021-06- 2021-07- 2021-12- surveillance des travaux de COFN / C1540 and capacity building in Post Consultant Open 2,400.00 0.00 Implementation 23 11 01 06 03 construction de 3 couloirs the selected landscapes Selection de vaccination des bovidés dans les CR d'Ambolomoty, de Tsararano et d'Anosinalainolona C 10-20/ANJ / Recrutement consultant Component 2: Investments Individual individuel pour la formation Pending 2021-07- 2021-09- 2021-09- 2021-10- 2021-10- COFN / C1540 and capacity building in Post Consultant Open 2,925.00 0.00 en GIRE des personnels des Implementation 20 06 16 06 21 the selected landscapes Selection 03 Directions Régionales de tutelles et ceux de la CER C 03-21/CN / Analyse du Component 1: Information Under 2021-05- 2021-05- 2021-06- 2021-05- 2021-09- 2022-03- marché et de la politique COFN / C1540 Post Direct Selection Direct 125,000.00 0.00 and planning Implementation 21 03 10 04 04 03 rizicole à Madagascar. C 04-21/CN / Responsable Agriculture Component 3: Project Individual Under 2021-05- 2021-05- 2021-06- 2021-06- 2021-06- 2021-07- 2022-07- pour la Cellule d’Exécution COFN / C1540 Management Coordination Post Consultant Open 16,000.00 0.00 Implementation 03 03 02 17 12 06 06 Régionale du PADAP BOENY and M&E Selection (Basé à Marovoay). C 02-21/CN / Responsable Component 3: Project Individual Under 2021-03- 2021-03- 2021-04- 2021-05- 2021-04- 2021-05- 2021-05- 2022-08- Environnement et COFN / C1540 Management Coordination Post Consultant Open 16,000.00 10,362.62 Implementation 19 19 18 19 28 21 22 15 Foresterie pour la Cellule and M&E Selection d’Exécution Régionale du PADAP SOFIA (Basé à Bealanana). C 02-21/SAV / Mémoire technique et contrôle- surveillance’ des travaux restant pour la réhabilitation du barrage en Component 2: Investments 2021-05- 2021-05- 2021-06- 2021-08- 2022-01- dur avec avant-canal rive COFN / C1540 and capacity building in Post Direct Selection Direct 18,600.00 0.00 Under Review 21 31 10 04 31 droite et la rénovation des the selected landscapes réseaux hydroagricoles du périmètre Ambodivitagnona sur 370 ha, CR Ambalamanasy II, District Andapa. C 03-21/SAV / Recrutement de 03 Component 2: Investments Individual Under 2021-05- 2021-05- 2021-06- 2021-07- 2021-07- 2022-07- techniciens agricoles pour COFN / C1540 and capacity building in Post Consultant Open 18,500.00 0.00 Implementation 10 12 29 06 19 19 encadrer les Paysans the selected landscapes Selection Formateurs dans le paysage d'Andapa, Région SAVA. C 02-20/SOF / Recrutement de deux (02) Component 2: Investments Individual agents communaux sur 2021-01- 2021-03- 2021-04- 2021-05- 2023-02- COFN / C1540 and capacity building in Post Consultant Open 8,750.00 0.00 Canceled l'approche LIFE : 01 29 20 10 15 24 the selected landscapes Selection Commune Rurale AMBODIAMPANA- 01 Commune Rurale AMBATOSIA C 04-20/SOF / Assistance technique pour Component 2: Investments Individual Pending 2021-07- 2021-10- 2021-10- 2021-11- 2022-03- l'encadrement et appui- COFN / C1540 and capacity building in Post Consultant Open 6,000.00 0.00 Implementation 30 08 29 29 29 conseil de proximité des the selected landscapes Selection Paysans Formateurs et des paysans adoptants C 02-21/SOF / Recrutement d’un consultant individuel pour Component 2: Investments Individual Pending 2021-06- 2021-08- 2021-08- 2021-09- 2021-11- l'étude de l'amélioration du COFN / C1540 and capacity building in Post Consultant Open 4,800.00 0.00 Implementation 28 06 16 09 08 système de production the selected landscapes Selection maraîchère et d'ananas dans les sous-paysages de Bealanana et d'Ambatosia. C 01-21/SOF / Recrutement de 03 consultants individuel pour Component 2: Investments Individual Pending 2021-06- 2021-08- 2021-09- 2021-10- 2022-04- la formation et COFN / C1540 and capacity building in Post Consultant Open 10,000.00 0.00 Implementation 28 16 06 11 09 encadrement de la mise en the selected landscapes Selection place de 12 ateliers d'élevage bovin pilote dans le paysage de Bealanana. C 06-21/CN / Component 3: Project Individual Recrutement d’un Assistant Pending 2021-07- 2021-08- 2021-08- 2021-09- 2022-07- COFN / C1540 Management Coordination Post Consultant Open 8,500.00 0.00 en Informatique du PADAP, Implementation 07 06 16 09 30 and M&E Selection poste basé à : Antananarivo C 12-20/ANJ / Contrôle et surveillance des travaux de réhabilitation des réseaux Component 2: Investments Pending 2021-08- 2021-09- 2021-10- 2022-02- hydroagricoles de la zone COFN / C1540 and capacity building in Post Direct Selection Direct 24,500.00 0.00 Implementation 19 08 12 09 Mahatsara Sud- the selected landscapes Andapatsra, dans la plaine d'Iazafo (Lot 06); District de Vavatenina. C 01-21/ANJ / Recrutement d'un Consultants individuel Component 2: Investments Individual Pending 2022-01- 2022-11- spécialiste en Socio COFN / C1540 and capacity building in Post Consultant Open 23,060.00 0.00 Implementation 05 01 organisation pour appui au the selected landscapes Selection développement de chaîne de valeur girofle dans le paysage d'Iazafo C 04-21/SAV / Recrutement de 3 techniciens agricoles pour Component 2: Investments Individual la sensibilisation et Pending 2021-07- 2021-08- 2021-08- 2021-08- 2022-07- COFN / C1540 and capacity building in Post Consultant Open 14,500.00 0.00 encadrement des paysans Implementation 12 21 24 31 27 the selected landscapes Selection formateurs adoptant l'agroécologie et l'agroforesterie dans le paysage d'Andapa. C 04-21/ANJ / Recrutement d'un Consultants individuel Component 2: Investments Individual 2021-04- 2021-06- 2021-07- 2021-07- 2022-01- spécialiste en Socio COFN / C1540 and capacity building in Post Consultant Open 23,030.00 0.00 Canceled 30 23 03 23 19 organisation pour appui au the selected landscapes Selection développement de chaîne de valeur girofle dans le paysage de Soanierana Ivongo C 03-21/ANJ / Recrutement de Consultant individuel spécialiste en Component 2: Investments Individual 2021-03- 2021-05- 2021-06- 2021-07- 2022-05- Distillation pour appui au COFN / C1540 and capacity building in Post Consultant Open 46,060.00 0.00 Canceled 18 11 01 06 02 développement de chaîne the selected landscapes Selection de valeur girofle dans les paysages d’Iazafo et de Soanierana Ivongo C 02-21/ANJ / Recrutement de Consultant individuel spécialiste en Component 2: Investments Individual 2021-03- 2021-05- 2021-06- 2021-07- 2022-05- Chaudronnerie pour appui COFN / C1540 and capacity building in Post Consultant Open 46,060.00 0.00 Canceled 18 11 01 06 02 au développement de the selected landscapes Selection chaîne de valeur girofle dans les paysages d’Iazafo et de Soanierana Ivongo C 13-20/BOE / Recrutement de 03 consultants individuels Component 2: Investments Individual pour l'encadrement 2021-02- 2021-03- 2021-04- 2021-05- 2021-07- COFN / C1540 and capacity building in Post Consultant Open 12,600.00 0.00 Canceled technique et suivi de 02 28 18 23 22 the selected landscapes Selection l'adoption du paquet technique par les riziculteurs dans les CR d'Ambolomoty, de Tsararano et C 05-20/BOE / d'Anosinalainolona Recrutement de deux (02) agents communaux pour l'approche LIFE dans le Component 2: Investments Individual 2021-06- 2021-07- 2021-08- 2021-09- 2023-09- district de Marovoay, COFN / C1540 and capacity building in Post Consultant Open 8,100.00 0.00 Canceled 09 28 12 08 18 Région Boeny. the selected landscapes Selection Lot 1: Commune rurale de Tsararano Lot 2: Commune rurale d' Anosinalainolona Page 14 PROCUREMENT Serbia : Serbia Competitiveness and Jobs PLAN General Information Country: Serbia Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152104 GPN Date: Project Name: Serbia Competitiveness and Jobs Loan / Credit No: IBRD / 85280 Public Policy Secretariat PIU Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual B.G.1.1/ IT Equipment / IT Policy planning, monitoring, Request for Equipment and Software for IBRD / 85280 Prior Open - International 17,021.33 Signed 2016-10-19 and coordination Quotations the PPS - REBID NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Consultant 2A.2.5.1. / Sector Policy Policy planning, monitoring, IBRD / 85280 Prior Qualification Open - International 209,759.72 Signed 2016-09-02 2016-09-08 Development and coordination Selection 4A.4.1. / Design and development of methodology Consultant Policy planning, monitoring, for labor market analysis, IBRD / 85280 Post Qualification Open - International 216,175.07 Signed 2020-03-20 2020-03-20 2020-04-08 2020-04-02 2020-05-04 2020-07-08 2020-05-29 2020-09-28 2020-06-19 2020-09-28 2021-06-19 and coordination profiling, ALMP design and Selection piloting 3A.3.1. / Design and Policy planning, monitoring, Quality And Cost- Implementation of RDIs IBRD / 85280 Post Open - International 364,960.93 Signed 2019-10-16 2019-10-16 2019-11-06 2019-12-20 2020-03-10 2020-01-17 2020-05-11 2020-02-16 2020-07-17 2020-03-22 2020-07-31 2020-04-26 2020-09-03 2021-04-26 and coordination Based Selection External Performance Review INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual B.1.4 / Finance Specialist with Policy planning, monitoring, IBRD / 85280 Prior Consultant Open 150,499.64 Signed 2016-03-01 2016-03-01 the PIU and coordination Selection Head of the Project Implementation Unit / Head of Policy planning, monitoring, IBRD / 85280 Prior Direct Selection Direct 94,003.80 Signed 2017-02-28 the Project Implementation and coordination Unit B.1.4. - rebid / Finance Individual Policy planning, monitoring, Specialist in the Project IBRD / 85280 Prior Consultant Open 92,798.35 Signed 2017-07-13 2017-07-14 and coordination Implementation Unit Selection 3A.3.4 / Data support senior Policy planning, monitoring, IBRD / 85280 Prior Direct Selection Direct 64,221.87 Signed 2019-04-01 expert for M&E and coordination B.1.11 / Team Leader for Policy planning, monitoring, IBRD / 85280 Prior Direct Selection Direct 126,888.76 Signed 2019-01-24 Experts and coordination Policy planning, monitoring, B.1.1. / New PIU Head IBRD / 85280 Prior Direct Selection Direct 82,010.44 Signed 2019-11-04 2019-11-14 2019-11-22 2019-11-22 2021-06-30 and coordination 3A.3.17. / Specialist for consultative process for developing common and Policy planning, monitoring, IBRD / 85280 Post Direct Selection Direct 16,029.55 Signed 2020-02-10 2020-02-07 2020-02-20 2020-02-13 2020-02-28 2020-02-19 2021-01-05 compatible measures for and coordination industrial and scientific reform policies 3A.3.18. / Specialist for consultative process for developing common and Policy planning, monitoring, IBRD / 85280 Post Direct Selection Direct 16,029.55 Signed 2020-02-10 2020-02-07 2020-02-20 2020-02-13 2020-02-28 2020-02-19 2020-12-31 compatible measures for and coordination industrial and scientific reform policies Page 1 3A.3.19. / Specialist for consultative process for developing common and Policy planning, monitoring, IBRD / 85280 Post Direct Selection Direct 16,029.55 Signed 2020-02-10 2020-02-07 2020-02-20 2020-02-13 2020-02-28 2020-02-24 2020-12-31 compatible measures for and coordination industrial and scientific reform policies 3A.3.20. / Specialist for consultative process for developing common and Policy planning, monitoring, IBRD / 85280 Post Direct Selection Direct 16,029.55 Signed 2020-02-10 2020-02-07 2020-02-20 2020-02-13 2020-02-28 2020-02-19 2020-12-31 compatible measures for and coordination industrial and scientific reform policies 3A.3.21. / Specialist for consultative process for developing common and Policy planning, monitoring, IBRD / 85280 Post Direct Selection Direct 16,029.55 Signed 2020-02-10 2020-02-07 2020-02-20 2020-02-13 2020-02-28 2020-02-19 2020-12-31 compatible measures for and coordination industrial and scientific reform policies 3A.3.22. / Specialist for consultative process for developing common and Policy planning, monitoring, IBRD / 85280 Post Direct Selection Direct 16,029.55 Signed 2020-02-10 2020-02-07 2020-02-20 2020-02-13 2020-02-28 2020-02-19 2020-12-31 compatible measures for and coordination industrial and scientific reform policies 2A.2.19.1. / Expert for peer- based capacity building for Policy planning, monitoring, implementation of investment IBRD / 85280 Post Direct Selection Direct 29,342.00 Signed 2020-08-11 2020-08-24 2020-08-25 2020-08-25 2020-09-13 2020-09-09 2020-12-12 and coordination and export promotion strategic framework in MoE 4A.4.2. / Impact evaluation Individual Policy planning, monitoring, Under expert on Active Labor Market IBRD / 85280 Post Consultant Limited 0.00 2021-02-17 2021-02-12 2021-02-19 2021-02-18 2021-02-28 2021-03-05 2021-06-30 and coordination Implementation Programs (ALMPs) Selection 3A.3.15.1. / Expert for the continuation of consultative process for economic and Policy planning, monitoring, Under scientific reform policies and IBRD / 85280 Post Direct Selection Direct 0.00 2021-05-21 2021-05-18 2021-05-29 2021-05-21 2021-06-01 2021-06-30 and coordination Implementation the framework for the implementation of the S4 (Ref. No. 3A.3.15-1) Page 2 PROCUREMENT PLAN (Textual Part) Project information: Sri Lanka – Water Resources Management Project-P-166865 Project Implementation agency: Ministry of Mahaweli Development and Environment Date of the Procurement Plan: 24 June, 2019 Period covered by this Procurement Plan: 15 March 2020-30 Sep. 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with the Procurement Regulations for IPF Borrowers (July 2016, revised November 2017) (“Procurement Regulations”), when approaching the national market, as agreed in the Procurement Plan tables in STEP, the country’s own procurement procedures may be used. When the Borrower, for the procurement of goods, works and non-consulting services, uses its own national open competitive procurement arrangements as set forth in Sri Lanka’s Procurement Guidelines 2006, such arrangements shall be subject to paragraph 5.4 of the Bank’s Procurement Regulations and the following conditions: 1. Only bidding documents acceptable to the Bank shall be used for all national open competitive procurement. 2. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 3. The eligibility of bidders shall be as defined under Section III of the World Bank Procurement Regulations for IPF Borrowers (Procurement Regulations): accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 4. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. PROCUREMENT Sri Lanka : Sri Lanka Integrated Watershed and Water Resources Management Project PLAN General Information Country: Sri Lanka Bank’s Approval Date of the Original Procurement Plan: 2019-06-28 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166865 GPN Date: 2020-07-28 Project Name: Sri Lanka Integrated Watershed and Water Resources Management Project Loan / Credit No: / , IDA / 66190, IDA / 66210 M Executing Agency(ies): inistry of Mahaweli Development and Environment WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LK-MOMDE-117185-CW- Component 4: Project Request for Single Stage - One 2019-11- RFQ / Refurbishment of PMU / Post Limited 45,311.47 38,887.42 Signed 2019-06-26 2019-06-18 2019-08-14 2019-09-04 Management Quotations Envelope 12 office (IWWRMP/PP/WORKS/01) LK-MOMDE-123620-CW-RFB / Improvements to Unnichchai LB main channel from stn Component 2: Infrastructure Single Stage - One 2021-03- / Post Request for Bids Open - National 923,033.71 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 0+000 to stn 13+725 Improvements Envelope 18 (IWWRMP- 2/WORKS/ID/OCBN/04-1) LK-MOMDE-124032-CW-RFB / Improvements to Unnichchai RB main channel from stn Component 2: Infrastructure Single Stage - One 2021-03- / Post Request for Bids Open - National 906,741.57 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 0+000 to stn 4+950 ( Improvements Envelope 01 IWWRMP- 2/WORKS/ID/OCBN/04-2 ) LK-MOMDE-124217-CW-RFB / Improvements to Unnichchai RB main channel from stn Component 2: Infrastructure Single Stage - One 2021-03- / Post Request for Bids Open - National 887,640.45 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 4+950 to stn 10+000 ( Improvements Envelope 01 IWWRMP- 2/WORKS/ID/OCBN/04-3 ) LK-MOMDE-124409-CW-RFB / Rehabilititation of Panama Component 2: Infrastructure Single Stage - One 2021-03- / Post Request for Bids Open - National 342,696.63 0.00 Canceled 2019-11-26 2019-12-10 2019-12-31 2020-01-30 2020-03-05 Tank ( IWWRMP- Improvements Envelope 05 2/WORKS/ID/OCBN/07 ) LK-MOMDE-124659-CW-RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One 2021-03- Peramaduwa Scheme ( / Post Request for Bids Open - National 898,876.40 0.00 Canceled 2019-12-20 2020-01-03 2020-01-24 2020-02-23 2020-03-29 Improvements Envelope 29 IWWRMP- 2/WORKS/ID/OCBN/17 ) LK-MOMDE-124666-CW-RFB / Improvements Viyadikulam Component 2: Infrastructure Single Stage - One 2021-03- / Post Request for Bids Open - National 950,185.39 0.00 Canceled 2019-12-20 2020-01-03 2020-01-24 2020-02-23 2020-03-29 Spill ( IWWRMP- Improvements Envelope 29 2/WORKS/ID/OCBN/18-2 ) LK-MOMDE-124667-CW-RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One 2021-05- / Post Request for Bids Open - National 325,505.62 0.00 Canceled 2020-01-24 2020-02-07 2020-02-28 2020-03-29 2020-05-03 Abakolawewa Tank ( IWWRMP- Improvements Envelope 03 2/WORKS/ID/OCBN/19 ) LK-MOMDE-124683-CW-RFB / Rehabilititation of Karawita Component 2: Infrastructure Single Stage - One 2021-03- / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2019-11-25 2019-12-09 2019-12-30 2020-01-29 2020-03-04 tank ( IWWRMP- Improvements Envelope 04 2/WORKS/ID/OCBN/20 ) LK-MOMDE-125489-CW-RFB / Rehabilititation of Madiyawa Component 2: Infrastructure Single Stage - One 2021-04- / Post Request for Bids Open - National 464,775.28 0.00 Canceled 2019-12-23 2020-01-06 2020-01-27 2020-02-26 2020-04-01 Tank ( IWWRMP- Improvements Envelope 01 2/WORKS/ID/OCBN/23 ) LK-MOMDE-125508-CW-RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One 2021-04- / Post Request for Bids Open - National 280,898.88 0.00 Canceled 2019-12-27 2020-01-10 2020-01-31 2020-03-01 2020-04-05 Mannankatiya Tank ( IWWRMP- Improvements Envelope 05 2/WORKS/ID/OCBN/27 ) LK-MOMDE-125511-CW-RFB / Rehabilititation of Main Component 2: Infrastructure Single Stage - One 2021-03- Canal of Kimbulawana Oya / Post Request for Bids Open - National 347,780.90 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 Improvements Envelope 18 Scheme (LBMC) ( IWWRMP- 2/WORKS/ID/OCBN/28-1 ) LK-MOMDE-125513-CW-RFB / Rehabilititation of Main Component 2: Infrastructure Single Stage - One 2021-03- Canal of Kimbulawana Oya / Post Request for Bids Open - National 262,859.69 0.00 Canceled 2019-12-09 2019-12-10 2019-12-31 2020-01-30 2020-03-05 Improvements Envelope 05 Scheme (RBMC) ( IWWRMP- 2/WORKS/ID/OCBN/28-2) LK-MOMDE-125515-CW-RFB / Rehabilititation of Maha Component 2: Infrastructure Single Stage - One 2021-03- / Post Request for Bids Open - National 896,067.42 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 Andara Wewa ( IWWRMP- Improvements Envelope 18 2/WORKS/ID/OCBN/29 ) LK-MOMDE-125834-CW-RFB / Improvement of Spillway Tail Component 2: Infrastructure Single Stage - One 2021-03- Canal of Kotmale Dam ( / Post Request for Bids Open - National 369,101.12 0.00 Canceled 2019-11-26 2019-12-10 2019-12-31 2020-01-30 2020-03-05 Improvements Envelope 05 IWWRMP- 2/WORKS/MASL/OCBN/101 ) LK-MOMDE-125839-CW-RFB / Repairs to gates of irrigation Component 2: Infrastructure Single Stage - One 2021-09- structures in Kalawewa Left / Post Request for Bids Open - National 337,078.65 0.00 Canceled 2019-12-06 2019-12-20 2020-01-10 2020-02-09 2020-03-15 Improvements Envelope 16 Bank main canal (IWWRMP- 2/WORKS/MASL//OCBN/105) Page 1 LK-MOMDE-125846-CW-RFB / Reconstruction of Muthuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2020-11- Muthuiyankaddu Division - / Post Request for Bids Open - National 365,168.54 0.00 Canceled 2019-11-15 2019-11-29 2019-12-20 2020-01-19 2020-02-23 Improvements Envelope 19 Package 01 (RB/Track 03) ( IWWRMP- 2/WORKS/NPC/OCBN/200-1 ) LK-MOMDE-125994-CW-RFB / Reconstruction of Muthuiyankaddu LB Canal - Component 2: Infrastructure Single Stage - One 2020-11- / Post Request for Bids Open - National 337,078.65 0.00 Canceled 2020-02-14 2020-02-28 2020-03-20 2020-04-19 2020-05-24 Muthuiyankaddu Division - Improvements Envelope 20 (LB/Track 02) ( IWWRMP- 2/WORKS/NPC/OCBN/200-6 ) LK-MOMDE-125995-CW-RFB / Reconstruction of Muthuiyankaddu LB Canal - Component 2: Infrastructure Single Stage - One 2021-02- / Post Request for Bids Open - National 196,629.21 0.00 Canceled 2020-02-14 2020-02-28 2020-03-20 2020-04-19 2020-05-24 Muthuiyankaddu Division - Improvements Envelope 18 (LB/Track 04) ( IWWRMP- 2/WORKS/NPC/OCBN/200-7 ) LK-MOMDE-126158-CW-RFB / Reconstruction of Muthuiyankaddu LB Canal - Component 2: Infrastructure Single Stage - One 2021-10- / Post Request for Bids Open - National 449,438.20 0.00 Canceled 2020-10-20 2020-11-03 2020-11-24 2020-12-24 2021-01-28 Muthuiyankaddu Division - Improvements Envelope 25 (LB/Track 01) (IWWRMP- 2/WORKS/NPC/OCBN/200-9) LK-MOMDE-126330-CW-RFB / Reconstruction of Muthuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2021-04- Muthuiyankaddu Division - / Post Request for Bids Open - National 674,157.30 0.00 Canceled 2020-04-17 2020-05-01 2020-05-22 2020-06-21 2020-07-26 Improvements Envelope 22 (RB/Track 04) ( IWWRMP- 2/WORKS/NPC/OCBN/200-10 ) LK-MOMDE-126332-CW-RFB / Reconstruction of Muthuiyankaddu LB Canal - Component 2: Infrastructure Single Stage - One 2021-05- Muthuiyankaddu Division - / Post Request for Bids Open - National 561,797.75 0.00 Canceled 2020-05-17 2020-05-31 2020-06-21 2020-07-21 2020-08-25 Improvements Envelope 22 (LB/Track 03) ( IWWRMP- 2/WORKS/NPC/OCBN/200- 11) LK-MOMDE-126333-CW-RFB / Reconstruction of Muthuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2021-05- Muthuiyankaddu Division - / Post Request for Bids Open - National 146,067.42 0.00 Canceled 2020-05-15 2020-05-29 2020-06-19 2020-07-19 2020-08-23 Improvements Envelope 20 (RB/Track 08) (IWWRMP- 2/WORKS/NPC/OCBN/200- 12) LK-MOMDE-126337-CW-RFB / Improvements of Muthuiyankaddu RB Main Component 2: Infrastructure Single Stage - One 2021-05- Canal - Muthuiyankaddu / Post Request for Bids Open - National 84,269.66 0.00 Canceled 2020-05-20 2020-06-03 2020-06-24 2020-07-24 2020-08-28 Improvements Envelope 25 Division ( IWWRMP- 2/WORKS/NPC/OCBN/200-13 ) LK-MOMDE-126338-CW-RFB / Improvements of Muthuiyankaddu LB Main Component 2: Infrastructure Single Stage - One 2021-07- Canal - Muthuiyankaddu / Post Request for Bids Open - National 84,269.66 0.00 Canceled 2020-07-20 2020-08-03 2020-08-24 2020-09-23 2020-10-28 Improvements Envelope 25 Division ( IWWRMP- 2/WORKS/NPC/OCBN/200-14 ) LK-MOMDE-126345-CW-RFB / Rehabilitation of Kalmadu Component 2: Infrastructure Single Stage - One 2020-11- / Post Request for Bids Open - National 1,404,494.38 0.00 Canceled 2019-11-18 2019-12-02 2019-12-23 2020-01-22 2020-02-26 Scheme Headworks ( IWWRMP- Improvements Envelope 22 2/WORKS/NPC/OCBN/201-1 ) LK-MOMDE-126347-CW-RFB / Rehabilitation of channel to kandawalai under RB cannel Component 2: Infrastructure Single Stage - One 2022-08- / Post Request for Bids Open - National 449,438.20 0.00 Canceled 2021-08-23 2021-09-06 2021-09-27 2021-10-27 2021-12-01 under Kalmadu Scheme ( Improvements Envelope 28 IWWRMP- 2/WORKS/NPC/OCBN/201-2 ) LK-MOMDE-126353-CW-RFB / Rehabilitation of channel to Puliyampokkanai under RB Component 2: Infrastructure Single Stage - One 2021-10- / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-10-20 2020-11-03 2020-11-24 2020-12-24 2021-01-28 cannel under Kalmadu Improvements Envelope 25 Scheme ( IWWRMP- 2/WORKS/NPC/OCBN/201-3 ) LK-MOMDE-126367-CW-RFB / Improvements of Spill & Component 2: Infrastructure Single Stage - One 2021-10- spilltail under Kalmadu / Post Request for Bids Open - National 337,078.65 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 Improvements Envelope 21 Scheme ( IWWRMP- 2/WORKS/NPC/OCBN/201-5 ) LK-MOMDE-126371-CW-RFB / Rehabilitation of akkarayan kulam channel to Component 2: Infrastructure Single Stage - One 2021-02- / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2020-02-14 2020-02-28 2020-03-20 2020-04-19 2020-05-24 kannagipuram under LB Improvements Envelope 18 cannel ( IWWRMP- 2/WORKS/NPC/OCBN/202-1 ) LK-MOMDE-126376-CW-RFB / Rehabilitation of akkarayan kulam channel to Akkarayan Component 2: Infrastructure Single Stage - One 2021-10- / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 under LB cannel & lift Improvements Envelope 21 irrigation ( IWWRMP- 2/WORKS/NPC/OCBN/202-2 ) LK-MOMDE-126378-CW-RFB / Rehabilitation of akkarayan Component 2: Infrastructure Single Stage - One 2021-10- / Post Request for Bids Open - National 449,438.20 0.00 Canceled 2020-09-28 2020-10-12 2020-11-02 2020-12-02 2021-01-06 kulam RB cannel ( IWWRMP- Improvements Envelope 03 2/WORKS/NPC/OCBN/202-3 ) Page 2 LK-MOMDE-126387-CW-RFB / Rehabilitation of akkarayan Component 2: Infrastructure Single Stage - One 2021-10- kulam spill & spilltail channel ( / Post Request for Bids Open - National 449,438.20 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 Improvements Envelope 21 IWWRMP- 2/WORKS/NPC/OCBN/202-5 ) LK-MOMDE-126390-CW-RFB / Rehabilitation of Headworks Component 2: Infrastructure Single Stage - One 2021-10- under Piramanthalaru Scheme / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-09-28 2020-10-12 2020-11-02 2020-12-02 2021-01-06 Improvements Envelope 03 ( IWWRMP- 2/WORKS/NPC/OCBN/203-1 ) LK-MOMDE-126391-CW-RFB / Rehabilitation of Downstream under Component 2: Infrastructure Single Stage - One 2020-11- / Post Request for Bids Open - National 112,359.55 0.00 Canceled 2019-11-18 2019-12-02 2019-12-23 2020-01-22 2020-02-26 Piramanthalaru Irrigation Improvements Envelope 22 Scheme (phase 01) (IWWRMP- 2/WORKS/NPC/OCBN/203-2) LK-MOMDE-126392-CW-RFB / Rehabilitation of Downstream under Component 2: Infrastructure Single Stage - One 2021-09- / Post Request for Bids Open - National 112,359.55 0.00 Canceled 2020-09-21 2020-10-05 2020-10-26 2020-11-25 2020-12-30 Piramanthalaru Irrigation Improvements Envelope 26 Scheme (phase 02) ( IWWRMP- 2/WORKS/NPC/OCBN/203-3 ) LK-MOMDE-126396-CW-RFB / Rehabilitation of Headworks Component 2: Infrastructure Single Stage - One 2021-10- under Kanagambikai Irrigation / Post Request for Bids Open - National 196,629.21 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 Improvements Envelope 21 Scheme (IWWRMP- 2/WORKS/NPC/OCBN/204-1) LK-MOMDE-126400-CW-RFB / Rehabilitation of Downstream under Component 2: Infrastructure Single Stage - One 2020-11- / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 Kanagambikai Scheme ( Improvements Envelope 26 IWWRMP- 2/WORKS/NPC/OCBN/204-2 ) LK-MOMDE-126410-CW-RFB / Rehabilitation of Head works Component 2: Infrastructure Single Stage - One 2020-12- of Kudamuruddy Tank ( / Post Request for Bids Open - National 421,348.31 0.00 Canceled 2019-12-19 2020-01-02 2020-01-23 2020-02-22 2020-03-28 Improvements Envelope 23 IWWRMP- 2/WORKS/NPC/OCBN/206-1) LK-MOMDE-126412-CW-RFB / Rehabilitation of Downstream under Component 2: Infrastructure Single Stage - One 2021-10- / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-09-28 2020-10-12 2020-11-02 2020-12-02 2021-01-06 Kudamuruddy Tank Irrigation Improvements Envelope 03 Scheme ( IWWRMP- 2/WORKS/NPC/OCBN/206-2) LK-MOMDE-126413-CW-RFB / Rehabilitation of Head works Component 2: Infrastructure Single Stage - One 2020-12- of Kariyalai Nagapaduwan / Post Request for Bids Open - National 1,123,595.51 0.00 Canceled 2019-12-16 2019-12-30 2020-01-20 2020-02-19 2020-03-25 Improvements Envelope 20 Tank ( IWWRMP- 2/WORKS/NPC/OCBN/207-1 ) LK-MOMDE-126416-CW-RFB / Rehabilitation of LB cannel Component 2: Infrastructure Single Stage - One 2021-10- under Kariyalai Nagapaduwan / Post Request for Bids Open - National 365,168.54 0.00 Canceled 2020-10-20 2020-11-03 2020-11-24 2020-12-24 2021-01-28 Improvements Envelope 25 Tank (IWWRMP- 2/WORKS/NPC/OCBN/207-2) LK-MOMDE-126417-CW-RFB / Rehabilitation of RB cannel Component 2: Infrastructure Single Stage - One 2021-10- under Kariyalai Nagapaduwan / Post Request for Bids Open - National 308,988.76 0.00 Canceled 2020-10-20 2020-11-03 2020-11-24 2020-12-24 2021-01-28 Improvements Envelope 25 Tank ( IWWRMP- 2/WORKS/NPC/OCBN/207-3 ) LK-MOMDE-126418-CW-RFB / Rehabilitation of Downstream under Vaneri Component 2: Infrastructure Single Stage - One 2021-10- / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-09-28 2020-10-12 2020-11-02 2020-12-02 2021-01-06 kulam Irrigation Scheme ( Improvements Envelope 03 IWWRMP- 2/WORKS/NPC/OCBN/208-1 ) LK-MOMDE-126420-CW-RFB / Rehabilitation of Head works Component 2: Infrastructure Single Stage - One 2021-10- / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 of Vaneri kulam ( IWWRMP- Improvements Envelope 21 2/WORKS/NPC/OCBN/208-2 ) LK-MOMDE-126422-CW-RFB / Rehabilitation of Dowstream infrastructure in Component 2: Infrastructure Single Stage - One 2020-11- / Post Request for Bids Open - National 112,359.55 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 Periyapandivirichan Kulam ( Improvements Envelope 26 IWWRMP- 2/WORKS/NPC/OCBN/209 ) LK-MOMDE-126382-CW-RFB / Rehabilitation of akkarayan Component 2: Infrastructure Single Stage - One 2022-07- / Post Request for Bids Open - National 842,696.63 0.00 Canceled 2021-07-16 2021-07-30 2021-08-20 2021-09-19 2021-10-24 kulam Headworks ( IWWRMP- Improvements Envelope 21 2/WORKS/NPC/OCBN/202-4 ) LK-MOMDE-163016-CW-RFB / Reconstruction of Muthuiyankaddu LB Canal - Component 2: Infrastructure Single Stage - One 2022-02- / Post Request for Bids Open - National 589,887.64 0.00 Canceled 2021-02-16 2021-03-02 2021-03-23 2021-04-22 2021-05-27 Muthuiyankaddu Division - Improvements Envelope 21 (LB/Track 01) (IWWRMP- 2/WORKS/NPC/OCBN/200-9) LK-MOMDE-126361-CW-RFB / Rehabilitation of channel to kalmadu nagar under LB Component 2: Infrastructure Single Stage - One 2022-01- / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2021-01-10 2021-01-24 2021-02-14 2021-03-16 2021-04-20 cannel under Kalmadu Improvements Envelope 15 Scheme ( IWWRMP- 2/WORKS/NPC/OCBN/201-4 ) LK-MOMDE-163051-CW-RFB / Rehablitation of tank Bund Pending (0.8km) including Rip Rap, Component 2: Infrastructure Single Stage - One 2024-03- IDA / 66210 Post Request for Bids Open - National 505,617.98 0.00 Implementat 2021-05-11 2021-12-07 2022-01-04 2022-02-03 2022-03-10 Spill and both sluice to Improvements Envelope 09 ion Meiyankal Tank (IWWRMP- 2/WORKS/EPC/OCBN/300) Page 3 LK-MOMDE-163052-CW-RFB / Rehabilitation of channels of Chadayanthalawa anicut, Kadukkayan anicut, Pending Component 2: Infrastructure Single Stage - One 2024-03- Neendakari anicut, and IDA / 66210 Post Request for Bids Open - National 226,320.22 0.00 Implementat 2021-05-17 2021-12-13 2022-01-10 2022-02-09 2022-03-16 Improvements Envelope 15 Weeramunai anicut in ion Chadayanthalawa Scheme (IWWRMP- 2/WORKS/EPC/OCBN/301) LK-MOMDE-163053-CW-RFB / Rehabilitation of Saliyapura Pending Component 2: Infrastructure Single Stage - One 2023-09- anicut of Paravipanchan IDA / 66210 Post Request for Bids Open - National 121,629.21 0.00 Implementat 2021-05-19 2021-12-15 2022-01-12 2022-02-11 2022-03-18 Improvements Envelope 09 scheme (IWWRMP- ion 2/WORKS/EPC/OCBN/302) LK-MOMDE-163054-CW-RFB / Improvements to canal Pending System (18km) inculuding Component 2: Infrastructure Single Stage - One 2024-03- IDA / 66210 Post Request for Bids Open - National 561,797.75 0.00 Implementat 2021-05-20 2021-12-16 2022-01-13 2022-02-12 2022-03-19 structures of Puluganawai- Improvements Envelope 18 ion Kankaniyar scheme (IWWRMP- 2/WORKS/EPC/OCBN/303) LK-MOMDE-163055-CW-RFB / Improvements of tank bund(1.5km), including Rip Pending Component 2: Infrastructure Single Stage - One 2024-03- Rap and Sluice Structure to IDA / 66210 Post Request for Bids Open - National 168,539.33 0.00 Implementat 2021-05-03 2021-11-29 2021-12-27 2022-01-26 2022-03-02 Improvements Envelope 01 Puluganawai-Kankaniyar ion scheme (IWWRMP- 2/WORKS/EPC/OCBN/305) LK-MOMDE-224661-CW-RFB / Rehabilitation of Pending Muththuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2022-07- IDA / 66210 Post Request for Bids Open - National 365,168.54 0.00 Implementat 2021-03-15 2021-07-13 2021-08-10 2021-09-09 2021-10-14 Muththuiyankaddu Division - Improvements Envelope 11 ion (RB/Track 03) (IWWRMP- 2/WORKS/NPC/OCBN/200-1) LK-MOMDE-125851-CW-RFB / Rehabilitation of Pending Muthuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2022-07- IDA / 66210 Post Request for Bids Open - National 325,842.70 0.00 Implementat 2019-11-15 2021-07-08 2021-08-05 2021-09-04 2021-10-09 Muthuiyankaddu Division - Improvements Envelope 06 ion (RB/Track 07) ( IWWRMP- 2/WORKS/NPC/OCBN/200-2 ) LK-MOMDE-125854-CW-RFB / Rehabilitation of Pending Muthuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2022-11- IDA / 66210 Post Request for Bids Open - National 617,977.53 0.00 Implementat 2019-11-15 2021-08-12 2021-09-09 2021-10-09 2021-11-13 Muthuiyankaddu Division - Improvements Envelope 13 ion (RB/Track 05) ( IWWRMP- 2/WORKS/NPC/OCBN/200-3 ) LK-MOMDE-125855-CW-RFB / Rehabilitation of Pending Muthuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2023-05- IDA / 66210 Post Request for Bids Open - National 634,831.46 0.00 Implementat 2020-01-20 2021-08-11 2021-09-08 2021-10-08 2021-11-12 Muthuiyankaddu Division - Improvements Envelope 06 ion (RB/Track 01) ( IWWRMP- 2/WORKS/NPC/OCBN/200-4) LK-MOMDE-125856-CW-RFB / Rehabilitation of Pending Muthuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2022-08- IDA / 66210 Post Request for Bids Open - National 831,460.67 0.00 Implementat 2020-01-20 2021-08-19 2021-09-16 2021-10-16 2021-11-20 Muthuiyankaddu Division - Improvements Envelope 17 ion (RB/Track 02) ( IWWRMP- 2/WORKS/NPC/OCBN/200-5) LK-MOMDE-126155-CW-RFB / Rehabilitation of Pending Muththuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One 2022-08- IDA / 66210 Post Request for Bids Open - National 464,831.46 0.00 Implementat 2021-03-15 2021-08-16 2021-09-13 2021-10-13 2021-11-17 Muththuiyankaddu Division - Improvements Envelope 14 ion (RB/Track 06) (IWWRMP- 2/WORKS/NPC/OCBN/200-6) LK-MOMDE-163023-CW-RFB / Rehabilitation of Pending Muthuiyankaddu LB Canal - Component 2: Infrastructure Single Stage - One 2022-12- IDA / 66210 Post Request for Bids Open - National 589,887.64 0.00 Implementat 2021-06-16 2021-12-13 2022-01-10 2022-02-09 2022-03-16 Muthuiyankaddu Division - Improvements Envelope 11 ion (LB/Track 03) ( IWWRMP- 2/WORKS/NPC/OCBN/200-7) LK-MOMDE-163045-CW-RFB Pending / Rehabilitation of Kalmadu Component 2: Infrastructure Single Stage - One 2023-11- IDA / 66210 Post Request for Bids Open - National 1,619,101.12 0.00 Implementat 2020-11-18 2021-08-16 2021-09-13 2021-10-13 2021-11-17 Scheme Headworks (IWWRMP- Improvements Envelope 17 ion 2/WORKS/NPC/OCBN/201-1) LK-MOMDE-163041-CW-RFB / Improvements of Spill & spill Pending Component 2: Infrastructure Single Stage - One 2022-11- tail under Kalmadu Scheme ( IDA / 66210 Post Request for Bids Open - National 291,011.24 0.00 Implementat 2020-11-16 2021-08-13 2021-09-10 2021-10-10 2021-11-14 Improvements Envelope 14 IWWRMP- ion 2/WORKS/NPC/OCBN/201-2 ) LK-MOMDE-163038-CW-RFB / Rehabilitation of Pending Downstream under Component 2: Infrastructure Single Stage - One 2022-08- IDA / 66210 Post Request for Bids Open - National 139,213.48 0.00 Implementat 2020-11-18 2021-08-16 2021-09-13 2021-10-13 2021-11-17 Piramanthalaru Irrigation Improvements Envelope 14 ion Scheme (phase 01) (IWWRMP- 2/WORKS/NPC/OCBN/203-2) LK-MOMDE-126401-CW-RFB Pending / Rehabilitation of Head works Component 2: Infrastructure Single Stage - One 2023-03- IDA / 66210 Post Request for Bids Open - National 1,500,000.00 0.00 Implementat 2021-07-01 2021-12-28 2022-01-25 2022-02-24 2022-03-31 in Periyamdu Tank ( IWWRMP- Improvements Envelope 31 ion 2/WORKS/NPC/OCBN/205 ) LK-MOMDE-163044-CW-RFB / Rehabilitation of Head works Pending Component 2: Infrastructure Single Stage - One 2023-04- of Kudamuruddy Tank ( IDA / 66210 Post Request for Bids Open - National 510,000.00 0.00 Implementat 2021-08-13 2022-01-10 2022-02-07 2022-03-09 2022-04-13 Improvements Envelope 13 IWWRMP- ion 2/WORKS/NPC/OCBN/206) LK-MOMDE-163059-CW-RFB / Rehabilitation of Head works Pending and Downstream Component 2: Infrastructure Single Stage - One 2023-05- IDA / 66210 Post Request for Bids Open - National 510,000.00 0.00 Implementat 2021-09-13 2022-02-10 2022-03-10 2022-04-09 2022-05-14 infrastructure of Kariyalai Improvements Envelope 15 ion Nagapaduwan Tank (IWWRMP- 2/WORKS/NPC/OCBN/207) Page 4 LK-MOMDE-163031-CW-RFB / Improvement of Spillway Tail Pending Canal and removing rock Component 2: Infrastructure Single Stage - One 2023-03- IDA / 66210 Post Request for Bids Open - National 842,696.63 0.00 Implementat 2020-06-29 2021-12-01 2021-12-29 2022-01-28 2022-03-04 boulders in Kotmale Dam ( Improvements Envelope 04 ion IWWRMP- 2/WORKS/MASL/OCBN/101 ) LK-MOMDE-163066-CW-RFB / Immediate improvement of Pending upper phephary of Polgolla Component 2: Infrastructure Single Stage - One 2023-02- IDA / 66210 Post Request for Bids Open - National 786,516.85 0.00 Implementat 2021-10-04 2021-11-08 2021-12-06 2022-01-05 2022-02-09 Dam - Phase I (IWWRMP- Improvements Envelope 09 ion 2/WORKS/MASL/OCBN/106- 1) LK-MOMDE-123572-CW-RFB / Improvements to Pending Bathalagoda Anicut & Anicut Component 2: Infrastructure Single Stage - One 2022-12- IDA / 66210 Post Request for Bids Open - National 397,191.01 0.00 Implementat 2019-11-15 2021-09-21 2021-10-19 2021-11-18 2021-12-23 inlet CHL road from CH0 to Improvements Envelope 23 ion 3+775 (IWWRMP- 2/WORKS/ID/OCBN/01-1) LK-MOMDE-123594-CW-RFB / Improvement to Bathalagoda Pending Component 2: Infrastructure Single Stage - One 2022-10- main bund road ch from 0 to IDA / 66210 Post Request for Bids Open - National 122,134.83 0.00 Implementat 2019-11-15 2021-10-21 2021-11-18 2021-12-18 2022-01-22 Improvements Envelope 29 1+525 ( IWWRMP- ion 2/WORKS/ID/OCBN/01-2 ) LK-MOMDE-123606-CW-RFB Pending / Rehabilitation of Dewahuwa Component 2: Infrastructure Single Stage - One 2022-12- IDA / 66210 Post Request for Bids Open - National 579,550.56 0.00 Implementat 2019-11-19 2021-09-22 2021-10-20 2021-11-19 2021-12-24 Scheme ( IWWRMP- Improvements Envelope 24 ion 2/WORKS/ID/OCBN/03 ) LK-MOMDE-124090-CW-RFB / Improvements to Main Canal Pending Component 2: Infrastructure Single Stage - One 2023-06- (LB) of Huruluwewa Scheme ( IDA / 66210 Post Request for Bids Open - National 647,022.47 0.00 Implementat 2021-03-16 2021-09-27 2021-10-25 2021-11-24 2021-12-29 Improvements Envelope 22 IWWRMP- ion 2/WORKS/ID/OCBN/04-1) LK-MOMDE-124402-CW-RFB / Improvements to Pending Component 2: Infrastructure Single Stage - One 2023-06- Huruluwewa Main Canal (RB) IDA / 66210 Post Request for Bids Open - National 687,359.55 0.00 Implementat 2021-03-16 2021-09-27 2021-10-25 2021-11-24 2021-12-29 Improvements Envelope 22 (IWWRMP- ion 2/WORKS/ID/OCBN/04-2) LK-MOMDE-124408-CW-RFB / Improvements to (22 km) Pending Component 2: Infrastructure Single Stage - One 2023-07- Branch canal and structures of IDA / 66210 Post Request for Bids Open - National 815,235.96 0.00 Implementat 2021-03-16 2021-10-12 2021-11-09 2021-12-09 2022-01-13 Improvements Envelope 07 Illukuchenal Unit ( IWWRMP- ion 2/WORKS/ID/OCBN/05 ) LK-MOMDE-124412-CW-RFB / Rehabilitation of tank bund Pending (1.5 km) including Rip Rap Component 2: Infrastructure Single Stage - One 2024-01- IDA / 66210 Post Request for Bids Open - National 337,640.45 0.00 Implementat 2019-12-02 2021-10-04 2021-11-01 2021-12-01 2022-01-05 and sluice of Mahalindawewa Improvements Envelope 05 ion Tank ( IWWRMP- 2/WORKS/ID/OCBN/06) LK-MOMDE-124591-CW-RFB Pending / Rehabilititation of Component 2: Infrastructure Single Stage - One 2022-12- IDA / 66210 Post Request for Bids Open - National 725,466.29 0.00 Implementat 2019-11-14 2021-09-20 2021-10-18 2021-11-17 2021-12-22 Nagadeepa Tank ( IWWRMP- Improvements Envelope 22 ion 2/WORKS/ID/OCBN/07) LK-MOMDE-124592-CW-RFB Pending / Rehabilititation of Component 2: Infrastructure Single Stage - One 2023-04- IDA / 66210 Post Request for Bids Open - National 369,932.58 0.00 Implementat 2019-12-16 2022-01-10 2022-02-07 2022-03-09 2022-04-13 Wadamunai Tank ( IWWRMP- Improvements Envelope 13 ion 2/WORKS/ID/OCBN/08 ) LK-MOMDE-124593-CW-RFB / Rehabilitation of Vahanery Pending Component 2: Infrastructure Single Stage - One 2023-04- Tank bund from Stn 0+000 to IDA / 66210 Post Request for Bids Open - National 551,604.19 0.00 Implementat 2019-12-16 2022-01-11 2022-02-08 2022-03-10 2022-04-14 Improvements Envelope 14 Stn 2+100 ( IWWRMP- ion 2/WORKS/ID/OCBN/09-1 ) LK-MOMDE-124671-CW-RFB / Improvements of Access Pending road of Vahanery tank form Component 2: Infrastructure Single Stage - One 2023-04- IDA / 66210 Post Request for Bids Open - National 775,000.00 0.00 Implementat 2019-12-27 2022-01-11 2022-02-08 2022-03-10 2022-04-14 Stn 0+000 to 7+683 Improvements Envelope 14 ion (Santhiyar road) ( IWWRMP- 2/WORKS/ID/OCBN/09-2 ) LK-MOMDE-124594-CW-RFB Pending / Rehabilitation of HaliEla Component 2: Infrastructure Single Stage - One 2022-12- IDA / 66210 Post Request for Bids Open - National 422,191.01 0.00 Implementat 2019-12-16 2021-09-09 2021-10-07 2021-11-06 2021-12-11 Tank ( IWWRMP- Improvements Envelope 11 ion 2/WORKS/ID/OCBN/10) LK-MOMDE-124595-CW-RFB Pending / Rehabilitation of Component 2: Infrastructure Single Stage - One 2022-11- IDA / 66210 Post Request for Bids Open - National 1,216,044.94 0.00 Implementat 2019-12-02 2021-08-23 2021-09-20 2021-10-20 2021-11-24 Akathimurippu Tank ( Improvements Envelope 24 ion IWWRMP- 2/WORKS/ID/OCBN/11) LK-MOMDE-124596-CW-RFB Pending / Rehabilitation of Pavatkulam Component 2: Infrastructure Single Stage - One 2022-10- IDA / 66210 Post Request for Bids Open - National 874,719.10 0.00 Implementat 2019-12-02 2021-07-30 2021-08-27 2021-09-26 2021-10-31 Tank ( IWWRMP- Improvements Envelope 31 ion 2/WORKS/ID/OCBN/12 ) LK-MOMDE-124642-CW-RFB Pending / Improvements to Mavilaru Component 2: Infrastructure Single Stage - One 2023-02- IDA / 66210 Post Request for Bids Open - National 522,646.07 0.00 Implementat 2020-02-03 2021-11-24 2021-12-22 2022-01-21 2022-02-25 Headworks (LB) ( IWWRMP- Improvements Envelope 25 ion 2/WORKS/ID/OCBN/13-1) LK-MOMDE-124649-CW-RFB Pending / Improvements to Mavilaru Component 2: Infrastructure Single Stage - One 2023-03- IDA / 66210 Post Request for Bids Open - National 412,247.19 0.00 Implementat 2020-02-06 2021-12-01 2021-12-29 2022-01-28 2022-03-04 Headworks (RB) ( IWWRMP- Improvements Envelope 04 ion 2/WORKS/ID/OCBN/13-2 ) LK-MOMDE-124655-CW-RFB Pending / Rehabilitation of Peramadu Component 2: Infrastructure Single Stage - One 2023-03- IDA / 66210 Post Request for Bids Open - National 595,505.62 0.00 Implementat 2021-03-22 2021-12-22 2022-01-19 2022-02-18 2022-03-25 Tank ( IWWRMP- Improvements Envelope 25 ion 2/WORKS/ID/OCBN/14) Page 5 LK-MOMDE-124660-CW-RFB / Improvements to RB Main Pending canal from 0+000Km to Component 2: Infrastructure Single Stage - One 2023-02- IDA / 66210 Post Request for Bids Open - National 676,471.91 0.00 Implementat 2019-12-20 2021-11-22 2021-12-20 2022-01-19 2022-02-23 1+465Km of Viyadikulam Improvements Envelope 23 ion Scheme ( IWWRMP- 2/WORKS/ID/OCBN/15) LK-MOMDE-125494-CW-RFB / Rehabilitation of Pending Component 2: Infrastructure Single Stage - One 2022-12- Muhathankulam Scheme ( IDA / 66210 Post Request for Bids Open - National 629,213.48 0.00 Implementat 2019-12-23 2021-09-06 2021-10-04 2021-11-03 2021-12-08 Improvements Envelope 08 IWWRMP- ion 2/WORKS/ID/OCBN/17) LK-MOMDE-125496-CW-RFB Pending / Rehabilitation of Arawatta Component 2: Infrastructure Single Stage - One 2022-11- IDA / 66210 Post Request for Bids Open - National 169,151.69 0.00 Implementat 2019-12-27 2021-08-09 2021-09-06 2021-10-06 2021-11-10 tank bund ( IWWRMP- Improvements Envelope 10 ion 2/WORKS/ID/OCBN/18) LK-MOMDE-125506-CW-RFB / Rehabilitation of Pending Component 2: Infrastructure Single Stage - One 2022-10- Waduwawala Scheme ( IDA / 66210 Post Request for Bids Open - National 352,808.99 0.00 Implementat 2019-12-27 2021-07-20 2021-08-17 2021-09-16 2021-10-21 Improvements Envelope 21 IWWRMP- ion 2/WORKS/ID/OCBN/19 ) LK-MOMDE-225755-CW-RFB / Improvement to Bund (1 km), rip rap Protection, Pending Component 2: Infrastructure Single Stage - One 2023-07- Instrumentation and Toe filter IDA / 66210 Post Request for Bids Open - National 1,685,393.26 0.00 Implementat 2021-06-30 2022-04-26 2022-05-24 2022-06-23 2022-07-28 Improvements Envelope 28 & drain of Senanayaka ion Samudraya Reservoir (IWWRMP- 2/WORKS/ID/OCBN/20) LK-MOMDE-225762-CW-RFB Pending / Rehabilitation of Component 2: Infrastructure Single Stage - One 2023-04- IDA / 66210 Post Request for Bids Open - National 842,696.63 0.00 Implementat 2021-07-28 2021-12-30 2022-01-27 2022-02-26 2022-04-02 Maruthankulam (IWWRMP- Improvements Envelope 03 ion 2/WORKS/NPC/OCBN/209) LK-MOMDE-228195-CW-RFB Pending / Rehabilitation on Akkarayan Component 2: Infrastructure Single Stage - One 2023-10- IDA / 66210 Post Request for Bids Open - National 842,696.63 0.00 Implementat 2021-07-16 2022-01-12 2022-02-09 2022-03-11 2022-04-15 kulam Headworks (IWWRMP- Improvements Envelope 07 ion 2/WORKS/NPC/OCBN/202 LK-MOMDE-123596-CW-RFB Request for Bids - / Improvement to Bathalagoda Pending Component 2: Infrastructure Single Stage - One Works (without 2022-07- Anicut (Mechanical works) ( IDA / 66210 Post Request for Bids Open - National 110,505.62 0.00 Implementat 2019-11-15 2021-06-24 2021-07-22 2021-08-21 2021-09-25 Improvements Envelope prequalification) 02 IWWRMP- ion SPD 2/WORKS/ID/OCBN/01-3 ) LK-MOMDE-123597-CW-RFB Request for Bids - / Improvement to Bathalagoda Pending Component 2: Infrastructure Single Stage - One Works (without 2022-07- main CHL road from 0+000 to IDA / 66210 Post Request for Bids Open - National 179,606.74 0.00 Implementat 2019-11-15 2021-07-05 2021-08-02 2021-09-01 2021-10-06 Improvements Envelope prequalification) 13 2+100 km ( IWWRMP- ion SPD 2/WORKS/ID/OCBN/01-4 ) LK-MOMDE-123600-CW-RFB Request for Bids - / Rehabilitation of D1, D2, D4 Pending Component 2: Infrastructure Single Stage - One Works (without 2022-10- canals in Bathalagoda Scheme IDA / 66210 Post Request for Bids Open - National 259,662.92 0.00 Implementat 2019-11-19 2021-07-26 2021-08-23 2021-09-22 2021-10-27 Improvements Envelope prequalification) 27 ( IWWRMP- ion SPD 2/WORKS/ID/OCBN/02-1) LK-MOMDE-123602-CW-RFB Request for Bids - / Rehabilitation of D5, D7, D7 Pending Component 2: Infrastructure Single Stage - One Works (without 2022-10- RB canals in Bathalagoda IDA / 66210 Post Request for Bids Open - National 205,505.62 0.00 Implementat 2019-11-19 2021-07-28 2021-08-25 2021-09-24 2021-10-29 Improvements Envelope prequalification) 29 Scheme ( IWWRMP- ion SPD 2/WORKS/ID/OCBN/02-2 ) LK-MOMDE-125529-CW-RFB / Improvements to Walawa RB Request for Bids - Pending 41 km Main Canal from Component 2: Infrastructure Single Stage - One Works (without 2024-01- IDA / 66210 Post Request for Bids Open - National 2,302,251.70 0.00 Implementat 2019-11-22 2021-05-03 2021-05-31 2021-06-30 2021-08-04 0+000 km to 17+400 km ( Improvements Envelope prequalification) 31 ion IWWRMP- SPD 2/WORKS/MASL/OCBN/100- 1) LK-MOMDE-125831-CW-RFB / Improvements to Walawa RB 41 km Main Canal from Request for Bids - Pending 23+400 km to 33+420 km Component 2: Infrastructure Single Stage - One Works (without 2024-03- IDA / 66210 Post Request for Bids Open - National 2,444,167.62 0.00 Implementat 2019-11-22 2021-06-02 2021-06-30 2021-07-30 2021-09-03 and 34+640km to 40+910 Improvements Envelope prequalification) 01 ion km ( IWWRMP- SPD 2/WORKS/MASL/OCBN/100-2 ) LK-MOMDE-125832-CW-RFB / Hydro Mechanical works of Request for Bids - Pending Walawa RB Main Canal ( Component 2: Infrastructure Single Stage - One Works (without 2023-03- IDA / 66210 Post Request for Bids Open - National 332,261.49 0.00 Implementat 2019-11-29 2021-06-09 2021-07-07 2021-08-06 2021-09-10 IWWRMP- Improvements Envelope prequalification) 24 ion 2/WORKS/MASL/OCBN/100-3 SPD ) LK-MOMDE-125833-CW-RFB / Ecological Improvements Request for Bids - and Marking Reservation Pending Component 2: Infrastructure Single Stage - One Works (without 2023-03- along Walawa RB Main Canal ( IDA / 66210 Post Request for Bids Open - National 422,232.84 0.00 Implementat 2019-11-29 2021-06-09 2021-07-07 2021-08-06 2021-09-10 Improvements Envelope prequalification) 24 IWWRMP- ion SPD 2/WORKS/MASL/OCBN/100-4 ) LK-MOMDE-125835-CW-RFB / Installation of Automated National Geodetic Survey Systems in Procurement Under Component 2: Infrastructure Single Stage - Two 2022-11- Kotmale & Randenigala Dams IDA / 66210 Prior Request for Bids Open - National Document - 2 1,623,595.51 0.00 Implementat 2019-11-19 2021-07-09 2021-08-06 2021-11-23 Improvements Envelope 23 for Dam Movement Envelope process ion Monitoring ( IWWRMP- (Non Bank-SPD) 2/WORKS/MASL//OCBN/102 ) LK-MOMDE-125836-CW-RFB National / Supply and Installation of Procurement Under Component 2: Infrastructure Single Stage - Two 2022-12- Gantry Crane for Polgolla IDA / 66210 Prior Request for Bids Open - National Document - 2 2,000,000.00 0.00 Implementat 2019-12-03 2021-07-23 2021-08-20 2021-12-07 Improvements Envelope 07 Barrage ( IWWRMP- Envelope process ion 2/WORKS/MASL//OCBN/103 ) (Non Bank-SPD) Page 6 LK-MOMDE-125838-CW-RFB National / Supply and Installation of Procurement Under Component 2: Infrastructure Single Stage - Two 2022-11- Gantry Crane for Udawalawe IDA / 66210 Prior Request for Bids Open - National Document - 2 1,185,393.26 0.00 Implementat 2019-12-03 2021-07-12 2021-08-09 2021-11-26 Improvements Envelope 26 Dam ( IWWRMP- Envelope process ion 2/WORKS/MASL//OCBN/104 ) (Non Bank-SPD) LK-MOMDE-163036-CW-RFB National / Repairs to gates of irrigation Procurement Pending Component 2: Infrastructure Single Stage - One 2023-04- structures in Kalawewa Left IDA / 66210 Post Request for Bids Open - National Document - 1 449,438.20 0.00 Implementat 2020-07-06 2021-07-16 2021-08-13 2021-09-12 2021-10-17 Improvements Envelope 20 Bank main canal (IWWRMP- Envelope process ion 2/WORKS/MASL//OCBN/105) (Non Bank-SPD) LK-MOMDE-163026-CW-RFB National / Rehabilitation of Headworks Procurement Pending Component 2: Infrastructure Single Stage - One 2022-10- under Piramanthalaru Scheme IDA / 66210 Post Request for Bids Open - National Document - 1 327,865.17 0.00 Implementat 2020-08-31 2021-07-13 2021-08-10 2021-09-09 2021-10-14 Improvements Envelope 14 (IWWRMP- Envelope process ion 2/WORKS/NPC/OCBN/203-1) (Non Bank-SPD) LK-MOMDE-163046-CW-RFB National / Rehabilitation of Procurement Pending Downstream under Component 2: Infrastructure Single Stage - One 2022-10- IDA / 66210 Post Request for Bids Open - National Document - 1 224,719.10 0.00 Implementat 2020-09-21 2021-07-19 2021-08-16 2021-09-15 2021-10-20 Kanagambikai Scheme Improvements Envelope 20 Envelope process ion (IWWRMP- (Non Bank-SPD) 2/WORKS/NPC/OCBN/204) LK-MOMDE-125488-CW-RFB Request for Bids - / Rehabilitation of Haththota Pending Component 2: Infrastructure Single Stage - One Works (without 2023-03- Anicut Scheme (1st to 5th Km IDA / 66210 Post Request for Bids Open - National 341,337.08 0.00 Implementat 2019-12-23 2021-12-03 2021-12-31 2022-01-30 2022-03-06 Improvements Envelope prequalification) 06 canal) ( IWWRMP- ion SPD 2/WORKS/ID/OCBN/16-1) LK-MOMDE-234772-CW-RFB Request for Bids - / Rehabilititation of Haththota Pending Component 2: Infrastructure Single Stage - One Works (without 2023-01- Anicut Scheme (6th to 10th IDA / 66210 Post Request for Bids Open - National 314,971.91 0.00 Implementat 2021-07-01 2021-10-28 2021-11-25 2021-12-25 2022-01-29 Improvements Envelope prequalification) 29 Km canal) (IWWRMP- ion SPD 2/WORKS/ID/OCBN/16-2) LK-MOMDE-163064-CW-RFB Request for Bids - Pending / Rehabilitation of Component 2: Infrastructure Single Stage - One Works (without 2022-12- IDA / 66210 Post Request for Bids Open - National 840,000.00 0.00 Implementat 2021-07-21 2021-09-01 2021-09-29 2021-10-29 2021-12-03 Nithakaikulam (IWWRMP- Improvements Envelope prequalification) 03 ion 2/WORKS/NPC/OCBN/208) SPD GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOMDE-117380-GO-DIR / Procurement of Relevant Data and Maps for Component 1: Watershed and preparation of GIS maps / Post Direct Selection Direct 15,151.52 0.00 Canceled 2019-08-05 2019-08-13 2019-09-17 2020-01-15 Water Resources Planning including specific geographic locations/sub-watersheds (IWWRMP/PP/GOODS/01) LK-MOMDE-123586-GO-RFB / Procurement of Crew Cabs ( Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 475,000.00 0.00 Canceled 2020-06-09 2020-06-23 2020-08-04 2020-09-03 2020-10-08 2021-04-06 IWWRMP- Improvements Envelope 2/GOODS/PMU/OCBN/3 ) LK-MOMDE-124216-GO-DIR / Purchasing of GIS Maps and Component 1: Watershed and / Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-01-27 2020-02-10 2020-03-21 2020-09-17 Satellite Images ( IWWRMP- Water Resources Planning 1/GOODS/PMU/OCBN/6 ) LK-MOMDE-123574-GO-RFB Pending / Procurement of clay Component 2: Infrastructure Single Stage - One IDA / 66210 Post Request for Bids Open - National 675,000.00 0.00 Implementati 2022-01-24 2022-02-07 2022-03-07 2022-04-06 2022-05-11 2023-03-07 grouting machines ( IWWRMP- Improvements Envelope on 2/GOODS/PMU/OCBN/1 ) LK-MOMDE-124212-GO-RFB Pending / Procurement of computer Component 1: Watershed and Single Stage - One IDA / 66210 Post Request for Bids Open - National 60,000.00 0.00 Implementati 2022-02-23 2022-03-09 2022-04-06 2022-05-06 2022-06-10 2022-10-08 and accessories-1 ( IWWRMP- Water Resources Planning Envelope on 2/GOODS/PMU/OCBN/4 ) LK-MOMDE-124214-GO-RFB Pending / Procurement of Photocopy Component 2: Infrastructure Single Stage - One IDA / 66210 Post Request for Bids Open - National 30,000.00 0.00 Implementati 2022-03-25 2022-04-08 2022-05-06 2022-06-05 2022-07-10 2022-11-07 Machines-1 ( IWWRMP- Improvements Envelope on 2/GOODS/PMU/OCBN/5 ) LK-MOMDE-124219-GO-RFB Pending / Procurement of Office Component 1: Watershed and Single Stage - One IDA / 66210 Post Request for Bids Open - National 30,000.00 0.00 Implementati 2022-03-22 2022-04-11 2022-05-09 2022-06-08 2022-07-13 2022-11-10 Equipments-1 ( IWWRMP- Water Resources Planning Envelope on 2/GOODS/PMU/OCBN/7 ) LK-MOMDE-123581-GO-RFB Pending / Procurement of water weeds Component 2: Infrastructure Single Stage - One IDA / 66210 Post Request for Bids Open - National 845,000.00 0.00 Implementati 2021-07-09 2021-08-06 2021-09-03 2021-10-03 2021-11-07 2022-09-03 removers ( IWWRMP- Improvements Envelope on 2/GOODS/PMU/OCBN/2 ) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOMDE-157171-NC-RFQ Pending / Conducting Asset Component 4: Project Request for Single Stage - One / Post Limited 2,808.99 0.00 Implementati 2020-05-30 2020-07-18 2020-08-17 verification and Valuation for Management Quotations Envelope on the PMU-IWWRMP Assets CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 7 LK-MOMDE-116917-CS- INDV / Consultancy services Consultant Component 3: Multi-sector for Preparation of TOR for / Post Qualification Limited 9,090.91 0.00 Canceled 2019-07-25 2019-08-08 2019-09-07 2019-10-12 2020-04-09 Water Resources Planning River Basin Management Plan Selection (IWWRMP/PP/CONS/30) LK-MOMDE-120102-CS- QCBS / Consultancy service to finalize the Bid documents for Component 1: Watershed and Quality And Cost- / Post Open - National 12,121.21 0.00 Canceled 2019-09-16 2019-10-07 2019-11-20 2019-12-18 2020-01-17 2020-02-21 2020-03-27 2021-03-27 irrigation dam rehabilitation Water Resources Planning Based Selection of Component 1 (IWWRMP/PP/CONS/35) LK-MOMDE-121715-CS-CQS / Consultancy Service for Consultant preparation of Watershed Component 1: Watershed and / Post Qualification Open - National 15,151.52 0.00 Canceled 2019-07-17 2019-08-07 2019-09-20 2019-10-20 2019-11-24 2020-05-22 Management plans for Water Resources Planning Selection selected area (IWWRMP/PP/CONS/36) LK-MOMDE-121716-CS-CQS Consultant / Consultancy services for Component 2: Infrastructure / Post Qualification Open - National 30,303.03 0.00 Canceled 2019-09-15 2019-10-06 2019-11-19 2019-12-19 2020-01-23 2020-07-21 preparation of Risk Assesment Improvements Selection (IWWRMP/PP/CONS/37) LK-MOMDE-125891-CS- QCBS / Consultancy service for preparation of Watershed management plan for seven selected divisions -Nuwara Component 1: Watershed and Quality And Cost- / Post Open - International 1,348,314.61 0.00 Canceled 2019-12-05 2019-12-26 2020-02-08 2020-03-07 2020-04-06 2020-05-11 2020-06-15 2021-06-15 Eliya, Badulla, Walapnae & Water Resources Planning Based Selection Kandy (Delthota, Haguranketha and Pahatha Hewaheta) (IWWRMP- 1/CS/QCBS/1) LK-MOMDE-125993-CS- QCBS / Consultancy Service for study and recommendation for back erosion of Rantambe dam spillway tail canal ,LB erosion Component 2: Infrastructure Quality And Cost- / Post Open - International 786,516.85 0.00 Canceled 2019-11-25 2019-12-16 2020-01-29 2020-02-26 2020-03-27 2020-05-01 2020-06-05 2021-06-05 of Victoria dam spillway tail Improvements Based Selection canal, Back Analysis for Victoria dam and Kotmale Dam grouting gallery inspection (IWWRMP- 2/CS/QCBS/7) LK-MOMDE-126757-CS- QCBS / Development of Basin Management plan for Walawa Component 1: Watershed and Quality And Cost- / Post Open - National 421,348.31 0.00 Canceled 2020-05-25 2020-06-15 2020-07-29 2020-08-26 2020-09-25 2020-10-30 2020-12-04 2021-12-04 & Ma Oya including the Water Resources Planning Based Selection stakeholder workshops (IWWRMP-1/CS/QCBS/5) LK-MOMDE-126759-CS- QCBS / Consultancy service for Expansion and Component 1: Watershed and Quality And Cost- / Post Open - National 561,797.75 0.00 Canceled 2020-10-29 2020-11-19 2021-01-02 2021-01-30 2021-03-01 2021-04-05 2021-05-10 2023-05-10 enhancement of WMS/MASL Water Resources Planning Based Selection bulk water allocation model (IWWRMP-1/CS/QCBS/6) LK-MOMDE-138818-CS-CQS / Consultancy on improving reservoir capacity by dredging Consultant Component 1: Watershed and sand deposits - medium and / Post Qualification Open - National 112,359.55 0.00 Canceled 2020-04-01 2020-04-22 2020-06-05 2020-07-05 2020-08-09 2021-08-09 Water Resources Planning minor irrigation tanks within Selection the watershed (IWWRMP- 1/CS/CQS/2) LK-MOMDE-138828-CS-CQS / Establishment of policy and Consultant institutional arrangements for Component 2: Infrastructure / Post Qualification Open - National 112,359.55 0.00 Canceled 2020-04-14 2020-05-05 2020-06-18 2020-07-18 2020-08-22 2021-08-22 dam safety, and water Improvements Selection resources management (IWWRMP-2/CS/CQS/15) LK-MOMDE-138831-CS-CQS / Consultancy service for Preparation of Environmental Social Management Consultant Component 2: Infrastructure Framework and Environmental / Post Qualification Open - National 25,280.90 0.00 Canceled 2020-12-16 2021-01-06 2021-02-19 2021-03-21 2021-04-25 2022-04-25 Improvements social screening report for Selection rehabiliate dams & canals cluster VII (IWWRMP- 2/CS/CQS/18) LK-MOMDE-138832-CS-CQS / Consultancy service for Preparation of Environmental Social Management Consultant Component 2: Infrastructure Framework and Environmental / Post Qualification Open - National 25,280.90 0.00 Canceled 2019-12-13 2020-01-03 2020-02-16 2020-03-17 2020-04-21 2021-04-21 Improvements social screening report for Selection rehabilitate dams & canals cluster VIII (IWWRMP- 2/CS/CQS/19) LK-MOMDE-138824-CS-CQS / Consultancy service for Preparation of Environmental Social Management Consultant Component 2: Infrastructure Framework and Environmental / Post Qualification Open - National 56,179.78 0.00 Canceled 2020-09-09 2020-09-30 2020-11-13 2020-12-13 2021-01-17 2021-07-16 Improvements social screening report for Selection rehabilitate dams & canals cluster IV ( IWWRMP- 2/CS/CQS/11) LK-MOMDE-138829-CS-CQS / Consultancy service for Preparation of Environmental Social Management Consultant Component 2: Infrastructure Framework and Environmental / Post Qualification Open - National 11,235.96 0.00 Canceled 2020-02-17 2020-03-09 2020-04-22 2020-05-22 2020-06-26 2021-06-26 Improvements social screening report for Selection rehabiliate dams & canals cluster V (IWWRMP- 2/CS/CQS/16) Page 8 LK-MOMDE-138830-CS-CQS / Consultancy service for Preparation of Environmental Social Management Consultant Component 2: Infrastructure Framework and Environmental / Post Qualification Open - National 22,471.91 0.00 Canceled 2019-12-09 2019-12-30 2020-02-12 2020-03-13 2020-04-17 2021-04-17 Improvements social screening report for Selection rehabilitate dams & canals cluster VI (IWWRMP- 2/CS/CQS/17) LK-MOMDE-138822-CS-CQS / Consultancy service for Preparation of Environmental Social Management Consultant Component 2: Infrastructure Framework and Environmental / Post Qualification Open - National 56,179.78 0.00 Canceled 2020-02-28 2020-03-20 2020-05-03 2020-06-02 2020-07-07 2021-01-03 Improvements social screening report for Selection rehabilitate dams & canals cluster II (IWWRMP- 2/CS/CQS/9) LK-MOMDE-138835-CS-CQS / Feasibility study tocheck the Consultant Component 2: Infrastructure possibility of diverson of / Post Qualification Open - National 280,898.88 0.00 Canceled 2020-09-28 2020-10-19 2020-12-02 2021-01-01 2021-02-05 2022-02-05 Improvements Kaluganga Water to the CKD Selection area (IWWRMP-2/CS/CQS/22) LK-MOMDE-138823-CS-CQS / Consultancy service for Preparation of Environmental Social Management Consultant Component 2: Infrastructure Framework and Environmental / Post Qualification Open - National 56,179.78 0.00 Canceled 2020-08-31 2020-09-21 2020-11-04 2020-12-04 2021-01-08 2021-07-07 Improvements social screening report for Selection rehabilitate dams & canals cluster III ( IWWRMP- 2/CS/CQS/10) LK-MOMDE-138836-CS-CQS / Preparation of guidline for Consultant Component 2: Infrastructure sustainable Dam safety and / Post Qualification Open - National 11,235.96 0.00 Canceled 2020-07-30 2020-08-20 2020-10-03 2020-11-02 2020-12-07 2021-12-07 Improvements Hydraulic Assets ( IWWRMP- Selection 2/CS/CQS/23 ) LK-MOMDE-138838-CS-CQS Consultant Component 2: Infrastructure Pending / Risk assessment for all / Post Qualification Open - National 280,898.88 0.00 2020-11-01 2020-11-22 2021-01-05 2021-02-04 2021-03-11 2022-03-11 Improvements Implementation identified dams Selection LK-MOMDE-162963-CS- QCBS / Consultancy service for preparation of Mahaweli Component 1: Watershed and Quality And Cost- Pending / Post Open - National 337,078.65 0.00 2020-06-16 2020-07-07 2020-08-20 2020-09-17 2020-10-17 2020-11-21 2020-12-26 2021-12-26 Upper Watershed Water Resources Planning Based Selection Implementation management intervention plan for cluster I (IWWRMP- 1/CS/QCBS/1) LK-MOMDE-162965-CS- QCBS / Consultancy service for preparation of Mahaweli Component 1: Watershed and Quality And Cost- Pending / Post Open - National 280,898.88 0.00 2020-10-29 2020-11-19 2021-01-02 2021-01-30 2021-03-01 2021-04-05 2021-05-10 2022-05-10 Upper Watershed Water Resources Planning Based Selection Implementation management intervention plan for cluster II (IWWRMP- 1/CS/QCBS/2) LK-MOMDE-138837-CS-CQS / preparation of O & M Consultant Manuals and Emergency Component 2: Infrastructure Pending / Post Qualification Open - National 280,898.88 0.00 2021-12-01 2021-12-22 2022-02-04 2022-03-06 2022-04-10 2023-04-10 Action plans for selected Improvements Implementation Selection dams ( IWWRMP- 2/CS/CQS/24 ) LK-MOMDE-138834-CS-CQS / Feasibility Study for Construction of Pooneryn Consultant Tank and Barrages including Component 2: Infrastructure Pending / Post Qualification Open - National 252,808.99 0.00 2020-09-20 2020-10-11 2020-11-24 2020-12-24 2021-01-28 2022-01-28 Investigation, Detailed Design, Improvements Implementation Selection BD preparation, EIA and Social assessment (IWWRMP- 2\/CS/CQS/21) LK-MOMDE-162967-CS- QCBS / Consultancy service for preparation of Mahaweli Component 1: Watershed and Quality And Cost- Pending / Post Open - National 224,719.10 0.00 2021-02-01 2021-02-22 2021-04-07 2021-05-05 2021-06-04 2021-07-09 2021-08-13 2022-08-13 Upper Watershed Water Resources Planning Based Selection Implementation management intervention plan for cluster III (IWWRMP- 1/CS/QCBS/3) LK-MOMDE-138825-CS-CQS / Consultancy Service for Consultant Component 2: Infrastructure Pending preparation of Livelihood / Post Qualification Open - National 56,179.78 0.00 2020-09-06 2020-09-27 2020-11-10 2020-12-10 2021-01-14 2021-07-13 Improvements Implementation Support Assistance Plan (LSA) Selection ( IWWRMP-2/CS/CQS/12 ) LK-MOMDE-162968-CS- QCBS / Consultancy Service development of best practices Component 1: Watershed and Quality And Cost- Pending for water management using / Post Open - National 56,179.78 0.00 2020-09-29 2020-10-20 2020-12-03 2020-12-31 2021-01-30 2021-03-06 2021-04-10 2021-10-07 Water Resources Planning Based Selection Implementation native , herbal, economical important species (IWWRMP- 1/CS/QCBS/4) LK-MOMDE-138819-CS-CQS / Development Groundwater Consultant management plans & legal Component 1: Watershed and Pending / Post Qualification Open - National 140,449.44 0.00 2020-09-25 2020-10-16 2020-11-29 2020-12-29 2021-02-02 2022-02-02 framework for basins and Water Resources Planning Implementation Selection national level (WRB) (IWWRMP- 1/CS/CQS/3) LK-MOMDE-121717-CS-CQS Consultant / Preparation of Management Component 4: Project Pending / Post Qualification Open - National 12,121.21 0.00 2020-10-01 2020-10-22 2020-12-05 2021-01-04 2021-02-08 2021-08-07 Information System Management Implementation Selection (IWWRMP/PP/CONS/15) LK-MOMDE-138839-CS-CQS / Consultancy Service for Consultant Component 4: Project Pending Development for Project / Post Qualification Open - National 14,044.94 0.00 2020-10-15 2020-11-05 2020-12-19 2021-01-18 2021-02-22 2021-05-23 Management Implementation Website (IWWRMP- Selection 4/CS/CQS/26) Page 9 LK-MOMDE-138827-CS-CQS / Consultancy service for Consultant Component 2: Infrastructure Pending design of Bridge at 4+000 km / Post Qualification Open - National 28,089.89 0.00 2020-10-20 2020-11-10 2020-12-24 2021-01-23 2021-02-27 2021-08-26 Improvements Implementation of walawa RB main canal Selection (IWWRMP-2\/CS/CQS/14) LK-MOMDE-138821-CS-CQS / Consultancy service for Preparation of Environmental Consultant Component 2: Infrastructure Pending Social Management / Post Qualification Open - National 56,179.78 0.00 2020-08-21 2020-09-11 2020-10-25 2020-11-24 2020-12-29 2021-06-27 Improvements Implementation Framework and Environmental Selection social screening report for rehabiliate dams & canals EPC LK-MOMDE-138826-CS-CQS / Consultancy Service for inspection, identification of Consultant Component 2: Infrastructure Pending defects and repair works of / Post Qualification Open - National 84,269.66 0.00 2020-09-20 2020-10-11 2020-11-24 2020-12-24 2021-01-28 2021-07-27 Improvements Implementation syphone from 3+950 km to Selection 4+330 km of walawa RB main canal (IWWRMP-2/CS/CQS/13) LK-MOMDE-162972-CS- QCBS / Consultancy service for development for Component 1: Watershed and Quality And Cost- Pending / Post Open - National 56,179.78 0.00 2020-09-29 2020-10-20 2020-12-03 2020-12-31 2021-01-30 2021-03-06 2021-04-10 2022-04-10 integrated design proposal for Water Resources Planning Based Selection Implementation upper periphary of Polgolla reservoir (IWWRMP- 1/CS/QCBS/5) LK-MOMDE-118633-CS- QCBS / Consultancy Service for study and recommendation for back erosion of Rantambe dam spillway tail canal ,LB erosion Component 2: Infrastructure Quality And Cost- Pending / Post Open - International 1,202,448.09 0.00 2020-11-19 2020-12-10 2021-01-23 2021-02-20 2021-03-22 2021-04-26 2021-05-31 2022-05-31 of Victoria dam spillway tail Improvements Based Selection Implementation canal, Back Analysis for Victoria dam and Kotmale Dam grouting gallery inspection (IWWRMP/PP/CONS/31) LK-MOMDE-118622-CS- QCBS / Consultancy Services for Feasibility study on Safety Component 2: Infrastructure Quality And Cost- Pending / Post Open - International 842,696.63 0.00 2020-11-02 2020-11-23 2021-01-06 2021-02-03 2021-03-05 2021-04-09 2021-05-14 2022-05-14 of Senanayaka Samudraya Improvements Based Selection Implementation Headworks (IWWRMP/PP/CONS/33) LK-MOMDE-162975-CS-CQS / Consultancy service for Consultant Component 1: Watershed and Pending Expansion and enhancement / Post Qualification Open - International 561,795.75 0.00 2020-11-02 2020-11-23 2021-02-06 2021-03-08 2021-04-19 2022-04-19 Water Resources Planning Implementation of WMS/MASL bulk water Selection allocation model LK-MOMDE-162977-CS-CQS / Consultancy service for Preparation of Environmental Consultant Social Management Component 2: Infrastructure Pending / Post Qualification Open - National 84,269.00 0.00 2020-08-30 2020-09-20 2020-11-03 2020-12-03 2021-01-07 2021-03-08 Framework and Environmental Improvements Implementation Selection social screening report for rehabilitation of dams & canals NPC LK-MOMDE-138820-CS-CQS / Development of Consultant Groundwater Data & Component 1: Watershed and Pending IDA / 66190 Post Qualification Open - National 56,179.78 0.00 2020-04-10 2020-05-01 2020-06-14 2020-07-14 2020-08-18 2021-08-18 Information System for WRB Water Resources Planning Implementation Selection covering entire country (IWWRMP-1/CS/CQS/7) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOMDE-113221-CS- INDV / Consultancy services for Environmental Social Individual Impact Assessment for Component 2: Infrastructure / Post Consultant Limited 9,090.91 9,340.87 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-28 2019-06-07 2019-06-03 2019-06-17 2019-06-03 2019-08-16 Rehabilitation of Elahara Improvements Selection scheme, Haththota scheme and Arawatta Tank (IWWRMP/PP/CONS/01) LK-MOMDE-113250-CS- INDV / Consultancy services for Environmental Social Impact Assessment for Individual Component 2: Infrastructure Rehabilitation of Hali Ela / Post Consultant Limited 12,121.21 3,593.15 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-28 2019-06-07 2019-06-02 2019-06-15 2019-06-03 2019-08-14 Improvements Tank, Akathimuripu Tank, Selection Madiyawa Tank and Waduwala Scheme (IWWRMP/PP/CONS/02) LK-MOMDE-113252-CS- Individual INDV / Consultancy services Component 2: Infrastructure / Post Consultant Limited 6,060.61 0.00 Under Review 2019-05-30 2019-05-08 2019-06-02 2019-06-07 2019-06-17 2019-08-16 for Aquatic Survey Improvements Selection (IWWRMP/PP/CONS/03) LK-MOMDE-116871-CS- INDV / Consultancy service for Preparation of Operation manual for river basin planning and management, Individual Component 2: Infrastructure customized to the selected / Post Consultant Limited 24,242.42 0.00 Under Review 2019-05-30 2019-05-08 2019-06-02 2019-06-07 2019-06-17 2019-08-16 Improvements river basins (Walawa including Selection the Walawa RB preparation of ESMP, Kalawewa and Mahalindawewa) (IWWRMP/PP/CONS/06) Page 10 LK-MOMDE-116883-CS- INDV / Consultancy for Individual Preparation of guideline for Component 1: Watershed and / Post Consultant Limited 12,121.21 8,274.72 Signed 2019-08-01 2019-07-01 2019-08-06 2019-05-03 2019-08-27 2019-07-09 2019-10-01 2019-07-15 2020-03-29 Sustainable Watershed Water Resources Planning Selection Management (IWWRMP/PP/CONS/08) LK-MOMDE-116900-CS- INDV / Short-term Individual Component 4: Project assignment for Personal / Post Consultant Limited 3,030.30 0.00 Canceled 2019-05-30 2019-05-08 2019-06-04 2019-06-18 2019-07-09 2020-01-05 Management Assistant Selection (IWWRMP/PP/CONS/17) LK-MOMDE-116901-CS- INDV / Consultancy services for Environmental Social Individual Impact Assesment for Component 2: Infrastructure / Post Consultant Limited 12,121.21 2,756.51 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-09 2019-06-07 2019-05-27 2019-06-17 2019-05-30 2019-08-16 Rehabilitation of Improvements Selection Muththuiyankaddu irrigation scheme (IWWRMP/PP/CONS/18) LK-MOMDE-116902-CS- INDV / Consultancy services for Environmental Social Impact Assesment for Individual Rehabilitation of Periyamadu Component 2: Infrastructure Pending / Post Consultant Limited 24,242.42 0.00 2019-08-30 2019-09-04 2019-09-25 2019-10-30 2019-12-29 Tank and Kariyalai Improvements Implementation Selection Nagarpaduwan Tank & irrigation scheme and Periyapandivirichchan scheme (IWWRMP/PP/CONS/19) LK-MOMDE-116903-CS- INDV / Consultancy services for Environmental Social Impact Assesment for Individual Rehabilitation of Component 2: Infrastructure Pending / Post Consultant Limited 27,272.73 0.00 2019-08-30 2019-09-04 2019-09-25 2019-10-30 2020-04-27 Akkarayankulam irrigation Improvements Implementation Selection scheme, Kudamuruthy Tank and Vannerikulam headworks & irrigation scheme (IWWRMP/PP/CONS/20) LK-MOMDE-116906-CS- INDV / Consultancy services for Environmental Social Impact Assesment for Individual Component 2: Infrastructure Rehabilitation of Dewahuwa / Post Consultant Limited 12,121.21 1,875.18 Signed 2019-05-30 2019-05-08 2019-06-04 2019-04-09 2019-06-09 2019-05-27 2019-06-19 2019-06-03 2019-08-18 Improvements tank & scheme and Selection Baththalagoda Anicut & scheme (IWWRMP/PP/CONS/22) LK-MOMDE-116907-CS- INDV / Consultancy services for Environmental Social Individual Impact Assessment for Component 2: Infrastructure / Post Consultant Limited 21,212.12 9,340.87 Signed 2019-05-30 2019-05-08 2019-06-02 2019-04-09 2019-06-07 2019-04-10 2019-06-17 2019-06-03 2019-08-16 Rehabilitation of Huruluwewa Improvements Selection irrigation scheme, Karawita Tank & Ambakolawewa Tank (IWWRMP/PP/CONS/23) LK-MOMDE-116909-CS- INDV / Consultancy services for Environmental Social Impact Assesment for Rehabilitation of Vahanery Individual Component 2: Infrastructure Dam, Panama Tank, / Post Consultant Limited 24,242.42 14,236.74 Signed 2019-05-30 2019-05-08 2019-06-04 2019-05-28 2019-06-11 2019-05-28 2019-06-25 2019-06-03 2019-09-23 Improvements Unnichchai scheme, Selection Nagadeepa Tank, Illukuchenal & Senanayake Samudraya Reservoir (IWWRMP/PP/CONS/24) LK-MOMDE-116910-CS- INDV / Consultancy services for Environmental Social Impact Assesment for Rehabilitation of Pavatkulam Individual Component 2: Infrastructure Tank, Muhathankulam / Post Consultant Limited 24,242.42 13,898.79 Signed 2019-05-30 2019-05-08 2019-06-04 2019-04-09 2019-06-11 2019-05-28 2019-06-25 2019-05-30 2019-09-23 Improvements Scheme, Viyadhikulam Selection irrigation scheme, Peramadu Tank & Scheme and Mavilaru Headworks (IWWRMP/PP/CONS/25) LK-MOMDE-116911-CS- INDV / Consultancy service Individual for preparation of Livelihood Component 2: Infrastructure / Post Consultant Limited 18,181.82 0.00 Canceled 2019-07-09 2019-07-14 2019-08-04 2019-09-08 2020-03-06 Support Assistance Plan (LSA) Improvements Selection - Walawa (IWWRMP/PP/CONS/26) LK-MOMDE-116912-CS- INDV / Consultancy services for Environmental Social Individual Component 2: Infrastructure Impact Assesment for / Post Consultant Limited 9,090.91 3,736.75 Signed 2019-05-30 2019-05-08 2019-06-04 2019-05-15 2019-06-11 2019-05-24 2019-06-25 2019-06-20 2019-08-24 Improvements Rehabilitation of Kothmale Selection Dam & irrigation scheme (IWWRMP/PP/CONS/27) LK-MOMDE-116914-CS- INDV / Individual Consultancy services to prepare mechanical specification, Individual Component 2: Infrastructure Estimation & Bid documents / Post Consultant Limited 9,090.91 11,032.96 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-23 2019-06-07 2019-05-28 2019-06-17 2019-06-03 2020-06-16 Improvements for Gantry crane Polgolla, Selection Udawalawe and Gate Automation for Bowatenna (IWWRMP/PP/CONS/28) LK-MOMDE-116896-CS- INDV / Short-term Individual Component 4: Project assignment for Procurement / Post Consultant Limited 3,030.30 0.00 Under Review 2019-05-30 2019-05-08 2019-06-02 2019-06-07 2019-06-17 2019-12-14 Management Assistant Selection (IWWRMP/PP/CONS/16) Page 11 LK-MOMDE-116904-CS- INDV / Consultancy services for Environmental Social Impact Assesment for Rehabilitation of Individual Component 2: Infrastructure Piramanthalaru Kulam / Post Consultant Limited 27,272.27 8,299.72 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-23 2019-06-07 2019-05-24 2019-06-17 2019-05-30 2019-08-16 Improvements irrigation scheme, Selection Kanagambikaikulam irrigation scheme and Kalmadu tank irrigation scheme (IWWRMP/PP/CONS/21) LK-MOMDE-121767-CS- INDV / Individual consultancy services for preparation and Individual reviewing the RFP of study & Component 2: Infrastructure / Post Consultant Open 60,000.00 0.00 Canceled 2019-07-28 2019-09-15 2019-10-06 2019-11-10 2020-05-08 recommendation for selected Improvements Selection MASL Dams (Rantambe, Victoria, Kothmale) (IWWRMP/PP/CONS/32) LK-MOMDE-121782-CS- INDV / Consultancy for Individual Preparation of guideline for Component 2: Infrastructure / Post Consultant Limited 12,121.21 0.00 Canceled 2019-09-18 2019-09-23 2019-10-14 2019-11-18 2020-05-16 sustainable Dam safety and Improvements Selection Hydraulic Assert (IWWRMP/PP/CONS/07) LK-MOMDE-138929-CS- INDV / Consultancy services Individual Component 2: Infrastructure for Preparation of TOR for / Post Consultant Limited 8,426.97 0.00 Canceled 2020-05-29 2020-06-03 2020-06-24 2020-07-29 2021-07-29 Improvements River Basin Management Plan Selection (IWWRMP-2/CS/IC/20) LK-MOMDE-162970-CS- INDV / Consultancy service for Preparation of Environmental Social Management Framework and Individual Component 2: Infrastructure Pending Environmental social / Post Consultant Limited 11,235.96 0.00 2020-08-03 2020-08-08 2020-08-15 2020-08-29 2020-11-27 Improvements Implementation screening report for Selection Rehabilitation of Wadamunai tank & Lunugamwehera Reservoir (IWWRMP- 2/CS/QCBS/15) LK-MOMDE-118665-CS- INDV / Training program on Individual Procurement (Evaluation of Component 4: Project Pending / Post Consultant Limited 6,060.61 0.00 2020-11-15 2020-11-20 2020-12-11 2021-01-15 2021-01-22 Consultancy, Goods and Management Implementation Selection Works) (IWWRMP/PP/CONS/41) LK-MOMDE-184063-CS- INDV / Short-term Individual Component 4: Project assignment for Personal IDA / 66190 Post Consultant Limited 2,500.00 0.00 Under Review 2020-07-15 2020-07-15 2020-07-18 2020-07-15 2020-08-01 2020-09-05 2021-03-04 Management Assistant Selection (IWWRMP/PP/CONS/17) Page 12 PROCUREMENT PLAN (Textual Part) Project information: Country: Bolivia Project name: Health Service Delivery Network Project P-number: P164453 Project Implementation Agencies: UGESPRO and AISEM Date of the Procurement Plan: May 22, 2018 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised in November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures acceptable for the Bank by the may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable. Other Relevant Procurement Information. Procurement activities will be undertaken by AISEM for Component 1 and part of Component 3; and by the PIU within UGESPRO for Components 2 and part of Component 3. Procurement of Goods, Works and Non-Consulting Services. According the Project Procurement Strategy for Development (PPSD), the open international competitive bidding approach should be applied when the Procurement Plan establishes it, while for small contracts the open national competitive bidding approach is supported by the availability of bidders in the local market. Procurement for hospitals to be carried out by AISEM will be under turn-key contracts with functional technical specifications. For Procurement to be carried out by the PIU within UGESPRO the Borrower is able to specify detailed requirements to which bidders respond by offering bids; the Request for Bids or the Request for Quotations would be the selection methods for these contracts. Procurement of Consulting Services. Technical Assistance, designs, supervision services, and other studies: Considering that these will be small contracts, the suitable market approach would be an open competition in the national market or direct market approach, while the Quality-Cost- Based Selection or the Consultant’s Qualification Based Selection (considering the nature of the services and the need to take into account the quality of the proposals based on the evaluation of the different solutions and the cost of the services), or Direct Selection (when a sole firm with needed capabilities is identified and justified) would be the selection methods. For the construction supervision firm contract for the third level hospital in La Paz, the approach would be an open competition in the international market. Project implementation support personnel. Individuals contracted to support project implementation (project staff), other than individual consulting positions identified in the Legal Agreement, may be selected by the Borrower according to their personnel hiring procedures for such activities, as reviewed and found acceptable by the Bank and described in the POMs. Individual consultants. Individual consultants will be selected for an assignment for which: (i) a team of experts is not required; (ii) no additional office support is required; and (iii) the experience and qualifications of the individual are of paramount requirement. The evaluation shall be based on the relevant qualifications and experience of the individual consultant in accordance with provision of paragraphs 7.34 to 7.39 of the Procurement Regulations for IPF Borrowers issued in July 2016 and revised in November 2017. PROCUREMENT Bolivia : Health Service Delivery Network Project PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2018-05-24 Revised Plan Date(s): (comma delineated, leave blank if none)2021-05-17 Project ID: P164453 GPN Date: 2019-02-11 Project Name: Health Service Delivery Network Project Loan / Credit No: / , IBRD / 88680 Executing Agency(ies):Agency of Infrastructure in Health and Medical Equipment WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Signed Contract No. Approach Process n (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned BM/AISEM/004 / Construccion y Strengthening Health Open - Single Stage - One 72,000,000 2019-04- 2019-05- 2019-06- 2019-08- 2019-09- 2023-07- IBRD / 88680 Prior Request for Bids 0.00 Canceled equipamiento Hospital de Service Delivery Networks International Envelope .00 29 09 20 19 23 31 3er Nivel de la ciudad de La Paz BM/AISEM/007 / Construccion y Strengthening Health Open - Single Stage - One 14,000,000 2019-11- 2019-11- 2020-01- 2020-03- 2020-04- 2023-07- IBRD / 88680 Prior Request for Bids 0.00 Canceled equipamiento Hospital de Service Delivery Networks International Envelope .00 11 21 02 02 06 29 2do Nivel de la Red Caranavi BM/AISEM/008 / Construccion y Strengthening Health Open - Single Stage - One 14,000,000 2019-11- 2019-11- 2020-01- 2020-03- 2020-04- 2023-07- IBRD / 88680 Prior Request for Bids 0.00 Canceled equipamiento Hospital de Service Delivery Networks International Envelope .00 11 21 02 02 06 29 2do Nivel de la Red Quillacollo BM/AISEM/009 / Strengthening Health Open - Single Stage - One 10,000,000 2019-11- 2019-11- 2020-01- 2020-03- 2020-04- 2023-07- Construccion y IBRD / 88680 Prior Request for Bids 0.00 Canceled Service Delivery Networks International Envelope .00 11 21 02 02 06 29 equipamiento Hospital de 2do Nivel Uncia BM/AISEM/072 / Pending Construcción de la Unidad Strengthening Health Single Stage - One 4,956,268. 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2020-06- IBRD / 88680 Post Request for Bids Open - National 0.00 Implement de Emergencia del Hospital Service Delivery Networks Envelope 00 01 06 05 19 24 20 ation de Clínicas BM/AISEM/071 / Construcción del Edificio de Contingencia para la Strengthening Health Single Stage - One 576,439.2 2019-03- 2019-09- 2019-03- 2019-04- 2019-09- 2019-05- 2019-10- 2019-06- 2019-11- 2019-10- IBRD / 88680 Post Request for Bids Open - National 581,731.50 Signed Unidad de Emergencias del Service Delivery Networks Envelope 3 25 09 30 29 27 13 08 17 22 15 Hospital de Clínicas Universitario de La Paz BM/AISEM/027/2020 / MEJORAMIENTO DE Pending INFRAESTRUCTURA EN Request for Single Stage - One 2020-02- 2020-04- 2020-10- IBRD / 88680 Project Management Post Open - National 145,773.00 0.00 Implement ESTABLECIMIENTOS DE Quotations Envelope 25 21 18 ation SALUD DE PRIMER NIVEL DEL MUNICIPIO DE LA PAZ BM/AISEM/005 / Diseño, Construcción, Equipamiento y Puesta en Marcha de los Strengthening Health Open - Single Stage - One 31,289,958 2019-10- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- Establecimientos de Salud IBRD / 88680 Prior Request for Bids 0.00 Canceled Service Delivery Networks International Envelope .00 30 04 16 15 19 17 Hospitalarios de 2do Nivel de los Municipios de San Ignacio de Velasco y Warnes del Departamento de Santa Cruz, por Lotes. BM/AISEM/006 / Diseño, Construccion, Equipamiento y Puesta en Marcha por Lotes de Strengthening Health Open - Single Stage - One 43,589,741 2019-10- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IBRD / 88680 Prior Request for Bids 0.00 Canceled Establecimientos de Salud Service Delivery Networks International Envelope .00 30 04 16 15 19 17 Hospitalarios de 2do Nivel del Municipio de la Guardia - Municipio de San Julian y Puerto Villarroel BM/AISEM/030/2020 / Contratacion LLave en Mano (Diseño, Construcción, Strengthening Health Open - Single Stage - One 28,000,000 Under 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- Equipamiento y Puesta en IBRD / 88680 Prior Request for Bids 0.00 Service Delivery Networks International Envelope .00 Review 04 09 20 20 24 21 marcha de Dos (2) Establecimientos de Salud Hospitalario de Segundo Nivel San Ignacio de Velasco y San Julián BM/AISEM/031/2020 / Contratación Llave en Mano (Diseño, Construcción, Equipamiento y Puesta en Strengthening Health Open - Single Stage - One 28,000,000 2020-03- 2020-03- 2020-04- 2020-05- 2020-07- 2020-12- IBRD / 88680 Prior Request for Bids 0.00 Canceled Marcha de Dos (2) Service Delivery Networks International Envelope .00 11 16 27 27 01 28 Establecimientos de Salud Hospitalario de Segundo Nivel La Guardia - Warnes GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned Actual BM/AISEM/059 / 2018-09- 2018-09- 2018-10- 2019-04- / Project Management Post Direct Selection Direct 10,000.00 0.00 Canceled Adquisicion de Licencia 03 08 13 11 Sistema Contable Pending BM/AISEM/060 / Sistema Single Stage - One 2019-04- 2019-04- 2019-06- 2019-07- 2019-08- 2020-02- IBRD / 88680 Project Management Post Request for Bids Open - National 50,000.00 0.00 Implementa de Gestión de Proyectos Envelope 15 20 01 01 05 01 tion BM/AISEM/065 / Sistema Pending de comunicacion en linea, Request for Single Stage - One 2019-03- 2019-05- 2019-07- IBRD / 88680 Project Management Post Open - National 20,000.00 0.00 Implementa incluye GPS y sistemas de Quotations Envelope 16 11 10 tion ubicacion, medicion y otros Request for Single Stage - One 2018-11- 2019-01- 2019-06- BM/AISEM/063 / Servidor / Project Management Post Open - National 15,000.00 0.00 Canceled Quotations Envelope 06 01 30 BM/AISEM/064 / Request for Single Stage - One 2018-09- 2018-11- 2019-04- / Project Management Post Open - National 21,394.75 0.00 Canceled Impresoras, escaner, Quotations Envelope 06 01 30 plotter, y otros BM/AISEM/066/2019 / Request for Single Stage - One 2019-06- 2019-07- 2019-06- 2019-10- ADQUISICION DE IBRD / 88680 Project Management Post Open - National 33,750.00 25,656.31 Signed Quotations Envelope 02 28 28 26 MOBILIARIO, ESTANTES Y OTROS BM/AISEM/066 / Request for Single Stage - One 2019-03- 2019-05- 2019-08- Mobiliario, estantes, mesa IBRD / 88680 Project Management Post Open - National 33,870.00 0.00 Canceled Quotations Envelope 16 11 09 de reuniones y otros BM/AISEM/062/2019 / Adquisicion de Equipos de Request for Single Stage - One 2019-06- 2019-07- 2019-06- 2020-01- IBRD / 88680 Project Management Post Open - National 45,025.00 15,184.38 Signed Computación, Impresoras y Quotations Envelope 05 31 19 27 Escaner de Mesa BM-AISEM -118/2019 / Adquisición de Equipos de Computación Estacionario Request for Single Stage - One 2019-06- 2019-08- 2019-07- 2020-02- tipo II, Impresora láser de IBRD / 88680 Project Management Post Open - National 29,412.54 23,223.77 Signed Quotations Envelope 17 12 08 08 Alto Tráfio, Impresora Láser de mediano tráfico, Escáner de mesa de mediano tráfico BM-AISEM -119/2019 / Request for Single Stage - One 2019-07- 2019-08- 2019-08- 2020-02- Adquisicion de Impresoras IBRD / 88680 Project Management Post Open - National 5,800.00 5,347.79 Signed Quotations Envelope 06 31 05 27 y Escaner de Mesa BM/AISEM/125/2019 / ADQUISICION DE EQUIPAMIENTO PARA CENTROS DE SALUD DE PRIMER NIVEL DEL Pending Single Stage - One 2019-10- 2019-10- 2019-12- 2020-01- 2020-02- 2020-08- DEPARTAMENTO DE LA PAZ IBRD / 88680 Project Management Post Request for Bids Open - National 244,169.00 0.00 Implementa Envelope 16 21 02 01 05 03 DOS LOTES - LOTE 1 tion EQUIPAMIENTO DE LABORATORIO Y LOTE 2 EQUIPAMIENTO PARA EL AREA DE PARTOS BM/AISEM/124/2019 / Adquisicion de Under Open - Single Stage - One 2019-10- 2020-03- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- Equipamiento de IBRD / 88680 Project Management Prior Request for Bids 728,863.00 0.00 Implementa International Envelope 28 09 02 14 13 17 15 Imagenologia para Centros tion de Salud de Primer Nivel del Departamento de La Paz BM/AISEM/040/2020 / ADQUISICION DE CAMARAS Strenthening Public Health DE AISLAMIENTO (100) Request for Single Stage - One 2020-04- 2020-04- 2020-04- IBRD / 88680 Emergency Response to Post Open - National 2,040,817.00 0.00 Canceled PARA LA RESPUESTA A Quotations Envelope 01 03 30 COVID-19 EMERGENCIAS DE SALUD PUBLICA BM/AISEM/039/2020 / Strenthening Public Health ADQUISICIÓN DE EQUIPOS Request for Single Stage - One 2020-04- 2020-04- 2020-04- IBRD / 88680 Emergency Response to Post Open - National 7,871,721.00 0.00 Canceled MOBILES DE RAYOS "X" (30) Quotations Envelope 01 03 30 COVID-19 Y ULTRASONIDO (100). BM/AISEM/042/2020 / ADQUISICION DE EQUIPO Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- DE OXIGENOTERAPIA PARA IBRD / 88680 Emergency Response to Post Open - National 14,386,269.00 0.00 Canceled Quotations Envelope 01 03 30 LA RESPUESTA A COVID-19 EMERGENCIAS DE SALUD PUBLICA BM/AISEM/46/2020 / ADQUISICION DE EQUIPAMIENTO DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- RESPALDO DE SUMINISTRO IBRD / 88680 Emergency Response to Post Open - National 1,224,490.00 0.00 Canceled Quotations Envelope 01 03 30 ELECTRICO PARA LA COVID-19 RESPUESTA A EMERGENCIAS DE SALUD PUBLICA (UPSs) BM/AISEM/050/2020 / ADQUISICIÓN DE EQUIPAMIENTO MÉDICO DE Strenthening Public Health INTERNACIÓN (OXÍMETRO Request for Single Stage - One 2020-04- 2020-04- 2020-04- IBRD / 88680 Emergency Response to Post Open - National 577,406.00 0.00 Canceled DE PULSO (1080), LINTERNA Quotations Envelope 01 03 30 COVID-19 DE OBS. (500) Y OTROS) PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/045/2020 / ADQUISICIÓN DE FREZZERS PARA CONSERVACIÓN DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- REACTIVOS DE IBRD / 88680 Emergency Response to Post Open - National 43,732.00 0.00 Canceled Quotations Envelope 01 03 30 DIAGNOSTICO PARA LA COVID-19 RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/037/2020 / ADQUISICION DE EQUIPAMIENTO DE MONITORIZACION DE SIGNOS VITALES DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- PACIENTES EN TERAPIA IBRD / 88680 Emergency Response to Post 16,518,951.00 0.00 Canceled Quotations Envelope 01 03 30 INTENSIVA (MONITORES COVID-19 MULTIPARAMETRICOS MODULARES (500), CENTRAL DE MONITOREO (125) Y OTROS BM/AISEM/038/2020 / ADQUISICION DE EQUIPAMIENTO MEDICO PARA TERAPIA INTENSIVA Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- (ASPIRADORES 1000) IBRD / 88680 Emergency Response to Post Open - National 14,040,817.00 0.00 Canceled Quotations Envelope 01 03 30 BOMBAS DE INFUSION COVID-19 (3500) Y OTROS PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/041/2020 / ADQUISICIÓN DE EQUIPAMIENTO PARA TRIAGE, TERAPIA INTERMEDIA E INTENSIVA Strenthening Public Health (BOLSAS DE REANIMACIÓN Request for Single Stage - One 2020-04- 2020-04- 2020-04- IBRD / 88680 Emergency Response to Post Open - National 3,208,193.00 0.00 Canceled (625), ESTETOSCOPIOS Quotations Envelope 01 03 30 COVID-19 (900), VIDEOLARINGOSCOPIOS (100), TENSIÓMETROS (300), Y OTROS) PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/043/2020 / ADQUISICIÓN DE EQUIPAMIENTO DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- LABORATORIO IBRD / 88680 Emergency Response to Post Open - National 1,275,511.00 0.00 Canceled Quotations Envelope 01 03 30 (GASOMETRO (125), PARA COVID-19 LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA Page 1 BM/AISEM/044/2020 / ADQUISICIÓN DE CAMAS, CAMILLAS Y OTRO EQUIPAMIENTO PARA TERAPIA INTENSIVA (CAMA Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- DE TERAPIA INTENSIVA IBRD / 88680 Emergency Response to Post Open - National 7,266,764.00 0.00 Canceled Quotations Envelope 01 03 30 (500), CAMILLAS DE COVID-19 TRANSPORTE (700), MESA MAYO (1.000), Y OTROS) PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/048/2020 / ADQUISICIÓN PARA LA GESTIÓN DE CADAVERES y RESIDUOS HOSPITALARIOS (INCINERADOR DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- CADAVERES (5), CAMARAS IBRD / 88680 Emergency Response to Post Open - National 5,109,330.00 0.00 Canceled Quotations Envelope 01 03 30 FRIGORIFICAS (2), COVID-19 ESTERILIZADOR DE RESIDUOS (12) Y OTROS PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/049/2020 / ADQUISICIÓN DE MOBILIARIO PARA INTERNACIÓN TERAPIA Strenthening Public Health INTERMEDIA (CAMA DE Request for Single Stage - One 2020-04- 2020-04- 2020-04- IBRD / 88680 Emergency Response to Post Open - National 2,319,826.00 0.00 Canceled INTERNACIÓN (1080), MESA Quotations Envelope 01 03 30 COVID-19 DE ALIMENTACIÓN (1080), PORTA SUEROS (1080) Y OTROS PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/047/2020 / ADQUISICION DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- AUTOCLAVES (100) PARA IBRD / 88680 Emergency Response to Post Open - National 3,206,998.00 0.00 Canceled Quotations Envelope 01 03 30 LA RESPUESTA A COVID-19 EMERGENCIAS DE SALUD PUBLICA BM/AISEM/043/2020-1 / ADQUISICIÓN DE EQUIPAMIENTO DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-06- LABORATORIO IBRD / 88680 Emergency Response to Post Limited 1,275,511.00 1,176,825.74 Completed Quotations Envelope 01 01 13 13 18 15 (GASOMETRO (125), PARA COVID-19 LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/042/2020-1 / ADQUISICION DE EQUIPO Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-08- DE OXIGENOTERAPIA PARA IBRD / 88680 Emergency Response to Post Limited 14,386,269.00 2,114,186.55 Completed Quotations Envelope 01 01 13 16 18 20 LA RESPUESTA A COVID-19 EMERGENCIAS DE SALUD PUBLICA BM/AISEM/050/2020-1 / ADQUISICIÓN DE EQUIPAMIENTO MÉDICO DE Strenthening Public Health INTERNACIÓN (OXÍMETRO Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-07- IBRD / 88680 Emergency Response to Post Limited 577,406.00 373.10 Signed DE PULSO (1080), LINTERNA Quotations Envelope 01 01 13 13 12 03 COVID-19 DE OBS. (500) Y OTROS) PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/048/2020-1 / ADQUISICIÓN PARA LA GESTIÓN DE CADAVERES y RESIDUOS HOSPITALARIOS (INCINERADOR DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-06- CADAVERES (5), CAMARAS IBRD / 88680 Emergency Response to Post Limited 5,109,330.00 2,138,467.10 Signed Quotations Envelope 01 01 13 21 18 15 FRIGORIFICAS (2), COVID-19 ESTERILIZADOR DE RESIDUOS (12) Y OTROS PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/047/2020-1 / ADQUISICION DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-06- AUTOCLAVES (100) PARA IBRD / 88680 Emergency Response to Post Limited 3,206,998.00 2,348,517.72 Signed Quotations Envelope 01 01 13 13 18 15 LA RESPUESTA A COVID-19 EMERGENCIAS DE SALUD PUBLICA BM/AISEM/041/2020-1 / ADQUISICIÓN DE EQUIPAMIENTO PARA TRIAGE, TERAPIA INTERMEDIA E INTENSIVA Strenthening Public Health (BOLSAS DE REANIMACIÓN Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- IBRD / 88680 Emergency Response to Post Limited 3,208,193.00 789,443.24 Completed (625), ESTETOSCOPIOS Quotations Envelope 02 01 13 13 18 13 COVID-19 (900), VIDEOLARINGOSCOPIOS (100), TENSIÓMETROS (300), Y OTROS) PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/049/2020-1 / ADQUISICIÓN DE MOBILIARIO PARA INTERNACIÓN TERAPIA Strenthening Public Health INTERMEDIA (CAMA DE Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-06- IBRD / 88680 Emergency Response to Post Limited 2,319,826.00 816,746.20 Completed INTERNACIÓN (1080), MESA Quotations Envelope 01 01 13 21 18 23 COVID-19 DE ALIMENTACIÓN (1080), PORTA SUEROS (1080) Y OTROS PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/045/2020-1 / ADQUISICIÓN DE FREZZERS PARA CONSERVACIÓN DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- REACTIVOS DE IBRD / 88680 Emergency Response to Post Limited 43,732.00 20,302.24 Signed Quotations Envelope 01 01 13 13 18 DIAGNOSTICO PARA LA COVID-19 RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/037/2020-1 / ADQUISICION DE EQUIPAMIENTO DE MONITORIZACION DE SIGNOS VITALES DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-06- PACIENTES EN TERAPIA IBRD / 88680 Emergency Response to Post Limited 16,518,951.00 12,386,117.15 Completed Quotations Envelope 01 01 13 13 18 22 INTENSIVA (MONITORES COVID-19 MULTIPARAMETRICOS MODULARES (500), CENTRAL DE MONITOREO (125) Y OTROS BM/AISEM/038/2020-1 / ADQUISICION DE EQUIPAMIENTO MEDICO PARA TERAPIA INTENSIVA Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-06- (ASPIRADORES 1000) IBRD / 88680 Emergency Response to Post Limited 14,040,817.00 8,644,656.55 Signed Quotations Envelope 01 01 13 16 18 19 BOMBAS DE INFUSION COVID-19 (3500) Y OTROS PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/051/2020 / Adquisición de Equipos de Apoyo para la Atención Strenthening Public Health Medica (Tensiómetro Request for Single Stage - One 2020-05- 2020-05- 2020-05- IBRD / 88680 Emergency Response to Post Open - National 18,811.00 0.00 Canceled Digital (50), Termómetro Quotations Envelope 05 15 25 COVID-19 Digital (25), Ambu (13) y Otros en pacientes COVID - 19 en el Municipio de La Paz BM/AISEM/053/2020 / Adquisición de Equipos de Protección Personal (Batas Strenthening Public Health Descartables (15500), Request for Single Stage - One 2020-05- 2020-05- 2020-05- IBRD / 88680 Emergency Response to Post Open - National 119,866.00 0.00 Canceled Mamelucos (3500) Barbijos Quotations Envelope 05 15 25 COVID-19 N95 (2500) y Otros para la Atención en pacientes COVID - 19 en el Municipio de La Paz BM/AISEM/054/2020 / Adquisición de Equipo de Strenthening Public Health Flujómetros de Pared (15) Request for Single Stage - One 2020-05- 2020-05- 2020-05- IBRD / 88680 Emergency Response to Post Open - National 985.00 0.00 Canceled para la Atenciónn en Quotations Envelope 05 15 25 COVID-19 Pacientes COVID - 19 en el Municipio de La Paz BM/AISEM/055/2020 / Adquisición de Equipos de Strenthening Public Health Curación (6) y Coolers (2) Request for Single Stage - One 2020-05- 2020-05- 2020-05- IBRD / 88680 Emergency Response to Post Open - National 7,173.00 0.00 Canceled para la Atención en Quotations Envelope 05 15 25 COVID-19 Pacientes COVID - 19 en el Municipio de La Paz BM/AISEM/056/2020 / Adquisición de Equipamiento Medico Strenthening Public Health Bomba de Infusión a Jeringa Request for Single Stage - One 2020-05- 2020-05- 2020-05- IBRD / 88680 Emergency Response to Post Open - National 475,948.00 0.00 Canceled (24) Ventilador Mecánico Quotations Envelope 05 15 25 COVID-19 con Turbina (6) y Otros para la Atención en Pacientes COVID - 19 en el Municipio de La Paz BM/AISEM/058/2020 / Adquisición de Equipos de Computación (5) Strenthening Public Health Pending Request for Single Stage - One 2020-05- 2020-05- 2020-05- Computadora Portátil (1) e IBRD / 88680 Emergency Response to Post Open - National 11,000.00 0.00 Implementa Quotations Envelope 05 15 25 Impresoras (3) en apoyo COVID-19 tion para la Atención en Pacientes COVID - 19 en el Municipio de La Paz BM/AISEM/057/2020 / Adquisición de Rayos "X" y Strenthening Public Health Request for Single Stage - One 2020-05- 2020-05- 2020-05- Ecógrafo para la Atención IBRD / 88680 Emergency Response to Post Open - National 215,744.00 0.00 Canceled Quotations Envelope 05 15 25 en Pacientes COVID - 19 en COVID-19 el Municipio de La Paz BM/AISEM/052/2020 / Adquisición de Mesa Mayo Strenthening Public Health (27) y Camas de Transporte Request for Single Stage - One 2020-05- 2020-05- 2020-05- IBRD / 88680 Emergency Response to Post Open - National 16,546.00 0.00 Canceled (2) para la Atención en Quotations Envelope 05 15 25 COVID-19 Pacientes COVID - 19 en el Municipio de La Paz BM/AISEM/059/2020 / ADQUISICION DE BOMBAS DE INFUSION (1000), Strenthening Public Health Request for Single Stage - One 2020-05- 2020-05- 2020-06- MONITOR BASICO (480) Y IBRD / 88680 Emergency Response to Prior Open - National 5,994,170.00 0.00 Canceled Quotations Envelope 14 26 05 ASPIRADOR DE COVID-19 SECRECIONES (700) PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA COVID 19 BM/AISEM/064/2020 / ADQUISICION DE CAMARAS Strenthening Public Health FRIGORIFICAS (2) PARA LA Request for Single Stage - One 2020-05- 2020-05- 2020-06- IBRD / 88680 Emergency Response to Post Open - National 218,659.00 0.00 Canceled RESPUESTA A EMERGENCIAS Quotations Envelope 14 25 04 COVID-19 DE SALUD PUBLICA COVID - 19 BM/AISEM/044/2020-1 / ADQUISICIÓN DE CAMAS, CAMILLAS Y OTRO EQUIPAMIENTO PARA TERAPIA INTENSIVA (CAMA Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-04- 2020-04- 2020-06- 2020-07- DE TERAPIA INTENSIVA IBRD / 88680 Emergency Response to Post Limited 7,266,764.00 689,732.47 Completed Quotations Envelope 01 01 13 13 12 20 (500), CAMILLAS DE COVID-19 TRANSPORTE (700), MESA MAYO (1.000), Y OTROS) PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA BM/AISEM/46/2020-1 / ADQUISICION DE EQUIPAMIENTO DE Strenthening Public Health Request for Single Stage - One 2020-04- 2020-04- 2020-05- RESPALDO DE SUMINISTRO IBRD / 88680 Emergency Response to Post Limited 1,224,490.00 0.00 Canceled Quotations Envelope 01 13 18 ELECTRICO PARA LA COVID-19 RESPUESTA A EMERGENCIAS DE SALUD PUBLICA (UPSs) BM/AISEM/089/2020 / Strenthening Public Health Request for Single Stage - One 2020-07- 2020-07- 2020-09- REACTIVOS DE IBRD / 88680 Emergency Response to Post Open - National 12,115,889.00 0.00 Canceled Quotations Envelope 13 29 12 DIAGNOSTICO MOLECULAR COVID-19 COVID - 19 BM/AISEM/090/2020 / Strenthening Public Health Request for Single Stage - One 2020-07- 2020-07- 2020-09- INSUMOS PARA IBRD / 88680 Emergency Response to Post Open - National 1,755,102.00 0.00 Canceled Quotations Envelope 20 31 14 DIAGNOSTICO MOLECULAR COVID-19 COVID - 19 BM/AISEM/091/2020 / Strenthening Public Health Request for Single Stage - One 2020-07- 2020-07- 2020-08- INSUMOS PARA EQUIPOS IBRD / 88680 Emergency Response to Post Open - National 862,974.00 0.00 Canceled Quotations Envelope 13 26 25 PCR 7500 FAST COVID-19 BM/AISEM/092/2020 / Strenthening Public Health Request for Single Stage - One 2020-07- 2020-07- 2020-08- INSUMOS DE LABORATORIO IBRD / 88680 Emergency Response to Post Open - National 2,451,895.00 0.00 Canceled Quotations Envelope 15 25 24 CLINICO APOYO A COVID- COVID-19 19 Page 2 BM/AISEM/095/2020 / EQUIPOS DE PROTECCIÓN PERSONAL 15500 BATAS Strenthening Public Health DESCARTABLES, 3500 Request for Single Stage - One 2020-07- 2020-07- 2020-08- IBRD / 88680 Emergency Response to Post Open - National 119,865.00 0.00 Canceled MAMELUCOS, 2500 Quotations Envelope 08 23 22 COVID-19 BARBIJOS N9 PARA LA ATENCIÓN EN PACIENTES COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/097/2020 / ADQUISICION DE SEIS (6) Strenthening Public Health EQUIPOS DE CURACION Request for Single Stage - One 2020-07- 2020-07- 2020-09- 2020-08- 2020-10- IBRD / 88680 Emergency Response to Post Open - National 6,997.00 2,540.97 Completed PARA LA ATENCIÓN EN Quotations Envelope 09 23 09 22 09 COVID-19 PACIENTES COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/098/2020 / EQUIPAMIENTO MEDICO 24 BOMBA DE INFUSION A Strenthening Public Health Under JERINGA, 2 VENTILADOR Request for Single Stage - One 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- IBRD / 88680 Emergency Response to Post Open - National 265,598.00 33,967.39 Implementa MECANICO CON TURBINA Quotations Envelope 10 26 13 25 11 COVID-19 tion PARA LA ATENCIÓN EN PACIENTES COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/099/2020 / EQUIPOS DE COMPUTACION 5 EQUIPO DE Strenthening Public Health COMPUTACION, 1 Request for Single Stage - One 2020-07- 2020-08- 2020-08- 2020-08- 2020-09- IBRD / 88680 Emergency Response to Post Open - National 10,787.00 9,595.97 Completed COMPUTADORA PORTATIL Quotations Envelope 24 10 17 18 07 COVID-19 Y 3 IMPRESORAS EN APOYO PARA LA ATENCIÓN EN PACIENTES COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/104/2020 / EQUIPOS PARA PROCESAMIENTO DE MUESTRAS EN DIAGNOSTICO MOLECULAR Strenthening Public Health Request for Single Stage - One 2020-07- 2020-07- 2020-09- COVID - 19 IBRD / 88680 Emergency Response to Post Open - National 1,611,808.00 0.00 Canceled Quotations Envelope 14 27 05 (15)TERMOCICLADOR PCR COVID-19 (6) EQ AUTOM PARA EXTRACC (13) MICROCENTRIF REFRIGERADA (13) MICROCENTRIFUGA (13 CENTRIFUGA DE MESA BM/AISEM/105/2020 / EQUIPAMIENTO DE LABORATORIO ESPECIALIZADO EN Strenthening Public Health DIAGNÓSTICO MOLECULAR Request for Single Stage - One 2020-07- 2020-07- 2020-09- IBRD / 88680 Emergency Response to Post Open - National 613,703.00 0.00 Canceled (9) CABINA DE PCR (7) Quotations Envelope 12 24 07 COVID-19 CABINA DE FLUJO LAMINAR (15) REFRIGERADOR (15) CONGELADOR DE BAJA TEMPERATURA (13) VORTEX DIGITAL BM/AISEM/129/2020 / ADQUISICION DE Strenthening Public Health Request for Single Stage - One 2020-08- 2020-08- 2020-09- 2020-08- 2020-09- MEDICAMENTOS PARA IBRD / 88680 Emergency Response to Post Open - National 3,617,711.37 811,457.56 Completed Quotations Envelope 05 21 02 26 17 TRATAMIENTO COVID-19 AMBULATORIO COVID - 19 BM/AISEM/134/2020 / ADQUISICIÓN KIT SARS- CoV-2 (7000); KIT DE EXTRACCIÓN DE RNA Strenthening Public Health Request for Single Stage - One 2020-07- 2020-08- 2020-09- (2688); TERMOCICLADOR IBRD / 88680 Emergency Response to Post Open - National 14,523,032.07 0.00 Canceled Quotations Envelope 30 19 21 PCR EN TIEMPO REAL (15); COVID-19 EQUIPO AUTOMATIZADO DE EXTRACCIÓN DE ÁCIDOS NUCLEICOS (15) BM/AISEM/135/2020 / ADQUISICIÓN DE MEDIOS Strenthening Public Health DE TRANSPORTE VIRAL Request for Single Stage - One 2020-08- 2020-09- 2021-03- IBRD / 88680 Emergency Response to Post Open - National 4,897,959.18 0.00 Canceled UNIVERSAL PARA Quotations Envelope 04 29 28 COVID-19 DIAGNÓSTICO MOLECULAR COVID-19 (6720) BM/AISEM/145/2020 / ADQUISICIÓN DE CABINA DE FLUJO LAMINAR (7), CABINA DE PCR (9), CONGELADOR DE BAJA Strenthening Public Health Pending TEMPERATURA (15), Request for Single Stage - One 2020-08- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Open - National 782,361.52 0.00 Implementa REFRIGERADOR TIPO 1 (15), Quotations Envelope 09 04 02 COVID-19 tion REFRIGERADOR TIPO 2 (15), MICROCENTRIFUGA REFRIGERADA (13), MICROCENTRIFUGA (13), CENTRIFUGA DE MESA Y VORTEX DIGITAL (13) PARA BM/AISEM/158/2020 / ADQUISICIÓN DE DNAZAP (20), RNASA (20), CAJAS DE ALMACENAMIENTO CRIOGÉNICO (1500), TAPAS Strenthening Public Health ÓPTICAS (550) TUBOS EN Request for Single Stage - One 2020-08- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Open - National 2,640,816.33 0.00 Canceled TIRAS (550), MICROPLACAS Quotations Envelope 25 20 18 COVID-19 ÓPTICAS 96 POCILLOS (500), GUANTES DE NITRILO (12000), PUNTAS CON FILTRO (6200), TUBOS TIPO EPPENDORF (8000). BM/AISEM/128/2020_ / PROVISIÓN DE OXÍGENO MEDICINAL (LÍQUIDO CRIOGÉNICO PARA TANQUE Y GASEOSO PARA Strenthening Public Health Request for Single Stage - One 2020-08- 2020-08- 2020-09- 2020-08- 2021-03- 2021-01- BOTELLÓN) PARA LOS IBRD / 88680 Emergency Response to Post Limited 349,016.91 347,242.92 Completed Quotations Envelope 24 21 30 27 29 14 SERVICIOS DE TERAPIA COVID-19 INTENSIVA, TERAPIA INTERMEDIA, INTERNACION Y EMERGENCIAS - HOSPITAL 3ER NIVEL EL ALTO SUR (CONTINGENCIA COVID-19) BM/AISEM/160/2020 / ADQUISICIÓN DE ENVASES Strenthening Public Health Request for Single Stage - One 2020-08- 2020-08- 2020-10- 2020-09- 2021-04- DE PLÁSTICO PARA IBRD / 88680 Emergency Response to Post Limited 32,798.83 23,930.38 Signed Quotations Envelope 29 25 24 17 22 DISTRIBUCIÓN DE COVID-19 MEDICAMENTOS COVID-19 (150000) BM/AISEM/162/2020 / ADQUISICIÓN DE ACETAMINOFEN (2.250.000), ANTIGRIPAL Strenthening Public Health Request for Single Stage - One 2020-08- 2020-10- 2021-04- (2.250.000), ÁCIDO IBRD / 88680 Emergency Response to Post Limited 1,446,428.57 0.00 Canceled Quotations Envelope 30 25 23 ACETIL SALICÍLICO COVID-19 (1.500.000), OMEPRAZOL (3.000.000) Y OMEGA 3 (1.500.000) BM/AISEM/203/2020 / ADQUISICIÓN DE EQUIPOS DE COMPUTACIÓN (3) Y Pending Request for Single Stage - One 2020-12- 2021-01- 2021-01- ESCÁNER (1) DE MEDIANO IBRD / 88680 Project Management Post Open - National 7,287.90 0.00 Implementa Quotations Envelope 11 15 22 TRAFICO”, PARA EL EQUIPO tion DE APOYO DEL PROYECTO REDES DE SERVICIOS DE SALUD BM/AISEM/061 / Single Stage - One 2019-05- 2019-05- 2019-07- 2019-08- 2019-09- 2019-11- Adquisicion de 2 IBRD / 88680 Project Management Post Request for Bids Open - National 70,000.00 0.00 Canceled Envelope 20 25 06 05 09 08 camionetas para el proyecto BM/AISEM/116/2020 / ADQUISICIÓN DE MONITOR Strenthening Public Health DESFIBRILADOR EN APOYO Request for Single Stage - One 2020-07- 2020-08- 2020-09- IBRD / 88680 Emergency Response to Post Open - National 8,748.00 0.00 Canceled PARA LA ATENCIÓN EN Quotations Envelope 22 02 01 COVID-19 PACIENTES COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/111/2020 / Adquisición de Equipos de Request for Single Stage - One 2020-07- 2020-07- 2020-08- Rayos X Portátil para la IBRD / 88680 Project Management Post Open - National 4,518,950.00 0.00 Canceled Quotations Envelope 17 27 26 Atención de Pandemia a Nivel Nacional BM/AISEM/063/2020 / ADQUISICION DE EQUIPO DE RESPALDO DE Strenthening Public Health Request for Single Stage - One 2020-05- 2020-05- 2020-06- SUMINISTRO ELECTRICO IBRD / 88680 Emergency Response to Post Open - National 244,898.00 0.00 Canceled Quotations Envelope 14 25 04 PARA LA RESPUESTA A COVID-19 EMERGENCIAS DE SALUD PUBLICA COVID - 19 (UPSs) BM/AISEM/096/2020 / EQUIPO DE 15 Strenthening Public Health Request for Single Stage - One 2020-07- 2020-07- 2020-08- FLUJOMETROS DE PARED IBRD / 88680 Emergency Response to Post Open - National 984.00 0.00 Canceled Quotations Envelope 06 11 10 PARA LA ATENCIÓN EN COVID-19 PACIENTES COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/093/2020 / EQUIPOS DE APOYO PARA LA ATENCIÓN MEDICA 10 Strenthening Public Health TENSIOMETRO DIGITAL, 15 Request for Single Stage - One 2020-07- 2020-07- 2020-08- IBRD / 88680 Emergency Response to Post Open - National 7,149.00 0.00 Canceled TERMÓMETRO DIGITAL, 3 Quotations Envelope 10 28 27 COVID-19 AMBU EN PACIENTES COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/061/2020 / ADQUISICION DE CAMAS (1105), MESAS DE ALIMENTACION (1580), Strenthening Public Health Request for Single Stage - One 2020-05- 2020-05- 2020-06- CARROS DE TRANSPORTE IBRD / 88680 Emergency Response to Post Open - National 4,780,088.00 0.00 Canceled Quotations Envelope 14 25 04 DE ROPA (1774), VELADOR COVID-19 (1080) CHATAS (500) Y MESA MAYO (124) PARA LA RESPUESTA A EMERGENCIAS BM/AISEM/094/2020 / 25 MESA MAYO Y 2 CAMAS DE Strenthening Public Health TRANSPORTE PARA LA Request for Single Stage - One 2020-07- 2020-07- 2020-08- IBRD / 88680 Emergency Response to Post Open - National 16,399.00 0.00 Canceled ATENCIÓN EN PACIENTES Quotations Envelope 06 14 13 COVID-19 COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/163/2020 / ADQUISICIÓN DE ACETAMINOFEN (2.250.000), ANTIGRIPAL Strenthening Public Health Request for Single Stage - One 2020-08- 2020-10- 2021-04- (2.250.000), ÁCIDO IBRD / 88680 Emergency Response to Post Open - National 1,446,428.57 0.00 Canceled Quotations Envelope 31 26 24 ACETIL SALICÍLICO COVID-19 (1.500.000), OMEPRAZOL (3.000.000) Y OMEGA 3 (1.500.000) BM/AISEM/062 / Equipos de computacion, Single Stage - One 2019-03- 2019-03- 2019-04- 2019-05- 2019-07- 2019-09- IBRD / 88680 Project Management Post Request for Bids Open - National 85,695.00 0.00 Canceled accesorios, servidor, Envelope 11 16 27 27 01 29 impresoras, escaner y otros BM/AISEM/065/2020 / ADQUISICION DE FREEZER PARA LABORATORIO (10) Y Strenthening Public Health Request for Single Stage - One 2020-05- 2020-05- 2020-06- DESTRUCTOR DE AGUJAS IBRD / 88680 Emergency Response to Post Open - National 72,887.00 0.00 Canceled Quotations Envelope 14 25 04 (75) PARA LA RESPUESTA A COVID-19 EMERGENCIAS DE SALUD PUBLICA COVID - 19 BM/AISEM/115/2020 / ADQUISICIÓN DE LAMPARA GERMICIDA (3), Strenthening Public Health TERMÓMETROS (200) Y Request for Single Stage - One 2020-07- 2020-08- 2020-09- IBRD / 88680 Emergency Response to Post Open - National 8,850.00 0.00 Canceled MASCARILLAS (100) EN Quotations Envelope 22 02 01 COVID-19 APOYO PARA LA ATENCIÓN EN PACIENTES COVID - 19 EN EL MUNICIPIO DE LA PAZ BM/AISEM/060/2020 / ADQUISICION DE BOLSA DE REANIMACION (625), GUIAS Strenthening Public Health DE INTUBACION (124), Request for Single Stage - One 2020-05- 2020-05- 2020-06- IBRD / 88680 Emergency Response to Post Open - National 787,683.00 0.00 Canceled LARINGOSCOPIOS (134) Quotations Envelope 13 25 04 COVID-19 PARA LA RESPUESTA A EMERGENCIAS DE SALUD PUBLICA COVID - 19 BM / AISEM / 058 / 2021 / PROVISION DE OXIGENO MEDICINAL (LIQUIDO CRIOGENICO PARA TANQUE Y GASEOSO PARA Strenthening Public Health Pending BOTELLON) PARA LOS Request for Single Stage - One 2021-02- 2021-04- 2021-06- IBRD / 88680 Emergency Response to Post Limited 304,837.14 0.00 Implementa SERVICIOS DE TERAPIA Quotations Envelope 25 03 02 COVID-19 tion INTENSIVA, TERAPIA INTERMEDIA , INTERNACION Y EMERGENCIAS - HOSPITAL DE TERCER NIVEL EL ALTO SUR 2021 (CONTINGENCIA COVIT-19) NON CONSULTING SERVICES Page 3 Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned Actual BM/AISEM/101/2020 / SERVICIOS DE Strenthening Public Health Request for Single Stage - One 2020-07- 2020-07- 2020-12- ALIMENTACION, IBRD / 88680 Emergency Response to Post Open - National 314,701.00 0.00 Canceled Quotations Envelope 06 18 31 LAVANDERÍA Y LIMPIEZA COVID-19 PARA EL CENTRO DE AISLAMIENTO COVID-19 EN LA PAZ BM/AISEM/109/2020 / RR HH EN SALUD 59 P UTIs 58 P HOSP/URG D HOSP GERM BUSCH RIBER GUAYARAM EX COSSMIL RURRBQUE 4 P Strenthening Public Health Pending 2020-07- 2020-07- 2020-07- 2020-10- LAB, 96 P EL SEDES Y REDES IBRD / 88680 Emergency Response to Post Direct Selection Direct 754,946.00 0.00 Implementa 04 06 09 07 D SALUD Y 30 P EL CEN D COVID-19 tion AISLAM P FORTALECER RESP DEL SIST SANIT DEL DEPTO DEL BENI ANTE LA EMERG D SALUD PUB POR EL COVID 19 BM/AISEM/113/2020 / 2do REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-07- 2020-07- 2020-08- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 267,383.00 0.00 Implementa SALUD EN EL 15 15 03 29 COVID-19 tion DEPARTAMENTO DE SANTA CRUZ: 49 PARA UTI Y 9 PARA LABORATORIOS BM/AISEM/102/2020 / RR.HH. EN SALUD PARA LA PAZ: 51 PARA LA UTI Y 40 PARA HOSPITALIZACION/URGENC Strenthening Public Health Pending IAS DEL HOSPITAL DE 3ER 2020-07- 2020-07- 2020-07- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 391,913.00 0.00 Implementa NIVEL EL ALTO NORTE PARA 01 06 09 07 COVID-19 tion FORTALECER LA RESPUESTA DEL SISTEMA SANITARIO DEL DEPTO DE LA PAZ ANTE LA EMERGENCIA DE SALUD PUBLICA POR EL COVID 19 BM/AISEM/106/2020 / RR.HH EN SALUD: 31 P UTIs 76 P HOSP/URG DE HOSP VIRGEN DE CHAGUAYA S ANTONIO Y FRAY Strenthening Public Health 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-10- QUEBRACHO 4 P LAB 88 P IBRD / 88680 Emergency Response to Post Direct Selection Direct 681,373.00 103,348.04 Signed 04 01 09 01 13 02 11 EL SEDES Y REDES DE COVID-19 SALUD Y 31 P EL CENT DE AISLAM P FORT LA RESP DEL SIST SANIT DEL DEPTO D TARIJA ANTE LA EMERG DE SALUD PUB POR EL COVID 19 BM/AISEM/107/2020 / RR HH EN SALUD 56 PARA UTIs 39 PARA HOSPIT. URGENCIAS DE HOSPITALES DEL SUD, SOLOMON KLEIN Strenthening Public Health Pending Y VIEDMA y 4 PARA 2020-07- 2020-07- 2020-07- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 412,917.00 0.00 Implementa LABORATORIOS, PARA 04 20 22 20 COVID-19 tion FORTALECER LA RESPUESTA DEL SISTEMA SANITARIO DEL DEPTO DE COCHABAMBA ANTE LA EMERGENCIA DE SALUD PUBLICA POR EL COVID 19 BM/AISEM/108/2020 / RR.HH EN SALUD PARA UTIs, 157 PARA HOSPIT/ URGENCIAS DE LOS HOSPITALES SAN JUAN DE Strenthening Public Health Pending DIOS Y CIESO 2 PARA 2020-07- 2020-07- 2020-07- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 950,739.00 0.00 Implementa LABORATORIOS, PARA 04 06 09 07 COVID-19 tion FORTALECER LA RESPUESTA DEL SISTEMA SANITARIO DEL DEPARTAMENTO DE ORURO ANTE LA EMERGENCIA DE SALUD PUBLICA POR EL COVID 19 BM/AISEM/086/2020 / RR.HH. EN SALUD PARA MONTERO 36 PARA LA UTI HOSPITAL DE MONTERO Y 45 PARA LA RED DE SALUD Strenthening Public Health Pending OBISPO SANTISTEVAN 2020-07- 2020-07- 2020-07- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 307,510.00 0.00 Implementa MONTERO PARA 01 06 10 08 COVID-19 tion FORTALECER LA RESPUESTA DEL SISTEMA SANITARIO DEL DTO DE SANTA CRUZ ANTE LA EMERGENCIA DE SALUD PUBLICA POR EL COVID 19 BM/AISEM/087/2020 / RR.HH EN SALUD 100 P UTI's 74 P. HOSP URG D HOSP S PEDRO CLAVER, STA BARBARA HOSP DEL NINO Strenthening Public Health Pending 2020-07- 2020-07- 2020-07- 2020-10- MONTEAG Y CAMARGO 16 IBRD / 88680 Emergency Response to Post Direct Selection Direct 758,793.00 0.00 Implementa 01 06 08 06 P EL SEDES Y RED D SALUD COVID-19 tion Y 4 P CENT D AISLAM, P FORT LA RESP D SIST SANIT DEL DEPTO D CHUQUISACA ANTE LA EMERG DE SALUD PUB X EL COV19 BM/AISEM/114/2020 / 2do Requerimiento de Strenthening Public Health Pending RR.HH. en Salud para 2020-07- 2020-07- 2020-07- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 83,597.00 0.00 Implementa Cochabamba: 22 para 15 15 20 18 COVID-19 tion Hospitalización/Urgencias - Licenciadas en Enfermeria BM/AISEM/117/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-07- 2020-07- 2020-07- 2020-10- SALUD PARA CHUQUISACA: IBRD / 88680 Emergency Response to Post Direct Selection Direct 129,652.92 0.00 Implementa 22 27 31 29 14 PARA UTI, 7 COVID-19 tion HOSPITALIZACION/URGENC IAS, 8 MONITOREO Y VIGILANCIA Y 3 LABORATORIO BM/AISEM/118/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD PARA TARIJA: 54 Strenthening Public Health PARA UTI, 42 PARA 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 536,539.94 390,086.00 Signed HOSPITALIZACION/URGENC 22 22 27 22 31 30 29 COVID-19 IAS DEL HOSPITAL SAN JUAN DE DIOS, 2 PARA LABORATORIO, 42 PARA REDES DE SALUD Y 7 PARA EL CENTRO DE AISLAMIENTO BM/AISEM/119/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-07- 2020-07- 2020-07- 2020-10- SALUD PARA EL IBRD / 88680 Emergency Response to Post Direct Selection Direct 59,908.16 0.00 Implementa 22 27 31 29 DEPARTAMENTO DE BENI: COVID-19 tion 25 PARA EL MONITOREO Y VIGILANCIA EPIDEMIOLOGICA - GUAYARAMERIN BM/AISEM/085/2020 / RR.HH. EN SALUD PARA EL HOSPITAL MUNICIPAL LA PORTADA Y EL CENTRO DE AISLAMIENTO DE LA PAZ, Strenthening Public Health Under 2020-07- 2020-06- 2020-07- 2020-06- 2020-07- 2020-10- PARA FORTALECER LA IBRD / 88680 Emergency Response to Post Direct Selection Direct 691,795.00 0.00 Implementa 01 30 06 30 10 08 RESPUESTA DEL SISTEMA COVID-19 tion SANITARIO DEL MUNICIPIO DE LA PAZ ANTE LA EMERGENCIA DE SALUD PUBLICA POR EL COVID 19 BM/AISEM/121/2020 / CONTRATACIÓN DE EQUIPO ADMINISTRATIVO TÉCNICO Strenthening Public Health PARA LA CODIFICACIÓN, 2020-07- 2020-09- 2020-07- 2020-09- 2020-08- 2020-10- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 13,812.24 13,378.24 Signed IDENTIFICACIÓN Y 23 23 28 23 01 02 30 COVID-19 REGISTRO DE EQUIPAMIENTO MÉDICO ADQUIRIDO A NIVEL NACIONAL BM/AISEM/124/2020 / 3er REQUERIMIENTO DE Strenthening Public Health Pending 2020-07- 2020-07- 2020-08- 2020-10- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 120,681.34 0.00 Implementa 24 29 02 31 SALUD SANTA CRUZ: 24 COVID-19 tion PARA UTI DEL HOSPITAL JAPONES BM/AISEM/125/2020 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD BENI: 41 PARA UTI, Strenthening Public Health Pending 2020-07- 2020-07- 2020-08- 2020-10- 66 IBRD / 88680 Emergency Response to Post Direct Selection Direct 509,444.17 0.00 Implementa 24 29 02 31 HOSPITALIZACION/URGENC COVID-19 tion IAS, 7 SEDES Y REDES, 17 MONITOREO Y VIGILANCIA Y 19 PARA CENTRO DE AISLAMIENTO BM/AISEM/126/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-07- 2020-07- 2020-08- 2020-10- SALUD SANTA CRUZ: 4 IBRD / 88680 Emergency Response to Post Direct Selection Direct 373,013.27 0.00 Implementa 24 29 02 31 PARA REDES, 108 COVID-19 tion MONITOREO Y VIGILANCIA Y 43 PARA CENTRO DE AISLAMIENTO BM/AISEM/127/2020 / 1er REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD POTOSI: 33 PARA Strenthening Public Health Pending 2020-07- 2020-07- 2020-08- 2020-10- UTI, 23 HOSPITALIZACION IBRD / 88680 Emergency Response to Post Direct Selection Direct 815,228.13 0.00 Implementa 24 29 02 31 (CENTRO SEVILLA), 2 COVID-19 tion LABORATORIO, 20 SEDES Y REDES, 161 MONITOREO Y VIGILANCIA, 33 CENTRO DE AISLAMIENTO BM/AISEM/130/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD PARA LA PAZ: 11 2020-07- 2020-07- 2020-08- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 161,767.35 0.00 Implementa PARA LA UTI Y 22 PARA 24 29 02 31 COVID-19 tion HOSPITALIZACIÓN/URGENC IAS DEL HOSPITAL DE TERCER NIVEL EL ALTO SUR BM/AISEM/131/2020 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-07- 2020-08- 2020-08- 2020-11- SALUD SANTA CRUZ: 15 IBRD / 88680 Emergency Response to Post Direct Selection Direct 32,825.95 0.00 Implementa 29 03 07 05 PARA MONITOREO Y COVID-19 tion VIGILANCIA EQPIDEMIOLOGICA (MONTERO) BM/AISEM/132/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD PANDO: 71 2020-07- 2020-08- 2020-08- 2020-11- IBRD / 88680 Emergency Response to Post Direct Selection Direct 344,467.35 0.00 Implementa HOSPITALIZACION/URGENC 29 03 07 05 COVID-19 tion IAS HOSPITAL HERNAN MESUTI Y 36 PARA CENTRO DE AISLAMIENTO BM/AISEM/122/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-07- 2020-10- SALUD PARA EL HOSPITAL IBRD / 88680 Emergency Response to Post Direct Selection Direct 45,753.94 45,521.70 Signed 23 20 28 15 01 27 30 EL ALTO NORTE - COVID-19 DEPARTAMENTO LA PAZ: 6 PARA UTI, 1 PARA HOSPITALIZACION BM/AISEM/136/2020 / 6to REQUERIMIENTO DE Strenthening Public Health 2020-07- 2020-07- 2020-08- 2020-07- 2020-09- 2020-07- 2021-03- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 76,927.26 71,861.24 Signed 30 30 04 30 08 30 07 SALUD SANTA CRUZ: 17 COVID-19 PARA UTI HOSPITAL DE MONTERO BM/AISEM/137/2020 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-07- 2020-08- 2020-09- 2021-03- SALUD COCHABAMBA: 9 IBRD / 88680 Emergency Response to Post Direct Selection Direct 458,992.57 0.00 Implementa 30 04 08 07 PARA UTI, 51 COVID-19 tion HOSPITALIZACION, 1 SEDES Y REDES, 108 MONITOREO Y VIGILANCIA BM/AISEM/138/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-07- 2020-08- 2020-09- 2021-03- SALUD BENI: 10 PARA IBRD / 88680 Emergency Response to Post Direct Selection Direct 243,986.15 0.00 Implementa 30 04 08 07 HOSPITALIZACION (HOSP. COVID-19 tion SAN BORJA), 1 PARA SEDES Y 91 MONITOREO Y VIGILANCIA BM/AISEM/139/2020 / 7mo REQUERIMIENTO DE Strenthening Public Health 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2021-03- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 294,408.45 152,521.43 Signed 04 30 09 04 13 07 12 SALUD SANTA CRUZ: 66 COVID-19 PARA UTI DEL HOSPITAL SAN JUAN DE DIOS Page 4 BM/AISEM/140/2020 / 1er REQUERIMIENTO DE Strenthening Public Health Pending 2020-08- 2020-08- 2020-09- 2021-03- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 23,317.78 0.00 Implementa 04 09 13 12 SALUD LA PAZ - SEDES: 6 COVID-19 tion PARA BRIGADAS DE ACCION RAPIDA BM/AISEM/141/2020 / 5to REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-08- 2020-08- 2020-09- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 208,047.81 0.00 Implementa SALUD BENI: 1 PARA UTI, 04 09 13 12 COVID-19 tion 19 HOSPITALIZACION Y 60 MONITOREO Y VIGILANCIA BM/AISEM/142/2020 / 3er REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-08- 2020-08- 2020-09- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 179,329.15 0.00 Implementa SALUD PANDO: 79 PARA 04 09 13 12 COVID-19 tion MONITOREO Y VIGILANCIA DE CASOS SOSPECHOSOS BM/AISEM/144/2020 / 8vo REQUERIMIENTO DE Strenthening Public Health RECURSOS HUMANOS EN 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 116,673.76 111,493.55 Signed SALUD SANTA CRUZ: 15 04 31 09 18 13 18 12 COVID-19 PARA UTI, 3 HOSPITALIZACION (HOSP. BAJIO) Y 8 SEDES Y REDES BM/AISEM/146/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD POTOSI: 62 PARA 2020-08- 2020-08- 2020-09- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 725,787.46 0.00 Implementa UTI, 55 HOSPITALIZACION 04 09 13 12 COVID-19 tion (CENTRO SEVILLA), 98 REDES - MONITOREO Y VIGILANCIA, 5 CENTRO DE AISLAMIENTO BM/AISEM/147/2020 / 6to REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-08- 2020-08- 2020-09- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 187,524.93 0.00 Implementa SALUD BENI: 15 PARA UTI, 07 12 16 15 COVID-19 tion 16 HOSPITALIZACION Y 30 MONITOREO Y VIGILANCIA BM/AISEM/148/2020 / 9no REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-08- 2020-08- 2020-09- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 268,718.22 0.00 Implementa SALUD SANTA CRUZ: 45 07 12 16 15 COVID-19 tion PARA UTI, 12 PARA FARMACIA Y LABORATORIO DEL HOSPITAL DEL NIÑO BM/AISEM/150/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-08- 2020-08- 2020-09- 2021-03- SALUD SEDES LA PAZ: 31 IBRD / 88680 Emergency Response to Post Direct Selection Direct 1,338,270.70 0.00 Implementa 11 16 20 19 PARA SEDES Y REDES - 479 COVID-19 tion MONITOREO Y VIGILANCIA, 53 CENTRO DE AISLAMIENTO BM/AISEM/151/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD COCHABAMBA: 47 2020-08- 2020-08- 2020-09- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 340,239.36 0.00 Implementa PARA UTI, 35 11 16 20 19 COVID-19 tion HOSPITALIZACION, 25 MONITOREO Y VIGILANCIA Y 17 PARA EL CENTRO DE AISLAMIENTO BM/AISEM/152/2020 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-08- 2020-08- 2020-09- 2021-03- SALUD PARA EL HOSPITAL IBRD / 88680 Emergency Response to Post Direct Selection Direct 144,411.52 0.00 Implementa 12 17 21 20 EL ALTO NORTE - COVID-19 tion DEPARTAMENTO LA PAZ: 28 PARA UTI, 12 PARA HOSPITALIZACION BM/AISEM/154/2020 / 10mo REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-08- 2020-08- 2020-09- 2021-03- SALUD SANTA CRUZ: 5 IBRD / 88680 Emergency Response to Post Direct Selection Direct 631,367.49 0.00 Implementa 13 18 22 21 PARA SEDES Y REDES, 270 COVID-19 tion MONITOREO Y VIGILANCIA Y 2 PARA CENTRO DE AISLAMIENTO BM/AISEM/155/2020 / 11vo REQUERIMIENTO DE Strenthening Public Health RECURSOS HUMANOS EN 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-08- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 3,020.12 3,000.43 Signed SALUD SANTA CRUZ: 1 14 14 19 27 23 28 22 COVID-19 PARA MONITOREO Y VIGILANCIA EPIDEMIOLOGICA (MONTERO) BM/AISEM/156/2020 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2020-08- 2020-08- 2020-09- 2021-03- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 455,104.37 0.00 Implementa 14 19 23 22 SALUD ORURO: 192 PARA COVID-19 tion MONITOREO Y VIGILANCIA BM/AISEM/157/2020 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD PARA CHUQUISACA: Strenthening Public Health Under 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2021-03- 35 PARA UTI, 25 IBRD / 88680 Emergency Response to Post Direct Selection Direct 583,571.72 20,788.99 Implementa 20 18 25 18 29 28 HOSPITALIZACION/URGENC COVID-19 tion IAS, 126 MONITOREO Y VIGILANCIA, 1 REDES Y 18 CENTRO DE AISLAMIENTO BM/AISEM/159/2020 / 12vo REQUERIMIENTO DE Strenthening Public Health 2020-08- 2020-08- 2020-08- 2020-08- 2020-10- 2020-08- 2021-04- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 116,860.50 109,738.37 Signed 24 20 29 28 03 28 01 SALUD SANTA CRUZ: 24 COVID-19 PARA UTI DEL HOSPITAL JAPONES (DOMO 1) BM/AISEM/143/2020 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD PARA LA PAZ: 2 2020-08- 2020-08- 2020-09- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 26,469.53 0.00 Implementa PARA LA UNIDAD DE 04 09 13 12 COVID-19 tion TERAPIA INTENSIVA Y 2 PARA HOSPITALIZACION/URGENC IAS DEL HOSPITAL DE TERCER NIVEL EL ALTO SUR BM/AISEM/161/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD PARA CHUQUISACA: Strenthening Public Health Pending 2020-08- 2020-08- 2020-10- 2021-04- 47 PARA UTI, 34 IBRD / 88680 Emergency Response to Post Direct Selection Direct 495,223.47 0.00 Implementa 25 30 04 02 HOSPITALIZACION/URGENC COVID-19 tion IAS, 52 MONITOREO Y VIGILANCIA Y 26 CENTRO DE AISLAMIENTO BM/AISEM/164/2020 / Strenthening Public Health 13vo REQUERIMIENTO DE 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 4,059.18 4,032.73 Signed RECURSOS HUMANOS EN 01 01 06 08 11 10 09 COVID-19 SALUD SANTA CRUZ: 1 PARA LABORATORIOS BM/AISEM/165/2020 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Under SALUD G.A.M.L.P.: 30 PARA 2020-09- 2020-09- 2020-09- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 738,252.77 0.00 Implementa UTI, 166 PARA 01 02 06 11 09 COVID-19 tion HOSPITALIZACION/URGENC IAS DEL HOSPITAL MUNICIPAL COTAHUMA BM/AISEM/166/2020 / 7mo REQUERIMIENTO DE Strenthening Public Health Under 2020-09- 2020-09- 2020-09- 2020-10- 2021-04- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 4,059.18 0.00 Implementa 03 02 08 13 11 SALUD BENI: 1PARA EQUIPO COVID-19 tion DE APOYO AL SEDES BENI BM/AISEM/168/2020 / 5to REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-09- 2020-09- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 23,378.57 0.00 Implementa SALUD COCHABAMBA: 11 03 08 13 11 COVID-19 tion PARA HOSPITALIZACION HOSP. SOLOMON KLEIN BM/AISEM/103/2020 / 1ER REQ. DE RR.HH EN SALUD PARA LA PAZ 72 PARA LA UTI Y 135 PARA HOSPITALIZACION/URGENC Strenthening Public Health Pending IAS DEL HOSPITAL DE 3ER 2020-07- 2020-07- 2020-07- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 842,354.00 0.00 Implementa NIVEL EL ALTO SUR, PARA 02 02 07 05 COVID-19 tion FORTALECER LA RESPUESTA DEL SISTEMA SANITARIO DEL DEPTO DE LA PAZ ANTE LA EMERGENCIA DE SALUD PUBLICA POR EL COVID 19 BM/AISEM/169/2020 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-09- 2020-09- 2020-10- 2021-04- SALUD PARA EL SEDES LP IBRD / 88680 Emergency Response to Post Direct Selection Direct 370,961.37 0.00 Implementa 07 12 17 15 HOSPITAL DE CLÍNICAS LA COVID-19 tion PAZ: 43 PARA UTI, 46 PARA HOSPITALIZACION BM/AISEM/170/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD PANDO: 84 PARA Strenthening Public Health Pending 2020-09- 2020-09- 2020-10- 2021-04- UTI, 32 IBRD / 88680 Emergency Response to Post Direct Selection Direct 583,893.59 0.00 Implementa 07 12 17 15 HOSPITALIZACION/URGENC COVID-19 tion IAS, 9 PARA SEDES Y REDES, 17 MONITOREO Y VIGILANCIAS Y 15 PARA CENTRO DE AISLAMIENTO BM/AISEM/171/2020 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-09- 2020-09- 2020-10- 2021-04- SALUD ORURO: 36 PARA IBRD / 88680 Emergency Response to Post Direct Selection Direct 1,022,199.27 0.00 Implementa 08 13 18 16 UTI, 110 PARA COVID-19 tion HOSPITALIZACION, 16 PARA SEDES Y REDES y 154 PARA CENTROS DE AISLAMIENTO. BM/AISEM/167/2020 / 8vo REQUERIMIENTO DE Strenthening Public Health Under RECURSOS HUMANOS EN 2020-09- 2020-09- 2020-09- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 8,118.37 0.00 Implementa SALUD BENI: 2 11 09 16 21 19 COVID-19 tion BIOQUIMICOS PARA LABORATORIO COVID 19 TRINIDAD. BM/AISEM/172/2020 / 14vo REQUERIMIENTO DE Strenthening Public Health RECURSOS HUMANOS EN 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 66,475.80 62,357.83 Signed SALUD SANTA CRUZ: 18 11 08 16 21 21 21 19 COVID-19 PARA HOSPITALIZACION (HOSP. BAJIO) BM/AISEM/173/2020 / 3er REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-09- 2020-09- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 77,994.31 0.00 Implementa SALUD G.A.M.L.P.: 28 PARA 15 20 25 23 COVID-19 tion EL CENTRO DE AISLAMIENTO COVID - LA PAZ BM/AISEM/174/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD PARA EL SEDES LP 2020-09- 2020-09- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 308,733.24 0.00 Implementa INSTITUTO NACIONAL DEL 15 20 25 23 COVID-19 tion TORAX LA PAZ: 1 PARA UTI, 79 PARA HOSPITALIZACION, 9 PARA LABORATORIO Y FARMACIA BM/AISEM/175/2020 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD PARA EL SEDES LP 2020-09- 2020-09- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 164,490.09 0.00 Implementa HOSPITAL DE LA MUJER LA 15 20 25 23 COVID-19 tion PAZ: 3 PARA UTI, 34 PARA HOSPITALIZACION Y 2 PARA LABORATORIO Y FARMACIA BM/AISEM/177/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD PARA LA PAZ: 10 2020-09- 2020-09- 2020-10- 2021-04- IBRD / 88680 Emergency Response to Post Direct Selection Direct 225,052.92 0.00 Implementa PARA LA UTI Y 42 PARA 17 22 27 25 COVID-19 tion HOSPITALIZACION/URGENC IAS DEL HOSPITAL DE TERCER NIVEL EL ALTO SUR BM/AISEM/178/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-09- 2020-09- 2020-11- 2021-05- SALUD PARA EL HOSPITAL IBRD / 88680 Emergency Response to Post Direct Selection Direct 290,057.58 0.00 Implementa 23 28 02 01 EL ALTO NORTE - LA PAZ: COVID-19 tion 36 PARA UTI, 27 PARA HOSPITALIZACION Y 6 PARA LABORATORIO Page 5 BM/AISEM/179/2020 / 7mo REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Under 2020-09- 2020-09- 2020-09- 2020-09- 2020-11- 2021-05- SALUD PARA EL SEDES LP IBRD / 88680 Emergency Response to Post Direct Selection Direct 65,528.57 0.00 Implementa 23 22 28 30 02 01 INAMEN - HEMOCENTRO : COVID-19 tion 11 PARA HOSPITALIZACION Y 10 PARA LABORATORIO BM/AISEM/180/2020 / 6to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2020-09- 2020-09- 2020-11- 2021-05- SALUD PARA EL SEDES LP IBRD / 88680 Emergency Response to Post Direct Selection Direct 46,536.30 0.00 Implementa 23 28 02 01 HOSPITAL MUNICIPAL LOS COVID-19 tion ANDES - EL ALTO : 11 PARA HOSPITALIZACION BM/AISEM/181/2020 / 15vo REQUERIMIENTO DE Strenthening Public Health 2020-09- 2020-09- 2020-09- 2020-09- 2020-11- 2020-10- 2021-05- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 17,146.36 17,034.61 Signed 23 21 28 30 02 01 01 SALUD SANTA CRUZ: 4 COVID-19 PARA UTI DEL HOSPITAL DEL NIÑO BM/AISEM/182/2020 / 16vo REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health SALUD PARA SANTA CRUZ 2020-09- 2020-09- 2020-09- 2020-09- 2020-11- 2020-10- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 101,832.07 101,173.88 Signed MUNICIPIO LA GUARDIA: 1 23 22 28 30 02 01 01 COVID-19 PARA HOSPITALIZACION/URGENC IAS, 36 CENTRO DE AISLAMIENTO BM/AISEM/183/2020 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD G.A.M.L.P.: 10 PARA 2020-09- 2020-09- 2020-11- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 271,489.07 0.00 Implementa UTI, 55 PARA 23 28 02 01 COVID-19 tion HOSPITALIZACION Y 5 PARA LABORATORIO Y FARMACIA DEL HOSPITAL MUNICIPAL LA PORTADA BM/AISEM/184/2020 / SERVICIO DE TRADUCCIÓN DE PROTOCOLO PARA Strenthening Public Health Pending Request for Single Stage - One 2020-09- 2020-11- 2021-05- ABORDAJE DE COVID-19 EN IBRD / 88680 Emergency Response to Post Open - National 4,081.63 0.00 Implementa Quotations Envelope 28 23 22 PUEBLOS INDÍGENAS, COVID-19 tion ORIGINARIOS, CAMPESINOS Y AFROBOLIVIANOS BM/AISEM/110/2020 / CONTRATACIÓN DE 1ER REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD PARA EL Strenthening Public Health Pending DEPARTAMENTO DE PANDO 2020-07- 2020-07- 2020-07- 2020-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 413,399.00 0.00 Implementa 64 PARA UNIDADES DE 04 13 15 13 COVID-19 tion TERAPIA INTENSIVA, 41 PARA HOSPITALIZACIÓN/URGENC IAS DE LOS HOSPITALES HERNAN MESUTI Y PERLA DEL ACRE, 4 PARA LABORATORIOS, PARA FORTALECER. BM/AISEM/188/2020 / ADQUISICIÓN DE UN Pending SISTEMA DE INFORMACIÓN Request for Single Stage - One 2020-10- 2020-12- 2021-05- IBRD / 88680 Project Management Post Open - National 4,373.18 0.00 Implementa FINANCIERA PARA EL Quotations Envelope 07 02 31 tion PROYECTO DE REDES DE SERVICIOS DE SALUD. BM/AISEM/189/2020 / 4to REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-10- 2020-10- 2020-11- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 175,154.96 0.00 Implementa SALUD ORURO: 18 PARA 02 07 11 10 COVID-19 tion UTI, 29 PARA HOSPITALIZACION y 8 PARA CENTRO DE AISLAMIENTO BM/AISEM/190/2020 / 17vo REQUERIMIENTO DE Strenthening Public Health RECURSOS HUMANOS EN 2020-10- 2020-10- 2020-10- 2020-10- 2020-11- 2020-10- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 128,579.88 119,688.12 Signed SALUD SANTA CRUZ: 30 02 02 07 20 11 09 10 COVID-19 PARA UTI DEL HOSPITAL JAPONES - EQUIPO 5 BM/AISEM/192/2020 / 8vo REQUERIMIENTO DE Strenthening Public Health 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2021-01- 2020-12- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 8,732.36 8,700.65 Signed 09 07 13 13 13 13 31 SALUD PARA EL SEDES LP COVID-19 HOSPITAL DE CLINICAS LA PAZ: 2 PARA UTI. BM/AISEM/193/2020 / 18vo REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2020-10- 2020-10- 2020-10- 2020-12- IBRD / 88680 Emergency Response to Post Direct Selection Direct 96,055.83 0.00 Implementa SALUD SANTA CRUZ: 12 09 13 13 31 COVID-19 tion PARA UTI Y 17 HOSPITALIZACION DEL HOSPITAL PERCY BOLAND BM/AISEM/194/2020 / 19vo REQUERIMIENTO DE Strenthening Public Health Under 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-12- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 26,551.02 0.00 Implementa 09 07 13 13 13 31 SALUD SANTA CRUZ: 5 COVID-19 tion PARA REDES, 3 MONITOREO Y VIGILANCIA BM/AISEM/195/2020 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD PARA CHUQUISACA: Strenthening Public Health 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-12- 32 PARA UTI, 46 IBRD / 88680 Emergency Response to Post Direct Selection Direct 406,826.97 325,606.40 Signed 09 08 13 13 13 13 31 HOSPITALIZACION/URGENC COVID-19 IAS, 6 LABORATORIO, 48 MONITOREO Y VIGILANCIA Y 2 CENTRO DE AISLAMIENTO BM/AISEM/196/2020 / 20vo REQUERIMIENTO DE Strenthening Public Health RECURSOS HUMANOS EN 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-12- IBRD / 88680 Emergency Response to Post Direct Selection Direct 54,321.43 53,967.38 Signed SALUD PARA SANTA CRUZ: 09 13 13 13 13 13 31 COVID-19 1 PARA UTI, 13 HOSPITALIZACION/URGENC IAS DEL I.O.O.B. BM/AISEM/197/2020 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD POTOSI: 5 PARA UTI, 2020-10- 2020-10- 2020-10- 2020-12- IBRD / 88680 Emergency Response to Post Direct Selection Direct 141,847.38 0.00 Implementa 11 HOSPITALIZACION 12 14 14 31 COVID-19 tion (CENTRO SEVILLA), 43 MONITOREO Y VIGILANCIA, 1 CENTRO DE AISLAMIENTO BM/AISEM/123/2020 / SERVICIO DE Strenthening Public Health Request for Single Stage - One 2020-07- 2020-08- 2020-08- 2020-12- ALIMENTACIÓN, IBRD / 88680 Emergency Response to Post Limited 310,911.08 0.00 Canceled Quotations Envelope 28 03 09 31 LAVANDERÍA Y LIMPIEZA COVID-19 PARA EL CENTRO DE AISLAMIENTO COVI-19 EN LA PAZ BM/AISEM/100/2020 / SERVICIOS DE ALQUILER DE Strenthening Public Health Request for Single Stage - One 2020-07- 2020-07- 2020-12- AMBIENTES PARA CENTRO IBRD / 88680 Emergency Response to Post Open - National 735,168.00 0.00 Canceled Quotations Envelope 06 14 31 DE AISLAMIENTO COVID-19 COVID-19 EN LA PAZ BM/AISEM/176/2020 / SERVICIO DE Strenthening Public Health Request for Single Stage - One 2020-09- 2020-11- 2021-05- ALIMENTACIÓN, IBRD / 88680 Emergency Response to Post Open - National 287,090.38 0.00 Canceled Quotations Envelope 20 15 14 LAVANDERÍA Y LIMPIEZA COVID-19 PARA EL CENTRO DE AISLAMIENTO COVI-19 EN LA PAZ BM/AISEM/007/2021 / 1er REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD COVID - 19 PARA EL HOSPITAL DE TERCER NIVEL Strenthening Public Health Pending 2021-01- 2021-01- 2021-01- 2021-03- DE MONTERO (56 TERAPIA IBRD / 88680 Emergency Response to Post Direct Selection Direct 561,151.31 0.00 Implementa 18 23 27 28 INTENSIVA, 43 COVID-19 tion HOSPITALIZACIÓN, 9 IMAGENOLOGÍA, 6 FARMACIA, 19 LABORATORIO, 6 ESTERILIZACIÓN) SANTA CRUZ - 2021 BM/AISEM/008/2021 / 1er REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2021-01- 2021-01- 2021-01- 2021-03- SALUD COVID - 19 PARA EL IBRD / 88680 Emergency Response to Post Direct Selection Direct 263,059.04 0.00 Implementa 18 23 27 28 HOSPITAL EL SUR DE EL COVID-19 tion ALTO - LA PAZ 75 TERAPIA INTENSIVA Y 44 EMERGENCIAS - 2021 BM/AISEM/010/2021 / 1er REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD COVID - 19 PARA EL Strenthening Public Health Pending 2021-01- 2021-01- 2021-01- 2021-03- HOSPITAL EL NORTE DE EL IBRD / 88680 Emergency Response to Post Direct Selection Direct 284,151.46 0.00 Implementa 18 23 27 28 ALTO - LA PAZ (45 TERAPIA COVID-19 tion INTENSIVA 25 EMERGENCIAS, 39 HOSPITALIZACIÓN Y 24 SERVICIOS DE APOYO) - 2021 BM/AISEM/011/2021 / 1er REQUERIMIENTO DE RRHH Strenthening Public Health Pending EN SALUD COVID - 19 2021-01- 2021-01- 2021-01- 2021-03- IBRD / 88680 Emergency Response to Post Direct Selection Direct 110,760.06 0.00 Implementa PARA EL HOSPITAL DE 18 23 27 28 COVID-19 tion CLÍNICAS - LA PAZ: 36 TERAPIA INTENSIVA - 2021 BM/AISEM/009/2021 / 1er REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2021-01- 2021-01- 2021-01- 2021-03- SALUD COVID - 19 PARA EL IBRD / 88680 Emergency Response to Post Direct Selection Direct 200,606.71 0.00 Implementa 18 23 27 28 HOSPITAL EL SUR DE EL COVID-19 tion ALTO - LA PAZ: 56 HOSPITALIZACIÓN Y 39 SERVICIOS DE APOYO - 2021 BM / AISEM / 012 / 2021 / 1er REQUERIMIENTO DE RRHH EN SALUD COVID - Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- 19 COCHABAMBA PARA 29 IBRD / 88680 Emergency Response to Post Direct Selection Direct 496,999.85 0.00 Implementa 01 06 10 11 ESTABLECIMIENTOS DE COVID-19 tion SALUD DE PRIMER NIVEL (140 RRHH) - 2021 BM / AISEM / 013 / 2021 / 1er REQUERIMIENTO DE RRHH EN SALUD COVID - Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- 19 COCHABAMBA PARA IBRD / 88680 Emergency Response to Post Direct Selection Direct 386,703.79 0.00 Implementa 01 06 10 11 HOSPITAL DEL SUD Y COVID-19 tion HOSPITAL SALOMON KLEIN (108 RRHH) - 2021 BM / AISEM / 014 / 2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 278,354.08 0.00 Implementa 19 COCHABAMBA PARA 01 06 10 11 COVID-19 tion HOSPITAL DEL NORTE Y HOSPITAL VIEDMA (64 RRHH) - 2021 BM / AISEM / 015 /2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 739,973.00 0.00 Implementa 19 ORURO 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL (150 TERAPIA INTENSIVA) - 2021 BM / AISEM / 016 / 2021 / 1er REQUERIMIENTO DE RRHH EN SALUD COVID - Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- 19 ORURO IBRD / 88680 Emergency Response to Post Direct Selection Direct 690,269.00 0.00 Implementa 01 06 10 11 ESTABLECIMIENTOS DE COVID-19 tion SALUD DE TERCER NIVEL (85 EMERGENCIAS Y 106 HOSPITALIZACION) - 2021 BM / AISEM / 017 / 2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 467,264.00 0.00 Implementa 19 POTOSI 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 018 / 2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 256,118.00 0.00 Implementa 19 POTOSI 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 019 /2021 / 1er REQUERIMIENTO DE Strenthening Public Health 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 826,947.00 0.00 Canceled 01 06 10 11 19 TARIJA COVID-19 ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 020 /2021 / 1er REQUERIMIENTO DE Strenthening Public Health 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 146,965.00 0.00 Canceled 01 06 10 11 19 TARIJA COVID-19 ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 Page 6 BM / AISEM / 021 /2021 / 2DO REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 536,767.00 0.00 Implementa 19 SANTA CRUZ 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 022 /2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 58,776.00 0.00 Implementa 01 06 10 11 19 PANDO COVID-19 tion ESTABLECIMIENTOS DE SALUD DE PRIMER NIVEL - 2021 BM / AISEM / 023 / 2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 370,561.00 0.00 Implementa 19 PANDO 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 024/2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 132,458.00 0.00 Implementa 19 CHUQUISACA 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE PRIMER NIVEL - 2021 BM / AISEM / 025/2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 349,358.00 0.00 Implementa 19 CHUQUISACA 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 026/2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 649,966.00 0.00 Implementa 19 CHUQUISACA 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TECER NIVEL - 2021 BM / AISEM / 027/2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 19,518.00 0.00 Implementa 01 06 10 11 19 BENI ESTABLECIMIENTOS COVID-19 tion DE SALUD DE PRIMER NIVEL - 2021 BM / AISEM / 028/2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 815,384.00 0.00 Implementa 01 06 10 11 19 BENI ESTABLECIMIENTOS COVID-19 tion DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 029/2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 130,332.00 0.00 Implementa 01 06 10 11 19 BENI ESTABLECIMIENTOS COVID-19 tion DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 030/2021 / 1er REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 372,008.00 0.00 Implementa 01 06 10 11 19 LA PAZ COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 031/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 990,557.00 0.00 Implementa 01 06 10 11 19 LA PAZ COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 032 / 2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 147,932.00 0.00 Implementa 19 ORURO 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 033/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 17,733.00 0.00 Implementa 01 06 10 11 19 POTOSÍ COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 034/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 16,886.00 0.00 Implementa 01 06 10 11 19 POTOSÍ COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 035/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 143,784.00 0.00 Implementa 01 06 10 11 19 TARIJA COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 036/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 23,417.00 0.00 Implementa 01 06 10 11 19 TARIJA COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 037/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 11,400.00 0.00 Implementa 01 06 10 11 19 PANDO COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 038 /2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 16,240.00 0.00 Implementa 19 CHUQUISACA 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE PRIMER NIVEL - 2021 BM / AISEM / 039/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 77,141.00 0.00 Implementa 19 CHUQUISACA 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 040/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 24,360.00 0.00 Implementa 19 CHUQUISACA 01 06 10 11 COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 041/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 16,757.00 0.00 Implementa 01 06 10 11 19 BENI ESTABLECIMIENTOS COVID-19 tion DE SALUD DE PRIMER NIVEL - 2021 BM / AISEM / 042/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 114,429.00 0.00 Implementa 01 06 10 11 19 BENI ESTABLECIMIENTOS COVID-19 tion DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 043/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 7,013.00 0.00 Implementa 01 06 10 11 19 BENI ESTABLECIMIENTOS COVID-19 tion DE SALUD DE TERCER NIVEL - 2021 BM / AISEM / 044/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 7,013.00 0.00 Implementa 01 06 10 11 19 LA PAZ COVID-19 tion ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL - 2021 BM / AISEM / 045/2021 / 3er REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 215,162.00 0.00 Implementa 01 06 10 11 19 LA PAZ COVID-19 tion ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL - 2021 BM /AISEM / 047 / 2021 / 2do REQUERIMIENTO DE RRHH COVID - (3 UTI, 37 Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- HOSPITALIZACIÓN Y 4 IBRD / 88680 Emergency Response to Post Direct Selection Direct 195,565.01 0.00 Implementa 09 14 18 19 SERVICIOS DE APOYO) COVID-19 tion HOSPITAL DE LA MUJER - 2021 BM / AISEM / 048/2021 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD COVID - (22 UTI, 5 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 161,264.43 0.00 Implementa APOYO DIAGNÓSTICO, 5 09 14 18 19 COVID-19 tion OTROS SERVICIOS) INSTITUTO NACIONAL DE TORAX - LA PAZ - 2021 BM / AISEM / 049/2021 / 2do REQUERIMIENTO DE Strenthening Public Health Pending RRHH EN SALUD COVID - 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 419,725.36 0.00 Implementa 19 PARA EL HOSPITAL DE 09 14 18 19 COVID-19 tion CLINICAS (92 TERAPIA INTENSIVA) LA PAZ - 2021 BM / AISEM / 050/2021 / 3er REQUERIMIENTO DE RRHH EN SALUD COVID - Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- 19 PARA EL HOSPITAL IBRD / 88680 Emergency Response to Post Direct Selection Direct 761,221.57 0.00 Implementa 09 14 18 19 BOLIVIANO JAPONES (138 COVID-19 tion TERAPIA INTENSIVA, 10 CUIDADOS INTERMEDIOS) - 2021 BM / AISEM / 051/2021 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 84 TERAPIA 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 574,497.81 0.00 Implementa INTENSIVA, 30 10 15 19 20 COVID-19 tion HOSPITALIZACIÓN Y 5 EMERGENCIAS PARA HOSPITAL SAN JUAN DE DIOS - SANTA CRUZ - 2021 BM / AISEM / 052/2021 / 4TO REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 13 PARA APOYO Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- DIAGNÓSTICO INSTITUTO IBRD / 88680 Emergency Response to Post Direct Selection Direct 37,931.63 0.00 Implementa 10 15 19 20 NACIONAL DE MEDICINA COVID-19 tion NUCLEAR (DIAGNÓSTICO) DEPARTAMENTAL LA PAZ - 2021 BM / AISEM / 053 / 2021 / 5TO REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 11 PARA 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 48,678.72 0.00 Implementa HOSPITALIZACIÓN DEL 10 15 19 20 COVID-19 tion HOSPITAL DE CLÍNICAS LA PAZ BLOQUE ONCOLOGICO - 2021 BM / AISEM / 054/2021 / 6TO REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 42,068.22 0.00 Implementa SALUD: 8 PARA TERAPIA 10 15 19 20 COVID-19 tion INTENSIVA DEL HOSPITAL DEL NIÑO - LA PAZ - 2021 BM / AISEM / 055 / 2021 / 7mo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 6 TERAPIA INTENSIVA, 5 Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- EMERGENCIAS, 17 IBRD / 88680 Emergency Response to Post Direct Selection Direct 167,602.48 0.00 Implementa 10 15 19 20 HOSPITALIZACIÓN Y 7 COVID-19 tion SERVICOS DE APOYO PARA EL INSTITUTO GASTROENTEROLOGICO BOLIVIANO JAPONES - LA PAZ - 2021 BM / AISEM / 056 / 2021 / 8VO REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 5 SERVICIO DE 2021-02- 2021-02- 2021-02- 2021-05- IBRD / 88680 Emergency Response to Post Direct Selection Direct 20,038.34 0.00 Implementa APOYO PARA EL 10 15 19 20 COVID-19 tion HEMOCENTRO-BANCO DE SANGRE DE REFERENCIA DEPARTAMENTAL - LA PAZ - 2021 Page 7 BM / AISEM / 057 / 2021 / 9no REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2021-02- 2021-02- 2021-02- 2021-05- SALUD: 69 IBRD / 88680 Emergency Response to Post Direct Selection Direct 237,413.27 0.00 Implementa 17 22 26 27 HOSPITALIZACIÓN Y 7 COVID-19 tion APOYO DIAGNÓSTICO PARA EL HOSPITAL DE CLINICAS - LA PAZ 2021 BM / AISEM / 059 / 2021 / 3er REQUERIMIENTO RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 21 SAN IGNACIO, 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 217,604.08 0.00 Implementa 11 MAGDALENA, 13 22 27 03 01 COVID-19 tion HUACARAJE Y 24 BAURES PARA CENTROS DE SALUD DE PRIMER NIVEL BENI 2021 BM / AISEM / 060 / 2021 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 14 SAN JOAQUIN, 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 198,964.72 0.00 Implementa 17 SAN RAMÓN Y 30 22 27 03 01 COVID-19 tion SANTA ANA PARA ESTABLECIMIENTOS DE SALUD DE PRIMER NIVEL BENI 2021 BM / AISEM / 061 / 2021 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 18 REYES, 12 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 188,933.03 0.00 Implementa SANTA ROSA, 15 SAN 22 27 03 01 COVID-19 tion BORJA Y 12 YUCUMO PARA ESTABLECIMIENTOS DE SALUD DE PRIMER NIVEL BENI 2021 BM / AISEM / 062 / 2021 / 6to REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 30,526.53 0.00 Implementa 22 27 03 01 SALUD: 9 HOSPITAL COVID-19 tion GENERAL RIBERALTA BENI 2021 BM / AISEM / 063 / 2021 / 3er REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 223,362.68 0.00 Implementa SALUD: 15 ENTRE RÍOS Y 23 28 04 02 COVID-19 tion 45 CERCADO PARA FORTALECIMIENTO TARIJA BM / AISEM / 064 / 2021 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 12 SAN LORENZO, 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 240,838.34 0.00 Implementa 11 CARAPARÍ, 4 23 28 04 02 COVID-19 tion YUNCHARA, 32 YACUIBA Y 7 PADCAYA PARA FORTALECIMIENTO TARIJA 2021 BM / AISEM / 065 / 2021 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 11 EL PUENTE, 17 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 259,480.76 0.00 Implementa VILLAMONTES, 23 BERMEJO 23 28 04 02 COVID-19 tion Y 18 URONDO A PARA FORTALECIMIENTO TARIJA 2021 BM / AISEM / 066 / 2021 / 7mo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 2 PUERTO SILES, 2 Strenthening Public Health Pending SAN JOAQUIN, 9 SANTA 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 165,969.97 0.00 Implementa ANA, 3 RURREBABAQUE, 3 23 28 04 02 COVID-19 tion REYES, 3 SANTA ROSA, 11 RIBERALTA, 7 GUAYARAMERÍN, Y 9 SAN BORJA PARA BRIGADAS BENI 2021 BM / AISEM / 067 / 2021 / 8vo REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 3 SAN ANDRÉS, 35 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 177,494.17 0.00 Implementa TRINIDAD, 9 SAN IGNACIO 23 28 04 02 COVID-19 tion DE MOXOS, 4 BAURES, 4 MAGDALENA PARA FORTALECIMIENTO BENI 2021 BM / AISEM / 068 / 2021 / 2do REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 16 PUERTO Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- VILLARROEL, 12 ENTRE IBRD / 88680 Emergency Response to Post Direct Selection Direct 219,701.46 0.00 Implementa 23 28 04 02 RÍOS, 16 VILLA TUNARI, 20 COVID-19 tion SACABA Y 4 COLOMI PARA FORTALECIMIENTO COCHABAMBA 2021 BM / AISEM / 069 / 2021 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 16 QUILLACOLLO, 8 Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- VINTO, 12 TIQUIPAYA, 10 IBRD / 88680 Emergency Response to Post Direct Selection Direct 213,239.65 0.00 Implementa 23 28 04 02 COLCAPIRHIA, 12 PUNATA COVID-19 tion Y 8 ARANI PARA FORTALECIMIENTO COCHABAMBA 2021 BM / AISEM / 070 / 2021 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Under 2021-02- 2021-03- 2021-02- 2021-03- 2021-06- SALUD: 10 CLIZA, 8 IBRD / 88680 Emergency Response to Post Direct Selection Direct 90,465.31 0.00 Implementa 23 01 28 04 02 TARATA, 8 TOCO, 2 COVID-19 tion BOLIVAR/CARPANI PARA FORTALECIMIENTO COCHABAMBA 2021 BM / AISEM / 071 / 2021 / 3er REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 193,001.46 0.00 Implementa SALUD: 54 CERCADO PARA 23 28 04 02 COVID-19 tion FORTALECIMIENTO ORURO 2021 BM / AISEM / 072 / 2021 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 3 ANDAMARCA, 2 BELÉN DE ANDAMARCA, 2 CHOQUECOTA, 3 CORQUE, Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- 4 EL CHORO, 5 TOLEDO, 5 IBRD / 88680 Emergency Response to Post Direct Selection Direct 158,314.72 0.00 Implementa 23 28 04 02 TURCO, 9 SABAYA, 4 COVID-19 tion HUACHACALLA, 2 CHIPAYA, 2 COIPASA Y 1 BELÉN DE ESMERALDA PARA FORTALECIMIENTO ORURO 2021 BM / AISEM / 073 / 2021 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 12 CHALLAPATA, 3 PAZÑA, 4 HUARI, 6 QUILLACAS, 3 SALINAS, 2 Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- PAMPA AULLAGAS, 8 IBRD / 88680 Emergency Response to Post Direct Selection Direct 180,850.58 0.00 Implementa 23 28 04 02 CARACOLLO, 2 COVID-19 tion EUCALIPTUS, 2 HUAYLLAMARCA, 2 CURAHUARA, 3 SORACACHI Y 3 TOTORAPARA FORTALECIMIENTO ORURO 2021 BM / AISEM / 074 / 2021 / 6to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 25 HUANUNI, 8 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 205,952.62 0.00 Implementa MACHACAMARCA, 12 23 28 04 02 COVID-19 tion POOPO Y 12 ANTEQUERA PARA FORTALECIMIENTO ORURO 2021 BM / AISEM / 075 / 2021 / 3er REQUERIMIENTO DE Strenthening Public Health Pending RECURSOS HUMANOS EN 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 247,360.93 0.00 Implementa SALUD: 69 SUCRE PARA 23 28 04 02 COVID-19 tion FORTALECIMIENTO CHUQUISACA 2021 BM / AISEM / 076 / 2021 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 5 ICLA, 7 MOJOCOYA, 5 PRESTO, 6 Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- TARABUCO, 8 YAMPARAÉZ, IBRD / 88680 Emergency Response to Post Direct Selection Direct 242,776.97 0.00 Implementa 23 28 04 02 4 ZUDAÑEZ, 3 ALCALA, 5 COVID-19 tion EL VILLAR, 9 PADILLA, 7 TOMINA, 9 VILLA SERRANO PARA FORTALECIMIENTO CHUQUISACA 2021 BM / AISEM / 077 / 2021 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 5 SOPACHUY, 5 Strenthening Public Health Pending TARVITA, 5 AZURDUY, 9 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 184,223.18 0.00 Implementa MONTEAGUDO, 8 VILLA 23 28 04 02 COVID-19 tion VACA GUZMÁN, 8 MACHARETÍ, 8 HUACARETA Y 5 HUACAYA PARA FORTALECIMIENTO CHUQUISACA 2021 BM / AISEM / 078 / 2021 / 6to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 9 CAMARGO, 1 Strenthening Public Health Pending VILLA ABECIA, 4 LAS 2021-02- 2021-02- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 163,440.52 0.00 Implementa CARRERAS, 8 CULPINA, 8 23 28 04 02 COVID-19 tion INCAHUASI, 8 VILLA CHARCAS Y 9 SAN LUCAS PARA FORTALECIMIENTO CHUQUISACA 2021 BM / AISEM / 079 / 2021 / 7mo REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- SALUD: 23 SUCRE, 7 IBRD / 88680 Emergency Response to Post Direct Selection Direct 129,734.26 0.00 Implementa 23 28 04 02 YOTALA Y 7 POROMA PARA COVID-19 tion FORTALECIMIENTO CHUQUISACA 2021 BM / AISEM / 080 / 2021 / 4to REQUERIMIENTO DE Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- RECURSOS HUMANOS EN IBRD / 88680 Emergency Response to Post Direct Selection Direct 285,693.15 0.00 Implementa 23 28 04 02 SALUD: 76 POTOSÍ Y 4 COVID-19 tion TUPIZA POTOSÍ 2021 BM / AISEM / 081 / 2021 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 15 BETANZOS, 9 Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- COLQUECHACA, 9 IBRD / 88680 Emergency Response to Post Direct Selection Direct 246,279.88 0.00 Implementa 23 28 04 02 CHAYANTA, 18 COVID-19 tion LLALLAGUA, 15 UNCÍA, 6 POCOATA PARA FORTALECIMIENTO POTOSÍ 2021 BM / AISEM / 082 / 2021 / 6to REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2021-02- 2021-02- 2021-03- 2021-06- SALUD: 51 POTOSÍ, 13 IBRD / 88680 Emergency Response to Post Direct Selection Direct 330,617.49 0.00 Implementa 23 28 04 02 TUPIZA, 15 UYUNI Y COVID-19 tion VILLAZÓN PARA FORTALECIMIENTO POTOSÍ 2021 BM / AISEM / 083 / 2021 / 3er REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 11 VILLA BUSCH, 9 PETROLERO, 9 COBIJA, 8 Strenthening Public Health Pending 2021-02- 2021-03- 2021-03- 2021-06- MAPAJO, (11) 27 DE MAYO, IBRD / 88680 Emergency Response to Post Direct Selection Direct 324,657.73 0.00 Implementa 24 01 05 03 8 SANTA CLARA, 12 COVID-19 tion PORVENIR, 10 FILADELFIA, 6 BOLPEBRA Y 12 BELLA FLOR PARA FORTALECIMIENTO PANDO 2021 BM / AISEM / 084 / 2021 / 4to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 6 SANTA ROSA, 13 PUERTO RICO, 11 SENA, 8 Strenthening Public Health Pending SAN LORENZO, 2 INGAVI, 2021-02- 2021-03- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 253,482.94 0.00 Implementa 10 GONZALO MORENO, 5 24 01 05 03 COVID-19 tion SAN PEDRO, 5 VILLANUEVA, 5 SANTOS MERCADO Y 7 NUEVA ESPERANZA PARA FORTALECIMIENTO PANDO 2021 Page 8 BM / AISEM / 085 / 2021 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 16 COMARAPA, 4 Strenthening Public Health Under 2021-03- 2020-06- 2021-03- 2021-03- 2021-06- SAIPINA, 19 PAILON Y 11 IBRD / 88680 Emergency Response to Post Direct Selection Direct 166,419.53 0.00 Implementa 01 30 06 10 08 HOSPITAL BERNARDINO GIL COVID-19 tion JULIO PARA FORTALECIMIENTO SANTA CRUZ 2021 BM / AISEM / 086 / 2021 / 6to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 6 CENTRO DE SALUD GERMAN VACA DIEZ, 8 CENTRO DE SALUD LOS Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- NEGROS, 17 HOSPITAL IBRD / 88680 Emergency Response to Post Direct Selection Direct 193,668.22 0.00 Implementa 01 06 10 08 FLORIDA, 17 CENTRO COVID-19 tion INTEGRAL DE MAIRANA Y 9 CENTRO DE SALUD QUIRUSILLAS PARA FORTALECIMIENTO SANTA CRUZ 2021 BM / AISEM / 087 / 2021 / 7mo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 12 SALA DE AISLAMIENTO VILLA OLÍMPICA, 11 CENTRO DE Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- SALUD GUARAYOS, 7 EX IBRD / 88680 Emergency Response to Post Direct Selection Direct 123,007.00 0.00 Implementa 01 06 10 08 CENTRO DE SALUD EL COVID-19 tion PUENTE, 3 EX CENTRO DE SALUD SAN JOSÉ Y 3 CENTRO DE SALUD YAGUARU PARA FORTALECIMIENTO SANTA CRUZ 2021 BM / AISEM / 088 / 2021 / 8vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 40 EQUIPOS DE RESPUESTA RÁPIDA RED OBISPO SANTIESTEBAN, 11 Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- C.S. HARDEMAN, 5 CENTRO IBRD / 88680 Emergency Response to Post Direct Selection Direct 373,620.26 0.00 Implementa 01 06 10 08 DE SALUD SAN PEDRO, 8 COVID-19 tion CENTROS DE SALUD INTEGRALES MUNICIPIO DE SAN PEDRO, 8 C.S. SAGRADO CORAZÓN, 14 C.S. VIRGEN DE FATIMA BM / AISEM / 089/ 2021 / 9no REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 15 HOSP. MAMERTO EGUEZ, 11 C.S.A. Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- VIRGEN DE FATIMA, 11 IBRD / 88680 Emergency Response to Post Direct Selection Direct 160,380.61 0.00 Implementa 01 06 10 08 C.S.I. FRAY DEL PILAR, 4 COVID-19 tion C.S.I. SAN LUIS, 4 C.S.I. SAN JUAN BAUTISTA 3 C.S.I. FRAY LEON DE BIGIGNNI PARA FORTALECIMIENTO SANTA CRUZ 2021 BM / AISEM / 090 / 2021 / 10mo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 7 C.S.I. GUTIERREZ, 26 HOSP. SEÑOR DE Strenthening Public Health Pending MALTA, 7 C.S. SANTIAGO 2021-03- 2021-03- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 207,563.27 0.00 Implementa DE MORO MORO, 7 C.S. 01 06 10 08 COVID-19 tion TRIGAL, 7 C.S. SAN JUAN DE DIOS DE PUCARA Y 7 C.S. SAN JUAN DE DIOS DE POSTRERVALLE PARA FORTALECIMIENTO SANTA CRUZ 2021 BM / AISEM / 091 / 2021 / 11vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 16 HOSP. EL TORNO, 70 EQUIPO DE Strenthening Public Health Pending RESPUESTA RÁPIDA RED 2021-03- 2021-03- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 547,944.75 0.00 Implementa ANDRES IBAÑEZ, 8 01 06 10 08 COVID-19 tion HOSPITAL NUESTRA SEÑORA DEL ROSARIO, 20 HOSP. IGNACIO WARNES, SATELITE NORTE, 1 CENTRO DE AISLAMIENTO SAN JORGE, 1 CENTRO DE AISLAMIE BM / AISEM / 093 / 2021 / 13vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 24 HOSPITAL MUNICIPAL PAMPA DE LA Strenthening Public Health Pending ISLA, 27 HOSPITAL 2021-03- 2021-03- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 464,880.17 0.00 Implementa MUNICIPAL BAJIO DEL 01 06 10 08 COVID-19 tion ORIENTE, 27 HOSPITAL EL TORNO Y 9 HOSPITAL MUNICIPAL JULIO MANUEL ARAMAYO PARA FORTALECIMIENTO SANTA CRUZ 2021 BM / AISEM / 094 / 2021 / 5to REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 12 HOSPITAL CLINICO VIEDMA, 12 Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- HOSPITAL DEL SUD, 13 IBRD / 88680 Emergency Response to Post Direct Selection Direct 240,470.55 0.00 Implementa 01 06 10 08 HOSPITAL DEL NORTE, 16 COVID-19 tion HOSPITAL SOLOMON KLEIN, 1 HOSPITAL AUGUSTO MORALES AZUA Y 2 CENTRO DE SALUD INTEGRAL VINTO COCHABAMBA 2021 BM / AISEM / 092 / 2021 / 12vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 23 C.S. YAPACANI, 10 HOSP. PARROQUIAL SAN RAMON, 26 HOSPITAL Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- MUNICIPAL CUATRO IBRD / 88680 Emergency Response to Post Direct Selection Direct 319,135.28 0.00 Implementa 01 06 10 08 CAÑADAS, 24 EQUIPO DE COVID-19 tion RESPUESTA RÁPIDA CUATRO CAÑADAS Y 14 HOSP. JULIO MANUEL ARAMAYO PARA FORTALECIMIENTO SANTA CRUZ 2021 BM / AISEM / 095 / 2021 / 14vo REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 7 CENETROP PARA 2021-03- 2021-03- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 28,420.41 0.00 Implementa LABORATORIO DE 02 07 11 09 COVID-19 tion REFERENCIA DEPARTAMENTAL DE ATENCIÓN COVID 19 SANTA CRUZ 2021 BM / AISEM / 096/2021 / 10mo REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending SALUD: 1 TERAPIA 2021-03- 2021-03- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 44,986.44 0.00 Implementa INTENSIVA, 8 08 13 17 15 COVID-19 tion HOSPITALIZACIÓN, 3 EMERGENCIAS Y 1 NUTRICIÓN PARA EL HOSPITAL DE LA MUJER LA PAZ 2021 BM / AISEM / 097/2021 / 11vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 9 EMERGENCIAS, 20 Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- HOSPITALIZAIÓN, 2 APOYO IBRD / 88680 Emergency Response to Post Direct Selection Direct 103,164.58 0.00 Implementa 08 13 17 15 Y DIAGNÓSTICO, 1 COVID-19 tion NUTRICIÓN Y 5 TERAPIA INTENSIVA PARA EL INSTITUTO NACIONAL DEL TÓRAX LA PAZ 2021 BM / AISEM / 099/2021 / 12vo REQUERIMIENTO DE RECURSOS HUMANOS EN Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- SALUD: 75 TERAPIA IBRD / 88680 Emergency Response to Post Direct Selection Direct 463,138.78 0.00 Implementa 10 15 19 17 INTENSIVA Y 44 COVID-19 tion EMERGENCIAS PARA EL HOSPITAL EL SUR DE EL ALTO - LA PAZ - 2021 BM / AISEM / 100/2021 / 13vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 56 Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- HOSPITALIZACIÓN, 13 IBRD / 88680 Emergency Response to Post Direct Selection Direct 301,451.46 0.00 Implementa 10 15 19 17 APOYO DIAGNÓSTICO Y 26 COVID-19 tion SERVICIOS DE APOYO PARA EL HOSPITAL EL SUR DE EL ALTO LA PAZ - 2021 BM / AISEM / 101/2021 / 14vo REQUERIMIENTO DE Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- RRHH EN SALUD: 35 IBRD / 88680 Emergency Response to Post Direct Selection Direct 162,340.38 0.00 Implementa 10 15 19 17 TERAPIA INTENSIVA PARA COVID-19 tion EL HOSPITAL DE CLÍNICAS LA PAZ - 2021 BM / AISEM / 102/2021 / 15vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 14 CSI VILLA NUEVO POTOSÍ, 15 CSI EL Strenthening Public Health Pending TEJAR, 14 CSI ASISTENCIA 2021-03- 2021-03- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 453,368.66 0.00 Implementa PÚBLICA / SAN JOSÉ DE 12 17 21 19 COVID-19 tion NATIVIDAD, 14 CSI PAMPAHAS BAJO, 14 CSI BELLA VISTA, 14 CSI CHASQUIPAMPA Y 50 BRIGADAS PARA 1er NIVEL MUNICIPIO LA PAZ BM / AISEM / 103/2021 / 16vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 25 CSI CHACALTAYA, 16 CS I Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- HUAYNAPOTOSI, 15 CSI IBRD / 88680 Emergency Response to Post Direct Selection Direct 427,774.20 0.00 Implementa 12 17 21 19 1RO DE MAYO, 7 CS COVID-19 tion CHARAPAQUI, 7 CS SAN FRANCISCO, 7 CS MERCEDARIO Y 50 BRIGADAS PARA 1er NIVEL MUNICIPIO EL ALTO LA PAZ 2021 BM / AISEM / 104/2021 / 17vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 24 HOSPITAL Strenthening Public Health Pending HOLANDES, 24 HOSPITAL 2021-03- 2021-03- 2021-03- 2021-06- IBRD / 88680 Emergency Response to Post Direct Selection Direct 260,079.01 0.00 Implementa COREA, 19 HOSPITAL LOS 12 17 21 19 COVID-19 tion ANDES Y 12 HOSPITAL BOLIVIANO JAPONES PARA 2do NIVEL MUNICIPIO EL ALTO LA PAZ 2021 BM / AISEM / 105/2021 / 18vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 18 HOSPITAL SAN BUENAVENTURA, 10 HOSPITAL ESCOMA, 9 Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- HOSPITAL ACHACACHI, 14 IBRD / 88680 Emergency Response to Post Direct Selection Direct 562,808.75 0.00 Implementa 12 17 21 19 HOSPITAL PUCARANI, 26 COVID-19 tion HOSPITAL VIACHA, 13 HOSPITAL COROICO, 10 HOSPITAL CARANAVI, 14 HOSPITAL CHULUMANI, 12 HOSPITAL IRUPANA, 10 BM / AISEM / 106/2021 / 19vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD (CONTINUIDAD): 45 TERAPIA INTENSIVA 25 Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- EMERGENCIAS, 39 IBRD / 88680 Emergency Response to Post Direct Selection Direct 318,058.02 0.00 Implementa 15 20 24 22 HOSPITALIZACIÓN Y 24 COVID-19 tion SERVICIOS DE APOYO PARA EL HOSPITAL DE 3er NIVEL EL NORTE DE EL ALTO - LA PAZ - 2021 BM / AISEM / 107/2021 / 7mo REQUERIMIENTO DE Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- RRHH EN SALUD COVID - IBRD / 88680 Emergency Response to Post Direct Selection Direct 6,558.00 0.00 Implementa 16 21 25 23 19: 3 LABORATORIO COVID-19 tion MUNICIPAL DE VILLAZÓN POTOSÍ - 2021 BM / AISEM / 108/2021 / 5to REQUERIMIENTO DE RRHH EN SALUD COVID - Strenthening Public Health Pending 2021-03- 2021-03- 2021-03- 2021-06- 19: 36 TERAPIA INTENSIVA IBRD / 88680 Emergency Response to Post Direct Selection Direct 241,842.00 0.00 Implementa 16 21 25 23 Y 16 HOSPITALIZACIÓN COVID-19 tion PARA EL HOSPITAL HERNAN MESSUTI RIVERA PANDO - 2021 Page 9 BM / AISEM / 109/2021 / 9no REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD: 46 RIBERALTA Y 20 Strenthening Public Health Pending 2021-03- 2021-04- 2021-04- 2021-07- GUAYARAMERÍN (18 IBRD / 88680 Emergency Response to Post Direct Selection Direct 252,777.99 0.00 Implementa 27 01 05 04 HOSPITAL GENERAL DE 2do COVID-19 tion NIVEL GUAYARAMERÍN Y 2 HOSPITAL MATERNO INFANTIL GUAYARAMERÍN) BENI 2021 BM / AISEM / 110/2021 / 15vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD COVID - 19 PARA EL HOSPITAL DE TERCER NIVEL DE MONTERO (53 TERAPIA Strenthening Public Health Pending 2021-04- 2021-04- 2021-04- 2021-07- INTENSIVA, 21 IBRD / 88680 Emergency Response to Post Direct Selection Direct 467,804.52 0.00 Implementa 05 10 14 13 HOSPITALIZACIÓN, 12 COVID-19 tion LABORATORIO, 6 IMAGENOLOGÍA, 8 FARMACIA, 6 ESTERILIZACIÓN, 7 SERVICIO DE TRANSFUSIÓN DE SANGRE) SANTA CR BM / AISEM / 120/2021 / 16vo REQUERIMIENTO DE RRHH COVID - 19: (3 HOSPITALIZACIÓN, 1 Strenthening Public Health Pending 2021-05- 2021-05- 2021-05- 2021-07- TERAPIA INTENSIVA, 1 IBRD / 88680 Emergency Response to Post Direct Selection Direct 14,072.30 0.00 Implementa 17 22 26 25 LABORATORIO, 2 APOYO COVID-19 tion DIAGNÓSTICO) PARA HOSPITAL DE MONTERO SANTA CRUZ TERCERA OLA 2021 BM / AISEM / 121/2021 / 17vo REQUERIMIENTO DE RRHH COVID - 19: (18 HOSPITALIZACIÓN, 13 Strenthening Public Health Pending 2021-05- 2021-05- 2021-05- 2021-08- EMERGENCIAS, 15 TERAPIA IBRD / 88680 Emergency Response to Post Direct Selection Direct 230,458.60 0.00 Implementa 17 22 26 24 INTENSIVA) HOSPITAL DE COVID-19 tion NIÑOS DR. MARIO ORTIZ SUAREZ - TERCERA OLA - SANTA CRUZ- 2021 BM / AISEM / 122/2021 / 18vOREQUERIMIENTO DE RRHH COVID - 19: (13 HOSPITALIZACIÓN Y 7 EMERGENCIAS) HOSPITAL Strenthening Public Health Pending DE LA MUJER DR. PERCY 2021-05- 2021-05- 2021-05- 2021-08- IBRD / 88680 Emergency Response to Post Direct Selection Direct 76,515.74 0.00 Implementa BOLAND Y (18 17 22 26 24 COVID-19 tion Hospitalización y 26 TERAPIA INTENSIVA) INSTITUTO ONCOLÓGICO DEL ORIENTE BOLIVIANO - DOMO - SANTA CRUZ TERCERA OLA 2021 BM / AISEM / 123/2021 / 19vo REQUERIMIENTO DE RRHH COVID - 19 PARA SANTA CRUZ (19 Strenthening Public Health Pending 2021-05- 2021-05- 2021-05- 2021-08- HOSPITALIZACIÓN, 12 IBRD / 88680 Emergency Response to Post Direct Selection Direct 440,424.00 0.00 Implementa 17 22 26 24 EMERGENCIAS, 61 TERAPIA COVID-19 tion INTENSIVA) HOSPITAL SAN JUAN DE DIOS -TERCERA OLA - 2021 BM / AISEM / 124/2021 / 20vo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending 2021-05- 2021-05- 2021-05- 2021-08- SANTA CRUZ (139 TERAPIA IBRD / 88680 Emergency Response to Post Direct Selection Direct 727,503.00 0.00 Implementa 17 22 26 24 INTENSIVA) HOSPITAL COVID-19 tion BOLIVIANO JAPONES - TERCERA OLA - 2021 BM / AISEM / 125/2021 / 16vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD COVID - 19 PARA Strenthening Public Health Pending 2021-05- 2021-05- 2021-05- 2021-08- PUERTO SUÁREZ (6 SALAS IBRD / 88680 Emergency Response to Post Direct Selection Direct 99,981.78 0.00 Implementa 19 24 28 26 DE AISLAMIENTO Y 16 COVID-19 tion BRIGADAS) Y PUERTO QUIJARRO (8 BRIGADAS) SANTA CRUZ - 2021 AISEM / BM / 126 /2021 / 10vo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending BENI (22 HOSPITALIZACIÓN, 2021-05- 2021-05- 2021-05- 2021-08- IBRD / 88680 Emergency Response to Post Direct Selection 81,640.00 0.00 Implementa 2 LABORATORIO) HOSPITAL 19 24 28 26 COVID-19 tion GENERAL DR. LUIS ALBERTO NAVARRO GUAYARAMERIN - TERCERA OLA - 2021 AISEM / BM / 127/2021 / 11vo REQUERIMIENTO DE RRHH COVID - 19 PARA BENI (6 EMERGENCIAS, 27 Strenthening Public Health Pending 2021-05- 2021-05- 2021-06- 2021-12- TERAPIA INTENSIVA, 43 IBRD / 88680 Emergency Response to Post Direct Selection Direct 268,881.78 0.00 Implementa 19 24 28 25 HOSPITALIZACIÓN, 3 COVID-19 tion APOYO DIAGNÓSTICO) HOSPITAL GENERAL RIBERALTA TERCERA OLA - 2021 AISEM / BM / 128/2021 / 12vo REQUERIMIENTO DE RRHH COVID - 19 PARA BENI (7 EMERGENCIAS, 35 TERAPIA INTENSIVA, 1 Strenthening Public Health Pending 2021-05- 2021-05- 2021-06- 2021-12- HOSPITALIZACIÓN, 1 IBRD / 88680 Emergency Response to Post Direct Selection Direct 192,902.62 0.00 Implementa 19 24 28 25 NUTRICIÓN 2 APOYO COVID-19 tion DIAGNÓSTICO) HOSPITAL GENERAL PRESIDENTE GERMAN BUSCH - TERCERA OLA - 2021 AISEM / BM / 129/2021 / 13vo REQUERIMIENTO DE RRHH COVID - 19 PARA BENI (6 EMERGENCIAS, 28 Strenthening Public Health Pending TERAPIA INTENSIVA, 33 2021-05- 2021-05- 2021-06- 2021-09- IBRD / 88680 Emergency Response to Post Direct Selection Direct 269,226.38 0.00 Implementa HOSPITALIZACIÓN, 2 19 24 28 26 COVID-19 tion SERVICIO DE APOYO) HOSPITAL MATERNO INFANTIL REIDUM ROINE - RIBERALTA - TERCERA OLA - 2021 AISEM / BM / 130/2021 / 14vo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending BENI (2 EMERGENCIAS, 22 2021-05- 2021-05- 2021-06- 2021-09- IBRD / 88680 Emergency Response to Post Direct Selection Direct 177,688.78 0.00 Implementa TERAPIA INTENSIVA, 19 19 24 28 26 COVID-19 tion HOSPITALIZACIÓN) HOSPITAL MATERNO INFANTIL TRINIDAD - TERCERA OLA - 2021 AISEM / BM / 131/2021 / 15vo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending BENI (41 HOSPITALIZACIÓN, 2021-05- 2021-05- 2021-06- 2021-09- IBRD / 88680 Emergency Response to Post Direct Selection Direct 139,181.20 0.00 Implementa 2 APOYO DIAGNÓSTICO, 1 19 24 28 26 COVID-19 tion NUTRICIÓN) HOSPITAL MUNICIPAL RURRENABAQUE - TERCERA OLA - 2021 BM / AISEM / 132 / 2021 / 16vo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending BENI (1 APOYO 2021-05- 2021-05- 2021-06- 2021-09- IBRD / 88680 Emergency Response to Post Direct Selection Direct 45,886.88 0.00 Implementa DIAGNÓSTICO, 11 19 24 28 26 COVID-19 tion HOSPITALIZACIÓN) CIRABO (2 DIAGNÓSTICO) CENTRO CENTINELA DE RIBERALTA - TERCER OLA - 2021 BM / AISEM / 133/2021 / SERVICIO DE IMPRESION DE GUIA DE MEDICINA TRADICIONAL PARA Strenthening Public Health Pending Request for Single Stage - One 2021-06- 2021-06- 2021-07- ABORDAJE DE LA COVIT- IBRD / 88680 Emergency Response to Post Open - National 7,930.00 0.00 Implementa Quotations Envelope 07 21 01 19, CARTILLADE COVID-19 tion PRODUCTOS NATURALES TRADICIONALES REGISTRADOS Y TRIPTICO DE PLANTAS MEDICINALES. BM / AISEM / 019/2021-1 / 1ER REQUERIMIENTO DE RRHH EN SALUD COVID - 19 TARIJA ESTABLECIMIENTOS DE Strenthening Public Health Pending SALUD DE TERCER NIVEL - 2021-06- 2021-06- 2021-06- 2021-09- IBRD / 88680 Emergency Response to Post Direct Selection Direct 146,965.00 0.00 Implementa 2021 PARA FORTALECER LA 10 14 14 01 COVID-19 tion RESPUESTA DEL SISTEMA SANITARIO DEL DEPARTAMENTO DE TARIJA ANTE LA EMERGENCIA DE SALUD PUBLICA POR EL COVID - 19 BM / AISEM / 020 / 2021- 1 / 1ER REQUERIMIENTO DE RRHH EN SALUD COVID - 19 TARIJA ESTABLECIMIENTOS DE Strenthening Public Health Pending 2021-06- 2021-06- 2021-06- 2021-09- SALUD SEGUNDO NIVEL - IBRD / 88680 Emergency Response to Post Direct Selection Direct 826,947.00 0.00 Implementa 10 14 24 22 2021 PARA FORTALECER LA COVID-19 tion RESPUESTA DEL SISTEMA SANITARIO DEL DEPARTAMENTO DE TARIJA ANTE LA EMERGENCIA DE SALUD PUBLICA POR EL COVID - 19 AISEM / BM / 134/2021 / 6to REQUERIMIENTO DE RRHH COVID - 19 PARA TARIJA (31 Strenthening Public Health Pending 2021-06- 2021-06- 2021-07- 2021-10- HOSPITALIZACIÓN, 11 IBRD / 88680 Emergency Response to Post Direct Selection Direct 415,691.37 0.00 Implementa 14 19 24 22 EMERGENCIAS, 11 APOYO COVID-19 tion DIAGNÓSTICO, 34 TERAPIA INTENSIVA) HOSPITAL REGIONAL SAN JUAN DE DIOS - TERCERA OLA - 2021 AISEM / BM / 135/2021 / 7mo REQUERIMIENTO DE RRHH COVID - 19 PARA TARIJA (13 Strenthening Public Health Pending 2021-06- 2021-06- 2021-07- 2021-10- HOSPITALIZACIÓN, 3 IBRD / 88680 Emergency Response to Post Direct Selection Direct 160,165.01 0.00 Implementa 14 19 24 22 EMERGENCIAS, 5 APOYO COVID-19 tion DIAGNÓSTICO, 13 TERAPIA INTENSIVA) HOSPITAL VIRGEN DE CHAGUAYA BERMEJO - TERCERA OLA - 2021 AISEM / BM / 136/2021 / 8vo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending 2021-06- 2021-06- 2021-07- 2021-10- TARIJA (15 IBRD / 88680 Emergency Response to Post Direct Selection Direct 65,861.37 0.00 Implementa 14 19 24 22 HOSPITALIZACIÓN, 1 COVID-19 tion APOYO DIAGNÓSTICO) HOSPITAL SAN ANTONIO - TERCERA OLA - 2021 BM / AISEM / 137/2021 / 9no REQUERIMIENTO DE RRHH COVID - 19 PARA TARIJA (38 Strenthening Public Health Pending 2021-06- 2021-06- 2021-07- 2021-10- HOSPITALIZACIÓN, 21 IBRD / 88680 Emergency Response to Post Direct Selection Direct 377,701.31 0.00 Implementa 14 19 24 22 EMERGENCIAS, 9 APOYO COVID-19 tion DIAGNÓSTICO, 22 TERAPIA INTENSIVA) HOSPITAL FRAY QUEBRACHO YACUIBA - TERCERA OLA - 2021 BM / AISEM / 138/2021 / 10mo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending TARIJA (15 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 96,617.49 0.00 Implementa HOSPITALIZACIÓN, 5 14 19 24 22 COVID-19 tion EMERGENCIAS, 4 APOYO DIAGNÓSTICO) HOSPITAL BÁSICO VILLAMONTES - TERCERA OLA - 2021 BM / AISEM / 139/2021 / 8vo REQUERIMIENTO DE RRHH COVID - 19 PARA CHUQUISACA (32 Strenthening Public Health Pending EMERGENCIAS, 2 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 148,698.54 0.00 Implementa HOSPITALIZACIÓN, 4 14 19 24 22 COVID-19 tion APOYO DIAGNOSTICO) ESTABLECIMIENTOS DE SALUD DE PRIMER NIVEL- TERCERA OLA - 2021 BM / AISEM / 140/2021 / 9no REQUERIMIENTO DE RRHH COVID - 19 PARA CHUQUISACA (80 Strenthening Public Health Pending HOSPITALIZACIÓN, 10 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 426,499.42 0.00 Implementa TERAPIA INTENSIVA, 19 14 19 24 22 COVID-19 tion APOYO DIAGNOSTICO) ESTABLECIMIENTOS DE SALUD DE SEGUNDO NIVEL- TERCERA OLA - 2021 Page 10 BM / AISEM / 141/2021 / 10mo REQUERIMIENTO DE RRHH COVID - 19 PARA CHUQUISACA (153 Strenthening Public Health Pending HOSPITALIZACIÓN, 17 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 674,326.09 0.00 Implementa TERAPIA INTENSIVA, 6 14 19 24 22 COVID-19 tion APOYO DIAGNOSTICO) ESTABLECIMIENTOS DE SALUD DE TERCER NIVEL- TERCERA OLA - 2021 BM / AISEM / 142/2021 / 20vo REQUERIMIENTO DE Strenthening Public Health Pending RRHH COVID - 19 PARA LA 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 53,910.79 0.00 Implementa PAZ (4 HEMOCENTRO, 13 14 19 24 22 COVID-19 tion INAMEN) TERCERA OLA - 2021 BM / AISEM / 143/2021 / 21vo REQUERIMIENTO DE RRHH COVID - 19 PARA LA PAZ (37 TERAPIA INTENSIVA) HOSPITAL DE Strenthening Public Health Pending LA PORTADA (34 TERAPIA 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 744,889.07 0.00 Implementa INTENSIVA) HOSPITAL DE 14 19 24 22 COVID-19 tion COTAHUMA (66 TERAPIA INTENSIVA, 19 HOSPITALIZACIÓN, 4 APOYO DIAGNÓSTICO) HOSP. DE CLÍNICAS UTI - B, (2 TERAPIA INTENSIVA) BM / AISEM / 144/2021 / 8vo REQUERIMIENTO DE RRHH COVID - 19 PARA POTOSI (46 TERAPIA Strenthening Public Health Pending INTENSIVA, 59 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 542,065.01 0.00 Implementa HOSPITALIZACIÓN, 8 14 19 24 22 COVID-19 tion APOYO DIAGNÓSTICO) CENTRO COVID SEVILLA - (19 HOSPITALIZACIÓN) CENTRO DE ATENCION PARY ORCKO -TERCERA OLA - 2021 BM / AISEM / 145/2021 / 9no REQUERIMIENTO DE Strenthening Public Health Pending RRHH COVID - 19 PARA 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 105,961.66 0.00 Implementa POTOSÍ (27 14 19 24 22 COVID-19 tion HOSPITALIZACIÓN, 1 APOYO) HOSPITAL MADRE OBRERA -TERCERA OLA - 2021 BM / AISEM / 146/2021 / 10mo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending POTOSÍ (16 CENTRO COVID 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 205,069.24 0.00 Implementa PUEBLOS ORIGINARIOS, 23 14 19 24 22 COVID-19 tion HOSPITAL EDUARDO EGUÍA, 25 HOSPITAL JOSE EDUARDO PEREZ)-TERCERA OLA - 2021 BM / AISEM / 147/2021 / 6to REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending 2021-06- 2021-06- 2021-07- 2021-10- PANDO (60 HOSP. MESSUTI, IBRD / 88680 Emergency Response to Post Direct Selection Direct 429,678.28 0.00 Implementa 14 19 24 22 38 HOSP. ROBERTO COVID-19 tion GALINDO, 17 HOSP. PERLA DEL ACRE) - TERCERA OLA - 2021 BM / AISEM / 148/2021 / 7mo REQUERIMIENTO DE RRHH COVID - 19 PARA TARIJA (133 Strenthening Public Health Pending HOSPITALIZACIÓN, 85 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 1,572,199.42 0.00 Implementa EMERGENCIAS, 7 APOYO 14 19 24 22 COVID-19 tion DIAGNÓSTICO, 190 TERAPIA INTENSIVA) HOSPITAL REGIONAL SAN JUAN DE DIOS - TERCERA OLA 2021 BM / AISEM / 149/2021 / 6to REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending COCHABAMBA (95 2021-06- 2021-06- 2021-07- 2021-10- IBRD / 88680 Emergency Response to Post Direct Selection Direct 1,604,050.00 0.00 Implementa HOSPITAL DEL NORTE, 83 15 20 25 23 COVID-19 tion HOSPITAL DEL SUD, 104 HOSPITAL SOLOMON KLEIN, 109 HOSPITAL VIEDMA) - TERCERA OLA - 2021 BM / AISEM/150/2021 / 26vo REQUERIMIENTO DE RECURSOS HUMANOS EN SALUD COVID - 19 PARA EL HOSPITAL EL NORTE DE EL Strenthening Public Health Pending 2021-06- 2021-06- 2021-08- 2021-11- ALTO - LA PAZ (45 TERAPIA IBRD / 88680 Emergency Response to Post Direct Selection Direct 822,053.79 0.00 Implementa 24 29 03 01 INTENSIVA, 55 COVID-19 tion EMERGENCIAS, 123 HOSPITALIZACIÓN, 5 FARMACIA, 5 NUTRICION Y 8 SERVICIOS DE APOYO) TERCERA OLA - 2021 BM/AISEM/151/2021 / 27vo REQUERIMIENTO DE RRHH COVID - 19 PARA Strenthening Public Health Pending 2021-06- 2021-06- 2021-08- 2021-11- HOSPITAL DE CLINICAS LA IBRD / 88680 Emergency Response to Post Direct Selection Direct 178,176.00 0.00 Implementa 24 29 03 01 PAZ (36 TERAPIA COVID-19 tion INTENSIVA, 3 PARA HOSPITALIZACION ) - TERCERA OLA - 2021 CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Process Expression of Request for Opening of Technical Evaluation of Description Component Review Type Method Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Status Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BM/AISEM/003 / Estudio Improving Quality of de Condiciones Previas Health Service Delivery and Quality And Cost- 2018-08- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- Ampliado Construccion y / Prior Open - National 190,000.00 0.00 Canceled Human Resource Capacity Based Selection 01 22 05 02 02 06 10 10 Equipamiento Hospitales de Development Segundo Nivel Region 3 BM/AISEM/001 / Estudio Improving Quality of de Condiciones Previas Health Service Delivery and Quality And Cost- Open - 2018-08- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- Ampliado Construccion y / Post 190,000.00 0.00 Canceled Human Resource Capacity Based Selection International 01 22 05 02 02 06 10 10 Equipamiento Hospitales de Development Segundo Nivel Region 1 BM/AISEM/002 / Estudio Improving Quality of de Condiciones Previas Health Service Delivery and Quality And Cost- Open - 2018-08- 2018-08- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- Ampliado Construccion y / Post 190,000.00 0.00 Canceled Human Resource Capacity Based Selection International 01 22 05 02 02 06 10 10 Equipamiento Hospitales de Development Segundo Nivel Region 2 BM/AISEM/010 / Supervision de la Strengthening Health Quality And Cost- Open - 2019-04- 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2019-09- 2023-07- Construccion y IBRD / 88680 Prior 3,000,000.00 0.00 Canceled Service Delivery Networks Based Selection International 08 29 27 24 15 19 23 31 equipamiento Hospital Universitario de 3er Nivel de la ciudad de La Paz BM/AISEM/013 / Supervision de la Strengthening Health Quality And Cost- 2019-10- 2019-11- 2019-12- 2019-12- 2020-01- 2020-02- 2020-03- 2023-07- IBRD / 88680 Prior Open - National 600,000.00 0.00 Canceled Construccion y Service Delivery Networks Based Selection 14 04 02 30 20 24 30 31 equipamiento Hospital de 2do Nivel de la Red Caranavi BM/AISEM/014 / Supervision de la Strengthening Health Quality And Cost- Open - 2019-10- 2019-11- 2019-12- 2019-12- 2020-01- 2020-02- 2020-03- 2023-07- IBRD / 88680 Prior 600,000.00 0.00 Canceled Construccion y Service Delivery Networks Based Selection International 14 04 02 30 20 24 30 30 equipamiento Hospital de 2do Nivel de la Red Quillacollo BM/AISEM/015 / Supervision de la Strengthening Health Quality And Cost- Open - 2019-10- 2019-11- 2019-12- 2019-12- 2020-01- 2020-02- 2020-03- 2023-07- IBRD / 88680 Prior 600,000.00 0.00 Canceled Construccion y Service Delivery Networks Based Selection International 14 04 02 30 20 24 30 31 equipamiento Hospital de 2do Nivel Uncia BM/AISEM/011 / Supervisión del Diseño, Construcción, Equipamiento y Puesta en Strengthening Health Quality And Cost- Open - 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-07- 2020-07- IBRD / 88680 Prior 1,200,000.00 0.00 Canceled Marcha de los Hospitales de Service Delivery Networks Based Selection International 24 14 27 27 26 31 05 04 2do Nivel de los Municipios San Ignacio de Velasco y Warnes del Departamento de Santa Cruz BM/AISEM/012 / Supervision de la Construccion y equipamiento Hospitales de Strengthening Health Quality And Cost- Open - 2019-04- 2019-05- 2019-06- 2019-07- 2019-07- 2019-09- 2019-10- 2023-03- IBRD / 88680 Prior 1,800,000.00 0.00 Canceled 2do Nivel del Municipio de Service Delivery Networks Based Selection International 22 13 10 08 29 02 07 20 la Guardia, Red Andres Ibanez - Municipio de San Julian, Red Nuflo de Chavez - Puerto Villarroel BM/AISEM/033/2020 / Supervisión de las Fases de Preinversión, Inversión y Puesta en Marcha para la complementación de Dos Strengthening Health Quality And Cost- Open - Under 2020-03- 2020-03- 2020-04- 2020-06- 2020-06- 2020-08- 2020-09- 2024-01- (2) Establecimientos de IBRD / 88680 Prior 1,200,000.00 0.00 Service Delivery Networks Based Selection International Implementation 04 25 22 08 29 03 07 08 Salud Hospitalarios de Segundo Nivel en los Municipios de San Ignacio de Velasco y San Julian del Departamento de Santa Cruz BM/AISEM/032/2020 / Supervisión de las Fases de Preinversión, Inversión y Puesta en Marcha para la Implementación de dos (2) Strengthening Health Quality And Cost- Open - Under 2020-03- 2020-03- 2020-04- 2020-06- 2020-06- 2020-07- 2020-09- 2024-01- IBRD / 88680 Prior 1,200,000.00 0.00 Establecimientos de Salud Service Delivery Networks Based Selection International Implementation 03 24 21 02 23 28 01 02 Hospitalarios de Segundo Nivel en los Municipios de La Guardia y Warnes del Departamento de Santa Cruz BM/AISEM/205/2020 / SUPERVISION DE LA CONSTRUCCION DEL BLOQUE DE CONTINGENCIA Y DISEÑO, SUPERVISION Y Strengthening Health Quality And Cost- 2020-12- 2020-12- 2021-01- 2021-02- 2021-02- 2021-03- 2021-03- 2021-07- IBRD / 88680 Post Open - National 58,387.79 0.00 Canceled PUESTA EN MARCHA DE LA Service Delivery Networks Based Selection 08 14 11 08 12 02 12 10 NUEVA UNIDAD DE EMERGENCIAS DEL HOSPITAL DE CLINICAS UNIVERSITARIO DE TERCER NIVEL BM/AISEM/204/2020 / AUDITORÍA EXTERNA AL PROYECTO “REDES DE SERVICIOS DE SALUD” BAJO EL CONTRATO DE PRÉSTAMO N° 8868 Y Least Cost 2020-12- 2020-12- 2021-01- 2021-02- 2021-02- 2021-03- 2021-04- 2021-06- CONVENIO DE IBRD / 88680 Project Management Post Open - National 50,000.00 0.00 Canceled Selection 08 11 08 05 15 01 10 09 FINANCIAMIENTO N° 6842 CON FINANCIAMIENTO DEL BANCO MUNDIAL COMPRENDIDO EN EL PERIODO 1 DE ABRIL DE 2019 AL 31 DE DICIEMBRE 2019 Y DEL 1º DE ENE BM/AISEM/067 / Auditoria Least Cost 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-03- 2020-04- 2020-06- IBRD / 88680 Project Management Post Open - National 20,000.00 0.00 Canceled Financiera Selection 04 25 23 20 03 09 13 12 BM/AISEM/046/2021 / SUPERVISION DE LA CONSTRUCCION DEL Consultant Strengthening Health Under 2021-02- 2021-03- 2021-02- 2021-03- 2021-04- 2021-09- EDIFICIO DE CONTINGENCIA IBRD / 88680 Post Qualification Limited 58,309.04 0.00 Service Delivery Networks Implementation 08 02 18 20 24 21 PARA LA UNIDAD DE Selection EMERGENCIAS DEL HOSPITAL DE CLINICAS UNIVERSITARIO DE LA PAZ BM / AISEM / 108 / 2021 / Servicio de auditoría financiera por el periodo comprendido entre el 21 de Least Cost Under 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- marzo al 31 de diciembre IBRD / 88680 Project Management Post Open - National 50,000.00 0.00 Selection Implementation 24 24 25 14 24 30 09 15 de 2019 y 1º de enero al 31 de diciembre de 2020 de los créditos 6248/BO y 8868-BO AISEM INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Process Draft Negotiated Description Component Review Type Method Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Status Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BM/AISEM/058 / Improving Quality of Individual Consultorias especializadas Health Service Delivery and 2019-01- 2019-02- 2019-03- 2019-04- 2019-10- / Post Consultant Open 60,000.00 0.00 Canceled para el hospital de tercer Human Resource Capacity 02 20 13 17 14 Selection nivel Development BM/AISEM/017 / Individual 2019-04- 2019-03- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 72,679.00 10,793.23 Signed 01 29 17 01 22 08 27 10 31 Comunicacion Social Selection Page 11 BM/AISEM/018 / Individual 2019-02- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- 2019-04- 2023-02- Profesional en Gestion IBRD / 88680 Project Management Post Consultant Open 91,629.00 41,254.52 Signed 26 08 14 10 19 11 23 18 28 Social Selection Individual BM/AISEM/019 / 2019-04- 2019-03- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2023-07- IBRD / 88680 Project Management Post Consultant Open 96,916.00 37,604.00 Signed Profesional Legal 01 29 17 26 22 30 27 20 31 Selection BM/AISEM/022 / Individual 2019-04- 2019-03- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2023-07- Profesional Financiero IBRD / 88680 Project Management Post Consultant Open 72,679.00 28,720.98 Signed 01 29 17 03 22 07 27 08 31 Contador Selection BM/AISEM/024 / Tecnico Individual Pending 2019-09- 2019-09- 2019-10- 2019-11- 2023-07- en Archivo y IBRD / 88680 Project Management Post Consultant Open 55,032.00 0.00 Implementation 12 28 03 07 31 Documentacion del Selection Proyecto Individual BM/AISEM/020 / Asistente 2019-02- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- 2019-04- 2023-07- IBRD / 88680 Project Management Post Consultant Open 41,322.00 6,084.58 Signed de Oficina - Secretaria 26 17 14 16 19 18 23 18 31 Selection Individual BM/AISEM/021 / 2019-02- 2019-03- 2019-03- 2019-05- 2019-03- 2019-05- 2019-04- 2019-05- 2023-07- IBRD / 88680 Project Management Post Consultant Open 104,326.00 15,709.33 Signed Profesional Financiero 26 10 14 09 19 17 23 20 31 Selection BM/AISEM/023 / Individual 2019-02- 2019-03- 2019-03- 2019-04- 2023-07- Profesional de IBRD / 88680 Project Management Post Consultant Open 104,326.00 0.00 Canceled 26 14 19 23 31 Adquisiciones Selection BM/AISEM/036 / Individual 2019-02- 2019-03- 2019-03- 2019-04- 2023-04- Profesional Medico IBRD / 88680 Project Management Post Consultant Open 95,153.00 0.00 Canceled 26 14 19 23 30 Salubrista Selection BM/AISEM/039 / Individual 2019-03- 2019-03- 2019-03- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2023-02- Profesional en IBRD / 88680 Project Management Post Consultant Open 95,011.00 39,928.94 Signed 11 22 27 03 01 06 06 10 28 Infraestructura Ingenieria Selection Electrica BM/AISEM/047 / Individual 2020-02- 2019-09- 2020-02- 2019-10- 2020-02- 2019-10- 2020-03- 2019-10- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 58,149.00 29,782.33 Signed 03 27 19 16 24 18 30 18 31 Infraestructura Selection BM/AISEM/050 / Individual 2020-02- 2020-02- 2020-02- 2020-03- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 58,149.00 0.00 Canceled 03 19 24 30 31 Equipamiento Medico Selection BM/AISEM/068 / Individual 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2023-07- Profesional de Sistemas IBRD / 88680 Project Management Post Consultant Direct 100,400.00 64,847.32 Signed 26 11 08 19 13 19 17 19 31 Informáticos y Tecnología Selection BM/AISEM/069 / Individual 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2023-07- Profesional en Monitoreo y IBRD / 88680 Project Management Post Consultant Direct 104,326.00 17,570.19 Signed 26 09 08 11 13 14 17 15 31 Evaluación Selection BM/AISEM/077 / Individual 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-06- 2019-04- 2023-07- Profesional de IBRD / 88680 Project Management Post Consultant Open 104,326.00 47,164.57 Signed 09 10 25 25 30 25 04 25 31 Adquisiciones Selection BM/AISEM/040 / Individual 2019-03- 2019-03- 2019-04- 2019-05- 2023-07- Profesional en Gestión IBRD / 88680 Project Management Post Consultant Open 96,916.00 0.00 Canceled 11 27 01 06 31 Ambiental Selection Individual BM/AISEM/040-2 / 2019-05- 2019-06- 2019-05- 2019-08- 2019-06- 2019-08- 2019-07- 2019-08- 2023-10- IBRD / 88680 Project Management Post Consultant Open 98,678.00 34,923.65 Signed Profesional ambiental 12 24 28 02 02 07 07 07 01 Selection BM/AISEM/041-2 / Individual PROFESIONAL EN 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2023-05- IBRD / 88680 Project Management Post Consultant Open 91,629.00 0.00 Canceled INFRAESTRUCTURA COSTOS 22 24 07 12 17 24 Selection Y PRESUPUESTOS BM/AISEM/049-1 / Individual 2019-05- 2019-06- 2019-06- 2019-08- 2019-06- 2019-08- 2019-07- 2019-08- 2023-01- PROFESIONAL EN IBRD / 88680 Project Management Post Consultant Open 87,560.00 36,073.18 Signed 22 24 07 12 12 12 17 12 14 EQUIPAMIENTO MEDICO Selection BM/AISEM/049 / Individual 2019-06- 2019-06- 2019-06- 2019-08- 2023-01- Profesional en IBRD / 88680 Project Management Post Consultant Open 87,560.00 0.00 Canceled 08 24 29 03 31 Equipamiento Medico Selection BM/AISEM/041 / Individual 2019-02- 2019-03- 2019-03- 2019-03- 2019-04- 2023-02- Profesional en IBRD / 88680 Project Management Post Consultant Open 91,629.00 0.00 Canceled 26 20 14 19 23 28 Infraestructura Costos y Selection Presupuestos BM/AISEM/037 / Individual 2019-02- 2019-03- 2019-03- 2019-04- 2023-07- Profesional en Gestion IBRD / 88680 Project Management Post Consultant Open 104,326.00 0.00 Canceled 26 14 19 23 31 Hospitalaria Selection BM/AISEM/038-1 / Individual PROFESIONAL EN 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2023-05- IBRD / 88680 Project Management Post Consultant Open 89,867.00 0.00 Canceled INFRAESTRUCTURA 21 24 06 11 16 10 Selection INGENIERO SANITARIO BM/AISEM/038 / Individual 2019-03- 2019-03- 2019-04- 2019-05- 2023-02- Profesional en IBRD / 88680 Project Management Post Consultant Open 89,867.00 0.00 Canceled 11 27 01 06 28 Infraestructura Ingeniero Selection Sanitario BM/AISEM/CI/120/2019 / Individual 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-08- 2019-08- 2019-08- 2023-09- Contratacion de Profesional IBRD / 88680 Project Management Post Consultant Open 95,153.00 8,665.48 Signed 01 12 17 01 22 01 26 16 02 Medico Salubrista Selection BM/AISEM/073/2019 / SUPERVISION DE LA CONSTRUCCION DEL BLOQUE DE CONTINGENCIA Y DISEÑO, SUPERVISION Y Strengthening Health Under 2019-09- 2019-10- 2019-12- 2020-06- IBRD / 88680 Prior Direct Selection Direct 846,210.00 0.00 PUESTA EN MARCHA DE LA Service Delivery Networks Implementation 30 05 09 06 NUEVA UNIDAD DE EMERGENCIAS DEL HOSPITAL DE CLINICAS UNIVERSITARIO DE TERCER NIVEL BM/AISEM/070 / Diseño, supervisión y puesta en Strengthening Health 2019-03- 2019-04- 2019-05- 2020-07- marcha de la Unidad de IBRD / 88680 Prior Direct Selection Direct 728,863.00 0.00 Canceled Service Delivery Networks 27 15 31 24 Emergencia del Hospital de Clínicas BM/AISEM/081/2019 / Individual PROFESIONAL EN 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2023-09- IBRD / 88680 Project Management Post Consultant Open 89,867.00 263,790.10 Signed INFRAESTRUCTURA 01 27 17 15 22 16 26 16 20 Selection INGENIERO SANITARIO BM/AISEM/079/2019 / Individual PROFESIONAL EN 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2023-09- IBRD / 88680 Project Management Post Consultant Open 91,629.00 50,947.63 Signed INFRAESTRUCTURA COSTOS 03 27 19 17 24 21 28 25 22 Selection Y PRESUPUESTOS BM/AISEM/080/2019 / Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-12- 2019-10- 2024-03- PROFESIONAL EN GESTION IBRD / 88680 Project Management Post Consultant Open 104,326.00 28,903.28 Signed 07 27 23 14 28 15 02 31 10 HOSPITALARIA Selection BM/AISEM/074/2019 / Individual PROFESIONAL INGENIERO 2019-10- 2019-10- 2019-10- 2019-11- 2019-12- 2020-06- IBRD / 88680 Project Management Post Consultant Direct 7,000.00 0.00 Canceled ELECTRICO I PARA EL 02 02 12 02 07 04 Selection PROYECTO REDES DE SALUD BM/AISEM/075/2019 / PROFESIONAL INGENIERO Individual 2019-10- 2019-11- 2019-10- 2019-10- 2019-11- 2019-12- 2020-06- ELECTRICO II PARA EL IBRD / 88680 Project Management Post Consultant Direct 7,000.00 0.00 Canceled 07 06 17 24 07 12 09 PROYECTO DE REDES DE Selection SALUD BM/AISEM/001/20 / Individual 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-04- 2020-01- 2020-10- 2020-12- PROFESIONAL EN IBRD / 88680 Project Management Post Consultant Open 53,594.00 17,065.60 Completed 25 27 12 16 04 16 08 16 05 31 COMUNICACION SOCIAL Selection BM/AISEM/002/20 / Individual 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2024-04- PROFESIONAL EN GESTION IBRD / 88680 Project Management Post Consultant Open 71,468.00 0.00 Canceled 25 27 10 15 19 24 SOCIAL Selection BM/AISEM/04/20 / Individual 2019-12- 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2024-04- ASISTENTE DE OFICINA - IBRD / 88680 Project Management Post Consultant Open 29,927.00 18,493.11 Signed 25 27 10 13 15 16 19 16 24 SECRETARIA Selection BM/AISEM/009/20 / Individual PROFESIONAL EN 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2023-12- IBRD / 88680 Project Management Post Consultant Open 75,562.00 0.00 Canceled INFRAESTRUCTURA 25 27 10 15 19 14 Selection INGENIERO SANITARIO BM/AISEM/010/20 / Individual PROFESIONAL EN 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2023-12- IBRD / 88680 Project Management Post Consultant Open 71,468.00 0.00 Canceled INFRAESTRUCTURA 25 27 10 15 19 14 Selection INGENIERIA ELECTRICA BM/AISEM/011/20 / Individual 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2023-12- PROFESIONAL EN GESTION IBRD / 88680 Project Management Post Consultant Open 71,468.00 0.00 Canceled 25 27 10 15 19 14 AMBIENTAL Selection BM/AISEM/012/20 / Individual PROFESIONAL EN 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2023-12- IBRD / 88680 Project Management Post Consultant Open 71,468.00 0.00 Canceled INFRAESTRUCTURA COSTOS 25 27 10 15 19 14 Selection Y PRESUPUESTOS BM/AISEM/014/20 / Individual PROFESIONAL EN 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2023-12- IBRD / 88680 Project Management Post Consultant Open 71,468.00 0.00 Canceled INFRAESTRUCTURA 25 27 10 15 19 14 Selection ARQUITECTO BM/AISEM/013/20 / Individual 2019-12- 2019-12- 2020-02- 2020-03- 2020-04- 2020-10- PROFESIONAL EN IBRD / 88680 Project Management Post Consultant Open 75,562.00 0.00 Canceled 25 27 12 04 08 05 EQUIPAMIENTO MEDICO Selection BM/AISEM/006/20 / Individual 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2024-04- PROFESIONAL EN IBRD / 88680 Project Management Post Consultant Open 75,562.00 0.00 Canceled 25 27 10 15 19 24 ADQUISICIONES Selection BM/AISEM/008/20 / Individual 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2024-05- PROFESIONAL EN GESTION IBRD / 88680 Project Management Post Consultant Open 75,562.00 0.00 Canceled 25 27 10 15 19 28 HOSPITALARIA Selection Individual BM/AISEM/03/20 / 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2024-04- IBRD / 88680 Project Management Post Consultant Open 71,468.00 0.00 Canceled PROFESIONAL LEGAL 25 27 10 15 19 24 Selection BM/AISEM/005/20 / Individual 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2024-04- PROFESIONAL FINANCIERO IBRD / 88680 Project Management Post Consultant Open 53,594.00 0.00 Canceled 25 27 10 15 19 24 - CONTADOR Selection BM/AISEM/015/20 / Individual PROFESIONAL EN SISTEMAS 2019-12- 2019-12- 2020-02- 2020-03- 2020-04- 2020-10- IBRD / 88680 Project Management Post Consultant Open 71,468.00 0.00 Canceled DE TECNOLOGIAS DE LA 25 27 12 04 08 05 Selection INFORMACION BM/AISEM/025/20 / COORDINADOR DEL Individual 2020-01- 2020-03- 2020-04- 2020-05- 2020-11- PROYECTO - CONTRATO DE IBRD / 88680 Project Management Post Consultant Open 112,695.00 0.00 Canceled 29 18 08 13 09 PRESTAMO N° 8868-BO Selection BANCO MUNDIAL BM/AISEM/016/20 / Individual 2019-12- 2019-12- 2020-02- 2020-03- 2020-04- 2020-10- PROFESIONAL EN IBRD / 88680 Project Management Post Consultant Open 75,562.00 0.00 Canceled 25 30 12 04 08 05 MONITOREO Y EVALUACION Selection BM/AISEM/026/2020 / Individual COORDINADOR DE 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-04- 2020-03- 2024-07- IBRD / 88680 Project Management Post Consultant Direct 112,695.00 22,059.67 Signed PROYECTO - CONTRATO DE 14 19 24 21 29 02 04 05 18 Selection PRESTAMO N° 8868-BO BANCO MUNDIAL BM/AISEM/028/2020 / SUPERVISION DE OBRAS DE MEJORAMIENTO DE Individual INFRAESTRUCTURA EN Pending 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- IBRD / 88680 Project Management Post Consultant Open 7,000.00 0.00 ESTABLECIMIENTOS DE Implementation 04 22 13 17 14 Selection SALUD DE PRIMER NIVEL MUNICIPIO LA PAZ (CENTROS DE SALUD EL ROSAL Y MALLASA) BM/AISEM/029/2020 / SUPERVISION DE OBRAS DE MEJORAMIENTO DE INFRAESTRUCTURA EN Individual Pending 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- ESTABLECIMIENTOS DE IBRD / 88680 Project Management Post Consultant Open 7,000.00 0.00 Implementation 10 28 19 23 20 SALUD DE PRIMER NIVEL Selection MUNICIPIO LA PAZ (CENTROS DE SALUD ACHACHICALA Y VILLA ARMONIA) Page 12 BM/AISEM/020-1 / Individual Strengthening Health 2019-07- 2019-03- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-07- 2020-03- Asistente de Oficina - IBRD / 88680 Post Consultant Direct 5,000.00 4,392.44 Signed Service Delivery Networks 05 09 15 10 05 12 09 15 07 Secretaria Selection BM/AISEM/034/2020 / Individual 2020-03- 2020-04- 2020-05- 2020-04- 2020-05- 2020-04- 2020-07- 2020-04- 2020-12- PROFESIONAL EN IBRD / 88680 Project Management Post Consultant Open 85,800.00 38,865.28 Signed 20 03 08 20 29 20 03 21 30 MONITOREO Y EVALUACION Selection Individual BM/AISEM/035/2020 / 2020-03- 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-05- 2020-06- 2024-07- 2020-12- IBRD / 88680 Project Management Post Consultant Open 80,800.00 17,803.05 Completed PROFESIONAL LEGAL 23 01 08 17 13 12 18 02 22 31 Selection BM/AISEM/037-1 / Individual 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2023-10- PROFESIONAL GESTION IBRD / 88680 Project Management Post Consultant Open 104,326.00 0.00 Canceled 22 24 07 12 17 24 HOSPITALARIA Selection Individual BM/AISEM/007/20 / 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2024-05- IBRD / 88680 Project Management Post Consultant Open 71,468.00 0.00 Canceled MEDICO SALUBRISTA 25 27 10 15 19 28 Selection BM/AISEM/078/2020 / Individual 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2021-01- Profesional Medico IBRD / 88680 Project Management Post Consultant Open 21,828.00 0.00 Under Review 26 03 10 11 14 01 Salubrista Selection BM/AISEM/077/2020 / Individual 2020-06- 2020-07- 2020-07- 2020-08- 2020-07- 2020-08- 2020-07- 2020-08- 2020-12- Profesional de IBRD / 88680 Project Management Post Consultant Open 23,562.00 5,782.89 Signed 30 03 15 26 17 26 20 27 31 Adquisiciones Selection BM/AISEM/079/2020 / Individual 2020-07- 2020-07- 2020-07- 2020-08- 2020-07- 2020-08- 2020-07- 2020-08- 2021-01- Consultor Tecnico en IBRD / 88680 Project Management Post Consultant Open 8,245.00 4,740.33 Signed 06 01 19 10 21 10 24 19 04 Adquisiciones I Selection BM/AISEM/080/2020 / Individual Under 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-12- Consultor Técnico en IBRD / 88680 Project Management Post Consultant Open 8,245.00 0.00 Implementation 06 06 14 16 19 30 Adquisiciones II Selection BM/AISEM/081/2020 / Individual Pending 2020-07- 2020-07- 2020-07- 2020-07- 2020-12- Consultor Tecnico en IBRD / 88680 Project Management Post Consultant Open 8,245.00 0.00 Implementation 06 14 16 19 30 Equipamiento Medico Selection Individual BM/AISEM/082/2020 / 2020-07- 2020-07- 2020-07- 2020-08- 2020-07- 2020-08- 2020-08- 2020-08- 2020-12- IBRD / 88680 Project Management Post Consultant Open 10,995.00 5,469.62 Signed Consultor Profesional Legal 06 06 15 05 17 20 10 25 31 Selection BM/AISEM/083/2020 / Individual 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-07- 2020-08- 2020-12- Consultor Tecnico IBRD / 88680 Project Management Post Consultant Open 8,245.00 1,185.08 Signed 07 01 19 15 21 13 24 14 31 Financiero I Selection BM/AISEM/084/2020 / Individual Under 2020-07- 2020-09- 2020-07- 2020-07- 2020-07- 2020-12- Consultor Técnico IBRD / 88680 Project Management Post Consultant Open 8,245.00 0.00 Implementation 07 25 14 17 20 31 Financiero II Selection BM/AISEM/120/2020 / Individual 2020-07- 2020-07- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-12- 2020-12- PROFESIONAL MÉDICO IBRD / 88680 Project Management Post Consultant Open 9,687.32 14,895.04 Completed 22 27 06 17 08 18 11 03 31 31 SALUBRISTA Selection BM/AISEM/133/2020 / Individual Pending 2020-07- 2020-09- 2020-10- 2020-11- 2021-05- Profesional de IBRD / 88680 Project Management Post Consultant Open 23,562.00 0.00 Implementation 30 17 08 12 11 Adquisiciones II Selection BM/AISEM/076/2020 / Individual 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2021-01- Profesional Financiero IBRD / 88680 Project Management Post Consultant Open 9,619.00 0.00 Canceled 26 03 10 11 16 02 Contador Selection BM/AISEM/153/2020 / Pending 2020-08- 2020-08- 2020-10- 2021-04- PROFESIONAL EN IBRD / 88680 Project Management Post Direct Selection Direct 8,718.59 0.00 Implementation 12 22 26 24 EQUIPAMIENTO MÉDICO II Individual BM/AISEM/075/2020 / 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2020-12- IBRD / 88680 Project Management Post Consultant Open 23,562.00 0.00 Canceled PROFESIONAL FINANCIERO 26 03 05 10 15 28 Selection BM/AISEM/187/2020 / Individual Under 2020-09- 2020-11- 2020-12- 2021-01- 2021-07- Consultor Técnico IBRD / 88680 Project Management Post Consultant Open 3,578.57 0.00 Implementation 25 13 04 08 07 Financiero III Selection BM/AISEM/186/2020 / Individual Under 2020-09- 2020-09- 2020-11- 2020-12- 2021-01- 2021-07- Consultor Técnico en IBRD / 88680 Project Management Post Consultant Open 3,578.57 0.00 Implementation 25 25 13 04 08 07 Adquisiciones III Selection Individual BM/AISEM/191/2020 / Under 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-12- IBRD / 88680 Project Management Post Consultant Open 4,844.75 0.00 PROFESIONAL FINANCIERO Implementation 09 12 18 26 30 31 Selection BM/AISEM/035 / Individual 2020-01- 2020-01- 2020-02- 2020-03- 2023-03- Profesional en IBRD / 88680 Project Management Post Consultant Open 70,484.00 0.00 Canceled 15 31 05 11 31 Infraestructura - Fiscal de Selection Proyecto BM/AISEM/045 / Individual 2019-06- 2019-06- 2019-07- 2019-08- 2023-01- Profesional en Proyectos de IBRD / 88680 Project Management Post Consultant Open 87,560.00 0.00 Canceled 10 26 01 05 31 Infraestructura Selection Individual BM/AISEM/017/20 / 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2024-04- IBRD / 88680 Project Management Post Consultant Open 75,561.00 0.00 Canceled PROFESIONAL FINANCIERO 25 27 10 15 19 24 Selection BM/AISEM/051 / Individual 2020-02- 2020-02- 2020-02- 2020-03- 2023-02- Profesional en Ingenieria IBRD / 88680 Project Management Post Consultant Open 95,011.00 0.00 Canceled 03 19 24 30 28 Biomedica Selection BM/AISEM/185/2020 / Individual 2020-09- 2020-11- 2020-12- 2021-01- 2021-07- PROFESIONAL FINANCIERO IBRD / 88680 Project Management Post Consultant Open 4,122.59 0.00 Canceled 25 13 04 08 07 CONTADOR Selection BM/AISEM/031 / Individual 2019-09- 2019-10- 2019-10- 2019-11- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 84,581.00 0.00 Canceled 16 02 07 11 31 Infraestructura - Fiscal de Selection Proyecto Individual BM/AISEM/056 / Asesor en 2020-02- 2020-03- 2020-04- 2020-05- 2022-12- IBRD / 88680 Project Management Post Consultant Open 43,732.00 0.00 Canceled Urologia 03 23 13 18 31 Selection Individual BM/AISEM/055 / Asesor en 2020-02- 2020-03- 2020-04- 2020-05- 2022-12- IBRD / 88680 Project Management Post Consultant Open 43,732.00 0.00 Canceled Medico Vascular 03 23 13 18 31 Selection BM/AISEM/057 / 5 Consultores Individuales Individual 2020-02- 2020-03- 2020-04- 2020-05- 2020-12- Expertos para Capacitacion IBRD / 88680 Project Management Post Consultant Open 35,000.00 0.00 Canceled 03 23 13 18 31 en Temas de Tecnologia Selection Especializada BM/AISEM/034 / Individual 2020-01- 2020-01- 2020-02- 2020-03- 2023-03- Profesional en IBRD / 88680 Project Management Post Consultant Open 70,484.00 0.00 Canceled 15 31 05 11 31 Infraestructura - Fiscal de Selection Proyecto BM/AISEM/048 / Individual 2020-02- 2020-02- 2020-02- 2020-03- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 58,149.00 0.00 Canceled 03 19 24 30 31 Infraestructura Selection Individual BM/AISEM/052 / Asesor en 2020-02- 2020-03- 2020-04- 2020-05- 2022-12- IBRD / 88680 Project Management Post Consultant Open 43,732.00 0.00 Canceled Nefrologia 03 23 13 18 31 Selection BM/AISEM/030 / Individual 2019-09- 2019-10- 2019-10- 2019-11- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 84,581.00 0.00 Canceled 16 02 07 11 31 Infraestructura - Fiscal de Selection Proyecto Individual BM/AISEM/054 / Asesor en 2020-02- 2020-03- 2020-04- 2020-05- 2022-12- IBRD / 88680 Project Management Post Consultant Open 43,732.00 0.00 Canceled Cardiologia 03 23 13 18 31 Selection BM/AISEM/032 / Individual 2019-09- 2019-10- 2019-10- 2019-11- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 84,581.00 0.00 Canceled 16 02 07 11 31 Infraestructura - Fiscal de Selection Proyecto BM/AISEM/149/2020 / Individual 2020-08- 2020-08- 2020-09- 2020-10- 2021-04- PROFESIONAL FINANCIERO IBRD / 88680 Project Management Post Consultant Limited 6,870.99 0.00 Canceled 07 12 02 07 05 CONTADOR Selection BM/AISEM/088/2020 / CONTRATACIÓN DE Individual 2020-07- 2020-07- 2020-07- 2020-08- 2020-12- COORDINADOR DE IBRD / 88680 Project Management Post Consultant Open 14,606.00 0.00 Canceled 01 28 31 04 31 PROYECTO DE REDES DE Selection SERVICIOS DE SALUD BM/AISEM/033 / Individual 2020-01- 2020-01- 2020-02- 2020-03- 2023-03- Profesional en IBRD / 88680 Project Management Post Consultant Open 70,484.00 0.00 Canceled 15 31 05 11 31 Infraestructura - Fiscal de Selection Proyecto BM/AISEM/046 / Individual 2019-06- 2019-06- 2019-07- 2019-08- 2023-01- Profesional en IBRD / 88680 Project Management Post Consultant Open 82,819.00 0.00 Canceled 10 26 01 05 31 Infraestructura para Selection remodelacion de obra BM/AISEM/027 / Individual 2019-08- 2019-08- 2019-09- 2019-10- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 84,581.00 0.00 Canceled 15 31 05 10 31 Infraestructura - Fiscal de Selection Proyecto Individual BM/AISEM/042 / 2019-06- 2019-06- 2019-06- 2019-07- 2023-02- IBRD / 88680 Project Management Post Consultant Open 79,295.00 0.00 Canceled Profesional en Estructuras 03 19 24 29 28 Selection BM/AISEM/026 / Individual 2019-07- 2019-07- 2019-08- 2019-09- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 95,011.00 0.00 Canceled 15 31 05 09 31 Infraestructura - Fiscal de Selection Proyecto BM/AISEM/043 / Individual 2019-06- 2019-06- 2019-06- 2019-07- 2023-07- Profesional en Gases IBRD / 88680 Project Management Post Consultant Open 96,874.00 0.00 Canceled 03 19 24 29 31 Medicinales Selection BM/AISEM/028 / Individual 2019-08- 2019-08- 2019-09- 2019-10- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 84,581.00 0.00 Canceled 15 31 05 10 31 Infraestructura - Fiscal de Selection Proyecto BM/AISEM/029 / Individual 2019-08- 2019-08- 2019-09- 2019-10- 2023-07- Profesional en IBRD / 88680 Project Management Post Consultant Open 84,581.00 0.00 Canceled 15 31 05 10 31 Infraestructura - Fiscal de Selection Proyecto BM/AISEM/044 / Individual 2019-06- 2019-06- 2019-06- 2019-07- 2023-07- Profesional en Ingenieria IBRD / 88680 Project Management Post Consultant Open 96,874.00 0.00 Canceled 03 19 24 29 31 Electromecanica - Selection Climatizacion Individual BM/AISEM/053 / Asesor en 2020-02- 2020-03- 2020-04- 2020-05- 2022-12- IBRD / 88680 Project Management Post Consultant Open 43,732.00 0.00 Canceled Neumologia 03 23 13 18 31 Selection BM/AISEM/206/2020 / Individual 2020-12- 2020-12- 2020-12- 2020-12- 2020-12- 2021-01- 2021-02- 2021-12- PROFESIONAL FINANCIERO IBRD / 88680 Project Management Post Consultant Direct 21,866.00 20,055.26 Signed 11 11 16 23 28 07 01 31 CONTADOR Selection BM/AISEM/001/2021 / Individual 2021-01- 2021-01- 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-01- 2021-12- PROFESIONAL EN IBRD / 88680 Project Management Post Consultant Open 23,249.56 22,007.30 Signed 07 07 26 13 28 18 10 18 31 ADQUISICIONES Selection Individual BM/AISEM/002/2021 / 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-12- IBRD / 88680 Project Management Post Consultant Open 21,990.09 0.00 Under Review PROFESIONAL LEGAL 07 07 25 27 10 31 Selection BM/AISEM/003/2021 / Individual Under 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-12- PROFESIONAL EN IBRD / 88680 Project Management Post Consultant Open 16,490.38 0.00 Implementation 07 07 25 27 09 31 COMUNICACIÓN SOCIAL Selection BM/AISEM/004/2021 / Individual Under 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-12- PROFESIONAL EN GESTIÓN IBRD / 88680 Project Management Post Consultant Open 23,249.56 0.00 Implementation 07 07 25 27 09 31 HOSPITALARIA Selection BM/AISEM/006/2023 / Individual 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-12- PROFESIONAL MÉDICO IBRD / 88680 Project Management Post Consultant Open 23,249.56 0.00 Under Review 07 07 25 27 10 31 SALUBRISTA Selection BM/AISEM/005/2022 / Individual 2021-01- 2021-01- 2021-01- 2021-05- 2021-01- 2021-05- 2021-02- 2021-05- 2021-12- PROFESIONAL EN GESTIÓN IBRD / 88680 Project Management Post Consultant Open 21,990.09 13,947.74 Signed 07 07 25 06 27 12 10 13 27 AMBIENTAL Selection Individual BM / AISEM / 098/2021 / Pending 2021-03- 2021-03- 2021-04- 2021-04- 2021-12- IBRD / 88680 Project Management Post Consultant Open 18,598.00 0.00 profesional financiero Implementation 11 30 01 14 31 Selection Page 13 BM / AISEM / 111 /2021 / Individual Under 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- 2021-09- TÉCNICO DE REGISTRO EN IBRD / 88680 Project Management Post Consultant Limited 5,964.29 0.00 Implementation 19 26 24 15 19 30 SISTEMA STEP I Selection BM / AISEM / 112 /2021 / Individual Under 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- 2021-09- TÉCNICO DE REGISTRO EN IBRD / 88680 Project Management Post Consultant Limited 5,964.29 0.00 Implementation 19 26 24 15 19 30 SISTEMA STEP II Selection BM / AISEM / 113/2021 / Individual Pending 2021-04- 2021-04- 2021-05- 2021-06- 2021-11- TÉCNICO DE REGISTRO EN IBRD / 88680 Project Management Post Consultant Limited 5,964.29 0.00 Implementation 20 25 16 20 17 SISTEMA STEP III Selection BM / AISEM / 114/2021 / PROFESIONAL ACTIVOS FIJOS PARA ACOMPAÑAMIENTO A Individual 2021-04- 2021-04- 2021-06- 2021-06- 2021-08- 2021-09- CODIFICACION E IBRD / 88680 Project Management Post Consultant Open 5,466.47 0.00 Under Review 20 20 08 29 03 17 IDENTIFICACION DE Selection EQUIPOS MEDICOS ADQUIRIDOS POR LA AISEM SEDE COCHABAMBA, TARIJA Y CHUQUISACA BM / AISEM / 115/2021 / PROFESIONAL ACTIVOS FIJOS PARA ACOMPAÑAMIENTO A Individual Under 2021-04- 2021-04- 2021-06- 2021-06- 2021-08- 2021-09- CODIFICACION E IBRD / 88680 Project Management Post Consultant Open 5,466.47 0.00 Implementation 20 20 08 29 03 17 IDENTIFICACION DE Selection EQUIPOS MEDICOS ADQUIRIDOS POR LA AISEM SEDE SANTA CRUZ, BENI Y PANDO BM / AISEM / 116/2021 / PROFESIONAL ACTIVOS FIJOS PARA ACOMPAÑAMIENTO A Individual 2021-04- 2021-04- 2021-06- 2021-06- 2021-08- 2021-09- CODIFICACION E IBRD / 88680 Project Management Post Consultant Open 5,102.04 0.00 Under Review 20 19 08 29 03 17 IDENTIFICACION DE Selection EQUIPOS MEDICOS ADQUIRIDOS POR LA AISEM SEDE LA PAZ, ORURO Y POTOSI BM / AISEM / 117/2021 / PROFESIONAL BIOMEDICO PARA ACOMPAÑAMIENTO A Individual CODIFICACION E Under 2021-04- 2021-04- 2021-06- 2021-06- 2021-08- 2021-09- IBRD / 88680 Project Management Post Consultant Open 5,102.04 0.00 IDENTIFICACION DE Implementation 20 20 08 29 03 17 Selection EQUIPOS MEDICOS ADQUIRIDOS POR LA AISEM SEDE LAPAZ, ORURO Y POTOSI BM / AISEM / 118/2021 / PROFESIONAL BIOMEDICO PARA ACOMPAÑAMIENTO A CODIFICACION E Individual Under 2021-04- 2021-04- 2021-06- 2021-06- 2021-08- 2021-09- IDENTIFICACION DE IBRD / 88680 Project Management Post Consultant Open 5,466.47 0.00 Implementation 20 20 08 29 03 17 EQUIPOS MEDICOS Selection ADQUIRIDOS POR LA AISEM SEDE COCHABAMBA, TARIJA Y CHUQUISACA BM / AISEM / 119/2021 / PROFESIONAL BIOMEDICO PARA ACOMPAÑAMIENTO A CODIFICACION E Individual Under 2021-04- 2021-04- 2021-06- 2021-06- 2021-08- 2021-09- IDENTIFICACION DE IBRD / 88680 Project Management Post Consultant Open 5,466.47 0.00 Implementation 20 20 08 29 03 17 EQUIPOS MEDICOS Selection ADQUIRIDOS POR LA AISEM SEDE SANTA CRUZ, BENI Y PANDO Page 14 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: December, 2016 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: Jan 2017 to June 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 5 High risk installation of plant and equipment and PPP) 2. (Goods; Information Technology & 1.5 High risk Non-Consulting Services) 3. Consultant Services (Firms) 0.5 High risk 4. Consultant Services (Individual 0.2 High risk Consultants) 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements: NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. January 11, 2018 9. Renewal or extension of individual consultant’s contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. January 11, 2018 PROCUREMENT Kenya : Kenya Climate Smart Agriculture Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2020-02-19 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154784 GPN Date: 2018-02-08 Project Name: Kenya Climate Smart Agriculture Project Loan / Credit No: IDA / 59450, IDA / V0320 K Executing Agency(ies): akamega County WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 1: Upscaling KE-KAKAMEGA COUNTY- Climate-Smart Agricultural Under 156886-CW-RFQ / Request for Single Stage - One 2020-06- IDA / 59450 Practices (US$163.8 million Post Limited 33,133.00 0.00 Implementat 2020-02-14 2019-04-05 2020-03-27 EXCAVATION OF INAYA Quotations Envelope 25 equivalent, of which IDA ion WATER PAN US$150.0 million eq uivalent) Component 1: Upscaling KE-KAKAMEGA COUNTY- Climate-Smart Agricultural Pending 167057-CW-RFB / Request for Single Stage - One 2020-09- IDA / 59450 Practices (US$163.8 million Post Limited 116,489.00 0.00 Implementat 2020-04-05 2020-05-31 CONSTRUCTION OF FISH Quotations Envelope 28 equivalent, of which IDA ion HOUSE WITH FISH HATCHERIES US$150.0 million eq uivalent) KE-KAKAMEGA COUNTY- Component 1: Upscaling 156872-CW-RFQ / Climate-Smart Agricultural Pending Request for Single Stage - One 2020-06- Constrcution of 2 Masonry IDA / 59450 Practices (US$163.8 million Post Limited 33,317.00 0.00 Implementat 2020-02-14 2020-03-20 Quotations Envelope 18 Water Tanks at Inaya equivalent, of which IDA ion village US$150.0 million eq uivalent) Component 1: Upscaling KE-KAKAMEGA COUNTY- Climate-Smart Agricultural Request for Pending 167048-CW-RFQ / Request for Single Stage - One 2020-08- IDA / 59450 Practices (US$163.8 million Post Limited Quotations (Non 33,133.00 0.00 Implementat 2020-04-14 2020-06-02 CONSTRUCTION OF PUMP AT Quotations Envelope 31 equivalent, of which IDA Bank-SPD) ion INAYA WATER PAN US$150.0 million eq uivalent) KE-KAKAMEGA COUNTY- Component 1: Upscaling 167047-CW-RFQ / Climate-Smart Agricultural Request for Pending Request for Single Stage - One 2020-08- Construction of Irrigation IDA / 59450 Practices (US$163.8 million Post Limited Quotations (Non 111,650.00 0.00 Implementat 2020-04-07 2020-05-26 Quotations Envelope 24 System will be constructed at equivalent, of which IDA Bank-SPD) ion InayaVillage US$150.0 million eq uivalent) Component 1: Upscaling Climate-Smart Agricultural Request for Pending CGK/KCSP/003/2018-2019 / Request for Single Stage - One 2021-07- IDA / 59450 Practices (US$163.8 million Post Limited Quotations (Non 33,133.00 0.00 Implementat 2021-06-01 2021-06-12 Exavation of Inaya Water Pan Quotations Envelope 12 equivalent, of which IDA Bank-SPD) ion US$150.0 million eq uivalent) KE-KAKAMEGA COUNTY- 196261-CW-RFQ / Idakho Component 1: Upscaling National Agritech for Climate-Smart Agricultural Procurement Pending Single Stage - One 2022-01- Commercialization of IDA / V0320 Practices (US$163.8 million Post Request for Bids Open - National Document - 1 117,892.70 0.00 Implementat 2021-06-10 2021-06-24 2021-07-01 2021-07-15 2021-07-29 Envelope 25 Horticulture (African Leafy equivalent, of which IDA Envelope process ion Vegetables) through use of US$150.0 million eq uivalent) (Non Bank-SPD) small irrigation KE-KAKAMEGA COUNTY- Component 1: Upscaling 236183-CW-RFQ / Climate-Smart Agricultural Request for Pending Request for Single Stage - One 2021-10- construction of the fish IDA / V0320 Practices (US$163.8 million Post Limited Quotations (Non 53,000.00 0.00 Implementat 2021-06-17 2021-07-15 Quotations Envelope 13 feeding house in shinyalu sub equivalent, of which IDA Bank-SPD) ion county. US$150.0 million eq uivalent) KE-KAKAMEGA COUNTY- Component 1: Upscaling National 238295-CW-RFB / Climate-Smart Agricultural Procurement Pending Single Stage - One 2022-01- CONSTRUCTION OF KHWISERO IDA / V0320 Practices (US$163.8 million Post Request for Bids Open - National Document - 1 132,414.70 0.00 Implementat 2021-06-10 2021-06-24 2021-07-01 2021-07-08 2021-07-22 Envelope 18 FISH HATCHERY IN KISA equivalent, of which IDA Envelope process ion CENTRAL US$150.0 million eq uivalent) (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Upscaling KE-KAKAMEGA COUNTY- Climate-Smart Agricultural Pending 232190-GO-RFQ / Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 37,555.64 0.00 Implementati 2021-06-18 2021-07-14 2021-08-13 PROCUREMENT OF Quotations Envelope equivalent, of which IDA on MOTORCYCLES US$150.0 million eq uivalent) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KAKAMEGA COUNTY- 223748-CS-LCS / Component 1: Upscaling environmental and Climate-Smart Agricultural Least Cost Pending hydrological social impact IDA / 59450 Practices (US$163.8 million Post Open - National 18,121.30 0.00 2021-06-07 2021-06-12 2021-06-26 2021-07-01 2021-07-15 2021-07-27 2021-08-08 2021-10-07 Selection Implementation survey report for IDAKHO equivalent, of which IDA North African leaf vegetable US$150.0 million eq uivalent) project Page 1 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN (Textual Part) Project information: COMESA: Great Lakes Trade Facilitation project P151083[country] [Project name] [P-number] Project Implementation agency: [insert legal name]COMESA Secretariat Date of the Procurement Plan: [insert date]14 June 2016 Period covered by this Procurement Plan: [insert from – to period]1 July 2016 – December 31, 2017 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in COMESA Procurement Implementation Rules of November 2005 (as amended by the Council and 2007)[insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. 1. Rule of origin of the goods: requires that all goods, works and services procured by the COMESA Secretariat shall originate in COMESA and requires tenderers to provide evidence of this through provisions of a certificate of origin duly made out by the competent authority of the supplier’s country of origin. Exceptions require written approval by the COMESA Secretary General. Under bank financed activities this will not apply 2. Participation in bidding: Open competition will be the default method of bidding. Restrictions whereby the Secretariat may deny bidders participation based on restriction for bidding to bidders being nationals of any non-Member States own or controlled bidders or to bidders who have substantial business activities in the territory of the Member State under whose laws it is constituted will not apply. Neither will restriction based on region. 3. Conditions for Use of Restricted Tendering: The restriction by COMESA under restricts tendering process whereby to only those bidders invited by the Secretariat will not apply under Bank financing; 4. Fraudulent practice: COMESA provisions on Fraud and Corruption will be modified to conform with the Banks definition of fraud and corruption which includes cross debarment 5. Tender Security: Tender security will not be restricted to the use of bid security from commercial banks and or bid bonds from insurance firms. At the option of the COMESA Secretariat, use may be made of Bid securing declaration in lieu of requests for provisions of bid security 6. Selection of consultants: Selection of consultant services based on methods and selection process as contained in the Banks Consultants Guidelines will apply in the selection of consultants services 7. Standard Bidding Documents: COMESA will use where possible the banks Standard Bidding documents in cases where COMESA does not have its own standard bidding documents. Where use is made of COMESA’s own Standard Bidding documents, the Bank will review and clear these to ensure they include minimum Banks policy for procurement and selection of consultants. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets: as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable”. Procurement of Second Hand Goods: as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable”. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. Contracts selected on basis of CQS, LCS and FBS may not exceed cost estimate of US$200,000 equivalent. 1. Terms of Reference (TOR): TOR for all consulting assignments (firms and individual consultants) irrespective of selection method or value will be subject to prior review by the Bank. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. In the case of this COMESA implemented project, the national consultants at the option of COMESA may be consultants from one member country or from the entire group of COMESA countries. PROCUREMENT Eastern Africa : AFR RI-Great Lakes Trade Facilitation PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-06-13 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151083 GPN Date: 2016-12-06 Project Name: AFR RI-Great Lakes Trade Facilitation Loan / Credit No: IDA / 57220 M Executing Agency(ies): inistry of Trade, Industry and Cooperatives WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned UG-MTIC-124434-NC-DIR / Component 1: Improving Pending Request for Single Stage - One 2019-11- Extension of electricity to the IDA / 57220 core trade infrastructure and Post Limited 2,000.00 0.00 Implementat 2019-08-13 2019-09-14 Quotations Envelope 28 temporally site facilities in the border areas ion UG-MTIC-124465-CW-RFQ / Component 1: Improving Pending Request for Single Stage - One 2019-11- Fencing, Drainage and IDA / 57220 core trade infrastructure and Post Limited 16,000.00 0.00 Implementat 2019-08-13 2019-09-10 Quotations Envelope 09 leveling to improve the facilities in the border areas ion temporally site UG-MTIC-148599-CW-RFP / Procurement of the of the Component 1: Improving Pending Request for Single Stage - Two 2020-12- contractor for the IDA / 57220 core trade infrastructure and Post Open - National 2,000,000.00 0.00 Implementat 2019-12-22 2019-12-31 2020-01-30 2020-04-08 2020-05-13 Proposals Envelope 25 construction of the Border facilities in the border areas ion Export Zone at Mpondwe GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MTIC-17066-GO-RFB / Software and equipment Component 3: Performance Pending Request for Single Stage - One Software and equipment for IDA / 57220 Based Management in Cross Post Open - National 145,000.00 0.00 Implementati 2018-06-01 2018-06-01 2018-06-01 2018-06-01 2018-06-22 2018-12-19 Quotations Envelope operationalising the IT Border Administration on Monitoring System Component 4: Pending UG-MTIC-17080-GO-RFB / Request for Single Stage - One IDA / 57220 Implementation support, Post Limited 20,400.00 0.00 Implementati 2017-08-07 2017-08-12 2017-09-23 2017-10-23 2017-11-27 2018-05-26 Supply of Office Furniture Quotations Envelope Communication and M&E on UG-MTIC-17082-GO-RFB / Supply of Office Equipment Component 4: Under Request for Single Stage - One and Supplies: Computers, IDA / 57220 Implementation support, Post Limited 28,200.00 0.00 Implementati 2017-08-07 2017-08-12 2017-09-23 2017-10-23 2017-11-27 2018-05-26 Quotations Envelope Printers, Copiers, Scanners, Communication and M&E on Camera, Projector Component 4: Pending UG-MTIC-17087-GO-RFB / Request for Single Stage - One IDA / 57220 Implementation support, Post Limited 20,500.00 0.00 Implementati 2017-07-17 2017-07-22 2017-09-02 2017-10-02 2017-11-06 2018-05-05 Supply of Stationery Quotations Envelope Communication and M&E on UG-MTIC-17072-GO-RFB / Component 4: Under Request for Single Stage - One Supply of two (2) Double IDA / 57220 Implementation support, Post Limited 70,950.00 0.00 Implementati 2017-09-05 2017-10-31 2018-04-29 Quotations Envelope Cabin Motor vehicles Communication and M&E on UG-MTIC-202919-GO-RFQ / Component 2: Supply of 4 tricycles to Implementation of Policy and Pending facilitate bulking and Procedural Reforms and Request for Single Stage - One IDA / 57220 Post Open - National 16,300.00 0.00 Implementati 2021-06-24 2021-11-01 2022-04-30 movement of goods a cross Capacity Building to Facilitate Quotations Envelope on the borders in response to Cross Border Trade in Goo ds COVID19 restrictions and Services NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MTIC-17219-NC-DIR / Component 4: Pending Service provider Office Request for Single Stage - One IDA / 57220 Implementation support, Post Limited 21,700.00 0.00 Implementati 2017-07-03 2017-07-08 2017-08-12 2018-02-08 communications: Internet Quotations Envelope Communication and M&E on Services UG-MTIC-17222-NC-DIR / Advertising for consultancy to undertake Environmental Component 1: Improving Pending Impact Assessment and IDA / 57220 core trade infrastructure and Post Direct Selection Direct 11,000.00 0.00 Implementati 2017-08-11 2017-08-16 2017-09-20 2018-03-19 documentation, Designs, Bills facilities in the border areas on of Quantities and Bid documents for A Border Market at Mpondwe UG-MTIC-17226-NC-DIR / Component 1: Improving Pending Advertising for contracting for IDA / 57220 core trade infrastructure and Post Direct Selection Direct 11,000.00 0.00 Implementati 2018-02-09 2018-02-14 2018-03-21 2018-09-17 the study on cargo flows at facilities in the border areas on Bunagana and Goli UG-MTIC-17228-NC-DIR / Component 4: Under Advertsing for recruitment of IDA / 57220 Implementation support, Post Direct Selection Direct 11,000.00 0.00 Implementati 2017-06-22 2017-06-29 2017-06-27 2017-08-14 2017-08-01 2018-01-28 Project Specialists Communication and M&E on UG-MTIC-17225-NC-DIR / Component 1: Improving Under Advertising for contracting for IDA / 57220 core trade infrastructure and Post Direct Selection Direct 2,800.00 0.00 Implementati 2018-04-16 2018-04-19 2018-04-21 2018-05-26 2018-11-22 construction of the Border facilities in the border areas on Market at Mpondwe Page 1 UG-MTIC-17227-NC-DIR / Advertising for the consultant to develop PBM systems Component 3: Performance Pending upgrade procedures and IDA / 57220 Based Management in Cross Post Direct Selection Direct 2,800.00 0.00 Implementati 2018-04-18 2018-04-23 2018-05-28 2018-11-24 manuals, train and assist Border Administration on agencies in operationalizing the manual Component 2: UG-MTIC-17220-NC-DIR / Implementation of Policy and Pending Service provider for Procedural Reforms and Request for Single Stage - One IDA / 57220 Post Limited 35,000.00 0.00 Implementati 2018-01-15 2018-03-12 2018-09-08 Installation of a toll free Capacity Building to Facilitate Quotations Envelope on telephone line. Cross Border Trade in Goo ds and Services UG-MTIC-17217-NC-RFQ / Procurement for communications: Telephone, Installation costs, Digital Component 4: Under Request for Single Stage - One handsets with an exchange IDA / 57220 Implementation support, Post Limited 6,500.00 0.00 Implementati 2017-08-20 2017-10-15 2018-04-13 Quotations Envelope system, mobile tabs to Communication and M&E on support coordination and field data collection and monthly Subscription UG-MTIC-80069-NC-RFQ / Installation of the "Happy or Component 3: Performance Pending not" devices at the three IDA / 57220 Based Management in Cross Post Direct Selection Direct 23,000.00 0.00 Implementati 2018-10-10 2018-10-22 2018-12-22 2020-12-31 borders-Goli, Mpondwe and Border Administration on Bunagana UG-MTIC-124453-NC-DIR / Component 1: Improving Pending Extension of water to the IDA / 57220 core trade infrastructure and Post Direct Selection Direct 2,000.00 0.00 Implementati 2019-08-08 2019-08-13 2019-09-16 2019-11-30 temporally site facilities in the border areas on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MTIC-17206-CS-QCBS / Consultancy Services to undertake functional review of the border agencies to assess Component 3: Performance Quality And Cost- the existing organizational IDA / 57220 Based Management in Cross Prior Open - National 135,000.00 0.00 Canceled 2017-09-11 2017-10-02 2017-11-15 2017-12-13 2018-01-12 2018-02-16 2018-03-23 2019-03-23 Based Selection functional and skills gaps , Border Administration recommend improvement including change management and performance rewards UG-MTIC-17208-CS-QCBS / Consultancy Services to Component 3: Performance develop PBM systems upgrade Quality And Cost- Pending IDA / 57220 Based Management in Cross Post Open - National 105,000.00 0.00 2018-03-12 2018-04-02 2018-05-16 2018-06-13 2018-07-13 2018-08-17 2018-09-21 2019-09-21 procedures and manuals, train Based Selection Implementation Border Administration and assist agencies in operationalizing the manuals UG-MTIC-17211-CS-QCBS / Component 4: Consultant Consultancy service to Pending IDA / 57220 Implementation support, Post Qualification Open - National 48,500.00 0.00 2017-09-04 2017-09-25 2017-11-08 2017-12-06 2018-01-05 2018-02-09 2018-03-16 2019-03-16 develop a Communication Implementation Communication and M&E Selection Strategy UG-MTIC-17201-CS-QCBS / Consultancy Services for Study Component 1: Improving Quality And Cost- Under on cargo flows and specific IDA / 57220 core trade infrastructure and Post Open - National 175,700.00 0.00 2018-01-05 2018-01-26 2017-11-14 2018-03-11 2018-04-08 2018-05-08 2018-06-12 2018-07-17 2019-07-17 Based Selection Implementation supply chains of 2 border facilities in the border areas markets Component 2: UG-MTIC-17205-CS-CDS / Implementation of Policy and Consultancy services to Procedural Reforms and Quality And Cost- Under develop a self-sustainability IDA / 57220 Post Open - National 136,000.00 0.00 2017-09-11 2017-10-06 2017-10-02 2017-11-14 2017-11-15 2017-12-12 2017-12-13 2018-01-12 2018-02-16 2018-03-23 2019-03-23 Capacity Building to Facilitate Based Selection Implementation and development Strategy for Cross Border Trade in Goo ds CBTAs and TIDOs and Services UG-MTIC-17200-CS-QCBS / Consultancy Services for Development of the Master Component 1: Improving Consultant Plan, Architectural designs Under IDA / 57220 core trade infrastructure and Post Qualification Open - National 155,700.00 0.00 2017-09-01 2017-09-22 2017-11-14 2017-11-05 2017-12-05 2018-01-09 2018-07-08 EIA, documentation, Designs, Implementation facilities in the border areas Selection Bills of Quantities and developing Bid documents for one border market UG-MTIC-51118-CS-CQS / Consultancy Services to undertake functional review of the border agencies to assess Component 3: Performance Consultant Under the existing organizational IDA / 57220 Based Management in Cross Prior Qualification Open - National 135,000.00 0.00 2018-03-07 2019-02-01 2018-03-28 2018-03-21 2018-05-11 2018-09-05 2018-06-10 2018-07-15 2019-01-11 Implementation functional and skills gaps , Border Administration Selection recommend improvement including change management and performance rewards UG-MTIC-67506-CS-CQS / Consultancy Services for Development of the Master Plan, Architectural designs Component 1: Improving Consultant Under EIA, documentation, Designs, IDA / 57220 core trade infrastructure and Post Qualification Open - National 102,000.00 0.00 2018-09-10 2019-03-07 2018-11-01 2018-12-15 2019-01-14 2019-02-18 2019-08-17 Implementation Bills of Quantities and facilities in the border areas Selection developing Bid documents for Kisoro/Bunagana border market UG-MTIC-67511-CS-QCBS / Consultancy Services for Study Component 1: Improving Consultant on cargo flows and specific Under IDA / 57220 core trade infrastructure and Post Qualification Open - National 84,000.00 0.00 2018-09-05 2019-03-07 2018-11-01 2018-12-15 2019-01-14 2019-02-18 2019-08-17 supply chains Implementation facilities in the border areas Selection Kisoro/Bunagana border markets Page 2 UG-MTIC-17207-CS-QCBS / Consultancy Services for Component 3: Performance Consultant Developing IT based IDA / 57220 Based Management in Cross Post Qualification Open - National 125,000.00 0.00 Canceled 2017-09-01 2021-04-01 2017-09-22 2017-11-05 2017-12-05 2018-01-09 2018-07-08 monitoring system to support Border Administration Selection performance based Management INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MTIC-17202-CS-QCBS / Component 2: Consultancy services to Implementation of Policy and Individual backstop the Ministry in Procedural Reforms and Under IDA / 57220 Post Consultant Limited 29,000.00 0.00 2017-07-03 2017-07-25 2017-07-13 2017-08-12 2017-09-16 2018-03-15 training Members on Capacity Building to Facilitate Implementation Selection functionality and effective Cross Border Trade in Goo ds operationalization of the JBCs and Services UG-MTIC-17204-CS-CDS / Expert to provide Consultant Services for Backstopping the Component 2: Ministry in training of officials Implementation of Policy and Individual on border management Procedural Reforms and Under IDA / 57220 Post Consultant Limited 23,000.00 0.00 2017-09-04 2017-09-14 2017-10-14 2017-11-18 2018-05-17 aspects relating to simplified Capacity Building to Facilitate Implementation Selection trade, best practices on Cross Border Trade in Goo ds treatment of small scale and Services traders and related national and regional trade regulations UG-MTIC-17214-CS-QCBS / Service provider for the Component 4: Individual development of an IT/phone Pending IDA / 57220 Implementation support, Post Consultant Limited 35,000.00 0.00 2017-08-18 2017-08-18 2017-08-18 2017-09-08 2018-03-07 based system to collect and Implementation Communication and M&E Selection transmit data from the borders to processing centers. Component 2: UG-MTIC-17215-CS-QCBS / Implementation of Policy and Individual Consultancy services to Procedural Reforms and Under IDA / 57220 Post Consultant Limited 35,000.00 0.00 2017-10-09 2017-10-06 2017-10-19 2017-11-18 2017-12-23 2018-06-21 develop simplified CBT Capacity Building to Facilitate Implementation Selection regulations Cross Border Trade in Goo ds and Services UG-MTIC-18034-CS-INDV / Component 4: Individual Under Recruitment officer of the IDA / 57220 Implementation support, Prior Consultant Open 105,000.00 0.00 2017-06-23 2017-08-07 2017-08-11 2017-08-18 2017-09-01 2017-10-06 2018-04-04 Implementation Social Development Specialist Communication and M&E Selection UG-MTIC-18040-CS-INDV / Component 4: Individual Under Recruitment of the IDA / 57220 Implementation support, Prior Consultant Open 105,000.00 0.00 2017-06-23 2017-08-07 2017-06-23 2017-08-18 2017-06-23 2017-07-14 2018-01-10 Implementation Environmental Specialist Communication and M&E Selection UG-MTIC-18036-CS-INDV / Component 4: Individual Under Recruitment of the Project IDA / 57220 Implementation support, Post Consultant Open 42,000.00 0.00 2017-08-15 2017-10-03 2018-04-16 2017-10-24 2018-04-18 2017-11-28 2018-05-27 Implementation Officer for MTIC Communication and M&E Selection UG-MTIC-18086-CS-INDV / Component 4: Individual Recruitment of the Office Under IDA / 57220 Implementation support, Post Consultant Open 32,800.00 0.00 2017-08-15 2017-08-15 2018-04-16 2017-08-15 2018-04-18 2017-09-05 2018-03-04 Administrator/Secretary for Implementation Communication and M&E Selection MTIC UG-MTIC-18081-CS-INDV / Component 4: Individual Under Recruitment of the Project IDA / 57220 Implementation support, Post Consultant Open 42,000.00 0.00 2017-07-31 2017-09-19 2018-04-16 2017-10-10 2018-04-18 2017-11-14 2018-05-13 Implementation Officer for MOWT Communication and M&E Selection UG-MTIC-80055-CS-INDV / Component 4: Individual Under Recruitment of the Monitoring IDA / 57220 Implementation support, Post Consultant Open 55,200.00 0.00 2018-10-05 2018-10-04 2018-11-05 2018-12-03 2018-12-21 2020-12-31 Implementation and Evaluation Specialist Communication and M&E Selection UG-MTIC-145079-CS-INDV / Component 4: Individual Recruitment of the Under IDA / 57220 Implementation support, Post Consultant Direct 35,420.00 0.00 2019-11-14 2019-11-19 2019-11-24 2019-11-30 2020-12-31 Mornitoring and Evaluation Implementation Communication and M&E Selection Specialist UG-MTIC-145094-CS-INDV / Component 4: Individual Under Recruitment of the IDA / 57220 Implementation support, Post Consultant Direct 35,420.00 0.00 2019-11-14 2019-11-19 2019-11-19 2019-11-24 2019-11-30 2020-12-31 Implementation Environmental Specialist Communication and M&E Selection UG-MTIC-185390-CS-INDV / Replacement of the Social Component 4: Individual Pending Development Specialist IDA / 57220 Implementation support, Post Consultant Direct 13,225.00 0.00 2020-07-24 2020-08-07 2020-08-10 2020-09-24 2020-12-31 Implementation following the demise of the Communication and M&E Selection office bearer in March 2019 UG-MTIC-202737-CS-INDV / Component 4: Individual Recruitment of two clerks of Pending IDA / 57220 Implementation support, Post Consultant Limited 19,200.00 0.00 2020-11-03 2020-11-13 2020-11-25 2020-11-30 2021-11-30 works at Mpondwe and Implementation Communication and M&E Selection Bunagana. Page 3 Procurement Plan for Punjab RWSS (P150520) I. General 1. Bank’s approval Date of the procurement Plan 2012 2. Date of General Procurement Notice: [October 01, 2014 ] 3. Period covered by this procurement plan: January 2020 onwards II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as per the Procurement Risk Rating of the Project: 2. Procurement Method Prior Review Threshold US$ 1. ICB and LIB (Goods) Above US$ 2M 2. NCB (Goods) Above US$ 1M 3. ICB (Works) Above US$ 40 million 4. NCB (Works) Above US$ 10 million 5. (Non-Consultant Services) Above US$ 1M 2. Prequalification for Bidders _Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P150520 5. Any Other Special Procurement Arrangements: In addition, the justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold 1. Competitive Methods (Firms) Above US$ 1M 2. Single Source (Firms) Above US$ 500,000 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT India : Punjab Rural Water and Sanitation Sector Improvement Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2018-07-25 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150520 GPN Date: Project Name: Punjab Rural Water and Sanitation Sector Improvement Project Loan / Credit No: IBRD / 84870 Division Moga Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PRWSS-W-DIV41-3994- 1/RRS / W/S Scheme Village Dhalle Ke, Block Moga-2, District Moga: Providing, Laying, fixing & jointing PVC Inclusive Household Water Request for Single Stage - One 2018-07- Pipes 90 mm o/d, House IBRD / 84870 Post Open - National 20,300.00 16,187.59 Completed 2018-07-18 2018-07-18 2016-10-31 and Sanitation Services Quotations Envelope 18 Connections, Repair of existing Pump Chamber development of water works and all other works under component 2B PRWSS-W-DIV41-3993- 1/RRS / W/S Scheme Kot Mohommad Khan, Block Dharmkot Distt Moga: Providing, Laying, fixing & jointing of PVC Pipes 90 mm Inclusive Household Water Request for Single Stage - One 2018-07- IBRD / 84870 Post Open - National 14,150.00 12,670.33 Completed 2018-07-18 2018-07-18 2016-11-05 o/d, Providing House and Sanitation Services Quotations Envelope 18 Connections, Repair of existing Pump Chamber, development of water works and all other works under comp. 2B PRWSS-W-DIV41-3984- 1/CRS / W/S Scheme Village Talwandi Nau Bahar, Block Dharmkot Distt. Moga: Providing, Laying, fixing & Inclusive Household Water Request for Single Stage - One 2018-07- jointing of uPVC Pipes, IBRD / 84870 Post Open - National 11,600.00 10,329.42 Completed 2018-07-18 2018-07-18 2016-09-15 and Sanitation Services Quotations Envelope 18 Providing House Connections, comm one electronically op diaphram metering system chlorinator and all other works under Component 2A PRWSS-W-DIV41-4881- 1/RRS / WSS Vill. Mauje Wala, bl. Dharmkot Distt Mog:Provision of PVC Pipes 90 mm o/d, Installation of 1 No. Electronically actuated, Inclusive Household Water Request for Single Stage - One 2018-08- IBRD / 84870 Post Open - National 11,100.00 11,757.49 Completed 2018-08-22 2018-08-22 2016-12-05 Diaphragm Operated, and Sanitation Services Quotations Envelope 22 Metering System, Chemical Dosing Chlorinator, Prov House Connections, Repair of existing PC and OHSR Complete DWSS-W-DIV41-5662-1 / WSS Village Tatarie Wal Block Moga-1 Dist. Moga: Prov installing, testing & comm electronic actuated Inclusive Household Water Request for Single Stage - One 2019-08- chlorinator, const. of Tin IBRD / 84870 Post Open - National 33,200.00 23,461.52 Signed 2018-12-22 2019-02-16 2019-02-18 and Sanitation Services Quotations Envelope 15 Shed,Repair of Ex OHSR,Dev of Water works,Dist system and House conn complete in all respect under component 2a(i). DWSS-W-DIV41-5861- 1/MOGASWS-1 / WSS village Daudhar Sharki Block Moga-1 Inclusive Household Water Request for Single Stage - One 2019-08- District Moga: Providing and IBRD / 84870 Post Open - National 23,200.00 21,305.79 Signed 2018-12-29 2019-02-23 2019-04-16 and Sanitation Services Quotations Envelope 22 laying of pipelines and installing water connections and minor repair of structures PRWSS-S-DIV41-6214-1 / Renovation of rooms for new JE Sections (S279 to S290) under Jusrisdiction of Division Strengthening Institutions Request for Single Stage - One 2020-04- EE-1, Moga including White IBRD / 84870 Post Open - National 3,000.00 0.00 Canceled 2019-07-20 2019-10-29 and Project Management Quotations Envelope 26 washing repair of room fixing electric fans & Lights e.t.c under component 4A of PRWSSIP PRWSS-W-DIV41-6560-1 / WSS Village Kishanpura Said, Block Dharamkot, District Moga: Prov and installing deep tubewell, construction of Transformation - Improved Request for Single Stage - One 2020-09- IBRD / 84870 Post Open - National 60,300.00 55,931.13 Signed 2019-08-06 2019-11-15 2019-12-11 OHSR, construction of pump Livability of Villages Quotations Envelope 10 chamber, development of water works site, laying of pipeline, providing house connections, etc. PRWSS-W-DIV41-6561-1 / WSS Village Lalhaundi, Block Dharamkot, district Moga: Prov and installing deep tubewell, construction of Transformation - Improved Request for Single Stage - One 2020-09- OHSR, construction of pump IBRD / 84870 Post Open - National 63,000.00 52,160.09 Signed 2019-08-06 2019-11-15 2020-02-25 Livability of Villages Quotations Envelope 10 chamber, development of water works site, laying of pipeline, providing house connections, etc complete in all respect. Page 1 PRWSS-S-DIV41-6578-1 / Construction of Building for Single Stage - Two 2020-06- Water Supply Testing Centre IBRD / 84870 Improved Water Quality Post Request for Bids Open - National 108,000.00 91,556.56 Signed 2019-07-15 2019-05-24 2019-07-20 2019-08-31 2019-10-15 2019-11-13 2019-10-23 2019-12-18 2019-12-11 Envelope 15 cum Sample Collection Centre for district Moga PRWSS-W-DIV41-6848-1 / WSS Sherpur Taiban, block Dharam Kot, Moga : Providing Inclusive Household Water Request for Single Stage - One 2020-03- improved access to water IBRD / 84870 Post Open - National 14,300.00 13,570.57 Signed 2019-10-07 2020-01-21 2019-12-02 and Sanitation Services Quotations Envelope 21 through household connections under component 2A(i) of PRWSSIP. DWSS-W-DIV41-6866-1 / WSS Chugawan, block Moga- 1, Moga: Providing improved Inclusive Household Water Request for Single Stage - One 2020-03- IBRD / 84870 Post Open - National 12,000.00 10,097.38 Signed 2019-10-07 2020-01-21 2020-01-06 access to water through and Sanitation Services Quotations Envelope 21 house hold connections under component 2A(i) of PRWSSIP. DWSS-W-DIV41-6849-1 / WSS Jhandiana Sharki, block & District , Moga : Providing Inclusive Household Water Request for Single Stage - One 2020-03- improved access to water IBRD / 84870 Post Open - National 12,000.00 10,593.61 Signed 2019-10-07 2020-01-21 2019-12-06 and Sanitation Services Quotations Envelope 21 through household connections under component 2A(i) of PRWSSIP. DWSS-W-DIV41-7098-1 / WSS Nawan Moga, block dharamkot, Moga : Providing Inclusive Household Water Request for Single Stage - One 2020-04- improved access to water IBRD / 84870 Post Open - National 11,500.00 10,568.53 Signed 2019-10-07 2020-02-10 2019-12-06 and Sanitation Services Quotations Envelope 10 through house hold connections under component 2A(i) of PRWSSIP. DWSS-W-DIV41-6980-1 / WSS Village Ramu Wala Nawan, block Moga-1, Moga : Inclusive Household Water Request for Single Stage - One 2020-05- IBRD / 84870 Post Open - National 14,200.00 12,866.62 Signed 2019-11-18 2020-03-23 2019-12-16 Providing improved access to and Sanitation Services Quotations Envelope 22 water through household connections DWSS-W-DIV41-6978-1 / WSS Village Mehron, block Moga-1, Moga Providing Inclusive Household Water Request for Single Stage - One 2020-05- IBRD / 84870 Post Open - National 14,000.00 11,908.88 Signed 2019-11-18 2020-03-23 2019-12-16 improved access to water and Sanitation Services Quotations Envelope 22 through house hold connections DWSS-W-DIV41-6976-1 / WSS Mange Wala, block Moga- Inclusive Household Water Request for Single Stage - One 2020-05- 2, Moga : Providing improved IBRD / 84870 Post Open - National 20,000.00 17,132.95 Signed 2019-11-18 2020-03-23 2020-01-16 and Sanitation Services Quotations Envelope 22 access to water through house hold connections in existing DWSS-W-DIV41-7867-1 / WSS Village Chotian Kalan, block Moga-2, Moga Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 15,000.00 0.00 Canceled 2020-02-24 2020-06-29 Providing improved access to and Sanitation Services Quotations Envelope 28 water through house hold connections DWSS-W-DIV41-8027-1 / WSS Khosa Pando, block Moga- Inclusive Household Water Request for Single Stage - One 2020-10- 2, Moga : Providing improved IBRD / 84870 Post Open - National 16,000.00 13,556.40 Signed 2020-04-20 2020-08-24 2020-07-16 and Sanitation Services Quotations Envelope 23 access to water through house hold connections in existing DWSS-W-DIV41-8030-1 / WSS Gill, block Moga-2, Moga Inclusive Household Water Request for Single Stage - One 2020-10- : Providing improved access to IBRD / 84870 Post Open - National 17,000.00 0.00 Canceled 2020-04-20 2020-08-24 and Sanitation Services Quotations Envelope 23 water through house hold connections in existing DWSS-W-DIV41-8103-1 / WSS village Jhande Wala Block Moga-1, District Moga: Inclusive Household Water Request for Single Stage - One 2020-11- Providing improved access to IBRD / 84870 Post Open - National 17,500.00 15,331.83 Signed 2020-06-14 2020-09-28 2020-11-20 and Sanitation Services Quotations Envelope 27 water through house hold connections in existing Scheme. DWSS-W-DIV41-8104-1 / WSS village Madho Ke Block Moga-1, District Moga: Inclusive Household Water Request for Single Stage - One 2020-11- Providing improved access to IBRD / 84870 Post Open - National 19,200.00 0.00 Canceled 2020-06-14 2020-09-28 and Sanitation Services Quotations Envelope 27 water through house hold connections in existing Scheme. DWSS-W-DIV41-8132-1 / WSS village Indergarh Block Dharamkot, District Moga: Inclusive Household Water Request for Single Stage - One 2020-11- Providing improved access to IBRD / 84870 Post Open - National 14,200.00 12,108.36 Signed 2020-06-14 2020-09-28 2020-07-16 and Sanitation Services Quotations Envelope 27 water through house hold connections in existing Scheme. DWSS-W-DIV41-8030- 1/2/RBD / REBIDDING WSS Village Gill, block Moga-2, Inclusive Household Water Request for Single Stage - One 2021-05- Moga : Providing improved IBRD / 84870 Post Open - National 16,820.00 14,925.00 Signed 2020-10-18 2021-03-27 2020-10-20 and Sanitation Services Quotations Envelope 26 access to water through house hold connections in existing Water Supply Scheme DWSS-W-DIV41-8104- 1/2/RBD / REBIDDING WSS village Madho Ke Block Moga- 1, District Moga: Providing Inclusive Household Water Request for Single Stage - One 2021-05- IBRD / 84870 Post Open - National 19,200.00 17,315.39 Signed 2020-10-18 2021-03-27 2020-10-27 improved access to water and Sanitation Services Quotations Envelope 26 through house hold connections in existing Scheme. Page 2 DWSS-W-DIV41-8255-1 / WSS village Jhandiana Garbi, block Moga-2 Dicstrict Moga: Inclusive Household Water Request for Single Stage - One 2021-05- Providing improved access to IBRD / 84870 Post Open - National 25,730.00 22,704.71 Signed 2020-10-18 2021-03-27 2020-11-20 and Sanitation Services Quotations Envelope 26 water through house hold connections in existing Water Supply Schemes. DWSS-W-DIV41-8234-1 / WSS Village Khukhrana, block Moga-2, Moga: Providing Inclusive Household Water Request for Single Stage - One 2021-05- improved access to water IBRD / 84870 Post Open - National 13,560.00 11,331.57 Signed 2020-10-18 2021-03-27 2020-11-05 and Sanitation Services Quotations Envelope 26 through house hold connections in existing Water Supply Scheme. PRWSS-W-DIV41-8258-1 / WSS Village Fatehpur Jhugian, SC Basti Fatehpur Jhugian & Transformation - Improved Request for Single Stage - One 2021-05- Maste Wala, Block Dharamkot, IBRD / 84870 Post Open - National 47,780.00 43,433.50 Signed 2020-10-18 2021-03-27 2020-12-08 Livability of Villages Quotations Envelope 26 Distt. Moga: Tubewell, OHSR, Pipeline, Water Connection, Solar Panel, Water Metes. DWSS-W-DIV41-8427-1 / WSS Village Joge Wala, Block Transformation - Improved Request for Single Stage - One 2021-05- Moga-2, Distt. Moga: under IBRD / 84870 Post Open - National 46,690.00 41,638.64 Signed 2020-10-18 2021-03-27 2020-12-08 Livability of Villages Quotations Envelope 26 PRWSSIP Sub Component 1a(ii)" DWSS-W-DIV41-8931-1 / WSS Kokri Kalan, block Moga- Inclusive Household Water Request for Single Stage - One 2022-01- 2, Moga: Providing improved IBRD / 84870 Post Open - National 60,000.00 0.00 Canceled 2021-10-19 and Sanitation Services Quotations Envelope 17 access to water through house hold connections DWSS-W-DIV41-8788-1 / WSS Vill Ajitwal, Blk Moga-1: Providing and Installing Centralized Sodium Request for Single Stage - One 2021-12- IBRD / 84870 Improved Water Quality Post Open - National 12,000.00 0.00 Canceled 2021-09-14 Hypochlorite Storage facility Quotations Envelope 13 including FPR tank of capacity of 10,000 litres at WSS Ajitwal, District Moga DWSS-W-DIV41-8788-1/CRS / WSS Village Ajitwal, District Moga: Providing and Installing Request for Single Stage - One 2021-05- Centralized Sodium IBRD / 84870 Improved Water Quality Post Open - National 12,000.00 11,249.56 Signed 2021-01-14 2021-03-04 2021-02-10 Quotations Envelope 03 Hypochlorite Storage facility including FPR tank of capacity of 10,000 litres . DWSS-W-DIV41-8931-1/CRS / WSS Kokri Kalan, block Moga- 1, Moga : Providing improved Inclusive Household Water Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National 60,000.00 92.24 Signed 2021-01-21 2021-03-11 2021-03-10 access to water through and Sanitation Services Quotations Envelope 07 house hold connections in existing WSS DWSS-W-DIV41-7867-1/CRS / WSS Chotian Kalan, block Moga-2, Moga : Providing Inclusive Household Water Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National 15,000.00 0.00 Canceled 2021-01-21 2021-03-11 improved access to water and Sanitation Services Quotations Envelope 07 through house hold connections in existing WSS DWSS-W-DIV41-9139-1 / National WSS Village Amin Wala, block Procurement Under Dharamkot, Moga : Providing Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 1 24,000.00 0.00 Implementat 2021-04-27 2021-06-14 improved access to water and Sanitation Services Quotations Envelope 13 Envelope process ion through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9177-1 / National WSS Village Kapure, block Procurement Under Moga-1, Moga : Providing Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 1 23,200.00 0.00 Implementat 2021-04-27 2021-06-14 improved access to water and Sanitation Services Quotations Envelope 13 Envelope process ion through house hold (Non Bank-SPD) connections DWSS-W-DIV41-9135-1 / National WSS Baghele Wala, block Moga- Procurement Under 2, Moga : Providing improved Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 1 27,000.00 0.00 Implementat 2021-04-27 2021-06-14 access to water through and Sanitation Services Quotations Envelope 13 Envelope process ion house hold connections in (Non Bank-SPD) existing Water Supply Schemes. DWSS-W-DIV41-7867- National 1/CRS2 / WSS Chotian Kalan, Procurement block Moga-2, Moga : Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 1 20,000.00 17,059.91 Signed 2021-04-27 2021-06-14 2021-06-01 Providing improved access to and Sanitation Services Quotations Envelope 13 Envelope process water through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9178-1 / National WSS Village Said Jalalpur, Procurement Under block Dharamkot, Moga : Transformation - Improved Request for Single Stage - One 2021-12- IBRD / 84870 Post Open - National Document - 2 57,000.00 0.00 Implementat 2021-05-31 2021-06-30 Providing improved access to Livability of Villages Quotations Envelope 27 Envelope process ion water through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9484-1 / National WSS Village Baje ke, block Procurement Under Dharamkot, Moga : Providing Inclusive Household Water Request for Single Stage - One 2021-12- IBRD / 84870 Post Open - National Document - 2 13,000.00 0.00 Implementat 2021-05-31 2021-06-30 improved access to water and Sanitation Services Quotations Envelope 27 Envelope process ion through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9488-1 / National WSS Village Dosanjh, block Procurement Under Moga-1, Moga : Providing Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 2 13,000.00 0.00 Implementat 2021-05-31 2021-06-30 improved access to water and Sanitation Services Quotations Envelope 29 Envelope process ion through house hold (Non Bank-SPD) connections in existing WSS Page 3 DWSS-W-DIV41-9489-1 / National DWSS Village Daulatpura Procurement Under Ucha, block Moga-2, Moga Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 2 15,000.00 0.00 Implementat 2021-05-31 2021-06-30 Providing improved access to and Sanitation Services Quotations Envelope 29 Envelope process ion water through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9490-1 / National WSS Village Sadda Singh Wala, Procurement Under block Moga-2, Moga Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 2 39,000.00 0.00 Implementat 2021-05-31 2021-06-30 Providing improved access to and Sanitation Services Quotations Envelope 29 Envelope process ion water through house hold (Non Bank-SPD) connections in existing WSS PRWSS-W-DIV41-9492-1 / National WSS Village Jaimal Wala, block Procurement Under Moga-2, Moga : Providing Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 2 26,000.00 0.00 Implementat 2021-05-31 2021-06-30 improved access to water and Sanitation Services Quotations Envelope 29 Envelope process ion through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9491-1 / National WSS Village Kalie Wala, block Procurement Under Moga-2, Moga Providing Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 2 24,000.00 0.00 Implementat 2021-05-31 2021-06-30 improved access to water and Sanitation Services Quotations Envelope 29 Envelope process ion through house hold (Non Bank-SPD) connections in existing WSS PRWSS-W-DIV41-9493-1 / National WSS Village Rauli, block Moga- Procurement Under 1, Moga: Providing improved Inclusive Household Water Request for Single Stage - One 2021-08- IBRD / 84870 Post Open - National Document - 2 30,000.00 0.00 Implementat 2021-05-31 2021-06-30 access to water through and Sanitation Services Quotations Envelope 29 Envelope process ion house hold connections in (Non Bank-SPD) existing WSS PRWSS-W-DIV41-9108-1 / National WSS village Bijapur and Gatti Procurement Under Inclusive Household Water Request for Single Stage - One 2021-08- Kamal Ke, block Dharamkot, IBRD / 84870 Post Open - National Document - 2 98,000.00 0.00 Implementat 2021-05-31 2021-06-30 and Sanitation Services Quotations Envelope 29 Moga : Augmentation of multi- Envelope process ion village WSS (Non Bank-SPD) DWSS-W-DIV41-9685-1 / WSS Village Dhurkot charat National singh Wala, block Moga-1, Procurement Pending Inclusive Household Water Request for Single Stage - One 2021-09- Division No-1 Moga : IBRD / 84870 Post Open - National Document - 2 14,000.00 0.00 Implementat 2021-06-21 2021-07-26 and Sanitation Services Quotations Envelope 24 Providing improved access to Envelope process ion water through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9688-1 / National WSS Village Puranewala, block Procurement Pending Moga-1, Division No-1 Moga : Inclusive Household Water Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National Document - 2 14,500.00 0.00 Implementat 2021-06-21 2021-07-26 Providing improved access to and Sanitation Services Quotations Envelope 24 Envelope process ion water through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9687-1 / WSS Village Kokri Phula National singh, block Moga-1, Division Procurement Pending Inclusive Household Water Request for Single Stage - One 2021-09- No-1 Moga : Providing IBRD / 84870 Post Open - National Document - 2 27,000.00 0.00 Implementat 2021-06-21 2021-07-26 and Sanitation Services Quotations Envelope 24 improved access to water Envelope process ion through house hold (Non Bank-SPD) connections in existing WSS DWSS-W-DIV41-9689-1 / National WSS Village Bahona, block Procurement Pending Moga-1, Division No-1 Moga : Inclusive Household Water Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National Document - 2 24,000.00 0.00 Implementat 2021-06-21 2021-07-26 Providing improved access to and Sanitation Services Quotations Envelope 24 Envelope process ion water through house hold (Non Bank-SPD) connections in existing WSS GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PRWSS-G-DIV41-6212-1 / Procurement of office Furniture, Electric Fans and other facilities for New JE Strengthening Institutions Request for Single Stage - One IBRD / 84870 Post Open - National 6,000.00 0.00 Canceled 2019-07-20 2019-10-29 2020-04-26 sections (S279 to S290) under and Project Management Quotations Envelope jurisdiction of Division EE-1, Moga under Component 4A of PRWSSIP NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 4 Armenia Social Investment and Local Development Project (P148836) Procurement Plan I. General 1. Date of General Procurement Notice: December 2, 2014 2. Period covered by this procurement plan: from January 2015 to December, 2019 The TOR of consulting assignments (individual and firm) and technical specifications of packages are subject of prior agreement with the TTL. All cancellation of selection process and/or re-invitation shall be subject to Bank’s prior review. All the contracts whose cost estimation was below the Bank’s prior review threshold are subject to prior review if the financial offer of the selected firm exceeds such threshold at the proposals evaluation stage. . Irrespective of the thresholds the selection of all consultants (firm and individuals) hired for legal work or for procurement activities as well as the individual hired for long-term technical assistance or advisory services for duration of the Project (or most of it) are subject to prior review. In case of a slice and package arrangement, the prior review threshold is determined based on the aggregate value of individual contracts to be awarded under such arrangement. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. NCB (Goods) packages > US$ 200,000 and All the contracts (< USD 100,000 and < USD first 2 contracts subject to 500,000) irrespective of retroactive estimation financing 2. NCB (Works) packages > US$ 500,000 and (< USD 200,000 and < USD first 2 contracts 4,000,000) irrespective of estimation 3. Shopping (Goods) packages All the contracts (≤USD 100,000 ) subject to First 2 contracts retroactive financing 4. Shopping (Minor Works) packages First 3 contracts (≤ USD 200,000 ) 5. Direct contracting (Goods and All the contracts Works) All the contracts subject to irrespective of retroactive estimation financing 2. Prequalification. No prequalification is envisaged. 3. Proposed Procedures for Community participation in Procurement (as per paragraph. 3.19 of the Guidelines: implementation procedures of procurement of Goods, Works and Non- Consulting services and selection of Consulting services to be followed by the communities are described in detail in the POM. 4. Reference to (if any) Project Operational/Procurement Manual: Operational Manual for Social Investment and Local Development Project to be approved by the Bank. 5. Any Other Special Procurement Arrangements: Some furniture for schools and kindergartens totaling USD 70000 (Shopping) equivalent may be procured in accordance with the provisions of paragraph 1.11 of the procurement Guidelines 6. Procurement Packages with Methods and Time Schedule On the later stage the details (description of packages, schedule, methods etc.) should be provided. 1 2 3 4 5 6 7 Estimate Revie d Domesti Envisage w Cost Numbe Ref c d start of by US$ r of . Description Prefere procurem Bank Million packag No. nce ent (Prior (tax es (yes/no) process / inclusive Post) amount) Summary of the NCB Prior / (Goods) 1.8 12 NO Jul.2015 Post packages Summary of the NCB Prior / (Works) 27.46 115 NO May.2015 Post packages Summary of the Shopping Prior / (Goods) 0.76 9 NO Feb.2015 Post packages Summary of the Shopping Prior / (Minor Works) 5.4 30 NO May.15 Post packages Total 35.42 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments >US$ 100,000 and first 2 contracts under each 1. Competitive Methods (Firms) method of selection All the irrespective of estimation contracts All the contracts 2. Single Source subject to irrespective of estimation retroactive > US$ 50,000 and first 2 3. Individual financing contracts All the contracts 4. Sole source selection irrespective of estimation 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Consultants’ Services, including Training, up to an aggregate amount not exceed $400,000 equivalent may be procured in accordance with the provisions of paragraph 1.14 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule On the later stage the details (description of packages, schedule, methods etc.) should be provided. 1 2 3 4 5 6 Envisage Re Estimat Selecti d start f. Description of ed Review on of No Assignment Cost by Bank Metho procure . US$ (Prior / Post) d ment million process May.2015 Technical Supervision of Construction (9 contracts) 0.65 CQ (3 Prior / Post contracts) Architectural Design and Jan.2015 Author Supervision (21 1.6 CQ (4 Prior / Post contracts) contracts) Jan.2015 Expertise of Architectural Design (5 contracts) 0.08 CQ (1 Prior / Post contract) Expertise of Buildings and Jan.2015 Constructions (6 0.1 CQ (1 Prior / Post contracts) contract) Local Government Jul.2015 Financial Training (3 0.27 CQ (1 Prior / Post contracts) contract) Apr.2016 Beneficiary and Impact Assessment (2 contracts) 0.09 CQ (1 Prior / Post contract) Quality of civil works assessment 0.02 CQ Sep.2016 Prior / Post Study Tours, Staff Trainings and Seminars 0.12 SOE Jul.2015 Activities to support the transition from ASIF to 0.3 TDF Total Consultant and Training Services 3.23 PROCUREMENT Armenia : Armenia Social Investment and Local Development Project PLAN General Information Country: Armenia Bank’s Approval Date of the Original Procurement Plan: 2017-12-07 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P148836 GPN Date: Project Name: Armenia Social Investment and Local Development Project Loan / Credit No: IBRD / 84830, IBRD / 90600 Armenian Territorial Development Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned TAT-01 / Reinforcement, Support to Socio-Economic overhaul of ambulatory in the Request for IBRD / 84830 Development and Capacity Prior Open - International 0.00 78,366.58 Signed 2015-09-29 village of Norashen, Marz of Quotations Building at the Local Level Ararat TSQ-01 / Reconstruction of Support to Socio-Economic House-museum after Sero Request for IBRD / 84830 Development and Capacity Prior Open - International 0.00 145,640.22 Signed 2015-10-06 Khanzadyan in Goris, Marz of Quotations Building at the Local Level Syuniq TSH-01 / Construction of a Support to Socio-Economic school for 100 pupils in the Single Stage - One IBRD / 84830 Development and Capacity Prior Request for Bids Open - National 0.00 386,367.08 Signed 2015-11-10 2015-11-30 village of Vardaqar, Marz of Envelope Building at the Local Level Shirak TVZ-01 / Reinforcement, Support to Socio-Economic reconstruction of the Single Stage - One IBRD / 84830 Development and Capacity Prior Request for Bids Open - National 0.00 294,656.01 Signed 2015-11-23 2015-12-24 kindergarten in the village of Envelope Building at the Local Level Zaritap, Marz of Vayots Dzor TTV-02 / Reconstruction of Support to Socio-Economic the third building of N2 Request for IBRD / 84830 Development and Capacity Prior Open - International 0.00 138,337.21 Signed 2015-09-19 kindergarten in Berd, Marz of Quotations Building at the Local Level Tavoush TTV-14 / Reconstruction of ASIF Institutional the Drinking Water Supply Request for Single Stage - One 2018-09- IBRD / 84830 Strengthening and Project Post Limited 121,140.00 117,044.39 Completed 2018-01-30 2018-02-02 2018-03-06 2018-03-01 System in Varagavan, marz of Quotations Envelope 17 Management Tavush TSQ-14 / Reconstruction of ASIF Institutional Single Stage - One 2019-08- the Kindergarten in Village IBRD / 84830 Strengthening and Project Post Request for Bids Open - National 412,665.00 316,541.82 Completed 2018-01-29 2018-01-29 2018-01-30 2018-01-31 2018-02-27 2018-02-22 2018-04-13 2018-03-15 2018-05-26 2018-05-04 Envelope 09 Tegh, marz of Syunik Management TAR-08 AND TAT-09 / Reconstruction of the Kindergarden in Metsamor, ASIF Institutional Single Stage - One 2019-10- Marz of Armavir and IBRD / 84830 Strengthening and Project Post Request for Bids Open - National 808,162.00 591,539.50 Completed 2018-03-06 2018-03-05 2018-03-11 2018-03-06 2018-04-08 2018-04-03 2018-05-23 2018-04-11 2018-07-04 2018-05-14 Envelope 02 Reconstruction of the Management Kindergarden in Aygavan, Marz of Ararat (with 2 lots) TTV-17 / Reconstruction of ASIF Institutional the External Water Supply Single Stage - One 2019-07- IBRD / 84830 Strengthening and Project Post Request for Bids Open - National 319,194.00 264,640.70 Completed 2018-04-03 2018-05-07 2018-04-10 2018-05-11 2018-05-08 2018-06-08 2018-06-22 2018-06-25 2018-08-03 2018-07-06 System in Tsaghkavan, marz Envelope 09 Management of Tavush TAN-13 / Renovation of the Kindergarten Area in Village ASIF Institutional Request for Single Stage - One 2018-08- Aghdzq and Construction of IBRD / 84830 Strengthening and Project Post Limited 38,551.00 38,127.02 Completed 2018-04-10 2018-04-06 2018-06-01 2018-04-25 Quotations Envelope 05 the External Engineering Nets, Management marz of Aragatsotn TAT-11 / Reconstruction of ASIF Institutional one building of Yeraskh Single Stage - One 2020-04- IBRD / 84830 Strengthening and Project Post Request for Bids Open - National 296,410.00 243,112.08 Signed 2019-02-13 2019-02-25 2019-02-15 2019-03-05 2019-03-15 2019-04-02 2019-04-14 2019-04-19 2019-05-26 2019-05-20 school into kindergarten, Envelope 10 Management marz of Ararat TVZ-09 / Reconstruction of Support to Socio-Economic Request for Single Stage - One 2019-12- Khndzorut water source and IBRD / 84830 Development and Capacity Post Open - National 33,000.00 33,737.31 Completed 2019-08-31 2019-09-04 2019-10-05 2019-09-24 Quotations Envelope 14 drinking water line Building at the Local Level TTV-18 / Reconstruction of Support to Socio-Economic the Drinking Water Single Stage - One 2021-01- IBRD / 84830 Development and Capacity Post Request for Bids Open - National 391,000.00 325,626.73 Signed 2019-11-14 2019-11-12 2019-11-19 2019-11-13 2019-12-17 2019-12-10 2020-01-16 2019-12-20 2020-02-27 2020-02-06 Distributing Network of Envelope 22 Building at the Local Level Paravakar TSH-21 / Construction of "St. Support to Socio-Economic Single Stage - One 2021-07- Mariam" Kindergarten in IBRD / 84830 Development and Capacity Post Request for Bids Open - National 412,000.00 353,039.60 Signed 2020-03-10 2020-03-10 2020-03-15 2020-03-10 2020-04-12 2020-04-07 2020-05-12 2020-04-20 2020-06-23 2020-06-03 Envelope 18 Gyumri Building at the Local Level TSQ-16 / Construction of the Support to Socio-Economic Single Stage - One 2021-11- drinking water pipeline in IBRD / 84830 Development and Capacity Post Request for Bids Open - National 177,000.00 0.00 Canceled 2020-12-25 2020-12-23 2020-12-30 2020-12-23 2021-02-03 2021-01-27 2021-03-05 2021-03-23 2021-04-07 Envelope 03 Khnatsakh community Building at the Local Level TLR-13 / Reconstruction of Support to Socio-Economic the second building of Single Stage - One 2022-05- IBRD / 84830 Development and Capacity Post Request for Bids Open - National 364,000.00 283,455.95 Signed 2021-03-17 2021-03-15 2021-03-24 2021-03-16 2021-04-21 2021-04-12 2021-05-21 2021-04-26 2021-07-02 2021-05-20 kindergarten No. 11 in Envelope 28 Building at the Local Level Vanadzor TSH-22 / "Zangak" Support to Socio-Economic Under Single Stage - One 2022-08- kindegarten construction of IBRD / 84830 Development and Capacity Post Request for Bids Open - National 443,000.00 0.00 Implementat 2021-04-27 2021-04-16 2021-05-04 2021-04-16 2021-06-01 2021-05-14 2021-07-01 2021-06-16 2021-08-12 Envelope 07 Gyumri Building at the Local Level ion Support to Socio-Economic Under TSH-23 / Reconstruction of Single Stage - One 2022-04- IBRD / 84830 Development and Capacity Post Request for Bids Open - National 311,000.00 265,772.46 Implementat 2021-04-27 2021-04-16 2021-05-02 2021-04-16 2021-05-30 2021-05-14 2021-06-29 2021-06-09 2021-08-10 the kindegarten of Panik Envelope 07 Building at the Local Level ion Support to Socio-Economic Under TSH-19 / Construction of Single Stage - One 2022-08- IBRD / 84830 Development and Capacity Post Request for Bids Open - National 407,000.00 0.00 Implementat 2021-04-27 2021-04-19 2021-05-04 2021-04-19 2021-06-01 2021-05-17 2021-07-01 2021-06-16 2021-08-12 kindegarten of Horom Envelope 07 Building at the Local Level ion Page 1 TSQ-16-2 / Construction of Support to Socio-Economic Single Stage - One 2022-03- the drinking water pipeline in IBRD / 84830 Development and Capacity Post Request for Bids Open - National 160,000.00 159,703.08 Signed 2021-04-30 2021-04-20 2021-05-05 2021-04-20 2021-06-02 2021-05-18 2021-07-02 2021-06-02 2021-08-13 2021-06-24 Envelope 11 Khnatsakh Building at the Local Level W-27.29 / Lot 1 "W-27, Construction and repair of irrigation system in Byureghavan enlarged Request for Bids - Support to Intercommunity Under community" Single Stage - One Small Works SPD 2022-06- IBRD / 84830 Social and Economic Post Request for Bids Open - National 805,000.00 0.00 Implementat 2021-06-10 2021-06-01 2021-06-15 2021-06-01 2021-07-13 2021-08-12 2021-09-23 Lot 2 "W-29, Construction and Envelope (1 envelope 20 Development Initiatives ion repair of a gravity irrigation process) system in Hoghmik, Goghovit, and Torosgyugh settlements of Sarapat community" AFT-TV-02 / Construction of pumping station, drinking Request for Bids - water supply pipeline and Support to Socio-Economic Under Single Stage - One Small Works SPD 2022-06- daily regulation reservoir IBRD / 90600 Development and Capacity Post Request for Bids Open - National 240,000.00 0.00 Implementat 2021-06-10 2021-06-01 2021-06-15 2021-06-01 2021-07-13 2021-08-12 2021-09-23 Envelope (1 envelope 20 (DRR), reconstruction of the Building at the Local Level ion process) distribution network of Lchkadzor settlement AFT-TV-01 / Construction of pumping station, drinking Request for Bids - water supply pipeline and Support to Socio-Economic Under Single Stage - One Small Works SPD 2022-08- daily regulation reservoir IBRD / 90600 Development and Capacity Post Request for Bids Open - National 361,000.00 0.00 Implementat 2021-06-21 2021-06-21 2021-06-26 2021-06-21 2021-07-24 2021-08-23 2021-10-04 Envelope (1 envelope 30 (DRR), reconstruction of the Building at the Local Level ion process) distribution network of Archis settlement W-29 / Construction and repair of a gravity irrigation Support to Intercommunity Single Stage - One 2022-05- system in Hoghmik, Goghovit, IBRD / 84830 Social and Economic Post Request for Bids Open - National 285,000.00 0.00 Canceled 2021-04-27 2021-04-19 2021-05-04 2021-04-19 2021-06-01 2021-05-17 2021-07-01 2021-08-12 Envelope 09 and Torosgyugh settlements Development Initiatives of Sarapat community GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Support to Socio-Economic TG-03 / Procurement of IT Request for IBRD / 84830 Development and Capacity Prior Open - International 0.00 9,473.65 Signed 2015-12-28 equipment Quotations Building at the Local Level Support to Socio-Economic TG-04-2 / Procurement of 2 Single Stage - One IBRD / 84830 Development and Capacity Prior Request for Bids Open - National 0.00 33,912.43 Signed 2016-05-19 2016-05-30 compact SUV Cars Envelope Building at the Local Level Support to Socio-Economic TG-04-3 / Procurement of 1 Single Stage - One IBRD / 84830 Development and Capacity Prior Request for Bids Open - National 0.00 61,421.28 Canceled 2016-05-19 SUV Car Envelope Building at the Local Level Support to Socio-Economic TG-02 / Procurement of Request for IBRD / 84830 Development and Capacity Prior Open - International 0.00 7,841.45 Signed 2016-05-27 furniture for ATDF Quotations Building at the Local Level Support to Socio-Economic TG-04-1 / Procurement of 5 Single Stage - One IBRD / 84830 Development and Capacity Prior Request for Bids Open - National 0.00 62,761.66 Signed 2016-05-21 2016-05-30 Sedan Cars- Lot 1 Envelope Building at the Local Level TG-11 / Supply of furniture ASIF Institutional Request for Single Stage - One for kindergartens for marzes IBRD / 84830 Strengthening and Project Post Limited 96,700.00 96,365.03 Completed 2018-03-11 2018-03-07 2018-05-06 2018-03-26 2018-07-15 2018-08-23 Quotations Envelope of RA Management TG-12 / Supply of goods for kindergartens, schools and ASIF Institutional Single Stage - One community centers in the IBRD / 84830 Strengthening and Project Post Request for Bids Open - National 184,000.00 150,596.63 Completed 2018-08-06 2018-08-14 2018-08-11 2018-08-15 2018-09-08 2018-09-12 2018-10-08 2018-09-28 2018-11-19 2018-10-05 2019-02-02 2019-02-21 Envelope marzes of RA (consisted of 3 Management Lots) TIIG-01 / Procurement of Support to Intercommunity Single Stage - One Vehicles, Equipment and IBRD / 84830 Social and Economic Post Request for Bids Open - National 924,950.00 806,891.39 Completed 2018-10-24 2018-10-24 2018-10-29 2018-11-08 2018-11-26 2018-11-27 2018-12-26 2018-12-14 2019-02-06 2019-01-11 2019-05-07 2019-05-08 Envelope Trash Bins for Communities Development Initiatives TG-13 / Procurement of ASIF Institutional Request for Single Stage - One furniture for the IBRD / 84830 Strengthening and Project Post Limited 45,115.00 30,222.32 Completed 2018-11-15 2018-11-12 2018-11-20 2018-11-14 2018-11-27 2018-11-21 2018-12-07 2018-11-22 2018-12-21 2018-11-30 2019-01-15 2018-12-25 Proposals Envelope kindergartens of the regions Management of the RoA TIIG-02 / Procurement of Support to Intercommunity Single Stage - One Vehicles and Equipment for IBRD / 84830 Social and Economic Post Request for Bids Open - National 933,970.00 492,656.34 Completed 2019-03-28 2019-04-03 2019-04-02 2019-04-04 2019-04-30 2019-05-02 2019-05-30 2019-06-19 2019-07-11 2019-06-26 2019-10-09 2019-09-13 Envelope Communities Development Initiatives TG-14 / Supply of furniture ASIF Institutional Request for Single Stage - One for schools and kindergartens IBRD / 84830 Strengthening and Project Post Open - National 89,000.00 56,070.85 Completed 2019-04-08 2019-04-18 2019-06-03 2019-05-22 2019-10-01 2019-10-29 Quotations Envelope for marzes of RoA Management TIIG-03 / Procurement of Support to Intercommunity Single Stage - One Vehicles and Equipment for IBRD / 84830 Social and Economic Post Request for Bids Open - National 933,460.00 920,649.72 Completed 2019-05-24 2019-05-31 2019-05-29 2019-06-04 2019-06-26 2019-07-02 2019-07-26 2019-07-18 2019-09-06 2019-08-16 2019-12-05 2019-12-14 Envelope Communities Development Initiatives Support to Intercommunity TIIG-04 / Procurement of 4 Single Stage - One IBRD / 84830 Social and Economic Post Request for Bids Open - National 377,000.00 272,097.79 Completed 2019-06-24 2019-06-25 2019-06-29 2019-07-31 2019-07-27 2019-07-31 2019-08-26 2019-08-06 2019-10-07 2019-08-27 2019-12-21 2019-12-18 Multifunctional Excavators Envelope Development Initiatives TIIG-05 / Procurement of Support to Intercommunity Vehicles and Equipment for Single Stage - One IBRD / 84830 Social and Economic Post Request for Bids Open - National 893,080.00 741,001.05 Completed 2019-08-05 2019-08-15 2019-08-10 2019-08-29 2019-09-07 2019-09-13 2019-09-08 2019-09-27 2019-10-20 2019-11-01 2020-01-18 2020-01-21 Communities consisted of 9 Envelope Development Initiatives Lots TIIG-06 / Procurement of Support to Intercommunity Single Stage - One Vehicles and Equipment for IBRD / 84830 Social and Economic Post Request for Bids Open - National 685,995.00 416,500.74 Signed 2019-09-10 2019-09-11 2019-09-15 2019-09-13 2019-09-17 2019-10-17 2019-10-17 2019-11-01 2019-11-28 2019-11-25 2020-02-26 2019-12-12 Envelope Communities Development Initiatives Support to Intercommunity TIIG-07 / Procurement of 4 Single Stage - One IBRD / 84830 Social and Economic Post Request for Bids Open - National 378,000.00 369,714.75 Completed 2019-11-06 2019-10-31 2019-11-11 2019-11-01 2019-12-09 2019-11-29 2020-01-08 2019-12-04 2020-02-19 2019-12-17 2020-05-04 2020-06-02 Multifunctional Excavators Envelope Development Initiatives Page 2 TG-15 / Supply of furniture ASIF Institutional for kindergartens, schools and Request for Single Stage - One IBRD / 84830 Strengthening and Project Post Open - National 34,850.00 26,899.28 Signed 2019-12-07 2019-12-26 2020-01-19 2020-01-17 2020-03-04 2020-02-28 cultural centers for the Quotations Envelope Management marzes of RoA TIIG-06/8 / TIIG-06/8 Support to Intercommunity Contract "1 Hydraulic Twist IBRD / 84830 Social and Economic Post Direct Selection Direct 2,310.00 1,775.45 Completed 2020-01-08 2020-01-09 2020-01-08 2019-09-12 2020-01-08 2019-12-04 2020-01-08 2019-12-16 Bucket" Development Initiatives ASIF Institutional TIIG-08 / Procurement of Request for Single Stage - One IBRD / 84830 Strengthening and Project Post Open - National 93,025.00 72,076.69 Completed 2020-03-02 2020-02-28 2020-04-13 2020-04-15 2020-06-12 2020-06-18 500 Metal Trash Bins Quotations Envelope Management TIIG-09 / Procurement of Support to Intercommunity communal equipment for Single Stage - One IBRD / 84830 Social and Economic Post Request for Bids Open - National 916,000.00 862,774.43 Completed 2020-03-15 2020-03-17 2020-03-20 2020-03-18 2020-04-17 2020-04-15 2020-05-17 2020-05-06 2020-06-28 2020-06-10 2020-09-26 2020-09-10 Areni, Sisian, Akhtala, Envelope Development Initiatives Gladzor, Eghegis communities TIIG-10 / Procurement of Agricultural Equipment for Support to Intercommunity Single Stage - One Shnogh, Akhtala, Eghegis, IBRD / 84830 Social and Economic Post Request for Bids Open - National 949,585.00 0.00 Canceled 2020-03-29 2020-04-01 2020-04-03 2020-04-01 2020-05-01 2020-05-31 2020-07-12 2020-10-10 Envelope Sarchapet, Ani, Eghvard Development Initiatives Communities TIIG-11 / Procurement of Agricultural Heavy Equipment Support to Intercommunity Single Stage - One for Shnogh, Akhtala, IBRD / 84830 Social and Economic Post Request for Bids Open - National 812,000.00 678,871.19 Completed 2020-04-29 2020-05-08 2020-05-04 2020-05-08 2020-06-01 2020-06-05 2020-07-01 2020-06-22 2020-08-12 2020-08-12 2020-11-10 2020-11-13 Envelope Yeghegis, Sarchapet, Ani, Development Initiatives Yeghvard Communities TIIGS-01 / Procurement of a Support to Intercommunity Request for Single Stage - One Motor Cultivator for Akhtala IBRD / 84830 Social and Economic Post Open - National 5,000.00 5,059.10 Signed 2020-05-04 2020-05-09 2020-06-29 2020-06-17 2020-08-28 Quotations Envelope Community Development Initiatives TIIGS-02 / Procurement of Support to Intercommunity Agricultural Sprayers for Request for Single Stage - One IBRD / 84830 Social and Economic Post Open - National 21,000.00 7,059.79 Signed 2020-05-04 2020-05-09 2020-06-29 2020-06-17 2020-08-28 Shnogh, Akhtala and Quotations Envelope Development Initiatives Sarchapet Communities TIIGS-03 / Procurement of Support to Intercommunity Seed Drills for Shnogh, Request for Single Stage - One IBRD / 84830 Social and Economic Post Open - National 53,000.00 37,834.27 Signed 2020-05-04 2020-05-09 2020-06-29 2020-06-17 2020-08-28 Akhtala and Sarchapet Quotations Envelope Development Initiatives Communities TIIGS-04 / Procurement of Support to Intercommunity Request for Single Stage - One Baling Machines for Yeghegis IBRD / 84830 Social and Economic Post Open - National 32,000.00 23,671.07 Signed 2020-05-04 2020-05-09 2020-06-29 2020-06-17 2020-08-28 Quotations Envelope and Yeghvard Communities Development Initiatives TIIGS-05 / Procurement of Support to Intercommunity Grass-Mowing Machines for Request for Single Stage - One IBRD / 84830 Social and Economic Post Open - National 6,500.00 3,426.08 Signed 2020-05-04 2020-05-09 2020-06-29 2020-06-17 2020-08-28 Akhtala, Yeghegis and Quotations Envelope Development Initiatives Yeghvard Communities TIIGS-06 / Procurement of Ploughs, Harrows and Support to Intercommunity Request for Single Stage - One Cultivators for Shnogh, IBRD / 84830 Social and Economic Post Open - National 73,000.00 53,397.79 Signed 2020-05-04 2020-05-09 2020-06-29 2020-06-17 2020-08-28 Quotations Envelope Yeghegis, Sarchapet and Development Initiatives Yeghvard Communities TIIG-12 / Procurement of communal equipment for Support to Intercommunity Under Single Stage - One Shoghakat, Akhtala, Gladzor, IBRD / 84830 Social and Economic Post Request for Bids Open - National 983,000.00 831,467.34 Implementati 2020-05-22 2020-05-27 2020-05-27 2020-06-28 2020-06-24 2020-06-29 2020-07-24 2020-08-04 2020-09-04 2020-09-08 2020-12-03 2021-02-10 Envelope Yeghegis, Sarchapet, Ani, Development Initiatives on Yeghvard Communities TIIG-13 / Procurement of Agricultural Heavy Equipment Support to Intercommunity Single Stage - One for Kapan, Metsavan, Akunq, IBRD / 84830 Social and Economic Post Request for Bids Open - National 483,000.00 410,152.86 Completed 2020-06-22 2020-06-29 2020-06-27 2020-07-06 2020-07-25 2020-07-27 2020-08-24 2020-08-17 2020-10-05 2020-09-28 2021-01-03 2020-12-14 Envelope Geghamasar, Alaverdi Development Initiatives Communities TIIG-14 / Procurement of Support to Intercommunity Communal Equipment for Single Stage - One IBRD / 84830 Social and Economic Post Request for Bids Open - National 957,000.00 780,364.18 Completed 2020-07-13 2020-07-10 2020-07-18 2020-07-13 2020-08-15 2020-08-13 2020-09-14 2020-09-14 2020-10-26 2020-10-20 2021-02-23 2021-03-17 Kapan, Metsavan, Marmashen Envelope Development Initiatives Communities TIIG-15 / Procurement of Support to Intercommunity Communal Equipment for Single Stage - One IBRD / 84830 Social and Economic Post Request for Bids Open - National 771,550.00 585,502.29 Signed 2020-08-19 2020-08-21 2020-08-24 2020-08-24 2020-09-21 2020-09-22 2020-10-21 2020-09-30 2020-12-02 2020-11-05 2021-04-01 2021-02-26 Geghamasar, Akunq, Alaverdi Envelope Development Initiatives Communities TG-16 / Procurement of ASIF Institutional Request for Single Stage - One Computer equipment for IBRD / 84830 Strengthening and Project Post Open - National 21,000.00 20,982.30 Signed 2020-09-30 2020-09-29 2020-11-25 2020-10-23 2021-02-03 Quotations Envelope ATDF Management Support to Intercommunity TIIGS-07 / Procurement of a Request for Single Stage - One IBRD / 84830 Social and Economic Post Open - National 70,000.00 65,740.35 Completed 2020-10-03 2020-09-28 2020-11-28 2020-10-23 2021-02-26 2020-12-17 Bus for Ani community Quotations Envelope Development Initiatives TIIGS-08 / Procurement of a Support to Intercommunity Request for Single Stage - One Mini-loader for Yeghvard IBRD / 84830 Social and Economic Post Open - National 54,000.00 0.00 Canceled 2020-10-03 2020-09-28 2020-11-28 2021-02-26 Quotations Envelope community Development Initiatives Support to Intercommunity TIIGS-10 / Procurement of 1 Request for Single Stage - One IBRD / 84830 Social and Economic Post Open - National 53,000.00 47,780.97 Completed 2020-10-26 2020-10-20 2020-12-21 2020-11-13 2021-04-20 2020-12-18 Mini-loader Quotations Envelope Development Initiatives TIIGS-09 / Procurement of 2 Support to Intercommunity Request for Single Stage - One technical assistance cars with IBRD / 84830 Social and Economic Post Open - National 51,000.00 50,998.75 Completed 2020-10-26 2020-10-20 2020-12-21 2020-11-13 2021-04-20 2021-02-09 Quotations Envelope attachments Development Initiatives Support to Intercommunity TIIGS-11 / Procurement of Request for Single Stage - One IBRD / 84830 Social and Economic Post Open - National 18,000.00 45,127.49 Completed 2020-10-26 2020-11-10 2020-12-21 2020-12-07 2021-02-19 2020-12-15 250 Garbage Container Quotations Envelope Development Initiatives TIIG-16 / Procurement of Support to Intercommunity Single Stage - One Communal Equipment for IBRD / 84830 Social and Economic Post Request for Bids Open - National 288,000.00 274,664.33 Signed 2020-11-13 2020-11-12 2020-11-18 2020-12-02 2020-12-16 2020-12-21 2021-01-15 2020-12-29 2021-02-26 2021-02-11 2021-06-26 2021-04-22 Envelope Jrvezh Community Development Initiatives Page 3 TIIG-17 / Supply and installation of solar Support to Intercommunity Under Single Stage - One photovoltaic stations on the IBRD / 84830 Social and Economic Post Request for Bids Open - National 191,600.00 160,964.78 Implementati 2020-11-20 2021-04-12 2020-11-25 2021-04-12 2020-12-23 2021-05-10 2021-01-22 2021-05-27 2021-03-05 2021-06-03 Envelope territories of municipal Development Initiatives on organizations in Charentsavan TG-17 / Procurement of a ASIF Institutional Request for Single Stage - One hybrid portable computer for IBRD / 84830 Strengthening and Project Post Open - National 2,500.00 2,047.05 Completed 2020-12-24 2021-01-18 2021-01-26 2021-02-05 2021-04-06 2021-03-01 Quotations Envelope ATDF Management NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TEX-01 / Expertise of buildings stability, ventilation, Support to Socio-Economic Consultant power and water supplies and IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 12,145.80 Signed 2015-06-30 2015-06-30 drainage systems (8 mictro- Building at the Local Level Selection projects) TPD-05 / Architectural Design for Construction, Support to Socio-Economic Consultant Rehabilitation, Renovation & IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 36,498.39 Signed 2015-06-30 2015-06-30 Reconstruction of Buildings Building at the Local Level Selection (two micro-projects) TPD -01 / Architectural Support to Socio-Economic Consultant Design for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 51,254.80 Signed 2015-06-30 2015-06-30 Rehabilitation, Renovation & Building at the Local Level Selection Reconstruction of Buildings TPD 06 / Architectural Design Support to Socio-Economic Consultant for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 27,397.79 Signed 2015-06-30 2015-06-30 Rehabilitation, Renovation & Building at the Local Level Selection Reconstruction of Buildings TPD-03 / Architectural Support to Socio-Economic Consultant Design for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 45,112.36 Signed 2015-06-30 2015-06-30 Rehabilitation, Renovation & Building at the Local Level Selection Reconstruction of Buildings TPD-02 / Architectural Design for Construction, Support to Socio-Economic Consultant Rehabilitation, Renovation & IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 18,929.73 Signed 2015-06-30 2015-06-30 Reconstruction of Buildings Building at the Local Level Selection (two micro-projects) TBD-04 / Architectural Design for Construction, Support to Socio-Economic Consultant Rehabilitation, Renovation & IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 31,145.69 Signed 2015-06-30 2015-06-30 Reconstruction of Buildings Building at the Local Level Selection (two micro-projects) TEX-02 / Expertise of Support to Socio-Economic Consultant Architectural Design (12 micro- IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 17,902.25 Signed 2015-07-08 2015-07-08 projects) Building at the Local Level Selection TPD-01-1 / Author Support to Socio-Economic Consultant Supervision for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 6,892.20 Signed 2015-07-30 2015-07-31 Rehabilitation, Renovation& Building at the Local Level Selection Reconstruction of Buildings TPD-02-1 / Author Support to Socio-Economic Consultant Supervision for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 2,665.23 Signed 2015-07-30 2015-07-31 Rehabilitation, Renovation& Building at the Local Level Selection Reconstruction of Buildings TPD-03-1 / Author Support to Socio-Economic Consultant Supervision for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 4,623.95 Signed 2015-07-30 2015-07-31 Rehabilitation, Renovation& Building at the Local Level Selection Reconstruction of Buildings TPD-04-1 / Author Support to Socio-Economic Consultant Supervision for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 5,012.55 Canceled 2015-08-17 Rehabilitation, Renovation& Building at the Local Level Selection Reconstruction of Buildings TPD-05-1 / Author Support to Socio-Economic Consultant Supervision for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 4,848.52 Signed 2015-07-30 2015-07-31 Rehabilitation, Renovation& Building at the Local Level Selection Reconstruction of Buildings TPD-06-1 / Author Support to Socio-Economic Consultant Supervision for Construction, IBRD / 84830 Development and Capacity Prior Qualification Open - International 0.00 3,877.33 Signed 2015-07-30 2015-07-31 Rehabilitation, Renovation& Building at the Local Level Selection Reconstruction of Buildings AUD-17 / AUDIT OF THE ARMENIAN TERRITORIAL DEVELOPMENT FUND and OF ASIF Institutional Consultant THE SOCIAL INVESTMENT AND IBRD / 84830 Strengthening and Project Post Qualification Open - National 10,400.00 16,723.84 Completed 2018-01-31 2018-02-06 2018-02-07 2018-02-06 2018-03-07 2018-02-26 2018-03-28 2018-03-12 2018-04-18 2018-03-12 2018-05-15 2018-06-30 LOCAL DEVELOPMENT (SILD) Management Selection PROJECT FOR THE YEAR ENDED DECEMBER 31, 2017 Page 4 AUD-18 / AUDIT OF THE ARMENIAN TERRITORIAL DEVELOPMENT FUND and OF ASIF Institutional Consultant THE SOCIAL INVESTMENT AND IBRD / 84830 Strengthening and Project Post Qualification Open - National 6,691.00 24,294.41 Completed 2018-11-29 2018-11-23 2018-12-04 2018-12-27 2018-12-30 2018-12-24 2019-01-20 2018-12-27 2019-02-08 2018-12-28 2019-02-26 2019-06-27 LOCAL DEVELOPMENT (SILD) Management Selection PROJECT FOR THE YEAR ENDED DECEMBER 31, 2018 TPD-31 / Design and Author's Supervision for ASIF Institutional Consultant Construction of the IBRD / 84830 Strengthening and Project Post Qualification Open - National 10,500.00 7,842.11 Signed 2019-08-05 2019-08-07 2019-08-19 2019-08-15 2019-10-02 2019-08-30 2019-10-09 2019-09-11 2019-11-13 2019-09-11 2020-02-26 kindergarten after "Saint Management Selection Maryam" in Gyumri TBA-01 / BENEFICIARIES ASSESSMENT OF SOCIAL ASIF Institutional Consultant INVESTMENT AND LOCAL IBRD / 84830 Strengthening and Project Post Qualification Open - National 50,000.00 32,629.20 Signed 2019-10-30 2019-10-30 2019-11-20 2019-12-09 2020-01-01 2019-11-26 2020-01-15 2019-12-17 2020-02-12 2019-12-17 2020-06-03 DEVELOPMENT PROJECT Management Selection IMPACT TCWA-01 / Assessment of CIVIL WORKS QUALITY, COST AND MAINTENANCE of ASIF Institutional Consultant infrastructures rehabilitated in IBRD / 84830 Strengthening and Project Post Qualification Open - National 30,000.00 0.00 Canceled 2019-10-30 2019-10-30 2019-11-20 2019-12-09 2020-01-01 2020-01-15 2020-02-12 2020-05-06 frames of the Component 1 of Management Selection Social Investment and Local Development Project TS-09 / Technical Supervision of Reconstruction ASIF Institutional Consultant of the Drinking Water IBRD / 84830 Strengthening and Project Post Qualification Open - National 5,860.00 6,622.88 Signed 2019-12-25 2019-12-23 2020-01-15 2019-12-24 2020-02-28 2020-02-05 2020-03-29 2020-02-24 2020-05-03 2020-02-24 2021-03-29 Distributing Network of Management Selection Paravakar. TPD-33 / Design and Author's Supervision for ASIF Institutional Consultant Reconstruction of the second IBRD / 84830 Strengthening and Project Post Qualification Open - National 20,870.00 14,178.31 Signed 2020-02-27 2020-03-05 2020-03-18 2020-03-11 2020-05-01 2020-04-06 2020-05-08 2020-04-20 2020-06-12 2020-04-20 2020-09-25 building of the Kindergarten N Management Selection 11 in Vanadzor, marz of Lori . TPD-34 / Design and Author's Supervision for ASIF Institutional Consultant Construction of the potable IBRD / 84830 Strengthening and Project Post Qualification Open - National 12,620.00 0.00 Canceled 2020-02-27 2020-03-18 2020-05-01 2020-05-08 2020-06-12 2020-09-10 water pipeline of Khnatsakh, Management Selection marz of Syunik TEX-12 / Survey the technical ASIF Institutional Consultant condition of the Kindergarten IBRD / 84830 Strengthening and Project Post Qualification Open - National 625.00 620.48 Signed 2020-02-27 2020-03-05 2020-03-19 2020-03-11 2020-05-02 2020-04-10 2020-06-01 2020-05-06 2020-07-06 2020-05-06 2021-01-02 N 11 in Vanadzor, marz of Management Selection Lori . AUD-19 / AUDIT OF THE ARMENIAN TERRITORIAL DEVELOPMENT FUND and ASIF Institutional Consultant AUDIT OF THE SOCIAL IBRD / 84830 Strengthening and Project Post Qualification Open - National 30,918.00 23,973.29 Signed 2020-03-10 2020-03-04 2020-03-15 2020-03-18 2020-04-19 2020-04-10 2020-05-10 2020-05-05 2020-05-29 2020-05-06 2020-09-06 INVESTMENT AND LOCAL Management Selection DEVELOPMENT (SILD) PROJECT FOR THE YEAR ENDED DECEMBER 31, 2019 TS-10 / Technical ASIF Institutional Consultant supervision for Construction IBRD / 84830 Strengthening and Project Post Qualification Open - National 6,280.00 6,460.56 Signed 2020-04-07 2020-04-01 2020-04-28 2020-04-23 2020-06-11 2020-05-15 2020-07-11 2020-05-21 2020-08-15 2020-05-26 2021-09-09 of the kindergarten after Management Selection "Saint Mariam" in Gyumri. TCWA-02 / Assessment of Civil Works Quality, Cost and Maintenance of Infrastructures ASIF Institutional Consultant Rehabilitated in Frames of IBRD / 84830 Strengthening and Project Post Qualification Open - National 30,000.00 34,292.85 Signed 2020-05-04 2020-07-10 2020-05-25 2020-08-04 2020-07-06 2020-08-31 2020-07-20 2020-11-13 2020-08-17 2020-11-13 2020-11-09 Component 1 of Social Management Selection Investment and Local Development Project TPD-35 / Modification and siting of Design, Author's ASIF Institutional Consultant Supervision for construction IBRD / 84830 Strengthening and Project Post Qualification Open - National 17,775.00 16,832.17 Signed 2020-06-24 2020-06-18 2020-07-24 2020-06-22 2020-09-06 2020-07-27 2020-09-13 2020-08-07 2020-10-18 2020-08-10 2021-10-18 of the Horom community and Management Selection Gyumri community "Zangak" kindergartens, marz of Shirak. TPD-36 / Design and Author's Supervision for the ASIF Institutional Consultant Reconstruction of Panik IBRD / 84830 Strengthening and Project Post Qualification Open - National 19,735.00 18,647.11 Signed 2020-07-10 2020-07-06 2020-08-09 2020-07-21 2020-09-22 2020-08-14 2020-09-29 2020-09-01 2020-11-03 2020-09-03 2021-10-04 community kindergarten, Management Selection marz of Shirak. TEX-13 / Survey the technical condition for the ASIF Institutional Consultant Reconstruction of Panik IBRD / 84830 Strengthening and Project Post Qualification Open - National 735.00 699.59 Signed 2020-06-24 2020-06-18 2020-07-24 2020-06-22 2020-09-06 2020-07-27 2020-10-06 2020-08-08 2020-11-10 2020-08-10 2020-11-25 community kindergarten, Management Selection marz of Shirak. TPD-37 / Design and author’s supervision of Construction and repair of irrigation system in Byureghavan enlarged ASIF Institutional Consultant community and of IBRD / 84830 Strengthening and Project Post Qualification Open - National 40,850.00 40,204.35 Signed 2020-08-10 2020-08-04 2020-08-31 2020-09-02 2020-10-14 2020-09-29 2020-11-13 2020-10-12 2020-12-18 2020-10-14 2021-12-18 Construction and repair of Management Selection gravity irrigation system in Hoghmik, Goghovit and Torosgyugh settlements included in Sarapat community. TEX-14 / Expertise of ASIF Institutional Consultant Architectural Design (8 micro- IBRD / 84830 Strengthening and Project Post Qualification Open - National 7,720.00 6,998.00 Signed 2020-10-26 2020-10-19 2020-11-16 2020-11-04 2020-12-30 2020-11-26 2021-01-29 2020-12-11 2021-03-05 2020-12-16 2022-03-05 projects). Management Selection TS-11 / Technical Support to Socio-Economic Consultant supervision of "Construction Under IBRD / 84830 Development and Capacity Post Qualification Open - National 3,100.00 0.00 2021-03-11 2021-03-11 2021-03-25 2021-04-02 2021-04-22 2021-05-10 2021-05-06 2021-05-25 2021-05-30 of the drinking water pipeline Implementation Building at the Local Level Selection in Khnatsakh" Page 5 TPD-39 / Design and Support to Intercommunity Consultant author’s supervision of Under IBRD / 84830 Social and Economic Post Qualification Open - National 8,000.00 0.00 2021-03-12 2021-03-11 2021-03-26 2021-03-12 2021-04-23 2021-04-09 2021-05-07 2021-05-17 2022-03-13 Construction of a car park in Implementation Development Initiatives Selection Akunk community TS-12 / Technical supervision of Support to Socio-Economic Consultant "Reconstruction of the second IBRD / 84830 Development and Capacity Post Qualification Open - National 5,700.00 5,767.29 Signed 2021-03-24 2021-03-18 2021-04-14 2021-04-09 2021-05-12 2021-04-30 2021-05-19 2021-05-21 2021-06-07 2021-05-24 2022-05-03 building of kindergarten No. Building at the Local Level Selection 11 in Vanadzor" AUD-20 / "AUDIT OF THE ARMENIAN TERRITORIAL DEVELOPMENT FUND and ASIF Institutional Consultant AUDIT OF THE SOCIAL IBRD / 84830 Strengthening and Project Post Qualification Open - National 42,000.00 28,456.65 Signed 2021-03-29 2021-03-22 2021-04-12 2021-04-01 2021-05-10 2021-04-30 2021-05-15 2021-05-14 2021-05-25 2021-05-14 2021-07-09 INVESTMENT AND LOCAL Management Selection DEVELOPMENT (SILD) PROJECT FOR THE YEAR ENDED DECEMBER 31, 2020" TS-13 / Technical Supervision of 3 projects: "Construction of kindergarten Support to Socio-Economic Consultant Under of Horom", ""Zangak" IBRD / 84830 Development and Capacity Post Qualification Open - National 18,000.00 0.00 2021-05-13 2021-05-07 2021-06-03 2021-05-24 2021-07-01 2021-06-15 2021-07-08 2021-07-27 2022-07-22 Implementation kindergarten construction of Building at the Local Level Selection Gyumri", "Reconstruction of the kindergarten of Panik" TS-14 / Technical supervision of "Construction and repair of a gravity Support to Intercommunity Consultant irrigation system in Hoghmik, IBRD / 84830 Social and Economic Post Qualification Open - National 4,400.00 0.00 Canceled 2021-05-13 2021-05-07 2021-06-03 2021-07-01 2021-07-08 2021-07-27 2022-02-22 Goghovit, and Torosgyugh Development Initiatives Selection settlements of Sarapat community" TS-15 / Technical supervision of "W-29, Construction and repair of a gravity irrigation system in Hoghmik, Goghovit, and Support to Intercommunity Consultant Torosgyugh settlements of IBRD / 84830 Social and Economic Post Qualification Open - National 12,100.00 0.00 Under Review 2021-07-05 2021-06-21 2021-07-26 2021-08-23 2021-08-30 2021-09-18 2022-07-15 Sarapat community, W-27, Development Initiatives Selection Construction and repair of irrigation system in Byureghavan enlarged community" AFT-TS-01 / Technical supervision of three projects: Construction of the pumping station and drinking water Support to Socio-Economic Consultant supply pipeline, major IBRD / 90600 Development and Capacity Post Qualification Open - National 13,100.00 0.00 Under Review 2021-07-05 2021-06-21 2021-07-26 2021-08-23 2021-08-30 2021-09-18 2022-08-14 renovation of the DRRs and Building at the Local Level Selection reconstruction of the distribution network of Archis, Lchkadzor and Movses of Tavush region TPD-40 / Design and author’s supervision of Support to Intercommunity Consultant Construction of the parking IBRD / 84830 Social and Economic Post Qualification Open - National 7,600.00 0.00 Under Review 2021-07-16 2021-06-21 2021-08-06 2021-09-19 2021-10-19 2021-11-23 2022-11-18 area in Geghamasar Development Initiatives Selection community INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TPD-32 / Authors supervision for Renovation of the Kindergarden Area in ASIF Institutional Village Aghdzq and IBRD / 84830 Strengthening and Project Post Direct Selection Direct 240.00 0.00 Canceled 2018-04-26 2018-04-20 2018-05-06 2018-04-20 2018-06-03 2018-08-07 Construction of the External Management Engineering Nets, Marz of Aragatsotn TIIC-01 / Selection of Support to Intercommunity Individual Estimator for providing IBRD / 84830 Social and Economic Post Consultant Open 10,740.00 0.00 Canceled 2018-10-30 2018-10-23 2018-12-02 2018-12-09 2018-12-30 2020-08-21 consulting services Development Initiatives Selection TPD-38/1 / Author's Support to Socio-Economic supervision of Construction of IBRD / 84830 Development and Capacity Post Direct Selection Direct 1,000.00 1,054.75 Signed 2021-02-17 2021-02-15 2021-02-27 2021-03-24 2021-03-10 2021-05-07 2021-10-06 drinking water pipeline for Building at the Local Level Khnatsakh Page 6 Procurement Plan THIRD PHASE OF CENTRAL ASIA ROAD LINKS PROJECT (CARs-3) PROJECT PREPARATION GRANT I. General 1. Bank’s approval Date of the procurement Plan [Original:] 2. Date of General Procurement Notice: 3/21/2017 3. Period covered by this procurement plan: The procurement period of project covered from March 2017to December 2017 July 9, 2010 PROCUREMENT Central Asia : Third Phase of the Central Asia Regional Links Program (CARs-3) PLAN General Information Country: Central Asia Bank’s Approval Date of the Original Procurement Plan: 2017-04-01 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159220 GPN Date: 2017-03-21 Project Name: Third Phase of the Central Asia Regional Links Program (CARs-3) Loan / Credit No: / , IDA / D3850, IDA / 63280 I Executing Agency(ies): PIG under Ministry of Transportation and Roads WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CARS3/NCB/CW/1 / Sustainable Tourism Pending Single Stage - One 2022-07- Construction of 5 tourist IDA / 63280 Development in Issyk-Kul Post Request for Bids Open - National 1,870,550.00 0.00 Implementat 2021-09-01 2021-09-08 2021-10-20 2021-11-19 2022-01-04 Envelope 05 service centers Oblast ion CARS3/NCB/CW/2 / Pending Rehabilitation of current Aviation Safety and Service Single Stage - One 2022-03- IDA / 63280 Post Request for Bids Open - National 490,000.00 0.00 Implementat 2021-04-30 2021-05-14 2021-06-25 2021-07-25 2021-09-02 buildings and facilities of the Provision Envelope 01 ion Kyrgyz Aviation Institute (KAI) CARS3/ICB/CW/1 / Road Regional Connections, rehabilitation (Tup-Karkyra till Associated Facilities and 38,500,000.0 2019-06- IDA / 63280 Prior Request for Bids Open - International 0.00 Canceled 2019-06-01 2019-06-01 2019-06-01 2019-06-01 2019-06-01 Kyrgyz-Kazakh border 37 Equipment in Issyk-Kul 0 01 km+14) Oblast CARS3/ICB/CW/1/1 / Road Regional Connections, Request for Bids - Pending rehabilitation (Tup-Karkyra till Associated Facilities and Small Works SPD 38,500,000.0 2020-05- IDA / 63280 Prior Request for Bids 0.00 Implementat 2019-06-01 2019-06-06 2019-07-18 2019-09-30 2019-11-04 Kyrgyz-Kazakh border 37 Equipment in Issyk-Kul (2 envelope 0 02 ion km+14) Oblast process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARS3/ICB/G/01 / Regional Connections, Equipment for road Pending Associated Facilities and Single Stage - One maintenance: snow removal IDA / 63280 Prior Request for Bids Open - International 4,100,000.00 0.00 Implementati 2022-02-02 2022-02-23 2022-04-24 2022-05-24 2022-07-05 2023-01-01 Equipment in Issyk-Kul Envelope equipment to ensure year- on Oblast round operation of the Tyup- Karkyra BCP road; Pending CARS3/ICB/G/02 / Office Aviation Safety and Service Single Stage - One IDA / D3850 Post Request for Bids Open - International 450,000.00 0.00 Implementati 2021-02-25 2021-03-11 2021-04-22 2021-05-22 2021-06-26 2021-12-23 equipment for СAA Provision Envelope on CARS3/ICB/G/03 / Goods Pending Aviation Safety and Service Single Stage - One and equipment for Kyrgyz IDA / D3850 Post Request for Bids Open - International 300,000.00 0.00 Implementati 2021-04-30 2021-05-10 2021-06-21 2021-07-21 2021-09-02 2022-02-07 Provision Envelope Aviation Institute (simulators) on CARS3/SH/G/01 / Testing Pending Aviation Safety and Service Request for Single Stage - One software for aviation IDA / D3850 Post Open - National 100,000.00 0.00 Implementati 2021-03-12 2021-05-25 2021-08-25 Provision Quotations Envelope personnel (CAA) on CARS3/SH/G/02 / Accident Pending Aviation Safety and Service Request for Single Stage - One investigation and aerodrome IDA / D3850 Post Open - National 80,000.00 0.00 Implementati 2021-03-12 2021-05-25 2021-07-26 Provision Quotations Envelope certification equipment (CAA) on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARS-3/CS-FBS-01 / CS for preparation of Feasibility Studies and Technical Designs for the modernization and Regional Connections, rehabilitation of Karakol and Associated Facilities and Fixed Budget / Prior Open - International 520,000.00 0.00 Canceled 2017-04-01 2017-04-01 2017-04-20 2017-04-28 2017-08-24 2017-05-26 2017-10-09 2017-06-02 2017-12-08 2017-06-19 2017-07-03 2017-12-29 Issyk-Kul Intnl Airports, Equipment in Issyk-Kul Selection including preparation of Oblast tender documents for infrastructure and equipment, finalization of safeguard docs CARS3/CS/LCS/01 / Project Project Management and Least Cost IDA / D3850 Post Open - International 100,000.00 70,224.00 Signed 2020-05-10 2020-10-30 2020-05-31 2020-12-15 2020-07-14 2021-01-22 2020-08-11 2021-02-19 2020-09-10 2021-03-09 2020-10-15 2021-03-16 2020-11-19 2021-03-19 2021-05-18 audit Implementation Selection CARS3/CS/CQS/03 / Regional Connections, Consulting Services for review Consultant Associated Facilities and of detailed design and IDA / D3850 Prior Qualification Open - International 500,000.00 499,573.75 Signed 2020-05-04 2020-06-01 2020-05-04 2020-06-09 2020-07-01 2020-10-15 2020-07-31 2020-12-05 2020-08-05 2020-12-09 2021-01-02 Equipment in Issyk-Kul preparation of tender Selection Oblast documents _Tyup_Kegen road CARS3/CS/QCBS/01 / Regional Connections, Consulting Services for Associated Facilities and Quality And Cost- Pending IDA / D3850 Prior Open - International 2,400,000.00 0.00 2021-03-10 2021-04-01 2021-05-30 2021-07-09 2021-08-08 2021-09-12 2021-10-12 2022-10-12 construction supervision of Equipment in Issyk-Kul Based Selection Implementation Tyup-Kegen road Oblast CARS3/CS/QCBS/03 / Aviation Safety and Service Quality And Cost- Institutional review and state IDA / D3850 Prior Open - International 550,000.00 0.00 Under Review 2021-03-24 2021-06-20 2021-03-31 2021-06-24 2021-05-14 2021-07-09 2021-08-08 2021-09-12 2021-10-24 2022-04-24 Provision Based Selection safety program Page 1 CARS3/CS/QCBS/05 / Aviation Safety and Service Quality And Cost- Pending Monitoring software for IDA / D3850 Post Open - International 400,000.00 0.00 2021-09-16 2021-09-30 2021-11-18 2021-12-16 2022-01-15 2022-02-19 2022-04-04 2022-10-01 Provision Based Selection Implementation airmen and aviation personnel CARS/3/CS/CQS/01 / Consultant Consulting Services for review Aviation Safety and Service Under IDA / D3850 Post Qualification Open - National 130,000.00 0.00 2021-04-30 2021-06-17 2021-05-21 2021-06-25 2021-07-04 2021-08-03 2021-09-24 2021-12-24 of education program and Provision Implementation Selection capacity building (KAI) CARS3/CS/QCBS/04 / Aviation Safety and Service Quality And Cost- IDA / D3850 Prior Open - International 400,000.00 0.00 Under Review 2021-04-30 2021-05-21 2021-07-04 2021-08-01 2021-08-31 2021-10-05 2021-11-01 2022-04-30 Drafting aviation rules Provision Based Selection CARS3/CS/QCBS/02 / Consulting Services for Sustainable Tourism Quality And Cost- sustainable tourism IDA / D3850 Development in Issyk-Kul Prior Open - International 1,500,000.00 0.00 Canceled 2019-10-01 2019-10-22 2019-12-05 2020-01-02 2020-02-01 2020-03-07 2020-04-11 2021-04-11 Based Selection development,geoparks, Oblast statistics satellites CARS3/CS/CQS/02 / Sustainable Tourism Consultant Consulting Services for design IDA / 63280 Development in Issyk-Kul Post Qualification Open - National 60,000.00 0.00 Canceled 2019-04-10 2020-12-10 2019-05-01 2019-06-14 2019-07-14 2019-08-18 2020-02-14 supervision for tourist centers Oblast Selection CARS3/CS/QCBS/02/1 / Consulting Services for Development of a Sustainable Tourism Strategy and Masterplan, including Sustainable Tourism Quality And Cost- Under preparation of two local IDA / D3850 Development in Issyk-Kul Prior Open - International 1,080,000.00 0.00 2021-04-06 2021-06-16 2021-04-27 2021-06-23 2021-06-10 2021-07-08 2021-08-07 2021-09-11 2021-10-16 2022-10-16 Based Selection Implementation development plans for Aksuu Oblast and Tyup districts (concept development of geoparks) in Issyk-Kul Oblast, as well as strategic environment CARS3/CS/CQS/02/1 / Sustainable Tourism Consultant Consulting Services for design Under IDA / 63280 Development in Issyk-Kul Post Qualification Open - National 70,000.00 0.00 2019-04-10 2021-06-21 2019-05-01 2019-06-14 2019-07-14 2019-08-18 2020-02-14 and author supervision for Implementation Oblast Selection tourist centers CARS3/CS/QCBS/06 / Consulting Services for the Sustainable Tourism Development and Pilot Quality And Cost- IDA / D3850 Development in Issyk-Kul Prior Open - International 420,000.00 0.00 Under Review 2021-05-10 2021-05-31 2021-07-14 2021-08-11 2021-09-10 2021-10-15 2021-11-19 2022-11-19 Application of Tourism Based Selection Oblast Satellite Account (TSA) for the Issyk-Kul Oblast INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARS3/CS/IC/01 / Sustainable Tourism Individual Consulting Services for Pending IDA / D3850 Development in Issyk-Kul Post Consultant Open 36,000.00 0.00 2021-10-15 2021-12-03 2021-12-24 2022-01-24 2022-07-23 construction supervision Implementation Oblast Selection tourist centers CARS3/CS/IC/02 / Consulting Services for Individual Aviation Safety and Service Pending technical supervision for IDA / D3850 Post Consultant Open 10,000.00 0.00 2021-04-30 2021-06-18 2021-07-02 2021-07-23 2022-01-19 Provision Implementation rehabilitation of current Selection buildings and facilities of KAI CARS3/CS/SSS/01 / Sustainable Tourism Consulting Services for author IDA / D3850 Development in Issyk-Kul Post Direct Selection Direct 10,000.00 0.00 Canceled 2019-04-15 2019-04-25 2019-06-29 2019-12-26 supervision for tourist centers Oblast Page 2 PROCUREMENT PLAN (Textual Part) Project information: P168119 – Improving Resilience and Emergency Response Project Project Implementation agency: General Inspectorate of the Romanian Police Date of the Procurement Plan: May 2019 Period covered by this Procurement Plan: May 2019 – December 2025 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. As part of project preparations and negotiations, it has been agreed that the Bank’s Standard Procurement Documents or other documents agreed with the Bank will be used for procurement with national market approach. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable . PROCUREMENT Romania : Improving Resilience and Emergency Response Project PLAN General Information Country: Romania Bank’s Approval Date of the Original Procurement Plan: 2021-01-06 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168119 GPN Date: Project Name: Improving Resilience and Emergency Response Project Loan / Credit No: IBRD / 89490 General Inspectorate of the Romanian Police Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RO-GIRP-234781-GO-RFB / 2 x Human biological sample processing workflow for Pending disaster victim identification Operational Readiness and Single Stage - One IBRD / 89490 Post Request for Bids Open - International 358,000.00 0.00 Implementati 2022-02-22 2022-02-27 2022-04-10 2022-05-10 2022-06-14 2022-12-11 by judicial genetic methods Public Awareness Envelope on (fully integrated system consisting of DNA extraction, DNA quantification steps) RO-GIRP-207437-GO-RFB / Pending Operational Readiness and Single Stage - One Specifically equipment for IBRD / 89490 Post Request for Bids Open - National 340,000.00 0.00 Implementati 2021-12-13 2021-12-18 2022-01-29 2022-02-28 2022-04-04 2022-10-01 Public Awareness Envelope disaster victims identification on RO-GIRP-221756-GO-RFQ / Pending Request for Single Stage - One Minor equipment for the IBRD / 89490 Project Management Post Open - National 2,500.00 0.00 Implementati 2021-08-14 2021-10-09 2021-11-08 Quotations Envelope office on Pending RO-GIRP-221753-GO-RFQ / Request for Single Stage - One IBRD / 89490 Project Management Post Open - National 55,000.00 0.00 Implementati 2021-11-13 2022-01-08 2022-05-08 Vehicles procurement Quotations Envelope on Pending RO-GIRP-207463-GO-RFQ / Request for Single Stage - One IBRD / 89490 Project Management Post Open - National 90,000.00 0.00 Implementati 2021-08-28 2021-10-23 2021-11-22 IT equipment procurement Quotations Envelope on Pending RO-GIRP-207453-GO-RFQ / Request for Single Stage - One IBRD / 89490 Project Management Post Open - National 15,000.00 0.00 Implementati 2021-08-21 2021-10-16 2021-11-15 Furniture procurement Quotations Envelope on RO-GIRP-207467-GO-RFQ / Pending Request for Single Stage - One Procurement of Office IBRD / 89490 Project Management Post Open - National 90,000.00 0.00 Implementati 2021-09-04 2021-10-30 2021-11-29 Quotations Envelope supplies on RO-GIRP-207446-GO-RFB / Pending High-performance video Operational Readiness and Single Stage - One IBRD / 89490 Post Request for Bids Open - International 350,000.00 0.00 Implementati 2021-12-20 2021-12-25 2022-02-05 2022-03-07 2022-04-11 2022-10-08 cameras FLIR and emission- Public Awareness Envelope on reception systems Pending RO-GIRP-207447-GO-RFQ / Operational Readiness and Request for Single Stage - One IBRD / 89490 Post Open - National 50,000.00 0.00 Implementati 2021-11-27 2022-01-22 2022-07-21 Mountain climbing kit Public Awareness Quotations Envelope on RO-GIRP-207444-GO-RFB / 2 x Human biological sample processing workflow for disaster victim identification Pending by judicial genetic Operational Readiness and Single Stage - One IBRD / 89490 Post Request for Bids Open - International 442,000.00 0.00 Implementati 2022-02-14 2022-02-19 2022-04-02 2022-05-02 2022-06-06 2022-12-03 methods(fully integrated Public Awareness Envelope on system consisting of PCR amplification/ PCR product/amplicons separation steps) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending RO-GIRP-207471-NC-RFQ / Request for Single Stage - One IBRD / 89490 Project Management Post Open - National 10,000.00 0.00 Implementati 2021-11-20 2022-01-15 2022-09-19 Written Translation Services Quotations Envelope on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Enhance the Resilience of RO-GIRP-207430-CS-CQS / Consultant selected Romanian Police Pending Selection of a firm to provide IBRD / 89490 Post Qualification Open - National 35,424.81 0.00 2021-12-17 2022-01-07 2022-02-20 2022-03-22 2022-04-26 2022-10-23 Infrastructure to be used in Implementation technical verification services Selection Disaster Response Consultant RO-GIRP-207452-CS-CQS / Operational Readiness and Pending IBRD / 89490 Post Qualification Open - National 100,000.00 0.00 2021-10-27 2021-11-17 2021-12-31 2022-01-30 2022-03-06 2022-09-02 Public information campaigns Public Awareness Implementation Selection Page 1 RO-GIRP-207432-CS-CQS / Technical Surveyors for Piatra Enhance the Resilience of Neamţ Municipal Police & Consultant selected Romanian Police Pending Traffic Police Service no. 14 / IBRD / 89490 Post Qualification Open - National 32,620.30 0.00 2022-01-28 2022-02-18 2022-04-03 2022-05-03 2022-06-07 2022-12-04 Infrastructure to be used in Implementation Vaslui Municipal Police/ Selection Disaster Response Râmnicu Sărat Municipal Police / Iași Municipal Police RO-GIRP-207431-CS-CQS / Technical Surveyors for Enhance the Resilience of Precinct no. 6, Bucharest / Consultant selected Romanian Police Pending Precinct no. 7, Bucharest / IBRD / 89490 Post Qualification Open - National 25,848.55 0.00 2022-01-14 2022-02-04 2022-03-20 2022-04-19 2022-05-24 2022-11-20 Infrastructure to be used in Implementation Precinct no. 13, Bucharest / Selection Disaster Response Ploiești Municipal Police / Precinct no. 3, Brașov RO-GIRP-207425-CS-CQS / Tendering for design and Enhance the Resilience of Consultant technical assistance for Public selected Romanian Police Pending IBRD / 89490 Post Qualification Open - National 319,670.40 0.00 2021-11-24 2021-12-01 2022-01-14 2022-02-13 2022-03-20 2022-09-16 Order and Traffic Police Infrastructure to be used in Implementation Selection Bucharest Operational Center Disaster Response Headquarters RO-GIRP-207429-CS-CQS / Tendering for design and technical assistance for Enhance the Resilience of Precinct no. 14, Bucharest / Consultant selected Romanian Police Pending Precinct no. 9, Bucharest / IBRD / 89490 Post Qualification Open - National 393,085.21 0.00 2021-08-19 2021-09-09 2021-10-23 2021-11-22 2021-12-27 2022-06-25 Infrastructure to be used in Implementation Precinct no. 3, Bucharest / Selection Disaster Response Precinct no. 18, Bucharest / Popești Leordeni Town Police / Pitești Municipal Police Consultant RO-GIRP-207451-CS-CQS / Operational Readiness and Pending IBRD / 89490 Post Qualification Open - National 20,000.00 0.00 2021-09-13 2021-10-04 2021-11-17 2021-12-17 2022-01-21 2022-07-20 Opinion poll Public Awareness Implementation Selection Consultant RO-GIRP-207472-CS-CQS / Pending IBRD / 89490 Project Management Post Qualification Open - National 20,000.00 0.00 2021-11-29 2021-12-20 2022-02-02 2022-03-04 2022-04-08 2022-05-08 External audit for year one Implementation Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RO-GIRP-221737-CS-INDV / Individual Under Externally contracted IBRD / 89490 Project Management Post Consultant Open 93,000.00 0.00 2021-07-19 2021-06-09 2021-09-06 2021-09-27 2021-11-01 2025-12-31 Implementation personnel - 1 x Secretary Selection RO-GIRP-221739-CS-INDV / Individual Under Externally contracted IBRD / 89490 Project Management Post Consultant Open 74,400.00 0.00 2021-07-19 2021-06-09 2021-09-06 2021-09-27 2021-11-01 2025-12-31 Implementation personnel - 1 x Driver Selection RO-GIRP-221748-CS-INDV / Individual Under Externally contracted IBRD / 89490 Project Management Post Consultant Open 128,000.00 0.00 2021-07-16 2021-06-09 2021-09-03 2021-09-24 2021-10-29 2025-12-31 Implementation personnel - 1 Architect Selection RO-GIRP-221740-CS-INDV / Individual Externally contracted Under IBRD / 89490 Project Management Post Consultant Open 256,000.00 0.00 2021-07-09 2021-06-09 2021-08-27 2021-09-17 2021-10-22 2025-12-31 personnel - 2 x Procurement Implementation Selection experts RO-GIRP-221746-CS-INDV / Individual Externally contracted Under IBRD / 89490 Project Management Post Consultant Open 128,000.00 0.00 2021-07-16 2021-06-09 2021-09-03 2021-09-24 2021-10-29 2025-12-31 personnel - 1 x Construction Implementation Selection Engineer RO-GIRP-221751-CS-INDV / Individual Externally contracted Under IBRD / 89490 Project Management Post Consultant Open 256,000.00 0.00 2021-07-23 2021-06-09 2021-09-10 2021-10-01 2021-11-05 2025-12-31 personnel - 2 x Engineer Implementation Selection (mechanical) RO-GIRP-221742-CS-INDV / Externally contracted Individual Under personnel - 2 x Safeguards IBRD / 89490 Project Management Post Consultant Open 248,000.00 0.00 2021-07-30 2021-06-09 2021-09-17 2021-10-08 2021-11-12 2025-12-31 Implementation experts (social and Selection environmental ) Page 2 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) July 9, 2010 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other July 9, 2010 methods July 9, 2010 PROCUREMENT India : Nagaland Health Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2018-07-31 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149340 GPN Date: Project Name: Nagaland Health Project Loan / Credit No: IDA / Q9420, IDA / 59270 Department of Health and Family Welfare, Govt. of Nagaland Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NHP/PP/2018/016 / Construction of deep burial pits and sharp pits for bio- medical waste management (PHC,SC). The bid consist of 3 lots. Single Stage - One 1,144,643.5 2019-09- IDA / 59270 Health system development Post Request for Bids Open - National 1,200,000.00 Signed 2018-10-05 2018-10-10 2018-10-10 2018-11-03 2018-11-09 2018-12-07 2018-12-09 2018-12-20 2019-01-07 2019-02-23 Lot Envelope 7 04 1:Kohima,Phek,Kiphire,Wokha Lot 2:Dimapur,Peren,Mon Lot 3:Mokokchung,Longleng,Tuen sang,Zunheboto NHP/PP/2018/020 / Infrastructural Improvement of 4 Schools of Nursing and 1 Paramedical Training Institute Single Stage - One 1,019,355.5 2019-09- IDA / 59270 Health system development Post Request for Bids Open - National 1,094,285.00 Signed 2018-10-09 2018-10-10 2018-10-10 2018-10-23 2018-11-26 2018-12-06 2018-12-26 2018-12-19 2019-01-30 2019-02-23 in Envelope 9 27 Kohimma,Dimapur,Mokokchu ng,Tuensang. The bid consist of 5 lots. NHP/PP/2018/019 / Infrastructural development of Single Stage - One 1,682,505.2 2019-11- IDA / 59270 Health system development Post Request for Bids Open - National 1,831,983.00 Signed 2018-12-11 2018-12-11 2018-12-12 2019-01-18 2019-01-18 2019-02-17 2019-04-02 2019-03-24 2019-05-31 8 district hospitals. The bid Envelope 0 19 consist of 8 lots NHP/PP/2018/022 / Construction of roof water harvesting, elevated water tank, underground or partially Single Stage - One 3,941,665.7 2019-12- underground tank, sanitation IDA / 59270 Health system development Post Request for Bids Open - National 5,241,225.71 Signed 2018-12-17 2018-12-11 2018-12-18 2019-02-01 2019-01-31 2019-03-03 2019-08-05 2019-04-07 2019-10-04 Envelope 7 03 and minor civil works in CHC,PHC & SC 165 health units. The bid consist of 11 lots. NHP/PP/2019/002 / Under Infrastructural Development in Single Stage - One 2020-07- IDA / 59270 Health system development Post Request for Bids Open - National 607,309.00 0.00 Implementat 2019-07-30 2019-09-05 2019-08-03 2019-09-05 2019-09-14 2019-10-14 2019-11-18 3 CHC, 8 PHC & 7 SC of Envelope 17 ion Kohima District. NHP/PP/2018/005 / INFRASTRUCTURE Single Stage - One 2020-04- IMPROVEMENT IN NAGA IDA / 59270 Health system development Post Request for Bids Open - National 927,812.16 0.00 Canceled 2019-11-20 2019-11-21 2019-11-21 2019-12-09 2020-01-20 2020-02-19 2020-03-25 Envelope 18 HOSPITAL AUTHORITY KOHIMA (NHAK), NAGALAND NHP/PP/2019/008 / Pending Construction of pre- Single Stage - One 2020-10- IDA / 59270 Health system development Post Request for Bids Open - National 185,414.00 0.00 Implementat 2019-10-20 2019-10-25 2019-12-06 2020-01-05 2020-02-09 fabricated State Warehouse at Envelope 06 ion Kohima (DHFW) NHP/PP/2018/012 / Construction of deep burial Pending Community action for health Request for Single Stage - One 2018-11- pits and sharp pits at Kohima IDA / 59270 Post Limited 12,307.69 0.00 Implementat 2018-09-18 2018-10-03 and nutrition Quotations Envelope 17 and Dimapur Municipal ion dumping site NHP/PP/2018/015 / Ground Pending leveling, foundation and Community action for health Request for Single Stage - One 2019-05- IDA / 59270 Post Limited 86,630.77 0.00 Implementat 2018-10-02 2018-11-10 retaining wall for construction and nutrition Quotations Envelope 09 ion of state warehouse NHP/PP/2020/001 / Procurement of firm for Pending Request for Single Stage - One 2021-06- renovation of Staff quarter to IDA / 59270 Health system development Post Limited 45,492.00 0.00 Implementat 2020-10-29 2020-12-20 Quotations Envelope 18 Nursing hostel at Nursing ion School at Dimapur NHP/PP/2021/004 / Re-bid for Infrastructural Pending Single Stage - One 2022-03- development at Naga Hospital IDA / 59270 Health system development Post Request for Bids Open - National 550,824.32 0.00 Implementat 2021-02-10 2021-02-15 2021-03-29 2021-04-28 2021-06-02 Envelope 30 Authority Kohima (NHAK) ion through E-procurement NHP/PP/2021/006 / Rebid for Infrastructural Pending Single Stage - One 2022-04- development in CHC, PHC & IDA / 59270 Health system development Post Request for Bids Open - National 741,756.76 0.00 Implementat 2021-02-10 2021-02-15 2021-03-29 2021-04-28 2021-06-02 Envelope 07 SC at Kohima District through ion E-procurement NHP/PP/2021/014 / Pending Infrastructural development at Single Stage - One 2022-07- IDA / 59270 Health system development Post Request for Bids Open - National 166,393.24 0.00 Implementat 2021-04-08 2021-04-13 2021-05-14 2021-06-13 2021-07-18 District Hospital Peren , Envelope 15 ion Nagaland NHP/PP/2021/016 / Construction of Library Block Pending Single Stage - One 2022-06- and Lecture threatre at IDA / 59270 Health system development Post Request for Bids Open - National 337,837.84 0.00 Implementat 2021-04-09 2021-04-12 2021-05-26 2021-06-25 2021-07-30 Envelope 30 Medical College Kohima ion through Eprocurement Page 1 NHP/PP/2021/017 / Construction of Oxygen Generation Plant House in Request for District Hospital through Quotations - Small Pending Request for Single Stage - One 2021-07- Shopping (RFQ) in order to IDA / 59270 Health system development Post Limited Works 26,777.70 0.00 Implementat 2021-04-27 2021-05-12 Quotations Envelope 31 house the oxygen generator (Emergency) SPD - ion plant which will be supplied Competitive by UNDP & UNICEF at remote Peren district of Nagaland NHP/PP/2021/018 / Construction of Oxygen Generation Plant House in Request for remote place of WOKHA Quotations - Small Pending Request for Single Stage - One 2021-07- District Hospital through IDA / 59270 Health system development Post Limited Works 27,975.00 0.00 Implementat 2021-04-25 2021-05-10 Quotations Envelope 31 Shopping (RFQ) in order to (Emergency) SPD - ion house the oxygen generator Competitive plant which will be supplied by UNDP & UNICEF. NHP/PP/2021/019 / Construction of Oxygen Generation Plant House in the Request for remote place of PHEK District Quotations - Small Pending Request for Single Stage - One 2021-07- Hospital through Shopping IDA / 59270 Health system development Post Limited Works 31,362.16 0.00 Implementat 2021-04-25 2021-05-10 Quotations Envelope 31 (RFQ) in order to house the (Emergency) SPD - ion oxygen generator plant which Competitive will be supplied by UNDP & UNICEF. NHP/PP/2021/020 / Construction of Oxygen Generation Plant House in Request for remote place of ZUNHEBOTO Quotations - Small Pending Request for Single Stage - One 2021-07- District Hospital through IDA / 59270 Health system development Post Limited Works 30,548.92 0.00 Implementat 2021-04-25 2021-05-10 Quotations Envelope 31 Shopping (RFQ) in order to (Emergency) SPD - ion house the oxygen generator Competitive plant which will be supplied by UNDP & UNICEF. NHP/PP/2021/021 / Construction of Oxygen Generation Plant House in Request for remote location of TUENSANG Quotations - Small Pending Request for Single Stage - One 2021-07- District Hospital through IDA / 59270 Health system development Post Limited Works 31,416.78 0.00 Implementat 2021-04-25 2021-05-10 Quotations Envelope 31 Shopping (RFQ) in order to (Emergency) SPD - ion house the oxygen generator Competitive plant which will be supplied by UNDP & UNICEF. NHP/PP/2021/022 / Construction of Oxygen Generation Plant House in Request for remote locate of MON District Quotations - Small Pending Request for Single Stage - One 2021-07- Hospital through Shopping IDA / 59270 Health system development Post Limited Works 26,363.24 0.00 Implementat 2021-04-25 2021-05-10 Quotations Envelope 31 (RFQ) in order to house the (Emergency) SPD - ion oxygen generator plant which Competitive will be supplied by UNDP & UNICEF NHP/PP/2021/023 / Construction of Oxygen Generation Plant House in Request for remote location of LONGLENG Quotations - Small Pending Request for Single Stage - One 2021-07- District Hospital through IDA / 59270 Health system development Post Limited Works 28,425.11 0.00 Implementat 2021-04-25 2021-05-10 Quotations Envelope 31 Shopping (RFQ) in order to (Emergency) SPD - ion house the oxygen generator Competitive plant which will be supplied by UNDP & UNICEF. NHP/PP/2021/024 / Construction of Oxygen Generation Plant House in Request for remote location of KIPHIRE Quotations - Small Pending Request for Single Stage - One 2021-06- District Hospital through IDA / 59270 Health system development Post Limited Works 33,735.27 0.00 Implementat 2021-04-20 2021-05-03 Quotations Envelope 30 Shopping (RFQ) in order to (Emergency) SPD - ion house the oxygen generator Competitive plant which will be supplied by UNDP & UNICEF. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NHP/PP/2018/013 / Bio medical waste management equipment & consumables (Autoclave,color coded bins,bags,Personnel protective equipment Single Stage - One (DH,CHC,PHC,SC).The bid IDA / 59270 Health system development Post Request for Bids Open - National 1,200,000.00 0.00 Canceled 2018-09-21 2018-10-10 2018-10-07 2018-11-03 2018-11-12 2018-12-02 2018-12-19 2019-03-19 Envelope consist 3lots: Lot1:Kohima,Kiphire,Phek,Wo kha Lot2:Dimapur,Peren,Mon Lot3:Mokokchung,Zunheboto, Tuensang,Longleng NHP/PP/2018/018 / Supply, erection, testing and commissioning of Solar PV Hybrid power plant, solar Single Stage - One IDA / 59270 Health system development Post Request for Bids Open - National 1,942,000.00 1,812,279.16 Signed 2018-12-11 2018-12-11 2018-12-12 2019-01-11 2019-01-11 2019-02-10 2019-03-04 2019-03-17 2019-03-18 2019-09-13 goods and electrical works on Envelope turnkey basis for 8 district hospitals. the bid consists of 8 lots. Page 2 NHP/PP/2018/021 / Supply, erection, testing and commissioning of solar PV Hybrid power plant, solar goods and electrical works on Single Stage - One IDA / 59270 Health system development Post Request for Bids Open - National 1,526,270.70 1,568,490.62 Signed 2018-12-17 2018-12-19 2018-12-21 2019-01-30 2019-02-12 2019-02-19 2019-04-22 2019-03-26 2019-07-08 2019-09-22 turnkey basis for CHC,PHC & Envelope SC Project Sites in Dimapur, Mokokchung and Wokha district. The bid consist of 3 lots. NHP/PP/2018/007 / SUPPLY AND INSTALLATION OF BIOMEDICAL WASTE Single Stage - One IDA / 59270 Health system development Post Request for Bids Open - National 377,142.86 494,700.36 Signed 2019-03-04 2019-03-07 2019-03-06 2019-04-06 2019-04-24 2019-05-06 2019-09-18 2019-06-10 2020-01-08 2019-10-08 EQUIPMENT- MICROWAVE Envelope STERILIZER FOR 11 DISTRICT HOSPITALS NHP/PP/2018/014 / SUPPLY AND INSTALLATION OF BIOMEDICAL WASTE EQUIPMENT- AUTOCLAVE IN NAGALAND. Autoclaves to be Single Stage - One installed at at 21 Community IDA / 59270 Health system development Post Request for Bids Open - National 627,142.86 5,897,703.95 Signed 2019-03-04 2019-03-07 2019-03-06 2019-04-06 2019-04-23 2019-05-06 2019-09-18 2019-06-10 2019-12-13 2019-11-07 Envelope Health Centre (CHC), 11 District TB Centre (DTC), 1 Mental Hospital (MTH), 2 TB Hospital, 96 Primary Health Centre & 90 Sub Centers NHP/PP/2018/017 / SUPPLY OF BIOMEDICAL WASTE MANAGEMENT PERSONNEL PROTECTIVE EQUIPMENT, COLOR CODED BINS & BAGS. Single Stage - One These items for 11 District IDA / 59270 Health system development Post Request for Bids Open - National 565,493.14 356,461.56 Signed 2019-03-04 2019-03-07 2019-03-06 2019-04-05 2019-04-25 2019-05-05 2019-09-18 2019-06-09 2019-11-16 2019-10-07 Envelope Hospital, 21 Community Health Centre, 11 TB Centre, 1 Mental Hospital, 2 TB Hospital, 135 Primary Health Centers, 399 Sub Centers NHP/PP/2019/005 / SUPPLY, ERECTION, TESTING AND COMMISSIONING OF SOLAR PV HYBRID POWER PLANT, SOLAR GOODS AND ELECTRICAL Under Single Stage - One WORKS ON TURNKEY BASIS IDA / 59270 Health system development Post Request for Bids Open - National 1,809,672.00 0.00 Implementati 2019-09-13 2019-09-03 2019-09-17 2019-09-18 2019-10-15 2019-10-16 2019-11-28 2020-02-05 2020-01-02 2020-06-30 Envelope FOR 4 DISTRICTs IN on NAGALAND (KIPHIRE; KOHIMA; PEREN; PHEK; DISTRICTS IN NAGALAND); This bid document consist of 4 Lots NHP/PP/2019/015 / SUPPLY, ERECTION, TESTING AND COMMISSIONING OF SOLAR PV HYBRID POWER PLANT, SOLAR GOODS AND ELECTRICAL Under WORKS ON TURNKEY BASIS Single Stage - One IDA / 59270 Health system development Post Request for Bids Open - National 1,697,020.41 0.00 Implementati 2019-11-14 2019-11-21 2019-11-19 2019-12-09 2020-01-06 2020-01-17 2020-02-05 2020-06-26 2020-03-11 2020-11-10 FOR 4 DISTRICTs IN Envelope on NAGALAND (LONGLENG; TEUNSANG; MON; ZUNEHBUTO; DISTRICTS IN NAGALAND); This bid document consist of 4 Lots NHP/PP/2019/010 / Supply and installation of CT Scan 32 Slice radiology medical Single Stage - One equipment under buy back of IDA / 59270 Health system development Post Request for Bids Open - National 680,397.89 0.00 Canceled 2019-11-19 2020-01-14 2020-07-12 Envelope existing 10 slice CT Scan for Naga hospital authority kohima (NHAK), Nagaland NHP/PP/2019/011 / Supply and installation of Digital X- Under Single Stage - One Ray medical equipment for IDA / 59270 Health system development Post Request for Bids Open - National 480,739.44 0.00 Implementati 2019-11-14 2019-11-21 2019-11-19 2019-12-09 2020-01-07 2020-01-24 2020-02-06 2020-03-12 2020-09-08 Envelope Naga hospital authority on kohima (NHAK), Nagaland NHP/PP/2019/012 / Supply and installation of (USG) Ultra Under Sound Color Doppler 3D / 4D Single Stage - One IDA / 59270 Health system development Post Request for Bids Open - National 169,014.08 0.00 Implementati 2019-11-14 2019-11-21 2019-11-19 2019-12-09 2020-01-08 2020-01-24 2020-02-07 2020-03-13 2020-07-11 medical equipment for Naga Envelope on hospital authority kohima (NHAK), Nagaland NHP/PP/2019/016 / Invitation for Quotations for Pending Request for Single Stage - One Supply of Laptops and IDA / 59270 Health system development Post Limited 10,000.00 0.00 Implementati 2020-03-09 2020-04-07 2020-05-07 Quotations Envelope desktops, Nagaland Health on Project NHP/PP/2020/003 / Procurement of Charts for Pending Request for Single Stage - One four Nursing School & one IDA / 59270 Health system development Post Limited 1,128.00 0.00 Implementati 2020-03-13 2020-04-17 2020-05-17 Quotations Envelope PMTI. These are anatomy on charts for class rooms NHP/PP/2020/004 / Pending Procurement of Nursing Lab Request for Single Stage - One IDA / 59270 Health system development Post Limited 47,825.00 0.00 Implementati 2020-03-13 2020-04-17 2020-05-17 Articles & Equipment for Quotations Envelope on Nursing School & PMTI. NHP/PP/2020/005 / Pending Procurement of IT Equipment Request for Single Stage - One IDA / 59270 Health system development Post Limited 51,265.00 0.00 Implementati 2020-03-13 2020-04-17 2020-05-31 for four Nursing School & one Quotations Envelope on PMTI NHP/PP/2020/006 / Procurement of RO Plant Pending Request for Single Stage - One (Providing & Installation) for IDA / 59270 Health system development Post Limited 20,329.00 0.00 Implementati 2020-03-13 2020-04-24 2020-07-23 Quotations Envelope four Nursing School & one on PMTI Page 3 NHP/PP/2018/024 / SUPPLY, ERECTION, TESTING AND COMMISSIONING OF SOLAR PV HYBRID POWER PLANT, SOLAR GOODS AND ELECTRICAL WORKS ON TURNKEY BASIS Single Stage - One IDA / 59270 Health system development Prior Request for Bids Open - National 3,552,173.91 0.00 Canceled 2019-05-01 2019-05-15 2019-06-14 2019-07-14 2019-08-18 2020-02-14 FOR 8 DISTRICT (CHC-14,PHC- Envelope 41,SC-58) IN NAGALAND(MON,KIPHIRE,KOH IMA,LONGLENG,PEREN,PHEK,T UENSANG,ZUNHEBHOTO). Bid has of 8 Lots. NHP/PP/2020/007 / Pending Procurement of Hepatitis B Request for Single Stage - One IDA / 59270 Health system development Post Open - National 11,333.00 0.00 Implementati 2020-04-20 2020-06-22 2020-09-20 vaccine , required 10000 Quotations Envelope on doses (Vial of 10 dose) NHP/PP/2020/009 / Procurement of Nine Tablet computers for Junior Engineers of NHP. These Pending Request for Single Stage - One Junior Engineers are placed at IDA / 59270 Health system development Post Open - National 1,440.00 0.00 Implementati 2020-04-20 2020-06-23 2020-07-23 Quotations Envelope district level and they will be on full time in field for contract management of ongoing Civil and Solar works. NHP/PP/2019/O10 / Supply and installation of CT Scan 32 Slice radiology medical Single Stage - One equipment under buy back of IDA / 59270 Health system development Post Request for Bids Open - National 680,397.89 0.00 Canceled 2019-12-16 2019-11-21 2019-12-21 2020-01-15 2020-01-13 2020-02-11 2020-02-12 2020-03-18 2020-09-14 Envelope existing 10 slice CT Scan for Naga hospital authority kohima (NHAK), Nagaland NHP/PP/2019/003 / SUPPLY AND INSTALLATION OF ICU Single Stage - One MEDICAL EQUIPMENT FOR IDA / 59270 Health system development Post Request for Bids Open - National 280,698.00 0.00 Canceled 2019-07-30 2019-09-05 2019-08-03 2019-09-05 2019-09-14 2019-10-24 2019-10-14 2019-11-18 2020-03-17 Envelope NAGA HOSPITAL AUTHORITY KOHIMA (NHAK), NAGALAND NHP/PP/2019/013 / Supply and installation of OT medical Single Stage - One equipment for Naga hospital IDA / 59270 Health system development Post Request for Bids Open - National 107,612.68 0.00 Canceled 2019-11-14 2019-11-21 2019-11-19 2019-12-09 2020-01-10 2020-02-11 2020-02-09 2020-03-15 2020-07-13 Envelope authority kohima (NHAK), Nagaland NHP/PP/2019/004 / Supply and Installation of portable and Mechanical ventilator Single Stage - One IDA / 59270 Health system development Post Request for Bids Open - National 123,336.00 0.00 Canceled 2019-07-30 2019-09-05 2019-08-02 2019-09-05 2019-09-13 2019-10-31 2019-10-13 2019-11-17 2020-03-16 medical equipment for Naga Envelope Hospital Authority Kohima (NHAK), Nagaland NHP/PP/2020/013 / procurement of 460 numbers of disinfectant sprayers for Pending Community action for health Request for Single Stage - One use in 460 health committee IDA / 59270 Post Open - National 25,334.00 0.00 Implementati 2020-05-26 2020-07-21 2020-08-20 and nutrition Quotations Envelope under NHP Project sites as a on preventive measures during this Covid-19 pandemic NHP/PP/2019/014 / Supply of Bio-Medical waste Bags. These bags shall be non- chlorinated, bio-degradable. These bags are for 11 District Request for Single Stage - One IDA / 59270 Health system development Post Open - National 98,591.55 0.00 Canceled 2019-11-19 2020-02-03 2020-06-02 Hospital, 21 Community Quotations Envelope Health Centre, 11 TB Centre, 1 Mental Hospital, 2 TB Hospital, 135 Primary Health Centers, 399 Sub Centers NHP/PP/2021/002 / To print IEC materials flip chart for ASHA & AWW which are easily assessable to them with Pending pictorial representation to Community action for health Request for Single Stage - One IDA / 59270 Post Limited 81,081.00 0.00 Implementati 2021-02-01 2021-03-29 2021-09-25 help in better understanding and nutrition Quotations Envelope on of the concept .To enhance community sensitization & ensure better Social Behavioral Change NHP/PP/2020/012 / Procurement of Bio-Medical Waste colored coded Bags: RED bags foot operated compatible for approx. 32 Pending Request for Single Stage - One liters Bins through GeM. IDA / 59270 Health system development Post Limited 57,432.43 0.00 Implementati 2021-01-29 2021-03-26 2021-09-22 Quotations Envelope Because the earlier on procurement through NCB with lot-wise package was a failure as no bidders participated in the bid. NHP/PP/2020/011 / To Procure Bio-Medical Waste colored coded Bags: BLUE & GREEN Bags for Municipal foot operated compatible approx. Pending Request for Single Stage - One 50 lts Bin through GeM IDA / 59270 Health system development Post Limited 87,837.83 0.00 Implementati 2021-01-29 2021-03-26 2021-09-22 Quotations Envelope .Because the earlier on procurement through NCB with lot-wise package was a failure as no bidders participated NHP/PP/2020/010 / Bio- Medical Waste colored coded Bags: YELLOW bags foot operated compatible for approx. 32 litres Bins to Pending Request for Single Stage - One procure through GeM, IDA / 59270 Health system development Post Limited 57,432.43 0.00 Implementati 2021-01-29 2021-03-26 2021-09-22 Quotations Envelope Because the earlier on procurement through NCB with lot-wise package was a failure as no bidders participated in the bid. Page 4 NHP/PP/2021/010 / Pending Request for Single Stage - One Furniture for Nursing Council IDA / 59270 Health system development Post Open - National 2,166.62 0.00 Implementati 2021-02-20 2021-03-20 2021-04-20 Quotations Envelope to procure through GeM on BOOKS FOR NURSING Pending SCHOOL & PMTI / Books for Request for Single Stage - One IDA / 59270 Health system development Post Open - National 19,966.50 0.00 Implementati 2021-02-22 2021-03-22 2021-04-20 Nursing School & PMTI to Quotations Envelope on procure through GeM NHP/PP/2021/005 / Re-bid for Supply, Erection, Testing and Commissioning of Solar Pending PV Hybrid Power Plant, Solar Single Stage - One IDA / 59270 Health system development Post Request for Bids Open - National 425,400.34 0.00 Implementati 2021-02-15 2021-02-21 2021-03-22 2021-04-30 2021-07-15 2022-06-30 Goods and Electrical Works on Envelope on Turnkey Basis for MON district in Nagaland through E- procurement NHP/PP/2021/003 / Supply and Installation of medical Pending equipment for Naga Hospital Request for Single Stage - One IDA / 59270 Health system development Post Open - National 86,351.35 0.00 Implementati 2021-02-24 2021-04-10 2021-05-11 Authority Kohima (NHAK), Quotations Envelope on Nagaland. - Package 02 for procurement in GeM NHP/PP/2021/001 / Supply and Installation of medical equipment for Naga Hospital Pending Authority Kohima (NHAK), Request for Single Stage - One IDA / 59270 Health system development Post Open - National 94,594.59 0.00 Implementati 2021-02-27 2021-04-05 2021-06-05 Nagaland to procure 14 Quotations Envelope on numbers of Advance cardiac monitor through GeM (Package 01) NHP/PP/2021/007 / Supply & Installation of medical equipment for NHAK to procure  35 numbers in total Pending of 12 channel ECG (2 nos), Request for Single Stage - One IDA / 59270 Health system development Post Open - National 94,554.05 0.00 Implementati 2021-02-27 2021-03-25 2021-05-27 Cardiac Defibrillator (2 nos) , Quotations Envelope on Advance cardiac monitor (11 nos), Syringe Pumps (10 nos), Volumetric pumps (10 nos) to procure Through GeM . NHP/PP/2021/012 / Bed Mattress with inner cushioning materials - Pending Request for Single Stage - One sandwiched rubberized coir IDA / 59270 Health system development Post Open - National 39,189.19 0.00 Implementati 2021-03-06 2021-03-30 2021-05-10 Quotations Envelope sheet for 4 (four) Nursing on schools in Nagaland of 326 nos to procure through GeM NHP/PP/2021/013 / Supply and installation of pallets, Pending Request for Single Stage - One forklift, furniture & interior IDA / 59270 Health system development Post Open - National 78,095.00 0.00 Implementati 2021-03-21 2021-04-30 2021-05-06 Quotations Envelope furnishing of State ware house on to procure through GeM NHP/PP/2021/015 / Solar Pending Single Stage - One and Electrical Works at District IDA / 59270 Health system development Post Request for Bids Open - National 124,324.32 0.00 Implementati 2021-04-20 2021-04-25 2021-06-06 2021-07-06 2021-08-10 2022-07-20 Envelope Hospital, Peren- Nagaland on NHP/PP/2021/025 / Supply and Installation of Oxygen Pipeline Connection at Pending Oxygen Generation Plant Request for Single Stage - One IDA / 59270 Health system development Post Limited 23,984.80 0.00 Implementati 2021-04-25 2021-05-12 2021-06-16 House in 3 district hospitals Quotations Envelope on (Peren, Wokha, Phek )through Shopping to meet urgent 2nd wave of Covid'19 emergency NHP/PP/2021/026 / Supply and Installation of Oxygen Pipeline Connection at Oxygen Generation Plant Pending House in 2 district hospitals ( Request for Single Stage - One IDA / 59270 Health system development Post Limited 15,989.86 0.00 Implementati 2021-04-27 2021-05-14 2021-07-31 Zunheboto, Tuensang) Quotations Envelope on through Shopping to meet urgent 2nd wave of Covid'19 emergency in remote location of the State NHP/PP/2021/027 / Supply and Installation of Oxygen Pipeline Connection at Oxygen Generation Plant Pending Request for Single Stage - One House in 3 district hospitals IDA / 59270 Health system development Post Limited 23,984.80 0.00 Implementati 2021-04-27 2021-05-13 2021-07-31 Quotations Envelope (Mon, Longleng, Kiphire) on through Shopping to meet urgent 2nd wave of Covid'19 emergency Pending NHP/PP/2021/028 / To IDA / 59270 Health system development Post Direct Selection Direct 35,891.22 0.00 Implementati 2021-04-22 2021-04-27 2021-05-02 2021-05-04 purchase vehicle for office use on NHP/PP/2021/029 / To Pending Procure emergency office IDA / 59270 Health system development Post Direct Selection Direct 6,356.08 0.00 Implementati 2021-04-22 2021-04-23 2021-04-27 2021-04-28 goods like Printer Toner, UPS on backup , etc for office use NHP/PP/2021/031 / To procure Oxygen Cylinders- Type D of 1200 numbers and Pending Request for Single Stage - One Type B of 800 numbers to IDA / 59270 Health system development Post Limited 318,918.92 0.00 Implementati 2021-05-08 2021-05-11 2021-05-31 Quotations Envelope address Covid emergency as on there is acute shortage of the item in the state Page 5 NHP/PP/2021/030 / oxygen concentrators 10 L of 600 units (model 7k-10) are very urgently required for the Pending State of Nagaland. Therefore IDA / 59270 Health system development Post Direct Selection Direct 690,620.00 0.00 Implementati 2021-05-28 2021-05-28 2021-05-29 2021-06-30 Project needs Bank assistance on to procure through BFP to get the items at the earliest possible time from any suppliers . NHP/PP/2021/038 / Installation of additional oxygen pipeline connection to remaining 4 (four) covid district hospitals of Pending Mokokchung, Dimapur, IDA / 59270 Health system development Post Direct Selection Direct 43,243.00 0.00 Implementati 2021-05-31 2021-06-01 2021-06-03 2021-07-06 Kohima and Noklak need on Direct Contract to firm who is presently installing the oxygen pipeline connections at covid hospitals NHP/PP/2021/039 / Laptops for newly recruit staff in State Project Management Unit (SPMU-Kohima) of 2 numbers Pending through off the shelf IDA / 59270 Health system development Post Direct Selection Direct 1,369.36 0.00 Implementati 2021-05-31 2021-06-03 2021-06-07 2021-07-30 procurement as due to on lockdown and movement restriction due to Covid crises, business are affected and items are not easily available NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NHP/PP/2021/037 / Logistic service through BFP is very urgently required by the Pending Project to import the oxygen IDA / 59270 Health system development Post Direct Selection Direct 132,831.00 0.00 Implementati 2021-05-28 2021-05-28 2021-06-19 2021-06-30 concentrators of 600 numbers on from China , which is to address covid emergency in the State of Nagaland CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1 / Consultancy Service for Community action for health Quality And Cost- Project Management IDA / Q9420 Prior Open - International 750,000.00 424,879.16 Signed 2016-12-14 2017-03-23 and nutrition Based Selection Consultant NHP/PP/2018/006 / Hiring an Agency to provide Consultancy & Associated services for State-wide Integrated Health Community action for health Quality And Cost- Management Information IDA / 59270 Prior Open - National 8,000,000.00 685,195.99 Under Review 2018-09-20 2018-10-29 2018-09-20 2018-10-31 2018-09-26 2018-11-14 2018-10-26 2019-01-17 2018-11-15 2019-03-01 2018-12-13 2019-05-12 2019-01-10 2019-06-24 2023-01-10 and nutrition Based Selection System in the Department of Health & Family Welfare, Government of Nagaland, Under Nagaland Health Project NHP/PP/2018/023 / Technical support for capacity Consultant building in General Nursing IDA / 59270 Health system development Post Qualification Open - National 300,000.00 242,237.10 Signed 2019-01-09 2018-12-20 2019-01-10 2019-01-09 2019-02-17 2020-02-20 2019-02-24 2019-05-15 2019-03-10 2019-05-15 2021-03-09 Midwifery and Paramedical Selection schools in Nagaland NHP/PP/2018/025 / Designing and Community action for health UN Agencies Under implementation of IT based IDA / 59270 Prior Direct 1,752,332.80 0.00 2019-08-26 2022-08-25 and nutrition (Direct) Implementation Health Supply Chain Management in Nagaland NHP/PP/2018/026 / Terms of Reference for hiring of firm Consultant to produce a documentary of IDA / 59270 Health system development Post Qualification Open - National 100,000.00 0.00 Canceled 2019-07-17 2019-08-23 2019-07-23 2019-09-05 2019-10-05 2019-11-09 2023-03-31 impact of Nagaland Health Selection Project activities in the state of Nagaland NHP/PP/2019/001 / Hiring of firm for Mid and End term Community action for health Quality And Cost- Under IDA / 59270 Post Open - National 434,783.00 494,186.14 2019-07-31 2019-08-26 2019-08-03 2019-09-18 2019-09-16 2019-10-16 2019-10-14 2019-11-20 2019-11-13 2019-12-06 2019-12-18 2019-12-11 2020-01-22 2020-01-08 2023-03-31 assessment of Nagaland and nutrition Based Selection Implementation Health Project NHP/PP/2018/O26 / TERMS OF REFERENCE FOR HIRING OF FIRM TO PRODUCE A VIDEO Consultant DOCUMENTARY ON IMPACT IDA / 59270 Health system development Post Qualification Open - National 100,000.00 83,402.82 Signed 2019-09-20 2019-08-25 2019-09-21 2019-11-04 2019-11-08 2019-12-04 2019-11-08 2020-01-03 2019-11-08 2023-03-31 OF NAGALAND HEALTH Selection PROJECT (NHP) ACTIVITIES IN THE STATE OF NAGALAND. NHP/PP/2019/009 / Hiring of Community action for health Fixed Budget Internal Auditor to audit IDA / 59270 Post Open - National 28,169.01 46,537.83 Signed 2019-11-14 2019-11-18 2019-11-19 2019-12-09 2019-12-24 2019-12-19 2020-01-14 2020-01-29 2020-01-21 2020-02-20 2020-01-31 2020-02-20 2020-02-12 2020-01-24 2022-02-11 and nutrition Selection Nagaland Health Project. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 6 NHP/PP/2019/007 / NHP ( the externally aided Project) Directorate of Health & Family Welfare, Government of Individual Nagaland invites eligible Under IDA / 59270 Health system development Post Consultant Open 91,928.00 0.00 2019-10-12 2019-10-05 2019-11-30 2019-12-21 2020-01-25 2020-07-23 individuals for contractual Implementation Selection engagement for the period of 6 (six) months or further extension subject to Project Recruitment NHP/PP/2019/006 / Recruitment of Individual consultants for NHP, Directorat of H&FW, Kohima, invites application from Individual Pending interested candidates for IDA / 59270 Health system development Post Consultant Open 192,857.14 0.00 2020-02-06 2020-03-26 2020-04-16 2020-05-21 2023-05-06 Implementation Contract Management Expert Selection (Civil Engineer)-1, Finance Assistant-2,Data Analyst- 2,Divisional Assistant-1,Field Demonstrator-7. Page 7 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: January 30, 2018 2. Date of General Procurement Notice: to published 3. Period covered by this procurement plan: The procurement period of project covered from January to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Tout marché de cout estimé égal Catégorie de marchés ou supérieur à : Travaux (incluant clé à main, Fourniture et Installation, et $5,000,000 les Partenariat Public - Privé - PPP) Biens, Système d’Information et de Services $1,500,000 autres que les Services intellectuels 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not applicable 4. Reference to (if any) Project Operational/Procurement Manual: Manuel de Procedures Administratives, Financieres Et Comptables issued by WAEMU 5. Any Other Special Procurement Arrangements: Not applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 January 30, 2018 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 0.0066 4 No Post of the RfQ (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Services Consultant $500,000 (Firmes) Consultant Individuel $200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 1.7 14 Post Individual of number consultan of ts contracts that will be let under other methods January 30, 2018 January 30, 2018 PROCUREMENT Western Africa : REGIONAL PROGRAM TO HARMONIZE AND MODERNIZE LIVING CONDITIONS SURVEYS PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-02-05 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153702 GPN Date: 2018-02-19 Project Name: REGIONAL PROGRAM TO HARMONIZE AND MODERNIZE LIVING CONDITIONS SURVEYS Loan / Credit No: IDA / D1120 N Executing Agency(ies): ational Institute of Statistics WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity building and survey GW-INS BISSAU-46518-GO- harmonization and Single Stage - One IDA / D1120 Post Request for Bids Open - National 543,682.00 0.00 Canceled 2018-01-29 2018-02-03 2018-03-17 2018-04-16 2018-05-21 2018-11-17 RFB / Location de véhicules modernization through data Envelope collection and dissemination Capacity building and survey GW-INS BISSAU-46522-GO- harmonization and Single Stage - One IDA / D1120 Post Request for Bids Open - National 14,545.00 15,400.72 Signed 2018-01-29 2019-02-13 2018-02-03 2018-03-17 2018-03-30 2018-04-16 2018-04-10 2018-05-21 2018-09-05 2018-11-17 RFB / Aquisition de GPS modernization through data Envelope collection and dissemination GW-INS BISSAU-46528-GO- Capacity building and survey RFB / Acquisition de matériels harmonization and Single Stage - One IDA / D1120 Post Request for Bids Open - National 117,165.00 114,114.39 Completed 2018-01-29 2017-12-22 2018-02-03 2018-03-17 2018-02-01 2018-04-16 2018-02-16 2018-05-21 2018-02-23 2018-11-17 2018-09-12 informatiques et de mobilier modernization through data Envelope de bureau collection and dissemination Capacity building and survey Pending INE-EHCVM2-I-2021 / Achat harmonization and Request for Single Stage - One IDA / D1120 Post Open - National 27,745.45 0.00 Implementati 2021-06-15 2021-08-10 2022-02-06 de materiels informatique. modernization through data Quotations Envelope on collection and dissemination NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity building and survey GW-INSBISSAU-46518-GO- harmonization and Request for Single Stage - One IDA / D1120 Post Open - National 543,682.00 275,986.44 Signed 2018-09-10 2018-11-05 2018-09-21 2019-05-04 RFB / Location des véhicules modernization through data Quotations Envelope collection and dissemination INE-EHCVM2-V-2021 / Capacity building and survey Location des voitures pour Pending harmonization and Request for Single Stage - One appuier les activitées de IDA / D1120 Post Open - National 556,227.27 0.00 Implementati 2021-06-10 2021-06-15 2021-07-27 2021-08-26 2021-09-30 2022-03-29 modernization through data Proposals Envelope collectte des données sur on collection and dissemination terrain. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PROCUREMENT PLAN Project information: India; Andhra Pradesh Health Systems Development Project- (P167581) Project Implementation agency: DEPARTMENT OF HEALTH, MEDICAL AND FAMILY WELFARE, GOVT. OF ANDHRA PRADESH Date of the Procurement Plan: May 31, 2021 Period covered by this Procurement Plan: 18 months [as updated regularly on STEP] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: National competition for the procurement of goods, works and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3 – 5.5 of Section V of the Regulations and the following provisions: (a) Only the model bidding documents agreed with the Bank (and as amended for time to time) shall be used for bidding. (b) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids. (c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises, or enterprises from any given state. (d) Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer). (e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project. (f) To improve efficiency and transparency of small value purchases in Bank financed projects, the Bank has agreed to allow use of Government e-Market place (GeM) as follows: (i) Use of GeM is allowed in lieu of shopping up to US$ 30,000 in catalogue mode; (ii) Use of GeM is allowed in lieu of shopping up to US$ 100,000, provided there are at least 3 suppliers for the item on GeM and the Purchaser uses RFQ (mini competition or bidding among suppliers) feature on GeM to discover the final price; (iii) In both above cases Borrowers will record their assessment on reasonableness of price; and (iv) GeM is not to be used in lieu of NCB. (g) No negotiations are conducted even with the lowest evaluated responsive bidders. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets Not Applicable Procurement of Second Hand Goods: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations. Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable Other Relevant Procurement Information. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. To avoid doubts, the Bank may conduct, at any time, Independent Procurement Reviews of all the contracts financed under the loan. Even for Post Review cases, the inputs of Bank on Technical Specifications / TORs will be obtained by project. PROCUREMENT India : Andhra Pradesh Health Systems Strengthening Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2021-05-31 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167581 GPN Date: Project Name: Andhra Pradesh Health Systems Strengthening Project Loan / Credit No: IBRD / 89450 Department of Health, Medical and Family Welfare, Govt. of Andhra Pradesh Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-DHMFW-237019-GO-DIR Pending Improve Responsiveness of / BFP - PROCUREMENT OF IBRD / 89450 Post Direct Selection Direct 3,908,000.00 0.00 Implementati 2021-05-30 2021-06-04 2021-07-09 2022-01-05 Public Health Services OXYGEN CONCENTRATORS on IN-DHMFW-239211-GO-DIR Pending Improve Responsiveness of / Procurment of Oxygen IBRD / 89450 Post Direct Selection Direct 455,000.00 0.00 Implementati 2021-06-16 2021-06-21 2021-07-26 2022-01-22 Public Health Services Concentrators - UNOPS on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-DHMFW-237024-NC-DIR / PROVISION OF FREIGHT Pending Improve Responsiveness of SERVICES INCLUDING IBRD / 89450 Post Direct Selection Direct 897,178.00 0.00 Implementati 2021-05-30 2021-06-04 2021-07-09 2022-01-05 Public Health Services TRANPSORTATION AND on INSURANCE CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PROCUREMENT PLAN (Textual Part) Project information: [Mozambique] [Sustainable Rural Economy Program] [P-174002] Project Implementation agency: [Ministério da Agricultura e Desenvolvimento Rural] Date of the Procurement Plan: [2021, 01 April] Period covered by this Procurement Plan: [18 months] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in “Regulamento de Contratação de Empreitada de Obras Públicas, Fornecimento de Bens e Prestação de Serviços ao Estado” of the Republic of Mozambique of March 8, 2016 (“the Regulation”), as per Decree No. 5/2016, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). NA Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; To be identified Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]: To be identified Other Relevant Procurement Information. NA PROCUREMENT Mozambique : Sustainable Rural Economy Program PLAN General Information Country: Mozambique Bank’s Approval Date of the Original Procurement Plan: 2021-04-29 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174002 GPN Date: Project Name: Sustainable Rural Economy Program Loan / Credit No: / MINISTRY OF LAND, ENVIRONMENT AND RURAL DEVELOPMENT - International Funds Management Unit Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01/PERS/CS/2021 / SREP Increasing productivity and Quality And Cost- Under Impact Evaluation Baseline / Post Open - International 500,000.00 0.00 2021-04-29 2021-04-29 2021-05-14 2021-05-05 2021-05-28 2021-07-12 2021-07-19 2021-08-10 2021-09-14 2022-03-13 market access Based Selection Implementation Survey INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual 02/PERS/IC/2021 / PIU's Increasing productivity and Under / Post Consultant Open 120,000.00 0.00 2021-07-01 2021-06-02 2021-08-19 2021-09-09 2021-10-14 2023-10-16 Niassa Province Coordinator market access Implementation Selection Individual 03/PERS/IC/2021 / PIU's Tete Increasing productivity and Under / Post Consultant Limited 120,000.00 0.00 2021-05-31 2021-06-02 2021-06-07 2021-06-28 2021-08-02 2023-10-23 Province Coordinator market access Implementation Selection Individual 06/PERS/IC/2021 / M&E Increasing productivity and Pending / Post Consultant Open 96,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 Specialist market access Implementation Selection 07/PERS/IC/2021 / Individual Increasing productivity and Under Technology Transfer Specialist / Post Consultant Open 96,000.00 0.00 2021-07-01 2021-06-02 2021-08-25 2021-09-15 2021-10-20 2023-10-23 market access Implementation for UMG Selection Individual 08/PERS/IC/2021 / Increasing productivity and Under / Post Consultant Open 96,000.00 0.00 2021-07-01 2021-06-02 2021-08-25 2021-09-15 2021-10-20 2023-10-23 Infrastructure Specialist market access Implementation Selection Individual 09/PERS/IC/2021 / Increasing productivity and Under / Post Consultant Open 36,000.00 0.00 2021-07-01 2021-06-02 2021-08-09 2021-08-30 2021-10-04 2023-10-23 Administrative Assistant 1 market access Implementation Selection Individual 10/PERS/IC/2021 / Increasing productivity and Under / Post Consultant Open 36,000.00 0.00 2021-07-01 2021-06-02 2021-08-09 2021-08-30 2021-10-04 2023-10-23 Administrative Assistant 2 market access Implementation Selection 11/PERS/IC/2021 / Individual Increasing productivity and Pending Safeguard and gender / Post Consultant Open 60,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 market access Implementation assistant/Nampula Province Selection 12/PERS/IC/2021 / Individual Increasing productivity and Pending Safeguard and gender / Post Consultant Open 60,000.00 0.00 2021-07-01 2021-08-09 2021-08-30 2021-10-04 2023-10-23 market access Implementation assistant 2/Niassa Province Selection 13/PERS/IC/2021 / Individual Increasing productivity and Pending Safeguard and gender / Post Consultant Open 60,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 market access Implementation assistant 3/ Zambezia Selection Province 14/PERS/IC/2021 / Individual Increasing productivity and Pending Safeguard and gender / Post Consultant Open 60,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 market access Implementation assistant 4/ Sofala Province Selection 15/PERS/IC/2021 / Individual Increasing productivity and Pending Safeguard and gender / Post Consultant Open 60,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-16 market access Implementation assistant 4/Tete Province Selection 16/PERS/IC/2021 / Individual Increasing productivity and Pending Safeguard and gender / Post Consultant Open 60,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 market access Implementation assistant 6/Manica Province Selection Page 1 Individual 17/PERS/IC/021 / Value Increasing productivity and Pending / Post Consultant Open 120,000.00 0.00 2021-07-01 2021-08-23 2021-09-13 2021-10-18 2023-10-23 Chain Specialist for MGU market access Implementation Selection Individual 18/PERS/IC/2021 / Business Increasing productivity and Under / Post Consultant Open 96,000.00 0.00 2021-07-01 2021-06-02 2021-08-25 2021-09-15 2021-10-20 2023-10-23 Development Specialist MGU market access Implementation Selection 19/PERS/IC/2021 / Individual Increasing productivity and Under Procurement Specialist for / Prior Consultant Open 96,000.00 0.00 2021-07-01 2021-06-17 2021-08-30 2021-09-20 2021-10-25 2023-10-23 market access Implementation MGU Selection Individual 20/PERS/IC/2021 / Portfolio Increasing productivity and Pending / Post Consultant Open 48,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 manager market access Implementation Selection Individual 21/PERS/IC/2021 / Financial Increasing productivity and Under / Post Consultant Open 48,000.00 0.00 2021-07-01 2021-06-02 2021-08-25 2021-09-15 2021-10-20 2023-10-23 analysts market access Implementation Selection Individual 22/PERS/IC/2021 / Provincial Increasing productivity and Pending / Post Consultant Open 48,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 MG Officer 1 market access Implementation Selection Individual 23/PERS/IC/2021 / Provincial Increasing productivity and Pending / Post Consultant Open 48,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 MG Officer 2 market access Implementation Selection Individual 24/PERS/IC/2021 / Provincial Increasing productivity and Pending / Post Consultant Open 48,000.00 0.00 2021-07-01 2021-08-25 2021-09-15 2021-10-20 2023-10-23 MG Officer 3 market access Implementation Selection Individual 25/PERS/IC/2021 / General Increasing productivity and Under / Post Consultant Open 144,000.00 0.00 2021-07-01 2021-06-02 2021-08-22 2021-09-12 2021-10-18 2023-10-17 Coordinator of PERS market access Implementation Selection Individual 26/PERS/IC/2021 / Increasing productivity and Pending / Post Consultant Open 96,000.00 0.00 2021-07-19 2021-09-06 2021-09-27 2021-11-01 2023-04-28 Accontant 1 of PERS market access Implementation Selection Individual 27/PERS/IC/2021 / Increasing productivity and Pending / Post Consultant Open 72,000.00 0.00 2021-07-13 2021-08-31 2021-09-21 2021-10-26 2023-10-30 Accountant 2 of PERS market access Implementation Selection Individual 28/PERS/IC/2021 / Gender Increasing productivity and Pending / Post Consultant Open 120,000.00 0.00 2021-07-14 2021-09-01 2021-09-22 2021-10-27 2023-10-31 Specialist market access Implementation Selection Individual 29/PERS/IC/2021 / Matching Increasing productivity and Pending / Post Consultant Open 96,000.00 0.00 2021-07-14 2021-09-01 2021-09-22 2021-10-27 2023-10-27 Grants Portfolio Manager market access Implementation Selection Individual 31/PERS/IC/2021 / Financial Increasing productivity and Pending / Post Consultant Open 90,000.00 0.00 2021-07-07 2021-08-25 2021-09-15 2021-10-20 2023-10-24 Specialist market access Implementation Selection Individual 32/PERS/IC/2021 / Audit Increasing productivity and Pending / Post Consultant Open 120,000.00 0.00 2021-07-07 2021-08-25 2021-09-15 2021-10-20 2023-10-16 Specialist market access Implementation Selection Individual 33/PERS/IC/2021 / Increasing productivity and Under / Prior Consultant Open 120,000.00 0.00 2021-07-07 2021-08-25 2021-09-15 2021-10-20 2023-10-17 Procurement Specialist market access Implementation Selection Page 2 FINAL GEWEL PROCUREMENT PLAN Date of this revision: May 26, 2016 Zambia Girls Education and Women’s Empowerment (GEWEL) Project. (Project ID No P151451) 1. General: The project development objective (PDO) is to support the Government of Zambia to increase access to livelihood support for women and access to secondary education for disadvantaged adolescent girls in extremely poor households in selected districts. The Project consists of the following three components: Component 1. Supporting Women's Livelihoods(US$36 million) The objective of this component is to provide them with access to opportunities that will increase the productivity of their livelihood activities and their economic empowerment. Component 2. : Keeping Girls in School (US$25.78 million) The objective of this component is to support adolescent girls in extremely poor households to access secondary education. Component 3. Institutional Strengthening and Systems Building (US$3.22 million) The main objectives of this component is to strengthen institutional capacity and build systems to increase efficiency and improve coordination of targeted programs. 2. Project ID No:P151451 3. Project Implementing Agencies: Component 1: Ministry of Community Development and Social Welfare (MCDSW) Component 2: Ministry of Education, Science Vocational Training and Early Education (MGE) Component 3: Ministry of Gender (MOG); and MCDSW 4. Bank’s approval Date of the Procurement Plan: April 10, 2015 5. Date of General Procurement Notice: April, 2014, revised August 13, 2015 6. Period covered by this Procurement Plan: September 2015 to February 2017 I. Goods and Works and Non-Consulting Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by IDA as stated in Appendix 1 to the Guidelines for Procurement: Table 1: Thresholds for Procurement Methods and Prior Review Goods, Works and Non Consultant Services Expendit Procurement Method Contract Value Contracts Subject to ure Threshold For use of Prior Review (US$) Category Method (US$) 1 1. Works ICB (Works/Supply & >=10,000,000 All contracts Installation) NCB >=200,000 - As in procurement <10,000,000 plan Shopping <200,000 None Direct Contracting All values All contracts 2. Goods ICB >=2,000,000 All contracts NCB >=100,000 <2,000,000 As in procurement plan Shopping <300,000 (motor None vehicles only) Shopping <100,000 000 (rest not None motor vehicles) Direct Contracting All values All contracts Procurement from All values None UNOPS Agency Note: Contracts with a cost estimate below US$300,000 for motor vehicles only may be procured on basis of Shopping procurement method 2. Prequalification. N/A 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines). N/A 4. Reference to (if any) Project Operational/Procurement Manual: The components will besides provisions of the Banks Guidelines for Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers, dated January 2011, revised April 2014 and the Banks Guidelines Procurement of Goods, works, and Non-Consulting Services under IDRD Loans and IDA Credits & Grants by World bank Borrowers, dated January 2011, revised April 2014 and will also make use of the additional information and guidance provided in Manual – Guidance for Procurement of Small Contracts; World Bank Africa Region Procurement February 2011, revised March 2014 and in the case of all contracts entered into using NCB based on use of National standard Bidding Documents, additional provisions of the attachments and standard clauses of the Bank’s Policy – Corrupt and Fraudulent Practices whose text may not be modified will be used in both the bidding documents and the ensuing contracts. 5. Any Other Special Procurement Arrangements. None 6. Procurement Packages with Methods and Time Schedule. Procurement of Good and Non Services Do Comme me nts Pre Expecte Packa sti Prior Expected Est Proc q d ge Plan/ c or Contract Descripti Amount Bid Actu Pr Post Signatur on in Metho (yes Openin Numb al ef Revie e US $ d / g er er w Date no) Date en ce 2 Component 1: Supporting Women's Livelihoods(Ministry of Community Development and Social Welfare) Printing of MCDS Plan NCB No No Post Feb April 2016 May teaching W/NCS/ 448,300 2016 require and 001 Actua to split learning l between materials MCDS Plan 1,255,000 NCB No No Prior Nov Feb 2016 Purchase W/NCS/ 2015 of motor 002 Actua vehicles l MCDS Plan Aug Aug 2016 550,000 Prior W/NCS/ Procure 2016 003 Actua ment l from UN Yes No Agenci Purchase es of motor (UNOP vehicles S) MCDS Plan NCB No No Post Nov Feb 2016 230,000 Purchase W/NCS/ 2015 of Motor 004 Actua Bikes l MCDS Plan Shoppi No No Post Nov Feb 2016 16,000 W/NCS/ ng 2015 Purchase 005 Actua of Bicycles l MCDS Plan Shoppi No No Post Nov Feb 2016 82,000 W/NCS/ ng 2015 006 Actua Purchase l of Boats Purchase MCDS Plan 100,000 Shoppi No No Post Mar Apr 2016 of Various W/NCS/ ng 2016 Office 007 Actua Furniture l and Equipment for H/Q and Districts Computers MCDS Plan March May 2016 Needed 281,300 Post , Laptops, W/NCS/ 2016 for the Scanners, 008 Actua SWL Printers, l NCB No No operatio Projectors, ns Cameras, UPS Launching Plan 535,000 Post April 2016 and Actua Equipment MCDS NCB No No l for W/NCS/ operation 009 3 of GRS Equipment MCDS Plan April June 2016 200,000 Post for ICT- W/NCS/ 2016 based 010 Actua NCB No No learning l tools Developm MCDS Plan 120,000 Post Jan 2016 June 2016 ent of W/NCS/ Actua software 011 l and database for real- time NCB No No registratio n of SWL beneficiari es and monitoring of activities. Sub Total Component 1; Goods and Non 3,817,600 Consultant Services Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education ) Purchase MGE/G/ Plan 60,000 Shoppi No No Post Jan 2016 Feb 2016 Hand of Laptops, 01 ng held Tablets Actua devices and l for the Routers Impleme ntation of the model to capture real-time informati on in the field. IT MGE/G/ Plan 100,000 Shoppi No No Post Jan 2016 March (includin Equipment 02 ng 2016 g Actua compute l rs and other IT equipme nt) Vehicles MGE/G/ Plan Shoppi Nov Jan 2016 250,000 No No Post for 03 ng 2015 selected 4 districts Actua l Component 2. Keeping Girls in School (Ministry of Community Development ) Procureme MCDS Plan Shoppi Nov Jan 2016 37,500 No No Post nt of W/NCS/ ng 2015 Project 001 Actua Vehicle l Sub Total Component 2; Goods and Non 447,500 Consultant Services Component 3 (a): Institutional Strengthening and Systems Building: (Ministry of Gender) Setting up MOG/G Plan Shoppi No No Post Jun 2016 July 2016 IT /01 100,000 ng infrastruct Actua ure for l M&E in MOG vehicle for MOG/G Plan 50,000 Shoppi No No Post Nov Jan 2016 training, /02 ng 2015 and M&E Actua l Purchase MOG/G Plan 40,000.00 Shoppi No No Post Jun, July, 2016 of IT /03 ng 2016 Equipment Actua (Laptop l Computer, Desk top Computers , LAN, Camera, Projector and other IT Equipment s Purchase MOG/0 Plan 3,000 Shoppi No No Post Jun, July, 2016 of Office 4 ng 2016 Furniture Actua l Sub Total Component 3 A- Goods and Non 193,000 Consultant Services Component 3 (b) Institutional Strengthening and Systems: (Ministry of Community Development and Social Welfare) IT MCDS Plan 400,000 NCB No No Post Aug Dec 2015 Infrastruct W/G/01 2016 ure for Actua informatio l n systems 5 for MCDSW business at various levels Hardware MCDS Plan 150,000 NCB No No Post Nov Jan 2017 and W/G/02 2016 Software Actua for unique l identificati on solution Procureme MCDS Plan 60,000 Shoppi No No Post May June 2016 nt of W/G/03 ng 2016 devices for Actua field and l identificati on of beneficiari es Purchase MCDS Plan 100,000 Shoppi No No Post May July 2016 Goods of office W/G/04 ng 2016 for the furniture Actua National and l Social equpment Protectio n Co- ordinatio n Unit Purchase MCDS Plan 150,000 Shoppi No No Post July July 2016 For of Motor W/G/05 ng 2016 National Vehicles Actua Co- for l dination, National M&E and Social MIS. Protection Co- ordination Unit Sub Total Component 3 (b) : Goods and Non 860,000 Consultant Services Procurement of Works Sub Component 1: Supporting Women's Livelihoods(Ministry of Community Development and Social Welfare) MCDS Plan Shoppi No No Post Oct Oct 2016 45,000.00 Office W/W/0 ng 2016 refurbish 01 Actual ment Sub Component 3(b): Institutional Strengthening and Systems: (Ministry of Community Development and Social Welfare) Support to MCDS Plan 70,000 Shoppi No No Post Aug Aug 2016 office W/G/02 ng 2016 6 refurbish Actual ment Component 3 a). Institutional Strengthening and Systems: (Ministry of Gender ) Partitionin MOG/ Plan 2,000 Shoppi No No Post Sep Sep 2016 g of the W/01 ng 2016 Foyer for Actual the Conferenc e Room Sub Total: Works 127,000 II. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Table 2: Thresholds for Consultants Selection Methods and Prior Review Contract Value Contracts Subject Expenditure Procurement Threshold for use of to Prior Review Category Method selection method (US$ millions) (US$) QCBS, QBS >=200,000 All contracts Consulting As in procurement CQS, LCS, QBS, FBS <200,000 Firms plan SSS All values All Contracts Individual Competitive selection >=100,000 All contracts Consultants IC Single Source (IC) All values All contracts Selection NOTE: Contracts selected on basis of CQS should not exceed US$200,000 equivalent. Note: Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Engineering and contract management contracts with cost estimates of less than US$300,000 may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. The procurement plan will indicate those contracts using CQS whose short lists by exception may not comprise entirely national firms. Terms of Reference (TOR) for all consultancy contracts as well as all single source selections, irrespective of the contract value, will be subject to prior review. Any Other Special Selection Arrangements: N/A 2. Consultancy Assignments with Selection Methods and Time 1 2 3 4 5 6 7 7 Expected Prior Plan Estimate proposal Selecti / Ref. / d submissio Description on Post Comments No. Actu Cost in n Method Revie al US$ /opening w Date Component 1: Supporting Women’s Livelihoods(Ministry of Community Development and Social Welfare) Adoption and Roll-out of SWL sub component 1(a) MCDSW/ Survey Plan March 937,500 C/001 Enumeration of 2016 SWL beneficiaries Actua QCBS Prior l MCDSW/ Information, Plan CQS 200,000 Post May 2016 C/002 education and communications Actua outreach at local l and national level Service provider to Plan 845,000 Jan 2016 MCDSW/ pay productivity Actua QCBS Prior C/003 grants to l beneficiaries Sub-component 1b – Building National Implementation and Monitoring Capacity MCDSW/ Plan 112,500 Prior April 2016 C/004 Hiring of SWL Actua Contract Duration IC manager l is 24 Months MCDSW/ Plan IC 97,500 Post April 2016 C/005 Hiring of SWL M&E Actua Contract Duration Specialist l is 24 Months 97,500 April 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/006 Contract Duration M&E Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 97,500 Post Nov 2015 C/007 Contract Duration ICT Specialist Actua is 24 Months l July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/008 Contract Duration ICT Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/009 Contract Duration Program Officer Actua is 24 Months 89,100 July 2016 l 8 MCDSW/ Plan IC 89,100 Post Nov 2015 C/010 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/011 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/012 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/013 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 97,200 Post April 2016 C/014 Program Contract Duration Actua Accountant is 24 Months l 97,200 April 2016 MCDSW/ Assistant Plan IC 77,760 Post Nov 2015 C/015 Accountant Contract Duration Actua is 24 Months l 77,760 July 2016 MCDSW/ Plan Notes: assignment QBS 1,300,000 Prior May 2016 C/016 will include Actua finalizing SWL l training curriculum, design of communications strategy for Consultancy to outreach support roll out and awareness raising implementation of and support for SWL implementation of SWL activities (Short list will comprise for profit and not for profit firms i.e. Private sector and NGOs hence use of QBS) MCDSW/ Design of and Plan CQS 90,000 Post Jan 2016 C/017 operational guidelines for Actua targeting and l identification of 9 SWL beneficiaries MCDSW/ Development of Plan CQS 120,000 Post Jan 2016 C/018 strategy and tools for SWL GRS, and Actua support to launch l and operate the GRS MCDSW/ Plan IC 60,000 Post June 2016 C/019 Strategy for harmonization of Actua MCDSW l empowerment/liveli hood programs MCDSW/ Plan January Implementation QCBS 200,000 Post C/020 2017 evaluation and Actua beneficiary l satisfaction survey MCDSW/ Plan QCBS 1,030,000 Prior June 2016 C/021 Impact evaluation data collection Actua l Sub Total Component 1; Consulting 5,702,06 Services 0 Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education ) Assessment for the Plan IC 45,000 Post Sept 2015 MGE/C/0 identification of 01 technological Actua innovations l MGE/C/0 Development of a Plan IC 50,000 Post Dec 2015 02 beneficiary awareness strategy Actua for Keeping Girls in l School MGE/C/0 Design of Plan QCBS 200,000 Prior Jan 2016 03 Complaints & Grievance Mechanism for the Actua Keeping Girls in l School Initiative MGE/C/0 Plan CQS 60,000 Post Sept 2016 04 Actua TA to harmonize existing bursary l and assessment, strategy MGE/C/0 Support to Plan CQS 51,000 Post March 05 implement the 2017 action plan to harmonize existing 10 secondary school Actua support schemes l MGE/C/0 Information System Plan QCBS 500,000 Prior February 06 Module, 2016 Development of the software to capture real time information in the field and testing of Real time Data Sub Total Component 2: Consulting Actual 906,000 Services Component 3 (a). Institutional Strengthening and Systems Building: (Ministry of Gender) MOG/C/ Development of a Plan CQS 50,000 Post Oct 2015 01 monitoring Actua framework l MOG/C/ Development of Plan CQS 100,000 Post Jun 2016 02 software for a M&E Actua and evaluation l system MOG/C/ Technical Plan CQS /IC 100,000 Post Sept 2015 Various over the 03 assistance to the life of the project. National Secretariat Actua Activity may be for project l split when defined management Sub Total Component 3(a): 250,000 Consulting Services Component 3 (b). Institutional Strengthening and Systems Building: (Ministry of Community Development and Social Welfare MCDS Development of M&E Plan CQS 150,000 Prior Aug 2015 W/C/01 framework Actua l MCDS Development of a Plan QCBS 350,000 Prior July 2016 W/C/02 MIS module for SWL and non formal Actua Literacy l MCDS Enhancement of Plan CQS 150,000 Prior Jan 2017 W/C/03 MIS/SRB Actua l MCDS Update the training Plan IC 20,000 Post March W/C/04 strategy for MCDSW 2016 staff in M&E and Actua develop a strategy l 11 for capacity development in policy analysis MCDS Updating Operations Plan CQS 100,000 Post Dec 2015 W/C/05 Manuals Actua l MCDS Assessment of Actua CQS 100,000 Post Jul 2016 W/C/06 options to l identifying Plan beneficiaries of NRCs, MCDS Inventory of existing Plan CQS 40,000 Jan 2016 W/C/07 complimentary Post activities Actua l MCDS Software design and Actua CQS 150,000 Feb March W/C/08 implementation l Post Plan MCDS TA to National Plan IC 40,000 Post Oct 2016 W/C/10 Social Protection Co- Various TA Actua ordination Unit, l MCDS Development of a Plan IC 15,000 Post Jan 2016 W/C/9 strategy for good Actua practice l Sub Total Component 3 (b): 1,115,00 Consulting Services 0 III. Training, workshops and consultations Estimated Ref. Training, workshop Estimated Expected Duration No. and study tours Cost (US$) Training/workshop (Days) Component 1: Supporting Women’s Livelihoods(Ministry of Community Development and Social We Sub-component 1a – Adoption and Roll-out of SWL MCDSW/T/01 Training of Trainers (ToT) 2,416,000 Recurrent (July 2016; Ju workshop 2017; July 2018) MCDSW/T/02 1,172,000 Recurrent (July-Feb 201 Training of beneficiaries in life, July-Feb 2017/8; July-Fe business and savings 2018/9) 12 MCDSW/T/03 Training of beneficiaries in agri- 186,000 Recurrent (Sept-Feb 20 business and other sector- Sept-Feb 2017/8; Sept-F specific topics 2018/9) MCDSW/T/04 Recurrent (September 2 Provision of safe space for September 2017; Septe training and follow-up meetings 375,000 2018) MCDSW/T/05 Launching and operation of GRS 735,000 Recurrent MCDSW/T/06 Launching and operation of ICT- Recurrent (August 2016 based learning tools 325,000 August 2017, August 20 MCDSW/T/07 Launching and Equipment for operation of GRS 100,000 MCDSW/T/08 Launching and operation of ICT- based learning tools 125,000 Sub-component 1b – Building National Implementation and Monitoring Capacity MCDSW/T/009 Workshop for preparation of the March 2016 Operations Manual 20,000 MCDSW/T/010 Training of DCD staff on POM Recurrent and training curriculum 60,000 MCDSW/T/11 Training of DCD staff on Recurrent (August 2016 beneficiary enumeration and August 2017; August 20 registration 50,000 MCDSW/T/12 Training of DCD staff on Recurrent (August 2016 monitoring and reporting 50,000 August 2017; August 20 MCDSW/T/13 Recurrent (March 2017; Annual review 30,000 2018; March 2019) MCDSW/T/14 Training of HQ and district staff Recurrent (April-August training prior to SWL activities 270,000 2017, 2018) MCDSW/T/15 Study tours to learn from international experience in the implementation of livelihood support programs 100,000 MCDSW/T/16 Capacity Building of SWL Staff in January 2017 Bank Procurement and regulations and implementation 150,000 Institutional Strengthening and Systems Building MCDSW/T/14 South-south exchange on social 35,000 May 2016 protection policy and implementation issues. Sub Total Training , Workshops and Capacity 6,199,000 Building Component 1 Supporting Women’s Livelihoods(Ministry of Community Development and Social Welfare Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education) Sub-component 2b - System Strengthening and Consolidation Training Plan for MGE to implement the Keeping Girls in MGE /T/01 School initiative 40,000 March 2016 to May 201 13 MGE /T/02 Training of staff as per the training plan 135,000 Feb 2017 MGE /T/03 Training of the primary users of the Keeping Girls in School Information System Module 25,000 Dec 2015 MGE /T/04 Workshops and consultations for the action plan. 20,000 Feb 2017 MGE /T/05 South-south exchange on Keeping Girls in School initiative. 70,000 Dec 2016 MGE /T/06 Sharing of lessons learned between district officers 124,000 June 2016 – Sept 2020 Sub Total Training , Workshops and Capacity 414,000 Building Component 2 Subcomponent 2c: - System Strengthening for MCDSW to support Keeping Girls in School Initiativ MCDSW/T/15 Trainers of Trainers 100,000 November 2015 workshop for District Social Welfare Officers to train officers in the implementation of the Project MCDSW/T/16 Awareness raising and 25,000 November – December sensitization of Community onwards Welfare Assistance Committees (CWACs) MCDSW/T/17 Conduct inception visits to 65,000 December 2015 respective Districts and communities for programme buy-in particularly from traditional leaders, District Government officials and other stake holders. MCDSW/T/18 Hold a workshop to develop 10,000 November 2015 protocols for the implementation of the programme MCDSW/T/19 Verification of Girls on the 70,000 December 2015 list (Headcount) both in communities and villages. MCDSW/T/20 Quality Assurance, 130,000 March 2016 onwards Monitoring and mentoring of girls in school MCDSW/T/21 Follow up on girls in school 100,000 January 2016 by the CWACs, Districts, Provincial offices and Headquarters. MCDSW/T/22 Monitoring and supervision 171,250 March 2016 of follow up outcomes by the districts, provincial offices and Headquarters 14 MCDSW/T/23 Hold community validation 71,250 December 2015 meetings to provide feedback on enlisted girls Sub Total Subcomponent 2c 742,500 System Strengthening for MCDSW to support Keeping Girls in School Initiative Component 3 a). Institutional Strengthening and Systems: (Ministry of Gender ) MOG /T/01 Training of the primary users 50,000 Sept 2016 – March 2 of the monitoring and evaluation system in MOG MOG /T/02 Competency-based training 70,000 in co-ordination skills, gender analysis and gender mainstreaming June 2016 – Dec 20 MOG /T/03 Learning exchange on 70,000 empowerment programs March 2016 – May 2 MOG /T/04 Short-course local training of 4,000 staff in Project Management- 4 Staff Jan 2016 – June 20 MOG /T/05 Regional staff training in 28,000 impact evaluation • Master of Arts in Economic Policy Management – 2 Staff • Advanced M & E; Integrating Planning, Implementation, Budgeting, M&E-2 Staff • Project Management – 3 Staff Jan 2016 – Dec 20 MOG /T/06 Training of at least 10 65,000 district gender sub- committees per province in all 10 provinces in national provincial centres Jan 2016- Dec 201 MOG/T/07 Competency-based training 20,000 in Women Economic Entrepreneurship skills Nov - Dec 2016 Sub Total Training , Workshops and Capacity 327,000 Building Component 3(a) Component 3 a). Institutional Strengthening and Systems: (Ministry of Community Development ) MCDSW/T/01 Training and support for 90,000 Jun 2016 – Dec 2019 capacity development in line with training strategy for senior, middle-level and operational staff in MCDSW 15 MCDSW/T/02 Training of the primary users 10,000 May 2017 – Aug 2017 of the unique identification solution Sub Total Training , Workshops and Capacity Building Component 3(a) 100,000 GENERAL NOTES 1. Training and capacity building: The institutions charged with implementation responsibility for the componentswill identify the total cost of required training and prepare and submit to the Bank, for its prior review, a detailed training program. The training program will, inter alia, identify: (i) the training envisaged; (ii) the justification for the training, how it will lead to effective performance and implementation of the project (iii) the personnel to be trained; (iv) the selection methods of institutions or individuals conducting such training; (v) the institutions which will conduct training, if already selected; (vi) the duration of proposed training; and (vii) the cost estimate or specified cost of the training. Preparation and submission of a report, including to the Bank by the trainee upon completion of training would be mandatory. 2. Operating costs: For this project, the Bank has agreed with the implementing agencies of the various components that the procurement methods for works, goods and non-consulting services as described in the Procurement Guidelines do not have to be followed for payments made for operating costs arising from the implementation of the project. Instead, the Bank has assessed the Governments and other implementing agency own procurement and administrative procedures for these expenditures (during appraisal) and agrees that these procedures are adequate for procuring items for operating costs. The operating costs constitute recurrent costs (excluding purchase of motor vehicles, computers etc.) and typically include equipment rental and maintenance, vehicle operating costs, maintenance and repair, office rental and maintenance, office materials and supplies, utility costs (including electricity, water and gas) communications (including telephone and internet charges) equipment rent, operation and maintenance and cost of banking services (bank charges), travel cost and transport of the staff associated with project implementation. The Project Appraisal Document (PAD) and the Financing Agreement (FA) will include a list of the eligible items to be covered under the project. These items will be procured using the implementing Government agency’s administrative procedures, which have been reviewed and found acceptable to the Bank. Contracts for these items should not be included in the procurement plan. 16 PROCUREMENT Zambia : Girls Education and Womens Empowerment and Livelihood Project PLAN General Information Country: Zambia Bank’s Approval Date of the Original Procurement Plan: 2016-11-18 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151451 GPN Date: Project Name: Girls Education and Womens Empowerment and Livelihood Project Loan / Credit No: IDA / 56580, IDA / 65690 Ministry of Community Development and Social Welfare Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Pending MCDSW/W/002 / Support to Supporting Women's Request for Single Stage - One 2017-07- IDA / 56580 Post Open - National 70,000.00 0.00 Implementat 2016-08-20 2017-01-20 Office Refurbishment Livelihoods Quotations Envelope 19 ion Pending MCDSW/W/001 / Office Supporting Women's Request for Single Stage - One 2017-06- IDA / 56580 Post Open - National 45,000.00 0.00 Implementat 2016-10-14 2016-12-09 Refurbishment Livelihoods Quotations Envelope 07 ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending MCDSW/NCS/005 / Purchase Supporting Women's Request for Single Stage - One IDA / 56580 Post Open - National 16,000.00 0.00 Implementati 2016-11-21 2017-01-16 2017-07-15 of Bicyles Livelihoods Quotations Envelope on Pending MCDSW/NCS/006 / Purchase Supporting Women's Request for Single Stage - One IDA / 56580 Post Open - National 41,000.00 0.00 Implementati 2015-11-12 2016-01-07 2016-07-05 of Boats Livelihoods Quotations Envelope on MCDSW/NCS/007 / Purchase Pending of various office furniture and Supporting Women's Request for Single Stage - One IDA / 56580 Post Open - National 100,000.00 0.00 Implementati 2016-03-14 2016-05-09 2016-11-05 equipment for HQ and Livelihoods Quotations Envelope on Districts MCDSW/NCS/009 / Supporting Women's Single Stage - One Launching and Equipment for IDA / 56580 Post Request for Bids Open - National 535,000.00 0.00 Canceled 2016-04-04 2016-04-09 2016-05-21 2016-06-20 2016-12-07 2017-06-05 Livelihoods Envelope Operation of GRS MCDSW/NCS/010 / Pending Supporting Women's Single Stage - One Equipment for ICT based IDA / 56580 Post Request for Bids Open - National 200,000.00 0.00 Implementati 2017-01-25 2017-01-30 2017-03-13 2017-04-12 2017-05-17 2017-11-13 Livelihoods Envelope learning tools on MCDSW/NCS/011 / Development of software and database for real-time Supporting Women's Single Stage - One IDA / 56580 Post Request for Bids Open - National 120,000.00 0.00 Canceled 2017-06-05 2017-06-10 2017-07-22 2017-08-21 2017-09-25 2018-03-24 registration of SWL Livelihoods Envelope beneficiaries and monitoring of activities MCDSW/G/01 / IT Infrastructure for Information Supporting Women's Single Stage - Two IDA / 56580 Post Request for Bids Open - National 400,000.00 0.00 Canceled 2015-12-09 2015-12-14 2016-01-25 2016-04-08 2016-05-13 2016-11-09 system for MCDSW business Livelihoods Envelope at various levels MCDSW/G/02 / Hardware Supporting Women's Single Stage - One and Software for unique IDA / 56580 Post Request for Bids Open - National 150,000.00 0.00 Canceled 2017-01-03 2017-01-08 2017-02-19 2017-03-21 2017-04-25 2017-10-22 Livelihoods Envelope identification solution MCDSW/G/03 / Procurement Pending Supporting Women's Request for Single Stage - One of devices for field and IDA / 56580 Post Open - National 60,000.00 0.00 Implementati 2016-05-14 2016-07-09 2017-01-05 Livelihoods Quotations Envelope identification of beneficiaries on MCDSW/G/04 / Purchase of Pending Supporting Women's Request for Single Stage - One Office furniture and IDA / 56580 Post Open - National 100,000.00 0.00 Implementati 2016-07-13 2016-09-07 2017-03-06 Livelihoods Quotations Envelope equipment on MCDSW/G/05 / Purchase of Pending Motor Vehicles for National Supporting Women's Request for Single Stage - One IDA / 56580 Post Open - National 150,000.00 0.00 Implementati 2016-07-20 2016-09-14 2017-03-13 Social Protection Co- Livelihoods Quotations Envelope on ordination Unit Pending MCDSW/NCS/004 / Purchase Supporting Women's Single Stage - One IDA / 56580 Post Request for Bids Open - National 230,000.00 0.00 Implementati 2016-04-15 2016-04-20 2016-06-01 2016-07-01 2016-12-07 2017-06-05 of Motor Bikes Livelihoods Envelope on MCDSW/NCS/008 / Purchase of Pending Supporting Women's Single Stage - One Computers,Laptops,Scanners, IDA / 56580 Post Request for Bids Open - National 281,300.00 0.00 Implementati 2016-07-09 2016-07-14 2016-08-25 2016-09-24 2016-12-07 2017-06-05 Livelihoods Envelope Printers,Projectors,Cameras,U on PS Pending MCDSW/NCS/002 / Purchase Supporting Women's Single Stage - One IDA / 56580 Post Request for Bids Open - National 1,255,000.00 0.00 Implementati 2016-04-14 2016-04-19 2016-05-31 2016-06-30 2016-12-06 2017-06-04 of Motor Vehicles Livelihoods Envelope on Pending MCDSW/NCS/003 / Purchase Supporting Women's UN Agencies IDA / 56580 Post Direct 300,000.00 0.00 Implementati 2016-11-15 2016-11-15 2016-11-15 2016-11-15 of Motor Vehicles Livelihoods (Direct) on MCDSS/NCS/004 / Pending Supporting Women's Single Stage - One Procurement of Mobile Phones IDA / 56580 Post Request for Bids Open - National 180,000.00 0.00 Implementati 2017-07-22 2017-07-27 2017-08-24 2017-08-31 2017-09-21 2018-03-20 Livelihoods Envelope for SWL beneficiaries on MCDSS/NCS/18 / Supporting Women's Request for Single Stage - One Procurement of T Shirts for IDA / 56580 Post Limited 9,000.00 0.00 Canceled 2017-11-29 2018-01-24 2018-07-23 Livelihoods Quotations Envelope CBVs Page 1 MCDSS/NCS/020/17 / Supporting Women's Request for Single Stage - One Procurement of Gum Boots for IDA / 56580 Post Limited 3,000.00 7,736.57 Completed 2017-11-29 2017-11-17 2018-01-24 2018-01-03 2018-07-23 2018-01-08 Livelihoods Quotations Envelope Community Based Volunteers MCDSS/NCS/022/17 / Supporting Women's Request for Single Stage - One Procurement of Helmets for IDA / 56580 Post Limited 16,000.00 15,670.96 Completed 2017-11-29 2017-12-14 2018-01-24 2018-02-26 2018-07-23 2018-03-07 Livelihoods Quotations Envelope motorcycles MCDSS/NCS/023/17 / Supporting Women's Request for Single Stage - One Procurement of Rain Coats for IDA / 56580 Post Limited 12,000.00 23,326.35 Completed 2017-11-29 2017-12-01 2018-01-24 2017-12-27 2018-07-23 2018-01-12 Livelihoods Quotations Envelope Community Based Volunteers MCDSS/NCS/024/17 / Supporting Women's Request for Single Stage - One Procurement of Umbrellas for IDA / 56580 Post Limited 18,000.00 23,326.35 Completed 2017-11-29 2017-10-25 2018-01-24 2017-11-30 2018-07-23 2018-01-05 Livelihoods Quotations Envelope CBVs MCDSS/NCS/025/17 / Supporting Women's Request for Single Stage - One Procurement of two small IDA / 56580 Post Limited 75,000.00 0.00 Canceled 2017-12-06 2018-01-31 2018-07-30 Livelihoods Quotations Envelope boats for Lunga MCDSS/NCS/027/17 / Procurement of Executive T Supporting Women's Request for Single Stage - One Shirts and Shirts for SWL and IDA / 56580 Post Limited 7,500.00 4,137.08 Completed 2017-12-06 2017-11-27 2018-01-31 2017-12-27 2018-07-30 2018-02-13 Livelihoods Quotations Envelope DPI staff and Pop up banner for SRB official Launch MCDSS/NCS/028/17 / Procurement of Vehicle Supporting Women's Request for Single Stage - One Carriers, Bull Bars for DPI and IDA / 56580 Post Limited 10,000.00 0.00 Canceled 2017-12-06 2018-01-31 2018-07-30 Livelihoods Quotations Envelope Canopies for SWL Project Vehicle MCDSS/NCS/029/17 / Pending Institutional Strengthening Request for Single Stage - One Procurement of three motor IDA / 56580 Post Limited 150,000.00 0.00 Implementati 2017-12-06 2018-01-31 2018-07-30 and Systems Building Quotations Envelope vehicles for ISSB on MCDSS/NCS/030 / Procurement of Internet Institutional Strengthening Request for Single Stage - One IDA / 56580 Post Limited 8,000.00 0.00 Canceled 2017-12-06 2018-01-31 2018-07-30 Accessories for Phase 1 and Systems Building Quotations Envelope Districts for DPI MCDSS/NCS/031/17 / Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 1,200.00 0.00 Canceled 2017-12-06 2018-01-31 2018-07-30 Procurement of Life Jackets Livelihoods Quotations Envelope MCDSS/NCS/032 / Procurement of Computer Laptops and Printers for Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 8,200.00 7,728.07 Completed 2017-11-29 2017-11-30 2018-01-24 2018-02-19 2018-07-23 2018-01-12 Procurement Specialist, Livelihoods Quotations Envelope Logistics Officer and Project Officer MCDSS/NCS/034 / Supporting Women's Request for Single Stage - One Procurement of bicycles for IDA / 56580 Post Limited 9,500.00 8,769.19 Completed 2017-12-06 2017-11-14 2018-01-31 2017-12-18 2018-07-30 2018-01-12 Livelihoods Quotations Envelope CDAs MCDSS/NCS/36/17 / Supporting Women's Request for Single Stage - One Procurement of an 82 IDA / 56580 Post Limited 42,000.00 0.00 Canceled 2017-12-06 2018-01-31 2018-07-30 Livelihoods Quotations Envelope Computer Tablets MCDSS/NCS/37/17 / Institutional Strengthening Request for Single Stage - One Procurement of ten computers IDA / 56580 Post Limited 14,000.00 0.00 Canceled 2017-12-06 2018-01-31 2018-07-30 and Systems Building Quotations Envelope and two printers MCDSS/NCS/38/17 / Pending Supporting Women's Request for Single Stage - One Procurement of Mobile Phones IDA / 56580 Post Limited 7,000.00 0.00 Implementati 2017-12-06 2018-01-31 2018-07-30 Livelihoods Quotations Envelope for CBVs on MCDSW/SWL/010/18 / PROCUREMENT OF MOBILE PHONES FOR BENEFICIARIES Supporting Women's Single Stage - One IDA / 56580 Post Request for Bids Limited 325,000.00 234,232.64 Completed 2018-06-10 2018-06-12 2018-06-15 2018-08-27 2018-07-27 2018-09-05 2018-08-26 2018-09-28 2018-09-30 2018-11-09 2019-03-29 2018-12-11 FOR PHASE TWO FOR THE Livelihoods Envelope SUPPORING WOMENS LIVELIHOODS . ZM-MCDSW-65762-GO-RFQ / PROCUREMENT OF 86 COMPUTER TABLETS, 27 COMPUTER LAPTOPS, Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 71,500.00 32,557.66 Completed 2018-06-12 2018-04-20 2018-08-07 2018-06-04 2019-02-03 2018-07-04 INTERNET SECURITY (99 Livelihoods Quotations Envelope LICENCES) AND 86 SOLAR CHARGER POWER BANKS FOR DATA COLLECTION MCDSS/SWL/004/18 / PROCUREMENT OF FURNITURE Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 45,000.00 30,941.48 Completed 2018-06-18 2018-06-18 2018-08-13 2018-08-03 2019-02-09 2018-08-14 FOR THE THIRTY (30) SWL Livelihoods Quotations Envelope IMPLEMENTING DISTRICTS MCDSS/SWL/005/18 / PROCUREMENT OF IT EQUIPMENT (23 DESKTOPS, 23 Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 62,000.00 53,751.65 Signed 2018-06-20 2018-08-23 2018-08-15 2018-10-19 2019-02-11 2018-12-28 PRINTERS AND MICROSOFT Livelihoods Quotations Envelope OFFICE LICENCES (66 LICENCES) ) MCDSS/SWL/006/18 / PROCUREMENT OF CANOPIES Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 18,000.00 12,609.97 Signed 2018-06-20 2018-07-26 2018-08-15 2018-08-03 2019-02-11 FOR THE SWL PROJECT Livelihoods Quotations Envelope VEHICLES MCDSS/SWL/007/18 / PROCUREMENT OF TWO Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 24,000.00 0.00 Canceled 2018-07-11 2018-09-05 2019-03-04 SMALL BOATS FOR LUNGA Livelihoods Quotations Envelope DISTRICTS FOR THE CHANNELS MCDSS/SWL/008/18 / PROCUREMENT OF SIXTY (60) MOTOR BIKES FOR THE Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 294,000.00 0.00 Canceled 2018-06-16 2018-08-11 2019-02-07 COMMUNITY DEVELOPMENT Livelihoods Quotations Envelope ASSISTANTS (CDA) FOR THE SWL PHASE II DISTRICTS Page 2 MCDSS/SWL/009/18 / Procurement of 1050 Bicycles Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 99,800.00 79,832.64 Completed 2018-06-20 2018-04-30 2018-08-15 2018-08-03 2019-02-11 2018-12-05 for Community based Livelihoods Quotations Envelope Volunteers (CBVS) MCDSS/SWL/011/18 / PROCUREMENT OF SIM CARDS Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 13,000.00 18,577.40 Signed 2018-07-11 2018-11-02 2018-09-05 2018-08-03 2019-03-04 AND AIRTIME FOR SWL PHASE Livelihoods Quotations Envelope II BENEFICIARIES MCDSS/SWL/012/81 / Procurement of Umbrellas and Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 59,000.00 48,472.81 Completed 2018-07-11 2018-09-13 2018-09-05 2018-09-24 2019-03-04 2018-10-30 Branded T Shirts for CDAs and Livelihoods Quotations Envelope CBVs MCDSS/SWL/013/18 / Procurement of Rain Coats Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 95,000.00 53,087.87 Completed 2018-08-08 2018-09-07 2018-10-03 2018-09-24 2019-04-01 2018-10-19 and Gum Boots for CDAs and Livelihoods Quotations Envelope CBVS MCDSS/SWL/014/18 / Procurement of 300 Branded Supporting Women's Request for Single Stage - One Diaries, 300 Branded IDA / 56580 Post Limited 30,000.00 0.00 Canceled 2018-07-11 2018-09-05 2019-03-04 Livelihoods Quotations Envelope Organizers and 300 Calendars for 2019 MCDSS/SWL/015/18 / Procurement of Ten (10) 13 Supporting Women's UN Agencies Seaters Toyota Landcruiser IDA / 56580 Post Direct 400,000.00 329,171.96 Signed 2018-06-15 2018-10-11 2018-06-20 2018-12-17 2018-07-25 2019-02-14 2019-01-21 Livelihoods (Direct) Motor Vehicles for SWL Phase Three Districts MCDSS/SWL/016/18 / Procurement of a Motor Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 45,000.00 33,260.78 Completed 2018-06-20 2018-06-18 2018-08-15 2018-08-03 2019-02-11 2018-09-18 Vehicle for Procurement and Livelihoods Quotations Envelope Logistics MCDSS/SWL/006/19 / Supporting Women's Request for Single Stage - One Procurement of forty (40) IDA / 56580 Post Limited 230,000.00 215,800.00 Signed 2019-02-23 2019-02-27 2019-04-20 2019-07-26 2019-10-17 Livelihoods Quotations Envelope Motor - Bikes for CDAs MCDSS/003/19 / Procurement of 42,127 Mobile Supporting Women's Single Stage - One IDA / 56580 Post Request for Bids Limited 632,000.00 0.00 Canceled 2019-03-11 2019-03-16 2019-04-27 2019-05-27 2019-07-01 2019-12-28 Phones for SWL Phase 3 Livelihoods Envelope Beneficiaries MCDSS/SWL/004/19 / Supporting Women's Request for Single Stage - One Procurement of networking IDA / 56580 Post Limited 38,000.00 0.00 Canceled 2019-03-09 2019-05-04 2019-10-31 Livelihoods Quotations Envelope tools for SWL MCDSS/SWL/001/19 / Procurement of Data Supporting Women's Request for Single Stage - One Collection Tools (Tablets and IDA / 56580 Post Limited 54,000.00 34,183.79 Completed 2019-04-17 2019-04-24 2019-06-12 2019-07-23 2019-12-09 2020-01-20 Livelihoods Quotations Envelope Solar Chargers) for the SWL Phase 3 activities MCDSS/SWL/005/19 / Procurement of 20 Desktop Computers, 20 Computer Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 72,000.00 22,052.65 Completed 2019-04-17 2019-04-24 2019-06-12 2019-08-19 2019-12-09 2019-09-02 Laptops and 20 Printers for Livelihoods Quotations Envelope SWL Phase 3 Implementing Districts MCDSS/SWL/003/19 / Supply Supporting Women's Single Stage - One and Delivery of 42,127 mobile IDA / 56580 Post Request for Bids Limited 632,000.00 475,188.71 Completed 2019-08-09 2019-07-29 2019-08-14 2019-08-01 2019-09-25 2019-08-16 2019-10-25 2019-08-27 2019-11-29 2019-09-18 2020-05-27 2019-12-13 Livelihoods Envelope Phones for Phase Three MCDSS/SWL/011/19 / Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 98,700.00 71,603.84 Completed 2019-10-09 2019-10-03 2019-12-04 2020-01-30 2020-06-01 2020-05-26 Procurement of 1050 Bicycles Livelihoods Quotations Envelope MCDSS/SWL/012/19 / Supporting Women's Request for Single Stage - One Procurement of a Double Cab IDA / 56580 Post Limited 45,000.00 0.00 Canceled 2019-10-25 2019-12-20 2020-06-17 Livelihoods Quotations Envelope 4 x 4 Motor Vehicle MCDSS/ISSB//013/19 / Procurement of 710 mobile Institutional Strengthening Request for Single Stage - One IDA / 56580 Post Limited 98,500.00 71,933.18 Signed 2019-11-22 2019-11-01 2020-01-17 2019-10-15 2020-07-15 phones for the ZISPIS Pilot and Systems Building Quotations Envelope Program MCDSS/ISSB/014/19 / Procurement of Seventeen Institutional Strengthening Request for Single Stage - One IDA / 56580 Post Limited 20,000.00 15,282.46 Completed 2019-11-22 2019-11-01 2020-01-17 2019-11-15 2020-07-15 2019-11-20 (17) Tablet Computers for the and Systems Building Quotations Envelope ZISPIS Pilot Program ZM-MCDSW-166581-GO-DIR Pending / Procurement of Routers , Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 12,000.00 0.00 Implementati 2020-04-04 2020-05-30 2020-11-26 Talk Time and internet Livelihoods Quotations Envelope on subscription for SWL Officers MCDSS/SWL/002/2020 / Procurement of Various Supporting Women's Request for Single Stage - One COVID 19 Materials (face IDA / 56580 Post Limited 33,837.83 28,943.29 Completed 2020-08-19 2020-08-14 2020-10-14 2020-09-14 2021-04-12 2020-09-17 Livelihoods Quotations Envelope masks, soaps and hand sanitizers) ZM-MCDSW-180338-GO- RFQ / Procurement of 10 Institutional Strengthening Request for Single Stage - One IDA / 56580 Post Limited 9,000.00 0.00 Canceled 2020-08-19 2020-10-14 2021-04-12 Computer Laptops for various and Systems Building Quotations Envelope ministry staff ZM-MCDSW-188206-GO- RFQ / Procurement of Motor Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 40,000.00 34,811.38 Signed 2020-08-26 2020-09-03 2020-10-21 2020-09-14 2021-04-19 Vehicle for the SWL Project Livelihoods Quotations Envelope office MCDSS/003/19-2 / Supporting Women's Request for Single Stage - One Procurement of Various ICT IDA / 56580 Post Limited 13,500.00 11,321.00 Completed 2020-08-22 2020-06-01 2020-10-17 2020-07-17 2021-04-15 2020-08-12 Livelihoods Quotations Envelope Equipment Page 3 MCDSS/004/20 / Supporting Women's Request for Single Stage - One Procurement of additional IDA / 56580 Post Limited 19,000.00 16,209.73 Completed 2020-09-09 2020-09-09 2020-11-04 2020-09-23 2021-05-03 2020-09-28 Livelihoods Quotations Envelope 1900 mobile phones for CBVS MCDSS/SWL/005/20 / Supporting Women's Request for Single Stage - One Procurement of additional 980 IDA / 56580 Post Limited 99,690.00 83,340.21 Signed 2020-09-09 2020-09-03 2020-11-04 2020-09-23 2021-05-03 Livelihoods Quotations Envelope bicycles for CBVS MCDSS/SWL/007/20 / Supporting Women's Request for Single Stage - One Procurement of Rain suits for IDA / 56580 Post Limited 32,000.00 24,663.30 Completed 2020-09-16 2020-09-03 2020-11-11 2020-09-23 2021-05-10 2020-09-25 Livelihoods Quotations Envelope CBVs MCDSS/SWL/010/20 / Supporting Women's Request for Single Stage - One Procurement of 3 IDA / 56580 Post Limited 1,946.00 1,800.71 Completed 2020-09-05 2020-09-08 2020-10-31 2020-09-17 2021-04-29 2020-09-23 Livelihoods Quotations Envelope Multifunctional Printers MCDSS/SWL/011/20 / Procurement of 300 Supporting Women's Request for Single Stage - One Calendars, 250 Diaries and IDA / 56580 Post Limited 15,500.00 11,881.28 Completed 2020-09-16 2020-09-07 2020-11-11 2020-09-23 2021-05-10 2020-12-10 Livelihoods Quotations Envelope 250 Organizers for the 2021 calendar year MCDSS/SWL/012/20 / Procurement of 17 Laptop Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 68,647.06 57,673.57 Completed 2020-10-21 2020-11-24 2020-12-16 2021-01-20 2021-06-14 2021-01-22 Computers and 180 Tablet Livelihoods Quotations Envelope Computers for the SWL MCDSS/SCT/001/20 / Request for Single Stage - One Procurement of various COVID IDA / 65690 Keeping Girls in School Post Limited 40,000.00 31,664.02 Completed 2020-10-28 2020-10-12 2020-12-23 2020-11-03 2021-06-21 2020-11-04 Quotations Envelope 19 materials MCDSS/SCT/004/20 / Pending Procurement of 7,800 Single Stage - One IDA / 65690 Keeping Girls in School Post Request for Bids Limited 200,000.00 0.00 Implementati 2020-10-30 2020-11-04 2020-12-16 2021-01-15 2021-02-19 2021-08-18 Grievance Mechanism Redress Envelope on Boxes MCDSS/SWL/016/2020 / Supporting Women's Single Stage - One Procurement of 1145 bicycles IDA / 65690 Post Request for Bids Limited 127,970.59 119,562.97 Signed 2020-11-20 2020-12-14 2020-11-25 2020-12-17 2021-01-06 2020-12-24 2021-02-05 2021-01-13 2021-03-12 2021-02-09 2021-09-08 Livelihoods Envelope for Phase 4 CBVs MCDSS/SWL/015/20 / Procurement of various ICT Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 34,428.24 27,628.70 Completed 2020-11-25 2020-11-18 2021-01-20 2020-12-15 2021-07-19 2021-01-28 equipment for SWL Phase 4 Livelihoods Quotations Envelope activities MCDSS/SCT/003/20 / Pending Request for Single Stage - One Procurement of Various ICT IDA / 65690 Keeping Girls in School Post Limited 135,000.00 0.00 Implementati 2020-12-02 2021-01-27 2021-07-26 Quotations Envelope equipment for ZISPIS on MCDSS/SCT/014/20 / Pending Procurement of additional Request for Single Stage - One IDA / 65690 Keeping Girls in School Post Limited 72,000.00 0.00 Implementati 2020-12-23 2021-02-17 2021-08-16 Covid -19 materials for SCT Quotations Envelope on Districts MCDSS/SCT/015/20 / Pending Procurement of 1,800 rain Request for Single Stage - One IDA / 65690 Keeping Girls in School Post Limited 86,000.00 0.00 Implementati 2020-12-23 2021-02-17 2021-08-16 suits, 1,800 umbrellas Quotations Envelope on and1,800 gumboots MCDSS/SWL/018/20 / Supporting Women's Request for Single Stage - One Procurement of Office IDA / 65690 Post Limited 7,800.00 9,270.90 Completed 2020-12-23 2020-12-09 2021-02-17 2020-12-15 2021-08-16 2020-12-16 Livelihoods Quotations Envelope Furniture MCDSS/SWL/014/2020 / Supporting Women's Request for Single Stage - One Procurement of 1,145 IDA / 65690 Post Limited 15,154.41 11,486.55 Completed 2020-12-29 2021-01-07 2021-02-23 2021-01-27 2021-08-22 2021-02-08 Livelihoods Quotations Envelope Branded Umbrellas MCDSS/SWL/004/21 / Pending Supporting Women's Request for Single Stage - One Procurement of COVID 19 IDA / 65690 Post Limited 25,000.00 0.00 Implementati 2021-03-03 2021-04-28 2021-10-25 Livelihoods Quotations Envelope materials on MCDSS/SWL/005/21 / Pending Procurement of 10,012 Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 99,750.00 0.00 Implementati 2021-03-02 2021-04-27 2021-10-24 Complaint form books and Livelihoods Quotations Envelope on 110 Manuals MCDSS/SWL/007/21 / Pending Supporting Women's Request for Single Stage - One Procurement of 1,000 mobile IDA / 65690 Post Limited 90,000.00 0.00 Implementati 2021-03-03 2021-04-28 2021-10-25 Livelihoods Quotations Envelope phones on MCDSS/SWL002/21 / Under Supporting Women's UN Agencies Procurement of Twelve (12) IDA / 65690 Post Direct 550,000.00 0.00 Implementati 2021-02-26 2021-02-11 2021-03-03 2021-04-07 2021-10-04 Livelihoods (Direct) Landcruiser Motor vehicles on MCDSS/SWL/003/21 / Pending Supporting Women's Single Stage - One Procurement of 30 Motor IDA / 65690 Post Request for Bids Open - National 195,000.00 0.00 Implementati 2021-02-26 2021-03-03 2021-04-14 2021-05-14 2021-06-18 2021-12-15 Livelihoods Envelope Bikes for SWL on MCDSS/SWL/008/21 / Pending Supporting Women's Single Stage - One Procurement of 23, 017 IDA / 65690 Post Request for Bids Open - National 211,537.19 0.00 Implementati 2021-03-12 2021-03-17 2021-04-28 2021-05-28 2021-07-02 2021-12-29 Livelihoods Envelope Mobile Phones on Pending MCDSS/SWL/009/21 / Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 11,500.00 0.00 Implementati 2021-03-17 2021-05-12 2021-11-08 Procurement of sim cards Livelihoods Quotations Envelope on MCDSS/SWL/010/21 / Pending Supporting Women's Request for Single Stage - One Procurement of 150 boxes IDA / 65690 Post Limited 10,000.00 0.00 Implementati 2021-03-24 2021-05-19 2021-11-15 Livelihoods Quotations Envelope and CBT manuals English on version MCDSS/SWL/012/21 / Pending procurement of pull banners, Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 6,000.00 0.00 Implementati 2021-05-19 2021-07-14 2022-01-10 branded shirts, golf shirts and Livelihoods Quotations Envelope on caps Pending MCDSS/SWL/013/21 / Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 15,000.00 0.00 Implementati 2021-06-16 2021-08-11 2022-02-07 Procurement of CCTV Livelihoods Quotations Envelope on Page 4 MCDSS/SWL/014/21 / Pending Procurement of Thirty Five Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 16,000.00 0.00 Implementati 2021-06-16 2021-08-11 2022-02-07 (35) Microsoft Office Licences Livelihoods Quotations Envelope on Computers NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MCDSW/NCS/001 / Printing Pending Supporting Women's Single Stage - One of teaching and learning IDA / 56580 Post Request for Bids Open - National 448,300.00 0.00 Implementati 2017-01-25 2017-01-30 2017-03-13 2017-04-12 2017-05-17 2017-11-13 Livelihoods Envelope materials on MCDSS/SWL/003/18 / PRINTING OF LIFE SKILSS, Supporting Women's Request for Single Stage - One BUSINESS SKILLS AND IDA / 56580 Post Limited 52,000.00 3,352,422.08 Completed 2018-06-12 2018-04-02 2018-08-07 2018-06-04 2019-02-03 2018-07-04 Livelihoods Quotations Envelope REFRESHER TRAINING MATERIALS MCDSS/SWL/002/18 / Supporting Women's Request for Single Stage - One PRINTING OF VARIOUS IEC IDA / 56580 Post Limited 20,000.00 0.00 Canceled 2018-06-12 2018-08-07 2019-02-03 Livelihoods Quotations Envelope MATERIALS MCDSS/002/19 / Printing of Life Skills, Business Skills and Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 72,000.00 0.00 Canceled 2019-03-16 2019-05-11 2019-11-07 Refresher Training Materials Livelihoods Quotations Envelope for Phase 3 MCDSS/SWL/007/19 / Design and Printing of ICE Materials Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 15,000.00 10,541.55 Completed 2019-04-13 2019-02-18 2019-06-08 2019-03-04 2019-12-05 2019-03-15 (Brochures, Posters and Livelihoods Quotations Envelope Factsheets) MCDSS/002/19-2 / Tender for the Printing of Life Skills, Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 72,000.00 55,901.94 Completed 2019-05-29 2019-05-09 2019-07-24 2019-07-25 2020-01-20 2019-09-02 Business Skills and Refresher Livelihoods Quotations Envelope Course Training Materials MCDSS/SWL/015/19 / Design, Printing and Supply of Supporting Women's GRM Manuals, Complaint IDA / 56580 Prior Direct Selection Direct 150,000.00 0.00 Canceled 2019-11-24 2019-11-29 2020-01-03 2020-07-01 Livelihoods Forms and A! Illustration Posters MCDSS/SWL/016/19 / Supporting Women's Request for Single Stage - One Design, Printing and Supply of IDA / 56580 Post Limited 82,000.00 33,448.94 Completed 2019-11-30 2019-11-11 2020-01-25 2020-01-30 2020-07-23 2020-03-27 Livelihoods Quotations Envelope GRM Brochures and Fliers MCDSS/SWL/001/20 / Printing of 7,312 Complaint Supporting Women's Single Stage - One IDA / 56580 Post Request for Bids Limited 118,572.97 80,323.94 Completed 2020-08-21 2020-08-12 2020-08-26 2020-08-14 2020-10-07 2020-08-21 2020-11-06 2020-08-31 2020-12-11 2020-09-14 2021-06-09 2020-09-17 form Books for the Grievance Livelihoods Envelope Redress Mechanism (GRM) MCDSS/SWL/013/2020 / Printing of 5,784 Life Skills, Supporting Women's Request for Single Stage - One IDA / 56580 Post Limited 44,117.65 40,438.72 Completed 2020-10-21 2020-11-10 2020-12-16 2020-12-18 2021-06-14 2020-12-28 Business Skills and Refresher Livelihoods Quotations Envelope course training materials MCDSS/SWL/017/20 / Supporting Women's Request for Single Stage - One Printing for IEC Materials for IDA / 65690 Post Limited 24,390.24 22,760.28 Completed 2020-12-23 2020-12-09 2021-02-17 2021-01-27 2021-08-16 2021-02-04 Livelihoods Quotations Envelope Phase 4 activities MDSS/SWL/019/20 / Printing and Delivery of 2407 CBT Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 39,000.00 72,353.37 Completed 2021-01-05 2021-01-07 2021-03-02 2021-01-27 2021-08-29 2021-02-06 manuals and 1928 Picture Livelihoods Quotations Envelope Books MCDSS/SWL/001/21 / Pending Procurement of services for Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 34,000.00 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 the translation of training Livelihoods Quotations Envelope on materials MCDSS/SWL/006/21 / Design Pending and printing of IEC materials Supporting Women's Request for Single Stage - One IDA / 65690 Post Limited 65,600.00 0.00 Implementati 2021-03-03 2021-04-28 2021-10-25 for savings, payments and Livelihoods Quotations Envelope on GRM MCDSS/SWL/011/21 / Pending Supporting Women's Request for Single Stage - One Procurement of IDA / 65690 Post Limited 11,000.00 0.00 Implementati 2021-05-19 2021-07-14 2022-01-10 Livelihoods Quotations Envelope communication materials on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MCDSW/C/001 / Survey Supporting Women's Quality And Cost- Emuneration of SWL IDA / 56580 Prior Open - National 937,500.00 0.00 Canceled 2017-03-06 2017-03-27 2017-05-10 2017-06-07 2017-07-07 2017-08-11 2017-09-15 2018-09-15 Livelihoods Based Selection beneficiaries MCDSW/C/002 / Information, Consultant education and Supporting Women's IDA / 56580 Post Qualification Open - National 200,000.00 0.00 Canceled 2016-05-16 2016-06-06 2016-07-20 2016-08-19 2016-09-23 2017-03-22 communications outreach at Livelihoods Selection local and national level MCDSW/C/003 / Service Supporting Women's Quality And Cost- provider to pay productivity IDA / 56580 Prior Open - International 845,000.00 0.00 Canceled 2016-01-04 2016-01-25 2016-11-30 2016-12-28 2017-01-27 2017-03-03 2017-04-07 2018-04-07 Livelihoods Based Selection grants to beneficiaries MCDSW/C/016 / Consultancy Supporting Women's Quality Based to support roll-out and IDA / 56580 Prior Open - National 1,300,000.00 0.00 Canceled 2016-05-09 2016-05-30 2016-07-13 2016-12-02 2017-01-28 2017-01-01 2017-02-07 2017-01-31 2017-03-07 2018-03-07 Livelihoods Selection implementation of SWL Page 5 MCDSW/C/017 / Design of Consultant and operational guidelines for Supporting Women's IDA / 56580 Post Qualification Open - National 90,000.00 0.00 Canceled 2016-01-18 2016-02-08 2016-03-23 2016-04-22 2016-05-27 2016-11-23 targeting and identification of Livelihoods Selection SWL beneficiaries MCDSW/C/018 / Consultant Development of strategy ad Supporting Women's IDA / 56580 Post Qualification Open - National 120,000.00 0.00 Canceled 2017-01-25 2017-02-15 2017-03-31 2017-04-30 2017-06-04 2017-12-01 tools for SWL GRS, and suppirt Livelihoods Selection to launch and operate the GRS MCDSW/C/021 / Impact Supporting Women's Quality And Cost- IDA / 56580 Prior Open - National 1,030,000.00 437,168.00 Completed 2017-06-06 2017-05-21 2017-06-27 2017-08-10 2017-10-13 2017-09-07 2017-12-19 2017-10-07 2018-03-13 2017-11-11 2018-08-06 2017-12-16 2018-08-26 2018-12-16 2019-03-29 evaluation data collection Livelihoods Based Selection Consultant MCDSW/C/05 / Updating Supporting Women's IDA / 56580 Post Qualification Open - National 100,000.00 0.00 Canceled 2016-11-16 2016-12-07 2017-01-20 2017-02-19 2017-03-26 2017-09-22 Operations Manual Livelihoods Selection MCDSW/C/06 / Assessment Consultant Supporting Women's of options to identifying IDA / 56580 Post Qualification Open - National 100,000.00 0.00 Canceled 2017-07-17 2017-08-07 2017-09-20 2017-10-20 2017-11-24 2018-05-23 Livelihoods beneficiaries of NRCs Selection MCDSW/C/07 / Inventory of Consultant Supporting Women's existing complimentary IDA / 56580 Post Qualification Open - National 40,000.00 0.00 Canceled 2017-01-19 2017-02-09 2017-03-25 2017-04-24 2017-05-29 2017-11-25 Livelihoods activities Selection Consultant MCDSW/C/08 / Software Supporting Women's IDA / 56580 Post Qualification Open - National 150,000.00 0.00 Canceled 2017-03-28 2017-04-18 2017-06-01 2017-07-01 2017-08-05 2018-02-01 design and implementation Livelihoods Selection Consultant MCDSW/C/01 / Development Supporting Women's IDA / 56580 Post Qualification Open - National 150,000.00 0.00 Canceled 2016-12-04 2017-01-13 2016-12-25 2017-02-07 2017-03-09 2017-04-13 2017-10-10 of M&E framework Livelihoods Selection MCDSW/C/020 / Implementation evaluation Supporting Women's Quality And Cost- IDA / 56580 Prior Open - National 200,000.00 0.00 Canceled 2017-01-03 2017-01-24 2017-03-09 2017-04-06 2017-05-06 2017-06-10 2017-07-15 2018-07-15 and beneficiary satisfaction Livelihoods Based Selection survey MCDSW/C/02 / Development Supporting Women's Quality And Cost- of MIS module for SWL and IDA / 56580 Prior Open - National 350,000.00 0.00 Canceled 2016-07-18 2016-08-08 2016-09-21 2017-02-17 2017-03-19 2017-08-11 2017-04-23 2017-05-28 2018-05-28 Livelihoods Based Selection non-formal Literacy MCDSW/C/03 / Enhancement Consultant Supporting Women's of Management Information IDA / 56580 Post Qualification Open - National 150,000.00 0.00 Canceled 2017-10-09 2017-10-30 2017-12-13 2018-01-12 2018-02-16 2018-08-15 Livelihoods System /Single Registry B Selection MCDSS/C/023 / Technical Supporting Women's Quality Based Assistance for Roll-Out and IDA / 56580 Prior Open - National 1,300,000.00 0.00 Canceled 2017-10-12 2017-10-17 2017-10-26 2017-10-31 2017-11-05 2017-12-21 2017-12-03 2018-04-06 2017-12-08 2018-04-17 2017-12-20 2018-01-24 2019-01-24 Livelihoods Selection Implementation of SWL MCDSS/C/026/17 / Consultancy Services for the Consultant Institutional Strengthening Service Level Agreement for IDA / 56580 Post Qualification Open - National 15,000.00 0.00 Canceled 2017-12-08 2017-12-29 2018-02-11 2018-03-13 2018-04-17 2018-10-14 and Systems Building the Single Registry of Selection Household Beneficiaries (SRB) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MCDSW/C/019 / Strategy for Individual harmonization of MCDSW Supporting Women's IDA / 56580 Post Consultant Open 60,000.00 0.00 Canceled 2017-02-15 2017-04-05 2017-04-26 2017-05-31 2017-11-27 empowerment/livelihood Livelihoods Selection programs MCDSW/C/04 / Updating the trainig strategy for MCDSW Individual Supporting Women's staff in M&E and develop a IDA / 56580 Post Consultant Open 20,000.00 0.00 Canceled 2017-01-10 2017-02-28 2017-03-21 2017-04-25 2017-10-22 Livelihoods strategy for capacity Selection development in policy analysis MCDSW/C/09 / TA to Individual Supporting Women's National Social Protection Co- IDA / 56580 Post Consultant Open 40,000.00 0.00 Canceled 2016-11-17 2017-01-05 2017-01-26 2017-03-02 2017-08-29 Livelihoods ordination Unit Selection Individual MCDSW/C/9 / Development Supporting Women's IDA / 56580 Post Consultant Open 15,000.00 0.00 Canceled 2017-01-09 2017-02-27 2017-03-20 2017-04-24 2017-10-21 of a strategy for good practice Livelihoods Selection Individual MCDSW/C/004 / Hiring of Supporting Women's IDA / 56580 Prior Consultant Open 112,500.00 0.00 Canceled 2015-11-04 2015-12-23 2016-04-04 2016-05-09 2018-03-31 SWL Manager Livelihoods Selection Individual Supporting Women's Pending MCDSW/C/006 / M&E Officer IDA / 56580 Post Consultant Open 89,100.00 0.00 2015-11-04 2015-12-23 2016-06-06 2016-07-11 2018-07-31 Livelihoods Implementation Selection Individual MCDSW/C/009 / Program Supporting Women's IDA / 56580 Post Consultant Open 89,100.00 0.00 Canceled 2015-11-04 2015-12-23 2016-06-06 2016-07-11 2018-07-31 Officer Livelihoods Selection Individual MCDSW/C/011 / Program Supporting Women's IDA / 56580 Post Consultant Open 89,100.00 0.00 Canceled 2015-11-04 2015-12-23 2016-06-06 2016-07-11 2018-07-31 Officer Livelihoods Selection Individual MCDSW/C/012 / Program Supporting Women's IDA / 56580 Post Consultant Open 89,100.00 0.00 Canceled 2015-11-04 2015-12-23 2016-06-06 2016-07-11 2018-07-31 Officer Livelihoods Selection Individual MCDSW/C/013 / Program Supporting Women's IDA / 56580 Post Consultant Open 89,100.00 0.00 Canceled 2015-11-04 2015-12-23 2016-06-06 2016-07-11 2018-07-31 Officer Livelihoods Selection Page 6 Individual MCDSW/C/014 / Program Supporting Women's Pending IDA / 56580 Post Consultant Open 97,200.00 0.00 2015-11-04 2015-12-23 2016-04-04 2016-05-09 2018-03-31 Accountant Livelihoods Implementation Selection Individual MCDSW/C/007 / ICT Supporting Women's Pending IDA / 56580 Post Consultant Open 97,500.00 0.00 2015-11-04 2015-12-23 2016-06-06 2016-07-11 2018-07-31 Specialist Livelihoods Implementation Selection Individual MCDSW/C/005 / Hiring of Supporting Women's Pending IDA / 56580 Post Consultant Open 97,500.00 0.00 2015-11-03 2015-12-22 2016-04-03 2016-05-08 2018-03-30 SWL M&E Specialist Livelihoods Implementation Selection Individual Supporting Women's MCDSW/C/008 / ICT Officer IDA / 56580 Post Consultant Open 89,100.00 0.00 Canceled 2015-11-03 2015-12-22 2016-06-05 2016-07-10 2018-07-30 Livelihoods Selection Individual MCDSW/C/010 / Program Supporting Women's IDA / 56580 Post Consultant Open 89,100.00 0.00 Canceled 2015-11-03 2015-12-22 2016-06-05 2016-07-10 2018-07-30 Officer Livelihoods Selection Individual ZM-MCDSW-4860-CS-INDV / Supporting Women's IDA / 56580 Post Consultant Open 44,550.00 0.00 Canceled 2017-01-09 2017-03-14 2017-02-27 2017-03-20 2017-04-24 2017-10-21 Procurement Specialist Livelihoods Selection Individual ZM MCDSW-4860CS-INDV / Supporting Women's Under IDA / 56580 Post Consultant Limited 85,800.00 0.00 2017-03-14 2017-03-24 2017-03-19 2017-04-09 2017-05-14 2017-11-10 Procurement Specialist Livelihoods Implementation Selection Individual ZM MCDSW/C/022 / Logistics Supporting Women's Under IDA / 56580 Post Consultant Open 66,000.00 0.00 2017-04-06 2017-04-05 2017-05-25 2017-06-15 2017-07-20 2018-01-16 Officer Livelihoods Implementation Selection Individual MCDSW/C/015 / Assistant Supporting Women's IDA / 56580 Post Consultant Open 77,760.00 0.00 Canceled 2017-11-22 2017-12-07 2018-01-10 2018-05-30 2018-07-04 2020-07-23 Accountant Livelihoods Selection Individual MCDSS/C/025/17 / Hiring of Supporting Women's IDA / 56580 Post Consultant Limited 77,000.00 0.00 Canceled 2017-12-08 2017-12-07 2017-12-13 2018-01-03 2018-02-07 2018-08-06 a Data Management Specialist Livelihoods Selection MCDSS/SWL/C/003/18 / Consultancy services for the Supporting Women's Under IDA / 56580 Post Direct Selection Direct 170,000.00 0.00 2018-05-11 2018-05-22 2018-05-21 2018-06-05 2018-07-25 2019-01-21 development of a Livelihoods Implementation Management Information System MCDSS/SWL/C/001/19 / Consultancy services for the Supporting Women's Mid line Survey for the Impact IDA / 56580 Prior Direct Selection Direct 480,000.00 589,995.00 Signed 2019-04-22 2019-05-20 2019-05-02 2019-08-15 2019-07-06 2020-08-26 2020-01-02 Livelihoods Evaluation for the Supporting Women's Livelihoods MCDSS/SWL/013/19 / Individual Supporting Women's Employment of an Assistant IDA / 56580 Post Consultant Limited 45,000.00 0.00 Canceled 2020-10-16 2020-10-21 2020-11-11 2020-12-16 2021-06-14 Livelihoods Accountant for the SWL Selection MCDSS/SWL/C/001/2020 / Individual Consultancy Services for the Supporting Women's Under IDA / 56580 Post Consultant Open 39,000.00 0.00 2020-09-11 2020-08-27 2020-10-30 2020-10-26 2020-11-20 2020-12-02 2020-12-25 2021-06-23 recruitment of a Payment Livelihoods Implementation Selection Specialist for the SWL MCDSS/SWL/C/002/2020 / Individual Consultancy Services for the Supporting Women's Under IDA / 56580 Post Consultant Open 32,400.00 0.00 2020-09-11 2020-08-27 2020-10-30 2020-11-20 2020-12-25 2021-06-23 recruitment of an Monitoring Livelihoods Implementation Selection and Evaluation Officer MCDSS/SWL/C/003/20 / Individual Consultancy Services for the Supporting Women's Under IDA / 56580 Post Consultant Open 32,400.00 0.00 2020-09-11 2020-08-27 2020-10-30 2020-11-20 2020-12-25 2021-06-23 Recruitment of the Livelihoods Implementation Selection Accountant MCDSS/SWL/C/004/2020 / Consultancy Services for Individual Supporting Women's engagement of a Monitoring IDA / 56580 Post Consultant Open 39,000.00 0.00 Canceled 2020-10-23 2020-12-11 2021-01-01 2021-02-05 2021-08-04 Livelihoods and Evaluation (M&E) Selection Specialist for the SWL MCDSS/SCT/001/C/21 / Individual Consultancy for the Individual Under engagement of a Financial IDA / 65690 Keeping Girls in School Post Consultant Direct 72,000.00 0.00 2021-01-22 2021-02-01 2021-02-01 2021-02-22 2021-03-29 2021-09-25 Implementation Management Specialist for the Selection Social Cash Transfer (SCT) MCDSS/SCT/002/C/2021 / Individual Engagement of ten (10) Under IDA / 65690 Keeping Girls in School Prior Consultant Direct 528,000.00 0.00 2021-01-27 2021-02-01 2021-02-06 2021-02-27 2021-04-03 2021-09-30 provincial project accountants Implementation Selection for the SCT. MCDSS/SWL/C/005/20 / Individual Consultancy Services for the Supporting Women's IDA / 56580 Post Consultant Open 72,000.00 0.00 Canceled 2020-10-23 2020-12-11 2021-01-01 2021-02-05 2021-08-04 engagement of a Program Livelihoods Selection Officer for the SWL Page 7 Albania Result Based Road Maintenance and Safety Project: (P132982) Procurement plan Textual part I. General 1. Project Information: Country: Albania Borrower: Ministry of Finance Project Name: Result Based Road Maintenance and Safety Project Loan No: P133982 Project Implementing Agency: Ministry of Infrastructure and Energy (MIE); Albanian Road Authority (ARA) 2. Bank’s Approval Date of the Procurement Plan: Original: 30-Jan-15 (Neg. Date) Updates: 21-Oct-15 (2nd) 31-Mar-16 (3rd) 11-Oct-16 (4th) 5-Jun-17 (5th) 5-Jun-18 (6th) 13-Sep-18 (7th) 13-Jan-20 (8th) 3. Date of General 29- Procurement Notice: Apr- 15 4. Period covered by this procurement plan: First 36 months I. Goods and Works and non-consulting services Prior Review Threshold: Procurement subject to Prior Review by the Bank in accordance with Appendix 1 to the Guidelines: Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers (January 2011, revised July 2014) Procurement Method Prior Review Thresholds (USD) Method Thresholds (USD million) 1 ICB Works= or> All works contracts above $10 m; All $ 0.2 m Goods contracts above $ 2 m Goods = or > $ 0.1m 2 Shopping and Works < $ First shopping contract small works 0.2 m Goods < $ 0.1 m 3 Direct Contracting Works= or> For any single source contract the $ 0.2 m PMU/ARA shall provide justification to Goods = or > the Bank and will include it in the $ 0.1m procurement plan only after Bank's clearance is granted *) All contracts subject to justification for direct contracting and confirmation that price of items are consistent with the prevailing market price. II. Selection of Consultants Prior Review Threshold: Selection subject to Prior Review by the Bank in accordance with Appendix 1 to the Guidelines Selection and Employment of Consultants (January 2011, revised July 2014) Selection Method Prior Review Threshold Method Threshold 1 Contracts with QCBS > $ 0.3 First contract for each method, and All Firms m contracts above $ 1 m CQ < $ 0.3 m FBS QBS LCS 2 Contracts with First contract and all individual Individual contracts above $ 0.3 m Consultants 2 Single source QCBS > $ 0.3 For any single source contract the m PMU/ARA shall provide justification to CQ < $ 0.3 m the Bank and will include it in the FBS procurement plan only after Bank's QBS clearance is granted LCS *) CQ - Consultants Qualifications for consulting services valued at equal to or less than $ 300,000. *) All TORs are subject to Bank's review and no objection. Short list comprising entirely of national consultants: Shortlist of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT Albania : Results-based Road Maintenance and Safety Project PLAN General Information Country: Albania Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132982 GPN Date: Project Name: Results-based Road Maintenance and Safety Project Loan / Credit No: TF / 14761, IBRD / 84890 Albanian Road Authority Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CW/2015/3 / Output and Component 1 - Maintenance Single Stage - One 14,426,969. performance based road IBRD / 84890 Prior Request for Bids Open - International 0.00 Signed 2017-01-30 2017-02-23 Works and Monitoring Envelope 13 maintenance Lot 3 CW/2015/1, CW/2015/2, CW/2015/04 / Output and Component 1 - Maintenance Single Stage - One 59,269,945. IBRD / 84890 Prior Request for Bids Open - International 0.00 Signed 2016-12-21 2017-01-24 Performance based Road Works and Monitoring Envelope 68 Maintenance Lot 1, 2 and 4 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS/SH/2014/1 / SUPPLY Component 1 - Maintenance Request for OF IT EQUIPMENT FOR TF / 14761 Prior Open - International 0.00 27,428.28 Signed 2014-10-25 Works and Monitoring Quotations CMD/ARA Goods G/2 / Financial Component 1 - Maintenance IBRD / 84890 Prior Direct Selection Direct 0.00 11,289.34 Signed 2016-05-10 Software for RRMS Project Works and Monitoring Under G/RS/1 / Road Safety Component 2 - Institutional Single Stage - One IBRD / 84890 Post Request for Bids Open - International 1,200,000.00 0.00 Implementati 2020-02-20 2020-06-04 2020-02-25 2020-06-12 2020-04-07 2020-09-02 2020-05-07 2021-05-27 2020-06-11 2020-12-08 Equipment Reforms Envelope on G/03 / Software and Component 1 - Maintenance Single Stage - One equipment's for RAMS IBRD / 84890 Prior Request for Bids Open - International 2,290,000.00 2,402,148.92 Signed 2020-03-15 2020-12-15 2020-03-20 2020-12-17 2020-04-05 2021-02-01 2020-05-05 2021-04-13 2020-06-09 2021-05-06 2020-12-06 Works and Monitoring Envelope Implementation. Under G/SH1 / Purchase of IT Component 4 - Project Request for Single Stage - One IBRD / 84890 Post Limited 4,700.00 0.00 Implementati 2020-02-19 2020-02-26 2020-04-15 2020-10-12 equipment for PMT staff Management and Audit Quotations Envelope on G/SH3 / Winter tires for Component 4 - Project Request for Single Stage - One IBRD / 84890 Post Limited 1,600.00 0.00 Canceled 2020-02-22 2020-04-18 2020-10-15 PMT's vehicles Management and Audit Quotations Envelope G/SH-OS1 / Office Supplies Component 4 - Project Request for Single Stage - One IBRD / 84890 Post Limited 3,400.00 3,549.65 Signed 2020-02-25 2020-02-13 2020-04-21 2020-03-30 2020-10-18 for PMT's staff Management and Audit Quotations Envelope Pending G/SH2 / Office Furniture for Component 4 - Project Request for Single Stage - One IBRD / 84890 Post Limited 6,500.00 0.00 Implementati 2020-02-22 2020-04-18 2020-10-15 PMT staff Management and Audit Quotations Envelope on GOODS/SH/2020/2/1 / Component 4 - Project Request for Single Stage - One IBRD / 84890 Post Limited 4,620.00 5,040.56 Signed 2020-04-11 2020-04-09 2020-06-06 2020-04-27 2020-12-03 Laptops for PMT staff Management and Audit Quotations Envelope GOODS/SH/2020/3 / Component 4 - Project Request for Single Stage - One IBRD / 84890 Post Limited 5,160.00 4,783.31 Signed 2020-06-08 2020-06-01 2020-08-03 2020-06-22 2021-01-30 Purchasing 3 Konditioners Management and Audit Quotations Envelope NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-3 / Consultant Services Component 1 - Maintenance Quality And Cost- for Road Asset Management IBRD / 84890 Prior Open - International 0.00 1,478,825.54 Signed 2018-10-11 2018-10-30 Works and Monitoring Based Selection System - RAMS CS 2 / Consultant Services for Component 1 - Maintenance Quality And Cost- Road Safety Technical IBRD / 84890 Prior Open - International 0.00 3,953,423.88 Signed 2018-10-16 2018-12-24 Works and Monitoring Based Selection Assistance CS 10 / Consultant Services for Technical and DLI Audit of Four Contracts of Output and Component 1 - Maintenance Quality And Cost- Performance based IBRD / 84890 Prior Open - International 0.00 1,178,961.37 Signed 2018-02-23 2018-03-05 Works and Monitoring Based Selection Maintenance Contracts for Albania National Road Network RRMSP-CS-1-QCBS / Component 1 - Maintenance Quality And Cost- Planning and preparation of TF / 14761 Prior Open - International 700,000.00 807,816.00 Signed 2014-04-10 2014-04-11 Works and Monitoring Based Selection the RRSMP project Page 1 CS.1 / Monitoring Consultant of Four Output and Performance-based Component 1 - Maintenance Quality And Cost- IBRD / 84890 Prior Open - International 0.00 6,247,000.45 Under Review 2016-11-23 2016-12-05 Maintenance Contracts for the Works and Monitoring Based Selection Albania National Road Network CS/5 / Technical Assistance Component 4 - Project Quality And Cost- Pending IBRD / 84890 Prior Open - International 1,000,000.00 0.00 2021-07-01 2021-07-22 2021-09-04 2021-10-02 2021-11-01 2021-12-06 2022-01-10 2023-01-10 for Completion Assessment Management and Audit Based Selection Implementation Component 2 - Institutional Quality And Cost- Pending CS4 / Road Safety Database IBRD / 84890 Prior Open - International 1,500,000.00 0.00 2020-03-31 2020-04-21 2020-06-04 2020-07-02 2020-08-01 2020-09-05 2020-10-10 2021-10-10 Reforms Based Selection Implementation CS9 / Preparation of a study Component 3 - Sector Quality And Cost- IBRD / 84890 Post Open - International 600,000.00 686,112.63 Signed 2020-03-15 2020-06-25 2020-04-05 2020-06-26 2020-05-19 2020-10-02 2020-06-16 2020-11-20 2020-07-16 2021-01-26 2020-08-20 2021-02-23 2020-09-24 2021-04-20 2021-09-24 for traffic Monitoring Center Support Based Selection CS6 / Support to medium Component 3 - Sector Quality And Cost- term network reconstruction IBRD / 84890 Prior Open - International 1,500,000.00 0.00 Canceled 2020-06-15 2020-07-06 2020-08-19 2020-09-16 2020-10-16 2020-11-20 2020-12-25 2021-12-25 Support Based Selection and rehabilitation program CS7 / Preparation of next Component 3 - Sector Quality And Cost- Pending series of Maintenance IBRD / 84890 Prior Open - International 1,140,000.00 0.00 2020-07-15 2020-07-22 2020-09-04 2020-10-02 2020-11-01 2020-12-06 2021-01-10 2021-07-29 Support Based Selection Implementation Contracts CS8 / Technical Assistance to the Ministry of Infrastructure Component 3 - Sector Quality And Cost- Pending IBRD / 84890 Prior Open - International 1,500,000.00 0.00 2020-04-15 2020-05-06 2020-06-19 2020-07-17 2020-08-16 2020-09-20 2020-10-31 2021-10-31 and Energy to prepare Sector Support Based Selection Implementation Strategy Monitoring Report CS29 / Feasibility Study and Detailed Design of the Road Component 3 - Sector Quality And Cost- Under IBRD / 84890 Prior Open - International 4,600,000.00 0.00 2020-08-25 2020-08-26 2020-09-15 2020-08-26 2020-10-29 2020-10-12 2020-11-26 2020-11-10 2020-12-26 2020-12-01 2021-01-30 2021-03-06 2022-03-06 Bridge Rehabilitation and Support Based Selection Implementation Reconstruction in Albania INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual Component 1 - Maintenance CS-12 / Project Manager IBRD / 84890 Prior Consultant Open 0.00 96,439.50 Signed 2016-07-13 2016-07-18 Works and Monitoring Selection Individual CS-13 / Procurement Component 1 - Maintenance IBRD / 84890 Prior Consultant Open 0.00 84,577.50 Signed 2016-08-16 2016-08-22 Specialist Works and Monitoring Selection CS 18 retender / Selection of Individual Component 1 - Maintenance International Individual IBRD / 84890 Prior Consultant Open 0.00 684,049.28 Signed 2017-11-10 2017-11-13 Works and Monitoring Technical Expert Selection CS 11- 13 / Selection of Individual Component 1 - Maintenance International Individual for IBRD / 84890 Prior Consultant Open 0.00 761,712.00 Canceled 2016-12-25 2017-01-24 2017-05-02 2017-03-25 2018-03-20 Works and Monitoring Technical Assistance Selection Individual Component 1 - Maintenance CS-11 / Financial Specialist IBRD / 84890 Prior Consultant Open 0.00 80,542.50 Signed 2015-11-17 2015-11-17 Works and Monitoring Selection CS 11/2 / Individual Individual Consultant for bidding Component 1 - Maintenance IBRD / 84890 Prior Consultant Open 0.00 125,178.00 Signed 2015-12-22 2015-12-23 document preparation and Works and Monitoring Selection review CS/24 / Dispute Resolution Component 4 - Project Pending IBRD / 84890 Post Direct Selection Direct 100,000.00 0.00 2020-02-11 2020-02-21 2020-04-26 2020-10-23 Expert Management and Audit Implementation Individual CS 13/2 / Procurement Component 4 - Project Under IBRD / 84890 Post Consultant Open 35,000.00 0.00 2020-02-14 2020-02-02 2020-04-02 2020-04-23 2020-05-28 2020-11-24 specialist of PMT Management and Audit Implementation Selection CS18 / TA to support ARA in Project Implementation Individual (procurement/ contract Component 4 - Project IBRD / 84890 Prior Consultant Open 300,000.00 172,976.35 Signed 2020-09-25 2020-12-03 2020-11-13 2021-03-09 2020-12-04 2021-05-25 2021-01-08 2021-05-28 2021-07-07 management, ToRs, Management and Audit Selection monitoring and reporting, etc.) AL-ARA-235219-CS-INDV / Individual Component 3 - Sector Pending Environmental Safeguard IBRD / 84890 Post Consultant Open 0.03 0.00 2021-05-28 2021-07-16 2021-08-06 2021-09-10 2022-03-09 Support Implementation Specialist Selection Individual AL-ARA-235220-CS-INDV / Component 3 - Sector Pending IBRD / 84890 Post Consultant Open 0.03 0.00 2021-05-28 2021-07-16 2021-08-06 2021-09-10 2022-03-09 Social Safeguard Specialist Support Implementation Selection Page 2 18 MONTHS PROCUREMENT PLAN-SSRLP PROJECT Project information: Malawi Social Support for Resilient Livelihood Project - P169198 Project Implementation Agency: National Local Government Finance Committee, Malawi Date of the Procurement Plan: September 2019 Period covered by this Procurement Plan: June 2019 to January 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Disposal of Public Assets Act, 2017 of the Republic of Malawi, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right 1 to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the REDISSE II project): Thresholds*, Procurement Methods, and Prior Review for Substantial Risk Thresholds for Procurement Expenditure Procurement Contracts Subject to No Approaches and Category Method Prior Review / [eq. US$] Methods* [eq. USD] All contracts at or above Open Competition USD10,000,000 are subject to International Market international advertising and the C ≥ 7,000,000 Approach and Direct use of the Bank’s SPDs (or other Contracting documents agreed with the 1 Works Bank). Open Competition National Market 200,000 < C < 7,000,000 None Approach 2 Thresholds for Procurement Expenditure Procurement Contracts Subject to No Approaches and Category Method Prior Review / [eq. US$] Methods* [eq. USD] C ≤ 200,000 RfQ None All contracts at or above Open Competition USD2,000,000 are subject to International Market international advertising and the C ≥ 1,000,000 Approach and Direct use of the Bank’s SPDs (or other Goods, IT and Contracting documents agreed with the 2 non-consulting Bank). services Open Competition National Market 100,000 < C < 1,000,000 None Approach C ≤ 100,000 RfQ None All contracts at or above USD1,000,000 are subject to for international advertising and the C < 200,000 Consulting Services use of the Bank’s SPDs (or other National documents agreed with the shortlist for Bank). 3 selection of All contracts at or above consultant firms for USD1,000,000 are subject to Engineering and international advertising and the C ≤ 300,000 Construction use of the Bank’s SPDs (or other Supervision documents agreed with the Bank). Selection of All values ≥ 300,000 4 Individual All Approaches consultants Training, Based on approved Workshops, This line activity is not subject 5 All Values Annual Work Plan & Study Tours to procurement Review. Budgets (AWPB) by TTL *These thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Other Special Procurement Arrangements: When approaching the national market, as agreed in the Procurement Plan, the Open National Bidding procedure of Public Procurement and Asset Disposal Act 2017 and Regulations (Applicable Version) may be used. The specific Requirements for national open competitive procurement include the following: a.open advertising of the procurement opportunity at the national level; b.the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d.contracts with an appropriate allocation of responsibilities, risks, and liabilities; e.publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g.an effective complaints mechanism; and h.maintenance of records of the Procurement Process. 3 Other national procurement arrangements (other than national open competitive procurement), that may be applied (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply Prequalification. Not expected for the works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Applicable for activities under component 1 on Improving Social and Economic Inclusion, especially those for Enhanced Public Works and Livelihood Programs. Reference to (if any) Project Operational/Procurement Manual: The National Local Government Finance Committee team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/Plan with Procurement Arrangements and Time Schedule: as per the table below: b) PROCUREMENT PLAN Works 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procureme Prequ National Review Expected Expected Comme No. (Description) Cost nt Method/ alifica Prefere by bid Contract nts US$ Arrangeme tion nce Bank opening Signature million nt (yes/n (yes/no) (Prior / date Date o) Post) 1. Minor works for 350,000.0 Open, Post No Post Septembe October maintenance of 0 National, r 11, 2020 16, 2020 District RFB SCTP/EPWP offices 2. Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procureme Prequa Nation Review Expected Expected Com No. (Description) Cost nt Method/ lificatio al by bid Contract ment US$ million Arrangeme n Prefer Bank opening Signatur s nt (yes/no ence (Prior / date e Date ) (yes/n Post) o) IDA 1. Procurement of 1,800,009.0 Open, Post No Post September October 27 motor 0 Internation 11, 2020 16, 2020 vehicles al, RFB 4 2. Procurement of 248,000.00 Limited, Post No Post September October 31 motor cycles National, 11, 2020 16, 2020 RFQ 3. Procurement of 1,659,750.4 Open, Post No Post July 24, August IEC Materials 0 Internation 2020 14, 2020 al, RFB 4. Procurement of 696,145.00 Open, Post No Post August 07, August office furniture, National, 2020 31, 2020 ICT equipment RFB and system upgrades 5. Procurement of 1,388,889.0 Open, Post No Post September Septembe materials, inputs 0 Internation 9, 2020 r 20, 2020 and tools for al, RFB Expanded Public Works Programme (EPwP) 6. Procurement of 1,084,698.0 CDD Post No Post January 20, February Household 0 Details to 2021 15, 2021 Livelihood and be Cooperative elaborated Assets following in the PIM CDD Approach in accordanc e with Annex XII, paragraph 6.10 of the Procureme nt Regulation s 7. Procurement of 10,000.00 Limited, Post No Post September October interactive National 11, 2020 16, 2020 mobile tracking RFQ system GRiF Trust Fund 8. Procurement of 500,000.00 Open, Post No Post February March 30, ICT system National, 15, 2021 2021 adaptation RFB Modules for using MIS for scalable SCTP 9. Procurement of 2,200,000.0 Open, Prior No Prior October 15, November ICT system 0 Internation 2020 30, 2020 upgrades for UBR al, for scalable SCTP RFB 10. Procurement of 700,000.00 Open, Post No Post November December ICT Equipment National, 15, 2020 30, 2020 for UBR data RFB collection for scalable SCTP 11. Procurement of 1,000,000.0 Open, Post No Prior April 15, May 30, E-payment 0 2021 2021 5 Services Internation ((Financial al, inclusion drive RFB (bank accounts or mobile money registration)) for scalable SCTP 12. Procurement of 500,000.00 Open, Post No Post April 15, May 30, adaptable National, 2021 2021 citizens’ RFB engagement/GR M to capture information specific to the scalable SCTP 13. Parametric 10,000,000. Open, Prior No Prior Not part of insurance 00 Internation the 18 coverage against al, months drought RFB plan 14. Consultancy Services 1 2 3 4 5 6 7 8 Ref. No. Description of Assignment Estimate Selection Review Expected Expected Comme d Method/ by date of Contract nts Cost Arrangeme Bank proposal Signature US$ nt (Prior / submissio Date Post) n IDA 1. Consulting services to carry 146,667.0 Open, Post August 30, Sept 20, out annual external audits 0 National 2021 2021 LCBS 2. Consulting services to carry 320,000.0 Open, Post March 31, April 21, out Baseline, Mid-line and End- 0 National 2020 2020 line surveys. QCBS 3. Consulting services to carry out 40,000.00 Open, Post Not part of Project Mid-Term Review National, 18 Months INDV plan 4. Consulting services to develop 140,000.0 Limited, Post March April 2021 MNSSP Bill 0 National, 2021 INDV 5. Consulting services to carry out 89,400.00 Open, Post March 31, April 21, Evidence Generation Survey National, 2020 2020 CQS GRiF Trust Fund 6. Consulting services to support 300,000.0 Open, Post August 20, September scalable SCTP 0 National, 2020 25, 2020 CQS 6 7. Consulting services to provide 100,000.0 Open, Post August 20, September support in legal and regulatory 0 National, 2020 25, 2020 work in setting up the scalable CQS SCTP 8. Consulting services for Data 1,000,000 Open, Prior July 25, August 20, Collection to Support SCTP .00 Internation 2020 2020 al, QCBS 9. Consulting services for the 1,000,000 Open, Prior July 15, August 30, provision of Insurance .00 Internation 2021 2021 Brokerage services al, CQS Training and Workshop (Training & Workshop activities are subject to TTL clearance) Estimat Estimated Expected Comment Ref. Training, workshop and study s ed Cost Duration Training/work No. tours (US$) (Days) shop Date 1. Evidence Building for Social 2 weeks September Planned for protection plus 30,000.0 2020 6 0 participant s 2. Learning visit on E-payment 1 week July 2020 Planned for 20,000.0 6 0 participant s 3. Procurement and Contract 2 weeks July 2020 Planned for Management 30,000.0 4 0 participant s 4. Environmental and Social 2 weeks November 2020 Planned for safeguards Management 26,000.0 3 0 participant s 5. Financial management for donor- 2 weeks August 2020 Planned for funded projects 18,000.0 2 0 participant s 6. Data analysis for Social Registry or 2 weeks March 2020 Planned for Unified Beneficiary Registry (UBR) 50,000.0 8 and Scalable Safety nets 0 participant s 7. Computerized accounting system 2 weeks April 2021 Planned for (Tompro 2) 20,000.0 2 0 participant s 8. Core course on Social protection or 2 weeks October 2020 Planned for safety nets 42,000.0 5 0 participant s 9. Learning visit on Economic 1 week December 2020 Planned for inclusion 25,000.0 6 0 participant s 10. Shock sensitive social protection 1week August 2020 Planned for trainings and workshops 55,000.0 30 0 7 participant s 11. IFMIS and MIS trainings and 2 weeks February 2021 Planned for workshops 60,000.0 20 0 participant s GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) the salaries of locally contracted support staff of the Project entities and units involved in Project implementation (excluding civil servants) and state contributions thereon; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance and insurance; (iv) communication technology (including, without limitation, internet and telephone) and maintenance of equipment; (v) rental expenses and utilities; (vi) building security and maintenance; (vii) translations services, photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 8 We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 9 c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 10 PROCUREMENT Malawi : Social Support for Resilient Livelihoods Project PLAN General Information Country: Malawi Bank’s Approval Date of the Original Procurement Plan: 2020-07-13 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169198 GPN Date: 2021-01-12 Project Name: Social Support for Resilient Livelihoods Project Loan / Credit No: IDA / D5300 N Executing Agency(ies): ational Local Government Finance Committee WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-201773-GO-RFB Under Improving Social and Single Stage - One / Procurement of 12No. Motor IDA / D5300 Post Request for Bids Open - National 770,000.00 973,475.11 Implementati 2020-12-15 2021-02-15 2020-12-20 2021-03-17 2021-01-31 2021-04-09 2021-03-02 2021-05-21 2021-04-06 2021-05-18 Economic Inclusion Envelope Vehicles on MW-NLGFC-183305-GO-RFQ / Procurement of office Improving Social and Request for Single Stage - One IDA / D5300 Post Limited 4,300.00 6,790.46 Completed 2020-12-20 2021-01-22 2021-01-10 2021-05-10 2021-01-24 2021-05-25 furniture for Livelihoods Economic Inclusion Quotations Envelope Support MW-NLGFC-183310-GO-RFQ / Procurement of office Improving Social and Request for Single Stage - One IDA / D5300 Post Limited 42,000.00 47,189.31 Signed 2021-01-04 2021-01-27 2021-03-01 2021-05-10 2021-08-28 equipment for Livelihoods Economic Inclusion Quotations Envelope Support MW-NLGFC-209692-GO-RFB Under Improving Social and Single Stage - One / Procurement of 31No Motor IDA / D5300 Post Request for Bids Open - National 240,000.00 0.00 Implementati 2021-04-06 2021-04-06 2021-04-10 2021-05-10 2021-05-03 2021-05-17 2021-05-25 2021-06-06 2021-07-18 Economic Inclusion Envelope Cycles for Livelihood Support on MW-NLGFC-201743-GO- RFQ. / Procurement of a Improving Social and Request for Single Stage - One Procurement of 2021 IDA / D5300 Post Limited 35,000.00 23,592.19 Signed 2020-12-06 2021-01-14 2021-01-31 2021-03-15 2021-07-30 Economic Inclusion Quotations Envelope Calendars, Diaries and Notebooks MW-NLGFC-201743-GO-RFQ / Procurement of 2021 Improving Social and Request for Single Stage - One IDA / D5300 Post Limited 35,000.00 0.00 Canceled 2020-12-19 2021-01-14 2021-02-19 2021-03-05 Calendars, diaries and Economic Inclusion Quotations Envelope notebooks MW-NLGFC-240248-GO-RFQ Capacity Building and Pending / 1No heavy duty Request for Single Stage - One IDA / D5300 Institutional Strengthening Post Limited 20,000.00 0.00 Implementati 2021-06-30 2021-07-15 2021-08-05 printer/photocopier for the Quotations Envelope Support on UBR NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-237562-NC-RFB / Provision of Electronic Under Payment Services for Social Improving Social and Single Stage - One IDA / D5300 Post Request for Bids Open - National 200,000.00 0.00 Implementati 2021-06-14 2021-06-14 2021-06-19 2021-07-19 2021-08-18 2021-09-22 2023-09-22 Cash Transfer Programme Economic Inclusion Envelope on (SCTP) in Blantyre, Nkhotakota and Karonga Districts CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-207101-CS-CQS Consultant Improving Social and Under / Baseline survey for IDA / D5300 Post Qualification 30,000.00 0.00 2020-12-16 2020-12-14 2020-12-30 2021-05-28 2021-01-29 2021-02-19 2021-04-20 Economic Inclusion Implementation Livelihoods support Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-LDF-TST-255157-CS- Capacity Building and Individual INDV. / Procurement of a IDA / D5300 Institutional Strengthening Prior Consultant Open 42,000.00 0.00 Under Review 2021-03-21 2021-03-17 2021-05-09 2021-05-28 2021-05-30 2021-07-04 2021-12-31 Procurement Consultant Support Selection Page 1 PROCUREMENT PLAN (Textual Part) Project information: Liberia Recovery of Economic Activity for Liberian Informal Sector Employment Project (P174417). Project Implementation agency: Ministry of Youth and Sports (MYS) and Liberia Agency for Community Empowerment (LACE). Date of the Procurement Plan: March 12, 2021. Period covered by this Procurement Plan: March 12, 2021-June 30, 2024. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018 and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable. Works: Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable. Other Relevant Procurement Information. The project may use the CDD procurement under this project. If required, CDD procurement manual will be produced by the project. PROCUREMENT Liberia : Recovery of Economic Activity for Liberian Informal Sector Employment Project PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2021-05-27 2021-05-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174417 GPN Date: Project Name: Recovery of Economic Activity for Liberian Informal Sector Employment Project Loan / Credit No: IDA / 68480 Ministry of Youth and Sport Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-236717-GO-RFB / Temporary Employment Tools and Equipment Pending Support and Employability Single Stage - One (Wheelbarrows, Shovel, IDA / 68480 Post Request for Bids Open - National 727,250.00 0.00 Implementati 2021-08-16 2021-08-21 2021-10-02 2021-11-01 2021-12-06 2021-12-31 Development for Vulnerable Envelope Protective equipment, Paint, on Workers Brushes etc.) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity Building and Project Consultant LR-MOYS-236791-CS-CQS / Pending IDA / 68480 Implementation and Post Qualification Open - National 30,000.00 0.00 2021-06-21 2021-07-12 2021-08-25 2021-09-24 2021-10-29 2022-04-27 Third Party Monitoring Implementation Coordination Selection Capacity Building and Project Consultant LR-MOYS-236720-CS-CQS / Pending IDA / 68480 Implementation and Post Qualification Open - National 30,000.00 0.00 2022-06-30 2022-07-21 2022-09-03 2022-10-03 2022-11-07 2023-05-06 Annual Beneficiary Survey Implementation Coordination Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity Building and Project LR-MOYS-234637-CS-CDS / Under IDA / 68480 Implementation and Post Direct Selection Direct 74,523.24 0.00 2021-06-01 2021-05-31 2021-06-11 2021-08-15 2022-12-31 Project Coordinator Implementation Coordination Capacity Building and Project Individual LR-MOYS-234635-CS-INDV Under IDA / 68480 Implementation and Post Consultant Open 33,000.00 0.00 2021-06-01 2021-05-31 2021-07-20 2021-08-10 2021-09-14 2022-12-31 / Environmental Officer Implementation Coordination Selection LR-MOYS-234642-CS-INDV Capacity Building and Project Individual Under / Monitoring and Evaluation IDA / 68480 Implementation and Post Consultant Open 33,000.00 0.00 2021-06-01 2021-05-30 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Implementation Officer Coordination Selection Capacity Building and Project LR-MOYS-236709-CS-CDS / Under IDA / 68480 Implementation and Prior Direct Selection Direct 36,000.00 0.00 2021-06-01 2021-05-31 2021-06-11 2021-08-15 2022-12-31 Procurement Officer Implementation Coordination LR-MOYS-236721-CS-INDV Capacity Building and Project Individual Under / Public Works And IDA / 68480 Implementation and Post Consultant Open 36,000.00 0.00 2021-06-01 2021-05-30 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Implementation Employability Officer Coordination Selection Page 1 PROCUREMENT PLAN (Textual Part) Project information: Liberia Recovery of Economic Activity for Liberian Informal Sector Employment Project (P174417). Project Implementation agency: Ministry of Youth and Sports (MYS) and Liberia Agency for Community Empowerment (LACE). Date of the Procurement Plan: March 12, 2021. Period covered by this Procurement Plan: March 12, 2021-June 30, 2024. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018 and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable. Works: Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable. Other Relevant Procurement Information. The project may use the CDD procurement under this project. If required, CDD procurement manual will be produced by the project. PROCUREMENT Liberia : Recovery of Economic Activity for Liberian Informal Sector Employment Project PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2021-05-27 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174417 GPN Date: Project Name: Recovery of Economic Activity for Liberian Informal Sector Employment Project Loan / Credit No: IDA / 68480 Liberia Agency for Community Empowerment Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-LACE-236726-CS-CQS / Grant Support to Vulnerable Consultant Pending Service Provider (Existing IDA / 68480 Households to Revive or Start Post Qualification Open - National 126,000.00 0.00 2021-08-05 2021-08-26 2021-10-09 2021-11-08 2021-12-13 2022-06-11 Implementation businesses) Small Businesses Selection LR-LACE-236724-CS-CQS / Grant Support to Vulnerable Consultant Pending Service Provider (New IDA / 68480 Households to Revive or Start Post Qualification Open - National 84,000.00 0.00 2022-06-06 2022-06-27 2022-08-10 2022-09-09 2022-10-14 2023-04-12 Implementation businesses) Small Businesses Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity Building and Project LR-LACE-234656-CS-CDS / Under IDA / 68480 Implementation and Post Direct Selection Direct 63,000.00 0.00 2021-06-01 2021-05-31 2021-06-11 2021-08-15 2022-12-31 Deputy Project Coordinator Implementation Coordination Capacity Building and Project Individual LR-LACE-234650-CS-INDV / Under IDA / 68480 Implementation and Post Consultant Open 36,000.00 0.00 2021-06-01 2021-05-31 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Financial Management Officer Implementation Coordination Selection Capacity Building and Project Individual LR-LACE-234652-CS-INDV / Under IDA / 68480 Implementation and Post Consultant Open 33,000.00 0.00 2021-06-01 2021-05-31 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Operations Officer Implementation Coordination Selection Capacity Building and Project Individual LR-LACE-234654-CS-INDV / Under IDA / 68480 Implementation and Post Consultant Open 33,000.00 0.00 2021-06-01 2021-05-31 2021-07-20 2021-08-10 2021-09-14 2022-12-31 Social Safeguard Officer Implementation Coordination Selection Capacity Building and Project Individual LR-LACE-236728-CS-INDV / Pending IDA / 68480 Implementation and Post Consultant Open 18,000.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-12-31 GRM/Project Assistant Implementation Coordination Selection Page 1 Integrated Habitat and Housing Project (P159929) Argentina, IBRD/IDA Team Leader(s): Catherine Lynch, John Morton , PROCUREMENT Argentina : Integrated Habitat and Housing Project PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2018-01-29 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159929 GPN Date: 2018-04-26 Project Name: Integrated Habitat and Housing Project Loan / Credit No: IBRD / 87120 M Executing Agency(ies): inistry of Territorial Development and Habitat WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AR-MININTERIOR-123537- Under CW-RFB / Programa de Integrated Habitat Single Stage - One 2020-12- IBRD / 87120 Post Request for Bids Open - National 4,402,758.25 0.00 Implementat 2019-08-19 2019-08-15 2019-08-24 2019-10-05 2019-12-06 2019-11-04 2019-12-09 Mejoramiento Barrial Villa El Improvement Envelope 03 ion Libertador, Córdoba AR-MININTERIOR-130302- Under CW-RFB / Proyecto Integral La Integrated Habitat Single Stage - One 2021-12- IBRD / 87120 Post Request for Bids Open - National 8,568,105.87 0.00 Implementat 2019-09-20 2019-09-26 2019-09-25 2019-11-06 2019-10-31 2019-12-06 2020-01-10 Favorita – 5° Etapa, Prov. Improvement Envelope 30 ion Mendoza AR-MININTERIOR-145719- CW-RFB / Proyecto de Mejoramiento Barrial. Barrio Villa Banana, Rosario - Sector Pending Integrated Habitat Single Stage - One 2022-02- 2, entre las calles Servando IBRD / 87120 Post Request for Bids Open - National 4,393,724.00 0.00 Implementat 2020-11-02 2020-11-07 2020-12-19 2021-01-18 2021-02-22 Improvement Envelope 17 Bayo, Galvez , Avellaneda y ion Virasoro / Sector 3, entre las calles Servando Bayo, Virasoro, Avellaneda y Rueda AR-MININTERIOR-145718- CW-RFB / Proyecto de Under Integrated Habitat Single Stage - One 2022-07- Mejoramiento Barrial. Barrio IBRD / 87120 Post Request for Bids Open - National 2,909,217.26 0.00 Implementat 2020-10-01 2020-09-23 2020-10-06 2020-11-17 2020-12-17 2021-01-21 Improvement Envelope 15 Villa Banana, Rosario - Sector ion 1 AR-MININTERIOR-202138- Pending Integrated Habitat Single Stage - One 2022-12- CW-RFB / Proyecto Argüello- IBRD / 87120 Post Request for Bids Open - National 5,599,055.00 0.00 Implementat 2021-02-26 2021-03-08 2021-03-25 2021-05-09 2021-06-08 Improvement Envelope 21 Córdoba ion AR-MININTERIOR-207070- CW-RFB / Construcción de “Infraestructura Básica de Pending Integrated Habitat Single Stage - One 2022-07- Servicios, Equipamiento IBRD / 87120 Post Request for Bids Open - National 1,837,630.00 0.00 Implementat 2021-03-04 2021-03-05 2021-04-05 2021-05-20 2021-06-19 Improvement Envelope 05 Urbano y Obras de ion Mitigación Ambiental. EL TROPEZÓN”, Córdoba AR-MININTERIOR-142823- Pending CW-RFB / Proyecto B° Integrated Habitat Single Stage - One 2022-07- IBRD / 87120 Post Request for Bids Open - National 4,092,715.70 0.00 Implementat 2021-02-26 2021-03-31 2021-04-30 2021-05-30 2021-07-04 Congreso y Progreso ETAPA II Improvement Envelope 04 ion - Mendoza AR-MININTERIOR-218983- CW-RFB / “Construcción de Infraestructura Pública, Pending Equipamiento Urbano y Integrated Habitat Single Stage - One 2022-07- IBRD / 87120 Post Request for Bids Open - National 1,835,444.00 0.00 Implementat 2021-03-24 2021-03-29 2021-04-28 2021-06-12 2021-07-17 Comunitario – Barrio Flores y Improvement Envelope 17 ion Olivares – Etapa 2” ciudad de Mendoza, Provincia de Mendoza Pending AR-MININTERIOR-146775- Integrated Habitat Single Stage - One 2022-08- IBRD / 87120 Post Request for Bids Open - National 1,924,335.08 0.00 Implementat 2021-03-31 2021-04-26 2021-05-26 2021-06-26 2021-08-06 CW-RFB / Proyecto La Chola Improvement Envelope 31 ion AR-MININTERIOR-225693- Pending Integrated Habitat Single Stage - One 2022-07- CW-RFB / PERDRIEL NORTE IBRD / 87120 Post Request for Bids Open - National 2,394,114.00 0.00 Implementat 2021-03-26 2021-03-31 2021-04-30 2021-06-14 2021-07-14 Improvement Envelope 09 ETAPA 1 ion AR-MININTERIOR-223172- CW-RFB / Obras de Pending infraestructura, saneamiento y Integrated Habitat Single Stage - One 2022-07- IBRD / 87120 Post Request for Bids Open - National 3,400,897.00 0.00 Implementat 2021-03-19 2021-04-01 2021-05-01 2021-06-15 2021-07-13 espacio público en el sector Improvement Envelope 29 ion Noroeste de la Ciudad de Santa Fe. AR-MININTERIOR-202142- Pending CW-RFB / Proyecto Rumy- Integrated Habitat Single Stage - One 2022-06- IBRD / 87120 Post Request for Bids Open - National 3,466,463.00 0.00 Implementat 2021-01-18 2021-03-05 2021-04-05 2021-05-20 2021-06-19 Loma de la Cruz, La Calera Improvement Envelope 14 ion Córdoba AR-MININTERIOR-201160- National CW-RFB / Proyecto Procurement Pending Integrated Habitat Single Stage - One 2022-10- Confluencia Lote Z1-Neuquén IBRD / 87120 Post Request for Bids Open - National Document - 1 4,540,759.64 0.00 Implementat 2021-02-25 2021-04-22 2021-05-22 2021-06-21 2021-07-31 Improvement Envelope 24 - Etapa 1: Red cloacal y Envelope process ion completamiento red de gas (Non Bank-SPD) National AR-MININTERIOR-201346- Procurement Pending CW-RFB / Proyecto Integrated Habitat Single Stage - One 2022-11- IBRD / 87120 Post Request for Bids Open - National Document - 1 2,296,896.91 0.00 Implementat 2021-02-23 2021-04-22 2021-05-22 2021-07-06 2021-07-28 Confluencia. Toma la Familia- Improvement Envelope 05 Envelope process ion Neuquén (Non Bank-SPD) AR-MININTERIOR-142607- CW-RFB / Proyecto integral Integrated Habitat Single Stage - One 2022-06- IBRD / 87120 Post Request for Bids Open - National 1,365,563.00 0.00 Canceled 2020-11-09 2021-03-29 2020-11-16 2020-12-16 2021-02-14 2021-03-31 Asentamiento Papa Francisco Improvement Envelope 24 - Catamarca National AR-MDTH-237083-CW-RFB / Procurement Pending Proyecto Integral Integrated Habitat Single Stage - One 2022-11- IBRD / 87120 Post Request for Bids Open - National Document - 1 1,257,560.00 0.00 Implementat 2021-06-03 2021-06-08 2021-06-29 2021-07-29 2021-08-31 Asentamiento Papa Francisco Improvement Envelope 24 Envelope process ion - Catamarca (Segundo (Non Bank-SPD) Llamado) Page 1 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-MININTERIOR-116118- Request for Single Stage - One NC-RFQ / Foro de Vivienda IBRD / 87120 Institutional Strengthening Post Limited 2,130.00 1,455.53 Signed 2019-05-27 2019-05-24 2019-06-03 2019-05-31 2019-06-13 Quotations Envelope Sustentable AR-MININTERIOR-125960- NC-RFQ / Provisión de Request for Single Stage - One servicio de catering. IBRD / 87120 Institutional Strengthening Post Limited 600.00 1,345.89 Signed 2019-08-02 2019-08-02 2019-08-06 2019-08-07 2019-08-11 Quotations Envelope Capacitación Mejor Hogar Sustentable AR-MININTERIOR-135200- NC-RFQ / Servicio de cobertura audiovisual - Request for Single Stage - One Capacitación Sistema Solar IBRD / 87120 Institutional Strengthening Post Limited 1,300.00 740.65 Signed 2019-09-26 2019-09-30 2019-10-03 2019-10-09 2019-10-10 Quotations Envelope Térmico en Propiedad Horizontal y Beneficios Fiscales AR-MININTERIOR-142274- Request for Single Stage - One NC-RFQ / Capacitación Sello IBRD / 87120 Institutional Strengthening Post Limited 1,800.00 679.57 Signed 2019-10-25 2019-10-25 2019-10-29 2019-11-06 2019-11-03 Quotations Envelope de Vivienda Sustentable AR-MININTERIOR-146762- NC-RFQ / Contratación Request for Single Stage - One IBRD / 87120 Institutional Strengthening Post Limited 2,500.00 1,633.44 Signed 2019-11-23 2019-11-07 2019-11-27 2019-11-14 2019-12-02 servicio de catering - Sello Quotations Envelope Vivienda Sustentable Mendoza AR-MININTERIOR-140568- NC-RFQ / Impresión de Request for Single Stage - One IBRD / 87120 Institutional Strengthening Post Limited 5,900.00 0.00 Canceled 2019-10-26 2019-11-02 2019-11-09 publicaciones Secretaría de Quotations Envelope Vivienda CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UEC-60404-CS-QCBS / Quality And Cost- Formulación Proyectos IBRD / 87120 Institutional Strengthening Prior Open - International 5,600,000.00 244,188.38 Signed 2018-04-30 2018-05-15 2018-05-01 2018-06-28 2018-12-06 2018-07-26 2019-01-25 2018-08-25 2019-02-26 2018-09-29 2019-03-29 2018-11-03 2019-04-17 2020-11-02 Based Selection Ejecutivos Integrales AR-UEC-40792-CS-QCBS / Servicio de Consultoría para el Quality And Cost- IBRD / 87120 Institutional Strengthening Post Open - National 360,000.00 224,659.55 Signed 2018-05-15 2018-05-30 2018-06-05 2018-07-19 2019-01-15 2018-08-16 2019-02-15 2018-10-15 2019-04-17 2018-11-19 2019-05-08 2018-12-24 2019-06-24 2019-09-20 Apoyo a la Implementación Based Selection del SIGEBE AR-UEC-58982-CS-CQS / Consultant Servicio de Consultoría para IBRD / 87120 Institutional Strengthening Post Qualification Open - National 20,800.00 0.00 Canceled 2018-04-25 2018-04-03 2018-05-16 2018-08-14 2018-08-29 2018-10-13 2020-10-12 Facilitación de Mesa de Selection Diálogo AR-MININTERIOR-103445-CS- CQS / Capacitación a Técnicos Diagnosticadores y Quality And Cost- IBRD / 87120 Institutional Strengthening Post Open - National 100,500.00 0.00 Canceled 2019-03-07 2019-03-01 2019-03-28 2019-05-11 2019-06-08 2019-07-08 2019-08-12 2019-09-16 2020-09-15 Sustentabilizadores del Plan Based Selection Nacional de Sustentabilización de Viviendas AR-MININTERIOR-103429-CS- CQS / Capacitación de Quality And Cost- IBRD / 87120 Institutional Strengthening Post Open - National 150,000.00 0.00 Canceled 2019-03-07 2019-03-01 2019-03-28 2019-05-11 2019-06-08 2019-07-08 2019-08-12 2019-09-16 2020-09-15 Técnicos y funcionarios en Based Selection Gestión de Suelo AR-MININTERIOR-116378-CS- QCBS / Evaluación del Quality And Cost- IBRD / 87120 Institutional Strengthening Post Open - National 125,000.00 0.00 Canceled 2019-05-30 2019-06-20 2019-08-03 2019-08-31 2019-09-30 2019-11-04 2019-12-09 2020-12-03 Programa Mejor Hogar Gas - Based Selection Secretaría de Vivienda AR-MININTERIOR-103434-CS- QCBS / Formulación de Quality And Cost- IBRD / 87120 Institutional Strengthening Post Open - National 350,000.00 0.00 Canceled 2019-03-11 2019-03-01 2019-04-01 2019-05-15 2019-06-12 2019-07-12 2019-08-25 2019-09-29 2021-09-18 Proyectos Ejecutivos de Based Selection Desarrollo Urbano AR-MININTERIOR-103499-CS- CQS / Evaluación de Quality And Cost- Resultados en Hogares IBRD / 87120 Institutional Strengthening Post Open - National 156,500.00 0.00 Canceled 2019-03-07 2019-03-01 2019-03-28 2019-05-11 2019-10-15 2019-06-08 2019-11-22 2019-07-08 2019-08-12 2019-09-16 2020-09-15 Based Selection Beneficiarios de Proyectos de Vivienda Social INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UEC-40795-CS-INDV / Individual Consultor para Proyectos PPP- IBRD / 87120 Institutional Strengthening Post Consultant Limited 40,500.00 14,311.74 Terminated 2018-05-02 2018-04-11 2018-05-03 2018-04-13 2018-05-07 2018-04-25 2018-05-15 2018-05-01 2019-05-15 Especialista para Evaluación Selection Socio- Económico AR-UEC-60577-CS-INDV / Individual Consultor Especialista IBRD / 87120 Institutional Strengthening Post Consultant Limited 17,223.40 29,023.38 Signed 2018-04-25 2018-02-19 2018-04-26 2018-02-21 2018-04-27 2018-03-28 2018-05-02 2018-04-01 2018-12-31 Ambiental Selection Page 2 Individual AR-UEC-60581-CS-INDV / Pending IBRD / 87120 Institutional Strengthening Post Consultant Limited 12,100.60 0.00 2018-04-25 2018-04-26 2018-04-27 2018-05-02 2018-12-31 Consultor Especialista Obra Implementation Selection AR-UEC-60585-CS-INDV / Individual Pending Consultor Especialista IBRD / 87120 Institutional Strengthening Post Consultant Limited 27,112.15 0.00 2018-04-25 2018-04-26 2018-04-27 2018-05-02 2018-12-31 Implementation Contable Selection AR-UEC-60602-CS-INDV / Individual Pending Consultor Especialista IBRD / 87120 Institutional Strengthening Post Consultant Limited 12,100.60 0.00 2018-04-25 2018-04-26 2018-04-27 2018-05-02 2018-12-31 Implementation Evaluación Selection Individual AR-UEC-40794-CS-INDV / IBRD / 87120 Institutional Strengthening Post Consultant Limited 23,000.00 33,732.61 Terminated 2018-02-09 2018-01-23 2018-02-10 2018-01-25 2018-02-14 2018-02-26 2018-03-01 2018-03-01 2018-12-31 Consultor para el CAT Selection AR-UEC-40796-CS-INDV / Individual Pending Consultor Especialista IBRD / 87120 Institutional Strengthening Post Consultant Limited 23,000.00 0.00 2018-02-09 2018-02-10 2018-02-14 2018-03-01 2018-12-31 Implementation Ambiental Selection AR-UEC-60614-CS-CDS / Evaluación Integral de IBRD / 87120 Institutional Strengthening Post Direct Selection Direct 270,000.00 196,166.21 Signed 2018-05-02 2018-04-09 2018-05-14 2018-07-12 2018-07-12 2018-11-16 2019-04-08 Programa de la Secretaria de Vivienda AR-UEC-44113-CS-INDV / Individual Consultor para la Ley Nacional IBRD / 87120 Institutional Strengthening Post Consultant Limited 20,000.00 0.00 Canceled 2018-01-19 2018-02-09 2018-02-16 2018-03-01 2018-10-31 de Vivienda - Arquitecto Selection Urbanista Senior AR-UEC-44112-CS-INDV / Individual Consultor para la Ley Nacional IBRD / 87120 Institutional Strengthening Post Consultant Limited 20,000.00 0.00 Canceled 2018-01-19 2018-02-09 2018-02-16 2018-03-01 2018-10-31 de Vivienda - Abogado de Selection Derecho Urbanístico Senior AR-UEC-60620-CS-INDV / Individual Consultor para Proyectos PPP- Under IBRD / 87120 Institutional Strengthening Post Consultant Limited 37,125.00 0.00 2018-06-01 2018-04-06 2018-06-02 2018-06-06 2018-06-15 2019-05-11 Especialista para Evaluación Implementation Selection financiera AR-UEC-44114-CS-INDV / Individual Integrated Habitat Especialista en Ingeniería IBRD / 87120 Post Consultant Limited 23,000.00 45,819.21 Signed 2018-05-15 2018-01-23 2018-05-20 2018-01-25 2018-05-23 2018-02-26 2018-05-28 2018-03-01 2019-04-23 Improvement Hidráulica Selection AR-UEC-44800-CS-CDS / Consultoría para la IBRD / 87120 Institutional Strengthening Post Direct Selection Direct 100,000.00 100,000.00 Signed 2018-04-27 2018-04-03 2018-05-06 2018-07-13 2018-06-26 2019-02-07 2018-12-23 Construcción del Índice Multidimensional del Hábitat AR-UEC-66562-CS-CDS / Servicio de Consultaría para IBRD / 87120 Institutional Strengthening Post Direct Selection Direct 20,800.00 14,672.00 Signed 2018-06-18 2018-04-09 2018-06-28 2018-07-12 2018-09-01 2018-12-17 2019-02-28 Facilitación de Mesa de Diálogo AR-UEC-67616-CS-INDV / Responsable Técnico Individual estructuración de proyectos IBRD / 87120 Institutional Strengthening Post Consultant Limited 50,000.00 37,932.41 Signed 2018-06-21 2018-07-03 2018-06-25 2018-07-04 2018-06-26 2018-07-05 2018-07-02 2018-07-10 2018-12-31 con Participación Público Selection Privada AR-UEC-67617-CS-INDV / Especialista Legal para la Individual elaboración, implementación IBRD / 87120 Institutional Strengthening Post Consultant Limited 47,000.00 24,190.22 Completed 2018-06-22 2018-07-03 2018-06-25 2018-07-04 2018-06-26 2018-07-05 2018-07-02 2018-07-10 2018-12-31 2019-12-31 y seguimiento de la Ley Selection Nacional de Vivienda AR-UEC-67618-CS-INDV / Individual Especialista en Comunicación IBRD / 87120 Institutional Strengthening Post Consultant Limited 47,000.00 36,415.49 Completed 2018-06-22 2018-07-03 2018-06-25 2018-07-04 2018-06-26 2018-07-04 2018-07-02 2018-07-10 2018-12-31 2019-12-31 Institucional Selection AR-UEC-67619-CS-INDV / Individual Responsable Técnico IBRD / 87120 Institutional Strengthening Post Consultant Limited 38,000.00 31,787.33 Signed 2018-06-22 2018-07-03 2018-06-26 2018-07-04 2018-06-27 2018-07-05 2018-07-02 2018-07-10 2018-12-31 Componentes 1 y 3 del Selection Préstamo BIRF 8712-AR AR-UEC-67620-CS-INDV / Individual Especialista en marketing IBRD / 87120 Institutional Strengthening Post Consultant Limited 36,000.00 10,135.54 Terminated 2018-06-22 2018-07-03 2018-06-25 2018-07-04 2018-06-26 2018-07-05 2018-07-02 2018-07-09 2018-12-31 digital y comunicación Selection AR-UEC-67621-CS-INDV / Individual Responsable de Seguimiento y IBRD / 87120 Institutional Strengthening Post Consultant Limited 31,000.00 7,845.02 Completed 2018-06-22 2018-07-03 2018-06-25 2018-07-04 2018-06-26 2018-07-05 2018-07-02 2018-08-01 2018-12-31 2018-12-31 Control de Proyectos de Selection Vivienda Social AR-UEC-69404-CS-INDV / Individual Analista de Planificación de IBRD / 87120 Project Management Post Consultant Limited 82,363.69 31,785.28 Signed 2018-07-12 2018-07-09 2018-07-13 2018-07-10 2018-07-14 2018-07-12 2018-07-16 2018-07-16 2021-12-31 Programas Selection AR-UEC-69406-CS-INDV / Individual Asistente en Gestión y IBRD / 87120 Project Management Post Consultant Limited 58,459.89 25,868.82 Signed 2018-07-12 2018-07-09 2018-07-13 2018-07-10 2018-07-14 2018-07-12 2018-07-16 2018-07-16 2021-12-31 Administración de Recursos Selection Humanos Individual AR-UEC-69415-CS-INDV / IBRD / 87120 Project Management Post Consultant Open 51,590.50 11,073.86 Signed 2018-07-12 2018-07-09 2018-07-13 2018-07-10 2018-07-14 2018-07-12 2018-07-16 2018-07-16 2021-12-31 Auxiliar Administrativo Selection Individual AR-UEC-69429-CS-INDV / IBRD / 87120 Project Management Post Consultant Open 55,282.21 8,042.01 Terminated 2018-07-12 2018-07-09 2018-07-13 2018-07-10 2018-07-14 2018-07-12 2018-07-16 2018-07-16 2021-12-31 Asistente Administrativo Selection AR-UEC-69431-CS-INDV / Individual Especialista en Formulación y IBRD / 87120 Project Management Post Consultant Limited 82,777.89 28,556.23 Signed 2018-07-12 2018-07-09 2018-07-13 2018-07-10 2018-07-14 2018-07-12 2018-07-16 2018-07-16 2021-12-31 Ejecución de Proyectos Selection Page 3 AR-UEC-69436-CS-INDV / Especialista en métodos Individual cuali/cuantitativos de IBRD / 87120 Project Management Post Consultant Limited 71,483.00 27,852.11 Signed 2018-07-17 2018-07-21 2018-07-23 2018-07-22 2018-08-01 2018-08-01 2021-12-31 monitorio y evaluación del Selection proyectos AR-UEC-69442-CS-INDV / Individual Analista de Planificación y IBRD / 87120 Project Management Post Consultant Limited 68,928.00 35,298.72 Terminated 2018-07-17 2018-07-09 2018-07-21 2018-07-10 2018-07-22 2018-07-11 2018-08-01 2018-07-16 2021-12-31 Monitoreo de contratos Selection Individual AR-UEC-69448-CS-INDV / Integrated Habitat Pending IBRD / 87120 Post Consultant Limited 14,375.00 0.00 2018-07-17 2018-07-23 2018-07-25 2018-08-01 2019-12-31 Auxiliar Social Improvement Implementation Selection AR-UEC-69428-CS-INDV / Individual Consultor de Apoyo en IBRD / 87120 Project Management Post Consultant Limited 72,759.43 29,967.99 Signed 2018-07-12 2018-07-09 2018-07-13 2018-07-10 2018-07-14 2018-07-11 2018-07-16 2018-07-16 2021-12-31 Adquisiciones. Normativa Selection Nacional AR-UEC-69677-CS-INDV / Individual Auxiliar Contable. Consultor IBRD / 87120 Project Management Post Consultant Limited 14,923.00 4,056.29 Terminated 2018-07-17 2018-07-23 2018-07-23 2018-07-25 2018-07-25 2018-08-01 2018-08-01 2019-12-31 de Apoyo - Normativa Selection Nacional AR-UEC-69427-CS-INDV / Individual Consultor de Apoyo en IBRD / 87120 Project Management Post Consultant Limited 88,460.89 31,510.70 Signed 2018-07-12 2018-07-09 2018-07-13 2018-07-10 2018-07-14 2018-07-11 2018-07-16 2018-07-16 2021-12-31 Adquisiciones. Normativa Selection Nacional AR-UEC-71736-CS-CDS / Incorporación de la perspectiva de género en la Integrated Habitat planificación urbana y el IBRD / 87120 Post Direct Selection Direct 68,000.00 73,740.00 Signed 2018-07-26 2018-04-09 2018-08-03 2018-08-02 2018-08-18 2018-08-31 2019-02-14 Improvement diseño de espacios públicos en comunidades vulnerables en Argentina Individual AR-UEC-76004-CS-INDV / IBRD / 87120 Institutional Strengthening Post Consultant Direct 41,300.00 15,846.77 Signed 2018-12-06 2018-12-09 2018-12-11 2018-12-15 2018-09-01 2021-12-31 Auxiliar en Comunicación Selection Individual AR-UEC-76011-CS-INDV / IBRD / 87120 Institutional Strengthening Post Consultant Direct 32,400.00 14,160.82 Signed 2018-12-06 2018-12-09 2018-12-11 2018-12-15 2018-12-15 2021-12-31 Auxiliar Administrativo Selection Individual AR-UEC-76013-CS-INDV / IBRD / 87120 Institutional Strengthening Post Consultant Direct 36,200.00 17,095.19 Signed 2018-12-06 2018-12-09 2018-12-11 2018-12-15 2018-09-01 2021-12-31 Auxiliar Administrativo Selection Individual AR-UEC-76023-CS-INDV / IBRD / 87120 Institutional Strengthening Post Consultant Direct 38,900.00 18,652.94 Signed 2018-12-06 2018-12-10 2018-09-01 2018-12-12 2018-09-01 2018-12-15 2018-12-15 2021-12-31 Auxiliar Legal Selection AR-UEC-86872-CS-CDS / Consultoría para la Identificación de los Usos del Suelo Formal e Informal en los IBRD / 87120 Institutional Strengthening Post Direct Selection Direct 18,852.46 30,491.93 Signed 2018-12-17 2018-09-17 2018-12-30 2019-01-10 2019-02-22 2019-08-26 2019-04-23 Principales Áreas Urbanas de Argentina mediante Imágenes Satelitales AR-UEC-75983-CS-INDV / Individual Analista en Planificación de IBRD / 87120 Project Management Post Consultant Direct 61,900.00 26,045.06 Signed 2018-12-17 2018-12-19 2018-12-20 2018-12-22 2018-08-01 2022-01-07 Programas Selection Individual AR-UEC-69444-CS-INDV / IBRD / 87120 Project Management Post Consultant Limited 82,020.00 0.00 Canceled 2018-07-17 2018-07-21 2018-07-23 2018-07-22 2018-07-27 2018-08-01 2021-12-31 Especialista Legal Selection AR-MININTERIOR-105964-CS- CDS / Servicio de consultoría para el Asesoramiento en IBRD / 87120 Institutional Strengthening Post Direct Selection Direct 50,000.00 34,786.12 Signed 2019-04-01 2019-03-19 2019-04-10 2019-05-14 2019-05-31 2019-08-09 2019-09-28 Diseño de Programas de Alquiler Social AR-MININTERIOR-107017-CS- CDS / Identificación de IBRD / 87120 Institutional Strengthening Post Direct Selection Direct 80,000.00 50,855.92 Signed 2019-04-05 2019-03-20 2019-04-14 2019-04-11 2019-06-07 2019-05-16 2019-11-04 Mejores Prácticas - SIU AR-MININTERIOR-110911-CS- Individual INDV / Responsable de IBRD / 87120 Institutional Strengthening Post Consultant Limited 15,000.00 17,463.21 Signed 2019-04-17 2019-04-15 2019-04-22 2019-03-07 2019-04-27 2019-03-20 2019-05-01 2019-05-02 2019-12-31 Seguimiento de cartera de Selection proyectos de Vivienda AR-MININTERIOR-123534-CS- Individual Pending INDV / Refuerzo IBRD / 87120 Institutional Strengthening Post Consultant Limited 12,500.00 0.00 2019-07-24 2019-07-29 2019-07-30 2019-08-01 2021-01-22 Implementation Administrativo UEM Cordoba Selection AR-MININTERIOR-123538-CS- Individual Integrated Habitat Pending INDV / Promotores IBRD / 87120 Post Consultant Limited 25,000.00 0.00 2019-07-24 2019-07-27 2019-07-29 2019-08-01 2021-01-22 Improvement Implementation Ambientales - Córdoba Selection AR-MININTERIOR-123541-CS- Individual Integrated Habitat Pending INDV / Inspectores de Obra - IBRD / 87120 Post Consultant Limited 25,000.00 0.00 2019-07-24 2019-07-27 2019-07-29 2019-08-01 2021-01-22 Improvement Implementation Córdoba Selection AR-MININTERIOR-123543-CS- Individual Integrated Habitat Pending INDV / Promotores Sociales - IBRD / 87120 Post Consultant Limited 25,000.00 0.00 2019-07-24 2019-07-27 2019-07-29 2019-08-01 2021-01-22 Improvement Implementation Córdoba Selection AR-MININTERIOR-123544-CS- Individual Integrated Habitat Pending INDV / Promotor Urbano - IBRD / 87120 Post Consultant Limited 12,500.00 0.00 2019-07-24 2019-07-27 2019-07-29 2019-08-01 2021-01-22 Improvement Implementation Córdoba Selection AR-MININTERIOR-130310-CS- Individual Integrated Habitat Pending INDV / Inspector de Obra - IBRD / 87120 Post Consultant Limited 12,500.00 0.00 2019-09-17 2019-09-20 2019-09-25 2019-10-01 2021-09-20 Improvement Implementation UEM Mendoza Selection Page 4 AR-MININTERIOR-130311-CS- Individual Integrated Habitat Pending INDV / Promotor ambiental - IBRD / 87120 Post Consultant Limited 12,500.00 0.00 2019-09-17 2019-09-20 2019-09-25 2019-10-01 2021-09-20 Improvement Implementation UEM Mendoza Selection AR-MININTERIOR-130312-CS- Individual Integrated Habitat Pending INDV / Promotor social - UEM IBRD / 87120 Post Consultant Limited 12,500.00 0.00 2019-09-17 2019-09-20 2019-09-25 2019-10-01 2021-09-20 Improvement Implementation Mendoza Selection AR-MININTERIOR-130314-CS- Individual Integrated Habitat Pending INDV / Promotor Urbano - IBRD / 87120 Post Consultant Limited 12,500.00 0.00 2019-09-17 2019-09-20 2019-09-25 2019-10-01 2021-09-20 Improvement Implementation UEM Mendoza Selection AR-MININTERIOR-130313-CS- Individual Integrated Habitat Pending INDV / Promotor legal - UEM IBRD / 87120 Post Consultant Limited 12,500.00 0.00 2019-09-17 2019-09-20 2019-09-25 2019-10-01 2021-09-20 Improvement Implementation Mendoza Selection AR-MININTERIOR-142827-CS- Individual Integrated Habitat Pending INDV / Promotor urbano UEP - IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation Mendoza Selection AR-MININTERIOR-146780-CS- Individual Integrated Habitat Pending INDV / Promotor Urbano UEP IBRD / 87120 Post Consultant Open 12,000.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation - Corrientes Selection AR-MININTERIOR-142828-CS- Individual Integrated Habitat Pending INDV / Promotor de Obra UEP IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation - Mendoza Selection AR-MININTERIOR-142825-CS- Individual Integrated Habitat Pending INDV / Promotor ambiental IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation UEP - Mendoza Selection AR-MININTERIOR-142829-CS- Individual Integrated Habitat Pending INDV / Promotor Legal UEP - IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation Mendoza Selection AR-MININTERIOR-142833-CS- Individual Integrated Habitat Pending INDV / Promotor Social UEP - IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation Mendoza Selection AR-MININTERIOR-142610-CS- Individual Integrated Habitat Pending INDV / Promotor social UEP - IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation Catamarca Selection AR-MININTERIOR-142609-CS- Individual Integrated Habitat Pending INDV / Promotor ambiental IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation UEP - Catamarca Selection AR-MININTERIOR-142608-CS- Individual Integrated Habitat Pending INDV / Inspector de Obra UEP IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation - Catamarca Selection AR-MININTERIOR-142611-CS- Individual Integrated Habitat Under INDV / Promotor legal UEP - IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2021-03-29 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation Catamarca Selection AR-MININTERIOR-142612-CS- Individual Integrated Habitat Pending INDV / Promotor Urbano UEP IBRD / 87120 Post Consultant Open 12,500.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation - Catamarca Selection AR-MININTERIOR-146778-CS- Individual Integrated Habitat Pending INDV / Promotor Social UEP - IBRD / 87120 Post Consultant Open 12,000.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation Corrientes Selection AR-MININTERIOR-146781-CS- Individual Integrated Habitat Pending INDV / Inspector de Obra UEP IBRD / 87120 Post Consultant Open 12,000.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation - Corrientes Selection AR-MININTERIOR-146777-CS- Individual Integrated Habitat Pending INDV / Promotor Legal UEP - IBRD / 87120 Post Consultant Open 12,000.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation Corrientes Selection AR-MININTERIOR-146776-CS- Individual Integrated Habitat Pending INDV / Promotor Ambiental IBRD / 87120 Post Consultant Open 12,000.00 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Improvement Implementation UEP - Corrientes Selection Page 5 PLAN DE PASSATION DE MARCHÉS Information sur le Projet : BURKINA FASO : Projet D’urgence de Développent Local et de Résilience (P175382) Agence d’exécution du Projet : PUDTR Date du plan de passation des marchés : Octobre 2020 Période couverte par ce plan de passation des marchés : Octobre 2020 à Septembre 2021 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016 révisé en Juillet et Août 2020) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, au cas où la procédure de passation des marché est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics (Décret no 207- 0049/PRES/PM/MINEFID portant procédures de passation, d’exécution et de règlement des marchés publics et des délégations de service public), ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : - Contrôle a priori des structures de contrôle des marchés publics (DCMEF et DGCMEF) et autorisations sur les ententes directes : Non applicable; -Seuils nationaux de passation de marchés : Non applicable -Rejet de l’offre anormalement inférieure ou supérieure de 15 % de la moyenne du montant prévisionnel du client et de la moyenne des offres conformes : Non applicable - Application selon le financement de la marge de préférence nationale, communautaire et locale (collectivités locales) : Non applicable -Signature d’un nouveau marché pour donner suite à une variation du montant du marché de plus de 30 % du montant initial; Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés : « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés : « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas Travaux ne s’applique pas L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique. Autres informations pertinentes sur la passation des marchés Néant. SEUILS POUR LES METHODES DE PASSATION ET MARCHES 1. TRAVAUX, FOURNITURES ET SERVICES AUTRE QUE SERVICES DE CONSULTANTS Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES (US$ TRAVAUX (US$ équivalent) équivalent) AOI AON CFEN AOI AON CF ≥10.000.0 <10.000.0 <1.00.0 ≥1.000.0 <1.000.0 <500.0 00 00 00 00 00 00 2. SELECTION DE CONSULTANTS - Liste restreinte composée entièrement de firmes nationales: La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’investissement (FPI) - Passation des Marchés de fournitures, de travaux et de services (autres que les services de consultants) et Services de Consultants, Juillet 2016, révisés en novembre 2017 et Août 2018 et l’Emprunteur ne procède pas à une publication dans UNDB. - Autre arrangement spécial de Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; PROCUREMENT Burkina Faso : Burkina Faso Emergency Local Development and Resilience Project PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2021-04-19 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175382 GPN Date: Project Name: Burkina Faso Emergency Local Development and Resilience Project Loan / Credit No: IDA / D7610 Emergency Local Development and Resilience Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BF-PUDTR-236209-CW-RFQ / Réalisation de 57 travaux de foration dans les communes Request for Pending Improved access to basic Request for Single Stage - One 2021-08- de Bogandé (10), de Mani (3), IDA / D7610 Post Limited Quotations (Non 513,000.00 0.00 Implementat 2021-06-20 2021-07-17 social services Quotations Envelope 01 de Coalla (15), de Solenzo (5), Bank-SPD) ion de Sanaba (14) et de Bomborokuy (10) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PUDTR-228690-GO-RFQ Pending Community Engagement and Request for Single Stage - One / Installation et fourniture de IDA / D7610 Post Limited 24,000.00 0.00 Implementati 2021-05-05 2021-06-07 2021-07-09 Project Management Quotations Envelope connexion internet haut débit on BF-PUDTR-228691-GO-RFQ Pending Community Engagement and Request for Single Stage - One / Acquisition d'équipement et IDA / D7610 Post Limited 100,100.00 0.00 Implementati 2021-05-05 2021-06-08 2021-07-14 Project Management Quotations Envelope mobilier de bureau on BF-PUDTR-229534-GO-RFQ Pending Community Engagement and Request for Single Stage - One / Acquisition de fournitures IDA / D7610 Post Limited 63,800.00 0.00 Implementati 2021-04-25 2021-05-27 2021-06-26 Project Management Quotations Envelope de bureau au profit du PUDTR on BF-PUDTR-229540-GO-RFQ Pending / Acquisition de matériels Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 90,200.00 0.00 Implementati 2021-04-25 2021-05-27 2021-07-11 informatique et bureautique Project Management Quotations Envelope on au profit du PUDTR BF-PUDTR-237107-GO-DIR / L’acquisition du matériel Pending roulant au profit du Projet Community Engagement and IDA / D7610 Post Direct Selection Direct 200,000.00 0.00 Implementati 2021-06-10 2021-06-15 2021-07-20 2021-10-18 d’Urgence de Développement Project Management on Territorial et de Résilience (PUDTR) BF-PUDTR-237128-GO-RFQ Pending Community Engagement and Request for Single Stage - One / Câblage réseau informatique IDA / D7610 Post Limited 12,000.00 0.00 Implementati 2021-06-26 2021-07-28 2021-08-27 Project Management Quotations Envelope des locaux de l'UCP du PUDTR on BF-PUDTR-237132-GO-RFQ / Acquisition d'équipement de classe (tables bancs, armoires Pending Improved access to basic Request for Single Stage - One métalliques, bureaux et IDA / D7610 Post Limited 390,000.00 0.00 Implementati 2021-06-30 2021-08-25 2021-10-24 social services Quotations Envelope chaises) pour les écoles dans on le cadre de la mise en œuvre du PUDTR BF-PUDTR-237134-GO-RFQ / Acquisition de manuels Pending Improved access to basic Request for Single Stage - One scolaires, fournitures scolaires IDA / D7610 Post Limited 310,000.00 0.00 Implementati 2021-06-30 2021-08-25 2021-10-24 social services Quotations Envelope et matériels didactique dans on le cadre du PUDTR BF-PUDTR-238993-GO-RFQ Pending / Acquisition de carburant Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 120,500.00 0.00 Implementati 2021-07-05 2021-08-05 2021-08-20 pour les activités de mise en Project Management Quotations Envelope on oeuvre du PUDTR NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PUDTR-229549-NC-RFQ Pending / L’acquisition des services de Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 10,000.00 0.00 Implementati 2021-05-05 2021-06-05 2021-07-05 gardiennage des locaux de Project Management Quotations Envelope on l’UGP du PUDTR BF-PUDTR-229551-NC-RFQ Pending / L’acquisition des services de Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 12,000.00 0.00 Implementati 2021-05-05 2021-06-05 2021-07-05 nettoyage et d'entretien des Project Management Quotations Envelope on locaux de l’UGP BF-PUDTR-228653-NC-DIR / Pending L’acquisition d'une police Community Engagement and Request for Single Stage - One IDA / D7610 Post Limited 70,000.00 0.00 Implementati 2021-05-20 2021-07-15 2022-01-11 d'assurance maladie au profit Project Management Quotations Envelope on du personnel UGP BF-PUDTR-232913-NC-RFQ Pending Community Engagement and Request for Single Stage - One / Assurance de matériels IDA / D7610 Post Limited 18,000.00 0.00 Implementati 2021-07-15 2021-09-09 2022-03-08 Project Management Quotations Envelope roulants on Page 1 BF-PUDTR-237122-NC-RFQ / Acquisition de service de Pending Community Engagement and Request for Single Stage - One transit des véhicules issus de IDA / D7610 Post Limited 36,000.00 0.00 Implementati 2021-07-25 2021-08-25 2021-09-24 Project Management Quotations Envelope l'accord cadre entre le PUDTR on et l'UNOPS BF-PUDTR-238989-NC-RFQ Under / Acquisition, installation et Community Engagement and IDA / D7610 Post Direct Selection Direct 70,000.00 0.00 Implementati 2021-06-21 2021-06-17 2021-06-26 2021-07-25 2021-09-08 suivi du logiciel de gestion Project Management on Tom²pro au profit du PUDTR CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PUDTR-228649-CS-LCS / Community Engagement and Least Cost Under Recrutement d'un cabinet IDA / D7610 Post Open - National 90,000.00 0.00 2021-04-30 2021-04-26 2021-05-21 2021-07-04 2021-08-01 2021-08-31 2021-10-05 2021-11-09 2022-05-08 Project Management Selection Implementation pour l'audit du projet BF-PUDTR-229596-CS-CQS / Etude d'actualisation pour la réalisation de 223 nouvell infrast dans la BM (173) et à l'Est (50) soit 27CSPS, 20CEG, Consultant Improved access to basic Under 5Complex, 20CEG, 2lycé, IDA / D7610 Post Qualification Limited 276,460.00 0.00 2021-05-01 2021-04-27 2021-05-11 2021-05-16 2021-05-28 2021-07-27 social services Implementation 5Complex, 1Salle Poly, Selection 125boutiq, 22peri mar, 6marchés, 4gare, 2maga, 3air d'aba, 2hangar, 2Hall et 2parc de vacc BF-PUDTR-229517-CS-CQS / Etude d'actualisation relatif à la normalisation de 314 infrastructures sociales dans Consultant la région de la Boucle du Improved access to basic Under IDA / D7610 Post Qualification Limited 124,650.00 0.00 2021-04-30 2021-04-27 2021-05-05 2021-05-10 2021-05-22 2021-06-21 Mouhoun (281) et de l’Est (33) social services Implementation Selection soit 209 salles de classe, 57 forages, 24 latrines, 9 clôtures, .6 Bâtiments, 6 CSPS et 3 CEG. BF-PUDTR-236192-CS-CQS / Recrutement d’ONG en appui Consultant à la mise en œuvre des Community Engagement and Under IDA / D7610 Post Qualification Open - National 200,000.00 0.00 2021-06-04 2021-05-07 2021-06-25 2021-08-08 2021-09-07 2021-10-12 2022-04-10 activités de prévention et Project Management Implementation Selection réponse aux violences basées sur le genre(VBG)/EAS/HS du PUDTR BF-PUDTR-236206-CS-CQS / Etudes étude d'impact Consultant Improved access to basic Under environnemental et social de IDA / D7610 Post Qualification Limited 72,000.00 0.00 2021-08-30 2021-06-14 2021-09-06 2021-09-13 2021-09-30 2021-12-29 social services Implementation la réalisation de 400 pistes Selection rurales BF-PUDTR-236195-CS-CQS / Etudes techniques et suivi- Consultant contrôle des travaux de Improved access to basic Under IDA / D7610 Post Qualification Limited 270,000.00 0.00 2021-06-04 2021-06-04 2021-06-11 2021-06-18 2021-07-05 2021-10-03 réalisation de neuf (09) social services Implementation Selection systèmes d’adduction en eau potable simplifiée (AEPS) BF-PUDTR-237117-CS-CQS / Etudes techniques et suivi- Improve Physical and Virtual Consultant Under contrôle des travaux de IDA / D7610 Connectivity and Urban Post Qualification Limited 40,500.00 0.00 2021-06-15 2021-06-04 2021-06-22 2021-06-29 2021-07-16 2021-10-14 Implementation construction de trois (03) Resilience Selection ouvrages de franchissement BF-PUDTR-236196-CS-CQS / Etudes techniques et suivi- Consultant Community Level Economic Under contrôle des travaux IDA / D7610 Post Qualification Limited 380,000.00 0.00 2021-05-31 2021-06-04 2021-06-07 2021-06-14 2021-07-01 2021-12-28 Recovery and Empowerment Implementation d'aménagement de 380 Ha de Selection Basfonds BF-PUDTR-238341-CS-CQS / Consultant Etude technique pour la Community Level Economic Pending IDA / D7610 Post Qualification Limited 17,640.00 0.00 2021-06-30 2021-07-07 2021-07-14 2021-07-31 2021-10-29 construction d'un abattoir Recovery and Empowerment Implementation Selection moderne à Tougan BF-PUDTR-238343-CS-CQS / Etude d'impact Consultant Community Level Economic Pending environnementale et social IDA / D7610 Post Qualification Limited 20,000.00 0.00 2021-06-30 2021-07-07 2021-07-14 2021-07-31 2021-10-29 Recovery and Empowerment Implementation pour la construction d'un Selection abattoir moderne à Tougan BF-PUDTR-238350-CS-CQS / Consultant Community Level Economic Pending Réalisation de NIES pour IDA / D7610 Post Qualification Limited 20,000.00 0.00 2021-06-30 2021-07-07 2021-07-14 2021-07-31 2021-10-29 Recovery and Empowerment Implementation l'aménagement de bafonds Selection BF-PUDTR-238346-CS-CQS / Etude technique pour la réalisation des infrastructures Consultant marchandes (abattoir Community Level Economic Pending IDA / D7610 Post Qualification Limited 70,860.00 0.00 2021-06-25 2021-07-02 2021-07-09 2021-07-26 2021-10-24 moderne, laiterie, l'installation Recovery and Empowerment Implementation Selection solaire, marché sécondaire, marchés de fruits, bouchérie, 3 unités de transformation) BF-PUDTR-238279-CS-QCBS / Etudes techniques et suivi- Improve Physical and Virtual contrôle des travaux de Quality And Cost- Under IDA / D7610 Connectivity and Urban Post Open - International 800,000.00 0.00 2021-06-15 2021-06-04 2021-07-15 2021-07-23 2021-08-22 2021-08-29 2021-09-20 2021-10-19 2022-01-17 renforcement du reseau de Based Selection Implementation Resilience drainage des eaux pluiviables de la ville de Fada BF-PUDTR-236199-CS-QCBS / Etudes techniques et suivi- Improve Physical and Virtual contrôle des travaux Quality And Cost- Under IDA / D7610 Connectivity and Urban Post Open - International 3,600,000.00 0.00 2021-06-15 2021-06-04 2021-06-18 2021-07-09 2021-07-12 2021-07-19 2021-08-24 2021-09-22 2021-10-01 d'aménagement de 400 km Based Selection Implementation Resilience pistes dans le cadre de la mise en œuvre du PUDTR Page 2 BF-PUDTR-238348-CS-CQS / Etude d'adaptation Consultant infrastructures marchandes Community Level Economic Pending IDA / D7610 Post Qualification Limited 179,650.00 0.00 2021-06-30 2021-07-07 2021-07-14 2021-07-31 2021-10-29 (Aire d'abattage, marché, Recovery and Empowerment Implementation Selection hall, hangar, boutiques de rue, magasin de stokage) BF-PUDTR-238985-CS-CQS / Réalisation de 20 Notices Consultant d'Impact Environnemental et Community Level Economic Pending IDA / D7610 Post Qualification Limited 133,000.00 0.00 2021-06-25 2021-07-02 2021-07-09 2021-07-26 2021-08-25 Social (NIES) dans le cadre de Recovery and Empowerment Implementation Selection la réalisation des infrastructures marchandes BF-PUDTR-238986-CS-CQS / Consultant Etude d'identification des Community Level Economic Pending IDA / D7610 Post Qualification Limited 30,000.00 0.00 2021-07-20 2021-08-03 2021-08-13 2021-09-02 2021-11-01 opportunité d'AGR dans la Recovery and Empowerment Implementation Selection zone cible BF-PUDTR-238987-CS-CQS / Etude techniques pour la Consultant construction et équipement Community Level Economic Pending IDA / D7610 Post Qualification Limited 21,000.00 0.00 2021-07-15 2021-07-22 2021-07-29 2021-08-15 2021-11-13 de 2 centres de tissage pour Recovery and Empowerment Implementation Selection femmes à Bomborokuy et Yaba BF-PUDTR-238990-CS-CQS / Consultant Community Engagement and Under Elaboration d'un plan IDA / D7610 Post Qualification Limited 40,000.00 0.00 2021-06-25 2021-06-10 2021-07-10 2021-07-25 2021-08-11 2021-09-25 Project Management Implementation stratégique de communication Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PUDTR-238285-CS-INDV / Recrutement d’un Individual Community Engagement and Under consultant individuel pour une IDA / D7610 Post Consultant Limited 35,000.00 0.00 2021-06-10 2021-06-04 2021-06-15 2021-06-25 2021-07-12 2022-07-07 Project Management Implementation assistance Technique à l’Unité Selection de Coordination du PUDTR Page 3 Procurement Plan SUPPORTING EDUCATION REFORM IN TARGETED CIRCUITS PROJECT I. General 1. Bank’s approval Date of the procurement Plan Original: August 21, 2015: Revision 3 of Updated Procurement Plan, February 2017] 2. Date of General Procurement Notice: February 24, 2016 3. Period covered by this procurement plan: The procurement period of project covered process from year 2016 to 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Prior Review Threshold Comments Method US$ 1. ICB and LIB (Goods) Above US$ 500,000 2. NCB (Goods) Above US$ 100,000 First two each year 3. ICB (Works) Above US$ 8 million 4. NCB (Works) Above US$ 5 million First two each year and all above US$ 5 million 5. Non-Consultant Below US$ 100,000 First two each Services (NCB) year 6. Direct Contracting All 2. Reference to Project Operational/Procurement Manual : Project Implementation Manual for World Bank Loan Project P152096, 12/21/2015 issued by MINEDUC 3. Any Other Special Procurement Arrangements: Works procured under this Project may include the construction and remodeling of “Millennium Schools” and other related civil works infrastructure, etc. International Competitive Bidding (ICB) packages would be required. Also packages amounting to under US$8,000,000 in the aggregate may be procured using National Competitive Bidding (NCB) processes. Shopping procedures may be used for contracts of up to US$200,000 (only in emergency cases). 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness March 20, 2017 1 2 3 4 5 6 7 Ref. Description Estimated Package Domestic Review Comme No. Cost s Preferenc by Bank nts US$ million e (Prior / (yes/no) Post) Summary of 3 No Prior the ICB 10,120,0 (Goods) 94 Summary of 8 No Post the NCB 43,482,6 (Works) 16 Summary of 334,794 2 No Post the NCB (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 200,000 2. Single Source (Firms) All 3. Individual Above US$ 100,000 4. Single Source All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 200,000 per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref Description of Estimated Packag Review Comments . Assignment Cost es by Bank No. US$ (Prior / million Post) Summary of 2,143,55 7 Prior QCBS number of 5 contracts that will be let under QCBS Summary of 399,092 7 Post CQS, CDS number of contracts that will March 20, 2017 be let under other methods March 20, 2017 PROCUREMENT Ecuador : Supporting Education Reform in Targeted Circuits PLAN General Information Country: Ecuador Bank’s Approval Date of the Original Procurement Plan: 2017-02-06 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152096 GPN Date: Project Name: Supporting Education Reform in Targeted Circuits Loan / Credit No: IBRD / 85420 Ministry of Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BIRF-8542-LPN-OB-2016- 001 / Construcción de Unidad Component 1: Improving Educativa Mayor San Pedro Single Stage - One 6,351,831.9 2018-03- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,860,298.17 Signed 2017-01-24 2017-03-01 2017-02-03 2017-03-01 2017-03-05 2017-04-06 2017-04-04 2017-05-18 2017-05-16 2017-06-21 (Santa Lucía) en la parroquia Envelope 5 12 Circuits Santa Lucía, cantón Santa Lucía, provincia de Guayas BIRF-8542-LPN-OB-2016- 002 / Construcción de Unidad Component 1: Improving Educativa Mayor Ala 21 (UEM Single Stage - One 5,478,623.6 2018-03- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,384,802.02 Signed 2017-02-17 2017-03-01 2017-02-22 2017-03-01 2017-03-24 2017-04-10 2017-04-23 2017-04-26 2017-05-28 2017-06-01 Nueva Milagro) en la Envelope 7 24 Circuits parroquia Milagro, cantón Milagro, provincia de Guayas BIRF-8542-LPN-OB-2016- 004 / Repotenciación de Component 1: Improving Unidad Educativa Natalia Single Stage - One 2018-01- IBRD / 85420 school services in Targeted Post Request for Bids Open - National 3,724,269.97 0.00 Canceled 2017-02-17 2017-02-28 2017-02-22 2017-03-03 2017-03-24 2017-04-05 2017-04-23 2017-08-15 2017-05-28 Jarrín en la parroquia Envelope 23 Circuits Cayambe, cantón Cayambe, provincia de Pichincha BIRF-8542-LPN-OB-2017- 005 / Construcción de Unidad Component 1: Improving Educativa Mayor Mitad del Single Stage - One 5,436,220.7 2018-03- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,372,132.36 Signed 2017-02-17 2017-03-01 2017-02-22 2017-03-01 2017-03-24 2017-04-11 2017-04-23 2017-04-25 2017-05-28 2017-06-05 Mundo (frente a UNASUR) en Envelope 2 24 Circuits la parroquia San Antonio, cantón Quito, provincia de Pichincha BIRF-8542-LPN-OB-2017- 006 / Construcción de Unidad Component 1: Improving Educativa Cangahua en la Single Stage - One 6,260,800.0 2018-04- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,971,993.83 Signed 2017-03-03 2017-03-07 2017-03-13 2017-03-07 2017-04-12 2017-04-10 2017-05-12 2017-06-05 2017-06-16 2017-10-16 parroquia Cangahua, cantón Envelope 0 12 Circuits Cayambe, provincia de Pichincha BIRF-8542-LPN-OB-2017- 007 / Construcción de Unidad Component 1: Improving Educativa Mayor UEM Nueva Single Stage - One 2018-04- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 6,042,445.66 0.00 Canceled 2017-03-03 2017-03-07 2017-03-13 2017-03-20 2017-04-12 2017-05-12 2017-06-16 Mocache, en la parroquia Envelope 12 Circuits Mocache, cantón Mocache, provincia de Los Ríos BIRF-8542-LPN-OB-2017- 009 / Construcción de Unidad Component 1: Improving Educativa Mayor UEM Nueva Single Stage - One 5,740,323.3 2018-06- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 6,042,445.66 Signed 2017-05-03 2017-05-04 2017-05-08 2017-05-05 2017-06-05 2017-06-07 2017-07-03 2017-10-16 2017-08-07 2017-11-15 Mocache, en la parroquia Envelope 8 03 Circuits Mocache, cantón Mocache, provincia de Los Ríos BIRF-8542-LPN-OB-2017- 008 / Construcción de Unidad Educativa Mayor Valencia 1 Component 1: Improving Single Stage - One 2018-04- (Vicente Rocafuerte), en la IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,772,502.27 0.00 Canceled 2017-03-07 2017-03-07 2017-03-17 2017-03-07 2017-04-16 2017-05-16 2017-06-20 Envelope 16 parroquia Valencia, cantón Circuits Valencia, provincia de Los Ríos BIRF-8542-LPN-OB-2017- 010 / Construcción de Unidad Educativa Mayor Valencia 1 Component 1: Improving Single Stage - One 5,561,420.9 2018-06- (Vicente Rocafuerte), en la IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,772,502.27 Signed 2017-05-03 2017-05-04 2017-05-08 2017-05-04 2017-06-05 2017-06-07 2017-07-03 2017-10-16 2017-08-07 2017-11-15 Envelope 1 03 parroquia Valencia, cantón Circuits Valencia, provincia de Los Ríos BIRF-8542-LPN-OB-2016- 003 / Repotenciación de Component 1: Improving Unidad Educativa Malchinguí, Single Stage - One 2018-03- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,354,172.05 0.00 Canceled 2017-02-17 2017-03-01 2017-02-22 2017-03-01 2017-03-24 2017-04-07 2017-04-23 2017-06-05 2017-05-28 parroquia Malchinguí, cantón Envelope 24 Circuits Pedro Moncayo, provincia de Pichincha BIRF-8542-LPI-OB-2020- 017 / Construcción de la Component 1: Improving Under Repotenciación UE Nicolás Single Stage - One 2021-10- IBRD / 85420 school services in Targeted Prior Request for Bids Open - International 8,732,115.46 0.00 Implementat 2020-09-25 2020-12-11 2020-09-30 2020-12-22 2020-11-11 2021-02-05 2020-11-26 2021-05-05 2020-12-28 Infante Díaz en la parroquia Envelope 24 Circuits ion San Camilo cantón Quevedo provincia Los Ríos BIRF-8542-LPI-OB-2020- 018 / Construcción de la Component 1: Improving Under Repotenciación UE Quevedo Single Stage - One 2021-10- IBRD / 85420 school services in Targeted Prior Request for Bids Open - International 8,749,327.24 0.00 Implementat 2020-09-24 2020-12-11 2020-09-29 2020-12-21 2020-11-10 2021-02-11 2020-11-25 2021-03-27 2020-12-27 en la parroquia 24 de Mayo Envelope 23 Circuits ion cantón Quevedo provincia de Los Ríos BIRF-8542-LPI-OB-2020- 019 / Construcción de la Component 1: Improving Under Repotenciación UE Ángel Single Stage - One 2021-10- IBRD / 85420 school services in Targeted Prior Request for Bids Open - International 9,240,000.00 0.00 Implementat 2020-09-30 2020-12-21 2020-10-05 2021-01-18 2020-11-16 2021-02-09 2020-12-01 2021-03-26 2020-12-30 Polibio Chávez en la parroquia Envelope 26 Circuits ion Ángel Polibio Chávez cantón Guaranda provincia de Bolívar Page 1 BIRF-8542-LPN-OB-2020- 013 / Construcción de la Component 1: Improving Under Repotenciación UEIB Dolores Single Stage - One 2021-11- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,266,621.06 0.00 Implementat 2020-11-06 2020-12-21 2020-11-13 2020-12-22 2020-12-12 2021-02-04 2020-12-26 2021-03-26 2021-01-26 Cacuango en la parroquia Envelope 22 Circuits ion Cangahua cantón Cayambe provincia de Pichincha BIRF-8542-LPN-OB-2020- 015 / Construcción de la Component 1: Improving Single Stage - One 2021-11- Repotenciación UE 23 de Junio IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 6,414,219.36 0.00 Canceled 2020-11-05 2020-12-11 2020-11-12 2020-12-22 2020-12-11 2021-02-05 2020-12-25 2021-03-27 2021-01-25 Envelope 21 en la parroquia Baba cantón Circuits Baba provincia Los Ríos BIRF-8542-LPN-OB-2020- 016 / Construcción de la Component 1: Improving Repotenciación UE José María Single Stage - One 2021-11- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,621,881.80 0.00 Canceled 2020-11-05 2020-12-11 2020-11-12 2021-01-18 2020-12-10 2021-02-01 2020-12-24 2021-05-07 2021-01-28 Velasco Ibarra en la parroquia Envelope 24 Circuits Milagro cantón Milagro provincia del Guayas BIRF-8542-LPN-OB-2019- 012 / Construcción de la Repotenciación de la Unidad Component 1: Improving Under Single Stage - One 2021-12- Educativa Natalia Jarrín, IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,660,218.77 0.00 Implementat 2020-11-13 2020-12-30 2020-11-20 2020-12-31 2020-12-20 2021-02-11 2021-01-03 2021-03-26 2021-02-07 Envelope 04 parroquia Cayambe, cantón Circuits ion Cayambe, provincia de Pichincha BIRF-8542-LPN-OB-2019- 011 / Construcción de la Repotenciación de la Unidad Component 1: Improving Under Single Stage - One 2021-11- Educativa Malchinguí0, IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,685,921.41 0.00 Implementat 2020-11-12 2020-12-30 2020-11-19 2020-12-31 2020-12-17 2021-02-09 2020-12-31 2021-06-17 2021-02-02 Envelope 29 parroquia Malchinguí, cantón Circuits ion Pedro Moncayo, provincia de Pichincha BIRF-8542-LPN-OB-2020- 014 / Construcción de la Component 1: Improving Repotenciación UEIB Single Stage - One Under 2021-10- IBRD / 85420 school services in Targeted Prior Request for Bids Open - National 5,752,022.30 0.00 2020-11-13 2020-12-21 2020-11-20 2020-12-22 2020-12-18 2021-02-04 2021-01-01 2021-02-01 Surupucyu en la parroquia Envelope Review 29 Circuits Guanujo cantón Guaranda provincia de Bolívar GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BIRF-8542-LPN-B-2017-001 / Adquisición de Material Didáctico para estudiantes Component 1: Improving Single Stage - One con necesidades especiales en IBRD / 85420 school services in Targeted Post Request for Bids Open - National 220,786.39 158,927.89 Completed 2017-01-31 2017-05-12 2017-02-07 2017-06-01 2017-03-09 2017-06-26 2017-03-30 2017-07-04 2017-05-04 2017-08-08 2017-07-03 2017-11-29 Envelope unidades educativas de oferta Circuits ordinaria en los 9 distritos focalizados del proyecto BIRF-8542-LPI-B-2016-001 / Adquisición de Component 1: Improving Computadores personales Single Stage - One IBRD / 85420 school services in Targeted Prior Request for Bids Open - International 6,270,000.00 5,893,050.24 Signed 2017-01-11 2017-09-15 2017-03-03 2017-09-21 2017-04-14 2017-11-15 2017-05-14 2018-01-09 2017-06-18 2018-04-12 2017-09-16 para el Programa de Envelope Circuits Comunidad Educativa en Línea en los Circuitos Focalizados BIRF-8542-LPI-B-2017-002 / Equipamiento de UEM tipología mayor San Pedro Component 1: Improving (Santa Lucía) y Nuevo Milagro Single Stage - One IBRD / 85420 school services in Targeted Prior Request for Bids Open - International 2,380,628.43 0.00 Canceled 2017-06-15 2017-07-15 2017-08-26 2017-09-25 2017-11-20 2018-02-18 en la Zona 5 y UNASUR en la Envelope Circuits zona 9 y de Unidades Repotenciadas Malchinguí y Natalia Jarrín en la Zona 2 BIRF-8542-LPI-B-2017-003 / Equipamiento de UEM tipología mayor: Cangahua en cantón Cayambe, provincia Component 1: Improving de Pichincha, Zona 2, Nueva Single Stage - One IBRD / 85420 school services in Targeted Prior Request for Bids Open - International 1,469,466.30 0.00 Canceled 2017-10-04 2017-10-29 2017-12-10 2018-01-09 2018-02-27 2018-04-28 Mocache en cantón Mocache y Envelope Circuits Valencia 1 (Vicente Rocafuerte) en el cantón Valencia en la provincia de Los Ríos BIRF-8542-LPN-B-2016-002 / Adquisición Equipamiento Tecnológico para estudiantes Component 1: Improving Single Stage - One con necesidades especiales en IBRD / 85420 school services in Targeted Post Request for Bids Open - National 114,008.28 0.00 Canceled 2017-01-31 2017-02-07 2017-02-10 2017-03-03 2017-04-07 2017-06-06 Envelope unidades educativas de oferta Circuits ordinaria en los 9 distritos focalizados del proyecto Component 2: Strengthening BIRF-8542-LPN-B-2018-003 Planning, Management and Single Stage - One / Renovación de la Licencia IBRD / 85420 Post Request for Bids Open - National 149,665.60 133,360.00 Completed 2018-03-30 2019-06-18 2018-04-04 2019-06-19 2018-05-04 2019-07-12 2018-05-19 2019-09-09 2018-06-23 2019-10-18 2018-07-23 2019-10-30 Evaluation Capacity at Envelope SAP BUSINESSOBJECTS MINEDUC BIRF-8542-LPI-B-2018-004 / Dotación de equipamiento y mobiliario educativo para las unidades educativas Mitad del Component 1: Improving Single Stage - One Mundo (UNASUR) en la IBRD / 85420 school services in Targeted Prior Request for Bids Open - International 586,665.35 0.00 Canceled 2018-06-08 2018-06-29 2018-08-10 2018-08-31 2018-10-05 2018-11-19 Envelope provincia de Pichincha, cantón Circuits Quito, y Cangahua en la provincia de Pichincha cantón Cayambe. Proyecto PARECF BIRF-8542-LPN-B-2018-004 / . Dotación de fondo bibliográfico educativo para las unidades educativas Mitad Component 1: Improving Single Stage - One del Mundo (UNASUR) en la IBRD / 85420 school services in Targeted Post Request for Bids Open - National 119,999.86 0.00 Canceled 2018-06-08 2018-06-29 2018-07-29 2018-08-19 2018-09-23 2018-11-22 Envelope provincia de Pichincha, cantón Circuits Quito, y Cangahua en la provincia de Pichincha cantón Cayambe. Proyecto PARECF Page 2 BIRF-8542-LPN-B-2018-005 / Adquisición de equipamiento tecnológico para las unidades educativas Component 1: Improving Mitad del Mundo (UNASUR) en Single Stage - One IBRD / 85420 school services in Targeted Post Request for Bids Open - National 184,145.32 0.00 Canceled 2018-08-17 2018-08-30 2018-09-29 2018-10-14 2018-11-18 2019-01-17 la provincia de Pichincha, Envelope Circuits cantón Quito, y Cangahua en la provincia de Pichincha, cantón Cayambe. Proyecto PARECF BIRF-8542-LPI-B-2019-005 / Fabricación y dotación de mobiliario administrativo y escolar para las Unidades Component 1: Improving Single Stage - One Educativas: Mitad del Mundo IBRD / 85420 school services in Targeted Prior Request for Bids Open - International 974,250.79 0.00 Canceled 2019-06-17 2019-06-22 2019-08-03 2019-08-24 2019-09-22 2019-11-21 Envelope (UNASUR), San Pedro, Nueva Circuits Milagro, Nueva Mocache y Valencia 1 del Proyecto PARECF BIRF-8542-LPN-B-2019-006 / Adquisición de equipamiento integral para las Component 1: Improving Unidades Educativas: Mitad Single Stage - One IBRD / 85420 school services in Targeted Post Request for Bids Open - National 269,548.26 0.00 Canceled 2019-06-24 2019-06-29 2019-07-29 2019-08-19 2019-09-17 2019-11-16 del Mundo (UNASUR), San Envelope Circuits Pedro, Nueva Milagro, Nueva Mocache y Valencia 1 del Proyecto PARECF BIRF-8542-LPN-B-2019-007 / Adquisición de equipamiento tecnológico Component 1: Improving para las Unidades Educativas: Single Stage - One IBRD / 85420 school services in Targeted Post Request for Bids Open - National 492,543.16 0.00 Canceled 2019-06-27 2019-07-02 2019-08-01 2019-08-22 2019-09-20 2019-11-19 Mitad del Mundo (UNASUR), Envelope Circuits San Pedro, Nueva Milagro, Nueva Mocache y Valencia 1 del Proyecto PARECF BIRF-8542-LPN-B-2019-008 / Adquisición de fondo bibliográfico para las Component 1: Improving Unidades Educativas: Mitad Single Stage - One IBRD / 85420 school services in Targeted Post Request for Bids Open - National 306,024.50 0.00 Canceled 2019-06-14 2019-06-19 2019-07-17 2019-08-01 2019-08-30 2019-10-29 del Mundo (UNASUR), San Envelope Circuits Pedro, Nueva Milagro, Nueva Mocache y Valencia 1 del Proyecto PARECF Component 2: Strengthening BIRF-8542-CD-B-2019-001 Planning, Management and / Adquisición de licencias de IBRD / 85420 Prior Direct Selection Direct 304,400.00 340,289.60 Signed 2019-09-12 2019-10-21 2019-09-27 2019-12-04 2019-10-17 2020-09-17 2020-08-12 Evaluation Capacity at Teaching at the Right Level MINEDUC BIRF-8542-CP-B-2021-001 / Component 1: Improving Pending Adquisición de Cámaras, Request for Single Stage - One IBRD / 85420 school services in Targeted Post Open - National 32,038.11 0.00 Implementati 2021-06-07 2021-07-05 2021-08-04 Accesorios y Equipos para el Quotations Envelope Circuits on Programa de Teleducación NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BIRF-8542-CP-S-2017-005 / Servicio de Geotecnia, Mecánica de Suelos y Pruebas de Hormigón de Estructuras Existentes para la Component 1: Improving Repotenciación de las Request for Single Stage - One IBRD / 85420 school services in Targeted Post Open - National 31,920.00 0.00 Canceled 2017-03-20 2017-04-19 2017-05-09 Unidades Educativas: Quotations Envelope Circuits "Surupucyu", cantón Guaranda, provincia Bolívar y "Dolores Cacunago" en el canton Cayambe, provincia de Pichincha BIRF-8542-CP-S-2017-004 / Servicio de Geotecnia, Mecánica de Suelos y Pruebas de Hormigón de Estructuras Existentes para la Component 1: Improving Request for Single Stage - One Repotenciación de las IBRD / 85420 school services in Targeted Post Open - National 31,920.00 0.00 Canceled 2017-03-20 2017-04-18 2017-05-08 Quotations Envelope Unidades Educativas: "7 de Circuits Octubre", cantón Quevedo, provincia de los Ríos y "Guaranda" en el cantón Guaranda, provincia de Bolívar BIRF-8542-CP-S-2017-003 / Servicio de Geotecnia, Mecánica de Suelos y Pruebas de Hormigón de Estructuras Existentespara la Component 1: Improving Request for Single Stage - One Repotenciación de las IBRD / 85420 school services in Targeted Post Open - National 47,880.00 0.00 Canceled 2017-03-20 2017-04-18 2017-05-08 Quotations Envelope Unidades Educativas: "San Circuits Camilo" y "José Rodríguez" en el cantón Quevedo y "Isla de Bejucal" en el cantón Baba, provincia de Los Ríos BIRF-8542-CP-S-2017-002 / Servicio de Geotecnia, Mecánica de Suelos y Pruebas de Hormigón de Estructuras Existentes para la Component 1: Improving Request for Single Stage - One Repotenciación de Unidades IBRD / 85420 school services in Targeted Post Open - National 47,880.00 0.00 Canceled 2017-03-17 2017-04-17 2017-05-08 Quotations Envelope Educativas: "29 de Agosto" y Circuits "Darío Guevara" en el cantón Babahoyo y "24 de Mayo" en el cantón Quevedo, provincia de Los Ríos Page 3 BIRF-8542-CP-S-2017-001 / Servicio de Geotecnia, Mecánica de Suelos y Pruebas de Hormigón de Estructuras Existentes para la Component 1: Improving Request for Single Stage - One Repotenciación de UE: "Abdón IBRD / 85420 school services in Targeted Post Open - National 47,880.00 0.00 Canceled 2017-03-17 2017-04-17 2017-05-08 Quotations Envelope Calderón" y "Guillermo Durán" Circuits en cantón Milagro, provincia de Guayas y "10 de Agosto" en cantón Montalvo, provincia de Los Ríos BIRF-8542-LPN-NC-2019- 001 / Servicio de Component 2: Strengthening levantamiento de información Planning, Management and Single Stage - One IBRD / 85420 Post Request for Bids Open - National 134,400.00 0.00 Canceled 2019-05-09 2019-11-29 2019-05-14 2019-11-29 2019-06-04 2019-06-11 2019-07-07 2019-09-05 para el pre-pilotaje de la Evaluation Capacity at Envelope implementación de Planes de MINEDUC Mejora BIRF-8542-LPN-NC-2019- 002 / Servicio de Component 2: Strengthening levantamiento de información Planning, Management and Single Stage - One en línea de base para la IBRD / 85420 Post Request for Bids Open - National 310,376.61 0.00 Canceled 2019-09-16 2019-11-29 2019-09-26 2019-11-29 2019-10-24 2019-10-31 2019-11-19 2019-12-29 Evaluation Capacity at Envelope evaluación de impacto del MINEDUC programa Teaching at the Right Level BIRF-8542-LPN-NC-2019- 003 / Servicio de Component 2: Strengthening levantamiento de información Planning, Management and Single Stage - One en línea de base para la IBRD / 85420 Post Request for Bids Open - National 185,747.43 0.00 Canceled 2019-09-16 2019-09-26 2019-10-16 2019-10-23 2019-11-07 2019-12-17 Evaluation Capacity at Envelope evaluación del programa de MINEDUC planes de mejora en la provincia de Pichincha BIRF-8542-LPN-NC-2019- 004 / Servicio de Component 2: Strengthening levantamiento de información Planning, Management and Single Stage - One en línea de base para la IBRD / 85420 Post Request for Bids Open - National 168,000.00 0.00 Canceled 2019-10-04 2019-10-09 2019-11-03 2019-11-17 2019-12-22 2020-12-16 Evaluation Capacity at Envelope evaluación programa de MINEDUC capacitación docente en lectura y escritura BIRF-8542-LPN-NC-2020- 005 / Servicio de Component 2: Strengthening Pending levantamiento de información Planning, Management and Single Stage - One IBRD / 85420 Post Request for Bids Open - National 148,960.00 0.00 Implementati 2020-02-28 2020-03-04 2020-03-19 2020-03-27 2020-04-13 2020-06-12 en línea de base del programa Evaluation Capacity at Envelope on de capacitación docente en MINEDUC lectura y escritura BIRF-8542-LPN-NC-2020- 006 / Servicio de Component 2: Strengthening Pending levantamiento de información Planning, Management and Single Stage - One IBRD / 85420 Post Request for Bids Open - National 444,640.00 0.00 Implementati 2020-04-20 2020-04-27 2020-05-18 2020-05-25 2020-06-09 2020-07-09 para la evaluación de impacto Evaluation Capacity at Envelope on programa de capacitación MINEDUC docente en lectura y escritura BIRF-8542-LPN-NC-2020- 007 / Servicio de Component 2: Strengthening Pending levantamiento de información Planning, Management and Single Stage - One IBRD / 85420 Post Request for Bids Open - National 315,000.00 0.00 Implementati 2020-04-13 2020-04-18 2020-05-06 2020-05-14 2020-06-01 2020-07-31 y diagnóstico y línea de base Evaluation Capacity at Envelope on para la ejecución de planes de MINEDUC mejora BIRF-8542-LPN-NC-2020- Component 2: Strengthening 008 / Servicio de Pending Planning, Management and Single Stage - One levantamiento de información IBRD / 85420 Post Request for Bids Open - National 210,000.00 0.00 Implementati 2020-05-18 2020-05-26 2020-06-16 2020-06-26 2020-07-14 2020-08-13 Evaluation Capacity at Envelope para la evaluación de impacto on MINEDUC de planes de mejora BIRF-8542-LPN-NC-2020- 009 / Servicio de Component 2: Strengthening Pending levantamiento de información Planning, Management and Single Stage - One IBRD / 85420 Post Request for Bids Open - National 319,200.00 0.00 Implementati 2020-02-20 2020-02-27 2020-03-13 2020-03-20 2020-04-02 2020-06-01 en línea de base para la Evaluation Capacity at Envelope on evaluación de impacto de MINEDUC Teaching at the right level BIRF-8542-LPN-NC-2020- Component 2: Strengthening 010 / Servicio de Pending Planning, Management and Single Stage - One levantamiento de información IBRD / 85420 Post Request for Bids Open - National 319,200.00 0.00 Implementati 2020-05-15 2020-05-22 2020-06-09 2020-06-19 2020-07-07 2020-08-06 Evaluation Capacity at Envelope para la evaluación de impacto on MINEDUC de Teaching at the right level BIRF-8542-CD-NC-2020- 011 / Producción de contenidos educativos para la Component 1: Improving Pending plataforma de Educa Contigo, IBRD / 85420 school services in Targeted Post Direct Selection Direct 392,334.00 0.00 Implementati 2020-11-12 2020-11-17 2020-12-23 2021-07-01 continuidad del programa de Circuits on teleducación "Aprender la Tele" BIRF-8542-LPN-NC-2021- 012 / Capacitación para el Component 1: Improving Under Single Stage - One Desarrollo de Destrezas para IBRD / 85420 school services in Targeted Post Request for Bids Open - National 481,000.00 0.00 Implementati 2021-06-02 2021-06-11 2021-06-07 2021-06-14 2021-07-05 2021-07-12 2021-07-21 2021-12-28 Envelope la Vida y el Trabajo en Jóvenes Circuits on de BT y BTP CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BIRF-8542-SCC-CF-2016- 001 / Estudio de Suelos de Component 1: Improving Consultant Under proyectos UEMs de la Zona 5: IBRD / 85420 school services in Targeted Post Qualification Open - National 31,920.00 33,891.20 2016-07-26 2016-04-19 2016-08-16 2016-09-29 2016-10-03 2016-10-02 2016-10-20 2016-10-21 2016-11-20 Implementation Mocache y Valencia 1 (Vicente Circuits Selection Rocafuerte) BIRF-8542-SBCC-CF-2016- Component 2: Strengthening 012 / Desarrollo de Software: Planning, Management and Quality And Cost- IBRD / 85420 Post Open - International 226,000.00 0.00 Canceled 2016-12-19 2017-09-26 2017-02-09 2017-03-17 2017-04-14 2017-05-05 2017-05-21 2017-06-16 2017-12-13 Gestión de Inteligencia de Evaluation Capacity at Based Selection Negocios MINEDUC Page 4 BIRF-8542-SBCC-CF-2016- Component 2: Strengthening 013 / Desarrollo de Software: Planning, Management and Quality And Cost- IBRD / 85420 Prior Open - International 632,016.00 0.00 Canceled 2016-12-09 2017-01-13 2017-03-03 2017-03-31 2017-04-21 2017-05-07 2017-06-02 2018-06-02 Gestión de Instituciones y Evaluation Capacity at Based Selection Establecimientos Educativos MINEDUC BIRF-8542-SBCC-CF-2016- Component 2: Strengthening 014 / Desarrollo de Software: Planning, Management and Quality And Cost- IBRD / 85420 Prior Open - International 621,500.00 0.00 Canceled 2016-12-05 2017-01-13 2017-03-03 2017-03-31 2017-04-21 2017-05-07 2017-06-02 2018-06-02 Gestión de Logística y Evaluation Capacity at Based Selection Operaciones MINEDUC BIRF-8542-SBCC-CF-2016- 001 / Fiscalización de la Construcción de las UEM Mayores San Pedro (Santa Component 1: Improving Quality And Cost- Lucía) en la parroquia y IBRD / 85420 school services in Targeted Post Open - National 449,804.01 417,756.04 Signed 2016-07-18 2016-09-23 2016-08-08 2017-02-22 2017-04-20 2017-03-31 2017-05-22 2017-04-14 2017-09-28 2017-04-28 2017-10-11 2017-05-24 2018-04-18 2018-03-20 Based Selection cantón Santa Lucía y Ala 21 Circuits (UEM Nueva Milagro) en la parroquia y cantón Milagro, provincia de Guayas BIRF-8542-SBCC-CF-2016- 002 / Fiscalización de la Repotenciación de las Unidades Educativas Component 1: Improving Quality And Cost- Malchinguí en la parroquia IBRD / 85420 school services in Targeted Post Open - International 363,137.68 0.00 Canceled 2016-12-01 2016-12-01 2016-12-03 2017-03-31 2017-04-20 2017-04-28 2017-05-22 2017-05-13 2017-07-17 2017-05-27 2017-06-22 2018-04-18 Based Selection Malchingui, cantón Pedro Circuits Moncayo y Natalia Jarrín en la parroquia y cantón Cayambe, provincia de Pichincha BIRF-8542-SBCC-CF-2016- 003 / Fiscalización de la Construcción de UEM: Mitad del Mundo (UNASUR) en la Component 1: Improving Quality And Cost- parroquia San Antonio, cantón IBRD / 85420 school services in Targeted Post Open - International 453,765.05 429,066.98 Signed 2016-12-01 2016-12-01 2016-12-03 2017-03-17 2017-05-24 2017-04-14 2017-06-22 2017-05-05 2017-10-03 2017-05-21 2017-10-20 2017-06-16 2017-12-04 2018-04-12 Based Selection Quito y Cangahua en la Circuits parroquia Cangahua, cantón Cayambe de la provincia de Pichincha BIRF-8542-SBCC-CF-2016- 004 / Fiscalización de la Construcción de UEM; Component 1: Improving Valencia 1 (Vicente Quality And Cost- IBRD / 85420 school services in Targeted Post Open - International 472,597.92 429,066.97 Signed 2016-12-01 2016-12-01 2016-12-03 2017-03-17 2017-05-24 2017-04-14 2017-06-21 2017-05-05 2017-10-12 2017-05-21 2017-12-29 2017-06-16 2018-04-18 2018-04-12 Rocafuerte), en la parroquia Based Selection Circuits Valencia y Nuevo Mocache en parroquia y cantón Mocache en la provincia de Los Ríos BIRF-8542-SCC-CF-2016- Component 1: Improving Consultant 002 / Estudio de Suelos de Under IBRD / 85420 school services in Targeted Post Qualification Open - National 31,920.00 0.00 2016-04-19 2016-04-19 2016-09-06 2016-09-29 2016-10-05 2016-10-03 2016-10-19 2016-10-21 2016-11-21 proyectos UEMs de las Zonas Implementation Circuits Selection 2 y 9: Unasur y Cangahua BIRF-8542-SBCC-CF-2017- Component 2: Strengthening 015 / Consultoría de Planning, Management and Quality And Cost- Desarrollo en la Creación de IBRD / 85420 Post Open - International 224,000.00 0.00 Canceled 2017-05-29 2017-05-29 2017-06-19 2017-07-23 2017-08-22 2017-09-21 2017-10-26 2017-11-30 2018-06-28 Evaluation Capacity at Based Selection Una Project Management MINEDUC Office (PMO) BIRF-8542-SBCC-CF-2017- 016 / Consultoría de Intervención en la Infraestructura Existente y Component 1: Improving Quality And Cost- Propuesta para la IBRD / 85420 school services in Targeted Post Open - National 89,600.00 135,385.79 Signed 2017-11-29 2017-12-07 2017-12-19 2018-01-18 2018-01-18 2018-06-08 2018-03-19 2019-07-09 2018-03-26 2018-09-27 2018-03-31 2018-11-14 2018-04-18 2019-09-04 2018-07-17 Based Selection Repotenciación de la Unidad Circuits Educativa José María Velasco Ibarra, ubicada en el Cantón Milagro, Provincia de Guayas BIRF-8542-SBCC-CF-2018- 017 / Consultoría para el Levantamiento de Información en la Comunidad Educativa y Component 2: Strengthening Análisis de Resultados de Planning, Management and Quality And Cost- IBRD / 85420 Post Open - International 445,000.00 0.00 Canceled 2018-02-23 2018-02-26 2018-03-16 2018-04-20 2018-05-18 2018-06-08 2018-06-24 2018-07-29 2020-07-28 Proyecto de Entrega de Evaluation Capacity at Based Selection Computadores a Docentes del MINEDUC Proyecto Apoyo a la Reforma Educativa en los Circuitos Focalizados. BIRF-8542-SBCC-CF-2018- 018 / Consultoría de intervención en la Infraestructura existente y Component 1: Improving Quality And Cost- propuesta para la IBRD / 85420 school services in Targeted Post Open - National 92,051.91 102,953.39 Signed 2018-03-09 2018-03-12 2018-03-19 2018-03-28 2018-04-26 2018-08-20 2018-05-26 2018-09-18 2018-06-11 2018-10-15 2018-06-22 2018-12-27 2018-07-18 2019-09-04 2018-10-16 Based Selection Repotenciación de la Unidad Circuits Educativa 23 de Junio, ubicada en el cantón Baba, provincia de Los Ríos. BIRF-8542-SBCC-CF-2018- 019 / Consultoría de intervención en la infraestructura existente y Component 1: Improving propuesta para la Quality And Cost- IBRD / 85420 school services in Targeted Post Open - National 115,064.89 0.00 Canceled 2018-03-16 2018-03-26 2018-05-03 2018-05-31 2018-06-15 2018-06-28 2018-07-26 2018-10-24 repotenciación de la Unidad Based Selection Circuits Educativa Nicolás Infante Díaz, ubicada en el cantón Quevedo, provincia de Los Ríos BIRF-8542-SBCC-CF-2018- 020 / Consultoría de intervención en la infraestructura existente y Component 1: Improving Quality And Cost- propuesta para la IBRD / 85420 school services in Targeted Post Open - National 138,077.87 0.00 Canceled 2018-03-23 2018-04-02 2018-05-10 2018-06-07 2018-06-21 2018-07-04 2018-08-01 2018-10-30 Based Selection Repotenciación de la Unidad Circuits Educativa Ángel Polibio Chávez en el cantón Guaranda, provincia de Bolívar. Page 5 BIRF-8542-SBCC-CF-2018- 021 / Consultoría de la intervención en la infraestructura existente y Component 1: Improving Quality And Cost- propuesta para la IBRD / 85420 school services in Targeted Post Open - National 115,064.89 0.00 Canceled 2018-03-30 2018-04-09 2018-05-17 2018-06-14 2018-06-28 2018-07-10 2018-08-07 2018-11-05 Based Selection Repotenciación de la Unidad Circuits Educativa Quevedo, ubicada en el cantón Quevedo, provincia de Los Ríos BIRF-8542-SBCC-CF-2018- 022 / Consultoría de intervención en la infraestructura existente y Component 1: Improving propuesta para la Quality And Cost- IBRD / 85420 school services in Targeted Post Open - National 92,051.91 0.00 Canceled 2018-04-05 2018-04-15 2018-05-23 2018-06-20 2018-07-04 2018-07-17 2018-08-14 2018-11-12 Repotenciación de la Unidad Based Selection Circuits Educativa Seis de Octubre, ubicada en el cantón Ventanas, provincia de Los Ríos BIRF-8542-SBCC-CF-2018- Component 2: Strengthening 023 / Consultoría para la Planning, Management and Quality And Cost- Implementación del Almacén IBRD / 85420 Post Open - International 291,200.00 298,586.40 Signed 2018-04-06 2018-06-13 2018-04-27 2018-08-09 2018-05-20 2019-08-22 2018-06-17 2019-11-05 2018-07-08 2019-11-19 2018-07-22 2020-05-04 2018-08-26 2020-06-25 2019-03-24 Evaluation Capacity at Based Selection de Datos Institucional del MINEDUC Ministerio de Educación BIRF-8542-SBCC-CF-2018- 026 / Consultoría de Intervención en la Infraestructura Existente y Component 1: Improving Quality And Cost- Propuesta para la IBRD / 85420 school services in Targeted Post Open - National 58,843.46 92,724.80 Signed 2018-05-22 2018-04-27 2018-06-11 2018-05-22 2018-07-06 2018-10-15 2018-08-05 2018-11-13 2018-08-21 2018-11-23 2018-09-01 2019-01-13 2018-09-25 2019-08-08 2018-12-14 Based Selection Repotenciación de la Unidad Circuits Educativa Surupucyu, ubicada en el cantón Guaranda, provincia de Bolívar BIRF-8542-SBCC-CF-2018- 027 / Consultoría de Intervención en la Infraestructura Existente y Component 1: Improving Propuesta para la Quality And Cost- IBRD / 85420 school services in Targeted Post Open - National 58,843.46 92,724.80 Signed 2018-05-22 2018-04-27 2018-06-11 2018-05-22 2018-07-04 2018-10-12 2018-08-01 2019-11-13 2018-08-15 2018-11-23 2018-08-26 2018-12-20 2018-09-17 2019-08-08 2018-12-06 Repotenciación de la Unidad Based Selection Circuits Educativa Dolores Cacuango, ubicada en el cantón Cayambe, provincia de Pichincha BIRF-8542-SBCC-CF-2018- 029 / Consultoría para el Component 2: Strengthening Levantamiento de Información Planning, Management and Quality And Cost- en la Comunidad Educativa y IBRD / 85420 Prior Open - International 560,663.39 0.00 Canceled 2018-05-28 2018-08-07 2018-06-18 2018-08-28 2018-07-23 2019-11-07 2018-08-20 2020-01-06 2018-09-10 2018-09-26 2018-10-24 2020-04-06 Evaluation Capacity at Based Selection Análisis de Resultados del MINEDUC Proyecto de Entrega de Computadores a Docentes BIRF-8542-SBCC-CF-2018- 030 / Consultoría de Intervención en la infraestructura existente y propuesta para la Component 1: Improving Quality And Cost- Repotenciación de la Unidad IBRD / 85420 school services in Targeted Post Open - National 168,574.63 239,164.80 Signed 2018-05-31 2018-06-14 2018-06-21 2018-06-22 2018-07-26 2019-10-19 2018-08-23 2018-11-19 2018-09-13 2018-12-10 2018-09-27 2019-02-12 2018-10-29 2019-08-08 2019-01-27 Based Selection Educativa Quevedo y Unidad Circuits Educativa Nicolás Infante Díaz, ubicadas en el cantón Quevedo, provincia de Los Ríos BIRF-8542-SBCC-CF-2018- 031 / Consultoría de Intervención en infraestructura existente y propuesta para la Component 1: Improving Quality And Cost- Repotenciación de la Unidad IBRD / 85420 school services in Targeted Post Open - National 174,500.35 0.00 Canceled 2018-06-08 2018-06-11 2018-06-29 2018-06-27 2018-08-03 2018-08-31 2018-09-21 2018-10-05 2018-11-09 2019-02-07 Based Selection Educativa Babahoyo, en el Circuits cantón Babahoyo, provincia de Los Ríos y Unidad Educativa Eugenio Espejo, en el cantón Baba, provincia de Los Ríos BIRF-8542-SBCC-CF-2018- 032 / Consultoría de Intervención en infraestructura existente y propuesta para Component 1: Improving Repotenciación de Unidad Quality And Cost- IBRD / 85420 school services in Targeted Post Open - National 187,457.92 215,138.56 Signed 2018-06-14 2018-07-17 2018-07-05 2018-08-01 2018-08-09 2018-11-19 2018-09-06 2018-12-19 2018-09-27 2019-01-29 2018-10-11 2019-03-26 2018-11-15 2019-09-03 2019-02-23 Educativa Ángel Polibio Based Selection Circuits Chávez, en el cantón Guaranda provincia de Bolívar y Unidad Educativa Anexa Milagro, en el cantón Milagro provincia de Guayas BIRF-8542-SBCC-CF-2018- 035 / Consultoría de Estudios Integrales de Implantación y Repotenciación de las Component 1: Improving Quality And Cost- Unidades Educativas: San IBRD / 85420 school services in Targeted Post Open - National 269,556.50 0.00 Canceled 2018-06-14 2018-07-12 2018-06-29 2018-09-12 2018-08-07 2018-09-06 2018-09-24 2018-10-01 2018-11-05 2019-02-18 Based Selection Camilo y José Rodríguez en el Circuits cantón Quevedo e Isla de Bejucal en el cantón Baba, provincia de Los Ríos. BIRF-8542-SBCC-CF-2018- 036 / Consultoría de Estudios Complementarios de Implantación y Repotenciación de las Unidades Educativas Component 1: Improving Quality And Cost- Abdón Calderón y Guillermo IBRD / 85420 school services in Targeted Post Open - National 151,773.74 0.00 Canceled 2018-07-03 2018-07-20 2018-07-24 2018-09-24 2018-08-30 2018-09-28 2018-10-17 2018-10-23 2018-11-21 2019-02-04 Based Selection Durán en el cantón Milagro, Circuits provincia de Guayas y Unidad Educativa 10 de Agosto en el cantón Montalvo, provincia de Los Ríos Page 6 BIRF-8542-SBCC-CF-2018- 037 / Contratación de Estudios Integrales de Implantación y Repotenciación de la Unidad Educativa 7 de Component 1: Improving Quality And Cost- Octubre, ubicada en el cantón IBRD / 85420 school services in Targeted Post Open - National 212,297.88 0.00 Canceled 2018-07-16 2018-07-20 2018-08-02 2018-08-23 2018-09-12 2018-10-11 2018-10-29 2018-11-05 2018-12-10 2019-03-25 Based Selection Quevedo, provincia de Los Circuits Ríos y Unidad Educativa Guaranda, ubicada en el cantón Guaranda, provincia de Bolívar BIRF-8542-SBCC-CF-2018- 038 / Contratación de Estudios Complementarios de Implantación y Repotenciación de las Unidades Educativas: Component 1: Improving Quality And Cost- 29 de Agosto y Darío Guevara, IBRD / 85420 school services in Targeted Post Open - National 151,647.74 0.00 Canceled 2018-07-30 2018-07-20 2018-08-17 2018-08-31 2018-09-26 2018-10-26 2018-11-13 2018-11-19 2018-12-18 2019-03-03 Based Selection ubicadas en el cantón Circuits Babahoyo y Unidad Educativa 24 de Mayo, ubicada en el cantón Quevedo, en la provincia de Los Ríos. BIRF-8542-SBCC-CF-2018- 039 / Contratación de Consultoría para el Component 2: Strengthening Levantamiento de Procesos e Planning, Management and Quality And Cost- Under IBRD / 85420 Post Open - International 833,271.60 0.00 2018-09-05 2019-05-08 2018-09-19 2019-06-20 2018-10-14 2019-12-11 2018-11-11 2018-11-26 2018-12-10 2019-01-07 2020-06-30 Implementación de una Evaluation Capacity at Based Selection Implementation Solución Tecnológica que MINEDUC facilite la Gestión Integral de Instituciones Educativas BIRF-8542-SBCC-CF-2019- 041 / Consultoría para el Component 2: Strengthening levantamiento de procesos de Planning, Management and Quality And Cost- implementación de una IBRD / 85420 Prior Open - International 1,339,570.40 0.00 Canceled 2019-06-17 2019-07-30 2019-07-08 2019-08-07 2019-08-12 2019-09-09 2019-09-30 2019-10-21 2019-11-25 2020-12-19 Evaluation Capacity at Based Selection solución tecnológica que MINEDUC facilite la gestión integral de estudiantes BIRF-8542-SBCC-CF-2019- 042 / Consultoría para el Estudio de pertinencia de la Component 1: Improving Quality And Cost- Under oferta de Bachillerato Técnico IBRD / 85420 school services in Targeted Post Open - National 156,800.00 0.00 2019-06-14 2019-06-18 2019-07-05 2019-11-18 2019-08-08 2019-09-05 2019-09-26 2019-10-10 2019-11-14 2020-11-13 Based Selection Implementation del Ecuador y la construcción Circuits de un modelo de ordenamiento BIRF-8542-SBCC-CF-2019- 043 / Consultoría para la definición de estándares educativos, levantamiento de Component 1: Improving Quality And Cost- diagnóstico y plan de IBRD / 85420 school services in Targeted Post Open - International 39,406,907.00 0.00 Canceled 2019-06-24 2019-07-15 2019-08-15 2019-09-12 2019-10-03 2019-10-17 2019-11-21 2020-11-20 Based Selection intervención para 197 Circuits instituciones educativas especializadas fiscales a nivel nacional BIRF-8542-SCC-CF-2019- 003 / Elaboración de estudios y diseño para la implementación Component 1: Improving Consultant arquitectónica integral de la IBRD / 85420 school services in Targeted Post Qualification Open - National 91,599.26 0.00 Canceled 2019-06-10 2019-07-30 2019-07-01 2019-08-23 2019-07-30 2019-08-14 2019-09-04 2019-11-23 Unidad de Educación Circuits Selection Especializada Vicente Rocafuerte - Obra Nueva, ubicada en el cantón Milagro, provincia de Guayas BIRF-8542-SBCC-CF-2019- 044 / Consultoría para Definición de Estándares Component 2: Strengthening Educativos, Levantamiento de Planning, Management and Quality And Cost- Diagnóstico y Plan de IBRD / 85420 Post Open - International 394,069.67 0.00 Canceled 2019-09-20 2019-10-08 2019-10-20 2019-11-17 2019-11-27 2019-12-05 2019-12-27 2020-12-26 Evaluation Capacity at Based Selection Intervención para 107 MINEDUC Instituciones Educativas Especializadas Fiscales a Nivel Nacional BIRF-8542-SBCC-CF-2019- Component 2: Strengthening 046 / Consultoría para el Planning, Management and Quality And Cost- levantamiento de información IBRD / 85420 Post Open - National 134,400.00 0.00 Canceled 2019-10-04 2019-10-10 2019-10-23 2019-11-20 2019-11-28 2019-12-03 2019-12-22 2020-12-21 Evaluation Capacity at Based Selection cualitativa capacitación y MINEDUC formación de docentes BIRF-8542-SBCC-CF-2019- Component 2: Strengthening 048 / Consultoría para el Planning, Management and Quality And Cost- Pending desarrollo de contenidos y IBRD / 85420 Post Open - National 145,600.00 0.00 2020-01-15 2020-02-05 2020-03-04 2020-04-01 2020-04-15 2020-04-23 2020-05-28 2020-11-24 Evaluation Capacity at Based Selection Implementation virtualización de Evaluación MINEDUC Educativa BIRF-8542-SBCC-CF-2019- Component 2: Strengthening 049 / Consultoría para la Planning, Management and Quality And Cost- Under Implementación y IBRD / 85420 Post Open - International 300,000.00 0.00 2019-09-25 2019-11-17 2019-10-02 2019-12-09 2019-10-31 2019-11-28 2019-12-08 2019-12-15 2019-12-29 2020-11-23 Evaluation Capacity at Based Selection Implementation acompañamiento para la MINEDUC ejecución de Planes de Mejora BIRF-8542-SBCC-CF-2019- 051 / Fiscalización de la Repotenciación de las Unidades Educativas Component 1: Improving Quality And Cost- Under Malchinguí en la parroquia IBRD / 85420 school services in Targeted Post Open - National 462,956.82 0.00 2019-12-16 2019-12-16 2019-12-17 2019-12-24 2020-01-07 2020-02-06 2020-02-13 2020-02-19 2020-03-04 2020-12-29 Based Selection Implementation Malchinguí, cantón Pedro Circuits Moncayo y Natalia Jarrín en la parroquia y cantón Cayambe, provincia de Pichincha BIRF-8542-SBCC-CF-2019- 052 / Fiscalización de la Repotenciación UEIB Surupucyu en la parroquia Component 1: Improving Guanujo, cantón Guaranda, Quality And Cost- Under IBRD / 85420 school services in Targeted Post Open - National 349,870.33 0.00 2019-12-16 2019-12-19 2019-12-18 2019-12-25 2020-01-08 2020-02-07 2020-02-14 2020-02-20 2020-03-05 2020-11-30 provincia de Bolívar y de la UE Based Selection Implementation Circuits Dolores Cacunago en la parroquia Cangahua, cantón Cangahua, provincia de Pichincha Page 7 BIRF-8542-SBCC-CF-2019- 053 / Fiscalización de la Repotenciación UE José María Velasco Ibarra en la parroquia Component 1: Improving Quality And Cost- Under Milagro, cantón Milagro, IBRD / 85420 school services in Targeted Post Open - National 465,515.56 0.00 2019-12-17 2019-12-20 2019-12-31 2019-12-25 2020-02-04 2020-02-11 2020-02-15 2020-03-09 2020-04-02 2020-12-28 Based Selection Implementation provincia de Guayas y de la UE Circuits 23 de Junio en la parroquia Baba, cantón Baba, provincia de Los Ríos BIRF-8542-SBCC-CF-2019- 054 / Fiscalización de la Repotenciación UE Nicolás Infante Díaz en la parroquia Component 1: Improving Quality And Cost- Under San Camilo, cantón Quevedo, IBRD / 85420 school services in Targeted Post Open - National 464,748.82 0.00 2019-12-17 2019-12-19 2019-12-18 2019-12-26 2020-01-08 2020-12-28 2020-02-05 2021-02-08 2020-02-12 2020-02-18 2020-03-03 2020-12-13 Based Selection Implementation provincia de Los Ríos y de la Circuits UE Quevedo en la parroquia 24 de Mayo, cantón Quevedo, provincia de Los Ríos BIRF-8542-SBCC-CF-2019- 055 / Fiscalización de la Repotenciación UE Ángel Polibio Chávez en la parroquia Component 1: Improving Quality And Cost- Ángel Polibio Chávez, cantón IBRD / 85420 school services in Targeted Post Open - National 467,755.56 0.00 Canceled 2019-12-18 2019-12-17 2019-12-20 2019-12-24 2020-01-17 2020-02-14 2020-02-21 2020-02-27 2020-03-12 2020-12-07 Based Selection Guaranda, provincia de Bolívar Circuits y de la UE Anexa Milagro en la parroquia Milagro, cantón Milagro, provincia del Guayas BIRF-8542-SBCC-CF-2020- 056 / Consultoría para la Component 2: Strengthening Evaluación Cuantitativa de los Planning, Management and Quality And Cost- Under IBRD / 85420 Post Open - National 134,400.00 0.00 2020-02-18 2020-03-09 2020-02-28 2020-03-27 2020-03-23 2020-04-20 2020-05-04 2020-05-25 2020-06-08 2020-11-05 Programas de Capacitación en Evaluation Capacity at Based Selection Implementation Áreas Disciplinares y MINEDUC Maestrías BIRF-8542-SBCC-CF-2020- Component 2: Strengthening 057 / Consultoría para la Planning, Management and Quality And Cost- Pending Evaluación Cualitativa de la IBRD / 85420 Post Open - National 134,000.00 0.00 2020-03-09 2020-03-30 2020-04-20 2020-05-18 2020-05-28 2020-06-19 2020-07-01 2020-09-29 Evaluation Capacity at Based Selection Implementation Capacitación en Bachillerato MINEDUC Técnico BIRF-8542-SBCC-CF-2020- Component 2: Strengthening 058 / Consultoría para la Planning, Management and Quality And Cost- Under IBRD / 85420 Post Open - National 336,000.00 0.00 2020-02-24 2020-03-17 2020-03-16 2020-03-31 2020-04-02 2020-12-30 2020-04-30 2020-05-08 2020-06-02 2020-06-26 2020-11-23 Evaluación Cualitativa del Evaluation Capacity at Based Selection Implementation Modelo Integral UEM MINEDUC BIRF-8542-SCC-CF-2019- 004 / Auditoría de Component 2: Strengthening Consultant Verificación de Transporte del Planning, Management and Under IBRD / 85420 Post Qualification Open - National 67,200.00 0.00 2020-03-20 2020-05-17 2020-04-06 2020-09-24 2020-04-20 2020-05-07 2020-05-20 2020-11-16 Proyecto Apoyo a la Reforma Evaluation Capacity at Implementation Selection Educativa en los Circuitos MINEDUC Focalizados (PARECF) BIRF-8542-SBCC-CF-2019- Component 2: Strengthening 047 / Consultoría Planning, Management and Quality And Cost- levantamiento de información IBRD / 85420 Post Open - National 134,400.00 0.00 Canceled 2019-10-04 2019-10-11 2019-10-22 2019-11-19 2019-11-27 2019-12-02 2019-12-21 2020-12-20 Evaluation Capacity at Based Selection cualitativa capacitación de MINEDUC Bachillerato Técnico BIRF-8542-SBCC-CF-2018- 028 / Consultoría para el levantamiento de información en la Comunidad Educativa y Component 1: Improving Quality And Cost- Análisis de Resultados de la IBRD / 85420 school services in Targeted Post Open - National 180,000.00 0.00 Canceled 2018-05-10 2018-05-22 2018-06-19 2018-07-19 2018-08-09 2018-08-20 2018-09-13 2020-02-25 Based Selection Implementación de Evaluación Circuits Mixta de la Intervención en Infraestructura del Proyecto PARECF BIRF-8542-SBMC-CF-2020- 001 / Contratación de Auditoría Financiera a los Component 2: Strengthening Estados Financieros al 31 de Planning, Management and Least Cost IBRD / 85420 Post Open - National 30,000.00 0.00 Canceled 2020-03-12 2020-03-18 2020-03-27 2020-04-10 2020-04-15 2020-04-21 2020-04-29 2020-06-28 diciembre de 2019 del Evaluation Capacity at Selection Proyecto Apoyo a la Reforma MINEDUC Educativa en los Circuitos Focalizados (PARECF) BIRF-8542-SBCC-CF-2019- 050 / Consultoría para Definición de Estándares Educativos, Levantamiento de Component 1: Improving Quality And Cost- Diagnóstico y Plan de IBRD / 85420 school services in Targeted Post Open - International 351,847.38 0.00 Canceled 2019-10-25 2019-11-13 2019-11-12 2019-11-22 2019-12-02 2019-12-30 2020-01-09 2020-01-28 2020-02-15 2020-12-11 Based Selection Intervención para Circuits Instituciones Educativas Especializadas Fiscales a Nivel Nacional BIRF-8542-SBCC-CF-2020- 061 / Fiscalización de la Repotenciación UE Ángel Component 1: Improving Quality And Cost- Under Polibio Chávez en la parroquia IBRD / 85420 school services in Targeted Post Open - National 250,808.89 0.00 2020-08-21 2020-09-05 2020-09-11 2020-09-18 2020-09-30 2020-11-11 2020-11-25 2020-12-10 2020-12-24 2021-11-19 Based Selection Implementation Ángel Polibio Chávez, cantón Circuits Guaranda , provincia de Bolívar INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BIRF-8542-SSF-CI-2016-002 / Consultor Especialista de Component 2: Strengthening Adquisiciones para el Proyecto Planning, Management and Under IBRD / 85420 Post Direct Selection Direct 84,672.00 0.00 2016-03-14 2016-03-18 2017-06-15 2019-09-03 Apoyo a la Reforma Educativa Evaluation Capacity at Implementation en los Circuitos Focalizados MINEDUC (PARECF) Page 8 BIRF-8542-SSF-CI-2016-001 / Consultor Individual Coordinador(a) de Component 2: Strengthening Seguimiento, Monitoreo y Planning, Management and Under IBRD / 85420 Post Direct Selection Direct 99,792.00 0.00 2016-03-14 2016-03-17 2016-06-15 2019-01-01 Evaluación del Proyecto Apoyo Evaluation Capacity at Implementation a la Reforma Educativa en los MINEDUC Circuitos Focalizados (PARECF) BIRF-8542-SSF-CI-2016-004 / Consultor Especialista de Component 2: Strengthening Gestión Social del Proyecto Planning, Management and Under IBRD / 85420 Post Direct Selection Direct 61,508.00 0.00 2016-03-14 2016-03-17 2016-06-15 2018-04-06 Apoyo a la Reforma Educativa Evaluation Capacity at Implementation en los Circuitos Focalizados MINEDUC (PARECF), BIRF-8542-3CV-CI-2016- 005 / Consultor Técnico Zonal para Seguimiento y Component 2: Strengthening Supervisión de Obras de Individual Planning, Management and Infraestructura en las Zonas 2 IBRD / 85420 Post Consultant Limited 27,337.00 24,408.00 Signed 2016-04-26 2016-04-26 2016-06-27 2016-06-21 2016-07-16 2016-07-22 2016-08-10 2016-08-10 2017-08-05 Evaluation Capacity at y 9 del Proyecto Apoyo a la Selection MINEDUC Reforma Educativa en los Circuitos Focalizados (PARECF) BIRF-8542-3CV-CI-2016- 006 / Consultor Técnico Zonal para Seguimiento y Component 2: Strengthening Supervisión de Obras de Individual Planning, Management and Infraestructura en las Zona 5 IBRD / 85420 Post Consultant Limited 27,883.00 18,306.00 Signed 2016-04-26 2017-03-03 2016-07-15 2017-03-07 2016-12-20 2017-04-10 2017-02-01 2017-05-05 2018-01-27 Evaluation Capacity at del Proyecto Apoyo a la Selection MINEDUC Reforma Educativa en los Circuitos Focalizados (PARECF) BIRF-8542-CD-CI-2016-007 / Asesoramiento en rediseño Component 2: Strengthening estructural de estándares Planning, Management and IBRD / 85420 Prior Direct Selection Direct 13,680.00 13,200.00 Signed 2017-01-31 2017-05-01 2017-02-06 2017-03-01 2017-05-23 2017-04-30 educativos sismo resistentes Evaluation Capacity at como consecuencia del MINEDUC terremoto de abril de 2016 BIRF-8542-SSF-CI-2016-003 / Consultor Especialista de Seguimiento de Gestión Component 1: Improving Under Financiera del Proyecto Apoyo IBRD / 85420 school services in Targeted Post Direct Selection Direct 75,600.00 0.00 2016-03-14 2016-03-22 2016-06-15 2018-09-03 Implementation a la Reforma Educativa en los Circuits Circuitos Focalizados (PARECF) BIRF-8542-CD-CI-2017-008 / Consultor Técnico para Component 2: Strengthening Individual Seguimiento y Supervisión de Planning, Management and IBRD / 85420 Prior Consultant Direct 9,112.32 9,112.32 Signed 2017-08-07 2017-08-15 2017-08-08 2017-08-10 2017-09-21 2017-08-16 2017-09-27 2017-12-31 Obras de la Sierra Ecuatoriana Evaluation Capacity at Selection (PARECF) - Agosto a MINEDUC diciembre de 2017 Component 2: Strengthening BIRF-8542-CD-CI-2017-009 Planning, Management and / Asesor Especialista de IBRD / 85420 Prior Direct Selection Direct 22,400.00 0.00 Canceled 2017-10-26 2017-11-15 2017-12-31 2018-12-31 Evaluation Capacity at Evaluación de Impacto MINEDUC Component 2: Strengthening BIRF-8542-3CV-CI-2017- Individual Planning, Management and 010 / Especialista de IBRD / 85420 Post Consultant Limited 22,400.00 0.00 Canceled 2017-11-30 2018-02-22 2017-12-05 2017-12-20 2018-01-03 2019-01-03 Evaluation Capacity at Evaluación de Impacto Selection MINEDUC BIRF-8542-SSF-CI-2017-011 / Contratación de Consultor Component 2: Strengthening Individual Individual Coordinadora de Planning, Management and IBRD / 85420 Prior Consultant Direct 61,180.00 61,180.01 Signed 2017-11-28 2017-12-08 2017-12-04 2017-12-15 2018-02-27 2017-12-22 2017-12-27 2019-07-15 Seguimiento, Monitoreo y Evaluation Capacity at Selection Evaluación para el Proyecto MINEDUC PARECF 2018-2019 BIRF-8542-SSF-CI-2017-012 Component 2: Strengthening / Contratación de Consultor Planning, Management and Individual Especialista de IBRD / 85420 Prior Direct Selection Direct 56,448.00 56,448.01 Signed 2017-11-28 2017-12-08 2017-12-04 2017-12-22 2017-12-27 2019-06-15 Evaluation Capacity at Adquisiciones para el Proyecto MINEDUC PARECF 2018-2019 BIRF-8542-SSF-CI-2017-013 / Contratación de Consultor Component 2: Strengthening Individual Especialista de Planning, Management and IBRD / 85420 Prior Direct Selection Direct 50,400.00 50,400.01 Signed 2017-11-28 2017-12-08 2017-12-04 2017-12-22 2017-12-27 2019-06-15 Seguimiento de Gestión Evaluation Capacity at Financiera para el Proyecto MINEDUC PARECF 2018-2019 BIRF-8542-SSF-CI-2017-014 Component 2: Strengthening / Contratación de Consultor/a Planning, Management and Individual Especialista de IBRD / 85420 Prior Direct Selection Direct 33,600.00 33,600.01 Signed 2017-11-28 2017-12-08 2017-12-04 2017-12-22 2017-12-27 2018-12-17 Evaluation Capacity at Gestión Social para el MINEDUC Proyecto PARECF 2018 BIRF-8542-CD-CI-2017-015 / Contratación de Consultor/a Component 2: Strengthening Técnico para Seguimiento y Planning, Management and Supervisión de Obras de IBRD / 85420 Prior Direct Selection Direct 27,336.96 27,336.01 Signed 2017-11-28 2017-12-08 2017-12-04 2017-12-22 2017-12-27 2018-12-17 Evaluation Capacity at Infraestructura en las Zonas MINEDUC de la Sierra Ecuatoriana para el Proyecto PARECF BIRF-8542-CD-CI-2017-016 / Contratación de Consultor/A Component 2: Strengthening Técnico para Seguimiento y Planning, Management and Supervisión de Obras de IBRD / 85420 Prior Direct Selection Direct 27,336.96 0.00 Canceled 2017-11-28 2017-12-08 2017-12-04 2017-12-22 2018-12-31 Evaluation Capacity at Infraestructura en las Zonas MINEDUC del Litoral Ecuatoriano para el Proyecto PARECF 2018 BIRF-8591-3CV-CI-2018- 017 / Consultor Técnico de Component 2: Strengthening Individual Seguimiento y Supervisón de Planning, Management and IBRD / 85420 Post Consultant Open 23,919.84 0.00 Canceled 2018-01-23 2018-02-05 2018-02-09 2018-02-19 2018-12-31 Estudios y Obras en las Zonas Evaluation Capacity at Selection de la Costa Ecuatoriana para MINEDUC el Proyecto PARECF 2018 Page 9 BIRF-8542-3CV-CI-2018- Component 2: Strengthening Individual 018 / Contratación de Planning, Management and IBRD / 85420 Post Consultant Limited 29,120.00 0.00 Canceled 2018-05-28 2018-06-12 2018-07-03 2018-07-24 2018-11-21 Consultoría de un Especialista Evaluation Capacity at Selection de Evaluación de Impacto MINEDUC BIRF-8542-3CV-CI-2018- Component 2: Strengthening Individual 019 / Contratación de Planning, Management and IBRD / 85420 Post Consultant Limited 11,640.00 0.00 Canceled 2018-10-22 2018-10-25 2018-11-01 2018-11-15 2018-12-30 Consultoría de un Especialista Evaluation Capacity at Selection de Evaluación de Impacto MINEDUC BIRF-8542-3CV-CI-2019- 016 / Consultor/a Individual Component 2: Strengthening Individual Coordinador/a de Planning, Management and IBRD / 85420 Prior Consultant Limited 38,304.00 0.00 Canceled 2019-02-15 2019-03-18 2019-02-18 2019-02-25 2019-03-06 2019-12-31 Seguimiento, Monitoreo y Evaluation Capacity at Selection Evaluación para el Proyecto MINEDUC PARECF 2019 BIRF-8542-3CV-CI-2019- Component 2: Strengthening 017 / Consultor/a Individual Individual Planning, Management and Under Especialista de Seguimiento IBRD / 85420 Post Consultant Limited 33,600.00 0.00 2019-02-15 2019-03-07 2019-02-18 2019-09-30 2019-02-25 2019-03-06 2019-12-31 Evaluation Capacity at Implementation de Gestión Financiera para el Selection MINEDUC Proyecto PARECF - 2019 BIRF-8542-CD-CI-2019-018 / Consultor Técnico para Component 2: Strengthening Seguimiento y Supervisión de Individual Planning, Management and Obras de Infraestructura en IBRD / 85420 Prior Consultant Direct 28,000.00 0.00 Canceled 2019-02-15 2019-04-01 2019-02-22 2019-02-27 2019-03-07 2020-01-01 Evaluation Capacity at las Zonas de la Sierra Selection MINEDUC Ecuatoriana para el Proyecto PARECF 2019 BIRF-8542-CD-CI-2019-019 Component 2: Strengthening Individual / Consultora Individual Planning, Management and Under IBRD / 85420 Post Consultant Direct 29,120.00 0.00 2019-02-15 2019-06-12 2019-02-22 2019-02-27 2019-03-07 2020-01-01 Especialista de Gestión Social Evaluation Capacity at Implementation Selection para el Proyecto PARECF MINEDUC BIRF-8542-3CV-CI-2019- 021 / Contratación de Component 2: Strengthening Individual Consultor/a Individual Planning, Management and IBRD / 85420 Post Consultant Limited 30,240.00 12,320.00 Signed 2019-03-25 2019-06-05 2019-03-28 2019-06-13 2019-04-04 2019-07-29 2019-04-13 2019-09-05 2020-01-08 Especialista de Evaluación de Evaluation Capacity at Selection Impacto 2 para el Proyecto MINEDUC PARECF 2019 BIRF-8542-3CV-CI-2019- Component 2: Strengthening Individual 022 / Contratación de Planning, Management and IBRD / 85420 Post Consultant Limited 21,560.00 9,240.00 Signed 2019-05-02 2019-07-17 2019-05-08 2019-08-20 2019-05-15 2019-09-20 2019-06-01 2019-10-15 2019-12-31 Especialista de Evaluación Evaluation Capacity at Selection Cualitativa MINEDUC BIRF-8542-3CV-CI-2019- 024 / Contratación de un Component 2: Strengthening Experto en Educación para la Individual Planning, Management and ejecución de la consultoría IBRD / 85420 Post Consultant Limited 71,680.00 0.00 Canceled 2019-06-04 2019-06-09 2019-06-16 2019-07-01 2019-12-28 Evaluation Capacity at para el desarrollo del Nuevo Selection MINEDUC Sistema de Evaluación Educativa (EE) BIRF-8542-3CV-CI-2019- 020 / Contratación de Component 2: Strengthening Individual Consultor/a Individual Planning, Management and IBRD / 85420 Post Consultant Limited 30,240.00 12,320.00 Signed 2019-03-25 2019-06-05 2019-05-17 2019-06-13 2019-05-24 2019-08-21 2019-06-02 2019-09-05 2020-02-27 Especialista de Evaluación de Evaluation Capacity at Selection Impacto 1 para el Proyecto MINEDUC PARECF 2019 BIRF-8542-CD-CI-2019-023 / Contratación de Consultor Component 1: Improving Individual Especialista de IBRD / 85420 school services in Targeted Post Direct Selection Direct 18,816.00 18,816.00 Signed 2019-05-29 2019-06-25 2019-06-02 2019-06-27 2019-07-01 2019-07-16 2019-12-28 Adquisiciones para el Proyecto Circuits PARECF para segundo semestre 2019 BIRF-8542-CD-CI-2019-025 Component 2: Strengthening / Contratación de un Planning, Management and consultor especialista de IBRD / 85420 Post Direct Selection Direct 36,960.00 36,960.00 Signed 2019-10-14 2019-12-09 2019-11-13 2019-12-11 2019-12-20 2019-12-15 2020-12-19 Evaluation Capacity at evaluación de impacto 1 – MINEDUC 2020 BIRF-8542-CD-CI-2019-026 Component 2: Strengthening / Contratación de un Planning, Management and consultor especialista de IBRD / 85420 Post Direct Selection Direct 36,960.00 36,960.00 Signed 2019-10-14 2019-12-09 2019-11-18 2019-12-11 2019-12-20 2019-12-15 2020-12-19 Evaluation Capacity at evaluación de impacto 2 – MINEDUC 2020 BIRF-8542-CD-CI-2019-027 Component 2: Strengthening / Contratación de un Planning, Management and IBRD / 85420 Post Direct Selection Direct 36,960.00 36,960.00 Signed 2019-10-18 2019-12-09 2019-11-22 2019-12-10 2019-12-21 2019-12-15 2020-12-20 consultor especialista de Evaluation Capacity at evaluación cualitativo – 2020 MINEDUC BIRF-8542-3CV-CI-2019- 028 / Contratación de Component 2: Strengthening Individual Consultor Individual Planning, Management and IBRD / 85420 Post Consultant Open 33,600.00 0.00 Canceled 2019-09-30 2019-10-16 2019-10-26 2019-12-07 2020-12-01 Desarrollador de Software y Evaluation Capacity at Selection Aplicaciones Informáticas para MINEDUC Integración BIRF-8542-3CV-CI-2019- Component 2: Strengthening Individual 029 / Contratación de Planning, Management and IBRD / 85420 Post Consultant Open 33,600.00 0.00 Canceled 2019-09-30 2019-10-20 2019-11-10 2019-12-15 2020-12-09 Consultor Especialista de Evaluation Capacity at Selection Desarrollo de Bases de Datos MINEDUC BIRF-8542-CD-CF-2019-045 Component 2: Strengthening / Consultoría para el diseño Planning, Management and Under IBRD / 85420 Post Direct Selection Direct 78,400.00 0.00 2019-10-11 2020-01-06 2019-10-21 2020-02-12 2019-12-16 2020-07-13 de la Política Nacional de Evaluation Capacity at Implementation Evaluación Educativa MINEDUC BIRF-8542-CD-CI-2019-031 Component 2: Strengthening / Consultoría Individual Planning, Management and Coordinador de Seguimiento, IBRD / 85420 Post Direct Selection Direct 38,640.00 38,640.00 Signed 2019-10-15 2019-12-06 2019-10-25 2019-12-11 2019-12-23 2019-12-14 2020-12-22 Evaluation Capacity at Monitoreo y Evaluación para el MINEDUC Proyecto PARECF 2020 Page 10 BIRF-8542-CD-CI-2019-032 Component 2: Strengthening / Contratación de Consultor Planning, Management and Individual Especialista de IBRD / 85420 Post Direct Selection Direct 37,632.00 37,632.00 Signed 2019-10-15 2019-12-09 2019-10-25 2019-12-11 2019-12-23 2019-12-14 2020-12-22 Evaluation Capacity at Adquisiciones para el Proyecto MINEDUC PARECF para 2020 BIRF-8542-CD-CI-2019-033 Component 2: Strengthening / Consultora Individual Planning, Management and Especialista de Gestión Social IBRD / 85420 Post Direct Selection Direct 33,600.00 33,600.00 Signed 2019-10-15 2019-12-09 2019-10-25 2019-12-12 2019-12-23 2019-12-14 2020-12-22 Evaluation Capacity at para el Proyecto PARECF para MINEDUC 2020 BIRF-8542-CD-CI-2019-034 / Consultor Técnico para Component 2: Strengthening Seguimiento y Supervisión de Planning, Management and Obras de Infraestructura en IBRD / 85420 Post Direct Selection Direct 33,600.00 33,600.00 Signed 2019-10-15 2019-12-09 2019-10-25 2019-12-11 2019-12-23 2019-12-14 2020-12-22 Evaluation Capacity at las Zonas de la Sierra MINEDUC Ecuatoriana para el Proyecto PARECF 2020 BIRF-8542-CD-CI-2019-035 / Consultor Técnico para Component 2: Strengthening Seguimiento y Supervisión de Planning, Management and Obras de Infraestructura en IBRD / 85420 Post Direct Selection Direct 33,600.00 0.00 Canceled 2019-10-15 2019-10-25 2019-12-09 2020-12-08 Evaluation Capacity at las Zonas de la Costa MINEDUC Ecuatoriana para el Proyecto PARECF 2020 BIRF-8542-3CV-CI-2019- 030 / Consultor Técnico para Component 2: Strengthening Seguimiento y Supervisión de Individual Planning, Management and Obras de Infraestructura en IBRD / 85420 Post Consultant Limited 8,400.00 0.00 Canceled 2019-09-20 2019-11-05 2019-09-23 2019-09-27 2019-10-03 2020-01-01 Evaluation Capacity at las Zonas de la Costa Selection MINEDUC Ecuatoriana para el Proyecto PARECF 2019 BIRF-8542-CD-CI-2019-036 Component 2: Strengthening / Consultor/a Individual Planning, Management and Especialista de Gestión IBRD / 85420 Post Direct Selection Direct 33,600.00 33,600.00 Signed 2019-10-15 2019-12-09 2019-10-25 2019-12-11 2019-12-23 2019-12-14 2020-12-22 Evaluation Capacity at Financiera para el Proyecto MINEDUC PARECF - 2020 BIRF-8542-3CV-CI-2019- Component 2: Strengthening 037 / Consultor/a Individual Individual Planning, Management and Especialista de Gestión IBRD / 85420 Post Consultant Limited 8,400.00 0.00 Canceled 2019-09-18 2019-10-29 2019-09-23 2019-09-26 2019-10-01 2019-12-30 Evaluation Capacity at Ambiental para el Proyecto Selection MINEDUC PARECF 2019 BIRF-8542-3CV-CI-2019- Component 2: Strengthening Individual 038 / Consultor/a Individual Planning, Management and IBRD / 85420 Post Consultant Limited 8,400.00 0.00 Canceled 2019-09-18 2019-09-20 2019-09-25 2019-10-01 2019-12-30 Analista Fiduciario para el Evaluation Capacity at Selection Proyecto PARECF 2019 MINEDUC BIRF-8542-CD-CI-2019-039 Component 2: Strengthening / Consultor/a Individual Planning, Management and Especialista de Gestión IBRD / 85420 Post Direct Selection Direct 33,600.00 0.00 Canceled 2019-10-15 2019-10-25 2019-12-23 2020-12-22 Evaluation Capacity at Ambiental para el Proyecto MINEDUC PARECF 2020 BIRF-8542-CD-CI-2019-040 Component 2: Strengthening / Consultor/a Individual Planning, Management and IBRD / 85420 Post Direct Selection Direct 33,600.00 0.00 Canceled 2019-10-15 2019-10-25 2019-12-23 2020-12-22 Analista Fiduciario para el Evaluation Capacity at Proyecto PARECF 2020 MINEDUC BIRF-8542-3CV-CI-2019- 041 / Consultoría para Component 2: Strengthening Individual levantamiento de análisis de Planning, Management and Under IBRD / 85420 Post Consultant Limited 5,040.00 0.00 2019-09-20 2020-10-27 2019-09-25 2019-09-30 2019-10-15 2019-12-03 involucrados y riesgos Evaluation Capacity at Implementation Selection reputacionales en obras del MINEDUC Proyecto PARECF BIRF-8542-CD-CI-2019-042 / Consultora Individual Component 2: Strengthening Individual Coordinador/a de Planning, Management and IBRD / 85420 Post Consultant Direct 6,440.00 6,440.00 Signed 2019-10-28 2019-10-29 2019-10-30 2019-10-30 2019-10-31 2019-10-31 2019-11-08 2019-11-13 2019-12-31 Seguimiento, Monitoreo y Evaluation Capacity at Selection Evaluación para el Proyecto MINEDUC PARECF 2019 BIRF-8542-CD-CI-2020-043 Component 2: Strengthening / Contratación de consultoría Planning, Management and Pending individual para el ajuste de la IBRD / 85420 Post Direct Selection Direct 20,160.00 0.00 2020-02-25 2020-03-06 2020-04-02 2020-06-01 Evaluation Capacity at Implementation herramienta TEACH al MINEDUC contexto ecuatoriano BIRF-8542-CD-CF-2020-059 / Contratación de Auditoría a los Estados Financieros al 31 Component 2: Strengthening de diciembre de 2019 del Planning, Management and Under Proyecto Apoyo a la Reforma IBRD / 85420 Post Direct Selection Direct 25,000.00 0.00 2020-02-10 2020-04-30 2020-03-13 2020-06-11 2020-04-03 2020-06-02 Evaluation Capacity at Implementation Educativa en los Circuitos MINEDUC Focalizados financiado con recursos del Préstamo BIRF- 8542-EC BIRF-8542-3CV-CI-2020- 045 / Contratación de Component 2: Strengthening Individual Consultor/a Individual Planning, Management and Under IBRD / 85420 Post Consultant Limited 25,200.00 0.00 2020-03-13 2020-06-10 2020-03-16 2020-03-23 2020-03-31 2020-12-31 Especialista de Gestión Evaluation Capacity at Implementation Selection Ambiental para el Proyecto MINEDUC PARECF 2020 BIRF-8542-3CV-CI-2020- Component 2: Strengthening Individual 046 / Consultor Individual Planning, Management and Under IBRD / 85420 Post Consultant Limited 20,160.00 0.00 2020-03-13 2020-06-10 2020-03-16 2020-03-23 2020-03-31 2020-12-31 Analista Fiduciario para el Evaluation Capacity at Implementation Selection Proyecto PARECF 2020 MINEDUC BIRF-8542-CD-CF-2020-060 / Consultoría para definición de estándares educativos, Component 1: Improving levantamiento de diagnóstico Under IBRD / 85420 school services in Targeted Post Direct Selection Direct 394,069.07 0.00 2020-04-23 2020-04-22 2020-05-03 2020-06-02 2020-05-25 2020-12-31 y plan de intervención para Implementation Circuits Instituciones Educativas Especializadas Fiscales a nivel nacional Page 11 BIRF-8542-3CV-CI-2020- Component 2: Strengthening 047 / Contratación de Individual Planning, Management and Under Consultor Especialista IBRD / 85420 Post Consultant Open 22,400.00 0.00 2020-04-21 2020-04-20 2020-05-11 2020-05-20 2020-06-01 2020-12-31 Evaluation Capacity at Implementation Informático en Desarrollo de Selection MINEDUC Aplicaciones BIRF-8542-3CV-CI-2020- Component 2: Strengthening Individual 048 / Contratación de Planning, Management and Under IBRD / 85420 Post Consultant Open 22,400.00 0.00 2020-04-21 2020-04-20 2020-05-11 2020-05-20 2020-06-01 2020-12-31 Consultor Especialista Evaluation Capacity at Implementation Selection Geoinformático MINEDUC BIRF-8542-3CV-CI-2020- 044 / Consultor Técnico Zonal para Seguimiento y Component 2: Strengthening Supervisión de Obras de Individual Planning, Management and Under Infraestructura en el Litoral IBRD / 85420 Post Consultant Limited 9,596.25 0.00 2020-08-21 2020-08-20 2020-08-26 2020-09-04 2020-09-17 2020-12-31 Evaluation Capacity at Implementation del Proyecto Apoyo a la Selection MINEDUC Reforma Educativa en los Circuitos Focalizados (PARECF) BIRF-8542-3CV-CI-2020- 049 / Consultor individual para el diseño de módulos para la enseñanza de lectura y Component 1: Improving Individual escritura dirigido a Under IBRD / 85420 school services in Targeted Post Consultant Limited 16,800.00 0.00 2020-08-21 2020-08-25 2020-09-04 2020-09-18 2020-10-08 2021-05-21 instituciones multigrado (uni, Implementation Circuits Selection bi y pluridocentes) del magisterio fiscal de las provincias de Esmeraldas y Manabí. BIRF-8542-3CV-CI-2020- 050 / Consultor para la formación de tutores virtuales para la enseñanza de lectura y Component 1: Improving Individual Under escritura en instituciones IBRD / 85420 school services in Targeted Post Consultant Limited 11,200.00 0.00 2020-08-21 2020-09-09 2020-09-04 2020-09-18 2020-10-05 2021-01-28 Implementation multigrado (uni, bi y Circuits Selection pluridocentes) del magisterio fiscal de las provincias de Esmeraldas y Manabí. BIRF-8542-3CV-CI-2020- 059 / Consultor Especialista Component 2: Strengthening de Seguimiento de Gestión Individual Planning, Management and Under Financiera del Proyecto Apoyo IBRD / 85420 Post Consultant Limited 28,788.75 0.00 2020-11-11 2020-11-26 2020-11-16 2020-11-27 2020-12-22 2021-12-22 Evaluation Capacity at Implementation a la Reforma Educativa en los Selection MINEDUC Circuitos Focalizados (PARECF) 2021. BIRF-85423CV-CI-2020-060 / Consultor Individual Analista Component 2: Strengthening Individual Fiduciario del Proyecto Apoyo Planning, Management and Under IBRD / 85420 Post Consultant Limited 24,324.52 0.00 2020-11-11 2020-11-26 2020-11-16 2020-11-27 2020-12-22 2021-12-22 a la Reforma Educativa en los Evaluation Capacity at Implementation Selection Circuitos Focalizados MINEDUC (PARECF) 2021 BIRF-8542-CD-CI-2020-054 / Consultor Individual Coordinador(a) de Component 2: Strengthening Individual Seguimiento, Monitoreo y Planning, Management and Under IBRD / 85420 Post Consultant Direct 38,640.00 0.00 2020-11-13 2020-11-26 2020-11-20 2020-12-02 2020-12-16 2021-12-16 Evaluación del Proyecto Apoyo Evaluation Capacity at Implementation Selection a la Reforma Educativa en los MINEDUC Circuitos Focalizados (PARECF) 2021 BIRF-8542-CD-CI-2020-052 Component 2: Strengthening Individual / Consultor Especialista de Planning, Management and Under IBRD / 85420 Post Consultant Direct 28,789.87 0.00 2020-11-12 2020-12-01 2020-11-20 2020-12-04 2020-12-15 2021-12-15 Evaluación de Impacto 2 - Evaluation Capacity at Implementation Selection 2021 MINEDUC BIRF-8542-CD-CI-2020-051 Component 2: Strengthening Individual / Consultor Especialista de Planning, Management and Under IBRD / 85420 Post Consultant Direct 28,789.87 0.00 2020-11-12 2020-12-01 2020-11-20 2020-12-04 2020-12-15 2021-12-15 Evaluación de Impacto 1 - Evaluation Capacity at Implementation Selection 2021 MINEDUC Component 2: Strengthening BIRF-8542-CD-CI-2020-053 Individual Planning, Management and Under / Consultor Especialista de IBRD / 85420 Post Consultant Direct 28,789.87 0.00 2020-11-12 2020-12-01 2020-11-20 2020-12-04 2020-12-15 2021-12-15 Evaluation Capacity at Implementation Evaluación Cualitativa Selection MINEDUC BIRF-8542-CD-CI-2020-055 / Consultor Individual Component 2: Strengthening Especialista de Adquisiciones Individual Planning, Management and Under para el Proyecto Apoyo a la IBRD / 85420 Post Consultant Direct 37,632.00 0.00 2020-11-13 2020-12-02 2020-11-20 2020-12-02 2020-12-16 2021-12-16 Evaluation Capacity at Implementation Reforma Educativa en los Selection MINEDUC Circuitos Focalizados (PARECF) 2021 BIRF-8542-CD-CI-2020-056 / Consultor Especialista de Component 2: Strengthening Individual Gestión Social del Proyecto Planning, Management and Pending IBRD / 85420 Post Consultant Direct 28,788.75 0.00 2020-11-13 2020-11-20 2020-12-02 2020-12-16 2021-12-16 Apoyo a la Reforma Educativa Evaluation Capacity at Implementation Selection en los Circuitos Focalizados MINEDUC (PARECF) 2021 BIRF-8542-CD-CI-2020-057 / Consultor Individual Component 2: Strengthening Individual Especialista de Gestión Planning, Management and Under IBRD / 85420 Post Consultant Direct 28,788.75 0.00 2020-11-13 2020-11-26 2020-11-20 2020-12-02 2020-12-16 2021-12-16 Ambiental del Proyecto Apoyo Evaluation Capacity at Implementation Selection a la Reforma Educativa en los MINEDUC Circuitos Focalizados 2021 BIRF-8542-CD-CI-2020-058 / Consultor Técnico Zonal para Seguimiento y Component 2: Strengthening Supervisión de Obras de Individual Planning, Management and Under Infraestructura en el Litoral IBRD / 85420 Post Consultant Direct 28,788.75 0.00 2020-11-13 2020-11-26 2020-11-20 2020-12-02 2020-12-16 2021-12-16 Evaluation Capacity at Implementation del Proyecto Apoyo a la Selection MINEDUC Reforma Educativa en los Circuitos Focalizados (PARECF) 2021 Page 12 BIRF-8542-CD-CF-2020-062 / Auditoría Financiera a los Component 2: Strengthening Estados Financieros al 31 de Planning, Management and Under diciembre de 2020 del IBRD / 85420 Post Direct Selection Direct 16,800.00 0.00 2020-11-16 2021-02-24 2020-11-30 2020-12-23 2021-03-08 Evaluation Capacity at Implementation Proyecto Apoyo a la Reforma MINEDUC Educativa en los Circuitos Focalizados (PARECF) BIRF-8542-3CV-CI-2021- 061 / Consultor Especialista Component 2: Strengthening Individual de Gestión Social del Proyecto Planning, Management and Under IBRD / 85420 Post Consultant Open 20,392.03 0.00 2021-04-01 2021-04-09 2021-04-12 2021-04-16 2021-04-23 2021-12-31 Apoyo a la Reforma Educativa Evaluation Capacity at Implementation Selection en los Circuitos Focalizados MINEDUC (PARECF) 2021 BIRF-8542-3CV-CI-2021- 062 / Contratación de un Guionista 2 en contenidos Component 1: Improving Individual Under educativos de Educación IBRD / 85420 school services in Targeted Post Consultant Open 9,408.00 0.00 2021-06-04 2021-06-02 2021-06-16 2021-06-21 2021-07-01 2021-12-28 Implementation General Básica para radio y Circuits Selection televisión para el programa de Teleducación 2021 BIRF-8542-3CV-CI-2021- 063 / Contratación de un Guionista 1 en contenidos Component 1: Improving Individual Under educativos de Bachillerato IBRD / 85420 school services in Targeted Post Consultant Open 9,408.00 0.00 2021-06-04 2021-06-02 2021-06-16 2021-06-21 2021-07-01 2021-12-28 Implementation General Unificado para radio y Circuits Selection televisión del programa de Teleducación 2021 BIRF-8542-3CV-CI-2021- 064 / Contratación de un Component 1: Improving Individual Editor - Masterizador - Under IBRD / 85420 school services in Targeted Post Consultant Open 9,408.00 0.00 2021-06-04 2021-06-02 2021-06-16 2021-06-21 2021-07-01 2021-12-28 Locutor para radio y televisión Implementation Circuits Selection del programa de Teleducación 2021 BIRF-8542-3CV-CI-2021- Component 1: Improving Individual 065 / Contratación de un Under IBRD / 85420 school services in Targeted Post Consultant Open 9,408.00 0.00 2021-06-04 2021-06-02 2021-06-16 2021-06-21 2021-07-01 2021-12-28 Pedagogo para el programa Implementation Circuits Selection de Teleducación 2021 BIRF-8542-3CV-CI-2021- 066 / Contratación de un Consultor Productor 1 en Component 1: Improving Individual Under contenidos de Educación IBRD / 85420 school services in Targeted Post Consultant Open 9,408.00 0.00 2021-06-04 2021-06-02 2021-06-16 2021-06-21 2021-07-01 2021-12-28 Implementation General Básica para el Circuits Selection programa de Teleducación 2021 BIRF-8542-3CV-CI-2021- 067 / Contratación de un Consultor Productor 2 en Component 1: Improving Individual Under contenidos de Bachillerato IBRD / 85420 school services in Targeted Post Consultant Open 9,408.00 0.00 2021-06-04 2021-06-02 2021-06-16 2021-06-21 2021-07-01 2021-12-28 Implementation General Unificado para el Circuits Selection programa de Teleducación 2021 Page 13 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan: Updated Procurement Plan, M 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project July 9, 2010 implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) III. Selection of Consultants July 9, 2010 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 July 9, 2010 PROCUREMENT Ethiopia : Second Agricultural Growth Project PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2017-11-13 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P148591 GPN Date: Project Name: Second Agricultural Growth Project Loan / Credit No: IDA / 56050 SNNPR - Agricultural Growth Program Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ET-SNPPR-AGP-36255-CW- RFB / Rehabilitation/Maintenance of vegitable and fruit nurseries Agricultural Public Support Single Stage - One 2018-09- IDA / 56050 Post Request for Bids Open - National 324,910.00 0.00 Canceled 2018-02-09 2018-02-14 2018-03-16 2018-04-15 2018-05-20 on 9 woredas /W/Genet, Services Envelope 17 Goreche, Melega, Gedeb, Bule, Mirab Azerenet, Enemorena Ener, Yem & Shey Bench/ ET-SNPPR-AGP-36364-CW- RFB / Construction of Jinka, Bonga and Arbaminch ARC SSIP (project name Neri, South Ari Woreda, Alega kebele, 40 Single Stage - One 2018-09- IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 1,584,876.00 674,138.41 Signed 2017-12-20 2018-01-10 2017-12-25 2018-01-24 2018-02-09 2018-02-23 2019-09-02 2018-03-30 2018-03-14 Ha) / (project name Shenba, Envelope 26 Gimbo Woreda, shenba kebele 70 Ha & project name-------- , Arbaminch Zuria Woreda, --- -----kebele, 30 Ha/ ET-SNPPR-AGP-36252-CW- RFB / Rehabilitation of existing modern small scale Single Stage - One 2018-08- irrigation project (project IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 72,202.00 0.00 Canceled 2017-11-22 2017-11-27 2017-12-27 2018-01-26 2018-03-02 Envelope 29 name Bazera, Basketo S/Woreda, Bazerakebele, 60 Ha) ET-SNPPR-AGP-36186-CW- RFB / Construction of New Medium Scale Irrigation Single Stage - One 3,658,673.2 2018-10- Project (project name IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 3,754,512.00 Signed 2017-11-22 2017-11-30 2017-11-27 2017-12-27 2017-12-29 2018-02-25 2019-09-02 2018-04-01 2018-02-02 Envelope 6 28 Megecha-1, Cheha Woreda, Degage/Yesher Kebele, 347 Ha) ET-SNPPR-AGP-36359-CW- RFB / Construction of 3 New Small Scale Irrigation Project (project name Gashume, Esera Woreda,-----------kebele, Single Stage - One 1,462,283.8 2018-07- 70 Ha) (project name Woi, IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 1,812,055.00 Signed 2017-12-06 2017-11-30 2017-12-11 2018-01-10 2017-12-29 2018-02-09 2019-09-02 2018-03-16 2018-01-30 Envelope 8 14 Decha Woreda, Baska Diri Kebele, 85 Ha) (project name Shore, South Bench Woreda, Gedu Botersaytu Adisalem kebele, 93 Ha) ET-SNPPR-AGP-36217-CW- RFB / Single Stage - One 2018-07- Constructing/Establishing of IDA / 56050 Agricultural Research Post Request for Bids Open - National 11,642.00 0.00 Canceled 2017-11-20 2017-11-25 2017-12-25 2018-02-23 2018-03-30 Envelope 28 Queen Rearing and Beekeeping Training Center ET-SNPPR-AGP-36154-CW- Agriculture Marketing and Request for Single Stage - One 2018-09- RFQ / Construction of liquid IDA / 56050 Post Limited 36,100.00 0.00 Canceled 2018-02-05 2018-04-02 Value Chains Quotations Envelope 29 nitogen production house ET-SNPPR-AGP-36236-CW- RFB / Construction of micro dam on 9 woredas /Mirab Single Stage - One 2018-12- Azerenet, Misrak Azerenet, IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 685,920.00 0.00 Canceled 2018-02-09 2018-02-14 2018-03-16 2018-05-15 2018-06-19 Envelope 16 Alicho Wurriro ,Endegagn, Gumer, Geta, Yem, Benethmay & Melekoza ET-SNPPR-AGP-36248-CW- RFQ / Construction of fish pond digging & poultry production house (This construction type is a new Request for Single Stage - One 2018-06- IDA / 56050 Small Scale Irrigation Post Open - National 6,498.00 0.00 Canceled 2018-03-10 2018-05-18 technology. Which is Quotations Envelope 17 constructed jointly together. The drawing and bill of quantity are prepared as together and the same time) ET-SNPPR-AGP-41170-CW- RFB / Construction of New Small Scale Irrigation Project Single Stage - One 2018-10- (project name Quanquaye, IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 821,426.00 576,749.13 Terminated 2017-12-30 2019-09-06 2018-01-04 2018-02-03 2018-02-09 2018-03-20 2019-09-06 2018-04-14 2018-03-06 Envelope 11 Alicho wurriro Woreda, 40 Ha and project name Kecher, Cheha woreda, 70 Ha) ET-SNPPR-AGP-41181-CW- RFB / Construction of New Small Scale Irrigation Project Single Stage - One 2018-10- IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 514,753.00 536,950.76 Completed 2017-12-30 2018-01-10 2018-01-04 2018-02-03 2018-02-09 2018-03-20 2019-09-02 2018-04-14 2018-02-27 (project name Chelechele, Envelope 11 Gedebe Woreda, Banko Chelechel Kebele, 52 Ha) ET-SNPPR-AGP-43742-CW- Agriculture Marketing and Single Stage - One 2018-07- RFB / Construction of liquid IDA / 56050 Post Request for Bids Open - National 36,100.00 0.00 Canceled 2018-01-22 2018-01-27 2018-02-26 2018-03-28 2018-05-02 Value Chains Envelope 31 nitrogen production house Page 1 ET-SNPPR-AGP-58180-CW- RFB / Construction of weger Single Stage - One 2019-01- IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 355,480.00 340,232.35 Signed 2018-04-10 2019-08-05 2018-04-15 2018-05-15 2018-05-15 2018-06-14 2019-08-05 2018-07-19 2018-06-29 SSIP (58 ha, alicho wurriro Envelope 15 woreda) ET-SNPPR-AGP-81123-CW- Single Stage - One 2019-08- RFB / Construction of micro IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 1,071,428.00 456,909.61 Signed 2018-12-03 2018-11-30 2018-12-08 2019-01-07 2019-01-02 2019-01-22 2019-01-15 2019-02-26 2019-02-19 Envelope 25 dam ET-SNPPR-AGP-83554-CW- RFB / Construction of three Single Stage - One 2,366,765.2 2019-10- small scale irrigation project IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 2,635,714.00 Completed 2018-10-22 2018-11-02 2018-10-27 2018-11-26 2018-12-04 2018-12-26 2019-08-26 2019-01-30 2019-01-09 Envelope 9 27 (bita, gewata and gimbo woredas 375 ha) lot one ET-SNPPR-AGP-83555-CW- RFB / Construction of three Single Stage - One 2019-10- small scale irrigation project IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 1,950,000.00 901,479.52 Signed 2018-10-22 2018-11-02 2018-10-27 2018-11-26 2018-12-04 2018-12-26 2019-01-14 2019-01-30 2019-01-16 Envelope 27 (tocha, yeki and north ari woredas 329 ha) lot two ET-SNPPR-AGP-83556-CW- RFB / Construction of two Single Stage - One 2019-10- small scale irrigation project IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 1,021,428.00 474,188.21 Signed 2018-10-22 2018-11-02 2018-10-27 2018-11-26 2018-12-04 2018-12-26 2018-12-14 2019-01-30 2019-01-16 Envelope 27 (geta and gummer woredas 153 ha) lot three ET-SNPPR-AGP-38897-CW- CDD / Construction of Trial bridge /Dawero zone, Tocha Agriculture Marketing and Community Driven 2018-06- Woreda, Gedacheche and IDA / 56050 Prior Direct 41,347.00 0.00 Canceled 2017-12-06 2017-12-29 2017-12-11 2018-01-25 Value Chains Development 24 Gedacheche kebele, bridge name Yechi, span meter 109.38, D-type/ ET-SNPPR-AGP-103638-CW- RFB / Construction of five small scale irrigation project Single Stage - One 2019-12- IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 2,607,142.00 0.00 Canceled 2019-02-27 2019-03-04 2019-04-03 2019-05-03 2019-06-07 /tocha, essera, konta and Envelope 04 basketo woredas 266 ha/ lot one ET-SNPPR-AGP-103182-CW- RFB / Construction of seven small scale irrigation project Single Stage - One 2019-12- IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 3,357,142.00 0.00 Canceled 2019-02-27 2019-03-04 2019-04-03 2019-05-03 2019-06-07 /bursa, gorche, wendogenet, Envelope 04 arbegona, bule and gedeb woredas 425 ha/ lot three ET-SNPPR-AGP-103174-CW- RFB / Construction of Agriculture Marketing and Single Stage - One 2019-12- IDA / 56050 Post Request for Bids Open - National 272,000.00 369,127.77 Signed 2019-02-27 2019-04-25 2019-03-04 2019-04-03 2019-06-24 2019-05-03 2019-08-29 2019-06-07 2019-06-24 warehouse for union Value Chains Envelope 04 /gamogofa zone/ ET-SNPPR-AGP-103642-CW- RFB / Construction of Agriculture Marketing and Single Stage - One 2019-12- IDA / 56050 Post Request for Bids Open - National 272,000.00 335,976.13 Completed 2019-02-27 2019-05-11 2019-03-14 2019-04-13 2019-06-03 2019-05-13 2019-08-29 2019-06-17 2019-07-05 warehouse for union /siltie Value Chains Envelope 14 zone/ ET-SNPPR-AGP-103177-CW- RFB / Construction of Agriculture Marketing and Single Stage - One 2019-12- IDA / 56050 Post Request for Bids Open - National 272,000.00 335,826.13 Signed 2019-02-27 2019-05-21 2019-03-04 2019-04-03 2019-06-28 2019-05-03 2019-08-28 2019-06-07 2019-07-29 warehouse for union /bench Value Chains Envelope 04 maji zone/ ET-SNPPR-AGP-103184-CW- Agricultural Public Support Single Stage - One 2019-12- RFB / Construction of queen IDA / 56050 Post Request for Bids Open - National 357,142.00 298,495.89 Signed 2019-02-27 2019-08-26 2019-03-04 2019-04-03 2019-04-15 2019-05-03 2019-08-26 2019-06-07 2019-06-20 Services Envelope 04 rearing center /keffa zone/ ET-SNNPR-AGP-103646-CW- CDD / Construction of Trial bridge /Dawero zone, Tocha Agricultural Public Support Community Driven 2018-05- Woreda, Gedacheche and IDA / 56050 Post Direct 41,347.00 38,692.56 Completed 2017-12-09 2019-10-09 2017-12-14 2019-10-09 2018-02-02 2017-08-18 Services Development 03 Gedacheche kebele, bridge name Yechi, span meter 109.38, D-type/ ET-SNPPR-AGP-110472-CW- RFQ / Rehabilitation of sala Request for Single Stage - One 2019-09- SSIP /south omo zone north IDA / 56050 Small Scale Irrigation Post Limited 128,725.00 0.00 Canceled 2019-04-21 2019-06-16 Quotations Envelope 14 ari woreda alfaro and shera difty kebele 53 ha/ ET-SNPPR-AGP-111055-CW- RFB / Construction of milk & Agriculture Marketing and Single Stage - One 2020-01- IDA / 56050 Post Request for Bids Open - National 449,999.00 594,070.02 Completed 2019-04-17 2019-08-30 2019-04-22 2019-05-22 2019-05-30 2019-06-06 2019-08-30 2019-07-05 2019-07-05 honey collection and Value Chains Envelope 01 processing center ET-SNNPR-WONDO WO-AGP- 210348-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,720.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sidama Region Wondo Genet Woreda/ ET-SNNPR-MEL-WO-AGP- 210321-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,475.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sidama Region Melga Woreda/ ET-SNNPR-GOR-WO-AGP- 210481-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,480.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sidama Region Gorche Woreda/ Page 2 ET-SNNPR-AGP-ARB-WO- 210318-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,890.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sidama Region Arbegona Woreda/ ET-SNNPR-AGP-SHA-WO- 210316-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,460.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sidama Region Shafamo Woreda/ ET-SNNPR-BUR-WO-AGP- 210339-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,380.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sidama Region Bursa Woreda/ ET-SNNPR-TET-WO-AGP- 210335-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 80,130.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sidama Region Teticha Woreda/ ET-SNNPR-MIR AZ-WO-AGP- 210456-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 81,100.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Siltie Zone Mirab Azernet Woreda/ ET-SNNPR-MIA-WO-AGP- 210314-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,800.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Siltie Zone Misraq Azernet Woreda/ ET-SNNPR-ALI-WO-AGP- 210315-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 78,690.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Siltie Zone Alicho Wuriro Woreda/ ET-SNNPR-ESS-WO-AGP- 210324-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,620.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP/Dawro Zone Essera Woreda/ ET-SNNPR-TOC-WO-AGP- 210482-CW-RFQ / Construction works Pending Request for Single Stage - One 2021-06- forUpgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 78,600.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Dawro Zone Tocha Woreda/ ET-SNNPR-TER ZU-WO-AGP- 210462-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,720.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Dawro Zone Tercha Zuriya Woreda/ ET-SNNPR-KEC-WO-AGP- 210469-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 78,200.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Dawro Zone Kechi Woreda/ ET-SNNPR-DEB ARI-WO-AGP- 210473-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,600.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Debub Omo Zone Debub Ari Woreda/ ET-SNNPR-WUBA-WO-AGP- 210470-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,200.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Debub Omo Zone Wuba Ari Woreda/ ET-SNNPR-BAKA-WO-AGP- 210471-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,900.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Debub Omo Zone Baka Dawla Woreda/ Page 3 ET-SNNPR-SEMEN ARI-AGP- 210496-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 81,800.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Debub Omo Zone Semen Ari Woreda/ ET-SNNPR-BENA-WO-AGP- 210484-CW-RFQ / Construction works for Pending Upgrading and/or Request for Single Stage - One 2021-06- IDA / 56050 Small Scale Irrigation Post Limited 80,800.00 0.00 Implementat 2021-01-01 2021-03-01 Improvement of Quotations Envelope 29 ion ExistingTraditional SSIP /Debub Omo Zone Benatsemay Woreda/ ET-SNNPR-DEC-WO-AGP- 210329-CW-RFQ / Construction works Pending Request for Single Stage - One 2021-06- forUpgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 80,600.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Kaffa Zone Decha Woreda/ ET-SNNPR-GOBA-WO-AGP- 210497-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 80,200.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Keaffa Zone Goba Woreda/ ET-SNNPR-CHEN-WO-AGP- 210483-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,500.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Kaffa Zone Chena Woreda/ ET-SNNPR-SHI-WO-AGP- 210475-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,900.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Kaffa Zone Shisho Ende Woreda/ ET-SNNPR-GIM-WO-AGP- 210341-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,800.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Kaffa Zone Gimbo Woreda/ ET-SNNPR-GEW-WO-AGP- 210479-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,800.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Kaffa Zone Gewata Woreda/ ET-SNNPR-BITA-WO-AGP- 210498-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 81,000.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Kaffa Zone Bita Woreda/ ET-SNNPR-ENE-WO-AGP- 210332-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 80,900.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gurage Zone Enemorna Ener Woreda/ ET-SNNPR-ENOR-WO-AGP- 210499-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 80,700.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gurage Zone Enor Ener Woreda/ ET-SNNPR-END-WO-AGP- 210343-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,500.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gurage Zone Endegagn Woreda/ ET-SNNPR-CH-WO-AGP- 210465-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 77,700.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gurage Zone Cheha Woreda/ ET-SNNPR-GUM-WO-AGP- 210468-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 77,200.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gurage Zone Gumer Woreda/ Page 4 ET-SNNPR-AGP-GETA-WO- 210323-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,800.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gurage Zone Geta Woreda/ ET-SNNPR-BULE-WO-AGP- 210480-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 80,600.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gedeo Zone Bule Woreda/ ET-SNNPR-RAP-WO-AGP- 210477-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 80,100.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gedeo Zone Raphe Woreda/ ET-SNNPR-GED-WO-AGP- 210494-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,200.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gedeo Zone Gedeb Woreda/ ET-SNNPR-CHO-WO-AGP- 210458-CW-RFQ / Construction works for Pending Request for 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post 79,600.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations 29 Improvement of Existing ion Traditional SSIP /Gedeo Zone Chorso Woreda/ ET-SNNPR-DEB BEN-WO-AGP- 210474-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,200.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Bench Sheko Zone Debub Bench Woreda/ ET-SNNPR-SHEY BEN-WO- AGP-210337-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,000.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Bench Sheko Zone Shey Bench Woreda/ ET-SNNPR-SEM BEN-WO-AGP- 210491-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,900.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Bench Sheko Zone Semen Bench Woreda/ ET-SNNPR-GIDI BE-AGP- 210346-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,400.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Bench Sheko Zone Gidi Bench Woreda/ ET-SNNPR-ME-WO-AGP- 210452-CW-RFQ / Construction works for Pending Upgrading and/or Request for Single Stage - One 2021-06- IDA / 56050 Small Scale Irrigation Post Limited 79,800.00 0.00 Implementat 2021-01-01 2021-03-01 Improvement of Existing Quotations Envelope 29 ion Traditional SSIP /Bench Sheko Zone Me'anit Goldiya Bench Woreda/ ET-SNNPR-GAC-WO-AGP- 210478-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 80,000.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Mirab Omo Zone Gachit Woreda/ ET-SNNPR-YEKI-WO-AGP- 210467-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,700.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sheka Zone Yeki Woreda/ ET-SNNPR-AND-WO-AGP- 210472-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,900.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Sheka Zone Andracha Woreda/ ET-SNNPR-MELO-WO-AGP- 210476-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,700.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gofa Zone Melokoza Woreda/ Page 5 ET-SNNPR-MELO GA-WO- AGP-210460-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,300.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Gofa Zone Melo Gada Woreda/ ET-SNNPR-KON-WO-AGP- 210461-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,800.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Konta Special Woreda/ ET-SNNPR-BAS-WO-AGP- 210464-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,600.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Basketo Special Woreda/ ET-SNNPR-YEM-WO-AGP- 210454-CW-RFQ / Construction works for Pending Request for Single Stage - One 2021-06- Upgrading and/or IDA / 56050 Small Scale Irrigation Post Limited 79,700.00 0.00 Implementat 2021-01-01 2021-03-01 Quotations Envelope 29 Improvement of Existing ion Traditional SSIP /Yem Special Woreda/ ET-SNPPR-AGP-2-ICSDDA- 212261-CW-RFQ / Construction of Arbaminch Pending Request for Single Stage - One 2021-08- Agricultural Research Center IDA / 56050 Small Scale Irrigation Post Limited 70,000.00 0.00 Implementat 2021-01-13 2021-03-14 Quotations Envelope 11 for Additional and Remaining ion Works /Gamo Zone Arbaminch Woreda 25 Ha/ ET-SNPPR-AGP-2-ICSDAA- 212255-CW-RFQ / Construction of Quanquaye Request for Single Stage - One 2021-08- IDA / 56050 Small Scale Irrigation Post Limited 156,000.00 0.00 Canceled 2021-01-14 2021-03-15 Small Scale Irrigation Project Quotations Envelope 12 for Remaining Works /Gurage Zone Gumer Woreda 40 Ha/ ET-SNPPR-AGP-2-ICSDAA- 212258-CW-RFB / Construction of Petu Small Pending Single Stage - One 2021-09- Scale Irrigation Project for IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 665,000.00 0.00 Implementat 2021-01-03 2021-01-13 2021-02-12 2021-02-27 2021-03-29 Envelope 25 Remaining Works /Bench ion Sheko Zone Semen Bench Woreda 84 Ha/ ET-SNPPR-AGP-2-ICSDDA- 212260-CW-RFB / Pending Construction of Mojo Small Single Stage - One 2021-09- IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 414,000.00 0.00 Implementat 2021-01-03 2021-01-13 2021-02-12 2021-02-27 2021-03-29 Scale Irrigation Project for Envelope 25 ion Remaining Works /Gofa Zone Melokoza Woreda 60 Ha/ ET-SNPPR-AGP-II-223443- CW-RFB / Construction of canal, drop structure, division box, chute and farm Pending Single Stage - One 2021-10- structures for micro dam. lot IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 314,500.00 0.00 Implementat 2021-04-06 2021-04-21 2021-05-21 2021-06-05 2021-07-05 Envelope 03 1 Dangore project wolayeta ion zone sodo zuriya woreda and lot 2 quanquaye project siltie zone alicho wurriro woreda. ET-SNPPR-AGP-ICSDAA- 218990-CW-RFB / Construction of preparatory works, head work & appurtenant structure, lined Pending Single Stage - One 2021-10- main canal construction, IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 579,000.00 0.00 Implementat 2021-04-06 2021-04-21 2021-05-21 2021-06-05 2021-07-05 Envelope 03 secondary canal structures, ion tertiary canals and social structures for Shoteyo SSIP /Kaffa Zone Gewata Woreda 120 Ha/. ET-SNNPR-AGP-2-ICSDAA- 234756-CW-RFB / Construction of civil access Request for Bids - Pending road, head work, pump Single Stage - One Small Works SPD 2021-11- IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 145,000.00 0.00 Implementat 2021-05-28 2021-06-07 2021-07-07 2021-07-22 2021-08-21 house, structures on canals Envelope (1 envelope 19 ion and social service structures process) for quanquaye SSIP guragie zone gumer woreda. ET-SNNPR-AGP-2-ICSDAA- 237029-CW-RFB / Construction of canal and Request for Bids - elevated flume structures and Pending Single Stage - One Small Works SPD 2021-11- connecting the main canal IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 232,600.00 0.00 Implementat 2021-05-28 2021-06-07 2021-07-07 2021-07-22 2021-08-21 Envelope (1 envelope 19 having about 3350 meters ion process) length for kecher SSIP /gurage zone cheha woreda 90 hectar/. ET-SR-AGP-2-237032-CW- RFB / Construction of main Request for Bids - canal, secondary canal, Pending Single Stage - One Small Works SPD 2021-12- manholes and two elevated IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 418,600.00 0.00 Implementat 2021-05-28 2021-06-07 2021-07-07 2021-07-22 2021-08-21 Envelope (1 envelope 19 pipe flume for morodo SSIP ion process) /sidama region bursa woreda 100 hectar/ GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 6 ET-SNPPR-AGP-36373-GO- RFQ / Purchase of garden Agricultural Public Support Request for Single Stage - One equipments /Prunning IDA / 56050 Post Limited 39,710.00 32,703.79 Completed 2018-01-20 2019-10-10 2018-03-17 2018-02-03 2018-05-16 2018-02-07 Services Quotations Envelope scissor, Saw & rope washer pump/ ET-SNPPR-AGP-36183-GO- RFQ / Purchase of office Project Management, Request for Single Stage - One equipments /IT equipments/ IDA / 56050 Capacity Building and Post Limited 24,072.00 0.00 Canceled 2017-12-16 2018-02-14 2018-04-15 Quotations Envelope laptop computer, Desktop Monitoring and Evaluation computer, Printer & EHD ET-SNPPR-AGP-36320-GO- Project Management, Request for Single Stage - One RFQ / Procurement of office IDA / 56050 Capacity Building and Post Limited 1,444.00 0.00 Canceled 2017-12-16 2018-01-19 2018-02-18 Quotations Envelope furniture /Chair & Table/ Monitoring and Evaluation ET-SNPPR-AGP-36367-GO- RFQ / Purchase of stationary Agricultural Public Support Request for Single Stage - One and office supplies /Saftey IDA / 56050 Post Limited 21,408.00 1,645.80 Signed 2017-12-25 2019-10-10 2018-02-22 2019-07-05 2018-03-24 2018-07-06 Services Quotations Envelope shoe, Rain coat & Sleeping bag/ ET-SNPPR-AGP-36230-GO- Agricultural Public Support Request for Single Stage - One RFQ / Provision of kitchen IDA / 56050 Post Limited 12,636.00 0.00 Canceled 2018-01-03 2018-03-03 2018-04-02 Services Quotations Envelope equipments ET-SNPPR-AGP-36147-GO- Agricultural Public Support Request for Single Stage - One RFQ / Purchase of day old IDA / 56050 Post Limited 1,444.00 0.00 Canceled 2018-03-10 2018-05-01 2018-05-31 Services Quotations Envelope chicken/layers ET-SNPPR-AGP-36385-GO- RFB / Purchase of laboratory equipments /soil testing, seed Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 608,444.00 1,199,574.43 Completed 2017-12-04 2019-08-25 2017-12-09 2018-01-08 2018-01-09 2018-02-22 2019-10-08 2018-03-29 2018-05-17 2018-07-27 2019-05-16 quality analysis, agricultural Services Envelope input testing and soil tesing laboratory equipments/ ET-SNPPR-AGP-36177-GO- RFQ / Procurement of wireless Project Management, information sharing and Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 25,270.00 0.00 Canceled 2017-12-16 2018-02-10 2018-04-11 control technology system Quotations Envelope Monitoring and Evaluation /Server & Window server (server operating system) ET-SNPPR-AGP-36374-GO- RFQ / Procurement of Request for Single Stage - One surveying equipments /Total IDA / 56050 Small Scale Irrigation Post Limited 36,101.00 0.00 Canceled 2018-01-09 2018-03-06 2018-04-05 Quotations Envelope station, Level instrument and GPS ET-SNPPR-AGP-36386-GO- RFQ / Provision of laboratory Agricultural Public Support Request for Single Stage - One equipments /forage seed IDA / 56050 Post Open - National 43,320.00 24,914.14 Completed 2017-12-09 2018-02-13 2018-02-22 2018-04-14 2018-07-02 Services Quotations Envelope multiplication center and animal health/ ET-SNPPR-AGP-36166-GO- Agricultural Public Support Request for Single Stage - One RFQ / Purchase of sexed IDA / 56050 Post Limited 41,516.00 0.00 Canceled 2017-12-02 2018-01-27 2018-02-26 Services Quotations Envelope semen ET-SNPPR-AGP-36382-GO- RFB / Procurement of animal feed processing equipments Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 86,642.00 0.00 Canceled 2018-03-15 2018-03-20 2018-04-19 2018-05-19 2018-06-23 2018-06-27 /feed processing machine & Services Envelope Urea Molases Block (UMB) machine/ ET-SNPPR-AGP-36198-GO- Agricultural Public Support Request for Single Stage - One RFQ / Provision of printing IDA / 56050 Post Open - National 12,635.00 0.00 Canceled 2018-04-07 2018-06-15 2018-07-15 Services Quotations Envelope and publication ET-SNPPR-AGP-36118-GO- RFB / Procurement of vehicles Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 505,415.00 0.00 Canceled 2017-11-20 2017-11-25 2017-12-25 2018-01-24 2018-02-28 2018-06-28 /Dump Truck, Scavator & Services Envelope Station wagon long base/ ET-SNPPR-AGP-36317-GO- DIR / Procurement of Improved agricultural inputs Under Agricultural Public Support for demonestration tecnology IDA / 56050 Post Direct Selection Direct 18,628.00 0.00 Implementati 2018-01-22 2019-10-11 2018-01-27 2019-10-11 2018-03-02 2018-04-11 Services on FTC /Blended fertilizer, Bio on fertilizer, Urea Potassium, Sachet & Vermi worm/ ET-SNPPR-AGP-44465-GO- Agricultural Public Support Single Stage - One RFB / Purchase of sexed IDA / 56050 Post Request for Bids Open - National 41,516.00 0.00 Canceled 2018-02-09 2018-02-19 2018-03-21 2018-04-20 2018-05-14 2018-08-12 Services Envelope semen ET-SNPPR-AGP-44468-GO- RFB / Procurement of wireless Project Management, information sharing and Single Stage - One IDA / 56050 Capacity Building and Post Request for Bids Open - National 25,270.00 0.00 Canceled 2018-02-28 2018-03-10 2018-04-09 2018-05-09 2018-06-02 2018-09-30 control technology system Envelope Monitoring and Evaluation /Server & server operating system/ ET-SNPPR-AGP-44469-GO- RFB / Purchase of office Project Management, Single Stage - One equipments /IT equipments/ IDA / 56050 Capacity Building and Post Request for Bids Open - National 39,700.00 38,056.24 Completed 2018-01-31 2019-08-31 2018-02-10 2018-03-12 2018-09-25 2018-04-11 2019-08-31 2018-05-05 2018-12-19 2018-08-03 2019-01-22 Envelope laptop computer, Desktop Monitoring and Evaluation computer, Printer & EHD......../ ET-SNPPR-AGP-44472-GO- Agricultural Public Support Single Stage - One RFB / Provision of kitchen IDA / 56050 Post Request for Bids Open - National 16,245.00 0.00 Canceled 2018-01-31 2018-02-10 2018-03-12 2018-04-11 2018-05-05 2018-07-04 Services Envelope equipments ET-SNPPR-AGP-44476-GO- Project Management, RFB / Procurement of office Single Stage - One IDA / 56050 Capacity Building and Post Request for Bids Open - National 5,415.00 0.00 Canceled 2018-01-31 2018-02-10 2018-03-12 2018-04-11 2018-05-05 2018-07-04 furniture /Chair, Table, Envelope Monitoring and Evaluation Shelf..../ Page 7 ET-SNPPR-AGP-44480-GO- Agricultural Public Support Single Stage - One RFB / Procurement of day old IDA / 56050 Post Request for Bids Open - National 1,444.00 0.00 Canceled 2018-02-09 2018-02-19 2018-03-21 2018-04-20 2018-05-14 2018-07-13 Services Envelope chicken/layers ET-SNPPR-AGP-44482-GO- RFB / Procurement of Single Stage - One surveying equipments /Total IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 36,101.00 0.00 Canceled 2018-02-28 2018-03-10 2018-04-09 2018-05-09 2018-06-02 2018-08-31 Envelope station, Level instrument & GPS/ ET-SNPPR-AGP-50503-GO- Agricultural Public Support Request for Single Stage - One RFQ / Purchase of auditorium IDA / 56050 Post Limited 21,660.00 33,037.78 Completed 2018-02-23 2019-08-31 2018-03-03 2018-02-22 2018-03-23 2018-09-06 Services Quotations Envelope seats/chairs/ ET-SNNPR-AGP-56692-GO- Agricultural Public Support Single Stage - One RFB / Purchase of rope and IDA / 56050 Post Request for Bids Open - National 12,635.00 9,418.21 Completed 2018-04-10 2019-08-30 2018-04-15 2018-05-15 2018-05-14 2018-05-25 2019-08-30 2018-06-23 2018-08-30 2018-08-07 2019-02-01 Services Envelope washer pump ET-SNPPR-AGP-79198-GO- Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 98,364.00 47,110.95 Signed 2018-06-10 2018-12-25 2018-06-15 2018-07-15 2019-01-23 2018-07-25 2019-01-25 2018-08-23 2019-02-26 2018-11-21 RFB / Procurement of lime Services Envelope ET-SNPPR-AGP-81227-GO- Single Stage - One RFB / Procurement of motor IDA / 56050 Small Scale Irrigation Post Request for Bids Open - National 642,857.00 564,780.68 Completed 2018-10-17 2019-03-29 2018-10-22 2018-11-21 2019-04-29 2018-12-11 2019-04-29 2019-01-10 2019-06-05 2019-05-10 2019-06-18 Envelope cycle ET-SNPPR-AGP-93861-GO- RFB / Procurement of liquid Agriculture Marketing and Single Stage - One IDA / 56050 Post Request for Bids Open - National 42,857.00 0.00 Canceled 2019-01-16 2019-01-21 2019-02-20 2019-03-07 2019-04-06 2019-07-05 nitrogen container & deep Value Chains Envelope freeze ET-SNPPR-AGP-82441-GO- Agricultural Public Support Single Stage - One RFB / Purchase of bow saw, IDA / 56050 Post Request for Bids Open - National 37,500.00 11,032.80 Completed 2018-10-22 2018-10-23 2018-10-27 2018-11-26 2018-11-22 2018-12-11 2018-12-06 2019-01-10 2019-01-11 2019-02-19 2019-01-16 Services Envelope bow saw blade and scissor ET-SNPPR-AGP-95591-GO- Under RFB / Procurement of earth Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 535,714.00 0.00 Implementati 2019-01-19 2019-02-04 2019-01-24 2019-02-23 2019-03-06 2019-03-25 2019-03-25 2019-04-23 2019-08-21 moving equipment /excavator Services Envelope on and dump truck/ ET-SNPPR-AGP-95593-GO- RFB / Procurement of vehicles Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 500,000.00 0.00 Canceled 2019-01-19 2019-01-24 2019-02-23 2019-03-25 2019-04-24 2019-08-22 /pick up and long base nine Services Envelope seat/ ET-SNPPR-AGP-95595-GO- Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 25,714.00 24,948.89 Completed 2019-01-24 2019-02-15 2019-02-27 2019-03-20 2019-03-29 2019-05-15 RFQ / Procurement of scissor Services Quotations Envelope ET-SNPPR-AGP-95596-GO- Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 285,714.00 299,423.52 Signed 2019-01-19 2019-02-04 2019-01-24 2019-02-23 2019-03-05 2019-03-10 2019-04-03 2019-04-09 2019-05-07 2019-07-08 RFB / Procurement of lime Services Envelope ET-SNPPR-AGP-98547-GO- DIR / Procurement of improved agricultural inputs Under /basic, pre basic and certified Agricultural Public Support IDA / 56050 Post Direct Selection Direct 14,027.00 0.00 Implementati 2019-02-03 2019-10-11 2019-02-13 2019-10-11 2019-03-10 2019-04-09 seeds/ for demonestration on Services on FTC /fertlizer, maize, haricobean, wheat, barley, teff, soya bean, vermi worm/ ET-SNPPR-AGP-36142-GO- DIR / Purchase of Improved Agricultural Public Support IDA / 56050 Prior Direct Selection Direct 171,749.00 0.00 Canceled 2017-11-20 2017-12-07 2017-11-25 2018-03-20 2018-01-09 2018-02-08 agricultural technologies /Tie- Services Reger & Aybar BBM/ ET-SNPPR-AGP-36394-GO- DIR / Purchase of basic Improved seed and agricultural inputs for demonestration tecnology on Agricultural Public Support FTC (Hibred parental line IDA / 56050 Prior Direct Selection Direct 265,187.00 0.00 Canceled 2018-02-12 2018-02-17 2018-04-03 2018-07-02 Services seed, Haricot bean, Forage seed & Malt barley)Protein maize, Faba bean, Haircot bean, Cheack pea, Avocado, Improved coffee seed/ ET-SNPPR-AGP-103172-GO- Project Management, RFQ / Procurement of tablet Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 7,142.00 8,708.06 Completed 2019-03-04 2019-05-24 2019-04-08 2019-06-24 2019-05-08 2019-07-03 computer for upgrading IT Quotations Envelope Monitoring and Evaluation and net work system Project Management, Under ET-SNPPR-AGP-103178-GO- Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 3,571.00 752.55 Implementati 2019-03-04 2019-10-09 2019-04-15 2019-05-15 RFQ / Purhase of safety shoe Quotations Envelope Monitoring and Evaluation on ET-SNNPR-AGP-36142-GO- DIR / Purchase of Improved Agricultural Public Support IDA / 56050 Post Direct Selection Direct 171,749.00 138,194.24 Completed 2017-12-07 2019-10-09 2017-12-22 2019-10-09 2018-01-26 2018-01-29 2018-07-25 2018-02-08 agricultural technologies /Tie- Services Reger & Aybar BBM/ ET-SNNPR-AGP-36394-GO- DIR / Purchase of basic Improved seed and agricultural inputs for demonestration tecnology on Agricultural Public Support FTC (Hibred parental line IDA / 56050 Post Direct Selection Direct 265,187.00 180,293.46 Signed 2018-02-12 2019-10-11 2018-02-17 2019-10-11 2018-03-24 2018-07-03 2018-05-23 2018-07-03 Services seed, Haricot bean, Forage seed & Malt barley)Protein maize, Faba bean, Haircot bean, Cheack pea, Avocado, Improved coffee seed/ ET-SNPPR-AGP-108166-GO- DIR / Procurement of soil Agricultural Public Support fertility management IDA / 56050 Post Direct Selection Direct 55,000.00 53,348.61 Completed 2019-03-28 2019-04-24 2019-04-07 2019-05-21 2019-05-11 2019-06-24 2019-06-10 2019-06-26 Services technologies /tie ridger and berken maresha/ ET-SNPPR-AGP-110483-GO- RFQ / Provision of improved Agriculture Marketing and Request for Single Stage - One IDA / 56050 Post Limited 22,961.00 12,726.35 Completed 2019-04-19 2019-10-09 2019-06-07 2019-05-09 2019-08-06 2019-05-16 basic forage, forage seeds for Value Chains Quotations Envelope poultry and fish development Page 8 ET-SNPPR-AGP-111054-GO- RFQ / Purchase of fishery materials and equipments Agriculture Marketing and Request for Single Stage - One /fishing gill net, beach seine IDA / 56050 Post Limited 27,000.00 7,493.33 Completed 2019-04-23 2020-10-14 2019-06-05 2020-04-08 2019-08-04 2020-05-25 Value Chains Quotations Envelope net, wooden fishing boat, life saving jacket, geo memberane.../ ET-SNPPR-AGP-111053-GO- RFB / Procurement of materials /equipments/ for milk and honey collection & processing center /aluminummilk cane, churner, Agriculture Marketing and Single Stage - One IDA / 56050 Post Request for Bids Open - National 131,000.00 44,497.74 Completed 2019-04-19 2019-04-29 2019-04-24 2019-05-24 2019-05-29 2019-06-08 2019-10-08 2019-07-07 2019-07-03 2019-10-05 2019-07-09 cram separator, weighing Value Chains Envelope balance, lactometer, container for cheese making, butter knife..., honey tank, packaging material, honey sive... ET-SNPPR-AGP-113983-GO- RFQ / Procurement bovans breed /day old chickens/ and Pending koek koek or sasso breed Agriculture Marketing and Request for Single Stage - One IDA / 56050 Post Limited 69,000.00 0.00 Implementati 2019-05-12 2019-06-23 2019-07-23 /day old chickens/, grawer Value Chains Quotations Envelope on chicken ration and layers chicken ration, day old chicks feederer and day old waterer ET-SNPPR-AGP-113992-GO- RFQ / Purchase of 100 watt Agriculture Marketing and Request for Single Stage - One IDA / 56050 Post Limited 2,300.00 1,439.51 Completed 2019-05-12 2020-09-30 2019-06-24 2020-04-07 2019-07-04 2020-05-19 light, light cover and electric Value Chains Quotations Envelope wire 1.5 mm tickness ET-SNPPR-AGP-113993-GO- Pending RFQ / Provision office Agriculture Marketing and Request for Single Stage - One IDA / 56050 Post Limited 10,000.00 0.00 Implementati 2019-05-12 2019-06-24 2019-07-24 furniture for milk collection Value Chains Quotations Envelope on and processing center ET-SNPPR-AGP-113982-GO- RFQ / Purchase of 42 Agriculture Marketing and Request for Single Stage - One Improved rams sheep & 420 IDA / 56050 Post Limited 42,000.00 0.00 Canceled 2019-05-12 2019-07-09 2019-08-08 Value Chains Quotations Envelope local ewes sheep and 88 Improved bucks goat ET-SNPPR-AGP-113980-GO- Under Agriculture Marketing and Request for Single Stage - One RFQ / Provision of 10 liquid IDA / 56050 Post Limited 43,000.00 11,824.32 Implementati 2019-05-12 2019-10-09 2019-06-23 2019-07-23 Value Chains Quotations Envelope nitrogen container 35 litre on ET-SNPPR-AGP-118275-GO- RFB / Procurement of vehicles Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Limited 430,000.00 394,760.80 Completed 2019-06-06 2019-05-07 2019-06-11 2019-05-07 2019-06-18 2019-05-17 2019-06-25 2019-05-17 2019-07-12 2019-06-14 2019-07-27 2019-06-17 /three station wagon and one Services Envelope double cabin pickup/ ET-SNNPR-AGP-147332-GO- RFQ / Purchase of office Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 14,700.00 12,875.44 Completed 2019-12-16 2020-10-14 2020-01-19 2020-01-21 2020-02-18 2020-01-28 furniture /chair 42, table 28 & Services Quotations Envelope shelf 14/ ET-SNNPR-AGP-147338-GO- RFQ / Provision of IT equipment /30 lap top Agricultural Public Support Request for Single Stage - One computer, 30 desk top IDA / 56050 Post Limited 45,400.00 58,149.68 Completed 2019-12-14 2020-10-02 2020-01-17 2020-01-21 2020-03-17 2020-02-05 Services Quotations Envelope computer, 30 printer, 1 color printer, 1 LCD projector, 1 digital photo camera/ ET-SNNPR-AGP-147335-GO- RFQ / Procurement of garden Agricultural Public Support Request for Single Stage - One equipment /1442 scissors , IDA / 56050 Post Limited 28,400.00 6,724.03 Completed 2019-12-14 2020-09-28 2020-01-17 2019-12-27 2020-03-17 2020-01-28 Services Quotations Envelope 1442 bow saw and 1442 bow saw blade/ ET-SNPPR-AGP-152643-GO- Under RFQ / Provision of grower and Agriculture Marketing and Request for Single Stage - One IDA / 56050 Post Limited 17,400.00 2,165.45 Implementati 2020-01-18 2020-10-14 2020-02-22 2020-03-23 layers concentrate feed 400 Value Chains Quotations Envelope on qunital ET-SNPPR-AGP-152642-GO- RFQ / Purchase of day old Agriculture Marketing and Request for Single Stage - One IDA / 56050 Post Limited 2,500.00 7,296.24 Completed 2020-01-18 2020-10-01 2020-02-22 2020-06-04 2020-03-23 2020-06-05 chicks feederer and waterer Value Chains Quotations Envelope 1600 quantity ET-SNNPR-AGP-152641-GO- DIR / Procurement of day old Under Agriculture Marketing and chicks bovans brown 3600 IDA / 56050 Post Direct Selection Direct 26,200.00 21,286.78 Implementati 2020-03-08 2020-09-28 2020-03-18 2020-09-30 2020-04-07 2020-05-07 Value Chains quantity, and day old chicks on kock kock 10752 quantity ET-SNPPR-AGP-167026-GO- Agricultural Public Support Request for Single Stage - One RFQ / Procurement of 125 cc IDA / 56050 Post Limited 60,000.00 57,476.82 Completed 2020-04-07 2020-10-01 2020-05-18 2020-06-25 2020-06-17 2020-06-30 Services Quotations Envelope motor cycle 28 quantity ET-SNPPR-AGP-171016-GO- RFQ / Procurement of sanitary materials /Protective materials/ for Development Agricultural Public Support Request for Single Stage - One Agents /DA's/ emergency IDA / 56050 Post Limited 18,000.00 22,249.68 Completed 2020-05-05 2020-10-12 2020-06-07 2020-05-21 2020-06-22 2020-05-22 Services Quotations Envelope case /1622 liter sanitizer, 3244 face masks, 1622 liter liquid soap and 1622 hand gloves/ ET-SNPPR-AGP-173957-GO- DIR / Purchase of different types of Improved early generation seeds /basic and Agricultural Public Support IDA / 56050 Post Direct Selection Direct 73,000.00 28,043.84 Completed 2020-05-16 2020-09-26 2020-05-26 2020-09-28 2020-06-12 2020-07-02 2020-06-27 2020-07-06 pre basic seed/ for certified Services seed production /Haricot Bean 20 qt, Barley 109 qt and Wheat 857.50 qt/ Page 9 ET-SNPPR-AGP-208261-GO- RFB / Procurement of different types of equipment for queen rearing & training center lot 1, Pending Procurement of equipment for Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 121,300.00 0.00 Implementati 2020-12-06 2020-12-21 2021-01-20 2021-02-04 2021-03-05 2021-07-03 milk collection and processing Services Envelope on center lot 2 and Procurement of equipment for honey collection and processing center lot 3 ET-SNPPR-AGP-208263-GO- RFQ / Procurement of guest Pending house facilities for queen Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 3,750.00 0.00 Implementati 2020-12-21 2021-02-03 2021-03-05 rearing & training center Services Quotations Envelope on /mattress 50, pillow 50, blanket 50, bed sheet 50/ ET-SNPPR-AGP-208275-GO- RFQ / Provision of laboratory equipment for queen rearing Pending Agricultural Public Support Request for Single Stage - One & training center /microscope IDA / 56050 Post Limited 4,540.00 0.00 Implementati 2020-12-21 2021-01-28 2021-04-28 Services Quotations Envelope 1, incubator 1, thermometer on 3, water bath 2, hygrometer 3, ....../ ET-SNPPR-AGP-208264-GO- RFQ / Procurement of office furniture for queen rearing & Pending Agricultural Public Support Request for Single Stage - One training center and honey IDA / 56050 Post Limited 10,400.00 0.00 Implementati 2020-12-21 2021-01-29 2021-02-28 Services Quotations Envelope collection and processing on center /chair 123, table 68 and shelf 15/ ET-SNPPR-AGP-208271-GO- RFQ / Purchase of IT- equipments for queen rearing Pending & training center and honey Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 7,430.00 0.00 Implementati 2020-12-21 2021-02-02 2021-04-03 collection and processing Services Quotations Envelope on center /desktop computer 4, ups 4, printer 4, LCD projector 1, digital camera 1/ ET-SNPPR-AGP-208266-GO- RFQ / Provision of generator Pending Agricultural Public Support Request for Single Stage - One for milk and honey collection IDA / 56050 Post Limited 16,700.00 0.00 Implementati 2020-12-21 2021-02-06 2021-05-07 Services Quotations Envelope and processing center on /quantity 7/ ET-SNPPR-AGP-208268-GO- RFQ / Purchase of safety cloth Pending for milk and honey collection Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 6,700.00 0.00 Implementati 2020-12-21 2021-02-02 2021-04-03 and processing center /tuta Services Quotations Envelope on 215, gloves 180, boots 215, gawn 35 and hair nets 35/ ET-SNPPR-AGP-208270-GO- RFQ / Provision of notice board /6/ and building Pending Agricultural Public Support Request for Single Stage - One notification /24/ for queen IDA / 56050 Post Limited 3,950.00 0.00 Implementati 2020-12-21 2021-02-02 2021-03-04 Services Quotations Envelope rearing & training center and on honey collection and processing center ET-SNPPR-AGP-208272-GO- RFQ / Procurement of window Pending curtain /161 meter/ for queen Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 3,410.00 0.00 Implementati 2020-12-21 2021-01-29 2021-02-28 rearing & training center and Services Quotations Envelope on honey collection and processing center ET-SNPPR-AGP-208273-GO- Pending RFQ / Procurement of angle Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 3,850.00 0.00 Implementati 2020-12-21 2021-02-02 2021-03-04 iron bed for queen rearing Services Quotations Envelope on and training center /quantity 50/ ET-SNPPR-AGP-218987-GO- RFQ / Procurement of scion (# Pending Agricultural Public Support Request for Single Stage - One 64590), Avocado Mother Tree IDA / 56050 Post Limited 29,000.00 0.00 Implementati 2021-02-26 2021-03-24 2021-05-23 Services Quotations Envelope (# 1500) and Avocado Seed on (600 kt) for fruit nursery ET-SNPPR-AGP-218985-GO- RFQ / Provision of Farm Tools & equipments (# 75 wheel barrow, # 150 water can, # Pending 150 grafting scissor, # 150 Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 14,000.00 0.00 Implementati 2021-02-26 2021-03-24 2021-05-23 grafting knife, # 30 knapsack Services Quotations Envelope on sprayer, # 51 saw, # 75 zabiya, # 75 shovel, # 72 gesso, # 75 pick, # 75 rake, # 75 pole) for fruit nursery ET-SNPPR-AGP-218988-GO- Pending Agricultural Public Support Request for Single Stage - One RFQ / Purchase of Polytene IDA / 56050 Post Limited 9,600.00 0.00 Implementati 2021-02-26 2021-03-24 2021-05-23 Services Quotations Envelope Bag (1500 kg) for fruit nursery on ET-SNNPR-AGP-2-237145- GO-DIR / Procurement of Pending improved 250 quintal wheat Agricultural Public Support IDA / 56050 Post Direct Selection Direct 25,600.00 0.00 Implementati 2021-05-31 2021-06-10 2021-06-27 2021-07-12 and 150 quintal barley seed Services on for agricultural cluster demonstration. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-SNPPR-AGP-95597-NC- Agricultural Public Support Single Stage - One RFB / Procurement of lime IDA / 56050 Post Request for Bids Open - National 134,957.00 86,387.86 Signed 2019-01-19 2019-10-09 2019-01-29 2019-02-28 2019-04-29 2019-03-30 2019-10-09 2019-04-29 2019-07-07 2019-06-28 Services Envelope transport service Page 10 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-SNPPR-AGP-44303-CS- QCBS / Site identification, Feasibility Study & Design of Quality And Cost- IDA / 56050 Small Scale Irrigation Post Open - National 162,456.00 0.00 Canceled 2018-01-31 2018-02-15 2018-03-31 2018-04-30 2018-05-30 2018-06-27 2018-07-21 2018-11-18 SSIP (Geta, Endegagn, Gumer, Based Selection Cheha, Enemorena Ener and Yem Woredas) ET-SNPPR-AGP-44320-CS- QCBS / Site identification, Quality And Cost- Feasibility Study & Design of IDA / 56050 Small Scale Irrigation Post Open - National 135,380.00 0.00 Canceled 2018-01-31 2018-02-15 2018-03-31 2018-04-30 2018-05-30 2018-06-27 2018-07-21 2018-11-18 Based Selection SSIP (Gewata, Gimbo, Decha, Chena and Bita Woredas) ET-SNPPR-AGP-44334-CS- QCBS / Site identification, Feasibility Study & Design of Quality And Cost- IDA / 56050 Small Scale Irrigation Post Open - National 162,456.00 0.00 Canceled 2018-01-31 2018-02-15 2018-03-31 2018-04-30 2018-05-30 2018-06-27 2018-07-21 2018-11-18 SSIP (Anderacha, Yeki, South Based Selection Bench, Shey Bench, Menitgoldia and North Bench) ET-SNPPR-AGP-44355-CS- QCBS / Site identification, Feasibility Study & Design of Quality And Cost- Under IDA / 56050 Small Scale Irrigation Post Open - National 189,532.00 0.00 2018-01-31 2019-08-31 2018-02-15 2018-03-31 2018-04-30 2018-05-30 2018-06-27 2018-07-21 2018-11-18 SSIP (Arbegona, Gorche, Based Selection Implementation Malga, Bursa, WondoGenet, Bule and Gedeb Woredas) ET-SNPPR-AGP-44358-CS- QCBS / Site identification, Quality And Cost- Under Feasibility Study & Design of IDA / 56050 Small Scale Irrigation Post Open - National 81,228.00 0.00 2018-01-31 2019-08-31 2018-02-15 2018-03-31 2018-04-30 2018-05-30 2018-06-27 2018-07-21 2018-10-19 Based Selection Implementation SSIP (Alichoworiro, West Azerenet and East Azerenet) ET-SNPPR-AGP-44385-CS- QCBS / Site identification, Feasibility Study & Design of Quality And Cost- IDA / 56050 Small Scale Irrigation Post Open - National 135,380.00 0.00 Canceled 2018-01-31 2018-02-15 2018-03-31 2018-04-30 2018-05-30 2018-06-27 2018-07-21 2018-11-18 SSIP (South Ari, North Ari, Based Selection Benatsemay, Melekoza and Basketo Woredas) ET-SNPPR-AGP-44386-CS- QCBS / Site identification, Quality And Cost- Under Feasibility Study & Design of IDA / 56050 Small Scale Irrigation Post Open - National 81,228.00 0.00 2018-01-31 2018-02-15 2018-03-31 2018-04-30 2018-05-30 2018-06-27 2018-07-21 2018-10-19 Based Selection Implementation SSIP (Tocha, Essera and Konta Woreda) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 11 PLAN DE PASSATION SIMPLIFIE Plan de passation des marchés – PART BAILLEUR (Février 2018) Le présent plan de passation de marchés initial couvre les dix-huit (18) premiers mois du Projet d’Infrastructure pour le Développent Urbain et la Compétitivité des Agglomérations économiques Secondaires (PUDICAS) I. Généralités 1.1. Information générale sur le projet Pays: République de Côte d’Ivoire Emprunteur : Gouvernement de Côte d’Ivoire; Nom du Projet : Projet d’Infrastructure pour le Développent Urbain et la Compétitivité des Agglomérations économiques Secondaires (PUDICAS) Numéros du crédit : xxxxxx Montant du crédit : 120 millions $ US Financement Unité de Gestion: Cellule de Coordination du PRICI 1.2 Date d’approbation du plan de passation de marchés Plan original : Avril 2017 Révision 1 : Novembre 2017 Révision 2 : Mars 2018 1.3 Date de publication de l’avis général de passation de marchés : xxxxxxxxxxxxxxx 1.4 Période couverte par le Plan de passation des marchés : de Mars 2017 à Septembre 2018 II. Fourniture, Travaux et Services Assimilés 2.1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions de l'Annexe 1 des Directives de passation de marchés de janvier 2011, révisé en juillet 2014 : Nouveaux seuils de revue de la Banque élaborés en décembre 2012 et proposés au Gouvernement le 05 décembre 2012, révisés en juillet 2016 et liés au niveau de risque du projet. Nature des dépenses Méthode de passation de Valeur seuil du Contrats soumis à examen marchés marché $EU préalable de l’IDA 1. Travaux AOI ≥ 10,000,000 AON < 10,000,000 Tous les contrats de 15.000.000 (y compris clés en main, $EU et plus Fourniture et montage Demande de cotation – < 200,000 d’installations et PPP) au moins 3 offres Entente Directe (*) Pas de seuil Contrats ≥ 100,000 2. Fournitures, Systèmes AOI ≥ 1,000,000 d’Informations et Services autres que les AON < 1,000,000 Tous les contrats de 4.000.000 services de Consultants $EU et plus Consultation de Fournisseurs à l’échelle Nationale - Au moins 3 < 100,000 offres Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ Consultation de Fournisseurs à l’échelle Nationale - Au moins 3 < 500 000 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil Contrats ≥ 100,000 (*) Le justificatif de toute entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ Type de marchés : Travaux - Fournitures et Prestations de services non intellectuelles Préférenc e Exam. Ouvert Méthod P-Q fournisse par ure plis Coût e urs Banque prévue estimé passati Liste des ensembles de marchés locaux Commentaire en millier on A $EU Marché CODE priori/A Date s Oui/Non Oui/Non STEP posterio prévue Description ri Composante A : Renforcement des infrastructures A économiques des 60 954 agglomérations de Bouaké et San-Pedro Sous-composante A1. Renforcement des A.1 35 436 infrastructures économique de Bouaké 1 lot y compris les couts 01TPU0 Travaux d’aménagement de la estimatifs de 28 418 AOI NON NON A PRIORI 15/04/18 1 traversée de Bouaké (A3) (1 lot) l’Eclairage Publics et de l’aménagemen t paysager 1 lot y compris les couts Aménagement de la voie de 02TPU0 A estimatifs de Tolakouadiokro jusqu’au dépôt de 7 018 AON NON NON 15/01/18 1 posteriori l’Eclairage GESTOCI (T03) (1 lot) Publics et de l’aménagemen t paysager Sous-composante A2. Renforcement des A.2 23 518 infrastructures économiques et touristiques de San-Pedro Un lot comportant 3 Travaux de renforcement de la rue sous lots y des grumiers et voie d’accès urbain compris les 03TPU0 au port aménagement voies de 15/01/18 couts 23 518 AOI NON NON A PRIORI 1 desserte de l’aéroport, et de la zone estimatifs de touristique balnéaire (en 1 lot de 3 l’Eclairage sous lots)) Publics et de l’aménagemen t paysager Composante B : Soutien au B développement du secteur privé 0 à Bouaké et San-Pedro Sous-composante B1. Soutien au B.1 développement du secteur privé 0 à San-Pedro Sous-composante B2. B.2 Renforcement institutionnel Composante C : Amélioration de l’institution, Cadre C Règlementaire et Gestion Urbain 6 421 des Villes de Bouaké et San- Pedro Sous-composante C1. Amélioration de la fonctionnalité C.1 urbanistique et du cadre de vie 6 421 des villes de Bouaké et San- Pedro 07TPU0 Travaux d’aménagement paysager A 22/02/18 828 AON NON NON 3 et jardins publics (01lot) BOUAKE posteriori Plan de passation des marchés simplifié Mars 2018 – ‘Cellule Marché PUDICAS’ 08TPU0 Travaux d’aménagement paysager A 22/03/18 828 AON NON NON 3 et jardins publics (01 lot) SAN PEDRO posteriori 09TPU0 Travaux d’adressage des rues des A 08/03/18 350 AON NON NON 3 villes de Bouaké (01 lot) posteriori 10TPU0 Travaux d’adressage des rues des A 05/04/18 350 AON NON NON 3 villes de San Pedro (01 lot) posteriori 11TPU0 Travaux d'achèvement de l'hôtel de A 15/01/18 4 065 AON NON NON 3 ville de Bouaké posteriori Sous-composante C2. Appui et Renforcement des Capacités des C.2 Communes de Bouaké et San- - Pedro Composante D : Gestion du D projet 01FPU0 Acquisition de 3 véhicules (1 de 108,33 CFN NON NON 4 type 4x4 et 2 pick up) TOTAL 65 751 Plan de passation des marchés simplifié Mars 2018 – ‘Cellule Marché PUDICAS’ III. Sélection de Consultants 3.1. Seuil d’examen préalable Les contrats qui seront soumis à l'examen préalable de la Banque conformément aux dispositions de l'Annexe 1 des Directives de Sélection et Emploi de Consultants de janvier 2011 révisées en juillet 2014 Nature de Méthode de passation de Valeur Contrats soumis à dépenses marchés seuil du examen préalable contrat $EU Consultant SFQC1, SFQ2, SMC3, SCBD4, ≥ 300.000 Tout contrat de 2.000.000 s $EU ou plus SFQC, SFQ, SMC, SCBD, QC5 < 300.000 Firmes Contrat ≥ 100,000 Entente directe (*) Pas de seuil Et Audit financier Consultant Consultant individuel (AMI) ≥ 100.000 s Tout contrat de 400.000 $ EU ou plus Individuels Consultant individuel (3 CV) < 100.000 Contrat ≥ 100,000 Entente directe (*) Pas de seuil Et personnel permanent du projet Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. (*) Le justificatif de toute sélection par entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 3.2. Liste restreinte composée entièrement de Consultants Nationaux : Liste restreinte de consultants pour prestations de services, d’un coût estimatif inférieur à 300 000$ US ou équivalent par contrat, peut être entièrement 1 SFQC : Sélection Fondée sur la Qualité et le Coût 2 SFQ : Sélection fondée sur la qualité 3 SMC : Sélection au moindre coût 4 SCBD : Sélection dans le cadre d’un budget déterminé 5 QC : Sélection basée sur les Qualifications des Consultants CI : Consultant Individuel : AMI : Avis à Manifestation d’Intérêt Plan de passation des marchés simplifié Mars 2018 – ‘Cellule Marché PUDICAS’ composée de Consultants nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants. Type de marchés : services de Consultants Coût estimé Méthode Liste des ensembles de Exam. par Ouverture en milliers passation Commentaire marchés Banque plis prévue $EU Marchés A priori/A N° Description Date prévue posteriori Composante A: Renforcement des A infrastructures économiques 1300 des agglomérations de Bouaké et San-Pedro Sous-composante A1. Renforcement des A.1 900 infrastructures économique de Bouaké Recrutement d'un consultant 01SPU0 pour le suivi et contrôle des 300 SBQC A posteriori 30/05/18 : 1 travaux d'aménagement de la traversée de Bouaké (A3) Recrutement d'un consultant pour le suivi et contrôle des 02SPU0 travaux d'aménagement de la 150 SBQC A posteriori 30/01/18 1 voie de Tolakouadiokro jusqu’au dépôt de GESTOCI (T03) Recrutement d’un Consultant pour l’étude de définition Commented [K1]: Justifications de l’ED ??? d’aménagements fonctionnels de 11 principaux carrefours sur Commented [MM2R2]: Nous en avons 04SPU0 Entente direct la traversée sud-nord de la ville 62,32 A posteriori 04/04/2018 discuté. On a besoins d’une note justificative 1 TRANSITEC de Bouaké par la route A3 et dans STEP. d’identification d’itinéraires de contournement de cette voie en phase de travaux 15SPU0 Recrutement d'un consultant Commented [K3]: On parle bien d’un individuel pour l’élaboration de 100 SBQC A posteriori 15/05/18 consultant individuel ??? Si oui, CI(AMI) 1 plan d’affaire de MGB Sous-composante A2. Renforcement des A.2 400 infrastructures économiques et touristiques de San-Pedro Recrutement d'un consultant pour le suivi des travaux de renforcement de la rue des 06SPU0 grumiers, d'aménagement de 300 SBQC A posteriori 30/04/18 1 voies de desserte de l’aéroport, du port et de la zone touristique balnéaire Composante B : Soutien au B développement du secteur 600 privé à Bouaké et San-Pedro Sous-composante B1. Soutien au développement B.1 300 du secteur privé à San-Pedro et Bouaké Recrutement d'un consultant pour l’étude d’état des lieux de l’écosystème entrepreneurial, la 08SPU0 conception et la mise en œuvre 300 SBQC A posteriori 30/04/18 2 d’un programme d’entrepreneuriat, et de son manuel d’exécution à Bouaké et San Pedro Plan de passation des marchés simplifié Mars 2018 – ‘Cellule Marché PUDICAS’ Sous-composante B2. B.2 300 Renforcement institutionnel Recrutement d'un consultant Commented [K4]: Est-ce qu’une firme ne pour le renforcement des serait pas plus appropriée pour ce mandat ? capacités des structures d'appui 09SPU0 au PME et du Ministère en Commented [MM5R5]: Si j’ai bien compris 3030 CI(AMI) A posteriori 30/01/18 2 charge de l’entrepreneuriat ainsi des TDR, c’est pour l’eboration d’un plan de qu’une assistance technique reonfocement de capacité. Et pour cela, je n’ai pour la mise œuvre du de problem d’avoir un consultante individuale. programme d’entrepreneuriat Mais il faut changer le title, et budget Composante C : Amélioration de l’institution, Cadre C Règlementaire et Gestion 1 751 Urbain des Villes de Bouaké et San-Pedro Sous-composante C1. Amélioration de la fonctionnalité urbanistique 1351 et du cadre de vie des villes de Bouaké et San-Pedro 07SPU0 Recrutement d’un consultant Ouverture de la Commented [K6]: S’agit-il d’une ouverture de pour l’élaboration des plans 250 SBQC A posteriori 25/01/18 1 DP : 02/05/18 plis techniques ? d’urbanisme de détails BOUAKE Recrutement d’un consultant 13SPU0 pour l’élaboration des plans 250 SBQC A posteriori 25/01/18 1 d’urbanisme de détails SAN PEDRO Recrutement d'un consultant Commented [K7]: S’agit-il d’une ouverture de 11SPU0 pour la réalisation des études Ouverture de la plis techniques ? 150 SBQC A posteriori 25/01/18 1 sur l'adressage des rues à DP : 02/05/18 Bouake Recrutement d'un consultant 12SPU0 pour la réalisation des études 150 SBQC A posteriori 25/01/18 1 sur l'adressage des rues à San Pedro Recrutement d'un consultant 013SPU pour l'aménagement paysager 75 CI - 3 CV A posteriori 10/02/17 03 et jardins publics de San Pedro Recrutement d'un consultant 14SPU0 pour l'aménagement paysager 76 CI - 3 CV A posteriori 10/02/17 1 et jardins publics de Bouaké Recrutement d'un consultant Commented [K8]: Même commentaire que ci- 15SPU0 pour l'étude, suivi et contrôle de Ouverture de la dessus 200 SBQC A posteriori 16/01/18 3 la réhabilitation de l'hôtel de DP : 16/01/18 ville de Bouaké Etudes techniques APD + Constat d’impact le CIES à 17SPU0 environnemental et social (CIES) 129 QC A postériori 10/02/17 transmettre 3 pour l’achèvement de l’hôtel de EN COURS ville de BOUAKE 16SPU0 Audit techniques de l’hôtel de A postériori Dépenses 13 QC 10/02/17 3 ville de BOUAKE priori rétroactives Constat d’impact environnemental et social (CIES) A le CIES à 18SPU0 + PAR pour l’aménagement du 71 CI - 3 CV postérioriri 10/02/17 transmettre 3 centre de traitement de déchets ori EN COURS à BOUAKE Sous-composante C2. Appui et Renforcement des 400 Capacités des Communes de Bouaké et San-Pedro Evaluation stratégique (ES) 19SPU0 de la filière « Gestion des TdR en cours de 300 SBQC A posteriori 17/01/18 3 déchets » à BOUAKE et SAN préparation PEDRO Recrutement d'un consultant pour la réalisation des études et l’assistance pour la mise en 20SPU0 TdR en cours de concession de l’activité 100 SBQC A posteriori 15/12/17 3 préparation économiques de la gestion des aires de stationnement pour Bouaké et San Pedro Plan de passation des marchés simplifié Mars 2018 – ‘Cellule Marché PUDICAS’ Composante D : Gestion du D 732 projet Audit pour trois 21SPU0 3 Audit Financier 300 SBQC A PRIORI 12/12/17 ans (2018, 2019, 2020) Recrutement d’un consultant individuel pour une assistance technique à 22SPU0 la Cellule de Coordination du 100 CI - 3 CV A posteriori 15/02/2018 Nouvelle activité 1 PIDUCAS pour la préparation des études de la composante 3 du projet Recrutement d’un Contrat en 50 CI (AMI) A PRIORI 05/10/17 coordonnateur adjoint négociation Recrutement d’un Contrat en spécialiste en passation de 30 CI (AMI) A PRIORI 05/10/17 négociation marché dédié Recrutement d’un Rapport encours spécialiste en sauvegarde 30 CI (AMI) A PRIORI de rédaction environnementaliste dédié Recrutement d’un Rapport encours spécialiste en sauvegarde 30 CI (AMI) A PRIORI de rédaction social dédié Recrutement d’un 30 CI (AMI) A Posteriori comptable Recrutement d’un assistant 18 CI (AMI) A Posteriori 30/10/17 comptable Recrutement d’un assistant 30 CI (AMI) A PRIORI 11/10/17 En suspend auditeur interne Recrutement d’un 30 CI (AMI) A PRIORI 04/10/17 spécialiste en entreprenariat Recrutement d’un assistant 18 CI (AMI) A Posteriori 30/10/17 en passation de marché Recrutement d’un spécialiste en suivi et 30 CI (AMI) A PRIORI 16/11/17 évaluation TOTAL 4283 Plan de passation des marchés simplifié Mars 2018 – ‘Cellule Marché PUDICAS’ IV : RENFORCEMENT DE CAPACITE Dans cette section, lister les activités de renforcement de capacités approuvées et leur planning Réf. No Montant estimatif Durée estimée Date de Description du contrat Commentaires ($EU) (jours) début TOTAL 0 NB: 600 FCFA =1$ USD Plan de passation des marchés simplifié Mars 2018 – ‘Cellule Marché PUDICAS’ V. RECAPITULATION V.1. Financement PUDICAS PART BAILLEUR Commenta Nombre Montant estimatif N° ires Composante/ Catégories ordre en millier en milieu de $ Contrats F CFA EU Composante A : Renforcement des infrastructures 36 318 A 12 60 530 économiques des 000 agglomérations de Bouaké et San-Pedro 27 234 Travaux et fournitures par AOI 2 000 45 390 Travaux et fournitures par AON 3 8 364 000 13 940 Consultants 7 720 000 1 200 Composante B : Soutien au B développement du secteur privé 3 420 000 700 à Bouaké et San-Pedro Travaux et fournitures par AOI - Travaux et fournitures par AON - - Consultation de fournisseur - Consultants 3 420 000 700 - Composante C : Amélioration de l’institution, Cadre C Règlementaire et Gestion Urbain 15 4 903 200 8 172 des Villes de Bouaké et San- Pedro Travaux et fournitures par AOI - Travaux et fournitures par AON 5 3 852 600 6 421 Consultants 10 1 050 600 1 751 Composante D : Gestion du D Projet 1 180 000 300 Travaux et fournitures par AOI - Travaux et fournitures par AON - Consultants 1 180 000 300 41 821 TOTAL 31 200 69 702 Plan de passation des marchés simplifié Mars 2018 – ‘Cellule Marché PUDICAS’ PROCUREMENT Cote d'Ivoire : CI-Infrastructure for Urban Development and Competitiveness of second cities PLAN General Information Country: Cote d'Ivoire Bank’s Approval Date of the Original Procurement Plan: 2018-06-06 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151324 GPN Date: 2018-08-14 Project Name: CI-Infrastructure for Urban Development and Competitiveness of second cities Loan / Credit No: IDA / 60620 C Executing Agency(ies): I-Infrastructure for Urban Development and Competitiveness of Second Cities WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 07TPU03 / Travaux Improving Institutions, Pending Single Stage - One 2019-02- d'aménagement paysager et IDA / 60620 Regulations and Urban Post Request for Bids Open - National 828,000.00 0.00 Implementat 2018-05-22 2018-05-27 2018-06-26 2018-07-06 2018-08-10 Envelope 06 jardins publics (01lot) BOUAKE Management ion 08TPU03 / Travaux Improving Institutions, Pending d'aménagement paysager et Single Stage - One 2019-02- IDA / 60620 Regulations and Urban Post Request for Bids Open - National 828,000.00 0.00 Implementat 2018-05-22 2018-05-27 2018-06-26 2018-07-06 2018-08-10 jardins publics (01 lot) SAN Envelope 06 Management ion PEDRO 10TPU03 / Travaux Improving Institutions, Pending Single Stage - One 2019-01- d'adressage des rues des IDA / 60620 Regulations and Urban Post Request for Bids Open - National 350,000.00 0.00 Implementat 2018-04-25 2018-04-30 2018-05-30 2018-06-09 2018-07-14 Envelope 10 villes de San Pedro (01 lot) Management ion 11TPU03 / Travaux Improving Institutions, Single Stage - One 3,679,439.2 2019-01- d'achèvement de l'hôtel de IDA / 60620 Regulations and Urban Post Request for Bids Open - National 4,065,000.00 Signed 2018-04-25 2019-01-30 2018-04-30 2018-05-30 2019-03-26 2018-06-09 2019-04-26 2018-07-14 2019-07-08 Envelope 8 10 ville de Bouaké Management 01TPU01 / Travaux d'aménagement de la Enhancing the Performance Single Stage - One 28,418,000.0 Under 2019-11- traversée de Bouaké (A3) (01 IDA / 60620 Prior Request for Bids Open - International 0.00 2018-07-31 2018-08-05 2018-11-23 2018-12-03 2019-01-22 of Economic Infrastructure Envelope 0 Review 18 lots) y compris EP et aménagement paysager CI-PIDUCAS-87027-CW-RFB / Travaux d'aménagement d'infrastructures routières Pending Enhancing the Performance Single Stage - One 2019-09- dans la ville de San Pedro : IDA / 60620 Post Request for Bids Open - National 2,891,268.61 0.00 Implementat 2018-11-13 2018-11-18 2018-12-30 2019-01-29 2019-03-05 of Economic Infrastructure Envelope 01 Aménagement de la voie ion d'accès vers l'aeroport de San Pedro 09TPU03 / Travaux Improving Institutions, Pending Single Stage - One 2019-12- d'adressage des rues des IDA / 60620 Regulations and Urban Post Request for Bids Open - National 350,000.00 0.00 Implementat 2019-03-19 2019-03-24 2019-04-23 2019-05-03 2019-06-07 Envelope 04 villes de Bouaké (01 lot) Management ion 02TPU01 / Aménagement de la voie de Tolakouadiokro Under Enhancing the Performance Single Stage - One 2019-07- jusqu'au dépôt de GESTOCI y IDA / 60620 Post Request for Bids Open - National 7,411,284.06 0.00 Implementat 2018-04-11 2018-07-10 2018-04-16 2018-08-14 2018-08-24 2018-09-28 of Economic Infrastructure Envelope 25 compris l'EP et aménagement ion paysager CI-PIDUCAS-109143-CW- RFB / Travaux d'aménagement Pending Enhancing the Performance Single Stage - One 2020-02- d'infrastructures à San Pedro : IDA / 60620 Post Request for Bids Open - National 6,000,000.00 0.00 Implementat 2019-04-15 2019-04-20 2019-06-01 2019-07-01 2019-08-05 of Economic Infrastructure Envelope 01 Aménagement de la voie ion touristique Balmer CI-PIDUCAS-109157-CW- RFB / Travaux d'aménagement de la traversée de la ville de Enhancing the Performance Single Stage - One 32,948,620.0 18,255,328. 2019-12- IDA / 60620 Prior Request for Bids Open - International Signed 2019-04-16 2019-05-08 2019-04-21 2019-05-14 2019-04-24 2019-08-27 2019-05-24 2019-09-17 2019-06-28 2019-09-24 Bouaké par la A3 y compris of Economic Infrastructure Envelope 0 03 25 l'manenagement paysager et eclairage public. CI-PIDUCAS-109145-CW- RFB / Travaux d'aménagement d'infrastructures routières Enhancing the Performance Single Stage - One 20,456,321.0 12,234,754. 2020-02- dans la ville de San Pedro : IDA / 60620 Prior Request for Bids Open - International Signed 2019-04-30 2019-05-08 2019-05-05 2019-07-12 2019-06-16 2019-08-28 2019-07-16 2019-11-18 2019-08-20 2020-02-03 of Economic Infrastructure Envelope 0 31 16 Aménagement de la rue des grumiers et Rond point CHR Carrefour CARGILL 008FPME01 / Travaux Pending Supporting Private Sector Request for Single Stage - One 2019-12- d’aménagement d'une salle IDA / 60620 Post Limited 8,333.00 0.00 Implementat 2019-10-05 2019-11-16 Development Quotations Envelope 16 multimédia ion 010FPME01 / Aménagement Pending Supporting Private Sector Request for Single Stage - One 2019-12- de deux centres de soutien à IDA / 60620 Post Limited 116,667.00 0.00 Implementat 2019-10-20 2019-12-01 Development Quotations Envelope 31 Bouaké et à San Pedro ion CI-PIDUCAS-186100-CW- Pending RFB / Travaux d'aménagement Enhancing the Performance Single Stage - One 2021-07- IDA / 60620 Post Request for Bids Open - National 833,333.00 0.00 Implementat 2020-10-30 2020-11-04 2020-12-04 2020-12-19 2021-01-23 d'une aire de séchage au sein of Economic Infrastructure Envelope 22 ion du Marché de gros de Bouaké CI-PIDUCAS-186106-CW- Pending Enhancing the Performance Request for Single Stage - One 2021-03- RFQ / Travaux IDA / 60620 Post Limited 108,333.00 0.00 Implementat 2020-10-27 2020-12-22 of Economic Infrastructure Quotations Envelope 22 d'aménagement d'une station ion de lavage CI-PIDUCAS-186108-CW- RFQ / Travaux de Pending Enhancing the Performance Request for Single Stage - One 2021-03- réhabilitation du Marché de IDA / 60620 Post Limited 83,333.00 0.00 Implementat 2020-10-26 2020-12-21 of Economic Infrastructure Quotations Envelope 21 Gros de Bouaké (sanitaires, ion peinture, etc.) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 01FPU04 / Acquisition de 3 véhicules (2 pick up et une Request for Single Stage - One IDA / 60620 Project Management Post Limited 127,273.00 106,421.65 Signed 2018-04-18 2018-05-31 2018-06-13 2018-09-21 2018-09-11 4x4) pour la cellule de Quotations Envelope coordination 001FPME01 / Achat de Improving Institutions, matériel informatique : 20 Request for Single Stage - One IDA / 60620 Regulations and Urban Post Limited 25,000.00 30,644.86 Signed 2019-09-14 2019-12-17 2019-10-14 2020-01-29 2019-11-13 ordinateurs portables et 5 Quotations Envelope Management imprimantes 004FPME01 / Equipements et Pending Supporting Private Sector Request for Single Stage - One mobiliers des bureaux de IDA / 60620 Post Limited 25,000.00 0.00 Implementati 2019-09-30 2019-10-29 2019-11-28 Development Quotations Envelope Bouaké et San Pedro on 002FPME01 / Acquisition de Supporting Private Sector Request for Single Stage - One 04 véhicules de type 4X4 dont IDA / 60620 Post Limited 166,667.00 141,711.77 Signed 2019-09-30 2019-12-04 2019-10-29 2020-01-13 2019-11-28 Development Quotations Envelope deux Pick up 003FPME01 / Acquisition de Pending logiciels d'analyses Supporting Private Sector Request for Single Stage - One IDA / 60620 Post Limited 25,000.00 0.00 Implementati 2019-10-01 2019-10-30 2019-11-29 statistiques (Stata, SPSS ou Development Quotations Envelope on SAS) Pending 006FPME01 / Equipement du Supporting Private Sector Request for Single Stage - One IDA / 60620 Post Limited 50,000.00 0.00 Implementati 2019-10-02 2019-11-13 2019-12-13 centre de reprographie Development Quotations Envelope on 009FPME01 / Equipement d'une salle multimédia à Pending Supporting Private Sector Request for Single Stage - One Abidjan (caméra, IDA / 60620 Post Limited 58,333.00 0.00 Implementati 2019-10-13 2019-11-24 2019-12-24 Development Quotations Envelope rétroprojecteur, des micros, on équipement audio) 012ACIPME01 / Assurance des véhicules de l'ACI PME Supporting Private Sector IDA / 60620 Post Direct Selection Direct 6,333.00 6,931.09 Signed 2020-03-18 2020-03-18 2020-03-23 2020-02-19 2020-04-27 2020-11-05 2021-04-27 acquis dans le cadre du Development PIDUCAS 013ACIPME01 / Assurance pour le personnel de ACI PME Supporting Private Sector IDA / 60620 Post Direct Selection Direct 9,000.00 12,090.70 Signed 2020-03-05 2020-03-05 2020-03-10 2020-03-03 2020-04-14 2020-11-05 2021-04-14 recruté dans le cadre du Development PIDUCAS CI-PIDUCAS-180107-GO-RFB Pending / Acquisition d'un nouveau Enhancing the Performance Single Stage - One IDA / 60620 Post Request for Bids Open - National 367,000.00 0.00 Implementati 2020-06-30 2020-07-05 2020-08-04 2020-08-19 2020-09-23 2021-03-22 pont bascule pour le Marché of Economic Infrastructure Envelope on de Gros de Bouaké 05OCPVN01 / Acquisition de matériels informatiques et assimilés (2 ordinateurs de Pending Supporting Private Sector Request for Single Stage - One bureau, 2 onduleurs, 2 ordi IDA / 60620 Post Limited 15,000.00 0.00 Implementati 2020-11-15 2021-01-10 2021-02-09 Development Quotations Envelope portables, 3 imprimantes, 2 on appareils photos) plus les logiciels 06OCPVN01 / Acquisition de Pending Supporting Private Sector Request for Single Stage - One matériels roulant ( 1 véhicule IDA / 60620 Post Limited 158,833.00 0.00 Implementati 2020-11-15 2021-01-10 2021-02-09 Development Quotations Envelope 4x4 et 2 pickup et 4 motos) on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 007FPME01 / Contrat de Pending Supporting Private Sector Request for Single Stage - One gardiennage des bureaux de IDA / 60620 Post Limited 50,000.00 0.00 Implementati 2019-10-02 2019-11-27 2020-02-25 Development Quotations Envelope Bouaké et San Pedro on 06OCPV01 / Recrutement d’un prestataire de services Supporting Private Sector Request for Single Stage - One IDA / 60620 Post Limited 95,000.00 0.00 Canceled 2020-03-30 2020-05-25 2020-11-21 pour l’organisation des Development Quotations Envelope ateliers de formation 07OCPVN01 / Assurance tout risque pour 18 mois pour les Pending Supporting Private Sector Request for Single Stage - One véhicules et motos de l'OCPV IDA / 60620 Post Limited 8,333.00 0.00 Implementati 2020-11-30 2021-01-25 2022-01-25 Development Quotations Envelope acquis dans le cadre du on PIDUCAS CI-PIDUCAS-231502-NC- Pending RFQ / Assurance du personnel Supporting Private Sector Request for Single Stage - One IDA / 60620 Post Limited 18,333.00 0.00 Implementati 2021-05-17 2021-07-12 2022-07-07 ACIPME dans le cadre du Development Quotations Envelope on PIDUCAS CI-PIDUCAS-231503-NC- Pending RFQ / Assurance des Supporting Private Sector Request for Single Stage - One IDA / 60620 Post Limited 6,667.00 0.00 Implementati 2021-05-17 2021-07-12 2022-07-07 véhicules ACIPME acquis dans Development Quotations Envelope on le cadre du PIDUCAS CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Improving Institutions, Quality And Cost- Pending 21SCPU03 / Audit Financier IDA / 60620 Regulations and Urban Post Open - International 300,000.00 0.00 2018-06-27 2018-07-11 2018-07-31 2018-08-30 2018-09-09 2018-09-24 2018-10-14 2019-10-14 Based Selection Implementation Management 13SCPU01 / Recrutement Improving Institutions, d'un consultant pour Quality And Cost- IDA / 60620 Regulations and Urban Post Open - International 250,000.00 523,367.33 Signed 2018-04-25 2020-02-06 2018-05-09 2020-04-15 2018-05-24 2020-06-09 2018-06-23 2020-08-04 2018-07-03 2020-10-27 2018-07-13 2018-08-17 2020-09-28 2018-11-15 l'élaboration des plans Based Selection Management d'urbanisme de détails de SAN PEDRO Page 2 20SCPU03 / Recrutement d'un consultant pour la réalisation des études et Improving Institutions, l'assistance pour la mise en Quality And Cost- Pending IDA / 60620 Regulations and Urban Post Open - International 100,000.00 0.00 2018-10-20 2018-11-03 2018-11-23 2018-12-23 2019-01-02 2019-01-17 2019-02-06 2019-05-07 concession de l'activité Based Selection Implementation Management économiques de la gestion des aires de stationnement pour Bouaké et San Pedro CI-PIDUCAS-77586-CS-CQS / Recrutement d'un cabinet de consultant pour la réalisation Consultant Enhancing the Performance Pending d'une étude de plan d'actions IDA / 60620 Post Qualification Open - National 162,346.00 0.00 2016-10-02 2016-10-26 2017-01-03 2017-02-02 2017-03-09 2017-09-05 of Economic Infrastructure Implementation de réinstallation PAR des sous Selection projets dans la commune de BOUAKE CI-PIDUCAS-87034-CS-CQS / Recrutement d'un Consultant/Firme pour la Consultant réalisation de l'étude de Enhancing the Performance Pending IDA / 60620 Post Qualification Open - National 65,146.58 0.00 2018-11-26 2018-12-17 2019-01-30 2019-03-01 2019-04-05 2019-10-02 viabilité économique et of Economic Infrastructure Implementation Selection commerciale des sites désignés pour être des aires de stationnement à Bouaké CI-PIDUCAS-87042-CS-QCBS / Recrutement d'un cabinet d'audit pour l'exécution de la Supporting Private Sector Quality And Cost- Pending IDA / 60620 Post Open - National 407,166.12 0.00 2018-12-11 2019-01-01 2019-02-14 2019-03-14 2019-04-13 2019-05-18 2019-06-22 2020-06-21 mission suivi et contrôle pour Development Based Selection Implementation le programme de l'entreprenariat CI-PIDUCAS-77600-CS-CQS / Recrutement d'un cabinet de consultant pour l'actualisation Improving Institutions, Consultant Pending des études de Constat IDA / 60620 Regulations and Urban Post Qualification Open - National 162,346.00 0.00 2016-09-21 2016-10-12 2016-12-05 2017-01-04 2017-02-08 2017-08-07 Implementation d'Impact Environnemental et Management Selection Social (CIES) de la ville de BOUAKE Quality And Cost- Pending MOF-REF-2 / Technical Audit IDA / 60620 Project Management Post Open - National 240,000.00 0.00 2019-10-10 2019-10-31 2019-12-14 2020-01-11 2020-02-10 2020-03-16 2020-04-20 2021-04-20 Based Selection Implementation 07SCPU01 / Recrutement d'un consultant pour le suivi et contrôle des travaux de Enhancing the Performance Quality And Cost- Pending IDA / 60620 Post Open - National 200,000.00 0.00 2019-04-05 2019-04-19 2019-05-04 2019-06-03 2019-06-13 2019-06-28 2019-07-18 2020-05-13 d'aménagement d'un parking of Economic Infrastructure Based Selection Implementation pour stationnement de poids lourds 17SCPU03 / Recrutement d'un cabinet Etudes Improving Institutions, techniques (APD + Constat Quality Based Pending IDA / 60620 Regulations and Urban Post Open - National 137,720.01 0.00 2018-03-05 2018-03-19 2018-04-08 2018-05-08 2018-05-18 2018-05-28 2018-11-14 2019-02-12 d'impact environnemental et Selection Implementation Management social (CIES)) pour la réhabilitation de l'hôtel de ville de BOUAKE 05SCPU01 / Recrutement d'une firme pour l'élaboration Enhancing the Performance Quality And Cost- Pending IDA / 60620 Post Open - National 150,000.00 0.00 2018-11-14 2018-11-28 2018-12-13 2019-01-12 2019-01-22 2019-02-06 2019-03-04 2019-08-11 de plan d'affaire du Marché de of Economic Infrastructure Based Selection Implementation Gros de Bouaké Improving Institutions, 16SCPU01 / Audit technique Quality Based Pending IDA / 60620 Regulations and Urban Post Open - National 15,000.00 0.00 2018-03-12 2018-04-02 2018-05-16 2018-06-13 2018-07-13 2018-08-12 2018-09-16 2019-09-16 de l'hôtel de ville de Bouaké Selection Implementation Management 02SCPU01 / Recrutement d'un consultant/Firme pour le suivi et contrôle des travaux Enhancing the Performance Quality And Cost- Pending d'aménagement de la IDA / 60620 Post Open - National 328,990.23 0.00 2018-04-17 2018-05-01 2018-05-16 2018-06-15 2018-06-25 2018-07-10 2018-07-30 2019-05-26 of Economic Infrastructure Based Selection Implementation pénétrante de Tolakouadiokro (T03) jusqu'au dépôt de GESTOCI (T03) 01SCPU01 / Recrutement d'un consultant pour le suivi Enhancing the Performance Quality And Cost- et contrôle des travaux IDA / 60620 Post Open - National 1,250,000.00 814,863.49 Signed 2018-12-12 2019-08-26 2018-12-26 2019-09-13 2019-01-10 2019-10-01 2019-02-09 2019-11-12 2019-02-19 2019-11-15 2019-03-06 2019-12-03 2019-03-26 2020-01-29 2020-01-20 of Economic Infrastructure Based Selection d'aménagement de la traversée de Bouaké (A3) CI-PIDUCAS-77601-CS-CQS / Recrutement d'un cabinet pour l'Actualisation des études techniques d'Avant Improving Institutions, Consultant Projet Détaillé APD Pending IDA / 60620 Regulations and Urban Post Qualification Open - National 162,346.00 0.00 2016-10-04 2016-10-25 2017-01-03 2017-02-02 2017-03-09 2017-09-05 d'Aménagement de la Implementation Management Selection traversée A3, de l'aire de repos au corridor Nord et la voie de Tolakouadiokro dans la commune de BOUAKE. CI-PIDUCAS-91292-CS-QCBS / Recrutement d'une Firme Improving Institutions, Quality And Cost- Pending pour l'élaboration du Plan IDA / 60620 Regulations and Urban Post Open - National 250,000.00 0.00 2018-12-12 2019-01-02 2019-02-15 2019-03-15 2019-04-14 2019-05-19 2019-06-23 2020-06-22 Based Selection Implementation d'Urbanisme de Détail de la Management ville de Bouaké 10SCPU01 / Recrutement Improving Institutions, d'un consultant pour Quality And Cost- IDA / 60620 Regulations and Urban Prior Open - International 250,000.00 0.00 Canceled 2018-04-25 2018-11-08 2018-05-09 2018-11-12 2018-05-24 2018-06-23 2018-07-03 2018-07-18 2018-08-12 2019-02-08 l'élaboration des plans Based Selection Management d'urbanisme de détails de Bouaké 06SCPU01 / Recrutement d'un consultant/Firme pour le suivi et le contrôle des travaux de renforcement de la Enhancing the Performance Quality And Cost- Under IDA / 60620 Post Open - National 486,091.00 0.00 2018-11-14 2018-06-28 2018-11-28 2018-12-13 2019-01-12 2019-01-22 2019-02-06 2019-03-04 2019-12-29 rue des grumiers, of Economic Infrastructure Based Selection Implementation d'aménagement de voies de desserte de l'aéroport, du port et de la zone touristique balnéaire 12SCPU01 / Recrutement Improving Institutions, d'un consultant pour la Quality And Cost- IDA / 60620 Regulations and Urban Post Open - International 150,000.00 0.00 Canceled 2018-11-20 2018-12-04 2018-12-19 2019-01-18 2019-01-28 2019-02-12 2019-03-09 2019-09-05 réalisation des études sur Based Selection Management l'adressage des rues à San Pedro Page 3 19SCPU03 / Évaluation Improving Institutions, stratégique (ES) de la filière « Quality And Cost- IDA / 60620 Regulations and Urban Post Open - International 300,000.00 0.00 Canceled 2019-01-16 2019-01-30 2019-02-12 2019-02-14 2019-03-16 2019-03-26 2019-04-10 2019-04-30 2019-10-27 Gestion des déchets » à Based Selection Management BOUAKE et SAN PEDRO CI-PIDUCAS-109151-CS- Improving Institutions, QCBS / Evaluation statégique Quality And Cost- Pending IDA / 60620 Regulations and Urban Post Open - International 280,000.00 0.00 2019-04-15 2019-05-06 2019-06-19 2019-07-17 2019-08-16 2019-09-20 2019-10-25 2020-10-24 (ES) de la filière des déchets Based Selection Implementation Management dans la ville de Bouaké. CI-PIDUCAS-109153-CS- QCBS / Evaluation strategique Improving Institutions, Quality And Cost- Under (ES) de la filière Gestion des IDA / 60620 Regulations and Urban Post Open - International 280,000.00 0.00 2019-05-15 2019-09-25 2019-06-05 2019-07-19 2019-08-16 2019-09-15 2019-10-20 2019-11-24 2020-11-23 Based Selection Implementation dechets dans la ville de San Management Pedro. CI-PIDUCAS-109155-CS-CQS / Recrutement d'un consultant Improving Institutions, Consultant Pending Firme pour le Suivi et contrôle IDA / 60620 Regulations and Urban Post Qualification Open - National 210,000.00 0.00 2019-04-09 2019-04-30 2019-06-13 2019-07-13 2019-08-17 2020-02-13 Implementation des travaux de l'hôtel de ville Management Selection de Bouaké. CI-PIDUCAS-140229-CS- QCBS / Mission d’études APS Enhancing the Performance Quality And Cost- Under et APD pour l’aménagement IDA / 60620 Post Open - National 187,000.00 0.00 2019-10-21 2020-05-08 2019-11-04 2020-05-18 2019-11-21 2019-12-21 2019-12-31 2020-01-14 2020-01-26 2020-06-09 of Economic Infrastructure Based Selection Implementation d’une aire de repos dans la ville de San Pedro 01SCOCPV01 / Recrutement d’un consultant pour faire l’état des lieux (structurations, Supporting Private Sector Quality And Cost- fonctionnement, viabilité IDA / 60620 Post Open - National 133,333.00 0.00 Canceled 2020-04-14 2020-04-28 2020-05-18 2020-06-17 2020-07-02 2020-07-14 2020-08-09 2020-12-07 Development Based Selection financière…) des organisations de producteurs et de commercialisation des produits vivriers. 02OCPV01 / Recrutement d’un consultant pour appuyer Supporting Private Sector Quality And Cost- Pending les opérateurs de la chaîne de IDA / 60620 Post Open - National 533,333.00 0.00 2020-03-30 2020-04-13 2020-05-03 2020-06-02 2020-06-17 2020-06-29 2020-07-25 2020-11-22 Development Based Selection Implementation commercialisation des produits vivriers. 04OCPV01 / Recrutement d’un cabinet pour faire l’audit Supporting Private Sector Fixed Budget IDA / 60620 Post Open - National 141,667.00 0.00 Canceled 2020-03-31 2020-06-03 2020-04-14 2020-05-13 2020-06-12 2020-06-27 2020-07-25 2020-08-08 2020-12-06 organisationnel et fonctionnel Development Selection de l’OCPV. 05OCPV01 / Recrutement d’un consultant pour la mise en place d’un système de Supporting Private Sector Quality And Cost- IDA / 60620 Post Open - National 170,000.00 0.00 Canceled 2020-04-15 2020-04-29 2020-05-19 2020-06-18 2020-07-03 2020-07-15 2020-08-10 2020-12-08 collecte de données Development Based Selection économiques avec un progiciel de géolocalisation. CI-PIDUCAS-180100-CS- QCBS / Recrutement d'un consultant firme pour la Enhancing the Performance Quality And Cost- Under IDA / 60620 Post Open - National 50,000.00 0.00 2020-06-22 2020-06-17 2020-07-06 2020-10-01 2020-08-04 2020-09-03 2020-09-18 2020-09-30 2020-10-28 2020-11-27 réalisation du CIES des of Economic Infrastructure Based Selection Implementation barreaux de la traversée de Bouaké par la A3 CI-PIDUCAS-181042-CS- QCBS / Recrutement d’un consultant/Firme pour Supporting Private Sector Quality And Cost- Pending l’évaluation des charges IDA / 60620 Post Open - National 117,000.00 0.00 2020-06-29 2020-07-20 2020-08-18 2020-08-21 2020-09-05 2020-09-20 2020-10-19 2021-01-17 Development Based Selection Implementation locatives et la valorisation du patrimoine immobilier de l’hôtel de ville de BOUAKE CI-PIDUCAS-186113-CS- Improving Institutions, QCBS / Recrutement d'un Quality And Cost- Under IDA / 60620 Regulations and Urban Post Open - National 1,250,000.00 0.00 2020-08-04 2020-07-30 2020-08-18 2020-08-12 2020-09-12 2020-10-12 2020-10-22 2020-11-26 2020-12-25 2021-02-17 consultant pour la mise à jour Based Selection Implementation Management des plans cadastraux CI-PIDUCAS-186120-CS-LCS / Recrutement d’un cabinet Supporting Private Sector Least Cost Under pour faire l’audit IDA / 60620 Post Open - National 141,667.00 0.00 2020-08-04 2020-10-01 2020-08-25 2020-10-01 2020-10-08 2020-10-01 2020-11-05 2020-12-05 2021-01-09 2021-02-13 2021-08-12 Development Selection Implementation organisationnel et fonctionnel de l’OCPV. 01SCMPME 02 / Recrutement d’un Cabinet de consultants Improving Institutions, pour élaborer la Stratégie Quality And Cost- Under IDA / 60620 Regulations and Urban Post Open - National 166,667.00 0.00 2020-11-30 2021-06-21 2020-12-21 2021-06-22 2021-02-03 2021-03-03 2021-04-02 2021-05-07 2021-06-11 2021-09-09 Nationale de Développement Based Selection Implementation Management de l’Entrepreneuriat et de l’Innovation 2021-2025 02SCMPME02 / Recrutement d’un Cabinet de consultants chargé de réaliser l'évaluation Improving Institutions, Quality And Cost- Under des services financiers et non IDA / 60620 Regulations and Urban Post Open - National 116,667.00 0.00 2020-11-27 2021-04-16 2020-12-18 2021-06-22 2021-01-31 2021-02-28 2021-03-30 2021-05-04 2021-06-08 2021-09-06 Based Selection Implementation financiers des projets et Management programmes publics et privés en faveur des PME 03SCMPME02 / Recrutement d’un consultant pour la mise en place d’un mécanisme de Improving Institutions, Quality And Cost- collecte et de mise à jour des IDA / 60620 Regulations and Urban Post Open - National 83,333.00 0.00 Canceled 2020-12-01 2020-12-22 2021-02-04 2021-03-04 2021-04-03 2021-05-08 2021-06-12 2021-09-10 Based Selection programmes d’aide et de Management soutien à l’entrepreneuriat et aux PME 01OCPVN01 / Recrutement d'un consultant pour faire le diagnostic de la chaine de Supporting Private Sector Quality And Cost- Under IDA / 60620 Post Open - National 141,667.00 0.00 2020-12-15 2021-02-09 2021-01-05 2021-02-16 2021-02-18 2021-03-26 2021-03-18 2021-04-27 2021-04-17 2021-05-05 2021-05-22 2021-06-26 2021-12-23 valeur de la filière vivrière Development Based Selection Implementation dans les régions du Gbeke et de San Pedro Page 4 02OCPVN01 / Recrutement d'un consultant pour faire l'appui accompagnement (organisations et structuration, production et Supporting Private Sector Quality And Cost- Pending mise à marché, IDA / 60620 Post Open - National 541,667.00 0.00 2020-11-19 2020-12-10 2021-01-23 2021-02-20 2021-03-22 2021-04-26 2021-05-31 2021-11-27 Development Based Selection Implementation transformation, commercialisation) des operateurs de la filière vivrière dans les régions du Gbeke et de San Pedro 03OCPVN01 / Recrutement d'un consultant pour faire l'évaluation des activités Supporting Private Sector Quality And Cost- Pending IDA / 60620 Post Open - National 108,333.00 0.00 2020-12-15 2021-01-05 2021-02-18 2021-03-18 2021-04-17 2021-05-22 2021-06-26 2021-07-14 d'appui aux coopératives et Development Based Selection Implementation aux acteurs de la chaine de valeur vivrière 030SCCO1 / Recrutement d'un consultant pour la réalisation d’études APS et Enhancing the Performance Quality And Cost- IDA / 60620 Post Open - National 166,667.00 0.00 Canceled 2021-02-10 2021-02-04 2021-02-25 2021-03-26 2021-04-23 2021-05-08 2021-06-06 2021-07-11 2021-11-23 APD pour l’aménagement of Economic Infrastructure Based Selection d’une aire de repos dans la Commune de Bouaké. 031SCC01 / Recrutement d'un consultant pour la Consultant réalisation des études APS et Enhancing the Performance Under IDA / 60620 Post Qualification Open - National 166,667.00 0.00 2021-02-19 2021-02-16 2021-03-12 2021-02-17 2021-04-10 2021-04-25 2021-05-30 2021-10-12 APD pour l’aménagement of Economic Infrastructure Implementation Selection d’une aire de repos dans la Commune de Bouaké. 03SCOCPV03 / Recrutement d’un consultant pour le développement et el pilotage d'une plateforme digitale et Supporting Private Sector Quality And Cost- Under IDA / 60620 Post Open - National 1,000,000.00 0.00 2021-02-16 2021-02-16 2021-03-02 2021-02-17 2021-03-22 2021-04-21 2021-05-01 2021-05-29 2021-06-29 2022-08-23 d'une application hybride Development Based Selection Implementation pour permettre la mise en relation des agriculteurs avec les marchés potentiels 08SCPU02 / Recrutement d'un consultant pour l'étude d'état des lieux de l'écosystème entrepreneurial, Supporting Private Sector Quality Based IDA / 60620 Prior Open - International 5,000,000.00 0.00 Canceled 2018-08-29 2018-09-19 2018-09-14 2018-11-02 2019-07-19 2018-11-30 2019-05-22 2018-12-30 2019-09-06 2019-01-29 2019-03-05 2020-03-04 la conception et la mise en Development Selection œuvre d'un programme d'entrepreneuriat, et de son manuel d'exécution à Bouaké et San Pedro 0115SCFGPME03 / Recrutement d'un cabinet Improving Institutions, fournir une expertise dans la Least Cost Under IDA / 60620 Regulations and Urban Post Open - National 125,000.00 0.00 2021-04-27 2021-04-15 2021-04-27 2021-05-11 2021-06-08 2021-06-23 2021-07-28 2021-09-01 2021-11-20 transformation du Fonds de Selection Implementation Management Garantie de crédits aux PME et son opérationnalisation. CI-PIDUCAS-231494-CS-CQS / Recrutement d'un consultant Improving Institutions, Consultant Under ou ONG pour le suivi de la IDA / 60620 Regulations and Urban Post Qualification Open - National 275,000.00 0.00 2021-05-11 2021-05-10 2021-06-01 2021-06-08 2021-07-15 2021-08-14 2021-09-18 2021-10-08 Implementation mise en œuvre de Management Selection l'Engagement citoyen 0114SCEC03 / Recrutement Improving Institutions, d'un Consultant ou ONG pour Quality And Cost- IDA / 60620 Regulations and Urban Post Open - National 275,000.00 0.00 Canceled 2021-04-20 2021-04-15 2021-05-04 2021-06-07 2021-07-05 2021-07-20 2021-08-18 2021-09-22 2022-06-19 le suivi de la mise en œuvre Based Selection Management de l'Engagement citoyen CI-PIDUCAS-238288-CS-QBS / Recrutement d’un consultant pour la mise en Improving Institutions, Quality Based Pending place d’un mécanisme de IDA / 60620 Regulations and Urban Post Open - National 83.33 0.00 2021-06-15 2021-07-06 2021-08-04 2021-09-01 2021-09-16 2021-10-16 2021-10-31 2022-01-29 Selection Implementation collecte et de mise à jour des Management programmes d’aide et de soutien à l’entrepreneuriat et aux PME INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 22SCPU01 / Recrutement d'un consultant individuel pour une assistance technique Individual Pending à la Cellule de Coordination IDA / 60620 Project Management Post Consultant Limited 100,000.00 0.00 2018-05-15 2018-05-25 2018-06-04 2018-06-24 2018-12-21 Implementation du PIDUCAS pour la Selection préparation des études de la composante 3 du projet CI-PIDUCAS-71729-CS-CDS / Etude du nouveau design Enhancing the Performance sur la traversée Sud-Nord de IDA / 60620 Prior Direct Selection Direct 143,118.00 0.00 Under Review 2018-07-31 2018-09-14 2018-08-10 2018-10-14 2019-04-12 of Economic Infrastructure la ville de Bouaké par la route A3- Etudes complémentaires 09SCPU02 / Recrutement d'un consultant pour le renforcement des capacités des structures d'appui au PME Individual Supporting Private Sector Pending et du Ministère en charge de IDA / 60620 Post Consultant Open 77,400.00 0.00 2018-04-25 2018-05-24 2018-06-03 2018-06-18 2018-12-15 Development Implementation l'entrepreneuriat ainsi qu'une Selection assistance technique pour la mise œuvre du programme d'entrepreneuriat CI-PIDUCAS-87192-CS-CDS / Etudes géotechniques de mesures de déflexions, de relevés de dégradations et de Enhancing the Performance Pending sondages sous-chaussée pour IDA / 60620 Post Direct Selection Direct 16,286.65 0.00 2018-11-19 2018-11-29 2019-02-02 2019-08-01 of Economic Infrastructure Implementation la traversée A3 et une étude des plateformes et dalot de deux barreaux d'environ de 2km dans la ville de Bouaké Page 5 CI-PIDUCAS-87193-CS-CDS / Etudes techniques détaillées d'APS, APD et l'élaboration de DAO de travaux d'aménagement du nouveau Enhancing the Performance Pending IDA / 60620 Post Direct Selection Direct 87,785.00 0.00 2018-11-28 2018-12-08 2019-02-11 2019-08-10 design la traversée Sud-Nord of Economic Infrastructure Implementation de la ville de Bouaké par la A3 et de 2 Km environ de voiries Urbaines de voies de décongestion de la A3 14SCPU01 / Recrutement Improving Institutions, Individual d'un consultant Individuel Pending IDA / 60620 Regulations and Urban Post Consultant Limited 80,579.87 0.00 2018-03-12 2018-03-17 2018-03-22 2018-04-06 2018-10-03 pour l'aménagement paysager Implementation Management Selection et jardins publics de Bouaké 013SCPU03 / Recrutement Improving Institutions, Individual d'un consultant pour Pending IDA / 60620 Regulations and Urban Post Consultant Limited 75,000.00 0.00 2018-03-05 2018-03-10 2018-03-15 2018-03-30 2018-04-29 l'aménagement paysager et Implementation Management Selection jardins publics de San Pedro 18SCPU03 / Constat d'impact environnemental et social Improving Institutions, Individual (CIES) + PAR pour Pending IDA / 60620 Regulations and Urban Post Consultant Limited 71,000.00 0.00 2018-03-13 2018-03-18 2018-03-28 2018-04-17 2018-07-16 l'aménagement du centre de Implementation Management Selection traitement de déchets à BOUAKE 04SCPU01 / Recrutement d'une Firme pour l'étude de définition d'aménagements fonctionnels de 11 principaux carrefours sur la traversée sud- Enhancing the Performance Pending IDA / 60620 Post Direct Selection Direct 63,000.00 0.00 2018-04-10 2018-04-20 2018-06-24 2018-12-21 nord de la ville de Bké par la of Economic Infrastructure Implementation route A3 et d'identification d'itinéraires de contournement de cette voie en phase de travaux CI-PIDUCAS-109148-CS-CDS / Contrat avec le Groupement ALL NEXT/TERRABO Improving Institutions, Pending Ingenieurs Conseils, pour IDA / 60620 Regulations and Urban Post Direct Selection Direct 183,620.26 0.00 2019-04-08 2019-04-18 2019-06-22 2019-12-19 Implementation l'etude de faisabilité de Management l'adressage des ville de Bouaké et San Pedro CI-PIDUCAS-91298-CS-CDS / Contrat avec TRANSITEC Enhancing the Performance Pending pour le nouveau design sur la IDA / 60620 Post Direct Selection Direct 143,118.00 0.00 2018-12-13 2018-12-23 2019-02-26 2019-08-25 of Economic Infrastructure Implementation traversée Sud Nord par la A3 de la ville de Bouaké CI-PIDUCAS-109158-CS- INDV / Recrutement d'un Individual consultant individuel pour Enhancing the Performance Pending IDA / 60620 Post Consultant Limited 90,000.00 0.00 2019-04-24 2019-04-29 2019-05-20 2019-06-24 2019-12-21 l'actualisation du PAR de of Economic Infrastructure Implementation Selection l'aménagement de la traversée de la ville de Bouaké par la A3 Individual 001SC2000 / Recrutement Pending IDA / 60620 Project Management Post Consultant Direct 125,000.00 0.00 2020-01-08 2020-01-18 2020-02-01 2020-02-11 2022-07-30 d'expert en suivi et évaluation Implementation Selection 03OCPV01 / Recrutement d’un consultant pour la réalisation d’une étude pour Individual déterminer la structure des Supporting Private Sector IDA / 60620 Post Consultant Open 63,333.00 0.00 Canceled 2020-03-19 2020-04-22 2020-05-07 2020-05-17 2020-08-15 coûts en rapport avec les Development Selection acteurs de la chaine de commercialisation des produits vivriers. CI-PIDUCAS-166205-CS-CDS / Recrutement d’un cabinet Enhancing the Performance Under pour proposer une solution IDA / 60620 Post Direct Selection Direct 20,000.00 0.00 2020-04-01 2020-06-12 2020-04-11 2020-05-03 2020-06-02 of Economic Infrastructure Implementation durable d’assainissement des capitaux propres de la SEMGB CI-PIDUCAS-186093-CS- INDV / Recrutement d’un consultant chargé d’appuyer Individual et de former les Directions Supporting Private Sector Under IDA / 60620 Post Consultant Limited 10,500.00 0.00 2020-08-17 2020-08-19 2020-08-22 2020-09-12 2020-10-17 2020-12-16 Techniques du Ministère de la Development Implementation Selection promotion des PME à l’élaboration des termes de références 04OCPVN01 / Recrutement d'un consultant pour Individual Supporting Private Sector Pending déterminer la structure des IDA / 60620 Post Consultant Limited 83,333.00 0.00 2020-11-25 2020-11-30 2020-12-21 2021-01-25 2021-04-25 Development Implementation couts de la chaine des valeurs Selection vivrières 030SCHV01 / Recrutement Improving Institutions, Individual d'un consultant pour la Under IDA / 60620 Regulations and Urban Post Consultant Limited 33,333.00 0.00 2021-01-27 2021-01-22 2021-02-01 2021-02-15 2021-03-15 2021-04-09 réalisation de l’Audit de Implementation Management Selection l’Hôtel de ville de Bouaké 001SCAPSP03 / RECRUTEMENT D'UN CONSULTANT POUR LA REALISATION D’ÉTUDES TECHNIQUES ET Improving Institutions, Individual Under ARCHITECTURALES IDA / 60620 Regulations and Urban Post Consultant Limited 83,333.00 0.00 2021-02-10 2021-02-04 2021-02-15 2021-02-15 2021-03-08 2021-04-12 2021-07-16 Implementation COMPLETES (APS ET APD) DES Management Selection SOUS-PROJETS D’AMENAGEMENT PAYSAGER DANS LA COMMUNE DE SAN- PEDRO Page 6 02SCAPBK03 / RECRUTEMENT D'UN CONSULTANT INDIVIDULE POUR LA REALISATION DE LA MISSION D’ÉTUDES TECHNIQUES ET Improving Institutions, Individual ARCHITECTURALES IDA / 60620 Regulations and Urban Post Consultant Limited 83,333.00 0.00 Under Review 2021-02-10 2021-02-04 2021-02-15 2021-03-08 2021-04-12 2021-07-16 COMPLETES (APS ET APD) DES Management Selection SOUS-PROJETS D’AMENAGEMENT PAYSAGER DANS LA COMMUNE DE BOUAKE : 0111SCC01PAR / Recrutement d'un consultant pour l'élaboration du PAR des Individual Enhancing the Performance Under personnes affectées par le IDA / 60620 Post Consultant Limited 16,667.00 0.00 2021-04-27 2021-04-15 2021-05-02 2021-05-23 2021-06-16 2021-07-07 of Economic Infrastructure Implementation projet d'aménagement des Selection barreaux de la traversée de Bouaké par la route A3 0113SCC01CIES / Recrutement d'un consultant Individual Enhancing the Performance Under pour faire l'étude de (CIES) du IDA / 60620 Post Consultant Limited 41,667.00 0.00 2021-04-27 2021-05-11 2021-05-02 2021-05-23 2021-06-16 2021-09-14 of Economic Infrastructure Implementation sous-projet de l'aire de Selection stationnement de San Pedro. 0112SCC01MGB01 / Recruter d'un consultant individuel Individual pour faire les Etudes Enhancing the Performance Under IDA / 60620 Post Consultant Limited 83,333.00 0.00 2021-04-27 2021-04-19 2021-05-02 2021-05-23 2021-06-16 2021-08-18 techniques préparatoires et of Economic Infrastructure Implementation Selection architecturales (APS, APD) des travaux au sein du MGB CI-PIDUCAS-237052-CS-CDS / Mise en œuvre du Supporting Private Sector Under IDA / 60620 Post Direct Selection Direct 1,663,786.00 0.00 2021-06-15 2021-06-03 2021-06-25 2021-08-03 2021-12-31 programme de Development Implementation l'entrepreneuriat Page 7 PROCUREMENT PLAN (Textual Part) Project information: Country: Afghanistan Project name: Afghanistan: Strengthening Afghanistan’s Financial Intermediation Project ID: P171886 Project Implementation agency: DA Afghanistan Bank Date of the Procurement Plan: August 2020 Period covered by this Procurement Plan: 18 Months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised in 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the procurement documents agreed by the bank shall be used. When the Project uses its own national open competitive procurement arrangements as set forth in the Procurement Law of the Islamic Republic of Afghanistan dated 27/06/13965 (September 17, 2016) published in the Official Gazette No.1223, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following NPP Conditions for Afghanistan: I. Only the model bidding documents acceptable to the World Bank shall be used for all national open competitive procurement. II. The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; III. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. IV. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts V. There shall be no negotiations of contract price at post contract stage or termination of the contract - on grounds of operation of Price Adjustment stipulated in a signed contract exceeding a specified percentage. VI. No preference of any kind shall be given to national bidders in the bidding process. . Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; NA Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; NA Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. “As of now Not Applicable” Other Relevant Procurement Information. Nil. PROCUREMENT Afghanistan : Strengthening Afghanistan’s Financial Intermediation PLAN General Information Country: Afghanistan Bank’s Approval Date of the Original Procurement Plan: 2020-08-12 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171886 GPN Date: Project Name: Strengthening Afghanistan’s Financial Intermediation Loan / Credit No: IDA / D7230, / Da Afghanistan Bank Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SAFI/G1 / Infrastructure Replacement and Upgrade Pending Component 4: Enhancing Single Stage - One design for Public Credit IDA / D7230 Post Request for Bids Open - International 0.00 Implementati 2021-06-22 2021-06-27 2021-08-08 2021-09-07 2021-10-12 2022-04-10 DAB’s IT Infrastructure Envelope Registry’s (PCR) Hardware and on Software NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SAFI/C3 / Development of Component 4: Enhancing Quality And Cost- Pending Far Disaster Recovery Site IDA / D7230 Prior Open - International 0.00 2021-06-22 2021-07-13 2021-08-26 2021-09-23 2021-10-23 2021-11-27 2022-01-01 2023-01-01 DAB’s IT Infrastructure Based Selection Implementation (DR)for Public Credit Registry (PCR) SAFI/C4 / Strengthening Component 5: Strengthening Internal Audit& Adoption of Quality And Cost- Pending IDA / D7230 DAB’s Regulatory and Prior Open - International 0.00 2021-06-23 2021-07-14 2021-08-27 2021-09-24 2021-10-24 2021-11-28 2022-01-02 2023-01-02 Risk-based Internal Audit at Based Selection Implementation Supervisory Capacity DAB Component 5: Strengthening SAFI/C5 / Acquisition of Quality And Cost- Pending IDA / D7230 DAB’s Regulatory and Post Open - International 0.00 2021-06-23 2021-07-14 2021-08-27 2021-09-24 2021-10-24 2021-11-28 2022-01-02 2023-01-02 Forensic Audit Skills Based Selection Implementation Supervisory Capacity SAFI/C6 / IT and Systems Component 5: Strengthening Quality And Cost- Pending Examination Systems Section IDA / D7230 DAB’s Regulatory and Post Open - International 0.00 2021-06-23 2021-07-14 2021-08-27 2021-09-24 2021-10-24 2021-11-28 2022-01-02 2023-01-02 Based Selection Implementation Training Supervisory Capacity SAFI/ C4 / Strenghthening of Quality And Cost- DAB Internal Audit & Adoption / Post Open - International 0.00 Canceled 2020-03-15 2020-03-20 2020-04-03 2020-05-01 2020-05-31 2020-07-05 2020-08-09 2021-08-09 Based Selection of Risk Based Audit (RBIA) SAFI/C9 / Audit of four Quality And Cost- commercial banks in / Post Open - International 0.00 Canceled 2020-03-15 2020-04-05 2020-05-19 2020-06-16 2020-07-16 2020-08-20 2020-09-24 2021-03-23 Based Selection Afghanistan SAFI/C2 / Enhancement of Public Credit Registry (PCR) with Utilities and Telecoms Component 4: Enhancing Quality And Cost- Pending IDA / D7230 Prior Open - International 0.00 2021-06-29 2021-07-20 2021-09-02 2021-09-30 2021-10-30 2021-12-04 2022-01-08 2023-01-08 modules for the development DAB’s IT Infrastructure Based Selection Implementation of Public Credit Registry – Phase II INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SAFI/C7 / AML(Anti-Money Laundering System) Component 5: Strengthening Pending Implementation, IDA / D7230 DAB’s Regulatory and Post Direct Selection Direct 0.00 2021-06-23 2021-07-03 2021-09-06 2022-03-05 Implementation Customization, and Supervisory Capacity Configuration Component 5: Strengthening SAFI/C8 / Screening Pending IDA / D7230 DAB’s Regulatory and Post Direct Selection Direct 0.00 2021-06-23 2021-07-03 2021-09-06 2022-03-05 Automation Implementation Supervisory Capacity SAFI/C1 / Extension of PCR Contract and New Modules Component 4: Enhancing Pending IDA / D7230 Prior Direct Selection Direct 0.00 2021-06-16 2021-06-26 2021-08-30 2022-02-26 (Benchmarking & Billing for DAB’s IT Infrastructure Implementation PCR System) Page 1 PROCUREMENT PLAN (Textual Part) Project information: Jordan Education Reform Support Program- P162407 Project Implementation agency: Jordan Ministry of Education Date of the Procurement Plan: 27-Mar-2018 Period covered by this Procurement Plan: Project life Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in bylaw No 32 (1993) for purchase of Goods and consultancies, and bylaw No 71 (1986) for procurement of works and related consulting services, and all subsequent amendments to those bylaws, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is applicable for those contracts identified in the Procurement Plan tables]; Works: [is applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. Table 1- Procurement methods and prior review thresholds Market approach Shortlist composed Goods, IT and non-consulting Works only of national services consultants Internati Engineer Nationa onal and ing & Open l Open Consulti Open Open national Construc internati internatio ng national national tion onal (shoppi nal (shoppin services supervisi ng) g) on US$ US$ US$ US$ US$ US$ US$ US$ Method ≥10,000,0 <10,000, ≤200,00 ≥1,000,00 < 1,000, < 300,00 ≤100,000 ≤500,000 Thresholds 00 000 0 0 000 0 All Proc. Method RFB RFB RFQ RFB RFB RFQ QCBS methods Proc prior Firms >2,000,000 >15,000,000 >4,000,000 review Ind. >400,000 PROCUREMENT Jordan : Jordan Education Reform Support Program PLAN General Information Country: Jordan Bank’s Approval Date of the Original Procurement Plan: 2018-03-27 2021-05-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162407 GPN Date: Project Name: Jordan Education Reform Support Program Loan / Credit No: IBRD / 88040, TF / A6421, TF / A6420 Ministry of Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JO-MOE-56061-CS-LCS / Verification firm that will be verifying the achievement of Least Cost IBRD / 88040 Implementation Support Post Open - International 200,000.00 0.00 Canceled 2018-03-27 2018-04-17 2018-05-31 2018-06-28 2018-07-28 2018-09-01 2018-10-06 2019-04-04 the DLR AND ALSO Follow on Selection the Project Action Plan activities and indicators. JO-MOE-67027-CS-QCBS / Conducting a needs assessment for socioemotional learning Quality And Cost- Under programs as part of the TF / A6421 Implementation Support Post Open - International 150,000.00 0.00 2018-06-18 2018-06-20 2018-07-09 2018-09-26 2018-08-02 2018-10-08 2018-08-30 2018-11-05 2018-09-06 2019-11-12 2018-09-27 2018-12-03 2018-10-25 2019-02-21 Based Selection Implementation efforts to improve school climate by designing a national socioemotional learning program JO-MOE-67031-CS-QCBS / Expanding access to KGs Quality And Cost- Under through the design of PPP TF / A6421 Implementation Support Post Open - International 500,000.00 0.00 2018-06-18 2018-07-09 2018-08-02 2018-08-30 2018-09-06 2018-09-27 2018-10-25 2019-04-18 Based Selection Implementation setup and development of plan for rollout JO-MOE-67033-CS-QCBS / Quality And Cost- Pending Improving teaching practices TF / A6421 Implementation Support Post Open - International 750,000.00 0.00 2018-06-18 2018-07-09 2018-08-02 2018-08-30 2018-09-06 2018-09-27 2018-10-25 2019-04-25 Based Selection Implementation in KG classrooms JO-MOE-67034-CS-QCBS / Development of a quality Quality And Cost- Under TF / A6421 Implementation Support Post Open - International 500,000.00 0.00 2018-06-18 2018-07-06 2018-07-09 2018-09-26 2018-08-02 2018-08-20 2018-08-30 2018-09-17 2018-09-06 2018-09-24 2018-09-27 2018-10-15 2018-10-25 2019-02-21 assurance system for public Based Selection Implementation and private KG providers JO-MOE-67035-CS-QCBS / Design of teachers' Quality And Cost- Under TF / A6420 Implementation Support Post Open - International 120,000.00 0.00 2018-06-18 2018-07-06 2018-07-09 2018-09-26 2018-08-02 2018-12-24 2018-08-30 2019-01-21 2018-09-06 2019-01-28 2018-09-27 2019-05-18 2018-10-25 2019-04-25 development policy and Based Selection Implementation strategy framework JO-MOE-79539-CS-QCBS / Quality And Cost- Under Independent Verification IBRD / 88040 Implementation Support Post Open - International 200,000.00 0.00 2018-09-26 2018-09-26 2018-10-11 2018-09-26 2018-10-26 2018-10-26 2018-11-25 2018-11-25 2018-12-15 2018-12-16 2018-12-30 2018-12-31 2019-01-14 2020-01-14 Based Selection Implementation Agency JO-MOE-89221-CS-QCBS / The objective of the consultancy is to conduct a comprehensive assessment of the feasibility and relevance of Quality And Cost- Under IBRD / 88040 Implementation Support Post Open - International 500,000.00 0.00 2018-12-04 2018-12-04 2018-12-19 2019-01-07 2019-01-08 2019-03-31 2019-01-29 2019-04-21 2019-02-13 2019-05-06 2019-02-28 2019-05-22 2019-04-04 2019-10-01 different policy options to Based Selection Implementation help MOE increase KG2 Enrollment rate from 59 to 80 percent by 2022 and up to 100 percent by 2025. JO-MOE-67039-CS-QCBS / Independent Verification Quality And Cost- Pending TF / A6421 Implementation Support Post Open - International 40,339.00 0.00 2020-08-20 2020-09-10 2020-10-24 2020-11-21 2020-12-21 2021-01-25 2021-03-01 2022-03-01 Agency for the Education Based Selection Implementation Reform Support Program JO-MOE-67040-CS-QCBS / Quality And Cost- Under Develop a National Student TF / A6421 Implementation Support Post Open - National 250,000.00 0.00 2021-02-15 2021-03-07 2021-03-08 2021-03-29 2021-04-01 2021-04-21 2021-04-28 2021-05-18 2021-05-30 2022-03-31 Based Selection Implementation Assessment Strategy JO-MOE-67041-CS-QCBS / Quality And Cost- Under Develop a Blended Learning TF / A6421 Implementation Support Post Open - International 250,000.00 0.00 2021-04-18 2021-05-16 2021-05-02 2021-05-30 2021-06-06 2021-06-13 2021-06-30 2021-07-14 2021-08-04 2022-04-01 Based Selection Implementation Strategy JO-MOE-67042-CS-QCBS / Quality And Cost- Pending PforR Consultant for MOE- TF / A6421 Implementation Support Post Open - International 300,000.00 0.00 2021-06-06 2021-06-27 2021-08-07 2021-08-12 2021-09-02 2021-09-30 2021-11-04 2022-11-04 Based Selection Implementation Jordan Page 1 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual JO-MOE-79641-CS-INDV / Under TF / A6421 Implementation Support Post Consultant Limited 25,000.00 0.00 2018-09-26 2018-10-01 2018-10-22 2018-11-26 2019-11-25 Financial Management Officer Implementation Selection Individual JO-MOE-79645-CS-INDV / Under TF / A6421 Implementation Support Post Consultant Open 25,000.00 0.00 2018-10-01 2018-11-19 2018-12-10 2019-01-14 2020-01-13 Procurement Officer Implementation Selection JO-MOE-98541-CS-INDV / Providing technical and Individual administrative support to the Pending IBRD / 88040 Implementation Support Post Consultant Open 40,000.00 0.00 2019-02-20 2019-04-10 2019-05-01 2019-06-05 2019-12-02 Managing Directorate of Implementation Selection Educational Supervision and Training. JO-MOE-105699-CS-INDV / Individual Pending Monitoring and Evaluation IBRD / 88040 Implementation Support Post Consultant Open 25,000.00 0.00 2019-03-12 2019-04-30 2019-05-21 2019-06-25 2019-12-22 Implementation Expert Selection JO-MOE-67025-CS-CDS / Providing Opportunities with Under TF / A6421 Implementation Support Post Direct Selection Direct 81,458.94 0.00 2020-03-05 2021-04-11 2020-03-10 2020-05-14 2020-11-10 Education - Data Collection Implementation Firm JO-MOE-67026-CS-CDS / Providing Opportunities with Under TF / A6421 Implementation Support Post Direct Selection Direct 240,000.00 0.00 2020-08-09 2021-01-05 2020-08-14 2020-09-28 2020-12-27 Education for Students in Implementation Jordan - Teacher Training Firm Page 2 5764- BF Projet de Gouvernance Economique et de Participation Citoyenne (PGEPC) Plan de Passation de marchés I. Généralités 1. Date d’approbation du Plan de passation de marchés par la Banque [original] : Juillet 2015 ; Révision : Août 2017 3. Date de notification du Plan Général de Passation de marchés : 06 janvier 2017 4. Période couverte par le Plan de Passation de marchés : 2017- 2018 II. Biens et Services autres que services de consultants : 1. Seuil de Revue préalable: Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans l'Annexe 1 des Directives de passation de marchés : Méthode de Passation de Seuil de revue à priori Commentaires marchés 1. AOI ≥ 2 000 000 USD Tout contrat d’un coût 2. AON < 1 000.000 USD estimatif ≥ à 2.000.000 3. Consultation de Fournisseurs < 100 000 USD USD, indépendamment 4. Entente directe Sans seuil du mode de passation 2. Pré-qualification : Non Applicable 3. Procédures proposées pour les composantes CDD : Non Applicable 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Manuel de Procédures de Gestion Financière et Comptable du PGEPC 5. Tout autre arrangement spécial en passation de marchés : Non Applicable 6. Allotissement de fournitures avec méthodes et calendrier : 1 2 3 4 5 6 7 8 Réf. Description t Coût estimatif Allotisseme Méthod Préférenc Revue de Commentaires No USD nt e de e la Banque sélectio nationale (à priori / n Oui / Non à posteriori) 1 Résumé des contrats de fournitures 2,574,000 9 AON NON Post III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans l'Annexe 1 des Directives Sélection et Emploi de consultants : Méthode de sélection Seuil de Commentaires revue à priori en USD 1. Méthode compétitive (firmes) : ≥ 1,000,000 Tout contrat dont la valeur SFQC ; SFQ ; QC ; SCBD ; SMC, SED estimative est supérieure ou égale à 1,000,000 USD indépendamment du mode de sélection 2. Services de Consultant Individuel : ≥ 300, 000 Tout contrat de valeur comparaison d’au moins 3 CVs ; SED estimative supérieure ou égale à 300,000 indépendamment du mode de sélection 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de $ 200 000 par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 2.7 des directives de sélection de consultants. 3. Tout autre arrangement spécial de Sélection de consultants : Non applicable 4. Tâches de consultation avec des méthodes de sélection et calendrier : 1 2 3 4 5 6 7 Réf. Description des missions Coût Méthod Alloti Revue de Commentai No. estimatif e de ssem la res (USD) sélectio ent Banque n (à priori / à posterior i) Résumé des contrats selon la 1,634, 800 3 Post méthode QCBS QCBS Résumé des contrats selon 2,718, 000 Autres 33 Post d’autres méthodes PROCUREMENT Burkina Faso : Burkina Faso Economic Governance, GovTech and Citizen Engagement Project PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2017-09-20 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155121 GPN Date: Project Name: Burkina Faso Economic Governance, GovTech and Citizen Engagement Project Loan / Credit No: IDA / 57640 Economic Governance and Citizen Engagement Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PGEPC-15199-GO-RFB / Strengthening Citizen Pending Single Stage - One Matériels informatiques des IDA / 57640 Engagement and Post Request for Bids Open - National 100,000.00 0.00 Implementati 2017-05-30 2017-05-30 2017-05-30 2017-05-30 2017-06-20 2017-09-18 Envelope DMPs Accountability on BF-PGEPC-15249-GO-RFQ / Strengthening Citizen Pending Request for Single Stage - One Rayonnages et mobiliers IDA / 57640 Engagement and Post Limited 66,000.00 0.00 Implementati 2017-04-26 2017-06-21 2017-08-20 Quotations Envelope DMP/MI Accountability on BF-PGEPC-15464-GO-RFB / Strengthening Citizen Pending Single Stage - One Equipement pour le DATA IDA / 57640 Engagement and Post Request for Bids Open - National 400,000.00 0.00 Implementati 2017-05-26 2017-05-31 2017-07-12 2017-08-11 2017-09-15 2017-11-14 Envelope CENTER Accountability on Strengthening Citizen Under BF-PGEPC-15193-GO-RFB / Single Stage - One IDA / 57640 Engagement and Post Request for Bids Open - National 840,000.00 0.00 Implementati 2017-05-31 2017-04-17 2017-06-05 2017-07-17 2017-05-29 2017-08-16 2017-09-20 2017-12-19 Equipement RESINA Envelope Accountability on BF-PGEPC-15465-GO-RFQ / Pending Request for Single Stage - One Véhicules à quatre roues et à IDA / 57640 Project Management Support Post Limited 83,000.00 0.00 Implementati 2017-03-28 2017-05-23 2017-07-07 Quotations Envelope deux roues on Pending BF-PGEPC-15252-GO-RFQ / Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 30,000.00 0.00 Implementati 2017-04-05 2017-05-31 2018-05-26 Fournitures de bureau Quotations Envelope on Pending BF-PGEPC-14580-GO-RFQ / Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 29,400.00 0.00 Implementati 2016-12-04 2017-01-29 2017-02-28 Mobiliers de bureau de l'UCP Quotations Envelope on BF-PGEPC-15208-GO-RFQ / Pending Request for Single Stage - One Equipement informatique de IDA / 57640 Project Management Support Post Limited 41,600.00 0.00 Implementati 2016-12-04 2017-01-29 2017-02-28 Quotations Envelope l'UCP on BF-PGEPC-15196-GO-RFQ / Pending Request for Single Stage - One Consommables informatiques IDA / 57640 Project Management Support Post Open - National 10,000.00 0.00 Implementati 2016-12-11 2017-02-05 2017-02-12 Quotations Envelope et de reprographie on BF-PGEPC-15258-GO-RFQ / Pending Request for Single Stage - One Rideaux et stores des bureaux IDA / 57640 Project Management Support Post Limited 20,000.00 0.00 Implementati 2017-01-14 2017-03-11 2017-09-07 Quotations Envelope de l'UCP on BF-PGEPC-15257-GO-RFQ / Pending Request for Single Stage - One Autocoms et postes IDA / 57640 Project Management Support Post Limited 9,000.00 0.00 Implementati 2017-01-14 2017-03-11 2017-04-10 Quotations Envelope téléphoniques individuels on BF-PGEPC-15209-GO-RFQ / Pending Request for Single Stage - One Logiciel de gestion financière IDA / 57640 Project Management Support Post Limited 40,000.00 0.00 Implementati 2016-12-11 2017-02-05 2017-04-06 Quotations Envelope et comptable on BF-PGEPC-30391-GO-RFB / Matériels informatiques et Improving domestic revenue Pending Single Stage - One mobiliers de bureau de la IDA / 57640 mobilization and public Post Request for Bids Open - National 434,000.00 0.00 Implementati 2017-05-18 2017-05-23 2017-07-04 2017-08-03 2017-09-07 2018-03-06 Envelope DGB, DGTCP, AJB, ASCE-LC, expenditure management on RENLAC, CNOSC, IGF, MJ Improving domestic revenue Under BF-PGEPC-30395-GO-DIR / IDA / 57640 mobilization and public Post Direct Selection Direct 350,000.00 0.00 Implementati 2017-07-31 2017-08-05 2017-09-09 2018-03-08 Logiciel SYGADE 6,0 expenditure management on BF-PGEPC-45379-GO-RFB / Edition du budget citoyen de Strengthening Citizen Pending l'Etat, du rapport sur la Request for Single Stage - One IDA / 57640 Engagement and Post Limited 30,000.00 0.00 Implementati 2017-12-20 2018-02-14 2018-08-13 transparence budgétaire et du Quotations Envelope Accountability on budget citoyen des cinq (05) régions pilotes BF-PGEPC-45371-GO-RFB / Pending Réalisation de parkings pour Single Stage - One IDA / 57640 Project Management Support Post Request for Bids Limited 9,500.00 0.00 Implementati 2017-05-20 2017-05-25 2017-07-06 2017-08-05 2017-09-09 2018-03-08 véhicules à quatre (04) au Envelope on profit de l'UCP Strengthening Citizen BF-PGEPC-14252-GO-RFB / Single Stage - One IDA / 57640 Engagement and Post Request for Bids Open - National 80,000.00 0.00 Canceled 2017-09-12 2017-09-17 2017-10-29 2017-11-28 2018-01-02 2018-04-02 Edition de divers documents Envelope Accountability BF-PGEPC-48697-GO-RFQ / Acquisition de matériels spécifiques, de matériels de Strengthening Citizen sonorisation et divers autres Request for Single Stage - One IDA / 57640 Engagement and Post Limited 24,840.00 21,424.92 Signed 2018-04-25 2018-05-08 2018-06-20 2018-06-14 2018-07-30 matériels au profit de l’AJB et Quotations Envelope Accountability pour le fonctionnement des CEC du MENA/MS et du RENLAC Page 1 BF-PGEPC-48711-GO-DIR / Improving domestic revenue Edition du Code général des IDA / 57640 mobilization and public Post Direct Selection Direct 100,000.00 89,022.50 Completed 2018-02-28 2018-02-12 2018-03-05 2018-02-16 2018-04-09 2018-04-06 2018-05-11 2018-06-28 impôts au profit de la DGI expenditure management BF-PGEPC-48678-GO-RFB / Equipements informatiques au profit de la Under Single Stage - Two DMP/DCMEF/DGCOOP/ et de IDA / 57640 Rapid Response Facility Post Request for Bids Open - National 131,700.00 0.00 Implementati 2018-04-02 2018-05-02 2018-04-07 2018-05-19 2018-07-06 2018-08-01 2018-07-11 2018-09-05 2019-03-04 Envelope la DGTCP dans le cadre de on l’installation du logiciel SYGADE 6.0 BF-PGEPC-48723-GO-RFQ / Equipements en mobiliers de Request for Single Stage - One bureau au profit de la IDA / 57640 Rapid Response Facility Post Limited 65,300.00 56,510.05 Signed 2018-05-20 2018-05-08 2018-07-15 2018-06-29 2018-09-25 Quotations Envelope DMP/DCMEF/DGCOOP et du RENLAC BF-PGEPC-48682-GO-RFQ / Pending Acquisition de divers autres Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 5,000.00 0.00 Implementati 2018-03-15 2018-05-10 2018-06-20 matériels informatique et Quotations Envelope on mobilier au profit de l’UCP BF-PGEPC-48739-GO-RFQ / Pending Fournitures de bureau et Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 30,000.00 0.00 Implementati 2018-03-05 2018-04-30 2018-10-27 consommables pour le Quotations Envelope on fonctionnement l’UCP BF-PGEPC-48742-GO-RFQ / Assurance santé du personnel Pending de l’UCP, assurance des Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 30,000.00 0.00 Implementati 2018-03-10 2018-05-05 2018-11-01 véhicules , des Quotations Envelope on équipementsinformatiques et de bureau BF-PGEPC-48726-GO-RFQ / Maintenance du matériel Pending Request for Single Stage - One informatique du cablage IDA / 57640 Project Management Support Post Limited 13,000.00 0.00 Implementati 2018-03-30 2018-05-25 2018-11-21 Quotations Envelope réseau, des climatiseurs et de on véhicules BF-PGEPC-48714-GO-RFQ / Pending Request for Single Stage - One Reproduction des supports de IDA / 57640 Project Management Support Post Limited 4,000.00 0.00 Implementati 2018-07-20 2018-09-14 2018-10-15 Quotations Envelope communication sur le projet on BF-PGEPC-48729-GO-DIR / Pending Acquisition de carburant pour IDA / 57640 Project Management Support Post Direct Selection Direct 12,000.00 0.00 Implementati 2018-03-10 2018-03-15 2018-04-19 2018-10-16 le fonctionnement de l'UCP on BF-PGEPC-50203-GO-RFQ / Edition du budget citoyen Strengthening Citizen Pending Request for Single Stage - One 2018 et du rapport d'analyse IDA / 57640 Engagement and Post Limited 23,000.00 0.00 Implementati 2018-11-06 2019-01-01 2019-06-30 Quotations Envelope budgétaire au profit de la DGB Accountability on e du CIFOEB BF-PGEPC-53093-GO-RFB / Improving domestic revenue Acquisition d'équipements et Single Stage - One IDA / 57640 mobilization and public Post Request for Bids Open - International 1,034,000.00 1,213,996.05 Signed 2018-05-04 2018-07-26 2018-05-09 2018-07-26 2018-06-20 2018-09-25 2018-07-20 2018-10-18 2018-08-24 2018-11-30 2018-12-24 d'outils pour sécuriser les Envelope expenditure management nœuds du RESINA BF-PGEPC-63379-GO-RFQ / Acquisition d'équipements et de consommables Improving domestic revenue Request for Single Stage - One informatiques dans le cadre IDA / 57640 mobilization and public Post Limited 80,000.00 70,105.26 Signed 2018-05-26 2018-05-18 2018-07-21 2018-06-14 2018-08-21 Quotations Envelope des activités préalables au expenditure management recensement fiscal 2018 au profit de la DGI BF-PGEPC-71193-GO-RFQ / Acquisition d'équipements pour la mise en place d'un Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 10,000.00 12,650.37 Signed 2018-09-15 2018-10-11 2018-11-10 2018-11-26 2019-12-11 système de stockage de Quotations Envelope données au profit de l'unité de coordination du PGEPC BF-PGEPC-80289-GO-RFQ / Acquisition de matériels Strengthening Citizen informatiques dans le cadre Request for Single Stage - One IDA / 57640 Engagement and Post Limited 90,000.00 77,586.79 Signed 2018-10-10 2018-10-11 2018-12-05 2018-11-09 2019-02-05 de l'opérationnalisation des Quotations Envelope Accountability Unités de Service à la Clientèle du MENA et MS BF-PGEPC-80290-GO-RFQ / Acquisition de mobiliers de Strengthening Citizen bureau dans le cadre de Request for Single Stage - One IDA / 57640 Engagement and Post Limited 80,000.00 51,667.41 Signed 2018-10-10 2018-10-15 2018-12-05 2018-11-21 2019-02-05 l'opérationnalisation des Quotations Envelope Accountability Unités de Service à la Clientèle (USC) du MENA et MS BF-PGEPC-48748-GO-DIR / Equipements pour les activités préalables au recensement fiscal 2018/Equipements Improving domestic revenue techniques et logiciels pour IDA / 57640 mobilization and public Post Direct Selection Direct 872,360.00 0.00 Canceled 2018-03-30 2018-04-04 2018-05-09 2018-11-05 les salles serveurs de la DGD expenditure management et l'ASCE-LC pour SYDONIA et de la mise en place de la plate forme de déclaration électronique de patrimoine BF-PGEPC-80539-GO-RFB / Fourniture, installation et mise en service d'équipements , de solutions Strengthening Citizen et de licences dans le cadre de Single Stage - One IDA / 57640 Engagement and Post Request for Bids Open - International 1,220,640.00 906,858.49 Signed 2018-10-05 2018-10-05 2018-10-10 2018-10-05 2018-11-21 2018-11-26 2018-12-14 2018-12-07 2019-01-18 2019-02-01 2019-04-18 la mise en place d'une Envelope Accountability plateforme de déclaration d'intérêt et de patrimoine au profit de l'ASCE-LC et de l'ouverture de SYDONIA WORLD sur internet. Page 2 BF-PGEPC-100221-GO-RFQ / Acquérir des équipements Strengthening Citizen informatiques au profit des Request for Single Stage - One IDA / 57640 Engagement and Post Limited 76,000.00 83,883.15 Signed 2019-05-05 2019-07-09 2019-06-30 2019-07-31 2019-08-30 pôles économiques et Quotations Envelope Accountability financiers du Ministère de la Justice BF-PGEPC-100239-GO-RFQ / Acquérir du mobilier de Strengthening Citizen Pending Request for Single Stage - One bureau au profit des pôles IDA / 57640 Engagement and Post Limited 22,000.00 0.00 Implementati 2019-05-05 2019-06-30 2019-08-30 Quotations Envelope économiques et financiers du Accountability on Ministère de la Justice BF-PGEPC-100224-GO-RFQ / Edition du rapport sur la Strengthening Citizen Pending transparence budgétaire, le Request for Single Stage - One IDA / 57640 Engagement and Post Limited 16,500.00 0.00 Implementati 2019-08-25 2019-10-20 2019-12-20 budget citoyen de 05 régions Quotations Envelope Accountability on et le rapport d'analyse budgétaire BF-PGEPC-100223-GO-RFQ / Acquérir des outils de test (gestion de la sécurité, Improving domestic revenue Pending Request for Single Stage - One gestion de la montée en IDA / 57640 mobilization and public Post Limited 23,600.00 0.00 Implementati 2019-05-26 2019-07-21 2019-09-20 Quotations Envelope charge des applications, expenditure management on gestion du dimensionnement des capacités) BF-PGEPC-100205-GO-RFQ / Acquérir des équipements pour l'interconnexion des Improving domestic revenue DMP/MI-MENA-MS au RESINA Request for Single Stage - One IDA / 57640 mobilization and public Post Limited 12,000.00 8,702.70 Signed 2019-02-23 2019-02-01 2019-04-20 2019-02-18 2019-05-06 dans le cadre de Quotations Envelope expenditure management l'opérationalisation du logiciel de suivi des délais de passation des MP BF-PGEPC-100227-GO-RFQ Pending / Acquérir des fournitures de Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 20,000.00 0.00 Implementati 2019-03-02 2019-04-27 2020-03-04 bureau et produits d'entretien Quotations Envelope on au profit de l'UCP BF-PGEPC-100240-GO-RFQ Pending / Acquérir des consommables Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 10,000.00 0.00 Implementati 2019-03-02 2019-04-27 2020-03-27 informatiques et de Quotations Envelope on reprographie BF-PGEPC-100125-GO-RFQ Pending / Entretien et maintenance Request for Single Stage - One IDA / 57640 Project Management Support Post Limited 10,000.00 0.00 Implementati 2019-03-05 2019-04-30 2019-10-27 des équipements informatique Quotations Envelope on et de bureau Pending BF-PGEPC-100207-GO-DIR / IDA / 57640 Project Management Support Post Direct Selection Direct 12,000.00 0.00 Implementati 2019-02-28 2019-03-05 2019-04-09 2019-05-09 Acquérir du carburant on BF-PGEPC-116567-GO-RFQ / Fourniture et pose de Improving domestic revenue mobiliers et de matériels dans Request for Single Stage - One IDA / 57640 mobilization and public Post Limited 24,000.00 20,271.72 Signed 2019-06-10 2019-10-15 2019-07-25 2019-12-10 2019-08-24 le cadre de l'aménagement de Quotations Envelope expenditure management la salle de développement au profit de la DGSI BF-PGEPC-116568-GO-RFQ / Acquisition et installation d'équipements réseaux et Improving domestic revenue Request for Single Stage - One énergie dans le cadre de IDA / 57640 mobilization and public Post Limited 99,000.00 77,615.33 Signed 2019-06-11 2019-10-15 2019-07-30 2019-12-05 2019-08-30 Quotations Envelope l'aménagement de la salle de expenditure management développement au profit de la DGSI BF-PGEPC-116569-GO-RFQ / Acquisition de divers Strengthening Citizen Request for Single Stage - One ouvrages au profit du Centre IDA / 57640 Engagement and Post Limited 20,000.00 14,136.34 Signed 2019-06-15 2019-11-21 2019-08-10 2019-12-16 2019-09-30 Quotations Envelope de Documentation et de Accountability Recherche du RENLAC BF-PGEPC-123770-GO-RFQ / Fourniture et pose de Strengthening Citizen matériels pour l'aménagement Request for Single Stage - One IDA / 57640 Engagement and Post Limited 100,000.00 54,207.57 Signed 2019-07-31 2019-07-16 2019-09-25 2019-09-09 2019-11-25 et la normalisation de deux Quotations Envelope Accountability (02) salles techniques au profit de l'ASCE-LC BF-PGEPC-123771-GO-RFQ Strengthening Citizen / Fourniture, installation et Request for Single Stage - One IDA / 57640 Engagement and Post Limited 100,000.00 30,663.14 Signed 2019-07-31 2019-07-19 2019-09-25 2019-09-06 2019-11-25 mise en service Quotations Envelope Accountability d'équipements réseau au profit de l'ASCE-LC BF-PGEPC-123784-GO-RFQ / Fourniture et mise en Strengthening Citizen service d'outils; de licences Request for Single Stage - One IDA / 57640 Engagement and Post Limited 100,000.00 117,990.58 Signed 2019-07-31 2019-07-19 2019-09-25 2019-09-06 2019-11-25 logicielles et durcissement de Quotations Envelope Accountability la sécurité de l'infrastructure globale au profit de l'ASCE-LC BF-PGEPC-124747-GO-RFQ Strengthening Citizen / Mise en œuvre d'une Request for Single Stage - One IDA / 57640 Engagement and Post Limited 112,000.00 110,402.90 Signed 2019-07-30 2019-07-19 2019-09-24 2019-09-05 2019-11-23 plateforme d'applications au Quotations Envelope Accountability profit de l'ASCE-LC BF-PGEPC-124750-GO-RFQ Strengthening Citizen / Mise en œuvre d'une Request for Single Stage - One IDA / 57640 Engagement and Post Limited 102,000.00 80,292.75 Signed 2019-07-30 2019-07-19 2019-09-24 2019-09-09 2019-11-23 plateforme d'infrastructures Quotations Envelope Accountability au profit de l'ASCE-LC BF-PGEPC-183039-GO-RFQ / Equipements en mobiliers Strengthening Citizen Request for Single Stage - One d'une salle d'audience au IDA / 57640 Engagement and Post Limited 29,380.00 27,020.67 Completed 2020-08-08 2020-07-28 2020-09-26 2020-08-19 2020-11-25 2020-11-30 Quotations Envelope profit du pôle judiciaire Accountability spécialisé du TGI de Ouaga Page 3 BF-PGEPC-183036-GO-RFQ / Equipements informatiques Improving domestic revenue Request for Single Stage - One et mobiliers de bureau IDA / 57640 mobilization and public Post Limited 95,480.00 87,652.88 Signed 2020-08-05 2020-11-04 2020-09-23 2020-11-27 2020-11-23 Quotations Envelope complémentaires pour la salle expenditure management de développement de la DGSI BF-PGEPC-183015-GO-RFQ Strengthening Citizen / Equipements en mobiliers Request for Single Stage - One IDA / 57640 Engagement and Post Limited 7,230.00 6,687.74 Completed 2020-09-06 2020-10-14 2020-11-01 2020-11-10 2020-12-01 2020-12-11 des salles d'attente des USC Quotations Envelope Accountability du MENA/MS BF-PGEPC-217140-GO-RFQ / Impression des rapports Strengthening Citizen Pending Request for Single Stage - One capitalisant les expériences IDA / 57640 Engagement and Post Limited 10,000.00 0.00 Implementati 2021-05-25 2021-07-20 2021-08-20 Quotations Envelope de la FEC et des USC au Accountability on Burkina BF-PGEPC-217078-GO-RFB / Equipements pour la modernisation et Improving domestic revenue Pending renforcement des capacités Single Stage - Two IDA / 57640 mobilization and public Post Request for Bids Open - National 200,000.00 0.00 Implementati 2021-02-20 2021-02-25 2021-03-30 2021-05-24 2021-06-18 2021-09-17 opérationnelles du service des Envelope expenditure management on évaluations et des opérations de bornage des GUF du Burkina Faso BF-PGEPC-217075-GO-DIR / Acquisition d’équipements pour la mise en place d’une DMZ et des services de Improving domestic revenue Pending sécurité d’entreprise pour une IDA / 57640 mobilization and public Post Direct Selection Direct 878,000.00 0.00 Implementati 2021-02-18 2021-02-23 2021-03-30 2021-06-30 ouverture sur Internet et une expenditure management on exploitation sécurisée du SI N@folo et des applications métiers du MINEFID BF-PGEPC-217129-GO-RFQ / Acquisition d’équipements pour renforcer l’autonomie énergétique de la salle Improving domestic revenue Pending énergie du datacenter Request for Single Stage - One IDA / 57640 mobilization and public Post Limited 77,880.00 0.00 Implementati 2021-05-08 2021-06-21 2021-08-31 primaire du MINEFID et mettre Quotations Envelope expenditure management on en place un système de contrôle d’accès, de vidéo surveillance et de détection et d’extinction automatique d’incendie BF-PGEPC-217101-GO-RFB / Acquérir des équipements Improving domestic revenue Under Single Stage - Two pour la mise à niveau des IDA / 57640 mobilization and public Post Request for Bids Open - International 1,500,000.00 0.00 Implementati 2021-02-26 2021-03-15 2021-03-03 2021-04-14 2021-04-20 2021-05-25 2021-08-25 Envelope réseaux locaux existants au expenditure management on profit de la DGSI BF-PGEPC-217113-GO-RFQ / Mobiliers pour équiper les parquets, les cabinets Strengthening Citizen Pending d’instruction et les greffes des Request for Single Stage - One IDA / 57640 Engagement and Post Limited 39,600.00 0.00 Implementati 2021-05-05 2021-06-15 2021-08-16 pôles judiciaires spécialisés Quotations Envelope Accountability on de Ouagadougou et de Bobo- Dioulasso et la DDI du MINEFID BF-PGEPC-219397-GO-RFB / Equipements informatiques au Under Single Stage - Two profit des directions du IDA / 57640 Rapid Response Facility Post Request for Bids Open - National 180,000.00 0.00 Implementati 2021-03-15 2021-03-11 2021-03-20 2021-04-30 2021-05-20 2021-06-16 2021-09-20 Envelope MINEFID (DA/DDI/DGUF) et de on l'ARCOP BF-PGEPC-219396-GO-RFB / Fourniture d’imprimés sécurisés non falsifiables pour les titres d’occupation Improving domestic revenue Pending Single Stage - Two (Attestations, PUH, PE, AMD, IDA / 57640 mobilization and public Post Request for Bids Open - International 150,000.00 0.00 Implementati 2021-03-08 2021-03-13 2021-04-24 2021-05-31 2021-07-05 2021-10-05 Envelope titres fonciers, etc), les Etats expenditure management on de Droits Réels (EDR) et les procurations de vente de terrains au profit de la DGUF BF-PGEPC-219403-GO-RFB / Improving domestic revenue Pending Equipements pour la mise en Single Stage - Two IDA / 57640 mobilization and public Post Request for Bids Open - National 536,000.00 0.00 Implementati 2021-04-30 2021-05-05 2021-06-16 2021-07-15 2021-08-19 2021-11-19 place du projet e-banking de Envelope expenditure management on la DGTCP BF-PGEPC-219966-GO-DIR / Improving domestic revenue Pending Acquérir des images IDA / 57640 mobilization and public Post Direct Selection Direct 50,000.00 0.00 Implementati 2021-03-01 2021-04-05 2021-05-21 2021-07-26 satellitaires au profit de la expenditure management on DGUF BF-PGEPC-224172-GO-DIR / Fourniture de licences de modules (Comptabilité, Improving domestic revenue Pending Commercial) du progiciel IDA / 57640 mobilization and public Post Direct Selection Direct 80,000.00 0.00 Implementati 2021-03-15 2021-03-20 2021-04-30 2021-06-30 SAGE et la formation de vingt expenditure management on (20) agents chargés des enquêtes et du contrôle fiscal au profit de la DGI BF-PGEPC-224176-GO-RFQ / Acquisition et installation Improving domestic revenue Pending Request for Single Stage - One d’équipements de IDA / 57640 mobilization and public Post Limited 44,000.00 0.00 Implementati 2021-04-10 2021-06-05 2021-08-05 Quotations Envelope télécommunication au profit expenditure management on de la DGCMEF BF-PGEPC-224178-GO-RFB / Improving domestic revenue Under Equipements informatiques au Single Stage - Two IDA / 57640 mobilization and public Post Request for Bids Open - National 211,200.00 0.00 Implementati 2021-03-15 2021-03-19 2021-03-20 2021-04-20 2021-05-20 2021-06-20 2021-08-20 profit des structures Envelope expenditure management on déconcentrées de la DGCMEF BF-PGEPC-230097-GO-RFQ Improving domestic revenue Pending Request for Single Stage - One / Edition du budget citoyen IDA / 57640 mobilization and public Post Limited 14,000.00 0.00 Implementati 2021-05-01 2021-06-19 2021-07-19 Quotations Envelope 2021 au profit de la DGB expenditure management on NON CONSULTING SERVICES Page 4 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PGEPC-15260-NC-RFQ / Pending Request for Single Stage - One Assurance santé du personnel IDA / 57640 Project Management Support Post Limited 16,000.00 0.00 Implementati 2017-03-28 2017-05-23 2018-05-18 Quotations Envelope de l'UCP on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PGEPC-15251-CS-CQS / Strengthening Citizen Consultant Pending Stratégie de vulgarisation de IDA / 57640 Engagement and Post Qualification Open - National 24,000.00 0.00 2017-04-27 2017-05-18 2017-07-01 2017-07-31 2017-09-04 2017-11-03 Implementation la loi anti corruption Accountability Selection BF-PGEPC-15194-CS-CQS / Strengthening Citizen Consultant Opérationnalisation de la Pending IDA / 57640 Engagement and Post Qualification Open - National 200,000.00 0.00 2017-09-01 2017-09-22 2017-11-05 2017-12-05 2018-01-09 2018-05-09 déclaration électronique Implementation Accountability Selection d'intérêt et de patrimoine BF-PGEPC-15177-CS-CQS / Strengthening Citizen Consultant Pending Etude de faisabilité du centre IDA / 57640 Engagement and Post Qualification Open - National 14,000.00 0.00 2017-04-27 2017-05-18 2017-07-01 2017-07-31 2017-09-04 2017-10-04 Implementation de formation du RENLAC Accountability Selection BF-PGEPC-15460-CS-CQS / Former les acteurs de la Strengthening Citizen Consultant Pending justice pénale sur la lutte IDA / 57640 Engagement and Post Qualification Open - National 20,000.00 0.00 2017-07-30 2017-08-20 2017-10-03 2017-11-02 2017-12-07 2018-01-06 Implementation contre les crimes Accountability Selection économiques et financiers BF-PGEPC-15198-CS-CQS / Improving domestic revenue Consultant Pending Auditer et développer le IDA / 57640 mobilization and public Post Qualification Open - National 260,000.00 0.00 2017-05-31 2017-06-21 2017-08-04 2017-09-03 2017-10-08 2018-02-05 Implementation logiciel IFU expenditure management Selection BF-PGEPC-15248-CS-CQS / Etude d'impact de la Improving domestic revenue Consultant Pending segmentation de la TVA sur IDA / 57640 mobilization and public Post Qualification Open - National 100,000.00 0.00 2017-06-01 2017-06-22 2017-08-05 2017-09-04 2017-10-09 2017-12-08 Implementation les performances des expenditure management Selection DGE/DME BF-PGEPC-14599-CS-CQS / Improving domestic revenue Consultant Pending Elaborer un plan de IDA / 57640 mobilization and public Post Qualification Open - National 50,000.00 0.00 2017-05-24 2017-06-14 2017-07-28 2017-08-27 2017-10-01 2017-11-30 Implementation communication de la DGI expenditure management Selection BF-PGEPC-15463-CS-CQS / Improving domestic revenue Consultant Pending Relecture du code général des IDA / 57640 mobilization and public Post Qualification Open - National 140,000.00 0.00 2017-01-27 2017-02-17 2017-04-02 2017-05-02 2017-06-06 2017-09-14 Implementation impôts expenditure management Selection BF-PGEPC-15256-CS-CQS / Improving domestic revenue Consultant Logiciel de suivi de la IDA / 57640 mobilization and public Post Qualification Open - National 80,000.00 135,334.70 Completed 2017-07-15 2017-05-19 2017-08-05 2017-09-18 2017-10-18 2017-11-08 2017-11-22 2017-12-19 2018-02-20 2018-10-04 passation des marchés et expenditure management Selection d'alerte sur les délais BF-PGEPC-15459-CS-CQS / Improving domestic revenue Consultant Elaborer les documents de Pending IDA / 57640 mobilization and public Post Qualification Open - National 120,000.00 0.00 2017-06-30 2017-07-21 2017-09-03 2017-10-03 2017-11-07 2017-12-07 sécurité du système Implementation expenditure management Selection d'information du MINEFID BF-PGEPC-15730-CS-CQS / Developer un logiciel libre de Improving domestic revenue Consultant gestion du par cet un logiciel IDA / 57640 mobilization and public Post Qualification Open - National 190,000.00 710,655.24 Terminated 2017-07-27 2017-11-15 2017-08-17 2017-09-30 2018-04-17 2017-10-30 2018-04-18 2017-12-04 2018-07-31 2018-02-02 pour la surveillance et expenditure management Selection l'administration réseau BF-PGEPC-15726-CS-CQS / Mettre en place une Improving domestic revenue Consultant Pending architecture d'entreprise et IDA / 57640 mobilization and public Post Qualification Open - National 16,000.00 0.00 2017-09-01 2017-09-22 2017-11-05 2017-12-05 2018-01-09 2018-03-10 Implementation une stratégie d'intégration des expenditure management Selection systèmes BF-PGEPC-15255-CS-CQS / Improving domestic revenue Consultant Mise en place d'un processus Pending IDA / 57640 mobilization and public Post Qualification Open - National 120,000.00 0.00 2017-02-14 2017-03-07 2017-04-20 2017-05-20 2017-06-24 2017-09-22 de certification des acteurs Implementation expenditure management Selection des marchés publics BF-PGEPC-15207-CS-CQS / Elaborer un modèle de manuel Improving domestic revenue Consultant de procédures pour les MOD IDA / 57640 mobilization and public Post Qualification Open - National 100,000.00 83,558.36 Completed 2017-04-27 2017-03-01 2017-05-18 2017-07-01 2017-07-31 2017-06-29 2017-09-04 2017-07-17 2017-11-03 2018-02-07 et developper une application expenditure management Selection pour le suivi des conventions BF-PGEPC-15727-CS-CQS / Improving domestic revenue Consultant Etablir un accord de niveau de IDA / 57640 mobilization and public Post Qualification Open - National 44,000.00 0.00 Canceled 2018-01-20 2018-02-10 2018-03-26 2018-04-25 2018-05-30 2018-07-29 service(SLA) expenditure management Selection BF-PGEPC-30390-CS-CQS / Improving domestic revenue Consultant Schéma directeur des Pending IDA / 57640 mobilization and public Post Qualification Open - National 60,000.00 0.00 2017-05-02 2017-05-23 2017-07-06 2017-08-05 2017-09-09 2018-03-08 systèmes d'information de Implementation expenditure management Selection l'ASCE-LC BF-PGEPC-30392-CS-CQS / Formation des contrôleurs d'Etat en techniques Improving domestic revenue Consultant d’investigation, rédaction de IDA / 57640 mobilization and public Post Qualification Open - National 30,000.00 25,794.49 Signed 2017-07-13 2017-06-09 2017-08-03 2017-09-16 2017-07-14 2017-10-16 2017-09-19 2017-11-20 2017-10-04 2018-05-19 PV, techniques de lutte contre expenditure management Selection la corruption et résolution des cas pratiques BF-PGEPC-30389-CS-CQS / Mise en place d’une unite de Strengthening Citizen Consultant Pending service à la clientele dans les IDA / 57640 Engagement and Post Qualification Open - National 75,000.00 0.00 2017-07-28 2017-08-18 2017-10-01 2017-10-31 2017-12-05 2018-06-03 Implementation Ministères de l’Education Accountability Selection nationale et de la Santé Page 5 BF-PGEPC-30338-CS-CQS / Mise en place de la carte de Strengthening Citizen Consultant pointage communautaires Pending IDA / 57640 Engagement and Post Qualification Open - National 100,000.00 0.00 2017-07-26 2017-08-16 2017-09-29 2017-10-29 2017-12-03 2018-06-01 dans les Ministères de Implementation Accountability Selection l’Education nationale et de la Santé BF-PGEPC-30340-CS-QCBS / Quality And Cost- Pending IDA / 57640 Project Management Support Post Open - National 34,800.00 0.00 2017-04-11 2017-05-02 2017-06-15 2017-07-13 2017-08-12 2017-09-16 2017-10-21 2018-10-21 Audit des comptes de l'UCP Based Selection Implementation BF-PGEPC-31297-CS-CQS / Improving domestic revenue Consultant Under Formation des informaticiens IDA / 57640 mobilization and public Post Qualification Open - National 180,000.00 0.00 2017-09-29 2017-10-06 2017-10-20 2017-12-03 2018-01-15 2018-01-02 2018-02-06 2018-08-05 Implementation du MINEFID et de l’ANPTIC expenditure management Selection BF-PGEPC-30337-CS-QCBS / Improving domestic revenue Quality And Cost- Recensement général des IDA / 57640 mobilization and public Prior Open - International 1,200,000.00 1,012,695.77 Signed 2017-10-27 2017-11-17 2017-11-19 2017-12-31 2018-01-23 2018-01-28 2018-03-20 2018-02-27 2018-04-04 2018-04-03 2018-06-05 2018-05-08 2018-07-02 2019-05-08 Based Selection contribuables expenditure management BF-PGEPC-14600-CS-CQS / Renforcer le système de Improving domestic revenue Consultant recoupement d'informations IDA / 57640 mobilization and public Post Qualification Open - National 100,000.00 127,848.55 Signed 2017-09-28 2017-10-10 2017-10-19 2017-12-02 2017-12-21 2018-01-01 2017-12-22 2018-01-18 2018-02-02 2018-03-19 fiscales dans SINTAX et mise expenditure management Selection en place d'interfaces avec des bases de données extérieures BF-PGEPC-30336-CS-QCBS / Strengthening Citizen Assistance à la maîtrise Quality And Cost- IDA / 57640 Engagement and Post Open - International 400,000.00 796,233.94 Signed 2017-10-27 2017-06-21 2017-11-17 2017-11-09 2017-12-31 2018-01-12 2018-01-28 2018-03-23 2018-02-27 2018-03-26 2018-04-03 2018-06-14 2018-05-08 2018-09-07 2019-05-08 d'ouvrage informatique Based Selection Accountability (AMOA) BF-PGEPC-45366-CS-CQS / Service d'un consultant pour la saisie des listes Improving domestic revenue Consultant d'attributaires de terrain au IDA / 57640 mobilization and public Post Qualification Open - National 40,000.00 34,493.48 Terminated 2017-10-19 2017-10-31 2017-11-09 2017-12-23 2018-02-14 2018-01-22 2018-02-14 2018-02-26 2018-03-13 2018-08-25 profit de la DGI dans le cadre expenditure management Selection des activités préalables au recensement fiscal BF-PGEPC-45369-CS-CQS / Service de consultant pour la conception et mise en œuvre Improving domestic revenue Consultant d'un programme de gestion IDA / 57640 mobilization and public Post Qualification Open - National 90,000.00 129,599.68 Completed 2017-11-20 2017-10-30 2017-12-11 2018-01-24 2018-01-31 2018-02-23 2018-02-08 2018-03-30 2018-03-15 2018-09-26 2019-05-30 des risques expenditure management Selection informatiques/ANPTIC/DGSI/ DGTCP/DGD/DGI BF-PGEPC-15718-CS-CQS / Elaborer un module relatif aux Improving domestic revenue Consultant insuffisances des offres et IDA / 57640 mobilization and public Post Qualification Open - National 88,000.00 0.00 Canceled 2017-09-05 2017-09-26 2017-11-09 2017-12-09 2018-01-13 2018-04-13 former les acteurs de la expenditure management Selection passation et les soumissionnaires BF-PGEPC-48677-CS-CQS / Mise en place d'une Strengthening Citizen Consultant plateforme de déclaration IDA / 57640 Engagement and Post Qualification Open - National 120,000.00 137,072.65 Signed 2018-09-10 2018-04-06 2018-10-01 2018-11-14 2018-09-18 2018-12-14 2018-10-03 2019-01-18 2018-10-23 2019-07-17 d'intérêts et de patrimoine au Accountability Selection profit de l’ASCE-LC BF-PGEPC-48689-CS-QBS / Services de prestataire en Improving domestic revenue Quality Based communication pour la mise IDA / 57640 mobilization and public Post Open - International 540,000.00 0.00 Canceled 2018-02-28 2018-03-21 2018-05-04 2018-06-01 2018-07-01 2018-07-31 2019-09-03 2020-09-02 Selection en œuvre du plan de expenditure management communication de la DGI BF-PGEPC-48694-CS-CQS / Service de consultant pour Improving domestic revenue Consultant former les membres de IDA / 57640 mobilization and public Post Qualification Open - National 55,260.00 49,404.50 Signed 2018-06-04 2018-06-13 2018-06-25 2018-08-08 2018-08-17 2018-09-07 2018-08-28 2018-10-12 2018-09-13 2018-12-11 l’Organe de Règlement des expenditure management Selection Différends au profit de l'ARCOP BF-PGEPC-48701-CS-CQS / Service de consultant pour Consultant élaborer les outils IDA / 57640 Rapid Response Facility Post Qualification Open - National 160,000.00 0.00 Canceled 2018-06-25 2018-07-16 2018-08-29 2018-09-28 2018-11-02 2018-12-30 d’évaluation des coûts des Selection actions des programmes budgétaires au profi de la DGB BF-PGEPC-48680-CS-CQS / Consultant Elaborer le plan de IDA / 57640 Project Management Support Post Qualification Open - National 20,000.00 16,822.18 Signed 2018-03-26 2018-02-28 2018-04-16 2018-05-30 2018-05-14 2018-06-29 2018-05-22 2018-08-03 2018-06-04 2018-10-02 communication du PGEPC Selection BF-PGEPC-50924-CS-QCBS / Elaboration d'une politique de sécurité des systèmes d'information, d'un cadre Improving domestic revenue Quality And Cost- sécurisé pour l'ouverture des IDA / 57640 mobilization and public Post Open - International 400,000.00 319,593.14 Completed 2018-03-05 2018-03-01 2018-03-26 2018-03-16 2018-05-09 2018-04-24 2018-06-06 2019-01-11 2018-07-06 2019-01-29 2018-08-10 2019-06-12 2018-09-14 2019-07-05 2019-02-04 2020-01-20 Based Selection applications métiers sur le expenditure management Web et d'un plan de reprise des activités pour le MINEFID/ANPTIC BF-PGEPC-48685-CS-QCBS / Improving domestic revenue Consultant Elaboration du schéma IDA / 57640 mobilization and public Post Qualification Open - National 100,000.00 0.00 Canceled 2018-03-30 2018-04-20 2018-06-03 2018-07-03 2018-08-07 2018-12-06 directeur des systèmes expenditure management Selection d'information du MINEFID BF-PGEPC-60500-CS-QCBS / Service de consultant pour élaborer le schéma directeur Improving domestic revenue Quality And Cost- des systèmes d'informations IDA / 57640 mobilization and public Post Open - International 356,000.00 682,343.62 Signed 2018-04-30 2018-04-06 2018-05-21 2018-04-30 2018-07-04 2018-10-29 2018-08-01 2019-01-08 2018-08-31 2019-01-14 2018-10-05 2019-02-26 2018-11-09 2019-06-20 2018-12-31 Based Selection du MINEFID et les sous- expenditure management schémas directeurs de la DGD, DGTCP et DGI BF-PGEPC-60490-CS-CQS / Service de consultant pour l'hébergement et la Improving domestic revenue Consultant maintenance de l'application IDA / 57640 mobilization and public Post Qualification Open - National 48,000.00 0.00 Canceled 2018-04-30 2018-05-21 2018-07-04 2018-08-03 2018-09-07 2019-03-06 de suivi des conventions des expenditure management Selection maîtrises d'ouvrage Déléguée (COMOD) Page 6 BF-PGEPC-48744-CS-CDS / Service d'un consultant pour élaborer un manuel de Strengthening Citizen Consultant procédures d'enquêtes et IDA / 57640 Engagement and Post Qualification Open - National 100,000.00 0.00 Canceled 2018-04-16 2018-05-07 2018-06-20 2018-07-20 2018-08-24 2018-12-24 d'investigations au profit des Accountability Selection contrôleurs d'Etat de l'ASCE- LC BF-PGEPC-71194-CS-CQS / Recrutement d'une agence de Improving domestic revenue Consultant communication chargée IDA / 57640 mobilization and public Post Qualification Open - National 20,000.00 24,112.50 Signed 2018-07-25 2018-07-20 2018-08-15 2018-09-28 2018-10-29 2018-10-28 2018-10-30 2018-12-02 2018-11-13 2019-05-31 d'accompagner la DGI pour la expenditure management Selection mise en œuvre de son plan de communication. BF-PGEPC-99104-CS-CQS / Service d'une agence de communication chargé de l'élaboration et la mise en Improving domestic revenue Consultant œuvre d'une stratégie et d'un IDA / 57640 mobilization and public Post Qualification Open - National 123,400.00 106,741.24 Signed 2019-02-11 2018-11-02 2019-03-04 2019-04-17 2019-01-21 2019-05-17 2019-01-22 2019-06-21 2019-02-01 2019-09-23 plan de communication dans expenditure management Selection le cadre de l'ouverture de SYDONIA WORLD sur internet au profit de la DGD BF-PGEPC-100196-CS-CQS / Service d'une agence de communication pour réaliser Strengthening Citizen Consultant et diffuser des spots télé et Pending IDA / 57640 Engagement and Post Qualification Open - National 30,000.00 0.00 2019-04-15 2019-05-06 2019-06-19 2019-07-19 2019-08-21 2019-11-19 radio sur la divulgation des Implementation Accountability Selection informations et données budgétaires au profit de la DGB BF-PGEPC-100242-CS-CQS / Service de consultant pour Strengthening Citizen Consultant Pending élaborer la plateforme sur la IDA / 57640 Engagement and Post Qualification Open - National 30,000.00 0.00 2019-05-10 2019-05-31 2019-07-14 2019-08-13 2019-09-17 2019-12-16 Implementation fiche d'évaluation Accountability Selection comunautaire BF-PGEPC-100202-CS-CQS / Service de consultant pour Strengthening Citizen Consultant Pending réaliser une vidéo sur la fiche IDA / 57640 Engagement and Post Qualification Open - National 24,000.00 0.00 2019-05-15 2019-06-05 2019-07-19 2019-08-18 2019-09-22 2019-10-22 Implementation communautaire à des fins de Accountability Selection communications BF-PGEPC-100130-CS-CQS / Improving domestic revenue Consultant Service de consultant pour le IDA / 57640 mobilization and public Post Qualification Open - National 295,000.00 417,673.48 Signed 2019-03-05 2019-03-20 2019-03-26 2019-05-09 2019-06-06 2019-06-08 2019-08-14 2019-07-13 2019-12-26 2019-11-12 développement d'un système expenditure management Selection décisionnel au profit de la DGI BF-PGEPC-100247-CS-CQS / Service de consultant pour Improving domestic revenue Consultant Pending généraliser e-SINTAX et IDA / 57640 mobilization and public Post Qualification Open - National 260,000.00 0.00 2019-04-15 2019-05-06 2019-06-19 2019-07-19 2019-08-23 2019-12-02 Implementation mettre en place une nouvelle expenditure management Selection version au profit de la DGI BF-PGEPC-100127-CS-CQS / Service de consultant pour lle Improving domestic revenue Consultant contrôle et l'assurance qualité IDA / 57640 mobilization and public Post Qualification Open - National 184,788.00 0.00 Under Review 2019-02-15 2019-03-19 2019-03-08 2019-04-21 2019-05-21 2019-06-25 2019-10-24 des travaux du SIGFP au profit expenditure management Selection de la DGSI BF-PGEPC-100218-CS-CQS / Service de consultant pour évaluer les capacités en Improving domestic revenue Consultant Under matière de commande IDA / 57640 mobilization and public Post Qualification Open - National 130,000.00 0.00 2019-03-20 2019-03-11 2019-04-10 2019-05-24 2019-07-04 2019-06-23 2019-07-28 2019-10-26 Implementation publique au Burkina Faso et expenditure management Selection proposer des mesures correctives BF-PGEPC-100252-CS-CQS / Service de consultant pour la Improving domestic revenue Consultant reconversion des données du Pending IDA / 57640 mobilization and public Post Qualification Open - National 120,000.00 0.00 2019-06-15 2019-07-06 2019-08-19 2019-09-18 2019-10-23 2019-12-23 recensement fiscal dans un Implementation expenditure management Selection format compatible avec la base de données de la DGI BF-PGEPC-100243-CS-CQS / Consultant Service d'un consultant pour IDA / 57640 Project Management Support Post Qualification Open - National 100,000.00 0.00 Under Review 2019-02-28 2019-03-19 2019-03-21 2019-05-04 2019-06-03 2019-07-08 2019-09-13 la réalisation de la revue à mi- Selection parcours du PGEPC BF-PGEPC-100238-CS-CQS / Planification de la Strengthening Citizen Consultant communication pour le Pending IDA / 57640 Engagement and Post Qualification Open - National 120,000.00 0.00 2019-03-10 2019-03-31 2019-05-14 2019-06-13 2019-07-18 2019-09-17 lancement de la plateforme de Implementation Accountability Selection déclaration d’intérêt et de patrimoine BF-PGEPC-100249-CS-CQS / Strengthening Citizen Consultant Service de consultant pour IDA / 57640 Engagement and Post Qualification Open - National 11,250.00 0.00 Canceled 2019-05-20 2019-06-10 2019-07-24 2019-08-23 2019-09-27 2019-11-27 élaborer un plan de formation Accountability Selection des USC du MENA/MS BF-PGEPC-150562-CS-CQS / Service de consultant (firme) Improving domestic revenue Consultant pour asurer la formation de IDA / 57640 mobilization and public Post Qualification Open - National 20,000.00 16,530.73 Signed 2020-01-28 2019-05-28 2020-02-18 2020-04-02 2019-08-13 2020-05-02 2019-08-14 2020-06-06 2019-11-13 2020-06-24 dix (10) formateurs de la DGI expenditure management Selection sur le SYSCOHADA révisé BF-PGEPC-159450-CS-LCS / Service d'un cabinet (firme) Least Cost chargé de l'audit financier et IDA / 57640 Project Management Support Post Open - National 28,000.00 9,476.34 Signed 2020-02-28 2020-02-21 2020-03-20 2020-05-03 2020-06-19 2020-05-31 2020-09-14 2020-06-30 2020-09-18 2020-08-04 2020-10-20 2020-09-08 2020-12-17 2021-03-07 Selection comptable du PGEPC, exercices 2020 et 2021 BF-PGEPC-183028-CS-CQS / Strengthening Citizen Consultant Service d'un cabinet pour la IDA / 57640 Engagement and Post Qualification Open - International 70,800.00 0.00 Canceled 2020-07-31 2020-08-21 2020-09-21 2020-10-21 2020-11-25 2021-05-24 maintenance de la plateforme Accountability Selection DIP de l'ASCE-LC Page 7 BF-PGEPC-183014-CS-CQS / Strengthening Citizen Consultant Service d'un cabinet chargé de IDA / 57640 Engagement and Post Qualification Open - National 24,000.00 22,041.74 Signed 2020-08-05 2020-09-29 2020-08-26 2020-09-23 2020-12-07 2020-10-23 2020-12-08 2020-11-27 2020-12-30 2020-12-28 réaliser un film sur la FEC au Accountability Selection profit du MENA/MS BF-PGEPC-183026-CS-QBS / Service d'un cabinet pour l'étude de préparation à la Improving domestic revenue Quality Based Under préparation de la IDA / 57640 mobilization and public Post Open - International 300,000.00 0.00 2020-07-31 2020-09-04 2020-08-21 2020-09-23 2020-09-21 2020-11-30 2020-10-19 2020-10-30 2020-11-10 2020-12-15 2021-03-15 Selection Implementation professionnalisation de la expenditure management fonction passation des marchés BF-PGEPC-217062-CS-CQS / Recrutement d’un cabinet de consultants pour des Improving domestic revenue Consultant Under formations (Cisco Firewall IDA / 57640 mobilization and public Post Qualification Open - National 48,000.00 0.00 2021-06-30 2021-02-19 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 Implementation ASA + Linux expenditure management Selection Engineer Bootstrap 4 + VBA Excel avancé)/DGI-DI BF-PGEPC-217072-CS-CQS / Service de consultants pour le Improving domestic revenue Consultant développement d’une Under IDA / 57640 mobilization and public Post Qualification Open - International 299,000.00 0.00 2021-02-22 2021-02-19 2021-03-05 2021-03-30 2021-04-12 2021-04-30 2021-07-30 application eCME et la Implementation expenditure management Selection fourniture de deux (02) kits d’exploitation complets BF-PGEPC-217071-CS-CQS / Service de consultants pour une étude de faisabilité Improving domestic revenue Consultant portant sur la mise en place Under IDA / 57640 mobilization and public Post Qualification Open - National 141,600.00 0.00 2021-02-22 2021-03-18 2021-03-10 2021-03-30 2021-04-15 2021-05-14 2021-07-14 d’un système transparent et Implementation expenditure management Selection moderne de gestion sécurisée des titres d’occupation et autres actes fonciers/DGUF BF-PGEPC-217105-CS-CQS / Recrutement d’un cabinet de consultant pour la mise en place d’un système de gestion Consultant Under du portefeuille titres de l’État IDA / 57640 Rapid Response Facility Post Qualification Open - National 247,000.00 0.00 2021-02-19 2021-02-22 2021-03-05 2021-03-22 2021-03-31 2021-04-16 2021-06-30 Implementation et d’un système de gestion de Selection la tutelle du secteur des assurances au profit de la DGTCP BF-PGEPC-217147-CS-CQS / Service d'un consultant pour la production d'un rapport d’étude sur les priorités du Consultant Pending gouvernement en matière de IDA / 57640 Project Management Support Post Qualification Open - National 100,000.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-06-30 2021-07-26 2021-09-30 Implementation réformes de la gouvernance Selection économique au Burkina Faso assorti d'un recueil de propositions des actions BF-PGEPC-219404-CS-CQS / Service de cabinet pour Strengthening Citizen Consultant Under l’élaboration d’outils pour les IDA / 57640 Engagement and Post Qualification Open - National 90,000.00 0.00 2021-02-25 2021-02-22 2021-03-18 2021-04-15 2021-04-30 2021-05-31 2021-08-30 Implementation achats durables au profit de Accountability Selection l'ARCOP BF-PGEPC-219405-CS-CQS / Service d’un cabinet pour Improving domestic revenue Consultant évaluer les capacités des Under IDA / 57640 mobilization and public Post Qualification Open - National 75,000.00 0.00 2021-03-22 2021-02-24 2021-04-12 2021-05-12 2021-05-31 2021-06-30 2021-09-30 communes à passer les Implementation expenditure management Selection marchés au profit de la DGCMEF BF-PGEPC-219402-CS-CQS / Service d'un consultant pour la conception et Improving domestic revenue Consultant Pending l’implémentation informatique IDA / 57640 mobilization and public Post Qualification Open - National 80,000.00 0.00 2021-04-20 2021-05-11 2021-06-24 2021-07-05 2021-07-30 2021-10-29 Implementation de la comptabilité des expenditure management Selection engagements du budget au profit de la DGCMEF BF-PGEPC-219401-CS-CQS / Service d'un prestataire pour Improving domestic revenue Consultant la mise en place de la banque Under IDA / 57640 mobilization and public Post Qualification Open - National 150,000.00 0.00 2021-04-15 2021-03-24 2021-04-30 2021-05-31 2021-06-15 2021-06-30 2021-09-30 en ligne (e-banking, mobile- Implementation expenditure management Selection banking) au profit de la DGTCP BF-PGEPC-219399-CS-CQS / Service d'un cabinet pour évaluer les avantages et les inconvénients de l’option de Improving domestic revenue Consultant sous-traitance de l’activité IDA / 57640 mobilization and public Post Qualification Open - National 124,000.00 0.00 Canceled 2021-05-01 2021-05-17 2021-06-14 2021-07-14 2021-08-18 2021-11-18 bancaire à des banques expenditure management Selection commerciales sélectionnées sur une base compétitive auprofit de la DGTCP BF-PGEPC-219965-CS-CQS / Service d'une firme pour la formation d’ingénieurs au Improving domestic revenue Consultant profit de la Direction Générale IDA / 57640 mobilization and public Post Qualification Open - National 48,000.00 0.00 Canceled 2021-04-01 2021-04-16 2021-05-31 2021-06-15 2021-07-15 2021-09-15 des Impôts à la maîtrise de expenditure management Selection l’environnement de production de e-SINTAX BF-PGEPC-227885-CS-CQS / Recrutement d'un cabinet de consultants pour conduire Improving domestic revenue Consultant l'étude sur l'impact éventuel Under IDA / 57640 mobilization and public Post Qualification Open - National 60,000.00 0.00 2021-04-06 2021-04-14 2021-04-20 2021-05-19 2021-05-31 2021-06-30 2021-09-30 du retrait des fonds des Implementation expenditure management Selection projets et programmes sur les banques commerciales au profit de la DGTCP BF-PGEPC-230081-CS-CQS / Service d’une agence de Consultant Under communication pour produire IDA / 57640 Project Management Support Post Qualification Open - National 60,000.00 0.00 2021-04-26 2021-05-19 2021-05-10 2021-06-08 2021-06-30 2021-07-30 2021-09-30 Implementation un film documentaire au Selection profit du PGEPC Page 8 BF-PGEPC-236627-CS-CQS / Consultant Service d'un cabinet chargé de Under IDA / 57640 Project Management Support Post Qualification Open - National 60,000.00 0.00 2021-05-31 2021-06-03 2021-06-21 2021-07-05 2021-07-20 2021-08-10 2021-09-24 l'élaboration du rapport Implementation Selection d'achèvement du PGEPC INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PGEPC-15466-CS-INDV / Strengthening Citizen Individual Accompagner les travaux de Pending IDA / 57640 Engagement and Post Consultant Limited 10,000.00 0.00 2017-04-06 2017-04-11 2017-05-02 2017-06-06 2017-06-26 l'atelier diagnostic et Implementation Accountability Selection élaboration de directives DGB BF-PGEPC-15462-CS-INDV / Strengthening Citizen Individual Formation des contrôleurs Pending IDA / 57640 Engagement and Post Consultant Limited 16,000.00 0.00 2017-08-01 2017-08-06 2017-08-27 2017-10-01 2017-10-31 d'Etat en technique Implementation Accountability Selection d'investigation BF-PGEPC-15725-CS-INDV / Formation des contrôleurs Strengthening Citizen Individual Pending d'Etat en technique de lutte IDA / 57640 Engagement and Post Consultant Limited 26,702.00 0.00 2017-09-15 2017-09-20 2017-10-11 2017-11-15 2017-12-15 Implementation contre la corruption et Accountability Selection résolution de cas Strengthening Citizen Individual BF-PGEPC-15253-CS-INDV / Pending IDA / 57640 Engagement and Post Consultant Limited 52,200.00 0.00 2017-01-06 2017-01-11 2017-02-01 2017-03-08 2018-03-03 Expert en gouvernance Implementation Accountability Selection BF-PGEPC-15259-CS-INDV / Improving domestic revenue Individual Pending Expert en système IDA / 57640 mobilization and public Post Consultant Limited 52,200.00 0.00 2016-12-16 2016-12-21 2017-01-11 2017-02-15 2017-08-14 Implementation d'informations expenditure management Selection Individual BF-PGEPC-15176-CS-INDV / Pending IDA / 57640 Rapid Response Facility Post Consultant Open 52,200.00 0.00 2017-01-06 2017-02-24 2017-03-17 2017-04-21 2018-04-16 Expert en finances publiques Implementation Selection BF-PGEPC-15461-CS-INDV / Strengthening Citizen Individual Pending Accompagner l'équipe IDA / 57640 Engagement and Post Consultant Limited 11,000.00 0.00 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-03 Implementation technique du CIFOEB Accountability Selection BF-PGEPC-15262-CS-INDV / Improving domestic revenue Individual Vérification des opérations Pending IDA / 57640 mobilization and public Post Consultant Limited 4,000.00 0.00 2017-03-28 2017-04-02 2017-04-23 2017-05-28 2017-06-07 douanières dans la Implementation expenditure management Selection comptabilité des entreprises BF-PGEPC-15720-CS-INDV / Former les acteurs et assurer Improving domestic revenue Individual la revue qualité des livrables Pending IDA / 57640 mobilization and public Post Consultant Limited 50,000.00 0.00 2017-02-13 2017-02-18 2017-03-11 2017-04-15 2017-07-24 pour l'élaboration de la Implementation expenditure management Selection cartographie des risques de 5 ministères BF-PGEPC-31299-CS-INDV / Service d’un spécialiste en Strengthening Citizen Individual infographie pour IDA / 57640 Engagement and Post Consultant Limited 16,000.00 13,078.38 Signed 2017-09-01 2017-09-13 2017-09-06 2017-09-19 2017-09-27 2017-10-16 2017-11-01 2017-11-06 2018-06-27 accompagner l’élaboration du Accountability Selection budget citoyen 2018 BF-PGEPC-31301-CS-INDV / Assistance en systèmes Improving domestic revenue Individual d’informations au profit de la IDA / 57640 mobilization and public Post Consultant Limited 53,400.00 44,872.02 Signed 2017-05-25 2017-06-02 2017-05-30 2017-07-18 2017-06-20 2017-08-28 2017-07-25 2017-08-29 2018-01-21 DGSI/DGI/DGD/DGTCP et expenditure management Selection autres structures BF-PGEPC-30394-CS-INDV / Service d’un spécialiste en Strengthening Citizen Individual infographie pour IDA / 57640 Engagement and Post Consultant Open 16,000.00 0.00 Canceled 2017-09-26 2017-11-14 2017-12-05 2018-01-09 2018-07-08 accompagner l’élaboration du Accountability Selection budget citoyen 2018 BF-PGEPC-45372-CS-INDV / Service de consultant pour accopagner la DGEP pour la Individual Pending revue des projets et IDA / 57640 Rapid Response Facility Post Consultant Limited 18,462.00 0.00 2017-11-05 2017-11-10 2017-12-01 2018-01-05 2018-07-04 Implementation programmes de Selection développement au profit du MINEFID BF-PGEPC-45377-CS-INDV / Service de consultant pour la formation des formateurs sur Improving domestic revenue Individual les logiciels QGIS/POSTGIS au IDA / 57640 mobilization and public Post Consultant Limited 9,500.00 6,612.09 Signed 2017-10-01 2017-08-03 2017-10-06 2017-10-16 2017-10-27 2017-12-18 2017-12-01 2018-01-18 2018-05-30 profit de la DGI dans le cadre expenditure management Selection des activités préalables au recensement fiscal BF-PGEPC-45359-CS-INDV / Former les acteurs du Improving domestic revenue Individual Ministère des Infrastructures Under IDA / 57640 mobilization and public Post Consultant Limited 25,780.00 0.00 2017-06-20 2017-06-05 2017-06-25 2017-07-16 2017-08-20 2018-02-16 intervenant dans le processus Implementation expenditure management Selection de passation des marchés publics BF-PGEPC-48715-CS-INDV / Service d'un infographiste Strengthening Citizen Individual pour la finalisation du budget IDA / 57640 Engagement and Post Consultant Limited 14,000.00 36,318.06 Signed 2018-10-30 2018-07-10 2018-11-04 2018-07-18 2018-11-25 2018-07-27 2018-12-30 2018-09-11 2019-01-30 citoyen 2019 au profit de la Accountability Selection DGB BF-PGEPC-48688-CS-INDV / Formation des assistants Strengthening Citizen Individual spécialisés auprès des pôles IDA / 57640 Engagement and Post Consultant Limited 14,000.00 0.00 Canceled 2018-06-30 2018-07-05 2018-07-26 2018-08-30 2018-09-24 économiques et financiers du Accountability Selection Ministère de la Justice BF-PGEPC-48735-CS-INDV / Strengthening Citizen Individual Service d'un expert en IDA / 57640 Engagement and Post Consultant Limited 52,200.00 28,142.85 Signed 2018-01-30 2017-12-28 2018-02-04 2018-01-02 2018-02-25 2018-01-16 2018-04-01 2018-02-02 2018-09-28 gouvernance Accountability Selection Page 9 BF-PGEPC-48693-CS-INDV / Recrutement d’un consultant Improving domestic revenue Individual national en sécurité des IDA / 57640 mobilization and public Post Consultant Limited 12,000.00 11,318.88 Signed 2018-03-05 2017-12-05 2018-03-10 2018-03-12 2018-03-31 2018-03-13 2018-05-05 2018-03-23 2018-11-01 systèmes d’information dans expenditure management Selection le cadre de l’ouverture de SYDONIA WORLD sur le net BF-PGEPC-48684-CS-INDV / Improving domestic revenue Individual Expert en systèmes IDA / 57640 mobilization and public Post Consultant Limited 52,200.00 70,756.51 Signed 2018-03-05 2018-03-19 2018-03-10 2018-04-12 2018-03-31 2018-04-20 2018-05-05 2018-05-08 2018-11-01 d’informations expenditure management Selection Individual BF-PGEPC-48731-CS-INDV / IDA / 57640 Rapid Response Facility Post Consultant Limited 52,200.00 25,115.86 Signed 2018-02-28 2018-03-19 2018-03-05 2018-04-06 2018-03-26 2018-04-25 2018-04-30 2018-05-11 2019-04-30 Expert en finances publiques Selection BF-PGEPC-48719-CS-INDV / Service de consultant pour la Individual mise en place d’un système IDA / 57640 Project Management Support Post Consultant Limited 10,000.00 0.00 Canceled 2018-07-30 2018-08-04 2018-08-25 2018-09-29 2018-10-31 informatisé de stockage de Selection données au profit de l’UCP BF-PGEPC-48713-CS-CQS / Service d'un consultant Strengthening Citizen Individual individuel pour l'assistance à IDA / 57640 Engagement and Post Consultant Limited 120,000.00 55,265.17 Signed 2018-03-30 2018-03-16 2018-04-04 2018-03-16 2018-04-25 2018-04-20 2018-05-30 2018-05-30 2018-11-26 la maîtrise d'ouvrage des Accountability Selection projets SI de l'ASCE-LC BF-PGEPC-63374-CS-INDV / Service d'un expert en Individual gouvernance pour l'assistance IDA / 57640 Rapid Response Facility Post Consultant Limited 34,000.00 29,982.56 Signed 2018-05-18 2018-03-13 2018-05-23 2018-04-06 2018-06-13 2018-04-20 2018-07-18 2018-05-11 2019-01-14 à la mise en œuvre des Selection activités de la sous- composante 1.2 du PGEPC BF-PGEPC-63384-CS-INDV / Service d'un expert chargé de Strengthening Citizen Individual l'élaboration d'un manuel de IDA / 57640 Engagement and Post Consultant Limited 100,000.00 91,720.65 Completed 2018-05-31 2018-06-01 2018-06-05 2018-06-12 2018-06-26 2018-07-16 2018-07-31 2018-07-10 2018-10-31 2018-12-24 procédures d'enquêtes et Accountability Selection d'investigation au profit de l'ASCE-LC BF-PGEPC-59822-CS-CDS / Improving domestic revenue Service de consultant pour IDA / 57640 mobilization and public Post Direct Selection Direct 534,380.00 472,337.74 Completed 2018-06-04 2018-06-01 2018-06-14 2018-06-08 2018-08-18 2018-07-10 2018-11-30 2018-07-31 l'ouverture de la expenditure management téléprocédure sur SINTAX au profit de la DGI BF-PGEPC-71188-CS-INDV / Recrutement d'un consultant individuel chargé de la Strengthening Citizen Individual formation des inspecteurs des IDA / 57640 Engagement and Post Consultant Limited 20,000.00 31,144.68 Signed 2018-07-30 2018-09-17 2018-08-04 2019-01-24 2018-08-25 2019-02-14 2018-09-29 2019-03-13 2019-10-29 finances sur la démarche et Accountability Selection l'organisation d'une mission d'audit de performance BF-PGEPC-92960-CS-INDV / Assistance à la mise en place Improving domestic revenue Individual de la gestion des niveaux de IDA / 57640 mobilization and public Post Consultant Limited 32,000.00 27,660.75 Signed 2018-12-26 2018-11-21 2018-12-31 2018-10-08 2019-01-21 2018-11-28 2019-02-25 2018-12-05 2019-03-27 service (SLM) et d'un centre de expenditure management Selection service BF-PGEPC-92962-CS-INDV / Improving domestic revenue Individual Assistance à la mise en place IDA / 57640 mobilization and public Post Consultant Limited 60,000.00 52,190.10 Signed 2018-12-26 2018-10-05 2018-12-31 2018-11-08 2019-01-21 2018-11-26 2019-02-25 2018-12-10 2019-03-27 de l'intranet du MINEFID expenditure management Selection BF-PGEPC-92965-CS-INDV / Service d'un consultant Strengthening Citizen Individual international chargé d'assurer IDA / 57640 Engagement and Post Consultant Limited 27,000.00 26,838.00 Signed 2018-12-26 2018-10-16 2018-12-31 2018-11-12 2019-01-21 2018-11-13 2019-02-25 2018-12-19 2019-03-27 une communication lors de Accountability Selection l'atelier national sur la bonne gouvernance au Burkina Faso. BF-PGEPC-100222-CS-INDV Strengthening Citizen Individual / Mise en place du site web IDA / 57640 Engagement and Post Consultant Limited 13,000.00 6,970.67 Completed 2019-04-15 2019-03-19 2019-04-20 2019-03-22 2019-05-11 2019-04-23 2019-06-15 2019-06-07 2019-08-16 2019-10-30 institutionnel du CIFOEB Accountability Selection BF-PGEPC-100217-CS-INDV Strengthening Citizen Individual / Expert en gouvernance pour IDA / 57640 Engagement and Post Consultant Limited 52,200.00 54,421.63 Signed 2019-02-15 2019-01-10 2019-02-20 2019-01-16 2019-03-13 2019-01-30 2019-04-17 2019-02-15 2020-03-17 la mise en œuvre de la Accountability Selection composante 1 du PGEPC BF-PGEPC-100225-CS-INDV Strengthening Citizen Individual / Expert en gouvernance pour IDA / 57640 Engagement and Post Consultant Limited 52,200.00 43,050.20 Signed 2019-02-25 2019-03-05 2019-03-02 2019-03-11 2019-03-23 2019-04-03 2019-04-27 2019-05-08 2020-03-24 la mise en œuvre de la sous- Accountability Selection composante 1,2 du PGEPC BF-PGEPC-100199-CS-CDS / Service de consultant pour former les informaticiens du Improving domestic revenue MI/MENA/MS sur IDA / 57640 mobilization and public Post Direct Selection Direct 35,000.00 30,595.98 Signed 2019-02-20 2019-01-25 2019-03-02 2019-05-16 2019-05-06 2019-09-05 2019-05-31 l'administration du logiciel de expenditure management suivi des délais de passation des MP BF-PGEPC-100245-CS-INDV / Service de consultant Improving domestic revenue Individual individuel pour la mise en Pending IDA / 57640 mobilization and public Post Consultant Limited 27,022.00 0.00 2019-06-25 2019-06-30 2019-07-21 2019-08-25 2019-10-24 place d'une liaison sécurisée Implementation expenditure management Selection avec les sources détentrices d'informations BF-PGEPC-100236-CS-INDV / Service d'un expert en Improving domestic revenue Individual système d'informations pour IDA / 57640 mobilization and public Post Consultant Limited 80,000.00 67,019.23 Signed 2019-02-28 2019-02-26 2019-03-05 2019-03-11 2019-03-26 2019-04-16 2019-04-30 2019-05-03 2020-03-30 appuyer la mise en œuvre du expenditure management Selection projet BF-PGEPC-100234-CS-INDV Individual / Service d'un expert en IDA / 57640 Rapid Response Facility Post Consultant Limited 52,200.00 46,107.22 Signed 2019-02-28 2019-02-26 2019-03-05 2019-04-30 2019-03-26 2019-05-20 2019-04-30 2019-06-24 2020-03-30 finances publiques Selection Page 10 BF-PGEPC-100246-CS-INDV / Service de consultant pour Individual mettre en place le site web du IDA / 57640 Project Management Support Post Consultant Limited 13,000.00 9,864.91 Signed 2019-06-30 2019-02-28 2019-07-05 2019-03-15 2019-07-26 2019-04-10 2019-08-30 2019-05-15 2019-10-30 PGEPC et des réseaux sociaux Selection (Facebook-Twitter-You Tube) BF-PGEPC-100251-CS-INDV / Renforcer les capacités du Strengthening Citizen Individual Pending personnel du département IDA / 57640 Engagement and Post Consultant Limited 60,000.00 0.00 2019-03-15 2019-03-20 2019-04-10 2019-05-15 2019-07-05 Implementation des déclarations d’intérêt et Accountability Selection de patrimoine de l’ASCE-LC BF-PGEPC-100241-CS-INDV / Service d'un consultant individuel pour une assistance Improving domestic revenue Individual à la mise en place d'une IDA / 57640 mobilization and public Post Consultant Limited 86,000.00 0.00 Canceled 2019-02-28 2019-03-05 2019-03-26 2019-04-30 2019-06-30 entreprise service BUS (ESB) au expenditure management Selection profit des services informatiques du MINEFID BF-PGEPC-100244-CS-INDV / Service d'un consultant Strengthening Citizen Individual individuel pour appuyer IDA / 57640 Engagement and Post Consultant Limited 12,000.00 0.00 Canceled 2019-04-29 2019-05-04 2019-05-25 2019-06-29 2019-08-26 l'équipe technique du CIFOEB Accountability Selection pour la production du rapport sur la transparence budgétaire BF-PGEPC-116570-CS-CDS / Service de consultant pour l'hébergement, l'assistance aux utilisateurs, la formation Strengthening Citizen des informaticiens et la IDA / 57640 Engagement and Post Direct Selection Direct 11,000.00 9,030.02 Signed 2019-05-30 2019-05-15 2019-06-09 2019-09-26 2019-08-13 2019-10-23 2020-08-12 maintenance de l'application Accountability de suivi des conventions des maîtrises d'ouvrage Déléguée (COMOD) BF-PGEPC-124762-CS-INDV Improving domestic revenue Individual / Service d'un Lead IDA / 57640 mobilization and public Post Consultant Limited 390,000.00 0.00 Under Review 2019-07-31 2019-08-05 2019-08-26 2019-09-30 2021-09-30 Developpeur au profit de la expenditure management Selection DGSI BF-PGEPC-124772-CS-INDV Improving domestic revenue Individual Under / Service d'un scrum master IDA / 57640 mobilization and public Post Consultant Limited 122,000.00 0.00 2019-07-31 2020-08-24 2019-08-05 2019-08-26 2019-09-30 2020-09-30 Implementation au profit de la DGSI expenditure management Selection BF-PGEPC-150568-CS-INDV / Service d’un consultant individuel en qualité de développeur FRONT END pour Improving domestic revenue Individual renforcer l’équipe de IDA / 57640 mobilization and public Post Consultant Limited 60,000.00 36,053.86 Signed 2020-01-27 2019-09-10 2020-02-01 2019-12-13 2020-02-22 2019-12-23 2020-03-28 2020-01-15 2020-04-28 développement dans le cadre expenditure management Selection de la réalisation du système intégré de gestion des finances publiques N@FOLO BF-PGEPC-150573-CS-INDV / Service d’un consultant individuel en qualité de développeur BACK END N°1 Improving domestic revenue Individual pour renforcer l’équipe de IDA / 57640 mobilization and public Post Consultant Limited 72,000.00 40,059.84 Signed 2020-01-27 2019-09-10 2020-02-01 2019-12-13 2020-02-22 2019-12-23 2020-03-28 2020-01-15 2020-09-24 développement dans le cadre expenditure management Selection de la réalisation du système intégré de gestion des finances publiques N@FOLO BF-PGEPC-150578-CS-INDV / Service d’un consultant individuel en qualité de développeur BACK END N°2 Improving domestic revenue Individual pour renforcer l’équipe de IDA / 57640 mobilization and public Post Consultant Limited 72,000.00 40,059.84 Signed 2020-01-30 2019-09-10 2020-02-04 2019-12-13 2020-02-25 2019-12-23 2020-03-31 2020-01-15 2020-09-27 développement dans le cadre expenditure management Selection de la réalisation du système intégré de gestion des finances publiques N@FOLO BF-PGEPC-159448-CS-INDV / Service d'un consultant individuel chargé de l'élaboration d'un rapport de Improving domestic revenue Individual préparation pour faciliter la IDA / 57640 mobilization and public Post Consultant Direct 100,000.00 71,160.00 Signed 2020-03-02 2020-02-27 2020-03-12 2020-04-10 2020-04-02 2020-04-14 2020-05-07 2020-05-12 2020-06-20 stratégie d’accompagnement expenditure management Selection la Banque à la mise en œuvre des marchés publics électroniques (e-GP) au Burkina Faso BF-PGEPC-165580-CS-INDV / Service d’un expert en gouvernance chargé de la Strengthening Citizen Individual mise en œuvre de la IDA / 57640 Engagement and Post Consultant Limited 34,000.00 31,155.10 Signed 2020-03-30 2020-03-25 2020-04-04 2020-04-10 2020-04-25 2020-05-07 2020-05-30 2020-06-04 2021-05-30 composante 1 pour renforcer Accountability Selection la participation citoyenne et la redevabilité au profit du PGEPC BF-PGEPC-183033-CS-INDV Strengthening Citizen Individual / Expert en gouvernance pour IDA / 57640 Engagement and Post Consultant Limited 52,200.00 41,009.81 Signed 2020-07-30 2020-09-01 2020-08-04 2020-09-15 2020-08-25 2020-10-06 2020-09-29 2020-10-15 2021-09-29 la mise en œuvre de la Accountability Selection composante 1.2 du PGEPC BF-PGEPC-183035-CS-INDV Strengthening Citizen Individual / Service d'un consultant IDA / 57640 Engagement and Post Consultant Limited 20,000.00 18,064.70 Signed 2020-08-10 2020-09-24 2020-08-15 2020-10-14 2020-09-05 2020-11-27 2020-10-10 2020-12-17 2020-11-25 individuel pour élaborer un Accountability Selection plan de formation des USC BF-PGEPC-183041-CS-INDV Improving domestic revenue Individual / Service d'un consultant IDA / 57640 mobilization and public Post Consultant Limited 16,480.00 14,546.56 Signed 2020-09-20 2020-08-24 2020-09-25 2020-09-21 2020-10-16 2020-11-10 2020-11-20 2020-11-23 2021-05-19 individuel pour rénover le site expenditure management Selection web de la DGSI BF-PGEPC-183012-CS-INDV Improving domestic revenue Individual / Expert en système Under IDA / 57640 mobilization and public Post Consultant Limited 30,000.00 0.00 2020-07-30 2020-09-01 2020-08-04 2020-08-25 2020-09-29 2021-03-28 d'informations pour appuyer Implementation expenditure management Selection la mise en œuvre du PGEPC Page 11 BF-PGEPC-183029-CS-CDS / Improving domestic revenue Service d'un cabinet pour la IDA / 57640 mobilization and public Post Direct Selection Direct 160,000.00 0.00 Canceled 2020-08-15 2020-09-01 2020-08-25 2020-10-19 2020-12-18 maintenance de la plateforme expenditure management e-SINTAX BF-PGEPC-189982-CS-INDV / Service d'un consultant Improving domestic revenue Individual individuel en qualité de IDA / 57640 mobilization and public Post Consultant Limited 36,000.00 33,374.88 Signed 2020-09-15 2020-09-07 2020-09-20 2020-09-15 2020-10-11 2020-09-30 2020-11-15 2020-11-16 2021-05-14 développeur Back End N°3 expenditure management Selection pour renforcer l'équipe de développement de N@FOLO BF-PGEPC-189985-CS-INDV / Service d'un consultant Improving domestic revenue Individual individuel en qualité de IDA / 57640 mobilization and public Post Consultant Limited 36,000.00 33,374.88 Signed 2020-09-15 2020-09-07 2020-09-20 2020-09-15 2020-10-11 2020-09-30 2020-11-15 2020-11-16 2021-05-14 développeur Front End N°2 expenditure management Selection pour renforcer l'équipe de développement de N@FOLO. BF-PGEPC-196692-CS-CDS / Service d'un cabinet pour la Strengthening Citizen maintenance de la plateforme IDA / 57640 Engagement and Post Direct Selection Direct 70,800.00 55,791.67 Signed 2020-09-30 2020-09-30 2020-10-10 2020-10-01 2020-11-24 2020-12-14 2021-11-24 de déclaration d’intérêt et de Accountability patrimoine de l'ASCE-LC BF-PGEPC-203044-CS-CDS / Improving domestic revenue Service d'un cabinet pour la IDA / 57640 mobilization and public Post Direct Selection Direct 160,000.00 147,972.80 Signed 2020-11-04 2020-09-28 2020-11-14 2020-10-01 2021-01-08 2020-11-16 2021-03-09 maintenance de la plateforme expenditure management e-SINTAX au profit de la DGI BF-PGEPC-183031-CS-INDV Individual / Expert en finances IDA / 57640 Rapid Response Facility Post Consultant Limited 52,200.00 0.00 Canceled 2020-07-31 2020-08-05 2020-08-26 2020-09-30 2021-09-30 publiques Selection BF-PGEPC-217070-CS-INDV / Service d’un consultant individuel pour la formation Strengthening Citizen Individual du personnel IT de l’ASCE-LC Under IDA / 57640 Engagement and Post Consultant Limited 17,340.00 0.00 2021-03-15 2021-02-19 2021-03-20 2021-04-10 2021-04-30 2021-06-30 sur la gouvernance des Implementation Accountability Selection systèmes d’information et en Network Security Expert (NSE 4) BF-PGEPC-217069-CS-CDS / Mise en oeuvre de la carte de Strengthening Citizen Under pointage communautaire dans IDA / 57640 Engagement and Post Direct Selection Direct 100,000.00 0.00 2021-02-21 2021-02-22 2021-03-03 2021-04-15 2021-11-30 Implementation les secteurs de l’éducation et Accountability la santé BF-PGEPC-217121-CS-INDV / Service d’un Consultant Strengthening Citizen Individual pour la réalisation des audits Under IDA / 57640 Engagement and Post Consultant Limited 50,000.00 0.00 2021-04-25 2021-03-29 2021-04-30 2021-05-21 2021-06-15 2021-08-16 de performances des trois Implementation Accountability Selection programmes budgétaires des ministères au profit de l'IGF BF-PGEPC-217138-CS-INDV Strengthening Citizen Individual / Service d’un expert en Under IDA / 57640 Engagement and Post Consultant Limited 40,000.00 0.00 2021-02-27 2021-03-29 2021-03-04 2021-03-25 2021-04-20 2021-11-30 gouvernance pour la sous- Implementation Accountability Selection composante1.2 BF-PGEPC-217050-CS-INDV Strengthening Citizen Individual Pending / Service d'un expert en IDA / 57640 Engagement and Post Consultant Limited 20,000.00 0.00 2021-02-20 2021-02-25 2021-03-18 2021-04-22 2021-10-19 Implementation Gouverannce Accountability Selection BF-PGEPC-217118-CS-CDS / Mise à niveau de la plateforme eSINTAX pour l’extension des modes de paiement aux Improving domestic revenue cartes bancaires, Under IDA / 57640 mobilization and public Post Direct Selection Direct 247,800.00 0.00 2021-02-18 2021-02-19 2021-02-28 2021-04-23 2021-07-23 l’amélioration du module DGI- Implementation expenditure management Cash et la dématérialisation de la procédure d’enregistrement des actes et contrats soumis à l’enregistrement BF-PGEPC-217110-CS-CDS / Service de consultants pour l’implémentation de trente (30) nouveaux indicateurs Improving domestic revenue (maintenance évolutive) et Under IDA / 57640 mobilization and public Post Direct Selection Direct 150,000.00 0.00 2021-02-26 2021-02-19 2021-03-15 2021-04-20 2021-07-30 assurer une maintenance Implementation expenditure management corrective pendant dix (10) mois et une formation d’analystes pour le système décisionnel BF-PGEPC-217107-CS-INDV / Service d’un consultant individuel pour la migration des bases de données Oracle Improving domestic revenue Individual Under vers PostgreSQL, le IDA / 57640 mobilization and public Post Consultant Limited 56,000.00 0.00 2021-02-15 2021-03-12 2021-02-25 2021-03-18 2021-04-15 2021-06-15 Implementation déploiement généralisé sur les expenditure management Selection serveurs de production et la formation des équipes techniques/DGSI BF-PGEPC-217141-CS-INDV Improving domestic revenue Individual Under / Service d’un expert IT pour IDA / 57640 mobilization and public Post Consultant Limited 30,000.00 0.00 2021-02-20 2021-03-29 2021-02-25 2021-03-18 2021-04-15 2021-11-30 Implementation le PGEPC expenditure management Selection BF-PGEPC-217133-CS-INDV / Service d’un consultant individuel pour une assistance Improving domestic revenue Individual technique dans le cadre du Under IDA / 57640 mobilization and public Post Consultant Limited 142,000.00 0.00 2021-03-30 2021-02-19 2021-04-04 2021-04-30 2021-05-28 2021-07-30 développement de modules Implementation expenditure management Selection complémentaires à intégrer au système d’information de l’Administration des Douanes BF-PGEPC-217142-CS-INDV / Service d'un développeur Improving domestic revenue Individual FRONT END et de deux (02) Under IDA / 57640 mobilization and public Post Consultant Limited 108,000.00 0.00 2021-02-26 2021-03-12 2021-03-03 2021-03-24 2021-04-16 2021-11-30 développeurs BACK END pour Implementation expenditure management Selection renforcer l'équipe de développement en 2021 Page 12 BF-PGEPC-219967-CS-INDV / Service d'un consultant individuel pour la mise en Improving domestic revenue Individual Under place d’un cluster de serveurs IDA / 57640 mobilization and public Post Consultant Limited 106,000.00 0.00 2021-04-20 2021-02-22 2021-04-25 2021-05-16 2021-06-15 2021-08-16 Implementation d’applications et d’un cluster expenditure management Selection de bases de données en redondance/DGI BF-PGEPC-220416-CS-INDV / Service de consultant individuel pour assurer la formation, le coaching, le suivi et l’accompagnement Strengthening Citizen Individual Under des contrôleurs d’Etat et des IDA / 57640 Engagement and Post Consultant Limited 285,000.00 0.00 2021-03-30 2021-03-29 2021-04-04 2021-04-25 2021-05-21 2021-08-20 Implementation ITS dans l’appropriation des Accountability Selection normes et manuels de procédures d’audit interne et d’audit de performance actualisés au profit BF-PGEPC-227887-CS-INDV / Recrutement d'un consultant individuel pour évaluer les avantages et les inconvénients Improving domestic revenue Individual de l’option de sous-traitance Under IDA / 57640 mobilization and public Post Consultant Limited 50,000.00 0.00 2021-04-06 2021-04-14 2021-04-11 2021-05-02 2021-05-31 2021-08-30 de l’activité bancaire à des Implementation expenditure management Selection banques commerciales sélectionnées sur une base compétitive au profit de la DGTCP BF-PGEPC-235170-CS-INDV / Service d'un consultant Improving domestic revenue Individual individuel chargé de Under IDA / 57640 mobilization and public Post Consultant Limited 180,000.00 0.00 2021-05-20 2021-05-25 2021-05-25 2021-06-15 2021-07-15 2021-10-15 l’élaboration d'une stratégie Implementation expenditure management Selection nationale des achats durables au profit de l'ARCOP BF-PGEPC-238163-CS-INDV / Service d’un consultant individuel pour une étude évaluative des projets de Improving domestic revenue Individual dématérialisation/digitalisatio Under IDA / 57640 mobilization and public Post Consultant Limited 100,000.00 0.00 2021-06-10 2021-06-14 2021-06-15 2021-07-06 2021-07-30 2021-10-30 n des procédures au sein des Implementation expenditure management Selection régies financières au profit du Bureau d'Appui aux Évaluations Stratégiques du MINEFID BF-PGEPC-238166-CS-INDV / Service d’un consultant individuel pour évaluer les performances de la dématérialisation des Improving domestic revenue Individual procédures de Under IDA / 57640 mobilization and public Post Consultant Limited 90,000.00 0.00 2021-06-10 2021-06-14 2021-06-15 2021-07-06 2021-07-30 2021-09-30 mobilisation/recouvrement Implementation expenditure management Selection des ressources au sein des régies financières au profit du Bureau d'Appui aux Évaluations Stratégiques (BAES)/MINEFID BF-PGEPC-238159-CS-CDS / Service d’un cabinet Improving domestic revenue international pour l’audit de la Under IDA / 57640 mobilization and public Post Direct Selection Direct 440,000.00 0.00 2021-06-18 2021-06-23 2021-06-28 2021-07-28 2021-11-25 gestion de l’activité minière Implementation expenditure management par l’Administration du Burkina Faso Page 13 Procurement Plan (P 155350) Sindh Resilience Project I. General 1. Bank’s approval Date of the procurement Plan [Original: February 28, 2016]: Revision of Updated Procurement Plan, May 2017 ] 2. Date of General Procurement Notice: August 2016 3. Period covered by this procurement plan: The procurement period of project covered from year May 2017 to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued by SID 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 July 9, 2010 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Pakistan : Sindh Resilience Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2016-11-03 2021-05-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155350 GPN Date: 2016-10-28 Project Name: Sindh Resilience Project Loan / Credit No: IDA / 58880, IDA / 67940 Sindh Irrigation Department Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SID-2961-CW-RFP / Providing stone pitching between BU Bund from mile 13/3 to 35/3 and indo bund Improving Infrastructure and Single Stage - One 5,024,100.3 2017-10- IDA / 58880 Prior Request for Bids Open - International Signed 2016-11-25 2017-06-02 2016-12-09 2017-06-08 2017-01-23 2017-07-24 2017-02-22 2017-10-02 2017-04-07 2017-10-27 from mile 0/0 to 15/6 total Systems for Resilience Envelope 6 04 15 miles and 7 furlongs in Sakro Division Mirpursakro. (Baghar Circle Hyderabad). PK-SID-2963-CW-RFP / CONSTRUCTION OF BHANSAR Improving Infrastructure and Single Stage - One 2018-01- SMALL/RECHARGE DAM IN IDA / 58880 Post Request for Bids Open - National 0.00 Canceled 2017-03-01 2017-03-16 2017-04-27 2017-05-29 2017-07-12 Systems for Resilience Envelope 08 NAGARPARKAR AREA (THAR REGION) PK-SID-2964-CW-RFP / CONSTRUCTION OF SABUSAN Improving Infrastructure and Single Stage - One 2018-01- SMALL/RECHARGE DAM IN IDA / 58880 Post Request for Bids Open - National 0.00 Canceled 2017-03-01 2017-03-16 2017-04-27 2017-05-29 2017-07-12 Systems for Resilience Envelope 08 NAGARPARKAR AREA (THAR REGION) PK-SID-2965-CW-RFP / CONSTRUCTION OF SANKAR Improving Infrastructure and Single Stage - One 2018-01- SMALL/RECHARGE DAM IN IDA / 58880 Post Request for Bids Open - National 0.00 Canceled 2017-03-01 2017-03-16 2017-04-27 2017-05-29 2017-07-12 Systems for Resilience Envelope 08 NAGARPARKAR AREA (THAR REGION) PK-SID-2967-CW-RFP / CONSTRUCTION OF KONKAR Improving Infrastructure and Single Stage - One 2018-06- IDA / 58880 Post Request for Bids Open - National 0.00 Canceled 2017-08-01 2017-08-16 2017-09-27 2017-10-27 2017-12-08 RECHARGE/SMALL DAM IN Systems for Resilience Envelope 06 LOWER KOHISTAN PK-SID-2968-CW-RFP / CONSTRUCTION OF Improving Infrastructure and Single Stage - One 2018-06- KARMATIANI IDA / 58880 Post Request for Bids Open - National 0.00 Canceled 2017-08-01 2017-08-16 2017-09-27 2017-10-27 2017-12-08 Systems for Resilience Envelope 06 RECHARGE/SMALL DAM IN LOWER KOHISTAN PK-SID-2960-CW-RFP / Recoupment of stone Apron along S.H Bund mile 1/6 to 2/1 and Repair to damage stone pitching along S.H Bund Improving Infrastructure and Single Stage - One 1,042,222.8 2017-11- mile 1/0 to 3/0 (Different IDA / 58880 Prior Request for Bids Open - National Signed 2017-01-21 2017-06-29 2017-01-26 2017-07-07 2017-03-09 2017-08-07 2017-04-08 2017-09-21 2017-05-13 2017-10-16 Systems for Resilience Envelope 4 09 Reaches) and widening of S.H Bund from mile 0/4 to 3/2 in Kalri Baghar Division Thatta.(Baghar Circle Hyderabad). PK-SID-2962-CW-RFP / Stone pitching and Toe Wall along M.S Bund mile 29/2 to 29/5, 36/0 to 40/0, 45/0 to Improving Infrastructure and Single Stage - One 2017-11- 58/2, Raising and IDA / 58880 Prior Request for Bids Open - National 0.00 Canceled 2017-01-21 2017-06-29 2017-01-26 2017-03-09 2017-04-08 2017-05-13 Systems for Resilience Envelope 09 strengthening along M.S Bund mile 55/4 to 58/2 in Lower Pinyari Division Sujawal. (Pinyari Circle Hyderabad). PK-SID-20260-CW-RFB / Providing Stone Pitching along Under M.S Bund mile 29/2 to 29/5, Improving Infrastructure and Single Stage - One 3,557,787.4 2018-03- IDA / 58880 Post Request for Bids Open - National Implementat 2017-07-21 2017-05-20 2017-07-21 2017-08-07 2017-08-21 2017-08-07 2017-08-28 2017-09-22 2017-10-02 2017-10-17 36/0 to 40/0 to 58/2 and Systems for Resilience Envelope 6 31 ion Raising and Strengthening of M.S Bund mile 55/4 to 58/2. PK-SID-29036-CW-RFB / Providing Stone Pitching along Improving Infrastructure and Single Stage - One 4,146,864.0 2018-11- PB Bund from mile 0/0 to 8/5 IDA / 58880 Post Request for Bids Open - National Signed 2017-09-19 2018-04-08 2017-09-22 2018-04-10 2017-10-23 2018-05-10 2017-10-30 2018-06-04 2017-11-06 2018-07-05 Systems for Resilience Envelope 3 05 and 11/4 to 15/0 in Kalri Baghar Division Thatta. PK-SID-29042-CW-RFB / Earthwork & Repair Damaged Stone Pitching along up Improving Infrastructure and Single Stage - One 2018-11- 2019- Stream left side guide bund IDA / 58880 Post Request for Bids Open - National 791,521.35 Completed 2017-09-19 2018-04-08 2017-09-22 2018-04-10 2017-10-23 2018-05-10 2017-10-30 2018-06-04 2017-11-06 2018-07-09 Systems for Resilience Envelope 05 04-02 from RD 0+000 to RD 5+700 in Kotri Barrage Division Jamshoro. PK-SID-29051-CW-RFB / Providing Stone Pitching along MS Bund from mile 0/0 to Improving Infrastructure and Single Stage - One 6,072,151.7 2018-11- IDA / 58880 Post Request for Bids Open - National Signed 2017-09-19 2018-04-08 2017-09-22 2018-04-10 2017-10-23 2018-05-10 2017-10-30 2018-06-04 2017-11-06 2018-07-05 14/0 and 22/0 to 24/7 in Systems for Resilience Envelope 7 05 Upper Pinyari Division, Hyderabad PK-SID-29055-CW-RFB / Providing Stone Pitching along Improving Infrastructure and Single Stage - One 2018-11- BU Bund from mile 3/0 to 5/0 IDA / 58880 Post Request for Bids Open - National 969,963.22 Signed 2017-09-19 2018-04-09 2017-09-22 2018-04-10 2017-10-23 2018-05-10 2017-10-30 2018-06-04 2017-11-06 2018-07-05 Systems for Resilience Envelope 05 in Kalri Baghar Division Thatta. Page 1 PK-SID-29086-CW-RFB / Providing Stone Pitching along Kuka Link Bund 0/0 to 20/6, Raising and Strengthening Improving Infrastructure and Single Stage - One 4,924,242.9 2018-11- along Kuka Wari Bund mile IDA / 58880 Post Request for Bids Open - National Signed 2017-09-19 2018-04-08 2017-09-22 2018-04-10 2017-10-23 2018-05-10 2017-10-30 2018-06-04 2017-11-06 2018-07-04 Systems for Resilience Envelope 4 05 3/6 to7/4 and Kuka Wari Retarded Bund mile 0/0 to 3/0 in Lower Pinyari Division Sujawal. PK-SID-37707-CW-RFB / Recoupment of Damaged Stone Pitching & Earth Work along SM Bund from mile Improving Infrastructure and Single Stage - One 2019-04- IDA / 58880 Post Request for Bids Open - National 0.00 Canceled 2018-01-16 2018-01-19 2018-02-21 2018-03-07 2018-04-11 123/0 to 172/0 (Different Systems for Resilience Envelope 10 Reaches) in Hala Irrigation Division Hala. (95 percent from counterpart funding). PK-SID-69711-CW-RFB / Construction of 2Nos: Improving Infrastructure and Single Stage - One 3,757,015.5 2019-11- Small/Recharge Dams in IDA / 58880 Post Request for Bids Open - National Signed 2018-07-16 2018-07-18 2018-07-19 2018-07-19 2018-08-20 2018-08-27 2018-09-19 2018-09-10 2018-11-02 2018-10-01 Systems for Resilience Envelope 9 01 Lower Khoistan Malir namely Karmatiani and Konkar. PK-SID-2969-CW-RFP / CONSTRUCTION OF ARIPIR Improving Infrastructure and Single Stage - One 2,137,362.2 2019-11- IDA / 58880 Post Request for Bids Open - National Signed 2018-07-16 2018-07-18 2018-07-19 2018-07-19 2018-08-20 2018-08-27 2018-09-19 2018-09-13 2018-11-02 2018-10-03 RECHARGE/SMALL DAM IN Systems for Resilience Envelope 9 01 LOWER KOHISTAN. PK-SID-2966-CW-RFP / CONSTRUCTION OF JUNG Improving Infrastructure and Single Stage - One 3,332,375.0 2019-11- IDA / 58880 Post Request for Bids Open - National Signed 2018-07-16 2018-07-18 2018-07-19 2018-07-19 2018-08-20 2018-08-27 2018-09-19 2018-09-10 2018-11-02 2018-10-03 SHAHI RECHARGE/SMALL DAM Systems for Resilience Envelope 8 01 IN LOWER KOHISTAN PK-SID-69710-CW-RFB / Construction of 2Nos: Improving Infrastructure and Single Stage - One 7,044,375.2 2019-11- Small/Recharge Dams in IDA / 58880 Post Request for Bids Open - International Signed 2018-07-16 2018-07-18 2018-07-19 2018-07-20 2018-09-03 2018-09-07 2018-10-03 2018-10-22 2018-11-16 2018-11-26 Systems for Resilience Envelope 8 15 Tharparkar namely Sabusan and Sankar. PK-SID-83933-CW-RFB / Recoupment of Damaged Stone Pitching & Earth Work along SM Bund from mile 123/0 to 172/0 (Different Improving Infrastructure and Single Stage - One 1,063,696.5 2019-10- IDA / 58880 Post Request for Bids Open - National Signed 2018-10-29 2018-12-26 2018-11-01 2019-01-03 2018-12-03 2019-02-04 2019-01-02 2019-06-28 2019-01-30 2019-07-23 Reaches) in Hala Irrigation Systems for Resilience Envelope 1 27 Division Hala. (100 percent payment will be made counterpart funding through Government of Sindh). PK-SID-93082-CW-RFB / Package No: 14 Construction Improving Infrastructure and Single Stage - One 2,950,660.0 2020-03- IDA / 58880 Post Request for Bids Open - National Signed 2018-12-28 2019-01-02 2018-12-31 2019-01-03 2019-01-30 2019-02-04 2019-03-01 2019-03-27 2019-03-29 2019-04-08 of Bhansar/ Rathi Small Systems for Resilience Envelope 1 27 storage Dam. PK-SID-93083-CW-RFB / Package No: 15 Lot No. 1 Construction of Naing-II Small/Recharge Dam. Improving Infrastructure and Single Stage - One 6,109,757.4 2020-03- IDA / 58880 Post Request for Bids Open - National Signed 2018-12-28 2019-01-02 2018-12-31 2019-01-03 2019-01-30 2019-02-04 2019-03-01 2019-03-05 2019-03-29 2019-03-29 Lot No. 2 Systems for Resilience Envelope 1 27 Construction of Gabol and Dhal Dhoro-II Small/Recharge Dams. PK-SID-93084-CW-RFB / Package No: 16 Lot No. 1 Construction of Tikho-II and Improving Infrastructure and Single Stage - One 5,460,536.9 2020-03- Sureshi Small/Recharge Dams. IDA / 58880 Post Request for Bids Open - National Signed 2018-12-28 2019-01-02 2018-12-31 2019-01-03 2019-01-30 2019-02-04 2019-03-01 2019-03-01 2019-03-29 2019-04-24 Systems for Resilience Envelope 5 27 Lot No. 2 Construction of Upper Mole-II Small/Recharge Dam. PK-SID-93086-CW-RFB / Package No: 17 Construction Improving Infrastructure and Single Stage - One 3,549,284.4 2020-03- IDA / 58880 Post Request for Bids Open - National Signed 2018-12-28 2019-01-02 2018-12-31 2019-01-03 2019-01-30 2019-02-04 2019-03-01 2019-05-24 2019-03-29 2019-06-13 of Nali and Qasim Tok Systems for Resilience Envelope 2 27 Small/Recharge Dams. PK-SID-119972-CW-RFB / Package-I: Construction and Improving Infrastructure and Single Stage - One 1,135,510.3 2020-07- Rehabilitation of Laboratory IDA / 58880 Post Request for Bids Open - National Signed 2019-06-21 2019-07-01 2019-06-24 2019-07-08 2019-07-24 2019-08-09 2019-08-23 2019-09-05 2019-10-11 2019-10-24 Systems for Resilience Envelope 5 07 Building and Trays. 1 PK-SID-178002-CW-RFB / Construction of Jaganwari Improving Infrastructure and Single Stage - One 1,785,852.7 2021-10- IDA / 58880 Post Request for Bids Open - National Signed 2020-07-01 2020-09-10 2020-07-02 2020-09-10 2020-08-03 2020-10-15 2020-09-02 2021-03-18 2020-10-14 2021-04-14 Small/Recharge Dam in Systems for Resilience Envelope 4 13 Khairpur Mirs'. PK-SID-178003-CW-RFB / Construction of Tungwari Improving Infrastructure and Single Stage - One 2,032,490.0 2021-10- IDA / 58880 Post Request for Bids Open - National Signed 2020-07-01 2020-09-10 2020-07-02 2020-09-10 2020-08-03 2020-10-15 2020-09-02 2021-03-18 2020-10-14 2021-04-20 Small/Recharge Dam in Systems for Resilience Envelope 7 13 Khairpur Mirs'. PK-SID-178008-CW-RFB / Under Construction of Darig Improving Infrastructure and Single Stage - One 2,075,865.1 2021-10- IDA / 58880 Post Request for Bids Open - National Implementat 2020-07-01 2020-09-10 2020-07-02 2020-09-10 2020-08-03 2020-10-15 2020-09-02 2021-04-28 2020-10-14 Small/Recharge Dam in Systems for Resilience Envelope 8 13 ion Khairpur Mirs'. PK-SID-178009-CW-RFB / Under Construction of Samlee Improving Infrastructure and Single Stage - One 3,431,427.1 2021-10- IDA / 58880 Post Request for Bids Open - National Implementat 2020-07-01 2020-09-10 2020-07-02 2020-09-10 2020-08-03 2020-10-15 2020-09-02 2021-03-18 2020-10-14 Small/Recharge Dam in Systems for Resilience Envelope 5 13 ion Nagarparkar (Thar Region). PK-SID-178010-CW-RFB / Under Construction of Paro Jo Improving Infrastructure and Single Stage - One 2,288,220.0 2021-10- IDA / 58880 Post Request for Bids Open - National Implementat 2020-07-01 2020-09-10 2020-07-02 2020-09-10 2020-08-03 2020-10-15 2020-09-02 2021-03-18 2020-10-14 Wandhio Small/Recharge Dam Systems for Resilience Envelope 3 13 ion in Nagarparkar (Thar Region). PK-SID-178011-CW-RFB / Under Construction of Sehriyoon Improving Infrastructure and Single Stage - One 2,466,385.3 2021-10- IDA / 58880 Post Request for Bids Open - National Implementat 2020-07-01 2020-09-10 2020-07-02 2020-09-10 2020-08-03 2020-10-15 2020-09-02 2021-03-18 2020-10-14 Small/Recharge Dam in Systems for Resilience Envelope 2 13 ion Nagarparkar (Thar Region). Page 2 PK-SID-182665-CW-RFB / Reconstruction of Soil Improving Infrastructure and Single Stage - One 2021-10- IDA / 58880 Post Request for Bids Open - National 310,844.81 Signed 2020-07-01 2020-07-17 2020-07-03 2020-07-17 2020-08-02 2020-08-19 2020-09-01 2020-11-02 2020-10-06 2020-12-08 Mechanics Laboratory and Systems for Resilience Envelope 05 Office Building at Karachi. PK-SID-220119-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF BHATTA IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 SIRO DAM IN NAGARPARKAR. ion PK-SID-220128-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF SOHRIO IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 WAH DAM IN NAGARPARKAR. ion PK-SID-220131-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF NAMARO IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 DAM IN NAGARPARKAR. ion PK-SID-220132-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF VIAKASAR IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 DAM IN NAGARPARKAR. ion PK-SID-220136-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF GORDHRO- IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 2 DAM IN NAGARPARKAR. ion PK-SID-220140-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF SUDRAN IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 DAM IN NAGARPARKAR. ion PK-SID-220141-CW-RFB / Under CONSTRUCTION OF ADHIGAM- Improving Infrastructure and Single Stage - One 2022-06- IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 SYED ALAM DAM IN Systems for Resilience Envelope 08 ion NAGARPARKAR. PK-SID-220143-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF LAYARI-1 IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 DAM IN NAGARPARKAR. ion PK-SID-220144-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF JHANJHOO IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 DAM IN NAGARPARKAR. ion PK-SID-220145-CW-RFB / Under Improving Infrastructure and Single Stage - One 2022-06- CONSTRUCTION OF PATHAR IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 Systems for Resilience Envelope 08 DAM IN NAGARPARKAR. ion PK-SID-220147-CW-RFB / Under CONSTRUCTION OF TARGAAM Improving Infrastructure and Single Stage - One 2022-06- IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-02-17 2021-02-19 2021-02-22 2021-02-26 2021-03-26 2021-04-26 2021-06-09 BUDHESAR DAM IN Systems for Resilience Envelope 08 ion NAGARPARKAR. Request for PK-SID-178000-CW-RFB / Bids - Small Construction of Sangchat Jo Improving Infrastructure and Single Stage - One 2022-09- IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Canceled 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Tarr Small/Recharge Dam in Systems for Resilience Envelope 10 envelope Lower Kohistan. process) PK-SID-177999-CW-RFB / Package No: 04 Lot No. 1 Construction of Request for Gurrand Small/ Recharge Dam Bids - Small Under Improving Infrastructure and Single Stage - One 2022-09- in Lower Kohistan. IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-31 2021-05-31 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 Lot No. 2 Construction of envelope ion Sangchat Jo Tarr Small/ process) Recharge Dam in Lower Kohistan. PK-SID-235601-CW-RFB / Package No: 01 Lot No. 1 Construction of Bandhaka Request for Dam in Central Kohistan. Bids - Small Under Improving Infrastructure and Single Stage - One 2022-09- IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-31 2021-05-31 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Lot No. 2 Systems for Resilience Envelope 10 envelope ion Construction of Baaro Dam in process) Central Kohistan. Lot No. 3 Construction of Chakhri Dam in Central Kohistan. Request for PK-SID-235602-CW-RFB / Bids - Small Improving Infrastructure and Single Stage - One 2022-09- Construction of Baaro Dam in IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Canceled 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 Central Kohistan. envelope process) Request for PK-SID-235603-CW-RFB / Bids - Small Improving Infrastructure and Single Stage - One 2022-09- Construction of Chakhri Dam IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Canceled 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 in Central Kohistan. envelope process) PK-SID-235604-CW-RFB / Package No: 02 Request for Lot No .1 Construction of Bids - Small Under Improving Infrastructure and Single Stage - One 2022-09- Churlo Dam in Central IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-31 2021-05-31 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 Kohistan. envelope ion Lot No. 2 Construction of process) Sunn-2 Dam in Central Kohistan. Request for PK-SID-235605-CW-RFB / Bids - Small Improving Infrastructure and Single Stage - One 2022-09- Construction of Sunn-2 Dam IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Canceled 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 in Central Kohistan. envelope process) Page 3 PK-SID-235606-CW-RFB / Package No: 03 Lot No. 1 Construction of Request for Gadap-2 Dam in Lower Bids - Small Under Kohistan. Improving Infrastructure and Single Stage - One 2022-09- IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-31 2021-05-31 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Lot No. 2 Construction of Lat- Systems for Resilience Envelope 10 envelope ion 2 Dam in Lower Kohistan. process) Lot No. 3 Construction of Khuda Bux Dam in Lower Kohistan. Request for PK-SID-235609-CW-RFB / Bids - Small Improving Infrastructure and Single Stage - One 2022-09- Construction of Khuda Bux IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Canceled 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 Dam in Lower Kohistan. envelope process) Request for PK-SID-235611-CW-RFB / Bids - Small Improving Infrastructure and Single Stage - One 2022-09- Construction of Lat-2 Dam in IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Canceled 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 Lower Kohistan. envelope process) Request for PK-SID-235613-CW-RFB / Bids - Small Improving Infrastructure and Single Stage - One 2022-09- Construction of Jharando-2 IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Canceled 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 Dam in Lower Kohistan. envelope process) PK-SID-235618-CW-RFB / Package No: 06 Request for Lot No. 1 Construction of Bids - Small Under Gorban Bhutti Dam in Lower Improving Infrastructure and Single Stage - One 2022-09- IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-31 2021-05-31 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Kohistan. Systems for Resilience Envelope 10 envelope ion Lot No. 2Construction of process) Dahri Sharif Dam in Lower Kohistan. Request for PK-SID-235624-CW-RFB / Bids - Small Improving Infrastructure and Single Stage - One 2022-09- Construction of Dahri Sharif IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Canceled 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 Dam in Lower Kohistan. envelope process) PK-SID-235630-CW-RFB / Package No: 05 Request for Lot No. 1 Construction of Bids - Small Under Jharando-1 Dam in Lower Improving Infrastructure and Single Stage - One 2022-09- IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-31 2021-05-31 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Kohistan. Systems for Resilience Envelope 10 envelope ion Lot No. 2 Construction of process) Jharando-2 Dam in Lower Kohistan. Request for PK-SID-235632-CW-RFB / Bids - Small Under Improving Infrastructure and Single Stage - One 2022-09- Construction of Gaib Janan IDA / 67940 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-31 2021-05-31 2021-05-31 2021-05-31 2021-07-01 2021-07-31 2021-09-11 Systems for Resilience Envelope 10 Dam in Lower Kohistan. envelope ion process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SID-2980-GO-RFQ / Improving Infrastructure and Request for Single Stage - One IDA / 58880 Prior Open - National 415,398.59 Completed 2016-11-12 2016-12-19 2017-01-07 2017-03-03 2017-07-06 2018-08-10 Vehciles Systems for Resilience Quotations Envelope PK-SID-2979-GO-RFQ / Improving Infrastructure and Request for Single Stage - One IDA / 58880 Post Open - National 47,647.27 Completed 2016-11-11 2017-01-06 2017-04-26 2017-07-05 2017-05-19 Office Furniture Systems for Resilience Quotations Envelope PK-SID-4707-GO-RFQ / Improving Infrastructure and Request for Single Stage - One IDA / 58880 Post Open - National 39,507.07 Completed 2016-12-24 2017-02-18 2017-04-26 2017-08-17 2017-05-19 Office Equipment Systems for Resilience Quotations Envelope PK-SID-2978-GO-RFB / Improving Infrastructure and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Canceled 2016-11-11 2017-01-06 2017-07-05 Office Equipment Systems for Resilience Quotations Envelope PK-SID-15281-GO-RFQ / Improving Infrastructure and Request for Single Stage - One Purchase of Motorcycles upto IDA / 58880 Post Open - National 1,206.08 Completed 2017-05-19 2017-06-12 2017-05-31 2017-07-27 2017-10-16 Systems for Resilience Quotations Envelope 70cc PK-SID-15303-GO-RFQ / Improving Infrastructure and Request for Single Stage - One Purchasing of stabilizer of 11 IDA / 58880 Post Open - National 1,744.00 Completed 2017-05-19 2017-06-12 2017-09-06 2017-07-27 2017-09-13 Systems for Resilience Quotations Envelope Nos: for office use PK-SID-16582-GO-RFQ / Supply, Installation Testing Improving Infrastructure and Request for Single Stage - One IDA / 58880 Post Open - National 12,561.52 Completed 2017-06-02 2017-10-26 2017-06-26 2017-11-16 2017-08-10 2017-12-08 and Commissioning Diesel Systems for Resilience Quotations Envelope Generator 30 to 37 KVA. PK-SID-21212-GO-RFQ / Improving Infrastructure and Request for Single Stage - One IDA / 58880 Post Open - National 17,121.64 Completed 2017-07-20 2017-08-14 2017-10-17 2017-09-28 2017-12-15 Video Conference System Systems for Resilience Quotations Envelope PK-SID-27863-GO-RFQ / Work Station, Chairs, Fixtures and partitions in prayer area. 1. Work Stations 08 Nos. Improving Infrastructure and Request for Single Stage - One 2. Hydraulic Chairs IDA / 58880 Post Open - National 7,528.57 Completed 2017-09-08 2017-10-26 2017-10-12 2017-11-10 2017-12-11 2017-11-18 Systems for Resilience Quotations Envelope 08 Nos. 3. Aluminum Door with Glass 01 No. 4. Fixture/Partitions 01 No. PK-SID-92972-GO-RFQ / Improving Infrastructure and Request for Single Stage - One Procurement of 2Nos: IDA / 58880 Post Open - National 994.49 Signed 2019-01-04 2019-02-18 2019-01-14 2019-03-04 2019-04-14 Systems for Resilience Quotations Envelope Motorcycles for Office use. PK-SID-118848-GO-RFB / Improving Infrastructure and Single Stage - One Hydraulic Laboratory IDA / 58880 Post Request for Bids Open - National 629,524.99 Signed 2019-06-20 2019-06-01 2019-06-27 2019-07-08 2019-07-29 2019-08-09 2019-08-28 2019-09-19 2019-09-30 2019-10-23 2020-03-28 Systems for Resilience Envelope Equipment. PK-SID-171224-GO-RFQ / Procurement of Health Safety Improving Infrastructure and Request for Single Stage - One Products and Disinfectant for IDA / 58880 Post Open - National 6,718.81 Signed 2020-04-30 2020-05-01 2020-05-18 2020-05-11 2020-06-17 Systems for Resilience Quotations Envelope Project Management Team (PMT). Page 4 PK-SID-189315-GO-RFQ / Improving Infrastructure and Request for Single Stage - One Procurement of I.T Equipment IDA / 58880 Post Open - National 9,058.76 Signed 2020-08-18 2020-08-31 2020-09-09 2020-10-20 2020-10-09 Systems for Resilience Quotations Envelope for office use. PK-SID-197646-GO-RFB / Procurement of Equipment for Improving Infrastructure and Single Stage - One River Morphology Study, Flood IDA / 58880 Post Request for Bids Open - National 748,297.37 Signed 2020-10-04 2020-11-12 2020-11-03 2020-11-13 2020-12-15 2020-12-17 2021-01-14 2021-02-04 2021-02-25 2021-03-17 2021-08-24 Systems for Resilience Envelope Hazard Mapping & Establishment of DSS in Sindh. PK-SID-229375-GO-RFQ / Improving Infrastructure and Request for Single Stage - One IDA / 58880 Post Open - National 283,488.74 Signed 2021-04-16 2021-04-20 2021-05-04 2021-05-06 2021-11-02 Procurement of Vehicles. Systems for Resilience Quotations Envelope NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SID-122451-NC-RFQ / Improving Infrastructure and Request for Single Stage - One IDA / 58880 Post Open - National 86,680.00 Signed 2019-07-12 2019-07-31 2019-08-02 2019-09-04 2020-01-29 Digitization of Data Systems for Resilience Quotations Envelope CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SID-2955-CS-QCBS / Procurement of Project Improving Infrastructure and Quality And Cost- IDA / 58880 Prior Open - International 4,303,336.77 Signed 2016-11-03 2016-11-03 2016-11-03 2016-12-17 2017-01-04 2017-01-14 2017-02-13 2017-02-13 2017-03-13 2017-03-20 2017-04-28 2017-04-24 2017-05-18 2018-04-24 Implementation Support and Systems for Resilience Based Selection Supervision Consultant (PISSC) PK-SID-38659-CS-CQS / Consultant Organizational Capacity Improving Infrastructure and IDA / 58880 Post Qualification Open - National 244,301.97 Signed 2017-12-04 2017-12-15 2017-12-19 2017-12-18 2018-02-20 2018-02-20 2018-03-23 2018-03-22 2018-05-04 2018-04-16 2018-10-31 Assessment of Sindh Irrigation Systems for Resilience Selection Department. PK-SID-38661-CS-CQS / Consultant Improving Infrastructure and Third Party Monitoring and IDA / 58880 Post Qualification Open - National 348,297.30 Signed 2017-12-04 2017-12-15 2017-12-19 2017-12-18 2018-02-20 2018-02-20 2018-03-23 2018-03-19 2018-05-04 2018-04-13 2021-05-03 Systems for Resilience Validation. Selection PK-SID-56147-CS-QCBS / River Morphological Study, Flood Hazard Mapping and Improving Infrastructure and Quality And Cost- IDA / 58880 Prior Open - International 1,924,831.00 Signed 2018-03-30 2018-05-31 2018-04-06 2018-06-22 2018-06-04 2018-12-04 2018-07-04 2019-10-18 2018-08-03 2020-01-26 2018-08-24 2020-05-10 2018-09-21 2020-06-01 2020-03-14 Establishment of Decision Systems for Resilience Based Selection Support System for Sindh Province PK-SID-61859-CS-QCBS / Feasibility Study of 30 Nos: of Improving Infrastructure and Quality And Cost- IDA / 58880 Prior Open - International 1,014,500.47 Signed 2018-05-08 2018-07-30 2018-05-15 2018-08-10 2018-07-12 2019-04-03 2018-08-11 2019-05-20 2018-09-10 2020-03-12 2018-10-01 2020-04-24 2018-10-29 2020-07-07 2020-04-21 Small Dams in Water Scarce Systems for Resilience Based Selection Areas in Sindh Province. PK-SID-128479-CS-CQS / Consultant Improving Infrastructure and Hydro Metrological Hazard IDA / 58880 Post Qualification Open - National 465,544.39 Signed 2019-08-22 2019-08-23 2019-09-23 2019-08-29 2019-11-08 2019-10-24 2019-12-08 2019-11-18 2020-01-13 2019-11-25 2021-01-12 Systems for Resilience Assessment of Sindh Province. Selection PK-SID-128488-CS-CQS / Consultant Performance Evaluation of Improving Infrastructure and IDA / 58880 Post Qualification Open - National 298,863.33 Signed 2019-08-22 2019-08-23 2019-09-23 2019-08-29 2019-11-08 2019-10-24 2019-12-13 2019-11-11 2020-01-20 2019-11-15 2020-07-18 Small Dams in the Sindh Systems for Resilience Selection Province. PK-SID-191831-CS-CQS / Consultant Improving Infrastructure and Risk profile for Sea Level Rise IDA / 58880 Post Qualification Open - National 291,948.18 Signed 2020-09-23 2020-11-03 2020-10-23 2020-11-05 2020-12-23 2021-03-18 2021-01-24 2021-04-26 2021-02-28 2021-05-20 2021-11-25 Systems for Resilience in Sindh Coastal Area. Selection PK-SID-191832-CS-CQS / Feasibility Study for Provision Consultant of Solar Pumps to Small Land Improving Infrastructure and IDA / 58880 Post Qualification Open - National 293,058.35 Signed 2020-09-23 2020-11-03 2020-10-23 2020-11-05 2020-12-23 2021-03-18 2021-01-22 2021-04-12 2021-02-26 2021-04-14 2021-11-23 Holder and Command Area Systems for Resilience Selection Development of Selected Area Sindh. PK-SID-197423-CS-QCBS / Project Implementation Consultant for Design Review Improving Infrastructure and Quality And Cost- Under IDA / 58880 Prior Open - International 0.00 2020-11-05 2020-12-03 2020-11-30 2020-12-07 2021-02-03 2021-02-21 2021-02-05 2021-02-22 2021-03-08 2021-06-08 2021-03-29 2021-06-24 2021-04-14 2024-10-14 and Resident Supervision of Systems for Resilience Based Selection Implementation Construction of Small Dams in Sindh. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual PK-SID-2970-CS-INDV / Improving Infrastructure and IDA / 58880 Prior Consultant Open 56,401.20 Completed 2016-11-07 2016-11-20 2016-12-27 2016-12-22 2017-01-17 2017-01-25 2017-02-21 2017-01-05 2017-08-20 2017-12-31 Finance Consultant Systems for Resilience Selection Individual PK-SID-2972-CS-INDV / M & Improving Infrastructure and IDA / 58880 Post Consultant Open 109,974.88 Signed 2016-11-07 2016-12-15 2016-12-27 2017-03-22 2017-01-17 2017-05-02 2017-02-21 2017-06-13 2017-08-20 E Consultant Systems for Resilience Selection Individual PK-SID-2973-CS-INDV / Improving Infrastructure and IDA / 58880 Post Consultant Open 117,688.81 Signed 2016-11-07 2016-12-29 2016-12-27 2017-07-03 2017-01-17 2017-07-03 2017-02-21 2017-08-07 2017-08-20 IT/GIS Consultant Systems for Resilience Selection Individual PK-SID-2975-CS-INDV / Improving Infrastructure and IDA / 58880 Post Consultant Open 94,733.35 Signed 2016-11-07 2017-12-15 2016-12-27 2018-02-09 2017-01-17 2018-02-09 2017-02-21 2018-02-08 2017-08-20 Quality Assurance Engineer Systems for Resilience Selection Page 5 Individual PK-SID-2976-CS-INDV / Improving Infrastructure and IDA / 58880 Post Consultant Open 31,029.60 Terminated 2016-11-07 2016-12-29 2016-12-27 2017-06-23 2017-01-17 2017-06-23 2017-02-21 2017-07-03 2017-08-20 Environmental Consultant Systems for Resilience Selection Individual PK-SID-2981-CS-INDV / Improving Infrastructure and Under IDA / 58880 Post Consultant Open 140,293.34 2016-11-07 2016-12-29 2016-12-27 2017-05-29 2017-01-17 2017-05-30 2017-02-21 2017-07-07 2017-08-20 Social Safeguard Consulatnt Systems for Resilience Implementation Selection PK-SID-7391-CS-INDV / Individual Procurement & Contract Improving Infrastructure and IDA / 58880 Prior Consultant Open 155,375.50 Signed 2017-02-15 2017-02-16 2017-04-05 2017-02-28 2017-04-26 2017-04-03 2017-05-31 2017-04-03 2018-05-31 Consultant (Individual Systems for Resilience Selection Consultant) PK-SID-2971-CS-INDV / Individual Improving Infrastructure and Procurement & Contract IDA / 58880 Prior Consultant Open 0.00 Canceled 2016-11-07 2016-11-17 2016-12-27 2017-01-17 2017-02-21 2017-08-20 Systems for Resilience Consultant Selection PK-SID-27831-CS-INDV / Individual Hiring of Environment Improving Infrastructure and IDA / 58880 Post Consultant Open 124,793.25 Signed 2017-09-08 2017-09-15 2017-10-02 2017-10-27 2017-10-04 2017-10-27 2017-10-06 2017-11-06 2018-10-06 Consultant (Individual Systems for Resilience Selection Consultant) Individual PK-SID-47074-CS-INDV / Improving Infrastructure and IDA / 58880 Prior Consultant Open 165,283.15 Signed 2018-02-01 2018-02-01 2018-02-02 2018-02-01 2018-02-08 2018-02-01 2018-01-01 2018-02-01 Finance Consultant Systems for Resilience Selection Individual PK-SID-92998-CS-INDV / Improving Infrastructure and IDA / 58880 Post Consultant Open 19,056.61 Signed 2019-01-01 2019-02-06 2019-01-28 2019-04-11 2019-02-04 2019-04-23 2019-02-13 2019-04-29 2020-02-12 Fiduciary Monitoring Analyst Systems for Resilience Selection PK-SID-114445-CS-INDV / Individual The Hiring of Improving Infrastructure and IDA / 58880 Post Consultant Open 64,644.92 Signed 2019-05-10 2019-05-13 2019-07-01 2019-05-14 2019-07-22 2019-05-15 2019-08-26 2019-05-16 2020-08-24 Electro/Hydraulic Individual Systems for Resilience Selection Consultant. PK-SID-121794-CS-INDV / The Hiring of Individual Consultant for carrying out Individual the Social & Environment Improving Infrastructure and IDA / 58880 Post Consultant Limited 6,403.07 Signed 2019-07-09 2019-07-09 2019-07-09 2019-07-10 2019-07-11 2019-07-10 2019-07-12 2019-08-08 2019-09-10 Impact Assessment of Systems for Resilience Selection Constructed Small Dams in Sindh Province Under Irrigation Department. PK-SID-207688-CS-INDV / Individual Improving Infrastructure and Under Social & Gender Specialist IDA / 58880 Post Consultant Limited 0.00 2020-12-04 2020-12-04 2020-12-19 2020-12-24 2020-12-30 2021-12-30 Systems for Resilience Implementation (Individual Consultant). Selection PK-SID-217159-CS-INDV / Individual Improving Infrastructure and Senior Water Management IDA / 58880 Post Consultant Limited 48,210.72 Signed 2021-02-02 2021-02-03 2021-02-16 2021-02-15 2021-02-19 2021-03-02 2021-02-25 2021-03-08 2022-02-25 Systems for Resilience Specialist. Selection Individual PK-SID-217218-CS-INDV / Improving Infrastructure and IDA / 58880 Post Consultant Limited 33,550.94 Signed 2021-02-02 2021-02-03 2021-02-16 2021-02-15 2021-02-19 2021-03-02 2021-02-25 2021-03-08 2022-02-25 Water Management Specialist. Systems for Resilience Selection Page 6 PROJET D’APPUI REGIONAL A L’INITIATIVE POUR L’IRRIGATION AU SAHEL (PARIIS) PPA2 Plan de Passation de Marchés (PPM) sur 11 mois Version du 11 octobre 2017 I. Généralités 1.1. Information générale sur le projet - Pays: Régional (Burkina Faso, Mali, Mauritanie, Niger Sénégal, Tchad) - Emprunteur (niveau régional) : CILSS - Nom du Projet : Projet d’Appui Régional à l’Initiative pour l’Irrigation au Sahel (PARIIS- SIIP) - Numéro du Projet : P154482 (PPA-CILSS N° V 160) - Montant du Don sollicité : 20 millions dollars américains - Montant des fonds rétrocédés par les pays : - Unité de Gestion du Projet : Comité permanent Inter-Etats de Lutte contre la Sécheresse dans le Sahel (CILSS) 1.2. Date d’approbation du plan de passation de marchés : Original : 25 août 2017 1.3 Date de publication de l’avis général de passation de marchés : 1er novembre 2017 1.4 Période couverte par ce Plan de Passation des Marchés : Octobre 2017 à juillet 2018 1.5 Risque global lié à la passation des marchés : Substantiel II. Fournitures, travaux et services autre que les services de consultants. 2.1 Seuils d’Examen Préalable : Décisions de Passation des Marchés sujettes à l’Examen Préalable de la Banque comme énoncé dans l’Annexe 1 des Directives : « Passation des marchés de fournitures, travaux et services assimilés » Seuil Méthode de d’utilisation de Seuil d’examen Nature du passation de la méthode de préalable de marché marchés passation en l’IDA en USD USD 1 Travaux (y ≥ Tous les contrats AOI compris clés en 5.000.000 de 10.000.000 main, Fourniture AON < 5.000.000 $EU et plus, et montage Consultation de indépendamment < 200.000 d’installations et Fournisseurs du mode de PPP) Entente Directe Pas de seuil passation ≥ Tous les contrats Fournitures, AOI 1.000.000 de 2.000.000 Systèmes AON < 1.000.000 $EU et plus, Informatiques et Consultation de indépendamment Services autres < 100.000 Fournisseurs du mode de que Services de passation Consultants Entente Directe Pas de seuil 2.2 Préqualification : Ajouter Non applicable, si pas de préqualification prévue, si non ajouter la liste de contrats pour lesquels la préqualification est prévue. 2.3 Procédures proposées pour les composantes CDD (selon le paragraphe. 3.17 des Directives : [se référer au document approprié d'exécution de projet de CDD approuvé par la Banque] 2.4 Référence au Manuel de Procédures du Projet (MPP) : Manuel du CILSS 2.5 Arrangements spéciaux de passation des marchés: Non applicable 2.6 Allotissement de travaux, fournitures et services autres que services de consultants avec méthodes et calendrier 2 1. Travaux 1 2 3 4 5 6 7 8 Ref. Description* Montant Méthode de Examen Date prévue Date prévue Commentaires No. estimé sélection Préalable ou pour pour ($.US) revue à l’ouverture l’attribution postériori par la des offres Banque Total Travaux 2. Fournitures et services autres que les services de consultants 1 2 3 4 5 6 7 8 9 N° Description du Marché Montant Méthode de Pré ou Examen Date Date Commentaires Réf estimé passation du post préalable prévue prévue ($.US) marché qualifica ou à pour pour tion posteriori l’ouverture l’attributio des offres n (au plus tard) 1. Acquisition des équipements de 17000 AON Post Posteriori Octobre Décembre bureaux, informatiques, 2017 2017 consommables 2. Traduction et édition des Documents 2700 CF Post Posteriori Octobre Décembre générés 2017 2017 Total Fournitures 19700,00 USD 3 III- Sélection de Consultants 3.1. Seuil d’examen préalable Les contrats qui seront soumis à l'examen préalable de la Banque conformément aux dispositions de l'Annexe 1 des Directives de Sélection et Emploi de Consultants de janvier 2011 : Contrats soumis à Services de Méthode de passation Valeur seuil du marché examen consultants de marchés $EU préalable de l’IDA SBQC; SBQ; SCM; SCBD, Pas de seuil Tout contrat de SBQC <300.000 1.000.000 $EU ou a) Consultant plus, s indépendamment Firmes Entente directe Pas de seuil du mode de sélection Tout contrat de Consultant individuel pas de seuil 300.000 $ EU ou plus, b) Consulta indépendamment nts du mode de Individuels Entente directe Pas de seuil sélection (comparaison de CV ou Entente directe) Tous les TDRs, quel que soit la valeur du contrat, sont soumis à examen préalable. Le justificatif de toute entente directe dont le cout estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM. 3.2. Liste restreinte composée entièrement de Consultants Nationaux : Liste restreinte de consultants pour prestations de services, d’un coût estimatif inférieur à 200 000$ US ou équivalent par contrat (ce seuil est de 400.000USD pour les Etudes architecturales et le suivi des travaux), peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants 4 Arrangements de sélection particuliers: Non applicable Services de consultants avec méthodes et dates de sélection 1 2 3 4 5 6 7 8 Re Description* Montant Méthode Examen Date Date Commentaires f. estimé de Préalable ou prévue prévue No ($.US) sélection revue à postériori pour pour . par la Banque l’ouverture l’attributio des offres n 3. conception et de 8 000 Consultant Post Octobre Décembre réalisation d’un site individuel 2017 2017 WEB PARIIS incluant des outils collaboratifs 4. Réalisation de la 40 000 Consultant Post Octobre Novembre charte et du Manuel individuel 2017 2017 d’audit 5. Recrutement expert 38 000 Consultant Post Octobre Novembre appui audit individuel 2017 2017 6. PS Appui 95 000 SBQ Post Octobre Octobre - Suivi&Evaluation 2017 2017 7. Expert Genre 5 500 Consultant Post Octobre Novembre individuel 2017 2017 8. Coordonnateur 65 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1-continuité régional directe 2017 2017 avec la préparation du projet- le CILSS enverra une lettre de confirmation de performance – 8 mois sur ce PPA2 9. Assistance en 12 500 Entente Post Octobre Octobre L’expert initialement sur le PPA1 sera Passation des directe 2017 2017 sollicité pour des prestations ponctuelles à la Marché demande. Sa disponibilité est confirmée. 10. Assistant Comptable 14 700 Consultant Post Octobre Septembre individuel 2017 2017 11. Expertise groupe de 4300 Consultant Post Octobre Décembre travail individuel 2017 2017 5 12. Assistante 19 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1-continuité administrative et Directe 2017 2017 avec la préparation du projet- le CILSS enverra une secrétariat du Projet lettre de confirmation de performance – 5 mois sur ce PPA2 13. Expert 17 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 par Communication du Directe 2017 2017 recrutement compétitif- Continuité avec la Projet préparation du projet- 4 mois sur ce PPA 2 14. Expert Suivi 21 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 par Evaluation du Projet Directe 2017 2017 recrutement compétitif- Continuité avec la préparation du projet- 5 mois sur ce PPA2 15. Assistant technique 26 800 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 par Expert GR/Irrigation Directe 2017 2017 recrutement compétitif- Continuité avec la basé au SE CILSS préparation du projet- 5 mois sur ce PPA2 Staff 16. Expert système 20 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 en charge de d’information basé à Directe 2017 2017 l‘élaboration de l ‘annexe manuel et stratégie du AGRHYMET Système d’information du Manuel de mise en Œuvre du projet - continuité avec la préparation du projet pour la finalisation de ce manuel - le CILSS enverra une lettre de confirmation de performance –3 mois sur ce PPA2 17. Expert formation 9 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 en charge de basé à AGRHYMET Directe 2017 2017 l‘élaboration de l ‘annexe manuel et stratégie de formation du Manuel de mise en Œuvre du projet - continuité avec la préparation du projet pour la finalisation de ce manuel - le CILSS enverra une lettre de confirmation de performance –1 mois et demi mois sur ce PPA2 18. Expert en gestion de 17 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 en charge de connaissance basé à Directe 2017 2017 l‘élaboration de l ‘annexe manuel et stratégie de l’INSAH gestion de connaissance du Manuel de mise en Œuvre du projet - continuité avec la préparation du projet pour la finalisation de ce manuel - le CILSS enverra une lettre de confirmation de performance –3 mois sur ce PPA2 19. Expert en Recherche 11 300 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 en charge de Appliquée basé Directe 2017 2017 l‘élaboration de l ‘annexe manuel et stratégie de recherche appliquée du Manuel de mise en Œuvre du projet - continuité avec la préparation du projet pour la finalisation de ce manuel - le 6 CILSS enverra une lettre de confirmation de performance –2 mois sur ce PPA2 20. Stagiaire Irrigation 400 Consultant Post Octobre Octobre individuel 2017 2017 21. Stagiaire 400 Consultant Post Octobre Octobre Communication individuel 2017 2017 Total Consultants 424900 ,00 USD 7 PROCUREMENT Western Africa : Sahel Irrigation Initiative Support Project PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-11-26 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154482 GPN Date: Project Name: Sahel Irrigation Initiative Support Project Loan / Credit No: IDA / 61590, IDA / D2560 SN Sahel Irrigation Initiative Support Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SN-PARIISSN-115351-CW- Component C: Knowledge Request for Single Stage - One 2019-04- RFQ / câblage réseau IDA / 61590 management and Post Limited 39,316.00 37,482.75 Signed 2019-02-17 2019-02-07 2019-03-29 2019-07-22 Quotations Envelope 30 informatique téléphones coordination SN-PARIISSN-115379-CW- Component B: Financing RFB / Réhabilitation de 100Ha Single Stage - One 2020-06- IDA / 61590 irrigation investment Post Request for Bids Open - National 92,304.00 0.00 Canceled 2019-08-29 2019-09-03 2019-10-15 2019-11-14 2019-12-19 de Petits Périmètres Envelope 16 solutions Maraîchers Féminins SN-PARIISSN-115380-CW- Component B: Financing Request for Single Stage - One 2020-05- RFQ / Construction de IDA / 61590 irrigation investment Post Limited 76,920.00 0.00 Canceled 2019-10-02 2019-11-27 Quotations Envelope 25 magasins solutions SN-PARIISSN-115383-CW- RFB / Travaux de réalisation de réseaux d'irrigation, Component B: Financing Single Stage - One 2020-12- clôture et bâtiments pour 10 IDA / 61590 irrigation investment Post Request for Bids Open - National 632,480.00 0.00 Canceled 2020-02-27 2020-03-03 2020-04-14 2020-05-14 2020-06-18 Envelope 15 fermes villageoises 2 petits solutions périmètres maraichers féminins SN-PARIISSN-115386-CW- RFB / Travaux de Component B: Financing Revitalisation de PIV Single Stage - One 1,474,664.4 2020-07- IDA / 61590 irrigation investment Post Request for Bids Open - National 1,641,024.00 Signed 2019-09-27 2019-11-18 2019-10-02 2019-11-13 2019-12-31 2019-12-13 2020-01-14 2020-01-17 2020-06-22 (périmètres irrigués villageois) Envelope 1 15 solutions à Matam, Bakel, Podor - 1200 ha Component C: Knowledge SN-PARIISSN-115412-CW- Request for Single Stage - One 2019-01- IDA / 61590 management and Post Limited 8,547.00 7,881.17 Signed 2019-01-15 2018-12-23 2019-01-21 2019-03-15 RFQ / réfection locaux UGP Quotations Envelope 30 coordination SN-PARIISSN-137959-CW- Component B: Financing RFQ / Travaux Request for Single Stage - One 2020-02- IDA / 61590 irrigation investment Post Open - National 200,000.00 543,394.55 Completed 2019-10-20 2020-01-05 2019-12-15 2020-03-25 d'aménagement de petits Quotations Envelope 13 solutions périmères féminins dans le bassin arachidier SN-PARIISSN-161075-CW- Component B: Financing Pending RFB / Travaux Single Stage - One 2021-10- IDA / 61590 irrigation investment Post Request for Bids Open - National 205,128.00 0.00 Implementat 2021-01-05 2021-01-10 2021-02-21 2021-03-23 2021-04-27 d'aménagement de 50 ha de Envelope 24 solutions ion plateau_SODAGRI SN-PARIISSN-161076-CW- Component B: Financing Under Single Stage - One 2021-10- RFB / Travaux d'aménagement IDA / 61590 irrigation investment Post Request for Bids Open - National 512,821.00 456,656.78 Implementat 2021-01-12 2020-09-16 2021-01-17 2021-02-28 2020-10-13 2021-03-30 2021-01-07 2021-05-04 Envelope 31 de 30 PPM solutions ion SN-PARIISSN-161077-CW- Component B: Financing Under Single Stage - One 2021-04- RFB / Travaux de construction IDA / 61590 irrigation investment Post Request for Bids Open - National 153,846.00 167,297.21 Implementat 2020-07-15 2020-08-28 2020-07-20 2020-08-31 2020-10-01 2020-09-30 2021-01-07 2020-11-04 Envelope 03 de 6 magasins de stockage solutions ion SN-PARIISSN-168415-CW- RFQ / Réalisation d'un Component C: Knowledge magasin pour le stockage des Request for Single Stage - One 2021-02- IDA / 61590 management and Post Limited 6,838.00 7,064.28 Signed 2020-06-15 2020-09-22 2020-08-10 2020-10-08 fournitures du PARIIS et Quotations Envelope 06 coordination l'archivage des dossiers de marchés SN-PARIISSN-160218-CW- Component B: Financing RFB / Travaux de réalisation Single Stage - One 2021-06- IDA / 61590 irrigation investment Post Request for Bids Open - National 1,487,179.00 0.00 Canceled 2020-09-08 2020-09-13 2020-10-25 2020-11-24 2020-12-29 de forage et équipement de Envelope 27 solutions pompage pour 12 fermes SN-PARIISSN-161026-CW- RFB / Travaux de mise en Component C: Knowledge Single Stage - One 2020-12- place de mini piézomètres IDA / 61590 management and Post Request for Bids Limited 95,726.00 0.00 Canceled 2020-04-14 2020-04-19 2020-05-31 2020-06-30 2020-08-04 Envelope 02 pour le suivi de la nappe coordination phréatique SN-PARIISSN-161074-CW- RFB / Travaux de Component B: Financing réhabilitation du barrage de Single Stage - One 2021-11- IDA / 61590 irrigation investment Post Request for Bids Open - National 854,701.00 0.00 Canceled 2020-11-02 2021-01-28 2021-03-11 2021-04-10 2021-05-15 Diop Kounda (digue et Envelope 11 solutions ouvrage de franchissement)_SODAGRI SN-PARIISSN-160645-CW- RFB / Travaux de réalisation Component B: Financing de deux (02) magasins de Single Stage - One 2021-03- IDA / 61590 irrigation investment Post Request for Bids Limited 94,017.00 0.00 Canceled 2020-07-19 2020-07-24 2020-09-04 2020-10-04 2020-11-08 stockage et de linéaires de Envelope 08 solutions Pistes de désenclavement et desserte de la production SN-PARIISSN-160394-CW- Component B: Financing RFB / Travaux de réalisation Single Stage - One 2021-05- IDA / 61590 irrigation investment Post Request for Bids Open - National 632,479.00 0.00 Canceled 2020-07-14 2020-07-19 2020-08-30 2020-09-29 2020-11-03 de réseau d'irrigation, clôture Envelope 02 solutions et bâtiment pour 12 fermes SN-PARIISSN-231292-CW- RFB / Travaux de mise en Component C: Knowledge Request for Pending Request for Single Stage - One 2022-01- place de mini piézomètres IDA / 61590 management and Post Limited Quotations (Non 85,470.00 0.00 Implementat 2021-05-24 2021-07-19 Quotations Envelope 15 pour le suivi de la nappe coordination Bank-SPD) ion phréatique Page 1 SN-PARIISSN-237211-CW- RFB / Travaux de réalisation de forages et installation Request for Bids - Component B: Financing Pending d’équipements de pompage Single Stage - One Small Works SPD 2022-04- IDA / 61590 irrigation investment Post Request for Bids Open - National 1,711,365.00 0.00 Implementat 2021-06-22 2021-06-27 2021-08-08 2021-09-07 2021-10-12 solaire pour 12 fermes Envelope (1 envelope 10 solutions ion villageoises de productions process) végétales dans les régions de Thiès, Diourbel et Kaolack SN-PARIISSN-237212-CW- RFB / Travaux de réalisation de clôture, de réseaux Request for Bids - Component B: Financing Pending d’irrigation et bâtiments pour Single Stage - One Small Works SPD 2022-04- IDA / 61590 irrigation investment Post Request for Bids Open - National 965,559.00 0.00 Implementat 2021-06-22 2021-06-27 2021-08-08 2021-09-07 2021-10-12 12 fermes villageoises de Envelope (1 envelope 10 solutions ion productions végétales dans process) les régions de Thiès, Diourbel et Kaolack GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual F-01-PARIIS-SN-18 / Component A: Modernizing Request for Single Stage - One Acquisition de véhicules et de IDA / 61590 Post Limited 393,000.00 388.47 Signed 2018-10-22 2018-10-22 2018-12-17 2018-11-23 2019-06-15 the institutional framework Quotations Envelope motos F-02-PARIIS-18 / Component C: Knowledge Request for Single Stage - One Equipement et mobilier de IDA / 61590 management and Post Limited 34,188.00 32,142.57 Signed 2018-10-20 2018-10-24 2018-12-15 2018-11-13 2019-06-13 Quotations Envelope bureau coordination F-03-PARIIS-18 / Component C: Knowledge Request for Single Stage - One acquisitions matériels IDA / 61590 management and Post Limited 69,059.00 48,828.21 Signed 2018-10-22 2018-11-19 2018-12-17 2018-12-10 2019-06-15 Quotations Envelope informatiques coordination F-05-PARIIS-18 / acquisition Component C: Knowledge Request for Single Stage - One de matériel de communication IDA / 61590 management and Post Limited 11,966.00 7,939.66 Signed 2018-10-20 2018-10-24 2018-12-15 2018-11-14 2019-06-13 Quotations Envelope (téléphone pour le personnel) coordination F-06-PARIIS-18 / acquisition Component C: Knowledge Request for Single Stage - One de logiciel de gestion TOM2 IDA / 61590 management and Post Limited 20,000.00 28,449.55 Signed 2018-10-24 2018-12-11 2018-12-19 2019-01-04 2019-06-17 Quotations Envelope PRO coordination Component C: Knowledge F-7-PARIIS-19 / acquisition Request for Single Stage - One IDA / 61590 management and Post Limited 30,800.00 12,364.24 Signed 2019-02-09 2019-02-06 2019-04-06 2019-03-01 2019-10-03 fourniture bureau Quotations Envelope coordination F-09-PARIIS-19 / acquisition Component C: Knowledge Request for Single Stage - One de consommables IDA / 61590 management and Post Limited 23,000.00 6,371.80 Signed 2019-02-06 2019-03-20 2019-03-15 2019-04-16 2019-04-16 Quotations Envelope informatiques coordination SN-PARIISSN-115307-GO- Component C: Knowledge RFQ / Acquisition carburant Request for Single Stage - One IDA / 61590 management and Post Limited 8,632.00 0.00 Canceled 2019-08-04 2019-09-29 2020-09-28 pour AGEX DBRLA/DGPRE cf. Quotations Envelope coordination Convention SN-PARIISSN-115310-GO- Component C: Knowledge Under RFQ / Acquisition matériel Request for Single Stage - One IDA / 61590 management and Post Limited 1,709.00 0.00 Implementati 2019-07-11 2019-07-26 2019-09-05 2019-10-05 informatique pour AGEX ( Quotations Envelope coordination on DBRLA, DGPRE) cf. convention SN-PARIISSN-115363-GO- Component C: Knowledge Single Stage - One RFB / acquisition groupe IDA / 61590 management and Post Request for Bids Limited 16,446.00 16,187.67 Signed 2019-02-20 2019-02-18 2019-02-26 2019-02-26 2019-02-28 2019-02-28 2019-02-28 2019-02-28 2019-03-05 2019-03-05 2019-03-10 Envelope électrogène coordination SN-PARIISSN-115372-GO- Component C: Knowledge Request for Single Stage - One RFQ / Acquisition du logiciel IDA / 61590 management and Post Limited 17,000.00 15,854.15 Signed 2019-06-08 2019-11-24 2019-08-03 2019-12-17 2019-08-10 Quotations Envelope Excel avancé et MES-PROJECT coordination SN-PARIISSN-115409-GO- Component C: Knowledge RFQ / Acquisition de logiciel Request for Single Stage - One IDA / 61590 management and Post Limited 8,547.00 0.00 Canceled 2020-03-02 2020-04-27 2020-07-26 et formation sur le traitement Quotations Envelope coordination des images et du son SN-PARIISSN-115414-GO- Component C: Knowledge Request for Single Stage - One RFQ / acquisition de produits IDA / 61590 management and Post Limited 5,128.00 4,664.27 Signed 2019-02-19 2019-04-16 2019-03-14 2019-05-08 2019-03-18 Quotations Envelope d'entretien coordination SN-PARIISSN-115415-GO- Component C: Knowledge Request for Single Stage - One RFQ / Acquisition des IDA / 61590 management and Post Limited 36,307.00 35,272.53 Signed 2018-10-23 2019-03-15 2018-12-18 2019-04-03 2019-06-16 Quotations Envelope fournitures carburant coordination SN-PARIISSN-125022-GO- Component C: Knowledge RFQ / aquisition d'un logiciel Request for Single Stage - One IDA / 61590 management and Post Limited 17,094.00 16,543.41 Signed 2019-11-05 2019-08-25 2019-12-31 2019-12-27 2020-01-30 pour le suivi des interventions Quotations Envelope coordination de PARIIS_SN SN-PARIISSN-125023-GO- Component C: Knowledge RFQ / Acquisition de kit Request for Single Stage - One IDA / 61590 management and Post Limited 10,256.00 8,977.30 Signed 2020-01-04 2019-11-21 2020-02-29 2020-01-06 2020-05-29 multiparamètres pour les Quotations Envelope coordination acteurs locaux SN-PARIISSN-130290-GO- Component C: Knowledge Request for Single Stage - One RFQ / acquisition de pneux IDA / 61590 management and Post Limited 5,342.00 5,324.99 Signed 2019-10-16 2019-11-18 2019-12-11 2019-11-21 2020-03-10 Quotations Envelope pour les véhicules de l'UGP coordination SN-PARIISSN-130471-GO- Component C: Knowledge Request for Single Stage - One RFQ / Acquisition de registres IDA / 61590 management and Post Limited 5,128.00 4,097.68 Signed 2019-10-04 2019-10-11 2019-11-29 2019-12-17 2020-01-28 Quotations Envelope de plaintes coordination SN-PARIISSN-130512-GO- RFQ / Acquisition Component C: Knowledge Request for Single Stage - One d'équipement de protection IDA / 61590 management and Post Limited 6,838.00 2,728.49 Signed 2019-11-02 2020-03-03 2019-12-28 2020-08-17 2020-03-27 Quotations Envelope individuelle pour les agents coordination du PARIIS Page 2 SN-PARIISSN-160811-GO- Component C: Knowledge Under RFQ / Acquisition de matériels Request for Single Stage - One IDA / 61590 management and Post Limited 15,385.00 16,557.77 Implementati 2020-04-04 2020-12-02 2020-05-30 2020-09-27 hydrométriques et installation Quotations Envelope coordination on de station hydrométrique SN-PARIISSN-161022-GO- Component C: Knowledge RFQ / Acquisition des Request for Single Stage - One IDA / 61590 management and Post Limited 42,735.00 45,157.57 Signed 2020-04-20 2020-12-02 2020-06-15 2021-01-11 2020-08-14 équipements pour le mapping Quotations Envelope coordination des ressources en eau SN-PARIISSN-161250-GO- Component C: Knowledge RFQ / Acquisition Request for Single Stage - One IDA / 61590 management and Post Limited 34,188.00 23,867.56 Signed 2020-03-23 2020-06-09 2020-05-18 2020-07-14 2021-05-18 d'équipements informatiques Quotations Envelope coordination et de communication SN-PARIISSN-161257-GO- Component C: Knowledge RFQ / Acquisition de Request for Single Stage - One IDA / 61590 management and Post Limited 8,547.00 5,892.88 Signed 2020-03-31 2020-06-10 2020-05-26 2020-07-29 2021-05-26 fournitures de bureaux et Quotations Envelope coordination consommables informatiques SN-PARIISSN-161271-GO- Component C: Knowledge Request for Single Stage - One RFQ / Acquisition de produits IDA / 61590 management and Post Limited 5,128.00 5,983.18 Signed 2020-03-22 2020-06-26 2020-05-17 2020-07-20 2020-06-16 Quotations Envelope d'entretien coordination SN-PARIISSN-168417-GO- Component C: Knowledge Request for Single Stage - One RFQ / acquisition de pneus IDA / 61590 management and Post Limited 3,419.00 2,855.64 Signed 2020-05-17 2020-06-18 2020-07-12 2020-06-29 2020-11-09 Quotations Envelope pour les véhicules des AGEX coordination SN-PARIISSN-197618-GO- Component C: Knowledge RFQ / Acquisition de matériels Request for Single Stage - One IDA / 61590 management and Post Limited 26,641.00 27,726.18 Signed 2020-11-17 2020-12-17 2021-01-12 2020-12-23 2021-03-13 informatiques et de Quotations Envelope coordination consommables informatique SN-PARIISSN-205756-GO- Component C: Knowledge RFQ / Acquisition de supports Request for Single Stage - One IDA / 61590 management and Post Limited 34,188.00 36,143.51 Signed 2020-11-28 2020-12-14 2021-01-23 2020-12-22 2021-01-26 de communication sur les Quotations Envelope coordination solutions d'irrigation SN-PARIISSN-138556-GO- RFQ / acquisition d'intrants Component B: Financing pour la valorisation de petits Request for Single Stage - One IDA / 61590 irrigation investment Post Limited 85,000.00 0.00 Canceled 2020-02-04 2020-03-31 2020-06-29 périmètres féminins dans les Quotations Envelope solutions sites d'ancrage (Bassin arachidier) SN-PARIISSN-138088-GO- RFQ / acquisition de Goodies Component C: Knowledge Request for Single Stage - One pour le PARIIS_SN (agendas, IDA / 61590 management and Post Limited 9,000.00 0.00 Canceled 2019-12-16 2020-02-10 2020-05-10 Quotations Envelope portes clés, carte de visite coordination etc.. SN-PARIISSN-231289-GO- RFQ / Acquisition de matériels Component C: Knowledge et consommables Request for Single Stage - One IDA / 61590 management and Post Limited 13,162.00 14,108.07 Signed 2021-05-08 2021-05-04 2021-07-03 2021-05-20 2021-08-17 informatiques pour l'UGP et Quotations Envelope coordination les plateformes multi-acteurs (PMA) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-01-PARIIS-18 / Component C: Knowledge Request for Single Stage - One Recrutement d'un prestataire IDA / 61590 management and Post Limited 7,385.00 7,868.55 Signed 2018-10-28 2019-05-02 2018-12-23 2019-05-20 2019-06-21 Quotations Envelope pour nettoiement coordination S-02-PARIIS-18 / Component C: Knowledge Request for Single Stage - One Recrutement d'une agence de IDA / 61590 management and Post Limited 13,346.00 21,567.42 Signed 2018-10-28 2019-01-09 2018-12-23 2019-02-01 2019-06-21 Quotations Envelope gardiennage coordination S-03-PARIIS-19 / Conception Component C: Knowledge Request for Single Stage - One et impression dépliants T- IDA / 61590 management and Post Limited 10,000.00 15,266.60 Completed 2019-02-17 2019-03-28 2019-04-09 2019-04-11 2019-05-06 2019-08-28 Quotations Envelope shirts-képis et kakémonos coordination S-03-PARIIS-18 / Component C: Knowledge Request for Single Stage - One Recrutement d'une agence de IDA / 61590 management and Post Limited 13,846.00 0.00 Canceled 2018-12-01 2019-01-09 2019-01-26 2019-07-25 Quotations Envelope gardiennage coordination SN-PARIISSN-115316-NC- Component C: Knowledge DIR / entretien réparation IDA / 61590 management and Post Direct Selection Direct 27,620.00 11,877.32 Completed 2019-06-26 2019-01-29 2019-07-01 2019-02-21 2019-08-05 2019-03-17 2020-08-04 2021-05-21 véhicule coordination SN-PARIISSN-115416-NC- Component C: Knowledge Request for Single Stage - One RFQ / Prise en charge médical IDA / 61590 management and Post Limited 55,000.00 35,987.87 Signed 2019-02-19 2019-01-16 2019-03-18 2019-03-07 2020-01-06 Quotations Envelope pour personnel coordination SN-PARIISSN-124983-NC- RFQ / Edition d'un outil de Component B: Financing gestion, d'entretien et de Request for Single Stage - One IDA / 61590 irrigation investment Post Limited 8,547.00 0.00 Canceled 2019-10-28 2019-12-23 2020-03-22 maintenance des Quotations Envelope solutions aménagements dans le bassin arachidier SN-PARIISSN-130509-NC- RFQ / entretien et Component A: Modernizing Request for Single Stage - One IDA / 61590 Post Limited 6,838.00 5,465.05 Signed 2019-10-31 2020-04-28 2019-12-26 2020-05-26 2020-03-25 maintenance matériel the institutional framework Quotations Envelope informatique SN-PARIISSN-130513-NC- Component C: Knowledge Pending Request for Single Stage - One RFQ / Production de supports IDA / 61590 management and Post Limited 10,256.00 0.00 Implementati 2020-01-04 2020-02-29 2020-05-29 Quotations Envelope de communication coordination on SN-PARIISSN-161225-NC- RFQ / Référence C2.3.4.2 Component C: Knowledge Request for Single Stage - One Recrutement d'un prestataire IDA / 61590 management and Post Limited 7,350.00 3,245.21 Signed 2020-04-19 2020-09-21 2020-06-14 2020-10-08 2021-06-14 Quotations Envelope pour assurer la maintenance coordination des logiciels Page 3 SN-PARIISSN-161267-NC- Component C: Knowledge RFQ / Recrutement d'un Request for Single Stage - One IDA / 61590 management and Post Limited 6,838.00 5,456.50 Signed 2020-03-29 2020-04-28 2020-05-24 2020-05-26 2021-05-24 prestataire pour assurer la Quotations Envelope coordination maintenance Informatique SN-PARIISSN-161543-NC- RFQ / Recrutement d'un Component C: Knowledge Request for Single Stage - One prestataire pour la mise en IDA / 61590 management and Post Limited 17,094.00 7,481.08 Signed 2020-03-21 2020-07-17 2020-05-16 2020-10-08 2020-09-13 Quotations Envelope place d'un site WEB pour coordination PARIIS_SN SN-PARIISSN-168419-NC- RFQ / Recrutement d'un Component C: Knowledge prestataire pour assurer la Request for Single Stage - One IDA / 61590 management and Post Limited 1,709.00 2,543.28 Signed 2020-06-06 2020-10-27 2020-08-01 2020-11-30 2021-08-02 maintenance du réseau du Quotations Envelope coordination PARIIS ( internet, serveur, vidéoconférence) SN-PARIISSN-168416-NC- Component C: Knowledge RFQ / Recrutement d'un Request for Single Stage - One IDA / 61590 management and Post Limited 7,692.00 8,317.98 Signed 2020-06-14 2020-10-01 2020-08-09 2020-10-19 2021-02-05 prestataire pour la réparation Quotations Envelope coordination des véhicules du PARIIS. SN-PARIISSN-161580-NC- Component B: Financing Request for Single Stage - One RFQ / Recrutement d'un IDA / 61590 irrigation investment Post Limited 25,641.00 0.00 Canceled 2020-03-15 2020-05-10 2020-09-07 Quotations Envelope prestataire (Billet d'avion) solutions CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C-03-PARIIS-18 / Etudes de Component B: Financing Raccordement périmètres a Quality And Cost- IDA / 61590 irrigation investment Post Open - National 282,051.00 429,466.92 Signed 2018-11-30 2019-01-18 2018-12-21 2019-02-03 2019-02-13 2019-03-03 2019-05-31 2019-04-02 2019-06-13 2019-05-07 2019-08-14 2019-06-11 2019-11-27 2020-06-10 l'Emissaire de drainage Based Selection solutions branche B C-04-2018 / Etudes Component B: Financing APS/APD/DCE de la branche A Quality And Cost- Under IDA / 61590 irrigation investment Post Open - International 1,538,461.00 0.00 2019-01-21 2019-04-27 2019-02-19 2019-06-03 2019-03-29 2019-12-03 2019-05-13 2020-01-28 2019-06-27 2020-07-10 2019-08-01 2020-10-05 2019-09-05 2020-09-04 de l'Emissaire Delta et du Based Selection Implementation solutions Diawel C-05-PARIIS-19 / Identification sites, études, Component B: Financing contrôle des travaux Quality And Cost- IDA / 61590 irrigation investment Post Open - National 102,564.00 0.00 Canceled 2019-01-29 2019-01-07 2019-02-28 2019-04-13 2019-06-26 2019-07-26 2019-08-30 2019-10-04 2020-10-03 d'aménagements de 50 ha de Based Selection solutions plateaux pour la valorisation des eaux pluviales C-06-PARIIS-19 / Elaboration Plans de Gestion Component B: Financing des Ressources en eau dans Quality And Cost- IDA / 61590 irrigation investment Post Open - National 239,000.00 150,052.64 Signed 2019-01-14 2019-01-16 2019-02-24 2019-03-28 2019-07-24 2019-05-14 2019-08-19 2019-06-11 2019-08-22 2019-07-01 2019-09-17 2019-08-05 2019-11-20 2020-08-04 les SUGP Gambie et Thiangol Based Selection solutions Dangol Dia, et Delta du Saloum SN-PARIISSN-115313-CS- QCBS / Recrutement d'un Component B: Financing cabinet pour les étude Quality And Cost- IDA / 61590 irrigation investment Post Open - National 150,000.00 0.00 Canceled 2019-08-28 2019-09-18 2019-11-01 2019-11-29 2019-12-29 2020-02-02 2020-03-08 2020-06-06 d'identification de projets Based Selection solutions potentiels bancables en Casamance SN-PARIISSN-115319-CS- QCBS / Recrutement d'un Component A: Modernizing Quality And Cost- IDA / 61590 Post Open - National 369,000.00 0.00 Canceled 2019-07-24 2019-08-14 2019-09-27 2019-10-25 2019-11-24 2019-12-29 2020-02-02 2020-05-12 cabinet pour l'élaboration de the institutional framework Based Selection POAS SN-PARIISSN-115149-CS- CQS / Recrutement Component C: Knowledge Consultant Consultant individuel pour IDA / 61590 management and Post Qualification Open - National 8,547.00 0.00 Under Review 2019-08-22 2020-01-06 2019-09-12 2019-10-26 2019-11-25 2019-12-30 2020-03-29 l'élaboration du Plan de coordination Selection formation de l'UGP et des partenaires SN-PARIISSN-115150-CS- CQS / Recrutement d'un consultant pour les études de Component C: Knowledge Consultant capitalisation et de IDA / 61590 management and Post Qualification Open - National 4,273.00 80,383.04 Signed 2019-12-23 2019-07-17 2020-01-13 2020-02-26 2019-09-09 2020-03-27 2019-10-04 2020-05-01 2019-10-23 2020-07-30 documentation des bonnes coordination Selection pratiques des solutions d'irrigation SN-PARIISSN-115249-CS- CQS / Recrutement d'un Component C: Knowledge Consultant consultant pour la revue du IDA / 61590 management and Post Qualification Open - National 10,256.00 0.00 Under Review 2019-08-16 2019-12-16 2019-09-06 2019-10-20 2019-11-19 2019-12-24 2020-02-22 manuel administratif et coordination Selection financier SN-PARIISSN-115250-CS- CQS / Recrutement d'un Component C: Knowledge Consultant consultant pour la révision du IDA / 61590 management and Post Qualification Open - National 6,838.00 0.00 Canceled 2019-08-30 2019-09-20 2019-11-03 2019-12-03 2020-01-07 2020-04-06 manuel de mise en œuvre coordination Selection technique de PARIIS-SN SN-PARIISSN-115255-CS- Consultant CQS / Recrutement d'un Component A: Modernizing IDA / 61590 Post Qualification Open - National 30,769.00 0.00 Canceled 2019-11-30 2019-07-09 2019-12-21 2020-02-03 2020-03-04 2020-04-08 2020-07-07 consultant pour l'Evaluation the institutional framework Selection sociale des sites de travaux SN-PARIISSN-115377-CS- Component B: Financing Consultant CQS / Recrutement d'un IDA / 61590 irrigation investment Post Qualification Open - National 17,100.00 0.00 Canceled 2019-08-27 2019-09-17 2019-10-31 2019-11-30 2020-01-04 2020-04-03 consultant pour l'inventaire solutions Selection des sites prioritaires SN-PARIISSN-115378-CS- Component B: Financing Consultant CQS / Etude d'Impact IDA / 61590 irrigation investment Post Qualification Open - National 34,188.00 0.00 Canceled 2019-08-29 2019-09-19 2019-11-02 2019-12-02 2020-01-06 2020-04-05 Environnementales du Barrage solutions Selection de Diopkunda Page 4 SN-PARIISSN-115381-CS- CQS / Recrutement d'un Component B: Financing Consultant consultant (firme) chargé du Pending IDA / 61590 irrigation investment Post Qualification Open - National 119,658.00 0.00 2019-07-31 2019-08-21 2019-10-04 2019-11-03 2019-12-08 2020-06-05 contrôle et du suivi des Implementation solutions Selection travaux des 10 fermes et 2 PPM SN-PARIISSN-115384-CS- CQS / Réalisation d'études et Component B: Financing Consultant validation par un consultant IDA / 61590 irrigation investment Post Qualification Open - National 76,923.00 116,946.77 Signed 2019-07-24 2019-09-17 2019-08-14 2019-09-27 2019-11-04 2019-10-27 2019-12-04 2019-12-01 2019-12-26 2020-02-29 chargé de la validation des solutions Selection sites, des études d'APS, APD et élaboration DCE SN-PARIISSN-115387-CS- CQS / Etudes d'impact Component B: Financing Consultant environnemental et social IDA / 61590 irrigation investment Post Qualification Open - National 91,450.00 0.00 Canceled 2019-08-28 2019-09-18 2019-11-01 2019-12-01 2020-01-05 2020-04-04 (EIES) de l'Emissaire de solutions Selection drainage Branches A et B SN-PARIISSN-115389-CS- QCBS / Etudes pour la constitution d'un portefeuille Component B: Financing de projets bancables Quality And Cost- IDA / 61590 irrigation investment Post Open - National 170,940.00 0.00 Canceled 2019-12-30 2020-01-20 2020-03-04 2020-04-01 2020-05-01 2020-06-05 2020-07-10 2020-11-07 d'aménagement de bas-fonds Based Selection solutions de type 1 et de PPM de type 3 ( régions de Thiès, Fatick, Kaolack et Karine) ZIP C SN-PARIISSN-115391-CS- CQS / Etudes APS APD DAO pour la réhabilitation de 500 ha d'aménagements existants de bas-fonds de type 1 la Component B: Financing Consultant revitalisation de 200 ha de PIV IDA / 61590 irrigation investment Post Qualification Open - National 40,680.00 0.00 Canceled 2020-02-27 2020-03-19 2020-05-02 2020-06-01 2020-07-06 2021-01-02 de type 3, l'aménagement de solutions Selection 200 ha de nouveaux bas- fonds de typ1 et de 100 ha de PPM féminins de type 3 dans le Bass SN-PARIISSN-115395-CS- QCBS / Contrôle des travaux Component B: Financing Quality And Cost- de revitalisation de 1200 ha IDA / 61590 irrigation investment Post Open - National 164,102.00 246,787.99 Signed 2019-09-26 2019-07-09 2019-10-17 2019-11-30 2019-11-11 2019-12-28 2020-02-11 2020-01-27 2020-04-13 2020-03-02 2020-03-31 2020-04-06 2020-06-30 2020-10-03 Based Selection de PIV dans la vallée du Fleuve solutions Sénégal SN-PARIISSN-115404-CS- Component B: Financing QCBS / Recrutement d'un Quality And Cost- IDA / 61590 irrigation investment Post Open - National 200,000.00 0.00 Canceled 2020-01-23 2020-02-13 2020-03-28 2020-04-25 2020-05-25 2020-06-29 2020-08-03 2020-12-01 consultant pour les études Based Selection solutions APS/APD/DAO SN-PARIISSN-115406-CS- QCBS / Recrutement d'un Component B: Financing consultant pour les études Quality And Cost- IDA / 61590 irrigation investment Post Open - National 50,000.00 0.00 Canceled 2020-02-28 2020-03-20 2020-05-03 2020-05-31 2020-06-30 2020-08-04 2020-09-08 2020-12-07 d'évaluation environnementale Based Selection solutions de projets bancables en Casamance. SN-PARIISSN-125024-CS- Consultant CQS / Recrutement d'un Component A: Modernizing IDA / 61590 Post Qualification Open - National 58,120.00 0.00 Under Review 2020-01-30 2020-09-14 2020-02-20 2020-04-04 2020-05-04 2020-06-08 2020-12-05 consultant pour la formation the institutional framework Selection en GIRE des acteurs locaux SN-PARIISSN-130477-CS- Component C: Knowledge Consultant CQS / Etude de plans de plans IDA / 61590 management and Post Qualification Open - National 119,558.00 135,389.81 Signed 2019-11-30 2019-11-11 2019-12-21 2020-02-03 2020-02-06 2020-03-04 2020-06-23 2020-04-08 2020-06-23 2020-10-05 de réinstallation de PIV et de coordination Selection fermes SN-PARIISSN-138002-CS- CQS / Recrutement d'un Component B: Financing Consultant cabinet pour l'aménagement IDA / 61590 irrigation investment Post Qualification Open - National 69,000.00 0.00 Canceled 2020-02-26 2020-03-18 2020-05-01 2020-05-31 2020-07-05 2020-10-03 de petits périmètres féminins solutions Selection dans la ZIP C (Zone Sud) SN-PARIISSN-139356-CS- CQS / Recrutement d'un Component B: Financing Consultant cabinet pour le contrôle de IDA / 61590 irrigation investment Post Qualification Open - National 34,188.00 60,972.64 Signed 2019-12-26 2019-10-22 2020-01-16 2020-02-29 2020-03-24 2020-03-30 2020-06-07 2020-05-04 2020-06-15 2020-10-31 l'aménagement de petits solutions Selection périmètres féminins dans le bassin arachidier SN-PARIISSN-142911-CS- CQS / Recrutement d’un cabinet chargé d’élaborer un Component B: Financing Consultant Plan d’action de réinstallation IDA / 61590 irrigation investment Post Qualification Open - National 128,205.00 115,827.02 Signed 2019-12-17 2019-11-11 2020-01-07 2020-02-20 2020-05-12 2020-03-21 2020-05-12 2020-04-25 2020-08-31 2020-09-12 (PAR) relatif aux travaux dans solutions Selection la zone de DBRLA du PARIIS SN (ZIP C) SN-PARIISSN-160399-CS- CQS / Sélection d'un Component B: Financing Consultant consultant pour le contrôle et IDA / 61590 irrigation investment Post Qualification Open - National 119,658.00 0.00 Under Review 2020-05-14 2021-06-16 2020-06-04 2020-07-18 2020-08-17 2020-09-21 2021-03-20 le suivi des travaux des 12 solutions Selection fermes SN-PARIISSN-160560-CS- CQS / Recrutement d'un consultant pour conduire les études APS/APD/DAO pour la Component B: Financing Consultant revitalisation de 200 ha de PIV IDA / 61590 irrigation investment Post Qualification Open - National 34,188.00 0.00 Canceled 2020-04-13 2020-05-04 2020-06-17 2020-07-17 2020-08-21 2020-09-05 et la réalisation de 70 ha de solutions Selection Petits Périmètres Maraîchers de type 3 dans le bassin arachidier_DBRLA SN-PARIISSN-161031-CS- QCBS / Sélection d'un Component B: Financing consultant pour conduire les Quality And Cost- IDA / 61590 irrigation investment Post Open - National 59,829.00 0.00 Canceled 2020-04-14 2020-05-05 2020-06-18 2020-07-16 2020-08-15 2020-09-19 2020-10-24 2021-08-20 études D'Impact Based Selection solutions Environnementales Branche B_SAED Page 5 SN-PARIISSN-161033-CS- QCBS / Sélection d'un Component B: Financing Quality And Cost- Under consultant pour conduire les IDA / 61590 irrigation investment Post Open - National 341,880.00 0.00 2020-03-10 2021-01-15 2020-03-31 2020-05-14 2020-06-11 2020-07-11 2020-08-15 2020-09-19 2021-05-17 Based Selection Implementation études APS/APD/DCE d'AHA solutions de type 4 à Bakel_SAED SN-PARIISSN-161037-CS- QCBS / Recrutement d'un consultant pour élaborer des Component A: Modernizing Quality And Cost- IDA / 61590 Post Open - National 170,940.00 0.00 Canceled 2020-03-30 2020-04-20 2020-06-03 2020-07-01 2020-07-31 2020-09-04 2020-10-09 2021-03-08 Plans d'Occupation et the institutional framework Based Selection d'Affectation des Sols (POAS) _SODAGRI SN-PARIISSN-161043-CS- QCBS / Recrutement d'un consultant pour élaborer des Component A: Modernizing Quality And Cost- Under IDA / 61590 Post Open - National 100,000.00 0.00 2020-03-25 2020-04-11 2020-04-15 2020-05-29 2020-10-02 2020-06-26 2020-11-30 2020-07-26 2020-12-14 2020-08-30 2020-10-04 2021-04-02 Plans d'Occupation et the institutional framework Based Selection Implementation d'Affectation des Sols (POAS) _SODAGRI SN-PARIISSN-161065-CS- QCBS / Recrutement d'un consultant pour élaborer les études pour la constitution d'un portefeuille de projet Component B: Financing Quality And Cost- bancable en Casamance IDA / 61590 irrigation investment Post Open - National 512,821.00 0.00 Canceled 2020-07-14 2020-08-04 2020-09-17 2020-10-15 2020-11-14 2020-12-19 2021-01-23 2021-08-21 Based Selection (revue qualité des études solutions d'aménagement existantes, réalisation APS / APD / DAO, sauvegarde environnementale et sociale)_SODAGRI SN-PARIISSN-161070-CS- QCBS / Recrutement d'un consultant pour conduire les Component B: Financing Quality And Cost- études pour l'aménagement IDA / D2560 irrigation investment Post Open - National 341,880.00 0.00 Canceled 2020-06-30 2020-04-15 2020-07-21 2020-09-03 2020-10-01 2020-10-31 2020-12-05 2021-01-09 2021-07-08 Based Selection de 400 ha de bas-fonds dans solutions le Sofaniama et Diop Kounda_SODAGRI SN-PARIISSN-161071-CS- QCBS / Recrutement d'un consultant pour conduire les Component B: Financing Etudes et le Contrôle pour Quality And Cost- IDA / 61590 irrigation investment Post Open - National 170,940.00 0.00 Canceled 2020-07-22 2020-04-11 2020-08-12 2020-09-25 2020-10-23 2020-11-22 2020-12-27 2021-01-31 2021-06-30 l'aménagement d'un ouvrage Based Selection solutions de régulation en amont du barrage de Diop Kounda _SODAGRI SN-PARIISSN-161073-CS- CQS / Recrutement d'un Component B: Financing Consultant Under consultant l'actualisation des IDA / 61590 irrigation investment Post Qualification Open - National 51,282.00 62,409.86 2020-04-15 2020-06-30 2020-05-06 2020-06-19 2020-09-28 2020-07-19 2021-01-14 2020-08-23 2020-12-21 Implementation études d'aménagement de 50 solutions Selection ha de plateau_SODAGRI SN-PARIISSN-161078-CS- QCBS / Sélection d'un consultant pour le contrôle Component B: Financing Quality And Cost- Pending des travaux des travaux de IDA / 61590 irrigation investment Post Open - National 170,940.00 0.00 2020-06-23 2020-07-14 2020-08-27 2020-09-24 2020-10-24 2020-11-28 2021-01-02 2021-07-01 Based Selection Implementation réhabilitation du barrage de solutions Diopkounda (digue et ouvrage de franchissement) SN-PARIISSN-161196-CS- QCBS / Sélection d'un consultant pour le contrôle Component B: Financing des travaux de constructions Quality And Cost- IDA / 61590 irrigation investment Post Open - National 85,470.00 0.00 Canceled 2020-06-15 2020-07-06 2020-08-19 2020-09-16 2020-10-16 2020-11-20 2020-12-25 2021-06-23 de 6 magasins de stockage et Based Selection solutions l'aménagement de 30 Petits Périmètres Maraîchers Féminins (PPMF) SN-PARIISSN-161570-CS- Component B: Financing Consultant CQS / Recrutement d'un IDA / 61590 irrigation investment Post Qualification Open - National 128,205.00 0.00 Canceled 2020-03-24 2020-04-20 2020-04-14 2020-05-28 2020-06-27 2020-08-01 2021-01-28 consultant pour élaboration solutions Selection de PAR_SODAGRI SN-PARIISSN-187937-CS- QCBS / Réhabilitation du Component B: Financing Quality And Cost- Under barrage de diopkunda et IDA / 61590 irrigation investment Post Open - National 487,582.00 0.00 2020-08-31 2020-09-29 2020-09-21 2020-11-04 2021-04-20 2020-12-02 2021-01-01 2021-02-05 2021-03-12 2022-03-12 Based Selection Implementation aménagement de 600 ha de solutions bas fonds SN-PARIISSN-160404-CS- CQS / Recrutement d'un consultant pour conduire les études APS/APD/DAO pour la revalorisation de 500 ha Component B: Financing Consultant Under d'anciens bas -fonds ou la IDA / 61590 irrigation investment Post Qualification Open - National 102,564.00 0.00 2020-09-21 2021-05-20 2020-10-12 2021-06-21 2020-11-25 2020-12-25 2021-01-29 2021-06-28 Implementation réalisation de 200 ha de solutions Selection nouveaux de type 1 dans le bassin arachidier _DBRLA et la réalisation de 78 ha de PPM féminins de type 3 SN-PARIISSN-160403-CS- CQS / Recrutement d'un consultant pour élaborer les Component B: Financing Consultant études pour la constitution IDA / 61590 irrigation investment Post Qualification Open - National 90,000.00 0.00 Canceled 2020-09-21 2020-09-14 2020-10-12 2020-11-25 2020-12-25 2021-01-29 2021-06-28 d'un portefeuille de projet solutions Selection bancable de type 1 & 3 dans le bassin arachidier_DBRLA SN-PARIISSN-202722-CS- CQS / Sélection d'un consultant pour le contrôle Component B: Financing Consultant des travaux de constructions Under IDA / 61590 irrigation investment Post Qualification Open - National 85,470.00 0.00 2020-11-05 2021-01-04 2020-11-26 2021-01-09 2021-04-07 2021-02-08 2021-03-15 2021-09-11 de 6 magasins de stockage et Implementation solutions Selection l'aménagement de 30 Petits Périmètres Maraîchers Féminins (PPMF) Page 6 SN-PARIISSN-190246-CS- CQS / Recrutement d'un consultant pour l'élaboration Component C: Knowledge Consultant d'un Plan d'Action et de IDA / 61590 management and Post Qualification Open - National 119,658.00 0.00 Canceled 2020-09-07 2020-09-12 2020-09-28 2020-11-11 2020-12-11 2021-01-15 2021-05-15 Réinstallation (PAR) pour coordination Selection l'aménagement de 400 ha de bas fonds, 50 ha de plateau et 30 ha de PPMF (Zone Sodagri) SN-PARIISSN-161217-CS- CQS / Recrutement d'un Component C: Knowledge Consultant Consultant pour la Conception IDA / 61590 management and Post Qualification Open - National 17,094.00 0.00 Canceled 2020-07-22 2020-08-12 2020-09-25 2020-10-25 2020-11-29 2021-03-29 et production du manuel de coordination Selection solution d'irrigation en français et en langues locales SN-PARIISSN-190242-CS- CQS / RECRUTEMENT D'UN CONSULTANT POUR LA RÉALISATION D'UN PLAN D'ACTION ET DE Component C: Knowledge Consultant RÉINSTALLATION (PAR) IDA / 61590 management and Post Qualification Open - National 51,282.00 0.00 Canceled 2020-09-05 2020-08-26 2020-09-26 2020-11-09 2020-12-09 2021-01-13 2021-05-13 RELATIF AUX TRAVAUX DES coordination Selection SOUS-PROJETS DANS LA ZONE DE SODAGRI DU PARIIS SN - ZIP B: RÉALISATION DE 11 KM DE PISTES. SN-PARIISSN-115320-CS- Component B: Financing Consultant CQS / Réalisation de pistes IDA / 61590 irrigation investment Post Qualification Open - National 94,020.00 0.00 Canceled 2019-07-30 2019-08-20 2019-10-03 2019-11-02 2019-12-07 2020-03-06 dans les zonzs d'intervention solutions Selection du PARIIS_SN en Casamance SN-PARIISSN-190244-CS- CQS / Recrutement d'un consultant pour l'élaboration Component C: Knowledge Consultant d'un Plan d'Action et de IDA / 61590 management and Post Qualification Open - National 85,470.00 0.00 Canceled 2020-09-07 2020-08-26 2020-09-28 2020-11-11 2020-12-11 2021-01-15 2021-05-15 Réinstallation (PAR) pour le coordination Selection Barrage Diopkounda et l'aménagement de 200 ha (Zone Sodagri) SN-PARIISSN-115321-CS- QCBS / Recrutement d'un Consultant pour la réalisation de i) étude APS d'aménagement de 1200 ha Component B: Financing Quality And Cost- du périmètre de Djida IDA / 61590 irrigation investment Post Open - National 352,414.00 0.00 Canceled 2019-08-27 2019-09-17 2019-10-31 2019-11-28 2019-12-28 2020-02-01 2020-03-07 2020-06-05 Based Selection Marietou, ii) étude solutions APS/APD/DAO pour la réhabilitation du barrage de Diopkounda et l'aménagement de 300 ha de bas-fonds et de 50 ha de plateau SN-PARIISSN-161030-CS- QCBS / Sélection d'un Component B: Financing consultant pour conduire les Quality And Cost- IDA / 61590 irrigation investment Post Open - National 90,598.00 0.00 Canceled 2020-05-28 2020-06-18 2020-08-01 2020-08-29 2020-09-28 2020-11-02 2020-12-07 2021-12-07 études d'Impact Based Selection solutions Environnementales Branche A_SAED SN-PARIISSN-161068-CS- QCBS / Recrutement d'un consultant pour conduire une Component B: Financing Quality And Cost- étude de faisabilité du IDA / 61590 irrigation investment Post Open - National 145,299.00 0.00 Canceled 2020-03-26 2020-04-11 2020-04-16 2020-05-30 2020-06-27 2020-07-27 2020-08-31 2020-10-05 2021-04-03 Based Selection périmètre de Djiddah solutions Mariétou à l'engagement d'un projet bancable_SODAGRI SN-PARIISSN-237213-CS- CQS / Recrutement d'un Component B: Financing Consultant consultant pour les études Pending IDA / 61590 irrigation investment Post Qualification Open - National 34,188.00 0.00 2021-06-23 2021-07-14 2021-08-27 2021-09-26 2021-10-31 2022-01-29 sommaires Implementation solutions Selection environnementales_Zone de DBRLA INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C-02-PARIIS-18 / étude d'identification et de Component B: Financing Individual caractérisation de sites de IDA / 61590 irrigation investment Post Consultant Limited 25,642.00 226,778.73 Signed 2018-11-05 2019-02-05 2018-11-10 2019-04-02 2018-12-01 2019-07-04 2019-01-05 2019-08-01 2019-07-04 2020-06-15 Constructions nouvelles de solutions Selection 200 ha de bas-fond et 100 ha de PPM féminin C-01-PARIIS-19 / étude d'identification et de Component B: Financing Individual caractérisation pour la IDA / 61590 irrigation investment Post Consultant Limited 85,470.00 0.00 Canceled 2018-11-28 2018-12-03 2018-12-24 2019-01-28 2019-07-27 Réhabilitation de 500 ha de solutions Selection bas-fond type 1 et de 200 ha de PIV type 3 SN-PARIISSN-115245-CS- Component C: Knowledge Individual INDV / Actualisation du cadre IDA / 61590 management and Post Consultant Limited 10,256.00 30,199.92 Signed 2019-07-26 2019-06-04 2019-07-31 2019-07-23 2019-08-21 2019-09-03 2019-09-25 2019-09-11 2019-12-24 de gestion environnementale coordination Selection et sociale SN-PARIISSN-115254-CS- INDV / Sélection d'un Individual Component A: Modernizing consultant pour l'Elaboration IDA / 61590 Post Consultant Limited 11,966.00 0.00 Canceled 2019-11-30 2019-12-05 2019-12-26 2020-01-30 2020-04-29 the institutional framework d'une stratégie de Selection développement social et genre Individual SN-PARIISSN-115323-CS- Component A: Modernizing IDA / 61590 Post Consultant Limited 46,495.70 46,151.87 Signed 2018-03-05 2018-02-05 2018-03-10 2018-03-05 2018-08-16 2018-10-16 2018-10-24 2018-10-24 2018-12-23 INDV / Etudes de référence the institutional framework Selection Page 7 SN-PARIISSN-115374-CS- INDV / Elaboration de la stratégie gestion des Component C: Knowledge Individual connaissances et du plan de IDA / 61590 management and Post Consultant Limited 12,820.00 0.00 Canceled 2019-06-28 2019-06-04 2019-07-03 2019-07-24 2019-08-28 2019-10-27 capitalisation des coordination Selection connaissances et innovations du PARIIS SN-PARIISSN-115376-CS- INDV / Diagnostic des Component C: Knowledge Individual besoins, dispositifs, acteurs, IDA / 61590 management and Post Consultant Limited 25,640.00 0.00 Canceled 2019-06-28 2019-06-04 2019-07-03 2019-07-24 2019-08-28 2019-10-27 actifs de communication, coordination Selection gestion des connaissances et formation SN-PARIISSN-115390-CS- INDV / Recrutement d'un Component C: Knowledge Individual consultant individuel pour IDA / 61590 management and Post Consultant Limited 17,000.00 16,667.91 Signed 2019-10-29 2019-09-17 2019-11-03 2019-10-27 2019-11-24 2019-12-13 2019-12-29 2020-01-02 2020-04-27 l'étude de confirmation des coordination Selection sites devant abriter les mini- piézomètres SN-PARIISSN-115393-CS- INDV / Recrutement d'un consultant pour l'élaboration Individual Component A: Modernizing d'un guide illustré sur les IDA / 61590 Post Consultant Limited 4,000.00 18,728.22 Signed 2019-10-31 2019-11-09 2019-11-05 2020-12-01 2019-11-26 2020-12-21 2019-12-31 2021-02-10 2020-03-30 the institutional framework textes législatifs et Selection réglementaires sur l'eau en langues nationales SN-PARIISSN-115408-CS- INDV / Recrutement d'un consultant pour le Diagnostic Individual Component A: Modernizing institutionnel des Associations IDA / 61590 Post Consultant Limited 17,090.00 63,155.60 Signed 2019-08-28 2019-07-26 2019-09-02 2020-01-09 2019-09-23 2020-03-06 2019-10-28 2020-05-13 2020-02-25 the institutional framework des Usagers de l'Eau (AUE) Selection existantes et proposition de leur restructuration SN-PARIISSN-138044-CS- INDV / Recrutement d'un Component C: Knowledge Individual consultant pour la revue du IDA / 61590 management and Post Consultant Limited 9,000.00 0.00 Under Review 2020-01-29 2019-12-24 2020-02-03 2020-02-24 2020-03-30 2020-06-28 manuel de passation des coordination Selection marchés du PARIIS_SN SN-PARIISSN-138079-CS- INDV / Rcrutement d'un Component C: Knowledge Individual consultant pour la revue du IDA / 61590 management and Post Consultant Limited 9,000.00 0.00 Under Review 2020-02-26 2019-12-03 2020-03-02 2020-03-23 2020-04-27 2020-06-26 manuel d'exécution technique coordination Selection du PARIIS_SN SN-PARIISSN-202337-NC- RFQ / Recrutement d'un Component C: Knowledge Individual consultant pour accompagner IDA / 61590 management and Post Consultant Limited 8,550.00 5,199.84 Signed 2020-11-04 2020-11-09 2020-11-09 2020-11-17 2020-11-30 2020-11-18 2021-01-04 2020-11-19 2021-02-03 l'Unité de Coordination de coordination Selection PARIIS_SN à la préparation de la revue à mis parcours SN-PARIISSN-115394-CS- INDV / Recrutement d'un Component C: Knowledge Individual consultant pour faire l'état des IDA / 61590 management and Post Consultant Limited 25,640.00 0.00 Canceled 2020-02-27 2020-03-03 2020-03-24 2020-04-28 2020-06-27 lieux des systèmes d'irrigation coordination Selection dans les 3 ZIP en vue de la mise en place SII ou S2I SN-PARIISSN-115284-CS- Component B: Financing Individual INDV / Recrutement de IDA / 61590 irrigation investment Post Consultant Open 200,513.00 0.00 Canceled 2018-02-05 2018-03-26 2018-04-16 2019-01-11 2020-01-11 l'expert en irrigation solutions Selection SN-PARIISSN-115288-CS- Component C: Knowledge Individual INDV / Recrutement de IDA / 61590 management and Post Consultant Open 200,513.00 0.00 Canceled 2018-02-05 2018-03-26 2018-04-16 2019-01-02 2020-01-02 l'expert en Gestion des coordination Selection connaissances SN-PARIISSN-115285-CS- Component C: Knowledge Individual INDV / Recrutement du IDA / 61590 management and Post Consultant Open 278,974.00 0.00 Canceled 2018-02-05 2018-03-26 2018-06-05 2018-06-18 2019-12-30 Coordonnateur du PARIIS coordination Selection SN-PARIISSN-115290-CS- Component C: Knowledge Individual INDV / Recrutement du IDA / 61590 management and Post Consultant Open 104,280.00 0.00 Canceled 2018-02-05 2018-09-28 2018-03-26 2018-04-16 2019-03-01 2020-02-29 comptable coordination Selection SN-PARIISSN-115294-CS- Component C: Knowledge Individual INDV / Recrutement de IDA / 61590 management and Post Consultant Open 200,513.00 0.00 Canceled 2018-02-05 2018-03-26 2018-04-16 2018-12-24 2019-12-31 l'expert en Suivi évaluation coordination Selection SN-PARIISSN-115295-CS- Component C: Knowledge Individual INDV / Recrutement du IDA / 61590 management and Post Consultant Open 200,513.00 0.00 Canceled 2018-02-01 2018-03-22 2018-04-12 2018-08-14 2019-12-31 Responsable administratif et coordination Selection financier SN-PARIISSN-115289-CS- Individual Component A: Modernizing INDV / Recrutement expert en IDA / 61590 Post Consultant Open 200,513.00 0.00 Canceled 2018-02-05 2018-03-26 2018-04-16 2018-12-20 2019-12-31 the institutional framework environnement Selection SN-PARIISSN-115299-CS- Component C: Knowledge Individual INDV / Recrutement SPM IDA / 61590 management and Post Consultant Open 200,513.00 0.00 Canceled 2018-02-01 2018-06-19 2018-07-10 2018-09-27 2019-12-31 PARIIS coordination Selection SN-PARIISSN-115297-CS- Component C: Knowledge Individual INDV / recrutement expert en IDA / 61590 management and Post Consultant Open 200,513.00 0.00 Canceled 2018-02-05 2018-03-26 2018-04-16 2019-03-06 2020-03-05 sauvegarde sociale coordination Selection SN-PARIISSN-115388-CS- Component B: Financing Individual INDV / Recrutement d'un IDA / 61590 irrigation investment Post Consultant Limited 34,188.00 0.00 Canceled 2020-01-31 2020-02-05 2020-02-26 2020-04-01 2020-09-28 consultant pour la formation solutions Selection des Organisations Paysannes SN-PARIISSN-115367-CS- Component C: Knowledge Individual INDV / Mise en place d'une IDA / 61590 management and Post Consultant Limited 51,280.00 0.00 Canceled 2019-05-29 2019-06-04 2019-06-03 2019-06-24 2019-07-29 2019-09-27 plateforme Virtuelle de coordination Selection Gestion des Connaissances Page 8 SN-PARIISSN-231293-CS- INDV / Recrutement d'un Component C: Knowledge Individual consultant pour la mise en IDA / 61590 management and Post Consultant Limited 10,256.00 0.00 Under Review 2021-05-17 2021-05-27 2021-05-22 2021-06-12 2021-07-17 2021-09-15 place d’une plateforme de coordination Selection suivi de l'exécution des marchés Page 9 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) July 9, 2010 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other July 9, 2010 methods July 9, 2010 PROCUREMENT Western Africa : Ebola Emergency Response Project PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-04-16 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152359 GPN Date: Project Name: Ebola Emergency Response Project Loan / Credit No: IDA / D0080 Ministry of Health and Social Welfare Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-MOHSW-59304-CW-RFB / Component 1: Support to the Construction of 155 bed EVD Outbreak Response Plans Single Stage - Two 12,500,000.0 Under 2020-07- IDA / D0080 Prior Request for Bids Open - International 0.00 2018-04-30 2018-04-23 2018-07-16 2018-05-03 2018-07-16 2018-04-30 2018-05-05 2018-04-25 2018-09-24 2017-08-16 2018-12-07 2018-05-17 2019-01-11 rooms Redemption Hospital and Strengthening Essential Envelope 0 Review 04 Phase I Health Services GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 6: Post-Ebola LR-MOHSW-51567-GO-RFQ Pending Strengthening of Health Request for Single Stage - One / Procurement of Teaching IDA / D0080 Post Open - International 61,009.00 0.00 Implementati 2017-06-22 2017-08-17 2018-02-13 Systems and Epidemic Quotations Envelope equipment for AMD on Preparedness LR-MOHSW-51653-GO-DIR / Pending Component 4: Provision of Procurement of UPS Standards IDA / D0080 Post Direct Selection Direct 45,000.00 0.00 Implementati 2018-04-26 2018-05-01 2018-06-05 2018-12-02 Essential Public Services for LMHRA on Component 6: Post-Ebola Under LR-MOHSW-61507-GO-RFQ Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 40,000.00 0.00 Implementati 2018-05-07 2018-04-10 2018-07-02 2018-12-29 / Printing of CHAS Ledgers Systems and Epidemic Quotations Envelope on Preparedness LR-MOHSW-117467-GO-RFQ Component 2: Human Pending / Purchase of Assorted Resources Scale up for Request for Single Stage - One IDA / D0080 Post Limited 10,000.00 0.00 Implementati 2019-06-22 2019-08-17 2020-02-13 Laptops for use by IU, PIU, Outbreak Response and Quotations Envelope on and SCM. Essential Health Services LR-MOHSW-117468-GO-RFQ Component 2: Human Pending / Purchase of Two Buses (one Resources Scale up for Request for Single Stage - One IDA / D0080 Post Limited 130,000.00 0.00 Implementati 2019-07-03 2019-08-28 2020-02-24 30-seater and one 18-seater) Outbreak Response and Quotations Envelope on for AMD Students and Staff Essential Health Services LR-MOHSW-117904-GO-DIR Component 2: Human Pending / Purchase and Installation of Resources Scale up for IDA / D0080 Post Direct Selection Direct 10,000.00 0.00 Implementati 2019-06-26 2019-07-01 2019-08-05 2020-02-01 100 KVA Transformer for AM Outbreak Response and on Dogliotti College of Medicine Essential Health Services Component 2: Human LR-MOHSW-117907-GO-RFQ Pending Resources Scale up for Request for Single Stage - One / Purchase of Motorbike for IDA / D0080 Post Limited 9,000.00 0.00 Implementati 2019-07-03 2019-08-28 2020-02-24 Outbreak Response and Quotations Envelope use by Infrastructure Unit on Essential Health Services LR-MOHSW-153688-GO-RFQ Component 6: Post-Ebola / Purchase of Desk, Chairs, Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 6,000.00 5,925.00 Signed 2020-02-12 2020-06-04 2020-04-08 2020-06-24 2020-10-05 and Cubicle for use by the Systems and Epidemic Quotations Envelope External Aid Unit Preparedness Component 6: Post-Ebola LR-MOHSW-167181-GO-RFQ Pending Strengthening of Health Request for Single Stage - One / Purchase & Installation of IDA / D0080 Post Limited 35,000.00 0.00 Implementati 2020-05-20 2020-07-15 2021-01-11 Systems and Epidemic Quotations Envelope Internet Equipment for AMD on Preparedness LR-MOHSW-167184-GO-RFQ Component 6: Post-Ebola / Purchase of Strengthening of Health Request for Single Stage - One IDA / D0080 Post Open 197,861.00 0.00 Canceled 2020-05-21 2020-07-16 2021-01-12 Chemicals/Reagents for Systems and Epidemic Quotations Envelope LMHRA Preparedness Component 6: Post-Ebola LR-MOHSW-167178-GO-RFQ Strengthening of Health Request for Single Stage - One / Purchase of Laptop IDA / D0080 Post Limited 32,500.00 32,000.00 Completed 2020-05-22 2020-04-27 2020-07-17 2020-06-05 2021-01-13 2020-07-31 Systems and Epidemic Quotations Envelope Computers for PFMU Preparedness LR-MOHSW-181076-GO-RFQ Component 6: Post-Ebola / Purchase of Laptop Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 13,705.00 7,018.00 Completed 2020-07-25 2020-06-22 2020-09-19 2020-08-04 2021-03-18 2020-08-07 Computers for Health Systems and Epidemic Quotations Envelope Financing Unit Preparedness LR-MOHSW-189011-GO-RFB Component 6: Post-Ebola Under / Purchase of Strengthening of Health Single Stage - One IDA / D0080 Post Request for Bids Open - International 197,861.00 0.00 Implementati 2020-09-30 2020-09-09 2020-10-05 2020-09-09 2020-11-16 2020-12-16 2021-01-20 2021-07-19 Chemicals/Reagents for Systems and Epidemic Envelope on LMHRA Preparedness LR-MOHSW-189007-GO-RFQ Component 6: Post-Ebola Pending / Purchase of One (1) Piece of Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 52,000.00 0.00 Implementati 2020-10-31 2020-12-26 2021-06-24 Vehicle for use by the Health Systems and Epidemic Quotations Envelope on Financing Unit Preparedness Component 6: Post-Ebola LR-MOHSW-189008-GO-RFQ Pending Strengthening of Health Request for Single Stage - One / Printing of Health Financing IDA / D0080 Post Limited 37,500.00 0.00 Implementati 2020-10-24 2020-12-19 2021-06-17 Systems and Epidemic Quotations Envelope Unit RDF Operational Manual on Preparedness LR-MOHSW-211825-GO-DIR Component 1: Support to the / Purchase of Dialysis Kit EVD Outbreak Response Plans IDA / D0080 Prior Direct Selection Direct 377,400.00 0.00 Canceled 2021-03-16 2021-01-13 2021-03-21 2021-04-25 2021-10-22 Consumables, and and Strengthening Essential Maintenance Services Health Services Page 1 LR-MOHSW-200495-GO-RFQ Component 2: Human / Purchase of Laptop Pending Resources Scale up for Request for Single Stage - One Computer, Camera, External IDA / D0080 Post Limited 4,250.00 0.00 Implementati 2020-11-07 2021-01-02 2021-07-01 Outbreak Response and Quotations Envelope Hard Drive, and Drone for use on Essential Health Services by the Infrastructure Unit Component 1: Support to the LR-MOHSW-231653-GO-RFQ Pending EVD Outbreak Response Plans Request for Single Stage - One / Procurement of Additional IDA / D0080 Post Limited 13,500.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 and Strengthening Essential Quotations Envelope Three (3) Motorbikes on Health Services Component 1: Support to the LR-MOHSW-231656-GO-DIR Under EVD Outbreak Response Plans / Purchase of Dialysis Kit, and IDA / D0080 Post Direct Selection Direct 377,400.00 0.00 Implementati 2021-03-16 2021-01-11 2021-03-21 2021-04-25 2021-10-22 and Strengthening Essential Maintenance Services on Health Services LR-MOHSW-237601-GO-RFQ Component 1: Support to the Pending / Purchase of Assorted Drugs EVD Outbreak Response Plans Request for Single Stage - One IDA / D0080 Post Open - International 50,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 and Supplies for Dialysis and Strengthening Essential Quotations Envelope on Machine Usage Health Services NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-75982-NC-RFQ Component 6: Post-Ebola / Printing of Health Sector Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 15,000.00 13,000.00 Completed 2018-09-08 2018-09-12 2018-11-03 2018-12-12 2019-05-02 2018-11-16 Report for Health Financing Systems and Epidemic Quotations Envelope Unit Preparedness Component 6: Post-Ebola LR-MOHSW-167172-NC-RFQ Pending Strengthening of Health Request for Single Stage - One / Provision of Internet IDA / D0080 Post Limited 15,000.00 0.00 Implementati 2020-05-20 2020-07-15 2021-01-11 Systems and Epidemic Quotations Envelope Services to AMD on Preparedness LR-MOHSW-237630-NC-RFP / Hiring of Security Firm for Component 1: Support to the Pending the Provision of Security EVD Outbreak Response Plans Request for Single Stage - One IDA / D0080 Post Limited 21,600.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2022-04-18 Services at the New and Strengthening Essential Proposals Envelope on Redemption Hospital Health Services Construction Site CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-167159-NC-RFP Component 6: Post-Ebola / Hiring of Design Strengthening of Health Least Cost Pending IDA / D0080 Post Open - International 500,000.00 0.00 2020-05-17 2020-06-07 2020-07-21 2020-08-18 2020-09-17 2020-10-22 2020-11-26 2021-05-25 Consultant_Redemtion Phase- Systems and Epidemic Selection Implementation 2 Designs Preparedness INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-51658-CS-INDV Individual / Recruitment of Impact Component 4: Provision of Pending IDA / D0080 Post Consultant Open 108,000.00 0.00 2017-07-12 2017-08-30 2017-09-20 2017-10-25 2018-04-23 Evaluator (HMER) Health Work Essential Public Services Implementation Selection Force Program LR-MOHSW-59322-CS-INDV Component 2: Human Individual / Recruitment of Research Resources Scale up for Pending IDA / D0080 Post Consultant Open 20,400.00 0.00 2018-07-25 2018-09-12 2018-10-03 2018-11-07 2019-05-06 Manager (Health Workforce Outbreak Response and Implementation Selection Program)HMER Essential Health Services LR-MOHSW-59324-CS-INDV Component 2: Human / Recruitment of Health Individual Resources Scale up for Pending Management Information IDA / D0080 Post Consultant Open 8,400.00 0.00 2018-07-31 2018-09-18 2018-10-09 2018-11-13 2019-05-12 Outbreak Response and Implementation System Officer (Health Selection Essential Health Services Workforce Program)HMER LR-MOHSW-59326-CS-INDV Component 2: Human / Recruitment of Health Individual Resources Scale up for Pending Management Information IDA / D0080 Post Consultant Open 8,400.00 0.00 2018-06-28 2018-08-16 2018-09-06 2018-10-11 2019-04-09 Outbreak Response and Implementation System Officer (Health Selection Essential Health Services Workforce Program)HMER LR-MOHSW-59319-CS-INDV Component 2: Human Individual / Recruitment of Human Resources Scale up for Pending IDA / D0080 Post Consultant Open 8,400.00 0.00 2018-07-25 2018-09-12 2018-10-03 2018-11-07 2019-05-06 Resource Inforation Officer Outbreak Response and Implementation Selection (HMER) Essential Health Services MOH-REF-12 / Recruit TA to Component 2: Human Individual develop standards for Resources Scale up for Pending IDA / D0080 Post Consultant Open 62,200.00 0.00 2018-06-28 2018-08-16 2018-09-06 2018-10-11 2019-04-09 Physicians and Physician Outbreak Response and Implementation Selection Assistant for LMDC Essential Health Services LR-MOHSW-59321-CS-INDV Component 2: Human Individual / Recruit TA to develop Resources Scale up for Pending IDA / D0080 Post Consultant Open 19,500.00 0.00 2018-07-25 2018-09-12 2018-10-03 2018-11-07 2019-05-06 internship programs and Outbreak Response and Implementation Selection systems guidelines for LMDC Essential Health Services Component 2: Human LR-MOHSW-59327-CS-INDV Individual Resources Scale up for Pending / Recruitment of Internship IDA / D0080 Post Consultant Open 25,350.00 0.00 2017-07-28 2017-09-15 2017-10-06 2017-11-10 2018-05-09 Outbreak Response and Implementation Progrram Director for LMDC Selection Essential Health Services Component 2: Human Individual MOH-REF-20 / Recruitment Resources Scale up for Pending IDA / D0080 Post Consultant Open 56,000.00 0.00 2018-02-28 2018-04-18 2018-05-09 2018-06-13 2018-12-10 of Associate Dean for AMD Outbreak Response and Implementation Selection Essential Health Services Page 2 Component 2: Human LR-MOHSW-59325-CS-INDV Individual Resources Scale up for Under / Recruitment of Regional HR IDA / D0080 Post Consultant Open 46,800.00 0.00 2018-07-31 2018-05-02 2018-09-18 2018-10-09 2018-11-13 2019-05-12 Outbreak Response and Implementation Officers (4) Selection Essential Health Services Component 2: Human LR-MOHSW-59318-CS-INDV Individual Resources Scale up for Under / Recruitment of Payroll IDA / D0080 Post Consultant Open 11,250.00 0.00 2018-06-28 2018-05-02 2018-08-16 2018-09-06 2018-10-11 2019-04-09 Outbreak Response and Implementation Officers Selection Essential Health Services Component 1: Support to the Individual MOH-REF-22 / Recruitment EVD Outbreak Response Plans Pending IDA / D0080 Post Consultant Open 15,300.00 0.00 2017-12-16 2018-02-03 2018-02-24 2018-03-31 2019-03-26 of HR Planning Officer and Strengthening Essential Implementation Selection Health Services LR-MOHSW-99577-CS-CDS / Component 1: Support to the Consultancy for Equipment EVD Outbreak Response Plans Under Assessment & The IDA / D0080 Post Direct Selection Direct 49,280.00 0.00 2019-02-18 2019-02-06 2019-02-28 2019-05-04 2019-10-31 and Strengthening Essential Implementation Development of Specifications Health Services for New Redemption Hospital. LR-MOHSW-106729-CS-CDS / Hiring of Consultant to Component 1: Support to the Provide Outstanding Design EVD Outbreak Response Plans Under and Supervision Consultant IDA / D0080 Post Direct Selection Direct 490,000.00 0.00 2019-04-05 2019-03-26 2019-04-15 2019-06-19 2019-12-16 and Strengthening Essential Implementation Services for the New Health Services Redemption Hospital Phase-1 Project Component 2: Human LR-MOHSW-117462-CS-CDS Resources Scale up for Under / Recruitment of Pediatric IDA / D0080 Post Direct Selection Direct 36,882.00 0.00 2019-06-01 2016-05-16 2019-06-11 2019-06-06 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-1 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117464-CS-CDS Resources Scale up for Under / Recruitment of Pediatric IDA / D0080 Post Direct Selection Direct 25,382.00 0.00 2019-06-01 2016-05-16 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-2 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117461-CS-CDS Resources Scale up for Pending / Recruitment of OB/GYN IDA / D0080 Post Direct Selection Direct 16,921.00 0.00 2019-06-01 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-1 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117463-CS-CDS Resources Scale up for Pending / Recruitment of OB/GYN IDA / D0080 Post Direct Selection Direct 16,921.00 0.00 2019-06-01 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-2 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117466-CS-CDS Resources Scale up for Pending / Recruitment of Surgical IDA / D0080 Post Direct Selection Direct 16,921.00 0.00 2019-06-01 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-1 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117465-CS-CDS Resources Scale up for Pending / Recruitment of Surgical IDA / D0080 Post Direct Selection Direct 16,921.00 0.00 2019-06-01 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-2 for LCPS Essential Health Services LR-MOHSW-147196-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 120,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-08-01 2019-11-15 2020-05-13 Specialist Faculty in Outbreak Response and Implementation Surgery_EDEIK Essential Health Services LR-MOHSW-147202-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 84,000.00 0.00 2019-10-01 2019-11-19 2019-10-11 2019-08-08 2019-12-15 2020-06-12 Specialist Faculty in Outbreak Response and Implementation Surgery_MUSHAM Essential Health Services LR-MOHSW-147212-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 120,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-08 2019-11-15 2020-05-13 Specialist Faculty Chair in Outbreak Response and Implementation Pediatrics_FINJO Essential Health Services LR-MOHSW-147213-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 84,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-08 2019-11-15 2020-05-13 Specialist Faculty in Outbreak Response and Implementation Pediatrics_READI Essential Health Services LR-MOHSW-147200-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 84,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-08 2019-11-15 2020-05-13 Specialist Faculty in Outbreak Response and Implementation Pediatrics_MAGDA Essential Health Services LR-MOHSW-147204-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 84,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-08-08 2019-11-06 2020-05-04 Specialist Faculty in Obstetrics Outbreak Response and Implementation and Gynecology_WODUV Essential Health Services LR-MOHSW-147201-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 120,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-10 2019-11-15 2020-05-13 Specialist Faculty in Obstetrics Outbreak Response and Implementation and Gynecology_ETEGHA Essential Health Services LR-MOHSW-147215-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 120,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-10 2019-11-15 2020-05-13 Specialist Faculty Chair in Outbreak Response and Implementation Internal Medicine_SUNCHI Essential Health Services LR-MOHSW-167182-CS- Component 6: Post-Ebola Individual INDV / Hiring of an Strengthening of Health Pending IDA / D0080 Post Consultant Open 256,752.00 0.00 2020-05-17 2020-07-05 2020-07-26 2020-08-30 2021-02-26 International Procurement Systems and Epidemic Implementation Selection Consultant for IFISH Preparedness Component 2: Human LR-MOHSW-201921-CS- Individual Resources Scale up for Pending INDV / Hiring of Project IDA / D0080 Post Consultant Direct 78,000.00 0.00 2020-03-31 2020-04-10 2020-05-01 2020-06-05 2022-03-31 Outbreak Response and Implementation Manager_MTKF_PIU_MOH Selection Essential Health Services Page 3 LR-MOHSW-201926-CS- Component 2: Human Individual INDV / Hiring of Assistant Resources Scale up for Pending IDA / D0080 Post Consultant Direct 82,353.06 0.00 2020-10-01 2020-10-11 2020-11-01 2020-12-06 2022-03-31 Project Outbreak Response and Implementation Selection Manager_PIU_MOH_HFN Essential Health Services Component 2: Human LR-MOHSW-201923-CS- Individual Resources Scale up for Pending INDV / Hiring of Procurement IDA / D0080 Post Consultant Direct 52,941.24 0.00 2020-10-01 2020-10-11 2020-11-01 2020-12-06 2022-03-31 Outbreak Response and Implementation Officer_PIU_MOH_MAS Selection Essential Health Services LR-MOHSW-201922-CS- Component 2: Human Individual INDV / Hiring of Resources Scale up for Pending IDA / D0080 Post Consultant Direct 50,000.04 0.00 2020-10-01 2020-10-11 2020-11-01 2020-12-06 2022-03-31 Administrative & Finance Outbreak Response and Implementation Selection Officer_EJSK Essential Health Services LR-MOHSW-237608-CS- Component 2: Human Individual INDV / Contract Addendum Resources Scale up for Under IDA / D0080 Post Consultant Direct 70,450.00 0.00 2021-06-06 2021-06-02 2021-06-16 2021-07-07 2021-08-11 2022-02-07 for the Hiring of Anatomy Outbreak Response and Implementation Selection Faculty for the AMD_ANAT Essential Health Services LR-MOHSW-237611-CS- Component 2: Human Individual INDV / Contract Addendum Resources Scale up for Under IDA / D0080 Post Consultant Direct 70,450.00 0.00 2021-06-07 2021-06-02 2021-06-17 2021-07-08 2021-08-12 2022-02-08 for the Hiring of Biochemistry Outbreak Response and Implementation Selection Faculty for the AMD_BIOCH Essential Health Services LR-MOHSW-237614-CS- Component 2: Human Individual INDV / Contract Addendum Resources Scale up for Under IDA / D0080 Post Consultant Direct 70,450.00 0.00 2021-06-07 2021-06-02 2021-06-17 2021-07-08 2021-08-12 2022-02-08 for the Hiring of Physiology Outbreak Response and Implementation Selection Faculty_AMD_PHYSIO Essential Health Services LR-MOHSW-237619-CS- Component 2: Human Individual INDV / Contract Addendum Resources Scale up for Under IDA / D0080 Post Consultant Direct 70,450.00 0.00 2021-06-07 2021-06-02 2021-06-17 2021-07-08 2021-08-12 2022-02-08 for the Hiring of Histology Outbreak Response and Implementation Selection Faculty for the AMD_HIST Essential Health Services LR-MOHSW-237621-CS- INDV / Hiring of Chair Component 2: Human OB/GYN Faculty /Consultant Individual Resources Scale up for Pending for LCPS IDA / D0080 Post Consultant Direct 78,550.00 0.00 2021-06-14 2021-06-24 2021-07-15 2021-08-19 2022-02-15 Outbreak Response and Implementation Contract Addendum for the Selection Essential Health Services Hiring of Chair OB/GYN Faculty for the LCPS__OB/GYN LR-MOHSW-237626-CS- INDV / Hiring of OB/GYN Component 2: Human Individual Faculty /Consultant for LCPS Resources Scale up for Pending IDA / D0080 Post Consultant Direct 65,050.00 0.00 2021-06-13 2021-06-23 2021-07-14 2021-08-18 2022-02-14 Contract Addendum for the Outbreak Response and Implementation Selection Hiring of OB/GYN Faculty for Essential Health Services the LCPS Component 2: Human LR-MOHSW-237628-CS- Individual Resources Scale up for Pending INDV / Hiring of Pediatrics IDA / D0080 Post Consultant Direct 65,050.00 0.00 2021-06-13 2021-06-23 2021-07-14 2021-08-18 2022-02-14 Outbreak Response and Implementation Faculty/Consultant for LCPS Selection Essential Health Services Page 4 Procurement Plan For Integrated Development for Source Sustainability and Climate Resilient Rain-fed Agriculture Project A World Bank Financed Project Project ID: P165129 [Procurement Plan Period: First 18 months of the Project] Covering the Period: January 2020 to June 2021 Submitted By Project Management Unit [PMU] Himachal Pradesh Forest Department Government of Himachal Pradesh India 2 3 PROCUREMENT PLAN Country: INDIA Borrower: Government of India on behalf of Government of Himachal Pradesh Project Name: Integrated Development for Source Sustainability and Climate Resilient Rain-fed Agriculture Project Project Implementation Agency: Project Management Unit [PMU], Himachal Pradesh Forestry Department [HPFD], Government of Himachal Pradesh Date of General Procurement Notice: December 18, 2019 Bank’s Approval Date of the Procurement Plan: Original … Revision 1: Revision 2: Date of the Procurement Plan: December 2019 Period covered by this Procurement Plan: January 2020 to June 2021 Applicable Procurement Rules. The Procurement of goods, works, consulting and non-consulting services to be financed by the Loan will be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers [dated July 2016; revised November 2017 and August 2018], and the provisions of the Loan Agreement. If there is conflict between government decrees, rules, and regulations and the Bank Procurement Regulations, then Bank’s Procurement Regulations shall prevail. The project will be subject to World Bank Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants [“Anti-Corruption Guidelines”], dated October 15, 2006 and revised in January 2011 and as of July 1, 2016. The project will use the online tool Systematic Tracking of Exchanges in Procurement [STEP] to prepare, clear, and update its procurement plan, for monitoring procurement activities and for communication between the Borrower and the Bank. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under Paragraph 4.4 of the Procurement Regulations are set forth in STEP. Unless otherwise agreed with the World Bank, the World Bank’s Standard Procurement Documents [SPD], Requests for Proposals, and Forms of Consultant Contract will be used. Procurement under national procedures will be carried out based on National Procurement Procedures [NPP] conditions agreed with the Government of India. Procurement estimated at Indian Rupees [INR] 5 Lakhs and above will be submitted through government eProcurement systems provided by NIC 4 www.hptender.gov.in which have been assessed and deemed acceptable by the Bank against Multilateral Development Bank [MDB] requirements. Financial Management [FM] Manual. The FM Manual prepared for the project shall have a separate chapter on Procurement which will provide clear guidance on applicable procurement arrangement, procedures and thresholds, and shall be made available on the project website. Community Operations Manual [COM]. The COM prepared for the project will have clear directives for the community [GPs/individual beneficiaries] with regard to eligible procurement expenditures and agreed procurement arrangements, procedures and thresholds, and shall be made available on the project website. This will serve as a guidebook for procurement, with a view to providing operating instructions and bring in greater transparency and predictability in procurement procedures under the Project. Procurement Arrangements and Profile. Procurement under the Project will be carried out at the central level by the Project Management Unit [PMU] headed by the Chief Project Director [CPD] established for the Project, at the District level by the District Project Officers assisted by the Accounts Assistant at the District Level in each of the 10 District Project Offices [DPOs] located in the Districts covered under the Project [Shimla, Solan, Sirmour, Bilaspur, Hamirpur, Mandi, Kullu, Chamba, Kangra and Una], and by beneficiary GPs [supported by DPOs] at the GP level, in accordance with their approved Gram Panchayat Resource Management Plans [GP-RMP]/MG/OMIF. Officials of the PMU have prior experience of implementing a World Bank financed project and have also undergone training in STEP. GPs will need to be capacitated and provided basic procurement training on applicable procurement procedures and procurement documentation requirements outlined in COM, before initiating their procurements. To meet the readiness requirements of the Department of Economic Affairs [DEA] of the Government of India, the Project has already initiated and awarded contract for critical consultancy package for Environmental and Social Assessment to be retroactively financed by the Bank. The project envisages procurement of low-risk, low-value goods, works and services as below: a. Goods and Non-Consulting Services to be procured under the project are likely to include the following. At State/PMU level, purchase of IT Equipment such laptops, computers, printer, etc., procurement of printing services for IEC, office vehicles, office furniture, etc. are envisaged. At District and GP level, procurement activities will include procurement of Barbed Wire, U/Staple, Tools, Gunny Bags, Vermicompost/ Farm yard Manure, Sand, Seeds, Wooden posts/ poles, Seedlings, Grass tufts, Sign boards/hand prints, seed testing instrument, Seed, Fertilizer, Pesticide, Livestock - Small and Large Ruminants, Agricultural Tools and Implements, equipment, Farm machinery, e.g., power tiller, chaff cutters, pipes, tarpaulins, Medicines, supplements, sprinklers, seedlings, etc. b. Procurement of Minor Civil Works is likely to include the following. At State/ PMU level, procurement of minor civil works will include extension, refurbishment and repair of office buildings, etc. At District and GP level, procurement activities will include procurement of works for construction of Water storage tanks, water channels, vermicompost pits, livestock Mangers, foot bridges, water lifting pumps, GI pipes, accessories, installation of ropeways, Ponds, Check Dams, Subsurface Dykes, Sump Wells etc. and labor contracts for preparing land 5 for nursery, preparing nursery beds, water tank, works of filling gunny bags, sowing of seeds, preparing temporary nursery sheds, watering, hoeing, weeding, , fencing, bush cutting, pit digging, planting seedlings, preparing contour trenches, planting grass tufts, drainage line treatment works, fire management works, allowances and incentives for fire management, Spring development, eradication of exotic weed- lantana, etc. It may be noted that civil works at GP level are demand driven. There are no major civil works contracts envisaged in the project. c. Consultancy Services to be procured under the project are likely to include services for developing a web-based portal for Integrated Financial Management Information System [IFMS], Water Monitoring and Modelling, Value Chain Scoping Studies, Technical Support Study for addressing the needs of Transhumant, M and E, MIS, Baseline Survey, External and Internal Audit, Third Party Verification agent to verify achievement of Disbursement Related Results [DLR]s, need based assessments and studies, individual experts, etc. No consultancy services contracts envisaged at the District/Sub-district levels. The project includes several features of a decentralized, demand-driven project, and activities to be taken up at the community level by selected beneficiaries shall be as per the GP-RMP approved by the PMU of the HP Forestry Department/MG/OMIF. The threshold of procurement activities at community level is expected not to exceed Request for Quotation [RFQ] threshold. Community-level procurement shall follow Community-Driven Development [CDD] arrangements as per the Bank’s Procurement Regulations and as outlined in the Community Operations Manual [COM] currently under preparation. Given other on-going government programs, the activities to be funded following COM shall be identified upfront to avoid double-dipping and will require very close monitoring and oversight. Project Procurement Strategy for Development [PPSD] and Procurement Plan. According to the requirement of the Regulations, a Project Procurement Strategy for Development [PPSD] has been developed, based on which the Procurement Plan for the first 18 months has been prepared. The PPSD describes how procurement in this project will support the Project Development Objective [PDO] and deliver value for money under a risk-based approach. It provides adequate supporting market analysis for the selection methods detailed in the procurement plan. The procurement plan specifies for each contract: [i] a description of the activities/contracts; [ii] selection methods to be applied; [iii] estimated cost; [iv] time schedules; [v] World Bank review requirements; and [vi] any other relevant procurement information. PMU shall submit to the World Bank, for its review and approval, any updates of the procurement plan approved by the World Bank. The project will use Systematic Tracking of Exchanges in Procurement [STEP] system for all its procurement activities carried out at the PMU [Centre] and District levels. Summary from PPSD. The project is preparing its Procurement Strategy document. As per the draft document, the project’s total value is US $100 million of which procurement spend is approximately 80 %. Extensive market analysis has been carried out for procurement packages and decisions on packages are made to ensure adequate participation of bidders. Consultancy contracts are framed based on market research and packaging decided in terms of scope of services and period. Based on the need assessment, the project has decided to 6 use Government e Marketplace [GeM]1 for procurement of Goods up to US $100,000 and as mentioned under the paragraph in the Procurement Plan on National Procurement Procedures. Procurement Capacity Building. Though project staff has past experience of implementing World Bank financed HP Mid-Himalayan Watershed Development Project [HPMHWDP] governed by the Bank’s Procurement Guidelines, however, they need to be exposed to the Procurement Regulations applicable to the Project. HP Forestry Department will be sending key procurement staff of PMU and DPOs to the Indian Institute of Management [IIM], Lucknow or the Administrative Staff College of India [ASCI], Hyderabad from time to time to attend procurement training on World Bank Procurement Framework [PF] applicable to the project. Presently, project staff from PMU and two DPOs will be attending the two-week residential training program on World Bank Procurement Regulations conducted at ASCI, Hyderabad in February 2020. These officials will subsequently provide training to other project staffs prior to implementation of the procurement activities in the project. The PMU/DPOs/APOs will also provide basic procurement training to GPs/Beneficiaries once the Gram Panchayat Resource Management Plan [GP-RMP] is approved by DPO/PMU, and before commencing implementation of GP-RMP. The project officials can also avail of the free Massive Open Online Course on public procurement www.procurementlearning.org offered by the Bank to build their capacity. The Bank had already conducted one training on STEP for PMU officials and will organize STEP training again on need basis for the concerned DPOs staff in near future. Procurement Planning. For each contract to be financed by the Loan, the different procurement methods or consultant selection methods to be used, the need for pre-qualification, estimated costs, prior review requirements, and time frame will be reflected in the Procurement Plan to be agreed between the Borrower and the Bank team. The Procurement Plan will be uploaded in STEP by PMU/DPOs and the approved procurement plan will be disclosed on the project website and Bank’s external website. The procurement plan for the first 18 months of project implementation and all its updates will be submitted to the Bank through STEP, and will lay out the appropriate, fit for purpose market approach and selection methods for procurement of goods, works, non-consulting and consulting services financed by the Bank. It will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity. eProcurement. Currently, the Himachal Pradesh Forestry Department of the Government of Himachal Pradesh is using e-procurement system for its procurement. However, PMU housed in the Forestry Department will be carrying out procurement using eProcurement for the first time in the project, therefore, their capacity building needs to be done for eProcurement. The project will make use of Government of India’s National Informatics Centre [NIC] platform assessed by the Bank against Multilateral Development Bank [MDB] requirements for procurements estimated at INR 5 Lakhs and above. Advance Contracting with Retroactive Financing. For effective project implementation and start-up, the project has initiated advance contracting of critical consultancies for Preparation of Environmental and Social Framework [ESF] and Project Implementation Plan [PIP], and procurement of small value goods such 1 https://gem.gov.in/ 7 as tools, gunny bags, seeds, IT equipment and accessories, vehicles, etc.] and works [very small value labor contracts for Development of Nurseries [52 nos.] in 26 clusters in 10 Districts covering 428 GPs. The total value of this spend is approximately 1.2 % of the Bank loan. Payment made by PMU/HPFD for these contracts following World Bank procurement procedures during the 12 months prior to the tentative Loan signing date shall be eligible for retroactive financing. Record Keeping. All records pertaining to award of tenders/selection of consultants, including tender notification/advertisement, register pertaining to sale and receipt of bids, bid/proposal opening minutes, bid/technical and financial evaluation reports, comparative statements, Goods, Receipt Note [GRN] and all correspondence pertaining to bid evaluation, communication sent to/with the Bank in the process, bid securities, and approval of invitation/evaluation of bids/proposals would be maintained by the PMU and at DPO/GP level. Contract Management. The PMU, HPFD will be responsible for overall procurement and contract management under the project. At the Centre, procurement staff will be responsible for contract monitoring and supervision of contracts awarded by PMU. At DPO level, contract monitoring and supervision will be done by technical staff at DPOs/APOs level [Agriculture, Animal Husbandry/Engineering staff of technical wing of DPO level and Forest Extension and Social Extension staff at APO level] to ensure timely delivery of quality outputs from the procurement contracts in the project areas. All payments will be made by DPOs for district and sub-district level procurements after receipt of Goods receipt Note [GRN]. Work Completion Certificates, etc. The Integrated Financial Management Information System [IFMIS] being developed under the Project will facilitate monitoring of various procurement activities in terms of physical and financial achievements on a monthly basis. The day to day monitoring of procurement activities will be done by APOs/DPOs at field level which will be updated in the online web-based system at district level and will be reviewed by PMU at the Centre. Complaint Handling Mechanism. A complaint handling mechanism to address procurement-related complaints under the Project will be developed and implemented by the PMU/DPOs to the satisfaction of the Bank. Upon receipt of complaints, immediate action would be initiated to acknowledge the complaint and to redress it within a reasonable timeframe. All complaints will be addressed at levels higher than the level at which the procurement process was undertaken, or the decision was taken. Any complaint received will also be forwarded to the Bank for information, and the Bank would be kept informed after the complaint is redressed. Leased Assets: Not Applicable Procurement of Secondhand Goods: Not Applicable Domestic Preference: The provision of domestic preference will be applied in the evaluation of bids in accordance with Annex VI of the Regulations. Procurement Thresholds and Prior Review Thresholds. The table below describes various procurement methods to be used for activities financed by the Loan. 8 Table 1: Procurement Thresholds Procurement approach and method Thresholds [US$ equivalent] Open International [Goods, IT, and >10 million Non-consulting services] – Request for Bids [RFB] Open National [Goods, IT, and Non- >100,000 and up to 10 million consulting services] – Request for Bids [RFB] National Request for Quotation Up to 100,000 [RFQ] – [Goods/Works/Non- consulting Services] Open International [Works] – >40 million Request for Bids [RFB] Open National [Works] - Request for >100,000 and up to 40 million Bids [RFB] Direct Selection With prior agreement, based on justification Framework Agreement For Goods/Works/Non-consulting services: According to paragraphs 6.57-6.59 of Section VI of the Regulations. For Consulting services: According to paragraph 7.33 of Section VII the Regulations. Force Account In accordance with paragraphs 6.54 and 6.55 of Section VI of the Procurement Regulations, and with prior agreement in Procurement plan with the Bank. Consulting Services [Firms] CQS: As per requirements of paragraphs 7.11 and 7.12 of Section VII of the Regulations. LCS, FBS: in justified cases QCBS, QBS: in all other packages Shortlist of National Consultants Up to 800,000 Procurement prior-review thresholds2. Based on the current procurement risk rating of ‘Moderate’, the World Bank will prior review the following contracts: (a) Works [including turnkey, supply and installation of plant and equipment and PPP]: All contracts more than US $15 million equivalent 2 Determination of whether a contract meets the prior review threshold is based on : (i) the total value of the contract, including all taxes and duties payable under the contract; (ii) a contract whose cost estimate was below the Bank’s prior review threshold is subject to prior review if the price of the lowest evaluated responsive bid (or, in the case of consulting services, the financial offer of the selected firm) exceeds such threshold at the bid evaluation stage; and (iii) in the case of a slice and package arrangement, the prior review threshold is determined based on the aggregate value of individual contracts to be awarded under such arrangement. 9 (b) Goods and Information Technology: All contracts > US $4 million equivalent (c) Non-consulting Services: All contracts > US $4 million equivalent (d) Consulting Services: Firms: All contracts >US $2 million equivalent (e) Consulting Services: Individuals: All contracts > US $400,000 equivalent (f) Direct Selection: The justification of Direct Selection for all contracts The above thresholds are for the initial 18-month implementation period. Based on the procurement performance of the project, these thresholds may be subsequently modified. Even for large-value post review cases, the inputs of the World Bank on technical specifications will be obtained by the project. Irrespective of the thresholds, Terms of Reference shall be prior reviewed by Bank. The prior review thresholds will also be indicated in the Procurement Plan. The Procurement Plan will be subsequently updated annually [or at any other time if required] and will reflect any change in the prior review thresholds. The details of National Procurement Procedures are outlined in the Procurement Plan. Prior review contracts. In the case of contracts subject to prior review, PMU, HPFD/DPOs will seek the World Bank’s no objection before granting/agreeing to: [a] an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; [b] any substantial modification of the scope of Works, goods, IT system; non-consulting services, or consulting services and other significant changes to the terms and conditions of the contract; [c] any variation order or amendment [except in cases of extreme urgency] that, singly or combined with all variation orders or amendments previously issued, increases the original contract amount by more than 15 percent; and [d] the proposed termination of the contract. Complaints received in all prior review cases shall be sent to Bank for review and the response to the complaint in such cases, shall be cleared with the Bank. Complaints with allegations of fraud and corruption, shall be shared with Bank, irrespective of the thresholds. Disclosure of procurement information. The following documents shall be disclosed on the project/state websites: [a] Procurement Plan and its updates; [b] an invitation for bids for procurement of Works, Goods, IT system procurement and non-consulting services; [c] request for expression of interest for selection/hiring of consulting services; [d] contract awards of Works, Goods, IT system procurement and non-consulting services procured following international and national procedures; [e] a list of contracts/purchase orders placed following RFQ [Request for Quotation] procedures on a quarterly basis; [f] a list of contracts following direct contracting [DC] on a quarterly basis; [g] an annual financial and physical progress report of all contracts; and [h] an action taken report on the complaints received on a quarterly basis. The following details shall be sent to the World Bank for publishing on the United Nations Development Business and the World Bank external website: [a] Specific Procurement Notice [i.e., invitation for bids] for procurement of Works, Goods, IT system procurement and non-consulting services using open international procedures; [b] Requests for Expression of Interests above US $800,000; [c] contract award details of all procurement of Works, Goods, IT system procurement and non-consulting services using open international procedure; and [d] a list of contracts/purchase orders placed following DC procedures on a quarterly basis. Further, the implementing agency will also publish on their websites any information required under the provisions of ‘suo moto’ disclosure as specified by the Right to Information Act. 10 National Procurement Procedure Conditions. National competition for the procurement of Works, Goods, IT system procurement and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3–5.5 of Section V of the Regulations and the following provisions: I. Only the model bidding documents for National Competitive Procurement [NCP] agreed with the GOI Task Force [and as amended for time to time], shall be used for bidding. II. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. III. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises or enterprises from any given State. IV. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. V. Government e-Marketplace [GeM] set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations [RFQ] method. VI. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. VII. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. VIII. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. IX. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. X. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social [including sexual exploitation and abuse and gender-based violence], health and safety [“ESHS”] risks and impacts. Oversight and Monitoring by the Bank. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. The Bank may conduct, at any time, Independent Procurement Reviews [IPRs] of all the contracts financed under the loan. High risk procurements, if any, will be identified for increased procurement and contract management support and indicated in the procurement plan. Bank team will provide additional due diligence and independent review of the contract performance of such identified procurements. 11 Procurement Review by the PMU, HPFD. Independent procurement post review [PPR] with reporting requirements and agreed with the Bank [As per Para 4 of Annex II of the Procurement Regulations] will be undertaken for the project for PMU’s own internal due diligence. PMU will hire PPR consultants as per Terms of Reference and reporting requirements agreed with the Bank to conduct PPR of PMU and DPOs on a half yearly basis. Other Special Selection Arrangements/Requirement Procurement by communities will be governed by the procedures outlined in the Community Operations Manual [COM] currently under preparation and in accordance with Paras 6.52 and 6.53 of Section VI of the Regulations. COM will be disclosed on the Project website. Procurement Plan as per STEP Tables: 12 PROCUREMENT India : Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2020-10-20 Revised Plan Date(s): (comma delineated, leave blank if none) 2021-06-01 Project ID: P165129 GPN Date: 2019-12-19 Project Name: Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh Loan / Credit No: IBRD / 90410 D Executing Agency(ies): istrict Project Office, Una, Himachal Pradesh Forestry Department WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-DPO, UNA-179744-CW- RFQ / Site development of 7 Component 1. Sustainable number of new nurseries at Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 12,000.00 11,783.30 Completed 2020-06-17 2020-02-13 2020-08-12 2020-02-17 different location of District Quotations Envelope 25 Management Una and Kangra under DPO Una in FY 2019-20 & 2020- 21 IN-DPO, UNA-179758-CW- Component 1. Sustainable Request for Single Stage - One 2020-10- RFQ / Nursery seedling IBRD / 90410 Land and Water Resource Post Limited 49,305.00 55,167.23 Completed 2020-06-17 2020-02-20 2020-08-12 2020-08-01 Quotations Envelope 15 production Management IN-DPO, UNA-180012-CW- RFQ / Forestry planting Along drainage line (1100 plants per Component 1. Sustainable Request for Single Stage - One 2021-02- ha) in 133 ha area involving IBRD / 90410 Land and Water Resource Post Limited 120,000.00 105,590.25 Signed 2020-06-19 2020-06-25 2020-08-14 2020-08-13 Quotations Envelope 10 25 jobs at different locations Management in DPO Una during FY 2020- 21 IN-DPO, UNA-180013-CW- RFQ / forestry Plantations Component 1. Sustainable under Re- afforestation Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 95,000.00 63,347.53 Signed 2020-06-19 2020-06-25 2020-08-14 2020-08-13 Scheme (in open forest 800 Quotations Envelope 10 Management plants per ha) area 117 ha. at different locations in DPO Una IN-DPO, UNA-180016-CW- RFQ / forestry Plantations Component 1. Sustainable under Enrichment Scheme Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 123,500.00 50,397.85 Signed 2020-06-19 2020-06-25 2020-08-14 2020-08-13 (400 plants per ha), area 192 Quotations Envelope 10 Management ha at different locations and sites in DPO Una IN-DPO, UNA-180017-CW- RFQ / Primary Water Harvesting & Storage ponds Component 1. Sustainable Request for Single Stage - One 2020-12- with capacity of IBRD / 90410 Land and Water Resource Post Limited 9,800.00 5,336.08 Signed 2020-09-07 2021-02-11 2020-11-02 2021-03-03 Quotations Envelope 31 approximately 1300 cum shall Management be constructed in the project area at different locations IN-DPO, UNA-180131-CW- RFQ / Fencing work for New Component 1. Sustainable Request for Single Stage - One 2020-09- plantations to be raised in FY IBRD / 90410 Land and Water Resource Post Limited 171,000.00 194,450.87 Signed 2020-06-20 2020-06-20 2020-08-15 2020-08-11 Quotations Envelope 30 2020-21 for 41 jobs at Management different locations in DPO Una IN-DPO, UNA-180145-CW- RFQ / Contour trenches in Component 1. Sustainable plantation areas i/c grass Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 57,200.00 65,238.83 Signed 2020-06-20 2020-06-25 2020-08-15 2020-08-14 seedlings at different sites Quotations Envelope 11 Management involving 33 different jobs under DPO Una IN-DPO, UNA-182952-CW- RFQ / Maintenance of Component 1. Sustainable Nurseries under APO Una, Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 25,014.00 15,021.69 Signed 2020-07-12 2020-01-10 2020-09-06 2021-01-30 Thanakalan & Dehra during Quotations Envelope 05 Management 2020-21 up to 15 August, 2020. IN-DPO, UNA-184102-CW- RFQ / Construction of Component 1. Sustainable Under Vegetative Check Barriers Request for Single Stage - One 2020-12- IBRD / 90410 Land and Water Resource Post Limited 2,500.00 0.00 Implementat 2020-09-02 2020-10-15 under drainage line treatment Quotations Envelope 15 Management ion at various locations of DPO Una IN-DPO, UNA-190997-CW- RFQ / Drainage line treatment Component 1. Sustainable Request for Single Stage - One 2021-03- i/c Dry Stone check dams IBRD / 90410 Land and Water Resource Post Limited 126,200.00 67,734.70 Signed 2020-09-15 2020-10-28 2020-11-01 2020-12-10 Quotations Envelope 19 including 18 jobs/ contracts Management separately for each location. IN-DPO, UNA-184105-CW- RFQ / Spring development activities i/c Renovation of Well, springs, traditional water Component 1. Sustainable Request for Single Stage - One 2021-03- bauries, etc involving multiple IBRD / 90410 Land and Water Resource Post Limited 194,300.00 144,375.08 Signed 2020-09-20 2020-12-04 2020-11-15 2021-03-10 Quotations Envelope 25 contracts approximately 125 Management No. of jobs/contracts separately at each location in DPO Una. IN-DPO, UNA-191003-CW- RFQ / Drainage line treatment Component 1. Sustainable Pending Cement concrete check Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 9,350.00 0.00 Implementat 2020-09-20 2020-11-16 barriers approximately 10 no. Quotations Envelope 23 Management ion of multiple jobs/contracts separately at each location. Page 1 IN-DPO, UNA-195402-CW- RFQ / Grass seedling in reafforestation and Enrichment plantation areas Component 1. Sustainable Pending Request for Single Stage - One 2020-12- during 2020-21 (approx. 20 IBRD / 90410 Land and Water Resource Post Limited 12,600.00 0.00 Implementat 2020-09-26 2020-11-01 Quotations Envelope 07 Jos/ contracts) at various Management ion locations involving multiple contract i.e. separate contracts at each location. IN-DPO, UNA-195403-CW- RFQ / Grass Sowing/ Tufts along drainage line during Component 1. Sustainable Pending Request for Single Stage - One 2020-11- 2020-21. The approximate IBRD / 90410 Land and Water Resource Post Limited 17,500.00 0.00 Implementat 2020-09-24 2020-10-31 Quotations Envelope 27 number of jobs/ contracts is Management ion 10 i.e. separate contracts for each job. IN-DPO, UNA-195405-CW- RFQ / repair of existing water Component 1. Sustainable Request for Single Stage - One 2020-12- distribution system at Jankaur IBRD / 90410 Land and Water Resource Post Limited 3,400.00 3,526.24 Completed 2020-09-26 2020-10-12 2020-10-30 2020-10-26 Quotations Envelope 19 Forest nursery at Una Management involving single job/ contract. IN-DPO, UNA-200852-CW- RFQ / Management of exotic species i.e. Lantana eradication work shall be undertaken in 218 hac. area Component 1. Sustainable Request for Single Stage - One 2021-06- involving multiple jobs/ IBRD / 90410 Land and Water Resource Post Limited 73,000.00 98,568.00 Signed 2020-10-26 2020-10-28 2020-12-21 2020-12-09 Quotations Envelope 19 contracts (Approximate 20 Management No.) separately at each location keeping in view far and distant places involving local communities through IN-DPO, UNA-191847-CW- RFQ / Management of Exotic species lantana eradication in Component 1. Sustainable FY 2019-20. The No. of jobs/ Request for Single Stage - One 2020-12- IBRD / 90410 Land and Water Resource Post Limited 56,000.00 55,840.10 Signed 2020-11-17 2020-02-12 2020-12-14 2020-03-06 contracts are 21 for 192 Quotations Envelope 27 Management hectares for which separate RFQ was issued for each job/contract. IN-DPO, UNA-191849-CW- RFQ / Management of Exotic Component 1. Sustainable Request for Single Stage - One 2021-03- species i.e. 1st year IBRD / 90410 Land and Water Resource Post Limited 12,100.00 11,613.99 Signed 2020-11-23 2020-10-28 2020-12-17 2020-12-14 Quotations Envelope 16 maintenance of lantana Management treated areas during 2020-21 IN-DPO, UNA-191000-CW- RFQ / crate wire check Component 1. Sustainable barriers drainage line Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 93,000.00 52,253.20 Signed 2020-11-23 2020-11-03 2020-12-20 2020-12-14 treatment for approximate 15 Quotations Envelope 04 Management no. of Jobs/contracts separately and each location. IN-DPO, UNA-208990-CW- RFQ / Site development & Component 1. Sustainable Request for Single Stage - One 2021-01- fencing of forest nurseries at IBRD / 90410 Land and Water Resource Post Limited 17,000.00 15,877.70 Completed 2020-12-11 2020-02-13 2020-12-31 2020-03-09 Quotations Envelope 31 Chaplah, Chanour, Sapru & Management Bhatehar under DPO Una Component 1. Sustainable Under IN-DPO, UNA-208999-CW- Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 42,000.00 0.00 Implementat 2021-01-25 2021-02-17 RFQ / RCC Check dams Quotations Envelope 31 Management ion IN-DPO, UNA-208986-CW- Component 1. Sustainable RFQ / raising of nursery Request for Single Stage - One 2021-08- IBRD / 90410 Land and Water Resource Post Limited 80,000.00 94,673.98 Signed 2020-12-11 2020-10-03 2021-01-03 2021-03-03 seedling during 2020-21 up Quotations Envelope 31 Management to August 2021 IN-DPO, UNA-232946-CW- Component 1. Sustainable Request for Pending RFQ / Plantation along Request for Single Stage - One 2021-12- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 38,000.00 0.00 Implementat 2021-06-12 2021-07-10 drainage lines with grass Quotations Envelope 31 Management Bank-SPD) ion sowing/tufts during 2021-22 IN-DPO, UNA-232957-CW- Component 1. Sustainable Request for Pending RFQ / Re-afforestation 1st Request for Single Stage - One 2021-12- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 7,000.00 0.00 Implementat 2021-06-12 2021-07-10 year maintenance works of Quotations Envelope 30 Management Bank-SPD) ion plantation areas 2021-22 IN-DPO, UNA-232962-CW- Component 1. Sustainable Request for Pending RFQ / Spring Development Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 70,000.00 0.00 Implementat 2021-06-20 2021-07-30 traditional bouries/wells Quotations Envelope 20 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233205-CW- Component 1. Sustainable Request for Pending Request for Single Stage - One 2021-12- RFQ / Re-afforestation during IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 62,500.00 0.00 Implementat 2021-06-12 2021-07-10 Quotations Envelope 31 2021-22 Management Bank-SPD) ion IN-DPO, UNA-233211-CW- Component 1. Sustainable Request for Pending Request for Single Stage - One 2021-12- RFQ / Enrichment Plantations IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 39,000.00 0.00 Implementat 2021-06-12 2021-07-10 Quotations Envelope 31 during 2021-22 Management Bank-SPD) ion IN-DPO, UNA-233214-CW- Component 1. Sustainable Request for Pending RFQ / Along drainage line Request for Single Stage - One 2022-01- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 10,000.00 0.00 Implementat 2021-06-12 2021-07-10 plantation1st year Quotations Envelope 06 Management Bank-SPD) ion maintenance during 2021-22 IN-DPO, UNA-233221-CW- Component 1. Sustainable Request for Pending RFQ / Enrichment plantations Request for Single Stage - One 2022-01- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 8,000.00 0.00 Implementat 2021-06-12 2021-07-26 1st year maintenance during Quotations Envelope 22 Management Bank-SPD) ion 2021-22 IN-DPO, UNA-233223-CW- Component 1. Sustainable Request for Pending RFQ / Contour trenching and Request for Single Stage - One 2022-01- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 30,000.00 0.00 Implementat 2021-06-12 2021-07-12 grass seeding in plantation Quotations Envelope 08 Management Bank-SPD) ion areas during 2021-22 Page 2 IN-DPO, UNA-233232-CW- RFQ / Management of exotic Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- species i.e. eradication of IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 37,000.00 0.00 Implementat 2021-10-04 2021-11-08 Quotations Envelope 25 Lantana and other invasive Management Bank-SPD) ion alien species during 2021-22 IN-DPO, UNA-233235-CW- Component 1. Sustainable Request for Pending RFQ / 1st Year maintenance Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 5,000.00 0.00 Implementat 2021-10-04 2021-11-08 of Lantana infested areas Quotations Envelope 25 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233238-CW- Component 1. Sustainable Request for Pending RFQ / 2nd Year maintenance Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 5,300.00 0.00 Implementat 2021-10-04 2021-11-08 of Lantana infested areas Quotations Envelope 25 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233242-CW- Component 2. Improved Request for Pending Request for Single Stage - One 2022-03- RFQ / Ropeways and IBRD / 90410 Agricultural Productivity and Post Limited Quotations (Non 49,000.00 0.00 Implementat 2021-08-30 2021-10-15 Quotations Envelope 25 footbridges/path Value Addition Bank-SPD) ion IN-DPO, UNA-233252-GO- RFQ / Secondary water Component 2. Improved Request for Pending Request for Single Stage - One 2022-03- distribution and water use IBRD / 90410 Agricultural Productivity and Post Limited Quotations (Non 70,000.00 0.00 Implementat 2021-08-25 2021-10-06 Quotations Envelope 25 efficiency (tanks, channels, Value Addition Bank-SPD) ion sprinklers, etc.) IN-DPO, UNA-233350-CW- Component 1. Sustainable Request for Pending RFQ / Dry Stone check Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 7,000.00 0.00 Implementat 2021-08-20 2021-10-02 Barriers along drainage line Quotations Envelope 22 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233351-CW- Component 1. Sustainable Request for Pending RFQ / Crate wire check Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 40,000.00 0.00 Implementat 2021-08-20 2021-10-02 barriers along drainage line Quotations Envelope 22 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233352-CW- Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- RFQ / Cement Concrete Check IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 45,000.00 0.00 Implementat 2021-08-20 2021-10-01 Quotations Envelope 20 barriers during 2021-22 Management Bank-SPD) ion IN-DPO, UNA-233354-CW- Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-08- RFQ / Nursery seedling IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 35,000.00 0.00 Implementat 2021-09-06 2021-10-08 Quotations Envelope 15 production during 2021-22 Management Bank-SPD) ion IN-DPO, UNA-233363-CW- Component 1. Sustainable Request for Pending RFQ / Vegetative check Request for Single Stage - One 2021-08- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 3,500.00 0.00 Implementat 2021-06-21 2021-07-15 Barriers along drainage line Quotations Envelope 25 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-232970-CW- RFQ / Water harvesting structures such as Cement Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- concrete check dams, earthen IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 99,900.00 0.00 Implementat 2021-06-17 2021-08-07 Quotations Envelope 20 dams, masonry check dams, Management Bank-SPD) ion sub surface dykes, ponds , etc. during 2021-22 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-DPO, UNA-195721-GO- Component 1. Sustainable RFQ / Polythene bags Approx. Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 6,000.00 4,503.93 Completed 2020-10-01 2020-10-05 2020-11-03 2020-10-16 2020-11-19 2020-11-20 quantity 1.6 MT for raising of Quotations Envelope Management seedlings during 2020-21 IN-DPO, UNA-218485-GO- RFQ / Seeds, cultivation Component 2. Improved Request for Single Stage - One material & fertilizers for IBRD / 90410 Agricultural Productivity and Post Limited 12,000.00 12,001.56 Signed 2021-02-10 2020-10-07 2021-03-09 2021-02-16 2021-03-29 Quotations Envelope agriculture demonstration Value Addition plots IN-DPO, UNA-220767-GO- Component 1. Sustainable Request for Single Stage - One RFQ / Modern forest nursery IBRD / 90410 Land and Water Resource Post Limited 14,000.00 10,892.41 Signed 2021-03-03 2020-10-05 2021-03-25 2021-03-23 2021-03-31 Quotations Envelope equipment and seedlings Management IN-DPO, UNA-233247-GO- Component 2. Improved Pending RFQ / Pipes & pumps for Request for Single Stage - One IBRD / 90410 Agricultural Productivity and Post Limited 40,000.00 0.00 Implementati 2021-10-25 2021-12-10 2022-03-25 primary water distribution Quotations Envelope Value Addition on under component 2 IN-DPO, UNA-233254-GO- RFQ / Seeds, cultivation Component 2. Improved Pending material and technical inputs Request for Single Stage - One IBRD / 90410 Agricultural Productivity and Post Limited 18,000.00 0.00 Implementati 2021-06-20 2021-08-05 2022-03-25 for innovative practices for Quotations Envelope Value Addition on climate smart agriculture & high value crops IN-DPO, UNA-233359-GO- Component 1. Sustainable Pending RFQ / Polythene Bags for Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 7,000.00 0.00 Implementati 2021-08-06 2021-09-14 2021-10-14 Nursery seedling production Quotations Envelope Management on during 2021-22 IN-DPO, UNA-237569-GO- Component 1. Sustainable Pending Request for Single Stage - One RFQ / Wooden fence posts, IBRD / 90410 Land and Water Resource Post Limited 30,000.00 0.00 Implementati 2021-06-04 2021-06-27 2021-08-30 Quotations Envelope Barbed wire & U-staples Management on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 4 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) July 9, 2010 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other July 9, 2010 methods July 9, 2010 PROCUREMENT Western Africa : Ebola Emergency Response Project PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-04-16 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152359 GPN Date: Project Name: Ebola Emergency Response Project Loan / Credit No: IDA / D0080 Ministry of Health and Social Welfare Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-MOHSW-59304-CW-RFB / Component 1: Support to the Construction of 155 bed EVD Outbreak Response Plans Single Stage - Two 12,500,000.0 Under 2020-07- IDA / D0080 Prior Request for Bids Open - International 0.00 2018-04-30 2018-04-23 2018-07-16 2018-05-03 2018-07-16 2018-04-30 2018-05-05 2018-04-25 2018-09-24 2017-08-16 2018-12-07 2018-05-17 2019-01-11 rooms Redemption Hospital and Strengthening Essential Envelope 0 Review 04 Phase I Health Services GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 6: Post-Ebola LR-MOHSW-51567-GO-RFQ Pending Strengthening of Health Request for Single Stage - One / Procurement of Teaching IDA / D0080 Post Open - International 61,009.00 0.00 Implementati 2017-06-22 2017-08-17 2018-02-13 Systems and Epidemic Quotations Envelope equipment for AMD on Preparedness LR-MOHSW-51653-GO-DIR / Pending Component 4: Provision of Procurement of UPS Standards IDA / D0080 Post Direct Selection Direct 45,000.00 0.00 Implementati 2018-04-26 2018-05-01 2018-06-05 2018-12-02 Essential Public Services for LMHRA on Component 6: Post-Ebola Under LR-MOHSW-61507-GO-RFQ Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 40,000.00 0.00 Implementati 2018-05-07 2018-04-10 2018-07-02 2018-12-29 / Printing of CHAS Ledgers Systems and Epidemic Quotations Envelope on Preparedness LR-MOHSW-117467-GO-RFQ Component 2: Human Pending / Purchase of Assorted Resources Scale up for Request for Single Stage - One IDA / D0080 Post Limited 10,000.00 0.00 Implementati 2019-06-22 2019-08-17 2020-02-13 Laptops for use by IU, PIU, Outbreak Response and Quotations Envelope on and SCM. Essential Health Services LR-MOHSW-117468-GO-RFQ Component 2: Human Pending / Purchase of Two Buses (one Resources Scale up for Request for Single Stage - One IDA / D0080 Post Limited 130,000.00 0.00 Implementati 2019-07-03 2019-08-28 2020-02-24 30-seater and one 18-seater) Outbreak Response and Quotations Envelope on for AMD Students and Staff Essential Health Services LR-MOHSW-117904-GO-DIR Component 2: Human Pending / Purchase and Installation of Resources Scale up for IDA / D0080 Post Direct Selection Direct 10,000.00 0.00 Implementati 2019-06-26 2019-07-01 2019-08-05 2020-02-01 100 KVA Transformer for AM Outbreak Response and on Dogliotti College of Medicine Essential Health Services Component 2: Human LR-MOHSW-117907-GO-RFQ Pending Resources Scale up for Request for Single Stage - One / Purchase of Motorbike for IDA / D0080 Post Limited 9,000.00 0.00 Implementati 2019-07-03 2019-08-28 2020-02-24 Outbreak Response and Quotations Envelope use by Infrastructure Unit on Essential Health Services LR-MOHSW-153688-GO-RFQ Component 6: Post-Ebola / Purchase of Desk, Chairs, Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 6,000.00 5,925.00 Signed 2020-02-12 2020-06-04 2020-04-08 2020-06-24 2020-10-05 and Cubicle for use by the Systems and Epidemic Quotations Envelope External Aid Unit Preparedness Component 6: Post-Ebola LR-MOHSW-167181-GO-RFQ Pending Strengthening of Health Request for Single Stage - One / Purchase & Installation of IDA / D0080 Post Limited 35,000.00 0.00 Implementati 2020-05-20 2020-07-15 2021-01-11 Systems and Epidemic Quotations Envelope Internet Equipment for AMD on Preparedness LR-MOHSW-167184-GO-RFQ Component 6: Post-Ebola / Purchase of Strengthening of Health Request for Single Stage - One IDA / D0080 Post Open 197,861.00 0.00 Canceled 2020-05-21 2020-07-16 2021-01-12 Chemicals/Reagents for Systems and Epidemic Quotations Envelope LMHRA Preparedness Component 6: Post-Ebola LR-MOHSW-167178-GO-RFQ Strengthening of Health Request for Single Stage - One / Purchase of Laptop IDA / D0080 Post Limited 32,500.00 32,000.00 Completed 2020-05-22 2020-04-27 2020-07-17 2020-06-05 2021-01-13 2020-07-31 Systems and Epidemic Quotations Envelope Computers for PFMU Preparedness LR-MOHSW-181076-GO-RFQ Component 6: Post-Ebola / Purchase of Laptop Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 13,705.00 7,018.00 Completed 2020-07-25 2020-06-22 2020-09-19 2020-08-04 2021-03-18 2020-08-07 Computers for Health Systems and Epidemic Quotations Envelope Financing Unit Preparedness LR-MOHSW-189011-GO-RFB Component 6: Post-Ebola Under / Purchase of Strengthening of Health Single Stage - One IDA / D0080 Post Request for Bids Open - International 197,861.00 0.00 Implementati 2020-09-30 2020-09-09 2020-10-05 2020-09-09 2020-11-16 2020-12-16 2021-01-20 2021-07-19 Chemicals/Reagents for Systems and Epidemic Envelope on LMHRA Preparedness LR-MOHSW-189007-GO-RFQ Component 6: Post-Ebola Pending / Purchase of One (1) Piece of Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 52,000.00 0.00 Implementati 2020-10-31 2020-12-26 2021-06-24 Vehicle for use by the Health Systems and Epidemic Quotations Envelope on Financing Unit Preparedness Component 6: Post-Ebola LR-MOHSW-189008-GO-RFQ Pending Strengthening of Health Request for Single Stage - One / Printing of Health Financing IDA / D0080 Post Limited 37,500.00 0.00 Implementati 2020-10-24 2020-12-19 2021-06-17 Systems and Epidemic Quotations Envelope Unit RDF Operational Manual on Preparedness LR-MOHSW-211825-GO-DIR Component 1: Support to the / Purchase of Dialysis Kit EVD Outbreak Response Plans IDA / D0080 Prior Direct Selection Direct 377,400.00 0.00 Canceled 2021-03-16 2021-01-13 2021-03-21 2021-04-25 2021-10-22 Consumables, and and Strengthening Essential Maintenance Services Health Services Page 1 LR-MOHSW-200495-GO-RFQ Component 2: Human / Purchase of Laptop Pending Resources Scale up for Request for Single Stage - One Computer, Camera, External IDA / D0080 Post Limited 4,250.00 0.00 Implementati 2020-11-07 2021-01-02 2021-07-01 Outbreak Response and Quotations Envelope Hard Drive, and Drone for use on Essential Health Services by the Infrastructure Unit Component 1: Support to the LR-MOHSW-231653-GO-RFQ Pending EVD Outbreak Response Plans Request for Single Stage - One / Procurement of Additional IDA / D0080 Post Limited 13,500.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 and Strengthening Essential Quotations Envelope Three (3) Motorbikes on Health Services Component 1: Support to the LR-MOHSW-231656-GO-DIR Under EVD Outbreak Response Plans / Purchase of Dialysis Kit, and IDA / D0080 Post Direct Selection Direct 377,400.00 0.00 Implementati 2021-03-16 2021-01-11 2021-03-21 2021-04-25 2021-10-22 and Strengthening Essential Maintenance Services on Health Services LR-MOHSW-237601-GO-RFQ Component 1: Support to the Pending / Purchase of Assorted Drugs EVD Outbreak Response Plans Request for Single Stage - One IDA / D0080 Post Open - International 50,000.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 and Supplies for Dialysis and Strengthening Essential Quotations Envelope on Machine Usage Health Services NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-75982-NC-RFQ Component 6: Post-Ebola / Printing of Health Sector Strengthening of Health Request for Single Stage - One IDA / D0080 Post Limited 15,000.00 13,000.00 Completed 2018-09-08 2018-09-12 2018-11-03 2018-12-12 2019-05-02 2018-11-16 Report for Health Financing Systems and Epidemic Quotations Envelope Unit Preparedness Component 6: Post-Ebola LR-MOHSW-167172-NC-RFQ Pending Strengthening of Health Request for Single Stage - One / Provision of Internet IDA / D0080 Post Limited 15,000.00 0.00 Implementati 2020-05-20 2020-07-15 2021-01-11 Systems and Epidemic Quotations Envelope Services to AMD on Preparedness LR-MOHSW-237630-NC-RFP / Hiring of Security Firm for Component 1: Support to the Pending the Provision of Security EVD Outbreak Response Plans Request for Single Stage - One IDA / D0080 Post Limited 21,600.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2022-04-18 Services at the New and Strengthening Essential Proposals Envelope on Redemption Hospital Health Services Construction Site CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-167159-NC-RFP Component 6: Post-Ebola / Hiring of Design Strengthening of Health Least Cost Pending IDA / D0080 Post Open - International 500,000.00 0.00 2020-05-17 2020-06-07 2020-07-21 2020-08-18 2020-09-17 2020-10-22 2020-11-26 2021-05-25 Consultant_Redemtion Phase- Systems and Epidemic Selection Implementation 2 Designs Preparedness INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-51658-CS-INDV Individual / Recruitment of Impact Component 4: Provision of Pending IDA / D0080 Post Consultant Open 108,000.00 0.00 2017-07-12 2017-08-30 2017-09-20 2017-10-25 2018-04-23 Evaluator (HMER) Health Work Essential Public Services Implementation Selection Force Program LR-MOHSW-59322-CS-INDV Component 2: Human Individual / Recruitment of Research Resources Scale up for Pending IDA / D0080 Post Consultant Open 20,400.00 0.00 2018-07-25 2018-09-12 2018-10-03 2018-11-07 2019-05-06 Manager (Health Workforce Outbreak Response and Implementation Selection Program)HMER Essential Health Services LR-MOHSW-59324-CS-INDV Component 2: Human / Recruitment of Health Individual Resources Scale up for Pending Management Information IDA / D0080 Post Consultant Open 8,400.00 0.00 2018-07-31 2018-09-18 2018-10-09 2018-11-13 2019-05-12 Outbreak Response and Implementation System Officer (Health Selection Essential Health Services Workforce Program)HMER LR-MOHSW-59326-CS-INDV Component 2: Human / Recruitment of Health Individual Resources Scale up for Pending Management Information IDA / D0080 Post Consultant Open 8,400.00 0.00 2018-06-28 2018-08-16 2018-09-06 2018-10-11 2019-04-09 Outbreak Response and Implementation System Officer (Health Selection Essential Health Services Workforce Program)HMER LR-MOHSW-59319-CS-INDV Component 2: Human Individual / Recruitment of Human Resources Scale up for Pending IDA / D0080 Post Consultant Open 8,400.00 0.00 2018-07-25 2018-09-12 2018-10-03 2018-11-07 2019-05-06 Resource Inforation Officer Outbreak Response and Implementation Selection (HMER) Essential Health Services MOH-REF-12 / Recruit TA to Component 2: Human Individual develop standards for Resources Scale up for Pending IDA / D0080 Post Consultant Open 62,200.00 0.00 2018-06-28 2018-08-16 2018-09-06 2018-10-11 2019-04-09 Physicians and Physician Outbreak Response and Implementation Selection Assistant for LMDC Essential Health Services LR-MOHSW-59321-CS-INDV Component 2: Human Individual / Recruit TA to develop Resources Scale up for Pending IDA / D0080 Post Consultant Open 19,500.00 0.00 2018-07-25 2018-09-12 2018-10-03 2018-11-07 2019-05-06 internship programs and Outbreak Response and Implementation Selection systems guidelines for LMDC Essential Health Services Component 2: Human LR-MOHSW-59327-CS-INDV Individual Resources Scale up for Pending / Recruitment of Internship IDA / D0080 Post Consultant Open 25,350.00 0.00 2017-07-28 2017-09-15 2017-10-06 2017-11-10 2018-05-09 Outbreak Response and Implementation Progrram Director for LMDC Selection Essential Health Services Component 2: Human Individual MOH-REF-20 / Recruitment Resources Scale up for Pending IDA / D0080 Post Consultant Open 56,000.00 0.00 2018-02-28 2018-04-18 2018-05-09 2018-06-13 2018-12-10 of Associate Dean for AMD Outbreak Response and Implementation Selection Essential Health Services Page 2 Component 2: Human LR-MOHSW-59325-CS-INDV Individual Resources Scale up for Under / Recruitment of Regional HR IDA / D0080 Post Consultant Open 46,800.00 0.00 2018-07-31 2018-05-02 2018-09-18 2018-10-09 2018-11-13 2019-05-12 Outbreak Response and Implementation Officers (4) Selection Essential Health Services Component 2: Human LR-MOHSW-59318-CS-INDV Individual Resources Scale up for Under / Recruitment of Payroll IDA / D0080 Post Consultant Open 11,250.00 0.00 2018-06-28 2018-05-02 2018-08-16 2018-09-06 2018-10-11 2019-04-09 Outbreak Response and Implementation Officers Selection Essential Health Services Component 1: Support to the Individual MOH-REF-22 / Recruitment EVD Outbreak Response Plans Pending IDA / D0080 Post Consultant Open 15,300.00 0.00 2017-12-16 2018-02-03 2018-02-24 2018-03-31 2019-03-26 of HR Planning Officer and Strengthening Essential Implementation Selection Health Services LR-MOHSW-99577-CS-CDS / Component 1: Support to the Consultancy for Equipment EVD Outbreak Response Plans Under Assessment & The IDA / D0080 Post Direct Selection Direct 49,280.00 0.00 2019-02-18 2019-02-06 2019-02-28 2019-05-04 2019-10-31 and Strengthening Essential Implementation Development of Specifications Health Services for New Redemption Hospital. LR-MOHSW-106729-CS-CDS / Hiring of Consultant to Component 1: Support to the Provide Outstanding Design EVD Outbreak Response Plans Under and Supervision Consultant IDA / D0080 Post Direct Selection Direct 490,000.00 0.00 2019-04-05 2019-03-26 2019-04-15 2019-06-19 2019-12-16 and Strengthening Essential Implementation Services for the New Health Services Redemption Hospital Phase-1 Project Component 2: Human LR-MOHSW-117462-CS-CDS Resources Scale up for Under / Recruitment of Pediatric IDA / D0080 Post Direct Selection Direct 36,882.00 0.00 2019-06-01 2016-05-16 2019-06-11 2019-06-06 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-1 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117464-CS-CDS Resources Scale up for Under / Recruitment of Pediatric IDA / D0080 Post Direct Selection Direct 25,382.00 0.00 2019-06-01 2016-05-16 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-2 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117461-CS-CDS Resources Scale up for Pending / Recruitment of OB/GYN IDA / D0080 Post Direct Selection Direct 16,921.00 0.00 2019-06-01 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-1 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117463-CS-CDS Resources Scale up for Pending / Recruitment of OB/GYN IDA / D0080 Post Direct Selection Direct 16,921.00 0.00 2019-06-01 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-2 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117466-CS-CDS Resources Scale up for Pending / Recruitment of Surgical IDA / D0080 Post Direct Selection Direct 16,921.00 0.00 2019-06-01 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-1 for LCPS Essential Health Services Component 2: Human LR-MOHSW-117465-CS-CDS Resources Scale up for Pending / Recruitment of Surgical IDA / D0080 Post Direct Selection Direct 16,921.00 0.00 2019-06-01 2019-06-11 2019-08-15 2020-02-11 Outbreak Response and Implementation Consultant-2 for LCPS Essential Health Services LR-MOHSW-147196-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 120,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-08-01 2019-11-15 2020-05-13 Specialist Faculty in Outbreak Response and Implementation Surgery_EDEIK Essential Health Services LR-MOHSW-147202-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 84,000.00 0.00 2019-10-01 2019-11-19 2019-10-11 2019-08-08 2019-12-15 2020-06-12 Specialist Faculty in Outbreak Response and Implementation Surgery_MUSHAM Essential Health Services LR-MOHSW-147212-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 120,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-08 2019-11-15 2020-05-13 Specialist Faculty Chair in Outbreak Response and Implementation Pediatrics_FINJO Essential Health Services LR-MOHSW-147213-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 84,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-08 2019-11-15 2020-05-13 Specialist Faculty in Outbreak Response and Implementation Pediatrics_READI Essential Health Services LR-MOHSW-147200-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 84,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-08 2019-11-15 2020-05-13 Specialist Faculty in Outbreak Response and Implementation Pediatrics_MAGDA Essential Health Services LR-MOHSW-147204-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 84,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-08-08 2019-11-06 2020-05-04 Specialist Faculty in Obstetrics Outbreak Response and Implementation and Gynecology_WODUV Essential Health Services LR-MOHSW-147201-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 120,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-10 2019-11-15 2020-05-13 Specialist Faculty in Obstetrics Outbreak Response and Implementation and Gynecology_ETEGHA Essential Health Services LR-MOHSW-147215-CS- Component 2: Human INDV / Recruitment of Resources Scale up for Under IDA / D0080 Post Direct Selection Direct 120,000.00 0.00 2019-09-01 2019-11-19 2019-09-11 2019-07-10 2019-11-15 2020-05-13 Specialist Faculty Chair in Outbreak Response and Implementation Internal Medicine_SUNCHI Essential Health Services LR-MOHSW-167182-CS- Component 6: Post-Ebola Individual INDV / Hiring of an Strengthening of Health Pending IDA / D0080 Post Consultant Open 256,752.00 0.00 2020-05-17 2020-07-05 2020-07-26 2020-08-30 2021-02-26 International Procurement Systems and Epidemic Implementation Selection Consultant for IFISH Preparedness Component 2: Human LR-MOHSW-201921-CS- Individual Resources Scale up for Pending INDV / Hiring of Project IDA / D0080 Post Consultant Direct 78,000.00 0.00 2020-03-31 2020-04-10 2020-05-01 2020-06-05 2022-03-31 Outbreak Response and Implementation Manager_MTKF_PIU_MOH Selection Essential Health Services Page 3 LR-MOHSW-201926-CS- Component 2: Human Individual INDV / Hiring of Assistant Resources Scale up for Pending IDA / D0080 Post Consultant Direct 82,353.06 0.00 2020-10-01 2020-10-11 2020-11-01 2020-12-06 2022-03-31 Project Outbreak Response and Implementation Selection Manager_PIU_MOH_HFN Essential Health Services Component 2: Human LR-MOHSW-201923-CS- Individual Resources Scale up for Pending INDV / Hiring of Procurement IDA / D0080 Post Consultant Direct 52,941.24 0.00 2020-10-01 2020-10-11 2020-11-01 2020-12-06 2022-03-31 Outbreak Response and Implementation Officer_PIU_MOH_MAS Selection Essential Health Services LR-MOHSW-201922-CS- Component 2: Human Individual INDV / Hiring of Resources Scale up for Pending IDA / D0080 Post Consultant Direct 50,000.04 0.00 2020-10-01 2020-10-11 2020-11-01 2020-12-06 2022-03-31 Administrative & Finance Outbreak Response and Implementation Selection Officer_EJSK Essential Health Services LR-MOHSW-237608-CS- Component 2: Human Individual INDV / Contract Addendum Resources Scale up for Under IDA / D0080 Post Consultant Direct 70,450.00 0.00 2021-06-06 2021-06-02 2021-06-16 2021-07-07 2021-08-11 2022-02-07 for the Hiring of Anatomy Outbreak Response and Implementation Selection Faculty for the AMD_ANAT Essential Health Services LR-MOHSW-237611-CS- Component 2: Human Individual INDV / Contract Addendum Resources Scale up for Under IDA / D0080 Post Consultant Direct 70,450.00 0.00 2021-06-07 2021-06-02 2021-06-17 2021-07-08 2021-08-12 2022-02-08 for the Hiring of Biochemistry Outbreak Response and Implementation Selection Faculty for the AMD_BIOCH Essential Health Services LR-MOHSW-237614-CS- Component 2: Human Individual INDV / Contract Addendum Resources Scale up for Under IDA / D0080 Post Consultant Direct 70,450.00 0.00 2021-06-07 2021-06-02 2021-06-17 2021-07-08 2021-08-12 2022-02-08 for the Hiring of Physiology Outbreak Response and Implementation Selection Faculty_AMD_PHYSIO Essential Health Services LR-MOHSW-237619-CS- Component 2: Human Individual INDV / Contract Addendum Resources Scale up for Under IDA / D0080 Post Consultant Direct 70,450.00 0.00 2021-06-07 2021-06-02 2021-06-17 2021-07-08 2021-08-12 2022-02-08 for the Hiring of Histology Outbreak Response and Implementation Selection Faculty for the AMD_HIST Essential Health Services LR-MOHSW-237621-CS- INDV / Hiring of Chair Component 2: Human OB/GYN Faculty /Consultant Individual Resources Scale up for Pending for LCPS IDA / D0080 Post Consultant Direct 78,550.00 0.00 2021-06-14 2021-06-24 2021-07-15 2021-08-19 2022-02-15 Outbreak Response and Implementation Contract Addendum for the Selection Essential Health Services Hiring of Chair OB/GYN Faculty for the LCPS__OB/GYN LR-MOHSW-237626-CS- INDV / Hiring of OB/GYN Component 2: Human Individual Faculty /Consultant for LCPS Resources Scale up for Pending IDA / D0080 Post Consultant Direct 65,050.00 0.00 2021-06-13 2021-06-23 2021-07-14 2021-08-18 2022-02-14 Contract Addendum for the Outbreak Response and Implementation Selection Hiring of OB/GYN Faculty for Essential Health Services the LCPS Component 2: Human LR-MOHSW-237628-CS- Individual Resources Scale up for Pending INDV / Hiring of Pediatrics IDA / D0080 Post Consultant Direct 65,050.00 0.00 2021-06-13 2021-06-23 2021-07-14 2021-08-18 2022-02-14 Outbreak Response and Implementation Faculty/Consultant for LCPS Selection Essential Health Services Page 4 PROCUREMENT PLAN (Textual Part) Project information: Senegal Casamance Economic Development ProjectP175325 Project Implementation agency: Project Implementation Unit Pole de Développement de la Casamance ( PPDC)under Ministry of Territorial Collectivity, Management and Development Date of the Procurement Plan: April 18th, 2021 Period covered by this Procurement Plan: April 30th 2021 – October 30 th 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” All goods, non-consulting services and consulting services required for the Activities and to be financed out of the proceeds of the Advance shall be procured in accordance with the requirements set forth or referred to in the “World Bank Procurement Regulations for IPF Borrowers” dated on July 2016 and updated on August 2018 and November 2020 (“Procurement Regulations”) and the provisions of the Recipient’s procurement plan for the Activities dated November 15, 2020 (“Procurement Plan”) provided for under Section IV of the Procurement Regulations, as the same may be updated from time to time in agreement with the World Bank. In addition, the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Decree # 2014-1212 dated September 22, 2014, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. . When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable”. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: “Not Applicable”. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): “Not Applicable”. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable: “Not Applicable” . Other Relevant Procurement Information: “Not Applicable”. PROCUREMENT Senegal : Casamance Economic Development Project PLAN General Information Country: Senegal Bank’s Approval Date of the Original Procurement Plan: 2021-05-31 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175325 GPN Date: Project Name: Casamance Economic Development Project Loan / Credit No: IDA / V3670 Casamance Economic Development Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SN-PDEC-237672-CW-RFQ / Sélection d'entreprise pour la Empowering communities Request for Pending réalisation des travaux de Request for Single Stage - One 2022-05- IDA / V3670 and local institutions to build Post Limited Quotations (Non 140,000.00 0.00 Implementat 2021-09-27 2021-11-22 sous-projets d'engagement Quotations Envelope 21 social cohesion Bank-SPD) ion citoyen dans la commune de Diaroumé SN-PDEC-237666-CW-RFQ / Broadening sustainable Sélection d'entreprise pour Request for Pending livelihoods opportunities for Request for Single Stage - One 2022-05- aménager des pépinières, IDA / V3670 Post Limited Quotations (Non 100,000.00 0.00 Implementat 2021-09-15 2021-11-10 greater social and economic Quotations Envelope 09 abris et bureaux dans les Bank-SPD) ion inclusion fermes horticoles SN-PDEC-237667-CW-RFQ / Sélection d'entreprises pour la Empowering communities Request for Pending réalisation des travaux de Request for Single Stage - One 2022-05- IDA / V3670 and local institutions to build Post Limited Quotations (Non 140,000.00 0.00 Implementat 2021-09-20 2021-11-15 sous-projets d'engagement Quotations Envelope 14 social cohesion Bank-SPD) ion citoyen dans la commune de Diégoune SN-PDEC-237671-CW-RFQ / Sélection d'entreprise pour la Empowering communities Request for Pending réalisation des travaux de Request for Single Stage - One 2022-05- IDA / V3670 and local institutions to build Post Limited Quotations (Non 140,000.00 0.00 Implementat 2021-09-20 2021-11-15 sous-projets d'engagement Quotations Envelope 14 social cohesion Bank-SPD) ion citoyen dans la commune de Pakour GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending SN-PDEC-237663-GO-RFQ / Request for Single Stage - One IDA / V3670 Project Management Post Limited 18,200.00 0.00 Implementati 2021-09-04 2021-10-30 2021-12-29 Acquisition TOMPRO s/web Quotations Envelope on SN-PDEC-237664-GO-RFQ / Pending Request for Single Stage - One Acquisition du Logiciel de IDA / V3670 Project Management Post Limited 2,000.00 0.00 Implementati 2021-09-04 2021-10-30 2022-01-28 Quotations Envelope Planification MS PROJECT on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SN-PDEC-237204-NC-RFQ / Pending Sélection d'une entreprise Request for Single Stage - One IDA / V3670 Project Management Post Limited 4,800.00 0.00 Implementati 2021-07-05 2021-08-30 2022-08-30 chargée du nettoyage des Quotations Envelope on locaux du projet SN-PDEC-237665-NC-RFQ / Pending Sélection d'une entreprise Request for Single Stage - One IDA / V3670 Project Management Post Limited 4,800.00 0.00 Implementati 2021-08-02 2021-09-27 2022-09-27 chargée du gardiennage des Quotations Envelope on locaux du projet CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SN-PDEC-237142-CS-QCBS / Recrutement du bureau d'études et de contrôle des Quality And Cost- Pending IDA / V3670 Project Management Post Open - National 240,000.00 0.00 2021-08-11 2021-09-01 2021-10-15 2021-11-12 2021-12-12 2022-01-16 2022-02-20 2023-02-20 pistes de désenclavement Based Selection Implementation dans les régions de Sédhiou et Kolda SN-PDEC-237023-CS-CQS / Consultant Sélection de firme pour le Under IDA / V3670 Project Management Post Qualification Limited 48,000.00 0.00 2021-05-31 2021-06-05 2021-06-05 2021-07-05 2021-08-09 2021-10-08 recrutement du personnel clé Implementation Selection du Projet SN-PDEC-237658-CS-CQS / Sélection d'un Consultant pour la préparation des instruments de sauvegarde environnementale et sociale : Consultant Pending CGES, PCR,PGPP,Plan IDA / V3670 Project Management Post Qualification Limited 160,000.00 0.00 2021-09-29 2021-10-13 2021-11-12 2021-12-17 2022-02-15 Implementation d'Engagement Selection Environnemental et Social (PEES), Plan de Mobilisation des Parties Prenantes (PMPP), etc. INDIVIDUAL CONSULTANTS Page 1 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SN-PDEC-237049-CS-INDV / Sélection d'un consultant pour réaliser les études Individual Pending d'identification et de IDA / V3670 Project Management Post Consultant Limited 36,000.00 0.00 2021-06-10 2021-06-15 2021-07-06 2021-08-10 2021-09-15 Implementation priorisation des communes Selection bénéficiaires dans les 3 régions de la Casamance SN-PDEC-237060-CS-INDV / Sélection d'un Consultant pour l'assistance technique de la Chambre de Commerce Individual Pending d'Industrie et d'Agriculture de IDA / V3670 Project Management Post Consultant Limited 24,000.00 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2021-10-14 Implementation Ziguinchor (CCIAZ) pour le Selection suivi de la concession de la Plateforme Economique Intégrée de Bignona (PEIB) SN-PDEC-237065-CS-INDV / Sélection de consultants chargé des études, du suivi et Individual du contrôle de la réalisation Pending IDA / V3670 Project Management Post Consultant Limited 24,000.00 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2022-02-11 de sous-projets Implementation Selection d'engagement citoyen dans les communes de Diégoune, Diaroumé et de Pakour SN-PDEC-237067-CS-INDV / Sélection d'un consultant pour une mission d'assistance technique aux Individual Pending coopérateurs/coopératrices IDA / V3670 Project Management Post Consultant Limited 12,000.00 0.00 2021-06-17 2021-06-22 2021-07-13 2021-08-17 2022-02-13 Implementation pour l'exploitation, la gestion Selection et la mise en marché des produits horticoles y compris des visites d'échanges SN-PDEC-237070-CS-INDV / Sélection d'un consultant chargé d'élaborer un schéma Individual Pending de Suivi-évaluation intégrant IDA / V3670 Project Management Post Consultant Limited 48,000.00 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2022-02-11 Implementation les parties prenantes et Selection utilisant des indicateurs sociaux SN-PDEC-237074-CS-INDV / Sélection d'un Consultant Individual Pending pour l'étude des aspirations IDA / V3670 Project Management Post Consultant Limited 30,000.00 0.00 2021-06-24 2021-06-29 2021-07-20 2021-08-24 2021-10-23 Implementation socio-économiques des Selection jeunes et des femmes SN-PDEC-237076-CS-INDV / Sélection d'un consultant pour Individual l'étude des mécanismes Pending IDA / V3670 Project Management Post Consultant Limited 30,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2021-11-18 d'adaptation des populations Implementation Selection au changement climatique en Casamance SN-PDEC-237135-CS-INDV / Sélection d'un Consultant Individual Pending pour l'élaboration d'un IDA / V3670 Project Management Post Consultant Limited 48,000.00 0.00 2021-07-30 2021-08-04 2021-08-25 2021-09-29 2021-11-28 Implementation manuel de procédures Selection techniques, comptables et financières SN-PDEC-237136-CS-INDV / Individual Recrutement Spécialiste NTIC Pending IDA / V3670 Project Management Post Consultant Limited 5,600.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 pour accompagner la Implementation Selection préparation du Projet SN-PDEC-234858-CS-CDS / Sélection directe du Under Coordinateur du Projet de IDA / V3670 Project Management Post Direct Selection Direct 63,500.00 0.00 2021-06-11 2021-06-05 2021-07-01 2021-06-08 2021-07-24 2022-07-24 Implementation Developpement Economique de la Casamance (PDEC) SN-PDEC-237397-CS-INDV / Individual Pending Recrutement de l'expert en IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 2021-07-28 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Implementation communication du projet Selection SN-PDEC-237399-CS-INDV / Individual Recrutement d'un spécialiste IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 Under Review 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 en financement des projets Selection SN-PDEC-237578-CS-INDV / Recrutement d'un Consultant Individual Under en infrastructures pour IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Implementation appuyer la formulation du Selection Projet SN-PDEC-237581-CS-INDV / Individual Sélection du comptable du IDA / V3670 Project Management Post Consultant Open 24,000.00 0.00 Under Review 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 projet Selection SN-PDEC-237673-CS-INDV / Individual Recrutement d'un consultant IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 Under Review 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Responsable Administratif et Selection Financier du Projet SN-PDEC-237674-CS-INDV / Individual Under Recrutement d'un spécialiste IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Implementation en développement rural Selection SN-PDEC-237660-CS-INDV / Recrutement d'un Consultant Individual en sauvegarde IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 Under Review 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 environnementale et sociale Selection pour appuyer la formulation du Projet Page 2 SN-PDEC-237662-CS-INDV / Sélection du Consultant pour les études d'identification et de priorisation des pistes Individual nécessitant des traitements de Pending IDA / V3670 Project Management Post Consultant Limited 48,000.00 0.00 2021-08-31 2021-09-05 2021-09-26 2021-10-31 2021-12-15 points critiques pour Implementation Selection améliorer l'accessibilité rurale en Casamance avec les élus, administrations, opérateurs économiques, populations SN-PDEC-237661-CS-INDV / Individual Recrutement du Consultant Under IDA / V3670 Project Management Post Consultant Open 30,000.00 0.00 2021-07-28 2021-06-15 2021-09-15 2021-10-06 2021-11-10 2022-11-10 Spécialiste en Passation des Implementation Selection Marchés SN-PDEC-239887-CS-INDV / Individual Sélection d'un consultant Pending IDA / V3670 Project Management Post Consultant Open 45,000.00 0.00 2021-06-23 2021-08-11 2021-08-21 2021-09-25 2022-09-25 chargé du Suivi - Evaluation Implementation Selection du Projet SN-PDEC-239894-CS-INDV / Individual Sélection du consultant Pending IDA / V3670 Project Management Post Consultant Open 45,000.00 0.00 2021-06-23 2021-08-11 2021-09-01 2021-10-06 2022-10-06 chargé du Développement Implementation Selection Social et Genre SN-PDEC-239899-CS-INDV / Sélection du consultant Individual Pending chargé de préparer les états IDA / V3670 Project Management Post Consultant Limited 5,000.00 0.00 2021-06-23 2021-06-28 2021-07-19 2021-08-23 2021-09-22 Implementation financiers en vue de l'audit du Selection ppdc Page 3 PROCUREMENT PLAN (Textual Part) Project information: OECS Regional Health Project P168539 , Commonwealth of Dominica, Grenada, Saint Lucia, Saint Vincent, Caribbean Public Health Agency (CARPHA) and the OECS Commission Project Implementation agencies: MoH StL, MoH SVG, MoH Grenada, MoH Domonica, CARPHA & OECS Commission Date of the Procurement Plan: [01-24-2020] Period covered by this Procurement Plan: 01/24/2020-01-24/2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Other Relevant Procurement Information. 1. Procurement Plan for the Project- St. Lucia Type of Contract Ref. Selection Me Contract Signing . Activity Description Procurem Completion Date No. thod Date (Planned) ent (Planned) Establish National Standards for the implementation and use of an independent 1 1.01 quality control mechanism Consultant CQS 15 Feb 2020 15 Aug 2020 for physical infrastructure and internal finishing of health facilities. Type of Contract Ref. Selection Me Contract Signing . Activity Description Procurem Completion Date No. thod Date (Planned) ent (Planned) SMART Health Facilities 2 Works RFB (National) 15 Jan 2020 15 Jan 2023 1.02 Retrofitting a. Design and Supervision Consultant CQS 15 Jan 2020 15 Jan 2023 RFQ 3 Laboratory Infrastructure Goods/ICT 15 Mar 2020 15 Jun 2020 (International) 1.03 Capacity Building (Food Consultant CQS 15 Mar 2020 15 Jun 2020 Safety) 9 1.08 Specimen Transportation Goods/ICT RFQ (National) 15 Jul 2021 15 Dec 2022 10 2.1 Lab Data Management Tool Goods/ICT RFQ (National) 15 Apr 2020 15 Jun 2021 4 Medical Technologists 11 2.2 Training NA TBD TBD (Training Skills) 2 Pathologists (Training 12 3 Training NA TBD TBD Skills) 2 Histotechnologists 13 3 Training NA TBD TBD (Training Skills) 14 3 Lab Disaster Management Training NA TBD TBD Training for Capacity Type of Contract Ref. Selection Me Contract Signing . Activity Description Procurem Completion Date No. thod Date (Planned) ent (Planned) Building/skills for laboratory staff RFQ 17 2.03 Food safety equipment Goods/ICT 15 Apr 2020 15 Jun 2021 (International) Health and Safety RFQ 18 2.04 improvement in the Goods/ICT 15 Apr 2020 15 Jun 2021 (International) workplace (equipment) Vector Control Programme – Capacity Building for Vector Control Officers in Vector Consultant CQS 15 Jun 2021 15 Jul 2022 Management and Surveillance Capacity Building for 19 2.05 Community Groups and Local Consultant CQS Government Procurement of Essential equipment to support and RFQ implement the vector control Goods/ICT 15 Aug 2020 15 Dec 2021 (International) programme (Entomology Laboratory) Type of Contract Ref. Selection Me Contract Signing . Activity Description Procurem Completion Date No. thod Date (Planned) ent (Planned) 2.08 Capacity building at Ports of Consultant CQS 15 Jun 2021 15 Jul 2022 a Entry – Training 22 2.08 Capacity Building at Ports of Goods/ICT RFQ (National) 15 Aug 2020 15 Dec 2021 b Entry – Equipment Finalization and Implementation of the 2.09 national health disaster Consultant CQS 15 Jan 2021 15 Jun 2022 a management plan – Consultancy on Comm. 23 Finalization and implementation of the 2.10 national health disaster Goods/ICT RFQ (National) 15 Mar 2021 15 Jun 2022 b management plan – Equipment 25 2.11 Hearse Goods/ICT RFQ (National) 15 Feb 2020 15Apr 2021 Caribbean Field Epidemiology RFQ (National) and Laboratory Training 15 Feb 2022 Goods/ICT 15 Feb 2020 Programme (Cr-FELTP) Frontline Training Caribbean Field Epidemiology Goods/ICT RFQ (National) 15 Feb 2020 15 Feb 2022 and Laboratory Training Type of Contract Ref. Selection Me Contract Signing . Activity Description Procurem Completion Date No. thod Date (Planned) ent (Planned) Programme (Cr-FELTP) Level 1 Training Project Management 26 3.01 Operational Expensed NA NA Total project cost 2. Procurement Plan for the Project- OECS Commission Re Type of Contract Contract f. Selection Me No Activity Description Procurem Signing Date Completion Date No thod ent (Planned) (Planned) . Consultancy for Health Facilities Inventory- Inventory of All Emergency/ Urgent Care Facilities in Consultant 1.1 CQS 22-Feb-20 18-Nov-20 four Countries and Emergency and Services Critical Care Services- Procurement of Software for 1.2 Database of Inventory and for GIS Goods RFQ 8-Feb-20 08-May-20 Mapping Lab Transport System Assessment and Action Plan for implementation of Consultant 1.3 IC 16-Oct-19 12-Apr20 agreements, policy and legislation Services (PPA Activity) Development and Implementation of Lab transportation Agreements and Consultant 1.4 QCBS 13-Nov-20 8-Nov-21 Policies Services OECS Pharmaceutical Facility - Support for Existing Software Direct 1.5 Goods 8-Feb-20 08-May-20 Development Selection Re Type of Contract Contract f. Selection Me No Activity Description Procurem Signing Date Completion Date No thod ent (Planned) (Planned) . Initiative for implementation of policy Consultant Direct 1.7 10-Mar-20 5-Mar-21 and legislation - CMLF Services Selection Development of Resource budgets and plans for Countries to meet LQMS Consultant Direct 1.8 7-Oct-19 5-Jan-20 Tier 1 and Tier 2 Requirements – Services Selection CMLF (PPA Activity) Development of relevant Policies and Legislation to facilitate the OECS Consultant 2.1 CQS 26-May-20 21-May-21 Unique ID Services Regional Public Education Campaign Risk Assessment and Action Plan for Implementation of OECS Unique ID Consultant 2.2 CQS 26-Oct-19 24-Jan-20 linked to a Unique Health Identifier Services (PPA Activity) Complete Risk Assessment and Develop and Action Plan for OECS Consultant 2.3 CQS 28-Mar-21 26-Jul-21 Health Emergency Services Services Coordinating Mechanism Prepositioned contract development Consultant 2.4 CQS 26-Jan-20 24-Jun-20 assignment Services Re Type of Contract Contract f. Selection Me No Activity Description Procurem Signing Date Completion Date No thod ent (Planned) (Planned) . Procurement of software to manage 2.5 Goods RFB 15-Mar-20 05-Nov-20 pre-positioned contracts Consultancy for Assessment of Registration Process and Requirement Consultant 2.6 ICS 1-Apr-20 30-Jun-20 for Software to Facilitate Services Harmonisation Web-based platform for registration 2.7 of Health Professional (Consultancy to Goods RFB 12-Oct-20 9-Feb-21 undertake assessment $48,000) Training 2.8 Training NA Meeting for harmonization of 2.9 Registration Requirements for Health Workshop NA professional PIU Staff (Project Manager, IC / Direct Procurement Officer, Accountant, Consultant Selection 3.1 1-Nov-19 30-Oct-22 Project Assistant) Services Multiple 3.2 Procurement of Office Equipment Goods RFQ 8-Sep-19 6-Jan-20 Re Type of Contract Contract f. Selection Me No Activity Description Procurem Signing Date Completion Date No thod ent (Planned) (Planned) . 3.3 Procurement of Office Furniture Goods RFQ 8-Sep-19 6-Jan-20 Procurement of Office Supplies 3.4 Goods RFQ 8-Sep-19 6-Jan-20 Retrofitting of existing office building 3.5 Works RFQ 8-Sep-19 7-Dec-19 Procurement of Audit Firm to Consultant 3.6 undertake Project Audit LCS 20-Nov-20 4-Jan-21 Services Operating Expenses 3.7 NA NA NA NA Total 3. Procurement Plan for the Project- Dominica No Re Activity Description Type of Selection Contract Contract Completion Date . f. Procure Signing Date (Planned) Method No ment (Planned) . 1 Upgrade works for 3 health centres - Castle Bruce (800k) + St Joseph ($700k) + Wesley ($500k): -Extension of physical structure & construction of additional rooms (Wesley only) Design/supervision Consulta CQS 15-Dec-19 30-Apr-22 ncy Works Works RFB 15-Apr-20 15-Apr-21 (National) Furniture/equipment Goods RFQ 15-Mar-21 15-Apr-21 (National) 2 Community outreach, printed Goods RFQ TBD TBD material, rental of PA System, etc. (National) 3 Biomedical Waste Management; Goods RFQ TBD TBD improvement for resiliency: (Internatio nal) Purchase of waste management vehicle to transport biomedical waste No Re Activity Description Type of Selection Contract Contract Completion Date . f. Procure Signing Date (Planned) Method No ment (Planned) . 4 Biomedical Waste Management; Goods RFQ TBD TBD improvement for resiliency: (National) Improve Storage of Biomedical Waste at sites including purchase refrigerators 5 Biomedical Waste Management; Training TBD improvement for resiliency: Training of medical staff to handle biomedical waste management 6 Upgrade laboratory facility and Goods RFQ TBD TBD capacity by equipping district (National) hospital lab in Portsmouth, Marigot, La Plaine & Grand Bay Expand testing and support with diagnostic capacity (procurement of Purchase analyzers to include handheld systems e.g. i-stat 7 Strengthen laboratory data Goods/IC RFQ TBD TBD management system – Supply and T (National) Installation of additional components of existing Lab Information System (Schuylab); Schuylab Remote Printing, Schuylab web base No Re Activity Description Type of Selection Contract Contract Completion Date . f. Procure Signing Date (Planned) Method No ment (Planned) . 8 Ensure adequate transportation Goods RFQ TBD TBD of laboratory specimen: (National) • Purchase solar refrigerators (2) and regular refrigerators - Main Lab and Portsmouth • sturdy Icebox coolers – Type 3 District Health Centers (7) transportation of samples • shipping containers – Main lab (for shipping samples overseas) 9 Training for managing essential Training TBD Laboratory functions 10 Consultant to Develop and Consulta IC TBD TBD implement Quality Management ncy national System 11 Mapping of prevalence of Goods/IC RFQ TBD TBD communicable diseases - including T (National) vector borne diseases and leptospirosis. Mapping i.e. geocode of No Re Activity Description Type of Selection Contract Contract Completion Date . f. Procure Signing Date (Planned) Method No ment (Planned) . all health facilities and towns/villages/hamlets •Equipment – GPS device (Garmin eTrex 20x GPS), 5qty. •GIS software 12 Training of Mapping i.e. geocode of Training all health facilities and towns/villages/hamlets on the Island 13 Set up and equip situation room Goods/IC RFQ TBD TBD Command Centre Communication T (National) Equipment to include 14 Set up and equip situation Goods/IC RFQ TBD TBD Room/HEOCs/Emergency Command T (National) Centre 15 Strengthen health information Goods/IC RFQ TBD TBD system. Equipment for Health T (National) Information Unit 16 Strengthening public health system Consulta TBD TBD by improving public health ncy IC emergency response to control (Internatio disease outbreaks and surveillance nal) systems No Re Activity Description Type of Selection Contract Contract Completion Date . f. Procure Signing Date (Planned) Method No ment (Planned) . 17 Health Emergency Preparedness plan Consulta IC National TBD TBD ncy 18 Project Officer for implementation Consulta IC TBD TBD (duration of the project) ncy National 19 Short Service Contracts in: Consulta IC National TBD TBD ncy • Procurement (when required) • Audit (annually) • Environmental safeguard Multiple (during retrofitting) TOTAL 4. Procurement Plan for the Project- St. Vincent Contract Contract Type of Signing Activity Description Selection Method Completion Date Procurement Date (Planned) (Planned) COMPONENT 1 Upgrade works for priority health facilities based on PAHO Smart Hospital criteria including Contract Contract Type of Signing Activity Description Selection Method Completion Date Procurement Date (Planned) (Planned) renovations, and retrofitting, furniture & equipment Design/supervision Consultancy CQS 15-Dec-19 30-Apr-22 Upgrade Works- Works RFB (National) 15-Apr-20 15-Apr-21 Furniture/equipment Goods RFQ (National) 15-Mar-21 15-Apr-21 Lab Equipment Goods RFQ (National) 15-Mar-21 15-Apr-21 Construction/Create a Public Health Laboratory Design/supervision - 50000 Consultancy CQS 15-Dec-19 30-Apr-22 Works - 1475000 Works RFB (National) 15-Apr-20 15-Apr-22 Public health Laboratory Equipment Goods/ICT RFQ (National) 15-May-21 15-May-22 300000 Furniture & Equipment - 100000 Goods/ICT RFQ (National) 15-May-21 15-May-22 Contract Contract Type of Signing Activity Description Selection Method Completion Date Procurement Date (Planned) (Planned) Strengthened laboratory data management systems - Lab Goods/ICT RFQ (National) 15-May-21 15-May-22 Information System with Health Information System (HIS) Improve the transportation system for laboratory specimens - Cold Goods/ICT RFQ (National) 15-Jul-21 15-Jul-22 chain and laboratory specimen transportation vehicle Strengthen Local capacity to utilize an enhanced regional reference Consultancy CQS 15-Jul-21 15-Jul-22 laboratory Training in Modern Laboratory Technology, Food Safety, Consultancy CQS 15-Jun-21 15-Jun-22 Entomology etc. Implement a regional quality assurance program and develop Consultancy CQS 15-Jun-21 15-Jun-22 common standards for National Laboratories, SVG. Provide training to ensure sufficient human resource capacity for Consultancy CQS 15-May-21 15-May-22 managing essential laboratory functions Contract Contract Type of Signing Activity Description Selection Method Completion Date Procurement Date (Planned) (Planned) Regional Accreditation of laboratories with quality standards Consultancy CQS 15-May-21 15-May-22 and development of quality assurance programs COMPONENT 2 Update/develop protocols (including development of an active case- Consultancy CQS 15-Mar-21 15-Sep-21 finding protocol for vector-borne diseases and clinical protocols) Strengthen health information systems for collection of incidence and prevalence data (HIS) ICT Equipment Goods/ICT RFQ (National) 15-Aug-21 15-Aug-23 Consultancy for ICT assessment, Consultancy CQS 15-Aug-21 15-Aug-23 training - Roll-out Field Epidemiology and Laboratory Training Program Consultancy CQS 15-Nov-19 15-Nov-20 (FELTP) among field-level epidemiologists (as needed) Contract Contract Type of Signing Activity Description Selection Method Completion Date Procurement Date (Planned) (Planned) Develop procedures on disease surveillance and information sharing with regard to infectious disease Consultancy CQS 15-Jan-20 15-Jan-21 protocols - microcephaly testing and confirmation in pregnant women suspected to be Zika infected Develop regional information and communications technology platform for surveillance and Consultancy CQS management, including Geographic Information Systems (GIS) 15-Jan-20 15-Jan-21 Renovation of Health Emergency Disaster Management Unit facility Design and supervision - Consultancy CQS 15-Dec-19 30-Apr-22 Works Works RFB (National) 15-Apr-20 15-Apr-21 EOC Equipment Goods/ICT RFB (National) 15-Apr-20 15-Apr-21 Disaster Supplies &Equipment- Goods/ICT RFB (National) 15-Apr-20 15-Apr-21 Furniture & Fixtures Goods/ICT RFB (National) 15-Apr-20 15-Apr-21 Contract Contract Type of Signing Activity Description Selection Method Completion Date Procurement Date (Planned) (Planned) Emergency Response Equipment Goods/ICT RFB (National) 15-Apr-20 15-Apr-21 Pickup truck (4ton) retrofitted with Goods/ICT RFB (National) 15-Apr-20 15-Apr-21 trailer truck Create external monitoring and assessment of core public health capacities of national structures to Consultancy meet International Health Regulations CQS 15-Jun-20 15-Dec-20 Plan and conduct simulation exercises and training on joint outbreak investigations as part of Consultancy CQS an early warning and response system 15-Jun-20 15-Dec-20 Develop/upgrade curriculum for training of country level health workforce in surveillance and Consultancy response for priority infectious diseases CQS 15-Dec-20 15-May-21 Component 3 Contract Contract Type of Signing Activity Description Selection Method Completion Date Procurement Date (Planned) (Planned) Project Financial Specialist Consultancy IC 1-Feb-20 1-Feb-24 Procurement Specialist Consultancy IC 1-Feb-20 1-Feb-24 Fiduciary capacity building for implementation - MOHWE staff Training trained to an enhanced fiduciary level NA 1-Oct-19 1-Oct-21 Project Monitoring and evaluation of Consultancy project activities IC 1-Oct-19 2-Oct-21 Project Audit Consultancy LCS 1-Feb-20 1-Feb-24 Biohazard Waste Management Plan Consultancy IC 1-Feb-20 1-Feb-23 Environmental and Social Consultancy Management Framework (ESMF) CQS 1-Feb-20 1-Feb-23 Office set up Goods DS 1-Sep-19 1-Dec-19 Operational Expenses N/A N/A TOTAL 5. Procurement Plan for the Project- CARPHA Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment Laboratory 1 - 2.1 G RFB 30-Sep-19 30-Nov-19 Equipment 1 - 2.1.6 Reagents G Single Source 30-Sep-19 29-Sep-24 Shipping 1 - 4.2.2 G RFQ 31-Jul-19 30-Sep-19 materials 2- Stationery and G RFQ 30-Sep-19 29-Sep-24 1.1.10 printing costs 2- Promotional G RFQ 27-Jul-20 30-Sep-20 1.1.11 materials 2- 3.3d/3.3 IT Goods G RFQ 30-Oct-19 29-Oct-20 f IT equipment for CARPHA; 2 - 1.1.9 country training G RFQ 29-May-20 31-Jul-20 and field projects Maintenance of Laboratory Equi 1 - 2.1.7 30-Sep-19 29-Sep-24 p-ment (New & Existing) NCS RFB Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment Proficiency testing (PT) programme for OECS 1- (including TR NA 30-Sep-19 30-Sep-24 3.1.1a standards, monitoring and supportive interventions) Perform PT at CARPHA to ensure that the 1- quality of testing NCS Single Source 30-Sep-19 29-Sep-24 3.1.1c services is being maintained and monitored Provide broadband service to 2 - 3.3e NCS RFQ 1-Oct-19 29--aug-24 support increased internet capacity Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment Establishment of a regional system for 1 1 - 1.2.5 CS Single Source 30-Sep-19 14-Oct-19 validation of equipment and methods Software: Inform ation management 2 1 - 2.2.1 capacity for 25-Aug-21 integrated surveillance approaches CS FBS 26-Feb-21 Support mechanism for 3 1 - 2.2.2 inter-country 29-Jun-21 technical collaboration CS FBS 30-Jun-20 LIMS 4 1 - 2.2.3 Consultant/Deve 29-Oct-21 loper CS CQS 30-Jun-20 Building CARPHA 5 1 - 2.2.4 CS 30-Sep-19 29-Mar-22 LIMS capacity CQS 6 1-6 Communication CS CQS 30-Oct-20 30-Jul-22 products for Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment laboratory services Level III training 7 2 - 1.1.2 curriculum CS CQS 31-Aug-20 30-Apr-21 development "Train the trainers" progra m to increase 8 2 - 1.1.3 country capacity TR NA 31-Aug-20 30-Apr-21 for FELTP - Hire Training Consultant Upgrade and maintain 9 2 - 1.1.5 capacity for CS CQS 30-Sep-19 29-Sep-24 eLearning Platform - Contracts for 10 2 - 1.1.6 Subject Matter CS CQS 30-Jun-20 31-Aug-21 Experts (SMEs) - Contract for Training 11 2 - 1.1.6 CS CQS 30-Sep-19 31-Aug-20 Development consultant Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment Independent peer review/assessm ent of CARPHA’s existing 12 2 - 2.1b surveillance CS CQS 30-Jul-19 30-Nov-19 system and its adequacy to fulfil its public health surveillance role In-country support to developing routine reporting structures for 13 2 - 2.1d populating CS CQS 30-Oct-20 29-Oct-22 yearly ministerial report, also known as CMO Report Update and produce CARPHA 14 2 - 2.2a Data CS CQS 30-Oct-19 29-Oct-20 Appreciation and M&E manuals, Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment materials and tools to support public health surveillance Develop and roll out ICD-11 selection of underlying 15 2 - 2.6 cause of death CS IC 4-Jan-21 30-Oct-21 training towards the strengthening of mortality data Upgrade (to ICD- 11) and enhance, 16 2 - 2.8 CS CQS 2-Mar-21 30-Jun-21 mortality data capture tool (MORTBASE) Morbidity coding training 17 2 - 2.9a workshop to CS IC 1-Nov-20 30-Jun-22 improve morbidity data 18 2 - 3.1a IT Gap analysis, CS CQS 30-Jan-20 30-Mar-20 needs Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment assessment and architecture design to support CARPHA Regional Surveillance system Draft CARPHA's surveillance platform (using DHIS2) to integrate GIS 19 2 - 3.1 b CS CQS 30-Sep-21 2-Jan-22 and data visualization to enhance real time reporting and feedback DHIS2 platform 20 2 - 3.3a Maintenance of CS CQS 1-Oct-19 29--aug-24 service contract Improve IT capacity at 21 2 - 3.3b CARPHA to host CS CQS 1-Jun-20 30-Nov-20 DHIS-2 installation Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment Gap analysis on Data sharing interoperability between the selected CMS 22 2 - 3.4 CS CQS 30-Sep-20 29-Oct-21 using CARPHA LIMS and automatically importing data into DHIS2. Development of a mobile app for public health 23 2 - 3.5 alerts and CS CQS 30-Oct-20 29-Oct-21 dissemination of public health information Knowledge 24 2 - 3.6 CS CQS 30-Oct-19 29-Sep-22 Management Development of the action plan 25 2 - 4.2 for regional CS IC 30-Oct-20 30-Jun-21 preparedness and response 26 2 - 4.6 Simulation CS CQS 30-Sep-21 29-Sep-24 Exercise on Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment responding to public health emergencies Continued Implementation of 27 2 - 5.1 CS CQS 31-Jul-20 31-Jan-21 Communication and Marketing Plan Development of country-level National Action 28 2 - 6 CS QCBS 30-Aug-23 Pan for Health Security (NAPHS) 1-Sep-21 Regional level 29 2 - 7 workshop on JEE TR TR 29-Sep-20 self-evaluation 30-Sep-19 Development and Implementation 30 3 - 3.2.6 of CS CQS Communication Strategy for Increased 30-Sep-19 30-Aug-24 Visibility of Type of N Activity Selection Me Contract Signing Contract Completion Ref. No. Procure o. Description thod Date (Planned) Date (Planned) ment Grant, its outputs and outcomes 31 3 - 3.2.1 Project Officer CS IC 1-Oct-19 30-Sep-24 32 3 - 3.2.1 M&E officer CS IC 1-Oct-19 30-Sep-24 33 3 - 3.2.1 Finance Officer CS IC 1-Oct-19 30-Sep-24 Procurement 34 CS IC Officer 1-Oct-19 30-Sep-24 Total Amount 6. Procurement Plan for the Project- Grenada Re Type of N f. Selection Me Contract Signing Contract Completion Activity Description Procurem o. No thod Date (Planned) Date (Planned) ent . Procurement of upgrade works at 1 Mount Gay Psychiatric Works RFB 4-Jul-20 31-Jul-23 Hospital Re Type of N f. Selection Me Contract Signing Contract Completion Activity Description Procurem o. No thod Date (Planned) Date (Planned) ent . Consultancy to conduct situational analysis to establish Consultan 2 CQS 4-Nov-19 1-Mar-20 baseline for Child & cy Geriatric Mental health Services Procurement of upgrades and refurbishment to the 3 Works RFB 1-Nov-21 29-Jul-22 Isolation Room, ICU of the General Hospital and Rathdune Expansion of 5 Sauteaurs Health Works RFB 1-Mar-22 31-Aug-22 Centre Expansion of St. 6 David's Health Centre Works RFB 11-Jan-21 28-Apr-22 Consultancy to Implement critical Consultan 7 CQS 2-Mar-20 31-Dec-21 health system cy upgrades Re Type of N f. Selection Me Contract Signing Contract Completion Activity Description Procurem o. No thod Date (Planned) Date (Planned) ent . Procurement of equipment for the 9 Goods DS 1-Nov-19 30-Jun-20 upgrade of laboratory facilities Consultancy to Consultan 10 strengthen laboratory IC 1-Nov-19 31-Dec-20 cy information system Procurement of 11 equipment to Goods RFQ (National) 2-Mar-20 31-Dec-20 strengthen LIS Procurement of equipment to improve 12 Goods RFB 2-Mar-20 31-Dec-20 efficiency of lab operations Design and Supervision for the refurbishment of Mount Gay Hospital, Consultan 13 QCBS 5-Apr-20 31-Dec-24 General Hospital cy (Rathdune), Sauteurs and St. David's Health Centres Re Type of N f. Selection Me Contract Signing Contract Completion Activity Description Procurem o. No thod Date (Planned) Date (Planned) ent . Procurement of Furniture and 14 Goods RFB 1-Mar-22 31-Aug-23 Equipment for refurbished buildings Training in 13 Procurement for Staff Training TR 11-Mar-19 31-Jan-20 (Biomedical) Consultancy to provide Short Term IC 1-Jan-20 31-Dec-20 Training for New Lab Consultan 14 Technicians cy Consultancy to provide national training programme DS 1-Sep-20 1-Dec-23 for laboratory Consultan 14 technicians cy Consultancy to strengthen Consultan DS 15 surveillance systems cy 6-Jul-20 1-Jun-23 Re Type of N f. Selection Me Contract Signing Contract Completion Activity Description Procurem o. No thod Date (Planned) Date (Planned) ent . Strengthen Surveillance Systems TR 16 FELTP Training 1 & 2 Training 1-Sep-20 31-Jul-24 Consultancy to provide morbidity and Consultan DS 17 mortality Surveillance cy 1-Feb-21 31-Dec-22 Procurement of Hardware and RFQ software for chronic 18 disease registry Goods 1-Jul-20 31-Dec-20 Consultancy to guide in the development of Consultan IC 19 HEOC cy 1-Jan-20 30-Apr-20 Consultancy and implementation of Consultan IC 20 desktop simulation cy 1-Jan-24 31-Aug-24 Consultancy for the Training of emergency Consultan CQS 21 technicians cy 1-Jan-20 31-Jul-21 Procurement of ambulances, and RFB emergency response 22 vehicles Goods 1-Jan-21 31-Dec-21 Re Type of N f. Selection Me Contract Signing Contract Completion Activity Description Procurem o. No thod Date (Planned) Date (Planned) ent . Procurement of communications RFQ 23 equipment for HEOC Goods 1-Oct-20 30-Jul-21 Procurement of RFQ 24 Computer Equipment Goods 1-Oct-20 30-Jul-21 Procurement of Personal Protective RFQ 25 Equipment Goods 1-Oct-20 31-Dec-21 Training in TR 26 Psychological First Aid Training 1-Sep-20 30-Sep-21 Consultan IC 27 Project Coordinator cy 11-Nov-19 31-Dec-24 Procurement of RFQ 28 Project Vehicle Goods 11-Nov-19 31-Jan-20 Procurement of Computer and RFQ Acceories for Project 29 Office Goods 11-Nov-19 31-Jul-20 Project Operating Cost NA NA NA NA Re Type of N f. Selection Me Contract Signing Contract Completion Activity Description Procurem o. No thod Date (Planned) Date (Planned) ent . 30 Project Visibility NCS RFQ 1-Feb-20 4-Feb-20 Consultan IC 31 Project M & E Officer cy 1-Jan-21 31-Dec-21 Capacity Building for TR 32 Staff Training September,2020 1-Dec-22 Total PROCUREMENT OECS Countries : OECS Regional Health Project PLAN General Information Country: OECS Countries Bank’s Approval Date of the Original Procurement Plan: 2020-03-23 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168539 GPN Date: 2020-05-21 Project Name: OECS Regional Health Project Loan / Credit No: IDA / 64760, IDA / 64780 P Executing Agency(ies): roject Coordination Unit - Ministry of Finance WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GD-PCU - GRENADA-174511- Under CW-DIR / Retrofit "Old CID Contingency Emergency 2020-12- IDA / 64760 Post Direct Selection Direct 185,000.00 0.00 Implementat 2020-05-25 2020-03-13 2020-05-30 2020-07-04 Building" to Isolation ward for Response Component (CERC) 31 ion public health emergencies GD-PCU - GRENADA-146601- Pending Improved Health Facilities Single Stage - One 2023-04- CW-RFB / Expansion of St. IDA / 64760 Post Request for Bids Open - National 255,000.00 0.00 Implementat 2022-07-01 2022-07-06 2022-08-17 2022-09-16 2022-10-21 and Laboratory Capacity Envelope 19 David's Health Centre ion GD-PCU - GRENADA-146588- Pending CW-RFB / Procurement of Improved Health Facilities Single Stage - One 2023-02- IDA / 64760 Post Request for Bids Open - National 1,215,000.00 0.00 Implementat 2022-04-19 2022-04-24 2022-06-05 2022-07-05 2022-08-09 upgrade works at Mount Gay and Laboratory Capacity Envelope 05 ion Psychiatric Hospital GD-PCU - GRENADA-146600- Pending Improved Health Facilities Single Stage - One 2023-04- CW-RFB / Expansion of IDA / 64760 Post Request for Bids Open - National 416,500.00 0.00 Implementat 2022-07-01 2022-07-06 2022-08-17 2022-09-16 2022-10-21 and Laboratory Capacity Envelope 19 Sauteurs Health Centre ion GD-PCU - GRENADA-146597- CW-RFB / Procurement of Request for Bids - Pending Upgrades and refurbishment Improved Health Facilities Single Stage - One Works (without 2022-02- IDA / 64760 Post Request for Bids Open - National 595,000.00 0.00 Implementat 2021-05-01 2021-05-06 2021-06-17 2021-07-17 2021-08-21 to the isolation Room, ICU of and Laboratory Capacity Envelope prequalification) 17 ion the General Hospital and SPD Rathdune GD-PCU - GRENADA-174486- NC-RFB / Procurement of oxygen generation plant for Request for Bids - Pending production of oxygen at the Contingency Emergency Single Stage - One Works (without 2022-06- IDA / 64760 Post Request for Bids Open - National 220,000.00 0.00 Implementat 2021-09-01 2021-09-06 2021-10-18 2021-11-17 2021-12-22 General Hospital for use on- Response Component (CERC) Envelope prequalification) 20 ion site and deliver to subsidiary SPD hospital and community health services GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD-PCU - GRENADA-174475- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Open - International 343,395.00 0.00 Canceled 2020-05-30 2020-07-25 2021-01-21 Personal Protective Equipment Response Component (CERC) Quotations Envelope (PPE) GD-PCU - GRENADA-174476- Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of IDA / 64760 Post Open - International 1,643.00 0.00 Canceled 2020-05-30 2020-07-25 2021-01-21 Response Component (CERC) Quotations Envelope Uniform for Frontline Staff GD-PCU - GRENADA-174493- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One handheld infrared IDA / 64760 Post Open - International 811.00 0.00 Canceled 2020-05-30 2020-07-25 2021-01-21 Response Component (CERC) Quotations Envelope thermometers for health centers and medical stations GD-PCU - GRENADA-174498- GO-RFQ / Procurement of supporting equipment and Pending supplies to establish testing Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 65,000.00 0.00 Implementati 2021-07-10 2021-09-04 2022-03-03 capacity to respond tot he Response Component (CERC) Quotations Envelope on Covid-19 Pandemic and response capacity for future outbreaks GD-PCU - GRENADA-174512- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 5,223.00 0.00 Canceled 2020-05-30 2020-07-25 2021-01-21 Closed Circuit Camera System Response Component (CERC) Quotations Envelope for Isolation Ward GD-PCU - GRENADA-188357- GO-DIR / Procurement of Contingency Emergency IDA / 64760 Post Direct Selection Direct 343,395.00 31,395.00 Signed 2020-08-11 2020-03-09 2020-08-16 2020-03-13 2020-09-20 2020-04-16 2021-03-19 Personal Protective Equipment Response Component (CERC) (PPE) GD-PCU - GRENADA-191239- Under GO-DIR / Procurement of Contingency Emergency IDA / 64760 Post Direct Selection Direct 1,643.00 5,302.12 Implementati 2020-09-03 2020-04-20 2020-09-08 2020-04-22 2020-10-13 2021-04-11 uniforms for front line Response Component (CERC) on workers GD-PCU - GRENADA-191243- Under GO-DIR / Procurement of Contingency Emergency IDA / 64760 Post Direct Selection Direct 5,223.00 0.00 Implementati 2020-09-02 2020-03-17 2020-09-07 2020-10-12 2021-04-10 closed circuit camera system Response Component (CERC) on for isolation unit. GD-PCU - GRENADA-203078- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 57,857.00 12,189.58 Completed 2020-11-28 2020-11-26 2021-01-23 2021-01-06 2021-07-22 2021-01-22 thermometers for schools and Response Component (CERC) Quotations Envelope other public health facilities. GD-PCU - GRENADA-203075- Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of IDA / 64760 Post Limited 75,000.00 37,979.70 Completed 2020-11-14 2020-11-17 2021-01-09 2021-01-15 2021-07-08 2021-01-26 Response Component (CERC) Quotations Envelope Hand Sanitizing Liquid. Page 1 GD-PCU - GRENADA-203076- Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of IDA / 64760 Post Limited 75,000.00 56,543.50 Completed 2020-11-14 2020-11-17 2021-01-09 2021-01-06 2021-07-08 2021-01-28 Response Component (CERC) Quotations Envelope Liquid Hand Soap. GD-PCU - GRENADA-203073- GO-RFQ / Procurement of a Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 75,000.00 77,221.77 Completed 2020-11-14 2020-11-17 2021-01-09 2021-01-13 2021-07-08 2021-01-22 truck and a COVID 19 Response Component (CERC) Quotations Envelope Response Vehicle. GD-PCU - GRENADA-203074- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 50,000.00 67,382.03 Completed 2020-11-14 2020-11-17 2021-01-09 2021-01-06 2021-07-08 2021-01-29 Sanitizing Response Component (CERC) Quotations Envelope Equipment/Dispensers GD-PCU - GRENADA-203081- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 70,000.00 0.00 Canceled 2020-11-14 2021-01-09 2021-07-08 media campaign materials Response Component (CERC) Quotations Envelope (posters, stickers, etc) GD-PCU - GRENADA-203079- GO-DIR / Procurement of Contingency Emergency IDA / 64760 Post Direct Selection Direct 120,000.00 102,451.60 Completed 2020-11-30 2020-12-28 2020-12-05 2021-01-04 2021-01-09 2021-01-12 2021-07-08 2021-01-25 reagent as required to Response Component (CERC) strengthen primary healthcare. GD-PCU - GRENADA-215636- GO-DIR / Procurement of a Contingency Emergency IDA / 64760 Post Direct Selection Direct 35,000.00 33,653.14 Completed 2021-01-23 2021-01-14 2021-01-28 2021-01-18 2021-03-04 2021-01-21 2021-08-31 2021-01-22 Utility vehicle - Multii- Response Component (CERC) passenger bus GD-PCU - GRENADA-215638- GO-RFQ / Procurement of a Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 85,000.00 58,663.47 Completed 2021-01-28 2021-01-15 2021-03-25 2021-01-26 2021-09-21 2021-01-28 surveillance and utility pick- Response Component (CERC) Quotations Envelope up GD-PCU - GRENADA-216171- Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of IDA / 64760 Post Limited 3,000.00 3,485.39 Completed 2021-01-31 2021-01-26 2021-03-28 2021-01-29 2021-09-24 2021-01-29 Response Component (CERC) Quotations Envelope Batteries for the Dispensers. GD-PCU - GRENADA-191241- GO-DIR / Procurement of handheld thermometers to Contingency Emergency IDA / 64760 Post Direct Selection Direct 811.00 0.00 Canceled 2020-09-02 2020-03-03 2020-09-07 2020-02-05 2020-10-12 2021-04-10 strengthen community Response Component (CERC) surveillance and contact tracing activities. GD-PCU - GRENADA-150105- Pending GO-RFB / Procurement of Improved Health Facilities Single Stage - One IDA / 64760 Post Request for Bids Open - National 215,000.00 0.00 Implementati 2023-07-01 2023-07-06 2023-08-17 2023-09-16 2023-10-21 2024-04-18 Furniture and Equipment for and Laboratory Capacity Envelope on Refurbished Buildings GD-PCU - GRENADA-224394- Under Contingency Emergency GO-DIR / Procurement of 100 IDA / 64760 Post Direct Selection Direct 12,075.00 0.00 Implementati 2021-03-15 2020-03-10 2021-03-20 2020-03-12 2021-04-24 2021-10-21 Response Component (CERC) Infrared Thermometers on GD-PCU - GRENADA-224400- Contingency Emergency GO-DIR / Procurement of IDA / 64760 Post Direct Selection Direct 3,800.00 0.00 Canceled 2021-03-15 2021-03-20 2021-04-24 2021-10-21 Response Component (CERC) Ultra Mega Storage Cabinets GD-PCU - GRENADA-203262- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One Emergency Personal Protective IDA / 64760 Post Limited 100,000.00 0.00 Canceled 2020-11-18 2021-01-13 2021-07-12 Response Component (CERC) Quotations Envelope Equipment (PPE) for Educational Institutions. GD-PCU - GRENADA-174490- GO-RFQ / Procurement of of Goods and Services to Contingency Emergency Request for Single Stage - One IDA / 64760 Post Open - International 140,000.00 0.00 Canceled 2021-03-30 2021-05-25 2021-11-21 enhance preparedness and Response Component (CERC) Quotations Envelope surveillance systems at ports of entry for IHR Compliance GD-PCU - GRENADA-174477- Pending GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 300,000.00 0.00 Implementati 2021-08-07 2021-10-02 2022-03-31 Personal Protective Equipment Response Component (CERC) Quotations Envelope on (PPE) GD-PCU - GRENADA-150072- GO-RFQ / Procurement of Pending Improved Health Facilities Request for Single Stage - One Equipment to Strengthen IDA / 64760 Post Open - National 30,000.00 0.00 Implementati 2021-08-07 2021-10-02 2022-03-31 and Laboratory Capacity Quotations Envelope Laboratory Management on Information System (LMIS) GD-PCU - GRENADA-150384- GO-RFQ / Procurement of Strengthening Public Health Pending Request for Single Stage - One Communications Equipment IDA / 64760 Surveillance and Emergency Post Limited 100,000.00 0.00 Implementati 2022-01-19 2022-03-16 2022-09-12 Quotations Envelope for Health Emergency Management on Operating Centre (HEOC) GD-PCU - GRENADA-150387- Strengthening Public Health Pending Request for Single Stage - One GO-RFQ / Procurement of IDA / 64760 Surveillance and Emergency Post Limited 100,000.00 0.00 Implementati 2022-01-19 2022-03-16 2022-09-12 Quotations Envelope Personal Protective Equipment Management on GD-PCU - GRENADA-150386- Strengthening Public Health Pending GO-RFQ / Procurement of Request for Single Stage - One IDA / 64760 Surveillance and Emergency Post Limited 20,000.00 0.00 Implementati 2021-10-09 2021-12-04 2022-06-02 Computer Equipment for Quotations Envelope Management on HEOC GD-PCU - GRENADA-150377- Strengthening Public Health Pending GO-RFQ / Procurement of Request for Single Stage - One IDA / 64760 Surveillance and Emergency Post Limited 23,500.00 0.00 Implementati 2021-07-06 2021-08-31 2022-02-27 Hardware and Software for Quotations Envelope Management on chronic disease registry GD-PCU - GRENADA-224654- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 1,570.00 1,568.27 Completed 2021-03-20 2021-01-19 2021-05-15 2021-01-26 2021-11-11 2021-01-29 Exercise Books for Media Response Component (CERC) Quotations Envelope Awareness Campaign Page 2 GD-PCU - GRENADA-224657- GO-RFQ / Procurement of Copy Paper for use in the Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 1,000.00 922.97 Completed 2021-03-20 2021-01-26 2021-05-15 2021-01-27 2021-11-11 2021-01-29 printing of the exercise books Response Component (CERC) Quotations Envelope for the Media Awareness Campaign. GD-PCU - GRENADA-174500- Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of PCR IDA / 64760 Post Limited 35,000.00 0.00 Canceled 2021-02-13 2021-04-10 2021-10-07 Response Component (CERC) Quotations Envelope compatible test kits GD-PCU - GRENADA-174497- GO-RFQ / Procurement of Infrared thermometers to Contingency Emergency Request for Single Stage - One IDA / 64760 Post Open - International 40,000.00 0.00 Canceled 2020-08-08 2020-10-03 2021-04-01 strengthen community Response Component (CERC) Quotations Envelope surveillance and contact tracing activities GD-PCU - GRENADA-174488- Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of an IDA / 64760 Post Limited 75,472.00 0.00 Canceled 2020-08-08 2020-10-03 2021-04-01 Response Component (CERC) Quotations Envelope Ambulance GD-PCU - GRENADA-174489- Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of 2 IDA / 64760 Post Limited 67,900.00 0.00 Canceled 2020-08-15 2020-10-10 2021-04-08 Response Component (CERC) Quotations Envelope Utility Vehicles GD-PCU - GRENADA-215639- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 50,000.00 47,011.23 Completed 2021-01-28 2021-01-19 2021-03-25 2021-01-29 2021-09-21 2021-01-30 Medical furniture, fixtures and Response Component (CERC) Quotations Envelope supplies part 1 GD-PCU - GRENADA-225469- GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 30,000.00 13,602.04 Completed 2021-03-27 2021-01-19 2021-05-22 2021-01-27 2021-11-18 2021-01-29 Medical furniture, fixtures and Response Component (CERC) Quotations Envelope supplies part 2 GD-PCU - GRENADA-228359- Pending GO-RFQ / Procurement of Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 30,000.00 0.00 Implementati 2021-04-17 2021-06-12 2021-12-09 Medical furniture, fixtures and Response Component (CERC) Quotations Envelope on supplies part 2b GD-PCU - GRENADA-224655- GO-DIR / Procurement of Pending Contingency Emergency Toner for printing of Exercise IDA / 64760 Post Direct Selection Direct 3,200.00 0.00 Implementati 2021-05-24 2021-05-29 2021-07-03 2021-12-30 Response Component (CERC) covers for Media Awareness on Campaign. GD-PCU - GRENADA-224658- GO-RFQ / Procurement of Pending Contingency Emergency Request for Single Stage - One Covid-19 protocols and public IDA / 64780 Post Limited 150,000.00 0.00 Implementati 2021-03-20 2021-05-15 2021-11-11 Response Component (CERC) Quotations Envelope awareness / risk mitigation on for IHR Compliance GD-PCU - GRENADA-150390- Institutional Capacity Pending Request for Single Stage - One GO-RFQ / Procurement of IDA / 64760 Building, Project Management Post Limited 30,000.00 0.00 Implementati 2021-04-03 2021-05-29 2021-11-25 Quotations Envelope Project Vehicle and Coordination on GD-PCU - GRENADA-150391- Institutional Capacity Pending GO-RFQ / Procurement of Request for Single Stage - One IDA / 64760 Building, Project Management Post Limited 15,000.00 0.00 Implementati 2021-05-08 2021-07-03 2021-12-30 Computer and Accessories for Quotations Envelope and Coordination on Project Office GD-PCU - GRENADA-224832- Pending Contingency Emergency GO-DIR / Procurement of PCR IDA / 64760 Post Direct Selection Direct 35,000.00 0.00 Implementati 2021-03-31 2021-04-05 2021-05-10 2021-11-06 Response Component (CERC) Test Kits. on GD-PCU - GRENADA-225459- Contingency Emergency Single Stage - One GO-RFB / Procurement of IDA / 64760 Post Request for Bids Limited 173,372.00 0.00 Canceled 2021-03-29 2021-04-03 2021-05-15 2021-06-14 2021-07-19 2022-01-15 Response Component (CERC) Envelope Vehicles GD-PCU - GRENADA-162616- Pending GO-RFQ / Procurement of Improved Health Facilities Request for Single Stage - One IDA / 64760 Post Limited 100,000.00 0.00 Implementati 2021-05-08 2021-07-03 2021-12-30 Equipment for the upgrade of and Laboratory Capacity Quotations Envelope on laboratory facilities GD-PCU - GRENADA-225461- Pending Contingency Emergency GO-DIR / Procurement of IDA / 64760 Post Direct Selection Direct 40,000.00 0.00 Implementati 2021-05-10 2021-05-15 2021-06-19 2021-12-16 Response Component (CERC) medical reagents and supplies on GD-PCU - GRENADA-203080- Pending GO-RFB / Procurement of Contingency Emergency Single Stage - One IDA / 64760 Post Request for Bids Limited 200,000.00 0.00 Implementati 2021-04-05 2021-04-10 2021-05-22 2021-06-21 2021-07-26 2022-01-22 medical furniture, fixtures and Response Component (CERC) Envelope on supplies GD-PCU - GRENADA-174478- GO-RFQ / Visibility Vests and Pending Contingency Emergency Request for Single Stage - One Decal for Ministry of Health IDA / 64760 Post Open - International 20,000.00 0.00 Implementati 2021-04-20 2021-06-15 2021-12-12 Response Component (CERC) Quotations Envelope Essential Service Staff and on First Responders GD-PCU - GRENADA-150074- Pending GO-RFB / Procurement of Improved Health Facilities Single Stage - One IDA / 64760 Post Request for Bids Open - National 380,000.00 0.00 Implementati 2021-04-15 2021-04-20 2021-06-01 2021-07-01 2021-08-05 2022-02-01 Equipment to improve and Laboratory Capacity Envelope on efficiency of Lab Operations GD-PCU - GRENADA-224398- Pending GO-DIR / Procurement of Contingency Emergency IDA / 64760 Post Direct Selection Direct 12,517.50 0.00 Implementati 2021-03-15 2021-03-20 2021-04-24 2021-10-21 Oxygen Bank Fixtures and Response Component (CERC) on Fittings GD-PCU - GRENADA-224395- Pending Contingency Emergency GO-DIR / Procurement of IDA / 64760 Post Direct Selection Direct 18,500.00 0.00 Implementati 2021-03-15 2021-03-20 2021-04-24 2021-10-21 Response Component (CERC) Ophthalmic Ultrasound on GD-PCU - GRENADA-224393- Pending GO-DIR / Procurement of RNA Contingency Emergency IDA / 64760 Post Direct Selection Direct 57,669.95 0.00 Implementati 2021-03-15 2021-03-20 2021-04-24 2021-10-21 Extraction Kits - Covid-19 Response Component (CERC) on testing laboratory Equipment. Page 3 GD-PCU - GRENADA-174513- GO-RFQ / Procurement of medical equipment to outfit Pending Contingency Emergency Request for Single Stage - One the Isolation Ward and IDA / 64760 Post Limited 540,556.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 Response Component (CERC) Quotations Envelope strengthen the Accident and on Emergency and Intensive Care Unit GD-PCU - GRENADA-150382- Strengthening Public Health Pending GO-RFB / Procurement of Single Stage - One IDA / 64760 Surveillance and Emergency Post Request for Bids Open - International 250,000.00 0.00 Implementati 2021-05-24 2021-05-29 2021-07-10 2021-08-09 2021-09-13 2022-03-12 Ambulances, and Emergency Envelope Management on Response Vehicles. GD-PCU - GRENADA-224392- Pending Contingency Emergency GO-DIR / Procurement of 3- IDA / 64760 Post Direct Selection Direct 21,332.26 0.00 Implementati 2021-05-24 2021-05-29 2021-07-03 2021-12-30 Response Component (CERC) ply face masks on GD-PCU - GRENADA-174479- Pending Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of IDA / 64760 Post Open - International 20,000.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 Response Component (CERC) Quotations Envelope pulse oxi-meters on GD-PCU - GRENADA-224391- Pending Contingency Emergency GO-DIR / Procurement of PPE' IDA / 64760 Post Direct Selection Direct 5,302.12 0.00 Implementati 2021-05-24 2021-05-29 2021-07-03 2021-12-30 Response Component (CERC) - Nursing Scrubs on GD-PCU - GRENADA-174501- GO-DIR / Procurement of laboratory Equipment to Pending strengthen diagnostic services Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 255,000.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 for pandemic response and to Response Component (CERC) Quotations Envelope on support on-going accreditation of the Public Health Laboratory GD-PCU - GRENADA-174481- Pending Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement IDA / 64760 Post Open - International 10,000.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 Response Component (CERC) Quotations Envelope Portable oxygen concentrators on GD-PCU - GRENADA-174510- GO-RFQ / Procurement of IT equipment to strengthen Pending infrastructure for surveillance, Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 100,000.00 0.00 Implementati 2021-06-05 2021-07-31 2022-01-27 contact tracing, administrative Response Component (CERC) Quotations Envelope on support and communications for public health response systems GD-PCU - GRENADA-224390- Pending Contingency Emergency GO-DIR / Procurement of IDA / 64760 Post Direct Selection Direct 33,890.10 0.00 Implementati 2021-05-31 2021-06-05 2021-07-10 2022-01-06 Response Component (CERC) PPE's on GD-PCU - GRENADA-174489- Under Contingency Emergency Request for Single Stage - One GO-RFQ-2 / Procurement of IDA / 64760 Post Limited 80,000.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 Response Component (CERC) Quotations Envelope Panel Vans on GD-PCU - GRENADA-237676- Under Contingency Emergency Request for Single Stage - One GO-RFQ / Procurement of Pic- IDA / 64760 Post Limited 70,000.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 Response Component (CERC) Quotations Envelope up vans on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD-PCU - GRENADA-203083- NC-RFQ / Contracts for cleaning and sanitizing of health facilities, quarantine Contingency Emergency Request for Single Stage - One IDA / 64760 Post Limited 50,000.00 0.00 Canceled 2020-11-14 2021-01-09 2021-07-08 facilities and to mitigate Response Component (CERC) Quotations Envelope against the current dengue outbreak(Debris removal only). GD-PCU - GRENADA-210025- Contingency Emergency Request for Single Stage - One NC-RFQ / Communications / IDA / 64760 Post Limited 70,000.00 0.00 Canceled 2020-12-26 2021-02-20 2021-08-19 Response Component (CERC) Quotations Envelope Marketing Consultancy GD-PCU - GRENADA-210040- Contingency Emergency Request for Single Stage - One NC-RFQ / Media Awareness IDA / 64760 Post Open - National 70,000.00 0.00 Canceled 2020-12-26 2021-02-20 2021-08-19 Response Component (CERC) Quotations Envelope Campaign CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD-PCU - GRENADA-150380- Strengthening Public Health Consultant CS-CQS / Consultancy for Pending IDA / 64760 Surveillance and Emergency Post Qualification Open - International 150,000.00 0.00 2024-07-01 2024-07-22 2024-09-04 2024-10-04 2024-11-08 2025-05-07 Training of Emergency Implementation Management Selection Technicians GD-PCU - GRENADA-150098- CS-QCBS / Design and Supervision for the Improved Health Facilities Quality And Cost- Pending Refurbishment of Mt. Gay IDA / 64760 Post Open - National 330,000.00 0.00 2021-06-01 2021-06-22 2021-08-05 2021-09-02 2021-10-02 2021-11-06 2021-12-11 2022-12-11 and Laboratory Capacity Based Selection Implementation Hospital, General Hospital (Rathdune), Sauters and St. David's Health Centres GD-PCU - GRENADA-234231- CS-QCBS / Consultancy for Contingency Emergency Quality And Cost- IDA / 64760 Post Open - National 75,000.00 0.00 Canceled 2021-05-11 2021-05-04 2021-06-01 2021-05-26 2021-07-15 2021-08-12 2021-09-11 2021-10-16 2021-11-20 2022-11-20 Design and Supervision of the Response Component (CERC) Based Selection Oxygen Generation Plant Page 4 GD-PCU - GRENADA-146595- CS-CQS / Consultancy to Consultant conduct situational analysis to Improved Health Facilities Pending IDA / 64760 Post Qualification Open - National 150,000.00 0.00 2021-05-31 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 establish baseline for Child & and Laboratory Capacity Implementation Selection Geriatric Mental health Services GD-PCU - GRENADA-166118- CS-QCBS / Consultancy to Improved Health Facilities Quality And Cost- Pending IDA / 64760 Post Open - National 500,000.00 0.00 2021-05-31 2021-06-21 2021-08-04 2021-09-01 2021-10-01 2021-11-05 2021-12-10 2022-12-10 Implement critical health and Laboratory Capacity Based Selection Implementation system upgrades GD-PCU - GRENADA-240680- Consultant CS-CQS / Consultancy for Contingency Emergency Pending IDA / 64760 Post Qualification Open - National 75,000.00 0.00 2021-06-23 2021-07-14 2021-08-27 2021-09-26 2021-10-31 2022-04-29 Design and Supervision of the Response Component (CERC) Implementation Selection Oxygen Generation Plant INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD-PCU - GRENADA-150393- Institutional Capacity Individual Pending CS-INDV / Project Monitoring IDA / 64760 Building, Project Management Post Consultant Open 60,000.00 0.00 2021-08-15 2021-10-03 2021-10-24 2021-11-28 2022-05-27 Implementation and Evaluation Officer and Coordination Selection GD-PCU - GRENADA-150108- CS-CDS / Consultancy to Improved Health Facilities Pending provide National Training IDA / 64760 Post Direct Selection Direct 200,000.00 0.00 2021-09-01 2021-09-11 2021-11-15 2022-05-14 and Laboratory Capacity Implementation programme for Laboratory Technicians Institutional Capacity Individual GD-PCU - GRENADA-150389- IDA / 64760 Building, Project Management Post Consultant Open 160,000.00 62,924.86 Signed 2020-05-18 2020-02-06 2020-07-06 2020-12-12 2020-07-27 2021-02-22 2020-08-31 2021-02-19 2021-02-27 CS-INDV / Project Coordinator and Coordination Selection GD-PCU - GRENADA-162637- CS-INDV / Training in the Individual Improved Health Facilities Pending Procurement of Biomedical IDA / 64760 Post Consultant Open 15,000.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 and Laboratory Capacity Implementation Equipment - Biomedical and Selection Project Staff GD-PCU - GRENADA-150378- Strengthening Public Health Individual CS-INDV / Consultancy to Pending IDA / 64760 Surveillance and Emergency Post Consultant Open 50,000.00 0.00 2021-07-01 2021-08-19 2021-09-09 2021-10-14 2022-04-12 guide in the Development of Implementation Management Selection HEOC GD-PCU - GRENADA-150056- CS-INDV / Consultancy to Individual Improved Health Facilities Pending Strengthen Laboratory IDA / 64760 Post Consultant Open 120,000.00 0.00 2021-10-04 2021-11-22 2021-12-13 2022-01-17 2022-07-16 and Laboratory Capacity Implementation Management Information Selection System (LMIS) GD-PCU - GRENADA-162629- CS-CDS / Procurement of Short Term Services to Improved Health Facilities Pending support development of IDA / 64760 Post Direct Selection Direct 100,000.00 0.00 2020-05-18 2020-05-28 2020-08-01 2021-01-28 and Laboratory Capacity Implementation standard operating procedures to support Tier 1 Accreditation GD-PCU - GRENADA-150370- Strengthening Public Health CS-CDS / Consultancy to Pending IDA / 64760 Surveillance and Emergency Post Direct Selection Direct 20,000.00 0.00 2020-09-13 2020-09-23 2020-11-27 2021-05-26 provide morbidity and Implementation Management mortality Surveillance Training GD-PCU - GRENADA-150109- Strengthening Public Health CS-CDS / Consultancy to Pending IDA / 64760 Surveillance and Emergency Post Direct Selection Direct 200,000.00 0.00 2020-07-06 2020-07-16 2020-09-19 2021-03-18 Strengthen Surveillance Implementation Management Systems GD-PCU - GRENADA-150107- Individual CS-INDV / Consultancy to Improved Health Facilities Pending IDA / 64760 Post Consultant Open 50,000.00 0.00 2021-05-31 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Provide Short Term Training and Laboratory Capacity Implementation Selection for New Lab Technicians GD-PCU - GRENADA-239667- CS-INDV / Consulting Services Individual Improved Health Facilities Under to Develop an Integrated IDA / 64760 Post Consultant Open 30,000.00 0.00 2021-06-17 2021-06-10 2021-08-05 2021-08-26 2021-09-30 2022-03-29 and Laboratory Capacity Implementation Biomedical Waste Selection Management Plan (IBWMP) Page 5 Procurement Plan (P 155350) Sindh Resilience Project I. General 1. Bank’s approval Date of the procurement Plan [Original: February 28, 2016]: Revision of Updated Procurement Plan, May 2017 ] 2. Date of General Procurement Notice: August 2016 3. Period covered by this procurement plan: The procurement period of project covered from year May 2017 to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued by SID 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 July 9, 2010 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Pakistan : Sindh Resilience Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2016-11-03 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155350 GPN Date: 2016-10-28 Project Name: Sindh Resilience Project Loan / Credit No: IDA / 58880, IDA / 67940 P Executing Agency(ies): rovincial Disaster Management Authority Sindh WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PDMA-SINDH-225945- Pending CW-RFB / Construction of Strengthening Disaster and Single Stage - One 2023-01- IDA / 67940 Post Request for Bids Open - National 0.00 Implementat 2021-03-25 2021-03-30 2021-05-11 2021-06-10 2021-07-15 PDMA, Rescue1122 HQs, and Climate Risk Management Envelope 06 ion Rescue Station Karachi GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PDMA-SINDH-2804-GO- Strengthening Disaster and Request for Single Stage - One RFQ / Office Furniture and IDA / 58880 Prior Open - National 0.00 Canceled 2016-11-16 2017-01-11 2017-07-10 Climate Risk Management Quotations Envelope fixtures Pending PK-PDMA-SINDH-2805-GO- Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2016-12-06 2017-01-31 2017-07-30 RFQ / office vehicles Climate Risk Management Quotations Envelope on PK-PDMA-SINDH-2803-GO- Strengthening Disaster and Request for Single Stage - One RFQ / IT related Office IDA / 58880 Post Open - National 3,549.29 Completed 2016-12-05 2017-01-30 2017-06-07 2017-07-29 2017-06-09 Climate Risk Management Quotations Envelope Equipment PK-PDMA-SINDH-21597-GO- Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 9,609.97 Terminated 2017-07-29 2017-09-23 2018-03-22 RFQ / Office Equipments Climate Risk Management Quotations Envelope PK-PDMA-SINDH-54427-GO- Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Canceled 2018-03-21 2018-05-16 2018-11-12 RFQ / Office Supplies Climate Risk Management Quotations Envelope PK-PDMA-SINDH-107870- Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 56,730.39 Signed 2019-04-30 2019-06-25 2019-05-30 2019-08-24 GO-RFQ / Office Furniture Climate Risk Management Quotations Envelope PK-PDMA-SINDH-108299- Pending Strengthening Disaster and Request for Single Stage - One GO-RFQ / Office Furniture & IDA / 58880 Post Open - National 0.00 Implementati 2019-03-29 2019-03-29 2019-03-29 Climate Risk Management Quotations Envelope Equipment on PK-PDMA-SINDH-109707- Strengthening Disaster and Request for Single Stage - One GO-RFQ / Printing of IDA / 58880 Post Open - National 39,827.81 Signed 2019-04-12 2019-04-22 2019-04-15 2019-04-30 Climate Risk Management Quotations Envelope Awareness raising material PK-PDMA-SINDH-109712- Strengthening Disaster and Request for Single Stage - One GO-RFQ / Procurement of IDA / 58880 Post Open - National 23,328.14 Signed 2019-04-13 2019-05-05 2019-05-08 2019-05-13 Climate Risk Management Quotations Envelope equipment for heatwave PK-PDMA-SINDH-107866- Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 35,928.55 Signed 2019-04-18 2019-05-01 2019-05-31 2019-05-06 GO-RFQ / Office equipment Climate Risk Management Quotations Envelope PK-PDMA-SINDH-111594- Strengthening Disaster and Request for Single Stage - One GO-RFQ / 250 KV Diesel IDA / 58880 Post Open - National 31,882.65 Signed 2019-04-25 2019-05-14 2019-06-14 2019-05-22 Climate Risk Management Quotations Envelope Generator PK-PDMA-SINDH-110803- Strengthening Disaster and Request for Single Stage - One GO-RFQ / Procurement of IDA / 58880 Post Open - National 3,902.44 Signed 2019-04-18 2019-05-01 2019-06-12 2019-05-08 Climate Risk Management Quotations Envelope Motorcycles PK-PDMA-SINDH-128835- GO-RFB / Logistical Support Activity 1) Single Cab 4x4 - (6 Nos) 2) Double Cab 4x4 - (2 Nos) Strengthening Disaster and Single Stage - One 3) Trucks (MEOC & Training IDA / 58880 Prior Request for Bids Open - National 0.00 Canceled 2019-09-15 2019-09-20 2019-11-01 2019-12-01 2020-01-05 2020-07-03 Climate Risk Management Envelope Facilities) - (4 Nos) 4) Flat Bed Trucks (4x2) - (8 Nos) 5) Water Bowsers (15,000L Capacity) - (6 Nos) 6) Electric Fork Lifter - (6 Nos) PK-PDMA-SINDH-135060- GO-RFQ / Safety Equipment Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Canceled 2019-09-28 2019-11-23 2020-05-21 for PDMA office and Climate Risk Management Quotations Envelope Warehouses PK-PDMA-SINDH-135038- GO-RFB / Procurement of IT Equipment / Hardware / Software for Development of Strengthening Disaster and Single Stage - One IDA / 58880 Post Request for Bids Open - International 0.00 Canceled 2019-10-07 2019-10-12 2019-11-23 2019-12-23 2020-01-27 2020-07-25 DMIS & Establishment of Climate Risk Management Envelope Emergency Operation Centers at PDMA (HQ), Jamshoro / Hyderabad & Sukkur PK-PDMA-SINDH-154148- Pending GO-RFB / Mobile Offices / Strengthening Disaster and Single Stage - One IDA / 58880 Post Request for Bids Open - National 0.00 Implementati 2020-02-04 2020-02-09 2020-03-22 2020-04-21 2020-05-26 2020-11-22 Emergency Operation Centers Climate Risk Management Envelope on (Vehicle/s) Page 1 PK-PDMA-SINDH-154158- GO-RFB / Refurbishment of Strengthening Disaster and Single Stage - One PDMA Warehouses IDA / 58880 Post Request for Bids Open - International 0.00 Canceled 2020-01-22 2020-01-27 2020-03-09 2020-04-08 2020-05-13 2020-11-09 Climate Risk Management Envelope (Stock Piling facilities for Relief Goods; 16 Facilities) PK-PDMA-SINDH-154168- Pending GO-RFB / Relief Camp Strengthening Disaster and Single Stage - One IDA / 58880 Post Request for Bids Open - National 0.00 Implementati 2020-01-31 2020-02-05 2020-03-18 2020-04-17 2020-05-22 2020-11-18 Management Tool Kits (Water Climate Risk Management Envelope on Sanitation & Hygiene) PK-PDMA-SINDH-154171- Pending Strengthening Disaster and Single Stage - One GO-RFB / Procurement of IDA / 58880 Post Request for Bids Open - National 0.00 Implementati 2020-01-22 2020-01-27 2020-03-09 2020-04-08 2020-05-13 2020-11-09 Climate Risk Management Envelope Blankets & Mosquito Nets on PK-PDMA-SINDH-154172- Pending GO-RFB / Procurement of Strengthening Disaster and Single Stage - One IDA / 58880 Post Request for Bids Open - National 0.00 Implementati 2020-02-17 2020-02-22 2020-04-04 2020-05-04 2020-06-08 2020-12-05 High Frequency Wireless Climate Risk Management Envelope on Equipment PK-PDMA-SINDH-154176- Pending GO-RFQ / Procurement of Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2020-01-27 2020-03-23 2020-09-19 Tents for Hospitals, Schools & Climate Risk Management Quotations Envelope on Washrooms PK-PDMA-SINDH-154178- Pending GO-RFQ / Procurement of Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2020-01-27 2020-03-23 2020-09-19 Kitchen Utensils for Relief Climate Risk Management Quotations Envelope on Camps PK-PDMA-SINDH-154179- Pending GO-RFQ / Flood Response & Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2020-02-01 2020-03-28 2020-09-24 Rescue Kits (Rescue Boats, Climate Risk Management Quotations Envelope on Jackets, etc.) PK-PDMA-SINDH-154182- GO-RFQ / Search & Rescue Pending Strengthening Disaster and Request for Single Stage - One Electrical Tools (Searchlights, IDA / 58880 Post Open - National 0.00 Implementati 2020-02-01 2020-03-28 2020-09-24 Climate Risk Management Quotations Envelope communication gadgets, etc) on for targeted communities PK-PDMA-SINDH-154185- Pending GO-RFQ / Procurement of Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2020-02-01 2020-03-28 2020-09-24 Medical Equipment & First Aid Climate Risk Management Quotations Envelope on Kits PK-PDMA-SINDH-154187- Pending GO-RFQ / Communities' Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2020-02-01 2020-03-28 2020-09-24 Personal Safety Equipment Climate Risk Management Quotations Envelope on (Vests, Boots, etc) PK-PDMA-SINDH-154188- GO-RFQ / Safety Equipment Pending for PEOC / PDMA / Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2020-01-27 2020-03-23 2020-09-19 Warehouses Climate Risk Management Quotations Envelope on (Fire alarms, Fire extinguishers, CCTVs, etc.) PK-PDMA-SINDH-154190- Pending GO-RFQ / Procurement of Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2020-02-01 2020-03-28 2020-09-24 Cellular Data Bundles for Early Climate Risk Management Quotations Envelope on Warning SMSs & Robo Calls PK-PDMA-SINDH-155071- GO-RFB / Refurbishment of Strengthening Disaster and Single Stage - One PDMA Warehouses(Stock IDA / 58880 Post Request for Bids Open - National 0.00 Canceled 2020-01-23 2020-01-28 2020-03-10 2020-04-09 2020-05-14 2020-11-10 Climate Risk Management Envelope Piling Facilities) at Jamshoro & Sukkur PK-PDMA-SINDH-155085- GO-RFB / Procurement of IT Equipment / Hardware / Pending Software for Development of Strengthening Disaster and Single Stage - One IDA / 58880 Post Request for Bids Open - National 0.00 Implementati 2020-01-27 2020-02-01 2020-03-14 2020-04-13 2020-05-18 2020-11-14 DMIS & Establishment of Climate Risk Management Envelope on Emergency Operation Centers at PDMA (HQ), Jamshoro / Hyderabad & Sukkur PK-PDMA-SINDH-165628- Strengthening Disaster and GO-DIR / Tyvek Suits, Caps & IDA / 58880 Post Direct Selection Direct 11,364.83 Signed 2020-03-21 2020-03-18 2020-03-21 2020-03-20 2020-03-22 2020-04-04 2020-03-29 Climate Risk Management Shoe Covers PK-PDMA-SINDH-165636- Pending Strengthening Disaster and GO-DIR / Masks and Safety IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2020-03-21 2020-03-21 2020-03-22 2020-03-29 Climate Risk Management Goggles on Under PK-PDMA-SINDH-165787- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2020-03-23 2020-03-18 2020-03-23 2020-05-04 2020-03-23 2020-04-23 GO-DIR / Surgical Masks Climate Risk Management on PK-PDMA-SINDH-165793- Strengthening Disaster and GO-DIR / N-70 Masks & IDA / 58880 Post Direct Selection Direct 92,693.29 Signed 2020-03-23 2020-03-23 2020-03-23 2020-03-23 2020-03-23 2020-03-23 2020-04-20 Climate Risk Management Safety Googles PK-PDMA-SINDH-165850- Strengthening Disaster and GO-DIR / PPE, CERT Jackets, IDA / 58880 Post Direct Selection Direct 94,156.08 Signed 2020-03-23 2020-03-18 2020-03-24 2020-03-20 2020-03-24 2020-03-23 2020-04-03 Climate Risk Management Body Bags PK-PDMA-SINDH-166230- Under Strengthening Disaster and GO-DIR / Electro-Medical IDA / 58880 Post Direct Selection Direct 1,636,578.94 Implementati 2020-03-25 2020-03-18 2020-03-25 2020-03-20 2020-03-25 2020-06-25 Climate Risk Management Equipment on PK-PDMA-SINDH-167598- GO-DIR / ICU Equipment and Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 89,712.90 Signed 2020-04-04 2020-03-18 2020-04-04 2020-03-20 2020-04-04 2020-04-04 2020-05-04 COVID-19 Testing Machines Climate Risk Management and Kits PK-PDMA-SINDH-169908- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 27,632.23 Signed 2020-04-22 2020-04-02 2020-04-23 2020-04-23 2020-04-24 2020-04-23 2020-05-10 GO-DIR / Hand Sanitizers Climate Risk Management Page 2 PK-PDMA-SINDH-172324- GO-DIR / Syringe & Infusion Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 460,552.19 Signed 2020-05-06 2020-03-18 2020-05-06 2020-05-04 2020-05-06 2020-05-09 2020-06-30 Pumps, Defibrillator, PCR Climate Risk Management Machine & Kits PK-PDMA-SINDH-172326- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 74,479.78 Signed 2020-05-06 2020-03-18 2020-05-07 2020-05-04 2020-05-07 2020-05-09 2020-05-26 GO-DIR / Diesel Generators Climate Risk Management PK-PDMA-SINDH-177511- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 2,773,861.41 Signed 2020-06-03 2020-03-18 2020-06-03 2020-03-20 2020-06-03 2020-06-03 2020-09-30 GO-DIR / ICU Ventilators Climate Risk Management PK-PDMA-SINDH-178360- Strengthening Disaster and GO-DIR / PCR COVID-19 IDA / 58880 Post Direct Selection Direct 1,448,197.71 Signed 2020-06-09 2020-10-07 2020-06-09 2020-06-11 2020-06-09 2020-06-13 2020-06-12 Climate Risk Management Testing Kits PK-PDMA-SINDH-178383- Strengthening Disaster and Request for Single Stage - One GO-RFQ / Portable IDA / 58880 Post Open - National 10,268.76 Signed 2020-06-10 2020-06-12 2020-06-14 2020-06-14 Climate Risk Management Quotations Envelope Washrooms & Toilets PK-PDMA-SINDH-178391- GO-RFQ / IT Related Pending Strengthening Disaster and Request for Single Stage - One Equipment (Laptop, Printers, IDA / 58880 Post Open - National 0.00 Implementati 2020-06-09 2020-06-14 2020-06-18 Climate Risk Management Quotations Envelope Scanners etc) for SRP & PDMA on Staff PK-PDMA-SINDH-178395- Pending GO-RFQ / Establishment of Strengthening Disaster and Request for Single Stage - One IDA / 58880 Post Open - National 0.00 Implementati 2020-06-09 2020-06-14 2020-06-18 PDMA Command & Control Climate Risk Management Quotations Envelope on Center PK-PDMA-SINDH-180164- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 62,631.71 Signed 2020-06-15 2020-03-18 2020-06-16 2020-06-11 2020-06-19 2020-06-17 2020-07-19 GO-DIR / KN-95 Masks Climate Risk Management PK-PDMA-SINDH-185578- GO-RFB / Refurbishment of Pending Strengthening Disaster and Single Stage - One PDMA Warehouses (Stock IDA / 58880 Post Request for Bids Open - National 0.00 Implementati 2020-07-28 2020-08-09 2020-09-20 2020-10-20 2020-11-24 2021-05-23 Climate Risk Management Envelope Piling facilities for Relief on Goods; 16 Facilities) PK-PDMA-SINDH-227432- Pending Strengthening Disaster and Request for Single Stage - One GO-RFQ / Fire Alarm System IDA / 58880 Post Open - National 0.00 Implementati 2021-05-01 2021-05-20 2021-06-19 Climate Risk Management Quotations Envelope for PDMA Warehouses on PK-PDMA-SINDH-231374- Pending GO-DIR / ROCHE COBAS PCR Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-25 2021-04-30 2021-06-04 2021-12-01 Machine and COVID Testing Climate Risk Management on Kits PK-PDMA-SINDH-231390- Pending Strengthening Disaster and Request for Single Stage - One GO-RFQ / Water Filtration IDA / 67940 Post Open - National 0.00 Implementati 2021-05-02 2021-06-27 2021-12-24 Climate Risk Management Quotations Envelope Solution on Pending PK-PDMA-SINDH-231416- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-26 2021-05-01 2021-06-05 2021-12-02 GO-DIR / Surgical Masks Climate Risk Management on PK-PDMA-SINDH-231417- Pending Strengthening Disaster and GO-DIR / Procurement of IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-26 2021-05-01 2021-06-05 2021-12-02 Climate Risk Management Surgical Masks on Pending PK-PDMA-SINDH-231418- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-26 2021-05-01 2021-06-05 2021-12-02 GO-DIR / Surgical Masks Climate Risk Management on Pending PK-PDMA-SINDH-231420- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-26 2021-05-01 2021-06-05 2021-12-02 GO-DIR / Surgical Masks Climate Risk Management on Pending PK-PDMA-SINDH-231421- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-26 2021-05-01 2021-06-05 2021-12-02 GO-DIR / Mobile X-Ray Units Climate Risk Management on PK-PDMA-SINDH-231422- Pending Strengthening Disaster and GO-DIR / Blood Gas Analyzer IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-26 2021-05-01 2021-06-05 2021-12-02 Climate Risk Management Kits on Pending PK-PDMA-SINDH-231423- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-26 2021-05-01 2021-06-05 2021-12-02 GO-DIR / Patient Monitors Climate Risk Management on Pending PK-PDMA-SINDH-231424- Strengthening Disaster and IDA / 58880 Post Direct Selection Direct 0.00 Implementati 2021-04-26 2021-05-01 2021-06-05 2021-12-02 GO-DIR / ICU Ventilators Climate Risk Management on Pending PK-PDMA-SINDH-233216- Strengthening Disaster and Request for Single Stage - One IDA / 67940 Post Open - National 0.00 Implementati 2021-05-12 2021-07-07 2022-01-03 GO-RFQ / Mosquito Nets Climate Risk Management Quotations Envelope on PK-PDMA-SINDH-233217- Pending GO-RFQ / Installation of Strengthening Disaster and Request for Single Stage - One IDA / 67940 Post Open - National 0.00 Implementati 2021-05-12 2021-07-07 2022-01-03 Security Cameras at PDMA Climate Risk Management Quotations Envelope on Warehouses at Sukkur PK-PDMA-SINDH-233218- Pending Strengthening Disaster and Single Stage - One GO-RFB / Procurement of IDA / 67940 Post Request for Bids Open - National 0.00 Implementati 2021-05-06 2021-05-11 2021-06-22 2021-07-22 2021-08-26 2022-02-22 Climate Risk Management Envelope Dewatering Pumps on Pending PK-PDMA-SINDH-231384- Strengthening Disaster and Request for Single Stage - One IDA / 67940 Post Open - National 0.00 Implementati 2021-05-01 2021-06-17 2021-08-16 GO-RFQ / Center Pole Tents Climate Risk Management Quotations Envelope on Pending PK-PDMA-SINDH-231385- Strengthening Disaster and Request for Single Stage - One IDA / 67940 Post Open - National 0.00 Implementati 2021-05-01 2021-07-01 2021-08-30 GO-RFQ / Generators Climate Risk Management Quotations Envelope on Page 3 PK-PDMA-SINDH-233220- GO-RFB / Procurement of Pending Strengthening Disaster and Single Stage - One Sandwich Panels for PDMA IDA / 67940 Post Request for Bids Open - National 0.00 Implementati 2021-05-06 2021-05-11 2021-06-22 2021-07-22 2021-08-17 2021-11-15 Climate Risk Management Envelope Warehouses at Jamshoro & on Sukkur PK-PDMA-SINDH-236157- Under Strengthening Disaster and GO-DIR / Procurement of IDA / 67940 Prior Direct Selection Direct 0.00 Implementati 2021-05-25 2021-05-27 2021-06-03 2021-11-30 Climate Risk Management Ambulances on PK-PDMA-SINDH-236226- Under GO-DIR / Procurement of Strengthening Disaster and IDA / 67940 Post Direct Selection Direct 0.00 Implementati 2021-05-25 2021-06-11 2021-05-26 2021-06-02 2021-08-01 Medical Equipment for COVID- Climate Risk Management on 19 PK-PDMA-SINDH-236228- Under GO-DIR / Emergency Strengthening Disaster and IDA / 67940 Post Direct Selection Direct 0.00 Implementati 2021-05-25 2021-06-11 2021-05-26 2021-06-04 2021-08-03 Response Medical & Recuse Climate Risk Management on Supplies PK-PDMA-SINDH-236230- Under Strengthening Disaster and GO-DIR / Procurement of IDA / 67940 Post Direct Selection Direct 0.00 Implementati 2021-05-25 2021-06-11 2021-05-26 2021-06-04 2021-12-01 Climate Risk Management Mortuaries Equipment on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PDMA-SINDH-172831- Strengthening Disaster and NC-DIR / The hiring of Quality IDA / 58880 Post Direct Selection Direct 9,635.65 Signed 2020-05-08 2020-03-18 2020-05-09 2020-05-01 2020-05-09 2020-05-18 2020-11-05 Climate Risk Management Assurance Firm PK-PDMA-SINDH-234778- Pending NC-RFQ / Cellular Data Strengthening Disaster and Request for Single Stage - One IDA / 67940 Post Open - National 0.00 Implementati 2021-05-22 2021-07-17 2022-07-17 Bundles (SMSs) for Early Climate Risk Management Quotations Envelope on Warning System CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PDMA-SINDH-2813-CS- Consultant Strengthening Disaster and CQS / Capacity Assessment of IDA / 58880 Post Qualification Open - National 123,409.91 Completed 2016-11-17 2017-01-27 2016-12-08 2017-01-21 2017-04-04 2017-02-20 2017-05-01 2017-03-27 2017-05-05 2017-09-23 2019-05-30 Climate Risk Management PDMA Sindh and DDMAs Selection PK-PDMA-SINDH-2814-CS- Consultant CQS / Disaster Risk Strengthening Disaster and Pending IDA / 58880 Post Qualification Open - National 0.00 2016-11-17 2016-12-08 2017-01-21 2017-02-20 2017-03-27 2017-09-23 Management Plan and other Climate Risk Management Implementation Selection analytic Work PK-PDMA-SINDH-107857-CS- Consultant CQS / Community Based Strengthening Disaster and IDA / 58880 Post Qualification Open - National 486,616.76 Signed 2019-03-29 2019-04-11 2019-04-19 2019-06-02 2019-05-30 2019-07-02 2019-06-12 2019-08-06 2019-06-18 2020-02-02 Disaster Risk Management Climate Risk Management Selection Program PK-PDMA-SINDH-107858-CS- Consultant CQS / Capacity Building & Strengthening Disaster and IDA / 58880 Post Qualification Open - National 476,437.95 Signed 2019-03-29 2019-04-05 2019-04-19 2019-04-05 2019-06-02 2019-05-20 2019-07-02 2019-06-11 2019-08-06 2019-06-28 2020-02-02 Training of PDMA, DDMAs and Climate Risk Management Selection Government Officials PK-PDMA-SINDH-135058-CS- Consultant Strengthening Disaster and CQS / Hiring of Firm for Third- IDA / 58880 Post Qualification Open - National 0.00 Canceled 2019-10-07 2019-10-28 2019-12-11 2020-01-10 2020-02-14 2020-08-12 Climate Risk Management Party Monitoring & Validation Selection PK-PDMA-SINDH-154191-CS- CQS / Support to Line Consultant Departments (P&D, Works & Strengthening Disaster and Under IDA / 58880 Post Qualification Open - National 0.00 2020-02-04 2020-02-25 2020-04-09 2020-05-09 2020-06-13 2020-12-10 Services, etc) for DRR Climate Risk Management Implementation Selection Mainstreaming in Development Planning PK-PDMA-SINDH-154193-CS- Consultant CQS / Awareness raising Strengthening Disaster and Under IDA / 58880 Post Qualification Open - National 0.00 2020-02-04 2020-02-25 2020-04-09 2020-05-09 2020-06-13 2020-12-10 campaigns for Enactment of Climate Risk Management Implementation Selection Building codes PK-PDMA-SINDH-160430-CS- CQS / Engineering Design, Consultant Strengthening Disaster and Under Supervision & Quality IDA / 58880 Post Qualification Open - National 0.00 2020-02-20 2020-02-25 2020-03-12 2020-04-25 2020-05-25 2020-06-29 2020-12-26 Climate Risk Management Implementation Assurance (EDS & QA) Selection Consultancy Service PK-PDMA-SINDH-227007-CS- CQS / Hiring of Engineering Consultant Strengthening Disaster and Pending Firm for Design & Supervision IDA / 67940 Post Qualification Open - National 0.00 2021-03-29 2021-04-19 2021-06-02 2021-07-02 2021-08-06 2023-02-02 Climate Risk Management Implementation of 3 Rescue Stations & Selection Supervision of HRF PK-PDMA-SINDH-227016-CS- Consultant Strengthening Disaster and Pending CQS / ESMP for HRF & 3 IDA / 67940 Post Qualification Open - National 0.00 2021-03-29 2021-04-12 2021-04-18 2021-04-28 2021-05-08 2021-06-27 Climate Risk Management Implementation Rescue Stations Selection PK-PDMA-SINDH-233470-CS- Consultant Strengthening Disaster and Pending CQS / Third-Party IDA / 67940 Post Qualification Open - National 0.00 2021-05-06 2021-05-27 2021-06-20 2021-06-30 2021-07-26 2024-07-30 Climate Risk Management Implementation Monitoring/Validation Selection PK-PDMA-SINDH-233472-CS- Consultant CQS / Feasibility Study for Strengthening Disaster and Pending IDA / 67940 Post Qualification Open - National 0.00 2021-05-06 2021-05-27 2021-06-20 2021-06-25 2021-07-21 2022-03-18 Establishment of Rescue Climate Risk Management Implementation Selection Stations Page 4 PK-PDMA-SINDH-237686-CS- QCBS / PDMA Online Learning Academy & Disaster Strengthening Disaster and Quality And Cost- Under IDA / 67940 Post Open - National 0.00 2021-06-10 2021-06-07 2021-07-01 2021-08-14 2021-09-11 2021-10-11 2021-11-15 2021-12-20 2023-12-20 Management Knowledge Climate Risk Management Based Selection Implementation Centre (PDMAS - DMKC) PK-PDMA-SINDH-237687-CS- Consultant Strengthening Disaster and Under CQS / Industrial Hazards Risk IDA / 67940 Post Qualification Open - National 0.00 2021-06-10 2021-06-07 2021-07-01 2021-07-25 2021-08-04 2021-08-30 2022-06-26 Climate Risk Management Implementation Assessment Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PDMA-SINDH-2806-CS- Individual Strengthening Disaster and INDV / Financial Management IDA / 58880 Prior Consultant Open 2,148.36 Signed 2016-11-11 2016-11-17 2016-12-30 2017-03-24 2017-01-20 2017-04-11 2017-02-24 2017-05-02 2017-08-23 Climate Risk Management Specialist Selection PK-PDMA-SINDH-2807-CS- Individual Strengthening Disaster and INDV / Procurement and IDA / 58880 Prior Consultant Open 2,849.41 Terminated 2016-11-11 2017-04-03 2016-12-30 2017-02-25 2017-01-20 2017-04-26 2017-02-24 2017-05-02 2017-08-23 Climate Risk Management Contract Specialist Selection PK-PDMA-SINDH-2809-CS- Individual Strengthening Disaster and INDV / Disaster Management IDA / 58880 Post Consultant Open 1,756.72 Terminated 2016-11-10 2016-12-30 2016-12-29 2017-02-26 2017-01-19 2017-02-23 2017-05-02 2017-08-22 Climate Risk Management Specialist Selection PK-PDMA-SINDH-2811-CS- Individual Strengthening Disaster and INDV / fiscal Risk Analysis IDA / 58880 Post Consultant Open 0.00 Canceled 2016-11-10 2016-12-30 2016-12-29 2017-01-19 2017-02-23 2017-08-22 Climate Risk Management Expert Selection PK-PDMA-SINDH-2808-CS- Individual Strengthening Disaster and INDV / Risk Assessment IDA / 58880 Post Consultant Open 0.00 Canceled 2016-11-09 2016-11-23 2016-12-28 2017-01-18 2017-02-22 2017-08-21 Climate Risk Management Expert Selection PK-PDMA-SINDH-21508-CS- Individual INDV / Procurement & Strengthening Disaster and IDA / 58880 Prior Consultant Open 0.00 Canceled 2017-07-23 2017-09-15 2017-09-10 2017-10-01 2017-11-05 2018-05-04 Contract Management Climate Risk Management Selection Specialist PK-PDMA-SINDH-107053-CS- Individual INDV / Procurement & Strengthening Disaster and IDA / 58880 Post Consultant Open 2,134.09 Signed 2019-03-26 2019-03-26 2019-02-18 2019-03-26 2019-03-18 2019-03-26 2019-03-18 2020-03-17 Contract Management Climate Risk Management Selection Specialist PK-PDMA-SINDH-107861-CS- Individual INDV / Community Based Strengthening Disaster and IDA / 58880 Post Consultant Open 23,813.95 Signed 2019-03-29 2019-04-12 2019-05-03 2019-06-11 2019-05-24 2019-07-17 2019-06-28 2019-07-26 2020-06-26 Disaster Risk Management Climate Risk Management Selection Expert PK-PDMA-SINDH-110766-CS- Individual Strengthening Disaster and INDV / Individual Consultant, IDA / 58880 Post Consultant Open 28,287.82 Signed 2019-04-16 2019-04-18 2019-06-04 2019-06-11 2019-06-25 2019-07-17 2019-07-30 2019-07-18 2022-06-30 Climate Risk Management Risk Assessment Expert Selection PK-PDMA-SINDH-110771-CS- Strengthening Disaster and CDS / MHVRA for Districts of IDA / 58880 Prior Direct Selection Direct 1,227,906.90 Signed 2019-04-16 2019-04-17 2019-04-21 2019-04-17 2019-06-25 2019-06-27 2019-12-22 Climate Risk Management Sindh PK-PDMA-SINDH-111280-CS- Individual Strengthening Disaster and Under INDV / Institutional IDA / 58880 Post Consultant Open 0.00 2019-04-19 2019-04-23 2019-05-19 2019-06-09 2019-07-14 2020-07-12 Climate Risk Management Implementation Development Specialist Selection PK-PDMA-SINDH-160438-CS- Individual INDV / Procurement & Strengthening Disaster and Under IDA / 58880 Post Consultant Open 0.00 2020-02-20 2020-02-26 2020-04-09 2020-04-30 2020-06-04 2021-04-01 Contract Management Climate Risk Management Implementation Selection Specialist PK-PDMA-SINDH-165626-CS- CDS / Development of Mobile Strengthening Disaster and Under IDA / 58880 Post Direct Selection Direct 0.00 2020-03-21 2020-03-25 2020-03-23 2020-03-25 2020-04-04 App & Control Center for Climate Risk Management Implementation COVID-19 Individual PK-PDMA-SINDH-225941-CS- Strengthening Disaster and Pending IDA / 67940 Post Consultant Open 0.00 2021-03-25 2021-04-20 2021-04-25 2021-05-05 2024-08-17 INDV / Procurement Officer Climate Risk Management Implementation Selection Individual PK-PDMA-SINDH-225931-CS- Strengthening Disaster and Pending IDA / 67940 Post Consultant Open 0.00 2021-03-25 2021-04-20 2021-04-25 2021-05-05 2024-08-17 INDV / Rescue 1122 Specialist Climate Risk Management Implementation Selection PK-PDMA-SINDH-184293-CS- Individual Strengthening Disaster and Pending INDV / Financial Management IDA / 67940 Post Consultant Open 0.00 2021-03-25 2021-04-11 2021-04-16 2021-04-26 2024-08-08 Climate Risk Management Implementation Specialist Selection PK-PDMA-SINDH-225936-CS- Individual Strengthening Disaster and Pending INDV / Admin & Finance IDA / 67940 Post Consultant Open 0.00 2021-03-25 2021-04-20 2021-04-25 2021-05-05 2024-08-28 Climate Risk Management Implementation Officer Selection PK-PDMA-SINDH-237426-CS- Individual Strengthening Disaster and Pending INDV / Hiring of Project IDA / 67940 Post Consultant Open 0.00 2021-06-10 2021-07-29 2021-08-19 2021-09-23 2025-01-05 Climate Risk Management Implementation Coordinator Selection Page 5 MALAWI WATERSHED SERVICES IMPROVEMENT PROJECT 18 MONTHS PROCUREMENT PLAN Project information: Malawi Watershed Services Improvement Project (MWASIP) - P167860 Project Implementation Agency: Ministry of Agriculture, Irrigation and Water Development, Malawi Date of the Procurement Plan: February 25, 2020 Period covered by this Procurement Plan: February 2020 to August 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Disposal of Public Assets Act, 2017 of the Republic of Malawi, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.4 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting 1 contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a) Procurement Approach and Prior Review Thresholds: The Procurement Arrangements as indicated in the below table will be used. The thresholds for the Bank’s prior review requirements are also provided in the table: Prior-review Thresholds for Procurement Methods Thresholds Procurem Substanti Works Goods, IT & Non-Consulting Shortlist of National ent al Services Consultants Type Risk ($`000) Works 10,000 Open Request Request Internatio for Engineerin Open Open for nal or Quotatio Open g& Nation Nationa Quotatio Consulting ICB n or internatio Constructio al or l or n or Services ($'000 National nal or ICB n NCB NCB National ($'000) Shoppin ($'000) Supervision ($'000) ($'000) Shopping g ($'000) ($'000) ($'000) Goods, IT 2,000 & Non- Consulting ≧ < ≦ ≧ < ≦ < ≦ Services Consultan 1,000 ts (Firms) Individual 300 7,000 7,000 200 1,000 1,000 100 200 300 Consultan ts 2 *These prior review thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The Ministry of Agriculture Irrigation and Water Development team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/Plan with Procurement Arrangements and Time Schedule: as per the table below: b) PROCUREMENT PLAN Works 1 2 3 4 5 6 7 8 9 Ref Contract Estimate Procurem Prequalifica Nationa Revie Expecte Expecte . (Description) d ent tion l w d bid d No. Cost Method/ (yes/no) Prefere by openin Contrac US$ Arrangem nce Bank g date t million ent (yes/no) (Prior Signatu / re Date Post) 1. Construction of 10 11,000,00 Open Post No Prior 30-Nov- 30-Mar- irrigation schemes in 0 Internation 20 21 Zomba, Machinga, al, RFB Ncheu and Neno Districts 2. Construction of 10 Small 10,050,00 Open Post No Prior 30-Nov- 24-Apr- Dams and medium size 0 Internation 20 21 multipurpose dams al, RFB 3. Construction of 8 high 7,000,000 Open Post No Post 15 Jan 15 Jun yielding boreholes and Internation 21 21 associated irrigation al, RFB facilities 4. Construction of 20 rain 5,000,000 Open Post No Post 10 Feb 10 Jun water harvesting National, 21 21 structures RFB Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimate Procurem Prequalifica Nationa Revie Expecte Expecte No. (Description) d ent tion l w d bid d Cost Method/ (yes/no) Prefere by openin Contrac US$ Arrangem nce Bank g date t million ent (yes/no) (Prior Signatu / re Date Post) 3 1. Procurement of 12 840,000 Open Post No Post 23-Apr- 15-Jun- motor vehicles National, 20 20 RFB 2. Procurement of 10 80,000 Limited, Post No Post 24-Mar- 28-Apr- motor cycles RFQ 20 20 3. Procurement of office 204,300 Open Post No Post 9-Apr-20 7-May- furniture (Desks, Chairs, National, 20 Filling Cabinets, RFB conference furniture, book shelves 4. Procurement of ICT 100,150 Open Post No Post 10-May- 8 Juy-20 equipment (20 Laptops, National, 20 and 5 supporting tools) RFB 5. Procurement of 20 15,600 Limited, Post No Post 26-Sep- 15-Dec- Tablets RFQ 20 20 6. Supply and of 1 Weather 2,000,00 Open, Post No Prior 6 Jun-20 29-Aug- radar and Associated 0 Internation 20 Accessories al, RFB 7. Procurement of 100,000 Open Post No Post 8-Mar-20 1-Jul-20 Financial Accounting National, Software maintenance RFB and Technical Support and user training Consultancy Services 1 2 3 4 5 6 7 Ref. Description of Assignment Estimat Selection Revie Expected Expected No. ed Method/ w date of Contract Cost Arrangeme by proposal Signature US$ nt Bank submissi Date (Prior / on Post) 1. Consulting Services to carry out 100,000 Open Post 12-Apr-20 10-Aug-20 Project Baseline Studies. National, CQS 2. Consulting Services for design, 1,000,00 Open Prior 12-Apr-20 10-Aug-20 design review, Construction 0 Internationa Supervision of 10 irrigation l, QCBS schemes and Water User Association (WUA) establishment 3. Consulting Services to update 500,000 Open Post 12-Apr- 11-Sep-20 ESIA and ESMP’s, and RAP Internationa 2020 preparation for 10 Irrigation l, QCBS Schemes 4. Consultancy Services to conduct 1,000,00 Open Prior 5-Apr-20 25-Jul-20 feasibility study and detailed 0 Internationa designs of 10 small and medium l, QCBS size multipurpose dams, including establishment of 4 1 2 3 4 5 6 7 Ref. Description of Assignment Estimat Selection Revie Expected Expected No. ed Method/ w date of Contract Cost Arrangeme by proposal Signature US$ nt Bank submissi Date (Prior / on community-based O&M Post) institutional arrangements 5. Consulting services for 500,000 Open Post 12-Apr- 11-Sep-20 Preparation of the ESIA and RAP Internationa 2020 for the Small and medium l QCBS Dams 6. Consulting services for detailed 400,000 Open Post 12-Apr- 11-Sep-20 design and supervision of 8 Internationa 2020 high yielding boreholes and l QCBS associated conveyance infrastructure 7. Consultancy Services for 400,000 Open Post 5-Apr-20 10-Aug-20 detailed design and Internationa Construction supervision of l, QCBS water harvesting structures 8. Consulting services for 200,000 Open Post 15-Aug-20 10-Dez-20 preparation of ESMPs and RAPs Internationa for high yielding boreholes and l QCBS water harvesting structures 9. Consulting services for (i) 1,000,00 Open Prior 15-Apr- 30-Sep-20 preparation and update 0 Internationa 2020 (including digitization) of l QCBS catchment management plans and micro-catchment plans (VLAPs) in the middle Shire River basin (SRBMP catchments in Blantyre, Neno, Ntcheu, Machinga, Zomba districts and (ii) delineation of priority hotspot catchments in the upper Shire (Balaka, Machinga, Zomba and Mangochi) and preparation catchment management plans and micro- catchment plans (VLAPs) 10. Consulting services for 1,000,00 Open Prior 15-Apr- 30-Sep- delineation of priority hotspot 00 Internationa 2020 2020 catchments in Linthipe, Bua, l QCBS and Dwangwa river basins, and preparation catchment management plans and micro- catchment plans (VLAPs) 11. Consulting services for social 1,000,00 Open Prior 15-Jul- 30-Nov- marketing 0 Internationa 2020 2020 l QCBS 12. Consulting services for design 800,000 Open Prior 15-Sep- 30-Jan-2020 of the PWS pilot for sediment Internationa 2020 reduction l QCBS 5 1 2 3 4 5 6 7 Ref. Description of Assignment Estimat Selection Revie Expected Expected No. ed Method/ w date of Contract Cost Arrangeme by proposal Signature US$ nt Bank submissi Date (Prior / on 13. PPP transaction advisory 800,000 Open Post) Prior 15-Apr- 30-Sep- services for development of Internationa 2020 2020 hydrological and climate l QCBS products and services (including market assessment) 14. Consulting services for 2,500,00 Open Prior 15-Sep- 30-Jan-2020 development and 0 Internationa 2020 operationalization of a l QCBS biophysical and ecological monitoring system (including capacity building) 15. Consulting services for update 1,000,00 Open Prior 15-Apr- 30-Sep- of agro-ecological zones, 0 Internationa 2020 2020 updated national forest cover l QCBS maps, land use and land cover maps (including map production) 16. Consulting services for 300,000 Open Post 15-Apr- 30-Sep- preparation of institutional Internationa 2020 2020 development plans for key l QCBS watershed institutions 17. Consulting services for 400,000 Open Prior 15-Apr- 30-Sep- independent verification of Internationa 2020 2020 performance of key watershed l QCBS institutions 18. Hiring of Financial Management 392,000 Open Prior 18-April- 8-Nov-20 Specialist National, 20 INDV 19. Hiring of Assistant Financial 157,000 Open Post 18-April- 8-Nov-20 Management Specialist National, 20 INDV 20. Hiring of Procurement 392,000 Open Prior 18-April- 8-Nov-20 Specialist National, 20 INDV 21. Hiring of Project Management 392,000 Open Prior 18-April- 8-Nov-20 Specialist National, 20 INDV 22. Hiring of Environmental 392,000 Open Prior 18-April- 8-Nov-20 Safeguards Specialist National, 20 INDV 23. Hiring of Social Safeguards 392,000. Open Prior 18-April- 8-Nov-20 Specialist 00 National, 20 INDV 24. Hiring of Monitoring and 392,000 Open Prior 18-April- 8-Nov-20 Evaluation Specialist National, 20 INDV 6 1 2 3 4 5 6 7 Ref. Description of Assignment Estimat Selection Revie Expected Expected No. ed Method/ w date of Contract Cost Arrangeme by proposal Signature US$ nt Bank submissi Date (Prior / on 25. Hire Technical Assistant in Land 216,400 Open Post) Post 18-Aug-20 10-Mar-21 Administration National, INDV RFB – Request for Bids; RFQ – Request for Quotations; CQS - Consultant’s Qualification Based Selection; QCBS - Quality and Cost Based Selection and; INDV - Individual Consultant Selection. 7 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 8 in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 9 Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 10 PROCUREMENT Malawi : Malawi Watershed Services Improvement Project PLAN General Information Country: Malawi Bank’s Approval Date of the Original Procurement Plan: 2020-08-28 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167860 GPN Date: 2020-08-28 Project Name: Malawi Watershed Services Improvement Project Loan / Credit No: IDA / D5860, IDA / 65790 M Executing Agency(ies): inistry of Agriculture, Irrigation and Water Development WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MW-MOAIWD-197898-CW- RFQ / Rehabilitation of Malawi Technical and Project Request for Single Stage - One 2021-07- IDA / 65790 Post Limited 200,000.00 350,823.54 Signed 2020-11-21 2020-12-14 2021-01-05 2021-04-01 Watershed Services Management Support Quotations Envelope 04 Improvement Project (MWASIP) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-MOAIWD-192192-GO- Technical and Project Single Stage - One RFB / Procurement of 12x 4x4 IDA / 65790 Post Request for Bids Open - National 840,000.00 722,254.69 Signed 2020-09-30 2020-10-02 2020-10-05 2020-10-06 2020-11-04 2020-11-04 2020-11-24 2020-11-11 2020-12-23 2021-04-01 2021-02-21 Management Support Envelope Double Cable Vehicles MW-MOAIWD-193096-GO- RFB / Supply and Delivery of Under Office Furniture including Technical and Project Single Stage - One IDA / 65790 Post Request for Bids Open - National 204,300.00 0.00 Implementati 2020-09-30 2020-10-14 2020-10-10 2020-12-11 2020-11-09 2020-11-24 2020-11-24 2020-12-22 2021-02-20 Desks, Executive Chairs, Management Support Envelope on Filling Cabinets, Conference Furniture and Book shelves MW-MOAIWD-196695-GO- Under Technical and Project Single Stage - One RFB / Procurement of ICT IDA / 65790 Post Request for Bids Open - National 100,150.00 0.00 Implementati 2020-10-08 2020-10-07 2020-10-13 2020-10-16 2020-11-12 2020-11-20 2020-12-12 2021-02-12 2020-12-31 2021-01-30 Management Support Envelope Equipment on MW-MOAIWD-231879-GO- Pending Technical and Project Request for Single Stage - One RFQ / Supply and Delivery of IDA / 65790 Post Limited 80,000.00 0.00 Implementati 2021-05-29 2021-07-06 2021-08-17 Management Support Quotations Envelope 10 Motorcycles on MW-MOAIWD-231887-GO- Pending Scaling up Landscape Request for Single Stage - One RFQ / Supply and Delivery of IDA / 65790 Post Limited 39,200.00 0.00 Implementati 2021-05-27 2021-07-04 2021-08-03 Restoration Quotations Envelope 50 Tablets on MW-MOAIWD-237722-GO- RFQ / Supply and Delivery of ICT Equipment (1 Heavy Duty Pending Technical and Project Request for Single Stage - One Photocopier, 3 Desktops and IDA / 65790 Post Limited 53,000.00 0.00 Implementati 2021-06-12 2021-07-16 2021-08-15 Management Support Quotations Envelope 3 UPS, 3 Printers, 25 External on Hard drives, and 56 Anti- virus. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-MOAIWD-190073-CS- QCBS / Consulting services for design review, Quality And Cost- Under construction supervision of IDA / D5860 Improving Watershed Services Prior Open - International 1,000,000.00 0.00 2020-08-28 2020-09-30 2020-09-11 2020-12-03 2020-10-30 2020-12-11 2020-12-25 2021-02-05 2021-03-19 2024-01-03 Based Selection Implementation irrigation schemes and establishment of Water User's Association MW-MOAIWD-190038-CS- QCBS / Consulting services for preparation of catchment management plans and micro- catchment plans (VLAPs) in Scaling up Landscape Quality And Cost- Under IDA / D5860 Prior Open - International 1,000,000.00 0.00 2020-08-31 2020-09-30 2020-09-14 2021-02-24 2020-10-26 2020-12-07 2020-12-21 2021-01-29 2021-03-05 2023-02-23 the upper and middle Shire Restoration Based Selection Implementation River basin, including delineation of priority hotspot catchments in the upper Shire River Basin MW-MOAIWD-190055-CS- QCBS / Consulting services for development and Technical and Project Quality And Cost- Under operationalization of a IDA / D5860 Prior Open - International 2,500,000.00 0.00 2020-08-28 2020-09-29 2020-09-11 2021-02-24 2020-10-30 2020-12-11 2020-12-25 2021-02-05 2021-03-12 2025-03-11 Management Support Based Selection Implementation biophysical and ecological monitoring system (including capacity building) MW-MOAIWD-190067-CS- QCBS / Consulting services for detailed design and Quality And Cost- Under IDA / D5860 Improving Watershed Services Post Open - International 400,000.00 0.00 2020-09-04 2020-09-01 2020-09-18 2020-12-10 2020-11-06 2021-03-14 2020-12-18 2021-01-01 2021-02-12 2021-03-26 2023-03-16 supervision of 8 high yielding Based Selection Implementation boreholes and associated conveyance infractructure Page 1 MW-MOAIWD-189997-CS- QCBS / Consulting services for feasibility study, detailed design and construction supervision of small and Quality And Cost- Under IDA / D5860 Improving Watershed Services Prior Open - International 1,000,000.00 0.00 2020-09-04 2020-09-30 2020-09-18 2020-12-02 2020-11-06 2020-12-18 2021-01-01 2021-02-12 2021-03-26 2024-01-10 medium sized multipurpose Based Selection Implementation dams including establishment of community based operational and maintenance institutional arrangements MW-MOAIWD-190044-CS- QCBS / Consulting services Scaling up Landscape Quality And Cost- Under for independent verification IDA / D5860 Post Open - International 400,000.00 0.00 2020-10-12 2020-11-02 2020-10-26 2021-02-03 2020-12-14 2021-03-30 2021-01-25 2021-02-08 2021-03-03 2021-04-07 2025-04-06 Restoration Based Selection Implementation services for all performance- based grants under the project MW-MOAIWD-226189-CS- QCBS / Consultancy for Development of Intergrated Technical and Project Quality And Cost- Under IDA / 65790 Post Open - National 200,000.00 0.00 2021-04-26 2021-04-14 2021-05-17 2021-06-07 2021-06-16 2021-07-16 2021-07-31 2021-08-25 2021-09-18 2022-03-17 MRDRMP and MWASIP Management Support Based Selection Implementation Management Iformation System MW-MOAIWD-237719-CS- Consultant CQS / Consultancy Services Technical and Project Pending IDA / 65790 Post Qualification Limited 20,000.00 0.00 2021-06-21 2021-07-05 2021-07-19 2021-08-03 2021-09-02 for Development of Website Management Support Implementation Selection for MWASIP INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-MOAIWD-217448-CS- CDS / Procurement of computerized Financial Technical and Project IDA / D5860 Post Direct Selection Direct 100,000.00 91,080.00 Signed 2021-02-05 2021-01-18 2021-02-15 2021-03-19 2021-04-05 2021-03-19 2021-10-02 Management and Accounting, Management Support Procurement and Monitoring and Evaluation System MW-MOAIWD-226185-CS- INDV / Individual Consulting Individual Services” for Development of Scaling up Landscape IDA / 65790 Post Consultant Open 25,000.00 0.00 Canceled 2021-04-12 2021-03-29 2021-05-28 2021-06-11 2021-07-05 2021-11-02 Manuals for Matching Grants Restoration Selection for Enhancing Agricultural Based Livelihoods MW-MOAIWD-226631-CS- CDS / Consultancy Services Technical and Project Under IDA / 65790 Post Direct Selection Direct 300,000.00 0.00 2021-04-12 2021-03-30 2021-04-26 2021-06-03 2021-11-30 to undertake Baseline Study Management Support Implementation for MRDRMP and MWASIP MW-MOAIWD-226182-CS- INDV / Individual Consulting Individual Services for Development of Scaling up Landscape Under IDA / 65790 Post Consultant Limited 20,000.00 0.00 2021-04-12 2021-03-31 2021-04-26 2021-05-06 2021-05-30 2021-09-27 Performance Based Grants Restoration Implementation Selection Manuals for Establishment of Productive Forest MW-MOAIWD-226179-CS- Individual INDV / Consultancy Services IDA / 65790 Improving Watershed Services Post Consultant 25,000.00 0.00 Under Review 2021-04-19 2021-04-23 2021-05-03 2021-05-08 2021-06-01 2021-10-29 for Development of Climate Selection Change and Meteological Bill MW-MOAIWD-227202-CS- Individual Under INDV / Consultancy for Social IDA / 65790 Improving Watershed Services Post Consultant Open 172,500.00 0.00 2021-04-06 2021-04-20 2021-05-22 2021-06-01 2021-06-25 2022-06-25 Implementation Marketing Campaign Selection MW-MOAIWD-227965-CS- INDV / Individual Consulting Individual Services” for Development of Under IDA / 65790 Improving Watershed Services Post Consultant Limited 25,000.00 0.00 2021-04-06 2021-04-06 2021-04-11 2021-04-26 2021-05-04 2021-10-01 Manuals for Matching Grants Implementation Selection for Enhancing Agricultural Based Livelihoods MW-MOAIWD-231892-CS- Individual INDV / Individual Consulting Scaling up Landscape IDA / 65790 Post Consultant Open 22,000.00 0.00 Under Review 2021-05-31 2021-05-27 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Services for Land Restoration Selection Administration Specialist MW-MOAIWD-231894-CS- INDV / Recruitment of Individual Individual Consultants as Technical and Project IDA / 65790 Post Consultant Open 151,000.00 0.00 Under Review 2021-05-26 2021-05-27 2021-07-14 2021-08-04 2021-09-08 2022-03-07 District Project Accountant (7 Management Support Selection Project Accountants for 7 Districts) MW-MOAIWD-237724-CS- INDV / Recruitment of Individual Technical and Project Under Individual Consultant as IDA / 65790 Prior Consultant Open 110,000.00 0.00 2021-06-15 2021-06-17 2021-07-27 2021-08-03 2021-08-23 2022-08-23 Management Support Implementation Assistant Procurement Selection Specialist MW-MOAIWD-237729-CS- Individual INDV / Recruitment of Technical and Project Under IDA / 65790 Prior Consultant Open 150,500.00 0.00 2021-06-15 2021-06-17 2021-07-27 2021-08-03 2021-08-23 2022-08-23 Individual Consultant as Management Support Implementation Selection Procurement Specialist Page 2 Procurement Plan I. General 1. Project Information Country : Nepal Borrower : Government of Nepal Project Name : Strengthening Systems for Social Protection Loan Credit No. : Credit 5912-IN 2. Bank’s Approval Date of the Procurement Plan : September 23, 2016 3. Date of General Procurement Notice : 4. Period Covered by this procurement plan : 18 months : September 1, 2017-March 31, 2018 II. Goods, Works, and Non-Consulting Services The following methods may be used for those contracts as specified in the Procurement Plan. For procurement of goods and non-consulting services: (a) International Competitive Bidding; (b) National Competitive Bidding in accordance with the provisions of the Public Procurement Act (and regulations made thereunder), subject to the additional provisions set out in the legal agreement; (c) Limited International Bidding; (d) Shopping; (e) procurement under Framework Agreements in accordance with procedures which have been found acceptable to the Association; (f) Direct Contracting; and (g) Procurement from United Nations agencies; (h) Well-established Private Sector Procurement Methods or Commercial Practices which have been found acceptable to the Association; and (i) community participation procedures acceptable to the Association. These thresholds will be modified as required Thresholds for Method of Procurement for procurement of goods, works and non- consulting services Procurement of Goods, Information technology and non consultancy services: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 1 million Limited Competitive Bidding (LIB) Must meet the requirements as per Para 3.2 of the Procurement Guidelines, and with prior agreement in PP with the Bank National Competitive Bidding (NCB) > USD 25,000 and up to USD 1 million. Any procurement/selection above this threshold is to follow NCB with NCB conditions Shopping Up to USD 25,000 (NPR 2.5 Million) Direct Contract Must meet the requirements as per Para 3.7 of the Procurement Guidelines, and with prior agreement in PP with the Bank Framework Agreement Must meet the requirements as per Para 3.6 of the Procurement Guidelines, and with prior agreement in PP with the Bank Prior Review Thresholds: The following would be subject to Prior review of the Bank regardless of the Method of selection: (a) Goods: All procurements estimated to cost more than USD 2 million; and (b) IT and Non-Consulting Services: All procurements estimated to cost more than USD 2 million (c) Direct Contracting : All direct contracts over US $50,000 In addition, the justification for all contracts to be procured on a Limited International Bidding and Direct Contracting basis will be subject to prior review. The Prior Review Thresholds will be reviewed and updated during the implementation of the project, and modified based on the risk assessment. 1. In the case of contracts subject to prior review, Project Implementing Entity shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of goods, non-consulting services or consulting services, other significant changes to the terms and conditions of such that the contract; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; or (d) the proposed termination of the contract.. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable 3. Domestic Preference: Not Applicable 4. Reference to Operations Manual The operation manual for the project has been approved by the Bank. SBDs agreed between the Project and Bank will be used for all goods, and non- consultancy procurements. 5. Any Other Special Procurement Arrangements The National bidding method for procurement and goods and works according to the above value thresholds will be conducted in accordance with paragraphs 3.3 and 3.4 of the Bank’s Procurement Guidelines and the following provisions: (a) Model bidding documents, including contract conditions agreed with the Association (as amended from time to time), shall be used. Bidding documents shall be made available, by mail or in person, to all who are willing to pay the required fee. (b) Eligibility to participate in a procurement process for and to be awarded an Association-financed contract shall be as defined under Section I of the Procurement Guidelines. Foreign bidders shall not be precluded from bidding and no preference of any kind shall be given to national bidders. (c) Prospective bidders shall be given at least thirty (30) days from the date of publication of the invitation to bid or the date of availability of the bidding documents, whichever is later, to prepare and submit bids. There shall not be any restriction on the modality for delivery of bids. Bids may be withdrawn or modified any time before the deadline for submission of bids. Bids shall be opened in public in one place, immediately after the deadline for submission of bids. Bids received after the deadline for bid submission shall be rejected and returned to bidders unopened. (d) Qualification criteria (in case pre-qualifications were not carried out) shall be stated in the bidding documents for all contracts, irrespective of the value, and if a registration process is required, a foreign firm declared as the lowest evaluated bidder shall be given a reasonable opportunity to register, without let or hindrance. (e) Evaluation of bids shall be made in strict adherence to the criteria disclosed in the bidding documents. Contract shall be awarded to the qualified bidder whose bid has been determined: (a) to be substantially responsive to the bidding documents, and (b) to offer the lowest- evaluated cost. (f) For contracts subject to the Association's prior review, all bids shall not be rejected, the procurement process shall not be cancelled, and new bids shall not be solicited without the Association's prior concurrence. In case of re-bidding, the time for preparation and submission of bids shall be as set forth under provision (iii) of this Annex. (g) Bids shall be valid as per the period stated in the bidding documents. For contracts subject to prior review, the extension of bid validity shall not be allowed without the prior concurrence of the Association: (a) for the first - 15 - request for extension if it is longer than four (4) weeks; and (b) for all subsequent requests for extension irrespective of the period. (h) Bid and performance securities shall be in the format included in the bidding documents. The bid security shall be valid for twenty-eight days (28) beyond the original validity period of the bid, or beyond any period of extension if requested. Performance security shall be an amount of five (5) to ten (10) percent (%) of the contract price and shall not be increased merely on the basis of comparison of the contract price with the pre-bid cost estimate. (i) If a contract is terminated because of fundamental breach of contract by the contractor, the amount to be recovered from the contractor representing the employer's additional costs for completing the contract shall be provisioned as agreed with the Association in model bidding documents. (j) At the Recipient's request, the Association may agree to the Recipient's use, in whole or in part, of its electronic procurement system, provided the Association is satisfied with the adequacy of such system. (k) With respect to contracts subject to the Association's prior review, the Recipient shall obtain the Association's no objection before agreeing to: (a) a material extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services or other significant changes to the terms and conditions of the contract; (c) any variation order or amendment (except in cases of extreme urgency) which, singly or combined with all variation orders or amendments previously issued, increases the original contract amount by more than fifteen percent (15%); or (d) the proposed termination of the contract. A copy of all contract amendments shall be provided to the Association. (1) The bidding document and contract as deemed acceptable by the Association shall include provisions stating the Association's policy to sanction firms or individuals, found to have engaged in fraud and corruption as defined in the Procurement Guidelines. (m) In accordance with paragraph 1.16(e) of the Procurement Guidelines, each bidding document and contract financed out of the proceeds of the Association financing shall require that bidders, suppliers, contractors and their subcontractors, agents, personnel, consultants, service providers, or suppliers to permit the Association to inspect all accounts, records and other documents relating to the bid submission and performance of the contract and to have said accounts and records audited by auditors appointed by the Association. Acts intended to materially impede the exercise of the Association's inspection and audit rights provided for in - 16 - the Procurement Guidelines constitute an obstructive practice as defined in the Guidelines. III. Selection of Consultants The following methods may be used for those contracts as specified in the Procurement Plan for selection of consulting services : (a) Quality- and Cost- Based Selection; (b) Quality-based Selection; (c) Selection under a Fixed Budget; (d) Least-Cost Selection; (e) Selection Based on the Consultants’ Qualifications; (f) Single-source Selection of Consulting Firms; (g) Procedures set forth in paragraphs 5.2 and 5.3 of the Consultant Guidelines for the Selection of Individual Consultants; and (h) Single-source Procedures for the Selection of Individual Consultants. The thresholds applicable to these methods of procurement are indicated in the Procurement Plan. These thresholds will be modified as required. 1. Methods and Prior Review Threshold Procurement methods of procurement of Consultants' Services (Firms) Method of Procurement Thresholds for Methods Quality and Cost Based Selection (QCBS) Quality Based Selection (QBS) Must meet the requirements as per Para 3..2 to 3.4 of the Consultant Guidelines Selection based on a Fixed Budget Must meet the requirements as per (FBS) Para 3.5 of the Consultant Guidelines, Selection Based on Least Cost Basis Must meet the requirements as per (LCS) Para 3.6 of the Consultant Guidelines, Selection based on Consultant’s Estimated not to exceed USD Qualification (CQ) 300,000, and must meet the requirements as per Para 3.7 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements as per Para 3.8 to 3.11 of the Consultant Guidelines, and with prior agreement in PP with the Bank. Procurement methods for Selection of Individual Consultants (IC) Method of Procurement Thresholds for Methods Competitive Selection Must meet the requirements of Section V, Para 5.1 to 5.5 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements of Section V, Para 5.6 of the Consultant Guidelines and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Consultant Guidelines Prior Review Thresholds: (a). Consulting Firm: All procurements estimated to cost more than USD 1 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.3 million (c) Single Source Selection : All Single Source contracts over US $50,000 and single source justification Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. 1. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. The Request for Expression of Interest for consultancy services estimated to cost above USD 300,000 equivalent per contract for firms shall be advertised in UNDB online and World Bank external Website and in accordance with other provisions of Para 2.5 of the Consultant Guidelines 4. Any other Special Selection Arrangements: Not applicable I. Implementing Agency Capacity Building Activities with Time Schedule No Expected Outcome/Activity Description Estimated Date Duration During Procurement orientation/launch workshop on September- 1. 2-3 days project effectiveness October 2017 PROCUREMENT Nepal : Strengthening Systems for Social Protection and Civil Registration Project PLAN General Information Country: Nepal Bank’s Approval Date of the Original Procurement Plan: 2017-09-25 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154548 GPN Date: 2017-08-22 Project Name: Strengthening Systems for Social Protection and Civil Registration Project Loan / Credit No: IDA / 59120 D Executing Agency(ies): epartment of National ID and Civil Registration WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-DOCR-24582-GO-RFB / Component 4: Project Procurement of 4 wheel Single Stage - One IDA / 59120 Management, Monitoring and Post Request for Bids Open - National 20,482.94 Completed 2017-10-01 2018-05-15 2017-10-06 2017-11-05 2018-03-11 2017-12-05 2018-06-04 2018-01-11 2018-06-06 2018-01-14 2018-07-06 Vehicles (1 nos) for Envelope Evaluation PMU/DOCR NP-DOCR-25238-GO-RFQ / Component 4: Project Request for Single Stage - One Procurement of Motorcycle IDA / 59120 Management, Monitoring and Post Open - National 13,451.78 Completed 2018-03-25 2018-05-30 2018-03-09 2018-06-29 2018-04-09 Quotations Envelope (7nos) for PMU/DOCR Evaluation NP-DOCR-24701-GO-RFQ / Component 4: Project Request for Single Stage - One Procurement of Scooters (5 IDA / 59120 Management, Monitoring and Post Open - National 7,840.54 Completed 2018-03-25 2018-06-04 2018-03-09 2018-07-04 2018-04-09 Quotations Envelope nos) for PMU/DOCR Evaluation NP-DOCR-24579-GO-RFQ / Component 3: Institutional Request for Single Stage - One Procurement of Equipment of IDA / 59120 Post Open - National 12,083.44 Completed 2018-08-06 2018-10-18 2018-09-10 2019-01-16 2018-12-10 Strengthening Quotations Envelope photocopy machine for PMU NP-DOCR-114930-GO-RFQ / Pending Component 3: Institutional Request for Single Stage - One Procurement of FortiGate IDA / 59120 Post Open - National 0.00 Implementati 2019-09-06 2019-10-11 2019-11-10 Strengthening Quotations Envelope 100E License for VERSP MIS on NP-DOCR-115057-GO-RFQ / Pending Component 3: Institutional Request for Single Stage - One Procurement of SSL License IDA / 59120 Post Open - National 0.00 Implementati 2019-10-06 2019-11-10 2019-12-10 Strengthening Quotations Envelope Purchase/Renew for VERSP on MIS NP-DOCR-24719-GO-RFQ / Component 4: Project Request for Single Stage - One Procurement of 1 GIS License IDA / 59120 Management, Monitoring and Post Open - National 0.00 Canceled 2019-12-06 2020-02-01 2020-03-02 Quotations Envelope for PMU Evaluation NP-DOCR-73784-GO-RFQ / Component 3: Institutional Request for Single Stage - One Procurement of Solar Backup IDA / 59120 Post Open - National 0.00 Canceled 2020-01-06 2020-02-25 2020-03-26 Strengthening Quotations Envelope for PMU (Battery and Inverters) NP-DOCR-75131-GO-RFB / Procurement of Security Component 3: Institutional Single Stage - One Equipment: firewall, IDA / 59120 Post Request for Bids Open - National 0.00 Canceled 2018-09-23 2018-09-28 2018-11-09 2018-12-09 2019-01-13 2019-07-12 Strengthening Envelope application firewall, load balancer NP-DOCR-24718-GO-RFB / Supply, Delivery, Installation, configuration and support of Component 3: Institutional Single Stage - One IDA / 59120 Post Request for Bids Open - International 827,971.49 Signed 2019-10-01 2020-12-02 2019-10-06 2019-11-17 2021-01-01 2019-12-17 2021-02-08 2020-01-21 2021-03-07 2020-01-30 data center, failover system, Strengthening Envelope disaster recovery center equipments and software NP-DOCR-73812-GO-RFQ / Component 3: Institutional Request for Single Stage - One Hiring a Firm for VERSP_MIS IDA / 59120 Post Open - National 0.00 Canceled 2018-10-05 2018-11-24 2018-12-24 Strengthening Quotations Envelope User Manual Printing. NP-DOCR-73814-GO-RFQ / Hiring a Firm for VER Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2019-03-20 2019-05-09 2019-06-08 Online/Offlile Directives Strengthening Quotations Envelope Printing NP-DOCR-24714-GO-RFB / Procurement of Server and Component 3: Institutional Single Stage - One Network Equipment: Server, IDA / 59120 Post Request for Bids Open - International 0.00 Canceled 2018-09-23 2018-09-28 2018-11-12 2018-12-27 2019-02-02 2019-06-02 Strengthening Envelope Storage, Network, Fabric, Rack/Cooling/UPS NP-DOCR-73782-GO-RFQ / Procurement of Desktop Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2018-10-06 2018-11-25 2018-12-25 Computer for Project Strengthening Quotations Envelope Management Unit (PMU) NP-DOCR-114925-GO-RFQ / Component 3: Institutional Request for Single Stage - One Procurement of Projector IDA / 59120 Post Open - National 0.00 Canceled 2019-08-08 2019-09-12 2019-10-12 Strengthening Quotations Envelope (Nos. 2) for PMU. NP-DOCR-115189-GO-RFQ / Component 3: Institutional Request for Single Stage - One Procurement of LED Television IDA / 59120 Post Open - National 0.00 Canceled 2019-09-06 2019-11-01 2020-04-29 Strengthening Quotations Envelope for PMU (6 Nos.) NP-DOCR-24585-GO-RFB / Component 4: Project Procurement of Pick up Single Stage - One IDA / 59120 Management, Monitoring and Post Request for Bids Open - National 0.00 Canceled 2020-07-01 2020-07-06 2020-08-05 2020-09-04 2020-10-11 2021-02-08 Vehicle (1 nos) for Envelope Evaluation PMU/DONIDCR NP-DOCR-116237-GO-RFQ / Procurement of Interactive Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2019-07-06 2019-08-24 2019-09-23 voice response (IVR) Device Strengthening Quotations Envelope for Call Center Page 1 NP-DOCR-115056-GO-RFQ / Procurement of Remote Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2019-08-06 2019-09-10 2019-10-10 Access Software License for Strengthening Quotations Envelope VERSP MIS System Support NP-DOCR-184801-GO-RFB / Procurement of Smart card Reader, Bio-metric verification Under Device, Web-camera for Component 3: Institutional Single Stage - One IDA / 59120 Post Request for Bids Open - International 0.00 Implementati 2020-08-31 2021-02-28 2020-09-05 2021-03-19 2020-10-17 2020-11-16 2020-12-21 2021-06-19 online VER implemented Local Strengthening Envelope on Level to integrate between VERSP- MIS and NID Management system. NP-DOCR-184715-GO-RFQ / Pending Procurement of office Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Implementati 2020-09-20 2020-11-15 2021-02-13 Furniture for new building of Strengthening Quotations Envelope on DoNIDCR NP-DOCR-184716-GO-RFQ / Pending Procurement of Office Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Implementati 2020-09-02 2020-10-28 2021-01-26 furnishing materials for new Strengthening Quotations Envelope on office of DoNIDCR NP-DOCR-184719-GO-RFB / Procurement of Furniture and furnishing materials for Component 3: Institutional Single Stage - One IDA / 59120 Post Request for Bids Open - National 30,948.48 Signed 2020-09-10 2021-03-14 2020-09-15 2021-03-16 2020-10-27 2021-05-13 2020-11-26 2021-05-04 2020-12-31 2021-05-25 2021-06-29 establishment of Computer Strengthening Envelope lab, Video conference Hall and conference Hall NP-DOCR-126770-GO-RFB / Pending Procurement of IVR, VAS, SMS Component 3: Institutional Single Stage - One IDA / 59120 Post Request for Bids Open - National 0.00 Implementati 2020-08-16 2020-08-21 2020-08-24 2020-09-08 2020-09-29 2020-10-29 Gateway for Grievance Strengthening Envelope on Handeling NP-DOCR-184722-GO-RFQ / Procurement of Video conference devices, Pending Component 3: Institutional Request for Single Stage - One Software/license , Electrical IDA / 59120 Post Open - National 0.00 Implementati 2020-08-26 2020-10-21 2021-04-19 Strengthening Quotations Envelope and sound system in on DoNIDCR Video/conference Halls NP-DOCR-184859-GO-RFQ / Procurement of Desktop computer ,Printer, Scanner, Pending Component 3: Institutional Request for Single Stage - One and 4G Wireless Dongle for IDA / 59120 Post Open - National 0.00 Implementati 2020-09-05 2020-10-31 2021-04-29 Strengthening Quotations Envelope strengthening VER and SP on system of Ward office : 63 Local levels NP-DOCR-114931-GO-RFQ / Component 3: Institutional Request for Single Stage - One Procurement of Conference IDA / 59120 Post Open - National 0.00 Canceled 2020-01-06 2020-02-24 2020-03-25 Strengthening Quotations Envelope Device and License NP-DOCR-114933-GO-RFQ / Pending Procurement of Call Track Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Implementati 2020-09-20 2020-11-08 2020-12-08 Software/License for VERSP- Strengthening Quotations Envelope on MIS, Grievance Call Center NP-DOCR-73794-GO-RFB / Component 3: Institutional Single Stage - One Procurement of Air IDA / 59120 Post Request for Bids Open - National 0.00 Canceled 2018-10-01 2018-10-06 2018-11-17 2018-12-17 2019-01-21 2019-07-20 Strengthening Envelope Conditioner for PMU. NP-DOCR-26212-GO-RFQ / Component 4: Project Request for Single Stage - One Procurement of 3 Laser IDA / 59120 Management, Monitoring and Post Open - National 0.00 Canceled 2017-10-06 2017-11-29 2017-12-29 Quotations Envelope Printers for PMU Evaluation NP-DOCR-73822-GO-RFQ / Component 3: Institutional Request for Single Stage - One Procurement of Antivirus for IDA / 59120 Post Open - National 0.00 Canceled 2018-11-20 2019-02-01 2019-05-02 Strengthening Quotations Envelope Existing Srever System NP-DOCR-24580-GO-RFB / Component 3: Institutional Single Stage - One Procurement of 25 laptops for IDA / 59120 Post Request for Bids Open - National 0.00 Canceled 2017-10-01 2017-10-06 2017-11-05 2017-12-05 2018-01-11 2018-04-11 Strengthening Envelope PMU staff NP-DOCR-27891-GO-RFQ / Component 3: Institutional Request for Single Stage - One Procurement of Office IDA / 59120 Post Open - National 0.00 Canceled 2018-01-20 2018-04-09 2018-06-08 Strengthening Quotations Envelope Furnishing for PMU/DOCR NP-DOCR-25327-GO-DIR / Component 3: Institutional Request for Single Stage - One Procurement of Office IDA / 59120 Post Open - National 0.00 Canceled 2018-01-20 2018-04-09 2018-06-08 Strengthening Quotations Envelope Furniture for PMU/DOCR NP-DOCR-73818-GO-RFB / Hiring a Firm for Printing VER Act, Regulation, Guideline, Component 3: Institutional Single Stage - One Circulars, Social Security IDA / 59120 Post Request for Bids Open - National 0.00 Canceled 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20 Strengthening Envelope Guideline, e-Payment Strategy and Other Manuals for Service Unit. NP-DOCR-73818-GO-RFB-2 / Printing of Act, Regulation, Pending Component 3: Institutional Single Stage - One Guideline, Manual, IDA / 59120 Post Request for Bids Open - National 0.00 Implementati 2020-09-01 2020-09-06 2020-10-18 2020-10-28 2020-11-05 2020-12-05 Strengthening Envelope Communication Material etc. on related to department. NP-DOCR-186927-GO-RFB / Pending Component 3: Institutional Single Stage - One Vehicle purchase for PMU of IDA / 59120 Post Request for Bids Open - National 0.00 Implementati 2020-10-31 2020-11-05 2020-12-06 2020-12-20 2021-01-11 2021-02-25 Strengthening Envelope DoNIDCR (2 Nos) on Page 2 NP-DOCR-153037-GO-RFB / Procurement of Laptop Computer, Desktop Computer, HD Projector, Laser Printer, Heavy Duty Under Component 3: Institutional Single Stage - One Printer/Photocopier and LED IDA / 59120 Post Request for Bids Open - National 0.00 Implementati 2020-10-01 2021-03-14 2020-10-11 2021-03-16 2020-11-10 2020-11-20 2020-12-04 2021-01-03 Strengthening Envelope Screen for PMU and on Procurement of Desktop Computer and Other Equipment's for Training Lab Setup NP-DOCR-24717-GO-RFB / Service Units (SUs)- Component 3: Institutional Single Stage - One IDA / 59120 Post Request for Bids Open - National 616,336.88 Signed 2019-10-01 2019-07-30 2019-10-11 2019-11-10 2019-08-29 2019-11-30 2019-09-23 2020-01-06 2019-11-17 2020-05-05 Procurement of Laptop Strengthening Envelope Computers (1,000) for SU Staff NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Improving NP-DOCR-25333-NC-RFB / Under Coverage of Civil Registration Request for Single Stage - One Pilot Digitization-Procurement IDA / 59120 Post Open - National 0.00 Implementati 2018-06-06 2018-07-30 2018-10-28 and Social Security Quotations Envelope of Non Consulting Services on Allowances NP-DOCR-63277-NC-RFB / Component 1: Improving Hiring a Firm for Providing Under Coverage of Civil Registration Single Stage - One Scanning Services of Vital IDA / 59120 Post Request for Bids Open - National 0.00 Implementati 2018-09-23 2019-07-09 2018-09-28 2019-07-14 2018-10-28 2018-12-12 2019-01-18 2020-01-13 and Social Security Envelope Event Registration Information on Allowances Form. NP-DOCR-25179-NC-RFB / Procurement of Service for Component 2: Modernizing Single Stage - One Social Security beneficiary IDA / 59120 Social Security Delivery Post Request for Bids Open - National 0.00 Canceled 2017-12-15 2017-12-20 2018-01-19 2018-03-05 2018-04-09 2018-08-07 Envelope Data Collection, Entry and Systems Verification NP-DOCR-28181-NC-RFQ / HR Firm - Cluster 3 for SU : Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2018-07-07 2018-10-02 2019-03-31 Recruitment of MIS Operators Strengthening Quotations Envelope and Field Assistants NP-DOCR-28183-NC-RFQ / HR Firm - Cluster 5 for SU : Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2018-07-07 2018-10-02 2019-03-31 Recruitment of MIS Operators Strengthening Quotations Envelope and Field Assistants NP-DOCR-28182-NC-RFQ / HR Firm - Cluster 4 for SU : Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2018-07-07 2018-10-02 2019-03-31 Recruitment of MIS Operators Strengthening Quotations Envelope and Field Assistants NP-DOCR-28186-NC-RFQ / HR Firm - Cluster 7 for SU : Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2018-07-07 2018-10-02 2019-03-31 Recruitment of MIS Operators Strengthening Quotations Envelope and Field Assistants NP-DOCR-28185-NC-RFQ / HR Firm - Cluster 6 for SU : Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2018-07-07 2018-10-02 2019-03-31 Recruitment of MIS Operators Strengthening Quotations Envelope and Field Assistants NP-DOCR-25119-NC-RFB / Component 1: Improving Procurement of Service for Coverage of Civil Registration Single Stage - One IDA / 59120 Post Request for Bids Open - National 0.00 Canceled 2018-07-01 2018-07-06 2018-08-05 2018-09-19 2018-10-24 2019-10-19 digitizing CR registers in 11 and Social Security Envelope earthquake affected districts Allowances NP-DOCR-25245-NC-RFB / Component 1: Improving Digitization of Civil Coverage of Civil Registration Single Stage - One IDA / 59120 Post Request for Bids Open - National 0.00 Canceled 2019-06-15 2019-06-20 2019-07-20 2019-09-03 2019-09-25 2021-11-30 Registration (CR) Registers- and Social Security Envelope Province 2 Allowances NP-DOCR-28180-NC-RFQ / HR Firm - Cluster 2 for SU : Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Canceled 2018-07-06 2018-10-01 2019-03-30 Recruitment of MIS Operators Strengthening Quotations Envelope and Field Assistants NP-DOCR-183661-NC-RFQ / Digitization of vital events Component 1: Improving registration old record of Pending Coverage of Civil Registration Request for Single Stage - One Mechinagar, IDA / 59120 Post Open - National 0.00 Implementati 2020-09-02 2020-10-28 2021-01-26 and Social Security Quotations Envelope Biratnagar,Gadhimai, on Allowances Hetaunda,Bhimdutta, Birgunj and Nepalgunj (7 LLs) NP-DOCR- 183656-NC-RFB / Digitization of vital events Component 1: Improving Pending registration old records of Coverage of Civil Registration Single Stage - One IDA / 59120 Post Request for Bids Open - National 0.00 Implementati 2020-08-28 2020-09-02 2020-10-14 2020-11-13 2020-12-18 2021-04-17 Dharan, Bhaktapur, and Social Security Envelope on Kathmandu and pokhara (4 Allowances LLs) NP-DOCR-25180-NC-RFB / A local firm to manage media Component 1: Improving Pending houses (national radio, tv, Coverage of Civil Registration Single Stage - One IDA / 59120 Post Request for Bids Open - National 0.00 Implementati 2020-08-31 2020-09-14 2020-10-14 2020-11-13 2020-12-18 2021-10-31 etc.) for dissemination of and Social Security Envelope on communication and outreach Allowances material NP-DOCR-115193-NC-RFB / Hiring a Firm for Providing Scanning Services of Vital Component 1: Improving Event Registration Information Coverage of Civil Registration Single Stage - One IDA / 59120 Post Request for Bids Open - National 0.00 Canceled 2020-09-15 2020-09-20 2020-10-20 2020-11-19 2020-12-11 2021-10-30 Form : (1) Province 1, (2) and Social Security Envelope Province 2, (3) Province 3, (4) Allowances Province 4, (5) Province 5, (6) Province 6, (7) Province 7 Page 3 NP-DOCR-184868-NC-RFQ / Hiring a Firm for Post VER and Component 1: Improving SP Registration camp Pending Coverage of Civil Registration Request for Single Stage - One operation: Birgunj MPC, IDA / 59120 Post Open - National 0.00 Implementati 2020-09-05 2020-10-31 2021-04-29 and Social Security Quotations Envelope Bhatratpur MPC, Lalitpur MPC, on Allowances Kathmandu MPC, Pokhara MPC, Nepalgunj MPC (6 MUNs) NP-DOCR-184869-NC-RFB / Component 1: Improving Pending Hiring a Firm for VER and SP Coverage of Civil Registration Single Stage - One IDA / 59120 Post Request for Bids Open - National 0.00 Implementati 2020-09-06 2020-09-11 2020-10-23 2020-11-22 2020-12-27 2021-06-25 Registration Camp operation and Social Security Envelope on :24 Local Level Allowances NP-DOCR-184870-NC-RFQ / Component 1: Improving Pending Hioring a Firm for VER and SP Coverage of Civil Registration Request for Single Stage - One IDA / 59120 Prior Open - National 0.00 Implementati 2020-09-20 2020-11-15 2021-05-14 Registration Camp operation : and Social Security Quotations Envelope on 198 Local Level Allowances NP-DOCR-28179-NC-RFQ / Pending HR Firm : Recruitment of MIS Component 3: Institutional Request for Single Stage - One IDA / 59120 Post Open - National 0.00 Implementati 2020-10-06 2020-11-26 2020-12-26 Operators and Field Assistants Strengthening Quotations Envelope on (SU Staff) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-DOCR-27686-CS-QCBS / Component 1: Improving Firm to develop tool for Coverage of Civil Registration Quality And Cost- IDA / 59120 Post Open - National 3,815.45 Completed 2017-10-01 2018-03-30 2017-10-08 2017-10-22 2017-10-29 2017-11-05 2017-11-19 2018-04-01 2017-12-06 2018-04-22 2018-04-05 2018-07-10 mapping old and new local and Social Security Based Selection bodies Allowances Component 1: Improving NP-DOCR-27968-CS-QCBS / Coverage of Civil Registration Quality And Cost- Hiring a firm for Preparing IDA / 59120 Post Open - National 4,271.80 Completed 2017-11-30 2017-12-07 2017-12-28 2018-01-04 2018-01-11 2018-01-25 2018-06-03 2018-02-08 2018-06-04 2018-05-09 2018-09-04 and Social Security Based Selection Communication Strategy Allowances Component 1: Improving NP-DOCR-27834-CS-QCBS / Coverage of Civil Registration Quality And Cost- Procurement of service for IDA / 59120 Post Open - National 4,068.85 Completed 2017-10-01 2018-05-01 2017-10-08 2017-10-22 2018-05-04 2017-10-29 2018-05-10 2017-11-05 2018-05-13 2017-11-19 2018-05-18 2017-12-06 2018-05-27 2018-04-05 2018-07-10 and Social Security Based Selection Offline data migration Allowances NP-DOCR-25049-CS-CDS / Component 4: Project Hiring a Firm for training need Quality And Cost- IDA / 59120 Management, Monitoring and Post Open - National 4,267.33 Completed 2017-12-15 2017-12-22 2018-01-12 2018-01-19 2018-01-26 2018-02-09 2018-02-23 2018-05-02 2018-06-23 2018-07-10 assessment and preparation Based Selection Evaluation of Capacity Development Plan NP-DOCR-28037-CS-QCBS / Component 3: Institutional Quality And Cost- Hiring a Firm for developing IDA / 59120 Post Open - National 3,688.58 Completed 2018-01-01 2018-01-15 2018-01-29 2018-02-05 2018-02-12 2018-02-26 2018-03-12 2018-05-27 2018-05-11 2018-07-10 Strengthening Based Selection SU operational manual NP-DOCR-41328-CS-QCBS / Component 3: Institutional Quality And Cost- Hiring a Firm for developing IDA / 59120 Post Open - National 4,138.32 Completed 2018-03-30 2018-04-06 2018-04-28 2018-05-05 2018-05-12 2018-05-26 2018-06-09 2018-09-03 2018-09-07 2018-11-03 Strengthening Based Selection Survey manual NP-DOCR-56973-CS-QCBS / Technical Audit of Hardware , Component 3: Institutional Quality And Cost- IDA / 59120 Post Open - National 4,366.57 Completed 2018-05-30 2018-06-06 2018-06-20 2018-06-27 2018-07-04 2018-07-18 2018-08-01 2018-05-27 2018-11-29 2018-07-27 Security and Data of VER and Strengthening Based Selection SP Registration System NP-DOCR-63020-CS-QCBS / Component 3: Institutional Quality And Cost- Hiring a Firm for Training IDA / 59120 Post Open - National 3,949.77 Completed 2018-05-30 2018-06-06 2018-06-28 2018-07-05 2018-07-12 2018-07-26 2018-08-09 2018-08-20 2018-11-07 2018-11-20 Strengthening Based Selection Directive NP-DOCR-63038-CS-QCBS / Component 3: Institutional Quality And Cost- Under Consulting Service for Existing IDA / 59120 Post Open - National 0.00 2018-05-30 2018-09-05 2018-06-06 2018-06-20 2018-06-27 2018-07-04 2018-07-18 2018-08-01 2018-09-30 Strengthening Based Selection Implementation Database Optimization NP-DOCR-63077-CS-QCBS / Component 1: Improving Consulting Service for VER Coverage of Civil Registration Quality And Cost- Under IDA / 59120 Post Open - National 0.00 2018-05-30 2018-06-06 2018-06-20 2018-06-27 2018-07-04 2018-07-18 2018-08-01 2018-09-30 Data Digitation Applicaction and Social Security Based Selection Implementation Development Allowances NP-DOCR-63085-CS-QCBS / Component 2: Modernizing Quality And Cost- Under Hiring a Firm for Social IDA / 59120 Social Security Delivery Post Open - National 0.00 2018-05-30 2019-06-06 2018-06-06 2018-06-20 2019-06-14 2018-06-27 2019-06-16 2018-07-04 2019-06-18 2018-07-18 2019-06-19 2018-08-01 2018-09-30 Based Selection Implementation Security Data Cleaning Systems NP-DOCR-63285-CS-QCBS / Component 3: Institutional Quality And Cost- Under Hiring a Firm for Grievance IDA / 59120 Post Open - National 0.00 2018-07-30 2018-08-06 2018-08-28 2018-09-04 2018-09-11 2018-09-25 2018-10-09 2019-01-07 Strengthening Based Selection Implementation Handling Manual Preparation NP-DOCR-28205-CS-QCBS / Hiring a firm for Online Vital Component 3: Institutional Quality And Cost- Under IDA / 59120 Post Open - National 0.00 2018-05-30 2019-04-19 2018-06-06 2018-06-20 2018-06-27 2018-07-04 2018-07-18 2018-08-01 2018-11-29 Event Registration Directive Strengthening Based Selection Implementation preparation Component 1: Improving NP-DOCR-25660-CS-CQS / Consultant Coverage of Civil Registration Hiring a Firm for VER Bill IDA / 59120 Post Qualification Open - National 0.00 Canceled 2018-08-15 2018-08-30 2018-09-29 2018-10-06 2018-11-10 2019-05-09 and Social Security Preparation Selection Allowances NP-DOCR-25036-CS-CQS / Component 1: Improving Hiring a Firm for preparation Consultant Coverage of Civil Registration Pending of Communication Content IDA / 59120 Post Qualification Open - National 0.00 2019-08-01 2019-08-16 2019-09-15 2019-09-22 2019-10-06 2019-12-05 and Social Security Implementation (Videos, radio jingles, other Selection Allowances print content). NP-DOCR-24972-CS-CQS / Component 1: Improving Consultant Consulting Firm to develop Coverage of Civil Registration IDA / 59120 Post Qualification Open - National 0.00 Canceled 2018-06-15 2018-06-29 2018-07-27 2018-08-10 2018-09-01 2018-11-30 app for data collection and a and Social Security Selection user manual Allowances NP-DOCR-25325-CS-CQS / Consultant Component 3: Institutional Feasibility Study for Location IDA / 59120 Post Qualification Open - National 0.00 Canceled 2018-06-10 2018-06-25 2018-07-23 2018-07-30 2018-08-21 2018-11-19 Strengthening of Service Unit Selection Page 4 NP-DOCR-28216-CS-CQS / Hiring a firm for generation Consultant Component 3: Institutional and use of vital statistics IDA / 59120 Post Qualification Open - National 0.00 Canceled 2018-08-01 2018-08-16 2018-09-22 2018-09-29 2018-10-13 2018-12-12 Strengthening (including use of statistical Selection tools and GIS) NP-DOCR-24960-CS-CQS / Component 4: Project Consultant Procurement of Consulting IDA / 59120 Management, Monitoring and Post Qualification Open - National 0.00 Canceled 2019-08-01 2019-08-16 2019-09-07 2019-09-14 2019-10-06 2020-04-03 Service for Baseline Survey Evaluation Selection NP-DOCR-184872-CS-CQS / Hiring a Firm for Satisfaction survey of Vital Event Component 2: Modernizing Consultant Registration and Social Pending IDA / 59120 Social Security Delivery Post Qualification Open - National 0.00 2020-10-15 2020-11-05 2020-12-19 2021-01-18 2021-02-22 2021-08-21 protection Management Implementation Systems Selection information System (VERSP- MIS) Users and prepare VERSP- MIS improvement plan NP-DOCR-184873-CS-QBS / Consulting service for Social Component 3: Institutional Quality Based Pending Security Beneficiaries Data IDA / 59120 Post Open - National 0.00 2020-11-30 2020-12-15 2021-01-06 2021-01-13 2021-01-20 2021-01-27 2021-02-18 2021-05-19 Strengthening Selection Implementation cleaning of VERSP-MIS : Phase 2 NP-DOCR-184875-CS-CQS / Consulting service for Component 2: Modernizing Consultant verification of Social Security Pending IDA / 59120 Social Security Delivery Post Qualification Open - National 0.00 2020-11-30 2020-12-21 2021-02-03 2021-03-05 2021-04-09 2021-10-06 Beneficiaries Name list with Implementation Systems Selection GoN pension system and DE- Duplication NP-DOCR-184883-CS-CQS / Consulting services for Component 2: Modernizing Consultant integration and verification of Pending IDA / 59120 Social Security Delivery Post Qualification Open - National 0.00 2020-12-15 2021-01-05 2021-02-18 2021-03-20 2021-04-24 2021-10-21 social security Beneficiaries Implementation Systems Selection Name list with NID Management system NP-DOCR-184889-CS-CQS / Consulting service for end line Component 4: Project Consultant Pending survey ( Beneficiaries IDA / 59120 Management, Monitoring and Post Qualification Open - National 0.00 2020-12-31 2021-01-21 2021-03-06 2021-04-05 2021-05-10 2021-11-06 Implementation Satisfaction Survey) of SSSPCR Evaluation Selection Project NP-DOCR-192677-CS-QCBS / Hiring a Firm for Component 2: Modernizing Quality And Cost- Under Disbursement Linked IDA / 59120 Social Security Delivery Post Open - National 0.00 2021-02-10 2021-01-29 2021-03-03 2021-04-19 2021-04-16 2021-05-01 2021-05-21 2021-06-25 2021-07-23 2021-11-20 Based Selection Implementation Indicator (DLI) verification Systems (Third Party Verification) NP-DOCR-207128-CS-QCBS / Consulting Service for gap Component 3: Institutional Quality And Cost- Under IDA / 59120 Post Open - National 0.00 2020-12-15 2020-01-10 2020-12-30 2021-01-13 2021-04-29 2021-01-20 2021-01-27 2021-02-10 2021-02-24 2021-05-25 analysis of VERSP-MIS System Strengthening Based Selection Implementation and prepare Improvement plan INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-DOCR-24721-CS-INDV / Individual Senior Procurement Specialist Consultant (1) to Component 4: Project Individual Under work as part of the Project IDA / 59120 Management, Monitoring and Prior Consultant Open 0.00 2017-09-06 2018-09-10 2017-10-19 2018-10-04 2017-10-26 2019-04-18 2017-11-04 2021-11-30 Implementation Management Unit on a part Evaluation Selection time basis for the period of thee year NP-DOCR-24723-CS-INDV / Individual Programme Officer Component 4: Project Individual (1) to work as part of the IDA / 59120 Management, Monitoring and Post Consultant Open 662.08 Signed 2017-09-11 2017-11-15 2017-10-15 2018-01-08 2017-10-22 2017-11-08 2018-05-16 2021-11-30 Project Management Unit for Evaluation Selection for the project period NP-DOCR-24725-CS-INDV / Individual Project FM Specialist (1) to work as part Component 4: Project Individual of the Project Management Under IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 2017-09-06 2019-11-03 2017-10-19 2017-10-26 2017-11-04 2021-11-30 Unit on a full time basis for Implementation Evaluation Selection initial period of 1 year/12 month and subsequently on a part time basis. NP-DOCR-24927-CS-INDV / Component 4: Project Individual MIS Team Leader on a full IDA / 59120 Management, Monitoring and Post Consultant Open 1,103.46 Signed 2017-09-08 2017-10-21 2017-10-28 2017-11-06 2018-05-16 2021-12-19 time basis for PMU initially for Evaluation Selection 4 years/ 48 months. NP-DOCR-24929-CS-INDV / MIS System Analyst for PMU- Component 4: Project Individual Under Position-1 : Full Time for IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 2017-09-08 2017-10-21 2017-10-28 2017-11-06 2021-11-30 Implementation initial period of 4 years/48 Evaluation Selection months. NP-DOCR-24932-CS-INDV / MIS Database administrator Component 4: Project Individual for PMU on a full time basis IDA / 59120 Management, Monitoring and Post Consultant Open 971.04 Signed 2017-09-08 2017-11-15 2017-10-21 2018-01-08 2017-10-28 2018-05-09 2017-11-06 2018-05-16 2021-11-30 for a initial period of 4 years / Evaluation Selection 48 months. NP-DOCR-24933-CS-INDV / MIS Senior Component 4: Project Individual Developer/Programmer for IDA / 59120 Management, Monitoring and Post Consultant Open 662.08 Signed 2017-09-08 2017-10-21 2017-10-28 2017-11-06 2018-05-16 2021-11-30 PMU on a full time basis for Evaluation Selection an initial period of 4 years /48 months. Page 5 NP-DOCR-27469-CS-INDV / MIS System Analyst for PMU- Component 4: Project Individual Position-2 : Full Time for IDA / 59120 Management, Monitoring and Post Consultant Open 971.04 Signed 2017-09-08 2017-11-15 2017-10-21 2018-01-11 2017-10-28 2017-11-06 2018-05-16 2021-11-30 initial period of 4 years/48 Evaluation Selection months. NP-DOCR-27830-CS-INDV / MIS Developer/Programmer Component 4: Project Individual for PMU on a full time basis IDA / 59120 Management, Monitoring and Post Consultant Open 3,656.38 Signed 2017-12-01 2020-05-15 2018-01-06 2020-11-19 2018-01-13 2020-11-30 2018-02-04 2020-12-01 2021-11-30 for an initial period of 4 years Evaluation Selection /48 months. (3 nos) NP-DOCR-41323-CS-INDV / Individual Communication Component 4: Project Individual Officer (VER & SS) on a full IDA / 59120 Management, Monitoring and Post Consultant Open 485.52 Signed 2018-03-20 2018-05-08 2018-05-29 2018-07-03 2018-07-24 2021-11-30 time basis for the initially for Evaluation Selection 4 years/48 months NP-DOCR-24729-CS-INDV / Individual Communication Component 4: Project Individual Specialist to work on part time IDA / 59120 Management, Monitoring and Post Consultant Open 4,547.10 Signed 2018-06-15 2020-04-15 2018-07-28 2020-11-19 2018-08-04 2020-11-30 2018-08-13 2020-12-01 2021-11-30 basis in the Project Evaluation Selection Management Unit for 6 months each year for 4 years NP-DOCR-24931-CS-INDV / Component 4: Project Individual Assistant Data Base Under IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 2018-08-01 2020-05-15 2018-09-13 2018-09-20 2018-10-07 2021-11-30 Administrator for PMU initially Implementation Evaluation Selection 4 years (2 nos) NP-DOCR-24935-CS-INDV / Component 4: Project Individual MIS Support/Training Staff (4 IDA / 59120 Management, Monitoring and Post Consultant Open 702.58 Signed 2018-08-01 2019-11-03 2018-09-07 2018-09-15 2018-09-14 2018-09-28 2018-10-04 2021-11-30 nos) for PMU for Project Evaluation Selection Period NP-DOCR-110301-CS-INDV Individual / Individual Consultant Component 3: Institutional Under IDA / 59120 Post Consultant Open 0.00 2019-05-15 2019-09-03 2019-06-22 2019-06-29 2019-07-16 2021-11-30 Project/Admin Assistant (Nos. Strengthening Implementation Selection 2) for Project Period NP-DOCR-24936-CS-INDV / Network configuration as part Component 4: Project Individual Pending of the PMU on a part time IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 2019-09-01 2019-10-08 2019-10-15 2019-10-29 2021-11-30 Implementation basis (3 month in a year) for Evaluation Selection the project period. NP-DOCR-24923-CS-INDV / Individual Civil Registration and legal policies Consultant Component 4: Project Individual to work as part of the PMU on IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 Canceled 2018-12-02 2019-01-08 2019-01-15 2019-01-29 2021-11-30 a part time basis (3 month in Evaluation Selection a year) for the period of thee year NP-DOCR-24922-CS-INDV / Individual Social Protection Component 4: Project Individual Specialist Consultant to work IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 Canceled 2018-08-15 2018-09-21 2018-09-28 2018-10-12 2021-11-30 part-time as part of the PMU Evaluation Selection for a total of 24 months for the project period NP-DOCR-24921-CS-INDV / Individual Component 4: Project Individual Governance/Institutional IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 Canceled 2018-08-15 2018-09-21 2018-09-28 2018-10-12 2021-11-30 Strengthening Consultant for Evaluation Selection PMU full time basis initial for the period of 4 year. NP-DOCR-24727-CS-INDV / Individual Senior Accounts Component 4: Project Individual Assistant (1) for PMU : full IDA / 59120 Management, Monitoring and Post Consultant Open 2,434.23 Signed 2019-08-01 2020-05-15 2019-09-11 2019-11-01 2019-09-18 2020-12-07 2019-09-27 2020-12-07 2021-11-30 time position for project Evaluation Selection period. NP-DOCR-24924-CS-INDV / Individual M&E Consultant as Component 4: Project Individual part of the PMU on a part time IDA / 59120 Management, Monitoring and Post Consultant Open 4,547.10 Signed 2019-08-01 2020-05-15 2019-09-11 2020-11-19 2019-09-24 2020-11-30 2019-10-08 2020-12-01 2021-11-30 basis (4 month in a year) for Evaluation Selection the project period. NP-DOCR-128928-CS-INDV Individual / Individual Consultant Senior Component 3: Institutional Pending IDA / 59120 Post Consultant Open 0.00 2019-10-15 2019-11-04 2019-11-11 2019-12-02 2021-11-30 Database Expert for Project Strengthening Implementation Selection Period as a Intermittent basis. NP-DOCR-24925-CS-INDV / SU Staff by HR Firm: MIS Operators - Approx 1,000 in number, full time, for a period Individual Component 3: Institutional of 4 years/48 month, The IDA / 59120 Post Consultant Open 0.00 Canceled 2018-10-01 2018-12-20 2019-01-03 2019-01-25 2021-11-30 Strengthening value in PP is cumulative. Selection Approximate monthly salary of a single MIS Operator is NPR 35,000 or USD 342 NP-DOCR-135491-CS-CDS / Component 3: Institutional Hiring a Training Firm/Entity IDA / 59120 Post Direct Selection Direct 157,519.94 Signed 2019-10-15 2019-11-10 2019-10-25 2019-11-18 2019-11-23 2020-02-17 2020-02-21 Strengthening to Train Service Unit Staff NP-DOCR-24937-CS-INDV / Component 4: Project Individual Grievance Manager for PMU IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 Canceled 2019-07-01 2019-08-07 2019-08-14 2019-08-28 2021-11-30 full time basis initially for the Evaluation Selection project period. NP-DOCR-114024-CS-INDV / Individual Account Assistant Individual Component 3: Institutional (3) to work as part of the IDA / 59120 Post Consultant Open 0.00 Canceled 2019-06-15 2019-07-23 2019-07-30 2019-08-16 2021-11-30 Strengthening Project Management Unit for Selection the project period Page 6 NP-DOCR-24722-CS-INDV / Individual Procurement Officer Component 4: Project Individual Consultant (1) to work as part IDA / 59120 Management, Monitoring and Prior Consultant Open 0.00 Canceled 2019-08-01 2019-09-13 2019-09-20 2019-09-29 2021-11-30 of the Project Management Evaluation Selection Unit on a full time basis for project period. NP-DOCR-128927-CS-INDV Individual / Individual Consultant Component 3: Institutional Pending IDA / 59120 Post Consultant Open 0.00 2019-10-15 2019-11-18 2019-11-25 2019-12-09 2020-06-06 Network Expert for Project Strengthening Implementation Selection Period as a Intermittent basis. NP-DOCR-24938-CS-INDV / Technical Document Writer as Component 4: Project Individual part of the PMU on a part time IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 Canceled 2019-09-01 2019-10-08 2019-10-15 2019-10-29 2021-11-30 basis (4 month in a year) for Evaluation Selection the project period.. NP-DOCR-24934-CS-INDV / Component 4: Project Individual Senior Support Engineer (1 IDA / 59120 Management, Monitoring and Post Consultant Open 0.00 Canceled 2019-07-01 2019-08-07 2019-08-14 2019-08-28 2021-11-30 nos) for PMU full time basis Evaluation Selection initially for the project period Page 7 Procurement Plan for Wuhan Component Table-1 2018 Procurement Plan for Wuhan Integrat Wuhan Intellige Goods a (Exchange rate(USD(RMB=1(6.5( Date(2018.2.11 1 No. 2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Notes(The contracts relate to WTB will be adjusted according to the preliminary design ,which has not completed yet. The contracts in this ta Procurement Plan for Anlu-June 2018 Wuhan Urban Cycle Traffic Integration Demonstration Project under World Ba Xiaogan Anlu Urban Transportation Infrastructure Subproject --2018 Procurem (exchange rate, USD: RMB = 1:6.4425) Preparation time: June 12,2018 1 2 3 4 5 6 7 8 Esti Esti mat WB Ex mat Procu Revie t N ed ed reme Contract w B o Contract Name Contract Content Cost Cost nt No. (Prio Op . (10k (10k Meth r/Pos RMB USD od t) D ) ) 2610 405 2018 6.61 2.25 Road, drainage, greening, Zhanqian Road (Hengyi Road - Anjing electrical lighting, traffic signs, 7394. 1147 20 1 TC5-CW3 Line) civil engineering and traffic marking, traffic barriers and 44 .76 NCB Prior 10 Traffic works so on PT1.1- High-speed rail station passenger High-speed rail station passenger 7000. 1086 20 2 CW3 terminal + bus transfer hub terminal + bus transfer hub 00 .53 NCB Prior 1 Short-distance station: Bus PT1.3/PT1 short-distance bus transfer hub, smalltransfer hub, parking lot 1500. 232. 20 3 .4/PT1.6- arrival - departure bus hub in railwayRailway station small arrival and NCB Post 00 83 1 CW1 station departure bus hub: Bus transfer facilities TC3/TC4/ Jinqiu Avenue (Yinxing Avenue - Biyun (Jinqiu Avenue )Traffic pipelines, 2000. 310. 20 4 RS-G1 Road) / Taibai Avenue (Yinxing Avenue electronic police, video 00 44 NCB Prior 7 - Jiangxia Road) intelligent traffic surveillance, bayonet, signal management engineering control, communications, etc.; Zhanqian Road (Hengyi Road - Anjing Traffic pipelines, electronic police, 368.7 57.2 20 5 TC5-G Line) intelligent traffic management video surveillance, bayonet, signal NCB Post 8 4 1 facilities control, communications, etc. PT2- 2016 Bus procurement + 2017 Bus 80 Electric buses 8 meters 6400. 993. 20 6 G1/PT2- procurement 20 Electric buses 10 meters 00 40 NCB Prior 11 G2 Dispatching center, vehicle- PT3- mounted system, depot 2016 Intelligent bus system + 2017 1228. 190. 20 7 G1/PT3- dispatching system, NCB Post Intelligent bus system 00 61 1 G2 communication system, electronic station board, e-card system Cost control throughout 215.3 33.4 20 8 TA5.2 Cost control throughout construction QCBS Post construction 9 3 5 Remarks: NCB: Domestic competitive tendering; Shopping: Inquiry and procurement; QCBS: Quality- and cost-based selection mode; CQS: S based on supplier’s qualification Prepared by: Business Development Department Division Leader: Main Leader: PROCUREMENT China : Wuhan Integrated Transport Development PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-07-18 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P148294 GPN Date: Project Name: Wuhan Integrated Transport Development Loan / Credit No: IBRD / 85890 Anlu Construction Development and Investment Company Limited Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 1. Integrated TC3/TC4-CW1 / Anlu-Taibai Single Stage - One 17,189,457. IBRD / 85890 Corridor and Road Safety Prior Request for Bids Open - National 0.00 Signed 2017-07-20 2017-09-15 Avenue & Jinqiu Avenu Envelope 15 Improvements in Anlu TC5-CW3 / Zhanqian Road Component 1. Integrated Single Stage - One 10,631,400.0 5,398,051.6 2020-01- civil engineering and traffic IBRD / 85890 Corridor and Road Safety Prior Request for Bids Open - National Signed 2018-11-19 2018-11-21 2018-11-24 2018-11-27 2019-01-05 2018-12-28 2019-02-04 2019-01-03 2019-03-20 2019-02-23 Envelope 0 7 14 engineering Improvements in Anlu TC5-CW3-N / Zhanqian Road (Hengwu Road to Jiefang Avenue section) civil and traffic engineering, is the Component 1. Integrated northern section of Zhanqian Single Stage - One 5,481,421.7 2020-04- IBRD / 85890 Corridor and Road Safety Post Request for Bids Open - National 7,913,069.00 Signed 2019-07-07 2019-07-12 2019-07-10 2019-08-21 2019-08-13 2019-09-20 2019-08-13 2019-10-25 2019-09-05 Road. The construction Envelope 8 22 Improvements in Anlu content includes roads, water supply and drainage pipes, greening, electric and lighting, traffic signs, etc. PT1.4/PT1.6-CW1 / Short Component 2. Public Distance Station Bus Hub and Single Stage - One 2020-12- IBRD / 85890 Transport Improvements in Post Request for Bids Open - National 1,337,948.27 0.00 Canceled 2019-10-30 2019-11-04 2019-12-16 2020-01-15 2020-02-28 Railway Station Bus Terminal Envelope 24 Anlu Hub. Component 2. Public PT1.6-CW1 / Railway Station Single Stage - One 2020-11- IBRD / 85890 Transport Improvements in Post Request for Bids Open - National 601,507.14 583,541.80 Signed 2020-01-16 2020-01-20 2020-01-17 2020-02-28 2020-04-23 2020-03-29 2020-04-23 2020-05-12 2020-06-28 Bus Terminal Hub Envelope 08 Anlu TC1/TC2-CW2 / Jiefang Component 1. Integrated Single Stage - One 5,678,625.0 2021-08- Avenue and Biyun Road civil IBRD / 85890 Corridor and Road Safety Post Request for Bids Open - National 7,000,000.00 Signed 2020-04-12 2020-04-16 2020-04-17 2020-05-29 2020-05-19 2020-06-28 2020-07-02 2020-08-11 2020-09-16 Envelope 4 11 and traffic engineering Improvements in Anlu PT1.1-CW3 / High-speed Component 2. Public Under Single Stage - One 2022-03- Railway Passenger Transport IBRD / 85890 Transport Improvements in Post Request for Bids Open - National 5,121,522.00 0.00 Implementat 2020-12-31 2021-03-18 2021-01-03 2021-02-02 2021-02-07 2021-03-29 Envelope 29 Center and Bus Transfer Hub Anlu ion PT1.2-CW4 / Bus Transfer Component 2. Public Pending Single Stage - One 2022-03- Hub of Nancheng Passenger IBRD / 85890 Transport Improvements in Post Request for Bids Open - National 2,837,841.16 0.00 Implementat 2020-12-31 2021-01-03 2021-02-02 2021-02-07 2021-03-29 Envelope 29 Transport Center Station Anlu ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TC3/TC4-G1 / Jinqiu Avenue Component 1. Integrated Single Stage - One & Taibai Avenue intelligent IBRD / 85890 Corridor and Road Safety Prior Request for Bids Open - National 2,884,837.30 1,243,447.07 Signed 2018-12-03 2018-12-10 2018-12-08 2019-01-19 2019-01-15 2019-02-18 2019-01-18 2019-03-25 2019-03-15 2019-10-21 Envelope traffic management facilities Improvements in Anlu TC5-G / Zhanqian Road Component 1. Integrated Single Stage - One intelligent traffic management IBRD / 85890 Corridor and Road Safety Post Request for Bids Open - National 549,474.78 298,098.99 Signed 2019-02-11 2019-02-27 2019-02-16 2019-03-30 2019-05-30 2019-04-29 2019-05-30 2019-06-03 2019-08-07 2019-11-30 Envelope facilities Improvements in Anlu TC5-G-N / Zhanqian Road Component 1. Integrated (Hengwu Road to Jiefang Request for Single Stage - One IBRD / 85890 Corridor and Road Safety Post Open - National 147,715.47 141,061.00 Signed 2019-11-01 2019-12-27 2019-12-20 2020-05-25 Avenue section) intelligent Quotations Envelope Improvements in Anlu traffic management facilities. TC1/TC2-G2 / Jiefang Component 1. Integrated Avenue and Biyun Road Single Stage - One IBRD / 85890 Corridor and Road Safety Prior Request for Bids Open - National 2,340,981.29 0.00 Canceled 2020-05-15 2020-05-20 2020-06-19 2020-07-04 2020-08-18 2021-03-16 intelligent traffic management Envelope Improvements in Anlu facilities RS-G1 / Intelligent Component 1. Integrated Single Stage - One Transportation Command IBRD / 85890 Corridor and Road Safety Post Request for Bids Open - National 1,270,737.73 0.00 Canceled 2020-05-15 2020-05-20 2020-06-19 2020-07-04 2020-08-18 2020-12-16 Envelope Center Improvements in Anlu TC1/TC2-G2&RS-G1 / Jiefang Avenue and Biyun Component 1. Integrated Road intelligent traffic Single Stage - One IBRD / 85890 Corridor and Road Safety Prior Request for Bids Open - National 3,614,525.93 3,743,605.89 Signed 2020-07-30 2020-08-14 2020-08-04 2020-08-07 2020-09-21 2020-08-21 2020-09-24 2020-10-04 2020-10-23 2021-07-31 management facilities and Envelope Improvements in Anlu Intelligent Transportation Command Center NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4. Technical Pending TA7.4 / Civil works quality Request for Single Stage - One IBRD / 85890 Assistance and Project Post Open - National 313,740.00 0.00 Implementati 2020-11-11 2021-01-06 2021-12-27 inspection service Quotations Envelope Management on TA7.6 / Intelligent Component 4. Technical Pending transportation system Request for Single Stage - One IBRD / 85890 Assistance and Project Post Open - National 47,100.00 0.00 Implementati 2021-06-20 2021-08-15 2021-10-14 engineering quality inspection Quotations Envelope Management on service. Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TA7.1 / Intelligent Transportation System and Intelligent Bus System Project Component 4. Technical Consultant Supervision, services for: IBRD / 85890 Assistance and Project Post Qualification Open - National 233,176.32 199,178.02 Signed 2019-10-31 2020-05-28 2019-11-21 2020-06-19 2020-01-04 2020-08-14 2020-02-03 2020-08-20 2020-03-09 2020-09-07 2021-10-30 Jiefang Avenue and Biyun Management Selection RoadIntelligent Transportation System, Intelligent Traffic Command Center, etc. TA7.2 / Civil Engineering Supervision, services for 9 civil works include HSR Station Passenger Transport Center Component 4. Technical Quality And Cost- Bus Transfer Hub, Passenger IBRD / 85890 Assistance and Project Post Open - National 457,520.19 460,458.08 Signed 2019-10-31 2019-09-28 2019-11-21 2019-11-11 2020-01-04 2019-12-16 2020-02-01 2020-01-14 2020-03-02 2020-01-14 2020-04-06 2020-01-15 2020-05-11 2020-05-28 2022-06-30 Based Selection Transport Center Hub Management (Nancheng), Short Distance Station Bus Hub, Railway Station Bus Terminal Hub, etc. Component 4. Technical Consultant TA2 / Bus route optimization IBRD / 85890 Assistance and Project Post Qualification Open - National 116,191.30 0.00 Canceled 2019-08-31 2019-11-08 2019-09-21 2019-11-04 2019-12-04 2020-01-08 2021-12-28 consulting service. Management Selection TA2-NEW / Bus route Component 4. Technical Consultant optimization consulting IBRD / 85890 Assistance and Project Post Qualification Open - National 141,103.42 153,597.54 Signed 2020-04-06 2020-04-03 2020-04-27 2020-05-07 2020-06-10 2020-07-02 2020-07-10 2020-07-13 2020-08-14 2020-07-30 2022-08-04 service Management Selection TA7.3 / Cost control in the Component 4. Technical Consultant whole process of civil works, IBRD / 85890 Assistance and Project Post Qualification Open - National 304,907.00 307,192.00 Signed 2020-06-10 2020-06-05 2020-06-25 2020-09-03 2020-07-22 2020-09-24 2020-07-29 2020-09-28 2020-08-12 2020-10-15 2021-12-25 goods and consulting services Management Selection TA7.5 / Non-motorized Component 4. Technical Consultant Traffic design consulting IBRD / 85890 Assistance and Project Post Qualification Open - National 110,000.00 114,000.86 Signed 2020-09-18 2020-09-18 2020-09-25 2020-10-26 2020-11-04 2020-12-02 2020-11-18 2020-12-11 2020-12-23 2021-01-12 2021-01-13 service. Management Selection TA3&TA4 / Research on Non- Component 4. Technical Consultant motorized Vehicle Traffic Under IBRD / 85890 Assistance and Project Post Qualification Open - National 219,900.00 0.00 2020-10-09 2020-10-27 2020-10-24 2020-12-01 2020-12-03 2020-12-10 2020-12-24 2021-12-19 Development and Static Implementation Management Selection Traffic System in Anlu City. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN (Textual Part) Project information: São Tomé and Príncipe - Institutional Capacity Building Project (P162129) Project Implementation agency: Projects Administrative and Fiduciary Agency (AFAP) Date of the Procurement Plan: August 2017 Period covered by this Procurement Plan: August 2017 – March 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Procurement Law (Law 8/2009 of August 26), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables; PROCUREMENT Sao Tome and Principe : Sao Tome and Principe: Institutional Capacity Building Project PLAN General Information Country: Sao Tome and Principe Bank’s Approval Date of the Original Procurement Plan: 2017-09-19 2021-05-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162129 GPN Date: Project Name: Sao Tome and Principe: Institutional Capacity Building Project Loan / Credit No: IDA / D3080, / , IDA / V1240 Project Fiduciary and Administrative Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02/G/ICB/2018 / Supply of Strengthening Budget Request for Single Stage - One informatic equipment for VAT IDA / V1240 Credibility, Tax Base and SOE Post Limited 50,000.00 269,373.65 Completed 2018-03-06 2018-11-13 2018-05-01 2019-02-08 2018-10-28 2019-07-29 Quotations Envelope Offices Governance 04/G/ICB/2018 / Supply of Strengthening Budget materials and equipment for Request for Single Stage - One IDA / V1240 Credibility, Tax Base and SOE Post Limited 250,000.00 197,704.66 Completed 2018-02-27 2019-04-08 2018-04-24 2019-06-21 2018-10-21 2019-12-02 the refurbishment of VAT Quotations Envelope Governance rooms 16/G/ICB/2019 / Acquisition of construction materials and Property Registration and Single Stage - One equipments for IDA / D3080 Post Request for Bids Open - National 150,000.00 277,368.38 Completed 2019-03-29 2020-02-07 2019-04-03 2019-05-15 2020-04-27 2019-06-14 2020-04-30 2019-07-19 2020-05-25 2020-01-15 2020-09-22 Statistical Development Envelope refurbishement of INE building 17/C/ICB/2019 / Purchase of Property Registration and Request for Single Stage - One surveillance cameras and A/C IDA / D3080 Post Limited 20,000.00 10,800.00 Signed 2019-03-05 2019-04-30 2019-03-12 2019-10-27 Statistical Development Quotations Envelope for INE building 35/G/ICB/2019 / Acquisition Property Registration and Request for Single Stage - One of software and IT equipments IDA / D3080 Post Open - National 50,000.00 55,634.72 Completed 2019-03-05 2019-04-30 2019-07-11 2019-10-27 2019-11-11 Statistical Development Quotations Envelope for INE 36/G/ICB/2019 / Acquisition Property Registration and Request for Single Stage - One IDA / D3080 Post Open - National 100,000.00 0.00 Canceled 2019-04-03 2019-06-28 2019-05-29 2019-11-25 of IT equipments for DGRN Statistical Development Quotations Envelope 39/G/ICB/2018 / Acquisition of minibus, double cabine Property Registration and Single Stage - One IDA / D3080 Post Request for Bids Open - National 70,000.00 106,331.33 Completed 2019-02-25 2018-10-17 2019-03-02 2019-08-23 2019-04-13 2018-11-27 2019-05-13 2018-12-14 2019-06-17 2019-02-05 2019-12-14 2019-05-29 pick up and motorcicles for Statistical Development Envelope INE and PIU 2/G/ICB/2018 / Acquisition Strengthening Budget Request for Single Stage - One of Informatic equipments and IDA / V1240 Credibility, Tax Base and SOE Post Limited 280,352.66 271,796.25 Completed 2019-03-31 2018-09-27 2019-05-26 2019-02-08 2019-11-22 2019-07-29 Quotations Envelope softwares for DiTEI Governance 37/G/ICB/2019 / Acquisition Property Registration and IDA / D3080 Post Direct Selection Direct 5,000.00 3,990.00 Completed 2019-02-28 2019-03-12 2019-03-05 2019-03-12 2019-04-09 2019-03-22 2019-10-06 2019-03-24 of software STATA for INE Statistical Development 15/C/2019 / Acquisition of Financial Soundness and Request for Single Stage - One power generator for Debt IDA / D3080 Post Limited 30,000.00 26,751.99 Completed 2019-03-05 2019-05-30 2019-04-30 2019-07-30 2019-10-27 2019-08-26 Access Quotations Envelope Department and DGRN 11/G/ICB/2019 / Acquisition Under Financial Soundness and Request for Single Stage - One of a Back-up for data security IDA / D3080 Post Open - National 6,000.00 0.00 Implementati 2019-11-20 2020-01-15 2020-07-13 Access Quotations Envelope for Debt Department on 12/G/ICB/2019 / Acquisition Financial Soundness and Request for Single Stage - One of informatic equipment for IDA / D3080 Post Open - National 13,000.00 14,699.88 Signed 2019-05-29 2019-06-28 2019-07-24 2019-10-03 2020-01-20 Access Quotations Envelope Debt Deparment 54/G/RFQ/PRCI/2019 / Property Registration and Request for Single Stage - One Acquisition of IT equipments IDA / D3080 Post Limited 100,000.00 133,299.14 Completed 2019-09-28 2019-10-22 2019-11-23 2019-12-19 2020-05-21 2020-03-17 Statistical Development Quotations Envelope for DGRN Strengthening Budget Under 03/G/ICB/2018 / Supply of Request for Single Stage - One IDA / V1240 Credibility, Tax Base and SOE Post Limited 40,000.00 0.00 Implementati 2020-02-22 2021-03-10 2020-04-18 2020-10-15 Furniture for VAT Offices Quotations Envelope Governance on 71/G/PRCI/2020 / Acquisition of Tablets and Property Registration and Request for Single Stage - One IDA / D3080 Post Limited 35,000.00 23,048.53 Completed 2020-10-10 2020-10-01 2020-12-05 2020-10-05 2021-06-03 2020-10-19 desk computers for INE Statistical Development Quotations Envelope survey(Covid19 and Census) 75/G/PRCI/2021 / Acquisition of informatic Property Registration and Request for Single Stage - One IDA / V1240 Post Limited 85,000.00 0.00 Canceled 2021-05-29 2021-07-24 2022-01-20 equipment for COSSIL, DGRN Statistical Development Quotations Envelope and INE 73/G/PRCI/2021 / Acquisition of construction Strengthening Budget Pending Single Stage - One materials and equipment for IDA / D3080 Credibility, Tax Base and SOE Post Request for Bids Open - National 250,000.00 0.00 Implementati 2021-05-17 2021-05-22 2021-07-03 2021-08-02 2021-09-06 2022-03-05 Envelope VAT declaration center at Governance on Principe Island 74/G/PRCI/2021 / Pending Property Registration and Request for Single Stage - One Acquisition of complementary IDA / V1240 Post Limited 70,000.00 0.00 Implementati 2021-06-05 2021-07-31 2022-01-27 Statistical Development Quotations Envelope construction material for INE on 76/G/PRCI/2021 / Under Property Registration and Request for Single Stage - One Acquisition of remaining IDA / V1240 Post Limited 40,000.00 0.00 Implementati 2021-06-05 2021-05-12 2021-07-31 2022-01-27 Statistical Development Quotations Envelope informatic equipment for INE on Page 1 77/G/PRCI/2021 / Strengthening Budget Pending Request for Single Stage - One Acquisition of informatic IDA / V1240 Credibility, Tax Base and SOE Post Limited 22,000.00 0.00 Implementati 2021-06-06 2021-08-01 2022-01-28 Quotations Envelope equipment for COSSIL Governance on 78/G/PRCI/2021 / Pending Property Registration and Request for Single Stage - One Acquisition of Informatic IDA / V1240 Post Limited 23,000.00 0.00 Implementati 2021-06-13 2021-08-08 2022-02-04 Statistical Development Quotations Envelope equipment for DGRN on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 69/NC/PRCI/2020 / Pending Financial Soundness and Single Stage - One Acquisition of a Software for IDA / V1240 Post Request for Bids Open - International 700,000.00 0.00 Implementati 2021-05-24 2021-05-29 2021-07-10 2021-08-09 2021-09-13 2022-03-12 Access Envelope Bank Supervision on 79/S/PRCI/2021 / Integrated Financial Platform (Core Pending Financial Soundness and Single Stage - One Banking System & Accounting IDA / V1240 Prior Request for Bids Open - International 2,700,000.00 0.00 Implementati 2021-06-07 2021-06-12 2021-07-24 2021-08-23 2021-09-27 2022-03-26 Access Envelope System) for the Central Bank on of Sao Tome and Principe CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01/C/ICB/2017 / Asset Financial Soundness and Quality And Cost- IDA / D3080 Prior Open - International 1,000,000.00 1,509,906.03 Signed 2017-09-18 2017-09-21 2017-10-09 2017-09-26 2017-11-22 2018-02-13 2017-12-20 2018-03-30 2018-01-19 2018-04-27 2018-02-23 2018-09-14 2018-03-30 2018-08-31 2019-03-30 quality of the banking system Access Based Selection Consultant 02/C/ICB/2017 / Financial / Post Qualification Open - International 150,000.00 0.00 Canceled 2017-10-02 2017-10-23 2017-12-06 2018-01-05 2018-02-09 2018-08-08 usage survey Selection 13/C/ICB/2019 / Improvement of the Credit Financial Soundness and Quality And Cost- Registry Platform in the IDA / D3080 Prior Open - International 250,000.00 795,000.00 Signed 2019-01-28 2018-12-06 2019-02-18 2019-03-07 2019-04-03 2019-06-26 2019-05-01 2019-11-01 2019-05-31 2020-01-13 2019-07-05 2021-03-01 2019-08-09 2021-03-29 2020-08-08 Access Based Selection Central Bank of Sao Tome and Principe 03/C/ICB/2017 / Consultant Implementation of gap / Post Qualification Open - International 100,000.00 0.00 Canceled 2017-10-02 2017-10-23 2017-12-06 2018-01-05 2018-02-09 2018-08-08 assessment of public credit Selection registry 14/C/ICB/2019 / Financial Soundness and Quality And Cost- Pending Development of a Data Center IDA / D3080 Post Open - International 350,000.00 0.00 2020-03-02 2020-03-23 2020-05-06 2020-06-03 2020-07-03 2020-08-07 2020-09-11 2021-09-11 Access Based Selection Implementation for the Central Bank 29/C/ICB/2019 / Consultancy services to Financial Soundness and Quality And Cost- IDA / D3080 Post Open - International 250,000.00 232,710.00 Signed 2019-08-21 2019-07-26 2019-09-11 2019-10-10 2019-10-25 2020-02-18 2019-11-22 2020-04-30 2019-12-22 2020-10-22 2020-01-26 2021-04-07 2020-03-01 2021-03-23 2021-03-01 provide Technical Assistance Access Based Selection and training to OTOCA 49/C/ICB/2019 / Financial Strengthening Budget Quality And Cost- Auditing for the 4 State IDA / D3080 Credibility, Tax Base and SOE Post Open - International 200,000.00 200,526.52 Signed 2019-05-27 2019-07-15 2019-06-17 2019-08-07 2019-07-31 2019-10-01 2019-08-28 2020-02-14 2019-09-27 2020-02-14 2019-11-01 2020-05-24 2019-12-06 2020-05-25 2020-12-05 Based Selection Enterprises Governance 58/C/PRCI/2019 / Consultant Property Registration and Communication Service for IDA / V1240 Post Qualification Open - National 22,000.00 24,940.00 Signed 2019-10-08 2019-10-02 2019-10-29 2019-12-12 2019-12-03 2020-01-11 2020-03-05 2020-02-15 2020-03-11 2020-08-13 Statistical Development Enterprise Census Selection 18/C/ICB/2019 / Design of a D/R solution to guarantee Financial Soundness and Quality And Cost- Pending IDA / D3080 Post Open - International 350,000.00 0.00 2020-03-16 2020-04-06 2020-05-20 2020-06-17 2020-07-17 2020-08-21 2020-09-25 2021-09-25 Business continuity (module Access Based Selection Implementation 3) 61/C/ICB/2019 / DESENVOLVIMENTO DO Strengthening Budget Quality And Cost- Under SISTEMA INFORMÁTICO PARA IDA / V1240 Credibility, Tax Base and SOE Prior Open - International 950,000.00 0.00 2019-11-22 2019-12-16 2019-12-13 2020-01-15 2020-01-26 2020-05-27 2020-02-23 2020-07-30 2020-03-24 2020-11-16 2020-04-28 2020-06-02 2021-06-02 Based Selection Implementation A GESTÃO DO IMPOSTO Governance SOBRE VALOR ACRESCENTADO (IVA) 62/C/ICB/2019 / Project Project Implementation Least Cost Under IDA / V1240 Post Open - International 30,000.00 0.00 2019-11-25 2019-12-09 2019-12-16 2019-12-17 2020-01-29 2020-01-31 2020-02-26 2020-03-16 2020-03-27 2020-05-01 2020-06-05 2020-12-02 Audit for the years Support Selection Implementation 2019/2021 50/C/ICB/2019 / Development of Public Debt Strengthening Budget Consultant Pending Management System and IDA / D3080 Credibility, Tax Base and SOE Post Qualification Open - International 150,000.00 0.00 2019-08-26 2019-09-16 2019-10-30 2019-11-29 2020-01-03 2020-07-01 Implementation software solution for debt Governance Selection service forecast and reports 67/C/PRCI/2020 / Development of a procurement website for Strengthening Budget Consultant COSSIL (Gabinete de IDA / D3080 Credibility, Tax Base and SOE Prior Qualification Open - International 20,000.00 0.00 Canceled 2020-06-15 2020-07-06 2020-08-19 2020-09-18 2020-10-23 2021-04-21 Seguimento do Sistema de Governance Selection Licitação e Contratação Pública) 70/C/PRCI/2019 / Property Registration and Quality And Cost- Under IDA / D3080 Prior Open - International 500,000.00 0.00 2020-09-15 2020-09-25 2020-10-06 2020-11-19 2020-11-06 2020-12-17 2021-03-09 2021-01-16 2021-06-22 2021-02-20 2021-03-27 2022-03-27 Development of SIRP software Statistical Development Based Selection Implementation Consultant 32/C/ICB/2019 / Property Registration and IDA / D3080 Post Qualification Open - International 170,000.00 0.00 Canceled 2020-01-13 2019-11-29 2020-02-03 2020-01-15 2020-03-18 2020-04-17 2020-05-22 2020-11-18 Development of SIRP software Statistical Development Selection 68/C/PRCI/2020 / Development of a procurement website for Strengthening Budget Consultant COSSIL (Gabinete de IDA / D3080 Credibility, Tax Base and SOE Post Qualification Open - National 20,000.00 10,333.03 Signed 2020-09-21 2020-09-28 2020-10-12 2020-11-12 2020-11-25 2021-04-06 2020-12-25 2021-05-23 2021-01-29 2021-06-07 2021-07-28 Seguimento do Sistema de Governance Selection Licitação e Contratação Pública) Page 2 19/C/ICB/2019 / Development of a moveable Financial Soundness and Quality And Cost- Pending IDA / D3080 Post Open - International 700,000.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2023-01-09 asset electronic Collateral Access Based Selection Implementation Registry INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 05/C/ICB/2018 / Consultant Strengthening Budget services for project design of IDA / V1240 Credibility, Tax Base and SOE Post Direct Selection Direct 10,000.00 10,000.00 Completed 2018-02-21 2018-06-19 2018-03-03 2018-05-07 2018-02-26 2018-11-03 2020-02-21 VAT room and work Governance supervision Individual 06/C/ICB/2018 / CPI Property Registration and IDA / V1240 Post Consultant Limited 15,000.00 17,510.00 Completed 2018-04-12 2018-04-20 2018-04-17 2018-07-03 2018-05-08 2018-11-14 2018-06-12 2018-11-15 2018-12-09 2020-01-16 Specialist for INE Statistical Development Selection Individual 07/C/ICB/2018 / Poverty Property Registration and IDA / V1240 Post Consultant Limited 27,500.00 16,800.00 Signed 2018-04-05 2018-04-20 2018-04-10 2018-05-01 2018-08-15 2018-06-05 2018-08-27 2018-12-02 analysis Specialist for INE Statistical Development Selection Individual 08/C/ICB/2018 / Hiring of IT Property Registration and IDA / V1240 Post Consultant Limited 30,000.00 14,308.00 Completed 2018-02-22 2018-04-20 2018-02-27 2018-04-21 2018-03-20 2018-04-23 2018-04-24 2018-04-25 2018-10-21 2020-02-18 specialist for INE Statistical Development Selection 09/C/ICB/2018 / Technical Strengthening Budget Assistance to support the IDA / V1240 Credibility, Tax Base and SOE Post Direct Selection Direct 30,000.00 31,736.00 Completed 2018-03-08 2018-03-08 2018-03-18 2018-03-21 2018-05-22 2018-04-04 2018-11-18 2018-07-17 hiring of 25 new tax staff Governance 10/C/ICB/2018 / Preparation of the Operating, Project Implementation IDA / V1240 Post Direct Selection Direct 10,000.00 10,100.00 Completed 2018-03-01 2018-06-19 2018-03-11 2018-05-15 2018-06-27 2018-11-11 2020-02-19 administrative and financial Support Procedures Manual 31/C/ICB/2019 / Technical assistance to desegn and Property Registration and IDA / D3080 Post Direct Selection Direct 10,000.00 10,000.00 Completed 2019-02-22 2019-01-23 2019-03-04 2019-05-08 2019-01-31 2019-11-04 2020-02-19 quantify the materials nedeed Statistical Development for the INE rehabilitation 34/C/ICB/2019 / Technical Individual Property Registration and assistance to training 25 INE IDA / D3080 Post Consultant Limited 20,000.00 19,700.00 Completed 2019-03-15 2019-01-23 2019-03-20 2019-02-07 2019-04-10 2019-02-20 2019-05-15 2019-02-20 2019-11-11 2019-03-28 Statistical Development Staffs in multiple topics Selection 23/C/ICB/2019 / Design of Strengthening Budget Individual Under the 2019-2023 COSSIL IDA / D3080 Credibility, Tax Base and SOE Prior Consultant Open 50,000.00 0.00 2019-04-30 2019-06-18 2019-07-09 2019-08-13 2020-02-09 Implementation strategy and operatiopnal Plan Governance Selection 20/C/ICB/2019 / Introduction of a Individual Financial Soundness and Under methodologiy for IDA / D3080 Post Consultant Open 100,000.00 0.00 2019-04-26 2019-04-01 2019-06-14 2019-05-16 2019-07-05 2019-08-09 2019-08-09 2020-02-05 Access Implementation macroeconomic and revenue Selection forecsting 21/C/ICB/2019 / Updating of Strengthening Budget Individual a Public procurement law and IDA / D3080 Credibility, Tax Base and SOE Prior Consultant Open 150,000.00 147,142.45 Signed 2019-03-29 2019-05-06 2019-05-17 2020-01-16 2019-06-07 2020-05-11 2019-07-12 2020-04-27 2020-01-08 related documents Governance Selection 38/C/ICB/2019 / Post- Strengthening Budget graduation on Public IDA / D3080 Credibility, Tax Base and SOE Prior Direct Selection Direct 80,500.00 70,900.20 Signed 2019-02-25 2019-03-06 2019-03-07 2019-03-04 2019-05-11 2019-03-21 2019-11-07 Procurement for 7 COSSIL Governance staff 24/C/ICB/2019 / Training on Strengthening Budget logical architecture of the data IDA / D3080 Credibility, Tax Base and SOE Post Direct Selection Direct 88,000.00 61,380.00 Completed 2019-05-27 2019-04-18 2019-06-06 2019-04-22 2019-08-10 2019-05-03 2020-02-06 2019-08-14 center infrastructure for 7 Governance DITEI staff 25/C/ICB/2019 / T.A. to design the electronic interface Individual Financial Soundness and Pending between Treasury and Central IDA / D3080 Post Consultant Open 40,000.00 0.00 2019-11-25 2020-01-13 2020-02-03 2020-03-09 2020-09-05 Access Implementation Bank (Management Treasury Selection Module) 28/C/ICB/2019 / T.A. to Strengthening Budget Individual support issues regarding State IDA / D3080 Credibility, Tax Base and SOE Post Consultant Open 100,000.00 239,290.68 Signed 2019-05-27 2019-06-19 2019-07-15 2019-11-14 2019-08-05 2020-06-13 2019-09-09 2020-06-09 2020-03-07 Enterprises Governance Selection 40/C/ICB/2019 / T.A. on Strengthening Budget Property Registry, Commercial IDA / D3080 Credibility, Tax Base and SOE Post Direct Selection Direct 50,000.00 65,802.80 Signed 2019-10-28 2019-07-17 2019-11-07 2019-09-27 2020-01-11 2019-09-23 2020-07-09 and Notary new Codes Governance 41/C/ICB/2019 / T.A. for Individual Financial Soundness and Pending preparation of the Consumer IDA / D3080 Post Consultant Limited 19,110.00 0.00 2019-07-10 2019-07-15 2019-08-05 2019-09-09 2020-03-07 Access Implementation Price Index Selection 44/C/ICB/2019 / Elaboration Individual Financial Soundness and Pending of an information System IDA / D3080 Post Consultant Open 25,000.00 0.00 2019-10-24 2019-12-12 2020-01-02 2020-02-06 2020-08-04 Access Implementation Strategic Plan for INE Selection Individual 46/C/ICB/2019 / Senior Project Implementation IDA / D3080 Post Consultant Open 14,000.00 7,647.50 Signed 2019-04-26 2019-03-28 2019-06-14 2019-08-13 2019-07-05 2019-08-14 2019-08-09 2019-08-14 2020-02-05 Administrative for AFAP Support Selection Individual 47/C/ICB/2019 / Accountant Project Implementation IDA / D3080 Post Consultant Open 14,000.00 21,000.00 Signed 2019-09-26 2019-09-16 2019-11-14 2019-11-19 2019-12-05 2020-01-07 2020-01-09 2020-01-07 2020-07-07 for AFAP Support Selection 48/C/ICB/2019 / Design, Individual architecture project and work Project Implementation IDA / D3080 Post Consultant Open 10,000.00 9,411.06 Completed 2019-04-30 2019-03-26 2019-06-18 2019-04-04 2019-07-09 2019-04-05 2019-08-13 2019-04-08 2020-02-09 2020-04-07 supervision of the 3rd floor Support Selection for AFAP Offices Page 3 27/C/ICB/2019 / T.A. to Strengthening Budget Individual Pending create a Communication IDA / D3080 Credibility, Tax Base and SOE Post Consultant Limited 35,000.00 0.00 2019-10-23 2019-10-28 2019-11-18 2019-12-23 2020-06-20 Implementation Strategy for VAT Governance Selection Strengthening Budget Individual 51/C/ICB/2019 / T.A. to Pending IDA / D3080 Credibility, Tax Base and SOE Post Consultant Open 15,000.00 0.00 2019-10-28 2019-12-16 2020-01-06 2020-02-10 2020-08-08 design a Manual for VAT Implementation Governance Selection 45/C/ICB/2019 / T.A. for the Individual Financial Soundness and organization of enterprises IDA / D3080 Post Consultant Open 40,000.00 29,497.00 Signed 2019-10-10 2019-08-29 2019-11-28 2019-11-27 2019-12-19 2020-01-07 2020-01-23 2020-01-07 2020-07-21 Access Census Selection 57/C/PRCI/2019 / Individual Accounting training for Property Registration and Under IDA / V1240 Post Consultant Open 10,000.00 0.00 2019-10-08 2019-10-14 2019-11-26 2019-12-17 2020-01-21 2020-07-19 Inquisitors on Enterprise Statistical Development Implementation Selection Census 56/C/PRCI/2019 / Technical Project Implementation IDA / V1240 Post Direct Selection Direct 38,478.00 0.00 Canceled 2019-10-03 2019-10-13 2019-12-17 2020-06-14 Advisor for PRCI Support 55/C/PRCI/2019 / Financial Project Implementation IDA / V1240 Post Direct Selection Direct 38,478.00 0.00 Canceled 2019-10-03 2019-10-13 2019-12-17 2020-06-14 Manager Support 59/C/PRCI/2019 / Technical Project Implementation IDA / V1240 Post Direct Selection Direct 38,478.00 38,478.00 Signed 2018-12-03 2018-12-30 2018-12-13 2019-01-01 2019-01-22 2019-01-02 2020-01-22 Advisor for PRCI Support 60/C/PRCI/2019 / Financial Project Implementation IDA / V1240 Post Direct Selection Direct 38,478.00 38,478.00 Signed 2018-12-03 2019-12-02 2018-12-13 2019-01-02 2019-01-07 2019-01-03 2020-01-07 Manager Support 43/C/ICB/2019 / Preparation Strengthening Budget Individual Under of Roadmap for updating IDA / D3080 Credibility, Tax Base and SOE Post Consultant Open 25,000.00 0.00 2019-12-09 2021-06-14 2020-01-27 2020-02-17 2020-03-23 2020-09-19 Implementation National Accounts Governance Selection 33//C/ICB/2019 / Technical Individual Property Registration and assistance to training 10 INE IDA / D3080 Post Consultant Limited 21,000.00 0.00 Canceled 2020-03-16 2020-03-21 2020-04-11 2020-05-16 2020-11-12 Statistical Development staff in STATA Selection 11/C/AFAP/2020 / Senior Accountant Project Implementation IDA / V1240 Post Direct Selection Direct 30,000.00 30,000.00 Signed 2020-02-13 2019-12-02 2020-02-23 2020-01-02 2020-04-28 2020-01-03 2020-10-25 Nilza Maria de Jesus Costa Support Nazaré 63/C/PRCI/2020 / 5 ASSISTENTES PARA APOIAREM A DGRN NO PROCESSO DE Property Registration and Under DIGITALIZAÇÃO E IDA / V1240 Post Direct Selection Direct 20,000.00 0.00 2020-02-23 2020-02-27 2020-03-04 2020-04-02 2020-05-08 2020-11-04 Statistical Development Implementation CATALOGAÇÃO DOS LIVROS DA SECÇÃO PREDIAL E AUTOMÓVEL 64/C/ICB/2020 / T.A. to Design Public Debt Individual Financial Soundness and Management System and IDA / V1240 Post Consultant Open 60,000.00 96,000.00 Signed 2020-03-09 2020-04-01 2020-04-27 2020-11-16 2020-05-18 2021-04-09 2020-06-22 2021-04-20 2020-12-19 Access software solution for debt Selection service forecast and reports 65/C/ICB/2020 / Training on Individual System, Comunication and Financial Soundness and IDA / V1240 Post Consultant Open 40,000.00 16,408.58 Signed 2020-03-02 2020-02-24 2020-04-20 2020-07-22 2020-05-11 2020-07-16 2020-06-15 2021-01-25 2020-12-12 Infomatic Security (Fortigate Access Selection and Storage) for DITEI Staff 30/C/ICB/2019 / T.A. to Individual assist on preparation of ToR Financial Soundness and IDA / D3080 Post Consultant Limited 80,000.00 0.00 Canceled 2019-05-31 2019-06-05 2019-06-26 2019-07-31 2020-01-27 for SIRP design and LEGI-NON Access Selection integration and solution 22/C/ICB/2019 / Strengthening Budget Individual Development of a IDA / D3080 Credibility, Tax Base and SOE Prior Consultant Open 20,000.00 0.00 Canceled 2019-04-05 2019-05-24 2019-06-14 2019-07-19 2020-01-15 procurement website for Governance Selection COSSIL 72/C/PRCI/2021 / Training Individual Financial Soundness and Pending of INE staff and delegated IDA / D3080 Post Consultant Limited 25,000.00 0.00 2021-10-11 2021-10-16 2021-11-06 2021-12-11 2022-06-09 Access Implementation body on data anonymization Selection 42/C/ICB/2019 / T.A. for Individual training of 10 INE staff and Financial Soundness and IDA / D3080 Post Consultant Open 25,000.00 0.00 Canceled 2019-08-22 2021-02-19 2019-10-10 2019-10-31 2019-12-05 2020-06-02 delegated body on data Access Selection anonymization 80/C/PRCI/2021 / Individual Financial Soundness and Pending Development of Informatic IDA / V1240 Prior Consultant Open 200,000.00 0.00 2021-05-31 2021-07-19 2021-08-09 2021-09-13 2022-03-12 Access Implementation system for Debt management Selection Page 4 FINAL GEWEL PROCUREMENT PLAN Date of this revision: May 26, 2016 Zambia Girls Education and Women’s Empowerment (GEWEL) Project. (Project ID No P151451) 1. General: The project development objective (PDO) is to support the Government of Zambia to increase access to livelihood support for women and access to secondary education for disadvantaged adolescent girls in extremely poor households in selected districts. The Project consists of the following three components: Component 1. Supporting Women's Livelihoods(US$36 million) The objective of this component is to provide them with access to opportunities that will increase the productivity of their livelihood activities and their economic empowerment. Component 2. : Keeping Girls in School (US$25.78 million) The objective of this component is to support adolescent girls in extremely poor households to access secondary education. Component 3. Institutional Strengthening and Systems Building (US$3.22 million) The main objectives of this component is to strengthen institutional capacity and build systems to increase efficiency and improve coordination of targeted programs. 2. Project ID No:P151451 3. Project Implementing Agencies: Component 1: Ministry of Community Development and Social Welfare (MCDSW) Component 2: Ministry of Education, Science Vocational Training and Early Education (MGE) Component 3: Ministry of Gender (MOG); and MCDSW 4. Bank’s approval Date of the Procurement Plan: April 10, 2015 5. Date of General Procurement Notice: April, 2014, revised August 13, 2015 6. Period covered by this Procurement Plan: September 2015 to February 2017 I. Goods and Works and Non-Consulting Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by IDA as stated in Appendix 1 to the Guidelines for Procurement: Table 1: Thresholds for Procurement Methods and Prior Review Goods, Works and Non Consultant Services Expendit Procurement Method Contract Value Contracts Subject to ure Threshold For use of Prior Review (US$) Category Method (US$) 1 1. Works ICB (Works/Supply & >=10,000,000 All contracts Installation) NCB >=200,000 - As in procurement <10,000,000 plan Shopping <200,000 None Direct Contracting All values All contracts 2. Goods ICB >=2,000,000 All contracts NCB >=100,000 <2,000,000 As in procurement plan Shopping <300,000 (motor None vehicles only) Shopping <100,000 000 (rest not None motor vehicles) Direct Contracting All values All contracts Procurement from All values None UNOPS Agency Note: Contracts with a cost estimate below US$300,000 for motor vehicles only may be procured on basis of Shopping procurement method 2. Prequalification. N/A 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines). N/A 4. Reference to (if any) Project Operational/Procurement Manual: The components will besides provisions of the Banks Guidelines for Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers, dated January 2011, revised April 2014 and the Banks Guidelines Procurement of Goods, works, and Non-Consulting Services under IDRD Loans and IDA Credits & Grants by World bank Borrowers, dated January 2011, revised April 2014 and will also make use of the additional information and guidance provided in Manual – Guidance for Procurement of Small Contracts; World Bank Africa Region Procurement February 2011, revised March 2014 and in the case of all contracts entered into using NCB based on use of National standard Bidding Documents, additional provisions of the attachments and standard clauses of the Bank’s Policy – Corrupt and Fraudulent Practices whose text may not be modified will be used in both the bidding documents and the ensuing contracts. 5. Any Other Special Procurement Arrangements. None 6. Procurement Packages with Methods and Time Schedule. Procurement of Good and Non Services Do Comme me nts Pre Expecte Packa sti Prior Expected Est Proc q d ge Plan/ c or Contract Descripti Amount Bid Actu Pr Post Signatur on in Metho (yes Openin Numb al ef Revie e US $ d / g er er w Date no) Date en ce 2 Component 1: Supporting Women's Livelihoods(Ministry of Community Development and Social Welfare) Printing of MCDS Plan NCB No No Post Feb April 2016 May teaching W/NCS/ 448,300 2016 require and 001 Actua to split learning l between materials MCDS Plan 1,255,000 NCB No No Prior Nov Feb 2016 Purchase W/NCS/ 2015 of motor 002 Actua vehicles l MCDS Plan Aug Aug 2016 550,000 Prior W/NCS/ Procure 2016 003 Actua ment l from UN Yes No Agenci Purchase es of motor (UNOP vehicles S) MCDS Plan NCB No No Post Nov Feb 2016 230,000 Purchase W/NCS/ 2015 of Motor 004 Actua Bikes l MCDS Plan Shoppi No No Post Nov Feb 2016 16,000 W/NCS/ ng 2015 Purchase 005 Actua of Bicycles l MCDS Plan Shoppi No No Post Nov Feb 2016 82,000 W/NCS/ ng 2015 006 Actua Purchase l of Boats Purchase MCDS Plan 100,000 Shoppi No No Post Mar Apr 2016 of Various W/NCS/ ng 2016 Office 007 Actua Furniture l and Equipment for H/Q and Districts Computers MCDS Plan March May 2016 Needed 281,300 Post , Laptops, W/NCS/ 2016 for the Scanners, 008 Actua SWL Printers, l NCB No No operatio Projectors, ns Cameras, UPS Launching Plan 535,000 Post April 2016 and Actua Equipment MCDS NCB No No l for W/NCS/ operation 009 3 of GRS Equipment MCDS Plan April June 2016 200,000 Post for ICT- W/NCS/ 2016 based 010 Actua NCB No No learning l tools Developm MCDS Plan 120,000 Post Jan 2016 June 2016 ent of W/NCS/ Actua software 011 l and database for real- time NCB No No registratio n of SWL beneficiari es and monitoring of activities. Sub Total Component 1; Goods and Non 3,817,600 Consultant Services Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education ) Purchase MGE/G/ Plan 60,000 Shoppi No No Post Jan 2016 Feb 2016 Hand of Laptops, 01 ng held Tablets Actua devices and l for the Routers Impleme ntation of the model to capture real-time informati on in the field. IT MGE/G/ Plan 100,000 Shoppi No No Post Jan 2016 March (includin Equipment 02 ng 2016 g Actua compute l rs and other IT equipme nt) Vehicles MGE/G/ Plan Shoppi Nov Jan 2016 250,000 No No Post for 03 ng 2015 selected 4 districts Actua l Component 2. Keeping Girls in School (Ministry of Community Development ) Procureme MCDS Plan Shoppi Nov Jan 2016 37,500 No No Post nt of W/NCS/ ng 2015 Project 001 Actua Vehicle l Sub Total Component 2; Goods and Non 447,500 Consultant Services Component 3 (a): Institutional Strengthening and Systems Building: (Ministry of Gender) Setting up MOG/G Plan Shoppi No No Post Jun 2016 July 2016 IT /01 100,000 ng infrastruct Actua ure for l M&E in MOG vehicle for MOG/G Plan 50,000 Shoppi No No Post Nov Jan 2016 training, /02 ng 2015 and M&E Actua l Purchase MOG/G Plan 40,000.00 Shoppi No No Post Jun, July, 2016 of IT /03 ng 2016 Equipment Actua (Laptop l Computer, Desk top Computers , LAN, Camera, Projector and other IT Equipment s Purchase MOG/0 Plan 3,000 Shoppi No No Post Jun, July, 2016 of Office 4 ng 2016 Furniture Actua l Sub Total Component 3 A- Goods and Non 193,000 Consultant Services Component 3 (b) Institutional Strengthening and Systems: (Ministry of Community Development and Social Welfare) IT MCDS Plan 400,000 NCB No No Post Aug Dec 2015 Infrastruct W/G/01 2016 ure for Actua informatio l n systems 5 for MCDSW business at various levels Hardware MCDS Plan 150,000 NCB No No Post Nov Jan 2017 and W/G/02 2016 Software Actua for unique l identificati on solution Procureme MCDS Plan 60,000 Shoppi No No Post May June 2016 nt of W/G/03 ng 2016 devices for Actua field and l identificati on of beneficiari es Purchase MCDS Plan 100,000 Shoppi No No Post May July 2016 Goods of office W/G/04 ng 2016 for the furniture Actua National and l Social equpment Protectio n Co- ordinatio n Unit Purchase MCDS Plan 150,000 Shoppi No No Post July July 2016 For of Motor W/G/05 ng 2016 National Vehicles Actua Co- for l dination, National M&E and Social MIS. Protection Co- ordination Unit Sub Total Component 3 (b) : Goods and Non 860,000 Consultant Services Procurement of Works Sub Component 1: Supporting Women's Livelihoods(Ministry of Community Development and Social Welfare) MCDS Plan Shoppi No No Post Oct Oct 2016 45,000.00 Office W/W/0 ng 2016 refurbish 01 Actual ment Sub Component 3(b): Institutional Strengthening and Systems: (Ministry of Community Development and Social Welfare) Support to MCDS Plan 70,000 Shoppi No No Post Aug Aug 2016 office W/G/02 ng 2016 6 refurbish Actual ment Component 3 a). Institutional Strengthening and Systems: (Ministry of Gender ) Partitionin MOG/ Plan 2,000 Shoppi No No Post Sep Sep 2016 g of the W/01 ng 2016 Foyer for Actual the Conferenc e Room Sub Total: Works 127,000 II. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Table 2: Thresholds for Consultants Selection Methods and Prior Review Contract Value Contracts Subject Expenditure Procurement Threshold for use of to Prior Review Category Method selection method (US$ millions) (US$) QCBS, QBS >=200,000 All contracts Consulting As in procurement CQS, LCS, QBS, FBS <200,000 Firms plan SSS All values All Contracts Individual Competitive selection >=100,000 All contracts Consultants IC Single Source (IC) All values All contracts Selection NOTE: Contracts selected on basis of CQS should not exceed US$200,000 equivalent. Note: Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Engineering and contract management contracts with cost estimates of less than US$300,000 may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. The procurement plan will indicate those contracts using CQS whose short lists by exception may not comprise entirely national firms. Terms of Reference (TOR) for all consultancy contracts as well as all single source selections, irrespective of the contract value, will be subject to prior review. Any Other Special Selection Arrangements: N/A 2. Consultancy Assignments with Selection Methods and Time 1 2 3 4 5 6 7 7 Expected Prior Plan Estimate proposal Selecti / Ref. / d submissio Description on Post Comments No. Actu Cost in n Method Revie al US$ /opening w Date Component 1: Supporting Women’s Livelihoods(Ministry of Community Development and Social Welfare) Adoption and Roll-out of SWL sub component 1(a) MCDSW/ Survey Plan March 937,500 C/001 Enumeration of 2016 SWL beneficiaries Actua QCBS Prior l MCDSW/ Information, Plan CQS 200,000 Post May 2016 C/002 education and communications Actua outreach at local l and national level Service provider to Plan 845,000 Jan 2016 MCDSW/ pay productivity Actua QCBS Prior C/003 grants to l beneficiaries Sub-component 1b – Building National Implementation and Monitoring Capacity MCDSW/ Plan 112,500 Prior April 2016 C/004 Hiring of SWL Actua Contract Duration IC manager l is 24 Months MCDSW/ Plan IC 97,500 Post April 2016 C/005 Hiring of SWL M&E Actua Contract Duration Specialist l is 24 Months 97,500 April 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/006 Contract Duration M&E Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 97,500 Post Nov 2015 C/007 Contract Duration ICT Specialist Actua is 24 Months l July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/008 Contract Duration ICT Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/009 Contract Duration Program Officer Actua is 24 Months 89,100 July 2016 l 8 MCDSW/ Plan IC 89,100 Post Nov 2015 C/010 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/011 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/012 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 89,100 Post Nov 2015 C/013 Contract Duration Program Officer Actua is 24 Months l 89,100 July 2016 MCDSW/ Plan IC 97,200 Post April 2016 C/014 Program Contract Duration Actua Accountant is 24 Months l 97,200 April 2016 MCDSW/ Assistant Plan IC 77,760 Post Nov 2015 C/015 Accountant Contract Duration Actua is 24 Months l 77,760 July 2016 MCDSW/ Plan Notes: assignment QBS 1,300,000 Prior May 2016 C/016 will include Actua finalizing SWL l training curriculum, design of communications strategy for Consultancy to outreach support roll out and awareness raising implementation of and support for SWL implementation of SWL activities (Short list will comprise for profit and not for profit firms i.e. Private sector and NGOs hence use of QBS) MCDSW/ Design of and Plan CQS 90,000 Post Jan 2016 C/017 operational guidelines for Actua targeting and l identification of 9 SWL beneficiaries MCDSW/ Development of Plan CQS 120,000 Post Jan 2016 C/018 strategy and tools for SWL GRS, and Actua support to launch l and operate the GRS MCDSW/ Plan IC 60,000 Post June 2016 C/019 Strategy for harmonization of Actua MCDSW l empowerment/liveli hood programs MCDSW/ Plan January Implementation QCBS 200,000 Post C/020 2017 evaluation and Actua beneficiary l satisfaction survey MCDSW/ Plan QCBS 1,030,000 Prior June 2016 C/021 Impact evaluation data collection Actua l Sub Total Component 1; Consulting 5,702,06 Services 0 Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education ) Assessment for the Plan IC 45,000 Post Sept 2015 MGE/C/0 identification of 01 technological Actua innovations l MGE/C/0 Development of a Plan IC 50,000 Post Dec 2015 02 beneficiary awareness strategy Actua for Keeping Girls in l School MGE/C/0 Design of Plan QCBS 200,000 Prior Jan 2016 03 Complaints & Grievance Mechanism for the Actua Keeping Girls in l School Initiative MGE/C/0 Plan CQS 60,000 Post Sept 2016 04 Actua TA to harmonize existing bursary l and assessment, strategy MGE/C/0 Support to Plan CQS 51,000 Post March 05 implement the 2017 action plan to harmonize existing 10 secondary school Actua support schemes l MGE/C/0 Information System Plan QCBS 500,000 Prior February 06 Module, 2016 Development of the software to capture real time information in the field and testing of Real time Data Sub Total Component 2: Consulting Actual 906,000 Services Component 3 (a). Institutional Strengthening and Systems Building: (Ministry of Gender) MOG/C/ Development of a Plan CQS 50,000 Post Oct 2015 01 monitoring Actua framework l MOG/C/ Development of Plan CQS 100,000 Post Jun 2016 02 software for a M&E Actua and evaluation l system MOG/C/ Technical Plan CQS /IC 100,000 Post Sept 2015 Various over the 03 assistance to the life of the project. National Secretariat Actua Activity may be for project l split when defined management Sub Total Component 3(a): 250,000 Consulting Services Component 3 (b). Institutional Strengthening and Systems Building: (Ministry of Community Development and Social Welfare MCDS Development of M&E Plan CQS 150,000 Prior Aug 2015 W/C/01 framework Actua l MCDS Development of a Plan QCBS 350,000 Prior July 2016 W/C/02 MIS module for SWL and non formal Actua Literacy l MCDS Enhancement of Plan CQS 150,000 Prior Jan 2017 W/C/03 MIS/SRB Actua l MCDS Update the training Plan IC 20,000 Post March W/C/04 strategy for MCDSW 2016 staff in M&E and Actua develop a strategy l 11 for capacity development in policy analysis MCDS Updating Operations Plan CQS 100,000 Post Dec 2015 W/C/05 Manuals Actua l MCDS Assessment of Actua CQS 100,000 Post Jul 2016 W/C/06 options to l identifying Plan beneficiaries of NRCs, MCDS Inventory of existing Plan CQS 40,000 Jan 2016 W/C/07 complimentary Post activities Actua l MCDS Software design and Actua CQS 150,000 Feb March W/C/08 implementation l Post Plan MCDS TA to National Plan IC 40,000 Post Oct 2016 W/C/10 Social Protection Co- Various TA Actua ordination Unit, l MCDS Development of a Plan IC 15,000 Post Jan 2016 W/C/9 strategy for good Actua practice l Sub Total Component 3 (b): 1,115,00 Consulting Services 0 III. Training, workshops and consultations Estimated Ref. Training, workshop Estimated Expected Duration No. and study tours Cost (US$) Training/workshop (Days) Component 1: Supporting Women’s Livelihoods(Ministry of Community Development and Social We Sub-component 1a – Adoption and Roll-out of SWL MCDSW/T/01 Training of Trainers (ToT) 2,416,000 Recurrent (July 2016; Ju workshop 2017; July 2018) MCDSW/T/02 1,172,000 Recurrent (July-Feb 201 Training of beneficiaries in life, July-Feb 2017/8; July-Fe business and savings 2018/9) 12 MCDSW/T/03 Training of beneficiaries in agri- 186,000 Recurrent (Sept-Feb 20 business and other sector- Sept-Feb 2017/8; Sept-F specific topics 2018/9) MCDSW/T/04 Recurrent (September 2 Provision of safe space for September 2017; Septe training and follow-up meetings 375,000 2018) MCDSW/T/05 Launching and operation of GRS 735,000 Recurrent MCDSW/T/06 Launching and operation of ICT- Recurrent (August 2016 based learning tools 325,000 August 2017, August 20 MCDSW/T/07 Launching and Equipment for operation of GRS 100,000 MCDSW/T/08 Launching and operation of ICT- based learning tools 125,000 Sub-component 1b – Building National Implementation and Monitoring Capacity MCDSW/T/009 Workshop for preparation of the March 2016 Operations Manual 20,000 MCDSW/T/010 Training of DCD staff on POM Recurrent and training curriculum 60,000 MCDSW/T/11 Training of DCD staff on Recurrent (August 2016 beneficiary enumeration and August 2017; August 20 registration 50,000 MCDSW/T/12 Training of DCD staff on Recurrent (August 2016 monitoring and reporting 50,000 August 2017; August 20 MCDSW/T/13 Recurrent (March 2017; Annual review 30,000 2018; March 2019) MCDSW/T/14 Training of HQ and district staff Recurrent (April-August training prior to SWL activities 270,000 2017, 2018) MCDSW/T/15 Study tours to learn from international experience in the implementation of livelihood support programs 100,000 MCDSW/T/16 Capacity Building of SWL Staff in January 2017 Bank Procurement and regulations and implementation 150,000 Institutional Strengthening and Systems Building MCDSW/T/14 South-south exchange on social 35,000 May 2016 protection policy and implementation issues. Sub Total Training , Workshops and Capacity 6,199,000 Building Component 1 Supporting Women’s Livelihoods(Ministry of Community Development and Social Welfare Component 2. Keeping Girls in School (Ministry of Education, Science Vocational Training and Early Education) Sub-component 2b - System Strengthening and Consolidation Training Plan for MGE to implement the Keeping Girls in MGE /T/01 School initiative 40,000 March 2016 to May 201 13 MGE /T/02 Training of staff as per the training plan 135,000 Feb 2017 MGE /T/03 Training of the primary users of the Keeping Girls in School Information System Module 25,000 Dec 2015 MGE /T/04 Workshops and consultations for the action plan. 20,000 Feb 2017 MGE /T/05 South-south exchange on Keeping Girls in School initiative. 70,000 Dec 2016 MGE /T/06 Sharing of lessons learned between district officers 124,000 June 2016 – Sept 2020 Sub Total Training , Workshops and Capacity 414,000 Building Component 2 Subcomponent 2c: - System Strengthening for MCDSW to support Keeping Girls in School Initiativ MCDSW/T/15 Trainers of Trainers 100,000 November 2015 workshop for District Social Welfare Officers to train officers in the implementation of the Project MCDSW/T/16 Awareness raising and 25,000 November – December sensitization of Community onwards Welfare Assistance Committees (CWACs) MCDSW/T/17 Conduct inception visits to 65,000 December 2015 respective Districts and communities for programme buy-in particularly from traditional leaders, District Government officials and other stake holders. MCDSW/T/18 Hold a workshop to develop 10,000 November 2015 protocols for the implementation of the programme MCDSW/T/19 Verification of Girls on the 70,000 December 2015 list (Headcount) both in communities and villages. MCDSW/T/20 Quality Assurance, 130,000 March 2016 onwards Monitoring and mentoring of girls in school MCDSW/T/21 Follow up on girls in school 100,000 January 2016 by the CWACs, Districts, Provincial offices and Headquarters. MCDSW/T/22 Monitoring and supervision 171,250 March 2016 of follow up outcomes by the districts, provincial offices and Headquarters 14 MCDSW/T/23 Hold community validation 71,250 December 2015 meetings to provide feedback on enlisted girls Sub Total Subcomponent 2c 742,500 System Strengthening for MCDSW to support Keeping Girls in School Initiative Component 3 a). Institutional Strengthening and Systems: (Ministry of Gender ) MOG /T/01 Training of the primary users 50,000 Sept 2016 – March 2 of the monitoring and evaluation system in MOG MOG /T/02 Competency-based training 70,000 in co-ordination skills, gender analysis and gender mainstreaming June 2016 – Dec 20 MOG /T/03 Learning exchange on 70,000 empowerment programs March 2016 – May 2 MOG /T/04 Short-course local training of 4,000 staff in Project Management- 4 Staff Jan 2016 – June 20 MOG /T/05 Regional staff training in 28,000 impact evaluation • Master of Arts in Economic Policy Management – 2 Staff • Advanced M & E; Integrating Planning, Implementation, Budgeting, M&E-2 Staff • Project Management – 3 Staff Jan 2016 – Dec 20 MOG /T/06 Training of at least 10 65,000 district gender sub- committees per province in all 10 provinces in national provincial centres Jan 2016- Dec 201 MOG/T/07 Competency-based training 20,000 in Women Economic Entrepreneurship skills Nov - Dec 2016 Sub Total Training , Workshops and Capacity 327,000 Building Component 3(a) Component 3 a). Institutional Strengthening and Systems: (Ministry of Community Development ) MCDSW/T/01 Training and support for 90,000 Jun 2016 – Dec 2019 capacity development in line with training strategy for senior, middle-level and operational staff in MCDSW 15 MCDSW/T/02 Training of the primary users 10,000 May 2017 – Aug 2017 of the unique identification solution Sub Total Training , Workshops and Capacity Building Component 3(a) 100,000 GENERAL NOTES 1. Training and capacity building: The institutions charged with implementation responsibility for the componentswill identify the total cost of required training and prepare and submit to the Bank, for its prior review, a detailed training program. The training program will, inter alia, identify: (i) the training envisaged; (ii) the justification for the training, how it will lead to effective performance and implementation of the project (iii) the personnel to be trained; (iv) the selection methods of institutions or individuals conducting such training; (v) the institutions which will conduct training, if already selected; (vi) the duration of proposed training; and (vii) the cost estimate or specified cost of the training. Preparation and submission of a report, including to the Bank by the trainee upon completion of training would be mandatory. 2. Operating costs: For this project, the Bank has agreed with the implementing agencies of the various components that the procurement methods for works, goods and non-consulting services as described in the Procurement Guidelines do not have to be followed for payments made for operating costs arising from the implementation of the project. Instead, the Bank has assessed the Governments and other implementing agency own procurement and administrative procedures for these expenditures (during appraisal) and agrees that these procedures are adequate for procuring items for operating costs. The operating costs constitute recurrent costs (excluding purchase of motor vehicles, computers etc.) and typically include equipment rental and maintenance, vehicle operating costs, maintenance and repair, office rental and maintenance, office materials and supplies, utility costs (including electricity, water and gas) communications (including telephone and internet charges) equipment rent, operation and maintenance and cost of banking services (bank charges), travel cost and transport of the staff associated with project implementation. The Project Appraisal Document (PAD) and the Financing Agreement (FA) will include a list of the eligible items to be covered under the project. These items will be procured using the implementing Government agency’s administrative procedures, which have been reviewed and found acceptable to the Bank. Contracts for these items should not be included in the procurement plan. 16 PROCUREMENT Zambia : Girls Education and Womens Empowerment and Livelihood Project PLAN General Information Country: Zambia Bank’s Approval Date of the Original Procurement Plan: 2016-11-17 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151451 GPN Date: Project Name: Girls Education and Womens Empowerment and Livelihood Project Loan / Credit No: IDA / 56580 Ministry of General Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Under MESVTEE/G/06 / Vehicles for Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 250,000.00 16,000.00 Implementati 2015-12-23 2016-12-09 2017-06-07 selected Districts Quotations Envelope on MESVTEE/G/05 / IT Under Equipment (including Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 100,000.00 0.00 Implementati 2015-11-20 2016-11-01 2016-12-01 2017-05-30 computers and other IT Quotations Envelope on Equipments) MOGE/G/01/17 / Request for Single Stage - One PROCUREMENT OF MOTOR IDA / 56580 Keeping Girls in School Post Limited 95,000.00 0.00 Canceled 2017-07-01 2017-08-26 2018-02-22 Quotations Envelope BIKES MESVTEE/G/04 / Hand held devices for the Request for Single Stage - One implementation of the model IDA / 56580 Keeping Girls in School Post Limited 60,000.00 0.00 Canceled 2016-11-26 2017-01-21 2017-07-20 Quotations Envelope to capture real time information in the field. MOGE/G/001/17 / Under Procurement of IT Equipment Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 89,000.00 0.00 Implementati 2017-11-20 2019-04-01 2017-12-26 2017-12-29 for the Management Quotations Envelope on Information System. MOGE/003/2017 / UN Agencies Procurement of sixteen (16) IDA / 56580 Keeping Girls in School Post Direct 800,000.00 515,020.83 Completed 2017-11-27 2017-12-02 2018-05-14 2018-01-06 2018-06-01 2018-02-28 2018-12-12 (Direct) Motor Vehicles MOGE/G/07/17 / Request for Single Stage - One Procurement of three (03) IDA / 56580 Keeping Girls in School Post Limited 30,000.00 0.00 Canceled 2017-11-27 2017-12-28 2018-01-08 Quotations Envelope Engine Boats MOGE/005/2017 / Request for Single Stage - One Procurement of three (03) IDA / 56580 Keeping Girls in School Post Limited 30,000.00 0.00 Canceled 2017-12-02 2018-01-27 2018-01-30 Quotations Envelope engine boats MOGE/006/2017 / Request for Single Stage - One Procurement of motor vehicle IDA / 56580 Keeping Girls in School Post Limited 14,000.00 0.00 Canceled 2017-11-20 2017-12-25 2017-12-29 Quotations Envelope canopies MOGE/G/04/2018 / Request for Single Stage - One Procurement of T.Shirts for IDA / 56580 Keeping Girls in School Post Limited 16,336.12 0.00 Canceled 2018-06-08 2018-08-03 2018-08-30 Quotations Envelope National Events MOGE/G/03/2018 / Under Request for Single Stage - One Procurement of 3 engine IDA / 56580 Keeping Girls in School Post Limited 90,000.00 0.00 Implementati 2019-04-03 2019-05-29 2019-06-27 Quotations Envelope boats on ZM-MOGE-141343-GO-RFQ / Procurement of 5000 Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 96,154.00 109,452.60 Signed 2019-11-15 2019-11-04 2020-01-10 2019-12-16 2020-07-08 Suggestion Boxes with Quotations Envelope Complete Pad Locks MOGE/G/002/2020 / Pending Single Stage - One Procurement of COVID-19 IDA / 56580 Keeping Girls in School Post Request for Bids Open - National 288,440.00 0.00 Implementati 2020-09-13 2020-09-18 2020-10-30 2020-11-29 2021-01-03 2021-07-02 Envelope Personal Protective Materials on MOGE/G/001/20 / Supply and Delivery of 93626 Washable/Re-usable Face Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 89,810.23 90,359.94 Signed 2020-11-22 2020-09-14 2021-01-17 2020-10-14 2021-07-16 Masks for Central, Eastern, Quotations Envelope Luapula, Muchinga and Northern Provinces MOGE/G/002/20 / Supply and Delivery of 85200 Washable/Re-usable Face Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 76,222.67 76,689.20 Signed 2020-11-22 2020-09-14 2021-01-17 2020-10-14 2021-07-16 Masks for Copperbelt, Lusaka, Quotations Envelope North-western, Western and Southern Provinces MOGE/G/003/2020 / Supply Request for Single Stage - One and Delivery of 965 Infrared IDA / 56580 Keeping Girls in School Post Limited 86,332.01 86,860.42 Signed 2020-11-22 2020-09-14 2021-01-17 2020-10-14 2021-07-16 Quotations Envelope Thermometers MOGE/G/004/2020 / Supply Request for Single Stage - One and Delivery of 9650 Hand IDA / 56580 Keeping Girls in School Post Limited 28,537.52 28,712.19 Signed 2020-11-22 2020-09-14 2021-01-17 2020-10-14 2021-07-16 Quotations Envelope Wash Liquid Soap MOGE/G/005/2020 / Supply Request for Single Stage - One and Delivery of 1930 Portable IDA / 56580 Keeping Girls in School Post Limited 62,350.90 62,732.53 Signed 2020-11-23 2020-09-14 2021-01-18 2020-10-14 2021-07-17 Quotations Envelope Hand Washing Station Page 1 MOGE/G/001/2020 / Pending Procurement of Self-guided IDA / 56580 Keeping Girls in School Post Direct Selection Direct 211,814.00 0.00 Implementati 2020-11-30 2020-12-05 2021-01-09 2021-07-08 Study Kits on MOGE/G/001/2021 / Supply and delivery of 2328 Pending Request for Single Stage - One Complaint Boxes with Locks IDA / 56580 Keeping Girls in School Post Limited 31,040.00 0.00 Implementati 2021-03-31 2021-05-26 2021-11-22 Quotations Envelope for Grievance Redress on Mechanism (GRM) MOGE/G/002/2021 / Supply and Delivery of Fifty Six Pending Request for Single Stage - One Thousand Seven Hundred IDA / 56580 Keeping Girls in School Post Limited 48,600.00 0.00 Implementati 2021-06-09 2021-08-04 2022-01-31 Quotations Envelope Seventy (56770No.) Washable on Face Masks MOGE/G/003/2021 / Supply and Delivery of Three Pending Request for Single Stage - One Thousand Three Hundred IDA / 56580 Keeping Girls in School Post Limited 33,600.00 0.00 Implementati 2021-06-09 2021-08-04 2022-01-31 Quotations Envelope Thirty (3330No.) Hand Wash on Liquid Soap MOGE/G/004/2021 / Supply and Delivery of One Thousand Pending Six Hundred Sixty Five Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 47,500.00 0.00 Implementati 2021-06-09 2021-08-04 2022-01-31 (1665No.) Portable Handwash Quotations Envelope on Buckets & Basins on Portable Y12 Steel Frame MOGE/G/005/2021 / Supply Pending and Delivery of Three Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 26,289.50 0.00 Implementati 2021-06-09 2021-08-04 2022-01-31 Hundred Thirty Three (333No. Quotations Envelope on ) Infrared Thermometers NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOGE/002/2017 / Printing of Secondary School Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 14,250.00 0.00 Canceled 2017-12-06 2018-01-31 2018-01-31 Sensitization/awareness Quotations Envelope materials. MOGE/G/01/2018 / Printing Under of Secondary School Request for Single Stage - One IDA / 56580 Keeping Girls in School Post Limited 24,500.00 0.00 Implementati 2018-05-05 2019-12-23 2018-06-11 2018-06-25 Sensitization/awareness Quotations Envelope on materials CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MGE/C/006 / Information System Module, Developmemnt of the Quality And Cost- Pending IDA / 56580 Keeping Girls in School Post Open - International 500,000.00 0.00 2015-08-03 2015-08-24 2016-11-16 2016-12-14 2017-01-13 2017-02-17 2017-03-24 2018-03-24 software to capture real time Based Selection Implementation information in the field and testing of Realtime Data MOGE/C/08/17 / Consultant Consultancy services of TA for Under IDA / 56580 Keeping Girls in School Post Qualification Open - International 60,000.00 0.00 2017-06-19 2017-06-13 2017-07-10 2017-08-23 2017-09-22 2017-10-27 2018-04-25 M&E framework and data Implementation Selection collection/monitoring tools. MGE/C/005 / Support to Consultant implement the action plan to IDA / 56580 Keeping Girls in School Post Qualification Open - National 51,000.00 0.00 Canceled 2017-04-20 2017-05-11 2017-06-24 2017-07-24 2017-08-28 2018-02-24 harmonize existing secondary Selection school support schemes MGE/C/004 / TA to Consultant harmonize existing bursary IDA / 56580 Keeping Girls in School Post Qualification Open - National 60,000.00 0.00 Canceled 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-01-24 and assessment, strategy Selection MGE/C/003 / Design of complaints & Grievance Quality And Cost- IDA / 56580 Keeping Girls in School Prior Open - International 200,000.00 0.00 Canceled 2017-01-20 2017-02-10 2017-03-26 2017-04-23 2017-05-23 2017-06-27 2017-08-01 2018-08-01 Mechanism for the Keeping Based Selection Girls in School Initiative MOGE/C/002/2018 / Consultancy services for the Consultant Designing of a Case IDA / 56580 Keeping Girls in School Post Qualification Open - National 120,000.00 0.00 Canceled 2018-05-07 2018-06-06 2018-05-14 2018-06-27 2018-07-27 2018-08-31 2019-02-27 Management Framework for Selection Keeping Girls in School MOGE/C/009/18 / Consultancy Services for the Non-Profit Designing of a Case IDA / 56580 Keeping Girls in School Prior Limited 120,000.00 0.00 Canceled 2018-08-07 2018-10-05 2018-08-21 2018-11-01 2018-09-20 2018-10-25 2019-04-23 Organizations Management Framework for Keeping Girls in School. ZM-MOGE-106019-CS-NPO / Consultancy Services to Non-Profit Under Design and Develop a Case IDA / 56580 Keeping Girls in School Post Limited 120,000.00 0.00 2018-10-05 2019-04-04 2018-11-01 2019-06-18 2019-03-26 2019-06-18 2019-04-30 2019-10-27 Organizations Implementation Management Framework for Keeping Girls in School MOGE/C/001/2021 / Provision of Consultancy Services for Empowerment Quality Based IDA / 56580 Keeping Girls in School Prior Open - International 500,000.00 0.00 Canceled 2021-01-21 2021-01-21 2021-02-11 2021-03-27 2021-04-24 2021-05-24 2021-06-23 2021-07-28 2022-07-28 Pilot to Address School- Selection Related Gender Based Violence (SRGBV) Page 2 MOGE/CS/001/2021 / Provision of Consultancy Services for Empowerment Quality And Cost- Under Pilot to Address School- IDA / 56580 Keeping Girls in School Post Open - International 500,000.00 0.00 2021-02-15 2021-02-11 2021-03-08 2021-02-19 2021-04-21 2021-05-19 2021-06-18 2021-07-23 2021-08-27 2022-08-27 Based Selection Implementation Related Gender Based Violence (SRGBV) for the Keeping Girls in School (KGS) Initiative INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOGE/C/07/17 / Individual Under RECRUITMENT OF AN IT IDA / 56580 Keeping Girls in School Post Consultant Open 25,000.00 0.00 2017-06-19 2017-06-09 2017-08-07 2017-08-28 2017-10-02 2018-03-31 Implementation SPECIALIST Selection MGE/C/001 / Assessment for Individual the identification of IDA / 56580 Keeping Girls in School Post Consultant Limited 45,000.00 0.00 Canceled 2017-02-06 2017-02-11 2017-03-04 2017-04-08 2017-10-05 technological innovations Selection MGE/C/002 / Development Individual of a beneficiary awareness IDA / 56580 Keeping Girls in School Post Consultant Limited 50,000.00 0.00 Canceled 2017-02-06 2017-02-11 2017-03-04 2017-04-08 2017-10-05 strategy for Kepping Girls in Selection School MOGE/C/007/18 / Consultancy Services for the enhancement of Keeping Girls IDA / 56580 Keeping Girls in School Prior Direct Selection Direct 192,000.00 0.00 Canceled 2018-08-27 2018-10-16 2018-09-06 2018-11-10 2018-11-10 2019-05-09 in School for the Management Information System. ZM-MOGE-105949-CS-CDS / Consultancy Services for Under Enhancement of Keeping Girls IDA / 56580 Keeping Girls in School Post Direct Selection Direct 192,000.00 0.00 2018-10-16 2019-03-26 2018-11-16 2019-04-15 2019-04-30 2020-01-25 Implementation in School Management Information System Module Individual ZM-MOGE-206017-CS-INDV Under IDA / 56580 Keeping Girls in School Post Consultant Open 45,684.00 0.00 2020-12-18 2020-12-04 2021-02-05 2021-02-26 2021-04-02 2021-09-29 / Project Coordinator Implementation Selection ZM-MOGE-206033-CS-INDV Individual Under / Assistant Project IDA / 56580 Keeping Girls in School Post Consultant Open 42,624.00 0.00 2020-12-18 2020-12-04 2021-02-05 2021-02-26 2021-04-02 2021-09-29 Implementation Coordinator Selection Individual ZM-MOGE-206034-CS-INDV Under IDA / 56580 Keeping Girls in School Post Consultant Open 38,034.00 0.00 2020-12-18 2020-12-04 2021-02-05 2021-02-26 2021-04-02 2021-09-29 / Program Officer Implementation Selection Individual ZM-MOGE-206037-CS-INDV Under IDA / 56580 Keeping Girls in School Post Consultant Open 38,034.00 0.00 2020-12-18 2020-12-04 2021-02-05 2021-02-26 2021-04-02 2021-09-29 / Program Officer Implementation Selection ZM-MOGE-206039-CS-INDV Individual Under / Gender and IDA / 56580 Keeping Girls in School Post Consultant Open 38,034.00 0.00 2020-12-18 2020-12-04 2021-02-05 2021-02-26 2021-04-02 2021-09-29 Implementation Communications Specialist Selection ZM-MOGE-206041-CS-INDV Individual Under / Grievance Redress IDA / 56580 Keeping Girls in School Post Consultant Open 38,034.00 0.00 2020-12-18 2020-12-04 2021-02-05 2021-02-26 2021-04-02 2021-09-29 Implementation Mechanism Officer Selection ZM-MOGE-206042-CS-INDV Individual Under / Monitoring and Evaluation IDA / 56580 Keeping Girls in School Post Consultant Open 38,034.00 0.00 2020-12-18 2020-12-04 2021-02-05 2021-02-26 2021-04-02 2021-09-29 Implementation Officer Selection Individual ZM-MOGE-206043-CS-INDV Under IDA / 56580 Keeping Girls in School Post Consultant Open 36,504.00 0.00 2020-12-18 2020-12-22 2021-02-05 2021-02-26 2021-04-02 2021-09-29 / Procurement Specialist Implementation Selection Individual ZM-MOGE-206044-CS-INDV Under IDA / 56580 Keeping Girls in School Post Consultant Open 34,974.00 0.00 2020-12-18 2020-12-22 2021-02-05 2021-02-26 2021-04-02 2021-09-29 / Project Accountant Implementation Selection MOGE/C/003/2020 / Provision of Consultancy Under Services for Enhancement, IDA / 56580 Keeping Girls in School Post Direct Selection Direct 130,000.00 225,400.00 2020-11-30 2020-12-23 2020-12-10 2020-09-22 2021-02-13 2021-08-12 Implementation Support/Maintenance and Training of KGS-MIS MOGE/C/002/2020 / Provision of Consultancy Under Services for Piloting the IDA / 56580 Keeping Girls in School Post Direct Selection Direct 250,000.00 319,703.92 2020-11-30 2020-12-23 2020-12-10 2020-09-22 2021-02-13 2021-08-12 Implementation Implementation of Case Management Framework Individual ZM-MOGE-206054-CS-INDV Pending IDA / 56580 Keeping Girls in School Post Consultant Open 38,034.00 0.00 2020-12-18 2021-02-05 2021-02-26 2021-04-02 2021-09-29 / Case Managment Specialist Implementation Selection Page 3 PROCUREMENT PLAN (Textual Part) Project information: JM Strategic Public Sector Transformation Project – P146688 Project Implementation agency: Ministry of Finance and the Public Service Date of the Procurement Plan: November 21, 2017 Period covered by this Procurement Plan: November 2017 – March 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the Bank’s procedures shall be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations – Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works) – Not Applicable PROCUREMENT Jamaica : Jamaica Strategic Public Sector Transformation PLAN General Information Country: Jamaica Bank’s Approval Date of the Original Procurement Plan: 2017-11-22 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146688 GPN Date: 2017-11-06 Project Name: Jamaica Strategic Public Sector Transformation Loan / Credit No: IBRD / 84060 Ministry of Finance and the Public Service Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Document Amount Amount Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion Type (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Public JM-MOFPS-35411-GO-RFQ / Request for Single Stage - One 2018-01- 2018-03- 2018-08- IBRD / 84060 Investment Management Post Limited 3,846.00 0.00 Canceled Printing of PIMS Guidelines Quotations Envelope 06 03 30 System (PIMS) JM-MOFPS-35495-GO-RFQ / Strengthening Budget Request for Single Stage - One 2018-01- 2018-03- 2018-04- Publishing of Simplified IBRD / 84060 Preparation Process and Post Limited 3,846.00 0.00 Canceled Quotations Envelope 27 24 11 Citizen Budget Result Based Budgeting JM-MOFPS-35676-GO-RFB / Fostering Industrial Growth Single Stage - One 2017-11- 2016-11- 2017-11- 2017-12- 2016-12- 2018-01- 2017-03- 2018-03- 2017-05- 2018-09- 2017-11- IBRD / 84060 Post Request for Bids Open - National 128,000.00 113,061.28 Completed Stand By Generator and Trade Facilitation Envelope 13 30 18 30 14 29 10 05 18 01 30 JM-MOFPS-36870-GO-RFQ / Fostering Industrial Growth Request for Single Stage - One 2017-12- 2018-01- 2018-07- Equipment for Metrology IBRD / 84060 Post Limited 100,000.00 0.00 Canceled and Trade Facilitation Quotations Envelope 05 30 29 Upgrades JM-MOFPS-36873-GO-RFQ / Fostering Industrial Growth Request for Single Stage - One 2017-12- 2018-01- 2018-07- Civil Engineering Testing IBRD / 84060 Post Limited 100,000.00 0.00 Canceled and Trade Facilitation Quotations Envelope 05 30 29 Equipment JM-MOFPS-36876-GO-RFB / Fostering Industrial Growth Single Stage - One 2017-11- 2016-09- 2017-12- 2018-01- 2016-10- 2018-02- 2017-07- 2018-03- 2018-01- 2018-09- 2018-04- IBRD / 84060 Post Request for Bids Open - National 350,000.00 343,188.70 Completed Tyre Testing Equipment and Trade Facilitation Envelope 30 20 05 16 31 15 11 22 15 18 30 JM-MOFPS-36878-GO-RFB / Purchase and installation of Adaptive Public Sector Single Stage - One 2017-11- 2018-10- 2017-12- 2018-01- 2018-11- 2018-02- 2018-11- 2018-03- 2020-10- 2018-09- 2020-12- VC equipment for MOFP IBRD / 84060 Post Request for Bids Open - National 354,000.00 395,137.86 Completed Approaches Envelope 30 16 05 16 13 15 30 22 14 18 31 hardware items for transformation JM-MOFPS-37179-GO-RFQ / Adaptive Public Sector Request for Single Stage - One 2017-12- 2018-01- 2018-07- Change Management IBRD / 84060 Post Limited 100,000.00 0.00 Canceled Approaches Quotations Envelope 06 31 30 Activities JM-MOFPS-37216-GO-RFQ / Adaptive Public Sector Request for Single Stage - One 2018-02- 2018-04- 2018-10- Purchase of software to IBRD / 84060 Post Limited 46,154.00 0.00 Canceled Approaches Quotations Envelope 10 07 04 support change management JM-MOFPS-37219-GO-RFB / Fostering Industrial Growth Single Stage - One 2018-04- 2018-04- 2018-05- 2018-06- 2018-07- 2019-01- Supply of Equipment and IBRD / 84060 Post Request for Bids Open - National 226,154.00 0.00 Canceled and Trade Facilitation Envelope 02 07 19 18 23 19 Software JM-MOFPS-36869-GO-RFQ / Fostering Industrial Growth Request for Single Stage - One 2018-01- 2018-03- 2018-09- Equipment for Chemistry and IBRD / 84060 Post Limited 53,846.00 0.00 Canceled and Trade Facilitation Quotations Envelope 20 17 13 Biology JM-MOFPS-37227-GO-RFQ / Strengthening Public Request for Single Stage - One 2017-12- 2018-02- 2018-08- Printed products (brochures, IBRD / 84060 Investment Management Post Limited 50,000.00 0.00 Canceled Quotations Envelope 09 03 02 test kits) for PIMS System (PIMS) JM-MOFPS-56682-GO-RFQ / Strengthening Public Communication Plan Request for Single Stage - One 2018-05- 2018-06- 2018-12- IBRD / 84060 Investment Management Post Limited 25,925.94 0.00 Canceled Activities of Change Quotations Envelope 05 30 27 System (PIMS) Management Advisor JM-MOFPS-56486-GO-RFQ / Adaptive Public Sector Request for Single Stage - One 2018-09- 2018-11- 2019-05- Purchase of Software to IBRD / 84060 Post Limited 7,407.41 0.00 Canceled Approaches Quotations Envelope 17 12 11 support change management JM-MOFPS-56680-GO-RFQ / Strengthening Budget Request for Single Stage - One 2018-12- 2019-02- 2019-03- Publish Revised Budget IBRD / 84060 Preparation Process and Post Limited 14,814.81 0.00 Canceled Quotations Envelope 15 09 31 Manuals Result Based Budgeting JM-MOFPS-56517-GO-RFQ / Strengthening Budget Request for Single Stage - One 2018-06- 2017-09- 2018-08- 2021-03- 2018-10- 2021-03- Publishing of Simplified IBRD / 84060 Preparation Process and Post Limited 22,222.22 67,715.72 Completed Quotations Envelope 09 26 04 07 03 31 Citizen's Budget Result Based Budgeting JM-MOFPS-56523-GO-RFQ / Stakeholder Seminars and Fostering Industrial Growth Request for Single Stage - One 2018-04- 2018-06- 2018-12- IBRD / 84060 Post Limited 100,000.00 0.00 Canceled Public Information Campaign and Trade Facilitation Quotations Envelope 14 09 06 on the new BSJ & NQI JM-MOFPS-56529-GO-RFB / Supply Install Equipment for Fostering Industrial Growth Single Stage - One 2019-03- 2019-03- 2019-04- 2019-05- 2019-06- 2019-10- IBRD / 84060 Post Request for Bids Open - National 185,000.00 0.00 Canceled implementation of ICT and Trade Facilitation Envelope 05 10 21 21 25 03 Strategy JM-MOFPS-56642-GO-RFB / Fostering Industrial Growth Single Stage - One 2018-04- 2018-04- 2018-06- 2018-07- 2018-08- 2018-10- National conference on IBRD / 84060 Post Request for Bids Open - National 185,185.00 0.00 Canceled and Trade Facilitation Envelope 16 21 02 02 06 05 standards quality . JM-MOFPS-56497-GO-RFQ / Adaptive Public Sector Single Stage - One 2018-06- 2018-06- 2018-08- 2018-09- 2018-10- 2019-02- HR Shared Services - Assets IBRD / 84060 Post Request for Bids Open - National 385,185.19 0.00 Canceled Approaches Envelope 18 23 04 03 08 05 (Furniture and Equipment) JM-MOFPS-49301-GO-RFB / Fostering Industrial Growth Open - Single Stage - One 2018-05- 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-12- 2018-08- 2020-01- 2019-02- Procurement of Laboratory IBRD / 84060 Post Request for Bids 915,111.00 1,200,210.21 Signed and Trade Facilitation International Envelope 07 13 12 29 23 31 23 17 27 02 23 Equipment JM-MOFPS-56487-GO-RFB / Purchase of ICT Hardware Support items for Adaptive Public Sector Single Stage - Two 2018-05- 2018-09- 2018-05- 2018-07- 2018-11- 2018-09- 2019-11- 2018-10- 2019-04- IBRD / 84060 Post Request for Bids Open - National 296,296.30 0.00 Canceled Transformation - Approaches Envelope 21 03 26 07 13 19 30 24 22 Printers/Multimedia & Video conferencing facilities JM-MOFPS-56515-GO-RFQ / Strengthening Budget Request for Single Stage - One 2018-06- 2018-08- 2018-10- Public Fora on the Citizen's IBRD / 84060 Preparation Process and Post Limited 22,222.22 0.00 Canceled Quotations Envelope 09 04 03 Budget Result Based Budgeting JM-MOFPS-61047-GO-RFB / Fostering Industrial Growth Open - Single Stage - One 2018-05- 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-09- 2018-09- 2018-12- 2019-03- 2019-04- IBRD / 84060 Post Request for Bids 240,000.00 188,200.00 Completed Mobile Calibration Equipment and Trade Facilitation International Envelope 14 28 19 29 30 18 30 19 03 28 02 30 JM-MOFPS-73285-GO-DIR / Modernizing the Accountant 2018-08- 2018-08- 2018-09- 2019-03- Caseware Software IBRD / 84060 Post Direct Selection Direct 42,485.00 0.00 Canceled General's Department (AGD) 08 13 17 16 (AugdDepartment) JM-MOFPS-73686-GO-DIR / Adaptive Public Sector 2018-08- 2019-08- 2018-08- 2019-09- 2018-09- 2019-09- 2019-03- 2019-10- Online Legal Research IBRD / 84060 Post Direct Selection Direct 65,000.00 10,774.40 Completed Approaches 17 27 22 04 26 30 25 31 Software/Database Page 1 JM-MOFPS-80032-GO-RFB / Procurement of Petroleum Fostering Industrial Growth Open - Single Stage - One 2018-11- 2018-12- 2018-11- 2019-01- 2018-12- 2019-02- 2019-01- 2019-03- 2019-02- 2019-09- 2019-08- Fuel Analytical Equipment for IBRD / 84060 Post Request for Bids 155,000.00 173,796.23 Signed and Trade Facilitation International Envelope 05 28 10 25 22 22 21 15 25 06 24 the Bureau of Standards Jamaica (BSJ). JM-MOFPS-87360-GO-RFQ / Adaptive Public Sector Request for Single Stage - One 2018-12- 2019-02- 2019-08- IBRD / 84060 Post Limited 67,000.00 0.00 Canceled Digital Signage Equipment Approaches Quotations Envelope 08 02 01 JM-MOFPS-100113-GO-RFB / Delivery and Installation of Laboratory Environmental Fostering Industrial Growth Open - Single Stage - One 2019-02- 2019-02- 2019-03- 2019-04- 2019-06- 2019-11- Control System for Pressure IBRD / 84060 Post Request for Bids 323,076.92 0.00 Canceled and Trade Facilitation International Envelope 11 16 30 29 03 30 and Force Metrology Laboratory and Training of BSJ Staff JM-MOFPS-100122-GO-RFB / Supply and Installation of Fostering Industrial Growth Open - Single Stage - One 2019-02- 2019-07- 2019-02- 2019-07- 2019-03- 2019-09- 2019-04- 2019-10- 2019-06- 2019-11- IBRD / 84060 Post Request for Bids 210,692.31 0.00 Canceled Mass Comparator and Volume and Trade Facilitation International Envelope 11 24 16 24 30 05 29 29 03 30 Metrology Equipment JM-MOFPS-113383-GO-RFB / Design, Supply and Installation Laboratory Environment Control Systems & Training for the BSJ: Fostering Industrial Growth Open - Single Stage - One 2019-05- 2019-07- 2019-05- 2019-07- 2019-06- 2019-09- 2019-07- 2020-05- 2019-08- 2020-09- 2020-02- a. Pressure and Force IBRD / 84060 Post Request for Bids 946,153.85 986,494.00 Signed and Trade Facilitation International Envelope 03 24 08 24 19 26 19 04 23 04 19 Laboratory b. Liquid Volume and Flow Laboratory c. Time and Frequency Laboratory JM-MOFPS-113387-GO-RFB / Equipment for the Bureau of Fostering Industrial Growth Open - Single Stage - One 2019-05- 2019-05- 2019-06- 2019-07- 2019-08- 2020-02- IBRD / 84060 Post Request for Bids 130,769.00 0.00 Canceled Standards Thermometry and Trade Facilitation International Envelope 03 08 19 19 23 19 Laboratory JM-MOFPS-113413-GO-RFB Adaptive Public Sector Open - Single Stage - One 2019-05- 2019-09- 2019-05- 2019-09- 2019-06- 2019-10- 2019-07- 2019-12- 2019-08- 2020-03- 2020-02- 2020-09- IBRD / 84060 Post Request for Bids 607,691.00 755,872.98 Completed / Office Furniture PSTIU Approaches International Envelope 03 22 08 23 19 24 19 31 23 20 19 30 JM-MOFPS-113535-GO-RFQ Adaptive Public Sector Request for Single Stage - One 2019-05- 2019-03- 2019-07- 2019-12- IBRD / 84060 Post Limited 24,924.81 0.00 Canceled / Tablets (CLS Project) Approaches Quotations Envelope 09 03 04 31 JM-MOFPS-113536-GO-RFQ Adaptive Public Sector Request for Single Stage - One 2019-05- 2019-07- 2019-12- / Records and Management IBRD / 84060 Post Limited 40,000.00 0.00 Canceled Approaches Quotations Envelope 09 04 31 Records System JM-MOFPS-113769-GO-RFQ Adaptive Public Sector Request for Single Stage - One 2019-05- 2019-07- 2019-06- 2020-01- 2020-01- IBRD / 84060 Post Open - National 1,434.01 60,815.35 Completed / 2-in-1 Laptops for AGC Approaches Quotations Envelope 11 06 25 02 31 JM-MOFPS-113415-GO-RFQ / Procurement of Microsoft Adaptive Public Sector Request for Open - Single Stage - One 2019-05- 2019-07- 2019-03- 2019-12- 2019-07- IBRD / 84060 Post 65,690.00 57,629.03 Completed Software - for Centralization Approaches Quotations International Envelope 08 03 07 30 16 of Legal Services JM-MOFPS-113527-GO-RFB / Hyper- Converged Infrastructure Solution for the Adaptive Public Sector Open - Single Stage - One 2019-06- 2019-09- 2019-06- 2019-09- 2019-07- 2019-09- 2019-08- 2020-01- 2019-09- 2021-04- 2020-03- IBRD / 84060 Post Request for Bids 1,264,615.00 1,035,347.64 Signed Primary and Secondary site Approaches International Envelope 07 29 12 29 24 28 23 28 27 26 25 for eGov Jamaica Limited Data Centre JM-MOFPS-125797-GO-RFQ / Office Furniture for Adaptive Public Sector Request for Single Stage - One 2019-08- 2019-08- 2019-10- 2019-11- 2020-04- 2020-01- IBRD / 84060 Post Limited 17,851.50 19,632.88 Completed Transformation Approaches Quotations Envelope 16 12 11 21 08 16 Implementation Unit JM-MOFPS-35494-GO-RFP / Strengthening Public Public Investment Request for Open - Single Stage - Two 2018-01- 2018-01- 2018-05- 2018-03- 2018-05- 2018-08- 2019-08- IBRD / 84060 Investment Management Post 4,500,000.00 0.00 Canceled Management Information Proposals International Envelope 22 27 29 10 23 20 20 System (PIMS) System JM-MOFPS-143163-GO-RFB / Supply, Installation and Commissioning of Synergy Enclosure with all compute Adaptive Public Sector Open - Single Stage - One 2019-11- 2020-02- 2019-11- 2020-02- 2019-12- 2020-03- 2020-01- 2020-06- 2020-02- 2020-12- 2020-08- IBRD / 84060 Post Request for Bids 420,373.59 369,254.69 Signed nodes, synergy driven Approaches International Envelope 05 11 10 11 22 12 21 03 25 22 23 enclosure, storage array and connect Synergy enclosure to the existing network. JM-MOFPS-113385-GO-RFB Fostering Industrial Growth Open - Single Stage - One 2019-05- 2019-05- 2019-06- 2019-07- 2019-08- 2020-02- / ICT Upgrade solution for the IBRD / 84060 Post Request for Bids 960,000.00 0.00 Canceled and Trade Facilitation International Envelope 03 08 19 19 23 19 Bureau of Standards Jamaica JM-MOFPS-125434-GO-RFB / Case Management System Adaptive Public Sector Open - Single Stage - One 2020-01- 2020-01- 2020-03- 2020-03- 2020-05- 2021-05- IBRD / 84060 Post Request for Bids 358,200.00 0.00 Canceled for the Attorney General Approaches International Envelope 14 19 01 31 05 05 Chamber (AGC) JM-MOFPS-143161-GO-RFB Strengthening Public / Public Investment Open - Single Stage - One 2020-01- 2020-03- 2020-01- 2020-02- 2020-03- 2020-05- 2021-05- IBRD / 84060 Investment Management Prior Request for Bids 4,000,000.00 0.00 Canceled Management Information International Envelope 13 16 18 29 30 04 04 System (PIMS) System JM-MOFPS-125431-GO-RFB / Laptops and Desktop Adaptive Public Sector Open - Single Stage - One 2019-10- 2019-08- 2019-10- 2019-12- 2019-10- 2020-01- 2020-02- 2020-02- 2020-02- 2020-08- 2020-07- IBRD / 84060 Post Request for Bids 168,655.00 164,614.57 Completed Computer for the Attorney Approaches International Envelope 18 01 23 04 25 03 04 07 18 05 13 General's Chambers (AGC) JM-MOFPS-135583-GO-RFB Adaptive Public Sector Single Stage - One 2019-09- 2019-08- 2019-09- 2019-11- 2019-09- 2019-12- 2019-07- 2020-01- 2020-02- 2020-07- 2020-05- / Laptops and Accessories for IBRD / 84060 Post Request for Bids Open - National 108,000.00 72,694.85 Completed Approaches Envelope 25 31 30 11 23 11 11 15 18 13 31 Auditor General`s Department JM-MOFPS-148632-GO-RFB / Supply, Installation and Fostering Industrial Growth Open - Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-05- 2021-10- Commissioning of ICT IBRD / 84060 Post Request for Bids 924,444.44 0.00 Canceled and Trade Facilitation International Envelope 13 18 29 30 04 31 Upgrade Solution for the Bureau of Standards Jamaica JM-MOFPS-151088-GO-RFQ / Procurement of Heavy Duty Adaptive Public Sector Request for Single Stage - One 2020-01- 2020-02- 2020-03- 2020-05- 2020-06- IBRD / 84060 Post Open - National 17,740.74 10,317.88 Completed Multi-Function Copier Approaches Quotations Envelope 03 28 26 28 23 /Scanner/Printer for the AGC JM-MOFPS-151693-GO-RFB / Supply and Installation of Fostering Industrial Growth Open - Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-05- 2020-10- Laboratory Analytical IBRD / 84060 Post Request for Bids 90,000.00 0.00 Canceled and Trade Facilitation International Envelope 12 17 28 29 03 30 Equipment for the BSJ Micro Biology Laboratory JM-MOFPS-151775-GO-RFB / Supply and Installation of Measurement Equipment and Fostering Industrial Growth Open - Single Stage - One 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-05- 2020-10- IBRD / 84060 Post Request for Bids 130,000.00 0.00 Canceled Standards for the BSJ and Trade Facilitation International Envelope 12 09 17 09 28 29 03 30 Temperature Metrology laboratory JM-MOFPS-151069-GO-DIR Adaptive Public Sector 2019-12- 2019-08- 2019-12- 2019-08- 2020-01- 2019-12- 2021-01- 2020-01- / Articulate 360 Software for IBRD / 84060 Post Direct Selection Direct 6,170.25 6,170.25 Completed Approaches 18 01 23 19 27 10 26 16 HR Shared Services JM-MOFPS-163392-GO-RFB Strengthening Public / Public Investment Open - Single Stage - One 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-06- 2020-05- 2020-11- 2020-07- 2021-01- 2021-07- IBRD / 84060 Investment Management Post Request for Bids 1,800,000.00 997,608.69 Signed Management Information International Envelope 13 20 18 20 29 16 29 16 03 21 03 System (PIMS) System Page 2 JM-MOFPS-167825-GO-RFB / Supply and Installation of Standard Measurement Equipment & Training for Bureau of Standards of Fostering Industrial Growth Open - Single Stage - One 2020-04- 2019-07- 2020-04- 2020-05- 2019-09- 2020-06- 2020-07- 2021-01- IBRD / 84060 Post Request for Bids 588,185.19 0.00 Canceled Jamaica and Trade Facilitation International Envelope 06 12 11 23 05 22 27 23 Lot 1 - Volume Metrology Equipment & Training Lot 2 - Mass Comparator Equipment & Training JM-MOFPS-191286-GO-RFB Strengthening Budget Single Stage - One 2020-09- 2020-09- 2020-09- 2020-10- 2020-11- 2020-12- 2021-06- / Desktops and Laptops for IBRD / 84060 Preparation Process and Post Request for Bids Open - National 60,000.00 0.00 Canceled Envelope 07 08 12 24 23 28 26 Public Expenditure Div, MOF Result Based Budgeting NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JM-MOFPS-56641-NC-RFB / Comptence Buidling for NCRA Fostering Industrial Growth Open - Single Stage - One 2018-04- 2018-04- 2018-06- 2018-07- 2018-08- 2018-11- IBRD / 84060 Post Request for Bids 106,667.00 0.00 Canceled (business process, process and Trade Facilitation International Envelope 23 28 09 09 13 11 and systems upgrade ) JM-MOFPS-61045-NC-RFQ / Adaptive Public Sector Request for Single Stage - One 2018-05- 2018-07- 2019-01- IBRD / 84060 Post Limited 18,518.52 0.00 Canceled Strategic Planning Retreat Approaches Quotations Envelope 26 21 17 JM-MOFPS-61046-NC-RFQ / Adaptive Public Sector Request for Single Stage - One 2018-06- 2018-07- 2019-01- IBRD / 84060 Post Limited 22,222.22 0.00 Canceled Transformation Unit Retreat Approaches Quotations Envelope 02 28 24 JM-MOFPS-62068-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ - IBRD / 84060 Prior Direct Selection Direct 5,588.00 0.00 Canceled and Trade Facilitation 14 19 23 20 Jamaica Observer JM-MOFPS-62078-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 4,648.00 0.00 Canceled and Trade Facilitation 14 19 23 20 The Star JM-MOFPS-62082-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign , BSJ- IBRD / 84060 Prior Direct Selection Direct 3,626.00 0.00 Canceled and Trade Facilitation 14 19 23 20 Western Mirror JM-MOFPS-62084-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 6,058.00 0.00 Canceled and Trade Facilitation 21 26 30 27 Irie FM JM-MOFPS-62087-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ, IBRD / 84060 Prior Direct Selection Direct 4,725.00 0.00 Canceled and Trade Facilitation 21 25 26 30 27 ZIP JM-MOFPS-62088-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ , IBRD / 84060 Prior Direct Selection Direct 4,520.00 0.00 Canceled and Trade Facilitation 21 26 30 27 LOVE FM JM-MOFPS-62093-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 3,207.00 0.00 Canceled and Trade Facilitation 21 26 30 27 MELLO JM-MOFPS-62099-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 1,943.00 0.00 Canceled and Trade Facilitation 21 26 30 27 Nationwide JM-MOFPS-62101-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ - IBRD / 84060 Prior Direct Selection Direct 49,396.00 0.00 Canceled and Trade Facilitation 21 26 30 27 TVJ JM-MOFPS-62105-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 20,038.00 0.00 Canceled and Trade Facilitation 21 26 30 27 CVM JM-MOFPS-62109-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 21 26 30 27 Flow HGTV JM-MOFPS-62115-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 21 26 30 27 LMN JM-MOFPS-62117-NC-DIR / Fostering Industrial Growth 2018-05- 2018-06- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 21 01 26 30 27 ESPN JM-MOFPS-62118-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ - IBRD / 84060 Prior Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 21 26 30 27 BET JM-MOFPS-62119-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 21 26 30 27 CNN JM-MOFPS-62120-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign-, BSJ- IBRD / 84060 Prior Direct Selection Direct 8,345.00 0.00 Canceled and Trade Facilitation 21 26 30 27 Cinema JM-MOFPS-62121-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 19,547.00 0.00 Canceled and Trade Facilitation 21 26 30 27 Superboard & Tri Media JM-MOFPS-62123-NC-DIR / Fostering Industrial Growth 2018-05- 2018-06- 2018-05- 2018-06- 2018-12- Public Media Campaign- IBRD / 84060 Prior Direct Selection Direct 2,237.00 0.00 Canceled and Trade Facilitation 21 08 26 30 27 Gleaner Online JM-MOFPS-62124-NC-DIR / Fostering Industrial Growth 2018-05- 2018-06- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 1,780.00 0.00 Canceled and Trade Facilitation 21 08 26 30 27 Observer Online JM-MOFPS-62126-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 5,592.00 0.00 Canceled and Trade Facilitation 21 26 30 27 Programmatic JM-MOFPS-62128-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 6,710.00 0.00 Canceled and Trade Facilitation 21 26 30 27 Google Ads JM-MOFPS-62130-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign, BSJ- IBRD / 84060 Prior Direct Selection Direct 3,691.00 0.00 Canceled and Trade Facilitation 21 26 30 27 Facebook Ads JM-MOFPS-62183-NC-RFB / Competence Buidling for Fostering Industrial Growth Open - Single Stage - One 2018-06- 2018-06- 2018-07- 2018-08- 2018-09- 2019-03- IBRD / 84060 Prior Request for Bids 106,667.00 0.00 Canceled NCRA/International and Trade Facilitation International Envelope 01 06 18 17 21 20 Facilitating Partner JM-MOFPS-62065-NC-DIR / Fostering Industrial Growth Single Stage - One 2019-01- 2018-07- 2019-01- 2018-03- 2019-01- 2019-01- 2019-01- 2020-12- Public Media Campaign BSJ IBRD / 84060 Post Direct Selection Direct - National 13,326.00 52,416.79 Completed and Trade Facilitation Envelope 28 01 28 26 28 21 28 31 NCRA Gleaner JM-MOFPS-62086-NC-DIR / Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-12- Public Media Campaign , BSJ - IBRD / 84060 Post Direct Selection Direct 5,126.00 0.00 Canceled and Trade Facilitation 21 26 30 27 RJR Page 3 JM-MOFPS-97665-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign - IBRD / 84060 Post Direct Selection Direct 2,237.00 0.00 Canceled and Trade Facilitation 30 04 11 07 Gleaner Online JM-MOFPS-97667-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- IBRD / 84060 Post Direct Selection Direct 19,547.00 0.00 Canceled Superboard & Tri Media and Trade Facilitation 30 04 11 07 JM-MOFPS-97672-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 1,780.00 0.00 Canceled and Trade Facilitation 30 04 11 07 Observer Online JM-MOFPS-97675-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 5,592.00 0.00 Canceled and Trade Facilitation 30 04 11 07 Programmatic JM-MOFPS-97678-NC-DIR / Fostering Industrial Growth 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2020-02- 2019-09- 2020-06- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 6,710.00 22,000.33 Completed and Trade Facilitation 30 01 04 26 11 10 07 30 Google Ads JM-MOFPS-97679-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 3,691.00 0.00 Canceled and Trade Facilitation 30 04 11 07 Facebook Ads JM-MOFPS-97682-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign-, BSJ- IBRD / 84060 Post Direct Selection Direct 8,345.00 0.00 Canceled and Trade Facilitation 30 04 11 07 Cinema JM-MOFPS-97683-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign, BSJ - IBRD / 84060 Post Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 30 04 11 07 BET JM-MOFPS-97684-NC-DIR / Fostering Industrial Growth 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2019-05- 2019-09- 2019-05- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 1,943.00 7,560.00 Completed and Trade Facilitation 30 01 04 26 11 07 07 31 Nationwide JM-MOFPS-97686-NC-DIR / Fostering Industrial Growth 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2019-03- 2019-09- 2020-07- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 3,207.00 9,351.41 Completed and Trade Facilitation 30 01 04 26 11 27 07 31 MELLO JM-MOFPS-97687-NC-DIR / Fostering Industrial Growth 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2020-03- 2019-09- 2020-12- Public Media Campaign, BSJ - IBRD / 84060 Post Direct Selection Direct 5,588.00 10,394.05 Completed and Trade Facilitation 30 01 04 26 11 25 07 31 Jamaica Observer JM-MOFPS-97689-NC-DIR / Fostering Industrial Growth 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2019-09- 2019-09- 2020-04- Public Media Campaign, BSJ - IBRD / 84060 Post Direct Selection Direct 49,396.00 55,451.25 Completed and Trade Facilitation 30 01 04 26 11 12 07 30 TVJ JM-MOFPS-97691-NC-DIR / Fostering Industrial Growth 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2019-04- 2019-09- 2019-08- Public Media Campaign, BSJ, IBRD / 84060 Post Direct Selection Direct 4,725.00 20,035.68 Completed and Trade Facilitation 30 01 04 26 11 30 07 30 ZIP JM-MOFPS-97693-NC-DIR / Fostering Industrial Growth 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2019-12- 2019-09- 2019-12- Public Media Campaign, BSJ , IBRD / 84060 Post Direct Selection Direct 4,520.00 12,066.67 Completed and Trade Facilitation 30 01 04 26 11 10 07 31 LOVE FM JM-MOFPS-97696-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 4,648.00 0.00 Canceled and Trade Facilitation 30 04 11 07 The Star JM-MOFPS-97697-NC-DIR / Fostering Industrial Growth 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2020-03- 2019-09- 2020-12- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 20,038.00 15,062.05 Completed and Trade Facilitation 30 01 04 26 11 25 07 31 CVM JM-MOFPS-97699-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 6,058.00 0.00 Canceled and Trade Facilitation 30 04 11 07 Irie FM JM-MOFPS-97701-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 30 04 11 07 Flow HGTV JM-MOFPS-97704-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 30 04 11 07 LMN JM-MOFPS-97707-NC-DIR / Adaptive Public Sector 2019-01- 2018-07- 2019-02- 2018-03- 2019-03- 2019-07- 2019-09- 2020-07- Public Media Campaign , BSJ- IBRD / 84060 Post Direct Selection Direct 3,626.00 2,302.18 Completed Approaches 30 01 04 26 11 17 07 31 Western Mirror JM-MOFPS-97708-NC-DIR / Fostering Industrial Growth 2019-02- 2019-03- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 20 22 CNN JM-MOFPS-97710-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 30 04 11 07 CNN JM-MOFPS-97712-NC-DIR / Fostering Industrial Growth 2019-01- 2019-02- 2019-03- 2019-09- Public Media Campaign, BSJ- IBRD / 84060 Post Direct Selection Direct 4,660.00 0.00 Canceled and Trade Facilitation 30 04 11 07 ESPN JM-MOFPS-113546-NC-RFQ Adaptive Public Sector Request for Single Stage - One 2019-05- 2019-07- 2019-06- 2019-12- 2019-11- IBRD / 84060 Post Open - National 52,000.00 30,949.25 Completed / Wireless Upgrade AGC Approaches Quotations Envelope 09 04 25 31 29 JM-MOFPS-151090-NC-DIR / Procurement of 72 Enterprise License and 18 Adaptive Public Sector 2019-12- 2019-11- 2019-12- 2019-12- 2020-01- 2020-01- 2020-07- 2020-02- IBRD / 84060 Post Direct Selection Direct 3,690.00 46,238.45 Completed Developer License for the Approaches 18 18 23 16 27 29 25 12 HRSS Test Management and Issue Tracking Solution JM-MOFPS-151774-NC-DIR / Provision of ISO 9001 Fostering Industrial Growth 2019-12- 2019-11- 2020-01- 2020-01- 2020-02- 2020-03- 2020-08- Certification Services by the IBRD / 84060 Post Direct Selection Direct 167,736.86 167,641.30 Signed and Trade Facilitation 29 11 03 03 07 05 05 National Certification Body of Jamaica (NCBJ) JM-MOFPS-151767-NC-DIR / License for Microsoft Office Adaptive Public Sector 2019-12- 2018-11- 2020-01- 2019-12- 2020-02- 2020-02- 2020-03- 2021-03- IBRD / 84060 Post Direct Selection Direct 41,481.48 46,238.85 Completed 365 for Centralization of Approaches 29 14 03 24 07 25 14 31 Legal Service (175 users) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JM-MOFPS-34653-CS-QCBS / Consultant to Develop Integrated Results Based Management Policy for the Strengthening Budget Government of Jamaica Quality And Cost- Open - 2018-02- 2017-11- 2018-02- 2018-01- 2018-04- 2018-01- 2018-05- 2018-03- 2018-06- 2018-04- 2018-07- 2018-05- 2018-09- 2019-05- 2020-03- IBRD / 84060 Preparation Process and Post 125,000.00 94,651.00 Completed 2017-10-30 The main objective of the Based Selection International 05 20 22 03 13 31 16 02 08 06 03 11 03 11 31 Result Based Budgeting consultancy is to design the government's framework for an Integrated Results Based Management (IRBM) Policy. JM-MOFPS-35475-CS-CQS / Consulant to implement a Strengthening Public Consultant Public Investment 2018-05- 2017-12- 2018-01- 2018-03- 2018-04- 2018-10- IBRD / 84060 Investment Management Post Qualification Open - National 76,923.00 0.00 Canceled 2017-11-27 Management Training 23 18 31 02 06 03 System (PIMS) Selection Programme for the Public Sector Page 4 JM-MOFPS-37191-CS-QCBS Adaptive Public Sector Quality And Cost- Open - 2017-12- 2018-02- 2018-03- 2018-04- 2018-05- 2018-06- 2019-06- / Establish Capabilities in IBRD / 84060 Post 200,000.00 0.00 Canceled 2017-12-01 Approaches Based Selection International 22 04 04 03 08 12 12 Enterprise Architecture JM-MOFPS-37194-CS-CQS / Consultant Adaptive Public Sector Open - 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-03- 2018-07- 2018-04- 2018-09- 2018-10- 2019-12- Consultant to assess IBRD / 84060 Post Qualification 200,000.00 390,050.00 Completed 2018-01-05 Approaches International 21 19 01 03 29 05 24 09 24 06 15 competition in Banking Selection JM-MOFPS-37186-CS-QCBS / Organisational Assessment, Business Process Re- Adaptive Public Sector Quality And Cost- Open - 2021-01- 2018-01- 2018-03- 2016-09- 2018-04- 2016-11- 2018-05- 2016-12- 2018-06- 2017-02- 2018-07- 2017-10- 2019-07- IBRD / 84060 Post 550,000.00 1,164,993.00 Signed 2018-01-08 engineering , Job Analysis Approaches Based Selection International 28 29 14 09 11 14 11 19 15 28 20 31 20 and Change Management of the eGov Ja. Ltd. JM-MOFPS-37188-CS-CQS / Consultant Adaptive Public Sector 2018-01- 2018-02- 2018-03- 2019-02- 2018-04- 2018-05- 2018-11- Agile Monitoring Training and IBRD / 84060 Post Qualification Open - National 80,270.00 0.00 Canceled 2018-01-15 Approaches 14 05 21 26 20 25 21 Coaching Selection JM-MOFPS-35485-CS-QCBS Strengthening Public Quality And Cost- 2017-11- 2018-01- 2018-02- 2018-03- 2018-04- 2018-05- 2018-11- / Consultant ACL Audit IBRD / 84060 Investment Management Post Open - National 30,000.00 0.00 Canceled 2017-11-06 Based Selection 27 10 07 09 13 18 14 /Internal Audit Capacity System (PIMS) JM-MOFPS-35461-CS-INDV Strengthening Public Consultant / Consultant to prepare for 2018-01- 2018-03- 2018-04- 2018-05- 2018-11- IBRD / 84060 Investment Management Post Qualification Open - National 153,246.00 0.00 Canceled 2018-01-05 amalgamation into the public 26 11 10 15 11 System (PIMS) Selection sectior JM-MOFPS-37192-CS-LCS / Adaptive Public Sector Quality And Cost- Open - 2018-02- 2018-03- 2018-04- 2018-05- 2018-06- 2018-08- 2019-08- IBRD / 84060 Post 200,000.00 0.00 Canceled 2018-01-22 Tax Credit Consultant Approaches Based Selection International 12 28 25 25 29 03 03 JM-MOFPS-37189-CS-CQS / Consultant Adaptive Public Sector 2016-12- 2018-02- 2018-03- 2017-04- 2018-04- 2017-10- 2018-05- 2017-10- 2018-11- 2018-01- Programme and Portfolio IBRD / 84060 Post Qualification Open - National 57,325.00 57,325.00 Completed 2018-01-15 Approaches 22 05 21 20 20 04 25 04 21 31 Management and Training Selection JM-MOFPS-37184-CS-QCBS Adaptive Public Sector Quality And Cost- Open - 2016-06- 2017-12- 2018-02- 2017-01- 2018-03- 2017-03- 2018-04- 2017-05- 2018-05- 2017-06- 2018-06- 2017-08- 2019-06- 2018-07- / Strategic Review of the IBRD / 84060 Post 153,846.00 210,664.64 Completed 2017-12-01 Approaches Based Selection International 01 22 04 09 04 17 03 08 08 05 12 01 12 02 Ministry of National Security JM-MOFPS-56935-CS-CQS / Consultant for the development of proposals for Strengthening Public Consultant 2018-04- 2018-05- 2018-07- 2019-01- 2018-08- 2019-03- 2018-09- 2019-03- 2019-03- the redevelopment, IBRD / 84060 Investment Management Post Qualification Open - National 50,000.00 203,089.07 Signed 2018-05-07 19 28 11 18 10 04 14 04 13 expansion and upgrading of System (PIMS) Selection the National Stadium and Trelawny Sports Facility JM-MOFPS-56937-CS-CQS / Consultnat for development Strengthening Public Consultant Open - 2018-05- 2018-05- 2018-06- 2018-07- 2019-04- 2018-08- 2019-07- 2018-09- 2019-07- 2019-03- of proposal -Passport , IBRD / 84060 Investment Management Post Qualification 50,000.00 105,254.70 Signed 2018-05-07 International 15 28 28 11 09 10 26 14 26 13 Citizenship and Immigration System (PIMS) Selection Agency (PICA) JM-MOFPS-73270-CS-QBS / Consultant to develop Curriculum for the Public Strengthening Public Quality Based Open - 2018-07- 2018-08- 2018-09- 2018-10- 2019-01- 2018-11- 2019-02- 2018-12- 2019-03- 2019-01- 2019-06- 2019-02- 2019-10- 2020-02- 2020-07- Investment Management IBRD / 84060 Investment Management Post 115,385.00 103,805.41 Completed 2018-08-08 Selection International 29 29 24 12 23 09 26 09 14 08 26 12 01 12 31 System and to design the System (PIMS) Training Strategy for the Training Programme JM-MOFPS-73275-CS-QBS / Firm to Develop and Implement a Change Strengthening Public Quality Based Open - Under 2018-08- 2018-08- 2018-10- 2019-03- 2018-11- 2019-02- 2018-12- 2019-03- 2019-01- 2019-07- 2019-02- 2019-09- 2020-02- 2021-02- Management Plan for IBRD / 84060 Investment Management Post 72,000.00 102,824.40 2018-08-08 Selection International Implementation 13 29 12 12 09 25 09 03 08 03 12 02 12 28 Component 1 - Strengthening System (PIMS) the Public Investment Management System (PIMS) JM-MOFPS-73281-CS-CQS / Consultant Adaptive Public Sector Open - 2018-09- 2018-08- 2019-03- 2018-10- 2019-01- 2018-11- 2020-01- 2018-12- 2020-01- 2019-06- 2020-02- Consultant to Develop Fraud IBRD / 84060 Post Qualification 70,000.00 45,760.00 Completed 2018-08-08 Approaches International 07 29 12 12 21 11 03 16 06 14 14 Training and Trainers Manual Selection JM-MOFPS-73283-CS-CQS / Consultant Consultant for Quality Adaptive Public Sector Open - 2018-09- 2018-08- 2019-03- 2018-10- 2019-06- 2018-11- 2020-02- 2018-12- 2020-03- 2019-06- 2020-07- IBRD / 84060 Post Qualification 70,000.00 60,770.00 Completed 2018-08-08 Assurance Improvement Approaches International 07 29 12 12 05 11 17 16 23 14 15 Selection Program JM-MOFPS-73284-CS-QBS / Adaptive Public Sector Quality Based Open - 2018-09- 2018-08- 2019-05- 2018-10- 2018-11- 2018-12- 2019-01- 2019-02- 2020-02- IBRD / 84060 Post 250,000.00 0.00 Canceled 2018-08-08 Agile Coach Approaches Selection International 13 29 17 12 09 09 08 12 12 JM-MOFPS-73690-CS-CQS / The development of Change Consultant Management and Associated Adaptive Public Sector 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- 2019-06- IBRD / 84060 Post Qualification Open - National 250,000.00 0.00 Canceled 2018-08-17 Communication Strategies Approaches 05 07 25 21 20 25 23 Selection particularly for the ENICTA Project JM-MOFPS-73692-CS-CQS / Consultancy services to guide Strengthening Public Consultant the design of the GoJ Open - 2018-09- 2018-10- 2018-11- 2018-12- 2019-06- IBRD / 84060 Investment Management Post Qualification 280,000.00 0.00 Canceled 2018-08-17 Integrated Financial International 07 21 20 25 23 System (PIMS) Selection Management Information System (IFMIS) JM-MOFPS-79809-CS-QCBS / IFMIS Consultant to Adaptive Public Sector Quality And Cost- Open - 2018-11- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2020-05- IBRD / 84060 Post 280,000.00 0.00 Canceled 2018-11-05 integrate government Approaches Based Selection International 26 09 06 08 12 17 16 financial management system JM-MOFPS-83485-CS-QCBS / Consultancy for the development of a full project Strengthening Public Quality And Cost- 2018-11- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2020-05- proposal document for an IBRD / 84060 Investment Management Post Open - National 83,500.00 0.00 Canceled 2018-11-09 Based Selection 30 13 10 12 16 21 20 alternative fumigation facility System (PIMS) at the export complex in Kingston (PIEF Project) JM-MOFPS-83486-CS-QCBS / Consultant to conduct Cost Strengthening Public Benefit Analysis of the Trade Quality And Cost- 2019-08- 2018-11- 2019-02- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-09- IBRD / 84060 Investment Management Post Open - National 92,000.00 0.00 Canceled 2018-11-09 Facilitation Programme- Based Selection 14 30 11 13 10 12 16 21 18 System (PIMS) Implementation of National Trade Facilitation (PIEF) JM-MOFPS-87363-CS-LCS / Least Cost 2018-12- 2018-12- 2019-02- 2019-06- 2019-03- 2019-09- 2019-04- 2019-07- 2019-05- 2019-09- 2019-06- 2019-09- 2019-12- IBRD / 84060 Project Management Post Open - National 24,000.00 24,232.12 Signed 2018-11-30 Project Auditor Selection 04 21 03 11 03 19 02 19 07 28 11 16 08 JM-MOFPS-113395-CS-QCBS / Consultancy to Implement Adaptive Public Sector Quality And Cost- Open - 2019-07- 2019-05- 2019-07- 2019-07- 2020-01- 2019-08- 2020-03- 2019-09- 2019-12- 2019-10- 2020-09- 2019-11- 2021-01- 2020-11- the Recommendations for IBRD / 84060 Post 957,540.00 979,240.28 Signed 2019-05-03 Approaches Based Selection International 25 24 26 07 06 04 03 03 03 08 02 12 18 11 Rationalisation of Public Bodies JM-MOFPS-113515-CS-QCBS / Architectural Consultancy Adaptive Public Sector Quality And Cost- Open - 2019-05- 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-11- IBRD / 84060 Post 270,000.00 0.00 Canceled 2019-05-04 services for the Fumigation Approaches Based Selection International 25 08 05 04 09 13 12 project JM-MOFPS-113540-CS-QCBS Adaptive Public Sector Quality And Cost- Open - Under 2019-06- 2019-05- 2019-06- 2019-07- 2020-02- 2019-08- 2020-03- 2019-09- 2020-05- 2019-10- 2020-07- 2019-11- 2020-11- / Prior Options Review IBRD / 84060 Post 177,455.92 0.00 2019-05-04 Approaches Based Selection International Implementation 13 25 25 08 11 05 26 04 22 09 24 13 12 Correctional Services, MNS JM-MOFPS-113513-CS-CQS / JM-MoFPS-113513-CS-QBS Strengthening Public Consultant Consultant for the 2019-08- 2019-10- 2019-11- 2019-12- 2020-06- IBRD / 84060 Investment Management Post Qualification Open - National 168,000.00 0.00 Canceled 2019-08-02 Preparation of Project 23 06 05 10 07 System (PIMS) Selection proposal for the National Sports Museum (PIEF) Firm Page 5 JM-MOFPS-114179-CS-CQS / Consultancy for the Strengthening Public Consultant preparation of exhibit Open - 2019-05- 2019-08- 2019-10- 2019-11- 2019-12- 2020-06- IBRD / 84060 Investment Management Post Qualification 85,000.00 0.00 Canceled 2019-08-02 designs, estimates of cost International 06 23 06 05 10 07 System (PIMS) Selection fitting, equiping and operating the national Sport JM-MOFPS-35484-CS-QCBS Consultant Adaptive Public Sector Open - 2016-10- 2019-11- 2020-01- 2017-04- 2020-01- 2017-08- 2020-03- 2018-02- 2021-03- 2019-10- / Consultant to develop Asset IBRD / 84060 Post Qualification 56,007.60 99,650.00 Completed 2019-10-28 Approaches International 19 18 01 17 31 23 06 09 06 31 Policy and Procedure Selection JM-MOFPS-141368-CS-CQS Strengthening Public Consultant 2019-05- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- / Market Demand Consultant IBRD / 84060 Investment Management Post Qualification Open - National 45,000.00 0.00 Canceled 2019-10-18 12 08 22 21 25 23 national sport museum System (PIMS) Selection JM-MOFPS-125783-CS-CQS / Architectural Consultancy services to prepare Strengthening Public Consultant preliminary, detailed designs 2019-08- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IBRD / 84060 Investment Management Post Qualification Open - National 55,750.00 0.00 Canceled 2019-10-18 and bill of quantities for the 04 08 22 21 25 23 System (PIMS) Selection proposed Fumigation Facility at the export complex in Kingston (PIEF) Project JM-MOFPS-113538-CS-QCBS / Consulting Firm to Plan Fostering Industrial Growth Quality And Cost- Open - 2020-04- 2019-05- 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-11- IBRD / 84060 Post 153,846.15 0.00 Canceled 2019-05-04 National Conference of and Trade Facilitation Based Selection International 10 25 08 05 04 09 13 12 Standards and Quality JM-MOFPS-139204-CS-CQS Consultant / Mentorship & Training for Adaptive Public Sector Open - 2019-12- 2019-10- 2020-01- 2019-12- 2020-01- 2020-02- 2021-02- IBRD / 84060 Post Qualification 45,000.00 0.00 Canceled 2019-10-08 Enterprise Architecture for E- Approaches International 12 29 21 12 11 15 09 Selection Gov JM-MOFPS-139210-CS-CQS / Consultancy Training for Information Technology (IT) Security Training for E-Gov (Course to include training in Consultant Adaptive Public Sector Open - 2019-12- 2019-10- 2020-01- 2019-12- 2020-01- 2020-02- 2021-02- computer forensics, ethical IBRD / 84060 Post Qualification 200,000.00 0.00 Canceled 2019-10-08 Approaches International 16 29 21 12 11 15 09 hacking, ISO27001, Selection Penetration testing, security incident response, security risk management and SIEM Admin) JM-MOFPS-139213-CS-CQS Consultant / Consultancy Service for Adaptive Public Sector Open - 2019-12- 2019-10- 2020-01- 2019-12- 2020-04- 2020-01- 2020-02- 2020-04- IBRD / 84060 Post Qualification 45,000.00 0.00 Canceled 2019-10-08 Business Analysis Training for Approaches International 12 29 21 12 03 11 15 15 Selection E-Gov JM-MOFPS-66558-CS-QCBS / Consultant to implement Adaptive Public Sector Quality And Cost- Open - 2018-08- 2018-09- 2018-10- 2018-11- 2018-12- 2019-02- 2020-02- IBRD / 84060 Post 750,000.00 0.00 Canceled 2018-07-24 Enterprise Risk Management Approaches Based Selection International 14 27 25 24 29 02 02 Project JM-MOFPS-142093-CS-QCBS / Consultant to implement Adaptive Public Sector Quality And Cost- Open - 2020-01- 2019-12- 2020-01- 2020-02- 2020-04- 2020-03- 2020-05- 2020-04- 2020-07- 2020-05- 2020-06- 2022-06- IBRD / 84060 Post 222,765.00 0.00 Canceled 2019-12-02 Enterprise Risk Management Approaches Based Selection International 15 23 21 05 20 04 28 03 08 08 12 12 Project JM-MOFPS-148630-CS-QCBS / Consultancy Firm to Adaptive Public Sector Quality And Cost- Open - 2020-02- 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2021-07- undertake the Strategic IBRD / 84060 Post 346,393.00 0.00 Canceled 2020-01-14 Approaches Based Selection International 04 19 16 16 20 25 25 Review of the Ministry of Science, Energy and Technology (MSET) JM-MOFPS-80191-CS-LCS / Adaptive Public Sector Least Cost 2019-06- 2018-10- 2019-06- 2018-12- 2019-01- 2019-02- 2019-03- 2019-04- 2019-10- External Audit Services for the IBRD / 84060 Prior Open - National 1,948,529.00 0.00 Canceled 2018-10-08 Approaches Selection 03 29 10 12 09 08 15 19 16 Auditor General`s Department JM-MOFPS-151081-CS-CQS Consultant Adaptive Public Sector Open - 2020-01- 2020-01- 2020-03- 2020-04- 2020-05- 2020-06- / Consultancy Service for IBRD / 84060 Post Qualification 30,000.00 0.00 Canceled 2019-12-29 Approaches International 15 19 03 02 07 06 Checkpoint Training for E- Selection Gov JM-MOFPS-151082-CS-CQS Consultant / Consultancy Service for Adaptive Public Sector Open - 2020-01- 2020-01- 2020-06- 2020-03- 2020-04- 2020-05- 2020-12- IBRD / 84060 Post Qualification 300,000.00 0.00 Canceled 2019-12-29 Training in Software Approaches International 15 19 03 03 02 07 03 Selection Development for E-Gov JM-MOFPS-114197-CS-QCBS / Consultant firm to Adaptive Public Sector Quality And Cost- Open - 2019-06- 2019-05- 2019-07- 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-11- undertake the Transformation IBRD / 84060 Post 473,606.00 0.00 Canceled 2019-05-08 Approaches Based Selection International 13 29 23 12 09 08 13 17 16 of the Companies Office of Jamaica JM-MOFPS-151766-CS-QCBS / Consultant Firm to Adaptive Public Sector Quality And Cost- Open - 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- 2020-04- 2020-05- 2020-06- 2020-07- 2021-07- Undertake the Transformation IBRD / 84060 Post 473,606.00 0.00 Canceled 2020-01-12 Approaches Based Selection International 15 02 25 17 27 14 14 18 23 23 of the Companies Office of Jamaica (COJ) JM-MOFPS-154025-CS-CQS / Consultancy to develop full project proposal/business Strengthening Public Consultant Open - 2020-02- 2020-02- 2020-02- 2020-03- 2020-04- 2020-05- 2021-02- case for the restoration, IBRD / 84060 Investment Management Post Qualification 250,000.00 0.00 Canceled 2020-01-19 International 11 09 25 24 23 28 22 reconstruction and adaptive System (PIMS) Selection reuse of the Old Naval Hospital & Park JM-MOFPS-163465-CS-CQS / Consultancy for the development of System Consultant Adaptive Public Sector 2020-04- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- Requirement Specification in IBRD / 84060 Post Qualification Open - National 62,000.00 0.00 Canceled 2020-03-09 Approaches 21 30 13 12 17 13 line with Government of Selection Jamaica (GOJ) asset policy procedures JM-MOFPS-163387-CS-LCS / External Audit Service for Adaptive Public Sector Least Cost Open - 2020-03- 2020-04- 2020-04- 2020-05- 2020-07- 2020-06- 2020-08- 2020-07- 2020-09- 2020-08- 2020-12- 2020-10- 2021-01- 2021-10- IBRD / 84060 Post 394,485.29 400,305.85 Signed 2020-03-22 Auditor General's Department Approaches Selection International 11 12 03 26 24 23 27 23 16 27 16 01 04 01 (AuDG) JM-MOFPS-237133-CS-QCBS / Strengthening the Plan and Implementation Framework of Strengthening Budget Vision 2030 Jamaica – Quality And Cost- Open - Under 2021-06- 2021-06- 2021-08- 2021-08- 2021-08- 2021-08- 2021-09- 2022-03- IBRD / 84060 Preparation Process and Post 151,409.50 0.00 2021-05-31 National Development Plan Based Selection International Implementation 02 14 04 04 13 27 14 13 Result Based Budgeting (NDP): Review and Update of the 28 Vision 2030 Jamaica – Sector Plans JM-MOFPS-237121-CS-QCBS / To Strengthen the Plan and Implementation Framework of Strengthening Budget Vision 2030 Jamaica - Quality And Cost- Open - Under 2021-06- 2021-06- 2021-08- 2021-08- 2021-08- 2021-08- 2021-09- 2022-03- IBRD / 84060 Preparation Process and Post 127,209.50 0.00 2021-05-31 National Development Plan Based Selection International Implementation 02 14 04 04 13 25 12 11 Result Based Budgeting (NDP): Costing of the Medium- Term Socio-Economic Policy Framework (MTF) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JM-MOFPS-35458-CS-INDV Strengthening Public Individual / Consultant to develop Under 2016-06- 2017-11- 2017-12- 2018-01- 2018-07- IBRD / 84060 Investment Management Post Consultant Limited 22,000.00 0.00 2017-11-06 Public Investment Implementation 15 11 02 06 05 System (PIMS) Selection Performance Report Page 6 JM-MOFPS-35478-CS-INDV Strengthening Public Individual 2017-12- 2017-12- 2018-01- 2018-07- / Consultant to design PIMS IBRD / 84060 Investment Management Post Consultant Limited 115,385.00 0.00 Canceled 2017-11-30 05 26 30 29 Curriculum System (PIMS) Selection JM-MOFPS-35488-CS-INDV Strengthening Public Individual 2017-05- 2017-11- 2016-12- 2017-12- 2017-06- 2018-01- 2017-06- 2018-07- 2019-09- / Communications Adviser, IBRD / 84060 Investment Management Post Consultant Limited 23,438.00 19,732.29 Completed 2017-11-06 16 11 01 02 12 06 19 11 27 PIMIS System (PIMS) Selection Strengthening Public Individual JM-MOFPS-35490-CS-INDV 2017-09- 2017-11- 2017-09- 2017-12- 2017-12- 2018-01- 2018-02- 2019-12- IBRD / 84060 Investment Management Post Consultant Limited 84,616.00 105,904.16 Signed 2017-11-06 / PIMIS Project Manager 05 11 06 02 18 06 01 07 System (PIMS) Selection JM-MOFPS-35496-CS-INDV Strengthening Budget Individual 2017-12- 2017-12- 2018-01- 2018-07- / Define/Refine Curriculum IBRD / 84060 Preparation Process and Post Consultant Limited 42,231.00 0.00 Canceled 2017-12-01 06 27 31 30 for MTRBB Courses Result Based Budgeting Selection JM-MOFPS-35673-CS-INDV / Consultant to develop Individual Fostering Industrial Growth 2017-12- 2018-01- 2018-02- 2018-08- Transition Plan to system IBRD / 84060 Post Consultant Open 85,000.00 0.00 Canceled 2017-11-09 and Trade Facilitation 28 18 22 21 (TRS) Technical Regulations Selection and Standards JM-MOFPS-37162-CS-CDS / Adaptive Public Sector 2015-11- 2017-12- 2018-06- 2018-02- 2018-07- 2018-08- 2019-07- Change Management IBRD / 84060 Post Direct Selection Direct 66,923.00 61,146.99 Completed 2017-11-30 Approaches 02 10 29 13 06 12 05 specialist renewal of contract JM-MOFPS-37207-CS-INDV Individual Adaptive Public Sector 2017-10- 2018-01- 2018-05- 2018-02- 2018-07- 2018-03- 2018-07- 2018-09- / Training and Development IBRD / 84060 Post Consultant Open 31,250.00 51,660.49 Signed 2017-12-04 Approaches 02 22 04 12 13 19 16 15 Consultant Selection JM-MOFPS-37209-CS-INDV Individual Adaptive Public Sector 2017-12- 2017-12- 2018-02- 2018-08- / Talent Acquisition IBRD / 84060 Post Consultant Limited 31,250.00 0.00 Canceled 2017-12-04 Approaches 09 30 03 02 Consultant Selection JM-MOFPS-37215-CS-INDV Strengthening Public Individual 2017-12- 2017-12- 2018-01- 2018-07- / Consultant to review PIMS IBRD / 84060 Investment Management Post Consultant Limited 39,063.00 0.00 Canceled 2017-12-01 06 27 31 30 Procedures (Handbook) System (PIMS) Selection JM-MOFPS-37221-CS-INDV Individual / Consultant to produce Adaptive Public Sector 2017-12- 2017-12- 2018-01- 2018-07- IBRD / 84060 Post Consultant Limited 19,532.00 0.00 Canceled 2017-12-01 documentary for change Approaches 06 27 31 30 Selection management Individual JM-MOFPS-37224-CS-INDV Adaptive Public Sector 2017-12- 2018-01- 2018-02- 2018-08- IBRD / 84060 Post Consultant Limited 31,250.00 0.00 Canceled 2017-12-11 / Job Analysis Consultant Approaches 16 06 10 09 Selection JM-MOFPS-35659-CS-INDV Strengthening Budget Individual 2018-01- 2018-01- 2018-03- 2018-09- / Citizens Budget and OGP IBRD / 84060 Preparation Process and Post Consultant Limited 62,600.00 0.00 Canceled 2018-01-05 10 31 07 03 Consultant Result Based Budgeting Selection Strengthening Budget Individual JM-MOFPS-35497-CS-INDV 2018-02- 2018-03- 2018-04- 2018-10- IBRD / 84060 Preparation Process and Post Consultant Limited 42,077.00 0.00 Canceled 2018-02-05 / Component Coordinator 10 03 07 04 Result Based Budgeting Selection JM-MOFPS-35672-CS-INDV Individual / Consultant for Fostering Industrial Growth 2018-01- 2018-02- 2018-03- 2018-09- IBRD / 84060 Post Consultant Limited 61,538.00 0.00 Canceled 2018-01-08 implementation of National and Trade Facilitation 13 03 10 06 Selection Quality Culture Strengthening Public Individual JM-MOFPS-35493-CS-INDV 2015-11- 2018-01- 2015-11- 2018-02- 2015-12- 2018-03- 2015-12- 2018-09- IBRD / 84060 Investment Management Post Consultant Limited 75,000.00 71,111.14 Signed 2018-01-22 / Project Analyst 01 27 09 17 01 24 01 20 System (PIMS) Selection Individual JM-MOFPS-37187-CS-INDV Adaptive Public Sector 2017-08- 2018-01- 2017-10- 2018-02- 2017-11- 2018-03- 2017-12- 2018-09- IBRD / 84060 Post Consultant Limited 38,462.00 37,037.05 Signed 2018-01-22 / ICT Support Consultant Approaches 26 27 09 17 11 24 11 20 Selection JM-MOFPS-35477-CS-INDV Strengthening Public Individual 2017-10- 2017-11- 2017-10- 2017-12- 2017-10- 2018-01- 2017-12- 2019-01- / Consultant/Technical IBRD / 84060 Investment Management Post Consultant Limited 62,500.00 88,253.47 Signed 2017-11-06 16 11 18 02 20 06 04 06 Coordinator System (PIMS) Selection JM-MOFPS-35479-CS-INDV Strengthening Public Individual 2019-03- 2018-01- 2017-08- 2018-01- 2017-09- 2018-03- 2017-09- 2018-09- / Pre- Investment Fund IBRD / 84060 Investment Management Post Consultant Limited 42,308.00 117,746.42 Signed 2018-01-05 20 10 03 31 04 07 04 03 Administrator System (PIMS) Selection JM-MOFPS-36874-CS-INDV Individual Fostering Industrial Growth 2017-06- 2017-12- 2018-02- 2017-12- 2018-05- 2018-01- 2018-05- 2018-07- 2019-02- / Consultant to complete IBRD / 84060 Post Consultant Limited 123,077.00 35,383.67 Completed 2017-11-30 and Trade Facilitation 11 05 13 26 21 30 21 29 15 system design Selection Strengthening Public Individual JM-MOFPS-35492-CS-INDV 2017-04- 2018-02- 2017-06- 2018-02- 2017-08- 2018-03- 2017-11- 2018-09- IBRD / 84060 Investment Management Post Consultant Limited 75,000.00 70,021.92 Signed 2018-01-29 / M & E Analyst 08 03 29 24 01 31 01 27 System (PIMS) Selection JM-MOFPS-35665-CS-INDV Individual Fostering Industrial Growth 2018-02- 2018-03- 2018-04- 2018-10- / Consultant to implement IBRD / 84060 Post Consultant Limited 30,769.00 0.00 Canceled 2018-02-15 and Trade Facilitation 20 13 17 14 Change Management , BSJ Selection JM-MOFPS-35669-CS-INDV Individual Fostering Industrial Growth 2018-02- 2018-03- 2018-04- 2018-10- / Consultant to implement IBRD / 84060 Post Consultant Limited 15,385.00 0.00 Canceled 2018-02-21 and Trade Facilitation 26 19 23 20 Needs Assessment Findings Selection JM-MOFPS-35671-CS-INDV Individual / Consultant for Fostering Industrial Growth 2018-01- 2018-02- 2018-03- 2018-09- IBRD / 84060 Post Consultant Limited 38,462.00 0.00 Canceled 2018-01-08 implementation of National and Trade Facilitation 13 03 10 06 Selection Quality Policy Strengthening Public Individual JM-MOFPS-42758-CS-INDV 2018-02- 2018-02- 2018-03- 2018-09- IBRD / 84060 Investment Management Post Consultant Limited 21,539.00 0.00 Canceled 2018-01-29 / Design PIMS website 03 24 31 27 System (PIMS) Selection JM-MOFPS-37176-CS-INDV Individual Adaptive Public Sector 2017-06- 2018-01- 2017-07- 2018-02- 2017-07- 2018-03- 2017-07- 2018-09- 2018-06- / Business process Review IBRD / 84060 Post Consultant Limited 16,500.00 66,666.69 Completed 2018-01-22 Approaches 23 27 03 17 31 24 31 20 30 Specialists Selection Individual JM-MOFPS-37178-CS-INDV Adaptive Public Sector 2018-01- 2018-02- 2018-03- 2018-09- IBRD / 84060 Post Consultant Limited 18,000.00 0.00 Canceled 2018-01-15 / HR Specialists Approaches 20 10 17 13 Selection Individual JM-MOFPS-37181-CS-INDV Adaptive Public Sector 2018-02- 2018-03- 2018-04- 2018-10- IBRD / 84060 Post Consultant Limited 115,285.00 0.00 Canceled 2018-02-08 / Special Projects BPR Approaches 13 06 10 07 Selection JM-MOFPS-37220-CS-INDV Individual Fostering Industrial Growth 2018-01- 2018-02- 2018-03- 2018-09- / Consultant to implement IBRD / 84060 Post Consultant Limited 34,615.00 0.00 Canceled 2018-01-22 and Trade Facilitation 27 17 24 20 transition plan Selection Individual JM-MOFPS-37174-CS-INDV Adaptive Public Sector 2018-01- 2018-02- 2018-03- 2018-09- IBRD / 84060 Post Consultant Open 4,615.00 0.00 Canceled 2017-11-30 / Process Review Specialists Approaches 18 08 15 11 Selection JM-MOFPS-37183-CS-INDV Individual Adaptive Public Sector 2018-01- 2018-02- 2018-03- 2018-09- / Special Projects HR IBRD / 84060 Post Consultant Limited 57,692.00 0.00 Canceled 2018-01-15 Approaches 20 10 17 13 Management Selection JM-MOFPS-55468-CS-INDV Strengthening Budget Individual / Curriculum Development 2018-05- 2018-06- 2018-07- 2019-01- IBRD / 84060 Preparation Process and Post Consultant Open 200,000.00 0.00 Canceled 2018-04-02 and Training in Medium term 21 11 16 12 Result Based Budgeting Selection Results Based Budgeting JM-MOFPS-55477-CS-INDV Strengthening Budget Individual 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2018-11- 2018-12- / Team Lead for Medium IBRD / 84060 Preparation Process and Post Consultant Open 200,000.00 70,000.00 Completed 2018-04-02 01 21 04 11 27 16 27 13 17 Term Results Based Result Based Budgeting Selection Budgeting Page 7 JM-MOFPS-56481-CS-INDV Strengthening Public Individual 2018-06- 2018-07- 2018-08- 2019-02- / Enterprise Risk Management IBRD / 84060 Investment Management Post Consultant Open 30,333.33 0.00 Canceled 2018-04-25 13 04 08 04 - Project Manager System (PIMS) Selection JM-MOFPS-56483-CS-INDV Strengthening Public Individual 2018-06- 2018-07- 2018-08- 2019-02- / Project Managt - Project IBRD / 84060 Investment Management Post Consultant Open 43,333.33 0.00 Canceled 2018-04-30 18 09 13 09 Manager System (PIMS) Selection JM-MOFPS-56526-CS-INDV Individual Fostering Industrial Growth 2018-09- 2018-10- 2018-11- 2019-03- / Implementation of Techncial IBRD / 84060 Post Consultant Limited 77,777.78 0.00 Canceled 2018-09-17 and Trade Facilitation 22 13 17 17 Regulations Transition Plan Selection JM-MOFPS-56535-CS-INDV Individual / Modernization and upgrade Fostering Industrial Growth 2021-05- 2018-08- 2020-04- 2018-08- 2021-04- 2018-10- 2021-05- 2019-03- IBRD / 84060 Post Consultant Open 74,000.00 33,418.00 Signed 2018-06-18 of capabilities Time and and Trade Facilitation 19 06 20 27 13 01 10 30 Selection frequency lab consultancy JM-MOFPS-56605-CS-INDV / Consultancy to develop Individual Fostering Industrial Growth 2018-07- 2018-12- 2019-02- 2018-12- 2019-02- 2019-01- 2019-03- 2019-04- strategy on implementation IBRD / 84060 Post Consultant Open 133,334.00 62,520.95 Signed 2018-10-15 and Trade Facilitation 31 03 01 24 01 28 18 28 of NQP -building a national Selection quality culture JM-MOFPS-56643-CS-INDV Individual Fostering Industrial Growth 2018-12- 2018-12- 2019-01- 2019-05- / Implementation of NQP IBRD / 84060 Post Consultant Open 37,037.00 0.00 Canceled 2018-10-15 and Trade Facilitation 03 24 28 08 Strategy Selection JM-MOFPS-56644-CS-INDV Individual / Consultant to implement Fostering Industrial Growth 2018-01- 2018-09- 2018-11- 2018-10- 2018-12- 2018-11- 2019-01- 2019-05- 2020-01- IBRD / 84060 Post Consultant Open 103,704.00 100,390.65 Completed 2018-07-23 chnage management and Trade Facilitation 04 10 12 01 03 05 17 04 31 Selection recommendations JM-MOFPS-56650-CS-INDV Individual Fostering Industrial Growth 2018-12- 2018-12- 2019-01- 2019-03- / NBCJ competence building IBRD / 84060 Post Consultant Open 102,222.00 0.00 Canceled 2018-10-15 and Trade Facilitation 03 24 28 14 for accreditation to offer ISO Selection JM-MOFPS-56785-CS-CDS / Public Sector Leadership Adaptive Public Sector 2018-06- 2018-05- 2018-07- 2019-01- Training Programme and IBRD / 84060 Prior Direct Selection Direct 160,493.83 0.00 Canceled 2018-05-07 Approaches 21 17 21 17 Leadership Development Certification JM-MOFPS-56786-CS-INDV Individual Adaptive Public Sector 2017-10- 2018-06- 2018-03- 2018-07- 2018-05- 2018-08- 2018-05- 2019-03- / Head, Project Management IBRD / 84060 Post Consultant Open 111,111.11 28,169.00 Terminated 2018-05-07 Approaches 31 25 21 16 01 20 01 28 Officer Selection JM-MOFPS-56930-CS-INDV Strengthening Public Individual / Technical Consultnat MiND 2019-11- 2018-06- 2018-07- 2018-08- 2019-02- IBRD / 84060 Investment Management Post Consultant Open 50,000.00 0.00 Canceled 2018-05-07 Expansion and Upgrading 21 25 16 20 16 System (PIMS) Selection Project JM-MOFPS-35674-CS-INDV Individual Fostering Industrial Growth 2018-03- 2018-03- 2018-04- 2018-10- / Consultant Implementation IBRD / 84060 Post Consultant Limited 34,615.00 0.00 Canceled 2018-02-28 and Trade Facilitation 05 26 30 27 of Transition Plan Selection Strengthening Public Individual JM-MOFPS-56474-CS-INDV 2018-05- 2018-07- 2015-10- 2018-07- 2015-10- 2018-09- 2015-07- 2019-03- IBRD / 84060 Investment Management Post Consultant Open 25,925.93 22,000.00 Signed 2018-05-21 / Consultant to Review PSIP 23 09 29 30 29 03 06 02 System (PIMS) Selection Individual JM-MOFPS-62146-CS-CDS / Fostering Industrial Growth 2018-06- 2018-07- 2018-08- 2019-02- IBRD / 84060 Prior Consultant Open 123,000.00 0.00 Canceled 2018-05-10 Quality Systems Technician and Trade Facilitation 28 19 23 19 Selection JM-MOFPS-62186-CS-INDV / Lead Auditor/ consultant to Individual conduct 9001 Certification Fostering Industrial Growth 2018-05- 2018-05- 2018-06- 2018-07- 2019-01- IBRD / 84060 Post Consultant Limited 72,000.00 0.00 Canceled 2018-05-10 Audit and Accreditation and Trade Facilitation 15 15 05 10 06 Selection report for Lot 1 entities (MIND, PICA &RGD) JM-MOFPS-62187-CS-INDV Individual / Auditor to conduct mock Fostering Industrial Growth 2018-05- 2018-06- 2018-07- 2019-01- IBRD / 84060 Post Consultant Limited 2,000.00 0.00 Canceled 2018-05-11 9001 Certification Audit for and Trade Facilitation 16 06 11 07 Selection JBDC JM-MOFPS-62188-CS-INDV Individual Adaptive Public Sector 2018-07- 2018-07- 2018-08- 2019-02- / Consultant Quality and Test IBRD / 84060 Prior Consultant Open 32,000.00 0.00 Canceled 2018-05-14 Approaches 02 23 27 23 Manager Selection JM-MOFPS-62189-CS-INDV Individual Adaptive Public Sector 2018-06- 2018-07- 2018-08- 2019-02- / Consultant Facilities IBRD / 84060 Post Consultant Open 56,000.00 0.00 Canceled 2018-05-10 Approaches 28 19 23 19 Management Officer Selection Individual JM-MOFPS-62190-CS-INDV Adaptive Public Sector 2018-02- 2018-06- 2018-04- 2018-07- 2018-07- 2018-08- 2018-07- 2019-02- IBRD / 84060 Post Consultant Open 72,000.00 92,988.88 Signed 2018-05-11 / Project Manager ICT Approaches 01 29 27 20 02 24 09 20 Selection Individual JM-MOFPS-62191-CS-INDV Adaptive Public Sector 2018-01- 2018-07- 2018-06- 2018-07- 2018-09- 2018-08- 2018-09- 2019-02- 2019-09- IBRD / 84060 Post Consultant Open 72,000.00 66,420.63 Completed 2018-05-14 / Project Manager, Legal Approaches 03 02 27 23 03 27 10 23 09 Selection Individual JM-MOFPS-62283-CS-INDV Adaptive Public Sector 2018-01- 2018-07- 2018-06- 2018-07- 2018-07- 2018-09- 2018-07- 2019-03- IBRD / 84060 Post Consultant Open 24,000.00 42,250.91 Terminated 2018-05-21 / Project Administrator Approaches 02 09 18 30 10 03 16 02 Selection JM-MOFPS-62284-CS-INDV Individual Adaptive Public Sector 2018-07- 2018-07- 2018-11- 2018-08- 2019-01- 2018-09- 2019-01- 2019-03- 2020-01- / Project Manager, Human IBRD / 84060 Post Consultant Open 60,000.00 44,280.42 Completed 2018-05-28 Approaches 02 16 02 06 03 10 14 09 13 Resource Selection Individual JM-MOFPS-62285-CS-INDV Adaptive Public Sector 2018-06- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-10- 2019-03- 2019-12- IBRD / 84060 Post Consultant Open 60,000.00 31,592.34 Completed 2018-05-28 / Change Management Expert Approaches 22 16 24 06 03 10 16 09 16 Selection Individual JM-MOFPS-62286-CS-INDV Adaptive Public Sector 2018-09- 2018-07- 2018-12- 2018-08- 2018-12- 2018-09- 2019-03- 2019-03- IBRD / 84060 Post Consultant Open 40,000.00 36,937.15 Signed 2018-05-28 / Financial Analyst Consultant Approaches 05 16 05 06 28 10 01 09 Selection JM-MOFPS-62287-CS-INDV Individual Adaptive Public Sector 2018-01- 2018-07- 2018-07- 2018-08- 2018-12- 2018-09- 2019-01- 2019-03- / Management Analyst IBRD / 84060 Post Consultant Open 40,000.00 55,350.53 Signed 2018-05-28 Approaches 03 16 20 06 19 10 02 09 Consultant Selection JM-MOFPS-62289-CS-INDV Individual Adaptive Public Sector 2018-05- 2018-07- 2019-02- 2018-07- 2019-06- 2018-08- 2019-06- 2019-02- / Partner Liaison Strategic IBRD / 84060 Post Consultant Open 60,000.00 37,037.05 Signed 2018-05-14 Approaches 02 02 05 23 03 27 03 23 Development Selection Individual JM-MOFPS-62306-CS-INDV Fostering Industrial Growth Under 2018-05- 2018-05- 2018-05- 2018-06- 2020-09- 2018-07- 2019-01- IBRD / 84060 Post Consultant Direct 6,706.00 0.00 2018-05-10 / Technical Advisor and Trade Facilitation Implementation 15 20 15 10 15 15 11 Selection JM-MOFPS-66429-CS-CDS / Consulting services to support the Transition of Adaptive Public Sector 2017-10- 2018-06- 2018-04- 2018-08- 2018-07- 2019-02- 2018-11- IBRD / 84060 Post Direct Selection Direct 7,800.00 6,400.00 Completed 2018-06-12 Centralization of Legal Approaches 02 22 24 26 09 22 06 Services under the Government of Jamaica. JM-MOFPS-66421-CS-INDV / Procurement of Solution Architect for the Individual Adaptive Public Sector 2017-06- 2018-09- 2018-02- 2018-10- 2018-06- 2018-11- 2018-07- 2019-05- implementation of Electronic IBRD / 84060 Post Consultant Open 78,094.90 93,861.42 Signed 2018-07-24 Approaches 01 11 07 02 28 06 01 05 Enterprise Content Selection Management for the Government of Jamaica. Page 8 JM-MOFPS-66426-CS-INDV / Procurement of Solution Architect for the Individual Adaptive Public Sector 2017-09- 2018-07- 2017-11- 2018-08- 2018-07- 2018-09- 2018-07- 2019-03- implementation of Electronic IBRD / 84060 Post Consultant Limited 78,094.90 93,186.02 Signed 2018-07-24 Approaches 25 29 06 19 02 23 08 22 Enterprise Content Selection Management for the Government of Jamaica. JM-MOFPS-66424-CS-INDV / Procurement of Solution Architect for the Individual Adaptive Public Sector 2019-10- 2018-09- 2019-12- 2018-10- 2020-01- 2018-11- 2020-02- 2019-05- implementation of Electronic IBRD / 84060 Post Consultant Open 78,094.90 124,300.48 Signed 2018-07-24 Approaches 25 11 06 02 02 06 17 05 Enterprise Content Selection Management for the Government of Jamaica. JM-MOFPS-66420-CS-INDV / Procurement of Solution Architect for the Individual Adaptive Public Sector 2019-04- 2018-07- 2019-03- 2018-08- 2019-06- 2018-09- 2019-07- 2019-03- 2019-12- implementation of Electronic IBRD / 84060 Post Consultant Limited 78,094.90 23,465.36 Completed 2018-07-24 Approaches 03 29 20 19 27 23 01 22 31 Enterprise Content Selection Management for the Government of Jamaica. JM-MOFPS-66422-CS-INDV / Procurement of Solution Architect for the Individual Adaptive Public Sector 2018-07- 2018-08- 2018-09- 2019-03- implementation of Electronic IBRD / 84060 Post Consultant Limited 78,094.90 0.00 Canceled 2018-07-24 Approaches 29 19 23 22 Enterprise Content Selection Management for the Government of Jamaica. JM-MOFPS-66425-CS-INDV / Procurement of Solution Architect for the Individual Adaptive Public Sector 2017-09- 2018-07- 2017-11- 2018-08- 2018-02- 2018-09- 2018-09- 2019-03- implementation of Electronic IBRD / 84060 Post Consultant Limited 78,094.90 93,186.02 Signed 2018-07-24 Approaches 25 29 06 19 07 23 10 22 Enterprise Content Selection Management for the Government of Jamaica. JM-MOFPS-66427-CS-INDV / Procurement of Solution Architect for the Individual Adaptive Public Sector 2017-09- 2018-07- 2017-11- 2018-08- 2018-02- 2018-09- 2018-07- 2019-03- implementation of Electronic IBRD / 84060 Post Consultant Limited 78,094.90 93,186.02 Signed 2018-07-24 Approaches 25 29 06 19 07 23 09 22 Enterprise Content Selection Management for the Government of Jamaica. JM-MOFPS-66428-CS-INDV / Procurement of Solution Architect for the Individual Adaptive Public Sector 2017-09- 2018-07- 2017-11- 2018-08- 2018-02- 2018-09- 2018-07- 2019-03- implementation of Electronic IBRD / 84060 Post Consultant Limited 78,094.90 93,186.02 Signed 2018-07-24 Approaches 25 29 06 19 07 23 10 22 Enterprise Content Selection Management for the Government of Jamaica. JM-MOFPS-66531-CS-INDV Strengthening Budget Individual 2018-09- 2018-10- 2018-11- 2019-05- / Programme Rationalisation IBRD / 84060 Preparation Process and Post Consultant Open 130,000.00 0.00 Canceled 2018-07-24 11 02 06 05 Consultant MTRBB Result Based Budgeting Selection JM-MOFPS-66527-CS-INDV Strengthening Budget Individual 2018-09- 2018-10- 2018-11- 2019-05- / Programme Rationalisation IBRD / 84060 Preparation Process and Post Consultant Open 130,000.00 0.00 Canceled 2018-07-24 11 02 06 05 Consultant MTRBB Result Based Budgeting Selection JM-MOFPS-66530-CS-INDV Strengthening Budget Individual 2018-09- 2018-10- 2018-11- 2019-05- / Programme Rationalisation IBRD / 84060 Preparation Process and Post Consultant Open 130,000.00 0.00 Canceled 2018-07-24 11 02 06 05 Consultant MTRBB Result Based Budgeting Selection JM-MOFPS-68236-CS-INDV Strengthening Public Individual 2018-08- 2018-09- 2018-10- 2019-04- / Joint Venture Policy IBRD / 84060 Investment Management Prior Consultant Open 65,800.00 0.00 Canceled 2018-07-12 30 20 25 23 Consultant System (PIMS) Selection JM-MOFPS-73271-CS-INDV Strengthening Public Individual / Business Analyst, Public 2018-09- 2018-09- 2018-12- 2018-10- 2019-03- 2018-11- 2019-03- 2019-05- IBRD / 84060 Investment Management Post Consultant Open 72,000.00 46,043.79 Signed 2018-08-08 Investment Management 14 26 13 17 01 21 01 20 System (PIMS) Selection Information System JM-MOFPS-73278-CS-INDV Strengthening Public Individual / Technical Assistance to 2018-09- 2018-09- 2019-02- 2018-10- 2019-02- 2018-11- 2019-02- 2019-05- 2020-01- IBRD / 84060 Investment Management Post Consultant Open 18,000.00 67,986.17 Completed 2018-08-08 support Public Bodies in the 18 26 04 17 04 21 04 20 25 System (PIMS) Selection implementation of the PIMS JM-MOFPS-80195-CS-INDV Individual Adaptive Public Sector 2018-08- 2018-10- 2018-08- 2018-11- 2019-04- 2018-12- 2019-04- 2019-06- 2019-12- / Corporate Social IBRD / 84060 Post Consultant Limited 58,080.00 35,211.25 Completed 2018-10-08 Approaches 10 13 29 03 08 08 08 06 31 Responsibility Consultant Selection JM-MOFPS-80203-CS-INDV Individual Adaptive Public Sector 2015-12- 2018-12- 2016-01- 2018-12- 2016-04- 2019-01- 2016-04- 2019-07- 2016-07- / Organizational IBRD / 84060 Post Consultant Limited 66,176.47 25,025.91 Completed 2018-11-23 Approaches 28 03 13 24 01 28 04 27 15 Development Specialist Selection JM-MOFPS-81822-CS-INDV Individual / Communications Consultant Adaptive Public Sector 2019-01- 2019-01- 2019-03- 2019-08- IBRD / 84060 Post Consultant Open 44,116.65 0.00 Canceled 2018-11-16 for Centralization of Legal Approaches 04 25 01 28 Selection Services JM-MOFPS-81823-CS-INDV Individual / Records Management Adaptive Public Sector 2018-12- 2019-01- 2019-11- 2019-02- 2019-11- 2019-03- 2020-02- 2019-09- 2021-02- IBRD / 84060 Post Consultant Open 8,823.53 10,178.12 Completed 2018-11-16 Assistant for Centralization of Approaches 12 22 27 12 28 19 17 15 15 Selection Legal Services JM-MOFPS-83475-CS-INDV Strengthening Budget Individual / Open Government National 2018-08- 2018-11- 2018-10- 2018-11- 2018-12- 2018-12- 2018-12- 2019-06- 2019-06- IBRD / 84060 Preparation Process and Post Consultant Limited 37,000.00 31,968.18 Completed 2018-10-30 Action Plan (OGP ) Lead 17 04 24 25 03 30 03 28 30 Result Based Budgeting Selection Consultant JM-MOFPS-83477-CS-INDV Strengthening Budget Individual 2018-08- 2018-11- 2018-10- 2018-11- 2018-12- 2018-12- 2018-12- 2019-06- 2019-06- / Open Government National IBRD / 84060 Preparation Process and Post Consultant Limited 37,000.00 32,822.78 Completed 2018-10-30 21 04 31 25 03 30 03 28 30 Action Plan (OGP ) Result Based Budgeting Selection Coordinator JM-MOFPS-83480-CS-INDV Individual Fostering Industrial Growth 2019-01- 2019-01- 2019-07- 2019-02- 2019-09- 2019-03- 2019-10- 2019-09- / Client Services Consultant, IBRD / 84060 Post Consultant Open 128,000.00 126,175.20 Signed 2018-12-03 and Trade Facilitation 03 21 03 11 04 18 14 14 BSJ Selection Individual JM-MOFPS-83483-CS-INDV Adaptive Public Sector 2018-09- 2018-12- 2019-03- 2019-01- 2019-04- 2019-02- 2019-04- 2019-08- IBRD / 84060 Post Consultant Open 111,000.00 200,500.00 Terminated 2018-10-23 / JIFMIS Project Manager Approaches 20 11 15 01 08 05 08 04 Selection JM-MOFPS-83487-CS-INDV Strengthening Public Individual / Consultant to develop 2018-11- 2018-12- 2019-08- 2019-01- 2019-08- 2019-02- 2019-10- 2019-08- 2020-06- IBRD / 84060 Investment Management Post Consultant Open 12,000.00 12,443.51 Completed 2018-11-09 Business Plan -Jamaica Music 18 28 07 18 07 22 28 21 30 System (PIMS) Selection Museum (PIEF) JM-MOFPS-83490-CS-INDV Strengthening Public Individual / 3 D Designer Multimedia 2019-01- 2019-02- 2019-03- 2019-09- IBRD / 84060 Investment Management Post Consultant Open 6,500.00 0.00 Canceled 2018-11-23 Content Specialist Jamaica 11 01 08 04 System (PIMS) Selection Music Museum (PIEF) JM-MOFPS-83525-CS-INDV / Consultant to develop Strengthening Public 2021-04- 2018-12- 2019-02- 2019-02- 2019-03- 2019-06- 2019-08- Project Proposal -Banana IBRD / 84060 Investment Management Post Direct Selection Direct 45,100.00 44,304.03 Completed 2018-11-23 19 03 06 06 04 06 30 Board Climate Smart System (PIMS) Agriculture Project (PIEF) JM-MOFPS-83624-CS-INDV Individual Adaptive Public Sector 2019-01- 2019-01- 2019-03- 2019-08- / Project Manager for IBRD / 84060 Post Consultant Open 66,176.47 0.00 Canceled 2018-11-16 Approaches 04 25 01 28 Companies Office of Jamaica. Selection JM-MOFPS-83660-CS-INDV Individual Adaptive Public Sector 2015-03- 2019-05- 2015-06- 2019-06- 2015-07- 2019-07- 2015-08- 2020-01- / Change Management IBRD / 84060 Post Consultant Open 51,470.59 150,000.00 Terminated 2019-04-08 Approaches 26 27 23 17 02 22 17 18 Specialist Selection Page 9 JM-MOFPS-85863-CS-CDS / Consultant to develop a Adaptive Public Sector 2018-12- 2019-02- 2019-08- business case for prior option IBRD / 84060 Post Direct Selection Direct 150,000.00 0.00 Canceled 2018-11-30 Approaches 10 13 12 for the Department of Correctional Services. JM-MOFPS-86474-CS-CDS / Deputy Programme Manager Adaptive Public Sector 2018-04- 2018-11- 2018-11- 2019-02- 2018-12- 2019-08- 2020-05- IBRD / 84060 Post Direct Selection Direct 65,384.62 88,253.47 Completed 2018-11-19 for Electronic Content Approaches 02 29 21 02 10 01 07 Management project. JM-MOFPS-86475-CS-CDS / Adaptive Public Sector 2018-04- 2018-11- 2018-11- 2019-02- 2018-12- 2019-08- Project Manager for Electronic IBRD / 84060 Post Direct Selection Direct 76,923.08 66,239.17 Signed 2018-11-19 Approaches 09 29 21 02 10 01 Content Management Project JM-MOFPS-56813-CS-INDV Individual Adaptive Public Sector 2018-06- 2018-07- 2018-08- 2019-02- / Project Manager IBRD / 84060 Post Consultant Open 72,000.00 0.00 Canceled 2018-04-30 Approaches 18 09 13 09 (MICAF/eGOV) Selection JM-MOFPS-97141-CS-CDS / Public Sector Leadership Adaptive Public Sector 2018-01- 2019-02- 2019-07- 2019-04- 2019-10- 2019-10- Training Programme and IBRD / 84060 Post Direct Selection Direct 311,230.45 280,235.03 Signed 2019-01-31 Approaches 04 10 01 16 07 13 Leadership Development Certification JM-MOFPS-97680-CS-INDV Individual Adaptive Public Sector 2019-03- 2019-04- 2019-05- 2019-11- / Consultant Quality and Test IBRD / 84060 Post Consultant Open 32,000.00 0.00 Canceled 2019-01-30 Approaches 20 10 15 11 Manager Selection JM-MOFPS-97681-CS-INDV Strengthening Public Individual 2018-11- 2019-03- 2019-05- 2019-04- 2019-07- 2019-05- 2019-07- 2019-11- 2020-12- / Joint Venture Policy IBRD / 84060 Investment Management Post Consultant Open 65,800.00 61,125.85 Completed 2019-01-30 18 20 27 10 11 15 15 11 31 Consultant System (PIMS) Selection Individual JM-MOFPS-98747-CS-INDV Fostering Industrial Growth Under 2018-04- 2019-03- 2018-05- 2019-04- 2018-06- 2019-05- 2019-11- IBRD / 84060 Post Consultant Open 123,000.00 12,519.09 2019-02-04 / Quality Systems Technicians and Trade Facilitation Implementation 30 25 22 15 18 20 16 Selection Individual JM-MOFPS-37211-CS-INDV Adaptive Public Sector 2017-12- 2017-12- 2018-02- 2018-08- IBRD / 84060 Post Consultant Limited 31,250.00 0.00 Canceled 2017-12-04 / Client Services Consultant Approaches 09 30 03 02 Selection JM-MOFPS-113386-CS-INDV / Consultant to Develop Individual Strategy for building and Fostering Industrial Growth Under 2019-09- 2019-06- 2020-02- 2019-07- 2019-08- 2020-02- IBRD / 84060 Post Consultant Open 82,500.00 0.00 2019-05-03 Accreditation Based and Trade Facilitation Implementation 09 21 11 12 16 12 Selection Conformity Assessment System (ABCAS) for Jamaica JM-MOFPS-113390-CS-INDV Strengthening Public Individual 2019-06- 2019-07- 2019-08- 2020-02- / Engagement of short-term IBRD / 84060 Investment Management Post Consultant Open 32,285.00 0.00 Canceled 2019-05-03 21 12 16 12 Project Analysts x 2 System (PIMS) Selection JM-MOFPS-113393-CS-INDV Strengthening Public Individual 2019-05- 2019-06- 2019-07- 2019-08- 2020-02- / PIMIS Application IBRD / 84060 Investment Management Post Consultant Open 31,717.00 0.00 Canceled 2019-05-03 31 21 12 16 12 Administrator System (PIMS) Selection JM-MOFPS-113402-CS-INDV / Consultant to undertake a Strengthening Budget Individual comprehensive review of the 2019-06- 2019-07- 2019-08- 2020-02- IBRD / 84060 Preparation Process and Post Consultant Open 44,403.00 0.00 Canceled 2019-05-03 technology environment to 21 12 16 12 Result Based Budgeting Selection effectively support MTRBB implementation JM-MOFPS-113511-CS-INDV / Consultant to Develop Strengthening Public Individual Business Case/Project 2020-01- 2019-06- 2019-07- 2019-08- 2020-02- IBRD / 84060 Investment Management Post Consultant Open 30,500.00 0.00 Canceled 2019-05-04 Proposal for UTECH Regional 05 22 13 17 13 System (PIMS) Selection Institute for Excellence in Computing and Engineering JM-MOFPS-113518-CS-INDV Individual Adaptive Public Sector 2019-05- 2019-05- 2019-07- 2019-12- / Upgrade Attorney General's IBRD / 84060 Post Consultant Limited 52,000.00 0.00 Canceled 2019-05-04 Approaches 09 30 04 31 Chambers Network Selection JM-MOFPS-113541-CS-INDV Individual / Consultant to develop Adaptive Public Sector 2019-01- 2019-05- 2019-01- 2019-05- 2019-05- 2019-07- 2019-05- 2019-12- 2019-12- IBRD / 84060 Post Consultant Limited 33,834.59 33,451.02 Completed 2019-05-04 guidelines for office of the Approaches 03 09 08 30 16 04 20 31 31 Selection Governor General JM-MOFPS-113542-CS-INDV Individual Adaptive Public Sector 2019-03- 2019-06- 2019-07- 2019-08- 2020-02- / Business Analyst IBRD / 84060 Post Consultant Open 36,801.75 0.00 Canceled 2019-05-04 Approaches 01 22 13 17 13 (replacement position PMO) Selection JM-MOFPS-113547-CS-INDV / Organizational Individual Adaptive Public Sector 2019-03- 2019-06- 2019-04- 2019-07- 2019-07- 2019-08- 2019-08- 2020-02- Development Specialist , IBRD / 84060 Post Consultant Open 36,801.75 36,937.15 Signed 2019-05-04 Approaches 10 22 30 13 15 17 02 13 Centralization of Legal Selection Services Project Development Specialist JM-MOFPS-113829-CS-INDV / Consultant for the Strengthening Public Individual preparation of a project 2019-06- 2019-07- 2019-08- 2020-02- IBRD / 84060 Investment Management Post Consultant Open 30,200.00 0.00 Canceled 2019-05-06 proposal for the STC Modern 24 15 19 15 System (PIMS) Selection Language Centre of Excellence (Short wood Teachers College) JM-MOFPS-114182-CS-INDV / Consultant for the Strengthening Public Individual preparation of a project 2019-06- 2019-06- 2019-08- 2019-07- 2019-10- 2019-08- 2019-10- 2020-02- 2020-03- IBRD / 84060 Investment Management Post Consultant Open 30,200.00 29,833.83 Completed 2019-05-08 proposal for the STC Modern 04 26 20 17 28 21 28 17 31 System (PIMS) Selection Language Center of Excellence (Short wood Teachers College) JM-MOFPS-113394-CS-INDV Strengthening Public Individual 2019-11- 2019-06- 2020-02- 2019-07- 2020-04- 2019-08- 2020-04- 2020-08- / PIMIS Application IBRD / 84060 Investment Management Post Consultant Open 67,200.00 30,544.70 Signed 2019-05-03 18 21 03 12 01 16 01 10 Administrator System (PIMS) Selection JM-MOFPS-113397-CS-INDV Individual / Project Manager to Fostering Industrial Growth 2019-06- 2019-07- 2019-08- 2020-08- IBRD / 84060 Post Consultant Open 87,897.00 0.00 Canceled 2019-05-03 Implement the ICT Upgraded and Trade Facilitation 21 12 16 10 Selection Strategic Plan for the BSJ JM-MOFPS-113399-CS-INDV / Consultant to develop and Strengthening Budget Individual implement a change 2019-06- 2019-07- 2019-08- 2020-08- IBRD / 84060 Preparation Process and Post Consultant Open 73,328.00 0.00 Canceled 2019-05-03 management and 21 12 16 10 Result Based Budgeting Selection communication strategy/plan for the MTRBB JM-MOFPS-113400-CS-INDV / Consultant to support establishing and clarifying Strengthening Budget Individual PEX and other key 2019-06- 2019-07- 2019-08- 2020-08- IBRD / 84060 Preparation Process and Post Consultant Open 80,239.00 0.00 Canceled 2019-05-03 stakeholders' roles and 21 12 16 10 Result Based Budgeting Selection responsibilities as well as redefining all necessary working arrangements JM-MOFPS-113401-CS-INDV / Consultant to to complete the rationalisation of the PEX Strengthening Budget Individual 2019-06- 2019-07- 2019-08- 2020-08- Division and the IBRD / 84060 Preparation Process and Post Consultant Open 56,835.82 0.00 Canceled 2019-05-03 21 12 16 10 Establishment and Result Based Budgeting Selection operationalisation of a dedicated M&E function in PEX Page 10 JM-MOFPS-113403-CS-INDV / Consultant to strengthen the quality of strategic Strengthening Budget Individual 2019-06- 2019-07- 2019-08- 2020-08- business plans in terms of IBRD / 84060 Preparation Process and Post Consultant Open 51,172.00 0.00 Canceled 2019-05-03 21 12 16 10 refinement of strategic Result Based Budgeting Selection objectives and achieving their alignment with programme objectives JM-MOFPS-113404-CS-INDV / Consultant for the development of proposals and Business Plans for Specified Public Sector/MDAs Strengthening Public Individual 2019-06- 2019-07- 2019-08- 2020-02- (Six (6) short-term IBRD / 84060 Investment Management Post Consultant Open 30,000.00 0.00 Canceled 2019-05-03 21 12 16 12 Consultants). This will be a System (PIMS) Selection pool of consultants who will be engaged for the preparation of the required documentation under the PIEF. JM-MOFPS-113512-CS-INDV / Project Development/Management Strengthening Public Individual Consultant to Develop 2019-06- 2019-06- 2019-12- 2019-07- 2020-01- 2019-08- 2020-01- 2020-02- IBRD / 84060 Investment Management Post Consultant Open 33,600.00 30,388.90 Signed 2019-05-04 Business Case and Revised 25 22 17 13 13 17 13 13 System (PIMS) Selection Business Plan for Usain Bolt Sport and Exercise Medicine Center JM-MOFPS-113517-CS-INDV / Project Manager for the Individual Implementation of the Adaptive Public Sector 2019-06- 2019-07- 2019-08- 2020-08- IBRD / 84060 Post Consultant Open 97,744.36 0.00 Canceled 2019-05-04 Recommendation of the Approaches 22 13 17 11 Selection Strategic Review, Ministry of National Security JM-MOFPS-113519-CS-INDV / Legal Services Consultant Individual Adaptive Public Sector 2019-06- 2019-07- 2019-08- 2020-08- Establishment of the New ICT IBRD / 84060 Post Consultant Open 101,503.76 0.00 Canceled 2019-05-04 Approaches 22 13 17 11 Authority (ENICTA) Transition Selection Team- JM-MOFPS-113520-CS-INDV / Business Impact Lead Individual Adaptive Public Sector 2019-06- 2019-07- 2019-08- 2020-08- Establishment of the new ICT IBRD / 84060 Post Consultant Open 88,308.27 0.00 Canceled 2019-05-04 Approaches 22 13 17 11 Authority (ENICTA) Transition Selection Team JM-MOFPS-113521-CS-INDV / Information, Individual Communication and Adaptive Public Sector 2019-06- 2019-07- 2019-08- 2020-08- IBRD / 84060 Post Consultant Open 86,278.20 0.00 Canceled 2019-05-04 Technology Lead Approaches 22 13 17 11 Selection Establishment of the new ICT Authority (ENICTA) Transition Team JM-MOFPS-113523-CS-INDV / Communication and Change Individual Adaptive Public Sector 2019-06- 2019-07- 2019-08- 2020-08- Lead- Establishment of the IBRD / 84060 Post Consultant Open 89,665.38 0.00 Canceled 2019-05-04 Approaches 22 13 17 11 New ICT Authority (ENICTA) Selection Transition team JM-MOFPS-113537-CS-INDV Individual Adaptive Public Sector 2019-06- 2019-07- 2019-08- 2020-08- / Executive Programme Lead IBRD / 84060 Post Consultant Open 121,804.51 0.00 Canceled 2019-05-04 Approaches 22 13 17 11 (ENICTA) Selection Individual JM-MOFPS-113543-CS-INDV Adaptive Public Sector 2019-09- 2019-10- 2019-11- 2020-11- IBRD / 84060 Post Consultant Open 26,000.00 0.00 Canceled 2019-08-04 / Project Administrator, eGov Approaches 22 13 17 11 Selection JM-MOFPS-113548-CS-CDS / Consultant to proof read Individual Adaptive Public Sector 2018-12- 2019-06- 2019-03- 2019-07- 2019-03- 2019-08- 2019-03- 2020-02- 2019-09- Legal Handbook for IBRD / 84060 Post Consultant Direct 220.81 198.41 Completed 2019-06-10 Approaches 21 20 26 11 26 15 26 11 19 Centralization of Legal Selection Services. JM-MOFPS-114184-CS-INDV Strengthening Public Individual 2019-05- 2019-06- 2019-07- 2019-08- 2020-08- / Project development IBRD / 84060 Investment Management Post Consultant Open 85,000.00 0.00 Canceled 2019-05-08 28 26 17 21 15 specialist, Sports Museum System (PIMS) Selection JM-MOFPS-114178-CS-CDS / System Administrator - 1st Strengthening Budget Individual 2018-12- 2019-08- 2018-11- 2019-09- 2018-11- 2019-10- 2018-12- 2021-10- Consultant (Component 2) - IBRD / 84060 Preparation Process and Post Consultant Direct 56,172.87 49,247.26 Signed 2019-08-02 04 12 21 02 26 07 04 26 (NB: Requires two (2) Result Based Budgeting Selection Consultants) JM-MOFPS-114183-CS-INDV / Technical Specialist Strengthening Public Individual Under 2019-11- 2019-06- 2019-07- 2019-08- 2020-02- Consultant for Usain Bolt UWI IBRD / 84060 Investment Management Post Consultant Open 30,600.00 0.00 2019-05-08 Implementation 28 26 17 21 17 Sport and Exercise Medicine System (PIMS) Selection Center Strengthening Public Individual JM-MOFPS-113510-CS-INDV Under 2019-06- 2019-08- 2019-09- 2019-10- 2020-10- IBRD / 84060 Investment Management Post Consultant Open 67,440.00 0.00 2019-06-24 / Adjudicator - PIMIS Implementation 13 12 02 07 01 System (PIMS) Selection JM-MOFPS-83651-CS-INDV Individual Adaptive Public Sector 2019-09- 2019-05- 2019-06- 2019-07- 2020-01- / Project Manager for IBRD / 84060 Post Consultant Open 66,176.47 0.00 Canceled 2019-04-08 Approaches 02 27 17 22 18 Companies Office of Jamaica. Selection JM-MOFPS-113412-CS-INDV Individual / Project Administrator - Adaptive Public Sector 2019-06- 2019-07- 2019-08- 2020-02- IBRD / 84060 Post Consultant Open 37,314.00 0.00 Canceled 2019-05-03 Transformation of the Approaches 21 12 16 12 Selection Companies Office of Jamaica JM-MOFPS-125025-CS-INDV Individual / Human Resource Lead for Adaptive Public Sector 2019-09- 2019-10- 2019-11- 2020-11- IBRD / 84060 Post Consultant Open 74,909.77 0.00 Canceled 2019-07-26 the Establishment of the new Approaches 13 04 08 02 Selection ICT Authority (ENICTA) JM-MOFPS-125439-CS-INDV Individual / System/Application Tester Adaptive Public Sector 2019-09- 2019-09- 2019-10- 2019-11- 2020-11- IBRD / 84060 Post Consultant Open 54,100.00 0.00 Canceled 2019-07-29 for the Centralization of Legal Approaches 02 16 07 11 05 Selection Services JM-MOFPS-126099-CS-INDV / Human Resource Generalist Individual Adaptive Public Sector 2019-04- 2019-09- 2019-11- 2019-10- 2019-12- 2019-11- 2019-12- 2020-11- for the Public Sector IBRD / 84060 Post Consultant Open 43,614.82 80,932.94 Signed 2019-08-02 Approaches 14 20 04 11 01 15 09 09 Transformation Selection Implementation Unit (PSTIU) JM-MOFPS-126100-CS-INDV / System Administration - Strengthening Public Individual 2018-12- 2019-08- 2018-11- 2019-09- 2018-11- 2019-10- 2018-12- 2021-10- 2nd Consultant (Component IBRD / 84060 Investment Management Post Consultant Direct 51,851.86 45,458.98 Signed 2019-08-02 04 12 21 02 26 07 04 26 2) (NB: Requires two (2) System (PIMS) Selection Consultants) JM-MOFPS-130259-CS-INDV / Financial Management Strengthening Public Individual Specialist -Jamaica Integrated 2020-05- 2019-12- 2020-01- 2020-02- 2021-02- IBRD / 84060 Investment Management Post Consultant Open 55,368.00 0.00 Canceled 2019-11-05 Financial Management 03 24 14 18 17 System (PIMS) Selection Information System (JIFMIS) (3rd Consultant) JM-MOFPS-130266-CS-INDV / Financial Management Strengthening Public Individual Specialist - Jamaica 2020-05- 2019-12- 2020-01- 2020-02- 2021-02- IBRD / 84060 Investment Management Post Consultant Open 55,368.00 0.00 Canceled 2019-11-05 Integrated Financial 03 24 14 18 17 System (PIMS) Selection Management Information System (JIFMIS) (1st Consultant) Page 11 JM-MOFPS-130269-CS-INDV / Financial Management Strengthening Public Individual 2020-05- 2019-12- 2020-01- 2020-02- 2021-02- Specialist - Jamaica IBRD / 84060 Investment Management Post Consultant Open 55,368.00 0.00 Canceled 2019-11-05 03 24 14 18 17 Integrated Financial System (PIMS) Selection Management System (JIFMIS) (2nd Consultant) JM-MOFPS-130271-CS-INDV / Database Administrator - Strengthening Public Individual 2019-12- 2020-01- 2020-02- 2021-02- Jamaica Integrated Financial IBRD / 84060 Investment Management Post Consultant Open 62,222.22 0.00 Canceled 2019-11-05 24 14 18 17 Management System (JIFMIS) System (PIMS) Selection (1st Consultant) JM-MOFPS-130273-CS-INDV / Financial Management Strengthening Public Individual 2020-01- 2019-11- 2019-12- 2020-01- 2021-01- Advisor - Jamaica Integrated IBRD / 84060 Investment Management Post Consultant Open 73,824.00 0.00 Canceled 2019-09-22 15 10 01 05 04 Financial Management System System (PIMS) Selection (JIFMIS) JM-MOFPS-130274-CS-INDV Strengthening Public Individual / Business Analyst - Jamaica 2020-05- 2019-12- 2020-01- 2020-02- 2021-02- IBRD / 84060 Investment Management Post Consultant Open 53,317.33 0.00 Canceled 2019-11-04 Integrated Financial 03 12 02 06 05 System (PIMS) Selection Management System (JIFMIS) JM-MOFPS-130278-CS-INDV Strengthening Public Individual / System Administrator - 2019-12- 2020-01- 2020-02- 2021-02- IBRD / 84060 Investment Management Post Consultant Open 60,289.60 0.00 Canceled 2019-11-05 Jamaica Integrated Financial 24 14 18 17 System (PIMS) Selection Management System (JIFMIS) JM-MOFPS-130280-CS-INDV / Accountants - Jamaica Strengthening Public Individual 2019-12- 2020-01- 2020-02- 2021-02- Integrated Financial IBRD / 84060 Investment Management Post Consultant Open 20,222.22 0.00 Canceled 2019-11-05 24 14 18 17 Management System (JIFMIS) System (PIMS) Selection (5th Consultant) JM-MOFPS-130282-CS-INDV / Accountants - Jamaica Strengthening Public Individual 2019-12- 2020-01- 2020-02- 2021-02- Integrated Financial IBRD / 84060 Investment Management Post Consultant Open 20,222.22 0.00 Canceled 2019-11-05 24 14 18 17 Management System (JIFMIS) System (PIMS) Selection (4th Consultant) JM-MOFPS-130283-CS-INDV / Accountants - Jamaica Strengthening Public Individual 2019-12- 2020-01- 2020-02- 2021-02- Integrated Financial IBRD / 84060 Investment Management Post Consultant Open 20,222.22 0.00 Canceled 2019-11-05 24 14 18 17 Management System (JIFMIS) System (PIMS) Selection (3rd Consultant) JM-MOFPS-130285-CS-INDV / Accountants - Jamaica Strengthening Public Individual 2019-11- 2019-12- 2020-01- 2021-01- Integrated Financial IBRD / 84060 Investment Management Post Consultant Open 20,222.22 0.00 Canceled 2019-09-22 10 01 05 04 Management System (JIFMIS) System (PIMS) Selection (2nd Consultant) JM-MOFPS-130286-CS-INDV / Accountants - Jamaica Strengthening Public Individual 2019-12- 2020-01- 2020-02- 2021-02- Integrated Financial IBRD / 84060 Investment Management Post Consultant Open 20,222.22 0.00 Canceled 2019-11-04 23 13 17 16 Management System (JIFMIS) System (PIMS) Selection (1st consultant) JM-MOFPS-130289-CS-INDV / Database Administrator - Strengthening Public Individual 2019-12- 2020-01- 2020-02- 2021-02- Jamaica Integrated Financial IBRD / 84060 Investment Management Post Consultant Open 62,222.22 0.00 Canceled 2019-11-05 24 14 18 17 Management System (JIFMIS) System (PIMS) Selection (2nd Consultant) JM-MOFPS-113392-CS-INDV Strengthening Public Individual / Consultant to develop a 2019-11- 2019-06- 2019-07- 2019-08- 2020-08- IBRD / 84060 Investment Management Post Consultant Open 58,395.00 0.00 Canceled 2019-05-03 Comprehensive and Concise 28 21 12 16 10 System (PIMS) Selection Policy Paper for the PIMS. JM-MOFPS-121404-CS-INDV / Partner Liaison, Institutional Development (PSTIU) - to provide internal and external Individual consultations, project Adaptive Public Sector 2019-08- 2019-09- 2019-10- 2021-09- IBRD / 84060 Post Consultant Open 44,812.00 0.00 Canceled 2019-06-27 coordination liaisons, partner Approaches 15 05 10 29 Selection sensitization, representation in networks at various forums to facilitate capacity building and knowledge transfer JM-MOFPS-124815-CS-INDV / Research Assistant Consultant for PIMSEC - will facilitate evidence based Strengthening Public Individual decision making through the 2019-07- 2019-09- 2020-01- 2019-10- 2020-02- 2019-11- 2020-02- 2020-11- IBRD / 84060 Investment Management Post Consultant Open 26,000.00 24,405.29 Signed 2019-07-25 collection, 24 12 20 03 17 07 17 01 System (PIMS) Selection collating, analysis and reporting on statistical data related to proposals for public investments. JM-MOFPS-138896-CS-INDV / Consultant Information Individual Communication and Adaptive Public Sector 2019-10- 2019-12- 2020-03- 2020-01- 2020-05- 2020-02- 2020-06- 2021-02- IBRD / 84060 Post Consultant Open 69,000.00 132,374.08 Signed 2019-11-05 Technology Lead for the Approaches 04 24 20 14 19 18 01 17 Selection Transformation Implementation Unit JM-MOFPS-138897-CS-INDV Individual / Consultant Facilities Lead Adaptive Public Sector 2019-11- 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-04- 2021-02- IBRD / 84060 Post Consultant Open 90,000.00 37,414.96 Signed 2019-11-05 for the Transformation Approaches 01 24 29 14 24 18 20 17 Selection Implementation Unit JM-MOFPS-138898-CS-INDV Individual / Business Analyst for Adaptive Public Sector 2017-12- 2019-12- 2018-11- 2020-01- 2018-12- 2020-02- 2020-01- 2021-02- IBRD / 84060 Post Consultant Open 68,000.00 109,805.73 Signed 2019-11-05 Transformation Approaches 18 24 15 14 10 18 21 17 Selection Implementation Unit JM-MOFPS-138899-CS-INDV / Operational Change Lead Individual Adaptive Public Sector 2019-09- 2019-12- 2020-01- 2020-02- 2021-02- Consultant for the IBRD / 84060 Post Consultant Open 57,000.00 0.00 Canceled 2019-11-05 Approaches 02 24 14 18 17 Transformation Selection Implementation Unit JM-MOFPS-139214-CS-INDV / Consultancy to prepare a Strengthening Public Individual 2019-11- 2019-11- 2019-12- 2020-01- 2020-03- Project Proposal for the IBRD / 84060 Investment Management Post Consultant Open 57,000.00 0.00 Canceled 2019-10-08 28 26 17 21 31 Holland Agro-Economic Zone System (PIMS) Selection Agricultural Project JM-MOFPS-140888-CS-INDV Individual / Information Technology Adaptive Public Sector 2019-06- 2019-10- 2019-07- 2019-11- 2019-09- 2019-12- 2020-02- 2020-06- IBRD / 84060 Post Consultant Limited 29,000.00 24,764.40 Signed 2019-10-20 Administration for Approaches 28 25 10 15 05 20 20 17 Selection Centralization of Legal Service JM-MOFPS-113409-CS-INDV Individual Adaptive Public Sector 2019-06- 2019-07- 2019-08- 2020-08- / Project Administrator - IBRD / 84060 Post Consultant Open 54,000.00 0.00 Canceled 2019-05-03 Approaches 21 12 16 10 eGov Selection JM-MOFPS-83488-CS-INDV Strengthening Public Individual 2019-01- 2019-02- 2019-03- 2019-09- / Gallery Designer Jamaica IBRD / 84060 Investment Management Post Consultant Open 12,300.00 0.00 Canceled 2018-11-23 11 01 08 04 Music Museum (PIEF) System (PIMS) Selection JM-MOFPS-142904-CS-INDV Individual Fostering Industrial Growth 2019-11- 2019-11- 2020-01- 2020-07- / Mediator for BSJ/NCRA (1st IBRD / 84060 Post Consultant Limited 8,212.00 0.00 Canceled 2019-11-03 and Trade Facilitation 08 29 03 01 Consultant) Selection JM-MOFPS-142905-CS-INDV Individual Fostering Industrial Growth 2019-11- 2019-11- 2020-01- 2020-07- / Mediator for BSJ/NCRA (2nd IBRD / 84060 Post Consultant Limited 8,212.00 0.00 Canceled 2019-11-03 and Trade Facilitation 08 29 03 01 Consultant) Selection Page 12 JM-MOFPS-142906-CS-INDV / Consultancy Service for Individual Adaptive Public Sector 2019-12- 2020-01- 2020-02- 2021-12- Legal Advisor to Support the IBRD / 84060 Post Consultant Open 191,740.00 0.00 Canceled 2019-11-06 Approaches 25 15 19 30 Rationalization of Public Selection Bodies JM-MOFPS-143343-CS-INDV / PSLF Project Manager to Individual undertake the effective and Adaptive Public Sector 2019-09- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-03- 2021-02- IBRD / 84060 Post Consultant Open 90,579.71 82,414.80 Signed 2019-11-03 timely implementation of the Approaches 09 22 06 12 07 16 16 15 Selection Public Sector Learning Framework JM-MOFPS-143349-CS-INDV / System Administrator - Strengthening Public Individual 2019-12- 2020-01- 2020-02- 2021-02- Jamaica Integrated Financial IBRD / 84060 Investment Management Post Consultant Open 60,289.60 0.00 Canceled 2019-11-05 24 14 18 17 Management System (2nd System (PIMS) Selection Consultant) JM-MOFPS-143352-CS-INDV / Management Analyst - PSTIU (1st Consultant) - provide analytical management assistance by Individual Adaptive Public Sector 2019-08- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-03- 2020-03- planning, coordinating and IBRD / 84060 Post Consultant Open 69,565.22 97,222.16 Signed 2019-11-05 Approaches 18 24 11 14 08 18 10 25 directing the management Selection impact or relevant decisions, conducting surveys and studies and recommending specific management action JM-MOFPS-143368-CS-INDV / Management Analyst - PSTIU (3rd Consultant) - provide analytical management assistance by Individual Adaptive Public Sector 2016-12- 2019-12- 2016-12- 2020-01- 2017-02- 2020-02- 2018-05- 2021-02- planning, coordinating and IBRD / 84060 Post Consultant Open 69,565.22 185,369.58 Signed 2019-11-05 Approaches 30 24 08 14 01 18 21 17 directing the management Selection impact or relevant decisions, conducting surveys and studies and recommending specific management action JM-MOFPS-56527-CS-INDV Individual Fostering Industrial Growth 2018-04- 2018-05- 2018-06- 2018-12- / Consultant to develop ICT IBRD / 84060 Post Consultant Limited 23,703.70 0.00 Canceled 2018-04-10 and Trade Facilitation 15 06 10 07 Strategy Selection JM-MOFPS-113384-CS-CDS / Certification of the Jamaica National Agency for Accreditation (JANAAC) by the Fostering Industrial Growth Under 2020-01- 2020-01- 2020-03- 2020-09- IBRD / 84060 Post Direct Selection Direct 63,300.00 0.00 2020-01-13 Food and Drug and Trade Facilitation Implementation 09 23 28 24 Administration (FDA) to provide accreditation services for food testing laboratories JM-MOFPS-151085-CS-INDV Individual Adaptive Public Sector 2020-02- 2020-02- 2020-03- 2020-04- 2021-04- / HR Transition Technical IBRD / 84060 Post Consultant Open 57,777.77 0.00 Canceled 2020-01-05 Approaches 11 23 15 19 19 Officer for the MOFPS Selection JM-MOFPS-151087-CS-INDV / Consultant Technical Strengthening Public Individual 2020-02- 2020-03- 2020-04- 2021-04- Assistant for the Public IBRD / 84060 Investment Management Post Consultant Open 29,376.00 0.00 Canceled 2019-12-29 16 08 12 12 Investment Management System (PIMS) Selection Secretariat (PIMSEC) JM-MOFPS-151695-CS-CDS / Consultancy Service for Training of MDAs in Fostering Industrial Growth Under 2021-06- 2020-01- 2020-04- 2020-03- 2020-04- IBRD / 84060 Post Direct Selection Direct 25,000.00 0.00 2020-01-12 preparation and and Trade Facilitation Implementation 09 22 21 27 26 administration of Technical Regulations JM-MOFPS-151697-CS-CDS / Technical Adviser for the Fostering Industrial Growth 2019-01- 2020-01- 2020-01- 2020-03- 2020-09- 2021-03- IBRD / 84060 Post Direct Selection Direct 65,000.00 64,000.00 Signed 2020-01-12 Upgrade of the Environmental and Trade Facilitation 03 22 08 27 21 27 Control Systems JM-MOFPS-113388-CS-CDS / Component Coordinator: Strengthening Budget Individual 2019-02- 2019-08- 2019-02- 2019-09- 2019-03- 2019-10- 2019-03- 2020-09- 2020-03- Implementation of a Medium- IBRD / 84060 Preparation Process and Post Consultant Direct 176,750.00 176,750.00 Completed 2019-08-02 15 12 26 02 03 07 03 06 30 Term Results Based Approach Result Based Budgeting Selection to Budgeting in Jamaica JM-MOFPS-143365-CS-INDV / Management Analyst - PSTIU (2nd Consultant) - provide analytical management assistance by Individual Adaptive Public Sector 2019-08- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-04- 2021-02- planning, coordinating and IBRD / 84060 Post Consultant Open 69,565.22 48,611.08 Signed 2019-11-05 Approaches 25 24 11 14 29 18 01 17 directing the management Selection impact or relevant decisions, conducting surveys and studies and recommending specific management action JM-MOFPS-163368-CS-INDV Strengthening Public Individual / Senior Project Manager for 2020-03- 2020-04- 2020-05- 2020-06- 2021-06- IBRD / 84060 Investment Management Post Consultant Open 89,705.88 0.00 Canceled 2020-03-09 Enterprise Risk Management 19 27 18 22 22 System (PIMS) Selection Project JM-MOFPS-163375-CS-INDV / Procurement of Solution Individual Architects for implementation Adaptive Public Sector 2020-04- 2020-05- 2020-06- 2021-06- IBRD / 84060 Post Consultant Open 78,094.00 0.00 Canceled 2020-03-09 of Electronic Content Approaches 27 18 22 22 Selection Management for Government of Jamaica JM-MOFPS-163379-CS-INDV / Procurement of Solution Individual Architect for implementation Adaptive Public Sector 2020-04- 2020-05- 2020-06- 2021-06- IBRD / 84060 Post Consultant Open 78,094.00 0.00 Canceled 2020-03-09 of Electronic Content Approaches 27 18 22 22 Selection Management for Government of Jamaica JM-MOFPS-163383-CS-INDV Strengthening Budget Individual 2015-12- 2020-04- 2019-04- 2020-05- 2019-07- 2020-06- 2019-08- 2021-06- / Organizational IBRD / 84060 Preparation Process and Post Consultant Open 66,176.00 9,331.14 Signed 2020-03-09 30 27 30 18 15 22 02 22 Development Specialist Result Based Budgeting Selection JM-MOFPS-113405-CS-INDV / Consultancy for the development of system Adaptive Public Sector 2019-08- 2019-10- 2020-04- requirements specification in IBRD / 84060 Post Direct Selection Direct 62,000.00 0.00 Canceled 2019-07-26 Approaches 05 09 06 line with the government of Jamaica's (GoJ) asset policy and procedures. Strengthening Public Individual JM-MOFPS-164555-CS-INDV 2019-11- 2020-03- 2019-12- 2020-04- 2020-02- 2020-05- 2020-04- 2021-05- IBRD / 84060 Investment Management Post Consultant Limited 75,000.00 34,646.45 Signed 2020-03-15 / M & E Analyst 10 20 17 10 05 15 06 15 System (PIMS) Selection JM-MOFPS-167416-CS-INDV / Financial Management Individual Adaptive Public Sector 2020-05- 2020-05- 2020-06- 2020-07- 2021-07- Advisor for the Jamaica IBRD / 84060 Post Consultant Open 204,000.00 0.00 Canceled 2020-04-12 Approaches 10 31 21 26 26 Integrated Financial Selection Management System (JIFMIS) JM-MOFPS-175420-CS-INDV / M & E Consultant to Strengthening Public Individual 2020-07- 2020-08- 2020-09- 2021-03- Undertake Impact Evaluation IBRD / 84060 Investment Management Post Consultant Open 63,000.00 0.00 Canceled 2020-06-01 20 10 14 13 of Jamaica's Agricultural System (PIMS) Selection Competitiveness Programme Page 13 JM-MOFPS-113391-CS-INDV / Consultant for Increasing Competence of the National Individual Fostering Industrial Growth 2018-05- 2021-02- 2021-03- 2021-04- 2021-11- Certification Body of Jamaica's IBRD / 84060 Post Consultant Open 24,600.00 0.00 Canceled 2021-01-10 and Trade Facilitation 20 28 21 25 21 (NCBJ's) Food Safety Selection personnel towards gaining ISO 22000 Accreditation JM-MOFPS-185491-CS-INDV / Consultant to clear backlogs Individual Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- of Annual Statutory Financial IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Approaches 22 10 01 05 03 Statements in Municipal Selection Corporations - 1st Consultant JM-MOFPS-185492-CS-INDV / Consultant to clear backlogs Individual of Annual Statutory Financial Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Statements in Municipal Approaches 22 10 01 05 03 Selection Corporations - 2nd Consultant JM-MOFPS-185493-CS-INDV / Consultant to clear backlogs Individual Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- of Annual Statutory Financial IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Approaches 22 10 01 05 03 Statements in Municipal Selection Corporations - 3rd Consultant JM-MOFPS-185494-CS-INDV / Consultant to clear backlogs Individual Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- of Annual Statutory Financial IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Approaches 22 10 01 05 03 Statements in Municipal Selection Corporations - 4th Consultant JM-MOFPS-185495-CS-INDV / Consultant to clear backlogs Individual Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- of Annual Statutory Financial IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Approaches 22 10 01 05 03 Statements in Municipal Selection Corporations - 5th Consultant JM-MOFPS-185496-CS-INDV / Consultant to clear backlogs Individual Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- of Annual Statutory Financial IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Approaches 22 10 01 05 03 Statements in Municipal Selection Corporations - 6th Consultant JM-MOFPS-185498-CS-INDV / Consultant to clear backlogs Individual Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- of Annual Statutory Financial IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Approaches 22 10 01 05 03 Statements in Municipal Selection Corporations - 7th Consultant JM-MOFPS-185499-CS-INDV / Consultant to clear backlogs Individual Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- of Annual Statutory Financial IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Approaches 22 10 01 05 03 Statements in Municipal Selection Corporations - 8th Consultant JM-MOFPS-185500-CS-INDV / Consultant to clear backlogs Individual Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- of Annual Statutory Financial IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Approaches 22 10 01 05 03 Statements in Municipal Selection Corporations - 9th Consultant JM-MOFPS-185501-CS-INDV / Consultant to clear backlogs Individual of Annual Statutory Financial Adaptive Public Sector 2020-07- 2020-09- 2020-10- 2020-11- 2021-02- IBRD / 84060 Post Consultant Open 10,500.00 0.00 Canceled 2020-07-23 Statements in Municipal Approaches 22 10 01 05 03 Selection Corporations - 10th Consultant JM-MOFPS-35459-CS-INDV Strengthening Public Individual / Consultant for Governance 2021-01- 2021-01- 2021-02- 2021-03- 2022-03- IBRD / 84060 Investment Management Post Consultant Limited 98,250.86 0.00 Canceled 2021-01-07 /regulatory matters regarding 11 12 02 09 09 System (PIMS) Selection PIMS JM-MOFPS-35455-CS-INDV Strengthening Public Individual 2020-07- 2017-11- 2017-12- 2018-01- 2018-07- / Consultant to support PSIP IBRD / 84060 Investment Management Post Consultant Limited 24,538.46 0.00 Canceled 2017-11-06 03 11 02 06 05 Policy paper System (PIMS) Selection Strengthening Public Individual JM-MOFPS-55200-CS-INDV 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- 2018-05- 2018-08- IBRD / 84060 Investment Management Post Consultant Limited 5,700.00 0.00 Canceled 2018-03-21 / Database Consultant 02 26 10 16 27 21 19 System (PIMS) Selection Strengthening Public Individual JM-MOFPS-55206-CS-INDV 2019-04- 2018-03- 2019-05- 2018-04- 2019-07- 2018-05- 2018-08- IBRD / 84060 Investment Management Post Consultant Limited 5,700.00 0.00 Canceled 2018-03-21 / Database Consultant 17 26 31 16 01 21 19 System (PIMS) Selection JM-MOFPS-142901-CS-INDV Strengthening Public Individual 2018-12- 2019-12- 2019-10- 2020-01- 2019-10- 2020-02- 2020-08- / Gallery Designer for Jamaica IBRD / 84060 Investment Management Post Consultant Open 80,000.00 0.00 Canceled 2019-10-25 03 13 04 03 04 07 05 Music Museum (PIEF) System (PIMS) Selection JM-MOFPS-142902-CS-INDV Strengthening Public Individual / 3D Designer Multimedia 2018-12- 2019-12- 2019-10- 2020-01- 2019-10- 2020-02- 2020-08- IBRD / 84060 Investment Management Post Consultant Open 16,000.00 0.00 Canceled 2019-10-25 Content Specialist for Jamaica 03 13 04 03 04 07 05 System (PIMS) Selection Music Museum JM-MOFPS-113408-CS-INDV Individual / Partner Liaison Officer, Adaptive Public Sector 2018-05- 2019-06- 2019-02- 2019-07- 2019-04- 2019-08- 2020-08- IBRD / 84060 Post Consultant Open 120,000.00 0.00 Canceled 2019-05-03 Institutional Development Approaches 02 21 05 12 20 16 10 Selection and Strategic Development JM-MOFPS-62288-CS-INDV Individual Adaptive Public Sector 2018-02- 2018-07- 2019-02- 2018-07- 2019-05- 2018-08- 2019-02- / Partner Liaison, Institutional IBRD / 84060 Post Consultant Open 60,000.00 0.00 Canceled 2018-05-14 Approaches 01 02 05 23 31 27 23 Development Selection Individual JM-MOFPS-113545-CS-INDV Adaptive Public Sector 2016-07- 2019-06- 2016-11- 2019-07- 2016-11- 2019-08- 2020-08- IBRD / 84060 Post Consultant Open 87,220.15 0.00 Canceled 2019-05-04 / PSLF Project Officer (MIND) Approaches 04 22 10 13 07 17 11 Selection Page 14 Anexo 1 PLAN DE ADQUISICIONES Información del proyecto: República de Guatemala, Proyecto CRECER SANO: Salud y Nutrición (P159213) Agencia implementadora del Proyecto: Ministerio de Salud Pública y Asistencia Social -MSPAS- Fecha del Plan de adquisiciones: 9 de octubre de 2019 Período cubierto por este Plan de Adquisiciones: 2019-2023 Preámbulo De conformidad con el párrafo 5.9 de las "Regulaciones de Adquisición del Banco Mundial para prestatarios IPF" (julio de 2016, revisadas noviembre 2017 y agosto 2018) ("Regulaciones de Adquisiciones") el Sistema de seguimiento en Adquisiciones (STEP) será utilizado para preparar, aclarar y actualizar los Planes de Adquisiciones y realizar todas las transacciones de adquisiciones para el Proyecto. Esta parte del texto, junto con las tablas del Plan de Adquisiciones en STEP constituyen el Plan de Adquisiciones para el Proyecto. Las siguientes condiciones aplican a todas las actividades de adquisición en el Plan de Adquisiciones. Los otros elementos del Plan de Adquisiciones como se exigen en el apartado 4.4 de las Regulaciones de Adquisiciones se exponen en el STEP. Documentos Estándar de Adquisiciones del Banco: Se utilizarán los documentos estándar para los contratos sujetos a competencia internacional y los contratos sujetos a revisión previa especificados en las tablas Plan de Adquisiciones de STEP. Disposiciones Nacionales de Adquisición: De conformidad con el párrafo 5.3 de las Regulaciones de Adquisiciones, cuando el enfoque es el mercado nacional (como se especifica en las tablas del Plan de Adquisiciones de STEP), se utilizarán documentos acordados con el Banco Mundial los cuales forman parte del Manual de Operaciones del Proyecto y se aplicarán las Regulaciones de Adquisiciones del Banco Mundial y no la Ley de Contrataciones del Estado. Lo anterior se aplicará para las adquisiciones siguientes de acuerdo a la Estrategia de Adquisiciones del Proyecto: - Remozamiento de puestos de salud - Construcción de puestos de salud - Obras de suministro de agua potable - Construcción de letrinas - Servicios de logística (Talleres) comunitarios MSPAS - Servicios de logística (Taller) para fortalecimiento de salas situacionales para técnicos de SESAN año 2019 - Servicios de logística (Talleres) para fortalecimiento de Gobernanza SESAN año 2020 - Servicios de logística (Talleres) para la conformación de direcciones municipales de seguridad alimentaria SESAN año 2020 - Servicios de logística (Talleres) para monitoreo y análisis de información SESAN año 2020 - Servicios de logística (Talleres) para implementación de la Estrategia de comunicación institucional SESAN - Impresión de Material educativo de apoyo fortalecimiento de las comisiones departamentales y municipales de seguridad alimentaria y nutricional SESAN - Reproducción de Materiales MSPAS - Consultoría para diseño y montaje de curso en línea de gestión para la prevención de la desnutrición crónica, orientado a funcionarios públicos SESAN - Equipo Antropométrico, cadena de frío, esfigmomanómetros y estetoscopios - Mobiliario y equipo para puestos de salud o unidades mínimas existentes MSPAS - Insumos para oficina (papelería y útiles, tóner, tintas de impresoras, lápices, lapiceros, folder, bolsa manila, tape, goma, grapas, engrapadoras, leitz, rotuladores, cuadernos) - Mobiliario de oficina SESAN (salas virtuales) (7 mesas de reuniones para 10 sillas con rodos US$1200 por juego) - Auditoría Externa 2019-2023 - Kits de Trabajo para monitores de campo cambio de comportamiento SESAN - Estudio socio cultural de programa de transferencias MIDES - Equipo de cómputo para MSPAS, MIDES y SESAN - Adquisición de Motocicletas y vehículos - Adquisición de cupones de Combustible y lubricantes - Alquiler de Multifuncionales (fotocopiadora, escáner e impresora) Para las adquisiciones con enfoque al mercado nacional, los documentos acordados con el Banco son: 1. Declaración de Confidencialidad 2. Solicitud de Expresiones de Interés 3. Evaluación de Expresiones de Interés para Lista Corta 4. Solicitud de Hojas de Vida Consultor Individual 5. Informe de evaluación de Consultores Individuales 6. Modelo de Contrato de Consultor Individual 7. Documento de Solicitud de Cotizaciones (SdC) - Bienes 8. Informe de Evaluación de ofertas para SdC - Bienes 9. Documento de Solicitud de Cotizaciones (SdC) – Servicios de no consultoría 10. Informe de Evaluación de ofertas para SdC - Servicios de no consultoría 11. Documento de Solicitud de Ofertas (SdO) (Nacional) - Obras 12. Informe de evaluación SdO – Obras 13. Documento de Solicitud de Ofertas (SdO) (Nacional) - Bienes 14. Informe de evaluación SdO – Bienes Todos los documentos antes mencionados incluirán las cláusulas de Fraude y Corrupción vigentes al momento de lanzar los procesos. Dichas cláusulas estándar también serán incorporadas en todos los contratos y las órdenes de compras. PROCUREMENT Guatemala : Crecer Sano: Guatemala Nutrition and Health Project PLAN General Information Country: Guatemala Bank’s Approval Date of the Original Procurement Plan: 2019-10-09 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159213 GPN Date: 2020-07-25 Project Name: Crecer Sano: Guatemala Nutrition and Health Project Loan / Credit No: IBRD / 87300 M Executing Agency(ies): inistry of Public Health and Social Assistance WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GT-MSPAS-118753-CW-RFB / Remozamiento de 40 Providing Inter-sectoral Pending Single Stage - One 2021-01- puestos de salud (proceso por IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 2,446,062.34 0.00 Implementat 2020-04-01 2020-04-06 2020-05-18 2020-06-17 2020-07-22 Envelope 18 lotes) US$50,000 cada puesto Malnutrition Risk Factors ion de salud GT-MSPAS-118864-CW-RFB / Construcción de 90 Puestos Providing Inter-sectoral Pending Single Stage - One 16,502,539.8 2021-09- de salud (proceso por lotes) IBRD / 87300 Services to Address Chronic Prior Request for Bids Open - National 0.00 Implementat 2020-12-01 2020-12-06 2021-01-17 2021-02-16 2021-03-23 Envelope 0 19 US$168,998 cada puesto de Malnutrition Risk Factors ion salud GT-MSPAS-118865-CW-RFB / Construcción de 130 Providing Inter-sectoral Pending proyectos de suministro de Single Stage - One 12,706,444.8 2023-10- IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 0.00 Implementat 2023-01-02 2023-01-07 2023-02-18 2023-03-20 2023-04-24 agua potable (proceso por Envelope 1 21 Malnutrition Risk Factors ion lotes) US$78,000 cada proyecto de agua GT-MSPAS-118868-CW-RFB Providing Inter-sectoral Pending / Construcción de 4,550 Single Stage - One 2023-10- IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 5,765,030.56 0.00 Implementat 2023-01-02 2023-01-07 2023-02-18 2023-03-20 2023-04-24 letrinas (proceso por lotes) Envelope 21 Malnutrition Risk Factors ion US$1,230 cada letrina GT-MSPAS-213905-CW-RFB Providing Inter-sectoral Under Single Stage - One 2021-11- / Remozamiento de 18 IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 1,100,728.00 0.00 Implementat 2021-02-15 2021-04-29 2021-02-20 2021-03-22 2021-04-11 2021-05-21 Envelope 17 puestos de Salud (Grupo 1) Malnutrition Risk Factors ion GT-MSPAS-213906-CW-RFB Support the Borrower’s Pending / Construcción de Módulos Single Stage - One 2021-11- IBRD / 87300 response to the COVID-19 Post Request for Bids Open - National 3,000,000.00 0.00 Implementat 2021-02-26 2021-03-03 2021-04-02 2021-04-22 2021-06-01 prefabricados Anexo Hospital Envelope 28 pandemic ion Nacional de San Marcos National GT-MSPAS-237402-CW-RFB Providing Inter-sectoral Procurement Pending Single Stage - One 2022-01- / Remozamiento de 18 IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National Document - 1 1,100,728.00 0.00 Implementat 2021-06-11 2021-06-16 2021-07-16 2021-07-31 2021-09-07 Envelope 13 puestos de salud (Grupo 2) Malnutrition Risk Factors Envelope process ion (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GT-MSPAS-118870-GO-DIR Providing Inter-sectoral Pending / Adquisición de IBRD / 87300 Services to Address Chronic Post Direct Selection Direct 1,900,500.70 0.00 Implementati 2020-02-02 2020-02-07 2020-03-13 2020-09-09 micronutrientes Malnutrition Risk Factors on GT-MSPAS-118885-GO-RFB Providing Inter-sectoral Pending / Adquisición de bienes para Single Stage - One IBRD / 87300 Services to Address Chronic Post Request for Bids Open - International 1,331,763.20 0.00 Implementati 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 2020-12-19 Vigilancia de calidad de Agua Envelope Malnutrition Risk Factors on MSPAS GT-MSPAS-119070-GO-RFQ / Kit de trabajo para Providing Inter-sectoral Pending monitores de campo para Request for Single Stage - One IBRD / 87300 Services to Address Chronic Post Open - National 67,000.00 0.00 Implementati 2020-02-08 2020-04-04 2020-10-01 cambio de comportamiento Quotations Envelope Malnutrition Risk Factors on SESAN (7 departamentos priorizados) GT-MSPAS-119072-GO-RFQ / Mobiliario de oficina SESAN Providing Inter-sectoral Pending Request for Single Stage - One (salas virtuales) (7 mesas de IBRD / 87300 Services to Address Chronic Post Open - National 8,400.00 0.00 Implementati 2020-07-06 2020-08-31 2021-02-27 Quotations Envelope reuniones para 10 sillas con Malnutrition Risk Factors on rodos US$1,200 por juego) GT-MSPAS-119075-GO-RFQ Providing Inter-sectoral Request for Single Stage - One / Adquisición de cupones de IBRD / 87300 Services to Address Chronic Post Open - National 65,000.00 25,665.70 Signed 2019-10-30 2019-12-25 2020-10-05 2020-06-22 Quotations Envelope combustible y lubricantes Malnutrition Risk Factors GT-MSPAS-118934-GO-DIR / Filtros caseros para Providing Inter-sectoral Pending purificación de agua (10,000 IBRD / 87300 Services to Address Chronic Post Direct Selection Direct 649,350.65 0.00 Implementati 2020-07-01 2020-07-06 2020-08-10 2021-02-06 unidad a US$64.93 cada uno) Malnutrition Risk Factors on ecofiltros GT-MSPAS-118876-GO-RFB Providing Inter-sectoral Pending Single Stage - One / Equipo de computo para IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 1,411,850.00 0.00 Implementati 2020-01-31 2020-02-05 2020-03-18 2020-04-17 2020-05-22 2020-11-18 Envelope MSPAS, MIDES y SESAN Malnutrition Risk Factors on GT-MSPAS-119074-GO-RFQ / Insumos para oficina (papelería y útiles, toner, Providing Inter-sectoral Under tintas de impresoras, lápices, Request for Single Stage - One IBRD / 87300 Services to Address Chronic Post Open - National 155,327.79 0.00 Implementati 2020-01-10 2020-03-06 2020-04-20 lapiceros, folder, bolsa Quotations Envelope Malnutrition Risk Factors on manila, tape, goma, grapas, engrapadoras, leitz, rotuladores, cuadernos) Page 1 GT-MSPAS-171079-GO-RFQ / Suministro e instalación de Providing Inter-sectoral Pending Request for Single Stage - One 2 módulos prefabricados que IBRD / 87300 Services to Address Chronic Post Open - National 85,000.00 0.00 Implementati 2020-05-11 2020-06-21 2020-09-19 Quotations Envelope serán utilizados como oficinas Malnutrition Risk Factors on del Proyecto CRECER SANO GT-MSPAS-171082-GO-RFQ Supporting Project Pending / Mobiliario y equipo para Request for Single Stage - One IBRD / 87300 Management, Monitoring and Post Open - National 35,000.00 0.00 Implementati 2020-06-15 2020-07-31 2020-09-14 oficina de la UIP Proyecto Quotations Envelope Evaluation on CRECER SANO GT-MSPAS-118754-GO-RFB / Equipo Antropométrico, cadena de frío, esfigmomanómetros, Providing Inter-sectoral Under estetoscopio, equipo médico Single Stage - One IBRD / 87300 Services to Address Chronic Post Request for Bids Open - International 3,329,949.00 0.00 Implementati 2020-01-02 2021-04-15 2020-01-07 2021-04-15 2020-02-18 2021-06-07 2020-03-19 2020-04-23 2020-10-20 quirúrgico, mobiliario y Envelope Malnutrition Risk Factors on equipo y equipo audiovisual para Puestos Salud oficiales, Centros Comunitarios y Extramuros GT-MSPAS-118886-GO-RFB / Equipo Antropométrico, cadena de frío, Providing Inter-sectoral Pending esfigmomanómetros, Single Stage - One IBRD / 87300 Services to Address Chronic Prior Request for Bids Open - National 4,707,942.00 0.00 Implementati 2020-06-01 2020-06-06 2020-07-18 2020-08-17 2020-09-21 2021-03-20 estetoscopio, equipo médico Envelope Malnutrition Risk Factors on quirúrgico, mobiliario y equipo y equipo audiovisual para Nuevos Puestos Salud GT-MSPAS-118874-GO-RFB / Adquisición de motocicletas, vehículos tipo pick up, pick up Providing Inter-sectoral Pending Single Stage - One con furgón, camionetas tipo IBRD / 87300 Services to Address Chronic Prior Request for Bids Open - International 8,092,000.00 0.00 Implementati 2019-10-25 2019-10-30 2019-12-11 2020-01-10 2020-02-14 2020-08-12 Envelope agrícola y camioneta tipo Malnutrition Risk Factors on microbús para SESAN, MIDES y MSPAS GT-MSPAS-231980-GO-RFB / Adquisición de Kit Educativo Providing Inter-sectoral Under Single Stage - One y Demostrativo en Lactancia IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 56,000.00 0.00 Implementati 2021-04-29 2021-05-18 2021-05-06 2021-06-05 2021-06-17 2021-07-06 2021-10-05 Envelope Materna y Alimentación Malnutrition Risk Factors on complementaria NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GT-MSPAS-118878-NC-RFB / Impresión de material educativo de apoyo fortalecimiento de las Providing Inter-sectoral Pending comisiones departamentales y Single Stage - One IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 25,000.00 0.00 Implementati 2020-01-01 2020-01-06 2020-02-17 2020-03-18 2020-04-22 2020-10-19 municipales de seguridad Envelope Malnutrition Risk Factors on alimentaria y nutricional para talleres año 2020 (impresiones y material audiovisual) SESAN GT-MSPAS-119076-NC-RFB Providing Inter-sectoral Pending Single Stage - One / Reproducción de materiales IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 1,403,409.86 0.00 Implementati 2020-01-02 2020-01-07 2020-02-18 2020-03-19 2020-04-23 2020-10-20 Envelope MSPAS Malnutrition Risk Factors on GT-MSPAS-119080-NC-RFQ / Taller para fortalecimiento Providing Inter-sectoral Pending Request for Single Stage - One de Gobernanza SESAN año IBRD / 87300 Services to Address Chronic Post Open - National 30,000.00 0.00 Implementati 2020-07-06 2020-08-31 2020-10-30 Quotations Envelope 2020 (espacio, hospedaje y Malnutrition Risk Factors on alimentación) GT-MSPAS-119081-NC-RFQ / Taller para la conformación Providing Inter-sectoral Pending de direcciones municipales de Request for Single Stage - One IBRD / 87300 Services to Address Chronic Post Open - National 30,000.00 0.00 Implementati 2020-07-06 2020-08-31 2020-10-30 seguridad alimentaria SESAN Quotations Envelope Malnutrition Risk Factors on año 2020 (espacio, hospedaje y alimentación) GT-MSPAS-119082-NC-RFQ / Taller para monitoreo y Providing Inter-sectoral Pending Request for Single Stage - One análiis de información SESAN IBRD / 87300 Services to Address Chronic Post Open - National 30,000.00 0.00 Implementati 2020-07-06 2020-08-31 2020-10-30 Quotations Envelope año 2020 (espacio, hospedaje Malnutrition Risk Factors on y alimentación) GT-MSPAS-119083-NC-RFQ / Servicios de logística Providing Inter-sectoral Pending Request for Single Stage - One (talleres) de implementación IBRD / 87300 Services to Address Chronic Post Open - National 937,501.17 0.00 Implementati 2020-02-07 2020-04-03 2020-06-02 Quotations Envelope de la Estrategia de Malnutrition Risk Factors on comunicación institucional GT-MSPAS-119077-NC-RFQ Providing Inter-sectoral / Alquiler de multifuncionales Request for Single Stage - One IBRD / 87300 Services to Address Chronic Post Open - National 15,000.00 2,746.75 Signed 2020-01-31 2020-03-27 2020-08-10 2020-09-23 (fotocopiadora, escaner e Quotations Envelope Malnutrition Risk Factors impresora) UIP GT-MSPAS-119079-NC-RFQ / Taller presencial para Providing Inter-sectoral Pending fortalecimiento de salas Request for Single Stage - One IBRD / 87300 Services to Address Chronic Post Open - National 30,000.00 0.00 Implementati 2020-01-31 2020-03-27 2020-05-26 situacionales para técnicos de Quotations Envelope Malnutrition Risk Factors on SESAN año 2019 (espacio, hospedaje y alimentación) GT-MSPAS-119084-NC-RFQ Providing Inter-sectoral Pending Request for Single Stage - One / Servicios de Logística IBRD / 87300 Services to Address Chronic Post Open - National 122,727.27 0.00 Implementati 2020-01-31 2020-03-27 2020-05-26 Quotations Envelope (talleres) comunitarios MSPAS Malnutrition Risk Factors on GT-MSPAS-140904-NC-RFQ / Servicios Logísticos (Talleres Providing Inter-sectoral Pending Request for Single Stage - One para realizar Diagnósticos en IBRD / 87300 Services to Address Chronic Post Open - National 15,000.00 0.00 Implementati 2020-01-28 2020-02-18 2020-03-19 Quotations Envelope los Distritos Municipales) Malnutrition Risk Factors on MSPAS Page 2 GT-MSPAS-138851-NC-RFQ Supporting Project Pending / Servicios de Logística (taller Request for Single Stage - One IBRD / 87300 Management, Monitoring and Post Open - National 5,000.00 0.00 Implementati 2020-01-31 2020-03-27 2020-05-26 iniciar del Proyecto CRECER Quotations Envelope Evaluation on SANO: Salud y Nutrición) GT-MSPAS-228510-NC-RFQ / Material para trabajo comunitario del Plan Support the Borrower’s Pending Pertinencia Cultural y Material Request for Single Stage - One IBRD / 87300 response to the COVID-19 Post Open - National 310,000.00 0.00 Implementati 2021-04-22 2021-06-22 2021-08-21 de promoción para la Gestión Quotations Envelope pandemic on de riesgo nutricional y de salud ante la pandemia COVID- 19 Providing Inter-sectoral Under GT-MSPAS-228940-NC-RFB Single Stage - One IBRD / 87300 Services to Address Chronic Post Request for Bids Open - National 640,785.00 0.00 Implementati 2021-04-16 2021-05-27 2021-04-19 2021-05-19 2021-05-31 2021-07-02 2021-08-25 / Servicios de impresión Envelope Malnutrition Risk Factors on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GT-MSPAS-119085-CS-LCS / Supporting Project Least Cost Auditoria Externa del año IBRD / 87300 Management, Monitoring and Post Open - National 135,000.00 118,630.88 Signed 2019-10-27 2021-02-09 2019-11-17 2019-12-31 2021-02-22 2020-01-28 2021-03-23 2020-02-27 2021-03-26 2020-04-02 2021-04-12 2020-05-07 2021-05-03 2020-11-03 Selection 2019 al 2024 Evaluation GT-MSPAS-119098-CS-QCBS Supporting Project Quality And Cost- Pending / Consultoria para verificar IBRD / 87300 Management, Monitoring and Post Open - National 100,000.00 0.00 2020-01-01 2020-01-22 2020-03-06 2020-04-03 2020-05-03 2020-06-07 2020-07-12 2021-07-12 Based Selection Implementation indicadores componente 2 Evaluation GT-MSPAS-118879-CS-QCBS Supporting Project Quality And Cost- Pending / Evaluación de medio y fin de IBRD / 87300 Management, Monitoring and Post Open - International 750,000.00 0.00 2020-01-26 2020-02-16 2020-03-31 2020-04-28 2020-05-28 2020-07-02 2020-08-06 2021-08-06 Based Selection Implementation término Evaluation GT-MSPAS-119086-CS-QCBS / Estrategia de comunicación Providing Inter-sectoral nacional (sensibilización) Quality And Cost- Pending IBRD / 87300 Services to Address Chronic Post Open - International 930,000.00 0.00 2020-01-26 2020-02-16 2020-03-31 2020-04-28 2020-05-28 2020-07-02 2020-08-06 2021-08-06 SESAN (spots radio, televisión, Based Selection Implementation Malnutrition Risk Factors redes sociales, publicidad en prensa escrita y traducciones) GT-MSPAS-119092-CS-CQS / Consultoría para diseño y montaje de curso en línea de Providing Inter-sectoral Consultant Pending gestión para la prevención de IBRD / 87300 Services to Address Chronic Post Qualification Open - National 15,000.00 0.00 2020-01-26 2020-02-16 2020-03-31 2020-04-30 2020-06-04 2020-12-01 Implementation la desnutrición crónica, Malnutrition Risk Factors Selection orientado a funcionarios públicos SESAN GT-MSPAS-119093-CS-CQS / Consultoria para facilitar los Providing Inter-sectoral Consultant Pending talleres de fortalecimiento IBRD / 87300 Services to Address Chronic Post Qualification Open - National 116,000.00 0.00 2020-01-26 2020-02-16 2020-03-31 2020-04-30 2020-06-04 2020-12-01 Implementation institucional y cursos en linea Malnutrition Risk Factors Selection SESAN GT-MSPAS-119094-CS-CQS Providing Inter-sectoral Consultant / Estudio socio cultural de Pending IBRD / 87300 Services to Address Chronic Post Qualification Open - National 50,000.00 0.00 2020-01-26 2020-02-16 2020-03-31 2020-04-30 2020-06-04 2020-12-01 programa de transferencias Implementation Malnutrition Risk Factors Selection condicionadas MIDES GT-MSPAS-119097-CS-QCBS Providing Inter-sectoral / Consultoria para desarrollo Quality And Cost- Pending IBRD / 87300 Services to Address Chronic Post Open - International 300,000.00 0.00 2020-01-26 2020-02-16 2020-03-31 2020-04-28 2020-05-28 2020-07-02 2020-08-06 2021-08-06 y vinculación de sistemas de Based Selection Implementation Malnutrition Risk Factors información MIDES-MSPAS GT-MSPAS-213898-CS-QCBS Providing Inter-sectoral / Consultoría de Supervisión Quality And Cost- Under IBRD / 87300 Services to Address Chronic Post Open - National 1,800,000.00 0.00 2021-01-22 2021-03-03 2021-02-06 2021-02-24 2021-03-24 2021-04-03 2021-04-19 2021-05-15 2022-05-15 de Remozamiento de puestos Based Selection Implementation Malnutrition Risk Factors de Salud GT-MSPAS-213901-CS-QCBS Providing Inter-sectoral / Consultoría para Pre Quality And Cost- Under IBRD / 87300 Services to Address Chronic Post Open - National 1,000,000.00 0.00 2021-01-29 2021-03-03 2021-02-19 2021-03-11 2021-04-08 2021-04-18 2021-05-06 2021-06-01 2022-06-01 inversión de nuevos Puestos Based Selection Implementation Malnutrition Risk Factors de Salud GT-MSPAS-228508-CS-QCBS / Servicios de consultoría para Support the Borrower’s Gestión de pauta radiofónica, Quality And Cost- Under IBRD / 87300 response to the COVID-19 Post Open - National 330,000.00 0.00 2021-04-12 2021-04-14 2021-04-22 2021-05-21 2021-06-20 2021-06-29 2021-07-12 2021-07-30 2021-11-02 filmación, edición e Based Selection Implementation pandemic interpretación a idiomas mayas INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GT-MSPAS-119099-CS-INDV Supporting Project Individual / 3 consultores para Pending IBRD / 87300 Management, Monitoring and Post Consultant Open 355,000.00 0.00 2020-01-01 2020-01-30 2020-02-09 2020-02-29 2023-12-31 monitoreo de avances SESAN Implementation Evaluation Selection US$2000 mensuales Supporting Project Individual GT-MSPAS-119100-CS-INDV Pending IBRD / 87300 Management, Monitoring and Post Consultant Open 67,500.00 0.00 2020-01-01 2020-01-30 2020-02-09 2020-02-29 2021-12-31 / Estudio de Aflatoxinas Implementation Evaluation Selection GT-MSPAS-119101-CS-INDV / Asistencia técnica para Supporting Project Individual Pending mejorar programa de IBRD / 87300 Management, Monitoring and Post Consultant Open 96,000.00 0.00 2020-01-01 2020-01-30 2020-02-09 2020-02-29 2021-12-31 Implementation transferencias condicionadas Evaluation Selection de MIDES (3 consultores) GT-MSPAS-119106-CS-INDV Supporting Project Individual / Responsable de IBRD / 87300 Management, Monitoring and Post Consultant Open 178,500.00 0.00 Canceled 2019-10-08 2019-10-09 2019-10-23 2019-10-24 2019-11-04 2024-01-31 Adquisiciones (US$3,500 Evaluation Selection mensuales) 5 años Page 3 GT-MSPAS-119107-CS-INDV Supporting Project Individual / Especialista en IBRD / 87300 Management, Monitoring and Post Consultant Open 180,000.00 77,111.85 Signed 2019-10-08 2019-10-10 2019-10-23 2019-11-08 2019-10-24 2019-11-15 2019-11-04 2020-03-12 2024-01-31 Adquisiciones 1 (US$3,000 Evaluation Selection mensuales) 5 años GT-MSPAS-119108-CS-INDV Supporting Project Individual / Especialista en Pending IBRD / 87300 Management, Monitoring and Post Consultant Open 162,000.00 0.00 2020-01-01 2020-01-30 2020-02-09 2020-02-29 2024-08-02 Adquisiciones 2 (US$3,000 Implementation Evaluation Selection mensuales) 4.5 años GT-MSPAS-119109-CS-INDV Supporting Project Individual / Responsable Financiero IBRD / 87300 Management, Monitoring and Post Consultant Open 178,500.00 0.00 Canceled 2019-10-08 2019-10-10 2019-10-23 2019-10-24 2019-11-04 2024-01-31 (US$3,500 mensuales) 5 años Evaluation Selection GT-MSPAS-119112-CS-INDV Supporting Project Individual Pending / 9 facilitadores MSPAS (áreas IBRD / 87300 Management, Monitoring and Prior Consultant Open 540,000.00 0.00 2020-01-01 2020-01-30 2020-02-09 2020-02-29 2021-12-31 Implementation de salud) Evaluation Selection GT-MSPAS-136240-CS-INDV Supporting Project Individual Pending / Especialista Construcción IBRD / 87300 Management, Monitoring and Post Consultant Open 72,000.00 0.00 2021-03-01 2021-03-30 2021-04-09 2021-04-29 2023-04-30 Implementation Puestos de Salud Evaluation Selection GT-MSPAS-136560-CS-INDV Providing Inter-sectoral Individual Pending / Especialista Legal Puestos IBRD / 87300 Services to Address Chronic Post Consultant Open 135,000.00 0.00 2020-11-13 2020-12-08 2020-12-13 2020-12-30 2021-12-31 Implementation de Salud Malnutrition Risk Factors Selection GT-MSPAS-139672-CS-INDV Supporting Project Individual / Especialista Financiero IBRD / 87300 Management, Monitoring and Post Consultant Open 153,000.00 77,061.72 Signed 2019-10-10 2019-10-14 2019-10-23 2019-11-08 2019-10-27 2019-11-02 2020-03-12 2024-01-31 (US$3,000 mensuales) Evaluation Selection GT-MSPAS-139673-CS-INDV Supporting Project Individual / Especialista en Planeación IBRD / 87300 Management, Monitoring and Post Consultant Open 153,000.00 0.00 Canceled 2019-10-11 2019-10-14 2019-10-27 2019-10-29 2019-11-01 2024-02-01 Estratégica y Presupuestaria Evaluation Selection (US$3,000 mensuales) GT-MSPAS-118755-CS-INDV Supporting Project Individual / Responsable de IBRD / 87300 Management, Monitoring and Prior Consultant Open 178,500.00 0.00 Canceled 2019-10-10 2019-10-14 2019-10-26 2019-10-28 2019-10-31 2024-01-31 Infraestructura (US$3,500 Evaluation Selection mensuales) GT-MSPAS-119110-CS-INDV / Especialista de Monitoreo, Supporting Project Individual Evaluación, Supervisión y IBRD / 87300 Management, Monitoring and Post Consultant Open 153,000.00 77,072.09 Signed 2019-10-11 2019-10-14 2019-10-26 2019-11-08 2019-10-28 2019-10-31 2020-03-11 2024-01-31 Seguimiento de Indicadores Evaluation Selection del Proyecto (US$3,000 mensuales) GT-MSPAS-139765-CS-INDV Supporting Project Individual / Responsable de IBRD / 87300 Management, Monitoring and Prior Consultant Open 178,500.00 89,883.37 Signed 2019-10-10 2019-10-14 2019-10-26 2019-11-11 2019-10-29 2020-05-11 2019-10-31 2020-03-12 2024-01-31 Adquisiciones (US$3,500 Evaluation Selection mensuales) GT-MSPAS-139766-CS-INDV Supporting Project Individual / Responsable Financiero IBRD / 87300 Management, Monitoring and Prior Consultant Open 178,500.00 0.00 Canceled 2019-10-10 2019-10-14 2019-10-26 2019-10-28 2019-10-31 2024-01-31 (US$3,500 mensuales) Evaluation Selection GT-MSPAS-119102-CS-INDV Supporting Project Individual / Especialista en Agua Potable IBRD / 87300 Management, Monitoring and Post Consultant Open 153,000.00 0.00 Canceled 2019-10-08 2019-10-14 2019-10-26 2019-10-28 2019-10-31 2024-01-31 y saneamiento (US$3,000 Evaluation Selection mensuales) GT-MSPAS-136256-CS-INDV Supporting Project Individual / Especialista Cambio de IBRD / 87300 Management, Monitoring and Post Consultant Open 153,000.00 0.00 Canceled 2019-10-08 2019-10-14 2019-10-26 2019-10-28 2019-10-31 2024-01-31 Comportamiento Agua Evaluation Selection Saneamiento e Higiene GT-MSPAS-119111-CS-INDV Supporting Project Individual / Especialista en Salvaguardas IBRD / 87300 Management, Monitoring and Post Consultant Open 153,000.00 77,072.09 Signed 2019-10-11 2019-10-14 2019-10-26 2019-11-08 2019-10-28 2019-10-31 2020-03-12 2024-01-31 ambientales (US$3,000 Evaluation Selection mensuales) 5 años GT-MSPAS-144421-CS-INDV Supporting Project Individual / Responsable en IBRD / 87300 Management, Monitoring and Prior Consultant Open 178,500.00 84,450.53 Signed 2019-11-05 2019-11-11 2019-11-08 2019-11-11 2019-11-09 2020-05-11 2019-11-11 2020-03-12 2024-01-31 Adquisiciones / Consultor en Evaluation Selection Adquisiciones nivel 1 GT-MSPAS-118755-CS-INDV- Supporting Project Individual 2 / Consultor de IBRD / 87300 Management, Monitoring and Prior Consultant Open 171,500.00 74,049.66 Signed 2019-12-27 2020-02-03 2020-01-20 2020-03-30 2020-01-22 2020-05-11 2020-01-25 2020-04-01 2024-01-31 Infraestructura de Salud y Evaluation Selection Agua nivel 1 GT-MSPAS-139673-CS-INDV- Supporting Project Individual 2 / Consultor de Planeación IBRD / 87300 Management, Monitoring and Post Consultant Open 147,000.00 0.00 Canceled 2019-12-27 2020-01-31 2020-01-20 2020-03-30 2020-01-22 2020-01-25 2024-01-31 Estratégica y Presupuestaria Evaluation Selection nivel 2 GT-MSPAS-139766-CS-INDV- Supporting Project Individual 2 / Consultor Financiero nivel IBRD / 87300 Management, Monitoring and Prior Consultant Open 171,500.00 0.00 Canceled 2019-12-27 2020-02-04 2020-01-20 2020-03-30 2020-01-22 2020-01-25 2024-01-31 1 Evaluation Selection GT-MSPAS-136256-CS-INDV- Supporting Project Individual 2 / Consultor Cambio de IBRD / 87300 Management, Monitoring and Post Consultant Open 147,000.00 0.00 Under Review 2019-12-27 2020-01-31 2020-01-20 2020-01-22 2020-01-25 2024-01-31 Comportamiento en Agua y Evaluation Selection Saneamiento e Higiene nivel 2 GT-MSPAS-119102-CS-INDV- Supporting Project Individual 2 / Especialista de Agua, IBRD / 87300 Management, Monitoring and Post Consultant Open 147,000.00 30,041.45 Completed 2019-12-27 2020-02-05 2020-01-20 2020-03-30 2020-01-22 2020-01-25 2020-04-01 2024-01-31 2021-01-31 Saneamiento e Higiene Rural / Evaluation Selection Consultor nivel 2 GT-MSPAS-118884-CS-INDV Supporting Project Individual / Consultor Principal Crecer IBRD / 87300 Management, Monitoring and Prior Consultant Open 180,000.00 0.00 Under Review 2020-03-25 2020-04-24 2020-04-27 2020-04-30 2024-01-31 Sano Evaluation Selection GT-MSPAS-165182-CS-INDV Supporting Project Individual / Especialista Administrativo / IBRD / 87300 Management, Monitoring and Post Consultant Open 135,000.00 57,493.21 Signed 2020-03-26 2020-03-25 2020-04-26 2020-05-29 2020-04-28 2020-07-07 2020-05-03 2020-06-01 2024-01-31 consultor nivel 2 Evaluation Selection Page 4 GT-MSPAS-165183-CS-INDV Supporting Project Individual / Especialista Salvaguarda IBRD / 87300 Management, Monitoring and Post Consultant Open 135,000.00 54,260.95 Signed 2020-03-26 2020-03-25 2020-04-26 2020-06-23 2020-04-28 2020-07-07 2020-05-03 2020-07-01 2024-01-31 Manejo Social / consultor Evaluation Selection nivel 2 GT-MSPAS-165184-CS-INDV / Especialista en Gestión Supporting Project Individual Social y Comunitaria Agua y IBRD / 87300 Management, Monitoring and Post Consultant Open 135,000.00 57,493.21 Signed 2020-03-26 2020-03-25 2020-04-26 2020-05-29 2020-04-28 2020-07-07 2020-05-03 2020-06-01 2024-01-31 Saneamiento / consultor nivel Evaluation Selection 2 GT-MSPAS-165185-CS-INDV Supporting Project Individual / Capacitación y Formación en IBRD / 87300 Management, Monitoring and Post Consultant Open 135,000.00 54,260.95 Signed 2020-03-26 2020-03-25 2020-04-26 2020-05-29 2020-04-28 2020-07-07 2020-05-03 2020-07-01 2024-01-31 APS / consultor nivel 2 Evaluation Selection GT-MSPAS-165187-CS-INDV Supporting Project Individual / Gestión Logística y Cadena IBRD / 87300 Management, Monitoring and Post Consultant Open 135,000.00 54,301.61 Signed 2020-03-26 2020-03-25 2020-04-26 2020-05-29 2020-04-28 2020-07-07 2020-05-03 2020-07-01 2024-01-31 de Suministro en APS / Evaluation Selection consultor nivel 2 GT-MSPAS-165191-CS-INDV Supporting Project Individual / Asistente de Monitoreo / IBRD / 87300 Management, Monitoring and Post Consultant Open 90,000.00 36,201.08 Signed 2020-03-26 2020-03-25 2020-04-26 2020-05-29 2020-04-28 2020-07-07 2020-05-03 2020-07-01 2024-01-31 consultor nivel 3 Evaluation Selection GT-MSPAS-165192-CS-INDV Supporting Project Individual / Analista Contable / IBRD / 87300 Management, Monitoring and Post Consultant Open 90,000.00 37,315.82 Signed 2020-03-26 2020-03-25 2020-04-26 2020-05-29 2020-04-28 2020-07-07 2020-05-03 2020-06-16 2024-01-31 consultor nivel 3 Evaluation Selection GT-MSPAS-165176-CS-INDV Supporting Project Individual / Consultor APS y Nutrición IBRD / 87300 Management, Monitoring and Post Consultant Open 157,500.00 0.00 Canceled 2020-03-26 2020-03-25 2020-04-26 2020-04-27 2020-05-03 2024-01-31 nivel 1 Evaluation Selection GT-MSPAS-165179-CS-INDV Supporting Project Individual / Consultor Cambio de IBRD / 87300 Management, Monitoring and Post Consultant Open 157,500.00 63,351.88 Signed 2020-03-26 2020-03-25 2020-04-26 2020-05-29 2020-04-27 2020-07-06 2020-05-03 2020-07-01 2024-01-31 Comportamiento nivel 1 Evaluation Selection GT-MSPAS-136243-CS-INDV Supporting Project Individual / Especialista Remozamiento IBRD / 87300 Management, Monitoring and Post Consultant Open 72,000.00 57,493.21 Terminated 2020-03-31 2020-04-01 2020-04-23 2020-05-26 2020-04-24 2020-07-06 2020-05-03 2020-06-01 2022-04-30 Puestos de Salud / consultor Evaluation Selection nivel 2 GT-MSPAS-167126-CS-INDV / Técnico de Monitoreo y Providing Inter-sectoral Individual manejo de Información para IBRD / 87300 Services to Address Chronic Post Consultant Open 87,750.00 38,328.81 Signed 2020-03-31 2020-04-01 2020-04-23 2020-05-29 2020-04-24 2020-07-07 2020-05-03 2020-06-01 2024-01-31 Agua y Saneamiento e Higiene Malnutrition Risk Factors Selection / consultor nivel 3 GT-MSPAS-167129-CS-INDV Providing Inter-sectoral Individual / Consultor para el Diseño de IBRD / 87300 Services to Address Chronic Post Consultant Open 28,800.00 29,060.80 Completed 2020-03-31 2020-04-01 2020-04-23 2020-07-13 2020-04-24 2020-07-13 2020-05-03 2020-08-03 2020-09-30 2021-02-26 4 topologías de Puestos de Malnutrition Risk Factors Selection Salud GT-MSPAS-167134-CS-INDV Providing Inter-sectoral Individual / Consultor 1 para IBRD / 87300 Services to Address Chronic Post Consultant Open 25,000.00 80.60 Terminated 2020-03-31 2020-04-01 2020-04-23 2020-06-04 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 Diagnóstico de Agua y Malnutrition Risk Factors Selection Saneamiento (19 producto) GT-MSPAS-167135-CS-INDV Providing Inter-sectoral Individual / Consultor 2 para IBRD / 87300 Services to Address Chronic Post Consultant Open 25,000.00 25,112.69 Completed 2020-03-31 2020-04-01 2020-04-23 2020-06-04 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 2021-02-02 Diagnóstico de Agua y Malnutrition Risk Factors Selection Saneamiento (19 producto) GT-MSPAS-167136-CS-INDV Providing Inter-sectoral Individual / Consultor 3 para IBRD / 87300 Services to Address Chronic Post Consultant Open 25,000.00 25,112.69 Completed 2020-03-31 2020-04-01 2020-04-23 2020-06-04 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 2021-02-02 Diagnóstico de Agua y Malnutrition Risk Factors Selection Saneamiento (19 producto) GT-MSPAS-167137-CS-INDV Providing Inter-sectoral Individual / Consultor 4 para IBRD / 87300 Services to Address Chronic Post Consultant Open 25,000.00 25,112.69 Completed 2020-03-31 2020-04-01 2020-04-23 2020-06-04 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 2021-02-02 Diagnóstico de Agua y Malnutrition Risk Factors Selection Saneamiento (19 producto) GT-MSPAS-167138-CS-INDV Providing Inter-sectoral Individual / Consultor 5 para IBRD / 87300 Services to Address Chronic Post Consultant Open 25,000.00 25,112.69 Completed 2020-03-31 2020-04-01 2020-04-23 2020-06-04 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 2021-02-02 Diagnóstico de Agua y Malnutrition Risk Factors Selection Saneamiento (19 producto) GT-MSPAS-167139-CS-INDV Providing Inter-sectoral Individual / Consultor 6 para IBRD / 87300 Services to Address Chronic Post Consultant Open 25,000.00 80.60 Terminated 2020-03-31 2020-04-01 2020-04-23 2020-06-04 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 Diagnóstico de Agua y Malnutrition Risk Factors Selection Saneamiento (19 producto) GT-MSPAS-167140-CS-INDV Providing Inter-sectoral Individual / Consultor 7 para IBRD / 87300 Services to Address Chronic Post Consultant Open 25,000.00 80.60 Terminated 2020-03-31 2020-04-01 2020-04-23 2020-06-04 2020-04-24 2020-07-06 2020-05-03 2020-08-03 2020-10-30 Diagnóstico de Agua y Malnutrition Risk Factors Selection Saneamiento (19 producto) GT-MSPAS-167141-CS-INDV / Consultor 1 para la Providing Inter-sectoral Individual preinversión de IBRD / 87300 Services to Address Chronic Post Consultant Open 48,000.00 84,807.73 Signed 2020-03-31 2020-04-01 2020-04-23 2020-05-29 2020-04-24 2020-07-06 2020-05-03 2020-08-03 2020-10-30 Remozamiento de Puestos de Malnutrition Risk Factors Selection Salud GT-MSPAS-167142-CS-INDV / Consultor 2 para la Providing Inter-sectoral Individual preinversión de IBRD / 87300 Services to Address Chronic Post Consultant Open 48,000.00 84,807.73 Signed 2020-03-31 2020-04-01 2020-04-23 2020-05-29 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 Remozamiento de Puestos de Malnutrition Risk Factors Selection Salud GT-MSPAS-167143-CS-INDV / Consultor 3 para la Providing Inter-sectoral Individual preinversión de IBRD / 87300 Services to Address Chronic Post Consultant Open 48,000.00 84,807.73 Signed 2020-03-31 2020-04-01 2020-04-23 2020-05-27 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 Remozamiento de Puestos de Malnutrition Risk Factors Selection Salud GT-MSPAS-167144-CS-INDV / Consultor 4 para la Providing Inter-sectoral Individual preinversión de IBRD / 87300 Services to Address Chronic Post Consultant Open 48,000.00 84,807.73 Signed 2020-03-31 2020-04-01 2020-04-23 2020-05-27 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 Remozamiento de Puestos de Malnutrition Risk Factors Selection Salud Page 5 GT-MSPAS-167145-CS-INDV / Consultor 5 para la Providing Inter-sectoral Individual preinversión de IBRD / 87300 Services to Address Chronic Post Consultant Open 48,000.00 84,807.73 Signed 2020-03-31 2020-04-01 2020-04-23 2020-05-27 2020-04-24 2020-07-07 2020-05-03 2020-08-03 2020-10-30 Remozamiento de Puestos de Malnutrition Risk Factors Selection Salud GT-MSPAS-167146-CS-INDV / Consultor 6 para la Providing Inter-sectoral Individual preinversión de IBRD / 87300 Services to Address Chronic Post Consultant Open 48,000.00 84,807.73 Signed 2020-03-31 2020-04-01 2020-04-23 2020-05-27 2020-04-24 2020-07-06 2020-05-03 2020-08-03 2020-10-30 Remozamiento de Puestos de Malnutrition Risk Factors Selection Salud GT-MSPAS-177994-CS-CDS Supporting Project / Profesional Gestor / IBRD / 87300 Management, Monitoring and Prior Direct Selection Direct 24,000.00 0.00 Canceled 2020-06-05 2020-06-05 2020-06-09 2020-06-05 2020-07-01 2020-12-31 Coordinador del Proyecto Evaluation Supporting Project Individual GT-MSPAS-178012-CS-INDV IBRD / 87300 Management, Monitoring and Prior Consultant Limited 150,500.00 0.00 Canceled 2020-06-05 2020-06-05 2020-06-10 2020-06-20 2020-07-01 2024-01-31 / Consultor Financiero nivel 1 Evaluation Selection GT-MSPAS-178015-CS-INDV Supporting Project Individual / Consultor APS y Nutrición IBRD / 87300 Management, Monitoring and Post Consultant Limited 150,500.00 0.00 Canceled 2020-06-05 2020-06-05 2020-06-10 2020-06-20 2020-07-01 2024-01-31 Nivel 1 Evaluation Selection Supporting Project Individual GT-MSPAS-178215-CS-INDV IBRD / 87300 Management, Monitoring and Prior Consultant Limited 150,500.00 63,215.26 Signed 2020-06-05 2020-06-05 2020-06-10 2020-06-15 2020-06-20 2020-06-19 2020-07-01 2020-07-01 2024-01-31 / Consultor Financiero nivel 1 Evaluation Selection GT-MSPAS-180184-CS-CDS Supporting Project / Profesional Gestor / IBRD / 87300 Management, Monitoring and Prior Direct Selection Direct 174,000.00 25,232.57 Completed 2020-06-15 2020-06-16 2020-06-15 2020-06-05 2020-06-16 2020-06-24 2020-12-13 2020-12-31 Coordinador del Proyecto Evaluation GT-MSPAS-182138-CS-INDV Supporting Project Individual / Analista Contable / IBRD / 87300 Management, Monitoring and Post Consultant Open 86,000.00 36,177.84 Signed 2020-06-26 2020-03-25 2020-06-26 2020-07-09 2020-06-29 2020-07-09 2020-07-01 2020-07-01 2024-01-31 Consultor nivel 3 Evaluation Selection GT-MSPAS-165188-CS-INDV Supporting Project Individual / Especialista en Nutrición en IBRD / 87300 Management, Monitoring and Post Consultant Open 135,000.00 0.00 Canceled 2020-03-26 2020-03-25 2020-04-26 2020-04-28 2020-05-03 2024-01-31 APS / consultor nivel 2 Evaluation Selection GT-MSPAS-165180-CS-INDV Supporting Project Individual / Facilitador de la Gestión IBRD / 87300 Management, Monitoring and Post Consultant Open 135,000.00 0.00 Canceled 2020-03-26 2020-03-25 2020-04-26 2020-04-27 2020-05-03 2024-01-31 Crecer Sano / consultor nivel Evaluation Selection 1 GT-MSPAS-165186-CS-INDV Supporting Project Individual / Calidad de la APS y IBRD / 87300 Management, Monitoring and Post Consultant Open 135,000.00 0.00 Canceled 2020-03-26 2020-03-25 2020-04-26 2020-04-28 2020-05-03 2024-01-31 Fortalecimiento de Estrategias Evaluation Selection / consultor nivel 2 GT-MSPAS-182177-CS-INDV Supporting Project Individual / Facilitador de la Gestión IBRD / 87300 Management, Monitoring and Post Consultant Direct 150,500.00 59,570.26 Signed 2020-06-26 2020-07-09 2020-06-29 2020-07-14 2020-06-30 2020-09-29 2020-07-01 2020-08-03 2024-01-31 Crecer Sano / consultor nivel Evaluation Selection 1 GT-MSPAS-182178-CS-INDV Supporting Project Individual / Especialista en Nutrición en IBRD / 87300 Management, Monitoring and Post Consultant Direct 129,000.00 51,064.99 Signed 2020-06-26 2020-07-09 2020-06-29 2020-07-14 2020-06-30 2020-07-21 2020-07-01 2020-08-03 2024-01-31 APS / consultor nivel 2 Evaluation Selection GT-MSPAS-182179-CS-INDV Supporting Project Individual / Calidad de la APS y IBRD / 87300 Management, Monitoring and Post Consultant Direct 129,000.00 52,876.32 Signed 2020-06-26 2020-07-09 2020-06-29 2020-07-14 2020-06-30 2020-07-15 2020-07-01 2020-07-15 2024-01-31 Fortalecimiento de Estrategias Evaluation Selection / consultor nivel 2 GT-MSPAS-185163-CS-INDV Supporting Project Individual / Consultor APS y Nutrición IBRD / 87300 Management, Monitoring and Post Consultant Direct 147,000.00 59,616.65 Signed 2020-07-22 2020-07-22 2020-07-29 2020-07-27 2020-07-30 2020-07-29 2020-08-03 2020-08-03 2024-01-31 Nivel 1 Evaluation Selection GT-MSPAS-194794-CS-INDV / Diseño Estructural Módulos Support the Borrower’s Individual prefabricados Anexo COVID- IBRD / 87300 response to the COVID-19 Post Consultant Open 19,871.79 0.00 Canceled 2020-09-16 2020-09-17 2020-09-28 2020-10-06 2020-09-28 2020-10-08 2020-10-19 2020-11-03 19 Hospital Nacional de San pandemic Selection Marcos GT-MSPAS-194795-CS-INDV / Diseño Módulos Support the Borrower’s Individual prefabricados Anexo COVID- IBRD / 87300 response to the COVID-19 Post Consultant Open 22,820.51 22,835.15 Completed 2020-09-16 2020-09-17 2020-09-28 2020-10-06 2020-09-28 2020-10-08 2020-10-05 2020-11-20 2020-11-04 2020-12-19 19 Hospital Nacional de San pandemic Selection Marcos GT-MSPAS-194796-CS-INDV / Estudio de suelos para Support the Borrower’s Individual Módulos prefabricados Anexo IBRD / 87300 response to the COVID-19 Post Consultant Open 3,205.13 3,207.18 Completed 2020-09-16 2020-09-17 2020-09-28 2020-10-06 2020-09-28 2020-10-08 2020-10-05 2020-11-30 2020-10-15 2020-12-09 COVID-19 Hospital Nacional pandemic Selection de San Marcos GT-MSPAS-194797-CS-INDV / Diseño Eléctrico para Support the Borrower’s Individual Módulos prefabricados Anexo IBRD / 87300 response to the COVID-19 Post Consultant Open 9,615.38 9,621.55 Completed 2020-09-16 2020-09-17 2020-09-28 2020-10-06 2020-09-28 2020-10-08 2020-10-05 2020-11-16 2020-11-04 2020-12-31 COVID-19 Hospital Nacional pandemic Selection de San Marcos GT-MSPAS-194798-CS-INDV / Supervisor 1 Módulos Support the Borrower’s Individual Under prefabricados Anexo COVID- IBRD / 87300 response to the COVID-19 Post Consultant Open 32,000.00 0.00 2020-09-16 2020-09-17 2020-10-07 2020-10-07 2020-10-09 2020-10-09 2020-11-03 2021-07-31 Implementation 19 Hospital Nacional de San pandemic Selection Marcos GT-MSPAS-194799-CS-INDV / Supervisor 2 Módulos Support the Borrower’s Individual Under prefabricados Anexo COVID- IBRD / 87300 response to the COVID-19 Post Consultant Open 32,000.00 0.00 2020-09-16 2020-09-17 2020-10-07 2020-10-07 2020-10-09 2020-10-12 2020-11-03 2021-07-31 Implementation 19 Hospital Nacional de San pandemic Selection Marcos GT-MSPAS-194800-CS-INDV / Supervisor 3 Módulos Support the Borrower’s Individual Under prefabricados Anexo COVID- IBRD / 87300 response to the COVID-19 Post Consultant Open 32,000.00 0.00 2020-09-16 2020-09-17 2020-10-07 2020-10-07 2020-10-09 2020-10-09 2020-11-03 2021-07-31 Implementation 19 Hospital Nacional de San pandemic Selection Marcos Page 6 GT-MSPAS-196029-CS-INDV Supporting Project Individual / Enlace Gestión Proyecto IBRD / 87300 Management, Monitoring and Post Consultant Direct 120,000.00 0.00 Under Review 2020-09-23 2020-10-27 2020-09-25 2020-09-28 2020-10-01 2024-01-31 Crecer Sano- MIDES / Evaluation Selection Consultor nivel 2 GT-MSPAS-202005-CS-INDV Providing Inter-sectoral Individual / Punto Focal MIDES-MSPAS Under IBRD / 87300 Services to Address Chronic Post Consultant Direct 117,000.00 0.00 2020-10-28 2020-11-11 2020-10-28 2020-11-12 2020-10-30 2020-11-02 2024-03-03 Proyecto Crecer Sano / Implementation Malnutrition Risk Factors Selection Consultor Nivel 2 GT-MSPAS-204780-CS-INDV / Consultor Revisor 1 Providing Inter-sectoral Individual Preinversión Módulos IBRD / 87300 Services to Address Chronic Post Consultant Direct 4,000.00 4,002.57 Completed 2020-11-13 2020-11-16 2020-11-18 2020-11-19 2020-11-19 2020-11-19 2020-11-25 2020-11-30 2020-12-28 2020-12-31 Prefabricados Anexo COVID- Malnutrition Risk Factors Selection 19 Hospital Nacional de San Marcos GT-MSPAS-204781-CS-INDV / Consultor Revisor 2 Providing Inter-sectoral Individual Preinversión Módulos IBRD / 87300 Services to Address Chronic Post Consultant Direct 4,000.00 4,002.57 Completed 2020-11-13 2020-11-16 2020-11-18 2020-11-19 2020-11-19 2020-11-19 2020-11-25 2020-11-30 2020-12-28 2020-12-31 Prefabricados Anexo COVID- Malnutrition Risk Factors Selection 19 Hospital Nacional de San Marcos GT-MSPAS-204782-CS-INDV / Consultor Revisor 3 Providing Inter-sectoral Individual Preinversión Módulos IBRD / 87300 Services to Address Chronic Post Consultant Direct 4,000.00 4,002.57 Completed 2020-11-13 2020-11-16 2020-11-18 2020-11-19 2020-11-19 2020-11-19 2020-11-25 2020-11-30 2020-12-28 2020-12-31 Prefabricados Anexo COVID- Malnutrition Risk Factors Selection 19 Hospital Nacional de San Marcos GT-MSPAS-204784-CS-INDV / Diseño Estructural Módulos Support the Borrower’s Individual prefabricados Anexo COVID- IBRD / 87300 response to the COVID-19 Post Consultant Direct 19,875.00 19,884.54 Completed 2020-11-13 2020-11-16 2020-11-18 2020-11-19 2020-11-19 2020-11-19 2020-11-25 2020-11-27 2020-12-28 2020-12-11 19 Hospital Nacional de San pandemic Selection Marcos GT-MSPAS-218154-CS-INDV Supporting Project Individual / Profesional de Salvaguardas IBRD / 87300 Management, Monitoring and Post Consultant Direct 92,400.00 28,510.33 Signed 2021-02-08 2021-02-16 2021-02-11 2021-02-26 2021-02-16 2021-02-26 2021-03-01 2021-03-01 2024-01-31 Ambientales Evaluation Selection GT-MSPAS-222384-CS-INDV Supporting Project Individual / Profesional Gestión / IBRD / 87300 Management, Monitoring and Post Consultant Direct 140,000.00 35,850.45 Signed 2021-03-03 2021-03-05 2021-03-07 2021-03-08 2021-03-09 2021-04-14 2021-03-15 2021-04-05 2024-01-31 Coordinación de Proyecto Evaluation Selection GT-MSPAS-222453-CS-INDV Supporting Project Individual / Responsable de Agua IBRD / 87300 Management, Monitoring and Post Consultant Limited 113,000.00 0.00 Canceled 2021-03-03 2021-03-04 2021-03-05 2021-03-05 2021-03-10 2021-03-27 2024-01-31 Saneamiento e Higiene Rural Evaluation Selection GT-MSPAS-222454-CS-INDV Supporting Project Individual / Especialista de Agua, Under IBRD / 87300 Management, Monitoring and Post Consultant Limited 105,000.00 0.00 2021-03-03 2021-03-04 2021-03-05 2021-03-25 2021-03-10 2021-04-09 2021-03-23 2024-01-31 Saneamiento e Higiene Rural / Implementation Evaluation Selection Consultor nivel 2 GT-MSPAS-229746-CS-INDV Supporting Project Individual Under / Responsable de Agua IBRD / 87300 Management, Monitoring and Post Consultant Open 102,564.00 0.00 2021-04-19 2021-04-19 2021-05-12 2021-05-17 2021-05-27 2024-01-31 Implementation Saneamiento e Higiene Rural Evaluation Selection GT-MSPAS-231305-CS-INDV / Consultor/a Facilitador/a de Providing Inter-sectoral Individual los proceso técnico y Under IBRD / 87300 Services to Address Chronic Post Consultant Direct 99,000.00 0.00 2021-04-23 2021-04-27 2021-05-01 2021-05-06 2021-05-04 2021-05-07 2021-05-19 2024-01-31 administrativo de las Implementation Malnutrition Risk Factors Selection actividades del Proyecto Crecer Sano en SESAN Nivel 2 GT-MSPAS-231893-CS-INDV Supporting Project Individual / Especialista Remozamientos Under IBRD / 87300 Management, Monitoring and Post Consultant Open 75,000.00 0.00 2021-04-29 2021-05-04 2021-04-30 2021-05-01 2021-05-03 2023-05-23 Puestos de Salud / Consultor Implementation Evaluation Selection nivel 2 GT-MSPAS-233091-CS-INDV Providing Inter-sectoral Individual / Comunicador para IBRD / 87300 Services to Address Chronic Post Consultant Open 84,800.00 0.00 Canceled 2021-05-19 2021-05-24 2021-06-09 2021-06-11 2021-06-15 2024-01-31 información y divulgación Malnutrition Risk Factors Selection GT-MSPAS-240137-CS-INDV Supporting Project Individual Under / Consultor en Comunicación IBRD / 87300 Management, Monitoring and Post Consultant Open 90,000.00 0.00 2021-06-18 2021-06-17 2021-07-15 2021-07-23 2021-07-31 2024-01-31 Implementation e Información nivel 2 Evaluation Selection Page 7 Projet de renforcement de l’alimentation en Eau Potable en milieu urbain (PREMU) Plan de passation des marchés – PART BAILLEUR I. GÉNÉRALITÉS 1.1. Information générale sur le projet Pays: République de Côte d’Ivoire Emprunteur : Gouvernement de Côte d’Ivoire Nom du Projet : Projet de renforcement de l’alimentation en Eau Potable en milieu urbain (PREMU) Numéros du crédit : IDA-59210-CI Montant du crédit : 50 millions $ US Financement Unité de Gestion: Cellule de Coordination du PRICI 1.2 Date d’approbation du plan original de passation de marchés : 13 octobre 2016 1.3 Date de publication de l’avis général de passation de marchés : 3 octobre 2017 1.4 Période couverte par le Plan de passation des marchés : d’octobre 2016 à mars 2018 1.5 Niveau de risque de passation des marchés du projet : modéré II. Fourniture, Travaux et Services Assimilés 2.1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions de l'Annexe 1 des Directives de passation de marchés de janvier 2011, révisé en juillet 2014 : Nouveaux seuils de revue de la Banque révisés en juillet 2016 et liés au niveau de risque du projet. Nature des Méthode de Valeur seuil Contrats soumis à dépenses passation de du marché examen préalable marchés $EU de l’IDA 1. Travaux AOI ≥ 10,000,000 (y compris clés en Tous les contrats de AON < 10,000,000 main, Fourniture et 15.000.000 $EU et Demande de cotation – < 200,000 plus montage au moins 3 offres d’installations et Entente Directe (*) Pas de seuil Contrats ≥ 100,000 PPP) 2. Fournitures, AOI ≥ 1,000,000 Systèmes AON < 1,000,000 d’Informations et Tous les contrats de Consultation de 4.000.000 $EU et Services autres Fournisseurs à l’échelle que les services de < 100,000 plus Nationale - Au moins 3 Consultants offres Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ Consultation de Fournisseurs à l’échelle Nationale - Au moins 3 < 500 000 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil Contrats ≥ 100,000 (*) Le justificatif de toute entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ 2.2. Marchés, planning et méthode de passation pour les Travaux - Fournitures et Services autres que les services de consultants Préfére Méth nce Ouverture Coût ode Exam. par Liste des ensembles de marchés Coût P-Q fournis plis estimé pass Banque Commen estimé en seurs prévue (millier ation locaux taire $EU de FCFA) Marc OUI/ OUI/NO A priori/A Date N° Description hés NON N posteriori prévue Composante A: Alimentation en eau 24 591 43 912 A Potable (AEP) des 118 710 centres Urbains Travaux de renforcement du système d'eau potable A 15/07/201 1 dans les villes de Tiassalé, 2 964 600 5 293 930 AON NON NON posteriori 7 N'DOUCI et Nzianoua (en 2 lots) Travaux de renforcement A 27/06/201 2 du système d'eau potable 5 549 479 9 909 780 AOI NON NON posteriori 7 dans la ville d'Agboville Travaux de renforcement du système d'eau potable 10 255 A 20/06/201 3 5 742 982 AOI NON NON dans les villes de Korhogo 330 posteriori 7 et Ferkessédougou Travaux de renforcement A 14/07/201 4 du système d'eau potable 2 522 750 4 504 910 AON NON NON posteriori 7 dans la ville de Béoumi Travaux de renforcement 10 387 A 16/08/201 5 du système d'eau potable 5 817 147 AOI NON NON 760 posteriori 7 dans la ville de Bingerville Travaux de renforcement du Système d’alimentation 1 775 A 15/08/201 6 994 000 AON NON NON électrique des centres de 000 posteriori 7 production en (5 lots) Acquisition de fournitures pour la réalisation de A 13/09/201 7 1 000 160 1 786 000 AOI NON NON 10 000 branchements posteriori 7 sociaux COMPOSANTE B : Appui institutionnel et B 208 900 373 040 renforcement des capacités Acquisition de matériels informatiques et A 01/08/201 8 bureautiques pour la 55 000 98 210 AON N/A N/A posteriori 7 cellule de coordination et l’ONEP Acquisition de matériels informatiques et A 01/08/201 9 bureautiques pour la 10 000 17 860 CFN N/A N/A posteriori 7 cellule de coordination et l’ONEP Acquisition de deux véhicules (1 pick up et 1 A 01/08/201 10 véhicule de type 4x4) pour 100 000 178 570 CFN N/A N/A posteriori 7 la cellule de coordination et l’ONEP Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ Achat de carburant pour la A 10/08/201 11 cellule de coordination et 25 000 44 640 CFN N/A N/A posteriori 7 l’ONEP Assurance de véhicules A 01/08/201 12 pour la cellule de 6 700 11 960 CFN N/A N/A posteriori 7 coordination et l’ONEP Assurance maladies pour A 17/01/201 13 la cellule de coordination 2 200 3 930 CFN N/A N/A posteriori 7 et l’ONEP Acquisition de fournitures A 10/01/201 14 de bureau pour la cellule 10 000 17 860 CFN N/A N/A posteriori 7 de coordination et l’ONEP 24 800 44 285 TOTAL 018,00 750 Taux de change utilisé: 1 $ EU= 560 F CFA III. Sélection de Consultants 3.1. Seuil d’examen préalable Les contrats qui seront soumis à l'examen préalable de la Banque conformément aux dispositions de l'Annexe 1 des Directives de Sélection et Emploi de Consultants de janvier 2011 révisées en juillet 2014, avec seuils révisés en juillet 2016 et liés au niveau de risque du projet : Nature de Méthode de passation de Valeur Contrats soumis à dépenses marchés seuil du examen préalable contrat $EU Consultant SFQC1, SFQ2, SMC3, SCBD4, ≥ 300.000 s Tout contrat de 2.000.000 Firmes SFQC, SFQ, SMC, SCBD, QC5 < 300.000 $EU ou plus Contrat ≥ 100,000 Entente directe (*) Pas de seuil Et Audit financier Consultant Consultant individuel (AMI) ≥ 100.000 Tout contrat de 400.000 $ s EU ou plus Individuels Consultant individuel (3 CV) < 100.000 Contrat ≥ 100,000 Entente directe (*) Et personnel permanent du Pas de seuil projet Tous les TDR, quelle que soit la valeur du contrat, sont soumis à examen préalable. (*) Le justificatif de toute sélection par entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 1 SFQC : Sélection Fondée sur la Qualité et le Coût 2 SFQ : Sélection fondée sur la qualité 3 SMC : Sélection au moindre coût 4 SCBD : Sélection dans le cadre d’un budget déterminé 5 QC : Sélection basée sur les Qualifications des Consultants CI : Consultant Individuel : AMI : Avis à Manifestation d’Intérêt Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ 3.2. Liste restreinte composée entièrement de Consultants Nationaux : Liste restreinte de consultants pour prestations de services, d’un coût estimatif inférieur à 300 000$ US ou équivalent par contrat, peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ 3.3. Marchés, planning et méthode de passation pour les Services de Consultants Nota – en italique : activités et marchés à spécifier ; les montants représentent des enveloppes budgétaires qui seront à allouer par activité spécifique et ne sont pas comptabilisés dans les totaux Coût estimé Coût Méthode Ouvertur Liste des ensembles de Exam. par Comment (milliers estimé passation e plis marchés Banque aire de en $EU Marchés prévue FCFA) A priori/A Date N° Description posteriori prévue COMPOSANTE A : Contrôle et 1 072 1 951 A Supervision des 617 000 travaux-Etudes Suivi et contrôle des travaux de renforcement du système d'eau 23/05/20 1 120 217 215 000 SFQC A posteriori potable dans les villes de 17 Tiassalé, N'DOUCI et N’zianoua Suivi et contrôle des travaux de renforcement 10/05/20 2 du système d'eau 200 000 357 000 SFQC A posteriori 17 potable dans la ville AGBOVILLE Suivi et contrôle des travaux de renforcement du système d'eau 19/05/20 3 200 000 357 000 SFQC A posteriori potable dans les villes de 17 Korhogo et Ferkessédougou Suivi et contrôle des travaux de renforcement 12/05/20 4 du système d'eau 120 000 214 000 SFQC A posteriori 17 potable dans la ville de Béoumi suivi et contrôle des travaux de renforcement du système d'eau 19/05/20 5 150 000 268 000 SFQC A posteriori potable dans la ville de 17 Bingerville et ses environs Recrutement d'un consultant pour la 17/01/20 7 réalisation d'études 282 400 504 000 SFQC A posteriori 18 techniques complémentaires Suivi et contrôle des travaux de renforcement du système 80 000 142 860 d’alimentation électrique des centres de production (5 lots) COMPOSANTE B : Appui institutionnel et 812 1 450 B renforcement des 400 710 capacités 722 1 290 B-1 Appui institutionnel 400 000 Recrutement d'un consultant pour l'audit 12/09/20 8 201 600 360 000 SFQC A posteriori technique des contrats et 17 conventions en cours Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ Recrutement d'un consultant pour l'appui à 9 369 600 660 000 SFQC A posteriori 15/06/17 l'inventaire des immobilisations Recrutement d'un 10 consultant pour l'appui à 151 200 270 000 SFQC A posteriori 15/03/18 la modélisation financière Renforcement des 302 540 B-2 capacités 400 000 Renforcement en gestion 100 800 180 000 financière Mise en œuvre de la Planification des 100 800 180 000 investissements et suivi évaluation Suivi de l'exploitation 100 800 180 000 B-3 Gestion du projet 90 000 160 710 Audit financier et comptable exercices 11/01/20 11 60 000 107 140 SFQC A PRIORI 2016, 2017, 2018 et 17 2019 Enquête de référence sur 04/07/20 12 la satisfaction des 30 000 53 570 3 CV A posteriori 17 services d’eau potable Appui à la sauvegarde 151 200 270 000 Audits techniques des 60 000 107 140 investissements du projet Audits environnemental 50 000 89 290 et social Sensibilisation éducation, communication et encadrement pour 40 000 71 430 engagement citoyen des bénéficiaires 1 885 3 365 TOTAL 017 710 Plan de passation des marchés simplifié révisé, septembre 2017 – ‘Cellule Marché PRICI/PREMU’ PROCUREMENT Cote d'Ivoire : Cote d'Ivoire Urban Water Supply and Sanitation Project PLAN General Information Country: Cote d'Ivoire Bank’s Approval Date of the Original Procurement Plan: 2017-10-03 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156739 GPN Date: Project Name: Cote d'Ivoire Urban Water Supply and Sanitation Project Loan / Credit No: IDA / 59210, IDA / 64520 Cote d'Ivoire - Emergency Infrastructure Renewal Project Implementation Unit Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PRICI-20886-CW-RFB / TRAVAUX DE RENFORCEMENT Pending Component A - Urban water Single Stage - One 2018-07- DU SYSTEME D'ALIMENTATION IDA / 59210 Post Request for Bids Open - National 0.00 Implementat 2017-11-13 2017-11-18 2017-12-18 2017-12-23 2018-01-27 supply Envelope 26 ELECTRIQUE DES CENTRES DE ion PRODUCTION CI-PRICI-20853-CW-RFB / TRAVAUX DE RENFORCEMENT DU SYSTEME D'EAU POTABLE Component A - Urban water Single Stage - One 10,073,978. 2018-10- IDA / 59210 Post Request for Bids Open - International Signed 2017-07-18 2017-04-18 2017-07-23 2017-09-06 2017-06-20 2017-09-11 2017-07-02 2017-10-14 2017-11-27 DANS LES VILLES DE supply Envelope 61 14 KORHOGO ET FERKESSEDOUGOU CI-PRICI-20857-CW-RFB / TRAVAUX DE RENFORCEMENT Component A - Urban water Single Stage - One 6,245,472.3 2018-10- IDA / 59210 Post Request for Bids Open - International Signed 2017-07-18 2017-07-07 2017-07-23 2017-09-06 2017-08-16 2017-09-11 2018-02-23 2017-10-16 2018-04-05 DU SYSTEME D'EAU POTABLE supply Envelope 2 16 DE VILLE DE BINGERVILLE CI-PRICI-20858-CW-RFB / TRAVAUX DE RENFORCEMENT Under Component A - Urban water Single Stage - One 2018-11- DU SYSTEME D'EAU POTABLE IDA / 59210 Post Request for Bids Open - National 0.00 Implementat 2017-07-18 2017-05-29 2017-07-19 2017-08-18 2017-07-13 2017-08-23 2017-07-22 2017-09-27 supply Envelope 02 DANS LES VILLES DE TIASSALE, ion N'DOUCI ET N'ZIANOUA CI-PRICI-20767-CW-RFB / TRAVAUX DE RENFORCEMENT Component A - Urban water Single Stage - One 8,877,845.8 2017-11- IDA / 59210 Post Request for Bids Open - International Signed 2017-07-18 2017-04-18 2017-07-23 2017-09-06 2017-07-27 2017-09-11 2017-07-08 2017-10-16 2017-11-23 EN EAU POTABLE DE LA VILLE supply Envelope 0 21 D'AGBOVILLE CI-PRICI-20879-CW-RFB / TRAVAUX DE RENFORCEMENT Component A - Urban water Single Stage - One 4,645,804.6 2018-11- IDA / 59210 Post Request for Bids Open - National Signed 2017-07-18 2017-06-13 2017-07-23 2017-08-22 2017-07-14 2017-08-25 2017-11-08 2017-09-29 2018-02-05 DU SYSTEME D'EAU POTABLE supply Envelope 7 23 DANS LA VILLE DE BEOUMI CI-PRICI-123483-CW-DIR / LA REALISATION D'UN RESEAU Component A - Urban water 2019-12- IDA / 59210 Post Direct Selection Direct 0.00 Canceled 2019-07-29 2019-08-03 2019-08-30 DE MOYENNE TENSION 15KV supply 28 A KORHOGO CI-PRICI-143367-CW-RFB / TRAVAUX DE RENFORCEMENT Pending DU SYSTEME D'ADDUCTION Component A - Urban water Single Stage - One 2021-10- IDA / 64520 Prior Request for Bids Open - International 0.00 Implementat 2020-01-20 2020-02-04 2020-03-20 2020-03-28 2020-04-30 D'EAU POTABLE DANS LES supply Envelope 30 ion VILLES DE DABOU (LOT 1) ET DE SONGON (2) CI-PRICI-143371-CW-RFB / TRAVAUX DE RENFORCEMENT DU SYSTEME D'ADDUCTION Pending Component A - Urban water Single Stage - One 2022-10- D'EAU POTABLE DANS LES IDA / 64520 Post Request for Bids Open - International 0.00 Implementat 2021-01-19 2021-02-04 2021-03-20 2021-03-28 2021-04-30 supply Envelope 30 VILLES DE ISSIA ET LOCALITE ion ENVIRONNANTES (LOT 1) ET DE NIAKARA ( LOT 2) CI-PRICI-143378-CW-RFB / Pending CONSTRUCTION D'UN SEUIL Component A - Urban water Single Stage - One 2021-12- IDA / 64520 Post Request for Bids Open - National 0.00 Implementat 2021-01-01 2021-01-21 2021-03-07 2021-03-15 2021-04-19 DEVERSOIR POUR LA supply Envelope 15 ion SECURISATION DE L'EXHAURE CI-PRICI-143395-CW-RFB / Pending TRAVAUX D'EXTENSION DES Component A - Urban water Single Stage - One 2023-01- IDA / 64520 Post Request for Bids Open - National 0.00 Implementat 2021-04-05 2021-04-10 2021-05-25 2021-06-02 2021-07-05 RESEAUX DE LA COMMUNE DE supply Envelope 04 ion KOUMASSI CI-PRICI-144414-CW-RFB / FOURNITURE ET Pending Component C - Urban Water Single Stage - One 2021-09- INSTALLATION DE 35 IDA / 64520 Post Request for Bids Open - International 0.00 Implementat 2020-01-08 2020-01-20 2020-03-05 2020-03-13 2020-03-27 Sector Strengthening Envelope 18 PLATEFORMES DE COLLECTE ion DE DONNÉES (PCD) CI-PRICI-144841-CW-RFB / Pending CONSTRUCTION DE BLOCS Component A - Urban water Single Stage - One 2022-07- IDA / 64520 Post Request for Bids Open - International 0.00 Implementat 2021-04-30 2021-05-15 2021-06-29 2021-07-07 2021-07-21 SANITAIRES DANS LES ECOLES supply Envelope 21 ion ET CENTRES DE SANTE CI-PRICI-143351-CW-RFB / TRAVAUX DE RENFORCEMENT DU SYSTEME D'ADDUCTION Component A - Urban water Single Stage - One 2021-09- IDA / 64520 Prior Request for Bids Open - International 0.00 Canceled 2019-11-26 2019-12-10 2020-01-24 2020-02-01 2020-03-05 D'EAU POTABLE DANS LES supply Envelope 04 VILLES DE TIASSALE, N'DOUCI ET SIKENSI CI-PRICI-143348-CW-RFB / TRAVAUX DE RENFORCEMENT DU SYSTEME D'ADDUCTION Component A - Urban water Single Stage - One 2021-03- D'EAU POTABLE DANS LES IDA / 64520 Prior Request for Bids Open - International 0.00 Canceled 2019-11-25 2019-12-10 2020-01-24 2020-02-01 2020-03-05 supply Envelope 05 VILLES DE KORHOGO ET FERKESSEDOUGOU ( LOT 1) ET DE BEOUMI (LOT2) Page 1 CI-PRICI-170044-CW-DIR / TRAVAUX DE RENFORCEMENT EN ALIMENTATION EN EAU Component A - Urban water 16,237,379. 2022-03- IDA / 64520 Prior Direct Selection Direct Signed 2020-05-18 2020-06-10 2020-05-23 2020-06-12 2020-08-05 2020-10-12 POTABLE DES VILLES DE supply 97 28 TIASSALE, N'DOUCI ET SIKENSI - PHASE 2 CI-PRICI-170048-CW-DIR / TRAVAUX DE RENFORCEMENT DE L'ALIMENTATION EN EAU Component A - Urban water 2021-09- IDA / 64520 Post Direct Selection Direct 0.00 Canceled 2020-05-19 2020-06-10 2020-05-24 2020-07-23 POTABLE DE LA VILLE DE supply 16 BEOUMI ET DES LOCALITES ENVIRONNANTES - PHASE 2 CI-PRICI-172881-CW-DIR / Travaux de renforcement du Component A - Urban water 16,005,119. 2022-03- système d'adduction d'eau IDA / 64520 Prior Direct Selection Direct Signed 2020-05-19 2020-06-05 2020-05-24 2020-06-11 2020-08-06 2020-09-23 supply 68 29 potable dans les villes de Korhogo et Ferkessédougou CI-PRICI-172884-CW-DIR / Travaux supplémentaires de Component A - Urban water 2020-10- renforcement du système IDA / 64520 Post Direct Selection Direct 0.00 Canceled 2020-05-19 2020-05-24 2020-07-23 supply 21 d'adduction d'eau potable de Béoumi (phase 1) CI-PRICI-172898-CW-RFB / Travaux de renforcement du Component A - Urban water Single Stage - One 2022-04- système d'adduction d'eau IDA / 64520 Post Request for Bids Open - National 0.00 Canceled 2020-05-26 2020-05-31 2020-06-30 2020-07-15 2020-08-28 supply Envelope 20 potable dans la ville de Bingerville (phase 2) CI-PRICI-172899-CW-RFB / Travaux de renforcement du Component A - Urban water Single Stage - One 2022-04- système d'adduction d'eau IDA / 64520 Post Request for Bids Open - National 0.00 Canceled 2020-05-26 2020-05-31 2020-06-30 2020-07-15 2020-08-28 supply Envelope 20 potable dans la ville d'Agboville CI-PRICI-186357-CW-RFB / TRAVAUX DE RENFORCEMENT Under Component A - Urban water Single Stage - One 18,129,193. 2022-01- DE L'ALIMENTATION EN EAU IDA / 64520 Prior Request for Bids Open - International Implementat 2020-07-31 2020-07-22 2020-08-05 2020-07-31 2020-09-19 2020-10-14 2020-10-04 2021-04-23 2020-11-08 supply Envelope 68 02 POTABLE DE LA VILLE DE ion BINGERVILLE – PHASE 2 CI-PRICI-186373-CW-RFB / TRAVAUX DE RENFORCEMENT DE L'ALIMENTATION EN EAU Under Component A - Urban water Single Stage - One 2022-01- POTABLE DE LA VILLE IDA / 64520 Post Request for Bids Open - International 0.00 Implementat 2020-07-31 2020-07-31 2020-08-05 2020-07-31 2020-09-19 2020-10-28 2020-10-04 2021-01-26 2020-11-08 supply Envelope 02 D’AGBOVILLE ET DES ion LOCALITES ENVIRONNANTES – PHASE 2 CI-PRICI-188780-CW-DIR / TRAVAUX DE RENFORCEMENT DE L'ALIMENTATION EN EAU Component A - Urban water 2021-11- POTABLE DES VILLES DE IDA / 64520 Post Direct Selection Direct 0.00 Canceled 2020-08-13 2020-08-18 2020-09-27 supply 21 BEOUMI, SAKASSOU, BODOKRO ET DES LOCALITES ENVIRONNANTES CI-PRICI-204417-CW-RFB / TRAVAUX D'EXTENSION DE Pending RESEAUX DANS LE CADRE DE Component A - Urban water Single Stage - One 2021-06- IDA / 64520 Post Request for Bids Limited 0.00 Implementat 2020-11-25 2020-11-30 2020-12-20 2020-12-25 2020-12-29 LA MISE EN OEUVRE DES supply Envelope 27 ion MESURES DE LUTTE CONTRE LE CORONA VIRUS CI-PRICI-213704-CW-RFB / TRAVAUX DE RENFORCEMENT DE L'ALIMENTATION EN EAU Under Component A - Urban water Single Stage - One 2022-04- POTABLE DES VILLES DE IDA / 64520 Post Request for Bids Open - National 0.00 Implementat 2021-01-26 2021-03-15 2021-01-31 2021-03-17 2021-03-27 2021-04-27 supply Envelope 27 BEOUMI, SAKASSOU, ion BODOKRO ET DES LOCALITES ENVIRONNANTES CI-PRICI-143363-CW-RFB / TRAVAUX DE RENFORCEMENT DU SYSTEME D'ADDUCTION Component A - Urban water Single Stage - One 2021-09- IDA / 64520 Prior Request for Bids Open - International 0.00 Canceled 2019-11-25 2019-12-10 2020-01-24 2020-02-01 2020-03-05 EN EAU POTABLE DANS LES supply Envelope 04 VILLES DE BINGERVILLE (LOT 1) ET D'AGBOVILLE (LOT 2) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PRICI-20900-GO-RFQ / Pending ASSURANCE DES VEHICULES Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 0.00 Implementati 2017-12-06 2018-01-01 2019-01-01 DE LA COORDINATION ET DE support Quotations Envelope on L'ONEP CI-PRICI-20901-GO-RFQ / Pending ASSURANCE MALADIES DES Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 0.00 Implementati 2017-07-29 2017-08-24 2018-02-20 AGENTS DE LA CELLULE DE support Quotations Envelope on COORDINATION ET DE L'ONEP CI-PRICI-39750-GO-RFQ / Pending ACQUISITION DE LOGICIELS Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 0.00 Implementati 2017-12-23 2018-01-17 2018-02-16 POUR LA CELLULE DE support Quotations Envelope on COORDINATION DU PREMU CI-PRICI-39751-GO-RFQ / ACQUISITION DE MOBILIERS Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 76,636.48 Signed 2017-12-12 2018-01-06 2017-09-18 2018-02-20 DE BUREAU POUR LA CELLULE support Quotations Envelope DE COORDINATION DU PREMU Page 2 CI-PRICI-20887-GO-RFB / ACQUISITION DE Under Component A - Urban water Single Stage - One FOURNITURES POUR LA IDA / 59210 Post Request for Bids Open - International 0.00 Implementati 2017-11-09 2017-11-17 2017-11-14 2017-12-29 2018-01-03 2018-02-07 2018-06-07 supply Envelope REALISATION DE 10 000 on BRANCHEMENTS SOCIAUX CI-PRICI-20903-GO-RFQ / ACQUISITION DE FOURNITURE Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 13,538.79 Signed 2017-11-25 2017-12-21 2017-12-06 2018-01-20 DE BUREAU POUR LA CELLULE support Quotations Envelope DE COORDINATION ET L'ONEP CI-PRICI-39748-GO-RFQ / ACQUISITION DE MATERIEL Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 0.00 Canceled 2017-12-22 2018-01-17 2018-04-17 D'ARCHIVAGE POUR LA support Quotations Envelope CELLULE DE COORDINATION CI-PRICI-62955-GO-RFQ / Pending ACQUISITION DU MATERIEL D Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 0.00 Implementati 2018-05-27 2018-06-22 2018-07-22 ARCHIVAGE POUR LA CELLULE support Quotations Envelope on DE COORDINATION CI-PRICI-62956-GO-RFQ / Pending ACQUISITION D'UN VEHICULE Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 0.00 Implementati 2018-05-23 2018-06-20 2018-08-04 DE TYPE VAN POUR LA support Quotations Envelope on CELLULE DE COORDINATION CI-PRICI-20890-GO-RFQ / ACQUISITION DE PETITS Component B - Institutional Request for Single Stage - One MATERIELS TECHNIQUES POUR IDA / 59210 Post Open - National 26,776.96 Signed 2017-11-14 2017-12-11 2017-10-18 2017-12-26 support Quotations Envelope LA CELLULE DE COORDINATION CI-PRICI-20896-GO-RFQ / ACQUISITION DE VEHICULES Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 148,875.54 Signed 2017-11-14 2017-12-12 2017-09-15 2018-01-26 2018-01-11 DE TYPE 4X4 ET PICK UP POUR support Quotations Envelope L'ONEP CI-PRICI-63231-GO-RFQ / Pending ACQUISITION D'UN VEHICULE Component B - Institutional Request for Single Stage - One IDA / 59210 Post Limited 0.00 Implementati 2018-03-07 2018-04-01 2018-05-01 DE TYPE 4X4 POUR LA support Quotations Envelope on CELLULE DE COORDINATION CI-PRICI-63235-GO-RFQ / ACQUISITION DE PETITS Component B - Institutional Request for Single Stage - One IDA / 59210 Post Limited 5,088.42 Completed 2017-10-10 2017-10-24 2017-11-01 2017-12-05 2017-11-16 2017-12-12 MATERIELS POUR LE COMPTE support Quotations Envelope DE L'ONEP CI-PRICI-87435-GO-RFB / SEMINAIRE POUR LA Pending RESTITUTION DU RAPPORT Component B - Institutional Single Stage - One IDA / 59210 Post Request for Bids Limited 0.00 Implementati 2018-11-22 2018-11-27 2018-11-28 2018-12-05 2018-12-08 2018-12-23 DIAGNOSTIC ET DU support Envelope on DESCRIPTIF DU MODELE FINANCIER PROVISOIRE CI-PRICI-143374-GO-RFB / ACQUISITION DE FOURNITURES POUR LA Component A - Urban water Single Stage - One REALISATION DE 31 000 IDA / 59210 Post Request for Bids Open - International 0.00 Canceled 2019-12-20 2020-01-20 2020-03-05 2020-03-10 2020-04-14 2020-10-11 supply Envelope BRANCHEMENTS SOCIAUX DES 9 CENTRES URBAINS ET LA ZONE SUD D'ABIDJAN CI-PRICI-143538-GO-RFB / Pending ACQUISITION DE MATERIEL Component A - Urban water Single Stage - One IDA / 64520 Prior Request for Bids Open - International 0.00 Implementati 2020-06-02 2020-06-18 2020-08-02 2020-08-10 2020-09-14 2021-03-13 POUR LA REHABILITATION DE supply Envelope on RESEAUX ET BRANCHEMENTS CI-PRICI-144839-GO-RFQ / Pending ACQUISITION DE DEUX Component D - Project Request for Single Stage - One IDA / 59210 Post Open - National 0.00 Implementati 2019-11-23 2019-12-21 2020-02-04 VÉHICULES POUR LA CELLULE management Quotations Envelope on DE COORDINATION CI-PRICI-143586-GO-RFQ / ACQUISITION DE DIX VEHICULES POUR LE COMPTE Component C - Urban Water Request for Single Stage - One IDA / 64520 Post Limited 0.00 Canceled 2019-11-06 2019-12-08 2020-03-07 DE LA CC-PREMU, DU MH Sector Strengthening Quotations Envelope DANS LE CADRE DES ACTIVITES DU PREMU CI-PRICI-148464-GO-RFQ / SEMINAIRE DE REVUE DES Pending Component D - Project Request for Single Stage - One DOSSIERS D'APPEL D'OFFRES IDA / 64520 Post Limited 0.00 Implementati 2019-12-09 2019-12-28 2020-01-01 management Quotations Envelope DES CENTRES INITIAUX DANS on LE CADRE DU PREMU-FA CI-PRICI-153314-GO-RFQ / ACQUISITION DE FOURNITURE Pending Component C - Urban Water Request for Single Stage - One DE BUREAU POUR LE COMPTE IDA / 64520 Post Open - National 0.00 Implementati 2020-01-11 2020-02-14 2020-03-15 Sector Strengthening Quotations Envelope DU MINISTERE DE on L'HYDRAULIQUE CI-PRICI-153315-GO-RFQ / Pending AMENANGEMENT DE BUREAU Component C - Urban Water Request for Single Stage - One IDA / 64520 Post Open - National 0.00 Implementati 2020-01-21 2020-02-24 2020-03-25 POUR LE COMPTE DU Sector Strengthening Quotations Envelope on MINISTERE DE L'HYDRAULIQUE CI-PRICI-153318-GO-RFQ / ACQUISITION DE MATERIELS Pending ET MOBILIERS DE BUREAU Component C - Urban Water Request for Single Stage - One IDA / 64520 Post Open - National 0.00 Implementati 2020-01-16 2020-02-21 2020-04-06 POUR LE MINISTERE DE Sector Strengthening Quotations Envelope on L'HYDRAULIQUE ET LE SERVICE HYDROLOGIE CI-PRICI-153319-GO-RFQ / ACQUISITION DE MATERIELS INFORMATIQUES POUR LE Pending Component C - Urban Water Request for Single Stage - One COMPTE DE LA CELLULE DE IDA / 64520 Post Open - National 0.00 Implementati 2020-01-16 2020-02-21 2020-04-06 Sector Strengthening Quotations Envelope COORDINATION, DU on MINISTERE DE L'HYDRAULIQUE ET DU SERVICE HYDROLOGIE Page 3 CI-PRICI-153321-GO-RFQ / ACQUISITION DE CONSOMMABLES Pending Component C - Urban Water Request for Single Stage - One INFORMATIQUES POUR LE IDA / 64520 Post Open - National 0.00 Implementati 2020-01-16 2020-02-21 2020-03-22 Sector Strengthening Quotations Envelope COMPTE DU MINISTERE DE on L'HYDRAULIQUE ET DU SERVICE DE L'HYDROLOGIE CI-PRICI-153322-GO-RFQ / Pending ACQUISITION D'INTERNET Component C - Urban Water Request for Single Stage - One IDA / 64520 Post Open - National 0.00 Implementati 2020-01-20 2020-02-23 2020-05-05 POUR LE COMPTE DU Sector Strengthening Quotations Envelope on MINISTERE DE L'HYDRAULIQUE CI-PRICI-161310-GO-RFQ / Implantation des ouvrages hydrauliques du Projet de Pending Renforcement du système Component D - Project Request for Single Stage - One IDA / 59210 Post Limited 0.00 Implementati 2020-03-07 2020-04-13 2020-05-13 d’adduction d’eau potable des management Quotations Envelope on villes de Tiassalé, N'Douci, Sikensi, Bingerville et d’Agboville – Phase 2 CI-PRICI-172897-GO-DIR / Fourniture et pose de Component A - Urban water branchement sociaux) et en IDA / 64520 Post Direct Selection Direct 2,498,147.37 Signed 2020-05-19 2020-06-29 2020-06-03 2020-05-15 2020-06-17 2020-09-23 2021-02-12 supply tranchée ouverte de canalisation en PVC CI-PRICI-172901-GO-RFQ / Acquisition de 15 camions citerne et motos dans le cadre Component A - Urban water Request for Single Stage - One IDA / 64520 Post Open - National 1,537,145.24 Signed 2020-05-20 2020-06-17 2020-12-28 2020-08-16 de la mise en oeuvre des supply Quotations Envelope mesures de luttre contre le corona virus CI-PRICI-182719-GO-RFQ / ACQUISITION DE DIX (10) Pending Component C - Urban Water Request for Single Stage - One VEHICULES DANS LE CADRE DE IDA / 59210 Post Limited 0.00 Implementati 2020-07-01 2020-08-02 2020-10-31 Sector Strengthening Quotations Envelope LA MISE EN OEUVRE DES on ACTIVITES DU PREMU CI-PRICI-190549-GO-RFQ / ATELIER SUR LE BILAN DE LA MISE EN ŒUVRE DU PLAN Pending Component C - Urban Water Request for Single Stage - One D’ACTIONS ET SON IDA / 64520 Post Limited 0.00 Implementati 2020-08-31 2020-09-20 2020-09-24 Sector Strengthening Quotations Envelope ACTUALISATION EN VUE DE on SON ADOPTION PAR LE MINISTERE DE L’HYDRAULIQUE CI-PRICI-203545-GO-RFQ / ACQUISITION DE MATÉRIELS Pending Component D - Project Request for Single Stage - One INFORMATIQUES ET IDA / 64520 Post Open - National 0.00 Implementati 2020-11-29 2020-12-25 2021-02-08 management Quotations Envelope BUREAUTIQUES POUR LA on CELLULE DE COORDINATION CI-PRICI-204414-GO-RFQ / ACQUISITION DE MOTOS Pending DANS LE CADRE DE LA MISE Component B - Institutional Request for Single Stage - One IDA / 64520 Post Limited 0.00 Implementati 2020-11-18 2020-12-10 2021-03-10 EN OEUVRE DES MESURES DE support Quotations Envelope on LUTTE CONTRE LE CORONA VIRUS CI-PRICI-204416-GO-RFQ / LOCATION DE VEHICULES Pending DANS LE CADRE DE MISE EN Component B - Institutional Request for Single Stage - One IDA / 64520 Post Limited 0.00 Implementati 2020-11-25 2020-12-17 2021-08-14 OEUVRE DES MESURES DE support Quotations Envelope on LUTTE CONTRE LE CORONA VIRUS CI-PRICI-204551-GO-DIR / Pending INSTALLATION ET MISE EN Component A - Urban water IDA / 64520 Post Direct Selection Direct 0.00 Implementati 2020-11-26 2020-12-01 2020-12-15 2021-08-12 SERVICE DES BRANCHEMENTS supply on SOCIAUX CI-PRICI-204554-GO-RFQ / ACQUISITION DE PRODUITS SANITAIRES (GELS Pending HYDROALCOOLIQUES, DES Component B - Institutional Request for Single Stage - One IDA / 64520 Post Limited 0.00 Implementati 2020-12-02 2020-12-28 2021-03-28 SAVONS LIQUIDES ...) DANS LE support Quotations Envelope on CADRE DE LA MISE EN OEUVRE DES MESURES DE LUTTE CONTRE LE CORONA VIRUS CI-PRICI-204557-GO-RFQ / ACQUISISTION DE MATERIELS COMMUNICATION Pending (KAKEMONO, CHASUBLES, Component B - Institutional Request for Single Stage - One IDA / 64520 Post Limited 0.00 Implementati 2020-12-01 2020-12-27 2021-03-27 MEGAPHONE...) DANS LE support Quotations Envelope on CADRE DE LA MISE EN OEUVRE DES MESURES DE LUTTE CONTRE LE CORONA VIRUS CI-PRICI-204621-GO-RFQ / ACQUISITION DE LOGICIELS Pending Component C - Urban Water Request for Single Stage - One METIERS DANS LE CADRE DE IDA / 64520 Post Limited 0.00 Implementati 2020-12-01 2020-12-26 2021-03-26 Sector Strengthening Quotations Envelope RENFORCEMENT DE on CAPACITES DE L'ONEP CI-PRICI-204623-GO-RFQ / ACQUISITION DE MATERIEL DE Pending GEOLOCALISATION ET DE Component C - Urban Water Request for Single Stage - One IDA / 64520 Post Limited 0.00 Implementati 2020-12-01 2020-12-24 2021-03-24 TABLETTES DANS LE CADRE Sector Strengthening Quotations Envelope on DU RENFORCEMENT DES CAPACITES DE L'ONEP CI-PRICI-204624-GO-RFQ / ACQUISITION DE SERVEUR Pending Component C - Urban Water Request for Single Stage - One DANS LE CADRE DU IDA / 64520 Post Limited 0.00 Implementati 2020-12-02 2020-12-25 2021-03-25 Sector Strengthening Quotations Envelope RENFORCEMENT DE on CAPACITES DE L'ONEP CI-PRICI-204633-GO-RFQ / ACQUISITION DE MATERIELS Component D - Project Request for Single Stage - One IDA / 64520 Post Limited 28,285.09 Signed 2020-11-17 2020-09-02 2021-01-12 2020-11-20 2021-04-12 INFORMATIQUES POUR LA management Quotations Envelope CELLULE DE COORDINATION Page 4 CI-PRICI-204625-GO-DIR / EXTENSION DU LOGICIEL Pending Component C - Urban Water CARTOGRAPHIQUE RESEAU IDA / 64520 Post Direct Selection Direct 0.00 Implementati 2020-12-24 2020-12-29 2021-01-14 2021-07-13 Sector Strengthening D'EAU ARC GIS UTILITY on NETWORK MANAGEMENT CI-PRICI-204627-GO-DIR / MISE A NIVEAU DES LOGICIELS Pending INFORM EAM ET Component C - Urban Water IDA / 64520 Post Direct Selection Direct 0.00 Implementati 2020-12-24 2020-12-29 2021-01-14 2021-07-13 MAINTENANCE DANS LE Sector Strengthening on CADRE DU RENFORCEMENT DES CAPACITES DE L'ONEP CI-PRICI-20899-GO-RFQ / ACHAT DE CARBURANT POUR Component B - Institutional Request for Single Stage - One IDA / 59210 Post Open - National 0.00 Canceled 2017-11-20 2017-12-16 2018-06-14 LA CELLULE DE support Quotations Envelope COORDINATION ET L'ONEP CI-PRICI-144786-GO-RFQ / Component C - Urban Water Request for Single Stage - One FOURNITURE D'EMBARCATION IDA / 64520 Post Open - National 0.00 Canceled 2019-11-29 2020-01-06 2020-04-05 Sector Strengthening Quotations Envelope ET ACCESSOIRES CI-PRICI-228013-GO-DIR / ACHAT DE CARBURANT DANS LE CADRE DE LA MISE EN Pending Component C - Urban Water ŒUVRE DES ACTIVITÉS DU IDA / 64520 Post Direct Selection Direct 0.00 Implementati 2021-04-12 2021-04-17 2021-04-27 2021-10-24 Sector Strengthening MINISTÈRE DE L'HYDRAULIQUE on ET DU SERVICE DE L'HYDROLOGIE CI-PRICI-236697-GO-RFQ / ACQUISITION DE VÉHICULES Pending POUR LES AGENCES Component B - Institutional Request for Single Stage - One IDA / 64520 Post Limited 0.00 Implementati 2021-06-01 2021-06-23 2021-09-21 D’EXÉCUTION DANS LE CADRE support Quotations Envelope on DE LA MISE EN ŒUVRE DES ACTIVITÉS DU PREMU-FA CI-PRICI-236698-GO-RFQ / ACQUISITION DE MATÉRIEL INFORMATIQUE POUR LES Pending Component B - Institutional Request for Single Stage - One AGENCES D’EXÉCUTION DANS IDA / 64520 Post Limited 0.00 Implementati 2021-06-13 2021-07-08 2021-08-07 support Quotations Envelope LE CADRE DE LA MISE EN on ŒUVRE DES ACTIVITÉS DU PREMU-FA CI-PRICI-236699-GO-RFQ / ACQUISITION DE MATÉRIELS BUREAUTIQUES ET Pending FOURNITURES DE BUREAU Component C - Urban Water Request for Single Stage - One IDA / 64520 Post Limited 0.00 Implementati 2021-06-13 2021-07-09 2021-08-08 POUR LES AGENCES Sector Strengthening Quotations Envelope on D’EXÉCUTION DANS LE CADRE DE L'EXECUTION DES ACTIVITÉS DU PREMU-FA NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PRICI-122138-NC-DIR / Pending MAINTENANCE DES VEHICULES Component D - Project IDA / 59210 Post Direct Selection 0.00 Implementati 2019-07-21 2019-07-26 2019-08-11 2021-07-31 ACQUIS DANS LE CADREDU management on PREMU CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PRICI-20942-CS-QCBS / SUIVI ET CONTRÔLE DES TRAVAUX DE RENFORCEMENT Component A - Urban water Quality And Cost- Under IDA / 59210 Post Open - National 0.00 2017-07-18 2017-02-07 2017-08-02 2017-09-04 2017-09-05 2017-09-10 2017-09-25 2017-10-10 2018-11-09 DU SYSTEME D'EAU POTABLE supply Based Selection Implementation DAN SLES VILLES DE TIASSALE, NDOUCI ET NZIANOUA CI-PRICI-20982-CS-QCBS / SUIVI ET CONTRÔLE DES Component A - Urban water Quality And Cost- Pending TRAVAUX DE RENFORCEMENT IDA / 59210 Post Open - National 0.00 2017-07-18 2017-08-02 2017-09-06 2017-09-08 2017-09-11 2017-09-30 2017-10-06 2018-11-05 supply Based Selection Implementation DU SYSTEME D'EAU POTABLE DANS LA VILLE DE BEOUMI CI-PRICI-20983-CS-QCBS / SUIVI ET CONTRÔLE DES TRAVAUX DE RENFORCEMENT Component A - Urban water Quality And Cost- Pending IDA / 59210 Post Open - National 0.00 2017-07-18 2017-08-02 2017-09-04 2017-09-06 2017-09-09 2017-09-24 2017-10-09 2018-11-08 DU SYSTEME D'EAU POTABLE supply Based Selection Implementation DANS LA VILLE DE BINGERVILLE ET SES ENVIRONS CI-PRICI-21277-CS-QCBS / ETUDE D'IMPACT PROJET (ENGAGEMENT CITOYEN, Component B - Institutional Quality And Cost- IDA / 59210 Post Open - National 0.00 Canceled 2017-07-24 2017-08-08 2017-08-14 2017-08-15 2017-08-20 2017-08-22 2017-08-26 2017-09-13 EVALUATION DES RESULTATS support Based Selection - ENQUETE AVANT ET APRES LE PROJET) CI-PRICI-20944-CS-QCBS / SUIVI ET CONTRÔLE DES Component A - Urban water Quality And Cost- TRAVAUX DE RENFORCEMENT IDA / 59210 Post Open - National 359,739.34 Signed 2017-07-18 2016-07-15 2017-08-02 2017-09-06 2017-04-10 2017-09-07 2017-05-10 2017-09-12 2017-05-12 2017-10-10 2017-07-23 2017-10-15 2017-10-12 2018-11-14 supply Based Selection DU SYSTEME EN EAU POTABLE DANS LA VILLE D'AGBOVILLE CI-PRICI-20981-CS-QCBS / SUIVI ET CONTRÔLE DES TRAVAUX DE RENFORCEMENT Component A - Urban water Quality And Cost- DU SYSTEME D'EAU POTABLE IDA / 59210 Post Open - National 322,786.35 Signed 2017-07-18 2016-06-15 2017-08-02 2017-09-04 2017-04-10 2017-09-06 2017-05-19 2017-09-09 2017-07-06 2017-09-25 2017-08-08 2017-10-12 2017-10-03 2018-11-11 supply Based Selection DANS LES VILLES DE KORHOGO ET DE FERKESSEDOUGOU Page 5 CI-PRICI-20984-CS-QCBS / RECRUTEMENT D'UN Component B - Institutional Quality And Cost- CONSULTANT POUR L'AUDIT IDA / 59210 Post Open - National 187,721.97 Signed 2017-07-25 2016-12-01 2017-08-09 2017-08-27 2017-09-05 2017-08-28 2017-09-11 2017-10-18 2017-09-26 2017-11-08 2017-10-11 2018-01-03 2018-04-09 support Based Selection TECHNIQUE DES CONTRATS ET CONVENTION EN COURS CI-PRICI-20988-CS-QCBS / RECRUTEMENT D'UN Component B - Institutional Quality And Cost- CONSULTANT POUR L'APPUI A IDA / 59210 Post Open - National 247,454.28 Completed 2017-07-18 2016-11-02 2017-11-09 2017-12-14 2017-09-21 2017-12-15 2017-11-10 2017-12-29 2017-11-28 2018-01-13 2017-11-28 2018-01-24 2018-01-03 2018-07-23 2018-09-03 support Based Selection L'INVENTAIRE DES IMMOBILISATIONS CI-PRICI-20989-CS-QCBS / RECRUTEMENT D'UN Component B - Institutional Quality And Cost- CONSULTANT POUR L'APPUI A IDA / 59210 Post Open - National 119,776.07 Signed 2018-01-16 2017-09-07 2018-01-31 2018-03-07 2017-09-05 2018-03-09 2018-03-23 2017-10-18 2018-04-07 2017-11-08 2018-04-22 2018-01-03 2018-10-19 support Based Selection LA MODELISATION FINANCIERE CI-PRICI-21274-CS-QCBS / AUDIT FINANCIER ET Component B - Institutional Quality And Cost- IDA / 59210 Prior Open - National 11,393.59 Signed 2017-07-24 2018-06-01 2017-08-08 2017-08-22 2017-08-23 2017-11-30 2017-08-28 2018-06-05 2017-09-21 2018-06-06 2017-09-25 2018-03-28 2020-07-31 COMPTABLE EXERCICE 2016, support Based Selection 2017, 2018 ET 2019 CI-PRICI-39746-CS-QCBS / Enquête de référence sur la Component B - Institutional Quality And Cost- IDA / 59210 Post Open - National 71,739.22 Signed 2017-12-07 2017-10-06 2017-12-22 2018-01-29 2018-01-08 2018-01-30 2018-02-22 2018-02-07 2018-03-13 2018-02-25 2018-04-23 2018-02-28 2018-04-13 2018-08-27 satisfaction des services d'eau support Based Selection potable CI-PRICI-21273-CS-QCBS / AUDIT TECHNIQUE A MI- Component B - Institutional Quality And Cost- Under IDA / 59210 Post Open - National 0.00 2018-05-17 2018-06-01 2018-06-01 2018-07-25 2018-07-06 2018-07-07 2018-07-17 2018-08-10 2018-08-14 2018-10-13 PARCOURS DES support Based Selection Implementation INVESTISSEMENTS DU PROJET CI-PRICI-106749-CS-CQS / CONSTAT D'IMPACT ENVIRONNEMENTAL ET Consultant SOCIAL(CIES) DU SOUS PROJET Component B - Institutional Pending IDA / 59210 Post Qualification Limited 0.00 2018-03-01 2018-03-15 2018-03-18 2018-03-21 2018-04-11 DE RENFORCEMENT DU support Implementation Selection SYSTEME D'ALIMENTATION EN EAU POTABLE (AEP) DANS LE CENTRE URBAIN D'AGBOVILLE CI-PRICI-106747-CS-CQS / CONSTAT D'IMPACT ENVIRONNEMENTAL ET SOCIAL(CIES) DU SOUS PROJET DE RENFORCEMENT DU Consultant Component B - Institutional Pending SYSTEME D'ALIMENTATION EN IDA / 59210 Post Qualification Limited 0.00 2018-03-01 2018-03-15 2018-03-18 2018-03-21 2018-04-11 support Implementation EAU POTABLE (AEP) DANS LE Selection CENTRE URBAIN DE BINGERVILLE DANS LE CADRE DE LA PREPARATION DU PREMU-FA CI-PRICI-106748-CS-CQS / CONSTAT D'IMPACT ENVIRONNEMENTAL ET SOCIAL(CIES) DU SOUS PROJET DE RENFORCEMENT DU Consultant Component B - Institutional Pending SYSTEME D'ALIMENTATION EN IDA / 59210 Post Qualification Limited 0.00 2015-12-15 2015-12-29 2016-01-01 2016-01-04 2016-01-25 support Implementation EAU POTABLE (AEP) DANS LE Selection CENTRE URBAIN DE TIASSALE /N'DOUCI/N'ZIANOUA DANS LE CADRE DE LA PREPARATION DU PREMU-FA CI-PRICI-115946-CS-QBS / APPUI A LA MISE EN OEUVRE DES ACTIVITES Component B - Institutional Quality Based Under IDA / 59210 Post Open - National 0.00 2019-05-27 2019-05-22 2019-06-11 2019-05-29 2019-07-19 2019-07-20 2019-07-28 2019-08-07 2019-08-10 2020-08-09 D'ENGAGEMENT CITOYEN DU support Selection Implementation PREMU A BEOUMI (ZONE CENTRE) CI-PRICI-115948-CS-QBS / APPUI A LA MISE EN ŒUVRE DES ACTIVITES D'ENGAGEMENT CITOYEN DU Component B - Institutional Quality Based Under IDA / 59210 Post Open - National 0.00 2019-05-27 2019-05-29 2019-06-11 2019-05-29 2019-07-19 2019-07-20 2019-07-28 2019-08-07 2019-08-10 2020-08-09 PREMU A AGBOVILLE, support Selection Implementation BINGERVILLE, TIASSALE, N'DOUCI ET N'ZIANOUAN (ZONE SUD) CI-PRICI-115952-CS-QBS / APPUI A LA MISE EN ŒUVRE DES ACTIVITES Component B - Institutional Quality Based Under D'ENGAGEMENT CITOYEN DU IDA / 59210 Post Open - National 0.00 2019-05-27 2019-05-29 2019-06-11 2019-05-29 2019-07-19 2019-07-20 2019-07-28 2019-08-07 2019-08-10 2020-08-09 support Selection Implementation PREMU A KORHOGO ET FERKESSEDOUGOU (ZONE NORD) CI-PRICI-122143-CS-CQS / SUIVI ET CONTRÔLE DES Consultant Component A - Urban water TRAVAUX D'ELECTRICITE DES IDA / 59210 Post Qualification Limited 0.00 Canceled 2019-07-16 2019-07-26 2019-08-05 2019-08-09 2019-12-07 supply VILLES DE TIASSALE, N'DOUCI Selection ET N'ZIANNOUA CI-PRICI-143597-CS-QCBS / SUIVI ET CONTROLE DES TRAVAUX D'ADDUCTION EN Component A - Urban water Quality And Cost- Under EAU POTABLE DES VILLES DE IDA / 64520 Post Open - International 0.00 2019-11-05 2020-01-23 2019-11-19 2020-02-04 2019-12-24 2020-05-06 2019-12-25 2020-10-21 2020-01-29 2020-10-15 2020-02-18 2021-01-05 2020-03-05 2021-03-05 supply Based Selection Implementation KORHOGO ET FERKESSEDOUGOU ET LOCALITES ENVIRONNANTES CI-PRICI-143612-CS-QCBS / SUIVI ET CONTRÔLE DES Component A - Urban water Quality And Cost- Under TRAVAUX D'ADDUCTION EN IDA / 64520 Post Open - International 0.00 2019-11-01 2020-01-07 2019-11-16 2020-02-04 2020-01-08 2020-12-01 2020-01-10 2020-10-22 2020-01-18 2020-12-01 2020-02-07 2020-12-10 2020-02-21 2021-10-13 supply Based Selection Implementation EAU POTABLE DE BEOUMI ET LOCALITES ENVIRONNANTES CI-PRICI-143811-CS-QCBS / SUIVI ET CONTROLE DES Component A - Urban water Quality And Cost- Pending TRAVAUX D'ADDUCTION EN IDA / 64520 Post Open - International 0.00 2021-02-01 2021-02-16 2021-04-10 2021-04-12 2021-04-20 2021-05-10 2021-05-24 2023-01-14 supply Based Selection Implementation EAU POTABLE DES VILLES DE DABOU ET SONGON Page 6 CI-PRICI-144149-CS-QBS / Component A - Urban water Quality Based Under ETUDE TECHNIQUE DU SEUIL IDA / 64520 Post Open - National 0.00 2019-11-26 2019-12-05 2019-12-10 2020-01-16 2019-12-30 2020-05-06 2020-02-13 2020-10-30 2020-02-21 2020-12-18 2020-03-04 2021-01-20 2020-03-11 2020-11-06 supply Selection Implementation DE KORHOGO CI-PRICI-144400-CS-QBS / ETUDE DE LA VULNERABILITE Component A - Urban water Quality Based Under DE LA NAPPE D'ABIDJAN AUX IDA / 64520 Post Open - International 0.00 2020-01-22 2020-04-21 2020-02-17 2020-05-14 2020-04-01 2020-04-29 2020-05-29 2020-06-28 2020-07-14 2021-07-14 supply Selection Implementation ACTIVITES D'EXTRACTION DE SABLIERE DE LAGUNE CI-PRICI-144401-CS-QBS / ETUDES D'EVALUATION DES Component A - Urban water Quality Based Under IDA / 64520 Post Open - International 0.00 2020-01-30 2020-04-17 2020-02-14 2020-05-07 2020-04-07 2020-05-05 2020-06-04 2020-06-12 2020-06-26 2021-06-26 NAPPES AQUIFERES DE DABOU supply Selection Implementation ET NIEKY CI-PRICI-144403-CS-QCBS / SUIVI ET CONTROLE DES TRAVAUX D'ADDUCTION EN Component A - Urban water Quality And Cost- Pending IDA / 64520 Post Open - International 0.00 2020-11-27 2020-12-12 2020-12-25 2020-12-26 2021-01-03 2021-01-23 2021-02-06 2022-09-29 EAU POTABLE DES VILLES DE supply Based Selection Implementation NIAKARA, D'ISSIA ET LOCALITES ENVIRONNANTES CI-PRICI-144405-CS-QCBS / SUIVI ET CONTROLE DES Component A - Urban water Quality And Cost- Pending TRAVAUX D'EXTENSIONS DE IDA / 64520 Post Open - International 0.00 2020-11-30 2020-12-14 2020-12-27 2020-12-28 2021-01-05 2021-01-25 2021-02-08 2022-10-01 supply Based Selection Implementation RESEAUX DE LA COMMUNE DE KOUMASSI CI-PRICI-144407-CS-QBS / MODELISATION Component C - Urban Water Quality Based Pending IDA / 64520 Post Open - National 0.00 2020-05-21 2020-06-05 2020-07-28 2020-07-30 2020-08-07 2020-08-15 2020-08-29 2021-08-29 HYDROLOGIQUE D'UN BASSIN Sector Strengthening Selection Implementation VERSANT CI-PRICI-144408-CS-QBS / APPUI AL'ELABORATION DU PLAN STRATEGIQUE POUR LES Component C - Urban Water Quality Based ODD 6 ET A LA VALIDATION IDA / 64520 Post Open - International 369,141.95 Signed 2020-02-20 2020-01-07 2020-03-06 2020-01-16 2020-04-28 2020-08-31 2020-04-29 2020-11-25 2020-05-07 2020-12-29 2020-05-15 2021-01-20 2020-05-29 2021-04-01 2020-11-25 Sector Strengthening Selection ET A L'ADOPTION D'UNE LETTRE DE POLITIQUE SECTORIELLE CI-PRICI-144411-CS-QBS / APPUI A L’ÉLABORATION DU Component C - Urban Water Quality Based Pending IDA / 64520 Post Open - National 0.00 2020-02-20 2020-03-06 2020-04-28 2020-04-29 2020-05-07 2020-05-15 2020-05-29 2021-01-24 PROCHAIN CONTRAT Sector Strengthening Selection Implementation D'AFFERMAGE CI-PRICI-144412-CS-QBS / APPUI AU RENFORCEMENT DE L'ONEP POUR L'ACTUALISATION DE Component C - Urban Water Quality Based Pending L'INVENTAIRE DES RÉSEAUX , IDA / 64520 Post Open - International 0.00 2020-03-18 2020-04-02 2020-05-25 2020-05-27 2020-06-04 2020-06-12 2020-06-26 2020-12-23 Sector Strengthening Selection Implementation LE SUIVI DE LA QUALITÉ DE L'EAU, DE LA RÉGULATION DU CONTRAT D'AFFERMAGE ET LA GESTION DU DU PATRIMOINE CI-PRICI-144413-CS-QBS / ETUDE DIAGNOSTIQUE DES Component C - Urban Water Quality Based PERTES EN EAUX ET TRAVAUX IDA / 64520 Prior Open - International 0.00 Under Review 2020-02-04 2020-01-07 2020-02-24 2020-02-21 2020-04-17 2020-08-26 2020-04-19 2020-04-27 2020-05-05 2020-05-19 2021-11-10 Sector Strengthening Selection DE SECTORISATION A KOUMASSI CI-PRICI-144415-CS-QCBS / ETUDES DU SCHEMA Component A - Urban water Quality And Cost- Pending DIRECTEUR D'ADDUCTION EN IDA / 64520 Post Open - International 0.00 2019-12-11 2019-12-30 2020-02-21 2020-02-22 2020-03-01 2020-03-23 2020-04-21 2020-12-17 supply Based Selection Implementation EAU POTABLE D'ABIDJAN A L'HORIZON 2035 CI-PRICI-144417-CS-QCBS / ETUDES TECHNIQUES POUR Component A - Urban water Quality And Cost- Pending LES EXTENSIONS DE RÉSEAUX IDA / 64520 Post Open - International 0.00 2020-04-22 2020-05-07 2020-06-29 2020-06-30 2020-07-08 2020-07-30 2020-08-15 2021-04-12 supply Based Selection Implementation DE LA COMMUNE DE KOUMASSI CI-PRICI-144603-CS-QCBS / ETUDES D’ÉVALUATION ET DE MOBILISATION EN EAU DES VILLES DE VAVOUA ET Component A - Urban water Quality And Cost- Under ZUENOULA ET ETUDES IDA / 64520 Post Open - International 0.00 2019-11-26 2020-01-28 2019-12-11 2020-04-14 2020-02-06 2020-02-07 2020-02-15 2020-02-24 2020-03-11 2020-09-07 supply Based Selection Implementation TECHNIQUES APD D'ADDUCTION D'EAU POTABLE DES VILLES DE VAVOUA, ZUENOULA ET ISSIA CI-PRICI-144604-CS-QCBS / ETUDES TECHNIQUES Component A - Urban water Quality And Cost- D'ADDUCTION D'EAU POTABLE IDA / 64520 Post Open - International 391,175.12 Signed 2019-11-20 2020-01-28 2019-12-05 2020-04-14 2020-01-31 2020-07-21 2020-02-01 2020-11-10 2020-02-09 2020-12-10 2020-02-18 2021-01-05 2020-03-05 2021-03-08 2020-09-01 supply Based Selection DES VILLES DE NIAKARA ET PRIKRO CI-PRICI-144606-CS-QCBS / ETUDES ENVIRONNEMENTALES Component A - Urban water Quality And Cost- Pending IDA / 64520 Post Open - National 0.00 2019-11-29 2019-12-14 2020-02-05 2020-02-06 2020-02-14 2020-02-20 2020-03-05 2020-09-01 DES VILLES DE SONGON ET supply Based Selection Implementation DABOU CI-PRICI-144616-CS-QCBS / ETUDES ENVIRONNEMENTALES Component A - Urban water Quality And Cost- Pending IDA / 64520 Post Open - National 0.00 2019-11-28 2019-12-17 2020-02-08 2020-02-09 2020-02-17 2020-02-23 2020-03-08 2020-09-04 DES VILLES DE VAVOUA, supply Based Selection Implementation ZUENOULA ET ISSIA CI-PRICI-144619-CS-QCBS / ETUDES ENVIRONNEMENTALES Component A - Urban water Quality And Cost- Under IDA / 64520 Post Open - National 0.00 2019-11-29 2020-02-03 2019-12-17 2020-02-08 2020-02-09 2020-02-17 2020-02-23 2020-03-08 2020-09-04 DES VILLES DE NIAKARA ET supply Based Selection Implementation PRIKRO CI-PRICI-144621-CS-QBS / STRATÉGIE ET POLITIQUE Component B - Institutional Quality Based Under NATIONALE DE IDA / 64520 Post Open - International 0.00 2020-02-13 2021-03-02 2020-02-28 2021-04-09 2020-04-21 2020-04-22 2020-04-30 2020-05-08 2020-05-24 2021-11-15 support Selection Implementation L'ASSAINISSEMENT ET DU DRAINAGE CI-PRICI-144634-CS-QBS / Component B - Institutional Quality Based Pending CAMPAGNE DE IDA / 64520 Post Open - International 0.00 2021-08-23 2021-09-07 2021-10-30 2021-10-31 2021-11-08 2021-11-16 2021-12-02 2022-05-31 support Selection Implementation SENSIBILISATION A L'HYGIENE Page 7 CI-PRICI-144643-CS-QBS / ETUDES SCHEMA DIRECTEUR D'ASSAINISSEMENT ET DE Component B - Institutional Quality Based Under IDA / 64520 Post Open - International 0.00 2019-12-27 2020-04-28 2020-01-15 2020-03-08 2020-03-09 2020-03-17 2020-03-25 2020-04-10 2020-10-07 DRAINAGE DE TIASSALE, support Selection Implementation N'DOUCI, SIKENSI, D'AGBOVILLE ET DE DABOU CI-PRICI-144772-CS-QBS / ETUDE DU SCHÉMA Component B - Institutional Quality Based Under DIRECTEUR D'ASSAINISSEMENT IDA / 64520 Post Open - International 0.00 2019-12-30 2020-04-28 2020-01-15 2020-03-08 2020-03-09 2020-03-17 2020-03-25 2020-04-10 2020-10-07 support Selection Implementation ET DE DRAINAGE DES VILLES D'ISSIA ET DE BEOUMI CI-PRICI-144773-CS-QCBS / SUIVI ET CONTRÔLE DES TRAVAUX DE CONSTRUCTION Component B - Institutional Quality And Cost- Pending IDA / 64520 Post Open - International 0.00 2021-01-15 2021-02-02 2021-03-27 2021-03-29 2021-04-06 2021-04-26 2021-05-10 2021-07-12 DE BLOCS SANITAIRES DANS support Based Selection Implementation LES ECOLES ET LES CENTRES DE SANTE CI-PRICI-144778-CS-QCBS / ETUDES ENVIRONNEMENTALES Component B - Institutional Quality And Cost- Pending IDA / 64520 Post Open - National 0.00 2019-11-29 2019-12-20 2020-02-11 2020-02-12 2020-02-20 2020-02-29 2020-03-16 2020-07-14 ET SOCIALES DES BLOCS support Based Selection Implementation SANITAIRES CI-PRICI-144779-CS-QCBS / ETUDES SUR LE MODE DE GESTION PÉRENNE DES Component B - Institutional Quality And Cost- Pending IDA / 64520 Post Open - International 0.00 2020-06-23 2020-07-08 2020-11-15 2020-11-16 2020-11-24 2020-12-03 2020-12-17 2021-07-04 INSTALLATIONS SANITAIRES support Based Selection Implementation DES ECOLES ET CENTRES DE SANTE CI-PRICI-143611-CS-QCBS / SUIVI ET CONTRÔLE DES TRAVAUX D'ADDUCTION Component A - Urban water Quality And Cost- Under IDA / 64520 Post Open - International 0.00 2020-01-07 2020-01-14 2020-01-22 2020-02-18 2020-03-15 2020-06-09 2020-03-17 2020-10-23 2020-03-25 2020-12-18 2020-04-14 2021-01-05 2020-04-28 2022-09-15 D'EAU POTABLE DE supply Based Selection Implementation BINGERVILLE ET LOCALITES ENVIRONNANTES CI-PRICI-143590-CS-QCBS / SUIVI ET CONTRÔLE DES TRAVAUX D'ADDUCTION EN Component A - Urban water Quality And Cost- IDA / 64520 Post Open - International 515,846.71 Signed 2020-01-07 2020-01-14 2020-02-06 2020-02-18 2020-02-19 2020-05-06 2020-04-04 2020-10-20 2020-04-12 2020-10-20 2020-04-21 2020-10-20 2020-05-05 2021-02-19 2021-12-26 EAU POTABLE DE supply Based Selection TIASSALE/N'DOUCI/SIKENSI ET LOCALITES ENVIRONNANTES CI-PRICI-153021-CS-QCBS / Suivi et Contrôle des Travaux de Renforcement du système Component A - Urban water Quality And Cost- Under IDA / 64520 Post Open - International 0.00 2020-01-07 2020-01-14 2020-02-06 2020-02-18 2020-02-19 2020-06-09 2020-04-04 2020-11-12 2020-04-12 2020-12-18 2020-04-21 2021-01-05 2020-05-10 2022-07-29 d’adduction d’eau potable de supply Based Selection Implementation la ville d’Agboville et des localités environnantes CI-PRICI-158010-CS-QCBS / RENFORCEMENT DES CAPACITÉS DE L’OFFICE NATIONAL DE L’EAU POTABLE AU TITRE DE POUR LA Component C - Urban Water Quality And Cost- IDA / 59210 Post Open - National 0.00 Under Review 2020-02-19 2020-02-11 2020-03-11 2020-04-18 2020-04-19 2020-04-27 2020-05-16 2020-06-01 2020-11-28 PLANIFICATION, LA MISE EN Sector Strengthening Based Selection ŒUVRE ET LE SUIVI ET L’ÉVALUATION DES INVESTISSEMENTS DU SECTEUR CI-PRICI-158011-CS-QCBS / RENFORCEMENT DES CAPACITÉS DE L’OFFICE Component C - Urban Water Quality And Cost- NATIONAL DE L’EAU POTABLE IDA / 59210 Post Open - National 0.00 Under Review 2020-02-20 2020-02-11 2020-03-12 2020-04-19 2020-04-20 2020-04-28 2020-05-17 2020-06-02 2020-06-20 Sector Strengthening Based Selection AU TITRE DU SUIVI DE L'EXPLOITATION DU SERVICE PUBLIC D’EAU POTABLE CI-PRICI-164224-CS-QCBS / AUDIT FINANCIER ET COMPTABLE DES COMPTES DU Component D - Project Quality And Cost- Under IDA / 64520 Post Open - National 0.00 2020-03-25 2020-04-08 2020-04-02 2020-05-06 2020-05-14 2021-01-20 2020-05-15 2020-05-20 2020-06-04 2020-06-08 2023-04-14 PROJET PREMU et PREMU FA management Based Selection Implementation DES EXERCICES 2020, 2021 ET 2022 CI-PRICI-185909-CS-QBS / ETUDE DE LA QUALITÉ DES EAUX BRUTES ET ÉVALUATION ENVIRONNEMENTALE DE HUIT (8) RETENUES D'EAUX DES Component C - Urban Water Quality Based Under IDA / 64520 Post Open - National 0.00 2020-07-30 2020-07-29 2020-08-29 2020-09-18 2020-12-01 2020-11-02 2021-03-15 2020-11-10 2021-03-26 2020-11-22 2020-11-29 2021-06-17 BARRAGES DESTINES A Sector Strengthening Selection Implementation L'ALIMENTATION EN EAU POTABLE DES POPULATIONS DE LA ZONE CENTRE DE LA COTE D'IVOIRE CI-PRICI-185919-CS-QBS / ETUDES D’AVANT-PROJET DETAILLE (APD) DE LA QUALITE DES EAUX BRUTES ET DE L’EVALUATION ENVIRONNEMENTALE DES Component C - Urban Water Quality Based Under IDA / 64520 Post Open - National 0.00 2020-07-31 2020-07-29 2020-08-30 2020-09-19 2021-01-22 2020-11-03 2021-03-15 2020-11-11 2020-11-23 2020-11-30 2021-06-18 NEUF (09) RETENUES D’EAU Sector Strengthening Selection Implementation DES BARRAGES ET SEUILS DESTINES A L’ALIMENTATION EN EAU POTABLE DES POPULATIONS DE LA ZONE EST DE LA COTE D’IVOIRE CI-PRICI-185920-CS-QBS / ETUDES D’AVANT-PROJET DETAILLE (APD) DE LA QUALITE DES EAUX BRUTES ET DE L’EVALUATION ENVIRONNEMENTALE DES Component C - Urban Water Quality Based Under IDA / 64520 Post Open - National 0.00 2020-07-31 2020-07-29 2020-08-30 2020-09-19 2020-12-01 2020-11-03 2021-03-15 2020-11-11 2021-03-27 2020-11-23 2020-11-30 2021-06-18 RETENUES D’EAU DES DIX (10) Sector Strengthening Selection Implementation BARRAGES ET SEUILS DESTINES A L’ALIMENTATION EN EAU POTABLE DES POPULATIONS DE LA ZONE NORD DE LA COTE D’IVOIRE Page 8 CI-PRICI-185921-CS-QBS / ETUDES D’AVANT-PROJET DETAILLE (APD) DE LA QUALITE DES EAUX BRUTES ET DE L’EVALUATION ENVIRONNEMENTALE DES Component C - Urban Water Quality Based Under IDA / 64520 Post Open - National 0.00 2020-08-04 2020-07-29 2020-09-03 2020-11-02 2020-12-01 2020-11-04 2021-03-15 2020-11-19 2021-03-27 2020-12-04 2020-12-20 2021-07-08 HUIT (08) RETENUES D’EAU Sector Strengthening Selection Implementation DES BARRAGES ET SEUILS DESTINES A L’ALIMENTATION EN EAU POTABLE DES POPULATIONS DE LA ZONE OUEST DE LA COTE D’IVOIRE CI-PRICI-204304-CS-QBS / RENFORCEMENT DU SYSTEME D’INFORMATION Component C - Urban Water Quality Based Under IDA / 64520 Post Open - International 0.00 2020-11-17 2020-12-04 2020-12-07 2021-01-12 2021-01-29 2021-01-30 2021-02-07 2021-02-15 2021-03-01 2023-03-21 HYDROMETRIQUE PAR LA Sector Strengthening Selection Implementation CREATION DE 35 STATIONS PCD CI-PRICI-204629-CS-QCBS / NUMERISATION, Component C - Urban Water Quality And Cost- Pending DIGITALISATION DES PLANS IDA / 64520 Post Open - National 0.00 2020-12-02 2020-12-23 2021-02-16 2021-02-18 2021-02-26 2021-03-14 2021-03-18 2021-10-04 Sector Strengthening Based Selection Implementation DE RESEAU ET DATABASE DES ZONES SUD, SUD-EST ET EST CI-PRICI-204631-CS-QCBS / NUMERISATION ET DIGITALISATION DES PLAN DE RESEAU / GEODATABASE Component C - Urban Water Quality And Cost- Under IDA / 64520 Post Open - National 0.00 2020-12-03 2020-11-26 2020-12-24 2021-02-17 2021-02-19 2021-02-27 2021-03-15 2021-03-19 2021-10-05 DANS LES ZONES CENTRE ET Sector Strengthening Based Selection Implementation NORDDANS LE CADRE DU RENFORCEMENT DE CAPACITES DE L'ONEP CI-PRICI-204632-CS-QCBS / NUMERISATION ET DIGITALISATION DES PLAN DE Component C - Urban Water Quality And Cost- Pending RESEAU / GEODATABASE IDA / 64520 Post Open - National 0.00 2020-12-03 2020-12-24 2021-02-17 2021-02-19 2021-02-27 2021-03-15 2021-03-19 2021-10-05 Sector Strengthening Based Selection Implementation DANS LA ZONE OUEST DANS LE CADRE DU RENFORCEMENT DES CAPACITES DE L'ONEP CI-PRICI-217391-CS-QBS / ÉLABORATION D’UN Component C - Urban Water Quality Based Under DIAGNOSTIC ET D’UNE IDA / 64520 Post Open - International 0.00 2021-02-09 2021-02-24 2021-04-18 2021-04-19 2021-04-27 2021-05-12 2021-05-29 2022-11-20 Sector Strengthening Selection Implementation STRATÉGIE DE RÉDUCTION DE L’EAU NON FACTURÉE CI-PRICI-219310-CS-CQS / ACCOMPAGNEMENT ET LE Consultant SUIVI DE LA MISE EN ŒUVRE Component A - Urban water Under IDA / 64520 Post Qualification Limited 0.00 2021-02-17 2021-02-15 2021-03-03 2021-03-06 2021-03-10 2021-09-06 DU PLAN DE RIPOSTE DU supply Implementation Selection SECTEUR EAU ET ASSAINISSEMENT AU COVID19 CI-PRICI-221014-CS-QCBS / ETUDES D’AVANT-PROJET DETAILLE (APD) POUR LE RENFORCEMENT DE Component A - Urban water Quality And Cost- Under IDA / 64520 Post Open - National 0.00 2021-02-26 2021-03-15 2021-03-19 2021-04-01 2021-05-11 2021-05-12 2021-05-20 2021-06-08 2021-06-14 2021-12-31 L’ALIMENTATION EN EAU supply Based Selection Implementation POTABLE DES VILLES DE PRIKRO ET DES LOCALITES ENVIRONNANTES CI-PRICI-223770-CS-QBS / ÉTUDE DU SCHÉMA DIRECTEUR POUR Component C - Urban Water Quality Based Under IDA / 64520 Post Open - International 0.00 2021-03-16 2021-03-15 2021-03-31 2021-05-23 2021-05-24 2021-06-01 2021-06-16 2021-07-03 2022-07-03 L'ALIMENTATION EN EAU Sector Strengthening Selection Implementation POTABLE DU GRAND ABIDJAN A L'HORIZON 2045 CI-PRICI-144418-CS-QCBS / ETUDES TECHNIQUES Component A - Urban water Quality And Cost- D'ADDUCTION EN EAU IDA / 64520 Post Open - International 0.00 Canceled 2019-11-27 2020-01-28 2019-12-12 2020-04-14 2020-02-07 2020-02-08 2020-02-16 2020-02-25 2020-03-12 2020-09-08 supply Based Selection POTABLES DES VILLES DE SONGON ET DABOU CI-PRICI-144370-CS-QBS / ETUDE DE LA QUALITÉ DES EAUX BRUTES ET ÉVALUATION ENVIRONNEMENTALE DE 36 RETENUES EN RELATION AVEC Component A - Urban water Quality Based LES ETUDES DU BILAN IDA / 64520 Post Open - National 0.00 Canceled 2020-01-29 2020-02-13 2020-03-04 2020-04-18 2020-04-26 2020-05-08 2020-05-15 2021-05-15 supply Selection DIAGNOSTIC DES DIGUES ET DES RETENUES D'EAU DES BARRAGES DESTINES A L'ALIMENTATION EN EAU POTABLE CI-PRICI-228910-CS-QCBS / EVALUATION ENVIRONNEMENTALE ET SOCIALE STRATEGIQUE (EESS) Component B - Institutional Quality And Cost- Under IDA / 64520 Post Open - International 0.00 2021-04-26 2021-04-15 2021-05-17 2021-05-06 2021-07-11 2021-07-13 2021-07-23 2021-07-27 2021-08-08 2022-02-04 DU SCHÉMA DIRECTEUR support Based Selection Implementation D’ASSAINISSEMENT ET DE DRAINAGE DE LA VILLE DE DABOU CI-PRICI-228912-CS-QCBS / EVALUATION ENVIRONNEMENTALE ET SOCIALE STRATEGIQUE (EESS) Component B - Institutional Quality And Cost- Under IDA / 64520 Post Open - International 0.00 2021-04-26 2021-04-15 2021-05-17 2021-05-06 2021-07-11 2021-07-13 2021-07-23 2021-07-27 2021-08-08 2022-02-04 DU SCHEMA DIRECTEUR support Based Selection Implementation D’ASSAINISSEMENT ET DE DRAINAGE DE LA VILLE DE BEOUMI CI-PRICI-228913-CS-QCBS / EVALUATION ENVIRONNEMENTALE ET Component B - Institutional Quality And Cost- Under SOCIALE STRATEGIQUE (EESS) IDA / 64520 Post Open - International 0.00 2021-04-26 2021-04-15 2021-05-17 2021-05-06 2021-07-11 2021-07-13 2021-07-23 2021-07-27 2021-08-08 2022-02-04 support Based Selection Implementation DU SCHEMA DIRECTEUR D’ASSAINISSEMENT ET DE DRAINAGE DE LA VILLE D’ISSIA Page 9 CI-PRICI-228914-CS-QCBS / EVALUATION ENVIRONNEMENTALE ET SOCIALE STRATEGIQUE (EESS) Component B - Institutional Quality And Cost- Under IDA / 64520 Post Open - International 0.00 2021-04-26 2021-04-15 2021-05-17 2021-05-06 2021-07-11 2021-07-13 2021-07-23 2021-07-27 2021-08-08 2022-02-04 DU SCHEMA DIRECTEUR support Based Selection Implementation D’ASSAINISSEMENT ET DE DRAINAGE DE LA VILLE DE SIKENSI CI-PRICI-228915-CS-QCBS / EVALUATION ENVIRONNEMENTALE ET SOCIALE STRATEGIQUE (EESS) Component B - Institutional Quality And Cost- Under IDA / 64520 Post 0.00 2021-04-26 2021-04-15 2021-04-28 2021-05-06 2021-06-22 2021-06-24 2021-07-04 2021-07-08 2021-07-20 2022-01-16 DU SCHEMA DIRECTEUR support Based Selection Implementation D’ASSAINISSEMENT ET DE DRAINAGE DE LA VILLE D’AGBOVILLE CI-PRICI-228917-CS-QCBS / EVALUATION ENVIRONNEMENTALE ET SOCIALE STRATEGIQUE (EESS) Component B - Institutional Quality And Cost- Under IDA / 64520 Post Open - International 0.00 2021-04-26 2021-04-15 2021-05-17 2021-05-06 2021-07-11 2021-07-13 2021-07-23 2021-07-27 2021-08-08 2022-02-04 DU SCHEMA DIRECTEUR support Based Selection Implementation D’ASSAINISSEMENT ET DE DRAINAGE DE LA VILLE DE N’DOUCI CI-PRICI-228919-CS-QCBS / EVALUATION ENVIRONNEMENTALE ET SOCIALE STRATEGIQUE (EESS) Component B - Institutional Quality And Cost- Under IDA / 64520 Post 0.00 2021-04-26 2021-04-15 2021-05-17 2021-05-06 2021-07-11 2021-07-13 2021-07-23 2021-07-27 2021-08-08 2022-02-04 DU SCHEMA DIRECTEUR support Based Selection Implementation D’ASSAINISSEMENT ET DE DRAINAGE DE LA VILLE DE TIASSALÉ CI-PRICI-237422-CS-LCS / NUMERISATION ET DIGITALISATION DES PLANS Component C - Urban Water Least Cost Under IDA / 64520 Post Open - National 0.00 2021-06-08 2021-06-03 2021-06-29 2021-08-23 2021-08-24 2021-09-03 2021-09-14 2021-09-18 2022-04-16 DE RESEAU / GEODATABASE - Sector Strengthening Selection Implementation DIRECTIONS ABENGOUROU, BASSE CÔTE ET SUD-EST CI-PRICI-237428-CS-LCS / NUMÉRISATION ET DIGITALISATION DES PLAN DE Component C - Urban Water Least Cost Under IDA / 64520 Post Open - National 0.00 2021-06-08 2021-06-03 2021-06-29 2021-08-23 2021-08-24 2021-09-03 2021-09-14 2021-09-18 2022-04-16 RÉSEAU / GEODATABASE: Sector Strengthening Selection Implementation DIRECTIONS YAMOUSSOUKRO, BOUAKÉ ET KORHOGO CI-PRICI-237432-CS-LCS / NUMÉRISATION ET DIGITALISATION DES PLAN DE Component C - Urban Water Least Cost Under IDA / 64520 Post Open - National 0.00 2021-06-08 2021-06-03 2021-06-29 2021-08-23 2021-08-24 2021-09-03 2021-09-14 2021-09-18 2022-04-16 RÉSEAU / GEODATABAS: Sector Strengthening Selection Implementation DIRECTIONS DALOA, GAGNOA ET MAN CI-PRICI-239143-CS-CQS / ÉVALUATION ENVIRONNEMENTALE ET Consultant SOCIALE STRATÉGIQUE (EESS) Component C - Urban Water Under IDA / 64520 Post Qualification Limited 0.00 2021-06-23 2021-06-14 2021-07-13 2021-08-12 2021-08-19 2022-04-16 DU SCHÉMA DIRECTEUR Sector Strengthening Implementation Selection D’ALIMENTATION EN EAU POTABLE (AEP) DU GRAND ABIDJAN INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PRICI-21276-CS-CDS / SUIVI ET RENFORCEMENT DU Component A - Urban water SYSTEME D'ALIMENTATION IDA / 59210 Prior Direct Selection Direct 0.00 Canceled 2017-08-01 2017-08-06 2017-08-11 2018-02-17 supply ELECTRIQUE DES CENTRES DE PRODUCTION CI-PRICI-47579-CS-INDV / RECRUTEMENT D'UN CONSULTANT POUR LE Individual CONSTAT D'IMPACT Component B - Institutional Under IDA / 59210 Post Consultant Direct 0.00 2018-05-08 2018-05-17 2018-05-14 2018-05-29 2018-06-02 2018-11-29 ENVIRONNEMENTAL ET support Implementation Selection SOCIAL POUR LES TRAVAUX D'AMENÉS ÉLECTRICITÉ A BINGERVILLE CI-PRICI-47551-CS-INDV / RECRUTEMENT D'UN CONSULTANT POUR LE Individual Component B - Institutional Pending CONSTAT D'IMPACT IDA / 59210 Post Consultant Limited 0.00 2016-02-23 2016-02-28 2016-03-20 2016-04-24 2016-07-23 support Implementation ENVIRONNEMENTAL ET Selection SOCIAL DES VILLES IMPACTÉES PAR LE PROJET CI-PRICI-47547-CS-INDV / RECRUTEMENT D'UN Individual CONSULTANT POUR Component B - Institutional Pending IDA / 59210 Post Consultant Limited 0.00 2017-04-24 2017-05-09 2017-05-30 2017-06-09 2017-09-07 L'ELABORATION DU PAR DES support Implementation Selection VILLES IMPACTÉES PAR LE PREMU CI-PRICI-61886-CS-QCBS / SUIVI ET CONTRÔLE DES Component A - Urban water Under IDA / 59210 Post Direct Selection Direct 0.00 2018-05-09 2018-06-05 2018-05-11 2018-06-05 2019-04-01 TRAVAUX D'AMENÉES supply Implementation ÉLECTRICITÉ PAR CI-ENERGIE Page 10 CI-PRICI-62839-CS-CDS / ETUDES TECHNIQUES D'AVANT-PROJET DETAILLEES POUR L'ALIMENTATION ELECTRIQUE DES SYSTEMES D'APPROVISIONNEMENT DE Component A - Urban water Under IDA / 59210 Post Direct Selection Direct 0.00 2018-05-30 2018-06-05 2018-06-09 2018-06-28 2018-09-26 L'EAU POTABLE DANS LES supply Implementation CENTRES URBAINS DE BINGERVILLE, AGBOVILLE, TIASSALE, NZIANOUAN, NDOUCI, KORHOGO ET FERKESSEDOUKOU (CIE) CI-PRICI-63220-CS-INDV / Individual Component B - Institutional Under EXPERT EN SUIVI SOCIAL POUR IDA / 59210 Post Consultant Open 0.00 2018-06-18 2018-06-15 2018-07-12 2018-07-13 2018-08-17 2022-08-01 support Implementation LE COMPTE DE L'ONEP Selection CI-PRICI-63217-CS-INDV / Individual EXPERT EN SUIVI Component B - Institutional Under IDA / 59210 Post Consultant Open 0.00 2018-06-18 2017-11-06 2018-07-12 2018-07-13 2018-08-17 2022-08-01 ENVIRONNEMENTAL POUR LE support Implementation Selection COMPTE DE L'ONEP CI-PRICI-77871-CS-INDV / ELABORATION D'UN PLAN D'ACTION DE Individual Component B - Institutional Under REINSTALLATION DANS LE IDA / 59210 Post Consultant Direct 0.00 2018-09-17 2018-05-17 2018-09-23 2018-10-08 2018-10-12 2019-04-10 support Implementation CADRE DES TRAVAUX Selection D'AMENES ELECTRIQUE A BINGERVILLE CI-PRICI-97121-CS-INDV / Individual RECRUTEMENT D'UNE Component B - Institutional Pending IDA / 59210 Post Consultant Direct 0.00 2019-01-28 2019-02-03 2019-02-18 2019-02-22 2021-06-01 SPECIALISTE EN support Implementation Selection ENVIRONNEMENT CI-PRICI-103431-CS-INDV / L'ELABORATION D'UN CADRE Individual Component B - Institutional Pending DE POLITIQUE DE IDA / 59210 Post Consultant Direct 0.00 2019-03-05 2019-03-25 2019-04-09 2019-04-17 2019-05-15 support Implementation REINSTALLATION (CPR) - Selection FINANCEMENT ADDITIONNEL CI-PRICI-103433-CS-INDV / ACTUALISATION DU CADRE DE Individual Component B - Institutional Pending GESTION ENVIRONNEMENTALE IDA / 59210 Post Consultant Limited 0.00 2019-03-05 2019-03-20 2019-04-10 2019-04-18 2019-05-18 support Implementation ET SOCIALE (CGES) - Selection FINANACEMENT ADDITIONNEL CI-PRICI-103484-CS-CDS / ASSISTANCE, COORDINATION ET GESTION FIDUCIAIRE DU Component B - Institutional Under IDA / 59210 Post Direct Selection Direct 0.00 2015-12-17 2015-12-27 2016-01-10 2021-01-08 PROJET DE RENFORCEMENT DE support Implementation L'EAU EN MILIEU URBAIN ( PREMU) CI-PRICI-106746-CS-CDS / CONSTAT D'IMPACT ENVIRONNEMENTAL ET SOCIAL (CIES) DU SOUS- PROJET DE RENFORCEMENT Component B - Institutional Pending IDA / 59210 Post Direct Selection Direct 0.00 2018-03-01 2018-03-11 2018-03-18 2018-04-08 DU SYSTEME D'ALIMENTATION support Implementation EN EAU POTABLE (AEP) DANS LE CENTRE URBAIN DE BEOUMIDANS LE CADRE DE LA PREPARATION DU PREMU-FA CI-PRICI-106742-CS-CDS / CONSTAT D'IMPACT ENVIRONNEMENTAL ET SOCIAL (CIES) DU SOUS- PROJET DE RENFORCEMENT DU SYSTEME D'ALIMENTATION Component B - Institutional Pending EN EAU POTABLE (AEP) DANS IDA / 59210 Post Direct Selection Direct 0.00 2018-03-08 2018-03-15 2018-03-22 2018-04-12 support Implementation LE CENTRE URBAIN DE KORHOGO ET FERKESSEDOUGOU DANS LE CADRE DE LA PREPARATION DU FINANCEMENT ADDISTIONNEL CI-PRICI-108789-CS-INDV / ELABORATION DU PLAN D'ACTION ET DE REINSTALLATION DES Individual Component B - Institutional Under PERSONNES AFFECTEES PAR IDA / 59210 Post Consultant Open 0.00 2019-04-03 2019-05-21 2019-04-30 2019-05-02 2019-05-05 2019-06-04 support Implementation LES TRAVAUX DE Selection RENFORCEMENT DU RESEAU D'EAU POTABLE DE LA VILLE D'AGBOVILLE CI-PRICI-108795-CS-INDV / ELABORATION DU PLAN D'ACTION ET DE REINSTALLATION DES Individual Component B - Institutional Pending PERSONNES AFFECTEES PAR IDA / 59210 Post Consultant Open 0.00 2019-04-03 2019-04-30 2019-05-02 2019-05-05 2019-06-04 support Implementation LES TRAVAUX DE Selection RENFORCEMENT DU RESEAU D'EAU POTABLE DE LA VILLE DE BEOUMI CI-PRICI-108796-CS-INDV / ELABORATION DU PLAN D'ACTION ET DE REINSTALLATION DES Individual Component B - Institutional Under PERSONNES AFFECTEES PAR IDA / 59210 Post Consultant Open 0.00 2019-04-03 2019-05-21 2019-04-30 2019-05-02 2019-05-05 2019-06-04 support Implementation LES TRAVAUX DE Selection RENFORCEMENT DU RESEAU D'EAU POTABLE DE LA VILLE DE BINGERVILLE Page 11 CI-PRICI-108797-CS-INDV / ELABORATION DU PLAN D'ACTION ET DE REINSTALLATION DES Individual Component B - Institutional Pending PERSONNES AFFECTEES PAR IDA / 59210 Post Consultant Open 0.00 2019-04-03 2019-04-30 2019-05-02 2019-05-05 2019-06-04 support Implementation LES TRAVAUX DE Selection RENFORCEMENT DU RESEAU D'EAU POTABLE DES VILLES DE KORHOGO ET FERKE CI-PRICI-108799-CS-INDV / ELABORATION DU PLAN D'ACTION ET DE REINSTALLATION DES Individual PERSONNES AFFECTEES PAR Component B - Institutional Under IDA / 59210 Post Consultant Open 0.00 2019-04-03 2019-05-21 2019-04-30 2019-05-02 2019-05-05 2019-06-04 LES TRAVAUX DE support Implementation Selection RENFORCEMENT DU RESEAU D'EAU POTABLE DES VILLES DE TIASSALE, N'ZIANNOUA ET SIKENSI CI-PRICI-119829-CS-CDS / CONSTAT D'IMPACT ENVIRONNEMENTAL ET SOCIAL(CIES) DU SOUS PROJET DE RENFORCEMENT DU Component B - Institutional Pending SYSTEME D'ALIMENTATION EN IDA / 59210 Post Direct Selection Direct 0.00 2019-06-19 2019-06-29 2019-07-05 2019-08-04 support Implementation EAU POTABLE (AEP) DANS LE CENTRE URBAIN DE BINGERVILLE DANS LE CADRE DE LA PREPARATION DU PREMU-FA CI-PRICI-119832-CS-CDS / CONSTAT D'IMPACT ENVIRONNEMENTAL ET SOCIAL(CIES) DU SOUS PROJET Component B - Institutional Pending IDA / 59210 Post Direct Selection Direct 0.00 2019-06-19 2019-06-29 2019-07-05 2019-08-04 DE RENFORCEMENT DU support Implementation SYSTEME D'ALIMENTATION EN EAU POTABLE (AEP) DANS LE CENTRE URBAIN D'AGBOVILLE CI-PRICI-119833-CS-CDS / CONSTAT D'IMPACT ENVIRONNEMENTAL ET SOCIAL(CIES) DU SOUS PROJET DE RENFORCEMENT DU Component B - Institutional Pending SYSTEME D'ALIMENTATION EN IDA / 59210 Post Direct Selection Direct 0.00 2019-06-19 2019-06-29 2019-07-05 2019-08-04 support Implementation EAU POTABLE (AEP) DANS LE CENTRE URBAIN DE TIASSALE /N'DOUCI/N'ZIANOUA DANS LE CADRE DE LA PREPARATION DU PREMU-FA CI-PRICI-154247-CS-INDV / APPUI A L’OFFICE NATIONALE DE L’EAU POTABLE (ONEP) Individual Component C - Urban Water DANS LA MISE EN ŒUVRE DES IDA / 64520 Post Consultant Direct 80,062.54 Signed 2020-01-22 2020-01-17 2020-02-01 2020-02-21 2020-02-11 2020-07-22 2020-02-15 2020-11-25 2021-02-14 Sector Strengthening RECOMMANDATIONS DES Selection ETUDES D’APPUI INSTITUTIONNEL CI-PRICI-159058-CS-INDV / ELABORATION D’UNE ETUDE TECHNIQUE POUR LE Individual Component A - Urban water Under RENFORCEMENT DE LA IDA / 64520 Post Consultant Limited 0.00 supply Implementation PRODUCTION D’EAU POTABLE Selection DANS LA LOCALITE D’ABONGOUA (S/P D’ARRAH) CI-PRICI-162543-CS-INDV / RECRUTEMENT D'UN(E) SPÉCIALISTE EN SAUVEGARDE Individual Component B - Institutional Under ENVIRONNEMENTALE POUR LE IDA / 64520 Post Consultant Open 0.00 2020-03-12 2020-03-02 2020-04-05 2020-04-06 2020-04-25 2024-04-09 support Implementation COMPTE DE L'ONAD DANS LE Selection CADRE DE LA MISE EN OEUVRE DU PREMU-FA CI-PRICI-172886-CS-CDS / Etude avant-projet détaillé de Component B - Institutional Pending pose de latrines dans les IDA / 64520 Post Direct Selection Direct 0.00 2020-05-19 2020-06-08 2020-06-18 2021-04-14 support Implementation écoles et centre de santé : Zone Sud (centres initiaux) CI-PRICI-172889-CS-CDS / Etude avant-projet détaillé de pose de latrines dans les Component B - Institutional Pending IDA / 64520 Post Direct Selection Direct 0.00 2020-05-19 2020-06-08 2020-06-18 2021-04-14 écoles et centre de santé : support Implementation Zone centre et nord (centres initiaux) CI-PRICI-172891-CS-CDS / Etude avant-projet détaillé de Component B - Institutional Pending pose de latrines dans les IDA / 64520 Post Direct Selection Direct 0.00 2020-05-19 2020-06-08 2020-06-18 2021-04-14 support Implementation écoles et centre de santé : villes additionnelles CI-PRICI-180983-CS-INDV / ELABORATION DU MANUEL DE Individual PROCEDURES DE MISE EN Component B - Institutional Under IDA / 59210 Post Consultant Limited 0.00 2020-06-30 2020-06-30 2020-07-20 2020-07-25 2020-07-29 2020-09-27 ŒUVRE DU PLAN DE RIPOSTE support Implementation Selection DU SECTEUR EAU ET ASSAINISSEMENT AU COVID19 CI-PRICI-182720-CS-INDV / RECRUTEMENT D'UNE Individual Component B - Institutional Under ASSISTANTE EN SUIVI IDA / 64520 Post Consultant Limited 0.00 2020-06-30 2020-06-30 2020-07-05 2020-07-26 2020-08-30 2024-12-30 support Implementation OPERATIONNEL NIVEAU I Selection POUR LE COMPTE DU PREMU Page 12 CI-PRICI-183518-CS-CDS / ETUDES TECHNIQUES D’AVANT-PROJET DETAILLE (APD) POUR L’APPROVISIONNEMENT EN Component B - Institutional Under EAU POTABLE ET LA IDA / 64520 Post Direct Selection Direct 0.00 2020-07-15 2020-07-14 2020-07-25 2020-05-07 2020-09-28 2021-06-25 support Implementation CONSTRUCTION DE BLOCS SANITAIRES DANS LES ECOLES ET CENTRES DE SANTÉ SELECTIONNES DES ZONES CENTRE ET NORD INITIALES CI-PRICI-183541-CS-CDS / ETUDES TECHNIQUES D’AVANT-PROJET DETAILLE (APD) POUR L’APPROVISIONNEMENT EN Component B - Institutional EAU POTABLE ET LA IDA / 64520 Post Direct Selection Direct 172,535.82 Signed 2020-07-16 2020-07-14 2020-07-26 2020-05-07 2020-09-29 2020-09-17 2021-06-26 support CONSTRUCTION DE BLOCS SANITAIRES DANS LES ECOLES ET CENTRES DE SANTÉ SELECTIONNES DE LA ZONE DES VILLES ADDITIONNELLES CI-PRICI-183542-CS-CDS / ETUDES TECHNIQUES D’AVANT-PROJET DETAILLE (APD) POUR L’APPROVISIONNEMENT EN Component B - Institutional EAU POTABLE ET LA IDA / 64520 Post Direct Selection Direct 199,101.01 Signed 2020-07-16 2020-07-14 2020-07-26 2020-05-07 2020-09-29 2020-09-16 2021-06-26 support CONSTRUCTION DE BLOCS SANITAIRES DANS LES ECOLES ET CENTRES DE SANTÉ SELECTIONNES DE LA ZONE SUD INITIALE CI-PRICI-203547-CS-INDV / APPUI A LA PASSATION DES Individual Component D - Project Under MARCHES DANS LE CADRE DE IDA / 64520 Post Consultant Limited 0.00 2020-11-10 2020-10-22 2020-11-15 2020-11-17 2020-11-21 2021-01-05 management Implementation L'ANALYSE DES OFFRES Selection (SÉLECTION 2019) CI-PRICI-204628-CS-INDV / ASSISTANCE, CONSEIL, INVENTAIRE ET COMPTABILITE Individual Component C - Urban Water Under PATRIMONIALE PUBLIQUE IDA / 64520 Post Consultant Limited 0.00 2020-11-26 2021-03-02 2020-12-16 2020-12-21 2020-12-25 2021-02-08 Sector Strengthening Implementation DANS LE CADRE DU Selection RENFORCEMENT DES CAPACITES DE L'ONEP CI-PRICI-228012-CS-INDV / APPUI AU MINASS POUR LA REDACTION DES TDR RELATIFS: Individual 1. CAMPAGNES DE Component B - Institutional Under IDA / 64520 Post Consultant Limited 0.00 2021-04-19 2021-04-07 2021-05-04 2021-05-25 2021-05-31 2021-07-15 SENSIBILISATION A L'HYGIENE support Implementation Selection ET A L’ASSAINISSEMENT 2. ETUDES SUR LE MODE GESTION PERENNE DES INSTALLATIONS SANITAIRES DES ECOLES ET CENTRES DE SANTE Page 13 PROCUREMENT PLAN Project information: Jordan- Strengthening Reform Management in Jordan P171965 Project Implementation agency: Ministry of Planning and International Cooperation Date of the Procurement Plan: Jan. 22, 2020 Period covered by this Procurement Plan: six months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Ministry of Planning and International Cooperation (MoPIC) has clear regulations in place with regards to procurement responsibility. The majority of procurement activities of MoPIC is supply of goods and consultancy services with estimated cost not exceeding JD 20,000., such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. PROCUREMENT Jordan : Strengthening Reform Management in Jordan PLAN General Information Country: Jordan Bank’s Approval Date of the Original Procurement Plan: 2020-01-22 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171965 GPN Date: Project Name: Strengthening Reform Management in Jordan Loan / Credit No: TF / B1168 Ministry of Planning and International Cooperation Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1.1-CS-25 / Heath 1. Support to reform Single Stage - One TF / B1168 Post Request for Bids Open - National 29,250.00 0.00 Canceled 2020-01-27 2020-01-26 2020-02-01 2020-03-14 2020-02-11 2020-04-13 2020-02-23 2020-05-18 2020-11-14 insurance management Envelope C2-GO-3 / IT Equipment for 2. Strengthening the PIM-PPP Single Stage - One TF / B1168 Post Request for Bids Open - National 10,000.00 3,385.05 Completed 2020-01-28 2020-01-26 2020-02-02 2020-03-15 2020-02-11 2020-04-14 2020-02-18 2020-05-19 2020-03-02 2020-11-15 2020-04-30 PPP Unit framework and function Envelope C2-GO-4 / laptops for PPP 2. Strengthening the PIM-PPP Request for Single Stage - One TF / B1168 Post Limited 15,000.00 5,227.08 Completed 2020-03-07 2020-02-26 2020-05-02 2020-05-04 2020-10-29 2021-01-13 unit framework and function Quotations Envelope C2-GO-5 / Design, Supply and Installation of the 2. Strengthening the PIM-PPP Single Stage - One TF / B1168 Post Request for Bids Open - International 650,000.00 589,810.34 Signed 2020-05-05 2020-05-07 2020-05-10 2020-05-07 2020-06-21 2020-07-01 2020-07-21 2020-09-27 2020-08-25 2020-12-08 2021-02-21 National Registry of framework and function Envelope Investment Projects (NRIP) C1.1-GO-26 / Laptops and IT 1. Support to reform Single Stage - One TF / B1168 Post Request for Bids Open - National 28,600.00 0.00 Canceled 2020-06-30 2020-07-05 2020-08-16 2020-09-15 2020-10-20 2021-04-18 Equipment management Envelope C1.1-GO-28 / Laptops and IT 1. Support to reform Request for Single Stage - One TF / B1168 Post Limited 28,600.00 33,723.55 Signed 2020-08-15 2020-08-11 2020-10-10 2020-09-14 2021-04-08 Equipment management Quotations Envelope C1.1-GO-29 / Equip 1. Support to reform Single Stage - One Conference room-video TF / B1168 Post Request for Bids Open - National 98,870.00 0.00 Canceled 2020-10-13 2020-10-18 2020-11-29 2020-12-29 2021-02-02 2021-08-01 management Envelope conferencing at MoPIC 2. Strengthening the PIM-PPP Single Stage - One C2-GO-6 / PIM equipment TF / B1168 Post Request for Bids Open - National 19,800.00 0.00 Canceled 2020-12-13 2020-12-10 2020-12-18 2021-01-29 2021-02-28 2021-04-04 2021-10-01 framework and function Envelope C1.2-GO-18 / IT Equipment 1. Support to reform Single Stage - One TF / B1168 Post Request for Bids Open - National 7,000.00 3,996.42 Signed 2021-03-22 2021-03-14 2021-03-27 2021-03-24 2021-05-08 2021-04-04 2021-06-07 2021-04-18 2021-07-12 2021-05-20 2022-01-08 for FCCL- MoF management Envelope Pending C2-GO-7 / Laptops and 2. Strengthening the PIM-PPP Request for Single Stage - One TF / B1168 Post Limited 19,800.00 0.00 Implementati 2021-07-06 2021-08-31 2022-02-27 Printers for PIM unit framework and function Quotations Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2-CS-2 / PPP Regulations - Project Cycle Regulation/ Project Procurement and Tendering Procedures For projects under a certain Consultant 2. Strengthening the PIM-PPP threshold + Regulations for TF / B1168 Post Qualification Limited 200,000.00 359,348.69 Signed 2020-01-29 2020-02-04 2020-02-12 2020-03-03 2020-03-13 2020-06-03 2020-04-17 2020-06-08 2020-10-14 framework and function Direct proposals,PDF Selection regulations and Common Clause Regulations, PIM Regulations/ FCCL Regulations INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual 1. Support to reform C1.1-CS-4 / M&E Specialist TF / B1168 Post Consultant Direct 20,873.00 56,684.78 Signed 2019-09-16 2020-03-24 2019-09-26 2019-09-01 2019-10-17 2019-08-01 2019-11-21 2019-09-12 2020-05-19 management Selection Individual C1.1-CS-7 / Administrative 1. Support to reform TF / B1168 Post Consultant Direct 7,035.00 17,766.74 Signed 2019-09-02 2020-03-24 2019-09-12 2019-08-14 2019-10-03 2019-08-14 2019-11-07 2019-09-12 2020-05-05 Assistant management Selection Individual C1.1-CS-16 / Financial 1. Support to reform TF / B1168 Post Consultant Direct 2,461.00 44,005.64 Signed 2019-12-02 2020-03-24 2019-12-12 2020-04-09 2020-01-02 2020-08-17 2020-02-06 2020-10-01 2020-08-04 Manager management Selection Page 1 Individual C1.1-CS-17 / Procurement 1. Support to reform TF / B1168 Post Consultant Direct 2,101.00 38,928.07 Signed 2020-01-02 2020-03-24 2020-01-12 2020-04-09 2020-02-02 2020-08-17 2020-03-08 2020-11-01 2020-09-04 Manager management Selection C1.1-CS-19 / Legal/Policy Individual 1. Support to reform Consultant for the Reform TF / B1168 Post Consultant Limited 24,000.00 0.00 Canceled 2020-01-28 2020-01-23 2020-02-02 2020-02-23 2020-03-29 2020-09-25 management Secretariat Selection Individual 1. Support to reform C1.1-CS-24 / Consultant TF / B1168 Post Consultant Direct 14,124.00 0.00 Canceled 2020-02-03 2020-02-13 2020-03-05 2020-04-09 2020-10-06 management Selection Individual 1. Support to reform C1.1-CS-5 / Researcher 1 TF / B1168 Post Consultant Direct 10,369.00 27,360.77 Signed 2019-09-16 2020-03-24 2019-09-26 2019-08-14 2019-10-17 2020-09-01 2019-11-21 2019-09-12 2020-05-19 management Selection Individual 1. Support to reform C1.1-CS-8 / Logestic Officer TF / B1168 Post Consultant Direct 13,466.00 34,687.21 Signed 2019-09-16 2020-03-24 2019-09-26 2020-08-02 2019-10-17 2019-08-14 2019-11-21 2019-09-12 2020-05-19 management Selection Individual C1.1-CS-20 / Monitering and 1. Support to reform TF / B1168 Post Consultant Open 49,435.00 0.00 Canceled 2020-04-01 2020-03-02 2020-05-20 2020-06-10 2020-07-15 2021-01-11 Evaluation Manager management Selection Individual 1. Support to reform C1.1-CS-9 / Analyst 1 TF / B1168 Post Consultant Open 31,780.00 18,550.07 Completed 2020-04-01 2020-03-02 2020-05-20 2020-05-17 2020-06-10 2020-05-26 2020-07-15 2020-06-01 2021-01-11 2021-06-01 management Selection C1.1-CS-11 / Individual 1. Support to reform Communication and Reporting TF / B1168 Post Consultant Open 49,435.00 0.00 Canceled 2020-04-01 2020-03-02 2020-05-20 2020-06-10 2020-07-15 2021-01-11 management Manager Selection Individual C1.1-CS-12 / Sectoral 1. Support to reform TF / B1168 Post Consultant Open 42,373.00 0.00 Canceled 2020-04-01 2020-03-02 2020-05-20 2020-06-10 2020-07-15 2021-01-11 Reform Lead management Selection C1.1-CS-13 / Individual 1. Support to reform Macroeconomic and Fiscal TF / B1168 Post Consultant Open 33,898.00 0.00 Canceled 2020-05-01 2020-03-02 2020-06-19 2020-07-10 2020-08-14 2021-02-10 management Reform Lead Selection Individual C1.1-CS-14 / Business 1. Support to reform TF / B1168 Post Consultant Open 38,136.00 55,853.31 Signed 2020-04-01 2020-03-02 2020-05-20 2020-05-18 2020-06-10 2020-06-03 2020-07-15 2020-10-03 2021-01-11 Environment Lead management Selection C1.1-CS-15 / Labor, Gender Individual 1. Support to reform and Social Protection Reform TF / B1168 Post Consultant Open 42,373.00 0.00 Canceled 2020-04-01 2020-03-02 2020-05-20 2020-06-10 2020-07-15 2021-01-11 management Lead Selection Individual 1. Support to reform C1.1-CS-6 / Researcher 2 TF / B1168 Post Consultant Direct 14,124.00 0.00 Canceled 2020-03-02 2020-03-03 2020-03-12 2020-04-02 2020-05-07 2020-11-03 management Selection C1.2-CS-1 / Business analyst 1 to assist the Ministry of Industry, Trade, and Supply Individual 1. Support to reform (MoITS) to complete reforms TF / B1168 Post Consultant Open 19,500.00 0.00 Canceled 2020-05-05 2020-06-10 2020-06-23 2020-07-14 2020-08-18 2021-02-14 management on the Investor Journey (From Selection Registration, Licensing, and closure of business) C1.2-CS-2 / Business analyst 2 to assist the Ministry of Industry, Trade, and Supply Individual 1. Support to reform (MoITS) to complete reforms TF / B1168 Post Consultant Open 19,500.00 0.00 Canceled 2020-05-05 2020-06-10 2020-06-23 2020-07-14 2020-08-18 2021-02-14 management on the Investor Journey (From Selection Registration, Licensing, and closure of business) Individual C1.1-CS-21 / Environmental 1. Support to reform TF / B1168 Post Consultant Open 10,000.00 43,200.00 Signed 2020-06-30 2020-06-10 2020-08-18 2020-08-13 2020-09-08 2020-08-16 2020-10-13 2020-09-01 2021-04-11 Safeguard Specialist-part time management Selection C1.1-CS-22 / Social Individual 1. Support to reform Safeguards Specialist and TF / B1168 Post Consultant Open 28,000.00 0.00 Canceled 2020-06-30 2020-06-10 2020-08-18 2020-09-08 2020-10-13 2021-04-11 management Consultation Lead Selection Individual 2. Strengthening the PIM-PPP C2-CS-4 / ICT expert TF / B1168 Post Consultant Open 20,000.00 13,440.00 Completed 2020-06-30 2020-06-10 2020-08-18 2020-06-30 2020-09-08 2020-06-30 2020-10-13 2020-07-15 2021-04-11 2020-12-08 framework and function Selection Individual C1.2-CS-3 / Labor Market 1. Support to reform TF / B1168 Post Consultant Open 20,000.00 0.00 Canceled 2020-06-30 2020-06-10 2020-08-18 2020-09-08 2020-10-13 2021-04-11 Researcher management Selection Individual C1.2-CS-4 / Project 1. Support to reform TF / B1168 Post Consultant Open 26,000.00 0.00 Canceled 2020-06-30 2020-06-10 2020-08-18 2020-09-08 2020-10-13 2021-04-11 Management Specialist management Selection C1.2-CS-5 / Individual 1. Support to reform Communications and TF / B1168 Post Consultant Direct 17,500.00 28,688.29 Signed 2020-06-30 2020-07-01 2020-07-10 2020-06-20 2020-07-31 2020-06-21 2020-09-04 2020-06-24 2021-03-03 management Reporting coordinator Selection Individual C1.2-CS-6 / Value Chain 1. Support to reform TF / B1168 Post Consultant Direct 13,000.00 21,939.67 Signed 2020-06-01 2020-06-10 2020-06-11 2020-04-12 2020-07-02 2020-05-26 2020-08-06 2020-06-01 2021-02-02 Analysts (CRI)-1 management Selection Individual C1.2-CS-7 / Value Chain 1. Support to reform TF / B1168 Post Consultant Direct 8,000.00 13,278.83 Signed 2020-06-01 2020-06-10 2020-06-11 2020-04-12 2020-07-02 2020-05-25 2020-08-06 2020-06-01 2021-02-02 Analysts (CRI)-2 management Selection Individual C1.1-CS-20-2 / monitoring 1. Support to reform TF / B1168 Post Consultant Open 49,435.00 0.00 Canceled 2020-08-10 2020-09-01 2020-09-28 2020-10-19 2020-11-23 2021-05-22 and evaluation manager management Selection Individual C1.1-CS-12-2 / Sectoral 1. Support to reform TF / B1168 Post Consultant Open 42,373.00 47,813.82 Signed 2020-08-10 2020-09-01 2020-09-28 2021-05-26 2020-10-19 2021-05-26 2020-11-23 2021-06-01 2021-05-22 reform lead management Selection Page 2 C1.1-CS-13-2 / Individual 1. Support to reform Macroeconomic and fiscal TF / B1168 Post Consultant Open 33,898.00 0.00 Canceled 2020-08-10 2020-09-01 2020-09-28 2020-10-19 2020-11-23 2021-05-22 management reform lead Selection C1.1-CS-11-2 / Individual 1. Support to reform COMMUNICATION AND TF / B1168 Post Consultant Open 49,435.00 42,076.16 Signed 2020-08-10 2020-09-01 2020-09-28 2020-12-29 2020-10-19 2020-12-27 2020-11-23 2021-03-01 2021-05-22 management REPORTING MANAGER Selection C1.1-CS-15-2 / Labor, Individual 1. Support to reform gender, and social protection TF / B1168 Post Consultant Open 42,373.00 56,420.31 Signed 2020-08-10 2020-09-01 2020-09-28 2020-12-29 2020-10-19 2020-12-31 2020-11-23 2021-03-01 2021-05-22 management reform lead Selection C1.1-CS-22-2 / social Individual 1. Support to reform safeguards specialist and TF / B1168 Post Consultant Open 28,000.00 0.00 Canceled 2020-08-10 2020-09-01 2020-09-28 2020-10-19 2020-11-23 2021-05-22 management consultation lead Selection Individual C1.2-CS-1-2 / business 1. Support to reform TF / B1168 Post Consultant Open 19,500.00 21,994.36 Signed 2020-08-10 2020-09-01 2020-09-28 2020-12-29 2020-10-19 2021-03-14 2020-11-23 2021-04-15 2021-05-22 analyst 1 -MoITS management Selection Individual C1.2-CS-2-2 / Business 1. Support to reform TF / B1168 Post Consultant Open 19,500.00 24,863.19 Signed 2020-08-10 2020-09-01 2020-09-28 2020-12-29 2020-10-19 2020-12-31 2020-11-23 2021-03-01 2021-05-22 analyst 2 for MoITS management Selection Individual C1.2-CS-3-2 / labor market 1. Support to reform TF / B1168 Post Consultant Open 20,000.00 0.00 Canceled 2020-08-10 2020-09-01 2020-09-28 2020-10-19 2020-11-23 2021-05-22 researcher management Selection Individual C1.2-CS-4-2 / project 1. Support to reform TF / B1168 Post Consultant Open 26,000.00 0.00 Canceled 2020-08-10 2020-09-01 2020-09-28 2020-10-19 2020-11-23 2021-05-22 management specialist-MoL management Selection Individual C1.2-CS-8 / Graphic 1. Support to reform TF / B1168 Post Consultant Direct 3,600.00 2,800.00 Signed 2020-08-10 2020-06-24 2020-08-20 2020-08-13 2020-09-10 2020-08-16 2020-10-15 2020-09-01 2021-04-13 Designer management Selection Individual 1. Support to reform C1.2-CS.8 / Graphic Designer TF / B1168 Post Consultant Direct 3,600.00 0.00 Canceled 2020-08-01 2020-08-11 2020-09-01 2020-09-23 2021-03-22 management Selection Individual C1.2-CS.9 / Senior Economic 1. Support to reform TF / B1168 Post Consultant Open 28,776.00 0.00 Canceled 2020-08-25 2020-09-01 2020-10-13 2020-11-03 2020-12-08 2021-06-06 Policy Analyst 1-MOF management Selection C1.2-CS.10 / Senior Individual 1. Support to reform Economic Policy Analyst 2- TF / B1168 Post Consultant Open 28,776.00 0.00 Canceled 2020-08-25 2020-09-01 2020-10-13 2020-11-03 2020-12-08 2021-06-06 management MOF Selection C1.2-CS.11 / Senior Individual 1. Support to reform Economic Policy Analyst 3- TF / B1168 Post Consultant Open 28,776.00 0.00 Canceled 2020-08-25 2020-09-01 2020-10-13 2020-11-03 2020-12-08 2021-06-06 management MOF Selection C1.2-CS.12 / Senior Individual 1. Support to reform Economic Policy Analyst 4- TF / B1168 Post Consultant Open 28,776.00 0.00 Canceled 2020-08-25 2020-09-01 2020-10-13 2020-11-03 2020-12-08 2021-06-06 management MOF Selection Individual C1.2-CS.13 / Sustainable 1. Support to reform TF / B1168 Post Consultant Direct 24,000.00 29,000.00 Signed 2020-08-25 2020-08-24 2020-09-04 2020-09-02 2020-09-25 2020-09-16 2020-10-30 2020-09-20 2021-04-28 Development Advisor- MEMR management Selection Individual C2-CS-3 / Deputy Director of 2. Strengthening the PIM-PPP TF / B1168 Post Consultant Open 59,322.00 0.00 Canceled 2020-10-01 2020-09-29 2020-11-19 2020-12-10 2021-01-14 2021-07-13 PIM framework and function Selection Individual C2-CS-6 / Project 2. Strengthening the PIM-PPP TF / B1168 Post Consultant Open 27,119.00 23,906.91 Signed 2020-10-01 2020-09-29 2020-11-19 2021-03-15 2020-12-10 2021-03-15 2021-01-14 2021-03-22 2021-07-13 Management Specialist framework and function Selection Individual C1.2-CS-14 / international 1. Support to reform TF / B1168 Post Consultant Direct 27,119.00 29,619.18 Signed 2020-10-01 2020-10-07 2020-10-11 2020-11-03 2020-11-01 2020-12-03 2020-12-06 2020-12-15 2021-06-04 cooperation advisor management Selection Individual C2-CS-7 / ICT expert 2-full 2. Strengthening the PIM-PPP TF / B1168 Post Consultant Direct 50,000.00 37,235.54 Signed 2020-11-25 2020-10-20 2020-12-05 2020-11-29 2020-12-26 2020-12-01 2021-01-30 2020-12-15 2021-12-30 time framework and function Selection C1.2-CS-16 / Drafting of 1. Support to reform Investemnet law and TF / B1168 Post Direct Selection Direct 50,000.00 68,716.50 Signed 2020-12-13 2020-11-26 2020-12-23 2020-12-15 2021-02-26 2021-05-16 2021-08-25 management regulations C1.2-CS-17 / upgrading 1. Support to reform Under TF / B1168 Post Direct Selection Direct 141,250.00 0.00 2021-01-20 2021-03-01 2021-01-30 2021-03-02 2021-04-05 2021-10-02 ISTD system management Implementation Individual C1.2-CS-19 / Financial 1. Support to reform TF / B1168 Post Consultant Open 34,000.00 0.00 Canceled 2021-01-20 2021-03-24 2021-03-10 2021-03-31 2021-05-05 2022-05-01 Specialist-FCCL-MoF management Selection Individual C1.2-CS.20 / 1. Support to reform TF / B1168 Post Consultant Open 34,000.00 0.00 Canceled 2021-01-20 2021-03-24 2021-03-10 2021-03-31 2021-05-05 2021-11-01 Macroeconomist-FCCL-MoF management Selection Individual 1. Support to reform C1.1-CS.6 / Researcher 2 TF / B1168 Post Consultant Open 14,124.00 1,191.82 Completed 2020-04-01 2020-03-01 2020-05-20 2020-05-17 2020-06-10 2020-05-17 2020-07-15 2020-05-18 2021-01-11 2021-05-31 management Selection Individual C2-CS-5 / Economic and 2. Strengthening the PIM-PPP TF / B1168 Post Consultant Open 37,288.00 0.00 Canceled 2020-10-01 2020-09-29 2020-11-19 2020-12-10 2021-01-14 2021-07-13 Financial Specialist framework and function Selection Individual C1.2-CS.21 / Senior Legal 1. Support to reform Under TF / B1168 Post Consultant Open 16,950.00 15,300.42 2021-03-30 2021-03-24 2021-05-18 2021-05-27 2021-06-08 2021-05-30 2021-07-13 2022-01-09 Researcher management Implementation Selection Individual C1.2-CS.22 / Legal Research 1. Support to reform Under TF / B1168 Post Consultant Open 22,000.00 19,125.53 2021-03-30 2021-03-24 2021-05-18 2021-05-27 2021-06-08 2021-06-13 2021-07-13 2022-01-09 Officer management Implementation Selection Page 3 Individual C2-CS-5-2 / Economic and 2. Strengthening the PIM-PPP Under TF / B1168 Post Consultant Open 37,288.00 0.00 2021-04-01 2021-03-24 2021-05-20 2021-06-10 2021-07-15 2022-01-11 Financial Specialist-Relaunch framework and function Implementation Selection Individual C1.1-CS-30 / Program 1. Support to reform TF / B1168 Post Consultant Open 15,740.00 16,256.70 Signed 2021-04-15 2021-04-06 2021-06-03 2021-06-06 2021-06-24 2021-06-07 2021-07-29 2021-06-14 2022-01-25 Coordinator management Selection C1.1-CS-31 / Economic and Individual 1. Support to reform Business Environment Reform TF / B1168 Post Consultant Open 40,620.00 47,813.82 Signed 2021-04-15 2021-04-06 2021-06-03 2021-05-27 2021-06-24 2021-05-27 2021-07-29 2021-06-01 2022-01-25 management Lead Selection Individual C1.1-CS-32 / Monitoring and 1. Support to reform Under TF / B1168 Post Consultant Open 18,620.00 0.00 2021-05-20 2021-05-26 2021-07-08 2021-07-29 2021-09-02 2022-03-01 Evaluation Officer management Implementation Selection Individual 1. Support to reform C1.2-CS-23 / Researcher TF / B1168 Post Consultant Direct 18,000.00 17,461.61 Signed 2021-06-01 2021-06-01 2021-06-11 2021-05-31 2021-07-02 2021-05-31 2021-08-06 2021-05-31 2022-02-02 management Selection Individual C2-CS-8 / Education Sector 2. Strengthening the PIM-PPP Under TF / B1168 Post Consultant Open 48,000.00 0.00 2021-06-25 2021-06-14 2021-08-13 2021-09-03 2021-10-08 2022-04-06 Specilalist framework and function Implementation Selection Individual C2-CS-9 / Energy Sectoral 2. Strengthening the PIM-PPP Under TF / B1168 Post Consultant Open 48,000.00 0.00 2021-06-25 2021-06-14 2021-08-13 2021-09-03 2021-10-08 2022-04-06 Specilaist framework and function Implementation Selection Individual C2-CS-10 / Environement 2. Strengthening the PIM-PPP Under TF / B1168 Post Consultant Open 48,000.00 0.00 2021-06-25 2021-06-14 2021-08-13 2021-09-03 2021-10-08 2022-04-06 Sectoral Specilaist framework and function Implementation Selection Individual C2-CS-11 / Health Sectoral 2. Strengthening the PIM-PPP Under TF / B1168 Post Consultant Open 48,000.00 0.00 2021-06-25 2021-06-14 2021-08-13 2021-09-03 2021-10-08 2022-04-06 Specialist framework and function Implementation Selection Individual C2-CS-12 / Tourism Sectoral 2. Strengthening the PIM-PPP Under TF / B1168 Post Consultant Open 48,000.00 0.00 2021-06-25 2021-06-14 2021-08-13 2021-09-03 2021-10-08 2022-04-06 Specilaist framework and function Implementation Selection Individual C2-CS-13 / Transport 2. Strengthening the PIM-PPP Under TF / B1168 Post Consultant Open 48,000.00 0.00 2021-06-25 2021-06-14 2021-08-13 2021-09-03 2021-10-08 2022-04-06 Sectoral Specilaist framework and function Implementation Selection Individual C2-CS-14 / Agriculture 2. Strengthening the PIM-PPP Under TF / B1168 Post Consultant Open 48,000.00 0.00 2021-06-25 2021-06-14 2021-08-13 2021-09-03 2021-10-08 2022-04-06 Sectoral Specilaist framework and function Implementation Selection C1.2-CS-24 / Fccl Training- 1. Support to reform TF / B1168 Post Direct Selection Direct 3,000.00 2,820.87 Signed 2021-06-01 2021-05-03 2021-06-11 2021-05-23 2021-08-15 2021-06-05 2022-02-11 Capacity Building (Excel VBA) management C1.2-CS-25 / Upgrade the 1. Support to reform Under CRM system to include the TF / B1168 Post Direct Selection Direct 32,500.00 0.00 2021-07-01 2021-06-20 2021-07-11 2021-09-14 2022-03-13 management Implementation IGM module Individual C1.1-CS-33 / Social 1. Support to reform TF / B1168 Post Consultant Open 19,000.00 0.00 Under Review 2021-07-01 2021-06-24 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Safeguards Officer management Selection C2-CS-15 / Capacity Building 2. Strengthening the PIM-PPP for PPP unit in PPP TF / B1168 Post Direct Selection Direct 22,500.00 0.00 Under Review 2021-07-01 2021-06-24 2021-07-11 2021-09-14 2022-03-13 framework and function Procurement and Financing Individual C1.1-CS-34 / Labor, Gender 1. Support to reform TF / B1168 Post Consultant Open 20,000.00 0.00 Under Review 2021-07-01 2021-06-24 2021-08-19 2021-09-09 2021-10-14 2022-04-12 and Social Protection Analyst management Selection Page 4 Textual Procurement Plan (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: April 2016]: Revision of Updated Procurement Plan, April 2017] 2. Date of General Procurement Notice: May 2017 3. Period covered by this procurement plan: The procurement period of project covered the first 18 months since April 2017 to December 2018. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Risk Rating - Substantial Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 3 million All 2. NCB (Goods) Above US$ 2 million All above threshold 3. ICB (Works) Above US$ 20 million All 4. NCB (Works) Above US$ 10 million All above threshold 5. Shopping for Works (below US$ None 200,000) Shopping for Goods (below US$ None 100,000) 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: not applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan issued by the VPMO for VinhPhuc-FRWMP 5. 6. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 02 Not Applicable 7. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 0 0 No N/A Works of the ICB contrac (Works) ts above US$ 10 million Summary 0 0 No N/A of the ICB (Goods) Summary 25.6 3 No Prior NCB of the NCB Works (Works) contrac ts above US$ 10 million Summary 0.25 1 No Post of the NCB (Goods) Summary 0 0 No N/A of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1 million QCBS, QBS, FBS, LCS 2. Single Source (Firms) Above US$ 1 million SSS 3. Individual Above US$ 300,000 IC 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable]: 06 QCBS packages may be subject to advance procurement and retroactive financing. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comments of ed s by Assignmen Cost Bank t US$ (Prior / million Post) Summary 9.950 3 Prior Prior of number review of of QCBS contracts packages that will exceeding be let US$ 1 under million QCBS Summary 1.315 4 Post Post of number review of of CQS and contracts QCBS that will packages be let below US$ under 1 million other methods for firms Summary 0.785 5 Prior Prior of number and review of of Post Procurem contracts ent IC and with IC Individual contracts Consultant exceeding s US$ 300,000 PROCUREMENT Vietnam : Vinh Phuc Flood Risk and Water Management Project PLAN General Information Country: Vietnam Bank’s Approval Date of the Original Procurement Plan: 2017-06-08 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152460 GPN Date: 2017-05-10 Project Name: Vinh Phuc Flood Risk and Water Management Project Loan / Credit No: IBRD / 86140 V Executing Agency(ies): INH PHUC FOREIGN CONCESSIONAL LOANS PROJECT MANAGEMENT OFFICE (VPMO) WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CW 01 / Upgrading Sau Vo Lake in basin B3 - Lot 1: Dredging of Sau Vo retention lake and construction of a Component 1 - Flood Risk Single Stage - One 13,700,000.0 2019-07- dumping site for mud at Dong IBRD / 86140 Prior Request for Bids Open - National 0.00 Canceled 2017-10-02 2017-10-07 2017-11-18 2018-01-02 2018-02-06 Management Envelope 0 31 Mong. Lot 2: Construction of a service road for management and operation of Sau Vo retention lake CW 02 / Upgrading basin C: Construction of 02 regulatory Component 1 - Flood Risk Single Stage - One 11,900,000.0 12,295,553. 2019-07- sluices (Cau Ton and Cau Sat). IBRD / 86140 Prior Request for Bids Open - National Signed 2017-09-15 2018-05-28 2017-09-20 2017-11-01 2018-07-12 2017-12-16 2018-08-28 2018-01-20 2018-09-21 Management Envelope 0 37 14 Dredging of 04 rivers (Ba Hanh, Tranh, Cau Bon and Noi) CW 05 / Construction of Regulatory Sluices Lac Y, Vinh Component 1 - Flood Risk Single Stage - One 4,013,112.5 2022-03- Son; Dredging Phan River IBRD / 86140 Post Request for Bids Open - National 4,500,000.00 Signed 2020-12-06 2020-12-18 2020-12-11 2021-01-10 2021-01-18 2021-02-24 2021-01-25 2021-03-31 2021-02-08 Management Envelope 1 26 section from Dam Vac outlet to Sau Vo 2 Sluice Gate CW 01A / Construction of Inlet Canal (downtreaming Component 1 - Flood Risk Single Stage - One 11,145,390.0 2021-03- from Road 303 to Nguyet Duc IBRD / 86140 Prior Request for Bids Open - National 0.00 Canceled 2019-05-30 2019-11-19 2019-06-04 2019-07-04 2019-08-18 2019-09-22 Management Envelope 0 15 retention pond) and Nguyet Duc Reservoir CW01A / 2km of Nguyet Duc Component 1 - Flood Risk Single Stage - One 5,048,350.5 2022-02- Inlet Canal and Nguyet Duc IBRD / 86140 Post Request for Bids Open - National 4,775,000.00 Signed 2020-12-24 2021-02-06 2020-12-25 2021-01-24 2021-03-16 2021-02-08 2021-03-21 2021-02-22 2021-04-06 Management Envelope 2 22 Retention Lake National CW09 / Construction of Procurement Under Component 2 - Water Single Stage - One 2023-01- wastewater collection system IBRD / 86140 Post Request for Bids Open - National Document - 1 1,863,050.00 0.00 Implementat 2021-04-25 2021-04-30 2021-05-30 2021-06-20 2021-07-18 Environmental Management Envelope 09 of Huong Canh town Envelope process ion (Non Bank-SPD) National CW10 / Construction of Procurement Pending decentralized waste water Component 2 - Water Single Stage - One 2023-04- IBRD / 86140 Post Request for Bids Open - National Document - 1 2,370,270.00 0.00 Implementat 2021-06-25 2021-06-30 2021-07-30 2021-09-13 2021-10-18 collection and waste collection Environmental Management Envelope 11 Envelope process ion points along Phan river (Non Bank-SPD) CW03 / Nhi Hoang Lake, Kim xa Pump Station, culvert Component 1 - Flood Risk Single Stage - One 12,268,000.0 2023-01- across the dyke, discharge IBRD / 86140 Prior Request for Bids Open - National 0.00 Canceled 2021-03-31 2021-04-05 2021-05-17 2021-07-01 2021-08-05 Management Envelope 0 27 canal and regulatory gate at K11+369 CW04B / Supply and installation of equipment, Pending Component 1 - Flood Risk Single Stage - One Other (with field 14,626,880.0 2023-10- construction and IBRD / 86140 Prior Request for Bids Open - National 0.00 Implementat 2021-06-23 2021-06-28 2021-07-28 2021-09-16 2021-10-21 Management Envelope for explanation) 0 21 commisioning of Ngu Kien ion pump station CW 03 / Supply and installation of equipment, Under Component 1 - Flood Risk Single Stage - One Other (with field 11,661,620.0 2023-08- construction and IBRD / 86140 Prior Request for Bids Open - National 0.00 Implementat 2021-06-04 2021-06-14 2021-06-09 2021-06-18 2021-07-09 2021-07-30 2021-08-27 Management Envelope for explanation) 0 27 commisioning of Kim Xa ion Pump Station and auxillaries CW08 / Construction of wastewater collection and National treatment system of towns: Procurement Under Tho Tang, Tam Hong, Yen Lac Component 2 - Water Single Stage - One 10,611,530.0 2023-02- IBRD / 86140 Prior Request for Bids Open - National Document - 1 0.00 Implementat 2021-06-04 2021-06-14 2021-06-09 2021-06-18 2021-07-09 2021-07-30 2021-08-27 (03 Lot). Environmental Management Envelope 0 18 Envelope process ion - Lot CW08.1 (Non Bank-SPD) - Lot CW08.2 - Lot CW08.3 CW04A / Construction of suction canal, discharge canal and Ngu Kien retention lake National (02 Lot): Procurement Pending - Lot CW04A.1. Construction Component 1 - Flood Risk Single Stage - One 18,086,570.0 2023-10- IBRD / 86140 Prior Request for Bids Open - National Document - 1 0.00 Implementat 2021-06-23 2021-06-28 2021-07-28 2021-09-11 2021-10-16 of Construction of suction Management Envelope 0 16 Envelope process ion canal, and Ngu Kien retention (Non Bank-SPD) lake - Lot CW04A.2. Construction of Ngu Kien discharge canal CW06 / Supply and installation of equipment, Request for Bids - Pending construction and Component 1 - Flood Risk Single Stage - One Works (without 24,336,430.0 2024-05- IBRD / 86140 Prior Request for Bids Open - International 0.00 Implementat 2021-06-30 2021-07-10 2021-09-08 2021-11-07 2021-12-12 commisioning of discharge Management Envelope prequalification) 0 30 ion system of Nguyet Duc Pump SPD Station CW07 / Construcion of Nguyet Duc suction canal National (from Sau Vo 2 culvert to Procurement Pending DT.303) and dredging of Sau Component 1 - Flood Risk Single Stage - One 17,195,180.0 2023-10- IBRD / 86140 Prior Request for Bids Open - National Document - 1 0.00 Implementat 2021-06-23 2021-06-28 2021-07-28 2021-09-26 2021-10-31 Vo lake and Nguyet Duc Management Envelope 0 31 Envelope process ion Discharge Canal (02 Lot): (Non Bank-SPD) - Lot CW07.1 - Lot CW07.2 Page 1 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3 - Pending GD 01 / Equipment for the Implementation Support, Single Stage - One IBRD / 86140 Post Request for Bids Open - National 162,000.00 0.00 Implementati 2017-09-15 2017-09-29 2017-11-10 2017-12-22 2018-01-12 2019-01-12 PMO Technical Assistance and Envelope on Institutional Strengthening NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS 01 / Consultancy for Component 3 - Construction Supervision for Implementation Support, Quality And Cost- IBRD / 86140 Prior Open - International 1,100,000.00 0.00 Canceled 2017-07-01 2017-09-29 2017-07-08 2017-08-19 2017-09-30 2017-11-04 2017-12-09 2017-12-30 2019-06-23 Civil Works Packages in first Technical Assistance and Based Selection 18 months Institutional Strengthening Component 3 - CS 02 / Consultancy for Implementation Support, Quality And Cost- environmental and social IBRD / 86140 Post Open - International 615,000.00 269,324.15 Signed 2017-07-01 2018-01-12 2017-07-08 2018-01-17 2017-08-19 2018-06-25 2017-09-30 2018-08-07 2017-11-04 2018-10-19 2017-12-09 2018-11-21 2017-12-30 2018-12-28 2021-12-30 Technical Assistance and Based Selection monitoring Institutional Strengthening Component 3 - Consultant CS 06 / Consultancy M&E of Implementation Support, IBRD / 86140 Post Qualification Open - National 250,000.00 231,712.46 Signed 2017-11-15 2018-03-21 2017-11-22 2018-03-22 2018-01-31 2018-08-10 2018-02-14 2018-09-20 2018-02-28 2018-10-15 2021-12-30 project result indicators Technical Assistance and Selection Institutional Strengthening Component 3 - CS 11 / Technical assistance Consultant Implementation Support, for Information - Education - IBRD / 86140 Post Qualification Open - National 200,000.00 125,121.29 Signed 2017-08-15 2018-02-08 2017-08-22 2018-03-22 2017-10-31 2018-06-14 2017-11-21 2018-08-07 2017-12-05 2018-09-21 2021-12-30 Technical Assistance and Communication (IEC) Selection Institutional Strengthening CS 03 / Consultancy for preparing design, cost estimate in next phase of the Component 3 - project. Selection of bidder for Implementation Support, Quality And Cost- IBRD / 86140 Prior Open - International 8,807,500.00 5,639,216.76 Signed 2017-07-15 2017-10-02 2017-07-22 2018-02-03 2017-09-02 2018-06-20 2017-10-14 2018-08-06 2017-11-18 2019-03-11 2017-12-23 2019-09-03 2018-01-13 2019-09-10 2021-12-30 construction, equipment in Technical Assistance and Based Selection next phase of the Project. Institutional Strengthening construction supervision for works items in next phase Component 3 - CS 04 / Independent Consultant Implementation Support, Financial Audit for 2017- IBRD / 86140 Post Qualification Open - National 250,000.00 34,559.76 Signed 2017-10-05 2018-01-05 2017-10-12 2018-01-17 2017-12-21 2018-05-03 2018-01-11 2018-06-20 2018-01-25 2018-06-29 2020-05-30 Technical Assistance and 2019 Selection Institutional Strengthening CS01 / consultancy for Component 3 - Consultant construction supervision for Implementation Support, IBRD / 86140 Post Qualification Open - National 274,000.00 170,418.31 Signed 2018-01-17 2018-01-11 2018-01-24 2018-01-17 2018-04-04 2018-05-03 2018-04-18 2018-06-22 2018-05-09 2018-06-29 2019-10-31 civil works packages in firts Technical Assistance and Selection 18 months Institutional Strengthening Component 3 - CS14 / Consultancy for Implementation Support, Quality And Cost- Pending capacity building of Operation IBRD / 86140 Post Open - International 533,990.00 0.00 2022-05-01 2022-05-08 2022-06-19 2022-07-31 2022-08-30 2022-10-04 2022-11-08 2024-05-01 Technical Assistance and Based Selection Implementation and management units Institutional Strengthening Component 3 - CS15 / Independent Financial Consultant Implementation Support, Pending Audit Consultant for period IBRD / 86140 Post Qualification Open - National 31,980.00 0.00 2021-06-04 2021-06-07 2021-07-12 2021-07-19 2021-07-29 2024-01-15 Technical Assistance and Implementation 2020 – 2022 Selection Institutional Strengthening INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3 - CS 08 / National Individual Individual Implementation Support, Pending consultant for Electro- IBRD / 86140 Post Consultant Open 35,000.00 0.00 2018-03-31 2018-05-05 2018-05-12 2018-05-26 2021-12-30 Technical Assistance and Implementation Mechanical Equipment Selection Institutional Strengthening Component 3 - Individual CS 09 / National Individual Implementation Support, Pending IBRD / 86140 Post Consultant Open 100,000.00 0.00 2018-03-31 2018-05-05 2018-05-12 2018-05-26 2021-12-30 consultant on Civil Works Technical Assistance and Implementation Selection Institutional Strengthening Component 3 - CS 10 / National Individual Individual Implementation Support, Pending consultant on Water IBRD / 86140 Post Consultant Open 100,000.00 0.00 2018-03-31 2018-05-05 2018-05-12 2018-05-26 2021-12-30 Technical Assistance and Implementation Resources & Irrigation Selection Institutional Strengthening Component 3 - Individual CS 05-1 / National Implementation Support, Pending IBRD / 86140 Post Consultant Open 100,000.00 0.00 2017-10-15 2017-11-12 2017-11-26 2017-12-17 2021-03-31 Procurement Consultant Technical Assistance and Implementation Selection Institutional Strengthening Component 3 - Individual CS 05-2 / International Implementation Support, Pending IBRD / 86140 Post Consultant Open 165,920.00 0.00 2018-10-02 2018-11-06 2018-11-13 2018-11-27 2019-11-22 Procurement Adviser Technical Assistance and Implementation Selection Institutional Strengthening Page 2 PROCUREMENT PLAN (Textual Part) Project information: RWANDA Second Rwanda Urban Development Project 2 (P165017) Project Implementation agency: Local Administrative Entities Development Agency Date of the Procurement Plan: January 5, 2021 Period covered by this Procurement Plan: January 5, 2021-June 5, 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Rwanda Public Procurement Law, “Law governing public procurement N°62/2018 of 25/08/2018”, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing is not applicable for those contracts identified in the Procurement Plan tables. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is not applicable for those contracts identified in the Procurement Plan tables. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. None PROCUREMENT Rwanda : Second Rwanda Urban Development Project PLAN General Information Country: Rwanda Bank’s Approval Date of the Original Procurement Plan: 2021-04-03 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165017 GPN Date: Project Name: Second Rwanda Urban Development Project Loan / Credit No: IDA / 67890 Ministry of Infrastructure Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-MININFRA-224114-CS- QCBS / TA for development Institutional Capacity Quality And Cost- Pending and installation of IDA / 67890 Development and Project Post Open - International 750,000.00 0.00 2021-07-20 2021-08-10 2021-09-23 2021-10-21 2021-11-20 2021-12-25 2022-01-29 2023-07-30 Based Selection Implementation urbanization monitoring Management information system RW-MININFRA-224116-CS- Institutional Capacity QCBS / Technical assistance Quality And Cost- Pending IDA / 67890 Development and Project Post Open - International 300,000.00 0.00 2021-09-16 2021-10-07 2021-11-20 2021-12-18 2022-01-17 2022-02-21 2022-03-28 2023-03-28 on development of the Based Selection Implementation Management National Housing Strategy RW-MININFRA-224121-CS- QCBS / Technical Assistance to conduct Feasibility studies Institutional Capacity Quality And Cost- Pending in the City of Kigali and IDA / 67890 Development and Project Post Open - International 800,000.00 0.00 2021-09-22 2021-10-13 2021-11-26 2021-12-24 2022-01-23 2022-02-27 2022-04-03 2023-07-30 Based Selection Implementation development of the National Management Strategy for Sites and services strategy RW-MININFRA-224125-CS- QCBS / Technical Assistance Institutional Capacity Quality And Cost- Pending for Piloting feasibility studies IDA / 67890 Development and Project Post Open - International 700,000.00 0.00 2021-11-09 2021-11-30 2022-01-13 2022-02-10 2022-03-12 2022-04-16 2022-05-21 2023-08-30 Based Selection Implementation for Sites and Services in six Management Secondary Cities RW-MININFRA-224127-CS- QCBS / Technical assistance for implementation of the National strategy for Solid Institutional Capacity Waste Management(SWM) by Quality And Cost- Pending IDA / 67890 Development and Project Post Open - International 800,000.00 0.00 2022-02-22 2022-03-15 2022-04-28 2022-05-26 2022-06-25 2022-07-30 2022-09-03 2023-09-03 conducting feasibility studies Based Selection Implementation Management and DEDs for disposal facilities in 3 Satellite Cities (Rwamagana, Bugesera and Muhanga) RW-MININFRA-237499-CS- Institutional Capacity QCBS / Project Quality And Cost- Pending IDA / 67890 Development and Project Post Open - National 100,000.00 0.00 2021-06-02 2021-06-02 2021-07-02 2021-07-02 2021-07-02 2021-08-01 2021-09-05 2022-09-05 implementation completion Based Selection Implementation Management report for RUDP 1 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-MININFRA-224113-CS- INDV / Review of national Institutional Capacity Individual urbanization policy (NUP) and Pending IDA / 67890 Development and Project Post Consultant Open 300,000.00 0.00 2021-07-14 2021-09-01 2021-09-22 2021-10-27 2022-04-25 development of its Implementation Management Selection implementation strategy and action plan Page 1 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan May 29, 2015 2. Date of General Procurement Notice: July 25, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year June 2016 to December 2018. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Prior Review Comments Method Threshold US$ 1. ICB and LIB (Goods) All 2. NCB (Goods) Above US$ 2,000,000 3. ICB (Works) All 4. NCB (Works) Above US$ 10,000,000 2. Pre-qualification. Not applicable. 3. Reference to (if any) Project Operational/Procurement Manual: June 2, 2015. 4. Any Other Special Procurement Arrangement: None 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref Description Estimat Packa Domesti Review Comments . ed ges c by Bank No. Cost Prefere (Prior / US$ nce Post) million (yes/no) 1 Summary of 2.61 12 No Prior/Post the NCB (Works) 2 Summary of 4.50 25 No Prior/Post the NCB (Goods) 3 Summary of 1.06 18 No Post Shopping packages (Goods, March 29, 2017 Works and Non- Consulting Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$1,000,000 2. Single Source (Firms) For SSS, USD50,000 (Para 3.9 of Consultant Guidelines, January 2011) and all other SSS contracts. 3. Individual Individuals ≥ USD 0.3 million; and for essential assignments (procurement / legal consultant). For SSS, USD20,000 (Para 5.6 of Consultant Guidelines, January 2011) 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not applicable. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Descriptio Estimat Package Review Comment n of ed s by s Assignme Cost Bank nt US$ (Prior / million Post) Summary 1.40 1 Prior QCBS of number of contracts that will be let under QCBS March 29, 2017 Summary 8.14 88 Prior/Po CQS/IC of number st of contracts that will be let under other methods March 29, 2017 PROCUREMENT Vietnam : Sustainable Agriculture Transformation Project PLAN General Information Country: Vietnam Bank’s Approval Date of the Original Procurement Plan: 2016-08-24 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145055 GPN Date: 2016-07-25 Project Name: Sustainable Agriculture Transformation Project Loan / Credit No: IDA / 57040 L Executing Agency(ies): ong An Province Project Management Unit WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component B: Supporting XL04 / Civil works for DARD Single Stage - One 2017-12- IDA / 57040 Sustainable Rice-Based Prior Request for Bids Open - National 205,000.00 0.00 Canceled 2017-03-10 2017-03-15 2017-04-26 2017-05-26 2017-06-30 and revelant departments Envelope 27 Systems Component B: Supporting XL-04 / Civil works for DARD Single Stage - One 2018-02- IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 205,000.00 0.00 Canceled 2017-03-10 2017-03-15 2017-04-26 2017-05-26 2017-06-30 and revelant departments Envelope 28 Systems Component B: Supporting XL 04 / Civil works for DARD Request for Single Stage - One 2018-07- IDA / 57040 Sustainable Rice-Based Post Open - National 178,000.00 151,102.09 Signed 2017-12-06 2018-01-31 2018-03-23 and revelant departments Quotations Envelope 10 Systems XLHTX 01-BH / Building Component B: Supporting Request for Single Stage - One 2019-03- infrastructure for Binh Hoa IDA / 57040 Sustainable Rice-Based Post Open - National 177,000.00 129,183.34 Completed 2018-09-30 2018-11-25 2019-02-01 Quotations Envelope 25 cooperative Systems XLHTX 02-HT / Building Component B: Supporting Single Stage - One 2019-08- infrastructure for Huong IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 236,000.00 174,937.15 Completed 2018-09-25 2018-11-13 2018-09-30 2018-10-30 2018-12-18 2018-11-29 2019-04-03 2018-12-24 2019-04-24 Envelope 21 Trang cooperative Systems XLHTX 03 -GG / Construction Component B: Supporting Request for Single Stage - One 2019-05- of infrastructure for Go Gon IDA / 57040 Sustainable Rice-Based Post Open - National 58,291.00 51,587.59 Completed 2019-01-09 2019-02-22 2019-07-03 Quotations Envelope 23 Agricultural Cooperative Systems XLHTX 04-HP / Construction Component B: Supporting Single Stage - One 2019-12- of infrastructure for Hung Phu IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 398,755.00 379,570.40 Signed 2019-01-10 2019-04-19 2019-01-15 2019-02-26 2019-05-24 2019-03-28 2019-06-04 2019-04-22 2019-07-04 Envelope 18 Agricultural Cooperative Systems XLHTX 05-DD / Construction Component B: Supporting Single Stage - One 2019-12- of infrastructure for Dong IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 316,444.00 296,321.98 Signed 2019-01-10 2019-04-19 2019-01-15 2019-02-26 2019-05-24 2019-03-28 2019-06-19 2019-04-22 2019-07-05 Envelope 18 Dung Agricultural Cooperative Systems XLHTX06-CT / Building Component B: Supporting Single Stage - One 2020-11- infrastructure for Cay Trom IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 401,719.00 338,657.13 Signed 2019-08-15 2019-08-29 2019-08-20 2019-10-01 2019-10-04 2019-10-31 2019-11-17 2019-12-05 2019-12-18 Envelope 29 Cooperative Systems XLHTX 07-TH / Building Component B: Supporting Single Stage - One 2020-11- infrastructure for Thanh Hung IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 300,330.00 254,053.37 Signed 2019-08-15 2019-08-21 2019-08-20 2019-10-01 2019-09-30 2019-10-31 2019-11-17 2019-12-05 2019-12-13 Envelope 29 Cooperative Systems XLHTX 08-HTT / Building Component B: Supporting Single Stage - One 2020-11- infrastructure for Hau Thanh IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 358,961.00 301,455.79 Signed 2019-08-15 2019-08-29 2019-08-20 2019-10-01 2019-10-04 2019-10-31 2019-12-09 2019-12-05 2019-12-16 Envelope 29 Tay Cooperative Systems XLHTX 09-HT / Building Component B: Supporting Single Stage - One 2020-11- infrastructure for Hung Tan IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 434,292.00 351,935.26 Signed 2019-08-15 2019-08-23 2019-08-20 2019-10-01 2019-09-30 2019-10-31 2019-11-12 2019-12-05 2019-12-06 Envelope 29 Cooperative Systems XLHTX 10-TL / Building Component B: Supporting Single Stage - One 2020-12- infrastructure for Tan Long IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 358,133.00 324,021.45 Completed 2020-07-22 2020-08-04 2020-07-27 2020-08-26 2020-09-05 2020-09-16 2020-09-14 2020-10-07 2020-09-28 Envelope 31 Cooperative Systems XLHTX 11-VT / Building Component B: Supporting Single Stage - One 2020-12- infrastructure for Vinh Thuan IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 311,377.00 295,596.85 Completed 2020-07-22 2020-08-04 2020-07-27 2020-08-26 2020-09-05 2020-09-16 2020-09-14 2020-10-07 2020-09-28 Envelope 31 cooperative Systems XL01-GHLA / Upgrading and reinforcing the dyke of Cai Bat National canal in combination with Component B: Supporting Procurement Pending Single Stage - One 2022-05- rural transportation for IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 522,820.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 Envelope 19 sustainable rice production in Systems Envelope process ion Thanh Hung and Hung Dien B (Non Bank-SPD) commune, Tan Hung district XL02-GHLA / Upgrading and reinforcing the North bank National dyke of Vam Co Tay river in Component B: Supporting Procurement Pending combination with rural Single Stage - One 2022-05- IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 576,802.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 transportation for sustainable Envelope 19 Systems Envelope process ion rice production in Vinh Binh (Non Bank-SPD) and Tuyen Binh Tay commune, Vinh Hung district XL03-GHLA / Upgrading and reinforcingthe Dyke of Lo National Gach river in combination with Component B: Supporting Procurement Pending Single Stage - One 2022-05- rural transportation for IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 484,262.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 Envelope 19 sustainable rice production in Systems Envelope process ion Vinh Thuan commune, Vinh (Non Bank-SPD) Hung town, Vinh Hung district XL04-GHLA / Upgrading and reinforcing the West bank National dyke of 3 Xa canal in Component B: Supporting Procurement Pending combination with rural Single Stage - One 2022-05- IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 579,948.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 transportation for sustainable Envelope 19 Systems Envelope process ion rice production in Binh Hiep (Non Bank-SPD) and Thanh Tri commune, Kien Tuong town Page 1 XL05-GHLA / Upgrading and reinforcing the East bank dyke National of 30/4 canal in combination Component B: Supporting Procurement Pending Single Stage - One 2022-05- with rural transportation for IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 552,196.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 Envelope 19 sustainable rice production in Systems Envelope process ion Thanh Hung commune and (Non Bank-SPD) Ward 3, Kien Tuong town National XL06-GHLA / Construction of Component B: Supporting Procurement Pending Cay Keo irrigation pump Single Stage - One 2022-05- IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 239,040.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 station in Binh Hiep Envelope 19 Systems Envelope process ion commune, Kien Tuong town (Non Bank-SPD) XL07-GHLA / Upgrading and reinforcing the East bank dyke National of Duong Bang canal in Component B: Supporting Procurement Pending combination with rural Single Stage - One 2022-05- IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 552,044.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 transportation for sustainable Envelope 19 Systems Envelope process ion rice production in Binh Hoa (Non Bank-SPD) Dong and Binh Hoa Trung commune, Moc Hoa district XL08-GHLA / Upgrading and reinforcing the North bank National dyke of Don Dong canal in Component B: Supporting Procurement Pending combination with rural Single Stage - One 2022-05- IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 482,943.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 transportation for sustainable Envelope 19 Systems Envelope process ion rice productionin Binh Hoa (Non Bank-SPD) Tay and Binh Hoa Trung commune, Moc Hoa district XL09-GHLA / Upgrading and reinforcing the South bank National dyke of 7 Thuoc canal in Component B: Supporting Procurement Pending combination with rural Single Stage - One 2022-05- IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 548,340.00 0.00 Implementat 2021-06-10 2021-06-15 2021-07-15 2021-07-29 2021-08-22 transportation for sustainable Envelope 19 Systems Envelope process ion rice production in Bac Hoa (Non Bank-SPD) and Hau Thanh Tay commune, Tan Thanh district XL10-GHLA / construction of Component B: Supporting Request for Pending Bui Thang irrigation pump Request for Single Stage - One 2022-04- IDA / 57040 Sustainable Rice-Based Post Open - National Quotations (Non 187,344.00 0.00 Implementat 2021-06-15 2021-07-30 stationin Nhon Hoa Lap Quotations Envelope 26 Systems Bank-SPD) ion commune, Tan Thanh district XL11-GHLA / Upgrading and reinforcing the dyke of Quan National canal and 2000 Bac canal in Component B: Supporting Procurement Pending combination with Single Stage - One 2022-06- IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National Document - 1 522,567.00 0.00 Implementat 2021-06-30 2021-07-05 2021-08-04 2021-08-18 2021-09-11 transportation for sustainable Envelope 08 Systems Envelope process ion rice production in Hau Thanh (Non Bank-SPD) Dong and Hau Thanh Tay commune, Tan Thanh district XL12-GHLA / Construction of Component B: Supporting Request for Pending Tan Dong Tien irrigation Request for Single Stage - One 2022-05- IDA / 57040 Sustainable Rice-Based Post Open - National Quotations (Non 171,644.00 0.00 Implementat 2021-07-05 2021-08-19 pump station in Tan Lap Quotations Envelope 16 Systems Bank-SPD) ion commune, Tan Thanh district GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component D: Project Single Stage - One HH07 / Office equipment IDA / 57040 Prior Request for Bids Open - National 210,000.00 126,134.79 Signed 2016-09-01 2016-10-12 2016-09-06 2016-10-26 2016-11-30 2016-11-10 2017-02-13 2016-12-04 2017-02-22 2017-03-06 Management Envelope Component B: Supporting HH08 / Communication Single Stage - One IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 120,000.00 57,846.53 Completed 2016-10-01 2018-05-25 2016-10-06 2016-11-17 2018-07-03 2016-12-17 2018-07-23 2017-01-21 2018-10-17 2018-04-20 2019-10-18 materials Envelope Systems HH-09 / Specialized Component B: Supporting Single Stage - One equipment for provintical IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 150,000.00 0.00 Canceled 2017-08-20 2019-09-04 2017-08-25 2017-10-06 2019-10-10 2017-11-05 2017-12-10 2018-03-10 Envelope seed center Systems VN-PMU LONG AN-16059- Component B: Supporting GO-RFB / Specialized Single Stage - One IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 100,000.00 0.00 Canceled 2017-03-25 2017-03-30 2017-05-11 2017-06-10 2017-07-15 2017-11-15 equipment for provintical Envelope Systems seed center HH09 / Specialized Component B: Supporting Single Stage - One equipment for provintical IDA / 57040 Sustainable Rice-Based Post Request for Bids Open - National 100,000.00 0.00 Canceled 2017-03-25 2017-03-30 2017-05-11 2017-06-10 2017-07-15 2017-11-15 Envelope seed center Systems HH-09-2 / Specialized Component B: Supporting Request for Single Stage - One equipment for provincial seed IDA / 57040 Sustainable Rice-Based Post Open - National 96,000.00 0.00 Canceled 2019-12-23 2020-02-17 2020-06-26 Quotations Envelope center Systems Component B: Supporting HH-08-2 / Communication Request for Single Stage - One IDA / 57040 Sustainable Rice-Based Post Open - National 29,000.00 26,004.68 Signed 2020-05-30 2020-07-19 2020-09-14 2020-11-16 materials 2020 Quotations Envelope Systems HH-09-3 / Specialized Component B: Supporting Request for Single Stage - One equipment for the Provincial IDA / 57040 Sustainable Rice-Based Post Open - National 96,000.00 90,378.97 Completed 2020-09-18 2020-10-15 2020-11-02 2020-12-31 2020-12-21 Quotations Envelope Seed Center Systems NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Page 2 Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CQS31 / Independent Component B: Supporting Consultant asssessment of farmer IDA / 57040 Sustainable Rice-Based Prior Qualification Open - National 100,000.00 0.00 Canceled 2016-11-01 2016-11-22 2017-01-05 2017-02-04 2017-03-11 2020-06-30 adoption Systems Selection CQS-31 / Independent Component B: Supporting Consultant asssessment of farmer IDA / 57040 Sustainable Rice-Based Post Qualification Open - National 100,000.00 84,915.36 Signed 2016-12-20 2017-04-17 2017-01-10 2017-02-23 2017-07-20 2017-03-25 2017-11-22 2017-04-29 2017-11-29 2020-06-30 adoption Systems Selection Component B: Supporting Consultant IC30 / Nat. Consultant on IDA / 57040 Sustainable Rice-Based Post Qualification Open - National 60,000.00 0.00 Canceled 2016-09-15 2016-10-06 2016-11-19 2016-12-19 2017-01-23 2020-06-30 communication strategy Systems Selection Consultant Component D: Project IC32 / Technical consultant IDA / 57040 Post Qualification Open - National 120,000.00 0.00 Canceled 2016-09-15 2016-10-06 2016-11-19 2016-12-19 2017-01-23 2020-06-30 Management Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 Contract Value Prior Review Threshold (US$ Expenditure Category Threshold(US$ Procurement Method thousands) thousands) Goods and Non- >=10,000 ICB ALL Consulting Services <10,000 NCB >=USD4,000 <500 Shopping No prior review. -- Framework Agreement First contract and all contracts valued >=USD4,000 -- Direct Contracting >=USD4,000 Consultants Services >=300 QCBS/QBS >=USD2,000 <300 CQS No prior review. Single-Source Selection >=USD1,000 (firm) Individual Consultant and >=400 SSS Individual PROCUREMENT China : Building a Modern Fiscal System Technical Assistance PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-05-18 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154694 GPN Date: Project Name: Building a Modern Fiscal System Technical Assistance Loan / Credit No: IBRD / 86160 Fiscal TA2 Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CN-FISCAL TA2-72328-NC- RFQ / Department of Personnel and Education, Key elements of China's Request for Single Stage - One Ministry of Finance is to hire a IBRD / 86160 Post Open - National 10,000.00 6,959.78 Signed 2018-08-01 2018-08-03 2018-08-02 2018-08-12 public finance system Quotations Envelope company to print the five resports delivered by the consulting service company SZS201802-4 / The service is to procure a company to print Key elements of China's Request for Single Stage - One the research output of the real IBRD / 86160 Post Open - National 3,000.00 3,000.00 Signed 2019-02-18 2019-02-22 2019-01-28 2019-02-22 public finance system Quotations Envelope estate tax base evaluation system construction GJZX-2019-02 / The service is to procure a company to translate the research results of the study on the Key elements of China's Request for Single Stage - One IBRD / 86160 Post Open - National 5,000.00 4,900.00 Signed 2019-02-18 2019-02-22 2019-02-15 2019-03-15 operational mechanism of public finance system Quotations Envelope cadre education and training oriented to the needs of fiscal and taxation system reform. GSS-2019-01 / The service is to procure a company to print fourteen reserch reports Fiscal Policy and Sustainable Request for Single Stage - One delivered by the two IBRD / 86160 Post Open - National 35,000.00 31,515.73 Signed 2019-04-09 2019-04-27 2019-07-10 2019-06-08 Development Quotations Envelope consulting firms under the subproject of Department of Customs. GJZX-2019-03 / The service is to proucre a publishing house to publish and pirnt the Key elements of China's Request for Single Stage - One IBRD / 86160 Post Open - National 23,480.00 18,806.00 Signed 2019-05-01 2019-05-10 2019-05-17 2019-06-13 research results of the public finance system Quotations Envelope subproject of Cadre Education Center, MOF. KJS-2019-01 / The service is to procure a printing company to print the International Key elements of China's Request for Single Stage - One Public Sector Accounting IBRD / 86160 Post Open - National 6,075.00 2,169.52 Signed 2019-08-02 2019-08-24 2019-08-27 2019-10-05 public finance system Quotations Envelope Proclamation Manual (2018) for Accounting Department, MOF. XXZX-2019-01 / The Information Center,MOF is to Key elements of China's Request for Single Stage - One to procure a printing IBRD / 86160 Post Open - National 5,000.00 4,923.80 Signed 2019-09-29 2019-10-10 2019-10-14 2019-10-20 public finance system Quotations Envelope company to print the research results of its subproject. ZCS-2020-01 / The Department of Assets Management, MOF is to hire a Key elements of China's Request for Single Stage - One publishing firm to publish the IBRD / 86160 Post Open - National 8,000.00 0.00 Canceled 2020-05-20 2020-05-31 2020-06-12 public finance system Quotations Envelope research reports delivered by the consulting firm under its subproject. IEFI-2020-01 / The International Economics and Finance Institute is to procure Fiscal Policy and Sustainable Request for Single Stage - One IBRD / 86160 Post Open - National 5,000.00 4,451.24 Signed 2020-09-12 2020-09-21 2020-10-10 2020-10-19 a printing house to print the Development Quotations Envelope research reports under its subproject. TFS-2020-02 / The Legal Department of MOF is to Key elements of China's Request for Single Stage - One procure a printing house to IBRD / 86160 Post Open - National 25,800.00 16,235.26 Signed 2020-12-03 2020-12-31 2020-12-23 2021-04-12 public finance system Quotations Envelope print the deliverables under the Sub-project of A07- 2017. KJZZW-2021-01 / China Accounting Standards Committee, MOF is to Fiscal Policy and Sustainable Request for Single Stage - One IBRD / 86160 Post Open - National 5,150.00 4,800.00 Signed 2021-03-24 2021-04-02 2021-05-25 2021-06-18 translate the key research Development Quotations Envelope outputs into English under its subproject B08-2018. Page 1 KJZZW-2021-02 / The service is to procure a printing company to print the Fiscal Policy and Sustainable Request for Single Stage - One IBRD / 86160 Post Open - National 25,000.00 9,950.56 Signed 2021-06-02 2021-06-08 2021-06-07 2021-06-18 outputs under the subproject Development Quotations Envelope of China Accounting Standards Committee(B08- 2018). CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CN-FISCAL TA2-66280-CS- CQS / To carry out research on the international development models and trends of CPA industry, Consultant Key elements of China's evaluate the current IBRD / 86160 Post Qualification Open - National 23,000.00 23,000.00 Signed 2018-06-12 2018-06-13 2018-07-10 2018-07-19 2018-08-10 2018-08-05 2018-09-30 2018-10-22 2018-10-20 2018-10-08 2019-10-01 public finance system conditions of China, and Selection propose the suitable development&supervision models for CPA industry in China ultimately. FISCAL TA2-IEFI-02 / The consulting service is to hire a consulting firm to carry out research on the development Consultant Fiscal Policy and Sustainable and integration of the Asia- IBRD / 86160 Post Qualification Open - National 47,000.00 47,000.00 Signed 2018-08-21 2018-09-03 2018-09-17 2018-11-09 2018-11-13 2018-11-12 2018-11-23 2019-01-23 2018-12-28 2018-12-12 2020-02-28 Development pacific economic cooperation Selection mechanism and China's countermeasures In the next five years. FISCAL TA2-IEFI-03 / The consulting service is to hire a consulting firm to carry out Consultant research on the cooperation Fiscal Policy and Sustainable IBRD / 86160 Post Qualification Open - National 47,000.00 47,000.00 Signed 2018-08-21 2018-09-03 2018-09-17 2018-11-09 2018-11-13 2018-11-13 2018-11-23 2018-12-03 2018-12-28 2018-12-10 2020-02-28 of new multilateral Development Selection development agencies and existing multilateral development agencies. FISCAL TA2-IEFI-04 / The consulting service is to hire a consulting firm to carry out Consultant Fiscal Policy and Sustainable research on Strategic IBRD / 86160 Post Qualification Open - National 47,000.00 47,000.00 Signed 2018-08-21 2018-09-03 2018-09-17 2018-11-09 2018-11-13 2018-11-13 2018-11-23 2018-12-10 2018-12-28 2018-12-10 2020-02-28 Development cooperation between China Selection and OECD in the next five years. FISCAL TA2-IEFI-05 / The consulting service is to hire a Consultant consulting firm to carry out Fiscal Policy and Sustainable IBRD / 86160 Post Qualification Open - National 47,700.00 47,700.00 Signed 2018-08-21 2018-09-03 2018-09-17 2018-11-13 2018-11-13 2018-11-23 2019-01-23 2018-12-28 2018-12-28 2020-02-28 research on development of Development Selection the international financial and economic think tank system. ZYSGJC-2018-01 / The consulting service is to hire a cousulting firm to carry out Consultant Fiscal Policy and Sustainable research on the development IBRD / 86160 Post Qualification Open - National 60,000.00 60,000.00 Signed 2018-12-11 2018-12-14 2019-01-15 2019-02-04 2019-02-20 2019-03-10 2019-05-22 2019-03-25 2019-05-14 2020-03-25 Development trends and prospects of the Selection International investment and trade rules KJZZW-01 / The consulting service is to hire a consulting firm to carry out research on Consultant the study and formulation on Fiscal Policy and Sustainable IBRD / 86160 Post Qualification Open - National 210,000.00 210,000.00 Signed 2019-02-15 2019-02-15 2019-03-14 2019-04-05 2019-04-02 2019-05-15 2019-05-20 2019-06-19 2019-05-20 2020-06-18 the accounting standards for Development Selection carbon emission trading of China in the context of green development ZYSGJC-2019-01 / The consulting service it to porcure a consulting firm to Consultant carry out research on the Fiscal Policy and Sustainable IBRD / 86160 Post Qualification Open - National 60,000.00 60,000.00 Signed 2019-03-04 2019-03-01 2019-03-24 2019-04-13 2019-04-19 2019-05-17 2019-05-22 2019-05-31 2019-05-14 2020-05-31 evolution trend of global Development Selection economic governance structure and China's strategic choice ZYSGJC-2019-02 / The consulting service is to Consultant procure a consulting firm to Fiscal Policy and Sustainable IBRD / 86160 Post Qualification Open - National 45,000.00 45,000.00 Signed 2019-03-04 2019-03-01 2019-03-24 2019-04-13 2019-05-22 2019-05-17 2019-07-29 2019-05-31 2019-07-29 2020-05-31 carry out research on China's Development Selection position and promotion strategy in global value chain SZS-2019-01 / To procure a consulting firm to carry out Consultant research on the Key elements of China's IBRD / 86160 Post Qualification Open - National 290,000.00 290,000.00 Signed 2019-03-11 2019-03-12 2019-03-25 2019-04-12 2019-04-04 2019-05-22 2019-05-14 2019-06-07 2019-05-27 2020-05-20 implementation evaluation public finance system Selection and system improvement of environmental protection tax SZS-2019-02 / To procure a consulting firm to carry out research on design and Consultant implementation effect Key elements of China's IBRD / 86160 Post Qualification Open - National 60,000.00 60,000.00 Signed 2019-03-11 2019-03-12 2019-03-25 2019-04-12 2019-04-04 2019-05-22 2019-05-14 2019-06-07 2019-05-27 2020-05-20 comparison of environmental public finance system Selection protection tax system in representative countries or regions ZHS-2019-01 / The consulting service is to hire a Consultant consulting firm oto carry out Fiscal Policy and Sustainable IBRD / 86160 Post Qualification Open - National 250,000.00 250,000.00 Signed 2019-04-11 2019-04-10 2019-04-30 2019-05-08 2019-05-20 2019-06-08 2019-12-24 2019-06-21 2019-11-29 2020-11-09 studies on economic growth Development Selection drivers, space and strategic issues of China Page 2 GKS-2019-01 / The service is to proucre a consulting firm Consultant to carry put research on Key elements of China's IBRD / 86160 Post Qualification Open - National 217,000.00 217,000.00 Signed 2019-08-26 2019-08-28 2019-09-06 2019-10-10 2020-01-07 2019-11-16 2020-04-01 2019-11-30 2020-04-09 2021-03-29 Operation Mechanism of public finance system Selection Modern Treasury Revenue and Expenditure SBS-2020-01 / The consulting service is to procure a consulting firm to Consultant Fiscal Policy and Sustainable carry out research on IBRD / 86160 Post Qualification Open - National 259,600.00 259,600.00 Signed 2020-03-17 2020-05-12 2020-03-30 2020-05-13 2020-05-25 2020-06-12 2020-06-17 2020-07-17 2020-06-17 2021-06-09 Development Improving Enrolling Selection Mechanism of Basic Health Insurance SBS-2020-02 / The Consultant consulting service is to hire a Fiscal Policy and Sustainable IBRD / 86160 Post Qualification Open - National 20,000.00 20,000.00 Signed 2020-04-20 2020-05-12 2020-05-03 2020-05-11 2020-05-25 2020-06-10 2020-06-17 2020-06-19 2020-06-16 2021-06-09 consulting firm to carry out Development Selection M&E work for the sub-project. GKS-A17-2020 / The consulting service is to hire a consulting firm to carry out Consultant Key elements of China's research on the IBRD / 86160 Post Qualification Open - National 213,000.00 213,000.00 Signed 2020-04-20 2020-05-12 2020-05-04 2020-05-14 2020-06-03 2020-06-13 2020-06-17 2020-06-20 2020-06-17 2021-06-10 public finance system implementation plan of fiscal Selection target balance management system. ZHS-B10-2020-01 / The consulting service is to carry Consultant Fiscal Policy and Sustainable out research on the fiscal IBRD / 86160 Post Qualification Open - National 170,000.00 170,000.00 Signed 2020-04-20 2020-05-12 2020-05-04 2020-05-16 2020-08-25 2020-06-15 2021-01-14 2020-06-26 2021-01-27 2021-07-09 Development policy of ecological civilization Selection construction. ZHS-B10-2020-02 / The consulting service is to carry out research on fiscal policies Consultant Fiscal Policy and Sustainable for integrated protection, IBRD / 86160 Post Qualification Open - National 70,000.00 70,000.00 Signed 2020-04-20 2020-05-12 2020-05-04 2020-05-16 2020-08-25 2020-06-15 2021-01-14 2020-06-26 2021-01-27 2021-07-09 Development restoration and management Selection of mountains, rivers, forests, fields, lakes and grasses. ZHS-B10-2020-03 / The consulting service is to carry Consultant out research on fiscal policy Fiscal Policy and Sustainable IBRD / 86160 Post Qualification Open - National 70,000.00 70,000.00 Signed 2020-04-24 2020-05-12 2020-05-08 2020-05-20 2020-08-25 2020-06-19 2021-01-14 2020-06-30 2021-01-27 2021-07-09 of nature conservation system Development Selection with national parks as the main body. GKS-A18-2020 / The consulting service is to hire a Consultant consulting firm to carry our Key elements of China's IBRD / 86160 Post Qualification Open - National 237,000.00 237,000.00 Signed 2020-04-24 2020-05-12 2020-05-08 2020-05-18 2020-06-28 2020-06-17 2020-08-03 2020-06-24 2020-07-30 2021-07-08 research on the auditing and public finance system Selection publication framework of government financial reports. TFS-A19-2020 / The consulting service is to carry Consultant Key elements of China's out research on construction IBRD / 86160 Post Qualification Open - National 223,000.00 223,000.00 Signed 2020-04-24 2020-05-12 2020-05-08 2020-05-18 2020-06-05 2020-06-17 2020-08-03 2020-06-24 2020-07-30 2021-07-08 public finance system of the legal system of state- Selection owned assets in China. ZYSZHC-A20-2020 / The consulting service is to carry Consultant Key elements of China's out research on construction IBRD / 86160 Post Qualification Open - National 260,000.00 260,000.00 Signed 2020-04-24 2020-05-12 2020-05-08 2020-05-18 2020-06-05 2020-06-17 2020-07-09 2020-06-24 2020-07-09 2021-05-08 public finance system and application of fiscal Selection development index system. KJS-2020-01 / The consulting service is to procure a consulting firm to Consultant Fiscal Policy and Sustainable Under carry out research on IBRD / 86160 Post Qualification Open - National 239,000.00 0.00 2020-05-25 2020-07-14 2020-06-15 2020-06-24 2020-09-14 2020-07-24 2020-08-02 2021-07-08 Development Implementation improving internal Selection governnance machanism of CPA firms. SBS-2020-03 / The consulting service is to carry Consultant Key elements of China's out research on regional IBRD / 86160 Post Qualification Open - National 190,000.00 210,000.00 Signed 2020-07-14 2020-07-21 2020-07-28 2020-08-07 2020-07-27 2020-09-06 2021-03-26 2020-09-13 2021-03-30 2021-07-20 public finance system health resource allocation Selection standards in China. SBS-2020-04 / The consulting service is to carry Consultant Key elements of China's out research on improvement IBRD / 86160 Post Qualification Open - National 180,000.00 210,000.00 Signed 2020-07-14 2020-07-21 2020-07-28 2020-08-07 2020-07-27 2020-09-06 2021-03-23 2020-09-13 2021-03-30 2021-07-20 public finance system of the China's fiscal health Selection investment policies. YSS-2020-01 / The consulting service is to carry Consultant out International Comparative Key elements of China's Under IBRD / 86160 Post Qualification Open - National 126,600.00 0.00 2020-07-29 2020-07-31 2020-08-20 2020-08-30 2021-01-22 2020-09-29 2021-06-11 2020-10-06 2021-07-20 Study of Budget Disclosure public finance system Implementation Selection Practices and Measurement Criteria. YSS-2020-02 / The consulting service is to carry out International Comparative Consultant Key elements of China's Under Study and Policy IBRD / 86160 Post Qualification Open - National 126,600.00 0.00 2020-07-29 2020-07-31 2020-08-20 2020-08-30 2021-01-27 2020-09-29 2020-10-06 2021-07-20 public finance system Implementation Recommendations on the Selection Legal System of Budget Disclosure. JDPJJ-2020-01 / The consulting service is to carry out research on Innovative Consultant Research on Budget Key elements of China's Under IBRD / 86160 Post Qualification Open - National 67,000.00 0.00 2020-08-21 2020-09-02 2020-09-04 2020-09-14 2020-11-24 2020-10-14 2020-10-21 2021-07-20 Performance Evaluation in the public finance system Implementation Selection Context of Comprehensive Implementing Performance- based Budget Management. Page 3 JDPJJ-2020-02 / The consulting service is to carry Consultant out research on the 14th five- Key elements of China's Under IBRD / 86160 Post Qualification Open - National 66,600.00 0.00 2020-08-21 2020-09-02 2020-09-04 2020-09-14 2020-11-24 2020-10-14 2020-10-21 2021-07-20 year Plan for the development public finance system Implementation Selection of budget performance evaluation. JDPJJ-2020-03 / The consulting service is to carry out research on Research on international comparison and Consultant reference of budget Key elements of China's Under IBRD / 86160 Post Qualification Open - National 145,900.00 0.00 2020-08-21 2020-09-02 2020-09-04 2020-09-14 2020-11-24 2020-10-14 2020-10-21 2021-07-20 performance evaluation and public finance system Implementation Selection mechanism research on the participation of third party institutions in budget performance evaluation. JDPJJ-2020-04 / The consulting service is to Consultant Key elements of China's Under provide support for project IBRD / 86160 Post Qualification Open - National 55,500.00 0.00 2020-08-21 2020-09-02 2020-09-04 2020-09-14 2020-11-24 2020-10-14 2020-10-21 2021-07-20 public finance system Implementation implementation and quality Selection control. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual PMO Procurement Specialist / Key elements of China's IBRD / 86160 Prior Consultant Open 0.00 46,658.10 Canceled 2016-09-26 PMO Procurement Specialist public finance system Selection FISCAL TA2-IEFI-01 / The consulting service is to hire an Individual individual consultant to carry Fiscal Policy and Sustainable IBRD / 86160 Post Consultant Open 9,200.00 9,200.00 Signed 2018-08-21 2018-09-03 2018-10-24 2018-10-15 2018-10-31 2018-11-15 2018-12-03 2018-12-20 2020-04-19 out project management work Development Selection for International Economics and Finance Institute. ZYSGJC-2019-03 / The consulting service is to procure an individual consultant to carry out Individual Fiscal Policy and Sustainable research on transformation of IBRD / 86160 Post Consultant Open 40,000.00 40,000.00 Signed 2019-03-04 2019-03-01 2019-04-13 2019-04-19 2019-04-25 2019-05-22 2019-05-12 2019-05-14 2020-05-12 Development scientific and technological Selection achievements: experience of major economies and China's strategy Page 4 18 MONTHS PROCUREMENT PLAN (Textual Part) Project information: Vietnam Forest Sector Modernization and Coastal Resilience Enhancement Project (P157127) Project Implementation agency: MARD, Provinces of Quang Ninh; Hai Phong; Thanh Hoa; NgheAn; Ha Tinh; Quang Binh; Quang Tri; Thua Thien Hue Date of the Procurement Plan: [Date to beinserted] Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. A. The Bank’s Standard Procurement Documents (SPDs): The Bank’s SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 1. Open Competitive Procurement: When the Recipient uses its own national open competitive procurement arrangements as set forth in (a) Article 20 on Open Bidding of the Recipient’s Law on Procurement No. 43/2013/QH13 dated November 26, 2013 and related provisions necessary to effect the same; and (b) the Recipient’s Decree No. 63/2014/ND-CP dated June 26, 2014 Guiding Implementation of the Law on the Procurement (collectively, “National Procurement Laws”), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (i) No domestic preference over foreign bidders shall be granted to national bidders in bid evaluation, nor shall foreign bidders be asked or required to form joint ventures with or be subcontractors to national bidders in order to submit a bid. (ii) The model bidding documents (harmonized model bidding documents) agreed with the Association shall be used. (iii) No bid shall be eliminated from detailed evaluation on the basis of minor, non-substantive deviations. The evaluation of bidder’s qualifications shall be conducted separately subsequent to the technical and commercial evaluation of the bid. (iv) A bidder shall neither be required nor permitted, as a condition for award, to undertake obligations not specified in the bidding documents or otherwise to modify the bid as originally submitted. (v) No bid shall be rejected on the basis of a comparison with the employer’s estimate and budget ceiling. (vi) The Recipient shall implement an effective mechanism allowing bidders to complaint and have their complaints handled in a timely manner. The complaints mechanism shall allow the submission of anonymous complaints. 2. National Procurement Arrangements Other Than National Open Competitive Procurement: Not applicable. C. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. D. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable. E. Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): Not Applicable. F. Hands-on Expanded Implementation Support (HEIS)as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. G. Other Relevant Procurement Information: Not Applicable. PROCUREMENT Vietnam : Forest Sector Modernization and Coastal Resilience Enhancement Project PLAN General Information Country: Vietnam Bank’s Approval Date of the Original Procurement Plan: 2019-10-01 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157127 GPN Date: 2019-06-04 Project Name: Forest Sector Modernization and Coastal Resilience Enhancement Project Loan / Credit No: IDA / 60790 Q Executing Agency(ies): uang Ninh Provincial Project Management Unit for FMCRP WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FMCR-QN-HH01 / Production and supply of seedling and Coastal Forest Development IDA / 60790 Post Direct Selection Direct 530,000.00 277,657.60 Signed 2019-10-15 2019-10-01 2019-10-25 2020-06-29 2019-11-18 2020-07-10 2022-11-17 supplementary material for and Rehabilitation planting in Year 1 (2020) FMCR-QN-HH02 / Production, supply of Pending Coastal Forest Development seedlings and auxiliary IDA / 60790 Post Direct Selection Direct 750,000.00 0.00 Implementati 2021-06-10 2021-06-20 2021-07-14 2023-12-31 and Rehabilitation materials for forest plantation on 200ha - phase 1, 2021 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FMCR-QN-PTV01 / Measurement and development of community- Coastal Forest Development Single Stage - One IDA / 60790 Post Request for Bids Open - National 474,850.00 0.00 Canceled 2020-01-02 2020-02-01 2020-03-17 2020-04-06 2020-04-16 2020-12-12 based forest management and Rehabilitation Envelope profiles for existing forest areas for communities CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FMCR-QN-TV03 / Planning Consultant and implementation of social IDA / 60790 Project Management and M&E Post Qualification Open - National 288,000.00 283,499.69 Signed 2019-11-10 2020-06-29 2019-11-11 2019-12-11 2020-10-07 2020-01-20 2020-11-11 2020-02-09 2020-12-25 2023-12-02 and environmental safeguards Selection at provincial level FMCR-QN-TV01 / Site survey and design for forest new Consultant Coastal Forest Development plantation and restoration in IDA / 60790 Post Qualification Open - National 214,000.00 147,468.20 Signed 2019-10-15 2020-07-07 2019-10-29 2019-11-28 2021-04-19 2020-01-07 2021-04-25 2020-02-01 2021-04-29 2022-01-31 and Rehabilitation project communes in 2020 Selection and 2021 FMCR-QN-TV02 / Survey and Consultant design for protection Coastal Forest Development Pending IDA / 60790 Post Qualification Open - National 38,000.00 0.00 2020-04-06 2020-04-20 2020-05-20 2020-05-20 2020-06-14 2021-06-14 measures for coastal forest in and Rehabilitation Implementation Selection project communes FMCR-QN-TV09 / Forest Consultant Coastal Forest Development Pending protection survey and design IDA / 60790 Post Qualification Open - National 70,000.00 0.00 2021-06-20 2021-07-05 2021-08-04 2021-08-09 2021-08-14 2021-12-12 and Rehabilitation Implementation under component 2.2 Selection FMCR-QN-TV08 / Measurement and Consultant development of community- Coastal Forest Development Pending IDA / 60790 Post Qualification Open - National 287,500.00 0.00 2021-06-14 2021-06-29 2021-07-19 2021-08-18 2021-08-28 2022-04-25 based forest management and Rehabilitation Implementation Selection profiles for existing forest areas for communities FMCR-QN-TV07 / Consulting service of surveying and design for pilot 01 Consultant Coastal Forest Development Pending infrastructure investment IDA / 60790 Post Qualification Open - National 21,487.00 0.00 2021-06-07 2021-06-22 2021-07-02 2021-08-01 2021-08-16 2021-11-14 and Rehabilitation Implementation package (pilot implemented in Selection 2021) under Subcomponent 3.2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FMCR-QN-TV04 / Design for pilot forest new plantation Coastal Forest Development Under IDA / 60790 Post Direct Selection Direct 16,500.00 0.00 2019-10-10 2019-12-23 2019-10-25 2020-02-15 2019-11-09 2020-01-08 and restoration (150ha) in and Rehabilitation Implementation 2020 Page 1 PROCUREMENT PLAN (Textual Part) Project information: Land Registration and Property Valuation Project (P161238) Project Implementation agency: Public Services Agency, Moldova Date of the Procurement Plan: February 4, 2019 Applicable Regulations: World Bank Procurement Regulations for IPF Borrowers, dated July 2016, revised November 2017 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Law No 131 dated July 3, 2015 as further amended, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables – Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables - Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works) - Not Applicable PROCUREMENT Moldova : Land Registration and Property Valuation Project PLAN General Information Country: Moldova Bank’s Approval Date of the Original Procurement Plan: 2019-02-04 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161238 GPN Date: 2019-06-28 Project Name: Land Registration and Property Valuation Project Loan / Credit No: IDA / 63060 P Executing Agency(ies): ublic Services Agency WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-PSA-122742-GO-RFQ / Land Administration System Request for Single Stage - One Software licenses for valuation IDA / 63060 Post Open - National 4,500.66 Completed 2019-09-07 2019-08-30 2019-11-02 2020-01-24 2021-11-02 2020-02-13 Strengthening Quotations Envelope (SPSS license) MD-PSA-215894-GO-RFQ / Pending Procurement of special paper Request for Single Stage - One IDA / 63060 First Property Registration Post Open - National 0.00 Implementati 2021-02-05 2021-03-26 2021-09-22 for printing property title Quotations Envelope on certificates MD-PSA-210221-GO-RFQ / Pending Land Administration System Request for Single Stage - One IT equipment for PIU and data IDA / 63060 Post Open - National 0.00 Implementati 2020-12-26 2021-04-02 2021-09-29 Strengthening Quotations Envelope collection consultants on MD-PSA-226578-GO-RFB / Pending Land Administration System Single Stage - One ICT Equipment for Piloting IDA / 63060 Post Request for Bids Open - National 0.00 Implementati 2021-04-09 2021-04-14 2021-05-26 2021-06-25 2021-07-30 2022-01-26 Strengthening Envelope Moldlis on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-PSA-120160-NC-RFB / Land Administration System Single Stage - One Completion of the Digital IDA / 63060 Post Request for Bids Open - National 535,636.47 Signed 2019-06-27 2019-09-09 2019-07-12 2019-09-06 2019-08-11 2019-11-11 2019-09-10 2020-01-03 2019-10-15 2020-02-19 2021-04-07 Strengthening Envelope archive MD-PSA-122733-NC-RFQ / Request for Single Stage - One Surveying works Calarasovca, IDA / 63060 First Property Registration Post Open - National 21,765.48 Signed 2019-09-07 2019-09-19 2019-11-02 2019-11-25 2021-10-22 Quotations Envelope Ocnita r-n MD-PSA-124230-NC-RFQ / Request for Single Stage - One Surveying works Dingeni, IDA / 63060 First Property Registration Post Open - National 13,177.75 Signed 2019-09-14 2019-09-19 2019-11-09 2019-11-25 2021-10-29 Quotations Envelope Ocnita r-n MD-PSA-124231-NC-RFQ / Request for Single Stage - One Surveying works Lencauti, IDA / 63060 First Property Registration Post Open - National 16,536.38 Signed 2019-09-14 2019-09-19 2019-11-09 2019-11-25 2021-10-29 Quotations Envelope Ocnita r-n MD-PSA-124233-NC-RFQ / Request for Single Stage - One Surveying works Unguri, IDA / 63060 First Property Registration Post Open - National 10,419.40 Signed 2019-09-14 2019-09-19 2019-11-09 2019-11-25 2021-10-29 Quotations Envelope Ocnita r-n MD-PSA-124234-NC-RFQ / Request for Single Stage - One Surveying works Valcinet, IDA / 63060 First Property Registration Post Open - National 16,357.20 Signed 2019-09-14 2019-09-19 2019-11-09 2019-11-25 2021-10-29 Quotations Envelope Ocnita r-n MD-PSA-124235-NC-RFQ / Request for Single Stage - One Surveying works for 16 IDA / 63060 First Property Registration Post Open - National 120,277.49 Signed 2019-09-14 2019-09-19 2019-11-09 2019-11-25 2021-10-29 Quotations Envelope localities, Ocnita r-n MD-PSA-124248-NC-DIR / IDA / 63060 First Property Registration Post Direct Selection Direct 7,299.21 Completed 2019-10-15 2019-09-02 2019-10-20 2019-07-15 2019-11-24 2019-11-20 2020-05-22 2019-12-13 Data acquisition from IPOT MD-PSA-122748-NC-DIR / Data acquisition from IDA / 63060 First Property Registration Post Direct Selection Direct 7,326.49 Signed 2019-10-15 2019-08-07 2019-10-20 2019-03-15 2019-11-24 2019-11-20 2021-02-12 INGEOCAD Under MD-PSA-149015-NC-RFB / Single Stage - One IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2019-12-13 2019-12-24 2019-12-20 2020-01-02 2020-02-05 2020-02-19 2020-03-06 2020-02-19 2020-04-10 2021-06-30 Surveying Works, Edinet rayon Envelope on Under MD-PSA-160154-NC-DIR / IDA / 63060 First Property Registration Post Direct Selection Direct 0.00 Implementati 2020-02-24 2020-03-06 2020-02-29 2020-03-25 2020-04-04 2020-10-01 Data acquisition from IPOT on MD-PSA-165029-NC-RFB / Single Stage - One Surveying Works in Balti and IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Canceled 2020-03-19 2020-03-23 2020-03-24 2020-05-10 2020-06-09 2020-07-14 2021-10-03 Envelope Soroca Rayon MD-PSA-165030-NC-RFB / Single Stage - One Surveying Works in Briceni IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Canceled 2020-03-19 2020-03-23 2020-03-24 2020-05-10 2020-06-09 2020-07-14 2021-10-03 Envelope rayon MD-PSA-189891-NC-RFB / Under Single Stage - One Surveying Works in Briceni IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2020-08-21 2020-09-08 2020-08-26 2020-10-07 2020-10-09 2020-11-06 2020-10-09 2020-12-11 2021-06-09 Envelope rayon on Page 1 MD-PSA-193676-NC-RFB / Under Single Stage - One Surveying Works in Soroca IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2020-09-14 2020-09-18 2020-09-19 2020-10-31 2020-10-23 2020-11-30 2020-12-02 2021-01-04 2021-07-03 Envelope Rayon and Balti Municipality on MD-PSA-204704-NC-RFB / Pending Single Stage - One Surveying Works in Drochia IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2020-11-18 2020-11-23 2021-01-04 2021-02-03 2021-03-10 2021-09-06 Envelope rayon on MD-PSA-207610-NC-RFB / Single Stage - One Surveying Works in Riscani IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Canceled 2020-12-07 2020-12-03 2020-12-12 2020-12-29 2021-01-23 2021-02-03 2021-02-22 2021-03-29 2021-09-25 Envelope rayon MD-PSA-210280-NC-RFB / Under Land Administration System Single Stage - One Completion of the Digital IDA / 63060 Post Request for Bids Open - National 0.00 Implementati 2020-12-23 2020-12-25 2020-12-28 2021-02-17 2021-02-17 2021-03-19 2021-03-18 2021-04-23 2021-10-20 Strengthening Envelope archive on MD-PSA-214547-NC-RFB / Under Single Stage - One Surveying Works in Falesti IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2021-01-18 2021-01-22 2021-01-23 2021-03-06 2021-04-05 2021-05-10 2021-11-06 Envelope rayon on MD-PSA-208040-NC-RFB / Single Stage - One Surveying Works in Nisporeni IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Canceled 2020-12-09 2021-03-29 2020-12-14 2021-02-03 2021-02-03 2021-03-05 2021-04-09 2021-10-06 Envelope rayon MD-PSA-218340-NC-RFB / Under Single Stage - One Surveying Works in Singerei IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2021-02-10 2021-02-12 2021-02-12 2021-03-17 2021-04-16 2021-05-21 2021-11-17 Envelope rayon on MD-PSA-177424-NC-RFB / Single Stage - One Surveying works, Floresti IDA / 63060 First Property Registration Post Request for Bids Open - National 731,637.62 Signed 2020-06-15 2020-09-25 2020-06-22 2020-08-08 2020-11-04 2020-09-07 2021-01-11 2021-02-26 2021-03-02 2022-05-18 Envelope rayon MD-PSA-177425-NC-RFB / Under Single Stage - One Surveying works, Donduseni IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2020-06-15 2020-10-06 2020-06-22 2020-08-08 2020-11-11 2020-09-07 2020-12-23 2021-02-26 2022-05-18 Envelope rayon on MD-PSA-224451-NC-DIR / Pending MoldPos Connection Services IDA / 63060 First Property Registration Post Direct Selection Direct 0.00 Implementati 2021-03-19 2021-03-24 2021-04-28 2023-12-31 for Surveying works, Ingeocad on direct contract. MD-PSA-226463-NC-RFB / Pending Single Stage - One Surveying works, Soldanesti IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2021-03-31 2021-04-05 2021-05-17 2021-06-16 2021-07-21 2022-01-17 Envelope rayon on MD-PSA-218341-NC-RFB / Pending Single Stage - One Surveying Works in Straseni IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2021-02-24 2021-03-05 2021-04-16 2021-05-16 2021-06-20 2021-12-17 Envelope rayon on MD-PSA-230424-NC-RFB / Pending Single Stage - One Surveying works, Glodeni IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2021-04-23 2021-04-28 2021-06-09 2021-07-09 2021-08-13 2022-02-09 Envelope rayon on MD-PSA-234157-NC-RFB / Pending Single Stage - One Surveying Works in Chisinau IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2021-05-14 2021-05-14 2021-06-25 2021-07-25 2021-08-29 2022-02-25 Envelope municipality on MD-PSA-236024-NC-RFB / Pending Single Stage - One Surveying Works in Calarasi IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2021-05-28 2021-06-02 2021-07-14 2021-08-13 2021-09-17 2022-03-16 Envelope rayon on MD-PSA-239012-NC-RFB / Pending Single Stage - One Surveying Works in Telenesti IDA / 63060 First Property Registration Post Request for Bids Open - National 0.00 Implementati 2021-06-14 2021-06-19 2021-07-31 2021-08-30 2021-10-04 2022-04-02 Envelope rayon on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Consultant MD-PSA-122740-CS-CQS / IDA / 63060 First Property Registration Post Qualification Open - National 0.00 Canceled 2019-12-02 2020-10-19 2019-12-23 2020-02-05 2020-03-06 2020-04-10 2021-04-05 Public Awareness Selection Consultant MD-PSA-122736-CS-LCS / Capacity Building and Project IDA / 63060 Post Qualification Open - National 36,643.00 Signed 2019-12-02 2020-10-19 2019-12-23 2020-02-05 2021-01-29 2020-03-06 2021-03-16 2020-04-10 2021-05-12 2020-10-07 Customer Satisfaction Survey Management Selection MD-PSA-168530-CS-CQS / International Consultant Consultant Land Administration System Under Company for developing of IDA / 63060 Post Qualification Open - International 0.00 2020-04-20 2020-10-27 2020-05-11 2020-06-24 2020-07-24 2020-08-28 2021-02-24 Strengthening Implementation standards for National Spatial Selection Data Infrastructure MD-PSA-210225-CS-LCS / Capacity Building and Project Least Cost Pending Project Audit Services for IDA / 63060 Post Open - National 0.00 2020-12-21 2020-12-21 2020-12-21 2021-01-18 2021-02-17 2021-03-24 2021-04-28 2021-10-25 Management Selection Implementation 2019 - 2020 Consultant MD-PSA-122759-CS-CQS / Capacity Building and Project Pending IDA / 63060 Post Qualification Open - National 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 Social Survey Management Implementation Selection MD-PSA-174745-NC-RFB / International Consultant Consultant Land Administration System Pending Company for developing of IDA / 63060 Post Qualification Open - International 0.00 2021-06-15 2021-07-06 2021-08-19 2021-09-18 2021-10-23 2022-04-21 Strengthening Implementation National Spatial Data Selection Infrastructure Geoportal INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 MD-PSA-98080-CS-INDV / Individual Project Implementation Unit Capacity Building and Project IDA / 63060 Post Consultant Open 30,712.32 Signed 2019-02-03 2019-01-31 2019-02-22 2019-03-25 2019-02-24 2019-12-03 2019-03-01 2019-05-28 2024-06-28 Financial Management Management Selection Specialist MD-PSA-98086-CS-INDV / Individual Capacity Building and Project Project Implementation Unit IDA / 63060 Post Consultant Open 28,796.93 Terminated 2019-02-03 2019-01-31 2019-02-22 2019-03-19 2019-02-24 2019-05-07 2019-03-01 2019-05-17 2023-12-29 Management Procurement Specialist Selection MD-PSA-120121-CS-CDS / Technical training course on Capacity Building and Project IDA / 63060 Post Direct Selection Direct 2,500.00 Completed 2019-06-27 2019-07-10 2019-07-07 2019-07-11 2019-08-01 2019-11-13 2019-08-31 2019-12-30 the general modules of the Management ArcGis Individual MD-PSA-120113-CS-INDV / IDA / 63060 First Property Registration Post Consultant Open 47,144.08 Signed 2019-07-02 2019-07-12 2019-08-18 2019-09-13 2019-09-08 2019-10-25 2019-10-13 2019-11-15 2023-12-31 Initial Data Collection Expert Selection Individual MD-PSA-122761-CS-INDV / Capacity Building and Project IDA / 63060 Post Consultant Open 0.00 Canceled 2019-10-15 2019-11-11 2019-12-03 2019-12-24 2020-01-28 2021-01-22 Social Development Specialist Management Selection Individual MD-PSA-124223-CS-INDV / Capacity Building and Project IDA / 63060 Post Consultant Open 0.00 Canceled 2019-10-15 2019-11-11 2019-12-03 2019-12-24 2020-01-28 2021-01-22 Environmental Specialist Management Selection MD-PSA-122757-CS-INDV / Individual Coordinator for Collection of IDA / 63060 Property Valuation Post Consultant Open 0.00 Canceled 2019-09-02 2019-10-21 2019-11-11 2019-12-16 2020-12-10 market data, Modeling & GIS Selection consultant (local) MD-PSA-122756-CS-INDV / Individual Coordinator for Collection of IDA / 63060 Property Valuation Post Consultant Open 0.00 Canceled 2019-09-02 2019-10-25 2019-10-21 2019-11-11 2019-12-16 2020-12-10 market data, Modeling Selection consultant (Local Consultant ) MD-PSA-122749-CS-INDV / Individual Land Administration System Quality Control digital archive IDA / 63060 Post Consultant Open 19,409.91 Signed 2019-12-02 2020-02-11 2020-01-20 2020-03-26 2020-02-10 2020-06-01 2020-03-16 2020-06-01 2021-03-11 Strengthening consultant (local, 12 persons) Selection MD-PSA-122754-CS-INDV / Individual Collection of market data IDA / 63060 Property Valuation Post Consultant Open 6,241.76 Signed 2019-12-02 2019-10-25 2020-01-20 2020-02-11 2020-02-10 2020-07-01 2020-03-16 2020-07-01 2021-03-11 Consultant (local, 45 persons) Selection MD-PSA-122760-CS-INDV / Individual Capacity Building and Project Monitoring&Evaluation IDA / 63060 Post Consultant Open 0.00 Canceled 2019-10-15 2019-11-01 2019-12-03 2019-12-24 2020-01-28 2021-01-22 Management Specialist Selection MD-PSA-122758-CS-INDV / Review of legislation, Individual exemptions, and IDA / 63060 Property Valuation Post Consultant Open 0.00 Canceled 2020-06-01 2020-07-20 2020-08-10 2020-09-14 2021-09-09 socioeconomic analysis, Selection (international consultant) MD-PSA-135921-CS-INDV / Individual Under International Individual IDA / 63060 Property Valuation Post Consultant Open 0.00 2019-10-31 2019-11-14 2019-12-19 2020-01-09 2020-02-13 2020-12-31 Implementation Valuation Consultant Selection MD-PSA-136123-CS-INDV / Individual QA - Ground Checks 5 IDA / 63060 First Property Registration Post Consultant Open 0.00 Canceled 2019-12-02 2019-11-28 2020-01-20 2020-02-10 2020-03-16 2020-09-12 Individual Consultants Selection MD-PSA-97718-CS-INDV / Individual Capacity Building and Project Project Implementation Unit IDA / 63060 Post Consultant Open 0.00 Canceled 2019-02-03 2019-02-22 2019-02-24 2019-03-01 2024-06-28 Management Director Selection MD-PSA-97718-CS-INDV-2 Individual Capacity Building and Project / Project Implementation Unit IDA / 63060 Post Consultant Open 0.00 Canceled 2019-10-30 2019-11-08 2019-11-18 2019-11-20 2019-11-25 2025-03-24 Management Director Selection MD-PSA-135917-CS-INDV / Individual Capacity Building and Project Trainer (Statistician), IDA / 63060 Post Consultant Open 1,115.27 Signed 2019-11-05 2019-11-12 2019-12-24 2020-03-19 2020-01-14 2020-03-19 2020-02-18 2020-05-15 2020-03-19 Management Individual Consultant Selection MD-PSA-142661-CS-INDV / Individual Initial Data Collection Expert IDA / 63060 First Property Registration Post Consultant Open 0.00 Canceled 2019-11-01 2019-11-11 2019-12-20 2020-01-10 2020-02-14 2021-02-08 (3 local Consultants) Selection MD-PSA-136123-CS-INDV-2 Individual / QA-Ground Check IDA / 63060 First Property Registration Post Consultant Open 0.00 Canceled 2020-02-03 2020-06-14 2020-03-13 2020-04-03 2020-05-08 2020-11-04 Consultants (5 Consultants) Selection MD-PSA-142661-CS-INDV-2 Individual / Initial Data Collection IDA / 63060 First Property Registration Post Consultant Open 12,318.04 Signed 2020-02-02 2020-02-06 2020-03-13 2020-03-26 2020-04-03 2020-07-01 2020-05-08 2020-07-01 2021-05-03 Consultants (5 Consultants) Selection Individual MD-PSA-124223-CS-INDV-2 Capacity Building and Project IDA / 63060 Post Consultant Open 0.00 Canceled 2020-02-27 2020-03-05 2020-04-10 2020-05-01 2020-06-05 2021-05-31 / Environmental Specialist Management Selection MD-PSA-122756-CS-INDV-2 Individual / Individual Consultant for the Under IDA / 63060 Property Valuation Post Consultant Open 0.00 2020-03-09 2020-03-13 2020-04-27 2020-05-18 2020-06-22 2021-06-17 Development of Valuation Implementation Selection Models MD-PSA-166617-CS-INDV / Individual Initial Data Collection IDA / 63060 First Property Registration Post Consultant Open 1,032.30 Signed 2020-03-30 2020-03-31 2020-05-09 2020-05-06 2020-05-30 2020-07-01 2020-07-04 2020-07-01 2021-06-29 Consultants (4 Consultants) Selection MD-PSA-168528-CS-INDV / International Individual Consultant for Implementation of the Individual Land Administration System Integrated Geospatial IDA / 63060 Post Consultant Open 0.00 Canceled 2020-04-15 2021-04-02 2020-06-03 2020-06-24 2020-07-29 2021-01-25 Strengthening Information Framework (IGIF) Selection Strategic Pathway 9, Communication and Engagement, in Moldova Page 3 MD-PSA-168548-CS-INDV / International Consultant for Individual Land Administration System Under developing Capacities Building IDA / 63060 Post Consultant Open 0.00 2020-04-19 2020-10-27 2020-06-07 2020-06-28 2020-08-02 2021-01-29 Strengthening Implementation in the Spatial Data Selection Infrastructure of Moldova MD-PSA-168549-CS-INDV / International Individual Individual Land Administration System Consultant for developing a IDA / 63060 Post Consultant Open 0.00 Canceled 2020-04-19 2020-11-03 2020-06-07 2020-06-28 2020-08-02 2020-12-30 Strengthening Business Model for the Spatial Selection Data Infrastructure in Moldova MD-PSA-189887-CS-INDV / Individual Land Administration System Quality Control digital archive IDA / 63060 Post Consultant Open 26,281.14 Signed 2020-08-21 2020-08-28 2020-10-09 2020-10-02 2020-10-30 2020-10-22 2020-12-04 2020-10-22 2021-11-29 Strengthening consultant (local, 6 persons) Selection MD-PSA-189890-CS-INDV / Individual Initial Data Collection and IDA / 63060 First Property Registration Post Consultant Open 28,919.76 Signed 2020-08-21 2020-08-28 2020-10-09 2020-10-01 2020-10-30 2020-10-20 2020-12-04 2020-10-20 2021-06-02 Quality Assurance Consultant Selection (local, 3 consultants) MD-PSA-197666-CS-INDV / Collection of market data and Individual real property evaluation IDA / 63060 Property Valuation Post Consultant Open 9,537.69 Signed 2020-10-05 2020-11-03 2020-11-23 2020-12-09 2020-12-14 2020-12-31 2021-01-18 2020-12-30 2021-07-17 Consultant (6 local Selection consultants) MD-PSA-202116-CS-INDV / Individual Land Administration System Quality Control digital archive IDA / 63060 Post Consultant Open 24,745.54 Signed 2020-11-02 2020-11-04 2020-12-21 2020-12-09 2021-01-11 2020-12-15 2021-02-15 2021-01-01 2021-08-14 Strengthening consultant (local, 4 persons) Selection MD-PSA-205277-CS-INDV / Individual Individual Consultant for the IDA / 63060 Property Valuation Post Consultant Open 0.00 Canceled 2020-11-18 2020-12-01 2021-01-08 2021-01-29 2021-03-05 2021-09-01 Development of Valuation Selection Models MD-PSA-210230-CS-INDV / Individual Land Administration System Quality Control digital archive IDA / 63060 Post Consultant Open 60,671.87 Signed 2020-12-25 2021-01-11 2021-02-19 2021-02-03 2021-03-12 2021-02-03 2021-04-16 2021-03-02 2021-10-13 Strengthening consultant (local, 5 persons) Selection MD-PSA-210232-CS-INDV / Individual Consultant for the Individual Development of Valuation IDA / 63060 Property Valuation Post Consultant Open 25,236.27 Signed 2020-12-25 2021-01-19 2021-02-23 2021-02-23 2021-03-16 2021-03-30 2021-04-20 2021-03-30 2021-10-17 Models (Commercial and Selection Industrial) MD-PSA-136124-CS-INDV / QA - Receiving Data @ Individual Pending Cadastru (Verification IDA / 63060 First Property Registration Post Consultant Open 0.00 2021-03-15 2021-05-03 2021-05-24 2021-06-28 2022-06-23 Implementation Acceptance) 7 Individual Selection Consultants MD-PSA-122735-CS-INDV / Preparation of the TOR for Individual development of module for Land Administration System Pending IDA / 63060 Post Consultant Open 0.00 2021-07-15 2021-09-02 2021-09-23 2021-10-28 2022-04-26 Systematic Registration, QA Strengthening Implementation Selection improvement and Valuation & MOLDLIS Modifications Individual MD-PSA-222257-CS-INDV / Capacity Building and Project Under IDA / 63060 Post Consultant Open 0.00 2021-03-09 2021-03-26 2021-04-27 2021-05-18 2021-06-22 2021-12-19 ICT Procurement Specialist Management Implementation Selection MD-PSA-213829-CS-INDV / Individual Pending Initial Data Collection IDA / 63060 First Property Registration Post Consultant Open 0.00 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2022-02-09 Implementation Consultants (2 Consultants) Selection MD-PSA-226575-CS-INDV / Individual Consultant for the Individual Under Development of the Real IDA / 63060 Property Valuation Post Consultant Open 0.00 2021-04-02 2021-03-31 2021-05-28 2021-06-18 2021-07-23 2022-01-19 Implementation Estate Evaluation Selection Methodological Framework MD-PSA-226665-CS-INDV / Individual Consultant to Individual Land Administration System Under Develop the Technical IDA / 63060 Post Consultant Open 0.00 2021-04-02 2021-03-31 2021-05-21 2021-06-11 2021-07-16 2022-01-12 Strengthening Implementation Specifications for the AIS Selection Public Utilities Register MD-PSA-228085-CS-INDV / Individual Individual Consultant for Pending IDA / 63060 First Property Registration Post Consultant Open 0.00 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2022-02-09 Initial Data Collection of State Implementation Selection Owned Real Estate MD-PSA-237390-CS-INDV / Individual International Individual Under IDA / 63060 Property Valuation Post Consultant Open 0.00 2021-06-04 2021-06-04 2021-07-23 2021-08-13 2021-09-17 2022-03-16 Consultant Real Property Implementation Selection Valuation MD-PSA-237377-CS-INDV / INDIVIDUAL CONSULTANT Individual Under FOR THE DEVELOPMENT OF IDA / 63060 Property Valuation Post Consultant Open 0.00 2021-06-04 2021-06-04 2021-07-30 2021-08-20 2021-09-24 2022-03-23 Implementation VALUATION MODELS (REAL Selection ESTATE) MD-PSA-239035-CS-INDV / Individual Quality Control digital archive Land Administration System Pending IDA / 63060 Post Consultant Open 0.00 2021-06-11 2021-08-06 2021-08-27 2021-10-01 2022-03-30 consultant (local, 6 persons Strengthening Implementation Selection for Digitization nr.2) Page 4 PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2019-04-11 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / 62120, IDA / 62150, IDA / 62140 C Executing Agency(ies): OORDINATING UNIT OF THE WACA PROJECT WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107603-CW- RFQ / Travaux de connexion Component 4: National Request for Single Stage - One 2019-06- internet sécurisée et IDA / 62120 Post Open - National 0.00 Canceled 2019-04-07 2019-05-06 Coordination Quotations Envelope 05 d'installation d'un système de visioconférence CI-WACA CI-107601-CW- RFQ / Travaux d'installation Component 2: Strengthening de câblage réseaux et Request for Single Stage - One 2020-05- 2020- IDA / 62120 the Policy and Institutional Post Open - National 59,612.34 Completed 2020-03-17 2020-04-03 2019-12-30 système de sécurité électrique Quotations Envelope 03 01-07 Framework des locaux du siège du projet WACA GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107607-GO-RFB / Acquisition de 02 Pick up Component 4: National Request for Single Stage - One double cabine de type 4X4 IDA / 62120 Post Open - National 102,901.32 Completed 2019-04-25 2019-05-25 2019-09-24 2019-07-24 2019-10-02 Coordination Quotations Envelope avec pare-buffles et covercross sur la part bailleur CI-WACA CI-107608-GO- RFQ / Acquisition de Component 4: National Request for Single Stage - One IDA / 62120 Post Open - National 17,326.60 Completed 2019-04-09 2019-05-09 2019-06-27 2019-05-30 2019-07-17 carburant pour les véhicules Coordination Quotations Envelope de l'UCP CI-WACA CI-107610-GO- Component 4: National Request for Single Stage - One RFQ / Acquisition de matériel IDA / 62120 Post Open - National 54,843.58 Completed 2019-03-30 2019-11-27 2019-04-29 2019-05-27 2019-05-29 2019-10-09 Coordination Quotations Envelope informatique CI-WACA CI-107612-GO- RFQ / Acquisition des Component 4: National Request for Single Stage - One IDA / 62120 Post Open - National 14,005.10 Completed 2019-04-29 2019-11-27 2019-05-29 2019-05-27 2019-06-13 2019-06-17 fournitures et consommables Coordination Quotations Envelope pour le matériel informatique CI-WACA CI-107614-GO- RFQ / Acquisition de petits Component 4: National Request for Single Stage - One IDA / 62120 Post Open - National 6,828.04 Completed 2019-04-14 2019-05-14 2019-04-29 2019-05-29 2019-05-17 matériels, fournitures de Coordination Quotations Envelope bureau et documentation CI-WACA CI-107752-GO- Component 4: National Request for Single Stage - One RFQ / Acquisition du matériel IDA / 62120 Post Open - National 8,842.66 Completed 2019-04-13 2019-05-13 2020-09-03 2019-05-28 2020-09-07 Coordination Quotations Envelope et outillage technique CI-WACA CI-107759-GO- Component 4: National Request for Single Stage - One RFQ / Acquisition de mobilier IDA / 62120 Post Open - National 71,551.00 Completed 2019-04-07 2019-05-07 2019-04-29 2019-06-06 2019-06-25 Coordination Quotations Envelope de bureau CI-WACA CI-107761-GO- Component 4: National Request for Single Stage - One RFQ / Acquisition de matériel IDA / 62120 Post Open - National 0.00 Canceled 2019-05-05 2019-06-04 2019-06-25 Coordination Quotations Envelope de bureau CI-WACA CI-110220-GO- RFQ / Acquisition et Component 4: National Request for Single Stage - One IDA / 62120 Post Open - National 0.00 Canceled 2019-05-15 2019-06-17 2019-08-16 installation d'un groupe Coordination Quotations Envelope électrogène CI-WACA CI-107604-GO-DIR / Acquisition des données Component 2: Strengthening Pending historiques des littoraux de IDA / 62120 the Policy and Institutional Post Direct Selection Direct 0.00 Implementati 2019-05-24 2019-05-29 2019-06-16 2019-07-16 l'Afrique de l'Ouest avec la Framework on société CEREMA CI-WACA CI-164263-NC-DIR / CONTRAT AVEC COMAFRIQUE TECHNOLOGIE POUR LA FOURNITURE DES Component 2: Strengthening LOGICIELS ARCGIS POUR LA IDA / 62120 the Policy and Institutional Post Direct Selection Direct 28,039.66 Completed 2020-03-16 2020-05-26 2020-03-21 2020-06-11 2020-04-05 2020-06-18 2020-06-04 2020-07-22 MISE EN PLACE DU Framework GÉOPORTAIL DE L’OBSERVATOIRE NATIONAL DU LITTORAL CI-WACA CI-164296-GO- Component 3: Strengthening Request for Single Stage - One RFQ / ACQUISITION FOURS IDA / 62120 National Physical and Social Post Open - National 0.00 Canceled 2020-06-14 2020-07-21 2020-09-19 Quotations Envelope AMELIORES Investments CI-WACA CI-164297-GO- RFQ / ACQUISITION DE Component 4: National Request for Single Stage - One IDA / 62120 Post Open - National 17,326.60 Completed 2020-03-31 2020-05-06 2019-06-27 2020-12-31 2019-08-14 CARBURANT POUR LES Coordination Quotations Envelope VÉHICULES DU PROJET CI-WACA CI-164300-GO- RFQ / ACQUISITION DE Component 4: National Request for Single Stage - One FOURNITURES ET IDA / 62120 Post Open - National 17,180.21 Signed 2020-04-06 2020-05-11 2019-10-22 2020-06-10 2020-06-10 Coordination Quotations Envelope CONSOMMABLES INFORMATIQUES Page 1 CI-WACA CI-164301-GO- RFQ / Acquisition de petits matériels, fournitures de Component 4: National Request for Single Stage - One IDA / 62120 Post Open - National 26,845.62 Completed 2020-03-30 2020-04-30 2020-05-26 2020-05-30 2020-05-26 bureau et documentation Coordination Quotations Envelope (papier, classeur) pour l'UCP et pour les kits des ateliers CI-WACA CI-164302-GO- RFQ / ACQUISITION DE MATERIEL ET OUTILLAGE TECHNIQUE Component 4: National Request for Single Stage - One IDA / 62120 Post Open - National 13,176.06 Completed 2020-04-28 2020-05-30 2019-10-31 2020-06-29 2019-10-31 (GPS,Gilets,Rallonges,Multipris Coordination Quotations Envelope es, Appareils photos,Chaussures de sécurités, Casques...) CI-WACA CI-164303-GO- RFQ / Acquisition de meubles de rangement, Bureaux, de Component 4: National Request for Single Stage - One chaises, chaises visiteurs, au IDA / 62120 Post Open - National 0.00 Canceled 2020-03-29 2020-04-30 2020-05-30 Coordination Quotations Envelope profit de l'équipe du projet, store, rideau, étiquettage des portes CI-WACA CI-164305-GO- Component 4: National Request for Single Stage - One RFQ / Fourniture et IDA / 62120 Post Open - National 2,590.53 Completed 2020-03-30 2020-05-05 2020-05-18 2020-06-04 2020-05-18 Coordination Quotations Envelope installation de trois (3) splits CI-WACA CI-164298-GO- RFQ / Acquisition de matériel Component 4: National Request for Single Stage - One informatique pour le IDA / 62120 Post Open - National 25,691.39 Completed 2020-06-08 2020-07-16 2020-06-30 2020-08-15 2020-07-07 Coordination Quotations Envelope personnel en complément de ceux acquis en 2019 CI-WACA CI-173392-GO- RFQ / Acquisition de kits Component 4: National Request for Single Stage - One sanitaires pour le personnel IDA / 62120 Post Open - National 1,843,472.18 Signed 2020-06-13 2020-07-28 2020-07-15 2020-08-27 Coordination Quotations Envelope de l'UCP dans le cadre de la prévention du COVID-19 CI-WACA CI-193336-GO-DIR / CONTRAT AVEC TOTAL CI POUR LA FOURNITURE DE Component 3: Strengthening CARBURANT POUR LES IDA / 62120 National Physical and Social Post Direct Selection Direct 35,772.20 Signed 2020-10-12 2020-10-01 2020-10-22 2020-09-28 2020-11-06 2020-11-09 2020-12-06 VEHICULES DE L'UCP ET DES Investments STRUCTURES PATENAIRES POUR L'EXECUTION DES ACTIVITES TECHNIQUES. CI-WACA CI-107606-GO- RFQ / Acquisition des fours Component 3: Strengthening Pending Request for Single Stage - One améliorés pour le fumage de IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2020-11-10 2020-11-29 2020-12-29 Quotations Envelope poisson à mettre à disposition Investments on des communautés CI-WACA CI-164294-GO-RFB / Fourniture en équipements et logiciels aux structures Component 2: Strengthening Pending nationales de collecte de Single Stage - One IDA / 62120 the Policy and Institutional Post Request for Bids Open - International 0.00 Implementati 2020-11-12 2020-11-17 2021-01-01 2021-01-16 2021-02-13 2021-05-14 données hydrométéo Envelope Framework on climatiques (SODEXAM, ONPC, plateforme nationale RRC, CRO, ANDE, CIAPOL) CI-WACA CI-221912-GO- RFQ-KK-21 / ACQUISITION D'EQUIPEMENT AU PROFIT DES POSTES DE COMMANDEMENT Component 3: Strengthening Pending Request for Single Stage - One ET DE CONTROLE D'ALERTE ( IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2021-09-26 2021-11-21 2022-05-20 Quotations Envelope FORMATION DES Investments on ADMINISTRATEURS A L'UTILISATION DES EQUIPEMENTS) CI-WACA CI-234851-GO- Under RFQ-KK-21 / FOURNITURE ET Component 4: National Request for Single Stage - One IDA / 62120 Post Limited 0.00 Implementati 2021-06-12 2021-06-04 2021-08-07 2022-02-03 CONSOMMABLE DE MATERIELS Coordination Quotations Envelope on INFORMATIQUES CI-WACA CI-234854-GO- RFQ-KK-21 / ACQUISITION DE Under Component 4: National Request for Single Stage - One PETITS MATERIELS, IDA / 62120 Post Limited 0.00 Implementati 2021-06-14 2021-08-09 2022-02-05 Coordination Quotations Envelope FOURNITURE DE BUREAU ET on DOCUMENTATION CI-WACA CI-234912-GO- RFQ KK-21 / Acquérir des kits Under Component 4: National Request for Single Stage - One sanitaires pour le personnel IDA / 62120 Post Limited 0.00 Implementati 2021-06-14 2021-06-02 2021-08-09 2022-02-05 Coordination Quotations Envelope de l'UCP dans le cadre de la on COVID-19 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107765-NC- Component 3: Strengthening Request for Single Stage - One RFQ / Production des outils IDA / 62120 National Physical and Social Post Open - National 0.00 Canceled 2019-07-16 2019-08-15 2019-09-05 Quotations Envelope d'appui au Dialogue social Investments CI-WACA CI-107791-NC- RFQ / Production des Component 3: Strengthening supports de communication et Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 15,784.70 Completed 2019-04-30 2019-05-30 2019-10-22 2019-06-29 2019-12-19 gadgets (Branting de Quotations Envelope Investments véhicules, flyers, kakemonos, banderoles, tee-shirt, etc.) CI-WACA CI-107803-NC- Component 3: Strengthening RFQ / Confection des Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 3,385.98 Completed 2019-04-28 2019-05-28 2019-10-22 2019-06-27 2020-03-16 panneaux directionnels et Quotations Envelope Investments d'enseigne du WACA Page 2 CI-WACA CI-107814-NC-DIR / Contrat avec AGOSOFT pour le paramétrage et l'assistance Component 4: National du logiciel de comptabilité IDA / 62120 Post Direct Selection Direct 45,087.46 Completed 2019-04-09 2019-07-03 2019-04-14 2019-08-23 2019-04-28 2019-08-05 2019-05-28 2019-09-02 Coordination TOMPRO et la livraison de TOMARCHE (y compris formation CI-WACA CI-107815-NC- Component 4: National Request for Single Stage - One RFQ / Assurance des IDA / 62120 Post Open - National 4,519.75 Completed 2019-05-12 2019-06-11 2020-05-14 2019-07-11 2020-06-08 Coordination Quotations Envelope véhicules CI-WACA CI-107816-NC-DIR / Contrat d'entretien et de Component 4: National IDA / 62120 Post Direct Selection Direct 0.00 Canceled 2019-05-02 2019-05-07 2019-05-22 2019-06-21 réparation des véhicules avec Coordination le concessionnaire CI-WACA CI-107817-NC-DIR / Contrat de bail pour la Component 4: National IDA / 62120 Post Direct Selection Direct 61,588.71 Completed 2019-04-01 2019-02-06 2019-04-06 2019-01-22 2019-04-18 2019-01-16 2020-04-12 2019-01-23 location du siège du projet Coordination avec M. FIANKAN CI-WACA CI-108336-NC- RFQ / Service d'entretien, de Component 4: National Request for Single Stage - One nettoyage, de livraison de IDA / 62120 Post Open - National 12,926.48 Completed 2019-05-01 2020-01-07 2019-05-24 2019-06-11 2020-05-18 2019-12-31 Coordination Quotations Envelope fournitures et produits d'entretien CI-WACA CI-108337-NC- Component 4: National Request for Single Stage - One RFQ / Couverture Assurance IDA / 62120 Post Open - National 5,671.87 Signed 2019-04-23 2019-05-27 2019-07-17 2020-05-21 Coordination Quotations Envelope santé du personnel CI-WACA CI-109988-NC-DIR / Convention avec l'OIPR pour les activités de restauration Component 4: National IDA / 62120 Post Direct Selection Direct 0.00 Canceled 2019-09-10 2019-09-11 2019-09-26 2020-09-25 du Parc National d'Azagny et Coordination le Parc National des Iles Ehotilés CI-WACA CI-110226-NC- Component 4: National Request for Single Stage - One IDA / 62120 Post Open - National 10,557.10 Completed 2019-04-21 2019-11-27 2019-06-16 2019-05-05 2020-06-15 2019-12-31 RFQ / Services de gardiennage Coordination Quotations Envelope CI-WACA CI-110211-NC- RFQ / Installation d'un Component 4: National Request for Single Stage - One système d'archivage IDA / 62120 Post Open - National 0.00 Canceled 2019-06-01 2019-06-30 2019-07-30 Coordination Quotations Envelope électronique des documents du projet CI-WACA CI-130047-NC- RFQ / Fourniture et Component 4: National Request for Single Stage - One installation d'un système de IDA / 62120 Post Open - National 228,186.03 Signed 2019-09-28 2019-11-23 2020-02-13 2019-12-23 2020-02-18 Coordination Quotations Envelope visioconférence pour projet WACA CI-WACA CI-164284-NC-DIR / Contrat avec ATLANTIQUE ASSURANCE POUR LA FOURNITURE DE SERVICE Component 4: National D’ASSURANCE MALADIE ET IDA / 62120 Post Direct Selection Direct 11,469.96 Completed 2020-03-17 2020-04-09 2020-03-22 2020-06-09 2020-04-17 2020-07-23 2020-10-14 2020-07-27 Coordination INDIVIDUELLE ACCIDENT POUR LE PERSONNEL DU PROJET WACA AU TITRE DE L’ANNEE 2020 CI-WACA CI-164307-NC- RFQ / Recrutement d'un prestataire pour produire les Component 3: Strengthening supports de sensibilisation Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 0.00 Canceled 2020-05-24 2020-07-08 2020-09-06 (spot audiovisuelle, des Quotations Envelope Investments contenus audio, PLV, boite à outils, etc.) et Edition des documents du MGP CI-WACA CI-130049-NC- RFQ / Services d'entretien des Component 4: National Request for Single Stage - One installations électriques du IDA / 62120 Post Open - National 7,133.58 Completed 2020-04-13 2020-06-08 2020-04-02 2020-12-31 2020-04-08 Coordination Quotations Envelope projet (Splits, sanitaire et plomberie) CI-WACA CI-164401-NC-DIR / Renouvellement du contrat Component 4: National de bail pour la location du IDA / 62120 Post Direct Selection Direct 49,270.97 Completed 2020-03-16 2019-01-15 2020-03-21 2020-02-03 2020-03-28 2020-02-12 2020-12-03 2020-03-24 Coordination siège du projet avec M. FIANKAN CI-WACA CI-164476-NC- RFQ / ENTRETIEN ET Component 4: National Request for Single Stage - One REPARATION DU MATERIEL IDA / 62120 Post Open - National 799.58 Completed 2020-05-12 2020-06-24 2020-07-20 2020-12-31 2020-07-20 Coordination Quotations Envelope INFORMATIQUE ET DU MOBILIER DE BUREAU CI-WACA CI-164480-NC-DIR / CONTRAT AVEC CFAO Pending Component 4: National MOTORS POUR L'ENTRETIEN IDA / 62120 Post Direct Selection Direct 0.00 Implementati 2020-04-29 2020-05-04 2020-05-28 2020-12-31 Coordination ET LA REPARATION DES on VEHICULES CI-WACA CI-164504-NC- Component 4: National Request for Single Stage - One RFQ / ASSURANCE DES IDA / 62120 Post Open - National 3,547.87 Signed 2020-03-19 2020-04-22 2020-05-14 2020-10-19 2020-05-14 Coordination Quotations Envelope VEHICULES CI-WACA CI-164498-NC-DIR / Convention avec l'OIPR pour Component 3: Strengthening les activités de restauration IDA / 62120 National Physical and Social Post Direct Selection Direct 358,910.00 Signed 2020-06-08 2020-09-17 2020-06-13 2020-09-04 2020-07-18 2020-10-14 2023-08-16 du Parc National d’Azagny et Investments le Parc National des Iles Ehotilés sur la durée du projet CI-WACA CI-164280-NC-DIR / CONTRAT AVEC EBEN COTE Component 4: National D'IVOIRE POUR L'ENTRETIEN IDA / 62120 Post Direct Selection Direct 22,517.48 Completed 2020-03-17 2019-11-13 2020-03-22 2019-12-05 2020-04-06 2020-03-26 2020-04-26 2020-03-26 Coordination DES LOCAUX DU PROJET WACA AU TITRE DE 2020 Page 3 CI-WACA CI-164278-NC-DIR / CONTRAT AVEC EZITO SECURITE POUR LE Component 4: National IDA / 62120 Post Direct Selection Direct 17,210.44 Completed 2020-06-04 2019-12-12 2020-06-09 2019-11-13 2020-06-24 2020-03-30 2021-03-21 2020-03-30 GARDIENNAGE DES LOCAUX Coordination DU PROJET WACA AU TITRE DE 2020 CI-WACA CI-193342-NC- RFQ / RECRUTEMENT D'UN PRESTATAIRE POUR L'EDITION Component 3: Strengthening DES DOCUMENTS DU MGP ( Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 27,135.50 Signed 2020-10-24 2020-11-19 2020-10-14 2020-12-29 MANUEL SIMPLIFIE, DEPLIANTS Quotations Envelope Investments DU MGP, SUPPORT DE FONCTIONNEMENT DES ORGANES DU MGP) CI-WACA CI-193345-NC- RFQ / RECRUTEMENT D'UN PRESTATAIRE POUR L'ORGANISATION D'UNE Component 3: Strengthening Pending Request for Single Stage - One CAMPAGNE DE IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2020-11-15 2021-01-10 2021-07-09 Quotations Envelope COMMUNICATION DIGITAL DE Investments on SENSIBILISATION SUR L'IMPORTANCE DE LA PRESERVATION DU LITTORAL. CI-WACA CI-198606-NC-DIR / Contrat avec la société AEG Component 3: Strengthening pour la connexion internet de IDA / 62120 National Physical and Social Post Direct Selection Direct 19,410.12 Signed 2020-10-22 2020-12-17 2020-10-27 2020-10-09 2020-12-01 2020-12-22 2021-05-30 la fibre optique du système de Investments visioconférence CI-WACA CI-218784-NC- RFQ-KK-21 / Recrutement d'un prestataire pour la confection de stand, kits, Component 2: Strengthening supports et gadget dans le Request for Single Stage - One IDA / 62120 the Policy and Institutional Post Open - National 0.00 Canceled 2021-04-20 2021-06-15 2021-12-12 cadre des activités de la Quotations Envelope Framework Quinzaine Nationale de l'Environnement et du Développement Durable (QNEDD) et du SARA. CI-WACA CI-218794-NC-DIR- KK-21 / Maintenance de la Component 3: Strengthening Pending plateforme numérique IDA / 62120 National Physical and Social Post Direct Selection Direct 0.00 Implementati 2021-05-03 2021-05-08 2021-06-12 2021-12-09 d'enregistrement et de suivi Investments on des plaintes CI-WACA CI-218795-NC- Component 3: Strengthening Under RFQ-KK-21 / Production de Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2021-06-14 2021-08-09 2022-02-05 supports de sensibilisation et Quotations Envelope Investments on de communication CI-WACA CI-218796-NC- RFQ-KK-21 / Recrutement d'un prestataire pour Component 3: Strengthening Pending l'organisation d'une campagne Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2021-03-28 2021-05-23 2021-11-19 de communication digitale de Quotations Envelope Investments on sensibilisation sur l'importance de la préservation du littoral CI-WACA CI-218797-NC- Component 3: Strengthening Pending RFQ-KK-21 / Conception et Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2021-03-28 2021-05-23 2021-11-19 production d'un bulletin Quotations Envelope Investments on d'information sur le WACA CI-WACA CI-221916-NC- Component 3: Strengthening Pending Request for Single Stage - One RFQ-KK-21 / NETTOYAGE DU IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2021-05-26 2021-07-21 2022-01-17 Quotations Envelope RESEAU PLUVIAL Investments on CI-WACA CI-221917-NC- Component 3: Strengthening Pending RFQ-KK-21 / IMPRESSION DES Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 GUIDES D'UTILISATION DES Quotations Envelope Investments on PESTICIDES CI-WACA CI-221919-NC- RFQ-KK-21 / CAMPAGNE DE Component 3: Strengthening Pending Request for Single Stage - One SENSIBILISATION AUX RISQUES IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 Quotations Envelope ET A LA GESTION DES Investments on DECHETS CI-WACA CI-221921-NC- RFQ-KK-21 / SURVEILLANCE Component 3: Strengthening Pending DU RESEAU PLUVIAL DE Request for Single Stage - One IDA / 62120 National Physical and Social Post Open - National 0.00 Implementati 2021-06-30 2021-08-25 2022-02-21 GRAND-LAHOU ( CONNEXION Quotations Envelope Investments on AU SYSTEME D'ALERTE ET AU SIG ) CI-WACA CI-218792-NC-DIR- KK-21 / Contrat avec Component 2: Strengthening Pending COMAFRIQUE TECHNOLOGIE IDA / 62120 the Policy and Institutional Post Direct Selection Direct 0.00 Implementati 2021-03-16 2021-03-21 2021-04-25 2021-10-22 pour l'acquisition de la licence Framework on ARCGIS CI-WACA CI-221922-NC-DIR- Pending KK-21 / MAINTENANCE DE Component 4: National IDA / 62120 Post Direct Selection 0.00 Implementati 2021-05-26 2021-05-31 2021-07-05 2022-01-01 L'APPLICATION DE SUIVI- Coordination on EVALUATION RUCHE CI-WACA CI-218805-CW-DIR- KK-21 / Contrat avec le Groupement R&D pour la Pending Component 4: National prise en charge des frais IDA / 62120 Post Direct Selection Direct 0.00 Implementati 2021-03-29 2021-04-03 2021-05-08 2021-11-04 Coordination additifs dus à l'incidence de la on Covid-19 sur l'étude quantitative des risques naturels. CI-WACA CI-218790-NC-DIR- KK-21 / Hébergement et Component 2: Strengthening Pending maintenance du site internet IDA / 62120 the Policy and Institutional Post Direct Selection Direct 0.00 Implementati 2021-03-16 2021-03-21 2021-04-25 2021-10-22 de SGIE par Entente Directe Framework on avec le consultant MAP Page 4 CI-WACA CI-218782-NC-DIR- KK-21 / CONVENTION AVEC Component 2: Strengthening Pending L'URPCI POUR LA DIFFUSION IDA / 62120 the Policy and Institutional Post Direct Selection Direct 0.00 Implementati 2021-04-15 2021-04-20 2021-05-25 2021-11-21 DES MESSAGES DE Framework on SENSIBILISATION A TRAVERS LES RADIOS DE PROXIMITE CI-WACA CI-234840-NC-DIR- KK-21 / ENTRETIEN ET MAINTENANCE DES LOGICIELS Pending Component 4: National DE COMPTABILITE TOM2PRO ; IDA / 62120 Post Direct Selection Direct 0.00 Implementati 2021-05-27 2021-06-01 2021-07-06 2022-01-02 Coordination TOM2PAIE ET DE PASSATION on DES MARCHES TOM2MARCHE AVEC LE CABINET AGOSOFT. CI-WACA CI-234861-NC-DIR- Pending KK-21 / RENOUVELLEMENT Component 4: National IDA / 62120 Post Direct Selection Direct 0.00 Implementati 2021-05-31 2021-06-05 2021-07-10 2022-01-06 DU CONTRAT DE BAIL AU Coordination on TITRE DE L'ANNEE 2021 CI-WACA CI-235346-NC- RFQ-KK-21 / Entretien et Pending maintenance des installations Component 4: National Request for Single Stage - One IDA / 62120 Post Limited 0.00 Implementati 2021-06-13 2021-08-08 2022-02-04 électriques (climatiseurs, Coordination Quotations Envelope on groupe électrogène, sanitaire et plomberie CI-WACA CI-234865-NC- RFQ-KK-21 / ENTRETIEN DES Pending Component 4: National Request for Single Stage - One LOCAUX Y COMPRIS LE IDA / 62120 Post Limited 0.00 Implementati 2021-06-13 2021-08-08 2022-02-04 Coordination Quotations Envelope MATERIEL ET FOURNITURE on D'ENTRETIEN CI-WACA CI-234848-NC- Pending RFQ-KK-21 / ASSURANCE DU Component 4: National Request for Single Stage - One IDA / 62120 Post Limited 0.00 Implementati 2021-06-14 2021-08-09 2022-02-05 MATERIEL ROULANT AU TITRE Coordination Quotations Envelope on DE L'ANNEE 2021 CI-WACA CI-234867-NC- Under RFQ-KK-21 / ENTRETIEN ET Component 4: National Request for Single Stage - One IDA / 62120 Post Limited 0.00 Implementati 2021-06-14 2021-08-09 2022-02-05 REPARATION DU MATERIEL Coordination Quotations Envelope on INFORMATIQUE CI-WACA CI-234837-NC- RFQ-KK-21 / CONTRAT AVEC Pending Component 4: National SAHAM POUR L'ASSURANCE IDA / 62120 Post Direct Selection Direct 0.00 Implementati 2021-06-03 2021-06-08 2021-07-13 2022-07-13 Coordination DU PERSONNEL AU TITRE DE on L'ANNEE 2021 CI-WACA CI-234869-NC- Pending RFQ KK 21 / ENTRETIEN ET Component 4: National Request for Single Stage - One IDA / 62120 Post Limited 0.00 Implementati 2021-06-15 2021-08-10 2022-02-06 REPARATION DU MATERIEL ET Coordination Quotations Envelope on MOBILER SAUF INFORMATIQUE CI-WACA CI-234874-NC- Pending Component 4: National Request for Single Stage - One RFQ KK-21 / FOURNITURE DE IDA / 62120 Post Limited 0.00 Implementati 2021-06-14 2021-08-09 2022-02-05 Coordination Quotations Envelope SERVICE DE GARDIENNAGE on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107811-CS-CQS / Recrutement d'un consultant Component 3: Strengthening Consultant Under pour la Conception et IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2019-06-18 2020-04-01 2019-07-03 2019-07-10 2019-07-15 2019-07-27 2019-08-26 Implementation Hébergement du site Investments Selection (maintenance) CI-WACA CI-110148-CS- QCBS / Recrutement d'un cabinet pour évaluer les Component 3: Strengthening Quality And Cost- risques pour la zone pilote IDA / 62150 National Physical and Social Post Open - International 0.00 Canceled 2019-04-12 2019-06-14 2019-04-27 2019-05-07 2019-05-12 2019-05-17 2019-05-23 2019-06-02 2020-06-01 Based Selection (inondation côtière, érosion, Investments système d'alerte précoce de Grand Lahou) CI-WACA CI-110152-CS-CQS / Recrutement d'un cabinet ou ONG pour la réhabilitation et Component 3: Strengthening Consultant la plantation de mangroves IDA / 62150 National Physical and Social Post Qualification Open - National 0.00 Canceled 2019-08-05 2019-08-26 2019-09-04 2019-09-14 2019-09-29 2019-11-28 (les zones concernées seront Investments Selection ciblées dans le complexe lagunaire de Grand-Lahou) CI-WACA CI-110158-CS- QCBS / Recrutement d'un Component 3: Strengthening cabinet pour la réalisation de Quality And Cost- Under IDA / 62120 National Physical and Social Post Open - International 564,305.59 2019-04-16 2019-06-13 2019-04-23 2020-03-02 2019-04-30 2019-09-28 2019-05-07 2019-01-31 2019-05-08 2019-05-08 2019-05-14 2019-05-08 2019-05-24 2019-11-08 2020-05-23 2020-05-13 l'étude de préfaisabilité de la Based Selection Implementation Investments protection du cordon sableux de Grand Lahou CI-WACA CI-110160-CS-CQS / Recrutement d'un cabinet pour réaliser l'étude d'impact Component 3: Strengthening Consultant Pending environnemental et social IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2019-05-08 2019-05-29 2019-06-12 2019-06-19 2019-07-13 2019-09-11 Implementation pour la réhabilitation et la Investments Selection restauration des mangroves dans la zone de Grand Lahou CI-WACA CI-110192-CS- QCBS / Recrutement d'un Component 2: Strengthening cabinet pour l'élaboration du Quality And Cost- IDA / 62120 the Policy and Institutional Post Open - National 556,146.55 Signed 2019-05-13 2020-03-02 2019-05-28 2020-04-02 2019-07-11 2020-06-30 2019-08-10 2020-09-02 2019-08-20 2020-09-23 2019-09-03 2020-10-15 2019-09-27 2020-12-10 2019-11-26 Plan d'Aménagement de Based Selection Framework Gestion du Littoral Ivoirien (PAGLI) (durée de 6 à 9 mois) Page 5 CI-WACA CI-110046-CS- QCBS / Recrutement d'un cabinet d'audit externe du PPA Component 4: National Quality And Cost- Under 2018 et pour l'exercice IDA / 62120 Post Open - National 14,114.03 2019-07-25 2019-09-23 2019-08-09 2019-11-26 2019-09-18 2020-03-17 2019-09-20 2020-04-03 2019-10-05 2020-04-03 2019-10-20 2020-04-22 2019-11-09 2020-06-18 2021-10-29 Coordination Based Selection Implementation septembre 2018 à décembre2018 et les exercices 2019 et 2020 CI-WACA CI-125661-CS- QCBS / Evaluer les risques Component 3: Strengthening pour la zone pilote Quality And Cost- IDA / 62120 National Physical and Social Post Open - International 316,378.47 Completed 2019-08-23 2018-02-28 2019-08-24 2020-03-17 2019-08-26 2019-11-05 2019-08-27 2019-02-14 2019-08-28 2019-02-13 2019-08-30 2019-03-29 2019-09-01 2019-08-26 2020-06-27 2020-08-31 (inondation côtière, érosion, Based Selection Investments systeme d'alerte precoce de Grand Lahou) CI-WACA CI-164416-CS- Component 2: Strengthening QCBS / Recrutement d'un Quality And Cost- Under IDA / 62120 the Policy and Institutional Post Open - National 0.00 2020-04-22 2020-06-29 2020-05-13 2020-10-02 2020-05-23 2020-12-18 2020-05-27 2021-03-29 2020-06-26 2021-04-16 2020-07-15 2020-08-08 2021-01-31 cabinet pour élaborer l'EESS Based Selection Implementation Framework du PAGLI CI-WACA CI-164497-CS-CQS / Recrutement d’une ONG pour la réhabilitation et le Component 3: Strengthening Consultant reboisement des champs de Pending IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2020-06-25 2020-07-16 2020-07-26 2020-07-31 2020-08-24 2020-11-22 mangroves (les zones Implementation Investments Selection concernées seront ciblées dans le complexe lagunaire de Grand-Lahou) CI-WACA CI-218803-CS-CQS- KK-21 / Recrutement d'un Component 2: Strengthening consultant pour la conception Quality And Cost- Pending IDA / 62120 the Policy and Institutional Post Open - International 0.00 2021-09-28 2021-10-19 2021-12-02 2021-12-30 2022-01-29 2022-03-05 2022-04-09 2023-04-09 et la mise en œuvre d'un Based Selection Implementation Framework système d'alerte précoce sur les risques côtiers. CI-WACA CI-218818-CS-CQS- Component 3: Strengthening Consultant KK-01 / Recrutement d'un Under IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2021-03-30 2021-03-19 2021-04-20 2021-04-28 2021-06-03 2021-07-03 2021-08-07 2022-02-03 cabinet pour la réalisation de Implementation Investments Selection l'EIES de l'option d'adaptation CI-WACA CI-218819-CS-CQS- KK-21 / Recrutement d'une ONG pour la réhabilitation, le Component 3: Strengthening Consultant reboisement des champs de Pending IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2021-08-18 2021-09-08 2021-10-22 2021-11-21 2021-12-26 2022-06-24 mangrove et la formation des Implementation Investments Selection communautés dans les zones ciblées du complexe lagunaire de Grand-Lahou CI-WACA CI-218827-CS-CQS- KK-21 / Recrutement d'un Component 3: Strengthening Consultant cabinet pour la réalisation de Pending IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2021-04-28 2021-05-19 2021-07-02 2021-08-01 2021-09-05 2022-03-04 l'EIES de la faisabilité de la Implementation Investments Selection stabilisation du littoral de Port- Bouët CI-WACA CI-218828-CS-CQS- KK-21 / Recrutement d'un Component 3: Strengthening Consultant cabinet pour la réalisation de Pending IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2021-06-03 2021-06-24 2021-08-07 2021-09-06 2021-10-11 2022-04-09 l'évaluation environnementale Implementation Investments Selection et sociale liée à la mise en œuvre des AGR CI-WACA CI-221926-CS- QCBS-KK-21 / MISE EN PLACE Component 2: Strengthening D'UN SYSTEME DE GESTION Quality And Cost- Pending IDA / 62120 the Policy and Institutional Post Open - National 0.00 2021-09-16 2021-10-07 2021-11-20 2021-12-18 2022-01-17 2022-02-21 2022-03-28 2023-03-28 DURABLE DES TERRITOIRES: Based Selection Implementation Framework AGENDA 21, GOUVERNANACE, SIG TERRITORIAL CI-WACA CI-221929-CS- QCBS-KK-21 / ETUDE DE FAISABILITE POUR ( DECOUCHAGE DU RESEAU PLUVIAL/ COMBLEMENT ET Component 3: Strengthening MESURE DE SECURITE/ Quality And Cost- Pending IDA / 62120 National Physical and Social Post Open - International 0.00 2021-05-26 2021-06-16 2021-07-30 2021-08-27 2021-09-26 2021-10-31 2021-12-05 2022-12-05 CREATION D'UN RESEAU Based Selection Implementation Investments PLUVIAL/ REHAUSSEMENT DU TERRITOIRE/ CREATION DE PUITS D'EAU POTABLE/ CREATION D'UN RESEAU D'ELECTRICITE ) CI-WACA CI-221936-CS-QBS- KK-21 / PLANTATION DE PARCS A BOIS, FORMATION A LA GESTION DURABLE DES Component 3: Strengthening Consultant RESSOURCES, IDENTIFICATION Pending IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2021-10-14 2021-11-04 2021-12-18 2022-01-17 2022-02-21 2022-08-20 ET SECURISATION DES SITES, Implementation Investments Selection ELABORATIONS DES TEXTES REGLMENETAIRES ET REBOISEMENTS DES SITES EN ESPECE SELECTIONNE CI-WACA CI-164496-CS- QCBS / Recrutement d'un consultant pour réaliser un (e) constat ou étude d’impact Component 3: Strengthening Quality And Cost- environnemental et social IDA / 62120 National Physical and Social Post Open - National 0.00 Canceled 2020-05-20 2021-03-01 2020-06-10 2020-07-01 2020-07-05 2020-07-15 2020-08-03 2020-08-27 2020-09-08 Based Selection pour la réhabilitation et la Investments plantation des mangroves dans la zone de Grand Lahou et à Assinie (îles éhotilés). Page 6 CI-WACA CI-223165-CS-CQS / RECRUTEMENT D’UN CONSULTANT POUR LA REALISATION D’UN CONSTAT D'IMPACT ENVIRONNEMENTAL Component 3: Strengthening Consultant Under ET SOCIAL (CIES) DU SOUS- IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2021-03-22 2021-03-22 2021-04-12 2021-04-02 2021-04-22 2021-04-29 2021-05-16 2021-06-20 Implementation PROJET DE REHABILITATION Investments Selection ET DE PLANTATION DE MANGROVE DU COMPLEXE LAGUNAIRE DE GRAND- LAHOU CI-WACA CI-218815-CS-CQS- KK-21 / REALISER L'EVALUATION ENVIRONNEMENTALE ET SOCIALE DES TRAVAUX DE Component 3: Strengthening Consultant DEBOUCHAGE ET ENTRETIEN Pending IDA / 62120 National Physical and Social Post Qualification Open - National 0.00 2021-07-29 2021-08-19 2021-10-02 2021-11-01 2021-12-06 2022-06-04 DU RESEAU PLUVIAL ET DES Implementation Investments Selection TRAVAUX DE CONSTRUCTION DE L'ENTENNE RELAI AU PROFIT DES COMMUNAUTES DE LA ZONE PILOTE DU PROJET WACA INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-110036-CS- Individual INDV / Recrutement d'un Component 4: National IDA / 62120 Post Consultant Open 31,208.40 Completed 2019-04-17 2019-06-05 2019-05-08 2019-07-17 2019-05-13 2019-07-23 2019-06-02 2019-08-19 2019-11-29 2019-08-19 Spécialiste en Développement Coordination Selection institutionnel CI-WACA CI-110037-CS- Individual INDV / Recrutement d'un Component 4: National IDA / 62120 Post Consultant Open 3,120,840.00 Signed 2019-04-22 2019-03-08 2019-05-18 2019-05-02 2019-05-25 2019-05-15 2019-06-09 2019-06-17 2019-12-06 Spécialiste en Gestion du Coordination Selection littoral CI-WACA CI-110040-CS- Individual INDV / Recrutement d'un Component 4: National IDA / 62120 Post Consultant Open 58,408.94 Signed 2019-04-23 2019-11-13 2019-05-22 2020-02-21 2019-06-01 2020-03-12 2019-06-16 2020-03-20 2019-12-13 2020-03-20 Spécialiste en sauvegarde Coordination Selection social CI-WACA CI-110042-CS- Individual Component 4: National INDV / Recrutement de deux IDA / 62120 Post Consultant Open 14,563.92 Signed 2019-04-16 2019-01-14 2019-04-25 2019-03-20 2019-04-30 2019-05-15 2019-05-07 2019-05-28 2019-11-03 2019-06-12 Coordination (02) chauffeurs Selection CI-WACA CI-110045-CS- Individual Component 4: National INDV / Recrutement d'une IDA / 62120 Post Consultant Open 19,752.32 Completed 2019-04-15 2019-01-18 2019-05-01 2019-02-26 2019-05-08 2019-04-06 2019-05-23 2019-05-14 2019-11-19 2019-06-05 Coordination assistante de direction Selection CI-WACA CI-110050-CS- INDV / Recrutement d'un Individual Component 4: National consultant individuel pour IDA / 62120 Post Consultant Open 56,877.74 Signed 2019-04-29 2020-10-05 2019-05-25 2020-10-27 2019-06-04 2020-12-17 2019-07-02 2021-01-27 2019-12-29 Coordination l'évaluation, la détermination Selection et le ciblage des AGR CI-WACA CI-110052-CS- INDV / Recrutement d'un Component 3: Strengthening Individual cabinet pour l'étude pour IDA / 62120 National Physical and Social Post Consultant Open 46,583.92 Completed 2019-04-16 2019-06-13 2019-05-01 2018-07-10 2019-05-02 2018-07-16 2019-05-10 2019-01-09 2019-11-06 2019-01-09 fournir les données socio- Investments Selection économiques de base de la zone pilote CI-WACA CI-110156-CS-CQS / Recrutement d'un consultant Component 3: Strengthening Individual individuel pour la réalisation IDA / 62120 National Physical and Social Post Consultant Open 30,131.71 Completed 2019-06-25 2019-09-02 2019-07-21 2019-12-05 2019-07-26 2019-11-25 2019-08-30 2020-02-04 2020-02-26 2020-02-05 de l'étude de faisabilité pour Investments Selection la réhabilitation et la plantation de mangroves CI-WACA CI-110172-CS-CDS / Contrat avec le consultant international Jean POMMIER Component 2: Strengthening pour le transfert de IDA / 62120 the Policy and Institutional Post Direct Selection Direct 6,297.12 Signed 2019-05-14 2020-02-13 2019-05-24 2020-04-06 2019-06-23 2020-04-23 2019-07-23 compétences pour la gestion Framework du géo portail du système de gestion de l'information environnementale (SGIE) CI-WACA CI-110178-CS- INDV / Recrutement d'un Component 2: Strengthening Individual consultant national pour IDA / 62120 the Policy and Institutional Post Consultant Open 0.00 Canceled 2019-05-14 2019-06-09 2019-06-19 2019-07-06 2019-08-05 l'intégration des données du Framework Selection SGIE CI-WACA CI-110179-CS- INDV / Recrutement d'un Component 2: Strengthening Individual consultant national pour la IDA / 62120 the Policy and Institutional Post Consultant Open 13,459.13 Signed 2019-05-24 2020-08-03 2019-06-22 2020-09-02 2019-07-02 2020-09-25 2019-07-22 2020-12-08 2019-08-21 collecte des données en vue Framework Selection de l'actualisation y compris la formation de l'administrateur CI-WACA CI-110184-CS- INDV / Recrutement d'un consultant individuel pour faire l'état des lieux des capacités des structures Component 2: Strengthening Individual nationales pouvant fournir IDA / 62120 the Policy and Institutional Post Consultant Open 17,514.30 Completed 2019-04-23 2019-09-02 2019-05-17 2019-12-17 2019-05-27 2020-01-16 2019-06-13 2020-02-11 2019-07-13 2020-06-15 des informations Framework Selection hydroclimatiques en vue du renforcement de leurs plateaux techniques (SODEXAM, ONPC, plateforme nationale RRC, CRO, Page 7 CI-WACA CI-110202-CS- INDV / Recrutement d'un consultant pour l'élaboration du projet de décret et du Component 2: Strengthening Individual costing portant création, IDA / 62120 the Policy and Institutional Post Consultant Open 16,949.14 Completed 2019-04-15 2019-06-13 2019-04-30 2018-12-10 2019-05-05 2018-11-29 2019-05-17 2019-01-15 2019-06-16 2019-01-15 attribution, organisation et Framework Selection fonctionnement de l'Agence Nationale de Gestion Intégrée du Littoral (ANGIL) CI-WACA CI-130034-CS- INDV / Recrutement d'un consultant individuel pour le Individual Component 4: National paramétrage et l'installation IDA / 62120 Post Consultant Open 26,064.27 Completed 2019-09-18 2019-09-24 2019-10-14 2019-12-04 2019-10-24 2019-12-10 2019-11-17 2020-01-17 2019-12-17 2020-02-02 Coordination d'un système d'archivage Selection électronique des documents du projet CI-WACA CI-110164-CS-CDS / Contrat avec GLOBAL DATA BASE pour la mise en place Component 2: Strengthening d’une plateforme de partage IDA / 62120 the Policy and Institutional Post Direct Selection Direct 57,938.20 Completed 2020-03-20 2020-03-26 2020-04-01 2020-04-03 2020-05-05 2020-06-20 2020-11-01 2020-08-19 des données de l’observatoire Framework nationale du littoral de Côte d’Ivoire dans le cadre du Projet WACA-ResIP CI-WACA CI-164287-CS-CDS / CONTRAT AVEC MADAME Madame KOFFI Adjoua Olga Component 4: National IDA / 62120 Post Direct Selection Direct 1,629.16 Signed 2020-03-16 2017-10-10 2020-03-26 2020-03-10 2020-04-15 2020-03-20 2020-12-31 2020-03-20 Epouse KOUAKOU en qualité Coordination d'Assistante en Passation des Marchés du projet WACA CI-WACA CI-164291-CS-CDS / CONTRAT AVEC MADEMOISELLE Djekankou Component 4: National IDA / 62120 Post Direct Selection Direct 1,402.89 Signed 2020-03-16 2018-08-02 2020-03-26 2020-03-10 2020-04-15 2020-03-20 2020-12-31 2020-03-20 DIOUBATE en qualité Coordination d'Assistante Comptable du projet WACA CI-WACA CI-164502-CS- INDV / Recrutement d'un consultant pour la mise en place du système (permettant aux organes d'enregistrer, de Component 3: Strengthening Individual communiquer les plaintes IDA / 62120 National Physical and Social Post Consultant Open 14,427.80 Signed 2020-05-28 2020-06-24 2020-06-23 2020-07-15 2020-06-28 2020-09-03 2020-07-13 2020-11-06 2020-08-12 automatiquement à l'UCP et Investments Selection d'avoir l'état de traitement de chaque plainte) et la fourniture des équipements associés (tablettes CI-WACA CI-164506-CS-CDS / Contrat avec le consultant Component 2: Strengthening MAP APPLICATION BUILDING IDA / 62120 the Policy and Institutional Post Direct Selection Direct 5,418.61 Completed 2020-03-23 2020-03-26 2020-04-02 2020-04-09 2020-04-24 2020-06-17 2021-04-24 2020-07-21 (MAB) pour l'hébergement de Framework relooking et la maintenance du site internet de SGIE CI-WACA CI-164515-CS-CDS / Renouvellement du contrat avec OUATTARA Hafsa en Component 1: Strengthening IDA / 62120 Post Direct Selection Direct 3,048.02 Completed 2020-09-22 2020-06-15 2020-10-02 2020-07-30 2020-12-06 2020-08-12 2021-09-30 2020-08-12 qualité de Spécialiste en Regional Integration développement institutionnel du projet WACA CI-WACA CI-164516-CS-CDS / Contrat avec BONI Aya Marie Component 4: National Under Epouse Mme EBROTTIE en IDA / 62120 Post Direct Selection Direct 0.00 2020-09-20 2019-11-04 2020-09-30 2020-12-04 2021-06-02 Coordination Implementation qualité de Spécialiste en communication CI-WACA CI-164518-CS-CDS / Renouvellement du contrat Component 4: National IDA / 62120 Post Direct Selection Direct 1,664.47 Completed 2020-04-23 2020-04-27 2020-05-03 2020-04-24 2020-06-17 2020-06-15 2020-07-13 2020-06-15 avec AMBEU Assi Anin Rachel Coordination Epouse OMOKPRA CI-WACA CI-164519-CS-CDS / Renouvellement des contrats avec OUATTARA Component 4: National IDA / 62120 Post Direct Selection Direct 634.92 Completed 2020-04-22 2020-06-06 2020-05-02 2020-06-15 2020-06-30 2020-06-15 2021-06-30 2020-06-15 Salifou et GBEGBE Michel en Coordination qualité de chauffeurs du projet WACA CI-WACA CI-164520-CS-CDS / Contrat avec KOFFI N'Gbin Component 4: National Under IDA / 62120 Post Direct Selection Direct 0.00 2020-03-16 2020-01-06 2020-03-18 2020-03-25 2021-03-25 Denis en qualité de Coordination Implementation Comptable CI-WACA CI-164523-CS-CDS / Contrat avec KOUAKOU Hemman Ulrich Thibault en Component 4: National Under IDA / 62120 Post Direct Selection Direct 0.00 2020-03-16 2019-10-01 2020-03-19 2019-09-23 2020-03-27 2021-03-27 qualité de Spécialiste Coordination Implementation Multimédia et Chargé de l'informatique CI-WACA CI-164530-CS-CDS / Contrat avec GONGBEÏ Component 4: National Under Gonsan Mathieu en qualité de IDA / 62120 Post Direct Selection Direct 0.00 2020-03-16 2020-11-02 2020-03-26 2020-05-30 2021-05-30 Coordination Implementation Spécialiste en Evaluation Environnementale CI-WACA CI-164494-CS- INDV / Recrutement d'un consultant national pour la Component 2: Strengthening Individual Under collecte des données en vue IDA / 62120 the Policy and Institutional Post Consultant Open 0.00 2020-06-08 2020-07-09 2020-07-12 2020-08-28 2020-08-01 2020-09-15 Implementation de l'actualisation et Framework Selection l’intégration des données dans le nouveau géoportail Page 8 CI-WACA CI-177341-CS-CDS / CONTRAT AVEC COSIT POUR Component 4: National L’EXTENSION ET LA MISE A IDA / 62120 Post Direct Selection Direct 11,659.95 Signed 2020-06-04 2020-06-29 2020-06-14 2020-07-01 2020-07-13 2020-07-23 2020-08-07 Coordination JOUR DE L'APPLICATION DE SUIVI-EVALUATION RUCHE CI-WACA CI-125428-CS- INDV / Recrutement d'un Component 3: Strengthening Individual consultant individuel pour la Under IDA / 62120 National Physical and Social Post Consultant Open 0.00 2020-10-22 2020-10-26 2020-11-25 2020-12-10 2021-01-08 2021-02-07 formation des membres des Implementation Investments Selection Comités de gestion des plaintes sur leurs rôles CI-WACA CI-213248-CS-CDS / ETUDE DE FAISABILITE DE Component 3: Strengthening L'OPTION D'ADAPTATION Under IDA / 62120 National Physical and Social Post Direct Selection Direct 0.00 2021-01-28 2021-02-16 2021-02-07 2021-03-29 2022-01-23 CHOISIE POUR LA STABILITE Implementation Investments DU CORDON SABLEUX FDE GRAND-LAHOU CI-WACA CI-218798-CS- INDV-KK-21 / Recrutement d'un consultant pour l'élaboration du projet de décret fixant les modalités de Component 2: Strengthening Individual Pending mise en œuvres des IDA / 62120 the Policy and Institutional Post Consultant Open 0.00 2021-07-16 2021-09-03 2021-09-24 2021-10-29 2022-04-27 Implementation instruments de protection du Framework Selection littoral (article 7) y compris le décret fixant la liste des espaces et milieux à préserver (article 46) CI-WACA CI-218809-CS- INDV-KK-21 / Recrutement d'un consultant pour l'étude Component 3: Strengthening Individual Pending de faisabilité pour la mise en IDA / 62120 National Physical and Social Post Consultant Open 0.00 2021-07-28 2021-09-15 2021-10-06 2021-11-10 2022-05-09 Implementation place d'une antenne relai Investments Selection téléphonique au profit de 04 villages CI-WACA CI-218823-CS-CQS- KK-21 / Recrutement d'un prestataire pour la Component 3: Strengthening Individual planification des parcs à bois Pending IDA / 62120 National Physical and Social Post Consultant Open 0.00 2021-04-12 2021-05-31 2021-06-21 2021-07-26 2022-01-22 et la formation des Implementation Investments Selection communautés à la gestion durable des ressources en bois dans les villages cotiers CI-WACA CI-222298-CS- INDV-KK-21 / REALISATION Component 3: Strengthening Individual DE L'EVALUATION Pending IDA / 62120 National Physical and Social Post Consultant Open 0.00 2021-07-07 2021-08-25 2021-09-15 2021-10-20 2022-04-18 ENVIRONNEMENTAL ET Implementation Investments Selection SOCIAL POUR LA CREATION DES PARCS A BOIS CI-WACA CI-218832-CS-CDS- KK-21 / Renouvellement du Component 4: National Pending contrat de la spécialiste en IDA / 62120 Post Direct Selection Direct 0.00 2021-03-10 2021-03-20 2021-05-24 2021-11-20 Coordination Implementation développement institutionnelle de l'UCP WACA CI-WACA CI-222306-CS- Individual Component 4: National Under INDV-KK-21 / BILAN A MI- IDA / 62120 Post Consultant Open 0.00 2021-05-17 2021-05-10 2021-07-05 2021-07-26 2021-08-30 2022-02-26 Coordination Implementation PARCOURS DU PROJET Selection CI-WACA CI-221931-CS-CDS- Component 3: Strengthening KK-21 / ASSISTANCE A Pending IDA / 62120 National Physical and Social Post Direct Selection Direct 0.00 2021-03-25 2021-04-04 2021-06-08 2021-12-05 MAITRISE D'OUVRAGE A LA Implementation Investments PLANTATION DES MANGROVE CI-WACA CI-222308-CS-CDS- KK-21 / CONVENTION AVEC L'UIAP POUR LA PRISE EN Component 4: National Pending CHARGE DU PERSONNEL ET DE IDA / 62120 Post Direct Selection Direct 0.00 2021-05-18 2021-05-28 2021-08-01 2022-01-28 Coordination Implementation CERTAINES ACTIVITES DE FONCTIONNEMENT DU PROJET WACA CI-WACA CI-234828-CS- INDV-KK-21 / Individual Component 4: National Pending Renouvellement du Chargé de IDA / 62120 Post Consultant Open 0.00 2021-05-27 2021-07-15 2021-08-05 2021-09-09 2022-03-08 Coordination Implementation Communication MultiMedia et Selection Responsable Informatique CI-WACA CI-234799-CS- INDV-KK-21 / RENOUVELLEMENT DU Component 4: National Pending IDA / 62120 Post Direct Selection Direct 0.00 2021-06-07 2021-06-17 2021-08-21 2022-02-17 CONTRAT DE L'ASSISTANCE Coordination Implementation DE DIRECTION DU PROJET WACA CI-WACA CI-234803-CS- INDV-KK-21 / RENOUVELLEMENT DU Component 4: National Pending IDA / 62120 Post Direct Selection Direct 0.00 2021-06-07 2021-06-17 2021-08-21 2022-02-17 CONTRAT DE L'ASSISTANTE Coordination Implementation SPECIALISTE EN PASSATION DES MARCHES CI-WACA CI-234805-CS- INDV-KK-21 / Component 4: National Pending RENOUVELLEMNT DU IDA / 62120 Post Direct Selection Direct 0.00 2021-06-04 2021-06-14 2021-08-18 2022-02-14 Coordination Implementation CONTRAT DE L'ASSISTANTE COMPTABLE CI-WACA CI-234820-CS- INDV-KK-21 / Component 4: National Pending IDA / 62120 Post Direct Selection Direct 0.00 2021-06-07 2021-06-17 2021-08-21 2022-02-17 RENOUVELLEMENT DU Coordination Implementation CONTRAT DES CHAUFFEURS CI-WACA CI-234832-CS-CDS- Component 4: National Pending KK-21 / CONTRAT AVEC IDA / 62120 Post Direct Selection Direct 0.00 2021-06-08 2021-06-18 2021-08-22 2022-02-18 Coordination Implementation M.KOUAKOU Kouassi Lanzaré Page 9 CI-WACA CI-234831-CS-CDS- KK-21 / CONTRAT AVEC Component 4: National Pending N'GBEKE AMON SOSTHENE IDA / 62120 Post Direct Selection Direct 0.00 2021-06-08 2021-06-18 2021-08-22 2022-02-18 Coordination Implementation FELIX, RESPONSABLE ADMINISTRATIF ET FINANCIER CI-WACA CI-234796-CS- INDV-KK-21 / RENOUVELLEMENT DU Component 4: National Pending IDA / 62140 Post Direct Selection Direct 0.00 2021-06-07 2021-06-17 2021-08-21 2022-02-17 CONTRAT DE LA SPECIALISTE Coordination Implementation EN DEVELOPPEMENT INSTITUTIONNEL CI-WACA CI-234826-CS-CDS- KK-21 / Contrat avec M. IRO Component 4: National Pending IDA / 62120 Post Direct Selection Direct 0.00 2021-06-04 2021-06-14 2021-08-18 2022-02-14 Koulai Marius Vidal, Coordination Implementation Spécialiste en Suivi Evaluation Page 10 18 MONTHS PROCUREMENT PLAN-SSRLP PROJECT Project information: Malawi Social Support for Resilient Livelihood Project - P169198 Project Implementation Agency: National Local Government Finance Committee, Malawi Date of the Procurement Plan: September 2019 Period covered by this Procurement Plan: June 2019 to January 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Disposal of Public Assets Act, 2017 of the Republic of Malawi, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right 1 to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the REDISSE II project): Thresholds*, Procurement Methods, and Prior Review for Substantial Risk Thresholds for Procurement Expenditure Procurement Contracts Subject to No Approaches and Category Method Prior Review / [eq. US$] Methods* [eq. USD] All contracts at or above Open Competition USD10,000,000 are subject to International Market international advertising and the C ≥ 7,000,000 Approach and Direct use of the Bank’s SPDs (or other Contracting documents agreed with the 1 Works Bank). Open Competition National Market 200,000 < C < 7,000,000 None Approach 2 Thresholds for Procurement Expenditure Procurement Contracts Subject to No Approaches and Category Method Prior Review / [eq. US$] Methods* [eq. USD] C ≤ 200,000 RfQ None All contracts at or above Open Competition USD2,000,000 are subject to International Market international advertising and the C ≥ 1,000,000 Approach and Direct use of the Bank’s SPDs (or other Goods, IT and Contracting documents agreed with the 2 non-consulting Bank). services Open Competition National Market 100,000 < C < 1,000,000 None Approach C ≤ 100,000 RfQ None All contracts at or above USD1,000,000 are subject to for international advertising and the C < 200,000 Consulting Services use of the Bank’s SPDs (or other National documents agreed with the shortlist for Bank). 3 selection of All contracts at or above consultant firms for USD1,000,000 are subject to Engineering and international advertising and the C ≤ 300,000 Construction use of the Bank’s SPDs (or other Supervision documents agreed with the Bank). Selection of All values ≥ 300,000 4 Individual All Approaches consultants Training, Based on approved Workshops, This line activity is not subject 5 All Values Annual Work Plan & Study Tours to procurement Review. Budgets (AWPB) by TTL *These thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Other Special Procurement Arrangements: When approaching the national market, as agreed in the Procurement Plan, the Open National Bidding procedure of Public Procurement and Asset Disposal Act 2017 and Regulations (Applicable Version) may be used. The specific Requirements for national open competitive procurement include the following: a.open advertising of the procurement opportunity at the national level; b.the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d.contracts with an appropriate allocation of responsibilities, risks, and liabilities; e.publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g.an effective complaints mechanism; and h.maintenance of records of the Procurement Process. 3 Other national procurement arrangements (other than national open competitive procurement), that may be applied (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply Prequalification. Not expected for the works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Applicable for activities under component 1 on Improving Social and Economic Inclusion, especially those for Enhanced Public Works and Livelihood Programs. Reference to (if any) Project Operational/Procurement Manual: The National Local Government Finance Committee team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/Plan with Procurement Arrangements and Time Schedule: as per the table below: b) PROCUREMENT PLAN Works 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procureme Prequ National Review Expected Expected Comme No. (Description) Cost nt Method/ alifica Prefere by bid Contract nts US$ Arrangeme tion nce Bank opening Signature million nt (yes/n (yes/no) (Prior / date Date o) Post) 1. Minor works for 350,000.0 Open, Post No Post Septembe October maintenance of 0 National, r 11, 2020 16, 2020 District RFB SCTP/EPWP offices 2. Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procureme Prequa Nation Review Expected Expected Com No. (Description) Cost nt Method/ lificatio al by bid Contract ment US$ million Arrangeme n Prefer Bank opening Signatur s nt (yes/no ence (Prior / date e Date ) (yes/n Post) o) IDA 1. Procurement of 1,800,009.0 Open, Post No Post September October 27 motor 0 Internation 11, 2020 16, 2020 vehicles al, RFB 4 2. Procurement of 248,000.00 Limited, Post No Post September October 31 motor cycles National, 11, 2020 16, 2020 RFQ 3. Procurement of 1,659,750.4 Open, Post No Post July 24, August IEC Materials 0 Internation 2020 14, 2020 al, RFB 4. Procurement of 696,145.00 Open, Post No Post August 07, August office furniture, National, 2020 31, 2020 ICT equipment RFB and system upgrades 5. Procurement of 1,388,889.0 Open, Post No Post September Septembe materials, inputs 0 Internation 9, 2020 r 20, 2020 and tools for al, RFB Expanded Public Works Programme (EPwP) 6. Procurement of 1,084,698.0 CDD Post No Post January 20, February Household 0 Details to 2021 15, 2021 Livelihood and be Cooperative elaborated Assets following in the PIM CDD Approach in accordanc e with Annex XII, paragraph 6.10 of the Procureme nt Regulation s 7. Procurement of 10,000.00 Limited, Post No Post September October interactive National 11, 2020 16, 2020 mobile tracking RFQ system GRiF Trust Fund 8. Procurement of 500,000.00 Open, Post No Post February March 30, ICT system National, 15, 2021 2021 adaptation RFB Modules for using MIS for scalable SCTP 9. Procurement of 2,200,000.0 Open, Prior No Prior October 15, November ICT system 0 Internation 2020 30, 2020 upgrades for UBR al, for scalable SCTP RFB 10. Procurement of 700,000.00 Open, Post No Post November December ICT Equipment National, 15, 2020 30, 2020 for UBR data RFB collection for scalable SCTP 11. Procurement of 1,000,000.0 Open, Post No Prior April 15, May 30, E-payment 0 2021 2021 5 Services Internation ((Financial al, inclusion drive RFB (bank accounts or mobile money registration)) for scalable SCTP 12. Procurement of 500,000.00 Open, Post No Post April 15, May 30, adaptable National, 2021 2021 citizens’ RFB engagement/GR M to capture information specific to the scalable SCTP 13. Parametric 10,000,000. Open, Prior No Prior Not part of insurance 00 Internation the 18 coverage against al, months drought RFB plan 14. Consultancy Services 1 2 3 4 5 6 7 8 Ref. No. Description of Assignment Estimate Selection Review Expected Expected Comme d Method/ by date of Contract nts Cost Arrangeme Bank proposal Signature US$ nt (Prior / submissio Date Post) n IDA 1. Consulting services to carry 146,667.0 Open, Post August 30, Sept 20, out annual external audits 0 National 2021 2021 LCBS 2. Consulting services to carry 320,000.0 Open, Post March 31, April 21, out Baseline, Mid-line and End- 0 National 2020 2020 line surveys. QCBS 3. Consulting services to carry out 40,000.00 Open, Post Not part of Project Mid-Term Review National, 18 Months INDV plan 4. Consulting services to develop 140,000.0 Limited, Post March April 2021 MNSSP Bill 0 National, 2021 INDV 5. Consulting services to carry out 89,400.00 Open, Post March 31, April 21, Evidence Generation Survey National, 2020 2020 CQS GRiF Trust Fund 6. Consulting services to support 300,000.0 Open, Post August 20, September scalable SCTP 0 National, 2020 25, 2020 CQS 6 7. Consulting services to provide 100,000.0 Open, Post August 20, September support in legal and regulatory 0 National, 2020 25, 2020 work in setting up the scalable CQS SCTP 8. Consulting services for Data 1,000,000 Open, Prior July 25, August 20, Collection to Support SCTP .00 Internation 2020 2020 al, QCBS 9. Consulting services for the 1,000,000 Open, Prior July 15, August 30, provision of Insurance .00 Internation 2021 2021 Brokerage services al, CQS Training and Workshop (Training & Workshop activities are subject to TTL clearance) Estimat Estimated Expected Comment Ref. Training, workshop and study s ed Cost Duration Training/work No. tours (US$) (Days) shop Date 1. Evidence Building for Social 2 weeks September Planned for protection plus 30,000.0 2020 6 0 participant s 2. Learning visit on E-payment 1 week July 2020 Planned for 20,000.0 6 0 participant s 3. Procurement and Contract 2 weeks July 2020 Planned for Management 30,000.0 4 0 participant s 4. Environmental and Social 2 weeks November 2020 Planned for safeguards Management 26,000.0 3 0 participant s 5. Financial management for donor- 2 weeks August 2020 Planned for funded projects 18,000.0 2 0 participant s 6. Data analysis for Social Registry or 2 weeks March 2020 Planned for Unified Beneficiary Registry (UBR) 50,000.0 8 and Scalable Safety nets 0 participant s 7. Computerized accounting system 2 weeks April 2021 Planned for (Tompro 2) 20,000.0 2 0 participant s 8. Core course on Social protection or 2 weeks October 2020 Planned for safety nets 42,000.0 5 0 participant s 9. Learning visit on Economic 1 week December 2020 Planned for inclusion 25,000.0 6 0 participant s 10. Shock sensitive social protection 1week August 2020 Planned for trainings and workshops 55,000.0 30 0 7 participant s 11. IFMIS and MIS trainings and 2 weeks February 2021 Planned for workshops 60,000.0 20 0 participant s GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) the salaries of locally contracted support staff of the Project entities and units involved in Project implementation (excluding civil servants) and state contributions thereon; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance and insurance; (iv) communication technology (including, without limitation, internet and telephone) and maintenance of equipment; (v) rental expenses and utilities; (vi) building security and maintenance; (vii) translations services, photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 8 We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 9 c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 10 PROCUREMENT Malawi : Social Support for Resilient Livelihoods Project PLAN General Information Country: Malawi Bank’s Approval Date of the Original Procurement Plan: 2020-07-13 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169198 GPN Date: 2021-01-12 Project Name: Social Support for Resilient Livelihoods Project Loan / Credit No: IDA / D5300 N Executing Agency(ies): ational Local Government Finance Committee WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-201773-GO-RFB Under Improving Social and Single Stage - One / Procurement of 12No. Motor IDA / D5300 Post Request for Bids Open - National 770,000.00 973,475.11 Implementati 2020-12-15 2021-02-15 2020-12-20 2021-03-17 2021-01-31 2021-04-09 2021-03-02 2021-05-21 2021-04-06 2021-05-18 Economic Inclusion Envelope Vehicles on MW-NLGFC-183305-GO-RFQ / Procurement of office Improving Social and Request for Single Stage - One IDA / D5300 Post Limited 4,300.00 6,790.46 Completed 2020-12-20 2021-01-22 2021-01-10 2021-05-10 2021-01-24 2021-05-25 furniture for Livelihoods Economic Inclusion Quotations Envelope Support MW-NLGFC-183310-GO-RFQ / Procurement of office Improving Social and Request for Single Stage - One IDA / D5300 Post Limited 42,000.00 47,189.31 Signed 2021-01-04 2021-01-27 2021-03-01 2021-05-10 2021-08-28 equipment for Livelihoods Economic Inclusion Quotations Envelope Support MW-NLGFC-209692-GO-RFB Under Improving Social and Single Stage - One / Procurement of 31No Motor IDA / D5300 Post Request for Bids Open - National 240,000.00 0.00 Implementati 2021-04-06 2021-04-06 2021-04-10 2021-05-10 2021-05-03 2021-05-17 2021-05-25 2021-06-06 2021-07-18 Economic Inclusion Envelope Cycles for Livelihood Support on MW-NLGFC-201743-GO- RFQ. / Procurement of a Improving Social and Request for Single Stage - One Procurement of 2021 IDA / D5300 Post Limited 35,000.00 23,592.19 Signed 2020-12-06 2021-01-14 2021-01-31 2021-03-15 2021-07-30 Economic Inclusion Quotations Envelope Calendars, Diaries and Notebooks MW-NLGFC-201743-GO-RFQ / Procurement of 2021 Improving Social and Request for Single Stage - One IDA / D5300 Post Limited 35,000.00 0.00 Canceled 2020-12-19 2021-01-14 2021-02-19 2021-03-05 Calendars, diaries and Economic Inclusion Quotations Envelope notebooks MW-NLGFC-240248-GO-RFQ Capacity Building and Pending / 1No heavy duty Request for Single Stage - One IDA / D5300 Institutional Strengthening Post Limited 20,000.00 0.00 Implementati 2021-06-30 2021-07-15 2021-08-05 printer/photocopier for the Quotations Envelope Support on UBR NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-237562-NC-RFB / Provision of Electronic Under Payment Services for Social Improving Social and Single Stage - One IDA / D5300 Post Request for Bids Open - National 200,000.00 0.00 Implementati 2021-06-14 2021-06-14 2021-06-19 2021-07-19 2021-08-18 2021-09-22 2023-09-22 Cash Transfer Programme Economic Inclusion Envelope on (SCTP) in Blantyre, Nkhotakota and Karonga Districts CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-NLGFC-207101-CS-CQS Consultant Improving Social and Under / Baseline survey for IDA / D5300 Post Qualification 30,000.00 0.00 2020-12-16 2020-12-14 2020-12-30 2021-05-28 2021-01-29 2021-02-19 2021-04-20 Economic Inclusion Implementation Livelihoods support Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-LDF-TST-255157-CS- Capacity Building and Individual INDV. / Procurement of a IDA / D5300 Institutional Strengthening Prior Consultant Open 42,000.00 0.00 Under Review 2021-03-21 2021-03-17 2021-05-09 2021-05-28 2021-05-30 2021-07-04 2021-12-31 Procurement Consultant Support Selection Page 1 Programme des Marchés du Projet d’Appui au Secteur de L’Electricité (PASE) Relatif au Financement Initial & Additionnel Banque Mondiale - BEI - UE - 2017 PPM PASE 1 & 2 - 2017 I. Remarques Générales 1. FINANCEMENT CREDIT : IDA 2. ACCORD DE FINANCEMENT : N°A 5145 SN 3. PROJET : N° 125565 4. Unité d’Exécution du Projet : UEP PASE SENELEC 5. Montant du Crédit Initial PASE 1 : 85 000 000 USD / 42 500 000 000 F CFA (1 USD = 500 F CFA) 6. Montant du Crédit Additionnel BM - PASE 2 : 70 000 000 USD / 41 144 256 300 F CFA (1 USD = 587,7509 F CFA) 7. Montant du Prêt/Subvention Additionnel BEI - PASE 2 : 75 000 000 Euros / 49 196 775 000 F CFA (1 Euro = 655,957 F CFA) 8. Montant du Don Additionnel UE - PASE 2 : 15 000 000 Euros / 9 839 355 000 F CFA (1 Euro = 655,957 F CFA) 9. Pays : SENEGAL 10. Programme de Marchés de Janvier à Décembre 2017. 11. Dates de l’Approbation par l’IDA • Première Version PPM PASE 1 & 2 – 2017, approuvée, le 14 Février 2017. • Seconde Version PPM PASE 1 & 2 – 2017, mis à jour par le PASE et transmise à la BM le……………….. 2017. • Approbation Seconde Version PPM PASE 1 & 2 – 2017, par la BM reçue, le ……………….. 2017. 12. Date de l’Approbation par la DCMP • Approbation Seconde Version PPM SENELEC 2017, par la DCMP reçue, le 30 janvier 2017 1 • Première Version PPM PASE 1 & 2 - 2017, approuvée, le 03 mars 2017. 13. Date de Publication de l’Avis Général de Passation des Marchés (AGPM) PASE : • Sur United Nations Development Business (UNDB) One Line - DB Référence Nº WB1452-03/13 du 19 Mars 2013. 14. Date de Publication Nationale de l’Avis Général de Passation des Marchés (AGPM) du PASE 1 & 2 – 2017: • Dans le Journal National «Le Soleil» du 05 janvier 2017. II. Marchés Publics de Fournitures, Travaux et Services Autres que Consultants 2.1. Marché Soumis à Examen Préalable ou Post conformément aux Seuils de l’IDA de 2013 revus en 2016 en Vigueur au Sénégal NATURE DES METHODE DE PASSATION DE MARCHES VALEUR SEUIL CONTRATS SOUMIS A EXAMEN DEPENSES DU MARCHE $ EU PREALABLE DE L’IDA 1. Travaux AOI & AOIR ≥ 10 000 000 Tous les Contrats de Plus $10 000 000 USD et plus AON < 10 000 000 Tous les Contrats de $10 000 000 USD et plus Demande de Cotation - Au moins 03 offres < 200 000 Aucun Entente Directe Pas de Seuil Tous les Contrats de $100 000 USD et plus 2. Fournitures et AOI ≥ 1 000 000 Tous les Contrats de Plus $2 000 Services Autres que 000 USD et plus Consultant AON < 1 000 000 Tous les Contrats de Plus $10 000 000 USD et plus Consultation de Fournisseurs à l’Echelle < 100 000 Aucun Nationale - Au moins 03 offres Consultation de Fournisseurs à l’Echelle < 500 000 Aucun Nationale - Au moins 03 offres pour les Véhicules et le Carburant Entente Directe Pas de Seuil Tous les Contrats de $100 000 USD et Plus 2  AOI : Appel d’Offres International  AON : Appel d’Offres National  CF : Consultation de Fournisseurs A. Liste des Marchés de TRAVAUX & FOURNITURES Financés par la BM - BE I- UE, y- compris la Méthode de Passation de Marché : Associée et Principales Etape. 1 2 3 4 5 6 7 10 Exame Méthode n de Préféren Date Réf Coût Pré- Préala Contrat Passatio ce d’Ouverture . Estimé Qualificati ble BM (Description) n du National des Offres N° ($.US) on (O/N) (Ex Marché e (O/N) Prévue Ante/E x Post) P1A- Ligne et Poste HTA N Revue A 1 (WB/EIB): Marché à 03 Lots 18 300 N 25/08/2017 Priori Indépendants - BEI & BM 000 AOI 3 Lot 1: J.1. Extension et Densification de Réseau – BEI 8 000 1.1 95% : 7 600 000 & BM 5% : 000 400 000 Lot 2 : B. Passage 6.6 à 30 kV des 1.2 2 Feeders restants à Bel Air 5 000 (Arsenal et Port Sud) – EIB 95% : 4 000 750 000 & BM 5% : 250 000 Lot 3 : L.5 – Lot 1 – Dakar : Création de Postes et de Secteurs, 5 300 00 Extension et Renforcement de 0 1.3 Réseaux BT à Dakar et dans les Régions – 100% BM 2 3 4 5 6 7 10 1 Exame Méthode n de Préféren Date Réf Coût Pré- Préala Contrat Passatio ce d’Ouverture . Estimé Qualificati ble BM (Description) n du National des Offres N° ($.US) on (O/N) (Ex Marché e (O/N) Prévue Ante/E x Post) P1B- Ligne et Poste HTA & Poste HTB & Câble Fluvial 18 338 Revue A 2 N N 04/08/2017 (Protection, Télécom et 330 AOI Priori Téléconduite) : Marché à 04 Lots Indépendants – BM 4 Lot 1 : Sécurisation, Alimentation Electrique de KARMEL et 5 681 2.1 Amélioration de la Qualité de 000 Service des Feeders T32 ; T31 ; Rufisque Nord et Km 22 Lot 2 : Développement des Ventes et Amélioration de la Qualité de 2 556 2.2 Service à Mbour, Joal, Kayar, 000 Bayakh Lot 3 : L.16 - Kédougou - Raccordement au Réseau 8 400 2. 3 Interconnecte de SARAYA, BANDA 000 FASSI, SALEMATA ET FONGONLEMBI – KEDOUGOU – BM Lot 4 : Remplacement Câble 1 701 2.4 Fluvial de Sédhiou - 100% BM 330 1 2 3 4 5 6 7 10 Exame Méthode n de Préféren Date Réf Coût Pré- Préala Contrat Passatio ce d’Ouverture . Estimé Qualificati ble BM (Description) n du National des Offres N° ($.US) on (O/N) (Ex Marché e (O/N) Prévue Ante/E x Post) 5 P2A- Ligne et Poste HTA 7 504 3 (WB/EIB): Marché à 03 Lots 000 Indépendants - BEI – BM Lot 1: H.1. Extension et 2 643 Densification Réseaux Dabo 000 (750 000) + H.2. Extension et 3.1 Densification Réseaux Vélingara (1 893 000) = 2 643 000 – EIB 95% & BM 5% Lot 2 : I.2. Raccordement Diaobé- 2 721 Revue A N N 15/09/2017 Kounkané-Pakour (1 315 000) + 000 AOI Priori I.5. Raccordement Médina 3.2 Gounass à partir de Bokonto sur 47 km (1 406 000) = 2 721 000 – EIB 95% & BM 5% Lot 3: I.1. Raccordement 2 140 Marsasoum à partir de Tangori sur 000 23 km (734 000) + I.3. Raccordement Sindian à partir de 3.3 Baila sur 47 km (1 406 000) = 2 140 000 – EIB 95% & BM 5% 1 2 3 4 5 6 7 10 6 Exame Méthode n de Préféren Date Réf Coût Pré- Préala Contrat Passatio ce d’Ouverture . Estimé Qualificati ble BM (Description) n du National des Offres N° ($.US) on (O/N) (Ex Marché e (O/N) Prévue Ante/E x Post) P2B- Ligne et Poste HTA : 13 725 Programme UE - Composante 1 000 4 Marché à 02 Lots Indépendants Lot 1: Programme UE - Composante 1 - Dorsales PNUER- 6 Kolda - Médina Yoro Foulah (1 028 000 233 000) + Dorsales PNUER- 4.1 Medina Yoro Foulah – Pata (847 000) + Dorsales PNUER- Pata – Ndorma (770 000) + Composante Revue A N N 15/09/2017 2 - Electrification rurale BT AOI Priori (3 178 000) Lot 2 : I Programme UE - Composante 1 - Dorsales PNUER- 7 697 Djéné-Sakar-Diana Malari - Kolda 000 (1 900 000) + Dorsales PNUER- 4.2 Vélingara – Nétéboulou (1 926 000) + Dorsales PNUER- Djérédji – Bémet Bidjini (693 000) + Composante 2 - Electrification rurale BT (3 178 000) P3 – Poste HTB Ligne et Poste 31 229 HTA: Protection, Télécom et 000 Revue A 5 Téléconduite : – EIB 95 & BM N N 15/10/2017 AOI Priori 5% - Marché à 02 Lots Indépendants 7 Lot 1 : K. Création du Poste 28 000 Injecteur de Guédiawaye (Poste 000 5.1 HTB 90/30 kV) – EIB 95% (26 600 000) & BM 5% (1 400 000) Lot 2: Sécurisation de l’Alimentation Electrique des Clients des Postes Aéroport et 3 229 5.2 Université en Procédant au 000 Renouvellement des Cellules 30kV Non Fiables 1 2 3 4 5 6 7 10 Exame Méthode n de Préféren Date Réf Coût Pré- Préala Contrat Passatio ce d’Ouverture . Estimé Qualificati ble BM (Description) n du National des Offres N° ($.US) on (O/N) (Ex Marché e (O/N) Prévue Ante/E x Post) P4 - Poste HTB/ Protection, 5 000 Télécom et Téléconduite : 000 6 Marchés à 02 Lots Indépendants – BM & BEI Lot 1 : L.4 Automatisation de la Distribution avec la 2 000 AOI Revue A 25/08/2017 6.1 N N Télécommande des Appareils de 000 Priori Coupures -100% BM Lot 2 : J.2. Renforcement 3 000 Téléconduite Réseaux HTA de 000 6.2 Dakar et Environs– EIB 95% (2 850 000) & BM 5% (150 000) P5 - Fourniture Compteur: Fourniture 260 000 Compteurs 8 333 Revue A 7 AOI N N 15/05/2017 Modulaires à Paiement 000 Priori Préalable 8 P5 - Fourniture Compteur: Fourniture 300 000 Compteurs 11 Revue A 8 Modulaires à Paiement 250 000 AOI N N 15/07/2017 Priori Préalable – BEI 95% : 10 688 000 & BM 5% : 563 000 P6A - Fourniture Matériel pour Installation Compteurs et 8 901 0 9 Autres : Marché à 03 Lots - BM 00 100% Lot 1 – D-2 : Acquisition de Matériel 9.1 pour la Pose de 40 000 Compteurs 6 dans les Marches 667 000 Revue A Lot 2 - D-3 : Acquisition de Matériel N N 25/06/2017 AOI Priori pour la Reprise de Réseau de 20 234 000 9.2 Marchés Lot 3 – D-4 : Acquisition pour Installation Intérieure d'Environ 12 9.3 500 Clients à Faible Revenus 2 000 00 0 1 2 3 4 5 6 7 10 Exame Méthod n e de Préféren Date Réf Coût Pré- Préala Contrat Passati ce d’Ouverture . Estimé Qualificatio ble BM (Description) on du National des Offres N° ($.US) n (O/N) (Ex Marché e (O/N) Prévue Ante/E x Post) D-5 & C: Installation Intérieure 10 Clients à Faible Revenus 5 Revue A 250 000 AON N N Posterio 25/06/2017 Lot 1 – D-5 : Installation Intérieure 10. ri d'Environ 12 500 Clients à Faible 250 000 1 Revenus – BM 100% 9 Lot 2 - C- Installation Intérieure 10. 5 d'environ 25 000 Clients à Faible 2 000 000 Revenus - EIB 95% & BM 5% D-6 : Recrutement d'une Agence Revue A Conseil en Communication pour la 1 11 AON N N Posterio 25/06/2017 Campagne Marketing du WOYOFAL 300 000 ri - BM Revue A Acquisition de Matériel 12 CF N N Postério 10/04/2017 Informatique UEP et Personnel 100 000 ri Complémentaire Revue A 13 Frais Fonctionnement UEP (A la 60 000 CF N N Postério 10/04/2017 Demande) ri Campagne de Communication des CF Revue A Compteurs Intelligents: Forums 15 N N Posterio 10/05/2017 avec clients Grands Comptes) 20 000 ri Acquisition d'un Logiciel de Revue A Gestions Financière - Passation des 30 000 16 CF N N Posterio 10/04/2017 Marchés et Suivi - Evaluation ri (Acquisition & Installation) III. Marchés Publics de Services de Consultants 3.1. Marché Soumis à Examen Préalable ou Post conformément aux Seuils de l’IDA de 2013 revus en 2016 en Vigueur au Sénégal Les contrats qui seront soumis à l'Examen Préalable de la Banque Mondiale conformément aux dispositions de l'Annexe 1 des Directives de Sélection et Emploi de Consultants de janvier 2011 : 10 NATURE DE METHODE DE PASSATION VALEUR SEUIL CONTRATS SOUMIS A EXAMEN DEPENSES DE MARCHES DU CONTRAT ($ PREALABLE EU) Consultants SFQC1; SBQ2; SCM3; SBF4; Tous Contrats de 1 000 000 $ EU ou Plus Firmes SBQC SQC5 < 200 000 Aucun Entente Directe Pas de seuil Tous Contrats de 100 000 $ EU ou Plus Consultants ≥ 100 000 Individuels Consultant Individuel (AMI) Tous Contrats de 300 000 $ EU ou Plus Consultant Individuel (3CV) < 100 000 Entente directe Pas de Seuil Tous Contrats de 100 000 $ EU ou Plus Tous les TDR, quel que soit la valeur du Contrat, sont soumis à Examen Préalable. 3.2. Liste Restreinte composée entièrement de Consultants Nationaux : Liste Restreinte de Consultants pour Prestations de Services, d’un Coût Estimatif Inférieur à 300 000 $ US ou Equivalent par Contrat, peut être entièrement composée de Consultants Nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants. B. Liste des Marchés de SELECTION ET EMPLOI CONSULTANT Financés par la BM - BEI- UE, y-compris la Méthode de Passation de Marché : Associée et Principales Etapes. 1 2 3 4 5 8 1Sélection Fondée sur la « Qualité et le Coût » 2Sélection Fondée sur la « Qualité du Consultant » 3Sélection au « Coût Minimum » 4Sélection à « Budget Fixe » (Prédéterminé) 5- Sélection Fondée sur les « Qualifications des Consultants » CI : « Consultant Individuel » - AMI : Avis à Manifestation d’Intérêt 11 Méthod Examen par Date de Coût Ref. e de la Banque Soumis Description de la Tâche Estimé N° Sélectio (Ex Ante/Ex sion ($.US) n Post) des Proposi tions Prévue L23 - Etudes du Plan de Défense et du Plan de Reconstitution du Réseau en cas d’Incident - 100% BM Et pour gagner du Temps, SE/DQSE doit Revue A 25/07/20 1 1 700 SFQC participer à l’élaboration des TDR et dans ce Priori 17 000 cas le marché pourra être lancé en attendant les Etudes Actualisation des Schémas Directeurs 30/07/20 2 1 000 00 Revue A Production - Transport et Distribution 17 0 SFQC Priori Audit HSE, Etude Technique et Termes de Référence Démantèlement dans le Cadre du Revue A 17/07/20 3 Projet de Connexion des Centres Secondaires SFQC 286 000 Posteriori 17 de Nganda, Koungheul et Koumpentoum Assistance à la Mise en Place d'un Système de Revue A 17/07/20 4 Management des Risques: Implémentation SFQC 500 000 Posteriori 17 Outil de Gestion des Risques Assistance à la Restructuration Financière de Revue A 17/07/20 5 SENELEC 667 000 SFQC Posteriori 17 Mise en œuvre Etude Tarifaire : Elaboration 15/07/20 6 Grille Tarifaire Intégrant les Tarifs Spécifiques Revue A 17 170 000 SFQC Posteriori Assistance à la Mise en œuvre du Plan Revue A 15/07/20 7 Stratégique 420 000 SFQC Posteriori 17 12 Actualisation des Schémas Directeurs 30/07/20 8 Production - Transport et Distribution 1 000 00 Revue A 17 0 SFQC Priori 1 2 3 4 5 8 Date de Méthod Soumis Examen par Coût e de sion Ref. la Banque Description de la Tâche Estimé Sélectio des N° (Ex Ante/Ex ($.US) n Proposi Post) tions Prévue Etude Stratégique et Prospective sur la Participation à Moyen et Long Termes du 15/07/20 9 Secteur Privé dans le Secteur de l’Electricité Revue A 17 830 000 SFQC Posteriori Avenant N°2 - Audit du Contrat de Performance Etat du Sénégal – SENELEC : 30/07/20 10 Année 2017 Revue A 17 248 855 SFQC Posteriori Audit du Contrat de Performance Etat du Revue A 30/07/20 11 Sénégal – SENELEC : 2017-2019 500 000 SFQC Posteriori 17 Recrutement d'un Auditeur Externe pour la Revue A 15/07/20 12 Période 2017- 2020 60 000 SFQC Posteriori 17 Mise en œuvre des Recommandations des Audits et Etudes - Composante 3 : Upgrading 30/07/20 13 du Logiciel de Planification des Moyens de 80 000 17 Production : Acquisition Logiciel de Simulation Revue A des Energies Renouvelables CI Posteriori Etude pour la Sélection d’un Consultant Individuel pour la Réalisation des Audits Revue A 15/04/20 14 Sociaux des Projets de Connexion des Deux 61 250 CI Posteriori 17 Centres Secondaires Isolés (Tamba : Kaffrine – Kougheul – Koumpentoum & Matam : 13 Oréfondé – Ourossogui) et du Renouvèlement de la Ligne Oréfondé-Ourossogui Suivi des Mesures Environnementales et Revue A 17/07/20 15 150 000 QC Sociale Posteriori 17 Assistance Technique pour Remplacement du Revue A 17/07/20 16 10 000 CI Câble Sous-Marin Dakar – Gorée Posteriori 17 01 Auditeur Interne PASE (Recrutement d’un Revue A 30/04/20 17 Auditeur Interne pour la période 2016 – 2020) 24 100 CI Posteriori 17 1 2 3 4 5 8 Date de Méthod Soumis Examen par Coût e de sion Ref. la Banque Description de la Tâche Estimé Sélectio des N° (Ex Ante/Ex ($.US) n Proposi Post) tions Prévue 04 Ingénieurs pour la Supervision des Composantes 1 & 2 dont : ** 02 pour aider à Superviser les Travaux Exécutés dans le cadre du PASE pour « LA MISE A NIVEAU, RENFORCEMENT ET Revue A 17/07/20 19 MODERNISATION RESEAU DE TRANSPORT ET CI Posteriori 17 DE DISTRIBUTION» 96 410 ** 02 pour aider à Superviser les Marchés de Fournitures Exécutés dans le cadre du PASE pour « AMELIORATION DE LA PERFORMANCE COMMERCIALE DE LA SENELEC » 14 Seconde Mise à jour du Manuel d’Exécution du Revue A 17/05/20 20 PASE 1 afin d’intégrant les Procédures CI 17 015 Posteriori 17 relatives aux nouveaux Bailleurs (BEI, AFD, etc.) Assistance à la Mise en Place Outil de Suivi- Revue A 17/07/20 21 Evaluation 270 000 QC Posteriori 17 Assistance à l’Elaboration des Procédures 17/07/20 22 Administratives, Comptables et Financières Revue A 17 de SENELEC 125 000 QC Posteriori 15 PROCUREMENT Senegal : Electricity Sector Support Project PLAN General Information Country: Senegal Bank’s Approval Date of the Original Procurement Plan: 2017-03-16 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P125565 GPN Date: Project Name: Electricity Sector Support Project Loan / Credit No: IDA / 51450, IDA / 58920 SENEGAL NATIONAL ELECTRICITY AGENCY Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 05-TVAUX-PASE-2017 / P1A Ligne et Poste HTA (WB/EIB): Marché à 03 Lots BEI & BM Lot 1 J.1. Extension et Component 1: Upgrading and Densification de Réseau BEI Under modernization of the Single Stage - One 18,300,000.0 15,024,515. 2019-11- 7600000 & BM 400 000 IDA / 58920 Prior Request for Bids Open - International Implementat 2017-06-16 2018-11-27 2017-06-21 2018-11-30 2017-08-29 2019-01-30 2017-09-28 2019-05-15 2017-11-20 2019-07-29 Transmission and Envelope 0 37 20 Lot 2 B. Passage 6.6 à 30 kV ion Distribution Network des 2 Feeders restants à Bel Air Arsenal et Port Sud EIB 4 750 000 & BM 250 000 Lot 3 09-TVAUX-PASE-2017 / P3 Poste HTB Ligne HTA Protect Telecom Telecond EIB BM 02 Lots Lot 1 K Creation du Poste Component 1: Upgrading and Inject Guediawaye Poste HTB modernization of the Single Stage - One 31,229,000.0 26,879,883. 2020-01- IDA / 58920 Prior Request for Bids Open - International Signed 2017-07-31 2018-10-02 2017-08-05 2018-11-27 2017-10-17 2018-12-19 2017-11-16 2019-02-11 2018-01-21 2019-05-21 90 30 kV EIB BM Transmission and Envelope 0 16 21 Lot 2 Securisation Distribution Network Alimentation Electriq Clients Postes Aeroport Universite Renouvellement Cellules 30kV Non Fiables 06-TVAUX-PASE-2017 / P1B- Ligne et Poste HTA & Poste HTB & Câble Fluvial Protection Télécom et Téléconduite 3 Component 1: Upgrading and lots modernization of the Single Stage - One 12,657,330.0 8,456,544.5 2020-11- Lot 1 : L21 - Dévelop Ventes IDA / 58920 Prior Request for Bids Open - International Signed 2018-06-08 2018-10-25 2018-06-13 2018-12-13 2018-09-01 2019-01-09 2019-01-15 2019-04-02 2019-03-10 2019-07-15 Transmission and Envelope 0 8 15 et Amél Qualité Service Distribution Network Mbour, Joal, Kayar, Bayakh Lot 2 : L16 - Kédougou - P1B Bis :de SARAYA, BANDA Lot3: Rempla Câble FluV Sédh 6 BIS-TVAUX-PASE-2017 / P1B Bis - Sécurisation Component 1: Upgrading and Alimentation Electrique de modernization of the Single Stage - One 4,746,362.7 2020-08- KARMEL et Amélioration de la IDA / 58920 Post Request for Bids Open - International 5,681,000.00 Completed 2018-09-15 2019-04-17 2018-09-20 2019-04-18 2019-02-12 2019-06-19 2019-03-14 2019-07-03 2019-04-18 2019-10-30 Transmission and Envelope 5 30 Qualité de Service des Feeders Distribution Network T32 T31 Rufisque Nord et Km 22 08-TVAUX-PASE-2017 / P2B- Ligne et Poste HTA : Programme UE 2 Lots Lot 1: Pg UE Dorsales PNUER Kolda MYF+Pata+Ndorma + Component 1: Upgrading and Electrification rurale BT modernization of the Single Stage - One 13,725,000.0 2019-12- IDA / 58920 Prior Request for Bids Open - International 0.00 Canceled 2017-06-30 2017-07-05 2017-09-15 2017-10-15 2017-12-21 Lot 2: Pg UE Dorsales PNUER Transmission and Envelope 0 21 Djéné Sakar Diana Malari Distribution Network Kolda+ Vélingara Nétéboulou+Djérédji Bémet Bidjini+Electrification rurale BT 18-TVAUX-PASE-2018 / P4 Bis - Automatisation du Réseau de Distribution National -3ième Phase : 02 Lots: Lot 1 - Component 1: Upgrading and AUTOMATISATION DU RESEAU modernization of the Single Stage - One 9,099,087.5 2020-06- IDA / 58920 Post Request for Bids Open - International 8,496,250.00 Signed 2019-01-16 2019-05-22 2019-01-21 2019-05-27 2019-03-04 2019-07-24 2019-04-03 2019-08-07 2019-05-08 2019-11-29 DE DISTRIBRIBUTION Transmission and Envelope 4 30 NATIONAL 3ième Phase AU Distribution Network NIVEAU DES REGIONS - Lot 2 : INTEGRATION DES APPAREILS TELECOMMANDES AU BUREAU CENTRAL DE COND 07-TVAUX-PASE-2017 / P2A- Ligne et Poste HTA 3 Lots Lot 1 H.1. Extension et Densification Réseaux Dabo et Vélingara Component 1: Upgrading and Lot 2 : I.2. Raccordement modernization of the Single Stage - One 2021-02- IDA / 58920 Post Request for Bids Open - International 7,504,000.00 0.00 Canceled 2018-09-18 2018-12-21 2018-09-23 2018-11-04 2018-12-04 2019-02-09 Diaobé-Kounkané-Pakour et Transmission and Envelope 08 Médina Gounass à partir de Distribution Network Bokonto sur 47 km Lot 3 : I.1. Raccordement Marsasoum à partir de Tangori sur 2 10-TVAUX-PASE-2017 / P4 Poste HTB Protection Telecom Telecond BM BEI 2 Lots Lot1 L4 Automatisation Component 1: Upgrading and Distribution Telecom modernization of the Single Stage - One 2020-08- IDA / 58920 Post Request for Bids Open - International 5,000,000.00 0.00 Canceled 2018-03-15 2018-03-20 2018-12-03 2018-05-24 2018-06-23 2018-08-16 Appareils Coupures BM Transmission and Envelope 15 Lot2 J2 Renforcement Distribution Network Telecond Reseaux HTA de la Zone Centre Ouest (DRCO) EIB BM Page 1 07-TVAUX-PASE-2019 / P2A- Ligne et Poste HTA 3 Lots Lot 1 H.1. Extension et Densification Réseaux Dabo et Component 1: Upgrading and Vélingara Lot 2 : I.2. modernization of the Single Stage - One 6,486,411.9 2020-08- Raccordement Diaobé- IDA / 58920 Prior Request for Bids Open - International 7,504,000.00 Signed 2019-01-31 2019-01-17 2019-02-05 2019-01-28 2019-04-10 2019-03-20 2019-05-10 2019-10-16 2019-07-01 2019-10-11 Transmission and Envelope 8 04 Kounkané-Pakour et Médina Distribution Network Gounass à partir de Bokonto sur 47 km Lot 3 : I.1. Raccordement Marsasoum à partir de Tangori sur 2 10-TVAUX-PASE-2019 / P4 Poste HTB Protection Telecom Telecond BM BEI 2 Lots Lot1 Component 1: Upgrading and L4 Automatisation modernization of the Single Stage - One 2020-07- Distribution Telecom IDA / 58920 Prior Request for Bids Open - International 5,000,000.00 0.00 Canceled 2019-01-17 2019-01-17 2019-01-22 2019-02-05 2019-03-05 2019-02-20 2019-04-04 2019-07-16 2019-05-31 Transmission and Envelope 04 Appareils Coupures BM Lot2 Distribution Network J2 Renforcement Telecond Reseaux HTA de la Zone Centre Ouest (DRCO) EIB BM 15BIS-TVAUX-PASE-2019 / Four Petits Matériels & Travaux Sécurisation 20 000 Cantines dans 20 Marchés: Component 2. Improve Lot 1 : Travaux Cons Poste Single Stage - One 2020-02- IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - National 2,381,637.00 0.00 Canceled 2019-04-15 2019-04-20 2019-06-01 2019-07-01 2019-08-05 Transfo, Pose Réseau Distrib Envelope 01 performance BT & Four Access Réseau- Lot 2 : Travaux Instal Intér 20 000 Cantines, Sécurisation Comptages & Four Access 29-TVAUX-PASE-2019 / Component 4. Project Travaux d'Aménagement et de Pending implementation, Single Stage - One 2020-03- Sécurisation Physique des IDA / 58920 Post Request for Bids Open - National 400,000.00 0.00 Implementat 2019-06-16 2019-06-21 2019-08-02 2019-09-01 2019-10-06 Communication and Envelope 04 Emprises des Lignes HT de la ion Monitoring and Evaluation Zone des Maristes - 04 mois 30-TVAUX-PASE-2019 / Travaux d'Aménagement et de Component 4. Project Sécurisation Physique des implementation, Single Stage - One 2020-08- Emprises des Lignes HT des IDA / 58920 Post Request for Bids Open - National 252,000.00 0.00 Canceled 2019-06-30 2019-07-05 2019-08-16 2019-09-15 2020-02-26 Communication and Envelope 24 Zones de Dalifort et Poste Monitoring and Evaluation Mbao - Cap des Biches - 04 mois 31-TVAUX-PASE-2019 / Component 1: Upgrading and Remplacement Câble Fluvial modernization of the Single Stage - One 1,666,549.1 2020-09- IDA / 58920 Post Request for Bids Limited 2,250,000.00 Signed 2019-08-30 2019-09-26 2019-09-04 2019-09-26 2019-10-16 2019-10-30 2019-11-15 2019-11-07 2019-12-20 2020-02-20 de Sédhiou - 31-Tvaux-PASE- Transmission and Envelope 5 15 2019 - 09 mois Distribution Network 32-TVAUX-PASE-2019 / P4 - Poste HTB Protection, Télécom & Téléconduite : 02 Lots - 09 mois: Lot - Automatisation de Component 1: Upgrading and la Distribution avec la modernization of the Single Stage - One 3,515,707.3 2020-09- Télécommande des Appareils IDA / 58920 Prior Request for Bids Open - International 5,000,000.00 Signed 2019-08-30 2019-08-09 2019-09-04 2019-08-26 2019-10-16 2019-10-23 2019-11-15 2019-11-18 2019-12-20 2019-12-24 Transmission and Envelope 3 15 de Coupures: 100% BM & Distribution Network Lot2-Renforcement Téléconduite Réseaux HTA de la Zone Centre Ouest : BM 7% & BEI 93% 30-TVAUX-PASE-2021 / National Component 4. Project Travaux d’Aménagement et Procurement Pending implementation, Single Stage - One 2022-03- de Sécurisation Physique des IDA / 58920 Post Request for Bids Open - National Document - 1 252,000.00 0.00 Implementat 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 Communication and Envelope 19 Emprises des Lignes HT des Envelope process ion Monitoring and Evaluation Zones de Dalifort – 04 mois (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01-FOUR-PASE-2017 / Component 4. Project Acquisition de Matériel implementation, Request for Single Stage - One IDA / 51450 Post Limited 100,000.00 20,470.03 Completed 2017-03-20 2017-03-13 2017-05-15 2017-06-12 2017-08-13 2017-07-27 Informatique UEP et Personnel Communication and Quotations Envelope Complémentaire Monitoring and Evaluation 04-FOURSERV-PASE-2017 / Acquisition d'un Logiciel de Component 4. Project Gestions Financière - implementation, Request for Single Stage - One IDA / 51450 Post Limited 30,000.00 0.00 Canceled 2017-04-21 2017-06-16 2017-12-13 Passation des Marchés et Suivi Communication and Quotations Envelope - Evaluation (Acquisition & Monitoring and Evaluation Installation) FOUR-PASE1-NSIC- 2016/2017 / Fourniture et Component 2. Improve Single Stage - One Installation d un Nouveau IDA / 51450 SENELEC’s commercial Prior Request for Bids Open - International 10,000,000.00 8,962,257.61 Signed 2017-05-23 2017-05-28 2017-07-09 2017-08-08 2017-05-31 2017-09-12 2017-03-17 2019-09-12 Envelope Systeme de Gestion de la performance Clientele NSIC 13-FOUR-PASE-2017 / P6A Fourn Mat. Instal Compteurs et Autres Lot1 D2 Acquis Mat Pose Component 2. Improve 40000Comp Marches Single Stage - One IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 8,901,000.00 0.00 Canceled 2017-05-31 2017-06-05 2017-07-26 2017-08-25 2017-10-20 2019-10-20 Lot2 D3 Acquis Mat Reprise Envelope performance Reseau 20 Marches Lot3 D4 Acquis Lat Instal Inter Environ 12500 Clients Faibles Revenus 17-FOUR ET SERV-2017- PASE / ACQUISITION ET INSTALLATION EN URGENCE D UN PYLÔNE PROVISOIRE EN Component 1: Upgrading and REMPLACEMENT DU PYLÔNE Pending modernization of the 16 DE LA LIGNE CH91 HANN - IDA / 58920 Post Direct Selection Direct 200,000.00 0.00 Implementati 2017-10-20 2017-10-25 2017-11-29 2018-05-28 Transmission and CAP DES BICHES on Distribution Network ** Acquisition et Installation d'un Pylône Provisoire ** Formation sur Site d'une Dizaine de Personnes Page 2 13-14-FOURSER-2017-PASE / Lot 1:D-4 et D5: Acquisition pour Installation Intérieure Component 2. Improve d'Environ 12 500 Clients à Single Stage - One IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 7,250,000.00 0.00 Canceled 2018-01-22 2018-01-27 2018-04-09 2018-06-27 2020-06-26 Faible Revenus et Lot 2 : C- Envelope performance Fourniture et Installation Intérieure d'Environ 25 000 Clients à Faibles Revenus 16-FOUR-PASE-2018 / Component 4. Project Acquisition de Matériel et implementation, Request for Single Stage - One IDA / 58920 Post Limited 15,000.00 11,037.95 Completed 2018-07-21 2018-05-29 2018-09-15 2018-10-10 2018-11-14 2018-12-21 Mobilier de Bureau Communication and Quotations Envelope Complémentaire UEP PASE Monitoring and Evaluation 17-FOUR-PASE-2018 / Acquisition d'une Imprimante Component 4. Project Réseau Multifonctions Couleur implementation, Request for Single Stage - One : IDA / 58920 Post Limited 17,000.00 13,007.88 Signed 2018-10-21 2018-10-23 2018-12-16 2018-12-21 2019-06-14 Communication and Quotations Envelope HP Color Laserjet Entreprise Monitoring and Evaluation Flow MFP M880Z+ ou équivalent 14-FOURSER-PASE-2018 / D- 4 & C Acquisition de Petits Matériels pour Installation Intérieure d'Environ 37 500 Clients à Faibles Revenus et D- Component 2. Improve Single Stage - One 5 Installation Intérieure IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - National 3,473,500.00 0.00 Canceled 2018-08-31 2018-09-05 2018-10-17 2018-12-14 2019-02-28 2020-02-13 Envelope d'Environ 37 500 Clients à performance Faibles - Four & Pose Installations Intérieures Electriques Marché à 01 Seul Lot 13-FOUR-PASE-2018 / D-4 & C Acquisition de Matériels Component 2. Improve Spécifiques pour Installation Single Stage - One IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 7,845,250.00 0.00 Canceled 2018-08-31 2018-09-05 2018-10-17 2018-11-16 2019-01-24 2019-07-23 Intérieure d'Environ 37 500 Envelope performance Clients à Faibles Revenus: Marché à 01 Seul et unique Lot 13-FOUR-PASE-2019 / Fourniture de Matériels Spécifiques pour Installation Intérieure 37500 Ménage à Component 2. Improve Single Stage - One Faibles Revenus (MFR): 02 IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 10,600,000.00 0.00 Canceled 2019-01-16 2019-03-20 2019-01-21 2019-05-21 2019-03-04 2019-05-29 2019-04-03 2019-07-16 2019-05-08 2019-11-04 Envelope Lots Indépendants - BM 07 et performance BEI 93: Lot 1: Fourniture Câble & Supports - Lot 2 : Coffrets et Appareillages 25-FOUR/SER-PASE-2019 / Acquisition - Installation et Component 4. Project Initiation d'un logiciel de MS implementation, Request for Single Stage - One IDA / 58920 Post Limited 3,000.00 1,096.32 Signed 2019-03-05 2019-01-29 2019-04-30 2019-01-29 2019-10-27 Project et formation pour le Communication and Quotations Envelope suivi de tous les projets du Monitoring and Evaluation PASE 25-FOUR-PASE-2019 / Four Matériel Branchement Anti- fraude pour Sécurisation Component 2. Improve 50000 Clients Quartiers Single Stage - One IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 10,924,624.00 0.00 Canceled 2019-03-29 2019-04-08 2019-04-03 2019-06-18 2019-05-15 2019-06-26 2019-06-14 2019-12-18 2019-07-19 2020-03-15 Difficiles: Lot 1:Four Câbles Envelope performance Concentriq & Access Associés - Lot 2:Four Coffret Comptage & Matériels Sécurisation. 22-PASE-FOUR/SER-2019 / Acquisition et Installation d'un Système de Télésurveillance Component 4. Project pour un Immeuble de 4 implementation, Request for Single Stage - One Etages & Acquisition et IDA / 58920 Post Limited 40,000.00 0.00 Canceled 2019-03-27 2019-05-22 2019-08-20 Communication and Quotations Envelope Installation d'un Système Monitoring and Evaluation d'Accés Numérique avec Logiciel et Poste de Traitement pour UEP 27-FOUR-PASE-2019 / Component 4. Project Fourniture - Installation - implementation, Request for Single Stage - One Formation à l'utilisation IDA / 58920 Post Limited 2,000.00 1,555.38 Completed 2019-03-20 2019-04-16 2019-05-15 2019-06-24 2019-08-13 2020-09-30 Communication and Quotations Envelope LOGICIEL Elaboration Etats Monitoring and Evaluation Financiers SYSCOHADA Révisé 24-FOUR/SER-PASE-2019 / Component 4. Project Recrutement d'une Structure implementation, Request for Single Stage - One de Gardiennage : Gardiennage IDA / 58920 Post Limited 24,000.00 0.00 Canceled 2019-03-25 2019-05-20 2019-11-16 Communication and Quotations Envelope à Réformer avec une Structure Monitoring and Evaluation Qualifiante dans le Domaine 15-FOUR-PASE-2019 / Fourniture de Matériels Electriques Spécifiques pour Sécurisation 20 000 Cantines dans 20 Marchés-Lot 1: Four Component 2. Improve Single Stage - One Postes Transfo, Câbles & IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 6,518,892.00 0.00 Canceled 2019-03-15 2019-04-09 2019-03-20 2019-05-14 2019-05-24 2019-07-10 2019-07-28 2020-02-23 Envelope Supports BT-Lot 2: Fourniture performance Coffrets & Appareillages Electriques-Lot 3 : Four Chemins de Câbles et des tubes IRO 28-FOUR/SER-PASE-2019 / Component 4. Project Acquisition d'un Logiciel de implementation, Planification de la Production IDA / 58920 Post Direct Selection Direct 500,000.00 464,606.56 Signed 2019-03-31 2019-02-07 2019-04-05 2019-03-05 2019-05-10 2020-08-26 2019-11-06 Communication and et Assistance Technique avec Monitoring and Evaluation Plexos 15 BIS-FOUR/SER-PASE-2019 / Four Petits Mat & Install pour Sécuris 20000 Cantin dans 20 marchés DC1-DC2- DRCE-DRN-DRCO-DRS : Lot1- Component 2. Improve Single Stage - One 5mois 27.78 Construc Poste IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 2,381,637.00 1,245,103.44 Signed 2019-04-15 2019-04-09 2019-04-20 2019-04-29 2019-06-01 2019-06-12 2019-07-01 2019-11-19 2019-08-05 2020-09-07 2020-03-02 Envelope Transfo, Pose Réseau Distrib performance BT, Four Accesso Réseau - Lot2-7mois 78.22 Install Intér 20000 Canti, Sécuris Compta, Four Accessoi Page 3 Component 4. Project 21-FOURBIS-PASE-2019 / implementation, Request for Single Stage - One Acquisition de 02 Véhicules IDA / 58920 Post Limited 160,000.00 158,309.83 Completed 2019-04-04 2019-07-08 2019-05-30 2019-09-25 2019-08-28 2020-01-28 Communication and Quotations Envelope 4X4 pour les Missions de l'UEP Monitoring and Evaluation 19-FOUR-PASE-2019 / Acquisition Mat. & Mob. de Bur UEP: 2 Fauteuil Ortho + 2faut. visiteurs + 2Vidéos Component 4. Project Projeteurs + 01 Frigo + 01 implementation, Request for Single Stage - One IDA / 58920 Post Limited 18,000.00 11,824.64 Completed 2019-06-04 2019-07-08 2019-07-30 2019-10-30 2019-09-28 2020-02-06 Scanner à Plat HP 7500 + 01 Communication and Quotations Envelope Ecran Affic +01 Ecran Télé 75 Monitoring and Evaluation Pouc Projection + 01 Table & 12 Chaises Réunion + 01 Salon Cuir 5Places & Table 12-FOUR-PASE-2017 / P5 Component 2. Improve 300 000 Compteurs Single Stage - One IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 11,250,000.00 0.00 Canceled 2017-05-30 2017-06-04 2017-07-16 2017-08-15 2017-10-10 2019-10-10 Modulaires a Paiement Envelope performance Prealable BEI BM 13BIS-FOUR-PASE-2019 / Fourniture de Matériels Spécifiques pour Installation Intérieure 37500 Ménage Faibles Revenus: Lot1 Component 2. Improve Single Stage - One Fourniture de Câble & IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 10,600,000.00 6,503,423.59 Signed 2019-08-30 2019-11-07 2019-09-04 2019-11-11 2019-10-16 2019-12-18 2019-11-15 2020-02-25 2019-12-20 2020-05-27 2020-07-17 Envelope Supports- Lot 2 Fourniture de performance Coffrets & Appareillages- Lot3 Fourniture de Matériels Electriques- Lot 4 Fourniture de Poteaux en Bois 14BIS-FOUR-PASE-2019 / Four Petits Mat, Pose, Instal Intér & Branch. 37500 MFR: DAKAR : Lot 1 - DC1 et DC2 : 4 500 MFR, DRCO : Lot 2 - Component 2. Improve Single Stage - One 750 MFR & Lot 3 - 37500 IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 4,080,000.00 2,998,150.13 Signed 2019-09-30 2019-12-30 2019-10-05 2020-01-07 2019-11-16 2020-02-26 2019-12-16 2020-04-07 2020-01-20 2020-09-07 2020-09-16 Envelope MFR; DRCE : Lot 4 - 250 MFR performance & Lot 5 - 250 MFR; DRN : Lot 6 - 250 MFR; Lot 7 - 250 MFR, DRS: Lot 8 - 250 MFR; Lot9: 250 15 RELANCE-FOUR-PASE- 2019 / Four. Mat. Elect. Spécifiq. Sécuris. 20000 Cantines dans 20 Marchés : 03 Lot -06 mois: Lot 1Four Component 2. Improve Single Stage - One Postes Transform (2 729 IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 6,518,892.00 3,552,125.63 Signed 2019-11-22 2019-12-30 2019-11-27 2020-01-07 2020-01-08 2020-02-26 2020-02-07 2020-03-17 2020-03-13 2020-06-22 2020-09-09 Envelope 284USD), Câbles & Suppor BT performance - Lot2 Four Coffrets & Appareillages Electriq. (2 965 408USD) - Lot3 Four Chemins Câbles Tubes IRO (824 20 20-FOUR-PASE-2019 / Acquisition d'une Imprimante Réseau Multifonctions Couleur Component 4. Project : HP Color Laserjet Entreprise implementation, Request for Single Stage - One IDA / 58920 Post Limited 10,450.00 0.00 Canceled 2019-06-04 2019-07-08 2019-07-30 2019-09-28 Flow MFP M880Z+ ou Communication and Quotations Envelope équivalent et 06 Ordinateurs Monitoring and Evaluation Surface pour Equipe UEP - PASE 25BIS-FOUR-PASE-2020 / Four. Mat. Branch. Anti- fraude pour Sécu. 50 000 Clients Quartiers Diff. : BM7% Component 2. Improve Single Stage - One - BEI 3%: Lot 1- Four. Câbles IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 10,924,624.00 2,169,288.99 Signed 2020-03-17 2020-07-10 2020-03-22 2020-07-24 2020-05-03 2020-09-23 2020-06-02 2020-12-15 2020-06-18 2021-02-04 2020-12-15 Envelope Concentriq & Access Associés: performance 8 554 030 USD - Lot2-Four Coffrets Comptag & Mat. Sécuris: 2 370 600 USD SN-SENELEC-99362-GO-RFB / Fourniture de Matériels Electriques Spécifiques pour Sécurisation 20 000 Cantines dans 20 Marchés-Lot 1: Four Component 2. Improve Single Stage - One Postes Transfo, Câbles & IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 6,518,892.00 0.00 Canceled 2019-03-15 2019-03-20 2019-05-24 2019-07-28 2020-02-23 Envelope Supports BT-Lot 2: Fourniture performance Coffrets & Appareillages Electriques-Lot 3 : Four Chemins de Câbles et des tubes IRO 03-FOURSERV-PASE-2017 / Campagne de Communication Component 2. Improve Request for Single Stage - One des Compteurs Intelligents IDA / 51450 SENELEC’s commercial Post Limited 20,000.00 0.00 Canceled 2017-04-21 2017-06-16 2017-09-26 Quotations Envelope Forums avec clients Grands performance Comptes Component 4. Project 21-FOUR-PASE-2019 / implementation, Single Stage - One Acquisition de 02 véhicules IDA / 58920 Post Request for Bids Open - National 160,000.00 0.00 Canceled 2019-03-29 2019-04-03 2019-05-15 2019-06-14 2019-07-19 2019-10-17 Communication and Envelope 4X4 pour les Missions de l'UEP Monitoring and Evaluation 11-FOUR-PASE-2017 / P5 Component 2. Improve Fourniture 260 000 Single Stage - One IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 8,333,000.00 0.00 Canceled 2017-03-30 2017-04-04 2017-04-12 2017-05-30 2017-05-03 2017-06-29 2017-07-13 2017-08-22 2019-08-22 Compteurs Modulaires a Envelope performance Paiement Prealable 34-FOUR-PASE-2020 / Acquisition de Machines de Component 4. Project Transformation de Céréales et implementation, Request for Single Stage - One Légumineuses au Profit de IDA / 58920 Post Limited 134,024.00 100,734.14 Signed 2020-12-20 2020-11-30 2021-02-14 2021-04-02 2021-04-15 Communication and Quotations Envelope Groupements des Femmes sur Monitoring and Evaluation l’Axe Kédougou- Fongolimbi et Guédiawaye Page 4 35-FOUR-PASE-2020 / Acquisition de Matériels Electroménagers et Solaires Component 4. Project pour Transformations de implementation, Request for Single Stage - One IDA / 58920 Post Limited 13,891.00 44,518.00 Signed 2020-12-20 2021-03-26 2021-02-14 2021-06-14 2021-04-15 Céréales, Fruits, Légumes et Communication and Quotations Envelope Restauration au Profit de Monitoring and Evaluation Groupements de Femmes à Guédiawaye 36-FOUR-PASE-2020 / Acquisition de Petits Matériels Component 4. Project de Transformation de implementation, Request for Single Stage - One Céréales Locales (TCL), Fruits IDA / 58920 Post Limited 6,603.00 40,712.73 Signed 2020-12-26 2021-03-26 2021-02-20 2021-06-14 2021-04-21 Communication and Quotations Envelope et Légumes (TFL) au Profit de Monitoring and Evaluation Groupements de Femmes à Guédiawaye 37-FOUR-PASE-2020 / Matériels d’Appui pour l’Irrigation, les Intrants pour Component 4. Project Pending Maraichage et jardinage au implementation, Request for Single Stage - One IDA / 58920 Post Limited 10,018.00 0.00 Implementati 2020-12-26 2021-02-20 2021-04-21 Profit de Femmes Maraichères Communication and Quotations Envelope on à Guédiawaye et de Monitoring and Evaluation Maraichères & Jardinières du Technopole (Pikine) 38-FOUR-PASE-2020 / Component 4. Project Acquisition de Matériels Pending implementation, Request for Single Stage - One Informatique et d’Appui pour IDA / 58920 Post Limited 6,341.00 0.00 Implementati 2021-01-02 2021-02-27 2021-04-28 Communication and Quotations Envelope la Sérigraphie au Profit de on Monitoring and Evaluation Jeunes de Guédiawaye 39-FOUR-PASE-2020 / Acquisition de Description Component 4. Project Technique de Matériels Pending implementation, Request for Single Stage - One d’Appui pour Aviculture au IDA / 58920 Post Limited 2,645.00 0.00 Implementati 2021-01-02 2021-02-27 2021-04-28 Communication and Quotations Envelope Profit de Groupement de on Monitoring and Evaluation Femmes Avicultrice à Guédiawaye 40-FOUR-PASE-2020 / Component 4. Project Acquisition de Matériels Pending implementation, Request for Single Stage - One d’Appui pour la Saponification IDA / 58920 Post Limited 6,599.00 0.00 Implementati 2021-01-16 2021-03-13 2021-05-12 Communication and Quotations Envelope et la Couture au profit de on Monitoring and Evaluation Jeunes Femmes à Guédiawaye 41-FOUR-PASE-2020 / Acquisition de Matériels Roulant (Motos) au profit du Component 4. Project Foyer des Femmes de implementation, Request for Single Stage - One IDA / 58920 Post Limited 14,921.00 21,058.31 Signed 2021-01-16 2021-03-26 2021-03-13 2021-06-14 2021-05-12 Fongolimbi, des Femmes Communication and Quotations Envelope Avicultrices à Guédiawaye et Monitoring and Evaluation Maraîchères du Technopole (Pikine) 42-FOUR-PASE-2020 / Component 4. Project Acquisition de 04 Ordinateurs implementation, Request for Single Stage - One IDA / 58920 Post Limited 6,220.00 5,523.62 Signed 2020-12-13 2020-11-25 2021-02-07 2021-02-04 2021-04-08 Portables pour Equipe UEP Communication and Quotations Envelope PASE. Monitoring and Evaluation 43-FOUR-PASE-2021 / Acquisition Matériel de Sécurisation Câble Component 2. Improve Under Branchement et Réseau MT IDA / 58920 SENELEC’s commercial Post Direct Selection Direct 1,000,000.00 0.00 Implementati 2021-04-28 2021-04-02 2021-05-03 2021-06-04 2021-06-07 2021-09-05 pour 06 Semaines : Câble performance on préassemblé 2x16 mm² & Câble préassemblé 4x16 mm² (au Profit de Senelec – DAPA) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 14-FOURSERV-PASE-2017 / D5 et C Instal Int Clients Faibles Revenus Lot1 D5 Instal Component 2. Improve Intér Environ 12500 Clients a Single Stage - One IDA / 58920 SENELEC’s commercial Post Request for Bids Open - National 5,250,000.00 0.00 Canceled 2017-06-30 2017-07-05 2017-08-16 2017-09-15 2017-10-20 2018-10-15 Faible Revenus BM Lot2 C Envelope performance Instal Intér Environ 25000 Clients a Faible Revenus BM et BEI 14-FOUR/SER-PASE-2019 / Fourniture Petits Matériels, Pose, Installations Intérieures Component 2. Improve et Branchement de 37500 Single Stage - One IDA / 58920 SENELEC’s commercial Prior Request for Bids Open - International 4,080,000.00 0.00 Canceled 2019-01-31 2019-03-18 2019-02-05 2019-04-11 2019-03-19 2019-05-29 2019-04-18 2019-07-29 2019-05-23 2020-03-18 Ménages à Faible Revenus Envelope performance (MFR) : 09 Lots (DK 01 - DRCO 02 - DRCE02 - DRN 02 - DRS 02) 26-FOUR/SER-PASE-2019 / Four Petits Matériels & Travaux Mise aux Normes Installations Electriques: Lot1:10 000Clients Dakar1, Component 2. Improve Single Stage - One Lot2:10 000Clients Dakar2, IDA / 58920 SENELEC’s commercial Post Request for Bids Open - International 1,448,300.00 689,989.35 Signed 2019-04-30 2019-06-14 2019-05-05 2019-06-14 2019-06-16 2019-08-07 2019-07-16 2019-08-21 2019-08-20 2021-06-21 2020-04-16 Envelope Lot3:5 000Clients Dakar2, performance Lot4:10 000Clients DRCO, Lot5 : 5000Clients DRN, Lot6 :5000Clients DRS, Lot7:5000Clinets DRCE CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01-CONS-PASE-2017 / Suivi Consultant Component 3. Long term des Mesures IDA / 51450 Post Qualification Open - National 150,000.00 0.00 Canceled 2017-06-30 2017-07-21 2017-09-03 2017-10-03 2017-11-07 2020-11-06 strategic outlook Environnementales et Sociale Selection Page 5 05-CONS-PASE-2017 / Audit HSE Etude Technique et TDR Demantelement dans le Cadre Component 3. Long term Quality And Cost- du Projet de Connexion des IDA / 51450 Post Open - National 286,000.00 0.00 Canceled 2017-06-30 2017-07-21 2017-09-03 2017-10-01 2017-10-31 2017-12-05 2018-01-09 2019-01-09 strategic outlook Based Selection Centres Secondaires de Nganda Koungheul et Koumpentoum 13-CONS-PASE-2017 / Actualisation des Schemas Component 3. Long term Quality And Cost- IDA / 58920 Prior Open - International 1,000,000.00 1,823,330.18 Signed 2017-06-30 2017-04-18 2017-07-21 2017-06-01 2017-09-03 2017-10-11 2017-10-31 2017-11-30 2018-05-22 2018-01-04 2018-11-28 2018-02-21 2018-12-21 2020-02-21 Directeurs Production strategic outlook Based Selection Transport et Distribution 17-CONS-PASE-2017 / Recrutement d un Auditeur Component 3. Long term Quality And Cost- Pending IDA / 58920 Post Open - National 60,000.00 0.00 2017-06-30 2017-07-21 2017-09-03 2017-10-31 2017-11-30 2018-01-21 2018-03-21 2019-03-21 Externe pour la Periode 2017 strategic outlook Based Selection Implementation 2020 20-CONS-PASE-2017 / L23 Etudes du Plan de Defense et Component 3. Long term Quality And Cost- IDA / 58920 Prior Open - International 1,700,000.00 1,081,282.35 Signed 2017-06-30 2017-04-18 2017-07-21 2017-09-21 2017-09-03 2018-06-01 2017-10-31 2017-11-30 2018-11-06 2018-01-21 2019-02-28 2018-03-21 2019-03-22 2020-03-20 du Plan de Reconstitution du strategic outlook Based Selection Réseau en cas d Incident 07-CONS-PASE-2013 / DP- N20-2013 Audit du Contrat Component 3. Long term Quality And Cost- Under IDA / 51450 Post Open - International 552,000.00 0.00 2014-02-26 2014-03-19 2014-05-02 2014-05-30 2014-06-29 2014-08-03 2014-09-07 2017-09-06 de Performance Etat du strategic outlook Based Selection Implementation Sénégal - Senelc - R18 16-CONS-PASE-2017 / Audit du Contrat de Performance Component 3. Long term Quality And Cost- IDA / 58920 Prior Open - International 500,000.00 328,073.37 Signed 2017-06-30 2017-05-29 2017-07-21 2017-07-27 2017-09-03 2017-10-13 2017-10-31 2017-12-06 2017-11-30 2018-03-06 2018-01-21 2018-08-09 2018-03-21 2018-09-17 2020-03-20 Etat du Sénégal - SENELEC : strategic outlook Based Selection 2017-2019 14-CONS-PASE-2017 / Etude Strategique et Prospective sur Component 3. Long term Quality And Cost- la Participation à Moyen et IDA / 58920 Post Open - International 830,000.00 0.00 Canceled 2017-06-30 2017-07-21 2017-09-03 2017-10-31 2017-11-30 2018-01-20 2018-03-21 2020-03-20 strategic outlook Based Selection Long Termes du Secteur Prive dans le Secteur de l Electricite 08-CONS-PASE-2017 / Consultant Component 3. Long term Assistance à la Mise en Place IDA / 58920 Post Qualification Open - National 270,000.00 0.00 Canceled 2017-06-30 2017-07-21 2017-09-03 2017-10-03 2017-11-21 2018-11-21 strategic outlook d un Outil de Suivi Evaluation Selection 44-CONS-PASE-2018 / Recrutement d'un Consultant Component 1: Upgrading and -Structure Facilitatrice pour la modernization of the Least Cost IDA / 58920 Post Open - National 160,000.00 89,220.91 Signed 2018-09-05 2019-08-09 2018-09-26 2018-11-09 2019-02-27 2018-12-07 2019-01-23 2019-01-06 2019-02-22 2019-02-10 2019-02-27 2019-04-28 2019-05-10 2019-12-14 Mise en œuvre du PAR : Transmission and Selection Cabinet : Tronçon Hann - Cap Distribution Network des Biches : 07 mois 34-CONS-PASE-2018 / Recrutement Bureaux Contrôle et Suivi des Travaux Remise en Etat et Component 1: Upgrading and Modernisation Réseaux modernization of the Quality And Cost- IDA / 58920 Prior Open - National 1,992,000.00 0.00 Canceled 2018-11-15 2018-11-19 2018-12-06 2019-01-29 2019-03-05 2019-04-04 2019-05-22 2019-06-26 2020-09-18 Distribution de Senelec, dans Transmission and Based Selection le cadre du PASE 2 (09 à 18 Distribution Network mois): Lot 1: Zone de Dakar et Environs & Lot 2: Zone Sud (Ziguinchor, Kédougou, Sédhiou, ...) 22-CONS-PASE/2017 / Etude pour l EVALUATION DE LA REGULATION ET LA MISE EN Component 3. Long term Quality And Cost- IDA / 58920 Post Open - International 900,000.00 0.00 Canceled 2017-12-14 2017-10-24 2018-01-04 2018-04-15 2018-06-13 2018-07-13 2018-08-17 2018-12-15 2020-12-14 PLACE D'UN ORGANE DE strategic outlook Based Selection REGULATION DU SECTEUR DE L'ENERGIE Au SENEGAL 49-CONS-PASE-2019 / Recrutement d'un Consultant Consultant Component 3. Long term pour « une Etude pour Mettre IDA / 58920 Post Qualification Open - International 150,000.00 148,084.15 Signed 2019-01-31 2018-12-18 2019-02-21 2019-04-06 2019-02-13 2019-05-06 2019-03-12 2019-06-10 2019-04-17 2019-10-08 strategic outlook Fin au Monopole de Senelec - Selection 03 mois 51-CONS-PASE-2019 / Component 4. Project Recrutement d'un Consultant Consultant implementation, -Structure Facilitatrice pour la IDA / 58920 Post Qualification Open - National 200,000.00 93,757.54 Signed 2019-02-13 2019-07-17 2019-03-06 2019-04-19 2019-08-07 2019-05-19 2019-12-09 2019-06-23 2019-12-30 2020-03-19 Communication and Mise en œuvre du PAR de Selection Monitoring and Evaluation Dakar - 07 mois 52-CONS-PASE-2019 / Component 4. Project Recrutement d'un Consultant Consultant implementation, -Structure Facilitatrice pour la IDA / 58920 Post Qualification Open - National 200,000.00 68,769.68 Signed 2019-01-30 2019-07-19 2019-02-20 2019-04-05 2019-08-21 2019-05-05 2019-12-09 2019-06-09 2019-12-30 2020-03-05 Communication and Mise en œuvre du PAR de Selection Monitoring and Evaluation Kédougou - 07 mois 54-CONS-PASE-2019 / Recrutement d'un Consultant Component 4. Project Consultant pour la Réalisation de l'étude implementation, IDA / 58920 Post Qualification Open - National 100,000.00 0.00 Canceled 2019-02-21 2019-03-14 2019-04-27 2019-05-27 2019-07-01 2019-12-28 d'impact socioéconomique Communication and Selection des Réalisations du PASE - 04 Monitoring and Evaluation mois 09-CONS-PASE-2017 / Assistance a l Elaboration des Consultant Component 3. Long term Procedures Administratives IDA / 58920 Post Qualification Open - National 125,000.00 0.00 Canceled 2017-06-30 2017-07-21 2017-09-13 2017-10-13 2017-11-21 2019-11-21 strategic outlook Comptables et Financieres de Selection SENELEC 07-CONS-PASE-2017 / Assistance a la Mise en Place Component 3. Long term Quality And Cost- d un Systeme de Management IDA / 58920 Post Open - International 500,000.00 0.00 Canceled 2017-06-30 2017-07-21 2017-09-03 2017-10-01 2017-10-31 2017-12-05 2018-01-09 2019-01-09 strategic outlook Based Selection des Risques Implémentation Outil de Gestion des Risques 11-CONS-PASE-2017 / Mise en œuvre Etude Tarifaire Component 3. Long term Quality And Cost- Elaboration Grille Tarifaire IDA / 58920 Post Open - International 170,000.00 0.00 Canceled 2017-06-30 2017-04-07 2017-07-21 2017-07-11 2017-09-14 2017-10-12 2017-11-11 2017-12-16 2018-01-20 2020-01-20 strategic outlook Based Selection Integrant les Tarifs Specifiques Page 6 34-CONS-PASE-2019 / Recrutement Bureaux Contrôle et Suivi Travaux, Component 1: Upgrading and Remise en Etat et modernization of the Quality And Cost- Modernisation Réseaux IDA / 58920 Prior Open - International 3,560,000.00 1,848,851.50 Signed 2019-02-28 2019-01-18 2019-03-21 2019-02-21 2019-05-04 2019-06-19 2019-06-01 2019-08-07 2019-07-01 2019-09-30 2019-08-05 2020-01-03 2019-10-15 2020-01-28 2020-10-09 Transmission and Based Selection Distribution de Senelec (09 à Distribution Network 18 mois): Lot 1 : Dakar et & Environs- Lot2: Zone Sud (Ziguinchor, Kédougou, Sédhiou, ...) 45-CONS-PASE-2018 / Component 1: Upgrading and Recrutement d'un Consultant Consultant modernization of the pour la Réalisation du Plan IDA / 58920 Post Qualification Open - National 100,000.00 83,580.21 Signed 2019-02-06 2018-12-05 2019-02-27 2019-04-12 2019-01-02 2019-05-12 2019-03-06 2019-06-16 2019-04-05 2019-09-14 Transmission and d'Action de Compensation à Selection Distribution Network Dakar : 02 mois 45BIS-CONS-PASE-2018 / Component 1: Upgrading and Recrutement d'un Consultant Consultant modernization of the pour la Réalisation du Plan IDA / 58920 Post Qualification Open - National 100,000.00 84,840.28 Signed 2019-02-06 2018-12-05 2019-02-27 2019-04-12 2019-01-18 2019-05-12 2019-02-01 2019-06-16 2019-04-05 2019-09-14 Transmission and d'Action de Compensation à Selection Distribution Network Kédougou: 02 mois 34-CONS-PASE-2017 / Component 1: Upgrading and Recrutement d une Equipe de Consultant modernization of the Consultant Chargée du IDA / 58920 Post Qualification Open - National 105,000.00 0.00 Canceled 2018-09-10 2018-10-01 2018-11-14 2018-12-14 2019-01-18 2020-10-29 Transmission and Controle et Suivi des Selection Distribution Network Chantiers 56-CONS-PASE-2019 / Component 4. Project Consultant Recrutement d'un Consultant implementation, IDA / 58920 Post Qualification Open - National 100,000.00 0.00 Canceled 2019-03-29 2019-04-19 2019-06-02 2019-07-02 2019-08-06 2020-07-31 pour l'Evaluation des Besoins Communication and Selection en Sauvegarde de Senelec Monitoring and Evaluation 47-CONS-PASE-2019 / Assistance Technique sur la Component 3. Long term Quality And Cost- IDA / 58920 Post Open - International 490,000.00 452,106.91 Completed 2019-04-15 2019-05-03 2019-05-06 2019-05-08 2019-06-19 2019-08-14 2019-07-17 2019-10-02 2019-08-16 2019-10-09 2019-09-20 2019-11-13 2019-10-25 2020-03-24 2020-10-24 2021-02-02 Stratégie Gaz To Power de strategic outlook Based Selection Senelec 53-CONS-PASE-2019 / Component 4. Project Recrutement d'un Consultant Consultant implementation, -Structure Facilitatrice pour la IDA / 58920 Post Qualification Open - National 200,000.00 341,923.12 Signed 2019-02-27 2019-07-19 2019-04-15 2019-05-29 2019-08-07 2019-06-28 2019-12-19 2019-08-02 2020-01-14 2020-04-28 Communication and Mise en œuvre du PAR de Selection Monitoring and Evaluation Kolda- 07 mois 53BIS-CONS-PASE-2019 / Component 4. Project Recrutement d'un Consultant Consultant implementation, -Structure Facilitatrice pour la IDA / 58920 Post Qualification Open - National 160,000.00 142,269.52 Signed 2019-04-15 2019-07-29 2019-05-06 2019-06-19 2019-08-07 2019-07-19 2019-12-07 2019-08-23 2020-01-27 2020-02-19 Communication and Mise en œuvre du PAR de Selection Monitoring and Evaluation Ziguinchor- 07 mois 45 BIS 2-CONS-PASE-2018 / Recrutement d'un Consultant Component 1: Upgrading and Consultant pour la Réalisation du Plan modernization of the IDA / 58920 Post Qualification Open - National 300,000.00 294,726.26 Signed 2019-02-26 2018-12-05 2019-03-19 2019-05-02 2019-01-18 2019-06-01 2019-03-20 2019-07-06 2019-04-19 2019-10-04 d'Action de Compensation au Transmission and Selection Sud Kolda, Ziguinchor: 02 Distribution Network mois 34 BIS-CONS-PASE-2019 / Recrutement Bureaux Contrôle & Suivi Environ. & Social, Remise en Etat Component 1: Upgrading and Modernis. Réseaux Transport modernization of the Quality And Cost- Senelec: Poste HTB 90/30 kV IDA / 58920 Prior Open - National 1,101,340.00 0.00 Canceled 2019-04-15 2019-05-06 2019-06-19 2019-07-17 2019-08-16 2019-09-20 2019-10-25 2020-10-24 Transmission and Based Selection - Ligne et Poste HTA: Distribution Network Protection, Télécom & Téléconduite : Création Poste Injecteur Guédiawaye & Environs - 18 mois 12-CONS-PASE-2017 / Component 3. Long term Quality And Cost- Assistance a la Mise en œuvre IDA / 58920 Post Open - International 420,000.00 0.00 Canceled 2017-06-30 2017-07-21 2017-09-03 2017-10-31 2017-11-30 2018-01-04 2018-02-08 2020-02-08 strategic outlook Based Selection du Plan Strategique 50-CONS-PASE-2019 / Consultant Recrutement d'une Structure Component 3. Long term IDA / 58920 Post Qualification Open - International 500,000.00 0.00 Canceled 2019-03-29 2019-04-19 2019-06-02 2019-07-02 2019-08-06 2020-03-03 pour Accès de Senelec aux strategic outlook Selection Capitaux Privés- 06 mois 67-CONS-PASE-2019 / Component 4. Project Consultant Elaboration et Mise en Œuvre implementation, IDA / 58920 Post Qualification Open - National 150,000.00 109,110.30 Signed 2019-06-30 2019-07-09 2019-07-21 2019-09-03 2019-09-18 2019-10-03 2020-01-07 2019-11-07 2020-01-24 2020-09-02 Plan de Communication - Communication and Selection PASE 1 Monitoring and Evaluation 34BIS-CONS-PASE-2019 / Recrutement de Bureaux de Contrôle et Suivi Component 1: Upgrading and Consultant Environnemental et Social, de modernization of the IDA / 58920 Post Qualification Open - National 100,000.00 0.00 Canceled 2019-06-30 2019-10-24 2019-07-21 2019-09-03 2019-10-03 2019-11-07 2020-09-07 Remise en Etat et de Transmission and Selection Modernisation des Réseaux de Distribution Network Transport de Senelec, dans le cadre du PASE 2 - 12 mois 69-CONS-PASE-2019 / Sélection d’un Consultant Consultant pour un Accompagnement Component 3. Long term IDA / 58920 Post Qualification Open - International 300,000.00 0.00 Canceled 2019-07-15 2019-06-18 2019-08-05 2019-09-18 2019-10-18 2019-11-22 2020-04-05 dans la Mise en œuvre de la strategic outlook Selection Filialisation de Senelec – 04 mois 69BIS-CONS-PASE-2019 / Sélection d’un Consultant pour un Accompagnement Component 3. Long term Quality And Cost- IDA / 58920 Prior Open - International 1,000,000.00 0.00 Canceled 2019-08-15 2019-09-05 2019-10-19 2019-11-16 2019-12-16 2020-01-20 2020-02-24 2020-11-10 dans la Mise en œuvre de la strategic outlook Based Selection Filialisation de Senelec – 07 mois 72-CONS-PASE-2019 / Plan de Gestion Env. & Sociale pour Reprise Réseau 30kV partir Nouveau Poste Guédiaway, Component 4. Project Consultant Elab. et Mise en œuvre PAR implementation, IDA / 58920 Post Qualification Open - National 205,000.00 270,253.75 Signed 2019-11-30 2019-12-27 2019-12-21 2020-02-03 2020-03-14 2020-03-04 2020-03-03 2020-04-08 2020-07-16 2020-11-04 (optionnel): 120 Millions dont: Communication and Selection 20 Millions PGES- 01 mois; 50 Monitoring and Evaluation Millions PAR-1,5 mois, 50 Millions Mise en oeuvre PAR- 07 mois Page 7 77-CONS-PASE-2020 / RECRUTEMENT D’UN CONSULTANT SPECIALISE EN COMMUNICATION Component 4. Project EVENEMENTIEL POUR Consultant implementation, L’ORGANISATION DE LA TABLE IDA / 58920 Post Qualification Open - National 60,000.00 52,205.75 Signed 2020-02-06 2020-02-11 2020-02-27 2020-04-11 2020-07-23 2020-05-11 2020-08-19 2020-06-15 2020-09-18 2020-08-14 Communication and RONDE DES PARTENAIRES Selection Monitoring and Evaluation TECHNIQUES ET FINANCIERS POUR L’ACCES UNIVERSEL A L’ENERGIE pour 60 jours à partir de Fin mars 2020 78-CONS-PASE-2020 / Recrutement d’un Consultant AMOA pour un Accompagnement à Component 3. Long term Quality And Cost- l’Assistance à la Maîtrise IDA / 58920 Post Open - International 300,000.00 0.00 Canceled 2020-02-28 2020-03-12 2020-03-20 2020-03-13 2020-05-03 2020-05-31 2020-06-30 2020-08-04 2020-09-08 2021-01-06 strategic outlook Based Selection d’Ouvrage (AMOA) dans le cadre de l’Implémentation d’Oracle E-Business Suite R12 – Senelec - 04 mois 82-CONS-PASE-2020 / Component 4. Project Recrutement d’un Consultant Consultant implementation, pour La Capitalisation sur le IDA / 58920 Post Qualification Open - National 120,000.00 124,586.90 Completed 2020-07-14 2020-07-29 2020-08-04 2020-07-30 2020-09-17 2020-09-15 2020-10-17 2020-10-28 2020-11-21 2020-12-22 2021-02-19 2021-04-26 Communication and COVID 19 : Plan de Retour et Selection Monitoring and Evaluation Perspectives – 02 mois 78 BIS-CONS-PSE-2020 / Recrutement d’un Consultant pour un Accompagnement à l’Assistance à la Maîtrise Component 3. Long term Quality And Cost- IDA / 58920 Post Open - International 300,000.00 410,666.62 Signed 2020-07-20 2020-07-16 2020-08-10 2020-07-28 2020-09-23 2020-08-26 2020-10-21 2020-12-09 2020-11-20 2020-12-16 2020-12-25 2021-02-24 2021-01-29 2021-04-21 2021-06-28 d’Ouvrage (AMOA) dans le strategic outlook Based Selection cadre de l’Implémentation d’Oracle E-Business Suite R12 – Senelec – 04 mois 10-CONS-PASE-2017 / Assistance a la Component 3. Long term Quality And Cost- IDA / 58920 Post Open - International 667,000.00 0.00 Canceled 2017-06-30 2017-07-21 2017-09-13 2017-10-11 2017-11-10 2017-12-15 2018-01-19 2020-01-19 Restructuration Financiere de strategic outlook Based Selection SENELEC 79-CONS-PASE-2020 / RECRUTEMENT D’UN CONSULTANT POUR Consultant L’ASSISTANCE A LA Component 3. Long term IDA / 58920 Prior Qualification Open - International 300,000.00 0.00 Canceled 2020-03-13 2020-04-03 2020-05-17 2020-06-16 2020-07-21 2020-11-18 VALIDATION DES strategic outlook Selection IMMOBILISATIONS DE SENELEC AU ARRETES AU 30 JUIN 2020 - 04 mois 83-CONS-PASE-2020 / Recrutement d’Une Agence de Communication pour la Mise Component 4. Project en Place d’Une Stratégie Consultant implementation, Digitale, l’Accompagnement IDA / 58920 Post Qualification Open - National 30,700.00 95,280.64 Signed 2021-01-02 2020-12-17 2021-01-21 2021-03-06 2021-03-15 2021-04-05 2021-04-12 2023-04-05 2021-05-14 2023-10-02 Communication and Médiatique des Activités du Selection Monitoring and Evaluation PASE et la Conception de Supports de Communication pour une durée de 12 mois. 88-CONS-PASE-2021 / Recrutement d’un Consultant pour l’Elaboration d’un Plan Component 4. Project de Gestion de la Main d’œuvre Consultant implementation, Under et des Conditions de Travail IDA / 58920 Post Qualification Open - National 100,000.00 0.00 2021-06-18 2021-06-21 2021-07-09 2021-08-22 2021-09-21 2021-10-26 2022-01-24 Communication and Implementation du Projet d’Amélioration De Selection Monitoring and Evaluation l’Accès à l’Electricité au Sénégal (PADAES) - Durée : 60 jours 89-CONS-PASE-2021 / Recrutement d’un Consultant pour l’Elaboration d’un Plan Component 4. Project de Mobilisation des Parties Consultant implementation, Under Prenantes dans la mise en IDA / 58920 Post Qualification Open - National 150,000.00 0.00 2021-06-18 2021-06-21 2021-07-09 2021-08-22 2021-09-21 2021-10-26 2022-01-24 Communication and Implementation œuvre des activités du Projet Selection Monitoring and Evaluation d’Amélioration De l’Accès à l´Électricité au Sénégal (PADAES) - Durée : 60 jours 90-CONS-PASE-2021 / Recrutement d’un Consultant Component 4. Project pour le Suivi-Evaluation de la Consultant implementation, Pending Mise en Œuvre du PAR Hann – IDA / 58920 Post Qualification Open - National 144,000.00 0.00 2021-06-18 2021-07-09 2021-08-22 2021-09-21 2021-10-26 2022-01-24 Communication and Implementation Cap des Biches, prévu dans le Selection Monitoring and Evaluation Calendrier de Mise en œuvre du PAR - Durée : 03 mois INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02-CONS-PASE-2017 / Individual Assistance Technique pour Component 3. Long term IDA / 51450 Post Consultant Limited 10,000.00 0.00 Canceled 2017-05-31 2017-06-05 2017-06-26 2017-09-20 2018-09-20 Remplacement du Cable Sous strategic outlook Selection Marin Dakar -Gorée 03-CONS-PASE-2017 / Individual Recrutement d un Auditeur Component 3. Long term IDA / 51450 Post Consultant Limited 21,100.00 2,995.70 Signed 2017-05-31 2016-10-22 2017-06-05 2017-05-19 2017-06-26 2017-07-07 2017-07-31 2018-01-01 2019-07-31 Interne pour la periode 2016 strategic outlook Selection 2020 19-CONS-PASE-2017 / Etude Selection d un Consultant Individuel pour Realisation Audits Sociaux Projets de Individual Connexion Deux Centres Component 3. Long term IDA / 58920 Post Consultant Limited 61,250.00 16,004.10 Signed 2017-06-30 2017-01-21 2017-07-05 2018-01-02 2017-07-31 2018-01-05 2017-09-21 2018-01-05 2018-09-21 Secondaires IsolesTamba strategic outlook Selection Kaffrine Kougheul Koumpentoum et Matam Orefonde Ourossogui et du Renouvelement de la Li Page 8 04-CONS-PASE-2017 / Component 4. Project Recrutement 04 Ingenieurs Individual implementation, pour la Supervision des IDA / 51450 Prior Consultant Limited 96,410.00 0.00 Canceled 2017-06-30 2017-07-05 2017-07-31 2017-09-21 2018-09-21 Communication and Composantes 1 et 2 pour 01 Selection Monitoring and Evaluation an Renouvelable 27-CONS-PASE/2017 / Component 4. Project Individual Recrutement d Un Agent implementation, IDA / 58920 Post Consultant Open 35,000.00 0.00 Canceled 2017-08-15 2017-10-03 2017-10-24 2017-11-28 2020-11-27 Archiviste et Suivi Communication and Selection Documentaire pour le PASE Monitoring and Evaluation 28-CONS-PASE/2017 / Component 4. Project Individual Recrutement d Un Assistant implementation, Pending IDA / 58920 Post Consultant Open 43,000.00 0.00 2017-06-30 2017-08-18 2017-09-08 2017-10-13 2020-10-12 Suivi Evaluation et Indicateur Communication and Implementation Selection de Performance Monitoring and Evaluation 29-CONS-PASE/2017 / Component 4. Project Individual Recrutement d Un Assistant implementation, IDA / 58920 Post Consultant Open 43,000.00 2,079.64 Signed 2017-06-30 2017-03-21 2017-08-18 2017-07-12 2017-09-08 2017-07-18 2017-10-13 2017-11-01 2020-10-12 en Suivi Evaluation Communication and Selection Environnementale et Sociale Monitoring and Evaluation 30-CONS-PASE/2017 / Component 4. Project Individual Recrutement d Un Assistant implementation, IDA / 58920 Post Consultant Open 43,000.00 1,803.25 Signed 2017-08-15 2017-03-21 2017-10-03 2017-07-04 2017-10-24 2017-08-01 2017-12-15 2017-11-01 2020-12-14 en Suivi Evaluation Impacts Communication and Selection Socio Economique Monitoring and Evaluation 32-CONS-PASE-2017 / Component 4. Project Individual Recrutement d Un Agent implementation, IDA / 58920 Post Consultant Open 35,000.00 0.00 Canceled 2017-10-15 2017-12-03 2017-12-24 2018-01-28 2020-12-03 Logistique et Suivi Contrat Communication and Selection pour le PASE Monitoring and Evaluation 33-CONS-PASE-2017 / Component 4. Project Individual REcrutement d Un Chargé de implementation, IDA / 58920 Post Consultant Open 46,000.00 2,109.55 Signed 2017-10-15 2018-12-03 2017-12-03 2019-07-25 2017-12-24 2019-08-05 2018-01-28 2020-01-02 2020-12-03 la Communication pour le Communication and Selection PASE Monitoring and Evaluation 36-CONS-PASE-2017 / Component 4. Project Recrutement Consultant implementation, Individuel Suivi Evaluation (12 IDA / 58920 Prior Direct Selection Direct 36,000.00 0.00 Canceled 2018-01-09 2020-10-08 2018-01-19 2018-03-25 2019-03-25 Communication and mois): Du 01 01 au 31 12 Monitoring and Evaluation 2018 39-CONS-PASE-2018 / Etude Additionnelle à l'Etude Component 3. Long term d'Intégration des Energies IDA / 58920 Post Direct Selection Direct 100,000.00 99,640.00 Signed 2018-03-30 2018-03-06 2018-04-09 2018-03-08 2018-06-13 2019-06-14 2018-12-10 strategic outlook Renouvelables: Proposé en Entente Directe avec WSP 40-CONS-PASE-2018 / Component 1: Upgrading and Recrutement d'un Expert en Individual modernization of the Réinstallation pour le Tronçon IDA / 58920 Post Consultant Limited 25,000.00 21,192.38 Signed 2018-08-16 2018-07-04 2018-08-21 2018-07-04 2018-09-27 2018-07-18 2018-11-01 2018-10-20 2019-04-30 Transmission and : Poste Mbao - Cap des Biches Selection Distribution Network : 05 mois 41-CONS-PASE-2018 / Recrutement d'un Expert en Component 1: Upgrading and Individual Communication et modernization of the IDA / 58920 Post Consultant Limited 25,000.00 21,211.38 Signed 2018-08-17 2018-07-04 2018-08-22 2018-07-04 2018-09-28 2018-07-17 2018-11-11 2018-10-20 2019-05-10 Accompagnement Sociale Transmission and Selection pour le Tronçon Poste Mbao - Distribution Network Cap des Biches: 05 mois 42-CONS-PASE-2018 / Recrutement d'un Expert en Analyse Environnementale Initiale du Projet de Component 1: Upgrading and Individual Sécurisation Alimentation modernization of the IDA / 58920 Post Consultant Limited 50,000.00 42,643.75 Completed 2018-08-16 2018-08-14 2018-08-21 2018-02-27 2018-09-11 2018-09-10 2018-10-25 2018-09-10 2019-02-02 2019-11-26 Electrique de KARMEL et Transmission and Selection Amélioration de la Qualité de Distribution Network Service des Feeders T32 - T31 - Rufisque Nord et Km 22 pour 02 mois 43-CONS-PASE-2018 / Component 1: Upgrading and Individual Recrutement d'un Expert pour modernization of the Pending IDA / 58920 Post Consultant Limited 30,000.00 0.00 2018-08-22 2018-08-27 2018-09-17 2018-10-22 2018-12-21 actualisation PGES des Lots 1 Transmission and Implementation Selection et 2 du P1A : 01 mois Distribution Network 11-CONS-PASE-2018 / Mise en œuvre Etude Tarifaire : Individual Component 3. Long term Elaboration Grille Tarifaire IDA / 58920 Post Consultant Open 100,000.00 352,323.57 Signed 2018-07-27 2019-08-08 2018-09-14 2019-01-10 2018-10-05 2019-04-15 2018-11-18 2019-10-30 2019-06-06 strategic outlook Intégrant les Tarifs Selection Spécifiques 24-CONS-PASE/2017 / Component 4. Project Individual Recrutement d Un Second implementation, IDA / 58920 Prior Consultant Open 40,850.00 0.00 Canceled 2017-07-30 2018-10-19 2018-11-09 2019-01-16 2020-01-16 Specialiste en Passation des Communication and Selection Marches pour le PASE Monitoring and Evaluation 46-CONS-PASE-2018 / Recrutement d'un Consultant Individuel pour Elaboration Component 4. Project Individual PGES du Lot 3 - P1A : Création implementation, IDA / 58920 Post Consultant Limited 40,000.00 35,776.02 Signed 2018-11-30 2018-09-17 2018-12-05 2018-12-10 2018-12-26 2019-04-01 2019-01-30 2019-06-12 2019-04-30 de Postes et de Secteurs, Communication and Selection Extension et Renforcement de Monitoring and Evaluation Réseaux BT à Dakar et dans les Régions - 02 mois 31-CONS-PASE-2017 / Component 4. Project Recrutement d' un Second Individual implementation, Comptable Projet Autres IDA / 58920 Post Consultant Open 37,000.00 0.00 Canceled 2019-01-31 2019-04-03 2019-04-24 2020-02-29 2021-02-28 Communication and Bailleurs: Proposition de voir Selection Monitoring and Evaluation la solution avec Fatou 25-CONS-PASE/2017 / Recrutement d'un Acheteur Component 4. Project pour le PASE: Comme le Individual implementation, processus de Recrutement du IDA / 58920 Post Consultant Open 62,000.00 0.00 Canceled 2018-11-19 2019-02-01 2019-02-22 2019-04-11 2020-04-10 Communication and Second SPM est très avancé, je Selection Monitoring and Evaluation propose de le finaliser en même temps Page 9 06-CONS-PASE-2017 / Seconde Mise a jour du Component 4. Project Individual Manuel Exécution du PASE1 implementation, Pending IDA / 51450 Post Consultant Direct 17,015.00 0.00 2017-05-31 2019-02-28 2019-03-21 2019-04-25 2019-10-22 afin d'intégrant les Procédures Communication and Implementation Selection relatives aux nouveaux Monitoring and Evaluation Bailleurs pour PASE 2 Component 4. Project 26-CONS-PASE/2017 / Individual implementation, Recrutement d Un Assistant IDA / 58920 Post Consultant Open 31,000.00 0.00 Canceled 2017-07-30 2017-09-17 2017-10-08 2017-11-12 2020-11-11 Communication and en Passation des Marches Selection Monitoring and Evaluation 35-CONS-PASE-2017 / Recrutement d'Un Consultant Component 3. Long term Pour Déploiement du Système IDA / 58920 Prior Direct Selection Direct 269,533.00 0.00 Canceled 2018-01-30 2018-06-19 2018-02-28 2018-07-01 2019-08-05 strategic outlook d'Information Energétique (SIG) au Sénégal 37-CONS-PASE-2018 / Etude Complémentaire à l'Inventaire Component 3. Long term IDA / 58920 Prior Direct Selection Direct 210,000.00 0.00 Canceled 2018-10-15 2018-10-25 2018-12-29 2019-06-27 et la Réévaluation des strategic outlook Immobilisation de Senelec 48-CONS-PASE-2019 / Recrutement d'un Consultant Individual Component 3. Long term Individuel pour un IDA / 58920 Post Consultant Limited 100,000.00 0.00 Canceled 2019-01-15 2019-01-20 2019-02-10 2019-03-17 2019-06-15 strategic outlook Accompagnement sur le Gas Selection To Power - 02 mois 55-CONS-PASE-2019 / Recrutement d'un Consultant pour une Formation sur la Component 4. Project GESTION FINANCIERE - Individual implementation, MOBILISATION ET IDA / 58920 Post Consultant Limited 3,000.00 3,274.62 Signed 2019-03-31 2019-05-29 2019-04-05 2019-05-02 2019-04-26 2019-07-24 2019-05-31 2020-01-09 2019-06-30 Communication and DECAISSEMENT DES Selection Monitoring and Evaluation RESSOURCES DES PROJETS FINANCES PAR LA BANQUE MONDIALE 57-CONS-PASE-2019 / Recrutement d'un Formation sur le Management de la Production d'Electricité avec Component 4. Project Combustible Gaz et Aspects Individual implementation, Géopolitiques, Techniques, IDA / 58920 Post Consultant Open 20,000.00 0.00 Canceled 2019-06-16 2019-08-04 2019-08-25 2019-09-29 2021-05-21 Communication and Economiques, Financiers et Selection Monitoring and Evaluation Juridiques : En 02 Sessions de 02 à 03 jours en Hôtel (1ère Session: Comdir Elargi : 23 part 58-CONS-PASE-2019 / Recrutement d'Un Formanteur sur les contrats Gaziers : Réglementation, types, Component 4. Project clauses particulières et Individual implementation, standards : En 01 Sessions de IDA / 58920 Post Consultant Open 20,000.00 0.00 Canceled 2019-06-25 2019-08-13 2019-09-03 2019-10-08 2019-11-07 Communication and 02 à 03 jours en Hôtel - Selection Monitoring and Evaluation Directeurs, Chefs de Département, Chefs de Service, Chefs de Projets, Experts : environ 29 partic 61-CONS-PASE-2019 / Recrutement d'un CI pour la Component 4. Project Individual Formation sur les Aspects implementation, Under IDA / 58920 Post Consultant Limited 4,000.00 0.00 2019-06-30 2019-05-15 2019-07-05 2019-11-13 2019-07-26 2019-08-30 2019-09-29 Hygiène - Sécurité- Communication and Implementation Selection Environnement (HSE) - 02 Monitoring and Evaluation jours (Frais Hôtel Compris) 62-CONS-PASE-2019 / Recrutement d'un CI pour la Component 4. Project Individual Formation sur les Etudes implementation, IDA / 58920 Post Consultant Limited 4,000.00 5,060.65 Signed 2019-06-30 2019-05-15 2019-07-05 2019-06-01 2019-07-26 2020-02-12 2019-08-30 2020-03-16 2019-09-29 Environnementales & Sociales Communication and Selection (EIES) - 02 jours (Frais Hôtel Monitoring and Evaluation Compris) 63-CONS-PASE-2019 / Recrutement de 02 Ingénieurs Component 4. Project en Génie Civil pour le Contrôle Individual implementation, Pending et le Suivi des Travaux (1 005 IDA / 58920 Post Consultant Limited 48,282.00 0.00 2019-06-30 2019-07-05 2019-07-26 2019-08-30 2020-08-29 Communication and Implementation 864 x 2 x 12 = 24 140 740 F Selection Monitoring and Evaluation CFA): Bien Prévu pour 02 CI sur 12 mois 64-CONS-PASE-2019 / Recrutement de 02 Ingénieurs Component 4. Project en Génie Electrique pour le Individual implementation, Contrôle et le Suivi des IDA / 58920 Post Consultant Limited 48,282.00 0.00 Canceled 2019-06-30 2019-07-05 2019-07-26 2019-08-30 2020-08-29 Communication and Travaux (1 005 864 x 2 x 12 Selection Monitoring and Evaluation = 24 140 740 F CFA): Bien Prévu pour 02 CI sur 12 mois 65-CONS-PASE-2019 / Recrutement de 03 Techniciens Supérieurs en Component 4. Project Individual Génie Civil pour le Contrôle et implementation, Pending IDA / 58920 Post Consultant Limited 54,000.00 0.00 2019-06-30 2019-07-05 2019-07-26 2019-08-30 2020-08-29 le Suivi des Travaux (746 550 Communication and Implementation Selection x 3 x12= 26 876 000 F CFA): Monitoring and Evaluation Bien Prévu pour 03 CI sur 12 mois 66-CONS-PASE-2019 / Recrutement de 03 Techniciens Supérieurs en Component 4. Project Individual Génie Electrique pour le implementation, IDA / 58920 Post Consultant Limited 54,000.00 0.00 Canceled 2019-06-30 2019-07-05 2019-07-26 2019-08-30 2020-08-29 Contrôle et le Suivi des Communication and Selection Travaux (746 550 x 3 x12 = Monitoring and Evaluation 26 876 000 F CFA): Bien Prévu pour 03 CI sur 12 mois 60-CONS-PASE-2019 / Recrutement d'un CI pour Component 4. Project Individual l'Étude et la Conception du implementation, IDA / 58920 Post Consultant Open 80,000.00 67,251.20 Signed 2019-05-30 2019-07-24 2019-07-18 2019-11-08 2019-08-08 2020-02-12 2019-09-12 2020-03-16 2020-01-10 Schéma d'Aménagement des Communication and Selection Emprises de la Ligne Hann- Monitoring and Evaluation CDB - 02 mois Page 10 68-CONS-PASE-2019 / Recrutement de 02 CI pour l’UEP : Ingénieur Component 1: Upgrading and Individual Electromécanicien ou modernization of the IDA / 58920 Post Consultant Open 73,000.00 0.00 Canceled 2019-08-15 2019-10-03 2019-10-24 2019-11-28 2020-11-27 Electricien pour le Suivi des Transmission and Selection Projets de Transport et de Distribution Network Distribution - 01 an renouvelable 70-CONS-PASE-2019 / Sélection d’un Consultant pour un Accompagnement Component 3. Long term IDA / 58920 Prior Direct Selection Direct 300,000.00 0.00 Canceled 2019-08-22 2019-09-01 2019-11-05 2020-03-04 dans la Mise en œuvre de la strategic outlook Filialisation de Senelec – 03 mois 21 jours 24-CONS-PASE-2019 / Component 4. Project Individual Recrutement d'un Second implementation, IDA / 58920 Post Consultant Open 40,850.00 29,781.23 Signed 2019-11-15 2019-10-03 2020-01-03 2020-05-12 2020-01-24 2020-09-29 2020-02-28 2020-09-29 2020-10-25 Spécialiste en Passation des Communication and Selection Marchés - PASE Monitoring and Evaluation 70 BIS-CONS-PASE-2019 / Sélection d’un Consultant pour un Accompagnement Component 3. Long term IDA / 58920 Post Direct Selection Direct 500,000.00 555,822.01 Signed 2019-11-15 2019-12-27 2019-11-25 2019-08-01 2020-01-29 2020-08-27 2020-07-27 dans la Mise en œuvre de la strategic outlook Filialisation de Senelec – 15 Semaines (03 mois 21 jours) 74-CONS-PASE-2020 / Component 4. Project Recrutement d’un Expert Individual implementation, Chargé du Suivi des Projets IDA / 58920 Post Consultant Limited 24,000.00 0.00 Canceled 2019-12-24 2020-01-14 2019-12-29 2020-01-19 2020-02-23 2021-02-22 Communication and FSRU et Gas-To Power – 07 Selection Monitoring and Evaluation mois pour SPE 75-CONS-PASE-2020 / Component 4. Project Recrutement d’un Expert Individual implementation, Chargé du Suivi des Projets IDA / 58920 Post Consultant Limited 24,000.00 0.00 Canceled 2020-01-07 2020-01-14 2020-01-12 2020-02-02 2020-03-08 2020-10-04 Communication and d’Infrastructures Gazières – Selection Monitoring and Evaluation 07 mois pour SPE 76-CONS-PASE-2020 / Component 4. Project Recrutement d’un Expert Individual implementation, Chargé du Suivi IDA / 58920 Post Consultant Limited 19,000.00 2,147.34 Signed 2020-01-07 2020-03-06 2020-01-12 2020-03-09 2020-02-02 2020-05-11 2020-03-08 2020-09-29 2020-10-04 Communication and Environnemental et Social – 07 Selection Monitoring and Evaluation mois pour SPE 73-CONS-PASE-2020 / RECRUTEMENT D’UN CONSULTANT POUR « L’ACCOMPAGNEMENT DU COMITE DE REDACTION DU Component 3. Long term IDA / 58920 Post Direct Selection Direct 53,000.00 47,524.64 Signed 2020-01-31 2020-01-17 2020-02-10 2019-10-28 2020-04-15 2020-09-07 2020-05-30 CONTRAT DE PERFORMANCE strategic outlook ETAT DU SENEGAL - SENELE C2020/2022 » - 06 Semaines avec le Groupement ERUDIT - FCG 80-CONS-PASE-2020 / Recrutement d’Un Consultant Component 4. Project Individual Individuel pour la Formation implementation, IDA / 58920 Post Consultant Limited 10,000.00 3,075.73 Signed 2020-02-20 2020-02-10 2020-02-25 2020-02-20 2020-03-17 2020-07-09 2020-04-21 2020-09-07 2020-04-24 en GENRE – UEP & Senelec – Communication and Selection DQSE – SF – Bureau ce Monitoring and Evaluation Contrôle et Suivi Travaux 81-CONS-PASE-2020 / Component 4. Project Individual Recrutement d’un Spécialiste implementation, IDA / 58920 Post Consultant Open 30,000.00 2,109.55 Signed 2020-02-26 2018-12-03 2020-04-15 2019-08-01 2020-05-06 2019-11-01 2020-06-10 2019-11-01 2020-10-28 Chargé du Genre au PASE - Communication and Selection 12 mois Monitoring and Evaluation 38-CONS-PASE-2018 / Recrutement d'un Consultant Individual Component 3. Long term Individuel Sénior Permanant IDA / 58920 Post Consultant Limited 100,000.00 0.00 Canceled 2018-03-30 2018-04-04 2018-04-25 2018-05-30 2018-11-26 strategic outlook en Energie Renouvelable pour Selection 1 an (renouvelable) 59-CONS-PASE-2019 / Recrutement d'un CI pour Component 4. Project Individual l'Évaluation Financière de la implementation, IDA / 58920 Post Consultant Open 100,000.00 0.00 Canceled 2019-06-30 2019-11-01 2019-08-18 2019-09-08 2019-10-13 2020-01-11 Sécurisation Juridique des Communication and Selection Emprises de la Ligne Hann- Monitoring and Evaluation CDB - 02 mois 23-CONS-PASE/2017 / Component 4. Project Recrutement Consultant implementation, IDA / 58920 Prior Direct Selection Direct 36,000.00 0.00 Canceled 2017-06-29 2017-07-09 2018-07-12 2019-01-08 Individuel Suivi Evaluation Communication and Opérationnel depuis Janvier Monitoring and Evaluation 01-CONS-PASE-2013 / Component 4. Project Individual RECRUTEMENT RESPONSABLE implementation, IDA / 58920 Post Consultant Open 42,500.00 3,059.96 Signed 2020-10-23 2012-10-02 2020-12-11 2013-02-15 2021-01-01 2013-06-11 2021-02-05 2013-06-11 2022-02-05 DE LA PASSATION DE Communication and Selection MARCHES Monitoring and Evaluation 36 BIS-CONS-PASE-2017 / Component 4. Project Recrutement Consultant implementation, IDA / 58920 Post Direct Selection Direct 36,000.00 3,188.80 Signed 2020-10-20 2016-09-24 2020-10-30 2016-09-24 2021-01-03 2018-01-01 2022-01-03 Individuel Suivi Evaluation (12 Communication and mois) Monitoring and Evaluation 84-CONS-PASE-2021 / Recrutement d’un Consultant pour le Diagnostic des Component 4. Project Activités Genre en Amont du Individual implementation, Under Reboisement Compensatoire IDA / 58920 Post Consultant Limited 25,000.00 0.00 2021-02-15 2021-03-24 2021-02-20 2021-04-08 2021-03-13 2021-04-17 2021-05-17 Communication and Implementation sur les Axes d : Djiredji – Selection Monitoring and Evaluation Bemet et Bonkonto – Médina Gounass et de Celles de la Commune de Sédhiou 85-CONS-PASE-2021 / Component 4. Project Recrutement d’un Consultant Individual implementation, Under pour une Formation en EES IDA / 58920 Post Consultant Limited 5,600.00 0.00 2021-02-15 2021-03-24 2021-02-20 2021-03-13 2021-04-17 2021-04-22 Communication and Implementation pour une Synergie Genre& Selection Monitoring and Evaluation Environnement Page 11 86-CONS-PASE-2021 / Recrutement d’un Consultant pour une ETUDE SUPPLÉMENTAIRE SUR LES Component 4. Project ESPÈCES EN DANGER CRITIQUE implementation, IDA / 58920 Post Direct Selection Direct 15,000.00 12,126.57 Signed 2021-03-30 2021-03-31 2021-04-09 2021-02-22 2021-06-03 2021-06-14 2021-11-30 D'EXTINCTION - PAN Communication and TROGLODYTES VERUS - Monitoring and Evaluation CHIMPANZÉS D'AFRIQUE DE L'OUEST – WEST AFRICAN CHIMPANZEE 87-CONS-PASE-2021 / Recrutement d’un Consultant pour « L’AUDIT DU CONTRAT Component 3. Long term Under IDA / 58920 Post Direct Selection Direct 187,000.00 0.00 2021-06-10 2021-06-02 2021-06-20 2021-08-24 2021-12-07 DE PERFORMANCE Etat du strategic outlook Implementation Sénégal - Senelec au titre de l’Année 2020 91-CONS-PASE-2021 / Recrutement d’un Consultant Individuel pour l’Elaboration d’un Cadre de Gestion Component 4. Project Environnementale et Sociale Individual implementation, Pending (CGES) et d’un Cadre de IDA / 58920 Post Consultant Open 100,000.00 0.00 2021-07-15 2021-09-02 2021-09-23 2021-10-28 2022-01-26 Communication and Implementation Politique de Réinstallation Selection Monitoring and Evaluation (CPR) du Projet d’Amélioration De l’Accès à l´Électricité au Sénégal (PADAES) - Durée : 02 mois Page 12 PROCUREMENT PLAN (Project Preparation Advance- PPA) I. General Project information: Ghana, Africa Environment Health And Pollution Management Program (P167788) Project Implementation agency: Environmental Protection Agency (EPA) Date of the Procurement Plan: June , 2020 Period covered by this Procurement Plan: September 2020 to March 2022 (PPA Period) Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: When approaching the national market (as specified in the Procurement Plan tables in STEP), Bank’s Procurement Regulations will be followed. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None Recommendations from the Procurement Assessment of EPA (Finalized in March 2019) As part of the preparation of the Project Preparation Advance (PPA), the following recommendations were made as a result of the procurement assessment of EPA, carried out by the World Bank: a. The EPA to provide adequate incentives to attract and maintain the existing procurement staff and to ensure effective coordination of procurement activities by the multiple implementing agencies. b. The World Bank to organize and deliver training session for the procurement staff on the Procurement Framework during the appraisal and immediately after, for effectiveness, with hands-on support to ensure proper and effective application of the Bank’s regulations. c. Intensify training in Procurement and Contract Management by the Bank. d. Supplement the efforts of the procurement staff by hiring a procurement consultant to support them, if the need arises. e. Use World Bank standard procurement documents found on the website- www.worldbank.org/procurement for all procurements with the appropriate modification acceptable by the World Bank; f. Prepare a simple Procurement Manual (or a part of a Public Investment Management- PIM) in line with the World Bank Procurement Regulation to guide procurement implementation. g. The Procurement staff should attend the World Bank monthly procurement clinic, while building the capacity of the entire organization on World Bank procurement procedures. II. Goods and Works and non-consulting services. Thresholds for Prior Review, Procurement Approaches and Methods – Goods, Works, Non- Consulting Services and Consulting Services Procurement Method and Prior Review Thresholds Thresholds Effective1January2017 Prior ReviewThreshold in (US$'000) ProcurementMethods Thresholds (inUS$'000) Shortlist of Nationa l Consultants Works Goods, ITand non-consulting services Consulta nts Single Engine e ring Goods, IT Source& Reque st for Reque st for Ope n O pen Ope n O pen & Systems+ Direct Q uota tion/ Q uota tion/ Consulting RISK RATING Works Firms Individuals Inte rna tiona National or Inte rna tiona National or constructio Non Con. Contract N ationa l Nationa l services l or ICB N CB l or ICB N CB n Serv Shopping Shopping supe rvision HIGH ≥$5,000 ≥$1,500 ≥$500 ≥$200 ≥$100 ≥15000 <15000 ≤200 ≥3000 <3000 ≤100 <300 ≤500 Post Review: All contracts not subject to prior review shall be subject to post review. Procurement Method and Prior Review Thresholds a. Summary of the procurement packages for Good, Works and Non-Consulting Services Sr. Contract Estimat Revi Market Selecti Evaluation Procurem Prequ Domesti Expecte Expecte No Description ed Cost ew Approa on Options ent alifica c d date d date of (US$) by ch Metho (Most Process tion Prefere of bid/ Contract Bank (Open- d Advantage (Single (Yes/ nce proposa Signatur (Prio Nationa (RFP, ous Bid, stage- No) (Yes/No l e r/ l/ RFB, BAFO, single ) opening Post) Limited RFQ, Rated envelope etc.) DS Criteria etc.) etc.) etc.) WORKS 1 Establishment of Post Open- RFB Least Cost, Single Yes No 24/06/20 28/08/202 Up-to Five (5) National Rated stage- 21 1 Clean Mining Criteria single Demonstration envelope Centers in the Middle Sector of 1,000,00 Ghana 0 Build and Post Open- RFB Least Cost, Single Yes No 20/07/20 29/09/202 Establish at least National Rated Stage- 21 1 1 and up-to 2 Criteria Single National Buy- Envelope back/Holding 1,000,00 Centers for E- 0 waste Build and Post Open- RFB Least Cost, Single Yes No 20/07/20 23/09/202 Establish E-waste National Rated Stage- 21 1 Collection and Criteria Single Dismantling Envelope Centers in at least 5 to 10 Selected E-waste 900,000 Hotspots Outside Accra Establishment of Post Open- RFB Least Cost, Single Yes No 24/06/20 28/08/202 (up to) 5 Clean National Rated Stage- 21 1 Mining Criteria Single Demonstration Envelope Centers in the Northern and Southern Sectors 1,000,00 of Ghana 0 Total Works 3,900,0 00 GOODS Supply of 2No. Post Open- RFB Least Cost, Single No No 03/11/20 07/01/202 Cross Country National Rated Stage- 20 1 (4x4) SUV 200,000 Criteria Single Station Wagon Envelope Supply of Office Post Open- RFQ Least Cost, Single No No 26/09/20 07/11/202 Equipment and National Rated Stage- 20 0 Furniture Criteria Single (2 Sets of Envelop Desktop Computers with UPS devices; 10 sets of Laptop Computers; 2 MFP Printers; 4 Sets of Office desk and swivel Chair; 1 LCD Projector with 60,000 mobile screen; Pull-ups screens; Office Stationery Total Goods 260,000 b. Threshold Prior Review, Selection Approaches and Methods – Consulting Services - Refer to threshold table above. Note: Consultancy services estimated to cost equivalent to US $ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or regional newspaper. Summary of the procurement packages for Consulting Services: Sr. Contract Description Estimat Revie Market Selection Shortlist Expected Expected No ed Cost w by Approach Method ing date of date of (US$) Bank (Open - (QCBS, (Yes/ No) bid/ Contract (Prior/ Internation FBS, LCBS, proposal Signature Post) al/ QBS, CQS, opening National/ DS etc.) etc.) 1 Project Communication and Open 35,000 Prior INDV No 29/10/2020 24/12/2020 Reporting Specialist National 2 Open 40,000 Prior INDV No Recruiting Procurement National 20/10/2020 15/12/2020 Specialist 3 Design and supervision of (at least) 1 and, up-to 2 National Open 200,000 Prior FIRM/QCBS No 08/05/2021 Buy-Back & Holding Centers for National 16/01/2021 E-waste 4 Consultancy Service for the Open Compilation of a National E- 200,000 Prior FIRM/CQS No 16/01/2021 26/04/2021 International waste Inventory (NEI) for Ghana 5 Consultancy Service for the Preparation of Technology Open 450,000 Prior FIRM/QCBS No 21/01/2021 01/05/2021 Roadmaps on Artisanal Small International Scale Mining (ASGM) in Ghana 6 Design and Supervision of the Construction of (up to) Ten (10) Open Clean Mining Demonstration 200,000 Prior FIRM/QCBS No 28/01/2021 08/5/2021 National Centers in the Northern, Middle and Southern Sectors of Ghana 7 Consultancy Service to Assess National Institutional Policies and Legislative Gaps in Mercury Open Management and Develop 150,000 Post FIRM/CQS No 01/12/2020 20/03/2021 International Consolidated Legal Framework to Meet all Requirements of the Minamata Convention in Ghana Consultancy Service for the Preparation of Outreach and Open 120,000 Post Firm/CQS No 10/11/2020 27/02/2021 Communication Strategy on National Mercury Management in Ghana Training of Environmental Protection Agency (EPA) and MESTI staff as well as officers Open from the Customs Division of 80,000 Post Firm/CQS No 01/12/2020 20/03/2021 National the Ghana Revenue Authority (GRA) on E-waste Management and E-waste Fund Consultancy Service to Conduct Open an Economic Assessment of 100,000 Post Firm/CQS No 03/12/2020 22/03/2021 International Plastics in E-waste in Ghana Consultancy Service for the Development Interim Standards Open for Mercury Management Along 150,000 Post Firm/CQS No 16/11/2020 05/03/2021 National the Mercury Value-Chain in Ghana Technical Assistance to E-waste Associations/Co-operatives on Open 100,000 Post Firm/CQS No 03/12/2020 22/03/2021 Safe Handling and Recycling of National E-waste and Development Consulting Services for the Compilation of a National Open 150,000 Post Firm/CQS No 04/11/2020 21/02/2021 Mercury Inventory (NMI) for International Ghana Consulting Service to Assess Open the Economics of the Eco-Levy 100,000 Post Firm/CQS No 10/11/2020 27/02/2021 National in Ghana Awareness Raising on Health Impacts of Mercury Open 80,000 Post Firm/CQS No 27/10/2020 13/02/2021 Management and Solutions in National Mining Communities Production of a Standard Design and Supervision for the Construction of Collection and Open 200,000 Post Firm/CQS No 05/11/2020 22/02/2021 Dismantling Centers in at least National 5 to 10 E-waste Hotspots Outside Accra Technical Assistance to Interested Private Operators Open and Scrap Dealers in the E- 100,000 Post Firm/CQS No 17/11/2020 06/03/2021 National waste Industry on Bidding and Operating Centers in Ghana Consultancy Service for the Open 200,000 Post Firm/CQS No 14/12/2020 02/04/2021 Development of International Implementation Plan for the E- waste Policy of Ghana Consulting Service for the Assessment of Access to Finance for Artisanal and Small Open 100,000 Post Firm/CQS No 02/12/2020 21/03/2021 Scale Miners (ASGM) and National Preparation of Financial Roadmaps for ASGM Media Training on Health Risks and Positive Development and Open 80,000 Post Firm/CQS No 10/11/2020 27/02/2021 Successful Pilots in Addressing National Mercury Management in ASGM Outreach to Local Governments and Non-Governmental Open Organizations and Consultants 80,000 Post Firm/CQS No 24/11/2020 13/03/2021 National in Charge of Investment in ASGM Updating of University of Mines and Technology Courses to Limited 60,000 Post Firm/CQS No 12/11/2020 16/01/2021 include New Innovations and National Technologies in Mining Total Consultancy Services 2,975,0 00 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) Above US$ 1,500,000 All 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million All 5. Consultancy Services (Firms) Above US$ 500,000 All 6. Consultancy Services Above US$ 200,000 All (Individual) 2. Prequalification. Bidders for Works shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by Not Yet 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] - Not Applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comments No. on ed stic by Bank Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 1.25 6 No Prior 2 Contracts for of the IC Prior Review (Consultan cy) and 4 for Post Summary 1.725 16 No Post 6 Contracts for of the NC Prior Review (Consultan and 10 for Post cy) Summary 3.9 4 No Post of the NCB (Works) Summary 0.2 1 No Post of the NCB (Goods) Summary 0.06 1 No Post of the RFQ (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignment Cost (Prior / US$ Post) million Summary of 0.85 3 Prior number of contracts that will be let under QCBS Summary of 2.05 17 Post CQS (1 number of Prior contracts Review) that will be let under other methods Summary of 0.75 2 Prior number of contracts that will be let under INDIVIDUAL PROCUREMENT Western Africa : Africa Environmental Health and Pollution Management Program PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2020-06-16 2021-06-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167788 GPN Date: 2021-02-10 Project Name: Africa Environmental Health and Pollution Management Program Loan / Credit No: / , TF / B3246, TF / B3321 A Executing Agency(ies): frica Environmental Health and Pollution Management Program - GHANA WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GH-EHPMP-171044-CW-RFB / Establishment of (up to) 5 Demonstrating Application of Pending Single Stage - One 2023-11- Clean Mining Demonstration TF / B3321 Technological Tools and Post Request for Bids Open - National 1,000,489.26 0.00 Implementat 2021-11-02 2022-01-18 2022-01-18 2021-11-07 2022-03-29 2022-04-28 2022-06-02 Envelope 24 Centers in the Northern and Economic Approaches ion Southern Sectors of Ghana GH-EHPMP-171045-CW-RFB / Establishment of Up-to Five Demonstrating Application of Pending Single Stage - One 2023-08- (5) Clean Mining TF / B3321 Technological Tools and Post Request for Bids Open - National 1,000,519.47 0.00 Implementat 2021-12-07 2022-02-22 2022-02-22 2021-12-12 2022-05-03 2022-06-02 2022-07-07 Envelope 01 Demonstration Centers in the Economic Approaches ion Middle Sector of Ghana GH-EHPMP-171046-CW-RFB / Build and Establish E-waste Demonstrating Application of Pending Collection and Dismantling Single Stage - One 2023-11- TF / B3321 Technological Tools and Post Request for Bids Open - National 900,015.53 0.00 Implementat 2021-10-26 2022-01-11 2022-01-11 2021-10-31 2022-03-22 2022-04-21 2022-05-26 Centers in at least 5 to 10 Envelope 17 Economic Approaches ion Selected E-waste Hotspots Outside Accra GH-EHPMP-171047-CW-RFB / Build and Establish at least 1 Demonstrating Application of Pending Single Stage - One 2023-07- and up-to 2 National Buy- TF / B3321 Technological Tools and Post Request for Bids Open - National 998,702.96 0.00 Implementat 2021-12-07 2022-02-22 2022-02-22 2021-12-12 2022-05-03 2022-06-02 2022-07-07 Envelope 07 back/Holding Centers for E- Economic Approaches ion waste GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-EHPMP-171048-GO-RFQ / Supply of Office Equipment and Furniture (2 Sets of Desktop Computers with UPS devices; 10 sets of Under Program Implementation and Request for Single Stage - One Laptop Computers; 2 MFP TF / B3321 Post Open - National 60,000.00 0.00 Implementati 2021-03-20 2021-05-20 2021-06-03 Coordination Quotations Envelope Printers; 4 Sets of Office desk on and swivel Chair; 1 LCD Projector with mobile screen; Pull-ups screens; Office Stationery GH-EHPMP-171049-GO-RFB / Supply of 2No. Cross Institutional Strengthening, Single Stage - One Country (4x4) SUV Station TF / B3321 Knowledge and Capacity Post Request for Bids Open - National 200,000.00 0.00 Canceled 2021-03-23 2021-04-07 2021-03-28 2021-05-09 2021-05-05 2021-06-08 2021-05-21 2021-07-13 2021-09-11 Envelope Wagon and 1No. Pick-Up Building vehicles GH-EHPMP-234079-GO-RFQ / Supply and installation of 8No. laptop and 2No. Desktop Under Program Implementation and Request for Single Stage - One Computers, LCD Projector, TF / B3321 Post Limited 38,000.00 0.00 Implementati 2021-05-22 2021-05-14 2021-07-10 2021-07-24 Coordination Quotations Envelope 4No. Printers and other on computers accessories/IT equipment GH-EHPMP-234189-GO-RFQ / Supply and installation of Under Program Implementation and Request for Single Stage - One Office Furniture and TF / B3321 Post Limited 15,000.00 0.00 Implementati 2021-05-29 2021-05-14 2021-07-10 2021-07-24 Coordination Quotations Envelope Furnishing Equipment at the on PIU GH-EHPMP-234256-GO-RFQ Under Program Implementation and Request for Single Stage - One / Supply of Office Stationery TF / B3321 Post Limited 7,000.00 0.00 Implementati 2021-05-29 2021-05-14 2021-07-10 2021-07-24 Coordination Quotations Envelope for PIU on GH-EHPMP-237730-GO-RFQ Under / Procurement of 1No. 4x4 Program Implementation and Request for Single Stage - One TF / B3321 Post Limited 200,000.00 0.00 Implementati 2021-06-12 2021-06-03 2021-08-07 2021-08-28 Double Cabin Pick-up and Coordination Quotations Envelope on 2No. SUV vehicles NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-EHPMP-170162-CS-CQS / Consultancy Service for the Institutional Strengthening, Consultant Under Preparation of Outreach and / Knowledge and Capacity Post Qualification Open - National 120,000.00 0.00 2020-10-20 2021-01-07 2020-11-10 2021-01-15 2020-12-24 2021-05-10 2021-01-23 2021-02-27 2021-08-26 Implementation Communication Strategy on Building Selection Mercury Management in Ghana Page 1 GH-EHPMP-170201-CS- QCBS / Consultancy Service Institutional Strengthening, for the Preparation of Quality And Cost- Under / Knowledge and Capacity Prior Open - International 200,000.00 0.00 2020-11-05 2021-01-08 2020-11-26 2021-01-22 2021-01-09 2021-05-21 2021-02-06 2021-03-08 2021-04-12 2021-05-17 2022-05-17 Outreach and Communication Based Selection Implementation Building Strategy and Campaigns on E- waste and E-waste Fund GH-EHPMP-170200-CS-CQS / Consultancy Service for the Institutional Strengthening, Quality And Cost- Pending Compilation of a National E- TF / B3321 Knowledge and Capacity Post Open - International 200,000.00 0.00 2021-03-15 2021-04-05 2021-05-10 2021-06-02 2021-06-23 2021-07-28 2021-08-12 2022-08-12 Based Selection Implementation waste Inventory (NEI) for Building Ghana GH-EHPMP-169688-CS-CQS / Consulting Services for the Institutional Strengthening, Consultant Pending Compilation of a National TF / B3321 Knowledge and Capacity Post Qualification Open - International 150,000.00 0.00 2021-04-15 2021-05-06 2021-06-19 2021-07-19 2021-08-23 2022-08-23 Implementation Mercury Inventory (NMI) for Building Selection Ghana GH-EHPMP-170428-CS-CQS / Consultancy Service for the Policy Dialogue and Quality And Cost- Pending Preparation of Technology TF / B3321 Post Open - International 450,000.00 0.00 2021-04-12 2021-05-03 2021-06-16 2021-07-14 2021-08-13 2021-09-17 2021-10-22 2022-10-22 Regulatory Enhancements Based Selection Implementation Roadmaps on Artisanal Small Scale Mining (ASGM) in Ghana GH-EHPMP-171039-CS-CQS / Design and Supervision of the Construction of (up to) Demonstrating Application of Quality And Cost- Pending Ten (10) Clean Mining TF / B3321 Technological Tools and Post Open - National 200,000.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-02 2021-08-01 2021-09-05 2021-10-10 2022-10-10 Based Selection Implementation Demonstration Centers in the Economic Approaches Northern, Middle and Southern Sectors of Ghana GH-EHPMP-171040-CS-CQS / Production of a Standard Design and Supervision for Demonstrating Application of Consultant Pending the Construction of Collection TF / B3321 Technological Tools and Post Qualification Open - National 200,000.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2023-08-08 Implementation and Dismantling Centers in at Economic Approaches Selection least 5 to 10 E-waste Hotspots Outside Accra GH-EHPMP-171042-CS- QCBS / Design and Demonstrating Application of Quality And Cost- Pending supervision of (at least) 1 and, TF / B3321 Technological Tools and Post Open - National 200,000.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-02 2021-08-01 2021-09-05 2021-10-10 2023-12-18 Based Selection Implementation up-to 2 National Buy-Back & Economic Approaches Holding Centers for E-waste GH-EHPMP-170703-CS-CQS / Consultancy Service for the Consultant Policy Dialogue and Pending Development of TF / B3321 Post Qualification Open - National 200,000.00 0.00 2021-07-22 2021-08-12 2021-09-25 2021-10-25 2021-11-29 2022-05-28 Regulatory Enhancements Implementation Implementation Plan for the E- Selection waste Policy of Ghana GH-EHPMP-170389-CS-CQS / Training of Environmental Protection Agency (EPA) and Institutional Strengthening, Consultant MESTI staff as well as officers Pending TF / B3321 Knowledge and Capacity Post Qualification Open - National 80,000.00 0.00 2021-05-07 2021-05-28 2021-07-11 2021-08-10 2021-09-14 2023-09-04 from the Customs Division of Implementation Building Selection the Ghana Revenue Authority (GRA) on E-waste Managemnt and E-waste Fund GH-EHPMP-170348-CS-CQS / Technical Assistance to E- Institutional Strengthening, Consultant waste Associations/Co- Pending TF / B3321 Knowledge and Capacity Post Qualification Open - National 100,000.00 0.00 2021-04-20 2021-05-11 2021-06-24 2021-07-24 2021-08-28 2022-02-24 operatives on Safe Handling Implementation Building Selection and Recycling of E-waste and Development GH-EHPMP-171038-CS-CQS Consultant / Consulting Service to Assess Policy Dialogue and Pending TF / B3321 Post Qualification Open - National 100,000.00 0.00 2021-11-30 2021-12-21 2022-02-03 2022-03-05 2022-04-09 2022-10-16 the Economics of the Eco- Regulatory Enhancements Implementation Selection Levy in Ghana GH-EHPMP-171167-CS-CQS / Outreach to Local Institutional Strengthening, Consultant Governments and Non- Pending TF / B3321 Knowledge and Capacity Post Qualification Open - National 80,000.00 0.00 2022-02-03 2022-02-24 2022-04-09 2022-05-09 2022-06-13 2024-09-20 Governmental Organizations Implementation Building Selection and Consultants in Charge of Investment in ASGM GH-EHPMP-171041-CS-CQS / Technical Assistance to Demonstrating Application of Consultant Interested Private Operators Pending TF / B3321 Technological Tools and Post Qualification Open - National 100,000.00 0.00 2023-01-19 2023-02-09 2023-03-25 2023-04-24 2023-05-29 2025-04-28 and Scrap Dealers in the E- Implementation Economic Approaches Selection waste Industry on Bidding and Operating Centers in Ghana GH-EHPMP-170197-CS-CQS / Media Training on Health Institutional Strengthening, Consultant Risks and Positive Pending TF / B3321 Knowledge and Capacity Post Qualification Open - National 80,000.00 0.00 2022-01-18 2022-02-08 2022-03-24 2022-04-23 2022-05-28 2024-07-16 Development and Successful Implementation Building Selection Pilots in Addressing Mercury Management in ASGM GH-EHPMP-171033-CS-CQS / Consultancy Service to Consultant Policy Dialogue and Pending Conduct an Economic TF / B3321 Post Qualification Open - International 100,000.00 0.00 2022-12-18 2023-01-08 2023-02-21 2023-03-23 2023-04-27 2024-02-20 Regulatory Enhancements Implementation Assessment of Plastics in E- Selection waste in Ghana GH-EHPMP-170700-CS-CQS / Consulting Service for the Assessment of Access to Consultant Policy Dialogue and Pending Finance for Artisanal and TF / B3321 Post Qualification Open - National 100,000.00 0.00 2021-12-15 2022-01-05 2022-02-18 2022-03-20 2022-04-24 2023-04-29 Regulatory Enhancements Implementation Small Scale Miners (ASGM) and Selection Preparation of Financial Roadmaps for ASGM GH-EHPMP-170424-CS-CQS / Consultancy Service for the Consultant Development Interim Policy Dialogue and Pending TF / B3321 Post Qualification Open - National 150,000.00 0.00 2023-11-07 2023-11-28 2024-01-11 2024-02-10 2024-03-16 2025-03-19 Standards for Mercury Regulatory Enhancements Implementation Selection Management Along the Mercury Value-Chain in Ghana Page 2 GH-EHPMP-170413-CS-CQS / Consultancy Service to Assess National Institutional Policies and Legislative Gaps Consultant Policy Dialogue and Pending in Mercury Management and TF / B3321 Post Qualification Open - International 150,000.00 0.00 2021-09-30 2021-10-21 2021-12-04 2022-01-03 2022-02-07 2022-11-04 Regulatory Enhancements Implementation Develop Consolidated Legal Selection Framework to Meet all Requirements of the Minamata Convention in Ghana GH-EHPMP-170199-CS-CQS / Updating of University of Institutional Strengthening, Consultant Mines and Technology Pending TF / B3321 Knowledge and Capacity Post Qualification Limited 60,000.00 0.00 2022-10-10 2022-10-24 2022-11-23 2022-12-28 2023-12-23 Courses to include New Implementation Building Selection Innovations and Technologies in Mining GH-EHPMP-170181-CS-CQS / Awareness Raising on Health Institutional Strengthening, Consultant Pending Impacts of Mercury TF / B3321 Knowledge and Capacity Post Qualification Open - National 80,000.00 0.00 2022-01-11 2022-02-01 2022-03-17 2022-04-16 2022-05-21 2024-10-27 Implementation Management and Solutions in Building Selection Mining Communities INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-EHPMP-171169-CS-CQS / Coordinator for the Africa Individual Program Implementation and Pending Environmental Health and / Post Consultant Limited 150,000.00 0.00 2020-09-01 2020-09-06 2020-09-27 2020-11-01 2023-11-01 Coordination Implementation Pollution Management Selection (AEHPM) Programme GH-EHPMP-177665-CS-INDV Individual Program Implementation and Pending / Recruitment of Financial / Post Consultant Limited 40,000.00 0.00 2020-09-01 2020-09-06 2020-09-27 2020-11-01 2021-11-01 Coordination Implementation Management Specialist Selection GH-EHPMP-177667-CS-INDV Individual Program Implementation and Pending / Procurement of Procurement / Post Consultant Open 40,000.00 0.00 2020-09-01 2020-10-20 2020-11-10 2020-12-15 2021-12-15 Coordination Implementation Specialist Selection GH-EHPMP-177668-CS-INDV Individual / Recruitment of Program Implementation and Pending / Post Consultant Open 35,000.00 0.00 2020-09-01 2020-10-20 2020-11-10 2020-12-15 2021-12-15 Environmental and Social Coordination Implementation Selection Specialist GH-EHPMP-177672-CS-INDV Individual Program Implementation and Pending / Project Communication and / Post Consultant Open 35,000.00 0.00 2020-09-10 2020-10-29 2020-11-19 2020-12-24 2021-06-22 Coordination Implementation Reporting Specialist Selection GH-EHPMP-196406-CS-INDV / Consultancy Service for the Program Implementation and TF / B3246 Prior Direct Selection Direct 9,500.00 14,035.20 Signed 2020-10-01 2020-10-16 2020-10-11 2020-11-20 2020-10-28 2020-12-09 2020-11-22 Preparation of Project Coordination Implementation Manual GH-EHPMP-238908-CS-CDS / Consulting service for the Demonstrating Application of preparation of project Vision Pending TF / B3321 Technological Tools and Post Direct Selection Direct 68,965.52 0.00 2021-06-17 2021-06-27 2021-07-26 2021-08-25 for the Establishment of Implementation Economic Approaches National Buy-back/Holding Centers GH-EHPMP-238913-CS-CDS / Consultancy Service for the Demonstrating Application of preparation of project Vision Pending TF / B3321 Technological Tools and Post Direct Selection Direct 50,000.00 0.00 2021-06-17 2021-06-27 2021-08-04 2021-09-03 for the Establishment of E- Implementation Economic Approaches waste Collection and Dismantling Centers GH-EHPMP-238919-CS-CDS / Consultancy Service for the Demonstrating Application of Pending preparation of project Vision TF / B3321 Technological Tools and Prior Direct Selection Direct 100.00 0.00 2021-06-17 2021-06-27 2021-08-04 2021-09-03 Implementation for the Establishment of Clean Economic Approaches Mining Demonstration Centers Page 3 MINISTRY OF HEALTH Transforming Health Systems for Universal Care Project Project Procurement Plan Financial Year 2016/2017 IDA CREDIT No. 5836-KE GFF Grant Agreement TF0A2561 PHRD Grant Agreement TF0A2792 General 1. Project information: The Government of Kenya has applied for a Credit from the International Development Association supporting the Transforming Health Systems or Universal Care Project 2. Bank’s approval Date of the procurement Plan [Original::] 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 1st June, 2016 to 31st December, 2017 II. Goods and Works and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Method Threshold Prior Review Threshold 1 ICB – Works ≥US$15 million ≥US$10 million 2 NCB- Works =US$ 10,000,000 turnkey, supply & Contract installation of plant RFQ None and equipment, and PPP) Goods, information ICB, NCB, Direct >=US$ 2,000,000 technology and non- Contract consulting services RFQ None II. Selection of Consultants Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Type of Procurement Procurement Prior Review Remarks Method Thresholds (Estimated Cost of the Contract/Package) Consultants: firms QCBS, QBS, FBS, >=US$ 1,000,000 CQS, Single Source Selection Consultants: IC (Open, 3CV, or >=US$ 300,000 Individual SSS) III. Short list comprising entirely of national consultants Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT Bangladesh : Bangladesh Urban Resilience Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-02-23 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149493 GPN Date: Project Name: Bangladesh Urban Resilience Project Loan / Credit No: IDA / 55990 Rajdhani Unnayan Kartripakhha Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned URP/RAJUK/W-1 / Construction of 10 Storied plus 2 Basements Office Component B: Vulnerability Single Stage - One 14,260,000.0 13,551,622. 2021-10- Building with Research, IDA / 55990 Assessment of Critical and Prior Request for Bids Open - International Signed 2019-08-18 2019-11-04 2019-08-29 2019-11-06 2019-10-10 2019-12-30 2019-12-04 2020-03-22 2020-01-08 2020-10-20 Envelope 0 53 29 Training and Testing Essential Facilities Laboratory Facilities for Urban Resilience Unit, RAJUK URP/RAJUK/W-1A / Construction of Shed Component B: Vulnerability ,Partition and supportive Request for Single Stage - One 2018-06- IDA / 55990 Assessment of Critical and Post Open - National 12,987.00 0.00 Canceled 2018-03-15 2018-05-06 Accessories for Quotations Envelope 05 Essential Facilities Accommodation of PIU Office Security URP/RAJUK/W-1B / Component B: Vulnerability Request for Single Stage - One 2019-06- Renovation of office utility IDA / 55990 Assessment of Critical and Post Open - National 12,990.00 0.00 Canceled 2018-04-16 2018-06-11 Quotations Envelope 11 Space at Level 9 Essential Facilities URP/RAJUK/G-W1C / Component B: Vulnerability Request for Single Stage - One 2019-07- Renovation of Wash room and IDA / 55990 Assessment of Critical and Post Open - National 12,990.00 0.00 Canceled 2018-05-18 2018-07-13 Quotations Envelope 13 others Space at Level 9 Essential Facilities URP/RAJUK/W-2A / Component B: Vulnerability Request for Single Stage - One 2020-08- Renovation of Wash Rooms for IDA / 55990 Assessment of Critical and Post Limited 23,400.00 23,409.41 Signed 2020-06-18 2020-06-15 2020-07-19 2020-07-01 Quotations Envelope 18 PIU Office Essential Facilities URP/RAJUK/W-2 / Component B: Vulnerability Refurbishment of PIU Office Single Stage - One 2021-02- IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 88,500.00 86,437.19 Signed 2020-08-30 2020-09-15 2020-09-04 2020-09-20 2020-09-18 2020-10-08 2020-10-09 2020-10-21 2020-11-13 2020-10-29 and Renovation of Utility Envelope 11 Essential Facilities Spaces GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual URP/RAJUK/G-9 / Procurement of Earthquake & Component B: Vulnerability Seismic Equipment for Single Stage - One IDA / 55990 Assessment of Critical and Prior Request for Bids Open - International 3,545,450.00 0.00 Canceled 2018-01-31 2018-02-25 2018-02-07 2018-04-26 2018-03-21 2018-04-26 2018-05-02 2018-10-27 2018-06-06 2018-08-08 Vulnerability Assessment of Envelope Essential Facilities Critical Assets and etc. for URU URP/RAJUK/G-10 / Procurement of Earthquake & Component B: Vulnerability Seismic Equipment for Single Stage - One IDA / 55990 Assessment of Critical and Prior Request for Bids Open - International 3,389,610.00 0.00 Canceled 2018-01-31 2018-02-07 2018-02-07 2018-04-26 2018-03-21 2018-04-26 2018-05-02 2018-10-27 2018-06-06 2018-07-18 Developing Risk Sensitive Envelope Essential Facilities Land Use Planning and etc for URU. URP/RAJUK/G-11 / Procurement of Earthquake & Component B: Vulnerability Single Stage - One Seismic Equipment for IDA / 55990 Assessment of Critical and Prior Request for Bids Open - International 3,255,840.00 0.00 Canceled 2018-01-31 2018-02-25 2018-02-07 2018-04-26 2018-03-21 2018-05-08 2018-05-02 2018-06-30 2018-06-06 2018-12-03 Envelope Laboratory and field testing Essential Facilities and etc. for URU Component B: Vulnerability URP/RAJUK/G-4 / Supply of Single Stage - One IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 389,610.00 109,645.38 Signed 2018-03-01 2018-05-21 2018-03-01 2018-03-31 2018-06-06 2018-04-30 2018-07-19 2018-06-04 2018-07-29 2019-06-04 Furniture for PIU office Envelope Essential Facilities URP/RAJUK/G-1A / Mail Component B: Vulnerability domain and its accessories Request for Single Stage - One IDA / 55990 Assessment of Critical and Post Open - National 6,490.00 0.00 Canceled 2017-09-21 2017-09-21 2017-09-21 purhase & installation for Quotations Envelope Essential Facilities Emergecy Office use of PIU, URP/RAJUK/G-14 / Variable Refregerant Flow (VRF) Air Component B: Vulnerability Single Stage - One Conditioning system supply IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 128,310.00 108,698.29 Signed 2018-04-01 2018-10-22 2018-04-06 2018-10-23 2018-05-06 2018-11-08 2018-06-05 2018-11-25 2018-07-10 2018-12-10 2019-07-10 Envelope and installation for the Essential Facilities renovation work of URP, RAJUK URP/RAJUK/G-1-1 / Supply Component B: Vulnerability Single Stage - One of Computer and Related IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 194,810.00 173,285.54 Signed 2018-05-01 2018-04-01 2018-05-06 2018-06-05 2018-04-19 2018-07-05 2018-06-05 2018-08-09 2018-06-20 2019-08-09 Envelope Equipment for PIU ,URP:RAJUK Essential Facilities URP/RAJUK/G-3-1 / Procurement of Motor Vehicle for PIU of URPRAJUK-Phase1 : Component B: Vulnerability Single Stage - One i) 1no 4WD Sports Utility IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 448,050.00 391,465.99 Signed 2018-03-11 2018-03-06 2018-03-14 2018-04-15 2018-04-09 2018-05-22 2018-04-25 2018-06-26 2018-06-06 2019-06-26 Envelope Vehicle ii) 4 nos Double Cabin Essential Facilities 4WD Pick-up and iii) 1 no Microbus URP/RAJUK/G-3-2 / Procurement of Motor Vehicle for PIU of URPRAJUK-Phase2 : Component B: Vulnerability Single Stage - One i) 1no 4WD Sports Utility IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 629,870.00 576,293.15 Signed 2018-04-08 2018-03-23 2018-04-08 2018-05-08 2018-04-16 2018-06-12 2018-04-25 2018-07-17 2018-06-06 2019-07-17 Envelope Vehicle ii) 5 nos Double Cabin Essential Facilities 4WD Pick-up and iii) 3 no Microbus Page 1 URP/RAJUK/G-2B / Supply of Component B: Vulnerability Request for Single Stage - One Stationery for Emergency IDA / 55990 Assessment of Critical and Post Open - National 6,250.00 5,902.19 Signed 2018-11-25 2018-12-10 2018-12-26 2018-12-24 2019-01-25 Quotations Envelope Office Use of PIU Essential Facilities URP/RAJUK/G-2C / Supply of Component B: Vulnerability Request for Single Stage - One Office Goods for Emergency IDA / 55990 Assessment of Critical and Post Open - National 6,250.00 5,878.21 Signed 2019-01-06 2018-12-10 2019-02-06 2018-12-24 2019-03-08 Quotations Envelope Office Use of PIU Essential Facilities URP/RAJUK/G-15 / Procurement of Field Component B: Vulnerability Single Stage - One Equipment for Vulnerability IDA / 55990 Assessment of Critical and Post Request for Bids Open - International 1,613,725.00 1,188,000.00 Signed 2018-12-26 2018-12-23 2018-12-31 2019-01-03 2019-02-11 2019-02-25 2019-03-13 2019-03-31 2019-04-17 2019-05-06 2019-10-14 Envelope Assessment Aspect of Essential Facilities Structures & Geo-physics URP/RAJUK/G-12 / Component B: Vulnerability Single Stage - One Procurement of Seismic Lab IDA / 55990 Assessment of Critical and Prior Request for Bids Open - International 2,544,204.00 1,726,315.19 Signed 2018-12-26 2019-01-01 2018-12-31 2019-01-03 2019-02-11 2019-02-20 2019-03-13 2019-04-16 2019-04-17 2019-05-16 2019-10-14 Envelope Equipment for URU Essential Facilities URP/RAJUK/G-13 / Component B: Vulnerability Single Stage - One Procurement of Seismic Field IDA / 55990 Assessment of Critical and Prior Request for Bids Open - International 2,623,370.00 2,035,000.00 Signed 2018-12-26 2019-01-01 2018-12-31 2019-01-15 2019-02-11 2019-03-04 2019-03-13 2019-04-29 2019-04-17 2019-07-07 2019-10-14 Envelope Equipment for URU Essential Facilities URP/RAJUK/G-16 / Procurement of Equipment for Component B: Vulnerability Single Stage - One Exploration of RSLUP Profile: IDA / 55990 Assessment of Critical and Post Request for Bids Open - International 1,593,350.00 0.00 Canceled 2018-12-26 2018-12-23 2018-12-31 2019-01-03 2019-02-11 2019-02-25 2019-03-13 2019-06-17 2019-04-17 2019-10-14 Envelope 200 kN Truck Mounted CPT Essential Facilities Equipment URP/RAJUK/G-17 / Procurement of Equipment for Component B: Vulnerability Single Stage - One Exploration of RSLUP Profile: IDA / 55990 Assessment of Critical and Prior Request for Bids Open - International 1,593,350.00 1,000,000.00 Signed 2019-08-20 2019-08-29 2019-08-25 2019-09-02 2019-10-06 2019-10-21 2019-11-05 2019-12-17 2019-12-10 2020-01-26 2020-06-07 Envelope 200 kN Truck Mounted CPT Essential Facilities Equipment URP/RAJUK/G-18 / Supply & Installation of PA System, Component B: Vulnerability Telecommunication, Access Single Stage - One IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 80,500.00 0.00 Canceled 2019-10-20 2019-11-05 2019-10-25 2019-11-06 2019-11-08 2019-11-25 2019-11-22 2019-12-03 2019-12-27 2020-03-26 Control & Security and Envelope Essential Facilities General Electrical Equipment for PIU Office URP/RAJUK/G-19 / Component B: Vulnerability Procurement of Motorcycle for Single Stage - One IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 29,500.00 0.00 Canceled 2019-11-03 2019-12-04 2019-11-08 2019-12-04 2019-11-22 2019-12-26 2019-12-13 2020-01-13 2020-01-17 2020-04-16 PIU of Urban Resilience Envelope Essential Facilities Project: RAJUK Part URP/RAJUK/G-2D / Supply of Component B: Vulnerability Request for Single Stage - One Office Goods-1 for Emergency IDA / 55990 Assessment of Critical and Post Limited 5,925.00 5,771.18 Signed 2019-10-23 2019-11-11 2019-11-23 2019-11-24 2019-12-23 Quotations Envelope Office Use of PIU Essential Facilities URP/RAJUK/G-2E / Supply of Component B: Vulnerability Request for Single Stage - One Stationery-1 for Emergency IDA / 55990 Assessment of Critical and Post Limited 5,925.00 5,850.73 Signed 2019-10-30 2020-02-27 2019-11-30 2020-03-09 2019-12-30 Quotations Envelope Office Use of PIU Essential Facilities URP/RAJUK/G-18-1 / Supply & Installation of PA System, Component B: Vulnerability Telecommunication, Access Single Stage - One IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 81,000.00 79,823.26 Signed 2019-12-19 2020-02-24 2019-12-22 2020-02-25 2020-01-12 2020-03-16 2020-01-26 2020-05-03 2020-03-01 2020-06-03 2020-05-30 Control & Security and Envelope Essential Facilities General Electrical Equipment for PIU Office URP/RAJUK/G-19-1 / Component B: Vulnerability Procurement of Motorcycle for Single Stage - One IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 29,500.00 28,303.56 Signed 2020-03-16 2020-06-28 2020-03-23 2020-06-28 2020-04-06 2020-07-16 2020-04-27 2020-07-26 2020-06-01 2020-08-18 2020-08-30 PIU of Urban Resilience Envelope Essential Facilities Project: RAJUK Part URP/RAJUK/G-23 / Procurement of Equipment: Component B: Vulnerability Single Stage - One Cutter Crane with 10 inch RCC IDA / 55990 Assessment of Critical and Post Request for Bids Open - International 350,000.00 0.00 Canceled 2020-06-15 2020-06-16 2020-06-20 2020-06-17 2020-08-01 2020-08-06 2020-08-31 2020-08-31 2020-10-05 2021-04-03 Envelope Slab Cutting Capacity & 3.65 Essential Facilities Ton Lifting Capacity URP/RAJUK/G-20 / Procurement of ICT Component B: Vulnerability Single Stage - One Equipment for Deploying IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 813,000.00 0.00 Canceled 2020-03-08 2020-03-09 2020-03-12 2020-03-10 2020-04-09 2020-04-29 2020-04-30 2020-05-24 2020-06-04 2020-10-02 Envelope Electronic Construction Essential Facilities Permitting (ECP) System in RAJUK URP/RAJUK/G-20-1 / Procurement of ICT Component B: Vulnerability Single Stage - One Equipment for Deploying IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 810,000.00 688,141.73 Signed 2020-06-28 2020-06-28 2020-07-01 2020-06-28 2020-07-22 2020-07-23 2020-08-12 2020-08-12 2020-09-16 2020-08-19 2021-01-14 Envelope Electronic Construction Essential Facilities Permitting (ECP) System in RAJUK URP/RAJUK/G-24 / Procurement of Equipment: Component B: Vulnerability Single Stage - One Cutter Crane with 10 inch RCC IDA / 55990 Assessment of Critical and Post Request for Bids Open - International 350,000.00 350,000.00 Signed 2020-11-09 2020-11-09 2020-11-12 2020-11-09 2020-12-24 2020-12-28 2021-01-23 2021-01-05 2021-02-27 2021-02-07 2021-08-26 Envelope Slab Cutting Capacity & 3.65 Essential Facilities Ton Lifting Capacity URP/RAJUK/G-21 / Supply of Component B: Vulnerability Single Stage - One Smart IT Equipment & Office IDA / 55990 Assessment of Critical and Post Request for Bids Open - National 65,700.00 48,283.22 Signed 2021-03-14 2021-04-13 2021-03-17 2021-04-15 2021-04-07 2021-05-06 2021-04-21 2021-05-16 2021-05-26 2021-06-10 2021-08-24 Envelope Machinery Essential Facilities URP/RAJUK/G-2F / Supply of Component B: Vulnerability Request for Single Stage - One Stationery-2 for Emergency IDA / 55990 Assessment of Critical and Post Limited 5,873.00 5,862.37 Signed 2021-05-20 2021-05-20 2021-06-20 2021-05-31 2021-07-20 Quotations Envelope Office Use of PIU Essential Facilities NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual URP/RAJUK/NCS-1 / Hiring of Leased Lines for the Project Component B: Vulnerability Request for Single Stage - One Pilot Sites to facilitate the IDA / 55990 Assessment of Critical and Post Limited 10,700.00 1,950.72 Signed 2019-11-24 2019-12-02 2019-12-25 2019-12-22 2020-06-22 Quotations Envelope Networking Infrastructure Essential Facilities Supporting of the ECP System Page 2 URP/RAJUK/NCS-2 / Hiring of Leased Lines for the RAJUK Component B: Vulnerability Zonal Offices to Facilitate the IDA / 55990 Assessment of Critical and Post Direct Selection Direct 25,300.00 25,295.43 Signed 2020-07-30 2020-08-06 2020-08-04 2020-08-09 2020-08-28 2020-08-27 2022-04-30 Networking Infrastructure Essential Facilities Supporting of the ECP System CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual URP/RAJUK/S-6 / Component C: Improved Consultancy Services for Quality And Cost- IDA / 55990 Construction, Urban Prior Open - International 3,522,730.00 5,110,247.81 Signed 2017-05-15 2017-06-05 2017-07-20 2017-08-25 2018-02-09 2017-10-20 2018-04-15 2017-12-01 2018-05-22 2018-02-16 2018-06-30 2018-03-23 2018-10-03 2020-06-30 Operationalizing the URU in Based Selection Planning, and Development RAJUK URP/RAJUK/S-7 / Assessing the Current State and Deploying a Web-based Component C: Improved Quality And Cost- Integrated Information IDA / 55990 Construction, Urban Prior Open - International 1,998,260.00 5,209,290.85 Signed 2017-05-15 2017-06-05 2017-07-20 2017-08-25 2018-02-09 2017-10-20 2017-12-01 2018-05-19 2018-02-16 2018-06-30 2018-03-23 2018-10-03 2020-06-30 Based Selection Management System for the Planning, and Development Construction Permit System of RAJUK URP/RAJUK/S-4 / Consultancy Services for Component B: Vulnerability Vulnerability Assessment and Quality And Cost- IDA / 55990 Assessment of Critical and Prior Open - International 6,781,520.00 8,210,272.05 Signed 2017-09-21 2017-09-21 2017-10-05 2017-11-02 2017-11-09 2018-01-31 2018-06-10 2018-03-14 2018-09-16 2018-04-18 2018-10-31 2020-06-30 Prioritized Investment Plan for Based Selection Essential Facilities Critical Assets in Dhaka for URU URP/RAJUK/S-5 / Consultancy Services for Component B: Vulnerability Quality And Cost- Development of a Risk- IDA / 55990 Assessment of Critical and Prior Open - International 6,296,550.00 7,184,152.72 Signed 2017-10-04 2017-10-04 2017-10-18 2017-11-15 2017-11-07 2018-02-13 2018-04-12 2018-03-27 2018-09-17 2018-05-01 2018-10-31 2020-06-30 Based Selection sensitive Land Use Planning Essential Facilities Practice for URU URP/RAJUK/S-11 / Consultancy Services for Design and Supervision of Component B: Vulnerability Urban Resilience Unit (URU) Quality And Cost- IDA / 55990 Assessment of Critical and Prior Open - International 2,425,950.00 3,010,367.57 Signed 2017-10-04 2017-10-04 2018-02-11 2018-03-11 2018-06-09 2018-04-03 2018-07-21 2018-07-23 2018-08-25 2018-08-16 2020-10-24 Building including Research, Based Selection Essential Facilities Training, and Testing Laboratory facilities under RAJUK in Dhaka, Bangladesh URP/RAJUK/S-9 / Component C: Improved Quality And Cost- Consultancy Services for IDA / 55990 Construction, Urban Prior Open - International 3,240,260.00 4,805,526.56 Signed 2017-09-21 2017-09-21 2018-03-11 2018-02-09 2018-04-22 2018-07-21 2018-05-21 2018-09-08 2018-07-23 2018-10-13 2018-10-30 2020-10-30 Based Selection Building Code Enforcement Planning, and Development URP/RAJUK/S-14 / Consultancy Services for the Component C: Improved Consultant Designing Website & Archiving IDA / 55990 Construction, Urban Post Qualification Open - National 37,500.00 33,977.01 Signed 2018-11-15 2018-11-26 2018-12-06 2018-12-03 2019-01-19 2019-01-31 2019-02-18 2019-03-21 2019-03-25 2019-04-04 2019-09-21 Project Documents for URU, Planning, and Development Selection RAJUK URP/RAJUK/S-8 / Component C: Improved Consultancy Services for Quality And Cost- IDA / 55990 Construction, Urban Prior Open - International 3,542,210.00 0.00 Canceled 2017-05-15 2017-06-05 2017-07-20 2017-08-25 2018-02-09 2017-10-20 2017-11-19 2018-05-21 2018-03-04 2018-04-08 2020-06-30 Professional Accreditation Based Selection Planning, and Development Program in RAJUK URP/RAJUK/S-8-1 / Component C: Improved Consultancy Services for Quality And Cost- IDA / 55990 Construction, Urban Prior Open - International 3,542,210.00 0.00 Canceled 2018-10-15 2018-10-15 2018-10-15 2018-11-06 2018-10-28 2018-10-28 2018-11-27 2018-12-27 2019-01-31 2020-06-30 Professional Accreditation Based Selection Planning, and Development Program in RAJUK URP/RAJUK/S-8A / Component C: Improved Consultant Consultancy Services for IDA / 55990 Construction, Urban Post Qualification Open - International 995,000.00 998,815.25 Signed 2020-05-25 2020-05-31 2020-06-15 2020-07-29 2020-08-26 2020-08-28 2020-11-05 2020-10-02 2021-03-01 2022-03-26 Professional Accreditation Planning, and Development Selection Program in RAJUK INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component A: Reinforcing Individual the Country’s Emergency S1 / Procurement Specialist IDA / 55990 Prior Consultant Open 0.00 285,867.35 Signed 2016-04-28 2016-05-05 Management Response Selection Capacity Component A: Reinforcing S2 / Senior Financial Individual the Country’s Emergency Management & Planning IDA / 55990 Prior Consultant Open 0.00 285,867.35 Signed 2016-04-28 2016-05-05 Management Response Specialist Selection Capacity Component B: Vulnerability Individual URP/RAJUK/S-3 / IDA / 55990 Assessment of Critical and Post Consultant Limited 162,337.66 221,547.96 Signed 2018-06-03 2018-05-31 2018-06-08 2018-05-31 2018-06-29 2018-06-04 2018-08-03 2018-07-01 2019-01-30 Procurement Specialist Essential Facilities Selection URP/RAJUK/S-15 / Environmental Impact Component B: Vulnerability Assessment for Proposed 30 IDA / 55990 Assessment of Critical and Post Direct Selection Direct 95,000.00 88,776.10 Signed 2019-04-28 2019-05-02 2019-05-04 2019-05-08 2019-07-01 2019-05-30 2019-09-29 Storied Building of Urban Essential Facilities Resilience Unit URP/RAJUK/S-13 / Environmental Impact Component B: Vulnerability Individual Assessment of Proposed 30 IDA / 55990 Assessment of Critical and Post Consultant Limited 15,580.00 0.00 Canceled 2018-04-30 2018-05-05 2018-05-26 2018-06-30 2018-12-27 storied Urban Resilience Unit Essential Facilities Selection Building Page 3 PROCUREMENT PLAN (Textual Part) Project information: Tonga Safe and Resilient Schools Project (P174434) Project Implementation agency: Ministry of Education and Training Date of the Procurement Plan: May 2021 Period covered by this Procurement Plan: May 2021 – September 2021 Preamble: In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Tonga’s Public Procurement Regulations (2015), available at http://finance.gov.to/node/166 , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts; publication of contract award information; rights for the Bank to review procurement documentation and activities; and an effective complaints mechanism When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Other None PROCUREMENT Tonga : Tonga Safe and Resilient Schools Project PLAN General Information Country: Tonga Bank’s Approval Date of the Original Procurement Plan: 2021-06-02 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174434 GPN Date: Project Name: Tonga Safe and Resilient Schools Project Loan / Credit No: / Ministry of Education and Training Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TO-MET-232657-GO-RFQ / Pending Supply of Office Request for Single Stage - One / Post Limited 0.00 Implementati 2021-05-14 2021-06-15 2021-07-15 Equipment/Furniture (tables, Quotations Envelope on chairs, cabinets, etc) Pending TO-MET-232661-GO-RFQ / Request for Single Stage - One / Post Limited 0.00 Implementati 2021-05-12 2021-06-15 2021-07-15 Supply of IT Equipment Quotations Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TO-MET-232654-CS-LCS / Least Cost Pending Recruitment of Design and / Prior Open - International 0.00 2021-06-15 2021-07-06 2021-07-27 2021-08-17 2021-08-24 2021-09-07 2021-09-28 2022-03-27 Selection Implementation Supervision Firm INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TO-MET-232644-CS-INDV / Individual Recruitment of the Project / Post Consultant Open 0.00 Under Review 2021-05-07 2021-06-21 2021-06-02 2021-06-07 2021-06-15 2021-12-15 Manager Selection Individual TO-MET-232647-CS-INDV / / Post Consultant Open 0.00 Under Review 2021-05-07 2021-06-21 2021-06-02 2021-06-02 2021-06-15 2021-12-12 Recruitment of Engineer Selection TO-MET-232648-CS-INDV / Individual Recruitment of Project / Post Consultant Open 0.00 Under Review 2021-05-07 2021-06-21 2021-06-02 2021-06-07 2021-06-15 2021-12-12 Accountant Selection TO-MET-232649-CS-INDV / Individual Recruitment of Procurement / Post Consultant Open 0.00 Under Review 2021-05-07 2021-06-21 2021-06-02 2021-06-07 2021-06-15 2021-12-12 Officer Selection TO-MET-232650-CS-INDV / Individual Under Recruitment of Safeguards / Post Consultant Open 0.00 2021-05-07 2021-06-21 2021-06-02 2021-06-07 2021-06-15 2021-12-12 Implementation Officer Selection TO-MET-232651-CS-INDV / Individual Pending Recruitment Contracts / Post Consultant Open 0.00 2021-06-01 2021-06-30 2021-07-05 2021-07-15 2022-01-11 Implementation Manager Selection TO-MET-232652-CS-INDV / Individual Pending Recruitment Education / Post Consultant Open 0.00 2021-06-01 2021-06-27 2021-07-04 2021-07-15 2022-01-11 Implementation Coordinator Selection Individual TO-MET-232653-CS-INDV / Pending / Post Consultant Open 0.00 2021-06-01 2021-06-28 2021-07-03 2021-07-15 2022-01-11 Recruitment EMIS Officer Implementation Selection Page 1 PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of Congo – Regional Disease Surveillance Systems Enhancement - P167817 Project Implementation agency: UGP PDSS Date of the Procurement Plan: June 2019 Period covered by this Procurement Plan: June 2019 – December 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Borrower’s Public Procurement Law No 10/010 of April 27, 2010 (PPL) and the Manual of Procedures of the PPL as per Borrower’s Decree No 10/22 of June 2, 2010, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Standard Bidding Documents: All standard bidding documents to be used for the Project under NCB shall be found acceptable to the World Bank before their use during the implementation of Project; (b) Eligibility: Eligibility of bidders and acceptability of their goods and services shall not be based on their nationality and/or their origin; and association with a national firm shall not be a condition for participation in a bidding process. Therefore, except for the ineligibility situations referred to in paragraphs 1.10(a) (i) and 1.10(a) (ii) of the Procurement Guidelines, the eligibility of bidders must be based solely on their qualification, experience and capacity to carry out the contract related to the specific bidding process; (c) Advertising and Bid Preparation Time: Bidding opportunities shall be advertised at least in a national newspaper of wide circulation and on the website of the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) and bidders should be given at least 30 days from the date of invitation to bid or the date of availability of the bidding documents, whichever is later; (d) Criteria for Qualification of Bidders: Qualification criteria shall only concern the bidder’s capability and resources to perform the contract taking into account objective and measurable factors. Such criteria for qualification of bidders shall be clearly specified in the bidding documents; (e) Bid Evaluation and Contract Award: A contract shall be awarded to the substantially responsive and lowest evaluated bidder provided that such bidder meets the qualification criteria specified in the bidding documents. No scoring system shall be allowed for the evaluation of bids, and no “blanket” limitation to the number of lots which can be awarded to a bidder shall apply. The criteria for bid evaluation and the contract award conditions shall be clearly specified in the bidding documents; (f) Preferences: No preference shall be given to domestic/regional bidders; to domestically/regionally manufactured goods; and to bidders forming a joint venture with a national firm or proposing national sub-contractors or carrying out economic activities in the territory of the Recipient; (g) Publication of Contract Award: Information on all contract awards shall be published in at least a national newspaper of wide circulation or in the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) web-site; (h) Fraud and Corruption: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy to sanction firms or individuals found to have engaged in fraud and corruption as set forth in the Procurement Guidelines; (i) Inspection and Audit Rights: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy with respect to inspection and audit of accounts, records and other documents relating to the bid submission and contract performance; (j) Requirement for administrative documents and/or tax clearance certificate: The bidding documents shall not require foreign bidders to produce any administrative or tax related certificates prior to confirmation of awarding a contract; and (k) Modifications of a Signed Contract: Any change in the contract amount which, singly or combined with all previous changes, increases the original contract amount by fifteen (15) percent or more must be done through an amendment to the signed contract instead of signing a new contract. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. “Not Applicable” PROCUREMENT Central Africa : Regional Disease Surveillance Systems Enhancement Project (REDISSE) Phase IV PLAN General Information Country: Central Africa Bank’s Approval Date of the Original Procurement Plan: 2019-06-10 2021-05-16 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167817 GPN Date: 2020-05-18 Project Name: Regional Disease Surveillance Systems Enhancement Project (REDISSE) Phase IV Loan / Credit No: / , IDA / D5160, IDA / 64980, IDA / 64990 R Executing Agency(ies): DC-MINISTERE DE LA SANTE PUBLIQUE WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 1: Strengthening ZR-DRC-MSP-117854-CW- Pending Surveillance and Laboratory Single Stage - One 2020-05- RFB / Construction de / Prior Request for Bids Open - National 8,500,000.00 0.00 Implementat 2019-08-12 2019-08-17 2019-09-28 2019-10-28 2019-12-02 Capacity to Rapidly detect Envelope 30 laboratoires de référence ion Outbreaks ZR-DRC-MSP-117857-CW- Component 1: Strengthening Pending RFB / Réhabilitation de Surveillance and Laboratory Single Stage - One 2020-06- / Prior Request for Bids Open - National 7,000,000.00 0.00 Implementat 2019-08-19 2019-08-24 2019-10-05 2019-11-04 2019-12-09 laboratoires dans la zone Capacity to Rapidly detect Envelope 06 ion d'intervention du projet Outbreaks ZR-DRC-MSP-117888-CW- RFQ / Réhabilitation des Pending Component 3: Public Health Request for Single Stage - One 2020-04- locaux pour abriter les centres / Post Limited 500,000.00 0.00 Implementat 2019-09-07 2019-11-02 Workforce Development Quotations Envelope 30 médicaux (Postes d'inspection ion Frontalières (PIF) ZR-DRC-MSP-184472-CW- Component 1: Strengthening RFQ / Réhabiliter 15 locaux Pending Surveillance and Laboratory Request for Single Stage - One 2021-04- devant abriter les centres IDA / 64980 Post Limited 110,000.00 0.00 Implementat 2020-09-01 2020-10-27 Capacity to Rapidly detect Quotations Envelope 25 médicaux aux 15 PoE ion Outbreaks désignés ZR-DRC-MSP-184473-CW- Component 1: Strengthening Pending RFQ / Réhabiliter 18 locaux Surveillance and Laboratory Request for Single Stage - One 2021-04- IDA / 64980 Post Limited 30,000.00 0.00 Implementat 2020-09-06 2020-11-01 pour les soins des animaux et Capacity to Rapidly detect Quotations Envelope 30 ion la quarantaine animale Outbreaks ZR-DRC-MSP-184475-CW- Component 1: Strengthening RFB / Réhabilitation des Pending Surveillance and Laboratory Single Stage - One 2021-12- laboratoires provinciaux IDA / 64980 Post Request for Bids Open - National 9,000,000.00 0.00 Implementat 2021-02-19 2021-02-24 2021-04-07 2021-05-07 2021-06-11 Capacity to Rapidly detect Envelope 08 humains et des cliniques de ion Outbreaks plantes Component 1: Strengthening ZR-DRC-MSP-184479-CW- Pending Surveillance and Laboratory Request for Single Stage - One 2021-09- RFQ / Réhabiliter le Bureau IDA / D5160 Post Limited 39,900.00 0.00 Implementat 2021-01-28 2021-03-25 Capacity to Rapidly detect Quotations Envelope 21 National du PNCPS ion Outbreaks ZR-DRC-MSP-184494-CW- RFQ / Construction dans les sites sentilles 50 bureaux des services de santé animale afin Component 1: Strengthening d'assurer une meilleure Pending Surveillance and Laboratory Request for Single Stage - One 2021-05- coouverture sanitaire des IDA / D5160 Post Limited 120,000.00 0.00 Implementat 2020-09-13 2020-11-08 Capacity to Rapidly detect Quotations Envelope 07 maladies zoonotiques ion Outbreaks Fourniture des mobiliers de bureau en faveur des Coordinations Locales du PNMLS Kikwit et Tshikapa) ZR-DRC-MSP-184495-CW- RFQ / Réhabiliter 80 bureaux Component 1: Strengthening des services de santé animale Pending Surveillance and Laboratory Request for Single Stage - One 2021-05- dans les sites sentilles afin IDA / 64980 Post Limited 150,000.00 0.00 Implementat 2020-09-09 2020-11-04 Capacity to Rapidly detect Quotations Envelope 03 d'assurer une meilleure ion Outbreaks coouverture sanitaire des maladies zoonotiques ZR-DRC-MSP-184496-CW- Component 1: Strengthening Pending RFQ / Construction d'un Surveillance and Laboratory Request for Single Stage - One 2021-10- IDA / 64980 Post Limited 200,000.00 0.00 Implementat 2021-02-15 2021-04-12 bâtiment abritant le siège de Capacity to Rapidly detect Quotations Envelope 09 ion CDC Outbreaks ZR-DRC-MSP-117872-CW- Component 1: Strengthening RFB / Construction et Surveillance and Laboratory Single Stage - One 2020-06- équipement d'un laboratoire / Post Request for Bids Open - National 2,000,000.00 0.00 Canceled 2019-08-21 2019-08-26 2019-10-07 2019-11-06 2019-12-11 Capacity to Rapidly detect Envelope 08 national de diagnostic Outbreaks vétérinaire de niveau 1 ZR-DRC-MSP-209278-CW- RFQ / Réhabilitation d'un Component 1: Strengthening bâtiment devant abriter les Pending Surveillance and Laboratory Request for Single Stage - One 2021-08- équipements du laboratoire IDA / 64980 Post Limited 100,000.00 0.00 Implementat 2021-01-06 2021-03-03 Capacity to Rapidly detect Quotations Envelope 30 national de contrôle qualité ion Outbreaks des médicaments LNCQ LAPHAKI. ZR-DRC-MSP-200120-CW- RFQ / Construction / Réhabilitation dans les sites sentinelles des services de Component 1: Strengthening santé animale afin d'assurer Pending Surveillance and Laboratory Request for Single Stage - One 2021-11- une meilleure couverture IDA / 64980 Post Limited 420,000.00 0.00 Implementat 2021-04-07 2021-06-02 Capacity to Rapidly detect Quotations Envelope 29 sanitaire des maladies ion Outbreaks zoonotiques dans quatorze (14) sites sentinelles : Bikoro, Gemena, Buta, Monkoto, Idiofa, Popokabaka, Mwe ZR-DRC-MSP-200124-CW- Component 1: Strengthening Pending RFQ / Réhabilitation deux (2) Surveillance and Laboratory Request for Single Stage - One 2021-09- IDA / 64980 Post Limited 250,000.00 0.00 Implementat 2021-01-10 2021-03-07 cliniques des plantes à : Capacity to Rapidly detect Quotations Envelope 03 ion Kinshasa et Lubumbashi. Outbreaks Page 1 ZR-DRC-MSP-200125-CW- RFB / Construction / Réhabilitation des laboratoires Component 1: Strengthening provinciaux de santé humaine Pending Surveillance and Laboratory Single Stage - One 16,500,000.0 2022-04- à : Kisangani, Kananga, Mbuji IDA / 64980 Prior Request for Bids Open - International 0.00 Implementat 2021-07-12 2021-07-17 2021-08-28 2021-09-27 2021-11-01 Capacity to Rapidly detect Envelope 0 30 mayi, Bandundu ville et ion Outbreaks Mbandaka ; et des laboratoires des hôpitaux provinciaux à : Kindu, Bukavu, Boende. ZR-DRC-MSP-200130-CW- RFB / Construction/ Réhabilitation d’un (1) Component 1: Strengthening Pending laboratoire national de Surveillance and Laboratory Single Stage - One 2022-04- IDA / D5160 Post Request for Bids Open - National 3,000,000.00 0.00 Implementat 2021-07-12 2021-07-17 2021-08-28 2021-09-27 2021-11-01 diagnostic vétérinaire de Capacity to Rapidly detect Envelope 30 ion niveau 1 à Kinshasa ; de trois Outbreaks (3) laboratoires vétérinaires à Lubumbashi, Goma, et Bunia ZR-DRC-MSP-200133-CW- RFB / Réhabilitation des locaux pour abriter les centres médicaux des Postes Component 1: Strengthening d’inspection Frontalières (PIF), Pending Surveillance and Laboratory Single Stage - One 2022-05- des centres des soins des IDA / 64980 Post Request for Bids Open - National 900,000.00 0.00 Implementat 2021-07-19 2021-07-24 2021-09-04 2021-10-04 2021-11-08 Capacity to Rapidly detect Envelope 07 animaux et de la quarantaine ion Outbreaks animale à : Kamako, Kipushi, la petite barrière (Goma), Ruzizi 1 et 2 (Bukavu), Kavivira, Mahagi ZR-DRC-MSP-200136-CW- RFQ / Réhabilitation du Component 2: Strengthening Pending Bureau National du Emergency Planning and Request for Single Stage - One 2021-09- IDA / D5160 Post Limited 50,000.00 0.00 Implementat 2021-01-27 2021-03-24 Programme National de Management Capacity to Quotations Envelope 20 ion Communication et Promotion Rapidly respond to Outbreaks de la Santé (PNCPS) à Kinshasa Component 4: Institutional ZR-DRC-MSP-200137-CW- Pending Capacity Building, Project Single Stage - One 2021-11- RFB / Réhabilitation des IDA / 64980 Post Request for Bids Open - National 1,000,000.00 0.00 Implementat 2021-01-25 2021-01-30 2021-03-13 2021-04-12 2021-05-17 Management, Coordination Envelope 13 Bureaux du Projet REDISSE ion and Advocacy ZR-DRC-MSP-200143-CW- RFQ / Construction des Component 4: Institutional nouveaux locaux (Bureaux et Pending Capacity Building, Project Request for Single Stage - One 2021-09- salles des réunions) pour le IDA / 64980 Post Limited 105,000.00 0.00 Implementat 2021-01-30 2021-03-27 Management, Coordination Quotations Envelope 23 Point Focal Règlement ion and Advocacy Sanitaire International (RSI) du PNHF à Kinshasa. ZR-DRC-MSP-232788-CW- RFQ / Sélection et National Component 1: Strengthening Recrutement d'un consultant Procurement Pending Surveillance and Laboratory Request for Single Stage - One 2022-01- Firme chargé de la IDA / 64980 Post Open - National Document - 1 300,000.00 0.00 Implementat 2021-05-31 2021-07-26 Capacity to Rapidly detect Quotations Envelope 22 réhabilitation du dépôt du Envelope process ion Outbreaks Ministère de la Santé à (Non Bank-SPD) Kinshasa National ZR-DRC-MSP-238522-CW- Component 1: Strengthening Procurement Pending RFQ / Travaux de Surveillance and Laboratory Request for Single Stage - One 2022-03- IDA / 64980 Post Open - National Document - 1 2,500,000.00 0.00 Implementat 2021-07-28 2021-09-22 réhabilitation du laboratoire Capacity to Rapidly detect Quotations Envelope 21 Envelope process ion provincial de Bunia Outbreaks (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-DRC-MSP-117864-GO- Component 1: Strengthening Pending RFB / Acquisition de réactifs Surveillance and Laboratory Single Stage - One / Prior Request for Bids Open - International 5,000,000.00 0.00 Implementati 2019-08-27 2019-09-01 2019-10-13 2019-11-12 2019-12-17 2020-06-14 et de consommables de Capacity to Rapidly detect Envelope on laboratoire Outbreaks Component 2: Strengthening ZR-DRC-MSP-117868-GO- Pending Emergency Planning and Single Stage - One RFB / Acquisition / Prior Request for Bids Open - National 2,000,000.00 0.00 Implementati 2019-07-30 2019-08-04 2019-09-15 2019-10-15 2019-11-19 2020-05-17 Management Capacity to Envelope d'ambulances médicalisées on Rapidly respond to Outbreaks ZR-DRC-MSP-117871-GO- Component 1: Strengthening RFB / fourniture de produits Pending Surveillance and Laboratory Single Stage - One de base et consommables / Prior Request for Bids Open - National 2,000,000.00 0.00 Implementati 2019-07-25 2019-07-30 2019-09-10 2019-10-10 2019-11-14 2020-05-12 Capacity to Rapidly detect Envelope pour le laboratoire de clinique on Outbreaks vétérinaire ZR-DRC-MSP-117874-GO- Component 4: Institutional Pending RFB / Acquisition de 32 Capacity Building, Project Single Stage - One / Prior Request for Bids Open - National 1,600,000.00 0.00 Implementati 2019-07-24 2019-07-29 2019-09-09 2019-10-09 2019-11-13 2020-05-11 véhicules de type 4x4 pour le Management, Coordination Envelope on compte du projet and Advocacy ZR-DRC-MSP-117875-GO- Component 1: Strengthening Pending RFB / Acquisition de Surveillance and Laboratory Single Stage - One / Prior Request for Bids Open - International 1,500,000.00 0.00 Implementati 2019-08-12 2019-08-17 2019-09-28 2019-10-28 2019-12-02 2020-05-30 laboratoires mobiles pour le Capacity to Rapidly detect Envelope on compte du projet REDISSE Outbreaks ZR-DRC-MSP-117877-GO- Component 4: Institutional Pending RFB / Acquisition de matériels Capacity Building, Project Single Stage - One / Prior Request for Bids Open - National 1,500,000.00 0.00 Implementati 2019-07-30 2019-08-04 2019-09-15 2019-10-15 2019-11-19 2020-05-17 roulants divers ( vélos, canot Management, Coordination Envelope on rapides, moto) and Advocacy ZR-DRC-MSP-117878-GO- RFB / Acquisition de chaîne de Component 4: Institutional Pending froid (solaire) et matériels de Capacity Building, Project Single Stage - One / Prior Request for Bids Open - International 1,500,000.00 0.00 Implementati 2019-07-29 2019-08-03 2019-09-14 2019-10-14 2019-11-18 2020-05-16 prélèvement pour le Management, Coordination Envelope on renforcement des unités and Advocacy mobile de santé animale Page 2 ZR-DRC-MSP-117890-GO- RFQ / Acquisition d'équipement de transmission (postes radio émetteur Pending /récepteur et antennes, Component 3: Public Health Request for Single Stage - One / Post Limited 500,000.00 0.00 Implementati 2019-09-14 2019-11-09 2020-05-07 Talkies Walkies), kits de Workforce Development Quotations Envelope on production d'énergie solaire, équipement intervention (dosimètre, débitmètre, explosimètre,) ZR-DRC-MSP-117894-GO- Component 1: Strengthening RFQ / Acquisition des Pending Surveillance and Laboratory Request for Single Stage - One matériels de connexion / Post Limited 500,000.00 0.00 Implementati 2019-08-11 2019-10-06 2020-04-03 Capacity to Rapidly detect Quotations Envelope internet en faveur du Projet (V- on Outbreaks SAT et connexes) ZR-DRC-MSP-118023-GO- Component 4: Institutional RFQ / Achat d'équipement Pending Capacity Building, Project Request for Single Stage - One (kits de protection / Post Open - National 350,000.00 0.00 Implementati 2019-08-26 2019-10-21 2020-04-18 Management, Coordination Quotations Envelope individuelle) pour Biosécurité on and Advocacy et bio sureté ZR-DRC-MSP-118032-GO- RFQ / Acquisition Component 4: Institutional Pending d'équipement de Capacity Building, Project Request for Single Stage - One / Post Open - National 200,000.00 0.00 Implementati 2019-09-15 2019-11-10 2020-05-08 communication Management, Coordination Quotations Envelope on (Visioconférence) et and Advocacy interprétation Component 4: Institutional ZR-DRC-MSP-117880-GO- Pending Capacity Building, Project Single Stage - One RFB / Acquisition de mobiliers / Post Request for Bids Open - National 1,200,000.00 0.00 Implementati 2019-07-25 2019-07-30 2019-09-10 2019-10-10 2019-11-14 2020-05-12 Management, Coordination Envelope et équipement informatiques on and Advocacy ZR-DRC-MSP-184396-GO- Component 1: Strengthening RFB / Fourniture Pending Surveillance and Laboratory Single Stage - One d’équipement et matériels de IDA / D5160 Prior Request for Bids Open - International 6,000,000.00 0.00 Implementati 2021-12-17 2021-12-22 2022-02-02 2022-03-04 2022-04-08 2022-10-05 Capacity to Rapidly detect Envelope laboratoire pour la santé on Outbreaks animale et humaine Component 1: Strengthening ZR-DRC-MSP-184403-GO- Pending Surveillance and Laboratory Single Stage - One RFB / Achat de réactifs et de IDA / 64980 Prior Request for Bids Open - International 5,000,000.00 0.00 Implementati 2021-12-17 2021-12-22 2022-02-02 2022-03-04 2022-04-08 2022-10-05 Capacity to Rapidly detect Envelope consommables de laboratoire on Outbreaks Component 1: Strengthening ZR-DRC-MSP-184407-GO- Pending Surveillance and Laboratory Single Stage - One RFB / Acquisitions de IDA / D5160 Post Request for Bids Open - National 1,500,000.00 0.00 Implementati 2021-03-19 2021-03-24 2021-05-05 2021-06-04 2021-07-09 2022-01-05 Capacity to Rapidly detect Envelope laboratoires mobiles on Outbreaks ZR-DRC-MSP-184409-GO- RFQ / Acquisition d’équipement de transmission (postes radio émetteur Component 1: Strengthening Pending /récepteur et antennes, Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 500,000.00 0.00 Implementati 2021-10-03 2021-11-28 2022-05-27 Talkies Walkies), kits de Capacity to Rapidly detect Quotations Envelope on production d’énergie solaire, Outbreaks équipement intervention (dosimètre, débitmètre, explosimètre) ZR-DRC-MSP-184412-GO- Component 1: Strengthening RFQ / Acquisition des Pending Surveillance and Laboratory Request for Single Stage - One matériels de connexion IDA / D5160 Post Limited 500,000.00 0.00 Implementati 2021-10-03 2021-11-28 2022-05-27 Capacity to Rapidly detect Quotations Envelope internet en faveur du Projet (V- on Outbreaks SAT et connexes) ZR-DRC-MSP-184413-GO- Component 1: Strengthening RFQ / Achat d’équipement Pending Surveillance and Laboratory Request for Single Stage - One (kits de protection IDA / D5160 Post Limited 350,000.00 0.00 Implementati 2021-10-03 2021-11-28 2022-05-27 Capacity to Rapidly detect Quotations Envelope individuelle) pour Biosécurité on Outbreaks et bio sureté ZR-DRC-MSP-184414-GO- RFQ / Achat de moyens de Component 1: Strengthening Pending communication pour la Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 350,000.00 0.00 Implementati 2021-10-03 2021-11-28 2022-05-27 surveillance au niveau central Capacity to Rapidly detect Quotations Envelope on et provinciale (téléphone Outbreaks mobile et GPS) ZR-DRC-MSP-184417-GO- RFQ / Acquisition Component 1: Strengthening Pending d’équipement de Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 200,000.00 0.00 Implementati 2021-10-03 2021-11-28 2022-05-27 communication Capacity to Rapidly detect Quotations Envelope on (Visioconférence) et Outbreaks interprétation ZR-DRC-MSP-184418-GO- RFQ / Production et édition Component 1: Strengthening des outils de gestion pour les Pending Surveillance and Laboratory Request for Single Stage - One centres de surveillance IDA / D5160 Post Limited 100,000.00 0.00 Implementati 2021-10-03 2021-11-28 2022-05-27 Capacity to Rapidly detect Quotations Envelope animale et environnementale on Outbreaks en (registres et notification, fiches de notification) ZR-DRC-MSP-184419-GO- Component 1: Strengthening Pending RFQ / Acquisition de logiciel Surveillance and Laboratory Request for Single Stage - One IDA / 64980 Post Limited 30,000.00 0.00 Implementati 2021-09-16 2021-11-11 2022-05-10 de suivi de gestion des Capacity to Rapidly detect Quotations Envelope on médicaments et intrants Outbreaks ZR-DRC-MSP-184421-GO- Component 1: Strengthening Pending RFQ / Acquisition d'un serveur Surveillance and Laboratory Request for Single Stage - One IDA / 64980 Post Limited 15,000.00 0.00 Implementati 2020-08-04 2020-09-29 2021-03-28 pour le système de Capacity to Rapidly detect Quotations Envelope on surveillance électronique Outbreaks ZR-DRC-MSP-184427-GO- Component 1: Strengthening Pending RFQ / Acquisition des Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 80,000.00 0.00 Implementati 2021-09-02 2021-10-28 2022-04-26 tablettes pour les points Capacity to Rapidly detect Quotations Envelope on d'entrée Outbreaks Page 3 ZR-DRC-MSP-184428-GO- RFQ / Acquisition en Component 1: Strengthening équipements médicaux pour Pending Surveillance and Laboratory Request for Single Stage - One le diagnostic et la prise en IDA / 64980 Post Limited 486,000.00 0.00 Implementati 2021-09-02 2021-10-28 2022-04-26 Capacity to Rapidly detect Quotations Envelope charge (Santé Publique et on Outbreaks Animale) pour les 18 PoE désignés ZR-DRC-MSP-184433-GO- RFQ / Acquisition Component 1: Strengthening Pending d'équipements en Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 65,000.00 0.00 Implementati 2021-09-02 2021-10-28 2022-04-26 renforcement du laboratoire Capacity to Rapidly detect Quotations Envelope on national de contrôle qualité Outbreaks LAPHAKI ZR-DRC-MSP-184434-GO- RFB / Acquisition d'équipements pour les Component 1: Strengthening Pending laboratoires intégrés du Surveillance and Laboratory Single Stage - One IDA / D5160 Post Request for Bids Open - National 1,125,000.00 0.00 Implementati 2020-08-18 2020-08-23 2020-10-04 2020-11-03 2020-12-08 2021-06-06 réseau en matériels pour la Capacity to Rapidly detect Envelope on détection des maladies Outbreaks prioritaires dans les secteurs humain et animal ZR-DRC-MSP-184436-GO- Component 1: Strengthening RFQ / Acquisition en Kits Pending Surveillance and Laboratory Request for Single Stage - One informatiques et bureautiques IDA / D5160 Post Limited 225,000.00 0.00 Implementati 2020-09-02 2020-10-28 2021-04-26 Capacity to Rapidly detect Quotations Envelope les laboratoires intégrés au on Outbreaks réseau ZR-DRC-MSP-184440-GO- RFB / Acquisition Component 1: Strengthening d'équipements des Pending Surveillance and Laboratory Single Stage - One laboratoires intégrés du IDA / D5160 Prior Request for Bids Open - International 2,700,000.00 0.00 Implementati 2020-08-18 2020-08-23 2020-10-04 2020-11-03 2020-12-08 2021-06-06 Capacity to Rapidly detect Envelope réseau en kits et intrants on Outbreaks spécifiques de prélèvement des échantillons ZR-DRC-MSP-184443-GO- RFQ / Acquisition Component 1: Strengthening d'équipements des Pending Surveillance and Laboratory Request for Single Stage - One laboratoires intégrés du IDA / D5160 Post Limited 226,380.00 0.00 Implementati 2021-09-02 2021-10-28 2022-04-26 Capacity to Rapidly detect Quotations Envelope réseau en matériels, kits et on Outbreaks intrants spécifiques de stockage des échantillons ZR-DRC-MSP-184445-GO- RFQ / Acquisition Component 1: Strengthening d'équipements des Pending Surveillance and Laboratory Request for Single Stage - One laboratoires intégrés du IDA / D5160 Post Limited 270,000.00 0.00 Implementati 2021-09-02 2021-10-28 2022-04-26 Capacity to Rapidly detect Quotations Envelope réseau en matériels/kits et on Outbreaks intrants spécifiques de transport des échantillons ZR-DRC-MSP-184447-GO- RFQ / Acquisition en Component 1: Strengthening Pending équipements aux laboratoires Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 168,000.00 0.00 Implementati 2021-09-02 2021-10-28 2022-04-26 intégrés au reseau en kits de Capacity to Rapidly detect Quotations Envelope on prélèvement, stockage et Outbreaks transport d'échantillons ZR-DRC-MSP-184451-GO- Component 1: Strengthening RFQ / Acquisition de matériels Pending Surveillance and Laboratory Request for Single Stage - One et équipements de travail IDA / 64980 Post Limited 115,000.00 0.00 Implementati 2020-10-04 2020-11-29 2021-05-28 Capacity to Rapidly detect Quotations Envelope pour doter les bureaux de on Outbreaks services de santé animale ZR-DRC-MSP-184453-GO- RFQ / Création d'un site Web pour renforcer la Component 1: Strengthening Pending communication Surveillance and Laboratory Request for Single Stage - One IDA / 64980 Post Limited 10,000.00 0.00 Implementati 2021-08-02 2021-09-27 2022-03-26 institutionnelle Capacity to Rapidly detect Quotations Envelope on (communication interne et Outbreaks communication externe en créant un site Web) ZR-DRC-MSP-184454-GO- RFQ / Hébergement et gestion Component 1: Strengthening Pending du Site WEB en Mettant à jour Surveillance and Laboratory Request for Single Stage - One IDA / 64980 Post Limited 36,000.00 0.00 Implementati 2021-08-02 2021-09-27 2022-03-26 périoiquement les Capacity to Rapidly detect Quotations Envelope on informations du PANSS par Outbreaks domaine de RSI ZR-DRC-MSP-184455-GO- Component 1: Strengthening Pending RFQ / Connexion Internet aux Surveillance and Laboratory Request for Single Stage - One IDA / 64980 Post Limited 100,800.00 0.00 Implementati 2020-08-15 2020-10-10 2021-04-08 laboratoires intégrés du Capacity to Rapidly detect Quotations Envelope on réseau multisectoriel Outbreaks ZR-DRC-MSP-184456-GO- Component 1: Strengthening RFQ / Services de transport Pending Surveillance and Laboratory Request for Single Stage - One des échantillons des lieux de IDA / 64980 Post Limited 504,000.00 0.00 Implementati 2021-07-19 2021-09-13 2022-03-12 Capacity to Rapidly detect Quotations Envelope prélèvements aux lieux on Outbreaks d'analyses ZR-DRC-MSP-184457-GO- Component 1: Strengthening Pending RFQ / Acquisition de matériels Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 582,400.00 0.00 Implementati 2021-07-15 2021-09-09 2022-03-08 roulants spécialisés pour le Capacity to Rapidly detect Quotations Envelope on CDC Outbreaks ZR-DRC-MSP-184458-GO- Component 1: Strengthening RFQ / Acquisition de matériel Pending Surveillance and Laboratory Request for Single Stage - One informatique et de IDA / D5160 Post Limited 92,710.00 0.00 Implementati 2021-07-15 2021-09-09 2022-03-08 Capacity to Rapidly detect Quotations Envelope communication pour les on Outbreaks ministères sectoriels ZR-DRC-MSP-184459-GO- RFQ / Regrographie des Component 1: Strengthening Pending directives et normes de Surveillance and Laboratory Request for Single Stage - One IDA / 64980 Post Limited 57,600.00 0.00 Implementati 2021-07-15 2021-09-09 2022-03-08 fonctionnement du reseau de Capacity to Rapidly detect Quotations Envelope on laboratoires et des textes Outbreaks légaux Page 4 ZR-DRC-MSP-184460-GO- Component 1: Strengthening RFQ / Reprographie du Pending Surveillance and Laboratory Request for Single Stage - One document projet de politique IDA / 64980 Post Limited 20,000.00 0.00 Implementati 2020-10-05 2020-11-30 2021-05-29 Capacity to Rapidly detect Quotations Envelope de communication sur les on Outbreaks risques ZR-DRC-MSP-184461-GO- Component 1: Strengthening RFQ / Reprographie du Plan Pending Surveillance and Laboratory Request for Single Stage - One Stratégique National IDA / 64980 Post Limited 20,000.00 0.00 Implementati 2020-09-02 2020-10-28 2021-04-26 Capacity to Rapidly detect Quotations Envelope Multisectoriel de on Outbreaks communication des risques ZR-DRC-MSP-184462-GO- Component 1: Strengthening RFQ / Reprographie des Pending Surveillance and Laboratory Request for Single Stage - One modules et guides de IDA / 64980 Post Limited 10,000.00 0.00 Implementati 2020-11-03 2020-12-29 2021-06-27 Capacity to Rapidly detect Quotations Envelope formation en communication on Outbreaks multisectoriels sur les risques ZR-DRC-MSP-184463-GO- Component 1: Strengthening RFQ / Production des bulletins Pending Surveillance and Laboratory Request for Single Stage - One épidémiologiques mensuels IDA / 64980 Post Limited 42,000.00 0.00 Implementati 2020-09-05 2020-10-31 2021-04-29 Capacity to Rapidly detect Quotations Envelope de surveillance des maladies ( on Outbreaks animales et humaines) ZR-DRC-MSP-184464-GO- RFQ / Reproduction des Component 1: Strengthening supports existants de Pending Surveillance and Laboratory Request for Single Stage - One communications (la boite à IDA / 64980 Post Limited 42,000.00 0.00 Implementati 2020-08-08 2020-10-03 2021-04-01 Capacity to Rapidly detect Quotations Envelope images, les autocollants, les on Outbreaks affiches) sur les relais additionnels ZR-DRC-MSP-184465-GO- Component 1: Strengthening RFB / Acquisition des Pending Surveillance and Laboratory Single Stage - One véhicules de 16 véhicules de IDA / D5160 Post Request for Bids Open - National 800,000.00 0.00 Implementati 2020-08-18 2020-10-13 2021-04-11 Capacity to Rapidly detect Envelope type 4x4 pour le compte du on Outbreaks projet au niveau provincial ZR-DRC-MSP-184466-GO- Component 1: Strengthening Pending RFQ / Fourniture de cinq (5) Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 32,500.00 0.00 Implementati 2020-08-24 2020-10-19 2021-04-17 motos de terrain pour le PF Capacity to Rapidly detect Quotations Envelope on RSI Outbreaks ZR-DRC-MSP-184467-GO- Component 1: Strengthening Pending RFQ / Fourniture Surveillance and Laboratory Request for Single Stage - One IDA / 64980 Post Limited 38,850.00 0.00 Implementati 2020-08-15 2020-10-10 2021-04-08 d'équipements, mobiliers et Capacity to Rapidly detect Quotations Envelope on matériels pour le PF RSI Outbreaks ZR-DRC-MSP-118029-CS- INDV / Achat de moyens de Component 4: Institutional communication pour la Capacity Building, Project Request for Single Stage - One / Post Limited 350,000.00 0.00 Canceled 2019-08-17 2019-10-12 2020-04-09 surveillance au niveau central Management, Coordination Quotations Envelope et provinciale (téléphone and Advocacy mobile et GPS) ZR-DRC-MSP-199481-GO- Component 1: Strengthening RFQ / Fourniture de logiciel Pending Surveillance and Laboratory Request for Single Stage - One de suivi des effets IDA / 64980 Post Limited 30,000.00 0.00 Implementati 2020-12-26 2021-02-20 2021-08-19 Capacity to Rapidly detect Quotations Envelope indésirables des médicaments on Outbreaks et intrants (pharmaco vigilance). ZR-DRC-MSP-199484-GO- RFQ / Reproduction des bulletins épidémiologiques mensuels de surveillance des Component 1: Strengthening maladies (animales et Pending Surveillance and Laboratory Request for Single Stage - One humaines), des supports IDA / D5160 Post Limited 84,000.00 0.00 Implementati 2021-01-16 2021-03-13 2021-09-09 Capacity to Rapidly detect Quotations Envelope existants de communications on Outbreaks (la boite à images, les autocollants, les affiches) sur les relais additionnels (secteur de l'enseignement, ZR-DRC-MSP-199497-GO- RFB / Fourniture en matériels Component 1: Strengthening Pending d'assainissement de base Surveillance and Laboratory Single Stage - One IDA / D5160 Post Request for Bids Open - National 540,000.00 0.00 Implementati 2021-01-05 2021-01-10 2021-02-21 2021-03-23 2021-04-27 2021-10-24 (poubelles, décharges, Capacity to Rapidly detect Envelope on latrines, points d'eau) pour les Outbreaks 18 PoE désignés. ZR-DRC-MSP-199494-GO- RFB / Fourniture de téléphones cellulaires et crédits de communication pour les provinces et les Component 1: Strengthening Pending zones de santé cibles, Surveillance and Laboratory Single Stage - One IDA / 64980 Prior Request for Bids Open - National 2,625,000.00 0.00 Implementati 2021-01-05 2021-01-10 2021-02-21 2021-03-23 2021-04-27 2021-10-24 d’équipements de Capacity to Rapidly detect Envelope on communication Outbreaks (Visioconférence) et interprétation pour les trois (3) secteurs au niveau central, de moyens de communication ZR-DRC-MSP-209269-GO- Component 1: Strengthening Pending RFB / Fourniture de Surveillance and Laboratory Single Stage - One IDA / 64980 Post Request for Bids Open - National 1,800,000.00 0.00 Implementati 2021-01-11 2021-01-16 2021-02-27 2021-03-29 2021-05-03 2021-10-30 médicaments génériques et Capacity to Rapidly detect Envelope on vaccins dans la santé animale Outbreaks Component 1: Strengthening ZR-DRC-MSP-209274-GO- Pending Surveillance and Laboratory Single Stage - One RFB / Fourniture de réactifs et IDA / 64980 Prior Request for Bids Open - National 2,400,000.00 0.00 Implementati 2021-10-19 2021-10-24 2021-12-05 2022-01-04 2022-02-08 2022-08-07 Capacity to Rapidly detect Envelope consommables de laboratoire. on Outbreaks ZR-DRC-MSP-199507-GO- RFQ / Fourniture de chaîne de froid (solaire) et matériel de Component 1: Strengthening Pending prélèvement pour le Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Open - National 320,000.00 0.00 Implementati 2020-12-27 2021-02-14 2021-02-28 renforcement de quatorze Capacity to Rapidly detect Quotations Envelope on (14) sites sentinelles des Outbreaks services de santé animale, et dix-huit (18) PoE de santé humaine. ZR-DRC-MSP-199813-GO- Component 1: Strengthening Pending RFQ / Fourniture de kits et Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 270,000.00 0.00 Implementati 2020-12-27 2021-02-21 2021-08-20 intrants spécifiques de Capacity to Rapidly detect Quotations Envelope on transport des échantillons. Outbreaks Page 5 ZR-DRC-MSP-199826-GO- Component 1: Strengthening Pending RFQ / Fourniture des tablettes Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 80,000.00 0.00 Implementati 2020-12-28 2021-02-22 2021-08-21 pour les points d'entrée et les Capacity to Rapidly detect Quotations Envelope on zones de santé cibles. Outbreaks ZR-DRC-MSP-199836-GO- RFQ / Production et édition des outils de gestion pour les Component 1: Strengthening Pending centres de surveillance Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 100,000.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 animale et environnementale Capacity to Rapidly detect Quotations Envelope on (registres de notification, Outbreaks fiches de notification) dans les zones des provinces cibles. ZR-DRC-MSP-199841-GO- RFB / Fourniture en équipements médicaux pour le diagnostic et la prise en Component 1: Strengthening charge (santé publique et Pending Surveillance and Laboratory Single Stage - One animale) pour les 18 PoE IDA / D5160 Prior Request for Bids Open - International 9,686,000.00 0.00 Implementati 2021-12-23 2021-12-28 2022-02-08 2022-03-10 2022-04-14 2022-10-11 Capacity to Rapidly detect Envelope désignés, d’équipements on Outbreaks diversément spécifiques, de matériels divers pour les sites sentinelles (Minilab, Centrifugeuse, Microscope,etc ZR-DRC-MSP-199846-GO- Component 1: Strengthening Pending RFB / Fourniture Surveillance and Laboratory Single Stage - One IDA / 64980 Post Request for Bids Open - National 1,080,000.00 0.00 Implementati 2020-12-23 2020-12-28 2021-02-08 2021-03-10 2021-04-14 2021-10-11 d’ambulances médicalisées au Capacity to Rapidly detect Envelope on niveau des dix-huit (18) Outbreaks points d'entrée. ZR-DRC-MSP-199851-GO- RFQ / Fourniture d'un serveur Component 1: Strengthening Pending central avec un système Surveillance and Laboratory Request for Single Stage - One IDA / D5160 Post Limited 200,000.00 0.00 Implementati 2020-12-28 2021-02-22 2021-08-21 d'inter opérabilité et Capacity to Rapidly detect Quotations Envelope on interconnectivité intra et Outbreaks intersectorielle ZR-DRC-MSP-199855-GO- RFQ / Fourniture de kits de Component 2: Strengthening Pending production d’énergie solaire, Emergency Planning and Request for Single Stage - One IDA / D5160 Post Limited 250,000.00 0.00 Implementati 2021-10-20 2021-12-15 2022-06-13 équipements intervention Management Capacity to Quotations Envelope on (dosimètre, débitmètre, Rapidly respond to Outbreaks explosimètre). ZR-DRC-MSP-199900-GO- RFQ / Fourniture de mobiliers, matériels et biens pour le Component 4: Institutional Bureau de la coordination du Pending Capacity Building, Project Request for Single Stage - One Projet, les structures du IDA / D5160 Post Limited 200,000.00 0.00 Implementati 2021-01-20 2021-03-17 2021-09-13 Management, Coordination Quotations Envelope ministère de la santé, du on and Advocacy ministrère de pêche et élevage, et du ministère de l'environnement. ZR-DRC-MSP-199901-GO- RFB / Fourniture d'un minibus et de onze (11) véhicules de type 4x4 pour toutes les Component 4: Institutional Pending parties prenantes au Projet au Capacity Building, Project Single Stage - One IDA / D5160 Post Request for Bids Open - National 610,000.00 0.00 Implementati 2021-01-15 2021-01-20 2021-03-03 2021-04-02 2021-05-07 2021-11-03 niveau central : PDSS (3), Management, Coordination Envelope on DGLM (1), DLS (1), PNHF (1), and Advocacy PF RSI (1), MiniPE (1), MiniENV (1), Laboratoire vétérinaire central de Kinshasa (1), comi ZR-DRC-MSP-199902-GO- DIR / Fourniture d'une centaine (100) motos de terrain pour le niveau central, Component 4: Institutional provincial et opérationnel : Pending Capacity Building, Project Cinq (5) pour le Point Focal IDA / D5160 Post Direct Selection Direct 650,000.00 0.00 Implementati 2021-01-11 2021-01-16 2021-02-20 2021-08-19 Management, Coordination RSI, Sept (7) motos pour les on and Advocacy provinces, seize (16) motos pour les laboratoires provinciaux, dix-huit (18) motos pour les poi ZR-DRC-MSP-200161-GO- RFQ / Fourniture de dix-neuf (19) hors bords de 25CV pour les sites sentinelles de santé Component 4: Institutional Pending animale : Bikoro, Monkoto, Capacity Building, Project Request for Single Stage - One IDA / 64980 Post Limited 76,000.00 0.00 Implementati 2020-12-28 2021-02-22 2021-08-21 Mangayi, Kalemie, Bunia, Management, Coordination Quotations Envelope on Tshangalele et pour les and Advocacy équipes d'intervention rapide dans les provinces de l'Equateur et de la Tshuapa. ZR-DRC-MSP-199905-GO- RFQ / Fourniture des matériels de connexion Component 4: Institutional Pending internet en faveur des Capacity Building, Project Request for Single Stage - One IDA / D5160 Post Limited 300,000.00 0.00 Implementati 2020-12-28 2021-02-22 2021-08-21 structures bénéficiaires du Management, Coordination Quotations Envelope on Projet (Acquisition de and Advocacy matériel, maintenance, et paiement de l'abonnement Internet). ZR-DRC-MSP-117861-GO- Component 1: Strengthening RFB / fourniture d'équipement Surveillance and Laboratory Single Stage - One et matériels de laboratoire / Prior Request for Bids Open - International 6,000,000.00 0.00 Canceled 2019-08-20 2019-08-25 2019-10-06 2019-11-05 2019-12-10 2020-06-07 Capacity to Rapidly detect Envelope pour la santé animale et Outbreaks humaine ZR-DRC-MSP-199501-GO- Component 1: Strengthening Pending RFB / Fourniture d'intrants Surveillance and Laboratory Single Stage - One IDA / 64980 Post Request for Bids Open - National 1,800,000.00 0.00 Implementati 2021-01-19 2021-01-24 2021-03-07 2021-04-06 2021-05-11 2021-11-07 spécifiques pour la détection Capacity to Rapidly detect Envelope on des épidémies Outbreaks ZR-DRC-MSP-232300-GO- RFQ / Fourniture de mobiliers, Component 1: Strengthening Pending matériels informatiques et Surveillance and Laboratory Request for Single Stage - One IDA / 64980 Post Open - National 200,000.00 0.00 Implementati 2021-06-06 2021-08-01 2022-01-28 électriques pour le dépôt du Capacity to Rapidly detect Quotations Envelope on ministère de la santé Outbreaks réhabilité Page 6 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-DRC-MSP-200146-NC- DIR / "Accords cadre" (en contractualisation) d'avec les Component 1: Strengthening Pending compagnies aériennes, Surveillance and Laboratory IDA / 64980 Post Direct Selection Direct 100,000.00 0.00 Implementati 2021-01-11 2021-01-16 2021-02-20 2021-08-19 agences de voyage, pour le Capacity to Rapidly detect on transport des échantillons Outbreaks (santé animale et santé humaine). Component 1: Strengthening ZR-DRC-MSP-200158-NC- Pending Surveillance and Laboratory Request for Single Stage - One RFQ / Services spécialisés de IDA / 64980 Post Limited 250,000.00 0.00 Implementati 2021-01-16 2021-03-13 2021-09-09 Capacity to Rapidly detect Quotations Envelope transport des échantillons. on Outbreaks CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-DRC-MSP-184499-CS- Component 1: Strengthening QCBS / Contractualisation Surveillance and Laboratory Quality And Cost- Pending avec une structure spécialisée IDA / 64980 Prior Open - National 5,000,000.00 0.00 2020-08-24 2020-09-14 2020-10-28 2020-11-25 2020-12-25 2021-01-29 2021-03-05 2022-03-05 Capacity to Rapidly detect Based Selection Implementation pour la gestion logistique et Outbreaks chaine d’approvisionnement ZR-DRC-MSP-184500-CS- QCBS / Contractualisation Component 1: Strengthening avec des Centres d’Excellence Surveillance and Laboratory Quality And Cost- Pending IDA / 64980 Prior Open - National 1,200,000.00 0.00 2021-06-27 2021-07-18 2021-08-31 2021-09-28 2021-10-28 2021-12-02 2022-01-06 2023-01-06 et de laboratoires pour la Capacity to Rapidly detect Based Selection Implementation fourniture de service de Outbreaks diagnostic ZR-DRC-MSP-184502-CS- QCBS / Contractualisation Component 1: Strengthening avec une structure spécialisée Surveillance and Laboratory Quality And Cost- Pending IDA / 64980 Post Open - National 900,000.00 0.00 2021-06-27 2021-07-18 2021-08-31 2021-09-28 2021-10-28 2021-12-02 2022-01-06 2023-01-06 pour l’amélioration des Capacity to Rapidly detect Based Selection Implementation systèmes de transport des Outbreaks échantillons ZR-DRC-MSP-184517-CS- Component 1: Strengthening QCBS / Recrutement d’une Surveillance and Laboratory Quality And Cost- Pending IDA / 64980 Post Open - National 150,000.00 0.00 2020-08-24 2020-09-14 2020-10-28 2020-11-25 2020-12-25 2021-01-29 2021-03-05 2022-03-05 firme pour l’audit financier Capacity to Rapidly detect Based Selection Implementation externe du projet Outbreaks ZR-DRC-MSP-184529-CS- Component 1: Strengthening QCBS / Accompagnement de Surveillance and Laboratory Quality And Cost- Pending labo de la RDC au processus IDA / D5160 Post Open - National 109,920.00 0.00 2021-03-20 2021-04-10 2021-05-24 2021-06-21 2021-07-21 2021-08-25 2021-09-29 2022-09-29 Capacity to Rapidly detect Based Selection Implementation d'accreditation et de Système Outbreaks Management de Qualité (SMQ) ZR-DRC-MSP-184542-CS- Component 1: Strengthening QCBS / Recrutement d'un Surveillance and Laboratory Quality And Cost- Pending IDA / 64980 Post Open - National 350,000.00 0.00 2020-08-28 2020-09-18 2020-11-01 2020-11-29 2020-12-29 2021-02-02 2021-03-09 2022-03-09 consultant externe pour le Capacity to Rapidly detect Based Selection Implementation suivi environnemental Outbreaks ZR-DRC-MSP-118031-CS- Component 1: Strengthening Consultant CQS / Recrutement de Surveillance and Laboratory / Post Qualification Open - National 350,000.00 0.00 Canceled 2019-08-22 2019-09-12 2019-10-26 2019-11-25 2019-12-30 2020-06-27 consultant pour faire l'état des Capacity to Rapidly detect Selection lieux des laboratoires Outbreaks ZR-DRC-MSP-117886-CS- Component 1: Strengthening CQS / Contractualisation avec Consultant Surveillance and Laboratory une structure spécialisée pour / Prior Qualification Open - National 900,000.00 0.00 Canceled 2019-08-28 2019-09-18 2019-11-01 2019-12-01 2020-01-05 2020-07-03 Capacity to Rapidly detect l'amélioration des systèmes Selection Outbreaks de transport des échantillons ZR-DRC-MSP-118041-CS- Component 4: Institutional QCBS / Recrutement d'une Capacity Building, Project Quality And Cost- / Post Open - National 150,000.00 0.00 Canceled 2019-09-09 2019-09-30 2019-11-13 2019-12-11 2020-01-10 2020-02-14 2020-03-20 2021-03-20 firme pour l'audit financier Management, Coordination Based Selection externe du projet and Advocacy ZR-DRC-MSP-118040-CS- Component 1: Strengthening CQS / Recrutement d'une Consultant Surveillance and Laboratory firme pour l'élaboration du / Post Qualification Open - National 150,000.00 0.00 Canceled 2019-08-27 2019-09-17 2019-10-31 2019-11-30 2020-01-04 2020-07-02 Capacity to Rapidly detect Plan Stratégique des Selection Outbreaks laboratoires de l'Espace CEEAC ZR-DRC-MSP-118039-CS- CQS / Recrutement d'un Component 1: Strengthening Consultant Cabinet pour élaborer le Surveillance and Laboratory / Post Qualification Open - National 150,000.00 0.00 Canceled 2019-08-14 2019-09-04 2019-10-18 2019-11-17 2019-12-22 2020-06-19 document de réglementation Capacity to Rapidly detect Selection du transport international des Outbreaks échantillons biologiques ZR-DRC-MSP-118038-CS- CQS / Recrutement d'un Component 1: Strengthening Cabinet pour l'élaboration Consultant Surveillance and Laboratory d'un plan stratégique de / Post Qualification Open - National 150,000.00 0.00 Canceled 2019-08-05 2019-08-26 2019-10-09 2019-11-08 2019-12-13 2020-06-10 Capacity to Rapidly detect préparation et de réponse aux Selection Outbreaks épidémies et urgences sanitaires ZR-DRC-MSP-118036-CS- CQS / Recrutement d'une firme pour la mise en place Consultant Component 3: Public Health d'un système d'information / Post Qualification Open - National 150,000.00 0.00 Canceled 2019-08-12 2019-09-02 2019-10-16 2019-11-15 2019-12-20 2020-06-17 Workforce Development qui prend en compte les Selection activités de la santé humaine et animale ZR-DRC-MSP-118035-CS- CQS / Recrutement d'une Consultant Component 3: Public Health firme pour l'élaboration de la / Post Qualification Open - National 150,000.00 0.00 Canceled 2019-08-13 2019-09-03 2019-10-17 2019-11-16 2019-12-21 2020-06-18 Workforce Development stratégie régionale sur les Selection activités transfrontalières Page 7 ZR-DRC-MSP-209283-CS- CQS / Sélection et Component 1: Strengthening Consultant recrutement d'un consultant Surveillance and Laboratory Under IDA / 64980 Post Qualification Open - National 350,000.00 0.00 2021-01-26 2021-05-19 2021-02-16 2021-04-01 2021-05-01 2021-06-05 2021-12-02 firme pour faire l’état des Capacity to Rapidly detect Implementation Selection lieux (Ingénieur Architecte et Outbreaks Bio médical) des laboratoires. ZR-DRC-MSP-199244-CS- QCBS / Sélection et recrutement des structures Component 1: Strengthening spécialisées en stratégie de Surveillance and Laboratory Quality And Cost- Pending IDA / 64980 Prior Open - National 5,000,000.00 0.00 2021-01-26 2021-02-16 2021-04-01 2021-04-29 2021-05-29 2021-07-03 2021-08-07 2022-08-07 gestion logistique et chaine Capacity to Rapidly detect Based Selection Implementation d’approvisionnement des Outbreaks médicaments, intrants et réactifs de laboratoire. ZR-DRC-MSP-199255-CS- CQS / Sélection et recrutement d'un Consultant Component 1: Strengthening firme pour la conception, la Consultant Surveillance and Laboratory Pending mise en place, et la mise en IDA / 64980 Post Qualification Open - National 124,500.00 0.00 2020-12-30 2021-01-20 2021-03-05 2021-04-04 2021-05-09 2021-11-05 Capacity to Rapidly detect Implementation oeuvre des systèmes Selection Outbreaks électroniques de surveillance inter opérable dans le cadre de « Une Santé ». ZR-DRC-MSP-199256-CS- CQS / Sélection et Component 1: Strengthening Consultant recrutement d’une firme pour Surveillance and Laboratory Pending IDA / 64980 Post Qualification Open - National 150,000.00 0.00 2021-01-05 2021-01-26 2021-03-11 2021-04-10 2021-05-15 2021-11-11 l’élaboration du Plan Capacity to Rapidly detect Implementation Selection Stratégique des laboratoires Outbreaks de l’Espace CEEAC. ZR-DRC-MSP-199251-CS- CQS / Sélection et recrutement d'un consultant Component 1: Strengthening Consultant firme pour l'accompagnement Surveillance and Laboratory Pending IDA / 64980 Post Qualification Open - National 109,920.00 0.00 2021-03-25 2021-04-15 2021-05-29 2021-06-28 2021-08-02 2022-01-29 de (s) laboratoire (s) de la RDC Capacity to Rapidly detect Implementation Selection au processus d'accréditation Outbreaks et de Système Management de Qualité (SMQ). ZR-DRC-MSP-199257-CS- QCBS / Sélection et recrutement d'une agence de Component 1: Strengthening communication pour la Surveillance and Laboratory Quality And Cost- Pending IDA / 64980 Post Open - National 950,000.00 0.00 2021-06-29 2021-07-20 2021-09-02 2021-09-30 2021-10-30 2021-12-04 2022-01-08 2023-01-08 gestion de l’information et le Capacity to Rapidly detect Based Selection Implementation développement technique Outbreaks (mise en place d’un portail web). ZR-DRC-MSP-199258-CS- CQS / Sélection et recrutement d’un consultant Component 2: Strengthening Consultant firme pour la mise en place Emergency Planning and Pending IDA / 64980 Post Qualification Open - National 150,000.00 0.00 2021-01-05 2021-01-26 2021-03-11 2021-04-10 2021-05-15 2021-11-11 d’un système d’information Management Capacity to Implementation Selection frontalier qui prend en Rapidly respond to Outbreaks compte les activités de la santé humaine et animale. ZR-DRC-MSP-199261-CS- QCBS / Sélection et recrutement des Centres Component 2: Strengthening d’Excellence et de laboratoires Emergency Planning and Quality And Cost- Pending pour renforcer les capacités IDA / 64980 Prior Open - National 1,200,000.00 0.00 2021-06-29 2021-07-20 2021-09-02 2021-09-30 2021-10-30 2021-12-04 2022-01-08 2023-01-08 Management Capacity to Based Selection Implementation des laboratoires nationaux (en Rapidly respond to Outbreaks santé humaine et en santé animale) à poser des diagnostics. ZR-DRC-MSP-199263-CS- CQS / Sélection et recrutement d'un consultant Consultant Component 3: Public Health Pending firme pour un Audit IDA / 64980 Post Qualification Open - National 100,000.00 0.00 2021-01-25 2021-02-15 2021-03-31 2021-04-30 2021-06-04 2021-12-01 Workforce Development Implementation organisationnel des structures Selection des trois (3) ministères parties prenantes au Projet. ZR-DRC-MSP-199276-CS- QCBS / Sélection et recrutement du (des) bureau Component 4: Institutional (x) d'études chargé (s) du Capacity Building, Project Quality And Cost- Under contrôle et de la surveillance IDA / 64980 Prior Open - National 500,000.00 0.00 2020-12-23 2021-02-18 2021-01-13 2021-02-26 2021-03-26 2021-04-25 2021-05-30 2021-07-04 2022-07-04 Management, Coordination Based Selection Implementation des travaux de construction/ and Advocacy réhabilitation envisagés dans le cadre de la mise en œuvre du Projet. ZR-DRC-MSP-199278-CS- CQS / Sélection d'un cabinet d'avocats pour réaliser un état Component 4: Institutional Consultant des lieux des textes juridiques Capacity Building, Project Pending IDA / 64980 Post Qualification Open - National 100,000.00 0.00 2021-01-11 2021-02-01 2021-03-17 2021-04-16 2021-05-21 2021-11-17 et reglémentaires et élaborer Management, Coordination Implementation Selection les avants projet des textes and Advocacy juridiques pour la mise en œuvre du RSI. ZR-DRC-MSP-199469-CS- Component 4: Institutional CQS / Sélection et Consultant Capacity Building, Project Pending recrutement d’une firme pour IDA / 64980 Post Qualification Open - National 150,000.00 0.00 2020-12-30 2021-01-20 2021-03-05 2021-04-04 2021-05-09 2021-11-05 Management, Coordination Implementation l’audit financier externe du Selection and Advocacy projet. ZR-DRC-MSP-199474-CS- CQS / Sélection et Component 4: Institutional recrutement d'un consultant Consultant Capacity Building, Project Pending firme externe pour le suivi des IDA / 64980 Post Qualification Open - National 350,000.00 0.00 2021-01-05 2021-01-26 2021-03-11 2021-04-10 2021-05-15 2021-11-11 Management, Coordination Implementation études environnementales et Selection and Advocacy la production des différents documents. ZR-DRC-MSP-199475-CS- CQS / Sélection et Component 4: Institutional recrutement d'une ONG pour Consultant Capacity Building, Project Pending la mise en œuvre des activités IDA / 64980 Post Qualification Open - National 300,000.00 0.00 2021-01-05 2021-01-26 2021-03-11 2021-04-10 2021-05-15 2021-11-11 Management, Coordination Implementation de prévention et Selection and Advocacy sensibilisation des Violences Basées sur le Genre Page 8 ZR-DRC-MSP-199476-CS- CQS / Sélection et Component 4: Institutional recrutement d'une ONG Consultant Capacity Building, Project Pending chargée de l'évaluation de la IDA / 64980 Post Qualification Open - National 100,000.00 0.00 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 Management, Coordination Implementation mise en œuvre des activités Selection and Advocacy ayant trait aux Violences Basées sur le Genre ZR-DRC-MSP-199478-CS- CQS / Sélection et Component 4: Institutional Consultant recrutement d’un consultant Capacity Building, Project Pending IDA / 64980 Post Qualification Open - National 150,000.00 0.00 2021-06-01 2021-06-22 2021-08-05 2021-09-04 2021-10-09 2022-04-07 firme pour l’élaboration de la Management, Coordination Implementation Selection stratégie régionale sur les and Advocacy activités transfrontalières. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-DRC-MSP-117851-CS- Component 1: Strengthening CDS / Contractualisation avec Surveillance and Laboratory Pending / Prior Direct Selection Direct 20,000,000.00 0.00 2019-07-22 2019-08-01 2019-10-05 2020-04-02 l'UNFPA pour la fourniture de Capacity to Rapidly detect Implementation médicaments et réactifs Outbreaks ZR-DRC-MSP-117866-CS- Component 2: Strengthening CDS / Contractualisation avec Emergency Planning and Pending l'UNICEF pour la gestion / Prior Direct Selection Direct 5,000,000.00 0.00 2019-07-24 2019-08-03 2019-10-07 2020-04-04 Management Capacity to Implementation logistique et chaine Rapidly respond to Outbreaks d'approvisionnement ZR-DRC-MSP-117882-CS- Component 2: Strengthening CDS / Contractualisation avec Emergency Planning and Pending / Prior Direct Selection Direct 1,200,000.00 0.00 2019-08-19 2019-08-29 2019-11-02 2020-04-30 l'INRB pour la fourniture de Management Capacity to Implementation service de diagnostic Rapidly respond to Outbreaks ZR-DRC-MSP-117885-CS- CDS / Contractualisation avec Component 2: Strengthening BLUES QUARE pour la gestion Emergency Planning and Pending de l'information et le / Prior Direct Selection Direct 950,000.00 0.00 2019-08-27 2019-09-06 2019-11-10 2020-05-08 Management Capacity to Implementation développement technique Rapidly respond to Outbreaks (mise en place d'un portail web) Component 4: Institutional ZR-DRC-MSP-117895-CS- Individual Capacity Building, Project INDV / Recrutement d'un chef IDA / D5160 Prior Consultant Open 400,000.00 82,200.00 Signed 2019-08-13 2020-06-18 2019-10-01 2020-08-25 2019-10-22 2020-09-01 2019-11-26 2020-09-01 2020-05-24 Management, Coordination de projet Selection and Advocacy ZR-DRC-MSP-117896-CS- Component 4: Institutional Individual INDV / Recrutement de deux Capacity Building, Project Under / Prior Consultant Open 400,000.00 0.00 2019-08-13 2019-10-01 2019-10-22 2019-11-26 2020-05-24 comptables pour la gestion du Management, Coordination Implementation Selection projet and Advocacy ZR-DRC-MSP-117897-CS- Component 4: Institutional Individual INDV / Recrutement d'un Capacity Building, Project Pending / Prior Consultant Open 300,000.00 0.00 2019-08-13 2019-10-01 2019-10-22 2019-11-26 2020-05-24 responsable en suivi et Management, Coordination Implementation Selection évaluation du projet and Advocacy ZR-DRC-MSP-118014-CS- Component 4: Institutional Individual INDV / Recrutement d'un Capacity Building, Project / Prior Consultant Open 300,000.00 0.00 Under Review 2019-07-30 2021-03-01 2019-09-17 2019-10-08 2019-11-12 2020-05-10 Spécialiste en Passation des Management, Coordination Selection Marchés and Advocacy ZR-DRC-MSP-118016-CS- Component 4: Institutional Individual INDV / Recrutement d'un Capacity Building, Project Pending / Prior Consultant Open 250,000.00 0.00 2019-07-30 2019-09-17 2019-10-08 2019-11-12 2020-05-10 Assistant Technique en Santé Management, Coordination Implementation Selection Humaine and Advocacy ZR-DRC-MSP-118017-CS- Component 4: Institutional Individual INDV / Recrutement d'un Capacity Building, Project Pending / Prior Consultant Open 250,000.00 0.00 2019-07-30 2019-09-17 2019-10-08 2019-11-12 2020-05-10 Assistant Technique en Santé Management, Coordination Implementation Selection animale and Advocacy ZR-DRC-MSP-118019-CS- Component 4: Institutional Individual INDV / Recrutement d'un Capacity Building, Project Pending / Prior Consultant Open 250,000.00 0.00 2019-07-30 2019-09-17 2019-10-08 2019-11-12 2020-05-10 Assistant Technique en Santé Management, Coordination Implementation Selection végétale and Advocacy ZR-DRC-MSP-118021-CS- Component 4: Institutional INDV / Recrutement d'un Individual Capacity Building, Project Pending Assistant Technique en / Prior Consultant Open 250,000.00 0.00 2019-07-30 2019-09-17 2019-10-08 2019-11-12 2020-05-10 Management, Coordination Implementation sauvegarde environnementale Selection and Advocacy et sociale ZR-DRC-MSP-184519-CS- Component 1: Strengthening INDV / Recrutement de Individual Surveillance and Laboratory Pending consultant pour élaborer le IDA / D5160 Post Consultant Open 60,000.00 0.00 2021-06-16 2021-08-04 2021-08-25 2021-09-29 2022-03-28 Capacity to Rapidly detect Implementation Cadre de Réinsertion des Selection Outbreaks Populations ZR-DRC-MSP-184520-CS- Component 1: Strengthening INDV / Recrutement de Individual Surveillance and Laboratory Pending consultant pour élaborer le IDA / D5160 Post Consultant Open 60,000.00 0.00 2021-06-16 2021-08-04 2021-08-25 2021-09-29 2022-03-28 Capacity to Rapidly detect Implementation Cadre de planification des Selection Outbreaks Peuples Autochtone ZR-DRC-MSP-184521-CS- Component 1: Strengthening INDV / Recrutement de Individual Surveillance and Laboratory Pending consultants pour élaborer les IDA / D5160 Post Consultant Open 60,000.00 0.00 2021-06-16 2021-08-04 2021-08-25 2021-09-29 2022-03-28 Capacity to Rapidly detect Implementation plans de Gestion Selection Outbreaks Environnementale et Sociale ZR-DRC-MSP-184524-CS- Component 1: Strengthening INDV / Recrutement de Individual Surveillance and Laboratory Pending consultants pour élaborer les IDA / D5160 Post Consultant Open 60,000.00 0.00 2021-06-16 2021-08-04 2021-08-25 2021-09-29 2022-03-28 Capacity to Rapidly detect Implementation plans d’engagement des Selection Outbreaks Parties Prenantes Page 9 ZR-DRC-MSP-184526-CS- INDV / Recruter un Consultant Component 1: Strengthening international pour la Individual Surveillance and Laboratory Pending conception et la mise en place IDA / D5160 Post Consultant Open 30,000.00 0.00 2020-08-10 2020-09-28 2020-10-19 2020-11-23 2021-05-22 Capacity to Rapidly detect Implementation des systèmes électroniques de Selection Outbreaks surveillance interopérable dans le cadre de « Une Santé » ZR-DRC-MSP-184531-CS- INDV / Recruter un consultant national pour développer un Component 1: Strengthening Individual guide standard pour réaliser Surveillance and Laboratory Under IDA / D5160 Post Consultant Open 7,870.00 0.00 2020-08-20 2021-03-04 2020-10-08 2020-10-29 2020-12-03 2021-06-01 un état des lieux des textes Capacity to Rapidly detect Implementation Selection juridiques et reglémentaires Outbreaks pour la mise en œuvre du RSI (2005) ZR-DRC-MSP-184532-CS- Component 1: Strengthening INDV / Recruter un consultant Individual Surveillance and Laboratory Pending pour réaliser l'évaluation IDA / D5160 Post Consultant Open 13,140.00 0.00 2020-08-02 2020-09-20 2020-10-11 2020-11-15 2021-05-14 Capacity to Rapidly detect Implementation conjointe des risques liés aux Selection Outbreaks PZD (Grippe Aviaire) ZR-DRC-MSP-184533-CS- Component 1: Strengthening Individual INDV / Recrutement de 2 Surveillance and Laboratory Pending IDA / D5160 Post Consultant Open 20,000.00 0.00 2020-08-16 2020-10-04 2020-10-25 2020-11-29 2021-05-28 consultants nationaux pour la Capacity to Rapidly detect Implementation Selection formation en biosécurité Outbreaks ZR-DRC-MSP-184535-CS- INDV / Recrutement d'un consultant national senior Component 1: Strengthening Individual pour l'élaboration du plan Surveillance and Laboratory Pending IDA / D5160 Post Consultant Open 17,720.00 0.00 2020-10-04 2020-11-22 2020-12-13 2021-01-17 2021-07-16 national d'envoi, de réception, Capacity to Rapidly detect Implementation Selection de stockage et de Outbreaks déploiement des moyens médicaux ZR-DRC-MSP-184536-CS- INDV / Recrutement d'un Component 1: Strengthening consultant national senior Individual Surveillance and Laboratory Pending pour l'élaboration du plan IDA / D5160 Post Consultant Open 17,720.00 0.00 2020-09-04 2020-10-23 2020-11-13 2020-12-18 2021-06-16 Capacity to Rapidly detect Implementation national relatif au Selection Outbreaks déploiement du personnel en situation d’urgence de santé publique ZR-DRC-MSP-184537-CS- INDV / Recrutement d'un Component 1: Strengthening Individual consultant national pour Surveillance and Laboratory Pending IDA / D5160 Post Consultant Open 10,000.00 0.00 2020-08-02 2020-09-20 2020-10-11 2020-11-15 2021-05-14 élaborer le plan Stratégique Capacity to Rapidly detect Implementation Selection National Multisectoriel de Outbreaks communication des risques ZR-DRC-MSP-184540-CS- Component 1: Strengthening INDV / Recruter un consultant Individual Surveillance and Laboratory Pending national pour l'utilisation et IDA / D5160 Post Consultant Open 6,800.00 0.00 2020-08-31 2020-10-19 2020-11-09 2020-12-14 2021-06-12 Capacity to Rapidly detect Implementation l'implémentation de l'outil Selection Outbreaks EMAI ZR-DRC-MSP-199247-CS- INDV / Sélection et recrutement d'un (1) Component 1: Strengthening consultant international et Individual Surveillance and Laboratory Pending deux (2) consultants IDA / 64980 Post Consultant Open 50,000.00 0.00 2020-12-24 2021-02-11 2021-03-04 2021-04-08 2021-10-05 Capacity to Rapidly detect Implementation nationaux pour réaliser Selection Outbreaks l'évaluation conjointe des risques liés aux pandémies zoonotiques. ZR-DRC-MSP-199265-CS- Component 4: Institutional Individual INDV / Sélection et Capacity Building, Project Under IDA / 64980 Prior Consultant Open 375,000.00 0.00 2020-12-23 2020-12-23 2021-02-10 2021-03-03 2021-04-07 2021-10-04 recrutement d’un Spécialiste Management, Coordination Implementation Selection en Suivi- Evaluation and Advocacy ZR-DRC-MSP-199268-CS- Component 4: Institutional Individual INDV / Sélection et Capacity Building, Project Pending IDA / 64980 Prior Consultant Open 337,500.00 0.00 2020-12-23 2021-02-10 2021-03-03 2021-04-07 2021-10-04 recrutement d’un Spécialiste Management, Coordination Implementation Selection en Santé animale and Advocacy ZR-DRC-MSP-199270-CS- Component 4: Institutional Individual INDV / Sélection et Capacity Building, Project Under IDA / 64980 Prior Consultant Open 337,500.00 0.00 2020-12-23 2021-06-15 2021-02-10 2021-03-03 2021-04-07 2021-10-04 recrutement d’un Spécialiste Management, Coordination Implementation Selection en Epidémiologie and Advocacy ZR-DRC-MSP-199274-CS- INDV / Sélection et Recrutement d'un (1) Ingénieur conseil chargé du Component 4: Institutional Individual contrôle et de la surveillance Capacity Building, Project Pending IDA / 64980 Post Consultant Open 50,000.00 0.00 2020-12-23 2021-02-10 2021-03-03 2021-04-07 2021-10-04 des travaux de construction/ Management, Coordination Implementation Selection réhabilitation dont le and Advocacy démarrage est envisagé dans le cadre de la mise en œuvre du Projet pour l'an 2020. ZR-DRC-MSP-209292-CS- INDV / Sélection et recrutement d'un consultant Component 4: Institutional Individual international pour Capacity Building, Project Pending IDA / 64980 Post Consultant Open 30,000.00 0.00 2020-12-23 2021-02-10 2021-03-03 2021-04-07 2021-10-04 l'élaboration des protocoles Management, Coordination Implementation Selection pour la gestion des urgences and Advocacy en lien avec MVE, COVID, Rougéole et Choléra ZR-DRC-MSP-209294-CS- INDV / Sélection et Component 4: Institutional recrutement d'un consultant Individual Capacity Building, Project Pending national pour l'élaboration des IDA / 64980 Post Consultant Open 20,000.00 0.00 2020-12-23 2021-02-10 2021-03-03 2021-04-07 2021-10-04 Management, Coordination Implementation protocoles pour la gestion des Selection and Advocacy urgences en lien avec MVE, COVID, Rougéole et Choléra Page 10 ZR-DRC-MSP-218040-CS- CDS / Contractualisation par entente directe avec l'OMS Component 2: Strengthening pour l'appui au plan de 90 Emergency Planning and Pending IDA / 64980 Prior Direct Selection Direct 8,000,000.00 0.00 2021-03-17 2021-03-27 2021-05-31 2021-11-27 jours et renforcement des Management Capacity to Implementation activités post Ebola à Rapidly respond to Outbreaks l'Equateur et Provinces voisines ZR-DRC-MSP-218042-CS- CDS / Contractualisation par Component 2: Strengthening entente avec UNICEF, appui au Emergency Planning and Pending plan de 90 jours et IDA / 64980 Prior Direct Selection Direct 4,000,000.00 0.00 2021-03-23 2021-04-02 2021-06-06 2021-12-03 Management Capacity to Implementation renforcement des activités Rapidly respond to Outbreaks post Ebola à l'Equateur et Provinces voisines ZR-DRC-MSP-218043-CS- CDS / Contractualisation par Component 2: Strengthening entente directe avec OIM pour Emergency Planning and Pending l'appui au plan de 90 jours et IDA / 64980 Prior Direct Selection Direct 2,000,000.00 0.00 2021-03-24 2021-04-03 2021-06-07 2021-12-04 Management Capacity to Implementation renforcement des activités Rapidly respond to Outbreaks post Ebola à l'Equateur et Provinces voisines ZR-DRC-MSP-227756-CS- INDV / Recrutement d'un consultant chargé d’appuyer Component 1: Strengthening le PDSS dans l’élaboration du Individual Surveillance and Laboratory Under dossier technique et du devis IDA / 64980 Post Consultant Limited 7,000.00 0.00 2021-04-29 2021-04-05 2021-05-04 2021-05-25 2021-06-29 2021-12-26 Capacity to Rapidly detect Implementation des travaux de Selection Outbreaks réaménagement de l’Entrepôt Central du Ministère de la Santé ZR-DRC-MSP-228866-CS- CDS / Contractualisation par Component 1: Strengthening entente directe avec Monsieur Surveillance and Laboratory Pending IDA / 64980 Post Direct Selection Direct 147,290.00 0.00 2021-04-30 2021-05-10 2021-07-14 2022-01-10 Camille BAMONEKENE Capacity to Rapidly detect Implementation WASUKAMA, Comptable en Outbreaks appui au Projet REDISSE IV ZR-DRC-MSP-232228-CS- CDS / Contractualisation par Entente Directe avec CRESTE Bureau d'Etudes chargé de la Component 1: Strengthening Validation du Rapport de Surveillance and Laboratory Under mission de l'Ingénieur Jean- IDA / 64990 Post Direct Selection Direct 200,000.00 0.00 2021-05-27 2021-05-04 2021-06-06 2021-08-10 2022-02-06 Capacity to Rapidly detect Implementation Paul MAKOMA INRB, Outbreaks Elaboration du DAO et du Contrôle et Surveillance des travaux de réhabilitation du Laboratoire de Bunia ZR-DRC-MSP-232790-CS- INDV / Contractualisation en Component 1: Strengthening entente directe avec Individual Surveillance and Laboratory Under Monsieur AHLEGNAN KOMLAN IDA / 64980 Post Consultant Direct 116,200.00 0.00 2021-05-27 2021-05-18 2021-06-06 2021-06-27 2021-08-01 2022-01-28 Capacity to Rapidly detect Implementation Victor, consultant spécialiste Selection Outbreaks en gestion financière en appui au Projet REDISSE ZR-DRC-MSP-232061-CS- Component 1: Strengthening INDV / Contractualisation par Individual Surveillance and Laboratory Under entente directe avec Monsieur IDA / 64980 Post Consultant Direct 53,400.00 0.00 2021-05-27 2021-05-18 2021-06-06 2021-06-27 2021-08-01 2022-01-28 Capacity to Rapidly detect Implementation Dimitri MATUTEZULWA Selection Outbreaks LUBOKOLO ZR-DRC-MSP-232064-CS- INDV / Contractualisation par Component 1: Strengthening Individual entente directe avec Monsieur Surveillance and Laboratory IDA / 64980 Post Consultant Direct 36,822.50 0.00 Under Review 2021-05-31 2021-05-18 2021-06-10 2021-07-01 2021-08-05 2022-02-01 Camille BAMONEKENE Capacity to Rapidly detect Selection WASUKAMA, Comptable en Outbreaks appui au Projet REDISSE IV ZR-DRC-MSP-235192-CS- CDS / Contractualisation par entente directe (ED) avec la Firme United States Component 1: Strengthening Pharmacopeia (USP) pour Surveillance and Laboratory Pending appuyer l'UG PDSS dans IDA / 64980 Post Direct Selection Direct 70,000.00 0.00 2021-06-24 2021-07-04 2021-09-07 2022-03-06 Capacity to Rapidly detect Implementation l'établissement de l'état des Outbreaks lieux, l'élaboration du dossier technique et du devis des travaux de réaménagement des Laboratoires Page 11 I. Dispositions Générales 1. 1 Informations sur le pays: Pays : NIGER Emprunteur : NIGER Dénomination du Projet : PROJET D'APPUI A LA POPULATION ET A LA SANTE Références du Crédit : MINISTERE DE LA SANTE Agence d’Exécution du Projet : PUBLIQUE 1.2 Date d’approbation du plan par la Banque: 1. 3 Période couverte par le présent plan de passation des 18 MOIS marchés: II. Tableau des Méthodes Méthodes de Seuils Seuils (Montants Catégorie des dépenses passation des (Montants en FCFA) marchés en $ US) C>=5 C>= 2 500 000 AOI 000,000 000 50,000 = = 25 000 000 Tout ED Tout montant montant Biens Services (Autres que les AOI C>=500,000 C>=250 000 000 2 services de consultants) 50,000= = 25 000 000 Tout ED Tout montant montant C>= SFQC, SFQ C>= 100 000 000 200,000 Services de consultant SFQC, SCBD, 3 < 200,000 C> 100 000 000 (Firmes) QC, SMC Tout SED Tout montant montant Tout IC Tout montant montant Consultant Individuel Tout SED Tout montant montant Ateliers de Formations, Avis préalable Tout Tout montant séminaires, voyages d'études du TTL montant III Tableau des Seuils (Risque substantiel) Seuils Seuils (Montant Catégorie des Dépenses (Montant en en FCFA) USD) >=10 000 1 Travaux >= 5 000 000 000 000 Biens et Services (autres que les services de >=1 000 2 >= 500 000 000 consultants) 000 3 Consulting Services >=500 000 >= 250 000 000 Travaux Tout contrat par entente Biens 4 >=100 000 >=50 000 000 directe Services de Consultants (Firmes) Consultant individuel (Entente directe) >= 100 000 >= 50 000 000 5 Consultant individuel (Comparaison des CV) >=200 000 >= 100 000 000 AOI Appel d'Offre International AON Appel d'Offre National CF Consultation de Fournisseurs ED Entente Directe SFQ Sélection Fondée sur la C Qualité et le Coût Sélection Fondée sur la SFQ Qualité Sélection Fondée sur les QC Qualifications des Consultants SCB Sélection dans le Cadre d'un D Budget Déterminé SMC Sélection au " Moindre Coût" SED Sélection par Entente directe IV Calendrier de passation des marchés 4-1 Fournitures, et services (autres que les services de consultants) Marge de Examen Date Montant Procurem Date d Réf. Montant en Présélection Préférenc par la probable Description* Estimatif en ent signat No. dollar US (oui/non) e Banque d’ouverture FCFA Method du con (oui/non) Prior / Post des plis Reproduction de supports de données pour les formations sanitaires publiques (lot 1) et 12/22 1 Reproduction en suppports 680,000 NON NON AOI à priori 11/08/2015 340,000,000 5 SNIS/PEV pour les 21 districts sanitaires, 419 CSI et 1340 cases de santé (Lot 2) Fourniture de materiel roulant pour la Coordination 01/16 2 du Fonds Commun ( 1 vehicule 56,000 NON NON AON Post 12/03/2015 28,000,000 5 4 X 4 station wagon de supervision) Fourniture et installation du matériel informatique , 01/16 3 bureautique et didactique 1,800,000 NON NON AOI à priori 12/03/2015 900,000,000 6 pour la Direction des Statistiques et de ses démembrements pour la mise en place du DHIS2 Mise en reseau avec l'interconexion entre les differentes structures sanitaires publiques et 01/16 4 8,000,000 4,000,000,0 NON NON AOI à priori 12/03/2015 privées et le renforcement 6 00 de la connexion internet au niveau des huit regions et les districts 01/16 5 Acquisition de Contraceptifs 2,000,000 1,000,000,0 NON NON ED (1) à priori 12/03/2015 6 00 Coût Total Fournitures en 6,268,000,0 FCFA 12,536,000 00 (1): La justification devrait être soumise á l'avis préalable de la banque et les piéces du processus doivent être archivées aux fins de revue á postériori de la banque 4.2 Services des consultants Date problablab Examen Montant Montant le pour Date de Réf. Méthode de par la Description du contrat estimatif Dollar estimatif l'ouverture signature du Commentaires No. sélection Banque US FCFA des contrat Prior / Post propositio ns Recrutement d'un consultant pour l'élaboration de la 11/16/201 40,000 QC Post 12/01/2015 strategie d'utilisation des 20,000,000 5 1 agents communautaires Recrutement d'un consultant pour élaborer la stratégie 11/16/201 nationale de renforcement des 60,000 QC Post 12/01/2015 30,000,000 5 pouvoirs économiques des 2 femmes Recrutement d'un consultant pour faire une évaluation de la Déclaration du Gouvernement en matière de 11/16/201 20,000 QC Post 12/01/2015 politique de population et 10,000,000 5 Elaboration de la Politique de Population (Consultant 3 National) Recrutement d'un consultant pour definir et Adopter du guide de mise en place des 11/16/201 Observatoires de la 40,000 QC Post 12/01/2015 20,000,000 5 Demographie, Conduite des Enquetes et Collecte des 4 Donnees Recrutement d’un secretaire 12/19/201 pour la coordination du Fonds 12,000 CI Post 01/03/2016 6,000,000 5 5 Commun Recrutement d’un chauffeur 12/19/201 pour la coordination du Fonds 12,000 CI Post 01/03/2016 6,000,000 5 6 Commun Recrutement d’un Assistant au Specialiste en Passation 12/19/201 20,400 CI à priori 01/03/2016 des Marchés du Fonds 10,200,000 5 7 Commun Recrutement d’un consultant chargé de réaliser l'inventaire des immobilisations acquises 12/19/201 dans le cadre du Fonds 150,000 SFQC Post 01/03/2016 75,000,000 5 Commun et d'actualisation de la base des données 8 comptable du Fonds Commun. Recrutement d'un bureau d'études pour les études architecturales, techniques ,le 12/19/201 suivi et contrôle des travaux 120,000 SFQC Post 01/03/2016 60,000,000 5 des chantiers de transformation des cases de 9 santé en CSI Recrutement d'un cabinet national pour réaliser une 12/19/201 60,000 Post 01/03/2016 enquête CAP sur la 30,000,000 5 10 vaccination QC Recrutement d’un consultant pour réaliser une étude sur les determinants de la faible 12/19/201 120,000 Post 01/03/2016 couverture vaccinale dans les 60,000,000 5 dix districts les moins 11 performant SFQC Recrutement d’un cabinet 09/18/201 pour verifier les resultats 200,000 Post 10/03/2015 100,000,000 5 12 fournis par le MSP SFQC Recrutement d'ONG dans le cadre de l'accompagnement 11/03/201 des adolescentes en matiere 500,000 à priori 11/18/2015 250,000,000 5 de santé maternelle et de la 13 reproduction SFQC Recrutement d'un consultant 09/05/201 pour realiser l'etude sur le 160,000 Post 09/20/2015 80,000,000 5 14 secteur privé de la Santé SFQC Recrutement d'un consultant 09/05/201 pour realiser l'etude sur le 160,000 Post 09/20/2015 80,000,000 5 15 secteur pharmacetique SFQC Recrutement d'un consultant 09/05/201 pour realiser l'enquete 1,000,000 à priori 09/20/2015 500,000,000 5 16 Démographique pour le Niger Entete Directe Recrutement d'une agence 09/05/201 pour la campagne de Mass 960,000 à priori 09/20/2015 480,000,000 5 17 Media SFQC Recrutement d'un specialiste 09/05/201 20,000 à priori 09/20/2015 18 en communication 10,000,000 CI 5 Recrutement d'un specialiste 09/05/201 20,000 à priori 09/20/2015 19 en Suivi Evaluation 10,000,000 CI 5 Recrutement d'un deuxieme Assistant Comptable au 09/05/201 14,400 à priori 09/20/2015 Comptable Principal du Fonds 7,200,000 5 20 Commun CI Recrutement d'un Assistant 09/05/201 au Controleur Interne du 19,200 à priori 09/20/2015 9,600,000 5 21 Fonds Commun CI Recrutement d'un Assistant Technique en Communication 09/05/201 28,000 à priori 09/20/2015 pour le Changement de 14,000,000 5 22 Comportement CI Recrutement d'un Assistant 09/05/201 28,000 à priori 09/20/2015 23 Technique en Nutrition 14,000,000 CI 5 Recrutement d'un Assistant 09/05/201 28,000 à priori 09/20/2015 Technique en Demographie 14,000,000 5 24 CI Recrutement d'un Cabinet d' 09/05/201 300,000 Post (1) 09/20/2015 25 Audit Comptable 150,000,000 SFQC 5 Recrutement d'une Agence de 09/05/201 600,000 à priori 09/20/2015 26 verification des indicateurs 300,000,000 SFQC 5 Recrutement d'un Cabinet 09/05/201 1,000,000 à priori 09/20/2015 27 pour realiser l'Enquete EDS 500,000,000 SFQC 5 Recrutement d'un Cabinet 09/05/201 pour realiser l'Enquete SDI : 300,000 Post 09/20/2015 150,000,000 5 28 Delivrance des Services SFQC Recrutement d'un consultant 09/05/201 pour l'evaluation à mi 100,000 Post 09/20/2015 50,000,000 5 29 parcours du projet SFQC Recrutement d'un ONG pour 09/05/201 270,000 Post 09/20/2015 30 l'Ecole des Maris 135,000,000 SFQC 5 Recrutement d'un ONG pour 12/06/201 4,400,000 2,200,000,0 à priori 12/21/2015 les filles Adolecentes 5 31 00 SFQC Recrutement d'un ONG pour 12/06/201 72,000 Post 12/21/2015 32 les learders Communautaires 36,000,000 SFQC 5 5,417,000,0 10,834,000 Coût Total Services 00 (1) Les TDR et la liste restreinte doivent être revus préalablement par la banque. Les autres piéces du processus doivent être archivés pour revue á postériori de la banque Ligne (16)Contrat direct avec l' INSTITUT NATIONAL DE LA STATISTIQUE PROCUREMENT Niger : Population and Health Support Project PLAN General Information Country: Niger Bank’s Approval Date of the Original Procurement Plan: 2017-09-27 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147638 GPN Date: 2017-08-04 Project Name: Population and Health Support Project Loan / Credit No: IDA / 56440, IDA / D0620 P Executing Agency(ies): rojet d’Appui à la Population et à la Santé WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NE-PAPS-31781-GO-RFB / Improving capacity to Distribuer des kits scolaires manage, coordinate, monitor Single Stage - One aux 7400 filles bénéficiaires IDA / 56440 Post Request for Bids Open - National 291,769.00 235,409.35 Signed 2017-12-21 2018-01-18 2017-12-26 2018-01-19 2018-02-06 2018-01-25 2018-03-08 2018-04-09 2018-04-12 2018-05-08 2018-10-09 and evaluate RHN services Envelope du cash transfert (Filets and demand-side activities Sociaux) NE-PAPS-31785-GO-RFQ / Improving capacity to Confectionner des livrets et manage, coordinate, monitor Request for Single Stage - One registres pour les paiements IDA / 56440 Post Open - National 22,500.00 17,978.03 Completed 2017-11-08 2018-02-02 2018-01-03 2018-02-19 2018-07-02 2018-02-26 and evaluate RHN services Quotations Envelope des 7400 filles bénéficiaires and demand-side activities du cash transfert NE-PAPS-31787-GO-RFQ / Improving capacity to Achat Motos pour les manage, coordinate, monitor Request for Single Stage - One Responsables IDA / 56440 Post Open - National 24,000.00 19,029.40 Completed 2017-11-17 2018-01-12 2018-02-19 2018-07-11 2018-02-26 and evaluate RHN services Quotations Envelope Accompagnement and demand-side activities Communaux NE-PAPS-31788-GO-RFQ / Improving capacity to Achat ordinateurs portables manage, coordinate, monitor Request for Single Stage - One pour les Responsables IDA / 56440 Post Open - National 22,400.00 20,923.97 Completed 2017-11-17 2018-01-12 2018-02-12 2018-07-11 2018-02-26 and evaluate RHN services Quotations Envelope Accompagnement and demand-side activities Communautaires NE-PAPS-31782-GO-RFB / Improving capacity to Distribuer des kits d'hygiène manage, coordinate, monitor Single Stage - One IDA / 56440 Post Request for Bids Open - National 149,160.00 141,801.39 Signed 2017-12-20 2017-12-28 2017-12-25 2017-12-28 2018-02-05 2018-01-25 2018-03-07 2018-02-26 2018-04-11 2018-04-09 2018-10-08 aux 2200 filles bénéficiaires and evaluate RHN services Envelope du cash transfert and demand-side activities 003/2017/FOURN/MSP/FC- PDS / Achat de contraceptifs Increasing the demand of IDA / D0620 Prior Direct Selection Direct 400,000.00 406,569.03 Signed 2017-10-11 2018-01-09 2017-10-21 2018-01-31 2017-11-15 2018-05-04 2017-11-25 injectables sous cutanés pour RHN services la DSME avec l'UNFPA 007/2017/FOURN/MSP/FC- PDS / Achat de produits et Contingent Emergency consommables pour les IDA / D0620 Prior Direct Selection Direct 2,000,000.00 258,336.47 Signed 2017-12-15 2017-12-21 2017-12-30 2018-02-01 2018-02-07 2018-11-27 2018-02-17 Response prestations des services PF avec l'UNFPA NE-PAPS-31657-GO-RFQ / Improving capacity to Achat de matériels manage, coordinate, monitor Request for Single Stage - One informatiques de IDA / 56440 Post Open - National 30,000.00 28,405.98 Completed 2017-12-31 2018-02-25 2018-02-15 2018-08-24 2018-02-15 and evaluate RHN services Quotations Envelope reprographie et fournitures de and demand-side activities bureau pour le MPFPE NE-PAPS-31659-GO-RFB / Improving capacity to Achat de deux (2) véhicules manage, coordinate, monitor Single Stage - One IDA / 56440 Post Request for Bids Open - National 120,000.00 97,967.49 Completed 2017-10-25 2018-01-02 2017-11-29 2018-01-29 2018-01-08 2018-03-09 2018-01-23 2018-04-16 2018-02-27 2018-06-06 2018-08-26 2018-10-31 Toyota station wagon and evaluate RHN services Envelope supervision pour le MPF and demand-side activities NE-PAPS-31792-GO-RFB / Improving capacity to Distribuer des kits scolaires manage, coordinate, monitor Single Stage - One IDA / 56440 Post Request for Bids Open - National 240,720.00 0.00 Canceled 2017-10-26 2017-10-31 2017-12-12 2018-01-11 2018-02-15 2018-08-14 aux filles bénéficiaires du and evaluate RHN services Envelope cash transfert and demand-side activities 004/2017/FOURN/MSP/FC- PDS / Achat de misoprostol en entente directe avec UNFPA, Contingent Emergency IDA / D0620 Post Direct Selection Direct 400,000.00 413,311.92 Completed 2018-01-30 2018-01-23 2018-02-09 2018-01-23 2018-03-31 2018-03-16 2018-09-27 2019-04-04 pour la prise en charge des Response hémorragies du post partum et soins après avortement. 006/2017/FOURN/MSP/FC- PDS / Achat de chlorexidène Contingent Emergency IDA / D0620 Post Direct Selection Direct 52,900.00 42,782.25 Completed 2018-01-30 2018-01-23 2018-02-09 2018-01-23 2018-03-31 2018-03-16 2018-09-27 2019-04-04 gel en entente directe avec Response UNFPA pour la DSME 0010/2017/FOURN/MSP/FC- Improving capacity to PDS / Acquérir 4 pinasses manage, coordinate, monitor Request for Single Stage - One IDA / D0620 Post Open - National 24,000.00 18,709.71 Completed 2018-02-19 2018-01-24 2018-04-08 2018-02-20 2018-04-18 2018-04-03 pour les CSI insulaires du and evaluate RHN services Quotations Envelope District de Tillaberi and demand-side activities NE-PAPS-42740-GO-RFQ / Doter la Direction de la Nutrition en 5 ordinateurs Improving capacity to portables, 5 ordinateurs de manage, coordinate, monitor Request for Single Stage - One IDA / D0620 Post Open - National 19,382.00 17,023.68 Completed 2018-02-27 2018-05-05 2018-04-19 2018-06-23 2018-04-29 2018-08-09 bureaux, 4 imprimantes, 2 and evaluate RHN services Quotations Envelope datashow et 1 photocopieur and demand-side activities de grande performancepour 2018 013/2017/FOURN/MSP/FC- Improving capacity to PDS / Acquéri un logiciel de manage, coordinate, monitor Request for Single Stage - One IDA / 56440 Post Open - National 10,000.00 0.00 Canceled 2017-09-03 2017-10-03 2017-10-13 gestion des évacuations and evaluate RHN services Quotations Envelope sanitaires pour le MSP and demand-side activities Page 1 011/2017/FOURN/MSP/FC- PDS / Acquérir des outils de Improving capacity to gestion du FC pour les manage, coordinate, monitor Request for Single Stage - One IDA / 56440 Post Open - National 24,000.00 0.00 Canceled 2017-07-24 2017-08-16 2017-08-26 niveaux central et régional and evaluate RHN services Quotations Envelope (demande d'achat, bons de and demand-side activities commandes) 012/2017/FOURN/MSP/FC- Improving capacity to PDS / Acquérir 3 logiciels manage, coordinate, monitor TOMPRO pour la DRFM, IDA / 56440 Post Direct Selection Direct 40,000.00 0.00 Canceled 2017-08-28 2017-09-02 2017-10-07 2017-10-27 and evaluate RHN services Comptabilité et Division and demand-side activities Mobiliers de bureau 16/2018/MEP/A-GO-RFB / Improving the provision of Acquisition et mise en place Single Stage - One IDA / 56440 high quality RHN services Post Request for Bids Open - National 149,800.00 106,733.83 Completed 2018-05-21 2018-05-28 2018-06-20 2018-07-14 2018-08-05 2018-07-26 2018-09-19 2018-10-03 2018-10-30 2019-01-03 2019-04-28 2019-04-09 de 1070 vélos pour les filles Envelope (DLI-based financing) les plus méritantes 01/CFS/2018/FOURN / Improving capacity to Fourniture de 7400 kits manage, coordinate, monitor Single Stage - One IDA / 56440 Post Request for Bids Open - National 162,720.00 133,982.55 Signed 2018-11-15 2018-11-22 2018-11-20 2018-11-23 2019-01-01 2019-01-31 2019-01-31 2019-02-06 2019-03-07 2019-03-25 2019-09-03 d'hygiène aux filles and evaluate RHN services Envelope bénéficiaires du cash transfert and demand-side activities 04/CFS/2018/FOURN / Improving capacity to Fourniture de seize (16) manage, coordinate, monitor Single Stage - One IDA / 56440 Post Request for Bids Open - National 25,600.00 20,147.89 Signed 2018-10-04 2019-04-02 2018-10-19 2019-04-02 2018-12-08 2019-05-02 2019-01-12 2020-01-22 2019-02-22 2019-06-25 2019-08-21 motos aux Agents de Terrain and evaluate RHN services Envelope du Projet Scofi and demand-side activities 29/CFS/2019/FOURN / Kits Improving capacity to scolaires 219 Achat et manage, coordinate, monitor Single Stage - One Distribuer des kits scolaires IDA / 56440 Post Request for Bids Open - National 120,000.00 79,588.19 Completed 2019-05-30 2019-10-24 2019-06-14 2019-10-24 2019-08-03 2019-11-26 2019-09-02 2020-01-23 2019-10-07 2020-02-07 2020-04-04 2020-02-28 and evaluate RHN services Envelope aux filles bénéficiaires du and demand-side activities cash transfert CFS/2019/FOURN/29 / Kits Improving capacity to hygiène 2019 Acheter et manage, coordinate, monitor Single Stage - One Distribuer des kits d'hygiène IDA / 56440 Post Request for Bids Open - National 339,000.00 79,588.19 Completed 2019-05-30 2019-10-25 2019-06-14 2019-10-25 2019-08-13 2019-11-26 2019-09-12 2020-01-22 2019-11-02 2020-02-07 2020-04-30 2020-03-31 and evaluate RHN services Envelope aux filles bénéficiaires du and demand-side activities cash transfert PAA 2.2.20 27/MEN/2019 / 1070 Vélos 2019: Acquisition et mise en Improving the provision of Single Stage - One place de 1070 vélos pour les IDA / 56440 high quality RHN services Post Request for Bids Open - National 149,800.00 0.00 Canceled 2019-04-15 2019-05-15 2019-06-30 2019-08-14 2019-09-24 2020-03-22 Envelope filles les plus méritantes de (DLI-based financing) 2019 31/2019/FOURN/DEP/MSP / 2 Veh RRI Achat de 2 véhicules PU DC 4x4 pour les Improving capacity to Coachs Appui pour la mise en manage, coordinate, monitor Single Stage - One IDA / 56440 Post Request for Bids Open - National 160,000.00 73,277.16 Signed 2019-05-30 2019-05-08 2019-07-04 2019-05-16 2019-08-13 2019-09-06 2019-09-07 2019-11-11 2019-10-12 2019-11-27 2020-04-09 œuvre du Projet d'Appui à la and evaluate RHN services Envelope Population et à la Santé selon and demand-side activities l'approche par résultat rapide (ARR/RRI) Taoua et Zinder 03/2020/DSME/MSP / Acquisition de chlorhexidine Contingent Emergency Request for Single Stage - One gel pour les régions pour les IDA / D0620 Post Limited 18,182.00 17,330.13 Completed 2020-06-25 2020-06-25 2020-08-20 2020-06-25 2020-08-30 2020-07-15 Response Quotations Envelope soins ombilicaux du nouveau né PAA DSME 2,1,14 01/2020/MPF/PE/PAPS / Acquisition des équipements Improving the provision of Request for Single Stage - One pour les centres multimédias IDA / 56440 high quality RHN services Post Limited 45,455.00 43,211.76 Completed 2020-07-15 2020-06-03 2020-09-21 2020-06-22 2020-12-20 2020-07-15 Quotations Envelope des femmes des cinq (5) (DLI-based financing) régions de PAPS 2.1.3 MPF 09/2020/CFS/PAPS / Improving capacity to Acquisition et Distribution des manage, coordinate, monitor Single Stage - One kits d’hygiène au profit des IDA / 56440 Post Request for Bids Open - National 272,455.00 154,118.72 Completed 2020-09-15 2020-07-15 2020-09-30 2020-07-15 2020-11-29 2020-07-30 2020-12-29 2020-10-28 2021-02-18 2020-10-20 2021-08-17 2021-03-02 and evaluate RHN services Envelope filles bénéficiaires du cash and demand-side activities transfert 2.2.12 CFS/15000 04/2020/DSME/MSP/PAPS / Acquisition de 2 millions de Contingent Emergency Single Stage - One IDA / D0620 Post Request for Bids Open - National 363,636.00 0.00 Canceled 2020-07-15 2020-08-27 2020-07-30 2020-06-10 2020-09-10 2020-07-14 2020-10-10 2020-10-09 2020-11-23 2021-03-23 comprimés de misoprostoles Response Envelope DSME 2.1.15 07/2020/MPF/PE/PAPS / Acquisition des kits de transformation des produits Improving the provision of Single Stage - One agro-sylvo-pastoraux au IDA / D0620 high quality RHN services Prior Request for Bids Open - International 2,181,818.00 1,774,967.54 Signed 2020-08-17 2020-08-13 2020-09-01 2020-08-21 2020-10-16 2020-10-13 2020-11-25 2020-12-22 2021-01-24 2021-01-20 2021-07-23 Envelope profit des femmes et les (DLI-based financing) jeunes filles formées PAA 2.2.1 MPF 10/2020/UGP/MSP/PAPS / Improving capacity to Acquisition de 3 véhicules de manage, coordinate, monitor Single Stage - One supervision au profit de la IDA / 56440 Post Request for Bids Open - National 245,455.00 203,815.21 Completed 2020-06-30 2020-05-26 2020-08-04 2020-06-10 2020-09-13 2020-07-14 2020-10-08 2020-09-22 2020-11-12 2020-11-11 2021-05-11 2020-12-07 and evaluate RHN services Envelope DSME 2 et la DOS 1 PAA 3.9 and demand-side activities UGP 08/2020/CFS/PAPS / Improving capacity to Acquisition et Distribution des manage, coordinate, monitor Single Stage - One kits scolaires aux filles IDA / 56440 Post Request for Bids Open - National 129,818.00 61,200.26 Signed 2020-09-15 2020-07-15 2020-10-10 2020-07-15 2020-11-29 2020-07-30 2020-12-29 2020-10-28 2021-02-11 2020-10-20 2021-08-10 and evaluate RHN services Envelope bénéficiaires du cash transfert and demand-side activities 2.2.11 CFS/ 4000 06/2020/DOS/MSP/PAPS / Acquisition des sacs porte- Improving the provision of Request for Single Stage - One documents pour les 2 591 IDA / D0620 high quality RHN services Post Open - National 94,182.00 34,858.64 Signed 2020-08-14 2020-12-31 2020-11-27 2021-04-08 2021-02-25 Quotations Envelope relais communautaires PAA (DLI-based financing) 2.1.25 DOS 12/2020/FOURN/MSP/DSME / Acquisition de 2 millions de Contingent Emergency IDA / D0620 Post Direct Selection Direct 363,636.00 310,865.13 Signed 2020-11-30 2020-11-17 2020-12-30 2020-11-17 2021-02-28 2020-12-24 2021-08-27 comprimés de misoprostoles Response pour la DSME 14/2021/FOURN/MSP/PAPS / Improving capacity to Pending Acquérir du matériel manage, coordinate, monitor Request for Single Stage - One IDA / 56440 Post Limited 10,049.00 0.00 Implementati 2021-04-01 2021-06-14 2021-07-14 informatique et bureautique and evaluate RHN services Quotations Envelope on pour le Fonds Commun and demand-side activities Page 2 16/2021/MSP/PAPS/PFS / Acquisition et Distribution des kits d’hygiène au profit des 3 Improving capacity to Under 700 filles bénéficiaires du manage, coordinate, monitor Single Stage - One IDA / 56440 Post Request for Bids Open - National 228,055.00 148,523.92 Implementati 2021-05-28 2021-03-09 2021-06-22 2021-03-09 2021-08-21 2021-04-13 2021-09-20 2021-05-19 2021-11-10 2022-02-08 cash transfert des Régions de and evaluate RHN services Envelope on Maradi , Zinder, Tahoua, and demand-side activities Tillabéry, Dosso pour l'année 2021 15/2021/MSP/PAPS/PFS / Acquisition et Distribution des Improving capacity to kits scolaires aux 4 000 filles Pending manage, coordinate, monitor Request for Single Stage - One bénéficiaires du cash transfert IDA / 56440 Post Open - National 64,909.00 0.00 Implementati 2021-04-04 2021-06-13 2021-09-11 and evaluate RHN services Quotations Envelope des Régions de Maradi , on and demand-side activities Zinder, Tahoua, Tillabéry, Dosso année 2021 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Improving capacity to 03/CFS/2018/SCE / manage, coordinate, monitor Request for Single Stage - One Reprographie des Pagivoltes IDA / 56440 Post Limited 20,000.00 14,928.97 Completed 2018-11-30 2018-12-12 2019-01-25 2018-12-12 2019-02-14 2018-12-12 and evaluate RHN services Quotations Envelope pour 707 relais et 648 AME and demand-side activities 14/2017/FC/PDS / Improving capacity to Reprographie manuel des manage, coordinate, monitor Request for Single Stage - One procédures administratives, IDA / D0620 Post Limited 20,000.00 17,503.51 Completed 2019-03-10 2019-01-21 2019-05-05 2019-01-24 2019-06-04 2019-02-05 and evaluate RHN services Quotations Envelope financières, et comptables du and demand-side activities FC 17/2018/DSME/MSP-GO-RFB Improving the provision of Single Stage - One / Reproduction supports de IDA / 56440 high quality RHN services Post Request for Bids Open - National 120,000.00 31,571.78 Completed 2018-12-31 2019-12-23 2019-01-10 2019-12-24 2019-03-01 2020-01-28 2019-03-31 2020-03-05 2019-05-21 2020-10-12 2019-08-19 2020-11-05 Envelope communication pour la DSME (DLI-based financing) 02/CFS/2018/SC / Improving capacity to Reproduction des livrets et manage, coordinate, monitor Request for Single Stage - One registres pour les paiements IDA / 56440 Post Limited 34,800.00 15,006.03 Completed 2018-11-25 2018-12-12 2019-01-20 2018-12-12 2019-03-21 2018-12-04 and evaluate RHN services Quotations Envelope des 7700 filles bénéficiaires and demand-side activities du cash transfert 70/MSP/FC/2019/FOURN / Improving capacity to 1000 Affiches Confectionner manage, coordinate, monitor Request for Single Stage - One et reproduire 1000 affiches IDA / 56440 Post Limited 15,000.00 0.00 Canceled 2019-07-10 2019-09-13 2019-10-13 and evaluate RHN services Quotations Envelope A2 sur le genre et santé de la and demand-side activities reproduction CFS/2019/30 / Livrets 2019 Improving capacity to Confectionner des livrets et manage, coordinate, monitor Request for Single Stage - One IDA / 56440 Post Limited 16,000.00 13,539.38 Completed 2019-06-14 2019-11-27 2019-08-21 2019-12-17 2019-10-20 2019-12-27 registres des bénéficiaires and evaluate RHN services Quotations Envelope (nouvelle cohorte) PAA 2.2.17 and demand-side activities 05/2020/DOS/MSP / Improving the provision of Reproduction des supports de Single Stage - One IDA / 56440 high quality RHN services Post Request for Bids Open - National 416,915.00 182,022.30 Signed 2020-06-22 2020-11-11 2020-07-12 2020-11-11 2020-08-31 2020-12-17 2020-09-30 2020-12-31 2020-11-20 2021-02-19 2021-02-18 communication pour les relais Envelope (DLI-based financing) DOS 2.1.20 Improving capacity to 11/2020/DEP/MSP/PAPS / manage, coordinate, monitor Request for Single Stage - One Reproduction du guide RRI IDA / D0620 Post Limited 18,182.00 17,657.64 Completed 2020-07-16 2020-12-07 2020-09-26 2020-12-08 2020-10-26 2020-12-17 and evaluate RHN services Quotations Envelope revisé PAA DEP 3.15 and demand-side activities 21B/2019/FOURN/MSP/DSME Improving the provision of / Reproduction des supports Single Stage - One IDA / 56440 high quality RHN services Post Request for Bids Open - National 120,000.00 28,059.51 Signed 2020-11-30 2020-09-30 2020-12-10 2020-11-17 2021-01-29 2020-11-17 2021-02-28 2020-11-17 2021-04-20 2020-10-12 2021-07-19 de communication SR/PF Envelope (DLI-based financing) pour la DSME 13/2021/FOURN/MSP/PAPS / Reproduire les cartes conseils Improving the provision of Pending Request for Single Stage - One élaborés sur les recettes IDA / 56440 high quality RHN services Post Limited 20,364.00 0.00 Implementati 2021-07-05 2021-08-23 2021-10-22 Quotations Envelope culinaires pour l'alimentation (DLI-based financing) on de l'enfants 02/2020/DSME/MSP/PAPS / Improving capacity to Reproduction de la stratégie manage, coordinate, monitor Request for Single Stage - One IDA / D0620 Post Limited 10,818.00 0.00 Canceled 2020-07-25 2020-09-19 2020-10-19 IEC/SR version finalisée PAA and evaluate RHN services Quotations Envelope DSME 2.1.10 and demand-side activities CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NE-PAPS-31662-CS-QCBS / Recrutement d'un Cabinet Improving capacity to pour la passation des marchés manage, coordinate, monitor Quality And Cost- IDA / 56440 Post Open - International 120,000.00 50,921.14 Completed 2017-11-29 2017-11-28 2017-12-29 2018-01-17 2018-02-11 2018-05-01 2018-03-11 2018-07-23 2018-04-10 2018-08-06 2018-05-15 2018-09-14 2018-06-19 2018-11-14 2019-06-19 2019-03-05 et le renforcement de and evaluate RHN services Based Selection capacités des cadres du and demand-side activities MPF/EF NE-PAPS-31668-CS-CQS / Recrutement Cabinet pour Consultant Increasing the demand of élaborer le module de IDA / 56440 Post Qualification Open - National 120,000.00 0.00 Canceled 2017-11-28 2017-12-19 2018-02-01 2018-03-03 2018-04-07 2018-10-04 RHN services formation des enseignements Selection AME et PF/Scofi pour le MPF NE-PAPS-31667-CS-QBS / Recrutement Cabinet pour Consultant Increasing the demand of réviser la politique nationale IDA / 56440 Post Qualification Open - National 50,000.00 0.00 Canceled 2017-12-15 2018-01-02 2018-01-05 2018-01-24 2018-02-18 2018-03-20 2018-04-24 2018-10-21 RHN services de l'éducation et la formation Selection des filles pour le MPF Improving capacity to 04/2017/SERV/MSP/FC-PDS manage, coordinate, monitor Quality And Cost- / Réalisation d'une étude sur IDA / D0620 Post Open - International 160,000.00 92,086.01 Completed 2017-12-20 2017-12-23 2018-01-10 2018-01-18 2018-02-23 2018-04-20 2018-03-23 2018-07-25 2018-04-22 2018-07-30 2018-05-27 2018-11-28 2018-07-01 2019-02-06 2018-09-29 2020-07-15 and evaluate RHN services Based Selection le secteur privé de la santé and demand-side activities Page 3 01/2017/SERV/MSP/FC-PDS / Recrutement d'un consultant Consultant Increasing the demand of pour l'élaboration de la IDA / D0620 Post Qualification Open - National 40,000.00 61,181.20 Terminated 2017-12-27 2017-12-23 2018-01-17 2018-01-18 2018-03-02 2018-06-28 2018-04-01 2018-09-27 2018-05-06 2018-12-05 2018-08-04 RHN services stratégie d'utilisation des Selection relais communautaires Improving capacity to 025/2017/SERV/MSP/FC-PDS Consultant manage, coordinate, monitor / Recrutement Cabinet pour IDA / D0620 Post Qualification Open - National 60,000.00 0.00 Canceled 2017-12-21 2017-12-23 2018-01-11 2018-01-23 2018-02-24 2018-05-08 2018-03-26 2018-12-05 2018-04-30 2018-10-27 and evaluate RHN services enquête LQAS Selection and demand-side activities NE-PAPS-31663-CS-CQS / Recrutement d'une ONG ou Increasing the demand of Quality And Cost- dune Association pour la mise IDA / 56440 Post Open - International 300,000.00 0.00 Canceled 2018-02-20 2018-03-27 2018-05-16 2018-06-13 2018-07-13 2018-08-17 2018-09-21 2019-09-21 RHN services Based Selection en œuvre des activités du CCSC NE-PAPS-31673-CS-CQS / Recrutement d'une ONG ou d'une Association pour la Increasing the demand of Quality And Cost- IDA / 56440 Post Open - International 992,000.00 0.00 Canceled 2018-02-20 2018-03-27 2018-05-16 2018-06-13 2018-07-13 2018-08-17 2018-09-21 2019-09-21 formation des adolescentes RHN services Based Selection des espaces sûrs en alphabétisation pour le MPF NE-PAPS-37764-MPFPE / Contractualisation avec une Improving capacity to ONG ou une Association pour manage, coordinate, monitor Quality And Cost- la formation en SR, Santé, IDA / 56440 Post Open - International 300,000.00 0.00 Canceled 2018-02-20 2018-02-26 2018-04-16 2018-06-05 2018-07-03 2018-08-02 2018-09-29 2018-12-01 2019-12-01 and evaluate RHN services Based Selection Nutrition, Hygiène, Estime de and demand-side activities soi et gestion financière pour les adolescentes 29/2018/MPF-CS-QCB / Recrutement d'un cabinet pour l'élaboration des Consultant Increasing the demand of modules de sensibilisation sur IDA / 56440 Post Qualification Open - National 40,000.00 0.00 Canceled 2018-07-30 2018-08-29 2018-10-28 2018-11-27 2019-01-01 2019-04-01 RHN services la SR/PF pour le dialogue Selection communautaire (espaces sûres) 30/2018/MPF-CS-QCB / Réalisation d'un audit Improving capacity to organisationnel et Consultant manage, coordinate, monitor institutionnel du Ministère de IDA / 56440 Post Qualification Open - National 80,000.00 65,747.61 Completed 2018-07-16 2018-11-22 2018-08-25 2018-11-22 2018-10-08 2019-03-25 2018-11-07 2019-03-25 2018-12-28 2019-05-02 2019-04-27 2019-09-09 and evaluate RHN services la Promotion de la Femme et Selection and demand-side activities de la Protection de l'Enfant MPF/PE 31/2018/MPF-CS-CDS / Réalisation d'une étude sur la Increasing the demand of Quality And Cost- contribution des femmes à IDA / 56440 Post Open - International 200,000.00 0.00 Canceled 2018-07-16 2019-06-01 2018-08-25 2018-10-14 2018-11-28 2018-12-28 2019-02-26 2019-04-07 2019-10-04 RHN services Based Selection l'économie domestique et de marché NE-PAPS-31669-CS-CQS / Recrutement Cabinet pour la Consultant Increasing the demand of révision élaboration et IDA / 56440 Post Qualification Open - National 68,956.00 0.00 Canceled 2017-12-15 2018-01-05 2018-02-18 2018-03-20 2018-04-24 2018-10-21 RHN services validation de la stratégie Selection IEC/SR pour le MPF 39/2018/MPO / Audit organ MPo Recrutement d'un Improving capacity to Consultant Consultant pour la réalisation manage, coordinate, monitor IDA / 56440 Post Qualification Open - National 80,000.00 67,672.00 Completed 2018-12-30 2019-01-16 2019-02-08 2019-02-06 2019-04-14 2019-08-19 2019-06-13 2019-11-18 2019-08-03 2019-12-02 2019-12-01 2020-12-30 d'un Audit organisationnel et and evaluate RHN services Selection institutionnel du Ministère de and demand-side activities la Population 40/2018/MPF/MSP / CCSC MPF Recrutement d'une ONG Increasing the demand of Quality And Cost- /Associations mise en œuvre IDA / 56440 Post Open - International 500,000.00 0.00 Canceled 2019-02-28 2019-06-21 2019-04-14 2019-07-03 2019-08-10 2019-09-09 2019-11-19 2020-01-29 2021-01-28 RHN services Based Selection des activités de CCSC sur la SR/N/PF 42/CFS/2019/SCE / Agence TAHOUA Recrutement d'une agence de paiement des Improving capacity to bourses scolaires des filles Consultant manage, coordinate, monitor bénéficiaires du Cash IDA / D0620 Post Qualification Open - National 10,540.80 0.00 Canceled 2019-05-30 2019-04-03 2019-06-20 2019-04-09 2019-09-18 2019-10-28 2019-12-18 2020-12-12 and evaluate RHN services Transfert pour la Région de Selection and demand-side activities Tahoua dans le cadre de la mise en œuvre des sous- composantes 2.1 43/CFS/2019/SCE / Agence MARADI Recrutement d'une agence de paiement des Improving capacity to bourses scolaires des filles Consultant manage, coordinate, monitor bénéficiaires du Cash IDA / D0620 Post Qualification Open - National 10,540.80 0.00 Canceled 2019-05-30 2019-04-03 2019-06-20 2019-04-09 2019-09-18 2019-10-28 2019-12-18 2020-12-12 and evaluate RHN services Transfert pour la Région de Selection and demand-side activities Maradi dans le cadre de la mise en œuvre des sous- composantes 2.1 44/CFS/2019/SCE / Agence ZINDER Recrutement d'une agence de paiement des Improving capacity to bourses scolaires des filles Consultant manage, coordinate, monitor bénéficiaires du Cash IDA / D0620 Post Qualification Open - National 10,540.80 0.00 Canceled 2019-05-30 2019-04-03 2019-06-20 2019-04-09 2019-09-18 2019-10-28 2019-12-18 2020-12-12 and evaluate RHN services Transfert pour la Région Selection and demand-side activities Zinder dans le cadre de la mise en œuvre des sous- composantes 2.1 45/CFS/2019/SCE / Agence TILLABERY Recrutement d'une agence de paiement des Improving capacity to bourses scolaires des filles Consultant manage, coordinate, monitor bénéficiaires du Cash IDA / D0620 Post Qualification Open - National 10,540.80 0.00 Canceled 2019-05-30 2019-04-03 2019-06-20 2019-04-09 2019-09-18 2019-10-28 2019-12-18 2020-12-12 and evaluate RHN services Transfert pour la Région de Selection and demand-side activities Tillabery dans le cadre de la mise en œuvre des sous- composantes 2.1 Page 4 41/CFS/2019/SCE / Agence DOSSO Recrutement d'une agence de paiement des Improving capacity to bourses scolaires des filles Consultant manage, coordinate, monitor bénéficiaires du Cash IDA / D0620 Post Qualification Open - National 10,540.80 0.00 Canceled 2019-05-30 2019-04-03 2019-06-20 2019-04-09 2019-09-18 2019-10-28 2019-12-18 2020-12-12 and evaluate RHN services Transfert pour la Région de Selection and demand-side activities Dosso dans le cadre de la mise en œuvre des sous- composantes 2.1 MPF-PAPS-67944-CS-QCBS / Recrutement ONG/Associations pour formation en SR, santé et nutrition, hygiène, estime de Increasing the demand of Quality And Cost- IDA / 56440 Post Open - International 1,500,000.00 0.00 Canceled 2018-07-20 2018-07-16 2018-08-29 2018-11-02 2018-12-17 2019-01-16 2019-03-17 2019-05-06 2020-05-05 soi et gestion financière, RHN services Based Selection alphabétisation fonctionnelle, renforcement des capacités des formateurs pour les adolescentes 03/2017/SERV/MSP/FC-PDS Improving capacity to / Vérification des résultats manage, coordinate, monitor Quality And Cost- IDA / D0620 Post Open - International 200,000.00 0.00 Canceled 2017-12-05 2017-12-23 2017-12-26 2018-01-19 2018-02-08 2018-04-20 2018-03-08 2018-07-25 2018-04-07 2018-07-28 2018-05-12 2018-11-28 2018-06-16 2018-09-14 fournis par le MSP and evaluate RHN services Based Selection (Vérificateur interne) and demand-side activities 53/2019/SERV/MPS/DS / Vérificateur externe DS Improving capacity to Recrutement d’un manage, coordinate, monitor Quality And Cost- IDA / D0620 Post Open - International 500,000.00 0.00 Canceled 2019-08-30 2019-07-26 2019-10-29 2019-07-31 2020-01-17 2019-12-26 2020-03-17 2020-04-16 2020-06-05 2020-06-23 2022-06-23 Vérificateur externe pour and evaluate RHN services Based Selection vérifier les résultats fournis and demand-side activities par le MSP (DS) 53/2019/CFS/SCE / Cabine Improving capacity to CFS RECRUTEMENT D'UN Consultant manage, coordinate, monitor CABINET POUR PROCÉDER AU IDA / D0620 Post Qualification Open - National 30,000.00 25,154.10 Signed 2019-09-30 2019-10-24 2019-10-03 2019-10-31 2019-11-16 2020-03-03 2019-12-16 2020-03-09 2020-01-20 2020-01-23 2020-07-18 and evaluate RHN services RECRUTEMENT DES 79 Selection and demand-side activities AGENTS DE TERRAIN 62/2020/MSP/PAPS / Improving capacity to Recrutement d’un Vérificateur Consultant manage, coordinate, monitor externe pour vérifier les IDA / D0620 Post Qualification Open - International 272,727.00 246,829.80 Signed 2020-03-16 2020-03-09 2020-04-25 2020-10-31 2020-05-28 2021-02-04 2020-06-27 2021-04-07 2020-08-01 2021-04-08 2020-08-01 and evaluate RHN services résultats fournis par le MSP Selection and demand-side activities (DS) année 2020 03/2020/CONS/MSP/PAPS / Recrutement d'un cabinet Improving capacity to pour l'audit externe des manage, coordinate, monitor Quality And Cost- Under IDA / 56440 Post Open - National 36,363.60 0.00 2020-06-15 2020-05-26 2020-07-06 2020-05-27 2020-08-19 2020-10-08 2020-09-16 2020-12-15 2020-10-16 2021-04-20 2020-12-06 2021-02-04 2023-06-24 comptes FC et PAPS pour les and evaluate RHN services Based Selection Implementation exercices 2020, 2021, 2022 and demand-side activities et clôture PAPS PAA 3.5 MSP 10/2021/SERV/MSP/P/AS/PAP Improving capacity to S / Recrutement d'un cabinet manage, coordinate, monitor Quality And Cost- Pending pour l'audit externe comptes IDA / 56440 Post Open - National 45,455.00 0.00 2021-07-15 2021-08-14 2021-09-28 2021-11-07 2021-12-07 2022-01-27 2022-03-28 2022-06-26 and evaluate RHN services Based Selection Implementation PAPS pour l'exercice 2021 et and demand-side activities clôture PAPS INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Improving capacity to 011/2017/SERV/MSP/FC-PDS Individual manage, coordinate, monitor / Recrutement d'un Expert en IDA / 56440 Post Consultant Limited 8,000.00 45,165.00 Signed 2017-07-17 2017-09-27 2017-07-22 2017-10-25 2017-08-12 2017-12-22 2017-09-16 2018-02-01 2017-12-15 and evaluate RHN services NET MAP Selection and demand-side activities 09/2017SERV/MSP/FC-PDS / Improving capacity to Individual Accompagnement du manage, coordinate, monitor IDA / D0620 Post Consultant Open 10,000.00 24,523.73 Completed 2017-11-28 2017-07-10 2018-01-16 2018-06-01 2018-02-06 2018-06-13 2018-03-13 2018-06-26 2018-06-11 2018-10-12 processus de partage de and evaluate RHN services Selection connaissances and demand-side activities NE-PAPS-31810/1/CSF / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,038.24 Signed 2017-12-22 2017-12-26 2018-02-09 2018-03-20 2018-03-02 2018-04-10 2018-04-06 2018-05-03 2018-10-03 RHN services des Communes de Guidan Selection Sory et Sae Saboua dans la région de Maradi 08/2017/SERV/MSP/FC-PDS / Identification et collecte de Improving capacity to Individual bonnes pratiques en matières manage, coordinate, monitor IDA / D0620 Post Consultant Open 60,000.00 16,409.40 Signed 2017-12-26 2017-12-28 2018-02-13 2018-02-23 2018-03-06 2018-03-15 2018-04-10 2018-04-09 2018-07-09 de fourniture de services de and evaluate RHN services Selection santé de la reproduction et and demand-side activities nutrition 33/2017/SERV/MPFPE / Recrutement d'un Consultant Individual pour l'élaboration d'une Increasing the demand of IDA / 56440 Post Consultant Open 10,400.00 16,441.97 Signed 2017-12-20 2017-12-28 2018-02-07 2018-04-19 2018-02-28 2018-05-09 2018-04-04 2018-05-23 2018-10-01 stratégie nationale RHN services Selection d'autonomisation économique de la femme 010/2017/SERV/MSP/FC-PDS Improving capacity to Individual / Recrutement de 3 coaches manage, coordinate, monitor IDA / 56440 Prior Consultant Limited 600,000.00 0.00 Canceled 2017-10-02 2017-11-01 2017-10-07 2017-07-28 2017-10-28 2017-12-02 2018-03-02 pour les régions de and evaluate RHN services Selection Zinder,Maradi et Tahoua and demand-side activities NE-PAPS-31810/2/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,038.24 Signed 2017-12-22 2017-12-26 2018-02-09 2018-03-20 2018-03-02 2018-04-10 2018-04-06 2018-05-02 2018-10-03 RHN services des Communes de Gangara et Selection Tchadoua dans la région de Maradi Page 5 NE-PAPS-31810/3/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,038.24 Signed 2017-12-22 2017-12-26 2018-02-09 2018-03-20 2018-03-02 2018-04-10 2018-04-06 2018-05-02 2018-10-03 RHN services des Communes de Maireyrey Selection et Issawan dans la région de Maradi NE-PAPS-31810/4/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,052.56 Signed 2017-12-22 2017-12-26 2018-02-09 2018-03-20 2018-03-02 2018-04-10 2018-04-06 2018-05-02 2018-10-03 RHN services des Communes de Selection Hawandawaki Baoudeta et Kona dans la région de Maradi NE-PAPS-31810/5/CFS / Recrutement d'un Responsable pour Individual l'accompagnement Communal Increasing the demand of IDA / 56440 Post Consultant Open 6,000.00 6,052.56 Signed 2017-12-22 2017-12-26 2018-02-09 2018-03-19 2018-03-02 2018-04-10 2018-04-06 2018-05-02 2018-10-03 des Communes de RHN services Selection Korahane,Roumbou, Azogoret Gadabadji dans la région de Maradi NE-PAPS-31810/6/CFS / Recrutement d'un Individual Responsable pour Increasing the demand of IDA / 56440 Post Consultant Open 6,000.00 6,027.68 Signed 2017-12-20 2017-12-26 2018-02-07 2018-03-20 2018-02-28 2018-04-10 2018-04-04 2018-05-03 2018-10-01 l'accompagnement Communal RHN services Selection des Communes de Yaouriet Tarka dans la région de Zinder NE-PAPS-31810/7/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,027.68 Signed 2017-12-20 2017-12-26 2018-02-07 2018-03-21 2018-02-28 2018-04-10 2018-04-04 2018-05-03 2018-10-01 RHN services des Communes de Gouchi et Selection Dogo Dogo dans la région de Zinder NE-PAPS-31810/8/CFS / Recrutement d'un Individual Responsable pour Increasing the demand of IDA / 56440 Post Consultant Open 6,000.00 6,027.68 Signed 2017-12-20 2017-12-26 2018-02-07 2018-03-22 2018-02-28 2018-04-10 2018-04-04 2018-05-03 2018-10-01 l'accompagnement Communal RHN services Selection des Communes de Kelle dans la région de Zinder NE-PAPS-31810/9/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,038.24 Signed 2017-12-19 2017-12-26 2018-02-06 2018-03-22 2018-02-27 2018-04-10 2018-04-03 2018-05-03 2018-09-30 RHN services des Communes de Selection Takanamatt, Afala et Kao dans la région de Tahoua NE-PAPS-31810/10/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,038.24 Signed 2017-12-19 2017-12-26 2018-02-06 2018-03-22 2018-02-27 2018-04-10 2018-04-03 2018-05-03 2018-09-30 RHN services des Communes de Bagaroua Selection et Tajae dans la région de Tahoua NE-PAPS-31810/11/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,038.24 Signed 2017-12-19 2017-12-26 2018-02-06 2018-03-21 2018-02-27 2018-04-10 2018-04-03 2018-05-03 2018-09-30 RHN services des Communes de Ourno Selection Bangui dans la région de Tahoua NE-PAPS-31810/12/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,027.68 Signed 2017-12-14 2017-12-26 2018-02-01 2018-03-21 2018-02-22 2018-04-10 2018-03-29 2018-05-03 2018-09-25 RHN services des Communes de Kargui Selection Bangou et Tombokoirey dans la région de Dosso NE-PAPS-31810/13/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,027.68 Signed 2017-12-14 2017-12-26 2018-02-01 2018-03-16 2018-02-22 2018-04-10 2018-03-29 2018-05-03 2018-09-25 RHN services des Communes de Guecheme Selection Tibiri et Kieche dans la région de Dosso NE-PAPS-31810/14/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,027.68 Signed 2017-12-14 2017-12-26 2018-02-01 2018-03-22 2018-02-22 2018-04-10 2018-03-29 2018-05-03 2018-09-25 RHN services des Communes de Falwel et Selection Sokorbe dans la région de Dosso NE-PAPS-31810/15/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,027.68 Signed 2017-12-28 2017-12-26 2018-02-15 2018-03-21 2018-03-08 2018-04-10 2018-04-12 2018-05-03 2018-10-09 RHN services des Communes de Dingazi et Selection Tagazar dans la région de Tillabery 06/2017/SERV/MSP/FC-PDS / Inventaire des immobilisations, entente Improving capacity to directe avec CESI, du MSP y manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 50,000.00 0.00 Canceled 2018-01-31 2018-03-02 2018-05-16 2018-07-25 compris celles FC et GAVI and evaluate RHN services pour compléter l'inventaire du and demand-side activities 1er juillet 2015 au 31 Décembre 2016 Page 6 NE-PAPS-31810/16/CFS / Recrutement d'un Responsable pour Individual Increasing the demand of l'accompagnement Communal IDA / 56440 Post Consultant Open 6,000.00 6,027.68 Signed 2018-01-25 2018-01-23 2018-03-15 2018-03-16 2018-04-05 2018-04-10 2018-05-10 2018-05-03 2018-11-06 RHN services des Communes de Tampou et Selection Torodi dans la région de Tillabery 34/2017/FC PDS / Extension Improving capacity to de la base de données manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 20,000.00 18,531.13 Completed 2018-02-15 2018-02-05 2018-04-01 2018-02-05 2018-06-11 2018-02-22 2018-12-08 2018-05-14 TOM2PRO avec le consultant and evaluate RHN services TOMATE (CESI informatique) and demand-side activities 32/2017/SERV/MSP/FC-PDS / RRI Renforcement des capacités RRA en entente directe avec Joel des acteurs Improving capacity to selon une dynamique de Individual manage, coordinate, monitor changement portant sur IDA / D0620 Post Consultant Direct 100,000.00 130,079.55 Signed 2018-02-26 2018-05-04 2018-04-07 2018-05-04 2018-05-07 2018-05-04 2018-06-20 2018-05-04 2019-06-15 and evaluate RHN services l'Approche de Résultats Selection and demand-side activities Rapides RRA ou RRI avec Mr EBOA E. Ismael Joel Coach régional pour les régions de Tahoua, Maradi et Zinder 22/2018/DEP/MSP-CS-INDV Improving capacity to / Recrutement d'un Individual manage, coordinate, monitor Consultant international sur IDA / 56440 Post Consultant Limited 40,000.00 18,846.34 Signed 2018-05-15 2018-05-16 2018-06-14 2018-05-18 2018-07-14 2018-07-20 2018-08-19 2018-08-08 2019-02-15 and evaluate RHN services l'arbrede confiance et le Selection and demand-side activities baromètre de confiance 23/2018/DEP/MSP-CS-INDV Improving the provision of Individual / Recrutement d'un expert IDA / 56440 high quality RHN services Post Consultant Limited 40,000.00 0.00 Canceled 2018-06-14 2018-05-30 2018-07-14 2019-07-11 2018-08-13 2018-09-18 2019-01-16 international sur le leadership (DLI-based financing) Selection et le RRI 25/2018/DEP/MSP-CS-INDV Improving the provision of Individual / Recrutement d'un IDA / 56440 high quality RHN services Post Consultant Limited 80,000.00 9,621.96 Signed 2018-06-15 2018-05-15 2018-07-15 2018-05-18 2018-08-14 2018-06-06 2018-09-19 2018-06-20 2018-12-18 Consultant pour l'évaluation à (DLI-based financing) Selection mi parcours du PAPS 26/2018/DEP/MSP-CS-INDV Improving the provision of Individual / Recrutement d'un consultant IDA / 56440 high quality RHN services Post Consultant Limited 50,000.00 21,673.47 Terminated 2018-06-15 2018-05-15 2018-07-05 2018-05-16 2018-08-04 2018-07-24 2018-09-08 2018-08-08 2018-12-07 pour évaluation du processus (DLI-based financing) Selection RRI 28/2018/DEP/MSP CS-INDV Improving the provision of Individual / Recrutement d'un Chauffeur IDA / 56440 high quality RHN services Post Consultant Open 12,000.00 6,763.23 Signed 2018-06-28 2018-06-29 2018-09-21 2018-09-11 2018-10-12 2018-12-05 2018-11-16 2019-04-03 2019-11-11 pour le RRI/DEP (DLI-based financing) Selection 32/2018 PAPS-67941-CS- Improving the provision of Individual INDV / Recrutement IDA / 56440 high quality RHN services Post Consultant Open 28,800.00 0.00 Canceled 2018-07-30 2018-07-14 2018-11-12 2018-12-12 2019-01-23 2020-01-18 Comptable pour le fonds (DLI-based financing) Selection commun 30/CFS/2018/SCE / AT Improving capacity to BANDE1 ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune BANDE dans la Selection and demand-side activities Region de Zinder 59/CFS/2018/SCE / AT Improving capacity to ADJEKORIA MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune ADJEKORIA dans Selection and demand-side activities la Region de Maradi 22/CFS/2018/SCE / AT KAO Improving capacity to TA Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune KAO dans la Selection and demand-side activities Region de Tahoua 5/CFS/2018/SCE / AT Improving capacity to Dogonkiria Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune DOGONKIRIA dans Selection and demand-side activities la Region de Dosso 50/CFS/2018/SCE / AT Improving capacity to DARGOL TI Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services commune DARGOL dans la Selection and demand-side activities Region de Tillabery 6/CFS/2018/SCE / AT Improving capacity to FALWEL Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune FALWEL dans la Selection and demand-side activities Region de Dosso 7/CFS/2018/SCE / AT Improving capacity to GUECHEME Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune GUECHEME dans la Selection and demand-side activities Region de Dosso 8/CFS/2018/SCE / AT Improving capacity to KARGUI B Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune KARGUI BANGOU Selection and demand-side activities dans la Region de Dosso 9/CFS/2018/SCE / AT KIECHE Improving capacity to Recrutement d'un (1) Agent Individual manage, coordinate, monitor de Terrain pour la commune IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services KIECHE dans la Region de Selection and demand-side activities Dosso 10/CFS/2018/SCE / AT Improving capacity to MOKKO Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune MOKKO dans la Selection and demand-side activities Region de Dosso Page 7 11/CFS/2018/SCE / AT Improving capacity to SOKORBE Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune SOKORBE dans la Selection and demand-side activities Region de Dosso 12/CFS/2018/SCE / AT TIBIRI Improving capacity to DO Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune TIBIRI dans la Selection and demand-side activities Region de Dosso 13/CFS/2018/SCE / AT Improving capacity to TOMBO KOAREY Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-13 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services la commune TOMBO KOAREY Selection and demand-side activities dans la Region de Dosso 14/CFS/2018/SCE / AT Improving capacity to TIBIRI2 Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-12 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune TIBIRI dans la Selection and demand-side activities Region de Dosso 15/CFS/2018/SCE / AT Improving capacity to KARGUI2 Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-12 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune KARGUI BANGOU Selection and demand-side activities dans la Region de Dosso 16/CFS/2018/SCE / AT Improving capacity to GUECHEME Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-24 2018-11-12 2019-04-03 2019-05-03 2019-06-13 2020-06-07 and evaluate RHN services commune GUECHEME dans la Selection and demand-side activities Region de Dosso 17/CFS/2018/SCE / AT Improving capacity to AFALA TA Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune AFALA dans la Selection and demand-side activities Region de Tahoua 18/CFS/2018/SCE / AT Improving capacity to ALAKEYE TA Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune ALLAKEYE dans la Selection and demand-side activities Region de Tahoua 19/CFS/2018/SCE / AT Improving capacity to BAGAROUA TA Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services la commune BAGAROUA dans Selection and demand-side activities la Region de Tahoua 20/CFS/2018/SCE / AT Improving capacity to BANGUI TA Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune BANGUI dans la Selection and demand-side activities Region de Tahoua 21/CFS/2018/SCE / AT Improving capacity to KALFOU TA Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune KALFOU dans la Selection and demand-side activities Region de Tahoua 23/CFS/2018/SCE / AT Improving capacity to OURNO TA Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune OURNO dans la Selection and demand-side activities Region de Tahoua 24/CFS/2018/SCE / AT Improving capacity to TABALAK TA Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services la commune TABALAK dans la Selection and demand-side activities Region de Tahoua 25/CFS/2018/SCE / AT Improving capacity to TAJAE TA Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune TAJAE dans la Selection and demand-side activities Region de Tahoua 26/CFS/2018/SCE / AT Improving capacity to TAKANAMATT TA Individual manage, coordinate, monitor Recrutement d'un (1) Agent de IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services Terrain pour la commune Selection and demand-side activities TAKANAMATT dans la Region de Tahoua 27/CFS/2018/SCE / AT Improving capacity to TAMASKE TA Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services la commune TAMASKE dans Selection and demand-side activities la Region de Tahoua 28/CFS/2018/SCE / AT Improving capacity to TAMAYA TA Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune TAMAYA dans la Selection and demand-side activities Region de Tahoua 29/CFS/2018/SCE / AT Improving capacity to AFALA2 TA Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-26 2018-11-12 2019-04-05 2019-05-05 2019-06-15 2020-06-09 and evaluate RHN services commune AFALA dans la Selection and demand-side activities Region de Tahoua 31/CFS/2018/SCE / AT Improving capacity to DOGO1 ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune DOGO dans la Selection and demand-side activities Region de Zinder Page 8 32/CFS/2018/SCE / AT Improving capacity to DOGO DOGO ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune DOGO DOGO Selection and demand-side activities dans la Region de Zinder 33/CFS/2018/SCE / AT Improving capacity to DROUM ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune DROUM dans la Selection and demand-side activities Region de Zinder 34/CFS/2018/SCE / AT Improving capacity to GOUCHI ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune GOUCHI dans la Selection and demand-side activities Region de Zinder 35/CFS/2018/SCE / AT Improving capacity to KANCHE1 ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune KANTCHE dans Selection and demand-side activities la Region de Zinder 36/CFS/2018/SCE / AT KELLE Improving capacity to ZR Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune KELLE dans la Selection and demand-side activities Region de Zinder 37/CFS/2018/SCE / AT Improving capacity to OLLELEWA1 ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune OLLELEWA dans Selection and demand-side activities la Region de Zinder 38/CFS/2018/S38 / AT Improving capacity to TARKA ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune TARKA dans la Selection and demand-side activities Region de Zinder 39/CFS/2018/SCE / AT Improving capacity to WACHA ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune WACHA dans la Selection and demand-side activities Region de Zinder 40/CFS/2018/SCE / AT Improving capacity to YAOURI ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune YAOURI dans la Selection and demand-side activities Region de Zinder 41/CFS/2018/SCE / AT Improving capacity to BANDE 2 ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune BANDE dans la Selection and demand-side activities Region de Zinder 42/CFS/2018/SCE / AT Improving capacity to KANTCHE 2 ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune KANTCHE dans Selection and demand-side activities la Region de Zinder 43/CFS/2018/SCE / AT KELLE Improving capacity to 2 ZR Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune KELLE dans la Selection and demand-side activities Region de Zinder 44/CFS/2018/SCE / AT Improving capacity to OLLELEWA 2 ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune OLLELEWA dans Selection and demand-side activities la Region de Zinder 45/CFS/2018/SCE / AT Improving capacity to TARKA 2 ZR Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services commune TARKA dans la Selection and demand-side activities Region de Zinder 46/CFS/2018/SCE / AT Improving capacity to WACHA 2 ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune WACHA dans la Selection and demand-side activities Region de Zinder 47/CFS/2018/SCE / AT Improving capacity to YAOURI 2 ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune YAOURI dans la Selection and demand-side activities Region de Zinder 48/CFS/2018/SCE / AT Improving capacity to KANTCHE 3 ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune KANTCHE dans Selection and demand-side activities la Region de Zinder 49/CFS/2018/SCE / AT Improving capacity to KANTCHE 4 ZR Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-27 2018-11-13 2019-04-06 2019-05-06 2019-06-16 2020-06-10 and evaluate RHN services la commune KANTCHE dans Selection and demand-side activities la Region de Zinder 51/CFS/2018/SCE / AT Improving capacity to DINGAZI TI Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services commune DINGAZI dans la Selection and demand-side activities Region de Tillabery Page 9 52/CFS/2018/SCE / AT Improving capacity to KOURFEY TI Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services commune KOURTEYE dans la Selection and demand-side activities Region de Tillabery 53/CFS/2018/SCE / AT Improving capacity to TAGAZAR TI Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services commune TAGAZAR dans la Selection and demand-side activities Region de Tillabery 54/CFS/2018/SCE / AT Improving capacity to TAMOU TI Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services commune TAMOU dans la Selection and demand-side activities Region de Tillabery 55/CFS/2018/SCE / AT Improving capacity to TORODI 1 TI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services la commune TORODI dans la Selection and demand-side activities Region de Tillabery 56/CFS/2018/SCE / AT Improving capacity to KOURFEYE 2 TI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services la commune KOURTEYE dans Selection and demand-side activities la Region de Tillabery 57/CFS/2018/SCE / AT Improving capacity to KOURFEYE 3 TI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services la commune KOURTEYE dans Selection and demand-side activities la Region de Tillabery 58/CFS/2018/SCE / AT Improving capacity to TORODI 2 TI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-28 2018-11-14 2019-04-07 2019-05-07 2019-06-17 2020-06-11 and evaluate RHN services la commune TORODI dans la Selection and demand-side activities Region de Tillabery 60/CFS/2018/SCE / AT MAIREYREY MI Recrutement Improving capacity to Individual d'un (1) Agent de Terrain pour manage, coordinate, monitor IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 la commune ALHASSANE and evaluate RHN services Selection MAIREYREY dans la Region de and demand-side activities Maradi 61/CFS/2018/SCE / AT Improving capacity to AZAGOR Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services commune AZAGOR dans la Selection and demand-side activities Region de Maradi 62/CFS/2018/SCE / AT Improving capacity to BADER GOULA MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune BADER GOULA Selection and demand-side activities dans la Region de Maradi 63/CFS/2018/SCE / AT Improving capacity to BAOUDETA MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune BAOUDETA dans Selection and demand-side activities la Region de Maradi 64/CFS/2018/SCE / AT Improving capacity to CHADAKORI MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune CHADAKORI dans Selection and demand-side activities la Region de Maradi 65/CFS/2018/SCE / AT DAN Improving capacity to ISSA MI Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services commune DAN ISSA dans la Selection and demand-side activities Region de Maradi 66/CFS/2018/SCE / AT Improving capacity to GADABEDJI MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune GADABEDJI dans Selection and demand-side activities la Region de Maradi 67/CFS/2018/SCE / AT Improving capacity to GANGARA MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune GANGARA dans Selection and demand-side activities la Region de Maradi 68/CFS/2018/SCE / AT Improving capacity to GUIDAN SORI MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune GUIDAN SORY Selection and demand-side activities dans la Region de Maradi 69/CFS/2018/SCE / AT HAWANDAWAKI MI Improving capacity to Individual Recrutement d'un (1) Agent de manage, coordinate, monitor IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 Terrain pour la commune and evaluate RHN services Selection HAWANDAWAKI dans la and demand-side activities Region de Maradi 70/CFS/2018/SCE / AT Improving capacity to ISSAWANE MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune ISSAWANE dans Selection and demand-side activities la Region de Maradi Page 10 71/CFS/2018/SCE / AT Improving capacity to KOONA MI Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services commune KOONA dans la Selection and demand-side activities Region de Maradi 72/CFS/2018/SCE / AT Improving capacity to KORAHANE MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune KORAHANE dans Selection and demand-side activities la Region de Maradi 73/CFS/2018/SCE / AT Improving capacity to KORNAKA MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune KORNAKA dans Selection and demand-side activities la Region de Maradi 74/CFS/2018/SCE / AT Improving capacity to OURAFANE MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune OURAFANE dans Selection and demand-side activities la Region de Maradi 75/CFS/2018/SCE / AT Improving capacity to ROUMBOU I MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune ROUMBOU I dans Selection and demand-side activities la Region de Maradi 76/CFS/2018/SCE / AT SAE Improving capacity to SABOUA 1 MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune SAE SABOUA Selection and demand-side activities dans la Region de Maradi 77/CFS/2018/SCE / AT Improving capacity to TCHADOUA 1 MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune TCHADOUA dans Selection and demand-side activities la Region de Maradi 78/CFS/2018/SCE / AT Improving capacity to TCHAKE MI Recrutement d'un Individual manage, coordinate, monitor (1) Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services commune TCHAKE dans la Selection and demand-side activities Region de Maradi 79/CFS/2018/SCE / AT TIBIRI Improving capacity to Maradi Recrutement d'un (1) Individual manage, coordinate, monitor Agent de Terrain pour la IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services commune TIBIRI M dans la Selection and demand-side activities Region de Maradi 80/CFS/2018/SCE / AT GUIDAN SORY 2 MI Improving capacity to Individual Recrutement d'un (1) Agent de manage, coordinate, monitor IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 Terrain pour la commune and evaluate RHN services Selection GUIDAN SORY dans la Region and demand-side activities de Maradi 81/CFS/2018/SCE / AT SAE Improving capacity to SABOUA 2 MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune SAE SABOUA Selection and demand-side activities dans la Region de Maradi 82/CFS/2018/SCE / AT Improving capacity to TCHADOUA 2 MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune TCHADOUA dans Selection and demand-side activities la Region de Maradi 83/CFS/2018/SCE / AT SAE Improving capacity to SABOUA 3 MI Recrutement Individual manage, coordinate, monitor d'un (1) Agent de Terrain pour IDA / 56440 Post Consultant Open 1,600.00 0.00 Canceled 2018-12-31 2018-11-14 2019-04-10 2019-05-10 2019-06-20 2020-06-14 and evaluate RHN services la commune SAE SABOUA Selection and demand-side activities dans la Region de Maradi 46/DEP/MSP/2019 / Enquête Improving capacity to LQAS PAPS: Recrutement Individual manage, coordinate, monitor cabinet/firme enquête selon IDA / D0620 Post Consultant Open 200,000.00 66,123.45 Signed 2019-05-30 2019-04-12 2019-08-18 2019-10-10 2019-09-17 2019-10-10 2019-10-22 2019-10-15 2020-02-19 and evaluate RHN services approche LQAS indicateurs Selection and demand-side activities PAPS 47/DS/MSP/2019 / Vérificateur interne: Improving capacity to Individual Recrutement d'un Consultant manage, coordinate, monitor IDA / D0620 Post Consultant Open 200,000.00 0.00 Canceled 2019-04-30 2019-03-25 2019-07-24 2019-08-23 2019-09-28 2020-09-22 pour vérifier les résultats and evaluate RHN services Selection fournis par le MSP Vérificateur and demand-side activities interne (DS) 49/2019/DEP/MSP / Coach TAHOUA Recrutement de coache pour la région de Improving capacity to Individual Tahoua Appui pour la mise manage, coordinate, monitor IDA / D0620 Post Consultant Limited 118,000.00 110,639.44 Signed 2019-05-15 2019-04-19 2019-06-04 2019-05-16 2019-07-04 2019-10-12 2019-08-08 2019-10-15 2020-08-02 en œuvre du Projet d'Appui à and evaluate RHN services Selection la Population et à la Santé and demand-side activities selon l'approche par résultat rapide (ARR/RRI) 50/2019/DEP/MSP / Coch ZINDER Recrutement de coache pour la région de Improving capacity to Individual Zinder Appui pour la mise en manage, coordinate, monitor IDA / D0620 Post Consultant Limited 118,000.00 0.00 Canceled 2019-05-15 2019-04-19 2019-06-04 2019-05-16 2019-07-04 2019-10-10 2019-08-08 2020-08-02 œuvre du Projet d'Appui à la and evaluate RHN services Selection Population et à la Santé selon and demand-side activities l'approche par résultat rapide (ARR/RRI) Page 11 48/2019/DEP/MSP/SERV / Evaluation RRR Recrutement Improving the provision of Individual d'un consultant pour IDA / 56440 high quality RHN services Post Consultant Limited 80,000.00 36,033.20 Signed 2019-04-15 2019-04-07 2019-05-15 2019-04-30 2019-06-14 2019-09-16 2019-08-05 2019-10-17 2019-11-03 évaluation du processus (DLI-based financing) Selection l'approche par résultat rapide (ARR/RRI) NE-PAPS-54/2019/MSP/INDV Improving capacity to / Coord Tech RECRUTEMENT Individual manage, coordinate, monitor D'UN COORDONNATEUR IDA / D0620 Post Consultant Open 72,000.00 59,450.40 Signed 2019-08-30 2019-08-14 2019-12-09 2020-02-26 2019-12-30 2020-04-22 2020-02-12 2020-04-23 2020-03-19 and evaluate RHN services TECHNIQUE CHARGE DES Selection and demand-side activities PROJETS PAPS MTN/P 56/2019/SCE/CFS / Agence Improving capacity to DOSSO Recrutement Agence manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 3,977.00 3,385.00 Signed 2019-12-31 2019-12-23 2020-02-19 2020-01-22 2020-04-25 2020-02-24 2021-04-20 de paiement de bourses à and evaluate RHN services DOSSO and demand-side activities 57/2019/SCE/CFS / Agence Improving capacity to TAHOUA Recrutement Agence manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 1,650.00 1,404.49 Signed 2019-12-31 2019-12-23 2020-02-19 2020-01-22 2020-04-25 2020-02-28 2021-04-20 de paiement de bourses à and evaluate RHN services TAHOUA and demand-side activities 58/2019/SCE/CFS / Agence Improving capacity to MARADI Recrutement Agence manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 8,002.00 6,828.83 Signed 2019-12-31 2019-12-23 2020-02-19 2020-01-22 2020-04-25 2020-02-28 2021-04-20 de paiement de bourses à and evaluate RHN services MARADI and demand-side activities 59/2019/SCE/CFS / Agence Improving capacity to ZINDER Recrutement Agence manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 5,544.00 4,718.42 Signed 2019-12-31 2019-12-23 2020-02-19 2020-01-22 2020-04-25 2020-02-24 2021-04-20 de paiement de bourses à and evaluate RHN services ZINDER and demand-side activities 60/2019/SCE/CFS / Agence Improving capacity to TILLABERI Recrutement manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 1,502.00 1,278.26 Signed 2019-12-31 2019-12-23 2020-02-19 2020-01-22 2020-04-25 2020-02-24 2021-04-20 Agence de paiement de and evaluate RHN services bourses à TILLABERI and demand-side activities 61/2020/MSP/PAPS / ED avec Improving capacity to EME Recrutement d’un manage, coordinate, monitor Vérificateur externe pour IDA / D0620 Post Direct Selection Direct 272,727.00 237,818.48 Signed 2020-02-28 2020-03-20 2020-03-09 2020-04-03 2020-05-13 2020-07-24 2020-07-12 and evaluate RHN services vérifier les résultats fournis and demand-side activities par le MSP (DS) année 2019 Improving capacity to 04/2020/CFS/AG DOSSO / manage, coordinate, monitor Recrutement Agence de IDA / D0620 Post Direct Selection Direct 7,681.75 6,666.55 Signed 2020-07-15 2020-07-26 2020-09-03 2020-07-29 2020-11-08 2020-08-17 2021-11-03 and evaluate RHN services paiement de bourses à DOSSO and demand-side activities 05/2020/CFS/AG TAHOUA / Improving capacity to Recrutement Agence de manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 3,945.60 4,586.41 Signed 2020-07-15 2020-07-26 2020-09-03 2020-07-29 2020-11-08 2020-08-17 2021-11-03 paiement de bourses à and evaluate RHN services TAHOUA and demand-side activities 06/2020/CFS/AG MARADI / Improving capacity to Recrutement Agence de manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 17,209.30 15,925.04 Signed 2020-07-15 2020-07-26 2020-09-03 2020-07-29 2020-11-08 2020-08-17 2021-11-03 paiement de bourses à and evaluate RHN services MARADI and demand-side activities 07/2020/CFS/AG ZINDER / Improving capacity to Recrutement Agence de manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 9,875.78 8,738.25 Signed 2020-07-15 2020-07-26 2020-09-03 2020-07-29 2020-11-08 2020-08-17 2021-11-03 paiement de bourses à and evaluate RHN services ZINDER and demand-side activities 08/2020/CFS/AG TILLABERI / Improving capacity to Recrutement Agence de manage, coordinate, monitor IDA / D0620 Post Direct Selection Direct 3,078.98 3,328.56 Signed 2020-07-15 2020-07-26 2020-09-03 2020-07-29 2020-11-08 2020-08-17 2021-11-03 paiement de bourses à and evaluate RHN services TILLABERI and demand-side activities 10/2020/SERV/MSP/PAPS / Improving the provision of Individual Recrutement Consultant1 Under IDA / 56440 high quality RHN services Post Consultant Limited 36,364.00 0.00 2021-02-15 2021-05-21 2021-03-17 2021-04-16 2021-06-07 2021-08-06 individuel pour l'évaluation Implementation (DLI-based financing) Selection finale du projet 11/2020/SERV/MSP/PAPS / Improving the provision of Individual Recrutement Consultant2 IDA / 56440 high quality RHN services Post Consultant Limited 36,364.00 0.00 Canceled 2021-02-15 2021-03-17 2021-04-16 2021-06-07 2021-08-06 individuel pour l'évaluation (DLI-based financing) Selection finale du projet Improving capacity to 09/2020/SERV/MSP/PAPS / manage, coordinate, monitor Recrutement de coache RRI IDA / D0620 Post Direct Selection Direct 127,273.00 0.00 Canceled 2021-01-15 2020-12-31 2021-03-06 2021-01-06 2021-05-19 2021-11-15 and evaluate RHN services pour Niamey and demand-side activities 08/2021/SERV/PFS/PAPS / Recrutement Institut de Micro Finance IMF pour assurer les Improving capacity to paiements de bourses manage, coordinate, monitor Under IDA / D0620 Post Direct Selection Direct 4,700.00 0.00 2021-06-16 2021-05-27 2021-08-05 2021-06-02 2021-10-10 2022-10-05 scolaires aux filles and evaluate RHN services Implementation bénéficiaires du Cash and demand-side activities Transfert dans la Région de TILLABERI 06/2021/SERV/PFS/PAPS / Recrutement Institut de Micro Finance IMF pour assurer les Improving capacity to paiements de bourses manage, coordinate, monitor Under IDA / D0620 Post Direct Selection Direct 16,568.00 0.00 2021-06-15 2021-05-27 2021-08-04 2021-06-02 2021-10-09 2022-10-04 scolaires aux filles and evaluate RHN services Implementation bénéficiaires du Cash and demand-side activities Transfert dans la Région de MARADI 07/2021/SERV/PFS/PAPS / Recrutement Institut de Micro Finance IMF pour assurer les Improving capacity to paiements de bourses manage, coordinate, monitor Under IDA / D0620 Post Direct Selection Direct 13,426.00 0.00 2021-06-15 2021-05-27 2021-08-04 2021-06-02 2021-10-09 2022-10-04 scolaires aux filles and evaluate RHN services Implementation bénéficiaires du Cash and demand-side activities Transfert dans la Région de ZINDER Page 12 04/2021/SERV/PFS/PAPS / Recrutement Institut de Micro Finance IMF pour assurer les Improving capacity to paiements de bourses manage, coordinate, monitor Under IDA / D0620 Post Direct Selection Direct 6,074.00 0.00 2021-06-15 2021-05-27 2021-08-04 2021-06-02 2021-10-09 2022-10-04 scolaires aux filles and evaluate RHN services Implementation bénéficiaires du Cash and demand-side activities Transfert dans la Région de Dosso 05/2021/SERV/PFS/PAPS / Recrutement Institut de Micro Finance IMF pour assurer les Improving capacity to paiements de bourses manage, coordinate, monitor Under IDA / D0620 Post Direct Selection Direct 6,928.00 0.00 2021-06-15 2021-05-27 2021-08-04 2021-06-02 2021-10-09 2022-10-04 scolaires aux filles and evaluate RHN services Implementation bénéficiaires du Cash and demand-side activities Transfert dans la Région de TAHOUA 01/2021/SERV/MSP/P/AS/PAP Improving the provision of Individual S / Recrutement d'un Under IDA / 56440 high quality RHN services Post Consultant Open 72,727.00 0.00 2021-06-30 2021-06-10 2021-09-18 2021-10-18 2021-12-01 2022-03-01 consultant individuel pour Implementation (DLI-based financing) Selection l'évaluation finale du PAPS 09/2021/SERV/MSP/P/AS/PAP Improving capacity to S / Recrutement d'un cabinet manage, coordinate, monitor Under IDA / 56440 Post Direct Selection Direct 36,364.00 22,870.67 2021-06-30 2021-06-10 2021-07-30 2021-06-21 2021-10-03 2021-11-02 pour l'audit externe comptes and evaluate RHN services Implementation PAPS pour l'exercice 2020 and demand-side activities Page 13 Procurement Plan THIRD PHASE OF CENTRAL ASIA ROAD LINKS PROJECT (CARs-3) PROJECT PREPARATION GRANT I. General 1. Bank’s approval Date of the procurement Plan [Original:] 2. Date of General Procurement Notice: 3/21/2017 3. Period covered by this procurement plan: The procurement period of project covered from March 2017to December 2017 July 9, 2010 PROCUREMENT Central Asia : Third Phase of the Central Asia Regional Links Program (CARs-3) PLAN General Information Country: Central Asia Bank’s Approval Date of the Original Procurement Plan: 2017-04-01 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159220 GPN Date: 2017-03-21 Project Name: Third Phase of the Central Asia Regional Links Program (CARs-3) Loan / Credit No: / , IDA / D3850, IDA / 63280 I Executing Agency(ies): PIG under Ministry of Transportation and Roads WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CARS3/NCB/CW/1 / Sustainable Tourism Pending Single Stage - One 2022-07- Construction of 5 tourist IDA / 63280 Development in Issyk-Kul Post Request for Bids Open - National 1,870,550.00 0.00 Implementat 2021-09-01 2021-09-08 2021-10-20 2021-11-19 2022-01-04 Envelope 05 service centers Oblast ion CARS3/NCB/CW/2 / Pending Rehabilitation of current Aviation Safety and Service Single Stage - One 2022-03- IDA / 63280 Post Request for Bids Open - National 490,000.00 0.00 Implementat 2021-04-30 2021-05-14 2021-06-25 2021-07-25 2021-09-02 buildings and facilities of the Provision Envelope 01 ion Kyrgyz Aviation Institute (KAI) CARS3/ICB/CW/1 / Road Regional Connections, rehabilitation (Tup-Karkyra till Associated Facilities and 38,500,000.0 2019-06- IDA / 63280 Prior Request for Bids Open - International 0.00 Canceled 2019-06-01 2019-06-01 2019-06-01 2019-06-01 2019-06-01 Kyrgyz-Kazakh border 37 Equipment in Issyk-Kul 0 01 km+14) Oblast CARS3/ICB/CW/1/1 / Road Regional Connections, Request for Bids - Pending rehabilitation (Tup-Karkyra till Associated Facilities and Small Works SPD 38,500,000.0 2020-05- IDA / 63280 Prior Request for Bids 0.00 Implementat 2019-06-01 2019-06-06 2019-07-18 2019-09-30 2019-11-04 Kyrgyz-Kazakh border 37 Equipment in Issyk-Kul (2 envelope 0 02 ion km+14) Oblast process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARS3/ICB/G/01 / Regional Connections, Equipment for road Pending Associated Facilities and Single Stage - One maintenance: snow removal IDA / 63280 Prior Request for Bids Open - International 4,100,000.00 0.00 Implementati 2022-02-02 2022-02-23 2022-04-24 2022-05-24 2022-07-05 2023-01-01 Equipment in Issyk-Kul Envelope equipment to ensure year- on Oblast round operation of the Tyup- Karkyra BCP road; Pending CARS3/ICB/G/02 / Office Aviation Safety and Service Single Stage - One IDA / D3850 Post Request for Bids Open - International 450,000.00 0.00 Implementati 2021-02-25 2021-03-11 2021-04-22 2021-05-22 2021-06-26 2021-12-23 equipment for СAA Provision Envelope on CARS3/ICB/G/03 / Goods Pending Aviation Safety and Service Single Stage - One and equipment for Kyrgyz IDA / D3850 Post Request for Bids Open - International 300,000.00 0.00 Implementati 2021-04-30 2021-05-10 2021-06-21 2021-07-21 2021-09-02 2022-02-07 Provision Envelope Aviation Institute (simulators) on CARS3/SH/G/01 / Testing Pending Aviation Safety and Service Request for Single Stage - One software for aviation IDA / D3850 Post Open - National 100,000.00 0.00 Implementati 2021-03-12 2021-05-25 2021-08-25 Provision Quotations Envelope personnel (CAA) on CARS3/SH/G/02 / Accident Pending Aviation Safety and Service Request for Single Stage - One investigation and aerodrome IDA / D3850 Post Open - National 80,000.00 0.00 Implementati 2021-03-12 2021-05-25 2021-07-26 Provision Quotations Envelope certification equipment (CAA) on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARS-3/CS-FBS-01 / CS for preparation of Feasibility Studies and Technical Designs for the modernization and Regional Connections, rehabilitation of Karakol and Associated Facilities and Fixed Budget / Prior Open - International 520,000.00 0.00 Canceled 2017-04-01 2017-04-01 2017-04-20 2017-04-28 2017-08-24 2017-05-26 2017-10-09 2017-06-02 2017-12-08 2017-06-19 2017-07-03 2017-12-29 Issyk-Kul Intnl Airports, Equipment in Issyk-Kul Selection including preparation of Oblast tender documents for infrastructure and equipment, finalization of safeguard docs CARS3/CS/LCS/01 / Project Project Management and Least Cost IDA / D3850 Post Open - International 100,000.00 70,224.00 Signed 2020-05-10 2020-10-30 2020-05-31 2020-12-15 2020-07-14 2021-01-22 2020-08-11 2021-02-19 2020-09-10 2021-03-09 2020-10-15 2021-03-16 2020-11-19 2021-03-19 2021-05-18 audit Implementation Selection CARS3/CS/CQS/03 / Regional Connections, Consulting Services for review Consultant Associated Facilities and of detailed design and IDA / D3850 Prior Qualification Open - International 500,000.00 499,573.75 Signed 2020-05-04 2020-06-01 2020-05-04 2020-06-09 2020-07-01 2020-10-15 2020-07-31 2020-12-05 2020-08-05 2020-12-09 2021-01-02 Equipment in Issyk-Kul preparation of tender Selection Oblast documents _Tyup_Kegen road CARS3/CS/QCBS/01 / Regional Connections, Consulting Services for Associated Facilities and Quality And Cost- Pending IDA / D3850 Prior Open - International 2,400,000.00 0.00 2021-03-10 2021-04-01 2021-05-30 2021-07-09 2021-08-08 2021-09-12 2021-10-12 2022-10-12 construction supervision of Equipment in Issyk-Kul Based Selection Implementation Tyup-Kegen road Oblast CARS3/CS/QCBS/03 / Aviation Safety and Service Quality And Cost- Institutional review and state IDA / D3850 Prior Open - International 550,000.00 0.00 Under Review 2021-03-24 2021-06-20 2021-03-31 2021-06-24 2021-05-14 2021-07-09 2021-08-08 2021-09-12 2021-10-24 2022-04-24 Provision Based Selection safety program Page 1 CARS3/CS/QCBS/05 / Aviation Safety and Service Quality And Cost- Pending Monitoring software for IDA / D3850 Post Open - International 400,000.00 0.00 2021-09-16 2021-09-30 2021-11-18 2021-12-16 2022-01-15 2022-02-19 2022-04-04 2022-10-01 Provision Based Selection Implementation airmen and aviation personnel CARS/3/CS/CQS/01 / Consultant Consulting Services for review Aviation Safety and Service Under IDA / D3850 Post Qualification Open - National 130,000.00 0.00 2021-04-30 2021-06-17 2021-05-21 2021-06-25 2021-07-04 2021-08-03 2021-09-24 2021-12-24 of education program and Provision Implementation Selection capacity building (KAI) CARS3/CS/QCBS/04 / Aviation Safety and Service Quality And Cost- IDA / D3850 Prior Open - International 400,000.00 0.00 Under Review 2021-04-30 2021-05-21 2021-07-04 2021-08-01 2021-08-31 2021-10-05 2021-11-01 2022-04-30 Drafting aviation rules Provision Based Selection CARS3/CS/QCBS/02 / Consulting Services for Sustainable Tourism Quality And Cost- sustainable tourism IDA / D3850 Development in Issyk-Kul Prior Open - International 1,500,000.00 0.00 Canceled 2019-10-01 2019-10-22 2019-12-05 2020-01-02 2020-02-01 2020-03-07 2020-04-11 2021-04-11 Based Selection development,geoparks, Oblast statistics satellites CARS3/CS/CQS/02 / Sustainable Tourism Consultant Consulting Services for design IDA / 63280 Development in Issyk-Kul Post Qualification Open - National 60,000.00 0.00 Canceled 2019-04-10 2020-12-10 2019-05-01 2019-06-14 2019-07-14 2019-08-18 2020-02-14 supervision for tourist centers Oblast Selection CARS3/CS/QCBS/02/1 / Consulting Services for Development of a Sustainable Tourism Strategy and Masterplan, including Sustainable Tourism Quality And Cost- Under preparation of two local IDA / D3850 Development in Issyk-Kul Prior Open - International 1,080,000.00 0.00 2021-04-06 2021-06-16 2021-04-27 2021-06-23 2021-06-10 2021-07-08 2021-08-07 2021-09-11 2021-10-16 2022-10-16 Based Selection Implementation development plans for Aksuu Oblast and Tyup districts (concept development of geoparks) in Issyk-Kul Oblast, as well as strategic environment CARS3/CS/CQS/02/1 / Sustainable Tourism Consultant Consulting Services for design Under IDA / 63280 Development in Issyk-Kul Post Qualification Open - National 70,000.00 0.00 2019-04-10 2021-06-21 2019-05-01 2019-06-14 2019-07-14 2019-08-18 2020-02-14 and author supervision for Implementation Oblast Selection tourist centers CARS3/CS/QCBS/06 / Consulting Services for the Sustainable Tourism Development and Pilot Quality And Cost- IDA / D3850 Development in Issyk-Kul Prior Open - International 420,000.00 0.00 Under Review 2021-05-10 2021-05-31 2021-07-14 2021-08-11 2021-09-10 2021-10-15 2021-11-19 2022-11-19 Application of Tourism Based Selection Oblast Satellite Account (TSA) for the Issyk-Kul Oblast INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CARS3/CS/IC/01 / Sustainable Tourism Individual Consulting Services for Pending IDA / D3850 Development in Issyk-Kul Post Consultant Open 36,000.00 0.00 2021-10-15 2021-12-03 2021-12-24 2022-01-24 2022-07-23 construction supervision Implementation Oblast Selection tourist centers CARS3/CS/IC/02 / Consulting Services for Individual Aviation Safety and Service Pending technical supervision for IDA / D3850 Post Consultant Open 10,000.00 0.00 2021-04-30 2021-06-18 2021-07-02 2021-07-23 2022-01-19 Provision Implementation rehabilitation of current Selection buildings and facilities of KAI CARS3/CS/SSS/01 / Sustainable Tourism Consulting Services for author IDA / D3850 Development in Issyk-Kul Post Direct Selection Direct 10,000.00 0.00 Canceled 2019-04-15 2019-04-25 2019-06-29 2019-12-26 supervision for tourist centers Oblast Page 2 PROCUREMENT PLAN (Textual Part) Project information: Burkina Faso, Livestock Sector Development Support Project-P159476 Project Implementation agency: Livestock Sector Development Support Project Date of the Procurement Plan: January 16th, 2018 Period covered by this Procurement Plan: from January to December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in LOI N°039-2016/ AN PORT ANT REGLEMENT ATION GENERALE DE LA COMMANDE PUBLIQUE, When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable; Works: is not applicable PROCUREMENT Burkina Faso : Burkina Faso Livestock Sector Development Support Project PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2018-01-16 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159476 GPN Date: 2018-01-09 Project Name: Burkina Faso Livestock Sector Development Support Project Loan / Credit No: IDA / 61150 P Executing Agency(ies): rojet d'Appui au Développement du secteur de l'Elevage au Burkina Faso WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BF-PADEL-B-93149-CW-RFB / Construction de treize (13) Component 1: Improved Single Stage - One 3,279,216.3 2020-06- postes vétérinaires et de IDA / 61150 Post Request for Bids Open - National 3,326,299.00 Signed 2019-10-18 2020-03-06 2019-10-23 2019-11-22 2020-05-04 2019-11-29 2020-05-20 2019-12-27 2020-07-26 Access to Services and Inputs Envelope 4 24 trente-cinq (35) parcs de vaccination BF-PADEL-B-161259-CW- RFQ / Travaux de réalisation de forages dans huit (08) Component 1: Improved Request for Single Stage - One 2020-08- IDA / 61150 Post Limited 115,966.00 117,522.26 Signed 2020-04-08 2020-03-24 2020-05-20 2020-06-02 postes vétérinaires à Access to Services and Inputs Quotations Envelope 18 construire dans des communes BF-PADEL-B-163380-CW- RFQ / Travaux de Component 1: Improved Request for Single Stage - One 2020-12- construction du local du IDA / 61150 Post Limited 166,090.00 213,106.38 Signed 2020-05-05 2020-07-13 2020-06-30 2020-09-01 Access to Services and Inputs Quotations Envelope 27 générateur d'azote liquide et l'aménagement de la taurellerie au profit du CMAP BF-PADEL-B-182225-CW- RFQ / Travaux de Component 1: Improved Request for Single Stage - One 2021-03- IDA / 61150 Post Limited 167,241.00 183,727.24 Signed 2020-08-02 2020-07-13 2020-09-06 2020-09-17 construction du poste Access to Services and Inputs Quotations Envelope 05 vétérinaire de Gorom-Gorom BF-PADEL-B-93147-CW-RFB Pending / Travaux de réhabilitation du Component 1: Improved Single Stage - One 2021-10- IDA / 61150 Post Request for Bids Open - National 689,655.00 0.00 Implementat 2021-02-23 2021-02-28 2021-03-30 2021-04-06 2021-05-04 laboratoire régional de Bobo- Access to Services and Inputs Envelope 31 ion Dioulasso BF-PADEL-B-93151-CW-RFB Pending Component 1: Improved Single Stage - One 2021-03- / Travaux de construction de IDA / 61150 Post Request for Bids Open - National 3,867,837.00 0.00 Implementat 2020-12-24 2020-12-29 2021-01-28 2021-02-04 2021-03-04 Access to Services and Inputs Envelope 24 la CAMVET ion BF-PADEL-B-208160-CW- RFB / Réalisation de 53 Parcs Pending Component 1: Improved Single Stage - One 2022-02- de vaccinations et travaux de IDA / 61150 Post Request for Bids Open - National 4,238,960.00 0.00 Implementat 2021-05-24 2021-05-29 2021-06-28 2021-07-28 2021-09-01 Access to Services and Inputs Envelope 28 Construction de 19 postes ion vétérinaires BF-PADEL-B-208161-CW- Pending Component 1: Improved Request for Single Stage - One 2022-01- RFQ / Construction d'une IDA / 61150 Post Limited 86,207.00 0.00 Implementat 2021-06-01 2021-07-27 Access to Services and Inputs Quotations Envelope 23 verraterie au profit de CMAP ion BF-PADEL-B-217026-CW- RFB / Travaux de Pending Component 1: Improved Single Stage - One 2022-03- réhabilitation d'un marché à IDA / 61150 Post Request for Bids Open - National 213,793.00 0.00 Implementat 2021-05-13 2021-05-18 2021-06-29 2021-07-29 2021-09-02 Access to Services and Inputs Envelope 01 bétail pour le compte du ion PADEL-B BF-PADEL-B-93150-CW-RFB / Construction de parcs de Component 1: Improved Single Stage - One 2020-06- IDA / 61150 Post Request for Bids Open - National 603,000.00 0.00 Canceled 2019-10-18 2019-10-23 2019-11-22 2019-11-29 2019-12-27 vaccination pour petits Access to Services and Inputs Envelope 24 ruminants Request for Bids - BF-PADEL-B-232994-CW- Pending Component 1: Improved Single Stage - One Small Works SPD 2022-04- RFB / Travaux de réalisation IDA / 61150 Post Request for Bids Limited 1,277,586.00 0.00 Implementat 2021-06-18 2021-06-23 2021-08-04 2021-09-03 2021-10-08 Access to Services and Inputs Envelope (1 envelope 06 de 39 parcs de vaccination ion process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PADEL-B-43482-GO-UN Component 1: Improved UN Agencies IDA / 61150 Post Direct 1,054,310.00 576,227.00 Completed 2018-01-18 2018-01-23 2018-01-04 2018-03-06 2018-02-09 2018-07-04 2018-07-12 / Véhicules 2 roues et 4 roues Access to Services and Inputs (Direct) BF-PADEL-B-43475-GO-RFB Component 3: Crisis Single Stage - One / Matériel informatique et péri IDA / 61150 Management and Project Post Request for Bids Limited 1,888,280.00 246,297.71 Completed 2018-02-15 2018-04-25 2018-02-20 2018-05-07 2018-04-03 2018-05-25 2018-05-03 2018-05-25 2018-06-07 2018-09-12 2018-12-04 2019-05-08 Envelope informatiques C3 Coordination BF-PADEL-B-43476-GO-RFQ Component 3: Crisis Request for Single Stage - One / Equipement de IDA / 61150 Management and Project Post Limited 15,517.00 21,230.47 Completed 2018-03-06 2018-08-10 2018-04-03 2018-10-04 2018-05-18 2018-10-24 Quotations Envelope communication Coordination BF-PADEL-B-43479-GO-RFQ Component 3: Crisis Request for Single Stage - One / Mobilier de bureau pour IDA / 61150 Management and Project Post Open - National 65,000.00 34,234.30 Completed 2018-02-05 2018-04-02 2018-05-25 2018-05-17 2018-06-01 Quotations Envelope l'UCP et SE terrain Coordination BF-PADEL-B-43487-GO-RFB Component 1: Improved Single Stage - One IDA / 61150 Post Request for Bids Open - National 705,259.00 671,655.81 Completed 2018-09-27 2018-04-12 2018-10-02 2018-11-13 2018-05-28 2018-12-13 2018-06-07 2019-01-17 2018-09-17 2019-04-17 2019-11-23 / Kits de démonstration Access to Services and Inputs Envelope BF-PADEL-B-43477-GO-RFB / Appui à la vaccination et Component 1: Improved Single Stage - One IDA / 61150 Post Request for Bids Open - National 745,517.00 0.00 Canceled 2019-03-22 2019-03-27 2019-05-08 2019-06-07 2019-07-12 2019-10-10 équipement de Access to Services and Inputs Envelope reconditionnement de vaccins Component 3: Crisis BF-PADEL-B-43495-GO-RFQ Request for Single Stage - One IDA / 61150 Management and Project Post Limited 15,517.00 17,284.10 Completed 2018-02-05 2018-01-25 2018-03-26 2018-03-16 2018-04-25 2018-03-30 / Equipement DMP MRAH Quotations Envelope Coordination Page 1 BF-PADEL-B-43488-GO-RFQ Component 3: Crisis Request for Single Stage - One / Fournitures de bureau et IDA / 61150 Management and Project Post Open - National 51,207.00 33,988.45 Completed 2018-03-05 2018-05-07 2018-09-12 2019-05-02 2018-10-25 Quotations Envelope consommables informatiques Coordination BF-PADEL-B-59179-GO-DIR Component 1: Improved IDA / 61150 Post Direct Selection Direct 120,689.00 112,355.46 Completed 2018-04-13 2018-04-23 2018-05-21 2018-05-17 2018-06-11 2018-06-16 2018-06-19 / Semences fourragères Access to Services and Inputs BF-PADEL-B-43485-GO-RFB Component 1: Improved Single Stage - One IDA / 61150 Post Request for Bids Limited 325,862.00 0.00 Canceled 2018-10-21 2018-10-26 2018-12-07 2019-01-06 2019-02-10 2019-08-09 / Semences fourragères Access to Services and Inputs Envelope BF-PADEL-B-60095-GO-RFQ Component 3: Crisis Under Request for Single Stage - One / Mobilier de bureau pour IDA / 61150 Management and Project Post Limited 65,000.00 0.00 Implementati 2018-05-02 2018-04-23 2018-05-27 2018-06-17 Quotations Envelope l'UCP et SE terrain Coordination on BF-PADEL-B-60110-GO-DIR Component 3: Crisis / Acquisition, installation, IDA / 61150 Management and Project Post Direct Selection Direct 44,827.00 44,695.62 Signed 2018-04-29 2018-06-05 2018-05-04 2018-06-08 2018-05-11 2018-10-29 2018-06-10 paramétrage et formation sur Coordination le logiciel TOMPRO BF-PADEL-B-60880-GO-DIR Component 3: Crisis Request for Single Stage - One / Acquisition d'un groupe IDA / 61150 Management and Project Post Limited 25,900.00 25,536.15 Completed 2018-05-20 2018-05-14 2018-07-08 2018-05-31 2018-08-07 2018-07-06 Quotations Envelope électrogène Coordination BF-PADEL-B-60798-GO-RFQ Component 3: Crisis / Acquisition 3 véhicules pic Request for Single Stage - One IDA / 61150 Management and Project Post Limited 156,900.00 154,548.92 Completed 2018-05-22 2018-06-14 2018-07-10 2018-10-17 2018-08-24 2019-02-14 up double cabine +1 véhicule Quotations Envelope Coordination de tourisme BF-PADEL-B-69320-GO-RFQ Component 3: Crisis / Acquisition de Request for Single Stage - One IDA / 61150 Management and Project Post Limited 32,758.62 61,231.18 Completed 2018-09-25 2018-09-26 2018-10-30 2018-11-05 2018-11-20 2018-12-14 photocopieurs au profit du Quotations Envelope Coordination PADEL-B BF-PADEL-B-93152-GO-DIR / Acquisition de matériel Component 1: Improved roulant (4 véhicules 4x4 pick- IDA / 61150 Post Direct Selection Direct 233,000.00 233,000.00 Signed 2019-02-08 2019-04-03 2019-02-13 2019-04-05 2019-03-06 2019-05-06 2019-09-02 Access to Services and Inputs up double cabine et 1 véhicule 4x4 station wagon) BF-PADEL-B-93153-GO-RFQ Component 1: Improved Request for Single Stage - One / Acquisition d'un véhicule de IDA / 61150 Post Limited 34,000.00 29,016.94 Completed 2019-03-23 2019-01-14 2019-05-11 2019-01-31 2019-06-25 2019-03-07 Access to Services and Inputs Quotations Envelope tourisme BF-PADEL-B-93154-GO-RFB Component 3: Crisis / Acquisition de matériel Single Stage - One IDA / 61150 Management and Project Post Request for Bids Open - National 110,000.00 104,538.15 Completed 2019-03-12 2019-04-29 2019-03-17 2019-04-16 2019-06-25 2019-04-23 2019-07-19 2019-05-21 2019-10-29 2019-07-20 2019-12-06 informatique et péri- Envelope Coordination informatique BF-PADEL-B-93161-GO-RFB Under Component 1: Improved Single Stage - One / Acquisition de générateur IDA / 61150 Post Request for Bids Open - National 339,000.00 0.00 Implementati 2019-05-10 2020-02-10 2019-05-15 2019-06-14 2020-03-27 2019-06-21 2020-05-26 2019-07-19 2019-10-17 Access to Services and Inputs Envelope d'azote liquide on BF-PADEL-B-93162-GO-RFB / Acquisition de glacières et Component 1: Improved Single Stage - One frigo solaires dans le cadre du IDA / 61150 Post Request for Bids Open - National 362,000.00 332,749.02 Signed 2019-03-19 2019-06-07 2019-03-24 2019-04-23 2019-07-29 2019-04-30 2019-10-07 2019-05-28 2019-12-12 2019-08-26 Access to Services and Inputs Envelope développement de la chaîne de froid BF-PADEL-B-93168-GO-RFQ Component 1: Improved Request for Single Stage - One / Acquisition de fournitures et IDA / 61150 Post Limited 23,000.00 22,828.78 Completed 2019-03-23 2019-09-02 2019-04-27 2019-09-09 2019-05-27 2019-09-12 Access to Services and Inputs Quotations Envelope consommables BF-PADEL-B-75638-GO-RFQ / Acquisition et installation Component 3: Crisis Request for Single Stage - One d'équipement de IDA / 61150 Management and Project Post Open - National 51,724.00 0.00 Canceled 2018-09-22 2018-11-27 2018-12-27 Quotations Envelope visioconférence au profit du Coordination PADEL-B BF-PADEL-B-43492-GO-RFB Component 1: Improved Single Stage - One / Broyeurs d'aliments pour IDA / 61150 Post Request for Bids Open - National 310,345.00 0.00 Canceled 2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-10-10 Access to Services and Inputs Envelope bétail BF-PADEL-B-93159-GO-DIR / Acquisition de semences Component 1: Improved Single Stage - One IDA / 61150 Post Request for Bids Open - National 155,000.00 0.00 Canceled 2019-01-24 2019-01-29 2019-02-28 2019-03-07 2019-04-04 2019-05-19 fourragères certifiées et de Access to Services and Inputs Envelope fertilisant (biodigesteur) BF-PADEL-B-104204-GO- Component 3: Crisis RFQ / Acquisition de Request for Single Stage - One IDA / 61150 Management and Project Post Limited 120,689.00 114,701.11 Completed 2019-03-20 2019-03-14 2019-05-04 2019-04-24 2019-06-03 2019-05-28 semences fourragères Quotations Envelope Coordination certifiées BF-PADEL-B-113340-GO- DIR / Acquisition, installation Component 3: Crisis Pending et configuration de clés et site IDA / 61150 Management and Project Post Direct Selection Direct 23,463.00 0.00 Implementati 2019-05-13 2019-05-18 2019-06-08 2019-08-07 supplémentaires du logiciel Coordination on Tompro au profit du PADEL-B BF-PADEL-B-119593-GO- RFQ / Acquisition Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 34,310.00 0.00 Canceled 2019-07-06 2019-08-24 2019-09-23 d'équipements de vaccination Access to Services and Inputs Quotations Envelope pour le compte du PADEL-B BF-PADEL-B-123445-GO- RFQ / Acquisition de déparasitants et de Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 72,414.00 82,129.13 Signed 2019-09-04 2019-10-28 2019-10-30 2020-02-24 2019-11-29 désinfectants pour l'élevage Access to Services and Inputs Quotations Envelope de porcs au profit de la DGSV pour le compte du PADEL-B BF-PADEL-B-93156-GO-DIR / Acquisition de vaccins contre la PPCB (6 000 000 de doses dont 2 000 000 de doses pour l'année 2019), de Component 1: Improved Single Stage - Two IDA / 61150 Post Request for Bids Open - International 801,723.00 0.00 Canceled 2019-04-25 2019-06-14 2019-06-29 2019-04-30 2019-08-13 2019-10-26 2019-11-30 2021-11-19 vaccins contre la variole Access to Services and Inputs Envelope aviaire (15 000 000 de doses dont 3 000 000 pour 2019), et de vaccins contre la FA (50 000 doses) Page 2 BF-PADEL-B-123711-GO- DIR / Acquisition de vaccins Component 1: Improved contre la Variole Aviaire (VA) IDA / 61150 Post Direct Selection Direct 155,172.00 65,405.47 Signed 2019-10-31 2020-02-04 2019-11-10 2020-02-11 2019-12-29 2020-03-31 2020-06-26 Access to Services and Inputs (15 millions de doses dont 3 millions de doses en 2020) BF-PADEL-B-123708-GO- DIR / Acquisition de vaccins Component 1: Improved contre la PPCB (3 millions de IDA / 61150 Post Direct Selection Direct 517,241.00 1,175,771.65 Signed 2019-10-31 2019-11-29 2019-11-14 2020-01-20 2019-12-20 2020-03-18 2020-06-17 Access to Services and Inputs doses en 2019 et 3 millions de doses en 2020) BF-PADEL-B-135401-GO- DIR / Acquisition de vaccins contre la Peste des Petits Component 1: Improved IDA / 61150 Post Direct Selection Direct 948,276.00 528,480.78 Signed 2019-10-31 2019-11-28 2019-11-14 2020-01-20 2020-01-02 2020-03-18 2020-06-30 Ruminants (PPR) (11 millions Access to Services and Inputs de doses dont 5 millions de doses en 2020) BF-PADEL-B-135402-GO- RFQ / Acquisition de mobilier Component 3: Crisis Request for Single Stage - One de bureau au profit du IDA / 61150 Management and Project Post Limited 25,862.00 24,815.18 Completed 2019-10-29 2019-10-04 2019-12-24 2019-11-06 2020-01-23 2019-12-02 Quotations Envelope personnel complémentaire du Coordination PADEL-B BF-PADEL-B-135408-GO- RFB / Acquisition Component 1: Improved Single Stage - One IDA / 61150 Post Request for Bids Open - National 120,700.00 98,029.96 Signed 2019-10-30 2019-11-25 2019-11-29 2019-12-29 2020-01-14 2020-01-05 2020-01-24 2020-02-09 2020-03-13 2020-03-10 d'équipements de vaccination Access to Services and Inputs Envelope pour le compte du PADEL-B BF-PADEL-B-43484-GO-RFB Component 1: Improved Single Stage - One IDA / 61150 Post Request for Bids Limited 801,724.00 0.00 Canceled 2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-09-10 / Vaccins PPCB, VA et FA Access to Services and Inputs Envelope BF-PADEL-B-144346-GO- RFQ / Acquisition de tablettes/Smartphones et de Component 3: Crisis Request for Single Stage - One GPS pour la géo-capacitation IDA / 61150 Management and Project Post Limited 14,310.00 13,729.40 Completed 2019-11-28 2019-11-11 2019-12-22 2019-11-27 2020-01-05 2019-12-03 Quotations Envelope du système de suivi- Coordination évaluation du PADEL-B avec KoBo ToolBox BF-PADEL-B-155820-GO- Pending Component 1: Improved Request for Single Stage - One RFQ / Acquisition de kits IDA / 61150 Post Limited 86,000.00 0.00 Implementati 2020-08-13 2020-09-17 2020-11-16 Access to Services and Inputs Quotations Envelope d'inséminateur pour porcs on BF-PADEL-B-155821-GO- Component 3: Crisis Request for Single Stage - One RFQ / Acquisition d'un IDA / 61150 Management and Project Post Limited 59,689.00 62,199.82 Signed 2020-04-13 2020-07-07 2020-05-18 2020-08-26 2020-07-17 Quotations Envelope véhicule 4x4 station wagon Coordination BF-PADEL-B-155826-GO- Component 3: Crisis RFQ / Acquisition de Request for Single Stage - One IDA / 61150 Management and Project Post Limited 28,000.00 28,404.73 Completed 2020-03-12 2020-04-06 2020-04-16 2020-04-24 2020-05-16 2020-04-27 fournitures de bureau et de Quotations Envelope Coordination produits d'entretien BF-PADEL-B-156025-GO- Component 3: Crisis Request for Single Stage - One RFQ / Acquisition de IDA / 61150 Management and Project Post Limited 21,000.00 20,686.68 Signed 2020-04-14 2020-04-06 2020-05-19 2020-04-24 2020-06-02 Quotations Envelope consommables informatiques Coordination BF-PADEL-B-161202-GO- RFQ / Conception/réalisation Component 3: Crisis Pending de 4 kakémonos thématiques Request for Single Stage - One IDA / 61150 Management and Project Post Limited 11,655.00 0.00 Implementati 2020-05-25 2020-07-06 2020-08-05 et production d'un kit d'outils Quotations Envelope Coordination on de communication par l'objet au profit du PADEL-B BF-PADEL-B-161207-GO- RFQ / Confection et livraison Component 2: Livestock Request for Single Stage - One IDA / 61150 Post Limited 33,620.00 36,096.35 Signed 2020-05-07 2020-06-18 2020-06-25 2020-07-08 2020-07-25 de panneaux d'identification Value Chain Development Quotations Envelope des micro-projets BF-PADEL-B-161262-GO- Component 3: Crisis RFQ / Acquisition de mobilier Request for Single Stage - One IDA / 61150 Management and Project Post Limited 5,172.00 5,154.43 Completed 2020-04-20 2020-04-21 2020-06-01 2020-05-07 2020-07-01 2020-06-10 de bureau au profit du Quotations Envelope Coordination SP/CVEL BF-PADEL-B-123705-GO- Component 1: Improved DIR / Acquisition de vaccins IDA / 61150 Post Direct Selection Direct 948,276.00 0.00 Canceled 2019-09-04 2019-09-09 2019-10-14 2020-04-11 Access to Services and Inputs contre la PPR BF-PADEL-B-93164-GO-RFB Component 1: Improved Single Stage - One / Acquisition de réactifs IDA / 61150 Post Request for Bids Open - National 81,000.00 0.00 Canceled 2019-05-17 2019-05-22 2019-06-21 2019-06-28 2019-07-26 2019-09-24 Access to Services and Inputs Envelope contre la FA, PPA et PPR BF-PADEL-B-93157-GO-RFB / Acquisition de matériel et Component 1: Improved Single Stage - One d'équipement d'appui à la IDA / 61150 Post Request for Bids Open - National 443,000.00 0.00 Canceled 2019-03-08 2019-03-13 2019-04-12 2019-04-19 2019-05-17 2019-08-15 Access to Services and Inputs Envelope vaccination et à la conservation BF-PADEL-B-93167-GO-RFQ / Acquisition de Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 10,000.00 0.00 Canceled 2019-03-23 2019-04-27 2019-05-27 consommables pour 6 Access to Services and Inputs Quotations Envelope laboratoires satellites BF-PADEL-B-163372-GO- Component 1: Improved Single Stage - One RFB / Acquisition d'hormones IDA / 61150 Post Request for Bids Limited 137,931.00 106,948.35 Signed 2020-05-21 2020-05-27 2020-05-26 2020-06-25 2020-06-25 2020-07-27 2020-07-02 2020-08-17 2020-08-06 2020-10-21 2020-11-04 Access to Services and Inputs Envelope et de paillettes BF-PADEL-B-163378-GO- RFB / Acquisition de Component 1: Improved Single Stage - One IDA / 61150 Post Request for Bids Limited 138,000.00 0.00 Canceled 2020-03-23 2020-03-28 2020-04-27 2020-05-04 2020-06-08 2020-07-08 semences fourragères Access to Services and Inputs Envelope certifiées BF-PADEL-B-167066-GO- RFQ / Acquisition de Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 138,000.00 120,491.29 Signed 2020-04-15 2020-04-21 2020-05-20 2020-04-30 2020-06-19 semences fourragères Access to Services and Inputs Quotations Envelope certifiées Page 3 BF-PADEL-B-171030-GO- Component 3: Crisis DIR / Acquisition de masque IDA / 61150 Management and Project Post Direct Selection Direct 4,138.00 3,486.00 Signed 2020-05-11 2020-04-22 2020-05-16 2020-04-29 2020-06-20 2020-05-04 2020-07-20 artisanal dans le cadre de la Coordination riposte contre le COVID 19 BF-PADEL-B-171031-GO- DIR / Acquisition de masque Component 3: Crisis industriel chirurgical jetable IDA / 61150 Management and Project Post Direct Selection Direct 4,310.00 4,679.42 Completed 2020-05-11 2020-04-22 2020-05-16 2020-05-07 2020-06-20 2020-05-15 2020-07-20 2020-06-23 dans le cadre de la riposte Coordination contre le COVID 19 BF-PADEL-B-171034-GO- RFQ / Acquisition de lave- Component 3: Crisis Request for Single Stage - One main artisanal dans le cadre IDA / 61150 Management and Project Post Limited 16,379.00 18,044.94 Signed 2020-05-09 2020-04-29 2020-07-04 2020-07-02 2020-07-25 Quotations Envelope de la riposte contre le COVID Coordination 19 BF-PADEL-B-171036-GO- RFQ / Acquisition de savon, Component 3: Crisis spray hydro alcoolique et de Request for Single Stage - One IDA / 61150 Management and Project Post Limited 33,621.00 34,234.26 Signed 2020-05-09 2020-04-29 2020-07-04 2020-05-04 2020-07-18 gel hydro alcoolique dans le Quotations Envelope Coordination cadre de la riposte contre le COVID 19 BF-PADEL-B-171029-GO- Component 3: Crisis DIR / Acquisition de masque IDA / 61150 Management and Project Post Direct Selection Direct 12,672.00 19,600.60 Signed 2020-05-11 2020-04-22 2020-05-16 2020-04-29 2020-06-20 2020-05-04 2020-07-20 lavable dans le cadre de la Coordination riposte contre le COVID 19 BF-PADEL-B-182217-GO- RFB / Acquisition de trousses Component 1: Improved Single Stage - One vétérinaires au profit de la IDA / 61150 Post Request for Bids Open - National 172,414.00 138,389.07 Signed 2020-08-31 2020-07-21 2020-09-05 2020-10-05 2020-09-11 2020-10-19 2020-10-13 2020-11-23 2020-12-30 2021-02-21 Access to Services and Inputs Envelope DGSV pour le compte du PADEL-B BF-PADEL-B-182218-GO- Pending RFB / Acquisition de glacières Component 1: Improved Single Stage - One IDA / 61150 Post Request for Bids Open - National 129,310.00 0.00 Implementati 2020-09-30 2020-10-05 2020-11-04 2020-11-18 2020-12-23 2021-03-23 médicales pour le compte du Access to Services and Inputs Envelope on PADEL-B BF-PADEL-B-123709-GO- Pending DIR / Acquisition de vaccins Component 1: Improved IDA / 61150 Post Direct Selection Direct 344,828.00 0.00 Implementati 2019-10-31 2019-11-14 2020-01-02 2020-06-30 contre la Fièvre Aphteuse (FA) Access to Services and Inputs on (100 000 doses) BF-PADEL-B-208168-GO- Pending DIR / Acquisition de 6 millions Component 1: Improved IDA / 61150 Post Direct Selection Direct 317,497.00 0.00 Implementati 2021-07-30 2021-08-04 2021-09-08 2022-03-07 de doses de vaccins contre la Access to Services and Inputs on PPR BF-PADEL-B-208169-GO- Pending Component 1: Improved Request for Single Stage - One RFQ / Acquisition de IDA / 61150 Post Limited 198,276.00 0.00 Implementati 2021-03-02 2021-04-27 2021-05-27 Access to Services and Inputs Quotations Envelope semences fourragère on certifiées BF-PADEL-B-208170-GO- Pending Component 1: Improved Request for Single Stage - One RFQ / Acquisition de paillettes IDA / 61150 Post Limited 51,724.00 0.00 Implementati 2021-02-23 2021-04-20 2021-07-19 Access to Services and Inputs Quotations Envelope au profit du CMAP on BF-PADEL-B-208171-GO- Pending RFQ / Acquisition de kits Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 43,103.00 0.00 Implementati 2021-05-03 2021-06-28 2021-09-26 d’insémination bovins au Access to Services and Inputs Quotations Envelope on profit du CMAP BF-PADEL-B-208172-GO- Component 3: Crisis Pending Request for Single Stage - One RFQ / Acquisition de IDA / 61150 Management and Project Post Limited 81,034.00 0.00 Implementati 2021-03-02 2021-04-27 2021-07-26 Quotations Envelope conteneurs de stockage Coordination on BF-PADEL-B-208173-GO- Component 3: Crisis Pending RFQ / Acquisition de matériel Request for Single Stage - One IDA / 61150 Management and Project Post Limited 34,000.00 0.00 Implementati 2021-03-01 2021-04-26 2021-06-25 informatique et péri- Quotations Envelope Coordination on informatique BF-PADEL-B-93165-GO-RFQ Component 1: Improved Request for Single Stage - One / Acquisition de géniteurs de IDA / 61150 Post Limited 12,000.00 0.00 Canceled 2019-03-23 2019-05-04 2019-06-18 Access to Services and Inputs Quotations Envelope poisson BF-PADEL-B-155816-GO- RFQ / Acquisition d'aliment Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 9,052.00 0.00 Canceled 2020-05-04 2020-06-08 2020-07-08 pour poisson (entretien des Access to Services and Inputs Quotations Envelope géniteurs) BF-PADEL-B-93166-GO-RFQ Component 1: Improved Request for Single Stage - One / Confection de registres de IDA / 61150 Post Limited 18,000.00 0.00 Canceled 2019-03-23 2019-04-27 2019-05-27 Access to Services and Inputs Quotations Envelope consignation BF-PADEL-B-43483-GO-RFB Component 1: Improved Single Stage - One / Consommables de IDA / 61150 Post Request for Bids Limited 99,138.00 0.00 Canceled 2019-06-25 2019-06-30 2019-07-30 2019-08-13 2019-09-17 2019-12-16 Access to Services and Inputs Envelope laboratoires BF-PADEL-B-183482-GO- RFB / Acquisition de boîtes à Component 1: Improved Single Stage - One images et d'affiches pour la IDA / 61150 Post Request for Bids Open - National 121,034.00 0.00 Canceled 2020-09-10 2020-09-15 2020-10-15 2020-10-29 2020-11-26 2020-12-26 Access to Services and Inputs Envelope sensibilisation sur la PPR, la PPCB et la VA BF-PADEL-B-217030-GO- RFQ / Acquisition de Pending consommables de laboratoire Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 51,724.00 0.00 Implementati 2021-04-20 2021-06-15 2021-09-13 (Fièvre Aphteuse, Peste Access to Services and Inputs Quotations Envelope on Porcine Africaine) au profit de la DGSV BF-PADEL-B-217033-GO- Pending RFQ / Confection de boîtes à Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 68,966.00 0.00 Implementati 2021-03-23 2021-05-18 2021-07-02 images pour la campagne Access to Services and Inputs Quotations Envelope on contre la PPCB BF-PADEL-B-217036-GO- Pending RFQ / Confection de matériel Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 61,638.00 0.00 Implementati 2021-06-15 2021-08-10 2021-09-24 de sensibilisation campagne Access to Services and Inputs Quotations Envelope on variole aviaire Page 4 BF-PADEL-B-217046-GO- RFQ / Acquisition de réactifs au profit de la DGSV dans le cadre d'enquête sérologique Pending post-vaccinale et traitement Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 43,103.00 0.00 Implementati 2021-07-21 2021-09-15 2021-11-14 des données pour établir le Access to Services and Inputs Quotations Envelope on taux d'immunisation ainsi que l'appui au contrôle des résidus médicamenteux dans les produits animaux BF-PADEL-B-217049-GO- RFQ / Acquisition de verrats Pending Component 1: Improved Request for Single Stage - One (large white, landrace) IDA / 61150 Post Limited 13,793.00 0.00 Implementati 2021-07-18 2021-09-12 2021-11-11 Access to Services and Inputs Quotations Envelope performants au profit du on CMAP BF-PADEL-B-217055-GO- RFQ / Multiplication et Pending Component 1: Improved Request for Single Stage - One diffusion des fiches IDA / 61150 Post Limited 8,621.00 0.00 Implementati 2021-04-26 2021-06-21 2021-08-05 Access to Services and Inputs Quotations Envelope techniques simplifiées des on RTE BF-PADEL-B-217060-GO- Pending RFQ / Confection et livraison Component 2: Livestock Request for Single Stage - One IDA / 61150 Post Limited 24,138.00 0.00 Implementati 2021-05-25 2021-07-20 2021-09-18 de plaques indicatives des MP Value Chain Development Quotations Envelope on et AP BF-PADEL-B-217064-GO- Component 3: Crisis Pending Request for Single Stage - One RFQ / Réalisation de boites à IDA / 61150 Management and Project Post Limited 10,026.00 0.00 Implementati 2021-04-27 2021-06-22 2021-08-06 Quotations Envelope image sur le genre Coordination on BF-PADEL-B-217087-GO- RFQ / Acquisition de kits Component 3: Crisis Pending Request for Single Stage - One complémentaires au profit des IDA / 61150 Management and Project Post Limited 7,759.00 0.00 Implementati 2021-05-17 2021-07-12 2021-10-10 Quotations Envelope femmes bénéficiaires de kit Coordination on de biosécurité BF-PADEL-B-217089-GO- RFQ / Edition, impression et Component 3: Crisis Pending Request for Single Stage - One multiplication du guide des IDA / 61150 Management and Project Post Limited 12,069.00 0.00 Implementati 2021-04-26 2021-06-21 2021-07-21 Quotations Envelope bonnes pratiques de gestion Coordination on des déchets biomédicaux BF-PADEL-B-217092-GO- Component 3: Crisis Pending Request for Single Stage - One RFQ / Acquisition de plants et IDA / 61150 Management and Project Post Limited 33,621.00 0.00 Implementati 2021-04-28 2021-06-23 2021-07-23 Quotations Envelope de grilles de protection Coordination on BF-PADEL-B-217099-GO- RFQ / Acquisition de produits Component 3: Crisis Pending Request for Single Stage - One phytosanitaires et de polyter IDA / 61150 Management and Project Post Limited 33,621.00 0.00 Implementati 2021-04-28 2021-06-23 2021-07-23 Quotations Envelope pour les plantations de Coordination on compensation BF-PADEL-B-217108-GO- Pending RFQ / Reproduction de Component 1: Improved Request for Single Stage - One IDA / 61150 Post Limited 17,241.00 0.00 Implementati 2021-05-23 2021-07-18 2021-08-17 manuels et plans sur la Access to Services and Inputs Quotations Envelope on surveillance PPR BF-PADEL-B-217104-GO- Component 3: Crisis Request for Single Stage - One RFQ / Acquisition de matériel IDA / 61150 Management and Project Post Limited 8,621.00 0.00 Canceled 2021-03-24 2021-05-19 2021-06-18 Quotations Envelope de gestion pour la MGP Coordination BF-PADEL-B-232991-GO- RFQ / Acquisition de Component 3: Crisis Pending Request for Single Stage - One mobiliers de bureau pour IDA / 61150 Management and Project Post Limited 86,207.00 0.00 Implementati 2021-06-05 2021-07-31 2021-09-29 Quotations Envelope l'équipement de postes Coordination on vétérinaires (phase 1) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Crisis BF-PADEL-B-43494-NC-DIR IDA / 61150 Management and Project Post Direct Selection Direct 34,483.00 27,264.39 Completed 2018-02-15 2018-02-20 2018-05-25 2018-03-06 2018-05-31 2020-02-24 2018-07-24 / Assurance maladie Coordination BF-PADEL-B-43493-NC-RFQ / Matériels de sensibilisation pour les campagne de Component 1: Improved Request for Single Stage - One IDA / 61150 Post Open - National 41,379.00 0.00 Canceled 2018-04-20 2018-06-15 2018-12-12 vaccination contre la PPR, la Access to Services and Inputs Quotations Envelope variole aviaire, la NCD, la PPCB et la FA Component 3: Crisis BF-PADEL-B-43540-NC-DIR IDA / 61150 Management and Project Post Direct Selection Direct 20,690.00 0.00 Canceled 2018-04-02 2018-04-09 2018-05-03 2018-06-17 / Paramétrage Coordination BF-PADEL-B-43532-NC-DIR Component 2: Livestock IDA / 61150 Post Direct Selection Direct 275,862.00 0.00 Canceled 2018-01-30 2018-06-05 2018-02-13 2018-06-19 2018-04-03 2020-03-23 / MOD pour la composante 2 Value Chain Development CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Crisis BF-PADEL-B-43567-CS- Quality And Cost- Under IDA / 61150 Management and Project Post Open - National 51,724.00 0.00 2017-12-06 2017-12-06 2018-01-19 2018-02-16 2018-04-06 2018-03-16 2018-03-30 2018-05-04 2018-05-18 2018-06-17 QCBS / audit externe Based Selection Implementation Coordination Page 5 BF-PADEL-B-75182-CS- QCBS / Recrutement d'un MOD pour la construction/équipement de Component 3: Crisis la Centrale d'Achat de Quality And Cost- IDA / 61150 Management and Project Post Open - National 120,700.00 115,933.09 Signed 2018-08-31 2018-07-31 2018-09-21 2018-10-20 2019-03-08 2018-11-17 2019-07-16 2018-12-17 2019-08-29 2019-01-21 2019-09-11 2019-02-25 2019-10-21 2020-02-25 Médicaments Vétérinaires Based Selection Coordination (CAM/VET) et la réalisation/réhabilitation de diverses infrastructures au profit du PADEL-B BF-PADEL-B-75185-CS- QCBS / Recrutement d'un MOD pour la Component 3: Crisis Quality And Cost- réalisation/achèvement de IDA / 61150 Management and Project Post Open - National 370,700.00 297,911.98 Signed 2018-08-31 2018-07-19 2018-09-21 2018-11-05 2018-10-20 2019-02-01 2018-11-17 2019-06-07 2018-12-17 2019-07-16 2019-01-21 2019-09-19 2019-02-25 2019-10-21 2020-02-25 Based Selection postes vétérinaires, parcs de Coordination vaccination et de marchés à bétail au profit du PADEL-B BF-PADEL-B-43506-CS-UN / Component 2: Livestock UN Agencies Méthodologie d'élaboration IDA / 61150 Post Direct 186,897.00 186,897.00 Signed 2018-12-23 2019-03-07 2019-06-21 Value Chain Development (Direct) SP/PA BF-PADEL-B-93232-CS-FBS / Recrutement d'un consultant (bureau d'études/cabinet) pour les études architecturales et suivi - Component 1: Improved Fixed Budget Under contrôle des travaux de IDA / 61150 Post Open - National 24,000.00 0.00 2019-09-06 2020-08-20 2019-09-20 2019-10-11 2019-11-08 2019-11-15 2019-12-06 2019-12-27 2020-02-25 Access to Services and Inputs Selection Implementation réhabilitation du laboratoire régional de Bobo-Dioulasso, des marchés à bétail de Bobo- Dioula et Youba et du marché de poissons de Di BF-PADEL-B-43526-CS-QBS Component 3: Crisis Quality Based / Situation de référence du IDA / 61150 Management and Project Post Open - National 60,345.00 0.00 Canceled 2018-05-11 2018-06-01 2018-06-29 2018-07-02 2018-07-09 2018-07-23 2018-08-20 2018-10-04 Selection projet Coordination BF-PADEL-B-95172-CS-CDS / Conception et diffusion de sketch d'information/sensibilisation Consultant Component 2: Livestock sur les alliances productives IDA / 61150 Post Qualification Open - National 13,793.00 18,009.05 Completed 2019-02-21 2019-01-29 2019-03-07 2019-03-28 2019-03-07 2019-04-11 2019-03-18 2019-04-25 2019-03-25 2019-05-25 2019-05-10 Value Chain Development dans le cadre de la mise en Selection œuvre des chaînes de valeur des filières (Langue Mooré, Goulmancema et Fulfuldé) BF-PADEL-B-95699-CS-CQS / Conception et diffusion de sketch Consultant d'information/sensibilisation Component 2: Livestock IDA / 61150 Post Qualification Open - National 8,620.00 8,727.37 Completed 2019-02-21 2019-01-29 2019-03-07 2019-03-28 2019-02-22 2019-04-11 2019-03-18 2019-04-25 2019-03-25 2019-05-25 2019-05-10 sur les alliances productives Value Chain Development Selection dans le cadre de la mise en œuvre des chaînes de valeur des filières (Langue Dioula) BF-PADEL-B-106170-CS- CQS / Recrutement d'un Consultant (Cabinet) pour la Component 3: Crisis Consultant mise en place d'un système IDA / 61150 Management and Project Post Qualification Open - National 34,310.00 27,733.07 Completed 2019-04-29 2019-05-24 2019-05-20 2019-07-03 2019-10-14 2019-08-02 2019-10-15 2019-09-06 2019-11-14 2020-03-04 2020-04-23 moderne de gestion des Coordination Selection données statistiques sur les ressources animales et halieutiques BF-PADEL-B-118326-CS- QCBS / Recrutement d'un Component 3: Crisis auditeur externe pour l'audit Quality And Cost- IDA / 61150 Management and Project Post Open - National 51,724.00 72,335.25 Signed 2019-07-31 2019-06-19 2019-08-14 2019-09-04 2019-12-20 2019-10-02 2020-02-10 2019-10-09 2020-02-22 2019-10-30 2020-06-03 2019-11-20 2020-07-29 2020-01-04 des comptes des exercices Based Selection Coordination 2019, 2020 et 2021 du PADEL- B BF-PADEL-B-161921-CS- CQS / Recrutement d'un Consultant Component 1: Improved Under Consultant pour la réalisation IDA / 61150 Post Qualification Open - National 172,414.00 0.00 2020-04-23 2020-11-17 2020-05-14 2021-04-21 2020-06-27 2020-07-27 2020-08-10 2020-10-09 Access to Services and Inputs Implementation de l'étude de faisabilité d'une Selection unité de production de vaccin BF-PADEL-B-150350-CS- QBS / Recrutement d'un Component 1: Improved Quality Based Under consultant pour le suivi- IDA / 61150 Post Open - National 86,207.00 0.00 2019-12-30 2020-08-20 2020-01-13 2020-02-03 2020-03-02 2020-03-09 2020-03-16 2020-03-28 2020-05-27 Access to Services and Inputs Selection Implementation contrôle des travaux de construction et d'équipement de la CAMVET BF-PADEL-B-161204-CS- CQS / Recrutement d'un Component 3: Crisis Consultant Consultant (Agence) pour la IDA / 61150 Management and Project Post Qualification Limited 20,690.00 18,078.45 Signed 2020-05-29 2020-06-08 2020-06-12 2020-07-09 2020-06-26 2020-08-04 2020-07-10 2020-11-09 2020-08-24 production d'un film Coordination Selection documentaire de 26 minutes BF-PADEL-B-161410-CS- CQS / Recrutement d'un Consultant Component 2: Livestock Under Cabinet chargé de l'évaluation IDA / 61150 Post Qualification Open - National 125,172.00 0.00 2020-05-29 2020-05-15 2020-06-12 2020-07-10 2020-07-24 2020-08-14 2020-10-13 Value Chain Development Implementation ex-post des micro-projets Selection financés BF-PADEL-B-93235-CS-FBS / Recrutement d'un consultant (bureau d'études/cabinet) Component 1: Improved Fixed Budget pour le suivi -contrôle des IDA / 61150 Post Open - National 74,000.00 0.00 Canceled 2019-09-06 2019-09-20 2019-10-18 2019-11-15 2019-11-22 2019-12-27 2020-01-17 2020-06-15 Access to Services and Inputs Selection travaux de construction de 10 postes vétérinaires, 50 parcs de vaccination et la CAMVET BF-PADEL-B-93231-CS-QBS / Recrutement d'un bureau d'étude pour la réalisation des d'études d'évaluation sociales Component 1: Improved Quality Based et de PAR pour les travaux de IDA / 61150 Post Open - National 51,000.00 0.00 Canceled 2019-09-06 2019-09-27 2019-10-18 2019-11-15 2019-11-22 2019-12-06 2019-12-27 2020-02-25 Access to Services and Inputs Selection constructions de postes vétérinaires, de parcs de vaccination pour petits ruminants, CAMVET Page 6 BF-PADEL-B-161414-CS- CQS / Recrutement de Consultant bureaux pour le renforcement Component 2: Livestock IDA / 61150 Post Qualification Limited 114,569.00 123,496.12 Signed 2020-05-20 2020-04-07 2020-06-03 2020-05-18 2020-07-03 2020-06-15 2020-07-17 2020-06-29 2020-08-01 des capacités techniques des Value Chain Development Selection promoteurs de micro-projets dans 4 zones BF-PADEL-B-161585-CS- CQS / Recrutement de bureaux pour le renforcement Consultant Component 2: Livestock de capacités en gestion IDA / 61150 Post Qualification Limited 114,569.00 123,496.12 Signed 2020-05-20 2020-04-07 2020-06-03 2020-05-18 2020-07-03 2020-06-12 2020-07-24 2020-06-29 2020-08-08 Value Chain Development financière et entreprenariat Selection des promoteurs de micro- projets financés dans 4 zones BF-PADEL-B-161823-CS- CQS / Recrutement de bureaux pour le suivi-contrôle Consultant et la coordination des travaux Component 1: Improved IDA / 61150 Post Qualification Limited 237,820.00 302,539.10 Signed 2020-03-30 2020-03-31 2020-04-13 2020-05-22 2020-05-13 2020-06-25 2020-06-17 2020-09-08 2020-12-14 de construction de quatorze Access to Services and Inputs Selection (14) postes vétérinaires et trente cinq (35) parcs de vaccination BF-PADEL-B-171037-CS- CQS / Recrutement d'un bureau pour le suivi-contrôle Consultant Component 1: Improved et coordination des travaux de IDA / 61150 Post Qualification Limited 7,759.00 22,752.15 Signed 2020-05-25 2020-05-14 2020-06-08 2020-06-10 2020-06-22 2020-06-25 2020-07-13 2020-07-10 2020-09-11 Access to Services and Inputs réalisation de 9 forages Selection positifs équipés de pompes à motricité humaine BF-PADEL-B-182227-CS- CQS / Recrutement d'un Consultant bureau pour la coordination et Component 1: Improved Under IDA / 61150 Post Qualification Limited 17,241.00 0.00 2020-07-22 2020-08-18 2020-08-05 2020-08-19 2020-09-02 2021-03-01 le suivi-contrôle des travaux Access to Services and Inputs Implementation Selection de construction du poste vétérinaire de Gorom-Gorom BF-PADEL-B-208178-CS- CQS / Suivi contrôle des Consultant Component 1: Improved Under travaux de construction des IDA / 61150 Post Qualification Limited 296,727.00 0.00 2021-05-31 2021-04-21 2021-06-14 2021-07-14 2021-08-18 2022-02-14 Access to Services and Inputs Implementation 53 parcs de vaccination et 19 Selection postes vétérinaires BF-PADEL-B-208181-CS- CQS / Recrutement d'un Component 3: Crisis Consultant Under consultant (Cabinet) chargé de IDA / 61150 Management and Project Post Qualification Limited 25,862.00 0.00 2021-03-31 2021-05-12 2021-04-14 2021-05-14 2021-06-18 2021-07-18 Implementation la formation et de l'archivage Coordination Selection des documents du PADEL-B BF-PADEL-B-217136-CS- CQS / Recrutement d'un Consultant Cabinet pour le renforcement Component 2: Livestock IDA / 61150 Post Qualification Limited 40,417.00 0.00 Under Review 2021-06-17 2021-03-30 2021-07-01 2021-07-31 2021-09-04 2021-09-19 des capacités des promoteurs Value Chain Development Selection des MP en gestion simplifiée/suivi financier BF-PADEL-B-217139-CS- Consultant CQS / Recrutement d'une Component 2: Livestock Pending IDA / 61150 Post Qualification Limited 6,897.00 0.00 2021-03-26 2021-04-09 2021-05-09 2021-06-13 2021-07-13 Agence pour produire et Value Chain Development Implementation Selection diffuser des Capsules Télé BF-PADEL-B-217130-CS- CQS / Recrutement d'un Consultant Bureau pour l'actualisation du Component 1: Improved Pending IDA / 61150 Post Qualification Limited 19,448.00 0.00 2021-04-20 2021-05-04 2021-06-03 2021-07-08 2021-11-05 DAO et le suivi-contrôle des Access to Services and Inputs Implementation Selection travaux de réhabilitation du marché à bétail INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Crisis Individual BF-PADEL-B-43505-CS-INDV IDA / 61150 Management and Project Post Consultant Limited 18,966.00 15,828.36 Completed 2018-09-27 2019-01-08 2018-10-02 2019-02-01 2018-10-09 2019-03-20 2018-10-30 2019-04-24 2018-11-03 2019-11-14 / Plan de contingence Coordination Selection BF-PADEL-B-43501-CS-INDV Component 3: Crisis Individual / Cartographie des risques en IDA / 61150 Management and Project Post Consultant Limited 18,966.00 11,019.35 Completed 2018-09-20 2018-04-27 2018-09-25 2018-05-07 2018-10-09 2018-07-02 2018-10-30 2018-07-23 2018-12-14 2018-11-16 élevage Coordination Selection Component 3: Crisis Individual BF-PADEL-B-43468-CS-CDS IDA / 61150 Management and Project Post Consultant Limited 6,897.00 6,711.33 Completed 2018-01-22 2018-01-23 2018-02-05 2018-02-01 2018-02-12 2018-02-19 2018-02-26 2018-02-19 2018-03-08 2018-02-28 / Formation CAM MRAH Coordination Selection Component 3: Crisis Individual BF-PADEL-B-43514-CS-INDV IDA / 61150 Management and Project Post Consultant Open 25,862.00 8,555.18 Completed 2018-02-26 2018-05-14 2018-04-16 2018-07-10 2018-05-07 2018-07-30 2018-06-11 2018-07-31 2018-07-11 2018-11-22 / Manuel SE Coordination Selection BF-PADEL-B-59194-CS-INDV / Consultant international Component 3: Crisis Individual Under pour l'élaboration du manuel IDA / 61150 Management and Project Post Consultant Open 18,966.00 0.00 2018-05-10 2018-06-28 2018-07-10 2018-07-19 2018-07-25 2018-08-23 2018-09-22 Implementation spécifique des alliances Coordination Selection productives BF-PADEL-B-59202-CS-INDV Component 3: Crisis Individual / Assistance technique pour IDA / 61150 Management and Project Post Consultant Direct 2,155.00 1,105.72 Completed 2018-03-26 2018-04-01 2018-03-08 2018-04-02 2018-03-08 2018-04-05 2018-03-09 2018-04-10 2018-03-11 partage d'expérience sur la Coordination Selection veille citoyenne BF-PADEL-B-59204-CS-INDV Component 3: Crisis Individual / Assistance technique pour la IDA / 61150 Management and Project Post Consultant Direct 1,724.00 1,785.48 Completed 2018-03-26 2018-03-23 2018-04-01 2018-04-05 2018-04-04 2018-03-23 2018-04-08 2018-04-05 2018-04-10 2018-05-03 mise en œuvre de la C2 Coordination Selection Page 7 BF-PADEL-B-60910-CS-INDV Component 3: Crisis Individual / Elaboration du manuel de IDA / 61150 Management and Project Post Consultant Open 16,380.00 18,674.73 Completed 2018-05-20 2018-05-11 2018-07-01 2018-07-10 2018-07-22 2018-07-25 2018-08-12 2018-07-31 2018-09-11 2018-11-22 procédures des alliances Coordination Selection productives BF-PADEL-B-60915-CS-INDV Component 3: Crisis Individual / Elaboration du manuel des IDA / 61150 Management and Project Post Consultant Direct 4,310.00 6,777.00 Completed 2018-05-30 2018-05-09 2018-06-09 2018-05-11 2018-06-11 2018-05-21 2018-06-25 2018-06-27 2018-07-25 2018-07-11 micros projets Coordination Selection BF-PADEL-B-93145-CS-CDS Component 3: Crisis / Auditeur externe pour IDA / 61150 Management and Project Post Direct Selection Direct 25,900.00 16,037.69 Completed 2018-12-31 2018-12-31 2019-01-10 2019-02-05 2019-01-27 2019-01-18 2019-03-13 2019-07-05 l'audit des comptes de Coordination l'exercice 2018 du PADEL-B BF-PADEL-B-93213-CS-INDV / Recrutement d'un consultant Individual individuel pour la réalisation Component 1: Improved IDA / 61150 Post Consultant Open 17,000.00 9,079.27 Completed 2018-12-31 2018-07-12 2019-01-26 2019-02-21 2019-02-02 2019-03-20 2019-02-23 2019-04-04 2019-04-24 2019-10-24 de l'étude de réévaluation du Access to Services and Inputs Selection coût réel de la vaccination (PPCB) BF-PADEL-B-93216-CS-INDV / Recrutement d'un Individual consultant individuel pour Component 1: Improved IDA / 61150 Post Consultant Open 25,000.00 0.00 Canceled 2019-02-08 2019-03-13 2019-03-18 2019-04-01 2019-05-01 l'élaboration des tables Access to Services and Inputs Selection alimentaires de différentes espèces BF-PADEL-B-93218-CS-INDV / Recrutement d'un consultant Individual Component 1: Improved individuel international pour IDA / 61150 Post Consultant Open 28,000.00 9,213.84 Signed 2019-04-18 2019-08-15 2019-05-21 2020-03-06 2019-05-26 2020-03-11 2019-06-09 2020-04-09 2019-07-09 Access to Services and Inputs former les agents sur la Selection sélection massale BF-PADEL-B-93223-CS-INDV / Recrutement d'un consultant individuel pour la réalisation Individual Component 1: Improved d'une étude sur le cadre IDA / 61150 Post Consultant Open 25,000.00 13,692.49 Completed 2019-04-11 2019-05-10 2019-05-05 2019-11-14 2019-05-12 2019-11-14 2019-05-26 2019-11-28 2019-06-25 2020-04-24 Access to Services and Inputs règlementaire et institutionnel Selection sur la gestion des ressources génétiques animales BF-PADEL-B-93226-CS-INDV / Recrutement d'un consultant Individual Component 1: Improved individuel pour l'élaboration IDA / 61150 Post Consultant Open 25,000.00 16,760.60 Completed 2019-05-13 2019-03-14 2019-06-15 2019-07-18 2019-06-22 2019-07-31 2019-07-06 2019-09-27 2019-08-05 2020-04-15 Access to Services and Inputs d'un plan de formation du Selection MRAH BF-PADEL-B-93227-CS-INDV / Recrutement d'un consultant Individual individuel pour l'élaboration Component 1: Improved IDA / 61150 Post Consultant Open 25,000.00 0.00 Canceled 2019-05-13 2019-06-15 2019-06-22 2019-07-06 2019-08-05 d'un référentiel technico Access to Services and Inputs Selection économique des productions de porcs BF-PADEL-B-93228-CS-INDV / Recrutement d'un consultant Individual individuel pour l'élaboration Component 1: Improved IDA / 61150 Post Consultant Open 25,000.00 0.00 Canceled 2019-05-13 2019-06-15 2019-06-20 2019-07-04 2019-08-03 d'un référentiel technico Access to Services and Inputs Selection économique des productions du miel BF-PADEL-B-93230-CS-INDV / Recrutement d'un consultant Individual individuel pour l'élaboration Component 1: Improved IDA / 61150 Post Consultant Open 25,000.00 0.00 Canceled 2019-05-13 2019-06-15 2019-06-22 2019-07-06 2019-08-05 d'un référentiel technico Access to Services and Inputs Selection économique des productions de la pintade BF-PADEL-B-93241-CS-INDV / Consultant individuel pour Individual Component 1: Improved l'élaboration de la stratégie IDA / 61150 Post Consultant Open 14,000.00 0.00 Canceled 2019-05-11 2019-06-06 2019-06-13 2019-06-27 2019-07-27 Access to Services and Inputs nationale de développement Selection durable de l'apiculture BF-PADEL-B-93243-CS-INDV Component 3: Crisis Individual / Recrutement d'un consultant IDA / 61150 Management and Project Post Consultant Open 24,830.00 23,509.52 Signed 2019-05-11 2019-01-15 2019-06-06 2019-10-28 2019-06-20 2019-10-28 2019-07-04 2019-11-22 2019-12-31 individuel à temps partiel en Coordination Selection appui à la DGESS du MRAH Component 3: Crisis Individual BF-PADEL-B-43522-CS-INDV IDA / 61150 Management and Project Post Consultant Limited 25,862.00 0.00 Canceled 2018-02-19 2018-03-05 2018-03-12 2018-04-02 2018-05-17 / Manuel fonds d'urgence Coordination Selection BF-PADEL-B-43502-CS-INDV Individual / Politique publique de Component 1: Improved IDA / 61150 Post Consultant Limited 25,862.00 0.00 Canceled 2018-09-27 2018-10-02 2018-10-16 2018-10-30 2018-12-14 promotion des produits Access to Services and Inputs Selection d'élevage BF-PADEL-B-93234-CS-FBS / Recrutement d'un consultant individuel pour les études architecturales, le suivi - contrôle des travaux de Individual Component 1: Improved Under construction du local du IDA / 61150 Post Consultant Limited 34,310.00 0.00 2019-04-10 2019-02-06 2019-04-15 2019-05-06 2019-06-10 2019-12-07 Access to Services and Inputs Implementation générateur, d'aménagement Selection de la taurellerie du CMAP ainsi que l'évaluation des infrastructures inachevées du PAFASP BF-PADEL-B-95689-CS-INDV / Recrutement d'un Component 3: Crisis Individual Consultant individuel chargé IDA / 61150 Management and Project Post Consultant Open 7,586.00 7,402.34 Completed 2019-02-21 2019-02-06 2019-03-19 2019-05-21 2019-04-02 2019-06-07 2019-04-16 2019-06-19 2019-05-16 2019-10-15 de la conception du site Web Coordination Selection du PADEL-B Page 8 BF-PADEL-B-94970-CS-CDS / Recrutement d'un consultant Individual pour l'établissement de l'état Component 2: Livestock IDA / 61150 Post Consultant Open 20,147.00 20,396.29 Completed 2019-01-31 2019-01-29 2019-02-26 2019-03-01 2019-03-12 2019-03-18 2019-03-26 2019-04-10 2019-05-10 2019-07-30 des lieux des pré-alliances Value Chain Development Selection potentielles des principales filières ciblées du PADEL-B BF-PADEL-B-108640-CS- CDS / Recrutement d'un Consultant individuel international pour la révision Component 2: Livestock du manuel spécifique IDA / 61150 Post Direct Selection Direct 6,551.00 6,020.18 Completed 2019-04-23 2019-05-08 2019-05-03 2019-05-13 2019-05-20 2019-05-23 2019-06-19 2019-09-05 Value Chain Development d'exécution des alliances productives prenant en compte les nouvelles dispositions BF-PADEL-B-109036-CS- INDV / Recrutement d'un Consultant individuel en vue Individual Component 1: Improved de l'élaboration d'un cadre IDA / 61150 Post Consultant Open 9,551.00 8,084.99 Completed 2019-04-30 2019-03-13 2019-05-26 2019-07-18 2019-06-02 2019-07-31 2019-06-14 2019-08-06 2019-07-29 2019-12-18 Access to Services and Inputs règlementaire en matière de Selection qualité d'aliments pour animaux BF-PADEL-B-118161-CS- INDV / Recrutement d'un Component 3: Crisis Individual consultant individuel pour IDA / 61150 Management and Project Post Consultant Open 5,517.00 7,612.02 Completed 2019-06-19 2020-01-27 2019-07-15 2019-10-28 2019-07-29 2019-12-02 2019-08-19 2019-12-05 2019-09-18 2020-04-21 l'élaboration d'un mécanisme Coordination Selection de gestion des plaintes du PADEL-B BF-PADEL-B-119443-CS- INDV / Recrutement d'un assistant n°1 en Individual développement d'entreprise et Component 2: Livestock IDA / 61150 Post Consultant Limited 26,362.00 28,037.41 Signed 2019-06-28 2019-07-08 2019-07-03 2019-08-02 2019-07-10 2019-09-13 2019-07-24 2019-09-16 2021-05-14 organisation de type Value Chain Development Selection coopératif pour la mise en œuvre de la composante 2 du PADEL-B BF-PADEL-B-119572-CS- INDV / Recrutement d'un assistant n°2 en Individual développement d'entreprises Component 2: Livestock IDA / 61150 Post Consultant Limited 26,362.00 28,061.60 Signed 2019-06-28 2019-07-08 2019-07-03 2019-08-02 2019-07-24 2019-09-13 2019-08-28 2019-09-16 2021-06-18 et organisation de type Value Chain Development Selection coopératif pour la mise en œuvre de la composante 2 du PADEL-B BF-PADEL-B-119575-CS- INDV / Recrutement d'un Individual Consultant chargé des Component 2: Livestock IDA / 61150 Post Consultant Limited 26,362.00 28,037.41 Signed 2019-06-28 2019-07-08 2019-07-03 2019-08-02 2019-07-24 2019-09-13 2019-08-28 2019-09-16 2021-06-18 questions sociales pour la Value Chain Development Selection mise en œuvre de la composante 2 du PADEL-B BF-PADEL-B-119576-CS- INDV / Recrutement d'un Individual assistant comptable pour la Component 2: Livestock IDA / 61150 Post Consultant Limited 16,690.00 17,750.30 Signed 2019-06-28 2019-07-08 2019-07-03 2019-08-02 2019-07-24 2019-09-13 2019-08-28 2019-09-16 2021-06-18 mise en œuvre de la Value Chain Development Selection composante 2 dans le cadre des micro-projets du PADEL-B BF-PADEL-B-119582-CS- INDV / Recrutement d'un assistant comptable pour la Individual Component 2: Livestock mise en œuvre de la IDA / 61150 Post Consultant Limited 16,690.00 17,765.62 Signed 2019-06-28 2019-07-08 2019-07-03 2019-08-02 2019-07-24 2019-09-13 2019-08-28 2019-09-16 2021-06-18 Value Chain Development composante 2 dans le cadre Selection des alliances productives du PADEL-B BF-PADEL-B-119583-CS- INDV / Recrutement d'un consultant chargé des Individual Component 2: Livestock questions en sauvegarde IDA / 61150 Post Consultant Limited 26,362.00 28,061.60 Signed 2019-06-28 2019-07-08 2019-07-03 2019-08-02 2019-07-24 2019-09-13 2019-08-28 2019-09-16 2021-06-18 Value Chain Development environnementale et sociale Selection pour la mise en œuvre de la composante 2 du PADEL-B BF-PADEL-B-119588-CS- INDV / Recrutement d'un assistant en passation des Individual Component 2: Livestock marchés pour la mise en IDA / 61150 Post Consultant Limited 26,362.00 28,061.60 Signed 2019-06-28 2019-07-08 2019-07-03 2019-08-02 2019-07-24 2019-09-13 2019-08-28 2019-09-16 2021-06-18 Value Chain Development œuvre de la composante 2 Selection dans le cadre des alliances productives du PADEL-B BF-PADEL-B-119590-CS- INDV / Recrutement d'un assistant en passation des Individual Component 2: Livestock marchés pour la mise en IDA / 61150 Post Consultant Limited 26,362.00 28,061.60 Signed 2019-06-28 2019-07-08 2019-07-03 2019-08-02 2019-07-24 2019-09-13 2019-08-28 2019-09-16 2021-06-18 Value Chain Development œuvre de la composante 2 Selection dans le cadre des micro- projets du PADEL-B BF-PADEL-B-119591-CS- INDV / Recrutement d'un Individual assistant suivi-évaluation n°1 Component 2: Livestock IDA / 61150 Post Consultant Limited 26,362.00 27,466.62 Signed 2019-06-28 2019-07-09 2019-07-03 2019-09-11 2019-07-24 2019-09-16 2019-08-28 2019-09-16 2021-06-18 dans le cadre de la mise en Value Chain Development Selection œuvre de la composante 2 du PADEL-B BF-PADEL-B-119592-CS- INDV / Recrutement d'un Individual assistant suivi-évaluation n°2 Component 2: Livestock IDA / 61150 Post Consultant Limited 26,362.00 28,061.60 Signed 2019-06-28 2019-07-09 2019-07-03 2019-08-02 2019-07-24 2019-09-13 2019-08-28 2019-09-16 2021-06-18 dans le cadre de la mise en Value Chain Development Selection œuvre de la composante 2 du PADEL-B BF-PADEL-B-123452-CS- INDV / Consultant chargé de l'audit/diagnostic des pré- Individual Component 2: Livestock alliances productives et IDA / 61150 Post Consultant Open 6,145.00 14,798.29 Signed 2019-09-02 2019-04-02 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development l'appui à la maturation dans la Selection Région de la Boucle du Mouhoun Page 9 BF-PADEL-B-123454-CS- INDV / Consultant chargé de l'audit/diagnostic des pré- Individual Component 2: Livestock alliances productives et IDA / 61150 Post Consultant Open 6,145.00 14,798.29 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-01 2020-03-15 Value Chain Development l'appui à la maturation dans Selection les Régions de l'Est et du Plateau Central n°2 BF-PADEL-B-123455-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 11,822.90 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Centre-Est BF-PADEL-B-123456-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 14,778.14 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Centre n°1 BF-PADEL-B-123458-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 11,822.90 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région des Hauts-Bassin n°1 BF-PADEL-B-123459-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 14,778.14 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-26 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Centre n°2 BF-PADEL-B-123460-CS- INDV / Consultant chargé de l'audit/diagnostic des pré- Individual Component 2: Livestock alliances productives et IDA / 61150 Post Consultant Open 6,145.00 14,778.14 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development l'appui à la maturation dans Selection les Régions des Cascades et Sud-Ouest BF-PADEL-B-123461-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 11,839.02 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Centre-Sud BF-PADEL-B-123462-CS- INDV / Consultant chargé de l'audit/diagnostic des pré- Individual Component 2: Livestock alliances productives et IDA / 61150 Post Consultant Open 6,145.00 14,778.14 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development l'appui à la maturation dans Selection les Régions du Centre-Nord et du Sahel BF-PADEL-B-123463-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 11,947.37 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région des Hauts-Bassins n°2 BF-PADEL-B-123466-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 14,798.29 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Nord BF-PADEL-B-123467-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 14,798.29 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Centre-Ouest BF-PADEL-B-123468-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 14,798.29 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Centre n°3 BF-PADEL-B-123471-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 11,839.02 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Plateau Central n°1 BF-PADEL-B-123472-CS- INDV / Consultant chargé de Individual l'audit/diagnostic des pré- Component 2: Livestock IDA / 61150 Post Consultant Open 6,145.00 14,798.29 Signed 2019-09-02 2019-04-08 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 alliances productives et Value Chain Development Selection l'appui à la maturation dans la Région du Centre n°4 BF-PADEL-B-123474-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual Component 2: Livestock productives et de l'appui à la IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development négociation avec les Selection Institutions financières partenaires/Région du Centre n°1 Page 10 BF-PADEL-B-123475-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual productives et de l'appui à la Component 2: Livestock IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 négociation avec les Value Chain Development Selection Institutions financières partenaires/Régions des Hauts-Bassins n°1 et Sud- Ouest BF-PADEL-B-123476-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual Component 2: Livestock productives et de l'appui à la IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-05 2020-03-15 Value Chain Development négociation avec les Selection Institutions financières partenaires/Région du Centre n°2 BF-PADEL-B-123477-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual Component 2: Livestock productives et de l'appui à la IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development négociation avec les Selection Institutions financières partenaires/Régions du Plateau Central n°1 et du Sahel BF-PADEL-B-123480-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual productives et de l'appui à la Component 2: Livestock IDA / 61150 Post Consultant Open 17,069.00 29,359.55 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-05 2020-03-15 négociation avec les Value Chain Development Selection Institutions financières partenaires/Régions de la Boucle du Mouhoun et des Hauts-Bassins n°2 BF-PADEL-B-123485-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual Component 2: Livestock productives et de l'appui à la IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development négociation avec les Selection Institutions financières partenaires/Régions du Centre-Sud et du Centre n°4 BF-PADEL-B-123487-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual Component 2: Livestock productives et de l'appui à la IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-23 2020-03-15 Value Chain Development négociation avec les Selection Institutions financières partenaires/Régions du Centre-Est et de l'Est BF-PADEL-B-123489-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual Component 2: Livestock productives et de l'appui à la IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development négociation avec les Selection Institutions financières partenaires/Régions du Centre-Ouest et des Cascades BF-PADEL-B-123490-CS- INDV / Consultant chargé de l'élaboration des plans Individual d'affaires des alliances Component 2: Livestock IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 productives et de l'appui à la Value Chain Development Selection négociation avec les Institutions financières partenaires/Régions du Nord BF-PADEL-B-123491-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual Component 2: Livestock productives et de l'appui à la IDA / 61150 Post Consultant Open 17,069.00 22,019.66 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development négociation avec les Selection Institutions financières partenaires/Région du Centre- Nord BF-PADEL-B-123492-CS- INDV / Consultant chargé de l'élaboration des plans d'affaires des alliances Individual Component 2: Livestock productives et de l'appui à la IDA / 61150 Post Consultant Open 17,069.00 29,359.55 Signed 2019-09-02 2019-03-11 2019-10-21 2019-07-10 2019-11-11 2019-07-17 2019-12-16 2019-08-02 2020-03-15 Value Chain Development négociation avec les Selection Institutions financières partenaires/Région du Plateau- Central n°2 BF-PADEL-B-43503-CS-INDV Component 3: Crisis Individual / Plan d'action opérationnel IDA / 61150 Management and Project Post Consultant Limited 18,966.00 0.00 Canceled 2018-09-27 2018-10-04 2018-10-18 2018-11-08 2018-12-23 de gestion des crises et Coordination Selection vulnérabilités en élevage BF-PADEL-B-43498-CS-INDV Individual Component 1: Improved / Gestion des ressources IDA / 61150 Post Consultant Open 25,862.00 0.00 Canceled 2018-06-25 2018-08-13 2018-09-03 2018-10-01 2018-11-15 Access to Services and Inputs génétiques Selection BF-PADEL-B-144676-CS- INDV / Recrutement d'un consultant individuel chargé Individual Component 1: Improved des investigations sur la IDA / 61150 Post Consultant Open 24,138.00 23,961.70 Signed 2019-12-14 2018-07-20 2020-02-01 2019-12-10 2020-02-22 2019-12-13 2020-03-28 2020-01-20 2020-09-24 Access to Services and Inputs mortalité des poissons des Selection barrages de Bagré et de Bazèga pour le compte du PADEL-B Page 11 BF-PADEL-B-149655-CS- INDV / Recrutement d’un consultant international pour Component 3: Crisis Individual la préparation et IDA / 61150 Management and Project Post Consultant Open 68,965.00 32,449.40 Signed 2019-12-20 2019-12-18 2020-01-22 2020-02-18 2020-02-05 2020-03-19 2020-02-26 2020-04-08 2020-04-11 l’accompagnement de Coordination Selection l’évaluation à mi-parcours du PADEL -B BF-PADEL-B-149656-CS- INDV / Recrutement d’un consultant national sénior Component 3: Crisis Individual pour la préparation et IDA / 61150 Management and Project Post Consultant Open 48,397.00 33,929.77 Signed 2019-12-20 2019-12-18 2020-01-15 2020-02-03 2020-01-22 2020-02-10 2020-02-05 2020-02-24 2020-03-21 l’accompagnement de Coordination Selection l’évaluation interne du PADEL- B dans le cadre de la Revue à mi-parcours BF-PADEL-B-156072-CS- INDV / Recrutement d'un Individual consultant pour la réalisation Component 1: Improved Under IDA / 61150 Post Consultant Limited 52,000.00 0.00 2020-04-17 2020-08-24 2020-05-01 2020-05-02 2020-05-16 2020-06-30 d'une étude épidémiologique Access to Services and Inputs Implementation Selection de la tuberculose et de la brucellose BF-PADEL-B-156077-CS- INDV / Recrutement d'un consultant individuel pour Component 3: Crisis Individual l'évaluation des capacités IDA / 61150 Management and Project Post Consultant Limited 17,000.00 18,110.72 Signed 2020-05-29 2020-07-17 2020-06-12 2020-12-02 2020-06-26 2020-12-22 2020-07-10 2020-12-24 2020-08-24 nationales de gestion de crise Coordination Selection alimentaire de bétail et des bonnes pratiques associées BF-PADEL-B-156091-CS- INDV / Recrutement d'un consultant individuel pour une Component 3: Crisis Individual enquête de satisfaction des IDA / 61150 Management and Project Post Consultant Limited 17,241.00 10,231.70 Signed 2020-05-18 2020-03-20 2020-06-01 2020-04-20 2020-06-08 2020-07-22 2020-06-22 2020-08-06 2020-07-22 besoins pratiques et intérêts Coordination Selection stratégiques et leur effet sur les rapports sociaux de genre BF-PADEL-B-156139-CS- CDS / Actualisation des Component 1: Improved Under études et suivi architecturale IDA / 61150 Post Direct Selection Direct 86,207.00 0.00 2020-04-08 2020-04-17 2020-04-18 2020-05-16 2020-11-12 Access to Services and Inputs Implementation des travaux de construction et d'équipement de la CAMVET BF-PADEL-B-161210-CS- INDV / Recrutement d'un Consultant individuel pour l'élaboration d'un guide de Individual Component 2: Livestock prise en compte des IDA / 61150 Post Consultant Limited 27,586.00 12,763.09 Signed 2020-08-31 2020-06-01 2020-09-14 2020-10-09 2020-10-05 2020-11-30 2020-11-02 2020-12-04 2020-12-17 Value Chain Development sauvegardes dans le Selection développement des AP, MP et infrastructures communautaires BF-PADEL-B-161213-CS- INDV / Recrutement d'un Individual consultant individuel pour Component 2: Livestock IDA / 61150 Post Consultant Limited 28,344.00 29,930.71 Signed 2020-06-29 2020-06-01 2020-07-13 2020-06-18 2020-08-03 2020-07-21 2020-08-24 2020-08-03 2020-10-08 l'élaboration du dispositif de Value Chain Development Selection suivi technico-économique des SP/PA BF-PADEL-B-161228-CS- INDV / Recrutement d'un Component 3: Crisis Individual consultant individuel pour la Pending IDA / 61150 Management and Project Post Consultant Limited 8,621.00 0.00 2020-08-31 2020-09-05 2020-09-19 2020-10-03 2020-11-02 sensibilisation et la formation Implementation Coordination Selection sur les codes de bonnes conduite BF-PADEL-B-161253-CS- INDV / Recrutement d'un consultant individuel pour Individual Component 1: Improved Under l'amélioration du cadre IDA / 61150 Post Consultant Limited 18,966.00 0.00 2020-07-16 2021-05-27 2020-07-21 2020-08-04 2020-08-25 2020-10-09 Access to Services and Inputs Implementation juridique et règlementaire de Selection la gestion des catastrophes naturelles sur le bétail BF-PADEL-B-161265-CS- INDV / Recrutement d'un Component 3: Crisis Individual consultant chargé de réaliser IDA / 61150 Management and Project Post Consultant Limited 17,241.00 9,607.13 Signed 2020-04-29 2020-04-25 2020-05-04 2020-06-12 2020-05-25 2020-08-11 2020-06-15 2020-08-14 2020-07-30 l'enquête de satisfaction Coordination Selection auprès des bénéficiaires des services du PADEL-B BF-PADEL-B-161275-CS- INDV / Recrutement d'un Component 3: Crisis Individual Consultant individuel chargé IDA / 61150 Management and Project Post Consultant Limited 22,414.00 3,780.63 Signed 2020-03-25 2020-04-30 2020-03-30 2020-05-29 2020-04-13 2020-06-05 2020-04-27 2020-06-12 2020-05-27 d'assurer la formation sur le Coordination Selection SIG BF-PADEL-B-161453-CS- INDV / Recrutement d'un consultant individuel en vue de la réalisation de Individual l'évaluation sociale/plan Component 1: Improved IDA / 61150 Post Consultant Limited 8,621.00 6,999.00 Signed 2020-04-24 2020-03-10 2020-04-29 2020-03-19 2020-05-13 2020-05-08 2020-05-27 2020-06-11 2020-06-26 d'actions de réinstallation de Access to Services and Inputs Selection 12 sites de parcs de vaccination dans le cadre de la mise en œuvre des activités du PADEL-B BF-PADEL-B-150371-CS- INDV / Recrutement d'un consultant junior n°1 chargé Individual Component 1: Improved des sauvegardes sociales et IDA / 61150 Post Consultant Limited 2,328.00 0.00 Canceled 2019-12-30 2020-01-04 2020-01-11 2020-01-25 2020-02-09 Access to Services and Inputs environnementales sur 5 sites Selection devant abriter les infrastructures BF-PADEL-B-150374-CS- INDV / Recrutement d'un consultant junior n°3 chargé Individual Component 1: Improved des sauvegardes sociales et IDA / 61150 Post Consultant Limited 1,862.00 0.00 Canceled 2019-12-30 2020-01-04 2020-01-11 2020-01-23 2020-02-07 Access to Services and Inputs environnementales sur 4 sites Selection devant abriter les infrastructures Page 12 BF-PADEL-B-150373-CS- INDV / Recrutement d'un consultant junior n°2 chargé Individual Component 1: Improved des sauvegardes sociales et IDA / 61150 Post Consultant Limited 2,328.00 0.00 Canceled 2019-12-30 2020-01-04 2020-01-11 2020-01-23 2020-02-07 Access to Services and Inputs environnementales sur 5 sites Selection devant abriter les infrastructures BF-PADEL-B-150375-CS- INDV / Recrutement d'un consultant junior n°4 chargé Individual Component 1: Improved des sauvegardes sociales et IDA / 61150 Post Consultant Limited 1,862.00 0.00 Canceled 2019-12-30 2020-01-04 2020-01-11 2020-01-23 2020-02-07 Access to Services and Inputs environnementales sur 4 sites Selection devant abriter les infrastructures BF-PADEL-B-161243-CS- INDV / Recrutement de consultants individuels en vue Individual de la réalisation de la notice Component 1: Improved IDA / 61150 Post Consultant Limited 26,621.00 28,821.52 Signed 2020-10-30 2020-05-15 2020-11-04 2020-10-10 2020-11-18 2020-11-20 2020-12-09 2020-11-23 2021-01-23 d'impact environnementale et Access to Services and Inputs Selection sociale des projets de réhabilitation/construction de diverses infrastructures BF-PADEL-B-161563-CS- CDS / Recrutement de consultants juniors pour l'identification consensuelle, Component 1: Improved IDA / 61150 Post Direct Selection Direct 31,138.00 59,229.98 Signed 2020-05-22 2020-05-27 2020-06-01 2020-06-22 2020-06-22 2020-09-10 2020-07-07 participative et la sélection Access to Services and Inputs sociale et environnementale des sites de construction de 70 parcs de vaccination BF-PADEL-B-161483-CS- CDS / Recrutement de Component 2: Livestock Pending consultants individuels IDA / 61150 Post Direct Selection Direct 155,172.00 0.00 2020-04-29 2020-05-09 2020-06-06 2020-09-04 Value Chain Development Implementation chargés de l'audit/diagnostic des plans d'affaires BF-PADEL-B-161493-CS- CDS / Recrutement de consultants individuels Component 2: Livestock Under IDA / 61150 Post Direct Selection Direct 349,138.00 0.00 2020-04-29 2020-10-26 2020-05-09 2020-05-30 2020-08-28 chargés de l'élaboration des Value Chain Development Implementation plans d'affaires des alliances productives BF-PADEL-B-208179-CS- Individual INDV / Suivi contrôle des Component 1: Improved Pending IDA / 61150 Post Consultant Limited 6,034.00 0.00 2021-05-28 2021-06-02 2021-06-23 2021-07-28 2022-01-24 travaux de construction de la Access to Services and Inputs Implementation Selection veratterie BF-PADEL-B-161226-CS- INDV / Recrutement d'un Component 3: Crisis Individual consultant individuel pour la IDA / 61150 Management and Project Post Consultant Limited 5,172.00 0.00 Canceled 2020-03-25 2021-01-15 2020-03-30 2020-04-13 2020-05-04 2020-06-18 revue à mi-parcours des Coordination Selection sauvegardes sociales BF-PADEL-B-161513-CS- INDV / Recrutement d'un Individual Component 1: Improved consultant individuel pour la IDA / 61150 Post Consultant Limited 25,862.00 0.00 Canceled 2020-04-17 2020-05-14 2020-04-22 2020-05-06 2020-05-20 2020-07-04 Access to Services and Inputs réalisation de l’étude sur les Selection maladies des abeilles BF-PADEL-B-161273-CS- INDV / Recrutement d'un Component 3: Crisis Individual consultant individuel chargé IDA / 61150 Management and Project Post Consultant Limited 5,172.00 0.00 Canceled 2020-03-30 2020-04-04 2020-04-18 2020-05-09 2020-06-23 du suivi-évaluation dans le Coordination Selection cadre de la revue à mi- parcours du PADEL-B BF-PADEL-B-161244-CS- INDV / Recrutement d'un consultant individuel en vue Individual de la réalisation de la notice Component 1: Improved IDA / 61150 Post Consultant Limited 6,655.00 0.00 Canceled 2020-09-24 2020-05-15 2020-09-29 2020-10-13 2020-10-27 2020-12-11 d'impact environnementale et Access to Services and Inputs Selection sociale du projet de réhabilitation du marché à bétail de Bobo-Dioulasso BF-PADEL-B-156140-CS- INDV / Etudes architecturales Individual Component 1: Improved et suivi contrôle des travaux IDA / 61150 Post Consultant Limited 27,586.00 0.00 Canceled 2020-05-20 2020-06-03 2020-06-17 2020-07-01 2020-12-28 Access to Services and Inputs de construction de sept (07) Selection logements pour bouviers BF-PADEL-B-161473-CS- CDS / Recrutement d'un Component 2: Livestock consultant individuel n°9 IDA / 61150 Post Direct Selection Direct 17,241.00 0.00 Canceled 2020-04-29 2020-06-01 2020-05-09 2020-06-06 2020-09-04 Value Chain Development chargé de l'audit/diagnostic des plans d'affaires BF-PADEL-B-182219-CS- INDV / Recrutement d'un Individual Component 1: Improved consultant individuel pour la IDA / 61150 Post Consultant Limited 12,931.00 0.00 Canceled 2020-09-18 2020-09-23 2020-10-07 2020-10-21 2020-11-20 Access to Services and Inputs formation sur le contrôle de Selection qualité BF-PADEL-B-156074-CS- INDV / Recrutement d'un consultant individuel pour Individual l'élaboration du dispositif de Component 2: Livestock IDA / 61150 Post Consultant Limited 16,000.00 0.00 Canceled 2020-04-30 2020-05-14 2020-05-28 2020-06-11 2020-07-26 suivi technico-économique Value Chain Development Selection des SP/PA et production de références techniques et économiques BF-PADEL-B-217119-CS- INDV / Recrutement d'un Individual Consultant pour l’élaboration Component 1: Improved Pending IDA / 61150 Post Consultant Limited 34,483.00 0.00 2021-05-20 2021-05-25 2021-06-15 2021-07-20 2021-09-03 et opérationnalisation du plan Access to Services and Inputs Implementation Selection d'autonomisation financière du CMAP Page 13 BF-PADEL-B-217122-CS- INDV / Recrutement d'un Consultant pour la réalisation Individual d’une étude sur l'adoption des Component 1: Improved Under IDA / 61150 Post Consultant Limited 51,724.00 0.00 2021-03-25 2021-02-26 2021-03-30 2021-04-20 2021-05-25 2021-07-09 technologies améliorées de Access to Services and Inputs Implementation Selection production animale, vulgarisées par le PADEL-B dans ses zones d’intervention BF-PADEL-B-217126-CS- Individual INDV / Recrutement d'un Component 1: Improved Pending IDA / 61150 Post Consultant Limited 9,724.00 0.00 2021-05-20 2021-05-25 2021-06-15 2021-07-20 2021-08-19 consultant pour a réalisation Access to Services and Inputs Implementation Selection de la NIES du marché à bétail BF-PADEL-B-217134-CS- INDV / Recrutement d'un Individual consultant pour l'élaboration Component 1: Improved Under IDA / 61150 Post Consultant Limited 34,483.00 0.00 2021-04-22 2021-04-26 2021-04-27 2021-05-18 2021-06-22 2021-08-21 de la strategie nationale de Access to Services and Inputs Implementation Selection développement de la filière avicole BF-PADEL-B-217137-CS- INDV / Recrutement d'un consultant pour les missions Individual terrain d'exploitation des Component 2: Livestock Pending IDA / 61150 Post Consultant Limited 17,241.00 0.00 2021-04-16 2021-04-21 2021-05-12 2021-06-16 2021-07-16 données techniques et Value Chain Development Implementation Selection financières au niveau des SP/PA, des Alliances Productives BF-PADEL-B-217148-CS- Component 3: Crisis Individual INDV / Recrutement de Pending IDA / 61150 Management and Project Post Consultant Limited 12,069.00 0.00 2021-04-21 2021-04-26 2021-05-17 2021-06-21 2021-07-21 consultant pour la réalisation Implementation Coordination Selection de NIES de la veraterie BF-PADEL-B-217149-CS- INDV / Recrutement d'un Individual Component 2: Livestock Under consultant pour l'animation de IDA / 61150 Post Consultant Limited 21,293.00 0.00 2021-04-12 2021-02-11 2021-04-17 2021-05-08 2021-06-12 2021-07-12 Value Chain Development Implementation la mise place de la plate Selection forme des filières animales BF-PADEL-B-217154-CS- INDV / Recrutement d'un Individual Component 2: Livestock Under consultant pour la mise en IDA / 61150 Post Consultant Limited 10,517.00 0.00 2021-04-15 2021-02-11 2021-04-20 2021-05-11 2021-06-15 2021-07-15 Value Chain Development Implementation place de la base de données Selection de la plate forme BF-PADEL-B-217155-CS- INDV / Recrutement d'un Component 3: Crisis Individual Pending consultant en vue IDA / 61150 Management and Project Post Consultant Limited 34,483.00 0.00 2021-05-20 2021-05-25 2021-06-15 2021-07-20 2021-07-23 Implementation d'implémenter l'outil IHEA Coordination Selection dans le secteur de l'élevage Page 14 Procurement Plan (For Contracts not yet initiated – to be entered in STEP) I. General 1. Project Information Country: Malawi Project Name: Southern Africa Tuberculosis & Health Systems Support Project Project ID: P155658 2. Project Implementation Agency: Ministry of Health – National TB Control Programme 3. Date of the Procurement Plan: June 2017 4. Period Covered by this procurement plan: 24 Months II. Thresholds for Prior Review, Procurement Approaches and Methods A. Goods, Works and Non-Consulting Services Procurement Approaches and Methods Prior Review (US$ millions) Category (US$ Open Open Request for millions) International National Quotation (RfQ) Works ≥5 ≥5 >0.1- <0.1 <5 Goods, IT, and > 0.1 - non-consulting ≥1 ≥1 <0.1 <5 services B. Consulting Services Category Prior Review Short List of National Consultants (US$ (US$ million) millions) Consulting Engineering and Services Construction Supervision Consultants ≥ 0.2 < 0.2 ≥ 0.3 (Firms) Individual ≥ 0.1 NA. NA. Consultants 1 [Overall Project Procurement Risk is SUBSTANTIAL] Notes: Terms of Reference: Terms of Reference for all contracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Consultancy Service for Contracts estimated to cost US$ 300,000 equivalent and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of wide circulation and/or Regional News Paper(s). 2 III. Packages for Goods, Works and Non-Consulting Services Component 1: Prevention Detection and Treatment of TB Goods Activity Contract Description Estimate Review Market Selection Evaluatio Procureme Prequ Domes Expect Expecte No d Cost by Approach Method n Options nt Process: alifica tic ed d date (US$) Bank (Open- (RFP, (BAFO, (Single/Mul tion Prefere date of of (Prior/P National/ RFB, Rated tiple (Yes/ nce bid/ Contract ost) Internation RFQ, DS Criteria Stages; No) (Yes/N propos Signatur al/ Limited etc.) etc.) One/Two o) al e etc.) Envelopes openin etc) g 1.2.1.1.5 Procure standard equipment 94,444 Post Limited RFQ Single No No 31st 30th for pre-in and post-service August Septem medical examinations for 2017 ber occupational health and safety. 2017 1.2.1.1.4 Procure Inspection Equipment 97,083 Post Limited RFQ Single No No 31st 30th for Ministry of Labour and August Septem Department of Mines 2017 ber 2017 1.1.1.4.4 Procure Motorcycles to support 63,300 Post Limited RFQ Single No No 31st 30th sputum sample collection August Septem points/supervision 2017 ber 2017 1.1.2.6.3 Personal protective materials 12,660 Post Limited RFQ Single No No 31st 30th for TB Laboratory Personnel August Septem (TB infection control) 2017 ber 2017 Stationery 19,305.4 Post Limited RFQ Single No No 31st 30th 9 August Septem 2017 ber 2017 Sub-Total 286,792 .49 3 Works Activity Contract Description Estimate Review Market Selection Evaluatio Procureme Prequ Domes Expect Expecte No d Cost by Approach Method n Options nt Process: alifica tic ed d date (US$) Bank (Open- (RFP, (BAFO, (Single/Mul tion Prefere date of of (Prior/P National/ RFB, Rated tiple (Yes/ nce bid/ Contract ost) Internation RFQ, DS Criteria Stages; No) (Yes/N propos Signatur al Limited etc.) etc.) One/Two o) al e etc.) Envelopes openin etc) g 1.1.3.3.1 Renovations (MDR TB Centres) 33,333 Post Limited RFQ Single No No 31st 30th August Septem 2017 ber 2017 1.1.2.6.2 Identify and Refurbishment of 41,667 Post Limited RFQ Single No No 31st 30th TB Isolation Rooms at selected August Septem facilities 2017 ber 2017 2.2.2.7.3 Renovations and Furnish Labs 108,333 Post Open- RFB Single No No 31st 30th National August Septem 2017 ber 2017 Sub-Total 183,333 4 Component 2: Regional Capacity for Disease Surveillance, Diagnostics Management of TB and Occupational Health Packages for Consulting Services Activity Contract Description Estimate Review Market Selectio Shortlis Expected date of bid/ Expected No d Cost by Approach n ting proposal opening date of (US$) Bank (Open- Method (Yes/ Contract (Prior/P National/ (QCBS, No) Signature ost) Internatio FBBS, nal LCBS, Limited QBS, etc.) CQS, DS etc.) 2.3.1.1.1 Consultant to draft/review the 18,950 Prior Open - CQS Yes 31st August 2017 30th Mines Safety Act/Public Health National September Act/Occupational Safety Health 2017 and Welfare Act and Regulations. Sub-Total 18,950 Goods 5 Activity Contract Description Estimated Review Market Selection Evaluati Procureme Prequ Domes Expect Expecte No Cost (US$) by Approach Method on nt Process: alifica tic ed d date Bank (Open- (RFP, RFB, Options (Single/Mul tion Prefere date of of (Prior/P National/ RFQ, DS (BAFO, tiple (Yes/ nce bid/ Contract ost) Internation etc.) Rated Stages; No) (Yes/N propos Signatur al Limited Criteria One/Two o) al e etc.) etc.) Envelopes openin etc) g 2.2.2.5.1 Procure Microscopes and Lab 53,932 Post Open- RFB Single No No 12 31 July Supplies National June 2017 2017 2.2.2.5.1 Procurement of Lab 20,000 Post Limited RFQ Single No No 31st 30th Information System, August Septem Computers and Printers 2017 ber 2017 2.2.2.6.1 Procure Xray Machines 888,889 Post Open- RFB Single No No 12 31 July National June 2017 2017 2.1.1.1.1 Procure Laptops for Regional 5352 Post Limited RFQ Single No No 31st 30th Field Epidemiology Training August Septem Program , 2017 ber 2017 2.2.2.4.1 Procure GeneXpert and 200,000 Post Limited RFB Single No No 31st 30th expand Xpert facilities August Septem 2017 ber 2017 Sub-Total 1,168,173 .00 Component 3: Learning, Knowledge and Innovation Packages for Consulting Services Activity Contract Description Estimate Review Market Selectio Shortlis Expected date of bid/ Expected No d Cost by Approach n ting proposal opening date of (US$) Bank (Open- Method (Yes/ Contract (Prior/P National/ (QCBS, No) Signature 6 ost) Internatio FBBS, nal LCBS, Limited QBS, etc.) CQS, DS etc.) 3.1.1.3.3 Consultant to conduct Baseline 108,410 Prior Open- DS Yes 28th February 2017 1st April Assessment for TB in Mines National 2017 3.1.1.4.3 Consultant to conduct E-Health 464409 Prior Open- DS Yes 8th March 2017 10th April for Community Intervention National 2017 3.1.31 IT Specialist - Consultant 36000 Post Open- DS Yes 11th May 2017 1st July National 2017 Sub-Total 608,819 7 Goods Activity Contract Description Estimate Review Market Selection Evaluatio Procureme Prequ Domes Expect Expecte No d Cost by Approach Method n Options nt Process: alifica tic ed d date (US$) Bank (Open- (RFP, (BAFO, (Single/Mul tion Prefere date of of (Prior/P National/ RFB, Rated tiple (Yes/ nce bid/ Contract ost) Internation RFQ, DS Criteria Stages; No) (Yes/N propos Signatur al Limited etc.) etc.) One/Two o) al e etc.) Envelopes openin etc) g 3.1.1.4.3 Procure E-Health for 125,000 Post Open- RFB Single No No 12 31 July Community Intervention National June 2017 Server, Computers, Networking 2017 and Tablets 3..3.43 Procure Geographical 4000 Post Limited RFQ Single No No Information System (GIS) Tool 3.4.1.1.1 Maintenance of Motor Vehicles 33,333 Post Limited RFQ Single No No 31st 30th 3 August Septem 2017 ber 2017 3.4.1.2.3 Purchase of Stationery 32,777 Post Limited RFQ Single No No 31st 30th August Septem 2017 ber 2017 3.4.1.2.1 Procurement of IT Equipment 105,000 Post Open- RFB Single No No 31st 30th (Video Conference National August Septem Facilities,Laptops and 2017 ber Communication 2017 Sub-Total 300,110 8 PROCUREMENT Eastern Africa : AFR RI-Southern Africa Tuberculosis and Health Systems Support Project PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-10-10 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155658 GPN Date: Project Name: AFR RI-Southern Africa Tuberculosis and Health Systems Support Project Loan / Credit No: IDA / 58220, IDA / 58230 Ministry of Health Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ZM-MOH-29874-CW-RFB / Regional Learning and Pending Request for Single Stage - One 2018-06- Purchase of 10x Air IDA / 58230 Innovation, and Project Post Open - National 12,500.00 0.00 Implementat 2017-10-25 2017-12-20 Quotations Envelope 18 Conditioner with Installation Management ion ZM-MOH-49382-CW-RFQ / Innovative Prevention, Upgrade laboratories (physical Request for Single Stage - One 2018-11- IDA / 58230 Detection and Treatment of Post Limited 137,000.00 0.00 Canceled 2018-04-07 2018-06-02 infrastructure) at Chest Quotations Envelope 29 TB Disease Laboratory ZM-MOH-49383-CW-RFB / Innovative Prevention, Pending Single Stage - One 2018-12- Renovate MDR-TB treatment IDA / 58230 Detection and Treatment of Post Request for Bids Open - International 500,000.00 0.00 Implementat 2018-03-02 2018-03-09 2018-04-20 2018-05-20 2018-06-24 Envelope 21 facility in Kitwe TB ion Regional Capacity for Disease ZM-MOH-52039-CW-RFQ / Pending Surveillance, and Diagnostics Request for Single Stage - One 2018-11- Pre-fabricated laboratory and IDA / 58230 Post Limited 105,000.00 0.00 Implementat 2018-03-27 2018-05-11 and Management of TB and Quotations Envelope 07 testing center ion Occupational Lung Diseases ZM-MOH-54875-CW-RFB / Regional Learning and Pending Rehabilitation of the Single Stage - One 2019-01- IDA / 58230 Innovation, and Project Post Request for Bids Open - National 448,928.73 0.00 Implementat 2018-03-20 2018-03-25 2018-05-06 2018-06-05 2018-07-10 Occupation and Health Envelope 06 Management ion Institute in Solwezi ZM-MOH-32274-CW-RFQ / Innovative Prevention, Pending Single Stage - One 2019-01- Rehabilitate of Occupation IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 922,607.11 0.00 Implementat 2018-04-08 2018-04-13 2018-05-25 2018-06-24 2018-07-29 Envelope 25 and Health Institute in Kitwe s TB ion ZM-MOH-29870-CW-RFB / Regional Learning and Under Renovation of MDR-TB Single Stage - One 2019-01- IDA / 58230 Innovation, and Project Post Request for Bids Open - National 500,000.00 0.00 Implementat 2018-04-09 2018-05-01 2018-04-14 2018-05-26 2018-06-25 2018-07-23 2018-07-30 treatment facility at Kitwe Envelope 26 Management ion Teaching Hospital ZM-MOH-57509-CW-RFQ / Innovative Prevention, Pending Request for Single Stage - One 2018-12- Civil works to renovate district IDA / 58230 Detection and Treatment of Post Limited 30,879.16 0.00 Implementat 2018-05-05 2018-06-30 Quotations Envelope 27 Laboratory in Sinda TB ion ZM-MOH-57510-CW-RFQ / Innovative Prevention, Pending Request for Single Stage - One 2018-12- Civil works to renovate district IDA / 58230 Detection and Treatment of Post Limited 15,789.47 0.00 Implementat 2018-04-23 2018-06-18 Quotations Envelope 15 Laboratory at Makululu TB ion ZM-MOH-57505-CW-RFQ / Innovative Prevention, Pending Civil works to renovate district Request for Single Stage - One 2018-12- IDA / 58230 Detection and Treatment of Post Limited 84,105.26 0.00 Implementat 2018-04-22 2018-06-17 Laboratory at George Clinic in Quotations Envelope 14 TB ion Lusaka ZM-MOH-57506-CW-RFQ / Innovative Prevention, Pending Civil works to renovate district Request for Single Stage - One 2018-12- IDA / 58230 Detection and Treatment of Post Limited 18,821.79 0.00 Implementat 2018-04-22 2018-06-17 Laboratory at Railways Quotations Envelope 14 TB ion Clinic ZM-MOH-57507-CW-RFQ / Innovative Prevention, Pending Civil works to renovate Request for Single Stage - One 2018-12- IDA / 58230 Detection and Treatment of Post Limited 9,545.68 0.00 Implementat 2018-04-23 2018-06-18 Laboratory facilities in Kapiri Quotations Envelope 15 TB ion Mposhi ZM-MOH-57508-CW-RFQ / Innovative Prevention, Pending Request for Single Stage - One 2018-12- Civil works to renovate district IDA / 58230 Detection and Treatment of Post Limited 1,052.63 0.00 Implementat 2018-04-23 2018-06-18 Quotations Envelope 15 Laboratory at LUC TB ion ZM-MOH-57511-CW-RFQ / Innovative Prevention, Pending Upgrade district laboratories Request for Single Stage - One 2018-12- IDA / 58220 Detection and Treatment of Post Limited 14,323.26 0.00 Implementat 2018-04-22 2018-06-17 (physical infrastructure) Quotations Envelope 14 TB ion in Solwezi ZM-MOH-57512-CW-RFQ / Innovative Prevention, Pending Upgrade district laboratories Request for Single Stage - One 2018-12- IDA / 58220 Detection and Treatment of Post Limited 14,428.53 0.00 Implementat 2018-04-22 2018-06-17 (physical infrastructure) at Quotations Envelope 14 TB ion Chaisa Clinic ZM-MOH-57513-CW-RFQ / Innovative Prevention, Pending Upgrade district laboratories Request for Single Stage - One 2018-12- IDA / 58220 Detection and Treatment of Post Limited 16,191.47 0.00 Implementat 2018-04-22 2018-06-17 (physical infrastructure) at Quotations Envelope 14 TB ion Lumwana Clinic in Solwezi ZM-MOH-57514-CW-RFQ / Innovative Prevention, Pending Upgrade district laboratories Request for Single Stage - One 2018-12- IDA / 58220 Detection and Treatment of Post Limited 32,174.42 0.00 Implementat 2018-04-22 2018-06-17 (physical infrastructure) Quotations Envelope 14 TB ion Mongu Urban ZM-MOH-57516-CW-RFQ / Innovative Prevention, Pending Upgrade district laboratories Request for Single Stage - One 2018-12- IDA / 58220 Detection and Treatment of Post Limited 97,473.68 0.00 Implementat 2018-04-22 2018-06-17 (physical infrastructure) Quotations Envelope 14 TB ion Kamuchanga in Mufulira ZM-MOH-57518-CW-RFQ / Innovative Prevention, Pending Request for Single Stage - One 2018-12- Upgrade district laboratories IDA / 58220 Detection and Treatment of Post Limited 25,263.16 0.00 Implementat 2018-04-22 2018-06-17 Quotations Envelope 14 (physical infrastructure) TB ion Isoka Page 1 ZM-MOH-57519-CW-RFQ / Innovative Prevention, Pending Civil works to renovate district Request for Single Stage - One 2018-12- IDA / 58220 Detection and Treatment of Post Limited 30,631.58 0.00 Implementat 2018-04-22 2018-06-17 Laboraroties Quotations Envelope 14 TB ion Maamba Hospital ZM-MOH-57520-CW-RFQ / Innovative Prevention, Pending Upgrade district laboratories Request for Single Stage - One 2018-12- IDA / 58230 Detection and Treatment of Post Limited 31,578.95 0.00 Implementat 2018-04-22 2018-06-17 (physical infrastructure) at Quotations Envelope 14 TB ion Kitwe Teaching Hospital ZM-MOH-59609-CW-RFQ / Innovative Prevention, Pending Request for Single Stage - One 2018-12- Civil works to renovate district IDA / 58230 Detection and Treatment of Post Limited 82,842.11 0.00 Implementat 2018-04-22 2018-06-17 Quotations Envelope 14 Laboratory at Nchanga North TB ion ZM-MOH-81747-CW-DIR / Innovative Prevention, Under 2019-05- Rehabilitation CDL Laboratory IDA / 58230 Detection and Treatment of Prior Direct Selection Direct 364,654.60 0.00 Implementat 2018-10-15 2018-10-20 2018-11-30 29 (Ventilation) TB ion ZM-MOH-166526-CW-RFQ / Partition of current Medical Innovative Prevention, Under Records section into new Request for Single Stage - One 2020-11- IDA / 58230 Detection and Treatment of Post Limited 266,666.67 0.00 Implementat 2020-06-05 2020-11-26 2020-07-31 Laboratory and Carry over Quotations Envelope 30 TB ion Renovations at OHSI Kitwe Office ZM-MOH-166527-CW-RFQ / Innovative Prevention, Under Request for Single Stage - One 2020-10- Install Local Area Network at IDA / 58230 Detection and Treatment of Post Limited 32,645.00 0.00 Implementat 2020-06-03 2020-09-22 2020-07-29 Quotations Envelope 30 Solwezi OHSI Branch TB ion ZM-MOH-166525-CW-RFB / Innovative Prevention, Single Stage - One 2020-11- Carry over Renovations IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 407,407.41 0.00 Canceled 2020-06-30 2020-07-05 2020-08-16 2020-09-15 2020-09-30 Envelope 30 Solwezi Office TB ZM-MOH-166528-CW-RFQ / Innovative Prevention, Implement of OHASIS Request for Single Stage - One 2020-08- IDA / 58230 Detection and Treatment of Post Limited 87,000.00 0.00 Canceled 2020-04-01 2020-05-27 Integrated Information System Quotations Envelope 31 TB to Link the CoE Institutions ZM-MOH-231538-CW-DIR / Innovative Prevention, Request for Pending Request for Single Stage - One 2021-12- Installation / Works at Kabwe IDA / 58230 Detection and Treatment of Post Limited Quotations (Non 35,090.00 0.00 Implementat 2021-06-05 2021-07-31 Quotations Envelope 31 General Hospital TB Bank-SPD) ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOH-29865-GO-RFB / Digital X-Ray Machines (Mobile) and 2xDigital Mobile Innovative Prevention, Pending Single Stage - One X-Ray Processor,Digital X-Ray IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 810,000.00 0.00 Implementati 2017-09-22 2017-09-27 2017-11-08 2017-12-08 2018-01-12 2018-07-11 Envelope Machines (stationed), Digital TB on Mobile X-Ray Processor(Stationed) ZM-MOH-29862-GO-RFB / X- ray Deffractory machines,Digital Mobile Audiometry machines,Detailed Innovative Prevention, Single Stage - One Lung Functioning IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 952,000.00 775,396.78 Completed 2017-09-29 2017-09-27 2017-10-04 2017-11-15 2017-11-03 2017-12-15 2018-01-19 2018-04-05 2018-07-18 2018-12-26 Envelope machines,Grametric dust TB Samplers,Digital Gass detectors and dust detectors,Sound level meter ZM-MOH-29544-GO-RFB / Biosafety cabinet,PCR clean air hoods,Twincubator with 2x Back up Power supply,Thermocycler,Freezer (- Innovative Prevention, Pending Single Stage - One 20◦C),Fridgerator (2◦C- IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 396,000.00 0.00 Implementati 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Envelope 8◦C),Automated Pipettes TB on (various sizes), Autoclave,microcentrifuge(wit h rotor),water bath,Vortex,Heating Block Innovative Prevention, Pending ZM-MOH-29561-GO-RFQ / Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Open - National 90,000.00 0.00 Implementati 2017-09-30 2017-11-25 2018-05-24 60 x Motor Cycles Quotations Envelope TB on ZM-MOH-29739-GO-RFQ / 60x cooler boxes,6000 specimen biohazard bags Regional Learning and Pending Request for Single Stage - One boxes (3 x5 inch),60 (1kg) IDA / 58230 Innovation, and Project Post Open - National 20,760.00 0.00 Implementati 2017-12-05 2018-01-30 2018-07-29 Quotations Envelope absorbent material,60 Management on biohazard signage for cooler boxes, ZM-MOH-29861-GO-RFB / Regional Learning and Pending Purchase of Motor Vehicles; Single Stage - One IDA / 58230 Innovation, and Project Post Request for Bids Open - National 446,001.00 0.00 Implementati 2017-08-08 2017-08-13 2017-09-24 2017-10-24 2017-11-28 2018-05-27 (4x4) Utility vehicles,30 seater Envelope Management on Mini Bus ZM-MOH-29733-GO-RFQ / Regional Learning and Pending Request for Single Stage - One Desk Top Computers, IDA / 58230 Innovation, and Project Post Open - National 106,242.00 0.00 Implementati 2017-08-30 2017-10-25 2018-04-23 Quotations Envelope Laptops, BGANS Management on ZM-MOH-29740-GO-RFQ / Regional Learning and Pending Request for Single Stage - One Printers,Photocopying IDA / 58230 Innovation, and Project Post Open - National 19,700.00 0.00 Implementati 2017-09-13 2017-11-08 2018-05-07 Quotations Envelope Machines,Shreddars,Scanners Management on ZM-MOH-29550-GO-RFQ / Regional Learning and Pending Office Tables,Office Request for Single Stage - One IDA / 58230 Innovation, and Project Post Open - National 51,000.00 0.00 Implementati 2017-08-30 2017-10-25 2018-04-23 Chairs,Workstation,Whiteboar Quotations Envelope Management on d, Page 2 ZM-MOH-29867-GO-RFQ / Xpert Cartridges, MTBDRplus Kit(96), MTBDRsl Kit (96), Mycobacterium AS Kit, Pipette Innovative Prevention, Pending Tips (box), Paper towels, Fine IDA / 58230 Detection and Treatment of Post Direct Selection Direct 19,585.97 0.00 Implementati 2017-11-30 2017-12-05 2018-01-09 2018-07-08 tip markers (box), Forceps, TB on Sputum containers, Lens cleansing tissue pkt of 100, Kim Wipes, EDTA Containers (pkt of 100) ZM-MOH-29918-GO-RFB / X- ray Deffractory machines,Digital Mobile Audiometry machines,Detailed Innovative Prevention, Single Stage - One Lung Functioning IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 952,000.00 0.00 Canceled 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Envelope machines,Grametric dust TB Samplers,Digital Gass detectors and dust detectors,Sound level meter ZM-MOH-47585-GO-RFQ / BE-Reading Equipment: i. 1x9 Imaging System - Regional Learning and Pending Colour IDA / 58230 Innovation, and Project Post Direct Selection Direct 264,739.20 0.00 Implementati 2018-02-05 2018-02-06 2018-02-12 2018-03-31 ii. 1x18 Imaging System - Management on Greyscale iii. 1x9 Computer for imaging ZM-MOH-49361-GO-DIR / 18x GeneXpert 4 Module With Desktop Innovative Prevention, 1x GeneXpert 2 Module With IDA / 58230 Detection and Treatment of Prior Direct Selection Direct 1,080,634.00 844,355.11 Signed 2018-02-26 2018-10-17 2018-03-01 2018-10-23 2018-06-04 2018-08-13 2018-12-01 Desktop TB 2x Gene Xpert 16 module with Desktop ZM-MOH-49364-GO-RFQ / Software programs (PACS) Servers Server Racks HP Blade system C700 enclosure Laptops Innovative Prevention, Pending Request for Single Stage - One IPADs IDA / 58230 Detection and Treatment of Post Open - National 159,654.00 0.00 Implementati 2018-03-06 2018-05-01 2018-10-28 Quotations Envelope 5x Desk top Purchase of TB on computers 5x Purchase of Laptops - OHSI 5x UPS, Laptop, XI. Printer, ZM-MOH-49365-GO-RFQ / Spot Dust Sampling Innovative Prevention, Pending Request for Single Stage - One equipment x 5 IDA / 58230 Detection and Treatment of Post Limited 75,000.00 0.00 Implementati 2018-03-17 2018-05-12 2018-11-08 Quotations Envelope 8 Hour' Dust Gravimetric Dust TB on Samplers x 5 ZM-MOH-49368-GO-RFQ / Innovative Prevention, Pending Request for Single Stage - One Class II Biological Safety IDA / 58230 Detection and Treatment of Post Limited 54,000.00 0.00 Implementati 2018-03-14 2018-04-02 2018-04-30 Quotations Envelope Cabinets TB on ZM-MOH-49371-GO-RFQ / Innovative Prevention, Pending Request for Single Stage - One 1x20 Office Chairs IDA / 58230 Detection and Treatment of Post Limited 13,000.00 0.00 Implementati 2018-03-13 2018-03-26 2018-03-31 Quotations Envelope 1x20 Office Tables TB on ZM-MOH-49376-GO-RFQ / Bill boards in provincial towns Innovative Prevention, Pending Branded Chitenge material Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 82,300.00 0.00 Implementati 2018-02-26 2018-03-13 2018-03-31 Re-print TB posters, Quotations Envelope TB on Branded raincoats Branded umbrellas ZM-MOH-49379-GO-RFQ / Innovative Prevention, Pending Request for Single Stage - One 1x3 Projectors (LCD) and IDA / 58230 Detection and Treatment of Post Limited 7,500.00 0.00 Implementati 2018-03-02 2018-03-13 2018-03-31 Quotations Envelope accessories TB on ZM-MOH-49380-GO-RFP / Assessment of ICT Infrastructure, requirement Regional Capacity for Disease analysis and business process Pending Surveillance, and Diagnostics Request for Single Stage - One analysis IDA / 58230 Post Open - National 86,802.60 0.00 Implementati 2018-04-02 2018-04-06 2018-04-09 2018-04-13 2018-04-30 2018-05-15 and Management of TB and Proposals Envelope Conduct Business Process on Occupational Lung Diseases Analysis Conduct Requirement Analysis Installation of software ZM-MOH-52036-GO-DIR / • Strengthening surveillance systems for epidemics including cholera countrywide and hotspot districts Innovative Prevention, Pending • Conducting water IDA / 58230 Detection and Treatment of Post Direct Selection Direct 633,177.63 0.00 Implementati 2018-03-05 2018-03-06 2018-03-23 2018-09-19 sampling to monitor TB on contamination • Strengthening laboratory capacity for cholera and other diarrhoeal diseases in identified hotsp ZM-MOH-49367-GO-RFP / Innovative Prevention, Pending Request for Single Stage - One ICT tools and equipment for IDA / 58230 Detection and Treatment of Post Limited 9,400.00 0.00 Implementati 2018-04-14 2018-06-09 2018-12-06 Quotations Envelope EBS TB on ZM-MOH-49374-GO-RFB / Innovative Prevention, Pending Single Stage - One Equipment Accessories for IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 450,000.00 0.00 Implementati 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2019-01-16 Envelope Kitwe Central Hospital TB on ZM-MOH-49363-GO-RFB / Equipment to diagnose silicosis and other Innovative Prevention, Pending occupational diseases Single Stage - One IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 549,521.89 0.00 Implementati 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2019-01-16 1 x Digital X-Ray machine Envelope TB on (Fixed) 1 x digital mobile X-Ray Macines, Page 3 ZM-MOH-54877-GO-RFQ / Innovative Prevention, Pending Equipment to diagnose Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 93,308.80 0.00 Implementati 2018-04-14 2018-06-09 2018-12-06 silicosis and other Quotations Envelope TB on occupational diseases ZM-MOH-58147-GO-RFQ / Procure laboratory Innovative Prevention, Pending Request for Single Stage - One consumables for IDA / 58230 Detection and Treatment of Post Limited 7,864.00 0.00 Implementati 2018-05-19 2018-07-14 2019-01-10 Quotations Envelope Occupational and Health TB on Institute (OHSI) ZM-MOH-29515-GO-RFB / Gene Xpert machines; 4 Innovative Prevention, UN Agencies Module, 16Module, 2 Module IDA / 58230 Detection and Treatment of Post Direct 899,403.97 0.00 Canceled 2017-09-29 2017-10-04 2017-11-08 2018-05-07 (Direct) with Desktop and Annual TB Calibration Kit ZM-MOH-58145-GO-RFQ / Innovative Prevention, Pending Procure laboratory Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 99,900.00 0.00 Implementati 2018-04-25 2018-06-20 2018-12-17 consumables for the National Quotations Envelope TB on TB reference laboratory ZM-MOH-59410-GO-DIR / Innovative Prevention, Under 27 GEN EXPERT MACHINES IDA / 58230 Detection and Treatment of Prior Direct Selection Direct 1,085,692.92 0.00 Implementati 2018-04-16 2018-04-21 2018-05-26 2018-11-22 FOR SATBHSS PROJECT TB on ZM-MOH-82064-GO-RFQ / Innovative Prevention, Under Request for Single Stage - One Diagnostic Audiometry IDA / 58230 Detection and Treatment of Post Limited 96,400.00 0.00 Implementati 2018-10-29 2018-11-12 2018-11-30 Quotations Envelope Machines TB on ZM-MOH-112406-GO-RFQ / Biosafety Cabinet Level 3 (x4) Innovative Prevention, Pending , Line probe Assay Machines x Single Stage - One IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 251,077.00 0.00 Implementati 2019-05-10 2019-05-15 2019-06-26 2019-07-26 2019-08-30 2020-02-26 3, BACTEC MGIT 960 (X1), Envelope TB on Centrifuges x 2, Deioniser x 1, Distiller x1, Refrigirator x 2 ZM-MOH-112407-GO-RFQ / Innovative Prevention, Pending Request for Single Stage - One Laboratory Consumables for IDA / 58230 Detection and Treatment of Post Limited 14,830.00 0.00 Implementati 2019-05-15 2019-07-10 2020-01-06 Quotations Envelope CDL TB on ZM-MOH-112412-GO-RFQ / Innovative Prevention, Pending Request for Single Stage - One Laboratory Consumables for IDA / 58230 Detection and Treatment of Post Limited 39,800.00 0.00 Implementati 2019-05-15 2019-07-10 2020-01-06 Quotations Envelope OHSI TB on Innovative Prevention, Pending ZM-MOH-112414-GO-RFQ / Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 45,000.00 0.00 Implementati 2019-05-15 2019-07-10 2020-01-06 Laptops x 20, Desktops x 2 Quotations Envelope TB on ZM-MOH-112415-GO-RFQ / Innovative Prevention, Pending Autoclave x2, Benchtop Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 99,000.00 0.00 Implementati 2019-05-22 2019-07-17 2020-01-13 Centrifuge x 2,Hematocrite Quotations Envelope TB on x2, Flourecent Microscopic x2 Innovative Prevention, Pending ZM-MOH-112416-GO-RFQ / Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 48,000.00 0.00 Implementati 2019-05-25 2019-07-20 2020-01-16 Tablet Computers Quotations Envelope TB on Innovative Prevention, Pending ZM-MOH-113099-GO-RFQ / Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 81,748.60 0.00 Implementati 2019-06-05 2019-07-31 2020-01-27 Generator Set Quotations Envelope TB on ZM-MOH-113104-GO-RFQ / Innovative Prevention, Pending X_Ray Digital Printer x 2, Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 42,000.00 0.00 Implementati 2019-06-04 2019-07-30 2020-01-26 X_Ray Lead Screens (Shield) x Quotations Envelope TB on 4 ZM-MOH-113109-GO-RFQ / Innovative Prevention, Pending Exammination Beds x 5, Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 65,141.83 0.00 Implementati 2019-06-05 2019-07-31 2020-01-27 Industrial weighing Sacales x Quotations Envelope TB on 4 ZM-MOH-113117-GO-RFQ / Weighung hygrometer x 2, Drager Pump x3, Whether Meter x1, Hannah Innovative Prevention, Pending Request for Single Stage - One Instruments x 1, Nanozen IDA / 58230 Detection and Treatment of Post Limited 61,725.00 0.00 Implementati 2019-06-05 2019-07-31 2020-01-27 Quotations Envelope (Digital Sampling Pump) x 5, TB on Noise Dosimeter x 5, Luxmeter x 5, and Analytical Balances x 2 ZM-MOH-113124-GO-RFQ / Innovative Prevention, Pending Request for Single Stage - One Land Cruser for Inspections of IDA / 58230 Detection and Treatment of Post Limited 142,000.00 0.00 Implementati 2019-06-12 2019-08-07 2020-02-03 Quotations Envelope Mines TB on ZM-MOH-78007-GO-RFB / 2 Innovative Prevention, Single Stage - One x Digital Mobile X-Ray IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 820,000.00 0.00 Canceled 2018-10-22 2018-10-26 2018-11-16 2018-12-28 2018-12-07 2019-01-04 2019-03-29 Envelope Machines with CAD and VAN TB ZM-MOH-113131-GO-RFB / Innovative Prevention, Pending Single Stage - One MDR TB: Ward Equipment- IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 450,000.00 0.00 Implementati 2019-06-10 2019-06-15 2019-07-27 2019-08-26 2019-09-30 2020-03-28 Envelope Kitwe Teaching Hospital TB on ZM-MOH-54879-GO-RFB / X- Innovative Prevention, Pending Request for Single Stage - One Ray Films and Accessories for IDA / 58230 Detection and Treatment of Post Limited 52,562.91 0.00 Implementati 2018-04-22 2018-06-17 2018-12-14 Quotations Envelope OHSI TB on ZM-MOH-117938-GO-RFQ / Procurement of ICT Innovative Prevention, Pending equipment for Development Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 78,620.00 0.00 Implementati 2019-07-05 2019-08-30 2020-02-26 of the IT systems for Quotations Envelope TB on compliance monitoring and mine health surveillance Innovative Prevention, Under ZM-MOH-112425-GO-RFQ / IDA / 58230 Detection and Treatment of Prior Direct Selection Direct 218,683.18 0.00 Implementati 2019-06-10 2019-06-15 2019-07-20 2020-01-16 Xpert Cartridges TB on Page 4 ZM-MOH-166488-GO-RFQ / Procurement of Hanah Innovative Prevention, Under Request for Single Stage - One Instruments, Noise Dosimeter IDA / 58230 Detection and Treatment of Post Limited 92,600.00 0.00 Implementati 2020-05-05 2020-09-18 2020-06-30 2020-09-30 Quotations Envelope and Nanozen real time dust TB on samplers ZM-MOH-166489-GO-RFQ / Innovative Prevention, Pending Procurement of Diagnostic Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 100.00 0.00 Implementati 2020-05-05 2020-06-30 2020-12-27 Audiometers and Mobile Quotations Envelope TB on Screening Audiometers ZM-MOH-166490-GO-RFQ / Procurement of Lead in Blood Analyser, AAS Atomic Adsorption Innovative Prevention, Under Request for Single Stage - One Spectrophotometer, Desiel IDA / 58230 Detection and Treatment of Post Limited 68,500.00 0.00 Implementati 2020-04-24 2021-03-01 2020-06-19 2020-09-30 Quotations Envelope Spectrophotometer, XRD TB on Chiller/humidifier, XRD Cooling System, XRD Gas Canisttors and Accessories ZM-MOH-166496-GO-RFQ / Innovative Prevention, Pending Request for Single Stage - One Procurement of Luxmeter and IDA / 58230 Detection and Treatment of Post Limited 29,200.00 0.00 Implementati 2020-05-05 2020-06-30 2020-09-30 Quotations Envelope Digital Vision Screener TB on ZM-MOH-166505-GO-RFQ / Procure Laboratory Innovative Prevention, Pending Request for Single Stage - One consumables to enable do IDA / 58230 Detection and Treatment of Post Limited 28,750.00 0.00 Implementati 2020-05-05 2020-06-30 2020-07-31 Quotations Envelope first and second line TB on phenotypic DST ZM-MOH-166507-GO-RFQ / Innovative Prevention, Pending Procure Laboratory Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 11,110.00 0.00 Implementati 2020-05-05 2020-06-30 2020-12-27 commodities to enable do Quotations Envelope TB on first and second line DST ZM-MOH-166523-GO-RFQ / Procurement of 3 laptops, 3 Innovative Prevention, Under desktop computers, scanner, Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 13,236.52 0.00 Implementati 2020-05-05 2020-10-20 2020-06-30 2020-07-31 printer and LCD projector for Quotations Envelope TB on MLSS staff supporting the project ZM-MOH-166477-GO-RFB / Procurement of 210 Laptops Innovative Prevention, Single Stage - One and Laptop Locks for all the IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 170,940.00 213,990.00 Signed 2020-04-07 2020-04-15 2020-04-12 2020-12-13 2020-05-24 2020-05-05 2020-06-23 2020-07-13 2020-07-28 2020-12-29 2020-08-31 Envelope 191 identified TB corners and TB District TB Coordinators ZM-MOH-113129-GO-RFB / Innovative Prevention, Single Stage - One 1X4 Digital Mobile X-ray IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 1,700,000.00 1,899,550.00 Completed 2019-05-10 2020-04-22 2019-05-15 2019-06-26 2019-08-09 2019-07-26 2019-08-30 2019-08-30 2020-04-16 2020-02-26 2021-06-10 Envelope Machines with CAD TB ZM-MOH-166480-GO-RFQ / Procurement of consumables for diagnosis and management of TB-HIV, Innovative Prevention, Diagnosis (Cartridges, Face IDA / 58230 Detection and Treatment of Prior Direct Selection Direct 2,450,000.00 2,372,000.00 Signed 2020-03-26 2020-06-15 2020-03-31 2020-06-16 2020-05-05 2020-08-07 2020-05-29 masks, TST and IGRA tests ), TB TB Screening management and support for EX-miners and other vulnerable populations ZM-MOH-166504-GO-RFQ / Innovative Prevention, Pending Procure reagents for Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 38,000.00 0.00 Implementati 2020-09-05 2020-10-31 2020-11-30 performing molecular second Quotations Envelope TB on line Susceptibility testing ZM-MOH-166487-GO-RFQ / Innovative Prevention, Request for Single Stage - One Procurement of Sound level IDA / 58230 Detection and Treatment of Post Limited 96,296.30 69,541.13 Signed 2020-09-05 2020-10-05 2020-10-31 2020-12-03 2020-12-18 Quotations Envelope meters and Spirometers TB Innovative Prevention, Pending ZM-MOH-113089-GO-RFQ / Request for IDA / 58230 Detection and Treatment of Post 3,500.00 0.00 Implementati 2021-01-08 2021-03-05 2021-05-28 LAM strips Quotations TB on ZM-MOH-166521-GO-RFQ / Procure 1 heavy duty and diesel powered electric power Innovative Prevention, Pending Request for Single Stage - One generator to provide the IDA / 58230 Detection and Treatment of Post Limited 45,000.00 0.00 Implementati 2021-01-09 2021-03-06 2021-03-06 Quotations Envelope alterantive power to the TB on offices and laboratory buildings ZM-MOH-166515-GO-RFQ / Innovative Prevention, Pending Procure laboratory reagents Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 2,411.38 0.00 Implementati 2021-01-20 2021-03-17 2021-09-13 and supplies for the Chest Quotations Envelope TB on Diseases Laboratory ZM-MOH-166501-GO-RFQ / Procurement of of ICT and Software programs (PACS and Document Management Innovative Prevention, Request for Single Stage - One System) for use to provide IDA / 58230 Detection and Treatment of Post Limited 97,300.00 0.00 Canceled 2020-05-02 2020-06-27 2020-10-30 Quotations Envelope linkages bewteen OHSI sites TB and cross boarder disease surveillance and digitisation of medical records ZM-MOH-166520-GO-RFQ / Innovative Prevention, Pending Procurement of equiment to Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 80,000.00 0.00 Implementati 2021-01-20 2021-03-17 2021-07-17 operationalise the dust Quotations Envelope TB on analytical laboratory ZM-MOH-117939-GO-RFB / Procure laboratory Innovative Prevention, commodities for the National Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 14,830.00 0.00 Canceled 2019-07-05 2019-08-30 2020-02-26 TB Reference Laboratory Quotations Envelope TB (supplies for ZN staining and LPA ) Page 5 ZM-MOH-166524-GO-RFQ / Procurement of ECHO Tele- Innovative Prevention, conferencing Equipment and Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 41,026.00 0.00 Canceled 2020-05-05 2020-06-30 2020-09-30 Installation at 4 spoke sites Quotations Envelope TB (health facilities) and the hub (OHSI) ZM-MOH-113100-GO-RFQ / Innovative Prevention, Bicycle for intra-district Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 60,571.38 0.00 Canceled 2019-05-28 2019-07-23 2020-01-19 courier of sputum to Quotations Envelope TB diagnostic centres Innovative Prevention, Pending ZM-MOH-113127-GO-RFQ / Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Open - National 98,000.00 0.00 Implementati 2019-05-11 2019-07-06 2020-01-02 ECG Machines Quotations Envelope TB on ZM-MOH-166483-GO-RFQ / Innovative Prevention, Pending Procurement of equipment Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 94,806.12 0.00 Implementati 2021-01-04 2021-03-01 2021-04-18 for conducting industrial risk Quotations Envelope TB on assessment at OHSI ZM-MOH-166482-GO-RFQ / Innovative Prevention, Procurement of personal Request for IDA / 58230 Detection and Treatment of Post 12,711.11 0.00 Canceled 2020-04-17 2020-04-30 2020-04-30 protective equipment and Quotations TB work tools for MDR-TB Nurses Innovative Prevention, Under ZM-MOH-228456-GO-RFB / Single Stage - One IDA / 58230 Detection and Treatment of Post Request for Bids Open - International 276,810.00 0.00 Implementati 2021-04-30 2021-06-03 2021-05-05 2021-06-10 2021-06-16 2021-07-16 2021-08-20 2021-12-31 Fixed Digital X-Ray Machine Envelope TB on Innovative Prevention, Pending ZM-MOH-231533-GO-DIR / Single Stage - One IDA / 58230 Detection and Treatment of Post Request for Bids Open - International 184,008.00 0.00 Implementati 2021-05-31 2021-06-05 2021-07-17 2021-08-16 2021-09-20 2021-12-31 TB-LAMP EQUIPMENT Envelope TB on Innovative Prevention, Pending ZM-MOH-231536-GO-RFQ / Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 4,100.00 0.00 Implementati 2021-06-05 2021-07-31 2021-09-30 X-RAY FUME PROCESSOR Quotations Envelope TB on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOH-29724-NC-RFQ / Regional Learning and Pending Request for Single Stage - One Print 6000 copies of dispatch IDA / 58230 Innovation, and Project Post Open - National 1,200.00 0.00 Implementati 2018-02-04 2018-04-01 2018-09-28 Quotations Envelope and transportation forms Management on ZM-MOH-29560-NC-RFQ / Innovative Prevention, Pending Request for Single Stage - One iii. Printing of screening IDA / 58230 Detection and Treatment of Post Open - National 18,750.00 0.00 Implementati 2018-02-04 2018-04-01 2018-09-28 Quotations Envelope Protocol TB on Regional Learning and Pending ZM-MOH-29731-NC-RFQ / Request for Single Stage - One IDA / 58230 Innovation, and Project Post Open - National 7,000.00 0.00 Implementati 2017-11-11 2018-01-06 2018-07-05 Branding of motor Vehicles Quotations Envelope Management on Innovative Prevention, Pending ZM-MOH-113096-NC-RFQ / Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 5,107.00 0.00 Implementati 2019-05-29 2019-07-24 2020-01-20 Billboards in targeted districts Quotations Envelope TB on Innovative Prevention, ZM-MOH-113094-NC-RFQ / Request for Single Stage - One IDA / 58230 Detection and Treatment of Post Limited 50,000.00 0.00 Canceled 2020-09-05 2020-10-31 2020-11-30 Printing of SOPs, job aids Quotations Envelope TB ZM-MOH-117937-CS-CQS / Innovative Prevention, Pending Navision Installation User Single Stage - Two IDA / 58230 Detection and Treatment of Post Request for Bids Open - National 160,400.00 0.00 Implementati 2020-12-28 2021-01-02 2021-02-13 2021-04-28 2021-06-02 2021-11-29 Licences under MSD, Labour Envelope TB on and OHSI and Training ZM-MOH-166522-NC-RFQ / Innovative Prevention, Request for Single Stage - One Printing recording and IDA / 58230 Detection and Treatment of Post Limited 7,290.64 0.00 Canceled 2020-05-05 2020-06-30 2020-12-27 Quotations Envelope reporting tools for EBS TB CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOH-29872-CS-CQS / i. Consultant Services for Regional Learning and Consultant laboratory designs and bill of Pending IDA / 58220 Innovation, and Project Post Qualification Open - National 63,000.00 0.00 2017-09-25 2017-10-16 2017-11-29 2017-12-29 2018-02-02 2018-08-01 quantities (Upgrade Implementation Management Selection laboratories physical infrastructure ZM-MOH-29567-CS-CQS / i. Consultant Services for Innovative Prevention, Consultant Pending designs and bill of quantities IDA / 58230 Detection and Treatment of Post Qualification Open - National 63,000.00 0.00 2017-09-25 2017-10-16 2017-11-29 2017-12-29 2018-02-02 2018-08-01 Implementation (MDR-TB treatment facility in TB Selection Lusaka ZM-MOH-29721-CS-CQS / i. Consultant Services for Regional Learning and Consultant laboratory designs and bill of IDA / 58230 Innovation, and Project Post Qualification Open - National 63,000.00 0.00 Canceled 2017-10-25 2017-10-25 2017-10-25 2017-10-25 2017-10-25 2017-10-25 quantities (Upgrade Management Selection laboratories physical infrastructure ZM-MOH-29554-CS-CQS / i. Consultant to undertake a Innovative Prevention, Consultant Baseline Survey and IDA / 58230 Detection and Treatment of Post Qualification Open - National 50,000.00 0.00 Canceled 2017-09-25 2017-10-16 2017-11-29 2017-12-29 2018-02-02 2018-08-01 Environmental Assessment TB Selection (Upgrade laboratories physical infrastructure Page 6 ZM-MOH-29720-CS-CQS / i. Consultant to conduct Regional Learning and Consultant baseline/environmental IDA / 58230 Innovation, and Project Post Qualification Open - National 47,000.00 0.00 Canceled 2017-09-25 2017-09-25 2017-09-25 2017-09-25 2017-09-25 2017-09-25 assessment; (renovation of Management Selection the MDR-TB treatment facility in Lusaka ZM-MOH-77328-CS-CQS / Evaluation report for provision Innovative Prevention, Consultant of consultancy services to IDA / 58230 Detection and Treatment of Prior Qualification Open - National 100,000.00 0.00 Canceled 2018-09-10 2018-10-02 2018-09-17 2018-10-29 2018-11-05 2018-11-30 2019-02-28 conduct an out of Pocket TB Selection (OOP) Study" Reference No. MoH/C/008/2018 ZM-MOH-77977-CS-CQS / Innovative Prevention, Consultant Consultancy services to IDA / 58230 Detection and Treatment of Post Qualification Open - National 50,000.00 0.00 Canceled 2018-09-17 2018-09-24 2018-10-05 2018-10-19 2018-10-31 2019-02-22 conduct district TB TB Selection Intervention Mapping ZM-MOH-144420-CS-QBS / TERMS OF REFERENCE FOR THE CONSULTANT ON THE Innovative Prevention, Quality And Cost- Under DEVELOPMENT OF THE IDA / 58230 Detection and Treatment of Post Open - National 580,000.00 0.00 2020-01-11 2020-02-25 2020-02-01 2020-03-16 2020-04-13 2020-05-13 2020-06-17 2020-07-22 2021-07-22 Based Selection Implementation CENTRAL ELECTRONIC TB DATABASE SYSTEM ON MINERS AND EX-MINERS IN ZAMBIA ZM-MOH-166484-CS-QBS / Procurement of consultancy Innovative Prevention, Consultant services to conduct mapping Under IDA / 58230 Detection and Treatment of Post Qualification Open - National 200,000.00 0.00 2020-04-15 2020-09-21 2020-05-06 2020-06-19 2020-11-26 2020-07-19 2020-08-23 2020-09-30 exercise and establish Implementation TB Selection database of ex-mine workers in six target provinces ZM-MOH-166529-CS-QBS / Procurement of Consultancy Innovative Prevention, Consultant Pending Services to conduct a IDA / 58230 Detection and Treatment of Post Qualification Open - National 120,000.00 0.00 2020-09-21 2020-10-12 2020-11-25 2020-12-25 2021-01-29 2021-07-28 Implementation Retrospective and Prospective TB Selection Study of Silicosis ZM-MOH-77971-CS-CQS / Consultancy services to Innovative Prevention, Consultant conduct a study on types of IDA / 58230 Detection and Treatment of Post Qualification Open - National 50,000.00 0.00 Canceled 2018-09-14 2018-12-17 2018-09-17 2018-10-08 2018-10-15 2018-11-01 2019-02-28 adverse Drug reactions among TB Selection patients on second- LINE DRUGS ZM-MOH-77965-CS-CQS / Consultancy services to Innovative Prevention, Consultant conduct an assessment of IDA / 58230 Detection and Treatment of Post Qualification Open - National 50,000.00 0.00 Canceled 2018-09-21 2018-12-21 2018-09-28 2018-10-08 2018-10-15 2018-11-02 2019-02-28 Tuberculosis among TB Selection Healthcare workers in Zambia ZM-MOH-77953-CS-CQS / Consultancy to conduct Innovative Prevention, Consultant assessment of Under- IDA / 58230 Detection and Treatment of Post Qualification Open - National 100,000.00 0.00 Canceled 2018-09-21 2018-12-03 2018-09-28 2018-11-11 2018-12-11 2019-01-15 2019-07-14 reporting in Zambia (Inventory TB Selection Study) ZM-MOH-77957-CS-CQS / Innovative Prevention, Consultant Consultancy services to IDA / 58230 Detection and Treatment of Post Qualification Open - National 100,000.00 0.00 Canceled 2018-09-17 2018-12-17 2018-09-21 2018-10-19 2018-10-26 2018-11-26 2019-02-28 conduct a study on Mortality TB Selection Attributable to TB in Zambia ZM-MOH-83391-CS-QCBS / Innovative Prevention, Consultancy services to Quality And Cost- IDA / 58230 Detection and Treatment of Post Open - International 450,000.00 0.00 Canceled 2018-10-26 2018-11-01 2018-10-31 2018-11-21 2018-11-23 2018-11-26 2018-11-28 2018-12-03 2018-12-21 2019-12-21 conduct an out of Pocket Based Selection TB (OOP) Study INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZM-MOH-49387-CS-INDV / Procure 1 Local consultant for 45 days to conduct Mapping Innovative Prevention, Individual and baseline assessment of Pending IDA / 58230 Detection and Treatment of Post Consultant Limited 30,000.00 0.00 2018-04-30 2018-05-05 2018-05-26 2018-06-30 2018-12-27 the Private hospitals, clinics, Implementation TB Selection and to select facilities with capacity to be diagnostic and treatment centres ZM-MOH-49388-CS-CDS / Lung Health Consultants from Innovative Prevention, The Union to come and Pending IDA / 58230 Detection and Treatment of Post Direct Selection Direct 98,060.00 0.00 2018-04-02 2018-04-12 2018-06-16 2018-12-13 conduct a full training Implementation TB package on programmatic management of TB ZM-MOH-51792-CS-CDS / Provision of Consultancy Regional Learning and Pending Services to conduct a Baseline IDA / 58230 Innovation, and Project Post Direct Selection Direct 190,000.00 0.00 2018-03-01 2018-03-05 2018-04-02 2018-09-29 Implementation survey for SATBHSS covering Management six (6) Provinces. Regional Capacity for Disease ZM-MOH-52042-CS-INDV / Individual Surveillance, and Diagnostics Pending Recruitment of Centre of IDA / 58230 Post Consultant Limited 54,000.00 0.00 2018-03-02 2018-03-07 2018-03-28 2018-05-02 2018-10-29 and Management of TB and Implementation Excellence Program Manager Selection Occupational Lung Diseases ZM-MOH-57521-CS-INDV / Innovative Prevention, Individual Pending Consultancy services for IDA / 58230 Detection and Treatment of Post Consultant Open 63,000.00 0.00 2018-04-16 2018-06-04 2018-06-25 2018-07-30 2019-01-26 Implementation laboratory designs at CDL TB Selection ZM-MOH-57522-CS-INDV / Innovative Prevention, Individual Pending Baseline /Environmental IDA / 58230 Detection and Treatment of Post Consultant Open 50,000.00 0.00 2018-04-16 2018-06-04 2018-06-25 2018-07-30 2019-01-26 Implementation Assessment- CDL TB Selection Page 7 ZM-MOH-55159-CS-INDV / RECRUITMENT OF CHIBESA Innovative Prevention, Individual Pending NDAWA IDA / 58230 Detection and Treatment of Post Consultant Open 143,242.11 0.00 2018-04-17 2018-06-05 2018-06-26 2018-07-31 2019-01-27 Implementation DATA MANAGER UNDER TB Selection SATBHSS ZM-MOH-55162-CS-INDV / RECRUITMENT OF EVANS Innovative Prevention, Individual TULISHA FOR THE POSITION Pending IDA / 58230 Detection and Treatment of Post Consultant Open 143,242.11 0.00 2018-04-17 2018-06-05 2018-06-26 2018-07-31 2019-01-27 OF Implementation TB Selection OCCUPATION HEALTH AND SAFETY OFFICER ZM-MOH-65684-CS-INDV / Innovative Prevention, Individual Recruitment of Centre of IDA / 58230 Detection and Treatment of Prior Consultant Open 143,242.11 0.00 Canceled 2018-09-17 2019-02-08 2018-11-05 2019-01-11 2018-11-26 2018-12-31 2019-06-29 Excellence Program Manager TB Selection UNDER SATBHSS PROJECT ZM-MOH-113149-CS-INDV / Innovative Prevention, Individual Pending RECRUIT OF CENTRE OF IDA / 58230 Detection and Treatment of Post Consultant Open 143,242.11 0.00 2019-05-05 2019-06-23 2019-07-14 2019-08-18 2020-02-14 Implementation EXCELLENCY MANAGAER TB Selection ZM-MOH-117940-CS-INDV / Consultancy Services to Innovative Prevention, Individual Pending Conduct A Baseline IDA / 58230 Detection and Treatment of Post Consultant Limited 32,500.00 0.00 2019-06-30 2019-07-05 2019-07-26 2019-08-30 2020-02-26 Implementation Retrospective Study Of TB Selection Silicosis In Zambia ZM-MOH-152651-CS-INDV / CONTRACT RENEWAL FOR GRANT MULENGA FOR THE Innovative Prevention, Individual POSITION OF IDA / 58230 Detection and Treatment of Prior Consultant Direct 143,242.11 64,302.43 Signed 2020-01-06 2020-03-24 2020-01-16 2020-03-25 2020-02-06 2020-04-27 2020-03-12 2021-02-01 2020-09-08 MONITORING AND TB Selection EVALUATION SPECIALIST UNDER SATBHSSP ZM-MOH-152652-CS-INDV / CONTRACT RENEWAL FOR MR. Innovative Prevention, Individual CONFUCIOUS MWEENE FOR IDA / 58230 Detection and Treatment of Prior Consultant Direct 143,242.11 64,302.43 Signed 2020-01-06 2020-03-24 2020-01-16 2020-03-25 2020-02-06 2020-05-03 2020-03-12 2021-02-01 2020-09-08 THE POSITION OF [PUBLIC TB Selection PRIVATE LIAISON OFFICER UNDER SATBHSSP ZM-MOH-152653-CS-INDV / CONTRACT RENEWAL FOR DR. SULANI NYIMBILI Innovative Prevention, Individual EPIDEMIOLOGIST FOR THE IDA / 58230 Detection and Treatment of Prior Consultant Direct 143,242.11 0.00 Canceled 2020-01-06 2020-01-16 2020-02-06 2020-03-12 2020-09-08 POSITION OF PUBLIC PRIVATE TB Selection LIAISON OFFICER UNDER SATBHSSP ZM-MOH-152654-CS-INDV / CONTRACT RENEWAL FOR MR. Innovative Prevention, Individual WILLIAM MWANZA IDA / 58230 Detection and Treatment of Prior Consultant Direct 682,190.52 0.00 Canceled 2020-01-06 2020-01-16 2020-02-06 2020-03-12 2020-09-08 FOR THE POSITION OF TB Selection ADMINISTRATIVE ASSISTANT UNDER SATBHSSP ZM-MOH-166102-CS-INDV / Innovative Prevention, Individual Procurement Plan for contract IDA / 58230 Detection and Treatment of Prior Consultant Direct 143,242.11 136,080.00 Signed 2020-03-24 2020-04-25 2020-04-03 2020-04-29 2020-04-24 2020-05-03 2020-05-29 2021-02-01 2021-05-28 renewal for Dr. Sulani Nyimbili TB Selection Epidemiologist ZM-MOH-166105-CS-INDV / Innovative Prevention, Individual Contract Renewal for Mr. IDA / 58230 Detection and Treatment of Prior Consultant Direct 68,210.50 64,800.00 Signed 2020-03-24 2020-04-15 2020-04-03 2020-05-04 2020-04-24 2020-05-04 2020-05-29 2021-02-01 2021-05-28 William Mwanza - TB Selection Administrator ZM-MOH-166112-CS-INDV / Contract Renewal for Mr. Innovative Prevention, Individual Chibesa Ndawa - Data IDA / 58230 Detection and Treatment of Prior Consultant Direct 143,242.11 1,360,800.00 Signed 2020-03-24 2020-04-16 2020-04-03 2020-04-01 2020-04-24 2020-05-03 2020-05-29 2021-02-01 2021-05-28 Manager at Occupational TB Selection Health and Safety Institute ZM-MOH-166116-CS-INDV / Innovative Prevention, Individual Contract renewal for Dr. Evans IDA / 58230 Detection and Treatment of Prior Consultant Direct 143,242.11 136,080.00 Signed 2020-03-24 2020-04-16 2020-04-03 2020-04-27 2020-04-24 2020-05-04 2020-05-29 2021-02-01 2021-05-28 Tulisha b- Occupational TB Selection Health and Safety Officer ZM-MOH-168792-CS-INDV / CONTRACT RENEWAL FOR MR. Innovative Prevention, Individual WILLIAM MWANZA FOR THE IDA / 58230 Detection and Treatment of Prior Consultant Direct 64,800.00 0.00 Canceled 2020-04-15 2020-04-25 2020-05-16 2020-06-20 2020-12-17 POSITION OF ADMINISTRATIVE TB Selection ASSISTANT UNDER SATBHSSP ZM-MOH-168795-CS-INDV / CONTRACT RENEWAL FOR DR. SULANI NYIMBILI Innovative Prevention, Individual EPIDEMIOLOGIST FOR THE IDA / 58230 Detection and Treatment of Prior Consultant Direct 143,242.10 0.00 Canceled 2020-04-15 2020-04-25 2020-05-16 2020-06-20 2020-12-17 POSITION OF PUBLIC PRIVATE TB Selection LIAISON OFFICER UNDER SATBHSSP ZM-MOH-166108-CS-INDV / Innovative Prevention, Individual Contract renewal for Mr. Lebai IDA / 58230 Detection and Treatment of Prior Consultant Direct 30,694.74 0.00 Canceled 2020-03-24 2020-04-03 2020-04-24 2020-05-29 2021-05-28 Enock Mudema - Project TB Selection Driver ZM-MOH-222179-CS-INDV / Regional Capacity for Disease Contract renewal for Dr. Individual Surveillance, and Diagnostics Under Fwasa Singogo - Project IDA / 58230 Prior Consultant Direct 110,803.11 0.00 2021-03-03 2021-03-06 2021-03-13 2021-03-22 2021-04-03 2021-05-08 2021-12-31 and Management of TB and Implementation Coordinator for period March Selection Occupational Lung Diseases 2021 to 31st December 2021 ZM-MOH-222172-CS-INDV / Contract Renewal for period Regional Capacity for Disease Individual 16th March 2021 to 31st Surveillance, and Diagnostics Under IDA / 58230 Prior Consultant Direct 62,458.19 0.00 2021-03-03 2021-03-06 2021-03-13 2021-03-05 2021-04-03 2021-03-10 2021-05-14 2022-01-06 December 2021 for the and Management of TB and Implementation Selection Position of Procurement Occupational Lung Diseases Specialist - Gift Sachihongo Page 8 PROCUREMENT PLAN (Textual Part) Emergency COVID-19 Project information: Serbia - Response Project (P173892) Project Implementation agency: Ministry of Health Project Coordination Unit (PCU) Date of the Procurement Plan: May 13, 2020 Period covered by this Procurement Plan: June 2020 – April 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: Not applicable. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable. Other Relevant Procurement Information. Procurement under the Project will be carried out in accordance with the World Bank Procurement Regulations for IPF borrowers (Borrowers Regulations), July 2016, revised November 2017 and August 2018. The project will be subject to the World Bank’s Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants, revised July 1, 2016; and the provisions stipulated in the Financing Agreement. The procurement and contract management processes will be tracked through the Systematic Tracking of Exchange in Procurement (STEP) system. The major planned procurement includes the following: (i) medical/laboratory equipment, (ii) PPE in facilities and triage; (iii) clinical management equipment; (iv) refurbishment and equipment of medical facilities; (v) capacity building and training (including for mass-media), development of communication strategies, community outreach and support to the project implementation and monitoring; and (vi) expertise for development and training of front-line responders. Given the emergency, all methods as specified under Procurement Regulations can be used, methods ensuring expedited delivery will be first considered. These include direct selection of firms as appropriate, Request for Quotations (RfQ) with no threshold limit for this method as appropriate, Request for Bid, both national and international, open. PROCUREMENT PLAN Method of Procurement Prior / Post Review Category Item Description Component 1: Emergency COVID-19 Response Subcomponent 1.1: Case Detection, Confirmation, Contact Tracing, Recording, Reporting Medical equipment (excluding medical and 1.1.1 sanitation supplies) for SARS-CoV2 labs in S&I RFB Post Kragujevac and Novi Sad Preparation of Detailed Design & Works 1.1.2 CS DS Post supervision 1.1.3 Protective equipment and tests for SARS-CoV2 G RFB Post Integration of all "SARS-CoV2 laboratories in the health information system in order to 1.1.4 G RFB Post create a comprehensive SARS-CoV2 electronic surveillance system 1.1.5 "Walk-in" testing point at the airport S&I RFB Post "Drive-through" testing point at the border 1.1.6 S&I RFB Post road crossing 1.1.7 SEP activities CS CQS Post Unallocated Sub-Component 1.1 total: Subcomponent 1.2: Social Distancing Measures and Communication Preparedness Physical distancing communication messages 1.2.1 CS CQS Post targeting vulnerable populations coordination of support activities for the 1.2.2 CS CQS Post population during social distancing measures Mass communication messages on 'Walk-in' 1.2.3 CS CQS Post and 'Drive-through' testing sites Trainings for PR representatives of healthcare 1.2.4 CS CQS Post facilities Unallocated Sub-Component 1.2 - Total: Subcomponent 1.3: Health System Strengthening Emergency medical vehicles equipped for 1.3.1 G RFB Post transportation of SARS-CoV2 patients 1.3.2 Intensive Care Unit (ICU) beds G RFB Post 1.3.3 Vital signs monitors G RFB Post 1.3.4 Mobile X-ray machines G RFB Post 1.3.5 CT devices S&I RFB Post X-ray devices for COVID clinics in community 1.3.7 G RFB Post healthcare centres Laptop computers for IPH epidemiological 1.3.8 G RFQ Post departments 1.3.9 Vehicles for IPH epidemiological departments G RFQ Post Unallocated Sub-Component 1.3 total: Component 1- Total: Component 2: Implementation Management and Monitoring and Evaluation PCU staff (including M&E specialist and ESIA 2.1 CS DS Post specialist) 2.2 Operating costs na na na 2.3 Financial software CS DS Post 2.4 Audit CS LCS Post Unallocated Component 2- Total: 100, TOTAL 000, 000 PROCUREMENT Serbia : Serbia Emergency COVID-19 Response Project PLAN General Information Country: Serbia Bank’s Approval Date of the Original Procurement Plan: 2020-12-11 2021-05-16 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173892 GPN Date: 2021-01-21 Project Name: Serbia Emergency COVID-19 Response Project Loan / Credit No: IBRD / 91200 P Executing Agency(ies): roject Coordination Unit (PCU) WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: RS-SECRP-9120YF-G-DS-21- Implementation Management 2.3 / Procurement of Financial IBRD / 91200 Post Direct Selection Direct 5,109.79 Signed 2021-02-17 2021-03-03 2021-02-22 2021-03-03 2021-03-29 2021-03-31 2022-05-31 and Monitoring and Software Evaluation RS-SECRP-9120YF-G-RFQ- Component 1: Emergency Request for Single Stage - One 21-1.3.1.2 / Vehicles for IPH IBRD / 91200 Post Open - International 359,783.97 Signed 2021-03-03 2021-03-22 2021-04-28 2021-05-11 2021-08-26 COVID-19 Response Quotations Envelope epidemiological departments RS-SECRP-9120YF-G-RFQ- Under 21-1.3.8 / Laptop computers Component 1: Emergency Request for Single Stage - One IBRD / 91200 Post Open - International 0.00 Implementati 2021-03-03 2021-03-22 2021-04-28 2021-08-26 for IPH epidemiological COVID-19 Response Quotations Envelope on departments & MOH RS-SECRP-9120YF-G-RFB-21- Under Component 1: Emergency Single Stage - One 1.3.1.1 / Ambulances and IBRD / 91200 Post Request for Bids Open - International 0.00 Implementati 2021-03-15 2021-04-16 2021-03-20 2021-04-22 2021-05-01 2021-05-31 2021-07-05 2022-01-01 COVID-19 Response Envelope other vehicles on RS-SECRP-9120YF-G-RFQ- Component 1: Emergency Request for Single Stage - One 21-1.3.1.3 / Vehicle with IBRD / 91200 Post Open - National 0.00 Canceled 2021-03-13 2021-07-16 2021-07-16 COVID-19 Response Quotations Envelope cooler unit RS-SECRP-9120YF-G-RFQ- Component 1: Emergency Request for Single Stage - One 21-1.3.1.4 / Vehicles with IBRD / 91200 Post Open - National 180,349.26 Signed 2021-03-13 2021-06-16 2021-05-11 2021-06-16 COVID-19 Response Quotations Envelope 4WD RS-SECRP-9120YF-G-RFB-21- Pending Component 1: Emergency Single Stage - One 1.3.12 / Procurement of IBRD / 91200 Post Request for Bids Open - International 0.00 Implementati 2021-03-15 2021-03-20 2021-05-01 2021-05-31 2021-07-05 2021-11-02 COVID-19 Response Envelope Ultrasounds on Under RS-SECRP-9120YF-G-RFB-21- Component 1: Emergency Single Stage - One IBRD / 91200 Post Request for Bids Open - International 0.00 Implementati 2021-04-16 2021-04-16 2021-04-21 2021-06-16 2021-06-02 2021-07-02 2021-08-06 2022-02-02 1.3.3 / Vital signs monitors COVID-19 Response Envelope on RS-SECRP-9120YF-G-RFB-21- Pending 1.3.4 / X-ray devices for Component 1: Emergency Single Stage - One IBRD / 91200 Post Request for Bids Open - International 0.00 Implementati 2021-05-20 2021-05-25 2021-07-06 2021-08-05 2021-09-09 2022-03-08 hospitals and primary health COVID-19 Response Envelope on care institutions Pending RS-SECRP-9120YF-G-RFB-21- Component 1: Emergency Single Stage - One IBRD / 91200 Post Request for Bids Open - International 0.00 Implementati 2021-05-20 2021-05-25 2021-07-06 2021-08-05 2021-09-09 2022-03-08 1.3.5 / CT devices COVID-19 Response Envelope on RS-SECRP-9120YF-G-RFQ- Component 1: Emergency Request for Single Stage - One 21-1.3.1.3.A / Vehicle with IBRD / 91200 Post Open - National 0.00 Canceled 2021-05-16 2021-10-18 2021-10-18 COVID-19 Response Quotations Envelope cooler unit RS-SECRP-9120YF-G-RFQ- 21-1.3.1.5 / Light Component 1: Emergency Request for Single Stage - One IBRD / 91200 Post Open - National 0.00 Canceled 2021-05-18 2021-07-13 2022-01-09 Commercial Vehicles with COVID-19 Response Quotations Envelope cooler unit RS-SECRP-9120YF-G-DS-21- 1.3.2 / Contract for the Pending Component 1: Emergency supply of Linet Goods and IBRD / 91200 Prior Direct Selection Direct 0.00 Implementati 2021-06-04 2021-06-09 2021-07-14 2021-10-12 COVID-19 Response Related Services: Hospital on beds “Eleganza 2” and “Eleganza 1” RS-SECRP-9120YF-G-DS-21- 1.3.2.1 / Contract for the Pending supply of Linet Goods and Component 1: Emergency IBRD / 91200 Post Direct Selection Direct 0.00 Implementati 2021-06-04 2021-06-09 2021-07-14 2021-10-12 Related Services: Children COVID-19 Response on Hospital Beds “TOM 2” and Hospital stretcher “Sprint 100” RS-SECRP-9120YF-G-RFQ- Pending Component 1: Emergency Request for Single Stage - One 21-1.1.1 / Hygiene packages IBRD / 91200 Post Open - National 0.00 Implementati 2021-06-22 2021-08-17 2021-10-16 COVID-19 Response Quotations Envelope for vulnerable population on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RS-SECRP-9120YF-TS-DS-21- Component 2: 2.26 / Agency for Implementation Management IBRD / 91200 Post Direct Selection Direct 4,257.28 Signed 2021-04-16 2021-04-14 2021-04-21 2021-04-14 2021-05-26 2021-04-28 2022-05-31 organization of trainings, and Monitoring and seminars and travel Evaluation Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RS-SECRP-9120YF-CS-CQS- Consultant 21-1.2.1 / Messages on Component 1: Emergency Under IBRD / 91200 Post Qualification Open - National 0.00 2021-02-26 2021-02-23 2021-03-19 2021-05-02 2021-06-01 2021-07-06 2022-05-31 physical distancing targeting COVID-19 Response Implementation Selection vulnerable populations RS-SECRP-9120YF-CS-CQS- 21-1.2.2 / Coordination of Consultant Component 1: Emergency Under population support activities IBRD / 91200 Post Qualification Open - National 0.00 2021-03-08 2021-03-02 2021-03-29 2021-05-12 2021-06-11 2021-07-16 2022-05-31 COVID-19 Response Implementation during physical distancing Selection measures INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management 2.16 / Environmental IBRD / 91200 Post Direct Selection Direct 22,091.40 Signed 2020-12-14 2020-12-11 2020-12-24 2020-12-17 2021-02-27 2020-12-31 2022-05-31 and Monitoring and Specialist Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management IBRD / 91200 Post Direct Selection Direct 21,950.10 Signed 2020-12-14 2020-12-11 2020-12-24 2020-12-15 2021-02-27 2020-12-25 2022-05-31 2.17 / Social Specialist and Monitoring and Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management IBRD / 91200 Post Direct Selection Direct 38,764.35 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-15 2022-05-31 2.1 / PCU Coordinator and Monitoring and Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management IBRD / 91200 Post Direct Selection Direct 29,407.43 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-15 2022-05-31 2.5 / Finance Specialist and Monitoring and Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management IBRD / 91200 Post Direct Selection Direct 24,129.00 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-13 2021-02-01 2021-01-15 2022-05-31 2.6 / Finance Officer and Monitoring and Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management IBRD / 91200 Post Direct Selection Direct 29,407.43 Signed 2020-12-28 2020-12-29 2021-01-07 2021-01-13 2021-02-01 2021-01-15 2022-05-31 2.7 / Procurement Specialist and Monitoring and Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management 2.8 / Monitoring and IBRD / 91200 Post Direct Selection Direct 25,518.99 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-15 2022-05-31 and Monitoring and Evaluation Specialist Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management IBRD / 91200 Post Direct Selection Direct 16,040.38 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-15 2022-05-31 2.9 / Administrative assistant and Monitoring and Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management 2.10 / Administrative IBRD / 91200 Post Direct Selection Direct 16,040.38 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-15 2022-05-31 and Monitoring and assistant Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management IBRD / 91200 Post Direct Selection Direct 29,164.33 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-15 2022-05-31 2.14 / Building expert and Monitoring and Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management 2.4 / Coordinator of the IBRD / 91200 Post Direct Selection Direct 34,754.23 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-13 2021-02-01 2021-01-15 2022-05-31 and Monitoring and Subcomponent 1.3 Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management 2.2 / Coordinator of the IBRD / 91200 Post Direct Selection Direct 30,032.95 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-15 2022-05-31 and Monitoring and Subcomponent 1.1 Evaluation Component 2: RS-SECRP-9120YF-CS-DS-20- Implementation Management 2.3 / Coordinator of the IBRD / 91200 Post Direct Selection Direct 29,164.46 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-15 2022-05-31 and Monitoring and Subcomponent 1.2 Evaluation Component 2: RS-SECRP-9120YF-CS-DS-21- Implementation Management 2.11 / Health Care IBRD / 91200 Post Direct Selection Direct 25,620.95 Signed 2021-02-17 2021-02-23 2021-02-27 2021-03-05 2021-05-03 2021-03-12 2022-05-31 and Monitoring and Strengthening Specialist Evaluation RS-SECRP-9120YF-CS-DS-21- Component 2: 2.12 / Health Care Implementation Management IBRD / 91200 Post Direct Selection Direct 23,141.37 Signed 2021-02-17 2021-02-23 2021-02-27 2021-03-03 2021-05-03 2021-03-12 2022-05-31 Organization and Financing and Monitoring and Specialist Evaluation RS-SECRP-9120YF-CS-DS-21- Component 2: 2.13 / Health Care Implementation Management IBRD / 91200 Post Direct Selection Direct 23,141.37 Signed 2021-02-17 2021-02-23 2021-02-27 2021-03-03 2021-05-03 2021-03-12 2022-05-31 Organization and Financing and Monitoring and Specialist Evaluation RS-SECRP-9120YF-CS-DS-21- 1.3.6 / Design, supervision, Component 1: Emergency IBRD / 91200 Post Direct Selection Direct 238,599.90 Signed 2021-02-17 2021-02-23 2021-02-27 2021-03-03 2021-05-03 2021-04-09 2022-05-31 project management and COVID-19 Response technical support services Page 2 Component 2: RS-SECRP-9120YF-CS-DS-21- Implementation Management IBRD / 91200 Post Direct Selection Direct 61,168.34 Signed 2021-03-08 2021-03-24 2021-03-18 2021-03-15 2021-04-12 2021-03-31 2022-05-31 2.15 / Procurement Specialist and Monitoring and Evaluation Component 2: RS-SECRP-9120YF-CS-DS-21- Implementation Management Under IBRD / 91200 Post Direct Selection Direct 0.00 2021-04-26 2021-06-04 2021-05-06 2021-07-10 2022-05-31 2.22 / Legal Consultant and Monitoring and Implementation Evaluation Component 2: RS-SECRP-9120YF-CS-DS-21- Implementation Management Under 2.23 / Administrative IBRD / 91200 Post Direct Selection Direct 0.00 2021-04-26 2021-06-04 2021-05-06 2021-07-10 2022-05-31 and Monitoring and Implementation Assistant Evaluation Component 2: RS-SECRP-9120YF-CS-DS-21- Implementation Management Under IBRD / 91200 Post Direct Selection Direct 0.00 2021-04-26 2021-06-04 2021-05-06 2021-07-10 2022-05-31 2.24 / IT Consultant and Monitoring and Implementation Evaluation RS-SECRP-9120YF-CS-DS-21- Component 2: 2.25 / Citizen Engagement Implementation Management Under IBRD / 91200 Post Direct Selection Direct 0.00 2021-04-26 2021-06-04 2021-05-06 2021-07-10 2022-05-31 and Roma mediation and Monitoring and Implementation consultant Evaluation Component 2: RS-SECRP-9120YF-CS-DS-21- Implementation Management Under IBRD / 91200 Post Direct Selection Direct 0.00 2021-04-26 2021-05-12 2021-05-06 2021-07-10 2022-05-31 2.21 / Audit and Monitoring and Implementation Evaluation Component 2: Individual RS-SECRP-9120YF-CS-IC-21- Implementation Management Under IBRD / 91200 Post Consultant Limited 0.00 2021-04-26 2021-06-04 2021-05-01 2021-05-22 2021-06-26 2022-05-31 2.18 / PR Specialist and Monitoring and Implementation Selection Evaluation Page 3 PROCUREMENT PLAN (Textual Part) Project information: Republic of Congo - Commercial Agriculture Project P-159979 Project Implementation agency: Ministry of Agriculture, Livestock and Fisheries Date of the Procurement Plan: October 5, 2017 Period covered by this Procurement Plan (PPA): October 5, 2017 - January 31, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not applicable Goods: Not applicable Works: Not applicable Other Relevant Procurement Information. Procurement in Situations of Urgent Need of Assistance or Capacity Constraints PROCUREMENT Congo, Republic of : Commercial Agriculture Project PLAN General Information Country: Congo, Republic of Bank’s Approval Date of the Original Procurement Plan: 2017-10- 05 2021-05- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159979 GPN Date: 29 Project Name: Commercial Agriculture Project Loan / Credit No: IDA / V0400, IDA / 61110 Commercial Agriculture Project Executing Agency(ies): WORKS Activity Reference No. Procurement Estimate Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificatio High SEA/SH Process Prequalification Bidding Documents Contract / Description Component Review Type Method Document d Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process n (Y/N) Risk Status Evaluation Report as Issued Completion Type Amount (US$) Documents Justification / Invitation Opening / Minutes Recommendation (US$) Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planne d Component 2: Improving CG-PDAC-0015-T-AON / public infrastructure and Single Stage - One 100,000.0 102,258.2 2017-11- 2018-06- 2017-12- 2018-10- 2018-01- 2018-11- 2018-01- 2018-12- 2018-02- 2019-01- 2018- Aménagement siège UNCP IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 0 0 28 29 03 23 02 23 07 06 02 09 06-02 et ADPS du PDAC commercial agriculture CG-PDAC-0073-T-AON- Component 2: Improving 18 / Entretien piste agricole Under public infrastructure and Single Stage - One 128,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- Les Saras-Aviation-Bondika IDA / 61110 Post Request for Bids Limited 0.00 Implemen the business climate for Envelope 0 28 18 03 20 14 23 13 28 18 04-16 (24 km) dans le tation commercial agriculture département du Kouilou CG-PDAC-0072-T-AON- Component 2: Improving Under 18 / Entretien piste public infrastructure and Single Stage - One 276,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- IDA / 61110 Post Request for Bids Limited 0.00 Implemen Pilikondi-Bilala (38 km), the business climate for Envelope 0 28 18 03 20 14 23 13 28 18 04-16 tation dans le Département du commercial agriculture Kouilou CG-PDAC-0071-T-AON- Component 2: Improving 18 / Entretien piste agricole Under public infrastructure and Single Stage - One 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- Mavitou-Lac Cayo (11 km), IDA / 61110 Post Request for Bids Limited 80,000.00 0.00 Implemen the business climate for Envelope 28 18 03 20 14 23 13 28 18 04-16 dans le Département du tation commercial agriculture Kouilou CG-PDAC-0070-T-AON- Component 2: Improving Under 18 / Entretien piste agricole public infrastructure and Single Stage - One 126,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- IDA / 61110 Post Request for Bids Limited 0.00 Implemen Malolo-Dihessé (27 km), the business climate for Envelope 0 28 18 03 20 14 23 13 28 18 04-16 tation dans le Département du commercial agriculture Niari CG-PDAC-0069-T-AON- Component 2: Improving 18 / Entretien Himo piste Under public infrastructure and Single Stage - One 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- agricole Ingah-Ingolo-Mah- IDA / 61110 Post Request for Bids Limited 48,000.00 0.00 Implemen the business climate for Envelope 28 18 03 20 14 23 13 28 18 04-16 Imvouba (35 km), dans le tation commercial agriculture Département du Pool CG-PDAC-0066-T-AON- Component 2: Improving Under 18 / Entretien piste agricole public infrastructure and Single Stage - One 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- IDA / 61110 Post Request for Bids Limited 90,000.00 0.00 Implemen Boko-Ngondzo (18 km), the business climate for Envelope 28 18 03 20 14 23 13 28 18 04-16 tation dans le Département du commercial agriculture Pool CG-PDAC-0062-T-AON- Component 2: Improving Under 18 / Entretien piste agricole public infrastructure and Single Stage - One 104,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- IDA / 61110 Post Request for Bids Limited 0.00 Implemen Yonon-Ossa-Kialé (18 km), the business climate for Envelope 0 28 18 03 20 14 23 13 28 18 04-16 tation dans le Département des commercial agriculture Plateaux CG-PDAC-0061-T-AON- Component 2: Improving 18 / Entretien piste agricole Under public infrastructure and Single Stage - One 100,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-06- 2018-10- 2019- Kibamba-Kidzoumba (28 IDA / 61110 Post Request for Bids Limited 0.00 Implemen the business climate for Envelope 0 28 18 03 20 14 23 13 28 18 04-16 km), dans le Département tation commercial agriculture de la Bouenza CG-PDAC-0065-T-AON- Component 2: Improving Under 18 / Entretien Himo piste public infrastructure and Single Stage - One 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- IDA / 61110 Post Request for Bids Limited 40,000.00 0.00 Implemen agricole Itomba-Eboyo 2 the business climate for Envelope 28 18 03 20 14 23 13 28 18 04-16 tation (28 km), dans le commercial agriculture Départeemnt des Plateaux CG-PDAC-0063-T-AON- Component 2: Improving 18 / Entretien Himo piste Under public infrastructure and Single Stage - One 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- agricole Djambala-Abala IDA / 61110 Post Request for Bids Limited 16,000.00 0.00 Implemen the business climate for Envelope 28 18 03 20 14 23 13 28 18 04-16 Ndolo (10 km), dans le tation commercial agriculture Département des Plateaux CG-PDAC-0060-T-AON- Component 2: Improving 18 / Entretien piste agricole Under public infrastructure and Single Stage - One 116,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- Bouansa-Ngouédi/Bretelles IDA / 61110 Post Request for Bids Limited 0.00 Implemen the business climate for Envelope 0 28 18 03 20 14 23 13 28 18 04-16 (30 km), dans le tation commercial agriculture Département de la Bouenza CG-PDAC-0059-T-AON- Component 2: Improving 18 / Entretien piste agricole Under public infrastructure and Single Stage - One 114,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- Dzouama-Doubandjo- IDA / 61110 Post Request for Bids Limited 0.00 Implemen the business climate for Envelope 0 29 18 04 20 15 23 14 28 19 04-17 Adingo (37 km) dans le tation commercial agriculture Département de la Cuvette- Ouest CG-PDAC-0068-T-AON- Component 2: Improving 18 / Entretien piste agricole Under public infrastructure and Single Stage - One 114,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- Odziba-DzionDzion- IDA / 61110 Post Request for Bids Limited 0.00 Implemen the business climate for Envelope 0 28 18 03 20 14 23 13 28 18 04-16 Makemba (39 km), dans le tation commercial agriculture Département du Pool CG-PDAC-0067-T-AON- Component 2: Improving 18 / Entretien piste agricole Under public infrastructure and Single Stage - One 260,000.0 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- Massa-Maty centre- IDA / 61110 Post Request for Bids Limited 0.00 Implemen the business climate for Envelope 0 28 18 03 20 14 23 13 28 18 04-16 Binokina (71 km), dans le tation commercial agriculture Département du Pool CG-PDAC-0085-T-AON- Component 2: Improving Under 18 / Entretien Himo piste public infrastructure and Single Stage - One 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019- IDA / 61110 Post Request for Bids Limited 20,000.00 0.00 Implemen agricole Makemba-Ingolo the business climate for Envelope 28 18 03 20 14 23 13 28 18 04-16 tation (13km) dans le commercial agriculture Département du Pool CG-PDAC-0357-T-ED-19 / Travaux-Réhabilitation de Component 3: la radio rurale d'enyelle Strengthening institutional 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019- dans le Departement de la IDA / 61110 capacity to support the Post Direct Selection Direct 40,000.00 34,054.00 Signed 21 24 26 30 31 10 11-27 Lokouala avec la Société development of commercial TECHNOLOGY AFRICA agriculture TELECOM & INGENEERING TAT CG-PDAC-0375-T-DCF-19 Component 2: Improving / HIMO-Travaux d'ntretien public infrastructure and Single Stage - One 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- de la piste Dzouama- IDA / 61110 Post Request for Bids Open - National 26,500.00 7,782.66 Signed the business climate for Envelope 24 27 29 16 10 26 09 31 13 19 03-11 doubandzo-Adingo dans le commercial agriculture Département de la Cuvette- Ouest CG-PDAC-0376-T-DCF-19 Component 2: Improving / HIMO-Entretien de la piste public infrastructure and Single Stage - One Complete 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- IDA / 61110 Post Request for Bids Open - National 8,000.00 7,783.50 Djambala-Abala-Ndolo the business climate for Envelope d 24 27 29 16 10 26 09 31 13 19 03-11 dans le Département des commercial agriculture Plateaux CG-PDAC-0377-T-DCF-19 Component 2: Improving / HIMO- Travaux d'entretien public infrastructure and Single Stage - One Complete 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- de la piste Yonon-Ossa- IDA / 61110 Post Request for Bids Open - National 14,000.00 13,832.11 the business climate for Envelope d 24 27 29 16 10 26 09 31 13 19 03-11 Kialé dans le Département commercial agriculture des Plateaux CG-PDAC-0378-T-DCF-19 Component 2: Improving / HIMO-Travaux d'entretien public infrastructure and Single Stage - One Complete 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- de la piste Odziba-dzion IDA / 61110 Post Request for Bids Open - National 29,100.00 6,570.72 the business climate for Envelope d 24 27 29 16 10 26 09 31 13 19 03-11 dzion Makemba -Ingolo commercial agriculture dans le Département du Pool CG-PDAC-0379-T-DCF-19 Component 2: Improving / HIMO-Travaux d'entretien public infrastructure and Single Stage - One 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- de la piste Massa-Maty IDA / 61110 Post Request for Bids Open - National 53,100.00 62,434.87 Signed the business climate for Envelope 24 27 29 16 10 26 09 31 13 19 03-11 Centre-Binokina dans le commercial agriculture Département du Pool CG-PDAC-0380-T-DCF-19 Component 2: Improving / HIMO-Travaux d'entretien public infrastructure and Single Stage - One Complete 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- IDA / 61110 Post Request for Bids Open - National 14,500.00 9,789.51 de la piste Boko6Ngondzo the business climate for Envelope d 24 27 29 16 10 26 09 31 13 19 03-11 dans le Département du commercial agriculture Pool CG-PDAC-0381-T-DCF-19 Component 2: Improving / HIMO-Travaux d'entretien public infrastructure and Single Stage - One 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-09- 2019-09- 2019-08- 2020- de la piste Kindzoumba- IDA / 61110 Post Request for Bids Open - National 21,500.00 10,523.73 Signed the business climate for Envelope 24 27 29 16 10 26 09 30 13 19 03-11 Kibamba dans le commercial agriculture Département de la Bouenza CG-PDAC-0382-T-DCF-19 Component 2: Improving / HIMO-Travaux d'entretien public infrastructure and Single Stage - One 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- de la piste Bouansa- IDA / 61110 Post Request for Bids Open - National 22,200.00 10,906.36 Signed the business climate for Envelope 24 27 29 16 10 26 09 31 13 19 03-11 Ngouédi-Kindzaba- commercial agriculture Bretelles dans le Département de la Bouenza CG-PDAC-0384-T-DCF-19 / HIMO-Travaux d'entretien Component 2: Improving de la piste Les Saras-Car public infrastructure and Single Stage - One 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-09- 2019-09- 2019-10- 2020- IDA / 61110 Post Request for Bids Open - National 26,500.00 3,908.06 Signed Mboma/Aviation-Bondika the business climate for Envelope 24 27 29 16 10 26 09 30 13 17 03-11 dans le Département du commercial agriculture Kouilou CG-PDAC-0385-T-DCF-19 Component 2: Improving / HIMO-Travaux d'entretien public infrastructure and Single Stage - One 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-09- 2019-09- 2019-10- 2020- de la piste Mavitou-Lac IDA / 61110 Post Request for Bids Open - National 10,300.00 5,729.23 Signed the business climate for Envelope 24 27 29 16 10 26 09 30 13 17 03-11 Cayo dand le Département commercial agriculture du Kuoilou CG-PDAC-0386-T-AON- Component 2: Improving 19 / HIEQ-Travaux public infrastructure and Single Stage - One 216,700.0 238,752.2 Complete 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- IDA / 61110 Post Request for Bids Open - National d'entretien de la piste the business climate for Envelope 0 1 d 24 27 29 16 10 26 09 30 13 19 03-11 Itomba-Eboyo2 dans le commercial agriculture Département des Plateaux CG-PDAC-0387-T-AON- Component 2: Improving 19 / HIEQ-Travaux public infrastructure and Single Stage - One 200,000.0 162,716.0 Complete 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- d'entretien de la piste IDA / 61110 Post Request for Bids Open - National the business climate for Envelope 0 6 d 24 27 29 16 10 26 09 30 13 20 03-11 Ngania-Ngouené-Okassa commercial agriculture dans le Département des Plateaux CG-PDAC-0388-T-AON- Component 2: Improving 19 / HIEQ-Travaux public infrastructure and Single Stage - One 145,850.0 115,776.5 Complete 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- d'entretien de la piste Ingah- IDA / 61110 Post Request for Bids Open - National the business climate for Envelope 0 2 d 24 27 29 16 10 26 09 30 13 19 03-11 Ingolo-Mah-Imvouba dans commercial agriculture le Département du Pool CG-PDAC-0389-T-AON- Component 2: Improving 19 / HIEQ-Travaux public infrastructure and Single Stage - One 417,000.0 864,762.6 Complete 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020- confortatifs de la piste IDA / 61110 Post Request for Bids Open - National the business climate for Envelope 0 5 d 24 27 29 16 10 26 09 30 13 19 03-11 Pilikondi-Bilala-Banga dans commercial agriculture le Département du Kouilou CG-PDAC-407-T-AO-19 / Component 2: Improving Réhabilitation-Travaux de public infrastructure and Single Stage - One 1,000,000. 778,553.4 Complete 2019-06- 2019-10- 2019-06- 2019-11- 2019-07- 2019-11- 2019-08- 2019-11- 2019-10- 2020-02- 2020- réhabilitation de la piste IDA / 61110 Post Request for Bids Open - National the business climate for Envelope 00 6 d 14 09 19 13 31 21 30 25 04 05 04-01 Mpassi-Mpassi - 6 commercial agriculture manguiers dans le Département du Niari CG-PDAC-406-T-AO-19 / Réhabilitation-Travaux de Component 2: Improving réhabilitation de la piste public infrastructure and Single Stage - One 500,000.0 521,392.6 Complete 2019-06- 2019-10- 2019-06- 2019-11- 2019-07- 2019-11- 2019-08- 2019-11- 2019-10- 2020-02- 2020- IDA / 61110 Post Request for Bids Open - National Dibeni-Mpassi-Mpassi- the business climate for Envelope 0 4 d 14 09 19 13 31 21 30 25 04 05 04-01 Maboko dans le commercial agriculture Départetement du Niari CG-PDAC-405-T-AO-19 / Component 2: Improving Réhabilitation-Travaux de public infrastructure and Single Stage - One 450,000.0 607,310.4 Complete 2019-06- 2019-10- 2019-06- 2019-07- 2019-10- 2019-08- 2019-10- 2019-10- 2019-10- 2020- réhabilitation de la piste IDA / 61110 Post Request for Bids Open - National the business climate for Envelope 0 2 d 14 04 19 31 16 30 17 04 24 04-01 Tsiaki- Mahouobo dans le commercial agriculture Département de la Bouenza CG-PDAC-404-T-AO-19 / Réhabilitation-Travaux de Component 2: Improving réhabilitation de la piste public infrastructure and Single Stage - One 500,000.0 583,100.7 Complete 2019-06- 2019-10- 2019-06- 2019-11- 2019-07- 2019-11- 2019-08- 2019-11- 2019-10- 2019-12- 2020- IDA / 61110 Post Request for Bids Open - National Kayes -Louamba et the business climate for Envelope 0 7 d 14 09 19 13 31 21 30 27 04 23 04-01 achevement du pont dans le commercial agriculture Département de la Bouenza CG-PDAC-402-T-AO-19 / Component 2: Improving Réhabilitation-Travaux de public infrastructure and Single Stage - One 300,000.0 258,319.4 Complete 2019-06- 2019-10- 2019-06- 2019-11- 2019-07- 2019-11- 2019-08- 2019-11- 2019-10- 2019-12- 2020- réhabilitation de la piste IDA / 61110 Post Request for Bids Open - National the business climate for Envelope 0 7 d 14 09 19 13 31 21 30 25 04 23 04-01 Boko-Mandombé/Bretelles commercial agriculture dans le Département du Pool CG-PDAC-400-T-AO-19 / Réhabilitation-Travaux de Component 2: Improving réhabilitation de la piste public infrastructure and Single Stage - One 500,000.0 1,447,739 2019-06- 2019-11- 2019-06- 2019-07- 2020-01- 2019-08- 2020-01- 2019-10- 2020-02- 2020- Pamba Odzaka- IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 0 .76 14 27 19 31 07 30 09 04 05 04-01 Odzema/Imania-Okombé- commercial agriculture Oko dans le Département de la Cuvette CG-PDAC-401-T-AO-19 / Component 2: Improving Réhabilitation-Travaux de public infrastructure and Single Stage - One 470,000.0 350,225.7 Complete 2019-06- 2019-10- 2019-06- 2019-11- 2019-07- 2019-11- 2019-08- 2019-11- 2019-10- 2019-12- 2020- réhabilitation de la piste IDA / 61110 Post Request for Bids Open - National the business climate for Envelope 0 0 d 14 11 19 14 31 21 30 25 04 23 04-01 Ngo 2 - Adzi-Impé dans le commercial agriculture Département des Plateaux CG-PDAC-415-T-AO-19 / Réhabilitation-Travaux de Component 2: Improving réhabilitation de la piste public infrastructure and Single Stage - One 530,000.0 477,122.4 2019-06- 2019-10- 2019-06- 2019-07- 2019-10- 2019-08- 2019-10- 2019-10- 2019-10- 2020- IDA / 61110 Post Request for Bids Open - National Signed Ewo -Ngami - Bia - Kébili the business climate for Envelope 0 2 14 04 19 31 16 30 17 04 28 04-01 dans le Département de la commercial agriculture Cuvette-Ouest CG-PDAC-398-T-ED-19 / Réhabilitation-Travaux de Component 2: Improving réhabilitation du Pont sur la public infrastructure and 585,000.0 663,442.4 2019-06- 2019-10- 2019-06- 2019-10- 2019-07- 2019-10- 2020- rivière Lébomi dans le IDA / 61110 Post Direct Selection Direct Signed the business climate for 0 8 14 01 19 03 24 28 01-20 Département de la Cuvette- commercial agriculture Ouest en Entente Directe avec la Société MBTP CG-PDAC-394-T-AO-18 / Travaux de réhabilitation et Component 2: Improving d'Aménagement des public infrastructure and Single Stage - One Complete 2019-06- 2018-10- 2019-06- 2019-07- 2018-11- 2019-08- 2018-12- 2019-09- 2019-01- 2020- IDA / 61110 Post Request for Bids Open - National 15,000.00 15,101.15 bureaux de l'Antenne the business climate for Envelope d 05 16 10 22 23 21 12 25 09 03-23 Départementale de commercial agriculture Planification et de Suivi du PDAC à NKAYI CG-PDAC-408-T-ED-19 / Component 2: Improving Réhabilitation-Travaux public infrastructure and 585,000.0 656,779.3 Complete 2019-06- 2019-10- 2019-06- 2019-10- 2019-07- 2019-10- 2020- d'ouverture de la piste IDA / 61110 Post Direct Selection Direct the business climate for 0 1 d 14 01 19 03 24 28 01-20 Tchivala-Louvenza avec la commercial agriculture Societe TRANSLOGISTIQUE CG-PDAC-403-T-ED-19 / Réhabilitation-Travaux de Component 2: Improving réhabilitation de la piste public infrastructure and 300,000.0 302,506.7 Complete 2019-06- 2019-10- 2019-06- 2019-10- 2019-07- 2019-10- 2020- Maboria-Odziba dans le IDA / 61110 Post Direct Selection Direct the business climate for 0 2 d 14 01 19 03 24 28 01-20 Département du Pool en commercial agriculture Entente Directe avec la Société CP CG-PDAC-423-T-PRIX-18 / Travaux de réhabilitation Component 2: Improving et d'Aménagement des public infrastructure and Request for Single Stage - One Complete 2019-07- 2019-09- 2019-01- 2020- IDA / 61110 Post Open - National 35,000.00 19,881.45 bureaux de l'Antenne the business climate for Quotations Envelope d 20 14 09 03-12 Départementale de commercial agriculture Planification et de Suivi du PDAC à Kinkala CG-PDAC-424-T-PRIX-18 / Travaux de réhabilitation Component 2: Improving et d'Aménagement des public infrastructure and Request for Single Stage - One Complete 2019-07- 2019-09- 2019-01- 2020- IDA / 61110 Post Open - National 20,000.00 19,512.33 bureaux de l'Antenne the business climate for Quotations Envelope d 20 14 09 03-12 Départementale de commercial agriculture Planification et de Suivi du PDAC à NGO CG-PDAC-426-T-PRIX-18 / Travaux de réhabilitation Component 2: Improving et d'Aménagement des public infrastructure and Request for Single Stage - One 200,000.0 Complete 2019-07- 2020-03- 2019-09- 2019-01- 2020- IDA / 61110 Post Open - National 97,778.04 bureaux de l'Unité Nationale the business climate for Quotations Envelope 0 d 20 21 14 09 03-12 de Coordination du PDAC à commercial agriculture Brazzaville CG-PDAC-427-T-PRIX-18 / Travaux de réhabilitation Component 2: Improving et d'Aménagement des public infrastructure and Request for Single Stage - One Complete 2019-07- 2020-03- 2019-09- 2019-01- 2020- IDA / 61110 Post Open - National 50,000.00 49,040.81 bureaux de l'Antenne the business climate for Quotations Envelope d 20 21 14 09 03-12 Départementale de commercial agriculture Planification et de Suivi du PDAC à Ouesso Page 1 CG-PDAC-431-T-ED-19 / Component 2: Improving Réhabilitation-Travaux de public infrastructure and 600,000.0 614,899.2 Complete 2019-08- 2019-10- 2019-08- 2019-10- 2019-09- 2019-10- 2020- réhabilitation de la piste IDA / 61110 Post Direct Selection Direct the business climate for 0 9 d 20 01 25 03 29 28 03-27 Tsiaki-Kimboto-Mahouobo commercial agriculture avec la Société EBCS CG-PDAC-432-T-ED-19 / Component 2: Improving Réhabilitation-Travaux de public infrastructure and 500,000.0 486,483.2 2019-08- 2019-10- 2019-08- 2019-10- 2019-09- 2019-10- 2020- réhabilitation de la piste IDA / 61110 Post Direct Selection Direct Signed the business climate for 0 2 20 01 25 04 29 28 03-27 Ewo-Ngami Bia-Kébili avec commercial agriculture la Société MBTP CG-PDAC-461-T-PRIX-19 Component 3: / Construction de 5 latrines Strengthening institutional Request for Single Stage - One Complete 2019-11- 2020-03- 2019-12- 2020-04- 2020- pour les populations IDA / 61110 capacity to support the Post Limited 40,000.00 28,506.26 Quotations Envelope d 05 17 31 29 06-28 autochtones beneficiaires development of commercial de micros projets 2018 du agriculture PDAC Component 2: Improving CG-PDAC-0082-T-PRIX- public infrastructure and Request for Single Stage - One 2018-07- 2018-08- 2019- 18 / Réhabilitation du IDA / 61110 Post Limited 10,000.00 0.00 Canceled the business climate for Quotations Envelope 04 29 02-25 circuit électrique du siège commercial agriculture CG-PDAC-393-AO-18 / Travaux de réhabilitation et Component 2: Improving d'Aménagement des public infrastructure and Single Stage - One 2019-06- 2018-10- 2019-06- 2019-06- 2019-07- 2018-11- 2019-08- 2018-12- 2019-09- 2020- IDA / 61110 Post Request for Bids Open - National 35,000.00 0.00 Canceled bureaux de l'Antenne the business climate for Envelope 05 22 10 12 22 23 21 06 25 03-23 Départementale de commercial agriculture Planification et de Suivi du PDAC à Kinkala CG-PDAC-392-T-AO-18 / Travaux de réhabilitation et Component 2: Improving d'Aménagement des public infrastructure and Single Stage - One 2019-06- 2019-06- 2019-07- 2019-08- 2019-09- 2020- IDA / 61110 Post Request for Bids Open - National 20,000.00 0.00 Canceled bureaux de l'Antenne the business climate for Envelope 05 10 22 21 25 03-23 Départementale de commercial agriculture Planification et de Suivi du PDAC à NGO CG-PDAC-395-T-AO-18 / Travaux de réhabilitation et Component 2: Improving d'Aménagement des public infrastructure and Single Stage - One 135,000.0 2019-06- 2019-06- 2019-07- 2019-08- 2019-09- 2020- IDA / 61110 Post Request for Bids Open - National 0.00 Canceled bureaux de l'Antenne the business climate for Envelope 0 05 10 22 21 25 03-23 Départementale de commercial agriculture Planification et de Suivi du PDAC à Pointe-Noire CG-PDAC-390-T-AO-18 / Travaux de réhabilitation et Component 2: Improving d'Aménagement des public infrastructure and Single Stage - One 100,000.0 2019-06- 2019-06- 2019-07- 2019-08- 2019-09- 2020- IDA / 61110 Post Request for Bids Open - National 0.00 Canceled bureaux de l'Unité Nationale the business climate for Envelope 0 05 10 22 21 25 03-23 de Coordination du PDAC à commercial agriculture Brazzaville CG-PDAC-391-T-AO-18 / Travaux de réhabilitation et Component 2: Improving d'Aménagement des public infrastructure and Single Stage - One 2019-06- 2019-06- 2019-07- 2019-08- 2019-09- 2020- IDA / 61110 Post Request for Bids Open - National 50,000.00 0.00 Canceled bureaux de l'Antenne the business climate for Envelope 05 10 22 21 25 03-23 Départementale de commercial agriculture Planification et de Suivi du PDAC à Ouesso CG-PDAC-514-AON-T-19 / Travaux de réhabilitation Component 2: Improving de la piste Pamba-Odzaka- public infrastructure and Single Stage - One 2,800,000. 1,478,475 2019-12- 2019-11- 2019-12- 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-03- 2020-02- 2020- IDA / 61110 Post Request for Bids Open - National Signed Okombé-Oko, dans le the business climate for Envelope 00 .70 06 27 11 04 22 07 21 09 27 05 09-23 district de Makoua commercial agriculture Département de la Cuvette CG-PDAC-460-T-ED-19 / Travaux de réhabilitation du bâtiment de l’Inspection Component 3: Générale de l’Agriculture, Strengthening institutional du Centre d’Appui et de Request for Single Stage - One 300,000.0 292,488.0 Complete 2020-01- 2020-03- 2020-03- 2020-03- 2020- IDA / 61110 capacity to support the Post Limited Réglementation des Quotations Envelope 0 3 d 20 10 16 30 09-12 development of commercial Producteurs de la Direction agriculture du Machinisme Agricole et de l’Aménagement et la Direction de la Coopération du MAEP CG-PDAC-518-T-ED-20 / Component 2: Improving Réhabilitation d’un petit public infrastructure and Request for Single Stage - One 210,000.0 186,681.7 2020-03- 2020-09- 2020-05- 2020-10- 2020- pont sur la rivière Nkankaya IDA / 61110 Post Limited Signed the business climate for Quotations Envelope 0 8 28 30 23 20 11-19 dans le département du commercial agriculture Pool avec la société SIPAM CG-PDAC-533-T-CF-20 / Component 2: Improving Entretien HIMO de la piste public infrastructure and Request for Single Stage - One Complete 2020-04- 2020-03- 2020-05- 2020-05- 2020- IDA / 61110 Post Limited 31,000.00 29,505.31 Itomba-Eboyo 2 dans le the business climate for Quotations Envelope d 05 12 31 04 11-27 Département des plateaux commercial agriculture CG-PDAC-534-T-CF-20 / Component 2: Improving Entretien HIMO de la piste public infrastructure and Request for Single Stage - One 2020-04- 2020-03- 2020-05- 2020-05- 2020- Ngouéné-Ngania-Okassa IDA / 61110 Post Limited 33,000.00 32,299.29 Signed the business climate for Quotations Envelope 05 12 31 20 11-27 dans le département des commercial agriculture Plateaux CG-PDAC-535-T-CF-20 / Component 2: Improving Entretien HIMO de la piste public infrastructure and Request for Single Stage - One 2020-04- 2020-03- 2020-05- 2020-05- 2020- IDA / 61110 Post Limited 30,000.00 26,835.25 Signed agricole Malolo-Dihessé the business climate for Quotations Envelope 05 12 31 04 11-27 dans le Département du commercial agriculture Niari CG-PDAC-536-T-ED-20 / Renouvellement contrat Component 2: Improving Entretien HIMO de la piste public infrastructure and 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020- Dzouama-Doubandzo- IDA / 61110 Post Direct Selection Direct 32,870.00 35,775.09 Signed the business climate for 31 16 05 17 10 30 11-06 Adingo avec l'ONG COEC, commercial agriculture dans le Département de la Cuvette-Ouest CG-PDAC-537-T-ED-20 / Renouvellement contrat Component 2: Improving Entretien HIMO de la piste public infrastructure and 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020- IDA / 61110 Post Direct Selection Direct 9,870.00 10,844.01 Signed Djambala-Abala-Ndolo avec the business climate for 31 16 05 17 10 30 11-06 l'ONG JEUNESSE ONARI, commercial agriculture dans le Département des Plateaux CG-PDAC-538-T-ED-20 / Renouvellement contrat Component 2: Improving Entretien HIMO de la piste public infrastructure and 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020- agricole Yonon-Ossa-Kialé IDA / 61110 Post Direct Selection Direct 17,320.00 18,931.40 Signed the business climate for 31 16 05 17 10 30 11-06 avec l'ONG JEUNESSE ONARI commercial agriculture dans le Département des Plateaux. CG-PDAC-539-T-ED-20 / Renouvellement contrat Component 2: Improving Entretien HIMO de la piste public infrastructure and 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020- IDA / 61110 Post Direct Selection Direct 32,870.00 35,775.09 Signed Ingah-Ingolo-Mah-Imvouba the business climate for 31 16 05 17 10 30 11-06 avec l'ONG JEUNESSE 2000, commercial agriculture dans le Département du Pool. CG-PDAC-540-T-ED-20 / Renouvellement contrat Component 2: Improving Entretien HIMO de la piste public infrastructure and 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020- IDA / 61110 Post Direct Selection Direct 36,470.00 31,883.40 Signed agricole Odziba-Dzion the business climate for 31 16 05 17 10 30 11-06 Dzion-Ingolo avec l'ONG commercial agriculture GPAP, dans le Département du Pool. CG-PDAC-541-T-ED-20 / Renouvellement contrat Component 2: Improving Entretien HIMO de la piste public infrastructure and 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020- agricole Massa-Maty centre- IDA / 61110 Post Direct Selection Direct 66,120.00 71,955.55 Signed the business climate for 31 16 05 17 10 30 11-06 Binikina avec le Groupement commercial agriculture Dzounda, dans le Département du Pool CG-PDAC-542-T-ED-20 / Renouvellement contrat Component 2: Improving Entretien HIMO piste public infrastructure and 2020-03- 2020-04- 2020-03- 2020-04- 2020-03- 2020-04- 2020- IDA / 61110 Post Direct Selection 17,570.00 19,235.44 Signed agricole Boko-Ngondzo the business climate for 31 16 31 17 31 30 03-31 avec l'ONG CRADDB, dans le commercial agriculture Département du Pool. CG-PDAC-543-T-ED-20 / Renouvellement contrat entretien HIMO de la piste Component 2: Improving agricole Kindzoumba- public infrastructure and 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020- IDA / 61110 Post Direct Selection Direct 27,820.00 30,484.83 Signed Kibamba avec la the business climate for 31 16 05 17 10 30 11-06 Coopérative Nté Ntélé et commercial agriculture l'ONG Mboungui Moubiri, dans le Département de la Bouenza. CG-PDAC-544-T-ED-20 / Renouvellement contrat Component 2: Improving Entretien piste agricole public infrastructure and 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020- Bouansa-Ngouédi-Kinzaba IDA / 61110 Post Direct Selection Direct 29,620.00 32,742.26 Signed the business climate for 31 16 05 17 10 30 11-06 et Bretelles avec le commercial agriculture Groupement Mwa Yaya, dans le Département de la Bouenza. CG-PDAC-519-T-PRIX-20 / Recrutement d’une ONG Component 2: Improving pour les travaux d’entretien public infrastructure and Request for Single Stage - One 2020-03- 2020-04- 2020- IDA / 61110 Post Limited 44,000.00 0.00 Canceled en HIMO de la piste Malolo- the business climate for Quotations Envelope 04 29 10-26 Dihessé dans le commercial agriculture département du Niari CG-PDAC-521-T-ED-20 / Renouvellement des Component 2: Improving contrats avec les ONG public infrastructure and 2020-02- 2020-02- 2020-02- 2020- ACTT et AIDD pour les IDA / 61110 Post Direct Selection 46,000.00 0.00 Canceled the business climate for 20 20 20 02-20 travaux d’entretien en HIMO commercial agriculture de la piste Itomba-Eboyo 2 dans le département des Plateaux CG-PDAC-422-T-PRIX-18 / Travaux de réhabilitation Component 2: Improving et d'Aménagement des public infrastructure and Request for Single Stage - One 2019-07- 2019-09- 2020- IDA / 61110 Post Open - National 15,000.00 0.00 Canceled bureaux de l'Antenne the business climate for Quotations Envelope 20 14 03-12 Départementale de commercial agriculture Planification et de Suivi du PDAC à NKAYI CG-PDAC-399-T-AO-19 / Réhabilitation-Travaux de Component 2: Improving réhabilitation de la piste public infrastructure and Single Stage - One 450,000.0 2019-06- 2019-06- 2019-07- 2019-08- 2019-10- 2020- IDA / 61110 Post Request for Bids Open - National 0.00 Canceled Issabi- Aporo-Mouengué - the business climate for Envelope 0 14 19 31 30 04 04-01 Ingouala et Ilebé dans le commercial agriculture Département de la Cuvette CG-PDAC-0383-T-DCF-19 Component 2: Improving / HIMO-Travaux d'entretien public infrastructure and Single Stage - One 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- 2019-07- 2019-08- 2019-09- 2020- IDA / 61110 Post Request for Bids Open - National 21,000.00 0.00 Canceled de la piste Malolo-Dihesse the business climate for Envelope 24 27 29 16 10 26 09 13 03-11 dans le Département du commercial agriculture Niari CG-PDAC-546-T-PRIX-19 / Entretien HIMO piste Les Component 2: Improving Saras-car Mboma/Aviation- public infrastructure and Request for Single Stage - One Complete 2020-07- 2019-09- 2020-09- 2019-10- 2021- IDA / 61110 Post Limited 12,000.00 6,436.16 Bondika dans le the business climate for Quotations Envelope d 20 06 14 17 03-13 Département du Kouilou (lot commercial agriculture 1) REGULARISATION CG-PDAC-T-550-PRIX-20 Component 3: / Réhabilitation du système Strengthening institutional Request for 200,000.0 168,578.8 2020-06- 2020-06- 2020-09- 2020- d’adduction d’eau de la IDA / 61110 capacity to support the Post Signed Quotations 0 0 30 30 21 06-30 station de recherche de development of commercial l’IRA à Loudima agriculture CG-PDAC-551-T-PRIX-20 Component 3: / Travaux de réhabilitation Strengthening institutional du laboratoire in vitro de Request for Single Stage - One 100,000.0 2020-07- 2020-08- 2020-08- 2020-12- 2021- IDA / 61110 capacity to support the Post Open - National 31,266.75 Signed l’Institut National de Quotations Envelope 0 05 06 30 04 02-26 development of commercial Recherche Agronomique agriculture (IRA) à Brazzaville CG-PDAC-552-T-PRIX-20 Component 3: / Aménagement des serres Strengthening institutional des laboratoires in vitro de Request for Single Stage - One 2020-07- 2020-08- 2020-08- 2020-09- 2021- IDA / 61110 capacity to support the Post Open - National 40,000.00 37,948.04 Signed Loudima et de Brazzaville Quotations Envelope 05 06 30 21 02-26 development of commercial pour l'Institut National de agriculture Recherche Agronomique (IRA) CG-PDAC-553-T-PRIX-20 Component 3: / Travaux d’aménagement Strengthening institutional des fermes piscicoles d’Ewo Request for Single Stage - One 120,000.0 452,697.5 2020-07- 2020-08- 2020-08- 2021-04- 2021- IDA / 61110 capacity to support the Post Open - National Signed dans le Département de la Quotations Envelope 0 0 05 20 30 19 02-26 development of commercial Cuvette-Ouest et de agriculture Madingou dans le Département de la Bouenza CG-PDAC-554-T-PRIX-20 Component 3: / Réhabilitation de la Ferme Strengthening institutional Request for Single Stage - One 2020-07- 2020-08- 2020-08- 2020-09- 2021- école de l’Ecole Nationale IDA / 61110 capacity to support the Post Open - National 50,000.00 80,740.19 Signed Quotations Envelope 05 07 30 21 02-26 Supérieure Agronomie et de development of commercial Foresterie (ENSAF) agriculture CG-PDAC-425-T-PRIX-18 / Travaux de réhabilitation Component 2: Improving et d'Aménagement des public infrastructure and Request for Single Stage - One 135,000.0 2019-07- 2019-09- 2020- IDA / 61110 Post Open - National 0.00 Canceled bureaux de l'Antenne the business climate for Quotations Envelope 0 20 14 03-12 Départementale de commercial agriculture Planification et de Suivi du PDAC à Pointe-Noire CG-PDAC-589-T-ED-20 / Réhabilitation de la piste Component 2: Improving Ewo-Engobé/ Mbeyi-Mbolo public infrastructure and 1,370,000. 1,127,641 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2021- IDA / 61110 Post Direct Selection Direct Signed dans le département de la the business climate for 00 .96 03 12 08 17 12 21 03-11 Cuvette-Ouest en Entente commercial agriculture directe avec la Société MBTP CG-PDAC-590-T-ED-20 / Réhabilitation de la piste Component 2: Improving Madingou-gare- public infrastructure and 1,084,000. 1,129,307 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2021- Matsiedi/Ouenzé-Bodissa- IDA / 61110 Post Direct Selection Direct Signed the business climate for 00 .01 03 12 08 17 12 08 03-11 Kayes dans le département commercial agriculture de la Bouenza par entente directe avec la Société EBCS CG-PDAC-591-T-ED-20 / Réhabilitation de la piste Component 2: Improving Eboyo 2-Okéké dans le public infrastructure and 1,000,000. 1,154,933 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-08- 2021- IDA / 61110 Post Direct Selection Direct Signed département des Plateaux the business climate for 00 .26 03 12 08 17 12 25 03-11 par Entente directe avec la commercial agriculture Société CP CG-PDAC-592-T-ED-20 / Réhabilitation de la piste Component 2: Improving Mahouobo-Zabata-Matsiti- public infrastructure and 1,000,000. 1,031,900 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2021- IDA / 61110 Post Direct Selection Direct Signed Nzansa dans le the business climate for 00 .57 03 12 08 17 12 08 03-11 département de la Bouenza commercial agriculture par Entente directe avec la Société EBCS CG-PDAC-593-T-AON-20 Component 2: Improving Pending / Travaux d’entretien des public infrastructure and Single Stage - One 500,000.0 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- 2021- IDA / 61110 Post Request for Bids Open - National 0.00 Implemen voies d’eau de la Ndéko et the business climate for Envelope 0 03 08 19 19 23 05-22 tation la Motaba, L’Ibenga commercial agriculture CG-PDAC-594-T-AON-20 Component 2: Improving / Réhabilitation de la piste public infrastructure and Single Stage - One 375,000.0 1,000,014 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-08- 2020-11- 2020-09- 2021- Impfondo-Djemba Brousse IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 0 .28 03 23 08 06 19 25 19 28 23 17 05-22 dans le département de la commercial agriculture Likouala CG-PDAC-595-T-AON-20 Component 2: Improving / Réhabilitation de la piste public infrastructure and Single Stage - One 917,000.0 505,843.1 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-08- 2020-11- 2020-09- 2021- Mielékekouka - Tala tala- IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 0 5 03 23 08 06 19 25 19 28 23 28 05-22 bolozzo dans le commercial agriculture département de la Sangha CG-PDAC-596-T-AON-20 Component 2: Improving / Réhabilitation de la piste public infrastructure and Single Stage - One 750,000.0 672,492.6 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-08- 2020-11- 2020-09- 2021- Owando-Ikongono-Ollendet IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 0 0 03 23 08 06 19 25 19 28 23 17 05-22 dans le département de la commercial agriculture Cuvette CG-PDAC-597-T-DCF-20 Component 2: Improving / Réhabilitation de la piste public infrastructure and Request for Single Stage - One 200,000.0 133,249.2 Complete 2020-08- 2020-08- 2020-10- 2020-09- 2021- IDA / 61110 Post Open - National Konosso-Endolou dans le the business climate for Quotations Envelope 0 6 d 08 06 03 14 04-01 département des Plateaux commercial agriculture CG-PDAC-598-T-AON-20 Component 2: Improving / Réhabilitation de la piste public infrastructure and Single Stage - One 609,000.0 585,908.7 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-08- 2020-11- 2020-09- 2021- Voka-Kimpanzou dans le IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 0 4 03 23 08 06 19 25 19 28 23 15 05-22 département dans le commercial agriculture département du Pool CG-PDAC-600-T-AON-20 Component 2: Improving / Construction des dalots public infrastructure and Single Stage - One 1,659,000. 1,096,172 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-08- 2020-11- 2020-09- 2021- sur la piste Lefoutou- IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 00 .06 03 23 08 06 19 25 19 28 23 17 05-22 Liwemé dans le commercial agriculture département de la Lékoumou Page 2 CG-PDAC-602-T-ED-20 / Component 2: Improving Construction d'une ligne Pending public infrastructure and 334,000.0 2020-08- 2020-08- 2020-09- 2021- électrique pour le CAT Inoni IDA / 61110 Post Direct Selection Direct 0.00 Implemen the business climate for 0 03 08 12 03-11 par Entente directe avec tation commercial agriculture la société E2C CG-PDAC-603-T-AON-20 Component 2: Improving Pending / Travaux d’aménagement public infrastructure and Single Stage - One 534,000.0 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- 2021- IDA / 61110 Post Request for Bids Open - National 0.00 Implemen des centres agro pastoraux the business climate for Envelope 0 03 08 19 19 23 05-22 tation intégrés commercial agriculture CG-PDAC-547-T-PRIX-19 / Entretien HIMO piste Les Component 2: Improving Saras-car Mboma/Aviation- public infrastructure and Request for Single Stage - One Complete 2020-07- 2019-09- 2020-08- 2019-10- 2021- IDA / 61110 Post Limited 12,000.00 8,066.78 Bondika dans le the business climate for Quotations Envelope d 05 05 30 17 02-26 Département du Kouilou (lot commercial agriculture 2) REGULARISATION CG-PDAC-549-T-PRIX-19 / Travaux de réhabilitation Component 2: Improving et d'Aménagement des public infrastructure and Request for Single Stage - One 135,000.0 Complete 2020-07- 2020-11- 2020-08- 2019-01- 2021- bureaux de l'Antenne IDA / 61110 Post Open - National 32,189.53 the business climate for Quotations Envelope 0 d 05 05 30 09 02-26 Départementale de commercial agriculture Planification et de Suivi du PDAC à Pointe-Noire REGULARISATION CG-PDAC-548-T-PRIX-19 / Entretien HIMO piste Les Component 2: Improving Saras-car Mboma/Aviation- public infrastructure and Request for Single Stage - One Complete 2020-07- 2019-09- 2020-08- 2019-10- 2021- IDA / 61110 Post Limited 12,000.00 4,083.60 Bondika dans le the business climate for Quotations Envelope d 05 05 30 17 02-26 Département du Kouilou (lot commercial agriculture 3) REGULARISATION CG-PDAC-601-T-AON-20 / Construction d'une ligne Component 2: Improving Pending électrique de l'agropole à public infrastructure and Single Stage - One 2,500,000. 2020-08- 2020-08- 2020-10- 2020-11- 2020-12- 2021- IDA / 61110 Post Request for Bids Open - National 0.00 Implemen Dihessé par Entente directe the business climate for Envelope 00 20 25 06 05 10 06-08 tation avec commercial agriculture la société E2C CG-PDAC-599-T-AON-20 Component 2: Improving / Réhabilitation de la piste public infrastructure and Single Stage - One 500,000.0 269,615.9 2020-08- 2020-08- 2020-08- 2020-08- 2020-10- 2020-09- 2020-11- 2020-09- 2020-12- 2020-10- 2021- Ditadi-Mikassou- Loudima- IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 0 3 20 17 25 20 06 17 05 21 10 15 06-08 gare dans le département commercial agriculture de la Bouenza CG-PDAC-623-T-CF-20 / Component 2: Improving Under Travaux Etretien HIMO de la public infrastructure and Request for Single Stage - One 2020-11- 2021-01- 2021- IDA / 61110 Post Limited 36,400.00 0.00 Implemen piste ODZIBA-MABORIA the business climate for Quotations Envelope 21 16 07-15 tation dans le Département du commercial agriculture Pool CG-PDAC-624-T-CF-20 / Component 2: Improving Travaux entretien HIMO public infrastructure and Request for Single Stage - One 2020-11- 2021-03- 2021-01- 2021-05- 2021- IDA / 61110 Post Limited 56,000.00 27,242.88 Signed piste Ngo-Adzi-Impé dans the business climate for Quotations Envelope 21 15 16 28 07-15 le Département des commercial agriculture plateaux CG-PDAC-625-T-CF-20 / Component 2: Improving Travaux entretien HIMO de public infrastructure and Request for Single Stage - One 2020-11- 2021-03- 2021-01- 2021-05- 2021- IDA / 61110 Post Limited 36,500.00 58,014.25 Signed la piste BOKO-MANDOMBE the business climate for Quotations Envelope 21 15 16 25 07-15 dans le Département du commercial agriculture POOL CG-PDAC-626-T-CF-20 / Component 2: Improving Travaux entretien HIMO public infrastructure and Request for Single Stage - One 2020-11- 2021-03- 2021-01- 2021-05- 2021- IDA / 61110 Post Limited 40,000.00 65,177.91 Signed piste KAYES-LOUAMBA dans the business climate for Quotations Envelope 21 15 16 25 07-15 le Département de la commercial agriculture Bouenza CG-PDAC-627-T-CF-20 / Component 2: Improving Travaux entretien HIMO public infrastructure and Request for Single Stage - One 2020-11- 2021-03- 2021-01- 2021-05- 2021- IDA / 61110 Post Limited 42,000.00 24,836.52 Signed piste Tsiaki-Kimboto dans the business climate for Quotations Envelope 21 15 16 25 07-15 le Département de la commercial agriculture Bouenza CG-PDAC-628-T-CF-20 / Component 2: Improving Travaux entretien HIMO public infrastructure and Request for Single Stage - One 2020-11- 2021-03- 2021-01- 2021-05- 2021- IDA / 61110 Post Limited 37,800.00 30,957.47 Signed piste Les Saras-Bondika the business climate for Quotations Envelope 21 15 16 25 07-15 dans le Département du commercial agriculture Kouilou Component 2: Improving CG-PDAC-629-T-CF-20 / public infrastructure and Request for Single Stage - One 2020-11- 2021-03- 2021-01- 2021-05- 2021- Travaux entretien HIMO IDA / 61110 Post Limited 63,000.00 86,062.26 Signed the business climate for Quotations Envelope 21 15 16 25 07-15 piste Pilikondi Bilala-Cacao commercial agriculture CG-PDAC-630-T-CF-20 / Component 2: Improving Travaux entretien HIMO public infrastructure and Request for Single Stage - One 2020-11- 2021-03- 2021-01- 2021-05- 2021- IDA / 61110 Post Limited 16,800.00 39,802.24 Signed piste Mavitou- Lac Cayo the business climate for Quotations Envelope 21 15 16 25 07-15 dans le Département du commercial agriculture Kouilou CG-PDAC-631-T-CF-20 / Component 2: Improving Travaux entretien HIMO public infrastructure and Request for Single Stage - One 2020-11- 2021-03- 2021-01- 2021-05- 2021- IDA / 61110 Post Limited 8,400.00 25,203.60 Signed piste Nkayi-Carrière Dolisie the business climate for Quotations Envelope 21 15 16 25 07-15 dans le Département de la commercial agriculture Bouenza CG-PDAC-634-T-AON-20 Component 2: Improving / Réhabilitation de la voie public infrastructure and Single Stage - One 450,000.0 131,460.4 2020-11- 2020-11- 2020-11- 2020-11- 2021-01- 2020-12- 2021-02- 2020-12- 2021-03- 2021-01- 2021- d'accès au centre maraîcher IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 0 8 16 09 21 24 02 08 01 09 08 16 09-04 de Soungui dans commercial agriculture l'arrodissement 8 Madibou CG-PDAC-620-T-CF-20 / Component 3: Rehabilitation du chateau et Strengthening institutional de la bache à eau du lycee Request for Single Stage - One 170,000.0 2020-11- 2020-10- 2021-01- 2021-01- 2021- IDA / 61110 capacity to support the Post Limited 40,234.34 Signed technique agricole de Quotations Envelope 0 21 27 16 11 07-15 development of commercial Ouesso dans le agriculture Departement de la Sangha CG-PDAC-616-T-AON-20 / TRAVAUX DE Component 2: Improving REHABILITATION DE LA public infrastructure and Single Stage - One 1,000,000. 2020-09- 2020-07- 2020-10- 2020-09- 2020-11- 2020-08- 2020-12- 2021-01- 2021- IDA / 61110 Post Request for Bids Open - National 0.00 Canceled PISTE KENGUE KIMBOTO the business climate for Envelope 00 30 24 05 23 16 25 16 20 07-19 DANS LE DISTRICT DE commercial agriculture ZANAGA DEPRATEMENT DE LA LEKOUMOU CG-PDAC-636-T-AON-20 Component 2: Improving / Travaux de réhabilitation public infrastructure and Single Stage - One 1,000,000. 394,417.5 2020-10- 2020-07- 2020-11- 2020-10- 2020-12- 2020-08- 2021-01- 2020-08- 2021-02- 2020-09- 2021- de la piste Kengué- IDA / 61110 Post Request for Bids Open - National Signed the business climate for Envelope 00 7 30 20 04 20 16 25 15 28 19 21 08-18 Kimboto, dans le commercial agriculture Département de la Lékoumou National CG-PDAC-657-T-DCF-21 Component 2: Improving Procurement / Réhabilitation du hangar Pending public infrastructure and Request for Single Stage - One Document - 1 2021-07- 2021-08- 2022- du site maraîcher de IDA / 61110 Post Limited 14,000.00 0.00 Implemen the business climate for Quotations Envelope Envelope 05 30 02-26 Nsoungui dans tation commercial agriculture process (Non l'arrondissement 8 Madibou Bank-SPD) National CG-PDAC-658-T-DCF-21 Component 2: Improving Procurement Pending / Travaux d’aménagement public infrastructure and Request for Single Stage - One Document - 1 100,000.0 2021-07- 2021-08- 2022- IDA / 61110 Post Limited 0.00 Implemen de l’accès au site maraîcher the business climate for Quotations Envelope Envelope 0 05 30 02-26 tation de Bikakoudi commercial agriculture process (Non Bank-SPD) National CG-PDAC-662-T-DCF-21 Component 2: Improving Procurement / HIMO Entretien HIMO de la Pending public infrastructure and Request for Single Stage - One Document - 1 2021-07- 2021-08- 2022- piste Tchivala Louvenza IDA / 61110 Post Limited 60,000.00 0.00 Implemen the business climate for Quotations Envelope Envelope 05 30 02-26 Mboubissi dans le tation commercial agriculture process (Non Département du Kouilou Bank-SPD) National Component 2: Improving Procurement CG-PDAC-663-T-DCF(21 / Pending public infrastructure and Request for Single Stage - One Document - 1 2021-07- 2021-08- 2022- HIMO Entretien HIMO de la IDA / 61110 Post Limited 96,000.00 0.00 Implemen the business climate for Quotations Envelope Envelope 05 30 02-26 piste Pamba Odzaka tation commercial agriculture process (Non Bank-SPD) National CG-PDAC-664-T-DCF-21 Component 2: Improving Procurement Pending / HIMO Entretien HIMO de la public infrastructure and Request for Single Stage - One Document - 1 2021-07- 2021-08- 2022- IDA / 61110 Post Limited 45,200.00 0.00 Implemen piste Dibéni Passi Passi RN1 the business climate for Quotations Envelope Envelope 05 30 02-26 tation dans le Département du commercial agriculture process (Non Niari Bank-SPD) National CG-PDAC-665-T-DCF-21 Component 2: Improving Procurement Pending / HIMO Entretien HIMO de la public infrastructure and Request for Single Stage - One Document - 1 2021-07- 2021-08- 2022- IDA / 61110 Post Limited 58,600.00 0.00 Implemen piste Passi Passi 6 the business climate for Quotations Envelope Envelope 05 30 02-26 tation manguiers, dans le commercial agriculture process (Non Département du Niari Bank-SPD) National CG-PDAC-666-T-DCF-21 Component 2: Improving Procurement Pending / HIMO Entretien HIMO piste public infrastructure and Request for Single Stage - One Document - 1 2021-07- 2021-08- 2022- IDA / 61110 Post Limited 36,000.00 0.00 Implemen Konosso Endolo, dans le the business climate for Quotations Envelope Envelope 05 30 02-26 tation Département de la Cuvette commercial agriculture process (Non Bank-SPD) National CG-PDAC-667-T-DCF-21 Component 2: Improving Procurement Pending / HIMO Entretien HIMO voie public infrastructure and Request for Single Stage - One Document - 1 160,000.0 2021-07- 2021-08- 2022- IDA / 61110 Post Limited 0.00 Implemen d’eau de la Motaba; dans le the business climate for Quotations Envelope Envelope 0 05 30 02-26 tation Département de la Likouala commercial agriculture process (Non Bank-SPD) National CG-PDAC-668-T-DCF-21 Component 2: Improving Procurement Pending / HIMO Entretien HIMO voie public infrastructure and Request for Single Stage - One Document - 1 160,000.0 2021-07- 2021-08- 2022- IDA / 61110 Post Limited 0.00 Implemen d’eau de la Libenga, dans le the business climate for Quotations Envelope Envelope 0 05 30 02-26 tation Département de la Likouala commercial agriculture process (Non Bank-SPD) CG-PDAC-669-T-DCF-21 National / HIMO Entretien HIMO des Component 2: Improving Procurement Pending canaux de la Ndéko, Konda, public infrastructure and Request for Single Stage - One Document - 1 160,000.0 2021-07- 2021-08- 2022- IDA / 61110 Post Limited 0.00 Implemen Hypo, Mbandza, Sengolo, the business climate for Quotations Envelope Envelope 0 05 30 02-26 tation Mankenegué-Boueni, dans commercial agriculture process (Non le département de la Bank-SPD) Cuvette National CG-PDAC-681-T-DCF-20 Component 2: Improving Procurement Pending / HIMO Entretien HIMO de la public infrastructure and Request for Single Stage - One Document - 1 2021-07- 2021-08- 2022- IDA / 61110 Post Limited 45,400.00 0.00 Implemen piste Odziba Maboria, dans the business climate for Quotations Envelope Envelope 05 30 02-26 tation le Département du Pool commercial agriculture process (Non Bank-SPD) GOODS Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificatio Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process n (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual for Award Planned Actual Planned Actual CG-PDAC-001-F-CF-17 / Component 3: Under Equipements informatiques Strengthening institutional Single Stage - One 2017-10- 2017-10- 2017-10- 2017-10- 2017-11- 2017-11- 2017-11- 2017-11- 2017-12- 2018-02- IDA / V0400 Post Request for Bids Limited 50,000.00 0.00 Implement et mobilier de bureau pour capacity to support the Envelope 10 23 15 23 14 08 19 23 15 13 ation l'UNCP et ADPS development of commercial agriculture CG-PDAC-010-F-ED / Component 3: logiciel-Acquisition du Strengthening institutional logiciel de gestion 2017-08- 2017-09- 2017-09- 2017-10- 2017-10- 2017-10- 2017-12- 2019-12- IDA / V0400 capacity to support the Post Direct Selection Direct 50,000.00 61,172.53 Completed financière et de suivi 29 07 03 11 24 18 23 31 development of commercial évaluation (installation agriculture paramétrage et formation du personnel CG-PDAC-009-F-ED / Component 3: Fibre optique-Acquisition Strengthening institutional 2017-02- 2017-10- 2017-02- 2017-10- 2017-03- 2017-05- 2018-04- 2017-05- IDA / V0400 Post Direct Selection Direct 50,000.00 26,664.42 Completed de la connexion Internet par capacity to support the 01 19 06 06 23 01 30 31 fibre optique pour l'UNCP development of commercial du PDAC agriculture CG-PDAC-0013-F-CF-17 / Component 3: Equipement informatique et Strengthening institutional Request for Single Stage - One 2017-10- 2017-12- 2018-02- IDA / 61110 Post Open - National 50,000.00 0.00 Canceled mobilier de bureau pour capacity to support the Quotations Envelope 21 26 24 l'UNCP et ADPS du PDAC development of commercial agriculture CG-PDAC-0014-F-ED-17 / Component 3: Acquisition de la ligne de Strengthening institutional 2017-10- 2017-10- 2017-10- 2017-10- 2017-11- 2017-11- 2018-10- IDA / 61110 Post Direct Selection Direct 10,000.00 2,472.68 Signed connexion internet de capacity to support the 16 24 19 30 03 02 29 secours pour l'UNCP development of commercial duPDAC agriculture Component 3: CG-PDAC-0016-F-CF-17 / Strengthening institutional Request for Single Stage - One 2017-10- 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- Confection des enseignes IDA / 61110 Post Limited 25,000.00 1,913.35 Completed capacity to support the Quotations Envelope 30 06 15 18 14 12 de l'UNCP du PDAC development of commercial agriculture CG-PDAC-0074-F-PRIX-18 Component 3: Under / Acquisition internet pour Strengthening institutional Request for Single Stage - One 2018-06- 2018-08- 2018-07- 2019-01- IDA / 61110 Post Limited 12,000.00 0.00 Implement l'Antenne départementale capacity to support the Quotations Envelope 05 20 31 27 ation du PDAC à Nkayi development of commercial agriculture CG-PDAC-0077-F-PRIX-18 Component 3: Under / Acquisition internet pour Strengthening institutional Request for Single Stage - One 2018-07- 2018-08- 2018-08- 2019-02- IDA / 61110 Post Limited 12,000.00 0.00 Implement l'Antenne départementale capacity to support the Quotations Envelope 03 20 28 24 ation du PDAC à Ngo development of commercial agriculture CG6PDAC-0078-F-PRIX-18 Component 3: Under / Acquisition internet pour Strengthening institutional Request for Single Stage - One 2018-07- 2018-08- 2018-08- 2019-02- IDA / 61110 Post Limited 12,000.00 0.00 Implement l'Antenne départementale capacity to support the Quotations Envelope 03 20 28 24 ation du PDAC à Kinkala development of commercial agriculture CG-PDAC-0079-F-PRIX-18 Component 3: Under / Acquisition internet de Strengthening institutional Request for Single Stage - One 2018-10- 2018-08- 2018-11- 2019-05- IDA / 61110 Post Limited 12,000.00 0.00 Implement l'Antenne départementale capacity to support the Quotations Envelope 05 20 30 29 ation du PDAC à Ouesso development of commercial agriculture CG-PDAC-0080-F-AON- Component 3: Under 18 / Acquisition des Strengthening institutional Single Stage - One 2018-06- 2018-06- 2018-07- 2018-08- 2018-08- 2018-08- 2018-09- 2018-09- 2018-10- 2019-04- IDA / 61110 Post Request for Bids Limited 100,000.00 0.00 Implement équipements informatiques capacity to support the Envelope 28 29 03 03 14 23 13 12 18 16 ation complémentaires du PDAC development of commercial agriculture CG-PDAC-0088-F-PRIX-18 Component 3: Under / Acquisition de 5 tableaux Strengthening institutional Request for Single Stage - One 2018-07- 2019-01- 2018-09- 2018-10- IDA / 61110 Post Limited 10,000.00 0.00 Implement muraux pour le PDAC et le capacity to support the Quotations Envelope 09 23 03 03 ation MAEP. development of commercial agriculture CG-PDAC-0106-F-AON- Component 3: 18 / Acquisition de 6 Strengthening institutional Single Stage - One 2018-06- 2018-12- 2018-07- 2018-12- 2018-08- 2019-01- 2018-09- 2019-01- 2018-10- 2019-02- 2019-04- 2019-05- véhicules de terrain 4x4 IDA / 61110 capacity to support the Post Request for Bids Limited 360,000.00 402,301.05 Completed Envelope 28 21 03 21 14 04 13 14 18 08 16 16 pour l'UNCP et les antennes development of commercial de Nkayi et Ouesso du agriculture PDAC CG-PDAC-0064-F-PRIX-18 Component 3: Under / Acquisition internet pour Strengthening institutional Request for Single Stage - One 2018-07- 2018-08- 2018-09- 2019-03- IDA / 61110 Post Limited 12,000.00 0.00 Implement l'Antenne départementale capacity to support the Quotations Envelope 30 20 24 23 ation du PDAC de Pointe-Noire development of commercial agriculture Component 3: CG-PDAC-0114-F-PRIX-18 Under Strengthening institutional Request for Single Stage - One 2018-09- 2019-01- 2018-10- 2018-10- / Création et hébergement IDA / 61110 Post Limited 10,000.00 0.00 Implement capacity to support the Quotations Envelope 15 23 19 26 du site Internet du PDAC ation development of commercial agriculture CG-PDAC-0139-F- PRIX- Component 1: Direct 18 / Acquisition du matériel support to producer Request for Single Stage - One 2018-12- 2019-01- 2019-01- 2019-03- 2019-07- 2019-04- de suivi électronique des IDA / 61110 groups and agribusiness Post Open - National 12,000.00 57,329.09 Completed Quotations Envelope 01 24 26 21 25 10 prestataires chargés suivi micro, small and medium des plans d'affaires en enterprises (MSMEs) 2019 CG-PDAC-140-F-AON-18 Component 3: / Acquisition de 100 motos Strengthening institutional Single Stage - One 2018-12- 2019-03- 2018-12- 2019-07- 2019-01- 2019-06- 2019-02- 2019-06- 2019-03- 2019-07- 2019-09- 2020-02- pour les prestataires IDA / 61110 capacity to support the Post Request for Bids Open - National 500,000.00 546,524.01 Completed Envelope 05 26 10 18 21 07 20 20 27 08 23 10 chargés de suivi et development of commercial encadrement de plan agriculture d'affaires CG-PDAC-0198-PRIX-19 / Component 3: Acquisition de 5 enseignes Strengthening institutional Under pour les Antennes Request for Single Stage - One 2019-01- 2019-01- 2019-03- 2019-09- IDA / 61110 capacity to support the Post Limited 5,000.00 0.00 Implement départementales de Quotations Envelope 12 23 09 05 development of commercial ation planification et de suivi du agriculture PDAC CG-PDAC-138-F-ED-18 / Acquisition d'un système du SE électronique avec une Component 3: base de données à Strengthening institutional référence spéciale pour la 2018-12- 2019-03- 2018-12- 2019-04- 2019-01- 2019-05- 2019-07- IDA / 61110 capacity to support the Post Direct Selection Direct 100,000.00 60,469.58 Signed collecte de données sur le 20 28 25 01 29 21 28 development of commercial suivi des effets et impacts agriculture du PDAC (formation et assistance des utilisateurs) avec le cabinet OM CONSULTING CG-PDAC-0349-F-ED-19 / Component 3: Expérimentation des Strengthening institutional 2019-03- 2019-04- 2019-03- 2019-05- 2019-05- 2019-06- 2019-10- biofertilisants par avec le IDA / 61110 capacity to support the Post Direct Selection Direct 40,000.00 21,710.35 Signed 24 24 29 03 03 11 30 groupement des tâcherons development of commercial au Congo-LIAMBOU Giselle agriculture CG-PDAC-0355-F-ED-19 / Acquisition de 40 véhicules Component 3: 4x4 double cabine pour les Strengthening institutional Under 2019-04- 2019-06- 2019-04- 2020-09- 2019-05- 2019-11- Directeurs départementaux IDA / 61110 capacity to support the Prior Direct Selection Direct 2,000,000.00 0.00 Review 18 28 23 23 28 24 du Ministère de lAgriculture development of commercial de lElevage et de la Peche agriculture avec CFAO CONGO Page 3 CG-PDAC-0368-F-DCF-19 Component 3: / Acquisition du mobilier de Strengthening institutional Single Stage - One 2019-05- 2019-05- 2019-05- 2019-07- 2019-08- 2019-07- 2019-08- 2019-09- 2019-09- 2020-03- 2019-09- IDA / 61110 Post Request for Bids Open - National 84,000.00 43,259.94 Completed bureau pour le personnel capacity to support the Envelope 15 28 20 01 06 31 22 04 20 02 28 complémentaire du PDAC development of commercial agriculture CG-PDAC-449-F-DCF-19 / Component 3: Acquisition des Strengthening institutional équipements informatiques Request for Single Stage - One 2019-10- 2019-12- 2019-12- 2020-06- IDA / 61110 capacity to support the Post Open - National 170,000.00 67,850.04 Signed et fournitures de bureau Quotations Envelope 16 11 27 08 development of commercial des services technique du agriculture MAEP (DMAA DAPR Direction du contôle CG-PDAC-456-F-CF-19 / Component 3: Acquisition dun tracteur Strengthening institutional Request for Single Stage - One 2019-10- 2019-12- 2019-12- 2019-12- 2020-06- IDA / 61110 Post Limited 140,000.00 80,840.96 Signed pour le lycee technique capacity to support the Quotations Envelope 29 02 24 28 21 agricole de Brazzaville development of commercial agriculture CG-PDAC-457-F-CF-19 / Component 3: Acquisition du materiel Strengthening institutional aratoire et des motoculteurs Request for Single Stage - One 2019-10- 2019-12- 2019-12- 2020-01- 2020-06- IDA / 61110 capacity to support the Post Limited 30,000.00 37,262.42 Signed pour le lycee technique Quotations Envelope 30 02 25 06 22 development of commercial agricole de ouesso dans le agriculture Departement de la Sangha CG-PDAC-462-F-PRIX-19 Component 3: / Acquisition des Strengthening institutional Request for Single Stage - One 2019-11- 2019-12- 2019-12- 2019-12- 2020-06- fournitures scolaires des IDA / 61110 capacity to support the Post Limited 20,000.00 49,356.90 Signed Quotations Envelope 05 02 31 27 28 eleves et ecoliers de 20 development of commercial villages des populations agriculture autochtones CG-PDAC-458-F-CF-19 / Component 3: Acquisition des Strengthening institutional Request for Single Stage - One 2019-11- 2020-01- 2020-07- equipements informatiques IDA / 61110 capacity to support the Post Open - National 60,000.00 0.00 Canceled Quotations Envelope 09 04 02 et de bureau du Ministère development of commercial de lAgriculture de lElevage agriculture et de la peche (MAEP) CG-PDAC-448-F-AON-19 / Acquisition du matériel Component 3: des laboratoires des lycées Strengthening institutional Single Stage - One 2019-10- 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-01- 2020-08- agricoles et de l Ecole IDA / 61110 capacity to support the Post Request for Bids Open - National 100,000.00 48,550.46 Signed Envelope 31 28 05 17 16 16 07 20 17 18 Nationale Supérieure d development of commercial Agronomie et de Foresterie agriculture (ENSAF) CG-PDAC-463-F-ED-19 / Component 3: Augmentation de la Strengthening institutional Under connectivité internet de l 2019-10- 2020-03- 2019-11- 2020-03- 2019-12- 2020-06- IDA / 61110 capacity to support the Post Direct Selection Direct 9,600.00 0.00 Implement Unité Nationale de 31 06 05 06 10 07 development of commercial ation Coordination du PDAC avec agriculture la Société Congo telecom CG-PDAC-525-F-ED-20 / Component 3: Acquisition d’un véhicule Strengthening institutional 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-03- 2020-09- 2020-05- IDA / 61110 Post Direct Selection Direct 60,000.00 45,277.38 Completed 4x4 pour l’Institut de capacity to support the 20 09 25 09 31 19 27 11 Recherche Agronomique development of commercial (IRA) agriculture CG-PDAC-F-526-PRIX-20 Component 3: / Acquisition des Strengthening institutional équipements informatiques Request for Single Stage - One 2020-02- 2020-03- 2020-04- 2020-04- 2020-10- 2020-07- IDA / 61110 capacity to support the Post Limited 160,000.00 63,027.99 Completed des Directeurs Quotations Envelope 25 16 21 29 18 21 development of commercial départementaux du MAEP et agriculture des Populations Autochtones et de 5 groupes électrogènes CG-PDAC-527-F-PRIX-20 Component 3: / Acquisition des Strengthening institutional Request for Single Stage - One 2020-03- 2020-03- 2020-04- 2020-04- 2020-10- 2020-07- IDA / 61110 Post Limited 80,000.00 76,577.07 Completed équipements nautiques capacity to support the Quotations Envelope 04 19 29 29 26 22 pour les CSA des zones development of commercial aquatiques agriculture CG-PDAC-531-F-ED-20 / Component 3: Recrutement du journal Les Strengthening institutional 2020-02- 2020-03- 2020-03- 2020-03- 2020-04- 2020-05- 2020-10- IDA / 61110 Post Direct Selection Direct 12,000.00 3,511.16 Signed Dépêches de Brazzaville capacity to support the 28 13 04 16 08 13 05 pour la publication de PDAC development of commercial INFOS agriculture CG-PDAC-524-F-ED-20 / Component 3: Acquisition d’un tracteur de Strengthening institutional Request for Single Stage - One 2020-03- 2020-03- 2020-05- 2020-04- 2020-11- 2020-08- 110 CV avec accessoires et IDA / 61110 capacity to support the Post Limited 140,000.00 119,735.90 Completed Quotations Envelope 28 19 23 29 19 29 2 triporteurs pour l’IRA avec development of commercial la Grande Quincaillerie agriculture CG-PDAC-545-F-ED-20 / Renouvellement contrat Component 3: acquisition et installation Strengthening institutional 2020-03- 2020-03- 2020-04- 2020-03- 2020-05- 2020-03- 2020-11- d'une ligne internet de IDA / 61110 capacity to support the Post Direct Selection Direct 2,500.00 2,191.36 Signed 31 09 05 13 10 30 06 secours auprès de development of commercial l'Assistante de direction et agriculture du Coordonnateur du PDAC CG-PDAC-F-0081-AON- Component 3: 18 / Acquisition du mobilier Strengthening institutional Single Stage - One 2018-06- 2019-03- 2018-07- 2018-08- 2018-09- 2018-10- 2019-04- IDA / 61110 Post Request for Bids Limited 100,000.00 0.00 Canceled de bureau pour le personnel capacity to support the Envelope 28 27 03 14 13 18 16 complémentaire du PDAC development of commercial agriculture CG-PDAC-555-F-PRIX-20 Component 3: / Acquisition des outils et Strengthening institutional intrants pour la ferme-école Request for Single Stage - One 2020-07- 2020-08- 2020-08- 2020-09- 2021-02- IDA / 61110 capacity to support the Post Open - National 56,000.00 40,421.40 Signed de l’Ecole Nationale Quotations Envelope 05 18 30 22 26 development of commercial Supérieure d’Agronomie et agriculture de Foresterie (ENSAF) CG-PDAC-606-F-PRIX-20 Component 3: / Acquisition du matériel de Strengthening institutional Request for Single Stage - One 2020-08- 2020-07- 2020-10- 2020-09- 2021-04- IDA / 61110 Post Limited 25,000.00 38,985.97 Signed laboratoire du Centre capacity to support the Quotations Envelope 08 21 03 22 01 National des Etudes de sols development of commercial agriculture CG-PDAC-614-F-PRIX-20 Component 3: / Acquisition du mobilier de Strengthening institutional bureau du bâtiment des Request for Single Stage - One 2020-08- 2020-12- 2020-10- 2021-01- 2021-04- IDA / 61110 capacity to support the Post Limited 100,000.00 68,254.15 Signed services (DMAA, DGA) du Quotations Envelope 08 17 03 28 01 development of commercial Ministère de l'Agriculture de agriculture l'Elevage et de la Pêche (MAEP) CG-PDAC-615-F-ED-20 / Acquisition du système informatisé de gestion comptable et de suivi Component 3: évaluation: achat du Strengthening institutional 2020-08- 2020-09- 2020-09- 2020-09- 2020-10- 2020-11- 2021-04- logiciel, paramétrage, IDA / 61110 capacity to support the Post Direct Selection Direct 140,000.00 129,374.15 Signed 31 23 05 29 10 17 08 migration des bases de development of commercial données du système agriculture SUCCES vers Tom2pro et Tom2 monitiring, formation, maintenance, avec la Société TOMATE CG-PDAC-617-F-ED-20 / ACQUISITION DES Component 3: EQUIPEMENTS NAUTIQUES Strengthening institutional POUR LES PRESTATAIRES DE 2020-09- 2020-10- 2020-09- 2020-10- 2020-09- 2020-12- 2020-09- IDA / 61110 capacity to support the Post Direct Selection 80,000.00 86,905.28 Signed SUIVI ENCADREMENT DES 30 21 30 26 30 17 30 development of commercial PLANS D'AFFAIRES DES agriculture ZONES FLUVIALES AVEC LA SOCIETE 7RICHFINDER INTERNATIONAL CG-PDAC-619-F- DEMANDE DE PRIX-2020 / Component 2: Improving ACQUISITION DES public infrastructure and Request for Single Stage - One 2020-10- 2020-12- 2020-12- 2021-01- 2021-06- IDA / 61110 Post Limited 40,000.00 31,352.75 Signed EQUIPEMENTS the business climate for Quotations Envelope 20 03 15 11 13 INFORMATIQUES POUR LES commercial agriculture DOUZE CONSEILS DEPARTEMENTAUX CG-PDAC-617-F-CF-20 / Component 3: Acquisition des produits de Strengthening institutional Request for Single Stage - One 2020-11- 2021-04- 2021-01- 2021-05- 2021-07- lutte contre les épizooties IDA / 61110 capacity to support the Post Limited 59,000.00 80,528.07 Signed Quotations Envelope 21 29 16 31 15 pour le compte de la development of commercial Direction Generale de l agriculture elevage du MAEP CG-PDAC-618-F-AON-20 Component 3: / Acquisition des Strengthening institutional Pending équipements d'insémination Open - Single Stage - One 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- IDA / 61110 capacity to support the Post Request for Bids 250,000.00 0.00 Implement artificielle pour le compte International Envelope 16 21 02 01 08 04 development of commercial ation du Ministère d' l agriculture agriculture de l elevage et de la pecche (MAEP) CG-PDAC-619-F-CF-20 / Component 3: Acquisition des Strengthening institutional equipements et materiel Request for Single Stage - One 2020-11- 2020-10- 2021-01- 2020-12- 2021-07- 2020-12- IDA / 61110 capacity to support the Post Limited 8,500.00 1,245.34 Completed techniques d elevage pour Quotations Envelope 21 27 16 04 15 09 development of commercial le Centre de vulgarisation agriculture des techniques d elevage (CVTE) CG-PDAC-622-F-CF-20 / Component 3: Acquisition de 3 triporteurs Strengthening institutional Request for Single Stage - One 2020-11- 2020-10- 2021-01- 2020-12- 2021-07- pour les fermes IDA / 61110 capacity to support the Post Limited 7,500.00 9,065.86 Signed Quotations Envelope 21 27 16 03 15 semencières du Centre development of commercial National des semences agriculture améliorées (CNSA) CG-PDAC-634-F-CF-20 / Component 3: Acquisition de 2 véhicule de Strengthening institutional Request for Single Stage - One 2020-11- 2020-10- 2021-01- 2020-12- 2021-07- 2021-01- terrain pour Agricongo et le IDA / 61110 capacity to support the Post Limited 100,000.00 100,386.87 Completed Quotations Envelope 21 27 16 17 15 22 Centre national de development of commercial semences améliorées agriculture (CNSA) CG-PDAC-618-F- DEMANDE DE PRIX-2020 / Component 2: Improving ACQUISITION DES MOTOS public infrastructure and Request for Single Stage - One 2020-10- 2020-12- 2021-06- POUR LES DOUZE CONSEILS IDA / 61110 Post Limited 135,000.00 0.00 Canceled the business climate for Quotations Envelope 20 15 13 DEPARTEMENTAUX ET LES commercial agriculture FERMES SEMENCIERES DU CENTRE NATIONAL DES SEMENCES AMELIOREES CG-PDAC-670-F-DCF-21 / Acquisition des outils Component 3: aratoires des lycées Strengthening institutional Pending techniques agricoles Request for Single Stage - One 2021-07- 2021-08- 2022-02- IDA / 61110 capacity to support the Post Limited 40,000.00 0.00 Implement d’Ongogni, Ewo et de Sibiti Quotations Envelope 05 30 26 development of commercial ation dans les Département des agriculture Plateaux, Cuvette-Ouest et Lékoumou CG-PDAC-671-F-DCF-21 / Component 3: Acquisition des Strengthening institutional Pending reproducteurs porc, des Request for Single Stage - One 2021-07- 2021-08- 2022-02- IDA / 61110 capacity to support the Post Limited 40,000.00 0.00 Implement poussins de ponte et de Quotations Envelope 05 30 26 development of commercial ation chair, de l’aliment de bétail agriculture pour la ferme-école de l’Ecole de l'ENSAF CG-PDAC-679-F-21 / Component 3: Pending Production et publication du Strengthening institutional Request for Single Stage - One 2021-07- 2021-08- 2022-02- IDA / 61110 Post Limited 10,000.00 0.00 Implement journal "PDAC Info par une capacity to support the Quotations Envelope 05 30 26 ation imprimerie locale development of commercial agriculture NON CONSULTING SERVICES Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificatio Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process n (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual CG-PDAC-0107-A-ED-18 / RENOUVELLEMENT CONTRAT RELATIF A Component 3: L'ENTRETIEN DES LOCAUX Strengthening institutional 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2019-07- 2018-06- DE L'UNITE NATIONALE DE IDA / 61110 capacity to support the Post Direct Selection Direct 2,400.00 2,081.66 Completed 31 15 05 15 10 20 10 20 COORDINATION DU PROJET development of commercial D'APPUI AU agriculture DEVELOPPEMENT DE L'AGRICULTURE COMMERCIALE (PDAC) CG-PDAC-0108-A-ED-18 / RENOUVELLEMENT CONTRAT RELATIF A Component 3: MAINTENANCE DU GROUPE Strengthening institutional 2018-05- 2018-06- 2018-06- 2018-07- 2018-06- 2019-07- 2018-06- ELECTROGENE DE L'UNITE IDA / 61110 capacity to support the Post Direct Selection Direct 1,200.00 1,040.83 Completed 31 19 05 10 20 10 20 NATIONALE DE development of commercial COORDINATION DU PROJET agriculture D'APPUI AU DEVELOPPEMENT DE L'AGRICULTURE COMMERCIALE (PDAC) CG-PDAC-0109-A-ED-18 / RENOUVELLEMENT CONTRAT RELATIF AU Component 3: RAMASSAGE DES ORDURES Strengthening institutional 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2019-01- 2018-06- SOLIDES AU SIEGE DE IDA / 61110 capacity to support the Post Direct Selection Direct 480.00 416.33 Completed 31 15 05 15 10 20 06 20 L'UNITE NATIONALE DE development of commercial COORDINATION DU PROJET agriculture D'APPUI AU DEVELOPPEMENT DE L'AGRICULTURE COMMERCIALE (PDAC) CG-PDAC-0110 / RENOUVELLEMENT CONTRAT RELATIF A LA Component 3: MAINTENANCE DES Strengthening institutional 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2019-01- 0031-04- PHOTOCOPIEURS DE L'UNITE IDA / 61110 capacity to support the Post Direct Selection Direct 1,200.00 1,040.83 Completed 31 15 05 15 10 20 06 18 NATIONALE DE development of commercial COORDINATION DU PROJET agriculture D'APPUI AU DEVELOPPEMENT DE L'AGRICULTURE COMMERCIALE (PDAC) CG-PDAC-0111-A-ED-18 / RENOUVELLEMENT CONTRAT RELATIF AU Component 3: SERVICE DE GARIENNAGE AU Strengthening institutional 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2019-01- 0025-11- SIEGE L'UNITE DE IDA / 61110 capacity to support the Post Direct Selection Direct 8,640.00 7,419.95 Completed 31 15 05 15 10 20 06 09 COORDINATION DU PROJET development of commercial D'APPUI AU agriculture DEVELOPPEMENT DE L'AGRICOLE COMMERCIALE (PDAC) CG-PDAC-410-A-ED-19 / Renouvellement contrat Component 3: gardienage des locaux de Strengthening institutional l'Unité de Coordination 2019-06- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- 2020-01- IDA / 61110 capacity to support the Post Direct Selection Direct 9,300.00 9,390.08 Signed Nationale du Projet dAppui 06 28 11 29 16 01 12 development of commercial au Developpement de agriculture lAgriculture Commerciale PDAC avec la société PROSEC CG-PDAC-409-A-ED-19 / Renouvellement contrat entretien des locaux de Component 3: l'Unité de Coordination Strengthening institutional 2019-06- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- 2020-01- Nationale du Projet dAppui IDA / 61110 capacity to support the Post Direct Selection Direct 3,000.00 3,029.06 Signed 06 28 11 29 16 01 12 au Developpement de development of commercial lAgriculture Commerciale agriculture PDAC avec Monsieur BITOUALA Donatien CG-PDAC-421-A-ED-19 / Renouvellement contrat maintenance des Component 3: photocopieurs de lUnité de Strengthening institutional 2019-06- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- 2020-01- Coordination Nationale du IDA / 61110 capacity to support the Post Direct Selection Direct 1,200.00 1,217.44 Signed 06 28 11 29 16 01 12 Projet dAppui au development of commercial Developpement de agriculture lAgriculture Commerciale PDAC avec MR SENGA Jean CG-PDAC-413-A-ED-19 / Renouvellement contrat maintenance du groupe Component 3: electrogene de lUnité de Strengthening institutional Coordination Nationale du 2019-06- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- 2020-01- IDA / 61110 capacity to support the Post Direct Selection Direct 1,200.00 1,217.44 Signed Projet dAppui au 06 28 11 29 16 01 12 development of commercial Developpement de agriculture lAgriculture Commerciale PDAC avec MR POATY Henri Blaise CG-PDAC-411-A-ED-19 / Renouvellement contrat ramassage des ordures Component 3: solides au siege de l'Unité Strengthening institutional 2019-06- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- 2020-01- de Coordination Nationale IDA / 61110 capacity to support the Post Direct Selection Direct 800.00 807.75 Signed 06 28 11 29 16 01 12 du Projet dAppui au development of commercial Developpement de agriculture lAgriculture Commerciale PDAC avec lassociation AJCD CG-PDAC-0083-C-PRIX- Component 3: 18 / personnel Entretien Strengthening institutional Request for Single Stage - One 2018-07- 2018-08- 2019-02- IDA / 61110 Post Limited 2,400.00 0.00 Canceled réseau informatique et capacity to support the Quotations Envelope 04 29 25 internet du PDAC development of commercial agriculture CG-PDAC-0084-C-PRIX- Component 3: 18 / Personnel entretien Strengthening institutional Request for Single Stage - One 2018-07- 2018-08- 2019-02- IDA / 61110 Post Limited 2,400.00 0.00 Canceled matériel informatique du capacity to support the Quotations Envelope 04 29 25 PDAC development of commercial agriculture Page 4 CG-PDAC-546-C-CI-20 / Component 3: Recrutement d'un agent Strengthening institutional d'entretien pour l'Antenne Request for Single Stage - One 2020-05- 2020-04- 2020-06- 2020-05- 2020-12- IDA / 61110 capacity to support the Post Limited 2,000.00 2,066.47 Signed Départementale de Quotations Envelope 03 17 28 18 25 development of commercial Planification et de Suivi du agriculture PDAC à Ngo (relance) CG-PDAC-609-SA-ED-20 / Renouvellement contrat pour l’entretien des locaux Component 3: de l’Unité Nationale de Strengthening institutional Coordination du Projet 2020-08- 2020-04- 2020-08- 2020-04- 2020-09- 2020-04- 2021-03- IDA / 61110 capacity to support the Post Direct Selection Direct 3,000.00 3,266.69 Signed d’Appui au Développement 03 24 08 27 12 30 11 development of commercial de l’Agriculture agriculture Commerciale (PDAC) par entente directe avec Monsieur BITOUALA Donatien CG-PDAC-610-SA-ED-20 / Renouvellement contrat pour la maintenance des Component 3: photocopieurs de l’Unité Strengthening institutional Nationale de Coordination 2020-08- 2020-04- 2020-08- 2020-04- 2020-09- 2020-04- 2021-03- IDA / 61110 capacity to support the Post Direct Selection Direct 1,200.00 1,295.81 Signed du Projet d’Appui au 03 24 08 27 12 30 11 development of commercial Développement de agriculture l’Agriculture Commerciale (PDAC) par entente directe avec Monsieur SENGA Jean CG-PDAC-611-SA-ED-20 / Renouvellement contrat, pour le gardiennage au Component 3: siège de l’Unité Nationale Strengthening institutional 2020-08- 2020-04- 2020-08- 2020-04- 2020-09- 2020-04- 2021-03- de Coordination du Projet IDA / 61110 capacity to support the Post Direct Selection Direct 9,300.00 10,042.55 Signed 03 24 08 27 12 30 11 d’Appui au Développement development of commercial de l’Agriculture agriculture Commerciale (PDAC) par entente directe avec la société PROSEC CG-PDAC-612-SA-ED-20 / Renouvellement contrat pour le ramassage des Component 3: ordures solides au siège de Strengthening institutional l’Unité Nationale de 2020-08- 2020-04- 2020-08- 2020-04- 2020-09- 2020-04- 2021-03- IDA / 61110 capacity to support the Post Direct Selection Direct 800.00 863.88 Signed Coordination du Projet 03 24 08 27 12 30 11 development of commercial d’Appui au Développement agriculture de l’Agriculture Commerciale (PDAC) par entente directe avec l'AJCD CG-PDAC-613-SA-ED-20 / Renouvellement contrat pour pour la maintenance du groupe électrogène de Component 3: l’Unité Nationale de Strengthening institutional 2020-08- 2020-04- 2020-08- 2020-04- 2020-09- 2020-04- 2021-03- Coordination du Projet IDA / 61110 capacity to support the Post Direct Selection Direct 1,200.00 1,306.68 Signed 03 24 08 27 12 30 11 d’Appui au Développement development of commercial de l’Agriculture agriculture Commerciale (PDAC) par entente directe avec monsieur POATY Henri Blaise CG_PDAC-682-A-DCF-21 Component 3: / Recrutement d'une société Strengthening institutional Pending Request for Single Stage - One 2021-07- 2021-08- 2022-02- de gardiennage pour l'Unité IDA / 61110 capacity to support the Post Limited 13,200.00 0.00 Implement Quotations Envelope 05 30 26 Nationale de Coordination development of commercial ation du PDAC agriculture CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual CG-PDAC-002-C-SMC-17 Component 1: Direct / Etude relative à la support to producer Least Cost Open - 2017-10- 2017-11- 2017-10- 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- 2018-04- IDA / V0400 Post 100,000.00 0.00 Canceled situation de référence dans groups and agribusiness Selection International 15 03 30 04 26 03 08 23 27 08 les zones du projet micro, small and medium enterprises (MSMEs) CG-PDAC-003-C-SMC-17 Component 1: Direct / Filières cibles-Etude de support to producer développement de filières Least Cost Open - 2017-10- 2018-06- 2017-10- 2017-11- 2017-12- 2017-12- 2018-01- 2018-02- 2018-03- IDA / V0400 groups and agribusiness Post 100,000.00 0.00 Canceled cibles ou schéma directeur Selection International 10 08 25 19 19 24 08 05 09 micro, small and medium évolutif vers la préparation enterprises (MSMEs) du nouveau projet CG-PDAC-011-C-SMC / Manuel-Elaboration du manuel des opérations du Projet (Manuels d'exécution, Component 3: des procédures Strengthening institutional Least Cost Open - 2017-08- 2017-07- 2017-08- 2017-09- 2017-08- 2017-10- 2017-10- 2017-10- 2017-10- 2017-11- 2017-10- 2017-12- 2018-03- administratives financière, IDA / V0400 capacity to support the Post 200,000.00 0.00 Canceled Selection International 01 31 16 06 28 16 09 26 13 12 26 17 17 comptable, de suivi development of commercial évaluation, de suivi agriculture environnemental et social de gestion à coups partagés, d'intervention urgente CG-PDAC-54019-CS-LCS / Component 1: Direct Etude relative à la situation support to producer Least Cost Open - Under 2018-02- 2017-11- 2018-03- 2018-03- 2018-02- 2018-04- 2018-05- 2018-04- 2018-05- 2018-05- 2018-06- 2018-06- 2018-09- IDA / 61110 Post 100,000.00 0.00 de référence dans les zones groups and agribusiness Selection International Implementation 28 03 05 23 27 22 14 25 16 05 15 09 07 du Projet micro, small and medium enterprises (MSMEs) CG-PDAC-0035-C-SMC- 18 / Recrutement d'un organisme indépendant Component 1: Direct chargé de d'analyser les support to producer Least Cost Open - Under 2018-06- 2018-04- 2018-07- 2018-08- 2018-06- 2018-09- 2018-09- 2018-09- 2018-11- 2019-10- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post 90,000.00 0.00 Selection International Implementation 28 04 19 05 13 14 17 27 01 27 de producteurs et des micro, small and medium micro, petites et moyennes enterprises (MSMEs) entreprises agroindustrielles candidats aux subventions du projet CG-PDAC-0038-C-SMC- Component 3: 18 / Recrutement d'un Strengthening institutional Least Cost Open - 2018-07- 2018-08- 2018-08- 2018-08- 2018-09- 2018-10- 2018-09- 2018-12- 2018-09- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2021-10- 2020-07- IDA / 61110 Post 90,000.00 28,221.54 Completed cabinet d'audit (Auditeur capacity to support the Selection International 31 03 15 10 05 02 08 04 15 21 02 16 28 04 12 24 Externe) development of commercial agriculture CG-PDAC-0358-C-SCBD- 19 / ONG-Recrutement dune ONG chargee de la Component 1: Direct selection et de la gestion support to producer Fixed Budget 2019-04- 2019-04- 2019-05- 2019-05- 2019-07- 2019-11- 2019-08- 2019-06- 2019-08- 2019-12- 2019-10- 2020-01- 2019-11- 2020-01- 2020-11- des prestataires de montage IDA / 61110 groups and agribusiness Post Open - National 221,000.00 288,140.29 Signed Selection 30 24 21 15 04 14 01 07 31 20 05 06 09 10 08 et de suivi encadrement des micro, small and medium plans d'affaires campaggne enterprises (MSMEs) 2020 dans les departements du Kouilou Pointe-Noire et Niari CG-PDAC-0359-C-SCBD- 19 / ONG-Recrutement dune ONG chargee de la Component 1: Direct selection et de la gestion support to producer Fixed Budget 2019-04- 2019-04- 2019-05- 2019-05- 2019-07- 2019-11- 2019-08- 2019-06- 2019-08- 2019-12- 2019-10- 2020-01- 2019-11- 2020-01- 2020-11- des prestataires de montage IDA / 61110 groups and agribusiness Post Open - National 221,000.00 203,186.83 Signed Selection 30 24 21 15 04 14 01 07 31 20 05 06 09 10 08 et de suivi encadrement des micro, small and medium plans d'affaires campaggne enterprises (MSMEs) 2020 dans les departements de la Bouenza et la Lekoumou CG-PDAC-0360-C-SCBD- 19 / ONG-Recrutement dune ONG chargee de la Component 1: Direct selection et de la gestion support to producer Fixed Budget 2019-04- 2019-04- 2019-05- 2019-05- 2019-07- 2019-11- 2019-08- 2019-06- 2019-08- 2019-12- 2019-10- 2020-01- 2019-11- 2020-01- 2020-11- des prestataires de montage IDA / 61110 groups and agribusiness Post Open - National 221,000.00 222,843.15 Signed Selection 30 24 21 15 04 04 01 07 31 20 05 06 09 10 08 et de suivi encadrement des micro, small and medium plans d'affaires campaggne enterprises (MSMEs) 2020 dans les departements du Pool et de Brazzaville CG-PDAC-0361-C-SCBD- 19 / ONG-Recrutement dune ONG chargee de la Component 1: Direct selection et de la gestion support to producer des prestataires de montage Fixed Budget 2019-04- 2019-04- 2019-05- 2019-05- 2019-07- 2019-11- 2019-08- 2019-06- 2019-08- 2019-12- 2019-10- 2020-01- 2019-11- 2020-01- 2020-11- IDA / 61110 groups and agribusiness Post Open - National 221,000.00 347,600.61 Signed et de suivi encadrement des Selection 30 24 21 15 04 14 01 07 31 20 05 06 09 10 08 micro, small and medium plans d'affaires campaggne enterprises (MSMEs) 2020 dans les departements des Plateaux Cuvette et Cuvette Ouest CG-PDAC-0362-C-SCBD- 19 / ONG-Recrutement dune ONG chargee de la Component 1: Direct selection et de la gestion support to producer Fixed Budget 2019-04- 2019-04- 2019-05- 2019-05- 2019-07- 2019-11- 2019-08- 2019-06- 2019-08- 2019-12- 2019-10- 2020-01- 2019-11- 2020-01- 2020-11- des prestataires de montage IDA / 61110 groups and agribusiness Post Open - National 221,000.00 199,542.90 Signed Selection 30 24 21 15 04 14 01 07 31 20 05 06 09 10 08 et de suivi encadrement des micro, small and medium plans d'affaires campaggne enterprises (MSMEs) 2020 dans les departements de la Sangha et de la Likouala CG-PDAC-0363-C-ED-19 Component 3: / Mise en oeuvre du Strengthening institutional UN Agencies Under 2019-04- 2019-06- 2019-05- 2020-09- 2019-07- 2019-12- Systeme Permanent Integre IDA / 61110 capacity to support the Prior Direct 2,000,000.00 3,451,877.00 (Direct) Implementation 18 14 28 11 02 29 des Statistiques agricole development of commercial SPISA-RGA avec la FAO agriculture CG-PDAC-0367-C-SQC-19 / Etude d'impact Component 2: Improving Consultant environnementale et sociale public infrastructure and 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2019-09- 2019-08- 2020-02- IDA / 61110 Post Qualification Limited 150,000.00 135,965.50 Signed pour la réhabilitation des the business climate for 14 06 28 26 28 31 01 01 28 Selection pistes et des ouvrages commercial agriculture franchissement à réhabiliter CG-PDAC-0365-C-SQC-19 / Etude-Etude dimpact Component 3: environnemental et social Strengthening institutional Consultant pour la rehabilitation et 2019-04- 2019-05- 2019-05- 2019-06- 2019-07- 2019-08- 2020-02- IDA / 61110 capacity to support the Post Qualification Open - National 60,000.00 0.00 Canceled lamenagement des sites de 18 28 09 22 22 26 22 development of commercial Selection lInstitut de Recheche agriculture Agronomique-IRA a Loudima et Oyo CG-PDAC-0112-C-SMC- Component 2: Improving 18 / Recrutement d'un public infrastructure and Least Cost Open - 2018-07- 2019-03- 2018-08- 2018-09- 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- IDA / 61110 Post 190,000.00 0.00 Canceled cabinet pour l'élaboration the business climate for Selection International 20 27 10 23 21 20 25 29 28 du code rural commercial agriculture CG-PDAC-005-C-SMC-17 Component 1: Direct / Vugarisation-Etude sur la support to producer Least Cost Open - 2017-10- 2019-03- 2017-10- 2017-11- 2017-12- 2017-12- 2018-01- 2018-02- 2018-04- vulgarisation agricole et les IDA / V0400 groups and agribusiness Post 100,000.00 0.00 Canceled Selection International 12 27 27 06 16 23 09 13 14 modalités d'appui aux micro, small and medium exploitants agricoles enterprises (MSMEs) CG-PDAC-0086-C-SMC- 18 / Recrutement d'un Component 2: Improving cabinet chargé d'appuyer le public infrastructure and Least Cost 2018-07- 2019-03- 2018-08- 2018-09- 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- MAEP dans l'élaboration des IDA / 61110 Post Open - National 100,000.00 0.00 Canceled the business climate for Selection 18 27 08 21 19 18 23 27 26 avants projets de textes commercial agriculture législatifs et réglementaires des secteurs agro pastoral et halieutique. CG-PDAC-0369-C-SBD-19 Component 1: Direct / Recrutement ONG pour le support to producer Fixed Budget 2019-05- 2019-04- 2019-06- 2019-05- 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-11- IDA / 61110 Post Open - National 8,500.00 0.00 Canceled suivi des plans daffaires des groups and agribusiness Selection 15 24 05 15 19 16 15 20 24 23 populations autochtones micro, small and medium enterprises (MSMEs) CG-PDAC-517-C-CAB-20 / Recrutement d'un cabinet Component 2: Improving pour etude technique des Consultant public infrastructure and 2020-03- 2020-03- 2020-04- 2020-05- 2020-05- 2020-06- 2020-06- 2020-06- 2020-12- 2020-07- pistes agricoles et voies IDA / 61110 Post Qualification Limited 180,000.00 367,599.86 Completed the business climate for 23 03 06 20 06 08 10 11 07 09 d’eau des départements de Selection commercial agriculture la Likouala, la Sangha, la Cuvette, la Cuvette-Ouest et les Plateaux CG-PDAC-520-C-CAB-20 / Recrutement d'un cabinet Component 2: Improving pour Etude technique des Consultant public infrastructure and 2020-03- 2020-03- 2020-04- 2020-05- 2020-05- 2020-06- 2020-06- 2020-06- 2020-12- 2020-07- pistes agricoles des IDA / 61110 Post Qualification Limited 120,000.00 292,518.66 Completed the business climate for 23 03 06 20 06 08 10 11 07 10 départements du Pool, la Selection commercial agriculture Bouenza, la Lekoumou, le Niari et le Kouilou CG-PDAC-532-C-SFQC-20 / Recrutement d'un cabinet Component 2: Improving pour la réalistion des études public infrastructure and Quality And Cost- Open - 2020-08- 2020-08- 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2022-02- IDA / 61110 Prior 500,000.00 0.00 Under Review techniques en vue de la the business climate for Based Selection International 03 24 07 04 04 08 12 12 construction des ponts sur commercial agriculture la Motaba et la Libenga CG-PDAC-642-CAB-SFQC- Component 3: 20 / Recrutement d'un Strengthening institutional Quality And Cost- Open - Under 2020-11- 2021-01- 2020-12- 2021-03- 2021-02- 2021-04- 2021-03- 2021-05- 2021-04- 2021-05- 2021-05- 2021-05- 2021-06- 2022-06- IDA / 61110 Post 80,000.00 39,641.65 cabinet d'audit externe du capacity to support the Based Selection International Implementation 30 28 21 24 03 23 03 18 02 18 07 26 11 11 PDAC exercices 2020, 2021 development of commercial et 2022 agriculture CG-PDAC-647-C-CAB-20 Component 1: Direct / Recrutement cabinet ou support to producer ONG pour Quality Based Under 2020-12- 2021-02- 2021-01- 2021-04- 2021-02- 2021-03- 2021-04- 2021-05- 2021-06- 2022-06- IDA / 61110 groups and agribusiness Post Open - National 50,000.00 0.00 operationalisation des Selection Implementation 15 23 05 10 18 18 17 17 21 21 micro, small and medium alliances productives des enterprises (MSMEs) beneficiaires des fonds à coûts patrtagés du PDAC CG-PDAC-652-C-CAB- Component 3: SFQC-20 / Recrutement Strengthening institutional Quality And Cost- Open - Under 2021-02- 2021-02- 2021-03- 2021-02- 2021-05- 2021-03- 2021-05- 2021-06- 2021-08- 2021-09- 2022-09- d'un cabinet chargé de la IDA / 61110 capacity to support the Post 150,000.00 0.00 Based Selection International Implementation 25 09 18 11 01 23 29 28 02 06 06 certification de l'audit development of commercial externe du PDAC exercices agriculture 2017, 2018 et 2019 INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated Contract / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract No. Approach Amount (US$) Status Contract Completion (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-PDAC-006-C-CI-17 / Financement-Etude relative Component 1: Direct à l'évaluation des options support to producer Individual Under 2017-10- 2018-02- 2017-11- 2018-04- 2017-11- 2018-04- 2017-11- 2018-01- de financement de IDA / V0400 groups and agribusiness Post Consultant Open 50,000.00 0.00 Implementation 15 12 06 03 13 04 30 04 l'agriculture commerciale et micro, small and medium Selection l'identification des Banques enterprises (MSMEs) et Etablissements de micro finance CG-PDAC-007-C-CI-17 / Component 2: Improving Individual Réhabilitation-Etude pour la public infrastructure and 2017-10- 2018-02- 2017-11- 2018-06- 2017-11- 2017-12- 2017-12- IDA / V0400 Post Consultant Open 10,000.00 0.00 Canceled réhabilitation du siège de the business climate for 16 07 09 06 16 03 24 Selection l'UNCP et des ADPS du commercial agriculture PDAC CG-PDAC-008-C-SCED / Component 2: Improving Pistes de desserte- public infrastructure and 2017-10- 2018-01- 2017-10- 2018-01- 2017-11- 2018-03- 2017-12- Identification et études sur IDA / V0400 Post Direct Selection Direct 40,000.00 2,782.79 Signed the business climate for 15 22 25 25 21 29 21 l'entretien des pistes de commercial agriculture desserte rurale CG-PDAC-0012-C-ED-17 Component 3: / Formulation du projet de Strengthening institutional 2017-10- 2017-10- 2017-10- 2017-10- 2017-10- 2017-11- 2017-11- IDA / 61110 Post Direct Selection Direct 30,000.00 24,846.94 Under Review relance de la recherche capacity to support the 08 10 16 31 10 28 02 agricole development of commercial agriculture CG-PDAC-51132-CS-CDS Component 3: / Recrutement d'un Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2017-12- 2018-04- consultant individuel pour IDA / 61110 capacity to support the Post Direct Selection Direct 30,000.00 24,356.88 Signed 21 14 26 14 04 12 05 l'élaboration du Manuel development of commercial d'exécution du Projet agriculture CG-PDAC-51147-CS-CDS / Collecte d'informations Component 3: complémentaires pour le Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-01- 2018-03- 2018-01- rapport ICRR du Projet de IDA / 61110 capacity to support the Post Direct Selection Direct 1,700.00 1,564.57 Completed 22 14 26 14 04 19 09 26 Développement Agricole et development of commercial de Réhabilitation des Pistes agriculture rurales (PDARP) CG-PDAC-51145-CS-CDS Component 3: / Stage pratique en Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-01- 2018-05- 2018-03- sauvegarde IDA / 61110 capacity to support the Post Direct Selection Direct 700.00 564.25 Completed 22 14 26 14 08 29 07 30 environnementale et sociale development of commercial au PDAC (Contrat agriculture n°037/PPF-PDAC-2018) CG-PDAC-51144-CS-CDS Component 3: / Stage pratique en Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-01- 2018-05- 2018-03- sauvegarde IDA / 61110 capacity to support the Post Direct Selection Direct 700.00 564.25 Completed 22 14 26 14 13 29 12 30 environnementale et sociale development of commercial au PDAC (Contrat n°38/PPF- agriculture PDAC-2018) CG-PDAC-51143-CS-CDS Component 3: / Stage pratique en Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-01- 2018-05- sauvegarde IDA / 61110 capacity to support the Post Direct Selection Direct 700.00 565.97 Signed 22 14 26 14 13 29 12 environnementale et sociale development of commercial au PDAC (Contrat n°39/PPF- agriculture PDAC-2018) Page 5 CG-PDAC-51142-CS-CDS Component 3: / Stage pratique en Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-01- 2018-05- 2018-03- sauvegarde IDA / 61110 capacity to support the Post Direct Selection Direct 700.00 565.97 Completed 22 14 26 14 13 29 12 30 environnementale et sociale development of commercial au PDAC (Contrat n°40/PPF- agriculture PDAC-2018) CG-PDAC-51139-CS-CDS Component 3: / Stage pratique en Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-01- 2018-05- 2018-03- sauvegarde IDA / 61110 capacity to support the Post Direct Selection Direct 700.00 565.97 Completed 22 14 26 14 13 29 12 30 environnementale et sociale development of commercial au PDAC (Contrat n°41/PPF- agriculture PDAC-2018) CG-PDAC-51137-CS-CDS Component 3: / Stage pratique en Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-01- 2018-05- 2018-03- sauvegarde IDA / 61110 capacity to support the Post Direct Selection Direct 700.00 563.59 Completed 22 14 26 14 13 29 12 30 environnementale et sociale development of commercial au PDAC (Contrat n°42/PPF- agriculture PDAC-2018) CG-PDAC-51135-CS-CDS Component 3: / Stage pratique en Strengthening institutional 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-01- 2018-05- 2018-03- sauvegarde IDA / 61110 capacity to support the Post Direct Selection Direct 700.00 565.97 Completed 22 14 26 14 13 29 12 30 environnementale et sociale development of commercial au PDAC (Contrat n° 43/PPF- agriculture PDAC-2018) CG-PDAC-0027-C-CI-18 / Component 3: Elaboration du Manuel de Strengthening institutional Individual 2018-02- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- 2018-03- 2018-04- 2018-05- 2020-11- procédures administratives, IDA / 61110 capacity to support the Post Consultant Open 30,000.00 24,552.52 Under Review 22 14 13 22 18 05 28 05 27 07 financières, comptables et development of commercial Selection de passation de marchés agriculture Component 3: CG-PDAC-0028-C-CI-18 / Individual Strengthening institutional 2018-02- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-05- 2018-05- Elaboration du Manuel de IDA / 61110 Post Consultant Open 30,000.00 27,309.57 Under Review capacity to support the 22 14 13 22 18 26 28 29 27 08 Suivi-Evaluation du PDAC Selection development of commercial agriculture CG-PDAC-0029-C-CI-18 / Component 3: Individual Elaboration du Manuel de Strengthening institutional 2018-02- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- 2018-03- 2018-04- 2018-05- 2016-11- IDA / 61110 Post Consultant Open 30,000.00 26,592.88 Completed Suivi-Environnemental et capacity to support the 22 14 13 22 18 03 28 05 12 07 Selection Social du PDAC development of commercial agriculture CG-PDAC-0030-C-CI-18 / Component 3: Individual Elaboration du Manuel de Strengthening institutional 2018-02- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-05- 2018-10- IDA / 61110 Post Consultant Open 30,000.00 15,991.03 Completed Gestion des Fonds à Coûts capacity to support the 22 14 13 22 18 26 28 26 07 11 Selection partagés du PDAC development of commercial agriculture CG-PDAC-0031-C-CI-18 / Component 3: Individual Elaboration du Manuel de la Strengthening institutional Under 2018-02- 2018-03- 2018-03- 2018-06- 2018-03- 2018-07- 2018-03- 2018-05- IDA / 61110 Post Consultant Open 30,000.00 0.00 Composante d'urgence du capacity to support the Implementation 22 14 13 06 18 04 28 02 Selection PDAC development of commercial agriculture CG-PDAC-0032-C-ED-18 Component 3: / Réalisation d'un Strengthening institutional 2018-02- 2018-03- 2018-03- 2018-04- 2018-03- 2018-03- 2018-04- IDA / 61110 Post Direct Selection Direct 20,000.00 14,843.55 Signed documentaire sur les succes capacity to support the 28 14 07 03 24 08 13 stories du PDARP development of commercial agriculture CG-PDAC-54314-CS-INDV Component 2: Improving Individual / Etudes pour la public infrastructure and 2018-03- 2018-03- 2018-04- 2018-06- 2018-04- 2018-06- 2018-04- 2018-05- 2018-05- 2018-07- IDA / 61110 Post Consultant Open 10,000.00 9,677.17 Completed réhabilitation du siège de the business climate for 15 15 07 06 12 15 22 31 13 14 Selection l'UNCP et des ADPS du commercial agriculture PDAC CG-PDAC-0043-C-CI-18 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 16,800.00 24,272.69 Completed Informaticien et logisticien capacity to support the 31 29 23 06 30 06 14 10 09 31 Selection pour le PDAC development of commercial agriculture CG-PDAC-0044-C-CI-18 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 16,800.00 24,294.86 Completed central de suivi- évaluation capacity to support the 31 29 23 06 30 06 14 10 09 31 Selection pour l'UNCP du PDAC development of commercial agriculture CG-PDAC-0045-C-CI-18 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 16,800.00 24,272.69 Completed Administratif pour l'UNCP capacity to support the 31 29 23 06 30 06 14 20 09 31 Selection du PDAC development of commercial agriculture CG-PDAC-0046-C-CI-18 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 12,000.00 19,877.62 Completed de suivi évaluation pour capacity to support the 31 29 23 06 30 10 14 10 09 31 Selection l'antenne PDAC de Pointe- development of commercial Noire agriculture CG-PDAC-0047-C-CI-18 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 12,000.00 19,984.64 Completed de suivi évaluation pour capacity to support the 31 29 23 06 30 10 14 10 09 31 Selection l'Antenne PDAC de Nkayi development of commercial agriculture CG-PDAC-0048-C-CI-18 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 12,000.00 19,984.64 Completed de suivi évaluation pour capacity to support the 31 29 23 06 30 06 14 10 09 31 Selection l'Antenne PDAC de Kinkala development of commercial agriculture CG-PDAC-0049-C-CI-18 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 12,000.00 19,984.64 Completed de suivi évaluation pour capacity to support the 31 29 23 06 30 06 14 10 09 31 Selection l'Antenne PDAC de NGO development of commercial agriculture CG-PDAC-0051-C-CI-18 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 12,000.00 18,504.30 Completed de suivi évaluation pour capacity to support the 31 29 23 06 30 10 14 10 09 31 Selection l'antenne PDAC de Ouesso development of commercial agriculture CG-PDAC-0052-C-CI-18 / Component 3: Individual Recrutement d'un Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 10,000.00 16,653.87 Completed comptable pour l'Antenne capacity to support the 31 29 23 06 30 20 14 10 09 31 Selection PDAC de Ouesso development of commercial agriculture CG-PDAC-0053-C-CI-18 / Component 3: Individual Recrutement d'une Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 9,000.00 14,356.06 Completed secrétaire pour l'Antenne capacity to support the 31 29 23 06 30 06 14 10 09 31 Selection PDAC de Ouesso development of commercial agriculture Component 3: CG-PDAC-0054-C-CI-18 / Individual Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2019-01- 2019-09- 2020-12- Recrutement d'un chauffeur IDA / 61110 Post Consultant Open 6,000.00 7,730.18 Completed capacity to support the 31 29 23 06 30 11 14 09 09 31 pour l'UCNP PDAC Selection development of commercial agriculture CG-PDAC-0055-C-CI-18 / Component 3: Individual Recrutement d'un Chauffeur Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2019-01- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 5,400.00 7,730.18 Completed pour l'Antenne PDAC de capacity to support the 31 29 23 06 30 09 14 10 09 31 Selection Nkayi development of commercial agriculture CG-PDAC-0056-C-CI-18 / Component 3: Individual Recrutement d'un Chauffeur Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 5,400.00 7,730.18 Completed pour l'Antenne PDAC de capacity to support the 31 29 23 06 30 11 14 10 09 31 Selection Ouesso development of commercial agriculture Component 3: CG-PDAC-0057-C-CI-18 / Individual Strengthening institutional Under 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2018-08- 2018-09- 2019-03- Recrutement d'un huissier IDA / 61110 Post Consultant Limited 3,600.00 0.00 capacity to support the Implementation 31 29 05 19 26 14 30 29 pour l'UNCP du PDAC Selection development of commercial agriculture CG-PDAC-0017-C-CI-17 / Component 3: Individual Recrutement d'un Assistant Strengthening institutional 2017-10- 2018-04- 2017-11- 2017-11- 2017-12- 2017-12- IDA / 61110 Post Consultant Open 4,200.00 0.00 Canceled en Suivi-Evaluation de capacity to support the 18 16 14 19 01 31 Selection l'UNCP du PDAC development of commercial agriculture Component 3: CG-PDAC-0050-C-CI-18 / Individual Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-08- 2018-12- 2018-09- 2019-01- 2019-09- 2020-12- Recrutement du Chef IDA / 61110 Post Consultant Open 30,000.00 33,307.74 Completed capacity to support the 31 29 23 06 30 06 14 10 09 31 d'Antenne PDAC de Ouesso Selection development of commercial agriculture CG-PDAC-0058-C-ED-18 Component 1: Direct / Elaboration du plan support to producer 2018-05- 2018-01- 2018-05- 2018-01- 2018-05- 2018-05- 2018-09- 2019-01- IDA / 61110 Post Direct Selection Direct 120,000.00 109,228.35 Completed national de développement groups and agribusiness 02 22 07 26 31 22 28 01 du cacao (PND-CACAO 2) micro, small and medium enterprises (MSMEs) CG-PDAC-0040-C-CI-18 / Component 3: Individual Recrutement d'un Strengthening institutional 2018-07- 2018-06- 2018-09- 2018-12- 2018-10- 2018-12- 2018-11- 2018-12- 2019-05- 2020-12- IDA / 61110 Post Consultant Open 36,000.00 53,292.38 Completed Responsable du capacity to support the 31 29 18 06 09 10 13 10 12 31 Selection renforcement des capacités development of commercial et des réformes du PDAC agriculture CG-PDAC-0041-C-CI-18 / Component 3: Individual Recrutement d'un Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-09- 2018-12- 2018-09- 2019-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 26,400.00 48,851.35 Completed Comptable principal du capacity to support the 31 29 25 06 01 12 13 31 08 31 Selection PDAC development of commercial agriculture CG-PDAC-0042-C-CI-18 / Component 3: Individual Recrutement d'un Ingénieur Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-09- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 24,000.00 31,087.22 Completed des travaux publics du capacity to support the 31 29 25 06 01 10 18 10 13 31 Selection PDAC development of commercial agriculture CG-PDAC-0039-C-CI-18 / Component 3: Individual Recrutement d'un Strengthening institutional 2018-07- 2018-06- 2018-08- 2018-12- 2018-09- 2018-12- 2018-09- 2018-12- 2019-09- 2020-12- IDA / 61110 Post Consultant Open 36,000.00 51,071.87 Completed Responsable de sauvegarde capacity to support the 31 29 25 06 01 11 18 10 13 31 Selection sociale du PDAC development of commercial agriculture CG-PDAC-0090-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien de la Selection commercial agriculture piste agricole Pilikondi- Bilala-Banga, dans le Département du Kouilou CG-PDAC-0091-C-CI-18 / Recrutement d'un consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- IDA / 61110 Post Consultant Limited 20,000.00 0.00 travaux d'entretien de la the business climate for Implementation 11 29 16 30 06 05 10 09 Selection piste agricole Les Saras- commercial agriculture Aviation-Bondika, dans le Département du Kouilou CG-PDAC-0092-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien de la Selection commercial agriculture piste agricole Malolo- Dihessé, dans le Département du Niari CG-PDAC-0093-C-CI-18 / Recrutement d'un consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- IDA / 61110 Post Consultant Limited 20,000.00 0.00 travaux d'entretien de la the business climate for Implementation 11 29 16 30 06 05 10 09 Selection piste agricole Bouansa- commercial agriculture Ngouédi-Kinzaba- Brettelles, dans le Département de la Bouenza. CG-PDAC-0094-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien de la Selection commercial agriculture piste agricole Kindzoumaba- Kibamba,dans le Département de la Bouenza. CG-PDAC-0095-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien de la Selection commercial agriculture piste agricole Odziba-dzion dzionMakemba, dans le Département du Pool CG-PDAC-0096-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien Himo de Selection commercial agriculture la piste Makemba-Ingolo, dans le Département du Pool. CG-PDAC-0097-C-CI-18 / Recrutement d'un consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- IDA / 61110 Post Consultant Limited 20,000.00 0.00 travaux d'entretien Himo de the business climate for Implementation 11 29 16 30 06 05 10 09 Selection la piste agricole Inga-Ingolo- commercial agriculture Mah-Imvouba, dans le Département du Pool. CG-PDAC-0098-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien de la Selection commercial agriculture piste Massa-Maty centre- Binokina, dans le Département du Pool. CG-PDAC-0099-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien de la Selection commercial agriculture piste agricole Boko- Ngondzo, dans le Département du Pool. CG-PDAC-0100-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien de la Selection commercial agriculture piste agricole Yonon-Ossa- Kialé, dans le Département des Plateaux. CG-PDAC-0101-C-CI-18 / Recrutement d'un consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- IDA / 61110 Post Consultant Limited 20,000.00 0.00 travaux d'entretien Himo de the business climate for Implementation 11 29 16 30 06 05 10 09 Selection la piste agricole Djambala- commercial agriculture Abalandolo, dans le Département des plateaux. CG-PDAC-0102-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 11 29 16 30 06 05 10 09 travaux d'entretien Himo de Selection commercial agriculture la piste Itomba-Eboyo2, dans le Département des Plateaux. CG-PDAC-0103-C-CI-18 / Recrutement d'un consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and Under 2018-07- 2018-06- 2018-07- 2018-08- 2018-08- 2018-11- 2018-09- 2019-03- IDA / 61110 Post Consultant Limited 20,000.00 0.00 travaux d'entretien de la the business climate for Implementation 11 29 16 30 06 05 10 09 Selection piste agricole Dzouama- commercial agriculture Doubandzo-Adingo, dans le Département de la Cuvette- Ouest. CG-PDAC-0105-C-CI-18 / Component 1: Direct Recrutement des support to producer Individual Under 2018-07- 2018-12- 2018-07- 2018-11- 2018-08- 2018-09- 2019-03- prestataires chargés de IDA / 61110 groups and agribusiness Post Consultant Limited 100,000.00 0.00 Implementation 11 21 16 26 06 10 09 l'évaluation de l'impact des micro, small and medium Selection alliances productives enterprises (MSMEs) CG-PDAC-0087-C-CI-18 / Component 1: Direct Recrutement d'un support to producer Individual consultant chargé d'assister 2018-06- 2018-08- 2018-09- 2018-10- 2019-10- IDA / 61110 groups and agribusiness Prior Consultant Open 200,000.00 0.00 Canceled le PDAC dans la mise en 28 16 06 11 11 micro, small and medium Selection œuvre des alliances enterprises (MSMEs) productives pour 12 mois CG-PDAC-0089-C-CI-18 / Recrutement d'un Component 2: Improving consultant pour le contrôle Individual public infrastructure and Under 2018-08- 2018-06- 2018-08- 2018-08- 2018-09- 2018-11- 2018-10- 2019-04- et la surveillance des IDA / 61110 Post Consultant Limited 20,000.00 0.00 the business climate for Implementation 15 29 20 30 10 05 15 13 travaux d'entretien de la Selection commercial agriculture piste agricole Mavitou-Lac cayo, dans le département du Kouilou CG-PDAC-0104-C-CI-18 / Component 1: Direct Individual Recrutement des support to producer 2018-07- 2019-02- 2018-07- 2018-08- 2018-09- 2019-03- IDA / 61110 Post Consultant Limited 150,000.00 0.00 Canceled prestataires chargés des groups and agribusiness 26 05 31 21 25 24 Selection alliances productives micro, small and medium enterprises (MSMEs) CG-PDAC-0113-C-ED-18 Component 3: / Recrutement d'un cabinet Strengthening institutional chargé de l'évaluation des 2018-09- 2018-09- 2018-09- 2018-08- 2018-10- 2018-09- 2018-10- 2018-09- IDA / 61110 capacity to support the Post Direct Selection Direct 10,000.00 8,221.20 Completed dossiers de manifestation 08 03 18 08 05 10 10 17 development of commercial d'intérêt du personnel agriculture complémentaire du PDAC Page 6 CG-PDAC-115-C-ED / Component 1: Direct Individual Recrutement d'un support to producer 2018-11- 2018-12- 2018-11- 2019-01- 2018-12- 2019-02- 2019-01- 2019-02- 2019-04- IDA / 61110 Post Consultant Direct 20,000.00 73,245.00 Signed consultant individuel pour groups and agribusiness 02 31 12 17 03 22 07 22 07 Selection les alliances productives micro, small and medium enterprises (MSMEs) CG-PDAC-116-C-CI / Component 2: Improving Individual Etude techniques d'accès à public infrastructure and 2018-11- 2019-01- 2018-12- 2019-02- 2019-01- 2019-03- 2019-02- 2019-03- 2019-05- 2019-05- IDA / 61110 Post Consultant Open 20,000.00 9,172.65 Completed l'eau, électricité et autres the business climate for 06 18 25 07 15 08 19 08 20 15 Selection infrastructures publiques commercial agriculture CG-PDAC-118-C-CI / Recrutement d'un Component 2: Improving Individual consultant pour la mise en public infrastructure and 2018-11- 2019-01- 2018-12- 2019-02- 2019-01- 2019-02- 2019-05- IDA / 61110 Post Consultant Open 40,000.00 0.00 Canceled place du cadre the business climate for 12 18 31 07 21 25 26 Selection réglementaire pour la commercial agriculture sécurité des aliments et standards de certification des produits CG-PDAC-119-C-CI / Component 2: Improving Individual Recrutement d'un public infrastructure and 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-02- 2019-03- 2019-05- 2019-05- IDA / 61110 Post Consultant Open 10,000.00 9,350.49 Completed consultant pour the business climate for 14 18 02 07 23 08 27 08 28 14 Selection l'élaboration du code rural commercial agriculture CG-PDAC-120-C-CI / Component 2: Improving Recrutement d'un Individual public infrastructure and 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-06- consultant pour la mise en IDA / 61110 Post Consultant Open 10,000.00 0.00 Canceled the business climate for 18 18 06 07 27 03 01 place des cadres de Selection commercial agriculture dialogue Publics Privé CG-PDAC-121-C-CI / Component 3: Recrutement d'un Strengthening institutional Individual consultant pour l'étude sur 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-02- 2019-03- 2019-05- 2019-04- IDA / 61110 capacity to support the Post Consultant Open 10,000.00 8,584.61 Completed la réhabilitation des 15 18 03 07 24 08 28 08 29 12 development of commercial Selection infrastructures de recherche agriculture développement CG-PDAC-122-C-CI / Component 3: Recrutement d'un Strengthening institutional Individual consultant pour les études Under 2018-11- 2019-01- 2019-01- 2019-03- 2019-01- 2019-03- 2019-02- 2019-05- IDA / 61110 capacity to support the Post Consultant Open 30,000.00 0.00 sur l'amélioration de la Implementation 14 18 02 07 23 08 27 28 development of commercial Selection filière semencière et l'accès agriculture aux géniteurs et alevins CG-PDAC-123-C-CI / Component 3: Recrutement d'un Strengthening institutional Individual 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- 2019-03- 2019-06- 2019-04- consultant pour les études IDA / 61110 capacity to support the Post Consultant Open 20,000.00 8,548.42 Completed 20 18 08 07 29 08 05 08 03 12 sur l'appui les services des development of commercial Selection statistiques agricoles agriculture CG-PDAC-124-C-CI / Component 3: Recrutement d'un Strengthening institutional Individual consultant pour les études 2018-11- 2019-02- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- 2019-03- 2019-06- 2019-04- IDA / 61110 capacity to support the Post Consultant Open 20,000.00 8,702.08 Completed sur l'appui au système de 22 12 10 07 31 08 07 08 05 12 development of commercial Selection formation supérieure et agriculture professionnelle agricole Component 3: Individual CG-PDAC-125-C-CI / Strengthening institutional Under 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- 2019-06- IDA / 61110 Post Consultant Open 20,000.00 0.00 Appui aux services du MAEP capacity to support the Implementation 22 18 10 07 31 12 07 05 Selection development of commercial agriculture CG-PDAC-126-C-CI-18 / Recrutement d'un Component 2: Improving Individual Consultant pour le contrôle public infrastructure and 2018-11- 2019-01- 2018-12- 2018-12- 2019-01- 2019-01- 2019-02- 2019-01- 2019-08- 2019-04- IDA / 61110 Post Consultant Open 6,000.00 4,300.40 Completed et la surveillance des the business climate for 12 04 31 04 21 09 25 09 24 10 Selection travaux de réhabilitation du commercial agriculture siège de l'UNCP du PDAC à Brazzaville CG-PDAC-0127-C-CI-18 / Recrutement d'un Consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and Under 2018-11- 2019-01- 2018-12- 2018-12- 2019-01- 2018-12- 2019-02- 2019-08- IDA / 61110 Post Consultant Open 6,000.00 0.00 travaux de réhabilitation du the business climate for Implementation 12 04 31 21 21 24 25 24 Selection siège de l'Antenne commercial agriculture Départementale de planification et de suivi du PDAC à Pointe-Noire CG-PDAC-0128-C-CI-18 / Recrutement d'un Consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and 2018-11- 2019-01- 2018-12- 2018-12- 2019-01- 2019-01- 2019-02- 2018-03- 2019-08- IDA / 61110 Post Consultant Open 6,000.00 1,204.11 Signed travaux de réhabilitation du the business climate for 12 04 31 21 21 09 25 09 24 Selection siège de l'Antenne commercial agriculture Départementale de Planification et de suivi du PDAC à Nkayi CG-PDAC-0129-C-CI-18 / Recrutement d'un Consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and 2018-11- 2019-01- 2018-12- 2018-12- 2019-01- 2019-01- 2019-02- 2019-01- 2019-08- 2019-04- IDA / 61110 Post Consultant Open 6,000.00 1,376.13 Completed travaux de réhabilitation du the business climate for 12 04 31 04 21 09 25 09 24 10 Selection siège de l'Antenne commercial agriculture Départementale de Planification et de Suivi du PDAC à Ngo CG-PDAC-0130-C-CI-18 / Recrutement d'un Consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and 2018-11- 2019-01- 2018-12- 2018-12- 2019-01- 2019-01- 2019-02- 2019-01- 2019-08- 2019-03- IDA / 61110 Post Consultant Open 6,000.00 1,379.78 Completed travaux de réhabilitation du the business climate for 12 04 31 04 21 09 25 09 24 30 Selection siège de l'Antenne commercial agriculture Départementale de Planification et de Suivi du PDAC à Kinkala CG-PDAC-0131-C-CI-18 / Recrutement d'un Consultant pour le contrôle Component 2: Improving Individual et la surveillance des public infrastructure and 2018-11- 2019-01- 2018-12- 2018-12- 2019-01- 2019-01- 2019-02- 2019-01- 2019-08- IDA / 61110 Post Consultant Open 6,000.00 2,580.24 Signed travaux de réhabilitation du the business climate for 12 04 31 04 21 09 25 09 24 Selection siège de l'Antenne commercial agriculture Départementale de Planification et de Suivi du PDAC àOuesso CG-PDAC-0133-C-CI-18 / Component 3: Recrutement d'un Strengthening institutional Individual consultant chargé de faire 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- 2019-03- 2019-09- 2019-05- IDA / 61110 capacity to support the Post Consultant Open 10,000.00 8,699.63 Completed l'étude pour la réhabilitation 22 04 10 07 31 08 07 08 03 06 development of commercial Selection des infrastructures de agriculture recherche développement CG-PDAC-0134-C-CI-18 / Recrutement d'un Component 3: consultant chargé de faire Strengthening institutional Individual un état des lieux et Under 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- 2019-09- IDA / 61110 capacity to support the Post Consultant Open 20,000.00 0.00 esquisser les modalités Implementation 22 04 10 07 31 08 07 03 development of commercial Selection d'octroi des bourses aux agriculture étudiants des écoles d'enseignement agricole CG-PDAC-0135-C-CI-18 / Recrutement d'un Component 2: Improving Individual consultant chargé de faire public infrastructure and 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- 2019-03- 2019-09- 2019-05- IDA / 61110 Post Consultant Open 40,000.00 10,073.80 Completed un état des lieux pour la the business climate for 22 04 10 07 31 12 07 12 03 09 Selection sécurité alimentaire et commercial agriculture standards de certification des produits CG-PDAC-0137-C-CI-18 / Component 2: Improving Recrutement d'un Individual public infrastructure and 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- 2019-03- 2019-09- 2019-04- consultant chargé de l'étude IDA / 61110 Post Consultant Open 10,000.00 9,255.23 Completed the business climate for 22 02 10 07 31 19 07 12 03 25 sur la mise en place du Selection commercial agriculture dialogue public privé dans le secteur agricole CG-PDAC-0036-C-CI-18 / Recrutement des Component 1: Direct prestataires chargés du support to producer Individual 2018-06- 2018-07- 2018-07- 2018-08- 2019-08- montage des plans IDA / 61110 groups and agribusiness Prior Consultant Open 200,000.00 0.00 Canceled 29 22 29 12 07 d'affaires des groupes de micro, small and medium Selection producteurs et des micro enterprises (MSMEs) petites et moyennes entreprises agroindustrielles CG-PDAC-0141-C-CI-18 / Prestataire chargé du montage des plans Component 1: Direct d'affaires des groupes de support to producer Individual 2018-12- 2018-08- 2019-01- 2018-10- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- producteurs et des micro IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.50 Completed 05 01 23 17 13 15 20 15 16 04 petites et moyennes micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Brazzaville 1 (secteurs agricoles de Madibou, Makélékélé et Mfilou) CG-PDAC-0142-C-CI-18 / Prestataire chargé du montage des plans Component 1: Direct d'affaires des groupes de support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- producteurs et des micro IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.50 Completed 05 01 23 14 13 15 20 15 16 04 petites et moyennes micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Brazzaville 2 (secteurs agricoles de Talangaï, Djiri et ïle Mbamou CG-PDAC-0143-C-CI-18 / Prestataire chargé du montage des plans Component 1: Direct d'affaires des groupes de support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- producteurs et des micro, IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.50 Completed 05 01 23 14 13 15 20 15 16 04 petites et moyennes micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Pointe-Noire (secteurs de Loandjili, Mvoumvou, Mongo Mpoukou et Lumumba) CG-PDAC-0144-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual d'affaires des groupes de 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.50 Completed producteurs et des micro, 05 01 23 14 13 15 20 15 16 04 micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Pointe-Noire 2 (secteurs de Tié-Tié, Ngoyo et Tchamba- Nzassi) CG-PDAC-0145-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,264.24 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Kinkala CG-PDAC-0146-C-CI-18 / Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.50 Completed d'affaires des groupes de 06 01 24 14 14 15 21 15 17 04 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Boko CG-PDAC-0147-C-CI-18 / Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.50 Completed d'affaires des groupes de 06 01 24 14 14 15 21 15 17 04 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Nkayi CG-PDAC-0148-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.50 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Madingou CG-PDAC-0149-C-CI-18 / Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.50 Completed d'affaires des groupes de 06 01 24 14 14 15 21 15 17 04 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Tsiaki CG-PDAC-0150-C-CI-18 / Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,264.24 Completed d'affaires des groupes de 06 01 24 14 14 15 21 15 17 04 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Sibiti CG-PDAC-0151-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,268.51 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mabombo CG-PDAC-0152-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,268.51 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Louvakou CG-PDAC-0153-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,268.51 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mvouti CG-PDAC-0154-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.45 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Loango CG-PDAC-0155-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,810.64 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Ignié et Ngabé CG-PDAC-0156-C-CI-18 / Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.45 Completed d'affaires des groupes de 06 01 24 14 14 15 21 15 17 04 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles d'Ewo CG-PDAC-0157-C-CI-18 / Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,270.33 Completed d'affaires des groupes de 06 01 24 14 14 15 21 15 17 04 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Ngo CG-PDAC-0158-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.45 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Djambala CG-PDAC-0159-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,806.06 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Ollombo et d'Abala CG-PDAC-0160-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.45 Completed 06 01 24 14 14 15 21 14 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Makoua CG-PDAC-0161-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.45 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Sembé Page 7 CG-PDAC-0162-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,810.64 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Pokola et Ouesso CG-PDAC-0163-C-CI-18 / Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.45 Completed 06 01 24 14 14 15 21 15 17 04 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Impfondo CG-PDAC-0164-C-CI-18 / Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.45 Completed d'affaires des groupes de 06 01 24 14 14 15 21 15 17 04 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles d'Epéna CG-PDAC-0165-C-CI-18 / Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2018-12- 2018-08- 2019-01- 2018-11- 2019-02- 2018-11- 2019-03- 2018-11- 2019-09- 2019-01- IDA / 61110 groups and agribusiness Post Consultant Open 7,000.00 1,267.45 Completed d'affaires des groupes de 06 01 24 14 14 15 21 15 17 04 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles d'Enyelle CG-PDAC-0037-C-CI-18 / Component 1: Direct Recrutement des support to producer Individual 2018-06- 2018-06- 2018-07- 2018-08- 2018-07- 2018-08- 2019-08- prestataires chargés du IDA / 61110 groups and agribusiness Post Consultant Open 400,000.00 0.00 Canceled 28 29 21 30 28 14 09 suivi de l'exécution des micro, small and medium Selection plans d'affaires enterprises (MSMEs) CG-PDAC-0166-C-CI-18 / Prestataire chargé du suivi/encadrement des Component 1: Direct plans d'affaires des groupes support to producer Individual de producteurs et des 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed micro, petites et moyennes 06 12 24 10 14 21 21 31 17 31 micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Brazzaville 1 (secteurs de Madibou, Makélékélé, Bacongo, Mfilou et Moungali) CG-PDAC-0169-C-CI-18 / Prestataire chargé du suivi/encadrement des Component 1: Direct plans d'affaires des groupes support to producer Individual de producteurs et des 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed micro, petites et moyennes 06 12 24 17 14 21 21 31 17 31 micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Pointe-Noire 1 (secteurs de Loandjili, Mongo-Mpoukou et Mvoumvou) CG-PDAC-0170-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed de producteurs et des 06 12 24 17 14 21 21 31 17 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Pointe-Noire 2 CG-PDAC-0171-C-CI-18 / Prestataire chargé du suivi/encadrement des Component 1: Direct plans d'affaires des groupes support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- de producteurs et des IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed 06 12 24 17 14 21 21 31 17 31 micro, petites et moyennes micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Pointe-Noire 3 (secteur de Tchiamba Nzassi) CG-PDAC-0173-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed 06 12 24 17 14 21 21 31 17 31 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Nkayi CG-PDAC-0174-C-CII-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed de producteurs et des 06 12 24 17 14 21 21 31 17 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Kinkala CG-PDAC-0175-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2019-03- 2019-09- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled 06 12 24 17 14 21 17 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Tsiaki CG-PDAC-0176-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed de producteurs et des 06 12 24 17 14 21 21 31 17 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Loango CG-PDAC-0177-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed de producteurs et des 06 12 24 17 14 21 21 31 17 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Mabombo CG-PDAC-0178-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed 06 12 24 17 14 21 21 31 17 31 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Sibiti CG-PDAC-0179-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed 06 12 24 17 14 21 21 31 17 31 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Boko CG-PDAC-0180-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed 06 12 24 17 14 21 21 31 17 31 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles d'Ignié CG-PDAC-0181-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,179.02 Completed 06 12 24 17 14 21 21 31 17 31 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Ngo CG-PDAC-0182-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,172.11 Completed de producteurs et des 06 12 24 17 14 21 21 31 17 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Ngabé CG-PDAC-0183-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2019-03- 2019-09- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled 06 12 24 17 14 21 17 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles d'Abala CG-PDAC-0184-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,149.43 Completed de producteurs et des 06 12 24 17 14 21 21 31 17 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Djambala CG-PDAC-0185-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,179.02 Completed de producteurs et des 06 12 24 17 14 21 21 31 17 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles d'Ollombo CG-PDAC-0186-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,203.21 Completed 07 12 25 17 15 21 22 31 18 31 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles d'Ewo CG-PDAC-0188-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-11- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 1,160.84 Signed de producteurs et des 07 12 25 17 15 21 22 15 18 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Pokola CG-PDAC-0189-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,179.02 Completed 07 12 25 17 15 21 22 31 18 31 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles d'Epéna CG-PDAC-0193-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2019-03- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled de producteurs et des 07 12 25 17 15 22 18 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Mossaka CG-PDAC-0194-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-12- 2019-02- 2019-01- 2019-03- 2019-05- 2019-09- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,172.11 Completed de producteurs et des 07 12 25 21 15 24 22 31 18 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Madingou CG-PDAC-0195-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-06- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 2,568.70 Signed de producteurs et des 07 12 25 17 15 21 22 10 18 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Makoua CG-PDAC-0196-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-05- 2019-09- 2019-12- plans d'affaires des groupes IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 4,149.43 Completed 07 12 25 17 15 21 22 31 18 31 de producteurs et des micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles d'Enyellé CG-PDAC-0197-C6CI-18 / Component 3: Individual Recrutement d'un Strengthening institutional 2018-12- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2018-12- 2019-10- 2020-12- IDA / 61110 Post Consultant Open 3,000.00 51,050.62 Completed Responsable des mesures capacity to support the 31 18 18 07 11 26 15 10 12 31 Selection de sauvegarde development of commercial environnementales du PDAC agriculture CG-PDAC-0199-CI-19 / Hinda-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,400.84 Completed 08 28 13 17 06 24 10 24 07 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Hinda CG-PDAC-0200-CI-19 / Madingo-Kayes-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-06- 2019-05- 2019-06- 2019-11- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,422.18 Completed de producteurs et des 20 28 25 17 15 24 20 24 16 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Madingou-Kayes CG-PDAC-0201-CI-19 / Kakamoeka-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-11- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,855.32 Completed de producteurs et des 20 28 25 17 15 28 20 24 16 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Kakamoéka CG-PDAC-0202-CI-19 / Nzambi-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-06- 2019-05- 2019-06- 2019-11- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,422.18 Completed 20 28 25 17 15 24 20 24 16 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Nzambi CG-PDAC-0203-CI-19 / Pointe-Noire 2-Prestataire chargé du montage des Component 1: Direct plans d'affaires des groupes support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- de producteurs et des IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,460.27 Completed 08 28 13 17 06 24 10 24 07 31 micro, petites et moyennes micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Pointe--Noire 2 (Tié tié, Ngoyo, Lumumba) CG-PDAC-0204-CI-19 / Tchiamba Nzassi- Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 4,028.07 Completed d'affaires des groupes de 08 28 13 17 06 24 10 24 07 31 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Pointe-Noire 3 (Tchiamba Nzassi) CG-PDAC-0205-CI-19 / Divénié-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 4,051.46 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Divénié CG-PDAC-0206-CI-19 / Kimongo-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual d'affaires des groupes de 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,429.44 Completed producteurs et des micro, 11 28 16 17 09 24 13 24 10 31 micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Kimongo Page 8 CG-PDAC-0207-CI-19 / Kibangou-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,993.47 Completed de producteurs et des 11 28 16 17 09 24 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Kibangou CG-PDAC-0208-CI-19 / Moutamba-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,380.54 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Moutamba CG-PDAC-0209-CI-19 / Mayoko-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,943.42 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mayoko CG-PDAC-0210-CI-19 / Makabana-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,460.85 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Makabana CG-PDAC-0211-CI-19 / Londéla-Kayes-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,388.82 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Londéla-Kayes CG-PDAC-0212-CI-19 / Banda-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,497.99 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Banda CG-PDAC-0213-CI-19 / Nyanga-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,406.83 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Nyanga CG-PDAC-0214-CI-19 / Mbinda-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,585.83 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mbinda CG-PDAC-0215-CI-19 / Moungoudou Sud- Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,417.59 Completed d'affaires des groupes de 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Moungoundou Sud CG-PDAC-0216-CI-19 / Moungoudou Nord- Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 4,052.64 Completed d'affaires des groupes de 11 28 16 17 09 24 13 24 10 31 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Moungoundou Nord CG-PDAC-0217-19 / Yaya- Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,430.52 Completed d'affaires des groupes de 11 28 16 17 09 28 13 25 10 31 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Yaya CG-PDAC-0218-CI-19 / Dolisie-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual Under 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-10- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 0.00 Implementation 11 28 16 17 09 28 13 10 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Dolisie CG-PDAC-0219-CI-19 / Mossendjo-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,451.22 Completed de producteurs et des 11 28 16 17 09 24 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Mossendjo CG-PDAC-0220-CI-19 / Komono-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,351.99 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Komono CG-PDAC-0221-CI-19 / Zanaga-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-06- 2019-05- 2019-06- 2019-11- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,974.98 Completed 20 28 25 17 15 24 20 24 16 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Zanaga CG-PDAC-0222-CI-19 / Bambama-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,837.47 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Bambama CG-PDAC-0223-CI-19 / Mayéyé-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,348.42 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mayéyé CG-PDAC-0224-CI-19 / Loudima-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual d'affaires des groupes de 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,454.03 Completed producteurs et des micro, 11 28 16 17 09 24 13 24 10 31 micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Loudima CG-PDAC-0225-CI-19 / Mouyondzi-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,344.85 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Mouyondzi CG-PDAC-0226-CI-19 / Boko-Songho-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,928.76 Completed de producteurs et des 11 28 16 17 09 24 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Boko-Songho CG-PDAC-0227-CI-19 / Kayes-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,919.52 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Kayes CG-PDAC-0228-CI-19 / Mfouati-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,319.86 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mfouati CG-PDAC-0229-CI-19 / Kingoué-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,344.42 Completed 11 28 16 17 09 28 13 25 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Kingoué CG-PDAC-0230-CI-19 / Yamba-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,337.28 Completed 11 28 16 17 09 28 13 25 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Yamba CG-PDAC-0231-CI-19 / Mbandza Ndounga- Component 1: Direct Prestataire chargé du support to producer Individual montage des plans 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,367.75 Completed d'affaires des groupes de 11 28 16 17 09 24 13 25 10 31 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles de Mbandza-Ndounga CG-PDAC-0232-CI-19 / Louingui-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual d'affaires des groupes de 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,428.14 Completed producteurs et des micro, 11 28 16 17 09 24 13 25 10 31 micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Louingui CG-PDAC-0233-CI-19 / Loumo-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,319.43 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Loumo CG-PDAC-0234-CI-19 / Mindouli-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual d'affaires des groupes de 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,375.01 Completed producteurs et des micro, 11 28 16 17 09 24 13 24 10 31 micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mindouli CG-PDAC-0235-CI-19 / Boko-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,354.24 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Boko CG-PDAC-0236-CI-19 / Kinkala-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,334.80 Completed 11 28 16 17 09 28 13 25 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Kinkala CG-PDAC-0237-CI-19 / Ignié-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,310.51 Completed 11 28 16 17 09 28 13 24 10 30 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Ignié CG-PDAC-0238-CI-19 / Ngabé-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,337.71 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Ngabé CG-PDAC-0239-CI-19 / Kindamba-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,352.81 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Kindamba CG-PDAC-0240-CI-19 / Vinza-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,319.86 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Vindza CG-PDAC-0241-CI-19 / Kimba-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,319.43 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Kimba CG-PDAC-0242-CI-19 / Mayama-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,342.01 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mayama CG-PDAC-0243-CI-19 / Goma Tsé-Tsé-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,308.72 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Goma Tsé-Tsé CG-PDAC-0244-CI-19 / Gamboma-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,307.55 Completed de producteurs et des 11 28 16 17 09 28 13 25 10 30 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Gamboma Page 9 CG-PDAC-0245-CI-19 / Lékan-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,487.40 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Lékana CG-PDAC-0246-CI-19 / Allébé-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,337.71 Completed 11 28 16 17 09 28 13 25 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Allébé CG-PDAC-0247-CI-19 / Makotipoko-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,364.39 Completed de producteurs et des 11 28 16 17 09 28 13 25 10 30 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Makotimpoko CG-PDAC-0248-CI-19 / Ollombo-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual d'affaires des groupes de 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,328.35 Completed producteurs et des micro, 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Ollombo CG-PDAC-0249-CI-19 / Abala-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,479.91 Completed 11 28 16 17 09 24 13 25 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Abala CG-PDAC-0250-CI-19 / Mbon-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,479.91 Completed 11 28 16 17 09 24 13 25 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mbon CG-PDAC-0251-CI-19 / Ongoni-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,936.10 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Ongoni CG-PDAC-0252-CI-19 / Mpouya-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,899.32 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mpouya CG-PDAC-0253-CI-19 / Boundji-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,337.28 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Boundji CG-PDAC-0254-CI-19 / Loukoléla-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,376.54 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Loukoléla CG-PDAC-0255-CI-19 / Mossaka-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual d'affaires des groupes de 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,403.75 Completed producteurs et des micro, 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mossaka CG-PDAC-0256-CI-19 / Component 1: Direct Oyo-Prestataire chargé du support to producer Individual montage des plans 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,354.61 Completed d'affaires des groupes de 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection producteurs et des micro, enterprises (MSMEs) petites et moyennes entreprises agricoles d'Oyo CG-PDAC-0257-CI-19 / Ngoko-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,367.22 Completed 11 28 16 17 09 28 13 25 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Ngoko CG-PDAC-0258-CI-19 / Ntokou-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,531.27 Completed 11 28 16 17 09 24 13 25 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Ntokou CG-PDAC-0259-CI-19 / Tchikapika-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,926.91 Completed de producteurs et des 11 28 16 17 09 24 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Tchikapika CG-PDAC-0260-CI-19 / Bokoma-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,890.18 Completed 11 28 16 17 09 28 13 24 10 30 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Bokoma CG-PDAC-0261-CI-19 / Okoyo-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,462.65 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Okoyo CG-PDAC-0262-CI-19 / Kellé-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,529.27 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Kellé CG-PDAC-0263-CI-19 / Mbomo-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,529.27 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mbomo CG-PDAC-0264-CI-19 / Mbama-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,545.20 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Mbama CG-PDAC-0265-CI-19 / Etoumbi-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,439.24 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles d'Etoumbi CG-PDAC-0266-CI-19 / Pokola-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,563.72 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Pokola CG-PDAC-0267-CI-19 / Souanké-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,653.29 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Souanké CG-PDAC-0268-CI-19 / Sembé-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,623.42 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Sembé CG-PDAC-0269-CI-19 / Pikounda-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual d'affaires des groupes de 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,569.28 Completed producteurs et des micro, 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Pikounda CG-PDAC-0270-CI-19 / Ngbala-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,601.30 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Ngbala CG-PDAC-0271-CI-19 / Kabo-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 4,118.10 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Kabo CG-PDAC-0272-CI-19 / Dongou-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,421.24 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Dongou CG-PDAC-0273-CI-19 / Liranga-Prestataire chargé Component 1: Direct du montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 4,230.39 Completed 11 28 16 17 09 24 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Liranga CG-PDAC-0274-CI-19 / Bétou-Prestataire chargé du Component 1: Direct montage des plans support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- d'affaires des groupes de IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,626.86 Completed 11 28 16 17 09 28 13 24 10 31 producteurs et des micro, micro, small and medium Selection petites et moyennes enterprises (MSMEs) entreprises agricoles de Bétou CG-PDAC-0275-CI-19 / Bouaniéla-Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,676.93 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Bouaniéla CG-PDAC-0276-CI-19 / Brazzaville 3- Prestataire chargé du montage des Component 1: Direct plans d'affaires des groupes support to producer Individual 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- de producteurs et des IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,302.01 Completed 11 28 16 17 09 28 13 24 10 31 micro, petites et moyennes micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Brazzaville 3 (Bacongo, Moungali, M'filou) CG-PDAC-0277-CI-19 / Île Mbamou- Prestataire Component 1: Direct chargé du montage des support to producer Individual plans d'affaires des groupes 2019-02- 2019-03- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- 2019-12- IDA / 61110 groups and agribusiness Post Consultant Limited 7,000.00 3,421.24 Completed de producteurs et des 11 28 16 17 09 28 13 24 10 31 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Brazzaville 4 (Île Mbamou) CG-PDAC-0348-CI-19 / Component 3: Individual Consultant chargé de Strengthening institutional 2019-03- 2019-04- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2020-01- IDA / 61110 Post Consultant Open 30,000.00 24,708.75 Signed l'élaboration du plan en capacity to support the 26 08 14 19 04 26 09 25 05 Selection faveur des populations development of commercial autochtones agriculture CG-PDAC-0347-C-CI-19 / Etude-Consultant pour Component 2: Improving Etude Technique de la piste Individual public infrastructure and 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-12- 2019-05- Ewo-Ngami-Bia-Kebili et de IDA / 61110 Post Consultant Limited 50,000.00 40,945.44 Completed the business climate for 15 30 20 18 11 02 15 06 12 27 louvrage sur la rivière Selection commercial agriculture Lébomi dans le Departement de la Cuvette- Ouest CG-PDAC-0348-C-CI-19 / Etude-Consultant pour Etude technique des pistes Component 2: Improving Individual Issabi-Aporo-Mouengué - public infrastructure and 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-12- IDA / 61110 Post Consultant Limited 40,000.00 41,102.64 Signed Ingouala et Ilebé et Pamba- the business climate for 15 18 20 18 11 02 15 06 12 Selection Odzaka-Odzema-Imania- commercial agriculture Okombé-Oko dans le Departement de la Cuvette CG-PDAC-0349-C-CI-19 / Etdude-Consultant pour Component 2: Improving Etude Technique des pistes Individual public infrastructure and 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-12- Ngo 2 - Adzi-Impé Itomba- IDA / 61110 Post Consultant Limited 30,000.00 30,826.98 Signed the business climate for 15 18 20 18 11 02 15 06 12 Eboyo 2 et Ngania-Ngouené- Selection commercial agriculture Okassa dans le Departement des Plateaux CG-PDAC-0350-C-CI-19 / Etude-Consultant pour Component 2: Improving Etude Technique des pistes Individual public infrastructure and Under 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-12- Boko-Mandombé-Bretelles IDA / 61110 Post Consultant Limited 40,000.00 41,102.64 the business climate for Implementation 15 18 20 18 11 02 15 12 Ingah-Ingolo-Mah-Imvouba Selection commercial agriculture et Maboria-Odziba dans le Departement du Pool CG-PDAC-0351-C-CI-19 / Etude-Consultant pour Component 2: Improving Individual Etude Techniques des pistes public infrastructure and Under 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-12- IDA / 61110 Post Consultant Limited 40,000.00 0.00 Kayes-Pont de la Louamba the business climate for Implementation 15 18 20 18 11 02 15 12 Selection et Tsiaki-Kimboto- commercial agriculture Mahouobo dans le Departement de la Bouenza CG-PDAC-0352-C-CI-19 / Etude-Consultant pour Component 2: Improving Individual Etude Technique des pistes public infrastructure and Under 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-12- IDA / 61110 Post Consultant Limited 40,000.00 0.00 Dibeni-Mpassi-Mpassi- the business climate for Implementation 15 18 20 18 11 02 15 12 Selection Maboko et Mpassi-Mpassi- commercial agriculture 6 manguiers dans le Departement du Niari Page 10 CG-PDAC-0353-C-CI-19 / Etude-Consultant pour Component 2: Improving Individual Etude Technique des public infrastructure and Under 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-12- IDA / 61110 Post Consultant Limited 50,000.00 0.00 pistesTchivala-Louvenza et the business climate for Implementation 15 18 20 18 11 02 15 12 Selection Pilikondi-Bilala-Banga dans commercial agriculture le Departement du Kouilou CG-PDAC-0354-C-ED-19 / Environnement-Etude d'impact environnemental Component 3: et social des plans d'affaires Strengthening institutional des groupements des 2019-04- 2019-04- 2019-04- 2019-04- 2019-06- 2019-05- 2019-12- IDA / 61110 capacity to support the Post Direct Selection Direct 200,000.00 121.87 Signed producteurs de micro 15 18 25 26 29 10 26 development of commercial petites et moyennes agriculture entreprises agroindustrielles avec le cabinet LOGIQUE DEVELOPPEMENT CONSULTANTS LODEC CG-PDAC-0364-C-CI-19 / Etude-Etude Technique Component 3: pour la rehabilitation et Strengthening institutional Individual 2019-04- 2019-06- 2019-04- 2020-01- 2019-05- 2020-02- 2019-06- 2020-02- 2019-12- lamenagement des sites de IDA / 61110 capacity to support the Post Consultant Limited 60,000.00 27,885.16 Signed 18 03 23 20 14 14 18 20 15 lInstitut de Recherche development of commercial Selection Agronomique-IRA a agriculture Loudime et Oyo CG-PDAC-0366-C-ED-19 / Renouvellement Contrat Bureau dEtudes et de Component 1: Direct Conseils en Gestion-BECG support to producer Organisme Independant 2019-04- 2019-05- 2019-04- 2019-07- 2019-12- IDA / 61110 groups and agribusiness Post Direct Selection Direct 134,000.00 0.00 Under Review charge de selectionner les 18 24 28 02 29 micro, small and medium plans daffaires des groupe enterprises (MSMEs) de producteurs et des micro petites et moyennes enreprises agro industrielles CG-PDAC-0374-C-ED-19 Component 3: / Préparation et Strengthening institutional organisation de la 2019-05- 2019-05- 2019-06- 2019-08- 2020-02- IDA / 61110 capacity to support the Post Direct Selection Direct 400,000.00 0.00 Under Review conférence d'Amsterdam 24 13 03 07 03 development of commercial sur le financement de agriculture l'agriculture avec le cabinet NAB CG-PDAC-0389-C-ED-19 / Appui a l evaluation et au renforcement des capacités Component 1: Direct de gestion des groupes de support to producer 2019-05- 2019-05- 2019-06- 2019-06- 2019-08- 2020-09- 2020-02- producteurs bénéficiaires IDA / 61110 groups and agribusiness Post Direct Selection Direct 200,000.00 73,373.66 Signed 24 07 03 13 07 23 03 de l appui du projet de micro, small and medium developpement de l enterprises (MSMEs) agriculture commerciale avec le cabinet SCOPE INSIGHT CG-PDAC-0356-C-ED-19 Component 3: / Expérimentation des Strengthening institutional 2019-04- 2019-05- 2019-07- 2020-01- IDA / 61110 Post Direct Selection Direct 24,000.00 0.00 Canceled biofertilisants avec le capacity to support the 21 01 05 01 Groupement LIAMBOU development of commercial Gisèle agriculture CG-PDAC-437-C-CI-19 / Consultant pour le contrôle Component 2: Improving Individual des travaux d'entretien en public infrastructure and 2019-07- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2020-03- 2020-01- IDA / 61110 Post Consultant Limited 7,000.00 8,434.25 Completed HIEQ de la piste Itomba- the business climate for 19 03 24 01 14 17 18 20 16 26 Selection Eboyo2 dans le commercial agriculture Département des Plateaux CG-PDAC-438-C-CI-19 / Consultant pour le contrôle Component 2: Improving Individual des travaux d'entretien en public infrastructure and 2019-07- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2020-03- 2020-01- IDA / 61110 Post Consultant Limited 6,000.00 6,747.40 Completed HIEQ de la piste Ngouéné- the business climate for 19 03 24 01 14 17 18 20 16 25 Selection Ngania-Okassa dans le commercial agriculture Département des Plateaux CG-PDAC-439-C-CI-19 / Component 2: Improving Consultant pour le contrôle Individual public infrastructure and 2019-07- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2020-03- 2020-01- des travaux en HIEQ de la IDA / 61110 Post Consultant Limited 4,000.00 5,229.24 Completed the business climate for 19 03 24 01 14 17 18 20 16 25 piste Ingah-Ingolo-Imvouba Selection commercial agriculture dans le Departement du Pool CG-PDAC-440-C-CI-19 / Consultant pour le contrôle Component 2: Improving Individual des travaux confortatifs de public infrastructure and 2019-07- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2020-03- 2020-03- IDA / 61110 Post Consultant Limited 17,000.00 25,302.75 Completed la piste Pilikondi-Bilala- the business climate for 19 03 24 01 14 17 18 20 16 25 Selection Banga dans le Departement commercial agriculture du Kouilou CG-PDAC-441-C-CI-19 / Consultant pour le contrôle Component 2: Improving Individual des travaux d'entretien en public infrastructure and 2019-07- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2020-03- 2020-01- IDA / 61110 Post Consultant Limited 3,000.00 5,238.69 Completed HIEQ de la piste Malolo- the business climate for 19 31 24 01 14 17 18 20 16 25 Selection Dihesse dans le commercial agriculture Departement du Niari CG-PDAC-442-CAB-ED-19 / Recrutement d une structure pour la formation Component 1: Direct des groupements et Micro support to producer 2019-09- 2019-11- 2019-09- 2019-11- 2019-11- 2020-01- 2020-05- Petites et Moyennes IDA / 61110 groups and agribusiness Post Direct Selection Direct 17,000.00 23,138.17 Signed 16 15 26 21 30 16 28 Entreprises financés en micro, small and medium 2018 sur la gestion des enterprises (MSMEs) pestes, par entente directe avec AGRI Congo CG-PDAC-443-ONG-ED- 19 / Recrutement d'une association pour la sensibilisation des Component 1: Direct groupements et Micro support to producer 2019-12- 2020-01- 2019-12- 2020-02- 2020-08- Petites et Moyennes IDA / 61110 groups and agribusiness Post Direct Selection Direct 17,000.00 0.00 Under Review 16 06 26 29 27 Entreprises financés en micro, small and medium 2018 sur le VIH SIDA et les enterprises (MSMEs) violences sexuelles et basées sur le genre en entente directe avec l'ONG CADASE CG-PDAC-447-C-ED-19 / Recrutement d un Component 3: consultant technique en Strengthening institutional charge des infrastructures 2019-09- 2020-01- 2019-10- 2020-01- 2019-12- 2020-02- 2020-06- IDA / 61110 capacity to support the Post Direct Selection Direct 50,000.00 28,004.90 Signed de recherche, des écoles, de 27 06 07 20 11 20 08 development of commercial l’ENSAF et les services agriculture techniques du MAEP par entente directe avec MR MBOUNGOU VICTOR CG-PDAC-450-CAB-ED-19 / Cabinet pour le contrôle et la surveillance des Component 2: Improving travaux de réhabilitation public infrastructure and 2019-10- 2020-01- 2019-10- 2020-01- 2019-12- 2020-02- 2020-06- IDA / 61110 Post Direct Selection Direct 65,000.00 72,994.69 Signed des pistes agricoles des the business climate for 15 06 25 06 29 20 26 Départements de la Cuvette commercial agriculture et Cuvette-Ouest avec le Cabinet Civil Engineering Services CG-PDAC-446-C-CI-19 / Consultant pour la mise en Component 3: place des plateformes de Strengthening institutional 2019-10- 2020-01- 2019-11- 2020-01- 2020-07- dialogue public prive IDA / 61110 capacity to support the Post Direct Selection Direct 50,000.00 0.00 Under Review 31 10 10 14 12 sectoriel à Brazzaville Pointe development of commercial Noire et Ouesso avec Mr agriculture Parisse AKOUANGO CG-PDAC-444-CAB-ED-19 / Recrutement d un cabinet pour l'élaboration d'une Component 2: Improving étude d'impact public infrastructure and 2019-09- 2020-01- 2019-09- 2020-01- 2019-12- 2020-02- 2020-06- 2020-12- IDA / 61110 Post Direct Selection Direct 150,000.00 342,288.69 Completed environnementale et sociale the business climate for 20 06 30 16 04 05 01 07 des infrastructures à commercial agriculture réhabiliter en 2020 par entente directe avec le cabinet CAERD CG-PDAC-445-CAB-ED-19 / Recrutement d un cabinet pour l'élaboration d'une Component 3: Notice d’impact Strengthening institutional environnementale et sociale 2019-09- 2020-01- 2019-09- 2020-01- 2019-12- 2020-02- 2020-06- 2021-01- IDA / 61110 capacity to support the Post Direct Selection Direct 25,000.00 214,269.46 Completed des infrastructures de 20 06 30 16 04 06 01 28 development of commercial recherche, écoles, institut et agriculture service déconcentrés du MAEP par entente directe avec LODEC CG-PDAC-451-CAB-ED-19 / Cabinet pour le contrôle Component 2: Improving et la surveillance des public infrastructure and 2019-10- 2020-01- 2019-10- 2020-01- 2019-12- 2020-02- 2020-06- travaux de réhabilitation IDA / 61110 Post Direct Selection Direct 35,000.00 49,562.70 Signed the business climate for 15 06 25 06 29 20 26 des pistes agricoles des commercial agriculture Départements du Pool et des Plateaux avec le Cabinet GECITRAP CG-PDAC-452-CAB-ED-19 / Cabinet pour le contrôle et la surveillance des Component 2: Improving travaux de réhabilitation public infrastructure and 2019-10- 2020-01- 2019-10- 2020-01- 2019-12- 2020-02- 2020-06- IDA / 61110 Post Direct Selection Direct 90,000.00 115,646.30 Signed des pistes agricoles des the business climate for 15 06 25 06 29 20 26 Départements du Kouilou, commercial agriculture Niari et Bouenza avec le Groupement MANZI Sarl- STGC GC-PDAC-463-C-CI-19 / Component 3: Recrutement d’un gardien Strengthening institutional Individual pour l’Antenne 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 2,117.80 Signed Départementale de 09 06 27 11 17 26 23 28 19 development of commercial Selection Planification et de Suivi du agriculture PDAC à Ouesso CG-PDAC-464-C-CI-19 / Component 3: Recrutement d’un gardien Strengthening institutional Individual pour l’Antenne 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 2,117.80 Signed Départementale de 09 06 27 11 17 26 23 28 19 development of commercial Selection Planification et de Suivi du agriculture PDAC à Ngo CG-PDAC-465-C-CI-19 / Component 3: Recrutement d’un gardien Strengthening institutional Individual pour l’Antenne 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 2,118.48 Signed Départementale de 09 06 27 13 17 26 23 28 19 development of commercial Selection Planification et de Suivi du agriculture PDAC à Kinkala CG-PDAC-466-C-CI-19 / Component 3: Recrutement d’un gardien Strengthening institutional Individual pour l’Antenne 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 2,118.48 Signed Départementale de 09 06 27 11 17 26 23 28 19 development of commercial Selection Planification et de Suivi du agriculture PDAC à Nkayi CG-PDAC-467-C-CI-19 / Component 3: Recrutement d’un gardien Strengthening institutional Individual pour l’Antenne 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 2,118.48 Signed Départementale de 09 06 27 11 17 26 23 28 19 development of commercial Selection Planification et de Suivi du agriculture PDAC à Pointe-Noire CG-PDAC-468-C-CI-19 / Component 3: Individual Recrutement d’un agent Strengthening institutional 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-09- IDA / 61110 Post Consultant Open 3,600.00 2,195.75 Signed d'entretien des nouveaux capacity to support the 09 06 27 18 17 19 23 19 19 Selection bureaux de l UNCP PDAC development of commercial agriculture CG-PDAC-469-C-CI-19 / Component 3: Recrutement d’un agent Strengthening institutional Individual d’entretien des bureaux de 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 1,699.50 Signed l’Antenne Départementale 09 06 27 11 17 26 23 28 19 development of commercial Selection de Planification et de Suivi agriculture du PDAC à Pointe-Noire CG-PDAC-470-C-CI-19 / Component 3: Recrutement d’un agent Strengthening institutional Individual d’entretien des bureaux de 2019-12- 2020-01- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 0.00 Under Review l’Antenne Départementale 09 06 27 17 23 19 development of commercial Selection de Planification et de Suivi agriculture du PDAC à Nkayi CG-PDAC-471-C-CI-19 / Component 3: Recrutement d’un agent Strengthening institutional Individual d’entretien des bureaux de 2019-12- 2020-01- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 0.00 Under Review l’Antenne Départementale 09 06 27 17 23 19 development of commercial Selection de Planification et de Suivi agriculture du PDAC à Kinkala CG-PDAC-476-C-CI-19 / Component 3: Recrutement d’un agent Strengthening institutional Individual d’entretien des bureaux de 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 1,694.24 Signed l’Antenne Départementale 09 06 27 11 17 26 23 28 19 development of commercial Selection de Planification et de Suivi agriculture du PDAC à Ouesso CG-PDAC-513-C-CA-2019 / Recrutement du Cabinet Weijs Film Film pour la Component 3: production d'une vidéo de Strengthening institutional Individual 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-08- promotion de l'agriculture IDA / 61110 capacity to support the Post Consultant Direct 23,164.00 22,817.15 Signed 12 27 22 27 12 28 16 28 14 congolaise à l'occasion du development of commercial Selection Forum à Amsterdam aux agriculture Pays Bas, sur la recherche des financements de l'agriculture congolaise. CG-PDAC-522-C-CI-20 / Component 3: Recrutement d’un Strengthening institutional Individual consultant pour la Mise en 2020-02- 2020-03- 2020-04- 2020-06- 2020-04- 2020-08- 2020-06- 2020-08- 2020-12- IDA / 61110 capacity to support the Post Consultant Open 40,000.00 58,947.32 Signed harmonie à l'Acte uniforme 20 16 09 22 30 21 04 24 01 development of commercial Selection de l'OHADA sur le droit les agriculture sociétés coopératives CG-PDAC-523-C-ED-20 / Recrutement de Mme Component 3: Coulibaly Hélène Strengthening institutional 2020-02- 2020-03- 2020-03- 2020-03- 2020-05- 2020-08- 2020-11- Consultante pour la mise IDA / 61110 capacity to support the Post Direct Selection Direct 120,000.00 63,813.83 Signed 20 16 01 27 05 19 01 en place du cadre development of commercial réglementaire de la agriculture sécurité des aliments et standards de certification CG-PDAC-528-C-ED-20 / Recrutement d'un cabinet pour l'étude de faisabilité de : Component 3: - système adapté de Strengthening institutional crédit agricole au Congo 2020-02- 2020-04- 2020-03- 2020-04- 2020-05- 2020-08- 2020-11- IDA / 61110 capacity to support the Post Direct Selection Direct 150,000.00 134,384.38 Signed - mise en place d'un 28 20 09 20 13 12 09 development of commercial Qualipôle agriculture - assurance agricole au Congo avec la société d'Etudes et de Promotion du Développement (SEP Développement) CG-PDAC-529-C-ED-20 / Component 3: Réalisation de l’évaluation à Strengthening institutional 2020-02- 2020-03- 2020-03- 2020-03- 2020-05- 2020-06- 2020-11- 2020-08- IDA / 61110 Post Direct Selection Direct 48,000.00 57,261.21 Completed mi-parcours du PDAC avec capacity to support the 28 13 09 31 13 15 09 05 MR Issa DRAME development of commercial agriculture CG-PDAC-530-C-ED-20 / Component 3: Recrutement d’un Strengthening institutional 2020-02- 2020-03- 2020-03- 2020-03- 2020-05- 2020-03- 2020-11- infographiste par entente IDA / 61110 capacity to support the Post Direct Selection Direct 2,000.00 690.42 Signed 28 13 09 16 13 19 09 directe avec MR OKASSOU development of commercial Stanislas agriculture CG-PDAC-477-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de 09 27 17 23 19 development of commercial Selection l’agriculture dans la agriculture Likouala 1 CG-PDAC-478-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans la Likouala 2 agriculture CG-PDAC-479-C-CI-19 / Component 3: - Recrutement d’un Strengthening institutional Individual chauffeur pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans la agriculture Likouala 3 CG-PDAC-480-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de development of commercial Selection l’agriculture dans la Sangha agriculture 1 Page 11 CG-PDAC-481-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans la sangha 2 agriculture CG-PDAC-482-C-CI-19 / Component 3: - Recrutement d’un Strengthening institutional Individual chauffeur pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans la agriculture sangha 3 CG-PDAC-483-C-CI-19 / Component 3: - Recrutement d’un Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- chauffeur pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de development of commercial Selection l’agriculture dans la Cuvette agriculture 1 CG-PDAC-485-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans la agriculture Cuvette 3 CG-PDAC-486-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de 09 27 17 23 19 development of commercial Selection l’agriculture dans la Cuvette- agriculture Ouest 1 CG-PDAC-487-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de l’élevage 09 27 17 23 19 development of commercial Selection dans la Cuvette- agriculture Ouest 2 CG-PDAC-484-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans la Cuvette 2 agriculture CG-PDAC-488-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans la agriculture Cuvette-Ouest 3 CG-PDAC-489-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de 09 27 17 23 19 development of commercial Selection l’agriculture dans les agriculture Plateaux 1 CG-PDAC-490-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans les Plateaux 2 agriculture CG-PDAC-491-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans les agriculture Plateaux 3 CG-PDAC-492-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de development of commercial Selection l’agriculture dans le Pool1 agriculture CG-PDAC-493-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans le Pool 2 agriculture CG-PDAC-494-C-CI-19 / Component 3: - Recrutement d’un Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- chauffeur pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de la pêche development of commercial Selection et de l’aquaculture dans le agriculture Pool 3 CG-PDAC-500-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans la agriculture Bouenza 3 CG-PDAC-495-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de development of commercial Selection l’agriculture à Brazzaville 1 agriculture CG-PDAC-502-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans le Niari 2 agriculture CG-PDAC-503-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans le agriculture Niari 3 CG-PDAC-496-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection à Brazzaville 2 agriculture CG-PDAC-498-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de development of commercial Selection l’agriculture dans la agriculture Bouenza 1 CG-PDAC-505-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans la Lékoumou 2 agriculture CG-PDAC-501-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de development of commercial Selection l’agriculture dans le Niari 1 agriculture CG-PDAC-504-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de 09 27 17 23 19 development of commercial Selection l’agriculture dans la agriculture Lékoumou 1 CG-PDAC-497-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture à agriculture Brazzaville 3 CG-PDAC-499-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans la Bouenza 2 agriculture CG-PDAC-506-C-CI-19 / Component 3: - Recrutement d’un Strengthening institutional Individual chauffeur pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans la agriculture Lékoumou 3 CG-PDAC-507-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de development of commercial Selection l’agriculture à Pointe-Noire agriculture 1 CG-PDAC-508-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection à Pointe-Noire 2 agriculture CG-PDAC-509-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture à Pointe- agriculture Noire 3 CG-PDAC-510-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de development of commercial Selection l’agriculture dans le Kouilou agriculture 1 CG-PDAC-511-C-CI-19 / Component 3: Recrutement d’un chauffeur Strengthening institutional Individual 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- pour la direction IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled 09 27 17 23 19 départementale de l’élevage development of commercial Selection dans le Kouilou 2 agriculture CG-PDAC-512-C-CI-19 / Component 3: - Recrutement d’un Strengthening institutional Individual chauffeur pour la direction 2019-12- 2020-01- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 0.00 Canceled départementale de la pêche 09 27 17 23 19 development of commercial Selection et de l’aquaculture dans le agriculture Kouilou 3 CG-PDAC-0373-C-CI-19 / Component 1: Direct Recrutement prestataire support to producer Individual chargé du suivi- 2019-05- 2019-05- 2019-07- 2019-08- 2019-09- 2020-03- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled encadrement des plans 24 27 12 02 06 04 micro, small and medium Selection daffaires dans le District de enterprises (MSMEs) Louingui Département du Pool CG-PDAC-0372-C-CI-19 / Component 1: Direct Recrutement prestataire support to producer Individual chargé du suivi- 2019-05- 2019-05- 2019-07- 2019-08- 2019-09- 2020-03- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled encadrement des plans 24 27 12 02 06 04 micro, small and medium Selection daffaires dans le District de enterprises (MSMEs) Loumo Département du Pool CG-PDAC-0370-C-CI-19 / Component 1: Direct Recrutement prestataire support to producer Individual chargé du suivi- 2019-05- 2019-05- 2019-07- 2019-08- 2019-09- 2020-03- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled encadrement des plans 24 27 12 02 06 04 micro, small and medium Selection d'affaires dans le District de enterprises (MSMEs) Mindouli Département du Pool CG-PDAC-0371-C-CI-19 / Component 1: Direct Recrutement prestataire support to producer Individual chargé du suivi- 2019-05- 2019-05- 2019-07- 2019-08- 2019-09- 2020-03- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled encadrement des plans 24 27 12 02 06 04 micro, small and medium Selection daffaires dans le District de enterprises (MSMEs) Goma-Tsé-Tsé Départament du Pool CG-PDAC-004-C-CI-17 / Component 1: Direct Etude d'appui à l'élaboration support to producer Individual 2017-10- 2019-03- 2017-11- 2017-11- 2017-12- 2018-02- de la politique semencière IDA / V0400 groups and agribusiness Post Consultant Open 50,000.00 0.00 Canceled 11 27 04 11 05 03 (sur base de l'assistance micro, small and medium Selection technique FAO enterprises (MSMEs) CG-PDAC-0132-C-CI-18 / Recrutement d'un Component 2: Improving Individual consultant chargé de la public infrastructure and 2018-11- 2019-03- 2019-01- 2019-01- 2019-03- 2019-09- IDA / 61110 Post Consultant Open 10,000.00 0.00 Canceled mise en conformité de l'acte the business climate for 20 26 08 29 05 01 Selection uniforme relatif au droit des commercial agriculture sociétés coopératives CG-PDAC-0192-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled de producteurs et des 07 12 25 17 15 21 22 18 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles d'Impfondo CG-PDAC-0191-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled de producteurs et des 07 12 25 17 15 21 22 18 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Ouesso CG-PDAC-0190-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled de producteurs et des 07 12 25 17 15 21 22 18 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Sembé CG-PDAC-0187-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled de producteurs et des 07 12 25 17 15 21 22 18 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles d'Owando CG-PDAC-0172-C-CI-18 / Prestataire chargé du Component 1: Direct suivi/encadrement des support to producer Individual plans d'affaires des groupes 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled de producteurs et des 06 12 24 17 14 21 21 17 micro, small and medium Selection micro, petites et moyennes enterprises (MSMEs) entreprises agricoles de Mvouti CG-PDAC-0168-C-CI-18 / Prestataire chargé du suivi/encadrement des Component 1: Direct plans d'affaires des groupes support to producer Individual 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-09- de producteurs et des IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled 06 12 24 17 14 21 21 17 micro, petites et moyennes micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Brazzaville 3 (secteurs de l'Île Mbamou) CG-PDAC-0167-C-CI-18 / Prestataire chargé du suivi/encadrement des Component 1: Direct plans d'affaires des groupes support to producer Individual de producteurs et des 2018-12- 2018-07- 2019-01- 2018-10- 2019-02- 2018-12- 2019-03- 2019-09- IDA / 61110 groups and agribusiness Post Consultant Open 10,000.00 0.00 Canceled micro, petites et moyennes 06 12 24 17 14 21 21 17 micro, small and medium Selection entreprises agricoles de enterprises (MSMEs) Brazzaville 2 (secteurs de Talangaï, Ouenzé, Poto- Poto et Djiri) CG-PDAC-516-C-CI-20 / Component 1: Direct Renouvellement du contrat support to producer 2020-02- 2020-03- 2020-05- 2020-11- IDA / 61110 Post Direct Selection Direct 240,000.00 0.00 Canceled de l’organisme indépendant groups and agribusiness 20 01 05 01 de sélection des plans micro, small and medium d’affaires enterprises (MSMEs) Page 12 CG-PDAC-556-C-ED-20 / Component 3: Recrutement du Strengthening institutional 2020-12- 2020-01- 2021-01- 2021-03- 2021-09- Coordonnateur National du IDA / 61110 capacity to support the Post Direct Selection Direct 96,000.00 0.00 Under Review 31 01 10 16 12 PDAC development of commercial Régularisation agriculture CG-PDAC-557-C-ED-20 / Component 3: Recrutement du Strengthening institutional 2020-12- 2020-01- 2021-01- 2021-03- 2021-09- Responsable Administratif IDA / 61110 capacity to support the Post Direct Selection Direct 68,000.00 0.00 Under Review 31 01 10 16 12 et Financier du PDAC development of commercial Régularisation agriculture CG-PDAC-558-C-ED-20 / Component 3: Recrutement du Strengthening institutional 2020-12- 2020-01- 2021-01- 2021-03- 2021-09- Responsable de la Passation IDA / 61110 capacity to support the Post Direct Selection Direct 60,000.00 0.00 Under Review 31 01 10 16 12 des Marchés du PDAC development of commercial Régularisation agriculture CG-PDAC-559-C-ED-20 / Component 3: Recrutement du Strengthening institutional 2020-12- 2020-01- 2021-01- 2021-03- 2021-09- IDA / 61110 Post Direct Selection Direct 60,000.00 0.00 Under Review Responsable du suivi capacity to support the 31 01 10 16 12 évaluation du PDAC development of commercial Régularisation agriculture CG-PDAC-561-C-ED-20 / Component 3: Recrutement du Strengthening institutional 2020-12- 2020-01- 2021-01- 2021-03- 2021-09- Responsable de la IDA / 61110 capacity to support the Post Direct Selection Direct 60,000.00 0.00 Under Review 31 01 10 16 12 composante 2: development of commercial Infrastructures du PDAC agriculture Régularisation CG-PDAC-604-C-ED-20 / Etudes environnementales Component 2: Improving et sociales des travaux de public infrastructure and 2020-08- 2020-07- 2020-08- 2020-10- 2021-04- construction de la ligne IDA / 61110 Post Direct Selection Direct 34,000.00 0.00 Under Review the business climate for 03 24 13 17 15 électrique de l’agropole de commercial agriculture Dihessé par entente directe avec le cabinet CAERD CG-PDAC-605-C-ED-20 / Etudes environnementales Component 2: Improving et sociales des travaux de public infrastructure and 2020-08- 2020-10- 2020-08- 2020-10- 2020-10- 2020-11- 2021-04- construction de la ligne IDA / 61110 Post Direct Selection Direct 34,000.00 165,913.86 Signed the business climate for 03 21 13 28 17 11 15 électrique pour le CAT Inoni commercial agriculture par entente directe avec le Cabinet CAERD CG-PDAC-607-C-CI-20 / Component 3: Recrutement d'un chauffeur Strengthening institutional Individual pour la Direction 2020-08- 2020-07- 2020-09- 2020-08- 2020-10- 2020-10- 2020-11- 2020-10- 2021-05- 2020-12- IDA / 61110 capacity to support the Post Consultant Open 4,800.00 799.35 Completed Départementale de l'Elevage 03 28 21 20 12 08 16 08 15 23 development of commercial Selection dans le Département de la agriculture Cuvette Ouest CG-PDAC-608-C-CI-20 / Recrutement d'un chauffeur Component 3: pour la Direction Strengthening institutional Individual 2020-08- 2020-07- 2020-09- 2020-10- 2020-10- 2020-10- 2020-11- 2020-10- 2021-05- 2021-03- Départementale de IDA / 61110 capacity to support the Post Consultant Open 4,800.00 540.20 Completed 03 28 21 08 12 19 16 19 15 12 l'Agriculture dans le development of commercial Selection Département de la Cuvette agriculture Ouest CG-PDAC-472-C-CI-19 / Component 3: Recrutement d’un agent Strengthening institutional Individual d’entretien des bureaux de 2019-12- 2020-01- 2020-01- 2020-04- 2020-02- 2020-03- 2020-09- IDA / 61110 capacity to support the Post Consultant Open 3,600.00 0.00 Canceled l’Antenne Départementale 09 06 27 29 17 23 19 development of commercial Selection de Planification et de Suivi agriculture du PDAC à Ngo CG-PDAC-117-C-CI / Component 2: Improving Recrutement d'un Individual public infrastructure and 2018-11- 2019-03- 2018-12- 2019-01- 2019-02- 2019-05- consultant pour la mise en IDA / 61110 Post Consultant Open 10,000.00 0.00 Canceled the business climate for 08 26 27 17 21 22 en conformité de l'acte Selection commercial agriculture uniforme sur les sociétés coopératives CG-PDAC-637-C-CA-ED- 20 / Renouvellement du contrat de contrôle et de surveillance des mesures Component 2: Improving environnementales et public infrastructure and 2020-10- 2020-09- 2020-11- 2021-01- 2021-07- sociales des travaux de IDA / 61110 Post Direct Selection Direct 140,000.00 0.00 Under Review the business climate for 30 02 09 13 12 réhabilitation des pistes et commercial agriculture de construction des bâtiments dans les Départements du Niari du Kouilou et de la Bouenza avec le cabinet STGC CG-PDAC-638-C-CAB-ED- 20 / Renouvellement du contrat de contrôle et de surveillance des mesures Component 2: Improving environnementales et public infrastructure and 2020-10- 2020-09- 2020-11- 2021-01- 2021-07- sociales des travaux de IDA / 61110 Post Direct Selection Direct 60,000.00 0.00 Under Review the business climate for 30 02 09 13 12 réhabilitation des pistes et commercial agriculture de construction des bâtiments dans les Départements du Pool et des Plateaux avec le cabinet GECITRAP CG-PDAC-633-T-ED-20 / Renouvellement du contrat de contrôle et de Component 2: Improving surveillance public infrastructure and 2020-11- 2020-11- 2021-01- 2021-07- IDA / 61110 Post Direct Selection Direct 220,000.00 0.00 Canceled environnementale et sociale the business climate for 16 26 30 29 des travaux de commercial agriculture réhabilitation des pistes agricoles et des bâtiment dans la zone nord du Congo avec le CabinetCES CG-PDAC-639-C-CAB-ED- 20 / Renouvellement du contrat de contrôle et de surveillance des mesures Component 2: Improving environnementales et public infrastructure and 2020-10- 2020-09- 2020-11- 2021-01- 2021-07- sociales des travaux de IDA / 61110 Post Direct Selection Direct 88,500.00 0.00 Under Review the business climate for 30 02 09 13 12 réhabilitation des pistes et commercial agriculture de construction des bâtiments Départements Cuvette Cuvette-Ouest Sangha, Likouala avec le cabinet CES CG-PDAC-640-CAB-ED-20 / Recrutement d'un cabinet Component 3: chargé de la reconstitution Strengthening institutional des comptes du PDAC des 2020-10- 2020-10- 2020-10- 2020-09- 2021-01- 2020-10- 2021-07- 2020-12- IDA / 61110 capacity to support the Post Direct Selection Direct 80,000.00 49,728.23 Completed exercices 2017, 2028, 2019 20 26 30 28 03 01 02 07 development of commercial et 2020 (Janvier-septembre agriculture 2020) par entente directe avec le cabinet KPMG CG-PDAC-650-C-CAB-20 / Recrutement d'un Component 1: Direct consultant pour l'étude sur support to producer Individual Under 2020-12- 2021-02- 2021-02- 2021-02- 2021-03- 2021-09- l'évolution des productions IDA / 61110 groups and agribusiness Post Consultant Open 20,000.00 0.00 Implementation 15 23 02 23 30 26 et des rendements des micro, small and medium Selection spéculations à cycle court enterprises (MSMEs) financées par le PDAC CG-PDAC-632-C-ED-20 / Renouvellement du contrat de contrôle des travaux de pistes agricoles et de Component 2: Improving surveillance des mesures public infrastructure and 2020-11- 2020-11- 2021-01- 2021-07- IDA / 61110 Post Direct Selection Direct 284,400.00 0.00 Canceled environnementales et the business climate for 16 26 30 29 sociales des travaux de commercial agriculture réhabilitation des pistes et de construction des bâtiments avec le cabinet MANZI Sarl CG-PDAC-560-C-ED-20 / Component 3: Recrutement Responsable Strengthening institutional composante 1: Appui aux 2021-03- 2021-10- IDA / 61110 capacity to support the Post Direct Selection Direct 60,000.00 0.00 Canceled groupements et MPME 13 09 development of commercial agroindustrielles du PDAC agriculture Régularisation CG-PDAC-651-C-CI-20 / Recrutement de Monsieur Issa DRAME consultant Component 3: international pour Strengthening institutional Individual Under 2021-02- 2021-03- 2021-03- 2021-03- 2021-04- 2021-10- l'accompagnement de la IDA / 61110 capacity to support the Post Consultant Limited 28,000.00 0.00 Implementation 28 02 05 26 30 27 cellule suivi évaluation du development of commercial Selection PDAC agriculture (activité de la composante 3 catégorie consultant) CG-PDAC-648-C-ED-20 / Component 1: Direct Protocole d'accord avec support to producer Pending 2021-02- 2021-03- 2021-05- 2021-11- l'ADPME pour IDA / 61110 groups and agribusiness Post Direct Selection Direct 50,000.00 0.00 Implementation 28 10 14 10 l'accompagnement des micro, small and medium MPME financées par le PDAC enterprises (MSMEs) CG-PDAC-645-C-CI-20 / Component 3: Individual Recrutement Assistant en Strengthening institutional 2020-12- 2021-02- 2021-02- 2021-03- 2021-09- IDA / 61110 Prior Consultant Open 2,800.00 0.00 Canceled sauvegarde capacity to support the 15 02 23 30 26 Selection environnementale et sociale development of commercial du PDAC agriculture CG-PDAC-644-C-CI-20 / Component 3: Recrutement du Strengthening institutional Individual 2020-12- 2021-02- 2021-02- 2021-03- 2021-09- Responsable en sauvegarde IDA / 61110 capacity to support the Prior Consultant Open 4,600.00 0.00 Canceled 15 02 23 30 26 environnementale et sociale development of commercial Selection du PDAC agriculture CG-PDAC-649-C-ED-20 / Recrutement de Fonds national de développement agro sylvio pastotal pour Component 3: l'élaboration des manuels Strengthening institutional Pending 2020-12- 2020-12- 2021-02- 2021-08- des opérations de l'Agence IDA / 61110 capacity to support the Post Direct Selection Direct 200,000.00 0.00 Implementation 15 25 28 27 nationale du développement development of commercial de l'agriculture et de agriculture l'élevage et de l'agence nationale de la pêche et de l'aquaculture (Compo 3) CG-PDAC-562-C-ED-20 / Component 3: Recrutement de la Strengthening institutional Responsable de Suivi 2021-03- 2021-10- IDA / 61110 capacity to support the Post Direct Selection Direct 30,000.00 0.00 Canceled Environnemental et social 13 09 development of commercial du PDAC agriculture Régularisation CG-PDAC-563-C-ED-20 / Component 3: Recrutement du Comptable Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 44,000.00 0.00 Canceled du PDAC capacity to support the 13 09 Régularisation development of commercial agriculture CG-PDAC-564-C-ED-20 / Component 3: Recrutement de l'Ingénieur Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 44,000.00 0.00 Canceled Agronome du PDAC capacity to support the 13 09 Régularisation development of commercial agriculture CG-PDAC-565-C-ED-20 / Component 3: Recrutement de l'Assistante Strengthening institutional 2021-03- 2021-10- en Passation de Marchés du IDA / 61110 capacity to support the Post Direct Selection Direct 40,000.00 0.00 Canceled 13 09 PDAC development of commercial Régularisation agriculture CG-PDAC-566-C-ED-20 / Component 3: Recrutement de l'Assistant Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 28,000.00 0.00 Canceled comptable du PDAC capacity to support the 13 09 Régularisation development of commercial agriculture CG-PDAC-567-C-ED-20 / Component 3: Recrutement de l'Assistante Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 28,000.00 0.00 Canceled en communication du PDAC capacity to support the 13 09 Régularisation development of commercial agriculture CG-PDAC-568-C-ED-20 / Component 3: Recrutement de l'Assistante Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 28,000.00 0.00 Canceled de Direction du PDAC capacity to support the 13 09 Régularisation development of commercial agriculture CG-PDAC-569-C-ED-20 / Component 3: Recrutement du chauffeur Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 10,000.00 0.00 Canceled de l'UNCP 1 du PDAC capacity to support the 13 09 Régularisation development of commercial agriculture CG-PDAC-570-C-ED-20 / Component 3: Recrutement du chauffeur Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 10,000.00 0.00 Canceled de l'UNCP 2 du PDAC capacity to support the 13 09 Régularisation development of commercial agriculture CG-PDAC-571-C-ED-20 / Component 3: Recrutement du chaffeur de Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 10,000.00 0.00 Canceled l'UNCP 3 du PDAC capacity to support the 13 09 Régularisation development of commercial agriculture CG-PDAC-573-C-ED-20 / Component 3: Recrutement du Chef Strengthening institutional 2021-03- 2021-10- d'Antenne du PDAC de IDA / 61110 capacity to support the Post Direct Selection Direct 50,000.00 0.00 Canceled 13 09 Pointe-Noire development of commercial Régularisation agriculture CG-PDAC-574-C-ED-20 / Component 3: Recrutement du Chef Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 50,000.00 0.00 Canceled d'Antenne du PDAC de capacity to support the 13 09 Nkayi development of commercial Régularisation agriculture CG-PDAC-575-C-ED-20 / Component 3: Recrutement du Chef Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 50,000.00 0.00 Canceled d'Antenne du PDAC de capacity to support the 13 09 Kinkala development of commercial agriculture Component 3: CG-PDAC-576-C-ED-20 / Strengthening institutional 2021-03- 2021-10- Recrutement du Chef IDA / 61110 Post Direct Selection Direct 50,000.00 0.00 Canceled capacity to support the 13 09 d'Antenne du PDAC de Ngo development of commercial agriculture CG-PDAC-577-C-ED-20 / Component 3: Recrutement du comptable Strengthening institutional 2021-03- 2021-10- de l'Antenne du PDAC de IDA / 61110 capacity to support the Post Direct Selection Direct 18,000.00 0.00 Canceled 13 09 Pointe-Noire development of commercial Régularisation agriculture CG-PDAC-578-C-ED-20 / Component 3: Recrutement du comptable Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 18,000.00 0.00 Canceled de l'Antenne du PDAC de capacity to support the 13 09 Nkayi development of commercial agriculture CG-PDAC-579-C-ED-20 / Component 3: Recrutement du comptable Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 18,000.00 0.00 Canceled de l'Antenne du PDAC de capacity to support the 13 09 Kinkala development of commercial Régularisation agriculture CG-PDAC-580-C-ED-20 / Component 3: Recrutement du comptable Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 18,000.00 0.00 Canceled de l'Antenne du PDAC de capacity to support the 13 09 Ngo development of commercial Régularisation agriculture CG-PDAC-581-C-ED-20 / Component 3: Recrutement de la Strengthening institutional 2021-03- 2021-10- secrétaire de l’Antenne du IDA / 61110 capacity to support the Post Direct Selection Direct 16,000.00 0.00 Canceled 13 09 PDAC de Pointe-Noire development of commercial Régularisation agriculture CG-PDAC-582-C-ED-20 / Component 3: Recrutement de la Strengthening institutional 2021-03- 2021-10- secrétaire de l’Antenne du IDA / 61110 capacity to support the Post Direct Selection Direct 16,000.00 0.00 Canceled 13 09 PDAC de Nkayi development of commercial Régularisation agriculture CG-PDAC-583-C-ED-20 / Component 3: Recrutement de la Strengthening institutional 2021-03- 2021-10- secrétaire de l’Antenne du IDA / 61110 capacity to support the Post Direct Selection Direct 16,000.00 0.00 Canceled 13 09 PDAC de Kinkala development of commercial Régularisation agriculture CG-PDAC-584-C-ED-20 / Component 3: Recrutement de la Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 16,000.00 0.00 Canceled secrétaire de l’Antenne du capacity to support the 13 09 PDAC de Ngo development of commercial Régularisation agriculture CG-PDAC-585-C-ED-20 / Component 3: Recrutement du chauffeur Strengthening institutional 2021-03- 2021-10- de l’Antenne du PDAC de IDA / 61110 capacity to support the Post Direct Selection Direct 9,000.00 0.00 Canceled 13 09 Pointe-Noire development of commercial Régularisation agriculture Page 13 CG-PDAC-586-C-ED-20 / Component 3: Recrutement du chauffeur Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 9,000.00 0.00 Canceled de l’Antenne du PDAC de capacity to support the 13 09 Nkayi development of commercial Régularisation agriculture CG-PDAC-587-C-ED-20 / Component 3: Recrutement du chauffeur Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 9,000.00 0.00 Canceled de l’Antenne du PDAC de capacity to support the 13 09 Kinkala development of commercial Régularisation agriculture CG-PDAC-588-C-ED-20 / Component 3: Recrutement du chauffeur Strengthening institutional 2021-03- 2021-10- IDA / 61110 Post Direct Selection Direct 9,000.00 0.00 Canceled de l’Antenne du PDAC de capacity to support the 13 09 Ngo development of commercial Régularisation agriculture CG-PDAC-0136-C-CI-18 / Component 3: Recrutement d'un Strengthening institutional Individual consultant chargé de faire 2018-11- 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- 2019-09- IDA / 61110 capacity to support the Post Consultant Open 30,000.00 0.00 Canceled un état des lieux pour 22 04 10 07 31 08 07 03 development of commercial Selection l'amélioration de la filière agriculture semencière et l'accès aux géniteurs et alevins CG-PDAC-621-C-CI-20 / Recrutement d'un Component 3: consultant individuel pour Strengthening institutional Individual l'étude relative à 2020-11- 2021-02- 2021-01- 2021-01- 2021-03- 2021-08- IDA / 61110 capacity to support the Post Consultant Open 47,500.00 0.00 Canceled l'actualisation des 16 23 04 25 01 28 development of commercial Selection programmes agriculture d'enseignement des lycées agricoles et de l'Ecole Nationale Supérieure d'Agronomie et de Foresterie CG-PDAC-654-C-CI-21 / Component 3: Recrutement d’un Strengthening institutional Individual consultant pour Pending 2021-06- 2021-08- 2021-09- 2021-10- 2022-04- IDA / 61110 capacity to support the Post Consultant Open 6,000.00 0.00 l’actualisation des Implementation 30 18 08 13 11 development of commercial Selection programmes agriculture d’enseignement technique et professionnel agricole CG-PDAC-659-C-CI-21 / Component 2: Improving Etude technique pour Individual public infrastructure and Pending 2021-06- 2021-08- 2021-09- 2021-10- 2022-04- l’électrification de IDA / 61110 Post Consultant Open 50,000.00 0.00 the business climate for Implementation 30 18 08 13 11 l’agropole de Dihesse et du Selection commercial agriculture CAT Inoni et Etsouali CG-PPDAC-672-C-CI-21 / Recrutement d’un Component 3: consultant chargé de la Strengthening institutional Individual poursuite de la mise en Pending 2021-06- 2021-07- 2021-07- 2021-08- 2022-02- IDA / 61110 capacity to support the Post Consultant Limited 50,000.00 0.00 conformité des Implementation 30 05 26 30 26 development of commercial Selection groupements et agriculture coopératives à l’Acte uniforme de l’OHADA relatif au droit des sociétés coopératives CG6PDAC-680-C-CI-21 / Recrutement d'un Component 2: Improving consultant en charge de Individual public infrastructure and Pending 2021-06- 2021-07- 2021-07- 2021-08- 2022-02- réaliser l'étude technique IDA / 61110 Post Consultant Limited 10,000.00 0.00 the business climate for Implementation 30 05 26 30 26 pour l'aménagement du Selection commercial agriculture centre agropastoral Bikongono, dans le District de Nzamba Nzassi CG-PDAC-684-C-CI-21 / Recrutement d'un Component 3: consultant individuel pour Strengthening institutional Individual Pending 2021-06- 2021-07- 2021-07- 2021-08- 2022-02- étude technique relative aux IDA / 61110 capacity to support the Post Consultant Limited 10,000.00 0.00 Implementation 30 05 26 30 26 travaux de réhabilitation du development of commercial Selection bâtiment d'insémination agriculture artificielle à Kombé CG-PDAC-685-C-CI-21 / Recrutement d'un Component 3: consultant individuel pour Strengthening institutional Individual Pending 2021-06- 2021-07- 2021-07- 2021-08- 2022-02- l'étude de faisabilité relative IDA / 61110 capacity to support the Post Consultant Limited 10,000.00 0.00 Implementation 30 05 26 30 26 à la réhabilitation des radios development of commercial Selection rurales de Loutété, agriculture Brazzaville, Owando, Etoumbi et Enyelle Page 14 Procurement Plan For Integrated Development for Source Sustainability and Climate Resilient Rain-fed Agriculture Project A World Bank Financed Project Project ID: P165129 [Procurement Plan Period: First 18 months of the Project] Covering the Period: January 2020 to June 2021 Submitted By Project Management Unit [PMU] Himachal Pradesh Forest Department Government of Himachal Pradesh India 2 3 PROCUREMENT PLAN Country: INDIA Borrower: Government of India on behalf of Government of Himachal Pradesh Project Name: Integrated Development for Source Sustainability and Climate Resilient Rain-fed Agriculture Project Project Implementation Agency: Project Management Unit [PMU], Himachal Pradesh Forestry Department [HPFD], Government of Himachal Pradesh Date of General Procurement Notice: December 18, 2019 Bank’s Approval Date of the Procurement Plan: Original … Revision 1: Revision 2: Date of the Procurement Plan: December 2019 Period covered by this Procurement Plan: January 2020 to June 2021 Applicable Procurement Rules. The Procurement of goods, works, consulting and non-consulting services to be financed by the Loan will be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers [dated July 2016; revised November 2017 and August 2018], and the provisions of the Loan Agreement. If there is conflict between government decrees, rules, and regulations and the Bank Procurement Regulations, then Bank’s Procurement Regulations shall prevail. The project will be subject to World Bank Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants [“Anti-Corruption Guidelines”], dated October 15, 2006 and revised in January 2011 and as of July 1, 2016. The project will use the online tool Systematic Tracking of Exchanges in Procurement [STEP] to prepare, clear, and update its procurement plan, for monitoring procurement activities and for communication between the Borrower and the Bank. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under Paragraph 4.4 of the Procurement Regulations are set forth in STEP. Unless otherwise agreed with the World Bank, the World Bank’s Standard Procurement Documents [SPD], Requests for Proposals, and Forms of Consultant Contract will be used. Procurement under national procedures will be carried out based on National Procurement Procedures [NPP] conditions agreed with the Government of India. Procurement estimated at Indian Rupees [INR] 5 Lakhs and above will be submitted through government eProcurement systems provided by NIC 4 www.hptender.gov.in which have been assessed and deemed acceptable by the Bank against Multilateral Development Bank [MDB] requirements. Financial Management [FM] Manual. The FM Manual prepared for the project shall have a separate chapter on Procurement which will provide clear guidance on applicable procurement arrangement, procedures and thresholds, and shall be made available on the project website. Community Operations Manual [COM]. The COM prepared for the project will have clear directives for the community [GPs/individual beneficiaries] with regard to eligible procurement expenditures and agreed procurement arrangements, procedures and thresholds, and shall be made available on the project website. This will serve as a guidebook for procurement, with a view to providing operating instructions and bring in greater transparency and predictability in procurement procedures under the Project. Procurement Arrangements and Profile. Procurement under the Project will be carried out at the central level by the Project Management Unit [PMU] headed by the Chief Project Director [CPD] established for the Project, at the District level by the District Project Officers assisted by the Accounts Assistant at the District Level in each of the 10 District Project Offices [DPOs] located in the Districts covered under the Project [Shimla, Solan, Sirmour, Bilaspur, Hamirpur, Mandi, Kullu, Chamba, Kangra and Una], and by beneficiary GPs [supported by DPOs] at the GP level, in accordance with their approved Gram Panchayat Resource Management Plans [GP-RMP]/MG/OMIF. Officials of the PMU have prior experience of implementing a World Bank financed project and have also undergone training in STEP. GPs will need to be capacitated and provided basic procurement training on applicable procurement procedures and procurement documentation requirements outlined in COM, before initiating their procurements. To meet the readiness requirements of the Department of Economic Affairs [DEA] of the Government of India, the Project has already initiated and awarded contract for critical consultancy package for Environmental and Social Assessment to be retroactively financed by the Bank. The project envisages procurement of low-risk, low-value goods, works and services as below: a. Goods and Non-Consulting Services to be procured under the project are likely to include the following. At State/PMU level, purchase of IT Equipment such laptops, computers, printer, etc., procurement of printing services for IEC, office vehicles, office furniture, etc. are envisaged. At District and GP level, procurement activities will include procurement of Barbed Wire, U/Staple, Tools, Gunny Bags, Vermicompost/ Farm yard Manure, Sand, Seeds, Wooden posts/ poles, Seedlings, Grass tufts, Sign boards/hand prints, seed testing instrument, Seed, Fertilizer, Pesticide, Livestock - Small and Large Ruminants, Agricultural Tools and Implements, equipment, Farm machinery, e.g., power tiller, chaff cutters, pipes, tarpaulins, Medicines, supplements, sprinklers, seedlings, etc. b. Procurement of Minor Civil Works is likely to include the following. At State/ PMU level, procurement of minor civil works will include extension, refurbishment and repair of office buildings, etc. At District and GP level, procurement activities will include procurement of works for construction of Water storage tanks, water channels, vermicompost pits, livestock Mangers, foot bridges, water lifting pumps, GI pipes, accessories, installation of ropeways, Ponds, Check Dams, Subsurface Dykes, Sump Wells etc. and labor contracts for preparing land 5 for nursery, preparing nursery beds, water tank, works of filling gunny bags, sowing of seeds, preparing temporary nursery sheds, watering, hoeing, weeding, , fencing, bush cutting, pit digging, planting seedlings, preparing contour trenches, planting grass tufts, drainage line treatment works, fire management works, allowances and incentives for fire management, Spring development, eradication of exotic weed- lantana, etc. It may be noted that civil works at GP level are demand driven. There are no major civil works contracts envisaged in the project. c. Consultancy Services to be procured under the project are likely to include services for developing a web-based portal for Integrated Financial Management Information System [IFMS], Water Monitoring and Modelling, Value Chain Scoping Studies, Technical Support Study for addressing the needs of Transhumant, M and E, MIS, Baseline Survey, External and Internal Audit, Third Party Verification agent to verify achievement of Disbursement Related Results [DLR]s, need based assessments and studies, individual experts, etc. No consultancy services contracts envisaged at the District/Sub-district levels. The project includes several features of a decentralized, demand-driven project, and activities to be taken up at the community level by selected beneficiaries shall be as per the GP-RMP approved by the PMU of the HP Forestry Department/MG/OMIF. The threshold of procurement activities at community level is expected not to exceed Request for Quotation [RFQ] threshold. Community-level procurement shall follow Community-Driven Development [CDD] arrangements as per the Bank’s Procurement Regulations and as outlined in the Community Operations Manual [COM] currently under preparation. Given other on-going government programs, the activities to be funded following COM shall be identified upfront to avoid double-dipping and will require very close monitoring and oversight. Project Procurement Strategy for Development [PPSD] and Procurement Plan. According to the requirement of the Regulations, a Project Procurement Strategy for Development [PPSD] has been developed, based on which the Procurement Plan for the first 18 months has been prepared. The PPSD describes how procurement in this project will support the Project Development Objective [PDO] and deliver value for money under a risk-based approach. It provides adequate supporting market analysis for the selection methods detailed in the procurement plan. The procurement plan specifies for each contract: [i] a description of the activities/contracts; [ii] selection methods to be applied; [iii] estimated cost; [iv] time schedules; [v] World Bank review requirements; and [vi] any other relevant procurement information. PMU shall submit to the World Bank, for its review and approval, any updates of the procurement plan approved by the World Bank. The project will use Systematic Tracking of Exchanges in Procurement [STEP] system for all its procurement activities carried out at the PMU [Centre] and District levels. Summary from PPSD. The project is preparing its Procurement Strategy document. As per the draft document, the project’s total value is US $100 million of which procurement spend is approximately 80 %. Extensive market analysis has been carried out for procurement packages and decisions on packages are made to ensure adequate participation of bidders. Consultancy contracts are framed based on market research and packaging decided in terms of scope of services and period. Based on the need assessment, the project has decided to 6 use Government e Marketplace [GeM]1 for procurement of Goods up to US $100,000 and as mentioned under the paragraph in the Procurement Plan on National Procurement Procedures. Procurement Capacity Building. Though project staff has past experience of implementing World Bank financed HP Mid-Himalayan Watershed Development Project [HPMHWDP] governed by the Bank’s Procurement Guidelines, however, they need to be exposed to the Procurement Regulations applicable to the Project. HP Forestry Department will be sending key procurement staff of PMU and DPOs to the Indian Institute of Management [IIM], Lucknow or the Administrative Staff College of India [ASCI], Hyderabad from time to time to attend procurement training on World Bank Procurement Framework [PF] applicable to the project. Presently, project staff from PMU and two DPOs will be attending the two-week residential training program on World Bank Procurement Regulations conducted at ASCI, Hyderabad in February 2020. These officials will subsequently provide training to other project staffs prior to implementation of the procurement activities in the project. The PMU/DPOs/APOs will also provide basic procurement training to GPs/Beneficiaries once the Gram Panchayat Resource Management Plan [GP-RMP] is approved by DPO/PMU, and before commencing implementation of GP-RMP. The project officials can also avail of the free Massive Open Online Course on public procurement www.procurementlearning.org offered by the Bank to build their capacity. The Bank had already conducted one training on STEP for PMU officials and will organize STEP training again on need basis for the concerned DPOs staff in near future. Procurement Planning. For each contract to be financed by the Loan, the different procurement methods or consultant selection methods to be used, the need for pre-qualification, estimated costs, prior review requirements, and time frame will be reflected in the Procurement Plan to be agreed between the Borrower and the Bank team. The Procurement Plan will be uploaded in STEP by PMU/DPOs and the approved procurement plan will be disclosed on the project website and Bank’s external website. The procurement plan for the first 18 months of project implementation and all its updates will be submitted to the Bank through STEP, and will lay out the appropriate, fit for purpose market approach and selection methods for procurement of goods, works, non-consulting and consulting services financed by the Bank. It will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity. eProcurement. Currently, the Himachal Pradesh Forestry Department of the Government of Himachal Pradesh is using e-procurement system for its procurement. However, PMU housed in the Forestry Department will be carrying out procurement using eProcurement for the first time in the project, therefore, their capacity building needs to be done for eProcurement. The project will make use of Government of India’s National Informatics Centre [NIC] platform assessed by the Bank against Multilateral Development Bank [MDB] requirements for procurements estimated at INR 5 Lakhs and above. Advance Contracting with Retroactive Financing. For effective project implementation and start-up, the project has initiated advance contracting of critical consultancies for Preparation of Environmental and Social Framework [ESF] and Project Implementation Plan [PIP], and procurement of small value goods such 1 https://gem.gov.in/ 7 as tools, gunny bags, seeds, IT equipment and accessories, vehicles, etc.] and works [very small value labor contracts for Development of Nurseries [52 nos.] in 26 clusters in 10 Districts covering 428 GPs. The total value of this spend is approximately 1.2 % of the Bank loan. Payment made by PMU/HPFD for these contracts following World Bank procurement procedures during the 12 months prior to the tentative Loan signing date shall be eligible for retroactive financing. Record Keeping. All records pertaining to award of tenders/selection of consultants, including tender notification/advertisement, register pertaining to sale and receipt of bids, bid/proposal opening minutes, bid/technical and financial evaluation reports, comparative statements, Goods, Receipt Note [GRN] and all correspondence pertaining to bid evaluation, communication sent to/with the Bank in the process, bid securities, and approval of invitation/evaluation of bids/proposals would be maintained by the PMU and at DPO/GP level. Contract Management. The PMU, HPFD will be responsible for overall procurement and contract management under the project. At the Centre, procurement staff will be responsible for contract monitoring and supervision of contracts awarded by PMU. At DPO level, contract monitoring and supervision will be done by technical staff at DPOs/APOs level [Agriculture, Animal Husbandry/Engineering staff of technical wing of DPO level and Forest Extension and Social Extension staff at APO level] to ensure timely delivery of quality outputs from the procurement contracts in the project areas. All payments will be made by DPOs for district and sub-district level procurements after receipt of Goods receipt Note [GRN]. Work Completion Certificates, etc. The Integrated Financial Management Information System [IFMIS] being developed under the Project will facilitate monitoring of various procurement activities in terms of physical and financial achievements on a monthly basis. The day to day monitoring of procurement activities will be done by APOs/DPOs at field level which will be updated in the online web-based system at district level and will be reviewed by PMU at the Centre. Complaint Handling Mechanism. A complaint handling mechanism to address procurement-related complaints under the Project will be developed and implemented by the PMU/DPOs to the satisfaction of the Bank. Upon receipt of complaints, immediate action would be initiated to acknowledge the complaint and to redress it within a reasonable timeframe. All complaints will be addressed at levels higher than the level at which the procurement process was undertaken, or the decision was taken. Any complaint received will also be forwarded to the Bank for information, and the Bank would be kept informed after the complaint is redressed. Leased Assets: Not Applicable Procurement of Secondhand Goods: Not Applicable Domestic Preference: The provision of domestic preference will be applied in the evaluation of bids in accordance with Annex VI of the Regulations. Procurement Thresholds and Prior Review Thresholds. The table below describes various procurement methods to be used for activities financed by the Loan. 8 Table 1: Procurement Thresholds Procurement approach and method Thresholds [US$ equivalent] Open International [Goods, IT, and >10 million Non-consulting services] – Request for Bids [RFB] Open National [Goods, IT, and Non- >100,000 and up to 10 million consulting services] – Request for Bids [RFB] National Request for Quotation Up to 100,000 [RFQ] – [Goods/Works/Non- consulting Services] Open International [Works] – >40 million Request for Bids [RFB] Open National [Works] - Request for >100,000 and up to 40 million Bids [RFB] Direct Selection With prior agreement, based on justification Framework Agreement For Goods/Works/Non-consulting services: According to paragraphs 6.57-6.59 of Section VI of the Regulations. For Consulting services: According to paragraph 7.33 of Section VII the Regulations. Force Account In accordance with paragraphs 6.54 and 6.55 of Section VI of the Procurement Regulations, and with prior agreement in Procurement plan with the Bank. Consulting Services [Firms] CQS: As per requirements of paragraphs 7.11 and 7.12 of Section VII of the Regulations. LCS, FBS: in justified cases QCBS, QBS: in all other packages Shortlist of National Consultants Up to 800,000 Procurement prior-review thresholds2. Based on the current procurement risk rating of ‘Moderate’, the World Bank will prior review the following contracts: (a) Works [including turnkey, supply and installation of plant and equipment and PPP]: All contracts more than US $15 million equivalent 2 Determination of whether a contract meets the prior review threshold is based on : (i) the total value of the contract, including all taxes and duties payable under the contract; (ii) a contract whose cost estimate was below the Bank’s prior review threshold is subject to prior review if the price of the lowest evaluated responsive bid (or, in the case of consulting services, the financial offer of the selected firm) exceeds such threshold at the bid evaluation stage; and (iii) in the case of a slice and package arrangement, the prior review threshold is determined based on the aggregate value of individual contracts to be awarded under such arrangement. 9 (b) Goods and Information Technology: All contracts > US $4 million equivalent (c) Non-consulting Services: All contracts > US $4 million equivalent (d) Consulting Services: Firms: All contracts >US $2 million equivalent (e) Consulting Services: Individuals: All contracts > US $400,000 equivalent (f) Direct Selection: The justification of Direct Selection for all contracts The above thresholds are for the initial 18-month implementation period. Based on the procurement performance of the project, these thresholds may be subsequently modified. Even for large-value post review cases, the inputs of the World Bank on technical specifications will be obtained by the project. Irrespective of the thresholds, Terms of Reference shall be prior reviewed by Bank. The prior review thresholds will also be indicated in the Procurement Plan. The Procurement Plan will be subsequently updated annually [or at any other time if required] and will reflect any change in the prior review thresholds. The details of National Procurement Procedures are outlined in the Procurement Plan. Prior review contracts. In the case of contracts subject to prior review, PMU, HPFD/DPOs will seek the World Bank’s no objection before granting/agreeing to: [a] an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; [b] any substantial modification of the scope of Works, goods, IT system; non-consulting services, or consulting services and other significant changes to the terms and conditions of the contract; [c] any variation order or amendment [except in cases of extreme urgency] that, singly or combined with all variation orders or amendments previously issued, increases the original contract amount by more than 15 percent; and [d] the proposed termination of the contract. Complaints received in all prior review cases shall be sent to Bank for review and the response to the complaint in such cases, shall be cleared with the Bank. Complaints with allegations of fraud and corruption, shall be shared with Bank, irrespective of the thresholds. Disclosure of procurement information. The following documents shall be disclosed on the project/state websites: [a] Procurement Plan and its updates; [b] an invitation for bids for procurement of Works, Goods, IT system procurement and non-consulting services; [c] request for expression of interest for selection/hiring of consulting services; [d] contract awards of Works, Goods, IT system procurement and non-consulting services procured following international and national procedures; [e] a list of contracts/purchase orders placed following RFQ [Request for Quotation] procedures on a quarterly basis; [f] a list of contracts following direct contracting [DC] on a quarterly basis; [g] an annual financial and physical progress report of all contracts; and [h] an action taken report on the complaints received on a quarterly basis. The following details shall be sent to the World Bank for publishing on the United Nations Development Business and the World Bank external website: [a] Specific Procurement Notice [i.e., invitation for bids] for procurement of Works, Goods, IT system procurement and non-consulting services using open international procedures; [b] Requests for Expression of Interests above US $800,000; [c] contract award details of all procurement of Works, Goods, IT system procurement and non-consulting services using open international procedure; and [d] a list of contracts/purchase orders placed following DC procedures on a quarterly basis. Further, the implementing agency will also publish on their websites any information required under the provisions of ‘suo moto’ disclosure as specified by the Right to Information Act. 10 National Procurement Procedure Conditions. National competition for the procurement of Works, Goods, IT system procurement and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3–5.5 of Section V of the Regulations and the following provisions: I. Only the model bidding documents for National Competitive Procurement [NCP] agreed with the GOI Task Force [and as amended for time to time], shall be used for bidding. II. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. III. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises or enterprises from any given State. IV. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. V. Government e-Marketplace [GeM] set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations [RFQ] method. VI. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. VII. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. VIII. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. IX. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. X. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social [including sexual exploitation and abuse and gender-based violence], health and safety [“ESHS”] risks and impacts. Oversight and Monitoring by the Bank. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. The Bank may conduct, at any time, Independent Procurement Reviews [IPRs] of all the contracts financed under the loan. High risk procurements, if any, will be identified for increased procurement and contract management support and indicated in the procurement plan. Bank team will provide additional due diligence and independent review of the contract performance of such identified procurements. 11 Procurement Review by the PMU, HPFD. Independent procurement post review [PPR] with reporting requirements and agreed with the Bank [As per Para 4 of Annex II of the Procurement Regulations] will be undertaken for the project for PMU’s own internal due diligence. PMU will hire PPR consultants as per Terms of Reference and reporting requirements agreed with the Bank to conduct PPR of PMU and DPOs on a half yearly basis. Other Special Selection Arrangements/Requirement Procurement by communities will be governed by the procedures outlined in the Community Operations Manual [COM] currently under preparation and in accordance with Paras 6.52 and 6.53 of Section VI of the Regulations. COM will be disclosed on the Project website. Procurement Plan as per STEP Tables: 12 PROCUREMENT India : Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2020-10-20 Revised Plan Date(s): (comma delineated, leave blank if none) 2021-05-27 Project ID: P165129 GPN Date: 2019-12-19 Project Name: Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh Loan / Credit No: IBRD / 90410 D Executing Agency(ies): istrict Project Office, Una, Himachal Pradesh Forestry Department WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-DPO, UNA-179744-CW- RFQ / Site development of 7 Component 1. Sustainable number of new nurseries at Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 12,000.00 11,783.30 Completed 2020-06-17 2020-02-13 2020-08-12 2020-02-17 different location of District Quotations Envelope 25 Management Una and Kangra under DPO Una in FY 2019-20 & 2020- 21 IN-DPO, UNA-179758-CW- Component 1. Sustainable Request for Single Stage - One 2020-10- RFQ / Nursery seedling IBRD / 90410 Land and Water Resource Post Limited 49,305.00 55,167.23 Completed 2020-06-17 2020-02-20 2020-08-12 2020-08-01 Quotations Envelope 15 production Management IN-DPO, UNA-180012-CW- RFQ / Forestry planting Along drainage line (1100 plants per Component 1. Sustainable Request for Single Stage - One 2021-02- ha) in 133 ha area involving IBRD / 90410 Land and Water Resource Post Limited 120,000.00 105,590.25 Signed 2020-06-19 2020-06-25 2020-08-14 2020-08-13 Quotations Envelope 10 25 jobs at different locations Management in DPO Una during FY 2020- 21 IN-DPO, UNA-180013-CW- RFQ / forestry Plantations Component 1. Sustainable under Re- afforestation Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 95,000.00 63,347.53 Signed 2020-06-19 2020-06-25 2020-08-14 2020-08-13 Scheme (in open forest 800 Quotations Envelope 10 Management plants per ha) area 117 ha. at different locations in DPO Una IN-DPO, UNA-180016-CW- RFQ / forestry Plantations Component 1. Sustainable under Enrichment Scheme Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 123,500.00 50,397.85 Signed 2020-06-19 2020-06-25 2020-08-14 2020-08-13 (400 plants per ha), area 192 Quotations Envelope 10 Management ha at different locations and sites in DPO Una IN-DPO, UNA-180017-CW- RFQ / Primary Water Harvesting & Storage ponds Component 1. Sustainable Request for Single Stage - One 2020-12- with capacity of IBRD / 90410 Land and Water Resource Post Limited 9,800.00 5,336.08 Signed 2020-09-07 2021-02-11 2020-11-02 2021-03-03 Quotations Envelope 31 approximately 1300 cum shall Management be constructed in the project area at different locations IN-DPO, UNA-180131-CW- RFQ / Fencing work for New Component 1. Sustainable Request for Single Stage - One 2020-09- plantations to be raised in FY IBRD / 90410 Land and Water Resource Post Limited 171,000.00 194,450.87 Signed 2020-06-20 2020-06-20 2020-08-15 2020-08-11 Quotations Envelope 30 2020-21 for 41 jobs at Management different locations in DPO Una IN-DPO, UNA-180145-CW- RFQ / Contour trenches in Component 1. Sustainable plantation areas i/c grass Request for Single Stage - One 2021-02- IBRD / 90410 Land and Water Resource Post Limited 57,200.00 65,238.83 Signed 2020-06-20 2020-06-25 2020-08-15 2020-08-14 seedlings at different sites Quotations Envelope 11 Management involving 33 different jobs under DPO Una IN-DPO, UNA-182952-CW- RFQ / Maintenance of Component 1. Sustainable Nurseries under APO Una, Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 25,014.00 15,021.69 Signed 2020-07-12 2020-01-10 2020-09-06 2021-01-30 Thanakalan & Dehra during Quotations Envelope 05 Management 2020-21 up to 15 August, 2020. IN-DPO, UNA-184102-CW- RFQ / Construction of Component 1. Sustainable Under Vegetative Check Barriers Request for Single Stage - One 2020-12- IBRD / 90410 Land and Water Resource Post Limited 2,500.00 0.00 Implementat 2020-09-02 2020-10-15 under drainage line treatment Quotations Envelope 15 Management ion at various locations of DPO Una IN-DPO, UNA-190997-CW- RFQ / Drainage line treatment Component 1. Sustainable Request for Single Stage - One 2021-03- i/c Dry Stone check dams IBRD / 90410 Land and Water Resource Post Limited 126,200.00 67,734.70 Signed 2020-09-15 2020-10-28 2020-11-01 2020-12-10 Quotations Envelope 19 including 18 jobs/ contracts Management separately for each location. IN-DPO, UNA-184105-CW- RFQ / Spring development activities i/c Renovation of Well, springs, traditional water Component 1. Sustainable Request for Single Stage - One 2021-03- bauries, etc involving multiple IBRD / 90410 Land and Water Resource Post Limited 194,300.00 144,375.08 Signed 2020-09-20 2020-12-04 2020-11-15 2021-03-10 Quotations Envelope 25 contracts approximately 125 Management No. of jobs/contracts separately at each location in DPO Una. IN-DPO, UNA-191003-CW- RFQ / Drainage line treatment Component 1. Sustainable Pending Cement concrete check Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 9,350.00 0.00 Implementat 2020-09-20 2020-11-16 barriers approximately 10 no. Quotations Envelope 23 Management ion of multiple jobs/contracts separately at each location. Page 1 IN-DPO, UNA-195402-CW- RFQ / Grass seedling in reafforestation and Enrichment plantation areas Component 1. Sustainable Pending Request for Single Stage - One 2020-12- during 2020-21 (approx. 20 IBRD / 90410 Land and Water Resource Post Limited 12,600.00 0.00 Implementat 2020-09-26 2020-11-01 Quotations Envelope 07 Jos/ contracts) at various Management ion locations involving multiple contract i.e. separate contracts at each location. IN-DPO, UNA-195403-CW- RFQ / Grass Sowing/ Tufts along drainage line during Component 1. Sustainable Pending Request for Single Stage - One 2020-11- 2020-21. The approximate IBRD / 90410 Land and Water Resource Post Limited 17,500.00 0.00 Implementat 2020-09-24 2020-10-31 Quotations Envelope 27 number of jobs/ contracts is Management ion 10 i.e. separate contracts for each job. IN-DPO, UNA-195405-CW- RFQ / repair of existing water Component 1. Sustainable Request for Single Stage - One 2020-12- distribution system at Jankaur IBRD / 90410 Land and Water Resource Post Limited 3,400.00 3,526.24 Completed 2020-09-26 2020-10-12 2020-10-30 2020-10-26 Quotations Envelope 19 Forest nursery at Una Management involving single job/ contract. IN-DPO, UNA-200852-CW- RFQ / Management of exotic species i.e. Lantana eradication work shall be undertaken in 218 hac. area Component 1. Sustainable Request for Single Stage - One 2021-06- involving multiple jobs/ IBRD / 90410 Land and Water Resource Post Limited 73,000.00 98,568.00 Signed 2020-10-26 2020-10-28 2020-12-21 2020-12-09 Quotations Envelope 19 contracts (Approximate 20 Management No.) separately at each location keeping in view far and distant places involving local communities through IN-DPO, UNA-191847-CW- RFQ / Management of Exotic species lantana eradication in Component 1. Sustainable FY 2019-20. The No. of jobs/ Request for Single Stage - One 2020-12- IBRD / 90410 Land and Water Resource Post Limited 56,000.00 55,840.10 Signed 2020-11-17 2020-02-12 2020-12-14 2020-03-06 contracts are 21 for 192 Quotations Envelope 27 Management hectares for which separate RFQ was issued for each job/contract. IN-DPO, UNA-191849-CW- RFQ / Management of Exotic Component 1. Sustainable Request for Single Stage - One 2021-03- species i.e. 1st year IBRD / 90410 Land and Water Resource Post Limited 12,100.00 11,613.99 Signed 2020-11-23 2020-10-28 2020-12-17 2020-12-14 Quotations Envelope 16 maintenance of lantana Management treated areas during 2020-21 IN-DPO, UNA-191000-CW- RFQ / crate wire check Component 1. Sustainable barriers drainage line Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 93,000.00 52,253.20 Signed 2020-11-23 2020-11-03 2020-12-20 2020-12-14 treatment for approximate 15 Quotations Envelope 04 Management no. of Jobs/contracts separately and each location. IN-DPO, UNA-208990-CW- RFQ / Site development & Component 1. Sustainable Request for Single Stage - One 2021-01- fencing of forest nurseries at IBRD / 90410 Land and Water Resource Post Limited 17,000.00 15,877.70 Completed 2020-12-11 2020-02-13 2020-12-31 2020-03-09 Quotations Envelope 31 Chaplah, Chanour, Sapru & Management Bhatehar under DPO Una Component 1. Sustainable Under IN-DPO, UNA-208999-CW- Request for Single Stage - One 2021-03- IBRD / 90410 Land and Water Resource Post Limited 42,000.00 0.00 Implementat 2021-01-25 2021-02-17 RFQ / RCC Check dams Quotations Envelope 31 Management ion IN-DPO, UNA-208986-CW- Component 1. Sustainable RFQ / raising of nursery Request for Single Stage - One 2021-08- IBRD / 90410 Land and Water Resource Post Limited 80,000.00 94,673.98 Signed 2020-12-11 2020-10-03 2021-01-03 2021-03-03 seedling during 2020-21 up Quotations Envelope 31 Management to August 2021 IN-DPO, UNA-232946-CW- Component 1. Sustainable Request for Pending RFQ / Plantation along Request for Single Stage - One 2021-12- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 38,000.00 0.00 Implementat 2021-06-12 2021-07-10 drainage lines with grass Quotations Envelope 31 Management Bank-SPD) ion sowing/tufts during 2021-22 IN-DPO, UNA-232957-CW- Component 1. Sustainable Request for Pending RFQ / Re-afforestation 1st Request for Single Stage - One 2021-12- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 7,000.00 0.00 Implementat 2021-06-12 2021-07-10 year maintenance works of Quotations Envelope 30 Management Bank-SPD) ion plantation areas 2021-22 IN-DPO, UNA-232962-CW- Component 1. Sustainable Request for Pending RFQ / Spring Development Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 70,000.00 0.00 Implementat 2021-06-20 2021-07-30 traditional bouries/wells Quotations Envelope 20 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233205-CW- Component 1. Sustainable Request for Pending Request for Single Stage - One 2021-12- RFQ / Re-afforestation during IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 62,500.00 0.00 Implementat 2021-06-12 2021-07-10 Quotations Envelope 31 2021-22 Management Bank-SPD) ion IN-DPO, UNA-233211-CW- Component 1. Sustainable Request for Pending Request for Single Stage - One 2021-12- RFQ / Enrichment Plantations IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 39,000.00 0.00 Implementat 2021-06-12 2021-07-10 Quotations Envelope 31 during 2021-22 Management Bank-SPD) ion IN-DPO, UNA-233214-CW- Component 1. Sustainable Request for Pending RFQ / Along drainage line Request for Single Stage - One 2022-01- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 10,000.00 0.00 Implementat 2021-06-12 2021-07-10 plantation1st year Quotations Envelope 06 Management Bank-SPD) ion maintenance during 2021-22 IN-DPO, UNA-233221-CW- Component 1. Sustainable Request for Pending RFQ / Enrichment plantations Request for Single Stage - One 2022-01- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 8,000.00 0.00 Implementat 2021-06-12 2021-07-26 1st year maintenance during Quotations Envelope 22 Management Bank-SPD) ion 2021-22 IN-DPO, UNA-233223-CW- Component 1. Sustainable Request for Pending RFQ / Contour trenching and Request for Single Stage - One 2022-01- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 30,000.00 0.00 Implementat 2021-06-12 2021-07-12 grass seeding in plantation Quotations Envelope 08 Management Bank-SPD) ion areas during 2021-22 Page 2 IN-DPO, UNA-233232-CW- RFQ / Management of exotic Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- species i.e. eradication of IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 37,000.00 0.00 Implementat 2021-10-04 2021-11-08 Quotations Envelope 25 Lantana and other invasive Management Bank-SPD) ion alien species during 2021-22 IN-DPO, UNA-233235-CW- Component 1. Sustainable Request for Pending RFQ / 1st Year maintenance Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 5,000.00 0.00 Implementat 2021-10-04 2021-11-08 of Lantana infested areas Quotations Envelope 25 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233238-CW- Component 1. Sustainable Request for Pending RFQ / 2nd Year maintenance Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 5,300.00 0.00 Implementat 2021-10-04 2021-11-08 of Lantana infested areas Quotations Envelope 25 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233242-CW- Component 2. Improved Request for Pending Request for Single Stage - One 2022-03- RFQ / Ropeways and IBRD / 90410 Agricultural Productivity and Post Limited Quotations (Non 49,000.00 0.00 Implementat 2021-08-30 2021-10-15 Quotations Envelope 25 footbridges/path Value Addition Bank-SPD) ion IN-DPO, UNA-233252-GO- RFQ / Secondary water Component 2. Improved Request for Pending Request for Single Stage - One 2022-03- distribution and water use IBRD / 90410 Agricultural Productivity and Post Limited Quotations (Non 70,000.00 0.00 Implementat 2021-08-25 2021-10-06 Quotations Envelope 25 efficiency (tanks, channels, Value Addition Bank-SPD) ion sprinklers, etc.) IN-DPO, UNA-233350-CW- Component 1. Sustainable Request for Pending RFQ / Dry Stone check Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 7,000.00 0.00 Implementat 2021-08-20 2021-10-02 Barriers along drainage line Quotations Envelope 22 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233351-CW- Component 1. Sustainable Request for Pending RFQ / Crate wire check Request for Single Stage - One 2022-03- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 40,000.00 0.00 Implementat 2021-08-20 2021-10-02 barriers along drainage line Quotations Envelope 22 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-233352-CW- Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- RFQ / Cement Concrete Check IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 45,000.00 0.00 Implementat 2021-08-20 2021-10-01 Quotations Envelope 20 barriers during 2021-22 Management Bank-SPD) ion IN-DPO, UNA-233354-CW- Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-08- RFQ / Nursery seedling IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 35,000.00 0.00 Implementat 2021-09-06 2021-10-08 Quotations Envelope 15 production during 2021-22 Management Bank-SPD) ion IN-DPO, UNA-233363-CW- Component 1. Sustainable Request for Pending RFQ / Vegetative check Request for Single Stage - One 2021-08- IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 3,500.00 0.00 Implementat 2021-06-21 2021-07-15 Barriers along drainage line Quotations Envelope 25 Management Bank-SPD) ion during 2021-22 IN-DPO, UNA-232970-CW- RFQ / Water harvesting structures such as Cement Component 1. Sustainable Request for Pending Request for Single Stage - One 2022-03- concrete check dams, earthen IBRD / 90410 Land and Water Resource Post Limited Quotations (Non 99,900.00 0.00 Implementat 2021-06-17 2021-08-07 Quotations Envelope 20 dams, masonry check dams, Management Bank-SPD) ion sub surface dykes, ponds , etc. during 2021-22 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-DPO, UNA-195721-GO- Component 1. Sustainable RFQ / Polythene bags Approx. Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 6,000.00 4,503.93 Completed 2020-10-01 2020-10-05 2020-11-03 2020-10-16 2020-11-19 2020-11-20 quantity 1.6 MT for raising of Quotations Envelope Management seedlings during 2020-21 IN-DPO, UNA-218485-GO- RFQ / Seeds, cultivation Component 2. Improved Request for Single Stage - One material & fertilizers for IBRD / 90410 Agricultural Productivity and Post Limited 12,000.00 12,001.56 Signed 2021-02-10 2020-10-07 2021-03-09 2021-02-16 2021-03-29 Quotations Envelope agriculture demonstration Value Addition plots IN-DPO, UNA-220767-GO- Component 1. Sustainable Request for Single Stage - One RFQ / Modern forest nursery IBRD / 90410 Land and Water Resource Post Limited 14,000.00 10,892.41 Signed 2021-03-03 2020-10-05 2021-03-25 2021-03-23 2021-03-31 Quotations Envelope equipment and seedlings Management IN-DPO, UNA-233247-GO- Component 2. Improved Pending RFQ / Pipes & pumps for Request for Single Stage - One IBRD / 90410 Agricultural Productivity and Post Limited 40,000.00 0.00 Implementati 2021-10-25 2021-12-10 2022-03-25 primary water distribution Quotations Envelope Value Addition on under component 2 IN-DPO, UNA-233254-GO- RFQ / Seeds, cultivation Component 2. Improved Pending material and technical inputs Request for Single Stage - One IBRD / 90410 Agricultural Productivity and Post Limited 18,000.00 0.00 Implementati 2021-06-20 2021-08-05 2022-03-25 for innovative practices for Quotations Envelope Value Addition on climate smart agriculture & high value crops IN-DPO, UNA-233359-GO- Component 1. Sustainable Pending RFQ / Polythene Bags for Request for Single Stage - One IBRD / 90410 Land and Water Resource Post Limited 7,000.00 0.00 Implementati 2021-08-06 2021-09-14 2021-10-14 Nursery seedling production Quotations Envelope Management on during 2021-22 IN-DPO, UNA-237569-GO- Component 1. Sustainable Pending Request for Single Stage - One RFQ / Wooden fence posts, IBRD / 90410 Land and Water Resource Post Limited 30,000.00 0.00 Implementati 2021-06-04 2021-06-27 2021-08-30 Quotations Envelope Barbed wire & U-staples Management on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 4 PROCUREMENT PLAN (Textual Part) Project information: Ukraine, EMPOWERING CIVIL SOCIETY AND JOURNALISTS IN OVERSIGHT AND PROMOTION OF EFFECTIVE ANTI- CORRUPTION ENVIRONMENT PROJECT, TF0B2997 Project Implementation agency: NGO Anti-Corruption Action Center Date of the Procurement Plan: September 14, 2020 Period covered by this Procurement Plan: September 2020 – December 31, 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Law of Ukraine “On Public Procurement”, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable; Works: is not applicable. Other Relevant Procurement Information. PROCUREMENT Ukraine : GPSA UKRAINE: EMPOWERING CIVIL SOCIETY AND JOURNALISTS IN OVERSIGHT AND PROMOTION OF EFFECTIVE ANTI-CORRUPTION ENVIRONMENT PROJECT PLAN General Information Country: Ukraine Bank’s Approval Date of the Original Procurement Plan: 2020-09-16 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172392 GPN Date: Project Name: GPSA UKRAINE: EMPOWERING CIVIL SOCIETY AND JOURNALISTS IN OVERSIGHT AND PROMOTION OF EFFECTIVE ANTI-CORRUPTION ENVIRONMENT PROJECT Loan / Credit No: TF / B2997 Civil society organization Anticorruption Action Center Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UA-ANTAC-FINAUDIT 2020- CS-CQS / The purpose of this Component 3: Improving procurement is to conduct a knowledge and learning on financial audit of the Consultant social accountability in the Under credibility of the annual TF / B2997 Post Qualification Open - National 3,000.00 0.00 2021-02-22 2021-02-22 2021-03-08 2021-03-03 2021-03-28 2021-04-07 2021-04-27 2021-06-26 Ukrainian anti-corruption Implementation financial statements of Anti- Selection sector and project Corruption Action Center for management. the period from January 1, 2020 to December 31, 2020. UA-ANTAC-EXTERNAL EVALUATOR-CS-CQS / Consultancy is to provide Component 3: Improving assistance to develop and knowledge and learning on Consultant implement the project’s MEL social accountability in the Pending TF / B2997 Post Qualification Open - International 8,000.00 0.00 2021-06-18 2021-07-02 2021-07-17 2021-07-27 2021-08-11 2021-12-31 system, strengthening the Ukrainian anti-corruption Implementation Selection project’s Theory of Action and sector and project associated Results management. Framework; supervising data collection and reporting INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UA-ANTAC-1.1.1-CS-INDV / Component 1. Capacity Individual 2020 Local Journalist Mentee TF / B2997 building for collaborative Post Consultant Open 4,200.00 4,172.26 Signed 2020-09-17 2020-09-22 2020-10-16 2020-11-02 2020-10-19 2020-11-02 2020-11-07 2020-11-03 2021-11-07 for Regional 1 social accountability. Selection UA-ANTAC-1.1.2-CS-INDV / Component 1. Capacity Individual 2020 Local Journalist Mentee TF / B2997 building for collaborative Post Consultant Open 4,200.00 4,252.25 Signed 2020-09-17 2020-09-22 2020-10-16 2020-11-02 2020-10-21 2020-11-02 2020-10-31 2020-11-03 2021-10-31 for Regional 1 social accountability. Selection UA-ANTAC-1.1.3-CS-INDV / Component 1. Capacity Individual 2020 Local Journalist Mentee TF / B2997 building for collaborative Post Consultant Open 4,200.00 4,266.71 Signed 2020-09-17 2020-09-22 2020-10-16 2020-11-02 2020-10-26 2020-11-02 2020-11-10 2020-11-03 2021-11-10 for Regional 1 social accountability. Selection UA-ANTAC-EXTERNAL EVALUATOR-CS-CDS / The firm is to provide expert Component 3: Improving technical assistance to knowledge and learning on develop and implement the social accountability in the project’s monitoring, TF / B2997 Post Direct Selection Direct 24,000.00 0.00 Canceled 2021-01-29 2021-02-18 2021-04-15 2023-06-16 Ukrainian anti-corruption evaluation and learning sector and project system, strengthening the management. project’s theory of action, supervising data collection and preparation of the reports. Page 1 Sample Procurement Plan Regional Disease Surveillance Systems Enhancement (REDISSE)(P154807) I. General 1. Bank’s approval Date of the procurement Plan [Original: July 2016]: Revision 1of Updated Procurement Plan, January 5th 2017 2. Date of General Procurement Notice: Dec 27, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year March to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Type of procurement Threshold US$ Works (including turnkey, supply & US$ 10 million installation of plant and equipment, and PPP) Goods, information technology and non- US$ 2 million consulting services 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: not applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued by WAHO 5. Any Other Special Procurement Arrangements: Not applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 4/4/2017 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 0.14 1 No Post of the NCB (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Type of procurement Prior Review Threshold US$ Consultants: firms US$ 1 million Consultants: individuals US$ 0.3 million 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comments of ed s by Bank Assignmen Cost (Prior / t US$ Post) million Summary 3.995 2 Prior of number of contracts that will be let under QCB Summary 0.22 2 Post Market of number approach: of Open 4/4/2017 contracts Internatio that will nal be let under CQS 4/4/2017 PROCUREMENT Western Africa : Regional Disease Surveillance Systems Enhancement (REDISSE) PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-04-27 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154807 GPN Date: Project Name: Regional Disease Surveillance Systems Enhancement (REDISSE) Loan / Credit No: IDA / 58820, IDA / 58830, IDA / D1290, IDA / D1310, IDA / D1300 Ministry of Health and Sanitation Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Pending SL-MOHS-117729-CW-RFQ / Component 1: Surveillance Request for Single Stage - One 2020-03- IDA / 58820 Post Limited 120,000.00 0.00 Implementat 2019-08-04 2019-09-29 Rehabilitate of 9 Major POEs and Information Systems Quotations Envelope 27 ion SL-MOHS-173796-CW-RFQ / Pending Construction/ Refurbishment Component 3: Preparedness Request for Single Stage - One 2021-03- IDA / 58820 Post Limited 100,000.00 0.00 Implementat 2020-08-04 2020-09-29 of Regional Vet Clinics in 2 and Emergency Response Quotations Envelope 28 ion Regions and rabies centers SL-MOHS-173799-CW-RFQ / Pending Construction of four Component 3: Preparedness Request for Single Stage - One 2021-04- IDA / 58820 Post Limited 70,000.00 0.00 Implementat 2020-09-05 2020-10-31 quarantine stations in (4) and Emergency Response Quotations Envelope 29 ion livestock entry points SL-MOHS-173740-CW-RFB / Construction of Facilities- Hospital, Cold rooms for CPHRL, 2 regional Pending Component 2: Strengthening Single Stage - One 2021-06- laboratories, including IDA / 58820 Post Request for Bids Open - National 1,000,000.00 0.00 Implementat 2020-09-01 2020-09-06 2020-10-18 2020-11-17 2020-12-22 of Laboratory Capacity Envelope 20 Construct or renovate ion dedicated specimen management and data managenent space SL-MOHS-221636-CW-RFQ / Pending Rehabilitation of borehole and Component 2: Strengthening Request for Single Stage - One 2021-12- IDA / 58820 Post Limited 8,000.00 0.00 Implementat 2021-04-28 2021-06-23 water purification systems at of Laboratory Capacity Quotations Envelope 20 ion CPHRL and 2 regional facilities SL-MOHS-239117-CW-RFB / Request for Bids - Engagement of Contractor for Pending Component 2: Strengthening Single Stage - One Works (without 2022-10- the Construction of Isolation, IDA / 58820 Post Request for Bids Open - National 3,000,000.00 0.00 Implementat 2021-12-16 2021-12-21 2022-02-01 2022-03-03 2022-04-07 of Laboratory Capacity Envelope prequalification) 04 Treatment and Intensive Care ion SPD Unit Hospital at Lungi SL-MOHS-237583-CW-RFQ / Engagement of Contractor for Request for Pending Component 2: Strengthening Request for Single Stage - One 2022-06- the Construction of Platforms, IDA / 58820 Post Limited Quotations (Non 200,000.00 0.00 Implementat 2021-11-06 2022-01-01 of Laboratory Capacity Quotations Envelope 30 Wall and Roof to House the Bank-SPD) ion Cold Rooms GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOHS-55703-GO-RFQ / Component 5: Institutional Procurement of Various Under Capacity Building, Project Request for Single Stage - One Stationery Items - A IDA / 58820 Post Limited 99,999.00 0.00 Implementati 2018-06-05 2018-07-31 2019-01-27 Management, Coordination, Quotations Envelope Framework Contract will be on and Advocacy signed afterwards. SL-MOHS-55701-GO-RFQ / Component 5: Institutional Pending Procurement of Fuel and Capacity Building, Project Request for Single Stage - One IDA / 58820 Post Limited 99,900.00 0.00 Implementati 2018-06-05 2018-07-31 2019-01-27 Lubricants - A Long Term Management, Coordination, Quotations Envelope on Agreement will be signed. and Advocacy SL-MOHS-55662-GO-RFQ / Procurement of: Cold Boxes, Freezers and Refrigerators the refrigerators with the cold boxes, freezers.This activity is Under Component 2: Strengthening Request for Single Stage - One under MoHS and they are not IDA / 58820 Post Limited 72,000.00 0.00 Implementati 2018-06-13 2018-08-08 2019-02-04 of Laboratory Capacity Quotations Envelope sure when this activity will be on implemented. The solar system is under MAFFS and they are ready to implemen SL-MOHS-64774-GO-RFQ / Procuring Drugs for community animal health workers. Drugs include Under Component 1: Surveillance Request for Single Stage - One IVERMECTIN SUPONA SPRAY IDA / 58820 Post Open - National 98,000.00 0.00 Implementati 2018-06-13 2018-08-08 2019-02-04 and Information Systems Quotations Envelope TYLOSINE INJECTION on OXTEXT INJECTION TMPS INJECTION VITAMIN BCO INJECTION MULTIVITAMINS INJECTION ETC SL-MOHS-64717-GO-RFB / Procurement of 64 Motor Bikes and Helmets, including Component 1: Surveillance Single Stage - One Licenses, Insurance. IDA / 58820 Post Request for Bids Open - National 220,000.00 0.00 Canceled 2018-06-12 2018-06-17 2018-07-29 2018-08-28 2018-10-02 2019-03-31 and Information Systems Envelope Motorbikes will be used by the Community Animal Health Workers Supervisors SL-MOHS-77669-GO-RFB / Procurement of 64 Motor Bikes and Helmets, including Component 1: Surveillance Single Stage - One Licenses, Insurance. IDA / 58820 Post Request for Bids Open - National 220,000.00 140,800.00 Signed 2018-10-03 2018-10-08 2018-10-08 2018-10-09 2018-11-19 2018-11-06 2018-12-19 2018-12-12 2019-01-23 2019-01-02 2019-07-22 and Information Systems Envelope Motorbikes will be used by the Community Animal Health Workers Supervisors Page 1 SL-MOHS-111697-GO-RFB / Procurement of Laboratory Component 2: Strengthening Single Stage - One IDA / 58820 Post Request for Bids Open - National 160,000.00 232,417.32 Completed 2019-05-15 2019-06-21 2019-05-20 2019-06-21 2019-07-01 2019-08-30 2019-07-31 2019-12-02 2019-09-04 2020-01-27 2020-03-02 2020-11-02 Reagents and Kits for of Laboratory Capacity Envelope epidemic prone diseases SL-MOHS-111656-GO-RFQ / Procurement of 24 Component 1: Surveillance Request for Single Stage - One IDA / 58820 Post Limited 66,000.00 62,400.00 Signed 2019-06-25 2019-08-19 2019-08-20 2019-10-17 2020-02-16 Refrigerators and 35 Cold and Information Systems Quotations Envelope Boxes SL-MOHS-111677-GO-RFQ / Pending Component 1: Surveillance Request for Single Stage - One Procurement of 32 Laptop IDA / 58820 Post Limited 44,800.00 0.00 Implementati 2019-07-28 2019-09-22 2020-03-20 and Information Systems Quotations Envelope Computers on SL-MOHS-111661-GO-RFQ / Supply and Installation of Component 1: Surveillance Request for Single Stage - One IDA / 58820 Post Limited 90,000.00 78,344.40 Completed 2019-07-01 2019-06-13 2019-08-26 2019-07-12 2020-02-22 2019-12-18 250w, 12v Solar system to and Information Systems Quotations Envelope power laptops and fridges SL-MOHS-117727-GO-RFB / Procurement of sterilizers, Component 3: Preparedness Single Stage - One IDA / 58820 Post Request for Bids Open - National 540,000.00 537,486.80 Completed 2019-08-15 2019-10-01 2019-08-20 2019-10-01 2019-11-04 2019-10-31 2019-12-03 2019-12-05 2019-12-10 2020-06-02 2019-12-24 disinfectants and Cleaning and Emergency Response Envelope Tools for PHUs SL-MOHS-119595-GO-RFQ / Component 2: Strengthening Request for Single Stage - One Procurement of Screening IDA / D1290 Post Limited 50,000.00 42,551.45 Completed 2019-07-06 2019-07-11 2019-08-31 2019-08-21 2020-02-27 2019-09-19 of Laboratory Capacity Quotations Envelope Test Kits and Reagents SL-MOHS-117725-GO-RFB / Pending procurement of 24 motor Component 1: Surveillance Single Stage - One IDA / D1310 Post Request for Bids Open - National 116,000.00 0.00 Implementati 2019-06-26 2019-07-01 2019-08-12 2019-09-11 2019-10-16 2020-04-13 bikes and accessories for and Information Systems Envelope on POEs and IPC Audit SL-MOHS-117726-GO-RFB / Procurement and installation Component 3: Preparedness Single Stage - One of video conferencing and IDA / D1310 Post Request for Bids Open - National 157,500.00 136,232.74 Signed 2019-11-10 2020-01-22 2019-11-15 2020-01-22 2019-12-27 2020-02-21 2020-01-26 2020-06-19 2020-03-01 2020-09-01 2020-08-28 and Emergency Response Envelope media monitoring equipment at National level SL-MOHS-159620-GO-RFQ / Component 3: Preparedness Request for Single Stage - One Procurement of Infra-red IDA / 58820 Post Limited 19,500.00 18,000.00 Completed 2020-02-29 2020-02-19 2020-04-25 2020-03-16 2020-10-22 2020-06-02 and Emergency Response Quotations Envelope Thermometers and Batteries SL-MOHS-159627-GO-RFQ / Component 3: Preparedness Request for Single Stage - One Procurement of assorted IPC IDA / 58820 Post Limited 97,500.00 97,040.00 Completed 2020-03-01 2020-02-19 2020-04-26 2020-03-17 2020-10-23 2020-05-07 and Emergency Response Quotations Envelope Consumeables SL-MOHS-159630-GO-RFQ / Supply and Installation of Component 2: Strengthening Request for Single Stage - One IDA / D1310 Post Limited 32,000.00 0.00 Canceled 2020-03-04 2020-04-29 2020-10-26 solar equipment for 24 hours of Laboratory Capacity Quotations Envelope at CPHRL SL-MOHS-173741-GO-RFB / Procurement of Medical Under Equipment and Consumables Component 2: Strengthening Single Stage - One IDA / 58820 Post Request for Bids Open - National 300,000.00 0.00 Implementati 2020-12-20 2020-08-10 2020-12-25 2020-08-10 2021-02-05 2021-03-07 2021-04-11 2021-10-08 for Regional Hospital of Laboratory Capacity Envelope on Facilities and laboratories in Bo and Makeni SL-MOHS-173743-GO-RFB / Procurement and installation of inverter battery back-up Under Component 2: Strengthening Single Stage - One system at Central Public IDA / D1310 Post Request for Bids Open - National 399,263.00 0.00 Implementati 2020-12-15 2020-08-10 2020-12-20 2020-08-10 2021-01-31 2021-03-02 2021-04-06 2021-10-03 of Laboratory Capacity Envelope Health Reference Laboratory on and in 2 Centers of Excellence SL-MOHS-173795-GO-RFQ / Pending Component 1: Surveillance Request for Single Stage - One Procurement of ICT materials IDA / 58820 Post Limited 25,000.00 0.00 Implementati 2020-11-04 2020-12-30 2021-06-28 and Information Systems Quotations Envelope for Early Warning System on SL-MOHS-173797-GO-RFQ / Pending Procurement of Vet Clinic Component 3: Preparedness Request for Single Stage - One IDA / 58820 Post Limited 50,000.00 0.00 Implementati 2020-10-05 2020-11-30 2021-05-29 Equipment, Fridges, Solar and Emergency Response Quotations Envelope on system Component 5: Institutional SL-MOHS-173807-GO-DIR / Capacity Building, Project Request for Single Stage - One IDA / D1310 Post Limited 50,000.00 0.00 Canceled 2020-06-10 2020-08-05 2021-02-01 Procurement of Motor Vehicle Management, Coordination, Quotations Envelope and Advocacy SL-MOHS-206125-GO-UN / Procurement of Reagents Component 2: Strengthening UN Agencies Blood Bags, Consumables IDA / 58820 Post Direct 300,000.00 300,000.00 Completed 2020-11-30 2020-11-24 2020-12-05 2020-11-27 2021-01-09 2020-12-22 2021-07-08 2021-02-18 of Laboratory Capacity (Direct) Equipment for National Safe Blood Transfusion Services SL-MOHS-217543-GO-RFQ / Procurement of Reagents and Pending Kits for Epidemic Prone Component 2: Strengthening Request for Single Stage - One IDA / D1310 Post Limited 44,000.00 0.00 Implementati 2021-02-15 2021-04-12 2021-10-09 Diseases ( Measles and of Laboratory Capacity Quotations Envelope on Rubella, YF; EVD; Dengue including Screening Kits) SL-MOHS-221563-GO-RFQ / Pending Component 1: Surveillance Request for Single Stage - One Print of 2000 Surgical Site IDA / 58820 Post Limited 8,000.00 0.00 Implementati 2021-03-16 2021-05-11 2021-11-07 and Information Systems Quotations Envelope Infection surveillance checklist on SL-MOHS-221572-GO-RFQ / printing of Animal Protection and health Bill, reporting tools Pending Component 1: Surveillance Request for Single Stage - One for wildlife, animal health IDA / 58820 Post Limited 32,800.00 0.00 Implementati 2021-04-14 2021-06-09 2021-12-06 and Information Systems Quotations Envelope disease reporting tools and on cross border surveillance tool and animal movement permit SL-MOHS-221604-GO-RFQ / Pending Procurement of water Component 2: Strengthening Request for Single Stage - One IDA / 58820 Post Limited 6,701.00 0.00 Implementati 2021-04-21 2021-06-16 2021-12-13 pumping machine for supply of Laboratory Capacity Quotations Envelope on and storing water Page 2 SL-MOHS-221607-GO-RFQ / Procurement of essential Pending Component 2: Strengthening Request for Single Stage - One laboratory equipment , IDA / 58820 Post Limited 25,000.00 0.00 Implementati 2021-05-16 2021-07-11 2022-01-07 of Laboratory Capacity Quotations Envelope reagents, kits and on consumables SL-MOHS-221639-GO-RFB / Procurement and installation Pending Component 3: Preparedness Single Stage - One of video conferencing and IDA / 58820 Post Request for Bids Open - National 132,500.00 0.00 Implementati 2021-05-20 2021-05-25 2021-07-06 2021-08-05 2021-09-09 2022-03-08 and Emergency Response Envelope media monitoring equipment on for four Regional District HQ Component 4: Human SL-MOHS-221647-GO-RFQ / Pending Resource Management for Request for Single Stage - One Printing of the NPHA strategic IDA / 58820 Post Limited 5,000.00 0.00 Implementati 2021-06-14 2021-08-09 2022-02-05 Effective Disease Surveillance Quotations Envelope and operational plans on and Epidemic Preparedness. SL-MOHS-221650-GO-RFQ / Component 5: Institutional Procurement of Colour Coded Pending Capacity Building, Project Request for Single Stage - One Bins and Liners and PPEs for IDA / 58820 Post Limited 8,222.00 0.00 Implementati 2021-06-05 2021-07-31 2022-01-27 Management, Coordination, Quotations Envelope Waste Handlers and on and Advocacy Incinerator Operators. SL-MOHS-173732-GO-RFQ / Procurement of essential Pending Component 2: Strengthening Request for Single Stage - One laboratory equipment, IDA / 58820 Post Limited 51,115.00 0.00 Implementati 2021-05-11 2021-07-06 2022-01-02 of Laboratory Capacity Quotations Envelope Reagents, kits and on consumables SL-MOHS-225039-GO-UN / Under Component 1: Surveillance Procurement of Yellow Fever IDA / 58820 Post Direct Selection Direct 10,204.08 0.00 Implementati 2021-05-13 2021-06-01 2021-05-18 2021-06-01 2021-06-22 2021-12-19 and Information Systems Vaccines on SL-MOHS-239103-GO-RFQ / Pending Procurement of Tablets for Component 1: Surveillance Request for Single Stage - One IDA / 58820 Post Limited 12,500.00 0.00 Implementati 2021-11-02 2021-12-28 2022-06-26 CAHW supervisors and District and Information Systems Quotations Envelope on Livestock Officers SL-MOHS-237587-GO-RFB / Procurement and installation Pending of Inverter Battery Back-Up Component 2: Strengthening Single Stage - One IDA / 58820 Post Request for Bids Open - National 849,269.00 0.00 Implementati 2021-09-02 2021-09-07 2021-10-19 2021-11-18 2021-12-23 2022-06-21 System at Central Public of Laboratory Capacity Envelope on Health Reference Laboratory and in Four Regional Labs SL-MOHS-237591-GO-DIR / Pending Component 2: Strengthening Purchase and Installation of IDA / 58820 Post Direct Selection Direct 80,000.00 0.00 Implementati 2021-08-04 2021-08-09 2021-09-13 2022-03-12 of Laboratory Capacity Mobile Incinerator on SL-MOHS-237585-GO-RFB / Procurement and Installation Pending of Containerized Cold Rooms Component 2: Strengthening Single Stage - One IDA / 58820 Post Request for Bids Open - National 500,000.00 0.00 Implementati 2021-10-08 2021-10-13 2021-11-24 2021-12-24 2022-01-28 2022-07-27 for Central Public Health of Laboratory Capacity Envelope on Reference and Four Regional Hospitals Laboratory NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOHS-55599-NC-RFQ / Vehicle rental. Component 5: Institutional Framework contract will be Pending Capacity Building, Project Request for Single Stage - One signed ending December 31 IDA / 58820 Post Limited 99,999.00 0.00 Implementati 2018-06-05 2018-07-31 2019-01-27 Management, Coordination, Quotations Envelope 2018. Spending is expected on and Advocacy not to be more than USD 99,999 SL-MOHS-62601-NC-RFQ / Procurement of Various Printing Materials for NPHA Component 4: Human strategic and operational Pending Resource Management for Single Stage - One plans, ACT Public Health IDA / 58820 Post Request for Bids Open - National 100,000.00 0.00 Implementati 2018-11-14 2018-11-19 2018-12-31 2019-01-30 2019-03-06 2019-09-02 Effective Disease Surveillance Envelope ordinance, on and Epidemic Preparedness. Guidelines,Strategic plan and protocols, one health , EDV Simulation booklets SL-MOHS-117421-NC-RFB / Disease Monitoring, Early Component 3: Preparedness Single Stage - One Warning and Public Health IDA / 58820 Post Request for Bids Open - National 350,000.00 330,500.00 Completed 2019-06-15 2019-07-10 2019-06-20 2019-08-08 2019-08-01 2019-08-13 2019-08-31 2019-10-22 2019-10-05 2019-12-19 2020-04-02 2020-08-17 and Emergency Response Envelope Incident ICT Management Systems Development SL-MOHS-173806-CS-CQS / Component 4: Human Under Pilot Medical Waste Resource Management for Single Stage - One IDA / D1300 Post Request for Bids Limited 300,000.00 0.00 Implementati 2020-06-10 2020-09-07 2020-06-15 2020-09-07 2020-07-27 2020-08-26 2020-09-30 2021-03-29 management Services in Effective Disease Surveillance Envelope on Freetown and Epidemic Preparedness. SL-MOHS-221599-NC-RFQ / Pending Component 2: Strengthening Request for Single Stage - One Provision of Security Services IDA / 58820 Post Limited 10,000.00 0.00 Implementati 2021-04-05 2021-05-31 2021-11-27 of Laboratory Capacity Quotations Envelope for Makeni Lab on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 SL-MOHS-62592-CS-UN / Assessment for the establishment of Regional Centers of Excellence. The objective of the Regional Component 2: Strengthening UN Agencies Pending Centres of Excellence will be IDA / 58820 Post Direct 40,000.00 0.00 2018-06-26 2018-12-23 of Laboratory Capacity (Direct) Implementation to provide a high concentration of expertise and related resources delivering associated care for clinical case management of c SL-MOHS-64712-CS-QCBS / Hiring a consultancy firm for Impact evaluation of Community Animal Health Workers program (and Component 1: Surveillance Quality And Cost- Under IDA / 58820 Post Open - International 350,000.00 0.00 2018-06-22 2018-07-13 2018-09-28 2018-08-26 2018-11-22 2018-09-23 2018-10-23 2018-11-27 2019-01-01 2020-01-01 performance-based and Information Systems Based Selection Implementation incentives) - before scale-up assessment. Evaluation of the program for 400 beneficiary communities SL-MOHS-80169-CS-QCBS / The hiring of Technical Component 1: Surveillance Quality And Cost- Assistance to Pilot Risk-based IDA / 58830 Post Open - International 600,000.00 0.00 Canceled 2018-10-05 2018-10-11 2018-10-26 2018-10-18 2018-12-09 2019-01-06 2019-02-05 2019-03-12 2019-04-16 2020-04-15 and Information Systems Based Selection Surveillance and risk profiling for SL SL-MOHS-83377-CS-CQS / Consultant Component 1: Surveillance Under TA Market Assessment of the IDA / D1290 Post Qualification Open - National 70,000.00 0.00 2018-11-02 2018-12-13 2018-11-23 2018-12-14 2019-01-06 2019-02-05 2019-03-12 2019-09-08 and Information Systems Implementation Health Sector in Sierra Leone Selection SL-MOHS-108044-CS-CDS / AUDIT OF FINANCIAL Component 5: Institutional RECORDS FOR THE REGIONAL Capacity Building, Project Least Cost Under IDA / 58820 Post Open - National 40,000.00 0.00 2019-04-12 2019-08-01 2019-05-03 2019-06-16 2019-07-14 2019-08-13 2019-09-17 2019-12-31 2020-06-28 DISEASE SURVEILLANCE Management, Coordination, Selection Implementation SYSTEM ENHANCEMENT and Advocacy PROJECT SL-MOHS-109611-CS-QCBS / Development of an Component 2: Strengthening Quality And Cost- Under Integrated Bio-security IDA / 58830 Post Open - International 500,000.00 0.00 2019-04-19 2019-04-25 2019-05-10 2020-02-01 2019-06-23 2019-07-21 2019-08-20 2019-09-24 2019-10-29 2020-10-28 of Laboratory Capacity Based Selection Implementation Laboratory Specimen Referral System in Sierra Leone SL-MOHS-154017-CS-QBS / INDEPENDENT AUDIT OF THE Component 5: Institutional 2019 FINANCIAL RECORDS Capacity Building, Project Least Cost Under IDA / 58820 Post Open - National 25,000.00 0.00 2020-01-31 2020-01-27 2020-02-21 2020-04-05 2020-05-03 2020-06-02 2020-07-07 2020-08-11 2021-02-07 FOR THE REGIONAL DISEASE Management, Coordination, Selection Implementation SURVEILLANCE SYSTEM and Advocacy ENHANCEMENT PROJECT SL-MOHS-109602-CS-QCBS / The hiring of Technical Component 1: Surveillance Quality And Cost- Assistance to Pilot Risk-based IDA / 58830 Prior Open - International 600,000.00 0.00 Canceled 2019-04-12 2019-05-20 2019-05-03 2019-05-28 2019-06-16 2019-09-03 2019-07-14 2019-10-07 2019-08-13 2019-09-17 2019-10-22 2020-10-21 and Information Systems Based Selection Surveillance and risk profiling for SL SL-MOHS-167342-CS-CQS / Consultancy Services for the Component 5: Institutional Consultant Upgrade and Training of Capacity Building, Project Pending IDA / 58830 Post Qualification Open - National 120,000.00 0.00 2020-04-15 2020-05-06 2020-06-19 2020-07-19 2020-08-23 2021-02-19 Designated IHPAU Staff to Management, Coordination, Implementation Selection Enhance optimal Usage of and Advocacy Sun Systems. SL-MOHS-173739-CS-QCBS / Design and Construction Supervision consultant for the Construction of Facilities- Component 2: Strengthening Quality And Cost- Pending IDA / D1310 Post Open - National 200,000.00 0.00 2020-06-15 2020-07-06 2020-08-19 2020-09-16 2020-10-16 2020-11-20 2020-12-25 2021-12-25 Hospital, Cold rooms for of Laboratory Capacity Based Selection Implementation Central Public Health Reference Laboratory (CPHRL) and 2 Regional Laboratories Component 5: Institutional SL-MOHS-173808-CS-LCS / Capacity Building, Project Least Cost Under 2020 Project Annual Audit IDA / D1310 Post Open - National 40,000.00 0.00 2020-11-01 2020-11-02 2020-11-22 2021-01-05 2020-11-16 2021-02-02 2020-12-15 2021-03-04 2021-03-16 2021-04-08 2021-05-13 2021-11-09 Management, Coordination, Selection Implementation Services and Advocacy SL-MOHS-239114-CS-CDS / Recruitment of Consultant for Consultant Supervision of the Isolation, Component 2: Strengthening Pending IDA / 58820 Post Qualification Open - National 250,000.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 Treatment and Intensive Care of Laboratory Capacity Implementation Selection Unit Construction Works at Lungi INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SL-MOHS-55693-CS-INDV / Component 5: Institutional Hiring of 3 (three) Project Individual Capacity Building, Project Officers. Salary for each is IDA / 58820 Post Consultant Open 72,000.00 0.00 Canceled 2018-05-25 2018-07-13 2018-08-03 2018-09-07 2019-03-06 Management, Coordination, 24,000 United States Dollars Selection and Advocacy for a period of one year each SL-MOHS-55815-CS-CDS / Hiring the services of an International Consultant to review and validate the Public Health Ordinance of 1965. Component 3: Preparedness Pending IDA / 58820 Post Direct Selection Direct 55,000.00 0.00 2018-05-31 2018-06-10 2018-08-14 2019-02-10 This is sole sourced because and Emergency Response Implementation this Consultant started this work with WHO and it now needs to be completed by the Ministry. SL-MOHS-55697-CS-INDV / Component 5: Institutional Individual Hiring of a Laboratory Capacity Building, Project Under IDA / 58820 Post Consultant Open 48,000.00 0.00 2018-10-08 2018-10-17 2018-11-26 2018-12-17 2019-01-21 2019-07-20 Consultant - Diagnostics Management, Coordination, Implementation Selection Services - MAFF. and Advocacy Page 4 SL-MOHS-55889-CS-INDV / Individual Hiring of a Consultant for the Component 2: Strengthening Under IDA / 58820 Post Consultant Open 45,000.00 0.00 2018-10-03 2018-10-17 2018-11-21 2018-12-12 2019-01-16 2019-07-15 review of the Animal Act / of Laboratory Capacity Implementation Selection Ordinance for MAFF SL-MOHS-77729-CS-INDV / Component 4: Human Hiring of Local Consultant to Individual Resource Management for Pending undertake to cost of the IDA / 58820 Post Consultant Open 6,000.00 0.00 2018-10-05 2018-11-23 2018-12-14 2019-01-18 2019-07-17 Effective Disease Surveillance Implementation activities identified within the Selection and Epidemic Preparedness. NPHA SL-MOHS-77846-CS-INDV / Individual TA to establish quarantine Component 1: Surveillance Under IDA / 58820 Post Consultant Open 20,000.00 0.00 2018-10-01 2019-01-24 2018-11-19 2018-12-10 2019-01-14 2019-07-13 surveillance station for animal and Information Systems Implementation Selection at Border District SL-MOHS-77845-CS-INDV / TA to assess the identified Individual areas for Construction Component 3: Preparedness IDA / 58820 Post Consultant Open 15,000.00 0.00 Under Review 2018-10-19 2020-01-22 2018-12-07 2018-12-28 2019-02-01 2019-07-31 /Refurbishment of Regional and Emergency Response Selection Vet Clinic and prepare Bills of Quantity SL-MOHS-83379-CS-INDV / Individual Consulting Services for the Component 1: Surveillance Pending IDA / D1290 Post Consultant Open 36,000.00 0.00 2018-11-02 2018-12-21 2019-01-11 2019-02-15 2019-08-14 hiring of an M&E Specialist and Information Systems Implementation Selection for MAF SL-MOHS-83383-CS-INDV / TA for the Development of Individual Emergency Response Component 1: Surveillance Pending IDA / D1290 Post Consultant Open 30,000.00 0.00 2018-11-08 2018-12-27 2019-01-17 2019-02-21 2019-08-20 Guidelines and Procedures for and Information Systems Implementation Selection Animal and Zoonotic Disease Outbreaks SL-MOHS-55572-CS-CDS / Hiring the Services of eHealth Africa to Maintain and Strengthen 117 as an early Component 1: Surveillance Pending warning system. eHealth has IDA / 58820 Post Direct Selection Direct 582,840.00 0.00 2018-10-05 2018-10-15 2018-12-19 2019-06-17 and Information Systems Implementation been managing this systems and so their services would be sole sources. See Single source justification SL-MOHS-96506-CS-INDV / TECHNICAL ASSISTANCE FOR THE Individual Component 2: Strengthening DEVELOPMENT/UPGRADING IDA / 58820 Post Consultant Open 15,000.00 18,850.00 Signed 2019-02-08 2019-02-04 2019-03-29 2019-06-07 2019-04-19 2019-08-07 2019-05-24 2019-08-09 2019-11-20 of Laboratory Capacity OF EXISTING TOOLS FOR ONE Selection HEALTH QUALITY ASSURANCE MONITORING SL-MOHS-96515-CS-INDV / TECHNICAL ASSISTANCE FOR Individual THE STRENGTHENING OF AN Component 2: Strengthening IDA / 58820 Post Consultant Open 15,000.00 22,700.00 Signed 2019-02-13 2019-02-05 2019-04-03 2019-06-07 2019-04-24 2019-06-17 2019-05-29 2019-08-16 2019-11-25 INTEGRATED LABORATORY of Laboratory Capacity Selection INFORMATION MANAGEMENT SYSTEM, LIMS SL-MOHS-96518-CS-INDV / TECHNICAL ASSISTANCE FOR THE ESTABLISHMENT OF A CENTRALISED ELECTRONIC Individual LABORATORY SUPPLY CHAIN Component 2: Strengthening Under IDA / 58820 Post Consultant Open 15,000.00 0.00 2019-02-15 2019-02-05 2019-04-05 2019-04-26 2019-05-31 2019-11-27 AND INVENTORY of Laboratory Capacity Implementation Selection MANAGEMENT SYSTEM FOR ANIMAL AND HUMAN HEALTH FOR THE DISTRIBUTION OF REAGENTS AND SUPPLIES SL-MOHS-111700-CS-INDV / Recruitment of Consultant Individual Component 3: Preparedness Under to Develop Community IDA / D1310 Post Consultant Open 15,000.00 0.00 2019-05-15 2021-06-17 2019-07-03 2019-07-24 2019-08-28 2020-02-24 and Emergency Response Implementation emergency preparedness Selection manuals for all districts SL-MOHS-111754-CS-INDV Component 5: Institutional Individual / Local consultancy for the Capacity Building, Project Under IDA / 58820 Post Consultant Open 15,000.00 0.00 2019-05-24 2019-06-17 2019-07-12 2019-08-02 2019-09-06 2020-03-04 development of one health Management, Coordination, Implementation Selection research agenda and Advocacy SL-MOHS-111768-CS-INDV / Local consultancy to develop Individual Component 3: Preparedness Under National Emergency IDA / 58820 Post Consultant Limited 16,500.00 0.00 2019-05-30 2019-06-17 2019-06-04 2019-06-25 2019-07-30 2020-01-26 and Emergency Response Implementation Preparedness and Response Selection Strategy SL-MOHS-111693-CS-INDV Individual Component 2: Strengthening Pending / Recruitment of three Senior IDA / 58820 Post Consultant Open 54,000.00 0.00 2019-06-20 2019-08-08 2019-08-29 2019-10-03 2020-03-31 of Laboratory Capacity Implementation Laboratory Technologist Selection SL-MOHS-111821-CS-INDV Individual Component 2: Strengthening Pending / Recruitment of Laboratory IDA / 58820 Post Consultant Open 14,400.00 0.00 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-04-11 of Laboratory Capacity Implementation Logistics Officer Selection SL-MOHS-111683-CS-INDV Individual Component 2: Strengthening / Recruitment of 2 Laboratory IDA / 58820 Post Consultant Open 48,000.00 0.00 Canceled 2019-07-25 2019-09-12 2019-10-03 2019-11-07 2020-05-05 of Laboratory Capacity Managers Selection SL-MOHS-111813-CS-INDV Individual Component 2: Strengthening Pending / Recruitment of Laboratory IDA / 58820 Post Consultant Open 14,200.00 0.00 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-04-11 of Laboratory Capacity Implementation M&E Officer Selection SL-MOHS-111810-CS-INDV Individual Component 2: Strengthening Pending / Recruitment of Laboratory IDA / 58820 Post Consultant Open 18,000.00 0.00 2019-07-10 2019-08-28 2019-09-18 2019-10-23 2020-04-20 of Laboratory Capacity Implementation Admin Officer Selection SL-MOHS-111753-CS-INDV Component 5: Institutional / Local consultancy for the Individual Capacity Building, Project Pending development of reporting IDA / 58820 Post Consultant Open 27,750.00 0.00 2020-01-10 2020-02-28 2020-03-20 2020-04-24 2020-10-21 Management, Coordination, Implementation tools and scorecards for one Selection and Advocacy health Page 5 SL-MOHS-159806-CS-CDS / Technical Assistance for Component 1: Surveillance Coordination and IDA / D1310 Prior Direct Selection Direct 39,000.00 39,000.00 Under Review 2020-03-16 2020-03-18 2020-03-26 2020-03-20 2020-05-30 2020-03-30 2020-11-26 and Information Systems Management of 117 Call Systems and Operations SL-MOHS-173783-CS-INDV Individual / Provision of Consultancy Component 1: Surveillance Pending IDA / 58820 Post Consultant Limited 9,800.00 0.00 2020-06-16 2020-06-21 2020-07-12 2020-08-16 2021-02-12 Services for the Assessment of and Information Systems Implementation Selection the MDSR SL-MOHS-173784-CS-INDV Individual Component 1: Surveillance Pending / Hiring of TA for Costing the IDA / 58820 Post Consultant Limited 5,934.00 0.00 2020-07-30 2020-08-04 2020-08-25 2020-09-29 2021-03-28 and Information Systems Implementation AMR Strategic Plan Selection SL-MOHS-173786-CS-INDV / Hiring of consultant for Individual Component 1: Surveillance development of WASH IDA / D1310 Post Consultant Limited 5,341.00 4,462.96 Signed 2020-07-15 2020-06-16 2020-07-20 2020-08-25 2020-08-10 2020-09-25 2020-09-14 2020-09-28 2021-03-13 and Information Systems emergency standards and Selection guidelines SL-MOHS-173792-CS-INDV / Hiring of consultant for Individual development of human and Component 1: Surveillance IDA / 58820 Post Consultant Limited 7,912.00 0.00 Canceled 2020-08-30 2020-09-04 2020-09-25 2020-10-30 2021-04-28 animal disease surveillance and Information Systems Selection database and data collection tools SL-MOHS-173801-CS-INDV / Technical Assistance for the Individual Preparation of Bills of Component 3: Preparedness Under IDA / D1310 Post Consultant Limited 10,000.00 0.00 2020-06-01 2020-07-06 2020-06-06 2020-06-27 2020-08-01 2021-01-28 Quantities , Specification and and Emergency Response Implementation Selection supervision of Quarantine Station Works SL-MOHS-173803-CS-INDV / Hire Technical Assistant to Individual Component 3: Preparedness Develop Community IDA / 58820 Post Consultant Limited 15,000.00 0.00 Canceled 2020-08-14 2020-08-19 2020-09-09 2020-10-14 2021-04-12 and Emergency Response emergency preparedness Selection manuals for all Districts. SL-MOHS-177211-CS-CDS / Foreign Medical Doctor: 8 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / 58820 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-06-08 2020-06-04 2020-06-18 2020-06-08 2020-08-22 2020-06-09 2021-02-18 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-177200-CS-CDS / Foreign Medical Doctor: 2 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / 58820 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-06-18 2020-06-04 2020-06-28 2020-06-07 2020-09-01 2020-06-09 2021-02-28 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-177215-CS-CDS / Foreign Medical Doctor: 10 Component 5: Institutional for the Provision of Capacity Building, Project Surveillance and Laboratory IDA / D1310 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-06-19 2020-06-04 2020-06-29 2020-06-08 2020-09-02 2020-06-09 2021-03-01 Management, Coordination, Services to Ministry of Health and Advocacy and Sanitation and Ministry of Agriculture SL-MOHS-177201-CS-CDS / Foreign Medical Doctor:3 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / 58820 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-06-11 2020-06-04 2020-06-21 2020-06-08 2020-08-25 2020-06-09 2021-02-21 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-177210-CS-CDS / Foreign Medical Doctor:7 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / D1290 Post Direct Selection Direct 36,000.00 30,000.00 Signed 2020-06-08 2020-06-04 2020-06-18 2020-06-24 2020-08-22 2020-06-09 2021-02-18 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-177191-CS-CDS / Foreign Medical Doctor: 1 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / 58820 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-06-19 2020-06-04 2020-06-29 2020-06-08 2020-09-02 2020-06-09 2021-03-01 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-177205-CS-CDS / Foreign Medical Doctor: 5 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / 58820 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-06-10 2020-06-04 2020-06-20 2020-06-08 2020-08-24 2020-06-09 2021-02-20 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-177208-CS-CDS / Foreign Medical Doctor:6 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / 58820 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-06-08 2020-06-04 2020-06-18 2020-06-08 2020-08-22 2020-06-09 2021-02-18 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-177202-CS-CDS / Foreign Medical Doctor:4 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / 58820 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-06-11 2020-06-04 2020-06-21 2020-06-05 2020-08-25 2020-06-09 2021-02-21 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture Page 6 SL-MOHS-177213-CS-CDS / Foreign Medical Doctor :9 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / 58820 Prior Direct Selection Direct 36,000.00 0.00 Canceled 2020-06-24 2020-06-27 2020-07-04 2020-09-07 2021-03-06 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-181278-CS-CDS / Foreign Medical Doctor: 9 for Component 5: Institutional the Provision of Surveillance Capacity Building, Project and Laboratory Services to IDA / D1290 Post Direct Selection Direct 36,000.00 36,000.00 Signed 2020-10-23 2020-10-24 2020-11-02 2020-10-24 2021-01-06 2020-06-09 2021-07-05 Management, Coordination, Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture SL-MOHS-181279-CS-CDS / Foreign Medical Doctor: 11for Component 5: Institutional the Provision of Surveillance Capacity Building, Project Under and Laboratory Services to IDA / 58820 Post Direct Selection Direct 36,000.00 0.00 2020-10-23 2020-10-24 2020-11-02 2021-01-06 2021-07-05 Management, Coordination, Implementation Ministry of Health and and Advocacy Sanitation and Ministry of Agriculture Component 5: Institutional SL-MOHS-199951-CS-CDS / Individual Capacity Building, Project Recruitment of International IDA / D1290 Post Consultant Open 160,000.00 139,300.00 Signed 2020-11-27 2020-11-17 2021-01-15 2021-02-16 2021-02-05 2021-02-23 2021-03-12 2021-03-01 2021-09-08 Management, Coordination, Procurement Specialist Selection and Advocacy SL-MOHS-205133-CS-INDV Component 5: Institutional Individual / Recruitment of Capacity Building, Project IDA / D1310 Post Consultant Open 180,000.00 140,000.00 Signed 2020-11-23 2020-11-25 2021-01-11 2021-03-10 2021-02-01 2021-03-15 2021-03-08 2021-04-01 2021-09-04 Environmental and Social Management, Coordination, Selection Safeguards Technical Advisor and Advocacy SL-MOHS-173736-CS-INDV Individual Component 2: Strengthening / Technical Assistance for the IDA / D1310 Post Consultant Limited 5,697.00 0.00 Canceled 2020-06-15 2020-08-05 2020-06-20 2020-07-11 2020-08-15 2021-02-11 of Laboratory Capacity Provision of Janitorial Services Selection Page 7 Improving the Performance of Non-Criminal Justice Services (P162833) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 05-Jun-2019 July 9, 2010 PROCUREMENT Peru : Improving the Performance of Non-Criminal Justice Services PLAN General Information Country: Peru Bank’s Approval Date of the Original Procurement Plan: 2020-12-22 2021-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162833 GPN Date: Project Name: Improving the Performance of Non-Criminal Justice Services Loan / Credit No: IBRD / 89750 MINISTERIO DE JUSTICIA Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Strengthening Pending PE-MINJUS-233775-GO-RFQ the institutionality of the non- Request for Single Stage - One IBRD / 89750 Post Limited 22,797.08 0.00 Implementati 2021-05-20 2021-06-12 2021-07-22 / Servidor Blade- Aplicaciones criminal justice Quotations Envelope on administration system Component 1: Strengthening PE-MINJUS-233779-GO-RFQ Pending the institutionality of the non- Request for Single Stage - One / Switch para red 24 puertos IBRD / 89750 Post Limited 20,733.38 0.00 Implementati 2021-05-20 2021-06-17 2021-07-17 criminal justice Quotations Envelope 56 Gbps on administration system PE-MINJUS-233780-GO-DIR Component 1: Strengthening Pending / Servicio se Suscripción del the institutionality of the non- IBRD / 89750 Post Direct Selection Direct 30,468.08 0.00 Implementati 2021-05-17 2021-05-22 2021-06-26 2021-07-26 Software de Base Datos Oracle criminal justice on Cloud administration system Component 1: Strengthening PE-MINJUS-233783-GO-RFQ Pending the institutionality of the non- Request for Single Stage - One / Capturador de imagen - IBRD / 89750 Post Limited 41,232.88 0.00 Implementati 2021-06-05 2021-07-03 2021-08-02 criminal justice Quotations Envelope Scanner de Producción on administration system Component 1: Strengthening Pending PE-MINJUS-233784-GO-RFQ the institutionality of the non- Request for Single Stage - One IBRD / 89750 Post Limited 38,356.16 0.00 Implementati 2021-06-03 2021-06-17 2021-07-17 / Nitro Pro PDF criminal justice Quotations Envelope on administration system Component 1: Strengthening PE-MINJUS-238927-GO-RFB Pending the institutionality of the non- Single Stage - One / Acumulador de energia UPS IBRD / 89750 Post Request for Bids Open - National 60,545.63 0.00 Implementati 2021-06-25 2021-06-30 2021-08-11 2021-09-10 2021-10-15 2021-11-14 criminal justice Envelope APC + Bateria 12V on administration system PE-MINJUS-238946-GO-RFB / Software de virtualizacion VMWARE Datacenter: Vmware vSAN (6), Vmware Vsphere (6), Component 1: Strengthening Pending Vcenter (1), soporte 8X5 por 5 the institutionality of the non- Single Stage - One IBRD / 89750 Post Request for Bids Open - National 177,511.66 0.00 Implementati 2021-06-28 2021-07-01 2021-08-10 2021-09-04 2021-09-24 2021-10-24 años + Servicios de criminal justice Envelope on implementación + administration system capacitación + Licencia Windows Server 2019 datacenter con soporte 5 años PE-MINJUS-238953-GO-RFB Component 1: Strengthening / Suscripción de Software de Pending the institutionality of the non- Single Stage - One Sistema Operativo Red Hat IBRD / 89750 Post Request for Bids Open - National 73,786.13 0.00 Implementati 2021-06-28 2021-07-01 2021-07-31 2021-08-10 2021-09-04 2021-10-04 criminal justice Envelope Enterprise Linux Server o on administration system Equivalente + soporte 5 años NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-MINJUS-221669-CS-CQS / Servicio de Consultoría para el Estudio Definitivo para el Proyecto Mejoramiento de los Component 2: Improving the Consultant Servicios Administrativos de production, analysis and use Under IBRD / 89750 Post Qualification Limited 53,418.41 0.00 2021-03-22 2021-06-16 2021-04-05 2021-05-05 2021-06-09 2021-12-06 Justicia del Tribunal of information of the justice Implementation Selection Constitucional mediante la administration system Implementación del Expediente Judicial Electrónico de CUI Nº 2412543 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Reducing PE-MINJUS-207945-CS-INDV socio-economic, cultural and Individual / Servicio de CI - Especialista IBRD / 89750 geographic barriers to access Post Consultant Open 12,328.77 12,381.17 Signed 2020-12-03 2020-11-27 2020-12-15 2020-12-11 2020-12-20 2020-12-14 2020-12-22 2020-12-15 2021-03-22 Legal to justice for vulnerable Selection populations. Page 1 Component 3: Reducing PE-MINJUS-207949-CS-INDV socio-economic, cultural and Individual / Servicio de CI - Especialista IBRD / 89750 geographic barriers to access Post Consultant Open 12,328.77 12,381.17 Signed 2020-12-03 2020-11-27 2020-12-14 2020-12-11 2020-12-17 2020-12-15 2020-12-19 2020-12-15 2021-03-19 en Sociología to justice for vulnerable Selection populations. Component 3: Reducing PE-MINJUS-207954-CS-INDV socio-economic, cultural and Individual / Servicio de CI - Especialista IBRD / 89750 geographic barriers to access Post Consultant Open 12,328.77 12,381.17 Signed 2020-12-03 2020-11-27 2020-12-14 2020-12-07 2020-12-17 2020-12-14 2020-12-19 2020-12-15 2021-03-19 en Infraestructura to justice for vulnerable Selection populations. Component 3: Reducing PE-MINJUS-207965-CS-INDV socio-economic, cultural and Individual / Servicio de CI - Especialista IBRD / 89750 geographic barriers to access Post Consultant Open 12,328.77 12,381.17 Signed 2020-12-03 2020-11-27 2020-12-14 2020-12-14 2020-12-17 2020-12-14 2020-12-19 2020-12-15 2021-03-19 en Tecnologías de la to justice for vulnerable Selection Información populations. Component 3: Reducing PE-MINJUS-207969-CS-INDV socio-economic, cultural and Individual / Servicio de CI - Especialista IBRD / 89750 geographic barriers to access Post Consultant Open 12,328.77 12,381.17 Signed 2020-12-10 2020-11-27 2020-12-15 2020-12-14 2020-12-18 2020-12-14 2020-12-20 2020-12-15 2021-03-20 en Procesos to justice for vulnerable Selection populations. PE-MINJUS-208055-CS-INDV Component 1: Strengthening Individual / Servicio de elaboración de the institutionality of the non- IBRD / 89750 Post Consultant Open 8,767.12 8,804.39 Signed 2020-12-10 2020-11-30 2021-01-15 2020-12-14 2021-02-05 2020-12-14 2021-03-12 2020-12-15 2021-09-08 Plan de Gobierno Digital para criminal justice Selection el TC administration system PE-MINJUS-208163-CS-INDV Component 1: Strengthening / Servicio de Análisis y Individual the institutionality of the non- Diagnóstico de Procesos IBRD / 89750 Post Consultant Open 5,479.45 5,502.74 Signed 2020-12-10 2020-11-30 2020-12-14 2020-12-07 2020-12-17 2020-12-14 2020-12-19 2020-12-15 2021-02-02 criminal justice Jurisdiccionales y Selection administration system Administrativos del TC PE-MINJUS-208052-CS-CDS / Desarrollo de Encuesta de Percepción Ciudadana Inicial acerca de los Servicios que Component 3: Reducing brindan los Centros de socio-economic, cultural and Asesoría Legal Gratuita IBRD / 89750 geographic barriers to access Post Direct Selection Direct 9,260.27 9,174.81 Signed 2020-12-03 2020-12-22 2020-12-05 2021-01-12 2020-12-16 2021-02-10 2021-01-15 (ALEGRA) a nivel nacional para to justice for vulnerable el Proyecto de Inversión populations. "Mejoramiento delos Servicios de Asesoría Legal Gratuita (ALEGRA) PE-MINJUS-212427-CS-INDV / Supervisor/a del Componente 1: Optimización y Mejora de Infraestructura, Component 3: Reducing del Proyecto de Inversión socio-economic, cultural and Individual “Mejoramiento de los Servicios IBRD / 89750 geographic barriers to access Post Consultant Open 46,027.40 37,670.60 Signed 2021-01-05 2021-01-05 2021-01-14 2021-01-29 2021-01-17 2021-01-19 2021-03-02 2022-01-19 de Asesoría Legal Gratuita to justice for vulnerable Selection (ALEGRA) para lograr la populations. adecuada Implementación del Expediente Judicial Electrónico (EJE)” con CUI PE-MINJUS-218366-CS-INDV / Elaboración de un Estudio Definitivo del Componente 1 “Mayores Niveles de Component 1: Strengthening Modernización de los Individual the institutionality of the non- Under Sistemas de Gestión” para el IBRD / 89750 Post Consultant Open 10,040.82 0.00 2021-02-15 2021-04-22 2021-02-24 2021-02-27 2021-03-05 2021-05-04 criminal justice Implementation Proyecto “Mejoramiento de los Selection administration system Servicios de la Junta Nacional de Justicia-JNJ, en el marco de la Implementación del Expediente Judic PE-MINJUS-221666-CS-INDV / Elaboración de un Estudio Definitivo del Componente 2 Component 1: Strengthening “Mayor Capacidad de la Individual the institutionality of the non- Under Plataforma Tecnológica” para IBRD / 89750 Post Consultant Open 20,283.29 0.00 2021-03-08 2021-03-23 2021-03-21 2021-03-24 2021-03-30 2021-06-28 criminal justice Implementation el Proyecto “Mejoramiento de Selection administration system los Servicios de la JNJ, en el marco de la Implementación del EJE de CUI 2412541 Page 2 PROJET D’APPUI REGIONAL A L’INITIATIVE POUR L’IRRIGATION AU SAHEL (PARIIS) PPA2 Plan de Passation de Marchés (PPM) sur 11 mois Version du 11 octobre 2017 I. Généralités 1.1. Information générale sur le projet - Pays: Régional (Burkina Faso, Mali, Mauritanie, Niger Sénégal, Tchad) - Emprunteur (niveau régional) : CILSS - Nom du Projet : Projet d’Appui Régional à l’Initiative pour l’Irrigation au Sahel (PARIIS- SIIP) - Numéro du Projet : P154482 (PPA-CILSS N° V 160) - Montant du Don sollicité : 20 millions dollars américains - Montant des fonds rétrocédés par les pays : - Unité de Gestion du Projet : Comité permanent Inter-Etats de Lutte contre la Sécheresse dans le Sahel (CILSS) 1.2. Date d’approbation du plan de passation de marchés : Original : 25 août 2017 1.3 Date de publication de l’avis général de passation de marchés : 1er novembre 2017 1.4 Période couverte par ce Plan de Passation des Marchés : Octobre 2017 à juillet 2018 1.5 Risque global lié à la passation des marchés : Substantiel II. Fournitures, travaux et services autre que les services de consultants. 2.1 Seuils d’Examen Préalable : Décisions de Passation des Marchés sujettes à l’Examen Préalable de la Banque comme énoncé dans l’Annexe 1 des Directives : « Passation des marchés de fournitures, travaux et services assimilés » Seuil Méthode de d’utilisation de Seuil d’examen Nature du passation de la méthode de préalable de marché marchés passation en l’IDA en USD USD 1 Travaux (y ≥ Tous les contrats AOI compris clés en 5.000.000 de 10.000.000 main, Fourniture AON < 5.000.000 $EU et plus, et montage Consultation de indépendamment < 200.000 d’installations et Fournisseurs du mode de PPP) Entente Directe Pas de seuil passation ≥ Tous les contrats Fournitures, AOI 1.000.000 de 2.000.000 Systèmes AON < 1.000.000 $EU et plus, Informatiques et Consultation de indépendamment Services autres < 100.000 Fournisseurs du mode de que Services de passation Consultants Entente Directe Pas de seuil 2.2 Préqualification : Ajouter Non applicable, si pas de préqualification prévue, si non ajouter la liste de contrats pour lesquels la préqualification est prévue. 2.3 Procédures proposées pour les composantes CDD (selon le paragraphe. 3.17 des Directives : [se référer au document approprié d'exécution de projet de CDD approuvé par la Banque] 2.4 Référence au Manuel de Procédures du Projet (MPP) : Manuel du CILSS 2.5 Arrangements spéciaux de passation des marchés: Non applicable 2.6 Allotissement de travaux, fournitures et services autres que services de consultants avec méthodes et calendrier 2 1. Travaux 1 2 3 4 5 6 7 8 Ref. Description* Montant Méthode de Examen Date prévue Date prévue Commentaires No. estimé sélection Préalable ou pour pour ($.US) revue à l’ouverture l’attribution postériori par la des offres Banque Total Travaux 2. Fournitures et services autres que les services de consultants 1 2 3 4 5 6 7 8 9 N° Description du Marché Montant Méthode de Pré ou Examen Date Date Commentaires Réf estimé passation du post préalable prévue prévue ($.US) marché qualifica ou à pour pour tion posteriori l’ouverture l’attributio des offres n (au plus tard) 1. Acquisition des équipements de 17000 AON Post Posteriori Octobre Décembre bureaux, informatiques, 2017 2017 consommables 2. Traduction et édition des Documents 2700 CF Post Posteriori Octobre Décembre générés 2017 2017 Total Fournitures 19700,00 USD 3 III- Sélection de Consultants 3.1. Seuil d’examen préalable Les contrats qui seront soumis à l'examen préalable de la Banque conformément aux dispositions de l'Annexe 1 des Directives de Sélection et Emploi de Consultants de janvier 2011 : Contrats soumis à Services de Méthode de passation Valeur seuil du marché examen consultants de marchés $EU préalable de l’IDA SBQC; SBQ; SCM; SCBD, Pas de seuil Tout contrat de SBQC <300.000 1.000.000 $EU ou a) Consultant plus, s indépendamment Firmes Entente directe Pas de seuil du mode de sélection Tout contrat de Consultant individuel pas de seuil 300.000 $ EU ou plus, b) Consulta indépendamment nts du mode de Individuels Entente directe Pas de seuil sélection (comparaison de CV ou Entente directe) Tous les TDRs, quel que soit la valeur du contrat, sont soumis à examen préalable. Le justificatif de toute entente directe dont le cout estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM. 3.2. Liste restreinte composée entièrement de Consultants Nationaux : Liste restreinte de consultants pour prestations de services, d’un coût estimatif inférieur à 200 000$ US ou équivalent par contrat (ce seuil est de 400.000USD pour les Etudes architecturales et le suivi des travaux), peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants 4 Arrangements de sélection particuliers: Non applicable Services de consultants avec méthodes et dates de sélection 1 2 3 4 5 6 7 8 Re Description* Montant Méthode Examen Date Date Commentaires f. estimé de Préalable ou prévue prévue No ($.US) sélection revue à postériori pour pour . par la Banque l’ouverture l’attributio des offres n 3. conception et de 8 000 Consultant Post Octobre Décembre réalisation d’un site individuel 2017 2017 WEB PARIIS incluant des outils collaboratifs 4. Réalisation de la 40 000 Consultant Post Octobre Novembre charte et du Manuel individuel 2017 2017 d’audit 5. Recrutement expert 38 000 Consultant Post Octobre Novembre appui audit individuel 2017 2017 6. PS Appui 95 000 SBQ Post Octobre Octobre - Suivi&Evaluation 2017 2017 7. Expert Genre 5 500 Consultant Post Octobre Novembre individuel 2017 2017 8. Coordonnateur 65 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1-continuité régional directe 2017 2017 avec la préparation du projet- le CILSS enverra une lettre de confirmation de performance – 8 mois sur ce PPA2 9. Assistance en 12 500 Entente Post Octobre Octobre L’expert initialement sur le PPA1 sera Passation des directe 2017 2017 sollicité pour des prestations ponctuelles à la Marché demande. Sa disponibilité est confirmée. 10. Assistant Comptable 14 700 Consultant Post Octobre Septembre individuel 2017 2017 11. Expertise groupe de 4300 Consultant Post Octobre Décembre travail individuel 2017 2017 5 12. Assistante 19 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1-continuité administrative et Directe 2017 2017 avec la préparation du projet- le CILSS enverra une secrétariat du Projet lettre de confirmation de performance – 5 mois sur ce PPA2 13. Expert 17 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 par Communication du Directe 2017 2017 recrutement compétitif- Continuité avec la Projet préparation du projet- 4 mois sur ce PPA 2 14. Expert Suivi 21 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 par Evaluation du Projet Directe 2017 2017 recrutement compétitif- Continuité avec la préparation du projet- 5 mois sur ce PPA2 15. Assistant technique 26 800 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 par Expert GR/Irrigation Directe 2017 2017 recrutement compétitif- Continuité avec la basé au SE CILSS préparation du projet- 5 mois sur ce PPA2 Staff 16. Expert système 20 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 en charge de d’information basé à Directe 2017 2017 l‘élaboration de l ‘annexe manuel et stratégie du AGRHYMET Système d’information du Manuel de mise en Œuvre du projet - continuité avec la préparation du projet pour la finalisation de ce manuel - le CILSS enverra une lettre de confirmation de performance –3 mois sur ce PPA2 17. Expert formation 9 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 en charge de basé à AGRHYMET Directe 2017 2017 l‘élaboration de l ‘annexe manuel et stratégie de formation du Manuel de mise en Œuvre du projet - continuité avec la préparation du projet pour la finalisation de ce manuel - le CILSS enverra une lettre de confirmation de performance –1 mois et demi mois sur ce PPA2 18. Expert en gestion de 17 000 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 en charge de connaissance basé à Directe 2017 2017 l‘élaboration de l ‘annexe manuel et stratégie de l’INSAH gestion de connaissance du Manuel de mise en Œuvre du projet - continuité avec la préparation du projet pour la finalisation de ce manuel - le CILSS enverra une lettre de confirmation de performance –3 mois sur ce PPA2 19. Expert en Recherche 11 300 Entente Post Octobre Octobre Staff URC déjà sur place sur le PPA 1 en charge de Appliquée basé Directe 2017 2017 l‘élaboration de l ‘annexe manuel et stratégie de recherche appliquée du Manuel de mise en Œuvre du projet - continuité avec la préparation du projet pour la finalisation de ce manuel - le 6 CILSS enverra une lettre de confirmation de performance –2 mois sur ce PPA2 20. Stagiaire Irrigation 400 Consultant Post Octobre Octobre individuel 2017 2017 21. Stagiaire 400 Consultant Post Octobre Octobre Communication individuel 2017 2017 Total Consultants 424900 ,00 USD 7 PROCUREMENT Western Africa : Sahel Irrigation Initiative Support Project PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-03-28 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154482 GPN Date: Project Name: Sahel Irrigation Initiative Support Project Loan / Credit No: IDA / D2520, IDA / D2550 Sahel Irrigation Initiative Support Proj Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MR-PARIIS - MR-69044-CW- RFQ / Travaux Component A: Modernizing Request for Single Stage - One 2018-09- d'aménagement du périmètre IDA / D2520 Post Limited 23,910.00 0.00 Canceled 2018-07-23 2018-08-08 the institutional framework Quotations Envelope 07 & Le réseau d'irrigation (clôture, aménagement du site) MR-PARIIS-MR-70045-CW- RFQ / Construction du hangar Component A: Modernizing Request for Single Stage - One 2018-09- IDA / D2520 Post Limited 4,220.00 0.00 Canceled 2018-07-23 2018-08-10 et magasin the institutional framework Quotations Envelope 09 de stockage MR-PARIISMR-93661-CW- RFB / Travaux de Réhabilitation de 3 PIV dans la Component A: Modernizing Single Stage - One 2020-05- IDA / D2520 Post Request for Bids Open - National 542,800.00 507,583.82 Signed 2019-08-02 2019-04-03 2019-08-07 2019-09-06 2019-05-13 2019-10-21 2019-07-17 2019-11-19 2019-10-07 Wilaya du Trarza/Communes the institutional framework Envelope 17 de Lexeiba et Teikane (Jder Boukoum, Houbeire et El Ech) MR-PARIISMR-93664-CW- Pending RFB / Travaux de Mise en Component A: Modernizing Single Stage - One 2019-08- IDA / D2520 Post Request for Bids Open - National 285,000.00 0.00 Implementat 2019-03-08 2019-03-13 2019-04-12 2019-05-12 2019-06-02 place de 4 sites pilotes (Adrar the institutional framework Envelope 01 ion et Tagant) MR-PARIISMR-93706-CW- Component A: Modernizing Single Stage - One 2020-06- RFB / Travaux Aménagement IDA / D2520 Post Request for Bids Open - National 523,000.00 391,056.44 Signed 2019-06-02 2019-04-11 2019-06-07 2019-07-07 2019-05-20 2019-08-06 2019-08-16 2019-09-10 2019-10-09 the institutional framework Envelope 06 de 400 ha de CES/DRS MR-PARIISMR-93717-CW- RFB / Travaux de Création de 3 PIV dans la Wilaya du Component A: Modernizing Single Stage - One 2020-06- IDA / D2520 Post Request for Bids Open - National 500,000.00 378,853.46 Signed 2019-08-29 2019-05-09 2019-09-03 2019-10-03 2019-06-18 2019-11-02 2019-07-25 2019-12-07 2019-10-17 Trarza/Communes de Tekane the institutional framework Envelope 04 et Rosso (Medine Mazouz, Rghewatt et Begnoug) MR-PARIISMR-93723-CW- RFB / Travaux de Component A: Modernizing Single Stage - One 2020-02- IDA / D2520 Post Request for Bids Open - National 450,000.00 424,233.99 Signed 2019-06-26 2019-04-16 2019-07-01 2019-07-31 2019-05-21 2019-08-30 2019-07-17 2019-10-04 2019-10-22 Réhabilitation de 4 barrages the institutional framework Envelope 01 de 400 ha MR-PARIISMR-93643-CW- RFB / Travaux de Mise en Component A: Modernizing Single Stage - One 2019-07- IDA / D2520 Post Request for Bids Open - National 285,000.00 234,088.14 Signed 2019-02-05 2019-04-18 2019-02-10 2019-03-12 2019-05-27 2019-04-11 2019-07-25 2019-05-16 2019-10-21 place de 4 sites pilotes the institutional framework Envelope 15 (Trarza et Brakna) MR-PARIISMR-93642-CW- RFB / Travaux de Création de 3 PIV au niveau de la Component A: Modernizing Single Stage - One 2020-03- IDA / D2520 Post Request for Bids Open - National 505,000.00 412,874.18 Signed 2019-07-12 2019-04-03 2019-07-17 2019-08-16 2019-05-13 2019-09-15 2019-07-17 2019-10-20 2019-10-09 Commune de Bogué (Wilaya the institutional framework Envelope 28 du Brakna : Bassine, Tilla et Ghods2 tejemoue) MR-PARIISMR-93646-CW- RFB / Travaux de Création de Component A: Modernizing Single Stage - One 2020-05- 3 PIV à M'Bagne et Bababé IDA / D2520 Post Request for Bids Open - National 490,000.00 264,717.28 Signed 2019-07-31 2019-05-09 2019-08-05 2019-09-04 2019-06-18 2019-10-04 2019-07-25 2019-11-08 2019-10-15 the institutional framework Envelope 06 (Daghveg , Dioul déwalo et Naim ) MR-PARIISMR-93655-CW- RFB / Travaux de Création de 3 PIV dans les localités de Component A: Modernizing Single Stage - One 2020-03- IDA / D2520 Post Request for Bids Open - National 497,000.00 376,026.42 Signed 2019-06-05 2019-04-15 2019-06-10 2019-07-10 2019-05-13 2019-08-24 2019-07-30 2019-09-28 2019-09-23 Aéré Mbare et the institutional framework Envelope 26 M'bagne(Benkhaldoune1, Benkhaldoune2 et Winding) MR-PARIISMR-93660-CW- RFB / Travaux de Création de 3 PIV dans la Moukgataa de Component A: Modernizing Single Stage - One 2020-05- IDA / D2520 Post Request for Bids Open - National 485,700.00 330,891.78 Signed 2019-08-27 2019-05-09 2019-09-01 2019-10-07 2019-10-01 2019-06-18 2019-11-15 2019-07-25 2019-11-29 2019-10-09 Rkiz/ Commune de Lexeiba the institutional framework Envelope 27 (Oulad Mijen, Diawlé et Bezoul 1) MR-PARIISMR-93665-CW- RFB / Travaux de Création/Aménagement de 3 Component A: Modernizing Single Stage - One 2020-05- PIV dans la Wilaya du IDA / D2520 Post Request for Bids Open - National 492,800.00 314,269.75 Signed 2019-07-17 2019-04-15 2019-07-22 2019-08-21 2019-05-23 2019-10-05 2019-08-12 2019-11-09 2019-10-22 the institutional framework Envelope 07 Trarza/Commune de Lexeiba (Bezoul 2, Dioundou et Moissa) MR-PARIISMR-93647-CW- RFB / Travaux de Mise à Component A: Modernizing Single Stage - One 2019-08- IDA / D2520 Post Request for Bids Open - National 240,000.00 0.00 Canceled 2019-02-06 2019-10-07 2019-02-11 2019-03-13 2019-04-12 2019-05-17 l'échelle de la solution VISA the institutional framework Envelope 15 pour 120 ha MR-PARIISMR-147493-CW- Component B: Financing Pending RFB / Travaux de mise à Single Stage - One 2020-11- IDA / D2520 irrigation investment Post Request for Bids Open - National 515,000.00 0.00 Implementat 2020-02-13 2020-02-25 2020-04-15 2020-05-30 2020-07-04 l’échelle de la Solution VISA Envelope 01 solutions ion pour 120 ha MR-PARIISMR-169901-CW- Component B: Financing RFB / Réaliser les travaux de Single Stage - One 2021-03- IDA / D2520 irrigation investment Post Request for Bids Open - National 520,000.00 393,272.87 Signed 2020-07-15 2020-07-02 2020-07-22 2020-09-05 2020-08-14 2020-10-20 2020-08-27 2020-11-24 2020-10-26 réhabilitation des deux Envelope 24 solutions barrages au Brakna Page 1 MR-PARIISMR-169934-CW- Component B: Financing RFB / Réaliser les travaux de Single Stage - One 2021-03- IDA / D2520 irrigation investment Post Request for Bids Open - National 485,720.00 291,712.08 Signed 2020-06-30 2020-07-10 2020-07-30 2020-08-29 2020-08-14 2020-09-28 2020-08-27 2020-11-02 2020-11-09 construction des seuils en Envelope 02 solutions gabion dans l'Adrar MR-PARIISMR-169942-CW- Component B: Financing Pending RFB / Réalisations de quatre Single Stage - One 2021-02- IDA / D2520 irrigation investment Post Request for Bids Open - National 290,000.00 0.00 Implementat 2020-08-10 2020-08-25 2020-09-24 2020-11-08 2020-12-13 nouveau sites pilotes dans les Envelope 11 solutions ion nouvelles ZIP pour 40 ha MR-PARIISMR-170907-CW- RFQ / Offset croisé Component B: Financing Request for Single Stage - One 2020-06- (Préparation de Sol) pour la IDA / D2520 irrigation investment Post Limited 42,000.00 38,495.16 Signed 2020-05-12 2020-05-28 2020-06-09 2020-06-10 Quotations Envelope 12 mise en valeur de 497 Ha au solutions Brakna et Trarza MR-PARIISMR-169939-CW- RFB / Conception et mise en œuvre de solutions Component B: Financing Single Stage - One 2020-12- d'irrigation VISA de Type 2 et IDA / D2520 irrigation investment Post Request for Bids Open - National 214,286.00 189,074.59 Signed 2020-05-29 2019-12-16 2020-06-28 2020-07-28 2020-01-20 2020-09-11 2020-02-18 2020-10-16 2020-04-20 Envelope 15 3 pour 100 ha ( réalisation de solutions périmètres VISA individuels et collectifs) MR-PARIISMR-171017-CW- RFQ / Réalisation de travaux Component B: Financing Pending Request for Single Stage - One 2020-11- du sol au niveau des cuvettes IDA / D2520 irrigation investment Post Limited 18,300.00 0.00 Implementat 2020-09-08 2020-10-20 Quotations Envelope 19 des barrages (Tachott Khadra solutions ion et Tegunent) (320ha) MR-PARIISMR-201849-CW- RFB / TRAVAUX D’AMENAGEMENT DES Component B: Financing PERIMETRES IRRIGUES Single Stage - One 2021-05- IDA / D2520 irrigation investment Post Request for Bids Open - National 542,000.00 444,428.19 Signed 2020-11-12 2020-12-01 2020-11-17 2020-12-17 2021-01-11 2021-01-01 2021-02-24 2021-01-22 2021-05-24 COOPERATIFS DE DJEOL1, Envelope 22 solutions DJEOL 2, DJEOL3, DJEOL4 ET KAGNADA DANS LA WILAYA DU GORGOL (100HA) MR-PARIISMR-201850-CW- RFB / TRAVAUX D’AMENAGEMENT DES Component B: Financing PERIMETRES IRRIGUES Single Stage - One 2021-05- IDA / D2520 irrigation investment Post Request for Bids Open - National 542,000.00 39,527.16 Signed 2020-11-19 2020-12-01 2020-11-24 2020-12-24 2021-01-05 2021-01-08 2021-02-22 2021-01-29 2021-05-24 COOPERATIFS DE SOLLOU, Envelope 29 solutions GOURAYE ET WOUMPOU DANS LA WILAYA DU GUIDIMAKHA (100HA) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-PARIIS - MR-62266-GO- Component A: Modernizing Request for Single Stage - One RFQ / Acquisition IDA / D2520 Post Limited 40,000.00 30,860.27 Completed 2018-06-27 2018-10-25 2018-08-24 2018-11-12 2018-09-23 2018-11-15 the institutional framework Quotations Envelope d'Equipements MR-PARIIS-MR-70050-GO- RFQ / Acquisition, installation Component A: Modernizing Request for Single Stage - One IDA / D2520 Post Limited 28,000.00 26,180.46 Signed 2018-07-27 2019-09-10 2018-08-11 2019-09-20 2018-08-26 et abri pour groupe the institutional framework Quotations Envelope électrogène MR-PARIIS - MR-79875-GO- RFQ / Dotation de 4 PMA et Component A: Modernizing Request for Single Stage - One du GNGC en mobiliers de IDA / D2520 Post Limited 21,500.00 19,132.05 Completed 2018-11-05 2018-10-29 2018-12-31 2018-11-15 2019-01-15 2018-11-26 the institutional framework Quotations Envelope bureaux, équipements informatiques et bureautiques MR-PARIIS - MR-54055-GO- Component A: Modernizing Request for Single Stage - One RFQ / Acquisitions IDA / D2520 Post Limited 25,000.00 0.00 Canceled 2018-03-27 2018-05-22 2018-11-18 the institutional framework Quotations Envelope climatiseurs et frigos MR-PARIIS - MR-54829-GO- Component A: Modernizing Request for Single Stage - One RFQ / Acquisition Vehicule IDA / D2520 Post Limited 30,000.00 0.00 Canceled 2017-05-09 2017-07-04 2017-07-07 the institutional framework Quotations Envelope Tout terrain MR-PARIIS - MR-53849-GO- RFQ / Achat mobilier de Component A: Modernizing Request for Single Stage - One bureau siège UCP (bureaux+ IDA / D2520 Post Limited 40,000.00 0.00 Canceled 2018-03-27 2018-04-20 2018-04-21 the institutional framework Quotations Envelope équipements (Ridos,Tapis...) + une grande salle de réunion MR-PARIIS - MR-54820-GO- Component A: Modernizing Request for Single Stage - One RFQ / Acquisition unités IDA / D2520 Post Limited 4,705.00 0.00 Canceled 2017-03-25 2017-05-20 2017-11-16 the institutional framework Quotations Envelope informatiques complètes MR-PARIISMR-93626-GO- RFQ / Equipement en mobilier Component A: Modernizing Request for Single Stage - One IDA / D2520 Post Limited 37,000.00 34,598.27 Signed 2019-02-03 2019-02-06 2019-02-24 2019-02-20 2019-03-03 de bureau et informatique the institutional framework Quotations Envelope pour les Assistants Régionaux MR-PARIISMR-93630-GO- RFQ / Dotation en équipement Component A: Modernizing Request for Single Stage - One IDA / D2520 Post Limited 11,000.00 9,630.67 Signed 2019-02-15 2019-07-01 2019-03-18 2019-07-11 2019-03-25 et Materiel Technqiue de la the institutional framework Quotations Envelope Cellule Foncière du MDR MR-PARIISMR-93632-GO- Pending Component A: Modernizing Request for Single Stage - One RFQ / Mise en place des outils IDA / D2520 Post Limited 10,000.00 0.00 Implementati 2019-01-23 2019-02-12 2019-02-27 the institutional framework Quotations Envelope de communication on MR-PARIISMR-93639-GO- RFQ / Renforcement des Pending capacités des organes locaux Component A: Modernizing Request for Single Stage - One IDA / D2520 Post Limited 30,000.00 0.00 Implementati 2019-03-27 2019-04-24 2019-05-09 de gestion des Terres et de the institutional framework Quotations Envelope on l'Eau : Dotations matérielles et appui technique Page 2 MR-PARIISMR-93658-GO- RFQ / Dotation en équipement et Materiel pour la Direction Component A: Modernizing Request for Single Stage - One IDA / D2520 Post Limited 5,000.00 4,768.58 Signed 2019-05-14 2019-08-08 2019-06-11 2019-08-26 2019-06-21 du Contrôle Environnemental the institutional framework Quotations Envelope et Directions Régionales /MEDD Pending MR-PARIISMR-93702-GO- Component A: Modernizing Request for Single Stage - One IDA / D2520 Post Limited 14,000.00 0.00 Implementati 2019-04-09 2019-05-07 2019-05-22 RFQ / Fourniture de bureaux the institutional framework Quotations Envelope on MR-PARIIS - MR-62471-GO- UN / Acquisition de 5 Component A: Modernizing UN Agencies véhicules 4*4 : 1 véhicule IDA / D2520 Prior Direct 177,000.00 0.00 Canceled 2018-06-12 2018-06-27 2018-08-01 2018-09-30 the institutional framework (Direct) station wagon et 4 véhicules doubles cabines MR-PARIIS - MR-53871-GO- RFQ / Acquisition matériels informatiques (unités Pending Component A: Modernizing Request for Single Stage - One complètes, un IDA / D2520 Post Limited 30,000.00 0.00 Implementati 2018-03-27 2018-05-22 2018-11-18 the institutional framework Quotations Envelope grandphotocopieuret un on grand scanner,projecteurs et Caméras de surveillances) MR-PARIISMR-99685-GO- Under Component A: Modernizing Request for Single Stage - One RFQ / Acquisition de GFU IDA / D2520 Post Limited 6,900.00 0.00 Implementati 2019-03-02 2019-03-28 2019-04-12 the institutional framework Quotations Envelope pour personnel du PARIIS-MR on MR-PARIISMR-122626-GO- Component A: Modernizing Single Stage - One RFB / acquisitions de IDA / D2520 Post Request for Bids Open - National 465,000.00 339,003.76 Signed 2019-11-04 2019-10-23 2019-11-09 2019-12-09 2019-12-30 2019-12-24 2020-01-03 2020-01-28 2020-03-05 2020-03-28 the institutional framework Envelope motopompes MR-PARIISMR-122636-GO- RFB / Acquisition de 2 Component A: Modernizing Single Stage - One IDA / D2520 Post Request for Bids Open - National 105,000.00 79,235.36 Signed 2019-08-12 2019-11-13 2019-08-17 2019-08-20 2019-12-16 2019-09-04 2019-12-18 2019-10-09 2020-01-20 2019-12-08 véhicules 4x4 et un véhicule the institutional framework Envelope leger MR-PARIISMR-170912-GO- RFQ / Fourniture d'intrants et Component B: Financing Under Request for Single Stage - One Semences pour la mise en IDA / D2520 irrigation investment Post Limited 35,000.00 0.00 Implementati 2020-05-28 2020-07-02 2020-08-01 Quotations Envelope valeur de 497 Ha au Brakna et solutions on Trarza MR-PARIISMR-170932-GO- RFQ / Apporter un appui Component C: Knowledge Pending Request for Single Stage - One matériel aux organes de IDA / D2520 management and Post Limited 42,000.00 0.00 Implementati 2020-05-18 2020-06-29 2020-07-29 Quotations Envelope gestion des connaissances 5 coordination on PMA MR-PARIISMR-170934-GO- RFQ / Apporter un appui Component C: Knowledge Pending Request for Single Stage - One matériel aux organes de IDA / D2520 management and Post Limited 18,000.00 0.00 Implementati 2020-05-25 2020-07-20 2020-08-19 Quotations Envelope gestion des connaissances coordination on GPCN MR-PARIISMR-170937-GO- RFQ / Appui aux Assistants Component B: Financing régionaux et d’un Assistant Request for Single Stage - One IDA / D2520 irrigation investment Post Limited 35,000.00 34,883.72 Signed 2020-07-20 2020-11-26 2020-09-14 2020-12-10 2020-10-14 au RPM et leur dotation en Quotations Envelope solutions équipements et mobiliers de bureaux Component C: Knowledge Pending MR-PARIISMR-170959-GO- Request for IDA / D2520 management and Post 17,500.00 0.00 Implementati 2020-05-28 2020-07-02 2020-08-01 RFQ / Fourniture de bureaux Quotations coordination on MR-PARIISMR-171003-GO- RFQ / Acquisition des intrants Component C: Knowledge (semences, herbicides et Request for Single Stage - One IDA / D2520 management and Post Limited 31,300.00 30,880.40 Signed 2020-10-08 2020-09-11 2020-11-19 2020-10-05 2020-12-19 engrais) pour la mise en Quotations Envelope coordination valeur de deux barrages (Tachott Khadra et Tegunent) MR-PARIISMR-171010-GO- RFQ / Acquisition petit matériel agricole et petit Component C: Knowledge Pending Request for matériel moisson pour la mise IDA / D2520 management and Post 28,600.00 0.00 Implementati 2020-09-08 2020-10-22 2020-11-21 Quotations en valeur & la récolte de coordination on cuvettes des barrages (Tachott Khadra et Tegunent) MR-PARIISMR-171012-GO- RFQ / Acquisition équipement irrigation pour assurer Component C: Knowledge Request for Single Stage - One l’irrigation complémentaires IDA / D2520 management and Post Limited 35,800.00 36,894.82 Signed 2020-09-06 2020-12-15 2020-10-18 2021-01-04 2020-11-17 Quotations Envelope au niveau des cuvettes des coordination barrages (Tachott Khadra et Tegunent) MR-PARIISMR-169947-GO- DIR / Fourniture des engrais Component B: Financing Pending & Herbicide pour la mise en IDA / D2520 irrigation investment Post Direct Selection Direct 70,000.00 0.00 Implementati 2020-05-25 2020-06-01 2020-07-07 2020-08-06 valeur de 497 ha au niveau de solutions on la wilaya du Trarza et Brakna MR-PARIISMR-201852-GO- Component B: Financing RFQ / Acquisition des intrants Request for Single Stage - One IDA / D2520 irrigation investment Post Limited 20,000.00 19,252.77 Signed 2020-11-21 2020-11-16 2020-12-08 2020-12-02 2020-12-23 et petit matériel agricole pour Quotations Envelope solutions les 4 sites pilotes NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 MR-PARIIS - MR-54056-NC- DIR / Acquisition du Logiciel TOMPRO décidée par ED au Component A: Modernizing IDA / D2520 Post Direct Selection Direct 25,000.00 15,945.21 Completed 2018-04-08 2018-05-14 2018-04-13 2018-05-15 2018-05-18 2018-06-07 2019-05-18 2018-08-09 niveau régional pour the institutional framework l'ensemble des pays (CILSS) avec TEMPRO MR-PARIIS - MR-54085-NC- Component A: Modernizing DIR / Convention avec IDA / D2520 Prior Direct Selection Direct 105,000.00 0.00 Canceled 2018-04-04 2018-04-09 2018-05-14 2018-11-10 the institutional framework CNRADA pour sites pilotes MR-PARIIS - MR-54078-NC- Component A: Modernizing DIR / Actualisation situation IDA / D2520 Prior Direct Selection Direct 8,000.00 0.00 Canceled 2018-03-28 2018-04-02 2018-05-07 2018-11-03 the institutional framework de référence MR-PARIISMR-170985-NC- Component C: Knowledge Pending DIR / Assistance pour IDA / D2520 management and Post Direct Selection 4,571.00 0.00 Implementati 2020-04-30 2020-05-05 2020-05-10 2020-06-10 l’exploitation du Tom 2 Pro coordination on MR-PARIISMR-170990-NC- Component C: Knowledge Request for Single Stage - One RFQ / Moisson 300 ha au IDA / D2520 management and Post Limited 41,430.00 13,831.26 Signed 2020-09-08 2020-11-13 2020-10-13 2020-12-09 2020-11-12 Quotations Envelope niveau de la wilaya du Trarza coordination MR-PARIISMR-171002-NC- Component C: Knowledge Pending Request for Single Stage - One RFQ / Moisson 200 ha au IDA / D2520 management and Post Limited 40,000.00 0.00 Implementati 2020-09-06 2020-10-11 2020-11-10 Quotations Envelope niveau de la wilaya du Brakna coordination on MR-PARIISMR-170950-GO- RFQ / Produire des supports Component C: Knowledge Pending et gadgets promotionnels Request for Single Stage - One IDA / D2520 management and Post Limited 20,000.00 0.00 Implementati 2020-06-05 2020-06-27 2020-07-12 (calendriers, stylos, porte- Quotations Envelope coordination on documents, Agendas, T- Shirts, casquettes ) MR-PARIISMR-170955-NC- Component C: Knowledge Request for Single Stage - One RFQ / Réaliser un film IDA / D2520 management and Post Limited 20,000.00 19,363.76 Signed 2020-06-27 2020-10-09 2020-08-16 2020-11-04 2020-09-15 Quotations Envelope documentaire sur le PARIIS coordination MR-PARIISMR-171014-NC- RFQ / Conditionnement de Component B: Financing Pending production & Transports de Request for Single Stage - One IDA / D2520 irrigation investment Post Limited 5,500.00 0.00 Implementati 2020-09-08 2020-10-21 2020-11-20 produit de la récolte de Quotations Envelope solutions on culture derrière les barrages (Tachott Khadra et Tegunent) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-PARIIS - MR-62597-CS- Consultant CQS / Etude pour la Component A: Modernizing IDA / D2520 Post Qualification Open - National 80,000.00 71,232.88 Signed 2018-07-12 2018-09-04 2018-08-02 2018-09-27 2018-08-16 2018-10-27 2018-09-03 2018-12-02 2018-09-13 2019-04-01 réhabilitation de périmètres the institutional framework Selection coopératifs pour 300 ha. MR-PARIIS - MR-62599-CS- Component A: Modernizing Least Cost Under LCS / Audits des états IDA / D2520 Post Open - National 11,500.00 0.00 2018-05-15 2018-11-15 2018-12-09 2019-01-06 2019-02-05 2019-03-12 2019-04-16 2020-04-10 the institutional framework Selection Implementation financiers MR-PARIIS - MR-62594-CS- Consultant Component A: Modernizing INDV / Assistance Technique IDA / D2520 Post Qualification Open - National 40,000.00 38,328.11 Completed 2018-06-07 2018-08-20 2018-10-04 2018-11-17 2018-09-20 2018-12-17 2018-10-01 2019-01-21 2018-10-01 2019-02-26 2018-12-17 the institutional framework à la DAA. Selection MR-PARIIS - MR-62596-CS- Consultant INDV / Etude de faisabilité Component A: Modernizing Under IDA / D2520 Post Qualification Open - National 42,000.00 0.00 2018-06-07 2019-06-24 2018-08-30 2019-10-07 2018-10-13 2018-11-12 2018-12-17 2019-01-16 d'un dispositif pilote d'appui- the institutional framework Implementation Selection conseil aux irrigants MR-PARIIS - MR-62507-CS- Consultant INDV / Etude pour la mise à Component A: Modernizing IDA / D2520 Post Qualification Open - National 30,000.00 11,232.88 Signed 2018-06-07 2018-08-20 2018-10-04 2018-11-17 2018-09-20 2018-12-17 2018-10-01 2019-01-21 2018-10-01 2020-01-16 l'échelle de la solution VISA the institutional framework Selection pour 300 ha MR-PARIIS - MR-62508-CS- Consultant CQS / Etude pour Component A: Modernizing IDA / D2520 Post Qualification Open - National 95,000.00 84,931.51 Signed 2018-07-27 2018-07-25 2018-07-29 2018-09-18 2018-08-16 2018-10-18 2018-09-03 2018-11-23 2018-09-03 2019-01-22 l'aménagement de périmètres the institutional framework Selection coopératifs pour 400 ha. MR-PARIIS - MR-62509-CS- Consultant CQS / Etude pour la Component A: Modernizing IDA / D2520 Post Qualification Open - National 36,000.00 35,616.44 Signed 2018-07-05 2018-08-20 2018-07-26 2018-09-13 2018-09-21 2018-10-13 2018-10-01 2018-11-18 2018-10-01 2019-01-17 réhabilitation de 4 barrages the institutional framework Selection en ZIP hors-fleuve MR-PARIIS - MR-62510-CS- Consultant CQS / Etude pour Component A: Modernizing IDA / D2520 Post Qualification Open - National 37,500.00 35,068.49 Signed 2018-06-14 2018-08-20 2018-07-05 2018-08-22 2018-09-21 2018-09-21 2018-10-01 2018-10-26 2018-10-01 2018-12-25 l'aménagement de 400 ha the institutional framework Selection CES/DRS. MR-PARIIS - MR-79847-CS- CQS / Recrutement d'un bureau pour réaliser le Consultant Component A: Modernizing screening et les évaluations IDA / D2520 Post Qualification Open - National 31,000.00 28,520.55 Signed 2018-10-15 2018-11-12 2018-11-05 2018-11-21 2018-12-03 2018-12-01 2018-12-19 2018-12-16 2018-12-19 2019-01-15 the institutional framework environnementales et sociales Selection pour les sites retenus en zone irriguée MR-PARIIS - MR-54070-CS- Component A: Modernizing Least Cost IDA / D2520 Prior Open - National 5,000.00 0.00 Canceled 2018-04-08 2018-04-29 2018-06-12 2018-07-10 2018-08-09 2018-09-13 2018-10-18 2019-04-16 LCS / Audit PPA the institutional framework Selection MR-PARIISMR-93634-CS- CQS / Recrutement d'un Consultant Bureau d'études pour Component A: Modernizing Under IDA / D2520 Post Qualification Open - National 40,000.00 0.00 2019-03-26 2019-04-22 2019-04-16 2019-05-30 2019-06-29 2019-08-03 2020-01-30 l'élaboration des cartes ZIP et the institutional framework Implementation Selection POAS pour les zones hors fleuve Page 4 MR-PARIISMR-93636-CS- CQS / Etude de référence/diagnostic au niveau des zones Consultant d'intervention (Assaba, Component A: Modernizing Under IDA / D2520 Post Qualification Open - National 38,000.00 0.00 2019-06-05 2020-07-25 2019-06-26 2019-07-25 2019-08-01 2019-08-15 2019-09-14 Gorgol, 2 Hodh et the institutional framework Implementation Selection Guidimagha) du Projet pour les trois types de solutions d'irrigation " MR-PARIISMR-93738-CS- QCBS / Suivi & Contrôle des Component A: Modernizing Quality And Cost- Under IDA / D2520 Post Open - National 52,300.00 0.00 2019-06-25 2019-12-20 2019-07-16 2019-08-29 2019-09-26 2019-11-05 2019-12-10 2020-01-21 2020-06-29 Travaux Aménagement de the institutional framework Based Selection Implementation 400 ha de CES/DRS MR-PARIISMR-93736-CS- QCBS / Suivi & Contrôle des Component A: Modernizing Quality And Cost- Under IDA / D2520 Post Open - National 42,000.00 0.00 2019-04-30 2019-10-07 2019-05-05 2019-06-18 2019-07-16 2019-08-25 2019-09-29 2019-11-03 2020-03-02 Travaux de Réhabilitation de 4 the institutional framework Based Selection Implementation barrages de 400 ha PDIAE 02 / Etude de la Consultant situation de référence du Component A: Modernizing Under IDA / D2550 Post Qualification Open - National 25,000.00 0.00 2019-04-18 2019-09-26 2019-04-22 2019-05-07 2019-05-15 2019-05-27 2019-07-17 nouveau projet PDIAE/Zone the institutional framework Implementation Selection Pluviale. MR-PARIISMR-93666-CS- QCBS / Suivi & contrôle des Component A: Modernizing Quality And Cost- Under travaux de Création de 18 PIV IDA / D2520 Post Open - National 351,330.00 0.00 2019-06-27 2019-11-08 2019-07-12 2019-08-25 2019-09-22 2019-10-22 2019-11-26 2019-12-31 2020-06-28 the institutional framework Based Selection Implementation dans la Wilaya du Trarza et celle du Brakna MR-PARIISMR-122610-CS- INDV / Elaboration d'un cadre Consultant Component A: Modernizing Under de gestion environnementale IDA / D2520 Post Qualification Open - National 24,300.00 0.00 2019-07-15 2019-09-26 2019-07-30 2019-08-21 2019-08-28 2019-09-11 2019-10-11 the institutional framework Implementation et sociale (CGES) pour le Selection projet PDIAE/ZP MR-PARIISMR-122625-CS- CQS / recrutement d'une ONG Consultant Component A: Modernizing Under internationale pour appuyer la IDA / D2520 Post Qualification Open - National 200,000.00 0.00 2019-07-22 2020-01-17 2019-08-12 2019-09-25 2019-10-25 2019-11-29 2020-11-23 the institutional framework Implementation SONADER en ingénierie Selection sociale MR-PARIISMR-122627-CS- Consultant CQS / Recrutement d'une ONG Component A: Modernizing Under IDA / D2520 Post Qualification Open - National 40,000.00 0.00 2019-07-15 2020-07-27 2019-08-05 2019-09-18 2019-10-18 2019-11-22 2020-03-21 pour l'Assistance technique the institutional framework Implementation Selection VISA en Zone Trarza-Sud MR-PARIISMR-122628-CS- Consultant CQS / Recrutement d'une ONG Component A: Modernizing Under IDA / D2520 Post Qualification Open - National 40,000.00 0.00 2019-07-15 2020-07-27 2019-08-05 2019-09-18 2019-10-18 2019-11-22 2020-03-21 pour l'Assistance technique the institutional framework Implementation Selection VISA en Zone Trarza-Est MR-PARIISMR-122633-CS- Consultant CQS / Recrutement d'une ONG Component A: Modernizing Under IDA / D2520 Post Qualification Open - National 40,000.00 0.00 2019-07-15 2020-07-27 2019-08-05 2019-09-18 2019-10-18 2019-11-22 2020-03-21 pour l'Assistance technique the institutional framework Implementation Selection VISA en Zone Brakna-Sud MR-PARIISMR-122634-CS- Consultant CQS / Recrutement d'une ONG Component A: Modernizing Under IDA / D2520 Post Qualification Open - National 40,000.00 0.00 2019-07-15 2020-07-27 2019-08-05 2019-09-18 2019-10-18 2019-11-22 2020-03-21 pour l'Assistance technique the institutional framework Implementation Selection VISA en Zone Brakna-Est MR-PARIISMR-122640-CS- Consultant Component A: Modernizing CQS / Recrutement d’OPDL en IDA / D2520 Post Qualification Open - National 30,000.00 35,663.98 Completed 2019-07-15 2019-10-07 2019-08-05 2019-09-03 2019-08-07 2019-10-03 2019-08-30 2019-11-07 2019-08-30 2020-05-05 2020-02-13 the institutional framework Zone Hodh Gharbi Selection MR-PARIISMR-122642-CS- Consultant Component A: Modernizing CQS / Recrutement d’OPDL en IDA / D2520 Post Qualification Open - National 40,000.00 36,003.14 Signed 2019-07-15 2019-10-07 2019-08-05 2019-08-20 2019-08-07 2019-09-19 2019-08-30 2019-10-24 2019-08-30 2020-04-21 the institutional framework Zone Assaba Selection MR-PARIISMR-122643-CS- Consultant Component A: Modernizing CQS / Recrutement d’OPDL en IDA / D2520 Post Qualification Open - National 40,000.00 34,698.68 Signed 2019-07-15 2019-10-07 2019-07-30 2019-08-28 2019-08-07 2019-08-29 2019-08-30 2019-10-03 2019-08-30 2020-03-31 the institutional framework Zone Gorgol Selection MR-PARIISMR-122644-CS- Consultant Component A: Modernizing CQS / Recrutement d’OPDL en IDA / D2520 Post Qualification Open - National 40,000.00 35,742.25 Signed 2019-07-15 2019-10-07 2019-07-30 2019-08-28 2019-08-07 2019-09-12 2019-08-30 2019-10-03 2019-08-30 2020-03-31 the institutional framework Zone Guidimagha Selection MR-PARIISMR-122645-CS- INDV / recrutement d'un Consultant Component A: Modernizing Pending consultant pour IDA / D2520 Post Qualification Open - National 20,000.00 0.00 2019-07-15 2019-07-30 2019-08-28 2019-09-12 2019-10-10 2020-04-07 the institutional framework Implementation l'identification des besoins en Selection formation des acteurs locaux MR-PARIISMR-93627-CS- Component A: Modernizing Quality And Cost- Under QCBS / Recrutement d'OPDL IDA / D2520 Post Open - National 40,000.00 0.00 2019-02-12 2019-10-07 2019-03-05 2019-04-18 2019-05-16 2019-06-15 2019-07-20 2019-08-24 2021-08-13 the institutional framework Based Selection Implementation pour la Zone Hodh Chargui MR-PARIISMR-169739-CS- Consultant CQS / Mobilisation d'une Component A: Modernizing Pending IDA / D2520 Post Qualification Open - National 40,000.00 0.00 2020-05-07 2020-05-22 2020-06-12 2020-06-19 2020-06-29 2020-07-29 ONG pour l’accompagnement the institutional framework Implementation Selection du VISA zone TRARZA OUEST MR-PARIISMR-169741-CS- Consultant CQS / Mobilisation d'Une Component A: Modernizing Pending IDA / D2520 Post Qualification Open - National 40,000.00 0.00 2020-05-06 2020-05-21 2020-06-12 2020-06-19 2020-07-01 2020-07-31 ONG pour l’accompagnement the institutional framework Implementation Selection du VISA zone TRARZA EST MR-PARIISMR-169744-CS- Component B: Financing Consultant CQS / Mobilisation d'Une Pending IDA / D2520 irrigation investment Post Qualification 40,000.00 0.00 2020-09-03 2020-09-18 2020-10-03 2020-10-10 2020-10-24 2021-04-22 ONG pour l’accompagnement Implementation solutions Selection du VISA Zone BRAKNA EST MR-PARIISMR-169756-CS- Component B: Financing Consultant CQS / Réaliser les études IDA / D2520 irrigation investment Post Qualification 40,000.00 0.00 Under Review 2020-05-29 2021-05-01 2020-06-13 2020-07-04 2020-07-11 2020-07-23 2020-08-22 d'aménagement de 200 ha de solutions Selection PIV au Gorgol Page 5 MR-PARIISMR-169886-CS- Component B: Financing Consultant CQS / Réaliser les études Under IDA / D2520 irrigation investment Post Qualification Open - National 24,485.00 0.00 2020-06-08 2020-10-23 2020-06-23 2020-07-14 2020-07-21 2020-08-11 2020-09-10 d'aménagement de 100 ha de Implementation solutions Selection PIV au Guidimakha MR-PARIISMR-169896-CS- CQS / Réaliser les études de Component B: Financing Consultant Under faisabilités de barrages IDA / D2520 irrigation investment Post Qualification Open - National 80,000.00 0.00 2020-05-11 2020-09-28 2020-05-26 2020-06-25 2020-07-02 2020-07-16 2020-09-14 Implementation souterrains au niveau de solutions Selection l'Oued de Tidjikdja MR-PARIISMR-169967-CS- CQS / Mobilisation Consultant Component A: Modernizing Under opérationnelle d'une ONG IDA / D2520 Post Qualification Open - National 40,000.00 0.00 2020-05-07 2020-10-14 2020-05-22 2020-06-13 2020-07-13 2020-08-17 2021-02-13 the institutional framework Implementation pour accompagnement des Selection barrages MR-PARIISMR-170124-CS- CQS / Réaliser des études de Component B: Financing Consultant Under réhabilitation de 2 barrages IDA / D2520 irrigation investment Post Qualification Open - National 42,500.00 0.00 2020-05-04 2020-07-27 2020-05-19 2020-06-04 2021-01-04 2020-06-11 2021-01-11 2020-07-02 2020-08-01 Implementation dans les nouvelles ZIP au solutions Selection Hodh Chargui MR-PARIISMR-170126-CS- CQS / Réaliser des études de Component B: Financing Consultant Under réhabilitation de 2 barrages IDA / D2520 irrigation investment Post Qualification Open - National 42,500.00 0.00 2020-05-08 2020-09-03 2020-05-23 2020-06-22 2020-06-29 2020-07-13 2020-08-12 Implementation dans les nouvelles ZIP en solutions Selection Assaba MR-PARIISMR-170128-CS- CQS / Réaliser des études sur Component B: Financing Consultant Pending un sous bassins versants IDA / D2520 irrigation investment Post Qualification Open - National 40,000.00 0.00 2020-05-07 2020-05-22 2020-06-21 2020-06-28 2020-08-04 2020-09-03 Implementation dans les nouvelles ZIP au solutions Selection Hodh Chargui MR-PARIISMR-170130-CS- CQS / Réaliser des études sur Component B: Financing Consultant Under un sous bassins versants IDA / D2520 irrigation investment Post Qualification Open - National 41,500.00 0.00 2020-05-15 2020-12-14 2020-05-30 2020-06-29 2020-07-06 2020-07-27 2020-09-09 Implementation dans les nouvelles ZIP au solutions Selection Guidimagha MR-PARIISMR-170134-CS- CQS / Réaliser des études sur Component B: Financing Consultant Pending un sous bassins versants IDA / D2520 irrigation investment Post Qualification Open - National 40,800.00 0.00 2020-05-29 2020-06-13 2020-07-27 2020-08-03 2020-08-17 2020-09-16 Implementation dans les nouvelles ZIP au solutions Selection Gorgol MR-PARIISMR-170137-CS- Component B: Financing Consultant CQS / Contrôler les travaux de Under IDA / D2520 irrigation investment Post Qualification Open - National 40,000.00 0.00 2020-05-22 2020-09-11 2020-06-06 2020-07-20 2020-07-27 2020-08-10 2020-09-09 réhabilitation des deux Implementation solutions Selection barrages au Brakna MR-PARIISMR-170143-CS- Component B: Financing Consultant CQS / Contrôle des travaux de IDA / D2520 irrigation investment Post Qualification Open - National 40,000.00 38,867.29 Signed 2020-07-08 2020-12-14 2020-07-29 2020-09-11 2021-03-01 2020-09-18 2021-03-04 2020-10-09 2021-03-05 2021-02-06 réhabilitation des deux solutions Selection barrages en Adrar MR-PARIISMR-170924-CS- Component B: Financing Consultant CQS / Etude d’Evaluation Under IDA / D2520 irrigation investment Post Qualification Open - National 40,000.00 0.00 2020-05-29 2020-09-08 2020-06-13 2020-06-27 2020-07-04 2020-07-26 2020-08-25 d’Impact Environnementale Implementation solutions Selection des sous projets MR-PARIISMR-170125-CS- CQS / Réaliser des études de Component B: Financing Consultant Under réhabilitation de 2 barrages IDA / D2520 irrigation investment Post Qualification Open - National 42,500.00 0.00 2020-06-10 2020-09-17 2020-07-01 2020-07-22 2020-07-29 2020-08-12 2020-09-11 Implementation dans les nouvelles ZIP au solutions Selection Gorgol MR-PARIISMR-207963-CS- QCBS / Assurer le contrôle Component B: Financing des travaux pour des Quality And Cost- Under IDA / D2520 irrigation investment Post Open - National 90,000.00 0.00 2020-12-28 2021-02-09 2021-01-18 2021-06-18 2021-03-03 2021-03-31 2021-04-30 2021-06-04 2021-07-09 2021-11-06 nouveaux aménagements de Based Selection Implementation solutions 200 ha dans les ZIP du Gorgol et du Guidimagha 001/PI/CIAIS/PARIIS- Consultant Component A: Modernizing MR/2021 / recrutement d'un IDA / D2520 Post Qualification Open - National 41,000.00 0.00 Under Review 2021-05-03 2021-05-21 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 the institutional framework OPDL pour El Hodh Charghi Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-PARIIS - MR-54064-CS- INDV / Etude d'analyse des Individual Component A: Modernizing groupes cibles bénéficiaires et IDA / D2520 Post Consultant Open 11,000.00 3,698.63 Completed 2018-03-20 2018-12-03 2018-05-19 2018-06-08 2018-06-09 2018-06-26 2018-07-14 2018-06-26 2019-01-10 2019-01-10 the institutional framework d'identification des zones à Selection couvrir par le projet MR-PARIIS - MR-62473-CS- Individual Component A: Modernizing Under INDV / Appui à IDA / D2520 Post Consultant Limited 6,000.00 4,402.17 2018-05-29 2018-11-27 2018-06-05 2018-11-27 2018-07-10 2018-11-27 2018-08-08 2018-08-11 the institutional framework Implementation l'opérationnalisation de l'UCP Selection MR-PARIIS - MR-62506-CS- Individual Component A: Modernizing INDV / Etude pour la IDA / D2520 Post Consultant Limited 25,000.00 23,287.67 Signed 2018-07-19 2018-08-20 2018-07-26 2018-09-27 2018-07-28 2018-10-01 2018-09-01 2018-10-01 2018-10-01 the institutional framework réalisation de 8 sites pilotes Selection MR-PARIIS - MR-62590-CS- Individual INDV / Mise en place d'un Component A: Modernizing IDA / D2520 Post Consultant Limited 20,000.00 11,369.86 Completed 2018-08-15 2018-10-25 2018-08-22 2018-10-31 2018-08-25 2018-11-13 2018-09-29 2018-11-14 2018-10-29 2019-02-26 plan stratégique de the institutional framework Selection communication MR-PARIIS - MR-62511-CS- Individual Component A: Modernizing INDV / Conception et Mise en IDA / D2520 Post Consultant Limited 8,000.00 7,608.69 Completed 2018-06-07 2018-12-02 2018-06-14 2018-12-03 2018-07-05 2018-12-03 2018-08-09 2018-06-26 2018-08-12 2019-01-03 the institutional framework Place Site WEB Selection Page 6 MR-PARIIS - MR-73596-CS- INDV / Recrutement d'un consultant chargé de Individual l'élaboration d'une stratégie Component A: Modernizing IDA / D2520 Post Consultant Limited 17,000.00 16,301.37 Completed 2018-08-10 2018-09-28 2018-09-03 2018-10-15 2018-09-24 2018-10-30 2018-10-29 2018-10-31 2018-12-13 2019-01-03 Genre pour le PARIIS, les the institutional framework Selection outils de son opérationnalisation et la proposition d'un dispositif de suivi/Évaluation MR-PARIIS - MR-73694-CS- Individual INDV / Recrutement d'un Component A: Modernizing Under IDA / D2520 Post Consultant Limited 15,000.00 0.00 2018-08-13 2019-11-14 2018-09-03 2018-09-24 2018-10-29 2018-11-05 consultant pour une the institutional framework Implementation Selection formation sur le logiciel MS Project MR-PARIIS - MR-79873-CS- INDV / Recrutement d'un Individual consultant pour appuyer les Component A: Modernizing Under IDA / D2520 Post Consultant Limited 10,000.00 0.00 2018-10-22 2020-01-17 2018-10-29 2018-11-05 2018-12-10 2019-01-09 PMA, et le GNPC dans the institutional framework Implementation Selection l'élaboration de leurs plans d'actions MR-PARIIS - MR-54834-CS- Component A: Modernizing CDS / Recrutement du IDA / D2520 Prior Direct Selection Direct 7,000.00 0.00 Canceled 2016-11-01 2016-11-03 2018-02-19 2018-04-20 the institutional framework Coordinateur de Projet MR-PARIIS - MR-54853-CS- Individual Component A: Modernizing INDV / Recrutement Expert IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-04-19 2017-05-10 2018-03-01 2018-04-30 the institutional framework irrigation zone irriguée Selection MR-PARIIS - MR-54859-CS- CDS / Recrutement Secrétaire Component A: Modernizing IDA / D2520 Post Direct Selection Direct 4,235.00 0.00 Canceled 2017-03-01 2017-05-05 2017-06-23 2017-12-20 du Coordinateur de la Cellule the institutional framework du projet MR-PARIIS - MR-54850-CS- Individual INDV / Recrutement Component A: Modernizing IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-03-01 2018-04-30 Responsable passation des the institutional framework Selection marchés RPM MR-PARIIS - MR-54826-CS- Individual INDV / Recrutement Component A: Modernizing IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-04-01 2018-05-01 Responsable administratif et the institutional framework Selection financier RAF MR-PARIIS - MR-54832-CS- Individual Component A: Modernizing INDV / Recrutement assistant IDA / D2520 Prior Consultant Open 2,000.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-03-01 2018-04-30 the institutional framework comptable Selection MR-PARIIS - MR-54846-CS- Individual Component A: Modernizing INDV / Recrutement du IDA / D2520 Prior Consultant Open 2,600.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-03-01 2018-04-30 the institutional framework Comptable Selection MR-PARIIS - MR-54848-CS- Individual INDV / Recrutement Component A: Modernizing IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-03-01 2018-04-30 Spécialiste Genre et Aspects the institutional framework Selection Fonciers MR-PARIIS - MR-54856-CS- Individual Component A: Modernizing INDV / Recrutement expert IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-03-01 2018-04-30 the institutional framework irrigation zone culture Selection pluviale MR-PARIIS - MR-54854-CS- Individual Component A: Modernizing INDV / Recrutement Expert IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-11-01 2017-11-22 2018-03-01 2018-04-30 the institutional framework Agronome Selection MR-PARIIS - MR-54857-CS- Individual INDV / Recrutement Component A: Modernizing IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-03-01 2018-04-30 Spécialiste environnemental the institutional framework Selection et social MR-PARIIS - MR-54860-CS- Individual INDV / Recrutement Component A: Modernizing IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-03-01 2018-04-30 Responsable suivi et the institutional framework Selection évaluation RSE MR-PARIIS - MR-54839-CS- Individual INDV / Recrutement Component A: Modernizing IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-03-01 2017-11-05 2017-11-26 2018-03-01 2018-04-30 Spécialiste communication et the institutional framework Selection gestion de connaissance MR-PARIIS - MR-69039-CS- Individual Component A: Modernizing INDV / Etudes pour l'analyse IDA / D2520 Post Consultant Limited 1,406.00 0.00 Canceled 2018-07-17 2018-08-01 2018-08-31 2018-10-06 2018-10-07 the institutional framework du sol Selection MR-PARIIS - MR-69045-CS- CDS / Convention de partenariat avec le CNRADA Component A: Modernizing (Encadrement et IDA / D2520 Post Direct Selection Direct 22,500.00 0.00 Canceled 2018-07-10 2018-07-21 2018-08-24 2019-02-20 the institutional framework accompagnement, missions d'appui et Acquisition des intrants agricoles) Individual MR-PARIIS - MR-54855-CS- Component A: Modernizing IDA / D2520 Prior Consultant Open 4,000.00 0.00 Canceled 2017-04-06 2017-05-25 2017-06-15 2017-07-20 2017-08-06 INDV / Revision PAD the institutional framework Selection MR-PARIIS - MR-54849-CS- Component A: Modernizing CDS / Convention avec DSCSE IDA / D2520 Post Direct Selection Direct 27,500.00 0.00 Canceled 2017-05-01 2017-05-11 2017-10-01 2017-11-30 the institutional framework pour situation de référence MR-PARIIS - MR-54831-CS- Component A: Modernizing CDS / Convention avec DSCSE IDA / D2520 Post Direct Selection Direct 10,000.00 0.00 Canceled 2017-03-01 2017-03-11 2017-12-01 2017-12-31 the institutional framework cadrage des activités du MA MR-PARIIS - MR-54851-CS- Individual INDV / TDRs des activités Component A: Modernizing IDA / D2520 Post Consultant Open 9,000.00 0.00 Canceled 2017-10-22 2017-11-04 2017-11-05 2017-12-05 2018-01-09 pour phase de démarrage du the institutional framework Selection projet Page 7 MR-PARIIS - MR-54825-CS- Individual Component A: Modernizing INDV / Etats des lieux du IDA / D2520 Post Consultant Open 16,911.00 0.00 Canceled 2017-06-10 2017-11-05 2017-11-26 2017-12-31 2018-06-29 the institutional framework secteur agricole Selection MR-PARIISMR-93628-CS- Individual INDV / Etude pour l'Etat des Component A: Modernizing Under IDA / D2520 Post Consultant Limited 15,000.00 0.00 2019-03-30 2019-09-26 2019-04-06 2019-04-27 2019-06-01 2019-07-01 lieux de la Recherche Action the institutional framework Implementation Selection dans le pays MR-PARIISMR-93640-CS- Individual INDV / Etude de Diagnostic Component A: Modernizing Pending IDA / D2520 Post Consultant Limited 10,000.00 0.00 2019-04-16 2019-04-23 2019-05-14 2019-05-28 2019-06-27 des filières, marchés, eau et the institutional framework Implementation Selection genre MR-PARIISMR-93645-CS- Individual INDV / Assistance technique Component A: Modernizing Under IDA / D2520 Post Consultant Limited 36,000.00 0.00 2019-02-07 2019-03-21 2019-02-14 2019-03-07 2019-04-04 2019-12-30 résidentielle à la Direction de the institutional framework Implementation Selection l'Aménagement Rural /MDR MR-PARIISMR-93654-CS- INDV / Elaboration d'un plan Individual Component A: Modernizing Under de développement de IDA / D2520 Post Consultant Limited 15,000.00 0.00 2019-03-20 2020-09-27 2019-03-27 2019-04-17 2019-05-01 2019-05-31 the institutional framework Implementation l'agriculture irriguée dans les Selection ZIP MR-PARIISMR-93667-CS- Individual INDV / Etude d'impact Component A: Modernizing Under IDA / D2520 Post Consultant Limited 26,000.00 0.00 2019-03-21 2019-12-05 2019-03-28 2019-04-27 2019-06-01 2019-07-31 environnemental the institutional framework Implementation Selection et social des sous projets MR-PARIISMR-93637-CS- Individual INDV / Etude pour un Component A: Modernizing Under IDA / D2520 Post Consultant Limited 15,000.00 0.00 2019-03-28 2019-04-01 2019-04-27 2019-04-09 2019-05-18 2019-04-02 2019-06-22 2019-07-22 inventaire actualisé des the institutional framework Implementation Selection ravageurs MR-PARIISMR-93711-CS- Component A: Modernizing Under CDS / Assistance pour IDA / D2520 Post Direct Selection Direct 4,600.00 0.00 2019-01-16 2019-02-25 2019-01-21 2019-02-05 2020-01-31 the institutional framework Implementation l'exploitation du Tom2Pro MR-PARIIS - MR-73600-CS- INDV / Recrutement d'un Individual Component A: Modernizing consultant pour l'appui à la IDA / D2520 Post Consultant Limited 10,000.00 0.00 Canceled 2018-08-10 2018-08-31 2018-09-21 2018-10-26 2018-11-25 the institutional framework prise en compte des mesures Selection de sauvegarde sociale PDIAE 01 / Note méthodologique pour la Individual détermination des critères de Component A: Modernizing Pending IDA / D2550 Post Consultant Limited 6,000.00 0.00 2019-04-18 2019-04-21 2019-05-01 2019-05-07 2019-05-22 choix des zones d'intervention the institutional framework Implementation Selection du nouveau projet PDIAE/Zones pluviales. MR-PARIISMR-122608-CS- Individual INDV / Elaboration d'un Component A: Modernizing IDA / D2520 Post Consultant Limited 19,500.00 0.00 Under Review 2019-07-15 2020-04-02 2019-07-20 2019-08-10 2019-09-14 2019-10-14 Manuel d'exécution (MEP) the institutional framework Selection pour le Projet PDIAE/ZP MR-PARIISMR-122611-CS- INDV / Recrutement d'un Individual consultant pour l'élaboration Component A: Modernizing IDA / D2520 Post Consultant Limited 9,700.00 0.00 Under Review 2019-07-15 2019-09-26 2019-07-20 2019-08-10 2019-09-14 2019-10-14 d'un cadre de politique de the institutional framework Selection réinstallation des populations (CPRP) pour le Projet PDIAE/ZP MR-PARIISMR-122612-CS- INDV / Etude d’analyse des Individual Component A: Modernizing Pending groupes cibles bénéficiaires et IDA / D2520 Post Consultant Limited 9,700.00 0.00 2019-07-22 2019-07-27 2019-08-17 2019-09-21 2019-10-21 the institutional framework Implementation d'identification des zones à Selection couvrir par le projet PDIAE/ZP MR-PARIISMR-122613-CS- INDV / Etude sur le Cadre de Individual Component A: Modernizing Pending gestion des pestes et IDA / D2520 Post Consultant Limited 9,700.00 0.00 2019-07-18 2019-07-23 2019-08-13 2019-09-17 2019-10-17 the institutional framework Implementation pesticides (CGPP) du projet Selection PDIAE/ZP : MR-PARIISMR-122615-CS- INDV / Etude sur la Individual valorisation des sous-produits Component A: Modernizing Pending IDA / D2520 Post Consultant Limited 9,700.00 0.00 2019-07-15 2019-07-20 2019-08-10 2019-09-14 2019-10-14 de l’Agriculture pour le the institutional framework Implementation Selection Développement de l’Elevage pour le projet PDIAE/ZP MR-PARIISMR-93758-CS- CDS / Convention de Component A: Modernizing partenariat avec la Société IDA / D2520 Post Direct Selection Direct 42,500.00 0.00 Canceled 2019-01-23 2019-01-28 2019-02-04 2020-01-30 the institutional framework Nationale de Développement Rural SONADER (OSI irrigué) MR-PARIISMR-93657-CS- CDS / Convention de partenariat avec le Centre Component A: Modernizing IDA / D2520 Post Direct Selection Direct 189,000.00 0.00 Canceled 2019-02-06 2019-02-11 2019-02-26 2019-12-23 National de Recherche the institutional framework Agronomique (CNRADA) pour la Recherche Action MR-PARIISMR-122624-CS- Individual INDV / réalisation d'une Component A: Modernizing IDA / D2520 Post Consultant Limited 14,000.00 0.00 Canceled 2019-07-22 2019-10-07 2019-07-27 2019-08-17 2019-09-21 2019-11-05 cartographie des risques pour the institutional framework Selection les activités du Projet PARIIS MR-PARIISMR-157148-CS- Component B: Financing Individual INDV / ETUDE Pour Les Under IDA / D2520 irrigation investment Post Consultant Limited 10,000.00 0.00 2020-02-06 2020-02-12 2020-02-11 2020-03-03 2020-03-17 2020-04-16 PROCÉDURES DE GESTION DU Implementation solutions Selection TRAVAIL MR-PARIISMR-157150-CS- INDV / ETUDE pour La Component B: Financing Individual RÉALISATION d'un PLAN Under IDA / D2520 irrigation investment Post Consultant Limited 15,000.00 0.00 2020-02-10 2020-02-12 2020-02-15 2020-03-07 2020-03-21 2020-04-20 D’ENGAGEMENT Implementation solutions Selection ENVIRONNEMENTAL ET SOCIAL (PEES) Page 8 MR-PARIISMR-157151-CS- INDV / ETUDE pour la RÉALISATION d'un PLAN Component B: Financing Individual D’ENGAGEMENT DES PARTIES Under IDA / D2520 irrigation investment Post Consultant Limited 15,000.00 0.00 2020-02-10 2020-02-12 2020-02-17 2020-03-09 2020-03-23 2020-04-22 PRENANTES (PEPP) Implementation solutions Selection COMPRENANT UN MÉCANISME DE GESTION DES PLAINTES (MGP) MR-PARIISMR-169968-CS- INDV / Etude pour évaluer les Individual processus et les instances/ Component A: Modernizing Pending IDA / D2520 Post Consultant Limited 15,000.00 0.00 2020-05-15 2020-05-22 2020-06-12 2020-07-17 2020-08-16 instruments de planification the institutional framework Implementation Selection locale et de gestion locale du foncier et de l'eau MR-PARIISMR-169972-CS- Individual INDV / Etudes Diagnostiques Component A: Modernizing Pending IDA / D2520 Post Consultant Limited 10,000.00 0.00 2020-07-24 2020-07-31 2020-08-15 2020-09-19 2020-10-19 locales en Filière/Marché, the institutional framework Implementation Selection Foncier, Eau et Genre MR-PARIISMR-170920-CS- Component B: Financing Individual INDV / Etude de capitalisation Pending IDA / D2520 irrigation investment Post Consultant Limited 15,000.00 0.00 2020-08-27 2020-09-03 2020-09-18 2020-10-02 2020-11-01 des pratiques de la lutte Implementation solutions Selection intégrée en Mauritanie MR-PARIISMR-175189-CS- Individual INDV / Recrutement de 2 Component A: Modernizing IDA / D2520 Post Consultant Open 48,000.00 0.00 Canceled 2020-06-22 2020-06-15 2020-08-05 2020-08-26 2020-09-16 2020-10-22 Assistants Régionaux pour les the institutional framework Selection Nouvelles ZIP MR-PARIISMR-182848-CS- Individual INDV / Recrutement d'un Component A: Modernizing Under IDA / D2520 Post Consultant Open 24,000.00 0.00 2020-07-15 2020-10-23 2020-09-02 2020-09-23 2020-10-28 2021-10-23 Assistant Régional Zone Sud- the institutional framework Implementation Selection Est MR-PARIISMR-182849-CS- Individual Component A: Modernizing Under INDV / Recrutement d'un IDA / D2520 Post Consultant Open 24,000.00 0.00 2020-07-15 2020-10-23 2020-09-02 2020-09-23 2020-10-28 2021-10-23 the institutional framework Implementation Assistant Régional Zone Est Selection MR-PARIISMR-207958-CS- Component C: Knowledge Individual INDV / Recrutement d'un IDA / D2520 management and Post Consultant Limited 20,000.00 15,724.60 Signed 2020-12-16 2021-01-20 2020-12-23 2021-01-29 2021-01-07 2021-02-17 2021-01-21 2021-02-17 2022-01-16 assistant en Passation de coordination Selection Marchés 002 / PI / CIAIS / PARIIS-MR Individual Component A: Modernizing Under / 2021 / Recrutement d'un IDA / D2520 Post Consultant Limited 22,286.00 0.00 2021-05-09 2021-05-21 2021-05-14 2021-06-04 2021-07-09 2022-01-05 the institutional framework Implementation Spécialiste Sauvegardes Social Selection Page 9 PLAN DE PASSATION DE MARCHÉS (Partie Textuelle) Information sur le Projet : Nom du pays : République du Bénin Nom du Projet : PROJET D’APPUI A LA COMPETITIVITE DES FILIERES ET A LA DIVERSIFICATION DES EXPORTATIONS (PACOFIDE) No d’identification du projet : P168132 Agence d’exécution du Projet : UG/ProCAD Date du plan de passation des marchés : Mai 2019 Période couverte par ce plan de passation des marchés : du 15 Mai au 31 Décembre 2019 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, au cas où la procédure de passation des marché est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Travaux [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Autres informations pertinentes sur la passation des marchés « Sans objet » PROCUREMENT Benin : AGRICULTURAL COMPETITIVENESS AND EXPORT DIVERSIFICATION PROJECT PLAN General Information Country: Benin Bank’s Approval Date of the Original Procurement Plan: 2019-05-22 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168132 GPN Date: 2019-05-21 Project Name: AGRICULTURAL COMPETITIVENESS AND EXPORT DIVERSIFICATION PROJECT Loan / Credit No: IDA / V2690, IDA / 66630 A Executing Agency(ies): griculture Competitiveness Management Unit WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BJ-UCP / PADA-210562-CW- Pending RFQ / Travaux Component 4: Project Request for Single Stage - One 2021-08- IDA / 66630 Post Limited 30,000.00 0.00 Implementat 2020-12-26 2021-02-20 d'aménagement management Quotations Envelope 19 ion (cloisonnement) des bureaux de l'UCP du Projet PACOFIDE GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-UCP / PADA-115496-GO- RFQ / Fourniture de matériel Under Component 4: Project Request for Single Stage - One informatique (desktop, laptop, IDA / V2690 Post Limited 90,000.00 0.00 Implementati 2019-06-25 2020-12-08 2019-07-25 2019-09-23 management Quotations Envelope imprimante, scanner, on onduleurs etc) BJ-UCP / PADA-115497-GO- Under Component 4: Project Request for Single Stage - One RFQ / Fourniture de mobilier IDA / V2690 Post Limited 100,000.00 0.00 Implementati 2019-06-25 2020-12-09 2019-08-13 2019-10-12 management Quotations Envelope et matériels de bureau on BJ-UCP / PADA-115498-GO- Pending RFQ / Fournitures de bureau Component 4: Project Request for Single Stage - One IDA / V2690 Post Limited 20,000.00 0.00 Implementati 2019-06-25 2019-07-30 2019-10-28 et consommables management Quotations Envelope on informatiques BJ-UCP / PADA-199280-GO- RFQ / Fourniture et Under Component 4: Project Request for Single Stage - One installation de climatiseurs IDA / V2690 Post Limited 34,000.00 0.00 Implementati 2020-10-24 2020-12-08 2020-12-19 2021-06-17 management Quotations Envelope pour le siège de l'UCP du on Projet PACOFIDE BJ-UCP / PADA-199286-GO- RFQ / Fourniture et Pending installation des équipements Component 4: Project Request for Single Stage - One IDA / V2690 Post Limited 75,000.00 0.00 Implementati 2020-10-24 2020-12-19 2021-06-17 de connexion réseaux pour le management Quotations Envelope on siège de l'UCP du Projet PACOFIDE BJ-UCP / PADA-199288-GO- RFQ / Entretien et Pending Component 4: Project Request for Single Stage - One maintenance des matériels IDA / V2690 Post Limited 34,000.00 0.00 Implementati 2020-11-28 2021-01-23 2021-07-22 management Quotations Envelope informatique et de bureau on pour l'UCP du Projet PACOFIDE BJ-UCP / PADA-204177-GO- RFQ / Recrutement d'un Under prestataire pour l'entretien et Component 4: Project Request for Single Stage - One IDA / 66630 Post Limited 17,000.00 0.00 Implementati 2020-11-18 2020-12-08 2021-01-13 2021-07-12 le nettoyage quotidien des management Quotations Envelope on bureaux de l'UCP du Projet PACOFIDE BJ-UCP / PADA-208849-GO- RFQ / Fourniture et installation de Logiciel de Under Component 4: Project Request for Single Stage - One gestion financière et IDA / 66630 Post Limited 25,000.00 0.00 Implementati 2020-12-19 2020-12-16 2021-02-13 2021-08-12 management Quotations Envelope comptable et formation sur le on logiciel pour l'UCP du Projet PACOFIDE BJ-UCP / PADA-210367-GO- RFQ / Entretien et Pending maintenance des climatiseurs Component 4: Project Request for Single Stage - One IDA / 66630 Post Limited 30,000.00 0.00 Implementati 2020-12-26 2021-02-20 2021-08-19 du siège de l'UCP du Projet management Quotations Envelope on PACOFIDE pour une période de 02 ans BJ-UCP / PADA-115495-GO- Component 4: Project Request for Single Stage - One RFQ / Fourniture de matériel IDA / V2690 Post Limited 200,000.00 0.00 Canceled 2019-07-20 2019-08-24 2019-11-22 management Quotations Envelope roulant BJ-UCP / PADA-210371-GO- Pending UN / Fourniture de matériel Component 4: Project UN Agencies IDA / 66630 Post Direct 200,000.00 0.00 Implementati 2021-01-26 2021-01-31 2021-03-07 2021-09-03 roulant pour l'UCP du Projet management (Direct) on PACOFIDE BJ-UCP / PADA-216059-GO- Component 1: Strengthening UN / Acquisition de trois (03) the enabling environment Pending UN Agencies véhicules pick-up IDA / 66630 and infrastructure for agri- Post Direct 450,000.00 0.00 Implementati 2021-01-26 2021-01-31 2021-03-07 2021-09-03 (Direct) frigorifiques au profit de food value chains on l'ABSSA development BJ-UCP / PADA-216065-GO- RFQ / Acquisition de 50 Pending Component 4: Project Request for Single Stage - One tablettes pour les opérations IDA / 66630 Post Limited 14,000.00 0.00 Implementati 2021-02-10 2021-04-07 2021-10-04 management Quotations Envelope de collecte digitalisée de on données Page 1 BJ-ACMU-227876-GO-DIR / Acquisition de 500 000 plants d'anacardiers en vue du Component 2: Increasing Pending renouvellement des nouvelles IDA / 66630 productivity, connectivity, Post Direct Selection Direct 510,000.00 0.00 Implementati 2021-04-05 2021-04-10 2021-05-15 2021-07-14 plantations d'anacardes dans value addition and resilience on le cadre de la mise en œuvre de la Convention entre le PACOFIDE et l'ATDA 4 BJ-ACMU-227879-GO-RFQ / Pending Component 4: Project Request for Single Stage - One Acquisition de matériels IDA / 66630 Post Limited 25,000.00 0.00 Implementati 2021-04-11 2021-06-06 2021-12-03 management Quotations Envelope informatiques et Accessoires on BJ-ACMU-227883-GO-RFQ / Acquisition et installation Pending Component 4: Project Request for Single Stage - One d'équipements de IDA / 66630 Post Limited 35,000.00 0.00 Implementati 2021-04-17 2021-06-12 2021-08-11 management Quotations Envelope visioconférence au profit du on projet BJ-ACMU-227886-GO-RFQ / Pending Component 4: Project Request for Single Stage - One Acquisition de mobiliers de IDA / 66630 Post Limited 10,000.00 0.00 Implementati 2021-04-17 2021-06-12 2021-07-12 management Quotations Envelope bureau on BJ-ACMU-232341-GO-RFB / Component 1: Strengthening Acquisition et installation de the enabling environment Under Single Stage - One cinq (05) stations synoptiques IDA / 66630 and infrastructure for agri- Post Request for Bids Open - National 250,000.00 0.00 Implementati 2021-05-14 2021-06-08 2021-05-19 2021-06-11 2021-06-30 2021-07-30 2021-09-03 2022-03-02 Envelope automatiques télétransmises food value chains on au profit de Météo Bénin development BJ-ACMU-232352-GO-RFQ / Acquisition des normes pour Component 1: Strengthening la méthode d’analyse, the enabling environment Pending Request for Single Stage - One d’échantillons et de IDA / 66630 and infrastructure for agri- Post Limited 42,800.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 Quotations Envelope consommables pour la food value chains on validation des méthodes à development accréditer au profit de LCSSA BJ-ACMU-233814-GO-RFB / Acquisition de 4 kits Biomédix complet pour la réalisation des tests rapides des paramètres microbiologiques Component 2: Increasing Pending Single Stage - One de base et de 4 kits CDR IDA / 66630 productivity, connectivity, Post Request for Bids Open - National 145,000.00 0.00 Implementati 2021-05-17 2021-05-22 2021-07-03 2021-08-02 2021-09-06 2022-03-05 Envelope OXITESTER STANDARDS pour value addition and resilience on les tests rapides des paramètres physico- chimiques de base au profit des DDAEP et de l’ABSSA BJ-ACMU-233816-GO-RFQ / Acquisition des consommables pour les kits Biomédix nécessaires aux tests rapides des paramètres Component 2: Increasing Pending microbiologiques de base et Request for Single Stage - One IDA / 66630 productivity, connectivity, Post Open - National 88,000.00 0.00 Implementati 2021-06-01 2021-07-27 2022-01-23 les kits CDR OXITESTER Quotations Envelope value addition and resilience on STANDARDS pour les tests rapides des paramètres physico-chimiques de base au profit des DDAEP et de l’ABSSA BJ-ACMU-233820-GO-RFQ / Acquisition de matériels de Component 2: Increasing Pending Request for Single Stage - One prélèvement d’échantillons et IDA / 66630 productivity, connectivity, Post Open - National 20,000.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 Quotations Envelope de contrôle au profit de value addition and resilience on l'ABSSA BJ-ACMU-233853-GO-RFQ / Acquisition d'un lot de matériel informatique, de fourniture, de consommables Component 2: Increasing Pending Request for Single Stage - One informatiques et écran de IDA / 66630 productivity, connectivity, Post Limited 99,000.00 0.00 Implementati 2021-06-06 2021-08-01 2022-01-28 Quotations Envelope projection, et d'équipements value addition and resilience on au profit de la DPP, IFA Bénin, IAIAB, PASCiB, PASCiB et des Cellules Communales BJ-ACMU-233888-GO-RFQ / Acquisition des Kits (1 ensemble matériel d’analyse Component 2: Increasing Pending KOR, 1 sac, 1 paire de bottes, Request for Single Stage - One IDA / 66630 productivity, connectivity, Post Limited 99,500.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 1 cordeau de 50 mètres, 1 Quotations Envelope value addition and resilience on décamètre et 1 Imperméable) de matériel au profit des agents de terrain BJ-ACMU-232357-GO-RFQ / Acquisition des matériels didactiques et de Component 1: Strengthening sonorisation pour le the enabling environment Pending Request for Single Stage - One renforcement des capacités IDA / 66630 and infrastructure for agri- Post Limited 20,000.00 0.00 Implementati 2021-05-26 2021-07-21 2022-01-17 Quotations Envelope des acteurs des filières food value chains on Ananas et Anacarde pour leur development participation aux foires virtuelles BJ-ACMU-233836-GO-RFQ / Acquisition de ruches, rûchettes et autres Component 2: Increasing Pending Request for Single Stage - One équipements apicoles pour la IDA / 66630 productivity, connectivity, Post Limited 16,200.00 0.00 Implementati 2021-05-22 2021-07-17 2022-01-13 Quotations Envelope mise en place de système value addition and resilience on d'intégration Apiculture - Anacardier par l'INRAB BJ-ACMU-233837-GO-RFB / Acquisition d'équipements au profit du LCSSA (Chromatographe en phase liquide couplé à la Component 2: Increasing Pending spectrométrie de masse (LC- Single Stage - One IDA / 66630 productivity, connectivity, Post Request for Bids Open - International 1,042,000.00 0.00 Implementati 2021-05-21 2021-05-26 2021-07-07 2021-08-06 2021-09-10 2022-03-09 MS-MS), Système de Envelope value addition and resilience on Distillateur d'azote kjeldahl K350 couplé à un Minéralisateur K-439 muni de Scruber K-415 avec accessoires, Extracteur Page 2 BJ-ACMU-235772-GO-RFQ / Component 1: Strengthening Under Acquisition de deux (02) the enabling environment Request for Single Stage - One IDA / 66630 Post Limited 60,000.00 0.00 Implementati 2021-06-02 2021-06-08 2021-07-28 2022-01-24 serveurs au profit de Météo and infrastructure for agri- Quotations Envelope on Bénin food value chains development BJ-ACMU-236176-GO-RFQ / Acquisition des intrants, Component 2: Increasing Pending matériels et équipements Request for Single Stage - One IDA / 66630 productivity, connectivity, Post Open - National 52,000.00 0.00 Implementati 2021-05-30 2021-07-25 2022-01-21 pour la démonstration des Quotations Envelope value addition and resilience on technologies de production et de transformation NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-UCP / PADA-212482-NC- RFP / Recrutement d'une Pending Agence de Communication Component 4: Project Request for Single Stage - One IDA / 66630 Post Limited 80,000.00 0.00 Implementati 2021-02-13 2021-04-10 2021-10-07 pour la prise en charge de la management Quotations Envelope on communication sur les activités du Projet PACOFIDE BJ-ACMU-233852-GO-RFQ / Pending Acquisition de logiciels de SIG Component 4: Project Request for Single Stage - One IDA / 66630 Post Limited 10,000.00 0.00 Implementati 2021-05-26 2021-07-21 2022-01-17 au profit du MAEP pour management Quotations Envelope on l'opérationnalisation du SIGA BJ-ACMU-233833-GO-RFQ / Recrutement d'un prestataire Component 2: Increasing Pending Request for Single Stage - One pour la multiplication du IDA / 66630 productivity, connectivity, Post Limited 16,800.00 0.00 Implementati 2021-05-26 2021-07-21 2022-01-17 Quotations Envelope guide de reconnaissance des value addition and resilience on ravageurs de l'ananas BJ-ACMU-233835-CW-RFQ / Recrutement d'un prestataire Component 2: Increasing Pending pour l'entretien des parcs à Request for Single Stage - One IDA / 66630 productivity, connectivity, Post Open - National 21,000.00 0.00 Implementati 2021-05-29 2021-07-24 2022-01-20 bois et germosplasmes : Quotations Envelope value addition and resilience on nettoyage, fauchage, labours, sarclages et pare-feux CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-UCP / PADA-115500-CS- Consultant CQS / Recrutement d'un Component 4: Project Under IDA / V2690 Post Qualification Limited 20,000.00 0.00 2019-06-20 2019-07-04 2019-07-11 2019-07-25 2019-08-24 consultant pour l'élaboration management Implementation Selection du CGPP BJ-UCP / PADA-115501-CS- Consultant CQS / Recrutement d'un Component 4: Project Under IDA / V2690 Post Qualification Limited 20,000.00 0.00 2019-06-20 2019-07-04 2019-07-11 2019-07-25 2019-08-24 consultant pour l'élaboration management Implementation Selection du CPRP BJ-UCP / PADA-115506-CS- Consultant INDV / Recrutement d'un Component 4: Project Under IDA / V2690 Post Qualification Open - National 80,000.00 0.00 2019-06-28 2021-05-10 2019-06-29 2019-07-13 2019-07-20 2019-08-03 2019-10-02 cabinet pour la réalisation de management Implementation Selection l'étude de référence BJ-UCP / PADA-115508-CS- Consultant CQS / Recrutement d'un Component 4: Project Pending IDA / V2690 Post Qualification Open - National 80,000.00 0.00 2019-06-28 2019-07-13 2019-07-27 2019-08-03 2019-08-17 2019-10-16 cabinet pour le recrutement management Implementation Selection du personnel clé de l'UCNP BJ-UCP / PADA-115509-CS- CQS / Recrutement d'un Consultant cabinet pour l'élaboration des Component 4: Project Pending IDA / V2690 Post Qualification Open - National 90,000.00 0.00 2019-06-28 2019-07-13 2019-07-27 2019-08-03 2019-08-17 2019-10-16 manuels de gestion des management Implementation Selection fenêtres de financement du projet BJ-UCP / PADA-150343-CS- QCBS / Recrutement de cabinets pour les études de Component 3: Promoting Quality And Cost- Pending faisabilité et le contrôle et la IDA / V2690 private investment and Post Open - International 625,000.00 0.00 2020-01-10 2020-01-31 2020-03-15 2020-04-12 2020-05-12 2020-06-16 2020-07-21 2021-01-17 Based Selection Implementation surveillance des travaux pour access to finance la réhabilitation de 1200 km de pistes rurales BJ-UCP / PADA-115510-CS- QCBS / Recrutement d’un cabinet pour l’appui technique Component 2: Increasing Quality And Cost- à l’amélioration de la IDA / V2690 productivity, connectivity, Post Open - International 420,000.00 0.00 Under Review 2020-01-10 2021-01-07 2020-01-31 2020-03-15 2020-04-12 2020-05-12 2020-06-16 2020-07-21 2021-01-17 Based Selection compétitivité des filières (CRE) value addition and resilience (Compettivness,Reinforcement Engagement) BJ-UCP / PADA-150341-CS- Component 1: Strengthening Consultant INDV / Recrutement d'un the enabling environment Pending IDA / V2690 Post Qualification Open - National 300,000.00 0.00 2020-08-25 2020-08-30 2020-09-21 2020-09-28 2020-10-10 2021-04-08 cabinet pour l’EIES d’un and infrastructure for agri- Implementation Selection tronçon de route à réhabiliter food value chains development BJ-UCP / PADA-209066-CS- LCS / Sélection d'un cabinet d'audit externe pour l'audit du Component 4: Project Least Cost Under PPF et des comptes exercices IDA / 66630 Post Open - National 35,000.00 0.00 2020-12-15 2021-01-07 2021-01-05 2021-02-18 2021-03-18 2021-04-17 2021-05-22 2021-06-26 2021-12-23 management Selection Implementation clos au 31 décembre 2021 et au 31 décembre 2022 pour l'UCP du Projet PACOFIDE. Page 3 BJ-UCP / PADA-209085-CS- QCBS / Recrutement d'un Component 1: Strengthening cabinet pour la réalisation des the enabling environment études (Avant-Projet Détaillé), Quality And Cost- Under IDA / 66630 and infrastructure for agri- Post Open - National 625,000.00 0.00 2020-12-16 2021-01-07 2021-01-06 2021-02-19 2021-03-19 2021-04-18 2021-05-23 2021-06-27 2022-06-27 le contrôle et la surveillance Based Selection Implementation food value chains des travaux de réhabilitation development de 1 566, 56 km de pistes rurales. BJ-ACMU-232344-CS-INDV / Recrutement d'un consultant international pour appuyer la Component 1: Strengthening conception et le suivi de la the enabling environment Consultant mise en œuvre d'un système IDA / 66630 and infrastructure for agri- Post Qualification Open - International 50,000.00 0.00 Under Review 2021-05-25 2021-06-02 2021-06-15 2021-07-29 2021-08-28 2021-10-02 2022-03-31 d'information agricole food value chains Selection moderne et intégré combinant development des outils de télédétection avec les modèles météorologiques et SIM BJ-ACMU-232353-CS-CQS / Recrutement d'un cabinet pour l'évaluation des besoins Component 1: Strengthening du LAMITA en équipements et the enabling environment Consultant consommables de laboratoire IDA / 66630 and infrastructure for agri- Post Qualification Limited 38,720.00 0.00 Under Review 2021-05-17 2021-06-18 2021-05-31 2021-06-30 2021-08-04 2022-01-31 en lien avec les paramètres de food value chains Selection qualité de l'anacarde et de development l'ananas et la mise en place du système qualité du LAMITA selon la norme ISO 17025 BJ-ACMU-232400-CS-QCBS / Recrutement d'un cabinet pour l’appui à la gestion des Component 1: Strengthening fonds à frais partagés the enabling environment Quality And Cost- Under (matching grant y compris IDA / 66630 and infrastructure for agri- Post Open - International 234,000.00 0.00 2021-05-13 2021-05-24 2021-06-03 2021-06-07 2021-07-17 2021-08-14 2021-09-13 2021-10-18 2021-11-22 2022-11-22 Based Selection Implementation l'Assistance technique aux food value chains bénéficiaires éligibles pour development soutien consultatif tout au long du cycle d’investissement ) BJ-ACMU-233514-CS-CQS / Sélection d'un Consultant Consultant pour le recrutement de la Component 4: Project Under IDA / 66630 Post Qualification Open - National 40,000.00 0.00 2021-05-07 2021-05-21 2021-05-28 2021-07-11 2021-08-10 2021-09-14 2022-03-13 troisième (3è) vague du management Implementation Selection personnel complémentaire du PACOFIDE BJ-ACMU-233839-CS-CQS / Recrutement d’un consultant pour l'élaboration du Component 2: Increasing Consultant Pending document de IDA / 66630 productivity, connectivity, Post Qualification Limited 18,000.00 0.00 2021-05-17 2021-05-31 2021-06-30 2021-08-04 2022-01-31 Implementation professionnalisation des value addition and resilience Selection pépiniéristes et des brigades de réhabilitation BJ-ACMU-233882-CS-CQS / Recrutement d’un consultant Component 2: Increasing Consultant pour la réalisation de la carte Pending IDA / 66630 productivity, connectivity, Post Qualification Open - National 29,000.00 0.00 2021-05-24 2021-06-14 2021-07-28 2021-08-27 2021-10-01 2022-03-30 phytosanitaire au profit de la Implementation value addition and resilience Selection Direction de la Production Végétale (DPV) BJ-ACMU-233883-CS-CQS / Recrutement de consultant pour l'élaboration d'un Component 2: Increasing Consultant Under référentiel environnemental et IDA / 66630 productivity, connectivity, Post Qualification Open - National 18,000.00 0.00 2021-05-24 2021-06-11 2021-06-14 2021-07-28 2021-08-27 2021-10-01 2022-03-30 Implementation Social relatif à l'installation de value addition and resilience Selection nouvelle plantation d'anacardiers BJ-ACMU-233884-CS-CQS / Recrutement de consultant pour l'élaboration d'un Component 2: Increasing Consultant référentiel environnemental et Under IDA / 66630 productivity, connectivity, Post Qualification Open - National 18,000.00 0.00 2021-05-24 2021-06-11 2021-06-14 2021-07-28 2021-08-27 2021-10-01 2022-03-30 Social relatif aux opérations Implementation value addition and resilience Selection de réhabilitation des anciennes plantations d'anacardiers BJ-ACMU-233886-CS-CQS / Recrutement de consultant pour l'élaboration d'un guide Component 2: Increasing Consultant Pending pratique de gestion des IDA / 66630 productivity, connectivity, Post Qualification Open - National 18,000.00 0.00 2021-05-24 2021-06-14 2021-07-28 2021-08-27 2021-10-01 2022-03-30 Implementation déchets et nuisances issus du value addition and resilience Selection développement des CVA du cajou BJ-ACMU-233889-CS-QCBS / Recrutement de prestataires pour la mise en œuvre du Component 2: Increasing Quality And Cost- Conseil Technique Spécialisé IDA / 66630 productivity, connectivity, Post Open - National 463,380.00 0.00 Under Review 2021-05-24 2021-06-21 2021-06-14 2021-07-28 2021-08-25 2021-09-24 2021-10-29 2021-12-03 2022-12-03 Based Selection "production végétale" à value addition and resilience l'endroit des producteurs d'anacarde BJ-ACMU-233890-CS-CQS / Recrutement d'un consultant pour la formation des élus et du personnel technique de Component 2: Increasing Consultant Pending l’IFA-Bénin de l'AIAB et de IDA / 66630 productivity, connectivity, Post Qualification Open - National 20,000.00 0.00 2021-05-24 2021-06-14 2021-07-28 2021-08-27 2021-10-01 2022-03-30 Implementation leurs familles d’acteurs sur les value addition and resilience Selection thématiques spécifique : Bonne gouvernance et développement commercial BJ-ACMU-233891-CS-CQS / Recrutement d'un consultant pour la formation des élus et Component 2: Increasing Consultant du personnel technique de Pending IDA / 66630 productivity, connectivity, Post Qualification Open - National 20,000.00 0.00 2021-05-24 2021-06-14 2021-07-28 2021-08-27 2021-10-01 2022-03-30 l’IFA-Bénin de l'AIAB et de Implementation value addition and resilience Selection leurs familles d’acteurs sur les thématiques spécifique : Plan de marketing et solvabilité Page 4 BJ-ACMU-233892-CS-CQS / Recrutement d'un consultant pour l'élaboration de Component 2: Increasing Consultant plaquette de vulgarisation du Pending IDA / 66630 productivity, connectivity, Post Qualification Open - National 20,000.00 0.00 2021-05-24 2021-06-14 2021-07-28 2021-08-27 2021-10-01 2022-03-30 mécanisme consensuel de Implementation value addition and resilience Selection commercialisation de la noix de cajou intégrant la vente groupée BJ-ACMU-232351-CS-CQS / Recrutement d’un cabinet pour accompagner le service d'inspection sanitaire de Component 1: Strengthening l'ABSSA et le service the enabling environment Quality And Cost- d'inspection phytosanitaire de IDA / 66630 and infrastructure for agri- Post Open - International 60,000.00 0.00 Under Review 2021-06-01 2021-06-18 2021-06-22 2021-08-05 2021-09-02 2021-10-02 2021-11-06 2021-12-11 2022-12-11 Based Selection la DPV à l'accréditation ISO food value chains 17020 et la Formation du development personnel de l’ABSSA et des DDAEP sur la norme ISO 17020 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-UCP / PADA-115499-CS- Individual INDV / Recrutement d'un Component 4: Project Under IDA / V2690 Post Consultant Limited 20,000.00 0.00 2019-06-20 2019-06-25 2019-07-02 2019-07-23 2019-08-22 consultant pour l'élaboration management Implementation Selection du CGES BJ-UCP / PADA-115502-CS- Individual INDV / Recrutement d'un Component 4: Project Pending IDA / V2690 Post Consultant Limited 20,000.00 0.00 2019-06-20 2019-06-25 2019-07-02 2019-07-16 2019-08-15 consultant pour l'élaboration management Implementation Selection du ESCP BJ-UCP / PADA-115503-CS- Individual INDV / Recrutement d'un Component 4: Project Under IDA / V2690 Post Consultant Limited 20,000.00 0.00 2019-06-25 2019-06-30 2019-07-07 2019-07-21 2019-08-20 consultant pour l'élaboration management Implementation Selection du PPSD BJ-UCP / PADA-115504-CS- Individual INDV / Recrutement d'un Component 4: Project Pending IDA / V2690 Post Consultant Limited 20,000.00 0.00 2019-06-25 2019-06-30 2019-07-07 2019-07-21 2019-08-20 consultant pour l'élaboration management Implementation Selection du manuel d'exécution BJ-UCP / PADA-115505-CS- INDV / Recrutement d'un consultant pour l'élaboration Individual Component 4: Project Pending du Manuel de Gestion IDA / V2690 Post Consultant Limited 20,000.00 0.00 2019-06-25 2019-06-30 2019-07-07 2019-07-21 2019-08-20 management Implementation Administrative Financière, Selection Comptable et de Passation des Marchés BJ-UCP / PADA-115511-CS- Component 1: Strengthening INDV / Recrutement d'un the enabling environment Individual consultant pour les études Pending IDA / V2690 and infrastructure for agri- Post Consultant Limited 20,000.00 0.00 2019-06-20 2019-06-25 2019-07-02 2019-07-16 2019-09-14 complémentaires à la Implementation food value chains Selection formulation de la composante development 1 BJ-UCP / PADA-189016-CS- INDV / Recrutement d'un Component 3: Promoting Individual Under consultant pour l'élaboration IDA / V2690 private investment and Post Consultant Limited 20,000.00 0.00 2020-08-17 2020-08-18 2020-08-22 2020-09-12 2020-10-17 2021-04-15 Implementation du code de la consommation access to finance Selection en République du Bénin BJ-UCP / PADA-195606-CS- INDV / Recrutement d'un Individual Component 4: Project Under consultant individuel pour IDA / V2690 Post Consultant Limited 10,000.00 0.00 2020-10-02 2020-09-28 2020-10-07 2020-10-12 2020-10-22 2020-12-21 management Implementation l'appui à la passation des Selection marchés du PACOFIDE BJ-UCP / PADA-201074-CS- INDV / Recrutement d'un Individual deuxième Spécialiste en Component 4: Project Under IDA / V2690 Post Consultant Open 45,000.00 0.00 2020-10-26 2020-12-09 2020-12-14 2021-01-04 2021-02-08 2021-08-07 Passation de Marchés en management Implementation Selection appui aux composantes de l'APIEX pour l'UCP du Projet PACOFIDE BJ-UCP / PADA-201603-CS- Individual INDV / Recrutement du Component 4: Project Under IDA / 66630 Post Consultant Open 84,000.00 0.00 2020-10-30 2020-12-09 2020-12-18 2021-01-08 2021-02-12 2021-08-11 Coordonnateur du Projet management Implementation Selection PACOFIDE BJ-UCP / PADA-201609-CS- INDV / Recrutement d'un Individual Component 4: Project Pending Spécialiste en Gestion IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation Financière pour l'UCP du Selection Projet PACOFIDE BJ-UCP / PADA-201610-CS- INDV / Recrutement d'un Individual Component 4: Project Under Spécialiste en Passation de IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2020-12-01 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation Marchés N°1 pour l'UCP du Selection Projet PACOFIDE BJ-UCP / PADA-201611-CS- INDV / Recrutement d'un Individual Component 4: Project Under Spécialiste en Suivi - IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2020-12-09 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation Evaluation pour l'UCP du Selection Projet PACOFIDE BJ-UCP / PADA-201614-CS- INDV / Recrutement d'un Individual Spécialiste en Développement Component 4: Project Under IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2021-02-22 2020-12-18 2021-01-08 2021-02-12 2021-08-11 des Chaines de Valeur et du management Implementation Selection Secteur Privé pour l'UCP du Projet PACOFIDE Page 5 BJ-UCP / PADA-201616-CS- INDV / Recrutement d'un Individual Component 4: Project Pending Spécialiste en Infrastructure et IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation Logistique pour l'UCP du Selection Projet PACOFIDE BJ-UCP / PADA-201617-CS- INDV / Recrutement d'un Individual Component 4: Project Under Spécialiste en Sauvegarde IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2020-12-09 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation Environnemental pour l'UCP Selection du Projet PACOFIDE BJ-UCP / PADA-201618-CS- INDV / Recrutement d'un Individual Component 4: Project Under Spécialiste en Développement IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2020-12-10 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation Social et Genre pour l'UCP du Selection Projet PACOFIDE BJ-UCP / PADA-201619-CS- Individual INDV / Recrutement d'un Component 4: Project Under IDA / 66630 Post Consultant Open 32,000.00 0.00 2020-10-30 2020-12-10 2020-12-18 2021-01-08 2021-02-12 2021-08-11 Comptable pour l'UCP du management Implementation Selection Projet PACOFIDE BJ-UCP / PADA-201621-CS- Individual INDV / Recrutement d'un Chef Component 4: Project Under IDA / 66630 Post Consultant Open 40,000.00 0.00 2020-10-30 2021-02-22 2020-12-18 2021-01-08 2021-02-12 2021-08-11 Comptable pour l'UCP du management Implementation Selection Projet PACOFIDE BJ-UCP / PADA-201622-CS- INDV / Recrutement d'un Individual Component 4: Project Under Spécialiste en Appui à la IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2021-02-22 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation Productivité Agricole pour Selection l'UCP du Projet PACOFIDE BJ-UCP / PADA-201624-CS- INDV / Recrutement d'un Individual Component 4: Project Pending Spécialiste en Infrastructure IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation de Marchés pour l'UCP du Selection Projet PACOFIDE BJ-UCP / PADA-201627-CS- Individual INDV / Recrutement d'un Component 4: Project Under IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2021-02-22 2020-12-18 2021-01-08 2021-02-12 2021-08-11 Auditeur Interne pour l'UCP du management Implementation Selection Projet PACOFIDE BJ-UCP / PADA-201629-CS- INDV / Recrutement du Individual Component 4: Project Under Responsable des IDA / 66630 Post Consultant Open 45,000.00 0.00 2020-10-30 2021-02-22 2020-12-18 2021-01-08 2021-02-12 2021-08-11 management Implementation Composantes 1 & 3 du l'UCP Selection du Projet PACOFIDE BJ-UCP / PADA-210564-CS- INDV / Sélection d'un consultant individuel chargé Individual de l'élaboration du manuel de Component 4: Project Under IDA / 66630 Post Consultant Limited 30,000.00 0.00 2020-12-21 2021-01-27 2020-12-26 2021-01-16 2021-02-20 2021-08-19 suivi-évaluation et de l' management Implementation Selection opérationnalisation des indicateurs de suivi- évaluation du Projet PACOFIDE BJ-UCP / PADA-210566-CS- INDV / Sélection d'un Individual consultant individuel chargé Component 4: Project Under IDA / 66630 Post Consultant Limited 40,000.00 0.00 2020-12-28 2021-01-07 2021-01-02 2021-04-07 2021-01-23 2021-04-23 2021-02-27 2021-08-26 de l'élaboration du manuel de management Implementation Selection gestion des fonds à frais partagés (matchin grant) BJ-UCP / PADA-210574-CS- INDV / Sélection d'un Individual consultant individuel pour Component 4: Project Under IDA / 66630 Post Consultant Limited 25,000.00 0.00 2021-01-04 2021-01-08 2021-01-09 2021-04-07 2021-01-30 2021-04-23 2021-03-06 2021-09-02 l'élaboration du manuel de management Implementation Selection gestion des fonds de garanties BJ-UCP / PADA-215933-CS- INDV / Recrutement d'un consultant individuel pour la Component 1: Strengthening réalisation de l'état lieux sur the enabling environment Individual la gamme de solution Under IDA / 66630 and infrastructure for agri- Post Consultant Open 26,000.00 0.00 2021-02-02 2021-02-11 2021-03-23 2021-04-13 2021-05-18 2021-11-14 disponibles pour l'adaptation Implementation food value chains Selection et l'atténuation aux development changements climatiques pour les filières ananas et anacarde BJ-UCP / PADA-215938-CS- INDV / Recrutement d'un consultant individuel pour la Component 1: Strengthening mise à jour des textes the enabling environment Individual Under législatifs et règlementaire sur IDA / 66630 and infrastructure for agri- Post Consultant Open 17,000.00 0.00 2021-03-03 2021-04-15 2021-04-21 2021-05-12 2021-06-16 2021-12-13 Implementation la traçabilité, la food value chains Selection transformation, la certification development des produits à fort potentiel d'exportation BJ-UCP / PADA-216051-CS- INDV / Recrutement d'un consultant individuel pour la Component 1: Strengthening réalisation d'une étude the enabling environment Individual Pending comparative des IDA / 66630 and infrastructure for agri- Post Consultant Open 42,000.00 0.00 2021-02-26 2021-04-16 2021-05-07 2021-06-11 2021-12-08 Implementation réglementations techniques food value chains Selection nationales et celles des development marchés internationaux des chaînes de valeur ciblées BJ-UCP / PADA-216064-CS- INDV / Recrutement d'un consultant individuel pour Component 3: Promoting Individual l'approfondissement du Pending IDA / 66630 private investment and Post Consultant Open 20,000.00 0.00 2021-03-15 2021-05-03 2021-05-24 2021-06-28 2021-12-25 diagnostic sur les besoins de Implementation access to finance Selection renforcement des capacités des IF pour accompagner le secteur agricole Page 6 BJ-UCP / PADA-216067-CS- INDV / Recruter un Consultant individuel pour élaboration Individual Component 4: Project Under d'un plan d’actions pour la IDA / 66630 Post Consultant Open 20,000.00 0.00 2021-03-22 2021-05-02 2021-05-10 2021-05-31 2021-07-05 2022-01-01 management Implementation prévention et la lutte contre Selection l’Exploitation, l'Abus Sexuel/Harcellement Sexuel BJ-UCP / PADA-216068-CS- INDV / Recruter un consultant individuel pour assurer la Individual Component 4: Project Under formation des cadres des IDA / 66630 Post Consultant Open 20,000.00 0.00 2021-03-24 2021-05-01 2021-05-12 2021-06-02 2021-07-07 2022-01-03 management Implementation ATDA et des DDAEP impliqués Selection dans le suivi environnemental des activités du PACOFIDE BJ-UCP / PADA-216071-CS- INDV / Recruter un consultant individuel pour assurer la Individual Component 4: Project Under formation des cadres des IDA / 66630 Post Consultant Open 20,000.00 0.00 2021-03-26 2021-05-01 2021-05-14 2021-06-04 2021-07-09 2022-01-05 management Implementation ATDA et des DDAEP impliqués Selection dans le suivi social des activités du PACOFIDE BJ-ACMU-227881-CS-INDV / Recrutement d’un prestataire pour l’évaluation des Component 2: Increasing Individual Under pépiniéristes sélectionnés IDA / 66630 productivity, connectivity, Post Consultant Limited 20,000.00 0.00 2021-04-12 2021-05-21 2021-04-17 2021-05-08 2021-06-12 2021-07-12 Implementation dans le cadre de la mise en value addition and resilience Selection œuvre de la Convention entre PACOFIDE et l'ATDA 4 BJ-ACMU-232345-CS-INDV / Recrutement d'un consultant individuel pour la réalisation Component 1: Strengthening d’une étude comparative et la the enabling environment Individual mise à jour des normes et IDA / 66630 and infrastructure for agri- Post Consultant Open 48,000.00 0.00 Under Review 2021-05-07 2021-04-28 2021-06-25 2021-07-16 2021-08-20 2022-02-16 règlementations techniques food value chains Selection nationales à celles des development marchés internationaux des chaînes de valeur ciblées. BJ-ACMU-232355-CS-INDV / Recrutement d'un consultant Component 1: Strengthening pour le renforcement des the enabling environment Individual Pending capacités des acteurs des IDA / 66630 and infrastructure for agri- Post Consultant Open 20,000.00 0.00 2021-05-26 2021-07-14 2021-08-04 2021-09-08 2022-03-07 Implementation filières Ananas et Anacarde food value chains Selection pour leur participation aux development foires virtuelles BJ-ACMU-232362-CS-INDV / Component 1: Strengthening Recrutement d'un consultant the enabling environment Individual Individuel pour l'élaboration Under IDA / 66630 and infrastructure for agri- Post Consultant Open 14,000.00 0.00 2021-05-10 2021-06-11 2021-06-28 2021-07-19 2021-08-23 2022-02-19 des outils de vulgarisation et Implementation food value chains Selection de diffusion radio agro development climatique BJ-ACMU-233541-CS-CDS / Component 1: Strengthening Recrutement d'un cabinet the enabling environment Under chargé de l'appui technique à IDA / 66630 and infrastructure for agri- Post Direct Selection Direct 420,000.00 0.00 2021-05-06 2021-05-18 2021-05-16 2021-07-20 2022-01-16 Implementation l'amélioration de la food value chains compétitivité des filières (CRE) development BJ-ACMU-233856-CS-INDV / Individual Recrutement d'un consultant Component 4: Project IDA / 66630 Post Consultant Open 30,000.00 0.00 Under Review 2021-06-15 2021-06-14 2021-08-03 2021-08-24 2021-09-28 2022-03-27 pour l'élaboration du Plan management Selection d'Actions Genre du PACOFIDE BJ-ACMU-233858-CS-INDV / Recrutement d'un consultant pour l'élaboration d'une Individual Component 4: Project Pending plateforme de Suivi- IDA / 66630 Post Consultant Open 10,000.00 0.00 2021-07-01 2021-08-19 2021-09-09 2021-10-14 2022-04-12 management Implementation Evaluation et de diffusion des Selection indicateurs de performance du projet BJ-ACMU-232346-CS-INDV / Component 1: Strengthening Recrutement d'un spécialistes the enabling environment Individual en accès aux marchés des Pending IDA / 66630 and infrastructure for agri- Post Consultant Open 24,000.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 produits agricoles (Ananas et Implementation food value chains Selection anacardes) au profit de l'ATDA development 4 pour la conduite des CRE BJ-ACMU-233849-CS-INDV / Recrutement d'un consultant Individual Component 4: Project Pending pour l'élaboration du manuel IDA / 66630 Post Consultant Open 20,000.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-03-13 management Implementation de mise en œuvre de la mise Selection en œuvre de la composante 5 BJ-ACMU-235365-CS-INDV / Component 1: Strengthening Recrutement d'un spécialistes the enabling environment Individual en accès aux marchés des Pending IDA / 66630 and infrastructure for agri- Post Consultant Open 24,000.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 produits agricoles (Ananas et Implementation food value chains Selection anacardes) au profit de l'ATDA development 7 pour la conduite des CRE BJ-ACMU-235373-CS-INDV / Component 1: Strengthening Recrutement d'un ingénieurs the enabling environment Individual spécialistes des filières à Pending IDA / 66630 and infrastructure for agri- Post Consultant Open 24,000.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 haute valeur ajoutée au profit Implementation food value chains Selection de l'ATD 4 pour la conduite development des CRE BJ-ACMU-235375-CS-INDV / Component 1: Strengthening Recrutement d'un ingénieurs the enabling environment Individual spécialistes des filières à Pending IDA / 66630 and infrastructure for agri- Post Consultant Open 24,000.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 haute valeur ajoutée au profit Implementation food value chains Selection de l'ATD 7 pour la conduite development des CRE Page 7 Procurement Plan Balochistan Integrated Water Resources Management and Development Project I. General 1. Bank’s approval Date of the procurement Plan March 19,2016 2. Date of General Procurement Notice: January 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January 2017 to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB (Goods) Above US$ 600,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 4 million All 4. NCB (Works) Upto US$ 4 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract 6. Community Driven Development Above US$ 25,000 First contract 2. Pre-qualification. Bidders for $ 15 million shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued by Balochistan Government July 9, 2010 5. Any Other Special Procurement Arrangements: Some preparatory activities under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) All 3. Individual Above US$ 200,000 July 9, 2010 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Pakistan : PK-Balochistan Integrated Water Resources Management & Development Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2016-10-14 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154255 GPN Date: 2017-07-10 Project Name: PK-Balochistan Integrated Water Resources Management & Development Project Loan / Credit No: IDA / 58850 P Executing Agency(ies): MU Balochistan Integrated Water Resources Management and Development Project WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-PMU-BIWRMDP-14383- Component B: Water, Single Stage - One 12,906,271.0 11,689,958. 2020-02- CW-RFB / Construction of IDA / 58850 Infrastructure and Prior Request for Bids Open - International Signed 2017-05-11 2017-05-17 2017-05-16 2017-05-23 2017-06-30 2017-07-10 2017-07-30 2017-08-21 2017-09-03 2017-09-08 Envelope 0 60 20 Nari Gorge Integrated Scheme Management Investments PK-PMU-BIWRMDP-14453- Component B: Water, CW-RFB / Construction of Single Stage - One 6,475,606.4 2020-03- IDA / 58850 Infrastructure and Post Request for Bids Open - International 8,995,675.00 Terminated 2017-05-22 2017-05-26 2017-05-27 2017-05-26 2017-07-11 2017-07-20 2017-08-10 2017-11-06 2017-09-14 2017-11-20 Gundacha-Nurg Hingri Envelope 9 02 Management Investments Integrated Scheme PK-PMU-BIWRMDP-2420-CW- RFB / Nari Gorge Perennial Component B: Water, Irrigation Scheme - Package 3 Single Stage - One 2018-12- IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,510,643.00 0.00 Canceled 2017-02-28 2017-03-07 2017-04-06 2017-05-06 2017-06-17 of 5 (Luni, Kurak, Bakhra Envelope 09 Management Investments Ghulam Bolak and Marghzani Channels) PK-PMU-BIWRMDP-2419-CW- Component B: Water, RFB / Nari Gorge Perennial Single Stage - One 2018-09- IDA / 58850 Infrastructure and Prior Request for Bids Open - National 1,434,724.00 0.00 Canceled 2017-02-28 2017-03-07 2017-04-06 2017-04-27 2017-06-08 Irrigation Scheme - Package 2 Envelope 01 Management Investments of 5 (Dehpal Channel) PK-PMU-BIWRMDP-2432-CW- RFB / Gundacha Nurg Hingri Scheme - Package 2 of 2 (Construction of Irrigation Channel, Nurg Hingri Off Take Component B: Water, Single Stage - One 2019-09- Weirs and Under Sluice, Nurg IDA / 58850 Infrastructure and Post Request for Bids Open - International 4,601,570.00 0.00 Canceled 2017-05-09 2017-05-19 2017-07-10 2017-08-04 2017-09-17 Envelope 07 Hingri Channels and Guide Management Investments Banks, Glacis Fall Structures, Road Culverts, Outlet Structures and Drainage Culverts) PK-PMU-BIWRMDP-2431-CW- RFB / Gundacha Nurg Hingri Component B: Water, Irrigation Scheme - Package 1 Single Stage - One 2019-08- IDA / 58850 Infrastructure and Post Request for Bids Open - National 3,941,491.00 0.00 Canceled 2017-05-09 2017-05-19 2017-06-24 2017-07-15 2017-08-28 of 2 (Construction of Weir, Envelope 18 Management Investments Undersluice and Head Regulator) PK-PMU-BIWRMDP-2427-CW- RFB / Yetabad Flood Irrigation Component B: Water, Scheme - Package 2 of 6 Single Stage - One 2021-11- IDA / 58850 Infrastructure and Prior Request for Bids Open - International 6,123,689.00 0.00 Canceled 2018-07-12 2018-07-19 2018-09-07 2018-10-02 2018-11-15 (Conveyance System Including Envelope 14 Management Investments Cross Drainage (RD 0+00 to RD 10+750) PK-PMU-BIWRMDP-2428-CW- RFB / Yetabad Flood Irrigation Component B: Water, Scheme - Package 3 of 6 Single Stage - One 2021-11- IDA / 58850 Infrastructure and Prior Request for Bids Open - International 6,123,689.00 0.00 Canceled 2018-07-12 2018-07-19 2018-09-07 2018-10-12 2018-11-25 (Conveyance System including Envelope 24 Management Investments Cross Drainage Structures RD 10+750 to RD 21+500) PK-PMU-BIWRMDP-2423-CW- Component B: Water, RFB / Yetabad Flood Irrigation Single Stage - One 2021-11- IDA / 58850 Infrastructure and Prior Request for Bids Open - International 9,014,788.00 0.00 Canceled 2018-07-12 2018-07-19 2018-09-07 2018-10-02 2018-11-15 Scheme - Package 1 of 6 (Weir Envelope 14 Management Investments & Buildings) PK-PMU-BIWRMDP-69116- CW-RFB / Yetabad Flood Component B: Water, Single Stage - One 15,151,815.0 2020-09- Irrigation Scheme - Package 2 IDA / 58850 Infrastructure and Prior Request for Bids Open - International 0.00 Canceled 2018-08-15 2018-10-31 2018-10-31 2018-08-20 2019-01-09 2019-02-08 2019-03-15 Envelope 0 05 (Conveyance System KM Management Investments 6+000 to KM 21+500) PK-PMU-BIWRMDP-69112- CW-RFB / Yetabad Flood Component B: Water, Single Stage - One 148,484,235. 2020-09- Irrigation Scheme - Package 1 IDA / 58850 Infrastructure and Prior Request for Bids Open - International 0.00 Canceled 2018-08-15 2018-10-31 2018-10-31 2018-08-20 2019-01-09 2019-02-08 2019-03-15 Envelope 00 05 (Weir and Conveyance System Management Investments (KM 0+000 to KM 6+000) PK-PMU-BIWRMDP-79952- Component B: Water, CW-RFB / Construction of Single Stage - One 2021-09- IDA / 58850 Infrastructure and Post Request for Bids Open - International 7,464,230.00 0.00 Canceled 2018-11-12 2018-11-17 2018-11-12 2019-01-04 2019-02-03 2019-03-10 Mushkaf Flood Irrigation Envelope 07 Management Investments Scheme PK-PMU-BIWRMDP-92413- CW-RFQ / Procurement of Works for Production of Plants Component B: Water, Request for Single Stage - One 2019-07- Through Raising of Nurseries IDA / 58850 Infrastructure and Post Open - National 145,279.00 109,366.58 Signed 2019-01-05 2019-02-01 2019-09-20 Quotations Envelope 31 Under B2 Sub Component of Management Investments BIWRMDP at Uthal, Dhadar & Harnai PK-PMU-BIWRMDP-93196- CW-RFB / Procurement of Component B: Water, Single Stage - One 3,589,182.9 2021-04- Civil Works for Nari Gorge IDA / 58850 Infrastructure and Post Request for Bids Open - International 4,270,000.00 Signed 2019-01-03 2019-03-11 2019-01-08 2019-03-11 2019-02-27 2019-04-29 2019-03-29 2019-09-03 2019-04-26 2020-02-07 Envelope 4 15 Integrated Scheme (Package- Management Investments 01) PK-PMU-BIWRMDP-93197- Component B: Water, CW-RFB / Construction of Single Stage - One 2,709,109.5 2021-05- IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,971,014.00 Signed 2019-02-12 2019-03-14 2019-02-17 2019-03-11 2019-03-31 2019-04-15 2019-04-30 2019-07-23 2019-05-28 2019-09-30 Nimmi Perennial Irrigation Envelope 5 27 Management Investments Scheme Page 1 PK-PMU-BIWRMDP-96459- CW-RFB / Construction of Component B: Water, Single Stage - One 2021-06- Gandacha Nurg-Hingri IDA / 58850 Infrastructure and Prior Request for Bids Open - International 8,915,217.00 0.00 Canceled 2019-02-15 2019-02-20 2019-04-03 2019-05-03 2019-06-07 Envelope 06 Integrated Scheme (Package- Management Investments 1) PK-PMU-BIWRMDP-97035- Component B: Water, CW-RFB / Construction of Single Stage - One 5,946,973.3 2021-05- IDA / 58850 Infrastructure and Prior Request for Bids Open - International 7,464,230.00 Signed 2019-02-06 2019-02-11 2019-02-11 2019-02-13 2019-03-25 2019-04-04 2019-04-24 2019-08-21 2019-05-29 2019-09-30 Mushkaf Flood Irrigation Envelope 7 28 Management Investments Schemes PK-PMU-BIWRMDP-104392- CW-RFB / Construction of Component B: Water, Water Supply Scheme for 4 Single Stage - One 2019-12- IDA / 58850 Infrastructure and Post Request for Bids Open - National 775,362.00 0.00 Canceled 2019-03-10 2019-05-27 2019-03-15 2019-04-14 2019-04-15 2019-05-14 2019-06-18 villages within the ambit of Envelope 15 Management Investments Nari Gorge Integrated Scheme, Sibi PK-PMU-BIWRMDP-113051- CW-RFB / Construction of Component B: Water, Single Stage - One 3,642,140.1 2020-03- Gundacha Nurg Hingri IDA / 58850 Infrastructure and Post Request for Bids Open - National 3,477,220.85 Signed 2019-05-15 2019-05-27 2019-05-20 2019-07-01 2019-07-04 2019-07-31 2019-10-08 2019-09-04 2020-04-06 Envelope 5 02 Integrated Scheme - Package Management Investments 2 (Works at Nurg Hingri) PK-PMU-BIWRMDP-73478- CW-RFB / Procurement of Works Yetabad Flood Irrigation Scheme - (Weir and Component B: Water, Single Stage - One 34,997,555.0 2020-09- Conveyance System (KM IDA / 58850 Infrastructure and Prior Request for Bids Open - International 0.00 Canceled 2018-08-30 2018-09-27 2018-11-15 2018-11-15 2018-09-04 2019-01-24 2019-02-23 2019-03-30 Envelope 1 20 0+000 to KM 6+000) and Management Investments Conveyance System and Buildings (KM 6+000 to KM 21+500) PK-PMU-BIWRMDP-93985- CW-RFB / Water Supply Component B: Water, Scheme for three villages Single Stage - One 2020-04- IDA / 58850 Infrastructure and Post Request for Bids Open - National 469,989.00 0.00 Canceled 2019-01-15 2019-03-13 2019-01-20 2019-03-11 2019-02-19 2019-04-15 2019-03-21 2019-04-18 constituting domain of Envelope 17 Management Investments Mushkaf Flood Irrigation Scheme PK-PMU-BIWRMDP-2437-CW- Component B: Water, Single Stage - One 2022-02- RFB / Flood Protection Works IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,408,021.00 0.00 Canceled 2019-11-15 2019-11-22 2019-12-22 2020-01-12 2020-02-25 Envelope 14 - Package 1 of 5 Management Investments PK-PMU-BIWRMDP-2435-CW- RFB / Water Supply Schemes Component B: Water, Single Stage - One 2021-08- Package 2 of 4 - 3 Water IDA / 58850 Infrastructure and Post Request for Bids Open - National 1,842,458.00 0.00 Canceled 2019-11-15 2019-11-22 2019-12-22 2020-01-16 2020-02-29 Envelope 22 Supply Schemes in District Management Investments Loralai PK-PMU-BIWRMDP-2441-CW- RFB / Small Scale Irrigation Component B: Water, Single Stage - One 2021-12- Schemes in District Khuzdar - IDA / 58850 Infrastructure and Post Request for Bids Open - National 268,568.00 0.00 Canceled 2020-03-16 2020-03-23 2020-04-22 2020-05-20 2020-07-03 Envelope 25 Khazeni Bent Perennial Management Investments Irrigation Scheme PK-PMU-BIWRMDP-2439-CW- RFB / Small Scale Irrigation Component B: Water, Single Stage - One 2021-09- Schemes in District Khuzdar - IDA / 58850 Infrastructure and Post Request for Bids Open - National 692,764.00 0.00 Canceled 2019-11-30 2019-12-07 2020-01-06 2020-01-27 2020-03-11 Envelope 02 Naik Mohammad Bent Management Investments Perennial Irrigation Scheme PK-PMU-BIWRMDP-2433-CW- RFB / Drilling & Development Component A: Institutions, Single Stage - One 2021-06- IDA / 58850 Post Request for Bids Open - National 947,550.00 0.00 Canceled 2020-03-16 2020-03-23 2020-04-22 2020-05-13 2020-06-26 of Groundwater Monitoring Capacity and Information Envelope 26 Wells PK-PMU-BIWRMDP-2429-CW- RFB / Nimmi Perennial Component B: Water, Irrigation Scheme - Package 1 Single Stage - One 2022-05- IDA / 58850 Infrastructure and Post Request for Bids Open - National 3,249,665.00 0.00 Canceled 2020-02-20 2020-03-01 2020-03-31 2020-04-21 2020-06-04 of 2 (Construction of Weir, Envelope 25 Management Investments Undersluice, & Head Regulator) PK-PMU-BIWRMDP-2438-CW- Component B: Water, Single Stage - One 2022-02- RFB / Flood Protection Works IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,323,315.00 0.00 Canceled 2019-11-15 2019-11-22 2019-12-22 2020-01-19 2020-03-03 Envelope 21 - Package 2 of 5 Management Investments PK-PMU-BIWRMDP-2430-CW- RFB / Nimmi Perennial Irrigation System - Package 2 of 2 (Construction of Component B: Water, Irrigation Canal System, Guide Single Stage - One 2022-07- IDA / 58850 Infrastructure and Post Request for Bids Open - International 4,924,502.00 0.00 Canceled 2020-03-16 2020-03-26 2020-05-15 2020-06-14 2020-07-28 Banks, Fall Structure, Road Envelope 18 Management Investments Culverts, Outlet Structures, Drainage Box and Pipe Culverts, Regulators and Aquaducts. PK-PMU-BIWRMDP-2434-CW- RFB / Water Supply Schemes Component B: Water, Single Stage - One 2021-06- Package 1 of 4 - Construction IDA / 58850 Infrastructure and Post Request for Bids Open - National 297,186.00 0.00 Canceled 2020-02-29 2020-03-07 2020-04-06 2020-04-27 2020-06-10 Envelope 10 of 3 Water Supply Schemes in Management Investments District Lasbela PK-PMU-BIWRMDP-113054- Component B: Water, CW-RFB / Construction of Single Stage - One 2020-03- IDA / 58850 Infrastructure and Post Request for Bids Open - National 754,691.00 0.00 Canceled 2019-05-15 2019-05-20 2019-07-01 2019-07-31 2019-09-04 Nari Gorge Water Supply Envelope 02 Management Investments Scheme PK-PMU-BIWRMDP-68771- CW-RFB / Construction of Command Area Infrastructure Component B: Water, Viz. WC, WST, KT,EWST, EWC ( Single Stage - One 2021-02- IDA / 58850 Infrastructure and Post Request for Bids Open - National 887,000.00 0.00 Canceled 2020-05-03 2020-05-08 2020-06-19 2020-07-19 2020-08-23 Perennial and Spate)( Package Envelope 19 Management Investments 1 of 3) NARI GORGE PIS COMMAND AREA INFRSTRUCTURE WORKS PK-PMU-BIWRMDP-96461- Component B: Water, CW-RFB / Construction Nari Single Stage - One 2021-06- IDA / 58850 Infrastructure and Prior Request for Bids Open - International 5,268,116.00 0.00 Canceled 2019-02-20 2019-02-11 2019-02-25 2019-02-13 2019-04-08 2019-04-08 2019-05-08 2019-06-12 Gorge Integrated Scheme Envelope 11 Management Investments (Package-2) Page 2 PK-PMU-BIWRMDP-143842- Component B: Water, CW-RFB / Construction Nari Single Stage - One 2020-09- IDA / 58850 Infrastructure and Prior Request for Bids Open - International 5,270,000.00 0.00 Canceled 2019-11-30 2019-12-05 2020-01-16 2020-02-15 2020-03-21 Gorge Integrated Scheme Envelope 17 Management Investments (Package-2) PK-PMU-BIWRMDP-68772- CW-RFB / Construction of Command Aare Component B: Water, Single Stage - One 2021-01- Infrastructures ( Khuskaba IDA / 58850 Infrastructure and Post Request for Bids Open - National 518,000.00 0.00 Canceled 2020-03-30 2020-04-04 2020-05-16 2020-06-15 2020-07-20 Envelope 16 FArming) Package 1 of 10 Management Investments NARI GORGE PIS COMMAND AREA INFRSTRUCTURE WORKS PK-PMU-BIWRMDP-144874- CW-RFB / Works for Construction of Shab-e- Component B: Water, Single Stage - One 2021-12- Maidan Irrigation Scheme IDA / 58850 Infrastructure and Post Request for Bids Open - International 4,683,871.00 0.00 Canceled 2020-03-24 2020-03-29 2020-04-02 2020-05-17 2020-06-21 Envelope 13 Package 1 of 2 - Construction Management Investments of Weir and Main Canal and Related Hydraulic Structures PK-PMU-BIWRMDP-144869- CW-RFB / Works for Construction of Sehan Component B: Water, Single Stage - One 3,524,539.8 2022-03- Irrigation Scheme Package 2 IDA / 58850 Infrastructure and Post Request for Bids Open - National 3,848,000.00 Signed 2020-06-01 2020-11-20 2020-06-06 2020-07-06 2020-12-24 2020-08-05 2021-02-19 2020-09-09 2021-04-26 Envelope 5 03 of 3 - Construction of Main Management Investments Canal and Related Hydraulic Structures PK-PMU-BIWRMDP-144876- CW-RFB / Works for Construction of Shab-e- Component B: Water, Maidan Irrigation Scheme Single Stage - One 3,102,667.0 2022-03- IDA / 58850 Infrastructure and Post Request for Bids Open - International 4,335,483.00 Signed 2020-05-18 2020-08-11 2020-05-23 2020-07-07 2020-09-15 2020-08-06 2020-10-13 2020-09-10 2020-12-15 Package 2 of 2 - Construction Envelope 8 04 Management Investments of Main Canal, Distributories and Related Hydraulic Structures PK-PMU-BIWRMDP-145601- Component B: Water, CW-RFB / Civil Works for Single Stage - One 2021-05- IDA / 58850 Infrastructure and Post Request for Bids Open - National 298,426.00 262,554.67 Signed 2020-01-24 2020-01-28 2020-01-29 2020-02-28 2020-03-02 2020-03-29 2020-04-22 2020-05-03 2020-06-12 Construction of Nari Gorge Envelope 03 Management Investments Water Supply Scheme PK-PMU-BIWRMDP-143841- Component B: Water, Single Stage - One 2021-04- CW-RFB / Civil Works for IDA / 58850 Infrastructure and Post Request for Bids Open - National 267,567.00 182,191.01 Signed 2020-01-24 2020-01-28 2020-01-29 2020-02-01 2020-03-02 2020-03-02 2020-04-22 2020-04-06 2020-06-12 Envelope 05 Mushkaf Water Supply Scheme Management Investments PK-PMU-BIWRMDP-153953- CW-RFB / Construction of Component B: Water, Single Stage - One 3,172,325.3 2022-05- Gundacha Nurg Hingri IDA / 58850 Infrastructure and Post Request for Bids Open - National 3,032,258.00 Signed 2020-02-03 2020-04-30 2020-02-08 2020-03-09 2020-06-10 2020-04-08 2020-06-26 2020-05-13 2020-08-31 Envelope 4 13 Integrated Scheme - Package Management Investments 1 of 2. PK-PMU-BIWRMDP-153957- CW-RFB / Construction of Component B: Water, Single Stage - One 2022-05- Nari Gorge Integrated Scheme IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,709,677.00 0.00 Canceled 2020-01-24 2020-01-28 2020-01-29 2020-02-28 2020-03-02 2020-03-29 2020-04-22 2020-05-03 Envelope 03 - Package 2 of 3 - Lining of Management Investments Khajjak Channels. PK-PMU-BIWRMDP-153960- CW-RFB / Construction of Component B: Water, Single Stage - One 1,965,335.1 2022-05- Nari Gorge Integrated Scheme IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,025,806.00 Signed 2020-01-24 2020-01-28 2020-01-29 2020-02-28 2020-03-02 2020-03-29 2020-04-22 2020-05-03 2020-05-19 Envelope 4 03 - Package 3 of 3 - Management Investments Construction of Arand & Bori Channels PK-PMU-BIWRMDP-153985- CW-RFB / Works for Construction of Sehan Component B: Water, Irrigation Scheme - Package 1 Single Stage - One 3,680,180.3 2022-01- IDA / 58850 Infrastructure and Post Request for Bids Open - International 4,625,806.00 Signed 2020-04-13 2020-08-11 2020-04-18 2020-06-02 2020-09-15 2020-07-02 2020-10-13 2020-08-06 2020-12-15 of 3 - Construction of Weir, Envelope 1 28 Management Investments Undersluice, Head Regulator, Guide Bunds, Main Canal and Related Structures PK-PMU-BIWRMDP-159126- CW-RFB / Works for Plant Production Through Raising of Nurseries and Other Allied Component B: Water, Activities under B2 Sub Single Stage - One 2020-12- IDA / 58850 Infrastructure and Post Request for Bids Open - National 300,645.00 0.00 Canceled 2020-02-28 2020-02-24 2020-03-04 2020-04-15 2020-05-15 2020-06-19 Component Of BIWRMDP Envelope 16 Management Investments Second Phase For Following LOTs. LOT 4 – DADAR LOT 5 – HARNAI LOT 6 - SIBI Lot 7 - Uthal Lot 8 – Khuzdar PK-PMU-BIWRMDP-133752- CW-RFQ / Works for Plant Production Through Raising of Nurseries and Other Allied Activities under B2 Sub component Of BIWRMDP Component B: Water, Single Stage - One 2020-08- Second Phase For Following IDA / 58850 Infrastructure and Post Request for Bids Open - National 300,645.00 0.00 Canceled 2019-10-15 2019-11-16 2019-10-20 2019-12-01 2019-12-23 2019-12-31 2020-02-10 2020-02-04 Envelope 02 LOTs. Management Investments LOT 4 – DADAR LOT 5 – HARNAI LOT 6 - SIBI Lot 7 -Uthal Lot 8 - Khuzdar PK-PMU-BIWRMDP-144858- GO-RFB / Civil Works for Construction of Measurement Component A: Institutions, Single Stage - One 2021-01- Weir / Flume and Guard IDA / 58850 Post Request for Bids Open - National 451,612.00 0.00 Canceled 2020-02-17 2020-02-22 2020-03-23 2020-04-22 2020-05-27 Capacity and Information Envelope 22 Houses as part of Establishing Phase-I of Hydro-met Network. PK-PMU-BIWRMDP-159162- CW-RFQ / Civil Works for Component B: Water, Request for Single Stage - One 2020-09- Plantation at Nari Gorge and IDA / 58850 Infrastructure and Post Open - National 45,500.00 23,101.38 Signed 2020-02-22 2020-03-27 2020-06-18 Quotations Envelope 23 Mushkaf Integrated Schemes Management Investments in Nari River Basin Page 3 PK-PMU-BIWRMDP-167783- CW-RFB / Lining of Water Courses in Command Area of Nari Gorge Integrated Scheme - Lot-1 & Lot-2 with following detail: Component B: Water, Single Stage - One 2021-07- Lot-1: Water Courses at IDA / 58850 Infrastructure and Post Request for Bids Open - National 795,180.00 745,887.52 Signed 2020-04-13 2020-04-23 2020-04-18 2020-05-18 2020-06-05 2020-06-17 2020-08-28 2020-07-22 2020-11-06 Envelope 21 Bakhra S.Khan & Ghulam Management Investments Bolak, Gullu Shaher, Luni & Sib Jarib Lot-2: Water Courses at Khajjak, Kurak, Mazre & Marghazani PK-PMU-BIWRMDP-171492- CW-RFB / Works for Plant Production Through Raising of Nurseries and Other Allied Component B: Water, Activities under B2 Sub Single Stage - One 2021-08- IDA / 58850 Infrastructure and Post Request for Bids Open - National 300,645.00 295,921.80 Signed 2020-05-04 2020-05-01 2020-05-09 2020-06-08 2020-06-10 2020-07-08 2020-08-10 2020-08-12 2020-09-25 Component Of BIWRMDP Envelope 11 Management Investments Second Phase For Following LOTs. LOT 4 – DADAR LOT 5 – HARNAI LOT 6 - SIBI Lot 7 - Uthal Lot 8 – Khuzdar PK-PMU-BIWRMDP-172748- CW-RFB / Construction of Component B: Water, Single Stage - One 2,880,032.8 2022-05- Nari Gorge Integrated Scheme IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,593,750.00 Signed 2020-05-09 2020-05-10 2020-05-11 2020-06-10 2020-06-10 2020-07-10 2020-06-26 2020-08-14 2020-09-05 Envelope 6 06 Package 2 of 3 - Lining of Management Investments Khajjak Channels PK-PMU-BIWRMDP-144866- CW-RFB / Works for Construction of Sehan Irrigation Scheme - Lot No.1 Component B: Water, Single Stage - One 2021-03- Construction of Weir, IDA / 58850 Infrastructure and Post Request for Bids Open - National 4,567,000.00 0.00 Canceled 2020-05-29 2020-06-03 2020-07-15 2020-08-14 2020-09-18 Envelope 17 Undersluice, Head Regulator, Management Investments Guide Bunds, Main Canal and Related Structures - Civil Works PK-PMU-BIWRMDP-144870- CW-RFB / Works for Construction of Sehan Irrigation Scheme Package 3 Component B: Water, of 3 - Construction of Dis Single Stage - One 3,290,941.2 2022-05- IDA / 58850 Infrastructure and Post Request for Bids Open - National 3,680,358.00 Signed 2020-11-05 2020-11-20 2020-11-10 2020-12-10 2020-12-24 2020-12-30 2021-02-19 2021-02-11 2021-05-07 tributaries & Related Envelope 5 07 Management Investments Hydraulic Structures and Augmentation of Potable Water Supply System of Mekhtar Town PK-PMU-BIWRMDP-203186- CW-RFB / Works for Construction of Shab-e- Component B: Water, Under Single Stage - One 3,878,812.1 2022-05- Maidan Irrigation Scheme IDA / 58850 Infrastructure and Post Request for Bids Open - National 3,850,662.00 Implementat 2020-11-05 2020-11-20 2020-11-10 2020-12-10 2020-12-24 2020-12-30 2021-02-19 2021-02-11 Envelope 0 07 Package 1 of 2 - Construction Management Investments ion of Weir, Main Canal & Related Hydraulic Structures PK-PMU-BIWRMDP-143843- CW-RFB / Works for dry- afforestation, rangeland Component B: Water, Single Stage - One 2022-05- improvement through water IDA / 58850 Infrastructure and Post Request for Bids Open - National 525,078.00 569,125.61 Signed 2020-11-05 2020-11-20 2020-11-10 2020-12-10 2020-12-24 2020-12-30 2020-12-24 2021-02-11 2021-04-22 Envelope 07 harvesting structures and Management Investments plantation/ sowing Package 1 - Nari River Basin PK-PMU-BIWRMDP-203187- CW-RFB / Works for dry- afforestation, rangeland Component B: Water, Single Stage - One 2022-05- improvement through water IDA / 58850 Infrastructure and Post Request for Bids Open - National 681,818.00 778,316.75 Signed 2020-11-05 2020-11-20 2020-11-10 2020-12-10 2020-12-24 2020-12-30 2020-12-24 2021-02-11 2021-04-22 Envelope 07 harvesting structures and Management Investments plantation/ sowing Package 2 - Porali River Basin PK-PMU-BIWRMDP-206305- CW-RFB / Construction of Component B: Water, Pending Single Stage - One 2021-10- Lined Water Courses for Nari IDA / 58850 Infrastructure and Post Request for Bids Open - National 285,000.00 0.00 Implementat 2020-12-15 2020-12-20 2021-01-31 2021-03-02 2021-04-06 Envelope 03 Basin (Narigurage) package 2 Management Investments ion 0f 2 PK-PMU-BIWRMDP-206297- CW-RFB / Construction of Component B: Water, Pending Water storage Tanks and Single Stage - One 2021-09- IDA / 58850 Infrastructure and Post Request for Bids Open - National 730,348.00 0.00 Implementat 2020-12-15 2020-12-20 2021-01-19 2021-02-18 2021-03-25 Katcha Tracks for Nari Basin Envelope 21 Management Investments ion Package 1 of 2 (Nari Gorge & Mushkaf) PK-PMU-BIWRMDP-206302- CW-RFB / Construction of Component B: Water, Under Water Storage Tanks and Single Stage - One 2021-09- IDA / 58850 Infrastructure and Post Request for Bids Open - National 557,156.00 48,418.63 Implementat 2020-12-15 2020-12-14 2020-12-20 2021-01-19 2021-01-18 2021-02-18 2021-04-23 2021-03-25 Katcha Tracks for Poralis Envelope 21 Management Investments ion Basin Package 1 of 2 (Gundacha-Nimmi) PK-PMU-BIWRMDP-213890- Component B: Water, Pending CW-RFB / Construction of Single Stage - One 2022-06- IDA / 58850 Infrastructure and Post Request for Bids Open - National 1,313,787.00 0.00 Implementat 2021-01-18 2021-01-23 2021-02-22 2021-03-15 2021-04-19 Flood Protection Works at Envelope 13 Management Investments ion Porali River Basin PK-PMU-BIWRMDP-213891- CW-RFB / Construction of Component B: Water, Pending Single Stage - One 2022-06- Flood Protection Works at Nari IDA / 58850 Infrastructure and Post Request for Bids Open - National 1,519,027.00 0.00 Implementat 2021-01-25 2021-01-30 2021-03-01 2021-03-22 2021-04-26 Envelope 20 River Basin - Package 1, Management Investments ion Works at Tariqabad PK-PMU-BIWRMDP-206313- Component B: Water, Pending CW-RFB / Civil Works Single Stage - One 2022-05- IDA / 58850 Infrastructure and Post Request for Bids Open - National 1,161,795.00 0.00 Implementat 2021-02-10 2021-02-15 2021-03-29 2021-04-28 2021-06-02 Construction of Check dams Envelope 01 Management Investments ion for Porali Basin package 2 of 2 PK-PMU-BIWRMDP-220308- Component B: Water, Pending CW-RFB / Civil Works for Single Stage - One 2022-06- IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,848,402.00 0.00 Implementat 2021-02-24 2021-03-01 2021-03-31 2021-04-30 2021-06-04 Construction of Sibi Town Envelope 04 Management Investments ion Water Supply Scheme Page 4 PK-PMU-BIWRMDP-223765- CW-RFB / Procurement of Component B: Water, Pending Single Stage - One 2022-06- Works for Construction of IDA / 58850 Infrastructure and Post Request for Bids Open - National 2,380,000.00 0.00 Implementat 2021-03-25 2021-03-30 2021-04-29 2021-05-29 2021-06-29 Envelope 29 Perennial Irrigation Schemes Management Investments ion of District Khuzdar PK-PMU-BIWRMDP-233709- Request for Bids - Component B: Water, Pending CW-RFB / Lining of water Single Stage - One Small Works SPD 2022-07- IDA / 58850 Infrastructure and Post Request for Bids Open - National 278,823.00 0.00 Implementat 2021-06-07 2021-06-12 2021-07-12 2021-08-05 2021-09-09 courses at Nimmi & Gundacha Envelope (1 envelope 06 Management Investments ion Irrigation Schemes process) PK-PMU-BIWRMDP-233885- Request for Bids - CW-RFB / Construction of Component B: Water, Single Stage - One Small Works SPD 2022-07- Terracing System for Water IDA / 58850 Infrastructure and Post Request for Bids Open - National 212,034.00 0.00 Canceled 2021-05-31 2021-06-05 2021-07-05 2021-08-04 2021-09-08 Envelope (1 envelope 05 Harvesting at Nari Gorge and Management Investments process) Mushkaf Schemes PK-PMU-BIWRMDP-237314- CW-RFB / Construction of earthen water courses & structures, earthen water storage reservoirs and terracing system Request for Bids - Component B: Water, Pending Lot 1-Nimmi, Gundacha Single Stage - One Small Works SPD 2022-06- IDA / 58850 Infrastructure and Post Request for Bids Open - National 901,489.00 0.00 Implementat 2021-06-08 2021-06-13 2021-07-13 2021-08-03 2021-09-17 Schemes Envelope (1 envelope 14 Management Investments ion process) Lot 2-Nari Gorge & Mushkaf Schemes (water courses & reservoirs) Lot 3 - Contour Terracing at Nari Gorge & Mushkaf PK-PMU-BIWRMDP-237316- Request for Bids - CW-RFB / Civil Works for Component B: Water, Pending Single Stage - One Small Works SPD 2022-06- Construction of Water Supply IDA / 58850 Infrastructure and Post Request for Bids Open - National 205,098.00 0.00 Implementat 2021-06-08 2021-06-13 2021-07-13 2021-08-03 2021-08-24 Envelope (1 envelope 20 Scheme for Nimmi and Management Investments ion process) Gundacha PK-PMU-BIWRMDP-206310- Request for Bids - Component B: Water, Pending CW-RFB / Civil Works for Single Stage - One Small Works SPD 2022-06- IDA / 58850 Infrastructure and Post Request for Bids Open - National 1,349,953.00 0.00 Implementat 2021-06-08 2021-06-13 2021-07-13 2021-08-03 2021-09-17 Construction of Check Dams Envelope (1 envelope 14 Management Investments ion at Nari Basin Package 1 of 2 process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PMU-BIWRMDP-2336-GO- RFQ / Office Equipment for Component C: Project PMU - Desktops, laptops, Request for Single Stage - One IDA / 58850 Management and Technical Prior Open - National 50,000.00 49,337.27 Signed 2016-10-08 2016-11-03 2016-11-01 2016-12-03 printers, scanners, cameras, Quotations Envelope Assistance internet devices, multimedia etc. PK-PMU-BIWRMDP-2338-GO- RFQ / Furniture & Fixture for Component C: Project Request for Single Stage - One PMU at Quetta including IDA / 58850 Management and Technical Post Open - National 34,299.00 39,744.82 Completed 2016-10-27 2016-11-29 2016-11-28 2016-12-27 2017-01-10 Quotations Envelope Reversible Split AC for PD Assistance Office PK-PMU-BIWRMDP-2406-GO- Component C: Project Request for Single Stage - One RFQ / Procurement of Diesel IDA / 58850 Management and Technical Post Open - National 15,314.00 19,553.87 Completed 2016-11-14 2016-12-14 2017-04-20 2017-01-13 2017-05-03 Quotations Envelope Generator for PMU Assistance PK-PMU-BIWRMDP-2413-GO- Component C: Project Request for Single Stage - One RFQ / Furniture & Fixture for IDA / 58850 Management and Technical Post Open - National 25,842.00 27,052.71 Completed 2016-11-18 2016-12-24 2017-03-06 2017-01-23 2017-05-04 Quotations Envelope PIUs at Sibi & Uthal Assistance PK-PMU-BIWRMDP-2414-GO- RFQ / Field Equipment - Component C: Project Relaskops, Clinometers, Request for Single Stage - One IDA / 58850 Management and Technical Post Open - National 21,535.00 25,063.67 Signed 2016-12-09 2017-01-12 2017-12-22 2017-02-11 Range Finders, Level Machines Quotations Envelope Assistance etc. for Watershed & Rangeland Management PK-PMU-BIWRMDP-2415-GO- Component C: Project RFQ / Procurement of Video Request for Single Stage - One IDA / 58850 Management and Technical Post Open - National 12,443.00 13,146.03 Completed 2016-11-10 2016-12-14 2017-05-17 2017-01-13 2017-06-18 Conference Equipment for Quotations Envelope Assistance PMU PK-PMU-BIWRMDP-2417-GO- Component C: Project Request for Single Stage - One RFQ / Purchase of Computer IDA / 58850 Management and Technical Post Open - National 47,856.00 29,805.88 Signed 2016-11-30 2017-01-21 2018-01-15 2017-02-26 Quotations Envelope Software - GIS & Autocad Assistance PK-PMU-BIWRMDP-14395- Component C: Project GO-RFQ / Purchase of Office Request for Single Stage - One IDA / 58850 Management and Technical Post Open - National 72,000.00 72,486.33 Signed 2017-05-11 2017-06-02 2017-06-15 2017-06-30 Equipment for PMU & PIUs at Quotations Envelope Assistance Sibi & Uthal PK-PMU-BIWRMDP-14456- GO-RFQ / Purchase of Split Component C: Project Request for Single Stage - One Air Conditioners, Refrigerators IDA / 58850 Management and Technical Post Open - National 50,500.00 40,052.89 Signed 2017-05-12 2017-06-05 2017-11-23 2017-07-05 Quotations Envelope etc for PMU & PIUs and Diesel Assistance Generators for PIUS PK-PMU-BIWRMDP-18626- NC-RFQ / Purchase of Component C: Project Request for Single Stage - One Software - MS Office, Adobe IDA / 58850 Management and Technical Post Open - National 29,400.00 25,688.50 Signed 2017-08-02 2017-09-01 2018-01-15 2017-10-16 Quotations Envelope Pro, Microsoft Project, Assistance Autocad Civil 3D etc. PK-PMU-BIWRMDP-18629- Component C: Project Request for Single Stage - One GO-RFQ / Special Desktop IDA / 58850 Management and Technical Post Open - National 9,375.00 7,467.27 Signed 2017-08-05 2017-09-08 2018-01-15 2017-10-23 Quotations Envelope Computers for Arc GIS Assistance Page 5 PK-PMU-BIWRMDP-2409-GO- Component C: Project RFQ / Procurement of Office Request for Single Stage - One IDA / 58850 Management and Technical Post Open - National 43,070.00 0.00 Canceled 2016-11-21 2016-12-25 2017-01-24 Equipment & Generators for Quotations Envelope Assistance PIUs at Sibi & Uthal PK-PMU-BIWRMDP-34361- Component B: Water, GO-RFQ / Procurement of Request for Single Stage - One IDA / 58850 Infrastructure and Post Open - National 20,000.00 7,284.88 Signed 2017-11-20 2018-01-15 2018-01-10 2018-07-14 Furniture for Agriculture Field Quotations Envelope Management Investments Office PK-PMU-BIWRMDP-34363- Component B: Water, GO-RFQ / Procurement of IT Request for Single Stage - One IDA / 58850 Infrastructure and Post Open - National 18,000.00 11,234.74 Signed 2017-11-20 2018-01-15 2018-01-15 2018-05-15 Equipment for Agriculture Quotations Envelope Management Investments Field Offices PK-PMU-BIWRMDP-34364- Component B: Water, Request for Single Stage - One GO-RFQ / Procurement of IDA / 58850 Infrastructure and Post Open - National 80,000.00 39,815.82 Signed 2017-11-20 2018-01-15 2018-01-05 2018-05-15 Quotations Envelope Survey Equipment Management Investments PK-PMU-BIWRMDP-2408-GO- Component C: Project RFQ / Procurement of Request for Single Stage - One IDA / 58850 Management and Technical Prior Open - National 71,784.00 0.00 Canceled 2016-12-07 2017-01-26 2017-04-26 Additional Vehicles for Project Quotations Envelope Assistance - 3 Door Jeeps PK-PMU-BIWRMDP-2418-GO- RFB / Supply/ installation of Hdyro-meteorological observation stations, rain Component A: Institutions, Single Stage - One gauging stations, stream IDA / 58850 Post Request for Bids Open - International 2,692,000.00 0.00 Canceled 2017-11-19 2017-11-29 2018-01-20 2018-02-19 2018-03-22 2019-09-13 Capacity and Information Envelope gauging stations and groundwater observation wells including establishment of Data Centre PK-PMU-BIWRMDP-96456- GO-RFB / Establishment of Pending Hydro-met networks Pilot Component A: Institutions, Single Stage - One IDA / 58850 Post Request for Bids Open - National 770,000.00 0.00 Implementati 2019-02-11 2019-02-16 2019-03-18 2019-04-17 2019-05-22 2020-05-21 Project (Hydro-met Data Capacity and Information Envelope on Collection and Management System) PK-PMU-BIWRMDP-153962- GO-RFB / Procurement of Component B: Water, Single Stage - One Goods for Construction of IDA / 58850 Infrastructure and Post Request for Bids Open - National 406,451.00 341,590.17 Signed 2020-03-05 2020-05-10 2020-03-10 2020-04-09 2020-06-10 2020-05-09 2020-08-08 2020-06-13 2020-09-25 2021-02-08 Envelope Nari Gorge Water Supply Management Investments Scheme PK-PMU-BIWRMDP-153979- Component B: Water, GO-RFB / Procurement of Single Stage - One IDA / 58850 Infrastructure and Post Request for Bids Open - National 198,806.00 207,540.98 Signed 2020-03-05 2020-05-07 2020-03-10 2020-04-09 2020-06-10 2020-05-09 2020-08-08 2020-06-13 2020-09-25 2021-02-08 Goods for Construction of Envelope Management Investments Mushkaf Water Supply Scheme PK-PMU-BIWRMDP-159160- GO-RFQ / Purchase of Plants Component B: Water, Request for Single Stage - One for Plantation at Nari Gorge IDA / 58850 Infrastructure and Post Open - National 26,000.00 23,717.20 Signed 2020-02-22 2020-03-27 2020-05-29 2020-09-23 Quotations Envelope and Mushkaf Integrated Management Investments Schemes of Nari River Basin PK-PMU-BIWRMDP-166190- GO-DIR / Procurement of Goods Pkg 2: : Lot 1,Mobile X- Ray Machines with CR-System Component A: Institutions, / DR-Based Mobil X-Ray IDA / 58850 Post Direct Selection Direct 2,017,164.00 1,759,284.64 Signed 2020-03-30 2020-03-25 2020-04-04 2020-04-03 2020-05-09 2020-07-22 2020-11-05 2020-08-21 Capacity and Information Machines along with Dry Laser Imagers, Lot 2, Patient Monitors,Lot 3, ICU Ventilators PK-PMU-BIWRMDP-187938- GO-RFQ / Procurement of Component C: Project Miscellaneous Furniture and Request for Single Stage - One IDA / 58850 Management and Technical Post Open - National 11,500.00 11,233.61 Signed 2020-08-21 2020-09-26 2021-01-11 2020-11-10 Equipment e.g Storage Quotations Envelope Assistance Cabinets, Voltage Stabilizer, LED TV etc. PK-PMU-BIWRMDP-166183- GO-DIR / Procurement of Goods Package No: 1 Full Fowler Hospital Motorized/ Manual Beds along Component A: Institutions, with following Accessories: a) IDA / 58850 Post Direct Selection Direct 73,760.00 0.00 Canceled 2020-03-30 2020-04-04 2020-05-09 2020-11-05 Capacity and Information Mattress b) IV Pole (Separate / Built-In) c) Over Head Table d) Bed Side Locker e) Bed Side Screen f)Patient Footstep g) Pillow & Cover PK-PMU-BIWRMDP-135510- GO-RFB / Procurement of Goods for Establishment of Hydro-met Network Phase-I - Under Lot No 1. Design, supply and Component A: Institutions, Single Stage - One IDA / 58850 Post Request for Bids Open - International 493,103.00 0.00 Implementati 2020-11-09 2020-12-14 2020-11-14 2020-12-15 2020-12-29 2021-01-28 2021-03-12 2021-11-07 installation of 9 No Automatic Capacity and Information Envelope on Stations, Lot No.2 Design, supply and installation of 2 No Stream flow Gauging Stations PK-PMU-BIWRMDP-206307- Component B: Water, Under GO-RFB / Goods: Procurement Single Stage - One IDA / 58850 Infrastructure and Post Request for Bids Open - National 250,000.00 252,492.44 Implementati 2020-12-15 2020-12-14 2020-12-20 2021-01-19 2021-01-18 2021-02-18 2021-04-23 2021-03-25 2021-09-21 of PVC Pipelines forPorali Envelope Management Investments on Basin (Gundacha-Nimmi) PK-PMU-BIWRMDP-233693- GO-RFB / Purchase and laying Component B: Water, Pending Single Stage - One of PVC Pipe at Nari Gorge, IDA / 58850 Infrastructure and Post Request for Bids Open - National 458,412.00 0.00 Implementati 2021-05-31 2021-06-05 2021-07-05 2021-07-29 2021-09-02 2022-06-29 Envelope Mushkaf & Sehan Irrigation Management Investments on Schemes. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 6 PK-PMU-BIWRMDP-2442-NC- RFQ / Project Website Design Component C: Project Development, Domain Request for Single Stage - One IDA / 58850 Management and Technical Post Open - National 2,400.00 2,943.83 Signed 2016-10-20 2016-11-26 2016-11-16 2017-01-10 Registration, Hosting, Quotations Envelope Assistance Maintenance and Updating fro One Year PK-PMU-BIWRMDP-18623- NC-DIR / Purchase of 0.3m to Component C: Project 0.5m Resolution Satellite IDA / 58850 Management and Technical Post Direct Selection Direct 54,600.00 0.00 Canceled 2017-07-26 2017-10-25 2017-07-31 2017-11-06 2017-08-25 2017-10-09 Image for Nari Gorge & Assistance Gundacha Area. PK-PMU-BIWRMDP-19640- Component C: Project NC-DIR / Purchase of Arc GIS IDA / 58850 Management and Technical Post Direct Selection Direct 30,563.00 0.00 Canceled 2017-07-19 2017-10-26 2017-07-24 2017-08-15 2017-09-29 - Two Basic & One Standard Assistance Version PK-PMU-BIWRMDP-38144- NC-RFQ / Baseline Component C: Project Request for Single Stage - One sampling(Laboratory Testing) IDA / 58850 Management and Technical Post Open - National 6,000.00 28,014.89 Signed 2018-01-05 2018-03-02 2018-01-04 2018-05-01 Quotations Envelope of two integrated schemes for Assistance ESMP PK-PMU-BIWRMDP-45893- NC-RFQ / Baseline Sampling(Laboratory Testing) Component B: Water, Request for Single Stage - One (Ambient IDA / 58850 Infrastructure and Post Open - National 35,000.00 57,805.06 Signed 2018-02-01 2018-02-27 2018-02-21 2018-03-15 Quotations Envelope Air/Noise/Water/Soil) for Nur- Management Investments Hingri-Gunacha Irrigation Scheme Scheme for ESMP PK-PMU-BIWRMDP-68865- NC-RFQ / Procurement of Demo Plots (PLL, HEIS, Component B: Water, Livestock, Tunnel farming, Request for Single Stage - One IDA / 58850 Infrastructure and Post Open - National 95,500.00 0.00 Canceled 2019-11-20 2020-01-15 2020-07-13 nurseries, crops) First Lot Quotations Envelope Management Investments GUNDACHA & NARI GUARGE PIS COMMAND AREA INFRSTRUCTURE PK-PMU-BIWRMDP-144898- Component C: Project Pending NC-RFQ / PROCUREMENT OF Request for Single Stage - One IDA / 58850 Management and Technical Post Open - National 30,000.00 0.00 Implementati 2020-03-03 2020-03-26 2020-09-22 FINANCIAL/ACCOUNTING & Quotations Envelope Assistance on PAYROLL SOFTWARE PK-PMU-BIWRMDP-65562- NC-RFQ / Environmental Component C: Project Request for Single Stage - One Baseline studies (Laboratory IDA / 58850 Management and Technical Post Open - National 100,000.00 81,189.59 Signed 2020-02-05 2020-04-01 2020-08-19 2020-09-28 Quotations Envelope Testing) for different schemes Assistance regarding ESMPs & Checklists PK-PMU-BIWRMDP-190066- CW-DIR / Mangroves Component B: Water, Restoration and Plantation in IDA / 58850 Infrastructure and Post Direct Selection Direct 117,420.00 115,335.95 Signed 2020-09-29 2020-10-09 2020-10-01 2020-10-14 2020-10-16 2021-03-29 2021-10-16 MianiHor (Coastal Area of Management Investments Porali River Basin) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PMU-BIWRMDP-2240-CS- Component C: Project QCBS / Project Supervision & Quality And Cost- IDA / 58850 Management and Technical Prior Open - International 8,824,655.00 9,592,440.89 Signed 2016-10-18 2016-11-20 2016-11-13 2016-11-23 2016-11-30 2017-04-05 2017-01-05 2017-05-29 2017-02-04 2017-08-29 2017-03-04 2017-09-21 2017-04-03 2017-11-30 2022-10-31 Implementation Assistance Based Selection Assistance Consultancy PK-PMU-BIWRMDP-2335-CS- Component C: Project Consultant CQS / Hiring Accountancy IDA / 58850 Management and Technical Post Qualification Open - National 103,369.00 180,643.38 Signed 2016-11-15 2017-02-10 2016-12-13 2017-01-06 2017-05-16 2017-01-31 2017-07-18 2017-02-24 2017-10-11 2022-10-31 Firm for Quarterly Internal Assistance Selection Audit PK-PMU-BIWRMDP-2245-CS- Component C: Project Quality And Cost- QCBS / Monitoring & IDA / 58850 Management and Technical Prior Open - International 1,758,231.00 0.00 Canceled 2016-10-24 2017-01-03 2016-11-21 2017-02-26 2016-12-15 2017-01-20 2017-02-19 2017-03-19 2017-04-22 2022-10-30 Based Selection Evaluation Consultancy Assistance PK-PMU-BIWRMDP-2334-CS- Component C: Project Consultant INDV / Hiring of Accountancy IDA / 58850 Management and Technical Prior Qualification Open - National 4,786.00 4,173.09 Signed 2016-10-27 2017-02-23 2016-11-21 2016-12-15 2017-08-07 2016-12-25 2017-09-12 2017-01-14 2017-09-22 2017-02-13 Firm for External Audit of Assistance Selection Retroactive Financing PK-PMU-BIWRMDP-50078-CS- CQS / HIRING A CONSULTING Component C: Project Consultant FIRM FOR THE PREPARATION IDA / 58850 Management and Technical Post Qualification Open - National 170,000.00 0.00 Canceled 2018-03-15 2018-03-14 2018-04-05 2018-05-19 2018-06-18 2018-07-23 2019-01-19 OF CULTURAL HERITAGE Assistance Selection MANAGEMENT PLAN (CHMP) PK-PMU-BIWRMDP-109329- CS-CQS / Hiring of Audit Firm Component C: Project Consultant to Carryout Special Audit of IDA / 58850 Management and Technical Post Qualification Open - National 10,000.00 2,437.30 Signed 2019-04-08 2019-04-11 2019-04-23 2019-05-10 2019-05-01 2019-05-17 2019-05-01 2019-05-21 2019-05-03 2019-06-04 Project Supervision & Assistance Selection Implementation Assistance Consultants PK-PMU-BIWRMDP-2250-CS- Component C: Project Quality And Cost- QCBS / Institutional Reforms IDA / 58850 Management and Technical Post Open - International 765,697.00 0.00 Canceled 2018-10-15 2018-11-14 2018-12-15 2019-01-29 2019-02-23 2019-03-30 2019-04-30 2020-04-29 Based Selection Consultants Assistance PK-PMU-BIWRMDP-135514- Component C: Project Least Cost CS-LCS / Hiring Monitoring & IDA / 58850 Management and Technical Post Open - National 550,000.00 0.00 Canceled 2019-10-15 2019-11-05 2019-12-19 2020-01-16 2020-02-15 2020-03-21 2020-04-25 2020-10-22 Selection Evaluation Consultancy Assistance INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 7 PK-PMU-BIWRMDP-2315-CS- Component C: Project Individual INDV / Social Safeguards IDA / 58850 Management and Technical Post Consultant Open 103,369.00 4,178.54 Terminated 2016-10-28 2016-12-08 2016-12-18 2017-04-10 2016-12-25 2017-04-24 2017-01-06 2017-04-25 2022-10-31 Specialist Assistance Selection PK-PMU-BIWRMDP-2317-CS- Component C: Project Individual INDV / Communications IDA / 58850 Management and Technical Post Consultant Open 33,021.00 3,132.42 Terminated 2016-10-28 2016-12-08 2016-12-24 2017-05-17 2016-12-31 2017-01-12 2017-05-17 2022-10-31 Specialist Assistance Selection PK-PMU-BIWRMDP-2319-CS- Component C: Project Individual INDV / Water Resources IDA / 58850 Management and Technical Post Consultant Open 87,864.00 6,323.39 Terminated 2016-10-28 2017-01-04 2017-01-11 2017-01-23 2017-12-20 2022-10-31 Specialist Assistance Selection Component C: Project Individual PK-PMU-BIWRMDP-2320-CS- IDA / 58850 Management and Technical Post Consultant Open 87,864.00 3,613.37 Terminated 2016-11-21 2016-12-08 2017-01-07 2017-10-20 2017-01-14 2017-10-20 2017-01-26 2017-10-23 2022-10-31 INDV / Agriculture Specialist Assistance Selection PK-PMU-BIWRMDP-2321-CS- Component C: Project Individual INDV / Environmental IDA / 58850 Management and Technical Post Consultant Open 86,141.00 3,611.41 Terminated 2016-10-28 2016-12-08 2016-12-30 2017-07-10 2017-01-06 2017-07-05 2017-01-18 2017-07-14 2022-10-31 Safeguards Specialist Assistance Selection PK-PMU-BIWRMDP-2325-CS- Component C: Project Individual INDV / Monitoring & IDA / 58850 Management and Technical Post Consultant Open 117,152.00 1,993.36 Terminated 2016-11-21 2016-12-08 2017-01-30 2017-02-06 2017-04-13 2017-02-18 2017-05-02 2022-10-31 Evaluation Specialist Assistance Selection PK-PMU-BIWRMDP-2326-CS- Component C: Project Individual INDV / Matching Grant IDA / 58850 Management and Technical Post Consultant Open 86,141.00 2,184.24 Terminated 2016-11-21 2016-12-08 2017-01-25 2017-04-17 2017-02-01 2017-04-20 2017-02-13 2017-04-27 2022-10-31 2018-09-15 Specialist Assistance Selection PK-PMU-BIWRMDP-2332-CS- Component C: Project Individual INDV / Gender Development IDA / 58850 Management and Technical Post Consultant Open 51,685.00 2,183.20 Terminated 2016-11-21 2016-12-08 2017-01-13 2017-09-25 2017-01-20 2017-02-01 2017-10-03 2022-10-31 Specialist Assistance Selection Component C: Project Individual PK-PMU-BIWRMDP-2333-CS- IDA / 58850 Management and Technical Post Consultant Open 68,338.00 0.00 Canceled 2016-11-21 2016-12-08 2017-02-09 2017-02-16 2017-02-28 2022-10-31 INDV / Livestock Specialist Assistance Selection Component C: Project Individual PK-PMU-BIWRMDP-2318-CS- IDA / 58850 Management and Technical Prior Consultant Open 117,152.00 0.00 Canceled 2016-10-27 2016-12-01 2016-12-11 2016-12-18 2016-12-30 2022-10-30 INDV / Procurement Specialist Assistance Selection PK-PMU-BIWRMDP-19626-CS- Component C: Project Individual INDV / Hiring of Procurement IDA / 58850 Management and Technical Post Consultant Open 275,071.00 3,320.53 Terminated 2017-07-14 2017-09-01 2017-08-16 2017-08-14 2017-08-30 2017-09-29 2017-09-14 2017-09-29 2022-11-06 Specialist Assistance Selection PK-PMU-BIWRMDP-2308-CS- Component C: Project Individual INDV / Financial Management IDA / 58850 Management and Technical Prior Consultant Open 116,769.00 0.00 Canceled 2016-10-08 2016-10-29 2016-11-09 2016-11-08 2016-11-15 2016-11-18 2022-11-01 Specialist at Project Assistance Selection Management Unit Quetta PK-PMU-BIWRMDP-26486-CS- Component C: Project Individual INDV / Hiring of Financial IDA / 58850 Management and Technical Post Consultant Open 285,714.00 29,917.08 Terminated 2017-09-07 2017-07-28 2017-10-03 2016-11-23 2017-10-10 2016-11-23 2017-10-22 2016-11-22 2022-10-31 Management Specialist Assistance Selection PK-PMU-BIWRMDP-38131-CS- Component C: Project Individual CDS / Hiring of Individual IDA / 58850 Management and Technical Post Consultant Limited 3,000.00 26,196.92 Signed 2017-11-27 2017-11-30 2017-12-02 2017-12-07 2017-12-22 2017-12-15 2017-12-27 2018-01-15 Consultant(Environmental Assistance Selection Specialist) for short term PK-PMU-BIWRMDP-7458-CS- Individual INDV / Hiring of Hydrologist Component A: Institutions, IDA / 58850 Post Consultant Open 50,000.00 0.00 Canceled 2017-03-01 2017-04-19 2017-05-10 2017-06-14 2017-11-11 for Design of Hydro-met Capacity and Information Selection Network PK-PMU-BIWRMDP-2323-CS- Component C: Project Individual INDV / Training Management IDA / 58850 Management and Technical Post Consultant Open 72,358.00 0.00 Canceled 2016-11-21 2016-12-08 2017-01-19 2017-01-26 2017-02-07 2022-10-31 Specialist Assistance Selection PK-PMU-BIWRMDP-60509-CS- Component C: Project Individual INDV / Hiring of IDA / 58850 Management and Technical Post Consultant Open 80,000.00 0.00 Canceled 2018-04-24 2018-06-12 2018-07-03 2018-08-07 2019-02-03 Environmental Safeguard Assistance Selection Specialist PK-PMU-BIWRMDP-61675-CS- INDV / Hiring of Individual Individual Component A: Institutions, Consultant for National IDA / 58850 Prior Consultant Direct 9,000.00 0.00 Canceled 2018-05-04 2018-05-04 2018-05-06 2018-05-07 2018-05-08 2018-05-22 Capacity and Information Consultative Workshop foe Selection Establishment of BWRMA PK-PMU-BIWRMDP-61884-CS- INDV / Hiring of Individual Consultant to Facilitate in Individual Holding of National Component A: Institutions, IDA / 58850 Post Consultant Direct 9,000.00 7,341.82 Completed 2018-05-08 2018-05-08 2018-05-08 2018-05-08 2018-05-09 2018-05-08 2018-05-09 2018-05-10 2018-05-19 2018-05-18 Consultative Workshop for Capacity and Information Selection Establishment of Balochistan Water Resource Management Authority. PK-PMU-BIWRMDP-92788-CS- Component C: Project Individual FBS / Hiring of Individual IDA / 58850 Management and Technical Post Consultant Open 15,652.00 1,714.12 Signed 2019-02-05 2019-03-08 2019-04-09 2019-03-13 2019-03-27 2019-04-22 2020-03-26 2020-04-22 Consultant - Financial Assistance Selection Management Specialist PK-PMU-BIWRMDP-97771-CS- Component C: Project Individual INDV / Hiring of Procurement IDA / 58850 Management and Technical Post Consultant Open 15,652.00 1,701.67 Signed 2019-02-05 2019-03-08 2019-04-21 2019-03-15 2019-04-22 2019-03-30 2019-04-23 2020-03-29 Specialist to work as Assistance Selection Individual Consultant PK-PMU-BIWRMDP-104301- CS-INDV / Selection of Social Component C: Project Individual Safeguards IDA / 58850 Management and Technical Post Consultant Open 13,043.00 1,697.51 Signed 2019-03-10 2019-03-21 2019-04-28 2019-05-19 2019-06-23 2019-04-23 2019-12-20 Specialist/Individual Assistance Selection Consultant PK-PMU-BIWRMDP-104309- CS-INDV / Selection of Component C: Project Individual Environmental Safeguards IDA / 58850 Management and Technical Post Consultant Open 13,043.00 1,657.00 Signed 2019-03-10 2019-04-28 2019-04-19 2019-05-19 2019-05-19 2019-06-23 2019-05-13 2019-12-20 Specialist/Individual Assistance Selection Consultant Page 8 PK-PMU-BIWRMDP-174159- Component C: Project Individual CS-INDV / Hiring of M&E IDA / 58850 Management and Technical Post Consultant Open 18,750.00 1,088.01 Signed 2020-05-21 2020-05-20 2020-07-19 2020-08-07 2020-07-29 2020-08-07 2020-08-19 2020-09-01 2021-08-19 Specialist to work as Assistance Selection Individual Consultant at PMU PK-PMU-BIWRMDP-174177- Component C: Project CS-INDV / Hiring of Gender IDA / 58850 Management and Technical Post Direct Selection Direct 18,750.00 1,070.63 Signed 2020-06-02 2020-05-22 2020-06-12 2020-06-25 2020-07-10 2020-07-01 2021-07-10 Specialist to work at PMU as Assistance Individual Consultant PK-PMU-BIWRMDP-187935- Component C: Project Individual CS-INDV / Hiring of IDA / 58850 Management and Technical Post Consultant Open 19,354.00 1.57 Signed 2020-08-09 2020-08-11 2020-09-12 2020-11-10 2020-09-19 2020-11-11 2020-10-01 2020-11-25 2021-10-01 Environmental Safeguards Assistance Selection Specialist PK-PMU-BIWRMDP-215734- Individual Component A: Institutions, CS-INDV / Hiring of Water IDA / 58850 Post Consultant Open 37,500.00 0.00 Under Review 2021-01-27 2021-01-15 2021-03-21 2021-04-11 2021-05-02 2022-05-02 Capacity and Information Resource Specialist Selection PK-PMU-BIWRMDP-218775- Component C: Project Individual Under CS-INDV / hiring of Gender IDA / 58850 Management and Technical Post Consultant Open 18,750.00 0.00 2021-02-15 2021-02-15 2021-04-05 2021-04-26 2021-05-31 2022-06-30 Implementation Specialist for PMU Assistance Selection PK-PMU-BIWRMDP-220430- Individual Component A: Institutions, Pending CS-INDV / Hiring of Water IDA / 58850 Post Consultant Open 37,500.00 0.00 2021-03-02 2021-04-24 2021-05-08 2021-05-23 2022-05-23 Capacity and Information Implementation Governance Specialist Selection PK-PMU-BIWRMDP-226348- CS-CDS / Technical Component A: Institutions, Pending Assistance for Institutional Re- IDA / 58850 Post Direct Selection Direct 320,000.00 0.00 2021-03-30 2021-04-09 2021-05-10 2022-05-10 Capacity and Information Implementation structuring and Legal Reforms in Water Sector PK-PMU-BIWRMDP-229954- Component C: Project Individual CS-INDV / Hiring of Under IDA / 58850 Management and Technical Post Consultant Open 21,138.00 0.00 2021-04-22 2021-04-26 2021-05-29 2021-06-03 2021-06-15 2022-06-30 Monitoring & Evaluation Implementation Assistance Selection Specialist Page 9 Procurement Plan I. General 1. Project information: Loan No Nom du Projet: SUPPORTING THE ECONOMIC INCLUSION OF YOUTH PROJECT Pays: Maroc Référence du Projet : P161169 Numéro du Prêt/Crédit : Agence d’exécution : MINISTERE DE L’EMPLOI ET DE L’INSERTION PROFESSIONNELLE - 2. Bank’s approval Date of the procurement Plan Original :7/9/2019; 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 06-2019- to-31-2020 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior review threshold 2. Type of procurement (US$ thousands) Works (including turnkey, supply & installation of plant and equipment, 10,000 and PPP) Goods, information technology and 2,000 non-consulting services Consultants: firms 1,000 Consultants: individuals 300 Table 2.7. Thresholds for Procurement Approaches and Methods (US$ thousands) Open Open RfQ =< Type of procurement international national < ≧ Works (including turnkey, supply & installation of plant and equipment, 10,000 10,000 300 and PPP) Goods, information technology and 3,000 3,000 200 non-consulting services Shortlist of national consulting firms 300 300 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: MOP of the Project 5. Any Other Special Procurement Arrangements: NA PROCUREMENT Morocco : Supporting the economic inclusion of youth PLAN General Information Country: Morocco Bank’s Approval Date of the Original Procurement Plan: 2020-08-07 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151169 GPN Date: Project Name: Supporting the economic inclusion of youth Loan / Credit No: IBRD / 89540 Regional center of Investissement Marrakech-Safi Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MA-CRI-187292-CW-RFB / Aménagement et Fostering the entrepreneurial réhabilitation des 8 Centres ecosystem and supporting Single Stage - One 2020-11- IBRD / 89540 Post Request for Bids Open - National 433,000.00 432,887.59 Signed 2020-08-12 2020-10-14 2020-08-14 2020-12-16 2020-09-13 2020-11-05 2020-09-18 2020-12-08 2020-09-25 2020-12-11 d'Appui à l'Entreprenariat et entrepreneurship Envelope 24 au Développement opportunities for youth Economique Local GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MA-CRI-187921-GO-RFB / Fostering the entrepreneurial Equipement des 8 Centres ecosystem and supporting Single Stage - One d'Appui à l'Entrepreneuriat et IBRD / 89540 Post Request for Bids Open - National 177,000.00 115,080.45 Signed 2020-08-12 2020-10-14 2020-08-14 2020-12-16 2020-09-13 2020-11-09 2020-09-18 2021-03-01 2020-09-25 2020-12-25 2020-11-24 entrepreneurship Envelope au Développement opportunities for youth Economique Local MA-CRI-233467-GO-RFB / Equipement des 8 CAEDEL Lot 1 : Acquisition et Fostering the entrepreneurial Pending installation du matériel de ecosystem and supporting Single Stage - One IBRD / 89540 Post Request for Bids Open - National 93,550.00 0.00 Implementati 2021-05-12 2021-05-17 2021-06-07 2021-06-21 2021-07-12 2021-10-10 vidéo de surveillance entrepreneurship Envelope on Lot 2 : Acquisition, mise en opportunities for youth service et le service après- vente du matériel informatique NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PROCUREMENT PLAN (Textual Part) Project information: Emergency Agricultural Livelihoods and Climate Resilience Project (P166328) Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT Dominica : Emergency Agricultural Livelihoods and Climate Resilience Project PLAN General Information Country: Dominica Bank’s Approval Date of the Original Procurement Plan: 2018-07-27 2021-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166328 GPN Date: Project Name: Emergency Agricultural Livelihoods and Climate Resilience Project Loan / Credit No: IDA / D3060, IDA / 62310 The Ministry of Agriculture Food and Fisheries. Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DM-MAF-101002-CW-DIR / Restoration of the Productive 2019-09- Clearance of the WNTrail - IDA / D3060 Base for the Recovery of Post Direct Selection Direct 10,000.00 14,379.70 Completed 2019-02-18 2019-02-20 2019-02-23 2019-02-21 2019-03-30 2019-05-31 26 Segments 5 and 6 Agricultural Livelihoods DM-MAF-101005-CW-DIR / Restoration of the Productive 2019-09- Clearance of the WNT - works IDA / D3060 Base for the Recovery of Post Direct Selection Direct 12,000.00 13,521.81 Signed 2019-02-18 2019-02-20 2019-02-23 2019-02-21 2019-03-30 2019-05-31 26 on segments 11 and 13 Agricultural Livelihoods DM-MAF-101006-CW-DIR / Restoration of the Productive 2019-09- Clearance of WNT - Segment IDA / D3060 Base for the Recovery of Post Direct Selection Direct 44,000.00 41,145.04 Signed 2019-02-18 2019-02-20 2019-02-23 2019-02-21 2019-03-30 2019-05-31 26 8 Agricultural Livelihoods DM-MAF-133099-CW-RFQ / Restoration of Key Productive Request for Single Stage - One 2020-05- Rehabilitation of Central IDA / 62310 Infrastructure and Post Limited 200,000.00 226,522.41 Signed 2019-09-15 2020-06-22 2019-11-10 2020-12-18 Quotations Envelope 08 Livestock Farm Institutional Strengthening DM-MAF-170057-CW-RFQ / Contingency Emergency Request for Single Stage - One 2020-12- Retrofitting Buildings into IDA / 62310 Post Limited 135,740.74 0.00 Canceled 2020-04-28 2020-06-23 Response Quotations Envelope 20 COVID Facilities DM-MAF-170098-CW-DIR / Installation of Water and Contingency Emergency 2020-11- Sewerage at Expert Dormitory IDA / 62310 Post Direct Selection Direct 9,258.01 9,212.79 Completed 2020-04-23 2020-04-23 2020-04-23 2020-05-08 2020-05-14 2020-07-20 Response 10 Dominica China Friendship Hospital (DCFH) DM-MAF-171359-CW-DIR / Retrofitting Buildings at St. Contingency Emergency 2020-11- IDA / 62310 Post Direct Selection Direct 135,740.74 133,567.36 Completed 2020-04-30 2020-04-30 2020-05-05 2020-05-05 2020-05-19 2020-05-08 James Portsmouth into COVID Response 15 Facilities DM-MAF-171366-CW-DIR / Installation of Electricity at Contingency Emergency 2020-11- Expert Dormitory Dominica IDA / 62310 Post Direct Selection Direct 12,001.85 11,957.56 Signed 2020-04-30 2020-04-23 2020-04-30 2020-03-20 2020-05-12 2021-03-09 Response 08 China Friendship Hospital (DCFH) DM-MAF-200111-CW-RFQ / Restoration of Key Productive Rehabilitation of the North Request for Single Stage - One 2021-06- IDA / D3060 Infrastructure and Post Open - National 109,207.00 132,741.48 Signed 2020-11-06 2020-12-01 2021-01-01 2021-06-09 East Agriculture Regional Quotations Envelope 30 Institutional Strengthening Office DM-MAF-203575-CW-RFB / Refurbishment Works at Restoration of Key Productive Pending Single Stage - One 2021-09- Ground Floor of DBMC IDA / D3060 Infrastructure and Post Request for Bids Open - National 278,859.00 0.00 Implementat 2020-11-13 2020-11-18 2020-12-30 2021-01-29 2021-03-05 Envelope 01 Building - EALCRP Project Institutional Strengthening ion Implementation Unit Office DM-MAF-71654-CW-RFQ / Restoration of Key Productive Pending Request for Single Stage - One 2021-11- Reconstruction of irrigation IDA / D3060 Infrastructure and Post Limited 185,185.00 0.00 Implementat 2021-04-05 2021-05-31 Quotations Envelope 27 systems Institutional Strengthening ion DM-MAF-71675-CW-CDD / Restoration of the Productive Pending Works for Restoration of key Single Stage - One 2022-10- IDA / D3060 Base for the Recovery of Post Request for Bids Open - National 1,434,000.00 0.00 Implementat 2021-12-17 2021-12-22 2022-02-02 2022-03-04 2022-04-08 infrastucture in the Envelope 05 Agricultural Livelihoods ion Waitukubuli National Trail DM-MAF-233771-CW-RFQ / Request for Procurement of Small Works Restoration of the Productive Quotations - Small Under Request for Single Stage - One 2021-09- in Support of Livestock IDA / D3060 Base for the Recovery of Post Limited Works 50,000.00 0.00 Implementat 2021-05-25 2021-07-06 Quotations Envelope 04 Restoration in the North East Agricultural Livelihoods (Emergency) SPD - ion Agriculture Region Competitive GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MAF-71512-G9-RFQ / Restoration of Key Productive Under purchase of building materials Request for Single Stage - One IDA / D3060 Infrastructure and Post Limited 100,000.00 0.00 Implementati 2018-07-30 2020-09-25 2018-09-24 2019-03-23 for the construction of Quotations Envelope Institutional Strengthening on resilient livestock structures DM-MAF-91294-GO-RFB / Restoration of the Productive Single Stage - One purchase of agricultural IDA / D3060 Base for the Recovery of Prior Request for Bids Open - International 2,500,000.00 0.00 Canceled 2019-03-25 2019-03-30 2019-05-11 2019-06-10 2019-07-15 2020-01-11 Envelope inputs to facilitate production Agricultural Livelihoods DM-MAF-71512-G5-RFQ / Restoration of the Productive Request for Single Stage - One purchase of transportation for IDA / D3060 Base for the Recovery of Post Limited 100,000.00 108,487.08 Completed 2019-02-18 2019-03-26 2019-04-15 2019-08-26 2019-10-12 2019-10-31 Quotations Envelope the Ministry Agricultural Livelihoods DM-MAF-71657-G14-RFQ / Restoration of Key Productive purchase of office Request for Single Stage - One IDA / D3060 Infrastructure and Post Limited 100,000.00 34,908.86 Completed 2019-05-06 2019-02-21 2019-07-01 2019-05-16 2019-12-28 2019-10-31 furniture,fixtures equipment Quotations Envelope Institutional Strengthening and general supplies Page 1 DM-MAF-97599-GO-RFQ / Purchase of office equipment Restoration of Key Productive Under Request for Single Stage - One - computers, IDA / D3060 Infrastructure and Post Limited 100,000.00 0.00 Implementati 2019-02-23 2019-04-20 2019-10-17 Quotations Envelope telecommunications and Institutional Strengthening on accessories DM-MAF-71727-GO-RFB / Restoration of Key Productive Procurement of Hardware for Single Stage - One IDA / D3060 Infrastructure and Post Request for Bids Open - National 300,000.00 0.00 Canceled 2019-05-14 2019-05-19 2019-06-30 2019-07-30 2019-09-03 2020-03-01 Existing Agricultural Envelope Institutional Strengthening Information system Restoration of the Productive DM-MAF-91291-GO-RFB / Single Stage - One IDA / 62310 Base for the Recovery of Post Request for Bids Open - International 500,000.00 0.00 Canceled 2019-01-23 2019-01-28 2019-03-11 2019-04-10 2019-05-15 2019-11-11 fertilizer for crop production Envelope Agricultural Livelihoods DM-MAF-124550-GO-RFQ / Restoration of the Productive Request for Single Stage - One Purchase of Fertilizer to IDA / D3060 Base for the Recovery of Post Limited 500,000.00 483,066.42 Completed 2019-08-02 2019-08-20 2019-09-27 2019-10-01 2020-03-25 2020-03-30 Quotations Envelope restore crop production Agricultural Livelihoods DM-MAF-124551-GO-RFB / Restoration of the Productive Single Stage - One Purchase of Fertilizer to IDA / D3060 Base for the Recovery of Post Request for Bids Open - International 1,100,000.00 727,534.59 Completed 2019-07-28 2019-07-25 2019-08-02 2019-07-25 2019-09-13 2019-09-05 2019-10-13 2019-09-24 2019-11-17 2019-11-11 2020-05-15 2020-05-19 Envelope restore crop systems Agricultural Livelihoods DM-MAF-71512-G3-RFQ / Restoration of the Productive purchase of vegetable seeds Single Stage - One IDA / D3060 Base for the Recovery of Post Request for Bids Open - International 350,000.00 0.00 Canceled 2019-02-28 2019-03-05 2019-04-16 2019-05-16 2019-06-20 2019-12-17 for expansion of production Envelope Agricultural Livelihoods and livelihoods DM-MAF-124786-GO-RFQ / Purchase of vegetable seeds, Restoration of the Productive in vitro propagated Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Limited 350,000.00 142,751.66 Completed 2019-08-07 2019-08-20 2019-10-02 2019-10-11 2020-03-30 2020-06-18 horticulture and traditional Quotations Envelope Agricultural Livelihoods horticulture (Passion fruit seedlings) DM-MAF-71512-G2-RFQ / Restoration of the Productive Single Stage - One purchase seeds package for IDA / D3060 Base for the Recovery of Prior Request for Bids Open - International 3,500,000.00 0.00 Canceled 2019-04-18 2019-04-23 2019-06-04 2019-07-04 2019-08-08 2020-02-04 Envelope root crop production Agricultural Livelihoods DM-MAF-133047-GO-RFB / Restoration of the Productive Procurement of Agriculture Single Stage - One IDA / D3060 Base for the Recovery of Post Request for Bids Open - International 1,000,000.00 968,718.81 Completed 2019-09-06 2019-08-22 2019-09-11 2019-09-20 2019-10-23 2019-10-31 2019-11-22 2019-12-20 2019-12-27 2020-05-20 2020-06-24 2021-03-25 Inputs to Facilitate Production Envelope Agricultural Livelihoods of Crops DM-MAF-133055-GO-RFQ / Restoration of the Productive Procurement of Agriculture Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Limited 500,000.00 490,416.00 Completed 2019-09-11 2019-08-20 2019-11-06 2019-10-14 2020-05-04 2020-03-25 Inputs to Facilitate Crop Quotations Envelope Agricultural Livelihoods Production DM-MAF-71673-G16-RFQ / Restoration of Key Productive tools and machinery to Single Stage - One IDA / D3060 Infrastructure and Post Request for Bids Open - International 1,100,000.00 0.00 Canceled 2019-03-22 2019-03-27 2019-05-08 2019-06-07 2019-07-12 2020-01-08 restore agriculture, fisheries Envelope Institutional Strengthening and Forestry Restoration of Key Productive DM-MAF-71667-G15-RFQ / Single Stage - One IDA / D3060 Infrastructure and Post Request for Bids Open - International 500,000.00 0.00 Canceled 2019-05-22 2019-05-27 2019-07-08 2019-08-07 2019-09-11 2020-03-09 agricultural equipment Envelope Institutional Strengthening DM-MAF-133072-GO-RFQ / Restoration of the Productive Procurement of Agricultural Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Limited 500,000.00 501,074.53 Signed 2019-09-11 2019-08-30 2019-11-06 2019-11-15 2020-05-04 Tools & Equipment to Quotations Envelope Agricultural Livelihoods facilitate crop production DM-MAF-133089-GO-RFQ / Project Management and Request for Single Stage - One Procurement of Additional IDA / D3060 Post Limited 30,000.00 29,347.27 Completed 2019-09-13 2019-10-07 2019-11-08 2019-10-29 2020-05-06 2020-03-25 Coordination Quotations Envelope Furniture DM-MAF-71512-G12-RFQ / central livestock restoration - Restoration of Key Productive Request for Single Stage - One materials including lumber, IDA / D3060 Infrastructure and Post Open - National 100,000.00 0.00 Canceled 2019-03-12 2019-05-07 2019-11-03 Quotations Envelope cement, galvanise, and Institutional Strengthening fencing. DM-MAF-138648-GO-RFQ / Procurement of Passion Fruit Restoration of the Productive Request for Single Stage - One Seedlings for Expansion of IDA / D3060 Base for the Recovery of Post Limited 10,000.00 9,225.09 Completed 2019-10-04 2019-10-07 2019-11-29 2020-02-21 2020-05-27 2020-06-19 Quotations Envelope Production and Restoring of Agricultural Livelihoods Livelihoods DM-MAF-141401-GO-RFQ / Restoration of the Productive Procurement of Containers for Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Limited 25,000.00 28,782.29 Signed 2019-10-29 2019-11-14 2019-12-24 2020-03-17 2020-06-21 Storage and Distribution of Quotations Envelope Agricultural Livelihoods Agricltural Inputs DM-MAF-143910-GO-RFQ / Procurement of Warehouse Restoration of the Productive Inventory System to Manage Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Limited 50,000.00 25,542.20 Signed 2019-11-11 2019-11-08 2020-01-06 2020-01-28 2020-07-04 Storage and Distribution of Quotations Envelope Agricultural Livelihoods Agricultural Inputs to EALCRP Beneficiaries DM-MAF-141190-GO-RFB / Restoration of Key Productive Under Procurement of Agriculture Single Stage - One IDA / D3060 Infrastructure and Post Request for Bids Open - International 150,000.00 0.00 Implementati 2019-10-24 2021-05-10 2019-10-29 2019-12-10 2020-01-09 2020-02-13 2020-08-11 Management Information Envelope Institutional Strengthening on System Equipment DM-MAF-141412-GO-RFB / Restoration of the Productive Procurement of Outboard Single Stage - One IDA / D3060 Base for the Recovery of Post Request for Bids Open - International 650,000.00 648,723.25 Signed 2019-10-24 2020-01-17 2019-10-29 2020-01-17 2019-12-10 2020-03-04 2020-01-09 2020-03-04 2020-02-13 2020-08-13 2020-08-11 Engines for the Restoration of Envelope Agricultural Livelihoods Fisheries Livelihoods DM-MAF-170055-GO-DIR / Procurement and installation Contingency Emergency IDA / 62310 Post Direct Selection Direct 273,600.00 291,085.00 Completed 2020-04-22 2020-04-22 2020-04-27 2020-05-08 2020-06-01 2020-05-28 2020-11-28 2020-09-02 of Isolation Units to combat Response COVID 19 DM-MAF-170062-GO-RFQ / Procurement of Intensive Unit Contingency Emergency Request for Single Stage - One IDA / 62310 Post Limited 179,131.18 0.00 Canceled 2020-04-28 2020-06-19 2020-12-16 Healthcare Equipment for the Response Quotations Envelope COVID Center at Portsmouth Page 2 DM-MAF-170176-GO-RFQ / Procurement of Medical Supplies including PPEs for Contingency Emergency Request for Single Stage - One Frontline Extension Officers IDA / 62310 Post Limited 1,135,637.98 0.00 Canceled 2020-04-28 2020-06-19 2020-12-16 Response Quotations Envelope PIU Warehouse Staff and Healthcare workers to Mitigate against COVID 19 DM-MAF-170067-GO-RFQ / Procurement of Healthcare Under Supplies and Materials for the Contingency Emergency Request for Single Stage - One IDA / 62310 Post Limited 321,141.87 315,324.92 Implementati 2020-04-27 2020-11-27 2020-06-09 2020-12-06 Intensive Care and In-patient Response Quotations Envelope on Units of the COVID Center at Portsmouth DM-MAF-170069-GO-RFQ / Procurement of IT equipment Contingency Emergency Request for Single Stage - One for Health EOC monitoring IDA / 62310 Post Limited 19,244.67 22,291.48 Signed 2020-04-23 2020-05-22 2020-05-31 2020-08-31 2020-11-27 Response Quotations Envelope during the COVID 19 pandemic DM-MAF-170091-GO-RFQ / Procurement of Medical Under Laboratory Supplies for Contingency Emergency Request for Single Stage - One IDA / 62310 Post Limited 19,243.70 0.00 Implementati 2020-04-24 2020-11-16 2020-06-01 2020-11-28 increased laboratory capacity Response Quotations Envelope on for PCR testing of the SARSs- COV-2 virus DM-MAF-171292-GO-DIR / Procurement of Intensive Unit Contingency Emergency IDA / 62310 Post Direct Selection Direct 149,131.18 149,000.00 Signed 2020-04-30 2020-04-30 2020-05-03 2020-05-28 2020-05-12 2020-06-26 2020-11-08 Healthcare Equipment for Response COVID Center at Portsmouth DM-MAF-171295-GO-DIR / Procurement of PPEs for Contingency Emergency IDA / 62310 Post Direct Selection Direct 1,009,762.68 1,009,762.68 Completed 2020-04-30 2020-04-30 2020-05-05 2020-05-08 2020-05-19 2020-05-18 2020-11-15 2020-07-06 Frontline Healthcare workers Response to Mitigate against COVID 19 DM-MAF-171296-GO-DIR / Procurement of Medical Contingency Emergency IDA / 62310 Post Direct Selection Direct 120,875.30 120,875.30 Completed 2020-04-30 2020-04-30 2020-05-05 2020-05-08 2020-05-26 2020-05-13 2020-11-22 2020-07-16 Supplies for the Central Response Medical Store DM-MAF-171383-GO-DIR / Procurement of Hospital Beds Contingency Emergency to Augment Capacity of IDA / 62310 Post Direct Selection Direct 30,000.00 30,000.00 Completed 2020-04-30 2020-04-30 2020-05-05 2020-05-08 2020-05-19 2020-05-18 2020-11-15 2020-12-01 Response Intensive Care Unit at the St. James COVID Center DM-MAF-170095-GO-RFQ / Procurement of Feed to Contingency Emergency Request for IDA / 62310 Post 75,870.00 80,345.83 Signed 2020-05-02 2020-06-14 2020-06-23 2020-07-28 2020-12-20 provide Input Support to Response Quotations Livestock Producers DM-MAF-175742-GO-DIR / Procurement of Broiler Chicks Contingency Emergency for Distribution to EALCRP- IDA / 62310 Post Direct Selection Direct 19,500.00 26,100.00 Signed 2020-05-29 2020-05-29 2020-06-03 2020-07-03 2020-06-19 2020-07-20 2021-02-28 Response CERC Livestock Beneficiary Farmers DM-MAF-175945-GO-DIR / Procurement of Seeds to Contingency Emergency Facilitate Strengthening of IDA / 62310 Post Direct Selection Direct 92,593.00 38,013.28 Completed 2020-05-29 2020-05-29 2020-06-01 2020-06-05 2020-06-30 2020-06-18 2020-12-27 2020-10-27 Response Micro Farming Systems in Dominica DM-MAF-175946-GO-RFQ / Procurement of Seedling Propagation Supplies for Implementation of the Contingency Emergency Request for Single Stage - One IDA / 62310 Post Limited 12,037.00 12,053.36 Completed 2020-06-01 2020-06-18 2020-07-09 2020-07-20 2021-01-05 2020-10-01 Strengthening of Micro - Response Quotations Envelope farms/ Micro-garden Systems Component of the EALCRP- CERC DM-MAF-175954-GO-RFQ / Procurement of Computers Restoration of Key Productive and Accessories for the Request for Single Stage - One IDA / D3060 Infrastructure and Post Limited 100,000.00 105,680.83 Signed 2020-06-05 2020-07-06 2020-07-31 2020-09-30 2021-01-27 Ministry of Blue and Green Quotations Envelope Institutional Strengthening Economy, Agriculture & National Food Security DM-MAF-133149-GO-RFB / Restoration of the Productive Procurement of Agricultural Single Stage - One IDA / D3060 Base for the Recovery of Prior Request for Bids Open - International 2,100,000.00 0.00 Canceled 2019-09-10 2020-06-04 2019-09-15 2020-06-29 2019-10-27 2020-08-05 2019-11-26 2019-12-31 2020-06-28 Tools & Equipment for Crop Envelope Agricultural Livelihoods Production DM-MAF-200115-GO-RFB / Restoration of the Productive Single Stage - One Procurement of Agricultural IDA / D3060 Base for the Recovery of Post Request for Bids Open - International 2,100,000.00 1,661,069.56 Signed 2020-11-09 2020-11-09 2020-11-14 2020-12-09 2020-12-26 2021-02-04 2021-01-25 2021-02-18 2021-03-01 2021-04-19 2021-08-28 Envelope Tools Agricultural Livelihoods DM-MAF-201606-GO-DIR / Restoration of the Productive Procurement of Canoes for IDA / D3060 Base for the Recovery of Post Direct Selection Direct 50,000.00 26,568.27 Signed 2020-11-13 2020-11-06 2020-11-18 2020-12-09 2020-12-27 2021-04-21 2021-09-24 Fisher Folk Canoe Agricultural Livelihoods Replacements DM-MAF-99435-GO-RFQ / Restoration of Key Productive Pending Request for Single Stage - One Equipment for restoration of IDA / D3060 Infrastructure and Post Open - International 100,000.00 0.00 Implementati 2021-07-20 2021-09-14 2022-03-13 Quotations Envelope CLF Institutional Strengthening on DM-MAF-223164-GO-RFQ / Supplies and Materials for the Restoration of the Productive Under Request for Single Stage - One Construction of Plug and IDA / D3060 Base for the Recovery of Post Open - National 100,000.00 0.00 Implementati 2021-04-05 2021-05-31 2021-11-27 Quotations Envelope Molds towards building Agricultural Livelihoods on resilient FRP Fishing Boats. DM-MAF-227065-GO-RFQ / Restoration of the Productive Under Procurement of Additional Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Limited 800,000.00 0.00 Implementati 2021-04-05 2021-04-14 2021-05-31 2021-11-27 Fertilizers for Distribution to Quotations Envelope Agricultural Livelihoods on EALCRP Beneficiaries Page 3 DM-MAF-227064-GO-RFQ / Restoration of the Productive Under Procurement of Agro- Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Limited 100,000.00 0.00 Implementati 2021-04-05 2021-04-12 2021-05-31 2021-11-27 Chemicals for Distribution to Quotations Envelope Agricultural Livelihoods on Beneficiaries of the EALCRP DM-MAF-232555-GO-RFQ / Restoration of the Productive Under Building Materials for the Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Open - National 100,000.00 0.00 Implementati 2021-05-19 2021-07-14 2022-01-10 Construction of Resilient Quotations Envelope Agricultural Livelihoods on Livestock Structures DM-MAF-71512-G4-RFQ / Restoration of the Productive Single Stage - One Purchase of materials to IDA / D3060 Base for the Recovery of Post Request for Bids Open - International 350,000.00 0.00 Canceled 2021-04-30 2021-05-05 2021-06-16 2021-07-16 2021-08-20 2022-02-16 Envelope support Livestock restoration Agricultural Livelihoods DM-MAF-233769-GO-RFQ / Purchase of Materials to Restoration of the Productive Under Request for Single Stage - One Support Livestock Restoration IDA / D3060 Base for the Recovery of Post Open - National 300,000.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 Quotations Envelope in the North-East Agriculture Agricultural Livelihoods on Region DM-MAF-233772-GO-RFQ / Restoration of the Productive Pending Procurement of PPEs to Request for Single Stage - One IDA / D3060 Base for the Recovery of Post Limited 8,000.00 0.00 Implementati 2021-05-19 2021-06-24 2021-07-16 facilitate boat building Quotations Envelope Agricultural Livelihoods on training DM-MAF-138647-GO-RFQ / Procurement of Invitro Restoration of the Productive Request for Single Stage - One Propagated Horticulture Crops IDA / D3060 Base for the Recovery of Post Limited 50,800.00 0.00 Canceled 2019-10-04 2020-01-20 2019-11-29 2020-05-27 Quotations Envelope for expansion of production Agricultural Livelihoods and restoring of livelihoods DM-MAF-234025-GO-RFQ / Restoration of the Productive Pending Request for Single Stage - One Invitro Propagated Banana, IDA / D3060 Base for the Recovery of Post Open - National 76,042.00 0.00 Implementati 2021-07-05 2021-08-30 2021-10-29 Quotations Envelope Pineapples and Cut Flowers Agricultural Livelihoods on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MAF-101000-NC-RFP / Restoration of Key Productive Pending Single Stage - One Rehabilitation of boats to IDA / D3060 Infrastructure and Post Request for Bids Open - National 880,000.00 0.00 Implementati 2021-09-30 2021-10-05 2021-11-16 2021-12-16 2022-01-20 2022-07-19 Envelope increase fish production Institutional Strengthening on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MAF-71726-CS-LCS / Project Management and Least Cost IDA / D3060 Post Open - National 150,000.00 29,431.73 Signed 2019-07-02 2019-08-15 2019-07-23 2019-09-06 2019-09-05 2019-10-17 2019-10-03 2019-12-05 2019-11-02 2019-12-05 2019-12-07 2020-04-23 2020-01-11 2020-10-28 2020-07-09 financial Audit Coordination Selection DM-MAF-138893-CS-CQS / Restoration of Key Productive Consultant Wildlife Survey Needs IDA / D3060 Infrastructure and Post Qualification Limited 48,000.00 47,940.00 Signed 2019-10-09 2019-10-18 2019-10-23 2019-11-28 2019-11-22 2020-02-14 2019-12-27 2021-02-05 2020-06-24 Asssement and Design Institutional Strengthening Selection DM-MAF-101846-CS-QBS / Restoration of the Productive Consultant Consultant Services for Design IDA / D3060 Base for the Recovery of Post Qualification Open - National 100,000.00 0.00 Canceled 2019-04-30 2019-05-21 2019-07-04 2019-08-03 2019-09-07 2020-03-05 and Supervision of Civil Works Agricultural Livelihoods Selection for reopening the WNT DM-MAF-147267-CS-CQS / Consultant Services for Design Restoration of Key Productive Consultant and Supervision of Civil Works Under IDA / D3060 Infrastructure and Post Qualification Limited 180,000.00 0.00 2019-11-26 2020-01-21 2019-12-10 2020-07-03 2020-01-09 2020-08-26 2020-02-13 2020-08-11 for reopening of the Implementation Institutional Strengthening Selection Waitukubuli National Trail (WNT) DM-MAF-71680-CS-QCBS / Restoration of Key Productive analytical work for long term Quality And Cost- Pending IDA / D3060 Infrastructure and Post Open - International 300,000.00 0.00 2021-11-26 2021-12-17 2022-01-30 2022-02-27 2022-03-29 2022-05-03 2022-06-07 2023-06-07 Delivery of Ecosystems Based Selection Implementation Institutional Strengthening systems DM-MAF-71727-CS-LCS / Project Management and Least Cost IDA / D3060 Post Open - National 100,000.00 0.00 Canceled 2019-07-01 2019-07-22 2019-09-04 2019-10-02 2019-11-01 2019-12-06 2020-01-10 2020-07-08 technical audits and surveys Coordination Selection DM-MAF-71678-CS-QCBS / Restoration of Key Productive Quality And Cost- Analytical work for long term IDA / D3060 Infrastructure and Post Open - International 671,640.00 0.00 Canceled 2019-06-03 2019-06-24 2019-08-07 2019-09-04 2019-10-04 2019-11-08 2019-12-13 2020-12-12 Based Selection delivery of Ecosystems Institutional Strengthening DM-MAF-71517-CS-QCBS / Restoration of Key Productive development services for Quality And Cost- IDA / D3060 Infrastructure and Post Open - International 850,000.00 0.00 Canceled 2018-10-01 2018-10-22 2018-12-05 2019-01-02 2019-02-01 2019-03-08 2019-04-12 2020-04-11 transfer of agric business Based Selection Institutional Strengthening knowledge Restoration of Key Productive DM-MAF-71682-CS-QCBS / Quality And Cost- Pending IDA / D3060 Infrastructure and Post Open - International 300,000.00 0.00 2021-06-20 2021-07-11 2021-08-24 2021-09-21 2021-10-21 2021-11-25 2021-12-30 2022-12-30 Analytical work for fisheries Based Selection Implementation Institutional Strengthening DM-MAF-71518-CS-CQS / Restoration of Key Productive Consultant Pending Analytical work for value IDA / D3060 Infrastructure and Post Qualification Open - National 150,000.00 0.00 2021-06-28 2021-07-19 2021-09-01 2021-10-01 2021-11-05 2022-05-04 Implementation chains Institutional Strengthening Selection DM-MAF-222644-CS-QCBS / Consultancy for Engineering Restoration of Key Productive Design and Supervision of the Quality And Cost- Under IDA / D3060 Infrastructure and Post Open - International 350,000.00 0.00 2021-03-26 2021-04-28 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-10-05 Works for Restoration of Key Based Selection Implementation Institutional Strengthening Infrastructure in Agriculture, Livestock, and Forestry INDIVIDUAL CONSULTANTS Page 4 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MAF-71516-CS-INDV / Restoration of Key Productive Individual technical support for IDA / D3060 Infrastructure and Post Consultant Open 150,000.00 13,500.00 Signed 2018-07-27 2019-08-20 2018-09-14 2019-10-28 2018-10-05 2019-10-29 2018-11-09 2019-10-29 2019-05-08 assistance to the design and Institutional Strengthening Selection construction of boats Individual DM-MAF-71722-CS-INDV / Project Management and Under IDA / D3060 Post Consultant Open 192,000.00 0.00 2018-08-01 2018-09-19 2018-10-10 2018-11-14 2019-05-13 project manager Coordination Implementation Selection DM-MAF-71725-CS-INDV / Individual Project Management and M&E/Agricultural IT IDA / D3060 Post Consultant Open 120,000.00 0.00 Under Review 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 Coordination specialists Selection Individual DM-MAF-71726-CS-INDV / Project Management and Under IDA / D3060 Post Consultant Open 57,600.00 0.00 2018-09-03 2019-02-15 2018-10-22 2018-11-12 2018-12-17 2019-06-15 Agricultural specialists Coordination Implementation Selection Individual DM-MAF-71727-CS-INDV / Project Management and Under IDA / D3060 Post Consultant Open 200,000.00 0.00 2018-09-03 2020-08-11 2018-10-22 2020-09-24 2018-11-12 2020-09-24 2018-12-17 2019-06-15 portfolio manager Coordination Implementation Selection Individual DM-MAF-71729-CS-INDV / Project Management and Under IDA / D3060 Post Consultant Open 200,000.00 0.00 2018-09-03 2020-08-11 2018-10-22 2020-09-24 2018-11-12 2020-09-24 2018-12-17 2019-06-15 FM Specialists(IST) Coordination Implementation Selection Individual DM-MAF-71721-C32-INDV / Project Management and Under IDA / D3060 Post Consultant Open 62,500.00 0.00 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 M&E IST Coordination Implementation Selection Restoration of Key Productive Individual DM-MAF-71724-CS-INDV / IDA / D3060 Infrastructure and Post Consultant Open 60,000.00 0.00 Canceled 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 civil engineer Institutional Strengthening Selection Individual DM-MAF-71721-CS-INDV / Project Management and IDA / D3060 Post Consultant Open 100,000.00 0.00 Canceled 2018-08-01 2018-09-19 2018-10-10 2018-11-14 2019-05-13 social safeguards officer Coordination Selection Individual DM-MAF-71731-CS-INDV / Project Management and Under IDA / D3060 Post Consultant Open 200,000.00 0.00 2018-09-03 2020-08-11 2018-10-22 2020-09-24 2018-11-12 2020-09-24 2018-12-17 2023-05-31 social safeguards IST Coordination Implementation Selection Individual DM-MAF-71728-CS-INDV / Project Management and Under IDA / D3060 Post Consultant Open 200,000.00 0.00 2018-09-03 2020-08-11 2018-10-22 2020-09-24 2018-11-12 2020-09-24 2018-12-17 2023-05-31 procurement(IST) Coordination Implementation Selection Individual DM-MAF-71730-CS-INDV / Project Management and Pending IDA / D3060 Post Consultant Open 200,000.00 0.00 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2023-05-31 environmental safeguards(IST) Coordination Implementation Selection Individual DM-MAF-87854-CS-INDV / Project Management and IDA / D3060 Post Consultant Open 75,000.00 0.00 Under Review 2019-02-08 2019-02-19 2019-03-29 2019-04-19 2019-05-24 2023-06-30 Executive Assistant Coordination Selection Restoration of Key Productive Individual DM-MAF-94789-CS-INDV / Under IDA / D3060 Infrastructure and Post Consultant Open 125,000.00 0.00 2019-02-08 2020-02-10 2019-03-29 2019-04-19 2019-05-24 2023-06-30 Social Safeguards Officer Implementation Institutional Strengthening Selection DM-MAF-87852-CS-INDV / Individual Project Management and Monitoring and Evaluation IDA / D3060 Post Consultant Open 135,000.00 0.00 Under Review 2019-02-08 2019-02-11 2019-03-29 2019-04-19 2019-05-24 2023-06-30 Coordination Officer Selection Individual DM-MAF-87851-CS-INDV / Project Management and IDA / D3060 Post Consultant Open 160,000.00 37,638.38 Signed 2019-02-08 2019-02-08 2019-03-29 2019-05-31 2019-04-19 2019-06-04 2019-05-24 2019-06-12 2023-06-30 Procurement Officer Coordination Selection DM-MAF-87849-CS-INDV / Restoration of Key Productive Individual Environmental Safeguards IDA / D3060 Infrastructure and Post Consultant Open 125,000.00 0.00 Under Review 2019-02-08 2019-02-08 2019-03-29 2019-04-19 2019-05-24 2023-06-30 Officer Institutional Strengthening Selection Individual DM-MAF-87853-CS-INDV / Project Management and IDA / D3060 Post Consultant Open 100,000.00 61,992.62 Completed 2019-02-08 2019-02-08 2019-03-29 2019-05-31 2019-04-19 2019-03-28 2019-05-24 2019-06-14 2023-06-30 2021-05-31 Communications Officer Coordination Selection Individual DM-MAF-87850-CS-INDV / Project Management and IDA / D3060 Post Consultant Open 155,000.00 70,848.71 Signed 2019-02-15 2019-02-15 2019-04-05 2019-05-31 2019-04-26 2019-06-05 2019-05-31 2019-06-05 2023-06-30 Financial Management Officer Coordination Selection DM-MAF-94794-CS-CDS / Restoration of Key Productive Individual Forestry Officer - focal point IDA / D3060 Infrastructure and Post Consultant Open 60,000.00 24,354.24 Signed 2019-02-22 2019-02-04 2019-04-12 2019-05-31 2019-05-03 2019-05-31 2019-06-07 2019-06-14 2021-06-30 in the PIU responsible for all Institutional Strengthening Selection Forestry related activities DM-MAF-94792-CS-CDS / Restoration of Key Productive Individual Fisheries Officer - focal point IDA / D3060 Infrastructure and Post Consultant Open 60,000.00 48,708.48 Completed 2019-02-15 2019-02-15 2019-04-05 2019-05-31 2019-04-26 2019-05-31 2019-05-31 2019-06-07 2021-06-30 2021-06-02 in the PIU for all Fisheries Institutional Strengthening Selection related activities DM-MAF-101001-CS-INDV / Project Implementation Individual Support Advisor - to facilitate Project Management and IDA / D3060 Post Consultant Open 60,000.00 0.00 Canceled 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2019-11-30 the execution of project Coordination Selection activities in a timely and effective manner DM-MAF-118578-CS-CDS / Project Implementation Support Advisor (PISA) to Project Management and Under IDA / D3060 Post Direct Selection Direct 100,000.00 0.00 2019-06-24 2019-06-24 2019-07-04 2019-09-07 2020-03-05 facilitate timely execution of Coordination Implementation Project in an effective and efficient manner. Page 5 DM-MAF-138613-CS-INDV / Agriculture Information Technology Officer will Individual assume full responsibility for Project Management and IDA / D3060 Post Consultant Limited 120,000.00 53,136.53 Signed 2019-10-04 2019-09-27 2019-10-04 2019-10-04 2019-10-25 2019-11-29 2019-11-29 2020-05-14 2020-05-27 managing and overseeing the Coordination Selection information management and monitoring function of the project at all levels DM-MAF-133076-CS-CDS / Individual Civil Engineer for Project Management and IDA / D3060 Post Consultant Limited 150,000.00 61,992.62 Signed 2019-10-04 2019-08-16 2019-10-07 2019-10-04 2019-10-28 2019-11-29 2019-12-02 2020-04-07 2020-05-30 infrastructure, building, Coordination Selection surfacing and paving services Restoration of Key Productive Individual DM-MAF-94791-CS-INDV / IDA / D3060 Infrastructure and Post Consultant Open 150,000.00 0.00 Canceled 2019-02-08 2019-02-08 2019-03-29 2019-04-19 2019-05-24 2023-06-30 Civil Engineer Institutional Strengthening Selection DM-MAF-95860-CS-INDV / Restoration of Key Productive Individual training for farmers and IDA / D3060 Infrastructure and Post Consultant Open 100,000.00 0.00 Canceled 2019-03-12 2019-04-30 2019-05-21 2019-06-25 2019-12-22 extension officers Institutional Strengthening Selection DM-MAF-99403-CS-INDV / Individual Project Management and Pending Information System IDA / D3060 Post Consultant Limited 100,000.00 0.00 2021-06-30 2021-07-05 2021-07-26 2021-08-30 2022-02-26 Coordination Implementation Development Selection DM-MAF-224389-CS-CDS / Restoration of the Productive Technical Assistance towards IDA / D3060 Base for the Recovery of Post Direct Selection Direct 20,000.00 0.00 Under Review 2021-03-31 2021-03-31 2021-04-10 2021-05-02 2021-07-01 Building Resilient FRP Fishing Agricultural Livelihoods Boats in Dominica Page 6 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Original: May 2013]: Revision 13 of Updated Procurement Plan, April 2017 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: The procurement period of project covered from year July 2017 2010 to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Applicable 4. Reference to (if any) Project Operational/Procurement Manual: Manuel de procédures administratives, comptables et financières du projet « Jigisèmèjiri », Juillet 2013 5. Any Other Special Procurement Arrangements: 6. Summary of the Procurement Packages planned during the first 18 July 9, 2010 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: 4. Consultancy Assignments with Selection Methods and Time Schedule July 9, 2010 Individual Consultant Selection Evaluation of Invitation Contr Cont Expression Justificati Notificatio Lo Esti to Draft act Contract ract Activit Terms of Expression of Interest on for n of Signed an mat Ac Identified / Negotiated Ame Completio Ter y Re Mar Pro Reference of Interest and Short Direct Intention Contract / ed tivi Selected Contract ndm n mina Refere vie Cat ket ces List of Selection of Award Cr Comp Am ty Consultant ents tion nce w ego App s Consultant ed onent oun St No. / Ty ry roa Stat s it t at Descri pe ch us No (US us ption: . $) Ac Ac Ac Pla Ac Ac Ac Ac Ac Ac Plan Plan Plan Plan Plan Plan Plan Actu Plan Actu tu tu tu nn tu tu tu tu tu tu ned ned ned ned ned ned ned al ned al al al al ed al al al al al al SC- REF 14 / Compi lation des résult 1. ats Cash des transf enquê er ID Con tes progr A- sult 40, Sub Cle 201 201 201 201 201 201 201 201 CAP ams Po Op H ant 000 mitt ar 7/09 7/09 7/10 7/11 7/11 7/12 7/12 8/06 des and st en 83 Serv .00 ed ed /15 /29 /29 /03 /24 /08 /29 /27 18 acco 50 ices zones mpan d’inter ying ventio meas n et ures rédact ion du rappo rt global CAP SC- REF 15 / Analy se de la straté 1. gie de Cash comm transf unicat er ion ID Con progr pour A- sult 40, Sub Cle 201 201 201 201 201 201 201 201 ams Po Op le H ant 000 mitt ar 7/08 7/09 7/10 7/10 7/11 7/11 7/12 8/06 and st en dével 83 Serv .00 ed ed /30 /13 /13 /18 /08 /22 /13 /11 acco oppe 50 ices mpan ment ying (C4D) meas des ures MA et définit ion d’un plan de comm July 9, 2010 unicat ion 2017- 2019 July 9, 2010 July 9, 2010 PROCUREMENT Mali : Emergency Safety Nets project (Jigiséméjiri) PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2017-12-06 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P127328 GPN Date: Project Name: Emergency Safety Nets project (Jigiséméjiri) Loan / Credit No: IDA / H8350, IDA / D3480 Emergency Safety Nets Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GO-REF 23 / Mobilier de bureau (1 grande table de Pending Request for Single Stage - One réunion, 30 chaises, 6 IDA / H8350 3. Project management Post Limited 20,000.00 0.00 Implementati 2017-11-04 2017-12-30 2018-06-28 Quotations Envelope bureaux, 10 fauteuils, 5 on réfrigérateurs) pour l'UTGFS GO-REF 24 / Matériels Pending informatiques pour UTGFS, Request for Single Stage - One IDA / H8350 3. Project management Post Open - National 115,000.00 0.00 Implementati 2017-04-23 2017-06-18 2017-12-15 RSU et Ministère protection Quotations Envelope on sociale DNDS et DNPSES ML-JIGISEMEJIRI-55573-GO- Pending Request for Single Stage - One RFQ / Acquérir des mobiliers IDA / H8350 3. Project management Post Open - National 80,000.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 Quotations Envelope et matériels de bureau on GO-REF 21 / Acquisition de Pending 30 ordinateurs portables et Request for Single Stage - One IDA / H8350 3. Project management Post Limited 52,000.00 0.00 Implementati 2017-10-25 2017-12-20 2018-06-18 16 imprimantes pour les ASL Quotations Envelope on de l'UTGFS ML-JIGISEMEJIRI-55576-GO- Pending RFQ / Acquisition de matériels Single Stage - One IDA / H8350 3. Project management Post Request for Bids Open - National 164,000.00 0.00 Implementati 2018-05-21 2018-05-26 2018-07-07 2018-08-06 2018-09-10 2019-03-09 informatiques et accessoires Envelope on pour UTGFS ML-JIGISEMEJIRI-109579-GO- Pending RFQ / Acquisition de matériel Request for Single Stage - One IDA / H8350 3. Project management Post Open - National 18,500.00 0.00 Implementati 2019-10-07 2019-12-02 2020-05-30 informatique et bureautique Quotations Envelope on pour l'UTGFS ML-JIGISEMEJIRI-109567-GO- Pending RFQ / Acquisition de mobilier 2. Establishment of a basic Request for Single Stage - One IDA / H8350 Post Open - National 46,000.00 0.00 Implementati 2019-06-24 2019-08-19 2020-02-15 de bureau pour l'UTGFS ( y safety net system Quotations Envelope on compris le RSU) ML-JIGISEMEJIRI-109538-GO- RFQ / Acquérir des équipements pour l’UTRSU (une imprimante 2. Establishment of a basic Request for Single Stage - One multifonction, 2 projecteurs, IDA / H8350 Post Open - National 37,000.00 27,588.41 Signed 2019-07-02 2019-08-27 2020-08-06 2020-02-23 safety net system Quotations Envelope 30 tablettes et accumulateur d’énergie multifonction) et du matériel informatique pour les antennes ML-JIGISEMEJIRI-109042-GO- RFQ / Acquérir 11 motos Pending 2. Establishment of a basic Request for Single Stage - One dont 4 pour les agents locaux IDA / H8350 Post Open - National 36,000.00 0.00 Implementati 2019-06-04 2019-07-30 2020-01-26 safety net system Quotations Envelope du RSU et 9 pour les ASL du on FA2 ML-JIGISEMEJIRI-109539-GO- Under RFQ / Acquérir 90 tablettes 1. Cash transfer program and Request for Single Stage - One IDA / H8350 Post Open - National 77,500.00 0.00 Implementati 2019-05-27 2019-07-22 2020-01-18 pour les équipes ONG en accompanying measures Quotations Envelope on charge des MA ML-JIGISEMEJIRI-109040-GO- RFQ / Acquérir 2 KITS (panneaux de brassage, Pending 2. Establishment of a basic Request for Single Stage - One serveurs, routeurs, tablettes IDA / H8350 Post Open - National 60,000.00 0.00 Implementati 2019-07-05 2019-08-30 2020-02-26 safety net system Quotations Envelope et onduleurs ) pour le on déploiement du RSU au niveau local ML-JIGISEMEJIRI-110002-GO- DIR / Acquisition matériels et matériaux pour les HIMO pour 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 387,709.00 343,689.01 Signed 2019-06-21 2020-04-01 2019-06-26 2020-04-01 2019-07-31 2020-04-17 2020-01-27 Niafounké et Youwarou par accompanying measures entente directe avec la société Global Distribution ML-JIGISEMEJIRI-109999-GO- DIR / Acquisition des matériels et matériaux pour Under les HIMO pour Niono et Nara 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 221,548.00 0.00 Implementati 2019-07-25 2019-11-28 2019-07-30 2019-08-20 2019-09-03 2020-03-01 2ème vague par entente accompanying measures on directe avec les Etablissements Garba Korkoss Super Vogue N°3 ML-JIGISEMEJIRI-160208-GO- Pending Request for Single Stage - One RFQ / Acquisition de mobilier IDA / D3480 3. Project management Post Open - National 5,539.00 0.00 Implementati 2020-04-14 2020-06-09 2020-12-06 Quotations Envelope de bureau pour UTGFS on Page 1 ML-JIGISEMEJIRI-160349-GO- Pending 2. Establishment of a basic Request for Single Stage - One RFQ / Acquisition de matériels IDA / D3480 Post Open - National 64,618.00 0.00 Implementati 2020-03-20 2020-05-15 2020-11-11 safety net system Quotations Envelope et logiciels pour le RSU on ML-JIGISEMEJIRI-160336-GO- Pending RFQ / Acquisition de matériels Request for Single Stage - One IDA / D3480 3. Project management Post Open - National 27,693.00 0.00 Implementati 2020-07-06 2020-08-31 2021-02-27 de bureau et matériels Quotations Envelope on informatique pour UTGFS ML-JIGISEMEJIRI-109038-GO- RFQ / Acquisition de matériels Request for Single Stage - One IDA / H8350 3. Project management Post Open - National 15,500.00 0.00 Canceled 2019-06-10 2019-08-05 2020-02-01 et mobilier de bureau pour Quotations Envelope les antennes + coffres fort ML-JIGISEMEJIRI-109535-GO- Single Stage - One RFB / Acquisition de véhicules IDA / H8350 3. Project management Post Request for Bids Open - National 301,000.00 0.00 Canceled 2019-07-29 2019-08-03 2019-09-14 2019-10-14 2019-11-18 2020-05-16 Envelope pour UTGFS et les antennes ML-JIGISEMEJIRI-109570-GO- RFQ / Installation réseau 2. Establishment of a basic Request for Single Stage - One IDA / H8350 Post Open - National 9,230.00 0.00 Canceled 2019-07-27 2019-09-21 2020-03-19 internet et téléphone pour 3 safety net system Quotations Envelope antennes ML-JIGISEMEJIRI-110206-GO- RFQ / Acquisition matériels et 1. Cash transfer program and Request for Single Stage - One IDA / H8350 Post Open - National 55,400.00 0.00 Canceled 2019-05-01 2019-06-26 2019-12-23 matériaux pour les HIMO pour accompanying measures Quotations Envelope Commune IV ML-JIGISEMEJIRI-109575-GO- Request for Single Stage - One RFQ / Acquisition de matériels IDA / H8350 3. Project management Post Open - National 7,500.00 0.00 Canceled 2019-07-06 2019-08-31 2020-02-27 Quotations Envelope de froid pour les antennes ML-JIGISEMEJIRI-119605-GO- DIR / Entente directe avec Solatraf Sarl pour l'acquisition 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 499,000.00 0.00 Canceled 2019-06-30 2019-07-05 2019-08-09 2020-02-05 des matériels et matériaux accompanying measures pour les HIMO pour Kita 2ème phase, Baraouéli et Kolokani. ML-JIGISEMEJIRI-110003-GO- DIR / Acquisition matériels et matériaux pour les HIMO pour 1. Cash transfer program and Gao, Koro et Bankass en IDA / H8350 Post Direct Selection Direct 498,482.00 0.00 Canceled 2019-06-30 2019-09-24 2019-07-05 2019-08-09 2020-02-05 accompanying measures entende directe avec l'Entreprise Bah Multi Services sarl. ML-JIGISEMEJIRI-55901-GO- 1. Cash transfer program and Community Driven CDD / Acquérir des matériels IDA / H8350 Prior Open - National 800,080.00 0.00 Canceled 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2019-04-18 accompanying measures Development pour 400 micro-projets HIMO ML-JIGISEMEJIRI-224884-GO- Pending RFQ / Acquisition des outils Request for Single Stage - One IDA / D3480 3. Project management Post Open - National 27,693.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 de Visio Conférence pour Quotations Envelope on l'UTGFS ML-JIGISEMEJIRI-224831-GO- RFQ / Acquisition des logiciels, consommables (les cartes) et d’outils pour l’extension des Pending 2. Establishment of a basic Request for Single Stage - One fonctionnalités de sauvegarde IDA / D3480 Post Open - National 55,387.00 0.00 Implementati 2021-05-08 2021-07-03 2021-12-30 safety net system Quotations Envelope et de sécurité du serveur on dédié : Windows server 2019, SQL Server 2019 Enterprise Edition, Microsoft Office Pro 2019 (pour RSU UTGFS) ML-JIGISEMEJIRI-224735-GO- Pending Request for Single Stage - One RFQ / Acquisition de Mobilier IDA / D3480 3. Project management Post Open - National 9,231.00 0.00 Implementati 2021-06-05 2021-07-31 2022-01-27 Quotations Envelope de bureau pour UTGFS on ML-JIGISEMEJIRI-224866-GO- Pending RFQ / Confection et 2. Establishment of a basic Request for Single Stage - One IDA / D3480 Post Open - National 18,462.00 0.00 Implementati 2021-07-05 2021-08-30 2022-02-26 impression des registres safety net system Quotations Envelope on d'enregistrement de plaintes ML-JIGISEMEJIRI-224869-GO- Pending 2. Establishment of a basic Request for Single Stage - One RFQ / Impression de 150 000 IDA / D3480 Post Open - National 41,540.00 0.00 Implementati 2021-06-10 2021-08-05 2022-02-01 safety net system Quotations Envelope récépissés RSU on ML-JIGISEMEJIRI-224885-GO- Pending RFQ / Acquisition de deux 2. Establishment of a basic Request for Single Stage - One IDA / D3480 Post Open - National 86,773.00 0.00 Implementati 2021-04-28 2021-06-23 2021-12-20 (02) kits RSU pour l'extension safety net system Quotations Envelope on au niveau local ML-JIGISEMEJIRI-55560-GO- RFQ / Acquisition de deux Request for Single Stage - One IDA / H8350 3. Project management Post Open - National 99,000.00 0.00 Canceled 2018-05-30 2018-07-25 2019-01-21 véhicules (un station wagon et Quotations Envelope un berline) pour UTGFS ML-JIGISEMEJIRI-110198-GO- RFB / Acquisition matériels et 1. Cash transfer program and Single Stage - One IDA / H8350 Post Request for Bids Limited 110,774.00 0.00 Canceled 2019-04-30 2019-05-05 2019-06-16 2019-07-16 2019-08-20 2020-02-16 matériaux pour les HIMO pour accompanying measures Envelope Diéma 2ème Phase ML-JIGISEMEJIRI-120163-GO- DIR / Acquisition de matériels et matériaux pour les HIMO 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 222,000.00 0.00 Canceled 2019-06-30 2019-07-05 2019-08-09 2020-02-05 pour Diéma et Nioro 2ème accompanying measures phase en entente directe avec la Malienne de Prestations ML-JIGISEMEJIRI-234148-GO- Pending 2. Establishment of a basic Request for Single Stage - One RFQ / Acquisition de matériels IDA / D3480 Post Open - National 64,618.00 0.00 Implementati 2021-05-25 2021-07-20 2022-01-16 safety net system Quotations Envelope et logiciels pour le RSU on NON CONSULTING SERVICES Page 2 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-JIGISEMEJIRI-120194-NC- DIR / Acquisition de la Pending nouvelle version du logiciel IDA / H8350 3. Project management Post Direct Selection Direct 18,400.00 0.00 Implementati 2019-07-07 2019-07-12 2019-08-16 2020-02-12 Tom²pro (nouvelle version et on Monitoring) ML-JIGISEMEJIRI-118044-NC- RFQ / Acquisition d'une connexion internet spéciale Pending pour la communication 2. Establishment of a basic Request for Single Stage - One IDA / H8350 Post Open - National 18,400.00 0.00 Implementati 2019-07-05 2019-08-30 2020-02-26 serveur dédié, serveur backup safety net system Quotations Envelope on RSU et d'une connexion pour le déploiement du RSU au niveau local. ML-JIGISEMEJIRI-118042-NC- Pending 2. Establishment of a basic Request for Single Stage - One RFQ / Acquérir des points IDA / H8350 Post Open - National 9,200.00 0.00 Implementati 2019-07-02 2019-08-27 2020-02-23 safety net system Quotations Envelope d’accès Wifi grande portée on ML-JIGISEMEJIRI-120199-GO- RFQ / Acquérir une licence Pending firewall, antivirus serveur, 2. Establishment of a basic Request for Single Stage - One IDA / H8350 Post Open - National 18,500.00 0.00 Implementati 2019-08-20 2019-10-15 2020-04-12 licence outil de réplication de safety net system Quotations Envelope on données, outils de collaboration Microsoft ML-JIGISEMEJIRI-180801-NC- RFP / Recrutement d’une Agence de Paiement pour les opérations de Transferts Monétaires, des indemnités Under 1. Cash transfer program and Request for Single Stage - One aux Comités Communaux et IDA / D3480 Post Open - National 486,122.00 0.00 Implementati 2020-07-05 2021-04-15 2020-07-10 2020-08-21 2020-09-20 2020-10-25 2021-04-23 accompanying measures Proposals Envelope Comités Villageois et de on Transferts Monétaires d'Urgence dans les communes des cercles de Gourmas Rarhous et de Goundam ML-JIGISEMEJIRI-180800-NC- RFP / Recrutement d’une Agence de Paiement pour les opérations de Transferts Monétaires, des indemnités Under 1. Cash transfer program and Request for Single Stage - One aux Comités Communaux et IDA / D3480 Post Open - National 449,873.00 0.00 Implementati 2020-07-01 2020-12-07 2020-07-06 2020-08-17 2020-09-16 2020-10-21 2021-04-19 accompanying measures Proposals Envelope Comités Villageois et de on Transferts Monétaires d'Urgence dans les communes des cercles d’Ansongo et de Bourem ML-JIGISEMEJIRI-180799-NC- RFP / Recrutement d'une agence de Paiement pour les opération de paiement des Under subventions AGR des frais de 1. Cash transfer program and Request for Single Stage - One IDA / D3480 Post Open - National 357,436.00 0.00 Implementati 2020-07-15 2020-12-07 2020-07-20 2020-08-31 2020-09-30 2020-11-04 2021-05-03 main d'œuvre HIMO et de accompanying measures Proposals Envelope on Transferts Monétaires d'Urgence dans les communes "Jigisèmèjiri" dans les régions de Sikasso et Ségou (fa2) ML-JIGISEMEJIRI-180796-NC- RFP / Recrutement d'une agence de Paiement pour les opération de paiement des subventions AGR, des frais de Under 1. Cash transfer program and Request for Single Stage - One main d'œuvre HIMO et de IDA / D3480 Post Open - National 366,648.00 0.00 Implementati 2020-07-07 2020-12-07 2020-07-12 2020-08-23 2020-09-22 2020-10-27 2021-04-25 accompanying measures Proposals Envelope Transferts Monétaires on d'Urgence dans les communes "Jigisèmèjiri" dans les régions de Kayes, Koulikoro, Mopti et Bamako ML-JIGISEMEJIRI-57962-NC- RFQ / impression de 1000 1. Cash transfer program and Request for Single Stage - One IDA / H8350 Post Open - National 60,000.00 0.00 Canceled 2018-05-29 2018-07-24 2019-01-20 kits C4D et outils HIMo/AGR accompanying measures Quotations Envelope pour les MA, PNP, AGR et HIMO ML-JIGISEMEJIRI-224460-NC- RFB / sélection d'une agence de paiement pour les opérations de transferts monétaires , des indemnités Pending 1. Cash transfer program and Single Stage - One aux comités communaux et IDA / D3480 Post Request for Bids Open - National 486,122.00 0.00 Implementati 2021-03-25 2021-03-30 2021-05-11 2021-06-10 2021-07-15 2022-01-11 accompanying measures Envelope aux comités villageois et de on transferts monétaires d'urgence dans les communes des cercles de gourme Rharous et de Goundam ML-JIGISEMEJIRI-224826-NC- RFB / Recruter une Agence de paiement pour le paiement Pending des opérations de transferts 1. Cash transfer program and Single Stage - One IDA / D3480 Post Request for Bids Open - National 76,140.00 0.00 Implementati 2021-06-01 2021-06-06 2021-07-18 2021-08-17 2021-09-21 2022-03-20 monétaires et des indemnités accompanying measures Envelope on aux CC et CV des 11 communes de la région de Kidal ML-JIGISEMEJIRI-224827-NC- Pending RFQ / Recrutement d'une 2. Establishment of a basic Request for Single Stage - One IDA / D3480 Post Open - National 27,693.00 0.00 Implementati 2021-05-05 2021-06-30 2021-12-27 firme pour la maintenance des safety net system Quotations Envelope on équipepments RSU - FA2 ML-JIGISEMEJIRI-225081-NC- RFB / Recrutement d’une Agence de Paiement pour les opérations de Transferts Monétaires, des indemnités Pending 1. Cash transfer program and Single Stage - One aux Comités Communaux et IDA / D3480 Post Request for Bids Open - National 486,122.00 0.00 Implementati 2021-03-23 2021-03-28 2021-05-09 2021-06-08 2021-07-13 2022-01-09 accompanying measures Envelope Comités Villageois et de on Transferts Monétaires d'Urgence dans les communes des cercles de Gourmas Rarhous et de Goundam Page 3 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SC-REF 19 / Etude de la Consultant migration de la base de 2. Establishment of a basic Under IDA / H8350 Post Qualification Open - National 100,000.00 0.00 2017-06-20 2017-04-14 2017-07-11 2017-08-24 2017-10-23 2017-09-23 2018-02-26 2017-10-28 2018-04-26 données Access vers le safety net system Implementation Selection moteur SQL ML-JIGISEMEJIRI-55892-CS- Consultant CQS / Evaluation du 1. Cash transfer program and Pending IDA / H8350 Post Qualification Open - National 30,000.00 0.00 2018-06-18 2018-07-09 2018-08-22 2018-09-21 2018-10-26 2019-04-24 processus de mise en œuvre accompanying measures Implementation Selection des MA et PNP ML-JIGISEMEJIRI-55896-CS- CQS / entente directe avec la Consultant BMS pour les opérations de 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 46,800.00 0.00 2018-06-04 2018-04-09 2018-06-25 2018-08-08 2018-09-07 2018-10-12 2019-04-10 paiement des transferts accompanying measures Implementation Selection monétaires dans la commune de Konna ML-JIGISEMEJIRI-109580-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and pour la conduite des AGR IDA / H8350 Post Qualification Open - National 295,397.00 0.00 Under Review 2019-05-07 2021-03-14 2019-05-28 2019-07-11 2019-08-10 2019-09-14 2020-03-12 accompanying measures dans les cercles de Koutiala et Selection de Yorossso ML-JIGISEMEJIRI-109544-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and Under pour la conduite des HIMO et IDA / H8350 Post Qualification Open - National 240,010.00 0.00 2019-07-26 2020-08-10 2019-08-16 2019-09-29 2019-10-29 2019-12-03 2020-05-31 accompanying measures Implementation AGR dans le cercle de Selection Kolokani du FA2 ML-JIGISEMEJIRI-109546-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 147,698.00 0.00 2019-07-09 2020-08-10 2019-07-30 2019-09-12 2019-10-12 2019-11-16 2020-05-14 pour la conduite des AGR accompanying measures Implementation Selection dans le cercle de Dioila du FA2 ML-JIGISEMEJIRI-109562-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and Under pour la conduite des HIMO et IDA / H8350 Post Qualification Open - National 240,010.00 0.00 2019-09-26 2020-08-10 2019-10-17 2019-11-30 2019-12-30 2020-02-03 2020-08-01 accompanying measures Implementation AGR dans le cercle de Diéma Selection du FA2 ML-JIGISEMEJIRI-109555-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 230,779.00 0.00 2019-06-27 2019-11-25 2019-07-18 2019-08-31 2020-09-10 2019-09-30 2019-11-04 2020-05-02 pour la conduite des MA dans accompanying measures Implementation Selection le Cercle de Bafoulabé - FA2 ML-JIGISEMEJIRI-109576-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 230,779.00 0.00 2019-06-27 2019-11-25 2019-07-18 2019-08-31 2020-09-10 2019-09-30 2019-11-04 2020-05-02 pour la conduite des MA dans accompanying measures Implementation Selection le Cercle de Kéniéba - FA2 ML-JIGISEMEJIRI-109578-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and Under pour la conduite des MA dans IDA / H8350 Post Qualification Open - National 230,779.00 0.00 2019-09-19 2019-10-16 2019-10-10 2019-11-23 2020-09-10 2019-12-23 2020-01-27 2020-07-25 accompanying measures Implementation le Cercle de Koulikoro central Selection - FA2 ML-JIGISEMEJIRI-109051-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / H8350 Post Qualification Open - National 230,779.00 0.00 Under Review 2019-11-27 2019-11-25 2019-12-18 2020-01-31 2020-03-01 2020-04-05 2020-10-02 pour la conduite des MA dans accompanying measures Selection le Cercle de Kati - FA2 ML-JIGISEMEJIRI-109557-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 230,779.00 0.00 2019-12-18 2019-11-25 2020-01-08 2020-02-21 2020-09-10 2020-03-22 2020-04-26 2020-10-23 pour la conduite des MA dans accompanying measures Implementation Selection le Cercle de Kadiolo - FA2 ML-JIGISEMEJIRI-109269-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 230,779.00 0.00 2019-12-18 2019-11-25 2020-01-08 2020-02-21 2020-09-10 2020-03-22 2020-04-26 2020-10-23 pour la conduite des MA dans accompanying measures Implementation Selection le Cercle de Bougouni - FA2 ML-JIGISEMEJIRI-109548-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 230,779.00 0.00 2020-01-20 2019-12-13 2020-02-10 2020-03-25 2020-11-16 2020-04-24 2020-05-29 2020-11-25 pour les MA dans le Cercle de accompanying measures Implementation Selection San ML-JIGISEMEJIRI-109568-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 230,779.00 0.00 2020-01-16 2019-12-13 2020-02-06 2020-03-21 2021-03-10 2020-04-20 2020-05-25 2020-11-21 pour la conduite des MA dans accompanying measures Implementation Selection le Cercle de Mopti - FA2 ML-JIGISEMEJIRI-109270-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 23,779.00 0.00 2020-01-31 2019-12-13 2020-02-21 2020-04-05 2020-09-10 2020-05-05 2020-06-09 2020-12-06 pour la conduite des MA dans accompanying measures Implementation Selection le Cercle de Djenné - FA2 ML-JIGISEMEJIRI-160197-CS- QCBS / Recrutement d’une AP pour le paiement des opérations de transferts 1. Cash transfer program and Quality And Cost- IDA / D3480 Post Open - National 449,873.00 0.00 Under Review 2020-03-01 2020-06-04 2020-03-22 2020-05-05 2020-06-02 2020-07-02 2020-08-06 2020-09-10 2021-09-10 monétaires et des indemnités accompanying measures Based Selection aux CC et CV dans les communes du cercle d’Ansongo et de Bourem ML-JIGISEMEJIRI-160352-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / D3480 Post Qualification Open - National 147,698.00 0.00 2020-04-24 2020-09-10 2020-05-15 2020-06-28 2020-07-28 2020-09-01 2021-02-28 pour les MA dans le Cercle de accompanying measures Implementation Selection Yélimané - région de Kayes ML-JIGISEMEJIRI-160213-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / D3480 Post Qualification Open - National 230,779.00 0.00 Under Review 2020-04-26 2020-09-10 2020-05-17 2020-06-30 2020-07-30 2020-09-03 2021-03-02 pour les MA dans le Cercle de accompanying measures Selection Douentza - région de Mopti Page 4 ML-JIGISEMEJIRI-160224-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / D3480 Post Qualification Open - National 230,779.00 0.00 Under Review 2020-04-26 2020-09-10 2020-05-17 2020-06-30 2020-07-30 2020-09-03 2021-03-02 pour les MA dans le Cercle de accompanying measures Selection Tenenkou - région de Mopti ML-JIGISEMEJIRI-160212-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / D3480 Post Qualification Open - National 230,779.00 0.00 Under Review 2020-04-28 2020-09-10 2020-05-19 2020-07-02 2020-08-01 2020-09-05 2021-03-04 pour les MA dans le Cercle de accompanying measures Selection Ansongo - région de Gao ML-JIGISEMEJIRI-160207-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / D3480 Post Qualification Open - National 230,779.00 0.00 Under Review 2019-07-30 2020-08-31 2019-08-20 2019-10-03 2019-11-02 2019-12-07 2020-06-04 pour les MA dans le Cercle de accompanying measures Selection Macina - région de Ségou ML-JIGISEMEJIRI-160347-CS- CQS / Recrutement d'un Consultant consultant pour mener l’étude 1. Cash transfer program and Under IDA / D3480 Post Qualification Open - National 18,462.00 0.00 2020-03-01 2020-06-25 2020-03-22 2020-05-05 2020-06-04 2020-07-09 2021-01-05 sur le processus de mise en accompanying measures Implementation Selection œuvre et l’impact des activités génératrices de revenu ML-JIGISEMEJIRI-160338-CS- Consultant CQS / Recrutement d'une Pending IDA / D3480 3. Project management Post Qualification Open - National 184,623.00 0.00 2020-07-20 2020-08-10 2020-09-23 2020-10-23 2020-11-27 2021-05-26 agence de Communication - Implementation Selection FA2 ML-JIGISEMEJIRI-160201-CS- QCBS / Recrutement d'une agence de Paiement pour les opération de paiement des subventions AGR et des frais 1. Cash transfer program and Quality And Cost- IDA / D3480 Post Open - National 366,648.00 0.00 Canceled 2020-03-20 2020-04-10 2020-05-24 2020-06-21 2020-07-21 2020-08-25 2020-09-29 2021-09-29 de main d'œuvre HIMO dans accompanying measures Based Selection les communes "Jigisèmèjiri" dans les régions de Kayes, Koulikoro, Mopti et le District de Bamako (fa2) ML-JIGISEMEJIRI-160210-CS- QCBS / Recrutement d'une agence de Paiement pour les opération de paiement des 1. Cash transfer program and Quality And Cost- subventions AGR et des frais IDA / D3480 Post Open - National 357,436.00 0.00 Canceled 2020-03-20 2020-04-10 2020-05-24 2020-06-21 2020-07-21 2020-08-25 2020-09-29 2021-09-29 accompanying measures Based Selection de main d'œuvre HIMO dans les communes "Jigisèmèjiri" dans les régions de Sikasso et Ségou (fa2) ML-JIGISEMEJIRI-160214-CS- QCBS / Recrutement d’une AP pour le paiement des opérations de transferts 1. Cash transfer program and Quality And Cost- monétaires et des indemnités IDA / D3480 Post Open - National 486,122.00 0.00 Canceled 2020-03-25 2020-04-15 2020-05-29 2020-06-26 2020-07-26 2020-08-30 2020-10-04 2021-10-04 accompanying measures Based Selection aux CC et CV dans les communes des cercles de Gourmas Rarhous et de Goundam ML-JIGISEMEJIRI-154164-CS- CQS / Etude d'évaluation du Consultant 2. Establishment of a basic processus de mise en œuvre IDA / D3480 Post Qualification Open - National 20,000.00 0.00 Canceled 2020-02-06 2020-06-25 2020-02-20 2020-04-04 2020-05-04 2020-06-08 2020-12-05 safety net system des transferts monétaires Selection d'urgence (TMU) ML-JIGISEMEJIRI-218934-CS- QCBS / Recrutement d'un auditeur externe au titre des Quality And Cost- Under IDA / D3480 3. Project management Post Open - National 55,000.00 0.00 2021-02-22 2021-03-03 2021-03-15 2021-05-07 2021-04-28 2021-05-07 2021-05-26 2021-06-25 2021-07-30 2021-09-03 2022-09-03 exercices 2020 - 2021- 2022 Based Selection Implementation pour le programme de filets sociaux SC-REF 16 / Etude sur la Consultant 2. Establishment of a basic faisabilité de l’enregistrement IDA / H8350 Post Qualification Open - National 20,000.00 0.00 Canceled 2017-08-17 2017-09-07 2017-10-21 2017-11-20 2017-12-25 2018-06-23 safety net system biométrique Selection SC-REF 17 / Etude sur le Consultant 1. Cash transfer program and processus de mise en œuvre IDA / H8350 Post Qualification Open - National 60,000.00 0.00 Canceled 2017-09-06 2017-09-27 2017-11-10 2017-12-10 2018-01-14 2018-07-13 accompanying measures des MA/PNP Selection ML-JIGISEMEJIRI-109278-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and pour la conduite des AGR IDA / H8350 Post Qualification Open - National 299,089.00 0.00 Canceled 2020-08-10 2020-08-31 2020-10-14 2020-11-13 2020-12-18 2021-06-16 accompanying measures dans le cercle de Kita et le Selection district de Bamako du FA2 ML-JIGISEMEJIRI-160346-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and pour les MA dans les Cercles IDA / D3480 Post Qualification Open - National 221,548.00 0.00 Canceled 2019-04-24 2020-09-10 2019-05-15 2019-06-28 2019-07-28 2019-09-01 2020-02-28 accompanying measures de Banamba et de Koulikoro - Selection région de Koulikoro ML-JIGISEMEJIRI-160351-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / D3480 Post Qualification Open - National 147,698.00 0.00 Canceled 2020-03-10 2020-09-10 2020-03-31 2020-05-14 2020-06-13 2020-07-18 2021-01-14 pour les MA dans le Cercle de accompanying measures Selection Yanfolila - région de Sikasso ML-JIGISEMEJIRI-110218-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and pour la conduite des HIMO et IDA / H8350 Post Qualification Open - National 240,010.00 0.00 Canceled 2019-07-02 2020-08-10 2019-07-23 2019-09-05 2019-10-05 2019-11-09 2020-05-07 accompanying measures AGR dans le cercle de Nara du Selection FA2 ML-JIGISEMEJIRI-109564-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and pour la conduite des HIMO et IDA / H8350 Post Qualification Open - National 240,010.00 0.00 Canceled 2019-07-29 2020-08-10 2019-08-19 2019-10-02 2019-11-01 2019-12-06 2020-06-03 accompanying measures AGR dans le cercle de Baroueli Selection du FA2 ML-JIGISEMEJIRI-109552-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / H8350 Post Qualification Open - National 147,698.00 0.00 Canceled 2019-07-08 2021-03-15 2019-07-29 2019-09-11 2019-10-11 2019-11-15 2020-05-13 pour la conduite des AGR accompanying measures Selection dans le cercle de Bla du FA2 Page 5 ML-JIGISEMEJIRI-224886-CS- Consultant 1. Cash transfer program and Under CQS / Recrutement d'une ONG IDA / D3480 Post Qualification Open - National 81,948.00 0.00 2021-05-17 2021-04-27 2021-06-07 2021-07-21 2021-08-20 2021-09-24 2022-03-23 accompanying measures Implementation pour les activités AGR à Diéma Selection ML-JIGISEMEJIRI-224719-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / D3480 Post Qualification Open - National 78,234.00 0.00 2021-03-31 2021-04-27 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2022-02-04 pour les activités AGR à Nioro accompanying measures Implementation Selection du Sahel ML-JIGISEMEJIRI-224815-CS- Consultant 1. Cash transfer program and Under CQS / Recrutement d'une ONG IDA / D3480 Post Qualification Open - National 76,472.00 0.00 2021-05-17 2021-04-27 2021-06-07 2021-07-21 2021-08-20 2021-09-24 2022-03-23 accompanying measures Implementation pour les activités AGR à Kita Selection ML-JIGISEMEJIRI-224876-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / D3480 Post Qualification Open - National 82,640.00 0.00 2021-05-08 2021-04-27 2021-05-29 2021-07-12 2021-08-11 2021-09-15 2022-03-14 pour les activités AGR à accompanying measures Implementation Selection Kolokani et Bamako ML-JIGISEMEJIRI-224828-CS- Consultant 1. Cash transfer program and Under CQS / Recrutement d'une ONG IDA / D3480 Post Qualification Open - National 60,926.00 0.00 2021-04-01 2021-04-27 2021-04-22 2021-06-05 2021-07-05 2021-08-09 2022-02-05 accompanying measures Implementation pour les activités AGR à Dioila Selection ML-JIGISEMEJIRI-224875-CS- Consultant 1. Cash transfer program and Under CQS / Recrutement d'une ONG IDA / D3480 Post Qualification Open - National 61,933.00 0.00 2021-05-08 2021-04-27 2021-05-29 2021-07-12 2021-08-11 2021-09-15 2022-03-14 accompanying measures Implementation pour les activités AGR à Nara Selection ML-JIGISEMEJIRI-224845-CS- Consultant 1. Cash transfer program and Under CQS / Recrutement d'une ONG IDA / D3480 Post Qualification Open - National 154,328.00 0.00 2021-05-03 2021-04-27 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 accompanying measures Implementation pour les activités AGR à Bla Selection ML-JIGISEMEJIRI-224852-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / H8350 Post Qualification Open - National 152,314.00 0.00 2021-04-05 2021-04-27 2021-04-26 2021-06-09 2021-07-09 2021-08-13 2022-02-09 pour les activités AGR à accompanying measures Implementation Selection Tominian ML-JIGISEMEJIRI-224819-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / D3480 Post Qualification Open - National 156,782.00 0.00 2021-04-01 2021-04-27 2021-04-22 2021-06-05 2021-07-05 2021-08-09 2022-02-05 pour les activités AGR à accompanying measures Implementation Selection Baraouéli ML-JIGISEMEJIRI-224849-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / D3480 Post Qualification Open - National 211,855.00 0.00 2021-04-05 2021-04-27 2021-04-26 2021-06-09 2021-07-09 2021-08-13 2022-02-09 pour les activités AGR à accompanying measures Implementation Selection Koutiala et Yorosso ML-JIGISEMEJIRI-224834-CS- Consultant 1. Cash transfer program and Under CQS / Recrutement d'une ONG IDA / D3480 Post Qualification Open - National 41,668.00 0.00 2021-04-01 2021-04-27 2021-04-22 2021-06-05 2021-07-05 2021-08-09 2022-02-05 accompanying measures Implementation pour les activités AGR à Koro Selection ML-JIGISEMEJIRI-224716-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / D3480 Post Qualification Open - National 57,464.00 0.00 2021-03-31 2021-04-27 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2022-02-04 pour les activités AGR à accompanying measures Implementation Selection Bankass ML-JIGISEMEJIRI-224847-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and Under IDA / D3480 Post Qualification Open - National 106,934.00 0.00 2021-04-05 2021-04-27 2021-04-26 2021-06-09 2021-07-09 2021-08-13 2022-02-09 pour les activités AGR à accompanying measures Implementation Selection Kolondiéba ML-JIGISEMEJIRI-109574-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / H8350 Post Qualification Open - National 147,698.00 0.00 Canceled 2019-05-03 2020-08-10 2019-05-24 2019-07-07 2019-08-06 2019-09-10 2020-03-08 pour la conduite des AGR accompanying measures Selection dans le cercle de Kolondieba ML-JIGISEMEJIRI-109563-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / H8350 Post Qualification Open - National 147,698.00 0.00 Canceled 2019-07-18 2020-08-10 2019-08-08 2019-09-21 2019-10-21 2019-11-25 2020-05-23 pour la conduite des AGR accompanying measures Selection dans le cercle de Tominian du FA2 ML-JIGISEMEJIRI-160215-CS- Consultant CQS / Recrutement d'une 2. Establishment of a basic IDA / D3480 Post Qualification Open - National 27,693.00 0.00 Canceled 2020-05-15 2020-06-05 2020-07-19 2020-08-18 2020-09-22 2021-03-21 firme pour la maintenance des safety net system Selection équipepments RSU - FA2 ML-JIGISEMEJIRI-134018-CS- QCBS / Recrutement d'un Auditeur externe au titre des Quality And Cost- IDA / H8350 3. Project management Post Open - National 55,000.00 0.00 Canceled 2019-09-20 2020-07-22 2019-10-11 2019-12-04 2019-11-24 2020-01-21 2019-12-22 2020-02-21 2020-01-21 2020-05-07 2020-02-25 2020-03-31 2021-03-31 exercices 2019 - 2020- 2021 Based Selection pour le programme de filets sociaux ML-JIGISEMEJIRI-160345-CS- Consultant CQS / Recrutement d'une ONG 1. Cash transfer program and IDA / D3480 Post Qualification Open - National 110,774.00 0.00 Canceled 2020-04-30 2020-09-10 2020-05-21 2020-07-04 2020-08-03 2020-09-07 2021-03-06 pour les MA dans la accompanying measures Selection Commune IV de Bamako ML-JIGISEMEJIRI-109277-CS- CQS / Recrutement d'une ONG Consultant 1. Cash transfer program and pour la conduite des HIMO et IDA / H8350 Post Qualification Open - National 240,010.00 0.00 Canceled 2019-09-18 2020-08-10 2019-10-09 2019-11-22 2019-12-22 2020-01-26 2020-07-24 accompanying measures AGR dans le cercle de Nioro Selection du FA2 ML-JIGISEMEJIRI-55390-CS- Consultant CQS / Conduite des 1. Cash transfer program and IDA / H8350 Post Qualification Open - National 300,000.00 0.00 Canceled 2018-06-17 2018-07-08 2018-08-21 2018-09-20 2018-10-25 2019-04-23 Opérations de MA, AGR et accompanying measures Selection HIMO à Konna ML-JIGISEMEJIRI-231751-CS- CQS / RECRUTEMENT D’UNE ONG POUR LA MISE EN ŒUVRE DES ACTIVITES GENERATRICES Consultant 1. Cash transfer program and Under DE REVENUS DANS LE CADRE IDA / D3480 Post Qualification Open - National 62,000.00 0.00 2021-05-18 2021-05-20 2021-06-08 2021-07-22 2021-08-21 2021-09-25 2022-03-24 accompanying measures Implementation DU PROJET Selection « EMPLOI JEUNES » DANS LE CERCLE DE YOUWAROU, REGION DE MOPTI INDIVIDUAL CONSULTANTS Page 6 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SC-REF 18 / Opérations de paiement des TM, des indemnités aux CC et CV par 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 18,000.00 0.00 2017-05-22 2017-06-01 2017-08-05 2018-02-01 la BMS dans la commune III accompanying measures Implementation du district de Bamako pendant 1 an SC-REF 20 / Opérations de paiements sur 1 an des TM et 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 78,000.00 0.00 2017-03-25 2017-04-04 2017-06-08 2017-12-05 des indemnités aux CC et CV accompanying measures Implementation par la BNDA (Sikasso pilotes ) SC-REF 2 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-04-22 2017-05-02 2017-07-06 2018-01-02 PNP par l'ONG JIEKATAANIE accompanying measures dans le cercle de Kolondiéba SC-REF 1 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-04-25 2017-05-05 2017-07-09 2018-01-05 PNP par l'ONG CAES dans le accompanying measures cercle de Yorosso SC-REF 3 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-04-22 2017-05-02 2017-07-06 2018-01-02 PNP par l'ONG CAES dans accompanying measures le cercle de Koutiala SC-REF 13 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-05-21 2017-05-31 2017-08-04 2018-01-31 PNP par l'ONG CERDEPE accompanying measures dans le cercle de Tominian SC-REF 11 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-05-20 2017-05-30 2017-08-03 2018-01-30 PNP par l'ONG RESERD-Mali accompanying measures dans le cercle de Bankass SC-REF 10 / Conduite des activités supplémentaires de 1. Cash transfer program and PNP par le Consortium ADAC- IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-04-15 2017-04-25 2017-06-29 2017-12-26 accompanying measures GAE Sahel- OMAFES dans le cercle de Youwarou SC-REF 9 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-06-06 2017-06-16 2017-08-20 2018-02-16 PNP par l'ONG STOP – SAHEL accompanying measures dans le cercle de Kita SC-REF 8 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-05-03 2017-05-13 2017-07-17 2018-01-13 PNP par l'Association ADG accompanying measures dans le cercle de Diéma SC-REF 7 / Conduite des activités supplémentaires de 1. Cash transfer program and PNP par l'Association ADG IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-05-03 2017-05-13 2017-07-17 2018-01-13 accompanying measures dans le cercle de Nioro du Sahel SC-REF 6 / Conduite des activités supplémentaires de 1. Cash transfer program and PNP par le Consortium IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-05-01 2017-05-11 2017-07-15 2018-01-11 accompanying measures CARRES (ONG CAR.D et RESERD-Mali) dans le cercle de Kolokani SC-REF 5 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-04-28 2017-05-08 2017-07-12 2018-01-08 PNP par l'ONG CSPEEDA dans accompanying measures le cercle de NARA SC-REF 4 / Conduite des activités supplémentaires de 1. Cash transfer program and PNP par le consortium ADAC- IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-04-30 2017-05-10 2017-07-14 2018-01-10 accompanying measures GAE SAHEL- OMAFES dans le cercle de DIOILA SC-REF 12 / Conduite des activités supplémentaires de 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 7,700.00 0.00 Canceled 2017-05-20 2017-05-30 2017-08-03 2018-01-30 PNP par l'ONG OMAES dans le accompanying measures cercle de Baraoueli ML-JIGISEMEJIRI-55551-CS- INDV / consultant statisticien Individual 1. Cash transfer program and Pending pour la conduite des enquêtes IDA / H8350 Post Consultant Open 9,600.00 0.00 2018-07-23 2018-09-10 2018-10-01 2018-11-05 2019-05-04 accompanying measures Implementation et l’analyse des données Selection (6mois) ML-JIGISEMEJIRI-55410-CS- CDS / entente directe avec l'ONG CAES pour les 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 60,000.00 0.00 2018-06-25 2018-07-05 2018-09-08 2019-03-07 opérations MA et PNP dans accompanying measures Implementation les Communes PNP et de Contrôle de Yorosso ML-JIGISEMEJIRI-55891-CS- CDS / entente directe avec l'ONG Jièkataaniè pour les 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 60,000.00 0.00 2018-07-05 2018-07-15 2018-09-18 2019-03-17 opérations MA et PNP dans accompanying measures Implementation les Communes PNP et de Contrôle de Kolondiéba ML-JIGISEMEJIRI-55416-CS- CDS / entente directe avec le Consortium ADAC-OMAFES- 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 40,000.00 33,770.10 Signed 2018-06-17 2018-07-16 2018-06-27 2018-10-02 2018-08-31 2019-02-14 2019-02-27 GAE SAHEL les opérations MA accompanying measures et PNP dans les Communes PNP et de Contrôle de Dioila Page 7 ML-JIGISEMEJIRI-55888-CS- CDS / entente directe avec l'ONG CSPEEDA pour les 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 40,000.00 0.00 2018-07-20 2018-07-30 2018-10-03 2019-04-01 opérations MA et PNP dans accompanying measures Implementation les Communes PNP et de Contrôle de Nara ML-JIGISEMEJIRI-55394-CS- CDS / Entente Directe avec l' ONG STOP SAHEL pour la 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 30,000.00 0.00 2018-06-29 2018-07-09 2018-09-12 2019-03-11 conduite des opérations MA accompanying measures Implementation et PNP dans les Communes PNP et de Contrôle de Kita ML-JIGISEMEJIRI-55549-CS- CDS / entente directe avec l' ONG ADG pour les opérations 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 30,000.00 0.00 2018-07-17 2018-07-27 2018-09-30 2019-03-29 MA et PNP dans les accompanying measures Implementation Communes PNP et de Contrôle de Diéma ML-JIGISEMEJIRI-55883-CS- CDS / entente directe avec l' ONG ADG pour les opérations 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 30,000.00 0.00 2018-07-27 2018-08-06 2018-10-10 2019-04-08 MA et PNP dans les accompanying measures Implementation Communes PNP et de Contrôle de Nioro du Sahel ML-JIGISEMEJIRI-78027-CS- CDS / Entente directe avec 1. Cash transfer program and Pending l'ONG STOP SAHEL pour le IDA / H8350 Post Direct Selection Direct 45,803.00 0.00 2018-10-25 2018-11-04 2019-01-08 2019-07-07 accompanying measures Implementation paiement des transferts monétaires d'urgence à Gao. ML-JIGISEMEJIRI-109547-CS- CDS / ED avec la BMS pour les opérations de paiements 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 883,442.00 0.00 2019-06-18 2019-06-28 2019-09-01 2020-02-28 des TM et des indemnités aux accompanying measures Implementation CC et CV des régions de Kayes, Mopti, Koulikoro ML-JIGISEMEJIRI-109268-CS- CDS / ED avec la BNDA pour les opérations de paiements 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 419,094.00 0.00 2019-07-01 2019-07-11 2019-09-14 2020-03-12 des TM et des indemnités aux accompanying measures Implementation CC et CV des régions de Sikasso et Ségou  ML-JIGISEMEJIRI-109274-CS- CDS / ED avec BMS sa pour le paiement des subventions AGR et des frais de main 1. Cash transfer program and Pending d'œuvre HIMO dans les IDA / H8350 Post Direct Selection Direct 254,780.00 0.00 2019-06-19 2019-06-29 2019-09-02 2020-02-29 accompanying measures Implementation communes "Jigisèmèjiri" dans les régions de Kayes, Koulikoro, Mopti et le District de Bamako (fa2) ML-JIGISEMEJIRI-109550-CS- CDS / ED avec BNDA sa pour le paiement des subventions AGR et des frais de main 1. Cash transfer program and Pending IDA / H8350 Post Direct Selection Direct 330,475.00 0.00 2019-06-21 2019-07-01 2019-09-04 2020-03-02 d'œuvre HIMO dans les accompanying measures Implementation communes "Jigisèmèjiri" dans les régions de Sikasso et Ségou (fa2) ML-JIGISEMEJIRI-109537-CS- INDV / Recruter un consultant individuel pour conduire Individual 1. Cash transfer program and l’étude sur l’élaboration des IDA / H8350 Post Consultant Open 37,000.00 0.00 Under Review 2019-07-30 2019-09-18 2019-09-17 2019-10-08 2019-11-12 2020-05-10 accompanying measures normes et procédures des Selection opérations MA en matière de filets sociaux  ML-JIGISEMEJIRI-109266-CS- INDV / Recruter un consultant individuel pour conduire Individual 1. Cash transfer program and Pending l’étude sur l’élaboration des IDA / H8350 Post Consultant Open 40,000.00 0.00 2019-07-31 2019-09-18 2019-10-09 2019-11-13 2020-05-11 accompanying measures Implementation normes et procédures des Selection opérations MA en matière de filets sociaux ML-JIGISEMEJIRI-110183-CS- CDS / Recrutement par 1. Cash transfer program and Pending Entente directe de l'ONG IDA / H8350 Post Direct Selection Direct 20,000.00 0.00 2019-07-03 2019-07-13 2019-09-16 2020-03-14 accompanying measures Implementation CSPEEDA pour l'achèvement des HIMO à Nara du FA1 ML-JIGISEMEJIRI-109542-CS- CDS / ED avec l'ONG STOP SAHEL pour les opérations de paiements des TM, des 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 232,625.00 203,057.35 Signed 2019-06-06 2019-06-05 2019-06-16 2019-06-06 2019-08-20 2020-02-25 2020-02-16 indemnités aux CC et CV et accompanying measures des frais de main d'œuvre HIMO dans le cercle de GAO (Projet parent et DFID) ML-JIGISEMEJIRI-109565-CS- INDV / Etude sur le processus Individual 1. Cash transfer program and de mise en œuvre des IDA / H8350 Post Consultant Open 37,000.00 0.00 Canceled 2019-04-30 2019-06-18 2019-07-09 2019-08-13 2020-02-09 accompanying measures activités génératrice de Selection revenus ML-JIGISEMEJIRI-109271-CS- INDV / Etude sur la mise en Individual 1. Cash transfer program and œuvre des TMU et IDA / H8350 Post Consultant Open 3,700.00 0.00 Canceled 2019-05-17 2019-07-05 2019-07-26 2019-08-30 2020-02-26 accompanying measures l’appréciation des Selection bénéficiaires ML-JIGISEMEJIRI-160348-CS- INDV / Recrutement d'un Individual consultant individuel pour 1. Cash transfer program and Pending IDA / D3480 Post Consultant Open 18,462.00 0.00 2020-05-25 2020-07-13 2020-08-03 2020-09-07 2021-03-06 mener l'étude sur le processus accompanying measures Implementation Selection et les effets des Transferts monétaires d'urgence (TMU) Page 8 ML-JIGISEMEJIRI-160350-CS- INDV / Recrutement d'un Individual consultant individuel pour Under IDA / D3480 3. Project management Post Consultant Open 18,462.00 0.00 2020-06-10 2021-03-10 2020-07-29 2020-08-19 2020-09-23 2021-03-22 mener l’étude d’évaluation du Implementation Selection processus de mise en œuvre des THIMO ML-JIGISEMEJIRI-160337-CS- Individual INDV / Recruter un consultant Under IDA / D3480 3. Project management Post Consultant Open 18,462.00 0.00 2020-04-29 2020-10-15 2020-06-17 2020-07-08 2020-08-12 2021-02-08 individuel pour l'élaboration Implementation Selection du rapport d’achèvement ML-JIGISEMEJIRI-109048-CS- INDV / Recruter un Consultant Individual individuel pour élaborer le IDA / H8350 3. Project management Post Consultant Open 46,000.00 0.00 Canceled 2019-05-28 2021-03-10 2019-07-16 2019-08-06 2019-09-10 2020-03-08 rapport d’achèvement du Selection Programme ML-JIGISEMEJIRI-160222-CS- INDV / Recrutement d'un consultant individuel pour Individual l'Elaboration d’un plan de 2. Establishment of a basic Pending IDA / D3480 Post Consultant Open 18,462.00 0.00 2020-05-10 2020-06-28 2020-07-19 2020-08-23 2021-02-19 prévention et de gestion des safety net system Implementation Selection risques d’insécurité liés aux activités du projet dans ses zones d’intervention ML-JIGISEMEJIRI-160220-CS- INDV / Recrutement d'un Individual 1. Cash transfer program and Pending consultant individuel pour IDA / D3480 Post Consultant Open 18,462.00 0.00 2020-06-18 2020-08-06 2020-08-27 2020-10-01 2021-03-30 accompanying measures Implementation Mener l’étude sur le processus Selection de mise en œuvre des MA ML-JIGISEMEJIRI-185877-CS- CDS / Recrutement du Groupement KMC /Pyramis pour mener l'audit financier et IDA / D3480 3. Project management Prior Direct Selection Direct 8,250.00 7,635.34 Signed 2020-07-28 2020-08-20 2020-08-07 2020-12-14 2020-10-11 2021-01-11 2021-04-09 comptable de l'exercice 2019 du programme de filets sociaux ML-JIGISEMEJIRI-109573-CS- INDV / Etude sur la Individual 1. Cash transfer program and capitalisation des activités du IDA / H8350 Post Consultant Open 3,700.00 0.00 Canceled 2019-05-07 2019-06-25 2019-07-16 2019-08-20 2020-02-16 accompanying measures programme: TM, MA, PNP, Selection HIMO et AGR ML-JIGISEMEJIRI-110181-CS- CDS / Recrutement par 1. Cash transfer program and Entente Directe de l'ONG IDA / H8350 Post Direct Selection Direct 22,500.00 0.00 Canceled 2019-07-04 2019-07-14 2019-09-17 2020-03-15 accompanying measures OMAES pour l'achèvement du HIMO FA1 à Baroueli ML-JIGISEMEJIRI-109569-CS- INDV / Recruter un consultant individuel pour l’analyse de la Individual 1. Cash transfer program and stratégie de communication IDA / H8350 Post Consultant Open 37,000.00 0.00 Canceled 2019-06-11 2019-09-19 2019-07-30 2019-08-20 2019-09-24 2020-03-22 accompanying measures pour le développement (C4D) Selection des MA et définition d’un plan de communication 2019-21  ML-JIGISEMEJIRI-109581-CS- CDS / Recrutement en ED du Consortium ADICO-GAAS Mali 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 175,392.00 0.00 Canceled 2019-05-01 2019-05-11 2019-07-15 2020-01-11 pour l'achèvement du HIMO accompanying measures FA1 et la conduite des AGR du projet emploi jeune à Koro ML-JIGISEMEJIRI-109034-CS- INDV / Recruter un consultant individuel pour mener l’étude sur le recueil des Individual 1. Cash transfer program and normes et procédures des IDA / H8350 Post Consultant Open 37,000.00 0.00 Canceled 2019-07-03 2019-08-21 2019-09-11 2019-10-16 2020-04-13 accompanying measures opérations de MA dans le Selection cadre des Filets Sociaux en matière de nutrition et de la petite enfance ML-JIGISEMEJIRI-78026-CS- INDV / Recrutement d'un Individual consultant individuel pour 1. Cash transfer program and IDA / H8350 Post Consultant Open 30,000.00 0.00 Canceled 2018-10-28 2018-12-16 2019-01-06 2019-02-10 2019-08-09 finaliser la revue nationale sur accompanying measures Selection le mécanisme du FbF et PSA et préparer le plan d’actions Mali ML-JIGISEMEJIRI-55532-CS- INDV / Consultant nutritionniste pour la Individual 1. Cash transfer program and compilation des résultats des IDA / H8350 Post Consultant Open 40,000.00 0.00 Canceled 2018-07-28 2018-09-15 2018-10-06 2018-11-10 2019-05-09 accompanying measures enquêtes CAP des 18 zones Selection d’intervention et rédaction du rapport global CAP ML-JIGISEMEJIRI-55413-CS- INDV / Etude d'Appréciation Individual 1. Cash transfer program and des 1ières dotations PNP par IDA / H8350 Post Consultant Open 20,000.00 0.00 Canceled 2018-06-20 2018-08-08 2018-08-29 2018-10-03 2019-04-01 accompanying measures les populations et les services Selection techniques SC-REF 15 / Analyse de la stratégie de communication Individual 1. Cash transfer program and pour le développement (C4D) IDA / H8350 Post Consultant Open 40,000.00 0.00 Canceled 2017-08-30 2017-10-18 2017-11-08 2017-12-13 2018-06-11 accompanying measures des MA et définition d’un plan Selection de communication 2017- 2019 SC-REF 14 / Compilation des résultats des enquêtes CAP Individual 1. Cash transfer program and des 18 zones d’intervention et IDA / H8350 Post Consultant Open 40,000.00 0.00 Canceled 2017-09-15 2017-11-03 2017-11-24 2017-12-29 2018-06-27 accompanying measures rédaction du rapport global Selection CAP Page 9 ML-JIGISEMEJIRI-55540-CS- INDV / Analyse stratégie de communication pour le Individual développement (C4D) des MA 1. Cash transfer program and IDA / H8350 Post Consultant Open 40,000.00 0.00 Canceled 2018-06-30 2018-08-18 2018-09-08 2018-10-13 2019-04-11 et définition d’un plan de accompanying measures Selection communication 2017-2019 Plan de Communication sur MA (C4D) ML-JIGISEMEJIRI-55587-CS- INDV / Recruter un consultant Individual pour le suivi de la mise en 1. Cash transfer program and IDA / H8350 Post Consultant Open 30,000.00 0.00 Canceled 2018-07-20 2018-09-07 2018-09-28 2018-11-02 2019-05-01 œuvre du cadre de gestion et accompanying measures Selection de sauvegarde environnementale (HIMO) ML-JIGISEMEJIRI-55419-CS- INDV / élaboration d'un Individual recueil des normes et 1. Cash transfer program and IDA / H8350 Post Consultant Open 30,000.00 0.00 Canceled 2018-06-17 2018-08-05 2018-08-26 2018-09-30 2019-03-29 procédures des opérations de accompanying measures Selection MA en matière de Filets Sociaux ML-JIGISEMEJIRI-78022-CS- CDS / Entente directe avec la Banque Malienne de Solidarité 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 170,045.00 0.00 Canceled 2018-10-25 2018-09-25 2018-11-04 2019-01-08 2019-07-07 (BMS) sa pour le paiement des accompanying measures transferts monétaires d'urgence à Kayes et Mopti ML-JIGISEMEJIRI-55904-CS- CDS / entente directe avec le Consortium CARRES pour les 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 40,000.00 0.00 Canceled 2018-07-10 2018-07-16 2018-07-20 2018-09-23 2019-03-22 opérations MA et PNP dans accompanying measures les Communes PNP et de Contrôle de Kolokani ML-JIGISEMEJIRI-109275-CS- CDS / Recrutement en ED de l'ONG RESERD pour 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 175,392.00 0.00 Canceled 2019-05-01 2019-05-11 2019-07-15 2020-01-11 l'achèvement du HIMO FA1 et accompanying measures la conduite des AGR du projet emploi jeune à Bankass ML-JIGISEMEJIRI-109561-CS- CDS / Recrutement en ED du Consortium ADAC - OMAFES - 1. Cash transfer program and GAE SAHEL pour l'achèvement IDA / H8350 Post Direct Selection Direct 175,392.00 0.00 Canceled 2019-05-01 2019-05-11 2019-07-15 2020-01-11 accompanying measures du HIMO FA1 et la conduite des AGR du projet emploi jeune à Youwarou ML-JIGISEMEJIRI-110193-CS- CDS / Recrutement par 1. Cash transfer program and entente Directe de l'ONG IDA / H8350 Post Direct Selection Direct 20,000.00 0.00 Canceled 2019-07-02 2019-07-12 2019-09-15 2020-03-13 accompanying measures Jièkataaniè pour l'achèvement du HIMO FA1 à Niono ML-JIGISEMEJIRI-110186-CS- CDS / Recrutement par 1. Cash transfer program and entente directe du Consortium IDA / H8350 Post Direct Selection Direct 20,000.00 0.00 Canceled 2019-07-02 2019-07-12 2019-09-15 2020-03-13 accompanying measures CARRES pour l'achèvement des HIMO à Kolokani du FA1 ML-JIGISEMEJIRI-110194-CS- CDS / Recrutement par 1. Cash transfer program and Entente Directe de l'ONG ADG IDA / H8350 Post Direct Selection Direct 61,000.00 0.00 Canceled 2019-06-30 2019-07-10 2019-09-13 2020-03-11 accompanying measures pour l'achèvement des HIMO à Nioro et Diéma du FA1 ML-JIGISEMEJIRI-109591-CS- CDS / Recrutement par 1. Cash transfer program and Entente Directe de l'ONG STOP IDA / H8350 Post Direct Selection Direct 58,000.00 0.00 Canceled 2019-06-30 2019-07-10 2019-09-13 2020-03-11 accompanying measures SAHEL pour l'achèvement des HIMO à Gao et Kita du FA1 ML-JIGISEMEJIRI-78025-CS- CDS / Entente directe avec le Banque Nationale de 1. Cash transfer program and Développement Agricole IDA / H8350 Post Direct Selection Direct 27,024.00 0.00 Canceled 2018-10-25 2018-11-04 2018-09-11 2019-01-08 2019-07-07 accompanying measures (BNDA) pour le paiement des transferts monétaires d'urgence à Ségou (Tominian) ML-JIGISEMEJIRI-55584-CS- CDS / entente directe avec l'ONG CAES pour les 1. Cash transfer program and IDA / H8350 Post Direct Selection Direct 60,000.00 0.00 Canceled 2018-05-31 2018-06-10 2018-08-14 2019-02-10 opérations MA et PNP dans accompanying measures les Communes PNP et de Contrôle de Koutiala ML-JIGISEMEJIRI-109558-CS- INDV / Recruter un consultant individuel nutritionniste pour Individual 1. Cash transfer program and la compilation des résultats IDA / H8350 Post Consultant Open 37,000.00 0.00 Canceled 2019-06-30 2019-08-18 2019-09-08 2019-10-13 2020-04-10 accompanying measures des enquêtes CAP des 18 Selection zones d’intervention et rédiger le rapport. ML-JIGISEMEJIRI-61497-CS- CDS / RECRUTEMENT DU CABINET PYRAMIS PAR ENTENTE DIRECTE DANS LE CADRE DE L'AUDIT DES AGENCES DE PAIEMENT DES IDA / H8350 3. Project management Post Direct Selection Direct 40,000.00 0.00 Canceled 2018-05-09 2018-05-19 2018-07-23 2019-01-19 TRANSFERTS MONETAIRES , DES AGR DU PROGRAMME DE FILETS SOCIAUX « Jigisèmèjiri » AU TITRE DES EXERCICES 2015 - 2016 et 2017 ML-JIGISEMEJIRI-55412-CS- Individual INDV / Recrutement d'un Asl IDA / H8350 3. Project management Post Consultant Open 11,000.00 0.00 Canceled 2018-06-28 2018-08-16 2018-09-06 2018-10-11 2019-04-09 pour GAO Selection Page 10 ML-JIGISEMEJIRI-234146-CS- Individual INDV / Recrutement d'un Pending IDA / D3480 3. Project management Post Consultant Open 11,000.00 0.00 2021-05-11 2021-06-29 2021-07-20 2021-08-24 2022-02-20 Agent de Suivi Liaison ASL Implementation Selection pour Bourem ML-JIGISEMEJIRI-234147-CS- Individual INDV / Recrutement d'un Pending IDA / D3480 3. Project management Post Consultant Open 11,000.00 0.00 2021-05-11 2021-06-29 2021-07-20 2021-08-24 2022-02-20 Agent de Suivi Liaison ASL Implementation Selection pour Djenné ML-JIGISEMEJIRI-234149-CS- INDV / Recrutement d'un Individual Pending Agent de Suivi Liaison ASL IDA / D3480 3. Project management Post Consultant Open 11,000.00 0.00 2021-05-17 2021-07-05 2021-07-26 2021-08-30 2022-02-26 Implementation pour Gourma Rharous - Selection région de Tombouctou ML-JIGISEMEJIRI-234152-CS- Individual INDV / Recrutement d'un Pending IDA / D3480 3. Project management Post Consultant Open 11,000.00 0.00 2021-06-10 2021-07-29 2021-08-19 2021-09-23 2022-03-22 Agent de Suivi Liaison ASL Implementation Selection pour Goundam Page 11 PROCUREMENT PLAN (Textual Part) Project information: Mauritania Basic Education Support Project – Phase 2 P163143 Project Implementation agency: Direction des Projets Education et Formation Date of the Procurement Plan: February 17, 2020 Period covered by this Procurement Plan: February 19, 2020 – October 30, 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Mauritania : MAURITANIA - Basic Education Sector Support Project - Phase 2 PLAN General Information Country: Mauritania Bank’s Approval Date of the Original Procurement Plan: 2020-02-19 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163143 GPN Date: Project Name: MAURITANIA - Basic Education Sector Support Project - Phase 2 Loan / Credit No: / , IDA / V3120, IDA / D7360 Mauritania Basic Education Sector Support Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MR-BESSP-222829-CW-RFB / Construction de 56 salles de Component 2: Improving Under Single Stage - One 2021-12- classe équipées en 5 lots IDA / V3120 education service delivery in Post Request for Bids Open - National 1,075,697.00 0.00 Implementat 2021-03-15 2021-06-10 2021-03-20 2021-06-10 2021-05-04 2021-05-19 2021-06-08 Envelope 05 indépendants dans la wilaya selected regions ion du Hodh Echarghi . MR-BESSP-222833-CW-RFB / Construction de 54 salles de Component 2: Improving Under Single Stage - One 2021-11- classe en 3 lots indépendants IDA / V3120 education service delivery in Post Request for Bids Open - National 1,038,573.00 0.00 Implementat 2021-03-15 2021-06-10 2021-03-20 2021-06-10 2021-05-04 2021-05-05 2021-05-20 Envelope 16 dans la wilaya du Hodh El selected regions ion Gharbi. MR-BESSP-222836-CW-RFB / Component 2: Improving Under Construction de 42 salles de Single Stage - One 2021-12- IDA / V3120 education service delivery in Post Request for Bids Open - National 852,062.00 0.00 Implementat 2021-03-15 2021-06-10 2021-03-20 2021-06-10 2021-05-04 2021-05-19 2021-06-08 classe en 4 lots indépendants Envelope 05 selected regions ion dans la wilaya de l'Assaba, MR-BESSP-222838-CW-RFB / Component 2: Improving Under Construction de 40 salles de Single Stage - One 2021-12- IDA / V3120 education service delivery in Post Request for Bids Open - National 742,475.00 0.00 Implementat 2021-03-15 2021-06-10 2021-03-20 2021-06-10 2021-05-04 2021-05-19 2021-06-08 classe en 4 lots indépendants Envelope 05 selected regions ion dans la wilaya du Guidimagha. MR-BESSP-222840-CW-RFB / Component 2: Improving Under Construction de 50 salles de Single Stage - One 2021-12- IDA / V3120 education service delivery in Post Request for Bids Open - National 928,094.00 0.00 Implementat 2021-03-15 2021-06-10 2021-03-20 2021-06-10 2021-05-04 2021-05-19 2021-06-08 classe en 4 lots indépendants Envelope 05 selected regions ion dans la wilaya du Gorgol. MR-BESSP-223595-CW-RFB / Component 2: Improving Under Single Stage - One 2021-10- Construction de 10 salles de IDA / V3120 education service delivery in Post Request for Bids Open - National 170,548.00 0.00 Implementat 2021-03-24 2021-05-10 2021-03-29 2021-05-10 2021-04-28 2021-05-19 2021-06-13 Envelope 11 classes à Nouckchott-SUD selected regions ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-BESSP-161843-GO-RFQ Component 1: Transforming / Un onduleur pour la Pending teacher management using Request for Single Stage - One plateforme du SIGE à la / Post Limited 5,000.00 0.00 Implementati 2020-03-20 2020-05-15 2020-11-11 accountability frameworks Quotations Envelope DIGTEC, Un logiciel Backup et on and new technology point d'accès wifi MR-BESSP-159784-GO-DIR / Connexion internet et accès WIFI, pour DREN et IDEN à Component 3: Strengthening Pending Nouakchott, et administration / management of the Post Direct Selection Direct 30,000.00 0.00 Implementati 2020-03-24 2020-03-29 2020-04-16 2020-04-19 du SIGE, et Installation de la education sector on connexion aux DREN et IDEN et formation. Component 3: Strengthening Pending MR-BESSP-175882-GO-RFQ Request for Single Stage - One IDA / V3120 management of the Post Limited 13,514.00 0.00 Implementati 2020-06-17 2020-07-13 2020-08-12 / Location de voitures Quotations Envelope education sector on MR-BESSP-175893-GO-RFQ Component 3: Strengthening Pending / Duplication des items de Request for Single Stage - One IDA / V3120 management of the Post Limited 33,713.00 0.00 Implementati 2020-06-13 2020-06-30 2020-07-30 l'évaluation des enseignants Quotations Envelope education sector on du fondamental. MR-BESSP-175899-GO-RFQ Component 3: Strengthening Pending / Matériel de passation des Request for Single Stage - One IDA / V3120 management of the Post Limited 10,034.00 0.00 Implementati 2020-06-20 2020-07-11 2020-07-26 épreuves de l'évaluation des Quotations Envelope education sector on enseignants du fondamental MR-BESSP-204844-GO-RFB / Component 3: Strengthening Pending Single Stage - One Acquisition de 18 véhicules IDA / V3120 management of the Post Request for Bids Open - National 814,547.00 0.00 Implementati 2020-12-05 2021-02-17 2021-08-16 Envelope pour 6 régions education sector on MR-BESSP-205324-GO-RFB / Acquisition de tablettes au Component 1: Transforming Pending profit de 4000 responsables teacher management using Single Stage - One IDA / V3120 Post Request for Bids Open - National 427,000.00 0.00 Implementati 2020-12-07 2020-12-12 2021-01-11 2021-01-26 2021-02-19 2021-02-25 de l'Enseignement accountability frameworks Envelope on Fondamental and new technology (Opérationnalisation du SIGE) MR-BESSP-205597-GO-RFQ / Location de véhicules pour Component 3: Strengthening Pending Request for Single Stage - One l'évaluation des acquis des IDA / V3120 management of the Post Limited 20,826.00 0.00 Implementati 2020-11-29 2020-12-29 2020-12-30 Quotations Envelope élèves de la 1ère AF et 1ère education sector on AS par la CNE MR-BESSP-205598-GO-RFQ / Fournitures et duplicata des Component 3: Strengthening Under Request for Single Stage - One instruments pour l'évaluation IDA / V3120 management of the Post Limited 9,000.00 0.00 Implementati 2020-11-29 2020-12-10 2020-12-12 Quotations Envelope des acquis des élèves de 1ère education sector on AF et 1ère AS par la CNE Page 1 MR-BESSP-222847-GO-RFB / Acquisition de tables bancs au Component 2: Improving Pending profit des wilayas du Hodh Single Stage - One IDA / V3120 education service delivery in Post Request for Bids Open - National 641,026.00 0.00 Implementati 2021-03-15 2021-03-20 2021-05-04 2021-05-19 2021-06-13 2021-12-10 Charghi, Hodh El Gharbi, Envelope selected regions on Assaba, Gorgol, Guidimaha et Nouakchott- SUD MR-BESSP-223592-GO-RFB / Component 2: Improving Pending Single Stage - One Acquisition des kits pour filles IDA / V3120 education service delivery in Post Request for Bids Open - National 571,500.00 0.00 Implementati 2021-03-25 2021-03-30 2021-04-29 2021-05-20 2021-06-09 2021-08-08 Envelope et enseignants selected regions on MR-BESSP-229837-GO-RFQ Component 1: Transforming / Acquisition de matériels Pending teacher management using Request for Single Stage - One informatique au profit de la IDA / D7360 Post Limited 53,000.00 0.00 Implementati 2021-04-27 2021-05-27 2021-06-11 accountability frameworks Quotations Envelope Cellule inspecteurs, CNE et on and new technology unité de gestion du projet MR-BESSP-229838-GO-RFQ Component 1: Transforming Pending / Acquisition de 240 tables et teacher management using Request for Single Stage - One IDA / D7360 Post Limited 17,000.00 0.00 Implementati 2021-05-03 2021-06-13 2021-06-28 chaises individuelles pour accountability frameworks Quotations Envelope on l’ENS and new technology MR-BESSP-234175-GO-RFB / Component 1: Transforming Acquisition de matériels Pending teacher management using Single Stage - One informatiques pour les ENI IDA / D7360 Post Request for Bids Open - National 480,000.00 0.00 Implementati 2021-05-31 2021-06-05 2021-07-05 2021-07-25 2021-08-29 2021-12-27 accountability frameworks Envelope dans le cadre de contrat de on and new technology performance MR-BESSP-234176-GO-RFB / Component 1: Transforming Acquisition des mobiliers Pending teacher management using Single Stage - One pour les ENI (tables bureaux, IDA / D7360 Post Request for Bids Open - National 200,000.00 0.00 Implementati 2021-05-31 2021-06-05 2021-06-08 2021-06-10 2021-07-15 2021-11-12 accountability frameworks Envelope climatiseurs…) dans le cadre on and new technology de contrat de performance ; MR-BESSP-234178-GO-RFQ Component 3: Strengthening Pending / Acquisitions d’équipements Request for Single Stage - One IDA / D7360 management of the Post Open - National 45,000.00 0.00 Implementati 2021-05-25 2021-07-09 2021-07-19 bureautiques pour l’unité de Quotations Envelope education sector on Projet PASEB 2 MR-BESSP-159785-GO-RFB / Component 1: Transforming Pending Equipement SIGE pour teacher management using Single Stage - One IDA / D7360 Post Request for Bids Open - National 600,000.00 0.00 Implementati 2021-07-01 2021-07-03 2021-08-02 2021-08-17 2021-09-06 2021-10-06 Administration centrale , accountability frameworks Envelope on DRENs et IDENs à Nouakchott. and new technology NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-BESSP-159797-NC-RFP / Component 3: Strengthening Quality And Cost- Pending Formulation du plan sectoriel / management of the Post Open - International 600,000.00 0.00 2020-04-20 2020-05-11 2020-06-24 2020-07-22 2020-08-21 2020-09-25 2020-10-30 2021-10-30 Based Selection Implementation et réformes éducatives education sector MR-BESSP-166467-CS-CQS / Recrutement d'un cabinet Component 3: Strengthening Consultant pour un appui au Ministère de Pending IDA / V3120 management of the Post Qualification Open - National 166,320.00 0.00 2020-04-06 2020-04-21 2020-05-20 2020-06-19 2020-07-24 2020-10-22 l'Enseignement Fondamental Implementation education sector Selection et de la réforme du Secteur de l'éducation Nationale zone 2 MR-BESSP-166468-CS-CQS / Recrutement d'un cabinet Component 3: Strengthening Consultant pour un appui au Ministère de Pending IDA / V3120 management of the Post Qualification Open - National 166,320.00 0.00 2020-04-13 2020-04-28 2020-05-27 2020-06-26 2020-07-31 2020-10-29 l'Enseignement Fondamental Implementation education sector Selection et de la réforme du Secteur de l'éducation Nationale zone 3 MR-BESSP-175876-CS-CQS / Component 3: Strengthening Consultant Under Recrutement d'un expert IDA / V3120 management of the Post Qualification Open - International 55,140.00 0.00 2020-06-10 2020-06-25 2020-07-12 2020-07-16 2020-07-23 2021-07-23 Implementation économiste/planificateur education sector Selection MR-BESSP-166466-CS-CQS / Recrutement d'un cabinet Component 3: Strengthening Consultant pour un appui au Ministère de Pending IDA / V3120 management of the Post Qualification Open - National 166,320.00 0.00 2020-03-30 2020-04-14 2020-05-13 2020-06-12 2020-07-17 2020-08-31 l'Enseignement Fondamental Implementation education sector Selection et de la réforme du Secteur de l'éducation Nationale zone 1 MR-BESSP-208483-CS-QCBS Component 1: Transforming / Renforcement des teacher management using Quality And Cost- Under compétences pédagogiques IDA / V3120 Post Open - National 210,000.00 0.00 2021-05-24 2021-01-18 2021-06-07 2021-06-15 2021-06-22 2021-06-24 2021-07-01 2021-07-06 2031-06-14 accountability frameworks Based Selection Implementation des formateurs (Assistance et and new technology formation) MR-BESSP-208742-CS-QCBS / Elaboration des Plans de Component 2: Improving Quality And Cost- Développement régionaux IDA / V3120 education service delivery in Post Open - National 297,600.00 0.00 Canceled 2020-12-16 2021-01-14 2020-12-23 2021-01-06 2021-01-14 2021-01-16 2021-01-26 2021-02-02 2021-03-19 Based Selection pour les 6 région selected regions d'intervention du Projet MR-BESSP-205407-CS-CQS / Component 2: Improving Consultant Elaboration d'un manuel de IDA / V3120 education service delivery in Post Qualification Open - National 58,000.00 0.00 Canceled 2020-12-01 2020-12-22 2021-02-04 2021-03-06 2021-04-10 2021-06-09 procédures pour les COGES et selected regions Selection les subventions aux écoles MR-BESSP-213513-CS-CQS / Component 3: Strengthening Least Cost Under Recrutement d'un auditeur IDA / V3120 management of the Post Open - National 30,000.00 0.00 2021-02-10 2021-01-25 2021-02-25 2021-03-17 2021-03-22 2021-03-27 2021-03-31 2021-04-12 2026-04-11 Selection Implementation externe du Projet PASEB II education sector Page 2 MR-BESSP-229821-CS-CQS / Recrutement d’une institution Component 1: Transforming Consultant universitaire pour l’appui à teacher management using Under IDA / D7360 Post Qualification Open - International 250,000.00 0.00 2021-04-30 2021-04-29 2021-05-21 2021-06-16 2021-07-04 2021-08-03 2021-09-07 2021-11-19 l’ENS dans la mise en accountability frameworks Implementation Selection place d'une formation des and new technology formateurs des INI MR-BESSP-229827-CS-QCBS / Recrutement d’un bureau de Component 2: Improving suivi pour les travaux de Quality And Cost- Under IDA / D7360 education service delivery in Post Open - National 6,800.00 0.00 2021-05-15 2021-05-27 2021-06-05 2021-07-19 2021-08-16 2021-09-15 2021-10-20 2021-11-24 2022-03-24 construction de 10 salles de Based Selection Implementation selected regions classe dans la wilaya de Nktt- Sud MR-BESSP-229832-CS-QCBS / Recrutement d’un bureau de Component 2: Improving suivi pour les travaux de Quality And Cost- Under IDA / D7360 education service delivery in Post Open - National 40,000.00 0.00 2021-05-14 2021-05-27 2021-06-04 2021-07-18 2021-08-15 2021-09-14 2021-10-19 2021-11-23 2022-03-23 construction de 56 salles de Based Selection Implementation selected regions classe dans la wilaya du Hodh Echarghi MR-BESSP-229833-CS-QCBS / Recrutement d’un bureau de Component 2: Improving suivi pour les travaux de Quality And Cost- Under IDA / D7360 education service delivery in Post Open - National 40,000.00 0.00 2021-05-14 2021-05-27 2021-06-04 2021-07-18 2021-08-15 2021-09-14 2021-10-19 2021-11-23 2022-03-23 construction de 54 salles de Based Selection Implementation selected regions classe dans la wilaya du Hodh El Gharbi MR-BESSP-229834-CS-QCBS / Recrutement d’un bureau de Component 2: Improving suivi pour les travaux de Quality And Cost- Under IDA / D7360 education service delivery in Post Open - National 34,000.00 0.00 2021-05-14 2021-05-27 2021-06-04 2021-07-18 2021-08-15 2021-09-14 2021-10-19 2021-11-23 2022-11-23 construction de 42 salles de Based Selection Implementation selected regions classe dans la wilaya de l’Assaba MR-BESSP-229835-CS-QCBS / Recrutement d’un bureau de Component 2: Improving suivi pour les travaux de Quality And Cost- Under IDA / D7360 education service delivery in Post Open - National 37,000.00 0.00 2021-05-14 2021-05-27 2021-06-04 2021-07-18 2021-08-15 2021-09-14 2021-10-19 2021-11-23 2022-03-23 construction 50 salle des Based Selection Implementation selected regions classe dans la wilaya du Gorgol MR-BESSP-229879-CS-QCBS / Recrutement d’un bureau de Component 2: Improving suivi pour les travaux de Quality And Cost- Under IDA / D7360 education service delivery in Post Open - National 30,000.00 0.00 2021-05-14 2021-05-27 2021-06-04 2021-07-18 2021-08-15 2021-09-14 2021-10-19 2021-11-23 2022-03-23 construction 40 salles de Based Selection Implementation selected regions classe dans la wilaya du Guidimagha MR-BESSP-237807-CS-CQS / Elaboration des Plans de Component 2: Improving Consultant Pending Développement régionaux IDA / D7360 education service delivery in Post Qualification Open - National 297,600.00 0.00 2021-06-02 2021-06-23 2021-08-06 2021-09-05 2021-09-29 2021-11-13 Implementation pour les 5 régions selected regions Selection d'intervention du Projet INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-BESSP-159783-CS-INDV Component 1: Transforming Individual / Appui au processus de teacher management using Under / Post Consultant Limited 28,000.00 0.00 2020-03-09 2020-03-14 2020-04-04 2020-05-09 2020-11-05 restructuration des ENIS et de accountability frameworks Implementation Selection l'ENS and new technology MR-BESSP-159791-CS-INDV Component 3: Strengthening Individual Pending / Manuel de procédure du / management of the Post Consultant Limited 25,000.00 0.00 2020-02-24 2020-02-29 2020-03-21 2020-04-25 2020-10-22 Implementation Projet education sector Selection MR-BESSP-159793-CS-INDV / Finalisation études Component 2: Improving Individual Pending environnementales et sociales / education service delivery in Post Consultant Limited 27,000.00 0.00 2020-03-12 2020-03-17 2020-04-07 2020-05-12 2020-11-08 Implementation et Mécanisme de Gestion des selected regions Selection Plaintes (trois consultants) MR-BESSP-159795-CS-INDV Component 3: Strengthening Individual Pending / Manuel d'exécution du / management of the Post Consultant Limited 25,000.00 0.00 2020-02-29 2020-03-05 2020-03-26 2020-04-30 2020-10-27 Implementation projet education sector Selection Component 1: Transforming MR-BESSP-160153-CS-INDV Individual teacher management using Pending / Appui à la restructuration / Post Consultant Open 25,000.00 0.00 2020-03-09 2020-04-27 2020-05-18 2020-06-22 2020-12-19 accountability frameworks Implementation des ENIs et ENS II Selection and new technology MR-BESSP-159786-CS-INDV Component 2: Improving Individual / Appui à l'élaboration du Pending / education service delivery in Post Consultant Limited 25,000.00 0.00 2020-04-13 2020-04-18 2020-05-09 2020-06-13 2020-12-10 nouveau modèle des cartes Implementation selected regions Selection scolaires (central et régional) MR-BESSP-175878-CS-CQS / Component 3: Strengthening Individual Pending recrutement d'un expert en IDA / V3120 management of the Post Consultant Open 55,140.00 0.00 2020-06-08 2020-07-07 2020-07-14 2020-07-26 2021-01-22 Implementation Education/Formation education sector Selection MR-BESSP-205334-CS-INDV Component 2: Improving Individual / Manuel de procédures pour Pending IDA / V3120 education service delivery in Post Consultant Open 18,000.00 0.00 2020-12-02 2020-12-28 2021-01-02 2021-01-10 2021-02-09 les plans de développement Implementation selected regions Selection régionnaux MR-BESSP-159788-CS-INDV Component 2: Improving Individual / Elaboration d'un manuel de / education service delivery in Post Consultant Limited 50,000.00 0.00 Canceled 2020-02-25 2020-03-01 2020-03-22 2020-04-26 2020-10-23 procédures pour COGES et selected regions Selection subventions aux écoles MR-BESSP-205542-CS-INDV / Accompagnement pour un Component 1: Transforming Individual appui à la conception , la mise teacher management using Under IDA / V3120 Post Consultant Open 86,000.00 0.00 2020-12-14 2021-01-18 2021-02-01 2021-02-22 2021-03-29 2025-03-28 en œuvre et au suivi des accountability frameworks Implementation Selection Projets d'Etablissement des and new technology ENI. Page 3 MR-BESSP-205516-CS-INDV Component 3: Strengthening Under / Recrutement Coordinateur IDA / V3120 management of the Post Direct Selection Direct 192,000.00 0.00 2020-11-19 2021-01-18 2020-11-29 2021-02-02 2026-02-01 Implementation Technique du Projet PASEB II education sector MR-BESSP-205408-CS-INDV Component 3: Strengthening / Recrutement Directeurs des Under IDA / V3120 management of the Post Direct Selection Direct 180,000.00 0.00 2020-11-19 2021-01-18 2020-11-29 2021-02-02 2026-02-01 travaux et superviseurs des Implementation education sector Cellules mobiles MR-BESSP-205535-CS-INDV Component 3: Strengthening Under / Recrutement Responsable IDA / V3120 management of the Post Direct Selection Direct 162,000.00 0.00 2020-11-19 2021-01-18 2020-11-29 2021-02-02 2026-02-01 Implementation Administratif et Financier education sector MR-BESSP-205540-CS-INDV Component 3: Strengthening Under / Recrutement Responsable IDA / V3120 management of the Post Direct Selection Direct 162,000.00 0.00 2020-11-19 2021-01-18 2020-11-29 2021-02-02 2026-02-01 Implementation Suivi Evaluation education sector MR-BESSP-205528-CS-INDV Component 3: Strengthening Under / Recrutement Spécialiste IDA / V3120 management of the Post Direct Selection Direct 162,000.00 0.00 2020-11-19 2021-01-18 2020-11-29 2021-02-02 2026-02-01 Implementation Passation des Marchés education sector Component 1: Transforming MR-BESSP-206727-CS-CDS / teacher management using Pending Appui pour le développement IDA / V3120 Post Direct Selection Direct 200,000.00 0.00 2020-12-15 2020-12-25 2021-01-03 2022-01-03 accountability frameworks Implementation et la mise e place du SIGE and new technology Component 1: Transforming MR-BESSP-208744-CS-INDV Individual teacher management using Under / Chef Composante 1 du IDA / V3120 Post Consultant Open 180,000.00 0.00 2020-12-15 2021-01-19 2021-02-02 2021-02-23 2021-03-30 2026-03-29 accountability frameworks Implementation projet PASEB II Selection and new technology MR-BESSP-205519-CS-INDV Component 3: Strengthening / Recrutement Chef IDA / V3120 management of the Post Direct Selection Direct 180,000.00 0.00 Canceled 2020-11-19 2020-11-29 2021-02-02 2026-02-01 Composante 1 du PASEB II education sector MR-BESSP-175841-CS-QCBS Component 3: Strengthening Individual / Recrutement d'un Expert en IDA / V3120 management of the Post Consultant Open 55,140.00 0.00 Canceled 2020-06-09 2020-07-08 2020-07-13 2020-08-03 2021-01-30 suivi-évaluation education sector Selection MR-BESSP-213551-CS-INDV / Recrutement d'un consultant Component 2: Improving Individual individuel pour l’élaboration Under IDA / V3120 education service delivery in Post Consultant Open 27,000.00 0.00 2021-01-25 2021-01-14 2021-02-28 2021-03-10 2021-03-17 2021-05-16 d’un manuel de procédure Implementation selected regions Selection pour les COGES et les subventions aux écoles MR-BESSP-213533-CS-INDV Component 3: Strengthening Individual / Renforcement des capacités IDA / V3120 management of the Post Consultant Open 36,000.00 36,029.89 Signed 2021-01-27 2021-01-18 2021-03-07 2021-05-06 2021-03-17 2021-05-18 2021-03-27 2021-06-07 2022-03-27 de la Cellule Nationale education sector Selection d'Evaluation MR-BESSP-205522-CS-INDV Component 3: Strengthening Under / Recrutement Chef IDA / V3120 management of the Prior Direct Selection Direct 180,000.00 0.00 2020-11-19 2021-02-17 2020-11-29 2021-02-02 2026-02-01 Implementation Composante 2 du PASEB II education sector MR-BESSP-213537-CS-CQS / Component 3: Strengthening Individual Under Spécialiste en Passation des IDA / V3120 management of the Post Consultant Open 162,000.00 0.00 2021-01-14 2021-01-19 2021-02-02 2021-02-03 2021-02-15 2021-08-14 Implementation Marchés education sector Selection Component 1: Transforming MR-BESSP-208741-CS-CDS / teacher management using Pending Appui au développement du IDA / V3120 Post Direct Selection Direct 1,600,000.00 0.00 2020-12-15 2021-01-04 2021-01-17 2026-01-16 accountability frameworks Implementation SIGE and new technology MR-BESSP-213511-CS-CQS / Component 3: Strengthening Individual Under recrutement d'un auditeur IDA / V3120 management of the Post Consultant Open 27,600.00 0.00 2021-01-14 2021-01-25 2021-03-04 2021-03-14 2021-03-28 2026-03-27 Implementation interne education sector Selection MR-BESSP-213509-CS-CDS / Component 3: Strengthening Under Expert en Education IDA / V3120 management of the Post Direct Selection Direct 144,000.00 0.00 2021-01-12 2021-02-03 2021-01-20 2021-02-08 2022-02-08 Implementation /Formation education sector MR-BESSP-213292-CS-CDS / Component 3: Strengthening Expert IDA / V3120 management of the Post Direct Selection Direct 60,000.00 0.00 Canceled 2021-01-11 2021-02-03 2021-01-21 2021-02-10 2022-02-10 Economiste/planificateur de education sector l’Education MR-BESSP-219785-CS-INDV / Responsable du suivi des Component 3: Strengthening Individual questions environnementales Under IDA / V3120 management of the Post Consultant Open 32,400.00 0.00 2021-02-15 2021-02-24 2021-03-09 2021-03-16 2021-03-22 2022-03-22 et sociales dans l’exécution Implementation education sector Selection des infrastructures du Projet PASEBII MR-BESSP-219970-CS-INDV Component 4: Contingent Individual Pending / Recrutement spécialiste IDA / V3120 Emergency Response Post Consultant Open 162,000.00 0.00 2021-02-16 2021-03-22 2021-04-01 2021-04-11 2026-04-10 Implementation Passation des Marchés 2 Component Selection MR-BESSP-223600-CS-INDV Component 2: Improving Individual Under / Spécialiste de Passation des IDA / V3120 education service delivery in Post Consultant Limited 162,000.00 0.00 2021-03-14 2021-03-16 2021-03-19 2021-04-09 2021-05-14 2021-11-10 Implementation Marchés selected regions Selection MR-BESSP-222850-CS-INDV Component 3: Strengthening Under / Recrutement d'une IDA / V3120 management of the Post Direct Selection Direct 16,939.00 0.00 2021-04-01 2021-04-30 2021-04-11 2021-05-06 2022-05-01 Implementation comptable education sector MR-BESSP-229836-CS-INDV / Recrutement d’un Consultant Individuel pour Component 2: Improving Individual Under l’élaboration d’un manuel de IDA / D7360 education service delivery in Post Consultant Limited 33,000.00 0.00 2021-04-30 2021-06-02 2021-05-05 2021-05-20 2021-06-14 2021-07-29 Implementation procédures pour les plans de selected regions Selection développement Régionaux de l’éducation MR-BESSP-229880-CS-INDV / Recrutement d’un Expert Component 3: Strengthening Individual Économiste/planificateur de IDA / D7360 management of the Post Consultant Limited 40,120.00 40,175.57 Signed 2021-04-19 2021-04-26 2021-04-24 2021-04-22 2021-05-15 2021-05-17 2021-06-13 2021-06-01 2021-10-09 l’Education au profit du education sector Selection Ministère de l’Education Page 4 MR-BESSP-234173-CS-INDV / Recrutement d’un Component 1: Transforming consultant individuel pour Individual teacher management using Pending l’élaboration des réseaux IDA / D7360 Post Consultant Open 40,000.00 0.00 2021-05-20 2021-07-08 2021-07-29 2021-09-02 2021-09-06 accountability frameworks Implementation d’échange et de partage pour Selection and new technology la formation initiale et continue des enseignants MR-BESSP-240251-CS-INDV / Recrutement d'un consultant Component 1: Transforming Individual individuel pour l’élaboration teacher management using Pending IDA / D7360 Post Consultant Limited 33,000.00 0.00 2021-06-25 2021-06-30 2021-07-03 2021-07-18 2021-08-27 d'un plan de formation accountability frameworks Implementation Selection continue pour les enseignants and new technology du fondamental. Page 5 12 MONTHS PROCUREMENT PLAN Project information: Case Study on Integrated Delivery of Selected Non-Communicable Diseases in Kenya (P164301) Project Implementation agency: Moi Teaching and Referral Hospital Date of the Procurement Plan: August 2018 Period covered by this Procurement Plan: One year Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: Paragraph 5.3 of the Procurement Regulations will not apply. When approaching the national market, the country’s own procurement procedures shall not be used due to restrictions on eligibility of otherwise eligible firms to participate in NCB. The Regulations will apply. However, the Borrower may use its own procurement arrangements as set forth in the Public Procurement and Disposal Act, 2003 Request for Quotation such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods : Applicable for those contracts identified in the Procurement Plan tables Works: applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information:- (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the IWMDP ): Thresholds*, Procurement Methods, and Prior Review Contract (C) Expenditure Value Procurement Contracts Subject to No Category Threshold* Method Prior Review /[eq. US$] [eq. USD] All contracts at or above USD 10 million are Open Competition subject to international advertising and the International Market use of the Bank’s SPDs (or other C ≥ 10,000,000 Approach and Direct documents agreed with the Bank), as well Contracting as the first contract under Open Competition 1 Works Open Competition 200,000 < C < National Market None except if it is the first contract under 10,000,000 Approach Open Competition. C ≤ 200,000 RfQ None All contracts at or above USD 2 million are Open Competition subject to international advertising and the Goods, IT and International Market use of the Bank’s SPDs (or other 2 non-consulting C ≥ 2,000,000 Approach and Direct documents agreed with the Bank), as well services as the first contract under Open Contracting Competition. Contract (C) Expenditure Value Procurement Contracts Subject to No Category Threshold* Method Prior Review /[eq. US$] [eq. USD] Open Competition : National Market None except if it is the first contract under 100,000 < C < Approach Open Competition. 2,000,000 C ≤ 100,000 RfQ None All contracts at or above USD 300,000 are for subject to international advertising and the C < 300,000 Consulting Services use of the Bank’s SPDs (or other selection of documents agreed with the Bank). 3 consultant firms All contracts at or above USD 300,000 are For Engineering and subject to international advertising and the C ≤ 300,000 Construction Supervision use of the Bank’s SPDs (or other documents agreed with the Bank). Selection of ≥ 300,000 ≥ 300,000 4 Individual All Approaches consultants Training, Workshops, Based on approved This line activity is not subject to 5 Study Tours All Values Annual Work Plan & procurement Review. Budgets (AWPB) by TTL * All contracts not subject to prior review will be post-reviewed. ** Short lists of consultants for services estimated to cost less US$300,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. However, if foreign firms have expressed interest, they will not be excluded from consideration. Prior review Thresholds High Substantial Procurement Type Risk Risk Works 5.0 10.0 Goods, It & Non-Consulting 1.5 2.0 Services Consultants (Firms) 0.5 1.0 Individual Consultants 0.2 0.3 Prequalification. Not expected for any works or goods packages in the procurement plan. Proposed Procedures for CDD Components: Applicable Reference to (if any) Project Operational/Procurement Manual: the IWMDP team will prepare a Procurement manuals, which will also be part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Kenya : Case Study on Integrated Delivery of Selected Non-Communicable Diseases in Kenya PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2018-08-24 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164301 GPN Date: Project Name: Case Study on Integrated Delivery of Selected Non-Communicable Diseases in Kenya Loan / Credit No: TF / A5636 Moi Teaching and Referral Hospital Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-MTRH-196211-CW-RFQ / Pending RENOVATION OF PHARMACY Request for Single Stage - One 2021-05- TF / A5636 Post Open - National 2,200.00 0.00 Implementat 2020-10-03 2020-11-28 SPACES FOR NAMBALE SUB Quotations Envelope 27 ion COUNTY HOSPITAL GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MTRH-68796-GO-RFQ / Pending Request for Single Stage - One Purchase of 2900 *50's TF / A5636 Post Limited 79,750.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 Quotations Envelope glucose strips on KE-MTRH-68800-GO-RFQ / Pending Request for Single Stage - One Purchase of 192 manual adult TF / A5636 Post Limited 28,800.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 Quotations Envelope weight meters on KE-MTRH-68842-GO-RFQ / Pending Procurement of assorted IT Request for Single Stage - One TF / A5636 Post Limited 7,700.00 0.00 Implementati 2018-09-01 2018-10-27 2019-04-25 equipment (6 recorders and 9 Quotations Envelope on Laptops) KE-MTRH-69303-GO-RFQ / Pending Purchase of 2000 tests of urea Request for Single Stage - One TF / A5636 Post Limited 5,644.00 0.00 Implementati 2018-09-01 2018-10-27 2019-04-25 and 400 Tests of creatinine Quotations Envelope on reagents Pending KE-MTRH-69552-GO-RFQ / Request for Single Stage - One TF / A5636 Post Limited 48,147.00 0.00 Implementati 2018-09-01 2018-10-27 2019-04-25 Purchase of assorted drugs Quotations Envelope on KE-MTRH-69652-GO-RFQ / Pending Request for Single Stage - One Purchase of 18,000* 10 Tests TF / A5636 Post Limited 54,000.00 0.00 Implementati 2018-08-25 2018-10-20 2019-04-18 Quotations Envelope of HBA1c on KE-MTRH-73508-GO-RFQ / Purchase of 73 no. manual Pending Request for Single Stage - One blood pressure machines and TF / A5636 Post Limited 19,000.00 0.00 Implementati 2018-08-25 2018-10-20 2019-04-18 Quotations Envelope 187 no. automatic blood on pressure machines KE-MTRH-74086-GO-RFQ / Purchase of assorted pelvic examination supplies (40 Pending metallic speculums,1800 Request for Single Stage - One TF / A5636 Post Limited 7,650.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 disposable speculums,20 pcs Quotations Envelope on of macintosh, 1000 pkts clean gloves, 300 pkts sanitary pads and 10 patient screens) KE-MTRH-74098-GO-RFQ / Pending Request for Single Stage - One Purchase of assorted patient TF / A5636 Post Limited 2,492.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 Quotations Envelope documentation supplies on KE-MTRH-74104-GO-RFQ / Pending Procurement of printed Request for Single Stage - One TF / A5636 Post Limited 14,460.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 campaign materials (241 no. Quotations Envelope on Flip charts) KE-MTRH-74108-GO-RFQ / Purchase of assorted office Pending stationery (30 reams of Request for Single Stage - One TF / A5636 Post Limited 990.00 0.00 Implementati 2018-09-05 2018-10-31 2019-04-29 printing papers, 5 extension Quotations Envelope on cables and 10 pieces of printer toners) KE-MTRH-69647-GO-RFQ / Purchase of assorted biopsy supplies-100 plastic bottles,200 biopsy needles Pending Request for Single Stage - One G.14,5 formaldehyde*PCs,5 l TF / A5636 Post Limited 48,905.00 0.00 Implementati 2018-10-05 2018-11-30 2019-05-29 Quotations Envelope vinegar*PCs,180*500 g on buffers ,2000*50's of fiber tipped sticks,1000 surgical gloves among others KE-MTRH-68803-GO-RFQ / Purchase of education and screening supplies-12 tables,24 chairs,14884 batteries,50tape measures, Pending 110*40g cotton wool, Request for Single Stage - One TF / A5636 Post Limited 49,657.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 40,000prickers,66 tins Quotations Envelope on spirit,15 bags,61umbrellas,350T- shirts,61 Lab coats,1872 posters/fliers,55400 patient cards100 registers & others Page 1 KE-MTRH-69556-GO-RFQ / Procurement of assorted training and conference materials Pending Request for Single Stage - One 800 pcs A5 notebooks,800pc TF / A5636 Post Limited 1,434.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 Quotations Envelope clear plastic bags, 40pkts biro on pens,4 doz felt pens,100 pcs manila papers A1, 100 pcs flip charts KE-MTRH-69637-GO-RFQ / Purchase of assorted VIA supplies-10 bales tissues ,70 buckets,960 pcs normal saline,40 hand towel,60 pcs Pending Request for Single Stage - One soap,200 garbage collection TF / A5636 Post Limited 6,315.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 Quotations Envelope bags,20*5l vinegar,100*400g on cotton wool,50 pc KY jelly,100*50 pregnancy test kits,20 forceps,100*20l distilled water etc KE-MTRH-204575-GO-RFQ / Pending Purchase of HbA1C Cartridges TF / A5636 Post Direct Selection Direct 9,600.00 0.00 Implementati 2020-11-13 2020-11-18 2020-12-23 2021-06-21 for controlling level of sugars on on diabetic patients KE-MTRH-204662-GO-RFQ / Pending Request for Single Stage - One Purchase of nitrous gas for TF / A5636 Post Open - National 4,320.00 0.00 Implementati 2020-11-18 2021-01-13 2021-07-12 Quotations Envelope cryotherapy-16563L on KE-MTRH-204486-GO-RFQ / Pending Purchase of stationery to be Request for Single Stage - One TF / A5636 Post Open - National 1,737.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 used to facilitate the Quotations Envelope on operation of the project KE-MTRH-204571-GO-RFQ / Pending Request for Single Stage - One Purchase of car rims for TF / A5636 Post Open - National 700.00 0.00 Implementati 2020-11-23 2021-01-18 2021-07-17 Quotations Envelope project vehicle . on KE-MTRH-204577-GO-RFQ / Pending Purchase of 50 pairs of Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 240.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Batteries AAA energizer to be Quotations Envelope on used on thermo guns. KE-MTRH-204665-GO-RFQ / Purchase of medical Pending Request for Single Stage - One equipment: TF / A5636 Delivery of NCD Services Post Limited 8,100.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Quotations Envelope 1.Creatinine kit-60 pieces on 2.Electrolyte pack-15 pieces KE-MTRH-204667-GO-DIR / Purchase of the following Pending Request for Single Stage - One items: 1.Tissue -20 Bales (40 TF / A5636 Delivery of NCD Services Post Limited 1,679.80 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 Quotations Envelope tissues per bale) 2. Hand on sanitizers 500 ml-300 Pieces KE-MTRH-209087-GO-RFQ / Pending Request for Single Stage - One Procurement of assorted TF / A5636 Delivery of NCD Services Post Limited 27,902.74 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 Quotations Envelope drugs for hypertension on KE-MTRH-209073-GO-RFQ / Pending Request for Single Stage - One Purchase of crea kit Chemistry TF / A5636 Delivery of NCD Services Post Limited 2,325.60 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 Quotations Envelope Analyzer -60 kits on Pending KE-MTRH-215567-GO-RFQ / Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 1,500.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 PURCHASE OF LAPTOP Quotations Envelope on KE-MTRH-215569-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF 1100 BOXES OF TF / A5636 Delivery of NCD Services Post Limited 15,400.00 0.00 Implementati 2021-02-06 2021-04-03 2021-09-30 Quotations Envelope CLEAN GLOVES on KE-MTRH-215566-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF 2 PIECES OF TF / A5636 Delivery of NCD Services Post Limited 240.00 0.00 Implementati 2021-02-06 2021-04-03 2021-09-30 Quotations Envelope WIRELESS ROUTERS on KE-MTRH-215559-GO-RFQ / Pending Request for Single Stage - One Purchase of two Ultrasound TF / A5636 Delivery of NCD Services Post Limited 54,000.00 0.00 Implementati 2021-02-06 2021-04-03 2021-09-30 Quotations Envelope Digital Machines on KE-MTRH-216040-GO-RFQ / Purchase of Assorted human drugs; Pending Request for Single Stage - One 1. Enalapril 5mg-1200 TF / A5636 Delivery of NCD Services Post Limited 1,677.00 0.00 Implementati 2021-02-06 2021-04-03 2021-09-30 Quotations Envelope packets on 2. Lisinopril 20mg-500 packets KE-MTRH-216047-GO-RFQ / Pending Request for Single Stage - One Purchase of two pieces of TF / A5636 Delivery of NCD Services Post Limited 80,000.00 0.00 Implementati 2021-02-09 2021-04-06 2021-10-03 Quotations Envelope Cryotherapy units on KE-MTRH-220069-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF 256 BOXES OF TF / A5636 Delivery of NCD Services Post Limited 4,352.00 0.00 Implementati 2021-02-27 2021-04-24 2021-10-21 Quotations Envelope GLOVES on KE-MTRH-220075-GO-RFQ / PURCHASE OF; Pending Request for Single Stage - One 1. PHOTOCOPY PAPERS-95 TF / A5636 Delivery of NCD Services Post Limited 830.00 0.00 Implementati 2021-02-27 2021-04-24 2021-10-21 Quotations Envelope BOXES on 2. TONERS-10 PIECES KE-MTRH-220533-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF LEEP TF / A5636 Delivery of NCD Services Post Limited 14,000.00 0.00 Implementati 2021-03-05 2021-04-30 2021-10-27 Quotations Envelope EQUIPMENT -QUANTITY 2 on KE-MTRH-221883-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF HBAIC TF / A5636 Delivery of NCD Services Post Limited 44,415.00 0.00 Implementati 2021-03-12 2021-05-07 2021-11-03 Quotations Envelope MACHINES-10 PIECES on Page 2 KE-MTRH-221888-GO-RFQ / PURCHASE OF; Pending 1.TENTS WITH GAZEBO 100 Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 6,072.00 0.00 Implementati 2021-03-12 2021-05-07 2021-11-03 SEATER- 3 PIECES Quotations Envelope on 2 . PLASTIC CHAIRS- 300 PIECES KE-MTRH-222511-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF LEEP TF / A5636 Delivery of NCD Services Post Limited 14,000.00 0.00 Implementati 2021-03-13 2021-05-08 2021-11-04 Quotations Envelope EQUIPMENT-2 PIECES on KE-MTRH-222515-GO-RFQ / PURCHASE OF; 1.STETHOSCOPE LITMAN-12 PIECES 2.METALLIC SPECULUMS Pending (SMALL)-50PIECES Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 3,963.20 0.00 Implementati 2021-03-13 2021-05-08 2021-11-04 3.METALLIC SPECULUMS Quotations Envelope on (MEDIUM)-300PIECES 4.METALLIC SPECULUMS(LARGE)-50PIECES 5. CERVICAL BIOPSY FORCEPS- 24 PIECES KE-MTRH-221891-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF INSULIN 70/30 TF / A5636 Delivery of NCD Services Post Limited 1,500.00 0.00 Implementati 2021-03-12 2021-05-07 2021-11-03 Quotations Envelope VIALS-QUANTITY 500 on KE-MTRH-231497-GO-RFQ / Pending Request for Single Stage - One PURCHASE OF ASSORTED TF / A5636 Delivery of NCD Services Post Limited 29,993.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 Quotations Envelope HUMAN DRUGS on KE-MTRH-231459-GO-RFQ / Pending PURCHASE OF ; Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 4,760.00 0.00 Implementati 2021-05-12 2021-05-24 2021-06-23 1. 1000 PIECES OF KY JELLY Quotations Envelope on 2. 3932 PIECES OF VINEGAR KE-MTRH-231461-GO-RFQ / PURCHASE OF; Pending 1. 400 PIECES OF COTTON Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 6,740.00 0.00 Implementati 2021-05-12 2021-05-24 2021-06-23 WOOL Quotations Envelope on 2. 6000 PIECES OF SANITARY TOWELS KE-MTRH-231443-GO-RFQ / PURCHASE OF; Pending 1. 200 PIECES OF METTALIC Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 10,500.00 0.00 Implementati 2021-05-12 2021-05-24 2021-06-23 SPECULUMS Quotations Envelope on 2. 1200 PIECES OF DISPOSABLE SPECULUMS KE-MTRH-231510-GO-DIR / Pending PURCHASE OF 14 PIECES OF TF / A5636 Delivery of NCD Services Post Direct Selection Direct 35,000.00 0.00 Implementati 2021-05-28 2021-05-29 2021-05-31 2021-06-30 BIOPSY GUNS on KE-MTRH-240615-GO-RFQ / Pending PURCHASE OF 13 PIECES OF Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 78,000.00 0.00 Implementati 2021-06-24 2021-07-10 2021-08-09 WISAP CERVICAL COLD Quotations Envelope on THERMOCOAGULATORS KE-MTRH-240731-GO-RFQ / Pending PURCHASE OF 10 PIECES OF Request for Single Stage - One TF / A5636 Delivery of NCD Services Post Limited 25,439.00 0.00 Implementati 2021-06-24 2021-07-04 2021-08-03 ELECTROCARDIOGRAPH Quotations Envelope on MACHINE WITH TROLLEY NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MTRH-68840-NC-RFQ / Procurement of radio Pending Request for Single Stage - One advertisement services once TF / A5636 Post Limited 1,000.00 0.00 Implementati 2018-09-01 2018-10-27 2019-04-25 Quotations Envelope every two months for year 1 in on the local radio stations CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MTRH-96604-CS-INDV / Procurement of costing consultant-Health Economics Specialist to achieve 4 obj.Quantify intervention Individual Under delivery cost sand budget TF / A5636 Post Consultant Limited 29,126.00 0.00 2019-01-30 2019-02-11 2019-03-18 2019-04-22 2019-10-19 Implementation required,develop data Selection collection tools to capture all relevant costs,quantify per capita costs for patients,publish articles Page 3 PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Central African Republic : Data for Decision Making PLAN General Information Country: Central African Republic Bank’s Approval Date of the Original Procurement Plan: 2018-02-07 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160717 GPN Date: Project Name: Data for Decision Making Loan / Credit No: IDA / D1710, TF / A5107 Data for Decision Making Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CF-PDNPD-113905-CW-RFQ Statistical recovery, / MP_Réhabilitation de rehabilitation, Request for Single Stage - One 2020-05- l'ICASEES: Recrutement d'une IDA / D1710 Post Limited 363,637.00 457,342.04 Signed 2019-09-20 2019-09-17 2019-11-15 2020-01-19 professionalization and Quotations Envelope 13 firme pour la mise en œuvre modernization of ICASEES des travaux GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-PDNPD-64157-GO-DIR / Statistical recovery, ACHAT D'UN SYSTEME rehabilitation, IDA / D1710 Prior Direct Selection Direct 24,710.00 21,415.54 Signed 2018-06-15 2018-06-29 2018-06-22 2018-08-01 2018-07-12 2018-08-10 2018-08-11 COMPTABLE + MAINTENANCE professionalization and d'UN AN + FORMATION. modernization of ICASEES CF-PDND-65249-GO-RFQ / Data collection, production Request for Single Stage - One Achat des mobiliers de bureau TF / A5107 Post Limited 3,780.00 3,368.38 Signed 2018-01-27 2018-01-24 2018-03-24 2018-02-15 2018-09-20 and dissemination Quotations Envelope du PDNPD CF-PDND-65236-GO-RFQ / Data collection, production Request for Single Stage - One Location de véhicule pour IDA / D1710 Post Limited 64,680.00 56,786.13 Signed 2018-03-08 2018-03-07 2018-04-04 2018-03-09 2018-10-01 and dissemination Quotations Envelope l'ENMC2 Statistical recovery, CF-PDND-65244-GO-RFQ / rehabilitation, Request for Single Stage - One Acquisition matériels TF / A5107 Post Limited 7,520.00 6,557.68 Signed 2018-05-23 2018-05-18 2018-07-18 2018-06-05 2019-01-14 professionalization and Quotations Envelope infotmatiques du PDNPD modernization of ICASEES Statistical recovery, CF-PDND-65259-GO-RFQ / rehabilitation, Request for Single Stage - One Installation de la connection TF / A5107 Post Limited 2,458.60 2,204.42 Signed 2018-01-29 2018-01-24 2018-03-26 2018-02-26 2018-09-22 professionalization and Quotations Envelope internet de l'ICASEES modernization of ICASEES CF-PDND-69037-GO-RFQ / Statistical recovery, Connexion internet. Extension rehabilitation, Request for Single Stage - One TF / A5107 Post Limited 43,219.30 23,855.63 Signed 2018-07-15 2018-07-16 2018-09-09 2018-08-17 2019-03-08 du réseau internet de professionalization and Quotations Envelope l'ICASEES. modernization of ICASEES CF-PDND-82965-GO-DIR / Statistical recovery, Moyens roulants- acquisition rehabilitation, IDA / D1710 Post Direct Selection Direct 100,000.00 83,090.88 Signed 2018-08-20 2018-09-14 2018-08-25 2018-09-14 2018-09-29 2018-09-27 2019-03-28 de véhicules 4 x 4 pour le professionalization and projet. modernization of ICASEES Statistical recovery, CF-PDND-84450-GO-RFQ / rehabilitation, Request for Single Stage - One Mobilier de bureau: Achats IDA / D1710 Post Limited 8,830.00 5,055.96 Signed 2018-12-15 2018-11-13 2019-02-09 2019-11-09 2019-08-08 professionalization and Quotations Envelope pour les bureaux de l'ICASEES modernization of ICASEES Statistical recovery, CF-PDND-84454-GO-RFQ / rehabilitation, Request for Single Stage - One Vidéoprojecteurs : Achat pour IDA / D1710 Post Limited 4,415.00 3,958.54 Signed 2018-11-20 2018-11-19 2019-01-15 2018-12-17 2019-07-14 professionalization and Quotations Envelope les services de l'ICASEES. modernization of ICASEES CF-PDND-79105-GO-RFQ / Statistical recovery, Fourniture et consommable rehabilitation, Request for Single Stage - One IDA / D1710 Post Limited 18,181.81 14,212.47 Signed 2018-12-05 2018-11-13 2019-01-30 2018-12-05 2019-07-29 informatique, achat pour professionalization and Quotations Envelope l'ICASEES et le PDNPD modernization of ICASEES CF-PDND-71614-GO-DIR / PICK-UP acquisition de deux'02) véhicules 4 x 4 Statistical recovery, double cabines pour servir de rehabilitation, liaison au niveau du projet et IDA / D1710 Prior Direct Selection Direct 90,910.00 0.00 Canceled 2018-08-24 2018-09-13 2018-08-29 2018-09-17 2018-10-03 2019-04-01 professionalization and faciliter les activités de modernization of ICASEES collecte des données sur le terrain par les agents de l'ICASEES. CF-PDND-84396-GO-RFQ / Statistical recovery, Scanners A0 et A5: Achat rehabilitation, Request for Single Stage - One TF / A5107 Post Limited 10,000.00 9,399.26 Signed 2018-12-22 2018-12-21 2019-02-16 2019-01-07 2019-08-15 pour la Direction des professionalization and Quotations Envelope statistiques démographique. modernization of ICASEES CF-PDNPD-94138-GO-RFQ / EHCVM : Acquisition des matériels informatiques de Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 37,909.00 35,406.07 Signed 2019-01-26 2019-01-21 2019-03-23 2019-02-05 2019-09-19 l'enquête (Ordinateur and dissemination Quotations Envelope portable, tablettes, power - bank, modem universel, carte sim. CF-PDNPD-94142-GO-RFQ / EHCVM: Achat des Gilets, casquettes , tee short et sac à Data collection, production Request for Single Stage - One dos pour la phase IDA / D1710 Post Limited 4,000.00 3,588.09 Signed 2019-01-27 2019-01-22 2019-03-24 2019-01-31 2019-09-20 and dissemination Quotations Envelope préparatoire(supervision et actualisation de la cartographie). Page 1 CF-PDNPD-94145-GO-RFQ / EHCVM: Achat des kits de formation et de collecte (Bloc- notes GF, stylo, marker, Data collection, production Request for Single Stage - One classeur, gomme, IDA / D1710 Post Limited 1,810.00 1,526.34 Signed 2019-01-27 2019-01-21 2019-03-24 2019-01-30 2019-09-20 and dissemination Quotations Envelope planchette(sous-main), Flip chart(commande groupée pour 4 étapes y compris UNS) pour la phase préparatoire. CF-PDND-84442-GO-RFQ / Statistical recovery, Imprimantes et photocopieurs rehabilitation, Request for Single Stage - One IDA / D1710 Post Limited 9,713.00 0.00 Canceled 2018-12-25 2019-02-19 2019-08-18 : Achats pour les bureaux de professionalization and Quotations Envelope l'ICASEES. modernization of ICASEES CF-PDNPD-111239-GO-RFQ / IHPC: contrat de location de Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 2,673.00 2,512.05 Signed 2019-04-28 2019-04-19 2019-06-23 2019-04-23 2019-12-20 trois véhicules pick-up 4 x4 and dissemination Quotations Envelope pour la mission de terrain. CF-PDNPD-113955-GO-RFQ / MP_Fourniture de bureau : Statistical recovery, Achat de rames de papier, rehabilitation, Request for Single Stage - One IDA / D1710 Post Limited 18,185.00 16,992.88 Signed 2019-06-04 2019-05-20 2019-07-30 2019-05-31 2020-01-26 cahiers, stylos, encres et professionalization and Quotations Envelope tambours pour photocopieurs modernization of ICASEES et imprimantes. CF-PDNPD-114923-GO-RFQ / RGPH_Achat de 18 Data collection, production Request for Single Stage - One ordinateurs de bureau + 18 IDA / D1710 Post Limited 30,000.00 35,315.88 Signed 2019-06-22 2019-06-26 2019-08-17 2019-06-27 2020-02-13 and dissemination Quotations Envelope Ecrans pour les travaux cartographiques de laboratoire CF-PDNPD-114918-GO-RFQ / RGPH_Achat de 23 bureaux + 23 chaises sur roulettes + Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 14,364.00 11,047.27 Signed 2019-08-06 2019-06-17 2019-10-01 2019-07-01 2020-03-29 1 table de réunion et 10 and dissemination Quotations Envelope chaises pour la salle de production cartographique CF-PDNPD-114983-GO-RFQ / RGPH_Achat d'un groupe Data collection, production Request for Single Stage - One électrogène pour la salle de IDA / D1710 Post Limited 27,273.00 29,551.90 Signed 2019-08-06 2019-06-26 2019-10-01 2019-07-08 2020-03-29 and dissemination Quotations Envelope production cartographique (50 KVA) CF-PDNPD-114922-GO-RFQ / RGPH_ Achat des Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 21,818.00 18,131.73 Signed 2019-08-06 2019-09-17 2019-10-01 2019-10-13 2020-03-29 imprimantes A1 et A3 + les and dissemination Quotations Envelope consommables CF-PDNPD-114992-GO-RFQ / RGPH_Tablettes + powerbank + cartes SD tablettes: acquisition de 120 Data collection, production Request for Single Stage - One tablettes android de 8 pouces IDA / D1710 Post Limited 85,364.00 74,494.46 Signed 2019-09-06 2019-09-16 2019-11-01 2019-10-13 2020-04-29 and dissemination Quotations Envelope avec coque de protection, 150 powerbank de 20.000 mAh et de 200 cartes SD pour la Cartographie CF-PDNPD-114921-GO-RFQ / RGPH_ Serveur de stockage Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 4,545.00 4,016.42 Signed 2019-09-04 2019-09-17 2019-10-30 2019-10-08 2020-04-27 de données pour les travaux and dissemination Quotations Envelope cartographiques de laboratoire CF-PDNPD-114924-GO-RFQ / RGPH_Onduleur : achat de 18 onduleurs APC 700VA ou Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 9,274.00 3,799.53 Signed 2019-06-22 2019-06-26 2019-08-17 2019-07-08 2020-02-13 équivalent capacité la salle de and dissemination Quotations Envelope production cartographique (8kVA) CF-PDNPD-114986-GO-RFQ / RGPH_ Achat de Petit matériel, Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 2,728.00 0.00 Canceled 2019-08-06 2019-10-01 2020-03-29 multiprise+cablâge+switch and dissemination Quotations Envelope pour les équipements de la salle cartographique CF-PDNPD-114985-GO-RFQ / RGPH_ Acquisition de deux Data collection, production Request for Single Stage - One Telephones_satellitaire pour IDA / D1710 Post Limited 35,000.00 31,848.24 Signed 2020-01-04 2020-07-08 2020-02-29 2020-07-08 2020-08-27 and dissemination Quotations Envelope les opérations de terrain - 2 unités CF-PDNPD-114997-GO-RFQ / RGPH_ Groupe Electrogène: Acquisition de 25 unités pour Data collection, production Request for Single Stage - One la recharge des tablettes sur IDA / D1710 Post Limited 11,592.00 18,500.33 Signed 2020-01-04 2019-11-09 2020-02-29 2020-01-17 2020-08-27 and dissemination Quotations Envelope le terrain (Groupe électogène ou panneau solaire) + petit matériel électrique (rallonges) CF-PDND-86482-GO-RFQ / ENMC2 : Impression des Data collection, production Request for Single Stage - One rapports de l'enquête IDA / D1710 Post Limited 5,000.00 3,262.07 Signed 2020-01-04 2020-07-09 2020-02-29 2020-07-09 2020-08-27 and dissemination Quotations Envelope Nationale sur les monographies Communales. CF-PDNPD-134578-GO-RFQ / RGPH_achats des matériels de terrain ( sacs à dos, Imperméables ,bottes, tee- Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 21,818.00 20,121.79 Signed 2019-12-05 2019-11-09 2020-01-30 2019-11-11 2020-07-28 shirt, gilet, moustiquaires, and dissemination Quotations Envelope lampes torches rechargeables, matelas, réchaud, bidon vide de 20 litres). CF-PDNPD-152981-GO-RFQ Statistical recovery, / RGPH- Sensibilisation rehabilitation, Request for Single Stage - One _Equipements de terrain: IDA / D1710 Post Limited 36,364.00 32,988.40 Signed 2020-02-05 2020-05-12 2020-04-01 2020-05-12 2020-09-28 professionalization and Quotations Envelope impression de 3000 tee-shirt modernization of ICASEES et de 1000 polos avec logo, Page 2 CF-PDNPD-153028-GO-RFQ Statistical recovery, / RGPH_ sensibilisation: rehabilitation, Request for Single Stage - One Acquisition de 30 banderoles, IDA / D1710 Post Limited 8,636.00 7,587.33 Signed 2020-02-05 2020-05-12 2020-04-01 2020-05-12 2020-09-28 professionalization and Quotations Envelope 5000 dépliants 30 Fanions 60 modernization of ICASEES logos CF-PDNPD-154488-GO-RFQ / Direction des Ressources:_ Achat de rames de papier, Statistical recovery, cahiers, stylos, encres et rehabilitation, Request for Single Stage - One IDA / D1710 Post Limited 18,182.00 17,325.51 Signed 2020-04-05 2020-05-12 2020-05-31 2020-05-12 2020-11-27 tambours pour photocopieurs professionalization and Quotations Envelope et imprimantes, services modernization of ICASEES d'imprimerie, maintenance des machines de l'ICASEES. CF-PDNPD-154842-GO-RFQ / EHCVM_ Collecte vague 1: Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 2,955.00 0.00 Canceled 2020-04-04 2020-05-30 2020-11-26 Acquisition de 25 groupe and dissemination Quotations Envelope électrogènes CF-PDNPD-154768-GO-RFQ / IPC_Acquistion de 35 Powerbank, 5 panneaux solaires de 300 Watt, 5 Statistical recovery, baterries de 200 HA, 5 rehabilitation, Request for Single Stage - One TF / A5107 Post Limited 13,364.00 3,064.36 Signed 2020-02-25 2020-03-24 2020-04-21 2020-03-24 2020-10-18 régulateurs de 200 wat; 5 professionalization and Quotations Envelope convertisssseurs et 5 modernization of ICASEES rallonges + 15 balances électronique et 30 paires de piles (CR2032) CF-PDNPD-154846-GO-RFQ / EHCVM_ Collecte vague 1: Acquisition de 100 gilets,100 Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 3,545.00 494.80 Signed 2020-03-05 2020-03-24 2020-04-30 2020-04-21 2020-10-27 polos imprimés avec and dissemination Quotations Envelope logos,100 lampes torches rechargeables CF-PDNPD-157528-GO-RFQ / Contrat cadre relatif a la location des véhicules 4 x 4 Data collection, production Request for Single Stage - One pour la mise en oeuvre des IDA / D1710 Post Limited 1,098,055.00 107.44 Signed 2020-02-20 2020-07-08 2020-04-16 2020-08-11 2020-10-13 and dissemination Quotations Envelope Enquêtes : EHCVM- Commerce Transfrontalier Non Enregistré- RGPH 04- CF-PDNPD-154758-GO-RFQ / IPC_Acquisition de 35 tablettes, 35 pochettes, 11 Statistical recovery, ordinateurs portables, 11 CD rehabilitation, Request for Single Stage - One office avec licence et TF / A5107 Post Limited 30,445.00 39,390.32 Signed 2020-02-25 2020-06-28 2020-04-21 2020-07-15 2020-10-18 professionalization and Quotations Envelope antivirus pour 11 postes, modernization of ICASEES Acquisition 15 balance électronique, 30 paires de piles (CR2032) CF-PDNPD-159491-GO-RFQ / EHCVM_ Achat de 60 Data collection, production Request for Single Stage - One tablettes et de 60 coques de IDA / D1710 Post Limited 36,000.00 31,506.35 Signed 2020-03-05 2020-02-21 2020-04-30 2020-03-20 2020-10-27 and dissemination Quotations Envelope protection en verre pour l'enquête principale. CF-PDNPD-188375-GO-RFQ / IPC_ Achat des licences du Statistical recovery, système d'exploitation pour rehabilitation, Request for Single Stage - One TF / A5107 Post Limited 2,347.00 2,117.14 Signed 2020-09-20 2020-08-20 2020-11-15 2020-08-27 2021-05-14 les ordinateurs acquis professionalization and Quotations Envelope préalablement pour les modernization of ICASEES activités de l'IPC. CF-PDNPD-154840-GO-RFQ Data collection, production Request for Single Stage - One / EHCVM_ Collecte vague: IDA / D1710 Post Limited 9,091.00 0.00 Canceled 2020-08-04 2020-09-29 2021-03-28 and dissemination Quotations Envelope Acquisition de 50 GPS CF-PDNPD-146550-GO-RFQ / EHCVM_ location de huit (08) véhicules pour 18 jours, Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 15,710.00 0.00 Canceled 2020-01-05 2020-03-01 2020-08-28 deux (02) véhicules de and dissemination Quotations Envelope supervision et six (06) véhicules de terrain. CF-PDND-84421-GO-RFQ / Statistical recovery, Ordinateurs et Onduleurs: rehabilitation, Request for Single Stage - One IDA / D1710 Post Limited 13,245.00 0.00 Canceled 2019-12-07 2020-02-01 2020-07-30 Achat pour les bureaux de professionalization and Quotations Envelope l'ICASEES. modernization of ICASEES CF-PDNPD-190782-GO-RFQ / Contrat cadre_ Procédure Data collection, production Request for Single Stage - One complémentaire en vue de IDA / D1710 Post Limited 549,028.00 165,057.20 Signed 2020-11-04 2020-09-22 2020-12-30 2020-10-14 2021-06-28 and dissemination Quotations Envelope porter le nombre des fournisseurs à quatre (04) CF-PDNPD-190796-GO-RFQ / EHCVM_ Acquisition de 29 Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 12,045.00 7,478.49 Signed 2020-11-05 2020-11-13 2020-12-31 2020-11-24 2021-06-29 groupes électrogènes pour les and dissemination Quotations Envelope activités de l'enquête. CF-PDNPD-188381-GO-RFQ / Direction des Ressources : Statistical recovery, Acquisition d'un VSAT + Frais rehabilitation, Request for Single Stage - One d'abonnement internet et de IDA / D1710 Post Limited 49,091.00 43,776.24 Signed 2020-10-05 2020-09-28 2020-11-30 2020-11-05 2021-05-29 professionalization and Quotations Envelope dix(12) ordinateurs portables modernization of ICASEES et deux (02) imprimantes en couleurs. CF-PDNPD-204970-GO-RFQ / ENA_ Achat des tablettes+ COQUE DE PROTECTION? Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 86,364.00 88,719.70 Signed 2021-01-04 2020-11-23 2021-03-01 2020-12-17 2021-08-28 powerbank et cartes SD pour and dissemination Quotations Envelope la mise en oeuvre de l'enquête Agricole en RCA. CF-PDNPD-204971-GO-RFQ / ENA_Achat des kits de Data collection, production Request for Single Stage - One voyage des agents IDA / D1710 Post Limited 10,182.00 17,749.25 Signed 2021-01-04 2020-12-04 2021-03-01 2020-12-21 2021-08-28 and dissemination Quotations Envelope enquêteurs dans le cadre de l'enquête Agricole en RCA Page 3 CF-PDNPD-204972-GO-RFQ / ENA_ Achat des groupes Data collection, production Request for Single Stage - One électrogènes et rallonges pour IDA / D1710 Post Limited 2,955.00 7,567.71 Signed 2021-01-04 2020-11-13 2021-03-01 2020-11-24 2021-08-28 and dissemination Quotations Envelope la mise en oeuvre de l'enquête Agricole en RCA. CF-PDNPD-220590-GO-RFQ / E-Bibliothèque et diffusion: Statistical recovery, Achat de matériels rehabilitation, Request for Single Stage - One IDA / D1710 Post Limited 15,454.00 14,829.94 Signed 2021-06-05 2021-03-23 2021-07-31 2021-04-13 2022-01-27 informatiques ( Ordinateurs et professionalization and Quotations Envelope Imprimantes spécifiques à modernization of ICASEES l’activité) CF-PDNPD-220639-GO-RFQ Statistical recovery, / Manuel de Contrôle qualité: Pending rehabilitation, Request for Service d’imprimerie pour la IDA / D1710 Post 9,100.00 0.00 Implementati 2021-05-05 2021-06-30 2021-12-27 professionalization and Quotations multiplication du manuel on modernization of ICASEES validé. CF-PDNPD-220646-GO-RFQ / Direction des Ressources : Achats des rames de papier, Statistical recovery, consommables informatiques rehabilitation, Request for Single Stage - One et autres fournitures de IDA / D1710 Post Limited 27,273.00 26,844.66 Signed 2021-05-05 2021-03-01 2021-06-30 2021-03-11 2021-12-27 professionalization and Quotations Envelope bureau pour le modernization of ICASEES fonctionnement courant des Directions et services de l'ICASEES. CF-PDNPD-220775-GO-RFQ Pending Data collection, production Request for Single Stage - One / RUE_ Achat de fourniture et IDA / D1710 Post Limited 3,636.00 0.00 Implementati 2021-08-05 2021-09-30 2022-03-29 and dissemination Quotations Envelope équipements on CF-PDNPD-220780-GO-RFQ Pending / Statistique de Commerce Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 7,223.00 0.00 Implementati 2021-09-05 2021-10-31 2022-04-29 Extérieur_ Achat de and dissemination Quotations Envelope on fournitures et équipements. CF-PDNPD-220788-GO-RFQ / Cartographie du Pending Data collection, production Request for Single Stage - One Recensement_ Achat des IDA / D1710 Post Limited 15,454.00 0.00 Implementati 2021-05-05 2021-06-30 2021-12-27 and dissemination Quotations Envelope Consommables pour l'édition on des cartes. CF-PDNPD-227031-GO-DIR / EHCVM_ Achat complémentaire de 25 tablettes et accessoires ( Data collection, production IDA / D1710 Post Direct Selection Direct 17,182.00 14,507.63 Signed 2021-04-30 2021-04-01 2021-05-05 2021-04-01 2021-06-09 2021-04-09 2021-12-06 25pochettes, 25 glaces de and dissemination protection, 25 cartes mémoires de 8 Gigas, 15 rallonges) CF-PDNPD-227036-GO-DIR / EHCVM_Achat complémentaire des Data collection, production IDA / D1710 Post Direct Selection Direct 3,564.00 14,410.36 Signed 2021-04-30 2021-04-01 2021-05-05 2021-04-01 2021-06-09 2021-04-09 2021-12-06 équipements de terrains ( 35 and dissemination Gilets, 35 polos, 120 lampes rechargeables, 120 sac à dos) CF-PDNPD-229621-GO-DIR / ENA_ Acquisition des Data collection, production IDA / D1710 Post Direct Selection Direct 2,955.00 3,677.60 Signed 2021-04-30 2021-04-19 2021-05-05 2021-04-19 2021-06-09 2021-04-26 2021-12-06 groupes électrogènes et and dissemination multiprises. CF-PDNPD-234164-GO-RFQ / Comptabilité Statistical recovery, Nationale_Achat de 05 Under rehabilitation, Request for Single Stage - One Ordinateurs portables, un IDA / D1710 Post Limited 15,455.00 0.00 Implementati 2021-06-20 2021-08-15 2022-02-11 professionalization and Quotations Envelope (1)vidéo projecteur,s licences on modernization of ICASEES MS Microsoft, Antivirus pour 5 postes. CF-PDNPD-234181-GO-RFQ Statistical recovery, / EHCVM_Achat de 6 Pending rehabilitation, Request for Single Stage - One ordinateurs pour les membres IDA / D1710 Post Limited 8,182.00 0.00 Implementati 2021-06-20 2021-08-15 2022-02-11 professionalization and Quotations Envelope de l'équipe technique de on modernization of ICASEES l'EHCVM. CF-PDNPD-236856-GO-DIR / RGPH_ Acquisition de trois (03) téléphones satellitaires Under supplémentaires et 1 Data collection, production IDA / D1710 Post Direct Selection Direct 27,600.00 0.00 Implementati 2021-06-30 2021-06-14 2021-07-05 2021-08-09 2022-02-05 abonnement semestriels de 6 and dissemination on mois pour 5 telephones ( 2anciens et 3 nouveaux encours d'acquisition) CF-PDNPD-239678-GO-RFQ / RGPH_Achat de 3 Pending Data collection, production Request for Single Stage - One ordinateurs +9 sacs de IDA / D1710 Post Limited 7,273.00 0.00 Implementati 2021-07-20 2021-09-14 2022-03-13 and dissemination Quotations Envelope transports pour Ordinateurs on et 05 disques dur de 1 téra. CF-PDNPD-240643-GO-DIR Pending / Comptabilité Data collection, production IDA / D1710 Post Direct Selection Direct 9,091.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-09 2022-02-05 Nationale_Acquisition du and dissemination on logiciel PROGRESS. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-PDNPD-114928-NC-RFQ Under / RGPH_Véhicule : location Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 2,182.00 0.00 Implementati 2019-05-30 2019-05-25 2019-07-25 2020-01-21 véhicule pour test applicatif et and dissemination Quotations Envelope on fiches Page 4 CF-PDNPD-114935-NC-RFQ / RGPH_ Location d'une villa à Data collection, production Request for Single Stage - One usage de bureau pour les IDA / D1710 Post Limited 65,455.00 80,246.07 Signed 2019-08-06 2019-06-06 2019-10-01 2019-06-19 2020-03-29 and dissemination Quotations Envelope travaux cartographiques (durée 18 mois) CF-PDNPD-122620-NC-RFQ / ENMC3: Location des Data collection, production Request for Single Stage - One véhicules pick-4x4 pour les IDA / D1710 Post Limited 49,636.00 46,009.24 Signed 2019-08-20 2019-07-24 2019-10-15 2019-07-26 2020-04-12 and dissemination Quotations Envelope travaux d'enquêtes et de supervisions. CF-PDNPD-113897-NC-RFQ Statistical recovery, / IPI_ Pause café et Déjeuner rehabilitation, Request for Single Stage - One TF / A5107 Post Limited 310.00 0.00 Canceled 2019-09-04 2019-10-30 2020-04-27 pour l'atelier de formation sur professionalization and Quotations Envelope la rénovation de l'IPI modernization of ICASEES CF-PDNPD-113943-NC-RFQ Statistical recovery, / IPC_Pause Café+ Pause rehabilitation, Request for Single Stage - One déjeuner pour l'atelier de TF / A5107 Post Limited 3,710.00 0.00 Canceled 2019-07-15 2019-09-09 2020-03-07 professionalization and Quotations Envelope formation de 20 agents modernization of ICASEES enquêteurs . CF-PDNPD-114916-NC-RFQ / RGPH_Pause café + déjeuner pour la formation des Data collection, production Request for Single Stage - One IDA / D1710 Post Limited 6,027.00 0.00 Canceled 2019-09-06 2019-11-01 2020-04-29 opérateurs SIG de laboratoire: and dissemination Quotations Envelope Pause-café et déjeuner de 26 participants pour 15 jours CF-PDNPD-114934-NC-RFQ / RGPH_Salle: location de salle Data collection, production Request for Single Stage - One pour la formation des agents IDA / D1710 Post Limited 1,364.00 0.00 Canceled 2019-09-20 2019-11-15 2020-05-13 and dissemination Quotations Envelope de la cartographie pilote pendant 5 jours CF-PDNPD-114989-NC-RFQ / RGPH_Pause café + déjeuner Data collection, production Request for Single Stage - One pour la formation de 25 IDA / D1710 Post Limited 1,982.00 0.00 Canceled 2019-09-20 2019-11-15 2020-05-13 and dissemination Quotations Envelope agents de la cartographie pilote pendant 5 jours CF-PDNPD-113958-NC-RFQ Statistical recovery, / IPC_Location de 3 pik-up rehabilitation, Request for Single Stage - One avec chauffeurs pendant 14 TF / A5107 Post Limited 5,346.00 0.00 Canceled 2019-08-04 2019-09-29 2020-03-27 professionalization and Quotations Envelope jours pour les missions de modernization of ICASEES Supervisions CF-PDNPD-114920-NC-RFQ / RGPH_Véhicule: Location de Data collection, production Request for Single Stage - One 6 véhicules 4 x 4 pendant 15 IDA / D1710 Post Limited 9,818.00 0.00 Canceled 2020-02-05 2020-04-01 2020-09-28 and dissemination Quotations Envelope jours pour les travaux de la cartographie pilote CF-PDNPD-220761-NC-RFQ / ENMC2_Multiplication du Data collection, production rapport final de l'enquête en IDA / D1710 Post Direct Selection Direct 18,588.00 18,159.00 Signed 2021-03-31 2021-02-25 2021-04-05 2021-02-25 2021-05-10 2021-03-04 2021-11-06 and dissemination 500 exemplaires en vu de la vulgarisation. CF-PDNPD-227236-NC-DIR / ENMC3_Multiplication du Pending Data collection, production rapport de l'enquête en IDA / D1710 Post Direct Selection Direct 10,182.00 0.00 Implementati 2021-07-31 2021-08-05 2021-09-09 2022-03-08 and dissemination plusieurs exemplaires en vue on de la vulgarisation. CF-PDNPD-220764-NC-DIR / ENMC3_Multiplication du Data collection, production rapport finale de l'enquête en IDA / D1710 Post Direct Selection Direct 10,182.00 0.00 Canceled 2021-05-31 2021-02-25 2021-06-05 2021-02-25 2021-07-10 2022-01-06 and dissemination plusieurs exemplaires en vu de la vulgarisation. CF-PDNPD-240636-NC-DIR / Staistique de Commerce Pending Data collection, production Extérieur: Fourniture et IDA / D1710 Post Direct Selection Direct 7,000.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-09 2022-02-05 and dissemination Installation du logiciel on EUROTRACE. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-PDND-68139-CS-QCBS / Cabinet d'Audit et d'Expertise -Comptable. Recrutement Statistical recovery, pour trois ans. Contrat rehabilitation, Quality And Cost- IDA / D1710 Prior Open - International 30,000.00 45,594.24 Signed 2018-07-18 2018-08-10 2018-08-08 2018-09-21 2018-10-05 2018-10-19 2018-11-27 2018-11-18 2019-01-10 2018-12-23 2019-04-08 2019-01-27 2019-04-11 2020-01-27 renouvelable par année sur professionalization and Based Selection une base de performance. la modernization of ICASEES prévision budgétaire annuelle est de 10.000 dollars. CF-PDNPD-220759-CS-QCBS / Recrutement d'un cabinet Statistical recovery, d'audit international pour les rehabilitation, Least Cost Pending IDA / D1710 Post Open - International 21,818.00 0.00 2021-12-30 2022-01-20 2022-03-05 2022-04-02 2022-05-02 2022-06-06 2022-07-11 2023-01-07 travaux d'audit de fin du professionalization and Selection Implementation projet prévus pour le mois de modernization of ICASEES mars 2022. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Statistical recovery, Individual CS-REF-11 / Spécialiste en rehabilitation, IDA / D1710 Prior Consultant Open 10,000.00 46,356.02 Signed 2017-07-06 2017-08-24 2017-11-16 2018-07-24 2017-12-08 2017-12-08 2019-12-11 Passation des Marchés professionalization and Selection modernization of ICASEES Page 5 CF-PDND-65273-CS-INDV / Statistical recovery, Manuel de procedure- Individual rehabilitation, Recrutement d'un consultant IDA / D1710 Prior Consultant Open 12,000.00 10,381.32 Signed 2017-07-01 2017-08-19 2017-09-09 2018-07-24 2017-10-14 2017-09-14 2018-04-12 professionalization and pour la redaction du manuel Selection modernization of ICASEES de procédure CF-PDND-65280-CS-CDS / Statistical recovery, Monographie-Recrutement rehabilitation, IDA / D1710 Post Direct Selection Direct 6,500.00 5,651.95 Signed 2017-12-15 2017-08-04 2017-12-25 2018-02-07 2018-02-28 2018-02-07 2018-08-27 d'un consultant pour la professionalization and monographie modernization of ICASEES Statistical recovery, Individual CF-PDND-65247-CS-INDV / rehabilitation, IDA / D1710 Post Consultant Open 4,500.00 396.55 Signed 2017-07-01 2017-08-19 2017-09-09 2018-02-15 2017-10-14 2018-03-06 2018-04-12 Recrutement d'un architecte professionalization and Selection modernization of ICASEES Statistical recovery, CS-REF-15 / Consultant Individual rehabilitation, indice des Prix à la TF / A5107 Post Consultant Open 20,000.00 0.00 Canceled 2017-12-04 2017-12-15 2017-12-17 2017-12-20 2017-12-29 professionalization and Consommation ( IPC) Selection modernization of ICASEES Statistical recovery, CS-REF-9 / Evaluation de la Individual rehabilitation, réhabilitation des bâtiments IDA / D1710 Post Consultant Open 5,000.00 0.00 Canceled 2017-07-06 2017-08-24 2018-01-11 2018-02-15 2018-03-15 professionalization and de l'ICASEES Selection modernization of ICASEES CS-REF-14 / Rédaction du Statistical recovery, Individual Manuel des procéures rehabilitation, IDA / D1710 Prior Consultant Open 50,000.00 0.00 Canceled 2017-07-06 2017-08-06 2017-08-13 2017-09-14 2017-09-14 Administartives, comptables professionalization and Selection et Financières modernization of ICASEES Statistical recovery, CF-PDND-65241-CS-INDV / Individual rehabilitation, Recrutement comptable du IDA / D1710 Prior Consultant Open 52,800.00 45,862.87 Signed 2017-07-03 2017-08-21 2017-09-11 2018-07-24 2017-10-16 2017-12-08 2018-04-14 professionalization and PDNPD Selection modernization of ICASEES PDNPD/004/MEPC/ICASEES/1 Statistical recovery, 7 / Rcrutement d'un rehabilitation, consultant spécial pour la TF / A5107 Prior Direct Selection Direct 13,849.00 11,986.72 Signed 2017-08-31 2017-09-10 2017-11-14 2017-12-20 2018-05-13 professionalization and mise en place de l'indice de modernization of ICASEES prix à la consommation CF-PDND-64658-CS-INDV / Individual Data collection, production Pending Enquêteurs/agents Enquête IDA / D1710 Post Consultant Open 80,000.00 0.00 2018-11-30 2019-01-03 2019-01-18 2019-02-22 2019-03-26 and dissemination Implementation Communale (EC) Selection CF-PDND-84184-CS-INDV / Statistical recovery, Individual PGES: Consultant Spécialiste rehabilitation, IDA / D1710 Post Consultant Limited 9,091.00 0.00 Canceled 2018-11-26 2018-11-28 2018-12-01 2018-11-28 2018-12-22 2019-01-26 2019-07-25 en Plan de Gestion professionalization and Selection Environnemental et Social. modernization of ICASEES Statistical recovery, CF-PDND-86122-CS-INDV / Individual rehabilitation, site web ICASEES- consultant TF / A5107 Post Consultant Limited 12,727.00 10,394.10 Signed 2018-11-20 2018-11-27 2018-11-25 2018-11-27 2018-12-16 2018-12-12 2019-01-20 2018-12-13 2019-07-19 professionalization and pour la création. Selection modernization of ICASEES CF-PDND-79682-CS-INDV / Statistical recovery, site web, recrutement d'un Individual rehabilitation, consultant individuel pour la IDA / D1710 Post Consultant Limited 12,727.00 0.00 Canceled 2018-11-15 2018-10-16 2018-11-20 2018-10-25 2018-12-11 2019-01-15 2019-07-14 professionalization and création du site web de Selection modernization of ICASEES l'ICASEES. CF-PDND-86372-CS-INDV / Individual ENMC2: Deux Consultants Data collection, production IDA / D1710 Post Consultant Limited 2,000.00 3,465.62 Signed 2018-11-26 2018-11-20 2018-12-01 2018-11-20 2018-12-22 2018-12-20 2019-01-26 2018-12-21 2019-07-25 pour la rédaction du rapport and dissemination Selection finale. CF-PDND-64640-CS-INDV / Individual Data collection, production Préparation du Plan de IDA / D1710 Post Consultant Open 20,000.00 0.00 Canceled 2018-06-29 2018-06-26 2018-08-17 2018-09-24 2018-09-07 2018-10-12 2018-11-11 and dissemination cartographie du recensement Selection CF-PDNPD-94917-CS-INDV / EHCVM: Statisticien- Informaticien, recrutement de deux(02) consultants Individual Data collection, production Under individuels en appuis à IDA / D1710 Post Consultant Limited 17,455.00 4,102.48 2019-02-05 2019-04-18 2019-02-10 2019-04-20 2019-03-03 2019-05-22 2019-04-07 2019-05-25 2019-10-04 and dissemination Implementation l'équipe technique de Selection l'enquête pour le CAPI : durée 12 mois, (prix unitaire: 8727 $*2). CF-PDNPD-94900-CS-INDV / EHCVM: Recrutement de trois(03) Consultants Individual Data collection, production Individuels en statistique pour IDA / D1710 Post Consultant Limited 19,638.00 18,169.38 Signed 2019-02-05 2019-04-18 2019-02-10 2019-04-20 2019-03-03 2019-05-22 2019-04-07 2019-05-27 2019-10-04 and dissemination appuyer la coordination de Selection l'enquête (Durée de 12 mois. Prix 6546$*3). CF-PDNPD-94132-CS-CDS / Cartographie: Recrutement d'un expert international en Data collection, production IDA / D1710 Post Direct Selection Direct 185,176.00 149,926.00 Signed 2019-01-30 2019-01-23 2019-02-09 2019-01-24 2019-04-15 2019-02-07 2019-10-12 cartographie censitaire and dissemination numérique pour neuf(09) mois de prestations. CF-PDNPD-95770-CS-INDV / PGES: recrutement d'un Statistical recovery, Individual Consultant Individuel pour rehabilitation, IDA / D1710 Post Consultant Limited 9,091.00 8,569.90 Signed 2019-02-05 2019-02-26 2019-02-10 2019-02-26 2019-03-03 2019-03-26 2019-04-07 2019-03-27 2019-10-04 l'élaboration du Plan de professionalization and Selection Gestion Environnemental et modernization of ICASEES Social. CF-PDNPD-113960-CS-INDV Statistical recovery, / MP_ Réhabilitation de Individual rehabilitation, l'ICASEES : Recrutement d'un IDA / D1710 Post Consultant Limited 14,545.00 0.00 Canceled 2019-06-25 2019-06-30 2019-07-21 2019-08-25 2020-02-21 professionalization and consultant Individuel pour le Selection modernization of ICASEES suivi des travaux Page 6 CF-PDNPD-113919-CS-INDV Statistical recovery, / IPC_Recrutement d'un Individual rehabilitation, consultant Individuel pour le TF / A5107 Post Consultant Direct 14,546.00 11,261.60 Signed 2019-06-20 2019-05-20 2019-06-30 2019-06-03 2019-07-21 2019-06-06 2019-08-25 2019-06-07 2020-02-21 professionalization and lancement de la collecte des Selection modernization of ICASEES prix CF-PDNPD-116043-CS-INDV / RGPH_ Recrutement de 12 Individual Opérateurs SIG et de trois(03) Data collection, production IDA / D1710 Post Consultant Open - National 126,545.00 129,152.32 Signed 2019-09-30 2019-06-10 2019-11-18 2019-09-19 2019-12-09 2019-09-30 2020-01-13 2019-10-08 2020-07-11 chefs d'équipes pour les and dissemination Selection travaux cartographiques de laboratoire CF-PDNPD-115779-CS-INDV Individual Data collection, production / RGPH_ Recrutement d'un IDA / D1710 Post Consultant Open 21,818.18 15,247.53 Signed 2019-09-30 2019-06-10 2019-11-18 2020-01-19 2019-12-09 2020-01-19 2020-01-13 2020-01-19 2020-07-11 and dissemination logisticien pour 18 mois. Selection CF-PDNPD-116088-CS-INDV Individual / RGPH_ Recrutement d'un Data collection, production IDA / D1710 Post Consultant Open 21,818.18 20,193.72 Signed 2019-09-30 2019-06-10 2019-11-18 2019-08-23 2019-12-09 2019-09-11 2020-01-13 2019-09-13 2020-07-11 consultant national en and dissemination Selection cartographie CF-PDNPD-118461-CS-INDV / MP_ Recrutement d'un Statistical recovery, ingénieur/architecte pour le Individual rehabilitation, contrôle technique et la IDA / D1710 Post Consultant Direct 32,727.00 0.00 Canceled 2019-06-30 2019-07-10 2019-07-31 2019-09-04 2020-03-02 professionalization and supervision des travaux de Selection modernization of ICASEES réhabilitation des locaux de l' ICASEES. CF-PDNPD-118466-CS-INDV / EHCVM: Recrutement d'un conseiller technique pour Individual Data collection, production appuyer la mise en œuvre de IDA / D1710 Post Consultant Direct 40,363.63 0.00 Canceled 2019-06-30 2019-07-10 2019-07-10 2019-07-31 2019-09-04 2020-03-02 and dissemination l'enquête Harmonisées sur les Selection Conditions de Vie des ménages. CF-PDNPD-121651-CS-INDV / MP_ Recrutement d'un Statistical recovery, ingénieur/architecte pour le Individual rehabilitation, contrôle technique et la IDA / D1710 Post Consultant Direct 16,364.00 15,126.03 Signed 2019-07-31 2019-07-10 2019-08-10 2019-07-23 2019-08-31 2019-09-17 2019-10-05 2019-09-16 2020-04-02 professionalization and supervision des travaux de Selection modernization of ICASEES réhabilitation des locaux de l' ICASEES. CF-PDNPD-122618-CS-INDV / EHCVM: recrutement d'un conseiller Technique pour Individual Data collection, production appuyer l'Enquête la mise en IDA / D1710 Post Consultant Direct 114,066.00 107,487.80 Signed 2019-07-30 2019-07-19 2019-08-09 2019-07-23 2019-08-30 2019-07-31 2019-10-04 2019-08-06 2020-04-01 and dissemination oeuvre de l'Enquête Selection Harmonisée sur les conditions de Vie des Menages. CF-PDNPD-113929-CS-INDV / EHCVM_recrutement Statistical recovery, Individual Consultant-CAPI pour rehabilitation, TF / A5107 Post Consultant Direct 57,353.00 51,259.96 Signed 2019-09-30 2019-09-16 2019-10-10 2019-09-16 2019-10-31 2019-11-11 2019-12-05 2019-11-14 2020-06-02 l'enquête Harmonisée sur les professionalization and Selection conditions de Vie des modernization of ICASEES ménages CF-PDNPD-114993-CS-INDV / RGPH_Consultant National, Individual expert en cartographie: Data collection, production IDA / D1710 Post Consultant Limited 21,818.00 0.00 Canceled 2019-07-15 2019-07-20 2019-08-10 2019-09-14 2020-03-12 Recrutement pour le suivi des and dissemination Selection travaux cartographiques de laboratoire CF-PDNPD-133471-CS-INDV / MP_Réhabilitation : Statistical recovery, Consultant Individuel, expert Individual rehabilitation, en gestion environnementale IDA / D1710 Post Consultant Direct 14,546.00 0.00 Canceled 2019-10-31 2019-11-10 2019-12-01 2020-01-05 2020-07-03 professionalization and pour le suivi des Selection modernization of ICASEES recommandations issues du rapport du PGES de l'ICASEES. CF-PDNPD-94911-CS-INDV / EHCVM: statistique agricole, Consultant individuel en appui Individual Data collection, production a la coordination de l'enquête IDA / D1710 Post Consultant Limited 8,728.00 0.00 Canceled 2019-02-05 2019-04-20 2019-02-10 2019-04-20 2019-03-03 2019-04-07 2019-10-04 and dissemination pour les aspects lies a Selection l'agriculture. Durée 12 mois, prix 727$*12 CF-PDNPD-134627-CS-INDV / Service des Archives et de la Statistical recovery, Documentation_ Recrutement Individual rehabilitation, d'un consultant Intrnational TF / A5107 Post Consultant Limited 8,182.00 7,701.98 Signed 2019-12-30 2020-02-24 2020-01-04 2020-02-28 2020-01-25 2020-04-15 2020-02-29 2020-04-15 2020-08-27 professionalization and en vue d'appuyer le Chef de Selection modernization of ICASEES service dans l'archivage numérique des données. CF-PDNPD-135772-CS-INDV / RGPH04_Recrutement de 90 agents cartographes dans le Individual cadre des activités de la Data collection, production Under IDA / D1710 Post Consultant Open 244,637.00 0.00 2019-12-30 2019-09-27 2020-02-17 2020-03-09 2020-04-13 2020-10-10 cartographie censitaire and dissemination Implementation Selection numérique du quatrième recensement général de la Population et de l'habitation. CF-PDNPD-145810-CS-INDV / Enquête Commerce Individual Transfrontalier non Data collection, production IDA / D1710 Post Consultant Direct 32,727.00 27,968.91 Signed 2019-12-31 2019-11-27 2020-01-10 2019-12-06 2020-01-31 2019-12-09 2020-03-06 2019-12-12 2020-09-02 enregistré_ Recrutement d'un and dissemination Selection Consultant International pour appuyer la mise en œuvre. CF-PDNPD-122619-CS-INDV / ENMC3: Conseiller Technique pour appuyer la Individual Data collection, production mise en oeuvre de l'Enquête IDA / D1710 Post Consultant Limited 8,182.00 0.00 Canceled 2019-08-31 2019-08-14 2019-09-05 2019-08-16 2019-09-26 2019-10-31 2020-04-28 and dissemination Nationale sur les Selection Monographies Communales 3ème Edition. Page 7 CF-PDNPD-146540-CS-CDS / EHCVM_ recrutement d'un consultant individuel en appui à l'équipe technique pour le Data collection, production CAPI pour une durée de 8 IDA / D1710 Post Direct Selection Direct 6,910.00 6,251.87 Signed 2020-01-31 2019-12-01 2020-02-10 2019-12-05 2020-04-15 2019-12-11 2020-10-12 and dissemination mois. Ce consultant viendra en remplacement d'un précédent qui a démissionner après 6 mois de prestations. CF-PDNPD-149222-CS-INDV Statistical recovery, / ENMC3: Recrutement d'un Individual rehabilitation, consultant individuel, pour le IDA / D1710 Post Consultant Direct 8,182.00 8,396.08 Signed 2019-12-31 2020-07-08 2020-01-10 2020-09-25 2020-01-31 2020-09-25 2020-03-06 2020-08-31 2020-09-02 professionalization and traitement et l'apurement des Selection modernization of ICASEES données de l'enquête. Statistical recovery, CF-PDNPD-149224-CS-INDV Individual rehabilitation, / SPM: Renouvellement du IDA / D1710 Post Consultant Direct 65,455.00 61,083.36 Signed 2019-12-31 2019-12-18 2020-01-10 2019-12-19 2020-01-31 2019-12-20 2020-03-06 2019-12-24 2020-09-02 professionalization and contrat pour deux ans Selection modernization of ICASEES Statistical recovery, CF-PDNPD-149223-CS-INDV Individual rehabilitation, / Comptable: Renouvellement IDA / D1710 Post Consultant Direct 65,455.00 61,083.36 Signed 2019-12-31 2019-12-18 2020-01-10 2019-12-19 2020-01-31 2019-12-20 2020-03-06 2019-12-24 2020-09-02 professionalization and du contrat. Selection modernization of ICASEES CF-PDNPD-153080-CS-INDV / GESTION DES DONNEES ET Statistical recovery, Individual ARCHIVAGE-Assistant rehabilitation, TF / A5107 Post Consultant Direct 38,000.00 36,845.00 Signed 2020-01-31 2020-01-08 2020-02-10 2020-01-09 2020-03-02 2020-01-10 2020-04-06 2020-01-14 2020-10-03 Technique pour la gestion des professionalization and Selection microdonnées et formation modernization of ICASEES NADA CF-PDNPD-153259-CS-INDV / RGPH: Consultant Individual Individuel, Spécialiste en Data collection, production IDA / D1710 Post Consultant Direct 13,091.00 13,855.13 Signed 2020-01-31 2020-01-17 2020-02-10 2020-02-03 2020-03-02 2020-02-06 2020-04-06 2020-02-07 2020-10-03 géomatique pour la and dissemination Selection supervision du laboratoire cartographique. CF-PDNPD-154831-CS-INDV Statistical recovery, / DMNER:Connectivité Individual rehabilitation, numérique: Recrutement d'un TF / A5107 Post Consultant Limited 18,182.00 7,743.11 Signed 2020-03-31 2020-03-01 2020-04-05 2020-03-09 2020-04-26 2020-05-16 2020-05-31 2020-06-18 2020-11-27 professionalization and consultant pour l'amélioration Selection modernization of ICASEES du site Web CF-PDNPD-154921-CS-INDV / Comptabilité Nationale: Individual Data collection, production Consultants pour Rattrapages IDA / D1710 Post Consultant Limited 13,636.00 383.62 Signed 2020-01-31 2020-03-23 2020-02-05 2020-05-28 2020-02-26 2020-06-11 2020-04-01 2020-08-11 2020-09-28 and dissemination des comptes définitifs (2013- Selection 2016) SCN 1993 CF-PDNPD-154896-CS-INDV / Enquête 'IPPI, ICA et ICAS: Individual Data collection, production Recrutement d'un consultant IDA / D1710 Post Consultant Limited 32,727.00 23,471.97 Signed 2020-03-31 2020-08-11 2020-04-05 2020-09-09 2020-04-26 2020-11-23 2020-05-31 2020-11-24 2020-11-27 and dissemination pour l'élaboration des Selection documents techniques. CF-PDNPD-154957-CS-INDV Individual / Enquête Agricole: Data collection, production IDA / D1710 Post Consultant Limited 114,066.00 0.00 Canceled 2020-04-15 2020-03-01 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Recrutement consultant and dissemination Selection international CF-PDNPD-154826-CS-INDV Statistical recovery, / IPC_Recrutement d'un Individual rehabilitation, consultant inter pour la TF / A5107 Post Consultant Direct 27,273.00 16,807.28 Signed 2020-02-14 2020-02-19 2020-02-24 2020-02-24 2020-03-16 2020-02-27 2020-04-20 2020-03-03 2020-10-17 professionalization and création des cinq régions Selection modernization of ICASEES dans Phoenix CF-PDNPD-154824-CS-INDV Statistical recovery, Individual / IPC_Recrutement d'un rehabilitation, TF / A5107 Post Consultant Direct 14,545.00 9,924.56 Signed 2020-02-14 2020-02-19 2020-02-24 2020-02-28 2020-03-16 2020-03-04 2020-04-20 2020-03-06 2020-10-17 expert international pour la professionalization and Selection formation CAPI modernization of ICASEES CF-PDNPD-154902-CS-INDV / Recensement des Unités Individual Economiques: Recrutement Data collection, production Under IDA / D1710 Post Consultant Limited 29,091.00 0.00 2020-03-31 2020-08-11 2020-04-05 2020-04-26 2020-05-31 2020-11-27 d'un consultant pour la and dissemination Implementation Selection préaparation des docuements techniques, CF-PDNPD-146532-CS-INDV / RUE_ recrutement d'un Individual Data collection, production Consultant pour la prépartion IDA / D1710 Post Consultant Limited 27,273.00 0.00 Canceled 2020-02-28 2020-03-04 2020-03-25 2020-04-29 2020-10-26 and dissemination du Recensement des Unités Selection Economiques (RUE) CF-PDNPD-159210-CS-INDV / EHCVM: Recrutement de 100 Individual Data collection, production Under agents enquêteurs dont 25 IDA / D1710 Post Consultant Open 284,000.00 0.00 2020-03-16 2020-06-18 2020-05-04 2020-05-25 2020-06-29 2020-12-26 and dissemination Implementation chefs d'équipes et 75 Selection enquêteurs. CF-PDNPD-162394-CS-INDV Individual / Enquête Agricole: Data collection, production IDA / D1710 Post Consultant Direct 114,066.00 189,388.05 Signed 2020-03-31 2020-03-04 2020-04-10 2020-03-09 2020-05-01 2020-05-28 2020-06-05 2020-05-29 2020-12-02 Recrutement consultant and dissemination Selection international CF-PDNPD-169879-CS-CDS / RGPH_ Recrutement d'un consultant national en Data collection, production IDA / D1710 Post Direct Selection Direct 12,727.00 12,583.20 Signed 2020-06-30 2020-06-01 2020-07-10 2020-06-08 2020-09-13 2020-07-27 2021-03-12 remplacement d'un 1er and dissemination consultant qui a démissionner au mois de février 2020 CF-PDNPD-169882-CS-CDS / RGPH_Renouvellement du Data collection, production contrat du Consultant IDA / D1710 Post Direct Selection Direct 123,090.00 137,940.00 Signed 2020-06-10 2020-05-27 2020-06-20 2020-06-04 2020-08-24 2020-06-11 2021-02-20 and dissemination International pour une durée de 180 jours calendaires Page 8 CF-PDNPD-188372-CS-INDV / IPC_Recrutement d'un Statistical recovery, Individual consultant inter pour la rehabilitation, TF / A5107 Post Consultant Direct 7,845.00 7,830.99 Signed 2020-09-15 2020-08-13 2020-09-25 2020-08-19 2020-10-16 2020-08-25 2020-11-20 2020-08-26 2021-05-19 création des cinq régions professionalization and Selection dans Phoenix. Deuxième modernization of ICASEES partie de la mission après le COVID CF-PDNPD-188373-CS-INDV / IPC_ Recrutement d'un Statistical recovery, Individual consultant International, rehabilitation, TF / A5107 Post Consultant Direct 6,555.00 7,413.58 Signed 2020-09-15 2020-08-17 2020-09-25 2020-08-20 2020-10-16 2020-08-26 2020-11-20 2020-08-27 2021-05-19 Spécialiste en CAPI-Phoenix professionalization and Selection en vue d'achever la mission modernization of ICASEES suspendue à cause du COVID. CF-PDNPD-155052-CS-INDV Individual / DMNER/DR: (IMIS et RCA- Data collection, production IDA / D1710 Post Consultant Limited 18,182.00 19,619.15 Signed 2020-11-30 2020-09-14 2020-12-05 2020-11-05 2020-12-26 2020-12-16 2021-01-30 2020-12-17 2021-07-29 INFO ou autres plateformes); and dissemination Selection Recrutement d'un Consultant CF-PDNPD-154948-CS-INDV / CCE transfrontalier: Individual Data collection, production Pending recrutement de 24 agents IDA / D1710 Post Consultant Open 15,331.00 0.00 2020-11-30 2021-01-18 2021-02-08 2021-03-15 2021-09-11 and dissemination Implementation pour la collecte pour la Selection première vague de collecte CF-PDNPD-190057-CS-INDV / MP_Renouvellement du Statistical recovery, contrat de l’Ingénieur Individual rehabilitation, Architecte pour le contrôle IDA / D1710 Post Consultant Direct 10,910.00 10,803.90 Signed 2020-09-30 2020-09-02 2020-10-10 2020-09-03 2020-10-31 2020-09-18 2020-12-05 2020-09-18 2021-06-03 professionalization and technique et la supervision Selection modernization of ICASEES des travaux de réhabilitation des locaux de l'ICASEES. CF-PDNPD-190076-CS-INDV / EHCVM: Renouvellement des Individual Data collection, production contrats de trois consultants IDA / D1710 Post Consultant Direct 27,273.00 8,677.87 Signed 2020-09-30 2020-09-02 2020-10-10 2020-09-04 2020-10-31 2020-09-08 2020-12-05 2020-09-09 2021-06-03 and dissemination statisticiens pour appuyer la Selection coordination de L'EHCVM CF-PDNPD-190786-CS-INDV Statistical recovery, / DR_ Recrutement d'un Individual rehabilitation, Assistant comptable en vue IDA / D1710 Post Consultant Direct 13,091.00 12,916.37 Signed 2020-10-31 2020-09-13 2020-11-10 2020-09-22 2020-12-01 2020-09-28 2021-01-05 2020-09-30 2021-07-04 professionalization and d'appuyer le Spécialiste en Selection modernization of ICASEES Gestion Financière. CF-PDNPD-190791-CS-INDV / DR_ Recrutement de deux Statistical recovery, (02) chauffeurs en vue Individual rehabilitation, d'appuyer l' ICASEES dans la IDA / D1710 Post Consultant Open 8,728.00 0.00 Canceled 2020-11-30 2021-01-18 2021-02-08 2021-03-15 2021-09-11 professionalization and mise en oeuvre des activités Selection modernization of ICASEES du projet. ( coût unitaire: 4364 $ * 2) = 8.728 $ CF-PDNPD-204973-CS-INDV / EHCVM_ Recrutement d'un administrateur réseau pour Installation Windows 2019 Individual serveur, Configuration Data collection, production IDA / D1710 Post Consultant Direct 1,514.00 1,584.51 Signed 2020-12-15 2020-11-18 2020-12-25 2020-11-19 2021-01-15 2020-11-23 2021-02-19 2020-11-24 2021-08-18 Windows 2019 serveur y and dissemination Selection compris domaine et pare feu, Configuration Windows 2019 serveur y compris domaine et pare feu. CF-PDNPD-205202-CS-INDV / ENA_ Recrutement d'un consultant international, expert en CAPI pour l'appuie à Individual Data collection, production la mise en oeuvre du IDA / D1710 Post Consultant Direct 65,498.00 59,934.38 Signed 2020-11-30 2020-11-18 2020-12-10 2020-12-02 2020-12-31 2020-12-10 2021-02-04 2020-12-10 2021-08-03 and dissemination processus; depuis la Selection formation, le pilote, la programmation et l'enquête principale. CF-PDNPD-210921-CS-INDV Individual Data collection, production / EHCVM_Renouvellement du IDA / D1710 Post Consultant Direct 121,964.00 128,707.10 Signed 2020-12-31 2020-12-24 2021-01-10 2020-12-28 2021-01-31 2020-12-31 2021-03-07 2020-12-31 2021-09-03 and dissemination contrat du Conseiller_Résident Selection CF-PDNPD-210922-CS-INDV Individual Data collection, production / ENA_Recrutement d'un IDA / D1710 Post Consultant Limited 15,273.00 0.00 Canceled 2021-01-31 2020-12-24 2021-02-05 2021-02-26 2021-04-02 2021-09-29 and dissemination Consultant national. Selection CF-PDNPD-154953-CS-INDV / Compte nationaux trimestriels: Recrutement Individual Data collection, production Pending consultant pour la publication IDA / D1710 Post Consultant Limited 18,182.00 0.00 2021-03-31 2021-04-05 2021-04-26 2021-05-31 2021-11-27 and dissemination Implementation et la disséminaion des Selection comptes nationaux trimestriels CF-PDNPD-154924-CS-INDV / Statistiques de commerce extérieur : Consultant pour Individual Data collection, production Under l'appui à l'élaboration des IDA / D1710 Post Consultant Limited 10,909.00 0.00 2021-03-31 2021-03-29 2021-04-05 2021-04-26 2021-05-31 2021-11-27 and dissemination Implementation documents techniques' Selection Collecte des données et production de l'indice CF-PDNPD-154900-CS-INDV / Enquête sur les échanges Individual exterieurs: Recrutement d'un Data collection, production Pending IDA / D1710 Post Consultant Limited 10,909.00 0.00 2021-03-31 2021-04-05 2021-04-26 2021-05-31 2021-11-27 consultant pour l'élaboration and dissemination Implementation Selection des indices du commerce extérieur CF-PDNPD-146533-CS-INDV Individual / IPI_recrutement Consultant Data collection, production Pending IDA / D1710 Post Consultant Limited 14,545.45 0.00 2021-03-31 2021-04-05 2021-04-26 2021-05-31 2021-11-27 pour la rénovation de l'Indice and dissemination Implementation Selection de Production Industrielle Page 9 CF-PDNPD-212679-CS-INDV / ENA_Recrutement d'un consultant National en vue Individual Data collection, production d'appuyer le Consultant IDA / D1710 Post Consultant Direct 15,273.00 13,251.74 Signed 2021-01-31 2021-01-19 2021-02-10 2021-01-22 2021-03-03 2021-02-02 2021-04-07 2021-02-03 2021-10-04 and dissemination International dans la mise en Selection oeuvre de l'Enquête Nationale Agricole (ENA). CF-PDNPD-212683-CS-INDV / DR_Recrutement de deux (02) chauffeurs en vue Statistical recovery, d'appuyer l'ICASEES et Individual rehabilitation, l'ICASEES et l'équipe fiduciaire IDA / D1710 Post Consultant Direct 8,728.00 4,417.25 Signed 2021-01-31 2021-01-19 2021-02-10 2021-01-22 2021-03-03 2021-02-10 2021-04-07 2021-02-12 2021-10-04 professionalization and dans la mise en oeuvre des Selection modernization of ICASEES activités du projet de Données Nécessaires à la Prise de Décision (PDNPD) CF-PDNPD-154489-CS-INDV / Mise à jour de l'Acte Statistique, décret (N 07-052) Statistical recovery, Individual portant CNS : Assistance rehabilitation, IDA / D1710 Post Consultant 9,545.00 0.00 Canceled 2021-03-31 2021-04-05 2021-04-26 2021-05-31 2021-11-27 technique (consultant professionalization and Selection national) pour les nouveaux modernization of ICASEES textes (SNDS, Décrets, Arrêtés, Visas etc.) CF-PDNPD-212943-CS-INDV Individual / RGPH_Renouvellement du Data collection, production IDA / D1710 Post Consultant Direct 21,818.00 16,437.06 Signed 2021-02-28 2021-01-20 2021-03-10 2021-01-25 2021-03-31 2021-02-01 2021-05-05 2021-02-02 2021-11-01 contrat du logisticien pour and dissemination Selection une durée de 12 mois. CF-PDNPD-212945-CS-INDV / RGPH_RENOUVELLEMENT DU CONTRAT DU SUPERVISEUR NATIONAL, SPECIALISTE EN GEOMATIQUE EN VUE D’APPUYER LES CONSULTANTS Individual Data collection, production (INTERNATIONAL ET IDA / D1710 Post Consultant Direct 13,090.00 13,272.55 Signed 2021-02-28 2021-01-20 2021-03-10 2021-01-25 2021-03-31 2021-02-08 2021-05-05 2021-04-09 2021-11-01 and dissemination NATIONAL) DANS LE CADRE Selection DES ACTIVITES DE LA CARTOGRAPHIE CENSITAIRE DU RECENSEMENT GENERAL DE LA POPIULATION ET DE L’HABIT CF-PDNPD-218358-CS-INDV / Gestion des Données NADA_Recrutement de Statistical recovery, Individual consultant international pour rehabilitation, IDA / D1710 Post Consultant Direct 30,506.00 23,483.00 Signed 2021-02-15 2021-02-12 2021-02-24 2021-02-13 2021-03-17 2021-03-10 2021-04-21 2021-03-11 2021-10-18 la finalisation de l’archivage professionalization and Selection des données et document modernization of ICASEES électroniques sécurisées en ligne (NADA). CF-PDNPD-220604-CS-INDV Statistical recovery, / Hébergement du site web: Individual rehabilitation, Recrutement d'un webmaster IDA / D1710 Post Consultant Limited 32,727.00 33,497.10 Signed 2021-03-31 2021-03-02 2021-04-05 2021-03-31 2021-04-26 2021-05-07 2021-05-31 2021-05-17 2021-11-27 professionalization and pour la gestion quotidienne Selection modernization of ICASEES du site de l'ICASEES. CF-PDNPD-220614-CS-INDV Statistical recovery, / E-Bibliothèque: Recrutement Individual rehabilitation, Under d'un consultant pour la IDA / D1710 Post Consultant Limited 10,910.00 0.00 2021-05-31 2021-06-15 2021-06-05 2021-06-26 2021-07-31 2022-01-27 professionalization and Implementation création d'une bibliothèque Selection modernization of ICASEES électronique à l'ICASEES. CF-PDNPD-154742-CS-INDV / DMNER_Contrôle qualité: Statistical recovery, Individual Recrutement d'un consultant rehabilitation, IDA / D1710 Post Consultant Limited 18,182.00 16,902.59 Signed 2021-05-31 2021-03-02 2021-06-05 2021-04-09 2021-06-26 2021-05-18 2021-07-31 2021-05-19 2022-01-27 international pour professionalization and Selection l’élaboration d'un manuel de modernization of ICASEES contrôle-qualité CF-PDNPD-220652-CS-INDV Statistical recovery, Individual / Direction des rehabilitation, IDA / D1710 Post Consultant Direct 19,636.00 19,023.37 Signed 2021-03-31 2021-02-25 2021-04-10 2021-03-01 2021-05-01 2021-03-03 2021-06-05 2021-03-10 2021-12-02 Ressources_Recrutement d'un professionalization and Selection Assistant Projet. modernization of ICASEES CF-PDNPD-220765-CS-INDV / ENMC3_Recrutement de trois (03) Consultants Individual Data collection, production Pending nationaux pour une prestation IDA / D1710 Post Consultant Limited 3,636.00 0.00 2021-05-31 2021-06-05 2021-06-26 2021-07-31 2022-01-27 and dissemination Implementation d'environ dix (10) en vu de Selection l'analyse du rapport de l'enquête. CF-PDNPD-220768-CS-INDV / Compte Nationaux_Recrutement de Individual trois (03) consultants Data collection, production IDA / D1710 Post Consultant Limited 39,273.00 13,398.84 Signed 2021-05-31 2021-03-22 2021-06-05 2021-03-31 2021-06-26 2021-05-14 2021-07-31 2021-05-17 2022-01-27 nationaux pour une durée de and dissemination Selection douze (12) mois en vue d'appuyer la Direction de la Comptabilité Nationale. CF-PDNPD-220779-CS-INDV Individual / RUE_Recrutement de trente Data collection, production Pending IDA / D1710 Post Consultant Limited 54,545.00 0.00 2021-07-31 2021-08-05 2021-08-26 2021-09-30 2022-03-29 (30) agents de collecte pour la and dissemination Implementation Selection mise en œuvre de l'enquête. CF-PDNPD-220782-CS-INDV / Statistique de Commerce Individual extérieur_Recrutement d'un Data collection, production Pending IDA / D1710 Post Consultant Limited 12,727.00 0.00 2021-07-31 2021-08-05 2021-08-26 2021-09-30 2022-03-29 Consultant International pour and dissemination Implementation Selection appui à l'élaboration des documents techniques. CF-PDNPD-220783-CS-INDV / Statistique de Commerce Individual Data collection, production Pending extérieur IDA / D1710 Post Consultant Limited 14,545.00 0.00 2021-08-31 2021-09-05 2021-09-26 2021-10-31 2022-04-29 and dissemination Implementation Eurotrace_Recrutement des Selection agents de collecte. Page 10 CF-PDNPD-154899-CS-INDV / Enquête d'opinion : Recrutement d'un consultant Individual Data collection, production Pending International pour IDA / D1710 Post Consultant Limited 18,182.00 0.00 2021-10-31 2021-11-05 2021-11-26 2021-12-31 2022-06-29 and dissemination Implementation l'élaboration de solde Selection d'opinion des producteurs économiques. CF-PDNPD-220787-CS-INDV / Enquête Conjoncture_Recrutement Individual d'un consultant International Data collection, production Pending IDA / D1710 Post Consultant Limited 18,182.00 0.00 2021-09-30 2021-10-05 2021-10-26 2021-11-30 2022-05-29 pour appuyer la Direction de and dissemination Implementation Selection la Statistique économique dans la mise en œuvre de l'enquête. CF-PDNPD-220789-CS-INDV Individual / RGPH04_Renouvellement du Data collection, production IDA / D1710 Post Consultant Direct 14,545.00 12,793.97 Signed 2021-04-30 2021-03-29 2021-05-10 2021-03-31 2021-05-31 2021-04-06 2021-07-05 2021-04-09 2022-01-01 contrat du consultant national and dissemination Selection pour 140 jours ouvrables. CF-PDNPD-220766-CS-INDV / Compte nationaux Individual Data collection, production _Recrutement d'un Conseiller IDA / D1710 Post Consultant Direct 127,272.00 0.00 Canceled 2021-06-30 2021-07-10 2021-07-31 2021-09-04 2022-03-03 and dissemination Résident pour une durée de Selection douze (12) mois. CF-PDNPD-228209-CS-CDS / RGPH_Renouvellement du Data collection, production Under contrat du consultant IDA / D1710 Post Direct Selection Direct 154,454.00 0.00 2021-04-30 2021-05-27 2021-05-10 2021-05-27 2021-07-14 2022-01-10 and dissemination Implementation International en cartographie censitaire numérique. CF-PDNPD-229301-CS-INDV / Comptabilité Nationale_Recrutement d'un Individual Consultant Internationale en Data collection, production IDA / D1710 Post Consultant Direct 127,272.00 124,800.00 Signed 2021-05-31 2021-04-19 2021-06-10 2021-04-19 2021-07-01 2021-05-24 2021-08-05 2021-05-25 2022-02-01 vue d'appuyer la Direction and dissemination Selection Technique dans les travaux de passage du SCN1993 au SCN2008 à l'ICASEES. CF-PDNPD-220637-CS-INDV / Renouvellement du contrat Statistical recovery, de l'ingénieur /architecte pour Individual rehabilitation, Pending le Contrôle technique et la IDA / D1710 Post Consultant Direct 18,182.00 0.00 2021-08-31 2021-09-10 2021-10-01 2021-11-05 2022-05-04 professionalization and Implementation supervision des travaux de la Selection modernization of ICASEES réhabilitation des locaux de l'ICASEES. Page 11 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: April 29]: Revision 1 of Updated Procurement Plan, April 2017] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year April 2016 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,000,000 All 2. NCB (Goods) Above US$ 100,000 No prior review 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) Above US$ 10 million ICB prior review 5. (Non-Consultant Services) Below US$ 100,000 First contract 6. Sole Source selection (Works) Above US$ 100,000 All contracts 6. Request for Quotation (Works) No prior review 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA July 9, 2010 4. Reference to (if any) Project Operational/Procurement Manual: TBD 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 67.436 2 yes Prior of the ICB (Works) Summary No Prior of the ICB (Goods) Summary 8.843 10 No Post of the NCB (Works) Summary No Post 1st of the NCB contrac (Goods) t for Prior Review Summary No Prior of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold July 9, 2010 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 8.14 19 Prior The of number for one remainin of packag g 18 are contracts e of 2.3 under that will million post be let US review under QCBS Summary 0.95 12 Post CQS and of number review INDV of contracts that will be let under other methods July 9, 2010 PROCUREMENT Burkina Faso : Transport and Urban Infrastructure Development Project PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2017-05-16 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151832 GPN Date: 2017-04-23 Project Name: Transport and Urban Infrastructure Development Project Loan / Credit No: IDA / 58590 D Executing Agency(ies): euxieme Programme Sectoriel des Transports et du Tourisme WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BF-PST2-12319-CW-RFB / Travaux de bitumage du Component A: Inter-urban Single Stage - One 51,000,000.0 51,182,006. 2019-07- IDA / 58590 Prior Request for Bids Open - International Signed 2016-12-27 2017-01-16 2017-03-02 2017-05-22 2017-06-21 2017-08-10 2017-09-04 tronçon Manga-Zabré (79km) Infrastructure Envelope 0 42 31 et voirie urbaine a Manga BF-PST2-123786-CW-RFB / Component B: Urban Single Stage - One 2020-06- Construction du village IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 558,000.00 0.00 Canceled 2019-10-29 2019-11-03 2019-12-03 2019-12-10 2019-12-30 Envelope 07 artisanal de Ouahigouya Regional Capitals BF-PST2-9857-CW-RFB / Component B: Urban Single Stage - One 2020-06- Construction de la gare IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 910,000.00 0.00 Canceled 2019-10-29 2019-11-03 2019-12-03 2019-12-13 2019-12-30 Envelope 07 routière de Manga Regional Capitals BF-PST2-9858-CW-RFB / Component B: Urban Single Stage - One 2020-06- Construction d'un marché à IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 910,000.00 0.00 Canceled 2019-10-29 2019-11-03 2019-12-03 2019-12-13 2019-12-30 Envelope 07 bétail à Manga Regional Capitals BF-PST2-9859-CW-RFB / Component B: Urban Single Stage - One 2020-07- Mise à niveau de l'abattoir de IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 910,000.00 0.00 Canceled 2019-10-29 2019-11-03 2019-12-03 2019-12-13 2019-12-30 Envelope 07 Manga Regional Capitals BF-PST2-9854-CW-RFB / Component B: Urban Single Stage - One 2020-07- Construction de la gare IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 1,270,700.00 0.00 Canceled 2019-10-29 2019-11-03 2019-12-03 2019-12-13 2019-12-29 Envelope 06 routière de Dédougou Regional Capitals BF-PST2-9850-CW-RFB / Travaux d’aménagement d'un Component B: Urban Single Stage - One 1,007,766.0 2020-04- canal de drainage des eaux IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 1,200,000.00 Signed 2019-08-06 2019-11-10 2019-08-19 2019-09-18 2019-12-24 2019-09-25 2020-01-08 2019-10-10 2020-02-04 Envelope 0 07 pluviales à Koudougou d’un Regional Capitals linéaire de 2,5 km BF-PST2-126039-CW-RFB / Component B: Urban Request for Single Stage - One 2020-07- Construction marché du IDA / 58590 Infrastructure in Targeted Post Limited 182,000.00 0.00 Canceled 2019-11-19 2020-01-14 Quotations Envelope 12 secteur 6 de Dédougou Regional Capitals BF-PST2-125608-CW-RFB / Travaux d’aménagement de Component B: Urban Single Stage - One 3,879,971.3 2020-03- voiries urbaines et d'éclairage IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 4,400,000.00 Signed 2019-08-07 2019-09-05 2019-08-19 2019-09-18 2019-08-30 2019-09-25 2019-09-05 2019-10-10 2019-11-14 Envelope 0 06 public dans la commune de Regional Capitals Tenkodogo BF-PST2-126435-CW-RFB / Travaux d’aménagement de Component B: Urban Single Stage - One 5,451,887.9 2020-09- voiries urbaines et d’éclairage IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - International 6,110,000.00 Signed 2019-11-28 2019-11-27 2019-12-03 2019-11-25 2020-01-14 2020-01-15 2020-02-13 2020-02-05 2020-03-19 2020-02-28 Envelope 8 15 public dans les communes de Regional Capitals Ouahigouya BF-PST2-126440-CW-RFB / Travaux d’aménagement de Component B: Urban Single Stage - One 5,330,238.9 2020-09- voiries urbaines et d’éclairage IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - International 5,964,000.00 Signed 2019-11-21 2019-11-25 2019-11-26 2019-11-25 2020-01-07 2020-01-15 2020-02-06 2020-02-05 2020-03-12 2020-02-28 Envelope 3 08 public dans les communes de Regional Capitals Koudougou BF-PST2-9841-CW-RFB / Component B: Urban Single Stage - One 2019-09- Aménagement d'une zone de IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 820,000.00 0.00 Canceled 2018-12-12 2018-12-13 2019-01-24 2019-02-23 2019-03-13 Envelope 09 maraichage à Ouahigouya Regional Capitals BF-PST2-9826-CW-RFB / Component B: Urban Bitumage de voies primaires Single Stage - One 16,436,363.0 2019-11- IDA / 58590 Infrastructure in Targeted Prior Request for Bids Open - International 0.00 Canceled 2018-12-05 2018-12-10 2019-02-08 2019-02-23 2019-05-09 et assainissement à Envelope 0 05 Regional Capitals Koudougou Ouahigouya et Tenkodogo BF-PST2-9848-CW-RFB / Component B: Urban Single Stage - One 2018-12- Aménagement d'une zone de IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 820,000.00 0.00 Canceled 2018-04-19 2018-04-24 2018-05-24 2018-06-23 2018-08-06 Envelope 04 maraichage à Manga Regional Capitals BF-PST2-9325-CW-RFB / Component A: Inter-urban Single Stage - One 2018-12- IDA / 58590 Post Request for Bids Open - National 622,000.00 0.00 Canceled 2018-02-20 2018-02-21 2018-04-04 2018-05-04 2018-06-08 Travaux Dindeogo zonse Infrastructure Envelope 05 BF-PST2-9856-CW-RFQ / Component B: Urban Request for Single Stage - One 2019-07- Construction du marché du IDA / 58590 Infrastructure in Targeted Post Limited 180,000.00 0.00 Canceled 2018-11-17 2019-01-12 Quotations Envelope 11 secteur 6 de Dédougou Regional Capitals BF-PST2-172435-CW-RFB / Component B: Urban Pending Single Stage - One 2021-01- Travaux de bitumage de 1,6 IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 1,396,363.00 0.00 Implementat 2020-06-10 2020-06-15 2020-07-15 2020-07-20 2020-08-04 Envelope 31 km de voiries à Tenkodogo Regional Capitals ion BF-PST2-9852-CW-RFB / Component B: Urban Aménagement de canaux Single Stage - One 2019-11- IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 1,200,000.00 0.00 Canceled 2018-12-04 2018-12-09 2019-01-20 2019-02-19 2019-05-04 d'assainissement pluvial à Envelope 30 Regional Capitals Koudougou (2,5km) BF-PST2-201036-CW-RFB / Travaux de construction Component B: Urban Single Stage - One 1,197,685.1 2021-05- d’équipements structurants à IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 1,454,545.00 Signed 2020-10-22 2020-08-19 2020-10-27 2020-11-26 2020-09-22 2020-12-06 2020-10-21 2020-12-22 2020-11-24 Envelope 7 21 Dédougou : une gare routière Regional Capitals et un marché au secteur 6 Page 1 BF-PST2-201046-CW-RFB / Travaux de construction d’équipements structurants : Component B: Urban Single Stage - One 2,342,973.8 2021-05- une gare routière ; un marché IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 2,727,272.00 Signed 2020-10-22 2020-08-19 2020-10-27 2020-11-26 2020-09-21 2020-12-06 2020-10-21 2020-12-23 2020-11-24 Envelope 4 22 a bétail a Manga, et la Regional Capitals réhabilitation de l’abattoir de Manga BF-PST2-201105-CW-RFB / Construction du village Component B: Urban Pending Single Stage - One 2021-05- artisanal et Réhabilitation de IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 872,727.00 0.00 Implementat 2020-10-22 2020-10-27 2020-11-26 2020-12-03 2020-12-22 Envelope 21 la plateforme maraichère à Regional Capitals ion OUAHIGOUYA BF-PST2-233970-CW-RFB / Component B: Urban Request for Bids - Pending Aménagement d'une zone de Single Stage - One 2021-12- IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National Works French Civil 1,636,364.00 0.00 Implementat 2021-05-17 2021-06-06 2021-07-11 2021-07-21 2021-08-24 maraichage à Ouahigouya et Envelope 07 Regional Capitals Law (French) SPD ion Manga GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-43142-GO-RFB / Acquisition d'équipements de bureau et matériels Component A: Inter-urban Single Stage - One IDA / 58590 Post Request for Bids Open - National 1,090,909.00 314,250.25 Completed 2018-01-22 2019-01-07 2018-02-05 2018-03-19 2019-02-07 2018-04-18 2019-03-29 2018-06-06 2019-07-24 2018-09-04 2020-03-17 informatiques pour les Infrastructure Envelope structures impliquées dans le projet BF-PST2-43500-GO-RFB / Component D: Project Single Stage - One Acquisition d’un logiciel de IDA / 58590 Post Request for Bids Limited 40,000.00 41,023.68 Completed 2016-12-27 2016-08-30 2017-01-10 2016-08-29 2017-02-21 2016-09-15 2017-03-23 2016-09-15 2017-06-05 2017-01-17 2017-08-04 2017-05-05 Management Envelope comptabilité BF-PST2-64631-GO-RFQ / Acquisition de mobilier et Component D: Project Request for Single Stage - One IDA / 58590 Post Limited 90,000.00 12,788.82 Completed 2018-07-10 2019-06-28 2018-09-16 2019-10-24 2018-10-16 2020-03-26 fourniture de bureau au profit Management Quotations Envelope du SP-PST BF-PST2-92376-GO-RFB / Acquisition et installation de Component B: Urban signalisations routières pour Single Stage - One IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 360,000.00 200,992.53 Signed 2019-01-09 2019-05-20 2019-01-29 2019-03-12 2019-06-19 2019-04-11 2019-09-10 2019-06-05 2019-11-04 2019-09-03 la mise en œuvre du plan Envelope Regional Capitals provisoire de circulation de la commune de Ouagadougou BF-PST2-125937-GO-RFQ / Acquisition de matériel Component C: Institutional Request for Single Stage - One informatique et de la licence IDA / 58590 Support and Sector Post Limited 100,000.00 79,593.80 Signed 2019-10-10 2020-09-22 2019-12-17 2020-11-26 2020-02-15 Quotations Envelope SIG, suivi de la formation à Governance son utilisation BF-PST2-164369-GO-RFB / Fourniture et installation de la Component C: Institutional Single Stage - One signalisation directionnelles IDA / 58590 Support and Sector Post Request for Bids Open - National 290,909.00 200,648.81 Signed 2020-03-30 2020-05-07 2020-04-04 2020-05-19 2020-06-08 2020-06-08 2020-07-23 2020-09-25 2020-10-21 Envelope dans la commune de Governance Ouagadougou BF-PST2-164202-GO-RFB / Acquisition et installation de Component B: Urban signalisations routières pour Single Stage - One IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 127,272.00 200,221.78 Signed 2020-03-12 2019-10-09 2020-03-17 2020-04-16 2019-11-08 2020-05-01 2020-07-27 2020-06-10 2020-06-09 2020-09-08 la mise en œuvre du plan Envelope Regional Capitals provisoire de circulation de la Commune de Ouagadougou BF-PST2-164475-GO-RFQ / Component D: Project Request for Single Stage - One Acquisition de fournitures de IDA / 58590 Post Limited 15,000.00 8,714.11 Signed 2020-09-19 2020-10-21 2020-11-26 2020-11-19 2020-12-26 Management Quotations Envelope bureau au profit du SP-PST BF-PST2-201209-GO-RFB / Acquisition et installation de Component B: Urban signalisations routières pour Single Stage - One IDA / 58590 Infrastructure in Targeted Post Request for Bids Open - National 127,272.00 213,017.07 Completed 2020-10-23 2019-05-20 2020-10-28 2020-11-27 2019-06-19 2020-12-12 2021-01-21 2019-11-04 2021-04-21 2020-10-22 la mise en œuvre du plan Envelope Regional Capitals provisoire de circulation de la Commune de Ouagadougou BF-PST2-211885-GO-RFQ / Acquisition de traceurs, Component B: Urban Pending Request for Single Stage - One imprimante et Drones dans le IDA / 58590 Infrastructure in Targeted Post Limited 55,636.00 0.00 Implementati 2021-03-20 2021-05-29 2021-08-27 Quotations Envelope cadre de la matérialisation du Regional Capitals on zonage des SDAU BF-PST2-233960-GO-RFQ / Pending Component D: Project Request for Single Stage - One Acquisition d’un véhicule au IDA / 58590 Post Limited 81,818.00 0.00 Implementati 2021-05-27 2021-06-07 2021-07-07 Management Quotations Envelope profit d’Agetib on BF-PST2-233964-GO-RFQ / Pending Component D: Project Request for Single Stage - One Acquisition d’un véhicule au IDA / 58590 Post Limited 63,636.00 0.00 Implementati 2021-05-27 2021-06-09 2021-07-09 Management Quotations Envelope profit de ACOMOD on BF-PST2-234216-GO-DIR / Component C: Institutional Pending Acquisition de véhicules au IDA / 58590 Support and Sector Post Direct Selection Direct 1,004,727.00 0.00 Implementati 2021-05-24 2021-06-08 2021-07-22 2021-11-19 profit des Directions de Governance on l’Urbanisme et du CTGO BF-PST2-234044-GO-RFB / Component C: Institutional Under Single Stage - One Acquisition de chaussures de IDA / 58590 Support and Sector Post Request for Bids Open - National 251,364.00 0.00 Implementati 2021-05-31 2021-06-01 2021-06-15 2021-07-20 2021-08-04 2021-08-31 2021-11-29 Envelope sécurité, balises et panneaux Governance on BF-PST2-234045-GO-RFB / Component C: Institutional Under Single Stage - One Acquisition de GPS au profit IDA / 58590 Support and Sector Post Request for Bids Open - International 1,678,182.00 0.00 Implementati 2021-05-28 2021-06-01 2021-06-11 2021-06-04 2021-07-26 2021-08-05 2021-09-09 2021-12-08 Envelope du MUHV Governance on BF-PST2-234070-GO-RFQ / Acquisition mobilier, Pending fourniture de bureau de Component D: Project Request for Single Stage - One IDA / 58590 Post Limited 51,627.00 0.00 Implementati 2021-06-05 2021-07-25 2021-08-24 sabots de Denver au profit du Management Quotations Envelope on CTGO et de la police municipale de Ouagadougou Page 2 BF-PST2-234071-GO-RFQ / Pending Acquisition de logiciels, Component D: Project Request for Single Stage - One IDA / 58590 Post Limited 95,000.00 0.00 Implementati 2021-06-09 2021-07-29 2021-09-27 matériel et de consommables Management Quotations Envelope on informatiques BF-PST2-222752-GO-RFQ / Pending Acquisition de matériels Component D: Project Request for Single Stage - One IDA / 58590 Post Limited 18,181.00 0.00 Implementati 2021-06-04 2021-06-24 2021-07-24 informatiques au profit de Management Quotations Envelope on AGETIB BF-PST2-234245-GO-RFQ / Pending Acquisition matériel Component D: Project Request for Single Stage - One IDA / 58590 Post Limited 19,090.00 0.00 Implementati 2021-05-29 2021-06-19 2021-07-19 informatique au profit Management Quotations Envelope on d’ACOMO NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-126091-NC-RFQ / Recrutement d'une agence de communication pour la Component C: Institutional Request for Single Stage - One gestion événementielle de la IDA / 58590 Support and Sector Post Limited 77,700.00 81,718.46 Signed 2019-09-17 2019-10-02 2019-11-12 2019-12-04 2019-12-12 Quotations Envelope campagne de communication Governance poids lourds de la Mairie de Ouagadougou BF-PST2-164763-NC-DIR / Renouvellement de Component D: Project IDA / 58590 Post Direct Selection Direct 26,000.00 23,287.90 Signed 2020-03-30 2020-02-19 2020-04-04 2020-05-19 2020-05-09 2020-05-19 2021-05-04 l'assurance maladie du Management personnel du SP-PST BF-PST2-207520-NC-RFQ / Pending Component D: Project Request for Single Stage - One Maintenance du réseau IDA / 58590 Post Limited 18,181.00 0.00 Implementati 2021-03-24 2021-05-19 2022-05-19 Management Quotations Envelope informatique du SP-PST on BF-PST2-229500-NC-RFQ / Pending Réalisation du film Component D: Project Request for Single Stage - One IDA / 58590 Post Limited 18,181.00 0.00 Implementati 2021-05-05 2021-06-30 2021-07-30 documentaire sur les Management Quotations Envelope on réalisations du PTDIU CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-12242-CS-QCBS / Etudes de faisabilité Component B: Urban Quality And Cost- techniques, économiques IDA / 58590 Infrastructure in Targeted Post Open - National 82,000.00 0.00 Canceled 2017-05-18 2017-06-08 2017-07-02 2017-07-12 2017-07-22 2017-08-01 2017-09-14 2017-12-13 Based Selection pour le maraichage à Regional Capitals Ouahigouya BF-PST2-12256-CS-QCBS / Component B: Urban Etudes de faisabilité Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - National 82,000.00 0.00 Canceled 2017-06-22 2017-07-13 2017-08-06 2017-08-11 2017-08-21 2017-08-31 2017-10-14 2018-01-12 techniques, économiques Based Selection Regional Capitals pour le maraichage à Manga BF-PST2-12286-CS-QCBS / Etude de mise en place d'un Component C: Institutional Quality And Cost- plan de jalonnement IDA / 58590 Support and Sector Post Open - International 545,455.00 0.00 Canceled 2017-10-11 2017-11-01 2017-11-25 2017-11-30 2017-12-10 2017-12-29 2018-02-11 2018-11-08 Based Selection favorisant les itinéraires de Governance contournement BF-PST2-12287-CS-QCBS / Component C: Institutional Etude de restructuration et Quality And Cost- IDA / 58590 Support and Sector Post Open - National 91,000.00 0.00 Canceled 2017-11-27 2017-12-18 2018-01-11 2018-01-16 2018-01-26 2018-02-14 2018-03-30 2018-12-25 extension du réseau de la Based Selection Governance SOTRACO BF-PST2-12318-CS-QCBS / Contrôle et surveillance des travaux de construction et de Component A: Inter-urban Quality And Cost- IDA / 58590 Prior Open - International 2,300,000.00 1,977,724.29 Signed 2016-10-30 2016-11-20 2017-02-03 2017-03-03 2017-05-03 2017-03-13 2017-07-13 2017-04-17 2017-10-03 2017-06-30 2017-10-20 2019-08-19 bitumage de 79 km Route Infrastructure Based Selection Principale et 9km de bretelle et terre BF-PST2-12316-CS-QCBS / Component D: Project Quality And Cost- Élaboration d’une stratégie et IDA / 58590 Post Open - National 36,000.00 27,109.48 Signed 2016-03-09 2015-04-03 2016-03-30 2016-05-13 2015-08-06 2016-06-10 2015-10-02 2016-07-10 2015-11-05 2016-08-14 2016-04-20 2016-09-18 2017-09-25 2016-12-17 Management Based Selection d’un plan de communication BF-PST2-16754-CS-CQS / Recrutement d'un consultant Component C: Institutional Consultant pour la réalisation de IDA / 58590 Support and Sector Post Qualification Open - National 181,818.00 173,878.34 Signed 2017-06-22 2017-05-24 2017-07-13 2017-08-26 2017-10-11 2017-09-25 2017-11-22 2017-10-30 2017-12-21 2018-04-28 l'Enquête origine-destination Governance Selection à Ouaga BF-PST2-16752-CS-QCBS / Contrôle et surveillance des travaux de construction et de Component A: Inter-urban Quality And Cost- IDA / 58590 Prior Open - International 2,300,000.00 0.00 Canceled 2016-10-30 2017-06-04 2016-11-29 2017-01-02 2017-02-16 2017-03-02 2017-04-11 2017-06-24 2019-08-13 bitumage de 79 km Route Infrastructure Based Selection Principale et 9km de bretelle et terre BF-PST2-16762-CS-CQS / Component C: Institutional Consultant Recrutement d'un consultant IDA / 58590 Support and Sector Post Qualification Open - National 136,363.00 126,346.02 Signed 2018-03-12 2018-03-09 2018-04-02 2018-05-16 2018-07-03 2018-06-15 2018-08-28 2018-08-19 2018-10-29 2019-02-15 pour la révision du code de Governance Selection l'Urbanisme BF-PST2-12273-CS-CQS / Etudes environnementales et Component B: Urban Consultant sociales de la gare routière, IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 82,000.00 0.00 Canceled 2017-08-21 2017-09-11 2017-10-05 2017-10-15 2017-11-28 2018-01-27 du marché à bétail, mise à Regional Capitals Selection niveau de l'abattoir a Manga Page 3 BF-PST2-12272-CS-QCBS / Etudes de faisabilité Component B: Urban techniques, économiques de Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - National 272,000.00 0.00 Canceled 2017-07-18 2017-08-08 2017-09-21 2017-09-26 2017-10-06 2017-10-25 2017-12-08 2018-03-08 la gare routière, du marché à Based Selection Regional Capitals bétail, mise à niveau de l'abattoir a Manga BF-PST2-12275-CS-QCBS / Contrôle et surveillance des Component B: Urban travaux de construction de la Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - National 272,000.00 0.00 Canceled 2018-03-13 2018-04-03 2018-04-27 2018-05-02 2018-05-12 2018-05-22 2018-07-05 2019-01-31 gare routière, du marché à Based Selection Regional Capitals bétail, mise à niveau de l'abattoir a Manga BF-PST2-10058-CS-QCBS / Etudes de faisabilité techniques et économiques de Component B: Urban Quality And Cost- la voirie (Koudougou, IDA / 58590 Infrastructure in Targeted Post Open - National 357,000.00 0.00 Canceled 2017-06-12 2017-05-22 2017-07-03 2017-07-31 2017-08-14 2017-08-24 2017-09-28 2017-11-16 2018-05-15 Based Selection Ouahigouya, Tenkodogo) y Regional Capitals compris l'assainissement de Koudougou BF-PST2-10033-CS-QCBS / Etudes techniques et Component A: Inter-urban Quality And Cost- IDA / 58590 Post Open - International 327,000.00 0.00 Canceled 2017-04-17 2017-05-08 2017-06-21 2017-07-19 2017-08-18 2017-09-22 2017-12-05 2018-06-03 économiques construction de Infrastructure Based Selection 40 ouvrages BF-PST2-41738-CS-CQS / Etudes techniques et Consultant economiques et DAO pour la Component A: Inter-urban IDA / 58590 Post Qualification Open - National 3,237,000.00 0.00 Canceled 2018-01-25 2018-02-15 2018-03-31 2018-04-30 2018-06-13 2018-11-10 construction de 40 ouvrages Infrastructure Selection de franchissement et des remblais de raccordement  BF-PST2-10039-CS-QCBS / Etudes techniques et Component A: Inter-urban Quality And Cost- IDA / 58590 Post Open - National 364,000.00 0.00 Canceled 2017-03-30 2017-04-20 2017-06-03 2017-07-01 2017-07-31 2017-09-04 2017-11-17 2018-09-13 économiques de 200km de Infrastructure Based Selection pistes BF-PST2-10086-CS-QCBS / Etudes environnementales et sociales de la voirie Component B: Urban Quality And Cost- (Koudougou, Ouahigouya, IDA / 58590 Infrastructure in Targeted Post Open - National 357,000.00 0.00 Canceled 2017-11-07 2017-11-28 2017-12-26 2018-01-30 2018-02-09 2018-03-16 2018-04-29 2018-12-25 Based Selection Tenkodogo) y compris Regional Capitals l'assainissement de Koudougou BF-PST2-12238-CS-CQS / Etudes environnementales et Component B: Urban Consultant sociales pour l'aménagement IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 90,909.00 0.00 Canceled 2017-08-10 2017-08-31 2017-09-24 2017-10-24 2017-11-28 2018-01-27 d'une zone de maraichage à Regional Capitals Selection Manga BF-PST2-12265-CS-QCBS / Etudes de faisabilité Component B: Urban techniques, économiques Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - National 127,000.00 0.00 Canceled 2017-05-30 2017-06-20 2017-07-14 2017-07-24 2017-08-03 2017-09-07 2017-10-21 2018-01-19 pour Based Selection Regional Capitals gare routière, et marche secteur 6 de Dedougou BF-PST2-12284-CS-QCBS / Politique de stationnement des véhicules particulier, des 2 roues et des véhicules et Component B: Urban Quality And Cost- des véhicules de liaisons dans IDA / 58590 Infrastructure in Targeted Post Open - International 272,727.00 253,061.53 Signed 2017-06-06 2017-07-12 2017-07-06 2017-09-14 2017-12-29 2017-10-04 2018-02-07 2017-10-24 2018-03-07 2017-11-17 2018-06-28 2017-12-23 2018-10-12 2018-07-21 Based Selection le centre Ouaga (plan de Regional Capitals circulation et de stationnement dans le centre- ville de Ouagadougou) BF-PST2-45003-CS-CQS / Consultant Études techniques et Component A: Inter-urban IDA / 58590 Post Qualification Open - National 327,000.00 308,658.65 Signed 2018-01-25 2018-01-19 2018-02-15 2018-03-31 2018-04-11 2018-04-30 2018-11-22 2018-06-04 2018-12-06 2018-12-01 économiques de 40 ouvrages Infrastructure Selection de franchissement BF-PST2-52652-CS-CQS / Component B: Urban Consultant Etude faisabilité construction IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 120,455.00 107,338.06 Signed 2018-03-07 2017-10-27 2018-04-06 2018-07-05 2018-10-16 2018-08-14 2018-08-27 2018-10-28 2018-11-08 2019-02-25 canal drainage Koudougou Regional Capitals Selection BF-PST2-41697-CS-CQS / Etudes de faisabilité Component B: Urban Consultant technique, économique de la IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 272,727.00 0.00 Canceled 2018-02-14 2018-03-07 2018-04-20 2018-05-20 2018-06-24 2018-06-25 gare routière, du marché à Regional Capitals Selection bétail, mise à niveau de l'abattoir a Manga BF-PST2-41745-CS-CQS / Component B: Urban Consultant Etudes de faisabilite IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 127,000.00 0.00 Canceled 2018-02-12 2018-03-05 2018-04-18 2018-05-18 2018-07-01 2018-10-29 techniques, économiques gare Regional Capitals Selection routiere et marche secteur 6 BF-PST2-66968-CS-CQS / Etudes pour Component B: Urban Consultant l'aménagementzone de IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 163,636.00 107,796.82 Signed 2018-07-05 2018-06-05 2018-07-26 2018-09-24 2019-02-01 2018-10-24 2019-03-19 2018-12-28 2019-08-07 2019-04-27 maraichage à Manga sur 20 Regional Capitals Selection hectares et à Ouahigouya sur 50 hectares BF-PST2-12278-CS-QCBS / Etude de faisabilité pour l'aménagement de zones Component B: Urban d'activités économiques dans Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - International 801,818.00 0.00 Canceled 2018-05-09 2018-05-30 2018-06-23 2018-06-27 2018-07-07 2018-07-31 2018-09-28 2019-03-27 12 villes (aménagement Based Selection Regional Capitals initialement prévu) et Evaluation environnementale et sociale BF-PST2-12267-CS-CQS / Component B: Urban Consultant Etudes environnementales IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 64,000.00 0.00 Canceled 2018-08-12 2018-09-16 2018-11-20 2018-12-30 2019-03-30 2019-05-29 gare routière et marché de Regional Capitals Selection Dedougou Page 4 BF-PST2-12260-CS-CQS / Component B: Urban Consultant Etudes environnementales IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 90,909.00 0.00 Canceled 2018-05-23 2018-06-13 2018-08-02 2018-09-01 2018-11-15 2019-01-14 aménagement maraichage à Regional Capitals Selection Manga BF-PST2-41741-CS-CQS / Etudes environnementales et Component B: Urban Consultant sociales de la voirie IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 357,000.00 0.00 Canceled 2018-02-15 2018-03-08 2018-04-21 2018-05-21 2018-07-04 2018-10-02 (Koudougou, Ouahigouya, Regional Capitals Selection Tenkodogo) BF-PST2-92311-CS-CQS / Etudes de faisabilité technico- économique des travaux Component B: Urban Consultant d'aménagement de voies IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 164,941.00 143,553.25 Signed 2018-12-20 2018-04-09 2019-01-10 2019-03-11 2018-07-03 2019-04-10 2018-09-12 2019-06-14 2018-10-29 2019-11-11 urbaines à Koudougou sur Regional Capitals Selection 7,00 km + deux (2) ouvrages de franchissements BF-PST2-92312-CS-CQS / Etudes de faisabilité technico- Component B: Urban Consultant économique des travaux IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 132,650.00 115,496.37 Signed 2018-12-20 2018-04-09 2019-01-10 2019-03-11 2018-07-03 2019-04-10 2018-09-24 2019-06-14 2018-10-29 2019-11-11 d'aménagement de voies Regional Capitals Selection urbaines à Ouahigouya sur 7,00 Km BF-PST2-92313-CS-CQS / Etudes de faisabilité technico- Component B: Urban Consultant économique des travaux IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 99,360.00 85,665.80 Signed 2018-12-26 2018-07-03 2019-01-16 2019-03-17 2018-07-03 2019-04-16 2018-08-24 2019-06-20 2018-10-29 2019-11-17 d'aménagement de voies Regional Capitals Selection urbaines à Tenkodogo (5,00 km) BF-PST2-92314-CS-CQS / Etudes techniques détaillées et élaboration des dossiers Component B: Urban Consultant d'appel d'offres pour les IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 145,000.00 0.00 Canceled 2018-12-21 2019-01-11 2019-02-24 2019-03-26 2019-04-30 2019-09-27 travaux de construction de Regional Capitals Selection quarante (40) ouvrages de franchissement dans la Boucle du Mouhoun et le Nord BF-PST2-92315-CS-CQS / Etude de faisabilité technico- économique pour la Component B: Urban Consultant réalisation de 200 km de IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 169,885.00 145,790.72 Signed 2018-12-20 2018-03-01 2019-01-10 2019-03-11 2018-05-10 2019-04-10 2018-06-14 2019-06-14 2018-07-20 2019-12-11 pistes rurales par la méthode Regional Capitals Selection mécanisée dans les régions du Centre-Sud et Centre-Est BF-PST2-92316-CS-CQS / Etudes techniques détaillées et élaboration des dossiers Component B: Urban Consultant d'appel d'offres pour les IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 200,000.00 0.00 Canceled 2018-12-20 2019-01-10 2019-03-11 2019-04-10 2019-06-14 2019-11-11 travaux de construction de Regional Capitals Selection quarante (40) ouvrages de franchissement dans la Boucle du Mouhoun et le Nord BF-PST2-92317-CS-CQS / Etude de faisabilité technico- économique pour la Component B: Urban Consultant réalisation de 200 km de IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 181,700.00 69,626.27 Signed 2018-12-20 2018-01-20 2019-01-10 2019-03-11 2018-05-14 2019-04-10 2018-06-04 2019-06-14 2018-07-26 2019-11-11 pistes rurales par la méthode Regional Capitals Selection mécanisée dans les régions de la Boucle du Mouhoun et Centre -Ouest BF-PST2-92356-CS-CQS / Etude de faisabilité technico- économique pour la Component B: Urban Consultant réalisation de 200 km de IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 80,000.00 68,653.87 Signed 2018-12-21 2018-03-01 2019-01-11 2019-03-12 2018-05-10 2019-04-11 2018-06-14 2019-06-15 2018-07-20 2019-12-12 pistes rurales par la méthode Regional Capitals Selection mécanisée dans la région du Nord BF-PST2-67549-CS-QCBS / Etude de faisabilité pour Component B: Urban l'aménagement de zones Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - International 801,818.00 0.00 Canceled 2018-06-28 2018-10-09 2018-07-28 2018-10-09 2018-09-16 2018-10-31 2018-11-20 2018-12-20 2019-02-17 2019-08-16 d'activités économiques dans Based Selection Regional Capitals 12 villes capitales régionales du Burkina Faso BF-PST2-66971-CS-QCBS / Etudes de faisabilité pour les travaux de construction Component B: Urban d'équipements structurants : Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - National 549,000.00 0.00 Canceled 2018-07-16 2018-08-06 2018-10-20 2018-11-19 2018-12-19 2019-02-08 2019-04-14 2019-08-12 gare routière à Manga et Based Selection Regional Capitals Dédougou, marché à bétail à Manga, la réhabilitation de l'abattoir BF-PST2-92380-CS-QCBS / Etudes techniques et économiques et DAO pour les Component A: Inter-urban Quality And Cost- travaux d'aménagement de IDA / 58590 Post Open - International 106,000.00 100,438.78 Signed 2018-12-21 2017-08-28 2019-01-11 2019-02-24 2019-03-24 2017-12-18 2019-04-23 2018-01-22 2019-05-28 2018-08-08 2019-07-02 2018-10-12 2019-11-29 Infrastructure Based Selection 100 km de pistes en HIMO dans la Boucle du Mouhoun et le Nord BF-PST2-92381-CS-QCBS / Etudes techniques et économiques et DAO pour les Component A: Inter-urban Quality And Cost- travaux d'aménagement de IDA / 58590 Post Open - International 127,000.00 118,907.74 Signed 2018-12-21 2017-08-28 2019-01-11 2019-02-24 2018-04-11 2019-03-24 2017-12-18 2019-04-23 2018-01-23 2019-05-28 2018-02-09 2019-07-02 2018-10-12 2019-11-29 Infrastructure Based Selection 100 km de pistes en HIMO dans le Centre Sud, Centre Est, et Centre Ouest BF-PST2-10036-CS-QCBS / Etudes techniques et Component A: Inter-urban Quality And Cost- IDA / 58590 Post Open - International 236,000.00 0.00 Canceled 2017-03-13 2017-08-04 2017-04-03 2017-05-17 2017-11-10 2017-06-14 2017-12-18 2017-07-14 2018-01-18 2017-08-18 2018-06-28 2017-09-22 2018-04-20 économiques de 100km de Infrastructure Based Selection pistes en HIMO Page 5 BF-PST2-41739-CS-CQS / Etudes techniques et Consultant Component A: Inter-urban economiques et DAO pour les IDA / 58590 Post Qualification Open - National 364,000.00 0.00 Canceled 2018-02-05 2018-01-20 2018-02-26 2018-04-11 2018-05-14 2018-05-11 2018-06-27 2018-06-24 2018-12-21 Infrastructure travaux d' amenagements de Selection 200km de pistes BF-PST2-41731-CS-CQS / Etudes de faisabilite Component B: Urban Consultant techniques et économiques de IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 357,000.00 0.00 Canceled 2018-01-30 2018-03-07 2018-02-20 2018-04-05 2018-07-03 2018-05-05 2018-06-18 2018-11-15 la voirie (Koudougou, Regional Capitals Selection Ouahigouya, Tenkodogo) BF-PST2-12276-CS-QCBS / Elaboration d'un schéma de Component C: Institutional Quality And Cost- drainage des eaux pluviales IDA / 58590 Support and Sector Post Open - International 801,818.00 0.00 Canceled 2018-05-09 2018-04-09 2018-05-30 2018-07-06 2018-06-23 2018-06-26 2018-07-06 2018-07-25 2018-09-22 2019-03-21 Based Selection dans 12 villes et Evaluation Governance environnementale et sociale BF-PST2-104701-CS-QCBS / Audits annuels 2019, 2020 et Component D: Project Quality And Cost- IDA / 58590 Post Open - National 127,272.00 81,982.39 Signed 2019-03-29 2019-10-14 2019-04-19 2019-06-18 2020-01-16 2019-07-16 2020-02-17 2019-08-15 2020-02-27 2019-09-25 2020-03-11 2019-11-18 2020-05-22 2022-11-17 2021 des comptes des Management Based Selection projets du SP-PST BF-PST2-12270-CS-CQS / Contrôle et surveillance des Component B: Urban Consultant travaux de la gare routière et IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 145,000.00 149,895.18 Signed 2019-10-14 2020-04-12 2019-10-28 2019-11-15 2020-06-15 2019-11-22 2019-12-29 2020-08-10 2020-06-26 du marché du secteur 6 de Regional Capitals Selection Dédougou BF-PST2-125767-CS-CQS / Suivi-contrôle des travaux Component B: Urban Consultant d’aménagement de voiries IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 118,888.00 107,034.23 Signed 2019-08-14 2019-08-24 2019-09-13 2019-09-27 2019-10-10 2019-09-30 2019-10-10 2019-11-12 2020-03-06 urbaines dans la commune de Regional Capitals Selection Tenkodogo BF-PST2-125923-CS-QCBS / Etudes de faisabilité, études techniques détaillées et Component B: Urban Quality And Cost- élaboration du Dossier IDA / 58590 Infrastructure in Targeted Post Open - International 472,727.00 315,646.45 Signed 2019-08-01 2018-12-31 2019-08-02 2019-08-04 2019-05-27 2019-08-07 2019-07-17 2019-08-12 2019-09-06 2019-08-18 2019-08-30 2019-10-01 2019-11-15 Based Selection d’Appel d’Offres pour les Regional Capitals travaux de construction d’équipements structurants BF-PST2-92379-CS-QCBS / Etudes de faisabilité, études techniques détaillées et Component B: Urban Quality And Cost- élaboration du Dossier IDA / 58590 Infrastructure in Targeted Post Open - International 549,000.00 0.00 Canceled 2019-01-09 2019-01-08 2019-01-30 2019-01-18 2019-03-15 2019-04-12 2019-05-12 2019-06-16 2019-08-04 2019-12-02 Based Selection d'Appel d'Offres pour les Regional Capitals travaux de construction d'équipements structurants BF-PST2-125929-CS-CQS / Etude sur la situation de Component C: Institutional Consultant référence des indicateurs de Under IDA / 58590 Support and Sector Post Qualification Open - National 181,818.00 0.00 2019-08-20 2021-01-18 2019-09-10 2019-10-24 2019-11-23 2020-01-21 2020-07-19 l’observatoire urbain national Implementation Governance Selection dans les trente-six (36) villes du BURKINA FASO BF-PST2-126443-CS-CQS / Suivi-contrôle des Travaux Component B: Urban Consultant d’aménagement d'un canal de IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 60,227.00 60,759.25 Signed 2019-08-14 2019-11-20 2019-09-13 2019-09-25 2020-01-01 2019-09-30 2019-10-10 2020-02-04 2020-03-06 drainage des eaux pluviales à Regional Capitals Selection Koudougou d’un linéaire de 2,5 km BF-PST2-126448-CS-CQS / Suivi-contrôle des Travaux Component B: Urban Consultant d’aménagement de voiries IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 118,182.00 116,373.78 Signed 2019-08-14 2019-11-20 2019-09-13 2019-09-30 2020-01-01 2019-10-10 2019-12-09 2020-02-26 2020-07-01 urbaines dans les communes Regional Capitals Selection de Koudougou BF-PST2-126450-CS-CQS / Suivi-contrôle des Travaux Component B: Urban Consultant d’aménagement de voiries IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 119,588.00 124,784.32 Signed 2019-08-14 2019-11-12 2019-09-13 2019-10-03 2020-01-01 2019-10-13 2020-02-05 2019-12-09 2020-02-24 2020-07-01 urbaines dans les communes Regional Capitals Selection de Ouahigouya BF-PST2-115701-CS-CQS / Mise en place et Component C: Institutional Consultant opérationnalisation d'un IDA / 58590 Support and Sector Post Qualification Open - National 136,363.00 0.00 Canceled 2019-06-30 2019-07-21 2019-09-03 2019-10-03 2019-12-01 2020-04-29 dispositif national de suivi des Governance Selection prix de transports des marchandises BF-PST2-92378-CS-CQS / Recrutement d'une maîtrise Component B: Urban Consultant d'ouvrage déléguée pour IDA / 58590 Infrastructure in Targeted Post Qualification Open - International 300,000.00 0.00 Canceled 2019-04-23 2019-05-14 2019-06-27 2019-07-27 2019-08-31 2020-02-27 appuyer les communes du Regional Capitals Selection projet dans le volet urbain BF-PST2-148600-CS-CQS / Réalisation d’une Etude Component C: Institutional Consultant Under d’Impact Environnemental et IDA / 58590 Support and Sector Post Qualification Open - National 150,000.00 0.00 2019-12-20 2020-04-17 2020-01-10 2020-02-23 2020-03-24 2020-04-28 2020-06-27 Implementation social du corridor de Governance Selection Transport Public de Ouaga BF-PST2-148645-CS-CQS / Réalisation d’un Plan Component C: Institutional Consultant Under d’Actions de Réinstallation IDA / 58590 Support and Sector Post Qualification Open - National 150,000.00 0.00 2019-12-23 2020-04-24 2020-01-13 2020-02-26 2020-03-27 2020-05-01 2020-06-30 Implementation du corridor de Transport Governance Selection Public de Ouagadougou BF-PST2-12276-CS-QCBS-2 / Elaboration d'un schéma de drainage des eaux pluviales Component C: Institutional Quality And Cost- dans 12 villes capitales IDA / 58590 Support and Sector Post Open - International 802,000.00 729,313.69 Signed 2020-01-15 2018-07-02 2020-02-05 2020-03-20 2019-02-20 2020-04-17 2019-05-03 2020-05-17 2019-06-11 2020-06-21 2019-08-16 2020-07-26 2020-02-07 2021-07-26 Based Selection régionales du Burkina Faso et Governance Evaluation environnementale et sociale Page 6 BF-PST2-92375-CS-QCBS / Études de faisabilité pour l’aménagement de zones d’activités économiques dans douze (12) villes capitales Component B: Urban Quality And Cost- régionales du Burkina Faso IDA / 58590 Infrastructure in Targeted Post Open - International 802,000.00 729,380.31 Signed 2018-12-21 2018-04-09 2019-01-11 2019-02-24 2020-02-18 2019-03-24 2019-05-03 2019-04-23 2019-07-22 2019-05-28 2019-08-30 2019-07-11 2020-02-05 2020-01-07 Based Selection (Bobo-Dioulasso, Banfora, Regional Capitals Koudougou, Ouahigouya, Kaya, Gaoua, Tenkodogo, Manga, Fada N’Gourma, Ziniaré, Dori et Dédougou) BF-PST2-12262-CS-CQS / Contrôle et surveillance des Component B: Urban Consultant travaux pour l'aménagement IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 82,000.00 0.00 Canceled 2018-02-05 2018-02-26 2018-03-22 2018-04-05 2018-05-19 2018-12-15 d'une zone de maraichage à Regional Capitals Selection Manga BF-PST2-12253-CS-CQS / Component B: Urban Consultant Contrôle pour l'aménagement IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 80,000.00 0.00 Canceled 2018-10-24 2018-11-14 2018-12-08 2018-12-22 2019-02-04 2019-08-03 à Ouahigouya zone Regional Capitals Selection maraichage BF-PST2-42109-CS-CQS / Component B: Urban Consultant Plan de jalonnement IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 200,000.00 0.00 Canceled 2018-04-24 2018-05-15 2018-06-28 2018-07-28 2018-09-10 2019-03-09 favorisant les itineraires de Regional Capitals Selection contournement BF-PST2-12281-CS-QCBS / Component B: Urban Quality And Cost- faisabilité pour mise en place IDA / 58590 Infrastructure in Targeted Post Open - International 454,545.00 0.00 Canceled 2018-05-17 2018-06-07 2018-07-05 2018-08-19 2018-08-29 2018-09-22 2018-11-05 2019-03-05 Based Selection TCSP à Ouagadougou Regional Capitals BF-PST2-92374-CS-QCBS / Etude de faisabilité pour Component B: Urban l'aménagement de zones Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - International 209,090.00 0.00 Canceled 2018-12-21 2019-01-11 2019-02-24 2019-03-24 2019-04-23 2019-05-28 2019-07-11 2020-01-07 d'activités économiques à Based Selection Regional Capitals Manga, Tenkodogo, Fada N'Gourma BF-PST2-92372-CS-QCBS / Etude de faisabilité pour Component B: Urban l'aménagement de zones Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - International 209,090.00 0.00 Canceled 2018-12-21 2019-01-11 2019-02-24 2019-03-24 2019-04-23 2019-05-28 2019-07-11 2020-01-07 d'activités économiques à Based Selection Regional Capitals Bobo-Dioulasso, Banfora et Gaoua BF-PST2-92302-CS-QCBS / Elaboration d'un schéma de Component B: Urban drainage des eaux pluviales à Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - International 209,090.00 0.00 Canceled 2018-12-20 2019-01-10 2019-02-23 2019-03-23 2019-04-22 2019-05-27 2019-07-01 2019-12-28 Ouahigouya, Koudougou, et Based Selection Regional Capitals Dédougou et Evaluation environnementale et sociale BF-PST2-92301-CS-QCBS / Elaboration d'un schéma de Component B: Urban drainage des eaux pluviales à Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - International 209,090.00 0.00 Canceled 2018-12-20 2019-01-19 2019-03-10 2019-04-24 2019-05-14 2019-07-03 2019-08-31 2020-02-27 Manga, Tenkodogo, Fada Based Selection Regional Capitals N'Gourma et Evaluation environnementale et sociale BF-PST2-92373-CS-QCBS / Etude de faisabilité pour Component B: Urban Quality And Cost- l'aménagement de zones IDA / 58590 Infrastructure in Targeted Post Open - International 209,090.00 0.00 Canceled 2018-12-21 2019-01-11 2019-02-24 2019-03-24 2019-04-23 2019-05-28 2019-07-11 2020-01-07 Based Selection d'activités économiques à Regional Capitals Kaya, Ziniaré et Dori BF-PST2-92300-CS-QCBS / Elaboration d'un schéma de Component B: Urban drainage des eaux pluviales à Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - International 209,090.00 0.00 Canceled 2018-12-20 2018-04-09 2019-01-19 2019-03-10 2019-02-05 2019-04-24 2019-05-14 2019-07-03 2019-08-31 2020-02-27 Kaya, Ziniaré et Dori et Based Selection Regional Capitals Evaluation environnementale et sociale BF-PST2-42112-CS-CQS / Component B: Urban Consultant Etude de restructuration et IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 136,000.00 0.00 Canceled 2018-05-15 2018-06-05 2018-07-19 2018-08-18 2018-10-01 2019-02-28 extension du réseau de la Regional Capitals Selection SOTRACO BF-PST2-42112-CS-CQS-2 / Component B: Urban Consultant Etude de restructuration et IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 136,000.00 0.00 Canceled 2020-05-20 2020-06-10 2020-07-24 2020-08-23 2020-10-06 2021-03-05 extension du réseau de la Regional Capitals Selection SOTRACO BF-PST2-144583-CS-CQS / Recrutement d'un cabinet Consultant Component D: Project d'assistance au recrutement IDA / 58590 Post Qualification Open - National 5,000.00 0.00 Canceled 2019-11-20 2020-01-29 2019-12-11 2020-01-24 2020-02-23 2020-03-29 2020-05-28 Management du personnel complémentaire Selection du SP-PST BF-PST2-124599-CS-CQS / Component B: Urban Consultant suivi-contrôle de la IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 57,000.00 0.00 Canceled 2019-10-21 2019-11-05 2019-12-04 2019-12-05 2019-12-29 2020-06-26 construction du village Regional Capitals Selection artisanal de Ouahigouya BF-PST2-172427-CS-CQS / Contrôle et surveillance des travaux de construction Component B: Urban Consultant Under d’équipements structurants à IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 90,909.00 0.00 2020-05-06 2020-05-11 2020-05-27 2020-06-11 2020-06-21 2020-07-01 2020-12-28 Implementation Ouahigouya: un village Regional Capitals Selection artisanal et la réhabilitation de la plateforme maraichère BF-PST2-172428-CS-CQS / Contrôle et surveillance des travaux de construction Component B: Urban Consultant Under d’équipements structurants à IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 272,727.00 0.00 2020-05-06 2020-05-08 2020-05-27 2020-06-11 2020-06-21 2020-07-01 2020-12-28 Implementation Manga: une gare routière, un Regional Capitals Selection marché a bétail et la réhabilitation de l’abattoir BF-PST2-147506-CS-CQS / Etude de Faisabilité des Component C: Institutional Consultant Contrats Pluriannuels avec IDA / 58590 Support and Sector Post Qualification Open - National 100,000.00 0.00 Canceled 2019-12-20 2019-12-02 2020-01-10 2020-01-08 2020-02-23 2020-02-11 2020-03-24 2020-04-28 2020-10-25 obligation de résultat (GENIS) Governance Selection au Burkina Faso Page 7 BF-PST2-92298-CS-QCBS / Elaboration d'un schéma de Component B: Urban drainage des eaux pluviales à Quality And Cost- IDA / 58590 Infrastructure in Targeted Post Open - International 209,090.00 0.00 Canceled 2018-12-20 2018-07-02 2019-01-19 2019-03-10 2019-03-07 2019-04-24 2019-05-14 2019-07-03 2019-08-31 2020-02-27 Bobo-Dioulasso, Banfora et Based Selection Regional Capitals Gaoua et Evaluation environnementale et sociale BF-PST2-10138-CS-QCBS / Contrôle et surveillance des travaux de la voirie Component B: Urban Quality And Cost- (Koudougou, Ouahigouya, IDA / 58590 Infrastructure in Targeted Post Open - National 357,000.00 0.00 Canceled 2018-10-24 2018-11-14 2018-12-13 2019-01-12 2019-02-01 2019-03-08 2019-04-21 2019-10-18 Based Selection Tenkodogo) y compris Regional Capitals l'assainissement de Koudougou BF-PST2-187282-CS-CQS / Consultant Audit organisationel, Component D: Project Under IDA / 58590 Post Qualification Open - National 72,727.00 0.00 2020-08-28 2020-08-20 2020-09-12 2020-10-11 2020-10-26 2020-11-19 2021-01-03 institutionnel et fonctionnel Management Implementation Selection du SP-PST BF-PST2-198458-CS-CQS / Consultant Component D: Project Pending Maintenance du reseau IDA / 58590 Post Qualification Open - National 18,181.00 0.00 2020-11-30 2020-12-21 2021-02-03 2021-03-05 2021-05-03 2022-05-03 Management Implementation informatique du SP-PST Selection BF-PST2-233986-CS-CQS / Component B: Urban Consultant Contrôle et surveillance des Under IDA / 58590 Infrastructure in Targeted Post Qualification Open - National 163,636.00 0.00 2021-05-21 2021-05-17 2021-06-04 2021-07-03 2021-07-10 2021-08-19 2021-12-02 travaux de maraichage à Implementation Regional Capitals Selection Ouahigouya et Manga BF-PST2-234052-CS-CQS / Component C: Institutional Consultant Manuel de procédures Under IDA / 58590 Support and Sector Post Qualification Open - National 54,545.00 0.00 2021-05-20 2021-05-17 2021-06-03 2021-06-25 2021-07-02 2021-08-06 2021-09-20 administratives, comptables Implementation Governance Selection et financière pour le CTGO BF-PST2-234060-CS-CQS / Document de plan d’action Component C: Institutional Consultant pour le renforcement des Under IDA / 58590 Support and Sector Post Qualification Open - National 54,545.00 0.00 2021-05-18 2021-05-17 2021-06-01 2021-06-23 2021-07-03 2021-08-07 2021-09-21 capacités des acteurs du Implementation Governance Selection système de transports urbains à Ouagadougou BF-PST2-234068-CS-CQS / Component C: Institutional Consultant Under Document de plan d’action IDA / 58590 Support and Sector Post Qualification Open - National 18,182.00 0.00 2021-05-19 2021-06-11 2021-06-02 2021-06-24 2021-07-01 2021-08-05 2021-09-19 Implementation 2021-2024 du CTGO Governance Selection BF-PST2-234069-CS-CQS / Développement d’un système Component C: Institutional Consultant Under d’information géographique IDA / 58590 Support and Sector Post Qualification Open - National 54,545.00 0.00 2021-05-17 2021-06-11 2021-05-31 2021-06-22 2021-07-02 2021-08-06 2021-11-04 Implementation de la voirie urbaine du grand Governance Selection Ouaga INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-12293-CS-INDV / Individual Recrutement d'un consultant Component D: Project IDA / 58590 Post Consultant Limited 54,545.00 0.00 Canceled 2017-06-07 2017-06-12 2017-07-03 2017-08-07 2017-09-06 pour l'élaboration d'un plan Management Selection d'action de lutte VIH/SIDA BF-PST2-12317-CS-INDV / Etudes de définition des Individual besoins de connectivité Component A: Inter-urban IDA / 58590 Post Consultant Limited 45,000.00 45,223.91 Signed 2016-10-30 2016-09-21 2016-11-29 2017-05-24 2016-12-20 2017-06-28 2017-02-02 2017-10-17 2017-04-03 virtuelle ainsi que impact Infrastructure Selection environnemental et social dans les agglomérations BF-PST2-39408-CS-INDV / Individual Component D: Project Recrutement d'un Spécialiste IDA / 58590 Post Consultant Open 76,364.00 0.00 Canceled 2017-12-28 2018-02-15 2018-03-08 2018-04-12 2018-04-30 Management en développement social Selection BF-PST2-9861-CS-INDV / Individual Component A: Inter-urban Contrôle et surveillance des IDA / 58590 Post Consultant Limited 50,000.00 0.00 Canceled 2018-03-21 2018-03-26 2018-04-16 2018-05-21 2018-11-17 Infrastructure travaux de connectivité Selection BF-PST2-42117-CS-INDV / Individual Etude diagnostic du système Component D: Project IDA / 58590 Post Consultant Limited 25,000.00 27,552.46 Signed 2018-01-30 2018-02-21 2018-02-04 2018-03-06 2018-02-25 2018-04-20 2018-04-10 2018-05-26 2018-05-25 de passation des marchés des Management Selection activités du PTDIU BF-PST2-43470-CS-INDV / Etude de préfaisabilité des Component B: Urban Individual investissements du volet IDA / 58590 Infrastructure in Targeted Post Consultant Limited 45,000.00 53,888.66 Signed 2016-11-20 2016-07-28 2016-12-20 2016-11-03 2017-01-24 2016-12-29 2017-04-18 2017-04-19 2017-07-17 urbain à Dédougou, Regional Capitals Selection Koudougou, Ouahigouya lot 1 BF-PST2-43469-CS-INDV / Etude de préfaisabilité des Component B: Urban Individual investissements du volet IDA / 58590 Infrastructure in Targeted Post Consultant Limited 45,000.00 30,839.78 Signed 2016-11-20 2016-07-26 2016-12-04 2016-11-03 2017-01-18 2016-12-29 2017-04-07 2017-04-19 2017-07-06 urbain à Manga et Tenkodogo Regional Capitals Selection ( lot 2) BF-PST2-59641-CS-INDV / Component B: Urban Individual Impact social pour la IDA / 58590 Infrastructure in Targeted Post Consultant Open 98,181.00 86,774.00 Signed 2018-04-17 2018-07-02 2018-07-11 2018-10-12 2018-08-10 2019-01-15 2018-10-04 2019-02-01 2019-01-02 délimitation du zonage des Regional Capitals Selection SDAU BF-PST2-41682-CS-INDV / Etudes environnementales et Component B: Urban Individual sociales de la gare routière, IDA / 58590 Infrastructure in Targeted Post Consultant Limited 82,000.00 0.00 Canceled 2018-02-13 2018-02-14 2018-03-07 2018-04-11 2018-04-20 du marché à bétail, mise à Regional Capitals Selection niveau de l'abattoir a Manga Page 8 BF-PST2-92383-CS-INDV / réalisation des notices d'impact environnemental et social (NIES) pour construction Component B: Urban Individual de la gare routière et du IDA / 58590 Infrastructure in Targeted Post Consultant Open 50,000.00 68,564.90 Signed 2018-12-21 2018-05-25 2019-02-19 2019-03-01 2019-03-21 2019-03-07 2019-05-04 2019-06-10 2019-07-03 marché de bétail de Manga et Regional Capitals Selection la construction du marché du secteur 6 et de la gare routière de Dédougou BF-PST2-92384-CS-INDV / réalisation des notices d'impact environnemental et Component B: Urban Individual social (NIES) pour les IDA / 58590 Infrastructure in Targeted Post Consultant Open 50,000.00 684,474.24 Signed 2018-12-21 2018-10-08 2019-02-19 2019-02-27 2019-03-21 2019-03-07 2019-05-04 2019-05-28 2019-07-03 constructions de voiries et de Regional Capitals Selection caniveaux à Tenkodogo, Koudougou et Ouahigouya BF-PST2-92385-CS-INDV / réalisation des notices d'impact environnemental et social (NIES) pour le Component B: Urban Individual Under maraichage et la construction IDA / 58590 Infrastructure in Targeted Post Consultant Open 50,000.00 0.00 2018-12-21 2018-06-12 2019-02-19 2019-03-21 2019-05-04 2019-07-03 Implementation du village artisanal de Regional Capitals Selection Ouahigouya et le maraichage ainsi que la mise à niveau de l'abattoir de Manga BF-PST2-92386-CS-INDV / Plans d'Action de Réinstallation des personnes Component B: Urban Individual affectées par les constructions IDA / 58590 Infrastructure in Targeted Post Consultant Open 50,000.00 49,562.70 Signed 2018-12-21 2018-05-25 2019-02-19 2019-02-18 2019-03-21 2019-03-04 2019-05-04 2019-06-10 2019-07-03 de voiries et de caniveaux à Regional Capitals Selection Tenkodogo, Koudougou et Ouahigouya BF-PST2-92387-CS-INDV / Plans d'Action de Réinstallation des personnes affectées par la construction Component B: Urban Individual de la gare routière et du IDA / 58590 Infrastructure in Targeted Post Consultant Open 50,000.00 68,580.80 Signed 2018-12-21 2018-05-25 2019-02-19 2019-02-18 2019-03-21 2019-03-27 2019-05-04 2019-05-28 2019-07-03 marché de bétail de Manga et Regional Capitals Selection la construction du marché du secteur 6 et de la gare routière de Dédougu BF-PST2-92388-CS-INDV / Plans d'Action de Réinstallation des personnes Component B: Urban Individual affectées par le maraichage et IDA / 58590 Infrastructure in Targeted Post Consultant Open 50,000.00 33,150.00 Signed 2018-12-21 2018-05-25 2019-02-19 2019-02-18 2019-03-21 2019-03-27 2019-05-04 2020-03-24 2019-07-03 la construction du village Regional Capitals Selection artisanal de Ouahigouya et le maraichage ainsi que la mise à niveau de l'abattoir de Manga BF-PST2-66980-CS-INDV / PAR des personnes affectées Component B: Urban Individual par les activités du volet IDA / 58590 Infrastructure in Targeted Post Consultant Open 150,000.00 0.00 Canceled 2018-07-02 2018-10-08 2018-09-20 2018-10-25 2018-12-23 2019-03-23 urbain du PTDIU à Manga, Regional Capitals Selection Tenkodogo, Koudougou, Dédougou et à Ouahigouya BF-PST2-66969-CS-INDV / Notices d'impact environnemental et social Component B: Urban Individual (NIES) pour les activités du IDA / 58590 Infrastructure in Targeted Post Consultant Open 150,000.00 0.00 Canceled 2018-07-10 2018-10-08 2018-09-08 2018-10-08 2018-11-21 2019-02-19 volet urbain du PTDIU à Regional Capitals Selection Manga, Tenkodogo, Koudougou, Dédougou et à Ouahigouya BF-PST2-104703-CS-INDV / Individual Component D: Project Under recrutement du IDA / 58590 Post Consultant Limited 164,000.00 0.00 2019-03-06 2019-04-17 2019-03-11 2018-09-21 2019-04-01 2019-04-11 2019-05-06 2022-05-05 Management Implementation Coordonnateur du SP-PST Selection BF-PST2-104761-CS-INDV / formation du personnel et Individual Component D: Project l'élaboration d'une IDA / 58590 Post Consultant Limited 27,272.00 0.00 Under Review 2019-04-16 2019-06-10 2019-04-21 2019-05-12 2019-07-05 2019-09-03 Management cartographie des risques au Selection SP-PST BF-PST2-115699-CS-INDV / Component C: Institutional Individual Etude d'impact social pour la IDA / 58590 Support and Sector Post Consultant Open 272,727.00 275,025.84 Signed 2019-05-31 2019-07-08 2019-07-30 2019-08-30 2019-08-29 2019-09-20 2019-10-27 2019-11-18 2019-12-26 délimitation du zonage des Governance Selection SDAU Component C: Institutional Individual BF-PST2-115703-CS-INDV / IDA / 58590 Support and Sector Post Consultant Limited 54,545.00 47,507.62 Signed 2019-05-20 2019-03-25 2019-05-25 2018-11-19 2019-06-15 2019-07-20 2019-07-05 2021-07-19 Assistance technique au MUH Governance Selection BF-PST2-125932-CS-INDV / Individual Component D: Project Revue à mi-parcours du IDA / 58590 Post Consultant Limited 50,000.00 37,172.03 Signed 2019-08-02 2019-09-02 2019-08-07 2019-12-16 2019-08-17 2019-12-24 2019-08-29 2020-01-07 2019-10-03 Management PTDIU Selection BF-PST2-125936-CS-INDV / Recrutement d’un Consultant chargé de la formation en Component B: Urban Individual passation des marchés des IDA / 58590 Infrastructure in Targeted Post Consultant Limited 27,272.00 7,870.27 Completed 2019-08-26 2019-09-05 2019-08-31 2019-12-10 2019-09-15 2020-01-08 2019-10-07 2020-01-17 2019-10-17 2020-03-12 agents des marchés publics Regional Capitals Selection de Agetib, ACOMOD et DMP/MUH BF-PST2-126473-CS-INDV / Individual Component D: Project recrutement d'un spécialiste IDA / 58590 Post Consultant Open 24,000.00 33,610.82 Signed 2019-08-26 2019-06-25 2019-10-14 2020-04-07 2019-11-04 2019-12-09 2020-05-22 2020-12-08 Management en sauvegarde sociale Selection BF-PST2-143199-CS-INDV / Mise en place et Component C: Institutional Individual opérationnalisation d'un IDA / 58590 Support and Sector Post Consultant Limited 136,363.00 95,423.34 Signed 2019-10-29 2019-09-11 2019-11-03 2020-02-25 2019-11-24 2020-04-08 2019-12-29 2020-05-13 2020-06-26 dispositif national de suivi des Governance Selection prix de transports des marchandises Page 9 BF-PST2-144594-CS-INDV / Recrutement d'un consultant individuel pour l'élaboration Component C: Institutional Individual de la stratégie, la conception IDA / 58590 Support and Sector Post Consultant Limited 5,000.00 5,146.85 Signed 2019-11-15 2020-08-18 2019-11-20 2020-08-28 2019-12-11 2020-09-08 2020-01-15 2020-09-25 2020-02-14 de la campagne de Governance Selection communication de la Mairie de Ouagadougou BF-PST2-144389-CS-INDV / Individual Component D: Project Under Recrutement d'un spécialiste IDA / 58590 Post Consultant Open 22,000.00 0.00 2019-12-30 2020-04-15 2020-02-17 2020-03-09 2020-04-13 2020-05-19 Management Implementation en suivi-évaluation Selection BF-PST2-147504-CS-INDV / Réalisation d’un Cadre de Component C: Institutional Individual Gestion Environnementale et IDA / 58590 Support and Sector Post Consultant Limited 55,000.00 48,662.32 Signed 2020-01-06 2019-10-23 2020-01-11 2020-01-28 2020-02-01 2020-02-06 2020-03-07 2020-04-15 2020-05-06 sociale du Projet de Governance Selection Transport Public de Ouaga (optis) BF-PST2-147505-CS-INDV / Réalisation d’un Cadre de Component C: Institutional Individual Politique de Réinstallation du IDA / 58590 Support and Sector Post Consultant Limited 55,000.00 49,397.49 Signed 2020-01-07 2019-10-23 2020-01-12 2020-01-28 2020-02-02 2020-02-06 2020-03-08 2020-04-15 2020-05-07 Projet de Transport Public de Governance Selection Ouagadougou (optis) BF-PST2-147508-CS-INDV / Cadre de Politique de Component C: Institutional Individual Réinstallation (CPR) du Projet IDA / 58590 Support and Sector Post Consultant Limited 55,000.00 49,182.72 Signed 2019-12-27 2019-11-30 2020-01-01 2020-02-04 2020-01-22 2020-02-26 2020-04-21 2020-03-27 Intégré de Connectivité et de Governance Selection Mobilité BF-PST2-147509-CS-INDV / Cadre de Gestion Component C: Institutional Individual Environnementale et sociale IDA / 58590 Support and Sector Post Consultant Limited 55,000.00 49,149.68 Signed 2020-01-07 2019-12-16 2020-01-12 2019-12-27 2020-02-02 2020-02-06 2020-03-08 2020-04-21 2020-04-07 du Projet Intégré de Governance Selection Connectivité et de Mobilité BF-PST2-159951-CS-INDV / formation des acteurs impliqués dans la chaîne de Component B: Urban Individual passation des marchés du IDA / 58590 Infrastructure in Targeted Post Consultant Limited 80,000.00 0.00 Canceled 2020-04-30 2020-06-19 2020-05-05 2020-05-26 2020-06-30 2020-07-14 PTDIU sur le règlement de Regional Capitals Selection passation de la Banque Mondiale de juillet 2016 révisé BF-PST2-125935-CS-INDV / Recrutement d’un Consultant chargé de la formation des Individual acteurs du PTDIU à la Component D: Project IDA / 58590 Post Consultant Limited 27,272.00 0.00 Canceled 2019-08-13 2019-08-18 2019-09-02 2019-09-24 2019-10-04 maitrise des procédures Management Selection environnementales et sociales nationales et de la Banque mondiale BF-PST2-161538-CS-INDV / Recrutement d’un consultant Individual pour la formation du Component D: Project Under IDA / 58590 Post Consultant Limited 45,454.00 0.00 2020-06-24 2020-08-20 2020-06-29 2020-07-20 2020-09-12 2020-11-11 personnel et l’élaboration Management Implementation Selection d’une cartographie des risques au SP-PST BF-PST2-162320-CS-INDV / Individual Component D: Project Elaboration d'un manuel IDA / 58590 Post Consultant Limited 27,272.00 0.00 Canceled 2020-04-30 2020-10-28 2020-05-05 2020-05-26 2020-06-30 2020-07-30 Management d’audit interne Selection BF-PST2-162311-CS-CDS / Recrutement d’un consultant pour des études de faisabilité Component C: Institutional pour la contractualisation IDA / 58590 Support and Sector Post Direct Selection Direct 450,000.00 0.00 Canceled 2020-04-14 2020-04-24 2020-06-28 2020-12-25 pluriannuelle de l’entretien Governance routier avec obligation de résultats au Burkina Faso BF-PST2-156892-CS-INDV / Individual Component D: Project Recrutement d'un spécialiste IDA / 58590 Post Consultant Open 28,000.00 0.00 Canceled 2020-04-30 2020-12-08 2020-06-18 2020-07-09 2020-08-13 2021-02-09 Management en TIC au profit du SP-PST Selection BF-PST2-162304-CS-INDV / Recrutement d'un consultant pour appuyer les structures à Individual l'élaboration de la Stratégie de Component D: Project IDA / 58590 Post Consultant Limited 30,000.00 0.00 Canceled 2020-04-30 2020-05-05 2020-05-05 2020-06-12 2020-05-26 2020-06-30 2020-07-30 Passation des Marchés du Management Selection PTDIU et le Projet Connectivité selon le nouveau règlement de passation des marchés BF-PST2-184953-CS-INDV / Individual Component A: Inter-urban Under Audit technique des travaux IDA / 58590 Post Consultant Limited 55,000.00 0.00 2020-08-10 2021-03-02 2020-08-15 2020-09-05 2020-10-10 2020-11-24 Infrastructure Implementation Manga Zabré Selection BF-PST2-184956-CS-INDV / Individual Component A: Inter-urban Under Audit environnementale des IDA / 58590 Post Consultant Limited 55,000.00 0.00 2020-08-18 2020-08-20 2020-08-23 2021-03-12 2020-09-13 2021-05-24 2020-10-18 2020-12-02 Infrastructure Implementation travaux de Manga Zabre Selection BF-PST2-198428-CS-INDV / Individual recrutement du Spécialiste en Component D: Project Under IDA / 58590 Post Consultant Limited 43,636.00 0.00 2020-10-30 2020-12-01 2020-11-04 2020-11-25 2021-01-13 2022-01-13 Gestion Financière Management Implementation Selection (Administrateur Gestionnaire) BF-PST2-221013-CS-INDV / Individual Recrutement d'un Component D: Project Under IDA / 58590 Post Consultant Open 15,272.00 0.00 2021-03-15 2021-04-30 2021-05-03 2021-05-24 2021-06-28 2021-12-25 informaticien au profit du SP- Management Implementation Selection PST BF-PST2-222749-CS-INDV / Recrutement de deux superviseurs à pied d’œuvre Component B: Urban Individual Under pour appuyer l’Agetib dans la IDA / 58590 Infrastructure in Targeted Post Consultant Limited 15,272.00 0.00 2021-03-12 2021-04-30 2021-03-17 2021-05-25 2021-03-31 2021-05-05 2021-09-02 Implementation supervision des travaux de Regional Capitals Selection voiries dans la ville de Ouahigouya et Koudougou Page 10 BF-PST2-229495-CS-INDV / Recrutement d’un consultant pour l’Assistance Technique Individual Component D: Project Under au SP/PST pour le suivi des IDA / 58590 Post Consultant Limited 72,727.00 0.00 2021-05-07 2021-04-30 2021-05-12 2021-06-02 2021-06-28 2021-12-25 Management Implementation travaux de construction Selection d’équipements structurants dans le cadre du PTDIU BF-PST2-229497-CS-INDV / Individual Component A: Inter-urban Actualisation PAR de IDA / 58590 Post Consultant Limited 54,545.00 0.00 Under Review 2021-05-10 2021-06-15 2021-05-15 2021-06-05 2021-07-10 2021-08-24 Infrastructure Dindéogo Zabré Selection BF-PST2-229499-CS-INDV / Individual Component A: Inter-urban Actualisation NIES de IDA / 58590 Post Consultant Limited 54,545.00 0.00 Under Review 2021-05-11 2021-05-07 2021-05-16 2021-06-06 2021-07-11 2021-08-25 Infrastructure Dindéogo Zabré Selection BF-PST2-231274-CS-INDV / Plans d’Action de Individual Réinstallation des personnes Component A: Inter-urban Pending IDA / 58590 Post Consultant Limited 72,727.00 0.00 2021-05-15 2021-05-20 2021-06-10 2021-07-15 2021-08-14 affectées par les travaux de Infrastructure Implementation Selection Zabré – Zoaga – Frontière du Ghana BF-PST2-231275-CS-INDV / Etude d'impact Individual Component A: Inter-urban Under environnementale des travaux IDA / 58590 Post Consultant Limited 72,727.00 0.00 2021-05-17 2021-05-18 2021-05-22 2021-06-12 2021-07-17 2021-08-16 Infrastructure Implementation de Zabré – Zoaga – Frontière Selection du Ghana BF-PST2-234230-CS-INDV / Individual Enquête de satisfaction des Component D: Project Pending IDA / 58590 Post Consultant Limited 81,818.00 0.00 2021-06-25 2021-07-16 2021-08-06 2021-09-17 2021-11-06 bénéficiaires des Management Implementation Selection investissements du PTDIU BF-PST2-234233-CS-INDV / Individual Audit environnemental des Component D: Project Pending IDA / 58590 Post Consultant Limited 63,636.00 0.00 2021-07-21 2021-08-11 2021-09-10 2021-10-22 2021-11-21 équipements structurants et Management Implementation Selection des voiries BF-PST2-234236-CS-INDV / Individual Component D: Project Pending Audit social des équipements IDA / 58590 Post Consultant Limited 63,636.00 0.00 2021-07-14 2021-08-04 2021-09-03 2021-10-15 2021-11-14 Management Implementation structurants et des voiries Selection BF-PST2-234237-CS-INDV / Individual Component D: Project Pending Audit technique des travaux IDA / 58590 Post Consultant Limited 54,545.00 0.00 2021-07-07 2021-07-28 2021-09-01 2021-10-16 2021-11-15 Management Implementation des équipements structurants Selection BF-PST2-234240-CS-INDV / Individual Component D: Project Pending Audit technique des travaux IDA / 58590 Post Consultant Limited 54,545.00 0.00 2021-06-30 2021-07-21 2021-08-25 2021-10-09 2021-11-08 Management Implementation des voiries Selection BF-PST2-234242-CS-INDV / Individual Component D: Project Pending Elaboration du rapport IDA / 58590 Post Consultant Limited 72,727.00 0.00 2021-07-21 2021-08-11 2021-09-15 2021-10-30 2021-12-09 Management Implementation d'achèvement du PTDIU Selection Page 11 PROCUREMENT PLAN (Project Preparation Advance- PPA) I. General Project information: Ghana, Africa Environment Health And Pollution Management Program (P167788) Project Implementation agency: Environmental Protection Agency (EPA) Date of the Procurement Plan: June , 2020 Period covered by this Procurement Plan: September 2020 to March 2022 (PPA Period) Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: When approaching the national market (as specified in the Procurement Plan tables in STEP), Bank’s Procurement Regulations will be followed. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None Recommendations from the Procurement Assessment of EPA (Finalized in March 2019) As part of the preparation of the Project Preparation Advance (PPA), the following recommendations were made as a result of the procurement assessment of EPA, carried out by the World Bank: a. The EPA to provide adequate incentives to attract and maintain the existing procurement staff and to ensure effective coordination of procurement activities by the multiple implementing agencies. b. The World Bank to organize and deliver training session for the procurement staff on the Procurement Framework during the appraisal and immediately after, for effectiveness, with hands-on support to ensure proper and effective application of the Bank’s regulations. c. Intensify training in Procurement and Contract Management by the Bank. d. Supplement the efforts of the procurement staff by hiring a procurement consultant to support them, if the need arises. e. Use World Bank standard procurement documents found on the website- www.worldbank.org/procurement for all procurements with the appropriate modification acceptable by the World Bank; f. Prepare a simple Procurement Manual (or a part of a Public Investment Management- PIM) in line with the World Bank Procurement Regulation to guide procurement implementation. g. The Procurement staff should attend the World Bank monthly procurement clinic, while building the capacity of the entire organization on World Bank procurement procedures. II. Goods and Works and non-consulting services. Thresholds for Prior Review, Procurement Approaches and Methods – Goods, Works, Non- Consulting Services and Consulting Services Procurement Method and Prior Review Thresholds Thresholds Effective1January2017 Prior ReviewThreshold in (US$'000) ProcurementMethods Thresholds (inUS$'000) Shortlist of Nationa l Consultants Works Goods, ITand non-consulting services Consulta nts Single Engine e ring Goods, IT Source& Reque st for Reque st for Ope n O pen Ope n O pen & Systems+ Direct Q uota tion/ Q uota tion/ Consulting RISK RATING Works Firms Individuals Inte rna tiona National or Inte rna tiona National or constructio Non Con. Contract N ationa l Nationa l services l or ICB N CB l or ICB N CB n Serv Shopping Shopping supe rvision HIGH ≥$5,000 ≥$1,500 ≥$500 ≥$200 ≥$100 ≥15000 <15000 ≤200 ≥3000 <3000 ≤100 <300 ≤500 Post Review: All contracts not subject to prior review shall be subject to post review. Procurement Method and Prior Review Thresholds a. Summary of the procurement packages for Good, Works and Non-Consulting Services Sr. Contract Estimat Revi Market Selecti Evaluation Procurem Prequ Domesti Expecte Expecte No Description ed Cost ew Approa on Options ent alifica c d date d date of (US$) by ch Metho (Most Process tion Prefere of bid/ Contract Bank (Open- d Advantage (Single (Yes/ nce proposa Signatur (Prio Nationa (RFP, ous Bid, stage- No) (Yes/No l e r/ l/ RFB, BAFO, single ) opening Post) Limited RFQ, Rated envelope etc.) DS Criteria etc.) etc.) etc.) WORKS 1 Establishment of Post Open- RFB Least Cost, Single Yes No 24/06/20 28/08/202 Up-to Five (5) National Rated stage- 21 1 Clean Mining Criteria single Demonstration envelope Centers in the Middle Sector of 1,000,00 Ghana 0 Build and Post Open- RFB Least Cost, Single Yes No 20/07/20 29/09/202 Establish at least National Rated Stage- 21 1 1 and up-to 2 Criteria Single National Buy- Envelope back/Holding 1,000,00 Centers for E- 0 waste Build and Post Open- RFB Least Cost, Single Yes No 20/07/20 23/09/202 Establish E-waste National Rated Stage- 21 1 Collection and Criteria Single Dismantling Envelope Centers in at least 5 to 10 Selected E-waste 900,000 Hotspots Outside Accra Establishment of Post Open- RFB Least Cost, Single Yes No 24/06/20 28/08/202 (up to) 5 Clean National Rated Stage- 21 1 Mining Criteria Single Demonstration Envelope Centers in the Northern and Southern Sectors 1,000,00 of Ghana 0 Total Works 3,900,0 00 GOODS Supply of 2No. Post Open- RFB Least Cost, Single No No 03/11/20 07/01/202 Cross Country National Rated Stage- 20 1 (4x4) SUV 200,000 Criteria Single Station Wagon Envelope Supply of Office Post Open- RFQ Least Cost, Single No No 26/09/20 07/11/202 Equipment and National Rated Stage- 20 0 Furniture Criteria Single (2 Sets of Envelop Desktop Computers with UPS devices; 10 sets of Laptop Computers; 2 MFP Printers; 4 Sets of Office desk and swivel Chair; 1 LCD Projector with 60,000 mobile screen; Pull-ups screens; Office Stationery Total Goods 260,000 b. Threshold Prior Review, Selection Approaches and Methods – Consulting Services - Refer to threshold table above. Note: Consultancy services estimated to cost equivalent to US $ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or regional newspaper. Summary of the procurement packages for Consulting Services: Sr. Contract Description Estimat Revie Market Selection Shortlist Expected Expected No ed Cost w by Approach Method ing date of date of (US$) Bank (Open - (QCBS, (Yes/ No) bid/ Contract (Prior/ Internation FBS, LCBS, proposal Signature Post) al/ QBS, CQS, opening National/ DS etc.) etc.) 1 Project Communication and Open 35,000 Prior INDV No 29/10/2020 24/12/2020 Reporting Specialist National 2 Open 40,000 Prior INDV No Recruiting Procurement National 20/10/2020 15/12/2020 Specialist 3 Design and supervision of (at least) 1 and, up-to 2 National Open 200,000 Prior FIRM/QCBS No 08/05/2021 Buy-Back & Holding Centers for National 16/01/2021 E-waste 4 Consultancy Service for the Open Compilation of a National E- 200,000 Prior FIRM/CQS No 16/01/2021 26/04/2021 International waste Inventory (NEI) for Ghana 5 Consultancy Service for the Preparation of Technology Open 450,000 Prior FIRM/QCBS No 21/01/2021 01/05/2021 Roadmaps on Artisanal Small International Scale Mining (ASGM) in Ghana 6 Design and Supervision of the Construction of (up to) Ten (10) Open Clean Mining Demonstration 200,000 Prior FIRM/QCBS No 28/01/2021 08/5/2021 National Centers in the Northern, Middle and Southern Sectors of Ghana 7 Consultancy Service to Assess National Institutional Policies and Legislative Gaps in Mercury Open Management and Develop 150,000 Post FIRM/CQS No 01/12/2020 20/03/2021 International Consolidated Legal Framework to Meet all Requirements of the Minamata Convention in Ghana Consultancy Service for the Preparation of Outreach and Open 120,000 Post Firm/CQS No 10/11/2020 27/02/2021 Communication Strategy on National Mercury Management in Ghana Training of Environmental Protection Agency (EPA) and MESTI staff as well as officers Open from the Customs Division of 80,000 Post Firm/CQS No 01/12/2020 20/03/2021 National the Ghana Revenue Authority (GRA) on E-waste Management and E-waste Fund Consultancy Service to Conduct Open an Economic Assessment of 100,000 Post Firm/CQS No 03/12/2020 22/03/2021 International Plastics in E-waste in Ghana Consultancy Service for the Development Interim Standards Open for Mercury Management Along 150,000 Post Firm/CQS No 16/11/2020 05/03/2021 National the Mercury Value-Chain in Ghana Technical Assistance to E-waste Associations/Co-operatives on Open 100,000 Post Firm/CQS No 03/12/2020 22/03/2021 Safe Handling and Recycling of National E-waste and Development Consulting Services for the Compilation of a National Open 150,000 Post Firm/CQS No 04/11/2020 21/02/2021 Mercury Inventory (NMI) for International Ghana Consulting Service to Assess Open the Economics of the Eco-Levy 100,000 Post Firm/CQS No 10/11/2020 27/02/2021 National in Ghana Awareness Raising on Health Impacts of Mercury Open 80,000 Post Firm/CQS No 27/10/2020 13/02/2021 Management and Solutions in National Mining Communities Production of a Standard Design and Supervision for the Construction of Collection and Open 200,000 Post Firm/CQS No 05/11/2020 22/02/2021 Dismantling Centers in at least National 5 to 10 E-waste Hotspots Outside Accra Technical Assistance to Interested Private Operators Open and Scrap Dealers in the E- 100,000 Post Firm/CQS No 17/11/2020 06/03/2021 National waste Industry on Bidding and Operating Centers in Ghana Consultancy Service for the Open 200,000 Post Firm/CQS No 14/12/2020 02/04/2021 Development of International Implementation Plan for the E- waste Policy of Ghana Consulting Service for the Assessment of Access to Finance for Artisanal and Small Open 100,000 Post Firm/CQS No 02/12/2020 21/03/2021 Scale Miners (ASGM) and National Preparation of Financial Roadmaps for ASGM Media Training on Health Risks and Positive Development and Open 80,000 Post Firm/CQS No 10/11/2020 27/02/2021 Successful Pilots in Addressing National Mercury Management in ASGM Outreach to Local Governments and Non-Governmental Open Organizations and Consultants 80,000 Post Firm/CQS No 24/11/2020 13/03/2021 National in Charge of Investment in ASGM Updating of University of Mines and Technology Courses to Limited 60,000 Post Firm/CQS No 12/11/2020 16/01/2021 include New Innovations and National Technologies in Mining Total Consultancy Services 2,975,0 00 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) Above US$ 1,500,000 All 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million All 5. Consultancy Services (Firms) Above US$ 500,000 All 6. Consultancy Services Above US$ 200,000 All (Individual) 2. Prequalification. Bidders for Works shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by Not Yet 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] - Not Applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comments No. on ed stic by Bank Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 1.25 6 No Prior 2 Contracts for of the IC Prior Review (Consultan cy) and 4 for Post Summary 1.725 16 No Post 6 Contracts for of the NC Prior Review (Consultan and 10 for Post cy) Summary 3.9 4 No Post of the NCB (Works) Summary 0.2 1 No Post of the NCB (Goods) Summary 0.06 1 No Post of the RFQ (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignment Cost (Prior / US$ Post) million Summary of 0.85 3 Prior number of contracts that will be let under QCBS Summary of 2.05 17 Post CQS (1 number of Prior contracts Review) that will be let under other methods Summary of 0.75 2 Prior number of contracts that will be let under INDIVIDUAL PROCUREMENT Western Africa : Africa Environmental Health and Pollution Management Program PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2020-06-16 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167788 GPN Date: 2021-02-10 Project Name: Africa Environmental Health and Pollution Management Program Loan / Credit No: / , TF / B3246, TF / B3321 A Executing Agency(ies): frica Environmental Health and Pollution Management Program - GHANA WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GH-EHPMP-171044-CW-RFB / Establishment of (up to) 5 Demonstrating Application of Pending Single Stage - One 2023-11- Clean Mining Demonstration TF / B3321 Technological Tools and Post Request for Bids Open - National 1,000,489.26 0.00 Implementat 2021-11-02 2022-01-18 2022-01-18 2021-11-07 2022-03-29 2022-04-28 2022-06-02 Envelope 24 Centers in the Northern and Economic Approaches ion Southern Sectors of Ghana GH-EHPMP-171045-CW-RFB / Establishment of Up-to Five Demonstrating Application of Pending Single Stage - One 2023-08- (5) Clean Mining TF / B3321 Technological Tools and Post Request for Bids Open - National 1,000,519.47 0.00 Implementat 2021-12-07 2022-02-22 2022-02-22 2021-12-12 2022-05-03 2022-06-02 2022-07-07 Envelope 01 Demonstration Centers in the Economic Approaches ion Middle Sector of Ghana GH-EHPMP-171046-CW-RFB / Build and Establish E-waste Demonstrating Application of Pending Collection and Dismantling Single Stage - One 2023-11- TF / B3321 Technological Tools and Post Request for Bids Open - National 900,015.53 0.00 Implementat 2021-10-26 2022-01-11 2022-01-11 2021-10-31 2022-03-22 2022-04-21 2022-05-26 Centers in at least 5 to 10 Envelope 17 Economic Approaches ion Selected E-waste Hotspots Outside Accra GH-EHPMP-171047-CW-RFB / Build and Establish at least 1 Demonstrating Application of Pending Single Stage - One 2023-07- and up-to 2 National Buy- TF / B3321 Technological Tools and Post Request for Bids Open - National 998,702.96 0.00 Implementat 2021-12-07 2022-02-22 2022-02-22 2021-12-12 2022-05-03 2022-06-02 2022-07-07 Envelope 07 back/Holding Centers for E- Economic Approaches ion waste GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-EHPMP-171048-GO-RFQ / Supply of Office Equipment and Furniture (2 Sets of Desktop Computers with UPS devices; 10 sets of Under Program Implementation and Request for Single Stage - One Laptop Computers; 2 MFP TF / B3321 Post Open - National 60,000.00 0.00 Implementati 2021-03-20 2021-05-20 2021-06-03 Coordination Quotations Envelope Printers; 4 Sets of Office desk on and swivel Chair; 1 LCD Projector with mobile screen; Pull-ups screens; Office Stationery GH-EHPMP-171049-GO-RFB / Supply of 2No. Cross Institutional Strengthening, Single Stage - One Country (4x4) SUV Station TF / B3321 Knowledge and Capacity Post Request for Bids Open - National 200,000.00 0.00 Canceled 2021-03-23 2021-04-07 2021-03-28 2021-05-09 2021-05-05 2021-06-08 2021-05-21 2021-07-13 2021-09-11 Envelope Wagon and 1No. Pick-Up Building vehicles GH-EHPMP-234079-GO-RFQ / Supply and installation of 8No. laptop and 2No. Desktop Under Program Implementation and Request for Single Stage - One Computers, LCD Projector, TF / B3321 Post Limited 38,000.00 0.00 Implementati 2021-05-22 2021-05-14 2021-07-10 2021-07-24 Coordination Quotations Envelope 4No. Printers and other on computers accessories/IT equipment GH-EHPMP-234189-GO-RFQ / Supply and installation of Under Program Implementation and Request for Single Stage - One Office Furniture and TF / B3321 Post Limited 15,000.00 0.00 Implementati 2021-05-29 2021-05-14 2021-07-10 2021-07-24 Coordination Quotations Envelope Furnishing Equipment at the on PIU GH-EHPMP-234256-GO-RFQ Under Program Implementation and Request for Single Stage - One / Supply of Office Stationery TF / B3321 Post Limited 7,000.00 0.00 Implementati 2021-05-29 2021-05-14 2021-07-10 2021-07-24 Coordination Quotations Envelope for PIU on GH-EHPMP-237730-GO-RFQ Under / Procurement of 1No. 4x4 Program Implementation and Request for Single Stage - One TF / B3321 Post Limited 200,000.00 0.00 Implementati 2021-06-12 2021-06-03 2021-08-07 2021-08-28 Double Cabin Pick-up and Coordination Quotations Envelope on 2No. SUV vehicles NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-EHPMP-170162-CS-CQS / Consultancy Service for the Institutional Strengthening, Consultant Under Preparation of Outreach and / Knowledge and Capacity Post Qualification Open - National 120,000.00 0.00 2020-10-20 2021-01-07 2020-11-10 2021-01-15 2020-12-24 2021-05-10 2021-01-23 2021-02-27 2021-08-26 Implementation Communication Strategy on Building Selection Mercury Management in Ghana Page 1 GH-EHPMP-170201-CS- QCBS / Consultancy Service Institutional Strengthening, for the Preparation of Quality And Cost- Under / Knowledge and Capacity Prior Open - International 200,000.00 0.00 2020-11-05 2021-01-08 2020-11-26 2021-01-22 2021-01-09 2021-05-21 2021-02-06 2021-03-08 2021-04-12 2021-05-17 2022-05-17 Outreach and Communication Based Selection Implementation Building Strategy and Campaigns on E- waste and E-waste Fund GH-EHPMP-170200-CS-CQS / Consultancy Service for the Institutional Strengthening, Quality And Cost- Pending Compilation of a National E- TF / B3321 Knowledge and Capacity Post Open - International 200,000.00 0.00 2021-03-15 2021-04-05 2021-05-10 2021-06-02 2021-06-23 2021-07-28 2021-08-12 2022-08-12 Based Selection Implementation waste Inventory (NEI) for Building Ghana GH-EHPMP-169688-CS-CQS / Consulting Services for the Institutional Strengthening, Consultant Pending Compilation of a National TF / B3321 Knowledge and Capacity Post Qualification Open - International 150,000.00 0.00 2021-04-15 2021-05-06 2021-06-19 2021-07-19 2021-08-23 2022-08-23 Implementation Mercury Inventory (NMI) for Building Selection Ghana GH-EHPMP-170428-CS-CQS / Consultancy Service for the Policy Dialogue and Quality And Cost- Pending Preparation of Technology TF / B3321 Post Open - International 450,000.00 0.00 2021-04-12 2021-05-03 2021-06-16 2021-07-14 2021-08-13 2021-09-17 2021-10-22 2022-10-22 Regulatory Enhancements Based Selection Implementation Roadmaps on Artisanal Small Scale Mining (ASGM) in Ghana GH-EHPMP-171039-CS-CQS / Design and Supervision of the Construction of (up to) Demonstrating Application of Quality And Cost- Pending Ten (10) Clean Mining TF / B3321 Technological Tools and Post Open - National 200,000.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-02 2021-08-01 2021-09-05 2021-10-10 2022-10-10 Based Selection Implementation Demonstration Centers in the Economic Approaches Northern, Middle and Southern Sectors of Ghana GH-EHPMP-171040-CS-CQS / Production of a Standard Design and Supervision for Demonstrating Application of Consultant Pending the Construction of Collection TF / B3321 Technological Tools and Post Qualification Open - National 200,000.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2023-08-08 Implementation and Dismantling Centers in at Economic Approaches Selection least 5 to 10 E-waste Hotspots Outside Accra GH-EHPMP-171042-CS- QCBS / Design and Demonstrating Application of Quality And Cost- Pending supervision of (at least) 1 and, TF / B3321 Technological Tools and Post Open - National 200,000.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-02 2021-08-01 2021-09-05 2021-10-10 2023-12-18 Based Selection Implementation up-to 2 National Buy-Back & Economic Approaches Holding Centers for E-waste GH-EHPMP-170703-CS-CQS / Consultancy Service for the Consultant Policy Dialogue and Pending Development of TF / B3321 Post Qualification Open - National 200,000.00 0.00 2021-07-22 2021-08-12 2021-09-25 2021-10-25 2021-11-29 2022-05-28 Regulatory Enhancements Implementation Implementation Plan for the E- Selection waste Policy of Ghana GH-EHPMP-170389-CS-CQS / Training of Environmental Protection Agency (EPA) and Institutional Strengthening, Consultant MESTI staff as well as officers Pending TF / B3321 Knowledge and Capacity Post Qualification Open - National 80,000.00 0.00 2021-05-07 2021-05-28 2021-07-11 2021-08-10 2021-09-14 2023-09-04 from the Customs Division of Implementation Building Selection the Ghana Revenue Authority (GRA) on E-waste Managemnt and E-waste Fund GH-EHPMP-170348-CS-CQS / Technical Assistance to E- Institutional Strengthening, Consultant waste Associations/Co- Pending TF / B3321 Knowledge and Capacity Post Qualification Open - National 100,000.00 0.00 2021-04-20 2021-05-11 2021-06-24 2021-07-24 2021-08-28 2022-02-24 operatives on Safe Handling Implementation Building Selection and Recycling of E-waste and Development GH-EHPMP-171038-CS-CQS Consultant / Consulting Service to Assess Policy Dialogue and Pending TF / B3321 Post Qualification Open - National 100,000.00 0.00 2021-11-30 2021-12-21 2022-02-03 2022-03-05 2022-04-09 2022-10-16 the Economics of the Eco- Regulatory Enhancements Implementation Selection Levy in Ghana GH-EHPMP-171167-CS-CQS / Outreach to Local Institutional Strengthening, Consultant Governments and Non- Pending TF / B3321 Knowledge and Capacity Post Qualification Open - National 80,000.00 0.00 2022-02-03 2022-02-24 2022-04-09 2022-05-09 2022-06-13 2024-09-20 Governmental Organizations Implementation Building Selection and Consultants in Charge of Investment in ASGM GH-EHPMP-171041-CS-CQS / Technical Assistance to Demonstrating Application of Consultant Interested Private Operators Pending TF / B3321 Technological Tools and Post Qualification Open - National 100,000.00 0.00 2023-01-19 2023-02-09 2023-03-25 2023-04-24 2023-05-29 2025-04-28 and Scrap Dealers in the E- Implementation Economic Approaches Selection waste Industry on Bidding and Operating Centers in Ghana GH-EHPMP-170197-CS-CQS / Media Training on Health Institutional Strengthening, Consultant Risks and Positive Pending TF / B3321 Knowledge and Capacity Post Qualification Open - National 80,000.00 0.00 2022-01-18 2022-02-08 2022-03-24 2022-04-23 2022-05-28 2024-07-16 Development and Successful Implementation Building Selection Pilots in Addressing Mercury Management in ASGM GH-EHPMP-171033-CS-CQS / Consultancy Service to Consultant Policy Dialogue and Pending Conduct an Economic TF / B3321 Post Qualification Open - International 100,000.00 0.00 2022-12-18 2023-01-08 2023-02-21 2023-03-23 2023-04-27 2024-02-20 Regulatory Enhancements Implementation Assessment of Plastics in E- Selection waste in Ghana GH-EHPMP-170700-CS-CQS / Consulting Service for the Assessment of Access to Consultant Policy Dialogue and Pending Finance for Artisanal and TF / B3321 Post Qualification Open - National 100,000.00 0.00 2021-12-15 2022-01-05 2022-02-18 2022-03-20 2022-04-24 2023-04-29 Regulatory Enhancements Implementation Small Scale Miners (ASGM) and Selection Preparation of Financial Roadmaps for ASGM GH-EHPMP-170424-CS-CQS / Consultancy Service for the Consultant Development Interim Policy Dialogue and Pending TF / B3321 Post Qualification Open - National 150,000.00 0.00 2023-11-07 2023-11-28 2024-01-11 2024-02-10 2024-03-16 2025-03-19 Standards for Mercury Regulatory Enhancements Implementation Selection Management Along the Mercury Value-Chain in Ghana Page 2 GH-EHPMP-170413-CS-CQS / Consultancy Service to Assess National Institutional Policies and Legislative Gaps Consultant Policy Dialogue and Pending in Mercury Management and TF / B3321 Post Qualification Open - International 150,000.00 0.00 2021-09-30 2021-10-21 2021-12-04 2022-01-03 2022-02-07 2022-11-04 Regulatory Enhancements Implementation Develop Consolidated Legal Selection Framework to Meet all Requirements of the Minamata Convention in Ghana GH-EHPMP-170199-CS-CQS / Updating of University of Institutional Strengthening, Consultant Mines and Technology Pending TF / B3321 Knowledge and Capacity Post Qualification Limited 60,000.00 0.00 2022-10-10 2022-10-24 2022-11-23 2022-12-28 2023-12-23 Courses to include New Implementation Building Selection Innovations and Technologies in Mining GH-EHPMP-170181-CS-CQS / Awareness Raising on Health Institutional Strengthening, Consultant Pending Impacts of Mercury TF / B3321 Knowledge and Capacity Post Qualification Open - National 80,000.00 0.00 2022-01-11 2022-02-01 2022-03-17 2022-04-16 2022-05-21 2024-10-27 Implementation Management and Solutions in Building Selection Mining Communities INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-EHPMP-171169-CS-CQS / Coordinator for the Africa Individual Program Implementation and Pending Environmental Health and / Post Consultant Limited 150,000.00 0.00 2020-09-01 2020-09-06 2020-09-27 2020-11-01 2023-11-01 Coordination Implementation Pollution Management Selection (AEHPM) Programme GH-EHPMP-177665-CS-INDV Individual Program Implementation and Pending / Recruitment of Financial / Post Consultant Limited 40,000.00 0.00 2020-09-01 2020-09-06 2020-09-27 2020-11-01 2021-11-01 Coordination Implementation Management Specialist Selection GH-EHPMP-177667-CS-INDV Individual Program Implementation and Pending / Procurement of Procurement / Post Consultant Open 40,000.00 0.00 2020-09-01 2020-10-20 2020-11-10 2020-12-15 2021-12-15 Coordination Implementation Specialist Selection GH-EHPMP-177668-CS-INDV Individual / Recruitment of Program Implementation and Pending / Post Consultant Open 35,000.00 0.00 2020-09-01 2020-10-20 2020-11-10 2020-12-15 2021-12-15 Environmental and Social Coordination Implementation Selection Specialist GH-EHPMP-177672-CS-INDV Individual Program Implementation and Pending / Project Communication and / Post Consultant Open 35,000.00 0.00 2020-09-10 2020-10-29 2020-11-19 2020-12-24 2021-06-22 Coordination Implementation Reporting Specialist Selection GH-EHPMP-196406-CS-INDV / Consultancy Service for the Program Implementation and TF / B3246 Prior Direct Selection Direct 9,500.00 14,035.20 Signed 2020-10-01 2020-10-16 2020-10-11 2020-11-20 2020-10-28 2020-12-09 2020-11-22 Preparation of Project Coordination Implementation Manual GH-EHPMP-238908-CS-CDS / Consulting service for the Demonstrating Application of preparation of project Vision Pending TF / B3321 Technological Tools and Post Direct Selection Direct 68,965.52 0.00 2021-06-17 2021-06-27 2021-07-26 2021-08-25 for the Establishment of Implementation Economic Approaches National Buy-back/Holding Centers GH-EHPMP-238913-CS-CDS / Consultancy Service for the Demonstrating Application of preparation of project Vision Pending TF / B3321 Technological Tools and Post Direct Selection Direct 50,000.00 0.00 2021-06-17 2021-06-27 2021-08-04 2021-09-03 for the Establishment of E- Implementation Economic Approaches waste Collection and Dismantling Centers GH-EHPMP-238919-CS-CDS / Consultancy Service for the Demonstrating Application of Pending preparation of project Vision TF / B3321 Technological Tools and Prior Direct Selection Direct 100.00 0.00 2021-06-17 2021-06-27 2021-08-04 2021-09-03 Implementation for the Establishment of Clean Economic Approaches Mining Demonstration Centers Page 3 PROCUREMENT PLAN (Textual Part) Project information: Khyber Pakhtunkhwa Irrigated Agriculture Improvement Project (P163474) Project Implementation agency: Directorate General of On-Farm Water Management Government of Khyber Pakhtunkhwa Date of the Procurement Plan: September 1, 2020 Period covered by this Procurement Plan: September 2020- June 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Procurement Rules 2004 Revised 2020, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 2) For national open competitive procurement, only the model procurement documents acceptable to the World Bank, shall be used. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) Access to procurement opportunities shall not be restricted to firms that have pre-registered and/or paid a registration fee. 6) No preference of any kind shall be given to national bidders in the bidding process. 7) Procurement methods that use two-envelope process and rated criteria shall be subject to Bank’s prior concurrence When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Pakistan : Khyber Pakhtunkhwa Irrigated-Agriculture Improvement Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2020-09-05 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163474 GPN Date: 2020-09-07 Project Name: Khyber Pakhtunkhwa Irrigated-Agriculture Improvement Project Loan / Credit No: IDA / 64560 D Executing Agency(ies): irectorate General of On-Farm Water Management Government of Khyber Pakhtunkhwa WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-DGOFWM-KP-231231-GO- Project Management and Request for Single Stage - One RFQ / Renovation of IDA / 64560 Post Open - National 10,715.00 9,707.15 Signed 2021-05-08 2021-07-03 2021-05-21 2021-12-30 Monitoring Quotations Envelope Directorate (PIU) PK-DGOFWM-KP-233768-GO- Pending Project Management and Request for Single Stage - One RFQ / Procurement of IDA / 64560 Post Open - National 21,428.00 0.00 Implementati 2021-06-06 2021-08-01 2022-01-28 Monitoring Quotations Envelope Furniture on Under PK-DGOFWM-KP-233767-GO- Project Management and Request for Single Stage - One IDA / 64560 Post Open - National 1,678,571.00 0.00 Implementati 2021-06-02 2021-07-28 2022-01-24 RFB / procurement of vehicles Monitoring Quotations Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-DGOFWM-KP-177909-CS- QCBS / Selection of Project Project Management and Quality And Cost- Under Supervision and IDA / 64560 Prior Open - National 5,214,285.00 0.00 2020-09-15 2020-09-09 2020-10-06 2021-03-19 2020-11-19 2020-12-17 2021-01-16 2021-02-20 2021-03-27 2025-12-31 Monitoring Based Selection Implementation Implementation Assistance Consultants PK-DGOFWM-KP-221723-CS- QCBS / Selection of Project Project Management and Quality And Cost- Pending IDA / 64560 Prior Open - International 1,071,429.00 0.00 2021-04-26 2021-05-17 2021-06-30 2021-07-28 2021-08-27 2021-10-01 2021-11-05 2025-06-30 Monitoring and Evaluation Monitoring Based Selection Implementation Consultant INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-DGOFWM-KP-190207-CS- Individual Project Management and Under INDV / Hiring of Procurement IDA / 64560 Post Consultant Open 92,571.00 0.00 2020-09-15 2020-10-22 2020-11-03 2020-11-24 2020-12-29 2025-12-31 Monitoring Implementation Specialist Selection PK-DGOFWM-KP-190219-CS- Individual Project Management and Under INDV / Hiring of M & E IDA / 64560 Post Consultant Open 92,571.00 0.00 2020-09-15 2020-10-22 2020-11-03 2021-06-03 2020-11-24 2021-06-03 2020-12-29 2025-12-31 Monitoring Implementation Specialist Selection PK-DGOFWM-KP-190224-CS- Individual Project Management and Under INDV / Hiring of Social and IDA / 64560 Post Consultant Open 92,571.00 0.00 2020-09-15 2020-10-22 2020-11-03 2021-06-03 2020-11-24 2021-06-03 2020-12-29 2025-12-31 Monitoring Implementation Gender Specialist Selection PK-DGOFWM-KP-190331-CS- Individual Project Management and Under INDV / Hiring of IDA / 64560 Post Consultant Open 92,571.00 0.00 2020-09-15 2020-10-22 2020-11-03 2021-06-03 2020-11-24 2021-06-03 2020-12-29 2025-12-31 Monitoring Implementation Environmental specialist Selection PK-DGOFWM-KP-190936-CS- Individual Project Management and Under INDV / Hiring of IT & MIS IDA / 64560 Post Consultant Open 64,286.00 0.00 2020-09-15 2020-10-22 2020-11-03 2021-06-03 2020-11-24 2021-06-03 2020-12-29 2025-12-31 Monitoring Implementation Specialist Selection PK-DGOFWM-KP-201057-CS- Individual Project Management and Under INDV / Hiring of Agribusiness IDA / 64560 Post Consultant Open 92,571.00 0.00 2020-10-26 2020-10-28 2020-12-14 2021-06-08 2021-01-04 2021-06-08 2021-02-08 2022-02-08 Monitoring Implementation Specialist Selection Page 1 Appendix to Annex 3 Procurement Plan I. General 1. Project Information Country : India Borrower : Government of India Project Name : National Hydrology Project Loan Credit No. : 2. Bank’s Approval Date of the Procurement Plan : 3. Date of General Procurement Notice : 4. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services Thresholds for Method of Procurement for procurement of goods, works and non- consulting services Procurement of Goods, Information technology and non consultancy services: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 3 million Limited Competitive Bidding (LIB) Must meet the requirements as per Para 3.2 of the Procurement Guidelines, and with prior agreement in PP with the Bank National Competitive Bidding (NCB) > USD 100,000 and up to USD 3 million Shopping Up to USD 100,000 (INR 6.5 m) Direct Must meet the requirements as per Para 3.7 of the Procurement Guidelines, and with prior agreement in PP with the Bank Framework Agreement Must meet the requirements as per Para 3.6 of the Procurement Guidelines, and with prior agreement in PP with the Bank Procurement of Works: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 40 million National Competitive Bidding (NCB) > USD 100,000 and up to USD 40 million Comparison of three quotations / Up to USD 100,000 (INR 6.5 m) Shopping Force Account Must meet the requirements as per Para 3.9 of the Procurement Guidelines, and with prior agreement in PP with the Bank Prior Review Thresholds: The following would be subject to Prior review of the Bank regardless of the Method of selection: (a) Works: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 10 million (b) Goods: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 2 million; and The Prior Review Thresholds will be reviewed and updated during the implementation of the project, and modified based on the risk assessment. 1. In the case of contracts subject to prior review, Project Implementing Entity shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non-consulting services or consulting services, other significant changes to the terms and conditions of such that the contract,; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; or (d) the proposed termination of the contract.. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable Domestic Preference: The provision of domestic preference is applicable in the evaluation of Goods only. 3. Reference to Procurement Manual The procurement manual for the project is presently under preparation. SBDs agreed between the Project and Bank will be used for all works, goods, and non consultancy procurements. 4. Any Other Special Procurement Arrangements The National bidding method for procurement and goods and works according to the above value thresholds will be conducted in accordance with paragraphs 3.3 and 3.4 of the Bank’s Procurement Guidelines and the following provisions: (a) Only the model bidding documents for NCB agreed with the GOI task force (and as amended for time to time) shall be used for bidding. (b)Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids. (c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises, or enterprises from any given state. (d)Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer). (e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project. (f) Rate contracts entered into by the DGS&D will not be acceptable as a substitute for NCB procedures unless incorporation of right to audit and fraud corruption clauses. DGS&D contracts will be acceptable, however, for any procurement under the shopping procedures. (g)Two or three envelope system will not be used (except when using the e- procurement system assessed and agreed by the Bank). (h)No negotiations are conducted even with the lowest evaluated responsive bidders. 5. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Procurement methods of procurement of Consultants' Services (Firms) Method of Procurement Thresholds for Methods Quality and Cost Based Selection (QCBS) Quality Based Selection (QBS) Must meet the requirements as per Para 3..2 to 3.4 of the Consultant Guidelines Selection based on a Fixed Budget Must meet the requirements as per (FBS) Para 3.5 of the Consultant Guidelines, Selection Based on Least Cost Basis Must meet the requirements as per (LCS) Para 3.6 of the Consultant Guidelines, Selection based on Consultant’s Estimated not to exceed USD Qualification (CQ) 300,000, and must meet the requirements as per Para 3.7 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements as per Para 3.8 to 3.11 of the Consultant Guidelines, and with prior agreement in PP with the Bank. Procurement methods for Selection of Individual Consultants (IC) Method of Procurement Thresholds for Methods Competitive Selection Must meet the requirements of Section V, Para 5.1 to 5.5 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements of Section V, Para 5.6 of the Consultant Guidelines and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Consultant Guidelines Prior Review Thresholds: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.3 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. 1. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. The Request for Expression of Interest for consultancy services estimated to cost above USD 300,000 equivalent per contract for firms shall be advertised in UNDB online and World Bank external Website and in accordance with other provisions of Para 2.5 of the Consultant Guidelines 4. Any other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable] I. Implementing Agency Capacity Building Activities with Time Schedule No Expected Outcome/Activity Description Estimated Date Duration ASCI training on Procurement Procedures arranged for Executive, Assistant Engineers 1. 2 weeks Continuous who are responsible for Procurement – multiple trainings Contract management training – multiple 2. 2 weeks Continuous trainings Customized training on Procurement Procedures arranged for Executive, Assistant 3. 1 week Continuous Engineers who are responsible for Procurement – multiple trainings PROCUREMENT India : National Hydrology Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2017-08-11 2021-06-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152698 GPN Date: 2021-06-24 Project Name: National Hydrology Project Loan / Credit No: IBRD / 87250 Survey of India Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-SOI-44988-CW-DIR / Establishment of production facility for 1:25k geodatabase processing. Work involves civil Pending Water Resources Information Single Stage - One 2018-03- and electrical renovation in IBRD / 87250 Post Request for Bids Open - National 186,153.85 0.00 Implementat 2018-02-09 2018-02-14 2018-03-07 2018-03-12 2018-03-20 Systems Envelope 31 existing building. Work being ion executed through CPWD as per WB guidelines at NGDC/ DMC, Dehradun. IN-SOI-44996-CW-DIR / Establishment of production facility for 1:25k geodatabase processing. Work involves civil Pending Water Resources Information Single Stage - One 2018-03- and electrical renovation in IBRD / 87250 Post Request for Bids Open - National 204,615.39 0.00 Implementat 2018-02-09 2018-02-14 2018-03-07 2018-03-12 2018-03-20 Systems Envelope 31 existing building. Work being ion executed through CPWD as per WB guideline at GISTC/ UK&WUP GDC, Dehradun. IN-SOI-45002-CW-DIR / Establishment of production facility for 0.5m DEM data processing. Work involves civil Pending and electrical renovation in Water Resources Information Single Stage - One 2018-03- IBRD / 87250 Post Request for Bids Open - National 307,692.31 0.00 Implementat 2018-02-09 2018-02-14 2018-03-07 2018-03-12 2018-03-20 existing building. Work being Systems Envelope 31 ion executed through CPWD as per WB guidelines at G&RB office of Survey of India in Dehradun. IN-SOI-23030-CW-RFB / Lidar Survey- Acquisition and Water Resources Information Single Stage - One 2018-08- processing including setting IBRD / 87250 Post Request for Bids Open - National 4,492,307.69 0.00 Canceled 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 Systems Envelope 20 up of geospatial data production centre IN-SOI-61871-CW-RFQ / Pending Water Resources Information Request for Single Stage - One 2019-03- Establishment of production IBRD / 87250 Post Open - National 203,076.92 0.00 Implementat 2018-07-21 2018-09-15 Systems Quotations Envelope 14 facility for 3-5m DEM ion IN-SOI-62132-CW-RFB / Pending Institutional Capacity Single Stage - Two 2019-06- Setting up Production Centre IBRD / 87250 Post Request for Bids Open - National 71,646.15 0.00 Implementat 2018-07-16 2018-07-21 2018-09-01 2018-11-14 2018-12-19 Enhancement Envelope 17 for PDO ion NHP-2019-2020-SOI- Pending 778285 / Renovation of Water Resources Information Single Stage - Two 2020-07- IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 Implementat 2019-08-01 2019-08-06 2019-09-17 2019-11-30 2020-01-04 Server room for Data Systems Envelope 02 ion dissemination at NGDC, Dehradun NHP-2019-2020-SOI- Pending 335998 / Renovation for Water Resources Information Single Stage - Two 2020-03- IBRD / 87250 Post Request for Bids Open - National 409,230.77 0.00 Implementat 2019-04-15 2019-04-20 2019-06-01 2019-08-14 2019-09-18 1:25K gdb production centre Systems Envelope 16 ion at IISM Hyderabad NHP-2020-2021-SOI- 354799 / Renovation of Pending Institutional Capacity Single Stage - Two 2021-05- digital sections at NGDC for IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 Implementat 2020-06-01 2020-06-06 2020-07-18 2020-09-30 2020-11-04 Enhancement Envelope 03 data compilation, QC & data ion dissemination GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending IN-SOI-21678-GO-RFQ / Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 37,507.69 0.00 Implementati 2017-09-05 2017-10-31 2018-04-29 Furniture for PDO Enhancement Quotations Envelope on IN-SOI-23021-GO-RFB / Under Water Resources Information Single Stage - One Additional Hardware and IBRD / 87250 Post Request for Bids Open - National 278,461.54 0.00 Implementati 2017-11-01 2018-07-02 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Systems Envelope Software for updation on IN-SOI-60735-GO-RFB / Under Procurement of 02 nos. Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 246,153.85 291,392.00 Implementati 2018-04-25 2018-04-23 2018-04-25 2018-05-28 2018-06-18 2018-06-27 2018-09-17 2018-07-28 2018-09-26 Relative gravimeters for geoid Systems Envelope on modeling. IN-SOI-60751-GO-RFB / Under Procurement of Absolute Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 499,384.62 548,834.68 Implementati 2018-04-25 2018-04-23 2018-04-25 2018-05-28 2018-06-18 2018-06-27 2018-09-17 2018-07-28 2018-09-26 gravimeter (01 no.) for geoid Systems Envelope on modeling IN-SOI-21533-GO-RFB / Water Resources Information Single Stage - One Gravimeters for Survey of IBRD / 87250 Post Request for Bids Open - National 745,384.62 0.00 Canceled 2018-01-12 2018-01-17 2018-02-28 2018-03-30 2018-05-04 2018-10-31 Systems Envelope India IN-SOI-29487-GO-RFQ / Pending Institutional Capacity Request for Single Stage - One Procurement of mid level IBRD / 87250 Post Limited 59,261.54 0.00 Implementati 2017-10-11 2017-12-07 2018-06-05 Enhancement Quotations Envelope workstations for PDO on Page 1 IN-SOI-21535-GO-RFB / Under Procurement of Survey Water Resources Information Single Stage - One IBRD / 87250 Post Request for Bids Open - National 123,076.92 0.00 Implementati 2017-09-01 2018-07-02 2017-09-06 2020-10-14 2017-10-18 2017-11-17 2017-12-22 2018-06-20 Instruments for Geoid Systems Envelope on modelling IN-SOI-21608-GO-RFB / Pending Institutional Capacity Request for Single Stage - One Procurement of Laptops for IBRD / 87250 Post Limited 2,307.69 0.00 Implementati 2017-09-05 2017-10-31 2018-04-29 Enhancement Quotations Envelope PDO on Pending IN-SOI-21601-GO-RFB / Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 46,153.85 0.00 Implementati 2017-09-05 2017-10-31 2018-04-29 Purchase of vehicles for PDO Enhancement Quotations Envelope on Pending IN-SOI-61763-GO-RFQ / Water Resources Information Request for Single Stage - One IBRD / 87250 Post Limited 53,846.15 0.00 Implementati 2018-06-09 2018-08-04 2019-01-31 Procurement of 10 plotters Systems Quotations Envelope on IN-SOI-61764-GO-RFQ / Pending Water Resources Information Request for Single Stage - One Procurement of 05 drum IBRD / 87250 Post Limited 24,615.39 0.00 Implementati 2018-06-09 2018-08-04 2019-01-31 Systems Quotations Envelope scanners on IN-SOI-22160-GO-RFQ / Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 15,384.62 0.00 Canceled 2017-09-06 2017-11-01 2018-04-30 Printing Consumables Enhancement Quotations Envelope IN-SOI-23020-GO-DIR / Water Resources Information Cost of Satellite imagery for IBRD / 87250 Post Direct Selection Direct 746,200.00 0.00 Canceled 2018-01-01 2018-01-03 2018-01-11 2018-02-15 2018-08-14 Systems updation of geodatabase IN-SOI-22995-GO-RFQ / Setting up of Production Water Resources Information Request for Single Stage - One facility-Conference room, IBRD / 87250 Post Limited 15,384.62 0.00 Canceled 2017-09-06 2017-11-01 2018-04-30 Systems Quotations Envelope electrification, partitioning, computer table, chairs etc IN-SOI-23002-GO-RFB / Setting up of Production facility at multiple locations- Water Resources Information Single Stage - One IBRD / 87250 Post Request for Bids Open - National 186,153.85 0.00 Canceled 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Conference room, office Systems Envelope furniture and other petty items etc IN-SOI-22165-GO-RFB / Setting up of Geospatial Data Production Centres- all hardwares including servers, storage, workstations, Water Resources Information Single Stage - One firewall, ext HDD, related s/w, IBRD / 87250 Post Request for Bids Open - National 1,153,846.15 0.00 Canceled 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Systems Envelope and Non-IT infrastructures including electrification, networking, partioning,DG sets, UPS etc at multiple locations IN-SOI-23693-GO-RFQ / Pending Institutional Capacity Request for Single Stage - One Procurement of scanners, IBRD / 87250 Post Limited 83,230.76 0.00 Implementati 2018-06-16 2018-08-11 2019-02-07 Enhancement Quotations Envelope printers and plotters for PDO on IN-SOI-23006-GO-RFB / Water Resources Information Single Stage - One Scanners and Plotters - three IBRD / 87250 Post Request for Bids Open - National 158,461.54 0.00 Canceled 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Systems Envelope for multiple locations IN-SOI-61868-GO-RFB / Setting up of Continuously Water Resources Information Single Stage - Two IBRD / 87250 Prior Request for Bids Open - National 2,153,846.15 2,612,136.90 Signed 2018-07-10 2018-06-24 2018-07-15 2018-08-10 2018-08-26 2019-03-13 2018-11-08 2019-08-07 2018-12-13 2020-01-30 2019-06-11 Operating Reference System Systems Envelope (CORS) IN-SOI-61869-GO-RFB / Pending Procurement of PCs, Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 Implementati 2018-06-25 2018-06-30 2018-08-11 2018-10-24 2018-11-28 2019-05-27 workstations, laptops and Systems Envelope on office software for 1:25k gdb IN-SOI-61872-GO-RFB / Procurement of PCs, workstations,laptops, Under Water Resources Information Single Stage - Two scanners, plotters, firewall, IBRD / 87250 Post Request for Bids Open - National 220,461.54 0.00 Implementati 2018-06-25 2018-07-02 2018-06-30 2018-08-11 2018-10-24 2018-11-28 2019-05-27 Systems Envelope servers, storage devices with on related software for 3-5m DEM IN-SOI-61766-GO-DIR / Pending Procurement of satellite Water Resources Information Single Stage - One IBRD / 87250 Post Direct Selection Direct - National 1,538,461.54 0.00 Implementati 2018-07-10 2018-07-10 2018-07-20 2018-07-25 imagery for updation of 1:25k Systems Envelope on geodatabase. IN-SOI-80283-GO-DIR / 50 Nos. BOLERO CAMPER PS 4WD (Mahindra & Mahindra) Utility Vehicles procured on GeM Pending Water Resources Information under Proprietary Article IBRD / 87250 Post Direct Selection Direct 538,461.53 0.00 Implementati 2018-10-01 2018-10-06 2018-11-10 2019-05-09 Systems Certificate (PAC) category on through Bidding process. Vehicles will be employed for field survey activities. IN-SOI-94165-GO-DIR / Pending Procurement of 10 software Water Resources Information IBRD / 87250 Post Direct Selection Direct 630,769.23 0.00 Implementati 2019-01-09 2019-01-19 2019-03-01 2019-08-28 licenses of ESRI ArcGIS server Systems on (Advance) IN-SOI-22187-GO-RFQ / Water Resources Information Request for Single Stage - One Procurement of 01 flat bed IBRD / 87250 Post Limited 124,615.39 0.00 Canceled 2017-09-05 2017-10-31 2018-04-29 Systems Quotations Envelope scanner IN-SOI-61767-GO-DIR / Pending Procurement of stereo Water Resources Information IBRD / 87250 Post Direct Selection Direct 1,538,461.54 0.00 Implementati 2018-05-21 2018-05-26 2018-06-30 2018-12-27 satellite imagery for creation Systems on of 3-5m DEM of gap areas. IN-SOI-61870-GO-RFB / Pending Establishment of H/W Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 437,846.15 0.00 Implementati 2018-07-02 2018-07-07 2018-08-18 2018-10-31 2018-12-05 2019-06-03 infrastructure for Geospatial Systems Envelope on Data Centre for1:25k Page 2 NHP-2019-2020-SOI- 258275 / ESTABLISHMENT & COMMISSIONING OF IT INFRASTRUCTURE FOR Pending Water Resources Information Single Stage - Two ENTERPRISE DATA IBRD / 87250 Post Request for Bids Open - National 2,153,846.15 0.00 Implementati 2019-05-20 2019-05-25 2019-07-06 2019-09-18 2019-10-23 2020-04-20 Systems Envelope MANAGEMENT AND SERVICES on UNDER NATIONAL HYDROLOGY PROJECT NHP-2019-2020-SOI- Pending 460692 / Supply of high Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 124,615.38 0.00 Implementati 2019-04-02 2019-04-07 2019-05-19 2019-08-01 2019-09-05 2020-03-03 quality Flatbed Scanner A0 Systems Envelope on size NHP-2019-2020-SOI- Pending Water Resources Information Single Stage - Two 394987 / Devices for Data IBRD / 87250 Post Request for Bids Open - National 123,076.92 0.00 Implementati 2019-06-01 2019-06-06 2019-07-18 2019-09-30 2019-11-04 2020-05-02 Systems Envelope storage for 0.5 mtr DEM on NHP-2019-2020-SOI- 962156 / Procurement of Pending Water Resources Information Mono Satellite imagery for IBRD / 87250 Post Direct Selection Direct 1,076,923.08 0.00 Implementati 2019-03-01 2019-03-06 2019-04-10 2019-10-07 Systems updation of 1:25k on geodatabase NHP-2019-2020-SOI- 709840 / Procurement of Pending Water Resources Information Stereo Satellite imagery for IBRD / 87250 Post Direct Selection Direct 2,615,384.62 0.00 Implementati 2019-04-01 2019-04-06 2019-05-13 2019-11-09 Systems creation of 3-5m DEM of gap on areas NHP-2019-2020-SOI- Pending Water Resources Information Single Stage - Two 768812 / Procurement of IBRD / 87250 Post Request for Bids Open - National 461,538.46 0.00 Implementati 2019-09-15 2019-09-20 2019-11-01 2020-01-14 2020-02-18 2020-08-16 Systems Envelope GNSS Rover/Receiver on NHP-2019-2020-SOI- Under 263779 / Procurement of Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 230,769.23 0.00 Implementati 2019-09-15 2019-09-25 2019-09-20 2019-11-01 2020-01-14 2020-02-18 2020-08-16 GNSS Base (Reference) Systems Envelope on Receiver with external antenna NHP-2019-2020-SOI- Under Water Resources Information Single Stage - Two 721071 / Procurement of IBRD / 87250 Post Request for Bids Open - National 230,769.23 0.00 Implementati 2019-09-15 2019-10-18 2019-09-20 2019-11-01 2020-01-13 2020-01-14 2020-02-18 2020-08-16 Systems Envelope Field Data Collector (FDC) on NHP-2019-2020-SOI- Pending 370330 / Procurement of 2 Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 769,230.77 0.00 Implementati 2019-09-15 2019-09-20 2019-11-01 2020-01-14 2020-02-18 2020-08-16 numbers of UAVs based LiDAR Systems Envelope on System NHP-2019-2020-SOI- Pending 969211 / Procurement of UAV Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 38,461.54 0.00 Implementati 2019-09-15 2019-09-20 2019-11-01 2020-01-14 2020-02-18 2020-08-16 based LiDAR data processing Systems Envelope on software NHP-2019-2020-SOI- Pending Water Resources Information Request for Single Stage - One 410465 / Procurement of IBRD / 87250 Post Open - National 38,461.54 0.00 Implementati 2019-10-10 2019-12-05 2020-06-02 Systems Quotations Envelope storage devices on NHP-2019-2020-SOI- Pending Water Resources Information Single Stage - Two 718161 / Furniture for IBRD / 87250 Post Request for Bids Limited 30,769.23 0.00 Implementati 2019-11-25 2019-11-30 2019-12-15 2019-12-20 2020-01-10 2020-01-15 Systems Envelope Technical Wing of PDO on NHP-2020-2021-SOI- 481659 / Procurement of Pending Mono Satellite imagery for Water Resources Information IBRD / 87250 Post Direct Selection Direct 92,307.69 0.00 Implementati 2020-06-01 2020-06-06 2020-07-11 2021-01-07 updation of 1:25k Systems on geodatabase for additional work under NHP NHP-2020-2021-SOI- Pending 746804 / Procurement of Water Resources Information IBRD / 87250 Post Direct Selection Direct 1,076,923.08 0.00 Implementati 2020-07-01 2020-07-06 2020-08-14 2021-02-10 Stereo Satellite imagery for Systems on additional work under NHP NHP-2020-2021-SOI- Pending 720669 / Procurement of Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 180,000.00 0.00 Implementati 2020-05-20 2020-05-25 2020-07-06 2020-09-18 2020-10-23 2020-12-10 survey instruments for geoid Systems Envelope on modeling NHP-2019-2020-SOI- Water Resources Information Single Stage - Two 234698 / Procurement of 09 IBRD / 87250 Post Request for Bids Open - National 207,692.31 0.00 Canceled 2019-09-15 2019-09-20 2019-11-01 2020-01-14 2020-02-18 2020-08-16 Systems Envelope numbers of UAV NHP-2020-2021-SOI- 603630 / Procurement of 09 Pending UAV for the additional work of Water Resources Information Request for Single Stage - One IBRD / 87250 Post Limited 207,692.31 0.00 Implementati 2020-11-20 2021-01-11 2021-02-28 3-5m DEM & Geodatabase of Systems Quotations Envelope on West Bengal, Punjab etc. under NHP NHP-2021-2022-SOI- Pending 187237 / Procurement of Institutional Capacity Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 86,153.85 0.00 Implementati 2021-06-02 2021-06-07 2021-07-19 2021-10-01 2021-11-05 2022-05-04 Workstations for PDO from Enhancement Envelope on GeM NHP-2021-2022-SOI- 301385 / Procurement of Pending Water Resources Information Mono Satellite imagery for IBRD / 87250 Post Direct Selection Direct 76,923.08 0.00 Implementati 2021-07-04 2021-07-09 2021-08-13 2022-02-09 Systems updation of 1:25k on geodatabase NHP-2021-2022-SOI- Pending 694956 / Data Storage Water Resources Information Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 38,461.54 0.00 Implementati 2021-07-05 2021-07-10 2021-08-21 2021-11-03 2021-12-08 2022-06-06 devices/ Unified storage Systems Envelope on Sysytem etc. NHP-2021-2022-SOI- Pending 917193 / Procurement of Water Resources Information IBRD / 87250 Post Direct Selection Direct 76,923.08 0.00 Implementati 2021-07-01 2021-07-06 2021-08-10 2022-02-06 Stereo Satellite imagery for Systems on additional work under NHP Page 3 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-SOI-51084-NC-RFB / Providing Services for Generation of GIS ready Water Resources Information Single Stage - Two database for river IBRD / 87250 Prior Request for Bids Open - International 4,307,692.31 4,592,039.18 Signed 2018-03-12 2018-05-08 2018-04-06 2018-08-10 2018-05-21 2018-10-29 2018-08-03 2019-02-26 2018-09-07 2019-07-04 2020-02-29 Systems Envelope basins/deltas covering area of approximately 803402 sq. kms. IN-SOI-51103-NC-RFB / Provision of services for Water Resources Information Single Stage - Two Acquisition, Processing and IBRD / 87250 Prior Request for Bids Open - International 12,807,692.30 8,338,639.85 Signed 2018-03-12 2018-05-09 2018-04-11 2018-08-08 2018-05-26 2018-12-14 2018-09-08 2019-03-12 2018-10-13 2019-06-14 2019-08-09 Systems Envelope Delivery of DEM and Digital Ortho-Image NHP-2019-2020-SOI- 371845 / Provision of services Under Water Resources Information Single Stage - Two for creation of cross-section IBRD / 87250 Post Request for Bids Open - National 1,076,923.08 0.00 Implementati 2019-11-15 2020-12-21 2019-11-20 2020-01-01 2020-03-15 2020-04-19 2020-10-16 Systems Envelope surveys of rivers including on bathymetry NHP-2019-2020-SOI- 141708 / Provision of services Pending Water Resources Information Single Stage - Two for Creation of 3-5m DEM and IBRD / 87250 Post Request for Bids Open - National 923,076.92 0.00 Implementati 2019-10-15 2019-10-20 2019-12-01 2020-02-13 2020-03-19 2020-09-15 Systems Envelope feature extraction for Geo- on Database CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-SOI-21568-CS-QCBS / Procurement, Contract Institutional Capacity Quality And Cost- IBRD / 87250 Post Open - National 83,076.92 0.00 Canceled 2017-11-01 2017-11-22 2018-01-05 2018-02-02 2018-03-04 2018-04-08 2018-05-13 2019-05-13 Management and Project Enhancement Based Selection Management Specialists IN-SOI-21539-CS-QCBS / Consultant for setting up of Water Resources Information Quality And Cost- H/w infrastructure for IBRD / 87250 Post Open - National 46,153.84 0.00 Canceled 2017-07-24 2017-07-24 2017-09-06 2017-10-04 2017-11-03 2017-12-08 2018-01-12 2019-01-12 Systems Based Selection geospatial data production centres IN-SOI-23705-CS-QCBS / Institutional Capacity Quality And Cost- IBRD / 87250 Post Open - National 38,461.54 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-06 2018-03-13 2019-03-13 MIS assistant at PDO Enhancement Based Selection IN-SOI-23001-CS-QCBS / Hiring of technical resources Water Resources Information Quality And Cost- for spatial data editing and IBRD / 87250 Post Open - National 44,046.15 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-06 2018-03-13 2019-03-13 Systems Based Selection processing and QA/QC -10m DTM INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-SOI-23210-CS-INDV / Individual Water Resources Information Consultant for Lidar Survey- IBRD / 87250 Post Consultant Limited 46,153.85 0.00 Canceled 2017-12-01 2017-12-06 2017-12-27 2018-01-31 2018-07-30 Systems Hiring of Selection IN-SOI-23212-CS-INDV / Individual Water Resources Information Consultant for Setting up of IBRD / 87250 Post Consultant Limited 46,153.85 0.00 Canceled 2017-09-01 2017-09-06 2017-09-27 2017-11-01 2018-04-30 Systems CORS-Hiring of Selection Page 4 Procurement Plan I. General 1. Project Information Country : Bhutan Borrower : Watershed Management Division, Department of Forests and Park Services, Ministry of Agriculture and Forests Project Name : Bhutan REDD Readiness Project No. : P150177 2. Bank’s Approval Date of the Procurement Plan : January 15, 2018 In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. II. Goods, Works and Non consulting Services 1. Prior Review Threshold Method of Thresholds for Method Prior Review Procurement (USD equivalent) Threshold (USD) ICB (Goods) > 200,000 USD All contracts above 100,000 NCB ( Goods) > USD 30,000 and up to USD 200,000 Shopping (Goods) Up to USD 30,000 ICB (Non- > 200,000 USD All contract above Consulting 100,000 Services) NCB (Non- < 200,000 USD Consulting Services) Direct Contracting No Threshold; meet paragraph 6.8, 6.9 and 6.10 of regulations Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified depending on the risk assessment and implementation of mitigation measures. In the case of contracts subject to prior review, before granting / agreeing to (a) a material extension of the stipulated time for performance of a contract; or (b) any substantial modification or waiver of the scope of services or other significant changes to the terms and conditions of such that the contract, including issuing; or (c) any change variation order or orders under such contract amendment (except in cases of extreme urgency) which would in aggregate, singly or combined with all variation orders or amendments previously issued, increase the original contract amount of the contract by more than 15% (fifteen percent); or (d) the proposed termination of the original price contract, the Borrower shall seek the Bank’s no objection to the proposed extension, modification, or change order. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable 3. Reference to Project operational/Procurement Manual Standard Bidding Documents agreed between Project and Bank will be used for all works, consultancy and goods procurements. 4. Any Other Special Procurement Arrangements: National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process.. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. II. Domestic Preference. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods). Goods: is applicable for those contracts identified in the Procurement Plan tables; The bid evaluation will be carried out as per agreed timeline in the Procurement Activity Schedule III. Selection of Consultant 1. Prior Review Threshold Method of Threshold (USD Prior Review Threshold Procurement Equivalent) (a) Quality and Cost No threshold All Contracts above Based Selection 70,000 USD for (b) Quality Based No threshold Consultant Firms Selection (c) Selection Made No threshold All contracts above Under a Fixed Budget 50,000 USD for (d) Least Cost Selection No threshold Individual Consultants. (e) Selection Based on < 100,000 Consultant’s Qualifications (f) Single Source As per Section VII of Selection of firms regulations (para 7.13 to 7.15) (g) Selection of No threshold Individual Consultants Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 200,000 equivalent per contract, may comprise entirely of national consultants. PROCUREMENT Bhutan : Bhutan REDD Readiness PLAN General Information Country: Bhutan Bank’s Approval Date of the Original Procurement Plan: 2016-05-31 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150177 GPN Date: 2016-09-20 Project Name: Bhutan REDD Readiness Loan / Credit No: TF / 19030, TF / A6108 W Executing Agency(ies): atershed Management Division, Department of Forests and Park Services WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BT-WMD-83809-CW-RFB / Renovate existing old structure and create space for Single Stage - One 2019-09- TF / A6108 Post Request for Bids Limited 11,764.71 11,449.47 Completed 2018-11-30 2018-08-10 2018-12-05 2018-08-14 2019-01-16 2018-09-28 2019-02-15 2018-10-15 2019-03-22 2018-11-14 Project Management Envelope 18 Office(PMO) by National Land Commission GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-WMD-138-GO-RFQ / Request for Single Stage - One Procurement of CHN & S TF / 19030 Post Limited 93,000.00 92,462.00 Completed 2016-05-31 2016-07-05 2016-07-28 2016-08-31 2017-10-17 Quotations Envelope analyzer FRMD/R-PP/NFI/3/2017- 2018/02 / Printing of TF / 19030 Post Direct Selection Direct 18,461.53 0.00 Canceled 2018-03-06 2018-06-12 2018-05-30 2018-07-04 2018-12-31 National Forest Inventory Report Volume II BT-WMD-37728-GO-RFQ / Printing of REDD+ related Request for Single Stage - One documents, LULC 2016, TF / 19030 Post Open - National 23,076.92 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 Quotations Envelope Forest and Nature Conservation Rules and Regulations 2017 BT-WMD-37723-GO-RFQ / Request for Single Stage - One Procurement of 5 Laptops, 1 TF / 19030 Post Limited 9,000.00 0.00 Canceled 2017-12-16 2017-11-20 2018-02-10 2018-08-09 Quotations Envelope computer, three hard drives BT-WMD-37725-GO-RFQ / Request for Single Stage - One Procurement of Computer and TF / 19030 Post Limited 1,538.46 0.00 Canceled 2017-12-30 2018-02-24 2018-08-23 Quotations Envelope Peripherals BT-WMD-37729-GO-RFQ / Procurement of Video Request for Single Stage - One conference system: TV screen TF / 19030 Post Open - National 13,846.15 0.00 Canceled 2017-12-30 2018-02-24 2018-08-23 Quotations Envelope and system; Projector; and Camera and a printer BT-WMD-52583-GO-DIR / Procurement of vehicles TF / 19030 Prior Direct Selection Direct 135,000.00 0.00 Canceled 2018-04-12 2018-04-17 2018-05-22 2018-11-18 around (5 nos) BT-WMD-54236-GO-RFQ / Procurement of heavy duty Request for Single Stage - One multipurpose machine for TF / 19030 Post Limited 3,000.00 0.00 Canceled 2018-04-05 2018-05-05 2018-05-31 2018-11-27 Quotations Envelope printing and photcopying for Director office BT-WMD-54246-GO-RFQ / Request for Single Stage - One Procurement of furniture for TF / 19030 Post Limited 20,000.00 0.00 Canceled 2018-04-06 2018-06-01 2018-11-28 Quotations Envelope WMD and field offices BT-WMD-61320-GO-RFQ / Procurement of EGM-5 Request for Single Stage - One Portable C02 Gas Analyze to TF / 19030 Post Limited 11,569.00 9,185.55 Completed 2018-05-12 2018-03-30 2018-07-07 2018-05-07 2019-01-03 2018-05-28 Quotations Envelope measure CO2 sequestration and Soil CO2 efflux BT-WMD-77186-GO-RFQ / Procurement CCTV set by Request for Single Stage - One Wangdue Territorial Division TF / A6108 Post Limited 12,780.00 2,977.31 Completed 2019-01-04 2019-02-11 2019-03-01 2019-03-19 2019-08-28 2019-04-01 Quotations Envelope (Under Department of Forest and Park Services) BT-WMD-77187-GO-RFQ / Procurement of 1 Samsung 42inch LED monitor, 4 desktop, 1 laptop(mid-end), 1 laptop (low-end), 4 scanner, 2 Request for Single Stage - One TF / A6108 Post Limited 5,892.00 2,470.30 Completed 2019-01-04 2019-02-11 2019-03-01 2019-03-19 2019-08-28 2019-03-30 Backup hard drive and 4 Quotations Envelope printers by Wangdue Territorial Division(under Department of Forest and Park Services) BT-WMD-77702-GO-RFQ / Procurement of 2 laptops, 3 GPS, wedge prism, 5 DBH Request for Single Stage - One tape, etc by Wangdue TF / A6108 Post Limited 3,736.00 327.37 Completed 2018-12-06 2018-12-03 2019-01-31 2019-01-22 2019-07-30 2019-06-28 Quotations Envelope Territorial Division(under Department of Forest and Park Services) BT-WMD-83260-GO-RFQ / Procurement of one lab microtome for wood anatomy Request for Single Stage - One TF / A6108 Post Open - National 5,500.00 2,805.48 Completed 2019-01-04 2019-03-01 2019-04-23 2019-08-28 2019-05-28 study by Ugyen Wangchuck Quotations Envelope Institute for Conservation and Environment Page 1 BT-WMD-71554-GO-DIR / Procurement of 5 Isuzu vehicles by department of TF / A6108 Post Direct Selection Direct 85,000.00 16,410.45 Completed 2018-11-30 2018-11-30 2018-12-05 2018-11-30 2019-01-09 2018-12-24 2019-07-08 2018-12-26 Forests and Park Services for forest fire and law enforcement activities BT-WMD-89247-GO-DIR / Purchase of training materials(Purchase of laminated timbers from TF / A6108 Post Direct Selection Direct 31,215.00 33,316.65 Signed 2019-01-01 2020-01-13 2019-01-06 2021-03-02 2019-02-10 2019-10-03 2019-08-09 Natural Resources Development Corporation Limited) by Royal Academy BT-WMD-89249-GO-DIR / Procurement of training materials to develop local capacity for glulam production, joinery and TF / A6108 Post Direct Selection Direct 31,846.00 38,735.88 Signed 2019-01-01 2019-09-30 2019-01-06 2020-04-05 2019-02-10 2019-11-20 2019-08-09 erection procedures from Hangzhou Tech Drying Equipment Co. Ltd , China by Royal Academy BT-WMD-93185-GO-RFQ / Procurement of Forest Inventory Equipment ( 6 Request for Single Stage - One tablets and 7 power banks) by TF / A6108 Post Limited 2,307.69 2,209.38 Completed 2019-01-12 2019-01-29 2019-03-09 2019-03-21 2019-09-05 2019-05-08 Quotations Envelope Forest Resource Management Division under Department of Forest and Park Services. BT-WMD-83808-GO-RFB / Procurement of one e- Single Stage - One cognition software for object- TF / A6108 Post Request for Bids Open - National 28,900.00 28,376.00 Completed 2019-02-01 2019-06-05 2019-02-06 2019-03-20 2019-07-05 2019-04-19 2019-07-19 2019-05-24 2019-08-12 2019-11-20 2019-10-23 Envelope based image analysis by National Land Commission BT-WMD-94052-GO-RFB / Procurement of 6 working table,2 double bookshelf,10 normal office table,4 computer standard table,1 Request for Single Stage - One TF / A6108 Post Limited 7,270.29 5,538.43 Completed 2019-02-06 2019-08-05 2019-04-03 2019-08-05 2019-09-30 2019-11-07 sofa triple seater, 1 sofa Quotations Envelope single,2 ergohuman elite with head rest office chair and 1 centre table by National Land Commission. BT-WMD-94061-GO-RFB / Procurement of 1 i mac,3 mac Under book pro,2 color printers (3 in Request for Single Stage - One TF / A6108 Post Limited 18,235.29 0.00 Implementati 2019-03-12 2019-06-03 2019-05-07 2019-11-03 1) and 1 printer (3 in 1) and Quotations Envelope on accessories by National Land Commission BT-WMD-66730-GO-RFB / Procurement of equipment Single Stage - One (Work station - hi- TF / A6108 Post Request for Bids Open - National 112,069.94 11,754.88 Completed 2019-03-04 2019-07-19 2019-03-11 2019-04-22 2019-06-05 2019-06-11 2019-06-19 2019-06-27 2019-08-12 2019-12-24 2019-12-04 Envelope specification) by National Land Commission BT-WMD-101021-GO-RFQ / Procurement of extension kits and field gears like sleeping Request for Single Stage - One bags and mats done by TF / A6108 Post Limited 811.00 32,366.72 Completed 2019-03-09 2019-03-15 2019-05-04 2019-04-10 2019-10-31 2019-09-11 Quotations Envelope UWICER - under the DoFPS PIU- for the field staff based around the 20 dzongkhags BT-WMD-101022-GO-RFQ / Procurement of one soxhlet apparatus, complete increment borer, 10 Diameter Tape, 10 Measuring Tape, 6 Request for Single Stage - One Swiss made Secrateurs ,8 TF / A6108 Post Limited 7,190.00 17,037.45 Completed 2019-03-09 2019-03-15 2019-05-04 2019-04-24 2019-10-31 2019-05-28 Quotations Envelope swiss made Pruning Saw,4 Chainsaw bar Steel, 4 Chainsaw chain all a part of research biomass equipment procured by UWICER,DoFPS BT-WMD-101023-GO-DIR / Procurement of 500 Numbers fire suppression systems from Tashi Gatshel Enterprise by TF / A6108 Post Direct Selection Direct 33,800.00 12,680.20 Completed 2019-02-25 2019-02-25 2019-03-02 2019-02-26 2019-04-06 2019-03-07 2019-10-03 2019-03-07 Forest Protection and Enforcement Division (FPED), DoFPS PIU BT-WMD-71842-GO-DIR / Procurement of one toyota coaster bus (4 cylinder/27 TF / A6108 Post Direct Selection Direct 89,705.88 76,281.41 Completed 2018-07-30 2019-04-11 2018-08-04 2019-04-15 2018-09-08 2019-04-18 2019-03-07 2019-08-14 seater) by National Land Commission BT-WMD-101018-GO-RFQ / Procure office equipment (5 TF / A6108 Post Direct Selection Direct 1,800.00 0.00 Canceled 2019-03-18 2019-03-23 2019-04-27 2019-10-24 Chairs and 2 Bookshelves) for WMD- PIU BT-WMD-104088-GO-RFQ / Procurement of one heavy Request for Single Stage - One TF / 19030 Post Limited 3,075.00 2,473.41 Completed 2019-03-16 2019-05-11 2018-05-22 2019-11-07 2018-09-13 duty machine for Directorate Quotations Envelope Section, DoFPS BT-WMD-104944-GO-RFQ / Procurement of one high end workstation and one Request for Single Stage - One Uninterruptible Power Supply TF / A6108 Post Limited 5,200.00 0.00 Canceled 2019-04-20 2019-06-15 2019-12-12 Quotations Envelope (UPS) Back up by Forest Resources Management Division. Page 2 BT-WMD-103219-GO-RFQ / Procurement one Stevens HydraProbe II and one EGM5 Rugged Transport Case to Request for Single Stage - One measure Soil & water TF / A6108 Post Limited 689.00 3,341.71 Completed 2019-03-30 2019-05-21 2019-05-25 2019-05-06 2019-11-21 2019-05-23 Quotations Envelope temperature by Ugyen Wangchuck Institute for Conservation and Environmental Research,DoFPS BT-WMD-101056-GO-RFQ / Procurement of 120 Android Tablet for SMART patrolling in Request for Single Stage - One TF / A6108 Post Limited 30,769.00 224.42 Completed 2019-04-27 2019-04-18 2019-06-22 2019-05-13 2019-12-19 2019-05-25 the parks and forest divisions Quotations Envelope by Nature Conservation Division, DoFPs PIU BT-WMD-110295-GO-DIR / Procurement of 200 Helmet, 200 Goggles,200 Mask,200 TF / A6108 Post Direct Selection Direct 2,400.00 1,020.25 Completed 2019-04-22 2019-05-10 2019-04-27 2019-05-10 2019-06-01 2019-05-31 2019-11-28 2019-05-31 fire rake, 100 Head light,100 Patang by Forest Protection & Enforcement Division (FPED) BT-WMD-101016-GO-RFQ / Procurement of Two 60" TV screens, 2 video conferencing Request for Single Stage - One system(1 for WMD and 1 for TF / A6108 Post Limited 30,000.00 13,313.55 Completed 2019-05-18 2019-05-17 2019-07-13 2019-06-24 2020-01-09 2019-06-24 Quotations Envelope Director office), 2 projectors by WMD, which is the Project Implementing Unit(PIU) BT-WMD-113684-GO-RFQ / Purchase of Equipment: data loggers with accessories (HOBO)for Temp/RH, HOBO Request for Single Stage - One rain gauges, HOBO solar TF / A6108 Post Limited 7,692.00 7,570.53 Completed 2019-05-15 2019-05-17 2019-07-10 2019-06-24 2020-01-06 2019-06-25 Quotations Envelope radiation shields, batteries (data logger and rain gauge), Optic USB base station, Water quality testers by WMD BT-WMD-113879-GO-DIR / Procurement of 9 laptops(7 TF / A6108 Post Direct Selection Direct 20,000.00 806.82 Completed 2019-05-10 2018-10-24 2019-05-15 2019-04-05 2019-06-19 2019-05-01 2019-12-16 2019-05-04 for NCD,1 for FRMD ,1 for WMD) by WMD BT-WMD-113880-GO-DIR / Procurement of 10 printer(1 TF / A6108 Post Direct Selection Direct 2,700.00 971.16 Completed 2019-05-10 2019-05-15 2019-05-10 2019-06-19 2019-05-10 2019-12-16 2019-05-24 for SFED,3 for WMD,6 for FPED) by WMD BT-WMD-113885-GO-DIR / Procurement of 6 high end TF / A6108 Post Direct Selection Direct 4,200.00 508.67 Completed 2019-05-10 2019-06-11 2019-05-15 2019-12-19 2019-06-19 2020-01-22 2019-12-16 2020-01-22 computer for FPED BT-WMD-113887-GO-RFQ / Procurement of 2 high-spec Request for Single Stage - One TF / A6108 Post Limited 6,153.00 2,453.66 Completed 2019-05-15 2019-05-17 2019-07-10 2019-06-24 2020-01-06 2019-06-26 laptops(FRMD and WMD) and Quotations Envelope two docking device by WMD BT-WMD-114065-GO-DIR / Procurement of 2 color TF / A6108 Post Direct Selection Direct 800.00 333.49 Completed 2019-05-10 2019-05-15 2018-11-26 2019-06-19 2019-05-10 2019-12-16 2019-05-14 printers by WMD BT-WMD-114067-GO-DIR / Procurement of 2 projectors TF / A6108 Post Direct Selection Direct 1,600.00 1,406.73 Completed 2019-05-10 2019-05-15 2019-05-22 2019-06-19 2019-05-23 2019-12-16 2019-05-23 by WMD BT-WMD-118309-GO-RFQ / Under Request for Single Stage - One Procurement of soil sample TF / 19030 Post Limited 3,000.00 1,518.01 Implementati 2019-06-14 2019-06-20 2019-08-09 2019-06-24 2020-02-05 2019-06-26 Quotations Envelope storing plastic containers on BT-WMD-118313-GO-DIR / Procurement of one Desktop TF / A6108 Post Direct Selection Direct 300.00 237.44 Completed 2019-06-09 2019-06-07 2019-06-14 2019-06-07 2019-07-19 2019-06-07 2020-01-15 2019-06-07 computer by NCD BT-WMD-118315-GO-DIR / Procurement of 36 water bag TF / A6108 Post Direct Selection Direct 16,000.00 13,677.92 Completed 2019-06-09 2019-06-11 2019-06-14 2019-06-13 2019-07-19 2019-06-21 2020-01-15 2019-06-21 for firefighting by FPED BT-WMD-118320-GO-DIR / Procurement of two high TF / A6108 Post Direct Selection Direct 2,770.00 1,886.65 Completed 2019-06-09 2019-07-08 2019-06-14 2020-04-20 2019-07-19 2020-04-20 2020-01-15 2020-06-02 specs laptops by UWICER BT-WMD-118383-GO-DIR / Procurement of training Pending materials (four sided TF / A6108 Post Direct Selection Direct 4,650.00 0.00 Implementati 2019-06-23 2019-06-28 2019-08-02 2020-01-29 planners) to develop local on capacity for glulam production by Royal Academy BT-WMD-118382-GO-DIR / Procurement of training Pending materials to develop local Request for Single Stage - One TF / A6108 Post Limited 15,350.00 0.00 Implementati 2019-08-03 2019-09-28 2020-03-26 capacity for glulam Quotations Envelope on production, scissor lift by Royal Academy BT-WMD-124363-GO-RFQ / Projectors and accessories (2 Request for Single Stage - One TF / A6108 Post Limited 6,000.00 1,412.85 Completed 2019-08-04 2019-08-22 2019-09-29 2019-11-29 2020-03-27 2019-12-30 Numbers) by National Land Quotations Envelope Commission BT-WMD-124365-GO-RFQ / Request for Single Stage - One Hand held GPS (10 Numbers) TF / A6108 Post Limited 3,000.00 6,445.79 Completed 2019-08-04 2019-08-22 2019-09-29 2019-12-02 2020-03-27 2020-03-10 Quotations Envelope by National Land Commission BT-WMD-124367-GO-RFQ / Request for Single Stage - One WiFi routers (5 Numbers) by TF / A6108 Post Limited 1,000.00 1,321.86 Completed 2019-08-04 2019-08-22 2019-09-29 2019-12-02 2020-03-27 2019-12-30 Quotations Envelope National Land Commission Page 3 BT-WMD-124862-GO-RFQ / Procurement of 17 Laptops by Request for Single Stage - One TF / A6108 Post Limited 14,000.00 14,637.14 Completed 2019-08-05 2019-08-22 2019-09-30 2019-11-28 2020-03-28 2020-03-10 National Land Commission Quotations Envelope Secretariat BT-WMD-138474-GO-DIR / Procurement of 25 (24 desktops for field offices for forest information system and TF / A6108 Post Direct Selection Direct 16,000.00 502.03 Completed 2019-10-14 2019-06-11 2019-10-19 2020-02-03 2019-11-23 2020-03-27 2020-05-21 2020-03-27 1 for Department) and 2 desktop screens for WMD by WMD BT-WMD-148153-GO-DIR / Procurement of laptops (4 TF / A6108 Post Direct Selection Direct 4,498.93 1,303.80 Completed 2019-12-09 2019-06-11 2019-12-14 2019-12-19 2020-01-18 2019-12-24 2020-07-16 2019-12-24 numbers) by FPED BT-WMD-150892-GO-DIR / procurement of Printers (6 TF / A6108 Post Direct Selection Direct 1,404.00 1,303.80 Completed 2019-12-23 2019-06-11 2019-12-28 2019-12-19 2020-02-01 2019-12-24 2020-07-30 2019-12-24 nos) by FPED BT-WMD-151960-GO-RFQ / Request for Single Stage - One Procurement of TDR150 Soil TF / A6108 Post Open - National 1,753.00 2,712.63 Completed 2020-01-04 2020-02-29 2020-03-11 2020-08-27 2020-11-23 Quotations Envelope Water Sensor by UWICER, Darla BT-WMD-151961-GO-RFQ / Request for Single Stage - One Procurement of TMS-4 Soil TF / A6108 Post Open - National 625.00 418.23 Signed 2020-01-04 2020-02-29 2020-03-23 2020-08-27 Quotations Envelope data logger by UWICER, Darla BT-WMD-151962-GO-RFQ / Procurement of Muffle Request for Single Stage - One TF / A6108 Post Open - National 1,040.00 1,037.09 Completed 2020-01-04 2020-02-29 2020-03-23 2020-08-27 2020-11-23 Furnace 30x20x20cm by Quotations Envelope UWICER, Darla BT-WMD-151963-GO-DIR / Procurement of high specific labtops (54 numbers) by TF / A6108 Post Direct Selection Direct 53,538.00 929.46 Completed 2020-01-01 2020-01-23 2020-01-06 2020-05-26 2020-02-10 2020-05-26 2020-08-08 2020-07-31 FRMD for conduct of NFI and data storage and transfer in the field by inventory crews BT-WMD-151964-GO-DIR / Procurement of Data management system for NFI in TF / A6108 Post Direct Selection Direct 14,260.00 13,715.23 Signed 2020-01-01 2020-01-23 2020-01-06 2020-03-05 2020-02-10 2020-03-05 2020-08-08 field offices desktop computer (26 numbers) by FRMD BT-WMD-151966-GO-DIR / Procurement of 210 numbers each of head light and TF / A6108 Post Direct Selection Direct 4,226.00 13,368.50 Completed 2020-01-01 2020-05-14 2020-01-06 2020-03-11 2020-02-10 2020-03-11 2020-08-08 2020-10-30 sleeping mat for conduct of NFI by FRMD BT-WMD-151967-GO-DIR / Procurement of rain gears 10 TF / A6108 Post Direct Selection Direct 3,540.00 0.00 Canceled 2020-01-01 2020-01-06 2020-02-10 2020-08-08 number for NFI field crews by FRMD BT-WMD-151968-GO-RFQ / Request for Single Stage - One Procurement of GPS (64 nos) TF / A6108 Post Open - National 32,000.00 292.17 Completed 2020-01-06 2020-03-02 2020-04-02 2020-08-29 2020-09-16 Quotations Envelope for conduct of NFI by FRMD BT-WMD-151979-GO-DIR / Procurment of 64 numbers each of clinometer, campass TF / A6108 Post Direct Selection Direct 22,878.00 22,004.61 Completed 2020-01-01 2020-01-23 2020-01-06 2020-03-11 2020-02-10 2020-03-11 2020-08-08 2021-02-25 and four men tent and 210 numbers of head light for conduct of NFI by FRMD BT-WMD-151982-GO-DIR / Procurment of 210 numbers each of Ruck Sack Bag and TF / A6108 Post Direct Selection Direct 8,050.00 7,696.04 Signed 2020-01-01 2020-01-23 2020-01-06 2020-03-11 2020-02-10 2020-03-11 2020-08-08 Bag Pack for NFI field crews by FRMD BT-WMD-151983-GO-RFB / Procurment of android tablet (100 nos) and SD Card 64 Single Stage - One TF / A6108 Post Request for Bids Open - National 39,285.70 206.55 Completed 2020-01-01 2020-01-22 2020-01-06 2020-02-17 2020-03-02 2020-03-18 2020-03-13 2020-04-22 2020-04-07 2020-10-19 2020-08-16 GB/128GB (120 nos) for Envelope conduct of National Forest Inventory (NFI) by FRMD BT-WMD-151984-GO-RFQ / Procurment of Power bank Request for Single Stage - One (20000amp) (100 nos) a for TF / A6108 Post Open - National 7,143.00 33.51 Completed 2020-01-06 2020-03-02 2020-03-27 2020-08-29 2020-06-26 Quotations Envelope conduct of National Forest Inventory (NFI) by FRMD BT-WMD-151987-GO-RFB / Procurement of 64 numbers each of measuring tape, diameter tape, crown Single Stage - One TF / A6108 Post Request for Bids Open - National 35,200.00 6,335.83 Completed 2020-01-01 2020-02-03 2020-01-06 2020-02-17 2020-03-02 2020-03-18 2020-03-13 2020-04-22 2020-03-27 2020-10-19 2020-09-17 densitometer, incrememnt Envelope borer, bark gauage, measuring scale, ruler, pruning shears and hammer by FRMD BT-WMD-151988-GO-RFB / Procurement of 64 numbers Single Stage - One TF / A6108 Post Request for Bids Open - National 52,115.00 709.69 Completed 2020-01-01 2020-01-20 2020-01-06 2020-02-17 2020-04-27 2020-03-18 2020-04-28 2020-04-22 2020-06-04 2020-10-19 2020-10-02 of metal detector for onduct Envelope of NFI by FRMD BT-WMD-151990-GO-RFQ / Procurment of silpaulin sheet (120 nos), 250 numbers each of sleeping bags ,water Single Stage - One bottles , knife, suncap (printd TF / A6108 Post Request for Bids Open - National 48,000.00 224.46 Completed 2020-01-01 2020-01-22 2020-01-06 2020-02-17 2020-03-02 2020-03-18 2020-03-16 2020-04-22 2020-03-27 2020-10-19 2020-08-06 Envelope with NFI), rain jacket (printed with NFI) and survvival kit and solar lite (GD Lite) for conduct of NFI by FRMD Page 4 BT-WMD-152151-GO-RFQ / Procurement of Aluminium witness tags (400kg/ 30000 pieces), Aluminium plot centre tags (200kg/ 30000 pieces), Request for Single Stage - One TF / A6108 Post Open - National 13,000.00 27,684.05 Completed 2020-01-06 2020-03-02 2020-03-27 2020-08-29 2020-09-30 Aluminium tree tags (200kg/ Quotations Envelope 60000 pieces), Iron rod (customized) for plot centre (100 kg / 30000 pieces) for conduct of NFI by FRMD BT-WMD-152153-GO-RFQ / Procurement of soil sampling Request for Single Stage - One frame (64Nos), aluminium TF / A6108 Post Open - National 8,000.00 2,685.38 Completed 2020-01-06 2020-03-02 2020-03-27 2020-08-29 2020-07-22 Quotations Envelope nails (400kg/ 60000 pieces) by FRMD BT-WMD-152159-GO-RFQ / Procurement of Hanging Weighing Scale(64n),Straight edged saw (64n),Small hand shovel(64n),Polythene bags (200kgs),Labeling pens Request for Single Stage - One TF / A6108 Post Open - National 20,000.00 9,250.52 Completed 2020-01-06 2020-03-02 2020-03-27 2020-08-29 2020-09-30 (500n),Flagging tags(500 Quotations Envelope rolls),Rope (300n),Muslin bags (2000 bags),Tarpaulin with grommet (300sheets),Sieves(64n) by FRMD BT-WMD-151985-GO-RFB / Procurment of 64 numbers of Single Stage - One TF / A6108 Prior Request for Bids Open - National 137,142.85 138,196.21 Completed 2020-01-01 2020-02-04 2020-01-06 2020-02-12 2020-02-17 2020-03-09 2020-03-18 2020-04-27 2020-04-22 2020-05-15 2020-10-19 2020-07-15 hypsometer for conduct of NFI Envelope by FRMD BT-WMD-153366-GO-RFB / Procurement of 24 sets of Single Stage - One Global Water flow probes and TF / A6108 Post Request for Bids Open - National 75,000.00 74,637.68 Completed 2020-01-20 2020-03-06 2020-01-25 2020-03-07 2020-04-03 2020-04-06 2020-04-08 2020-05-11 2020-05-04 2020-11-07 2020-06-19 Envelope 4 sets of OTT MF Pro Flow meter by WMD BT-WMD-153367-GO-RFB / Procurement of Optic USB Base Station(12),Hobo RG3 rainguage with pendent event sensors(25),Hobo pro V2 Single Stage - One Logger with TF / A6108 Post Request for Bids Open - National 35,000.00 29,043.02 Completed 2020-01-20 2020-03-06 2020-01-25 2020-03-07 2020-04-03 2020-04-06 2020-04-08 2020-05-11 2020-04-27 2020-11-07 2020-06-19 Envelope accessories(25),Hobo solar radiation shield(25),Hobo pro V2 batteries(150),CR2032 rainguage batteries(150) by WMD BT-WMD-153547-GO-RFQ / Procurement of PCS tester Request for Single Stage - One TF / A6108 Post Open - National 1,600.00 4,680.67 Completed 2020-01-25 2020-03-21 2020-05-12 2020-09-17 2020-06-19 callibiration solution (500 ml) Quotations Envelope (56 nos) BT-WMD-153546-GO-RFQ / Request for Single Stage - One Procurement of PCS tester (28 TF / A6108 Post Open - National 11,200.00 5,478.92 Completed 2020-01-25 2020-03-21 2020-05-12 2020-09-17 2020-06-19 Quotations Envelope nos) by WMD BT-WMD-160329-GO-RFQ / Procurement of 4 computer Request for Single Stage - One monitor for use by FRMD for TF / A6108 Post Open - National 3,000.00 1,909.22 Completed 2020-02-29 2020-04-25 2020-05-13 2020-10-22 2020-06-03 Quotations Envelope NFI and FMU data cleaning and analysis by FRMD BT-WMD-160330-GO-DIR / Procurement of one macbook TF / A6108 Post Direct Selection Direct 1,800.00 1,633.91 Completed 2020-02-24 2020-04-01 2020-02-29 2020-04-02 2020-04-04 2020-04-02 2020-10-01 2020-07-31 pro for NFI by FRMD BT-WMD-160331-GO-DIR / Procurement of 14 high TF / A6108 Post Direct Selection Direct 14,000.00 929.46 Completed 2020-02-24 2020-05-18 2020-02-29 2020-05-26 2020-04-04 2020-05-26 2020-10-01 2020-07-29 specification laptops for NFI and FMU by FRMD BT-WMD-160333-GO-RFQ / Procurement of one video Request for Single Stage - One conferencing Television TF / A6108 Post Open - National 4,500.00 4,056.93 Completed 2020-02-29 2020-04-25 2020-05-13 2020-10-22 2020-10-07 Quotations Envelope Screen (80 inch or more ) by FRMD BT-WMD-165037-GO-DIR / Procurement of 4 Laptops (3 TF / A6108 Post Direct Selection 4,500.00 1,070.77 Completed 2020-03-23 2019-06-11 2020-03-23 2020-06-15 2020-03-23 2020-06-15 2020-03-23 2020-09-24 for WMD and 1 for SFED) by WMD BT-WMD-168983-GO-DIR / Procurement of 5 CISCO network boxes for the TF / A6108 Post Direct Selection Direct 1,780.00 351.37 Completed 2020-04-23 2020-03-03 2020-04-28 2020-04-20 2020-06-02 2020-04-20 2020-11-29 2020-04-27 National Forest Monitoring System of the Department by WMD BT-WMD-168985-GO-DIR / Pending Procurement of 27 (nos) of TF / A6108 Post Direct Selection Direct 7,044.00 0.00 Implementati 2020-04-23 2020-04-28 2020-06-02 2020-11-29 water back pump by FPED on BT-WMD-171265-GO-DIR / Procurement of 40 numbers TF / A6108 Post Direct Selection Direct 5,600.00 124.81 Completed 2020-05-01 2020-06-12 2020-05-06 2020-06-12 2020-06-10 2020-06-12 2020-12-07 2020-07-22 of four men tent to conduct of NFI by FRMD BT-WMD-171266-GO-DIR / Procurement of 40 numbers each of Ruck sack bag and TF / A6108 Post Direct Selection Direct 1,600.00 724.75 Signed 2020-05-01 2020-05-25 2020-05-06 2020-06-03 2020-06-10 2020-06-03 2020-12-07 bag pack for NFI field crews by FRMD BT-WMD-171268-GO-DIR / Procurement of 30 Power bank (20000amp) a for TF / A6108 Post Direct Selection Direct 1,285.70 0.00 Canceled 2020-05-01 2020-05-06 2020-06-10 2020-12-07 conduct of National Forest Inventory (NFI) by FRMD Page 5 BT-WMD-171269-GO-RFQ / Procurement of 200 bundles Request for Single Stage - One TF / A6108 Post Open - National 800.00 131.91 Signed 2020-05-06 2020-07-01 2020-06-19 2020-12-28 of ropes for conduct of NFI by Quotations Envelope FRMD BT-WMD-171272-GO-RFQ / Pending Procurement of GPS batteries Request for Single Stage - One TF / A6108 Post Open - National 1,430.00 0.00 Implementati 2020-05-06 2020-07-01 2020-12-28 (100 pairs) for operating GPS Quotations Envelope on by FRMD BT-WMD-171275-GO-DIR / Procurement of 40 numbers TF / A6108 Post Direct Selection Direct 1,377.71 32.88 Completed 2020-05-01 2020-05-14 2020-05-06 2020-06-03 2020-06-10 2020-06-03 2020-12-07 2020-11-13 of head light by FRMD BT-WMD-171276-GO-DIR / Procurement of 40 numbers TF / A6108 Post Direct Selection Direct 1,538.00 30.15 Completed 2020-05-01 2020-05-14 2020-05-06 2020-06-03 2020-06-10 2020-06-03 2020-12-07 2020-06-22 of sleeping mat by FRMD BT-WMD-171279-GO-RFQ / Request for Single Stage - One Procurement of Geological TF / A6108 Post Open - National 14,940.00 0.00 Canceled 2020-05-06 2020-07-01 2020-12-28 Quotations Envelope compass and hammer by WMD BT-WMD-173246-GO-DIR / Procurement of field boots for TF / A6108 Post Direct Selection Direct 16,785.00 14,782.20 Signed 2020-05-17 2020-01-23 2020-05-22 2020-06-03 2020-06-26 2020-06-03 2020-12-23 conduct of NFI (250 pairs) by FRMD BT-WMD-173253-GO-DIR / Procurment of 100 numbers TF / A6108 Post Direct Selection Direct 10,588.00 100.54 Completed 2020-05-17 2020-05-25 2020-05-22 2020-06-02 2020-06-26 2020-06-02 2020-12-23 2020-07-22 of 3 men tent for conduct of NFI by FRMD BT-WMD-173249-GO-DIR / Procurment of rain gear (240 TF / A6108 Post Direct Selection Direct 4,046.00 3,711.28 Signed 2020-06-01 2020-03-23 2020-06-06 2020-06-03 2020-07-11 2020-06-03 2021-01-07 numbers ) for conduct of NFI by FRMD BT-WMD-173248-GO-DIR / Procurment of Gumboot for TF / A6108 Post Direct Selection 1,822.00 6.85 Completed 2020-06-01 2020-05-25 2020-06-06 2020-06-03 2020-07-11 2020-06-03 2021-01-07 2020-06-17 conduct of NFI (250 pairs) by FRMD BT-WMD-180696-GO-RFQ / Procurement of 32 inch TV Request for Single Stage - One TF / A6108 Post Open - National 1,000.00 674.32 Completed 2020-06-27 2020-11-18 2020-08-22 2020-11-24 2021-02-18 2021-02-08 screen for the Conference hall Quotations Envelope by WMD BT-WMD-180697-GO-DIR / Procurement of one three in TF / A6108 Post Direct Selection Direct 520.00 285.32 Completed 2020-06-22 2019-12-16 2020-06-27 2020-06-15 2020-08-01 2020-06-15 2021-01-28 2020-06-16 one printer and one printer for WMD by WMD BT-WMD-151980-GO-DIR / Procuement of 210 numbers of each of magnum boot and TF / A6108 Post Direct Selection Direct 10,464.00 0.00 Canceled 2020-01-01 2020-01-06 2020-02-10 2020-08-08 gumboot for NFI field crews by FRMD BT-WMD-118317-GO-DIR / Procurement of 16 water TF / 19030 Post Direct Selection Direct 7,000.00 0.00 Canceled 2019-06-09 2019-06-14 2019-07-19 2020-01-15 proof multi-parameter tester by WMD BT-WMD-173252-GO-DIR / Procurment of 100 numbers TF / A6108 Post Direct Selection 5,858.00 0.00 Canceled 2020-05-17 2020-05-17 2020-05-17 2020-05-17 of two men tent for conduct of NFI by FRMD BT-WMD-148155-GO-RFP / Request for Single Stage - One Procurement of Back pack (18 TF / A6108 Post Open - National 693.00 0.00 Canceled 2019-12-21 2020-02-15 2020-08-13 Quotations Envelope numbers) BT-WMD-104243-GO-RFQ / Procurement of materials for the training on spring shed Request for Single Stage - One revival and management at TF / A6108 Post Limited 4,395.00 0.00 Canceled 2019-03-23 2019-05-18 2019-11-14 Quotations Envelope Lholing watershed, Paro including payment for local experts by WMD BT-WMD-138477-GO-DIR / Procurement of 2 printers (1 TF / A6108 Post Direct Selection Direct 1,000.00 0.00 Canceled 2019-10-14 2019-10-19 2019-11-23 2020-05-21 for Department, 1 for Samtse TFD) by WMD BT-WMD-101015-GO-RFQ / Procurement of 2 GPS, 5 wedge prism and 5 diameter Request for Single Stage - One TF / A6108 Post Limited 1,100.00 0.00 Canceled 2019-03-11 2019-05-06 2019-11-02 tape by Jigme Khesar Strict Quotations Envelope Nature Reserve , DoFPS which is under the workplan of PIU BT-WMD-83259-GO-RFQ / Procurement of one Atrics Request for Single Stage - One measuring system by Ugyen TF / A6108 Post Open - National 10,000.00 0.00 Canceled 2019-01-04 2019-03-01 2019-08-28 Quotations Envelope Wangchuck Institute for Conservation and Environment BT-WMD-200388-GO-DIR / Procurement of 1 number of TF / A6108 Post Direct Selection Direct 15,277.00 13,676.75 Completed 2020-10-22 2020-10-07 2020-10-27 2020-10-21 2020-12-01 2020-10-21 2021-05-30 2021-02-10 S9i Stereomicroscope by UWICER BT-WMD-200831-GO-RFQ / Procurement of 1 number of Request for Single Stage - One TF / A6108 Post Open - National 23,000.00 24,455.93 Completed 2020-10-31 2020-10-23 2020-12-26 2020-12-18 2021-06-24 2021-03-31 Atrics measuring system by Quotations Envelope UWICER Page 6 BT-WMD-207854-GO-RFQ / Procurement of 100 numbers of Open reel fibreglass tape(50 mt), Metric fibric Under Request for Single Stage - One diameter tape model TF / A6108 Post Open - National 11,200.00 0.00 Implementati 2020-12-19 2021-02-13 2021-08-12 Quotations Envelope 283D/20F, 1 meter fabric on foldable rule(5 folds) and turbidity measurement tube by WMD BT-WMD-207856-GO-RFB / Under Procurement of 100 numbers Single Stage - One TF / A6108 Post Request for Bids Open - National 60,400.00 51,624.45 Implementati 2020-12-14 2021-01-02 2020-12-19 2021-01-30 2021-02-01 2021-03-01 2021-02-12 2021-04-05 2021-10-02 of clinometer and geological Envelope on compass by WMD BT-WMD-207857-GO-RFB / Under Single Stage - One Procurement of 100 numbers TF / A6108 Post Request for Bids Open - National 45,000.00 54,654.18 Implementati 2020-12-14 2021-01-02 2020-12-19 2021-01-30 2021-02-01 2021-03-01 2021-02-12 2021-04-05 2021-10-02 Envelope of Handheld GPS by WMD on BT-WMD-207859-GO-RFB / Under Single Stage - One Procurement of 100 numbers TF / A6108 Post Request for Bids Open - National 45,000.00 0.00 Implementati 2020-12-14 2021-01-02 2020-12-19 2021-01-30 2021-02-01 2021-03-01 2021-02-08 2021-04-05 2021-10-02 Envelope of Binoculars by WMD on BT-WMD-207860-GO-RFQ / Under Procurement of 26 numbers Request for Single Stage - One TF / A6108 Post Open - National 27,400.00 26,941.43 Implementati 2020-12-19 2021-02-13 2021-08-12 of handheld soil moisture and Quotations Envelope on temperature sensor by WMD BT-WMD-207861-GO-RFQ / Procurement of 26 numbers Under Request for Single Stage - One of four men tent, 3 numbers TF / A6108 Post Open - National 10,880.00 5,604.68 Implementati 2020-12-19 2021-02-13 2021-08-12 Quotations Envelope of two men tent and 81 on numbers of rucksack bags by WMD BT-WMD-207862-GO-RFQ / Procurement of 30 numbers Under Request for Single Stage - One of Wader boots,81 numbers of TF / A6108 Post Open - National 13,260.00 27,113.33 Implementati 2020-12-19 2021-02-13 2021-08-12 Quotations Envelope field boots and 81 numbers of on rain gears by WMD BT-WMD-207863-GO-RFQ / Under Procurement of 1 number of Request for Single Stage - One TF / A6108 Post Open - National 1,100.00 683.58 Implementati 2020-12-19 2021-02-13 2021-08-12 hot and cold Air conditioner Quotations Envelope on by WMD BT-WMD-208282-GO-RFB / Procurement of 10 numbers Under of Drone and its accessories Single Stage - One TF / A6108 Post Request for Bids Open - National 63,500.00 0.00 Implementati 2020-12-14 2021-01-02 2020-12-19 2021-01-30 2021-02-01 2021-03-01 2021-02-08 2021-04-05 2021-10-02 (Batteries, registration cost, Envelope on software and android tablets) by WMD BT-WMD-212217-GO-DIR / Under Procurement of two numbers TF / A6108 Post Direct Selection Direct 2,250.40 1,162.23 Implementati 2021-01-10 2020-09-24 2021-01-15 2020-11-17 2021-02-19 2021-08-18 of laptops for WMD by WMD on BT-WMD-212219-GO-DIR / Procurement of 24 Desktop Under Computers for the TF / A6108 Post Direct Selection Direct 23,680.00 1,011.92 Implementati 2021-01-10 2019-06-16 2021-01-15 2021-01-26 2021-02-19 2021-08-18 Department for National on Forest Monitoring System by WMD BT-WMD-138485-GO-RFQ / Procurement of 8 hard drives TF / A6108 Post Direct Selection Direct 1,200.00 0.00 Canceled 2019-10-14 2019-10-19 2019-11-23 2020-05-21 (1 TB) for data back up for WMD BT-WMD-134106-GO-RFQ / Procurement of 2 docking Request for Single Stage - One TF / A6108 Post Open - National 1,000.00 0.00 Canceled 2019-09-28 2019-11-23 2020-05-21 stations for Lenovo X1 Carbon Quotations Envelope Laptops BT-WMD-165039-GO-DIR / Procurement of 3 Desktop TF / A6108 Post Direct Selection 1,600.00 0.00 Canceled 2020-03-23 2020-03-23 2020-03-23 2020-03-23 Computer by Samdrup Jongkhar TFD BT-WMD-171273-GO-RFQ / Procurement of video Request for Single Stage - One TF / A6108 Post Open - National 2,000.00 0.00 Canceled 2020-05-06 2020-07-01 2020-12-28 conferencing (65'' TV screen) Quotations Envelope equipment for FRMD by FRMD BT-WMD-200394-GO-RFB / Request for Single Stage - One Procurement of 1 number of TF / A6108 Post Open - National 1,500.00 0.00 Canceled 2020-10-31 2020-12-10 2020-12-26 2021-06-24 Quotations Envelope Desktop Computer by UWICER BT-WMD-83265-GO-RFQ / Procurement of one Lap tops and computer peripherals by Request for Single Stage - One TF / A6108 Post Open - National 3,500.00 0.00 Canceled 2020-01-04 2020-02-29 2020-08-27 Ugyen Wangchuck Institute for Quotations Envelope Conservation and Environment BT-WMD-159767-GO-RFQ / Procurement of dehumidification dry kiln Request for Single Stage - One materials for demonstrating TF / A6108 Post Open - National 3,493.00 0.00 Canceled 2020-04-30 2020-06-25 2020-12-22 Quotations Envelope simple, inexpensive and effective method of drying timbers by UWICER BT-WMD-160091-GO-RFQ / Procurement of Plywood for Request for Single Stage - One TF / A6108 Post Open - National 500.00 0.00 Canceled 2020-06-30 2020-08-25 2021-02-21 dip tank construction by Quotations Envelope UWICER BT-WMD-159765-GO-RFQ / Procurement of Dip tank materials and accessories for Request for Single Stage - One TF / A6108 Post Open - International 2,857.00 0.00 Canceled 2020-04-30 2020-06-25 2020-12-22 demonstration on wood Quotations Envelope preservative addition by UWICER Page 7 BT-WMD-159766-GO-RFQ / Procurement of dehumidifier for demonstrating Request for Single Stage - One TF / A6108 Post Open - National 500.00 0.00 Canceled 2020-04-30 2020-06-25 2020-12-22 dehumidification procedure in Quotations Envelope an enclosed timber chamber by UWICER BT-WMD-160335-GO-DIR / Procurement of training materials (timber logs) for TF / A6108 Post Direct Selection Direct 508.00 0.00 Canceled 2020-02-24 2020-02-29 2020-04-04 2020-10-01 demonstration on wood perservation from NRDCL by UWICER BT-WMD-107038-GO-RFQ / Procurement of 2 laptops for Request for Single Stage - One TF / A6108 Post Limited 3,800.00 0.00 Canceled 2019-04-03 2019-05-29 2019-11-25 Forest Resources Management Quotations Envelope Division, DoFPS BT-WMD-160328-GO-RFQ / Procurement of 3 high Request for Single Stage - One TF / A6108 Post Open - National 7,500.00 0.00 Canceled 2020-02-29 2020-04-25 2020-10-22 specification laptop for use in Quotations Envelope data analysis for NFI by FRMD BT-WMD-151969-GO-DIR / Procurement of Laptop Bag (54 nos) and 64 numbers four TF / A6108 Post Direct Selection Direct 19,533.00 0.00 Canceled 2020-01-01 2020-01-06 2020-02-10 2020-08-08 men tent for conduct of NFI by FRMD BT-WMD-180699-GO-DIR / Procurement of 8 hard drives for data storage for the TF / A6108 Post Direct Selection Direct 500.00 0.00 Canceled 2020-06-22 2020-06-27 2020-08-01 2021-01-28 National Forest Monitoring System by FRMD BT-WMD-171267-GO-DIR / Procurement of 30 android TF / A6108 Post Direct Selection Direct 5,481.40 0.00 Canceled 2020-05-01 2020-05-06 2020-06-10 2020-12-07 tablet for field data collection by FRMD BT-WMD-220032-GO-RFQ / Retendering of the Under Request for Single Stage - One Procurement of 1 number of TF / A6108 Post Open - National 1,500.00 0.00 Implementati 2021-02-27 2021-03-08 2021-04-24 2021-10-21 Quotations Envelope Desktop Computer by UWICER on ( BT-WMD-200394-GO-RFB) BT-WMD-225568-GO-RFQ / Procurement of 600 kgs Pending Request for Single Stage - One Aluminum nails for NFI field TF / A6108 Post Open - National 9,300.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 Quotations Envelope work for tagging trees by on FRMD BT-WMD-225574-GO-RFQ / Pending Procurement of Increment Request for Single Stage - One TF / A6108 Post Open - National 23,000.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 Borer 30 numbers for NFI Quotations Envelope on field work by FRMD BT-WMD-225575-GO-RFQ / Procurement of plastic straws Pending Request for Single Stage - One for collection and TF / A6108 Post Open - National 2,500.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 Quotations Envelope transportation of tree cores on (10000 pieces) by FRMD BT-WMD-225580-GO-RFQ / Procurement of customized Pending name sticker for Labeling of Request for Single Stage - One TF / A6108 Post Open - National 3,100.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 samples (4000 numbers Soil, Quotations Envelope on herb, shrub and litter) for carbon estimation by FRMD BT-WMD-225582-GO-RFQ / Procurement of Pencil and Pending Request for Single Stage - One Sharpener (100 numbers TF / A6108 Post Open - National 320.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 Quotations Envelope each) for recording in NFI field on forms by FRMD BT-WMD-225584-GO-RFQ / Pending Procurement of batteries for Request for Single Stage - One TF / A6108 Post Open - National 2,000.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 metal detector (100 numbers) Quotations Envelope on by FRMD BT-WMD-225587-GO-DIR / Pending Procurement of one laptop by TF / A6108 Post Direct Selection Direct 1,500.00 0.00 Implementati 2021-03-22 2021-03-27 2021-05-01 2021-10-28 FRMD on BT-WMD-225588-GO-RFQ / Procurement of 100 kgs of Pending Request for Single Stage - One Polypropylene bags for TF / A6108 Post Open - National 700.00 0.00 Implementati 2021-03-27 2021-05-22 2021-11-18 Quotations Envelope transportation of carbon on samples by FRMD BT-WMD-237293-GO-DIR / Under Procurement of one number TF / A6108 Post Direct Selection Direct 390.00 390.58 Implementati 2021-06-02 2021-06-22 2021-06-07 2021-06-22 2021-07-12 2022-01-08 of Scanner for the project on accountant by WMD BT-WMD-239202-GO-DIR / Pending Procurement of 1 number of TF / A6108 Post Direct Selection Direct 990.00 0.00 Implementati 2021-06-15 2021-06-20 2021-07-25 2022-01-21 Desktop computer by SFED on BT-WMD-239203-GO-DIR / Pending Procurement of 4 numbers of TF / A6108 Post Direct Selection Direct 2,300.00 0.00 Implementati 2021-06-15 2021-06-20 2021-07-25 2022-01-21 laptops by SFED on BT-WMD-239204-GO-DIR / Pending Procurement of one number TF / A6108 Post Direct Selection Direct 1,200.00 0.00 Implementati 2021-06-15 2021-06-20 2021-07-25 2022-01-21 of projector by SFED on BT-WMD-239205-GO-DIR / Pending Procurement of 3 numbers of TF / A6108 Post Direct Selection Direct 1,600.00 0.00 Implementati 2021-06-15 2021-06-20 2021-07-25 2022-01-21 GPS by SFED on Page 8 BT-WMD-239206-GO-DIR / Procurement of 9 numbers of Pending the external hard drive by TF / A6108 Post Direct Selection Direct 600.00 0.00 Implementati 2021-06-15 2021-06-20 2021-07-25 2022-01-21 FRMD for use in data on management and data backup by FRMD NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-WMD-54249-NC-RFQ / Request for Single Stage - One Workshop wit core working TF / 19030 Post Limited 3,000.00 0.00 Canceled 2018-03-20 2018-05-15 2018-11-11 Quotations Envelope group on FREL BT-WMD-76946-NC-RFQ / Training on LULC using Object Based Image Classification for Request for Single Stage - One TF / A6108 Post Limited 35,294.12 0.00 Canceled 2018-12-05 2018-10-12 2019-01-30 2019-07-29 10 officials Quotations Envelope (ITC, Netherlands) from National Land Commission. BT-WMD-76948-NC-RFQ / Training on MCDA - AHP for Request for Single Stage - One TF / A6108 Post Limited 20,000.00 0.00 Canceled 2019-05-06 2019-05-29 2019-07-01 2019-12-28 8 official in South Korea from Quotations Envelope National Land Commission BT-WMD-76949-NC-RFQ / LULC validation training using GNSS & web based GIS for Request for Single Stage - One surveyors, planners and TF / A6108 Post Limited 37,963.24 0.00 Canceled 2019-06-06 2019-08-01 2020-01-28 Quotations Envelope survey engineers (Singapore) for 15 officials from National Land Commission. BT-WMD-83781-NC-RFQ / Ex-country(overseas location yet to be finalized) capacity building on Carbon budgeting Request for Single Stage - One and allometric equation TF / A6108 Post Limited 7,650.00 0.00 Canceled 2019-01-06 2019-03-03 2019-08-30 Quotations Envelope development for 5 officials from Ugyen Wangchuck Institute for Conservation and Environmental Research BT-WMD-83784-NC-RFQ / Ex-country (overseas location yet to be finalized)capacity building on Dendrochronological Software Request for Single Stage - One TF / A6108 Post Limited 7,650.00 0.00 Canceled 2019-01-07 2019-03-04 2019-08-31 application in tree-ring Quotations Envelope science for 2 Officials from Ugyen Wangchuck Institute for Conservation and Environmental Research BT-WMD-86093-NC-RFQ / Workshop on Project Management and Leadership along with field visits at Industrial Advancement Request for Single Stage - One TF / A6108 Post Limited 23,076.00 868.59 Signed 2018-11-24 2018-12-06 2019-01-19 2018-12-12 2019-07-18 Academy of the Philippines in Quotations Envelope Manila for 10 officials from the SFED and WMD under Department of Forest and Park Services BT-WMD-86094-NC-RFQ / Institutional visit to Community based forest enterprises initiatives along with field visits in Philippines/ Request for Single Stage - One TF / A6108 Post Limited 7,692.00 0.00 Canceled 2019-04-27 2019-06-22 2019-12-19 Indonesia/ Myanmar for 3 Quotations Envelope officials from the Social Forestry & Extension Division under Department of Forest and Park Services BT-WMD-88996-NC-RFQ / Workshop on Environmental Request for Single Stage - One text book for class 9 and 10 TF / 19030 Post Limited 33,000.00 69.35 Completed 2018-12-20 2018-12-23 2019-02-14 2018-12-26 2019-08-13 2019-01-18 Quotations Envelope by Rpyal Education Council (REC) BT-WMD-89246-NC-DIR / Ex-country (European institute )Capacity building on wood based technology for TF / A6108 Post Direct Selection Direct 15,384.60 0.00 Canceled 2019-12-01 2019-12-06 2020-01-10 2020-07-08 one officials from Royal Academy for a period of 3 to 6 months BT-WMD-89941-NC-RFQ / Training workshop on record Request for Single Stage - One TF / 19030 Post Limited 10,000.00 0.00 Canceled 2018-12-19 2019-01-01 2019-02-13 2019-08-12 keeping of procurement and Quotations Envelope budget discussions BT-WMD-94073-NC-DIR / Ex-country study tour at SK incorporation Co. Limited Bangkok for 4 officials from TF / A6108 Post Direct Selection Direct 7,152.00 0.00 Canceled 2019-01-20 2019-01-25 2019-03-01 2019-08-28 Samtse Territorial Field Division under Department of Forest and Park Service Page 9 BT-WMD-92107-NC-DIR / Training on general budget, revenue and public expenditure management through development of multi-face curriculum for TF / A6108 Post Direct Selection Direct 3,278.00 0.00 Canceled 2019-02-18 2019-02-23 2019-03-30 2019-09-26 one Budget Assistant II under Finance Division, Ministry of Agriculture and Forest at South Asian Institute of Technology, Nepal BT-WMD-95972-NC-RFQ / Consultative meeting with Association of Wood Based Industries, NRDCL, BBPL and Forest Divisions to discuss on Request for Single Stage - One guidelines on timber TF / A6108 Post Limited 14,000.00 102.91 Completed 2019-01-30 2019-01-25 2019-03-27 2019-01-29 2019-09-23 2019-02-03 Quotations Envelope extraction and distribution modalities, issuance of forestry clearance for establishment of WBIs by FRMD BT-WMD-95974-NC-RFQ / Visit to 6th International Trade Fair for Furniture Production Technologies, Woodworking Machinery, Request for Single Stage - One TF / A6108 Post Limited 15,000.00 278.05 Completed 2019-02-13 2019-02-25 2019-04-10 2019-02-26 2019-10-07 2019-03-18 Tools, Fittings, Accessories, Quotations Envelope Raw Materials and Products at India expo center and Mart, Greater Noida, India from March 13-16 2019 BT-WMD-95975-NC-RFQ / Visit to ICIMOD Nepal by the field staffs under Tsirang & Dagana Forest Division, Request for Single Stage - One TF / A6108 Post Limited 18,400.00 0.00 Canceled 2019-01-30 2019-03-27 2019-09-23 Department of Forests & Park Quotations Envelope Services to learn on forest management and related issues BT-WMD-95988-NC-DIR / Ex-country training workshop for Development of a National Wetland inventory framework for Bhutan at TF / A6108 Post Direct Selection Direct 30,000.00 0.00 Canceled 2019-02-25 2019-03-02 2019-04-06 2019-10-03 Institute for Land, Water and Society (ILWS) in Oxford, UK for 3 officials from WMD, under Department of Forest and Park Services BT-WMD-96617-NC-RFQ / Budgeting & Accounting Request for Single Stage - One training for one official (REDD TF / A6108 Post Limited 3,790.00 0.00 Canceled 2019-02-20 2019-04-17 2019-10-14 Quotations Envelope plus accountant) from MoAF at Philippines BT-WMD-76947-NC-RFQ / Exchange program/workshop @ Switzerland (given similar Request for Single Stage - One TF / A6108 Post Limited 20,000.00 0.00 Canceled 2019-02-20 2019-04-15 2019-04-17 2019-10-14 landscape with Bhutan) for 8 Quotations Envelope officials from National Land Commission BT-WMD-96029-NC-RFQ / In-house Public consultation meeting for 35 participant and Printing of management plan for developing LFMP Request for Single Stage - One TF / A6108 Post Limited 2,307.00 0.00 Canceled 2019-02-06 2019-04-03 2019-09-30 (Forest inventory for Quotations Envelope assessment of volume, basal area and number of tree per hactare) by Gyelposhing Range Office under Mongar TFD BT-WMD-96024-NC-RFQ / In-country training on NWFP, SLMP and LFMP for 40 farmers Request for Single Stage - One TF / A6108 Post Limited 4,615.00 0.00 Canceled 2019-02-06 2019-04-03 2019-09-30 by Mongar Territorial Field Quotations Envelope Division,under Department of Forest and Park Services. BT-WMD-96026-NC-RFQ / In-country training on power chainsaw operators for 40 farmers at Themnangbi- Request for Single Stage - One TF / A6108 Post Limited 3,077.00 0.00 Canceled 2019-02-06 2019-04-03 2019-09-30 Jaibab watershed by Mongar Quotations Envelope Territorial Field Divsion,under Deparment of Forest and Park Services. BT-WMD-96021-NC-RFQ / Awareness in-country meeting on forest fire, waste management, climate change Request for Single Stage - One and FNCRR 2017 to 20 TF / A6108 Post Limited 1,538.00 0.00 Canceled 2019-02-02 2019-03-30 2019-09-26 Quotations Envelope officials under Mongar Territorial Field Division, under Department of Forest and Park Services. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-WMD-136-CS-INDV / Quality And Cost- consultancy services for TF / 19030 Prior Open - International 108,000.00 0.00 Canceled 2016-06-05 2016-06-26 2016-08-09 2016-09-06 2016-10-06 2016-11-10 2016-12-15 2017-12-15 Based Selection REDD+ study BT-WMD-1790-CS-QBS / Quality Based TF / 19030 Prior Open - International 380,000.00 0.00 Canceled 2016-09-20 2016-10-11 2016-09-22 2016-11-24 2016-12-22 2016-10-17 2017-01-21 2017-09-15 2017-02-20 2017-03-27 2018-03-27 Consultancy on VES Selection Page 10 BT-WMD-2908-CS-QBS / Quality Based Hiring of Consultant for work TF / 19030 Prior Open - International 380,000.00 318,600.00 Signed 2016-10-31 2016-11-21 2016-12-13 2017-01-04 2017-02-01 2017-03-03 2017-09-22 2017-04-02 2017-11-10 2017-05-07 2017-05-18 2018-05-07 Selection on SESA package BT-WMD-2985-CS-QBS / Consultancy work on National Quality Based REDD+ Strategy and Action TF / 19030 Prior Open - International 150,000.00 0.00 Canceled 2016-11-04 2016-11-25 2017-01-08 2016-12-20 2017-02-05 2016-12-25 2017-03-07 2017-04-06 2017-05-11 2018-05-11 Selection Plan, Benefit Sharing and Fund mobilization BT-WMD-4500-CS-QBS / Quality Based TF / 19030 Prior Open - International 380,000.00 214,517.00 Signed 2016-12-13 2016-12-13 2016-12-13 2016-12-13 2016-12-14 2016-12-21 2016-12-19 2017-11-01 2017-01-16 2017-02-28 2018-03-12 Work package on VES Selection BT-WMD-21286-CS-QCBS / Quality And Cost- TF / 19030 Post Open - National 70,000.00 0.00 Canceled 2017-07-24 2017-08-25 2017-08-14 2018-03-06 2017-09-27 2017-10-30 2017-10-25 2018-03-02 2017-11-24 2017-12-29 2018-02-02 2019-02-02 Consultancy on FGRM Based Selection WMD/47/2017-2018/06 / Quality And Cost- Feedback and Grievance TF / 19030 Post Open - National 80,000.00 0.00 Canceled 2017-11-23 2017-08-25 2017-12-14 2018-05-05 2018-01-27 2017-11-20 2018-02-24 2017-12-25 2018-03-26 2018-04-30 2018-06-04 2019-06-04 Based Selection Redress mechanism BT-WMD-52573-CS-FBS / Fixed Budget Project Support Officer for TF / 19030 Post Open - National 20,000.00 0.00 Canceled 2018-03-09 2018-03-30 2018-05-13 2018-06-10 2018-07-10 2018-08-14 2018-09-18 2019-09-18 Selection REDD+ Secretariat BT-WMD-52598-CS-QBS / Quality Based Consultancy work on National TF / 19030 Post Open - International 150,000.00 156,838.00 Signed 2018-03-12 2016-10-25 2018-04-02 2018-03-29 2018-05-16 2016-12-09 2018-06-13 2016-12-25 2018-07-13 2017-01-02 2018-08-12 2017-01-02 2018-09-16 2017-04-24 2019-09-16 Selection REDD+ strategy Package BT-WMD-95517-CS-QCBS / Hiring of consulting firm for the developing the Feedback Quality And Cost- and Grievance redress TF / A6108 Post Open - National 70,000.00 36,693.55 Signed 2019-03-04 2017-07-18 2019-03-25 2019-05-08 2017-10-30 2019-06-05 2017-12-25 2019-07-05 2019-01-07 2019-08-09 2019-01-07 2019-09-13 2019-05-13 2020-09-12 Based Selection Mechanism for REDD+ Program of Bhutan by WMD PIU BT-WMD-104942-CS-QBS / Hire Consultancy Firm to develop Spatial Decision Support System (SDSS) for Quality Based TF / A6108 Post Open - National 150,000.00 0.00 Canceled 2019-03-30 2019-04-20 2019-06-03 2019-07-01 2019-07-31 2019-08-30 2019-10-04 2020-10-03 DoFPS to assist in awarding Selection forestry clearance by Forest Resources Management Division, DoFPS BT-WMD-114391-CS-CQS / Hire Consultancy firm to develop a spatially-enabled knowledge base and a Consultant decision support system to TF / A6108 Prior Qualification Open - International 101,900.00 152,234.00 Signed 2019-06-09 2019-06-28 2019-06-30 2019-07-09 2019-08-13 2019-11-06 2019-09-12 2019-12-03 2019-10-17 2019-12-16 2020-04-14 support DoFPS in issuing Selection forestry clearance in Bhutan by Forest Resource Management Division BT-WMD-138465-CS-CQS / Hiring of consultancy for Consultant carrying out assessment of TF / A6108 Post Qualification Open - National 23,076.92 0.00 Canceled 2019-10-14 2019-11-04 2019-12-18 2020-01-17 2020-02-21 2020-08-19 plantations in the Country by Selection SFED BT-WMD-89244-CS-QCBS / Hire consultant to conduct Consultant cost benefit analysis on TF / A6108 Post Qualification Open - National 8,307.70 0.00 Canceled 2019-12-01 2020-12-12 2019-12-22 2020-02-04 2020-03-05 2020-04-09 2020-10-06 Glulam & develop marketing Selection strategies by Royal Academy BT-WMD-169084-CS-CQS / Hiring of Consultancy for the Consultant development of Investment TF / A6108 Prior Qualification Open - National 80,000.00 96,790.83 Signed 2020-04-23 2020-05-02 2020-05-14 2020-05-04 2020-06-27 2020-10-02 2020-07-27 2020-10-09 2020-08-31 2020-11-03 2021-02-27 and Implementation Plan for Selection the National REDD+ Strategy & Action Plan of Bhutan BT-WMD-101028-CS-QCBS / Hiring of consultants for development of Green design Quality And Cost- TF / A6108 Post Open - National 36,153.85 0.00 Canceled 2019-05-15 2019-06-05 2019-07-19 2019-08-16 2019-09-15 2019-10-20 2019-11-24 2020-11-23 for DoFPS Buildings by Forest Based Selection Protection and Enforcement Division, DoFPS PIU BT-WMD-231616-CS-QCBS / Development of the Online Quality And Cost- Forestry Clearance and Permit TF / A6108 Post Open - National 26,700.00 0.00 Canceled 2021-05-02 2021-05-06 2021-05-23 2021-07-06 2021-08-03 2021-09-02 2021-10-07 2021-11-11 2022-11-11 Based Selection System for the Department of Forests & Park Services BT-WMD-234279-CS-CQS / Development of the Online Consultant Under Forestry Clearance and Permit TF / A6108 Post Qualification Open - National 26,700.00 0.00 2021-05-14 2021-05-17 2021-06-04 2021-07-18 2021-06-09 2021-08-17 2021-09-21 2022-03-20 Implementation System for the Department of Selection Forests and Park Services INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-WMD-137-CS-INDV / Individual Consultancy work on Drivers TF / 19030 Prior Consultant Open - National 130,000.00 130,125.00 Completed 2016-05-31 2016-05-31 2016-06-01 2016-06-05 2016-09-26 2016-07-10 2016-06-08 2017-01-06 2017-01-30 study. Selection BT-WMD-1470-CS-CDS / Sole sourcing of FAO to develop FREL/MRV for FCPF TF / 19030 Prior Direct Selection Direct 210,000.00 260,500.00 Signed 2016-09-09 2016-09-19 2016-09-25 2016-11-23 2017-03-16 2017-05-22 REDD+ Readiness Program of Bhutan Page 11 BT-WMD-21669-CS-INDV / Individual Legal Consultant (National) for TF / 19030 Post Consultant Open 15,000.00 11,572.70 Completed 2017-07-24 2017-05-23 2017-09-11 2017-07-19 2017-10-02 2017-07-27 2017-11-06 2017-07-28 2018-05-05 2017-12-30 Safeguards Selection FRMD/R-PP/NFI/3/2017- 2018/01 / Hiring of Experts Individual for production of National TF / 19030 Post Consultant Direct 9,230.76 0.00 Canceled 2018-03-30 2018-04-09 2018-04-30 2018-06-04 2018-12-01 Forestry Inventory report Selection Volume II BT-WMD-2378-CS-INDV / Individual Consultancy on Grievance TF / 19030 Post Consultant Open 13,707.00 0.00 Canceled 2016-11-01 2016-10-07 2016-12-20 2017-01-10 2017-02-14 2017-08-13 Redress Mechanism for Selection REDD+ BT-WMD-66637-CS-INDV / Hiring of a National Individual Consultant for evaluation & TF / A6108 Post Consultant Open 26,000.00 22,816.40 Completed 2018-06-19 2018-08-07 2018-08-02 2018-08-28 2018-08-14 2018-10-02 2018-09-13 2019-03-31 2019-07-09 revision of National Selection Community Forestry Strategy BT-WMD-71254-CS-INDV / Hiring of a National Consultant for review and Individual revision of National Strategy TF / A6108 Post Consultant Limited 30,000.00 16,711.93 Completed 2018-08-01 2018-08-30 2018-08-06 2018-10-19 2018-08-27 2018-11-23 2018-10-01 2018-11-27 2019-03-30 2019-10-31 for the development of Non- Selection wood forest products in Bhutan BT-WMD-75647-CS-INDV / "Hiring of Consultant for the Individual evaluation and revision of the TF / A6108 Post Consultant Limited 30,000.00 16,754.39 Completed 2018-09-15 2018-11-16 2018-09-20 2019-01-09 2018-10-11 2019-01-21 2018-11-15 2019-02-20 2019-05-14 2019-09-26 National Plantation Strategy Selection for Bhutan, 2010" by Social Forestry Extension Division BT-WMD-89240-CS-CDS / Hire experts to conduct onsite Under TF / A6108 Post Direct Selection Direct 35,076.00 0.00 2019-01-01 2019-08-30 2019-01-11 2019-03-17 2019-09-13 training on joinery and Implementation erections by Royal Academy BT-WMD-101029-CS-CDS / Hiring of consultants (Green e- solution) to enhance the TF / A6108 Post Direct Selection Direct 8,560.31 5,782.85 Signed 2019-02-25 2019-02-26 2019-03-07 2019-02-26 2019-05-11 2019-04-01 2019-11-07 FIRMS by Forest Resources Management Division,DoFPS PIU BT-WMD-142190-CS-INDV / Hiring of consultancy for Individual carrying out Impact TF / A6108 Post Consultant Open 14,085.00 15,618.16 Completed 2019-11-04 2019-11-12 2019-12-23 2020-02-12 2020-01-13 2020-03-02 2020-02-17 2020-03-10 2020-08-15 2020-06-16 Assessment of Forest Selection Plantations in the Country by SFED BT-WMD-101032-CS-INDV / Hiring of individual consultant Individual to carry out Gender TF / A6108 Post Consultant Open 20,000.00 0.00 Canceled 2019-05-02 2019-06-20 2019-07-11 2019-08-15 2020-02-11 assessment and action plan Selection by WMD BT-WMD-101034-CS-INDV / Hiring of two individual Individual consultants to develop TF / A6108 Post Consultant Open 50,000.00 0.00 Canceled 2019-05-02 2019-06-20 2019-07-11 2019-08-15 2020-02-11 proposal for mobilizing fund Selection for REDD+ Strategy implementation by WMD BT-WMD-105276-CS-CDS / Hiring consultant Professor Timothy Gordon Gregoire from Yale University, USA for a period of 3-6 months, to TF / A6108 Post Direct Selection Direct 17,000.00 0.00 Canceled 2019-03-20 2019-03-30 2019-06-03 2019-11-30 provide technical assistance and development of re measurement guidelines for plots unable to relocate in future inventory by FRMD BT-WMD-101059-CS-INDV / Hiring of one National Legal Individual Consultant to support TF / 19030 Post Consultant Open 15,000.00 0.00 Canceled 2019-02-28 2017-05-01 2019-04-18 2019-05-09 2019-06-13 2019-12-10 international consultancy Selection work om SESA and ESMF by WMD BT-WMD-208283-CS-INDV / Hire of consultant to conduct Individual Under cost benefit analysis on TF / A6108 Post Consultant Open 18,000.00 11,486.63 2020-12-14 2021-02-18 2021-02-01 2021-01-05 2021-02-22 2021-01-12 2021-03-29 2021-09-25 Implementation Glulam & develop marketing Selection strategies by Royal Academy BT-WMD-101024-CS-CDS / Hiring of services of two experts from United State Department of Agriculture (USDA), Forest Service and TF / A6108 Post Direct Selection Direct 14,054.00 0.00 Canceled 2019-05-21 2019-05-31 2019-08-04 2020-01-31 Red Castle Resource to develop SOP for MTBS by Forest Protection and Enhancement Division, DoFPS PIU BT-WMD-159764-CS-CDS / Hire expert to conduct onsite training wood preservation or TF / A6108 Post Direct Selection Direct 8,572.00 0.00 Canceled 2020-03-31 2020-04-10 2020-06-14 2020-12-11 onsite training on use of less preferred timber species by UWICER Page 12 Nigeria For Women Project PROCUREMENT PLAN (Textual Part) Project information: [Nigeria] [Nigeria For Women Project] P161364] Project Implementation agency: [Federal Ministry of Women Affairs and Social Development] Date of the Procurement Plan: [August 31, 2018] Period covered by this Procurement Plan: [August 31,2018 to December 2019] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works).Not Applicable. Goods: is not applicable Works: is not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable Other Relevant Procurement Information. The project will use the CDD procurement under this project. CDD manual will be produced by the project. PROCUREMENT Nigeria : Nigeria For Women Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2020-08-31 2021-05-15 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161364 GPN Date: Project Name: Nigeria For Women Project Loan / Credit No: IDA / 62710 Nigeria for Women Project - Abia State Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Management, AB/NFWP/GO/NS/20/01 / Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 540.54 540.54 Signed 2020-09-02 2020-12-07 2020-10-01 2021-01-05 2020-11-30 Procurement of Stationeries Quotations Envelope and Learning AB/NFWP/GO/NS/20/02 / Production and supply of Project Management, Financial Management Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 1,216.00 1,216.00 Signed 2020-09-14 2020-12-07 2020-11-09 2020-12-24 2021-01-08 documents and materials, Quotations Envelope and Learning Letterheads, Staff ID Cards and Business Cards AB/NFWP/GO/NS/20/04 / Project Management, Request for Single Stage - One Procurement of Automated IDA / 62710 Monitoring and Evaluation Post Limited 3,243.24 0.00 Canceled 2020-09-26 2020-11-21 2021-01-20 Quotations Envelope Accounting Software and Learning NG-NFWP-ABIA STATE- Project Management, Request for Single Stage - One 207509-GO-RFQ / IDA / 62710 Monitoring and Evaluation Post Limited 69,252.00 69,252.00 Signed 2020-12-21 2020-12-23 2021-02-15 2021-01-11 2021-08-14 Quotations Envelope Procurement of 16 Seater Bus and Learning NG-NFWP-ABIA STATE- 207536-GO-RFQ / Project Management, Request for Single Stage - One Procurement of Android IDA / 62710 Monitoring and Evaluation Post Limited 32,909.00 32,909.00 Signed 2020-12-21 2020-12-22 2021-02-15 2021-01-13 2021-08-14 Quotations Envelope Tablets for Ward Facilitators and Learning and Local Field Officers. NG-NFWP-ABIA STATE- Project Management, 209409-GO-DIR / IDA / 62710 Monitoring and Evaluation Post Direct Selection Direct 3,324.00 3,324.00 Signed 2020-12-18 2020-12-19 2020-12-23 2020-12-24 2021-01-27 2020-10-20 2021-07-26 Procurement of Flexible and Learning Accounting Software NG-NFWP-ABIA STATE- 214358-GO-RFQ / Request for Single Stage - One Procurement 1000 units of IDA / 62710 Building Social Capital Post Limited 55,402.00 55,402.00 Signed 2021-01-26 2021-01-26 2021-03-23 2021-02-18 2021-09-19 Quotations Envelope Savings Kit for Women Affinity Groups (Phase 1) NG-NFWP-ABIA STATE- 214359-GO-RFQ / Procurement of COVID-19 Preventive items for the SPCU and Women Affinity Groups Request for Single Stage - One IDA / 62710 Building Social Capital Post Limited 56,866.00 0.00 Canceled 2021-01-26 2021-01-26 2021-03-23 2021-09-19 (Handheld Thermometers, Quotations Envelope Cloth reusable nose masks, Hand-washing buckets with taps, Hand-washing Liquid, Hand Sanitizer) NG-NFWP-ABIA STATE- Project Management, 222334-GO-RFQ / Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 831.00 831.00 Signed 2021-03-10 2021-02-18 2021-05-05 2021-03-18 2021-11-01 Procurement of Stationeries Quotations Envelope and Learning for SPCU Office NG-NFWP-ABIA STATE- 222339-GO-RFQ / Procurement of ICT and Accessories (Additional Project Management, Under Request for Single Stage - One Rechargeable Fans for SPCU, IDA / 62710 Monitoring and Evaluation Post Limited 3,615.00 0.00 Implementati 2021-03-17 2021-05-21 2021-05-12 2021-11-08 Quotations Envelope Desktop Computer sets and and Learning on UPS for the Ministry of Women Affairs and Social Development, Abia State) NG-NFWP-ABIA STATE- 222348-GO-RFQ / Project Management, Under Procurement of Additional Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 4,981.00 0.00 Implementati 2021-03-17 2021-05-12 2021-11-08 Furniture and utencils (Tables, Quotations Envelope and Learning on Chairs, Shelves and Kitchen utencils) NG-NFWP-ABIA STATE- 226641-GO-RFQ / Procurement of COVID-19 preventive items for the WAGs and SPCU (Handheld Request for Single Stage - One IDA / 62710 Building Social Capital Post Limited 87,844.00 87,844.00 Signed 2021-04-02 2021-03-31 2021-05-28 2021-04-28 2021-11-24 Thermometers, Cloth reusable Quotations Envelope nose masks, Hand-washing buckets with taps, Hand- washing Liquid, Hand Sanitizer) NG-NFWP-ABIA STATE- 234263-GO-RFQ / Project Management, Under Request for Single Stage - One Procurement of Laptops for IDA / 62710 Monitoring and Evaluation Post Limited 13,684.00 0.00 Implementati 2021-05-22 2021-05-21 2021-07-17 2022-01-13 Quotations Envelope Advisers, Anchors, and and Learning on Finance Officer Page 1 NG-NFWP-ABIA STATE- Under 234264-GO-DIR / IDA / 62710 Building Social Capital Post Direct Selection Direct 51,474.00 51,474.00 Implementati 2021-05-17 2021-05-17 2021-05-22 2021-05-21 2021-06-26 2021-12-23 Procurement of additional 163 on Android Tablets NG-NFWP-ABIA STATE- 234265-GO-DIR / Under Procurement of additional IDA / 62710 Building Social Capital Post Direct Selection Direct 54,737.00 0.00 Implementati 2021-05-17 2021-05-17 2021-05-22 2021-05-21 2021-06-26 2021-12-23 1040 units of Savings Kit for on Women Affinity Groups NG-NFWP-ABIA STATE- Project Management, Under 236758-GO-RFQ / Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 132,895.00 0.00 Implementati 2021-06-02 2021-06-02 2021-07-28 2022-01-24 Procurement of two Pickup Quotations Envelope and Learning on Vans for the SPCU NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-NFWP-ABIA STATE- Project Management, 216029-NC-RFQ / Insurance Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 6,510.00 6,510.00 Signed 2021-02-03 2021-01-29 2021-03-24 2021-02-19 2021-09-20 of two SPCU Vehicles (Hilux Quotations Envelope and Learning Van and Bus) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-NFWP-ABIA STATE- Project Management, Individual 229460-CS-INDV / IDA / 62710 Monitoring and Evaluation Post Consultant Direct 37,895.00 37,895.00 Signed 2021-04-22 2021-04-22 2021-04-23 2021-04-23 2021-04-30 2021-04-30 2021-05-06 2021-05-06 2022-05-06 Engagement of Project and Learning Selection Coordinator NG-NFWP-ABIA STATE- Project Management, 230678-CS-CDS / Under IDA / 62710 Monitoring and Evaluation Post Direct Selection Direct 5,263.00 5,263.00 2021-04-26 2021-04-26 2021-04-27 2021-06-07 2021-05-07 2021-11-03 Engagement of External Implementation and Learning Auditors NG-NFWP-ABIA STATE- Project Management, Individual 237675-CS-INDV / IDA / 62710 Monitoring and Evaluation Post Consultant Limited 18,947.37 0.00 Under Review 2021-06-08 2021-06-08 2021-06-10 2021-06-25 2021-06-29 2022-05-31 Engagement of Master Trainer and Learning Selection 1 NG-NFWP-ABIA STATE- Project Management, Individual 238007-CS-INDV / IDA / 62710 Monitoring and Evaluation Post Consultant Limited 18,947.37 0.00 Under Review 2021-06-08 2021-06-08 2021-06-10 2021-06-25 2021-06-29 2022-05-31 Engagement of Master Trainer and Learning Selection 2 Page 2 MINISTERE DE REPUBLIQUE DE COTE D’IVOIRE L’ENVIRONNEMENT Union Discipline travail ET DU DEVELOPPEMENT --------------- DURABLE --------------- PROJET DE GESTION DES PESTICIDES OBSOLETES EN CÔTE D’IVOIRE UNITE INTEGREE D’ADMINISTRATION DES PROJETS (UIAP) ………………………………………………………. Plan de Passation des Marchés I. GÉNÉRALITÉS 1.1. Informations générales sur le projet Pays: République de Côte d’Ivoire Emprunteur : Gouvernement de Côte d’Ivoire Nom du Projet : Projet de Gestion des Pesticides obsolètes en côte d’Ivoire (PROGEP-CI) Numéros du Don : TF 0A0742 Identifiant du projet : P131778 Montant du Don : 7 000 000 $ US Unité de Gestion du Projet : Unité Intégrée d’Administration des projets (UIAP) 1.2 Date d’approbation du plan de passation de marchés Plan original : 20 octobre 2015 Révision 1 : 14-04-2016 Révision 2 : 19-10-2016 Révision 3 : 27 mars 2017 Révision 4 : 11 Juillet 2017 Révision 5 : ….au 31 décembre 2017 1.3 Date de publication de l’avis général de passation de marchés : dans UNDB et DgMarket 1.4 Période couverte par le Plan de passation des marchés : ……… au 31 décembre 2017 2.1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions de l'Annexe 1 des Directives de passation de marchés de janvier 2011, révisé en juillet 2014 : Nouveaux seuils de revue de la Banque élaborés en décembre 2012 et proposés au Gouvernement le 05 décembre 2012, révisés en juillet 2016 et liés au niveau de risque du projet. Nature des Méthode de passation Valeur seuil Contrats soumis à dépenses de marchés du marché examen préalable $EU de l’IDA 1. Travaux AOI ≥ 10,000,000 (y compris clés en Tous les contrats de AON < 10,000,000 main, Fourniture et 15.000.000 $EU et Demande de cotation – < 200,000 plus montage au moins 3 offres d’installations et Entente Directe (*) Pas de seuil Contrats ≥ 100,000 PPP) 2. Fournitures, AOI ≥ 1,000,000 Systèmes AON < 1,000,000 d’Informations et Consultation de Services autres Fournisseurs à l’échelle que les services < 100,000 Tous les contrats de Nationale - Au moins 3 de Consultants offres 4.000.000 $EU et Consultation de plus Fournisseurs à l’échelle Nationale - Au moins 3 < 500 000 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil Contrats ≥ 100,000 (*) Le justificatif de toute entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 2.2. Pré qualification : Les soumissionnaires pour (Nature des fournitures) devront être pré-qualifiés suivant les dispositions des paragraphes 2.9 et 2.10 des Directives : N/A 2.3. Procédures applicables aux Composantes relatives au Développement Conduit par les Communautés (en relation avec le paragraphe 3.17 des Directives) : N/A 2.4. Référence (si nécessaire) au Manuel opérationnel/de passation de marchés : Manuel opérationnel (En cours de validation). 2.5. Autres arrangements spécifiques pour la passation de marchés : N/A 2.6. Marchés, planning et Méthode de passation 3.2.1 Type de marchés : Fournitures et travaux 1 2 3 4 5 6 7 8 Méthode Préférence Exam. Coût estimé passation P-Q Ouverture Liste des ensembles de marchés fournisseur par Marchés plis prévue s locaux Banque Commentaire BAILLEURS A priori/A N° Description ($EU) OUI/NON OUI/NON Date prévue posteriori TRAVAUX - - - - - - - - SOUS-TOTAL TRAVAUX PROGEP-CI - FOURNITURES (BIENS) Acquisition d’ordinateurs pour les Marché exécuté En A attente de 33 superviseurs et de tablettes 1 96, 962 CFN Non Non posterior 12/04/2017 paiement pour les 113 agents d’inventaire et i d’un serveur Acquisition de quatre (04) véhicules en Marché exécuté En A soutien aux opérations d’inventaire et attente de 2 230,000 CFN Non Non posterior 12/09/2017 aux activités de communication et paiement i pour le Pôle d'excellence A Marché exécuté En 3 Acquisition de mobilier de bureau 40,000 CFN Non Non posterior 03/09/2017 attente de i paiement A Acquisition de 175 fûts en plastique 4 40,000 CFN Non Non posterior 20/05/2018 Processus en cours pour le stockage des EPI utilisés i Contrat avec la société CALLIVOIRE En attente de 5 pour la fourniture de 20 000 224,000 ED Non Non A priori NA paiement combinaisons jetables Fourniture de supports (y compris conception) du livré des appels à A 6 communication, prospectus et autres 30,000 CFN Non Non posterior 03/11/2017 Processus en cours supports dans le cadre des Journées i scientifiques sur les pesticides 3 SOUS-TOTAL FOURNITURES 660,96 PROGEP-CI (millier $) SERVICES ASSIMILES- PROGEPCI Contrat avec GROUPE SOUNGARI Contrat signé. PUBLICITE (GSP) pour la conception de Prestation en cours 10 20, 000 ED Non Non A priori NA d’exécution sketchs et prestation d’artistes comédiens pendant la caravane Convention avec l’Union des Radios de Proximité de CI (URPCI) pour diffusion Prestation en cours 12 40, 000 ED Non Non A priori NA des contenus des spots et sketchs et d’exécution annonces Contrat avec la Radiodiffusion Télévision Ivoirienne (RTI) pour la Contrat conclu et en 13 100, 000 ED Non Non A Priori NA coproduction pour la diffusion des cours d’exécution contenus audiovisuels SOUS-TOTAL SERVICES ASSIMILES- 160,000 PROGEP-CI Taux de change utilisé : 1 $ EU= 500 F CFA 4 III. Sélection de Consultants 3.1. Seuil d’examen préalable Les contrats qui seront soumis à l'examen préalable de la Banque conformément aux dispositions de l'Annexe 1 des Directives de Sélection et Emploi de Consultants de janvier 2011 révisées en juillet 2014: Nature de Méthode de passation de Valeur Contrats soumis à dépenses marchés seuil du examen préalable contrat $EU Consultant SFQC1, SFQ2, SMC3, SCBD4, ≥ 300.000 s Tout contrat de 2.000.000 Firmes SFQC, SFQ, SMC, SCBD, QC5 < 300.000 $EU ou plus Contrat ≥ 100,000 Entente directe (*) Pas de seuil Et Audit financier Consultant Consultant individuel (AMI) ≥ 100.000 Tout contrat de 100.000 $ s EU ou plus Individuels Consultant individuel (3 CV) < 100.000 Contrat ≥ 100,000 Entente directe (*) Pas de seuil Et personnel permanent du projet Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. (*) Le justificatif de toute sélection par entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 3.2. Liste restreinte composée entièrement de Consultants Nationaux : Liste restreinte de consultants pour prestations de services, d’un coût estimatif inférieur à 300 000$ US ou équivalent par contrat, peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants 3.3. Autres arrangements spécifiques pour la sélection : Le recrutement d’un Assistant Technique à la Coordination sera effectué selon la méthode de sélection de consultant individuel. 1 SFQC : Sélection Fondée sur la Qualité et le Coût 2 SFQ : Sélection fondée sur la qualité 3 SMC : Sélection au moindre coût 4 SCBD : Sélection dans le cadre d’un budget déterminé 5 QC : Sélection basée sur les Qualifications des Consultants CI : Consultant Individuel : AMI : Avis à Manifestation d’Intérêt Prestation de services de consultants 1 2 3 4 5 6 Liste des ensembles de contrats / Description Coût estimé Méthode Ouverture Examen BM de la mission BAILLEUR sélection des offres Commentaire (Millier de Priori / A No. Description de la mission Date prévue $EU) Posteriori CONSULTANTS- PROGEP-CI Contrat avec le cabinet BEERA pour la Contrat en cours conception des fiches d'inventaire d’exécution numériques des pesticides obsolète, la 2 146, 778 ED A priori NA création d'une base de données des pesticides et l’encadrement des agents d’inventaires Contrat avec l’Expert AMMATI pour la Contrat en cours 3 formation sur les techniques d’inventaire 65, 220 ED A Priori NA d’exécution et le PSMS Contrat avec BAMASOFT NETWORK pour la conception (adaptation) et l’installation 60, 110 Contrat en cours 4 ED A priori NA de l’application en ligne « RUCHE » pour le d’exécution suivi-évaluation de l'UIAP SOUS- TOTAL CONSULTANTS PROGEP- 272 108 CI 6 PROCUREMENT Cote d'Ivoire : Obsolete Pesticides Management Project PLAN General Information Country: Cote d'Ivoire Bank’s Approval Date of the Original Procurement Plan: 2018-05-21 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P131778 GPN Date: Project Name: Obsolete Pesticides Management Project Loan / Credit No: TF / A0742, TF / 15059 Obsolete Pesticides Management Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-PROCEP-CI-65033-CW- RFQ / Réhabilitation de deux Regulatory and institutional Request for Single Stage - One 2018-12- TF / A0742 Post Limited 30,000.00 0.00 Canceled 2018-08-24 2018-10-08 (2) sites de stockages framework Quotations Envelope 07 provisoires GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PROCEP-CI-60092-GO- DIR / Contrat avec la société CALLIVOIRE pour la fourniture Management of obsolete de 20 000 combinaisons TF / A0742 pesticides and associated Prior Direct Selection Direct 224,200.00 0.00 Canceled 2017-11-14 2018-06-05 2017-11-17 2017-11-27 2017-12-27 jetables en pour les wastes superviseurs et agents d'inventaire CI-PROCEP-CI-60089-GO- Regulatory and institutional Request for Single Stage - One RFQ / CASA-1000 Working TF / A0742 Post Limited 230,000.00 0.00 Canceled 2017-09-04 2017-10-13 2017-11-12 framework Quotations Envelope Group Administrator CI-PROCEP-CI-65485-GO- Management of obsolete DIR / Contrat avec VIVO TF / A0742 pesticides and associated Prior Direct Selection Direct 136,000.00 0.00 Canceled 2018-06-15 2018-06-18 2018-06-26 2018-12-23 ENERGY pour la fourniture de wastes carburant CI-PROCEP-CI-65498-GO- DIR / Contrat avec TOTAL CI Regulatory and institutional TF / A0742 Post Direct Selection Direct 60,000.00 0.00 Canceled 2018-06-17 2018-06-22 2018-07-16 2018-11-30 pour la fourniture de framework carburant CI-PROCEP-CI-65287-GO- Management of obsolete Request for Single Stage - One RFQ / Acquisition de TF / A0742 pesticides and associated Post Limited 30,000.00 0.00 Canceled 2018-06-20 2018-07-08 2018-07-31 Quotations Envelope conteneurs wastes Management of obsolete CI-PROCEP-CI-65283-GO- Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 40,000.00 0.00 Canceled 2018-06-20 2018-07-10 2018-11-30 RFQ / Fournitures de bureau Quotations Envelope wastes CI-PROCEP-CI-38764-GO- RFQ / Conception et édition du livré des appels à Promotion of alternatives to Request for Single Stage - One communication, prospectus et TF / A0742 Post Limited 30,000.00 0.00 Canceled 2018-08-25 2018-09-23 2018-10-23 chemical pesticides Quotations Envelope autres supports dans le cadre des Journées scientifiques sur les pesticides CI-PROCEP-CI-60087-GO- Management of obsolete Pending RFQ / Acquisition de 175 fûts Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 40,000.00 0.00 Implementati 2018-06-21 2018-07-20 2018-08-21 en plastique pour le stockage Quotations Envelope wastes on des EPI utilisés CI-PROCEP-CI-60103-GO- Management of obsolete Request for Single Stage - One RFP / Acquisition de matériels TF / A0742 pesticides and associated Post Limited 22,000.00 0.00 Canceled 2018-07-02 2018-07-04 2018-07-19 2018-07-21 2018-07-31 2018-08-30 Proposals Envelope informatiques wastes CI-PROCEP-CI-66529-GO- Management of obsolete Request for Single Stage - One RFQ / Acquisition de TF / A0742 pesticides and associated Post Limited 20,000.00 0.00 Canceled 2018-07-02 2018-08-06 2018-08-27 Quotations Envelope consommables informatiques wastes CI-PROCEP-CI-60101-GO- Request for Single Stage - One RFQ / Acquisition de Mobiliers TF / A0742 Project management Post Limited 40,000.00 0.00 Canceled 2017-10-04 2017-10-19 2017-11-03 Quotations Envelope et matériels de bureau CI-PROCEP-CI-108353-GO- RFQ / Acquisition d'un Promotion of alternatives to Request for Single Stage - One TF / A0742 Post Open - National 50,000.00 0.00 Canceled 2019-04-16 2019-05-06 2019-06-05 véhicule de type 4x4 double chemical pesticides Quotations Envelope cabine CI-PROCEP-CI-108354-GO- Promotion of alternatives to Request for Single Stage - One RFQ / Acquisition de 3 motos TF / A0742 Post Open - National 15,000.00 0.00 Canceled 2019-04-14 2019-04-26 2019-04-30 chemical pesticides Quotations Envelope pour les champs pilotes CI-PROCEP-CI-108523-GO- Promotion of alternatives to Request for Single Stage - One RFQ / Acquisition de 02 TF / A0742 Post Open - National 4,000.00 0.00 Canceled 2019-04-20 2019-05-24 2019-05-27 chemical pesticides Quotations Envelope ordinateurs portables CI-PROCEP-CI-108525-GO- DIR / Contrat avec VIVO Regulatory and institutional TF / A0742 Post Direct Selection Direct 20,000.00 0.00 Canceled 2019-04-10 2019-04-15 2019-04-26 2019-04-29 ENRGY pour la fourniture de framework carburant CI-PROCEP-CI-211445-GO- Pending RFQ / ACQUISITION DE KITS Request for Single Stage - One TF / 15059 Project management Post Open - National 25,000.00 0.00 Implementati 2021-01-03 2021-02-28 2021-08-27 DE PROTECTION SANITAIRE Quotations Envelope on CONTRE LE COVID-19 Page 1 CI-PROCEP-CI-234320-GO- Pending RFQ / ACQUISITION Promotion of alternatives to Request for Single Stage - One TF / A0742 Post Limited 70,000.00 0.00 Implementati 2021-05-26 2021-06-10 2021-06-25 D'EQUIPEMENTS DE chemical pesticides Quotations Envelope on LABORATOIRE CI-PROCEP-CI-234325-GO- Pending Promotion of alternatives to Request for Single Stage - One RFQ / Acquisition de verrerie TF / A0742 Post Limited 80,000.00 0.00 Implementati 2021-05-26 2021-06-09 2021-06-23 chemical pesticides Quotations Envelope et d'accessoires d'analyse on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PROCEP-CI-60124-NC- DIR / Contrat avec la RTI pour Promotion of alternatives to la coproduction pour la TF / A0742 Prior Direct Selection Direct 100,000.00 0.00 Canceled 2017-09-25 2017-09-30 2017-10-13 2018-04-11 chemical pesticides diffusion des contenus audiovisuels CI-PROCEP-CI-65643-NC- Management of obsolete DIR / Assurance des motos Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 4,000.00 0.00 Canceled 2018-06-15 2018-07-04 2018-12-31 pour la réalisation de Quotations Envelope wastes l'inventaire CI-PROCEP-CI-65680-NC- RFQ / Conception et Regulatory and institutional Request for Single Stage - One TF / A0742 Post Limited 40,000.00 0.00 Canceled 2018-07-05 2018-07-28 2018-12-31 production de supports de framework Quotations Envelope sensibilisation CI-PROCEP-CI-65636-NC- DIR / Contrat avec ORANGE CI pour la fourniture de de crédit Management of obsolete de communication mensuelle TF / A0742 pesticides and associated Post Direct Selection Direct 76,000.00 0.00 Canceled 2018-06-18 2018-06-20 2018-06-29 2018-12-22 et de recharge data sur la wastes période de l'inventaire l'inventaire CI-PROCEP-CI-65682-NC- Management of obsolete DIR / Contrat avec CFAO pour TF / A0742 pesticides and associated Post Direct Selection Direct 45,000.00 0.00 Canceled 2018-06-14 2018-06-17 2018-07-01 2018-12-31 l'entretien et la réparation des wastes véhicules CI-PROCEP-CI-65683-NC- DIR / Contrat avec TRACTAFRIC MOTORS Promotion of alternatives to TF / A0742 Post Direct Selection Direct 10,000.00 0.00 Canceled 2018-06-14 2018-06-15 2018-06-29 2018-12-31 (AFRICAUTO) pour la chemical pesticides réparation des véhicules HYUNDAI et MAZDA CI-PROCEP-CI-65778-NC- Under Promotion of alternatives to Request for Single Stage - One RFQ / Production d'une revue TF / A0742 Post Limited 6,000.00 0.00 Implementati 2018-07-06 2018-08-27 2018-07-26 2018-12-31 chemical pesticides Quotations Envelope semestrielle spécialisée on CI-PROCEP-CI-65783-NC- Promotion of alternatives to Request for Single Stage - One RFQ / Production de supports TF / A0742 Post Limited 40,000.00 0.00 Canceled 2018-07-13 2018-08-13 2018-12-31 chemical pesticides Quotations Envelope de communication CI-PROCEP-CI-65786-NC- RFQ / Production de gadgets Regulatory and institutional Request for Single Stage - One TF / A0742 Post Limited 30,000.00 0.00 Canceled 2018-08-28 2018-10-12 2018-12-19 et autres supports de fin de framework Quotations Envelope fin dannée CI-PROCEP-CI-65775-NC- Promotion of alternatives to Request for Single Stage - One RFQ / Maintenance et TF / A0742 Post Limited 6,000.00 0.00 Canceled 2018-07-18 2018-08-05 2018-12-31 chemical pesticides Quotations Envelope promotion du site internet CI-PROCEP-CI-66551-NC- Management of obsolete RFQ / Collecte et transport Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 60,000.00 0.00 Canceled 2018-09-16 2018-11-01 2018-12-31 des PODA vers les sites de Quotations Envelope wastes stockage provisoire CI-PROCEP-CI-66749-NC- Management of obsolete RFQ / Assurance multirisques Request for Single Stage - One TF / A0742 pesticides and associated Post Limited 8,000.00 0.00 Canceled 2018-07-02 2018-08-08 2018-12-12 professionnelles et individuel Quotations Envelope wastes accident CI-PROCEP-CI-66563-NC- RFQ / Organisation d'une Promotion of alternatives to Request for Single Stage - One campagne sur les journées TF / A0742 Post Limited 30,000.00 0.00 Canceled 2018-08-05 2018-09-12 2018-10-31 chemical pesticides Quotations Envelope scientifiques, achat d'espaces et couverture médiatique CI-PROCEP-CI-108362-NC- DIR / Convention avec l'Association Ivoirienne des Promotion of alternatives to Sciences Agronomiques (AISA) TF / A0742 Prior Direct Selection Direct 173,240.00 0.00 Canceled 2019-04-08 2019-04-10 2019-04-25 2021-04-14 chemical pesticides pour la mise en place et la gestion de champs pilotes de démonstration CI-PROCEP-CI-108527-NC- RFQ / Production de supports Management of obsolete Request for Single Stage - One de sensibilisation et de TF / A0742 pesticides and associated Post Open - National 15,000.00 0.00 Canceled 2019-05-13 2019-06-05 2019-07-20 Quotations Envelope supports de communication et wastes gadgets CI-PROCEP-CI-108530-NC- Management of obsolete Request for Single Stage - One RFQ / Réalisation et diffusion TF / A0742 pesticides and associated Post Open - National 26,000.00 0.00 Canceled 2019-05-26 2019-07-21 2019-07-25 Quotations Envelope d'un film sur les pesticides wastes Management of obsolete CI-PROCEP-CI-108532-NC- Request for Single Stage - One TF / A0742 pesticides and associated Post Open - National 40,000.00 0.00 Canceled 2019-05-05 2019-06-02 2019-06-06 RFQ / Dialogue production Quotations Envelope wastes Page 2 CI-PROCEP-CI-108538-NC- RFQ / Entretien et réparation Regulatory and institutional Request for Single Stage - One des installations électriques TF / A0742 Post Open - National 14,000.00 0.00 Canceled 2019-04-27 2019-05-20 2019-05-23 framework Quotations Envelope (climatiseurs, électricité) et sanitaires CI-PROCEP-CI-108542-NC- RFQ / Entretien et Regulatory and institutional Request for Single Stage - One TF / A0742 Post Open - National 10,000.00 0.00 Canceled 2019-04-28 2019-05-14 2019-05-17 maintenance du matériel framework Quotations Envelope informatique CI-PROCEP-CI-108544-NC- DIR / Assurance du personnel Regulatory and institutional TF / A0742 Post Direct Selection Direct 20,000.00 0.00 Canceled 2019-04-03 2019-04-08 2019-04-25 2020-04-24 (maladie et individuelle framework accident) CI-PROCEP-CI-108546-NC- Regulatory and institutional TF / A0742 Post Direct Selection Direct 15,000.00 0.00 Canceled 2019-04-03 2019-04-08 2019-04-10 2020-04-09 DIR / Assurance des véhicules framework CI-PROCEP-CI-108552-NC- Regulatory and institutional Request for Single Stage - One RFQ / Assurance multirisques TF / A0742 Post Open - National 2,000.00 0.00 Canceled 2019-04-14 2019-05-06 2019-05-08 framework Quotations Envelope professionnelles CI-PROCEP-CI-108554-NC- DIR / Entretien et Regulatory and institutional TF / A0742 Post Direct Selection Direct 8,400.00 0.00 Canceled 2019-04-08 2019-04-09 2019-04-20 2019-05-26 maintenance du logiciel de framework financière (TOMPRO et TOMPAIE) CI-PROCEP-CI-108558-NC- Regulatory and institutional Request for Single Stage - One RFQ / Entretien et réparation TF / A0742 Post Open - National 20,000.00 0.00 Canceled 2019-04-15 2019-05-12 2019-05-15 framework Quotations Envelope des véhicules CI-PROCEP-CI-108559-NC- RFQ / Installation d'un Regulatory and institutional Request for Single Stage - One TF / A0742 Post Open - National 24,000.00 0.00 Canceled 2019-04-21 2019-05-14 2019-06-19 système d'archivage framework Quotations Envelope électronique et physique CI-PROCEP-CI-108536-NC- RFQ / Contrat avec RMG COTE Pending D'IVOIRE SA pour la collecte, Single Stage - One TF / A0742 Project management Post Request for Bids Open - National 899,750.00 0.00 Implementati 2019-05-14 2019-05-19 2019-05-22 2019-05-23 2019-06-20 2019-12-17 le transport et l'élimination Envelope on des pesticides obsolètes et déchets associés CI-PROCEP-CI-148882-NC- DIR / Contrat avec la société RMG COTE D'IVOIRE pour la Management of obsolete Pending sauvegarde, la pré-collecte, la TF / A0742 pesticides and associated Post Direct Selection Direct 899,750.00 0.00 Implementati 2020-02-20 2020-02-25 2020-03-21 2020-05-20 collecte, le transport et wastes on l'élimination des pesticides obsolètes et déchets associés (PODA) CI-PROCEP-CI-65791-NC- RFQ / Contrat avec l'assureur Pending WILILS TOWERS pour TF / A0742 Project management Post Direct Selection Direct 4,000.00 0.00 Implementati 2019-12-12 2019-12-15 2020-01-01 2020-12-26 Couverture assurance maladie on du personnel CI-PROCEP-CI-148883-NC- DIR / Contrat avec le Centre Médical CHENAL pour la Management of obsolete Pending réalisation des tests de TF / A0742 pesticides and associated Post Direct Selection Direct 12,600.00 0.00 Implementati 2019-12-13 2019-12-16 2019-12-28 2020-02-26 cholinestérase post-inventaire wastes on sur les agents ayant réalisé l'inventaire des pesticides CI-PROCEP-CI-211446-GO- RFQ / EDITION DE DOCUMENTS CLES ( GUIDE Management of obsolete Pending JURIDIQUE, GUIDE Request for Single Stage - One TF / A0742 pesticides and associated Post Open - National 13,000.00 0.00 Implementati 2021-01-03 2021-02-28 2021-08-27 INVENTAIRE, INDEX Quotations Envelope wastes on PHYTOSANITAIRE) POUR LA GESTION DURABLE DES PESTICIDES CI-PROCEP-CI-211447-CS- CDS / PRODUCTION ET Pending DIFFUSION D'UN TELEFILM SUR Promotion of alternatives to TF / 15059 Post Direct Selection Direct 80,000.00 0.00 Implementati 2020-12-30 2021-01-04 2021-02-08 2021-08-07 LES PESTICIDES EN COTE chemical pesticides on D'IVOIRE ( CONTRAT AVEC CIPROFILM) CI-PROCEP-CI-211451-NC- RFQ / RECRUTEMENT D'UNE AGENCE DE COMMUNICATION Pending POUR LA COUVERTURE Request for Single Stage - One TF / A0742 Project management Post Open - National 29,000.00 0.00 Implementati 2021-01-05 2021-03-02 2021-08-29 MEDIATIQUE DES EVENEMENTS Quotations Envelope on MAJEURS ET LA DISSEMINATION DES ACQUIS DU PROJET. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PROCEP-CI-65876-CS- CQS / Evaluation Consultant Regulatory and institutional environnementale et sociale TF / A0742 Post Qualification Open - National 50,000.00 0.00 Canceled 2018-06-26 2018-07-02 2018-07-23 2018-07-31 2018-08-31 2018-09-30 framework de deux (02) sites de Selection stockages CI-PROCEP-CI-65973-CS- CQS / Analyse de pesticides et Consultant Promotion of alternatives to de résidus de pesticides dans TF / A0742 Post Qualification Open - National 60,000.00 0.00 Canceled 2018-08-15 2018-08-21 2018-09-07 2018-09-13 2018-10-03 2018-12-03 chemical pesticides les différents milieux Selection environnementaux Page 3 CI-PROCEP-CI-65880-CS- QCBS / Etude technique et Management of obsolete Quality And Cost- Suivi des travaux de TF / A0742 pesticides and associated Post Open - National 44,000.00 0.00 Canceled 2019-05-08 2019-05-16 2019-06-01 2019-06-01 2019-06-01 2019-06-01 2019-06-21 2019-08-20 Based Selection construction des sites de wastes stockage CI-PROCEP-CI-108364-CS- CQS / Recrutement d'un Consultant laboratoire pour des Promotion of alternatives to TF / A0742 Post Qualification Open - National 160,000.00 0.00 Canceled 2019-04-03 2019-04-18 2019-04-23 2019-04-30 2019-05-12 2019-07-11 recherches de résidus dans chemical pesticides Selection les différentes spéculations traitées CI-PROCEP-CI-108365-CS- CQS / Etude d'impact Consultant Promotion of alternatives to environnemental et social et TF / A0742 Post Qualification Open - National 60,000.00 0.00 Canceled 2019-05-21 2019-06-11 2019-07-02 2019-07-09 2019-07-24 2019-09-22 chemical pesticides l'audit environnemental des Selection sites de stockage provisoire CI-PROCEP-CI-65887-CS- QCBS / Audit comptable et Quality And Cost- Pending TF / A0742 Project management Post Open - National 20,000.00 0.00 2020-02-24 2020-03-04 2020-04-02 2020-05-03 2020-05-05 2020-05-10 2020-06-11 2020-11-09 financier des exercices 2019 Based Selection Implementation et 2020 du PROGEP-CI CI-PROCEP-CI-161237-CS- CQS / Recrutement d'un Consultant Regulatory and institutional cabinet pour l'élaboration de TF / A0742 Post Qualification Open - National 60,000.00 0.00 Under Review 2020-02-28 2020-03-04 2020-03-14 2020-03-28 2020-04-04 2020-04-10 2020-06-09 framework la stratégie de communication Selection du PROGEP-CI CI-PROCEP-CI-176324-CS- CQS / Recrutement d'un Management of obsolete Consultant Pending Consultant individuel pour TF / A0742 pesticides and associated Post Qualification Open - National 30,000.00 0.00 2020-12-08 2020-12-15 2020-12-25 2020-12-30 2021-01-10 2021-02-09 Implementation l'évaluation finale du PROGEP- wastes Selection CI CI-PROCEP-CI-176329-CS- Consultant CQS / Recrutement d'un Promotion of alternatives to Pending TF / A0742 Post Qualification Open - National 60,000.00 0.00 2020-11-30 2020-12-14 2020-12-29 2021-01-01 2021-01-13 2021-02-03 cabinet pour la formation des chemical pesticides Implementation Selection techniciens de laboratoires CI-PROCEP-CI-65818-CS- QCBS / Elaboration de la Regulatory and institutional Quality And Cost- Pending TF / A0742 Post Open - National 60,000.00 0.00 2018-06-21 2018-06-28 2018-07-17 2018-08-20 2018-08-24 2018-08-28 2018-09-10 2018-11-09 stratégie de communication framework Based Selection Implementation du PROGEP-CI INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PROCEP-CI-60105-CS- CDS / Contrat avec le cabinet BEERA pour la conception des fiches d'inventaire Management of obsolete Pending numériques des pesticides TF / A0742 pesticides and associated Post Direct Selection Direct 146,778.00 0.00 2017-07-03 2017-07-07 2017-07-24 2018-01-20 Implementation obsolète, la création d'une wastes base de données des pesticides et l'encadrement des agents d'inventaires t CI-PROCEP-CI-65845-CS- Management of obsolete CDS / Contrat avec le cabinet Under TF / A0742 pesticides and associated Post Direct Selection Direct 100,000.00 0.00 2018-06-21 2018-07-04 2018-07-20 2018-12-31 BEERA pour la mise en place Implementation wastes de l'interface « VALIDATOR » CI-PROCEP-CI-65837-CS- Individual Regulatory and institutional INDV / Formation des TF / A0742 Post Consultant Limited 10,000.00 0.00 Canceled 2018-08-02 2018-08-17 2018-08-30 2018-09-10 2018-09-30 framework techniciens de laboratoires Selection CI-PROCEP-CI-65809-CS- Individual INDV / Elaboration d'avant Regulatory and institutional Pending TF / A0742 Post Consultant Limited 14,000.00 0.00 2018-06-18 2018-06-23 2018-07-02 2018-07-16 2018-08-20 projets de lois sur la gestion framework Implementation Selection des pesticides CI-PROCEP-CI-65856-CS- Management of obsolete Individual INDV / Elaboration de la TF / A0742 pesticides and associated Post Consultant Limited 10,500.00 0.00 Canceled 2018-08-09 2018-08-11 2018-08-25 2018-09-06 2018-10-10 stratégie nationale de wastes Selection pesticides et déchets associés CI-PROCEP-CI-66041-CS- CDS / Mise en place et la gestion des champs pilotes de Promotion of alternatives to démonstration dans les zones TF / A0742 Post Direct Selection Direct 60,000.00 0.00 Canceled 2018-06-20 2018-07-02 2018-07-23 2018-12-31 chemical pesticides cotonnière, cacaoyère et vivrière : Contrat avec CEA- CCBAD CI-PROCEP-CI-66047-CS- CDS / Mise en place et gestion des champs pilotes de démonstration dans les zones Promotion of alternatives to TF / A0742 Post Direct Selection Direct 40,000.00 0.00 Canceled 2018-06-20 2018-06-30 2018-08-06 2018-12-31 cotonnière, cacaoyère et chemical pesticides vivrière : Contrat avec l'Association Ivoirienne des Sciences Agronomiques (AISA) CI-PROCEP-CI-60119-CS- CDS / Contrat avec l'Expert Management of obsolete AMMATI pour la formation sur Pending TF / A0742 pesticides and associated Post Direct Selection Direct 65,220.00 0.00 2017-03-16 2017-03-18 2017-04-12 2018-12-31 les techniques d'inventaire Implementation wastes l'encadrement des agents d'inventaire CI-PROCEP-CI-60115-CS- CDS / Contrat avec BAMASOFT NETWORK pour la conception (adaptation) et l'installation de Regulatory and institutional TF / A0742 Post Direct Selection Direct 60,110.00 0.00 Canceled 2017-06-01 2017-06-04 2017-07-22 2018-11-28 l'application en ligne « RUCHE framework » pour le suivi-évaluation de l'UIAP Procurement of individual heating substations Page 4 CI-PROCEP-CI-108355-CS- INDV / Recrutement d'un consultant individuel pour la Individual réalisation de l'état des lieux Regulatory and institutional TF / A0742 Post Consultant Open 60,000.00 0.00 Canceled 2019-04-30 2019-05-30 2019-06-06 2019-06-21 2019-08-20 (personnel et équipement) des framework Selection laboratoires d'analyses des pesticides et la formation du personnel CI-PROCEP-CI-108361-CS- CDS / Contrat avec le cabinet BEERA TECHNOLOGY pour le Management of obsolete Pending développement du module de TF / A0742 pesticides and associated Post Direct Selection Direct 234,000.00 0.00 2019-04-01 2019-04-05 2019-04-14 2019-06-13 Implementation traitement des données du wastes Système d'Information des pesticides CI-PROCEP-CI-108363-CS- CDS / Convention le CEA- Promotion of alternatives to Pending TF / A0742 Post Direct Selection Direct 199,060.00 0.00 2019-05-07 2019-05-13 2019-05-27 2021-05-16 CCBAD pour la réalisation des chemical pesticides Implementation tests de biopesticides CI-PROCEP-CI-108366-CS- Individual INDV / Recrutement d'un TF / A0742 Project management Post Consultant Open 21,000.00 0.00 Canceled 2019-04-08 2019-05-02 2019-05-04 2019-05-27 2021-08-14 Assistant comptable Selection CI-PROCEP-CI-108367-CS- Individual INDV / Recrutement d'un TF / A0742 Project management Post Consultant Open 7,200.00 0.00 Canceled 2019-04-08 2019-05-02 2019-05-04 2019-05-16 2021-08-03 chauffeur Selection CI-PROCEP-CI-159877-CS- INDV / Recrutement d'un consultant pour une session Individual de formation de 5 jours au Regulatory and institutional TF / A0742 Post Consultant Open 70,000.00 0.00 Canceled 2020-03-20 2020-04-21 2020-04-28 2020-05-15 2020-07-14 profit de 15 techniciens des framework Selection laboratoires publics d'analyses et de prélèvement sélectionnés CI-PROCEP-CI-175732-CS- INDV / Recrutement d'un consultant individuel pour Management of obsolete Individual Pending l'évaluation de la mise en TF / A0742 pesticides and associated Post Consultant Open 10,000.00 0.00 2020-11-30 2021-01-03 2021-01-08 2021-01-20 2021-02-19 Implementation oeuvre du Cadre de Gestion wastes Selection Environnementale et Sociale du PROGEP-CI CI-PROCEP-CI-211456-CS- INDV / RECRUTEMENT D'UN Management of obsolete Individual CONSULTANT INDIVIDUEL Under TF / A0742 pesticides and associated Post Consultant Open 20,000.00 0.00 2021-01-07 2021-02-25 2021-03-18 2021-04-22 2021-10-19 POUR L'ELABORATION DU Implementation wastes Selection GUIDE NATIONAL DES BIOPESTICIDES CI-PROCEP-CI-211457-CS- INDV / ELABORATION DES SOUS- SYSTEME Management of obsolete Pending D'UTILISATION, TF / A0742 pesticides and associated Post Direct Selection Direct 56,000.00 0.00 2021-01-06 2021-01-16 2021-03-22 2021-09-18 Implementation DE'HOMOLOGATION ET LES wastes LIENS AVEC LES SITES EXISTANTS CI-PROCEP-CI-211459-CS- INDV / RECRUTEMENT D'UN CONSULTANT INDIVIDUEL Management of obsolete Individual Pending POUR LA CONNEXION AUX TF / A0742 pesticides and associated Post Consultant Open 17,400.00 0.00 2021-01-12 2021-03-02 2021-03-23 2021-04-27 2021-10-24 Implementation INTERFACES DES SYSTEMES wastes Selection D'INFORMATION SUR LES PESTICIDES CI-PROCEP-CI-211467-CS- CDS / CONTRAT AVEC BEERA Management of obsolete POUR L'ABONNEMENT ET LA Pending TF / A0742 pesticides and associated Post Direct Selection Direct 30,000.00 0.00 2021-01-14 2021-01-24 2021-03-30 2021-09-26 MAINTENANCE DU SYSTEME Implementation wastes D'INFORMATION SUR LES PESTICIDES CI-PROCEP-CI-211454-CS- INDV / RECRUTEMENT D'UN Management of obsolete Individual CONSULTANT POUR TF / A0742 pesticides and associated Post Consultant Open 20,000.00 0.00 Canceled 2021-01-06 2021-02-24 2021-03-17 2021-04-21 2021-10-18 L'ELABORATION DU RAPPORT wastes Selection FINAL DU CGES CI-PROCEP-CI-234334-CS- CDS / CONTRAT AVECLE CONSULTANT AMMATI POUR L'ÉVALUATION FINALE DU Management of obsolete PROGEP-CI ET DE LA MISE EN TF / A0742 pesticides and associated Post Direct Selection Direct 50,000.00 0.00 Under Review 2021-05-27 2021-05-31 2021-05-30 2021-06-02 2021-06-27 ŒUVRE DU CADRE DE wastes GESTION DE LA GESTION ENVIRONNMETALE ET SOCIALE (CGES) Page 5 PROCUREMENT PLAN (Textual Part) Project information: [Nigeria] [Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project] [P-166239] Project Implementation Agency: [Federal Ministry of Education] Date of the Procurement Plan: [2109/10/24] Period covered by this Procurement Plan: [October 24, 2019 – April 23, 2020] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017, August 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. - “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables - “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable. Goods: Not Applicable Works: Not Applicable Consultancy: Not Applicable Hands-on Expanded Implementation Support (HEIS): Not Applicable PROCUREMENT Nigeria : Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2020-01-08 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166239 GPN Date: Project Name: Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS) Project Loan / Credit No: IDA / V2700, IDA / 65140 Federal Ministry of Education - IDEAS Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NPCU/IDEAS/CW/01/21 / Increasing the availability of Request for Pending Renovation and Upgrading of competent and motivated Request for Single Stage - One 2022-01- IDA / 65140 Post Limited Quotations (Non 200,000.00 0.00 Implementat 2021-05-14 2021-07-09 National Project Secretariat technical teachers and Quotations Envelope 05 Bank-SPD) ion Offices in Abuja instructors GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NPS/IDEAS/G/NS/2/19 / Increasing the availability of Under Procurement of Office competent and motivated Request for Single Stage - One IDA / V2700 Post Limited 90,000.00 0.00 Implementati 2019-11-01 2019-09-26 2019-12-27 2020-06-24 Equipment (2 Lots for FME technical teachers and Quotations Envelope on and NBTE) instructors Increasing the availability of NPS/IDEAS/G/NS/1/19 / Pending competent and motivated Request for Single Stage - One Procurement and delivery of IDA / V2700 Post Limited 150,000.00 0.00 Implementati 2021-05-08 2021-07-03 2021-12-30 technical teachers and Quotations Envelope Project Vehicles on instructors NPCU/IDEAS/GO/02/21 / Increasing the availability of Establishment of Management Pending competent and motivated Single Stage - One Information System (MIS) for IDA / 65140 Post Request for Bids Open - National 300,000.00 0.00 Implementati 2021-09-20 2021-09-25 2021-11-06 2021-12-06 2022-01-10 2022-07-09 technical teachers and Envelope National Project Secretariat, on instructors Abuja NPCU/IDEAS/GO/01/21 / Increasing the availability of Procurement of Digital ICT Pending competent and motivated Single Stage - One Materials and Equipment for IDA / 65140 Post Request for Bids Open - National 600,000.00 0.00 Implementati 2021-09-13 2021-09-18 2021-10-30 2021-11-29 2022-01-03 2022-07-02 technical teachers and Envelope TVET Teachers - North & on instructors South Increasing the availability of NPCU/IDEAS/GO/03/21 / Pending competent and motivated Request for Single Stage - One Procurement of Office IDA / 65140 Post Limited 100,000.00 0.00 Implementati 2021-06-19 2021-08-14 2022-02-10 technical teachers and Quotations Envelope Furniture for NPCU/FME on instructors Strengthening the regulatory NPCU/IDEAS/GO/07/21 / environment and public Pending Computerization of Request for IDA / 65140 management capacities for Post 30,000.00 0.00 Implementati 2021-05-21 2021-07-16 2022-01-12 Accounting Unit/Accounting Quotations market-oriented skills on Software development Increasing the availability of NPCU/IDEAS/GO/04/21 / Pending competent and motivated Single Stage - One Procurement of Office & ICT IDA / 65140 Post Request for Bids Open - National 300,000.00 0.00 Implementati 2021-05-10 2021-05-15 2021-06-26 2021-07-26 2021-08-30 2022-02-26 technical teachers and Envelope Equipment for NPCU/FME on instructors NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NPCU/IDEAS/GO/06/21 / Strengthening the regulatory Production of Project environment and public Pending Request for Single Stage - One Documents: PAD, PIM, Store IDA / 65140 management capacities for Post Limited 50,000.00 0.00 Implementati 2021-07-10 2021-09-04 2022-03-03 Quotations Envelope Documents, Procurement and market-oriented skills on Financial Documents etc. development CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NPS/IDEAS/C/CS/1/19 / Assessment and Planning Consultant Improving skills formation in Under Studies of Supported Federal IDA / V2700 Post Qualification Limited 300,000.00 0.00 2019-10-29 2020-02-26 2019-11-12 2020-02-21 2019-12-12 2020-04-14 2020-01-16 2020-07-14 the informal sector Implementation Technical Colleges and States Selection Colleges - Northern Zone NG-IDEAS PROJECT-142220- CS-CQS / Assessment and Increasing the availability of Consultant planning studies of supported competent and motivated Under IDA / V2700 Post Qualification Limited 300,000.00 0.00 2019-10-31 2020-02-26 2019-11-14 2020-02-21 2019-12-14 2020-04-14 2020-01-18 2020-07-16 federal technical colleges and technical teachers and Implementation Selection states colleges - Southern instructors Zone NG-IDEAS PROJECT-142222- Increasing the availability of Consultant CS-CQS / Reviewing of competent and motivated Under IDA / V2700 Post Qualification Limited 150,000.00 0.00 2019-10-30 2020-07-07 2019-11-13 2020-09-04 2019-12-13 2020-11-06 2020-01-17 2020-07-15 National Occupational technical teachers and Implementation Selection Standard (NSO) in Nigeria instructors Increasing the availability of NG-IDEAS PROJECT-142226- Consultant competent and motivated Under CS-CQS / Survey on Skills IDA / V2700 Post Qualification Limited 250,000.00 0.00 2019-10-24 2020-02-21 2019-11-07 2020-03-06 2019-12-07 2020-05-27 2020-01-11 2020-07-09 technical teachers and Implementation Development Eco-system Selection instructors Page 1 NPS/IDEAS/C/CS/2/19 / Increasing the availability of Consultant Baseline Study of Technical competent and motivated IDA / V2700 Post Qualification Limited 150,000.00 0.00 Under Review 2019-11-03 2020-02-06 2019-11-17 2019-12-17 2020-01-21 2020-07-19 Teachers and Instructors in technical teachers and Selection Nigeria instructors Incentivizing partnerships NPCU/IDEAS/CS/01/21 / with industry for enhanced Consultant Pending Tracers Studies on Technical IDA / 65140 quality and labour-market Post Qualification Limited 200,000.00 0.00 2021-06-28 2021-07-12 2021-08-11 2021-09-15 2022-03-14 Implementation Colleges Graduands orientation of public Selection Technical Colleges Strengthening the regulatory NPCU/IDEAS/CS/28/21 / environment and public Consultant Project Climate Change Pending IDA / 65140 management capacities for Post Qualification Limited 80,000.00 0.00 2021-08-18 2021-09-01 2021-10-01 2021-11-05 2022-05-04 Mitigation and Adaptation Implementation market-oriented skills Selection Plan development Strengthening the regulatory NPCU/IDEAS/CS/29/21 / environment and public Consultant Pending Study on Barriers and IDA / 65140 management capacities for Post Qualification Limited 150,000.00 0.00 2021-05-21 2021-06-04 2021-07-04 2021-08-08 2022-02-04 Implementation Opportunities of PwD market-oriented skills Selection development NPCU/IDEAS/CS/08/21 / Increasing the availability of Consultant Develop Strategies to Improve competent and motivated Pending IDA / 65140 Post Qualification Limited 150,000.00 0.00 2021-10-25 2021-11-08 2021-12-08 2022-01-12 2022-07-11 the Pre-Service Training of technical teachers and Implementation Selection TVET Teachers and Instructors instructors NPCU/IDEAS/CS/09/21 / Increasing the availability of Develop Structures for Consultant competent and motivated Pending Continuous Professional IDA / 65140 Post Qualification Limited 150,000.00 0.00 2021-07-05 2021-07-19 2021-08-18 2021-09-22 2022-03-21 technical teachers and Implementation Development CPD of TVET Selection instructors Teachers & Instructors Increasing the availability of NPCU/IDEAS/CS/10/21 / Consultant competent and motivated Pending Develop Pilot Measurement IDA / 65140 Post Qualification Limited 200,000.00 0.00 2021-10-11 2021-10-25 2021-11-24 2021-12-29 2022-06-27 technical teachers and Implementation Instrument Selection instructors NPCU/IDEAS/CS/02/21 / Incentivizing partnerships Assessment of the Scope of with industry for enhanced Consultant Pending the Challenges of Students & IDA / 65140 quality and labour-market Post Qualification Limited 160,000.00 0.00 2021-07-22 2021-08-05 2021-09-04 2021-10-09 2022-04-07 Implementation Teachers with Special Needs orientation of public Selection and the Needed Intervention Technical Colleges NPCU/IDEAS/CS/03/21 / Incentivizing partnerships Support for Institutional with industry for enhanced Consultant Pending Development Plan (IDP) for IDA / 65140 quality and labour-market Post Qualification Limited 200,000.00 0.00 2021-05-03 2021-05-17 2021-06-16 2021-07-21 2022-01-17 Implementation Federal Technical Colleges orientation of public Selection (FTCs) Technical Colleges NPCU/IDEAS/CS/07/21 / Increasing the availability of Consultant Develop Capacity competent and motivated Pending IDA / 65140 Post Qualification Limited 150,000.00 0.00 2021-09-22 2021-10-06 2021-11-05 2021-12-10 2022-06-08 Enhancement Plan for TC technical teachers and Implementation Selection Teaching Staff instructors NPCU/IDEAS/CS/05/21 / Increasing the availability of Consultant Drafting of Human Resource competent and motivated Pending IDA / 65140 Post Qualification Limited 100,000.00 0.00 2021-07-05 2021-07-19 2021-08-18 2021-09-22 2022-03-21 Strategy for Skill Development technical teachers and Implementation Selection Document instructors NPCU/IDEAS/CS/13/21 / Increasing the availability of Consultant Feasibility Study for the use of competent and motivated Pending IDA / 65140 Post Qualification Limited 200,000.00 0.00 2021-08-02 2021-08-16 2021-09-15 2021-10-20 2022-04-18 Technology in Skills technical teachers and Implementation Selection Development in Nigeria instructors Strengthening the regulatory NPCU/IDEAS/CS/17/21 / environment and public Consultant Engagement of Consultant to Pending IDA / 65140 management capacities for Post Qualification Limited 150,000.00 0.00 2021-05-30 2021-06-13 2021-07-13 2021-08-17 2022-02-13 Develop Communication Implementation market-oriented skills Selection Strategy development Increasing the availability of NPCU/IDEAS/CS/14/21 / Consultant competent and motivated Pending Study on Financing Skills IDA / 65140 Post Qualification Limited 200,000.00 0.00 2021-07-25 2021-08-08 2021-09-07 2021-10-12 2022-04-10 technical teachers and Implementation Development in Nigeria Selection instructors Strengthening the regulatory NPCU/IDEAS/CS/19/21 / environment and public Consultant Pending Engagement of External IDA / 65140 management capacities for Post Qualification Limited 30,000.00 0.00 2021-06-15 2021-06-29 2021-07-29 2021-09-02 2022-03-01 Implementation Auditor market-oriented skills Selection development NPCU/IDEAS/CS/06/21 / Conduct Teachers/Instructors Increasing the availability of Consultant Needs Assessment of TCs competent and motivated Pending IDA / 65140 Post Qualification Limited 300,000.00 0.00 2021-10-18 2021-11-01 2021-12-01 2022-01-05 2022-07-04 (Including Digital Literacy technical teachers and Implementation Selection Skill) For selected TCs in the instructors Country Strengthening the regulatory NPCU/IDEAS/CS/23/21 / environment and public Consultant Engagement of Project Pending IDA / 65140 management capacities for Post Qualification Limited 60,000.00 0.00 2021-05-31 2021-06-14 2021-07-14 2021-08-18 2022-02-14 Technical Assistants (TA) - Implementation market-oriented skills Selection ICT development Strengthening the regulatory NPCU/IDEAS/CS/27/21 / environment and public Consultant Engagement of Project Pending IDA / 65140 management capacities for Post Qualification Limited 60,000.00 0.00 2021-06-21 2021-07-05 2021-08-04 2021-09-08 2022-03-07 Technical Assistants (TA) - Implementation market-oriented skills Selection Technical on TVET development INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 NPCU/IDEAS/CS/04/21 / Increasing the availability of Individual Technical Assistance for competent and motivated Pending IDA / 65140 Post Consultant Limited 100,000.00 0.00 2021-06-28 2021-07-03 2021-07-24 2021-08-28 2022-02-24 Human Resource Strategy for technical teachers and Implementation Selection Skill Development instructors Increasing the availability of NPCU/IDEAS/CS/12/21 / Individual competent and motivated Pending Develop a Concept for the IDA / 65140 Post Consultant Limited 100,000.00 0.00 2021-07-06 2021-07-11 2021-08-01 2021-09-05 2022-03-04 technical teachers and Implementation TVET MIS in Nigeria Selection instructors Strengthening the regulatory NPCU/IDEAS/CS/18/21 / environment and public Individual Pending Development and Hosting of IDA / 65140 management capacities for Post Consultant Limited 100,000.00 0.00 2021-04-26 2021-05-01 2021-05-22 2021-06-26 2021-12-23 Implementation TVET Portal Platform market-oriented skills Selection development Strengthening the regulatory NPCU/IDEAS/CS/22/21 / environment and public Individual Engagement of Project Pending IDA / 65140 management capacities for Post Consultant Limited 100,000.00 0.00 2021-05-31 2021-06-05 2021-06-26 2021-07-31 2022-01-27 Technical Assistants (TA) - M Implementation market-oriented skills Selection &E development Strengthening the regulatory NPCU/IDEAS/CS/21/21 / environment and public Individual Engagement of Project Pending IDA / 65140 management capacities for Post Consultant Limited 100,000.00 0.00 2021-05-02 2021-05-07 2021-05-28 2021-07-02 2021-12-29 Technical Assistants (TA) - Implementation market-oriented skills Selection Financial Management development Strengthening the regulatory NPCU/IDEAS/CS/30/21 / environment and public Individual Engagement of Consultant to Pending IDA / 65140 management capacities for Post Consultant Limited 100,000.00 0.00 2021-05-07 2021-05-12 2021-06-02 2021-07-07 2022-01-03 Conduct Gender Based Implementation market-oriented skills Selection Violence (GBV) Mapping development Strengthening the regulatory NPCU/IDEAS/CS/24/21 / environment and public Individual Engagement of Project Pending IDA / 65140 management capacities for Post Consultant Limited 100,000.00 0.00 2021-05-03 2021-05-08 2021-05-29 2021-07-03 2021-12-30 Technical Assistants (TA) - Implementation market-oriented skills Selection Safeguard development Strengthening the regulatory NPCU/IDEAS/CS/16/21 / environment and public Individual Website Development, Pending IDA / 65140 management capacities for Post Consultant Limited 20,000.00 0.00 2021-04-26 2021-05-01 2021-05-22 2021-06-26 2021-12-23 Hosting Fee and Maintenance Implementation market-oriented skills Selection Fee development Strengthening the regulatory NPCU/IDEAS/CS/20/21 / environment and public Individual Engagement of Project Pending IDA / 65140 management capacities for Post Consultant Limited 55,000.00 0.00 2021-05-02 2021-05-07 2021-05-28 2021-07-02 2021-12-29 Technical Assistants (TA) - Implementation market-oriented skills Selection Procurement development Increasing the availability of NPCU/IDEAS/CS/15/21 / Individual competent and motivated Pending Engagement of TA on IDA / 65140 Post Consultant Limited 55,000.00 0.00 2021-05-31 2021-06-05 2021-06-26 2021-07-31 2022-01-27 technical teachers and Implementation Innovation Grant Manager Selection instructors Strengthening the regulatory NPCU/IDEAS/CS/26/21 / environment and public Individual Engagement of Project Pending IDA / 65140 management capacities for Post Consultant Limited 50,000.00 0.00 2021-05-18 2021-05-23 2021-06-13 2021-07-18 2022-01-14 Technical Assistants (TA) - Implementation market-oriented skills Selection Technical to NPC development Strengthening the regulatory NPCU/IDEAS/CS/25/21 / environment and public Individual Pending Engagement of Project IDA / 65140 management capacities for Post Consultant Limited 100,000.00 0.00 2021-05-31 2021-06-05 2021-06-26 2021-07-31 2022-01-27 Implementation Technical Assistants (TA) - HR market-oriented skills Selection development Page 3 18 months procurement plan based on both LRTF and Counterpart funds I. General 1. Project information: Liberia Cheesemanburg Landfill & Urban Sanitation Program P159961 2. Bank’s approval Date of the procurement Plan : 3. Date of General Procurement Notice: August 16, 2017 4. Period covered by this procurement plan: June 2017 to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. In accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. Not expected for the packages of works/goods packages in the procurement plan. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable July 9, 2010 4. Reference to (if any) Project Operational/Procurement Manual: The CLUS Project July 2017 Procurement Implementation Manual which forms part of Project Implementation Manual (PIM). 5. Any Other Special Procurement Arrangements: Not applicable III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comment Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not applicable July 9, 2010 PROCUREMENT Liberia : Cheesemanburg Landfill and Urban Sanitation Project PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2017-09-28 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159961 GPN Date: 2017-12-19 Project Name: Cheesemanburg Landfill and Urban Sanitation Project Loan / Credit No: / , TF / A5269 M Executing Agency(ies): onrovia City Corporation WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-MCC-26882-CW-RFQ / Waste Collection and Request for Single Stage - One 2018-06- Maintenance of Access Road / Post Open - National 67,594.00 77,015.68 Terminated 2017-10-14 2017-12-09 Disposal Quotations Envelope 07 for Landfill Construction of the MCC-PIU-REF-3 / Drilling of Cheesemanburg Regional Single Stage - One 2018-12- TF / A5269 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2018-02-19 2018-02-24 2018-04-07 2018-05-07 2018-06-11 Boreholes at Cheesemanburg Landfill and Partial Closure of Envelope 08 the Whein Town Landfill Construction of the MCC-PIU-REF-1 / Cheesemanburg Regional Single Stage - One 2019-11- Construction of TF / A5269 Prior Request for Bids Open - International 4,000,000.00 0.00 Canceled 2019-01-14 2019-01-19 2019-03-02 2019-04-01 2019-05-06 Landfill and Partial Closure of Envelope 02 Cheesemanburg Landfill the Whein Town Landfill Construction of the MCC-PIU-REF5 / Whein Town Cheesemanburg Regional Single Stage - One 2019-09- TF / A5269 Post Request for Bids Open - National 250,000.00 0.00 Canceled 2018-12-05 2018-12-10 2019-01-21 2019-02-20 2019-03-27 Permanent Closure Landfill and Partial Closure of Envelope 23 the Whein Town Landfill MCC-PIU-REF-2 / Construction of the Construction of Road Cheesemanburg Regional Single Stage - One 2019-05- TF / A5269 Post Request for Bids Open - National 200,000.00 0.00 Canceled 2018-08-01 2018-08-06 2018-09-17 2018-10-17 2018-11-21 Extension to the Landfill and Partial Closure of Envelope 20 Cheesemanburg Community the Whein Town Landfill Construction of the MCC-PIU-REF-6 / Cheesemanburg Regional Single Stage - One 2019-04- Rehabilitation Works at the TF / A5269 Post Request for Bids Open - National 225,000.00 0.00 Canceled 2018-07-02 2018-07-07 2018-08-18 2018-09-17 2018-10-22 Landfill and Partial Closure of Envelope 20 existing Transfer Stations the Whein Town Landfill Construction of the LR-MCC-87126-CW-FCA / Cheesemanburg Regional 2019-07- Rehabilitation works at TF / A5269 Post Force Account Direct 23,500.00 11,579.00 Signed 2018-11-28 2018-12-12 2018-12-03 2018-12-19 2019-01-07 2018-12-20 Landfill and Partial Closure of 06 existing Transfer Stations the Whein Town Landfill LR-MCC-54480-CW-RFB / Construction of the Construction of Road Cheesemanburg Regional Single Stage - One 2020-02- TF / A5269 Post Request for Bids Open - National 200,000.00 0.00 Canceled 2019-04-30 2019-01-18 2019-05-05 2019-06-16 2019-02-27 2019-07-16 2019-08-20 Extension to Cheesemenburg Landfill and Partial Closure of Envelope 16 Community the Whein Town Landfill LR-MCC-87128-CW-FCA / Construction of Conerstone and Demarcation line with Construction of the Sandcree Block and Mass Cheesemanburg Regional 2019-07- Concrete arround the 100 TF / A5269 Post Force Account Direct 8,500.00 0.00 Canceled 2018-11-29 2018-12-12 2018-12-04 2018-12-19 2019-01-08 Landfill and Partial Closure of 07 acres of land for the the Whein Town Landfill construction of the new Sanitary Lnadfill at Cheesemanburg MCC-PIU-REF-4 / Construction of the Construction of perimeter wall Cheesemanburg Regional Single Stage - One 2020-02- TF / A5269 Prior Request for Bids Open - National 750,000.00 0.00 Canceled 2019-04-15 2019-04-20 2019-06-01 2019-07-01 2019-08-05 at Whein Town Landfill Site( Landfill and Partial Closure of Envelope 01 Fencing) the Whein Town Landfill LR-MCC-86280-CW-RFP / Construction of the Under Design and Construction of Cheesemanburg Regional Request for Single Stage - Two 2021-12- TF / A5269 Prior Open - International 4,300,000.00 0.00 Implementat 2019-10-10 2020-01-10 2019-12-26 2020-11-05 2019-12-26 2021-02-03 2019-10-15 2020-01-14 2020-03-05 2020-05-18 2020-06-22 the Cheesemnburg Regional Landfill and Partial Closure of Proposals Envelope 14 ion Landfill the Whein Town Landfill MCC-CLUS /WKS-4/08/19 / Construction of the Construction of Perimeter Wall- Cheesemanburg Regional Single Stage - One 2020-08- TF / A5269 Post Request for Bids Open - National 75,000.00 269,177.65 Signed 2019-10-18 2019-10-15 2019-10-23 2019-10-21 2019-12-04 2019-11-14 2020-01-03 2019-12-11 2020-02-07 2019-12-12 Fence around the Sanitary Landfill and Partial Closure of Envelope 05 Landfill at the Whein Town the Whein Town Landfill GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MCC-PIU-REF-11 / Supply Waste Collection and Single Stage - One / Post Request for Bids Open - National 273,515.00 0.00 Canceled 2017-09-30 2017-10-05 2017-11-16 2017-12-16 2018-01-20 2018-07-19 and Delivery of Fuel Disposal Envelope MCC-PIU-SWM-F-REF-11 / Waste Collection and Supply and Delivery of fuel TF / A5269 Prior Direct Selection Direct 273,515.00 0.00 Canceled 2017-10-09 2017-10-14 2017-11-18 2018-05-17 Disposal for Solid Waste Equipment MCC-PIU-REF-8 / Supply and Waste Collection and Single Stage - One Delivery of Garbage Collection / Prior Request for Bids Open - International 2,000,000.00 0.00 Canceled 2017-10-05 2017-10-10 2017-11-21 2017-12-21 2018-01-25 2018-07-24 Disposal Envelope Equipment LR-MCC-37773-GO-RFB / Waste Collection and Single Stage - One Supply and Delivery of Solid TF / A5269 Prior Request for Bids Open - International 2,000,000.00 1,222,978.00 Signed 2017-11-27 2017-12-05 2017-12-02 2018-01-31 2018-01-13 2018-03-07 2018-02-12 2018-05-01 2018-03-19 2018-05-25 2018-09-15 Disposal Envelope Waste Collection Equipment LR-MCC-54497-GO-RFB / Construction of the Supply and Delivery of Solid Cheesemanburg Regional Single Stage - One TF / A5269 Prior Request for Bids Open - International 1,054,700.00 0.00 Canceled 2018-04-20 2018-05-08 2018-04-25 2018-05-29 2018-06-06 2018-07-06 2018-08-10 2019-02-06 Waste Collection Equipment Landfill and Partial Closure of Envelope Phase 2 the Whein Town Landfill Page 1 LR-MCC-60200-GO-RFQ / Construction of the Supply , Delivery and Cheesemanburg Regional Request for Single Stage - One TF / A5269 Post Open - National 30,000.00 15,800.00 Signed 2018-05-05 2018-07-18 2018-06-30 2018-06-13 2018-12-27 Installation of GPS Trackers Landfill and Partial Closure of Quotations Envelope (System) the Whein Town Landfill Construction of the MCC-PIU-REF-9 / Purchase Cheesemanburg Regional Request for Single Stage - One TF / A5269 Post Open - National 27,920.00 5,472.50 Signed 2018-10-23 2018-12-18 2018-12-17 2019-06-16 of Office Supplies Landfill and Partial Closure of Quotations Envelope the Whein Town Landfill LR-MCC-73837-GO-RFB / Supply and Delivery of Solid Waste Collection and Single Stage - One TF / A5269 Post Request for Bids Open - National 650,000.00 639,265.00 Signed 2018-08-31 2018-08-30 2018-09-05 2018-10-24 2018-10-17 2018-10-19 2018-11-16 2019-01-25 2018-12-21 2019-02-20 2019-06-19 Waste Collection Equiment Disposal Envelope Phase II MCC-PIU-REF-10 / Purchase Waste Collection and Request for Single Stage - One TF / A5269 Post Open - National 17,920.00 0.00 Canceled 2019-04-02 2019-05-28 2019-11-24 of Office Furniture Disposal Quotations Envelope LR-MCC-40785-GO-RFQ / Supply and Delivery of Waste Collection and Request for Single Stage - One TF / A5269 Post Open - National 10,000.00 0.00 Canceled 2019-07-03 2019-08-28 2020-02-24 Chemicals for the Disposal Quotations Envelope Maintenance of Landfill facility MCC-CLUS/GDS-17-08/19 / Motorola for the improvement Waste Collection and Request for Single Stage - One of communication in support TF / A5269 Post Open - National 45,000.00 0.00 Canceled 2019-09-28 2019-11-23 2020-05-21 Disposal Quotations Envelope of Solid Waste Collection and Coordination of Equipment LR-MCC-139692-GO-RFQ / Supply and Delivery of Parts Waste Collection and Request for Single Stage - One for the upgrading of TF / A5269 Post Open - National 60,000.00 0.00 Canceled 2019-10-23 2019-10-21 2019-12-18 2020-06-15 Disposal Quotations Envelope Weighbridges at the Transfer Stations and Landfill. LR-MCC-142288-GO-RFQ / Supply and Delivery of Parts Waste Collection and Request for Single Stage - One for the upgrading of TF / A5269 Post Limited 60,000.00 71,380.00 Signed 2019-10-30 2019-11-01 2019-12-25 2019-11-25 2020-02-12 Disposal Quotations Envelope Weighbridges at the Transfer Stations and Landfill LR-MCC-166931-GO-RFQ / Motorola for the improvement Waste Collection and Request for Single Stage - One of communication in support TF / A5269 Post Open - National 50,000.00 75,000.00 Signed 2020-04-15 2020-06-10 2020-04-24 2020-12-07 Disposal Quotations Envelope of Solid Waste Collection and Coordination of Equipment MCC-PIU COVID-19- RESPONSE -GO-RFQ-2 / Waste Collection and Request for Single Stage - One Supply and Delivery of TF / A5269 Post Limited 87,500.00 175,000.00 Signed 2020-05-31 2020-05-28 2020-07-26 2020-06-10 2021-01-22 Disposal Quotations Envelope fabricated skip buckets for waste spillage MCC-PIU COVID-19- Institutional Capacity RESPONSE -GO-RFQ-3 / Request for Single Stage - One TF / A5269 Development and Project Post Limited 40,000.00 46,935.00 Signed 2020-05-31 2020-05-28 2020-07-26 2020-06-11 2021-01-22 Supply and Delivery of safety Quotations Envelope Management gears for Casual Laborers MCC-PIU COVID-19- RESPONSE -GO- RFQ-4 / Supply and Delivery of Waste Collection and Request for Single Stage - One TF / A5269 Post Limited 25,000.00 29,960.00 Signed 2020-05-31 2020-05-28 2020-07-26 2020-06-09 2021-01-22 Chemicals for the Fumigation Disposal Quotations Envelope of solid waste collection points and transfers stations MCC-PIU COVID-19- RESPONSE -GO-RFQ-5 / Supply and Delivery of Waste Collection and Request for Single Stage - One TF / A5269 Post Limited 15,000.00 7,445.00 Signed 2020-06-01 2020-05-28 2020-07-27 2020-06-08 2021-01-23 Disinfectants and Hand Disposal Quotations Envelope sanitizers for key Actors on solid waste collection MCC-PIU COVID-19- RESPONSE -GO-RFQ-6 / Under Waste Collection and Supply and delivery of fuel for TF / A5269 Prior Direct Selection Direct 225,000.00 0.00 Implementati 2020-05-28 2020-06-19 2020-06-02 2020-07-10 2020-07-07 2021-01-03 Disposal solid waste collection on equipment for MCC and PCC MCC-PIU COVID-19- Institutional Capacity RESPONSE -GO-RFQ-7 / Request for Single Stage - One TF / A5269 Development and Project Post Limited 35,000.00 14,940.00 Signed 2020-06-03 2020-05-28 2020-07-29 2020-06-09 2021-01-25 Supply and Delivery of hands Quotations Envelope Management tools for waste collection LR-MCC-186292-GO-RFQ / Institutional Capacity Request for Single Stage - One Supply and Delivery of two (2) TF / A5269 Development and Project Post Limited 62,000.00 72,600.00 Signed 2020-08-15 2020-08-06 2020-10-10 2020-08-21 2021-04-08 Quotations Envelope Pieces Double Cabin Pickups Management LR-MCC-190417-GO-RFQ / Upgrading of Solar System at Waste Collection and Request for Single Stage - One TF / A5269 Post Limited 23,000.00 28,198.00 Signed 2020-09-20 2020-08-28 2020-11-15 2020-10-05 2021-05-14 the Sanitary Landfill at Whein Disposal Quotations Envelope Town LR-MCC-190551-GO-RFQ / Institutional Capacity Request for Single Stage - One Supply and Delivery of TF / A5269 Development and Project Post Limited 30,000.00 17,504.00 Signed 2020-09-27 2020-09-03 2020-11-22 2020-09-15 2021-05-21 Quotations Envelope General Office Supplies Management CLUS-PCC-G0-4-RFB / Supply and Delivery of phase Waste Collection and Single Stage - One TF / A5269 Post Request for Bids Open - National 556,000.00 507,625.00 Signed 2020-10-20 2020-10-14 2020-10-25 2020-10-15 2020-12-06 2020-11-30 2021-01-05 2021-02-26 2021-02-09 2021-04-08 2021-08-08 -III Solid Waste Collection Disposal Envelope Equipment for PCC LR-MCC-203479-GO-RFQ / SUPPLY AND DELIVERY Institutional Capacity Under Request for Single Stage - One MATERIALS TO FACILITATE TF / A5269 Development and Project Post Limited 50,000.00 0.00 Implementati 2020-11-21 2020-11-25 2021-01-16 2021-07-15 Quotations Envelope PUBLIC AWARENESS AND Management on STAKEHOLDERS ENGAGEMENT Page 2 MCC-PIU COVID-19- RESPONSE –GO-RFQ-1 / Institutional Capacity Request for Single Stage - One Supply and Delivery of spare TF / A5269 Development and Project Post Limited 60,000.00 0.00 Canceled 2021-01-04 2021-03-01 2021-08-28 Quotations Envelope parts for the repair of SW Management Collection equipment CLUS-MCC-GO-4-RFQ / Under Supply and Delivery of phase Waste Collection and Request for Single Stage - One TF / A5269 Post Limited 195,000.00 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 -III Solid Waste Collection Disposal Quotations Envelope on Equipment for MCC CLUS-MCC-GO-5-RFQ / Supply and Delivery of two (2) Pending Waste Collection and Request for Single Stage - One Double Cabin Pickups in TF / A5269 Post Limited 55,000.00 0.00 Implementati 2021-02-02 2021-03-30 2021-09-26 Disposal Quotations Envelope support of Solid Waste on Collection for MCC NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Construction of the MCC-PIU-REF-14 / Cheesemanburg Regional Single Stage - One Operations and Management / Post Request for Bids Open - National 161,280.00 0.00 Canceled 2017-10-05 2017-10-01 2017-10-10 2017-10-03 2017-11-21 2017-12-21 2018-01-25 2018-07-24 Landfill and Partial Closure of Envelope of Weighbridges the Whein Town Landfill MCC-PIU-REF-13 / Pushing Waste Collection and Single Stage - One and Compacting Solid Waste / Post Request for Bids Open - National 336,000.00 417,380.28 Terminated 2017-10-03 2017-10-05 2017-10-08 2017-11-19 2017-10-30 2017-12-19 2018-05-28 2018-01-23 2018-07-22 Disposal Envelope at Landfill Construction of the MCC-PIU-REF-12 / Public Cheesemanburg Regional Single Stage - One Awareness and Citizens / Post Request for Bids Open - National 70,000.00 0.00 Canceled 2017-10-30 2017-11-04 2017-12-16 2018-01-15 2018-02-19 2018-08-18 Landfill and Partial Closure of Envelope Engagement the Whein Town Landfill MCC-PIU-REF-15 / Supply Waste Collection and Single Stage - One and Delivery Equipment Rental / Post Request for Bids Open - National 158,400.00 0.00 Canceled 2017-10-06 2017-10-13 2017-10-11 2017-11-22 2017-12-22 2018-01-26 2018-07-25 Disposal Envelope Services Construction of the LR-MCC-36212-NC-RFB / Cheesemanburg Regional Single Stage - One Public Awareness and Citizens TF / A5269 Post Request for Bids Open - National 70,000.00 0.00 Canceled 2019-07-31 2019-08-05 2019-09-16 2019-10-16 2019-11-20 2020-05-18 Landfill and Partial Closure of Envelope Engagement the Whein Town Landfill MCC-COVID-19-RESPONSE –NCS- CDS-1 / The provision Institutional Capacity of orientation for key waste TF / A5269 Development and Project Prior Direct Selection Direct 6,000.00 0.00 Canceled 2020-05-29 2020-06-03 2020-07-08 2021-01-04 collection players on Management awareness regarding COVID- 19 MCC-COVID-19-RESPONSE –NCS-CDS-2 / The development of Jingles and Institutional Capacity messages of public awareness TF / A5269 Development and Project Prior Direct Selection Direct 20,000.00 16,000.00 Signed 2020-05-29 2020-06-04 2020-06-03 2020-07-16 2020-07-08 2020-09-16 2021-01-04 on the prevention of COVID- Management 19 relative to improper solid waste management CLUS-MCC-EQUP- Pending SR/NC/01/21 / Repair of four Waste Collection and Request for Single Stage - One TF / A5269 Post Limited 50,000.00 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 (4) broken down Solid waste Disposal Quotations Envelope on Collection Equipment for MCC CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Construction of the LR-MCC-36206-CS-CQS / Consultant Cheesemanburg Regional Hydro geological and Geo TF / A5269 Prior Qualification Open - National 190,000.00 322,740.00 Signed 2017-11-20 2017-12-19 2017-12-11 2018-01-16 2018-01-24 2018-02-28 2018-02-23 2018-05-06 2018-03-30 2018-06-06 2018-09-26 Landfill and Partial Closure of technical Investigation Selection the Whein Town Landfill Institutional Capacity Consultant LR-MCC-40764-CS-CQS / TF / A5269 Development and Project Post Qualification Open - National 15,000.00 15,000.00 Signed 2017-12-29 2018-01-16 2018-01-19 2018-03-04 2018-04-06 2018-04-03 2018-04-09 2018-05-08 2018-05-04 2018-11-04 Project Financial Audit Management Selection Construction of the Consultant MCC-PIU-REF-27 / Design of Cheesemanburg Regional TF / A5269 Post Qualification Open - National 300,000.00 0.00 Canceled 2018-10-26 2018-11-16 2018-12-30 2019-01-29 2019-03-05 2019-09-01 Cheesemanburg Landfill Landfill and Partial Closure of Selection the Whein Town Landfill MCC-CLUS/CS-16/09/09 / Construction of the Consultant Partial Closure Studies of the Cheesemanburg Regional TF / A5269 Post Qualification Limited 150,000.00 0.00 Canceled 2019-09-27 2019-10-08 2019-10-11 2019-12-09 2019-11-10 2019-12-15 2020-06-12 Sanitary Landfill at Whein Landfill and Partial Closure of Selection Town the Whein Town Landfill MCC-CLUS/CS-15/09/19 / Construction of the Feasibility Study for an Consultant Cheesemanburg Regional improved Solid Waste TF / A5269 Post Qualification Limited 100,000.00 0.00 Canceled 2019-10-18 2019-10-15 2019-11-01 2019-12-01 2020-01-05 2020-07-03 Landfill and Partial Closure of Management Strategies for Selection the Whein Town Landfill Greater Monrovia LR-MCC-152344-CS-CQS / Consultancy Services for Institutional Capacity Consultant Under Capacity Building for Project TF / A5269 Development and Project Post Qualification Open - National 112,000.00 0.00 2020-01-17 2020-03-10 2020-02-07 2020-10-08 2020-03-22 2020-04-21 2020-05-26 2020-11-22 Implementation Beneficiaries- MCC, PCC, & Management Selection Surrounding Townships LR-MCC-152345-CS-CQS / Consultancy Services for the Institutional Capacity Consultant conduct of An Annual Solid TF / A5269 Development and Project Post Qualification Open - National 100,000.00 191,424.00 Signed 2020-04-29 2020-07-21 2020-05-20 2020-07-22 2020-07-03 2021-01-08 2020-08-02 2021-03-17 2020-09-06 2021-03-30 2021-03-05 Waste Performance Survey in Management Selection Greater Monrovia Page 3 LR-MCC-178047-CS-CQS / Consultancy Services for Engineering Design, Preparation of Tender Construction of the Consultant Documents and Construction Cheesemanburg Regional Under TF / A5269 Post Qualification Open - National 100,000.00 0.00 2020-07-30 2020-07-13 2020-08-20 2020-07-22 2020-10-03 2021-02-19 2020-11-02 2020-12-07 2021-06-05 Supervision for the Landfill and Partial Closure of Implementation Selection Remodeling of Two Waste the Whein Town Landfill Transfer Stations and Partial and Final Closure of the Whein Town Landfill Site MCC-PIU-REF-24 / Construction of the Consultant Supervision of the Cheesemanburg Regional Under TF / A5269 Post Qualification Open - National 80,000.00 0.00 2020-12-31 2021-02-08 2021-01-21 2021-05-01 2021-03-06 2021-04-05 2021-05-10 2021-11-06 Chesemanburg Landfil Landfill and Partial Closure of Implementation Selection Construction the Whein Town Landfill MCC-COVID-19-RESPONSE –CS-CQS-1 / The development of long-term Institutional Capacity Consultant Economic Recovery strategy TF / A5269 Development and Project Post Qualification Limited 300,000.00 0.00 Canceled 2020-11-30 2020-12-14 2021-01-13 2021-02-17 2021-08-16 and job creation in support of Management Selection SMEs and CBEs involved with solid waste management in greater Monrovia LR-MCC-190416-CS-CQS / Consultant Consulting Firm for Waste Collection and TF / A5269 Post Qualification Open - National 120,000.00 0.00 Canceled 2020-12-30 2020-12-28 2021-01-20 2021-03-05 2021-04-04 2021-05-09 2021-11-05 Independent Verification of Disposal Selection the RBF for PCC & MCC . INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Construction of the MCC-PIU-REF-23 / Individual Cheesemanburg Regional Cheesemanburg Community / Post Consultant Open 30,000.00 0.00 Canceled 2017-09-30 2017-09-29 2017-11-18 2018-05-28 2017-12-09 2018-01-13 2018-07-12 Landfill and Partial Closure of Liason Officer Selection the Whein Town Landfill Institutional Capacity Individual MCC-PIU-REF-22 / Safeguard / Development and Project Post Consultant Open 100,000.00 3,200.00 Terminated 2017-10-03 2017-10-01 2017-11-21 2017-12-12 2017-12-12 2017-12-12 2018-01-16 2018-07-15 Officer Management Selection Construction of the Individual MCC-PIU-REF-21 / Civil Cheesemanburg Regional / Post Consultant Limited 39,600.00 0.00 Canceled 2017-10-06 2017-10-03 2017-10-11 2017-11-01 2017-12-06 2018-06-04 Engineer Landfill and Partial Closure of Selection the Whein Town Landfill Construction of the Individual MCC-PIU-REF-19 / Cheesemanburg Regional / Post Consultant Limited 27,000.00 0.00 Canceled 2017-10-06 2017-10-01 2017-10-11 2017-10-24 2017-11-01 2017-10-24 2017-12-06 2018-06-04 Procurement Specialist Landfill and Partial Closure of Selection the Whein Town Landfill Construction of the MCC-PIU-REF-20 / Individual Cheesemanburg Regional Administrative and Accounts / Post Consultant Limited 27,000.00 0.00 Canceled 2017-10-06 2017-10-03 2017-10-11 2017-11-01 2017-12-06 2018-06-04 Landfill and Partial Closure of Officer Selection the Whein Town Landfill Construction of the Individual MCC-PIU-REF-18 / Project Cheesemanburg Regional / Post Consultant Limited 54,000.00 0.00 Canceled 2017-10-10 2017-10-01 2017-10-15 2017-11-05 2017-12-10 2018-06-08 Coordinator Landfill and Partial Closure of Selection the Whein Town Landfill MCC-PIU-REF-25 / Construction of the Individual Hydrogeological and Cheesemanburg Regional / Post Consultant Open 80,000.00 0.00 Canceled 2017-09-29 2017-10-01 2017-11-17 2017-12-08 2018-01-12 2018-07-11 Geotechnical Study at Landfill and Partial Closure of Selection Cheesemanburg the Whein Town Landfill Institutional Capacity LR-MCC-36777-CS-CDS / TF / A5269 Development and Project Prior Direct Selection Direct 108,000.00 108,000.00 Under Review 2017-06-16 2018-07-19 2017-09-26 2017-09-29 2017-09-01 2018-03-28 Project Coordinator Management Institutional Capacity LR-MCC-36784-CS-CDS / TF / A5269 Development and Project Prior Direct Selection Direct 54,000.00 54,000.00 Under Review 2017-06-16 2017-09-26 2017-09-01 2017-09-29 2017-09-01 2018-03-28 Procurement Specialist Management Institutional Capacity MCC-REF-3 / Account TF / A5269 Development and Project Prior Direct Selection Direct 54,000.00 54,000.00 Signed 2017-06-16 2018-07-19 2017-09-26 2017-09-01 2017-09-29 2017-09-01 2018-03-28 Officer Management Institutional Capacity LR-MCC-36791-CS-CDS / TF / A5269 Development and Project Prior Direct Selection Direct 79,200.00 79,200.00 Signed 2017-06-16 2018-07-19 2017-09-26 2017-09-29 2017-09-01 2018-03-28 Solid Waste Engineer Management Construction of the Individual MCC-PIU-REF-26 / Urban Cheesemanburg Regional TF / A5269 Post Consultant Open 80,000.00 0.00 Canceled 2017-12-29 2018-01-16 2018-02-16 2018-03-09 2018-04-13 2018-10-10 Management Studies Landfill and Partial Closure of Selection the Whein Town Landfill MCC-PIU-REF-30 / Quarterly Construction of the Individual Groundwater and Leachate Cheesemanburg Regional TF / A5269 Post Consultant Open 75,000.00 16,000.00 Signed 2017-12-28 2018-01-16 2018-02-15 2018-04-27 2018-03-08 2018-04-27 2018-04-12 2018-05-01 2018-10-09 Sampling at the Landfill and Partial Closure of Selection Cheesemanburg Landfill the Whein Town Landfill Construction of the MCC-PIU-REF-32 / Design of Individual Cheesemanburg Regional Road exension to the TF / A5269 Post Consultant Open 10,000.00 13,200.00 Signed 2019-04-15 2018-04-26 2019-06-03 2018-10-08 2019-06-24 2018-10-09 2019-07-29 2018-10-10 2020-01-25 Landfill and Partial Closure of Cheesemanburg community Selection the Whein Town Landfill Construction of the Individual MCC-PIU-REF-37 / Financial Cheesemanburg Regional / Post Consultant Open 60,000.00 0.00 Canceled 2018-01-23 2018-03-13 2018-04-03 2018-05-08 2018-11-04 Audits Landfill and Partial Closure of Selection the Whein Town Landfill MCC-PIU-REF-29 / Quarterly Construction of the Individual Groundwater and Leachate Cheesemanburg Regional / Post Consultant Open 75,000.00 0.00 Canceled 2018-03-25 2017-12-20 2018-05-13 2018-06-03 2018-07-08 2019-01-04 Sampling at the Whein Town Landfill and Partial Closure of Selection Landfill the Whein Town Landfill Page 4 LR-MCC-64546-CS-INDV / Institutional Capacity Individual Local Project Consultant for TF / A5269 Development and Project Post Consultant Open 24,000.00 0.00 Canceled 2018-06-14 2018-06-01 2018-08-02 2018-08-23 2018-09-27 2019-03-26 the Monrovia City Corporation Management Selection LR-MCC-64548-CS-INDV / Institutional Capacity Individual Legal & Safety Consultant for TF / A5269 Development and Project Post Consultant Open 24,000.00 0.00 Canceled 2018-06-19 2018-06-01 2018-08-07 2018-08-28 2018-10-02 2019-03-31 the City of Monrovia Management Selection Construction of the LR-MCC-80461-CS-INDV / Individual Cheesemanburg Regional Under Cheesemanburg Community TF / A5269 Post Consultant Open 30,000.00 0.00 2018-11-30 2018-10-17 2019-01-18 2019-01-31 2019-02-08 2019-02-14 2019-03-15 2019-09-11 Landfill and Partial Closure of Implementation Liaison Officer (CCLO) Selection the Whein Town Landfill Construction of the Individual LR-MCC-26957-CS-INDV / Cheesemanburg Regional TF / A5269 Post Consultant Open 50,000.00 0.00 Canceled 2018-12-20 2018-11-14 2019-02-07 2019-02-28 2019-04-04 2019-10-01 Whein Town Closure Design Landfill and Partial Closure of Selection the Whein Town Landfill LR-MCC-93652-CS-INDV / Institutional Capacity Individual Consultancy Service for TF / A5269 Development and Project Post Consultant Open 25,000.00 0.00 Canceled 2019-01-30 2019-03-04 2019-03-20 2019-04-10 2019-05-15 2019-11-11 Financial Assessment for the Management Selection waste Sector LR-MCC-95081-CS-CDS / Construction of the Consultancy Services for the Cheesemanburg Regional TF / A5269 Prior Direct Selection Direct 45,000.00 0.00 Under Review 2019-01-25 2019-03-04 2019-02-04 2019-04-29 2019-04-10 2019-10-07 Provision of Technical Landfill and Partial Closure of Support to PIU the Whein Town Landfill Construction of the MCC-PIU-REF-31 / Safeguard Individual Cheesemanburg Regional Audit of the Whein Town TF / A5269 Post Consultant Open 75,000.00 0.00 Canceled 2019-03-29 2019-05-17 2019-06-07 2019-07-12 2020-01-08 Landfill and Partial Closure of Landfill Selection the Whein Town Landfill Construction of the Individual Cheesemanburg Regional MCC-PIU-REF-28 / M&E TF / A5269 Post Consultant Open 40,000.00 0.00 Canceled 2019-06-30 2019-08-18 2019-09-08 2019-10-13 2020-04-10 Landfill and Partial Closure of Selection the Whein Town Landfill Construction of the MCC-PIU-REF-33 / Individual Cheesemanburg Regional Preparation of Solid Waste TF / A5269 Post Consultant Open 80,000.00 0.00 Canceled 2018-10-24 2018-11-08 2018-12-12 2019-01-02 2019-02-06 2019-08-05 Landfill and Partial Closure of Management Strategy Selection the Whein Town Landfill Construction of the MCC-PIU-REF-36 / Whein Individual Cheesemanburg Regional Town Permanent Closure / Post Consultant Open 50,000.00 0.00 Canceled 2019-06-30 2019-08-18 2019-09-08 2019-10-13 2020-04-10 Landfill and Partial Closure of Supervision Selection the Whein Town Landfill CLUS/CS-8/IC/PAC/09/19 / Institutional Capacity Individual Public Awareness Consultant TF / A5269 Development and Project Post Consultant Open 36,000.00 36,000.00 Signed 2019-09-23 2019-10-09 2019-11-11 2020-02-28 2019-12-02 2020-03-02 2020-01-06 2020-04-01 2020-07-04 (PAC)/ Communication Management Selection Specialist Construction of the MCC-PIU-REF-35 / Whein Individual Cheesemanburg Regional Town Partial Closure TF / A5269 Post Consultant Open 50,000.00 0.00 Canceled 2018-12-14 2018-12-18 2019-02-01 2019-02-22 2019-03-29 2019-09-25 Landfill and Partial Closure of Supervision Selection the Whein Town Landfill LR-MCC-64547-CS-INDV / Institutional Capacity Individual Financial and Revenue TF / A5269 Development and Project Post Consultant Open 24,000.00 0.00 Canceled 2018-06-15 2018-06-01 2018-08-03 2018-08-24 2018-09-28 2019-03-27 Consultant for the City of Management Selection Monrovia CLUS/CS-9/IC/TSWS/09/19 / Institutional Capacity Individual Technical Solid Waste TF / A5269 Development and Project Prior Consultant Open 42,000.00 0.00 Canceled 2019-10-25 2019-10-24 2019-12-13 2020-01-03 2020-02-07 2020-08-05 Specialist Management Selection LR-MCC-143088-CS-INDV / CONSULTANCY SERVICE FOR Construction of the Individual THE ENVIRONMENTAL AND Cheesemanburg Regional TF / A5269 Post Consultant Open 50,000.00 0.00 Canceled 2019-10-31 2019-12-19 2020-01-09 2020-02-13 2020-08-11 SOCIAL AUDIT OF WHEIN Landfill and Partial Closure of Selection TOWN SANITARY LANDFILL the Whein Town Landfill SITE LR-MCC-150242-CS-INDV / Recruitment of a consultant Construction of the for the conduct of an Individual Cheesemanburg Regional environmental and social TF / A5269 Post Consultant Open 50,000.00 53,300.00 Signed 2019-12-16 2019-12-13 2020-02-03 2020-04-27 2020-02-24 2020-05-15 2020-03-30 2020-06-03 2020-09-26 Landfill and Partial Closure of audit of the Whein town Selection the Whein Town Landfill landfill site and the two solid waste transfer stations. LR-MCC-139704-CS-CDS / Institutional Capacity Website Development and TF / A5269 Development and Project Post Direct Selection Direct 10,000.00 9,500.00 Signed 2020-04-24 2020-05-26 2020-05-04 2020-07-20 2020-07-08 2020-07-22 2021-01-04 Database System for the CLUS Management Project LR-MCC-166929-CS-CDS / Consultancy Services for the Institutional Capacity training of M&E Staff for MCC TF / A5269 Development and Project Prior Direct Selection Direct 20,000.00 20,000.00 Signed 2020-04-15 2020-05-17 2020-04-25 2020-07-15 2020-06-29 2020-12-16 2020-12-26 & PCC on the Result Based Management Finance (RBF) LR-MCC-166930-CS-INDV / Institutional Capacity Individual Financial and Revenue TF / A5269 Development and Project Post Consultant Open 30,000.00 33,600.00 Signed 2020-04-22 2020-04-23 2020-06-10 2020-08-31 2020-07-01 2020-09-24 2020-08-05 2020-10-05 2021-02-01 Consultant for the Monrovia Management Selection City Corporation LR-MCC-190410-CS-INDV / Individual Consultant for the Development of Livelihood Construction of the Individual Restoration Plan (LRP) Cheesemanburg Regional TF / A5269 Post Consultant Open 40,000.00 45,000.00 Signed 2020-11-30 2020-10-13 2021-01-18 2021-02-22 2021-02-08 2021-02-26 2021-03-15 2021-03-11 2021-09-11 Preparation for Project Landfill and Partial Closure of Selection Affected Persons (PAPs) for the Whein Town Landfill the Closure of the Whein Town Sanitary Landfill Site CLUS-M&E-1/GPRA/01/21 / Waste Collection and Senior Data Analyst for the TF / A5269 Post Direct Selection Direct 13,800.00 13,800.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal GPRA under the CLUS Project Page 5 CLUS-M&E-2/GPRA/01/21 / Waste Collection and Assistant Data Analyst for the TF / A5269 Post Direct Selection Direct 9,000.00 9,000.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal GPRA under the CLUS Project CLUS-M&E-4/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS -M&E-3/GPRA/01/21 / Waste Collection and Assistant Data Analyst for the TF / A5269 Post Direct Selection Direct 9,000.00 9,000.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal GPRA under the CLUS Project CLUS-M&E-15/GPRA/01/21 / Waste Collection and M&E Assistant for the GPRA TF / A5269 Post Direct Selection Direct 4,200.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&18/GPRA/01/21 / Waste Collection and Assistant Data Officer for the TF / A5269 Post Direct Selection Direct 4,200.00 4,200.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal GPRA under the CLUS Project CLUS-M&E -5/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-6/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-7/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-8/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-9/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-10/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-11/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-21 2021-09-11 Disposal under the CLUS Project CLUS-M&E-12/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 4,200.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-13/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 4,200.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-14/GPRA/01/21 / Waste Collection and Data Officer for the GPRA TF / A5269 Post Direct Selection Direct 8,400.00 8,400.00 Signed 2020-12-30 2021-01-19 2021-01-09 2021-03-05 2021-03-15 2021-03-16 2021-09-11 Disposal under the CLUS Project CLUS-M&E-16/GPRA/01/21 / Waste Collection and Assistant Data Officer for the TF / A5269 Post Direct Selection 4,200.00 4,200.00 Signed 2021-02-25 2021-03-04 2021-03-07 2021-03-05 2021-05-11 2021-03-16 2021-11-07 Disposal GPRA under the CLUS Project LR-MCC-220914-CS-CDS / Independent Verification Agency/Assessor (IVA) for the Monitoring and Evaluation of Solid Waste Management Waste Collection and Under TF / A5269 Prior Direct Selection Direct 120,000.00 0.00 2021-02-28 2021-03-01 2021-03-10 2021-06-11 2021-05-14 2021-11-10 Performance in Monrovia and Disposal Implementation Paynesville PIU/MCC- CLUS Project- Monrovia City Corporation (MCC) LR-MCC-222120-CS-INDV / Individual Waste Collection and Under Technical Solid Waste TF / A5269 Post Consultant Limited 42,000.00 0.00 2021-03-05 2021-03-09 2021-03-10 2021-03-31 2021-05-05 2021-11-01 Disposal Implementation Specialist Selection CLUS-M&E-17/GPRA/01/21 / Waste Collection and Under Assistant Data Officer for the TF / A5269 Post Direct Selection Direct 4,200.00 0.00 2021-02-25 2021-03-01 2021-03-07 2021-05-11 2021-11-07 Disposal Implementation GPRA under the CLUS Project LR-MCC-233264-CS-INDV / Institutional Capacity Individual Under Project Coordinator for the TF / A5269 Development and Project Prior Consultant Limited 120,000.00 0.00 2021-05-17 2021-05-21 2021-05-22 2021-06-12 2021-07-17 2022-01-13 Implementation CLUS Project Management Selection Page 6 PROCUREMENT PLAN (Textual Part) Project information: Burkina Faso- Strengthening Climate Resilience in Burkina Faso- P164078 Project Implementation agency: Permeant Secretariat of Transports (PST) Date of the Procurement Plan: January 8th,2019 Period covered by this Procurement Plan: from January– to December 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [Décret N°2017-00049/PRES/PM/MINEFID du 01/02/2017 portant procédures de passation, d’exécution et de règlement des marchés publics et des délégations de service publics au Burkina Faso], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. The National Bidding Document clause allowed to reject all bid when arithmetic error is 15% on + or – of original bid is not applied to the project. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable]; Works: [is not applicable] PROCUREMENT Burkina Faso : Strengthening Climate Resilience in Burkina Faso PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2019-01-09 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164078 GPN Date: Project Name: Strengthening Climate Resilience in Burkina Faso Loan / Credit No: IDA / V2230, IDA / D3740 Burkina Faso Hydromet PIU Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BF-PST2-127041-CW-RFQ / Under Request for Single Stage - One 2019-11- Aménagement des locaux de IDA / D3740 Project Management Post Limited 18,000.00 0.00 Implementat 2019-10-01 2019-10-31 Quotations Envelope 30 L’UGP/HYDROMET ion BF-PST2-126457-CW-DIR / Réalisation des travaux Under d'extension (R+2 et R+3) du Contingent Emergency 2020-08- IDA / D3740 Post Direct Selection Direct 944,000.00 0.00 Implementat 2019-10-01 2019-10-01 2019-10-06 2019-10-31 centre national de veille et Response Component 26 ion d’alerte précoce au profit de l’ANAM BF-HYDROMET-225124-CW- Improvement of hydromet Pending RFB / Travaux de construction Single Stage - One 2022-03- IDA / D3740 and early warning Post Request for Bids Open - National 454,545.00 0.00 Implementat 2021-07-29 2021-08-03 2021-09-02 2021-09-16 2021-10-17 du bâtiment R+1 extensible Envelope 16 infrastructure ion en R+2 de la DEIE GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-93958-GO-RFB / Acquisition de matériels Capacity building and Single Stage - One informatiques et de IDA / V2230 Post Request for Bids Open - National 98,000.00 81,665.57 Signed 2019-01-20 2019-01-24 2019-01-25 2019-03-08 2019-02-07 2019-04-07 2019-03-08 2019-05-12 2019-05-10 2019-07-11 institutional development Envelope consommables au profit du projet HYDROMET BF-PST2-93961-GO-RFQ / Under Acquisition de mobiliers de Capacity building and Request for Single Stage - One IDA / V2230 Post Open - National 23,636.00 0.00 Implementati 2019-01-25 2019-03-22 2019-05-21 bureau au profit de DMP, DAF institutional development Quotations Envelope on et DCMEF, DGESS BF-PST2-93967-GO-RFQ / Acquisition de téléphones Under portables cellulaires avec Capacity building and Request for Single Stage - One IDA / V2230 Post Open - National 10,200.00 0.00 Implementati 2019-01-27 2019-03-24 2019-09-20 forfait de connexion 3G + RP institutional development Quotations Envelope on et de de deux routers de connexion BF-PST2-99399-GO-RFQ / Under Request for Single Stage - One Acquisition véhicule au profit IDA / V2230 Project Management Post Limited 50,000.00 41,800.32 Implementati 2019-02-20 2019-02-21 2019-04-03 2019-05-18 Quotations Envelope du projet HYDROMET on BF-PST2-126800-GO-RFQ / Acquisition de fournitures de Under Request for Single Stage - One bureau et de de produits IDA / D3740 Project Management Post Limited 12,000.00 0.00 Implementati 2019-09-03 2019-10-29 2019-11-13 Quotations Envelope d’entretien au profit de on l’UGP/HYDROMET (2 lots) BF-PST2-127014-GO-RFQ / Under Acquisition d'un groupe Request for Single Stage - One IDA / D3740 Project Management Post Limited 16,000.00 0.00 Implementati 2019-09-21 2019-10-23 2019-11-22 électrogène au profit de Quotations Envelope on l'UGP/HYDROMET BF-PST2-127039-GO-RFQ / Under Request for Single Stage - One Acquisition de coffres forts au IDA / D3740 Project Management Post Limited 3,000.00 0.00 Implementati 2019-09-21 2019-10-26 2019-11-25 Quotations Envelope profit de l'UGP/HYDROMET on BF-PST2-127044-GO-RFQ / Acquisition d'un véhicule pick- Request for Single Stage - One IDA / D3740 Project Management Post Limited 50,000.00 0.00 Canceled 2019-10-06 2019-02-21 2019-11-01 2020-01-30 up (Double cabine 4X4) au Quotations Envelope profit de l'UGP/HYDROMET BF-PST2-126826-GO-RFQ / Acquisition de mobiliers de Request for Single Stage - One IDA / D3740 Project Management Post Limited 20,000.00 14,719.97 Completed 2019-10-06 2019-01-22 2019-11-03 2019-05-31 2019-12-03 2019-07-05 bureau au profit de Quotations Envelope l’UGP/HYDROMET BF-PST2-126831-GO-RFQ / Travaux câblage du réseau Request for Single Stage - One IDA / D3740 Project Management Post Limited 16,000.00 0.00 Canceled 2019-10-19 2019-11-14 2019-12-14 informatique du bâtiment de Quotations Envelope l’UGP/HYDROMET BF-PST2-134929-GO-RFQ / Under Prestation de service de Request for Single Stage - One IDA / D3740 Project Management Post Limited 6,300.00 0.00 Implementati 2019-09-26 2019-10-20 2020-06-16 gardiennage au profit de Quotations Envelope on l’UGP/HYDROMET BF-PST2-126832-GO-RFQ / Pending Connexion du bâtiment de IDA / D3740 Project Management Post Direct Selection Direct 5,600.00 0.00 Implementati 2019-10-03 2019-10-08 2019-10-31 2019-11-30 l’UGP/HYDROMET au RESINA on BF-PST2-126323-GO-RFQ / Acquisition et paramétrage Pending d’un logiciel de gestion IDA / D3740 Project Management Post Direct Selection Direct 39,500.00 0.00 Implementati 2020-02-03 2020-02-08 2020-03-06 2020-05-05 financier et comptable on TOM2PRO au profit de l'UGP/HYDROMET Page 1 BF-PST2-143146-GO-RFQ / Pending Acquisition et installation d'un Request for Single Stage - One IDA / D3740 Project Management Post Limited 30,000.00 0.00 Implementati 2020-02-22 2020-03-21 2020-05-05 kit de vidéo conférence au Quotations Envelope on sein de l’UGP/HYDROMET BF-PST2-156791-GO-RFB / Acquisition d’équipements (capteurs de température, capteurs d’humidité relative, Under capteurs de vitesse et Capacity building and Single Stage - One IDA / D3740 Post Request for Bids Open - National 407,450.00 0.00 Implementati 2020-05-18 2020-09-14 2020-05-23 2020-10-12 2020-07-04 2020-08-03 2020-09-07 2021-03-06 direction du vent et capteurs institutional development Envelope on d’insolation) pour les stations météorologiques automatiques au profit de l'ANAM BF-PST2-156793-GO-RFQ / Acquisition de grilles Pending métalliques pour la protection Capacity building and Request for Single Stage - One IDA / D3740 Post Limited 32,000.00 0.00 Implementati 2020-03-21 2020-04-29 2020-06-28 des stations institutional development Quotations Envelope on agrométéorologiques au profit de l'ANAM BF-PST2-134571-GO-RFQ / Acquisition de soixante un Enhancement of service Request for Single Stage - One (61) capteurs pour les IDA / D3740 delivery and warnings to Post Limited 80,026.00 0.00 Canceled 2019-10-15 2019-11-19 2020-01-18 Quotations Envelope mesures de l’insolation au users and communities profit au profit de l’ANAM BF-PST2-156795-GO-RFQ / Acquisition et installation de postes pluviométriques Pending automatiques pour accroître Capacity building and Request for Single Stage - One IDA / D3740 Post Limited 35,800.00 0.00 Implementati 2020-04-06 2020-05-15 2020-08-13 la densité du réseau dans les institutional development Quotations Envelope on zones à fort risque d’inondation au profit de l’ANAM BF-PST2-156985-GO-RFQ / Acquisition de mobiliers de Improvement of hydromet Under Request for Single Stage - One bureaux au profit du IDA / D3740 and early warning Post Limited 56,400.00 0.00 Implementati 2020-03-31 2020-05-09 2020-07-08 Quotations Envelope SP/CONASUR et du SAP (2 infrastructure on lots) BF-PST2-156989-GO-RFQ / Improvement of hydromet Pending Acquisition de fonds Request for Single Stage - One IDA / D3740 and early warning Post Limited 9,100.00 0.00 Implementati 2020-06-13 2020-07-13 2020-09-11 documentaire pour la salle de Quotations Envelope infrastructure on documentation du SAP BF-PST2-156990-GO-RFQ / Reproduction du guide des Enhancement of service Pending risques et des menaces au Request for Single Stage - One IDA / D3740 delivery and warnings to Post Limited 45,500.00 0.00 Implementati 2020-07-25 2020-09-06 2020-11-05 profit des élus et des Quotations Envelope users and communities on représentants de l’Etat au profit de la DGPC BF-PST2-156991-GO-RFQ / Pending Acquisition de petits matériels Request for Single Stage - One IDA / D3740 Project Management Post Limited 9,100.00 0.00 Implementati 2020-03-07 2020-04-19 2020-06-18 de bureau au profit de Quotations Envelope on l’UGP/HYDROMET BF-PST2-156992-GO-RFQ / Pending Acquisition d’une Request for Single Stage - One IDA / D3740 Project Management Post Limited 1,700.00 0.00 Implementati 2020-03-17 2020-04-12 2020-06-11 motocyclette au profit de Quotations Envelope on l’UGP/HYDROMET BF-PST2-126664-GO-RFQ / Acquisition de matériels et Request for Single Stage - One consommables informatiques IDA / D3740 Project Management Post Limited 16,000.00 0.00 Canceled 2019-10-05 2019-11-04 2019-11-07 Quotations Envelope au profit de l’UUGP/HYDROMET. BF-PST2-156986-GO-RFQ / Acquisition de téléphones Improvement of hydromet Pending Request for Single Stage - One portables au profit de IDA / D3740 and early warning Post Limited 27,300.00 0.00 Implementati 2020-03-31 2020-05-09 2020-07-08 Quotations Envelope l’UGP/HYDROMET et du infrastructure on SP/CONASUR. BF-PST2-156988-GO-RFQ / Acquisition de matériels Improvement of hydromet Under Single Stage - One informatiques au profit du IDA / D3740 and early warning Post Request for Bids Open - National 373,000.00 0.00 Implementati 2020-04-09 2020-04-07 2020-04-14 2020-05-14 2020-05-28 2020-07-02 2020-09-30 Envelope SAP, du SP/CONASUR et de infrastructure on l'UGP/HYDROMET (03 lots) BF-PST2-161324-GO-RFQ / Pending Acquisition de consommable Request for Single Stage - One IDA / D3740 Project Management Post Limited 4,545.00 0.00 Implementati 2020-03-24 2020-04-30 2020-05-30 informatiques au profit de Quotations Envelope on l'UGP/HYDROMET BF-PST2-156801-GO-RFB / Acquisition du matériels roulants : -lot 1 :Véhicules tout terrain (pick-up) au profit des Improvement of hydromet Single Stage - One Agences d'exécution et de IDA / D3740 and early warning Post Request for Bids Open - International 1,593,000.00 0.00 Canceled 2020-04-03 2020-04-08 2020-05-20 2020-06-19 2020-07-24 2020-11-21 Envelope l'UGP/HYDROMET (12) infrastructure -lot 2 :Gros porteurs de 40T avec têtes et wagons au profit du SP/CONASUR (2) -lot 3: Ambulances (04) BF-PST2-156804-GO-RFB / Acquisition de matériel de secours, d'intervention et de sauvetage de victimes au Improvement of hydromet profit de la DGPC. Single Stage - One IDA / D3740 and early warning Post Request for Bids Open - International 1,036,365.00 0.00 Canceled 2020-04-03 2020-04-08 2020-05-20 2020-06-19 2020-07-24 2020-11-21 lot 1 :Engins-pompes (02) et Envelope infrastructure moto pompes remarquables (02) lot 2 : Embarcations motorisées (06) Page 2 BF-HYDROMET-172279-GO- DIR / Acquisition du matériels Improvement of hydromet Pending roulants au profit de IDA / D3740 and early warning Post Direct Selection Direct 1,150,000.00 0.00 Implementati 2020-05-14 2020-05-19 2020-06-23 2020-09-21 l'UGP/HYDROMET et des infrastructure on Agences d'exécution. BF-HYDROMET-173321-GO- DIR / Acquisition de matériel Improvement of hydromet Pending Request for Single Stage - One de secours, d'intervention et IDA / D3740 and early warning Post Limited 1,000,000.00 0.00 Implementati 2020-05-25 2020-07-07 2020-11-04 Quotations Envelope de sauvetage de victimes au infrastructure on profit de la DGPC. BF-HYDROMET-173331-GO- RFQ / Serveur pour abriter les Pending Request for Single Stage - One systèmes des bases de IDA / D3740 Project Management Post Limited 9,090.00 0.00 Implementati 2020-05-30 2020-07-05 2020-08-19 Quotations Envelope données au profit de on l'UGP/HYDROMET BF-HYDROMET-224803-GO- Improvement of hydromet Pending RFQ / Groupe électrogène de Request for Single Stage - One IDA / D3740 and early warning Post Limited 80,000.00 0.00 Implementati 2021-06-26 2021-08-06 2021-10-05 250 KVA au profit du SP- Quotations Envelope infrastructure on CONASUR BF-HYDROMET-225128-GO- RFB / Acquisition et installation de 200 éléments Improvement of hydromet Pending Request for Single Stage - One d'échelle pour les station à IDA / D3740 and early warning Post Limited 87,564.00 0.00 Implementati 2021-06-08 2021-08-03 2021-10-02 Quotations Envelope télé transmission et de 200 infrastructure on supports d'échelle IPN-180 au profit de la DGRE BF-PST2-156788-GO-RFB / Acquisition de package d’observation et de prévision (matériel de détection Capacity building and Single Stage - One IDA / D3740 Post Request for Bids Open - National 327,300.00 0.00 Canceled 2020-03-02 2020-03-07 2020-04-18 2020-04-19 2020-06-02 2020-11-29 d’orage, d’impact de foudre, institutional development Envelope de suivi de phénomènes météo extrêmes et d’alertes météo) au profit de l'ANAM BF-PST2-156984-GO-RFB / Acquisition d'équipements (unités de stockage, unités Improvement of hydromet centrales rackables, RAM, Single Stage - One IDA / D3740 and early warning Post Request for Bids Open - National 200,000.00 0.00 Canceled 2020-04-06 2020-04-11 2020-05-11 2020-05-16 2020-06-25 2020-12-22 baies, serveur) pour Envelope infrastructure l'augmentation de la capacité du supercalculateur HPC au profit de l’ANAM BF-HYDROMET-225673-GO- RFB / Equipements pour l'augmentation de la capacité Improvement of hydromet Pending du supercalculateur HPC Single Stage - One IDA / D3740 and early warning Post Request for Bids Open - International 200,000.00 0.00 Implementati 2021-07-01 2021-07-06 2021-08-17 2021-08-31 2021-10-05 2022-02-02 (unités de stockage, unités Envelope infrastructure on centrales rackables, RAM, baies, serveur) au profit de l’ANAM. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-134931-NC-RFQ / Under Request for Single Stage - One Entretien et nettoyage des IDA / D3740 Project Management Post Limited 5,000.00 0.00 Implementati 2019-09-26 2019-10-20 2020-06-16 Quotations Envelope locaux de l’UGP/HYDROMET on BF-PST2-126659-NC-DIR / Assurance maladie au profit Pending Request for Single Stage - One du personnel de IDA / D3740 Project Management Post Limited 20,000.00 0.00 Implementati 2020-02-02 2020-02-28 2021-02-22 Quotations Envelope l'UGP/HYDROMET pour le on compte de l'année 2020. BF-HYDROMET-225231-NC- DIR / Accord de partenariat avec les médias (radios Enhancement of service Pending rurales, télévision) pour la IDA / D3740 delivery and warnings to Post Direct Selection Direct 10,000.00 0.00 Implementati 2021-04-27 2021-05-02 2021-06-06 2021-12-03 diffusion de l’information users and communities on climatique en différentes langues au profit de l'ANAM CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-93979-CS-CQS / Elaboration des études Improvement of hydromet Consultant Under Architecturale et technique de IDA / D3740 and early warning Post Qualification Open - National 60,000.00 0.00 2019-01-28 2020-02-25 2019-02-18 2020-04-02 2019-04-03 2019-05-03 2019-06-07 2019-12-04 Implementation construction du bâtiment de infrastructure Selection la DEIE BF-PST2-93972-CS-CQS / Consultant Etudes de travaux de Capacity building and Under IDA / D3740 Post Qualification Open - National 40,000.00 0.00 2020-02-06 2020-10-27 2020-02-27 2021-02-01 2020-04-11 2020-05-11 2020-06-24 2020-09-22 réhabilitation des stations institutional development Implementation Selection synoptiques de l'ANAM BF-PST2-134936-CS-CQS / Réalisation d’une étude de Improvement of hydromet Consultant faisabilité en vue de la Under IDA / D3740 and early warning Post Qualification Open - National 30,000.00 0.00 2020-03-26 2020-10-27 2020-04-25 2021-02-01 2020-06-15 2020-07-06 2020-08-10 2020-12-08 dotation d’un champ solaire Implementation infrastructure Selection pour la fourniture d’électricité de l’ANAM. BF-PST2-157010-CS-CQS / Recrutement d'un cabinet Improvement of hydromet Consultant Pending pour le suivi-contrôle des IDA / D3740 and early warning Post Qualification Open - National 50,000.00 0.00 2020-07-30 2020-08-20 2020-10-03 2020-11-02 2020-12-07 2021-08-04 Implementation travaux de construction du infrastructure Selection bâtiment de la DEIE Page 3 BF-PST2-157357-CS-CQS / Recrutement d'un cabinet Least Cost Under pour l’audit externe des IDA / D3740 Project Management Post Open - National 44,000.00 0.00 2020-03-02 2020-03-02 2020-03-23 2020-04-03 2020-05-06 2020-06-05 2020-06-19 2020-07-13 2020-08-08 2020-09-07 Selection Implementation comptes des exercices 2019, 2020 et 2021 du projet HYDROMET. BF-HYDROMET-225512-CS- Consultant CQS / Mise en place d’un plan Capacity building and Pending IDA / D3740 Post Qualification Open - International 120,000.00 0.00 2021-07-15 2021-07-29 2021-09-04 2021-09-14 2021-10-19 2022-01-17 de qualité (certification) ISO institutional development Implementation Selection au profit de l'ANAM. BF-HYDROMET-225516-CS- CQS / Mise en place d’un plan Consultant de recouvrement des coûts et Capacity building and Pending IDA / D3740 Post Qualification Open - International 90,600.00 0.00 2021-07-06 2021-07-20 2021-08-26 2021-08-27 2021-10-01 2021-12-30 de mobilisation des institutional development Implementation Selection ressources au profit de l'ANAM BF-PST2-134934-CS-QCBS / Réalisation d'une étude de Enhancement of service Consultant cartographie des zones IDA / D3740 delivery and warnings to Post Qualification Open - National 140,000.00 0.00 Canceled 2019-11-04 2019-11-25 2019-12-19 2020-01-18 2020-02-22 2020-06-21 inondables au profit de la users and communities Selection DGRE BF-HYDROMET-225507-CS- Enhancement of service Consultant Pending CQS / Etude sur l'impact socio- IDA / D3740 delivery and warnings to Post Qualification Open - National 60,000.00 0.00 2021-06-21 2021-07-05 2021-08-18 2021-08-28 2021-10-02 2021-12-01 Implementation économique de l’ANAM users and communities Selection BF-HYDROMET-225510-CS- CQS / Elaboration d’un manuel d’audit interne, de la Consultant cartographie des risques, Pending IDA / D3740 Project Management Post Qualification Open - National 30,000.00 0.00 2021-07-15 2021-07-29 2021-09-11 2021-09-21 2021-10-22 2021-12-21 d’une politique de gestion des Implementation Selection risques et d’un plan d’audit interne pluriannuel du Projet HYDROMET INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-93522-CS-INDV / Elaboration du manuel Individual d'exécution et de suivi et IDA / V2230 Project Management Post Consultant Limited 50,000.00 0.00 Under Review 2019-01-15 2019-01-09 2019-01-20 2019-02-10 2019-03-17 2019-04-16 évaluation du projet Selection HYDROMET BF-PST2-93983-CS-INDV / Formation des acteurs sur la Individual Under règlementation de la Banque IDA / V2230 Project Management Post Consultant Open 40,000.00 0.00 2019-01-28 2019-02-04 2019-03-18 2019-04-01 2019-04-08 2019-05-22 2019-05-27 2019-06-06 Implementation mondiale en matière de Selection passation des marchés BF-PST2-93984-CS-INDV / Individual Recrutement d'un expert en IDA / V2230 Project Management Post Consultant Open 5,600.00 0.00 Canceled 2019-01-30 2019-01-28 2019-03-20 2019-04-10 2019-05-29 2019-09-26 protection sociale et Selection environnementale (04 mois) BF-PST2-93988-CS-INDV / Individual Recrutement d'un expert en IDA / V2230 Project Management Post Consultant Open 5,600.00 0.00 Canceled 2019-01-29 2019-03-19 2019-04-09 2019-05-28 2019-09-25 suivi et évaluation Selection BF-PST2-99402-CS-INDV / Individual Recrutement d'un expert en Pending IDA / V2230 Project Management Post Consultant Open 16,800.00 0.00 2019-02-06 2019-02-15 2019-02-16 2019-02-19 2020-02-19 protection sociale et Implementation Selection environnementale BF-PST2-99405-CS-INDV / Individual Recrutement d'un expert en IDA / V2230 Project Management Post Consultant Open 16,800.00 0.00 Under Review 2019-02-13 2019-06-11 2019-02-27 2019-03-01 2019-03-05 2020-03-04 suivi et évaluation Selection BF-PST2-113041-CS-INDV / Individual recrutement d'un Auditeur Under IDA / V2230 Project Management Post Consultant Open 16,800.00 0.00 2019-05-09 2019-08-06 2019-05-23 2019-05-25 2019-06-09 2020-06-08 interne au profit du projet Implementation Selection HYDROMET BF-PST2-118681-CS-INDV / Individual recrutement d’un Under IDA / V2230 Project Management Post Consultant Open 16,800.00 0.00 2019-06-30 2019-08-06 2019-07-17 2019-07-19 2019-08-03 2020-08-02 communicateur au profit du Implementation Selection projet HYDROMET BF-PST2-127046-CS-INDV / Recrutement d'un consultant Individual pour l’audit externe des IDA / D3740 Project Management Post Consultant Limited 20,000.00 0.00 Canceled 2019-10-28 2019-12-02 2019-11-02 2019-11-23 2019-12-28 2020-01-27 comptes de l’exercice 2019 Selection du projet HYDROMET BF-PST2-126653-CS-CDS / Suivi contrôle des travaux Contingent Emergency Under d'extension du centre national IDA / D3740 Post Direct Selection Direct 100,000.00 0.00 2019-10-01 2019-12-10 2019-10-11 2019-11-12 2020-09-07 Response Component Implementation de veille et d’alerte précoce au profit de l’ANAM BF-PST2-134935-CS-INDV / Recrutement d’un consultant Individual Capacity building and Under pour la formation des cadres IDA / D3740 Post Consultant Limited 16,000.00 0.00 2019-10-28 2020-06-18 2019-11-02 2019-11-07 2019-11-29 2019-12-29 institutional development Implementation du SAP en analyse de Selection l'économie des ménages BF-PST2-150251-CS-INDV / Recrutement d’un consultant pour la réalisation d’une Individual étude des lieux des structures Capacity building and Under IDA / D3740 Post Consultant Limited 20,000.00 0.00 2020-02-17 2020-06-24 2020-02-22 2020-03-14 2020-04-18 2020-07-17 de réduction des risques des institutional development Implementation Selection catastrophes et crises humanitaires au profit de la DGPC. Page 4 BF-PST2-157001-CS-INDV / Recrutement d'un consultant pour l'étude sur l'automatisation du contrôle- Individual qualité des données et leur Capacity building and Pending IDA / D3740 Post Consultant Limited 24,000.00 0.00 2020-03-10 2020-03-15 2020-04-05 2020-05-10 2020-08-08 acheminement du réseau vers institutional development Implementation Selection le centre d’archivage et la Prévision Numérique du Temps (PNT et HPC) au profit de l'ANAM BF-PST2-157002-CS-INDV / Recrutement d'un consultant pour l'élaboration de la Individual Capacity building and Under stratégie de communication IDA / D3740 Post Consultant Limited 33,000.00 0.00 2020-03-24 2020-06-18 2020-03-29 2020-04-19 2020-05-24 2020-08-22 institutional development Implementation du SAP à l'endroit des Selection communautés au profit du SAP BF-PST2-157003-CS-INDV / Recrutement d'un consultant Individual Capacity building and Pending pour l'étude diagnostique sur IDA / D3740 Post Consultant Limited 28,365.00 0.00 2020-03-24 2020-03-29 2020-04-19 2020-05-24 2020-08-22 institutional development Implementation la modernisation du SAP Selection National BF-PST2-127050-CS-INDV / Recrutement d’un consultant pour la formation des cadres Individual Capacity building and Under du dispositif SAP central et IDA / D3740 Post Consultant Limited 24,000.00 0.00 2020-04-02 2020-03-02 2020-04-07 2020-04-28 2020-06-11 2020-07-01 institutional development Implementation déconcentré en logiciel SIG et Selection télédétection et de 20 agents en SIG au profit de la DGRE BF-PST2-157005-CS-INDV / Recrutement d'un consultant Individual pour la formation des cadres Capacity building and Under IDA / D3740 Post Consultant Limited 9,100.00 0.00 2020-04-30 2020-06-17 2020-05-05 2020-05-26 2020-06-30 2020-08-29 du dispositif SAP central sur institutional development Implementation Selection les modèles de prévision des prix BF-PST2-157006-CS-INDV / Recrutement d'un consultant pour la formation des cadres Individual Capacity building and Under du dispositif SAP central et IDA / D3740 Post Consultant Limited 14,545.00 0.00 2020-06-15 2020-06-17 2020-06-20 2020-07-11 2020-08-15 2020-09-14 institutional development Implementation déconcentré en rédaction des Selection articles et montage de bulletins BF-PST2-157008-CS-INDV / Recrutement d'un consultant pour l'assistance technique informatique en vue de la Individual modernisation de la salle de Capacity building and Under IDA / D3740 Post Consultant Limited 19,100.00 0.00 2020-07-27 2020-06-17 2020-08-01 2020-08-22 2020-09-26 2020-11-25 documentation du SAP et la institutional development Implementation Selection formation des cadres chargés du guichet unique en archivage numérique des données (2 lots) BF-PST2-157009-CS-INDV / Recrutement d'un consultant pour la formation des cadres Individual centraux (formateurs) sur les Capacity building and Under IDA / D3740 Post Consultant Limited 8,182.00 0.00 2020-05-14 2020-06-17 2020-05-19 2020-06-09 2020-07-14 2020-08-13 concepts de sécurité institutional development Implementation Selection alimentaire, la nutrition et l’alerte précoce au profit du SAP BF-PST2-157011-CS-INDV / Recrutement d'un consultant pour l'élaboration d'un guide Enhancement of service Individual Under des risques et des menaces au IDA / D3740 delivery and warnings to Post Consultant Limited 14,545.00 0.00 2020-07-20 2020-06-24 2020-07-25 2020-08-15 2020-09-19 2020-11-18 Implementation profit des élus et des users and communities Selection représentants de l'Etat au profit de la DGPC BF-PST2-157012-CS-INDV / Recrutement d'un consultant pour la mise en place d’une stratégie de communication et Enhancement of service Individual un Protocole Standard Pending IDA / D3740 delivery and warnings to Post Consultant Limited 36,365.00 0.00 2020-04-30 2020-05-05 2020-05-26 2020-06-30 2020-10-28 d’opération (SOP) pour la Implementation users and communities Selection transmission de l’information climatique, en partenariat avec le SAP, la DGPC, le CONASUR et la DGRE au profit de l'ANAM BF-PST2-157013-CS-INDV / Recrutement d'un consultant pour l'appui technique pour l’élaboration et la mise en Enhancement of service Individual place du SOP et de la stratégie Under IDA / D3740 delivery and warnings to Post Consultant Limited 40,000.00 0.00 2020-06-11 2020-09-18 2020-06-16 2020-07-07 2020-08-11 2020-12-09 de communication pour les Implementation users and communities Selection autres partenaires (Energie, Infrastructures, Mines, Transports) au profit de l'ANAM) BF-PST2-157014-CS-INDV / Individual Recrutement d'un consultant Under IDA / D3740 Project Management Post Consultant Limited 9,090.00 0.00 2020-04-16 2020-04-16 2020-04-21 2020-05-12 2020-06-16 2020-08-15 pour la mise en place le site Implementation Selection web du Projet HYDROMET BF-PST2-157015-CS-INDV / Recrutement d'un consultant Individual pour d'un consultant pour Under IDA / D3740 Project Management Post Consultant Limited 16,365.00 0.00 2020-06-18 2020-05-12 2020-06-23 2020-07-14 2020-08-18 2020-12-16 l'établissement de la situation Implementation Selection de référence du Projet HYDROMET BF-PST2-93978-CS-INDV / Individual Etude technique des moyens Capacity building and Under IDA / D3740 Post Consultant Limited 30,000.00 0.00 2020-04-06 2020-06-24 2020-04-11 2020-05-02 2020-06-06 2020-08-05 de communication de la institutional development Implementation Selection Protection civile Page 5 BF-PST2-157016-CS-INDV / Recrutement d'un consultant Individual chargé de l'élaboration d'un Pending IDA / D3740 Project Management Post Consultant Limited 9,090.00 0.00 2020-06-22 2020-06-27 2020-07-18 2020-08-22 2020-11-20 plan de prise en compte du Implementation Selection genre pour le projet HYDROMET. BF-PST2-162324-CS-INDV / Recrutement d'un spécialiste Individual en sauvegarde Under IDA / D3740 Project Management Post Consultant Open 20,750.00 0.00 2020-03-02 2020-03-02 2020-03-26 2020-03-27 2020-04-22 2021-04-17 environnementales et sociales Implementation Selection pour le compte du projet HYDROMET. BF-HYDROMET-167523-CS- Enhancement of service Individual Under INDV / Mise à jour du site web IDA / D3740 delivery and warnings to Post Consultant Limited 7,273.00 0.00 2020-05-20 2020-06-26 2020-05-25 2020-06-15 2020-07-20 2020-09-18 Implementation du SAP/DGESS/MAAH users and communities Selection BF-HYDROMET-225509-CS- Individual INDV / Production d'un film Pending IDA / D3740 Project Management Post Consultant Limited 17,273.00 0.00 2021-08-17 2021-08-22 2021-09-12 2021-10-17 2021-12-16 documentaire sur le projet Implementation Selection HYDROMET BF-HYDROMET-225520-CS- INDV / Formation du dispositif SAP sur le genre et Individual Capacity building and Pending sa prise en compte dans les IDA / D3740 Post Consultant Limited 8,182.00 0.00 2021-07-20 2021-07-25 2021-08-15 2021-09-19 2021-10-19 institutional development Implementation analyses de la sécurité Selection alimentaire et de l’alerte précoce au profit du SAP BF-PST2-126829-CS-INDV / Recrutement d'un consultant individuel pour l'élaboration Individual Pending de huit (08) Notices d'Impacts IDA / D3740 Project Management Post Consultant Limited 58,182.00 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2021-10-14 Implementation Environnemental et social des Selection stations synoptiques de l'ANAM. Page 6 PROCUREMENT PLAN (Textual Part) Project information: FYR of Macedonia Project Implementation agency: Ministry of Labor and Social Policy Date of the Procurement Plan: October 2018 Period covered by this Procurement Plan: Duration of the Project Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT North Macedonia : Social Services Improvement Project PLAN General Information Country: North Macedonia Bank’s Approval Date of the Original Procurement Plan: 2018-10-22 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162246 GPN Date: 2018-09-18 Project Name: Social Services Improvement Project Loan / Credit No: / , IBRD / 89020 M Executing Agency(ies): inistry of Labor and Social Policy WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72220-CW-RFB- 1. Promoting social 134 / Renovation of MLSP, inclusion through improved Single Stage - One 2020-04- SWCs, Municipalities, NEA and / Prior Request for Bids Open - National 0.00 Canceled 2019-08-01 2019-08-31 2019-10-05 2019-10-22 2019-10-30 access to social benefits and Envelope 27 other institutions included in services the SP system MK-MLSP-96745-CW-RFB- 1. Promoting social Pending Request for Single Stage - One 2019-09- 1313 / Renovation of local IBRD / 89020 inclusion through improved Post Open - National 0.00 Implementat 2019-02-06 2019-04-03 Quotations Envelope 30 offices access to social benefits and ion services MK-MLSP-122572-CW-RFB- 2. Expanding the access to TRANSFERS-2.1.1 / Civil Single Stage - One 2021-02- IBRD / 89020 and improving of the quality Prior Request for Bids Open - National 850,675.56 Signed 2019-07-14 2019-08-01 2019-08-13 2019-09-17 2019-10-04 2019-10-07 2019-12-11 2019-10-29 2020-01-03 works-Kindergarten in Envelope 20 of preschool services Kavadarci MK-MLSP-123252-CW-RFB- 2. Expanding the access to TRANSFERS-2.1.1.2 / Civil Single Stage - One 1,071,451.8 2021-02- IBRD / 89020 and improving of the quality Post Request for Bids Open - National Signed 2019-07-19 2019-09-20 2019-08-18 2019-09-22 2019-11-05 2019-10-12 2019-12-10 2019-11-06 2020-01-02 works-Kindergarten in Envelope 7 28 of preschool services Negotino MK-MLSP-123255-CW-RFB- 2. Expanding the access to Single Stage - One 2021-03- TRANSFERS-2.1.1.3 / Civil IBRD / 89020 and improving of the quality Post Request for Bids Open - National 934,707.05 Signed 2019-07-21 2019-10-01 2019-08-20 2019-09-24 2019-11-21 2019-10-14 2019-12-10 2019-11-08 2020-01-03 Envelope 02 works-Kindergarten in Kocani of preschool services MK-MLSP-123257-CW-RFB- 2. Expanding the access to TRANSFERS-2.1.1.4 / Civil Single Stage - One 2019-11- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 698,448.30 Signed 2019-07-25 2019-09-27 2019-08-24 2019-09-28 2019-11-15 2019-10-18 2019-12-09 2019-11-12 2020-01-03 works-Kindergarten in Kisela Envelope 15 of preschool services Voda MK-MLSP-129124-CW-RFQ- 1315 / Renovation of part of 1. Promoting social the Special Institution Demir inclusion through improved Request for Single Stage - One 2019-12- IBRD / 89020 Post Open - National 0.00 Canceled 2019-09-15 2019-10-11 Kapija and part of the Public access to social benefits and Quotations Envelope 20 Institution for rehabilitation of services children and youth MK-MLSP-142028-CW-RFB- 2. Expanding the access to Single Stage - One 2021-06- 2.1.1.5 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 365,321.40 Signed 2019-10-25 2020-07-10 2019-11-14 2019-12-29 2020-08-25 2020-01-18 2020-09-22 2020-03-06 2020-10-20 Envelope 29 Kindergarten in Kriva Palanka of preschool services MK-MLSP-142030-CW-RFB- 2. Expanding the access to Single Stage - One 1,553,358.1 2021-06- 2.1.1.6 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National Signed 2019-10-25 2019-10-31 2019-11-14 2019-12-29 2019-12-17 2020-01-18 2019-12-15 2020-03-06 2020-01-13 Envelope 4 29 Kindergarten in Gjorce Petrov of preschool services MK-MLSP-142033-CW-RFQ- 2. Expanding the access to Request for Single Stage - One 2020-08- 2.1.1.7 / Civil works- IBRD / 89020 and improving of the quality Post Open - National 181,276.15 Signed 2019-11-14 2020-02-11 2019-12-17 Quotations Envelope 09 Kindergarten in Bogovinje of preschool services MK-MLSP-142036-CW-RFB- 2. Expanding the access to Single Stage - One 2021-06- 2.1.1.8 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 404,688.09 Signed 2019-10-25 2019-12-13 2019-11-14 2019-12-29 2019-12-16 2020-01-18 2019-12-13 2020-03-06 2020-01-02 Envelope 29 Kindergarten in Resen of preschool services MK-MLSP-142040-CW-RFB- 2. Expanding the access to Single Stage - One 1,945,032.9 2021-06- 2.1.1.9 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National Signed 2019-10-25 2019-10-29 2019-11-14 2019-12-29 2019-12-13 2020-01-18 2019-12-11 2020-03-06 2020-01-03 Envelope 7 29 Kindergarten in Strumica of preschool services MK-MLSP-151802-CW-RFB- 2. Expanding the access to Pending Single Stage - One 2021-10- 2.1.1.10 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Implementat 2020-02-10 2020-03-01 2020-03-15 2020-03-22 2020-05-09 Envelope 31 Kindergarten in Aracinovo of preschool services ion MK-MLSP-151803-CW-RFB- 2. Expanding the access to Single Stage - One 2021-10- 2.1.1.11 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 358,953.04 Signed 2020-02-10 2020-12-14 2020-03-01 2020-03-15 2021-01-25 2020-03-22 2021-01-29 2020-05-09 2021-03-11 Envelope 31 Kindergarten in Valandovo of preschool services MK-MLSP-151804-CW-RFB- 2. Expanding the access to Pending Single Stage - One 2021-10- 2.1.1.12 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Implementat 2020-02-10 2020-03-01 2020-03-15 2020-03-22 2020-05-09 Envelope 31 Kindergarten in Karposh 2 of preschool services ion MK-MLSP-151805-CW-RFB- 2. Expanding the access to Single Stage - One 2021-10- 2.1.1.13 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 378,560.95 Signed 2020-02-10 2020-09-17 2020-03-01 2020-03-15 2020-10-30 2020-03-22 2020-12-14 2020-05-09 2021-01-29 Envelope 31 Kindergarten in Probistip of preschool services MK-MLSP-167801-CW-RFQ- 1.3.15 / Renovation of part of 1. Promoting social the Special Institution Demir inclusion through improved Request for Single Stage - One 2020-12- IBRD / 89020 Post Open - National 240,879.84 Signed 2020-04-11 2020-06-06 2019-11-01 Kapija and part of the Public access to social benefits and Quotations Envelope 03 Institution for rehabilitation of services children and youth MK-MLSP-178969-CW-RFB- 2. Expanding the access to Pending Single Stage - One 2022-02- 2.1.1.16 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Implementat 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 Envelope 13 Kindergarten in Bitola of preschool services ion MK-MLSP-178973-CW-RFB- 2. Expanding the access to Pending Single Stage - One 2022-02- 2.1.1.17 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Implementat 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 Envelope 13 Kindergarten in Lipkovo of preschool services ion MK-MLSP-178976-CW-RFB- 2. Expanding the access to Pending Single Stage - One 2022-02- 2.1.1.18 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Implementat 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 Envelope 13 Kindergarten in Gostivar of preschool services ion Page 1 MK-MLSP-178979-CW-RFB- 2. Expanding the access to Pending Single Stage - One 2022-02- 2.1.1.19 / Civil works- IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Implementat 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 Envelope 13 Kindergarten in Karposh 2 of preschool services ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72180-GO-RFB- 131 / Development of an 1. Promoting social Under integrated social welfare IS inclusion through improved Single Stage - One / Post Request for Bids Open - International 0.00 Implementati 2019-01-15 2020-12-23 2019-02-14 2020-12-28 2019-03-21 2019-04-07 2019-04-15 2020-04-14 covering both social access to social benefits and Envelope on assistance benefits and services services MK-MLSP-72182-GO-RFB- 1. Promoting social Pending 132 / Hardware equipment inclusion through improved Single Stage - One / Post Request for Bids Open - National 0.00 Implementati 2019-03-01 2019-03-21 2019-04-25 2019-05-05 2019-05-13 2019-11-09 for the MLSP and the social access to social benefits and Envelope on institutions services MK-MLSP-72678-GO-RFB- 2. Expanding the access to Single Stage - One 223 / Training for pre- / and improving of the quality Post Request for Bids Open - National 0.00 Canceled 2019-01-15 2019-02-04 2019-03-11 2019-03-21 2019-03-29 2020-03-28 Envelope primary school program of preschool services MK-MLSP-72679-GO-RFB- 2. Expanding the access to Single Stage - One 224 / In service teacher / and improving of the quality Post Request for Bids Open - National 0.00 Canceled 2019-02-15 2019-03-07 2019-04-11 2019-04-21 2019-04-29 2020-04-28 Envelope training of preschool services MK-MLSP-77087-GO-RFQ- 3. Project Management, Request for Single Stage - One / Post Open - National 26,617.47 Terminated 2019-01-09 2019-02-04 2019-12-10 2019-04-05 3118 / Equipment (4 years ) Monitoring and Evaluation Quotations Envelope MK-MLSP-93096-GO-DIR- 1. Promoting social 1310 / Maintenance and IBRD / 89020 inclusion through improved Prior Direct Selection Direct 0.00 Canceled 2019-01-03 2019-01-08 2019-02-12 2021-01-02 Upgrade of CBMIS access to social benefits and services MK-MLSP-94588-GO-RFQ- 3. Project Management, Request for Single Stage - One 3121 / Camera and Recording IBRD / 89020 Post Open - National 15,750.48 Signed 2019-02-09 2019-03-07 2019-07-22 2019-04-06 Monitoring and Evaluation Quotations Envelope devices MK-MLSP-94585-GO-DIR- 1. Promoting social 1310 / Maintenance and IBRD / 89020 inclusion through improved Prior Direct Selection Direct 358,450.12 Signed 2019-01-21 2019-01-28 2019-01-26 2019-01-30 2019-03-02 2019-02-08 2021-03-01 Upgrade of CBMIS access to social benefits and services MK-MLSP-96729-GO-RFB- 1. Promoting social 1311 / Hardware equipment inclusion through improved Single Stage - One IBRD / 89020 Prior Request for Bids Open - National 192,099.49 Signed 2019-02-01 2019-09-24 2019-03-03 2019-04-07 2019-11-08 2019-04-24 2019-11-21 2019-05-02 2019-12-19 2019-10-29 for the local offices and the access to social benefits and Envelope MLSP services MK-MLSP-96739-GO-RFQ- 1. Promoting social Pending Request for Single Stage - One 1312 / Furniture for the local IBRD / 89020 inclusion through improved Post Open - National 0.00 Implementati 2019-02-10 2019-03-08 2019-09-04 Quotations Envelope offices access to social benefits and on services MK-MLSP-77092-GO-RFQ- 3. Project Management, Request for Single Stage - One / Prior Open - National 0.00 Canceled 2019-02-15 2019-03-18 2019-05-17 326 / Vehicles (2) Monitoring and Evaluation Quotations Envelope MK-MLSP-122570-GO-RFQ- 3. Project Management, Request for Single Stage - One 328 / Procurement of Vehicles IBRD / 89020 Prior Open - National 0.00 Canceled 2019-07-27 2019-09-02 2019-12-01 Monitoring and Evaluation Quotations Envelope (2) MK-MLSP-129121-GO-RFQ- 1. Promoting social Request for Single Stage - One 1314 / Furniture for the IBRD / 89020 inclusion through improved Post Open - National 22,554.84 Signed 2019-09-10 2019-10-24 2019-11-19 2019-12-23 Quotations Envelope Center for Cerebral palsy access to social benefits and services MK-MLSP-129129-GO-DIR- 1. Promoting social 1316 / Upgrade of CBMIS-SSIP IBRD / 89020 inclusion through improved Post Direct Selection Direct 10,079.30 Signed 2019-09-10 2019-10-01 2019-09-15 2019-10-01 2019-09-25 2019-11-25 2020-03-23 Financial module access to social benefits and services MK-MLSP-169710-GO-RFQ- 2.1.1.14 / Furnishing and equipment for the 2. Expanding the access to kindergarten in the Request for Single Stage - One IBRD / 89020 and improving of the quality Post Open - National 97,878.71 Signed 2020-05-06 2020-07-01 2020-08-07 2020-08-30 municipality of Bogovinje Quotations Envelope of preschool services (village of Kamenjane), including outside playground equipment MK-MLSP-173421-GO-RFQ- 2.1.1.15 / Furnishing and equipment for the 2. Expanding the access to Request for Single Stage - One kindergarten in the IBRD / 89020 and improving of the quality Post Open - National 131,723.10 Signed 2020-06-06 2020-08-01 2020-08-04 2020-09-10 Quotations Envelope municipality of Resen , of preschool services including outside playground equipment MK-MLSP-173425-GO-RFQ- 3. Project Management, Request for Single Stage - One IBRD / 89020 Post Open - National 27,217.36 Signed 2020-06-06 2020-08-01 2020-08-07 2020-08-31 3.1.32 / Antivirus licenses Monitoring and Evaluation Quotations Envelope MK-MLSP-173432-GO-RFQ- 3. Project Management, Request for Single Stage - One 3.2.9 / Procurement of IBRD / 89020 Post Open - National 33,581.06 Signed 2020-07-06 2020-08-31 2020-08-24 2020-11-29 Monitoring and Evaluation Quotations Envelope hardware equipment MK-MLSP-178981-GO-RFQ- 2. Expanding the access to 2.2.18 / Printing of age Request for Single Stage - One IBRD / 89020 and improving of the quality Post Open - National 39,639.84 Signed 2020-07-06 2020-08-31 2021-02-15 2020-09-30 appropriate teaching-learning Quotations Envelope of preschool services materials MK-MLSP-196377-GO-DIR- 2. Expanding the access to 2.2.19 / Distribution of age IBRD / 89020 and improving of the quality Post Direct Selection Direct 6,123.38 Signed 2020-09-30 2020-10-06 2020-10-05 2020-10-06 2020-11-09 2020-10-15 2020-12-24 appropriate teaching-learning of preschool services materials Page 2 MK-MLSP-203864-GO-RFB- 2.1.1.1.1 / Furnishing and equipment for the 2. Expanding the access to Single Stage - One kindergarten in the IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Canceled 2020-12-01 2020-12-06 2021-01-17 2021-02-16 2021-03-23 2021-06-21 Envelope municipality of Kavadarci , of preschool services including outside playground equipment MK-MLSP-203865-GO-RFB- 2.1.1.2.1 / Furnishing and equipment for the 2. Expanding the access to Single Stage - One kindergarten in the IBRD / 89020 and improving of the quality Post Request for Bids Open - National 165,589.37 Signed 2020-12-01 2020-12-04 2020-12-06 2021-01-17 2021-01-15 2021-02-16 2021-01-29 2021-03-23 2021-04-21 2021-06-21 Envelope municipality of Negotino , of preschool services including outside playground equipment MK-MLSP-203867-GO-RFQ- 2.1.1.3.1 / Furnishing and equipment for the 2. Expanding the access to Pending Request for Single Stage - One kindergarten in the IBRD / 89020 and improving of the quality Post Open - National 0.00 Implementati 2020-12-06 2021-01-31 2021-05-01 Quotations Envelope municipality of Kocani , of preschool services on including outside playground equipment MK-MLSP-203869-GO-RFQ- 2.1.1.4.1 / Furnishing and equipment for the 2. Expanding the access to Pending Request for Single Stage - One kindergarten in the IBRD / 89020 and improving of the quality Post Open - National 0.00 Implementati 2020-12-06 2021-01-31 2021-05-01 Quotations Envelope municipality of Kisela Voda , of preschool services on including outside playground equipment MK-MLSP-203872-GO-RFQ- 2.1.1.6.1 / Furnishing and equipment for the 2. Expanding the access to Pending Request for Single Stage - One kindergarten in the IBRD / 89020 and improving of the quality Post Open - National 0.00 Implementati 2020-12-06 2021-01-31 2021-05-01 Quotations Envelope municipality of Gjorce Petrov , of preschool services on including outside playground equipment MK-MLSP-226423-GO-RFQ- 2.1.1.2.1.2 / Furnishing and equipment for the kindergarten in the 2. Expanding the access to Pending Request for Single Stage - One municipality of Negotino- IBRD / 89020 and improving of the quality Post Open - National 0.00 Implementati 2021-04-06 2021-06-01 2021-07-01 Quotations Envelope Procurement, delivery and of preschool services on installation of Didactic equipment and Procurement of movable partition panels MK-MLSP-234592-GO-RFQ- 2.1.1.1.1 / Furnishing and equipment for the 2. Expanding the access to Pending Request for Single Stage - One kindergarten in the IBRD / 89020 and improving of the quality Post Open - National 0.00 Implementati 2021-05-21 2021-07-16 2021-09-14 Quotations Envelope municipality of Kavadarci , of preschool services on including outside playground equipment MK-MLSP-240823-GO-RFQ- 2. Expanding the access to Pending 2.2.21 / Distribution of age Request for Single Stage - One IBRD / 89020 and improving of the quality Post Open - National 0.00 Implementati 2021-07-02 2021-08-27 2021-11-25 appropriate teaching-learning Quotations Envelope of preschool services on materials NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72163-CS-CQS- 1. Promoting social Consultant 112 / Technical assistance for / inclusion through improved Post Qualification Open - National 0.00 Canceled 2019-02-15 2019-02-23 2019-03-20 2019-03-27 2019-04-04 2020-04-03 activation of GMI beneficiaries access to social benefits and Selection services MK-MLSP-72166-CS-CQS- 1. Promoting social 122 / Technical assistance for Consultant inclusion through improved Pending legislative changes regarding / Post Qualification Open - National 0.00 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 access to social benefits and Implementation the implementation of Selection services reformed licensing system MK-MLSP-72168-CS-CQS- 1. Promoting social Consultant 123 / Social service needs / inclusion through improved Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 assessment access to social benefits and Selection services MK-MLSP-72170-CS-CQS- 1. Promoting social 124 / Developing system for Consultant inclusion through improved financing of social services / Post Qualification Open - National 0.00 Canceled 2019-05-01 2019-05-09 2019-06-03 2019-06-10 2019-06-18 2020-06-17 access to social benefits and including determination of Selection services cost of services, MK-MLSP-72172-CS-CQS- 127 / Transformation of the large institutional capacities 1. Promoting social into small group homes, living Consultant inclusion through improved with support, / Post Qualification Open - National 0.00 Canceled 2019-01-15 2019-01-23 2019-02-17 2019-02-24 2019-03-04 2020-03-03 access to social benefits and deinstitutionalization through Selection services foster families and other appropriate forms of protection MK-MLSP-72175-CS-CQS- 1. Promoting social 128 / Outreach activities inclusion through improved Quality And Cost- / Prior Open - National 0.00 Canceled 2019-03-01 2019-03-15 2019-04-26 2019-05-01 2019-05-09 2019-05-22 2019-05-30 2020-05-29 includeing Citizen access to social benefits and Based Selection Angegement activities services Page 3 MK-MLSP-72676-CS-CQS- 2. Expanding the access to Consultant 222 / Developing a new / and improving of the quality Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 capitation formula of preschool services Selection MK-MLSP-77086-CS-LCS- 3. Project Management, Least Cost IBRD / 89020 Prior Open - National 28,373.17 Signed 2019-01-01 2020-02-26 2019-01-15 2019-02-26 2020-03-23 2019-03-03 2020-05-05 2019-03-11 2020-06-05 2019-03-24 2020-06-18 2019-04-01 2020-07-10 2024-03-30 3117 / Project Audit Monitoring and Evaluation Selection MK-MLSP-77089-CS-CQS- 321 / Operational and Consultant Performance Audit of the 3. Project Management, / Post Qualification Open - National 78,345.50 Signed 2019-02-01 2020-02-18 2019-02-09 2019-03-06 2020-04-23 2019-03-13 2020-06-03 2019-03-21 2020-06-09 2024-02-17 implementation of the ECDE Monitoring and Evaluation Selection Grant program for infrastructure projects MK-MLSP-77090-CS-CQS- 322 / Operational and Performance Audit for the Consultant implementation of the grant 3. Project Management, / Post Qualification Open - National 78,536.61 Signed 2019-02-01 2020-02-18 2019-02-09 2019-03-06 2020-04-23 2019-03-13 2020-06-03 2019-03-21 2020-06-09 2024-02-17 mechanism that will promote Monitoring and Evaluation Selection development of (non- institutional) social services at local level MK-MLSP-77091-CS-CQS- Consultant 323 / Baseline and Follow up 3. Project Management, / Post Qualification Open - National 188,037.85 Signed 2019-02-01 2019-10-10 2019-02-09 2019-03-06 2019-12-06 2019-03-13 2019-12-25 2019-03-21 2019-12-30 2024-02-17 Institutional Assessment of Monitoring and Evaluation Selection the preschool quality process MK-MLSP-72681-CS-QCBS- 2. Expanding the access to 225 / Developing a system Quality And Cost- IBRD / 89020 and improving of the quality Post Open - International 0.00 Canceled 2019-01-01 2019-01-09 2019-02-15 2019-02-20 2019-02-25 2019-03-07 2019-03-15 2020-03-14 for evaluation of quality in the Based Selection of preschool services preschool education system MK-MLSP-72232-CS-QCBS- 2. Expanding the access to 221 / Developing of age Quality And Cost- Pending IBRD / 89020 and improving of the quality Post Open - International 0.00 2019-04-01 2019-04-09 2019-05-16 2019-05-21 2019-05-26 2019-06-05 2019-06-13 2020-06-12 appropriate teaching-learning Based Selection Implementation of preschool services materials MK-MLSP-72229-CS-QCBS- 2. Expanding the access to Quality And Cost- 212 / Project designs for IBRD / 89020 and improving of the quality Prior Open - International 0.00 Canceled 2019-01-01 2019-01-15 2019-02-26 2019-03-03 2019-03-11 2019-03-24 2019-04-01 2023-12-31 Based Selection kindergartens of preschool services MK-MLSP-72682-CS-QCBS- 226 / Training of ECED administrators and other 2. Expanding the access to Quality And Cost- decision makers to improve IBRD / 89020 and improving of the quality Post Open - International 0.00 Canceled 2019-01-15 2019-01-23 2019-03-01 2019-03-06 2019-03-11 2019-03-21 2019-03-29 2020-03-28 Based Selection capacity and development of of preschool services monitoring programs and tools MK-MLSP-76978-CS-QCBS- 2. Expanding the access to 227 / Outreach activities Quality And Cost- IBRD / 89020 and improving of the quality Post Open - International 0.00 Canceled 2019-01-01 2019-01-09 2019-02-15 2019-02-20 2019-02-25 2019-03-07 2019-03-15 2020-03-14 including Citizen Engagement Based Selection of preschool services activities MK-MLSP-71874-CS-CQS- 1. Promoting social Consultant 111 / Technical assistance for inclusion through improved / Prior Qualification Open - National 0.00 Canceled 2019-01-15 2019-01-29 2019-02-28 2019-03-10 2019-03-18 2020-03-17 legislative changes regarding access to social benefits and Selection the implementation of GMI services MK-MLSP-72164-CS-CQS- 1. Promoting social 121 / Technical assistance for Consultant inclusion through improved legislative changes regarding / Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 access to social benefits and the implementation of social Selection services services reform MK-MLSP-72171-CS-CQS- 125 / Development of quality 1. Promoting social Consultant standards including licensing inclusion through improved / Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 and accreditation and system access to social benefits and Selection for monitoring for their services achievement MK-MLSP-95692-CS-CQS- Consultant 327 / Outreach activities 3. Project Management, IBRD / 89020 Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2021-04-17 including Citizen Engagement Monitoring and Evaluation Selection activities MK-MLSP-98479-CS-CQS- Consultant 327 / Outreach activities 3. Project Management, IBRD / 89020 Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2021-04-17 including Citizen Engagement Monitoring and Evaluation Selection activities MK-MLSP-99426-CS-CQS- 1. Promoting social Consultant 114 / Counselling and inclusion through improved IBRD / 89020 Prior Qualification Open - National 0.00 Canceled 2019-02-07 2019-02-07 2019-02-28 2019-04-13 2019-05-13 2019-06-17 2020-06-16 Motivation for activation of access to social benefits and Selection GMA beneficiaries services MK-MLSP-115906-CS-CQS- 1. Promoting social Consultant 1213 / Social service needs IBRD / 89020 inclusion through improved Post Qualification Open - National 61,155.24 Signed 2019-06-03 2019-06-11 2019-06-11 2019-07-06 2019-07-11 2019-07-13 2019-07-25 2019-07-21 2019-07-25 2020-01-17 assessment access to social benefits and Selection services MK-MLSP-115916-CS-CQS- Consultant 324 / Public campaign 3. Project Management, IBRD / 89020 Post Qualification Open - National 0.00 Canceled 2019-06-03 2019-06-11 2019-07-06 2019-07-13 2019-07-21 2023-12-31 including Citizen Engagement Monitoring and Evaluation Selection activities MK-MLSP-119370-CS-QCBS- 325 / Public campaign 3. Project Management, Quality And Cost- IBRD / 89020 Prior Open - National 415,933.50 Signed 2019-06-17 2019-07-15 2019-07-01 2019-07-16 2019-08-12 2019-11-12 2019-08-17 2019-12-03 2019-08-25 2019-12-06 2019-09-09 2020-02-21 2019-09-22 2020-03-11 2024-06-30 including Citizen Engagement Monitoring and Evaluation Based Selection activities MK-MLSP-122574-CS-CQS- 2121 / Project designs for 2. Expanding the access to Consultant new kindergartens in IBRD / 89020 and improving of the quality Prior Qualification Open - National 93,887.86 Signed 2019-07-15 2019-07-26 2019-07-29 2019-08-23 2020-02-05 2019-09-07 2020-04-07 2019-09-15 2019-11-08 2020-01-13 Arachinovo, Bitola, Lipkovo of preschool services Selection and Valandovo Page 4 MK-MLSP-122578-CS-CQS- 2123 / Revision of basic Project designs for 2. Expanding the access to Consultant kindergartens in Arachinovo, IBRD / 89020 and improving of the quality Post Qualification Open - National 12,335.25 Signed 2019-08-01 2019-08-07 2019-08-15 2019-09-14 2019-12-23 2019-09-24 2020-01-02 2019-10-05 2020-01-08 2020-04-02 Bitola, Lipkovo, Valandovo of preschool services Selection ,Probishtip, Gostivar, Karposh 1 and Karposh 2 MK-MLSP-122576-CS-CQS- 2122 / Project designs for 2. Expanding the access to Consultant upgrades of kindergartens in IBRD / 89020 and improving of the quality Post Qualification Open - National 74,081.25 Signed 2019-07-30 2019-08-01 2019-08-13 2019-09-12 2019-10-10 2019-09-22 2019-10-30 2019-10-06 2019-11-08 2020-01-04 Probishtip, Gostivar, Karposh of preschool services Selection 1 and Karposh 2 MK-MLSP-129132-CS-CQS- 2. Expanding the access to Consultant 213 / Supervision of works for IBRD / 89020 and improving of the quality Post Qualification Open - National 31,454.12 Signed 2019-09-09 2019-09-24 2019-09-17 2019-10-12 2019-12-05 2019-10-19 2019-12-25 2019-10-27 2019-12-30 2021-03-10 construction of kindergartens of preschool services Selection in Negotino and Kavadarci MK-MLSP-129133-CS-CQS- 2. Expanding the access to Consultant 214 / Supervision of works for IBRD / 89020 and improving of the quality Post Qualification Open - National 25,130.45 Signed 2019-09-09 2019-11-12 2019-09-17 2019-10-12 2019-12-06 2019-10-19 2019-12-27 2019-10-27 2019-12-30 2019-12-16 construction of kindergartens of preschool services Selection in Kocani and Kisela Voda MK-MLSP-129135-CS-CQS- 215 / Project for interior 2. Expanding the access to Consultant design for Kindergardens in IBRD / 89020 and improving of the quality Post Qualification Open - National 39,061.04 Signed 2019-09-09 2020-01-24 2019-09-17 2019-10-12 2020-02-25 2019-10-19 2020-03-16 2019-10-27 2020-03-27 2020-01-25 Kocani, Negotino, Kisela Voda, of preschool services Selection Kavadarci and Bogovinje MK-MLSP-129136-CS-CQS- 216 / Project for interior 2. Expanding the access to Consultant design for Kindergartens in IBRD / 89020 and improving of the quality Post Qualification Open - National 41,802.26 Signed 2019-09-09 2020-01-24 2019-09-17 2019-10-12 2020-02-27 2019-10-19 2020-03-16 2019-10-27 2020-03-20 2020-01-25 Gjorce Petrov, Resen, Kriva of preschool services Selection Palanka and Strumica MK-MLSP-135022-CS-CQS- 1214 / Company for 1. Promoting social providing support to the Consultant inclusion through improved municipalities/ potential IBRD / 89020 Post Qualification Open - National 127,667.71 Signed 2019-09-20 2019-09-27 2019-10-04 2019-10-14 2019-12-02 2019-10-17 2019-12-25 2019-10-23 2019-12-30 2023-07-04 access to social benefits and service providers in Selection services preparation of application documents including the project proposals MK-MLSP-146042-CS-CQS- 2.1.7 / Supervision of works for construction of 2. Expanding the access to Consultant kindergartens in the IBRD / 89020 and improving of the quality Post Qualification Open - National 55,893.58 Signed 2019-11-20 2019-11-19 2019-11-28 2019-12-23 2019-12-23 2019-12-30 2019-12-27 2020-02-03 2020-01-02 2021-10-25 municipalities of Strumica, of preschool services Selection Resen, Gjorce Petrov, Bogovinje and Kriva Palanka MK-MLSP-147511-CS-CQS- 2.2.16 / Consultants' firm 2. Expanding the access to Consultant delivering services for IBRD / 89020 and improving of the quality Post Qualification Open - National 99,693.98 Signed 2019-11-29 2019-12-13 2019-12-13 2020-01-01 2019-12-20 2020-01-06 2020-02-21 2020-02-01 2020-02-24 2021-01-31 supporting the process of of preschool services Selection improving the quality of preschool system MK-MLSP-201117-CS-CQS- 2.1.8 / Supervision of works 2. Expanding the access to Consultant for construction of IBRD / 89020 and improving of the quality Post Qualification Open - National 41,315.97 Signed 2020-12-01 2020-10-27 2020-12-22 2021-02-04 2021-02-03 2021-03-06 2021-02-24 2021-04-10 2021-03-08 2023-03-31 kindergartens in Probishtip, of preschool services Selection Lipkovo, Bitola and Valandovo MK-MLSP-201118-CS-CQS- 2.1.9 / Supervision of works 2. Expanding the access to Consultant Under for construction of IBRD / 89020 and improving of the quality Post Qualification Open - National 0.00 2020-12-01 2020-10-27 2020-12-22 2021-02-04 2021-03-06 2021-04-10 2023-03-31 Implementation kindergartens in Gostivar, of preschool services Selection Arachinovo and Karposh MK-MLSP-201119-CS-CQS- 2.1.10 / Project for interior 2. Expanding the access to Consultant design for Kindergartens in IBRD / 89020 and improving of the quality Post Qualification Open - National 24,744.21 Signed 2020-12-01 2020-10-27 2020-12-22 2021-02-04 2021-04-14 2021-03-06 2021-05-18 2021-04-10 2021-05-27 2023-03-31 Lipkovo, Aracinovo and of preschool services Selection Valandovo MK-MLSP-201120-CS-CQS- 2.1.11 / Project for interior 2. Expanding the access to Consultant Under design for Kindergartens in IBRD / 89020 and improving of the quality Post Qualification Open - National 0.00 2020-12-01 2020-10-30 2020-12-22 2021-02-04 2021-03-06 2021-04-10 2023-03-31 Implementation Probishtip, Bitola, Gostivar of preschool services Selection and Karposh INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72221-CS-CDS- 1. Promoting social 135 / Actuary in the Unit for inclusion through improved IBRD / 89020 Prior Direct Selection Direct 79,664.25 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 Analysis, Evaluation and access to social benefits and Monitoring services MK-MLSP-72223-CS-CDS- 1. Promoting social Individual 136 / IT in the Unit for inclusion through improved IBRD / 89020 Prior Consultant Open 65,337.88 Signed 2019-01-01 2018-10-25 2019-01-29 2018-11-23 2019-02-08 2018-11-28 2019-02-16 2018-11-29 2024-02-15 Analysis, Evaluation and access to social benefits and Selection Monitoring services MK-MLSP-72225-CS-CDS- 1. Promoting social 137 / Researcher in the Unit inclusion through improved IBRD / 89020 Prior Direct Selection Direct 75,392.24 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 for Analysis, Evaluation and access to social benefits and Monitoring services MK-MLSP-72228-CS-CDS- 1. Promoting social 139 / Legal Advisor in the inclusion through improved IBRD / 89020 Prior Direct Selection Direct 197,332.13 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 Unit for Analysis, Evaluation access to social benefits and and Monitoring services Page 5 MK-MLSP-76981-CS-INDV- 228 / Capacity building of 2. Expanding the access to Individual local architects and engineers IBRD / 89020 and improving of the quality Post Consultant Open 84,037.50 Signed 2019-03-01 2019-02-04 2019-03-24 2019-03-29 2019-03-31 2019-05-10 2019-04-08 2019-05-10 2019-10-05 for such innovative and highly of preschool services Selection energy-efficient infrastructure MK-MLSP-77005-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 221,782.58 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 311 / Project Manager Monitoring and Evaluation MK-MLSP-77006-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 188,548.95 Signed 2019-01-01 2018-11-12 2019-01-21 2019-02-08 2018-10-02 2024-02-07 312 / Procurement manager Monitoring and Evaluation Individual MK-MLSP-77007-CS-INDV- 3. Project Management, / Prior Consultant Open 0.00 Canceled 2019-01-01 2019-01-29 2019-02-08 2019-02-16 2024-02-13 313 / Coordinator for ECDE Monitoring and Evaluation Selection MK-MLSP-77008-CS-INDV- Individual 3. Project Management, 314 / Coordinator for Social IBRD / 89020 Prior Consultant Open 177,444.70 Signed 2019-01-01 2019-05-15 2019-01-29 2019-05-31 2019-02-08 2019-06-03 2019-02-16 2019-05-31 2024-02-15 Monitoring and Evaluation services development Selection MK-MLSP-77009-CS-INDV- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 175,079.26 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 315 / IT manager Monitoring and Evaluation MK-MLSP-77010-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 175,923.56 Signed 2019-01-01 2018-11-12 2019-01-21 2019-02-08 2018-10-02 2024-02-07 316 / Financial manager Monitoring and Evaluation MK-MLSP-77016-CS-INDV- Individual 3. Project Management, 3111 / Environmental/social IBRD / 89020 Prior Consultant Open 79,853.27 Signed 2019-01-01 2019-01-24 2019-01-29 2019-03-18 2019-02-08 2019-03-26 2019-02-16 2019-03-29 2024-02-15 Monitoring and Evaluation safeguards specialist Selection MK-MLSP-72227-CS-CDS- 1. Promoting social 138 / Social Consultant in the inclusion through improved IBRD / 89020 Prior Direct Selection Direct 117,990.67 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-04 2024-06-30 Unit for Analysis, Evaluation access to social benefits and and Monitoring services MK-MLSP-77011-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 53,314.64 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 317 / Civil engineer/architect Monitoring and Evaluation MK-MLSP-77012-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 67,944.00 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 318 / Civil engineer/architect Monitoring and Evaluation MK-MLSP-77013-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 52,145.31 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 319 / Civil engineer/architect Monitoring and Evaluation MK-MLSP-77014-CS-CDS- 3. Project Management, 3110 / Civil IBRD / 89020 Prior Direct Selection Direct 155,023.10 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 Monitoring and Evaluation engineer/architect MK-MLSP-77022-CS-CDS- Individual 3. Project Management, Pending 3114 / Grant application IBRD / 89020 Post Consultant Open 0.00 2019-01-01 2019-01-29 2019-02-08 2019-02-16 2024-06-30 Monitoring and Evaluation Implementation officer Selection Individual MK-MLSP-77083-CS-INDV- 3. Project Management, IBRD / 89020 Prior Consultant Open 150,188.17 Completed 2019-01-01 2019-11-19 2019-01-24 2019-12-07 2019-01-31 2019-12-10 2019-02-08 2019-12-11 2024-06-30 2019-12-31 3115 / M&E Officer Monitoring and Evaluation Selection MK-MLSP-77018-CS-CDS- 3. Project Management, 31112 / Grant Administrative IBRD / 89020 Prior Direct Selection Direct 178,697.43 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 Monitoring and Evaluation Coordinator MK-MLSP-77020-CS-CDS- 3. Project Management, 3113 / Financial and IBRD / 89020 Prior Direct Selection Direct 88,621.61 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 Monitoring and Evaluation administrative officer Individual MK-MLSP-77085-CS-CDS- 3. Project Management, Under IBRD / 89020 Post Consultant Open 0.00 2019-01-01 2019-02-05 2019-01-29 2019-02-08 2019-02-16 2024-06-30 3116 / IT officer Monitoring and Evaluation Implementation Selection MK-MLSP-94587-CS-INDV- Individual 3. Project Management, 3120 / Environmental/social IBRD / 89020 Post Consultant Open 87,697.46 Signed 2019-03-01 2020-05-20 2019-03-24 2020-06-09 2019-03-31 2020-06-29 2019-04-08 2020-07-01 2024-04-06 Monitoring and Evaluation safeguards assistance Selection Individual MK-MLSP-94589-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 153,586.85 Signed 2019-03-01 2019-02-07 2019-03-24 2019-04-12 2019-03-31 2019-04-15 2019-04-08 2019-04-16 2024-04-06 3122 / Interior Designer Monitoring and Evaluation Selection Individual MK-MLSP-94590-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 29,590.53 Signed 2019-02-01 2019-02-24 2019-03-18 2019-03-03 2019-04-01 2019-03-11 2019-04-05 2024-03-09 3123 / Business Analyst Monitoring and Evaluation Selection MK-MLSP-94593-CS-INDV- 1. Promoting social Individual 113 / Social Safety Net IBRD / 89020 inclusion through improved Post Consultant Open 96,631.92 Signed 2019-02-01 2019-02-04 2019-02-24 2019-03-29 2019-03-03 2019-04-09 2019-03-11 2019-05-15 2024-03-09 Specialist access to social benefits and Selection services MK-MLSP-94594-CS-INDV- 129 / Development of norms 1. Promoting social Individual and standards for inclusion through improved IBRD / 89020 Post Consultant Open 13,459.20 Signed 2019-03-01 2019-02-06 2019-03-24 2019-04-15 2019-03-31 2019-05-20 2019-04-08 2019-05-23 2020-04-07 establishing of social services access to social benefits and Selection and for ensuring quality in the services service delivery MK-MLSP-94596-CS-INDV- 1210 / Support for 1. Promoting social Development of norms and Individual inclusion through improved standards for establishing of IBRD / 89020 Post Consultant Open 8,335.63 Signed 2019-03-01 2019-02-06 2019-03-24 2019-04-15 2019-03-31 2019-05-22 2019-04-08 2019-05-28 2020-04-07 access to social benefits and social services and for Selection services ensuring quality in the service delivery MK-MLSP-94598-CS-INDV- 1. Promoting social Individual 1211 / Developing a system inclusion through improved Pending IBRD / 89020 Post Consultant Open 0.00 2019-03-01 2019-03-24 2019-03-31 2019-04-08 2020-04-07 for evaluation of quality in the access to social benefits and Implementation Selection social services delivery system services Page 6 MK-MLSP-95684-CS-INDV- 1. Promoting social 1212 / Preparation of Cost Individual inclusion through improved Methodology for Establishing IBRD / 89020 Post Consultant Open 22,275.54 Signed 2019-02-01 2019-02-06 2019-02-24 2019-04-17 2019-03-03 2019-05-27 2019-03-11 2019-05-27 2019-09-07 access to social benefits and of Social Services including Selection services pricing list MK-MLSP-95686-CS-INDV- 2. Expanding the access to Individual 229 / Developing a new IBRD / 89020 and improving of the quality Post Consultant Open 7,761.25 Signed 2019-05-01 2019-10-18 2019-05-24 2019-12-04 2019-05-31 2019-12-17 2019-06-08 2019-12-18 2019-12-05 capitation formula of preschool services Selection MK-MLSP-96725-CS-INDV- Individual 3. Project Management, 3124 / Business Analyst IBRD / 89020 Post Consultant Direct 0.00 Canceled 2019-02-01 2019-01-30 2019-02-14 2019-04-01 2019-02-24 2019-04-08 2019-03-04 2024-03-02 Monitoring and Evaluation Assistant Selection MK-MLSP-97638-CS-CDS- 1. Promoting social 114 / Counselling and inclusion through improved IBRD / 89020 Prior Direct Selection Direct 0.00 Canceled 2019-02-01 2019-02-11 2019-04-17 2020-04-16 Motivation for activation of access to social benefits and GMA beneficiaries services MK-MLSP-119013-CS-INDV- Individual 3. Project Management, 3125 / Business Analyst IBRD / 89020 Post Consultant Limited 102,630.85 Signed 2019-06-13 2019-01-30 2019-06-23 2019-04-01 2019-06-30 2019-04-04 2019-07-08 2019-04-11 2020-01-04 Monitoring and Evaluation Assistant Selection Individual MK-MLSP-129139-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 117,305.19 Signed 2019-09-09 2019-12-03 2019-10-02 2019-12-28 2019-10-09 2019-12-30 2019-10-24 2019-12-31 2024-07-29 3126 / Civil engineer Monitoring and Evaluation Selection Individual MK-MLSP-129140-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 76,936.38 Signed 2019-09-09 2020-10-27 2019-10-02 2021-01-08 2019-10-09 2021-01-12 2019-10-24 2021-01-14 2024-07-29 3127 / Civil engineer/arhitect Monitoring and Evaluation Selection Individual MK-MLSP-129143-CS-INDV- 3. Project Management, Pending IBRD / 89020 Post Consultant Open 0.00 2019-09-09 2019-10-02 2019-10-09 2019-10-24 2024-07-29 3128 / Electrical engineer Monitoring and Evaluation Implementation Selection Individual MK-MLSP-129144-CS-INDV- 3. Project Management, Pending IBRD / 89020 Post Consultant Open 0.00 2019-09-09 2019-10-02 2019-10-09 2019-10-24 2024-07-29 3129 / Mechanical engineer Monitoring and Evaluation Implementation Selection MK-MLSP-129624-CS-INDV- 1. Promoting social Individual 1317 / Economist in the Unit inclusion through improved IBRD / 89020 Post Consultant Limited 157,335.13 Signed 2019-08-29 2019-09-13 2019-09-06 2019-09-17 2019-09-11 2019-09-17 2019-10-10 2019-09-18 2024-08-14 for Analysis, Evaluation and access to social benefits and Selection Monitoring services Individual MK-MLSP-129625-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 112,906.32 Signed 2019-09-18 2019-09-19 2019-10-11 2019-10-18 2019-10-26 2019-10-20 2019-11-03 2019-10-21 2020-05-01 3130 / Procurement officer Monitoring and Evaluation Selection 2. Expanding the access to Individual MK-MLSP-135381-CS-INDV- IBRD / 89020 and improving of the quality Post Consultant Open 109,940.00 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-04 2019-10-26 2020-01-20 2019-11-12 2020-01-21 2024-06-18 1.2.10 / Principal Investigator of preschool services Selection MK-MLSP-135385-CS-INDV- 2. Expanding the access to Individual 2211 / Local Support to the IBRD / 89020 and improving of the quality Post Consultant Open 70,345.79 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-11 2019-10-31 2019-12-14 2019-11-22 2019-12-18 2024-06-28 Principal Investigator of preschool services Selection MK-MLSP-135386-CS-INDV- 2. Expanding the access to Individual 2.2.12 / National Coordinator IBRD / 89020 and improving of the quality Post Consultant Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-18 2024-06-14 for Measuring Early Learning of preschool services Selection Environment (MELE) MK-MLSP-135387-CS-INDV- 2.2.13 / National Coordinator 2. Expanding the access to Individual for Measurement of IBRD / 89020 and improving of the quality Post Consultant Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-18 2024-06-14 Development and Early of preschool services Selection Learning (MODEL) MK-MLSP-135389-CS-INDV- 2.2.14 / Local Consultant for 2. Expanding the access to Individual strengthening the preschool IBRD / 89020 and improving of the quality Post Consultant Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-18 2024-06-14 system for pre-service and in- of preschool services Selection service teacher training MK-MLSP-147510-CS-INDV- 2. Expanding the access to Individual 2.2.15 / International Teacher IBRD / 89020 and improving of the quality Post Consultant Open 52,793.46 Signed 2019-11-27 2019-12-10 2019-12-14 2019-12-13 2019-12-19 2020-02-21 2020-01-16 2020-02-24 2024-06-23 Training and Program Design of preschool services Selection Expert Consultant MK-MLSP-173423-CS-INDV- 2. Expanding the access to Individual 2.2.17 / Developing a new IBRD / 89020 and improving of the quality Post Consultant Open 38,250.00 Signed 2020-06-01 2020-08-18 2020-07-20 2021-01-22 2020-08-10 2021-02-18 2020-09-14 2021-03-01 2021-01-12 capitation formula of preschool services Selection Individual MK-MLSP-173424-CS-INDV- 3. Project Management, IBRD / 89020 Prior Consultant Limited 119,029.21 Signed 2020-05-15 2020-05-29 2020-05-20 2020-06-01 2020-06-10 2020-06-15 2020-07-15 2020-06-16 2024-06-30 3.1.31 / System administrator Monitoring and Evaluation Selection MK-MLSP-173426-CS-INDV- Individual 3. Project Management, 3.1.33 / Assistant Civil IBRD / 89020 Prior Consultant Limited 57,131.68 Signed 2020-05-15 2020-05-20 2020-05-20 2020-06-08 2020-06-10 2020-06-26 2020-07-15 2020-07-01 2024-06-30 Monitoring and Evaluation engineer Selection MK-MLSP-201109-CS-INDV- 1. Promoting social Individual 1.3.18 / Researcher/Analyst inclusion through improved Under IBRD / 89020 Post Consultant Open 0.00 2020-11-18 2020-11-09 2021-01-06 2021-01-27 2021-03-03 2024-06-30 in the Unit for Analysis, access to social benefits and Implementation Selection Evaluation and Monitoring services Individual MK-MLSP-201121-CS-INDV- 3. Project Management, Pending IBRD / 89020 Post Consultant Open 0.00 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2024-06-30 3.1.34 / Interior Designer Monitoring and Evaluation Implementation Selection MK-MLSP-201123-CS-INDV- Individual 3. Project Management, 3.1.35 / Civil IBRD / 89020 Prior Consultant Open 76,755.50 Signed 2020-12-01 2020-10-28 2021-01-19 2021-01-08 2021-02-09 2021-01-12 2021-03-16 2021-01-14 2024-06-30 Monitoring and Evaluation engineer/architect Selection MK-MLSP-201124-CS-INDV- Individual 3. Project Management, 3.1.36 / Assistant IBRD / 89020 Prior Consultant Open 61,306.83 Signed 2020-12-01 2020-11-09 2021-01-19 2020-12-29 2021-02-09 2021-01-11 2021-03-16 2021-01-13 2024-06-30 Monitoring and Evaluation Coordinator for ECDE Selection Page 7 MK-MLSP-201125-CS-INDV- Individual 3.1.37 / Assistant 3. Project Management, IBRD / 89020 Prior Consultant Open 76,755.50 Signed 2020-12-01 2020-11-09 2021-01-19 2020-12-22 2021-02-09 2020-12-30 2021-03-16 2020-12-31 2024-06-30 Coordinator for Social services Monitoring and Evaluation Selection development MK-MLSP-201126-CS-INDV- Individual 3. Project Management, 3.1.38 / Civil IBRD / 89020 Prior Consultant Open 75,190.50 Signed 2020-12-01 2020-10-28 2021-01-19 2021-01-11 2021-02-09 2021-01-12 2021-03-16 2021-01-14 2024-06-30 Monitoring and Evaluation engineer/architect Selection MK-MLSP-203846-CS-INDV- 1. Promoting social Individual 1.3.19 / Legal Advisor in the inclusion through improved IBRD / 89020 Prior Consultant Open 79,187.98 Signed 2020-11-18 2020-11-16 2021-01-06 2021-03-08 2021-01-27 2021-04-21 2021-03-03 2021-04-26 2024-06-30 Unit for Analysis, Evaluation access to social benefits and Selection and Monitoring services MK-MLSP-203854-CS-INDV- Individual 3.1.39 / Junior Assistant 3. Project Management, IBRD / 89020 Prior Consultant Open 76,034.50 Signed 2020-11-15 2020-11-16 2021-01-03 2020-12-22 2021-01-24 2020-12-31 2021-02-28 2020-12-31 2024-06-30 Coordinator for Social Services Monitoring and Evaluation Selection Development MK-MLSP-203861-CS-INDV- 1. Promoting social Individual 1.2.15 / Methodology for IBRD / 89020 inclusion through improved Post Consultant Open 218.21 Signed 2020-11-15 2020-11-13 2021-01-03 2020-11-30 2021-01-24 2020-12-03 2021-02-28 2020-12-09 2021-04-29 pricing social services access to social benefits and Selection services MK-MLSP-212355-CS-INDV- 2. Expanding the access to Individual 2.2.20 / Local Consultant for IBRD / 89020 and improving of the quality Post Consultant Open 9,777.87 Signed 2021-01-07 2021-01-22 2021-02-25 2021-02-25 2021-03-18 2021-03-04 2021-04-22 2021-03-09 2022-04-22 Developing a new capitation of preschool services Selection formula Individual MK-MLSP-219384-CS-INDV- 3. Project Management, IBRD / 89020 Prior Consultant Limited 67,558.29 Signed 2021-02-17 2021-02-17 2021-02-22 2021-02-22 2021-03-15 2021-03-02 2021-04-19 2021-03-04 2024-06-30 3.1.40 / IT officer Monitoring and Evaluation Selection MK-MLSP-232018-CS-INDV- 1. Promoting social Individual Pending 1.2.16 / Methodology for IBRD / 89020 inclusion through improved Post Consultant Direct 0.00 2021-05-05 2021-05-15 2021-06-05 2021-07-10 2024-06-30 Implementation Pricing Social Services access to social benefits and Selection services Page 8 Plan de Passation de marchés I. Généralités 1. L'information sur le projet : Pays : Madagascar ; Emprunteur : République de Madagascar ; Nom de projet : Projet Filets Sociaux de Sécurité – Financement Additionnel (P160 544) ; Numéro du Crédit : D1450-MG ; Agence d’exécution du Projet : Unité Programme National de Nutrition Communautaire. 2. Date d’approbation du Plan de passation de marchés par la Banque : - ; Révision : - ; 3. Date de notification du Plan Général de Passation de marchés : - ; 4. Période couverte par le Plan de Passation de marchés : DOUZE (12) mois. II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable : Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le paragraphe 3.1 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) et sur la base de l'évaluation de la capacité de l'agence d’exécution : Seuil de Méthode de Passation de revue à Commentaires marchés priori (USD) Les montants 1 Biens : AOI/AON/UN/ED 2 000 000 estimatifs des marchés prévus 2 Travaux : AOI/AON/ED 10 000 000 sont au-dessous des seuils. Niveau de Services autres que 3 2 000 000 risque : consultants : AOI/AON/UN/ED « SUBSTANTIEL » 2. Pré-qualification (selon les dispositions des paragraphes 6.19 à 6.24 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable. 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 6.52 et 6.53 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Manuels en cours de mise à jour 5. Tout autre arrangement spécial en passation de marchés : Non Applicable. 6. Allotissement de fournitures avec méthodes et calendrier : [Enumérer d’abord les allotissements qui nécessitent la revue préalable de la Banque, ensuite les autres allotissements] 1 2 3 4 5 6 7 8 9 Réf. No Description Contrat Approche/Méthod Revue de la Coût Pré- Préféren Date Commentaire e de sélection Banque (à estimatif qualificati ce prévue s priori / à (USD) on nationale d’ouverture posteriori) Oui / Non Oui / Non des soumission s Lot 1 : N°9 : Impression et Achevée multiplication de bulletins LIMITE 01 A.11 COT Post 12 000,00 NON NON 21-juin-18 Lot 2 : N°10 : en périodiques (02 numéros NATIONAL attente semestrielles) Maquette Acquisition outils de LIMITE Ordre de Service 03 A.11 COT Post 10 000,00 NON NON 13-mai-18 communication (Pagnes) NATIONAL signé Acquisition divers Pas encore LIMITE 04 A.17 équipements et mobiliers COT Post 5 000,00 NON NON 14-févr-19 lancée NATIONAL de bureau A programmer Acquisition de 293,2 SELECTION 1 475 246 Nouvelle activité 05 A.13 ED Post NON NON 12-févr-19 tonnes de Plumpy Sup DIRECTE ,46 PTA 2019 Acheminement vers LIMITE Nouvelle activité 06 A.13 Districts de 293,2 tonnes COT Post 77 644,55 NON NON 19-févr-19 NATIONAL PTA 2019 de Plumpy Sup Confection d’outils pour les sites : impression et LIMITE Nouvelle activité A.6.0 COT Post 11 812,50 NON NON 04-juin-19 livraison d’outils de NATIONAL PTA 2019 gestion : Registres Confection de plaques d'indication des sites et A.11.0 Supports de LIMITE Nouvelle activité COT Post 27 514,03 NON NON 04-juin-19 .1 communication : NATIONAL PTA 2019 Impression plaque, livrets et bulletins périodiques 1 2 3 4 5 6 7 8 9 Réf. No Description Contrat Approche/Méthod Revue de la Coût Pré- Préféren Date Commentaire e de sélection Banque (à estimatif qualificati ce prévue s priori / à (USD) on nationale d’ouverture posteriori) Oui / Non Oui / Non des soumission s Confection de Pagnes et A.11.0 T-shirt, Blouses pour LIMITE 17 578,13 Nouvelle activité .2 COT Post NON NON 04-juin-19 intervenants (Reny NATIONAL PTA 2019 mavitrika, …) Acquisition de matériels informatiques adaptés à l'actualisation du SIG et LIMITE Nouvelle activité A.14 COT Post 13 312,50 NON NON 04-juin-19 du développement du NATIONAL PTA 2019 Géoportail des données en ligne III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans le paragraphe 3 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) : Méthode de sélection Seuil de Commentaires revue à priori (USD) 1. Méthode compétitive (firmes) 1 000 000 Les montants 2. Entente directe (firmes) 1 000 000 estimatifs des 3. Méthode compétitive (Consultant 300 000 contrats prévus individuel) sont au-dessous 4. Entente directe (Consultant 300 000 des seuils. individuel) Niveau de risque : « SUBSTANTIEL » 2. Liste restreinte composée entièrement de consultants nationaux : Selon les dispositions du paragraphe 7.25 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016), la liste restreinte de consultants peut comporter entièrement des consultants nationaux pour les cas suivants : Catégorie de Montant estimatif consultant 1. Firmes Inférieur à USD 300 000 2. Consultants individuels Inférieur à USD 100 000 3. Tout autre arrangement spécial de Sélection de consultants : Non applicable 4. Tâches de consultation avec des méthodes de sélection et calendrier 1 2 3 4 5 6 7 Réf. No Description des missions Approche/Méth Revue de la Coût Date Commentaires ode de Banque (à estimatif prévue de sélection priori / à (USD) soumission posteriori) s des proposition s Consultant en charge de la maintenance Nouvelle activité PTA 01 A.14 ED ED Post 12 000,00 29-avril-19 du système Géoportail 2019 Consultants chargés de saisie des Nouvelle activité PTA 02 A.16 Registres des sites ED ED Post 34 321,33 20-mai-19 2019 Consultant Individuel en charge de Nouvelle activité PTA 03 B.2 l’élaboration de l’ICR INDV ED Post 5 000,00 21-mai-19 2019 IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier 1. Dans cette section, les activités de renforcement de capacité acceptées (quelques articles pourraient être des recommandations de CPAR) sont énumérées avec le calendrier No. Résultats Coût Durée Date de Commentaires escomptés / estimatif estimative début Description de l’activité PROCUREMENT Madagascar : Social Safety Net Project PLAN General Information Country: Madagascar Bank’s Approval Date of the Original Procurement Plan: 2017-03- 22 2021-05- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149323 GPN Date: 21 Project Name: Social Safety Net Project Loan / Credit No: IDA / D1450, IDA / 57080, IDA / D4340 Intervention Funds for Development Executing Agency(ies): WORKS Activity Reference No. Procurement Estimate Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati High SEA/SH Process Prequalification Bidding Documents Contract / Description Component Review Type Method Document d Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Risk Status Evaluation Report as Issued Completion Type Amount (US$) Documents Justification / Invitation Opening / Minutes Recommendation (US$) Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planne d DRA13TRINF17001 / Travaux de construction de Component 1: Building a Request for Single Stage - One 39,648.5 Complete 2017-07- 2017-08- 2017-07- 2017-08- 2017-08- 2017-09- 2017-08- 2017-09- 2017-08- 2017-10- 2017- l' infrastructure N°01 dans IDA / 57080 safety net for the poor in Post Limited 42,419.35 Proposals Envelope 8 d 24 25 25 25 04 04 14 11 28 10 12-06 la région Analanjirofo selected rural areas (Toamasina). DRA13TRINF17002 / Travaux de construction de Component 1: Building a Request for Single Stage - One 35,816.1 Complete 2017-07- 2017-08- 2017-07- 2017-08- 2017-08- 2017-09- 2017-08- 2017-09- 2017-08- 2017-10- 2017- l'infrastructure N°02 dans la IDA / 57080 safety net for the poor in Post Limited 42,419.35 Proposals Envelope 2 d 24 25 25 25 04 04 14 11 28 10 12-06 région Analanjirofo selected rural areas (Toamasina). DRK13MPETR17001 / Component 1: Building a TRAVAUX DE Single Stage - One 37,996.1 Complete 2017-07- 2017-10- 2017-07- 2017-10- 2017-08- 2017-10- 2017-08- 2017-10- 2017-08- 2017-11- 2017- IDA / 57080 safety net for the poor in Post Request for Bids Limited 41,129.03 REHABILITATION DES Envelope 7 d 13 05 20 05 04 20 07 20 21 10 12-19 selected rural areas OUVRAGES VOHITRINDRY ILAKATRA ARA13TRMPE17005 / Component 1: Building a Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- Travaux de construction IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled Envelope 28 31 15 18 05 12-21 infrastructure de base n°05 selected rural areas ARA13TRMPE17006 / Component 1: Building a Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- Travaux de construction IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled Envelope 28 31 15 18 05 12-21 infrastructure de base n°06 selected rural areas ARA13TRMPE17007 / Component 1: Building a Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- Travaux de construction IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled Envelope 28 31 15 18 05 12-21 infrastructure de base n°07 selected rural areas post catastrophe ARA13TRMPE17008 / Component 1: Building a Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- Travaux de construction IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled Envelope 28 31 15 18 05 12-21 infrastructure de base n°08 selected rural areas post catastrophe ARA13TRMPE17009 / Component 1: Building a Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-08- 2018- Travaux de construction IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled Envelope 28 31 15 18 26 12-11 infrastructure de base n°09 selected rural areas post catastrophe ARA13TRMPE17010 / Component 1: Building a Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- Travaux de construction IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled Envelope 28 31 15 18 05 12-21 infrastructure de base n°10 selected rural areas post catastrophe ARA13TRMPE17011 / Component 1: Building a Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- Travaux de construction IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled Envelope 28 31 15 18 05 12-21 infrastructure de base n°11 selected rural areas post catastrophe DRP83TRMPE17007 / Component 1: Building a TRAVAUX DE Request for Single Stage - One 2017-07- 2017-08- 2017-08- 2017-08- 2017-08- 2018- IDA / 57080 safety net for the poor in Post Limited 42,741.94 0.00 Canceled REHABILITATION EPP Proposals Envelope 26 01 16 17 31 12-31 selected rural areas POSTENAWO AMBOVOMBE7 DRP83TRMPE17006 / Component 1: Building a TRAVAUX DE Request for Single Stage - One 2017-07- 2017-08- 2017-08- 2017-08- 2017-08- 2018- IDA / 57080 safety net for the poor in Post Limited 42,741.94 0.00 Canceled REHABILITATION EPP Proposals Envelope 26 01 16 17 31 12-31 selected rural areas POSTENAWO AMBOVOMBE6 DRP83TRMPE17005 / Component 1: Building a TRAVAUX DE Request for Single Stage - One 2017-07- 2017-08- 2017-08- 2017-08- 2017-08- 2018- IDA / 57080 safety net for the poor in Post Limited 42,741.94 0.00 Canceled REHABILITATION EPP Proposals Envelope 26 01 16 17 31 12-31 selected rural areas POSTENAWO AMBOVOMBE5 DRP83TRMPE17003 / Component 1: Building a TRAVAUX DE Request for Single Stage - One 2017-07- 2017-08- 2017-08- 2017-08- 2017-08- 2018- IDA / 57080 safety net for the poor in Post Limited 42,741.94 0.00 Canceled REHABILITATION EPP Proposals Envelope 26 01 16 17 31 12-31 selected rural areas POSTENAWO AMBOVOMBE3 DRP83TRMPE17004 / Component 1: Building a TRAVAUX DE Request for Single Stage - One 2017-07- 2017-08- 2017-08- 2017-08- 2017-08- 2018- IDA / 57080 safety net for the poor in Post Limited 42,741.94 0.00 Canceled REHABILITATION EPP Proposals Envelope 26 01 16 17 31 12-31 selected rural areas POSTENAWO AMBOVOMBE4 DRP83TRMPE17002 / Component 1: Building a TRAVAUX DE Request for Single Stage - One 2017-07- 2017-08- 2017-08- 2017-08- 2017-08- 2018- IDA / 57080 safety net for the poor in Post Limited 42,741.94 0.00 Canceled REHABILITATION EPP Proposals Envelope 26 01 16 17 31 12-31 selected rural areas POSTENAWO AMBOVOMBE2 DRP83TRMPE17001 / Component 1: Building a TRAVAUX DE Request for Single Stage - One 2017-07- 2017-08- 2017-08- 2017-08- 2017-08- 2018- IDA / 57080 safety net for the poor in Post Limited 42,741.94 0.00 Canceled REHABILITATION EPP Proposals Envelope 26 01 16 17 31 12-31 selected rural areas POSTENAWO AMBOVOMBE1 DRP13TRMPE17001 / TRAVAUX DE Component 1: Building a Single Stage - One 61,209.3 Terminate 2017-08- 2017-09- 2017-08- 2017-09- 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2018- RAHABILITATION POST IDA / 57080 safety net for the poor in Post Request for Bids Open - National 85,483.87 Envelope 7 d 23 13 25 24 13 26 16 09 21 10-09 ENAWO EPP AMBOVOMBE selected rural areas CENTRE ET EPP SEVOHIPOTY DRP13TRMPE17002 / Component 1: Building a TRAVAUX DE Single Stage - One 40,164.9 Complete 2017-08- 2017-09- 2017-08- 2017-09- 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 42,741.94 REHABILITATION POST Envelope 5 d 23 13 25 24 13 26 16 09 20 10-09 selected rural areas ENAWO EPP AMPAMATA SUD DRP13TRMPE17003 / TRAVAUX DE Component 1: Building a Single Stage - One 71,667.2 Complete 2017-08- 2017-09- 2017-08- 2017-09- 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2018- REHABILITATION POST IDA / 57080 safety net for the poor in Post Request for Bids Open - National 85,483.87 Envelope 4 d 23 13 25 24 13 26 16 09 27 10-09 ENAWO EPP KOROMA selected rural areas SOALAVA ET EPP AMPAHIJOLOKE DRP13TRMPE17004 / TRAVAUX DE Component 1: Building a Single Stage - One 72,467.4 Complete 2017-08- 2017-09- 2017-08- 2017-09- 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2018- REHABILITATION POST IDA / 57080 safety net for the poor in Post Request for Bids Open - National 85,483.87 Envelope 2 d 23 13 25 24 13 26 31 09 27 10-09 ENAWO EPP LAHIMANARA selected rural areas HAUT ET EPP ANDANGORO ARA13TRMPE17001 / Component 1: Building a Travaux de construction Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled CEG BELAOKA LOKOHO - Envelope 28 31 15 18 05 12-21 selected rural areas BELAOKA LOKOHO - ANDAPA ARA13TRMPE17012 / Component 1: Building a Travaux de Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,216.13 0.00 Canceled construction/réhabilitation Envelope 28 31 15 18 05 12-21 selected rural areas CSB AMBINANIFAHO - AMBINANIFAHO - ANTALAHA ARA13TRMPE17002 / Component 1: Building a Travaux de construction EPP Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Limited 42,164.52 0.00 Canceled AMPAPAMENA I - Envelope 28 31 15 18 05 12-21 selected rural areas ANDRATAMARINA - SAMBAVA DRP83TRMPE17008 / Component 1: Building a Single Stage - One 49,172.1 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-02- 2018- REHAB EPP ANJATOKA IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 7 d 28 14 02 02 14 06 18 20 13 11-20 AMBOVOMBE 1 selected rural areas DRP83TRMPE17009 / Component 1: Building a Single Stage - One 35,265.4 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-02- 2018- REHAB EPP AMPAMOLORA IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 6 d 28 14 02 02 14 06 18 20 13 11-20 AMBOVOMBE 2 selected rural areas DRP83TRMPE17010 / Component 1: Building a Single Stage - One 48,527.1 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-02- 2018- REHAB EPP AMBOASARY I IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 7 d 28 14 02 02 14 06 18 20 13 11-20 AMBOVOMBE 4 selected rural areas DRP83TRMPE17011 / Component 1: Building a Single Stage - One 37,445.9 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-02- 2018- REHAB EPP IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 8 d 28 14 02 02 14 06 18 20 13 11-20 ANKALITSANDRAKE selected rural areas AMBOVOMBE 3 DRP83TRMPE17012 / Component 1: Building a Single Stage - One 41,927.0 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-03- 2018- REHAB EPP ANKILIROE IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 2 d 28 14 02 02 14 06 18 20 13 11-20 AMBOVOMBE 1 selected rural areas DRP83TRMPE17013 / Component 1: Building a Single Stage - One 34,283.6 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-02- 2018- REHAB EPP VOHIBARY IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 3 d 28 14 02 02 14 06 18 21 13 11-21 AMBOASARY I selected rural areas DRP83TRMPE17014 / Component 1: Building a Single Stage - One 35,003.1 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-02- 2018- REHAB EPP BELAY IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 5 d 28 14 02 02 14 06 18 21 13 11-21 AMBOASARY 2 selected rural areas DRP83TRMPE17015 / Component 1: Building a Single Stage - One 41,516.2 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-02- 2018- REHAB EPP SOARAVINA IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 9 d 28 14 02 02 14 06 18 21 12 11-21 LIMBY AMBOASARY 4 selected rural areas DRP83TRMPE17016 / Component 1: Building a Single Stage - One 34,945.4 Complete 2017-09- 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2018-02- 2018- REHAB EPP ANKILIMANARA IDA / D1450 safety net for the poor in Post Request for Bids Open - National 40,967.74 Envelope 0 d 28 14 02 02 14 06 18 21 13 11-21 AMBOASARY 1 selected rural areas DRP13TRMPE18001 / Component 1: Building a TRAVAUX REPRISES EPP Single Stage - One 43,011.2 Complete 2018-05- 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-07- 2019- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 47,602.52 CENTRE ET EPP SEVOHIPOTY Envelope 6 d 04 22 10 11 21 15 21 02 12 07-02 selected rural areas AMBOVOMBE ARA13TRMPE17004 / Component 1: Building a Travaux de reconstruction Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2017- IDA / 57080 safety net for the poor in Post Request for Bids Limited 10,469.16 0.00 Canceled EPP Ankorabe - CR Envelope 28 31 15 18 05 09-05 selected rural areas Ambohimalaza - SAMBAVA ARA13TRMPE17003 / Component 1: Building a Travaux de construction EPP Single Stage - One 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2017- IDA / 57080 safety net for the poor in Post Request for Bids Limited 11,988.04 0.00 Canceled Mahitsiarongana - CR Envelope 28 31 15 18 05 09-05 selected rural areas Ambodivoara - SAMBAVA DRS13TRMPE1801 / Component 1: Building a TRAVAUX DE REPRISE Single Stage - One 85,466.6 2018-04- 2018-02- 2018-04- 2018-05- 2018-02- 2018-05- 2018-03- 2018-06- 2018-04- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 45,245.17 Signed RECONSTRUCTION EPP Envelope 5 25 14 25 25 14 28 19 09 11 09-15 selected rural areas MAHITSIARONGANA - CR AMBODIVOARA - SAMBAVA DRS13TRMPE1802 / Component 1: Building a TRAVAUX DE REPRISE Single Stage - One 2018-04- 2018-04- 2018-05- 2018-05- 2018-06- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 55,325.60 0.00 Canceled RECONSTRUCTION EPP Envelope 25 25 25 28 09 09-15 selected rural areas ANKORABE - CR AMBOHIMALAZA - SAMBAVA DRS13TRMPE1701 / Travaux de reconstruction Component 1: Building a Single Stage - One 56,278.2 2018-01- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2017-01- 2018-03- 2018-02- 2018- CEG BELAOKA LOKOHO - CR IDA / 57080 safety net for the poor in Post Request for Bids Open - National 66,418.96 Signed Envelope 5 10 12 15 14 12 21 11 12 21 07-10 BELAOKA LOKOHO - District selected rural areas ANDAPA - Région SAVA DRS13TRMPE1702 / Travaux de reconstruction Component 1: Building a Single Stage - One 47,979.3 2018-01- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- EPP SARAHANDRANO - CR IDA / 57080 safety net for the poor in Post Request for Bids Open - National 56,624.69 Signed Envelope 5 10 12 15 14 12 21 11 12 21 07-10 AMBODIAMPANA - District selected rural areas SAMBAVA - Région SAVA DRS13TRMPE1703 / Travaux de reconstruction Component 1: Building a Single Stage - One 57,329.1 2018-01- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- EPP AMPAMPAMENA I - CR IDA / 57080 safety net for the poor in Post Request for Bids Open - National 67,659.27 Signed Envelope 9 10 12 15 14 12 21 11 12 21 07-10 ANDRATAMARINA - District selected rural areas SAMBAVA - Région SAVA DRS13TRMPE1704 / Travaux de reconstruction Component 1: Building a École Communautaire Single Stage - One 39,854.1 2018-01- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 47,035.39 Signed ANDALAMAHITSY - CR Envelope 2 10 12 15 14 12 21 11 12 21 07-10 selected rural areas ANTSIRABE NORD - District VOHEMAR - Région SAVA DRS13TRMPE1705 / Travaux de reconstruction Component 1: Building a Single Stage - One 64,386.6 2018-01- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- École Communautaire IDA / 57080 safety net for the poor in Post Request for Bids Open - National 75,988.36 Signed Envelope 1 10 12 15 14 12 21 11 12 21 07-10 NOSIMBARY - CR selected rural areas TSARABARIA - District VOHEMAR - Région SAVA DRS13TRMPE1706 / Travaux de Component 1: Building a réhabilitation/reconstructio Single Stage - One 53,663.4 2017-12- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 63,332.95 Signed n EPP SAHAMAZAVA - CU Envelope 0 04 12 15 14 12 21 11 12 21 07-10 selected rural areas ANDAPA - District ANDAPA - Région SAVA DRS13TRMPE1707 / Travaux de Component 1: Building a réhabilitation/reconstructio Single Stage - One 60,913.3 2017-12- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 71,678.29 Signed n CEG AMPAHANA - CR Envelope 6 04 12 15 14 12 21 11 12 21 07-10 selected rural areas AMPAHANA - District ANTALAHA - Région SAVA DRS13TRMPE1708 / Travaux de réhabilitation Component 1: Building a Single Stage - One 55,306.1 2017-12- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- CEG MAHERIFODY - CU IDA / 57080 safety net for the poor in Post Request for Bids Open - National 65,080.20 Signed Envelope 9 04 12 15 14 12 21 11 12 21 07-10 ANTALAHA - District selected rural areas ANTALAHA - Région SAVA DRS13TRMPE1709 / Travaux de réhabilitation Component 1: Building a Single Stage - One 53,033.1 2017-12- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- EPP AMBATOFISAKA - CU IDA / 57080 safety net for the poor in Post Request for Bids Open - National 62,405.47 Signed Envelope 6 04 12 15 14 12 21 11 12 21 07-10 ANTALAHA - District selected rural areas ANTALAHA - Région SAVA DRS13TRMPE1710 / Travaux de Component 1: Building a réhabilitation/reconstructio Single Stage - One 47,965.5 2017-12- 2017-12- 2018-01- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-02- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 56,442.27 Signed n CSB AMBINANIFAHO - CR Envelope 5 04 12 15 14 12 21 11 12 21 07-10 selected rural areas AMBINANIFAHO - District ANTALAHA - Région SAVA DRK13MPETR18001 / Component 1: Building a TRAVAUX DE Single Stage - One 40,290.1 2018-06- 2018-08- 2018-06- 2018-06- 2018-06- 2018-08- 2018-06- 2018-09- 2018-07- 2018-09- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Limited 43,593.75 Signed RÉHABILITATION/RECONSTR Envelope 6 05 16 12 28 27 27 30 11 14 11 10-12 selected rural areas UCTION ECOLE 1 VOHIPENO DRF13TRMPE18001 / Component 1: Building a TRAVAUX DE Single Stage - One 40,576.6 Complete 2018-07- 2018-08- 2018-08- 2018-08- 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-09- 2018- IDA / 57080 safety net for the poor in Post Request for Bids Limited 45,125.00 RECONSTRUCTION EPP Envelope 5 d 31 23 07 23 22 04 25 04 08 24 12-07 selected rural areas AMBOHIMAHASOA 01 DRF13TRMPE18002 / TRAVAUX DE Component 1: Building a Single Stage - One 34,770.7 Complete 2018-07- 2018-08- 2018-08- 2018-08- 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-09- 2018- RECONSTRUCTION D'UNE IDA / 57080 safety net for the poor in Post Request for Bids Limited 45,125.00 Envelope 6 d 31 23 07 23 22 03 25 04 08 21 12-07 ECOLE PRIMAIRE selected rural areas AMBOHIMAHASOA 02 DRT13TRMPE18001 / Travaux de Component 1: Building a Single Stage - One 40,789.9 Complete 2018-07- 2018-09- 2018-07- 2018-09- 2018-08- 2018-11- 2018-08- 2018-11- 2018-08- 2018-12- 2019- réhabilitation/reconstructio IDA / 57080 safety net for the poor in Post Request for Bids Limited 47,419.35 Envelope 4 d 24 20 26 27 10 09 18 12 30 05 12-13 n d'une école dans le selected rural areas District d'Arivonimamo DRT13TRMPE18002 / Travaux de Component 1: Building a Single Stage - One 45,102.6 Complete 2018-07- 2018-09- 2018-07- 2018-09- 2018-08- 2018-11- 2018-08- 2018-11- 2018-08- 2018-12- 2019- réhabilitation/reconstructio IDA / 57080 safety net for the poor in Post Request for Bids Limited 47,419.35 Envelope 4 d 24 20 26 27 10 09 18 12 30 05 12-13 n d'une école dans le selected rural areas District de Faratsiho DRF13TRMPE19001 / TRAVAUX DE Component 1: Building a Under Single Stage - One 28,611.0 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-07- 2019-07- 2019-07- 2019- RECONSTRUCTION D'UNE IDA / 57080 safety net for the poor in Post Request for Bids Limited 29,750.00 Implemen Envelope 0 16 24 23 27 08 12 11 22 25 25 09-23 EPP DANS LE FOKONTANY selected rural areas tation ANKAZOTANA DRA13TVX2001 / Travaux de curage mécanisé de lit de Component 1: Building a Request for Single Stage - One 2020-01- 2020-01- 2020-01- 2020-01- 2020- rivière en amont du IDA / D4340 safety net for the poor in Post Limited 4,500.00 4,019.45 Signed Quotations Envelope 29 28 30 30 02-05 périmètre à Amparafaravola selected rural areas et Ambatondrazaka DRA11 DC TRV 20002 / Travaux de restauration des Component 1: Building a Under stèles et des panneaux Request for Single Stage - One 2020-09- 2020-11- 2020-11- 2021- IDA / D4340 safety net for the poor in Post Limited 8,500.00 6,369.81 Implemen d'affichage TMDH et FSP Quotations Envelope 20 02 15 05-14 selected rural areas tation dans les districts de Mahanoro - Vatomandry Et Toamasina II DRP82_DC_TRV2001 / Travaux de construction des Component 1: Building a Pending 103 espaces physiques DPEI Request for Single Stage - One 2020-10- 2020-12- 2021- IDA / D4340 safety net for the poor in Post Limited 30,000.00 0.00 Implemen dans les districts Amboasary Quotations Envelope 20 15 06-13 selected rural areas tation sud, Ambovombe Androy, Tsihombe, Bekily et Beloha DRF 12_DC_TRV_ESP_ 2001 / Travaux de construction Component 1: Building a Pending Request for Single Stage - One 2020-11- 2020-12- 2021- de 47 espaces physiques IDA / D4340 safety net for the poor in Post Limited 6,500.00 0.00 Implemen Quotations Envelope 08 26 02-24 TMDH dans le district selected rural areas tation d'Ambohimahasoa DG20_DC_TRAVAUX_RECON S_2001 / Travaux de reconstruction et fourniture Component 1: Building a d'équipements et mobiliers Request for Single Stage - One 870,000.0 487,927. 2020-11- 2020-11- 2020-12- 2021-02- 2021- IDA / D4340 safety net for the poor in Post Limited Signed des infrastructures Socio- Quotations Envelope 0 66 12 11 24 26 03-24 selected rural areas économiques de base dans la région BOeny répartis en dix (10) lots Page 1 DG20_DC_TRAVAUX_REHAB _2002 / Travaux de réhabilitation et fourniture Component 1: Building a Under d'équipements et mobiliers Request for Single Stage - One 160,000.0 242,212. 2020-11- 2020-11- 2020-12- 2021- IDA / D4340 safety net for the poor in Post Limited Implemen des infrastructures Socio- Quotations Envelope 0 49 12 11 24 03-24 selected rural areas tation économiques de base dans la région Boeny répartis en deux (02) lots DRT13 DC TRAVAUXMPE 21001 / Travaux de réhabilitation et de Component 1: Building a Pending reconstruction des Request for Single Stage - One 195,000.0 2021-02- 2021-03- 2021- IDA / D4340 safety net for the poor in Post Limited 0.00 Implemen infrastructures Quotations Envelope 0 02 31 09-27 selected rural areas tation communautaires de base dans les Régions d'Analamanga et de Menabe - 05 Lots DG_AON_TRAVAUX_RECONS _2101 / Travaux de reconstruction et fourniture d'équipements et mobiliers Component 1: Building a Under Single Stage - One 350,000.0 2021-01- 2021-02- 2021-01- 2021-03- 2021-03- 2021-04- 2021- des infrastructures Socio- IDA / D4340 safety net for the poor in Post Request for Bids Open - National 0.00 Implemen Envelope 0 25 09 30 01 31 28 07-27 économiques de base dans selected rural areas tation la région B0eny répartis en quatre (04) lots, Région Boeny, District de Soalala DRA_21001_DC_TRAV_MPE / Travaux de reconstruction Component 1: Building a Pending des infrastructures socio- Request for Single Stage - One 100,000.0 2021-04- 2021-05- 2021- IDA / D4340 safety net for the poor in Post Open - National 0.00 Implemen économiques de base avec Quotations Envelope 0 05 22 08-20 selected rural areas tation fourniture des mobiliers - Région d'Alaotra Mangoro DRK_21002_DC_ESP PHYSIQUE / Mise en place Component 1: Building a Request for Pending de trente (30) Espaces Request for Single Stage - One 2021-06- 2021-08- 2021- IDA / D4340 safety net for the poor in Post Open - National Quotations (Non 1,700.00 0.00 Implemen Physiques pour les sites Quotations Envelope 19 14 11-12 selected rural areas Bank-SPD) tation témoins TMDH répartis en trois lots de Tâcherons. GOODS Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual MG-FID-9596-GO-UN / Component 2: DGPO127849-1-2 Strengthening safety net UN Agencies 2017-01- 2017-03- 2017-02- 2017-03- 2017-03- 2017-03- 2017-03- IDA / D1450 Prior Direct 203,654.39 211,043.69 Signed ACQUISITION 6 VEHICULES administration, monitoring (Direct) 29 23 12 24 03 03 03 PICK UP 4X4 and social accountability DG11FRMAC17001 / Component 1: Building a Marchés multiples divers Request for Single Stage - One 2017-05- 2017-11- 2017-05- 2017-12- 2017-06- 2018-01- IDA / 57080 safety net for the poor in Post Limited 5,143.58 643.46 Completed divers travaux d'impression Quotations Envelope 06 20 29 11 19 09 selected rural areas pour mesures d'accompagnement DG11FRMAC17002 / Marchés multiples divers Component 1: Building a Request for Single Stage - One 2017-05- 2017-05- 2017-05- 2017-07- 2017-06- 2017-08- outils pour mesures IDA / 57080 safety net for the poor in Post Limited 20,391.54 3,661.76 Completed Quotations Envelope 06 30 29 03 19 21 d'accompagnement ACTP selected rural areas (pins, pochette à épargne...) DG20FRINFO17003 / Component 1: Building a Request for Single Stage - One 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-07- Marchés multiples achats IDA / 57080 safety net for the poor in Post Limited 39,275.35 29,954.89 Completed Quotations Envelope 06 12 29 20 19 13 matériels informatiques selected rural areas DG11FRCPS17004 / Component 1: Building a Request for Single Stage - One 2017-05- 2017-09- 2017-06- 2017-10- 2017-07- Marchés multiples (Outils de IDA / 57080 safety net for the poor in Post Limited 16,212.53 12,826.60 Signed Quotations Envelope 16 12 09 13 09 travail et d'identification des selected rural areas CPS) DG20FRCOMM1801 / Component 2: Fournitures d'outils de Strengthening safety net Request for Single Stage - One 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- communication - travaux IDA / 57080 Post Limited 2,250.00 1,311.87 Signed administration, monitoring Quotations Envelope 07 15 26 13 25 d'impression (autocollant, and social accountability pochette porte documents....) DG20FRCOMM1802 / Component 2: FOURNITURES D'OUTILS DE Strengthening safety net Request for Single Stage - One 2018-03- 2017-11- 2018-04- 2017-12- 2018-05- IDA / 57080 Post Limited 850.00 4,330.86 Signed COMMUNICATION - administration, monitoring Quotations Envelope 22 22 30 07 30 GOODIES and social accountability DG20FRCOMM1803 / Component 2: FOURNITURES D'OUTILS DE Strengthening safety net Request for Single Stage - One 2018-03- 2018-03- 2018-03- 2018-04- 2018-04- IDA / 57080 Post Limited 3,250.00 1,408.07 Signed COMMUNICATION (tee shirt, administration, monitoring Quotations Envelope 08 21 31 12 30 casquette, gilet...) and social accountability Component 2: DG20FRCONSINFO1804 / Strengthening safety net Request for Single Stage - One 2018-05- 2018-06- 2018-06- 2018-09- 2018-07- 2018-10- Achat consommables IDA / 57080 Post Limited 5,800.00 5,916.55 Completed administration, monitoring Quotations Envelope 08 14 02 11 02 19 informatiques and social accountability Component 2: DG20FRANTVIR1805 / Strengthening safety net Request for Single Stage - One 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- IDA / 57080 Post Limited 15,200.00 3,060.99 Completed Achat antivirus administration, monitoring Quotations Envelope 08 26 06 25 11 and social accountability DG12FREVEILPE1806 / Component 1: Building a Request for Single Stage - One 2018-05- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- Achat fournitures de IDA / 57080 safety net for the poor in Post Limited 19,300.00 18,319.60 Completed Quotations Envelope 11 13 07 16 07 24 stimulation et éveil petite selected rural areas enfance Component 1: Building a DG12FRJOUEPE1807 / Single Stage - One 2018-05- 2018-06- 2018-05- 2018-06- 2018-07- 2018-06- 2018-09- 2018-06- 2018-09- 2018-07- 2018-12- IDA / 57080 safety net for the poor in Post Request for Bids Open - National 38,600.00 44,974.99 Completed Achat jouets petite enfance Envelope 10 18 11 10 23 17 03 27 21 27 13 selected rural areas Component 1: Building a DG12FRAFFTMDH1808 / Request for Single Stage - One 2018-06- 2018-04- 2018-06- 2018-06- 2018-07- 2018-06- IDA / 57080 safety net for the poor in Post Limited 8,190.00 3,286.23 Completed IMPRESSION AFFICHES TMDH Quotations Envelope 07 19 19 20 10 22 selected rural areas DG11FRBANDMAC1809 / Component 1: Building a CONFECTION BANDEROLES Request for Single Stage - One 2018-06- 2018-08- 2018-07- 2018-09- 2018-08- IDA / 57080 safety net for the poor in Post Limited 27,176.00 21,167.67 Signed EN BACHE POUR MESURE Quotations Envelope 12 10 02 05 01 selected rural areas D'ACCOMPAGNEMENT TMDH DG12FRRADCART1820 / Component 1: Building a Request for Single Stage - One 2018-08- 2018-08- 2018-09- 2018-11- 2018-10- 2018-12- Achat radios carte et carte IDA / 57080 safety net for the poor in Post Limited 13,500.00 11,611.58 Signed Quotations Envelope 11 16 03 20 03 07 SD DPEI selected rural areas DG12FRDEPLMAC1822 / Component 1: Building a Request for Single Stage - One 2018-08- 2018-07- 2018-09- 2018-08- 2018-10- Fourniture de Dépliants IDA / 57080 safety net for the poor in Post Limited 1,340.00 542.16 Signed Quotations Envelope 11 06 03 28 03 MACC TMDH selected rural areas DG12FRJOUDPEI1823 / Component 1: Building a Single Stage - One 2018-08- 2018-06- 2018-08- 2018-09- 2018-07- 2018-09- 2018-09- 2018-09- 2018-09- 2018-10- 2018-11- Achat jouets pour le DPEI IDA / 57080 safety net for the poor in Post Request for Bids Open - National 24,000.00 28,442.41 Completed Envelope 10 21 14 13 23 18 03 25 21 25 12 LOT1 selected rural areas DG12FRJOUDPEI1824 / Component 1: Building a Single Stage - One 2018-08- 2018-06- 2018-08- 2018-09- 2018-07- 2018-09- 2018-09- 2018-09- 2018-09- 2018-10- 2018-10- Achat jouets pour le DPEI IDA / 57080 safety net for the poor in Post Request for Bids Open - National 14,800.00 15,842.59 Completed Envelope 10 21 14 13 23 18 03 25 13 25 29 LOT 2 selected rural areas DG12FRDPEI1825 / Achat Component 1: Building a fournitures pour atelier de Request for Single Stage - One 2018-08- 2018-08- 2018-09- 2018-11- 2018-10- 2018-11- IDA / 57080 safety net for the poor in Post Limited 8,130.00 4,782.55 Completed créativité pour les parents Quotations Envelope 13 14 04 13 04 15 selected rural areas DPEI Component 2: DG20FRCALEND1827 / Strengthening safety net Request for Single Stage - One 2018-11- 2018-11- 2018-12- 2019-01- 2019-01- Fourniture de calendriers et IDA / 57080 Post Limited 19,600.00 31,104.66 Signed administration, monitoring Quotations Envelope 22 22 13 07 03 agendas 2019 and social accountability Component 2: DG20FRMATINFO1901 / Strengthening safety net Request for Single Stage - One 2019-08- 2019-08- 2019-09- 2019-10- 2019-09- 2019-11- ACHATS DES MATÉRIELS IDA / D1450 Post Limited 65,000.00 31,819.93 Completed administration, monitoring Quotations Envelope 12 29 09 21 24 06 INFORMATIQUES and social accountability Component 2: DG20FRCALEND1902 / Strengthening safety net Request for Single Stage - One 2019-08- 2019-09- 2019-09- 2019-10- 2019-09- ÉDITION DES CALENDRIERS IDA / 57080 Post Limited 50,000.00 9,544.50 Signed administration, monitoring Quotations Envelope 11 04 05 21 27 ET AGENDA FID 2020 and social accountability Component 2: DG20FRSENS19002 / Strengthening safety net Request for Single Stage - One 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- BACHE DE SENSIBILISATION IDA / 57080 Post Limited 95,000.00 35,780.64 Signed administration, monitoring Quotations Envelope 30 27 25 21 10 8 THEMES SES ET EF and social accountability DG20FRSUPPSENSMACC190 Component 1: Building a 1 / Marchés multiples: Request for Single Stage - One 2019-08- 2019-09- 2019-09- 2019-10- 2019-09- IDA / D1450 safety net for the poor in Post Limited 150,000.00 119,191.21 Signed Confection des supports de Quotations Envelope 16 19 10 21 20 selected rural areas sensibilisation Component 2: DGFRNVEH190901 / Strengthening safety net UN Agencies 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2019-10- 2020-01- Acquisition de huit IDA / D1450 Post Direct 350,000.00 319,913.76 Signed administration, monitoring (Direct) 20 25 25 25 30 15 28 véhicules de supervisions and social accountability DG20AONINFO_BUR_TECH2 0001 / Acquisition de Component 1: Building a Single Stage - One 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-05- 2020-04- 2020-08- 2020-06- matériels et équipements IDA / D1450 safety net for the poor in Post Request for Bids Open - National 150,000.00 135,472.01 Signed Envelope 06 08 11 22 09 23 12 27 03 26 (Informatiques, selected rural areas Bureautiques, Techniques) DG20DCREGINS_TUL / Component 1: Building a Under Request for Single Stage - One 2019-12- 2020-01- 2020-01- 2020-02- Confection registre IDA / 57080 safety net for the poor in Post Limited 600.00 0.00 Implement Quotations Envelope 10 23 02 01 d'inscription pour Toliary II selected rural areas ation DG20AONRADIOS20001 / Component 1: Building a Single Stage - One 2020-01- 2020-05- 2020-01- 2020-02- 2020-06- 2020-03- 2020-09- 2020-05- 2020-10- 2020-07- Acquisition de radios et IDA / D4340 safety net for the poor in Post Request for Bids Open - National 43,000.00 37,898.34 Signed Envelope 13 15 18 29 16 30 02 04 19 03 accessoires selected rural areas Component 2: DG20UNOPSVEHIC19001 / Strengthening safety net UN Agencies 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-04- Acquisition de neuf (09) IDA / D4340 Post Direct 428,000.00 350,899.22 Signed administration, monitoring (Direct) 12 05 17 05 21 11 20 véhicules de supervision and social accountability DG20AONJOUETS20001 / Component 1: Building a Acquisition de jouets (toutes Single Stage - One 2020-02- 2020-05- 2020-02- 2020-03- 2020-06- 2020-04- 2020-09- 2020-06- 2020-10- 2020-08- IDA / D4340 safety net for the poor in Post Request for Bids Open - National 300,000.00 111,100.42 Signed directions et toutes Envelope 10 04 15 28 12 27 04 01 20 30 selected rural areas composantes) DG20FRLIVREDUCATIFS1902 Component 1: Building a Request for Single Stage - One 2020-01- 2020-09- 2020-03- 2020-11- 2020-05- / ACHAT DE LIVRES IDA / D4340 safety net for the poor in Post Limited 39,000.00 40,662.41 Signed Quotations Envelope 17 17 13 20 12 EDUCATIFS selected rural areas DG20FRQUINC1903 / Component 1: Building a Request for Single Stage - One 2020-01- 2020-04- 2020-03- 2020-10- 2020-05- ACHAT DE DIVERSES IDA / D4340 safety net for the poor in Post Limited 23,000.00 10,484.56 Signed Quotations Envelope 15 17 13 21 12 QUINCAILLERIES selected rural areas Component 2: DG20FRMMB1904 / ACHAT Strengthening safety net Request for Single Stage - One 2020-01- 2020-08- 2020-03- 2020-11- 2020-05- IDA / D4340 Post Limited 10,000.00 5,379.33 Signed DE MOBILIERS DE BUREAU administration, monitoring Quotations Envelope 13 28 09 02 08 and social accountability Component 1: Building a DG20FRBADGES1905 / Request for Single Stage - One 2020-01- 2020-04- 2020-03- 2020-07- 2020-03- IDA / D4340 safety net for the poor in Post Limited 10,000.00 5,852.04 Signed IMPRESSION BADGES Quotations Envelope 18 27 14 06 20 selected rural areas DG20FRCONFECPANN1906 Component 2: Pending / CONFECTION DE Strengthening safety net Request for Single Stage - One 2020-01- 2020-03- 2020-05- IDA / D4340 Post Limited 9,000.00 0.00 Implement PANNEAUX D'AFFICHAGE ET administration, monitoring Quotations Envelope 20 16 15 ation MALLES and social accountability DG20AOCOMBACHES22000 1 / Confections de supports Component 1: Building a de communication en Single Stage - One 2020-01- 2020-02- 2020-03- 2020-04- 2020-05- 2020-12- IDA / D4340 safety net for the poor in Post Request for Bids Open - National 350,000.00 0.00 Canceled bâches - Marchés multiples Envelope 27 01 14 13 18 31 selected rural areas pour toutes composantes et toutes Directions DG20AOCOMMTISSUS20001 / Confection de supports de Component 1: Building a communication en tissus - Single Stage - One 2020-02- 2020-03- 2020-02- 2020-03- 2020-04- 2020-04- 2020-06- 2020-06- 2020-08- 2020-12- IDA / D4340 safety net for the poor in Post Request for Bids Open - National 126,000.00 64,270.45 Signed Marchés multiples pour Envelope 10 17 15 28 28 27 22 01 19 31 selected rural areas toutes composantes et toutes directions. Component 1: Building a Pending DG20FRKITVSLA1907 / Request for Single Stage - One 2020-01- 2020-03- 2020-05- IDA / D4340 safety net for the poor in Post Limited 5,000.00 0.00 Implement ACHAT KIT VSLA Quotations Envelope 22 18 17 selected rural areas ation DG20AOBOITESAIMAGES200 Component 1: Building a Single Stage - One 2020-01- 2020-02- 2020-03- 2020-04- 2020-05- 2020-12- 01 / Confection boîtes à IDA / D4340 safety net for the poor in Post Request for Bids Open - National 145,000.00 0.00 Canceled Envelope 27 01 14 13 18 31 images selected rural areas DG20FRNTBURDIRAVEC190 Component 1: Building a Pending Request for Single Stage - One 2020-01- 2020-03- 2020-05- 8 / ACHAT FOURNITURE DE IDA / D4340 safety net for the poor in Post Limited 30,000.00 0.00 Implement Quotations Envelope 29 25 24 BUREAU (AVEC) POUR LES selected rural areas ation DIRs DG20AOIMPRESSIONSUPPOR Component 1: Building a Pending T20001 / Impression et Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-05- 2020-12- IDA / D4340 safety net for the poor in Post Request for Bids Open - National 130,000.00 0.00 Implement multiplication de divers Envelope 13 18 29 30 04 31 selected rural areas ation outils de travail - Toutes Directions DG20DCCOMMPAPIERS2000 1 / Confection de supports Component 1: Building a de communications en Request for Single Stage - One 2020-02- 2020-04- 2020-04- 2020-06- 2020-12- IDA / D4340 safety net for the poor in Post Limited 35,000.00 26,127.65 Signed papier : Affiches, Dépliants, Quotations Envelope 08 17 04 30 31 selected rural areas ... - Marchés multiples pour toutes Directions DG20FRCOFFCADENAS1909 Component 1: Building a / CONFECTION COFFRETS Request for Single Stage - One 2020-01- 2020-04- 2020-03- 2020-07- 2020-05- IDA / D4340 safety net for the poor in Post Limited 35,200.00 8.72 Signed AVEC CADENAS(AVEC Quotations Envelope 15 02 11 06 10 selected rural areas Inclusion Financière) pour les DIR DG20FRCUVETAVEC1910 / Component 1: Building a Under ACHAT DE CUVETTES (AVEC Request for Single Stage - One 2020-01- 2020-03- 2020-05- IDA / D4340 safety net for the poor in Post Limited 10,000.00 0.00 Implement Inclusion Financière) pour Quotations Envelope 18 14 13 selected rural areas ation les DIRs DG20FRSACFICEL1911 / Component 1: Building a CONFECTION SAC A FICELLE Request for Single Stage - One 2020-01- 2020-04- 2020-03- 2020-07- 2020-05- IDA / D4340 safety net for the poor in Post Limited 10,000.00 52,185.87 Signed (Inclusion Financière) pour Quotations Envelope 25 17 21 06 20 selected rural areas les DIRs DG20DC_2010_CLEARBAG Component 1: Building a Under Request for Single Stage - One 2020-04- 2020-04- 2020-05- 2020-06- / Acquisition de pochettes IDA / D4340 safety net for the poor in Post Limited 40,000.00 0.00 Implement Quotations Envelope 01 21 27 17 plastiques (Clearbag) selected rural areas ation DG20DC_2013_IMPRESSION Component 1: Building a Pending _OUTILS / Impression et Request for Single Stage - One 2020-03- 2020-04- 2020-05- IDA / 57080 safety net for the poor in Post Limited 10,000.00 0.00 Implement multiplication d'outils de Quotations Envelope 30 28 28 selected rural areas ation travail (AVEC) DG20DC_2012_BACHES / Component 1: Building a Request for Single Stage - One 2020-04- 2020-04- 2020-05- 2020-06- 2020-07- Fourniture de supports de IDA / D4340 safety net for the poor in Post Limited 50,000.00 45,300.32 Signed Quotations Envelope 01 27 27 30 26 sensibilisation en bâches selected rural areas DG20DC_2011_BOITESAIMA Component 1: Building a Request for Single Stage - One 2020-03- 2020-06- 2020-05- 2020-10- 2020-07- GES / Fourniture de boites à IDA / D4340 safety net for the poor in Post Limited 60,000.00 31,428.70 Signed Quotations Envelope 28 03 23 06 22 images selected rural areas Component 2: DRU12CFMOB20001 / Strengthening safety net Request for Single Stage - One 2020-06- 2020-07- 2020-08- 2020-07- 2020-10- 2021-02- ACQUISITION DE MOBILIERS IDA / D4340 Post Limited 3,804.72 3,786.40 Completed administration, monitoring Quotations Envelope 29 28 02 30 01 04 DE BUREAUX and social accountability DG20_DC_PC_TABLET_2014 Component 1: Building a Request for Single Stage - One 2020-07- 2020-08- 2020-09- / Acquisition de tablettes et IDA / D4340 safety net for the poor in Post Limited 50,000.00 0.00 Canceled Quotations Envelope 13 24 21 powerbank selected rural areas DG20_DC_ Component 1: Building a PRINT_THERM_2016 / Request for Single Stage - One 2020-07- 2020-09- 2020-10- IDA / D4340 safety net for the poor in Post Limited 45,000.00 0.00 Canceled Acquisition d'imprimantes Quotations Envelope 27 07 05 selected rural areas thermiques DG20_DC_EQPT_COMM_201 2 / Acquisition de matériels et équipements pour le service communication Component 1: Building a Under Request for Single Stage - One 2020-07- 2020-09- 2020-08- 2020-09- répartis en trois (03) lots : IDA / D4340 safety net for the poor in Post Limited 20,000.00 0.00 Implement Quotations Envelope 20 11 31 28 Lot N°01 : Appareils photo selected rural areas ation numériques Lot N°02 : Dictaphones Lot N°03 : Interphones DG20_DC_MATINFO_2015 / Acquisition d'équipements informatiques et techniques Component 2: répartis en trois (03) lots : Strengthening safety net Request for Single Stage - One 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- IDA / D4340 Post Limited 100,000.00 7,654.08 Signed LOT N°01 : Ordinateurs administration, monitoring Quotations Envelope 05 12 30 28 29 portables and social accountability LOT N°02 : Onduleurs LOT N°03 : Clés USB DRP82_DC_FOURNALPHA20 03 / Acquisition des Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-11- 2020-12- fournitures de bureau, IDA / D4340 safety net for the poor in Post Limited 3,400.00 0.00 Implement Quotations Envelope 22 10 10 consomptibles selected rural areas ation informatiques repartis en deux lots. DRA12 DC FRN 20001 / Acquisition de divers Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-11- 2020-12- matériels, matériaux et des IDA / D4340 safety net for the poor in Post Limited 35,800.00 0.00 Implement Quotations Envelope 22 03 03 intrants pour les selected rural areas ation bénéficiaires du programme TMDH ET FSP DRK_DC_FRN_BENEF_FSP/T Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-11- 2021-01- MDH20 / Acquisition de IDA / D4340 safety net for the poor in Post Limited 9,400.00 0.00 Implement Quotations Envelope 22 03 02 divers goodies selected rural areas ation DRK_DC_FRN_EP_FSP/TMDH 20 / Acquisition des Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-11- 2021-01- matériaux divers pour IDA / D4340 safety net for the poor in Post Limited 98,000.00 0.00 Implement Quotations Envelope 22 03 02 l'amélioration des espaces selected rural areas ation physiques TMDH et FSP Page 2 DRT11 DC FR MAT 20001 / Component 1: Building a Pending Acquisition des intrants Request for Single Stage - One 2020-09- 2020-10- 2021-03- IDA / D4340 safety net for the poor in Post Limited 6,329.00 0.00 Implement agricoles pour les ménages Quotations Envelope 21 30 31 selected rural areas ation bénéficiaires du TMDH. DRT11 DC FR SEC 20001 / Component 1: Building a Pending Acquisition de fournitures Request for Single Stage - One 2020-09- 2020-11- 2020-12- IDA / D4340 safety net for the poor in Post Limited 592.00 0.00 Implement diverses pour la sécurisation Quotations Envelope 27 05 05 selected rural areas ation du bureau du FID DRT12 DC FR LOTS 20001 Component 1: Building a Pending Request for Single Stage - One 2020-10- 2020-11- 2020-12- / Acquisition de divers IDA / D4340 safety net for the poor in Post Limited 9,610.00 0.00 Implement Quotations Envelope 01 11 11 goodies pour le TMDH selected rural areas ation DG20_DC_SECURITE_PANNE Component 1: Building a Under AU_2036 / Acquisition Request for Single Stage - One 2020-11- 2021-03- 2020-12- 2021-01- IDA / D4340 safety net for the poor in Post Limited 2,000.00 0.00 Implement panneaux d'indication Quotations Envelope 02 24 28 27 selected rural areas ation lumineux DRF11 DC_VIDEO 2001 / Component 1: Building a Request for Single Stage - One 2020-11- 2020-12- 2020-12- 2020-12- 2021-01- Tournage video succes story IDA / D4340 safety net for the poor in Post Limited 4,500.00 172.33 Signed Quotations Envelope 01 02 20 15 19 du programme TMDH et FSP selected rural areas DRF 12_DC_FRN_BENEF Component 1: Building a 2003 / Acquisition des Request for Single Stage - One 2020-10- 2020-11- 2020-12- 2020-11- 2021-01- IDA / D4340 safety net for the poor in Post Limited 8,450.00 7,234.73 Signed divers goodies pour les Quotations Envelope 28 11 15 27 14 selected rural areas Mères Leaders et CPS DG20_DC_KIT_FRNT_2039 Component 1: Building a Pending Request for Single Stage - One 2020-11- 2021-01- 2021-02- / Acquisition de divers IDA / D4340 safety net for the poor in Post Limited 65,000.00 0.00 Implement Quotations Envelope 06 08 07 fournitures et petits selected rural areas ation matériels DG20_DC_PNEUS_GROUPE_2 Component 1: Building a Under Request for Single Stage - One 2020-10- 2020-10- 2020-12- 2021-03- 040 / Acquisition groupée IDA / D4340 safety net for the poor in Post Limited 70,000.00 19,882.06 Implement Quotations Envelope 28 23 30 30 des enveloppes selected rural areas ation pneumatiques DG20_DC_GOODIES2021_20 Component 1: Building a Request for Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- 2021-01- 08 / Acquisition de goodies IDA / D4340 safety net for the poor in Post Limited 5,000.00 9,414.12 Signed Quotations Envelope 12 12 22 06 06 pour 2021 selected rural areas DG20_ED_SUPPL_NUT_2041 / Acquisition de supplément Component 1: Building a nutritionnel (Plumpy Sup) 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2020-11- 2021-03- IDA / D4340 safety net for the poor in Post Direct Selection Direct 800,000.00 586,813.42 Signed destinés aux régions 12 12 12 06 03 24 03 selected rural areas victimes de la Malnutrition Aigüe Modérée (MAM) DG20_ED_SUPPL_NUT_2042 / Acquisition de supplément Component 1: Building a nutritionnel (Plumpy Sup) 2020-10- 2020-10- 2020-10- 2020-10- 2020-11- 2020-11- 2020-11- IDA / D4340 safety net for the poor in Post Direct Selection Direct 5,000.00 3,738.81 Signed destiné aux régions victimes 25 20 25 20 08 02 15 selected rural areas de la Malnutrition Aigüe Modérée (MAM) DG20_DC_FRNT_2038 / Component 1: Building a Pending Request for Single Stage - One 2020-11- 2021-01- 2021-09- Acquisition de fournitures IDA / D4340 safety net for the poor in Post Limited 30,000.00 0.00 Implement Quotations Envelope 19 21 15 de bureau selected rural areas ation DG20_DC_PRODENTRET_20 Component 1: Building a Pending Request for Single Stage - One 2020-11- 2021-01- 2021-09- 40 / Acquisition de produits IDA / D4340 safety net for the poor in Post Limited 10,000.00 0.00 Implement Quotations Envelope 19 21 15 d'entretien selected rural areas ation DG20_DC_CONSINFO_2039 Component 1: Building a Pending Request for Single Stage - One 2020-11- 2021-01- 2021-09- / Acquisition de IDA / D4340 safety net for the poor in Post Limited 90,000.00 0.00 Implement Quotations Envelope 19 21 15 consomptibles selected rural areas ation informatiques DRU12MPE21001 / Acquisition des outils et Component 1: Building a Pending matériels pour Espaces Request for Single Stage - One 2020-12- 2021-02- 2021-04- IDA / D4340 safety net for the poor in Post Limited 13,400.00 0.00 Implement physiques en DPEI des Quotations Envelope 15 09 10 selected rural areas ation Bénéficiaires TMDH - Betioky Sud et Toliara II DRA12 DC FRN 20006 / Acquisition de divers Component 1: Building a Pending Request for Single Stage - One 2020-12- 2021-01- 2021-07- matériels et des intrants IDA / D4340 safety net for the poor in Post Limited 8,600.00 0.00 Implement Quotations Envelope 07 20 19 pour les bénéficiaires du selected rural areas ation programme TMDH ET FSP DG20_DC_TPE_CARTE_2041 / Acquisition de TPE et Component 1: Building a Pending Request for Single Stage - One 2020-12- 2021-01- 2021-02- cartes destinés aux IDA / D4340 safety net for the poor in Post Limited 95,000.00 0.00 Implement Quotations Envelope 02 13 12 bénéficiaires et sites pilotes selected rural areas ation pour le nouveau mécanisme de paiements DRF20_DC FRN_CABLAGE RESEAUX / Acquisition de Component 1: Building a fournitures et accessoires Request for Single Stage - One 2020-12- 2020-12- 2021-01- 2020-12- 2021-01- IDA / D4340 safety net for the poor in Post Limited 1,400.00 1,925.64 Signed pour les réseaux Quotations Envelope 08 03 13 12 18 selected rural areas téléphonique et internet_ Nouveau bureau Antenne Ambositra DRF_DC_FRN ALPHA_2004 / Acquisition des fournitures pour le centre Component 1: Building a Request for Single Stage - One 2021-01- 2021-01- 2021-02- 2021-02- 2021-03- Alphabétisation du IDA / D4340 safety net for the poor in Post Limited 5,200.00 1,241.64 Signed Quotations Envelope 13 27 04 25 06 programme FSP Isandra et selected rural areas Manandriana ainsi que du programme TMDH Ambohimahasoa DG_DC_MOB_ANTENNES_21 Component 1: Building a Under 01 / Acquisition de Request for Single Stage - One 2021-01- 2021-03- 2021-03- 2021-04- IDA / D4340 safety net for the poor in Post Limited 10,000.00 0.00 Implement mobiliers de bureau Quotations Envelope 30 04 20 19 selected rural areas ation destinés à la mise en place des antennes du FID DG_DC_GROUPE_ELECT_210 Component 1: Building a Pending 3 / Acquisition d'un groupe Request for Single Stage - One 2021-01- 2021-03- 2021-05- IDA / D4340 safety net for the poor in Post Limited 15,000.00 0.00 Implement électrogène destiné à Quotations Envelope 30 20 19 selected rural areas ation l'Antenne du FID à Ambositra DRA12 DC FRN 20009 / Acquisition de diverses Component 1: Building a Pending fournitures pour les Request for Single Stage - One 2021-01- 2021-03- 2021-03- IDA / D4340 safety net for the poor in Post Limited 35,800.00 0.00 Implement bénéficiaires du programme Quotations Envelope 27 01 31 selected rural areas ation TMDH ET FSP réparties en six (06) lots DRA13DC FRNTALPHABETISATION / Component 1: Building a Pending Request for Single Stage - One 2021-01- 2021-02- 2021-03- Acquisition de fournitures IDA / D4340 safety net for the poor in Post Limited 1,700.00 0.00 Implement Quotations Envelope 27 18 20 scolaires pour selected rural areas ation l'alphabétisation_Lot unique DG_DC_ANTIVIRUS_2104 / Component 1: Building a Request for Single Stage - One 2021-02- 2021-02- 2021-03- 2021-04- 2021-04- Acquisition de logiciels IDA / D4340 safety net for the poor in Post Limited 10,000.00 5,799.26 Signed Quotations Envelope 06 15 27 19 26 antivirus selected rural areas DG_DC_TPE_NFC_21007 / Acquisition de TPE et cartes Component 1: Building a Under Request for Single Stage - One 2021-02- 2021-02- 2021-04- 2021-05- destinés aux bénéficiaires et IDA / D4340 safety net for the poor in Post Limited 40,000.00 0.00 Implement Quotations Envelope 22 26 05 05 sites pilotes pour le selected rural areas ation nouveau mécanisme de paiements DG_DC_APPAREILS_TELEPH_ Component 1: Building a Under 21002 / Acquisition de Request for Single Stage - One 2021-02- 2021-03- 2021-04- 2021-05- IDA / D4340 safety net for the poor in Post Limited 7,500.00 0.00 Implement postes téléphoniques fixes, Quotations Envelope 20 24 10 10 selected rural areas ation autocom avec standard DG_DC_MAT_INFO_21003 / Component 1: Building a Under Acquisition de matériels Request for Single Stage - One 2021-03- 2021-05- 2021-06- IDA / D4340 safety net for the poor in Post Open - National 95,000.00 0.00 Implement informatiques répartis en Quotations Envelope 13 03 02 selected rural areas ation deux (02) lots DG_21011_EQPT_INFO / Component 1: Building a Pending Acquisition de divers Request for Single Stage - One 2021-05- 2021-06- 2021-07- IDA / D4340 safety net for the poor in Post Open - National 50,000.00 0.00 Implement équipements informatiques Quotations Envelope 05 25 25 selected rural areas ation répartis en 4 lots DRP_21002_DC_INTRANT_M ORINGA / Acquisition des Component 1: Building a Pending Request for Single Stage - One 2021-05- 2021-06- 2021-08- semences de moringa pour IDA / D4340 safety net for the poor in Post Open - National 9,500.00 0.00 Implement Quotations Envelope 09 21 05 les groupes des ménages selected rural areas ation bénéficiaires DG_21014_DC_APN / Component 1: Building a Pending Acquisition d'appareil photo Request for Single Stage - One 2021-05- 2021-07- 2021-08- IDA / D4340 safety net for the poor in Post Open - National 5,000.00 0.00 Implement numérique avec accessoires Quotations Envelope 22 03 17 selected rural areas ation pour le FID DRF_21003_DC_ACHAT Component 1: Building a Pending Request for Single Stage - One 2021-05- 2021-07- 2021-07- PNEUS / ACHAT DES PNEUS IDA / D4340 safety net for the poor in Post Open - National 5,882.35 0.00 Implement Quotations Envelope 11 06 26 BF ANTI-BOUES selected rural areas ation DRU_21001_DC_CONCOURS MEILLEURSGT / Acquisition des lots pour le concours meilleurs groupes de travail, Component 1: Building a Pending Request for Single Stage - One 2021-06- 2021-07- 2021-08- Mères Leaders, AVEC, IDA / D4340 safety net for the poor in Post Open - National 14,500.00 0.00 Implement Quotations Envelope 19 24 23 adoptant, et meilleur CGE selected rural areas ation pour les 3 interventions du FSP- Ankazoabo sud répartis en deux (02) lots. DRK_21005_DC_ALPH_TMD HFSP / Acquisition de Component 1: Building a Pending Request for Single Stage - One 2021-06- 2021-08- 2021-10- fournitures et outillages en IDA / D4340 safety net for the poor in Post Open - National 7,750.00 0.00 Implement Quotations Envelope 15 10 09 deux lots pour la formation selected rural areas ation d'alphabétisation TMDH et FSP DRK_21001_DC_TROPH_MEI LLEURE / Acquisition des Component 1: Building a Pending divers trophées réparties en Request for Single Stage - One 2021-06- 2021-07- 2021-08- IDA / D4340 safety net for the poor in Post Open - National 5,700.00 0.00 Implement deux (02) lots pour les Quotations Envelope 15 20 19 selected rural areas ation meilleurs groupes, adoptant, site IP, site AVEC DRF_21006_DC_ALPHA / Achat des Fournitures pour Component 1: Building a Pending Request for Single Stage - One 2021-06- 2021-08- 2021-08- les nouveaux centres IDA / D4340 safety net for the poor in Post Limited 4,864.86 0.00 Implement Quotations Envelope 09 04 24 d'Alphabétisation réparties selected rural areas ation en 02 Lots FSP et TMDH DRA_21004_DC_CONCOURS MEILLEURS GROUPE / Acquisition des lots pour le Component 1: Building a Pending concours des meilleurs Request for Single Stage - One 2021-06- 2021-07- 2021-08- IDA / D4340 safety net for the poor in Post Open - National 5,670.00 0.00 Implement groupe AVEC - ML - RC - Quotations Envelope 21 26 25 selected rural areas ation ALPHABETISEURS - adoptants des bénéficiaires TMDH - FSP , repartis en quatre (04) Lots DRT_21004_DC_TROPH_MEI LLEUR_FSP / Acquisition de lots pour les concours Component 1: Building a Pending organisés au niveau des Request for Single Stage - One 2021-07- 2021-08- 2021-09- IDA / D4340 safety net for the poor in Post Open - National 19,962.16 0.00 Implement Groupes de travail FSP dans Quotations Envelope 05 12 11 selected rural areas ation les Districts d'Antanifotsy et d'Arivonimamo, répartis en quatre (04) lots. DG_21015_CONSOM_INFO Component 1: Building a Pending Request for Single Stage - One 2021-06- 2021-08- 2021-12- / Acquisition de IDA / D4340 safety net for the poor in Post Open - National 95,000.00 0.00 Implement Quotations Envelope 21 16 31 consomptibles selected rural areas ation informatiques DG_DC21016_FRNT_ENTRET Component 1: Building a Pending / Acquisition de fournitures Request for Single Stage - One 2021-06- 2021-08- 2022-02- IDA / D4340 safety net for the poor in Post Open - National 50,000.00 0.00 Implement de bureau et produits Quotations Envelope 23 18 14 selected rural areas ation d'entretien NON CONSULTING SERVICES Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual DRF11CFPAI17001 / Component 1: Building a MARCHES MULTIPLES POUR Single Stage - One 2017-04- 2017-09- 2017-04- 2017-09- 2017-05- 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2019-06- 2019-10- IDA / 57080 safety net for the poor in Post Request for Bids Limited 2,363.33 17,273.54 Signed LE PAIEMENT DES Envelope 18 14 21 14 22 25 25 25 02 03 03 18 selected rural areas BÉNÉFICIAIRES ACTP DRF12CFPAI17002 / Component 1: Building a MARCHES MULTIPLES POUR Single Stage - One 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- 2019-08- IDA / 57080 safety net for the poor in Post Request for Bids Limited 8,459.93 0.00 Canceled LE PAIEMENT DES Envelope 19 21 25 27 10 10 selected rural areas BÉNÉFICIAIRES TMDH DRT12CFPAI17001 / Component 1: Building a Single Stage - One 2017-05- 2017-05- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2019-11- Marché multiple pour IDA / 57080 safety net for the poor in Post Request for Bids Limited 5,198.00 3,463.83 Signed Envelope 02 16 08 16 07 23 10 30 17 02 30 paiement des bénéficiaires selected rural areas TMDH DRT12PRPAI17001 / Component 1: Building a Single Stage - One 2017-08- 2017-09- 2017-09- 2017-09- 2017-10- 2019-11- Marché multiple pour IDA / 57080 safety net for the poor in Post Request for Bids Limited 13,819.00 0.00 Canceled Envelope 30 05 15 30 06 30 paiement des bénéficiaires selected rural areas du TMDH (lot 1) DRT12PRPAI17002 / Component 1: Building a Single Stage - One 2017-08- 2017-09- 2017-09- 2017-09- 2017-10- 2019-11- Marché multiple pour IDA / 57080 safety net for the poor in Post Request for Bids Limited 10,730.00 0.00 Canceled Envelope 30 05 15 30 06 30 paiement des bénéficiaires selected rural areas du TMDH (Lot 2) DRF11CFPAI18001 / Component 1: Building a MARCHES MULTIPLES POUR Single Stage - One 2018-04- 2018-04- 2018-04- 2018-05- 2019-05- IDA / 57080 safety net for the poor in Post Request for Bids Limited 2,363.33 0.00 Canceled LE PAIEMENT DES Envelope 10 15 25 08 08 selected rural areas BÉNÉFICIAIRES ACTP DRF12CFPAI18001 / Component 1: Building a MARCHES MULTIPLES POUR Single Stage - One 2018-02- 2018-03- 2018-03- 2018-03- 2019-03- IDA / 57080 safety net for the poor in Post Request for Bids Limited 7,156.06 0.00 Canceled LE PAIEMENT DES Envelope 27 04 11 22 22 selected rural areas BÉNÉFICIAIRES TMDH Component 2: DG20TOMWEB / Migration Strengthening safety net 2020-01- 2019-12- 2020-01- 2019-12- 2020-02- 2020-02- 2020-03- IDA / D4340 Post Direct Selection Direct 30,000.00 34,786.07 Signed vers TOM WEB administration, monitoring 16 20 21 19 25 20 26 and social accountability DG20AORTRANSMONMOBBA Component 1: Building a Pending NK / Prestations de services Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-12- IDA / D4340 safety net for the poor in Post Request for Bids Limited 500,000.00 0.00 Implement de transfert monétaire par Envelope 13 18 17 03 01 31 selected rural areas ation Mobile Money - Marchés multiples DG20AORTRANSMONINSFIN / Prestations de services de Component 1: Building a Pending Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-12- transfert monétaire par les IDA / D4340 safety net for the poor in Post Request for Bids Limited 360,000.00 0.00 Implement Envelope 13 18 17 03 01 31 Institutions Financières - selected rural areas ation Marchés multiples DRU12AORTRANSMONAGEN TPAYEURS / Prestations de Component 1: Building a Single Stage - One 2020-01- 2020-09- 2020-01- 2020-09- 2020-02- 2020-10- 2020-03- 2020-12- 2020-04- 2020-12- 2020-12- services de transfert IDA / D4340 safety net for the poor in Post Request for Bids Limited 120,000.00 17,866.61 Signed Envelope 13 16 18 16 17 12 03 02 01 15 31 monétaire - Marchés selected rural areas multiples DRT12AORTRANSMONAGEN TPAYEURS / Prestations de Component 1: Building a Pending Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-12- services de transfert IDA / D4340 safety net for the poor in Post Request for Bids Limited 120,000.00 0.00 Implement Envelope 13 18 17 03 01 31 monétaire - Marchés selected rural areas ation multiples DRP82AORTRANSMONAGEN TPAYEURS / Prestations de Component 1: Building a Pending Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-12- services de transfert IDA / D4340 safety net for the poor in Post Request for Bids Limited 120,000.00 0.00 Implement Envelope 13 18 17 03 01 31 monétaire - Marchés selected rural areas ation multiples DRK11AORTRANSMONAGEN TPAYEURS / Prestations de Component 1: Building a Pending Single Stage - One 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-12- services de transfert IDA / D4340 safety net for the poor in Post Request for Bids Limited 120,000.00 0.00 Implement Envelope 13 18 17 03 01 31 monétaire - Marchés selected rural areas ation multiples DRF12AORTRANSMONAGEN TPAYEURS / Prestations de Component 1: Building a Single Stage - One 2020-01- 2020-09- 2020-01- 2020-09- 2020-02- 2020-10- 2020-03- 2020-11- 2020-04- 2020-12- 2020-12- services de transfert IDA / D4340 safety net for the poor in Post Request for Bids Limited 120,000.00 47,590.24 Signed Envelope 13 23 18 24 17 07 03 19 01 01 31 monétaire - Marchés selected rural areas multiples DRA13AORTRANSMONAGEN TPAYEURS / Prestations de Component 1: Building a Single Stage - One 2020-01- 2020-09- 2020-01- 2020-09- 2020-02- 2020-10- 2020-03- 2020-10- 2020-04- 2020-11- 2020-12- services de transfert IDA / D4340 safety net for the poor in Post Request for Bids Limited 120,000.00 6,434.50 Signed Envelope 13 17 18 17 17 06 03 27 01 10 31 monétaire - Marchés selected rural areas multiples DG20ED_TM_AIRTEL / Prestation de services de transfert monétaire (Octobre 2019 à Août 2020) TMDH dans les districts de Component 1: Building a 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- TOAMASINA II,MAHANORO, IDA / D4340 safety net for the poor in Post Direct Selection Direct 200,000.00 206,825.81 Signed 02 24 09 28 06 26 30 AMBOHIMAHASOA,VOHIPEN selected rural areas O, BETIOKY SUD, BETAFO,FARATSIHO ACTP dans le district de MANAKARA DG20ED_TM_OTIVTANA / Prestation de services de transfert monétaire (Octobre Component 1: Building a 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- 2019 à Août 2020) IDA / D4340 safety net for the poor in Post Direct Selection Direct 15,000.00 13,733.40 Signed 02 24 09 28 06 23 30 TMDH dans les districts de selected rural areas AMBOHIMAHASOA, BETAFO, FARATSIHO DG20ED_TM_ORANGE / Prestation de services de transfert monétaire (Octobre Component 1: Building a 2019 à Août 2020) 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 30,000.00 20,916.45 Signed ACTP dans les districts de 02 24 09 28 06 23 30 selected rural areas VATOMANDRY, ANTANIFOTSY, ISANDRA, MANAKARA Page 3 DG20ED_TM_OTIVZL / Prestation de services de Component 1: Building a transfert monétaire (Octobre 2020-03- 2020-03- 2020-04- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 30,000.00 0.00 Canceled 2019 à Août 2020) TMDH 02 09 06 30 selected rural areas dans les districts de TOAMASINA II,MAHANORO DRF11CFPAI20002 / Prestations de Services pour le Transferts Monétaires aux Component 1: Building a bénéficiaires de filets de 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-07- IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,560.00 3,193.21 Signed sécurités sociaux en Argent 03 27 08 04 12 31 11 selected rural areas Contre Travail Productif (ACTP) District ISANDRA. – LOT 02. DRP82EDAP20009 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,800.00 8,839.55 Signed communes ANTARITARIKA- 02 02 09 05 06 18 30 selected rural areas IMONGY-NIKOLY, District Tsihombe Lot 23 DRP82EDAP20012 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 30,000.00 24,266.00 Signed communes AMBAZOA- 02 02 09 28 06 27 30 selected rural areas ERADA-TSIMANANDA- AMBOVOMBE, District Ambovombe Lot 10 et Lot 14 DRF12CFPAI20001 / Prestations de Service pour le Transferts Monétaires des Component 1: Building a 2020-03- 2020-02- 2020-03- 2020-04- 2020-04- 2020-03- 2020-07- bénéficiaires TMDH dans les IDA / D4340 safety net for the poor in Post Direct Selection Direct 5,922.00 7,161.72 Signed 03 26 08 09 12 19 11 communes de Morafeno, selected rural areas Befeta et Ambatosoa - District Ambohimahasoa DRT12CFPAI20001 / Prestation de service de transfert monétaire aux bénéficiaires dans les cinq Component 1: Building a Fokontany de la Commune 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-09- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 7,859.88 7,510.34 Completed de Valabetokana et dans les 02 19 09 06 06 19 30 16 selected rural areas huit Fokontany de la Commune de Vinaninony Sud, District de Faratsiho, Région de Vakinankaratra. DRT11CFPAI20004 / Prestation de service de transfert monétaire aux bénéficiaires dans les trente Fokontany des six Terroirs Component 1: Building a (Ambohitompoina, 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-09- 2020-07- IDA / D4340 safety net for the poor in Post Direct Selection Direct 8,745.40 7,506.63 Completed Ampitatafika, 02 19 09 06 06 02 30 23 selected rural areas Ambatotokana, Ambohikambana, Ambatomiady, Antambohomena), dans le District d'Antanifotsy, Région de Vakinankaratra. DRP82EDAP20018 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 9,200.00 9,699.37 Signed communes AMBOHIMALAZA, 02 02 09 28 06 25 30 selected rural areas ANALAMARY, AMBONAIVO, District Ambovombe. Lot 13 DRT12CFPAI20002 / Prestation de service de transfert monétaire aux bénéficiaires du TMDH dans Component 1: Building a les cinq Fokontany de la 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-09- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,987.77 6,676.57 Completed Commune d'Andranomiady 02 19 09 06 06 19 30 22 selected rural areas et dans les sept Fokontany de la Commune de Vinaninony Sud, District de Faratsiho, Région de Vakinankaratra. DRF11CFPAI20003 / Prestations de Services pour le Transferts Monétaires aux Component 1: Building a bénéficiaires de filets de 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-07- IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,608.00 3,193.21 Signed sécurités sociaux 03 27 08 04 12 31 11 selected rural areas en Argent Contre Travail Productif (ACTP) District ISANDRA. – LOT 03. DRP82EDAP20004 / Prestation de service de transfert monétaire aux bénéficiaires dans les Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- communes ANKARANABO IDA / D4340 safety net for the poor in Post Direct Selection Direct 17,200.00 30,085.64 Signed 02 02 09 27 06 24 30 NORD, ANTSAKOAMARO, selected rural areas MAROVIRO, MORAFENO BEKILY, TSIKOLAKY, District Bekily. Lot 19 et Lot 22 DRP82EDAP20014 / Prestation de service de transfert monétaire aux Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- bénéficiaires dans la IDA / D4340 safety net for the poor in Post Direct Selection Direct 10,200.00 8,918.64 Signed 02 02 09 27 06 20 30 commune MAROLINTA, selected rural areas District Beloha. Lot 18 DRP82EDAP20003 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 19,600.00 27,759.40 Signed communes AMBOVOMBE et 02 02 09 28 06 27 30 selected rural areas SIHANAMARO, District Ambovombe. Lot 15 et Lot 03 DRP82EDAP20010 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 26,900.00 29,548.28 Signed communes MAROALOPOTY- 02 02 09 27 06 26 30 selected rural areas TSIHOMBE, District Ambovombe et Tsihombe. Lot 02 et Lot 25 DRP82EDAP20016 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 29,200.00 22,824.76 Signed communes SIHANAMARO- 02 02 09 28 06 27 30 selected rural areas AMBOASARY, District Ambovombe et Amboasary. Lot 04 et Lot 29 DRP82EDAP20017 / Prestation de service de transfert monétaire aux Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- bénéficiaires dans la IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,900.00 9,058.43 Signed 02 02 09 28 06 27 30 commune AMBOASARY sud, selected rural areas District Amboasary sud. Lot 30 DRF11CFPAI20001 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires de filets de 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 3,416.00 2,794.21 Signed sécurités sociaux 02 27 09 04 06 31 30 selected rural areas en Argent Contre Travail Productif (ACTP) District ISANDRA. – LOT 01. DRU11EDAP20003 / Prestation de service de transfert monétaire aux Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-04- 2020-09- bénéficiaires dans TERROIR IDA / D4340 safety net for the poor in Post Direct Selection Direct 1,638.98 3,785.39 Signed 02 02 09 09 06 14 30 01D TANANDAVA – FSP selected rural areas DISTRICT ANKAZOABO – REGION ATSIMO ANDREFANA DRF11CFPAI20005 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires de filets de 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-07- IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,360.00 3,360.48 Signed sécurités sociaux 03 27 08 04 12 31 11 selected rural areas en Argent Contre Travail Productif (ACTP) District ISANDRA. – LOT 05. DRA11CFPAI20003 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires ACT P dans 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 7,905.00 5,197.31 Signed le DISTRICT VATOMANDRY 02 26 09 06 06 19 30 selected rural areas TERROIRS ILAKA EST - AMPANALANA - NIAROVANA - ANDRORANGA DRP82EDAP20007 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 39,800.00 19,860.88 Signed communes ANJAMPALY- 02 02 09 27 06 20 30 selected rural areas TRANOVAHO, District Tsihombe et Beloha. Lot 07 et Lot 06 DRP82EDAP20015 / Prestation de service de transfert monétaire aux Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-04- 2020-09- bénéficiaires dans la IDA / D4340 safety net for the poor in Post Direct Selection Direct 13,000.00 12,532.32 Signed 02 02 09 28 06 09 30 commune selected rural areas MAROALOMAINTY, District Ambovombe Lot 11 DRP82EDAP20006 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,800.00 13,247.38 Signed communes 02 02 09 28 06 26 30 selected rural areas ANDALATANOSY, MAROVATO BEFENO, District Ambovombe Lot 12 DRK12CFPAI20002 / Prestation de service de transfert monétaire aux bénéficiaires du programme Component 1: Building a Filets sociaux de sécurités, 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 14,000.00 5,395.76 Signed composante TMDH dans le 02 06 09 28 06 19 30 selected rural areas District de Vohipeno : Commune Rurale de Mahazoarivo et Commune Rurale d'Ilakatra. DRP82EDAP20019 / Prestation de service de Component 1: Building a transfert monétaire aux 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,600.00 7,317.23 Signed bénéficiaires dans la 02 02 09 28 06 27 30 selected rural areas commune de BEHARA, District Amboasary sud DRK12CFPAI20001 / Prestation de transfert Monétaire aux bénéficiaires des filets sociaux de Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- sécurités " composante IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,131.53 4,604.70 Signed 02 06 09 28 06 19 30 TMDH" dans le District de selected rural areas Vohipeno : Commune Rurale de MAHASOABE et Commune Rurale de SAHALAVA DRK11CFPAI20001 / Prestation de service de transfert monétaire aux bénéficiaires du programme Component 1: Building a Argent Contre Travail 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2020-04- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 8,024.80 6,496.78 Signed Productif dans le District de 02 28 09 28 06 01 30 selected rural areas Manakara pour les Terroirs suivants : IONILAHY, AMBORONDRA, VOHIMASINA SUD, AMBAHIVE, VOHILAVA. DRP82EDAP20002 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 23,000.00 12,663.76 Signed communes de BEVITIKY, 02 02 09 27 06 24 30 selected rural areas MANAKOMPY, TANAMBAO TSIRANDRANY. Lot 20 DRP82EDAP20013 / Prestation de service de transfert monétaire aux Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- bénéficiaires dans les IDA / D4340 safety net for the poor in Post Direct Selection Direct 34,800.00 15,996.55 Signed 02 02 09 27 06 23 30 communes KOPOKY- selected rural areas BELOHA, District Beloha Lot 17 et Lot 16 DRT11CFPAI20002 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les onze 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 3,303.70 3,798.71 Signed Fokontany des deux 02 19 09 06 06 02 30 selected rural areas Terroirs (Ambilona, Mananitra), dans le District d'Antanifotsy, Région de Vakinankaratra. DRU11EDAP20004 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-04- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,576.23 3,257.16 Signed TERROIRS 05D TANDRANO 02 02 09 09 06 14 30 selected rural areas ET 06D ANTSOHA – FSP DISTRICT ANKAZOABO – REGION ATSIMO ANDREFANA DRP82EDAP20005 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 13,500.00 16,760.14 Signed communes ANIVORANO 02 02 09 27 06 24 30 selected rural areas MITSINJO et BERAKETA, District Bekily. Lot 21 DRU11EDAP20002 / Prestation de service de transfert monétaire aux bénéficiaires dans Component 1: Building a TERROIRS 02D MIARY- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-04- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,020.70 4,065.14 Signed CENTRE, 07D 02 02 09 09 06 14 30 selected rural areas ANKILIVALOBE, 08D ANKILIMARO ET 09D ANDRANOTERAKY – FSP DISTRICT ANKAZOABO – REGION ATSIMO ANDREFANA DRK11CPAI20002 / Prestation de service de transfert monétaires aux bénéficiaires du programme Component 1: Building a 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2020-04- 2020-09- ACT_P dans District de IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,348.10 4,548.45 Signed 02 28 09 28 06 01 30 Manakara pour les terroirs : selected rural areas AMBOHITROVA, SAHANAMBOHITRA, BENIHAONANA, FIADANANA (CR Fenomby). DRF11CFPAI20004 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires de filets de 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-07- IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,544.00 3,718.23 Signed sécurités sociaux 03 27 08 04 12 30 11 selected rural areas en Argent Contre Travail Productif (ACTP) District ISANDRA. – LOT 04. DRP82EDAP20008 / Prestation de service de transfert monétaire aux Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- bénéficiaires dans la IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,600.00 8,317.64 Signed 02 02 09 27 06 24 30 commune BELINDO selected rural areas MAHASOA, District Bekily. Lot 09 DRP82EDAP20001 / Prestation de service de transfert monétaire aux Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- bénéficiaires dans la IDA / D4340 safety net for the poor in Post Direct Selection Direct 15,000.00 20,979.41 Signed 02 02 09 28 06 27 30 commune de Sampona, selected rural areas District Amboasary sud. Lot 26 DRP82EDAP20011 / Prestation de service de transfert monétaire aux bénéficiaires dans les Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- communes MAROVATO, IDA / D4340 safety net for the poor in Post Direct Selection Direct 35,300.00 43,429.71 Signed 02 02 09 27 06 27 30 FAUX CAP,NIKOLY CENTRE- selected rural areas TRANOVAHO, District de Tsihombe et Beloha. Lot 24 et Lot 05 DRT11CFPAI20001 / Prestation de service de transfert monétaire aux bénéficiaires dans les Component 1: Building a 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-09- 2020-07- quinze Fokontany des trois IDA / D4340 safety net for the poor in Post Direct Selection Direct 5,398.50 3,167.82 Completed 02 19 09 06 06 02 30 24 Terroirs (Tsarahonenana, selected rural areas Belanitra, Mahatsinjo), dans le District d'Antanifotsy, Région de Vakinankaratra. Page 4 DRU13APPC20001 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans les 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-09- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 38,303.05 23,907.85 Completed Communes d'ANDROKA et 02 02 09 09 20 25 16 14 selected rural areas ANKILIABO, District d'AMPANIHY - POST SECHERESSE DRU13APPC20002 / Prestation de service de transfert monétaire aux Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-09- 2020-09- bénéficiaires dans la IDA / D4340 safety net for the poor in Post Direct Selection Direct 8,793.96 5,489.19 Completed 02 02 09 09 20 25 16 04 Commune de TAMEANTSOA, selected rural areas District de BETIOKY SUD - POST SECHERESSE DRU11EDAP20001 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires dans 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-04- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,988.20 2,962.37 Signed TERROIRS 03D 02 02 09 09 06 11 30 selected rural areas ANKILIMIAVOTSE ET 04D AMPANDRAMITSETAKY – FSP DISTRICT ANKAZOABO – REGION ATSIMO ANDREFANA DRT11CFPAI20003 / Prestation de service de transfert monétaire aux bénéficiaires dans les douze Component 1: Building a 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-09- 2020-07- Fokontany des trois Terroirs IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,107.00 2,922.69 Completed 02 19 09 06 06 02 30 22 (Ambatodidy, Ambatolahy, selected rural areas Soamanandrariny), dans le District d'Antanifotsy, Région de Vakinankaratra. DRA11CFPAI20002 / Prestation de service de transfert monétaire aux bénéficiaires ACT P dans Component 1: Building a 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-09- le DISTRICT VATOMANDRY IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,535.00 4,582.39 Signed 02 26 09 06 06 19 30 TERROIRS SAHAMATEVINA selected rural areas - TANAMBAO VATRAKAKA - AMBODIVOANATO- AMBALAVOLO DRP82EDAP20020 / Prestation de service de Component 1: Building a 2020-03- 2020-03- 2020-03- 2020-02- 2020-04- 2020-03- 2020-09- transfert monétaire aux IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,900.00 10,263.08 Signed 02 02 09 28 06 23 30 bénéficiaires dans la selected rural areas commune MAROALOPOTY DRA11CFPAI20001 / Prestation de service de transfert monétaire aux Component 1: Building a bénéficiaires ACT P dans 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-10- IDA / D4340 safety net for the poor in Post Direct Selection Direct 8,095.00 4,100.25 Signed le DISTRICT VATOMANDRY 05 26 12 06 09 20 03 selected rural areas TERROIRS TSARASAMBO - BENGIVY - ANTANAMBAO MAHATSARA - TSIVANGIANA DG20ED_TM_PAOMA_2001 / Prestation de services de transfert monétaire (Octobre 2019 à Août 2020) dans les Component 1: Building a 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-05- 2020-09- nouvelles zones IDA / D4340 safety net for the poor in Post Direct Selection Direct 120,000.00 18,594.20 Signed 30 24 06 26 04 04 30 d'intervention du FID : selected rural areas Arivonimamo-Région Analamanga, Manadriana- Région Amoron'i Mania et Toliara2-Région Sud Ouest DG20ED_COVID_TMNC2005 / Prestation de services de Transfert Monétaire Non Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-08- Conditionnel (avril à mai IDA / D4340 safety net for the poor in Post Direct Selection Direct 250,000.00 22,706.01 Signed 11 10 18 10 28 21 10 2020) aux ménages selected rural areas vulnérables les plus touchés par le confinement DG20DC_OUTILS_SOCOP201 Component 1: Building a Pending 6 / Impression et Request for Single Stage - One 2020-04- 2020-05- 2020-06- IDA / 57080 safety net for the poor in Post Limited 5,000.00 0.00 Implement multiplication d’outils de Quotations Envelope 18 23 06 selected rural areas ation travail pour les SOCOP DG20DC_COVID_COMM201 7 / Multiplication d'outils de Component 1: Building a Pending Request for Single Stage - One 2020-04- 2020-04- 2020-05- sensibilisation dans le cadre IDA / 57080 safety net for the poor in Post Limited 15,000.00 0.00 Implement Quotations Envelope 16 22 06 de la mise en œuvre des selected rural areas ation TMNC (COVID19) DG20ED_COVID_TMNC2006 / Prestation de services de Transfert Monétaire Non Conditionnel (avril à mai Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-05- 2020-07- 2020) aux ménages IDA / D4340 safety net for the poor in Post Direct Selection Direct 50,000.00 70,110.76 Signed 20 10 27 10 11 22 10 vulnérables les plus touchés selected rural areas par le confinement - Antananarivo périphérie, Toamasina et Fianarantsoa DG20_DC__SUPPORT_COMM _2011 / Confection et livraison de divers supports de communication répartis Component 1: Building a Under en quatre (04) lots: Request for Single Stage - One 2020-07- 2020-08- 2020-08- 2020-09- IDA / D4340 safety net for the poor in Post Limited 10,000.00 0.00 Implement Lot N°01 : Stylo, clé USB, Quotations Envelope 14 28 25 22 selected rural areas ation supports en plexi, … Lot N°02 : Supports en tissus Lot N°03 : Supports en bâches Lot N°04 : Supports en DG20_ED_TMNC2007 / papier Prestation de services de Transfert Monétaire Non Component 1: Building a Conditionnel aux ménages 2020-08- 2020-07- 2020-08- 2020-07- 2020-08- 2020-08- 2020-10- IDA / D4340 safety net for the poor in Post Direct Selection Direct 45,000.00 47,220.02 Signed vulnérables les plus touchés 03 30 10 30 24 05 31 selected rural areas par le confinement - Antananarivo, Toamasina et Fianarantsoa DG20_ED_COVID_TMNC_20 08 / Prestation de services de Transfert Monétaire Non Conditionnel (TOSIKA Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-08- FAMENO) aux ménages IDA / D4340 safety net for the poor in Post Direct Selection Direct 15,000.00 15,188.75 Signed 01 10 01 10 06 22 04 vulnérables les plus touchés selected rural areas par le confinement - Antananarivo, Toamasina et Fianarantsoa DG20_ED_COVID_TMNC_20 09 / Prestation de services de Transfert Monétaire Non Conditionnel (TOSIKA Component 1: Building a 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-08- 2020-12- FAMENO) aux ménages IDA / D4340 safety net for the poor in Post Direct Selection Direct 20,000.00 20,930.40 Signed 21 24 21 24 11 27 10 vulnérables les plus touchés selected rural areas par le confinement - Antananarivo, Toamasina et Fianarantsoa DRA11 DC VIDEO 20003 / Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-11- 2021-03- Tournage vidéo de success IDA / D4340 safety net for the poor in Post Limited 4,800.00 0.00 Implement Quotations Envelope 29 17 17 story FSP et TMDH selected rural areas ation DRA12 DC LOCVOITURE Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-11- 2021-02- 20004 / Location de IDA / D4340 safety net for the poor in Post Limited 4,500.00 0.00 Implement Quotations Envelope 22 03 01 voitures de transport selected rural areas ation DG20_DC_CABSAISIEPLAINT E_2033 / Prestation de Component 1: Building a Request for Single Stage - One 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- service d'un cabinet chargé IDA / D4340 safety net for the poor in Post Limited 1,500.00 880.65 Signed Quotations Envelope 15 08 27 29 10 de saisie des plaintes reçues selected rural areas _ Tosika Fameno DRK_DC_VIDEO_FSP/TMDH2 Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-10- 2020-12- 0 / Tournage Vidéo de IDA / D4340 safety net for the poor in Post Limited 6,000.00 0.00 Implement Quotations Envelope 10 29 28 success story à Manakara et selected rural areas ation Vohipeno DRK_DC_LOC_VEH_FSP/TMD Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-11- 2021-02- H20 / Location de véhicules IDA / D4340 safety net for the poor in Post Limited 10,100.00 0.00 Implement Quotations Envelope 24 12 10 de transport selected rural areas ation DRP82_DC_LOCATIONVOI20 Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-10- 2020-12- 04 / Location de voitures _ IDA / D4340 safety net for the poor in Post Limited 42,700.00 0.00 Implement Quotations Envelope 25 25 24 Région Anosy selected rural areas ation DRP82_DC_TOURNVIDEO20 Component 1: Building a Pending 05 / Tournage vidéo pour Request for Single Stage - One 2020-09- 2020-10- 2020-12- IDA / D4340 safety net for the poor in Post Limited 2,100.00 0.00 Implement les activités AVEC et Quotations Envelope 25 25 24 selected rural areas ation inclusion productive DRP82_DC_IMPRESOUTIL200 Component 1: Building a Pending Request for Single Stage - One 2020-10- 2020-10- 2020-11- 6 / Impression et IDA / D4340 safety net for the poor in Post Limited 2,600.00 0.00 Implement Quotations Envelope 05 21 20 multiplication de documents selected rural areas ation DRT11 DC LOCVEH 20001 / Component 1: Building a Pending Location de véhicules de Request for Single Stage - One 2020-09- 2020-11- 2020-12- IDA / D4340 safety net for the poor in Post Limited 6,312.00 0.00 Implement transport pour FSP et TMDH Quotations Envelope 25 01 21 selected rural areas ation - 02 lots DRT11 DC EDIT REPRO Component 1: Building a Pending Request for Single Stage - One 2020-09- 2020-10- 2020-12- 20001 / Impression et IDA / D4340 safety net for the poor in Post Limited 5,871.00 0.00 Implement Quotations Envelope 21 28 27 multiplication de documents selected rural areas ation - 03 lots Component 1: Building a Pending DRT11 PROD VID 20001 / Request for Single Stage - One 2020-10- 2020-11- 2021-01- IDA / D4340 safety net for the poor in Post Limited 1,351.00 0.00 Implement Tournage vidéo pour le FSP Quotations Envelope 07 13 12 selected rural areas ation DRA12 DC EDIT REPRO Component 1: Building a Pending 20005 / Impression et Request for Single Stage - One 2020-09- 2020-10- 2021-04- IDA / D4340 safety net for the poor in Post Limited 39,500.00 0.00 Implement multiplication de documents Quotations Envelope 24 31 29 selected rural areas ation et outils de travail DG20_DC_VIDEO_COMM_20 Component 1: Building a Pending Request for Single Stage - One 2020-11- 2021-01- 2021-07- 37 / Tournage vidéo pour la IDA / D4340 safety net for the poor in Post Limited 40,000.00 0.00 Implement Quotations Envelope 06 08 07 Direction Générale selected rural areas ation DRF DC_LOC VEH 2001 / Component 1: Building a Location de véhicules de Request for Single Stage - One 2020-10- 2021-03- 2020-12- 2021-03- 2021-01- IDA / D4340 safety net for the poor in Post Limited 6,500.00 699.60 Signed transport pour FSP et TMDH Quotations Envelope 26 16 18 26 17 selected rural areas - 02 lots DRF DC_MOB_2002 / Component 1: Building a Acquisition des mobiliers de Request for Single Stage - One 2020-10- 2020-08- 2020-12- 2020-11- 2021-01- IDA / D4340 safety net for the poor in Post Limited 4,170.00 3,191.74 Signed bureau pour l'antenne à Quotations Envelope 19 28 14 11 23 selected rural areas Ambositra DG20_AO_SUPPORTS_COMM _OUTILS_2007 / Impression Component 1: Building a Under Single Stage - One 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- 2021-04- et multiplication de IDA / D4340 safety net for the poor in Post Request for Bids Open - National 300,000.00 0.00 Implement Envelope 12 23 19 27 19 18 15 16 supports de communication selected rural areas ation et outils de travail DRP82_DC_TRANSMONAGE NTPAYEURS / Prestation de Component 1: Building a Pending Request for Single Stage - One 2020-12- 2021-02- 2021-07- Service de Transfert IDA / D4340 safety net for the poor in Post Limited 42,000.00 0.00 Implement Quotations Envelope 07 01 31 Monétaire _ Marché selected rural areas ation Multiple: Lot 07, Lot 11 et Lot 12 DRP82_ED_TRANSMONAGEN TPAYEURS / Prestation de service de transfert Component 1: Building a Pending 2020-11- 2020-11- 2020-12- 2021-01- monétaire aux bénéficiaires IDA / D4340 safety net for the poor in Post Direct Selection Direct 7,700.00 0.00 Implement 25 30 10 15 dans les communes selected rural areas ation Ambovombe, Tsihombe, Beraketa et Morafeno Bekily DRF20_ED_TRSF_2003 TMDH / Prestations de Component 1: Building a 2020-11- 2020-11- 2020-11- 2020-12- 2020-12- 2020-12- 2021-01- service pour le paiement IDA / D4340 safety net for the poor in Post Direct Selection Direct 1,390.00 1,234.98 Signed 25 26 30 01 20 15 19 des bénéficiaires du selected rural areas programme TMDH de la commune Camp Robin DRT12 ED TRANSMONAGENTPAYEUR Component 1: Building a Pending 2020-11- 2020-12- 2020-12- 2021-02- 20001 / Prestations de IDA / D4340 safety net for the poor in Post Direct Selection Direct 10,153.00 0.00 Implement 26 03 23 06 services de transfert selected rural areas ation monétaire. DRA11ED TRANSMONAGENTPAYEUR Component 1: Building a Under 2020-11- 2020-12- 2020-12- 2020-12- 2020-12- 2021-02- 20008 / Prestations de IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,000.00 314.91 Implement 27 09 04 15 24 07 services de transfert selected rural areas ation monétaire. DRK12EDTRANSMONAGENT PAYEUR2001 / Prestation de Component 1: Building a Pending 2020-11- 2020-12- 2020-12- 2021-02- services de transfert IDA / D4340 safety net for the poor in Post Direct Selection Direct 5,500.00 0.00 Implement 27 04 24 07 monétaire TMDH dans le selected rural areas ation District de Vohipeno DRU11CFLOC21001 / Prestation de service pour Component 1: Building a Pending location de voiture pour Request for Single Stage - One 2021-05- 2021-06- 2022-03- IDA / D4340 safety net for the poor in Post Limited 1,200.00 0.00 Implement visite d'échange des Quotations Envelope 10 09 31 selected rural areas ation Bénéficiaires FSP Ankazoabo Sud aux autres Districts DRU11CFPRO21001 / Prestation de service pour Component 1: Building a Pending Request for Single Stage - One 2020-12- 2021-01- 2022-03- tournage et production de IDA / D4340 safety net for the poor in Post Limited 1,800.00 0.00 Implement Quotations Envelope 06 11 31 film sucess story et selected rural areas ation réalisation - FSP Ankazoabo Sud DRU11APED20001 / Prestation de service de transfert monétaire, Agence Component 1: Building a payeur pour les 03 2020-11- 2020-12- 2020-12- 2020-12- 2020-12- 2020-12- 2021-02- IDA / D4340 safety net for the poor in Post Direct Selection Direct 3,900.00 1,591.59 Signed transferts, 9è intervention - 28 01 03 01 11 16 15 selected rural areas FSP ANKAZOABO SUD et le transfert octobre-décembre 2020 - TMDH Betioky Sud DRA11 DC VIDEO 20007 / Component 1: Building a Pending Prestation de service Request for Single Stage - One 2020-12- 2021-01- 2021-07- IDA / D4340 safety net for the poor in Post Limited 4,800.00 0.00 Implement :Tournage vidéo de success Quotations Envelope 07 20 19 selected rural areas ation story FSP et TMDH DRF21_DC_TRSF AGENTPAYEUR 2001 / Component 1: Building a Pending Prestations de services de Request for Single Stage - One 2021-01- 2021-03- 2021-09- IDA / D4340 safety net for the poor in Post Limited 80,000.00 0.00 Implement transfert monétaire pour le Quotations Envelope 30 27 23 selected rural areas ation programme FSP Manandriana -Marchés multiples DRA12 DC LOCVEHICULE Component 1: Building a Pending 20006 / Location de Request for Single Stage - One 2021-01- 2021-02- 2021-04- IDA / D4340 safety net for the poor in Post Limited 1,000.00 0.00 Implement véhicules pour Quotations Envelope 17 23 14 selected rural areas ation acheminement des supports et des jouets TMDH DRT11 DC LOCVEH 21001 / Location de véhicules de Component 1: Building a Pending Request for Single Stage - One 2021-02- 2021-03- 2021-05- transport de matériels IDA / D4340 safety net for the poor in Post Limited 2,702.00 0.00 Implement Quotations Envelope 17 19 08 MACC pour le FSP et TMDH selected rural areas ation sur sites, répartis en deux lots. DRU ED TRANSMONAGENTPAYEUR Component 1: Building a Pending 2021-02- 2021-02- 2021-03- 2021-09- 21001 / Prestations de IDA / D4340 safety net for the poor in Post Direct Selection Direct 13,200.00 0.00 Implement 12 19 08 30 services de transfert selected rural areas ation monétaire. DRK ED TRANSMONAGENTPAYEUR_2 1001 / Prestations de Component 1: Building a Pending 2021-02- 2021-02- 2021-03- 2021-10- service pour le paiement IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,800.00 0.00 Implement 12 17 24 03 des bénéficiaires du selected rural areas ation programme TMDH de la commune de VOHIPENO DRP_ED_TRANSMONAGENTP AYEURS21001 / Prestations de services de transfert monétaire avec le nouveau Component 1: Building a Pending 2021-02- 2021-02- 2021-03- 2021-09- mécanisme de paiement aux IDA / D4340 safety net for the poor in Post Direct Selection Direct 8,400.00 0.00 Implement 12 17 08 30 bénéficiaires dans les selected rural areas ation communes Ambovombe, Tsihombe, Beraketa et Morafeno Bekily DRT ED TRANSMONAGENTPAYEUR Component 1: Building a Pending 21001 / Prestations de 2021-02- 2021-02- 2021-03- 2021-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 11,755.00 0.00 Implement services de transfert 12 19 08 30 selected rural areas ation monétaire aux bénéficiaires du FSP et TMDH. DG_ED_TRANSFERTMON_21 006 / Prestations de services de transferts Component 1: Building a Pending 2021-02- 2021-02- 2021-03- 2021-09- monétaires avec le nouveau IDA / D4340 safety net for the poor in Post Direct Selection Direct 25,000.00 0.00 Implement 12 19 08 30 mécanisme de paiement aux selected rural areas ation bénéficiaires des programmes TMDH et ACTP DG_DC_IMPRESSION_CARTES Component 1: Building a Under Request for Single Stage - One 2021-02- 2021-03- 2021-03- 2021-05- _21008 / Impression et IDA / D4340 safety net for the poor in Post Limited 45,000.00 0.00 Implement Quotations Envelope 23 16 29 28 reprogrammation des cartes selected rural areas ation DRT12 DC PROD VID 21001 Component 1: Building a Pending / Tournage de vidéo sur Request for Single Stage - One 2021-03- 2021-05- 2021-07- IDA / D4340 safety net for the poor in Post Open - National 1,081.00 0.00 Implement l'inclusion productive du Quotations Envelope 11 14 13 selected rural areas ation TMDH. Page 5 DRU_21002_DC_LOCVOITUR ES_VISITES ECHTMDH / Locations de voitures pour Component 1: Building a Pending Request for Single Stage - One 2021-04- 2021-05- 2021-11- visites d'échange des IDA / D4340 safety net for the poor in Post Open - National 3,800.00 0.00 Implement Quotations Envelope 24 29 25 Bénéficiaires TMDH en deux selected rural areas ation (02) lots : Districts Betioky et Toliara II DRP_21003_DC_LOCVOITUR E_MATERIELDPEI / Location Component 1: Building a Pending Request for Single Stage - One 2021-05- 2021-07- 2021-08- de voiture pour le transport IDA / D4340 safety net for the poor in Post Open - National 5,000.00 0.00 Implement Quotations Envelope 12 08 07 des matériels DPEI vers les selected rural areas ation sites TMDH DG_21013_DC_MULTIPL_SU PPORTS / Impression et Component 1: Building a Pending Request for Single Stage - One 2021-06- 2021-08- 2021-10- multiplication de supports IDA / D4340 safety net for the poor in Post Open - National 30,000.00 0.00 Implement Quotations Envelope 22 10 09 de communication et outils selected rural areas ation de travail répartis en 03 lots DRK_21004_DC_FILM_COM Component 1: Building a Pending M / Enregistrement et Request for Single Stage - One 2021-06- 2021-08- 2022-02- IDA / D4340 safety net for the poor in Post Open - National 5,100.00 0.00 Implement tournage vidéo des Quotations Envelope 15 10 06 selected rural areas ation réalisations des activités FSP et TMDH DRK_21006_DC_DUPLI_DOC ALPHA / Duplication des Component 1: Building a Pending Request for Single Stage - One 2021-06- 2021-08- 2021-10- documents et livres pour IDA / D4340 safety net for the poor in Post Open - National 2,600.00 0.00 Implement Quotations Envelope 15 10 09 les apprenants de la selected rural areas ation formation Alphabétisation FSP et TMDH DRT_21010_DC_IMPR_FICHE SUIV_FSP / Impression de Component 1: Building a Pending Request for Single Stage - One 2021-06- 2021-07- 2021-08- fiche de suivi ménages pour IDA / D4340 safety net for the poor in Post Limited 368.11 0.00 Implement Quotations Envelope 13 22 21 les bénéficiaires FSP dans le selected rural areas ation District d'Antanifotsy CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual DRP83CFAGEX17001 / Component 1: Building a Consultant ENCADREMENT ACT POST 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-05- 2017-05- 2017-05- 2017-06- 2017-07- IDA / D1450 safety net for the poor in Post Qualification Open - National 4,375.00 6,543.44 Completed CATA RANOPISO REGION 07 05 14 01 09 10 17 14 19 13 13 selected rural areas Selection ANOSY DRP83CFAGEX17002 / Component 1: Building a Consultant ENCADREMENT ACT POST 2017-04- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- IDA / D1450 safety net for the poor in Post Qualification Open - National 4,375.00 0.00 Canceled CATA ANALAPATSY REGION 07 14 01 10 14 13 selected rural areas Selection ANOSY DRF11CFAGEC17001 / Component 1: Building a Quality And MARCHES MULTIPLES 2017-04- 2019-03- 2017-04- 2017-05- 2019-03- 2017-06- 2019-03- 2017-07- 2019-04- 2017-07- 2017-07- 2018-07- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 10,117.37 0.00 Canceled ENCADREMENT DES UTB EN 23 11 30 18 15 02 26 03 02 06 10 10 selected rural areas Selection ACTP DRA13MOINF17001 / Maitrise d'œuvre des Component 1: Building a Consultant 2017-05- 2017-07- 2017-05- 2017-05- 2017-07- 2017-06- 2017-07- 2017-06- 2017-08- 2018-12- 2019-03- infrastructures N°01 et N°02 IDA / 57080 safety net for the poor in Post Qualification Open - National 5,161.29 4,544.55 Completed 08 05 15 22 05 06 28 13 02 26 27 dans la région d' selected rural areas Selection Analanjirofo (Toamasina). DRK13CFMO17001 / MAITRISE D'ŒUVRE DES Component 1: Building a Least Cost 2017-05- 2017-06- 2017-05- 2017-05- 2017-07- 2017-06- 2017-07- 2017-06- 2017-07- 2017-06- 2017-08- 2017-06- 2017-08- 2017-12- 2018-04- TRAVAUX DE IDA / 57080 safety net for the poor in Post Open - National 3,870.97 5,215.22 Completed Selection 10 15 10 20 13 04 24 05 25 08 07 15 10 12 19 REHABILITATION DES selected rural areas OUVRAGRES VOHITRINDRY ILAKATRA DRP83CFBE17001 / Component 1: Building a Least Cost 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-06- 2017-07- 2017-06- 2017-07- 2017-06- 2017-07- 2017-07- 2017-08- 2018-12- 2019-09- MAITRISE D'OEUVRE EPP IDA / 57080 safety net for the poor in Post Open - National 6,774.19 5,600.27 Completed Selection 09 30 10 06 30 21 14 21 17 27 17 07 04 31 03 POST CATA ENAWO selected rural areas AMBOVOMBE 1 DRP83CFBE17002 / Component 1: Building a Least Cost 2017-05- 2017-07- 2017-05- 2017-06- 2017-06- 2017-06- 2017-07- 2017-06- 2017-07- 2017-06- 2017-07- 2017-07- 2017-08- 2018-12- 2019-07- MAITRISE D'OEUVRE EPP IDA / 57080 safety net for the poor in Post Open - National 9,032.26 7,169.65 Completed Selection 09 17 09 06 30 21 14 21 17 27 17 07 07 31 08 POSTENAWO AMBOVOMBE2 selected rural areas DG11CFAGFDF17001 / Agence chargée de l'élaboration d'un guide pour la formation des formateurs des agences de Component 1: Building a Consultant 2017-05- 2017-05- 2017-06- 2017-07- 2017-08- 2019-04- mise en oeuvre en matière IDA / 57080 safety net for the poor in Post Qualification Open - National 60,000.00 0.00 Canceled 12 19 11 25 02 30 d'épargne communautaire selected rural areas Selection et de développement d'affaires dans les activités ACT-P du Projet de Filets Sociaux mis en oeuvre par le FID DG23CFFORMSIG17002 / Component 2: Consultant Formation des personnels Strengthening safety net 2017-06- 2017-06- 2017-06- 2017-06- 2017-08- 2017-07- 2017-09- 2017-07- 2017-09- 2017-08- 2017-10- IDA / 57080 Post Qualification Open - National 693.75 1,580.42 Completed du FID sur l'utilisation des administration, monitoring 07 07 14 27 18 17 05 21 13 20 17 Selection SIG and social accountability DRT11CFPLAN17001 / Agence de planification Component 1: Building a Consultant chargée du suivi et 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 15,000.00 0.00 Canceled supervision des chantier, 18 19 07 27 03 26 selected rural areas Selection suivi évaluation communautaire, mise à jour des PAMO DRT11CFPLAN17002 / Agence de planification chargée du suivi et Component 1: Building a Consultant 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2019-04- supervision des chantiers, IDA / 57080 safety net for the poor in Post Qualification Open - National 15,000.00 0.00 Canceled 18 19 07 27 03 26 suivi évaluation selected rural areas Selection communautaire, mise à jour des PAMO DRT11CFPLAN17003 / Agence de planification chargée du suivi et Component 1: Building a Consultant 2017-07- 2017-07- 2017-08- 2017-08- 2017-09- 2019-04- supervision des chantiers, IDA / 57080 safety net for the poor in Post Qualification Open - National 15,000.00 0.00 Canceled 18 19 07 27 03 26 suivi évaluation selected rural areas Selection communautaire, mise à jour des PAMO DG81CFPLAT1701 / Component 1: Building a Consultant FOURNITURE DE SERVICE EN 2017-07- 2017-07- 2017-08- 2017-09- 2017-09- 2018-12- IDA / D1450 safety net for the poor in Post Qualification Open - National 30,000.00 0.00 Canceled PLATE FORME INTERNET DE 26 28 17 11 15 14 selected rural areas Selection COLLECTE DE DONNÉES DRK11CFSECCS1702 / Suivi- Évaluation Communautaire, Component 1: Building a Quality And 2017-08- 2017-08- 2017-09- 2017-10- 2017-10- 2017-10- 2017-10- 2020-04- Mis a jours PAMO, Contrôle IDA / 57080 safety net for the poor in Post Cost-Based Open - National 7,419.35 0.00 Canceled 21 22 10 08 12 19 29 16 et Suivi UTB ONILAHY - selected rural areas Selection FENOMBY - BENIHAONANA DRK11CFSECCS1703 / Suivi- Évaluation Communautaire, Mis a jours PAMO, Contrôle Component 1: Building a Quality And et Suivi UTB VOHILAVA - 2017-08- 2017-08- 2017-09- 2017-10- 2017-10- 2017-10- 2017-10- 2020-04- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 9,677.42 0.00 Canceled AMBOHIMANARIVO 21 22 10 08 12 19 29 16 selected rural areas Selection MANGAIKA - SAHANABOHITRA - AMBORONDRA DRK11CFSECCS1704 / Suivi- Évaluation Communautaire, Component 1: Building a Quality And 2017-08- 2017-08- 2017-09- 2017-10- 2017-10- 2017-10- 2017-10- 2020-04- Mis a jours PAMO, Contrôle IDA / 57080 safety net for the poor in Post Cost-Based Open - National 7,419.35 0.00 Canceled 21 22 10 08 12 19 29 16 et Suivi UTB MAROFARIHY - selected rural areas Selection MIZILO GARA - FENOARIVO DG12CFCIB1701 / Ciblage Component 1: Building a Consultant Enquête Enregistrement 2017-09- 2017-09- 2017-09- 2017-10- 2017-10- 2017-12- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,135.48 0.00 Canceled bénéficiaires nouvelles 07 07 23 14 27 26 selected rural areas Selection communes BETIOKY LOT 1 DG12CFCIB1702 / Ciblage Component 1: Building a Consultant Enquête Enregistrement 2017-09- 2017-09- 2017-09- 2017-10- 2017-10- 2017-12- IDA / 57080 safety net for the poor in Post Qualification Open - National 2,090.32 0.00 Canceled bénéficiaires nouvelles 07 07 23 14 17 16 selected rural areas Selection communes VOHIPENO LOT 2 DRT11CFPLAN17004 / Agence de planification Component 1: Building a Quality And chargée de suivi et de 2017-11- 2017-05- 2017-11- 2017-11- 2018-01- 2017-12- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-01- 2018-04- 2019-04- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 15,000.00 14,243.10 Signed supervision de chantier, 13 31 14 30 22 28 23 28 27 08 27 18 17 30 selected rural areas Selection suivi évaluation communautaire, mise à jour PAMO DRT11CFPLAN17005 / Agence de planification chargée du suivi et Component 1: Building a Quality And 2017-11- 2017-05- 2017-11- 2017-11- 2018-01- 2017-12- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-01- 2018-04- 2019-04- supervision des chantiers, IDA / 57080 safety net for the poor in Post Cost-Based Open - National 15,000.00 12,029.98 Signed 13 31 14 30 22 28 23 28 27 08 27 18 17 30 suivi évaluation selected rural areas Selection communautaire, mise à jour des PAMO DRT11CFPLAN17006 / Agence de planification chargée du suivi et Component 1: Building a Quality And 2017-11- 2017-05- 2017-11- 2017-11- 2018-01- 2017-12- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-01- 2019-04- supervision des chantiers, IDA / 57080 safety net for the poor in Post Cost-Based Open - National 15,000.00 0.00 Canceled 13 31 14 30 22 28 23 28 27 08 09 18 30 suivi évaluation selected rural areas Selection communautaire, mise à jour des PAMO Component 1: Building a Consultant DRT11CFSEN1701 / Agence 2017-11- 2017-11- 2017-12- 2018-01- 2018-01- 2019-05- IDA / 57080 safety net for the poor in Post Qualification Open - National 21,564.13 0.00 Canceled de sensibilisation 17 24 11 03 11 31 selected rural areas Selection DRA11CFSEN1701 / Component 1: Building a Consultant 2017-11- 2017-11- 2017-12- 2018-01- 2018-01- 2019-05- Agence de Sensibilisation IDA / 57080 safety net for the poor in Post Qualification Open - National 20,584.64 0.00 Canceled 17 24 11 03 11 31 ACTP Vatomandry selected rural areas Selection DRK11CFAGEC17001 / COLLECTE DE DONNÉES ET Component 1: Building a Quality And 2017-11- 2018-01- 2017-11- 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-03- 2018-01- 2018-04- 2020-01- 2019-08- ENCADREMENT UTB IDA / 57080 safety net for the poor in Post Cost-Based Open - National 64,516.13 30,964.76 Completed 28 03 29 18 05 08 20 12 07 16 18 21 13 21 21 FENOARIVO II ET MIZILO selected rural areas Selection GARA MANAKARA DRK11CFAGEC17002 / Component 1: Building a Quality And COLLECTE DE DONNÉES ET Under 2017-11- 2017-11- 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2020-01- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 32,258.06 0.00 ENCADREMENT UTB Implementation 28 29 18 08 12 16 21 21 selected rural areas Selection MAROFARIHY MANAKARA Component 1: Building a Quality And DRK12CFAGEC17001 / 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2020-02- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 4,356.33 0.00 Canceled MARCHE MULTIPLE 03 04 05 26 30 03 08 08 selected rural areas Selection Component 1: Building a Quality And DRK12CFAGEC17002 / 2017-12- 2017-12- 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2020-02- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 5,576.44 0.00 Canceled MARCHE MULTIPLE 03 04 05 26 30 03 08 08 selected rural areas Selection DRU11CFAGEC001 / ACTP Component 1: Building a Quality And 2017-11- 2017-10- 2017-12- 2017-12- 2017-11- 2018-01- 2017-11- 2018-01- 2017-12- 2018-01- 2018-02- 2018-01- 2018-03- 2020-01- Encadrement marché IDA / 57080 safety net for the poor in Post Cost-Based Open - National 14,696.97 11,730.49 Signed 29 25 14 20 13 10 28 13 01 23 06 30 09 30 multiples UTB 06 Antsoha selected rural areas Selection DRF11CFAGEC180001 / Component 1: Building a Quality And 2018-03- 2019-03- 2018-04- 2018-05- 2019-03- 2018-05- 2019-03- 2018-06- 2019-04- 2018-06- 2019-06- 2018-06- 2019-06- 2019-06- 2019-08- MARCHE MULTIPLE AGENCE IDA / 57080 safety net for the poor in Post Cost-Based Open - National 10,117.37 6,275.27 Completed 11 11 01 16 15 31 26 02 11 06 03 10 11 10 21 D'ENCADREMENT ACTP selected rural areas Selection DRF13PCAGEX18001 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 648.14 Completed ACT Post catastrophe FKT1 16 15 17 19 16 02 18 07 18 28 16 selected rural areas Selection - Ifanadiana DRF13PCAGEX18002 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT Post catastrophe FKT2 16 15 17 19 18 02 18 07 28 selected rural areas Selection - Ifanadiana DRF11CFSENS18001 / Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2019-02- AGENCE DE SENSIBILISATION IDA / 57080 safety net for the poor in Post Qualification Open - National 22,975.07 0.00 Canceled 16 17 24 12 19 19 ACTP ISANDRA selected rural areas Selection DRT13CFAGEX1801 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 362.71 Completed 17 11 17 17 12 02 15 07 15 28 27 post catastrophe dans le selected rural areas Selection Fokontany 1, Antananarivo Renivohitra DRT13CFAGEX1802 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 362.71 Completed 17 11 17 17 12 02 15 07 15 28 27 post catastrophe dans le selected rural areas Selection Fokontany 2, Antananarivo Renivohitra DRT13CFAGEX1803 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 362.71 Completed 17 11 17 17 12 02 15 07 15 28 27 post catastrophe dans le selected rural areas Selection Fokontany 3, Antananarivo Renivohitra DRA13CFAGEX18001 / LOT Component 1: Building a Consultant 1 ENCADREMENT - 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 16,591.05 1,741.78 Completed PAIEMENT ACT POST 17 14 17 17 15 02 16 07 17 28 19 selected rural areas Selection CATASTROPHE DES 04 FKT DIST BRICKAVILLE DRA13CFAGEX18002 / LOT Component 1: Building a Consultant 2 ENCADREMENT - 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- IDA / 57080 safety net for the poor in Post Qualification Open - National 12,442.25 1,189.19 Completed PAIEMENT ACT POST 17 14 17 17 14 02 16 07 17 28 06 selected rural areas Selection CATASTROPHE DES 04 FKT DIST TOAMASINA II DRA13CFAGEX18003 / LOT Component 1: Building a Consultant 3 ENCADREMENT - 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 16,589.67 1,577.47 Completed PAIEMENT ACT POST 17 14 17 17 14 02 16 07 17 28 19 selected rural areas Selection CATASTROPHE DES 04 FKT DIST TOAMASINA I DRA13CFAGEX18004 / LOT Component 1: Building a Consultant 4 ENCADREMENT - 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- IDA / 57080 safety net for the poor in Post Qualification Open - National 16,589.67 1,624.03 Completed PAIEMENT ACT POST 17 14 17 17 14 02 16 07 17 28 06 selected rural areas Selection CATASTROPHE DES 04 FKT DIST TOAMASINA I DRA13CFAGEX18005 / LOT Component 1: Building a Consultant 5 ENCADREMENT - 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- IDA / 57080 safety net for the poor in Post Qualification Open - National 16,589.67 1,561.19 Completed PAIEMENT ACT POST 17 14 17 17 15 02 16 07 17 28 07 selected rural areas Selection CATASTROPHE DES 04 FKT DIST TOAMASINA I DRA13CFAGEX18006 / LOT Component 1: Building a Consultant 6 ENCADREMENT - 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 12,442.25 1,197.21 Completed PAIEMENT ACT POST 17 14 17 17 15 02 16 07 17 28 15 selected rural areas Selection CATASTROPHE DES 03 FKT DIST TOAMASINA I DRA13CFAGEX18007 / LOT Component 1: Building a Consultant 7 ENCADREMENT - 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 12,442.25 1,217.56 Completed PAIEMENT ACT POST 17 14 17 17 15 02 16 07 17 28 15 selected rural areas Selection CATASTROPHE DES 03 FKT DIST TOAMASINA I DRT13CFAGEX1804 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 362.71 Completed 17 11 17 17 12 02 15 07 15 28 27 post catastrophe dans le selected rural areas Selection Fokontany 4, Antananarivo Renivohitra DRT13CFAGEX1805 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 366.91 Completed 17 11 17 17 12 02 15 07 15 28 28 post catastrophe dans le selected rural areas Selection Fokontany 5, Antananarivo Renivohitra DRT13CFAGEX1806 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 366.91 Completed 17 11 17 17 12 02 15 07 15 28 28 post catastrophe dans le selected rural areas Selection Fokontany 6, Antananarivo Renivohitra DRT13CFAGEX1807 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 373.05 Completed 17 11 17 17 12 02 15 07 15 28 28 post catastrophe dans le selected rural areas Selection Fokontany 7, Antananarivo Renivohitra DRT13CFAGEX1808 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 367.51 Completed 17 11 17 17 12 02 15 07 15 28 28 post catastrophe dans le selected rural areas Selection Fokontany 8, Antananarivo Renivohitra DRT13CFAGEX1809 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 380.35 Completed 17 11 17 17 12 02 15 07 15 28 30 post catastrophe dans le selected rural areas Selection Fokontany 9, Antananarivo Renivohitra DRT13CFAGEX1810 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 380.35 Completed 17 11 17 17 12 02 15 07 15 28 24 post catastrophe dans le selected rural areas Selection Fokontany 10, Antananarivo Renivohitra DRT13CFAGEX1811 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 380.35 Completed 17 11 17 17 12 02 15 07 15 28 30 post catastrophe dans le selected rural areas Selection Fokontany 1, Antananarivo Atsimondrano DRT13CFAGEX1812 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 380.35 Completed 17 11 17 17 12 02 15 07 15 28 30 post catastrophe dans le selected rural areas Selection Fokontany 2, Antananarivo Atsimondrano DRT13CFAGEX1813 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 374.26 Completed 17 11 17 17 12 02 15 07 15 28 18 post catastrophe dans le selected rural areas Selection Fokontany 3, Antananarivo Atsimondrano Page 6 DRT13CFAGEX1814 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 374.26 Completed 17 11 17 17 12 02 15 07 15 28 18 post catastrophe dans le selected rural areas Selection Fokontany 4, Antananarivo Atsimondrano DRT13CFAGEX1815 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 374.26 Completed 17 11 17 17 12 02 15 07 15 28 18 post catastrophe dans le selected rural areas Selection Fokontany 5, Antananarivo Atsimondrano DRT13CFAGEX1816 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 374.26 Completed 17 11 17 17 12 02 15 07 15 28 18 post catastrophe dans le selected rural areas Selection Fokontany 6, Antananarivo Atsimondrano DRT13CFAGEX1817 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 372.74 Completed 17 11 17 17 12 02 15 07 15 28 27 post catastrophe dans le selected rural areas Selection Fokontany 7, Antananarivo Atsimondrano DRT13CFAGEX1818 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 372.74 Completed 17 11 17 17 12 02 15 07 15 28 27 post catastrophe dans le selected rural areas Selection Fokontany 8, Antananarivo Atsimondrano DRT13CFAGEX1819 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 372.74 Completed 17 11 17 17 12 02 15 07 15 28 27 post catastrophe dans le selected rural areas Selection Fokontany 9, Antananarivo Atsimondrano DRT13CFAGEX1820 / Encadrement et paiement Component 1: Building a Consultant des bénéficiaires de l'ACT 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 372.90 Completed post catastrophe dans le 17 11 17 17 12 02 15 07 15 28 27 selected rural areas Selection Fokontany 10, Antananarivo Atsimondrano DRT13CFAGEX1821 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 402.86 Completed 17 11 17 17 12 02 15 07 15 28 16 post catastrophe dans le selected rural areas Selection Fokontany 1, Andasibe DRT13CFAGEX1822 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 402.86 Completed 17 11 17 17 12 02 15 07 15 28 16 post catastrophe dans le selected rural areas Selection Fokontany 1, Moramanga DRT13CFAGEX1823 / Encadrement et paiement Component 1: Building a Consultant 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 402.86 Completed 17 11 17 17 12 02 15 07 15 28 16 post catastrophe dans le selected rural areas Selection Fokontany 2, Moramanga DRK13CFAGEX18001 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT Under 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 ACT Post catastrophe FKT1 Implementation 19 19 19 04 09 20 selected rural areas Selection - MANAKARA DRK13CFAGEX18002 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT Post catastrophe FKT2 19 19 19 04 09 20 selected rural areas Selection - MANAKARA DRK13CFAGEX18003 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT Under 2018-01- 2017-02- 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 ACT Post catastrophe FKT3 Implementation 19 23 19 19 04 09 20 selected rural areas Selection - VOHIPENO DRK13CFAGEX18004 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT Post catastrophe FKT4 19 19 19 04 09 20 selected rural areas Selection - VOHIPENO DRK13CFAGEX18005 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT Under 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 ACT Post catastrophe FKT5 Implementation 19 19 19 04 09 20 selected rural areas Selection - MANANJARY DRK13CFAGEX18006 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-02- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT Post catastrophe FKT6 19 19 19 04 09 20 selected rural areas Selection - MANANJARY Component 2: DG20CFFEXC1801 / Consultant Strengthening safety net 2018-02- 2018-03- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- Formation en Excel avancé IDA / 57080 Post Qualification Open - National 1,109.25 0.00 Canceled administration, monitoring 01 28 06 24 27 02 17 DRS Selection and social accountability Component 2: DG20CFFEXC1802 / Consultant Strengthening safety net 2018-02- 2018-03- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- Formation en Excel avancé IDA / 57080 Post Qualification Open - National 1,109.25 0.00 Canceled administration, monitoring 01 28 06 24 27 02 17 DRA Selection and social accountability Component 2: DG20CFFEXC1803 / Consultant Strengthening safety net 2018-02- 2018-03- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- Formation en excel avancé IDA / 57080 Post Qualification Open - National 1,109.25 0.00 Canceled administration, monitoring 01 28 06 24 27 02 03 DRT et DG Selection and social accountability Component 2: DG20CFFEXC1804 / Consultant Strengthening safety net 2018-02- 2018-03- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- Formation en excel avancé IDA / 57080 Post Qualification Open - National 1,109.25 0.00 Canceled administration, monitoring 01 28 06 24 27 02 17 DRF Selection and social accountability Component 2: DG20CFFEXC1805 / Consultant Strengthening safety net 2018-02- 2018-03- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- Formation en excel avancé IDA / 57080 Post Qualification Open - National 1,109.25 0.00 Canceled administration, monitoring 01 28 06 24 27 02 17 DRK Selection and social accountability Component 2: DG20CFFEXC1806 / Consultant Strengthening safety net 2018-02- 2018-03- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- Formation en excel avancé IDA / 57080 Post Qualification Open - National 1,109.25 0.00 Canceled administration, monitoring 01 28 06 24 27 02 17 DRU Selection and social accountability Component 2: DG20CFFEXC1807 / Consultant Strengthening safety net 2018-02- 2018-03- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- Formation en excel avancé IDA / 57080 Post Qualification Open - National 1,109.25 0.00 Canceled administration, monitoring 01 28 06 24 27 02 17 DRP Selection and social accountability Component 2: DG20CFFPORT1809 / Consultant Strengthening safety net 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-03- 2018-04- Formation en gestion de IDA / 57080 Post Qualification Open - National 9,317.73 0.00 Canceled administration, monitoring 07 28 12 06 09 14 13 portefeuille d'activitées Selection and social accountability DG20CFRECDG1811 / Component 2: Quality And CABINET EN CHARGE DU Strengthening safety net 2018-01- 2017-09- 2018-01- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- 2018-03- 2018-02- 2018-04- 2018-03- 2018-06- 2018-04- 2018-12- IDA / 57080 Post Cost-Based Open - National 2,580.65 1,661.18 Completed RECRUTEMENT D'UN administration, monitoring 30 19 30 30 08 30 09 01 14 16 10 02 07 01 05 Selection DIRECTEUR GENERAL and social accountability DRT13CFAGEX1824 / Encadrement et paiement Component 1: Building a Consultant 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 364.53 Completed 27 23 27 28 26 03 02 10 02 31 16 post cata dans le Fokontany selected rural areas Selection 1 à Antananarivo Atsimondrano DRT13CFAGEX1825 / Encadrement et paiement Component 1: Building a Consultant 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- des bénéficiaires de l'ACT IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 364.53 Completed 27 23 27 28 26 03 02 10 02 31 16 post cata dans le Fokontany selected rural areas Selection 2 à Antananarivo Atsimondrano DRF13PCAGEX18003 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2018-03- 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 3,987.72 Completed ACT Post Catastrophe FKT 8 28 22 28 01 27 04 27 10 28 31 23 selected rural areas Selection AMBALAVAO DRF13PCAGEX18004 / Component 1: Building a Consultant ENCADREMENT -PAIEMENT 2018-02- 2018-02- 2018-03- 2018-03- 2018-03- 2018-03- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT Post Catastrophe FKT 9 28 28 01 04 10 31 selected rural areas Selection Ambalavao DG13CFAGEX1801 / Component 1: Building a Consultant ENCADREMENT PAIEMENT 2018-03- 2018-02- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-09- IDA / 57080 safety net for the poor in Post Qualification Open - National 12,442.26 1,149.03 Signed ACT POST CATASTROPHE 3 01 23 02 07 28 08 05 10 08 06 selected rural areas Selection COMMUNES MAHAJANGA DRK11CFSECCS1701 / Suivi- Evaluation Communautaire,Mis à jour PAMO, côntrole et suivi UTB VATANA-MITANTY OUEST- VOHIBOATAVO- Component 1: Building a Quality And Under 2017-08- 2017-08- 2017-08- 2017-09- 2017-10- 2017-10- 2017-10- 2017-10- 2020-04- AMBALAROKA- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 34,193.54 0.00 Implementation 21 22 22 10 08 12 19 29 16 AMBOHITROVA- selected rural areas Selection MAROFARIHY-MIZILO GARA- FENOARIVO-VOHILAVA- AMBOHIMANARIVO MANGAIKA- SAHANABOHITRA- AMBORONDRA-ONILAHY FENOMBY-BENIHAONANA DRK13CFAGEX18007 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT Under 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 ACT Post Catastrophe FKT6 Implementation 01 01 01 17 22 02 selected rural areas Selection - Farafangana DRK13CFAGEX18008 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT Post catastrophe FKT7 01 01 01 17 22 02 selected rural areas Selection - Farafangana DRK13CFAGEX18009 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT Under 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 ACT Post catastrophe FKT8 Implementation 01 01 01 17 22 02 selected rural areas Selection - Vangaindrano DRK13CFAGEX18010 / Component 1: Building a Consultant ENCADREMENT - PAIEMENT 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT Post catastrophe FKT9 01 01 01 17 22 02 selected rural areas Selection - Vangaindrano DRA11CFAGEC18001 / REPRISE ENCADREMENT Component 1: Building a Quality And 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- 2018-03- 2018-04- 2018-03- 2018-04- 2018-04- 2018-04- 2018-05- 2019-06- ACTP UTB TANAMBAO IDA / 57080 safety net for the poor in Post Cost-Based Open - National 16,569.33 8,508.26 Signed 04 02 04 05 06 02 28 03 28 08 10 14 07 30 VAHATRAKAKA- LOT 7 - selected rural areas Selection DISTRICT VATOMANDRY DRA11CFAGEC18002 / Component 1: Building a Quality And REPRISE ENCADREMENT 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- 2018-03- 2018-04- 2018-03- 2018-04- 2018-04- 2018-04- 2018-05- 2019-06- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 17,442.67 10,451.31 Signed ACTP UTB SAHAMATEVINA - 04 02 04 05 06 02 28 03 28 08 10 14 07 30 selected rural areas Selection LOT 3 - DISTRICT VATOMANDRY DRA11CFAGEC18003 / REPRISE ENCADREMENT Component 1: Building a Quality And 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- 2018-03- 2018-04- 2018-03- 2018-04- 2018-04- 2018-04- 2018-05- 2019-06- ACTP UTB AMPANALANA - IDA / 57080 safety net for the poor in Post Cost-Based Open - National 28,899.30 14,286.57 Signed 04 02 04 05 06 02 28 03 28 08 10 15 07 30 UTB AMBALAVOLO - LOT 4 selected rural areas Selection - DISTRICT VATOMANDRY DG13CFAGEX1802 / Component 1: Building a Consultant ENCADREMENT PAIEMENT 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT POST CATASTROPHE 15 16 21 22 24 23 selected rural areas Selection ANKATAFAHELY CU AMBANJA DG13CFAGEX1803 / Component 1: Building a Consultant ENCADREMENT PAIEMENT 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT POST CATA TANAMBAO 15 16 21 22 24 23 selected rural areas Selection V CU AMBANJA DG13CFAGEX1804 / Component 1: Building a Consultant ENCADREMENT PAIEMENT 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 1,532.04 Signed ACT POST CATA BEGAVO I 15 16 16 21 20 22 20 24 20 23 selected rural areas Selection CU AMBANJA DG13CFAGEX1805 / Component 1: Building a Consultant ENCADREMENT PAIEMENT 2018-03- 2018-03- 2018-03- 2018-03- 2018-03- 2018-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 4,147.42 0.00 Canceled ACT POST CATA BEGAVO II 15 16 21 22 24 23 selected rural areas Selection CU AMBANJA DRP81CFAGEE18001 / Component 1: Building a Consultant 2018-04- 2018-01- 2018-04- 2018-04- 2018-01- 2018-05- 2018-01- 2018-05- 2018-03- 2019-12- ENCADREMENT REPRISE IDA / D1450 safety net for the poor in Post Qualification Open - National 43,932.00 36,059.11 Signed 25 19 25 25 19 02 20 03 06 31 AGEE TMNC TRANOVAHO selected rural areas Selection BELOHA DRU11CFAGSEN18001 / Component 1: Building a Consultant ACT-P Agence de 2018-04- 2018-05- 2018-06- 2018-07- 2018-07- 2019-12- IDA / 57080 safety net for the poor in Post Qualification Open - National 9,600.00 0.00 Canceled Sensibilisation des UTB dans 28 01 03 06 19 31 selected rural areas Selection le district d'Ankazoabo ARA13CFMO17001 / Component 1: Building a Maîtrise d'œuvre CEG Least Cost 2017-05- 2017-07- 2017-05- 2017-05- 2017-07- 2017-06- 2017-07- 2017-06- 2017-07- 2017-06- 2017-07- 2017-06- 2017-08- 2018-09- IDA / 57080 safety net for the poor in Post Open - National 2,593.10 15,402.99 Signed BELAOKA LOKOHO - CR Selection 24 13 24 25 13 09 24 10 26 14 28 23 03 23 selected rural areas BELAOKA LOKOHO - ANDAPA ARA13CFMO17002 / Component 1: Building a maîtrise d'œuvre travaux Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- IDA / 57080 safety net for the poor in Post Open - National 2,593.10 0.00 Canceled EPP SARAHANDRANO - CR Selection 24 24 25 09 10 14 23 23 selected rural areas AMBODIAMPANA - SAMBAVA ARA13CFMO17003 / Component 1: Building a maîtrise d'œuvre EPP Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- IDA / 57080 safety net for the poor in Post Open - National 2,593.10 0.00 Canceled MAHITSIARONGANA - CR Selection 24 24 25 09 10 14 23 23 selected rural areas AMBODIVOARA - SAMBAVA ARA13CFMO17004 / Component 1: Building a Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- maîtrise d'œuvre EPP IDA / 57080 safety net for the poor in Post Open - National 2,593.10 0.00 Canceled Selection 24 24 25 09 10 14 23 23 ANKORABE - CR selected rural areas AMBOHIMALAZA - SAMBAVA ARA13CFMO17005 / Component 1: Building a maîtrise d'œuvre EPP Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- IDA / 57080 safety net for the poor in Post Open - National 2,593.10 0.00 Canceled AMPAMPAMENA I - CR Selection 24 24 25 09 10 14 23 23 selected rural areas ANDRATAMARINA - SAMBAVA ARA13CFMO17006 / maîtrise d'œuvre ECOLE Component 1: Building a Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- COMMUNAUTAIRE IDA / 57080 safety net for the poor in Post Open - National 2,593.10 0.00 Canceled Selection 24 24 25 09 10 14 23 23 ANDALAMAHITSY - CR selected rural areas ANTSIRABE NORD - VOHEMAR ARA13CFMO17007 / Component 1: Building a maîtrise d'œuvre ECOLE Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- IDA / 57080 safety net for the poor in Post Open - National 2,593.10 0.00 Canceled COMMUNAUTAIRE Selection 24 24 25 09 10 14 23 23 selected rural areas NOSIMBARY - CR TSARABARIA - VOHEMAR ARA13CFMO17008 / Component 1: Building a Least Cost 2017-05- 2017-06- 2017-05- 2017-05- 2017-06- 2017-06- 2017-07- 2017-06- 2017-06- 2017-06- 2017-07- 2017-06- 2017-07- 2018-09- maîtrise d'œuvre EPP IDA / 57080 safety net for the poor in Post Open - National 3,806.90 17,180.60 Signed Selection 24 28 24 25 28 09 07 10 28 14 10 23 26 23 SAHAMAZAVA - CU ANDAPA selected rural areas - ANDAPA ARA13CFMO17009 / Component 1: Building a Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- maîtrise d'œuvre CEG IDA / 57080 safety net for the poor in Post Open - National 3,806.90 0.00 Canceled Selection 24 24 25 09 10 14 23 23 AMPAHANA - CR selected rural areas AMPAHANA - ANTALAHA ARA13CFMO17010 / Component 1: Building a Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- maîtrise d'œuvre CEG IDA / 57080 safety net for the poor in Post Open - National 4,146.55 0.00 Canceled Selection 24 24 25 09 10 14 23 23 MAHERIFODY - CU selected rural areas ANTALAHA - ANTALAHA ARA13CFMO17011 / Component 1: Building a Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- maîtrise d'œuvre EPP IDA / 57080 safety net for the poor in Post Open - National 4,064.48 0.00 Canceled Selection 24 24 25 09 10 14 23 23 AMBATOFISAKA - CU selected rural areas ANTALAHA - ANTALAHA ARA13CFMO17012 / Component 1: Building a maîtrise d'œuvre CSB Least Cost 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2018-09- IDA / 57080 safety net for the poor in Post Open - National 3,791.38 0.00 Canceled AMBINANIFAHO - CR Selection 24 24 25 09 10 14 23 23 selected rural areas AMBINANIFAHO - ANTALAHA DRK11CFAGSEN18001 / Component 1: Building a Quality And 2018-04- 2018-04- 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2020-01- ACTP Agence de IDA / 57080 safety net for the poor in Post Cost-Based Open - National 26,758.24 0.00 Canceled 30 30 21 05 08 14 27 23 sensibilisation district selected rural areas Selection Manakara DRK11CFAGEC18001 / COLLECTE DE DONNEES ET Component 1: Building a Quality And ENCADREMENT UTB Pending 2018-06- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2019-01- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 57,096.77 0.00 AMBOHIMANARIVO Implementation 05 06 25 16 20 24 29 05 selected rural areas Selection MANGAIKA- UTB VATANA - UTB VOHILAVA DRK13CFMO18001 / Component 1: Building a MAÎTRISE D' OEUVRE Least Cost Pending 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-12- IDA / 57080 safety net for the poor in Post Open - National 4,843.75 0.00 TRAVAUX DE Selection Implementation 05 05 15 30 01 04 11 08 selected rural areas RÉHABILITATION D' UN ECOLE A VOHIPENO DRF13CFMO18001 / MAITRISE D'OEUVRE POUR Component 1: Building a Quality And 2018-06- 2018-07- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2018-11- 2019-08- LA RECONSTRUCTION DES IDA / 57080 safety net for the poor in Post Cost-Based Open - National 4,750.00 3,706.50 Completed 06 03 11 27 11 12 18 13 18 23 24 30 30 27 26 ECOLES DISTRICT selected rural areas Selection AMBOHIMAHASOA DRT13CFMO18001 / Maîtrise d'œuvre des Component 1: Building a Consultant 2018-06- 2018-08- 2018-06- 2018-06- 2018-08- 2018-06- 2018-09- 2018-07- 2018-09- 2019-12- 2019-09- travaux de IDA / 57080 safety net for the poor in Post Qualification Open - National 2,580.65 2,323.92 Completed 12 13 12 18 23 29 04 05 11 13 25 réhabilitation/reconstructio selected rural areas Selection n d'une école dans le District d'Arivonimamo DRT13CFMO18002 / Maîtrise d'œuvre des Component 1: Building a Consultant 2018-06- 2018-08- 2018-06- 2018-06- 2018-08- 2018-06- 2018-09- 2018-07- 2018-09- 2019-12- 2019-09- travaux de IDA / 57080 safety net for the poor in Post Qualification Open - National 2,580.65 2,323.92 Completed 12 13 12 18 23 29 04 05 11 13 25 réhabilitation/reconstructio selected rural areas Selection n d'une école dans le District de Faratsiho Component 2: DG20CFFORMGRH1814 / Consultant Strengthening safety net 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- FORMATION EN GESTION IDA / 57080 Post Qualification Open - National 745.00 0.00 Canceled administration, monitoring 10 13 07 22 29 28 DES RESSOURCES HUMAINES Selection and social accountability Page 7 Component 2: DG20CFFORMFINPUB1815 / Consultant Strengthening safety net 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- FORMATION EN FINANCE IDA / 57080 Post Qualification Open - National 745.00 0.00 Canceled administration, monitoring 10 13 07 22 29 28 PUBLIQUE Selection and social accountability DG11CFENQML1818 / Component 1: Building a Consultant 2018-06- 2018-07- 2018-06- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-09- 2018-08- 2019-01- ENQUETE EMPLOI DU TEMPS IDA / 57080 safety net for the poor in Post Qualification Open - National 10,000.00 9,331.43 Completed 11 05 14 27 03 07 11 12 19 11 07 DES MERES LEADERS selected rural areas Selection DG20CFAUDTMNC1819 / Investigation au niveau des sites du Programme de Transfert Monétaire aux Component 1: Building a Consultant 2018-07- 2018-08- 2018-07- 2018-07- 2018-09- 2018-08- 2018-10- 2018-08- 2018-11- 2018-09- bénéficiaires de filets de IDA / D1450 safety net for the poor in Post Qualification Open - National 30,000.00 4,159.19 Signed 11 09 12 30 14 09 19 15 27 14 sécurités sociaux du FID selected rural areas Selection dans le Districts d'Ambovombe, Amboasary Atsimo, Bekily, Beloha et Tsihombe DG20CFEVALPERS1821 / Component 2: Consultant Acquisition Logiciel Strengthening safety net 2018-08- 2018-08- 2018-09- 2018-09- 2018-09- 2019-09- IDA / 57080 Post Qualification Open - National 6,100.00 0.00 Canceled d'évaluation du personnel administration, monitoring 12 17 01 16 20 20 Selection en ligne and social accountability DRU13CFAGEX19001 / ENCADREMENT ET SUPERVISION DE MICRO- Component 1: Building a Quality And 2019-02- 2019-01- 2019-02- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- PROJET 1 A HAUTE IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 620.08 Completed 04 24 05 06 27 08 27 08 28 10 28 10 28 12 14 INTENSITE DE MAIN- selected rural areas Selection D'ŒUVRE ACTP PC FKT ANKIEMBE HAUT MAHAVATSE 1er DRUI3CFAGEX19002 / ENCADREMENT ET SUPERVISION DE MICRO- Component 1: Building a Quality And PROJET 2 A HAUTE 2019-02- 2019-01- 2019-02- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 692.05 Completed INTENSITE DE MAIN- 04 24 05 06 27 08 27 08 28 10 28 10 28 12 14 selected rural areas Selection D'ŒUVRE ACT PC FKT ANKIEMBE HAUT- TANAMBAO MOTOMBE MAHAVATSE 1er DRU13CFAGEX19003 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DE MICRO- 2019-02- 2019-01- 2019-02- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 678.21 Completed PROJET A HAUTE INTENSITE 04 24 05 06 27 08 27 08 28 10 28 10 28 12 14 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT ANKIEMBE BAS DRU13CFAGEX19004 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-01- 2019-02- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 610.20 Completed PROJETS A HAUTE INTENSITE 04 24 05 06 27 08 27 08 28 10 28 10 28 12 27 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC MAHAVATSE II OUEST DRU13CFAGEX19005 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-01- 2019-02- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-03- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 610.20 Completed PROJETS A HAUTE INTENSITE 04 24 05 06 27 08 27 08 28 10 28 10 28 12 27 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT MAHAVATSE II EST DG20CFCABRECR1901 / Component 2: RECRUTEMENT DU CHEF DE Consultant Strengthening safety net 2019-02- 2019-02- 2019-02- 2019-02- 2019-04- 2019-03- 2019-06- 2019-03- 2019-06- 2019-12- SERVICE DES RESSOURCES IDA / 57080 Post Qualification Open - National 3,000.00 2,280.43 Signed administration, monitoring 07 21 12 25 05 18 06 23 06 31 HUMAINES ET AUTRE Selection and social accountability PERSONNEL DU FID DG20CFMANUEL1902 / Component 2: Quality And Élaboration manuel mesures Strengthening safety net 2019-02- 2019-02- 2019-03- 2019-04- 2019-04- 2019-04- 2019-05- 2019-06- IDA / 57080 Post Cost-Based Open - National 30,000.00 0.00 Canceled d'accompagnement et administration, monitoring 07 28 13 10 15 23 01 15 Selection révision différents manuels and social accountability du FID DG20CFPLAT1903 / Component 2: CONCEPTION ET MISE EN Strengthening safety net Quality Based 2019-02- 2019-03- 2019-03- 2019-04- 2019-05- 2019-05- 2019-05- 2020-09- IDA / 57080 Post Open - National 150,000.00 0.00 Canceled PLACE D'UNE PLATEFORME administration, monitoring Selection 28 05 31 28 03 06 16 14 DE COLLECTE DE DONNEES and social accountability DRA13CFAGEX19001 / LOT Component 1: Building a Consultant 1 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 1,990.66 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 11 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19002 / LOT Component 1: Building a Consultant 2 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 2,010.49 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 11 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19003 / LOT Component 1: Building a Consultant 3 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 1,893.42 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 11 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19004 / LOT Component 1: Building a Consultant 4 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 2,062.47 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 11 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19005 / LOT Component 1: Building a Consultant 5 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 2,094.54 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 11 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19006 / LOT Component 1: Building a Consultant 6 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 2,008.28 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 13 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19007 / LOT Component 1: Building a Consultant 7 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 2,019.34 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 12 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19008 / LOT Component 1: Building a Consultant 8 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 2,006.07 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 11 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19009 / LOT Component 1: Building a Consultant 9 ENCADREMENT - 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-05- IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 2,647.50 Completed PAIEMENT ACT POST 20 26 20 25 26 05 26 10 27 26 25 selected rural areas Selection CATASTROPHE DES 08 FKT DIST TOAMASINA I DRA13CFAGEX19010 / LOT 10 ENCADREMENT - Component 1: Building a Consultant 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- PAIEMENT ACT POST IDA / 57080 safety net for the poor in Post Qualification Open - National 26,269.47 2,008.28 Completed 20 26 20 25 26 05 26 10 27 26 13 CATASTROPHE DES 08 FKT selected rural areas Selection DIST TOAMASINA I DRA13CFAGEX19011 / LOT 11 ENCADREMENT - Component 1: Building a Consultant 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- PAIEMENT ACT POST IDA / 57080 safety net for the poor in Post Qualification Open - National 29,553.16 2,474.54 Completed 20 26 20 25 26 05 26 10 27 26 11 CATASTROPHE DES 09 FKT selected rural areas Selection DIST TOAMASINA I DRA13CFAGEX19012 / LOT 12 ENCADREMENT - Component 1: Building a Consultant 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- PAIEMENT ACT POST IDA / 57080 safety net for the poor in Post Qualification Open - National 29,553.16 2,196.63 Completed 20 26 20 25 26 05 26 10 27 26 11 CATASTROPHE DES 09 FKT selected rural areas Selection DIST TOAMASINA I DRA13CFAGEX19013 / LOT 13 ENCADREMENT - Component 1: Building a Consultant 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- PAIEMENT ACT POST IDA / 57080 safety net for the poor in Post Qualification Open - National 29,553.16 2,238.08 Completed 20 26 20 25 26 05 26 10 27 26 12 CATASTROPHE DES 09 FKT selected rural areas Selection DIST TOAMASINA I DRA13CFAGEX19014 / LOT 14 ENCADREMENT - Component 1: Building a Consultant 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- PAIEMENT ACT POST IDA / 57080 safety net for the poor in Post Qualification Open - National 29,553.16 2,218.13 Completed 20 26 20 25 26 05 26 10 27 26 11 CATASTROPHE DES 09 FKT selected rural areas Selection DIST TOAMASINA I DRF13PCMO19001 / MAITRISE D'OEUVRE POUR Component 1: Building a LA RECONSTRUCTION D'UNE Least Cost 2019-05- 2019-05- 2019-05- 2019-07- 2019-05- 2019-08- 2019-06- 2019-09- 2019-06- 2019-10- 2019-06- 2019-11- 2019-06- 2020-01- 2019-09- IDA / 57080 safety net for the poor in Post Open - National 2,352.94 2,464.11 Completed ECOLE DANS LE Selection 08 08 23 06 29 03 11 02 12 07 13 11 20 10 27 selected rural areas FOKONTANY ANKAZOTANA CR AMBOHIMANANA DRT13CFAGEX1901 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany Avaradoha, 08 08 08 10 08 28 10 04 15 17 09 selected rural areas Selection Commune ANTANANARIVO RENIVOHITRA, District ANTANANARIVO III DRT13CFAGEX1904 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany 08 08 08 10 08 28 10 04 15 17 09 selected rural areas Selection d'Andravoahangy, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO III DRT13CFAGEX1903 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany Ankorondrano 08 08 08 10 08 28 10 04 15 17 09 selected rural areas Selection Est, Commune ANTANANARIVO RENIVOHITRA, District ANTANANARIVO III DRT13CFAGEX1902 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany Besarety, 08 08 08 10 08 28 10 04 15 17 09 selected rural areas Selection Commune ANTANANARIVO RENIVOHITRA, District ANTANANARIVO III DRT13CFAGEX1912 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany d'Androndrakely, 08 08 08 10 08 28 10 04 15 17 03 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO II DRT13CFAGEX1913 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany de Tsiadana, 08 08 08 10 08 28 10 04 15 17 03 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO II DRT13CFAGEX1914 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany de Mandroseza, 08 08 08 10 08 28 10 04 15 17 03 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO II DRT13CFAGEX1905 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany d'Ankorondrano 08 08 08 10 08 28 10 04 15 17 09 selected rural areas Selection Ouest, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO III DRT13CFAGEX1906 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany 08 08 08 10 08 28 10 04 15 17 15 selected rural areas Selection d'Andranomanalina Isotry , Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO I DRT13CFAGEX1907 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany Andohatapenaka 08 08 08 10 08 28 10 04 15 17 15 selected rural areas Selection II, Commune ANTANANARIVO RENIVOHITRA, District ANTANANARIVO I DRT13CFAGEX1908 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany d'Andavamamba 08 08 08 10 08 28 10 04 15 17 15 selected rural areas Selection Anatihazo I , Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO I DRT13CFAGEX1909 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany 08 08 08 10 08 28 10 04 15 17 15 selected rural areas Selection Antetezanafovoany I, Commune ANTANANARIVO RENIVOHITRA, District ANTANANARIVO I DRT13CFAGEX1910 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 244.53 Completed Fokontany 08 08 08 10 08 28 10 04 15 17 15 selected rural areas Selection d'Antohomadinika sud, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO I DRT13CFAGEX1911 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-07- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany Ambohipotsy, 08 08 08 10 08 28 10 04 15 17 03 selected rural areas Selection Commune ANTANANARIVO RENIVOHITRA, District ANTANANARIVO II DRT13CFAGEX1927 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany d'Andranomena, 08 08 08 10 08 28 10 04 15 17 05 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO VI DRT13CFAGEX1933 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 276.47 Completed 08 08 08 10 10 28 10 04 03 17 09 Fokontany d'Antanetibe , selected rural areas Selection Commune d'Ambohitrimanjaka, District d'AMBOHIDRATRIMO DRT13CFAGEX1934 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 276.47 Completed 08 08 08 10 08 28 10 04 03 17 09 Fokontany de Lavahitsiny, selected rural areas Selection Commune d'Anosiala, District d'AMBOHIDRATRIMO DRT13CFAGEX1938 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed 08 08 08 10 08 28 10 04 03 17 08 Fokontany de Manankasina, selected rural areas Selection Commune d'Ambohitrimanjaka, District d'AMBOHIDRATRIMO DRT13CFAGEX1943 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 300.06 Completed 08 08 08 10 08 28 10 04 03 17 15 Fokontany de Fihaonana selected rural areas Selection ville, Commune de Fihaonana, District d'ANKAZOBE DRT13CFAGEX1946 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany 08 08 08 10 08 28 10 04 03 17 16 selected rural areas Selection d'Ambohimanatrika, Commune de Soavina, District d'ANTANANARIVO ATSIMONDRANO DRT13CFAGEX1947 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany de Tongarivo, 08 08 08 10 08 28 10 04 03 17 16 selected rural areas Selection Commune de Tanjombato, District d'ANTANANARIVO ATSIMONDRANO DRT13CFAGEX1948 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany d'Amboatavo, 08 08 08 10 08 28 08 04 03 17 16 selected rural areas Selection Commune d'Ambavahaditokana, District d'ANTANANARIVO ATSIMONDRANO Page 8 DRT13CFAGEX1949 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany d'Anosimasina, 08 08 08 10 08 28 08 04 03 17 16 selected rural areas Selection Commune de Bemasoandro, District d'ANTANANARIVO ATSIMONDRANO DRT13CFAGEX1950 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany de Namehana, 08 08 08 10 08 28 10 04 03 17 12 selected rural areas Selection Commune de Sabotsy Namehana, District d'ANTANANARIVO AVARADRANO DRT13CFAGEX1951 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany de Manaritsoa, 08 08 08 10 08 28 10 04 03 17 12 selected rural areas Selection Commune de Sabotsy Namehana, District d'ANTANANARIVO AVARADRANO DRT13CFAGEX1956 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 346.40 Completed 08 08 08 10 08 28 10 04 15 17 05 Fokontany de Marohisana, selected rural areas Selection Commune d'AMBOHIPIHAONANA, District d'AMBATOLAMPY, DRT13CFAGEX1957 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 346.40 Completed 08 08 08 10 08 28 10 04 15 17 05 Fokontany de Fihaonana, selected rural areas Selection Commune d'ANDRAVOLA VOHIPENO, District d'AMBATOLAMPY DRT13CFAGEX1958 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 271.58 Completed 08 08 08 10 08 28 10 04 15 17 10 Fokontany d'Antobiniaro, selected rural areas Selection Commune d'ANTANIFOTSY, District d'ANTANIFOTSY DRT13CFAGEX1959 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 271.58 Completed Fokontany 08 08 08 10 08 28 10 04 15 17 10 selected rural areas Selection d'Ambohimandroso A, Commune d'AMBOHIMANDROSO, District d'ANTANIFOTSY DRT13CFAGEX1960 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 327.20 Completed 08 08 08 10 08 28 10 04 15 17 12 Fokontany de Tsarafara selected rural areas Selection Andranobe, Commune d'ANTSIRABE, District d'ANTSIRABE I DRT13CFAGEX1915 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany Ambolokandrina, 08 08 08 10 08 28 10 04 15 17 03 selected rural areas Selection Commune ANTANANARIVO RENIVOHITRA, District ANTANANARIVO II DRT13CFAGEX1916 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 254.35 Completed Fokontany d'Anosipatrana 08 08 08 10 08 28 10 04 15 17 08 selected rural areas Selection Ouest, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO IV DRT13CFAGEX1917 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 254.35 Completed Fokontany de 08 08 08 10 08 28 10 04 15 17 08 selected rural areas Selection Mandrangobato II, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO IV DRT13CFAGEX1918 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 254.35 Completed Fokontany d'Ivolaniray, 08 08 08 10 08 28 10 04 15 17 08 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO IV DRT13CFAGEX1919 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 254.35 Completed Fokontany d'Anosibe II, 08 08 08 10 08 28 10 04 15 17 08 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO IV DRT13CFAGEX1920 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 254.35 Completed Fokontany d'Ampefiloha 08 08 08 10 08 28 10 04 15 17 08 selected rural areas Selection Ambodirano, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO IV DRT13CFAGEX1921 / Encadrement et paiement des bénéficiaires de l'ACT post catastrophe dans le Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- Fokontany Ambohidahy IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 262.65 Completed 08 08 08 10 08 28 10 04 15 17 12 Ankadindramamy, selected rural areas Selection Commune ANTANANARIVO RENIVOHITRA, District ANTANANARIVO V DRT13CFAGEX1922 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 262.65 Completed Fokontany d'Ankerana, 08 08 08 10 08 28 10 04 15 17 12 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO V DRT13CFAGEX1923 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 262.65 Completed Fokontany de 08 08 08 10 08 28 10 04 15 17 12 selected rural areas Selection Soavimasoandro, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO V DRT13CFAGEX1924 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 262.65 Completed Fokontany de Manjakaray, 08 08 08 10 08 28 10 04 15 17 12 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO V DRT13CFAGEX1925 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 262.65 Completed Fokontany d'Anjanahary II 08 08 08 10 08 28 08 04 15 17 12 selected rural areas Selection O, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO V DRT13CFAGEX1926 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany 08 08 08 10 08 28 10 04 15 17 05 selected rural areas Selection d'Ambonivoninkely, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO VI DRT13CFAGEX1928 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany d'Ambatolampy, 08 08 08 10 08 28 10 04 15 17 05 selected rural areas Selection Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO VI DRT13CFAGEX1929 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany 08 08 08 10 08 28 10 04 15 17 05 selected rural areas Selection d'Ambohimiadana Nord, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO VI DRT13CFAGEX1930 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 248.82 Completed Fokontany d'Antanety 08 08 08 10 08 28 10 04 15 17 05 selected rural areas Selection Avaratra, Commune d'ANTANANARIVO RENIVOHITRA, District d'ANTANANARIVO VI DRT13CFAGEX1931 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 276.47 Completed 08 08 08 10 08 28 10 04 03 17 09 Fokontany d'Ambohinambo, selected rural areas Selection Commune de Talatamaty, District d'AMBOHIDRATRIMO DRT13CFAGEX1963 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 267.22 Completed 08 08 08 10 08 28 10 04 15 17 10 Fokontany d'Ambano, selected rural areas Selection Commune d'AMBANO, District d'ANTSIRABE II DRT13CFAGEX1964 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 340.84 Completed 08 08 08 10 08 28 10 04 15 17 05 Fokontany d'Ambohibary selected rural areas Selection Iray Tsimivaky, Commune d'AMBOHIBARY, District d'ANTSIRABE II DRT13CFAGEX1965 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 267.22 Completed 08 08 08 10 08 28 10 04 15 17 10 Fokontany de Betafo Centre selected rural areas Selection ville, Commune de BETAFO, District de BETAFO DRT13CFAGEX1966 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 267.22 Completed 08 08 08 10 08 28 10 04 15 17 10 Fokontany de Belanitra, selected rural areas Selection Commune d'AMBOHIMASINA, District de BETAFO DRT13CFAGEX1967 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 340.84 Completed 08 08 08 10 08 28 10 04 15 17 05 Fokontany de Faratsiho selected rural areas Selection centre, Commune de FARATSIHO, District de FARATSIHO DRT13CFAGEX1968 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 340.84 Completed 08 08 08 10 08 28 10 04 15 17 05 Fokontany de Manarintsoa, selected rural areas Selection Commune de MIANDRARIVO, District de FARATSIHO DRT13CFAGEX1969 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 327.20 Completed 08 08 08 10 08 28 10 04 15 17 12 Fokontany de Fidirana, selected rural areas Selection Commune de FIDIRANA, District de MANDOTO DRT13CFAGEX1970 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 327.20 Completed 08 08 08 10 08 28 10 04 15 17 12 Fokontany selected rural areas Selection d'Ankazomiriotra, Commune d'ANKAZOMIRIOTRA, District de MANDOTO DRT13CFAGEX1932 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 276.47 Completed 08 08 08 10 08 28 10 04 03 17 09 Fokontany de Faralaza, selected rural areas Selection Commune de Talatamaty, District d'AMBOHIDRATRIMO DRT13CFAGEX1935 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed 08 08 08 10 08 28 10 04 03 17 08 Fokontany de Mandrosoa, selected rural areas Selection Commune d'Anosiala, District d'AMBOHIDRATRIMO DRT13CFAGEX1936 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed 08 08 08 10 08 28 10 04 03 17 08 Fokontany selected rural areas Selection d'Ankadindravola, Commune d'Ivato , District d'AMBOHIDRATRIMO DRT13CFAGEX1937 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed 08 08 08 10 08 28 10 04 03 17 08 Fokontany selected rural areas Selection d'Ambohitrinilahy, Commune de Mahereza, District d'AMBOHIDRATRIMO DRT13CFAGEX1939 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 304.83 Completed 08 08 08 10 08 28 10 04 03 17 15 Fokontany d'Ambohibao, selected rural areas Selection Commune d'Antehiroka, District d'AMBOHIDRATRIMO DRT13CFAGEX1940 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 299.94 Completed 08 08 08 10 08 28 10 04 03 17 15 Fokontany d'Ankazobe I, selected rural areas Selection Commune d'Ankazobe, District d'ANKAZOBE DRT13CFAGEX1941 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 299.94 Completed 08 08 08 10 08 28 10 04 03 17 15 Fokontany d'Ankazobe II, selected rural areas Selection Commune d'Ankazobe, District d'ANKAZOBE DRT13CFAGEX1942 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 300.06 Completed 08 08 08 10 08 28 10 04 03 17 15 Fokontany selected rural areas Selection d'Ambohitrankizy, Commune d'Ankazobe, District d'ANKAZOBE DRT13CFAGEX1944 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-06- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed 08 08 08 10 08 28 10 04 03 17 03 Fokontany d'Antsahabe, selected rural areas Selection Commune de Bongatsara, District d'ATSIMONDRANO DRT13CFAGEX1945 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany 08 08 08 10 08 28 10 04 03 17 16 selected rural areas Selection d'Ankadilalampotsy, Commune d'Ankaraobato, District d'ANTANANARIVO ATSIMONDRANO Page 9 DRT13CFAGEX1952 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany 08 08 08 10 08 28 10 04 03 17 12 selected rural areas Selection d'Ambohitrarahaba, Commune d'Ankadikely ilafy, District d'ANTANANARIVO AVARADRANO DRT13CFAGEX1953 / Encadrement et paiement des bénéficiaires de l'ACT post catastrophe dans le Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- Fokontany IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed 08 08 08 10 08 28 10 04 03 17 12 d'Ambohimangakely, selected rural areas Selection Commune d'Ambohimangakely, District d'ANTANANARIVO AVARADRANO DRT13CFAGEX1954 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany d'Ambolo, 08 08 08 10 10 28 10 04 03 17 12 selected rural areas Selection Commune de Talata volonondry, District d'ANTANANARIVO AVARADRANO DRT13CFAGEX1955 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant post catastrophe dans le 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 277.12 Completed Fokontany d'Ambatomalaza, 08 08 08 10 08 28 10 04 03 17 09 selected rural areas Selection Commune d'Alasora, District d'ANTANANARIVO AVARADRANO DRT13CFAGEX1961 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 327.20 Completed 08 08 08 10 08 28 10 04 15 17 12 Fokontany de Vohitrarivo, selected rural areas Selection Commune d'ANTSIRABE, District d'ANTSIRABE I DRT13CFAGEX1962 / Encadrement et paiement des bénéficiaires de l'ACT Component 1: Building a Consultant 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-06- 2019-07- post catastrophe dans le IDA / 57080 safety net for the poor in Post Qualification Open - National 3,521.00 327.20 Completed 08 08 08 10 08 28 10 04 15 17 12 Fokontany d'Ambalavato, selected rural areas Selection Commune d'ANTSIRABE, District d'ANTSIRABE I DG20CETUDFAISB1901 / Cabinet en charge de l'étude Component 2: de faisabilité et d'évaluation Strengthening safety net Quality Based 2019-07- 2019-08- 2019-08- 2019-09- 2019-10- 2019-10- 2019-10- 2020-10- IDA / 57080 Post Open - National 75,000.00 0.00 Canceled d'un projet de numérisation administration, monitoring Selection 19 09 24 23 08 13 19 18 du système de paiement et and social accountability d'enregistrement DG20CABRECERTBTF1901 / Recrutement d'un Cabinet en charge de la collecte des Component 2: Consultant données en vue de la Strengthening safety net 2019-07- 2019-08- 2019-08- 2019-08- 2019-12- 2019-08- 2020-02- 2019-08- 2020-02- 2019-11- IDA / 57080 Post Qualification Open - National 39,000.00 30,298.59 Signed recertification des administration, monitoring 19 01 09 17 17 22 05 28 27 26 Selection bénéficiaires des activités and social accountability TMDH du District de Betafo dans le cadre du projet FSS DG11CETUDFMOBMON1901 / Cabinet en charge de Component 1: Building a Consultant 2019-08- 2019-08- 2019-09- 2019-10- 2019-10- 2019-12- l'étude de faisabilité du IDA / 57080 safety net for the poor in Post Qualification Open - National 70,000.00 0.00 Canceled 16 31 13 04 11 10 paiement par mobile money selected rural areas Selection dans toutes les zones d'intervention du FID DRT11CFAGEC19002 / Encadrement des Component 1: Building a Quality And bénéficiaires de l'ACT-P 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 24,000.00 21,773.35 Signed dans le District 06 14 09 27 24 11 13 16 20 29 27 06 07 14 selected rural areas Selection d'Antanifotsy : UTB AMBILONA I et UTB MANANITRA - lot 2 DRT11CFAGEC19003 / Encadrement des Component 1: Building a Quality And bénéficiaires de l'ACT-P 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 22,000.00 20,440.87 Signed dans le District 06 14 09 27 24 11 13 16 20 29 27 06 07 14 selected rural areas Selection d'Antanifotsy : UTB SOAMANANDRARINY et UTB ANDOHAFARIHY - lot 3 DRT11CFAGEC19004 / Encadrement des Component 1: Building a Quality And bénéficiaires de l'ACT-P 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 31,000.00 28,674.37 Signed dans le District 06 14 09 27 24 11 13 16 20 29 27 06 07 14 selected rural areas Selection d'Antanifotsy : UTB AMBATODIDY et UTB AMBATOLAHY - lot 4 DRT11CFAGEC19005 / Encadrement des Component 1: Building a Quality And bénéficiaires de l'ACT-P 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 22,000.00 18,513.86 Signed dans le District 06 14 09 27 24 11 13 16 20 29 27 06 07 14 selected rural areas Selection d'Antanifotsy : UTB ANTAMBOHOMENA et UTB AMBATOMIADY - lot 5 DRT11CFAGEC19006 / Encadrement des Component 1: Building a Quality And bénéficiaires de l'ACT-P 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 26,000.00 11,207.75 Signed dans le District 06 14 09 27 24 11 13 16 20 29 27 06 07 14 selected rural areas Selection d'Antanifotsy : UTB TSARAHONENANA et UTB MAHATSINJO - lot 6 DRT11CFAGEC19007 / Encadrement des Component 1: Building a Quality And bénéficiaires de l'ACT-P 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 24,000.00 22,860.36 Signed dans le District 06 14 09 27 24 11 13 16 20 29 27 06 07 14 selected rural areas Selection d'Antanifotsy : UTB AMPITATAFIKA et UTB AMBOHIMANDROSO A - lot 7 DRT11CFAGEC19008 / Component 1: Building a Quality And Encadrement des 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 19,000.00 17,742.69 Signed bénéficiaires de l'ACT-P 06 14 09 27 24 11 13 16 20 29 27 06 07 14 selected rural areas Selection dans le District d'Antanifotsy : DRT11CFAGEC19009 / Encadrement des Component 1: Building a Quality And bénéficiaires de l'ACT-P 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 29,000.00 26,462.39 Signed dans le District 06 14 09 27 24 11 16 16 20 29 27 06 07 14 selected rural areas Selection d'Antanifotsy : UTB ANTEMOTRA et UTB ANTANAMBAO - lot 9 DRT11CFAGEC19010 / Encadrement des Component 1: Building a Quality And 2019-12- 2020-02- 2019-12- 2019-12- 2020-06- 2020-01- 2020-07- 2020-01- 2020-08- 2020-01- 2020-09- 2020-02- 2020-10- 2022-08- bénéficiaires de l'ACT-P IDA / D4340 safety net for the poor in Post Cost-Based Open - National 52,000.00 20,581.35 Signed 06 14 09 27 17 11 07 16 18 29 16 06 15 14 dans le District selected rural areas Selection d'Arivonimamo : Terroir 1 et Terroir 2 - LOT 1 DRT11CFAGEC19011 / Encadrement des Component 1: Building a Quality And 2019-12- 2020-02- 2019-12- 2019-12- 2020-06- 2020-01- 2020-07- 2020-01- 2020-08- 2020-01- 2020-09- 2020-02- 2020-10- 2022-08- bénéficiaires de l'ACT-P IDA / D4340 safety net for the poor in Post Cost-Based Open - National 52,000.00 23,930.77 Signed 06 14 09 27 17 11 07 16 18 29 16 06 15 14 dans le District selected rural areas Selection d'Arivonimamo : Terroir 3 et Terroir 4 - LOT 2 DRK11CFPLAN19001 / AGENCE DE PLANIFICATION CHARGÉE DU SUIVI ET Component 1: Building a Quality And 2019-11- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2022-06- SUPERVISION DES IDA / D4340 safety net for the poor in Post Cost-Based Open - National 73,000.00 37,265.85 Signed 28 05 13 15 03 14 28 19 28 27 02 05 16 14 CHANTIERS, SUIVI- selected rural areas Selection ÉVALUATION COMMUNAUTAIRE, MISE A JOUR DES PAMO DRF11CFAP19001 / Component 1: Building a Quality And RECRUTEMENT AGENCE DE 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-05- 2020-01- 2020-05- 2022-06- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 73,000.00 44,526.45 Signed PLANIFICATION ACTP POUR 12 04 12 12 05 11 06 11 11 16 13 26 29 04 selected rural areas Selection LE DISTRICT D'ISANDRA DRF11CFAP19002 / Component 1: Building a Quality And RECRUTEMENT AGENCE DE 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-04- 2022-06- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 73,000.00 33,223.70 Signed PLANIFICATION DANS LE 12 04 12 12 05 11 06 11 11 16 26 26 10 04 selected rural areas Selection DISTRICT DE MANANDRIANA Component 1: Building a Quality And DRK11CFAGEC19001 / 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 94,200.00 36,006.47 Signed AGENCE D'ENCADREMENT 28 07 03 21 20 20 09 22 09 26 10 07 26 07 selected rural areas Selection DRF11CFCCI19001 / Component 1: Building a Quality And RECRUTEMENT CABINET DE 2019-12- 2020-01- 2019-12- 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-04- 2020-05- 2020-05- 2020-06- 2020-05- 2020-12- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 6,000.00 12,561.84 Signed CIBLAGE POUR LE DISTRICT 05 20 26 08 19 07 17 06 28 11 11 15 28 12 selected rural areas Selection DE MANANDRIANA DRF11CFAGEC19001 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-04- 2022-07- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 100,000.00 23,251.39 Signed D'ENCADREMENT LOT 01 15 14 05 20 21 17 10 17 13 21 25 26 07 16 selected rural areas Selection ACTP ISANDRA DRF11CFAGEC19002 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-03- 2022-07- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 100,000.00 9,573.11 Signed D'ENCADREMENT ACTP LOT 15 14 05 20 21 17 10 17 13 21 24 26 30 16 selected rural areas Selection 02 ISANDRA DRF11CFAGEC19003 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-03- 2022-07- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 100,000.00 10,427.57 Signed D'ENCADREMENT ACTP 15 14 05 20 21 17 13 17 16 21 26 26 30 16 selected rural areas Selection POUR LE DISTRICT ISANDRA LOT 03 DRF11CFAGEC19004 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-03- 2022-07- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 100,000.00 18,292.81 Signed D'ENCADREMENT ACTP 15 14 05 20 21 17 10 17 13 21 24 26 30 16 selected rural areas Selection ISANDRA LOT 04 DRF11CFAGEC19005 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-03- 2022-07- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 100,000.00 8,061.54 Signed D'ENCADREMENT ACTP LOT 15 14 05 20 21 17 10 17 13 21 25 26 31 16 selected rural areas Selection 05 DISTRICT ISANDRA DRF11CFAGEC19006 / RECRUTEMENT Component 1: Building a Quality And 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-04- 2022-07- AGENCED'ENCADREMENT IDA / D4340 safety net for the poor in Post Cost-Based Open - National 100,000.00 21,371.74 Signed 15 14 05 20 21 17 13 17 13 21 24 26 06 16 ACTP DISTRICT ISANDRA selected rural areas Selection LOT 06 DRF11CFAGEC19007 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-03- 2020-07- 2020-04- 2022-07- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 100,000.00 21,010.12 Signed D'ENCADREMENT ACTP LOT 15 14 05 20 21 17 10 17 13 21 24 26 06 16 selected rural areas Selection 01 DISTRICT MANANDRIANA Component 1: Building a Quality And DRK11CFAGEC19002 / 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 94,200.00 40,613.64 Signed AGENCE D'ENCADREMENT 28 07 03 21 20 20 06 22 06 26 23 07 24 07 selected rural areas Selection DRK11CFAGEC19003 / Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2022-04- AGENCE D'ENCADREMENT IDA / D4340 safety net for the poor in Post Cost-Based Open - National 94,200.00 49,055.55 Signed 28 07 03 21 20 20 06 22 06 26 12 07 26 07 ACTP selected rural areas Selection DRK11CFAGEC19004 / Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2022-04- AGENCE D'ENCADREMENT IDA / D4340 safety net for the poor in Post Cost-Based Open - National 94,200.00 39,918.86 Signed 28 07 03 21 20 20 06 22 06 26 23 07 24 07 ACTP selected rural areas Selection DRK11CFAGEC19005 / Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2022-04- AGENCE D'ENCADREMENT IDA / D4340 safety net for the poor in Post Cost-Based Open - National 94,200.00 20,142.28 Signed 28 07 03 21 20 20 06 22 06 26 23 07 24 07 ACTP selected rural areas Selection DRK11CFAGEC19006 / Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2022-04- AGENCE D'ENCADREMENT IDA / D4340 safety net for the poor in Post Cost-Based Open - National 94,200.00 25,731.47 Signed 28 07 03 21 20 20 06 22 06 26 10 07 25 07 ACTP selected rural areas Selection DRK11CFAGEC19007 / Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2022-04- AGENCE D'ENCADREMENT IDA / D4340 safety net for the poor in Post Cost-Based Open - National 94,800.00 24,303.04 Signed 28 07 03 21 20 20 06 22 06 26 12 07 24 07 ACTP selected rural areas Selection DRU11CFPLAN19001 / AGENCE DE PLANIFICATION CHARGÉE DE LA Component 1: Building a Quality And PLANIFICATION, DU SUIVI ET Pending 2020-02- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 73,000.00 0.00 SUPERVISION DES Implementation 09 09 selected rural areas Selection CHANTIERS, SUIVI- ÉVALUATION COMMUNAUTAIRE, MISE A JOUR DES PAMO DRU11CFAGEC19001 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2019-06- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2020-03- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 84,246.00 29,022.55 Signed D'ENCADREMENT ACTP LOT 13 12 03 03 08 18 14 21 20 02 25 09 31 09 selected rural areas Selection 01 DISTRICT ANKAZOABO DRT11CFPLAN19001 / Component 1: Building a Quality And 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-04- 2020-02- 2020-04- 2020-02- 2020-05- 2022-08- Agence de planification de IDA / D4340 safety net for the poor in Post Cost-Based Open - National 32,000.00 20,580.12 Signed 11 04 12 28 06 25 27 25 03 11 21 21 05 29 l'ACTP Antanifotsy selected rural areas Selection DRU11CFAGEC19002 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2019-06- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2020-03- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 70,129.00 13,408.73 Signed D'ENCADREMENT ACTP LOT 13 12 03 03 08 18 14 21 18 02 25 09 31 09 selected rural areas Selection 02 DISTRICT ANKAZOABO DRU11CFAGEC19003 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2019-06- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2020-03- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 88,493.00 22,106.55 Signed D'ENCADREMENT ACTP LOT 13 12 03 03 08 18 19 21 20 02 26 09 31 09 selected rural areas Selection 03 DISTRICT ANKAZOABO DRU11CFAGEC19004 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2019-06- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2020-03- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 51,649.00 13,252.75 Signed D'ENCADREMENT ACTP LOT 13 12 03 03 08 18 18 21 20 02 25 09 31 09 selected rural areas Selection 04 DISTRICT ANKAZOABO DRU11CFAGEC19005 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2019-06- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2020-03- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 78,278.00 11,759.96 Signed D'ENCADREMENT ACTP LOT 13 12 03 03 08 18 14 21 17 02 25 09 31 09 selected rural areas Selection 05 DISTRICT ANKAZOABO DRT11CFPLAN19002 / Component 1: Building a Quality And 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-02- 2020-05- 2022-08- Agence de planification de IDA / D4340 safety net for the poor in Post Cost-Based Open - National 32,000.00 20,342.91 Signed 11 04 12 28 06 25 27 25 03 11 21 21 05 29 l'ACTP Antanifotsy selected rural areas Selection DRT11CFPLAN19003 / Component 1: Building a Quality And 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-04- 2020-02- 2020-04- 2020-02- 2020-05- 2022-08- Agence de planification de IDA / D4340 safety net for the poor in Post Cost-Based Open - National 32,000.00 23,229.65 Signed 11 04 12 28 06 25 27 25 03 11 21 21 05 29 l'ACTP Antanifotsy selected rural areas Selection DRT11CFPLAN19004 / Component 1: Building a Quality And 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2020-02- 2020-04- 2020-02- 2020-05- 2022-08- Agence de planification de IDA / D4340 safety net for the poor in Post Cost-Based Open - National 21,000.00 30,286.02 Signed 11 04 12 28 06 25 27 25 06 11 21 21 05 29 l'ACTP Arivonimamo selected rural areas Selection DRT11CFCIC19001 / Cabinet chargé de l'appui au Component 1: Building a Quality And 2019-12- 2020-01- 2019-12- 2019-12- 2020-03- 2020-01- 2020-04- 2020-01- 2020-04- 2020-02- 2020-06- 2020-02- 2020-07- 2020-07- ciblage communautaire des IDA / D4340 safety net for the poor in Post Cost-Based Open - National 36,500.00 10,175.79 Signed 11 24 12 28 20 25 06 25 27 11 08 21 24 20 activités ACTP dans le selected rural areas Selection District d'Arivonimamo DRA11CFAGEC19001 / ENCADREMENT Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- INTERVETION 1 - 02 IDA / D4340 safety net for the poor in Post Cost-Based Open - National 13,000.00 20,833.96 Signed 28 20 13 21 21 20 12 30 12 07 25 21 03 20 ACTIVITES ARGENT CONTRE selected rural areas Selection TRAVAIL PRODUCTIF TERROIR ILAKA EST DRA11CFAGEC19002 / ENCADREMENT Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- INTERVETION 1 - 02 IDA / D4340 safety net for the poor in Post Cost-Based Open - National 12,500.00 14,942.14 Signed 28 20 13 21 21 20 13 30 13 07 25 21 03 20 ACTIVITES ARGENT CONTRE selected rural areas Selection TRAVAIL PRODUCTIF TERROIR TSIVANGIANA DRA11CFAGEC19003 / ENCADREMENT Component 1: Building a Quality And INTERVETION 1 - 02 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 14,300.00 24,116.95 Signed ACTIVITES ARGENT CONTRE 28 20 13 21 21 20 11 30 11 07 25 21 03 20 selected rural areas Selection TRAVAIL PRODUCTIF TERROIR AMPANALNA et TERROIR AMBALAVOLO DRA11CFAGEC19004 / ENCADREMENT Component 1: Building a Quality And INTERVETION 1 - 02 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 13,200.00 19,960.39 Signed ACTIVITES ARGENT CONTRE 28 20 13 21 21 20 11 30 24 07 25 21 03 20 selected rural areas Selection TRAVAIL PRODUCTIF TERROIR NIAROVANA CAROLINE DRA11CFAGEC19005 / ENCADREMENT Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- INTERVETION 1 - 02 IDA / D4340 safety net for the poor in Post Cost-Based Open - National 8,500.00 15,154.88 Signed 28 20 13 21 21 20 13 30 13 07 25 21 03 20 ACTIVITES ARGENT CONTRE selected rural areas Selection TRAVAIL PRODUCTIF TERROIR TSARASAMBO DRA11CFAGEC19006 / ENCADREMENT Component 1: Building a Quality And INTERVETION 1 - 02 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 8,500.00 13,949.82 Signed ACTIVITES ARGENT CONTRE 28 20 13 21 21 20 12 30 12 07 25 21 03 20 selected rural areas Selection TRAVAIL PRODUCTIF TERROIR TANAMBAO VATRAKAKA DRA11CFAGEC19007 / ENCADREMENT Component 1: Building a Quality And 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- INTERVETION 1 - 02 IDA / D4340 safety net for the poor in Post Cost-Based Open - National 11,800.00 17,256.96 Signed 28 20 13 21 21 20 12 30 24 07 27 21 03 20 ACTIVITES ARGENT CONTRE selected rural areas Selection TRAVAIL PRODUCTIF TERROIR SAHAMATEVINA DRA11CFAGEC19008 / ENCADREMENT Component 1: Building a Quality And INTERVETION 1 - 02 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 11,400.00 24,800.93 Signed ACTIVITES ARENT CONTRE 28 20 13 21 21 20 13 30 24 07 27 21 03 20 selected rural areas Selection TRAVAIL PRODUCTIF TERROIR AMBODIVOANANTO et TERROIR BEANGIVY DRA11CFPLAN19001 / Planifications : opérationnalisation des Component 1: Building a Quality And plans au mois de février 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2020-02- 2020-04- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 73,900.00 28,282.56 Signed 2019 et assurent le suivi de 28 04 13 20 04 19 05 24 27 01 04 13 22 13 selected rural areas Selection mise en œuvre et l’appui au suivi-évaluation communautaire ( 2 interventions à 04 activités) Page 10 DG20CFAGEX2001 / Component 3: Building the Agence d'encadrement et de institutional capacity for Consultant paiement ACT Post 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- IDA / D4340 coordination, monitoring Post Qualification Open - National 15,000.00 13,103.61 Signed Catastrophe de 2 sites: 07 08 07 13 08 17 10 20 10 31 and evaluation of the social Selection assainissement et curage protection syst em canal à FIOFIO et à Ambalavola DG20CFAGEX2002 / Component 3: Building the Agence d'encadrement et de institutional capacity for Consultant paiement ACT Post 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- IDA / D4340 coordination, monitoring Post Qualification Open - National 15,000.00 13,103.61 Signed Catastrophe de 2 sites: 07 08 07 13 08 17 10 20 10 31 and evaluation of the social Selection assainissement et curage protection syst em canal à Mahavoky Avaratra et Tsararano Nosikely DRT13CFAGEX2001 / Encadrement et paiement des bénficiaires de l'ACT postcatastrophe dans deux Component 1: Building a Consultant 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- secteurs dans le Fokontany IDA / D4340 safety net for the poor in Post Qualification Open - National 7,000.00 617.46 Completed 14 14 14 16 15 03 17 10 20 24 06 d'Ampanotokana, Commune selected rural areas Selection urbaine d'Antananarivo, District d'Antananarivo V, Région d'Analamanga DG20CFAGEX2003 / Encadrement et paiement ACT Post Catastrophe: Component 1: Building a Consultant 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- travaux d'urgence IDA / D4340 safety net for the poor in Post Qualification Open - National 28,000.00 26,256.00 Signed 16 08 17 24 24 28 29 28 30 08 d'assainissement et de selected rural areas Selection nettoyage dans le Fokontany de Tsararano Ambany DRA13CFAGEX20002 / PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant INTENSITE DE MAIN- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- IDA / D4340 safety net for the poor in Post Qualification Open - National 21,710.00 1,865.18 Signed D’OEUVRE : ENCADREMENT 28 28 28 30 28 12 29 17 30 19 selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 03 FKT COMMUNE RURALE ILAFY DIST AMBATONDRAZAKA DRA13CFAGEX20001 / PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant INTENSITE DE MAIN- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- IDA / D4340 safety net for the poor in Post Qualification Open - National 21,710.00 1,858.99 Signed D’OEUVRE : ENCADREMENT 28 28 28 30 29 12 29 17 30 19 selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 03 FKT COMMUNE RURALE TANAMBE DIST AMPARAFARAVOLA DRA13CFAGEX20003 / DRA13CFAGEX20003 PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- INTENSITE DE MAIN- IDA / D4340 safety net for the poor in Post Qualification Open - National 17,310.00 1,348.33 Signed 05 12 05 07 13 20 12 25 14 27 D’OEUVRE : ENCADREMENT selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 04 FKT COMMUNE URBAINE AMBATONDRAZAKA DIST AMBATONDRAZAKA DRA13CFAGEX20004 / DRA13CFAGEX20004 PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- INTENSITE DE MAIN- IDA / D4340 safety net for the poor in Post Qualification Open - National 17,310.00 1,363.82 Signed 05 12 05 07 13 20 14 25 14 27 D’OEUVRE : ENCADREMENT selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 04 FKT COMMUNE RURALE TANAMBE DIST AMPARAFARAVOLA DRA13CFAGEX20005 / DRA13CFAGEX20005 PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- INTENSITE DE MAIN- IDA / D4340 safety net for the poor in Post Qualification Open - National 17,310.00 1,372.09 Signed 05 12 05 07 13 20 14 25 14 27 D’OEUVRE : ENCADREMENT selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 04 FKT COMMUNE RURALE BEANANA DIST AMPARAFARAVOLA DRA13CFAGEX20006 / DRA13CFAGEX20006 PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- INTENSITE DE MAIN- IDA / D4340 safety net for the poor in Post Qualification Open - National 17,310.00 1,334.17 Signed 05 12 05 07 13 20 13 25 14 27 D’OEUVRE : ENCADREMENT selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 04 FKT COMMUNE URBAINE MORAMANGA DIST MORAMANGA DG20CFAGEX2004 / Encadrement et paiement ACT Post Catastrophe: travaux d'urgence Component 3: Building the d'assainissement et de institutional capacity for Consultant 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-04- nettoyage dans les IDA / D4340 coordination, monitoring Post Qualification Open - National 30,000.00 26,089.51 Signed 15 08 15 21 14 25 25 28 25 28 Fokontany MATIAKOHO, and evaluation of the social Selection ANTAFIAKASAKA,ANTANAM protection syst em ARIAZY, ANTANAMARIAZY - Commune : AMBILOBE - District : AMBILOBE - Région : DIANA DG20CFAGEX2005 / Encadrement et paiement ACT Post Catastrophe: travaux d'urgence Component 3: Building the d'assainissement et de institutional capacity for Consultant nettoyage dans les 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-04- IDA / D4340 coordination, monitoring Post Qualification Open - National 25,000.00 0.00 Canceled Fokontany SENGALOKA, 15 25 15 21 25 28 28 and evaluation of the social Selection MATSABORILAIDAMA, protection syst em MATSABORILAIDAMA, MANTALIMARO ANDREFANA - Commune : AMBILOBE - District : AMBILOBE - Région : DIANA DG20CFAGEX2006 / Encadrement et paiement ACT Post Catastrophe: Component 3: Building the travaux d'urgence institutional capacity for Consultant d'assainissement et de 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-04- IDA / D4340 coordination, monitoring Post Qualification Open - National 15,000.00 12,778.13 Signed nettoyage dans les 15 08 15 21 14 25 05 28 05 28 and evaluation of the social Selection Fokontany protection syst em AMBALAMAHATSINJO, TSARATANANA - Commune : AMBILOBE - District : AMBILOBE - Région : DIANA DRA13CFAGEX20007 / PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant INTENSITE DE MAIN- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-02- 2020-03- IDA / D4340 safety net for the poor in Post Qualification Open - National 12,664.00 1,007.37 Signed D’OEUVRE : ENCADREMENT 20 24 20 22 25 06 26 11 27 31 selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 03 FKT COMMUNE URBAINE MAHANORO DIST MAHANORO DRA13CFAGEX20008 / PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant INTENSITE DE MAIN- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-02- 2020-03- IDA / D4340 safety net for the poor in Post Qualification Open - National 16,889.00 1,357.94 Signed D’OEUVRE : ENCADREMENT 20 24 20 22 25 06 26 11 27 31 selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 04 FKT COMMUNE URBAINE MAHANORO DIST MAHANORO DRA13CFAGEX20009 / PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant INTENSITE DE MAIN- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-02- 2020-03- IDA / D4340 safety net for the poor in Post Qualification Open - National 12,664.00 1,023.90 Signed D’OEUVRE : ENCADREMENT 20 24 20 22 25 06 26 11 27 31 selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 03 FKT COMMUNE RURALE AMBODIHARINA DIST MAHANORO DRA13CFAGEX20010 / PRESTATION DE SERVICE POUR LA REALISATION DE MICRO- PROJETS A HAUTE Component 1: Building a Consultant INTENSITE DE MAIN- 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-02- 2020-03- IDA / D4340 safety net for the poor in Post Qualification Open - National 12,664.00 1,007.76 Signed D’OEUVRE : ENCADREMENT 20 24 20 22 25 06 26 11 27 31 selected rural areas Selection ET PAIEMENT ACT POST CATASTROPHE DES 03 FKT COMMUNE URBAINE VATOMANDRY DIST VATOMANDRY DG20CFAGEX2007 / Prestation d'une Agence d'encadrement pour la mise Component 3: Building the en œuvre de micro-projet institutional capacity for Consultant 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- ACT PC dans les Fokontany IDA / D4340 coordination, monitoring Post Qualification Open - National 15,000.00 0.00 Canceled 10 31 14 13 18 14 AMBONDRONA et and evaluation of the social Selection AMBATOMITRAKA - protection syst em Commune : ANTALAHA - District : ANTALAHA - Région : SAVA, DG20CFAGEX2008 / Prestation d'une Agence d'encadrement pour la mise Component 3: Building the en œuvre de micro-projet institutional capacity for Consultant 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- ACT PC dans les Fokontany IDA / D4340 coordination, monitoring Post Qualification Open - National 15,000.00 0.00 Canceled 10 31 14 13 18 14 ANKOALABE et and evaluation of the social Selection ANTSONASONA - Commune protection syst em : ANTALAHA - District : ANTALAHA - Région : SAVA, DRF11CFAGEC19008 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-04- 2022-05- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 100,000.00 23,314.16 Signed D'ENCADREMENT ACTP LOT 06 14 13 10 21 09 10 08 13 06 24 03 06 24 selected rural areas Selection 09 DISTRICT ISANDRA DRT11CFAGEC19001 / Encadrement des Component 1: Building a Quality And bénéficiaires de l'ACT-P 2019-12- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-04- 2022-08- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 43,000.00 34,080.10 Signed dans le District 06 14 09 27 24 11 13 16 20 29 27 06 07 14 selected rural areas Selection d'Antanifotsy : UTB BELANITRA et UTB AMBOHITOMPOINA - lot 3 DRF11CFAGEC20001 / PRESTATAIRE DE SERVICE DES AGEC POUR Component 1: Building a Quality And L'ENCADREMENT DES 2020-05- 2020-02- 2020-06- 2020-07- 2020-06- 2020-08- 2020-06- 2020-09- 2020-07- 2020-11- 2020-07- 2020-12- 2020-08- 2022-11- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 60,000.00 15,120.67 Signed TRAVAUX ET DES 27 14 17 31 09 28 22 27 02 01 09 06 11 26 selected rural areas Selection BENEFICIAIRES DANS LE CADRE DU PROGRAMME ACTP - TERROIR AMBOVOMBE - MANANDRIANA DRT11CFPLAN19005 / Component 1: Building a Quality And 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-02- 2022-08- Agence de planification de IDA / D4340 safety net for the poor in Post Cost-Based Open - National 21,000.00 0.00 Canceled 11 12 28 25 25 11 21 29 l'ACTP Arivonimamo selected rural areas Selection DRK11CFPLAN20001 / Recrutement d'une Agence Component 1: Building a Quality And de Planification chargée du Under 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-08- 2020-09- 2022-11- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 53,380.00 0.00 suivi et supervisions des Implementation 19 03 04 11 10 15 23 04 03 selected rural areas Selection chantiers des 15 terroirs dans le districts de Manakara. DRU11CFAGEC19006 / Component 1: Building a Quality And RECRUTEMENT AGENCE 2020-01- 2020-02- 2020-03- 2020-03- 2020-03- 2020-04- 2020-04- 2022-04- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 27,202.00 0.00 Canceled D'ENCADREMENT ACTP LOT 13 03 03 18 21 02 09 09 selected rural areas Selection 06 DISTRICT ANKAZOABO DRF11_SMC_AGEC2001 / Sélection d'Agences chargées de l'encadrement Component 1: Building a des travaux et des Least Cost 2020-06- 2020-08- 2020-06- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-08- 2020-12- 2020-09- 2022-12- IDA / D4340 safety net for the poor in Post Open - National 450,000.00 114,340.20 Signed bénéficiaires dans le cadre Selection 30 10 30 14 10 11 18 08 21 20 25 08 29 08 selected rural areas du programme FSP dans la Région Haute Matsiatra - District de Manandriana répartis en huit (08) lots DG20_SMC_BE_MO_2001 / Sélection de bureaux d'étude chargés de la Component 1: Building a maîtrise d’œuvre des Least Cost 2020-06- 2020-05- 2020-06- 2020-07- 2020-07- 2020-08- 2020-07- 2020-09- 2020-08- 2020-10- 2020-08- 2020-11- 2020-09- 2021-11- IDA / D4340 safety net for the poor in Post Open - National 100,000.00 53,331.15 Signed infrastructures socio- Selection 30 27 30 07 03 04 31 01 14 06 20 10 07 10 selected rural areas économiques de base dans la Région Boeny, Districts de Soalala et Mahajanga 2, répartie en quatre (04) lots DRA11CFAGEC19009 / ENCADREMENT Component 1: Building a Quality And INTERVETION 1 - 02 2019-11- 2020-02- 2019-12- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-02- 2020-03- 2020-02- 2020-04- 2021-02- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 12,900.00 20,535.04 Signed ACTIVITES ARENT CONTRE 28 20 13 21 21 20 11 30 24 07 27 21 03 20 selected rural areas Selection TRAVAIL PRODUCTIF TERROIR ANDRORANGA et BEANGIVY DRU13CFAGEX19013 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 12 14 17 17 20 20 22 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT 13 DRU13CFAGEX19006 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-01- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 24 05 06 04 08 05 08 05 10 05 10 12 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT TANAMBAO MOTOMBE DRU13CFAGEX19011 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 12 14 17 17 20 20 22 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT 11 DRU13CFAGEX19009 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 05 06 08 08 10 10 12 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT MAHAVATSE II EST DRU13CFAGEX19010 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 12 14 17 17 20 20 22 selected rural areas Selection DE MAIN-D'ŒUVRE ACT CP FKT 10 DRU13CFAGEX19012 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 12 14 17 17 20 20 22 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT 12 DRU13CFAGEX19015 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 12 14 17 17 20 20 22 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT 15 DRU13CFAGEX19014 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 12 14 17 17 20 20 22 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT 14 DRU13CFAGEX19007 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 05 06 08 08 10 10 12 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT TANAMBAO DRU13CFAGEX19008 / ENCADREMENT ET Component 1: Building a Quality And SUPERVISION DES MICRO- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- IDA / 57080 safety net for the poor in Post Cost-Based Open - National 704.05 0.00 Canceled PROJETS A HAUTE INTENSITE 04 05 06 08 08 10 10 12 selected rural areas Selection DE MAIN-D'ŒUVRE ACT PC FKT MAHAVATSE II OUEST DRT11CFAGEC20001 / Recrutement d'Agence Component 1: Building a Quality And d'encadrement des Under 2020-09- 2020-02- 2020-09- 2020-10- 2020-11- 2020-11- 2020-11- 2020-12- 2022-10- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 135,905.00 0.00 bénéficiaires du FSP dans le Implementation 21 14 21 05 02 09 30 21 02 selected rural areas Selection District d'Arivonimamo _ 05 lots. DRT13CFMO20001 / Recrutement de bureaux d'étude chargés de la maitrise d'œuvre des Component 1: Building a Quality And travaux de reconstruction et Under 2020-09- 2020-10- 2020-09- 2020-10- 2020-11- 2020-11- 2020-11- 2020-12- 2022-02- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 25,000.00 0.00 de réhabilitation des Implementation 21 23 21 08 07 17 29 17 25 selected rural areas Selection infrastructures socio- économiques de base dans les régions Analamanga et Menabe _ Deux (02) lots DRA13 SFQC CFMO 20001 / Recrutement d'un bureau d'étude chargé de la maîtrise d'œuvre des Component 1: Building a Quality And Under 2020-09- 2020-10- 2020-10- 2020-10- 2020-11- 2020-11- 2020-12- 2020-12- 2021-12- travaux de reconstruction et IDA / D4340 safety net for the poor in Post Cost-Based Open - National 10,000.00 0.00 Implementation 25 01 10 20 19 29 09 24 24 de réhabilitation des selected rural areas Selection infrastructures socio- économiques de base dans la Région Alaotra Mangoro Page 11 DG20_SMC_AUDIT_TF_2018 / Recrutement d'un cabinet Component 1: Building a Least Cost Under 2020-10- 2020-10- 2020-10- 2020-11- 2020-11- 2020-12- 2020-12- 2020-12- 2021-01- 2021-02- 2021-04- chargé de l'audit financier IDA / D4340 safety net for the poor in Post Open - National 20,000.00 0.00 Selection Implementation 19 27 26 16 06 16 03 30 27 24 25 des activités relatives à la selected rural areas mise en œuvre du Tosika Fameno DRK11_SFQC_AGEC20008 / Prestation de service d'encadrement des Component 1: Building a Quality And Pending 2020-11- 2020-12- 2020-12- 2021-01- 2021-01- 2021-01- 2021-02- 2021-02- bénéficiaires des terroirs de IDA / D4340 safety net for the poor in Post Cost-Based Open - National 13,800.00 0.00 Implementation 27 02 20 19 21 25 06 09 Sahanambohitra et de selected rural areas Selection Sahanambohitra dans le District de Manakara DRA11_SFQC_PLAN20001 / Recrutement agence de planification pour l'opérationnalisation des Component 1: Building a Quality And 2020-11- 2021-01- 2020-12- 2020-12- 2020-01- 2021-01- 2020-03- 2021-01- 2020-03- 2021-02- 2020-03- 2021-02- 2020-04- 2022-02- plans au mois de Mars 2021 IDA / D4340 safety net for the poor in Post Cost-Based Open - National 22,000.00 28,497.70 Signed 30 22 15 22 24 21 09 26 19 03 30 16 28 16 et assure le suivi de mise en selected rural areas Selection œuvre et l’appui au suivi- évaluation communautaire ( PAMO activité n°11 ) DG_SQC_FILM_COMM_2101 / Sélection d'une agence Component 1: Building a Consultant Pending 2021-01- 2021-02- 2021-04- 2021-05- 2021-06- 2021-09- chargée de la conception et IDA / D4340 safety net for the poor in Post Qualification Open - National 40,000.00 0.00 Implementation 29 19 04 04 08 06 réalisation de microfilms de selected rural areas Selection sensibilisation DG_SQC_ANALYSE_ORGA_FI D_2101 / Sélection d'un Component 1: Building a Consultant cabinet en charge de Under 2021-03- 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2021-11- IDA / D4340 safety net for the poor in Post Qualification Open - National 20,000.00 0.00 l'analyse organisationnelle Implementation 08 15 15 12 12 02 29 selected rural areas Selection et de la mise en œuvre du management qualité du FID DG_21010_SMC_BE_MO_SOF IA / Sélection de bureaux d'étude chargés de la maîtrise d’œuvre des Component 1: Building a Least Cost Under 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- 2021-06- 2021-07- 2021-08- 2022-08- infrastructures socio- IDA / D4340 safety net for the poor in Post Open - National 35,000.00 0.00 Selection Implementation 05 26 12 17 14 28 19 09 09 économiques de base dans selected rural areas la Région Sofia, Districts de Ambato Boeny, Antsohihy, Port Berger, Analalava, répartis en deux (02) lots DRA_21002_SMC_BE_MO / Recrutement des bureaux d'études pour la maitrise d'œuvre des travaux de Component 1: Building a Least Cost Under 2021-03- 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- 2021-06- 2021-07- 2022-07- réhabilitation et IDA / D4340 safety net for the poor in Post Open - National 57,000.00 0.00 Selection Implementation 25 27 09 21 19 02 16 05 05 reconstruction des selected rural areas infrastructures socio économique de base dans la région Analanjirofo DRT_21002_SMC_CIB_BEN / Recrutement d'un cabinet de Component 1: Building a Least Cost Under 2021-03- 2021-03- 2021-04- 2021-04- 2021-05- 2021-05- 2021-06- 2021-07- 2021-10- ciblage des 6 000 nouveaux IDA / D4340 safety net for the poor in Post Open - National 30,000.00 0.00 Selection Implementation 31 31 01 23 21 28 14 03 31 bénéficiaires du FSP selected rural areas Arivonimamo. DRT_21001_SQC_BE_MO / Recrutement de bureaux Component 1: Building a Consultant d'étude en vue de la Under 2021-04- 2021-04- 2021-04- 2021-05- 2021-05- 2021-06- 2022-06- IDA / D4340 safety net for the poor in Post Qualification Open - National 10,000.00 0.00 maîtrise d’œuvre des Implementation 13 13 23 15 30 11 11 selected rural areas Selection travaux dans les Régions d'Analamanga et de Menabe en 2 lots. DRU_21003_SQC_MAÎTRISE D’ŒUVRE / Maîtrise d'œuvre Component 1: Building a Consultant pour les travaux de Under 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- 2021-06- 2022-06- IDA / D4340 safety net for the poor in Post Qualification Open - National 4,000.00 0.00 reconstruction - CEG Implementation 12 12 19 24 08 18 18 selected rural areas Selection Ambolofoty et Ecole Préscolaire Ambolofoty DRK_21001_SFQC_CIB_BEN Component 1: Building a Quality And / Sélection de 03 agences Pending 2021-06- 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2021-10- 2021-12- IDA / D4340 safety net for the poor in Post Cost-Based Open - National 168,000.00 0.00 de ciblages des Implementation 10 24 22 21 05 03 31 20 selected rural areas Selection bénéficiaires du programme TMDH FSS-FA3 INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated Contract / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract No. Approach Amount (US$) Status Contract Completion (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DRU12CICMP17001 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-11- IDA / 57080 safety net for the poor in Post Consultant Limited 754.72 558.23 Completed enregistrement bénéficiaires 11 08 03 20 09 28 15 30 29 16 selected rural areas Selection TMDH Betioky CI1 DRF12CICMP17001 / COMPLEMENTATION Component 1: Building a Individual 2017-04- 2017-05- 2017-05- 2017-05- 2017-05- 2017-06- 2017-05- 2017-07- 2017-06- 2017-11- ENREGISTREMENT IDA / 57080 safety net for the poor in Post Consultant Limited 968.56 576.99 Completed 11 02 03 31 09 23 15 04 29 30 BENEFICIAIRES TMDH selected rural areas Selection AMBOHIMAHASOA DRT12CICMP17001 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-12- IDA / 57080 safety net for the poor in Post Consultant Limited 782.16 787.85 Completed enregistrement bénéficiaires 11 10 03 09 12 15 12 29 22 selected rural areas Selection TMDH du District de Faratsiho DRA12CICMP17001 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement béneficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 576.60 Completed 11 11 03 28 09 23 15 07 29 14 TMDH TOAMASINAII et selected rural areas Selection MAHANORO DRK12CICMP17001 / Component 1: Building a Individual COMPLEMENT 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-07- IDA / 57080 safety net for the poor in Post Consultant Limited 1,016.04 1,418.36 Completed ENREGISTREMENT TMDH 11 11 03 29 09 30 15 30 29 31 selected rural areas Selection VOHIPENO DRA12CICMP17002 / complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement béneficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 610.62 Completed 11 10 03 28 09 23 15 07 29 14 TMDH TOAMASINA II et selected rural areas Selection MAHANORO DRF12CICMP17002 / COMPLEMENTATION Component 1: Building a Individual 2017-04- 2017-05- 2017-05- 2017-07- 2017-05- 2017-07- 2017-05- 2017-07- 2017-06- 2017-11- ENREGISTREMENT IDA / 57080 safety net for the poor in Post Consultant Limited 968.56 467.35 Completed 11 02 03 01 09 03 15 04 29 30 BENEFICIAIRES TMDH selected rural areas Selection AMBOHIMAHASOA DRT12CICMP17002 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-07- IDA / 57080 safety net for the poor in Post Consultant Limited 782.16 748.17 Completed enregistrement bénéficiaires 11 10 03 09 12 15 12 29 04 selected rural areas Selection TMDH du District de Faratsiho DRF12CICMP17003 / COMPLEMENTATION Component 1: Building a Individual 2017-04- 2017-05- 2017-05- 2017-05- 2017-05- 2017-06- 2017-05- 2017-07- 2017-06- 2017-11- ENREGISTREMENT IDA / 57080 safety net for the poor in Post Consultant Limited 968.56 464.25 Completed 11 02 03 31 09 23 15 04 29 26 BENEFICIAIRES TMDH selected rural areas Selection AMBOHIMAHASOA DRK12CICMP17002 / Component 1: Building a Individual COMPLEMENTATION 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-07- IDA / 57080 safety net for the poor in Post Consultant Limited 1,016.04 776.19 Completed ENREGISTREMENT TMDH 11 11 03 29 09 30 15 30 29 31 selected rural areas Selection VOHIPENO DRA12CICMP17003 / complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement béneficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 583.03 Completed 11 10 03 28 09 23 15 07 29 14 TMDH Toamasina II et selected rural areas Selection Mahanoro DRA12CICMP17004 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement béneficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 733.54 Completed 11 10 03 28 09 23 15 07 29 14 TMDH ToamasinaII et selected rural areas Selection Mahanoro DRU12CICMP17002 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- IDA / 57080 safety net for the poor in Post Consultant Limited 754.72 565.12 Terminated enregistrement bénéficiaires 11 08 03 20 09 28 15 30 29 selected rural areas Selection TMDH Betioky CI2 DRA12CICMP17005 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement béneficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 648.44 Completed 11 10 03 28 09 23 15 07 29 14 TMDH ToamasinaII et selected rural areas Selection Mahanoto DRU12CICMP17004 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-07- 2017-06- 2017-11- IDA / 57080 safety net for the poor in Post Consultant Limited 754.72 1,067.83 Completed enregistrement bénéficiaires 11 08 03 19 09 28 15 03 29 28 selected rural areas Selection TMDH Betioky CI4 DRA12CICMP17006 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement béneficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 644.57 Completed 11 10 03 28 09 23 15 07 29 14 TMDH Toamasina II et selected rural areas Selection Mahanoro DRU12CICMP17005 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-07- 2017-06- 2017-11- IDA / 57080 safety net for the poor in Post Consultant Limited 754.72 579.33 Completed enregistrement bénéficiaires 11 08 03 20 09 28 15 03 29 27 selected rural areas Selection TMDH Betioky CI5 DRA12CICMP17007 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement bénéficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 666.63 Completed 11 10 03 28 09 23 15 07 29 14 TMDH Toamasina II et selected rural areas Selection Mahanoro DRU12CICMP17003 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-07- 2017-06- 2017-11- IDA / 57080 safety net for the poor in Post Consultant Limited 754.12 757.08 Completed enregistrement bénéficiaires 11 08 03 19 09 28 15 03 29 28 selected rural areas Selection TMDH Betioky CI3 DRA12CICMP17008 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement bénéficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 661.09 Completed 11 10 03 28 09 23 15 07 29 14 TMDH Toamasina II et selected rural areas Selection Mahanoro DRA12CICMP17009 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement bénéficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 642.20 Completed 11 10 03 28 09 23 15 07 29 14 TMDH Toamasina II et selected rural areas Selection Mahanoro DRA12CICMP17010 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement bénéficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 673.07 Completed 11 10 03 27 09 23 15 07 29 14 TMDH Toamasina II et selected rural areas Selection Mahanoro DRA12CICMP17011 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement bénéficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 514.63 Completed 11 10 03 28 09 23 15 07 29 14 TMDH Toamasina II et selected rural areas Selection Mahanoro DRA12CICMP17012 / Complémentation Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- enregistrement bénéficiaire IDA / 57080 safety net for the poor in Post Consultant Limited 645.76 597.96 Completed 11 10 03 27 09 23 15 07 29 14 TMDH Toamasina II et selected rural areas Selection Mahanoro DRK12CICMP17003 / Component 1: Building a Individual COMPLEMENTATION DES 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2020-06- 2017-05- 2017-06- 2017-06- 2017-07- IDA / 57080 safety net for the poor in Post Consultant Limited 1,016.04 1,727.02 Completed BENEFICIAIRES TMDH 11 11 03 29 09 30 15 30 29 31 selected rural areas Selection VOHIPENO DRK12CICMP17004 / Component 1: Building a Individual COMPLEMENTATION 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-07- IDA / 57080 safety net for the poor in Post Consultant Limited 1,016.04 446.31 Completed ENREGISTREMENT TMDH 11 11 03 29 09 30 15 30 29 31 selected rural areas Selection VOHIPENO DRT12CICMP17003 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2018-01- IDA / 57080 safety net for the poor in Post Consultant Limited 782.16 762.67 Completed enregistrement bénéficiaires 11 10 03 09 12 15 12 29 09 selected rural areas Selection TMDH du District de Faratsiho DRT12CICMP17004 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-11- IDA / 57080 safety net for the poor in Post Consultant Limited 782.16 773.52 Completed enregistrement bénéficiaires 11 10 03 09 12 15 12 29 07 selected rural areas Selection TMDH du District de Faratsiho DRT12CICMP17005 / Component 1: Building a Individual Complémentation 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2018-01- IDA / 57080 safety net for the poor in Post Consultant Limited 782.16 751.44 Completed enregistrement bénéficiaires 11 10 03 09 12 15 12 29 04 selected rural areas Selection TMDH du District de Faratsiho DRF12CISAI17001 / SAISIE SUR BASE DE DONNÉES LES Component 1: Building a Individual 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-12- 2018-01- INFORMATIONS SUR LES IDA / 57080 safety net for the poor in Post Consultant Limited 218.75 1,366.22 Completed 18 09 20 15 18 16 24 21 31 16 MÉNAGES BENEFICIAIRES EN selected rural areas Selection TMDH DRF12CISAI17002 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-12- 2018-01- LES INFORMATIONS IDA / 57080 safety net for the poor in Post Consultant Limited 218.75 1,365.16 Completed 18 15 20 30 18 16 24 21 31 16 CONCERNANT LES MÉNAGES selected rural areas Selection BÉNÉFICIAIRES TMDH DRF12CISAI17003 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-12- 2018-01- LES INFORMATIONS IDA / 57080 safety net for the poor in Post Consultant Limited 218.75 1,370.21 Completed 18 09 20 15 18 16 24 21 31 16 CONCERNANT LES MÉNAGES selected rural areas Selection BÉNÉFICIAIRES TMDH DRF11CISAI17001 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-12- 2018-01- LES INFORMATIONS IDA / 57080 safety net for the poor in Post Consultant Limited 218.75 1,353.05 Completed 18 15 20 30 18 16 24 21 31 16 CONCERNANT LES MÉNAGES selected rural areas Selection BÉNÉFICIAIRES ACTP DRF11CISAI17002 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual 2017-04- 2017-05- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-06- 2017-12- 2018-12- LES INFORMATIONS IDA / 57080 safety net for the poor in Post Consultant Limited 218.75 3,089.48 Completed 18 09 20 30 18 16 24 21 31 15 CONCERNANT LES MÉNAGES selected rural areas Selection BÉNÉFICIAIRES ACTP DRF11CISAI17003 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-06- 2017-05- 2017-06- 2017-12- 2018-01- LES INFORMATIONS IDA / 57080 safety net for the poor in Post Consultant Limited 218.75 216.35 Completed 18 09 20 15 18 16 24 21 31 16 CONCERNANT LES MÉNAGES selected rural areas Selection BÉNÉFICIAIRES ACTP DRK12CISAI17001 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual LES INFORMATIONS Under 2017-04- 2019-01- 2017-05- 2019-01- 2017-05- 2017-06- 2017-12- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 0.00 CONCERNANT LES MÉNAGES Implementation 25 10 17 15 27 05 31 selected rural areas Selection BÉNÉFICIAIRES TMDH VOHIPENO DIRK12CISAI17002 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual LES INFORMATIONS Under 2017-04- 2017-05- 2017-05- 2017-06- 2017-06- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 0.00 CONCERNANT LES MÉNAGES Implementation 25 17 27 05 25 selected rural areas Selection BÉNÉFICIAIRES TMDH VOHIPENO DIRK11CISAI17001 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual LES INFORMATIONS 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-06- 2017-12- 2018-12- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 1,009.32 Completed CONCERNANT LES MÉNAGES 25 25 17 20 27 22 05 22 31 21 selected rural areas Selection BÉNÉFICIAIRES ACTP MANAKARA DIRK11CISAI17002 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual DES INFORMATIONS 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-06- 2017-06- 2017-06- 2017-12- 2018-12- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 1,164.60 Completed CONCERNANT LES MÉNAGES 25 25 17 20 27 22 05 22 31 21 selected rural areas Selection BÉNÉFICIAIRES ACTP MANAKARA DRA12CISAI17001 / Saisie des Registres de Component 1: Building a Individual 2017-04- 2017-04- 2017-05- 2017-05- 2017-10- 2017-06- 2017-10- 2018-01- coresponsabilité et Mise à IDA / 57080 safety net for the poor in Post Consultant Limited 1,166.67 416.99 Signed 28 26 20 26 10 01 10 01 jour des données des selected rural areas Selection ménages bénéficiaires sur MIS TMDH. DRA12CISAI17002 / Saisie des registres de Component 1: Building a Individual coresponsabilité et mise à 2017-04- 2017-04- 2017-05- 2017-10- 2017-05- 2017-10- 2017-06- 2017-10- 2017-12- IDA / 57080 safety net for the poor in Post Consultant Limited 1,166.67 416.99 Signed jour des données des 28 26 20 09 26 10 01 10 31 selected rural areas Selection ménages bénéficiaires sur MIS TMDH. DRA12CISAI17003 / Saisie des registres de Component 1: Building a Individual coresponsabilité et mise à 2017-04- 2017-04- 2017-05- 2017-10- 2017-05- 2017-10- 2017-06- 2017-10- 2017-12- IDA / 57080 safety net for the poor in Post Consultant Limited 1,166.67 416.99 Signed jour des données des 28 26 20 09 26 10 01 10 31 selected rural areas Selection ménages bénéficiaires sur MIS TMDH. DRA12CISAI17004 / Saisie des registres de Component 1: Building a Individual coresponsabilité et mise à 2017-04- 2017-04- 2017-05- 2017-10- 2017-05- 2017-10- 2017-06- 2017-10- 2017-12- IDA / 57080 safety net for the poor in Post Consultant Limited 1,166.67 416.99 Signed jour des données des 28 26 20 09 26 10 01 10 31 selected rural areas Selection ménages bénéficiaires sur MIS TMDH. Page 12 DRA12CISAI17005 / Saisie des registres de Component 1: Building a Individual coresponsabilité et mise à 2017-04- 2017-04- 2017-05- 2017-10- 2017-05- 2017-10- 2017-06- 2017-10- 2017-12- IDA / 57080 safety net for the poor in Post Consultant Limited 1,166.67 416.99 Signed jour des données des 28 26 20 09 26 10 01 10 31 selected rural areas Selection ménages bénéficiaires sur MIS TMDH. DRA12CISAI17006 / Saisie des registres de Component 1: Building a Individual coresponsabilité et mise à 2017-04- 2017-04- 2017-05- 2017-10- 2017-05- 2017-10- 2017-06- 2017-10- 2017-12- IDA / 57080 safety net for the poor in Post Consultant Limited 1,166.67 416.99 Signed jour des données des 28 26 20 09 26 10 01 10 31 selected rural areas Selection ménages bénéficiaires sur MIS TMDH. DRA12CISAI17007 / Saisie des registres de Component 1: Building a Individual coresponsabilité et mise à 2017-04- 2017-04- 2017-05- 2017-10- 2017-05- 2017-10- 2017-06- 2017-10- 2017-12- IDA / 57080 safety net for the poor in Post Consultant Limited 1,166.67 416.99 Signed jour des données des 28 26 20 09 26 10 01 10 31 selected rural areas Selection ménages bénéficiaires sur MIS TMDH. DRT11CISAI17001 / Component 1: Building a Individual Opérateur de saisie : saisie 2017-04- 2017-04- 2017-05- 2017-05- 2017-08- 2017-06- 2017-08- 2019-05- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 1,389.96 Terminated des fiches de présence et 27 26 19 30 07 04 23 31 selected rural areas Selection traitement sur MIS DRT11CISAI17002 / Component 1: Building a Individual Opérateur de saisie : saisie 2017-04- 2017-04- 2017-05- 2017-05- 2017-08- 2017-06- 2017-08- 2019-05- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 2,153.63 Completed des fiches de présence et 27 26 19 30 11 04 23 31 23 selected rural areas Selection traitement sur MIS DRT11CISAI17003 / Component 1: Building a Individual Opérateur de saisie : saisie 2017-04- 2017-04- 2017-05- 2017-05- 2017-08- 2017-06- 2017-08- 2019-05- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 3,516.25 Completed des fiches de présence et 27 26 19 30 07 04 23 31 24 selected rural areas Selection traitement sur MIS DRT11CISAI17004 / Component 1: Building a Individual Opérateur de saisie : saisie 2017-04- 2017-04- 2017-05- 2017-05- 2017-08- 2017-06- 2017-08- 2019-05- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 622.96 Terminated des fiches de présence et 27 26 19 30 07 04 23 31 selected rural areas Selection traitement sur MIS DRT11CISAI17005 / Component 1: Building a Individual Opérateur de saisie : saisie 2017-04- 2017-04- 2017-05- 2017-05- 2017-08- 2017-06- 2017-08- 2019-05- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 622.96 Terminated des fiches de présence et 27 26 19 30 10 04 23 31 selected rural areas Selection traitement sur MIS DRT11CISAI17006 / Component 1: Building a Individual Opérateur de saisie : saisie 2017-04- 2017-04- 2017-05- 2017-05- 2017-08- 2017-06- 2017-08- 2019-05- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Limited 2,250.00 4,030.30 Completed des fiches de présence et 27 26 19 30 14 04 23 31 24 selected rural areas Selection traitement sur MIS DRU12CISAI001 / saisie des Component 1: Building a Individual 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2017-07- 2017-08- 2017-07- 2018-01- 2019-10- enregistrement TMDH IDA / 57080 safety net for the poor in Post Consultant Limited 900.00 184.90 Completed 31 08 05 23 27 06 01 10 28 30 opérateur de saisie selected rural areas Selection DRU12CISAI17002 / SAISIE Component 1: Building a Individual 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2017-06- 2017-08- 2017-07- 2018-01- 2019-10- DES ENREGISTREMENTS IDA / 57080 safety net for the poor in Post Consultant Limited 900.00 184.90 Completed 31 09 05 23 27 23 01 07 28 30 TMDH OPERATEUR DE SAISIE selected rural areas Selection DRU12CISAI17003 / Saisie Component 1: Building a Individual 2017-05- 2017-06- 2017-06- 2017-06- 2017-06- 2017-07- 2017-08- 2017-07- 2018-01- 2019-10- des enregistrements TMDH IDA / 57080 safety net for the poor in Post Consultant Limited 900.00 185.18 Completed 31 08 05 23 27 06 01 07 28 30 opérateur de saisie selected rural areas Selection DRU12CISAI17004 / Saisie Component 1: Building a Individual 2017-05- 2017-06- 2017-06- 2017-07- 2017-06- 2017-07- 2017-08- 2017-08- 2018-01- 2019-10- des enregistrements TMDH IDA / 57080 safety net for the poor in Post Consultant Limited 900.00 185.18 Completed 31 09 05 28 27 06 01 07 28 23 opérateur de saisie selected rural areas Selection DRT11CFAGEC17001 / Prise de photos pour les Component 1: Building a 2017-07- 2017-07- 2017-09- 2017-10- cartes des récepteurs et IDA / 57080 safety net for the poor in Post Direct Selection Direct 2,125.40 0.00 Canceled 18 26 01 01 enregistrement en vue de la selected rural areas complémentation des bénéficiaires DRT11CFAGEC17002 / Prise de photos pour les Component 1: Building a cartes des récepteurs et 2017-07- 2017-07- 2017-09- 2017-10- IDA / 57080 safety net for the poor in Post Direct Selection Direct 728.23 0.00 Canceled enregistrement en vue de la 18 26 01 01 selected rural areas complémentation des bénéficiaires (avenant au contrat) DRT11CFAGEC17003 / Prise de photos pour les Component 1: Building a cartes des récepteurs et 2017-07- 2017-07- 2017-09- 2017-10- IDA / 57080 safety net for the poor in Post Direct Selection Direct 1,035.89 0.00 Canceled enregistrement en vue de la 18 26 01 01 selected rural areas complémentation des bénéficiaires (avenant au contrat) DRT11CFAGEC17004 / Prise de photos pour les Component 1: Building a cartes des récepteurs et 2017-07- 2017-07- 2017-09- 2017-10- IDA / 57080 safety net for the poor in Post Direct Selection Direct 861.45 0.00 Canceled enregistrement en vue de la 18 26 01 01 selected rural areas complémentation des bénéficiaires (avenant au contrat) DRT11CFAGEC17005 / Prise de photos pour les Component 1: Building a cartes des récepteurs et 2017-07- 2017-07- 2017-09- 2017-10- IDA / 57080 safety net for the poor in Post Direct Selection Direct 528.39 0.00 Canceled enregistrement en vue de la 18 26 01 01 selected rural areas complémentation des bénéficiaires (avenant au contrat) DRT11CFAGEC17006 / Prise de photos pour les Component 1: Building a cartes des récepteurs et 2017-07- 2017-07- 2017-09- 2017-10- IDA / 57080 safety net for the poor in Post Direct Selection Direct 825.89 0.00 Canceled enregistrement en vue de la 18 26 01 01 selected rural areas complémentation des bénéficiaires (avenant au contrat) DRT11CFAGEC17007 / Prise de photos pour les Component 1: Building a cartes des récepteurs et 2017-07- 2017-07- 2017-09- 2017-10- IDA / 57080 safety net for the poor in Post Direct Selection Direct 1,862.34 0.00 Canceled enregistrement en vue de la 18 26 01 01 selected rural areas complémentation des bénéficiaires (avenant au contrat) DRT11CFAGEC17008 / Prise de photos pour les Component 1: Building a cartes des récepteurs et 2017-07- 2017-07- 2017-09- 2017-10- IDA / 57080 safety net for the poor in Post Direct Selection Direct 872.18 0.00 Canceled enregistrement en vue de la 18 26 01 01 selected rural areas complémentation des bénéficiaires (avenant au contrat) DRT11CFAGEC17009 / Prise de photos pour les Component 1: Building a cartes des récepteurs et 2017-07- 2017-07- 2017-09- 2017-10- IDA / 57080 safety net for the poor in Post Direct Selection Direct 1,067.50 0.00 Canceled enregistrement en vue de la 18 26 01 01 selected rural areas complémentation des bénéficiaires (avenant au contrat) DRT12CISAI17001 / Opérateur de saisie : Component 1: Building a Individual chargé de la saisie des 2017-07- 2017-04- 2017-07- 2017-08- 2017-11- 2017-08- 2017-11- 2019-11- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Limited 3,483.87 5,275.68 Completed données du TMDH sur MIS 18 26 28 22 02 25 06 23 20 selected rural areas Selection (coresponsabilités, mise à jour) DRT12CISAI17002 / Opérateur de saisie : Component 1: Building a Individual chargé de la saisie des 2017-07- 2017-04- 2017-07- 2017-08- 2017-11- 2017-08- 2017-11- 2019-11- IDA / 57080 safety net for the poor in Post Consultant Limited 3,483.87 1,838.22 Terminated données du TMDH sur MIS 18 26 28 22 02 25 06 23 selected rural areas Selection (coresponsabilités, mise à jour) DRT12CISAI17003 / Opérateur de saisie : Component 1: Building a Individual chargé de la saisie des 2017-07- 2017-04- 2017-07- 2017-08- 2017-11- 2017-08- 2017-11- 2019-11- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Limited 3,483.87 5,076.09 Completed données du TMDH sur MIS 18 26 28 22 02 25 06 23 20 selected rural areas Selection (coresponsabilités, mise à jour) DRT12CISAI17004 / Opérateur de saisie : Component 1: Building a Individual chargé de la saisie des 2017-07- 2017-04- 2017-07- 2017-08- 2017-11- 2017-08- 2017-11- 2019-11- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Limited 3,483.87 4,226.01 Completed données du TMDH sur MIS 18 26 28 22 02 25 06 23 20 selected rural areas Selection (coresponsabilités, mise à jour) DRT12CISAI17005 / Opérateur de saisie : Component 1: Building a Individual chargé de la saisie des 2017-07- 2017-04- 2017-07- 2017-08- 2017-11- 2017-08- 2017-11- 2019-11- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Limited 3,483.87 5,275.68 Completed données du TMDH sur MIS 18 26 28 22 02 25 06 23 20 selected rural areas Selection (coresponsabilités, mise à jour) DRT12CISAI17006 / Opérateur de saisie : Component 1: Building a Individual chargé de la saisie des 2017-07- 2017-04- 2017-07- 2017-08- 2017-11- 2017-08- 2017-11- 2019-11- IDA / 57080 safety net for the poor in Post Consultant Limited 3,483.87 1,906.13 Terminated données du TMDH sur MIS 18 26 28 22 02 25 06 23 selected rural areas Selection (coresponsabilités, mise à jour) Component 1: Building a Individual DRP81CISAI17001 / CI 2017-07- 2017-04- 2017-08- 2017-10- 2017-08- 2017-10- 2017-08- 2017-10- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Limited 1,600.00 1,373.00 Signed OPERATEUR DE SAISIE SUD 1 21 27 06 16 14 16 17 17 13 selected rural areas Selection Component 1: Building a Individual DRP81CISAI17002 / CI 2017-07- 2017-04- 2017-08- 2017-12- 2017-08- 2017-12- 2017-08- 2017-12- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Limited 1,600.00 1,373.00 Signed OPERATEUR DE SAISIE SUD 2 21 27 06 07 14 07 17 08 13 selected rural areas Selection Component 1: Building a Individual DRP81CISAI17003 / CI 2017-07- 2017-04- 2017-08- 2017-10- 2017-08- 2017-10- 2017-08- 2017-10- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Limited 1,600.00 1,373.00 Signed OPERATEUR DE SAISIE SUD 3 21 27 06 16 14 16 17 17 13 selected rural areas Selection Component 1: Building a Individual DRP81CISAI17004 / CI 2017-07- 2017-04- 2017-08- 2017-10- 2017-08- 2017-10- 2017-08- 2017-10- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Limited 1,600.00 1,373.00 Signed OPERATEUR DE SAISIE SUD 4 21 27 06 16 14 16 17 17 13 selected rural areas Selection Component 1: Building a Individual DRP81CISAI17005 / CI 2017-07- 2017-04- 2017-08- 2017-10- 2017-08- 2017-10- 2017-08- 2017-10- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Limited 1,600.00 1,373.00 Signed OPERATEUR DE SAISIE SUD 5 21 27 06 16 14 23 17 17 13 selected rural areas Selection DRT12CICIB1701 / Consultant Individuel Socio- Component 1: Building a Individual 2017-11- 2017-11- 2017-11- 2017-12- 2018-01- 2017-12- 2018-01- 2018-02- 2018-07- organisateur chargé de IDA / 57080 safety net for the poor in Post Consultant Limited 2,258.06 2,169.33 Completed 14 16 22 13 16 18 16 06 02 l'enregistrement des selected rural areas Selection bénéficiaires DRT12CICIB1702 / Consultant Individuel Socio- Component 1: Building a Individual 2017-11- 2017-11- 2017-11- 2017-12- 2018-01- 2017-12- 2018-01- 2018-02- 2018-07- organisateur chargé de IDA / 57080 safety net for the poor in Post Consultant Limited 2,258.06 2,174.85 Completed 14 16 22 13 16 18 16 06 02 l'enregistrement des selected rural areas Selection bénéficiaires DRT12CICIB1703 / Consultant Individuel Socio- Component 1: Building a Individual 2017-11- 2017-11- 2017-11- 2017-12- 2018-01- 2017-12- 2018-01- 2018-02- 2018-07- organisateur chargé de IDA / 57080 safety net for the poor in Post Consultant Limited 2,258.06 2,069.77 Completed 14 16 22 13 16 18 16 06 02 l'enregistrement des selected rural areas Selection bénéficiaires DRK12CIACC17001 / Component 1: Building a Individual 2017-11- 2017-09- 2017-12- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-12- 2018-11- ACCOMPAGNATEUR IDA / 57080 safety net for the poor in Post Consultant Open 5,806.45 4,688.91 Completed 22 01 09 03 10 13 12 23 12 23 SPÉCIALISE MANAKARA selected rural areas Selection DRK12CIACC17002 / Component 1: Building a Individual 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-09- 2017-12- 2017-09- 2018-12- 2017-11- ACCOMPAGNATEUR IDA / 57080 safety net for the poor in Post Consultant Open 5,806.45 754.33 Completed 22 01 09 25 10 26 12 26 12 27 SPÉCIALISE MANAKARA selected rural areas Selection DRK12CIACC17003 / Component 1: Building a Individual 2017-11- 2017-09- 2017-12- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-12- 2018-11- ACCOMPAGNATEUR IDA / 57080 safety net for the poor in Post Consultant Open 5,806.45 4,911.34 Completed 22 22 09 03 10 13 12 23 12 23 SPÉCIALISE MANAKARA selected rural areas Selection DRK12CICMP17005 / Component 1: Building a Individual CIBLAGE - ENQUÊTE - 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Open 343.75 297.94 Completed ENREGISTREMENT 23 23 10 15 11 04 13 15 12 15 selected rural areas Selection BÉNÉFICIAIRES MANAKARA DRK12CICMP17006 / Component 1: Building a Individual 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-05- CIBLAGE - ENQUÊTE - IDA / 57080 safety net for the poor in Post Consultant Open 196.88 988.87 Completed 23 23 10 12 11 04 13 15 12 30 ENREGISTREMENT selected rural areas Selection MANAKARA DRK12CICMP17007 / Component 1: Building a Individual CIBLAGE - ENQUÊTE - 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Open 196.88 1,205.68 Completed ENREGISTREMENT 23 23 10 20 11 12 13 15 12 15 selected rural areas Selection BÉNÉFICIAIRES MANAKARA DRK12CICMP17008 / Component 1: Building a Individual CIBLAGE - ENQUÊTE - 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- IDA / 57080 safety net for the poor in Post Consultant Open 196.88 0.00 Canceled ENREGISTREMENT 23 23 10 11 13 12 selected rural areas Selection BÉNÉFICIAIRES MANAKARA DRK12CICMP17009 / Component 1: Building a Individual CIBLAGE - ENQUÊTE - 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Open 196.88 960.92 Completed ENREGISTREMENT 23 23 10 15 11 04 13 15 12 15 selected rural areas Selection BÉNÉFICIAIRES MANAKARA DRK12CICMP17010 / Component 1: Building a Individual CIBLAGE - ENQUÊTE - 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Open 196.88 294.83 Completed ENREGISTREMENT 23 23 10 15 11 04 13 15 12 15 selected rural areas Selection BÉNÉFICIAIRES MANAKARA DRK12CICMP17011 / Component 1: Building a Individual CIBLAGE - ENQUÊTE - 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Open 196.88 742.04 Completed ENREGISTREMENT 23 23 10 15 11 04 13 15 12 15 selected rural areas Selection BÉNÉFICIAIRES MANAKARA DRK12CICMP17012 / Component 1: Building a Individual CIBLAGE - ENQUÊTE - 2017-11- 2017-11- 2017-12- 2017-12- 2017-12- 2018-01- IDA / 57080 safety net for the poor in Post Consultant Open 196.88 0.00 Canceled ENREGISTREMENT 23 23 10 11 13 12 selected rural areas Selection BÉNÉFICIAIRES MANAKARA DRK12CICMP17013 / Component 1: Building a Individual CIBLAGE - ENQUÊTE - 2017-11- 2017-11- 2017-12- 2018-01- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- IDA / 57080 safety net for the poor in Post Consultant Open 196.88 4,139.68 Completed ENREGISTREMENT 23 23 10 05 11 05 13 19 12 28 selected rural areas Selection BÉNÉFICIAIRES MANAKARA DRU12CISAI17005 / Component 1: Building a Individual 2017-11- 2017-12- 2017-12- 2018-01- 2019-01- opérateur de saisie IDA / 57080 safety net for the poor in Post Consultant Open 900.00 0.00 Canceled 28 23 28 02 02 novembre 01 selected rural areas Selection DRU12CISAI17006 / Component 1: Building a Individual 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- opérateur de saisie IDA / 57080 safety net for the poor in Post Consultant Open 900.00 0.00 Canceled 28 23 28 02 05 novembre 02 selected rural areas Selection DRU12CICMP17006 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 508.43 Signed 30 10 20 07 07 18 10 10 17 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17007 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 586.15 Signed 29 10 19 07 06 18 09 10 16 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP7008 / TMDH CISO ciblage, enquête, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- enregistrement bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Open 210.00 785.65 Signed 29 10 19 07 06 18 09 10 16 nouvelles communes selected rural areas Selection novembe 01 DRU12CICMP17009 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 793.60 Signed 29 10 19 07 06 18 09 10 16 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17010 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 640.52 Signed 29 10 19 07 06 18 09 10 16 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17011 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- 2018-05- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 720.97 Completed 29 10 19 07 06 18 09 10 16 28 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17012 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- 2018-05- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 660.44 Completed 29 10 19 07 06 18 09 10 16 25 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17013 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 675.03 Signed 29 10 19 07 06 18 09 10 16 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17014 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 673.26 Signed 29 10 19 05 06 09 09 10 16 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17015 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 722.85 Signed 29 10 19 15 06 17 09 18 16 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17016 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 845.13 Signed 29 10 19 15 06 17 09 18 16 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 Page 13 DRU12CICMP17017 / TMDH CISO ciblage, Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2018-01- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- enquête, enregistrement IDA / 57080 safety net for the poor in Post Consultant Open 210.00 740.81 Signed 29 10 19 15 06 17 09 18 16 bénéficiaires nouvelles selected rural areas Selection communes novembre 01 DRU12CICMP17018 / TMDH CI Chef d'Equipe Component 1: Building a Individual 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- ciblage, enquête, IDA / 57080 safety net for the poor in Post Consultant Open 366.67 538.34 Terminated 29 10 19 07 06 18 09 10 16 enregistrement bénéficiaires selected rural areas Selection nouvelles communes novembre 01 DRU12CICMP17019 / TMDH CI Chef d'Equipe Component 1: Building a Individual ciblage,enquête, 2017-11- 2017-04- 2017-12- 2017-12- 2018-01- 2017-12- 2018-01- 2018-01- 2018-02- 2018-06- IDA / 57080 safety net for the poor in Post Consultant Open 366.67 1,275.09 Completed enregistrement bénéficiaires 29 10 19 07 06 18 09 10 16 11 selected rural areas Selection nouvelles communes novembre 01 DRU12CIACC17001 / Component 1: Building a Individual TMDH Accompagnateur 2017-11- 2017-09- 2017-12- 2017-11- 2018-01- 2017-11- 2018-01- 2018-01- 2019-01- IDA / 57080 safety net for the poor in Post Consultant Open 7,000.00 6,069.11 Signed Spécialisé nouvelles 29 20 19 07 06 16 09 03 09 selected rural areas Selection communes novembre 01 DRU12CIACC17002 / Component 1: Building a Individual 2017-12- 2018-01- 2018-02- 2018-03- 2018-08- TMDH CI Marché multiple IDA / 57080 safety net for the poor in Post Consultant Open 2,600.00 0.00 Canceled 10 22 12 01 28 novembre 01 selected rural areas Selection DRA12CIACC17002 / Component 1: Building a Individual ACCOMPAGNATEUR 2017-11- 2017-09- 2017-12- 2018-02- 2017-12- 2018-02- 2017-12- 2018-02- 2018-12- IDA / 57080 safety net for the poor in Post Consultant Open 8,360.91 5,238.95 Signed SPECIALISE DISTRICT 20 22 07 02 08 06 10 14 10 selected rural areas Selection TOAMASINA II DRA12CIACC18001 / Component 1: Building a Individual 2018-01- 2017-09- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-12- ACCOMPAGNATEUR IDA / 57080 safety net for the poor in Post Consultant Open 8,360.91 5,053.55 Signed 17 20 01 02 03 14 06 14 31 SPECIALISE selected rural areas Selection DRT11CIANIM1801 / Component 1: Building a Individual Consultant Individuel 2018-01- 2018-02- 2018-02- 2018-02- 2018-12- IDA / 57080 safety net for the poor in Post Consultant Open 3,735.48 0.00 Canceled animateur de l'ACTP ans les 17 06 13 24 03 selected rural areas Selection 18 UTB à Antanifotsy. DRT12CIACC1801 / Consultant Individuel chargé du renforcement de capacité Component 1: Building a Individual des Mères Leaders et des 2018-02- 2018-04- 2018-03- 2018-04- 2018-06- 2018-04- 2018-06- 2019-04- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 6,397.85 7,203.01 Completed accompagnements des 20 06 31 05 11 09 13 30 20 selected rural areas Selection Espaces de bien-être du projet de Protection Sociale du FID (Accompagnateur) BETAFO 1 DRT12CIACC1802 / Consultant Individuel chargé du renforcement de capacité Component 1: Building a Individual des Mères Leaders et des 2018-02- 2018-04- 2018-03- 2018-04- 2018-06- 2018-04- 2018-06- 2019-04- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 6,397.85 7,352.71 Completed accompagnements des 20 06 31 05 11 09 13 30 20 selected rural areas Selection Espaces de bien-être du projet de Protection Sociale du FID (Accompagnateur) BETAFO 2 DRT12CIACC1803 / Consultant Individuel chargé du renforcement de capacité Component 1: Building a Individual des Mères Leaders et des 2018-02- 2018-04- 2018-03- 2018-04- 2018-06- 2018-04- 2018-06- 2019-04- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 6,397.85 8,294.02 Completed accompagnements des 20 06 31 05 11 09 13 30 20 selected rural areas Selection Espaces de bien-être du projet de Protection Sociale du FID (Accompagnateur) BETAFO 3 Component 2: DG20CFFTOM1808 / Strengthening safety net 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- Formation des RSE en IDA / 57080 Post Direct Selection Direct 743.37 741.77 Completed administration, monitoring 01 05 08 08 14 16 24 19 Logiciel TOMPORTAIL and social accountability DG20CFLOGRH1812 / Component 2: Conception Logiciel pour la Strengthening safety net 2018-01- 2017-11- 2018-01- 2017-11- 2018-02- 2018-02- 2018-03- IDA / 57080 Post Direct Selection Direct 20,685.35 20,584.06 Signed gestion des Ressources administration, monitoring 30 03 30 13 09 26 11 Humaines and social accountability DRF12CIAS17001 / ACCOMPAGNATEUR Component 1: Building a Individual 2018-01- 2017-09- 2018-02- 2017-11- 2018-02- 2017-11- 2018-02- 2017-11- 2019-02- 2019-10- SPECIALISE POUR : CU IDA / 57080 safety net for the poor in Post Consultant Open 7,722.66 6,578.73 Completed 30 20 12 08 14 07 19 15 14 14 AMBOHIMAHASOA - CR selected rural areas Selection MORAFENO - CR BEFETA Component 2: Individual DG20CIFSQL1810 / Strengthening safety net 2018-05- 2019-04- 2018-05- 2019-05- 2018-06- 2019-05- 2018-07- 2019-05- 2018-07- 2019-06- IDA / 57080 Post Consultant Limited 743.37 581.17 Completed Formation des RSE en SQL administration, monitoring 15 03 20 08 10 13 15 16 30 11 Selection and social accountability DRA12CIACC17001 / Component 1: Building a Individual ACCOMPAGNATEUR 2017-11- 2017-09- 2017-12- 2018-01- 2017-12- 2018-01- 2017-12- 2018-01- 2018-12- IDA / 57080 safety net for the poor in Post Consultant Open 8,360.91 5,275.89 Terminated SPÉCIALISE DISTRICT 20 20 07 15 08 17 10 26 10 selected rural areas Selection MAHANORO DRT12CICIB1704 / Consultant individuel Socio- Component 1: Building a Individual 2018-03- 2017-11- 2018-03- 2018-03- 2018-01- 2018-04- 2018-01- 2018-05- 2018-07- organisateur chargé de IDA / 57080 safety net for the poor in Post Consultant Limited 2,258.06 2,187.89 Completed 14 16 14 30 15 02 16 22 02 l'enregistrement des selected rural areas Selection bénéficiaires DRT12CICIB1705 / Consultant individuel Socio- Component 1: Building a Individual 2018-03- 2017-11- 2018-03- 2018-03- 2018-01- 2018-04- 2018-01- 2018-05- 2018-07- organisateur chargé de IDA / 57080 safety net for the poor in Post Consultant Limited 2,258.06 1,934.14 Completed 14 16 14 30 15 02 16 22 02 l'enregistrement des selected rural areas Selection bénéficiaires DRK11CISAI18001 / SAISI DES DONNÉES DANS LE MIS Component 1: Building a Individual 2018-03- 2018-03- 2018-04- 2018-05- 2018-04- 2018-05- 2018-04- 2018-05- 2018-10- 2018-12- CONCERNANT LES MÉNAGES IDA / 57080 safety net for the poor in Post Consultant Open 2,419.37 1,408.72 Completed 15 15 14 02 17 16 21 22 18 31 BÉNÉFICIAIRES ACTP selected rural areas Selection MANAKARA DRK12CISAI18002 / SAISI Component 1: Building a Individual DES DONNÉES DANS LE MIS Under 2018-03- 2018-04- 2018-04- 2018-04- 2018-10- IDA / 57080 safety net for the poor in Post Consultant Open 2,419.35 0.00 DES BÉNÉFICIAIRES TMDH Implementation 15 14 17 21 18 selected rural areas Selection VOHIPENO DRP81CIOS18001 / CI Component 1: Building a Individual 2018-04- 2018-03- 2018-04- 2018-03- 2018-05- 2018-03- 2018-05- 2018-03- 2018-12- OPERATEUR DE SAISIE IDA / D1450 safety net for the poor in Post Consultant Limited 2,000.00 278.50 Terminated 24 08 24 19 09 19 11 22 31 SUD18 1 selected rural areas Selection DRP81CIOS18002 / CI Component 1: Building a Individual 2018-04- 2018-03- 2018-04- 2018-03- 2018-05- 2018-03- 2018-05- 2018-03- 2018-12- OPERATEUR DE SAISIE IDA / D1450 safety net for the poor in Post Consultant Limited 2,000.00 1,847.81 Signed 24 08 24 21 09 21 11 22 31 SUD18 2 selected rural areas Selection DRP81CIOS18003 / CI Component 1: Building a Individual 2018-04- 2018-03- 2018-04- 2018-03- 2018-05- 2018-03- 2018-05- 2018-03- 2018-12- OPERATEUR DE SAISIE IDA / D1450 safety net for the poor in Post Consultant Limited 2,000.00 1,847.81 Signed 24 08 24 21 09 21 11 22 31 SUD18 3 selected rural areas Selection DRP81CIOS18004 / CI Component 1: Building a Individual 2018-04- 2018-03- 2018-04- 2018-03- 2018-05- 2018-03- 2018-05- 2018-03- 2018-12- OPERATEUR DE SAISIE IDA / D1450 safety net for the poor in Post Consultant Limited 2,000.00 1,847.81 Signed 24 08 24 21 09 21 11 22 31 SUD18 4 selected rural areas Selection DRP81CIOS18005 / CI Component 1: Building a Individual 2018-04- 2018-03- 2018-04- 2018-03- 2018-05- 2018-03- 2018-05- 2018-03- 2018-12- OPERATEUR DE SAISIE IDA / D1450 safety net for the poor in Post Consultant Limited 2,000.00 1,847.81 Signed 24 08 24 21 09 21 11 22 31 SUD18 5 selected rural areas Selection DRP81CIOS18006 / CI Component 1: Building a Individual 2018-04- 2018-03- 2018-04- 2018-03- 2018-05- 2018-03- 2018-05- 2018-03- 2018-12- OPERATEUR DE SAISIE IDA / D1450 safety net for the poor in Post Consultant Limited 2,000.00 1,847.81 Signed 24 08 24 21 09 21 11 22 31 SUD18 6 selected rural areas Selection DRT12CIACC1804 / Consultant Individuel chargé du renforcement de capacité Component 1: Building a Individual des Mères Leaders et des 2018-04- 2018-04- 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-06- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 7,741.94 7,242.05 Completed accompagnements des 25 06 18 23 11 05 13 30 20 selected rural areas Selection Espaces de bien-être du projet de Protection Sociale du FID (Accompagnateur) BETAFO 4 DRT12CIACC1805 / Renforcements de capacité des Mères Leaders et des Component 1: Building a Individual 2018-04- 2018-04- 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-06- 2019-09- accompagnements des IDA / 57080 safety net for the poor in Post Consultant Open 7,741.94 7,471.95 Completed 26 06 18 23 11 05 13 30 18 Espaces de bien-être du selected rural areas Selection projet de Protection Sociale du FID (Accompagnateur) BETAFO 5 DRT12CIACC1806 / Renforcements de capacité des Mères Leaders et des Component 1: Building a Individual 2018-04- 2018-04- 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-06- 2019-09- accompagnements des IDA / 57080 safety net for the poor in Post Consultant Open 7,741.94 7,391.76 Completed 26 06 18 23 11 05 13 30 16 Espaces de bien-être du selected rural areas Selection projet de Protection Sociale du FID (Accompagnateur) BETAFO 6 DRT12CIACC1807 / Renforcements de capacité des Mères Leaders et des Component 1: Building a Individual 2018-04- 2018-04- 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-06- 2019-09- accompagnements des IDA / 57080 safety net for the poor in Post Consultant Open 7,741.94 6,975.81 Completed 26 06 18 23 11 05 13 30 20 Espaces de bien-être du selected rural areas Selection projet de Protection Sociale du FID (Accompagnateur) BETAFO 7 DRT12CIACC1808 / Renforcements de capacité des Mères Leaders et des Component 1: Building a Individual 2018-04- 2018-04- 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-06- 2019-09- accompagnements des IDA / 57080 safety net for the poor in Post Consultant Open 7,741.94 7,457.16 Completed 26 06 18 23 11 05 13 30 20 Espaces de bien-être du selected rural areas Selection projet de Protection Sociale du FID (Accompagnateur) BETAFO 8 DRF12CISAI17004 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a Individual 2018-04- 2018-04- 2018-05- 2018-05- 2018-12- LES INFORMATIONS IDA / 57080 safety net for the poor in Post Consultant Limited 218.75 0.00 Canceled 27 29 09 12 19 CONCERNANT LES MÉNAGES selected rural areas Selection BÉNÉFICIAIRES TMDH DRT11CIASS1801 / Recrutement de consultant individuel accompagnateur Component 1: Building a Individual spécialisé pour la mise en 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-08- 2019-10- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 8,225.80 6,013.54 Completed œuvre du développement de 05 11 27 09 06 10 13 13 13 27 selected rural areas Selection la petite enfance intensifié et l'éducation des ménages du programme ACTP DRT11CIASS1802 / Recrutement de consultant individuel accompagnateur Component 1: Building a Individual spécialisé pour la mise en 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-08- 2019-05- IDA / 57080 safety net for the poor in Post Consultant Open 5,483.80 5,093.52 Terminated œuvre du développement de 05 11 27 09 06 10 13 13 13 selected rural areas Selection la petite enfance intensifié et l'éducation des ménages du programme ACTP DRT11CIASS1803 / Recrutement de consultant individuel accompagnateur Component 1: Building a Individual spécialisé pour la mise en 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-08- 2019-05- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 5,483.80 8,730.42 Completed œuvre du développement de 05 11 27 09 06 10 13 13 13 27 selected rural areas Selection la petite enfance intensifié et l'éducation des ménages du programme ACTP DRT11CIASS1804 / Recrutement de consultant individuel accompagnateur Component 1: Building a Individual spécialisé pour la mise en 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-08- 2019-05- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 5,483.80 5,694.30 Completed œuvre du développement de 05 11 27 09 06 10 13 13 13 27 selected rural areas Selection la petite enfance intensifié et l'éducation des ménages du programme ACTP DRT11CISUP18001 / Mise à Component 1: Building a Individual jour PAMO et supervision 2018-06- 2018-06- 2018-06- 2018-06- 2018-08- 2018-06- 2018-08- 2019-06- IDA / 57080 safety net for the poor in Post Consultant Limited 7,612.90 1,376.60 Terminated des travaux dans 6 UTB 07 11 12 19 16 25 29 30 selected rural areas Selection ACTP à Antanifotsy DRT11CISEC18001 / Mise Component 1: Building a Individual en œuvre du suivi 2018-06- 2018-06- 2018-06- 2018-08- 2018-06- 2018-08- 2018-06- 2018-08- 2019-06- 2019-06- IDA / 57080 safety net for the poor in Post Consultant Limited 2,022.58 2,243.52 Completed évaluation communautaire 07 11 12 14 19 22 25 29 30 18 selected rural areas Selection (SEC) sur 6 UTB de l'ACTP à Antanifotsy DRA12CIASS18003 / ACCOMPAGNEMENT Component 1: Building a Individual 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-08- 2019-10- BENEFICIARES - ACTIVITES IDA / 57080 safety net for the poor in Post Consultant Open 8,225.80 6,121.82 Signed 05 11 27 07 06 07 13 30 06 DE SENSIBILISATION - MISE selected rural areas Selection EN ŒUVRE DPE ET EP DRA12CIASS18004 / ACCOMPAGNEMENT Component 1: Building a Individual 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-08- 2019-05- BENEFICIARES - ACTIVITES IDA / 57080 safety net for the poor in Post Consultant Open 5,483.87 5,509.85 Signed 05 11 27 07 06 07 13 30 14 DE SENSIBILISATION - MISE selected rural areas Selection EN ŒUVRE DPE ET EP DRA12CIPAMO18005 / MISE A JOUR PAMO ET Component 1: Building a Individual 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2019-06- SUPERVISIONS DES TRAVAUX IDA / 57080 safety net for the poor in Post Consultant Limited 6,106.45 5,310.61 Signed 05 11 10 29 17 03 23 14 28 DANS 06 UTB ACT P selected rural areas Selection DISTRICT DE VATOMANDRY DRA12CIPAMO18006 / MISE A JOUR PAMO ET Component 1: Building a Individual 2018-06- 2018-08- 2018-06- 2018-09- 2018-06- 2018-10- 2018-06- 2018-10- 2019-06- SUPERVISION DES TRAVAUX IDA / 57080 safety net for the poor in Post Consultant Limited 6,106.45 3,588.37 Terminated 06 30 11 28 18 01 24 24 29 DANS 06 UTB ACT P selected rural areas Selection DISTRICT DE VATOMANDRY DRA12CISEC18007 / MISE Component 1: Building a Individual EN ŒUVRE DE SUIVI 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2019-06- IDA / 57080 safety net for the poor in Post Consultant Limited 2,021.61 1,719.81 Terminated EVALUATION 06 11 11 29 18 04 24 22 29 selected rural areas Selection COMMUNAUTAIRE ( SEC) dans 04 UTB ACT P VATOMANDRY DRA12CISEC18008 / MISE Component 1: Building a Individual EN ŒUVRE DE SUIVI 2018-06- 2018-06- 2018-06- 2018-10- 2018-06- 2018-10- 2018-06- 2018-10- 2019-06- IDA / 57080 safety net for the poor in Post Consultant Limited 2,021.61 1,170.60 Terminated EVALUATION 06 11 11 01 18 02 24 24 29 selected rural areas Selection COMMUNAUTAIRE ( SEC) dans 04 UTB ACT P VATOMANDRY DRA12CISEC1809 / MISE EN Component 1: Building a Individual ŒUVRE DE SUIVI 2018-06- 2018-08- 2018-06- 2018-09- 2018-06- 2018-10- 2018-06- 2018-10- 2019-06- IDA / 57080 safety net for the poor in Post Consultant Limited 2,021.61 1,152.51 Signed EVALUATION 06 30 11 28 18 02 24 24 29 selected rural areas Selection COMMUNAUTAIRE ( SEC) dans 04 UTB ACT P VATOMANDRY DRA12CISAI18001 / MISE A JOURS INFORMATIONS DES Component 1: Building a Individual BÉNÉFICIAIRES ET SAISI DE 2018-06- 2018-06- 2018-06- 2018-06- 2019-06- IDA / 57080 safety net for the poor in Post Consultant Limited 1,935.48 0.00 Canceled FICHE DE PRÉSENCE DES 06 11 18 29 29 selected rural areas Selection TRAVAILLEURS ACTP DISTRICT VATOMANDRY DRA12CISAI18002 / MISE A JOURS INFORMATIONS DES Component 1: Building a Individual BÉNÉFICIAIRES ET SAISI DE 2018-06- 2018-06- 2018-06- 2018-11- 2018-06- 2018-11- 2018-06- 2018-11- 2019-06- IDA / 57080 safety net for the poor in Post Consultant Limited 1,935.48 209.67 Signed FICHE DE PRESENCE DES 06 06 11 08 18 12 29 26 29 selected rural areas Selection TRAVAILLEURS ACTP DISTRICT VATOMANDRY DRF11CIAS18001 / RECRUTEMENT DE CONSULTANT INDIVIDUEL ACCOMPAGNATEUR Component 1: Building a Individual SPÉCIALISÉ POUR LA MISE EN 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-06- 2019-10- IDA / 57080 safety net for the poor in Post Consultant Open 5,483.87 6,135.30 Completed ŒUVRE DU DÉVELOPPEMENT 11 08 24 23 26 03 01 06 26 07 selected rural areas Selection DE LA PETITE ENFANCE INTENSIFIÉ ET L'ÉDUCATION DES MÉNAGES DU PROGRAMME ACTP 01 DRF11CIAS18002 / RECRUTEMENT DE CONSULTANT INDIVIDUEL ACCOMPAGNATEUR Component 1: Building a Individual SPÉCIALISÉ POUR LA MISE EN 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-06- 2019-10- IDA / 57080 safety net for the poor in Post Consultant Open 5,483.87 6,126.12 Completed ŒUVRE DU DÉVELOPPEMENT 11 08 24 23 26 03 01 06 26 07 selected rural areas Selection DE LA PETITE ENFANCE INTENSIFIÉ ET L'ÉDUCATION DES MÉNAGES DU PROGRAMME ACTP02 DRF11CIAS18003 / RECRUTEMENT DE CONSULTANT INDIVIDUEL ACCOMPAGNATEUR Component 1: Building a Individual SPÉCIALISÉ POUR LA MISE EN 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-09- 2019-10- IDA / 57080 safety net for the poor in Post Consultant Open 8,225.81 6,135.30 Completed ŒUVRE DU DÉVELOPPEMENT 11 08 24 23 26 03 01 06 24 04 selected rural areas Selection DE LA PETITE ENFANCE INTENSIFIÉ ET L'ÉDUCATION DES MÉNAGES DU PROGRAMME ACTP03 Component 2: DG20CFFTOMAF1810 / Strengthening safety net 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-07- FORMATION RECYCLAGE EN IDA / 57080 Post Direct Selection Direct 700.00 564.21 Completed administration, monitoring 11 11 14 19 25 29 10 11 TOM2PRO EQUIPE SAF and social accountability DG20CICOMMDPEI1811 / CONSULTANT EN Component 1: Building a Individual COMMUNICATION DANS LES 2018-06- 2018-07- 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-07- 2019-01- 2018-12- IDA / 57080 safety net for the poor in Post Consultant Open 13,859.00 39,582.66 Completed MESURES 06 09 29 10 01 16 05 16 01 28 selected rural areas Selection D'ACCOMPAGNEMENT DES TRANSFERTS MONETAIRES DRK11CIAS18001 / RECRUTEMENT Component 1: Building a Individual ACCOMPAGNATEUR Pending 2018-06- 2018-06- 2018-06- 2018-06- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 8,225.67 0.00 SPÉCIALISÉ DE Implementation 07 24 25 27 20 selected rural areas Selection SENSIBILISATION ACTP MANAKARA DRK11CIAS18002 / RECRUTEMENT Component 1: Building a Individual ACCOMPAGNATEUR Pending 2018-06- 2018-06- 2018-06- 2018-06- 2019-04- IDA / 57080 safety net for the poor in Post Consultant Open 5,483.78 0.00 SPÉCIALISÉ DE Implementation 07 24 25 27 23 selected rural areas Selection SENSIBILISATION ACTP MANAKARA Page 14 DRK11CIAS18003 / RECRUTEMENT Component 1: Building a Individual ACCOMPAGNATEUR Under 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2019-04- IDA / 57080 safety net for the poor in Post Consultant Open 5,483.78 0.00 SPÉCIALISÉ DE Implementation 07 11 24 25 27 23 selected rural areas Selection SENSIBILISATION ACTP MANAKARA DRK11CIAS18004 / RECRUTEMENT Component 1: Building a Individual ACCOMPAGNATEUR Pending 2018-06- 2018-06- 2018-06- 2018-06- 2019-04- IDA / 57080 safety net for the poor in Post Consultant Open 5,483.78 0.00 SPÉCIALISÉ DE Implementation 07 24 25 27 23 selected rural areas Selection SENSIBILISATION ACTP MANAKARA DRU12CIASS18001 / Recrutement de consultant individuel accompagnateur Component 1: Building a Individual spécialisé pour la mise en 2018-06- 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2018-07- 2018-08- 2019-10- IDA / 57080 safety net for the poor in Post Consultant Open 8,226.00 6,088.70 Signed œuvre du développement de 07 11 29 31 08 02 15 31 08 selected rural areas Selection la petite enfance intensifié et l'éducation des ménages du programme ACTP DRU12CIASS18002 / Recrutement de consultant Component 1: Building a Individual 2018-06- 2018-06- 2018-06- 2018-09- 2018-07- 2018-09- 2018-07- 2018-09- 2019-05- individuel accompagnateur IDA / 57080 safety net for the poor in Post Consultant Open 5,484.00 5,794.39 Signed 07 11 29 10 08 13 15 28 16 spécialisé pour la suivi des selected rural areas Selection sensibilisations Component 2: DG20CIFORMGOUV1812 / Individual Strengthening safety net 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-07- 2018-07- Formation en Gouvernance IDA / 57080 Post Consultant Limited 120.00 503.16 Completed administration, monitoring 07 11 12 18 30 22 07 28 22 31 citoyenne Selection and social accountability Component 2: DG20CFFORMAUD1813 / Strengthening safety net 2018-10- 2018-10- 2018-11- 2018-11- FORMATION EN AUDIT IDA / 57080 Post Direct Selection Direct 300.00 0.00 Canceled administration, monitoring 01 11 05 20 INTERNE and social accountability Component 2: DG20CFFORMPERMA1816 / Strengthening safety net 2018-06- 2018-09- 2018-06- 2018-11- 2018-07- 2018-12- 2018-08- 2018-12- FORMATION EN IDA / 57080 Post Direct Selection Direct 1,489.00 1,242.33 Completed administration, monitoring 17 21 24 06 17 04 01 05 PERMACULTURE and social accountability Component 2: DG20CFFORMEDACT1817 / Strengthening safety net 2018-06- 2018-10- 2018-06- 2018-11- 2018-07- 2018-11- 2018-08- 2018-11- FORMATION EN METHODE IDA / 57080 Post Direct Selection Direct 2,977.00 2,201.70 Completed administration, monitoring 17 22 24 05 17 23 01 27 D'EDUCATION ACTIVE and social accountability DRA12CISAI18010 / Component 1: Building a Individual OPERATEUR DE SAISIE DES 2018-06- 2018-06- 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-08- 2018-12- IDA / 57080 safety net for the poor in Post Consultant Limited 967.74 550.58 Signed DONNES SUR MIS MENAGES 18 20 23 21 30 22 11 30 31 selected rural areas Selection BENEFICIAIRES TMDH DRU12CIASDPEI18001 / Recrutement de consultant Component 1: Building a Individual 2018-07- 2018-07- 2018-08- 2018-08- 2018-08- 2018-09- 2018-09- 2018-09- 2018-09- individuel accompagnateur IDA / 57080 safety net for the poor in Post Consultant Open 4,500.00 5,234.89 Signed 20 18 16 30 25 03 02 13 12 spécialisé pour les activités selected rural areas Selection de DPEI TMDH DRT12CIASS1801 / Recrutement de consultant individuel accompagnateur Component 1: Building a Individual spécialisé pour la mise en 2018-07- 2018-07- 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-09- 2019-08- 2019-09- IDA / 57080 safety net for the poor in Post Consultant Open 5,806.45 6,308.57 Completed œuvre du développement de 21 19 14 06 27 05 31 06 31 20 selected rural areas Selection la petite enfance intensifié et l'éducation des ménages du programme TMDH DRT12CIASS1802 / Recrutement de consultant individuel accompagnateur Component 1: Building a Individual spécialisé pour la mise en 2018-07- 2018-08- 2018-08- 2018-08- 2019-08- IDA / 57080 safety net for the poor in Post Consultant Open 5,806.45 0.00 Canceled œuvre du développement de 21 14 27 31 31 selected rural areas Selection la petite enfance intensifié et l'éducation des ménages du programme TMDH DRK12CIAS18001 / Component 1: Building a Individual Under 2018-07- 2017-04- 2018-08- 2018-08- 2018-08- 2019-08- ACCOMPAGNATEUR IDA / 57080 safety net for the poor in Post Consultant Open 5,625.00 0.00 Implementation 23 26 09 10 12 12 SPECIALISE DPEI_1 selected rural areas Selection DRK12CIAS18002 / Component 1: Building a Individual Under 2018-07- 2018-04- 2018-08- 2018-08- 2018-08- 2019-08- ACCOMPAGNATEUR IDA / 57080 safety net for the poor in Post Consultant Open 5,625.00 0.00 Implementation 23 26 09 10 12 12 SPECIALISE DPEI_2 selected rural areas Selection DRU11CICI18004 / ACTP Component 1: Building a Individual CISO Ciblage à l'intégration 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-10- 2018-09- 2018-10- 2018-10- IDA / 57080 safety net for the poor in Post Consultant Open 2,140.10 815.78 Signed des nouveaux ménages 02 09 22 20 27 01 03 26 08 selected rural areas Selection dans le district d'Ankazoabo DRU11CICI18003 / ACTP Component 1: Building a Individual CISO Ciblage à l'intégration 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-10- 2018-09- 2018-10- 2018-10- IDA / 57080 safety net for the poor in Post Consultant Open 2,140.10 709.19 Signed des nouveaux ménages 02 09 22 20 27 01 03 26 08 selected rural areas Selection dans le district d'Ankazoabo DRU11CICI18005 / ACTP Component 1: Building a Individual CISO Ciblage à l'intégration 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-10- 2018-09- 2018-10- 2018-10- IDA / 57080 safety net for the poor in Post Consultant Open 2,140.10 710.70 Signed des nouveaux ménages 02 09 22 20 27 01 03 26 08 selected rural areas Selection dans le district d'Ankazoabo DRU11CICI18006 / ACTP Component 1: Building a Individual CISO Ciblage à l'intégration 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-10- 2018-09- 2018-10- 2018-10- IDA / 57080 safety net for the poor in Post Consultant Open 2,140.10 687.52 Signed des nouveaux ménages 02 09 22 20 27 01 03 26 08 selected rural areas Selection dans le district d'Ankazoabo DRU11CICI18007 / ACTP Component 1: Building a Individual CISO Ciblage à l'intégration 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-10- 2018-09- 2018-10- 2018-10- IDA / 57080 safety net for the poor in Post Consultant Open 2,140.10 826.57 Signed des nouveaux ménages 02 09 22 28 27 01 03 26 08 selected rural areas Selection dans le district d'Ankazoabo DRU11CICI18008 / ACTP CI Chef d'équipe Ciblage à Component 1: Building a Individual 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-10- 2018-09- 2018-10- 2018-10- l'intégration des nouveaux IDA / 57080 safety net for the poor in Post Consultant Open 3,009.51 1,306.52 Signed 02 09 22 20 27 01 03 26 08 ménages dans le district selected rural areas Selection d'Ankazoabo DRT11CICIB1801 / Consultant individuel socio- Component 1: Building a Individual organisateur chargé du 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-10- 2018-10- 2019-02- IDA / 57080 safety net for the poor in Post Consultant Open 532.25 510.34 Completed ciblage des bénéficiaires 07 10 26 24 31 27 02 03 02 15 selected rural areas Selection complémentaires de l'ACTP à Antanifotsy. DRT11CICIB1802 / Consultant individuel socio- Component 1: Building a Individual organisateur chargé du 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-10- 2018-10- 2019-02- IDA / 57080 safety net for the poor in Post Consultant Open 532.25 468.96 Completed ciblage des bénéficiaires 07 10 26 24 31 27 02 03 02 15 selected rural areas Selection complémentaires de l'ACTP à Antanifotsy. DRT11CICIB1803 / Consultant individuel socio- Component 1: Building a Individual organisateur chargé du 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-10- 2018-10- 2019-02- IDA / 57080 safety net for the poor in Post Consultant Open 532.25 496.55 Completed ciblage des bénéficiaires 07 10 26 24 31 27 02 03 02 15 selected rural areas Selection complémentaires de l'ACTP à Antanifotsy. DRT11CICIB1804 / Consultant individuel socio- Component 1: Building a Individual organisateur chargé du 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-10- 2018-10- 2019-02- IDA / 57080 safety net for the poor in Post Consultant Open 532.25 441.38 Completed ciblage des bénéficiaires 07 10 26 24 31 27 02 03 02 15 selected rural areas Selection complémentaires de l'ACTP à Antanifotsy. DRT11CICIB1805 / Consultant individuel socio- Component 1: Building a Individual organisateur chargé du 2018-08- 2018-09- 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-10- 2018-10- 2019-02- IDA / 57080 safety net for the poor in Post Consultant Open 532.25 400.00 Completed ciblage des bénéficiaires 07 10 26 24 31 27 02 03 02 15 selected rural areas Selection complémentaires de l'ACTP à Antanifotsy. Component 1: Building a Individual DRP81CIAS18001 / 2018-08- 2018-08- 2018-09- 2018-10- 2018-09- 2018-10- 2018-09- 2018-10- 2019-09- IDA / D1450 safety net for the poor in Post Consultant Open 5,806.45 5,193.93 Signed ASDRPAMBOASARY 14 22 10 08 17 16 27 26 22 selected rural areas Selection Component 1: Building a Individual DRP81CIAS18002 / 2018-08- 2018-08- 2018-09- 2018-10- 2018-09- 2018-10- 2018-09- 2018-10- 2019-09- IDA / D1450 safety net for the poor in Post Consultant Open 5,806.45 4,864.83 Signed ASDRPAMBOVOMBE 14 22 10 08 17 16 27 26 22 selected rural areas Selection Component 1: Building a Individual DRP81CIAS18003 / 2018-08- 2018-08- 2018-09- 2018-10- 2018-09- 2018-10- 2018-09- 2018-10- 2019-09- IDA / D1450 safety net for the poor in Post Consultant Open 5,806.45 5,424.28 Signed ASDRPTSIHOMBE 14 22 10 08 17 16 27 26 22 selected rural areas Selection DG12CIANALTMC1826 / Component 1: Building a Individual 2018-08- 2018-09- 2018-08- 2018-09- 2018-09- 2018-09- 2018-09- 2018-10- 2018-10- 2018-12- ANALYSE COMPLEMENTAIRE IDA / 57080 safety net for the poor in Post Consultant Limited 1,250.00 1,704.54 Completed 20 06 25 13 04 25 10 01 10 07 TMC BETAFO selected rural areas Selection DRP81CIOS18009 / Component 1: Building a Individual 2018-11- 2018-09- 2018-11- 2018-09- 2018-11- 2018-09- 2018-11- 2018-09- 2018-12- OPERATEUR DE SAISIE IDA / D1450 safety net for the poor in Post Consultant Open 764.71 710.53 Signed 05 05 05 17 05 17 05 17 31 BEKILY selected rural areas Selection DRP81CIOS18010 / Component 1: Building a Individual 2018-11- 2018-11- 2018-11- 2019-01- 2018-11- 2019-02- 2018-11- 2019-02- 2019-03- OPERATEUR DE SAISIE A IDA / D1450 safety net for the poor in Post Consultant Open 882.00 1,237.10 Signed 05 05 21 28 23 04 28 04 31 TSIHOMBE selected rural areas Selection DG12CIAUDAMBALAK1828 / REDACTION (1) D'UN RAPPORT CIRCONSTANCIEL SUR L'ACCIDENT SURVENU A Component 2: LA MISSION DE SUPERVISION Individual Strengthening safety net 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-03- DE PAIEMENT AYANT IDA / 57080 Post Consultant Direct 25,000.00 20,882.00 Terminated administration, monitoring 11 05 13 06 17 10 21 10 26 ENTRAINE LE DECES D'UN Selection and social accountability EMPLOYE DE FID (2) D'UN RAPPORT SUR L'ANALYSE DES RISQUES, DES PRATIQUES ET DISPOSITIONS EN MATIÈRE DE SÉCURITÉ DRA12CISAI18011 / SAISIE DE CORESPONSABILITE Component 1: Building a Individual SCOLAIRE , DES FICHES DE 2018-12- 2017-02- 2019-01- 2019-01- 2019-01- 2019-01- 2019-01- 2019-02- 2019-07- IDA / 57080 safety net for the poor in Post Consultant Open 1,261.93 876.95 Signed PRESENCE ET MISE A JOUR 20 07 09 18 11 18 18 08 17 selected rural areas Selection D'INFORMATION DES BENEFICIAIRES TMDH DRA12CIACC18012 / ACCOMPAGNATEUR SPÉCIALISE DISTRICT MAHANORO Component 1: Building a Individual 2018-12- 2018-06- 2018-12- 2018-11- 2018-12- 2018-11- 2019-01- 2019-01- 2019-04- RENFORCEMENT DE IDA / 57080 safety net for the poor in Post Consultant Limited 1,379.03 3,181.95 Signed 20 11 25 30 28 30 07 30 07 CAPACITE ET DE selected rural areas Selection FORMATION DES MERES LEADER ET ACCOMPAGNEMENT DES ESPACE DE BIEN ETRE DRP81CIOS19001 / Component 1: Building a Individual 2019-01- 2019-01- 2019-01- 2019-02- 2019-01- 2019-02- 2019-02- 2019-02- 2019-06- OPERATEUR DE SAISIE IDA / D1450 safety net for the poor in Post Consultant Open 1,246.20 944.17 Signed 22 22 29 08 30 13 01 13 30 AMBOVOMBE selected rural areas Selection Component 1: Building a Individual DRP81CIOS19002 / 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-02- 2019-06- IDA / D1450 safety net for the poor in Post Consultant Open 1,063.70 947.77 Signed OPERATEUR DE SAISIE DRP 19 06 19 08 20 13 20 13 30 selected rural areas Selection DRA11CISEC19001 / MISE Component 1: Building a Individual EN ŒUVRE DE SUIVI 2019-02- 2019-03- 2019-03- 2019-03- 2019-06- IDA / 57080 safety net for the poor in Post Consultant Limited 614.41 0.00 Canceled EVALUATION 19 06 11 20 18 selected rural areas Selection COMMUNAUTAIRE ( SEC) dans 04 UTB ACT P VATOMANDRY DRF12CIAS19001 / Component 1: Building a Individual CONSULTANT TEMPORAIRE 2019-03- 2017-09- 2019-04- 2018-11- 2019-04- 2018-11- 2019-04- 2018-12- 2019-07- 2019-03- IDA / 57080 safety net for the poor in Post Consultant Open 1,224.26 1,178.49 Completed ACCOMPAGNATEURS 25 21 07 27 09 28 14 07 13 15 selected rural areas Selection SPECIALISES DRF12CIAS19002 / Component 1: Building a Individual 2019-03- 2017-09- 2019-04- 2018-11- 2019-04- 2018-11- 2019-04- 2018-12- 2019-07- 2019-03- RECRUTEMENT AS IDA / 57080 safety net for the poor in Post Consultant Open 1,224.26 1,178.18 Completed 25 21 07 27 09 28 14 07 13 15 TEMPORAIRE selected rural areas Selection DRF12CIAS19003 / Component 1: Building a Individual 2019-02- 2019-02- 2019-03- 2019-04- 2019-03- 2019-04- 2019-03- 2019-04- 2019-06- 2019-08- RECRUTEMENT AS IDA / 57080 safety net for the poor in Post Consultant Open 1,500.00 1,393.83 Completed 20 13 05 15 07 19 12 24 10 08 TEMPORAIRE selected rural areas Selection DRF12CIAS19004 / Component 1: Building a Individual 2019-02- 2019-02- 2019-03- 2019-05- 2019-03- 2019-05- 2019-03- 2019-06- 2019-06- 2019-10- RECRUTEMENT AS IDA / 57080 safety net for the poor in Post Consultant Open 1,500.00 1,394.23 Completed 20 13 05 14 07 31 12 03 10 04 TEMPORAIRE selected rural areas Selection DG20CIMANUTMDH1901 / MISE A JOUR DU MANUEL DE PROCÉDURES Component 2: Individual DES PROGRAMMES DE Strengthening safety net 2019-03- 2019-04- 2019-04- 2019-04- 2019-06- IDA / 57080 Post Consultant Open 6,000.00 0.00 Canceled TRANSFERT MONÉTAIRE administration, monitoring 14 12 19 29 28 Selection POUR LE DÉVELOPPEMENT and social accountability HUMAIN PROJET FILETS SOCIAUX DE SÉCURITÉ DG20CIMANUMACC1902 / MISE A JOUR DU MANUEL DE PROCÉDURES Component 2: Individual DES MESURES Strengthening safety net 2019-03- 2019-04- 2019-04- 2019-04- 2019-06- IDA / 57080 Post Consultant Open 6,000.00 0.00 Canceled D'ACCOMPAGNEMENT DU administration, monitoring 14 12 19 29 28 Selection PROGRAMME FILETS and social accountability SOCIAUX DE SÉCURITÉ EXÉCUTE PAR LE FID DG20CIMANUSE1903 / Component 2: MISE A JOUR DU MANUEL DE Individual Strengthening safety net 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-06- 2019-07- PROCEDURES IDA / 57080 Post Consultant Open 6,000.00 2,802.48 Completed administration, monitoring 14 15 12 29 19 02 29 03 28 31 SUIVI EVALUATION PROJET Selection and social accountability FILETS SOCIAUX DE SECURITE DG20CIMANUACTP1904 / MISE A JOUR DE MANUEL DE Component 2: Individual PROCÉDURE DES Strengthening safety net 2019-03- 2019-04- 2019-04- 2019-04- 2019-06- IDA / 57080 Post Consultant Open 6,000.00 0.00 Canceled OPÉRATIONS « ARGENT administration, monitoring 14 12 19 29 28 Selection CONTRE TRAVAIL and social accountability PRODUCTIF » PROJET FILETS SOCIAUX DE SÉCURITÉ DG20CIMANUADMPM1905 / MISE A JOUR DES MANUELS Component 2: DE PROCÉDURES Individual Strengthening safety net 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-06- ADMINISTRATIVES ET IDA / 57080 Post Consultant Open 6,000.00 2,593.12 Signed administration, monitoring 14 15 12 26 19 06 29 06 28 FINANCIÈRES ET PASSATION Selection and social accountability DE MARCHE PROJET FILETS SOCIAUX DE SÉCURITÉ DRF13CIOS19005 / RECRUTEMENT Component 1: Building a Individual 2019-05- 2019-06- 2019-05- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-09- 2019-09- CONSULTANT INDIVIDUEL IDA / 57080 safety net for the poor in Post Consultant Limited 617.65 453.58 Completed 20 04 22 17 19 18 25 19 23 03 TEMPORAIRE POUR LA SAISIE selected rural areas Selection DES DONNEES DANS LE MIS DG20CABCSPM1905 / Component 2: CABINET EN CHARGE DU Strengthening safety net 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-09- RECRUTEMENT DU CHEF DE IDA / 57080 Post Direct Selection Direct 3,000.00 2,279.51 Completed administration, monitoring 13 14 28 29 09 28 29 16 SERVICE PASSATION DES and social accountability MARCHES DG20CFORMRSE1901 / Component 2: Renforcement de capacités Strengthening safety net 2019-07- 2019-07- 2019-07- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- IDA / 57080 Post Direct Selection Direct 3,000.00 4,952.32 Completed en Suivi Évaluation de administration, monitoring 18 19 24 29 28 16 07 10 l'équipe Suivi Évaluation du and social accountability FID DG20CISTATECON1901 / Recrutement d'un Statisticien-économiste Component 1: Building a Individual chargé de la modélisation 2019-07- 2019-08- 2019-09- 2019-09- 2019-09- 2019-12- 2019-09- 2020-01- 2019-12- IDA / 57080 safety net for the poor in Post Consultant Open 6,000.00 3,199.72 Signed pour le recértification des 25 01 14 16 15 13 23 09 22 selected rural areas Selection bénéficiaires des activités TMDH du District de Betafo dans le cadre du Projet FSS DG20CICOMM1901 / Component 2: Individual Recrutement d 'un Strengthening safety net 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2019-09- 2019-09- 2019-09- 2019-11- IDA / 57080 Post Consultant Open 4,000.00 3,458.49 Signed Consultant en administration, monitoring 14 28 09 05 14 09 19 09 18 Selection communication and social accountability Component 2: DG20CIPM1902 / Individual Strengthening safety net 2019-09- 2019-08- 2019-09- 2019-09- 2019-09- 2019-06- 2019-09- 2019-07- 2019-12- 2019-09- Recrutement consultant en IDA / 57080 Post Consultant Direct 4,000.00 2,282.03 Completed administration, monitoring 01 30 03 03 05 12 07 02 06 16 Passation de marchés Selection and social accountability DRA12CISIGN19002 / Consultant individuel en Component 1: Building a Individual charge des suivis des 2019-10- 2019-10- 2019-10- 2019-10- 2019-12- IDA / 57080 safety net for the poor in Post Consultant Limited 222.22 0.00 Canceled signatures des contrats des 18 23 26 30 09 selected rural areas Selection bénéficiaires TMDH en vue de FSS-FA2 - DIST MAHANORO DRA12CISIGN19001 / Consultant individuel en Component 1: Building a Individual charge des suivis des 2019-10- 2019-10- 2019-10- 2019-10- 2019-12- IDA / 57080 safety net for the poor in Post Consultant Limited 222.22 0.00 Canceled signatures des contrats des 18 23 26 30 09 selected rural areas Selection bénéficiaires TMDH en vue de FSS-FA2 - DIST MAHANORO DRA12CISIGN19003 / Consultant individuel en Component 1: Building a Individual charge des suivis des 2019-10- 2019-10- 2019-10- 2019-10- 2019-12- IDA / 57080 safety net for the poor in Post Consultant Limited 222.22 0.00 Canceled signatures des contrats des 18 23 26 30 09 selected rural areas Selection bénéficiaires TMDH en vue de FSS-FA2 - DIST TOAMASINA II DRA12CISIGN19004 / Consultant individuel en Component 1: Building a Individual charge des suivis des 2019-10- 2019-10- 2019-10- 2019-10- 2019-12- IDA / 57080 safety net for the poor in Post Consultant Limited 222.22 0.00 Canceled signatures des contrats des 18 23 26 30 09 selected rural areas Selection bénéficiaires TMDH en vue de FSS-FA2 - DIST TOAMASINA II DRT12CICONT1901 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 138.31 Completed 22 19 23 28 28 23 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho Page 15 DRT12CICONT1902 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 130.20 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1903 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 130.96 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1904 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 157.04 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1905 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 157.04 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1906 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 147.80 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1907 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 140.74 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1908 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 151.61 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1909 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 166.82 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1910 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 135.31 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1911 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 152.70 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1912 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 147.26 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1913 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 151.61 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1914 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 147.80 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRT12CICONT1915 / Signature et dispatch des Component 1: Building a Individual 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- contrats des bénéficiaires IDA / 57080 safety net for the poor in Post Consultant Limited 138.89 147.26 Completed 22 19 23 23 28 28 30 28 30 06 du TMDH dans le District de selected rural areas Selection Faratsiho DRP82CISIGN19024 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 271.37 Completed 24 23 26 28 28 28 28 28 07 07 BEKILY1 selected rural areas Selection DRP82CISIGN19025 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 248.50 Completed 24 23 26 28 28 28 28 28 07 07 BEKILY2 selected rural areas Selection DRP82CISIGN19026 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 26 28 28 28 28 28 07 07 BEKILY3 selected rural areas Selection DRP82CISIGN19001 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- CISIGNATURECONTRATMGA IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 26 28 28 28 28 28 07 07 MBOASARY1 selected rural areas Selection DRP82CISIGN19002 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 26 28 28 28 28 28 07 07 OASARY2 selected rural areas Selection DRP82CISIGN19027 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 26 28 28 28 28 28 07 07 BEKILY4 selected rural areas Selection DRP82CISIGN19003 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 OASARY3 selected rural areas Selection DRP82CISIGN19004 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 OASARY4 selected rural areas Selection DRP82CISIGN19005 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 17 28 18 07 OASARY5 selected rural areas Selection DRP82CISIGN19006 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 OASARY6 selected rural areas Selection DRP82CISIGN19007 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 OASARY7 selected rural areas Selection DRP82CISIGN19008 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 OASARY8 selected rural areas Selection DRP82CISIGN19009 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 28 25 28 30 28 01 28 01 07 OASARY9 selected rural areas Selection DRP82CISIGN19010 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 188.06 Completed 24 26 25 28 30 28 01 28 02 07 OBOMBE11 selected rural areas Selection DRP82CISIGN19028 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 26 28 28 28 28 28 07 07 BEKILY5 selected rural areas Selection DRP82CISIGN19029 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 26 28 28 28 28 28 07 07 BEKILY6 selected rural areas Selection DRP82CISIGN19030 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 26 28 28 28 28 28 07 07 BEKILY7 selected rural areas Selection DRP82CISIGN19031 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 26 28 28 28 28 28 07 07 BEKILY8 selected rural areas Selection DRP82CISIGN19032 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 26 28 28 28 28 28 07 07 BELOHA1 selected rural areas Selection DRP82CISIGN19033 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 26 28 28 28 28 28 07 07 BELOHA2 selected rural areas Selection DRP82CISIGN19034 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 26 28 28 28 28 28 07 07 BELOHA3 selected rural areas Selection DRP82CISIGN19035 / CI Component 1: Building a Individual 2019-10- 2019-11- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 28 26 28 28 28 28 28 07 07 BELOHA4 selected rural areas Selection DRP82CISIGN19036 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 BELOHA5 selected rural areas Selection DRP82CISIGN19037 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 BELOHA6 selected rural areas Selection DRP82CISIGN19011 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 188.06 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE12 selected rural areas Selection DRP82CISIGN19039 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 BELOHA8 selected rural areas Selection DRP82CISIGN19038 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 BELOHA7 selected rural areas Selection DRP82CISIGN19012 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURE IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 CONTRATAMBOVOMBE13 selected rural areas Selection DRP82CISIGN19040 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.93 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE1 selected rural areas Selection DRP82CISIGN19013 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE14 selected rural areas Selection DRP82CISIGN19041 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.93 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE2 selected rural areas Selection DRP82CISIGN19042 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.93 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE3 selected rural areas Selection DRP82CISIGN19043 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.93 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE4 selected rural areas Selection DRP82CISIGN19044 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.93 Completed 24 26 26 28 28 28 28 28 07 07 TSIHOMBE5 selected rural areas Selection DRP82CISIGN19045 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.93 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE6 selected rural areas Selection DRP82CISIGN19046 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.93 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE7 selected rural areas Selection DRP82CISIGN19047 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.93 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE8 selected rural areas Selection DRP82CISIGN19048 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.77 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE9 selected rural areas Selection DRP82CISIGN19014 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE15 selected rural areas Selection DRP82CISIGN19049 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.77 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE10 selected rural areas Selection DRP82CISIGN19050 / CI Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- SIGNATURE CONTRAT MG IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.77 Completed 24 26 25 28 30 28 01 28 02 07 TSIHOMBE11 selected rural areas Selection DRP82CISIGN19015 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE16 selected rural areas Selection DRP82CISIGN19016 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE17 selected rural areas Selection DRP82CISIGN19017 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE18 selected rural areas Selection DRP82CISIGN19018 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE21 selected rural areas Selection DRP82CISIGN19019 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 29 28 03 28 05 28 06 07 OVOMBE22 selected rural areas Selection DRP82CISIGN19020 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE23 selected rural areas Selection DRP82CISIGN19021 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE24 selected rural areas Selection DRP82CISIGN19022 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 191.34 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE25 selected rural areas Selection DRP82CISIGN19023 / Component 1: Building a Individual 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- CISIGNATURECONTRATAMB IDA / D1450 safety net for the poor in Post Consultant Limited 225.83 187.96 Completed 24 26 25 28 30 28 01 28 02 07 OVOMBE26 selected rural areas Selection DRK11CIAS19001 / Component 1: Building a Individual RECRUTEMENT 2019-11- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Open 10,000.00 5,584.90 Signed ACCOMPAGNATEUR 29 10 19 17 22 07 09 23 08 selected rural areas Selection SPÉCIALISÉ ACTP DRA12CISOMAJ19003 / Consultants Individuels Component 1: Building a Individual chargés de la mise à jour 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 518.67 Signed des données sur les 28 20 03 03 06 10 10 24 24 selected rural areas Selection ménages TMDH DISTRICT TOAMASINA II ET MAHANORO DRF12CIMAJ19001 / RECRUTEMENT Component 1: Building a Individual CONSULTANT INDIVIDUEL 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 1,625.00 647.46 Signed POUR LA MISE A JOUR DES 05 19 10 22 13 24 17 24 31 selected rural areas Selection MENAGES BENEFICIAIRES TMDH DISTRICT AMBOHIMAHASOA DRF12CIMAJ19002 / RECRUTEMENT Component 1: Building a Individual CONSULTANT INDIVIDUEL 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 1,625.00 647.46 Signed POUR LA MISE A JOUR DES 04 19 09 22 12 24 16 24 30 selected rural areas Selection BENEFICIAIRES TMDH DISTRICT AMBOHIMAHASOA DRF12CIMAJ19003 / RECRUTEMENT Component 1: Building a Individual CONSULTANT INDIVIDUEL 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 1,625.00 647.46 Signed POUR LA MISE A JOUR DES 05 19 10 22 13 24 17 24 31 selected rural areas Selection BENEFICIAIRES TMDH DISTRICT AMBOHIMAHASOA DRF12CIMAJ19004 / RECRUTEMENT Component 1: Building a Individual CONSULTANT INDIVIDUEL 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 1,625.00 647.46 Signed POUR LA MISE A JOUR DES 05 19 10 22 13 11 17 24 31 selected rural areas Selection BENEFICIAIRES TMDH DISTRICT AMBOHIMAHASOA DRF12CIOS19001 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,210.34 Signed DE SAISIE TMDH DISTRICT 12 19 17 10 24 13 14 31 27 selected rural areas Selection AMBOHIMAHASOA Page 16 DRF12CIOS19002 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,210.34 Signed DE SAISIE TMDH DISTRICT 12 19 17 10 24 13 14 31 27 selected rural areas Selection AMBOHIMAHASOA DRF12CIOS19003 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,216.28 Signed DE SAISIE TMDH DISTRICT 12 19 17 10 24 13 14 31 08 selected rural areas Selection AMBOHIMAHASOA DRF12CIOS19004 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,216.28 Signed DE SAISIE TMDH DISTRICT 12 19 17 10 24 13 14 31 08 selected rural areas Selection AMBOHIMAHASOA DRF11CIOS19001 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-12- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,023.73 Signed DE SAISIE ACTP DISTRICT 12 19 17 24 07 27 11 02 31 selected rural areas Selection ISANDRA DRF11CIOS19002 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,023.73 Signed DE SAISIE ACTP DISTRICT 12 19 17 24 24 27 14 02 08 selected rural areas Selection ISANDRA DRF11CIOS19003 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,023.73 Signed DE SAISIE ACTP DISTRICT 12 19 17 24 24 27 14 02 08 selected rural areas Selection ISANDRA DRF11CIOS19004 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 1,748.72 Signed DE SAISIE ACTP DISTRICT 12 19 17 26 24 01 14 01 08 selected rural areas Selection MANANDRIANA DRA12CISOMAJ19001 / Component 1: Building a Individual Mise à jour des données sur 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 530.05 Signed les ménages TMDH 28 20 03 03 06 10 10 24 24 selected rural areas Selection DISTRICT TOAMASINA II ET MAHANORO DRA12CISOMAJ19002 / MISE A JOUR DES Component 1: Building a Individual INFORMATIONS SUR LES 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 525.91 Signed MENAGES BENEFICIAIRES 28 20 03 03 06 10 10 24 24 selected rural areas Selection DES ACTIVITES TMDH DISTRICRT TOAMASINA II ET MAHANORO DRA12CISOMAJ19004 / MISE A JOUR DES Component 1: Building a Individual INFORMATIONS SUR LES 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 532.89 Signed MENAGES BENEFICIAIRES 28 20 03 03 06 10 10 24 24 selected rural areas Selection DES ACTIVITES TMDH - DISTRICT TOAMASINA II ET MAHANORO DRA12CISOMAJ19005 / MISE A JOUR DES Component 1: Building a Individual INFORMATIONS SUR LES 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 527.46 Signed MENAGES BENEFICIAIRES 28 20 03 03 06 10 10 24 24 selected rural areas Selection DES ACTIVITES TMDH DANS LE DISTRICRT TOAMASINA II ET MAHANORO DRA12CISOMAJ19006 / MISE A JOUR DES Component 1: Building a Individual INFORMATIONS SUR LES 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 523.84 Signed MENAGES BENEFICIAIRES 28 20 03 03 06 10 10 24 24 selected rural areas Selection DES ACTIVITES TMDH DANS LE DISTRICRT TOAMASINA II ET MAHANORO DRA12CISOMAJ19007 / MISE A JOUR DES Component 1: Building a Individual INFORMATIONS SUR LES 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 521.26 Signed MENAGES BENEFICIAIRES 28 20 03 03 06 10 10 24 24 selected rural areas Selection DES ACTIVITES TMDH DANS LE DISTRICRT TOAMASINA II ET MAHANORO DRA12CISOMAJ19008 / MISE A JOUR DES Component 1: Building a Individual INFORMATIONS SUR LES 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 525.65 Signed MENAGES BENEFICIAIRES 28 20 03 03 06 10 10 24 24 selected rural areas Selection DES ACTIVITES TMDH DANS LE DISTRICRT TOAMASINA II ET MAHANORO DRK11CIAS19002 / RECRUTEMENT Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Open 10,000.00 5,584.90 Signed 29 19 19 17 22 07 09 23 08 SPÉCIALISÉ MESURE selected rural areas Selection D'ACCOMPAGNEMENT ACTP DRK11CIAS19003 / RECRUTEMENT Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Open 10,000.00 5,584.90 Signed 29 19 19 17 22 07 09 23 08 SPÉCIALISÉ MESURE selected rural areas Selection D'ACCOMPAGNEMENT ACTP DRK11CIAS19004 / RECRUTEMENT Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Open 10,000.00 5,584.90 Signed 29 19 19 17 22 07 09 22 08 SPÉCIALISÉ MESURE selected rural areas Selection D'ACCOMPAGNEMENT ACTP DRK11CIAS19005 / RECRUTEMENT Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Open 10,000.00 5,584.90 Signed 29 19 19 17 22 07 09 23 08 SPÉCIALISÉ MESURE selected rural areas Selection D'ACCOMPAGNEMENT ACTP DRK11CIAS19006 / RECRUTEMENT Component 1: Building a Individual Pending 2019-11- 2019-12- 2019-12- 2020-01- 2021-01- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Open 10,000.00 0.00 Implementation 29 19 22 09 08 SPÉCIALISÉ MESURE selected rural areas Selection D'ACCOMPAGNEMENT ACTP DRF11CIOS19005 / Component 1: Building a Individual RECRUTEMENT OPERATEUR 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 1,748.72 Signed DE SAISIE ACTP DISTRICT 12 19 17 26 24 01 14 01 08 selected rural areas Selection MANANDRIANA DRF12CISOCOP19001 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 25.83 Signed 05 18 10 27 17 28 07 05 05 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19002 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 41.32 Signed 05 18 10 27 17 28 07 05 05 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19003 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 36.16 Signed 05 18 10 27 17 28 07 05 05 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19004 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 38.75 Signed 05 18 10 27 17 28 07 05 05 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19005 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 36.16 Signed 05 18 10 27 17 28 07 05 05 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19006 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 33.58 Signed 05 18 10 27 17 28 07 05 05 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19007 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 38.75 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19008 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 33.58 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19009 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 46.48 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19010 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 33.58 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19011 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 25.82 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19012 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 36.15 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19013 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 41.33 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19014 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 51.66 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19015 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 33.58 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19016 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 51.65 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19017 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 41.32 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19018 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 33.58 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19019 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 43.91 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19020 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 25.83 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19021 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 36.16 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19022 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 36.16 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19023 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 33.58 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19024 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 33.58 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19025 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 51.66 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19026 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 41.33 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19027 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 51.66 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19028 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 33.58 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19029 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 36.16 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19030 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 25.83 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CISOCOP19031 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-02- 2020-05- 2020-08- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 165.00 25.82 Signed 05 18 10 27 31 28 04 05 02 CHARGE COUP DE POUCE selected rural areas Selection TMDH DISTRICT AMBOHIMAHASOA DRF12CIASTMDH19001 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2022-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,898.20 Signed 12 20 17 05 07 12 11 24 03 SPECIALISE TMDH DANS LE selected rural areas Selection DISTRICT D'AMBOHIMAHASOA DRF12CIASTMDH19002 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2022-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,898.20 Signed 12 20 17 05 07 18 11 24 03 SPECIALISE TMDH DANS LE selected rural areas Selection DISTRICT D'AMBOHIMAHASOA DRF12CIASTMDH19003 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2022-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,898.20 Signed 12 20 17 05 07 18 11 24 03 SPECIALISE TMDH DANS LE selected rural areas Selection DISTRICT D'AMBOHIMAHASOA DRF12CIASTMDH19004 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2022-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,898.20 Signed 12 20 17 05 07 18 11 24 03 SPECIALISE TMDH DANS LE selected rural areas Selection DISTRICT D'AMBOHIMAHASOA DRF12CIASTMDH19005 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-08- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,896.86 Signed 12 20 17 05 07 18 11 24 04 SPECIALISE TMDH DANS LE selected rural areas Selection DISTRICT D'AMBOHIMAHASOA DRF11CIAS19001 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-03- 2020-01- 2020-04- 2020-02- 2020-04- 2021-08- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 5,632.42 Signed 12 27 17 17 07 13 11 30 04 SPECIALISE ACTP DANS LE selected rural areas Selection DISTRICT D'ISANDRA DRF11CIAS19002 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2020-01- 2020-04- 2020-02- 2020-04- 2021-08- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 5,632.42 Signed 12 06 17 13 07 15 11 30 04 SPECIALISE ACTP DANS LE selected rural areas Selection DISTRICT D'ISANDRA Page 17 DRF11CIAS19004 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2020-01- 2020-04- 2020-02- 2020-04- 2021-08- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 5,632.42 Signed 12 06 17 13 07 15 11 30 04 SPECIALISE ACTP DANS LE selected rural areas Selection DISTRICT D'ISANDRA DRF11CIAS19005 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2020-01- 2020-04- 2020-02- 2020-04- 2021-08- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 5,632.42 Signed 12 06 17 13 07 15 11 30 04 SPECIALISE ACTP DANS LE selected rural areas Selection DISTRICT DE MANANDRIANA DRF11CIAS19006 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2020-01- 2020-04- 2020-02- 2020-04- 2021-08- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 5,632.42 Signed 12 06 17 13 07 15 11 30 04 SPECIALISE ACTP DANS LE selected rural areas Selection DISTRICT DE MANANDRIANA DRF11CIAS19003 / RECRUTEMENT Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2020-01- 2020-04- 2020-02- 2020-04- 2021-08- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 5,632.42 Signed 12 06 17 13 07 15 11 30 04 SPECIALISE ACTP DANS LE selected rural areas Selection DISTRICT DE MANANDRIANA DRP82CIOS20007 / CI Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEUR DE SAISIE IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,158.12 Signed 29 23 09 24 16 20 08 01 07 BELOHA 1 selected rural areas Selection DRP82CIOS20008 / CI Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEUR DE SAISIE IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,184.02 Signed 29 23 09 24 16 28 08 01 07 BELOHA 2 selected rural areas Selection DG20SCISEC_SYS_INFO / Component 2: Individual Pool de consultants Strengthening safety net 2019-11- 2019-11- 2019-12- 2020-06- 2020-01- 2020-08- 2020-02- 2020-09- 2020-04- IDA / D4340 Post Consultant Open 10,000.00 6,385.42 Signed individuels chargé de l'étude administration, monitoring 28 18 26 05 09 18 06 09 06 Selection sécurisation du système and social accountability informatique DRP82CIOS20009 / CI Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- 2020-02- 2020-12- OPERATEUR DE SAISIE IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,184.02 Signed 03 23 08 24 29 28 02 01 31 BELOHA 3 selected rural areas Selection DG20SCI_SUP_BETAFO1 / Component 1: Building a Individual Superviseur des enquêteurs 2019-12- 2019-10- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Open 1,000.00 1,033.20 Signed pour la re-certification 09 29 06 07 20 11 17 09 17 selected rural areas Selection bénéficiaires Betafo (1) DG20SCI_SUP_BETAFO2 / Component 1: Building a Individual Superviseur des enquêteurs 2019-12- 2019-10- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Open 1,000.00 1,033.20 Signed pour la re-certification 09 29 06 07 20 11 17 09 17 selected rural areas Selection bénéficiaires Betafo (2) DG20SCI_SUP_BETAFO3 / Component 1: Building a Individual Superviseur des enquêteurs 2019-12- 2019-10- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Open 1,000.00 1,033.20 Signed pour la re-certification 09 29 06 07 20 11 17 09 17 selected rural areas Selection bénéficiaires Betafo (3) DG20SCI_SUP_BETAFO4 / Component 1: Building a Individual Superviseur des enquêteurs 2019-12- 2019-10- 2020-01- 2020-06- 2020-01- 2020-02- 2020-02- 2020-03- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Open 1,000.00 1,033.20 Signed pour la re-certification 09 29 06 07 20 11 17 09 17 selected rural areas Selection bénéficiaires Betafo (4) DRA12CISOMAJ19010 / MISE A JOUR DES Component 1: Building a Individual INFORMATIONS DES 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 526.42 Signed MENAGES BENEFICIAIRES 28 20 03 17 06 10 10 24 24 selected rural areas Selection DES ACTIVITES TMDH DANS LE DISTRICT TOAMASINA II ET MAHANORO DRP82CIOS20001 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEURDESAISIEDRPAMB IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,158.12 Signed 28 23 09 24 16 20 08 01 07 OVOMBE1 selected rural areas Selection DRP82CIOS20010 / CI Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEUR DE SAISIE IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,183.45 Signed 29 23 09 24 16 28 08 01 07 TSIHOMBE 1 selected rural areas Selection DRA12CISOMAJ19009 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 525.91 Signed 28 20 03 03 06 10 10 24 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DRP82CIOS20011 / CI Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEUR DE SAISIE IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,183.45 Signed 29 23 09 24 16 28 08 01 07 TSIHOMBE 2 selected rural areas Selection DRT12CIAS19001 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,693.22 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Betafo 1 DRT12CIAS19002 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,550.96 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Betafo 2 DRT12CIAS19003 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,622.09 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Betafo 3 DRT12CIAS19004 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,693.22 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Betafo 4 DRT12CIAS19005 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,693.22 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Betafo 5 DRT12CIAS19006 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,206.69 Signed dans le cadre du TMDH à 16 20 21 11 28 14 18 02 31 selected rural areas Selection Faratsiho 1 DRT12CIAS19007 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,693.22 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Faratsiho 2 DRT12CIAS19008 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,693.22 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Faratsiho 3 DRT12CIAS19009 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,693.22 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Faratsiho 4 DRP82CIOS20002 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEURDESAISIEDRPAMB IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,173.30 Signed 28 23 09 24 16 20 08 01 07 OVOMBE2 selected rural areas Selection DRT12CIAS19010 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,693.22 Signed dans le cadre du TMDH à 16 20 21 10 28 14 18 02 31 selected rural areas Selection Faratsiho 5 DRT12CIAS19011 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,500.00 5,550.96 Signed dans le cadre du TMDH- 16 20 21 10 28 14 18 02 31 selected rural areas Selection DPEI 1 DRT12CIAS19012 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-12- Accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 8,500.00 5,550.96 Signed 16 20 21 10 28 14 18 02 31 dans le cadre du TMDH- selected rural areas Selection DPEI DRT12CIAS19013 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-02- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 6,641.58 Signed dans le cadre du TMDH- 16 20 21 23 28 28 18 28 31 selected rural areas Selection Inclusion Productive DRT12CIAS19014 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-02- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Limited 8,000.00 5,682.15 Signed dans le cadre du TMDH- 16 20 21 23 28 28 18 28 31 selected rural areas Selection Inclusion Productive DRP82CIOS20003 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEURDESAISIEDRPAMB IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,170.16 Signed 28 23 09 24 16 20 08 01 07 OVOMBE3 selected rural areas Selection DRA12CISOMAJ19011 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 501.09 Signed 28 20 03 20 06 10 10 24 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DRK11CIOSACTP19001 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-01- CHARGE DE LA SAISIE DE IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,078.75 Signed 09 18 14 18 21 31 11 07 05 DONNÉES SUR MIS DANS LE selected rural areas Selection CADRE DE L' ACTP DRP82CIOS20004 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEURDESAISIEDRPAMB IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,170.16 Signed 28 23 09 24 16 20 08 01 07 OVOMBE4 selected rural areas Selection DRT12CISOCOP19001 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 91.92 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRK11CIOSACTP19003 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-01- 2020-04- OPÉRATEUR DE SAISIE DANS IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,078.75 Completed 09 18 14 18 21 31 11 07 05 09 LE CADRE DE L'ACTP selected rural areas Selection DRT12CISOCOP19002 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 103.41 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19003 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 111.02 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19004 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 114.90 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRT12CISOCOP19005 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 114.90 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19006 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 103.41 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRT12CISOCOP19007 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 103.41 Completed 16 17 21 07 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19008 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 91.79 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRK12CIASTMDH19001 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 6,250.00 5,112.95 Signed 12 19 17 03 07 10 11 25 10 SPÉCIALISE DANS LE CADRE selected rural areas Selection DU TMDH DRT12CISOCOP19009 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 91.92 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRP82CIOS20013 / CI Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEUR DE SAISIE IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,183.69 Signed 29 23 09 24 16 29 08 01 07 BEKILY 1 selected rural areas Selection DRT12CISOCOP19010 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 114.90 Completed 16 17 21 16 28 27 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRT12CISOCOP19011 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 114.90 Completed 16 17 21 20 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19012 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 114.90 Completed 16 17 21 20 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19013 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 103.41 Completed 16 17 21 27 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRP82CIOS20014 / CI Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-03- OPERATEUR DE SAISIE IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 2,183.69 Signed 29 23 09 24 16 29 08 01 07 BEKILY 2 selected rural areas Selection DRT12CISOCOP19014 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 68.94 Completed 16 17 21 07 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19015 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 91.79 Completed 16 17 21 07 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19016 / Component 1: Building a Individual 2019-12- 2020-05- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 103.27 Signed 16 18 21 07 28 27 18 18 16 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19017 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 68.94 Completed 16 17 21 07 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19018 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 111.02 Completed 16 17 21 07 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19019 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 103.41 Completed 16 17 21 08 28 27 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRT12CISOCOP19020 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 103.41 Completed 16 17 21 07 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CISOCOP19021 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 111.02 Completed 16 17 21 07 28 27 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRT12CISOCOP19023 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 91.92 Completed 16 17 21 10 28 27 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRT12CISOCOP19024 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 114.90 Completed 16 17 21 20 28 27 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRT12CISOCOP19025 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 114.90 Completed 16 17 21 28 28 28 18 18 16 18 du coup de pouce TMDH selected rural areas Selection DRT12CISOCOP19026 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-01- 2020-02- 2020-12- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Direct 100.00 0.00 Canceled 03 17 13 03 07 31 du coup de pouce TMDH selected rural areas Selection DRK12CIASTMDH19002 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 6,250.00 5,112.95 Signed 12 19 17 03 07 10 11 25 10 SPECIALISE DANS LE CADRE selected rural areas Selection DU TMDH DRT12CISOCOP19022 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-05- 2020-07- 2020-09- Socio-organisateur chargé IDA / D4340 safety net for the poor in Post Consultant Limited 100.00 91.92 Completed 16 17 21 10 28 27 18 18 16 18 du coup de pouce du TMDH selected rural areas Selection DRT12CIMAJ19001 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 298.07 Completed 16 20 21 12 28 12 18 12 07 19 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19002 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-09- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 485.04 Completed 16 20 21 10 28 12 18 12 07 02 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRK12CIASTMDH19003 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 6,250.00 5,114.93 Signed 12 19 17 03 07 10 11 25 10 SPÉCIALISÉ DANS LE CADRE selected rural areas Selection DU TMDH DRT12CIMAJ19003 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-09- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 479.62 Completed 16 20 21 10 28 12 18 12 07 02 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH Page 18 DRT12CIMAJ19004 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 292.65 Completed 16 20 21 12 28 12 18 12 07 11 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRP82CIMAJ19001 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE1 selected rural areas Selection DRT12CIMAJ19005 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 292.65 Completed 16 20 21 10 28 11 18 12 07 11 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19006 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 474.20 Completed 16 20 21 10 28 12 18 12 07 19 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19007 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 298.07 Completed 16 20 21 10 28 11 18 12 07 13 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19008 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 495.88 Completed 16 20 21 11 28 12 18 12 07 19 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19009 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 303.49 Completed 16 20 21 11 28 11 18 12 07 11 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRP82CIMAJ19002 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE2 selected rural areas Selection DRT12CIMAJ19010 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 308.91 Completed 16 20 21 10 28 11 18 12 07 11 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19011 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 509.42 Completed 16 20 21 10 28 12 18 12 07 13 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRK12CIASTMDH19004 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 6,250.00 5,114.93 Signed 12 19 17 03 07 10 11 25 10 SPECIALISE DANS LE CADRE selected rural areas Selection DU TMDH DRT12CIMAJ19012 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 468.78 Completed 16 20 21 10 28 12 18 12 07 13 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19013 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 292.65 Completed 16 20 21 12 28 12 18 12 07 13 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19014 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 476.91 Completed 16 20 21 10 28 12 18 12 07 13 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRP82CIMAJ19003 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVMBE IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 3 selected rural areas Selection DRK12CIASTMDH19005 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 6,250.00 5,114.93 Signed 12 19 17 03 07 10 11 25 10 SPÉCIALISÉ DANS LE CADRE selected rural areas Selection DU TMDH DRK12CIASTMDH19006 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 6,250.00 5,112.95 Signed 12 19 17 03 07 10 11 25 10 SPECIALISE DANS LE CADRE selected rural areas Selection DU TMDH DRP82CIMAJ19004 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE4 selected rural areas Selection DRK12CIASTMDH19007 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 6,250.00 5,112.95 Signed 12 19 17 03 07 10 11 25 10 SPÉCIALISE DANS LE CADRE selected rural areas Selection DU TMDH DRK12CIASTMDH19008 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2021-02- ACCOMPAGNATEUR IDA / D4340 safety net for the poor in Post Consultant Limited 6,250.00 5,112.95 Signed 12 19 17 03 07 10 11 25 10 SPÉCIALISÉ DANS LE CADRE selected rural areas Selection DU TMDH DRP82CIMAJ19005 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE5 selected rural areas Selection DRP82CIMAJ19006 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE6 selected rural areas Selection DRP82CIMAJ19007 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVMBE IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 7 selected rural areas Selection DRP82CIMAJ19008 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVMBE IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 8 selected rural areas Selection DRT12CIOS19001 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,138.46 Signed 16 13 21 12 28 13 18 14 17 cadre du TMDH selected rural areas Selection DRP82CIMAJ19009 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE9 selected rural areas Selection DRT12CIOS19002 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,138.46 Signed 16 13 21 12 28 13 18 14 17 cadre du TMDH selected rural areas Selection DRT12CIOS19003 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,138.46 Signed 16 13 21 12 28 13 18 14 17 cadre du TMDH selected rural areas Selection DRT12CIOS19004 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,133.89 Signed 16 13 21 12 28 13 18 14 17 cadre du TMDH selected rural areas Selection DRP82CIMAJ19010 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE10 selected rural areas Selection DRP82CIMAJ19011 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE11 selected rural areas Selection DRP82CIMAJ19012 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE12 selected rural areas Selection DRT11CIOS19001 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,129.79 Signed 16 13 21 12 28 13 18 14 17 cadre de l'ACTP selected rural areas Selection DRT11CIOS19002 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,129.79 Signed 16 13 21 12 28 13 18 14 17 cadre de l'ACTP selected rural areas Selection DRA12CISOMAJ19012 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 526.42 Signed 28 20 03 17 06 10 10 24 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DRT11CIOS19003 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,129.79 Signed 16 13 21 12 28 13 18 14 17 cadre de l'ACTP selected rural areas Selection DRT11CIOS19004 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,129.79 Signed 16 13 21 12 28 13 18 14 17 cadre de l'ACTP selected rural areas Selection DRP82CIMAJ19013 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE13 selected rural areas Selection DRT11CIOS19005 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2022-02- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,129.79 Signed 16 13 21 12 11 13 15 14 07 cadre de l'ACTP selected rural areas Selection DRT11CIOS19006 / Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2022-02- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,138.46 Signed 16 13 21 12 11 13 15 14 07 cadre de l'ACTP selected rural areas Selection DRP82CIMAJ19014 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE14 selected rural areas Selection DRA12CISOMAJ19013 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 504.32 Signed 28 20 03 03 06 10 10 24 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DRA12CISOMAJ19014 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 501.48 Signed 28 20 03 04 06 10 10 24 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DRP82CIMAJ19015 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE15 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19026 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA1 28 05 06 10 22 selected rural areas Selection DRP82CIMAJ19016 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOVOM IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 BE16 selected rural areas Selection DRT11CIAS19001 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,451.49 Signed 16 07 21 18 28 07 18 07 17 dans le cadre de l’ACTP selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19027 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA2 28 05 06 10 22 selected rural areas Selection DRP82CIMAJ19017 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y1 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19028 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA3 28 05 06 10 22 selected rural areas Selection DRP82CIMAJ19018 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y2 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19029 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA4 28 05 06 10 22 selected rural areas Selection DRP82CIMAJ19019 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y3 selected rural areas Selection DRA12CIOS19001 / Saisie des fiches de coresponsabilité scolaires, Component 1: Building a Individual des fiches de présence, des 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed états de paiements et mise à 02 20 07 08 14 09 03 30 02 selected rural areas Selection jour des informations des bénéficiaires du projet TMDH – ACT P dans le progiciel MIS. DRT11CIAS19002 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,663.50 Signed 16 07 21 16 28 01 18 02 17 dans le cadre de l’ACTP selected rural areas Selection DRK11CIOSTMDH19001 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- OPÉRATEUR DE SAISIE DANS IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,081.41 Signed 12 18 17 18 24 04 14 07 08 LE CADRE DU TMDH selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19030 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA5 28 05 06 10 22 selected rural areas Selection DRT11CIAS19003 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,610.50 Signed 16 07 21 17 28 01 18 02 17 dans le cadre de l'ACTP selected rural areas Selection DRT11CIAS19004 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,769.50 Signed 16 07 21 16 28 01 18 02 17 dans le cadre de l’ACTP selected rural areas Selection DRT11CIAS19005 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,769.50 Signed 16 07 21 16 28 07 18 07 17 dans le cadre de l'ACTP selected rural areas Selection DRP82CIMAJ19020 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y4 selected rural areas Selection DRK11CIOSTMDH19002 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- OPÉRATEUR DE SAISIE DANS IDA / 57080 safety net for the poor in Post Consultant Limited 5,000.00 2,078.75 Signed 12 18 17 18 24 04 14 07 08 LE CADRE DU TMDH selected rural areas Selection DRT11CIAS19006 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,928.50 Signed 16 07 21 17 28 01 18 02 17 dans le cadre de l’ACTP selected rural areas Selection DRK11CIOSTMDH19003 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- OPÉRATEUR DE SAISIE DANS IDA / 57080 safety net for the poor in Post Consultant Limited 5,000.00 2,078.75 Signed 12 18 17 18 24 04 14 07 08 LE CADRE DU TMDH selected rural areas Selection DRT11CIAS19007 / Component 1: Building a Individual 2019-12- 2020-02- 2019-12- 2020-07- 2019-12- 2020-08- 2020-01- 2020-09- 2021-01- Accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,423.68 Signed 16 07 21 22 28 31 18 30 17 dans le cadre de l'ACTP selected rural areas Selection DRP82CIMAJ19021 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y5 selected rural areas Selection DRT11CIAS19008 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-01- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 0.00 Canceled dans le cadre de l’ACTP - 16 21 28 18 17 selected rural areas Selection Inclusion Productive Component 1: Building a Individual DRP82CIMAJ19031 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA6 28 05 06 10 22 selected rural areas Selection DRT11CIAS19009 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2019-12- 2020-01- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 0.00 Canceled dans le cadre de l'ACTP- 16 21 28 18 17 selected rural areas Selection Inclusion Productive DRK11CIOSTMDH19004 / Component 1: Building a Individual Pending 2019-12- 2019-12- 2019-12- 2020-01- 2021-01- OPÉRATEUR DE SAISIE DANS IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 0.00 Implementation 12 17 24 14 08 LE CADRE DU TMDH selected rural areas Selection Page 19 DRA11CIOS19002 / Saisie des fiches de coresponsabilité scolaires, Component 1: Building a Individual des fiches de présence, des 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed états de paiements et mise à 02 20 07 08 14 09 03 30 02 selected rural areas Selection jour des informations des bénéficiaires du projet TMDH – ACT P dans le progiciel MIS. DRP82CIMAJ19022 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y6 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19032 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA7 28 05 06 10 22 selected rural areas Selection DRP82CIMAJ19023 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y7 selected rural areas Selection DRA11CIOS19003 / Saisie des fiches de coresponsabilité scolaires, Component 1: Building a Individual des fiches de présence, des 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed états de paiements et mise à 02 20 07 08 14 09 03 30 02 selected rural areas Selection jour des informations des bénéficiaires du projet TMDH – ACT P dans le progiciel MIS. DRP82CIMAJ19024 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y8 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19033 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA8 28 05 06 10 22 selected rural areas Selection DRA11CIOS19001 / Saisie des fiches de coresponsabilité scolaires, Component 1: Building a Individual des fiches de présence, des 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed états de paiements et mise à 02 20 07 08 14 09 03 30 02 selected rural areas Selection jour des informations des bénéficiaires du projet TMDH – ACT P dans le progiciel MIS. DRP82CIMAJ19025 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPAMBOASAR IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 28 05 06 10 22 Y9 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19034 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA9 29 05 06 10 22 selected rural areas Selection DRA12CIOS19003 / Saisie des fiches de coresponsabilité scolaires Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-01- ET des états de paiements IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed 02 20 07 08 14 09 03 30 02 et mise à jour des selected rural areas Selection informations des bénéficiaires du projet TMDH dans le progiciel MIS. DRA12CIOS19002 / Saisie des fiches de coresponsabilité scolaires Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2021-01- ET des états de paiements IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed 02 20 07 08 14 09 03 30 02 et mise à jour des selected rural areas Selection informations des bénéficiaires du projet TMDH dans le progiciel MIS. DRK12CIMAJ19001 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 19 13 07 17 19 31 DES DONNEES DES MENAGES selected rural areas Selection TMDH DRA12CISOCOP19001 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 32.31 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19002 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 30.49 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19003 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 38.76 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19004 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 31.01 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19005 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 32.30 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19006 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 36.18 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19007 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 31.01 Signed soi, planification) à chaque 28 14 03 17 10 22 31 05 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19008 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 37.47 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRK12CIMAJ19002 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNEES DES MENAGES selected rural areas Selection TMDH DRA12CISOCOP19009 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 36.18 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19010 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 29.72 Signed soi, planification) à chaque 28 14 03 17 10 17 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19011 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 33.59 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19012 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 36.18 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19013 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 27.13 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19014 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 27.13 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19015 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 27.13 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19016 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 27.13 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19017 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 31.01 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19018 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 31.01 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19019 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 31.01 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19020 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 33.59 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19021 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 27.13 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19022 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 31.01 Signed soi, planification) à chaque 28 14 03 30 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19023 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 31.01 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CISOCOP19024 / Réalisation des Mesures d’Accompagnement  Coup Component 1: Building a Individual de pouce (affirmation de 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2019-12- 2020-05- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 170.00 28.48 Signed soi, planification) à chaque 28 14 03 17 10 22 31 04 28 selected rural areas Selection paiement - Bénéficiares TMDH - DIST MAHANORO ET TOAMASINA II DRA12CIASSDPEI19001 / Réalisation des Mesures d’Accompagnement Component 1: Building a Individual orientées à l’Education 2019-11- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,700.00 4,816.00 Signed Parentale pour le 28 19 03 07 24 19 28 03 27 selected rural areas Selection Développement de la Petite Enfance Intensifié (DPEI) des bénéficiaires du Programme TMDH DRA12CIASSDPEI19002 / Réalisation des Mesures d’Accompagnement Component 1: Building a Individual orientées à l’Education 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-03- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,700.00 4,817.87 Signed Parentale pour le 28 19 03 07 24 19 28 03 27 selected rural areas Selection Développement de la Petite Enfance Intensifié (DPEI) des bénéficiaires du Programme TMDH DRA12CIASSDPEI19003 / Réalisation des Mesures d’Accompagnement Component 1: Building a Individual orientées à l’Education 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-03- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,700.00 4,832.08 Signed Parentale pour le 28 19 03 07 24 19 28 03 27 selected rural areas Selection Développement de la Petite Enfance Intensifié (DPEI) des bénéficiaires du Programme TMDH DRA12CIASSDPEI19004 / Réalisation des Mesures d’Accompagnement Component 1: Building a Individual orientées à l’Education 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-03- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,700.00 4,827.19 Signed Parentale pour le 28 19 03 07 24 19 28 03 27 selected rural areas Selection Développement de la Petite Enfance Intensifié (DPEI) des bénéficiaires du Programme TMDH DRA12CIASSDPEI19005 / Réalisation des Mesures d’Accompagnement Component 1: Building a Individual orientées à l’Education 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-03- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,700.00 4,841.43 Signed Parentale pour le 28 19 03 07 24 19 28 03 27 selected rural areas Selection Développement de la Petite Enfance Intensifié (DPEI) des bénéficiaires du Programme TMDH DRA12CIASSIP19001 / Réalisation des Mesures d’Accompagnement Component 1: Building a Individual orientées à l' INCLUSION 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,700.00 4,841.43 Signed productive des 28 19 03 30 24 04 28 21 27 selected rural areas Selection bénéficiaires du Programme TMDH ,Développement bien être de la famille , AVEC et coup de pouce Page 20 DRA12CIASSIP19002 / Réalisation des Mesures d’Accompagnement Component 1: Building a Individual orientées à l' INCLUSION 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2021-01- IDA / D4340 safety net for the poor in Post Consultant Limited 5,700.00 4,840.12 Signed productive des 28 19 03 29 24 04 28 21 27 selected rural areas Selection bénéficiaires du Programme TMDH ,Développement bien être de la famille , AVEC et coup de pouce DRA11CIASSDPEIIP19002 / Réalisation des Mesures d’Accompagnement orientées à l’Education Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Parentale pour le IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,362.31 Signed 28 07 03 10 24 09 10 22 09 Développement de la Petite selected rural areas Selection Enfance Intensifié (DPEI) , DBE , AVEC, Coup de POUCE, IP des bénéficiaires du Programme ACT P DRA11CIASSDPEIIP19003 / Réalisation des Mesures d’Accompagnement orientées à l’Education Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Parentale pour le IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,160.83 Signed 28 07 03 10 24 09 10 22 09 Développement de la Petite selected rural areas Selection Enfance Intensifié (DPEI) , DBE , AVEC, Coup de POUCE, IP des bénéficiaires du Programme ACT P DRA11CIASSDPEIIP19004 / Réalisation des Mesures d’Accompagnement orientées à l’Education Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Parentale pour le IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 4,990.36 Signed 28 07 03 10 24 09 10 22 09 Développement de la Petite selected rural areas Selection Enfance Intensifié (DPEI) , DBE , AVEC, Coup de POUCE, IP des bénéficiaires du Programme ACT P DRA11CIASSDPEIIP19001 / Réalisation des Mesures d’Accompagnement orientées à l’Education Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2021-01- Parentale pour le IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 5,163.93 Signed 28 07 03 10 24 09 10 22 09 Développement de la Petite selected rural areas Selection Enfance Intensifié (DPEI) , DBE , AVEC, Coup de POUCE, IP des bénéficiaires du Programme ACT P DRK12CIMAJ19003 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 21 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH DRK12CIMAJ19004 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNEES DES MENAGES selected rural areas Selection TMDH DRK12CIMAJ19005 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 18 10 18 13 07 17 19 31 DES DONNEES DES MENAGES selected rural areas Selection TMDH DRK12CIMAJ19006 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNÉES DES MENAGES selected rural areas Selection TMDH Component 1: Building a Individual DRP82CIMAJ19035 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA9 29 05 06 10 22 selected rural areas Selection DRK12CIMAJ19007 / CONSULTANT INDIVIDUEL Component 1: Building a Individual Under 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 0.00 Implementation 05 19 10 21 13 24 17 31 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH DRK12CIMAJ19008 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-04- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH DRK12CIMAJ19009 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNEES DES MENAGES selected rural areas Selection TMDH DRK12CIMAJ19010 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH DRK12CIMAJ19011 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNES DES MÉNAGES selected rural areas Selection TMDH DRP82ASIP20001 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,487.05 Signed 29 19 18 04 19 26 08 01 07 BOVOMBE1 selected rural areas Selection DRK12CIMAJ19012 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH DRK12CIMAJ19013 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 25 13 26 17 26 31 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH DRP82ASIP20002 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,487.05 Signed 29 19 18 04 19 26 08 01 07 BOVOMBE2 selected rural areas Selection DRP82ASIP20003 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,487.05 Signed 29 19 18 04 19 26 08 01 07 BOVOMBE3 selected rural areas Selection DRK12CIMAJ19014 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 03 13 07 17 19 31 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH Component 1: Building a Individual DRP82CIMAJ19036 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA11 29 05 06 10 22 selected rural areas Selection DRK12CIMAJ19015 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-02- 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 358.75 Signed 05 19 10 07 13 07 17 19 31 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH DRP82ASIP20004 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,483.81 Signed 29 19 18 04 19 26 08 01 07 BOVOMBE4 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19037 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBELOHA12 29 05 06 10 22 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19038 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE1 29 05 06 10 22 selected rural areas Selection DRP82ASIP20005 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGANTEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,483.81 Signed 29 19 18 04 19 12 08 01 07 BOVOMBE5 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19039 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE2 29 05 06 10 22 selected rural areas Selection DRP82ASIP20006 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-05- 2019-12- 2020-05- 2020-01- 2020-05- 2021-03- ACCOMPAGNATEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,941.88 Signed 29 19 18 12 19 13 08 13 07 BOVOMBE6 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19040 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE3 29 05 06 10 22 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19041 / 2019-11- 2019-12- 2019-12- 2019-12- 2020-06- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE4 29 05 06 10 22 selected rural areas Selection DRP82ASIP20007 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,486.11 Signed 29 19 18 04 19 12 08 01 07 BOASARY1 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19043 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE6 29 05 06 10 22 selected rural areas Selection DRP82ASIP20008 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-04- 2019-12- 2020-05- 2020-01- 2020-05- 2021-03- ACCOMPAGNATEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,943.82 Signed 29 19 18 17 19 13 08 13 07 BOASARY2 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19044 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE7 29 05 06 10 22 selected rural areas Selection DRP82ASIP20009 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-04- 2019-12- 2020-05- 2020-01- 2020-05- 2021-03- ACCOMPAGNATEURIPDRPAM IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,943.82 Signed 29 19 18 17 19 13 08 13 07 BOASARY3 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19045 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE8 29 05 06 10 22 selected rural areas Selection DRK12CISOCOP19001 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 25.82 Completed 29 19 04 16 11 17 01 17 29 19 CHARGE DU COUP DE selected rural areas Selection POUCE Component 1: Building a Individual DRP82CIMAJ19046 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE9 29 05 06 10 22 selected rural areas Selection DRP82ASMACC20001 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOVOMBE1 selected rural areas Selection DRP82CIMAJ19047 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPTSIHOMBE1 IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 29 05 06 10 22 0 selected rural areas Selection DRP82ASMACC20002 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOVOMBE2 selected rural areas Selection DRP82CIMAJ19049 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPTSIHOMBE1 IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 29 05 06 10 22 2 selected rural areas Selection DRK12CISOCOP19002 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.63 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20003 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOVOMBE3 selected rural areas Selection DRP82CIMAJ19050 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPTSIHOMBE1 IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 29 05 06 10 22 3 selected rural areas Selection DRK12CISOCOP19003 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.63 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82CIMAJ19051 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPTSIHOMBE1 IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 29 05 06 10 22 4 selected rural areas Selection DRK12CISOCOP19004 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.63 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20004 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOVOMBE4 selected rural areas Selection DRK12CISOCOP19005 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.63 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19006 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.63 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82CIMAJ19053 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPTSIHOMBE1 IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 29 05 06 10 22 6 selected rural areas Selection DRK12CISOCOP19007 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20005 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOVOMBE5 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19054 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY1 29 05 06 10 22 selected rural areas Selection DRK12CISOCOP19008 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE Component 1: Building a Individual DRP82CIMAJ19055 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY2 29 05 06 10 22 selected rural areas Selection DRP82ASMACC20006 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOVOMBE6 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19056 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY3 29 05 06 10 22 selected rural areas Selection DRK12CISOCOP19009 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE Component 1: Building a Individual DRP82CIMAJ19057 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY4 29 05 06 10 22 selected rural areas Selection DRP82ASMACC20007 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOASARY1 selected rural areas Selection DRK12CISOCOP19010 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 16 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19011 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.74 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19012 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 25.86 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE Component 1: Building a Individual DRP82CIMAJ19059 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY6 29 05 06 10 22 selected rural areas Selection DRK12CISOCOP19013 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.74 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE Component 1: Building a Individual DRP82CIMAJ19060 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY7 29 05 06 10 22 selected rural areas Selection Page 21 DRP82ASMACC20008 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOASARY2 selected rural areas Selection DRK12CISOCOP19014 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE Component 1: Building a Individual DRP82CIMAJ19061 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY8 29 05 06 10 22 selected rural areas Selection DRK12CISOCOP19015 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19016 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-06- 2019-12- 2020-06- 2020-01- 2020-06- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 56.96 Signed 29 19 04 12 11 12 01 16 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20009 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,511.08 Signed 29 19 18 05 19 12 08 01 07 PAMBOASARY3 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19062 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY9 29 05 06 10 22 selected rural areas Selection DRK12CISOCOP19017 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.82 Signed 29 07 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE Component 1: Building a Individual DRP82CIMAJ19063 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY10 29 05 06 10 22 selected rural areas Selection DRK12CISOCOP19018 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE Component 1: Building a Individual DRP82CIMAJ19064 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY11 29 05 06 10 22 selected rural areas Selection DRK12CISOCOP19019 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.74 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19020 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19021 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.74 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20010 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,530.79 Signed 29 19 18 05 19 12 08 01 07 PBELOHA1 selected rural areas Selection DRK12CISOCOP19022 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20011 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,538.62 Signed 29 19 18 05 19 12 08 01 07 PBELOHA2 selected rural areas Selection DRK12CISOCOP19023 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20012 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,123.00 Signed 29 19 18 10 19 17 08 21 07 PBELOHA3 selected rural areas Selection DRK12CISOCOP19024 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.74 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20013 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,529.44 Signed 29 19 18 05 19 12 08 01 07 PTSIHOMBE1 selected rural areas Selection DRK12CISOCOP19025 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19026 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20014 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,529.44 Signed 29 19 18 05 19 12 08 01 07 PTSIHOMBE2 selected rural areas Selection DRK12CISOCOP19027 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20015 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,529.44 Signed 29 19 18 05 19 12 08 01 07 PTSIHOMBE3 selected rural areas Selection DRK12CISOCOP19028 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20016 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,529.44 Signed 29 19 18 05 19 12 08 01 07 PBEKILY1 selected rural areas Selection DRK12CISOCOP19029 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19030 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20017 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,529.44 Signed 29 19 18 05 19 12 08 01 07 PBEKILY2 selected rural areas Selection DRK12CISOCOP19031 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19032 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASMACC20018 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2021-03- ACCOMPAGNATEURMACCDR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,536.87 Signed 29 19 18 05 19 12 08 01 07 PBEKILY3 selected rural areas Selection DRK12CISOCOP19033 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.85 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASIP20010 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-03- 2021-03- ACCOMPAGNATEURIPDRPBE IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,536.33 Signed 29 19 18 04 19 13 08 30 07 LOHA1 selected rural areas Selection DRK12CISOCOP19034 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.69 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRK12CISOCOP19035 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 82.82 Signed 29 19 04 16 11 17 01 17 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASIP20011 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-03- 2021-03- ACCOMPAGNATEURIPDRPBE IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,536.33 Signed 29 19 18 04 19 13 08 30 07 LOHA2 selected rural areas Selection DRK12CISOCOP19036 / Component 1: Building a Individual 2019-11- 2020-02- 2019-12- 2020-06- 2019-12- 2020-06- 2020-01- 2020-06- 2020-06- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 25.88 Signed 29 19 04 12 11 12 01 16 29 CHARGE DU COUP DE selected rural areas Selection POUCE DRP82ASIP20012 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-03- 2021-03- ACCOMPAGNATEURIPDRPBE IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,536.33 Signed 29 19 18 04 19 13 08 30 07 LOHA3 selected rural areas Selection DRP82ASIP20013 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-03- 2021-03- ACCOMPAGNATEURIPDRPTSI IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,544.29 Signed 29 19 18 04 19 13 08 30 07 HOMBE1 selected rural areas Selection DRP82ASIP20014 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-03- 2021-03- ACCOMPAGNATEURIPDRPTSI IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,544.29 Signed 29 19 18 04 19 13 08 30 07 HOMBE2 selected rural areas Selection DRP82ASIP20015 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-03- 2019-12- 2020-03- 2020-01- 2020-03- 2021-03- ACCOMPAGNATEURIPDRPTSI IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 3,546.59 Signed 29 19 18 04 19 13 08 30 07 HOMBE3 selected rural areas Selection DRP82ASIP20016 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-05- 2019-12- 2020-05- 2020-01- 2020-05- 2021-03- ACCOMPAGNATEURIPDRPBE IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,712.15 Signed 29 19 18 11 19 14 08 26 07 KILY1 selected rural areas Selection DRP82ASIP20017 / Component 1: Building a Individual Under 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2021-03- ACCOMPAGNATEURIPDRPBE IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 0.00 Implementation 29 19 18 19 08 07 KILY2 selected rural areas Selection DRP82ASIP20018 / Component 1: Building a Individual Under 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2021-03- ACCOMPAGNATEURIPDRPBE IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 0.00 Implementation 29 19 18 19 08 07 KILY3 selected rural areas Selection DRU11CIAS19001 / Accompagnateur spécialisé dans le cadre de l'ACTP - Component 1: Building a Individual 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2022-03- Inclusion économique, IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 7,864.93 Signed 03 14 13 23 05 10 22 30 22 Développement et Bien être selected rural areas Selection de la famille - District Ankazoabo - LOT 01 DRU11CIAS19004 / Accompagnateur spécialisé dans le cadre de l'ACTP - Component 1: Building a Individual 2020-02- 2020-01- 2020-02- 2020-07- 2020-03- 2020-08- 2020-03- 2020-08- 2022-03- Inclusion économique, IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,641.69 Signed 03 14 13 20 05 17 22 28 22 Développement et Bien être selected rural areas Selection de la famille - District Ankazoabo - LOT 04 DRU11CIAS19002 / Accompagnateur spécialisé dans le cadre de l'ACTP - Component 1: Building a Individual 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2022-03- Inclusion économique, IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 6,990.64 Signed 03 14 13 23 05 10 22 30 22 Développement et Bien être selected rural areas Selection de la famille - District Ankazoabo - LOT 02 DRU11CIOS19001 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-01- 2020-12- 2020-12- Opérateur de saisie dans de IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,307.53 Completed 09 16 14 18 19 15 07 16 31 15 cadre de l'ACTP selected rural areas Selection DRU11CIOS19003 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-04- 2019-12- 2020-05- 2020-01- 2020-05- 2020-12- 2020-09- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 781.44 Completed 09 16 14 30 19 05 07 05 31 02 cadre de l'ACTP selected rural areas Selection DRU11CIOS19002 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-04- 2019-12- 2020-04- 2020-01- 2020-04- 2020-12- 2020-12- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 1,724.82 Completed 09 16 14 02 19 06 07 10 31 15 cadre de l'ACTP selected rural areas Selection DRU12CIOS19004 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-04- 2019-12- 2020-05- 2020-01- 2020-05- 2020-12- 2020-08- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 781.44 Completed 09 16 14 30 19 05 07 05 31 28 cadre du TMDH selected rural areas Selection DRU12CIOS19001 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-01- 2020-12- 2020-12- OPÉRATEUR DE SAISIE DANS IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,307.53 Completed 09 16 14 18 19 15 07 16 31 15 LE CADRE DU TMDH selected rural areas Selection DRU12CIOS19003 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-04- 2020-01- 2020-04- 2020-12- 2020-12- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 1,698.69 Completed 09 16 14 18 19 17 07 17 31 15 cadre du TMDH selected rural areas Selection DRU12CIAS19001 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- 2020-12- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,550.42 Completed dans le cadre du TMDH - 16 21 06 10 13 18 24 06 24 15 selected rural areas Selection Inclusion Productive DRU12CIAS19010 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 1,916.06 Terminated dans le cadre du TMDH- 16 21 06 17 13 18 24 06 24 selected rural areas Selection Inclusion Productive DRU12CIAS19002 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,584.78 Terminated dans le cadre du TMDH - 16 21 06 13 13 18 24 06 24 selected rural areas Selection Inclusion Productive DRU12CIAS19009 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,816.01 Terminated dans le cadre du TMDH- 16 21 06 10 13 18 24 10 24 selected rural areas Selection Inclusion Productive DRU12CIAS19003 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- 2020-12- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,673.40 Completed dans le cadre du TMDH - 16 21 06 10 13 18 24 06 24 15 selected rural areas Selection Inclusion Productive DRU12CIAS19008 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- 2020-12- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,971.00 Completed dans le cadre du TMDH- 16 21 06 10 13 18 24 06 24 17 selected rural areas Selection Inclusion Productive DRU12CIAS19004 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- 2020-12- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,849.86 Completed dans le cadre du TMDH - 16 21 06 10 13 18 24 10 24 17 selected rural areas Selection Inclusion Productive DRU12CIAS19007 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- 2020-12- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,936.61 Completed dans le cadre du TMDH- 16 21 06 10 13 18 24 06 24 17 selected rural areas Selection Inclusion Productive DRU12CIAS19005 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- 2020-12- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,932.14 Completed dans le cadre du TMDH - 16 21 06 10 13 18 24 06 24 17 selected rural areas Selection Inclusion Productive DRU12CISOCOP19001 / Component 1: Building a Individual 2019-12- 2020-02- 2020-01- 2020-05- 2020-01- 2020-05- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 29.81 Signed 04 14 07 07 20 08 27 25 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CIAS19006 / Component 1: Building a Individual Accompagnateur spécialisé 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-03- 2022-01- 2020-12- IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 4,790.87 Completed dans le cadre du TMDH- 16 21 06 14 13 18 24 10 24 17 selected rural areas Selection Inclusion Productive DRU12CISOCOP19002 / Component 1: Building a Individual 2019-12- 2020-02- 2020-01- 2020-05- 2020-01- 2020-05- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 29.81 Signed 04 14 07 05 20 08 27 25 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19003 / Component 1: Building a Individual 2019-12- 2020-02- 2020-01- 2020-05- 2020-01- 2020-05- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 24.63 Signed 04 14 07 07 20 08 27 25 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19004 / Component 1: Building a Individual 2019-12- 2020-02- 2020-01- 2020-05- 2020-01- 2020-05- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 24.63 Signed 04 14 07 07 20 08 27 25 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19005 / Component 1: Building a Individual 2019-12- 2020-02- 2020-01- 2020-05- 2020-01- 2020-05- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 24.63 Signed 04 14 07 07 20 08 27 25 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19008 / Component 1: Building a Individual 2019-12- 2020-02- 2020-01- 2020-05- 2020-01- 2020-05- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 29.81 Signed 04 14 07 07 20 08 27 25 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19006 / Component 1: Building a Individual 2019-12- 2020-02- 2020-01- 2020-05- 2020-01- 2020-05- 2020-01- 2020-05- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 24.63 Signed 04 14 07 07 20 08 27 25 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CIMAJ19001 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 677.07 Signed 09 21 06 07 10 17 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CIMAJ19006 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 822.62 Signed 09 21 06 07 10 17 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY Page 22 DRU12CIMAJ19007 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 798.89 Signed 09 21 06 07 10 17 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CIMAJ19002 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 744.64 Signed 09 21 06 07 10 17 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CIMAJ19008 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-03- 2020-01- 2020-03- 2020-01- 2020-03- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 694.63 Signed 09 21 06 11 10 13 17 13 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CIMAJ19003 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 770.63 Signed 09 21 06 07 10 17 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CIMAJ19009 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 622.25 Terminated 09 21 06 07 10 17 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CIMAJ19004 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 725.41 Signed 09 21 06 07 10 17 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CIMAJ19010 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 731.65 Signed 09 21 06 07 10 07 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CIMAJ19005 / CONSULTANT INDIVIDUEL Component 1: Building a Individual 2019-12- 2019-12- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- CHARGE DE LA MISE A JOUR IDA / D4340 safety net for the poor in Post Consultant Limited 850.00 772.83 Signed 09 21 06 12 10 17 17 26 17 DES DONNÉES DES MÉNAGES selected rural areas Selection TMDH BETIOKY DRU12CICMP19001 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,288.03 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19034 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2019-12- 2020-01- 2020-01- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 0.00 Canceled du ciblage des bénéficiaires 09 19 06 13 10 selected rural areas Selection TMDH Toliary II DRU12CICMP19002 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,108.10 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19033 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2019-12- 2020-01- 2020-01- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 0.00 Canceled du ciblage des bénéficiaires 09 19 06 13 10 selected rural areas Selection TMDH Toliary II DRU12CICMP19003 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,005.55 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19032 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2019-12- 2020-01- 2020-01- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 0.00 Canceled du ciblage des bénéficiaires 09 19 06 13 10 selected rural areas Selection TMDH Toliary II DRU12CICMP19031 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2019-12- 2020-01- 2020-01- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 0.00 Canceled du ciblage des bénéficiaires 09 19 06 13 10 selected rural areas Selection TMDH Toliary II DRU12CICMP19030 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2019-12- 2020-01- 2020-01- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 0.00 Canceled du ciblage des bénéficiaires 09 19 06 13 10 selected rural areas Selection TMDH Toliary II DRU12CICMP19029 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2019-12- 2020-01- 2020-01- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 0.00 Canceled du ciblage des bénéficiaires 09 19 06 13 10 selected rural areas Selection TMDH Toliary II DRU12CICMP19028 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 870.96 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19027 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,230.22 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19004 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,022.45 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19005 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 715.12 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19026 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 772.22 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19006 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,076.73 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19025 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 736.16 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19024 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 863.07 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19007 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,010.73 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19023 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 725.50 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19008 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 764.84 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 14 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19022 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 744.14 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19009 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 806.02 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 14 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19021 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 704.73 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19010 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,047.65 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 14 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19020 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 834.52 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19011 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,152.49 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 14 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19019 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 713.08 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19012 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 904.61 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 14 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19018 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 982.47 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19013 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 727.05 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 14 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19017 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,145.14 Completed du ciblage des bénéficiaires 09 14 19 21 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19014 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 813.03 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 14 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19016 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,273.44 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 13 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19015 / Component 1: Building a Individual Consultant Individuel chargé 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 1,750.00 1,044.38 Completed du ciblage des bénéficiaires 09 14 19 17 06 21 14 26 10 04 selected rural areas Selection TMDH Toliary II DRU12CICMP19035 / Consultant Individuel Chef Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-07- d'équipe chargé du ciblage IDA / D4340 safety net for the poor in Post Consultant Limited 2,625.00 1,420.39 Completed 09 14 19 17 06 20 14 26 10 28 des bénéficiaires TMDH selected rural areas Selection Toliary II DRU12CICMP19037 / Consultant Individuel chef Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-07- d'équipe chargé du ciblage IDA / D4340 safety net for the poor in Post Consultant Limited 2,625.00 1,404.81 Completed 09 14 19 17 06 20 14 26 10 28 des bénéficiaires TMDH selected rural areas Selection Toliary II DRU12CICMP19036 / Consultant Individuel Chef Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- 2020-07- d'équipe chargé du ciblage IDA / D4340 safety net for the poor in Post Consultant Limited 2,625.00 1,441.17 Completed 09 14 19 17 06 20 14 26 10 28 des bénéficiaires TMDH selected rural areas Selection Toliary II DRU12CICMP19038 / Consultant Individuel chef Component 1: Building a Individual 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-04- d'équipe chargé du ciblage IDA / D4340 safety net for the poor in Post Consultant Limited 2,625.00 1,010.19 Terminated 09 14 19 17 06 20 14 26 10 des bénéficiaires TMDH selected rural areas Selection Toliary II DRK11CIOSACTP19002 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2021-01- OPÉRATEUR DE SAISIE DANS IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,078.75 Signed 09 18 14 18 21 31 11 07 05 LE CADRE DE L'ACTP selected rural areas Selection DRU11CIAS19003 / Accompagnateur spécialisé dans le cadre de l'ACTP - Component 1: Building a Individual 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2022-03- Inclusion économique, IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 6,165.19 Signed 03 14 13 23 05 10 22 30 22 Développement et Bien être selected rural areas Selection de la famille - District Ankazoabo - LOT 03 DRU12CI0S19002 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-08- 2020-01- 2020-08- 2020-12- 2020-12- OPÉRATEUR DE SAISIE DANS IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 830.30 Completed 09 16 14 18 19 17 07 24 31 15 LE CADRE DU TMDH selected rural areas Selection DRU12CIOS19002 / Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-01- 2020-08- 2020-12- Opérateur de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,307.53 Completed 09 16 14 18 04 15 08 16 06 15 cadre du TMDH selected rural areas Selection DG20SCICOMMUNICATION2 Component 1: Building a Individual 0001 / Consultant Pending 2019-12- 2019-12- 2020-01- 2020-02- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Open 5,000.00 0.00 Individuel - Assistance Implementation 03 29 19 23 21 selected rural areas Selection Technique en communication DG20SCIDESSINATEUR2000 Component 1: Building a Individual Under 2020-01- 2020-11- 2020-01- 2020-02- 2020-03- 2020-12- 1 / Consultant Individuel - IDA / D4340 safety net for the poor in Post Consultant Limited 2,000.00 0.00 Implementation 20 19 25 15 21 31 Dessinateur selected rural areas Selection DG20CIEMSING2001 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-03- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 1,792.21 Signed de l'Equipe Mobile de administration, monitoring 27 07 01 18 22 06 28 09 26 Selection Soutien - Ingénieur N°01 and social accountability DG20CIEMSSO2001 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 1,911.42 Signed de l'Equipe Mobile de administration, monitoring 27 07 01 07 22 03 28 04 26 Selection Soutien - Socio- and social accountability Organisateur N°01 DG20CIEMSSO2002 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-02- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 1,922.08 Signed de l'Equipe Mobile de administration, monitoring 27 07 01 07 22 03 28 06 26 Selection Soutien - Socio- and social accountability Organisateur N°02 DG20CIEMSSO2003 / Component 1: Building a Individual Recrutement des membres 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-03- 2020-03- 2020-07- IDA / D4340 safety net for the poor in Post Consultant Limited 1,000.00 1,929.62 Signed de l'Equipe Mobile de 27 07 01 18 22 06 28 09 26 selected rural areas Selection Soutien - Socio- Organisateur N°03 DG20CIEMSSO2004 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 1,844.15 Signed de l'Equipe Mobile de administration, monitoring 27 07 01 27 22 06 28 09 26 Selection Soutien - Socio- and social accountability Organisateur N°04 DG20CIEMSSO2005 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 1,558.44 Signed de l'Equipe Mobile de administration, monitoring 27 07 01 27 22 06 28 09 26 Selection Soutien - Socio- and social accountability Organisateur N°05 DG20CIEMSSO2006 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 1,564.56 Signed de l'Equipe Mobile de administration, monitoring 27 07 01 27 22 06 28 09 26 Selection Soutien - Socio- and social accountability Organisateur N°06 DG20CIEMSSO2007 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 1,558.44 Signed de l'Equipe Mobile de administration, monitoring 27 07 01 27 22 06 28 09 26 Selection Soutien - Socio- and social accountability Organisateur N°07 DG20CIEMSSO2008 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 1,922.08 Signed de l'Equipe Mobile de administration, monitoring 27 07 01 27 22 06 28 09 26 Selection Soutien - Socio- and social accountability Organisateur N°08 DG20CIEMSSO2009 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Socio- and social accountability Organisateur N°09 DG20CIEMSSO2010 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Socio- and social accountability Organisateur N°10 DG20CIEMSSO2011 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Socio- and social accountability Organisateur N°03 DG20CIEMSSO2012 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Socio- and social accountability Organisateur N°12 Page 23 DG20CIEMSSO2013 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Socio- and social accountability Organisateur N°13 DG20CIEMSSO2014 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Socio- and social accountability Organisateur N°14 DG20CIEMSSO2015 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Socio- and social accountability Organisateur N°15 DG20CIEMSING2002 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 07 01 07 22 03 28 26 Selection Soutien - Ingénieur N°02 and social accountability DG20CIEMSING2003 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Ingénieur N°03 and social accountability DG20CIEMSING2004 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Ingénieur N°04 and social accountability DG20CIEMSING2005 / Component 2: Individual Recrutement des membres Strengthening safety net 2020-01- 2020-02- 2020-02- 2020-03- 2020-07- IDA / 57080 Post Consultant Limited 1,000.00 0.00 Canceled de l'Equipe Mobile de administration, monitoring 27 01 22 28 26 Selection Soutien - Ingénieur N°05 and social accountability Component 1: Building a Individual DRP81CIMACC20001 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-05- 2020-02- 2020-05- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,234.30 Signed MACC PSRC1 08 25 17 10 17 02 20 07 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20002 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-05- 2020-02- 2020-05- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,234.30 Signed MACC PSRC2 08 25 17 10 17 02 20 07 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20003 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-05- 2020-02- 2020-05- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,233.69 Signed MACC PSRC3 08 25 17 10 17 02 20 07 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20004 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-05- 2020-02- 2020-05- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,233.69 Signed MACC PSRC4 08 25 17 10 17 02 20 07 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20005 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-05- 2020-02- 2020-05- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,233.69 Signed MACC PSRC5 08 25 17 10 17 02 20 07 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20006 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-05- 2020-02- 2020-05- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,233.69 Signed MACC PSRC6 08 25 17 09 17 02 20 07 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20007 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-04- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed MACC PSRC7 08 25 17 10 17 28 20 30 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20008 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-04- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed MACC PSRC8 08 25 17 10 17 28 20 30 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20009 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-04- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 1,162.35 Signed MACC PSRC9 08 25 17 09 17 20 20 29 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20010 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-04- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 1,162.35 Signed MACC PSRC10 08 25 17 10 17 20 20 29 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20011 / CI 2020-02- 2020-02- 2020-02- 2020-02- 2020-02- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 0.00 Canceled MACC PSRC11 08 25 17 17 20 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20012 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-04- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 1,162.35 Signed MACC PSRC12 08 25 17 10 17 20 20 29 18 selected rural areas Selection Component 1: Building a Individual DRP81CIMACC20013 / CI 2020-02- 2020-02- 2020-02- 2020-04- 2020-02- 2020-04- 2020-02- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 2,500.00 2,324.70 Signed MACC PSRC13 08 25 17 10 17 20 20 29 18 selected rural areas Selection DRP82CIMAJ190053 / RECRUTEMENT DE 53 Component 1: Building a Individual CONSULTANTS INDIVIDUELS 2020-02- 2019-12- 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- IDA / D4340 safety net for the poor in Post Consultant Limited 19,555.20 11,732.99 Signed EN CHARGE DE LA MISE A 27 23 03 29 18 02 08 05 28 selected rural areas Selection JOUR DES MÉNAGES BÉNÉFICIAIRES TMDH DRU13CICIB20001 / Prestation de service de 50 Consultants Individuels de ciblage des Bénéficiaires Component 1: Building a Individual 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- dans les Communes IDA / D4340 safety net for the poor in Post Consultant Limited 10,416.67 219.56 Completed 04 02 06 06 09 06 09 10 21 24 d'Androka, Ankiliabo selected rural areas Selection (District d'Ampanihy) et Tameantsoa (District de Betioky) - TMNC POST SECHERESSE DRU13ASMACC20001 / Prestation de service de 10 Consultants Accompagnateurs Component 1: Building a Individual Spécialisés en mesures 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2020-03- 2020-04- 2020-09- 2020-09- IDA / D4340 safety net for the poor in Post Consultant Limited 20,000.00 1,786.14 Completed d'accompagnement des 04 10 09 16 13 24 20 30 16 28 selected rural areas Selection Bénéficiaires dans les Communes d'Androka, Ankiliabo (District Ampanihy) et Tameantsoa (District Betioky sud) - TMNC DRT12CIMAJ19015 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 0.00 Canceled 16 21 28 18 07 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19016 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 0.00 Canceled 16 21 28 18 07 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19017 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 0.00 Canceled 16 21 28 18 07 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19018 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 0.00 Canceled 16 21 28 18 07 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19019 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 0.00 Canceled 16 21 28 18 07 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRT12CIMAJ19020 / Component 2: Consultant individuel chargé Individual Strengthening safety net 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- de la mise à jour des IDA / D4340 Post Consultant Limited 300.00 0.00 Canceled administration, monitoring 16 21 28 18 07 informations sur les Selection and social accountability ménages bénéficiaires du TMDH DRT12CIMAJ19021 / Consultant individuel chargé Component 1: Building a Individual 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- de la mise à jour des IDA / D4340 safety net for the poor in Post Consultant Limited 300.00 0.00 Canceled 16 21 28 18 07 informations sur les selected rural areas Selection ménages bénéficiaires du TMDH DRP81CICIBLAGE20003 / Recrutement de 23 Consultants Individuels chargé de ciblage et Component 1: Building a Individual Enregistrement des 2020-03- 2020-01- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- 2020-03- IDA / D4340 safety net for the poor in Post Consultant Limited 2,800.00 914.16 Signed bénéficiaires PSRC vague 2 12 13 16 04 16 04 17 05 23 selected rural areas Selection dans les Communes Andranobory, Sampona, Maroalopoty, Maroalomainty et Faux cap DG20CI_2017_SIGVEHIC / Prestation d'un spécialiste Component 1: Building a Individual Pending 2020-04- 2020-04- 2020-05- 2020-05- 2020-08- en développement web : IDA / D4340 safety net for the poor in Post Consultant Limited 3,000.00 0.00 Implementation 03 17 01 15 13 Conception d'un système de selected rural areas Selection gestion des véhicules du FID. DG20CI_2018_SIGVEHIC / Prestation d'un spécialiste Component 1: Building a Individual Pending 2020-04- 2020-04- 2020-05- 2020-05- 2020-08- en développement mobile : IDA / D4340 safety net for the poor in Post Consultant Limited 3,000.00 0.00 Implementation 03 17 01 15 13 Conception d'un système de selected rural areas Selection gestion des véhicules du FID. DRP81CIMACC20014 / Six (06) Consultants Individuels chargés d'accompagnement Component 1: Building a Individual des bénéficiaires PSRC 2020-03- 2020-02- 2020-03- 2020-04- 2020-03- 2020-04- 2020-04- 2020-05- 2020-08- IDA / D4340 safety net for the poor in Post Consultant Limited 15,000.00 6,972.84 Signed vague 2, dans les 27 25 30 10 31 21 01 11 31 selected rural areas Selection communes Faux cap, Sampona, Andranobory, Maroalopoty et Maroalomainty. DG20ED_COVID_AGEX2001 / Prestation de services de Component 3: Building the l’AGEX chargée de la institutional capacity for 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- supervision du ciblage des IDA / D4340 coordination, monitoring Post Direct Selection Direct 5,000.00 6,851.04 Signed 10 08 17 08 01 24 30 bénéficiaires des TMNC and evaluation of the social comme réponse au Covid19 protection syst em – CUA 2ème arrondissement DG20ED_COVID_AGEX2003 / Prestation de services de Component 3: Building the l’AGEX chargée de la institutional capacity for 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- supervision du ciblage des IDA / D4340 coordination, monitoring Post Direct Selection Direct 5,000.00 6,264.92 Signed 10 08 17 08 01 24 30 bénéficiaires des TMNC and evaluation of the social comme réponse au Covid19 protection syst em – CUA 3ème arrondissement DG20ED_COVID_AGEX2004 / Prestation de services de Component 3: Building the l’AGEX chargée de la institutional capacity for 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- supervision du ciblage des IDA / D4340 coordination, monitoring Post Direct Selection Direct 5,000.00 7,325.83 Signed 10 08 17 08 01 24 30 bénéficiaires des TMNC and evaluation of the social comme réponse au Covid19 protection syst em – CUA 5ème arrondissement DG20ED_COVID_AGEX2006 / Prestation de services de Component 3: Building the l’AGEX chargée de la institutional capacity for 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- supervision du ciblage des IDA / D4340 coordination, monitoring Post Direct Selection Direct 5,000.00 7,455.32 Signed 10 08 17 08 01 24 30 bénéficiaires des TMNC and evaluation of the social comme réponse au Covid19 protection syst em – CUA 6ème arrondissement DG20ED_COVID_CABVALID2 001 / Prestation de services Component 3: Building the d’un cabinet chargé de la institutional capacity for validation et de la 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- IDA / D4340 coordination, monitoring Post Direct Selection Direct 35,000.00 2,853.91 Signed synchronisation des 10 06 17 08 01 17 30 and evaluation of the social données de recensement protection syst em bénéficiaires des TMNC comme réponse au Covid19 DRA20ED COVID19 AGEX 20001 / Prestation de l’AGEX chargée pour la mise en œuvre et la Component 1: Building a supervision de l’opération 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-06- IDA / D4340 safety net for the poor in Post Direct Selection Direct 7,300.00 7,084.65 Signed de recensement des 16 14 23 22 30 22 04 selected rural areas ménages bénéficiaires des TMNC comme réponse au Covid19 - CUT - 28 FKT - ARRONDISSEMENT ANJOMA ET MORARANO DRA20ED COVID19 AGEX 20002 / Prestation de l’AGEX chargée pour la mise en œuvre et la Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-06- supervision de l’opération IDA / D4340 safety net for the poor in Post Direct Selection Direct 4,100.00 3,985.70 Signed 16 14 23 21 30 22 04 de recensement des selected rural areas ménages bénéficiaires des TMNC comme réponse au Covid19 - CUT - 10 FKT - ARRONDISSEMENT ANKIRIHIRY DRA20ED COVID19 AGEX 20003 / Prestation de l’AGEX chargée pour la mise en œuvre et la supervision de l’opération Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-06- de recensement des IDA / D4340 safety net for the poor in Post Direct Selection Direct 5,200.00 5,522.51 Signed 16 14 23 21 30 22 04 ménages bénéficiaires des selected rural areas TMNC comme réponse au Covid19 - 16 FKT - ARRONDISSEMENT ANKIRIHIRY ET COMMUNE SUBURBAINE DE TOAMASINA DRA20ED COVID19 AGEX 20004 / Prestation de l’AGEX chargée pour la mise en œuvre et la Component 1: Building a supervision de l’opération 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-06- IDA / D4340 safety net for the poor in Post Direct Selection Direct 6,280.00 6,089.61 Signed de recensement des 16 14 23 21 30 22 04 selected rural areas ménages bénéficiaires des TMNC comme réponse au Covid19 - CUT - 19 FKT - ARRONDISSEMENT MORARANO DRA20ED COVID19 AGEX 20005 / Prestation de l’AGEX chargée pour la mise en œuvre et la Component 1: Building a supervision de l’opération 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-06- IDA / D4340 safety net for the poor in Post Direct Selection Direct 9,580.00 9,286.14 Signed de recensement des 16 14 23 21 30 22 04 selected rural areas ménages bénéficiaires des TMNC comme réponse au Covid19 - CUT 43 FKT - ARRONDISSEMENT TANAMBAO V ET AMBODIMANGA DRA20ED COVID19 AGEX 20006 / Prestation de l’AGEX chargée pour la mise en œuvre et la Component 1: Building a supervision de l’opération 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-06- IDA / D4340 safety net for the poor in Post Direct Selection Direct 7,930.00 7,688.03 Signed de recensement des 16 14 23 21 30 22 04 selected rural areas ménages bénéficiaires des TMNC comme réponse au Covid19 - CUT - 34 FKT - ARRONDISSEMENT ANKIRIHIRY ET AMBODIMANGA DRF20ED_COVID_AGEX 2001 / Prestation de services de l’AGEX chargée Component 3: Building the de la supervision du ciblage institutional capacity for 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- des bénéficiaires des TMNC IDA / D4340 coordination, monitoring Post Direct Selection Direct 2,000.00 1,787.47 Signed 16 14 23 17 29 24 29 comme réponse au Covid19 and evaluation of the social – CUF – Arrondissement protection syst em Andrainjato atsimo et Andrainjato avaratra DRF20ED_COVID_AGEX 2004 / Prestation de services de l’AGEX chargée Component 1: Building a de la supervision du ciblage 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- IDA / D4340 safety net for the poor in Post Direct Selection Direct 2,000.00 1,711.81 Signed des bénéficiaires des TMNC 16 14 23 16 29 23 29 selected rural areas comme réponse au Covid19 – CUF - Arrondissement Tanana Ambony DRF20ED_COVID_AGEX 2005 / Prestation de services de l’AGEX chargée Component 1: Building a de la supervision du ciblage 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- IDA / D4340 safety net for the poor in Post Direct Selection Direct 5,000.00 4,398.69 Signed des bénéficiaires des TMNC 16 14 23 16 29 24 29 selected rural areas comme réponse au Covid19 – District de Lalangina – Axe Alakamisy Ambohimaha DRF20ED _COVID_AGEX 2006 / Prestation de services de l’AGEX chargée Component 1: Building a de la supervision du ciblage 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- IDA / D4340 safety net for the poor in Post Direct Selection Direct 5,000.00 3,914.27 Signed des bénéficiaires des TMNC 16 14 23 16 29 24 29 selected rural areas comme réponse au Covid19 – District de Lalangina Axe Ambalakely DG20ED_COVID_AGEX2007 / Prestation de services de l’AGEX chargée de la supervision du ciblage des bénéficiaires des TMNC Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- comme réponse au Covid19 IDA / D4340 safety net for the poor in Post Direct Selection Direct 10,000.00 19,830.26 Signed 20 14 27 16 11 28 10 – Antananarivo selected rural areas Atsimondrano : ANDOHARANOFOTSY, TANJOMBATO, ANKARAOBATO, ANDRANONAHOATRA Page 24 DG20ED_COVID_AGEX2008 / Prestation de services de l’AGEX chargée de la supervision du ciblage des bénéficiaires des TMNC Component 1: Building a comme réponse au Covid19 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- IDA / D4340 safety net for the poor in Post Direct Selection Direct 10,000.00 19,435.96 Signed – Antananarivo 20 14 27 16 11 28 10 selected rural areas Atsimondrano : ANOSIZATO ANDREFANA, AMPITATAFIKA, AMBOHIDRAPETO, ITAOSY, ALAKAMISY FENOARIVO, FIOMBONANA, ANKADIMANGA DG20ED_COVID_AGEX2009 / Prestation de services de l’AGEX chargée de la supervision du ciblage des Component 1: Building a bénéficiaires des TMNC 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- IDA / D4340 safety net for the poor in Post Direct Selection Direct 10,000.00 15,295.48 Signed comme réponse au Covid19 20 14 27 16 11 29 10 selected rural areas – Ambohidratrimo : AMBOHITRIMANJAKA, AMBOHIDRATRIMO, ANTEHIROKA DG20ED_COVID_AGEX2010 / Prestation de services de l’AGEX chargée de la supervision du ciblage des Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- bénéficiaires des TMNC IDA / D4340 safety net for the poor in Post Direct Selection Direct 10,000.00 15,639.00 Signed 20 14 27 16 11 28 10 comme réponse au Covid19 selected rural areas – Ambohidratrimo : ANOSIALA, AMBATOLAMPY, IVATO, TALATAMATY DG20ED_COVID_AGEX2011 / Prestation de services de l’AGEX chargée de la supervision du ciblage des Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- bénéficiaires des TMNC IDA / D4340 safety net for the poor in Post Direct Selection Direct 10,000.00 13,406.34 Signed 20 14 27 16 11 28 10 comme réponse au Covid19 selected rural areas – Antananarivo Avaradrano : SABOTSY NAMEHANA, ANKADIKELY ILAFY DG20ED_COVID_AGEX2012 / Prestation de services de l’AGEX chargée de la supervision du ciblage des Component 1: Building a 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- bénéficiaires des TMNC IDA / D4340 safety net for the poor in Post Direct Selection Direct 10,000.00 18,103.08 Signed 20 14 27 16 11 28 10 comme réponse au Covid19 selected rural areas – Antananarivo Avaradrano : AMBOHIMANAMBOLA, ALASORA DG20ED_COVID_AGEX2005 / Prestation de services de Component 3: Building the l’AGEX chargée de la institutional capacity for supervision du ciblage des 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-06- IDA / D4340 coordination, monitoring Post Direct Selection Direct 5,000.00 6,267.70 Signed bénéficiaires des TMNC 10 08 17 08 01 24 30 and evaluation of the social comme réponse au Covid19 protection syst em – CUA 5ème et 6ème arrondissements DG20ED_COVID_AGEX2002 / Prestation de services de l’AGEX chargée de la Component 1: Building a supervision du ciblage des 2020-04- 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-06- IDA / D4340 safety net for the poor in Post Direct Selection Direct 5,000.00 6,737.25 Signed bénéficiaires des TMNC 10 08 17 08 01 24 30 selected rural areas comme réponse au Covid19 – CUA 2ème et 3ème arrondissements DRF20ED-COVID-AGEX 2002 / Prestation de services de l’AGEX chargée Component 1: Building a de la supervision du ciblage 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Direct Selection Direct 2,000.00 2,180.42 Signed des bénéficiaires des TMNC 23 14 03 16 07 24 06 selected rural areas comme réponse au Covid19 – CUF Arrondissement Lalazana , Manolafaka et Vatosola DRF20ED_COVID_AGEX 2003 / Prestation de services de l’AGEX chargée Component 1: Building a de la supervision du ciblage 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- 2020-04- 2020-08- IDA / D4340 safety net for the poor in Post Direct Selection Direct 2,000.00 2,040.84 Signed des bénéficiaires des TMNC 23 14 03 16 07 23 06 selected rural areas comme réponse au Covid19 – CUF – Arrondissement Tanana Ambany DRU13CIOS20001 / PRESTATION DE SERVICE DE CONSULTANT INDIVIDUEL, OPÉRATEUR DE SAISIE DANS Component 1: Building a Individual 2020-04- 2019-12- 2020-04- 2020-04- 2020-05- 2020-05- 2020-05- 2020-05- 2020-11- 2020-08- LES COMMUNES D'ANDROKA IDA / D4340 safety net for the poor in Post Consultant Limited 1,250.00 781.44 Completed 22 16 27 30 04 04 12 04 08 28 ET ANKILIABO (DISTRICT selected rural areas Selection AMPANIHY) ET TAMEANTSOA (DISTRICT DE BETIOKY) - TMNC POST SECHERESSE DRF11CIAS19007 / PRESTATION DE 02 CONSULTANTS INDIVIDUELS Component 1: Building a Individual 2020-05- 2020-02- 2020-05- 2020-03- 2020-05- 2020-04- 2020-07- 2020-04- 2021-07- ACCOMPAGNATEURS IDA / D4340 safety net for the poor in Post Consultant Limited 20,000.00 5,632.42 Signed 04 06 09 13 30 15 04 30 04 SPECIALISES POUR LE selected rural areas Selection PROGRAMME ACTP DANS LE DISTRICT DE MANANDRIANA Component 1: Building a Individual DRP82CIMAJ19042 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPTSIHOMBE5 29 05 06 10 22 selected rural areas Selection DRP82CIOS20006 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-01- 2021-03- OPERATEURDESAISIEDRPAMB IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 0.00 Canceled 28 09 16 08 07 OASARY2 selected rural areas Selection DRP82CIOS20005 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-01- 2020-02- OPERATEURDESAISIEDRPAMB IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 0.00 Canceled 28 09 16 08 19 OASARY1 selected rural areas Selection DRP82CIMAJ19048 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPTSIHOMBE1 IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 29 05 06 10 22 1 selected rural areas Selection DRP82CIOS20012 / CI Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2020-01- 2021-03- OPERATEUR DE SAISIE IDA / D4340 safety net for the poor in Post Consultant Limited 2,916.67 0.00 Canceled 29 09 16 08 07 TSIHOMBE 3 selected rural areas Selection DRP82CIMAJ19052 / Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- CIMISEAJOURDRPTSIHOMBE1 IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled 29 05 06 10 22 5 selected rural areas Selection Component 1: Building a Individual DRP82CIMAJ19058 / 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- IDA / D4340 safety net for the poor in Post Consultant Limited 305.55 0.00 Canceled CIMISEAJOURDRPBEKILY5 29 05 06 10 22 selected rural areas Selection DRK12CIASTMDH20001 / CONSULTANT INDIVIDUEL CHARGE DES MESURES Component 1: Building a Individual Pending 2020-07- 2020-07- 2020-08- 2020-09- 2021-09- D'ACCOMPAGNEMENT POUR IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 0.00 Implementation 13 18 08 12 12 LE TRANSFERT MONÉTAIRE selected rural areas Selection POUR LE DÉVELOPPEMENT HUMAIN (TMDH) DRA12CISOMAJ19015 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 0.00 Canceled 28 20 03 06 10 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DRA12CISOMAJ19016 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 0.00 Canceled 28 03 06 10 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DRA12CISOMAJ19017 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 0.00 Canceled 28 03 06 10 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DRU12CIEI20001 / CONSULTANTS CHARGES DE Component 1: Building a Individual Pending 2020-07- 2020-08- 2020-08- 2020-08- 2020-10- L’ENQUÊTE POUR IDA / D4340 safety net for the poor in Post Consultant Open 25,200.00 0.00 Implementation 15 11 21 26 15 ÉVALUATION D'IMPACT EN selected rural areas Selection DPEI- TMDH A TOLIARA II DRU12CIEI20002 / CONSULTANTS CHARGES DE Component 1: Building a Individual LA SUPERVISION DE Pending 2020-07- 2020-08- 2020-08- 2020-08- 2020-10- IDA / D4340 safety net for the poor in Post Consultant Open 4,100.00 0.00 L’ENQUÊTE POUR Implementation 15 11 21 26 15 selected rural areas Selection ÉVALUATION D'IMPACT EN DPEI- TMDH TOLIARA II DG20_CI_SYST_PAIEMENT_2 003 / Consultant en charge Component 2: de la mise en place du Individual Strengthening safety net 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- 2020-09- 2020-09- 2020-12- système intégré de IDA / D4340 Post Consultant Open 10,000.00 16,631.24 Signed administration, monitoring 22 20 26 31 09 18 30 22 29 paiement électronique du Selection and social accountability projet FSS dans toutes les zones d’intervention du FID DRK11CIASACTP2001 / CONSULTANTS INDIVIDUELS CHARGES DE LA MISE EN OEUVRE DES MESURES D'ACCOMPAGNEMENT DES BÉNÉFICIAIRES DU Component 1: Building a Individual Pending 2020-07- 2020-08- 2020-08- 2020-09- 2021-09- PROGRAMME FILETS IDA / D4340 safety net for the poor in Post Consultant Open 24,000.00 0.00 Implementation 29 18 21 08 08 SOCIAUX PRODUCTIFS DU selected rural areas Selection FONDS D'INTERVENTION POUR LE DÉVELOPPEMENT DANS LE DISTRICT DE MANAKARA _ 04 ACCOMPAGNATEURS SPECIALISES DRA12CISOMAJ19018 / MISE A JOUR DES Component 1: Building a Individual 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- INFORMATIONS DES IDA / D4340 safety net for the poor in Post Consultant Limited 510.00 0.00 Canceled 28 20 03 06 10 24 MENAGES BENEFICIAIRES selected rural areas Selection TMDH DISTRICT TOAMASINA II ET MAHANORO DG20ED_COVID_AGEX2013 / Prestations de services des Agences chargées de la Component 1: Building a supervision des deuxièmes 2020-08- 2020-07- 2020-08- 2020-07- 2020-09- 2020-08- 2020-12- IDA / D4340 safety net for the poor in Post Direct Selection Direct 100,000.00 93,874.63 Signed paiements des TMNC 03 27 10 31 21 24 20 selected rural areas comme réponse au Covid19 – Antananarivo suburbaines - réparties en 06 lots. DG20_ED_MAINTENANCE_MI Component 2: S_2001 / Consultant en Strengthening safety net 2020-08- 2020-06- 2020-08- 2020-08- 2020-09- 2020-09- 2021-09- charge de la maintenance IDA / D4340 Post Direct Selection Direct 10,000.00 12,563.66 Signed administration, monitoring 03 22 10 11 07 28 07 du système d'information and social accountability du FID (Logiciel MIS) DRA12 EDCISOCOP 20001 / Consultants Individuels chargé de la délivrance des Component 1: Building a coups de pouce (SOCOP) Under 2020-08- 2020-02- 2020-08- 2020-08- 2020-08- 2020-09- IDA / D4340 safety net for the poor in Post Direct Selection Direct 1,000.00 0.00 aux bénéficiaires des Implementation 05 19 14 13 20 19 selected rural areas Transferts Monétaires pour le Développement Humain (TMDH) DG20_CI_PLAINTECOVID201 Component 1: Building a Individual 9 / Consultant Individuel 2020-08- 2020-06- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-10- IDA / D4340 safety net for the poor in Post Consultant Limited 2,000.00 721.60 Signed chargé du traitement des 10 30 10 14 24 18 31 19 31 selected rural areas Selection plaintes sur le TOSIKA FAMENO DG20_ED_EMSCOVID2016 / Consultants Individuels chargés de la supervision et le suivi des activités Component 1: Building a Individual 2020-08- 2020-07- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-10- Transferts Monétaires Non IDA / D4340 safety net for the poor in Post Consultant Direct 20,000.00 10,229.66 Signed 10 30 17 14 24 17 31 18 31 Conditionnels à selected rural areas Selection Antananarivo (Communes Urbaine et Périphériques) _ Sept (07) consultants Individuels DRU12CISOCOP19007 / Component 1: Building a Individual 2019-12- 2020-01- 2020-01- 2020-01- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 0.00 Canceled 04 07 20 27 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19011 / Component 1: Building a Individual 2019-12- 2020-01- 2020-01- 2020-01- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 0.00 Canceled 04 07 20 27 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19009 / Component 1: Building a Individual 2019-12- 2020-01- 2020-01- 2020-01- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 0.00 Canceled 04 07 20 27 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19012 / Component 1: Building a Individual 2019-12- 2020-01- 2020-01- 2020-01- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 0.00 Canceled 04 07 20 27 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRU12CISOCOP19010 / Component 1: Building a Individual 2019-12- 2020-01- 2020-01- 2020-01- 2020-07- CONSULTANT INDIVIDUEL IDA / D4340 safety net for the poor in Post Consultant Limited 166.00 0.00 Canceled 04 07 20 27 25 CHARGE DU COUP DE selected rural areas Selection POUCE DRT11CIAS20001 / Recrutement de 06 Component 1: Building a Individual Under 2020-08- 2020-01- 2020-10- 2020-10- 2020-11- 2021-11- Accompagnateurs IDA / D4340 safety net for the poor in Post Consultant Open 35,027.00 0.00 Implementation 28 29 02 23 06 06 Spécialisés dans le cadre du selected rural areas Selection FSP à Antanifotsy et à Arivonimamo DRT11CIOS20001 / Recrutement de deux (02) Component 1: Building a Individual Pending 2020-09- 2020-10- 2020-10- 2020-11- 2021-11- Opérateurs de saisie dans le IDA / D4340 safety net for the poor in Post Consultant Limited 4,865.00 0.00 Implementation 21 05 19 02 02 cadre du FSP dans le District selected rural areas Selection d’Arivonimamo DRF11CIOS20001 / Component 1: Building a Individual Recrutement d'un Opérateur 2020-09- 2020-09- 2020-09- 2020-10- 2020-09- 2020-10- 2020-10- 2020-11- 2021-10- IDA / D4340 safety net for the poor in Post Consultant Limited 5,000.00 2,379.87 Signed de saisie pour le 18 08 23 28 28 29 05 02 05 selected rural areas Selection programme ACTP Manandriana DRF11CIAS20001 / Recrutement de 05 Component 1: Building a Individual 2020-09- 2020-09- 2020-10- 2020-10- 2020-10- 2020-10- 2020-11- 2020-10- 2021-11- Accompagnateurs IDA / D4340 safety net for the poor in Post Consultant Open 70,000.00 27,319.69 Signed 05 11 10 20 31 29 28 30 28 Spécialisés dans le cadre du selected rural areas Selection programme ’ACTP : Manandriana DRA12 CIASSDPEI 20001 / Recrutement des Component 1: Building a Individual Under 2020-09- 2021-01- 2020-11- 2020-11- 2020-12- 2021-12- Accompagnateurs IDA / D4340 safety net for the poor in Post Consultant Open 5,700.00 0.00 Implementation 14 20 02 17 04 04 Spécialisés chargés des selected rural areas Selection mesures d’accompagnement - TMDH DG20_CI_THEATRE_RADIO_2 Component 1: Building a Individual 017 / Recrutement de Under 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-08- IDA / D4340 safety net for the poor in Post Consultant Open 1,500.00 0.00 consultant chargé de Implementation 26 19 23 13 10 09 selected rural areas Selection l'écriture théatre radiophonique DG20_CI_ED_PLAINTE_TF_20 20 / Consultant Individuel Component 1: Building a Individual 2020-10- 2020-10- 2020-10- 2020-10- 2020-11- 2020-10- 2020-11- 2020-11- 2021-01- chargé du traitement des IDA / D4340 safety net for the poor in Post Consultant Direct 2,000.00 1,419.25 Signed 12 21 22 23 05 28 12 04 11 plaintes sur le TOSIKA selected rural areas Selection FAMENO DRU12CIAS20001 / Consultant Individuel, Component 1: Building a Individual Accompagnateur Spécialisé 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2020-11- 2021-01- 2020-11- 2021-07- IDA / D4340 safety net for the poor in Post Consultant Limited 1,600.00 1,015.78 Signed en Inclusion Productive dans 06 19 11 05 02 19 06 19 05 selected rural areas Selection le cadre du programme TMDH à Betioky Sud et Toliara II DRK11CISAI18003 / SAISIE Component 1: Building a Individual 2019-01- 2019-03- 2019-04- 2019-05- 2019-11- DES DONNES DANS MIS DES IDA / 57080 safety net for the poor in Post Consultant Open 1,645.47 0.00 Canceled 24 14 04 09 05 BENEFICIAIRES TMDH selected rural areas Selection DRU12CIAS20002 / Recrutement d’un Consultant Individuel, Component 1: Building a Individual 2020-11- 2021-01- 2020-11- 2020-12- 2020-11- 2020-12- 2020-11- 2021-01- 2020-12- 2021-02- Accompagnateur Spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 750.00 1,131.68 Completed 11 06 16 15 17 17 19 06 31 26 en Mesures selected rural areas Selection d'accompagnement dans le cadre du programme TMDH à Betioky Sud et Toliara II DRP20_ED_KERE_TMNC2001 / Sélection d'Agences d'Exécution (AGEX) chargées du ciblage, l’enregistrement Component 1: Building a et le paiement des Pending 2020-11- 2020-11- 2020-12- 2021-06- IDA / D4340 safety net for the poor in Post Direct Selection Direct 50,000.00 0.00 bénéficiaires de Transfert Implementation 11 23 21 19 selected rural areas Monétaire Non Conditionnels comme réponse à la Crise Alimentaire et Nutritionnelle dans le district Amboasary DRF_ED_12CIAS 2002 TMDH / Recrutement de 05 Component 1: Building a Individual Accompagnateurs 2020-12- 2021-01- 2020-12- 2021-01- 2020-12- 2021-01- 2021-01- 2021-04- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Direct 34,000.00 29,654.76 Signed Spécialisés dans le cadre du 01 11 11 14 16 15 05 01 31 selected rural areas Selection programme TMDH dans le district d'Ambohimahasoa DRF_ED_12CIOS 2002 / Component 1: Building a Individual Recrutement de 07 2020-12- 2021-01- 2020-12- 2020-12- 2020-12- 2020-12- 2021-01- 2021-01- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Direct 18,666.67 11,915.55 Signed Consultants Individuels 01 04 11 15 16 21 05 06 31 selected rural areas Selection Opérateurs de Saisie DRT12 ED CIOS 20001 / Component 1: Building a Individual Recrutement de dix (10) Pending 2020-12- 2020-12- 2020-12- 2021-01- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Direct 29,160.00 0.00 opérateurs de saisie dans le Implementation 01 12 29 01 31 selected rural areas Selection cadre du FSP et du TMDH. Page 25 DRT12 ED CIAS 20001 / Recrutement de douze (12) Component 1: Building a Individual Pending 2020-12- 2020-12- 2020-12- 2021-01- 2021-12- accompagnateurs IDA / D4340 safety net for the poor in Post Consultant Direct 87,996.00 0.00 Implementation 01 12 29 01 31 spécialisés dans le cadre du selected rural areas Selection TMDH à Faratsiho et à Betafo. DRT11 ED CFCIC20001 / Cabinet chargé de l'appui au Component 1: Building a Pending 2020-11- 2020-12- 2021-01- 2021-02- ciblage communautaire des IDA / D4340 safety net for the poor in Post Direct Selection Direct 9,342.00 0.00 Implementation 30 12 01 15 activités ACTP dans le selected rural areas District d'Arivonimamo. DRT11 ED CFPLAN 20001 / Component 1: Building a Pending 2020-11- 2020-12- 2021-01- 2021-02- Agence de planification de IDA / D4340 safety net for the poor in Post Direct Selection Direct 27,993.00 0.00 Implementation 30 12 01 15 l'ACTP Arivonimamo. selected rural areas DRT12 CIAS 20001 / Recrutement de deux (02) Component 1: Building a Individual Pending 2020-12- 2020-12- 2020-12- 2021-01- 2021-12- accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 14,666.00 0.00 Implementation 08 09 24 01 31 dans le cadre du TMDH à selected rural areas Selection Betafo. DRA11ED CIOS 20011 / Component 1: Building a Individual Recrutement de SIX (06 ) Under 2020-12- 2021-03- 2020-12- 2021-01- 2021-01- 2022-01- IDA / D4340 safety net for the poor in Post Consultant Direct 15,000.00 0.00 opérateurs de saisie dans le Implementation 02 21 12 02 31 31 selected rural areas Selection cadre du FSP et du TMDH. DRA12ED CI ASS 20012 / Recrutement de six (06) Component 1: Building a Individual accompagnateurs Pending 2020-12- 2020-12- 2020-12- 2021-01- 2022-01- IDA / D4340 safety net for the poor in Post Consultant Direct 36,000.00 0.00 spécialisés dans le cadre du Implementation 01 11 21 05 05 selected rural areas Selection TMDH à MAHANORO et TOAMASINA II DRU12CIAS21001 / Recrutement des Component 1: Building a Individual Consultants individuels AS 2020-11- 2021-01- 2020-12- 2020-12- 2020-12- 2020-12- 2021-01- 2021-01- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Direct 53,900.00 6,012.70 Signed en charge de mesures 28 06 08 15 13 15 06 06 31 selected rural areas Selection d'accompagnement TMDH - Betioky Sud et Toliara II (nombre: 07) DRU12CIAS21002 / Recrutement des Consultants individuels Component 1: Building a Individual 2020-11- 2021-01- 2020-12- 2020-12- 2020-12- 2020-12- 2021-01- 2021-01- 2022-03- Accompagnateurs IDA / D4340 safety net for the poor in Post Consultant Direct 23,100.00 5,793.11 Signed 28 06 08 14 13 14 06 06 31 Spécialisés en charge des selected rural areas Selection Inclusions productives TMDH - Betioky Sud et Toliara II (nombre: 03) DRU12CIOS21001 / Recrutement des Component 1: Building a Individual Consultants individuels 2020-11- 2020-12- 2020-12- 2021-01- 2020-12- 2021-01- 2021-01- 2021-01- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Direct 17,400.00 2,840.72 Signed Opérateurs de saisie - 28 15 08 06 13 06 06 06 31 selected rural areas Selection TMDH Betioky Sud, Toliara II et FSP Ankazoabo Sud (nombre: 06) DRU11CIAS21001 / Recrutement des Consultants individuels Component 1: Building a Individual Under 2020-11- 2021-02- 2020-12- 2020-12- 2021-01- 2022-03- Accompagnateurs IDA / D4340 safety net for the poor in Post Consultant Direct 27,000.00 0.00 Implementation 28 01 08 13 06 31 Spécialisés en charge des selected rural areas Selection mesures d'accompagnement FSP - Ankazoabo Sud (nombre: 04) DRP82CIOS21001 / Component 1: Building a Individual Recrutement des 11 Under 2020-11- 2021-01- 2020-12- 2020-12- 2021-01- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Direct 31,000.00 0.00 Opérateurs de Saisie TMDH Implementation 28 14 08 14 07 31 selected rural areas Selection FIAVOTA DRP82ASMACC21001 / Recrutement des 18 Accompagnateurs Component 1: Building a Individual spécialisés chargés de Pending 2020-11- 2020-12- 2020-12- 2021-01- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Direct 121,000.00 0.00 Mesure d'accompagnement Implementation 28 08 14 08 31 selected rural areas Selection pour le Transfert Monétaire pour le Développement Humain (TMDH) DRP82ASIP21001 / Recrutement des 18 Accompagnateurs Component 1: Building a Individual spécialisés en charge de Pending 2020-11- 2020-12- 2020-12- 2021-01- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Direct 155,000.00 0.00 l'inclusion Productive pour Implementation 28 08 14 08 31 selected rural areas Selection le Transfert Monétaire pour le Développement Humain (TMDH) DRK12EDCIASIP21001 / Recrutement de deux Component 1: Building a Individual Pending 2020-12- 2020-12- 2020-12- 2021-01- 2021-12- (02)Accompagnateurs IDA / D4340 safety net for the poor in Post Consultant Direct 12,800.00 0.00 Implementation 02 13 30 02 28 spécialisés chargé de selected rural areas Selection l'inclusion productive TMDH DRK12EDCIOS21001 / Component 1: Building a Individual Recrutement des sept (07) Pending 2020-12- 2020-12- 2021-01- 2021-01- 2022-01- IDA / D4340 safety net for the poor in Post Consultant Direct 18,600.00 0.00 Opérateurs de saisie TMDH Implementation 02 13 03 06 01 selected rural areas Selection et FSP DRK12EDCIASMACC21001 / Recrutement cinq (05) Component 1: Building a Individual Pending 2020-12- 2020-12- 2020-12- 2021-01- 2021-12- Accompagnateurs IDA / D4340 safety net for the poor in Post Consultant Direct 31,800.00 0.00 Implementation 02 13 30 02 28 spécialisés de la selected rural areas Selection composante TMDH du District de Vohipeno DRF_CIOS 2003 / Recrutement de 03 Component 1: Building a Individual Under 2021-01- 2021-01- 2021-01- 2021-01- 2021-01- 2022-03- Opérateurs de Saisie pour le IDA / D4340 safety net for the poor in Post Consultant Limited 7,500.00 0.00 Implementation 08 13 13 18 28 31 programme FSP Isandra et selected rural areas Selection TMDH Ambohimahasoa DRA11CIASSDPEIIP20002 / Recrutement d'accompagnateur spécialisé pour la Réalisation des Mesures Component 1: Building a Individual d’Accompagnement Pending 2021-01- 2021-01- 2021-02- 2021-03- 2021-09- IDA / D4340 safety net for the poor in Post Consultant Limited 6,000.00 0.00 orientées à l’Education Implementation 19 24 14 21 17 selected rural areas Selection Parentale pour le Développement de la Petite Enfance Intensifié (DPEI) , DBE , AVEC, Coup de POUCE, IP des bénéficiaires du Programme ACT P DRA 12 CIASS 20002 / Recrutement 01 Component 1: Building a Individual Under 2021-01- 2021-03- 2021-02- 2021-02- 2021-02- 2022-02- accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Open 5,700.00 0.00 Implementation 12 22 05 10 18 18 en MACC pour le TMDH selected rural areas Selection Mahanoro et Toamasina II DRK12CIAS21001 / Recrutement d'un(e) Component 1: Building a Individual Under 2021-01- 2021-05- 2021-02- 2021-02- 2021-02- 2022-03- Accompagnateur Spécialisé IDA / D4340 safety net for the poor in Post Consultant Open 6,802.84 0.00 Implementation 18 27 07 10 28 31 TMDH. Date fin contrat selected rural areas Selection prévue Mars 2022 DRF_12CIAS 2003 TMDH / Recrutement d'un Component 1: Building a Individual Accompagnateur Spécialisé 2021-01- 2021-01- 2021-01- 2021-03- 2021-01- 2021-03- 2021-01- 2021-03- 2021-04- IDA / D4340 safety net for the poor in Post Consultant Limited 1,666.67 530.14 Signed Temporaire pour le 08 18 13 02 18 03 28 03 28 selected rural areas Selection programme TMDH- District Ambohimahasoa DRF_12CIASIP 2004 TMDH / Recrutement de 02 Accompagnateurs Component 1: Building a Individual 2021-01- 2021-01- 2021-01- 2021-03- 2021-01- 2021-03- 2021-02- 2021-03- 2022-03- Spécialisés Inclusion IDA / D4340 safety net for the poor in Post Consultant Limited 13,333.33 10,973.90 Signed 13 13 18 02 28 03 12 03 31 productive dans le cadre du selected rural areas Selection programme TMDH dans le district d’Ambohimahasoa DRA CIOS 20001 / Recrutement de 05 Component 1: Building a Individual Under 2021-01- 2021-05- 2021-02- 2021-02- 2021-02- 2022-02- Opérateurs de saisie pour IDA / D4340 safety net for the poor in Post Consultant Open 13,140.00 0.00 Implementation 12 07 03 05 11 11 TMHD Mahanoro - selected rural areas Selection Toamasina II et FSP Vatomandry DRT11 CIAS 21001 / Recrutement d'un Component 1: Building a Individual Pending 2021-02- 2021-02- 2021-02- 2021-02- 2022-03- accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 4,427.00 0.00 Implementation 08 16 22 25 31 dans le cadre du FSP à selected rural areas Selection Arivonimamo. DRF_11CIAS 2005 FSP / Component 1: Building a Individual Recrutement Under 2021-02- 2021-06- 2021-02- 2021-02- 2021-03- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Limited 7,777.77 0.00 Accompagnateur Spécialisé Implementation 09 17 14 24 20 31 selected rural areas Selection dans le cadre du programme FSP Isandra DRA_ED_AGEX_TMNC_PC_M AROANTSETRA_21001 / Prestations d'une Agence d'Exécution (AGEX) chargée Component 1: Building a du ciblage, de Under 2021-02- 2021-03- 2021-02- 2021-03- 2021-04- IDA / D4340 safety net for the poor in Post Direct Selection Direct 15,000.00 0.00 l'enregistrement et des Implementation 10 22 17 17 16 selected rural areas paiements des bénéficiaires de TMNC/PC dans le district de Maroantsetra Région Atsinanana. DG_CI_FORMATEUR_SECURI TE_21004 / Recrutement Component 1: Building a Individual Under 2021-03- 2021-04- 2021-03- 2021-03- 2021-05- 2021-10- d'un consultant individuel IDA / D4340 safety net for the poor in Post Consultant Limited 10,000.00 0.00 Implementation 01 12 06 27 01 28 chargé de la formation en selected rural areas Selection secourisme et en sécurité routière DG_CI_ED_MANUEL_TMURBA IN_21005 / Recrutement Component 1: Building a Individual Under 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-07- d'un consultant individuel IDA / D4340 safety net for the poor in Post Consultant Direct 5,000.00 0.00 Implementation 01 03 15 05 19 18 chargé de l'élaboration du selected rural areas Selection Manuel de Transfert Urbain DRK11CIOSFSP21001 / Component 1: Building a Individual Recrutement de deux (02 ) Under 2021-01- 2021-05- 2021-01- 2021-01- 2021-02- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Limited 5,669.03 0.00 opérateurs de saisie dans le Implementation 08 27 13 20 10 31 selected rural areas Selection cadre du FSP. DRK11CIAS21001 / Component 1: Building a Individual Recrutement d'un Under 2021-01- 2021-06- 2021-02- 2021-02- 2021-02- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Open 6,802.84 0.00 Consultant Individuel Implementation 18 16 07 10 28 31 selected rural areas Selection Accompagnateur spécialisé FSP. DRU12CIAS21004 / Accompagnateurs Spécialisés en charge des Component 1: Building a Individual mesures d'accompagnement Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Limited 24,500.00 0.00 des Bénéficiaires dans le Implementation 19 19 20 15 01 31 selected rural areas Selection cadre du programme FSP Ankazoabo Sud et TMDH à Betioky Sud ou Toliara II (nombre: 03) DRA 12 CIASS 21001 / Recrutement 01 Component 1: Building a Individual Under 2021-03- 2021-03- 2021-03- 2021-03- 2021-04- 2022-03- accompagnateur spécialisé IDA / D4340 safety net for the poor in Post Consultant Open 5,100.00 0.00 Implementation 04 22 26 30 05 01 en MACC pour le TMDH selected rural areas Selection Mahanoro et Toamasina II DG_21009_CI_PILOT_SEC_SY S / Recrutement d'un Component 1: Building a Individual consultant individuel chargé Under 2021-03- 2021-04- 2021-05- 2021-05- 2021-06- 2021-12- IDA / D4340 safety net for the poor in Post Consultant Open 10,000.00 0.00 du pilotage de la mise en Implementation 26 19 14 28 18 15 selected rural areas Selection place des recommandations pour la sécurité informatique du FID DRF_21004_SCI_AS_FSP / Recrutement d' un (01) Component 1: Building a Individual Under 2021-03- 2021-06- 2021-03- 2021-04- 2021-04- 2022-03- Accompagnateur Spécialisé IDA / D4340 safety net for the poor in Post Consultant Limited 6,486.48 0.00 Implementation 22 17 27 01 11 30 pour le programme FSP selected rural areas Selection Manandriana DRA_21001_ SCI _ASIP _MACC / Recrutement 01 Component 1: Building a Individual accompagnateur spécialisé Under 2021-05- 2021-06- 2021-05- 2021-05- 2021-07- 2022-01- IDA / D4340 safety net for the poor in Post Consultant Limited 4,800.00 0.00 en mesures Implementation 05 23 10 31 05 01 selected rural areas Selection d'accompagnement - Inclusion Productive TMDH Mahanoro et Toamasina II DRK_21002_SCI_OS_TMDH Component 1: Building a Individual Pending 2021-05- 2021-05- 2021-05- 2021-06- 2021-12- / Recrutement d'un IDA / D4340 safety net for the poor in Post Consultant Limited 500.00 0.00 Implementation 06 11 18 08 31 opérateur de saisie TMDH. selected rural areas Selection DRU_21004_CI_OSMISFSP / Component 1: Building a Individual Recrutement d'un Opérateur Pending 2021-06- 2021-07- 2021-07- 2021-07- 2022-03- IDA / D4340 safety net for the poor in Post Consultant Open 2,160.00 0.00 de saisie sur MIS- FSP Implementation 01 04 09 10 31 selected rural areas Selection Ankazoabo Sud Page 26 KG Financial Sector Development Project (P125689) PROCUREMENT Kyrgyz Republic : KG Financial Sector Development Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P125689 GPN Date: Project Name: KG Financial Sector Development Project Loan / Credit No: IDA / 50670, IDA / H7600 Project Coordination Unit under Kyrgyz Post Office Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening the legal, FSDP/KPO/ICB/2.1.3/2016 / regulatory, and supervisory Single Stage - One Supply of Compact Cash IDA / 50670 Prior Request for Bids Open - International 0.00 172,000.00 Signed 2016-09-15 2016-09-30 framework for banks, MFOs, Envelope Transport Cars and credit unions FSDP/CCRO/ICB/3.1.1/2016 Strengthening the legal, / Information system for regulatory, and supervisory Single Stage - One modernization of the Unified IDA / 50670 Prior Request for Bids Open - International 0.00 293,569.83 Signed 2016-09-07 2016-09-30 framework for banks, MFOs, Envelope State Register of claims on and credit unions movable property FSDP/KPO/ICB/2.1.2 / Postal Strengthening the legal, technology on 550 locations regulatory, and supervisory Single Stage - One IDA / 50670 Prior Request for Bids Open - International 0.00 2,901,515.00 Signed 2018-06-22 2018-09-27 to expand access to financial framework for banks, MFOs, Envelope services and credit unions FSDP/GOODS-3.1.14 / Modernizing the secured Procurement of air Request for Single Stage - One IDA / H7600 transactions and debt Post Limited 5,500.00 6,041.58 Completed 2019-12-28 2020-03-09 2020-02-22 2020-03-18 2020-04-12 2020-04-23 conditioning system for server Quotations Envelope resolution regime room FSDP/GOOD-3.1.15 / Modernizing the secured Request for Single Stage - One Procurement of fire and IDA / H7600 transactions and debt Post Limited 4,500.00 3,534.63 Completed 2019-12-07 2020-02-17 2020-02-01 2020-02-20 2020-03-22 2020-05-12 Quotations Envelope security alarm systems resolution regime FSDP/GOODS-3.1.11. / Enhancing financial services Request for Single Stage - One Procurement of goods for IDA / H7600 Post Open - National 23,000.00 5,300.00 Completed 2020-01-04 2020-02-29 2020-05-06 2020-06-01 2020-06-09 via KPOs network Quotations Envelope server room with installation FSDP/CCRO/SH/3.3.6 / Printing Materials for Modernizing the secured information activity on Request for Single Stage - One IDA / H7600 transactions and debt Post Open - National 4,000.00 3,638.87 Completed 2020-01-21 2020-03-17 2020-01-08 2020-06-25 2020-06-09 updated information system Quotations Envelope resolution regime "United public register of collateral property" FSDP/KPO/SH/2.1.9 / Procurement of equipment for Enhancing financial services Request for Single Stage - One IDA / 50670 Post Open - National 50,000.00 38,527.51 Completed 2020-01-18 2020-02-26 2020-03-14 2020-05-08 2020-06-25 2020-10-19 server room including related via KPOs network Quotations Envelope materials. FSDP/KPO/SH/2.1.11 / Procurement of computer and Enhancing financial services Single Stage - One IDA / 50670 Post Request for Bids Open - National 140,000.00 104,372.41 Completed 2020-01-20 2020-01-24 2020-01-25 2020-03-07 2020-02-21 2020-04-06 2020-03-18 2020-05-11 2020-06-02 2020-06-30 2020-08-07 office equipment for Kyrgyz via KPOs network Envelope Post office FSDP/CCRO/SH/3.3.8 / Procurement of office furniture for the Ministry of Justice- the main implementing Agency for the Modernizing the secured Request for Single Stage - One component 3. The main IDA / H7600 transactions and debt Post Open - National 13,500.00 6,896.98 Completed 2020-03-04 2020-04-29 2020-04-20 2020-10-26 2020-07-29 Quotations Envelope beneficiar is the office of resolution regime registration of moveable collateral and debt resolution office and other related units of the MoJ FSDP/CCRO/SH/3.3.7 / Modernizing the secured Request for Single Stage - One Procurement of equipment for IDA / H7600 transactions and debt Post Open - National 52,500.00 51,783.80 Completed 2020-03-04 2020-04-08 2020-10-08 2020-06-30 2020-11-26 Quotations Envelope MJ and for archive room resolution regime FSDP/KPO/SH/2.1.10 / Procurement of computing equipment: wi-fi routers, hard Enhancing financial services Request for Single Stage - One disks and other goods for the IDA / 50670 Post Open - National 25,000.00 0.00 Canceled 2020-01-18 2020-03-14 2020-06-30 via KPOs network Quotations Envelope server equipment for the information system to be supplied by BAIP. FSDP/KPO/SH/2.1.12 / Enhancing financial services Request for Single Stage - One Procurement of Multifuctional IDA / H7600 Post Open - International 78,000.00 70,851.77 Completed 2020-10-15 2020-11-26 2020-11-30 2021-01-15 2021-01-06 via KPOs network Quotations Envelope Printers for KPO IT system FSDP/MJ/2020/SH/2.3.20 / Modernizing the secured Procurement of office Request for Single Stage - One IDA / 50670 transactions and debt Post Open - National 2,000.00 1,196.45 Completed 2020-10-20 2020-12-15 2020-11-13 2021-01-14 2020-12-23 furniture: informational stand Quotations Envelope resolution regime and reception desk FSDP/CCRO/SH/3.3.9 / Modernizing the secured Under Procurement for Component 3 Request for Single Stage - One IDA / 50670 transactions and debt Post Open - National 42,000.00 0.00 Implementati 2020-11-14 2020-12-06 2020-12-31 a technical equipment: PC, Quotations Envelope resolution regime on MFU, notebooks, printers etc. Page 1 FSDP/NCB/2.1.13 / Under Enhancing financial services Single Stage - One Procurement of equipment for IDA / H7600 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2021-02-18 2021-02-16 2021-02-23 2021-02-16 2021-03-16 2021-03-09 2021-03-30 2021-04-13 2021-05-13 via KPOs network Envelope KPO on IDA/FSDP/G/RFQ/2021/1 / Pending Procurement of computers, Enhancing financial services Request for Single Stage - One IDA / H7600 Post Open - National 60,000.00 0.00 Implementati 2021-06-21 2021-06-28 2021-07-15 POS computers, scanners, via KPOs network Quotations Envelope on printers, termoprinters NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FSDP/NCS-3.3.11 / Archive Modernizing the secured Request for Single Stage - One digitalization services for IDA / H7600 transactions and debt Post Open - National 24,000.00 12,688.43 Completed 2020-02-04 2020-02-26 2020-03-10 2020-06-22 2020-06-11 Quotations Envelope Component 3 resolution regime FSDP/NCS-2.3.19 / Data Enhancing financial services Request for Single Stage - One entry and verification services IDA / H7600 Post Open - National 15,000.00 0.00 Canceled 2020-02-03 2020-03-03 2020-06-22 via KPOs network Quotations Envelope in 1C IDA/FSDP/NCS/SSS/2021/2 / Procurement of internet Pending Enhancing financial services services of OJSC IDA / H7600 Post Direct Selection Direct 10,000.00 0.00 Implementati 2021-05-14 2021-05-19 2021-05-24 2021-06-30 via KPOs network "Kyrgyztelecom" for KPO post on offices CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FSDP/CS/2.2.2/2015 / Strengthening the legal, Capacity Building in Financial regulatory, and supervisory Quality And Cost- IDA / 50670 Prior Open - International 0.00 674,434.17 Signed 2016-03-06 2016-03-14 Management for Kyrgyz Post framework for banks, MFOs, Based Selection Office and credit unions Strengthening the legal, Consultant FSDP/CS/CQ/2.3.2/2014 / regulatory, and supervisory IDA / 50670 Prior Qualification Open - International 0.00 67,424.00 Signed 2014-10-28 2014-10-28 Market and economic research framework for banks, MFOs, Selection and credit unions Strengthening the legal, FSDP/LCS/4.5/2014 / Project regulatory, and supervisory Least Cost Audit for years: 2014, 2015, IDA / 50670 Prior Open - International 0.00 60,111.00 Signed 2015-05-20 2015-05-21 framework for banks, MFOs, Selection 2016, 2017 and 2018 and credit unions FSDP/CS/2.2.4/2017 / AUDIT Strengthening the legal, OF THE KYRGYZ POST OFFICE regulatory, and supervisory Least Cost AS OF AND FOR THE YEARS IDA / 50670 Prior Open - International 0.00 196,000.00 Signed 2018-10-22 2018-11-12 framework for banks, MFOs, Selection ENDING DECEMBER 31, 2016 and credit unions AND DECEMBER 31, 2017 FSDP/LCS/4.6/2019 / Project Project coordination and Least Cost IDA / H7600 Post Open - International 24,000.00 17,244.44 Signed 2019-12-17 2019-06-24 2020-01-07 2020-02-20 2019-10-22 2020-03-19 2019-11-25 2020-04-18 2019-12-10 2020-05-23 2019-12-16 2020-06-27 2020-01-16 2020-12-24 Audit for 2019-2020 monitoring Selection FSDP/CS-CQS/2.3.12 / Improving financial services Consultant Enhancing financial services management" of 100 IDA / 50670 Post Qualification Open - National 25,000.00 15,940.00 Signed 2020-01-16 2019-09-06 2020-02-06 2020-03-21 2019-12-16 2020-04-20 2020-01-09 2020-05-25 2020-01-10 2020-06-30 via KPOs network employees of the SE "Kyrgyz Selection Post Office" FSDP/CCRO/SQS/3.3.5 / Procurement of video Modernizing the secured Consultant materials on introduction of IDA / H7600 transactions and debt Post Qualification Open - National 6,000.00 4,200.00 Completed 2020-01-28 2020-02-13 2020-02-18 2020-10-20 2020-03-24 2020-04-20 2020-03-30 2020-04-02 2020-04-28 2020-10-19 2020-09-28 updated information system resolution regime Selection "United public register of collateral property". FSDP/CS-CQS/2.3.14 / Consultant Enhancing financial services Consultant on internal IDA / H7600 Post Qualification Open - National 35,000.00 0.00 Canceled 2019-12-25 2019-10-28 2019-12-27 2020-01-13 2020-01-27 2020-02-02 2020-06-26 via KPOs network normative acts for KPO Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FSDP/CCRO/CS/IC/3.3.3 / IT- Strengthening the legal, Individual specialist for Central regulatory, and supervisory IDA / 50670 Prior Consultant Open 0.00 90,000.00 Signed 2014-07-18 2014-07-30 Collateral Registration Office framework for banks, MFOs, Selection (CCRO) and credit unions Strengthening the legal, Individual FSD/IT-2/2014 / PCU IT regulatory, and supervisory IDA / 50670 Prior Consultant Open 0.00 9,299.37 Signed 2014-09-23 2014-09-29 Specialist framework for banks, MFOs, Selection and credit unions FSDP/CS/1.3.1/2014 / Strengthening the legal, Individual Individual Consultant on regulatory, and supervisory IDA / 50670 Prior Consultant Open 0.00 110,455.56 Signed 2014-11-03 2014-11-10 functional and technical framework for banks, MFOs, Selection requirements and credit unions Strengthening the legal, FSD/ME/2014 / Project Individual regulatory, and supervisory monitoring and evaluation IDA / 50670 Prior Consultant Open 0.00 53,424.74 Signed 2014-04-29 2014-05-12 framework for banks, MFOs, specialist Selection and credit unions Strengthening the legal, Individual FSD/DS/2014 / PCU regulatory, and supervisory IDA / 50670 Prior Consultant Open 0.00 40,464.49 Signed 2014-10-14 2014-10-20 Disbursement specialist framework for banks, MFOs, Selection and credit unions Page 2 Strengthening the legal, FSD/OMT/2014 / Office- Individual regulatory, and supervisory manager/translator of the IDA / 50670 Prior Consultant Open 0.00 16,557.56 Terminated 2014-03-25 2014-03-25 framework for banks, MFOs, PCU Selection and credit unions Strengthening the legal, FSDP/CCRO/CS/IC/3.3.1 / Individual regulatory, and supervisory Local Legal Consultant for IDA / 50670 Prior Consultant Open 0.00 94,050.00 Signed 2014-07-07 2014-07-09 framework for banks, MFOs, CCRO Selection and credit unions Strengthening the legal, Individual FSD/SPS/2016 / Senior regulatory, and supervisory IDA / 50670 Prior Consultant Open 0.00 25,947.10 Signed 2016-02-21 2016-03-01 procurement specialist framework for banks, MFOs, Selection and credit unions Strengthening the legal, FSDP/CS/2.3.1/2014 / Individual regulatory, and supervisory Individual ICT Management IDA / 50670 Prior Consultant Open 0.00 82,666.67 Signed 2014-12-30 2014-12-25 framework for banks, MFOs, Consultant Selection and credit unions Strengthening the legal, Individual FSD/IT/2014 / PCU IT- regulatory, and supervisory IDA / 50670 Prior Consultant Open 0.00 10,207.61 Signed 2014-07-18 2014-08-04 SPECIALIST framework for banks, MFOs, Selection and credit unions Strengthening the legal, Individual FSDP/CCRO/CS/IC/3.3.2 / regulatory, and supervisory IDA / 50670 Prior Consultant Open 0.00 97,405.56 Signed 2015-03-12 2015-03-25 International IT-consultant framework for banks, MFOs, Selection and credit unions Strengthening the legal, Individual FSD/IT-3/2015 / PCU IT- regulatory, and supervisory IDA / 50670 Prior Consultant Open 0.00 47,153.92 Signed 2015-04-24 2015-05-04 specialist framework for banks, MFOs, Selection and credit unions Strengthening the legal, FSD/CS/2018 / ICT regulatory, and supervisory IDA / 50670 Prior Direct Selection Direct 0.00 22,222.22 Signed 2018-03-06 Consultant framework for banks, MFOs, and credit unions FSDP/CS/2.2.7/2020 / Audit of the KPO’s financial Enhancing financial services IDA / H7600 Post Direct Selection Direct 55,000.00 55,000.00 Completed 2019-12-19 2019-12-23 2019-12-24 2020-01-15 2019-12-31 2020-01-21 2020-05-29 2020-12-31 statements for the year via KPOs network ending December 31, 2019 FSDP/CS/2.2.2/2019 / Finalization of capacity Enhancing financial services IDA / H7600 Post Direct Selection Direct 175,015.00 175,015.00 Completed 2020-02-03 2019-10-03 2020-02-29 2019-11-18 2020-04-01 2020-03-13 2020-06-25 2020-09-03 building in Financial via KPOs network Management for KPO FSDP/IC/2.3.17 / Individiual Individual Consultant: assitant to Enhancing financial services IDA / H7600 Post Consultant Open 9,496.00 7,931.46 Completed 2020-01-08 2019-11-08 2020-02-26 2019-11-26 2020-03-18 2019-11-22 2020-04-22 2020-01-08 2020-06-30 2020-07-29 External expert on Agency via KPOs network Selection banking KPO FSDP/IC/2.3.18 / Expert trainer (Consultant) on conducting, organizing and providing training on the Individual Enhancing financial services topic: “Effective customer IDA / 50670 Post Consultant Open 6,330.00 0.00 Canceled 2020-01-14 2020-03-03 2020-03-24 2020-04-02 2020-06-30 via KPOs network service” within the advanced Selection course "Capacity building of employees in financial services management" FSDP/IC/FM-2.3.15 / 2nd Individual Enhancing financial services Consultant on financial IDA / H7600 Post Consultant Limited 6,245.00 0.00 Canceled 2019-12-10 2019-10-02 2019-12-14 2019-12-28 2020-01-02 2020-05-15 via KPOs network management Selection FSDP/IC/2.3.20 / Expert trainer - trainer on Individual conducting, organizing and Enhancing financial services IDA / 50670 Post Consultant Open 6,330.00 0.00 Canceled 2020-01-14 2020-03-03 2020-03-24 2020-04-01 2020-06-30 providing training on the via KPOs network Selection topic: "Financial accounting. 1C Accounting" FSDP/IC/2.3.21 / Expert- trainer on conducting, organizing and providing Individual Enhancing financial services training on the topic: IDA / 50670 Post Consultant Open 6,330.00 0.00 Canceled 2020-01-15 2020-02-25 2020-03-04 2020-03-25 2020-04-01 2020-06-30 via KPOs network "Performing operations Selection related to the delivery and reception of postal items" FSDP/IC/2.3.19 / Expert trainer on conducting, organizing and providing training on the topic: "IT Individual technologies to promote Enhancing financial services IDA / 50670 Post Consultant Open 6,330.00 0.00 Canceled 2020-01-14 2020-02-21 2020-03-03 2020-03-24 2020-04-01 2020-06-30 financial services. Basics of via KPOs network Selection computer literacy/skills in Word and Excel, Internet, using applications via smartphones" FSDP/IC/FM-2.3.10/1 / Enhancing financial services Consultant on financial IDA / H7600 Post Direct Selection Direct 4,550.00 4,527.86 Completed 2020-03-23 2020-03-18 2020-03-28 2020-03-23 2020-04-01 2020-03-26 2020-06-30 2020-06-26 via KPOs network management FSDP/SSS/2.3.7 / Rebranding Enhancing financial services Under of the KPO's existing IDA / H7600 Post Direct Selection Direct 920.00 0.00 2021-02-15 2021-02-11 2021-02-25 2021-02-12 2021-04-01 2021-04-16 via KPOs network Implementation brandbook IDA/FSDP/CS/SSS/2021/1 / Finalization of capacity Enhancing financial services IDA / H7600 Post Direct Selection Direct 175,015.00 175,015.00 Signed 2021-03-19 2021-03-19 2021-03-29 2021-03-25 2021-04-09 2021-03-31 2021-06-30 building in Financial via KPOs network Management for KPO Page 3 PLAN DE PASSATION DES MARCHÉS Information sur le Projet : République d’Haiti Nom du Projet : Relance de l’Agriculture : Renforcement des Services Publics Agricoles – Phase II (RESEPAG II) No d’identification (du projet : P126744 Agence d’exécution du Projet : Ministère de l’Agriculture, des Ressources Naturelles et du Développement Rural (MARNDR) Date du plan de passation des marchés : 17 Décembre 2018 Période couverte par ce plan de passation des marchés : 2018 et 2019 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : a) Les entreprises éligibles de tout pays peuvent concourir ; b) Le dossier d’appel d’offres/a propositions oblige le Soumissionnaire/Proposant présentant une Offre/Proposition à déposer un agreement signe, qui sera joint à tout contrat éventuel, pour confirmer qu’il applique et respecte les Directives de la Banque pour la lutte contre la corruption, y compris sans limitation, le droit de la Banque de sanctionner et les droits de la Banque pour l’inspection et l’audit ; c) Les marchés doivent comporter une répartition appropriée des attributions, risques et responsabilités ; d) La publication des informations relatives à l’attribution du marché ; e) Le droit de la Banque d’examiner le dossier et les activités de passation des marchés ; f) L’existence d’un mécanisme efficace d’examen des plaintes ; et g) La gestion et l’archivage des dossiers relatifs au Processus de passation des marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés : « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas Travaux ne s’applique pas Autres informations pertinentes sur la passation des marchés : « Sans Objet » Les seuils pour les méthodes de passation des marchés : Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : Contrats sujets à Méthode de Seuils la Revue Préalable Catégorie Passation (Montant en Million (Montant en Million de Dépenses des Marchés USD) USD AOI ≥ 3.0 Tous les contrats Travaux AON ≥ 1.0 < 3.0 Aucun DC < 1.0 Aucun AOI ≥ 0.5 Tous les contrats Biens et Services AON < 0.5 Aucun Autres que des DC < 0.2 Aucun Services de Quelle que soit la Consultants SD Tous les contrats ≥ 0.5 valeur SFQC, SFQ, Quelle que soit la Services de Tous les contrats ≥ 0.5 SCBD, SMC valeur Consultants QC < 0.3 Aucun (Cabinet/Bureau d’Études) Quelle que soit la SD Tous les contrats ≥ 0.5 valeur Consultants Tous les contrats ≥ 0.2 Comparaison de Quelle que soit la Individuels et Certaines missions (Conformément les 3 CV. valeur clés paragraphes 7.34 à Contrats sujets à Méthode de Seuils la Revue Préalable Catégorie Passation (Montant en Million (Montant en Million de Dépenses des Marchés USD) USD 7.39 de la Section VII du Règlement de Quelle que soit la Passation des Marchés SD Tous les contrats ≥ 0.2 valeur de la Banque) Abréviations : SFQC = Sélection Fondée sur la Qualité et le Coût Abréviations : SFQ = Sélection Fondée sur la Qualité AOI = Appel d’offres international SCBD = Sélection dans le Cadre d’un Budget AON = Appel d’offres national Déterminé DC = Demande de Cotation SMC = Sélection au « Moindre Coût » SD = Sélection Directe QC = Sélection Fondée sur les Qualifications du Consultant SD = Sélection Directe N.B. : Les contrats passés par Sélection Directe n’ont pas de seuils spécifiques (méthodes & seuils de revue préalable), en ce qui concerne la revue préalable de la Banque, il leur est appliqué les seuils indiqués dans le tableau ci-dessus. PROCUREMENT Haiti : Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA) PLAN General Information Country: Haiti Bank’s Approval Date of the Original Procurement Plan: 2018-12-18 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P126744 GPN Date: Project Name: Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA) Loan / Credit No: IDA / D2100, TF / 11396, IDA / H7410 MINISTERE DE L AGRICULTURE DES RESSOURCES NATURELLES ET DU DEVELOPPEMENT RURAL Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned HT-AF-RESEPAG II-68667- CW-RFB / Travaux de Component 2: Providing réhabilitations et support for local agricultural Single Stage - One 2,395,457.2 2020-03- d'aménagement et de IDA / D2100 extension and innovation Prior Request for Bids Open - International 4,675,000.00 Signed 2019-01-28 2019-06-28 2019-02-02 2019-07-09 2019-03-16 2019-09-03 2019-04-15 2020-02-05 2019-06-08 2020-05-06 Envelope 0 04 protection des infrastructures services (US$ 36 million agricoles et d'irrigations equivalent, IDA) (Grand Sud) RE2-AON-01/18 / Component 1: Strengthening Recrutement de firmes pour the role of MARNDR in Single Stage - One 2019-10- les travaux de construction du TF / 11396 providing agricultural Prior Request for Bids Open - National 1,175,063.00 965,130.24 Signed 2018-06-28 2019-04-26 2018-06-28 2018-08-20 2018-08-20 2018-10-02 2019-05-17 2019-01-21 2018-12-19 Envelope 18 Batiment administratif central support services(US$10 de l'UPS million) Component 2: Providing RE2-FA-T-AOI-01/19 / support for local agricultural Single Stage - One 2,322,778.0 2021-01- Rénovation du seuil de IDA / D2100 extension and innovation Prior Request for Bids Open - International 4,200,000.00 Signed 2019-08-05 2019-07-25 2019-08-10 2019-07-29 2019-09-30 2019-09-24 2019-10-30 2020-01-28 2019-12-04 2020-06-02 Envelope 0 27 Dubreuil sur la rivière Lacul services (US$ 36 million equivalent, IDA) RE2-SED-35/21 / Finalisation Component 2: Providing des travaux de construction support for local agricultural Under Other (with field 2022-01- du bâtiment central IDA / D2100 extension and innovation Post Direct Selection Direct 700,000.00 0.00 Implementat 2021-05-24 2021-06-09 2021-05-31 2021-07-09 for explanation) 05 Administratif de l’UPS à services (US$ 36 million ion Tamarinier equivalent, IDA) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Strengthening RE2-CF-37/19 / Acquisition the role of MARNDR in Request for Single Stage - One des kits pour la réalisation TF / 11396 Post Limited 35,000.00 0.00 Canceled 2019-04-15 2019-05-09 2019-06-26 2019-09-24 providing agricultural Quotations Envelope des activités d'inspection support services(US$10 million) Component 1: Strengthening RE2-CF-39/18 / Acquisition the role of MARNDR in Request for Single Stage - One de 6000 boucles d'oreille pour TF / 11396 Post Limited 154,000.00 94,035.51 Terminated 2019-01-04 2019-01-22 2019-03-17 2019-10-22 2019-09-13 providing agricultural Quotations Envelope identification bétails support services(US$10 million) RE2-FA-AON-01/17 / Acquisition de matériels Component 2: Providing végétaux (plantules/ support for local agricultural drageons/semence/cayeux) Single Stage - One IDA / D2100 extension and innovation Prior Request for Bids Open - National 5,109,250.00 0.00 Canceled 2018-09-03 2019-01-23 2018-09-03 2018-10-15 2018-10-15 2018-11-14 2019-04-02 2019-01-30 2019-10-27 dans le cadre de l’octroi de Envelope services (US$ 36 million nouvelles incitations agricoles equivalent, IDA) dans certaines communes du département du Sud RE2-FA-AON-01A/17 / Matériels végétaux (plantules/ Component 2: Providing drageons/semence/cayeux) support for local agricultural Single Stage - One dans le cadre de l’octroi de IDA / D2100 extension and innovation Prior Request for Bids Open - National 5,109,250.00 3,598,375.01 Signed 2018-09-03 2019-05-31 2018-09-03 2018-10-15 2018-10-15 2018-11-14 2019-06-01 2019-01-30 2019-01-22 2019-10-27 Envelope nouvelles incitations agricoles services (US$ 36 million dans certaines communes du equivalent, IDA) département du Sud Component 1: Strengthening RE2-CF-35/19 / Acquisition the role of MARNDR in Request for Single Stage - One d'équipements (multiple) pour TF / 11396 Post Limited 156,077.00 0.00 Canceled 2019-03-02 2019-05-13 2019-08-11 providing agricultural Quotations Envelope le fonctionnement de l'EMAVA support services(US$10 million) Component 1: Strengthening RE2-CF-36/19 / Acquisition the role of MARNDR in Request for Single Stage - One d'équipements bureau TF / 11396 Post Limited 150,000.00 0.00 Canceled 2019-07-20 2019-09-30 2019-12-29 providing agricultural Quotations Envelope administratif UPS support services(US$10 million) RE2-FA-SED-38/18 / Accquisition du logiciel Component 4: Project ACPACC pour le compte du Administration and projet RESEPAG, paramétrage IDA / D2100 Post Direct Selection Direct 70,000.00 0.00 Canceled 2019-01-07 2019-01-11 2019-01-12 2019-01-15 2019-03-11 2019-12-31 Coordination (US$ 3 million du logiciel, migration des equivalent,IDA) données à partir du syscop, et formation du personnel cible Component 1: Strengthening RE2-CF-40/19 / Acquisition the role of MARNDR in Request for Single Stage - One TF / 11396 Post Limited 50,000.00 0.00 Canceled 2019-01-29 2019-05-07 2019-04-11 2019-07-10 de motocyclettes pour la DSA providing agricultural Quotations Envelope support services(US$10 million) Component 2: Providing RE2-CF-41/21 / Accessoires support for local agricultural pour compléter le kit apicole Request for Single Stage - One IDA / D2100 extension and innovation Post Limited 144,000.00 183,503.63 Signed 2021-02-24 2021-03-23 2021-04-21 2021-06-09 2021-07-20 pour les 280 familles Quotations Envelope services (US$ 36 million bénéficiaires de ce paquet equivalent, IDA) Component 4: Project RE2-CF-42/21 / Matériels Under Administration and Request for Single Stage - One informatiques pour RESEPAG IDA / D2100 Post Limited 18,000.00 0.00 Implementati 2021-02-24 2021-04-15 2021-07-14 Coordination (US$ 3 million Quotations Envelope et UPMP-MARNDR on equivalent,IDA) Page 1 Component 2: Providing RE2-CF-43/21 / support for local agricultural Pending Request for Single Stage - One Equipements de bureau pour IDA / H7410 extension and innovation Post Limited 100,000.00 0.00 Implementati 2021-06-07 2021-08-02 2021-11-30 Quotations Envelope le bâtiment central de l'UPS services (US$ 36 million on equivalent, IDA) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RE2-FA-SED-40/21 / Prise en charge de l’installation des Component 4: Project équipements Under Administration and hydrométéorologiques IDA / D2100 Post Direct Selection Direct 238,000.00 0.00 Implementati 2021-05-07 2021-05-30 2021-05-12 2021-07-05 2021-12-02 Coordination (US$ 3 million achetés par le projet on equivalent,IDA) HYDROMET sur le budget du RESEPAG II CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RE2-FA-DP-05/18 / Component 2: Providing Recrutement d'un consultant support for local agricultural pour l'etablissement du Quality And Cost- IDA / D2100 extension and innovation Prior Open - International 1,300,000.00 1,081,855.52 Signed 2017-12-22 2019-02-10 2017-12-22 2019-02-10 2018-04-09 2019-05-16 2018-05-30 2018-05-30 2018-08-02 2019-05-17 2018-10-02 2019-06-06 2019-01-15 2019-03-13 2019-07-14 registe des agriculteurs et Based Selection services (US$ 36 million fournisseurs dans le Sud, equivalent, IDA) Nippes et Grand-Anse RE2-FA-DP-02/18 / Recrutement Opérateur Component 2: Providing Gestion des programmes a support for local agricultural participation communautaire Quality And Cost- IDA / D2100 extension and innovation Prior Open - International 5,500,000.00 5,665,323.37 Signed 2017-09-16 2019-02-10 2017-10-07 2017-11-20 2019-02-10 2017-12-18 2019-03-20 2018-01-17 2019-04-21 2018-02-21 2019-04-23 2018-11-27 2018-11-27 2019-12-31 - développement des Based Selection services (US$ 36 million infrastructures rurales et le equivalent, IDA) renforcement des ménages bénéficiaires dans le Sud RE2-QC-01/18 / Component 1: Strengthening Recrutement d'un consultant the role of MARNDR in Consultant pour la supervision de la TF / 11396 providing agricultural Post Qualification Open - International 180,000.00 60,605.92 Signed 2018-05-10 2018-05-10 2018-05-10 2018-07-06 2018-07-13 2018-12-20 2018-12-21 2019-01-21 2019-01-29 2019-11-17 construction du batiment support services(US$10 Selection administratif central de l'UPS million) HT-AF-RESEPAG II-68670-CS- QCBS / Recrutement d'un Component 2: Providing Consultant pour la support for local agricultural Quality And Cost- Supervision des travaux de IDA / D2100 extension and innovation Post Open - International 495,000.00 387,989.43 Signed 2019-01-21 2019-03-09 2019-02-11 2019-01-03 2019-03-12 2019-03-09 2019-04-09 2019-06-19 2019-04-24 2019-09-11 2019-05-11 2020-02-18 2019-06-15 2020-06-15 2019-12-31 Based Selection réhabilitation des services (US$ 36 million infrastructures agricoles et equivalent, IDA) d'irrigation (Grand Sud) RE2-FA-AMI-06/18 / Component 1: Strengthening Recrutement d'un Consultant the role of MARNDR in Consultant pour Etudes de Sauvegardes IDA / D2100 providing agricultural Post Qualification Open - International 250,000.00 0.00 Canceled 2018-10-19 2018-10-06 2018-11-09 2018-12-23 2019-02-22 2019-04-07 2019-10-04 environnementales support services(US$10 Selection (Pesticides) million) Component 2: Providing RE2-FA-DP-04/18 / support for local agricultural Quality Based Opérateur Incitation (Grand IDA / D2100 extension and innovation Prior Open - International 2,053,587.00 1,682,689.61 Signed 2017-12-21 2019-04-23 2017-12-28 2018-03-28 2019-05-10 2018-05-16 2018-05-16 2018-07-23 2019-05-13 2018-08-24 2019-05-16 2018-09-26 2018-09-26 2019-12-05 Selection Sud) services (US$ 36 million equivalent, IDA) RE2-DP-05/18 / Vidéos Component 1: Strengthening didactiques - Prestataire de the role of MARNDR in Quality Based Service pour revoir des fiches TF / 11396 providing agricultural Prior Open - International 350,964.00 311,552.18 Signed 2017-08-25 2019-04-23 2018-01-25 2018-06-04 2019-05-17 2018-07-17 2018-07-17 2018-08-03 2019-05-17 2018-09-12 2019-05-17 2018-10-26 2018-10-26 2019-06-21 Selection et procéder à la production de support services(US$10 matériels didactiques million) RE2-FA-DP-01/17 / Etudes détaillées des ouvrages Component 2: Providing d'irrigation à réhabiliter pour support for local agricultural Quality And Cost- les périmètres de : Dory, IDA / D2100 extension and innovation Prior Open - International 268,202.00 248,085.32 Signed 2017-09-09 2019-04-23 2017-09-27 2017-12-27 2019-05-12 2018-02-15 2018-02-15 2018-03-26 2019-05-13 2018-05-02 2019-05-13 2018-07-02 2018-07-02 2019-02-10 Based Selection Dubreuil, Les Anglais et services (US$ 36 million Melon, dans le département equivalent, IDA) du Sud Component 2: Providing RE2-FA-DP-03/18 / support for local agricultural Quality And Cost- Recapitalisation des Éleveurs IDA / D2100 extension and innovation Prior Open - International 3,383,069.00 3,234,114.96 Signed 2017-12-22 2019-04-23 2018-01-18 2018-03-28 2019-05-17 2018-05-14 2018-05-14 2018-05-24 2019-05-17 2018-06-25 2019-05-17 2018-08-22 2018-08-22 2019-12-27 Based Selection Victimes de l'ouragan Matthew services (US$ 36 million equivalent, IDA) RE2-QC-02/20 / Prestataire de Services pour fournir au Component 4: Project Consultant MARNDR le logiciel ACCPAC, Administration and IDA / D2100 Post Qualification Open - National 70,000.00 82,542.36 Signed 2020-08-07 2020-08-18 2020-08-14 2020-09-18 2021-02-22 2020-10-02 2021-04-15 2020-11-06 2021-06-08 2021-09-02 le formater et, former et Coordination (US$ 3 million Selection accompagner le personnel equivalent,IDA) fiduciaire à son utilisation Component 4: Project RE2-FA-SMC-01/20 / Audit Administration and Least Cost financier du projet RESEPAG IDA / D2100 Post Open - National 70,000.00 40,735.00 Signed 2020-08-20 2020-08-18 2020-08-25 2020-08-28 2020-09-07 2020-10-09 2020-10-08 2020-10-23 2020-10-15 2020-11-09 2020-11-06 2020-12-14 2020-12-11 2022-08-31 Coordination (US$ 3 million Selection 2019-2022 equivalent,IDA) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 RE2-QCIN-34/18 / Component 2: Providing Recrutement d'un (e) support for local agricultural Individual consultant (e) pour IDA / H7410 extension and innovation Post Consultant Open 12,000.00 10,848.49 Signed 2019-01-15 2019-02-01 2019-03-05 2019-04-30 2019-03-12 2019-05-03 2019-04-25 2019-07-19 2019-07-24 l'évaluation de l'intégration de services (US$ 36 million Selection l'aspect genre au projet equivalent, IDA) RESEPAG Component 2: Providing RE2-QCIN-33/18 / support for local agricultural Individual Recrutement d'un Ingénieur IDA / H7410 extension and innovation Post Consultant Limited 36,400.00 4,245.76 Signed 2019-01-15 2019-01-15 2019-02-14 2019-05-08 2019-02-19 2019-05-21 2019-04-04 2019-07-09 2019-12-31 Rural / Civil pour le Sud dans services (US$ 36 million Selection le cadre du FSV equivalent, IDA) RE2-QCIN-31/18 / Component 2: Providing Recrutement d'un Spécialiste support for local agricultural Individual en Passation des Marchés IDA / H7410 extension and innovation Post Consultant Limited 23,284.00 11,949.72 Signed 2018-11-06 2019-02-10 2018-11-30 2018-11-28 2018-12-05 2018-06-01 2019-01-09 2018-12-19 2019-12-31 pour accompagner les services (US$ 36 million Selection OPR_Sud / FSV equivalent, IDA) Component 1: Strengthening RE2-SED-21/18 / Campagne the role of MARNDR in TF / 11396 Prior Direct Selection Direct 1,002,376.00 1,436,461.09 Signed 2018-12-21 2019-01-14 2018-12-31 2019-01-21 2019-03-15 2019-09-09 2019-12-31 de vaccination contre la rage providing agricultural support services(US$10 million) RE2-SED-22/19 / Recrutement d'un Consultant pour assurer l'évaluation et le suivi des travaux correctifs à Component 1: Strengthening l'Ecole Moyenne d'Agriculture the role of MARNDR in de la Vallée de l'Artibonite TF / 11396 providing agricultural Post Direct Selection Direct 7,000.00 14,616.17 Signed 2019-01-25 2019-03-09 2019-02-04 2019-03-15 2019-03-21 2019-04-15 2019-12-31 (EMAVA) et le suivi technique support services(US$10 des million) travaux de construction du Bâtiment central de l'UPS à Tamarinier. RE2-SED-23/19 / Component 2: Providing Recrutement d'un (e) Assistant support for local agricultural Individual (e) technique en appui au IDA / H7410 extension and innovation Post Consultant Direct 8,767.00 8,466.81 Signed 2019-03-04 2019-03-15 2019-03-11 2019-03-15 2019-03-14 2019-03-18 2019-04-03 2019-03-26 2019-09-30 programme d'incitations services (US$ 36 million Selection agricoles et Champ Ecole equivalent, IDA) Paysan dans le Sud RE2-SED-24/19 / Recrutement d'un Consultant Component 2: Providing pour donner un appui support for local agricultural Individual technique dans le cadre des IDA / D2100 extension and innovation Post Consultant Direct 30,000.00 21,290.05 Signed 2019-03-15 2019-04-12 2019-03-20 2019-07-03 2019-03-25 2019-07-04 2019-04-19 2019-07-30 2020-02-13 travaux de Réhabilitation des services (US$ 36 million Selection Infrastructures d'Irrigation equivalent, IDA) dans le Sud Component 1: Strengthening RE2-PA-04/18 / Enquête the role of MARNDR in suivi liée à l'évaluation TF / 11396 Prior Direct Selection Direct 120,000.00 86,379.70 Signed 2017-09-14 2019-06-01 2017-09-26 2017-11-21 2018-09-12 2018-09-12 2018-12-11 providing agricultural d'impact du FSV du RESEPAG II support services(US$10 million) Component 2: Providing RE2-SED-25/19 / Extension support for local agricultural des actions liées aux IDA / H7410 extension and innovation Prior Direct Selection Direct 383,370.00 347,779.98 Signed 2019-05-03 2019-05-16 2019-05-17 2019-05-17 2019-06-24 2019-07-22 2019-12-21 incitations agricoles dans le services (US$ 36 million Département du Centre d'Haiti equivalent, IDA) RE2-SED-26/19 / Ingénieur assurant le suivi des travaux Component 2: Providing et des activités afin d'appuyer support for local agricultural Individual la maitrise d'ouvrage IDA / D2100 extension and innovation Post Consultant Direct 48,000.00 2,682.23 Signed 2019-06-24 2019-06-21 2019-06-27 2019-07-03 2019-07-02 2019-07-04 2019-07-29 2019-08-16 2019-11-26 représentée par la DDA Sud / services (US$ 36 million Selection la DIA et la coordination du equivalent, IDA) RESEPAG RE2-SED-27/19 / OPS- Component 2: Providing extension des actions liées au support for local agricultural Fonds de cofinancement des IDA / H7410 extension and innovation Prior Direct Selection Direct 700,000.00 557,481.79 Signed 2019-07-22 2019-08-26 2019-08-09 2019-05-17 2019-10-11 2020-02-19 2020-06-30 Services de Vulgarisation services (US$ 36 million agricole (FSV) dans le equivalent, IDA) Département du Sud RE2-SED-28/19 / Consultant Component 4: Project Individual d’appui à la gestion Administration and IDA / H7410 Post Consultant Direct 20,800.00 15,439.14 Signed 2019-10-16 2019-10-17 2019-10-24 2019-11-20 2019-10-25 2019-11-21 2019-11-29 2019-10-01 2020-09-30 administrative, financière et Coordination (US$ 3 million Selection comptable du RESEPAG equivalent,IDA) RE2-QCIN-35/19 / Chargé de la production du rapport Component 4: Project final d’exécution et de Individual Administration and résultats des activités IDA / H7410 Post Consultant Limited 15,000.00 11,857.06 Signed 2019-11-07 2019-11-08 2019-11-28 2019-12-04 2019-12-03 2020-01-07 2019-12-27 2020-02-11 2020-02-05 Coordination (US$ 3 million financées par le GAFSP et de Selection equivalent,IDA) celles des sous composantes sous financement IDA Component 2: Providing RE2-FA-SED-39/19 / support for local agricultural OPS_extension des actions IDA / D2100 extension and innovation Prior Direct Selection Direct 800,000.00 525,673.63 Signed 2019-11-15 2019-11-20 2019-11-27 2020-01-08 2020-01-09 2020-02-14 2020-10-05 liées aux incitations agricoles services (US$ 36 million dans le Département du Sud equivalent, IDA) Component 2: Providing RE2-FA-QCIN-35/18 / support for local agricultural Individual Recrutement du Responsable IDA / D2100 extension and innovation Post Consultant Limited 67,230.00 0.00 Canceled 2019-01-24 2019-02-08 2019-02-13 2019-03-29 2019-12-31 d'irrigation services (US$ 36 million Selection equivalent, IDA) Component 2: Providing RE2-QCIN-32/18 / support for local agricultural Individual Recrutement d'un Spécialiste IDA / H7410 extension and innovation Post Consultant Open 34,223.00 0.00 Canceled 2018-01-15 2019-02-10 2018-12-20 2018-12-26 2019-01-30 2019-12-31 en Socio-environnemental services (US$ 36 million Selection equivalent, IDA) Component 4: Project Individual RE2-FA-QCIN-10/18 / Audit Administration and IDA / D2100 Post Consultant Open 20,000.00 0.00 Canceled 2018-12-05 2019-02-10 2019-01-23 2019-02-02 2019-03-18 2019-05-17 technique du projet RESEPAG Coordination (US$ 3 million Selection equivalent,IDA) Page 3 RE2-QCIN-25/18 / Recrutement de deux (2) Component 2: Providing Assistant-e-s techniques en support for local agricultural Individual appui à la commercialisation IDA / H7410 extension and innovation Post Consultant Open 85,500.00 0.00 Canceled 2018-12-05 2018-12-05 2019-01-22 2019-01-27 2019-03-12 2019-12-31 des produits agricoles dans le services (US$ 36 million Selection cadre du FSV pour le Sud et le equivalent, IDA) Nord Component 2: Providing RE2-FA-QCIN-08/18-1 / support for local agricultural Individual Under Consultant en gestion de IDA / D2100 extension and innovation Post Consultant Open 42,500.00 0.00 2020-08-07 2020-08-18 2020-09-09 2020-09-16 2020-10-10 2021-09-30 Implementation plaintes et en communication services (US$ 36 million Selection equivalent, IDA) RE2-QCIN-25/18-1 / Component 2: Providing Assistant (e) technique en support for local agricultural Individual Under appui à la commercialisation IDA / D2100 extension and innovation Post Consultant Limited 42,500.00 0.00 2020-08-11 2020-08-18 2020-08-25 2020-09-01 2020-10-02 2021-09-30 Implementation des produits agricoles dans le services (US$ 36 million Selection cadre du FSV pour le Sud equivalent, IDA) Component 2: Providing RE2-QCIN-30/18-1 / support for local agricultural Individual Assistant technique dans le IDA / D2100 extension and innovation Post Consultant Direct 19,500.00 32,674.66 Signed 2020-08-11 2020-09-08 2020-08-25 2020-10-19 2020-09-01 2020-10-21 2020-09-25 2020-11-05 2021-09-30 cadre du FSV pour le Sud services (US$ 36 million Selection equivalent, IDA) RE2-FA-QCIN-08/18 / Component 2: Providing Recrutement d'un spécialiste support for local agricultural Individual en gestions des plaintes et en IDA / D2100 extension and innovation Post Consultant Open 42,019.00 0.00 Canceled 2019-01-15 2018-12-03 2019-03-05 2019-03-15 2019-04-28 2019-12-31 communication pour la services (US$ 36 million Selection Coordination Régionale Sud equivalent, IDA) Component 2: Providing RE2-QCIN-30/18 / support for local agricultural Individual Recrutement d'un Assistant IDA / H7410 extension and innovation Post Consultant Open 85,500.00 0.00 Canceled 2018-12-05 2018-12-05 2019-01-22 2019-01-27 2019-03-03 2019-12-31 technique dans le cadre du services (US$ 36 million Selection FSV pour le Sud equivalent, IDA) RE2-SED-29/20 / Consultant Component 2: Providing pour donner un appui support for local agricultural Individual technique dans le cadre des IDA / D2100 extension and innovation Post Consultant Direct 63,875.00 41,061.15 Signed 2020-08-25 2020-08-20 2020-09-04 2020-10-19 2020-09-11 2020-10-21 2020-10-06 2020-11-05 2021-12-30 travaux de Réhabilitation des services (US$ 36 million Selection Infrastructures d'Irrigation equivalent, IDA) dans le Sud Component 2: Providing RE2-QCIN-36/20 / support for local agricultural Individual Assistants techniques en IDA / H7410 extension and innovation Post Consultant Limited 56,814.00 49,921.70 Signed 2020-09-30 2020-09-21 2020-10-13 2020-12-10 2020-11-03 2020-12-14 2020-12-08 2021-01-11 2020-12-16 appui au FSV - Sélection de services (US$ 36 million Selection deux assistants techniques equivalent, IDA) Component 2: Providing support for local agricultural Individual RE2-QCIN-37/20 / Ingénieur IDA / H7410 extension and innovation Post Consultant Limited 29,830.00 27,920.26 Signed 2020-09-30 2020-09-21 2020-10-09 2020-12-15 2020-10-30 2020-12-18 2020-12-04 2021-01-13 2020-12-16 civil en appui au FSV services (US$ 36 million Selection equivalent, IDA) Component 2: Providing RE2-QCIN-38/20 / support for local agricultural Individual Under Comptable OPR Sud en appui IDA / H7410 extension and innovation Post Consultant Limited 15,624.00 0.00 2020-09-30 2020-09-22 2020-10-15 2020-11-05 2020-12-10 2020-12-16 Implementation au FSV services (US$ 36 million Selection equivalent, IDA) Component 4: Project RE2-SED-30/20 / Specialiste Individual Administration and en passation des marchés en IDA / H7410 Post Consultant Direct 29,828.00 33,588.65 Signed 2020-09-21 2020-09-07 2020-10-01 2020-09-21 2020-10-03 2020-09-24 2020-10-10 2020-10-14 2020-10-16 Coordination (US$ 3 million appui a UPMP Selection equivalent,IDA) RE2-QCIN-37/21 / Component 4: Project Individual Consultant d’appui ponctuel à Administration and Under IDA / D2100 Post Consultant Limited 10,000.00 0.00 2021-05-17 2021-05-27 2021-05-24 2021-06-14 2021-07-19 2021-09-07 la gestion financière et Coordination (US$ 3 million Implementation Selection comptable equivalent,IDA) RE2-QCIN-38/21 / Component 4: Project Individual Consultant pour conduire Administration and Under IDA / D2100 Post Consultant Limited 15,000.00 0.00 2021-05-17 2021-05-27 2021-05-27 2021-06-24 2021-07-29 2021-12-30 l’analyse économique et Coordination (US$ 3 million Implementation Selection financière du projet equivalent,IDA) Component 4: Project RE2-SED-31/21 / Consultant Individual Administration and Under pour la réalisation de l’étude IDA / D2100 Post Consultant Direct 40,000.00 0.00 2021-05-19 2021-05-27 2021-05-28 2021-06-11 2021-07-07 2022-01-03 Coordination (US$ 3 million Implementation d’impact du RESEPAG Selection equivalent,IDA) RE2-SED-32/21 / Component 4: Project Consultante en Genre pour Individual Administration and Under une analyse de la prise en IDA / D2100 Post Consultant Direct 10,500.00 0.00 2021-05-20 2021-05-27 2021-06-01 2021-06-22 2021-07-16 2021-08-30 Coordination (US$ 3 million Implementation compte de l’aspect genre Selection equivalent,IDA) dans le projet RESEPAG 2 RE2-SED-33/21 / Consultant Component 4: Project international pour la Individual Administration and préparation du rapport IDA / D2100 Post Consultant Direct 15,000.00 0.00 Under Review 2021-05-21 2021-05-27 2021-06-02 2021-06-23 2021-07-28 2022-01-24 Coordination (US$ 3 million d’achèvement du projet Selection equivalent,IDA) RESEPAG 2 RE2-SED-34/21 / Component 2: Providing Supervision, suivi technique et support for local agricultural Individual financier des travaux Under IDA / H7410 extension and innovation Post Consultant Direct 40,000.00 0.00 2021-05-21 2021-05-31 2021-05-31 2021-06-21 2021-07-19 2022-01-15 d’achèvement de la Implementation services (US$ 36 million Selection construction du Bâtiment equivalent, IDA) central de l’UPS à Tamarinier Page 4 18 MONTHS PROCUREMENT PLAN (Textual Part) Project information: Vietnam Forest Sector Modernization and Coastal Resilience Enhancement Project (P157127) Project Implementation agency: MARD, Provinces of Quang Ninh; Hai Phong; Thanh Hoa; NgheAn; Ha Tinh; Quang Binh; Quang Tri; Thua Thien Hue Date of the Procurement Plan: [Date to beinserted] Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. A. The Bank’s Standard Procurement Documents (SPDs): The Bank’s SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 1. Open Competitive Procurement: When the Recipient uses its own national open competitive procurement arrangements as set forth in (a) Article 20 on Open Bidding of the Recipient’s Law on Procurement No. 43/2013/QH13 dated November 26, 2013 and related provisions necessary to effect the same; and (b) the Recipient’s Decree No. 63/2014/ND-CP dated June 26, 2014 Guiding Implementation of the Law on the Procurement (collectively, “National Procurement Laws”), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (i) No domestic preference over foreign bidders shall be granted to national bidders in bid evaluation, nor shall foreign bidders be asked or required to form joint ventures with or be subcontractors to national bidders in order to submit a bid. (ii) The model bidding documents (harmonized model bidding documents) agreed with the Association shall be used. (iii) No bid shall be eliminated from detailed evaluation on the basis of minor, non-substantive deviations. The evaluation of bidder’s qualifications shall be conducted separately subsequent to the technical and commercial evaluation of the bid. (iv) A bidder shall neither be required nor permitted, as a condition for award, to undertake obligations not specified in the bidding documents or otherwise to modify the bid as originally submitted. (v) No bid shall be rejected on the basis of a comparison with the employer’s estimate and budget ceiling. (vi) The Recipient shall implement an effective mechanism allowing bidders to complaint and have their complaints handled in a timely manner. The complaints mechanism shall allow the submission of anonymous complaints. 2. National Procurement Arrangements Other Than National Open Competitive Procurement: Not applicable. C. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. D. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable. E. Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): Not Applicable. F. Hands-on Expanded Implementation Support (HEIS)as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. G. Other Relevant Procurement Information: Not Applicable. PROCUREMENT Vietnam : Forest Sector Modernization and Coastal Resilience Enhancement Project PLAN General Information Country: Vietnam Bank’s Approval Date of the Original Procurement Plan: 2019-10-01 2021-05-16 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157127 GPN Date: 2019-06-04 Project Name: Forest Sector Modernization and Coastal Resilience Enhancement Project Loan / Credit No: IDA / 60790 Q Executing Agency(ies): uang Ninh Provincial Project Management Unit for FMCRP WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FMCR-QN-HH01 / Production and supply of seedling and Coastal Forest Development IDA / 60790 Post Direct Selection Direct 530,000.00 277,657.60 Signed 2019-10-15 2019-10-01 2019-10-25 2020-06-29 2019-11-18 2020-07-10 2022-11-17 supplementary material for and Rehabilitation planting in Year 1 (2020) FMCR-QN-HH02 / Production, supply of Pending Coastal Forest Development seedlings and auxiliary IDA / 60790 Post Direct Selection Direct 750,000.00 0.00 Implementati 2021-06-10 2021-06-20 2021-07-14 2023-12-31 and Rehabilitation materials for forest plantation on 200ha - phase 1, 2021 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FMCR-QN-PTV01 / Measurement and development of community- Coastal Forest Development Single Stage - One IDA / 60790 Post Request for Bids Open - National 474,850.00 0.00 Canceled 2020-01-02 2020-02-01 2020-03-17 2020-04-06 2020-04-16 2020-12-12 based forest management and Rehabilitation Envelope profiles for existing forest areas for communities CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FMCR-QN-TV03 / Planning Consultant and implementation of social IDA / 60790 Project Management and M&E Post Qualification Open - National 288,000.00 283,499.69 Signed 2019-11-10 2020-06-29 2019-11-11 2019-12-11 2020-10-07 2020-01-20 2020-11-11 2020-02-09 2020-12-25 2023-12-02 and environmental safeguards Selection at provincial level FMCR-QN-TV01 / Site survey and design for forest new Consultant Coastal Forest Development plantation and restoration in IDA / 60790 Post Qualification Open - National 214,000.00 147,468.20 Signed 2019-10-15 2020-07-07 2019-10-29 2019-11-28 2021-04-19 2020-01-07 2021-04-25 2020-02-01 2021-04-29 2022-01-31 and Rehabilitation project communes in 2020 Selection and 2021 FMCR-QN-TV02 / Survey and Consultant design for protection Coastal Forest Development Pending IDA / 60790 Post Qualification Open - National 38,000.00 0.00 2020-04-06 2020-04-20 2020-05-20 2020-05-20 2020-06-14 2021-06-14 measures for coastal forest in and Rehabilitation Implementation Selection project communes FMCR-QN-TV09 / Forest Consultant Coastal Forest Development Pending protection survey and design IDA / 60790 Post Qualification Open - National 70,000.00 0.00 2021-06-20 2021-07-05 2021-08-04 2021-08-09 2021-08-14 2021-12-12 and Rehabilitation Implementation under component 2.2 Selection FMCR-QN-TV08 / Measurement and Consultant development of community- Coastal Forest Development Pending IDA / 60790 Post Qualification Open - National 287,500.00 0.00 2021-06-14 2021-06-29 2021-07-19 2021-08-18 2021-08-28 2022-04-25 based forest management and Rehabilitation Implementation Selection profiles for existing forest areas for communities FMCR-QN-TV07 / Consulting service of surveying and design for pilot 01 Consultant Coastal Forest Development Pending infrastructure investment IDA / 60790 Post Qualification Open - National 21,487.00 0.00 2021-06-07 2021-06-22 2021-07-02 2021-08-01 2021-08-16 2021-11-14 and Rehabilitation Implementation package (pilot implemented in Selection 2021) under Subcomponent 3.2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FMCR-QN-TV04 / Design for pilot forest new plantation Coastal Forest Development Under IDA / 60790 Post Direct Selection Direct 16,500.00 0.00 2019-10-10 2019-12-23 2019-10-25 2020-02-15 2019-11-09 2020-01-08 and restoration (150ha) in and Rehabilitation Implementation 2020 Page 1 Procurement Plan for Punjab RWSS (P150520) I. General 1. Bank’s approval Date of the procurement Plan 2012 2. Date of General Procurement Notice: [October 01, 2014 ] 3. Period covered by this procurement plan: January 2020 onwards II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as per the Procurement Risk Rating of the Project: 2. Procurement Method Prior Review Threshold US$ 1. ICB and LIB (Goods) Above US$ 2M 2. NCB (Goods) Above US$ 1M 3. ICB (Works) Above US$ 40 million 4. NCB (Works) Above US$ 10 million 5. (Non-Consultant Services) Above US$ 1M 2. Prequalification for Bidders _Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P150520 5. Any Other Special Procurement Arrangements: In addition, the justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold 1. Competitive Methods (Firms) Above US$ 1M 2. Single Source (Firms) Above US$ 500,000 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT India : Punjab Rural Water and Sanitation Sector Improvement Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2018-09-24 2021-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150520 GPN Date: Project Name: Punjab Rural Water and Sanitation Sector Improvement Project Loan / Credit No: IBRD / 84870 Division Fatehgarh Sahib Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DWSS-W-DIV34-4743-1 / WSS Village Ladpur (T), Block Amloh, District Fatehgarh Sahib : Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 14,620.00 13,466.18 Signed 2018-09-20 2018-09-20 2016-08-30 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A DWSS-W-DIV34-4771-1 / WSS village Bugga Kalan Block Amloh District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 14,500.00 13,432.43 Signed 2018-09-20 2018-09-20 2016-09-19 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A. DWSS-W-DIV34-4770-1 / WSS Village Haibatpur Block Amloh District Fatehgarh Sahib :Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 14,150.00 13,192.72 Signed 2018-09-20 2018-09-20 2016-09-26 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A DWSS-W-DIV34-4809-1 / WSS village Lallon Khurd Block Amloh District Fatehgarh Sahib :Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 12,022.00 11,009.87 Signed 2018-09-20 2018-09-20 2016-09-30 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A PRWSS-W-DIV34-4768-1 / WSS Village Shahpur Block Amloh District Fatehgarh Sahib :Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 13,100.00 11,494.94 Signed 2018-09-20 2018-09-20 2016-10-26 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A. PRWSS-W-DIV34-5019-1 / WSS village Mugal Majra Block Amloh District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 11,700.00 10,826.48 Signed 2018-09-20 2018-09-20 2016-11-07 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A. DWSS-W-DIV34-4769-1 / WSS village Bhatton Block Amloh District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 14,400.00 12,794.33 Signed 2018-09-20 2018-09-20 2016-11-17 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A. DWSS-W-DIV34-5017-1 / WSS village Jalbera Block Amloh District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 13,760.00 12,874.58 Signed 2018-09-20 2018-09-20 2016-11-07 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A. DWSS-W-DIV34-4767-1 / WSS village Salana Dula Singh Wala Block Amloh District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- Improved Access to water IBRD / 84870 Post Open - National 11,420.00 10,514.64 Signed 2018-09-20 2018-09-20 2016-12-21 and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2A. PRWSS-W-DIV34-4747-1 / WSS village Kalondi Block Amloh District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 4,400.00 4,053.73 Signed 2018-09-20 2018-09-20 2016-09-01 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A. DWSS-W-DIV34-4777-1 / WSS village Rurki Block Amloh District Fatehgarh Sahib: Inclusive Household Water Request for Single Stage - One 2018-09- Providing Improved Access to IBRD / 84870 Post Open - National 7,600.00 19,534.70 Signed 2018-09-20 2018-09-20 2016-09-19 and Sanitation Services Quotations Envelope 20 water through Household connections in existing schemes under component 2B Page 1 DWSS-W-DIV34-4670-1 / WSS village Jallowal Block Amloh District Fatehgarh Sahib :Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 10,000.00 9,061.83 Signed 2018-09-20 2018-09-20 2016-09-06 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2B. DWSS-W-DIV34-4772-1 / WSS village Nanowal Block Bassi Pathana District Fatehgarh Sahib :Providing Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 3,900.00 3,610.21 Signed 2018-09-20 2018-09-20 2016-10-01 Improved Access to water and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2A DWSS-W-DIV34-4814-1 / WSS village Ghumandgarh Block Bassi Pathana District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- Improved Access to water IBRD / 84870 Post Open - National 14,000.00 13,038.92 Signed 2018-09-20 2018-09-20 2016-10-01 and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2A. DWSS-W-DIV34-4815-1 / WSS village Mandlan Block Bassi Pathana District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- Improved Access to water IBRD / 84870 Post Open - National 10,500.00 9,836.71 Signed 2018-09-20 2018-09-20 2016-11-30 and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2A. PRWSS-W-DIV34-4774-1 / WSS village Jai Singh Wala (Kheri Bhai Ki) Block Bassi Pathana District Fatehgarh Inclusive Household Water Request for Single Stage - One 2018-09- Sahib: Providing Improved IBRD / 84870 Post Open - National 5,400.00 4,975.50 Signed 2018-09-20 2018-09-20 2016-11-30 and Sanitation Services Quotations Envelope 20 Access to water through Household connections in existing schemes under component 2A. DWSS-W-DIV34-4773-1 / WSS village Mullanpur Block Bassi Pathana District Fatehgarh Sahib :Providing Inclusive Household Water Request for Single Stage - One 2018-09- Improved Access to water IBRD / 84870 Post Open - National 4,052.00 3,764.27 Signed 2018-09-20 2018-09-20 2016-11-30 and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2A. DWSS-W-DIV34-4776-1 / WSS village Kheri Bir Saingh Block Bassi Pathana District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 3,600.00 3,287.89 Signed 2018-09-20 2018-09-20 2016-11-30 Improved Access to water and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2B. DWSS-W-DIV34-4775-1 / WSS village Mullanpur Sadak Block Bassi Pathana District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 3,300.00 3,006.33 Signed 2018-09-20 2018-09-20 2016-11-30 Improved Access to water and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2B. DWSS-W-DIV34-4673-1 / WSS village Nar Singh Pura Block Bassi Pathan District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 7,000.00 6,414.96 Signed 2018-09-20 2018-09-20 2016-09-01 Improved Access to water and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2A DWSS-W-DIV34-3179-1/RRS / WSS village Dera Mir Meera block Bassi Pathana district Fatehgarh Sahib:Inst. of tubewell , RCC OHSR 25000 Transformation - Improved Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 70,500.00 62,136.49 Signed 2018-09-20 2018-09-20 2015-12-15 liter, Pumping machinery, Livability of Villages Quotations Envelope 20 chlorination plant, Pump Chamber cum Staff Quarter, distribution system and 4 month O & M. DWSS-W-DIV34-4746-1 / WSS village Barwali Kalan Block Khamano District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- Improved Access to water IBRD / 84870 Post Open - National 13,600.00 12,747.99 Signed 2018-09-20 2018-09-20 2016-07-26 and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2A DWSS-W-DIV34-4750-1 / WSS village Kalewal Block Khamano District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 7,200.00 6,590.58 Signed 2018-09-20 2018-09-20 2016-09-02 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A Page 2 DWSS-W-DIV34-4752-1 / WSS village Lohar Majra Block Khamano District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 4,400.00 4,041.79 Signed 2018-09-20 2018-09-20 2016-10-18 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A DWSS-W-DIV34-4748-1 / WSS village Badla Block Khamano District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 3,800.00 3,470.59 Signed 2018-09-20 2018-09-20 2016-09-09 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2B. DWSS-W-DIV34-4818-1 / WSS village Maneli Block Khamano District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 4,600.00 4,194.97 Signed 2018-09-20 2018-09-20 2016-10-28 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2B. DWSS-W-DIV34-4689-1 / WSS village Ambey Majra Block Sirhind District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 14,400.00 13,003.52 Signed 2018-09-20 2018-09-20 2016-09-09 Improved Access to water and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under componet 2A DWSS-W-DIV34-4811-1 / WSS village Wazirabad Block Sirhind District Fatehgarh Sahib : Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 4,500.00 4,183.01 Signed 2018-09-20 2018-09-20 2016-09-29 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A DWSS-W-DIV34-4813-1 / WSS village Kotla Jattan Block Sirhind District Fatehgarh Sahib : Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 4,200.00 3,874.67 Signed 2018-09-20 2018-09-20 2016-09-16 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A PRWSS-W-DIV34-4812-1 / WSS village Malko Majra Block Sirhind District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 9,400.00 8,744.15 Signed 2018-09-20 2018-09-20 2016-08-29 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A PRWSS-W-DIV34-5016-1 / WSS village Jakhwali Block Sirhind District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 13,000.00 12,058.60 Signed 2018-09-20 2018-09-20 2016-11-07 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A. DWSS-W-DIV34-5162-1 / WSS village Adampur Block Sirhind District Fatehgarh Sahib : Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 10,600.00 9,804.42 Signed 2018-09-20 2018-09-20 2016-12-20 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A DWSS-W-DIV34-4674-1 / WSS village Jhinjra Block Sirhind District Fatehgarh Sahib :Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 4,200.00 3,718.16 Signed 2018-09-20 2018-09-20 2016-09-09 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing scheme under component 2B. DWSS-W-DIV34-4751-1 / WSS village Alipur Sodian Block Sirhind District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 3,700.00 3,377.13 Signed 2018-09-20 2018-09-20 2016-08-31 Improved Access to water and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2B. DWSS-W-DIV34-4744-1 / WSS village Mianpur Block Sirhind District Fatehgarh Sahib :Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 3,900.00 3,564.33 Signed 2018-09-20 2018-09-20 2016-09-09 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2B. DWSS-W-DIV34-4817-1 / WSS village Bhamarsi Jer Basti Block Sirhind District Fatehgarh Sahib: Providing Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 3,300.00 3,010.47 Signed 2018-09-20 2018-09-20 2016-11-30 Improved Access to water and Sanitation Services Quotations Envelope 20 through Household connections in existing schemes under component 2B. Page 3 DWSS-W-DIV34-3186-1/RRS / WSS village Tehalpur Block Sirhind District Fatehgarh Sahib :Providing Improved Transformation - Improved Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 58,510.00 51,845.69 Signed 2018-09-20 2018-09-20 2015-12-15 Access to water through Livability of Villages Quotations Envelope 20 Household connections in existing schemes under component 1A DWSS-W-DIV34-5163-1 / WSS village Pirjain Block Khera District Fatehgarh Sahib Inclusive Household Water Request for Single Stage - One 2018-09- :Providing Improved Access to IBRD / 84870 Post Open - National 14,400.00 13,401.86 Signed 2018-09-20 2018-09-20 2016-12-20 and Sanitation Services Quotations Envelope 20 water through Household connections in existing schemes under component 2A PRWSS-W-DIV34-4749-1 / WSS village Manhera Jattan Block Khera District Fatehgarh Sahib :Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 2,700.00 2,442.39 Signed 2018-09-20 2018-09-20 2016-08-30 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2B DWSS-W-DIV34-4816-1 / WSS village Chunni Khurd Block Khera District Fatehgarh Sahib :Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 13,550.00 12,623.88 Signed 2018-09-20 2018-09-20 2016-09-23 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2B DWSS-W-DIV34-4766-1 / WSS village Balari Kalan Block Khera District Fatehgarh Sahib Inclusive Household Water Request for Single Stage - One 2018-09- :Providing Improved Access to IBRD / 84870 Post Open - National 10,020.00 9,254.37 Signed 2018-09-20 2018-09-20 2016-09-08 and Sanitation Services Quotations Envelope 20 water through Household connections in existing schemes under component 2A DWSS-W-DIV34-4810-1 / WSS village Chunni Kalan Block Khera District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 11,150.00 10,265.89 Signed 2018-09-20 2018-09-20 2016-09-16 Access to water through and Sanitation Services Quotations Envelope 20 Household connections in existing schemes under component 2A PRWSS-W-DIV34-3530-1 / WSS village Kheri Bhai Ki Block Khera District Fatehgarh Sahib: Providing Improved Inclusive Household Water Request for Single Stage - One 2018-09- IBRD / 84870 Post Open - National 1,430.00 1,378.61 Signed 2018-09-21 2018-09-21 2016-06-24 Access to water through and Sanitation Services Quotations Envelope 21 Household connections in existing scheme under Component 2B DWSS-W-DIV34-5599-1 / Surface WSS Vill. Nanowal Distt. Fatehgarh Sahib: Design & build W/S System incl. WTP, CW & RW Pump Station with Single Stage - Two 17,158,500.0 2019-10- machineries, CW mains up to IBRD / 84870 Improved Water Quality Prior Request for Bids Open - National 0.00 Canceled 2018-11-01 2018-12-07 2018-11-06 2018-12-12 2018-12-18 2019-03-02 2019-04-06 Envelope 0 03 OHSRs of existing village, inst.of bulk water meters, Solar Power System silent generator, transformer, SCADA/PLC PRWSS-W-DIV34-5701-1 / WSS village Nabipur block sirhind dist. Fatehgarh sahib: Providing Improved Access to Inclusive Household Water Request for Single Stage - One 2019-08- IBRD / 84870 Post Open - National 8,800.00 6,707.52 Signed 2018-12-08 2019-02-02 2019-03-08 water through Household and Sanitation Services Quotations Envelope 01 connections in existing schemes under component 2A. DWSS-W-DIV34-5696-1 / WSS village Pola block sirhind dist. Fatehgarh sahib: Prov Inclusive Household Water Request for Single Stage - One 2019-08- Improved Access to water IBRD / 84870 Post Open - National 8,850.00 5,947.21 Signed 2018-12-08 2019-02-02 2019-03-07 and Sanitation Services Quotations Envelope 01 through Household connections in existing shemes under component 2A. DWSS-W-DIV34-5693-1 / WSS vill Chaleri Khurd block sirhind dist. Fatehgarh sahib providing improved access to Inclusive Household Water Request for Single Stage - One 2019-08- IBRD / 84870 Post Open - National 7,000.00 5,893.03 Signed 2018-12-08 2019-02-02 2019-03-07 water through household and Sanitation Services Quotations Envelope 01 connections in existing schemes under component 2A. DWSS-W-DIV34-5695-1 / WSS village Naraingarh block: Amloh dist. Fatehgarh sahib: providing improved access to Inclusive Household Water Request for Single Stage - One 2019-08- IBRD / 84870 Post Open - National 10,800.00 8,009.96 Signed 2018-12-08 2019-02-02 2019-03-08 water through household and Sanitation Services Quotations Envelope 01 connections in existing schemes under component 2A. DWSS-W-DIV34-5694-1 / WSS village Jodhpur blk Bassi Pathana dist. Fatehgarh sahib providing improved access to Inclusive Household Water Request for Single Stage - One 2019-08- IBRD / 84870 Post Open - National 4,900.00 4,173.28 Signed 2018-12-08 2019-02-02 2019-02-22 water through household and Sanitation Services Quotations Envelope 01 connections in existing schemes under component 2A. Page 4 DWSS-W-DIV34-5702-1 / WSS village jatana Ucha block Khamano dist. Fatehgarh sahib: Providing improved Inclusive Household Water Request for Single Stage - One 2019-08- IBRD / 84870 Post Open - National 14,050.00 10,420.55 Terminated 2018-12-08 2019-02-02 2019-03-07 access to water through and Sanitation Services Quotations Envelope 01 household connections in existing schemes under component 2A. DWSS-W-DIV34-5737-1 / WSS Village Kareempura, Block Bassi Pathana, District Transformation - Improved Request for Single Stage - One 2019-08- Fatehgarh Sahib: Providing & IBRD / 84870 Post Open - National 40,900.00 33,481.80 Terminated 2018-12-22 2019-02-16 2019-07-27 Livability of Villages Quotations Envelope 15 Installing Tubewell, Construction of OHSR, Civil Work & O&M for 3 months PRWSS-W-DIV34-5770-1 / WSS Village Majri Kishne Wali, Block Amloh, District Fatehgarh Sahib.Providing and Transformation - Improved Request for Single Stage - One 2019-08- Installing Tubewell, IBRD / 84870 Post Open - National 70,000.00 55,984.22 Signed 2019-01-06 2019-03-03 2019-08-05 Livability of Villages Quotations Envelope 30 Construction of OHSR, Civil Works and O&M for 3 months under component 1A(ii) of PRWSSIP DWSS-W-DIV34-6643-1 / WSS Village Rangheri Khurd, Block Amloh, District Fatehgarh Sahib: Providing & Transformation - Improved Request for Single Stage - One 2020-04- Installing Tubewell, IBRD / 84870 Post Open - National 38,500.00 37,055.11 Signed 2019-07-20 2019-10-29 2019-11-07 Livability of Villages Quotations Envelope 26 Construction of OHSR, Civil Work & O&M for 3 mohths under component 1A (ii) of PRWSSIP. DWSS-W-DIV34-6642-1 / WSS Village Bagrian, Block Sirhind, District Fatehgarh Sahib: Providing & Installing Transformation - Improved Request for Single Stage - One 2020-04- IBRD / 84870 Post Open - National 50,800.00 44,836.13 Signed 2019-07-20 2019-10-29 2019-10-11 Tubewell, Construction of Livability of Villages Quotations Envelope 26 OHSR, Civil Work & O&M for 3 mohths under component 1A (ii) of PRWSSIP. DWSS-W-DIV34-6645-1 / WSS Village Sehzadpur, Block Bassi Pathana, District Fatehgarh SahibProviding & Transformation - Improved Request for Single Stage - One 2020-04- Installing Tubewell, IBRD / 84870 Post Open - National 44,000.00 0.00 Canceled 2019-07-20 2019-10-29 Livability of Villages Quotations Envelope 26 Construction of OHSR, Civil Work & O&M for 3 mohths under component 1A (ii) of PRWSSIP. DWSS-W-DIV34-6647-1 / WSS Village Sidhuwal, Block Amloh, District Fatehgarh Sahib: Providing & Installing Transformation - Improved Request for Single Stage - One 2020-04- IBRD / 84870 Post Open - National 44,000.00 38,895.32 Signed 2019-07-20 2019-10-29 2019-10-17 Tubewell, Construction of Livability of Villages Quotations Envelope 26 OHSR, Civil Work & O&M for 3 mohths under component 1A (ii) of PRWSSIP. DWSS-W-DIV34-6646-1 / WSS village Bharri block Khamano dist. Fatehgarh sahib: providing improved Inclusive Household Water Request for Single Stage - One 2019-12- IBRD / 84870 Post Open - National 14,000.00 12,500.69 Signed 2019-07-20 2019-10-29 2019-11-07 access to water through and Sanitation Services Quotations Envelope 28 household connections in existing schemes under component 2A.(i) DWSS-W-DIV34-6738-1 / WSS Village Mararu, Block Amloh, District Fatehgarh Sahib: Providing and Installing Transformation - Improved Request for Single Stage - One 2020-06- IBRD / 84870 Post Open - National 42,000.00 35,379.98 Signed 2019-09-07 2019-12-17 2020-01-07 Tubewell, Construction of Livability of Villages Quotations Envelope 14 OHSR, Civil Works and O&M for 3 months under component 1A(iii) of PRWSSIP. DWSS-W-DIV34-6883-1 / WSS village Tanda Badha Kalan Block Amloh: Providing Inclusive Household Water Request for Single Stage - One 2020-08- improved access to water IBRD / 84870 Post Open - National 14,000.00 11,677.05 Signed 2019-10-07 2020-02-10 2020-01-27 and Sanitation Services Quotations Envelope 08 through Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6831-1 / WSS village Fatehgarh Newan Block Amloh: Providing Inclusive Household Water Request for Single Stage - One 2020-08- improved access to water IBRD / 84870 Post Open - National 12,500.00 10,925.41 Signed 2019-10-07 2020-02-15 2020-01-24 and Sanitation Services Quotations Envelope 13 through Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6832-1 / WSS village Tooran Block Amloh: Providing improved Inclusive Household Water Request for Single Stage - One 2020-08- access to water through IBRD / 84870 Post Open - National 21,000.00 17,959.19 Signed 2019-10-07 2020-02-10 2020-01-24 and Sanitation Services Quotations Envelope 08 Household connections under Sub Component 2A of PRWSSIP. DWSS-W-DIV34-6888-1 / WSS village Amargarh Block Khamano : Providing Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 10,500.00 8,903.70 Signed 2019-10-07 2020-02-10 2020-01-23 improved access to water and Sanitation Services Quotations Envelope 08 through Household connections under component 2A of PRWSSIP. Page 5 DWSS-W-DIV34-6893-1 / WSS village Baina Bulandrh Block Khamano: Providing Inclusive Household Water Request for Single Stage - One 2020-08- improved access to water IBRD / 84870 Post Open - National 19,000.00 15,986.17 Signed 2019-10-07 2020-02-10 2020-03-11 and Sanitation Services Quotations Envelope 08 through Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6894-1 / WSS village Bainizer Block Amloh Providing improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 19,000.00 16,357.11 Signed 2019-10-07 2020-02-10 2020-01-27 access to water through and Sanitation Services Quotations Envelope 08 Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6887-1 / WSS village Charri Block Under Khamano Providing improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 13,000.00 0.00 Implementat 2019-10-07 2020-02-10 access to water through and Sanitation Services Quotations Envelope 08 ion Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6897-1 / WSS village Farour Block Khamano Providing improved Inclusive Household Water Request for Single Stage - One 2020-07- IBRD / 84870 Post Open - National 20,100.00 18,018.76 Signed 2019-10-07 2020-01-18 2020-01-24 access to water through and Sanitation Services Quotations Envelope 16 Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6885-1 / WSS village Kapoorgarh Block Amloh Providing improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 20,100.00 17,767.58 Signed 2019-10-07 2020-02-10 2020-01-24 access to water through and Sanitation Services Quotations Envelope 08 Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6886-1 / WSS village Paheri , Block Amloh Providing improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 16,500.00 13,537.27 Signed 2019-10-07 2020-02-10 2020-01-27 access to water through and Sanitation Services Quotations Envelope 08 Household connections under component 2A pf PRWSSIP. DWSS-W-DIV34-6833-1 / WSS village Mohan Majra Block Under KhamanoProviding improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 19,200.00 0.00 Implementat 2019-10-07 2020-02-10 access to water through and Sanitation Services Quotations Envelope 08 ion Household connections under component 2A of PRWSSIP DWSS-W-DIV34-6898-1 / WSS village Saidpura Block Khamano: Providing Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 14,100.00 11,972.05 Signed 2019-10-07 2020-02-10 2020-01-27 improved access to water and Sanitation Services Quotations Envelope 08 through Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6915-1 / WSS village Jatana Newan Block Khamano: Providing Inclusive Household Water Request for Single Stage - One 2020-08- improved access to water IBRD / 84870 Post Open - National 13,100.00 11,123.33 Signed 2019-10-07 2020-02-10 2019-12-13 and Sanitation Services Quotations Envelope 08 through Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6918-1 / WSS village Maneli Block KhamanoProviding improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 12,500.00 10,890.05 Signed 2019-10-07 2020-02-10 2020-01-20 access to water through and Sanitation Services Quotations Envelope 08 Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6919-1 / WSS village Nanowal Block KhamanoProviding improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 15,500.00 12,806.71 Signed 2019-10-07 2020-02-10 2020-01-20 access to water through and Sanitation Services Quotations Envelope 08 Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6913-1 / WSS village Badodhi Khurd Block SirhindProviding Inclusive Household Water Request for Single Stage - One 2020-08- improved access to water IBRD / 84870 Post Open - National 12,000.00 9,451.80 Terminated 2019-10-07 2020-02-10 2020-10-17 and Sanitation Services Quotations Envelope 08 through Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6917-1 / WSS village Kalewal Block Khamano Providing improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 18,000.00 16,159.43 Signed 2019-10-07 2020-02-10 2020-01-24 access to water through and Sanitation Services Quotations Envelope 08 Household connections under component 2A pf PRWSSIP. DWSS-W-DIV34-6923-1 / WSS village Sarana Block Under SirhindProviding improved Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 13,000.00 0.00 Implementat 2019-10-07 2020-02-10 access to water through and Sanitation Services Quotations Envelope 08 ion Household connections under component 2A of PRWSSIP DWSS-W-DIV34-6896-1 / WSS village Bhuteri Block Bassi Pathana Providing Inclusive Household Water Request for Single Stage - One 2020-08- improved access to water IBRD / 84870 Post Open - National 12,000.00 10,396.92 Signed 2019-10-07 2020-02-10 2020-02-03 and Sanitation Services Quotations Envelope 08 through Household connections under component 2A of PRWSSIP. DWSS-W-DIV34-6895-1 / WSS village Rangheri Kalan Block AmlohProviding Inclusive Household Water Request for Single Stage - One 2020-08- improved access to water IBRD / 84870 Post Open - National 18,500.00 16,015.53 Signed 2019-10-07 2020-02-10 2020-01-24 and Sanitation Services Quotations Envelope 08 through Household connections under component 2A of PRWSSIP. Page 6 DWSS-W-DIV34-7129-1 / WSS village Nalini Block Inclusive Household Water Request for Single Stage - One 2020-08- Sirhind: Providing improved IBRD / 84870 Post Open - National 11,000.00 9,442.29 Signed 2019-10-07 2020-02-10 2020-01-14 and Sanitation Services Quotations Envelope 08 access to water through Household connections DWSS-W-DIV34-6899-1 / WSS village Sidhupur Kalan Block Khamano: Providing Inclusive Household Water Request for Single Stage - One 2020-08- IBRD / 84870 Post Open - National 11,000.00 8,870.00 Signed 2019-10-07 2020-02-10 2020-01-16 improved access to water and Sanitation Services Quotations Envelope 08 through Household connections DWSS-W-DIV34-7030-1 / WSS village Tarkhan Majra Block Sirhind : Providing Inclusive Household Water Request for Single Stage - One 2020-09- IBRD / 84870 Post Open - National 22,500.00 19,599.48 Signed 2019-11-25 2020-03-30 2020-01-20 improved access to water and Sanitation Services Quotations Envelope 26 through Household connections DWSS-W-DIV34-6739-1 / WSS village Kumbh Block Inclusive Household Water Request for Single Stage - One 2020-09- Amloh Providing improved IBRD / 84870 Post Open - National 28,500.00 24,984.19 Signed 2019-11-25 2020-03-30 2020-01-24 and Sanitation Services Quotations Envelope 26 access to water through Household connections DWSS-W-DIV34-7028-1 / WSS village Mullanpur Kalan Under Block Sirhind : Providing Inclusive Household Water Request for Single Stage - One 2020-09- IBRD / 84870 Post Open - National 13,500.00 0.00 Implementat 2019-11-25 2020-03-30 improved access to water and Sanitation Services Quotations Envelope 26 ion through Household connections DWSS-W-DIV34-7172-1 / WSS village Chanarthal Kalan Block Sirhind : Providing Inclusive Household Water Request for Single Stage - One 2020-09- IBRD / 84870 Post Open - National 12,200.00 9,623.90 Terminated 2019-11-25 2020-03-30 2021-05-23 improved access to water and Sanitation Services Quotations Envelope 26 through Household connections DWSS-W-DIV34-7171-1 / WSS village Attapur Block Under Inclusive Household Water Request for Single Stage - One 2020-09- AmlohProviding improved IBRD / 84870 Post Open - National 11,000.00 0.00 Implementat 2019-11-25 2020-03-30 and Sanitation Services Quotations Envelope 26 access to water through ion Household connections DWSS-W-DIV34-6645- 1/CRS/RBD / REBIDDINGWSS Village Sehzadpur, Block Bassi Pathana, District Fatehgarh Transformation - Improved Request for Single Stage - One 2020-10- IBRD / 84870 Post Open - National 44,000.00 40,263.14 Signed 2019-12-09 2020-04-13 2020-02-24 Sahib : Providing & Installing Livability of Villages Quotations Envelope 10 Tubewell, Construction of OHSR, Civil Work & O&M for 3 mohths DWSS-W-DIV34-8117-1 / WSS village Panjkoha Block Khamano : Providing Inclusive Household Water Request for Single Stage - One 2022-01- improved access to water IBRD / 84870 Post Open - National 11,500.00 9,699.52 Signed 2020-10-19 2021-07-06 2020-08-24 and Sanitation Services Quotations Envelope 02 through Household connections in existing Rural Water Supply scheme DWSS-W-DIV34-8071-1 / WSS village Bag Sikandar Block Bassi Pathana Providing Inclusive Household Water Request for Single Stage - One 2022-01- improved access to water IBRD / 84870 Post Open - National 14,000.00 12,729.50 Signed 2020-10-19 2021-07-26 2020-08-24 and Sanitation Services Quotations Envelope 22 through Household connections in existing Rural Water Supply scheme DWSS-W-DIV34-8921-1 / WSS Village Chunni Kalan Block Khera district Fatehgarh Sahib: Providing improved Under Inclusive Household Water Request for Single Stage - One 2022-04- access to water through IBRD / 84870 Post Open - National 15,000.00 0.00 Implementat 2021-01-31 2021-10-18 and Sanitation Services Quotations Envelope 16 Household connections in ion existing Rural Water Supply scheme under component 2A (ii) DWSS-W-DIV34-8918-1 / WSS Village Chunni Khurd Block Khera district Fatehgarh sahib: Providing improved Under Inclusive Household Water Request for Single Stage - One 2022-04- access to water through IBRD / 84870 Post Open - National 11,000.00 9,767.15 Implementat 2021-01-31 2021-10-18 and Sanitation Services Quotations Envelope 16 Household connections in ion existing Rural Water Supply scheme under component 2A(ii) DWSS-W-DIV34-8917-1 / WSS village Pirjain Block Khera District Fatehgarh Sahib: Under Inclusive Household Water Request for Single Stage - One 2022-04- Providing improved access to IBRD / 84870 Post Open - National 11,000.00 10,290.82 Implementat 2021-01-31 2021-10-18 and Sanitation Services Quotations Envelope 16 water through Household ion connections in existing Rural Water Supply scheme. DWSS-W-DIV34-8720-1 / WSS Village Mangarh, Block Amloh, District Fatehgarh Under Sahib.Providing and Installing Transformation - Improved Request for Single Stage - One 2022-09- IBRD / 84870 Post Open - National 67,000.00 0.00 Implementat 2021-02-28 2021-12-05 Tubewell, Construction of Livability of Villages Quotations Envelope 01 ion OHSR, Civil Works and O&M for 3 months under component 1A(ii) of PRWSSI P DWSS-W-DIV34-8721-1 / WSS Village Majri, Block Khamano, District Fatehgarh Pending Sahib.Providing and Installing Transformation - Improved Request for Single Stage - One 2022-09- IBRD / 84870 Post Open - National 46,000.00 0.00 Implementat 2021-02-28 2021-12-05 Tubewell, Construction of Livability of Villages Quotations Envelope 01 ion OHSR, Civil Works and O&M for 3 months under component 1A(ii) of PRWSSIP Page 7 DWSS-W-DIV34-8719-1 / WSS village Annian Block Amloh Providing improved Transformation - Improved Request for Single Stage - One 2022-09- IBRD / 84870 Post Open - National 12,000.00 10,666.84 Signed 2021-02-28 2021-12-05 2020-12-22 access to water through Livability of Villages Quotations Envelope 01 Household connections under component 2A of PRWSSIP DWSS-W-DIV34-7243-1 / WSs village Sindhran Block Khera: Providing improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 33,200.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7238-1 / WSs village Pawala Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 30,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7235-1 / WSS village Kalour Block Bassi Pathana : Providing improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 44,500.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7234-1 / WSS village Mukaronpur Block Pending Inclusive Household Water Request for Single Stage - One 2022-05- Khera : Providing improved IBRD / 84870 Post Open - National 56,800.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 access to water through ion Household connections DWSS-W-DIV34-7237-1 / WSS village Patton Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 20,500.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7225-1 / WSS village Haripur Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 11,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7219-1 / WSS village Dubhali Block KheraProviding improved Under Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 46,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7242-1 / WSS village Shergarh Block Bassi PathanaProviding Pending Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 15,800.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7245-1 / WSS village Timberpur Block KheraProviding improved Under Inclusive Household Water Request for Single Stage - One 2022-06- access to water through IBRD / 84870 Post Open - National 15,000.00 0.00 Implementat 2021-02-28 2021-12-05 and Sanitation Services Quotations Envelope 03 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7173-1 / WSs village Badali Ala Singh Block Khera: Providing Pending Inclusive Household Water Request for Single Stage - One 2022-06- improved access to water IBRD / 84870 Post Open - National 33,500.00 0.00 Implementat 2021-02-28 2021-12-05 and Sanitation Services Quotations Envelope 03 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7226-1 / WSS village Harna Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 13,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7174-1 / WSS village Badali Mai Ki Block KheraProviding Pending Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 13,300.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7214-1 / WSS village Bhaini Kalan Block Khera: Providing Pending Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 38,500.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7218-1 / WSs village Chunni Majra Block Khera: Providing Under Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 10,500.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme Page 8 DWSS-W-DIV34-7240-1 / WSS village Rasulpur Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 16,500.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7220-1 / WSS village Dadiana Block Bassi Pathana Providing Under Inclusive Household Water Request for Single Stage - One 2022-07- improved access to water IBRD / 84870 Post Open - National 17,000.00 0.00 Implementat 2021-02-28 2022-01-24 and Sanitation Services Quotations Envelope 23 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-8390-1 / WSS Village Ajner, Block Khamano, District Fatehgarh Sahib: .Providing and Under Transformation - Improved Request for Single Stage - One 2022-10- Installing Tubewell, IBRD / 84870 Post Open - National 76,500.00 0.00 Implementat 2021-02-28 2022-01-24 Livability of Villages Quotations Envelope 21 Construction of OHSR, Civil ion Works and O&M for 3 months under component 1A(ii) of PRWSSIP DWSS-W-DIV34-7213-1 / WSS village Bhagrana Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 69,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7175-1 / WSS village Baher Block Bassi Pathana: Providing improved Under Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 27,100.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7241-1 / WSS village Rupalheri Block Bassi PathanaProviding Under Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 29,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7231-1 / WSs village Khanpur Behlan Block KheraProviding Pending Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 24,300.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7227-1 / WSs village Hindupur Block KheraProviding improved Under Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 38,100.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-4672-1 / WSs village Ramgarh Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 14,500.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7212-1 / WSs village Balari Khurd Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 37,100.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-8391-1 / WSS Village Tangrala, Block Amloh, District Fatehgarh Sahib.: Providing and Under Transformation - Improved Request for Single Stage - One 2022-10- Installing Tubewell, IBRD / 84870 Post Open - National 60,860.00 0.00 Implementat 2021-02-28 2022-01-24 Livability of Villages Quotations Envelope 21 Construction of OHSR, Civil ion Works and O&M for 3 months under component 1A(ii) of PRWSSIP DWSS-W-DIV34-7222-1 / WSS village Dufera Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 22,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7229-1 / WSS village Jhampur Block Khera: Providing improved Under Inclusive Household Water Request for Single Stage - One 2022-06- access to water through IBRD / 84870 Post Open - National 24,500.00 0.00 Implementat 2021-02-28 2021-12-05 and Sanitation Services Quotations Envelope 03 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7233-1 / WSS village Loha Kheri Block KheraProviding improved Under Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 38,100.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme Page 9 DWSS-W-DIV34-7224-1 / WSS village Gunia Majri Block Bassi Pathana Providing Pending Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 29,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7216-1 / WSS village Brass Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 19,200.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7230-1 / WSS village Kamali Block Bassi Pathana Providing Pending Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 18,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7221-1 / WSS village Daulatpur Block KheraProviding improved Under Inclusive Household Water Request for Single Stage - One 2022-04- access to water through IBRD / 84870 Post Open - National 14,000.00 0.00 Implementat 2021-01-31 2021-10-18 and Sanitation Services Quotations Envelope 16 Household connections in ion existing Rural Water Supply scheme for DWSS-W-DIV34-7236-1 / WSS Village Pamour Block KheraProviding improved Under Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 26,500.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7223-1 / WSS village Gadhera Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 33,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-7239-1 / WSS village Rajindergarh Block Khera : Providing Under Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 38,000.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7217-1 / WSS village Khanpur Behlan Block KheraProviding Pending Inclusive Household Water Request for Single Stage - One 2022-05- improved access to water IBRD / 84870 Post Open - National 24,700.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 through Household ion connections in existing Rural Water Supply scheme DWSS-W-DIV34-7232-1 / WSS village Hansali Block KheraProviding improved Pending Inclusive Household Water Request for Single Stage - One 2022-05- access to water through IBRD / 84870 Post Open - National 30,300.00 0.00 Implementat 2021-02-28 2021-11-15 and Sanitation Services Quotations Envelope 14 Household connections in ion existing Rural Water Supply scheme DWSS-W-DIV34-8989-1 / WSS Village Shekhupura, Block Sirhind, District Fatehgarh Under Transformation - Improved Request for Single Stage - One 2021-09- Sahib.Providing and Installing IBRD / 84870 Post Open - National 38,000.00 41,447.41 Implementat 2021-01-13 2021-03-07 Livability of Villages Quotations Envelope 03 Tubewell, Construction of ion OHSR, Civil Works and O&M for 3 months DWSS-W-DIV34-9344-1 / WSS Village Basantpura, Block National Sirhind, District Fatehgarh Procurement Pending Sahib: Providing and Installing Transformation - Improved Request for Single Stage - One 2022-03- IBRD / 84870 Post Open - National Document - 1 51,000.00 0.00 Implementat 2021-05-16 2021-07-03 Tubewell, Construction of Livability of Villages Quotations Envelope 30 Envelope process ion OHSR, Civil Works and O&M (Non Bank-SPD) for 3 months under component DWSS-W-DIV34-9579-1 / WSS Village Dhatounda, Block National Sirhind, Distt. Fatehgarh Procurement Pending Sahib: Providing improved Inclusive Household Water Request for Single Stage - One 2021-09- IBRD / 84870 Post Open - National Document - 1 12,000.00 0.00 Implementat 2021-05-16 2021-07-03 access to water through and Sanitation Services Quotations Envelope 01 Envelope process ion Household connections in (Non Bank-SPD) existing Rural Water Supply Scheme DWSS-W-DIV68-6839-2 / Section S540 : Providing National Improved Access to Water Procurement Pending Through Household Inclusive Household Water Request for Single Stage - One 2021-12- IBRD / 84870 Post Open - National Document - 1 81,000.00 0.00 Implementat 2021-05-23 2021-06-30 connections in existing 3 Nos. and Sanitation Services Quotations Envelope 27 Envelope process ion Rural Water Supply Schemes (Non Bank-SPD) Part-1, District Fatehgarh Sahib DWSS-W-DIV68-6839-3 / Section S540: Providing National Improved Access to Water Procurement Pending Through Household Inclusive Household Water Request for Single Stage - One 2021-12- IBRD / 84870 Post Open - National Document - 1 52,000.00 0.00 Implementat 2021-05-23 2021-06-30 connections in existing 2 Nos. and Sanitation Services Quotations Envelope 27 Envelope process ion Rural Water Supply Schemes ) (Non Bank-SPD) Part-2, District Fatehgarh Sahib Page 10 DWSS-W-DIV68-6839-4 / Section S541: Providing National Improved Access to Water Procurement Pending Through Household Inclusive Household Water Single Stage - Two 2021-12- IBRD / 84870 Post Request for Bids Open - National Document - 2 102,000.00 0.00 Implementat 2021-05-23 2021-06-22 2021-06-24 2021-06-29 2021-07-02 connections in existing 5 Nos. and Sanitation Services Envelope 29 Envelope process ion Rural Water Supply Schemes (Non Bank-SPD) Part-1, District Fatehgarh Sahib DWSS-W-DIV68-6839-5 / Section S541: Providing National Improved Access to Water Procurement Pending Through Household Inclusive Household Water Request for Single Stage - One 2021-12- IBRD / 84870 Post Open - National Document - 1 73,000.00 0.00 Implementat 2021-05-23 2021-06-30 connections in existing 5 Nos. and Sanitation Services Quotations Envelope 27 Envelope process ion Rural Water Supply Schemes (Non Bank-SPD) Part-2, District Fatehgarh Sahib DWSS-W-DIV68-6839-7 / Section S542: Providing National Improved Access to Water Procurement Pending Through Household Inclusive Household Water Single Stage - Two 2021-12- IBRD / 84870 Post Request for Bids Open - National Document - 2 107,000.00 0.00 Implementat 2021-05-23 2021-06-22 2021-06-24 2021-06-29 2021-07-02 connections in existing 7 Nos. and Sanitation Services Envelope 29 Envelope process ion Rural Water Supply Schemes (Non Bank-SPD) Part-1, District Fatehgarh Sahib DWSS-W-DIV68-6839-9 / Section S542: Providing National Improved Access to Water Procurement Pending Through Household Inclusive Household Water Single Stage - Two 2021-12- IBRD / 84870 Post Request for Bids Open - National Document - 2 107,000.00 0.00 Implementat 2021-05-23 2021-06-22 2021-06-24 2021-06-29 2021-07-02 connections in existing 7 Nos. and Sanitation Services Envelope 29 Envelope process ion Rural Water Supply Schemes (Non Bank-SPD) Part-2, District Fatehgarh Sahib DWSS-W-DIV68-6839-10 / Section S542: Providing National Improved Access to Water Procurement Pending Through Household Inclusive Household Water Request for Single Stage - One 2021-12- IBRD / 84870 Post Open - National Document - 1 80,000.00 0.00 Implementat 2021-05-23 2021-06-30 connections in existing 5 Nos. and Sanitation Services Quotations Envelope 27 Envelope process ion Rural Water Supply Schemes (Non Bank-SPD) Part-3, District Fatehgarh Sahib DWSS-W-DIV68-6839-12 / Section S544 : Providing National Improved Access to Water Procurement Pending Through Household Inclusive Household Water Single Stage - Two 2021-12- IBRD / 84870 Post Request for Bids Open - National Document - 2 125,000.00 0.00 Implementat 2021-05-23 2021-06-22 2021-06-24 2021-06-29 2021-07-02 connections in existing 4 Nos. and Sanitation Services Envelope 29 Envelope process ion Rural Water Supply Schemes (Non Bank-SPD) Part-1, District Fatehgarh Sahib DWSS-W-DIV68-6839-14 / Section S544 & 545: Providing National Improved Access to Water Procurement Pending Inclusive Household Water Request for Single Stage - One 2021-12- Through Household IBRD / 84870 Post Open - National Document - 1 91,000.00 0.00 Implementat 2021-05-23 2021-06-30 and Sanitation Services Quotations Envelope 27 connections in existing 6 Nos. Envelope process ion Rural Water Supply Schemes (Non Bank-SPD) District Fatehgarh Sahib GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PRWSS-G-DIV34-9526-1 / Section No. S-540: Supply, Installation, Commissioning, Operation & Maintenance (7 Pending Inclusive Household Water Request for Single Stage - One years) of Domestic Multi Jet IBRD / 84870 Post Open - National 30,000.00 0.00 Implementati 2021-05-16 2021-06-23 2021-10-21 and Sanitation Services Quotations Envelope water Meters in various on villages covere under Surface Water Project District Fatehgarh Sahib PRWSS-G-DIV34-9528-1 / Section No. S-541: stallation, Commissioning, Operation & Maintenance (7 years) of Pending Domestic Multi Jet water Inclusive Household Water Single Stage - Two IBRD / 84870 Post Request for Bids Open - National 113,000.00 0.00 Implementati 2021-05-16 2021-06-15 2021-06-22 2021-07-13 2021-07-27 2021-11-24 Meters conforming to IS: 779 and Sanitation Services Envelope on (B-Class) or ISO 4064 with 7 years repair/repl warranty and Related Infrastructure Work in various villages PRWSS-G-DIV34-9530-1 / Section No. S-542: Supply, Installation, Commissioning, Operation & Maintenance (7 Pending Inclusive Household Water Single Stage - Two years) of Domestic Multi Jet IBRD / 84870 Post Request for Bids Open - National 137,100.00 0.00 Implementati 2021-05-16 2021-06-15 2021-06-22 2021-07-13 2021-07-27 2021-11-24 and Sanitation Services Envelope water Meters various villages on covered under Surface Water Project District Fatehgarh Sahib PRWSS-G-DIV34-9532-1 / Section No. S-544 & S-545: Supply, Installation, Commissioning, Operation & Pending Maintenance (7 years) of Inclusive Household Water Request for Single Stage - One IBRD / 84870 Post Open - National 99,100.00 0.00 Implementati 2021-05-16 2021-07-03 2021-10-31 Domestic Multi Jet water and Sanitation Services Quotations Envelope on Meters in various villages covered under Surface Water Project District Fatehgarh Sahib NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 11 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 12 PROCUREMENT PLAN (Textual Part) Project information: Caribbean Region, Caribbean Digital Transformation Program, P171528 Project Implementation agency: Organisation of Eastern Caribbean States (OECS) Date of the Procurement Plan: November 11, 2020. Period covered by this Procurement Plan: The whole project life. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: The implementing agency is not a national state; hence, there is not a national market and there are no national procurement regulations. This notwithstanding, the implementing agency’s procurement procedures (OECS Procurement Manual Revised June 2016) were found acceptable to the Bank and therefore they may be applied for the Procurement of Works, Goods and Non-consulting Services below the mandatory thresholds for international competition (as specified in the Procurement Plan tables in STEP). These procurements should be in accordance with paragraph 5.3, 5.4 and 5.5 of the Procurement Regulations.. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: not applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – not applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: not applicable; Works: not applicable Other Relevant Procurement Information: The Implementing Agency will proceed with advance contracting in the amount of not exceeding SDR1,180,000.- (US$1.600,000.- equivalent) in accordance with the provisions of paragraph 5.1 – 5.2 of the Procurement Regulations. PROCUREMENT Caribbean : Caribbean Digital Transformation Project PLAN General Information Country: Caribbean Bank’s Approval Date of the Original Procurement Plan: 2021-01-20 2021-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171528 GPN Date: 2021-01-20 Project Name: Caribbean Digital Transformation Project Loan / Credit No: IDA / 66910 S Executing Agency(ies): VG - Ministry of Finance, Economic Planning, Sustainable Development, and Information Technology WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending SVGCARDTP-G-DC-1 / Digital Skills and Technology IDA / 66910 Post Direct Selection Direct 1,000,000.00 0.00 Implementati 2021-01-21 2021-01-26 2021-03-02 2021-08-29 Procurement of Tablets Adoption on Digital Government Pending SVGCARDTP-G-RFB-1 / Local Single Stage - One IDA / 66910 Infrastructure, Platforms and Post Request for Bids Open - National 300,000.00 0.00 Implementati 2021-10-19 2021-10-24 2021-12-05 2022-01-04 2022-02-08 2022-08-07 area network upgrade Envelope Services on Pending SVGCARDTP-G-RFQ-3 / Project Implementation Request for Single Stage - One IDA / 66910 Post Limited 20,000.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 Procurement of PIU equipment Support Quotations Envelope on SVGCARDTP-G-RFQ-1 / Digital Government Pending Request for Single Stage - One Procurement of equipment to IDA / 66910 Infrastructure, Platforms and Post Limited 60,000.00 0.00 Implementati 2021-06-12 2021-08-07 2022-02-03 Quotations Envelope digitize of paper-based deeds Services on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SVGCARDTP-NCS-RFB-1 / Digital Government Pending Single Stage - One Geodetic Survey and Geodetic IDA / 66910 Infrastructure, Platforms and Post Request for Bids Open - International 250,000.00 0.00 Implementati 2021-10-01 2021-10-06 2021-11-17 2021-12-17 2022-01-21 2022-07-20 Envelope Network Adjustment Services on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SVGCARDTP-C-QCBS-1 / Digital Government Digital Strategy, Standards, Quality And Cost- Pending IDA / 66910 Infrastructure, Platforms and Post Open - International 500,000.00 0.00 2021-10-07 2021-10-28 2021-12-11 2022-01-08 2022-02-07 2022-03-14 2022-04-18 2023-04-18 Business Continuity and Based Selection Implementation Services Protocols SVGCARDTP-C-QCBS-2 / Review of Policies, Legislations and Regulations and Development of Digital Government Recommendations on Quality And Cost- Pending IDA / 66910 Infrastructure, Platforms and Post Open - International 550,000.00 0.00 2021-10-07 2021-10-28 2021-12-11 2022-01-08 2022-02-07 2022-03-14 2022-04-18 2023-04-18 Necessary Reforms to Based Selection Implementation Services Implement an Integrated ID System, Authentication Platform, Digital Signature and Land Administration SVGCARDTP-C-QCBS-3 / Development of Technical Digital Government Requirements for ID System Quality And Cost- Pending IDA / 66910 Infrastructure, Platforms and Post Open - International 700,000.00 0.00 2021-10-07 2021-10-28 2021-12-11 2022-01-08 2022-02-07 2022-03-14 2022-04-18 2023-04-18 Implementation and business Based Selection Implementation Services process re-engineering of citizen facing digital services SVGCARDTP-C_QCBS-6 / Project Implementation Quality And Cost- Pending Project Implementation IDA / 66910 Prior Open - International 1,500,000.00 0.00 2021-06-07 2021-06-28 2021-08-11 2021-09-08 2021-10-08 2021-11-12 2021-12-17 2022-12-17 Support Based Selection Implementation Support SVGCARDTP-C-QCBS-7 / Development for Digital Government Quality And Cost- Pending implementation of parcel- IDA / 66910 Infrastructure, Platforms and Prior Open - International 1,000,000.00 0.00 2021-10-22 2021-11-12 2021-12-26 2022-01-23 2022-02-22 2022-03-29 2022-05-03 2023-05-03 Based Selection Implementation based Land Information Services System SVGCARDTP-C-QCBS-8 / Digital Government Assessment of Land Quality And Cost- Pending IDA / 66910 Infrastructure, Platforms and Post Open - International 200,000.00 0.00 2021-10-01 2021-10-22 2021-12-05 2022-01-02 2022-02-01 2022-03-08 2022-04-12 2023-04-12 Transaction Standardization Based Selection Implementation Services and design of One-stop-shop SVGCARDTP-C-QCBS-9 / Digital Government Development of Integrated Quality And Cost- Pending IDA / 66910 Infrastructure, Platforms and Post Open - International 400,000.00 0.00 2021-10-01 2021-10-22 2021-12-05 2022-01-02 2022-02-01 2022-03-08 2022-04-12 2023-04-12 Geospatial Information Based Selection Implementation Services Framework INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Individual SVGCARDTP-C-IC-1 / Project Project Implementation Under IDA / 66910 Post Consultant Limited 270,000.00 0.00 2021-03-19 2021-03-24 2021-03-24 2021-03-26 2021-04-14 2021-05-19 2021-11-15 Coordinator Support Implementation Selection Page 2 Plan de Passation de marchés I. Généralités 1. L'information sur le projet : Pays : Madagascar ; Emprunteur : République de Madagascar ; Nom de projet : Deuxième Projet de Gouvernance des Pêches et de Croissance Partagée du Sud-ouest de l’Océan Indien (SWIOFish2) Numéro du Crédit : P153370 Agence d’exécution du Projet : 2. Date d’approbation du Plan de passation de marchés par la Banque : 01 Février 2018 ; Révision : 09 Août 2018 ; 3. Date de notification du Plan Général de Passation de marchés : - ; 4. Période couverte par le Plan de Passation de marchés : Année 2018 II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable : Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le paragraphe 3.1 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) et sur la base de l'évaluation de la capacité de l'agence d’exécution : Méthode de Passation de Seuil de revue Commentaires marchés à priori 1. AOI – Ouvert ou Restreint (Biens) 2 000 000 Les montants 2. AON (Biens) 2 000 000 estimatifs des 3. AOI (Travaux) 10 000 000 marchés prévus 4. AON (Travaux) 10 000 000 sont au-dessous 5. AOI (Services) 2 000 000 des seuils. 6. UN -UNOPS (Biens) 2 000 000 Niveau de risque : 7. ED (Biens/Travaux) 2 000 000 « SUBSTANTIEL » 2. Pré-qualification (selon les dispositions des paragraphes 6.19 à 6.24 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable. 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 6.52 et 6.53 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Non Applicable 5. Tout autre arrangement spécial en passation de marchés : Non Applicable. 6. Allotissement de fournitures avec méthodes et calendrier : [Enumérer d’abord les allotissements qui nécessitent la revue préalable de la Banque, ensuite les autres allotissements] 1 2 3 4 5 6 7 8 9 Réf. Description Contrat Coût Approche/Méth Pré- Préféren Revue de la Date Commentair No estimatif ode de qualificati ce Banque (à prévue es sélection on national priori / à d’ouverture Oui / Non e posteriori) des Oui / Non soumission s MG- Matériels roulants (46Voitures : PM 1DSP – 2CEDP – 3SG – 3DGRHP 3 070 000 UNOPS Non Non Oui 01/07/2018 01/1 – 3RGPDD – 4ASH – 1USTA – 8 5CSP – 22 DRRHP – 2UGP) MG- PM Matériels roulants (20motos ; Non Non 59 000 UNOPS Non 01/07/2018 02/1 2USTA – 16UGL – 2UGP) 8 Matériels et équipement Informatiques (48 Ordinateurs de bureau – 45 Ordinateurs portables – 27 Onduleurs – Non Non Non MG- 4Stabilisateurs – 29Imprimantes PM AON/UNOP multifonctions – 52 Imprimantes 433 910 30/09/2018 03/1 S laser noir – 11Imprimantes laser 8 couleur – 29Photocopieuses – 10Vidéoprojecteurs – 10Appareils photo – 11GPS – 1Caméra – 32 Tablettes MG- PM Matériels et mobiliers de bureau Non Non Non 162 200 AON 30/09/2018 04/1 : 1DCI – 2USTA –8 UGL - 1UGP 8 MG- Commented [JM1]: 29 170 dans PPM d’aout PM Fournitures et articles de Non Non Non Commented [u2R2]: Omission de la ligne 47 170 DC 01/12/2018 05/1 bureau 4.1.3.2.1 de l’UGP d’un montant de 18.000USD 8 sur le PTBA 2018 MG- PM Non Non Non Consommables informatiques 73 170 DC 30/09/2018 06/1 8 MG- Kits d'équipements pour les PM enquêteurs (sac de couchage, Non Non Non 17 500 DC 15/10/2018 07/1 tente, torche, bottes, 8 imperméable) MG- Non Non Non Achat téléphone mobile pour la PM collecte de données au niveau 5 250 DC 01/12/2018 08/1 national 8 MG- Non Non Non Matériels d'échantillonnage PM (Blouse, gant, balance, pied a 1 000 DC 30/09/2018 09/1 coulisse…) 8 MG- Non Non Non Acquisition et installation d’un PM logiciel de suivi automatique 150 000 AON 01/12/2018 10/1 des captures (ERS); 8 MG- Non Non Non Dotation et moyens PM d'équipement pour les 48 000 DC 30/10/2018 11/1 membres du CSC 8 MG- Non Non Non PM Matériels de l'électrification 9 000 DC 30/10/2018 12/1 hors grille 8 MG- Non Non Non PM Equipements et outils de pêche 120 000 AON 01/10/2018 13/1 8 MG- Non Non Non Commented [JM3]: 115 000 dans PPM d’aout Outillage d'entretien d'engin et PM Commented [u4R4]: Après vérification du d'embarcation de pêche pour 60 000 AON 01/12/2018 14/1 PTBA Ligne 3.2.1.1.32 : il est prévu :12 lots à usage communautaire 8 5.000USD l’unité Appui à la mise à disposition Non Non Non MG- des équipements de base pour PM la sécurité des pêcheurs et de 165 000 AON 01/12/2018 15/1 leurs embarcations en mer 8 (gilet, miroir… pour la période transitoire) MG- Non Non Non PM Outils de valorisation 80 000 DC 01/12/2018 16/1 8 MG- Petits matériels de valorisation 80 000 DC Non Non Non 01/12/2018 PM 17/1 8 MG- Non Non Non Commented [JM5]: Combien de boites sont PM prévues ? Achat boites à plaintes 3 950 DC 30/09/2018 18/1 Commented [u6R6]: 79 boites à plaintes 8 suivant la ligne 3.2.3.4.4 du PTBA 2018 MG- Non Non Non PM Outillage pour les pépinières et 19 000 DC 01/12/2018 19/1 les reboisements (brouette,….) 8 MG- Non Non Non Renforcement de l'unité de PM gestion communautaire en 10 000 DC 01/12/2018 20/1 biens et équipements 8 MG- Acquisition, installation et test Non Non Non PM des biens et équipements 240 000 AON 01/12/2018 21/1 relatifs aux technologies hors 8 grille MG- Non Non Non PM Petit outillage et fournitures 417 DC 30/10/2018 22/1 d’atelier (unité) 8 MG- Non Non Non Construction des bureaux des 2 PM PIE de l'ASH en province : 60 000 DC 30/09/2018 23/1 Antsiranana et Morondava 8 Carénages du navire de Non Non Non MG- surveillance «Atsantsa », PM remplacement des appareils de 181 000 AON 30/08/2018 24/1 navigation/accessoires et pièces 8 de rechanges des moteurs auxiliaires MG- Non Non Non PM Carénage du navire de 76 000 DC 30/10/2018 25/1 surveillance "Telonify" 8 MG- Non Non Non PM Constructions pour les six (06) 420 000 AON 30/09/2018 26/1 DRRHP et huit (08) CIRRHP 8 MG- Non Non Non PM Construction de petits 350 000 AON 30/11/2018 27/1 débarcadères type ponton 8 Installation d'unités de Non Non Non fabriques de glace/chambres MG- froides fonctionnant avec des PM énergies renouvelables et 320 000 AON 30/11/2018 28/1 respectant l’environnement 8 pour maintenir la chaine de froid des produits halieutiques dès leur débarquement MG- Non Non Non PM Construction d'infrastructures 360 000 AON 01/12/2018 29/1 communautaires /communales 8 MG- Non Non Non Infrastructures d'électrification PM hors grille dans les 1 250 000 AON 01/12/2018 30/1 communautés pilotes 8 MG- Non Non Non PM Construction de bureau de 60 000 DC 30/07/2018 31/1 l'UGP centrale 8 7.858.197 TOTAL Biens – Equipements et Travaux III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans le paragraphe 3 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) : Méthode de sélection Seuil de Commentaires revue à priori 1. Méthode compétitive (firmes) 1 000 000 Les montants 2. Entente directe (firmes) 1 000 000 estimatifs des 3. Méthode compétitive (Consultant individuel) 300 000 contrats prévus sont 4. Entente directe (Consultant individuel) 300 000 au-dessous des seuils. Niveau de risque : « SUBSTANTIEL » 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de USD 150 000 par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 7.25 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016). 3. Tout autre arrangement spécial de Sélection de consultants : Non applicable 4. Tâches de consultation avec des méthodes de sélection et calendrier Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions Etude et analyse diagnostiques des MG-PM stratégies du secteur et des anciens 75 000 CI NON 01/05/2018 32/18 plans directeurs et élaboration du nouveau plan directeur Mise à jour de la Stratégie Nationale de MG-PM l’Aquaculture (Consultant national + 30 000 CI NON 30/08/2018 33/18 Réunions (1 consultation, 1 validation) Etude sur les procédures MG-PM administratives régissant l’accès aux 70 000 CI NON 30/07/2018 34/18 ressources et examen des options et recommandations (6 outils de gestion) Elaboration de la stratégie d'adaptation MG-PM du secteur pêche face au changement 10 000 CI NON 01/09/2018 35/18 climatique Amélioration de la base de données pour la déclaration des produits de la Commented [JM8]: Est-ce que l augmentation MG-PM pêche régionale (Base de données- 10 000 CI NON 30/08/2018 de 35 000 à 58 500 justifié par l’ajout de la 36/18 Tableau de bord-Système d'Information partie CFTP non prévue au PPM d’aout. Pêche : basé sur le Web, consultant) Commented [u9R9]: Faisant suite aux Amélioration de la base de données instructions de l’Equipe PPM de la BM, on a MG-PM pour les pêcheries industrielles 10 000 CI NON 30/09/2018 regroupée les études techniques et les études 37/18 Impacts pour l’OEPA régional et central – CFTP (consultant) Etude technique et étude d'impact et Enceinte Fénerive Est suivant les lignes du PTBA suivantes ; 2.1.2.3.6 – 2.1.2.3.7 – 2.1.2.5.2 environnemental et social de Etude groupée – 2.1.2.5.3 – 2.3.2.1.1 – 2.3.2.2.1.2 – 3.2.1.1.3 et MG-PM l'extension ou construction du bureau MG-PM 38-39-40- 3.2.1.1.4 58 500 SFQC NON 30/10/2018 92/18 régional et central de l’OEPA, de 41-55-56-62- réhabilitation du CFTP , Clôture de 63/18 Commented [JM7]: Est-ce que les études techniquesenv. Pour l’enceinte de la DRRHP de l’enceinte DRRHP Fenerive Fenerive ne pourrait pas être plutôt ajouter à la PA65 ? Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions Elaboration stratégie nationale de MG-PM recherches halieutiques (1 Consultant 50 000 CI NON 30/07/2018 42/18 international et 3 consultants nationaux) MG-PM Etude sur les mesures de gestion des 30 000 CI NON 30/07/2018 43/18 poulpes Avis scientifique pour la gestion des MG-PM pêcheries de langoustes, dans les sites 30 000 CI NON 30/07/2018 44/18 prioritaires Développement des points de référence MG-PM opérationnels pour la gestion de la 75 000 CI NON 30/07/2018 45/18 pêche crevettière Révision du système de suivi de la MG-PM pêche crevettière traditionnelle (PCT) 86 000 SFQC NON 30/07/2018 46/18 et élargissement à toutes les zones de pêche MG-PM Révision par les pairs des modèles 86 000 SFQC NON 30/07/2018 47/18 d'évaluation des stocks de crevettes Étude technique sur la stratégie de NON Commented [JM10]: 60 000 dans le PPM MG-PM surveillance et sur le fonctionnement 15 000 SFQC 30/07/2018 d’aout 49/18 du CSP Commented [u11R11]: Après vérification du Frais d'équipage durant les travaux de NON PTBA 2018 ligne 2.2.2.1.1, pour 2018 on a prévu MG-PM carénages (vivres+ indemnités + 25 000 CI 01/08/2018 01 étude pour 15.000USD le coût unitaire 50/18 carburants) MG-PM Assistance technique pour le suivi des 26 000 CI NON 30/09/2018 51/18 travaux de carénage de l'Atsantsa MG-PM NON Rédaction d’un plan national de lutte 52/18 52 000 CI 30/07/2018 contre la pêche INN Extension de l’ERS vers la flotte NON MG-PM nationale (Etude / subvention/ cout 50 000 CI 30/10/2018 53/18 interne CSP) Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions Etude et élaboration de mécanisme NON MG-PM structurel de plateforme de cogestion 50 000 CI 30/07/2018 54/18 des filières prioritaires (crabes, poulpes, langoustes, holothuries, crevettes) Études techniques et études d’impact SFQC NON Commented [JM13]: 50 000 dans le PPM environnemental et social pour la Etude groupée d’aout PA 65 Construction des Bureaux de six (06) 70 000 30/07/2018 MG-PM 57-58-85– Commented [u14R14]: Cette ligne regroupe DRRHP et neuf (09) CirRHP et d’un local 86/18 les études MG-PM 57-58-85 et 85 du PPM d’Août, pour bureau de l’UGP réf PTBA 2018 : 2.3.2.1.3 – 2.3.2.1.4 – 4.1.4.1.1 Etude sur l'identification des 180 000 SFQC NON et 4.1.4.1.2 bénéficiaires, du montant et des Commented [u12]: Après vérification PTBA modalités de transfert financier et sur Etude groupée 2018 lignes 2.3.2.1.3 et 2.3.2.1.4 c’est 08 MG-PM la détermination du montant minimal MG-PM 59-18 et 93/18 30/04/2018 de filet social pour les pêcheurs/acteurs MG-PM 60-18 filières affectés par les mesures de gestion MG-PM Recensement et identification des 20 000 CI NON 30/05/2018 61/18 bénéficiaires chaque année Etude sur l'amélioration des SFQC NON MG-PM embarcations existantes à partir des 270 000 01/11/2018 64/18 matériaux locaux bon marché et existants pour chaque ZUP Etude sur l'identification de techniques NON MG-PM modernes de pêche et de fabrication 60 000 SFQC 30/07/2018 65/18 d'engins de pêche adaptés pour chaque ZUP Prestataire formateur en construction 30 000 CI NON MG-PM et entretien des embarcations de pêche 30/11/2018 66/18 (par an) Prestataire formateur en construction 30 000 CI NON MG-PM et entretien des engins de pêche (par 30/08/2018 67/18 an) Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions Etude sur le circuit de 90 000 SFQC NON MG-PM commercialisation des produits des 30/03/2018 68/18 pêches par ZUP MG-PM ""Etude sur les accidents en mer de la 90 000 SFQC NON 30/04/2018 69/18 pêche à petite échelle""" ""Développement du système de SFQC NON MG-PM valorisation des produits halieutiques 60 000 30/03/2018 70/18 adaptées pour chaque ZUP""" " Étude de marché pour les produits de SFQC MG-PM pêche valorisés dans chaque région 90 000 NON 30/04/2018 71/18 ultra prioritaire (1 étude par région)" MG-PM Prestataire formateur en technique de CI NON 75 000 30/03/2018 72/18 valorisation (par an) MG-PM Prestataire formateur en technique CI NON 25 000 28/02/2018 73/18 commerciale (par an) MG-PM "Analyse des besoins en activités SFQC NON 74/18 alternatives adaptées pour chaque ZUP 210 000 30/05/2018 (exécutée par AGEX)" Evaluation des impacts socio- SFQC NON MG-PM économiques de la mise pratique des 90 000 30/09/2018 75/18 activités alternatives MG-PM Elaboration des Plans d'Action aux 60 000 CI NON 28/02/2018 76/18 restrictions de Ressources (PARAR) Détermination des outils financiers de NON PA40 gestion des revenus issus des filières et 60 000 CI activités alternatives MG – PM Cabinet d’étude ou d’une ONG pour 600 000 SFQC NON 117/18 assurer les missions de l’AGEX (PAP 01/06/2018 MELAKY) Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions MG – PM Cabinet d’étude ou d’une ONG pour 600 000 SFQC NON 117/18 assurer les missions de l’AGEX (PAP 01/06/2018 BATAN) MG – PM Cabinet d’étude ou d’une ONG pour 600 000 SFQC NON 117/18 assurer les missions de l’AGEX (PAP 01/06/2018 Baie d’Antongil) Elaboration de plan de formation des CI NON élus et acteurs communaux MG-PM (Fokontany, Mairie,…) pour la gestion 18 000 01/06/2018 77/18 et la pérennisation des infrastructures de pêches et communautaires MG-PM Elaboration du plan stratégique de CI NON 80 000 30/01/2018 78/18 développement local (PCD et PLD) Etat de lieux des petites infrastructures CI NON MG-PM de pêches et identifications des besoins 79/18 60 000 01/04/2018 des communautés cibles en petites infrastructures de pêche Etude de faisabilité technique des NON constructions d'infrastructures de pêche (APS & APD) (33 débarcadères, 8 MG-PM marchés couverts, 70 salles réunion et 550 000 SFQC 01/08/2018 80/18 hangars d'entretien des embarcations, 28 fabriques de glace) MG-PM Etude d'impact environnemental et 275 000 SFQC NON 01/08/2018 81/18 social Préparation du plan local NON Ligne d’activité à Commented [JM15]: Pas de montant? MG-PM d'électrification communautaire : étude CI 01/03/2018 retirer dans ce Commented [u16R16]: Omission de montant 82/18 et rapports PPM dans le PTBA réf 3.3.3.1.3 – Après consultation Gestion et mise en œuvre : évaluation NON de RC3, le type de coût CS est changé en OP car MG-PM cette activité fait partie d’objet de convention de la mise en place de l'électrification 15 000 CI 01/12/2018 83/18 avec l’ADER. De ce fait, cette ligne ne fera plus hors grille partie des études dans le PPM 2018 Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions MG-PM Gestion et mise en œuvre : Suivi 40 000 CI NON 15/10/2018 84/18 évaluation des bases de données MG-PM Enquête de situation de référence des SFQC NON 50 000 30/07/2018 87/18 bénéficiaires MG-PM Audit externe des comptes du Projet 15 000 SMC NON 01/12/2018 88/18 MG-PM Elaboration d'une stratégie du plan de CI NON 10 000 30/09/2018 89/18 communication du projet SWIOFish2 MG-PM Mise en place du site internet du projet CI NON 2 000 30/09/2018 90/18 SWIOFish2 MG-PM CI NON Assistance technique - maintenance 500 30/09/2018 91/18 TOTAL Consultances 5.264.000 IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier 1. Dans cette section, les activités de renforcement de capacité acceptées (quelques articles pourraient être des recommandations de CPAR) sont énumérées avec le calendrier No. Résultats escomptés / Description Coût Durée Date de Commentaire de l’activité estimatif estimative début s (jours) MG-FO Ateliers nationaux pour la 12.000 01-18 validation des textes d'application avec CRDA MG-FO Formation SLC (technique de 18.000 02-18 négociation, leadership etc.) MG-FO Tenir un atelier national relatif à 7.500 03-18 la communication de la nouvelle loi portant Code de la Pêche et de l'Aquaculture à Madagascar MG-FO Atelier national de préparation de 3.000 02 04-18 l'élaboration du nouveau plan directeur MG-FO Atelier national de validation du 6.000 01 05-18 plan directeur MG-FO Visite d'échange d'expérience en 40.000 06-18 matière de technique de production et d'exploitation aquacole marine (ex: grouper sp, algue marine, crabe) MG-FO Formation provinciale sur 27.000 07-18 nouvelles procédures de marquage, de délivrance des cartes pêcheurs et mareyeurs MG-FO Formation des cadres supérieurs 123.000 08-18 (6+6) dans la collecte des données et statistiques de pêche (formation FAO/ISSEA) MG-FO Formation des 10 enquêteurs en 2.000 09-18 méthodologie de collecte de données par téléphone mobile pour les 2 ZUP (DIANA et Analanjirofo; soit 5 enquêteurs/région) MG-FO Formation de 05 cadres 25.000 10-18 supérieurs dans l'analyse des données MG-FO Formation de 05 cadres 25.000 11-18 supérieurs en IT MG-FO Participation à des réunions et 10.000 12-18 ateliers régionaux per diem et hôtel et frais d'avion MG-FO Renforcement des 13-18 capacités des personnels 15.000 techniques de l'OEPA (économie des ressources naturelles et économie des pêches) MG-FO Ateliers régionaux sur la 36.000 14-18 stratégie nationale (pour les 6 ex- provinces) MG-FO Atelier national sur la stratégie 3.000 15-18 nationale MG-FO Formations et voyages d’échange 100.000 16-18 d’expérience et de la bonne pratique (renforcement des capacités, Ateliers de restitution et de validation des travaux de consultance, coûts des voyages, frais de participations, indemnités…) MG-FO Renforcement de capacité des 50.250 17-18 agents chercheurs (formations extérieures) MG-FO Participation à des forums de 52.500 18-18 recherche MG-FO Formation de l'équipe (média, 15.000 19-18 audio-visuel, design, PAO, site web, prog. éducatifs) MG-FO Renforcement de capacité des 5.000 20-18 membres du bureau de coordination pêche environnement (environnement pêche et mer) MG-FO Organisation des réunions 46.000 21-18 semestrielles MG-FO Formation en QMS d’une Autorité 14.300 22-18 Compétente par formateur international pour renforcement de capacités en Audit interne d’une Autorité compétente (Maitrise des documents et des enregistrements) MG-FO Formation en Informatique & 23-18 Base de données : Avec 24.000 formateur national : Informatique (bureautique et programmation) / Utilisation & gestion de base de données MG-FO Linguistique : Avec formateur 15.140 24-18 national : Anglais / Chinois MG-FO Formation en Aquaculture : Avec 22.640 25-18 formateur international : Technique d’élevage et gestion de risque / Méthode de contrôle appliquée dans divers système d’aquaculture (Diana 3 personnes; Melaky 7; Central 2) MG-FO Formation en système de 26-18 Biosécurité : Avec formateur 22.640 international : Biosécurité appliquée aux animaux aquatiques (Diana 3 personnes; Melaky 7; Central 2) MG-FO Formation en Système de 22.640 27-18 management de la QHSE Sanitaire : Avec formateur international : Hygiène et pré requis au niveau des établissements / Normes ISO sur la sécurité sanitaire des aliments / HACCP / Evaluation & analyse des risques MG-FO Formation en Gestion des crises : 28-18 Avec formateur international : 22.640 RASFF MG-FO Formation en Système de 20.200 29-18 certification : Avec formateur international : TRACES MG-FO Formation en Accord International 22.640 30-18 : Avec formateur international : Accord SPS&OMC MG-FO Formation en Science & 22.640 31-18 Technologie : Avec formateur international : Microbiologie des aliments et de l’eau / Toxicologie appliquées aux produits de la mer / Science & Technologie des aliments MG-FO Formation en Technique 2.830 32-18 d’analyse : Avec formateur national : Technique d’analyse de détection des maladies aquatiques MG-FO Formatio 22.640 33-18 n en Technique d’analyse et Technique d’échantillonnage : Avec formateur international MG-FO Formation en Administration : 34-18 Avec formateur national : 15.64 Formation en officier de police 0 judiciaire MG-FO Formation en Administration : 2.840 35-18 Avec formateur national : Procédures Banque Mondiale (Passation de marché, suivi- évaluation MG-FO Formation en QMS d’une Autorité 24.000 36-18 Compétente : Avec formateur international : Structuration et management Qualité d’une Autorité Compétente (ISO 17020) MG-FO Formation en Aquaculture : Avec 37-18 formateur international : 40.000 Aquaculture & environnement MG-FO Formation en Contrôles officiels : 38-18 Avec formateur international : 32.000 Echange d’expérience par jumelage régionale MG-FO Formation en Système de 39-18 management de la QHSE 8.000 Sanitaire : Avec formateur international : Audit de laboratoire selon ISO 17025 MG-FO Formation en Technique 8000 40-18 d’analyse : Avec formateur international : Technique d’analyse officielle MG-FO Formation en Technique 41-18 d’analyse : Avec formateur 8.000 international : Métrologie MG-FO Participation aux réunions et 134.000 42-18 groupes de travail CTOI et ORP MG-FO Réunion nationale (50 personnes 43-18 de 2 jours) de concertation sur la 6.000 pêche aux requins, oiseaux de mer, tortues MG-FO Participation aux réunions 100.500 44-18 régionales pour les termes minimaux des accords de pêche MG-FO Réunions de consultation 6.000 45-18 nationales sur la préparation des Mesures de conservation et de gestion (pour 6 réunions par an) MG- Formation sur l'identification des 8.500 FO46-18 espèces thonières et les techniques d'échantillonnage au débarquement MG-FO Formation sur la gestion des 8.500 47-18 données MG-FO Atelier de validation de nouveaux 75.000 48-18 PAP MG-FO Visite d'échange et d'expérience 31.000 49-18 sur l'utilisation du logiciel ERS MG-FO Formation du personnel à 60.600 50-18 l’utilisation et à l’exploitation de cet outil. MG-FO Renforcement de capacité et 51-18 formation des membres des CSC 24.000 MG-FO Ateliers de lancement régionaux 30.000 52-18 sur les plateformes de cogestion (crabes, poulpes, langoustes, holothuries, crevettes) dans les régions MG-FO Formations et remise à niveau au 112.500 53-18 niveau national des cadres MG-FO Formations et remise à niveau 100.000 54-18 des cadres à l'extérieur MG-FO Atelier de restitution de l'étude 55-18 sur l'identification des 20.000 bénéficiaires, du montant et des modalités de transfert financier et du filet social MG-FO Ateliers de validation des 3.000 56-18 référentiels (diplôme, certificat, attestation) MG-FO Formation des techniques 60.000 57-18 modernes de pêche MG-FO Formation en construction 60.000 58-18 et entretien d'engin de pêche MG-FO Formation sur les techniques 60.000 59-18 commerciales des produits des pêches MG-FO Atelier de restitution de l'étude 20.000 60-18 sur l'accidentologie MG-FO Visite d'échange dans le cadre de 90.000 61-18 la sécurité en mer et de la professionnalisation (Philippine, …) MG-FO Ateliers de validation régionale 62-18 (03) et nationale (01) de l'étude 16.000 diagnostic des techniques de valorisation MG-FO Voyage de partage d’expérience 63-18 dans les régions ou pays voisins, 90.000 où la formation et l’appui en valorisation ont été effectives et ont apporté des effets positifs MG-FO Formation des personnes dans la 64-18 communauté de pêcheurs (pêcheurs, femmes de pêcheur, jeunes sans emploi) en 72.000 techniques de valorisation (15 personnes formées par village) MG-FO Formation des acteurs pratiquant 72.000 65-18 les techniques de valorisation sur la gestion des activités commerciales, la prospection des marchés, les techniques de négociation et le marketing et conditionnement MG-FO Voyages d’échange d’expérience 16.000 66-18 pour les acteurs formés et ayant pratiqué la commercialisation au niveau d’un district littoral accompagnés des agents de la CirRHP/DRRHP/MRHP (1 par année par district) (50 acteurs par voyage) MG-FO Ateliers de restitution régionaux 67-18 et des ateliers de validation 24.000 nationale de l'étude diagnostic des besoins en activités alternatives MG-FO Voyages d’échange d’expérience 45.000 68-18 dans des pays semblables à Madagascar pour les bénéficiaires (Afrique australe, régions de la COI et en Asie) MG-FO Prestation à la formation des 50.000 69-18 cibles en activités alternatives MG-FO Formation des techniciens de 9.000 70-18 l’Administration (DRRHP et CirRHP) et l’UGL sur les techniques et le système de suivi de ces techniques (par région) MG-FO Formation des pêcheurs, femmes 480.000 15 71-18 de pêcheurs et jeunes dans les villages de pêcheurs en techniques de production appropriées pour chaque type d’activité alternative choisi (15j*8000) MG-FO Formation des pêcheurs, femmes 05 72-18 de pêcheurs et jeunes sans 100.000 emploi en techniques d’aquaculture (5 jours) MG-FO Formation et d'échange 90.000 73-18 d'expérience à l'étranger dans le cadre de l'aquaculture (algoculture, pisciculture, crabiculture,…) MG-FO Formation des acteurs pratiquant 80.000 04 74-18 les activités alternatives sur la gestion des activités commerciales, la prospection des marchés, les techniques de négociation et le marketing et conditionnement (4 jours) MG-FO Visites de la vitrine/ ferme école 72.000 75-18 pour les acteurs formés MG-FO Orientation des pêcheurs dans la 1.600 02 76-18 valorisation de leur biodiversité et les former en guide touristique MG-FO Sélection et formation des PF au 12.000 77-18 fonctionnement du MDGP MG-FO Ateliers de validation régionale 16.000 78-18 (03) et nationale (01) MG-FO Visite d’échange d’expérience 32.000 79-18 nationale (1 voyage par an par district) MG-FO Voyage de partage d’expérience 45.000 80-18 à l’étranger (01 voyage par an) MG-FO Séminaire/atelier international 70.000 81-18 (02 voyages par an) MG-FO Formation de courte durée à 45.000 82-18 l’étranger (01 voyage par an) MG-FO Réunions de sensibilisation et de 192.000 03 83-18 formation en éducation financière des petits pêcheurs et aquaculteurs à petite échelle (200 villages de pêcheurs) MG-FO Réunions de sensibilisation pour 64.000 01 84-18 la constitution en organisation appropriée des bénéficiaires du projet (200 villages de pêcheurs) MG-FO Promotion des services financiers 48.000 85-18 adéquats et adaptés à chaque zone d’intervention à travers des sensibilisations MG-FO Renforcement de capacité des 150.000 86-18 cadres et élus au niveau local MG-FO Renforcement de capacité des 9.000 87-18 UGL MG-FO Ateliers régionaux (03) et national 16.000 88-18 de validation MG-FO Atelier de réception locale de 4.000 89-18 l’infrastructure construite MG-FO Partage d'expérience à l'étranger 45.000 90-18 (2 missions par an) dans le cadre de la gestion communautaire des infrastructures de pêche MG-FO Formation des groupements de 8.000 91-18 pêcheurs pour être dans des comités de gestion et formation sur la gestion des infrastructures MG-FO Formation des groupements de 36.000 92-18 pêcheurs pour être dans des comités de gestion et formation sur la gestion des infrastructures MG-FO Formation des communautés 55.800 93-18 pilote sur les procédures réglementaires dans le cadre de l'électrification hors grille MG-FO Formation des communautés 90.000 94-18 pilotes à l'usage et à la gestion de l'électrification hors grille MG-FO Engagement communautaire 75.000 95-18 (IEC) dans le cadre de l'électrification hors grille MG-FO Gestion et mise en œuvre : 27.900 96-18 diffusion de connaissances MG-FO Participation à des ateliers de 10.000 97-18 partage MG-FO Formation modulaire spécifique 20.250 98-18 (langues, communication, informatique, …) MG-FO Formation modulaire (Gestion de 120.000 99-18 projet, suivi et évaluation, sauvegarde environnementale, techniques de négociations, SIG, …) MG-FO Formation de l'équipe (média, 37.500 100-18 audio-visuel, design, PAO, site web, prog. éducatifs) MG-FO Formation sur les procédures de 22.500 101-18 la Banque mondiale MG-FO Organisation des ateliers 17.000 102-18 MG-FO Formation relative à l'utilisation 11.400 103-18 de logiciel SE MG-FO Renforcement de capacité des 104-18 UGL sur le SE 7.500 MG-FO Atelier participatif de Suivi 105-18 Evaluation avec UGP- UGL- 3.000 MRHP-AGEX TOTAL Renforcement de capacité 4.396.730 PROCUREMENT Southern Africa : Second South West Indian Ocean Fisheries Governance and Shared Growth Project - Madagascar PLAN General Information Country: Southern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-04-06 2021-05-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153370 GPN Date: Project Name: Second South West Indian Ocean Fisheries Governance and Shared Growth Project - Madagascar Loan / Credit No: IDA / Q9790, IDA / 59870, IDA / D1720, IDA / V0500, TF / A4588 MINISTRY OF HALIEUTIC RESSOURCES AND FISHERIES Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MG-MRHP-28163-CW- Component 2. RFB//MG-PM-11 / Strengthening capacities for Open - Single Stage - Two 2017-09- 2017-10- 2017-12- 2018-02- 2018-04- 2018-10- IDA / D1720 Post Request for Bids 76,000.00 0.00 Canceled Carénages du navire de priority fisheries International Envelope 30 21 05 24 07 04 surveillance «Telonify », management MG-MRHP-28164-CW- Component 3. RFB//MG-PM-12 / Strengthening capacities for Single Stage - Two 2017-11- 2017-12- 2018-02- 2018-04- 2018-06- 2018-12- Construction IDA / 59870 engaging in alternative Post Request for Bids Open - National 200,000.00 0.00 Canceled Envelope 30 21 04 26 07 04 d'infrastructures fishing practices and communautaires livelihoods activities /communales MG-MRHP-28634-CW- RFB//MG-PM-105 / Carénages du navire de Component 2. surveillance «Atsantsa », Strengthening capacities for Open - Single Stage - Two 2018-02- 2019-01- 2018-03- 2018-04- 2018-08- 2018-09- 2019-03- IDA / D1720 Post Request for Bids 181,000.00 0.00 Canceled remplacement des appareils priority fisheries International Envelope 28 28 14 28 02 13 12 de navigation/accéssoires et management pièces de rechanges desmoteurs auxiliaires MG-MRHP-28642-CW- Component 3. RFB//MG-PM-107 / Strengthening capacities for Single Stage - Two 2018-06- 2018-07- 2018-08- 2018-11- 2018-12- 2019-06- IDA / 59870 Post Request for Bids Open - National 50,000.00 0.00 Canceled Rehabilitation du CFTP Nosy engaging in alternative Envelope 29 13 27 16 28 26 be fishing practices and livelihoods activities MG-MRHP-28648-CW- Component 3. RFB//MG-PM-110 / Strengthening capacities for Single Stage - One 1,250,000.0 2018-04- 2018-05- 2018-06- 2018-09- 2019-03- Infrastructures IDA / V0500 engaging in alternative Post Request for Bids Open - National 0.00 Canceled Envelope 0 30 14 25 20 19 d'électrification hors grille fishing practices and dans les communautés livelihoods activities pilotes MG-MRHP-96947-CW-RFQ / Carénage du navire de Component 2. surveillance "Atsantsa", Under Strengthening capacities for Request for Single Stage - One 2019-03- 2019-02- 2019-05- 2019-11- remplacement des appareils IDA / D1720 Post Limited 181,000.00 24,235.64 Implementa priority fisheries Quotations Envelope 08 11 28 24 de navigation/ accessoires et tion management pièces de rechanges des moteurs auxiliaires. MG-MRHP-100097-CW-RFQ Component 2. Request for Single Stage - One 2019-02- 2018-07- 2019-04- 2018-09- 2019-10- / Carénages du navire de IDA / D1720 Strengthening capacities for Post Limited 76,000.00 101,079.93 Completed Quotations Envelope 17 23 14 17 11 surveillance «Telonify » priority fisheries management MG-MRHP-28432-CW- Component 2. RFB//MG-PM-101 / Strengthening capacities for Open - Single Stage - Two 2019-07- 2019-07- 2019-08- 2019-11- 2019-12- 2020-06- IDA / 59870 Post Request for Bids 60,000.00 0.00 Canceled Extension ou construction du priority fisheries International Envelope 01 15 29 18 30 27 bureau régional OEPA : 03 management MG-MRHP-28436-CW- Component 2. RFB//MG-PM-102 / Strengthening capacities for Open - Single Stage - Two 2019-07- 2019-07- 2019-09- 2019-12- 2020-01- 2020-07- IDA / 59870 Post Request for Bids 40,000.00 0.00 Canceled Construction du bâtiment priority fisheries International Envelope 15 29 12 02 13 11 central de l'OEPA : 01 management MG-MRHP-28438-CW- Component 2. RFB//MG-PM-103 / Mise en Strengthening capacities for Open - Single Stage - Two 2019-07- 2019-07- 2019-08- 2019-11- 2019-12- 2020-06- IDA / 59870 Post Request for Bids 100,000.00 0.00 Canceled place d'infrastructure pour priority fisheries International Envelope 01 15 29 18 30 27 centre de recherche CEDP management MG-MRHP-28632-CW- Component 2. RFB//MG-PM-104 / Pending Strengthening capacities for Single Stage - Two 2019-07- 2019-07- 2019-08- 2019-12- 2020-01- 2020-07- Construction des bureaux IDA / 59870 Post Request for Bids Open - National 60,000.00 0.00 Implementa priority fisheries Envelope 01 15 29 03 14 12 des 2 PIE de l'ASH en tion management province : Antsiranana et Morondava MG-MRHP-119316-CW-RFB Component 2. / Construction bureaux USTA Strengthening capacities for Single Stage - One 2019-08- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- IDA / 59870 Post Request for Bids Open - National 46,000.00 0.00 Canceled au niveau des antennes priority fisheries Envelope 01 06 17 17 21 19 (Mahajanga et Toamasina) : management 02 MG-MRHP-96947-CW-RFQ BIS / Carénages du navire de Component 2. surveillance «Atsantsa », Strengthening capacities for Request for Single Stage - One 2019-07- 2019-02- 2019-09- 2019-07- 2020-03- remplacement des appareils IDA / D1720 Post Limited 350,000.00 309,641.94 Completed priority fisheries Quotations Envelope 07 11 26 12 24 de navigation/accessoires et management pièces de rechanges des moteurs auxiliaires MG-MRHP-119317-CW-RFB Component 2. / Constructions pour les six Strengthening capacities for Single Stage - One 2019-07- 2019-07- 2019-08- 2019-09- 2019-11- 2020-05- IDA / 59870 Post Request for Bids Open - National 420,000.00 0.00 Canceled (06) DRRHP et huit (08) priority fisheries Envelope 15 20 31 30 04 02 CIRRHP management MG-MRHP-28643-CW- Component 3. RFB//MG-PM-108 / Strengthening capacities for Single Stage - Two 2019-08- 2019-08- 2019-09- 2019-12- 2020-01- 2020-07- IDA / 59870 Post Request for Bids Open - National 350,000.00 0.00 Canceled Construction de petites engaging in alternative Envelope 01 15 29 19 30 28 débarcadères type ponton fishing practices and livelihoods activities MG-MRHP-119318-CW-RFB / Travaux de construction et Component 2. de la réhabilitation de Strengthening capacities for Single Stage - One 2019-07- 2019-06- 2019-07- 2019-08- 2019-07- 2020-02- 2020-06- 2020-03- 2020-08- 2021-08- IDA / 59870 Post Request for Bids Open - National 130,900.00 126,080.50 Signed l’ancien bureau-logement du priority fisheries Envelope 15 18 20 31 23 22 09 28 19 25 DRRHP Analanjorofo – management Region Analanjorofo MG-MRHP-119318BIS1-CW- Component 2. RFB / Travaux de Under Strengthening capacities for Single Stage - One 2019-07- 2019-06- 2019-07- 2019-08- 2019-07- 2020-02- 2020-03- 2021-08- construction d'un nouveau IDA / 59870 Post Request for Bids Open - National 58,400.00 0.00 Implementa priority fisheries Envelope 15 18 20 31 24 22 28 25 bureau-logement du DRRHP tion management Anosy - Région Anosy MG-MRHP-119318BIS2-CW- Component 2. RFB / Travaux de Under Strengthening capacities for Single Stage - One 2019-07- 2019-06- 2019-07- 2019-08- 2019-07- 2020-02- 2020-06- 2020-03- 2021-08- réhabilitation du bureau de IDA / 59870 Post Request for Bids Open - National 62,700.00 0.00 Implementa priority fisheries Envelope 15 18 20 31 24 22 09 28 25 la CIRRHP Maroantsetra- tion management District Maroantsetra MG-MRHP-119318BIS4-CW- Component 2. RFB / Travaux de Pending Strengthening capacities for Single Stage - One 2019-07- 2019-07- 2019-08- 2020-02- 2020-03- 2021-08- construction d'un nouveau IDA / 59870 Post Request for Bids Open - National 58,600.00 0.00 Implementa priority fisheries Envelope 15 20 31 22 28 25 bureau-logement ASH tion management Morondava - Région Menabe MG-MRHP-28645-CW- Component 3. RFB//MG-PM-109 / Strengthening capacities for Pending Single Stage - Two 2020-10- 2020-10- 2020-12- 2021-02- 2021-04- 2021-10- Construction IDA / 59870 engaging in alternative Post Request for Bids Open - National 600,000.00 0.00 Implementa Envelope 09 23 07 26 09 06 d'infrastructures fishing practices and tion communautaires livelihoods activities /communales : 60 MG-MRHP-127600-CW-RFB Component 2. Pending / Renforcement du CDA - Strengthening capacities for Single Stage - One 2020-08- 2020-09- 2020-11- 2020-12- 2021-01- 2021-07- IDA / 59870 Post Request for Bids Open - National 36,850.00 0.00 Implementa Construction puits et priority fisheries Envelope 31 21 02 02 06 05 tion réhabilitation clôture CDA management MG-MRHP-127603-CW-RFB Component 2. Pending / Construction du siège de Strengthening capacities for Single Stage - One 2020-09- 2020-10- 2020-11- 2020-12- 2021-01- 2021-07- IDA / 59870 Post Request for Bids Open - National 60,000.00 0.00 Implementa l'ASH centrale sis à priority fisheries Envelope 15 06 17 17 21 20 tion Antananarivo management MG-MRHP-119320-CW-RFB Component 3. Pending / Construction de marchés Strengthening capacities for Single Stage - One 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- 2021-05- IDA / 59870 Post Request for Bids Open - National 300,000.00 0.00 Implementa couverts aux produits engaging in alternative Envelope 07 12 23 23 27 26 tion halieutiques : 10 fishing practices and livelihoods activities MG-MRHP-28640-CW- Component 2. RFB//MG-PM-106 / Strengthening capacities for Single Stage - Two 2018-06- 2018-06- 2018-08- 2018-11- 2018-12- 2019-06- Constructions pour les six ( IDA / 59870 Post Request for Bids Open - National 180,000.00 0.00 Canceled priority fisheries Envelope 15 29 13 02 14 12 06) DRRHP et huit (08 management )CIRRHP MG-MRHP-170956-CW-DIR Component 2. / Travaux de construction du Strengthening capacities for 2020-05- 2020-06- 2020-05- 2020-06- 2020-07- 2020-09- 2021-12- IDA / 59870 Post Direct Selection Direct 76,500.00 95,680.97 Signed DRRHP Androy - Région priority fisheries 08 11 22 12 10 21 07 Androy management MG-MRHP-170965-CW-DIR Component 2. Under / Travaux de réhabilitation Strengthening capacities for 2020-05- 2020-06- 2020-05- 2020-06- 2020-07- 2021-12- IDA / 59870 Post Direct Selection Direct 71,000.00 0.00 Implementa du bureau-logement du priority fisheries 08 11 22 12 17 14 tion DRRHP Melaky - Région management Melaky MG-MRHP-119318BIS5-CW- Component 2. RFB / Travaux de Strengthening capacities for Single Stage - One 2019-07- 2019-06- 2019-07- 2019-08- 2019-07- 2020-02- 2020-04- 2020-03- 2021-08- réhabilitation du bureau- IDA / 59870 Post Request for Bids Open - National 71,000.00 0.00 Canceled priority fisheries Envelope 15 18 20 31 26 22 21 28 25 logement du DRRHP Melaky management - Région Melaky MG-MRHP-119318BIS3-CW- Component 2. RFB / Travaux de Strengthening capacities for Single Stage - One 2019-07- 2019-06- 2019-07- 2019-08- 2019-07- 2020-02- 2020-04- 2020-03- 2021-08- IDA / 59870 Post Request for Bids Open - National 76,500.00 0.00 Canceled construction du DRRHP priority fisheries Envelope 15 18 20 31 25 22 21 28 25 Androy - Région Androy management Page 1 MG-MRHP-28165-CW-RFB- Component 4. Project BIS // MG-PM-13 / Single Stage - One 2019-06- 2019-06- 2019-07- 2019-08- 2019-07- 2019-09- 2019-12- 2019-10- 2020-01- 2021-03- IDA / 59870 management and Post Request for Bids Open - National 90,375.00 74,306.94 Signed Construction de bureau de Envelope 17 17 08 19 23 18 17 23 17 21 coordination l'UGP centrale MG-MRHP-28165-CW- Component 4. Project RFB//MG-PM-13 / Single Stage - Two 2019-07- 2019-06- 2019-07- 2019-07- 2019-09- 2019-07- 2019-11- 2020-01- 2020-07- IDA / 59870 management and Post Request for Bids Open - National 60,000.00 0.00 Canceled Construction de bureau de Envelope 01 17 22 18 05 23 25 06 04 coordination l'UGP centrale MG-MRHP-203600-CW-RFB Component 2. / Travaux de construction Under Strengthening capacities for Single Stage - One 2020-11- 2020-12- 2020-12- 2020-12- 2021-01- 2021-01- 2021-02- 2021-03- 2021-07- d'un bureau de IDA / 59870 Post Request for Bids Open - National 61,500.00 0.00 Implementa priority fisheries Envelope 20 09 10 12 09 08 08 15 13 Circonscription de tion management l'Agriculture, de l'Elevage et de la Pêche ( CirAEP) à Ambanja MG-MRHP-119321-CW-RFB / Construction de hangars avec des matériaux locaux Component 3. pour entretenir les moteurs, Strengthening capacities for Pending les embarcations et des Single Stage - One 2021-08- 2021-08- 2021-09- 2021-10- 2021-11- 2022-05- IDA / 59870 engaging in alternative Post Request for Bids Open - National 240,000.00 0.00 Implementa engins de pêche autorisés et Envelope 06 11 22 22 26 25 fishing practices and tion d'une base de réunion, livelihoods activities sensibilisation et de structuration des utilisateurs petites infrastructures de pêche : 08 MG-MRHP-119319-CW-RFB / Installation d'unités de fabriques de glace/chambres Component 3. froides fonctionnant avec Strengthening capacities for Pending des énergies renouvelables Single Stage - One 2021-09- 2021-09- 2021-10- 2021-11- 2021-12- 2022-06- IDA / 59870 engaging in alternative Post Request for Bids Open - National 320,000.00 0.00 Implementa et respectant Envelope 10 15 27 26 31 29 fishing practices and tion l’environnement pour livelihoods activities maintenir la chaîne de froid des produits halieutiques dès leur débarquement : 04 MG-MRHP-119324-CW-RFB Component 3. / Infrastructures Strengthening capacities for Pending Single Stage - One 2021-08- 2021-08- 2021-09- 2021-10- 2021-11- 2022-05- d'électrification hors grille TF / A4588 engaging in alternative Post Request for Bids Open - National 300,000.00 0.00 Implementa Envelope 02 07 18 18 22 21 dans les communautés fishing practices and tion pilotes : 10 livelihoods activities GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MRHP-28121-GO-UN// Component 2. MG-PM-01 / Matériels et Strengthening capacities for UN Agencies 2017-09- 2017-10- 2017-12- 2018-06- IDA / 59870 Post Direct 315,310.00 0.00 Canceled équipements informatiques priority fisheries (Direct) 30 21 23 21 et bureautiques management MG-MRHP-28129-GO- RFB//MG-PM-02 / Kits Component 2. d'équipements pour les Strengthening capacities for Open - Single Stage - Two 2017-10- 2017-11- 2017-12- 2018-03- 2018-04- 2018-10- IDA / D1720 Post Request for Bids 17,500.00 0.00 Canceled enquêteurs (sac de priority fisheries International Envelope 15 05 17 08 19 16 couchage, tente, torche, management bottes, impermeable) MG-MRHP-28136-GO- Component 2. Pending UN Agencies 2017-09- 2017-10- 2017-12- 2018-06- UN//MG-PM-03 / IDA / 59870 Strengthening capacities for Post Direct 1,830,000.00 0.00 Implementat (Direct) 30 21 23 21 Acquisition de Véhicule priority fisheries ion management MG-MRHP-28157-GO- Component 2. RFB//MG-PM-05 / Strengthening capacities for Open - Single Stage - Two 2017-10- 2017-11- 2018-01- 2018-03- 2018-05- 2018-11- IDA / 59870 Post Request for Bids 29,170.00 0.00 Canceled Acquisition de fournitures et priority fisheries International Envelope 30 20 04 26 07 03 articles de bureau management MG-MRHP-28158-GO- Component 2. Pending UN Agencies 2017-09- 2017-10- 2017-12- 2018-06- UN//MG-PM-06 / IDA / 59870 Strengthening capacities for Post Direct 59,000.00 0.00 Implementat (Direct) 30 21 23 21 Acquisition de Moto priority fisheries ion management MG-MRHP-28159-GO- Component 2. UN//MG-PM-07 / Strengthening capacities for UN Agencies 2017-10- 2017-11- 2018-01- 2018-07- IDA / D1720 Post Direct 5,000.00 0.00 Canceled Acquisition de Drone pour priority fisheries (Direct) 16 06 08 07 surveillance et contrôle management MG-MRHP-28160-GO- Component 2. RFB//MG-PM-08 / Strengthening capacities for Open - Single Stage - Two 2017-10- 2017-11- 2018-01- 2018-03- 2018-05- 2018-11- IDA / 59870 Post Request for Bids 120,000.00 0.00 Canceled Acquisition de Matériels et priority fisheries International Envelope 30 20 04 26 07 03 Mobiliers de bureau management MG-MRHP-28161-GO- RFB//MG-PM-09 / Appui à la Component 3. mise à disposition des Strengthening capacities for équipements de base pour la Open - Single Stage - Two 2017-11- 2017-12- 2018-01- 2018-04- 2018-05- 2018-11- IDA / 59870 engaging in alternative Post Request for Bids 65,000.00 0.00 Canceled sécurité des pêcheurs et de International Envelope 15 06 20 11 23 19 fishing practices and leurs embarcations en mer livelihoods activities (gilet, miroir... pour la période transitoire) MG-MRHP-28162-GO- Component 2. RFB//MG-PM-10 / Strengthening capacities for Single Stage - One 2017-11- 2017-12- 2018-01- 2018-02- 2018-04- 2018-09- IDA / 59870 Post Request for Bids Open - National 25,170.00 0.00 Canceled Acquisition de priority fisheries Envelope 15 06 20 19 02 29 Consommables management informatiques (Lot) MG-MRHP-28397-GO- Component 2. RFB//MG-MP-89 / Strengthening capacities for Open - Single Stage - Two 2018-06- 2018-06- 2018-08- 2018-11- 2018-12- 2019-06- Acquisition et installation IDA / D1720 Post Request for Bids 150,000.00 0.00 Canceled priority fisheries International Envelope 15 29 13 02 14 12 d'un logiciel de suivi management automatique des captures (ERS) MG-MRHP-28401-GO- Component 3. RFB//MG-PM-90 / Matériels Strengthening capacities for de bureau du CFTP (06 lots Open - Single Stage - Two 2018-06- 2018-06- 2018-08- 2018-11- 2018-12- 2019-06- IDA / 59870 engaging in alternative Post Request for Bids 6,000.00 0.00 Canceled composés de table de International Envelope 15 29 13 02 14 12 fishing practices and bureau, chaise de bureau, livelihoods activities chaise visiteuse et armoire ) MG-MRHP-28406-GO- RFB//MG-PM-93 / Component 3. Acquisition des équipements Strengthening capacities for Open - Single Stage - Two 2018-01- 2018-02- 2018-03- 2018-06- 2018-07- 2019-01- de base pour la sécurité des IDA / 59870 engaging in alternative Post Request for Bids 100,000.00 0.00 Canceled International Envelope 30 13 30 19 31 27 pêcheurs et de leurs fishing practices and embarcations en mer (gilet, livelihoods activities miroir... pour la période transitoire) MG-MRHP-28415-GO- Component 3. RFB//MG-PM-96 / Strengthening capacities for Single Stage - Two 2018-03- 2018-04- 2018-05- 2018-08- 2018-09- 2019-03- Acquisition d'outillage pour IDA / 59870 engaging in alternative Post Request for Bids Open - National 19,000.00 0.00 Canceled Envelope 30 13 28 17 28 27 les pépinières et les fishing practices and reboisements (brouette,....) livelihoods activities MG-MRHP-28431-GO- RFB//MG-PM-100 / Acquisition de mobiliers de Component 3. bureau pour Gestion et mise Strengthening capacities for en œuvre : (03 lots Single Stage - Two 2018-05- 2018-05- 2018-07- 2018-10- 2018-11- 2019-05- IDA / V0500 engaging in alternative Post Request for Bids Open - National 40,000.00 0.00 Canceled composés de 01 table de Envelope 15 29 13 02 13 12 fishing practices and bureau, 01 chaise de bureau, livelihoods activities 02 chaises visiteurs et 01 armoire de rangement semi vitré ) MG-MRHP-23399-GO-UN / Component 2. UN Agencies 2017-08- 2017-09- 2017-11- 2018-05- Achat de lot de Matériel IDA / Q9790 Strengthening capacities for Post Direct 201,660.00 0.00 Canceled (Direct) 15 05 07 06 informatique (Année 2017) priority fisheries management Component 3. MG-MRHP-85764-GO-RFQ Strengthening capacities for Request for Single Stage - One 2018-12- 2019-04- 2019-10- // MG-PM 18/18 / Achat de IDA / 59870 Post Limited 3,950.00 0.00 Canceled engaging in alternative Quotations Envelope 15 14 11 79 boites à plaintes fishing practices and livelihoods activities MG-MRHP-28404-GO- Component 3. RFB//MG-PM-91 / Strengthening capacities for Open - Single Stage - Two 2019-07- 2019-07- 2019-09- 2019-12- 2020-01- 2020-07- IDA / 59870 Post Request for Bids 320,000.00 0.00 Canceled Acquisition d'équipements et engaging in alternative International Envelope 16 30 13 03 14 12 outils de pêche fishing practices and livelihoods activities MG-MRHP-28405-GO- Component 3. RFB//MG-PM-92 / Strengthening capacities for Open - Single Stage - Two 2019-07- 2019-07- 2019-08- 2019-11- 2019-12- 2020-06- Acquisition d'outillage IDA / 59870 engaging in alternative Post Request for Bids 185,000.00 0.00 Canceled International Envelope 01 15 29 18 30 27 d'entretien d'engin et fishing practices and d'embarcation de pêche pour livelihoods activities usage communautaire MG-MRHP-119305-GO-RFQ Component 3. / Appui à l'acquisition de Strengthening capacities for Request for Single Stage - One 2019-07- 2019-08- 2020-02- matériels de sécurité aux IDA / 59870 engaging in alternative Post Limited 100,000.00 0.00 Canceled Quotations Envelope 06 31 27 pêcheurs et communauté de fishing practices and pêcheurs : 2000 livelihoods activities MG-MRHP-28410-GO- Component 3. RFB//MG-PM-94 / Strengthening capacities for Open - Single Stage - Two 2018-05- 2018-05- 2018-07- 2018-10- 2018-11- 2019-05- IDA / 59870 Post Request for Bids 80,000.00 0.00 Canceled Acquisition d'outils de engaging in alternative International Envelope 15 29 13 02 13 12 valorisation fishing practices and livelihoods activities MG-MRHP-28411-GO- Component 3. RFB//MG-PM-95 / Strengthening capacities for Open - Single Stage - Two 2019-07- 2019-07- 2019-08- 2019-11- 2019-12- 2020-06- IDA / 59870 Post Request for Bids 80,000.00 0.00 Canceled Acquisition des petits engaging in alternative International Envelope 01 15 29 18 30 27 matériels de valorisation fishing practices and livelihoods activities Component 3. MG-MRHP-119309-GO-RFQ Strengthening capacities for Request for Single Stage - One 2019-06- 2019-08- 2019-07- 2020-02- 2019-08- / Achat boites à plaintes : IDA / 59870 Post Open - National 5,250.00 7,885.75 Completed engaging in alternative Quotations Envelope 23 18 16 14 14 105 fishing practices and livelihoods activities Page 2 Component 3. MG-MRHP-119311-GO-RFQ Strengthening capacities for Request for Single Stage - One 2019-07- 2019-10- 2019-09- 2020-01- 2020-03- 2020-01- / Achat puce et téléphone IDA / 59870 Post Limited 5,250.00 11,213.00 Completed engaging in alternative Quotations Envelope 20 09 14 10 12 31 portable : 105 fishing practices and livelihoods activities MG-MRHP-28121-GO-UN// Component 2. Request for Single Stage - One 2019-07- 2019-09- 2019-08- 2019-10- 2019-10- 2019-11- 2019-11- 2020-04- 2019-12- 2020-06- 2020-06- MG-PM-01-2 / Matériels IDA / 59870 Strengthening capacities for Post Open - National 156,370.00 141,053.48 Signed Proposals Envelope 31 14 21 09 02 08 01 15 13 10 10 informatiques 2019 priority fisheries management MG-MRHP-86177-GO- Component 2. RFQ//MG-PM 08/18 / Achat Strengthening capacities for Request for Single Stage - One 2019-08- 2019-07- 2020-01- 2019-09- 2020-07- 2019-09- téléphone mobile pour la IDA / V0500 Post Limited 10,500.00 10,073.72 Completed priority fisheries Quotations Envelope 24 24 06 04 04 25 collecte de données au management niveau national MG-MRHP-28160-GO- Component 2. RFB//MG-PM-08-2 / Strengthening capacities for Request for Single Stage - One 2019-07- 2019-08- 2019-09- 2019-09- 2020-03- 2019-09- IDA / 59870 Post Limited 33,200.00 19,057.68 Completed Matériels et mobiliers de priority fisheries Quotations Envelope 20 29 14 04 12 09 bureau 2019 management MG-MRHP-28161-GO- RFB//MG-PM-09-2 / Appui Component 3. à la mise à disposition des Strengthening capacities for équipements de base pour la Single Stage - One 2019-07- 2019-09- 2019-07- 2019-10- 2019-08- 2019-11- 2019-09- 2019-12- 2019-11- 2020-05- IDA / 59870 engaging in alternative Post Request for Bids Open - National 330,000.00 0.00 Canceled sécurité des pêcheurs et de Envelope 15 16 20 09 31 08 30 13 04 02 fishing practices and leurs embarcations en mer livelihoods activities (gilet, miroir… pour la période transitoire) : 3300 MG-MRHP-28161 BIS-GO- Component 3. RFB // MG-PM-09-2 / Strengthening capacities for Acquisition de 3300 kits de Single Stage - One 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-02- 2020-04- 2020-03- 2020-04- 2020-06- IDA / 59870 engaging in alternative Post Request for Bids Open - National 330,000.00 106,992.01 Signed sécurité en mer pour les Envelope 20 31 27 31 26 31 16 07 04 27 02 fishing practices and petits pêcheurs (gilet, livelihoods activities miroir… pour la période transitoire) MG-MRHP-160447-GO-RFQ Component 2. / Fourniture des plaques Pending Strengthening capacities for Request for Single Stage - One 2020-03- 2020-04- 2020-05- d'immatriculations des IDA / 59870 Post Limited 100,000.00 0.00 Implementat priority fisheries Quotations Envelope 11 15 15 pirogues (lot unique et ion management indivisible) MG-MRHP-161268-GO-RFQ Component 2. / Fourniture des carnets Strengthening capacities for Request for Single Stage - One 2020-02- 2020-02- 2020-03- 2020-03- 2020-03- IDA / 59870 Post Limited 8,400.00 8,166.14 Signed d'expédition des produits priority fisheries Quotations Envelope 27 18 06 04 13 halieutiques management MG-MRHP-127597-GO-RFQ Component 2. Pending Request for Single Stage - One 2020-09- 2020-12- 2021-06- / 200 équipements et outils IDA / 59870 Strengthening capacities for Post Limited 40,000.00 0.00 Implementat Quotations Envelope 11 11 09 de pêches priority fisheries ion management MG-MRHP-119303-GO-RFQ Component 2. Pending / Dotation et moyens Strengthening capacities for Request for Single Stage - One 2020-08- 2020-10- 2021-04- TF / A4588 Post Limited 48,000.00 0.00 Implementat d'équipement pour les priority fisheries Quotations Envelope 08 03 01 ion membres du CSC : 24 management MG-MRHP-119315-GO-RFQ Component 3. Pending / Renforcement de l'unité de Strengthening capacities for Request for Single Stage - One 2020-09- 2020-11- 2021-04- IDA / 59870 Post Limited 55,000.00 0.00 Implementat gestion communautaire en engaging in alternative Quotations Envelope 06 01 30 ion biens et équipements : 22 fishing practices and livelihoods activities MG-MRHP-119304-GO-RFQ Component 2. Pending Request for Single Stage - One 2020-08- 2020-09- 2021-03- / Matériels de l'électrification IDA / 59870 Strengthening capacities for Post Limited 9,000.00 0.00 Implementat Quotations Envelope 04 29 28 hors grille : 03 priority fisheries ion management MG-MRHP-119300BIS-GO- Component 2. Pending Request for Single Stage - One 2019-06- 2019-08- 2020-02- RFQ / Acquisition d'une TF / A4588 Strengthening capacities for Post Limited 100,000.00 0.00 Implementat Quotations Envelope 08 26 22 Vedette pour appui CSP priority fisheries ion management Component 3. MG-MRHP-85764 BIS-GO- Strengthening capacities for Request for Single Stage - One 2020-05- 2020-05- 2020-07- 2020-06- 2020-08- RFQ / Achat de 155 boites à IDA / 59870 Post Limited 12,000.00 11,910.86 Signed engaging in alternative Quotations Envelope 13 08 08 09 07 plaintes pour l'exercice 2020 fishing practices and livelihoods activities MG-MRHP-174399-GO-RFQ Component 3. / Acquisition de 160 Strengthening capacities for Under téléphones mobiles pour le Request for Single Stage - One 2020-05- 2020-06- 2020-07- 2020-08- IDA / 59870 engaging in alternative Post Limited 15,000.00 0.00 Implementat Mécanisme De Gestion des Quotations Envelope 31 03 26 25 fishing practices and ion Plaintes (MDGP) / Exercice livelihoods activities 2020 MG-MRHP-119314-GO-RFQ Component 3. / Achat de vedette pour la Strengthening capacities for Request for Single Stage - One 2020-07- 2020-09- 2021-03- IDA / 59870 Post Limited 80,000.00 0.00 Canceled mise en œuvre des activités engaging in alternative Quotations Envelope 20 14 13 dans la région Melaky :1 fishing practices and livelihoods activities MG-MRHP-119300-GO-RFB / Acquisition de Cinq (05) Vedettes pour CSP réparties en deux (02) lots: Component 2. - Lot 01: Acquisition de 03 Strengthening capacities for Single Stage - One 2020-04- 2020-04- 2020-06- 2020-07- 2020-08- 2021-02- Vedettes pour appuyer le TF / A4588 Post Request for Bids Open - National 321,500.00 0.00 Canceled priority fisheries Envelope 15 20 01 01 05 01 CSP pour les nouvelles management antennes au niveau des ZUP; - Lot 02: Acquisition de 02 vedettes rapides semi- rigides pour patrouilleurs MG-MRHP-119300BIS1-GO- RFB / Acquisition des Component 2. vedettes réparties en 02 Lots Under Strengthening capacities for Single Stage - One 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-08- 2020-09- 2020-12- : IDA / 59870 Post Request for Bids Open - National 551,500.00 0.00 Implementat priority fisheries Envelope 15 12 16 19 16 15 19 18 • Lot1 : 07 vedettes ion management coques rigides ; • Lot2 : 02 vedettes rapides semi-rigides. MG-MRHP-28415-GO-RFB Component 3. // MG-PM-96 BIS / Outillage Strengthening capacities for Request for Single Stage - One 2020-04- 2020-06- 2020-12- pour les pépinières et les IDA / 59870 engaging in alternative Post Limited 19,000.00 0.00 Canceled Quotations Envelope 20 15 12 reboisements (brouette,….) : fishing practices and 19 livelihoods activities MG-MRHP-14629-GO- Component 2. Pending RFQ// PA 2 / PA2: Strengthening capacities for Request for Single Stage - One 2020-09- 2020-11- 2020-12- IDA / Q9790 Post Limited 11,000.00 0.00 Implementat Acquisition d'un lot de priority fisheries Quotations Envelope 29 17 17 ion matériels de formation et management d'enquête MG-MRHP-127590-GO-RFQ Component 2. / Acquisition de 2 motos Pending Strengthening capacities for Request for Single Stage - One 2020-09- 2020-11- 2021-05- pour les 2 antennes IDA / 59870 Post Limited 8,000.00 0.00 Implementat priority fisheries Quotations Envelope 20 15 14 régionales de l'USTA ion management (Mahajanga et Toamasina) MG-MRHP-119240-GO-RFB Component 2. / Renforcement du Centre de Strengthening capacities for Single Stage - Two 2020-07- 2020-08- 2020-09- 2020-11- 2021-01- 2021-07- Développement de IDA / 59870 Post Request for Bids Open - National 580,000.00 0.00 Canceled priority fisheries Envelope 30 04 15 28 02 01 l'Aquaculture (CDA) - management Equipement derecherche MG-MRHP-188316-GO-RFB Component 3. / Fourniture et livraison de Strengthening capacities for Open - Single Stage - One 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-10- 2020-10- 2020-11- 2020-11- 2021-01- 2021-01- IDA / 59870 Post Request for Bids 1,170,000.00 432,020.22 Signed 11.700 lots d'équipements engaging in alternative International Envelope 14 26 15 26 29 20 14 13 11 18 10 de base pour la sécurité en fishing practices and mer livelihoods activities MG-MRHP-28421-GO- Component 3. Pending RFB//MG-PM-99 / Strengthening capacities for Single Stage - One 2020-09- 2020-09- 2020-11- 2020-12- 2021-01- 2021-07- IDA / V0500 Post Request for Bids Open - National 500,000.00 0.00 Implementat Acquisition des kits de engaging in alternative Envelope 17 22 03 03 07 06 ion panneaux solaires fishing practices and livelihoods activities MG-MRHP-192172-GO-RFQ / Achat de 15.000 Caches Component 4. Project Request for Single Stage - One 2020-09- 2020-11- 2021-05- bouche avec logo SWIOFish2 IDA / 59870 management and Post Limited 11,500.00 0.00 Canceled Quotations Envelope 22 17 16 pour les trois (03) UGL's et coordination l'UGP du projet SWIOFish2 MG-MRHP-119300 RELANCE-GO-RFB / Component 2. Under Acquisition des vedettes Strengthening capacities for Single Stage - One 2021-01- 2021-02- 2021-01- 2021-02- 2021-03- 2021-03- 2021-04- 2021-05- 2021-05- 2021-11- IDA / 59870 Post Request for Bids Limited 551,500.00 0.00 Implementat réparties en 02 Lots : • Lot1 priority fisheries Envelope 19 15 24 16 07 22 06 05 11 07 ion : 07 vedettes coques rigides management ; • Lot2 : 02 vedettes rapides semi-rigides. MG-MRHP-218714-GO-RFB Component 2. Under Single Stage - One 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-05- 2021-06- 2021-08- / Acquisition des matériels IDA / 59870 Strengthening capacities for Post Request for Bids Open - National 316,100.00 0.00 Implementat Envelope 01 30 06 06 05 05 09 23 informatiques 2020 et 2021 priority fisheries ion management MG-MRHP-119306-GO-RFQ Component 3. / Appui en biens et Strengthening capacities for Pending équipements des Request for Single Stage - One 2021-03- 2021-05- 2021-11- IDA / 59870 engaging in alternative Post Limited 6,400.00 0.00 Implementat groupements formels: 32/ Quotations Envelope 14 09 05 fishing practices and ion répartis en 2 Lots: Lot 1: livelihoods activities Glacières; Lot 2: Couteaux MG-MRHP-119299-GO-RFQ Component 2. Pending / Matériels Strengthening capacities for Request for Single Stage - One 2021-03- 2021-05- 2021-11- IDA / 59870 Post Limited 1,500.00 0.00 Implementat d'échantillonnages (Blouse, priority fisheries Quotations Envelope 10 05 01 ion gant, balance, pied a management coulisse…) : 03 MG-MRHP-119295-GO-RFQ Component 2. Pending Request for Single Stage - One 2021-03- 2021-05- 2021-11- / Achat de Lot IDA / 59870 Strengthening capacities for Post Limited 10,000.00 0.00 Implementat Quotations Envelope 15 10 06 d'équipements pour priority fisheries ion laboratoire USTA management MG-MRHP-203606-GO-RFQ Component 2. Pending / Acquisitions des Strengthening capacities for Request for Single Stage - One 2021-03- 2021-05- 2021-07- IDA / 59870 Post Open - National 19,200.00 0.00 Implementat téléphones mobiles pour priority fisheries Quotations Envelope 20 29 13 ion l'UGP- SRPA et RPA management Page 3 MG-MRHP-222323-GO-RFQ Component 2. / Acquisition d'une vedette Pending Strengthening capacities for Request for Single Stage - One 2021-04- 2021-06- 2021-09- et des autres équipements IDA / 59870 Post Limited 45,000.00 0.00 Implementat priority fisheries Quotations Envelope 05 23 06 pour la prospections de ion management nouvelle zone de pêche MG-MRHP-216847-GO-RFB Component 3. / Achat, installation et Strengthening capacities for Under Open - Single Stage - One 2021-04- 2021-03- 2021-04- 2021-03- 2021-06- 2021-06- 2021-07- 2022-01- maintenance d'équipements IDA / 59870 engaging in alternative Post Request for Bids 1,615,000.00 0.00 Implementat International Envelope 15 30 20 31 04 25 30 26 photovoltaïque pour 20 fishing practices and ion kiosques multiservices livelihoods activities MG-MRHP-224078-GO-RFB Component 3. / Achat, installation et Strengthening capacities for Under Open - Single Stage - One 2021-04- 2021-03- 2021-04- 2021-03- 2021-06- 2021-07- 2021-08- 2022-02- maintenance d'équipements IDA / 59870 engaging in alternative Post Request for Bids 990,300.00 0.00 Implementat International Envelope 15 30 20 31 04 04 08 04 frigorifiques et de glace pour fishing practices and ion 20 kiosques multiservices livelihoods activities MG-MRHP-227238-GO-RFB Component 3. / Fourniture et livraison des Strengthening capacities for Under Open - Single Stage - One 2021-05- 2021-05- 2021-05- 2021-05- 2021-07- 2021-07- 2021-09- 2022-03- équipements de base pour la IDA / 59870 engaging in alternative Post Request for Bids 1,200,000.00 0.00 Implementat International Envelope 15 17 20 18 01 31 04 03 sécurité en mer pour l'année fishing practices and ion 2021 et 2022 livelihoods activities MG-MRHP-231589-GO-RFQ Component 2. Pending / Acquisition de 20 tablettes Strengthening capacities for Request for Single Stage - One 2021-06- 2021-07- 2021-08- IDA / V0500 Post Open - National 37,000.00 0.00 Implementat marinisées pour le Centre de priority fisheries Quotations Envelope 05 31 30 ion Surveillance de Pêche management MG-MRHP-231608-GO-RFB Component 2. Pending / Matériels et équipements Strengthening capacities for Open - Single Stage - One 2021-05- 2021-05- 2021-06- 2021-07- 2021-09- 2022-03- IDA / V0500 Post Request for Bids 680,000.00 0.00 Implementat pour laboratoire CEDP-CDA priority fisheries International Envelope 14 19 30 30 03 02 ion et USTA management MG-MRHP-119240 BIS-GO- Component 2. RFB / Renforcement du Strengthening capacities for Single Stage - One 2021-03- 2021-03- 2021-04- 2021-05- 2021-07- 2021-10- Centre de Développement de IDA / 59870 Post Request for Bids Open - National 580,000.00 0.00 Canceled priority fisheries Envelope 26 31 30 30 04 02 l'Aquaculture (CDA) - management Equipement de recherche MG-MRHP-28156-GO-UN//- Component 2. MG-PM-04 / Matériels et Strengthening capacities for UN Agencies 2020-11- 2020-11- 2021-01- 2021-07- IDA / 59870 Post Direct 50,000.00 0.00 Canceled équipements pour priority fisheries (Direct) 02 23 25 24 laboratoire CEDP management MG-MRHP-232523-GO-RFQ Component 2. Pending Request for Single Stage - One 2021-05- 2021-07- 2021-10- / Acquisition d'une vedette IDA / 59870 Strengthening capacities for Post Limited 73,000.00 0.00 Implementat Quotations Envelope 25 20 03 frigorifique CDPHM priority fisheries ion management MG-MRHP-231602-GO-RFQ Component 2. Pending / Acquisition de Drones Strengthening capacities for Request for Single Stage - One 2021-05- 2021-07- 2022-01- IDA / D1720 Post Limited 26,000.00 0.00 Implementat pour CSC, formation et priority fisheries Quotations Envelope 25 20 16 ion service après vente management MG-MRHP-232525-GO-RFQ / Acquisition des matériels Component 2. Pending roulants ( 02 camions Strengthening capacities for Request for Single Stage - One 2021-05- 2021-07- 2021-10- IDA / 59870 Post Open - National 86,000.00 0.00 Implementat Frigorifiques de capacité 5 priority fisheries Quotations Envelope 26 21 19 ion tonnes) pour les sites du management CDPHM MG-MRHP-232534-GO-RFQ Component 4. Project Pending / Acquisition et installation Request for Single Stage - One 2021-05- 2021-07- 2022-01- IDA / Q9790 management and Post Open - National 50,000.00 0.00 Implementat d'un logiciel de suivi Quotations Envelope 25 20 16 coordination ion évaluation NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MRHP-151759-NC-RFB Component 2. Under / Analyse PC de l'eau de Strengthening capacities for Open - Single Stage - One 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-03- 2020-02- 2020-03- 2020-05- IDA / 59870 Post Request for Bids 110,000.00 0.00 Implementat traitement ou de production priority fisheries International Envelope 06 29 11 29 25 16 26 22 21 ion (lot N°1) management MG-MRHP-151759BIS1-NC- Component 2. RFQ / Analyses officielles Pending Strengthening capacities for Request for Single Stage - One 2019-08- 2019-10- 2019-12- pour le compte de l'Autorité IDA / 59870 Post Limited 100,000.00 0.00 Implementat priority fisheries Quotations Envelope 10 28 27 Sanitaire Halieutique (ASH) ion management répartie en 9 Lots MG-MRHP-192432-NC-RFB / Analyses officielles relatives au contrôle de la qualité physico-chimique Component 2. des eaux de traitement et de Pending Strengthening capacities for Open - Single Stage - One 2020-09- 2020-09- 2020-11- 2020-12- 2021-01- 2021-04- production et des résidus IDA / 59870 Post Request for Bids 309,750.00 0.00 Implementat priority fisheries International Envelope 22 27 11 02 02 02 chimiques et contaminants ion management dans les produits de la pêche et d’aquaculture, conformément aux plans de surveillance nationaux 202 MG-MRHP-192435-NC-DIR / Analyses officielles relatives à la Recherche de Vibrio potentiellement Component 2. Pending entéropathogènes dans les Strengthening capacities for 2020-09- 2020-09- 2020-11- 2021-02- IDA / 59870 Post Direct Selection Direct 7,860.00 0.00 Implementat produits de la pêche et priority fisheries 22 27 25 23 ion d’aquaculture (crustacées : management crabes et crevettes), conformément aux plans de surveillance nationaux 2020 MG-MRHP-196025-NC-DIR Component 2. / Diagnostic des maladies Pending Strengthening capacities for 2020-10- 2020-10- 2020-11- 2020-12- des crustacés dans le cadre IDA / 59870 Post Direct Selection Direct 47,000.00 0.00 Implementat priority fisheries 09 30 26 11 de la réalisation du Plan de ion management Surveillance 2020 MG-MRHP-231600-NC-DIR Component 2. / Acquisition et installation Under Strengthening capacities for 2021-05- 2021-05- 2021-07- 2022-07- d'équipement des deux IDA / V0500 Post Direct Selection Direct 37,000.00 0.00 Implementat priority fisheries 20 25 14 14 Patrouilleurs (Atsantsa et ion management Telonify)   à bord des navires MG-MRHP-231592-NC-DIR / Extension de l’application Component 2. du système ERS du Centre de Under Strengthening capacities for 2021-05- 2021-05- 2021-07- 2022-07- Surveillance des Pêches de IDA / V0500 Post Direct Selection Direct 36,600.00 0.00 Implementat priority fisheries 20 25 14 14 Madagascar aux navires ion management nationaux et étrangers hors- UE CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MRHP-14498-CS- QCBS// PA-13 / PA 13: Mise Component 2. à jour de la Stratégie Strengthening capacities for Quality And Cost- Open - 2017-05- 2017-07- 2017-09- 2017-09- 2017-09- 2017-10- 2018-10- IDA / Q9790 Post 75,000.00 0.00 Canceled 2017-05-16 d'aquaculture et élaboration priority fisheries Based Selection International 30 28 11 13 22 20 20 de plan de développement management des 03 filières aquaculture MG-MRHP-14951-CS- LCS//PA65 / PA 65: Etudes techniques : - Clôture de l'enceinte Component 2. DRRHP Fénérive Strengthening capacities for Least Cost Open - Under 2017-12- 2017-05- 2017-07- 2018-03- 2017-08- 2017-08- 2017-09- 2018-05- 2017-10- 2018-04- - Construction des Bureaux IDA / Q9790 Post 35,000.00 0.00 2017-05-17 priority fisheries Selection International Implementation 19 31 22 19 21 28 11 07 09 07 de 06 DRRHP management - Extension de l'ASH à Antsiranana et Morondava - Construction local pour bureau UGP MG-MRHP-4769-CS-CQS / Component 2. Mise à jour de la Stratégie Consultant Strengthening capacities for Open - 2017-02- 2017-04- 2017-05- 2017-06- 2017-12- d'aquaculture et élaboration IDA / Q9790 Post Qualification 75,000.00 0.00 Canceled 2017-02-01 priority fisheries International 22 07 07 11 08 de plan de développement Selection management des 03 filières aquaculture MG-MRHP-4770-CS-CQS / Conception d'un système de Component 2. Consultant collecte de données pour les Strengthening capacities for Open - 2017-02- 2017-04- 2017-05- 2017-06- 2017-12- IDA / Q9790 Post Qualification 10,000.00 0.00 Canceled 2017-02-01 pêcheries traditionnelles, y priority fisheries International 22 07 07 11 08 Selection compris une stratégie management d'échantillonnage appropriée MG-MRHP-23760-CS- QCBS//MG-PM-117 / Recrutement d'un Cabinet Component 3. d'étude ou d'une ONG pour Strengthening capacities for Quality And Cost- 2017-10- 2017-10- 2018-08- 2017-12- 2018-09- 2018-01- 2019-02- 2018-02- 2019-07- 2018-03- 2019-08- 2018-05- 2019-09- 2020-04- assurer les missions de IDA / Q9790 engaging in alternative Prior Open - National 600,000.00 677,965.07 Signed 2017-09-14 Based Selection 30 05 29 10 18 07 07 06 08 20 16 01 24 30 l'AGEX pour l'appui à la mise fishing practices and en œuvre du Plan livelihoods activities d'Aménagement des Pêcheries de la Baie d'Antongil MG-MRHP-27282-CS- Component 2. QCBS//PA61 / Appui à la Strengthening capacities for Quality And Cost- Open - 2017-09- 2017-11- 2017-12- 2017-08- 2018-01- 2018-02- 2018-04- 2019-04- IDA / Q9790 Prior 500,000.00 0.00 Canceled 2017-09-07 mise en place des outils priority fisheries Based Selection International 28 26 24 04 23 27 03 03 d'aménagement des pêches management Page 4 MG-MRHP-28166-CS- Component 2. QCBS//MG-PM-14 / Recueil Strengthening capacities for Quality And Cost- Open - 2018-01- 2018-03- 2018-04- 2018-05- 2018-07- 2018-08- 2019-08- IDA / D1720 Post 25,000.00 0.00 Canceled 2017-12-15 et analyse des informations priority fisheries Based Selection International 05 12 09 24 05 16 16 de base avant-projet management MG-MRHP-28168-CS- Component 2. QCBS//MG-PM-16 / Collecte Strengthening capacities for Quality And Cost- Open - Pending 2018-01- 2018-03- 2018-04- 2018-05- 2018-07- 2018-08- 2019-08- IDA / D1720 Post 20,000.00 0.00 2017-12-15 des données au niveau des priority fisheries Based Selection International Implementation 05 12 09 24 05 16 16 régions prioritaires (Artfish) management MG-MRHP-28170-CS- CQS//MG-PM-18 / Identification des besoins en Component 2. formation et élaboration du Consultant Strengthening capacities for Open - 2018-01- 2018-03- 2018-04- 2018-05- 2018-11- plan de formation des agents IDA / 59870 Post Qualification 20,000.00 0.00 Canceled 2017-12-22 priority fisheries International 12 19 18 30 26 de l'administration (y Selection management compris Inventaire et contact des centres de formation locaux et extérieurs ) MG-MRHP-28171-CS- CQS//MG-PM-19 / Etude sur l'identification et recensement des Component 3. bénéficiaires chaque année, Strengthening capacities for Consultant Open - 2017-10- 2017-12- 2018-02- 2019-05- 2018-03- 2019-09- 2018-05- 2019-09- 2018-11- du montant et des modalités IDA / 59870 engaging in alternative Post Qualification 200,000.00 159,792.61 Signed 2017-11-15 International 24 06 10 31 27 06 08 18 04 de transfert financier, du fishing practices and Selection montant minimal de filet livelihoods activities social pour les pêcheurs/acteurs filières affectés par les mesures de gestion MG-MRHP-28174-CS- Component 3. CQS//MG-PM-22 / Étude sur Strengthening capacities for Consultant Open - 2019-06- 2017-12- 2018-02- 2018-04- 2018-05- 2018-11- le circuit de IDA / 59870 engaging in alternative Post Qualification 90,000.00 0.00 Canceled 2017-11-30 International 17 21 25 11 23 19 commercialisation des fishing practices and Selection produits des pêches livelihoods activities MG-MRHP-28175-CS- CQS//MG-PM-23 / Étude et enquête sur l'état des lieux des accidents en mer de la Component 3. petite pêche et aux Strengthening capacities for Consultant éventuelles mesures déjà Open - 2019-02- 2017-12- 2018-02- 2019-02- 2018-04- 2019-06- 2018-05- 2019-06- 2018-11- IDA / 59870 engaging in alternative Post Qualification 120,000.00 50,244.29 Signed 2017-11-30 prises/analyse des International 26 21 25 26 11 14 23 14 19 fishing practices and Selection accidentologies/aspect livelihoods activities institutionnel sur les responsabilités de la petite pêche/ à titre provisoire proposer les équipements MG-MRHP-28319-CS- Component 3. QCBS//MG-PM-25 / Strengthening capacities for Diagnostic des besoins en Quality And Cost- Open - 2019-03- 2018-01- 2018-03- 2018-04- 2018-05- 2018-07- 2018-08- 2019-08- IDA / 59870 engaging in alternative Post 150,000.00 0.00 Canceled 2017-12-15 activités alternatives Based Selection International 15 05 12 09 24 05 16 16 fishing practices and adaptées pour chaque région livelihoods activities ultra prioritaire (exécutée par AGEX) MG-MRHP-28322-CS- Component 3. QCBS//MG-PM-27 / Strengthening capacities for Quality And Cost- Open - 2017-01- 2017-11- 2018-01- 2017-09- 2018-02- 2017-10- 2018-04- 2017-10- 2018-05- 2018-08- 2018-07- 2018-09- 2019-07- 2019-07- Détermination des outils IDA / 59870 engaging in alternative Post 60,000.00 66,260.37 Completed 2017-10-30 Based Selection International 24 20 25 06 22 10 08 10 20 08 01 25 01 23 financiers d'appui aux fishing practices and filières et activités livelihoods activities alternatives MG-MRHP-28323-CS- Component 3. CQS//MG-PM-28 / Étude sur Strengthening capacities for Consultant Open - 2017-11- 2018-01- 2018-02- 2018-04- 2018-10- l'amélioration des conditions IDA / 59870 engaging in alternative Post Qualification 60,000.00 0.00 Canceled 2017-10-16 International 06 11 25 08 05 de vie sociale des fishing practices and Selection communautés de pêcheur livelihoods activities MG-MRHP-28330-CS- QCBS//MG-PM-31 / État de Component 3. lieux des petites Strengthening capacities for infrastructures de pêches et Quality And Cost- Open - 2019-04- 2017-11- 2019-04- 2018-01- 2019-06- 2018-02- 2019-07- 2018-04- 2019-07- 2018-05- 2019-09- 2018-07- 2019-10- 2019-07- IDA / 59870 engaging in alternative Post 120,000.00 113,351.50 Signed 2017-10-30 les besoins des Based Selection International 04 20 15 25 06 22 17 08 18 20 13 01 09 01 fishing practices and communautés cibles en livelihoods activities petites infrastructures de pêche et communautaires MG-MRHP-28333-CS- Component 3. QCBS//MG-PM-32 / Étude Strengthening capacities for Quality And Cost- Open - 2017-11- 2018-01- 2018-02- 2018-04- 2018-05- 2018-07- 2019-07- IDA / 59870 Post 200,000.00 0.00 Canceled 2017-10-30 des besoins communautaires engaging in alternative Based Selection International 20 25 22 08 20 01 01 (une étude par district) fishing practices and livelihoods activities MG-MRHP-28336-CS- Component 3. CQS//MG-PM-33 / Strengthening capacities for Consultant Préparation du plan local Open - 2017-11- 2018-01- 2018-03- 2018-04- 2018-10- IDA / 59870 engaging in alternative Post Qualification 60,000.00 0.00 Canceled 2017-10-30 d'électrification International 20 25 11 22 19 fishing practices and Selection communautaire : étude et livelihoods activities rapports MG-MRHP-28342-CS- CQS//MG-PM-39 / Études Component 4. Project Consultant 2017-11- 2018-01- 2018-03- 2018-04- 2018-10- techniques pour la IDA / 59870 management and Post Qualification Open - National 13,500.00 0.00 Canceled 2017-10-30 20 25 11 22 19 construction d'un local pour coordination Selection bureau UGP MG-MRHP-28343-CS- LCS//MG-PM-40 / Études Component 4. Project d'impacts environnementales Least Cost Open - 2018-01- 2018-03- 2018-04- 2018-05- 2018-06- 2018-08- 2019-01- IDA / 59870 management and Post 10,000.00 0.00 Canceled 2017-12-15 et sociales pour la Selection International 05 12 09 09 20 01 28 coordination construction d'un local pour bureau UGP MG-MRHP-27288-CS- Component 2. QCBS//PA62 / Appui à la Strengthening capacities for Quality And Cost- Open - 2016-09- 2017-09- 2017-11- 2017-06- 2017-12- 2017-07- 2018-01- 2017-08- 2018-02- 2017-10- 2018-03- 2018-05- 2019-03- 2019-07- mise en œuvre du plan IDA / Q9790 Post 255,000.00 234,182.87 Completed 2017-09-07 priority fisheries Based Selection International 06 28 11 06 09 17 08 04 12 20 19 02 19 16 d'amélioration de la pêcherie management crevettière MG-MRHP-28654-CS- CQS//MG-PM-113 / Mise à Component 2. Consultant jour de la Stratégie Nationale Strengthening capacities for 2018-02- 2018-04- 2018-06- 2018-07- 2019-01- IDA / 59870 Post Qualification Open - National 30,000.00 0.00 Canceled 2018-02-01 de l'Aquaculture (Consultant priority fisheries 22 29 13 25 21 Selection national + Réunions (1 management consultation, 1 validation) MG-MRHP-28656-CS- CQS//MG-PM-114 / Étude Component 2. sur les procédures Consultant Strengthening capacities for 2018-02- 2018-04- 2018-06- 2018-07- 2019-01- administratives régissant IDA / 59870 Post Qualification Open - National 50,000.00 0.00 Canceled 2018-01-30 priority fisheries 20 27 11 23 19 l'accès aux ressources et Selection management examen des options et recommandations (6 outils de gestion) MG-MRHP-28657-CS- Component 2. CQS//MG-PM-115 / Consultant Strengthening capacities for 2018-06- 2018-08- 2018-10- 2018-11- 2019-05- Diagnostic du secteur dans IDA / 59870 Post Qualification Open - National 30,000.00 0.00 Canceled 2018-06-01 priority fisheries 22 27 11 22 21 le domaine financier local, Selection management régional, international MG-MRHP-28659-CS- CQS//MG-PM-116 / Component 2. Consultant Élaboration de la stratégie Strengthening capacities for 2018-02- 2018-04- 2018-05- 2018-07- 2019-01- IDA / 59870 Post Qualification Open - National 10,000.00 0.00 Canceled 2018-01-30 d'adaptation du secteur priority fisheries 20 27 27 08 04 Selection pêche face au changement management climatique MG-MRHP-28661-CS- Component 2. Consultant CQS//MG-PM-118 / Recueil Strengthening capacities for 2018-06- 2018-08- 2018-09- 2018-11- 2019-05- IDA / D1720 Post Qualification Open - National 30,000.00 0.00 Canceled 2018-06-01 et analyse des informations priority fisheries 22 27 26 07 06 Selection de base avant-projet management MG-MRHP-28663-CS- CQS//MG-PM-119 / Développement et mise en Component 2. Consultant œuvre du système de Strengthening capacities for 2018-04- 2018-06- 2018-07- 2018-08- 2019-02- IDA / D1720 Post Qualification Open - National 5,000.00 0.00 Canceled 2018-04-02 collecte de données pour les priority fisheries 23 06 06 10 06 Selection pêcheries traditionnelles, y management compris une stratégie d'échantillonnage appropriée MG-MRHP-28665-CS- Component 2. Consultant CQS//MG-PM-120 / Collecte Strengthening capacities for 2018-03- 2018-05- 2018-06- 2018-07- 2019-01- IDA / D1720 Post Qualification Open - National 35,000.00 0.00 Canceled 2018-03-01 des données au niveau des priority fisheries 22 05 04 09 05 Selection régions prioritaires (Artfish) management MG-MRHP-28668-CS- Component 2. Consultant CQS//MG-PM-121 / Mise à Strengthening capacities for 2018-02- 2018-04- 2018-05- 2018-06- 2018-12- IDA / D1720 Post Qualification Open - National 50,000.00 0.00 Canceled 2018-02-01 jour de l'Enquête Cadre priority fisheries 22 07 07 11 08 Selection Nationale management MG-MRHP-28669-CS- CQS//MG-PM-122 / Component 2. Consultant Développement et mise en Strengthening capacities for 2018-03- 2018-04- 2018-05- 2018-06- 2018-12- IDA / D1720 Post Qualification Open - National 30,000.00 0.00 Canceled 2018-02-15 œuvre de la collecte de priority fisheries 08 21 21 25 22 Selection données pour les produits management post-capture MG-MRHP-28679-CS- Component 2. CQS//MG-PM-126 / Consultant Strengthening capacities for 2018-09- 2018-11- 2018-12- 2019-01- 2019-07- Développement d'un système IDA / D1720 Post Qualification Open - National 10,000.00 0.00 Canceled 2018-09-03 priority fisheries 24 07 07 11 10 d'information halieutique Selection management modulaire MG-MRHP-28682-CS- Component 2. Consultant CQS//MG-PM-127 / Suivi du Strengthening capacities for 2018-05- 2018-07- 2018-08- 2018-09- 2019-03- IDA / D1720 Post Qualification Open - National 10,000.00 0.00 Canceled 2018-04-30 système d'information priority fisheries 21 04 03 07 06 Selection halieutique modulaire management Page 5 MG-MRHP-28686-CS- Component 2. CQS//MG-PM-129 / Étude Consultant Strengthening capacities for 2018-06- 2018-07- 2018-08- 2018-09- 2019-03- d'impact environnemental et IDA / 59870 Post Qualification Open - National 66,000.00 0.00 Canceled 2018-05-15 priority fisheries 05 19 18 22 21 social de l'extension ou de la Selection management construction MG-MRHP-28687-CS- Component 2. QCBS//MG-PM-130 / Strengthening capacities for Quality And Cost- Open - 2018-04- 2018-06- 2018-07- 2018-08- 2018-09- 2018-10- 2019-10- IDA / 59870 Post 50,000.00 0.00 Canceled 2018-03-15 Élaboration stratégie priority fisheries Based Selection International 05 10 08 07 18 30 30 nationale de recherches management halieutiques MG-MRHP-28690-CS- Component 2. Consultant CQS//MG-PM-134 / Etude Strengthening capacities for Open - 2018-07- 2018-08- 2018-09- 2018-10- 2019-04- IDA / 59870 Post Qualification 30,000.00 0.00 Canceled 2018-06-15 sur les mesures de gestion priority fisheries International 06 19 18 23 21 Selection des poulpes management MG-MRHP-28691-CS- Component 2. QCBS//MG-PM-135 / Avis Strengthening capacities for Quality And Cost- Open - 2018-07- 2018-09- 2018-10- 2018-11- 2019-01- 2019-02- 2020-02- scientifique pour la gestion IDA / 59870 Post 30,000.00 0.00 Canceled 2018-06-29 priority fisheries Based Selection International 20 24 22 21 02 06 06 des pêcheries de langoustes, management dans les sites prioritaires MG-MRHP-28693-CS- QCBS//MG-PM-137 / Component 2. Révision du système de suivi Strengthening capacities for Quality And Cost- Open - 2018-02- 2018-04- 2018-05- 2018-06- 2018-07- 2018-08- 2019-08- de la pêche crevettière IDA / 59870 Post 75,000.00 0.00 Canceled 2018-01-15 priority fisheries Based Selection International 05 12 10 09 21 25 25 traditionnelle (PCT) et management élargissement à toutes les zones de pêche MG-MRHP-28694-CS- Component 2. CQS//MG-PM-138 / Consultant Strengthening capacities for Open - 2018-02- 2018-04- 2018-05- 2018-06- 2018-12- Révision par les pairs des IDA / 59870 Post Qualification 75,000.00 0.00 Canceled 2018-02-01 priority fisheries International 22 07 07 11 08 modèles d'évaluation des Selection management stock de crevettes MG-MRHP-28695-CS- Component 2. CQS//MG-PM-139 / Etat des Consultant Strengthening capacities for Open - 2018-06- 2018-08- 2018-09- 2018-10- 2019-04- lieux et évaluation des IDA / 59870 Post Qualification 10,000.00 0.00 Canceled 2018-05-30 priority fisheries International 20 03 02 07 05 besoins du Ministère en Selection management moyens et équipements MG-MRHP-28703-CS- QCBS//MG-PM-145 / Component 2. Élaboration du plan d'action Strengthening capacities for Quality And Cost- 2018-02- 2018-04- 2018-05- 2018-07- 2018-08- 2018-09- 2019-09- IDA / 59870 Post Open - National 60,000.00 0.00 Canceled 2018-01-30 national sur les requins, les priority fisheries Based Selection 20 20 18 02 06 10 10 oiseaux de mer, les tortues management mrines, (résolution CTOI) MG-MRHP-28706-CS- Component 2. QCBS//MG-PM-149 / Étude Strengthening capacities for Quality And Cost- 2018-10- 2018-12- 2019-01- 2019-02- 2019-03- 2019-05- 2020-05- IDA / 59870 Post Open - National 20,000.00 0.00 Canceled 2018-09-17 sur l'amélioration du priority fisheries Based Selection 08 13 10 24 31 05 04 protocole standard de pêche management MG-MRHP-28707-CS- CQS//MG-PM-150 / Étude Component 2. sur l'évaluation des impacts Consultant Strengthening capacities for 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- des différents engins IDA / 59870 Post Qualification Open - National 30,000.00 0.00 Canceled 2018-09-17 priority fisheries 08 21 21 25 24 (palangres, filets, ...) sur les Selection management espèces menacées (requins, tortues, ...) MG-MRHP-28709-CS- Component 2. CQS//MG-PM-128 / Étude Consultant Strengthening capacities for 2018-03- 2018-04- 2018-05- 2018-06- 2018-12- technique de l'extension ou IDA / 59870 Post Qualification Open - National 67,500.00 0.00 Canceled 2018-02-15 priority fisheries 08 21 21 25 22 construction du bureau Selection management régional MG-MRHP-28713-CS- Component 2. QCBS//MG-PM-155 / Études Strengthening capacities for Quality And Cost- 2018-02- 2018-04- 2018-05- 2018-07- 2018-08- 2018-10- 2019-10- techniques sur la stratégie IDA / D1720 Post Open - National 60,000.00 0.00 Canceled 2018-01-30 priority fisheries Based Selection 20 27 25 09 20 01 01 de surveillance et sur le management fonctionnement du CSP MG-MRHP-28728-CS- Component 2. Consultant CQS//MG-PM-156 / Strengthening capacities for Open - 2018-02- 2018-04- 2018-06- 2018-07- 2019-01- IDA / 59870 Post Qualification 15,000.00 0.00 Canceled 2018-01-30 Rédaction d'un plan national priority fisheries International 20 27 11 23 19 Selection de lutte contre la pêche INN management MG-MRHP-28732-CS- CQS//MG-PM-158 / Etude et élaboration de mécanisme Component 2. Consultant structurel de plateforme de Strengthening capacities for Open - 2018-02- 2018-04- 2018-05- 2018-06- 2018-12- IDA / 59870 Post Qualification 50,000.00 0.00 Canceled 2018-01-30 cogestion des filières priority fisheries International 20 12 12 23 20 Selection prioritaires (crabes, poulpes, management langoustes, holothuries, crevettes) MG-MRHP-28733-CS- Component 2. QCBS//MG-PM-163 / Suivi- Strengthening capacities for Quality And Cost- 2018-03- 2018-05- 2018-06- 2018-07- 2018-09- 2018-10- 2019-10- IDA / 59870 Post Open - National 10,000.00 0.00 Canceled 2018-02-15 évaluation des formations et priority fisheries Based Selection 08 13 10 25 05 17 17 recyclages réalisés management MG-MRHP-28747-CS- Component 3. QCBS//MG-PM-172 / Mise Strengthening capacities for Quality And Cost- Open - 2018-08- 2018-10- 2018-11- 2019-01- 2019-02- 2019-03- 2020-03- en place d'une IDA / 59870 engaging in alternative Post 25,000.00 0.00 Canceled 2018-07-30 Based Selection International 20 25 22 06 17 31 30 règlementation de base fishing practices and concernant la sécurité en livelihoods activities mer de la petite pêche MG-MRHP-28748-CS- Component 3. QCBS//MG-PM-173 / " Étude Strengthening capacities for de marché pour les produits Quality And Cost- Open - 2018-04- 2018-06- 2018-07- 2018-09- 2018-10- 2018-11- 2019-11- IDA / 59870 engaging in alternative Post 90,000.00 0.00 Canceled 2018-03-30 de pêche valorisés dans Based Selection International 20 25 23 06 18 29 29 fishing practices and chaque région ultra livelihoods activities prioritaire " MG-MRHP-28763-CS- Component 3. QCBS//MG-PM-185 / Strengthening capacities for Quality And Cost- Open - 2018-11- 2019-01- 2019-02- 2019-04- 2019-05- 2019-06- 2020-06- Gestion et mise en œuvre : IDA / V0500 engaging in alternative Post 40,000.00 0.00 Canceled 2018-10-30 Based Selection International 20 18 15 01 06 10 09 Suivi évaluation des bases de fishing practices and données livelihoods activities MG-MRHP-28766-CS- Component 4. Project Least Cost Open - 2018-02- 2018-04- 2018-05- 2018-06- 2018-07- 2018-08- 2019-02- LCS//MG-PM-189 / Audit IDA / 59870 management and Post 15,000.00 0.00 Canceled 2018-01-30 Selection International 20 05 03 02 07 11 07 externe des comptes du coordination Projet MG-MRHP-14953-CS- Component 2. LCS//PA67 / PA 67: Strengthening capacities for Least Cost Open - 2018-03- 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2019-01- IDA / Q9790 Post 75,000.00 0.00 Canceled 2018-03-15 Recensement des données priority fisheries Selection International 29 13 20 27 17 15 11 au niveau des régions management prioritaires MG-MRHP-14945-CS- Component 2. Consultant CQS//PA 15 / PA 15: Strengthening capacities for Open - 2018-01- 2018-03- 2018-04- 2018-06- 2018-12- IDA / Q9790 Post Qualification 75,000.00 0.00 Canceled 2017-12-15 Recueillir et analyser des priority fisheries International 05 12 26 07 04 Selection informations de base avant- management projet MG-MRHP-86202-CS- QCBS//PA61 / Recrutement Component 2. d'une firme afin d'appuyer la Strengthening capacities for Quality And Cost- Open - 2016-09- 2018-12- 2019-02- 2017-06- 2019-03- 2017-07- 2019-04- 2017-08- 2019-06- 2018-07- 2019-08- 2018-10- 2020-08- IDA / 59870 Post 262,000.00 317,899.36 Terminated 2018-11-20 mise en place d'outils priority fisheries Based Selection International 20 20 18 06 20 17 19 04 18 05 17 11 16 d'aménagement des management pêcheries à Madagascar MG-MRHP-86206-CS- Component 4. Project LCS//MG-PM 88/18 / Audit Least Cost Open - 2019-02- 2018-12- 2019-03- 2019-02- 2019-04- 2019-03- 2019-06- 2019-03- 2019-08- 2019-03- 2019-11- 2019-04- 2020-05- IDA / 59870 management and Post 45,000.00 14,382.71 Signed 2018-11-30 externe des comptes du Selection International 05 30 15 15 29 15 13 21 27 26 10 16 08 coordination Projet 2018-2019-2020 MG-MRHP-119249-CS- Component 3. QCBS / Etude technique et Strengthening capacities for Quality And Cost- 2019-08- 2019-10- 2019-12- 2020-01- 2020-03- 2020-06- 2021-06- IDA / 59870 Post Open - National 20,000.00 0.00 Canceled 2019-07-03 étude d'Impact engaging in alternative Based Selection 02 31 15 14 29 12 12 Environnemental fishing practices and Réhabilitation du CFPT livelihoods activities MG-MRHP-28674-CS- QCBS//MG-PM-125 / Component 2. Développement de la base Strengthening capacities for Quality And Cost- 2019-08- 2019-11- 2019-12- 2020-01- 2020-03- 2020-05- 2021-05- IDA / 59870 Post Open - National 46,000.00 0.00 Canceled 2019-07-30 de données pour la pêche priority fisheries Based Selection 29 12 12 11 11 10 10 traditionnelle MARITIME et management CONTINENTALE (consultant) MG-MRHP-14951-CS-QCBS / PA 65: Etudes techniques : - Clôture de l'enceinte DRRHP Fénérive - Component 2. Construction des Bureaux de Strengthening capacities for Quality And Cost- Pending 2019-08- 2019-09- 2019-10- 2019-11- 2019-12- 2020-02- 2021-02- IDA / Q9790 Post Open - National 35,000.00 0.00 2019-07-26 06 DRRHP - Extension de priority fisheries Based Selection Implementation 16 29 27 26 31 04 03 l'ASH à Antsiranana et management Morondava - Construction local pour bureau UGP et 08 CirRHP (APS/APD) MG-MRHP-28755-CS- QCBS//MG-PM-177 / Component 3. Élaboration des Plans Strengthening capacities for d'Action aux restrictions de Quality And Cost- Open - Under 2019-08- 2019-09- 2019-08- 2019-11- 2020-01- 2019-12- 2020-02- 2019-12- 2020-04- 2020-02- 2020-04- 2020-03- 2021-03- IDA / 59870 engaging in alternative Post 270,000.00 0.00 2019-08-15 Ressources Based Selection International Implementation 22 05 30 03 29 01 28 31 07 04 13 10 10 fishing practices and (PARAR)/Diagnostic des livelihoods activities besoins en activités alternatives adaptées à chaque région ultra prioritaire (AGR) MG-MRHP-105669-CS- Component 3. QCBS / Recrutement Strengthening capacities for d'agence de communication Quality And Cost- 2019-02- 2019-09- 2019-11- 2019-05- 2019-12- 2019-06- 2020-01- 2019-06- 2020-02- 2019-06- 2020-03- 2019-07- 2021-03- 2019-09- IDA / 59870 engaging in alternative Post Open - National 33,750.00 21,553.74 Completed 2019-09-02 pour la conception et Based Selection 07 23 06 02 04 12 03 12 07 21 13 16 13 17 fishing practices and production des supports de livelihoods activities communications relatifs au MDGP Page 6 MG-MRHP-28174-CS-QCBS / Etude sur le circuit de Component 3. commercialisation des Strengthening capacities for Quality And Cost- Open - 2019-06- 2019-09- 2019-11- 2019-10- 2019-12- 2019-11- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-06- 2021-03- produits des pêches frais et IDA / 59870 engaging in alternative Post 130,000.00 100,145.61 Signed 2019-09-02 Based Selection International 18 23 06 09 04 11 03 13 07 03 13 05 13 identification des techniques fishing practices and de transformation adaptées livelihoods activities pour chaque ZUP MG-MRHP-19124-CS-QCBS PA48 / Etablissement de la Component 4. Project Situation de référence du Quality And Cost- Open - 2017-08- 2017-07- 2017-09- 2017-08- 2017-09- 2017-10- 2017-12- 2018-01- 2019-01- IDA / Q9790 management and Post 75,000.00 0.00 Canceled 2017-06-27 Cadre de résultats et Based Selection International 01 18 06 31 28 28 02 06 06 coordination développement d'un système de gestion de projet MG-MRHP-28701-CS- Component 2. QCBS//MG-PM-144 / Étude Strengthening capacities for Quality And Cost- 2018-05- 2018-07- 2018-08- 2018-09- 2018-10- 2018-11- 2019-11- pour la définition des termes IDA / 59870 Post Open - National 10,000.00 0.00 Canceled 2018-04-16 priority fisheries Based Selection 07 05 02 16 21 25 25 de références du Service de management Gestion de la Pêche Thonière MG-MRHP-28759-CS- Component 3. QCBS//MG-PM-182 / Strengthening capacities for Préparation du plan local Quality And Cost- Open - 2018-04- 2018-06- 2018-07- 2018-08- 2018-10- 2018-11- 2019-11- IDA / V0500 engaging in alternative Post 251,100.00 0.00 Canceled 2018-03-30 d'électrification Based Selection International 20 18 16 30 04 08 08 fishing practices and communautaire : prestations livelihoods activities internationales MG-MRHP-28753-CS- Component 3. QCBS//MG-PM-176 / Strengthening capacities for Évaluation des impacts socio- Quality And Cost- Open - 2018-10- 2018-12- 2018-12- 2019-01- 2019-03- 2019-04- 2020-04- IDA / 59870 engaging in alternative Post 90,000.00 0.00 Canceled 2018-09-14 économiques de la mise Based Selection International 05 03 31 30 06 10 09 fishing practices and pratique des activités livelihoods activities alternatives MG-MRHP-28741-CS- QCBS//MG-PM-168 / Étude Component 3. sur l'identification de Strengthening capacities for Quality And Cost- Open - 2019-11- 2020-01- 2021-04- 2021-06- 2021-08- 2021-09- 2022-09- techniques modernes de IDA / 59870 engaging in alternative Post 100,000.00 0.00 Canceled 2019-09-30 Based Selection International 14 28 28 12 11 22 22 pêche et de fabrication fishing practices and d'engins de pêche adaptés livelihoods activities pour chaque ZUP MG-MRHP-14947-CS- QCBS//PA63 / PA 63: Component 2. Elaboration des plans Strengthening capacities for Quality And Cost- Open - 2017-05- 2017-07- 2017-08- 2017-08- 2017-09- 2017-09- 2018-09- IDA / Q9790 Prior 60,000.00 0.00 Canceled 2017-05-17 d'action nationaux sur les priority fisheries Based Selection International 31 29 05 12 02 30 30 requins, les oiseaux de mer management et les tortues marines (résolutions CTOI) MG-MRHP-28746-CS- QCBS//MG-PM-171 / Identification de matériels de sécurité adaptés aux Component 3. différentes catégories Strengthening capacities for Quality And Cost- Open - 2018-04- 2018-06- 2018-07- 2018-09- 2018-10- 2018-11- 2019-11- d'embarcation et de IDA / 59870 engaging in alternative Post 180,000.00 0.00 Canceled 2018-03-30 Based Selection International 20 25 23 06 18 29 29 navigation, stratégie de mis fishing practices and à disposition des livelihoods activities équipements, d'organisation de secours et la diffusion des informations météorologiques MG-MRHP-28761-CS- Component 3. QCBS//MG-PM-183 / Strengthening capacities for Préparation du plan local Quality And Cost- Open - 2018-04- 2018-06- 2018-07- 2018-08- 2018-09- 2018-10- 2019-10- IDA / V0500 engaging in alternative Post 33,800.00 0.00 Canceled 2018-03-15 d'électrification Based Selection International 05 03 01 15 19 24 24 fishing practices and communautaire : prestations livelihoods activities nationales MG-MRHP-127605-CS-CQS Component 2. Consultant Open - 2019-10- 2019-12- 2020-01- 2020-02- 2020-08- / Etude sur les accidents en IDA / 59870 Strengthening capacities for Post Qualification 90,000.00 0.00 Canceled 2019-09-06 International 06 05 04 24 22 mer de la pêche à petite priority fisheries Selection échelle management MG-MRHP-28697-CS- CQS//MG-PM-140 / Étude Component 2. Consultant sur l'adaptation des missions Strengthening capacities for Open - 2018-05- 2018-07- 2018-08- 2018-09- 2019-03- IDA / 59870 Post Qualification 10,000.00 0.00 Canceled 2018-04-30 et attributions du MRHP par priority fisheries International 21 04 03 07 06 Selection rapport au défi du management développement rural MG-MRHP-23763-CS- QCBS//MG-PM-117 / Recrutement d'un Cabinet Component 3. d'étude ou d'une ONG pour Strengthening capacities for Quality And Cost- 2017-10- 2017-10- 2017-12- 2017-12- 2018-09- 2018-01- 2019-02- 2018-02- 2018-03- 2018-05- 2020-04- assurer les missions de IDA / Q9790 engaging in alternative Prior Open - National 600,000.00 0.00 Canceled 2017-09-14 Based Selection 30 05 01 10 18 07 07 06 20 01 30 l'AGEX pour l'appui à la mise fishing practices and en œuvre du Plan livelihoods activities d'Aménagement Concerté des Pêcheries de la Région Melaky MG-MRHP-23508-CS- QCBS//MG-MP-117 / Recrutement de Cabinet d'étude ou d'une ONG pour Component 3. assurer les missions de Strengthening capacities for Quality And Cost- 2017-10- 2017-10- 2018-08- 2017-12- 2018-09- 2018-01- 2019-02- 2018-02- 2019-09- 2018-03- 2018-05- 2020-04- l'AGEX pour l'appui à la mise IDA / Q9790 engaging in alternative Prior Open - National 600,000.00 0.00 Canceled 2017-09-14 Based Selection 30 05 29 10 18 07 07 06 05 20 01 30 en œuvre du Plan fishing practices and d'Aménagement des livelihoods activities Pêcheries des Baies d'Ampasindava, de Tsimipaika, d'Ambaro, et l'archipel de Nosy Be (BATAN) MG-MRHP-23508-CS-BQS / Recrutement d'une agence Component 3. d'exécution pour l'appui à la Strengthening capacities for mise en œuvre du Plan Quality Based 2020-01- 2017-10- 2020-01- 2017-11- 2020-01- 2017-12- 2019-02- 2018-01- 2020-02- 2018-02- 2020-04- 2018-03- 2020-05- 2019-03- IDA / Q9790 engaging in alternative Prior Open - National 1,600,000.00 1,517,925.94 Signed 2017-09-14 d'Aménagement des Selection 07 05 09 18 23 16 07 15 11 14 14 21 08 21 fishing practices and Pêcheries des Baies livelihoods activities d'Ampasindava, de Tsimipaika, d'Ambaro, et l «archipel de Nosy Be (BATAN) MG-MRHP-23763-CS-BQS / Component 3. Recrutement d'une agence Strengthening capacities for d'exécution pour l'appui à la Quality Based 2019-12- 2017-10- 2020-01- 2017-11- 2020-01- 2017-12- 2019-02- 2018-01- 2020-02- 2018-02- 2020-05- 2018-03- 2020-06- 2021-03- IDA / Q9790 engaging in alternative Prior Open - National 900,000.00 647,158.90 Signed 2017-09-14 mise en œuvre du Plan Selection 18 05 09 18 23 16 07 15 11 14 20 21 15 20 fishing practices and d'Aménagement Concerté livelihoods activities des Pêcheries de la Région Melaky MG-MRHP-150365-CS-CQS / RECRUTEMENT D'UN CONSULTANT NATIONAL POUR LE RENFORCEMENT DE Component 2. CAPACITE DU PERSONNEL DE Consultant Strengthening capacities for Under 2020-03- 2019-12- 2020-09- 2020-01- 2020-03- 2020-03- 2020-05- L’AUTORITE SANITAIRE IDA / 59870 Post Qualification Open - National 15,140.00 0.00 2019-12-24 priority fisheries Implementation 11 31 14 28 08 22 21 HALIEUTIQUE PAR UNE Selection management FORMATION EN LINGUISTIQUE (ANGLAIS / CHINOIS) AU NIVEAU NATIONAL (2.1.7.2.04) MG-MRHP-28740BIS-CS- QCBS // MG-PM-167 / Etude Component 3. sur l'amélioration des Strengthening capacities for Quality And Cost- Under 2020-02- 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2020-07- 2021-03- embarcations existantes à IDA / 59870 engaging in alternative Post Open - National 90,000.00 0.00 2020-02-25 Based Selection Implementation 27 03 18 16 16 06 04 18 25 partir des matériaux locaux fishing practices and bon marché et existants livelihoods activities pour chaque ZUP (3.2.1.1.12) MG-MRHP-28740-CS- Component 3. QCBS//MG-PM-167 / Étude Strengthening capacities for sur l'amélioration des Quality And Cost- Open - 2019-08- 2018-05- 2019-08- 2018-07- 2018-08- 2018-10- 2018-11- 2018-12- 2019-12- IDA / 59870 engaging in alternative Post 60,000.00 0.00 Canceled 2018-04-30 embarcations existantes à Based Selection International 11 21 19 26 23 07 18 30 30 fishing practices and partir des matériaux locaux livelihoods activities bon marché et existants MG-MRHP-86203BIS-CS- QCBS / Recrutement d'une Firme pour Appui à la Mise à jour de la Stratégie Nationale pour le Développement de Component 2. l’Aquaculture à Madagascar Strengthening capacities for Quality And Cost- Under 2020-02- 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-07- 2020-07- 2020-12- IDA / 59870 Post Open - National 50,000.00 0.00 2020-02-28 (SNDAM) et Elaboration des priority fisheries Based Selection Implementation 25 06 07 19 19 09 14 28 15 Plans de Développement des management trois (3) filières « d’algoculture, d’holothuriculture et de crabicultu MG-MRHP-119284-CS- QCBS / Recrutement d'un BE pour Etudes techniques, étude d’impact Component 3. environnemental et social et Strengthening capacities for Quality And Cost- Open - Under 2020-03- 2020-03- 2020-03- 2020-05- 2020-06- 2020-06- 2020-08- 2020-08- 2022-03- contrôle et surveillance des TF / A4588 engaging in alternative Post 44,000.00 0.00 2020-03-06 Based Selection International Implementation 10 27 18 10 09 30 04 25 28 travaux pour la construction fishing practices and des bâtiments du kiosque de livelihoods activities pré-électrification et du « Complexe-pêche » dans 2 villages à Mananara Nord MG-MRHP-86203-CS- QCBS// PA13 / Mise à jour Component 2. de la Stratégie Nationale de Strengthening capacities for Quality And Cost- Open - 2020-02- 2019-08- 2019-11- 2019-12- 2020-02- 2020-04- 2020-06- 2021-06- IDA / 59870 Post 30,000.00 0.00 Canceled 2019-07-31 l’Aquaculture (Consultant priority fisheries Based Selection International 04 30 13 28 11 11 10 10 national + Réunions (1 management consultation, 1 validation) MG-MRHP-14952-CS- LCS//PA66 / PA 66: Etudes d'Impact environnemental et Socail : - Clôture de l'enceinte Component 2. Consultant DRRHP Fénérive Strengthening capacities for Open - 2017-07- 2017-08- 2017-09- 2017-11- 2018-05- IDA / Q9790 Post Qualification 35,000.00 0.00 Canceled 2017-06-27 - Construction des Bureaux priority fisheries International 18 31 30 04 03 Selection de 06 DRRHP management - Extension de l'ASH à Antsiranana et Morondava - Construction local pour bureau UGP Page 7 MG-MRHP-168222-CS- QCBS / Recrutement d'un BE pour la réalisation des Component 2. études techniques- du PGES Strengthening capacities for Quality And Cost- Under 2020-04- 2020-05- 2020-04- 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-05- IDA / 59870 Post Open - National 20,000.00 0.00 2020-04-17 et du contrôle et surveillance priority fisheries Based Selection Implementation 15 08 27 21 19 18 22 27 30 des constructions des management bureaux administratifs de l'ASH à Manakara et Mananjary MG-MRHP-168223-CS- QCBS / Recrutement d'un BE pour la réalisation des Component 2. études techniques- du PGES Strengthening capacities for Quality And Cost- Under 2020-04- 2020-05- 2020-04- 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-05- IDA / 59870 Post Open - National 20,000.00 0.00 2020-04-17 et du contrôle et surveillance priority fisheries Based Selection Implementation 15 08 27 21 19 18 22 27 30 des constructions des management bureaux administratifs de l'ASH-OEPA à Antananarivo MG-MRHP-168224-CS- QCBS / Recrutement d'un BE pour la réalisation des Component 2. études techniques- du PGES Strengthening capacities for Quality And Cost- Under 2020-04- 2020-05- 2020-04- 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-05- IDA / 59870 Post Open - National 20,000.00 0.00 2020-04-17 et du contrôle et surveillance priority fisheries Based Selection Implementation 15 08 27 21 19 18 22 27 30 des constructions des management bureaux administratifs de l'ASH-USTA-SRPA à Majunga MG-MRHP-168226-CS- QCBS / Recrutement d'un BE pour la réalisation des Component 2. études techniques- du PGES Strengthening capacities for Quality And Cost- Under 2020-04- 2020-05- 2020-04- 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-05- IDA / 59870 Post Open - National 10,000.00 0.00 2020-04-17 et du contrôle et surveillance priority fisheries Based Selection Implementation 15 08 27 21 19 18 22 27 30 des constructions des management bureaux administratifs de l'ASH à Toliara MG-MRHP-168227-CS- QCBS / Recrutement d'un BE pour la réalisation des Component 2. études techniques- du PGES Strengthening capacities for Quality And Cost- Under 2020-04- 2020-05- 2020-04- 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-05- IDA / 59870 Post Open - National 10,000.00 0.00 2020-04-17 et du contrôle et surveillance priority fisheries Based Selection Implementation 15 08 27 21 19 18 22 27 30 des constructions des management bureaux administratifs de l'ASH à Fort-Dauphin MG-MRHP-168225-CS- QCBS / Recrutement d'un BE pour la réalisation des Component 2. études techniques- du PGES Strengthening capacities for Quality And Cost- Under 2020-04- 2020-05- 2020-04- 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2021-05- IDA / 59870 Post Open - National 30,000.00 0.00 2020-04-17 et du contrôle et surveillance priority fisheries Based Selection Implementation 15 08 27 21 19 18 22 27 30 des constructions des management bureaux administratifs de l'ASH-SRPA-OEPA à Diégo Suarez MG-MRHP-169196-CS- QCBS / RECRUTEMENT D’UNE FIRME EN CHARGE DE Component 3. L’ELABORATION DES PCD ET Strengthening capacities for PDF DES COMMUNES POUR Quality And Cost- Under 2020-05- 2020-05- 2020-05- 2020-07- 2020-08- 2020-08- 2020-10- 2020-11- 2021-09- IDA / 59870 engaging in alternative Post Open - National 300,000.00 0.00 2020-04-30 LES 3 ZUPs ET REPARTIE EN Based Selection Implementation 04 21 16 04 01 31 05 09 05 fishing practices and TROIS LOTS: livelihoods activities Lot 1: ZUP BA, Lot 2: ZUP BATAN Lot 3: ZUP MELAKY MG-MRHP-170094-CS-CQS / Recrutement d’un Component 2. Consultant consultant chargé de la Strengthening capacities for Under 2020-05- 2020-05- 2020-05- 2020-06- 2020-07- 2020-08- 2021-02- IDA / 59870 Post Qualification Open - National 20,000.00 0.00 2020-04-30 traduction et de la synthèse priority fisheries Implementation 14 21 16 25 25 29 25 Selection des documents du français management et anglais au malagasy officiel MG-MRHP-170870-CS- QCBS / Recrutement d'une Component 2. firme pour l’élaboration du Strengthening capacities for Quality And Cost- Under 2020-05- 2020-05- 2020-05- 2020-07- 2020-08- 2020-09- 2020-10- 2020-11- 2022-02- IDA / 59870 Post Open - National 75,000.00 0.00 2020-05-04 Plan d’Aménagement des priority fisheries Based Selection Implementation 04 25 16 08 05 04 09 13 11 Pêcheries de la Région management ATSIMO ATSINANANA MG-MRHP-174365-CS- QCBS / Recrutement d'un Institut de Recherche ou Component 2. d'une Firme pour appuyer le Strengthening capacities for Quality And Cost- Under 2020-05- 2020-06- 2020-06- 2020-07- 2020-08- 2020-09- 2020-10- 2020-12- 2022-02- Centre d’Etude et de IDA / 59870 Post Open - National 75,000.00 0.00 2020-05-26 priority fisheries Based Selection Implementation 20 16 06 30 27 26 31 05 28 Développement des Pêches management (CEDP) dans l’étude des stocks Halieutiques (Cinq filières Prioritaires) MG-MRHP-181840-CS- Component 3. QCBS / RECRUTEMENT D’UNE Strengthening capacities for FIRME POUR LA FORMATION Quality And Cost- Under 2020-06- 2020-07- 2020-07- 2020-08- 2020-09- 2020-10- 2020-11- 2020-12- 2021-12- IDA / 59870 engaging in alternative Post Open - National 50,000.00 0.00 2020-07-02 DES GROUPEMENTS DE Based Selection Implementation 30 12 16 16 15 06 10 15 15 fishing practices and PÊCHEURS SUR LES livelihoods activities TECHNIQUES COMMERCIALES MG-MRHP-182950-CS-CQS / Recrutement d'agence de communication pour la Component 3. conception et production des Strengthening capacities for Consultant Under 2020-08- 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- 2021-05- supports de communications IDA / 59870 engaging in alternative Post Qualification Open - National 25,000.00 0.00 2020-07-14 Implementation 13 04 26 17 17 21 20 relatifs au MDGP 2020 et fishing practices and Selection pour la mise en oeuvre du livelihoods activities plan de communication du projet SWIOfish2 MG-MRHP-181871-CS- QCBS / Recrutement d’ONG pour la conservation et la Component 3. restauration des forêts de Strengthening capacities for Quality And Cost- Under 2020-10- 2020-07- 2020-10- 2020-09- 2021-05- 2020-10- 2020-11- 2020-12- 2020-12- 2021-12- mangrove, et la protection IDA / 59870 engaging in alternative Prior Open - National 3,000,000.00 0.00 2020-07-21 Based Selection Implementation 07 31 21 13 25 13 03 08 29 29 de récifs coralliens et fishing practices and d’herbiers marins dans des livelihoods activities zones riches en habitats naturels côtiers et marins de Madagascar, répartis en 6 Lots MG-MRHP-183755-CS- QCBS / Recrutement d'une firme pour la réalisation Component 4. Project Quality And Cost- Under 2020-07- 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- 2020-12- 2020-12- 2021-03- d’une enquête de IDA / 59870 management and Post Open - National 75,000.00 0.00 2020-07-17 Based Selection Implementation 22 07 07 11 11 01 06 20 10 satisfaction des bénéficiaires coordination du projet et les membres de la communauté des pêcheurs MG-MRHP-150349-CS-CQS / Recrutement de consultant national pour assurer le Component 2. renforcement de capacité Consultant Strengthening capacities for Pending 2021-01- 2021-02- 2021-03- 2021-04- 2021-04- des agents de IDA / 59870 Post Qualification Open - National 1,500.00 0.00 2021-01-04 priority fisheries Implementation 11 08 20 03 24 l’administration des pêches Selection management et des responsables des textes administratifs en leadership et Gestion axés sur les résultats (2.1.1.1.04) MG-MRHP-28698-CS- Component 2. Consultant 2020-07- 2020-09- 2020-10- 2020-11- 2021-05- CQS//MG-PM-141 / IDA / 59870 Strengthening capacities for Post Qualification Open - National 24,000.00 0.00 Canceled 2020-06-30 21 03 03 07 06 Assistant technique pour priority fisheries Selection UGP management MG-MRHP-183758-CS- Component 2. QCBS / Recrutement d'une Strengthening capacities for Quality And Cost- Under 2020-09- 2020-09- 2020-09- 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-10- IDA / 59870 Post Open - National 75,000.00 0.00 2020-08-27 firme pour étudier la mise en priority fisheries Based Selection Implementation 01 17 10 22 21 12 16 20 18 place des ZEA pêche et management aquaculture MG-MRHP-28689-CS- CQS//MG-PM-133 / Appui Component 2. Consultant du centre de recherche par Strengthening capacities for Open - 2020-08- 2020-11- 2020-12- 2021-03- 2021-09- IDA / 59870 Post Qualification 150,000.00 0.00 Canceled 2020-07-31 deux (02) experts priority fisheries International 30 13 28 13 09 Selection internationaux pour les management évaluations de stocks de 5 filières prioritaires MG-MRHP-190077-CS-CQS / Recrutement d'un cabinet Component 2. Consultant d'étude pour effectuer une Strengthening capacities for Under 2020-09- 2020-09- 2020-09- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 59870 Post Qualification Open - National 20,000.00 0.00 2020-08-31 étude de faisabilité de priority fisheries Implementation 11 21 23 04 04 08 09 Selection l'écloserie en holothuries à management Ambanja MG-MRHP-28671-CS- QCBS//MG-PM-123 / Amélioration de la base de Component 2. données pour la déclaration Strengthening capacities for Quality And Cost- 2018-01- 2018-03- 2018-04- 2018-05- 2018-07- 2018-08- 2019-08- des produits de la pêche IDA / D1720 Post Open - National 20,000.00 0.00 Canceled 2018-01-02 priority fisheries Based Selection 23 30 27 27 08 19 19 régionale (Base de données- management Tableau de bord-Système d'Information Pêche :basé sur le Web, consultant) MG-MRHP-198557-CS- QCBS / Recrutement des BE pour réaliser les études Component 3. techniques et EIES de la Strengthening capacities for Quality And Cost- Under 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- construction des bâtiments TF / A4588 engaging in alternative Post Open - National 130,000.00 0.00 2020-10-16 Based Selection Implementation 19 06 20 19 18 25 29 25 de pré-électrification hors fishing practices and grille et complexe pêche au livelihoods activities niveau BATAN et Aniribe (BA) répartis en 4 Lots MG-MRHP-198566-CS- QCBS / Recrutement des BE Component 3. pour études techniques- Strengthening capacities for Quality And Cost- Pending 2020-11- 2020-12- 2021-01- 2021-02- 2021-04- 2021-05- 2021-12- PGES et contrôle et IDA / 59870 engaging in alternative Post Open - National 240,000.00 0.00 2020-10-23 Based Selection Implementation 13 27 26 25 01 06 02 surveillance des travaux des fishing practices and petites infrastructures de livelihoods activities pêches pour les 3 Zups répartis en 8 Lots. Page 8 MG-MRHP-199272-CS-CQS / Recrutement d'un BE Component 2. Consultant études techniques- EIES et Strengthening capacities for Under 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-09- IDA / 59870 Post Qualification Open - National 20,000.00 0.00 2020-10-19 contrôle et surveillance des priority fisheries Implementation 19 09 13 12 16 04 Selection travaux à la mise en place management d'écloserie_Ambanja MG-MRHP-203599-CS-CQS / Recrutement d’une firme pour la conception et le développement de site web pour l’Observatoire Component 2. Consultant Economique de la Pêche et Strengthening capacities for Under 2020-11- 2020-12- 2020-11- 2021-01- 2021-02- 2021-03- 2021-05- IDA / Q9790 Post Qualification Open - National 45,000.00 0.00 2020-11-20 de l’Aquaculture (OEPA), priority fisheries Implementation 21 11 26 15 14 21 10 Selection pour le Centre d’Etudes et de management Développement des Pêches (CEDP) et pour l’Unité Statistique Thonière d’Antsiran MG-MRHP-208296-CS-CQS / Recrutement d'un BE études techniques, EIES et Component 3. C&S des travaux pour la Strengthening capacities for Consultant construction des bâtiments Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-11- TF / A4588 engaging in alternative Post Qualification Open - National 20,000.00 0.00 2020-12-21 du kiosque de pré- Implementation 12 11 19 14 16 20 16 fishing practices and Selection électrification et du « livelihoods activities Complexe-pêche » dans les villages d’Ambalahonko et Ampasimandroro district de Maintirano MG-MRHP-208303-CS- QCBS / Recrutement des BE Component 3. pour réaliser les études Strengthening capacities for techniques, PGES et et Quality And Cost- Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-05- 2021-07- 2022-01- IDA / 59870 engaging in alternative Post Open - National 180,000.00 0.00 2020-12-21 contrôle et surveillance des Based Selection Implementation 12 11 19 24 26 25 30 04 30 fishing practices and travaux de construction des livelihoods activities petites infrastructures de pêches répartis en 6 lots MG-MRHP-208305-CS-CQS Component 2. / Recrutement d'un BE pour Consultant Strengthening capacities for Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-09- le contrôle et surveillance IDA / 59870 Post Qualification Open - National 20,000.00 0.00 2020-12-21 priority fisheries Implementation 12 11 19 24 26 30 27 des travaux des DRAEP à Selection management Androy, Anosy MG-MRHP-208306-CS-CQS Component 2. / Recrutement d'un BE pour Consultant Strengthening capacities for Under 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-04- 2021-09- le contrôle et la surveillance IDA / 59870 Post Qualification Open - National 8,000.00 0.00 2020-12-21 priority fisheries Implementation 12 11 19 24 26 30 27 des travaux du DRAEP à Selection management Maintirano MG-MRHP-214299-CS- Component 2. QCBS / Recrutement d’une Strengthening capacities for Quality And Cost- Under 2021-01- 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2022-09- firme pour l’élaboration du IDA / 59870 Post Open - National 100,000.00 0.00 2021-01-29 priority fisheries Based Selection Implementation 28 13 04 01 31 21 26 30 23 Plan d’Aménagement des management Pêcheries (PAP) de la Région ANDROY MG-MRHP-216848-CS-CQS / Recrutement d'un BE pour ET, élaboration du PGES et Component 3. C&S relative à la construction Strengthening capacities for Consultant Under 2021-02- 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2022-02- du bureau de la IDA / 59870 engaging in alternative Post Qualification Open - National 33,000.00 0.00 2021-02-17 Implementation 24 10 09 13 13 17 02 Circonscription en charge de fishing practices and Selection la pêche et de l’Aquaculture livelihoods activities et l’l’antenne du Centre de Surveillance des Pêches (CSP) à Maintirano MG-MRHP-218699-CS-CQS Component 2. / Recrutement d’une firme Consultant Strengthening capacities for Under 2021-02- 2021-03- 2021-03- 2021-04- 2021-05- 2021-06- 2021-10- pour Etude des impacts du IDA / 59870 Post Qualification Open - National 30,000.00 0.00 2021-02-15 priority fisheries Implementation 23 08 02 21 21 25 23 COVID19 sur la pêche à Selection management Madagascar MG-MRHP-218708-CS- QCBS / Recrutement d’une Component 3. firme en charge de Strengthening capacities for Quality And Cost- Pending 2021-03- 2021-04- 2021-05- 2021-05- 2021-07- 2021-08- 2021-12- l’élaboration d’un plan de IDA / 59870 engaging in alternative Post Open - National 100,000.00 0.00 2021-02-25 Based Selection Implementation 02 06 06 27 01 05 03 formation/renforcement de fishing practices and capacités des élus et des livelihoods activities acteurs MG-MRHP-119271-CS- Component 3. QCBS / Prestation au Strengthening capacities for Quality And Cost- Open - Pending 2021-09- 2021-11- 2022-01- 2022-02- 2022-04- 2022-06- 2023-06- IDA / 59870 Post 50,000.00 0.00 2021-08-14 formation des cibles en engaging in alternative Based Selection International Implementation 13 27 11 10 11 10 10 activités alternatives(AGR) fishing practices and livelihoods activities MG-MRHP-14959-CS-CQS / Component 3. Mise en place d’une Strengthening capacities for Consultant Open - Pending 2021-11- 2022-01- 2022-03- 2022-05- 2022-11- règlementation de base IDA / 59870 engaging in alternative Post Qualification 60,000.00 0.00 2021-09-30 International Implementation 14 28 14 13 09 concernant la sécurité en fishing practices and Selection mer de la petite pêche livelihoods activities MG-MRHP-28757-CS- QCBS//MG-PM-179 / Étude Component 3. de faisabilité technique des Strengthening capacities for Quality And Cost- Open - Pending 2021-10- 2022-01- 2022-02- 2022-04- 2022-06- 2022-08- 2023-08- constructions IDA / 59870 engaging in alternative Post 795,000.00 0.00 2021-10-01 Based Selection International Implementation 31 14 28 14 13 12 12 d'infrastructures de fishing practices and pêche(APS & APD) (33 livelihoods activities débarcadères, 8 marchés couverts) MG-MRHP-150361-CS-CQS / RECRUTEMENT D'UN CONSULTANT NATIONAL POUR LE RENFORCEMENT DE Component 2. CAPACITE DU PERSONNEL DE Consultant Strengthening capacities for Pending 2021-08- 2021-09- 2021-10- 2021-11- 2022-01- L’AUTORITE SANITAIRE IDA / 59870 Post Qualification Open - National 8,000.00 0.00 2021-08-05 priority fisheries Implementation 12 09 19 02 01 HALIEUTIQUE EN Selection management INFORMATIQUE (BUREAUTIQUE ET PROGRAMMATION) AU NIVEAU NATIONAL (2.1.7.2.02) MG-MRHP-150366-CS-CQS / RECRUTEMENT D'UN Component 2. CONSULTANT NATIONAL Consultant Strengthening capacities for Pending 2021-07- 2021-08- 2021-10- 2021-10- 2021-12- POUR LA FORMATION ET IDA / 59870 Post Qualification Open - National 15,000.00 0.00 2021-07-23 priority fisheries Implementation 30 27 06 20 19 RENFORCEMENT DE Selection management CAPACITE DE L’EQUIPE EN COMMUNICATION (2.1.4.1.05) MG-MRHP-28755BIS-CS- QCBS // MG-PM-177 / Component 3. Élaboration des plans Strengthening capacities for d'action aux restrictions de Quality And Cost- Pending 2019-08- 2020-01- 2020-02- 2020-04- 2020-04- 2021-02- 2021-10- IDA / 59870 engaging in alternative Post Open - National 875,300.00 0.00 2019-08-22 ressources (PARAR) / Based Selection Implementation 30 29 28 07 13 09 07 fishing practices and Diagnostic des besoins en livelihoods activities activités alternatives adaptées à chaque région ultra prioritaire (AGR) MG-MRHP-222309-CS-CQS / Recrutement d'une firme Component 2. Consultant pour réaliser un diagnostic Strengthening capacities for Under 2021-03- 2021-03- 2021-03- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 59870 Post Qualification Open - National 20,000.00 0.00 2021-03-17 institutionnel et priority fisheries Implementation 14 31 26 14 13 18 01 Selection organisationnel de la mise management en oeuvre du projet SWIOFish2 MG-MRHP-222313-CS- QCBS / Recrutement d’une firme en charge de Component 3. l’identification des plans de Strengthening capacities for pérennisation incluant un Quality And Cost- Under 2021-06- 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-01- IDA / 59870 engaging in alternative Post Open - National 90,000.00 0.00 2021-03-24 plan de gestion et un plan Based Selection Implementation 03 07 21 20 20 24 28 26 fishing practices and d’affaire des petites livelihoods activities infrastructures de pêche et complexes pêches dans les zones ultra prioritaires BATAN, BA et MELAKY MG-MRHP-224627-CS-CQS Component 2. Consultant / Recrutement firme pour Strengthening capacities for Under 2021-03- 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- IDA / 59870 Post Qualification Open - National 115,000.00 0.00 2021-03-30 prospection nouvelles zones priority fisheries Implementation 30 20 15 03 03 07 03 Selection de pêche langoustes management MG-MRHP-223841-CS-CQS Component 2. / Cabinet pour le Consultant Strengthening capacities for Under 2021-05- 2021-04- 2021-06- 2021-07- 2021-08- 2021-10- recrutement de 75 IDA / Q9790 Post Qualification Open - National 40,000.00 0.00 2021-03-31 priority fisheries Implementation 01 21 04 04 08 07 enquêteurs pour le Selection management déploiement d'OPENARTFISH dans 5 régions côtières MG-MRHP-222316-CS- Component 2. QCBS / Recrutement d'une Strengthening capacities for Quality And Cost- 2021-04- 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2022-04- firme pour l'Appui au IDA / 59870 Prior Open - National 1,250,000.00 0.00 Under Review 2021-03-31 priority fisheries Based Selection 21 04 04 03 07 12 10 développement de management l’économie bleue à Madagascar MG-MRHP-227234-CS-CQS / Recrutement d'une firme Component 2. Consultant pour la mise à jour de la Strengthening capacities for Under 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- IDA / 59870 Post Qualification Open - National 30,000.00 0.00 2021-04-07 stratégie Nationale de la priority fisheries Implementation 09 28 11 11 15 11 Selection Bonne Gouvernance de la management Pêche Maritime MG-MRHP-229422-CS- Component 2. QCBS / Recrutement des Strengthening capacities for Quality And Cost- Under 2021-05- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2023-01- IDA / 59870 Post Open - National 700,000.00 0.00 2021-05-14 firmes pour l'élaboration des priority fisheries Based Selection Implementation 18 29 28 28 18 22 27 20 PAP régionaux management MG-MRHP-28730-CS- Component 2. Consultant CQS//MG-PM-157 / Étude Strengthening capacities for Open - 2021-07- 2021-09- 2021-10- 2021-11- 2022-05- IDA / 59870 Post Qualification 50,000.00 0.00 Canceled 2021-07-01 pour l'extension de l'ERS vers priority fisheries International 22 04 04 08 07 Selection la flotte nationale management Page 9 MG-MRHP-231603-CS-CQS / Recrutement d'une firme Component 2. Consultant pour réaliser une étude Strengthening capacities for Under 2021-06- 2021-06- 2021-07- 2021-08- 2021-09- 2021-12- IDA / 59870 Post Qualification Open - National 20,000.00 0.00 2021-05-14 diagnostique des besoins en priority fisheries Implementation 09 04 18 17 21 20 Selection renforcement des capacités management DGPA et UGP SWIOFish2 MG-MRHP-231604-CS-LCS Component 4. Project / Recrutement d'audit pour Least Cost Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-01- IDA / Q9790 management and Post Open - National 32,500.00 0.00 2021-05-20 le Centre de Surveillance de Selection Implementation 10 24 21 20 25 29 28 coordination Pêche MG-MRHP-232529-CS- Component 2. QCBS / Recrutement d'une Strengthening capacities for Quality And Cost- Open - 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-11- firme pour le développement IDA / 59870 Prior 2,000,000.00 0.00 Under Review 2021-05-20 priority fisheries Based Selection International 10 24 21 20 25 29 29 de la planification spatiale management maritime PSM à Madagascar MG-MRHP-232532-CS-LCS Component 4. Project / Recrutement d'un cabinet Least Cost Pending 2021-06- 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2023-09- IDA / 59870 management and Post Open - National 50,000.00 0.00 2021-05-20 d'audit externe des comptes Selection Implementation 10 24 21 20 25 29 29 coordination du Projet 2021-2022 et 2023 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MRHP-5189-CS-INDV / Component 2. Etude sur l'adaptation des Individual Strengthening capacities for 2017-04- 2017-04- 2017-05- 2017-11- missions et attributions du IDA / Q9790 Post Consultant Open 15,000.00 0.00 Canceled 2017-02-15 priority fisheries 05 26 31 27 MRHP par rapport aux défis Selection management du développement rural MG-MRHP-23395-CS- INDV//PA75 / Recrutement d'un (01) Spécialiste en Component 4. Project Individual 2017-08- 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2017-10- 2018-05- 2019-04- Passation des Marchés en IDA / Q9790 management and Post Consultant Open 15,600.00 15,412.69 Completed 2017-08-02 03 20 21 11 02 22 03 21 01 appui à l'équipe de passation coordination Selection des marchés de l'UGP SWIOFish2. MG-MRHP-28176-CS- INDV//MG-PM-24 / Diagnostic des techniques de Component 3. valorisation pratiquées à Strengthening capacities for Individual Madagascar et les bonnes 2018-02- 2018-03- 2018-04- 2018-10- IDA / 59870 engaging in alternative Post Consultant Open 30,000.00 0.00 Canceled 2017-11-30 pratique en Afrique et 18 18 10 07 fishing practices and Selection identifier les besoins en livelihoods activities technique de valorisation des produits halieutiques de chaque région ultra prioritaire MG-MRHP-28321-CS- Component 3. INDV//MG-PM-26 / Strengthening capacities for Individual 2018-01- 2018-01- 2018-03- 2018-09- Évaluation du niveau de IDA / D1720 engaging in alternative Post Consultant Open 90,000.00 0.00 Canceled 2017-10-30 10 31 14 10 vulnérabilité des ménages fishing practices and Selection bénéficiaires livelihoods activities MG-MRHP-28328-CS- Component 3. INDV//MG-PM-30 / Strengthening capacities for Individual 2018-01- 2018-02- 2018-03- 2018-09- Élaboration du plan IDA / 59870 engaging in alternative Post Consultant Open 10,500.00 0.00 Canceled 2017-10-30 25 15 29 25 stratégique de fishing practices and Selection développement local (PCD et livelihoods activities PLD) MG-MRHP-28338-CS- Component 4. Project Individual INDV//MG-PM-35 / 2017-12- 2018-01- 2018-02- 2018-08- IDA / 59870 management and Post Consultant Open 20,800.00 0.00 Canceled 2017-10-16 Assistants coordinateurs 20 10 21 20 coordination Selection locaux UGL MG-MRHP-28344-CS- INDV//MG-PM-41 / Component 4. Project Individual 2018-02- 2018-03- 2018-04- 2018-10- Élaboration d'une stratégie IDA / 59870 management and Post Consultant Open 10,000.00 0.00 Canceled 2017-12-15 25 18 29 26 du plan de communication coordination Selection du projet SWIOFish2 MG-MRHP-28345-CS- Component 4. Project Individual INDV//MG-PM-42 / Mise en 2018-01- 2018-02- 2018-03- 2018-09- IDA / 59870 management and Post Consultant Open 2,000.00 0.00 Canceled 2017-11-15 place du site internet du 26 16 30 26 coordination Selection projet SWIOFish2 MG-MRHP-28346-CS- Component 4. Project Individual INDV//MG-PM-43 / Mission 2018-02- 2018-03- 2018-04- 2018-10- IDA / 59870 management and Post Consultant Open 1,000.00 0.00 Canceled 2017-12-15 de couverture des autres 18 11 22 19 coordination Selection activités de communication MG-MRHP-27289-CS- Component 2. INDV//PA27 / Évaluation et Individual Strengthening capacities for 2015-09- 2017-10- 2017-11- 2016-11- 2017-12- 2017-11- 2018-06- 2018-08- développement de la IDA / Q9790 Post Consultant Open 50,000.00 35,963.63 Completed 2017-09-07 priority fisheries 09 26 16 01 21 14 19 30 recherche halieutique (pour Selection management les 5 filières prioritaires MG-MRHP-28651-CS- Component 2. Individual INDV//MG-PM-111 / Strengthening capacities for 2018-09- 2018-09- 2018-11- 2019-05- IDA / 59870 Post Consultant Open 10,000.00 0.00 Canceled 2018-07-02 Assistance Technique priority fisheries 05 26 07 06 Selection juridique pour le SLC management MG-MRHP-28653-CS- INDV//MG-PM-112 / Étude Component 2. et analyse diagnostiques des Individual Strengthening capacities for 2018-04- 2018-04- 2018-06- 2018-12- stratégies du secteur et des IDA / 59870 Post Consultant Open 30,000.00 0.00 Canceled 2018-01-30 priority fisheries 05 26 07 04 anciens plans directeurs et Selection management élaboration du nouveau plan directeur MG-MRHP-28692-CS- INDV//MG-PM-136 / Component 2. Individual Développement des points Strengthening capacities for 2018-05- 2018-05- 2018-06- 2018-12- IDA / 59870 Post Consultant Open 30,000.00 0.00 Canceled 2018-03-01 de référence opérationnels priority fisheries 05 26 30 27 Selection pour la gestion de la pêche management crevettière MG-MRHP-28704-CS- Component 2. Individual INDV//MG-PM-148 / Audit Strengthening capacities for 2018-08- 2018-08- 2018-09- 2019-03- IDA / 59870 Post Consultant Open 30,000.00 0.00 Canceled 2018-06-01 technique et financier de la priority fisheries 05 26 30 29 Selection pêche aux thons management MG-MRHP-28744-CS- Component 3. INDV//MG-PM-169 / Strengthening capacities for Individual 2019-01- 2019-01- 2019-03- 2019-08- Prestataire formateur en IDA / 59870 engaging in alternative Post Consultant Open 30,000.00 0.00 Canceled 2018-11-01 05 26 02 29 construction et entretien des fishing practices and Selection embarcations livelihoods activities MG-MRHP-28751-CS- Component 3. Individual INDV//MG-PM-174 / Strengthening capacities for 2018-08- 2018-09- 2018-10- 2019-04- IDA / 59870 Post Consultant Open 75,000.00 0.00 Canceled 2018-06-15 Prestataire formateur en engaging in alternative 19 09 14 12 Selection technique de valorisation fishing practices and livelihoods activities MG-MRHP-28752-CS- Component 3. Individual INDV//MG-PM-175 / Strengthening capacities for 2018-09- 2018-10- 2018-11- 2019-05- IDA / 59870 Post Consultant Open 25,000.00 0.00 Canceled 2018-06-29 Prestataire formateur en engaging in alternative 17 08 12 11 Selection technique commerciale fishing practices and livelihoods activities MG-MRHP-28758-CS- INDV//MG-PM-181 / Étude Component 3. d'impact environnemental et Strengthening capacities for Individual 2018-07- 2018-08- 2018-09- 2019-03- social des constructions IDA / 59870 engaging in alternative Post Consultant Open 90,000.00 0.00 Canceled 2018-05-30 18 08 12 11 d'infrastructures de fishing practices and Selection pêche(APS & APD) (33 livelihoods activities débarcadères, 8 marchés couverts) MG-MRHP-28762-CS- Component 3. INDV//MG-PM-184 / Strengthening capacities for Individual 2018-07- 2018-08- 2018-09- 2019-03- Gestion et mise en œuvre : IDA / V0500 engaging in alternative Post Consultant Open 15,000.00 0.00 Canceled 2018-05-30 18 08 12 11 évaluation de la mise en fishing practices and Selection place de l'électrification hors livelihoods activities grille MG-MRHP-28765-CS- Component 4. Project Individual INDV//MG-PM-188 / 2018-11- 2018-12- 2019-01- 2019-07- IDA / 59870 management and Post Consultant Open 7,800.00 0.00 Canceled 2018-10-01 Responsable Passation de 19 10 14 13 coordination Selection marché MG-MRHP-28769-CS- Component 4. Project Individual INDV//MG-PM-191 / 2018-04- 2018-05- 2018-06- 2018-12- IDA / 59870 management and Post Consultant Open 1,000.00 0.00 Canceled 2018-03-01 Mission de couverture des 19 10 14 11 coordination Selection autres activités de communication MG-MRHP-28770-CS- Component 4. Project Individual INDV//MG-PM-192 / 2018-04- 2018-05- 2018-06- 2018-12- IDA / 59870 management and Post Consultant Open 8,000.00 0.00 Canceled 2018-02-28 Réalisation du Bulletin 18 09 13 10 coordination Selection trimestriel SWIOFish2 MG-MRHP-14956-CS- INDV//70 / PA 70: Etude sur Component 2. Individual l'adaptation des missions et Strengthening capacities for 2018-02- 2018-02- 2018-04- 2018-10- IDA / Q9790 Post Consultant Open 15,000.00 0.00 Canceled 2017-11-30 attributions du MRHP par priority fisheries 10 24 07 04 Selection rapport aux défis du management développement rural MG-MRHP-14959-CS- Component 3. INDV//PA71 / PA 71: Mise Strengthening capacities for Individual 2018-07- 2018-08- 2018-09- 2019-03- en place d'une IDA / Q9790 engaging in alternative Post Consultant Open 1,000.00 0.00 Canceled 2018-05-31 26 09 20 19 règlementation de base fishing practices and Selection concernant la sécurité en livelihoods activities mer de la petite pêche Page 10 MG-MRHP-14955-CS- Component 2. INDV//69 / PA 69: Individual Strengthening capacities for 2018-06- 2018-07- 2018-08- 2019-02- Elaboration du Schéma IDA / Q9790 Post Consultant Open 8,000.00 0.00 Canceled 2018-05-15 priority fisheries 26 10 14 10 d'aménagement aquacole Selection management national (algues, crabes, holothurie etc) MG-MRHP-14954-CS- INDV//PA68 / PA 68: Component 2. Individual Conception d'un système de Strengthening capacities for 2018-02- 2018-02- 2018-03- 2018-09- IDA / Q9790 Post Consultant Open 10,000.00 0.00 Canceled 2017-12-30 collecte de données pour les priority fisheries 03 17 24 20 Selection pêcheries traditionnelles, y management compris une stratégie MG-MRHP-14497-CS- INDV//PA-42 / PA 42: Etude Component 2. sur les FFOM et mesures Individual Strengthening capacities for 2017-07- 2017-07- 2017-08- 2018-02- nécessaires pour le IDA / Q9790 Post Consultant Open 25,000.00 0.00 Canceled 2017-05-29 priority fisheries 03 10 14 10 développement de la pêche Selection management nationale et attirer la flotte étrangère MG-MRHP-14950-CS- INDV//PA64 / PA 64: Etude sur les besoins en formation, Component 2. Individual en Equipements et Strengthening capacities for 2017-07- 2017-07- 2017-08- 2018-02- IDA / Q9790 Prior Consultant Open 20,000.00 0.00 Canceled 2017-05-29 immobiliers de priority fisheries 03 10 07 03 Selection l'Administration (Central et management DRRHP) Plans de formation et d'investissement MG-MRHP-14948-CS- Component 2. INDV//PA21 / PA 21: Etude Individual Strengthening capacities for 2018-06- 2018-07- 2018-07- 2019-01- de faisabilité du projet IDA / Q9790 Post Consultant Open 20,000.00 0.00 Canceled 2018-05-15 priority fisheries 26 03 31 27 d'Ecole Nationale Selection management Halieutique, les besoins en formation MG-MRHP-28167-CS- QCBS//MG-PM-15 / Développement et mise en Component 2. Individual œuvre du système de Strengthening capacities for 2018-03- 2018-04- 2018-05- 2018-11- IDA / D1720 Post Consultant Open 5,000.00 0.00 Canceled 2017-12-15 collecte de données pour les priority fisheries 12 02 14 10 Selection pêcheries traditionnelles, y management compris une stratégie d'échantillonnage appropriée MG-MRHP-28339-CS- Component 4. Project Individual CQS//MG-PM-37 / Under 2017-08- 2017-12- 2018-01- 2017-12- 2018-02- 2018-07- IDA / 59870 management and Post Consultant Open 4,000.00 0.00 2017-10-19 Recrutement d'un Chef Implementation 24 07 23 28 01 31 coordination Selection Comptable MG-MRHP-28711-CS- QCBS//MG-PM-153 / Étude Component 2. Individual de prospection des lieux Strengthening capacities for 2018-12- 2018-12- 2019-02- 2019-08- IDA / 59870 Post Consultant Open 1,500.00 0.00 Canceled 2018-10-01 d'implantation des deux priority fisheries 05 26 06 05 Selection antennes regionales de management l'USTA (Majunga, Tamatave) MG-MRHP-28712-CS- Component 2. Individual QCBS//MG-PM-154 / Étude Strengthening capacities for 2019-02- 2019-03- 2019-04- 2019-10- IDA / 59870 Post Consultant Open 1,500.00 0.00 Canceled 2018-12-03 de mise en place des priority fisheries 13 06 10 07 Selection antennes régionales management MG-MRHP-33990-CS- Component 2. Individual INDV//MG-PM 68 / Strengthening capacities for 2018-01- 2018-02- 2018-03- 2018-09- IDA / D1720 Post Consultant Open 26,000.00 0.00 Canceled 2017-11-02 Assistance technique pour le priority fisheries 21 11 25 21 Selection suivi des travaux de management carénage MG-MRHP-86203-CS- Component 2. Individual INDV// PA13 / Mise à jour Strengthening capacities for 2019-01- 2019-03- 2019-04- 2019-07- 2020-01- IDA / 59870 Post Consultant Open 30,000.00 0.00 Canceled 2018-11-22 de la Stratégie Nationale de priority fisheries 31 07 21 05 01 Selection l'Aquaculture management MG-MRHP-86204-CS-INDV Component 2. / Recrutement d'un Individual Strengthening capacities for 2018-12- 2019-03- 2019-02- 2019-04- 2019-02- 2019-06- 2018-12- 2019-12- 2020-04- consultant pour convertir IDA / D1720 Post Consultant Open 55,000.00 39,810.58 Completed 2018-11-26 priority fisheries 17 11 26 10 26 24 26 21 02 OPENARTFISH dans une base Selection management de données basée sur le We MG-MRHP-86205-CS- Component 2. INDV//MG-PM 51/18 / Individual Strengthening capacities for 2018-08- 2019-03- 2018-10- 2019-04- 2018-11- 2019-06- 2018-11- 2019-12- Assistance technique pour le IDA / D1720 Post Consultant Open 26,000.00 24,252.91 Signed 2018-11-22 priority fisheries 10 07 23 06 08 20 13 17 suivi des travaux de Selection management carénage de l'Atsantsa MG-MRHP-105669-CS- Component 3. INDV / Recrutement Strengthening capacities for Individual d'agence de communication 2019-03- 2019-04- 2019-04- 2019-05- 2019-11- IDA / 59870 engaging in alternative Post Consultant Open 5,625.00 0.00 Canceled 2019-03-12 pour la conception et 20 23 30 28 24 fishing practices and Selection production des supports de livelihoods activities communications relatifs au MDGP MG-MRHP-119243-CS- Component 2. INDV / Assistance technique Individual Strengthening capacities for 2019-08- 2019-11- 2020-01- 2020-03- 2020-09- pour la coordination IDA / 59870 Post Consultant Open 15,000.00 0.00 Canceled 2019-08-15 priority fisheries 09 28 12 27 23 génerale des activités durant Selection management l'élaboration du PAP Atsimo Atsinanana MG-MRHP-119244-CS- INDV / Etude sur l'analyse de Component 2. Individual problématiques liées à la Strengthening capacities for 2019-08- 2020-01- 2020-01- 2020-03- 2020-02- 2020-05- 2020-03- 2020-11- IDA / D1720 Post Consultant Open 20,000.00 10,846.29 Signed 2019-10-15 pratique courante des priority fisheries 02 28 17 13 21 12 09 08 Selection sennes de plage dans la Baie management d’ Antongil MG-MRHP-119261-CS- Component 3. Individual INDV / Prestataire formateur Strengthening capacities for 2019-12- 2020-01- 2020-03- 2020-09- IDA / 59870 Post Consultant Open 30,000.00 0.00 Canceled 2019-09-15 en construction et entretien engaging in alternative 29 28 28 24 Selection des engins de pêche fishing practices and livelihoods activities Component 3. MG-MRHP-119286-CS- Individual Strengthening capacities for 2019-12- 2020-01- 2020-03- 2020-09- INDV / Consultance et appui IDA / 59870 Post Consultant Open 45,900.00 0.00 Canceled 2019-08-30 engaging in alternative 13 12 27 23 à la composante 3 Selection fishing practices and livelihoods activities MG-MRHP-119288-CS- Component 4. Project Individual 2019-08- 2019-10- 2019-10- 2019-11- 2019-11- 2020-01- 2019-11- 2020-07- INDV / Consultance et appui IDA / 59870 management and Post Consultant Open 15,300.00 11,155.20 Terminated 2019-07-31 28 29 22 28 12 18 25 16 à la composante 4 coordination Selection MG-MRHP-119289-CS-CDS Component 4. Project 2019-07- 2019-08- 2019-08- 2019-11- 2019-08- 2020-05- / Responsable Administratif IDA / 59870 management and Post Direct Selection Direct 20,400.00 16,266.60 Signed 2019-07-15 29 19 08 17 16 15 et Financier coordination MG-MRHP-119291-CS- Component 4. Project Individual Under 2019-10- 2019-10- 2019-11- 2020-01- 2020-07- INDV / Personnel d'appui : IDA / 59870 management and Post Consultant Open 4,200.00 0.00 2019-07-31 Implementation 10 29 28 18 16 Secrétaire coordination Selection MG-MRHP-28341-CS- Component 4. Project Individual CQS//MG-PM-38 / Under 2017-08- 2019-09- 2018-01- 2019-09- 2019-10- 2020-04- IDA / 59870 management and Post Consultant Open 24,000.00 0.00 2019-07-15 Recrutement de deux (02) Implementation 24 02 22 23 28 25 coordination Selection Comptables MG-MRHP-119292-CS- Component 4. Project Individual Pending 2019-07- 2019-08- 2019-09- 2020-03- INDV / Personnel d'appui IDA / 59870 management and Post Consultant Limited 1,320.00 0.00 2019-07-15 Implementation 20 10 14 12 (Femme de ménage et coordination Selection gardien) MG-MRHP-119293-CS- Component 4. Project Individual Pending 2019-07- 2019-08- 2019-09- 2020-03- INDV / Personnel d'appui : IDA / 59870 management and Post Consultant Limited 25,200.00 0.00 2019-07-15 Implementation 20 10 14 12 Chauffeur coordination Selection MG-MRHP-28673-CS- Component 2. INDV//MG-PM-124 / Individual Strengthening capacities for 2019-09- 2019-09- 2019-10- 2020-04- Amélioration de la base de IDA / D1720 Post Consultant Open 15,000.00 0.00 Canceled 2019-07-01 priority fisheries 04 25 30 27 données pour les pêcheries Selection management industrielles MG-MRHP-23395-CS- INDV//SPM / Frais de personnel du projet : Component 4. Project Individual recrutement d'un (01) 2019-08- 2019-09- 2019-10- 2019-10- 2019-10- 2019-11- 2019-10- 2020-05- IDA / 59870 management and Post Consultant Open 88,400.00 14,322.53 Signed 2019-07-26 Spécialiste en Passation des 01 13 04 04 15 08 21 06 coordination Selection Marchés en appui à l'équipe de passation des marchés de l'UGP SWIOFish2. MG-MRHP-119243BIS-CS- INDV / Recrutement d’un consultant individuel pour Component 2. Individual l’assistance technique de Strengthening capacities for 2019-08- 2019-12- 2019-10- 2020-01- 2019-11- 2020-04- 2019-12- 2020-10- IDA / 59870 Post Consultant Open 35,000.00 89,509.64 Signed 2019-08-15 l’Administration en charge priority fisheries 22 13 22 27 27 11 02 08 Selection de la Pêche et de management l’Aquaculture et de l’UGP du Projet SWIOFish2 dans le cadre de la Cogestion MG-MRHP-123343-CS- INDV / Développer la base de données intégrée des Component 2. pêches de Madagascar et le Individual Strengthening capacities for 2019-08- 2019-11- 2019-10- 2019-11- 2020-02- 2020-01- 2020-02- 2020-07- registre des pêcheurs et IDA / D1720 Post Consultant Open 50,000.00 38,851.99 Signed 2019-09-02 priority fisheries 22 06 22 27 19 08 19 06 embarcations dans une base Selection management de donnée basé sur le Web (lignes des études regroupées: 2.1.2.1.13 - 2.1.2.1.13.1 - 2.1.2.1.13.2) MG-MRHP-28764-CS- Component 4. Project Individual INDV//MG-PM-187 / 2018-11- 2018-12- 2019-01- 2019-07- IDA / 59870 management and Post Consultant Open 62,400.00 0.00 Canceled 2018-10-01 Assistants coordinateurs 19 10 14 13 coordination Selection locaux UGL Page 11 MG-MRHP-28735-CS- Component 3. INDV//MG-PM-164 / Strengthening capacities for Individual 2018-05- 2018-05- 2018-06- 2018-12- Recensement et IDA / 59870 engaging in alternative Post Consultant Open 20,000.00 0.00 Canceled 2018-02-28 04 25 29 26 identification des fishing practices and Selection bénéficiaires chaque année livelihoods activities MG-MRHP-127608-CS- Component 4. Project Individual 2019-12- 2020-01- 2020-03- 2020-09- INDV / Assistance technique IDA / 59870 management and Post Consultant Open 1,500.00 0.00 Canceled 2019-09-23 22 21 12 08 - maintenance coordination Selection MG-MRHP-28926-CS- Component 4. Project Individual INDV//MG-PM-17 / 2018-03- 2018-04- 2018-05- 2018-11- IDA / 59870 management and Post Consultant Open 3,500.00 0.00 Canceled 2018-01-15 Évaluation semestrielle du 21 11 16 12 coordination Selection projet MG-MRHP-127606-CS- Component 2. Individual INDV / Etude diagnostic sur Strengthening capacities for 2019-12- 2020-01- 2020-03- 2020-09- IDA / 59870 Post Consultant Open 20,000.00 0.00 Canceled 2019-09-18 la pêcherie crevettière à priority fisheries 17 16 07 03 Selection Madagascar management MG-MRHP-141087-CS- Component 4. Project Individual INDV / Recrutement d’un 2019-10- 2019-11- 2019-12- 2019-11- 2019-12- 2019-11- 2019-12- 2022-11- IDA / 59870 management and Post Consultant Open 39,000.00 11,366.04 Signed 2019-10-31 Chef Comptable (CC) au sein 28 21 11 23 13 27 19 26 coordination Selection de l’UGP MG-MRHP-141088-CS- Component 4. Project Individual 2019-10- 2019-11- 2019-12- 2019-11- 2019-12- 2019-11- 2019-12- 2022-11- INDV / Recrutement d'un IDA / 59870 management and Post Consultant Open 24,000.00 8,605.72 Signed 2019-10-31 28 21 09 23 13 27 18 26 comptable coordination Selection MG-MRHP-146229-CS- INDV / Recrutement d’un Component 2. consultant national pour Individual Strengthening capacities for 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- 2019-12- 2019-12- 2020-01- animer l’atelier national IDA / 59870 Post Consultant Limited 2,800.00 2,496.64 Signed 2019-11-21 priority fisheries 14 26 23 01 13 22 04 05 relatif à la communication de Selection management la nouvelle loi portant Code de la Pêche et de l'Aquaculture à Madagascar MG-MRHP-146231-CS- INDV / Recrutement d’un Assistant Technique pour les Component 4. Project Individual constructions et 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2019-12- 2020-01- 2022-12- IDA / 59870 management and Post Consultant Open 25,000.00 943.39 Signed 2019-11-21 réhabilitations d’ 06 15 17 25 24 29 24 28 coordination Selection infrastructures de pêche, communautaires et administratives MG-MRHP-119287-CS-CDS Component 4. Project / Contrôle et surveillance de 2019-10- 2020-02- 2020-08- IDA / 59870 management and Post Direct Selection Direct 12,000.00 0.00 Canceled 2019-08-30 la construction de bureau de 29 11 09 coordination l'UGP centrale MG-MRHP-149046-CS-CDS / RECRUTEMENT DE CONSULTANT NATIONAL POUR ASSURER LE Component 2. RENFORCEMENT DE Strengthening capacities for 2019-12- 2020-01- 2020-05- 2020-01- 2020-09- 2020-02- IDA / 59870 Post Direct Selection Direct 6,290.00 7,739.85 Signed 2019-12-30 CAPACITES DES BIOLOGISTES priority fisheries 26 05 14 20 04 04 DU CDA DANS LE DOMAINE management DE L’AQUACULTURE MARINE ET DULCAQUICOLE (2.1.1.3.03) MG-MRHP-160293-CS- INDV / Recrutement d'un Component 2. consultant pour l'élaboration Individual Strengthening capacities for Under 2020-02- 2020-03- 2020-04- 2020-04- 2020-08- de procédure de délivrance IDA / 59870 Post Consultant Open 15,000.00 0.00 2020-02-27 priority fisheries Implementation 25 30 09 23 11 des cartes pêcheurs et Selection management d'immatriculation des pirogues MG-MRHP-160452-CS- Component 2. INDV / Recrutement d’un Individual Strengthening capacities for 2020-03- 2020-04- 2020-07- 2020-05- 2020-08- 2020-05- 2020-08- 2022-05- Assistant technique pour l’ IDA / D1720 Post Consultant Open 85,000.00 15,207.52 Signed 2020-03-10 priority fisheries 06 19 01 10 17 24 18 24 Appui au renforcement des Selection management capacités opérationnelles du CSP MG-MRHP-160443-CS-CDS Component 2. / Recrutement d'Institut de Strengthening capacities for Under 2020-03- 2020-03- 2020-04- 2020-04- Formation en technique IDA / 59870 Post Direct Selection Direct 3,000.00 0.00 2020-03-09 priority fisheries Implementation 01 19 17 27 d'analyse de détection de management maladie aquatique MG-MRHP-161605-CS- INDV / Recrutement d'un Component 4. Project Individual consultant individuel pour la 2020-03- 2020-04- 2020-05- 2020-05- 2020-06- 2020-05- 2020-06- 2020-09- IDA / 59870 management and Post Consultant Open 100,000.00 34,272.29 Signed 2020-03-13 réalisation de l’évaluation à 02 27 26 11 22 25 23 22 coordination Selection mi-parcours des objectifs du projet SWIOFish2 MG-MRHP-161625-CS-CDS Component 2. / Recrutement d'un BE pour Strengthening capacities for 2020-03- 2020-03- 2020-05- 2020-05- 2020-11- 2021-10- le contrôle et la surveillance IDA / 59870 Post Direct Selection Direct 12,600.00 22,582.18 Signed 2020-03-16 priority fisheries 20 26 26 30 05 27 des travaux du CIRAEP management Maroantsetra MG-MRHP-159186-CS-CDS / Recrutement d'une Component 3. Association/ONG pour la Strengthening capacities for 2020-04- 2020-04- 2020-05- 2020-05- 2020-08- 2021-10- promotion de l'approche IDA / 59870 engaging in alternative Post Direct Selection Direct 90,000.00 90,332.42 Signed 2020-03-31 16 10 15 01 18 31 Groupe d'Epargne fishing practices and Communautaire (GEC) Zone livelihoods activities BATAN (3.2.5.1.02.1) MG-MRHP-165352-CS-CDS / Recrutement d'une Component 3. Association / ONG pour la Strengthening capacities for 2020-04- 2020-04- 2020-09- 2020-05- 2021-01- 2021-11- promotion de l'approche IDA / 59870 engaging in alternative Post Direct Selection Direct 90,000.00 80,997.01 Signed 2020-04-01 16 11 18 02 13 01 Groupe d'Epargne fishing practices and Communautaire (GEC) Zone livelihoods activities MELAKY (3.2.5.1.02.1) MG-MRHP-165351-CS-CDS / Recrutement d'une Component 3. Association / ONG pour la Strengthening capacities for 2020-04- 2020-04- 2020-07- 2020-05- 2020-10- 2021-11- promotion de l'approche IDA / 59870 engaging in alternative Post Direct Selection Direct 90,000.00 75,162.11 Signed 2020-04-10 16 20 24 11 08 10 Groupe d'Epargne fishing practices and Communautaire (GEC) Zone livelihoods activities BA (3.2.5.1.02.1) MG-MRHP-167265-CS-CDS / Acquisition et maintenance d'un Logiciel Informatisé de Component 4. Project 2020-04- 2020-04- 2020-04- 2020-06- 2020-05- 2020-12- Gestion Administrative, IDA / 59870 management and Post Direct Selection Direct 50,000.00 40,829.47 Signed 2020-04-10 07 20 16 24 11 21 Comptable, Budgétaire et coordination Financière pour le Projet SWIOFish2 MG-MRHP-119242-CS- Component 2. INDV / Elaboration du plan Individual Strengthening capacities for 2019-11- 2019-12- 2020-02- 2020-08- de développement des 3 IDA / 59870 Post Consultant Open 20,000.00 0.00 Canceled 2019-08-01 priority fisheries 14 14 12 10 filières aquaculture Selection management (algue,holothurie,crabe) MG-MRHP-149438-CS- INDV / Recrutement d'un Consultant individuel pour la facilitation des ateliers de Component 2. Individual sensibilisation régionale au Strengthening capacities for Under 2020-04- 2020-06- 2020-05- 2020-07- 2020-07- 2020-09- IDA / 59870 Post Consultant Limited 3,000.00 0.00 2020-06-19 niveau des 13 régions priority fisheries Implementation 16 25 27 02 16 14 Selection côtières, relatifs à la management communication de la nouvelle loi portant Code de la Pêche et de l'Aquaculture à Madagascar MG-MRHP-119286-CS- INDV-2 / Recrutement d’un Component 3. Consultant individuel pour Strengthening capacities for Individual Under 2020-04- 2020-06- 2020-06- 2020-07- 2021-07- l’appui technique à la mise TF / A4588 engaging in alternative Post Consultant Open 85,000.00 0.00 2020-04-24 Implementation 21 06 20 04 04 en œuvre de l’électrification fishing practices and Selection hors grille dans le cadre du livelihoods activities projet SWIOFish2 MG-MRHP-28756-CS- Component 3. INDV//MG-PM-178 / Strengthening capacities for Individual 2019-11- 2019-12- 2020-01- 2020-03- 2020-09- Élaboration du plan IDA / 59870 engaging in alternative Post Consultant Open 300,000.00 0.00 Canceled 2019-08-30 05 13 27 27 23 stratégique de fishing practices and Selection développement local (PCD et livelihoods activities PLD) MG-MRHP-170896-CS- INDV / Recrutement d'un Component 2. Individual Consultant pour la mise en Strengthening capacities for Under 2020-05- 2020-07- 2020-07- 2020-09- 2021-09- IDA / D1720 Post Consultant Open 30,000.00 0.00 2020-05-04 place de Base Des Données priority fisheries Implementation 24 08 29 09 09 Selection et la conception d'un logiciel management de collecte de données_OEPA MG-MRHP-119288BIS-CS- INDV / Recrutement d'un Component 4. Project Individual Under 2019-08- 2020-03- 2020-03- 2020-04- 2020-04- 2021-04- responsable en IDA / 59870 management and Post Consultant 15,000.00 0.00 2019-08-19 Implementation 28 20 20 17 20 20 communication 2 de l'UGP coordination Selection SWIOfish2 MG-MRHP-170881-CS- Component 2. INDV / Recrutement d’un Individual Strengthening capacities for Under 2020-05- 2020-06- 2020-07- 2020-08- 2021-08- consultant individuel IDA / 59870 Post Consultant Open 15,000.00 0.00 2020-05-04 priority fisheries Implementation 13 22 13 17 17 spécialiste de la petite pêche Selection management au sein de l’UGP du Projet SWIOFish2 MG-MRHP-170887-CS- INDV / Recrutement d’un Component 3. consultant individuel Strengthening capacities for Individual Under 2020-05- 2020-07- 2020-07- 2020-08- 2021-08- spécialiste du IDA / 59870 engaging in alternative Post Consultant Open 15,000.00 0.00 2020-05-15 Implementation 14 03 24 28 28 développement des chaines fishing practices and Selection de valeur de la petite pêche livelihoods activities au sein de l’UGP du Projet SWIOFish2 Page 12 MG-MRHP-173507-CS- Component 2. INDV / Recrutement de Individual Strengthening capacities for Under 2020-05- 2020-06- 2020-06- 2020-07- 2020-07- consultant Individuel pour la IDA / 59870 Post Consultant Open 15,000.00 0.00 2020-05-20 priority fisheries Implementation 14 22 29 19 29 formation en technique Selection management d'approche et animation rurale MG-MRHP-173508-CS- Component 2. INDV / Recrutement de Individual Strengthening capacities for Under 2020-05- 2020-07- 2020-08- 2020-09- 2020-09- consultant Individuel pour IDA / 59870 Post Consultant Open 15,000.00 0.00 2020-05-20 priority fisheries Implementation 14 17 07 05 15 formation en technique de Selection management négociation et leadership MG-MRHP-119245 BIS1-CS- CDS / Recrutement d'un BE pour le Contrôle et Component 2. surveillance des travaux de Strengthening capacities for 2019-07- 2019-08- 2019-08- 2019-11- 2020-03- 2021-04- IDA / 59870 Post Direct Selection Direct 56,000.00 51,918.79 Signed 2019-07-24 construction de l'UGP priority fisheries 24 14 14 12 17 10 SWIOFish2 Nanisana, DRRHP management Analanjirojo et ASH Morondava MG-MRHP-119245-CS-CDS Component 2. / Contrôle et surveillance Strengthening capacities for 2019-07- 2019-10- 2019-08- 2020-01- 2020-07- des travaux de constructions IDA / 59870 Post Direct Selection Direct 84,000.00 0.00 Canceled 2019-08-01 priority fisheries 24 15 14 13 11 pour les six (06) DRRHP et management huit (08) CIRRHP MG-MRHP-172004-CS- INDV / Recrutement d’un Component 2. consultant individuel pour Individual Strengthening capacities for Under 2020-05- 2020-07- 2020-08- 2020-09- 2023-09- l’appui technique à la mise IDA / 59870 Post Consultant Open 50,000.00 0.00 2020-05-26 priority fisheries Implementation 20 14 04 08 08 en œuvre des activités Selection management d’aquaculture dans le cadre du projet SWIOFish2 MG-MRHP-28341 BIS 2-CS- Component 4. Project Individual INDV / Recrutement d'un Pending 2019-03- 2019-03- 2019-03- 2020-03- IDA / 59870 management and Post Consultant Open 12,000.00 0.00 2019-02-18 Comptable remplaçant en Implementation 12 22 30 29 coordination Selection 2019 MG-MRHP-179481-CS- Component 3. Individual INDV / Recrutement d’un Strengthening capacities for Under 2020-06- 2020-07- 2020-08- 2020-09- 2020-11- IDA / 59870 Post Consultant Open 50,000.00 0.00 2020-06-18 formateur sur la technique engaging in alternative Implementation 19 30 20 01 30 Selection de pêche moderne fishing practices and livelihoods activities MG-MRHP-179501-CS- Component 2. INDV / RECRUTEMENT D’UN Individual Strengthening capacities for Under 2020-07- 2020-08- 2020-08- 2020-09- 2021-03- CONSULTANT SPÉCIALISTE IDA / 59870 Post Consultant Open 10,000.00 0.00 2020-06-19 priority fisheries Implementation 07 07 28 11 10 EN SYSTEME D’INFORMATION Selection management GEOGRAPHIQUE (SIG) MG-MRHP-179518-CS-CDS / Recrutement d'une firme Component 2. pour assurer le renforcement Strengthening capacities for 2020-06- 2020-07- 2020-07- 2020-07- 2020-10- 2020-08- IDA / 59870 Post Direct Selection Direct 10,000.00 23,550.98 Signed 2020-06-22 des capacités des agents de priority fisheries 24 09 22 24 01 08 la DGPA à l'IHSM en management algoculture et holothuriculture MG-MRHP-182966-CS- Component 2. INDV / Recrutement d'un Individual Strengthening capacities for Under 2020-07- 2020-09- 2020-09- 2020-10- 2023-10- consultant INDIVIDUEL pour IDA / 59870 Post Consultant Open 23,400.00 0.00 2020-07-17 priority fisheries Implementation 22 04 25 30 30 Responsable Local de la Selection management composante 2 à Nosy be MG-MRHP-182961-CS- Component 2. INDV / Recrutement d'un Individual Strengthening capacities for Under 2020-07- 2020-09- 2020-09- 2020-10- 2023-10- consultant individuel pour IDA / 59870 Post Consultant Open 23,400.00 0.00 2020-07-17 priority fisheries Implementation 22 04 25 30 30 Responsable Local de la Selection management composante 2 à Maintirano MG-MRHP-105671-CS- Component 3. INDV / Mise en place, Strengthening capacities for Individual 2019-03- 2019-05- 2019-05- 2019-07- 2019-12- Formation, Maintenance et IDA / 59870 engaging in alternative Post Consultant Open 60,000.00 0.00 Canceled 2019-03-12 20 14 28 02 29 Entretien du système en fishing practices and Selection ligne ou plateforme livelihoods activities MG-MRHP-119245 BIS2-CS- CDS / Recrutement d'un BE Component 2. pour le Contrôle et Strengthening capacities for Pending 2020-10- 2021-01- 2022-06- IDA / 59870 Post Direct Selection Direct 34,500.00 0.00 2020-10-05 surveillance des travaux de priority fisheries Implementation 26 24 23 construction des CIRRHP management Ambanja, Ambilobe, MG-MRHP-119248-CS- Component 2. Individual 2019-11- 2019-10- 2019-11- 2020-01- 2020-07- INDV / Consultance et appui IDA / 59870 Strengthening capacities for Post Consultant Open 30,600.00 0.00 Canceled 2019-07-01 05 14 13 27 25 à la composante 2 priority fisheries Selection management MG-MRHP-119241-CS- INDV / Assistance juridique Component 2. Individual pour appuyer à Strengthening capacities for 2019-08- 2019-10- 2019-11- 2020-01- 2020-07- IDA / 59870 Post Consultant Open 10,000.00 0.00 Canceled 2019-08-01 l’homologation du Dinabe priority fisheries 19 30 29 28 26 Selection régissant la gestion locale management des pêcheries au niveau de la Baie d'Antongil MG-MRHP-148888-CS- INDV / Recrutement d’un consultant national pour Component 2. assurer le renforcement de Individual Strengthening capacities for Pending 2020-09- 2020-10- 2020-10- 2020-10- capacité des agents de IDA / 59870 Post Consultant Limited 1,000.00 0.00 2020-09-24 priority fisheries Implementation 30 07 17 31 l’administration des pêches Selection management et des responsables des textes administratifs en technique d'approche et d’animation rurale (2.1.1.1.04) MG-MRHP-189680-CS- Component 4. Project Individual INDV / Recrutement d'un (e) 2020-10- 2020-10- 2020-10- 2023-10- IDA / 59870 management and Post Consultant Open 15,000.00 0.00 Canceled 2020-09-15 secrétaire en passation des 09 19 23 23 coordination Selection marchés du projet SWIOFish2 MG-MRHP-160194-CS- Component 4. Project Individual INDV / Recrutement d'un 2020-02- 2020-03- 2020-04- 2020-04- 2023-04- IDA / 59870 management and Post Consultant Open 20,000.00 0.00 Canceled 2020-02-27 assistant en passation des 25 22 01 05 05 coordination Selection marchés de l'UGP-SWIOFish2 MG-MRHP-197771-CS- INDV / Recrutement d'un Component 4. Project Individual Under 2020-10- 2020-11- 2020-11- 2020-12- 2023-09- Consultant individuel IDA / 59870 management and Post Consultant Open 21,000.00 0.00 2020-10-13 Implementation 20 16 22 03 03 Assistant en Passation des coordination Selection Marchés de l'UGP SWIOFish2 MG-MRHP-197821-CS- INDV / Recrutement d'un Component 4. Project Individual Under 2020-10- 2020-10- 2020-11- 2020-11- 2023-09- Consultant individuel IDA / 59870 management and Post Consultant Limited 11,900.00 0.00 2020-10-13 Implementation 13 23 06 22 21 Secrétaire de la Passation coordination Selection des Marchés de l'UGP SWIOFish2 MG-MRHP-197817-CS- INDV / Recrutement d'un Component 4. Project Individual Under 2020-11- 2020-11- 2020-11- 2020-12- 2023-09- Consultant individuel IDA / 59870 management and Post Consultant Open 21,000.00 0.00 2020-10-13 Implementation 16 16 22 05 05 Gestionnaire de contrats de coordination Selection l'UGP SWIOFish2 MG-MRHP-203594-CS- Component 2. INDV / Recrutement d'un Individual Strengthening capacities for Under 2020-11- 2021-01- 2021-01- 2021-02- 2024-02- consultant individuel pour IDA / 59870 Post Consultant Open 23,400.00 0.00 2020-11-20 priority fisheries Implementation 21 01 22 05 05 Responsable Local de la Selection management composante 2 à Mananara Nord MG-MRHP-203595-CS- Component 2. INDV / Recrutement d'un Individual Strengthening capacities for Under 2020-11- 2021-01- 2021-01- 2021-02- 2024-02- consultant individuel pour IDA / 59870 Post Consultant Open 23,400.00 0.00 2020-11-20 priority fisheries Implementation 21 01 22 05 05 Responsable Local de la Selection management composante 2 à Maroantsetra MG-MRHP-203596-CS- Component 3. INDV / Recrutement d'un Strengthening capacities for Individual Under 2020-11- 2020-11- 2020-12- 2021-01- 2023-09- consultant individuel pour IDA / 59870 engaging in alternative Post Consultant Limited 23,400.00 0.00 2020-11-20 Implementation 21 25 16 20 23 Responsable Local de la fishing practices and Selection Composante 3 à Maintirano livelihoods activities MG-MRHP-203597-CS- Component 3. INDV / Recrutement des Strengthening capacities for Individual consultants individuels pour Under 2020-11- 2021-01- 2021-01- 2021-02- 2023-09- IDA / 59870 engaging in alternative Post Consultant Open 46,800.00 0.00 2020-11-20 Responsable Local de la Implementation 21 01 22 12 23 fishing practices and Selection Composante 3 à livelihoods activities Maroantsetra et Nosy Be MG-MRHP-28348-CS- Component 4. Project Individual INDV/MG-PM-44 / Pending 2021-08- 2021-08- 2021-10- 2022-04- IDA / 59870 management and Post Consultant Open 8,000.00 0.00 2021-06-03 Réalisation du Bulletin Implementation 07 28 09 07 coordination Selection trimestriel SWIOFish2 MG-MRHP-119281-CS-CDS Component 2. / Contrôle et surveillance Strengthening capacities for Pending 2021-06- 2021-10- 2022-04- des constructions de IDA / 59870 Post Direct Selection Direct 60,000.00 0.00 2021-04-30 priority fisheries Implementation 29 27 25 marchés couverts aux management produits halieutiques MG-MRHP-119280-CS-CDS Component 3. / Contrôle et surveillance Strengthening capacities for Pending 2022-01- 2022-04- 2022-10- IDA / 59870 Post Direct Selection Direct 70,000.00 0.00 2021-11-12 des constructions de petites engaging in alternative Implementation 26 26 23 débarcadères type ponton fishing practices and livelihoods activities MG-MRHP-189660-CS- INDV / Recrutement d'un consultant individuel pour le Component 2. Individual renforcement de capacités Strengthening capacities for Pending 2021-08- 2021-08- 2021-09- 2021-09- IDA / 59870 Post Consultant Open 4,000.00 0.00 2021-07-03 de l'équipe du service priority fisheries Implementation 08 29 12 24 Selection personnel du secteur pêche management et aquaculture en gestion des ressources humaines Page 13 MG-MRHP-119282-CS-CDS / Contrôle et surveillance des constructions de Component 3. hangars avec des materiaux Strengthening capacities for locaux pour entretenir les Pending 2022-01- 2022-05- 2022-11- IDA / 59870 engaging in alternative Post Direct Selection Direct 48,000.00 0.00 2021-11-12 moteurs, les embarcations et Implementation 11 11 07 fishing practices and des engins de pêche livelihoods activities autorisés et d'une base de réunion, sensibilisation et de structuration des utilisateurs petites infrastru MG-MRHP-119285-CS-CDS Component 3. / Contrôles et surveillances Strengthening capacities for Pending 2022-01- 2022-05- 2022-11- des infrastructures IDA / 59870 engaging in alternative Post Direct Selection Direct 60,000.00 0.00 2021-11-30 Implementation 29 14 10 d'électrification hors grille fishing practices and dans les communautés livelihoods activities pilotes MG-MRHP-28325-CS- Component 3. INDV//MG-PM-29 / Strengthening capacities for Individual Pending 2021-12- 2022-01- 2022-03- 2022-09- Élaboration de plan de IDA / 59870 engaging in alternative Post Consultant Open 30,000.00 0.00 2021-08-27 Implementation 25 24 25 21 formation des cadres et élus fishing practices and Selection au niveau local livelihoods activities MG-MRHP-119283-CS-CDS Component 3. / Contrôles et surveillances Strengthening capacities for des constructions Pending 2022-01- 2022-04- 2022-10- IDA / 59870 engaging in alternative Post Direct Selection Direct 120,000.00 0.00 2021-11-12 d'infrastructures Implementation 11 26 23 fishing practices and communautaires livelihoods activities /communales MG-MRHP-190572-CS- INDV / Recrutement d'un consultant individuel pour le Component 2. renforcement de capacités Individual Strengthening capacities for Pending 2021-06- 2021-06- 2021-07- 2021-08- des agents de IDA / 59870 Post Consultant Open 4,000.00 0.00 2021-05-03 priority fisheries Implementation 08 29 13 09 l'administration en Selection management développement d'application web sous HTML, CSS et JavaScript et pratique de développement en WEBDEV MG-MRHP-223821-CS-CDS / Recrutement d'un BE pour ET, PGES, C&S de travaux de construction de la clôture de Component 2. l’enceinte et mise en place Strengthening capacities for Under 2021-03- 2021-03- 2021-03- 2021-05- 2021-07- IDA / 59870 Post Direct Selection Direct 40,000.00 0.00 2021-03-16 d’un point d’eau autonome priority fisheries Implementation 14 26 26 30 29 du bureau de la CirAEP management Maroantsetra, construction du Hangar et bureau de la brigade CSP Analanjirofo MG-MRHP-223828-CS- Component 4. Project Individual INDV / Recrutement d’un Under 2021-03- 2021-04- 2021-04- 2021-04- 2023-09- IDA / 59870 management and Post Consultant Open 15,600.00 0.00 2021-03-30 troisième Comptable pour Implementation 26 20 22 26 29 coordination Selection l’Unité de Gestion du Projet SWIOFish2 MG-MRHP-227230-CS- Component 4. Project Individual Under 2021-04- 2021-05- 2021-06- 2021-07- 2021-10- INDV / Recrutement d'un IDA / 59870 management and Post Consultant Open 15,000.00 0.00 2021-04-07 Implementation 09 26 16 21 19 SIGiste au niveau de l'UGP coordination Selection SWIOFish2 MG-MRHP-229415-CS-CDS Component 4. Project / Recrutement d'un Under 2021-05- 2021-04- 2021-05- 2023-09- IDA / 59870 management and Post Direct Selection 52,600.00 0.00 2021-04-22 responsable en passation Implementation 23 28 15 29 coordination des marchés du projet SWIOFish2 MG-MRHP-229418-CS- INDV / Recrutement d'un Component 4. Project Individual Under 2021-04- 2021-05- 2021-05- 2023-09- Consultant individuel IDA / 59870 management and Post Consultant Limited 52,000.00 0.00 2021-04-22 Implementation 29 06 15 29 Gestionnaire de contrats de coordination Selection l'UGP SWIOFish2 (2021) MG-MRHP-161616-CS-CDS Component 2. / Recrutement d'un BE pour Strengthening capacities for 2020-03- 2020-03- 2020-05- 2020-05- 2021-10- le contrôle et surveillance IDA / 59870 Post Direct Selection Direct 41,500.00 0.00 Canceled 2020-03-12 priority fisheries 20 22 26 26 23 des travaux des DRAEP à management Androy, Anosy et Atsimo Atsinanana MG-MRHP-161621-CS-CDS / Recrutement d'un BE pour Component 2. le contrôle et la surveillance Strengthening capacities for 2020-03- 2020-03- 2020-05- 2020-05- 2021-10- IDA / 59870 Post Direct Selection Direct 51,000.00 0.00 Canceled 2020-03-13 des travaux du DRAEP et priority fisheries 20 23 26 27 24 CIRAEP à Maintirano, des management CIRAEP à Besalampy et à Masoarivo MG-MRHP-231606-CS- INDV / Recrutement Component 2. Individual consultant individuel pour Strengthening capacities for Under 2021-05- 2021-07- 2021-07- 2021-09- 2022-09- IDA / D1720 Post Consultant Open 15,000.00 0.00 2021-05-20 développement de Base des priority fisheries Implementation 07 08 29 02 02 Selection Donnés du Centre de management Surveillance Pêche (CSP) Page 14 PROCUREMENT PLAN – PROJECT PREPARATION FACILITY Project information: Lao PDR Civil Registration and Vital Statistics Project (P167601) Project Implementation agency: Ministry of Home Affairs (MOHA) Date of the Procurement Plan: January 14, 2019 Period covered by this Procurement Plan: January 2019 – December 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in with the national regulations including the Procurement Decree #03, dated January 9, 2004 and Implementation Rule and Regulations (IRR) #0063 issued by the Ministry of Finance (MOF) on March 12, 2004 and #0861/MOF, dated May 5, 2009 (amended version), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. 1. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; 2. Information related to award of contract including reasons for rejection of unsuccessful bidders shall be published on the implementing agency websites and/or newspaper of wide circulation. 3. All complaints on procurement related matters including complaints arising from procurement under Bank financed Projects whilst using National Procurement Procedures shall be dealt with in accordance with Article 33 of the Procurement Decree. Borrower shall put in place an effective complaints review mechanism for dealing with procurement related complaints and shall disclose the details in all the bidding documents. All complaints shall be recorded by the Borrower in the 1 appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Other Relevant Procurement Information – none Method and Prior Review Thresholds: Lao Open (USD) Prior Internation National RFQ Comments Review al (Shopping Threshold ) (USD mil) Goods, IT 600,000 Below Below Recommended 1.0 and non- & above 600,000 100,000 to advertise for consulting >USD 50,000 services Consulting 200,000 Below N/A 0.3 Firm & above 200,000 Individual 0.2 consultant 2 PROCUREMENT Lao People's Democratic Republic : Lao People’s Democratic Republic Civil Registration and Vital Statistics Project PLAN General Information Country: Lao People's Democratic Republic Bank’s Approval Date of the Original Procurement Plan: 2019-01-14 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167601 GPN Date: 2019-09-09 Project Name: Lao People’s Democratic Republic Civil Registration and Vital Statistics Project Loan / Credit No: / , IDA / V2500, IDA / 65700 M Executing Agency(ies): inistry of Home Affairs, Department of Citizen Management WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned C3-W001 / Renovation of Component 3: Project Request for Single Stage - One 2020-07- National Programme IDA / V2500 Post Limited 10,000.00 12,150.87 Completed 2019-12-06 2020-02-26 2020-01-31 2020-05-05 Management Quotations Envelope 29 Coordinator Office (NPCO) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C3/G044 / 2 vehicles one Component 3: Project Request for Single Stage - One SUV and one double cap pick- / Post Open - National 70,000.00 0.00 Canceled 2019-05-22 2019-07-17 2020-01-13 Management Quotations Envelope up Component 3: Project Request for Single Stage - One C3/G09 / Refrigerator / Post Limited 1,000.00 0.00 Canceled 2019-01-26 2019-03-23 2019-09-19 Management Quotations Envelope C3/G04 / Office Furniture Component 3: Project Request for Single Stage - One IDA / V2500 Post Limited 15,000.00 9,939.19 Completed 2019-05-22 2020-02-26 2019-07-17 2020-05-25 2020-01-13 2020-07-07 (for office and training room) Management Quotations Envelope C3/G01 / Partitioning and Component 3: Project Request for Single Stage - One IDA / V2500 Post Limited 15,000.00 0.00 Canceled 2019-05-22 2019-07-17 2020-01-13 painting of office Management Quotations Envelope C3/G03 / ICT Equipment (2 desktop, 12 laptop computers, 4G wireless dongle or equivalent for use Component 3: Project Request for Single Stage - One IDA / V2500 Post Limited 45,000.00 43,072.88 Completed 2019-01-26 2019-10-02 2019-03-23 2019-11-21 2019-09-19 2019-12-13 with the Field Systems, Two Management Quotations Envelope multi-function laser printers (scan, print, and copy)), 2 LCD monitors C3/G013 / Accounting Component 3: Project Request for Single Stage - One IDA / V2500 Post Limited 25,000.00 12,735.74 Signed 2019-01-26 2020-11-17 2019-03-23 2020-12-28 2019-09-19 Software Management Quotations Envelope C3-G-006 / Motorcycles for Component 3: Project Single Stage - One IDA / V2500 Post Request for Bids Open - National 592,000.00 331,150.80 Completed 2020-02-02 2020-07-03 2020-02-07 2020-07-15 2020-03-20 2020-08-11 2020-04-19 2020-08-25 2020-05-24 2020-09-24 2020-11-20 2021-02-24 DoHA Management Envelope Component 3: Project Single Stage - One C3-G-007 / Project Vehicles IDA / V2500 Post Request for Bids Open - National 308,000.00 310,485.42 Completed 2020-03-01 2020-06-24 2020-03-06 2020-07-15 2020-04-17 2020-07-30 2020-05-17 2020-08-11 2020-06-21 2020-09-17 2020-12-18 2021-02-24 Management Envelope C1-G-009 / Civil Component 1: Strengthening Under Management information Single Stage - One IDA / V2500 the Provision and Use of Civil Prior Request for Bids Open - International 5,000,000.00 0.00 Implementati 2020-03-15 2020-10-21 2020-03-20 2020-10-29 2020-05-01 2020-12-15 2020-05-31 2020-07-05 2021-01-01 system (IS) software Envelope Registration Services on implementation C3-G-008 / IT Equipment for Component 3: Project Request for Single Stage - One IDA / V2500 Post Limited 35,000.00 38,461.65 Completed 2020-03-01 2020-11-17 2020-04-26 2021-01-26 2020-10-23 2021-05-26 Training Management Quotations Envelope Component 1: Strengthening Pending C1-G-008 / Printer ink Request for Single Stage - One IDA / V2500 the Provision and Use of Civil Post Open - National 10,000.00 0.00 Implementati 2020-03-22 2020-05-17 2020-11-13 cartridges Quotations Envelope Registration Services on Component 1: Strengthening Pending C1-G-003 / Generators for Single Stage - One IDA / V2500 the Provision and Use of Civil Post Request for Bids Open - National 200,000.00 0.00 Implementati 2022-07-20 2022-07-25 2022-09-05 2022-10-05 2022-11-09 2023-05-08 PoHA & DoHA Envelope Registration Services on Component 1: Strengthening Pending C1-G-006 / Secure paper for Request for Single Stage - One IDA / V2500 the Provision and Use of Civil Post Open - National 50,000.00 0.00 Implementati 2021-10-05 2021-11-30 2022-05-29 official certificates Quotations Envelope Registration Services on Component 1: Strengthening Pending C1-G-007 / Printing Request for Single Stage - One IDA / V2500 the Provision and Use of Civil Post Open - National 20,000.00 0.00 Implementati 2021-04-04 2021-05-30 2021-11-26 Registration books Quotations Envelope Registration Services on C1-G011 / Printing of Component 1: Strengthening Request for Single Stage - One Regulations & Training IDA / 65700 the Provision and Use of Civil Post Open - National 20,000.00 3,810.50 Signed 2021-02-03 2021-02-05 2021-03-31 2021-03-31 2021-09-27 Quotations Envelope materials Registration Services Component 1: Strengthening Pending C1-G013 / Village Loud Request for Single Stage - One IDA / 65700 the Provision and Use of Civil Post Open - National 8,100.00 0.00 Implementati 2021-01-25 2021-03-22 2021-09-18 Speaker Quotations Envelope Registration Services on C1-G-002 / IT Equipment for Component 1: Strengthening Single Stage - One PoHA & DoHA IDA / V2500 the Provision and Use of Civil Prior Request for Bids Open - International 2,865,000.00 0.00 Canceled 2021-01-01 2021-01-06 2021-02-17 2021-03-19 2021-04-23 2021-10-20 Envelope (User Device) Registration Services Component 1: Strengthening C1-G014 / Publication and Request for Single Stage - One IDA / 65700 the Provision and Use of Civil Post Open - National 40,000.00 0.00 Canceled 2021-05-30 2021-07-25 2022-01-21 Printing Quotations Envelope Registration Services Component 1: Strengthening Pending C1-G020 / Printing Training Request for Single Stage - One IDA / 65700 the Provision and Use of Civil Post Open - National 15,000.00 0.00 Implementati 2021-07-04 2021-08-29 2022-02-25 materials for CR Team Quotations Envelope Registration Services on Page 1 C1-G021 / Printing of SBCC Component 1: Strengthening Pending Request for Single Stage - One and Job Aids - A tool or IDA / 65700 the Provision and Use of Civil Post Open - National 20,000.00 0.00 Implementati 2021-07-31 2021-09-25 2022-03-24 Quotations Envelope Instruction for SBCC Trainers Registration Services on C1-G022 / Printing of birth & Component 1: Strengthening Pending death notification/ Request for Single Stage - One IDA / 65700 the Provision and Use of Civil Post Open - National 20,000.00 0.00 Implementati 2021-07-02 2021-08-27 2022-02-23 registration form and Quotations Envelope Registration Services on certificate C3-G-010 / 20 Computers Component 1: Strengthening Pending Request for Single Stage - One for NPCO and POHA IDA / 65700 the Provision and Use of Civil Post Open - National 35,000.00 0.00 Implementati 2021-07-04 2021-08-29 2022-02-25 Quotations Envelope Accountants Registration Services on Component 1: Strengthening Pending C1-G015 / IT Equipment for Single Stage - One IDA / 65700 the Provision and Use of Civil Post Request for Bids Open - National 100,000.00 0.00 Implementati 2021-07-04 2021-07-09 2021-09-03 2021-10-03 2021-11-07 2022-05-06 DCM-MoHA Envelope Registration Services on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2-G-001 / Firm to conduct Component 2: Monitoring Request for Single Stage - One baseline household survey - IDA / V2500 Post Open - National 100,000.00 99,355.34 Completed 2020-03-01 2020-04-26 2020-07-06 2020-10-23 2020-10-06 and Impact Evaluation Quotations Envelope data collection C1-G012 / Design of Printing Component 1: Strengthening Pending Request for Single Stage - One and other communication IDA / 65700 the Provision and Use of Civil Post Open - National 15,000.00 0.00 Implementati 2021-04-04 2021-05-30 2021-11-26 Quotations Envelope materials Registration Services on Pending C3-G-009 / Firm Translation Component 3: Project Request for Single Stage - One IDA / 65700 Post Open - National 20,000.00 0.00 Implementati 2021-05-02 2021-06-27 2021-12-24 document into Lao Language Management Quotations Envelope on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1/C004 / Social and Component 3: Project Quality And Cost- Behavior Change / Prior Open - International 920,000.00 0.00 Canceled 2019-05-17 2019-05-08 2019-06-07 2019-07-21 2019-08-18 2019-09-17 2019-10-22 2019-11-26 2020-11-25 Management Based Selection Communication Firm Consultant C1/C003 / CMIS Component 3: Project / Post Qualification Open - International 260,000.00 0.00 Canceled 2019-05-17 2019-06-07 2019-07-21 2019-08-20 2019-09-24 2020-03-22 Implementation Advisory Firm Management Selection Consultant C3-C-008 / External Project Component 3: Project IDA / V2500 Post Qualification Open - National 75,000.00 72,688.00 Signed 2020-01-20 2020-04-04 2020-02-10 2020-03-25 2020-11-04 2020-04-24 2021-01-21 2020-05-29 2021-02-03 2020-11-25 Audit Management Selection C1/C002 / Frim for Consultant translation of CMIS software Component 3: Project IDA / 65700 Post Qualification Open - National 35,000.00 0.00 Canceled 2019-05-17 2019-06-07 2019-07-21 2019-08-20 2019-09-24 2020-03-22 documentation into Lao Management Selection language INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual C3/C001 / National Project Component 3: Project IDA / V2500 Post Consultant Open 132,000.00 63,000.00 Signed 2019-05-17 2019-05-29 2019-07-05 2019-08-12 2019-07-26 2019-08-25 2019-08-30 2019-08-30 2020-02-26 advisor Management Selection Individual C3/C003 / National Component 3: Project IDA / V2500 Post Consultant Open 99,000.00 9,600.00 Signed 2019-05-17 2019-05-03 2019-07-05 2019-08-12 2019-07-26 2019-09-03 2019-08-30 2019-09-30 2020-02-26 procurement officer Management Selection Individual C3/C005 / Financial Component 3: Project IDA / V2500 Post Consultant Open 99,000.00 10,800.00 Completed 2019-05-17 2019-05-02 2019-07-05 2019-08-13 2019-07-26 2019-09-03 2019-08-30 2019-09-30 2020-02-26 2020-06-30 Management Officer Management Selection C3/C006 / Citizen Individual Component 3: Project Engagement/Communications / Post Consultant Open 66,000.00 0.00 Canceled 2019-05-14 2019-05-03 2019-07-02 2019-07-23 2019-08-27 2020-02-23 Management Officer Selection Individual Component 3: Project C3/C008 / SBCC Officer / Post Consultant Open 66,000.00 0.00 Canceled 2019-05-17 2019-05-03 2019-07-05 2019-07-26 2019-08-30 2020-02-26 Management Selection Individual C3/C002 / Project Component 3: Project IDA / V2500 Post Consultant Open 130,000.00 12,500.00 Terminated 2019-05-17 2019-05-27 2019-07-05 2019-08-13 2019-07-26 2019-08-19 2019-08-30 2019-08-30 2020-02-26 Coordinator Management Selection C1/C001 / CMIS software Component 3: Project Test System Configuration & IDA / V2500 Post Direct Selection Direct 58,000.00 57,575.00 Signed 2019-05-17 2019-11-27 2019-05-27 2019-12-03 2019-07-31 2019-05-30 2020-01-27 Management Deployment C3/C009 / short-term Component 1: Strengthening Individual Enterprise Architect IDA / V2500 the Provision and Use of Civil Post Consultant Open 4,000.00 4,000.00 Completed 2019-07-01 2019-06-21 2019-08-19 2019-08-01 2019-09-09 2019-08-06 2019-10-14 2019-08-05 2020-04-11 2019-12-06 consultant Registration Services Selection C3/C010 / short-term Component 1: Strengthening Individual software public administration IDA / V2500 the Provision and Use of Civil Post Consultant Open 4,000.00 0.00 Canceled 2019-07-01 2019-06-27 2019-08-19 2019-09-09 2019-10-14 2020-04-11 expert Registration Services Selection Page 2 C3/C011 / International Component 1: Strengthening Individual Advisor Social and behavior IDA / V2500 the Provision and Use of Civil Post Consultant Open 96,000.00 30,300.00 Signed 2019-09-16 2019-09-20 2019-11-04 2020-04-11 2019-11-25 2020-05-14 2019-12-30 2020-05-19 2020-06-27 change communication (SBCC) Registration Services Selection for civil registration C3/C012 / National Project Individual Component 2: Monitoring Under Statistician/Monitoring and IDA / V2500 Post Consultant Open 120,000.00 0.00 2019-09-16 2019-09-20 2019-11-04 2019-11-25 2019-12-30 2020-06-27 and Impact Evaluation Implementation Evaluation Officer Selection Individual C3/C013 / National Project Component 3: Project IDA / V2500 Post Consultant Open 90,000.00 3,850.00 Signed 2019-09-16 2019-11-04 2019-11-04 2020-01-15 2019-11-25 2020-01-22 2019-12-30 2020-01-31 2020-06-27 Operations Officer Management Selection Component 1: Strengthening Individual C1-IC-014 / National IT IDA / V2500 the Provision and Use of Civil Post Consultant Open 120,000.00 24,300.00 Signed 2019-11-04 2019-11-07 2019-12-23 2020-01-08 2020-01-13 2020-02-26 2020-02-17 2020-03-02 2020-08-15 Advisor Registration Services Selection Component 1: Strengthening C1-SSS-001 / Software IDA / V2500 the Provision and Use of Civil Prior Direct Selection Direct 1,100,000.00 0.00 Canceled 2019-11-04 2019-11-27 2019-11-14 2019-11-29 2020-01-18 2020-07-16 vendor consulting services Registration Services C3/C004 / Short-term Component 3: Project International Procurement IDA / V2500 Post Direct Selection Direct 30,000.00 50,860.00 Signed 2019-12-25 2019-12-18 2020-01-04 2019-11-21 2020-03-09 2020-01-11 2020-09-05 Management Specialist for CMIS C3-C-015 / short-term Individual Component 3: Project International Enterprise IDA / V2500 Post Consultant Open 60,000.00 120,000.00 Signed 2020-02-14 2020-02-10 2020-04-03 2020-05-18 2020-04-24 2020-05-28 2020-05-29 2020-06-01 2020-11-25 Management Architect consultant Selection Individual C3-C016 / National Financial Component 3: Project IDA / 65700 Post Consultant Open 30,000.00 30,000.00 Signed 2020-06-02 2020-06-05 2020-07-21 2020-06-25 2020-08-11 2020-06-25 2020-09-15 2020-07-01 2021-03-14 Management Officer Management Selection Individual C3-C017 / National Project Component 3: Project IDA / 65700 Post Consultant Open 18,000.00 19,200.00 Terminated 2020-06-05 2020-06-05 2020-07-24 2020-06-23 2020-08-14 2020-06-23 2020-09-18 2020-07-01 2021-03-17 Accountant Management Selection Individual C3-C-016 / CMIS Training Component 3: Project IDA / V2500 Post Consultant Open 100,000.00 0.00 Canceled 2019-12-20 2019-11-30 2020-02-07 2020-02-28 2020-04-03 2020-09-30 Specialist Management Selection Individual C3-C-018 / National Project Component 3: Project IDA / 65700 Post Consultant Open 20,000.00 4,200.00 Signed 2021-01-29 2021-01-04 2021-03-19 2021-02-09 2021-04-09 2021-02-22 2021-05-14 2021-03-01 2021-11-10 Accountant Management Selection Component 1: Strengthening Individual C1-C-019 / National IT Pending IDA / 65700 the Provision and Use of Civil Post Consultant Open 30,000.00 0.00 2021-06-29 2021-08-17 2021-09-07 2021-10-12 2022-04-10 Officer Implementation Registration Services Selection Component 1: Strengthening Individual C1-SSS-002 / Local SBCC Under IDA / 65700 the Provision and Use of Civil Post Consultant Direct 15,000.00 0.00 2021-05-31 2021-06-10 2021-06-10 2021-07-01 2021-08-05 2022-02-01 Advisor Implementation Registration Services Selection Page 3 PROCUREMENT PLAN (Textual Part) Project information: Belarus Emergency COVID-19 Response Project P173828) Project Implementation agency: Government Institution Republican Scientific and Practical Center for Medical Technologies, Informatization, Management and Economics of Health (RSPC MT) Date of the Procurement Plan: 08 May 2020 Period covered by this Procurement Plan: 2020 – 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in accordance with the legislation of the Republic of Belarus, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): Goods: not applicable; Works: not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable: this possibility is still under discussion. Other Relevant Procurement Information. Taking into account the emergency circumstances and the time limitation, it’s planning to apply the Direct selection methods for the following contractors: 1. UN Agencies. It’s allowable a serious time and cost saving with a risk decreasing basing on their considerable cooperation experience with a wide range of the World leading manufacturers, their long-term relationships and well-managed supplies arrangement. 2. Manufacturing Trading Republican Unitary Enterprise “Belmedtekhnika”. In spite of the fact that it’s under control of the Ministry of Health of the Republic of Belarus, the reasons of “Belmedtekhnika” selection are: - their vast experience of supplying of a wide range of medical accessories to a lot of Belarusian customers; - efficient logistic arrangement inside the Republic of Belarus (network of warehouses, etc.); - long-term experience of Customs clearance of wide assortment of medical devices/accessories. 3. Belarusian local manufacturers of medical accessories: individual protection equipment, etc. Proximity of their manufacturing base to the Belarusian market provides the possibility of considerable time and logistic costs decreasing. With a purpose of the procurement procedures term decreasing, the following deviations of the standard threshold amounts for the following procurement methods for the Goods and Non-consulting services Procurement: - in respect of contracts for more than 5 million US dollars per a contract, an International Market approach option for RFB procurement procedure; - in respect of contracts for less than 5 million US dollars per a contract, a National Market approach option for RFB procurement procedure; - for contracts of less than 1 million US dollars per a contract for RFQ procurement procedure; Besides, with a purpose of the procurement process acceleration, Bid preparation period may be decreased down to 15 business days for RFB and to 5 business days for RFQ, depending on cost and sophistication of the procurement subject and the Bidders potential; Standstill Period is not applicable for the Project. PROCUREMENT Belarus : Belarus Emergency COVID-19 Response Project PLAN General Information Country: Belarus Bank’s Approval Date of the Original Procurement Plan: 2020-06-05 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173828 GPN Date: 2020-05-22 Project Name: Belarus Emergency COVID-19 Response Project Loan / Credit No: IBRD / 91170, / B Executing Agency(ies): elarus Health System Modernization Implementation Department of RNPC MT WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Emergency COVID-19 G1.32 / Favipiravir, tablets of UN Agencies IBRD / 91170 Measures and Rapid Post Direct 0.10 0.00 Canceled 2020-07-14 2020-07-16 2020-07-27 2020-08-25 200 mg, 15 200 tabl. (Direct) Emergency Response Emergency COVID-19 G1.2 / Medical face mask, IBRD / 91170 Measures and Rapid Post Direct Selection Direct 253,000.00 0.00 Canceled 2020-07-10 2020-07-13 2020-07-24 2020-09-22 1000000 pcs Emergency Response G1.8 / Medical test kit for the Emergency COVID-19 COVID-19 detection, 100000 / Measures and Rapid Post Direct Selection Direct 261,000.00 0.00 Canceled 2020-07-10 2020-07-13 2020-07-28 2020-09-24 pcs Emergency Response Emergency COVID-19 G1.73 / 64-slice Computer IBRD / 91170 Measures and Rapid Post Direct Selection Direct 4,575,569.00 4,120,366.25 Signed 2020-10-20 2020-11-09 2020-10-25 2020-11-09 2020-10-31 2020-12-07 2020-12-31 tomograph, 13 pcs Emergency Response Emergency COVID-19 G1.74 / 128-slice Computer IBRD / 91170 Measures and Rapid Post Direct Selection Direct 7,827,600.00 4,726,800.00 Signed 2020-10-20 2020-11-11 2020-10-25 2020-11-11 2020-10-31 2020-12-16 2020-12-31 tomograph, 12 pcs Emergency Response Emergency COVID-19 G1.51 / Computer IBRD / 91170 Measures and Rapid Post Direct Selection Direct 8,525,000.00 0.00 Canceled 2020-07-10 2020-07-13 2020-07-21 2020-09-17 tomograph, 20 pcs Emergency Response Emergency COVID-19 G1.11 / Syringe dosing IBRD / 91170 Measures and Rapid Post Direct Selection Direct 1,089,000.00 1,064,308.04 Completed 2020-10-20 2020-10-26 2020-10-21 2020-10-26 2020-10-31 2020-12-01 2020-12-31 2021-02-10 device, 1500 pcs Emergency Response Emergency COVID-19 G1.14 / Oxygen inhaler, IBRD / 91170 Measures and Rapid Post Direct Selection Direct 2,570,000.00 249,354.00 Completed 2020-10-20 2020-11-06 2020-10-21 2020-11-06 2020-10-31 2020-11-20 2020-11-30 2021-01-22 5000 pcs Emergency Response Emergency COVID-19 G1.7 / Respirator of 2nd UN Agencies / Measures and Rapid Post Direct 46,000.00 0.00 Canceled 2020-07-10 2020-07-13 2020-07-31 2020-09-29 class, 20000 pcs (Direct) Emergency Response Emergency COVID-19 G1.5 / Respirator of 3rd UN Agencies / Measures and Rapid Post Direct 3,146,000.00 0.00 Canceled 2020-07-10 2020-07-12 2020-07-29 2020-09-25 class, 1000000 pcs (Direct) Emergency Response Emergency COVID-19 G1.3 / Medical gloves, / Measures and Rapid Post Direct Selection Direct 121,000.00 0.00 Canceled 2020-07-10 2020-07-15 2020-07-27 2020-09-23 1000000 twins Emergency Response Emergency COVID-19 G1.9 / Pulseoxymetry device, IBRD / 91170 Measures and Rapid Post Direct Selection Direct 490,000.00 0.00 Canceled 2020-07-20 2020-07-23 2020-08-03 2020-08-31 1000 pcs Emergency Response Emergency COVID-19 G1.13 / Oxygen supplying UN Agencies / Measures and Rapid Post Direct 62,000.00 0.00 Canceled 2020-07-10 2020-07-15 2020-08-03 2020-09-30 nasal cannulas, 50000 pcs (Direct) Emergency Response Emergency COVID-19 G 1.13 / Oxygen supplying IBRD / 91170 Measures and Rapid Post Direct Selection Direct 61,600.00 38,242.00 Signed 2020-10-20 2020-11-26 2020-10-25 2020-11-26 2020-10-31 2020-12-29 2020-11-30 nasal cannulas, 50 000 pcs Emergency Response Emergency COVID-19 G1.16 / Closed suction Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 178,000.00 0.00 Canceled 2020-07-25 2020-08-10 2020-09-07 system, 10000 pcs Quotations Envelope Emergency Response Emergency COVID-19 G1.17 / Noninvasive Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 69,000.00 0.00 Canceled 2020-07-25 2020-08-11 2020-09-08 ventilation mask, 600 pcs Quotations Envelope Emergency Response G1.18 / High concentration Emergency COVID-19 Request for Single Stage - One oxygen therapy mask, 2000 IBRD / 91170 Measures and Rapid Post Open - National 124,000.00 0.00 Canceled 2020-07-25 2020-08-12 2020-09-09 Quotations Envelope pcs Emergency Response Emergency COVID-19 G1.20 / Video laryngoscopes, Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 289,000.00 0.00 Canceled 2020-07-25 2020-08-13 2020-09-10 100 pcs Quotations Envelope Emergency Response G1.21 / Adult CPAP high- Emergency COVID-19 Request for Single Stage - One flow therapy device completed IBRD / 91170 Measures and Rapid Post Open - National 707,000.00 0.00 Canceled 2020-08-10 2020-09-02 2021-01-18 Quotations Envelope with cannulas set, 200 pcs Emergency Response Emergency COVID-19 G1.22 / Isolated stretcher, 50 Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 252,000.00 0.00 Canceled 2020-07-25 2020-08-14 2020-09-11 pcs Quotations Envelope Emergency Response Page 1 Emergency COVID-19 G1.26 / Propofol, 1%, 20 ml, UN Agencies IBRD / 91170 Measures and Rapid Post Direct 647,000.00 0.00 Canceled 2020-10-20 2020-10-25 2020-11-30 2020-12-31 700 000 ampuls (Direct) Emergency Response Emergency COVID-19 G1.27 / Midazolam, 0.5%, 3 UN Agencies IBRD / 91170 Measures and Rapid Post Direct 69,000.00 0.00 Canceled 2020-10-20 2020-10-25 2020-11-30 2020-12-31 ml, 50 000 ampuls (Direct) Emergency Response Emergency COVID-19 G1.28 / Phentanyl, 0.005%, 2 UN Agencies IBRD / 91170 Measures and Rapid Post Direct 7,000.00 0.00 Canceled 2020-07-14 2020-07-19 2020-07-27 2020-08-25 ml, 75 000 ampuls (Direct) Emergency Response Emergency COVID-19 G1.29 / Atracurium, 1%. 5 ml, UN Agencies IBRD / 91170 Measures and Rapid Post Direct 75,000.00 0.00 Canceled 2020-07-14 2020-07-19 2020-07-27 2020-08-25 40 000 ampuls (Direct) Emergency Response Emergency COVID-19 G1.30 / Tocilizumab, 400 UN Agencies IBRD / 91170 Measures and Rapid Post Direct 345,400.00 0.00 Canceled 2020-10-20 2020-10-25 2020-11-30 2020-12-31 mg/20 ml vial, 500 vials (Direct) Emergency Response Emergency COVID-19 G1.31 / Remdesivir, 100 mg, UN Agencies IBRD / 91170 Measures and Rapid Post Direct 109,000.00 0.00 Canceled 2020-10-20 2020-10-25 2020-11-30 2020-12-31 1100 vials (Direct) Emergency Response Emergency COVID-19 G1.33 / Methylprednisolone, UN Agencies IBRD / 91170 Measures and Rapid Post Direct 30,000.00 0.00 Canceled 2020-10-20 2020-10-25 2020-11-30 2020-12-31 250 per vial, 6000 vials (Direct) Emergency Response Emergency COVID-19 G1.34 / Ertapenem, 1.0 per a UN Agencies IBRD / 91170 Measures and Rapid Post Direct 291,500.00 0.00 Canceled 2020-10-20 2020-10-25 2020-11-30 2020-12-31 vial, 10000 vials (Direct) Emergency Response Emergency COVID-19 G1.35 / Hydrocortisone, 100 UN Agencies IBRD / 91170 Measures and Rapid Post Direct 30,000.00 0.00 Canceled 2020-07-14 2020-07-19 2020-07-27 2020-08-25 мг, 6000 vials (Direct) Emergency Response Emergency COVID-19 G1.40 / Mobile X-ray unit, 30 IBRD / 91170 Measures and Rapid Post Direct Selection Direct 1,419,000.00 1,194,423.75 Signed 2020-10-20 2020-11-16 2020-10-23 2020-11-16 2020-10-30 2020-12-31 2020-11-30 pcs Emergency Response G1.42 / Portable medical Emergency COVID-19 ventilator of high class of IBRD / 91170 Measures and Rapid Post Direct Selection Direct 547,000.00 0.00 Canceled 2020-09-01 2020-09-22 2020-11-01 2021-06-01 oxygen inhalation and Emergency Response capnography options, 50 pcs G1.43 / Portable plug-in monitor defibrillator of pulseoxymetry option Emergency COVID-19 electrocardiography, non- IBRD / 91170 Measures and Rapid Post Direct Selection Direct 317,000.00 0.00 Canceled 2020-09-01 2020-09-22 2020-11-01 2021-03-01 invasive measurement of Emergency Response arterial tension, pulse generator, electrocardiography, 50 pcs Emergency COVID-19 G1.44 / Syringe pump, 50 IBRD / 91170 Measures and Rapid Post Direct Selection Direct 39,000.00 0.00 Canceled 2020-09-01 2020-09-22 2020-11-01 2021-03-01 pcs Emergency Response Emergency COVID-19 G1.46 / Oxygen UN Agencies IBRD / 91170 Measures and Rapid Post Direct 61,000.00 0.00 Canceled 2020-09-01 2020-09-22 2020-11-01 2021-03-01 concentrator, 50 pcs (Direct) Emergency Response Emergency COVID-19 G1.47 / Electrical suction Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 42,000.00 0.00 Canceled 2020-09-15 2020-11-01 2021-03-01 pump, 50 pcs Quotations Envelope Emergency Response Emergency COVID-19 G1.53 / Portable thoracic Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 26,000.00 0.00 Canceled 2020-09-15 2020-11-01 2021-03-01 suction system, 15 psc Quotations Envelope Emergency Response G1.54 / Cartridges for GeneXpert devices for the Emergency COVID-19 UN Agencies diagnosis of infections not IBRD / 91170 Measures and Rapid Post Direct 306,000.00 0.00 Canceled 2020-10-28 2020-11-25 2021-01-31 2021-05-31 (Direct) related to tuberculosis, 5000 Emergency Response psc G1.55 / Patient convection Emergency COVID-19 UN Agencies heating systems (thermal IBRD / 91170 Measures and Rapid Post 1,023,000.00 0.00 Canceled 2020-10-28 2020-11-18 2021-01-31 2021-04-30 (Direct) blankets), 500 psc Emergency Response Emergency COVID-19 G1.56 / High-tech intensive IBRD / 91170 Measures and Rapid Post Direct Selection Direct 2,928,000.00 0.00 Canceled 2020-07-10 2020-07-13 2020-07-22 2020-09-18 care beds, 500 psc Emergency Response G1.72 / Enoxaparin sodium Emergency COVID-19 (Clexane), solution for UN Agencies IBRD / 91170 Measures and Rapid Post Direct 81,400.00 0.00 Canceled 2020-10-20 2020-10-25 2020-11-29 2020-12-31 injection 8000 IU anti-Xa/0.8 (Direct) Emergency Response ml, 2382 packs G 1.7 / Medical face mask Emergency COVID-19 (biological protection not less IBRD / 91170 Measures and Rapid Post Direct Selection Direct 924,000.00 123,910.94 Completed 2020-12-11 2020-12-08 2020-12-12 2020-12-08 2020-12-31 2020-12-22 2021-02-28 2021-01-14 than 95%) or Respirator 2nd Emergency Response class (type FFP2), 400 000 pcs Emergency COVID-19 G 1.5 / Respirator of 3rd IBRD / 91170 Measures and Rapid Post Direct Selection Direct 786,500.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-02-28 class, 250000 pcs Emergency Response Emergency COVID-19 Under G 1.9 / Pulseoxymetry device, UN Agencies IBRD / 91170 Measures and Rapid Post Direct 19,580.00 2,353.00 Implementati 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 40 pcs (Direct) Emergency Response on Emergency COVID-19 G1.24 / Crash cart, 350 pcs IBRD / 91170 Measures and Rapid Post Direct Selection Direct 978,000.00 895,992.72 Signed 2020-12-10 2020-12-03 2020-12-15 2020-12-03 2020-12-31 2020-12-23 2021-03-31 Emergency Response Page 2 G1.70 / Medical test kit for Emergency COVID-19 the ELISA diagnostics, 200 IBRD / 91170 Measures and Rapid Post Direct Selection Direct 625,000.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-01-31 064 pcs Emergency Response Emergency COVID-19 G1.1 / Single-use protective IBRD / 91170 Measures and Rapid Post Direct Selection Direct 2,750,000.00 0.00 Canceled 2020-07-10 2020-07-15 2020-07-23 2020-09-21 suit, 980000 pcs Emergency Response Emergency COVID-19 Under G1.71 / Express medical test IBRD / 91170 Measures and Rapid Post Direct Selection Direct 319,000.00 0.00 Implementati 2020-12-10 2021-03-12 2020-12-15 2020-11-06 2020-12-31 2021-01-31 kit, 90000 pcs Emergency Response on Emergency COVID-19 Under G 1.1 / Single-use protective Request for Single Stage - One IBRD / 91170 Measures and Rapid Prior Open - National 2,750,000.00 0.00 Implementati 2021-02-23 2021-05-26 2021-03-31 2021-05-31 suit, 980000 pcs Quotations Envelope Emergency Response on Emergency COVID-19 Under G.1.5 / Respirator of 3rd Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 786,500.00 0.00 Implementati 2021-02-23 2021-03-31 2021-05-31 class, 250000 pcs Quotations Envelope Emergency Response on Emergency COVID-19 G1.10 / Acid-base balance UN Agencies IBRD / 91170 Measures and Rapid Post Direct 550,000.00 0.00 Canceled 2020-07-20 2021-01-26 2020-07-22 2021-01-29 2020-08-04 2020-09-29 analyzer, 70 pcs (Direct) Emergency Response Emergency COVID-19 G1.12 / Portable medical UN Agencies IBRD / 91170 Measures and Rapid Post Direct 1,100,000.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-11 2021-01-29 2021-02-09 2021-04-30 ventilator, 140 pcs (Direct) Emergency Response G 1.18 / High concentration Emergency COVID-19 UN Agencies oxygen therapy mask, 2000 IBRD / 91170 Measures and Rapid Post Direct 11,000.00 0.00 Canceled 2020-10-19 2021-01-26 2020-10-24 2021-01-29 2020-11-28 2020-12-31 (Direct) pcs Emergency Response Emergency COVID-19 G 1.20 / Video UN Agencies IBRD / 91170 Measures and Rapid Post Direct 440,000.00 0.00 Canceled 2020-12-17 2021-01-26 2020-12-22 2021-01-29 2020-12-31 2021-02-28 laryngoscopes, 250 pcs (Direct) Emergency Response Emergency COVID-19 G 1.22 / Isolated stretcher, UN Agencies IBRD / 91170 Measures and Rapid Post Direct 180,000.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 50 pcs (Direct) Emergency Response Emergency COVID-19 G1.37 / Medical ventilator of UN Agencies IBRD / 91170 Measures and Rapid Post Direct 6,106,100.00 0.00 Canceled 2020-12-17 2021-01-26 2020-12-19 2021-01-29 2020-12-31 2021-02-28 enhanced options, 350 pcs (Direct) Emergency Response Emergency COVID-19 G 1.56 / High-tech intensive UN Agencies IBRD / 91170 Measures and Rapid Post Direct 2,507,000.00 0.00 Canceled 2020-12-17 2021-01-26 2020-12-22 2021-01-29 2020-12-31 2021-02-28 care beds, 750 psc (Direct) Emergency Response Emergency COVID-19 G1.58 / High Flow CPAP UN Agencies IBRD / 91170 Measures and Rapid Post Direct 43,000.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 Nasal Cannula, 1000 pcs (Direct) Emergency Response Emergency COVID-19 G1.59 / Barrier (Filter) tips UN Agencies IBRD / 91170 Measures and Rapid Post Direct 525,800.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 100µL, 15 000 000 pcs (Direct) Emergency Response Emergency COVID-19 G1.60 / Barrier (Filter) tips UN Agencies IBRD / 91170 Measures and Rapid Post Direct 35,200.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 200 µL, 1 000 000 pcs (Direct) Emergency Response Emergency COVID-19 G1.61 / Barrier (Filter) tips UN Agencies IBRD / 91170 Measures and Rapid Post Direct 280,500.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 1000 µL, 8 000 000 pcs (Direct) Emergency Response Emergency COVID-19 G1.62 / Barrier (Filter) tips 10 UN Agencies IBRD / 91170 Measures and Rapid Post Direct 35,200.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 µL, 1 000 000 pcs (Direct) Emergency Response Emergency COVID-19 G1.63 / Non-filtered tips 200 UN Agencies IBRD / 91170 Measures and Rapid Post Direct 15,400.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 µL, 3 000 000 pcs (Direct) Emergency Response Emergency COVID-19 G1.64 / Non-filtered tips UN Agencies IBRD / 91170 Measures and Rapid Post Direct 1,100.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 1000 µL, 300 000 pcs (Direct) Emergency Response G1.66 / Eppendorf conical Emergency COVID-19 UN Agencies tube with a snap cap, capacity IBRD / 91170 Measures and Rapid Post Direct 97,350.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 (Direct) 1.5 ml, 5 000 000 pcs Emergency Response G1.68 / Set of consumables Emergency COVID-19 for automated RNA extraction, UN Agencies IBRD / 91170 Measures and Rapid Post Direct 78,100.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 for the study of 200 000 (Direct) Emergency Response samples G 1.21 / Adult CPAP high- Emergency COVID-19 UN Agencies flow therapy device completed IBRD / 91170 Measures and Rapid Post Direct 1,060,950.00 0.00 Canceled 2020-12-14 2020-12-21 2020-12-31 2021-03-31 (Direct) with cannulas set, 300 pcs Emergency Response Emergency COVID-19 G1.23 / Bronchoscope, 100 UN Agencies IBRD / 91170 Measures and Rapid Post Direct 2,350,000.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-03-31 pcs (Direct) Emergency Response G1.36 / Medical ventilator of Emergency COVID-19 UN Agencies HFlow, CPAP and NIF high- IBRD / 91170 Measures and Rapid Post Direct 8,081,700.00 0.00 Canceled 2020-12-17 2020-12-18 2020-12-31 2021-07-30 (Direct) tech features, 310 pcs Emergency Response G1.39 / Multi-purpose device Emergency COVID-19 UN Agencies for renal replacement therapy IBRD / 91170 Measures and Rapid Post Direct 4,083,750.00 0.00 Canceled 2020-12-17 2020-12-18 2020-12-31 2021-07-31 (Direct) (RRT), 30 pcs Emergency Response G1.41 / Extracorporeal Emergency COVID-19 membrane oxygenation UN Agencies IBRD / 91170 Measures and Rapid Post Direct 924,000.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-06-30 device completed with (Direct) Emergency Response expendables (15 sets), 8 pcs Page 3 G1.45 / Automatic device for Emergency COVID-19 UN Agencies cardiopulmonary IBRD / 91170 Measures and Rapid Post Direct 1,337,000.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-07-31 (Direct) resuscitation, 90 pcs Emergency Response Emergency COVID-19 G1.49 / Ultrasound device of UN Agencies IBRD / 91170 Measures and Rapid Post Direct 2,237,000.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-03-31 expert grade, 30 pcs (Direct) Emergency Response Emergency COVID-19 G1.50 / Ultrasound device of UN Agencies IBRD / 91170 Measures and Rapid Post Direct 4,725,000.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-03-31 high grade, 100 pcs (Direct) Emergency Response G1.52 / Video bronchoscopy Emergency COVID-19 complex with 4 video UN Agencies IBRD / 91170 Measures and Rapid Post Direct 1,651,000.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-07-31 bronchoscopes and a laser (Direct) Emergency Response endo-surgery module, 8 psc Emergency COVID-19 G 1.53 / Portable thoracic UN Agencies IBRD / 91170 Measures and Rapid Post Direct 26,400.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-05-31 suction system, 15 psc (Direct) Emergency Response G 1.55 / Patient convection Emergency COVID-19 UN Agencies heating system (thermal IBRD / 91170 Measures and Rapid Post Direct 1,023,000.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-04-30 (Direct) blankets), 500 pcs. Emergency Response G1.57 / Anesthesia and Emergency COVID-19 UN Agencies respiratory apparatus, 220 IBRD / 91170 Measures and Rapid Post Direct 7,986,000.00 0.00 Canceled 2020-12-10 2020-12-14 2020-12-31 2021-07-31 (Direct) psc Emergency Response G1.67 / Containers for Emergency COVID-19 biomaterials collection with UN Agencies IBRD / 91170 Measures and Rapid Post Direct 78,100.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-02-28 swabs for PCR diagnostics, 1 (Direct) Emergency Response 000 000 pcs G1.15 / Aspiration catheter Emergency COVID-19 with vacuum control, 250000 IBRD / 91170 Measures and Rapid Post Direct Selection Direct 49,500.00 0.00 Canceled 2020-12-10 2020-12-11 2020-12-31 2021-02-28 pcs Emergency Response Emergency COVID-19 G 1.16 / Closed suction UN Agencies IBRD / 91170 Measures and Rapid Post Direct 178,200.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2020-12-31 system, 10 000 pcs (Direct) Emergency Response Emergency COVID-19 G 1.17 / Noninvasive UN Agencies IBRD / 91170 Measures and Rapid Post Direct 69,300.00 0.00 Canceled 2020-12-10 2020-12-15 2020-12-31 2021-02-28 ventilation mask, 600 pcs (Direct) Emergency Response Emergency COVID-19 G1.4 / Shoes cover, 450000 IBRD / 91170 Measures and Rapid Post Direct Selection Direct 130,000.00 154,234.22 Signed 2020-07-10 2021-04-16 2020-07-13 2021-04-16 2021-03-30 2021-03-22 2021-04-29 twins Emergency Response G1.69 / Medical test kit for Emergency COVID-19 the PCR diagnostics, 220000 IBRD / 91170 Measures and Rapid Post Direct Selection Direct 156,200.00 169,258.85 Signed 2020-10-20 2021-03-10 2020-10-25 2021-03-03 2021-04-01 2021-03-12 2021-05-01 pcs Emergency Response G 1.70 / Medical test kit for Emergency COVID-19 Request for Single Stage - One the ELISA diagnostics, 200 IBRD / 91170 Measures and Rapid Post Open - National 625,000.00 0.00 Canceled 2021-02-24 2021-03-31 2021-05-31 Quotations Envelope 064 pcs Emergency Response Emergency COVID-19 G1.48 / Ambulances, 50 pcs IBRD / 91170 Measures and Rapid Post Direct Selection Direct 6,050,000.00 0.00 Canceled 2020-12-10 2020-10-16 2020-12-11 2021-03-10 2020-12-31 2021-05-31 Emergency Response Emergency COVID-19 Under G1.11.1 / Syringe dosing Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 799,050.00 0.00 Implementati 2021-05-03 2021-06-30 2021-09-30 device, 1246 pcs Quotations Envelope Emergency Response on G1.70/1 / Medical test kit for Emergency COVID-19 Under Request for Single Stage - One the ELISA diagnostics, 200064 IBRD / 91170 Measures and Rapid Post Open - National 625,000.00 0.00 Implementati 2021-04-06 2021-05-26 2021-04-28 2021-05-31 Quotations Envelope pcs Emergency Response on Emergency COVID-19 Pending G1.73.1 / 64-slice computer IBRD / 91170 Measures and Rapid Post Direct Selection Direct 854,700.00 0.00 Implementati 2021-04-14 2021-04-19 2021-05-31 2021-12-31 tomograph, 3 pcs Emergency Response on Emergency COVID-19 Pending Single Stage - One G1.78 / MRI machine, 2 pcs IBRD / 91170 Measures and Rapid Post Request for Bids Open - National 1,980,000.00 0.00 Implementati 2021-04-28 2021-05-03 2021-05-31 2021-06-09 2021-06-30 2021-10-31 Envelope Emergency Response on G1.79 / Hemodialysis Emergency COVID-19 Pending Request for Single Stage - One apparatus (artificial kidney) of IBRD / 91170 Measures and Rapid Post Open - National 192,500.00 0.00 Implementati 2021-04-25 2021-06-30 2021-12-27 Quotations Envelope high class, 5 pcs Emergency Response on G1.80 / Hemodialysis Emergency COVID-19 Pending Request for Single Stage - One apparatus (artificial kidney) of IBRD / 91170 Measures and Rapid Post Open - National 693,000.00 0.00 Implementati 2021-04-25 2021-06-30 2021-12-27 Quotations Envelope middle class, 42 pcs Emergency Response on Emergency COVID-19 Pending Request for Single Stage - One G1.81 / Defibrillator, 65 pcs. IBRD / 91170 Measures and Rapid Post Open - National 71,500.00 0.00 Implementati 2021-05-01 2021-06-30 2021-10-31 Quotations Envelope Emergency Response on G1.82 / Verticalizer for early Emergency COVID-19 Pending patient rehabilitation of Request for Single Stage - One IBRD / 91170 Measures and Rapid Post Open - National 671,000.00 0.00 Implementati 2021-04-25 2021-06-30 2021-10-31 resuscitation and intensive Quotations Envelope Emergency Response on care unit, 100 pcs Emergency COVID-19 Pending G1.83 / Injector for computer Single Stage - One IBRD / 91170 Measures and Rapid Post Request for Bids Open - National 2,156,000.00 0.00 Implementati 2021-04-12 2021-04-17 2021-05-04 2021-06-03 2021-06-30 2021-10-31 tomograph, 56 pcs Envelope Emergency Response on Emergency COVID-19 Under G1.25 / Patient monitor, 923 IBRD / 91170 Measures and Rapid Post Direct Selection Direct 3,407,600.00 0.00 Implementati 2020-07-27 2021-03-03 2020-08-06 2021-03-03 2021-04-14 2021-07-29 pcs Emergency Response on Emergency COVID-19 G 1.3 / Medical gloves, 20 UN Agencies IBRD / 91170 Measures and Rapid Post Direct 2,530,000.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 000 000 pcs (Direct) Emergency Response Page 4 Emergency COVID-19 G1.19 / Oxygen Concentrator UN Agencies IBRD / 91170 Measures and Rapid Post Direct 990,000.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-16 2021-01-29 2020-12-28 2021-03-31 of ≥5 l capacity, 1030 pcs (Direct) Emergency Response Emergency COVID-19 G1.6 / Protective glasses, UN Agencies IBRD / 91170 Measures and Rapid Post 90,200.00 0.00 Canceled 2020-12-10 2020-12-14 2020-12-31 2021-02-28 20000 pcs (Direct) Emergency Response G1.65 / Eppendorf PCR Emergency COVID-19 conical tube with a flat cap, UN Agencies IBRD / 91170 Measures and Rapid Post Direct 39,050.00 0.00 Canceled 2020-12-10 2021-01-26 2020-12-15 2021-01-29 2020-12-31 2021-02-28 capacity 0.2 ml, 1 000 000 (Direct) Emergency Response pcs G1.75 / Agreement with Emergency COVID-19 Under UN Agencies UNICEF (supply of medical IBRD / 91170 Measures and Rapid Prior Direct 2,260,985.31 0.00 Implementati 2021-03-29 2021-04-08 2021-03-29 2021-03-31 2021-09-27 (Direct) equipment and products) Emergency Response on G1.77 / Agreement with Emergency COVID-19 Under UN Agencies UNFPA (supply of medical IBRD / 91170 Measures and Rapid Prior Direct 1,585,122.70 0.00 Implementati 2021-04-05 2021-04-08 2021-04-06 2021-04-14 2021-04-08 2021-09-30 (Direct) products) Emergency Response on Emergency COVID-19 Pending G1.38 / Ultra-sound portable Single Stage - One IBRD / 91170 Measures and Rapid Post Request for Bids Limited 5,775,000.00 0.00 Implementati 2021-04-29 2021-05-04 2021-06-15 2021-07-15 2021-08-19 2022-02-15 device, 250 pcs Envelope Emergency Response on G1.76 / Agreement with Emergency COVID-19 UN Agencies UNDP (supply of medical IBRD / 91170 Measures and Rapid Prior Direct 53,655,135.52 56,435,203.00 Signed 2021-03-31 2021-05-07 2021-03-31 2021-05-13 2021-04-01 2021-01-19 2022-05-31 (Direct) equipment and products) Emergency Response Pending Project Implementation and Request for Single Stage - One OE2.1.4 / Office equipment IBRD / 91170 Post Open - National 22,000.00 0.00 Implementati 2021-04-07 2021-04-30 2021-06-30 Monitoring Quotations Envelope on Emergency COVID-19 Under G1.48.1 / Reanimobile, 55 Single Stage - One IBRD / 91170 Measures and Rapid Prior Request for Bids Open - International 7,200,000.00 0.00 Implementati 2021-05-14 2021-05-20 2021-05-19 2021-05-20 2021-05-31 2021-06-30 2021-07-22 2021-12-22 pcs Envelope Emergency Response on Emergency COVID-19 Pending G1.48/1 / Specialized Single Stage - One IBRD / 91170 Measures and Rapid Post Request for Bids Open - National 1,668,000.00 0.00 Implementati 2021-06-07 2021-06-12 2021-07-07 2021-07-22 2021-08-14 2022-02-10 medical vehicles, 17 pcs Envelope Emergency Response on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Emergency COVID-19 Under NCS1.1 / Goods procurement IBRD / 91170 Measures and Rapid Post Direct Selection Direct 1,100,000.00 0.00 Implementati 2020-12-03 2020-12-01 2020-12-08 2020-12-31 2022-05-31 logistics support Emergency Response on Pending Project Implementation and Request for Single Stage - One NCS1.2 / Printing services IBRD / 91170 Post Open - National 55,000.00 0.00 Implementati 2021-04-10 2021-05-05 2022-05-31 Monitoring Quotations Envelope on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS1.2 / Comnsultants services to provide communication measures to Emergency COVID-19 Consultant increase peoples' awareness IBRD / 91170 Measures and Rapid Post Qualification Limited 28,000.00 0.00 Canceled 2020-07-08 2020-07-15 2020-07-20 2020-08-19 2022-03-31 and risks comprehension Emergency Response Selection concerning to the COVID-19 emergency INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Emergency COVID-19 CS1.1 / Goods procurement IBRD / 91170 Measures and Rapid Post Direct Selection Direct 4,400,000.00 0.00 Canceled 2020-07-08 2020-07-24 2020-07-12 2020-08-19 2022-03-31 logistics support Emergency Response ED1.1 / Medical staff training Emergency COVID-19 Pending of epidemy emergency IBRD / 91170 Measures and Rapid Post Direct Selection Direct 22,000.00 0.00 2020-08-07 2020-08-15 2020-08-19 2022-03-31 Implementation prompt response Emergency Response CS 1.2 / Comnsultants services to provide communication measures to Emergency COVID-19 Individual Under increase peoples' awareness IBRD / 91170 Measures and Rapid Post Consultant Limited 28,000.00 0.00 2020-07-30 2020-07-27 2020-08-06 2020-08-20 2020-08-28 2022-03-31 Implementation and risks comprehension Emergency Response Selection concerning to the COVID-19 emergency O.E2.1.5 / Consulting Project Implementation and Under services of environmental IBRD / 91170 Post Direct Selection Direct 11,000.00 0.00 2020-11-20 2020-11-20 2020-11-28 2020-12-08 2021-06-06 Monitoring Implementation engineer Project Implementation and Pending OE 2.1.2 / Audit IBRD / 91170 Post Direct Selection Direct 33,000.00 0.00 2021-02-17 2021-02-26 2021-03-31 2021-05-31 Monitoring Implementation Page 5 PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Georgia : Georgia I2Q - Innovation, Inclusion and Quality PLAN General Information Country: Georgia Bank’s Approval Date of the Original Procurement Plan: 2020-02-04 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168481 GPN Date: 2020-01-21 Project Name: Georgia I2Q - Innovation, Inclusion and Quality Loan / Credit No: IBRD / 89550 M Executing Agency(ies): inistry of Education, Science, Culture and Sports WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GE-MESCS-156011-CW-RFQ Supporting Project Pending Request for Single Stage - One 2022-04- / Rehabilitation of the PMU IBRD / 89550 Management, Monitoring, Post Open - National 100,000.00 0.00 Implementat 2021-11-15 2021-12-22 Quotations Envelope 21 office and Evaluations ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-MESCS-153227-GO-RFB Improving the Quality of and / Single Stage - One IBRD / 89550 Access to Early Childhood Prior Request for Bids Open - International 3,750,000.00 0.00 Canceled 2022-02-01 2022-02-06 2022-03-20 2022-04-19 2022-05-24 2022-12-20 Equipment/Furniture/Technol Envelope Education and Care ogy for the newly refurbished preschool programs GE-MESCS-153742-GO-RFB / Procure hardware and System Strengthening and Single Stage - One software to support the IBRD / 89550 Post Request for Bids Open - National 625,000.00 0.00 Canceled 2021-01-04 2021-01-09 2021-02-20 2021-03-22 2021-04-26 2021-07-25 Stakeholder Communication Envelope implementation of the dashboards, servers and security software GE-MESCS-153952-GO-RFB / Procurement of innovative Fostering Quality Teaching Single Stage - One resources as part of a school IBRD / 89550 and Learning in General Prior Request for Bids Open - International 8,062,500.00 0.00 Canceled 2021-05-04 2021-05-09 2021-06-20 2021-07-20 2021-08-24 2022-02-20 Envelope improvement package for Education pilot schools GE-MESCS-156013-GO-RFQ Supporting Project Request for Single Stage - One / Purchase of computer IBRD / 89550 Management, Monitoring, Post Open - National 25,000.00 23,234.45 Signed 2020-08-10 2020-09-15 2020-09-11 2020-10-15 Quotations Envelope equipment for PMU and Evaluations Supporting Project GE-MESCS-185614-GO-RFQ Request for Single Stage - One IBRD / 89550 Management, Monitoring, Post Open - National 30,000.00 27,906.98 Terminated 2020-08-17 2020-09-23 2020-10-02 2020-10-23 / Purchase of vehicle for PMU Quotations Envelope and Evaluations GE-MESCS-192159-GO-RFB Fostering Quality Teaching / Procurement of Technology Single Stage - One IBRD / 89550 and Learning in General Prior Request for Bids Open - International 3,896,600.00 3,572,780.00 Signed 2020-09-20 2020-10-07 2020-09-25 2020-11-14 2020-11-06 2020-11-30 2020-12-06 2021-01-18 2021-01-10 2021-03-01 2021-05-10 Equipment for Schools Envelope Education (Laptops and Projectors) GE-MESCS-185616-GO-RFQ Supporting Project Request for Single Stage - One / Purchase of office furniture IBRD / 89550 Management, Monitoring, Post Open - National 23,000.00 0.00 Canceled 2020-11-15 2020-12-22 2021-01-21 Quotations Envelope for PMU and Evaluations GE-MESCS-200434-GO-RFB Fostering Quality Teaching / Supply and Installation of Wi- Single Stage - One IBRD / 89550 and Learning in General Prior Request for Bids Open - National 1,230,000.00 0.00 Canceled 2020-10-30 2020-11-04 2020-12-16 2021-01-15 2021-02-19 2021-08-18 Fi for Schools Located in East Envelope Education and West of Georgia (2 Lots) GE-MESCS-201908-GO-RFB Fostering Quality Teaching / Supply and Installation of Wi- Single Stage - One IBRD / 89550 and Learning in General Prior Request for Bids Open - International 1,230,000.00 0.00 Canceled 2020-11-05 2020-11-10 2020-12-22 2021-01-21 2021-02-25 2021-08-24 Fi for Schools Located in East Envelope Education and West of Georgia (2 Lots) GE-MESCS-207183-GO-RFB / Check Pont Security System System Strengthening and Single Stage - One IBRD / 89550 Post Request for Bids Open - National 485,000.00 494,000.00 Signed 2020-12-04 2020-12-20 2020-12-09 2020-12-25 2020-12-24 2021-01-26 2020-12-29 2021-02-15 2021-01-17 2021-02-23 2024-01-12 Renewal and Software Stakeholder Communication Envelope Licensing GE-MESCS-210068-GO-RFB / Supply and Installation of Wi- Fostering Quality Teaching Single Stage - One Fi Networks in 121 Schools IBRD / 89550 and Learning in General Post Request for Bids Open - International 1,230,000.00 0.00 Canceled 2020-12-20 2020-12-25 2020-12-25 2021-02-08 2021-02-05 2021-02-22 2021-03-07 2021-04-21 2021-04-11 2021-10-08 Envelope Located in East and West Parts Education of Georgia GE-MESCS-212359-GO-RFB / Procure Hardware and Software to Support the Pending Implementation of Big data, System Strengthening and Single Stage - One IBRD / 89550 Post Request for Bids Open - National 515,000.00 0.00 Implementati 2022-02-28 2022-03-05 2022-04-16 2022-05-16 2022-06-20 2023-06-20 Analytics, Dashboards, Stakeholder Communication Envelope on Mapping and Security Software, Servers and Storage Infrastructure, and Hardware GE-MESCS-210068-GO-RFB- 2 / Supply and Installation of Wi-Fi Networks in 121 Fostering Quality Teaching Under Schools Located in Single Stage - One IBRD / 89550 and Learning in General Post Request for Bids Open - International 1,610,000.00 0.00 Implementati 2021-06-10 2021-06-07 2021-06-15 2021-06-07 2021-07-27 2021-08-26 2021-09-30 2022-03-29 East and West Parts of Georgia Envelope Education on (Lot-1 - East Georgia (63 Schools) and Lot-2 - West Georgia (58 Schools)) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-MESCS-155983-CS-CQS Improving the Quality of and Consultant / Assessment of existed pre- IBRD / 89550 Access to Early Childhood Post Qualification Open - National 100,000.00 0.00 Canceled 2020-06-25 2020-07-16 2020-08-29 2020-09-28 2020-11-02 2021-03-02 school services: access, Education and Care Selection quality and needs GE-MESCS-155981-CS-QBS / Improving the Quality of and Quality Based Establish database of ECE IBRD / 89550 Access to Early Childhood Post Open - National 162,500.00 0.00 Canceled 2021-08-13 2021-09-03 2021-10-17 2021-11-14 2021-12-14 2022-01-13 2022-02-17 2023-02-17 Selection intersectoral management Education and Care GE-MESCS-153361-CS-QCBS / Support quality Improving the Quality of and Quality And Cost- enhancement of early IBRD / 89550 Access to Early Childhood Post Open - International 537,500.00 0.00 Canceled 2020-12-23 2021-01-13 2021-02-26 2021-03-26 2021-04-25 2021-05-30 2021-07-04 2024-07-03 Based Selection childhood and preschool Education and Care education GE-MESCS-153391-CS-QCBS Fostering Quality Teaching Quality And Cost- / Education system diagnostic IBRD / 89550 and Learning in General Post Open - International 375,000.00 0.00 Canceled 2021-07-24 2021-08-14 2021-09-27 2021-10-25 2021-11-24 2021-12-29 2022-02-02 2023-02-02 Based Selection and functional review Education GE-MESCS-155978-CS-QBS / Fostering Quality Teaching Evaluation of ongoing pilot of Quality Based IBRD / 89550 and Learning in General Post Open - National 125,000.00 0.00 Canceled 2020-08-13 2020-09-03 2020-10-17 2020-11-14 2020-12-14 2021-01-13 2021-02-17 2021-07-17 whole-school improvement Selection Education approach GE-MESCS-153393-CS-QCBS Fostering Quality Teaching Quality And Cost- / Support establishment of IBRD / 89550 and Learning in General Prior Open - International 1,875,000.00 0.00 Canceled 2022-05-04 2022-05-25 2022-07-08 2022-08-05 2022-09-04 2022-10-09 2022-11-13 2025-10-28 Based Selection innovation clubs, schools Education GE-MESCS-155977-CS-QBS / Review, improve and develop Fostering Quality Teaching Quality Based continuous professional IBRD / 89550 and Learning in General Post Open - National 250,000.00 0.00 Canceled 2020-08-08 2020-08-29 2020-10-12 2020-11-09 2020-12-09 2021-01-08 2021-02-12 2021-02-24 Selection development framework of Education educators GE-MESCS-153395-CS-QCBS / Development and delivery of training modules on modern Fostering Quality Teaching pedagogy and formative Quality And Cost- IBRD / 89550 and Learning in General Prior Open - International 1,312,500.00 0.00 Canceled 2021-01-01 2021-01-22 2021-03-07 2021-04-04 2021-05-04 2021-06-08 2021-07-13 2024-06-27 continuous assessment for Based Selection Education educators on the new whole school improvement model in project-supported schools GE-MESCS-153398-CS-QCBS / Development of a Fostering Quality Teaching Quality And Cost- collaborative e-platform for IBRD / 89550 and Learning in General Prior Open - International 1,125,000.00 0.00 Canceled 2022-05-18 2022-06-08 2022-07-22 2022-08-19 2022-09-18 2022-10-23 2022-11-27 2024-11-26 Based Selection sharing best practices and Education distance education GE-MESCS-153402-CS-QCBS / Revision, establishment and Fostering Quality Teaching Quality And Cost- implementation of the IBRD / 89550 and Learning in General Prior Open - International 2,875,000.00 0.00 Canceled 2020-08-08 2020-08-29 2020-10-12 2020-11-09 2020-12-09 2021-01-13 2021-02-17 2025-02-16 Based Selection national formative Education assessments GE-MESCS-155976-CS-QBS / Support Capacity Building of Fostering Quality Teaching Quality Based NAEC in the design, conduct IBRD / 89550 and Learning in General Post Open - National 125,000.00 0.00 Canceled 2020-08-04 2020-08-25 2020-10-08 2020-11-05 2020-12-05 2021-01-04 2021-02-08 2024-02-08 Selection and analysis of student Education assessments GE-MESCS-155984-CS-QBS / Establish National Institute for Education Research to use analysis to inform policy Fostering Quality Teaching Quality Based actions to improve teaching IBRD / 89550 and Learning in General Post Open - National 250,000.00 0.00 Canceled 2020-12-04 2020-12-25 2021-02-07 2021-03-07 2021-04-06 2021-05-06 2021-06-10 2024-09-17 Selection and learning at all levels of Education education (effectiveness, equity, and efficiency) - development of portal GE-MESCS-153406-CS-QCBS / Development of the remedial programs to Fostering Quality Teaching accommodate the needs of Quality And Cost- IBRD / 89550 and Learning in General Post Open - International 312,500.00 0.00 Canceled 2021-01-04 2021-01-25 2021-03-10 2021-04-07 2021-05-07 2021-06-11 2021-07-16 2023-07-16 students with disabilities, Based Selection Education students with diverse educational needs, vulnerable students and national minorities GE-MESCS-153573-CS-QCBS Strengthening Financing / Competitive Innovation Options and Promoting Quality And Cost- IBRD / 89550 Prior Open - International 1,250,000.00 0.00 Canceled 2020-11-03 2020-11-24 2021-01-07 2021-02-04 2021-03-06 2021-04-10 2021-05-15 2024-08-22 Grants for public and private Internationalization in Higher Based Selection universities Education GE-MESCS-153576-CS-QCBS Strengthening Financing / Support for international Options and Promoting Quality And Cost- partnerships with foreign IBRD / 89550 Prior Open - International 1,437,500.00 0.00 Canceled 2022-08-08 2022-08-29 2022-10-12 2022-11-09 2022-12-09 2023-01-13 2023-02-17 2026-02-21 Internationalization in Higher Based Selection institutions, universities and Education private sector Strengthening Financing GE-MESCS-153691-CS-QCBS Options and Promoting Quality And Cost- / Strengthen quality of pre- IBRD / 89550 Prior Open - International 2,562,500.00 0.00 Canceled 2021-06-03 2021-06-24 2021-08-07 2021-09-04 2021-10-04 2021-11-08 2021-12-13 2024-12-12 Internationalization in Higher Based Selection service teacher education Education GE-MESCS-153696-CS-QCBS Strengthening Financing / Introduction of new courses Options and Promoting Quality And Cost- IBRD / 89550 Post Open - International 312,500.00 0.00 Canceled 2022-08-18 2022-09-08 2022-10-22 2022-11-19 2022-12-19 2023-01-23 2023-02-27 2026-02-26 on assessment and Internationalization in Higher Based Selection psychometrics Education GE-MESCS-155985-CS-QBS / Strengthening Financing Strengthen qualification Options and Promoting Quality Based IBRD / 89550 Post Open - National 250,000.00 0.00 Canceled 2021-12-18 2022-01-08 2022-02-21 2022-03-21 2022-04-20 2022-05-20 2022-06-24 2026-01-14 program for preschool Internationalization in Higher Selection teachers Education Page 2 GE-MESCS-155975-CS-QBS / Diagnostic assessment of EMIS and other educational System Strengthening and Quality Based IBRD / 89550 Post Open - National 250,000.00 0.00 Canceled 2020-07-18 2020-08-08 2020-09-21 2020-10-19 2020-11-18 2020-12-18 2021-01-22 2022-01-22 databases and inducing Stakeholder Communication Selection recommendations for improvement GE-MESCS-153713-CS-QCBS / Development and System Strengthening and Quality And Cost- IBRD / 89550 Post Open - International 625,000.00 0.00 Canceled 2021-12-28 2022-01-18 2022-03-03 2022-03-31 2022-04-30 2022-06-04 2022-07-09 2024-07-08 operationalize dashboard Stakeholder Communication Based Selection systems GE-MESCS-153729-CS-QCBS / Development of the System Strengthening and Quality And Cost- analytics systems for IBRD / 89550 Post Open - International 375,000.00 0.00 Canceled 2021-01-04 2021-01-25 2021-03-10 2021-04-07 2021-05-07 2021-06-11 2021-07-16 2022-07-16 Stakeholder Communication Based Selection education system mapping at all levels GE-MESCS-155986-CS-QBS / Strengthen of NAEC capacity System Strengthening and Quality Based in assessment and IBRD / 89550 Post Open - National 250,000.00 0.00 Canceled 2021-02-01 2021-02-22 2021-04-07 2021-05-05 2021-06-04 2021-07-04 2021-08-08 2022-08-08 Stakeholder Communication Selection examination of information systems management GE-MESCS-155974-CS-QBS / Develop strategy and actions System Strengthening and Quality Based IBRD / 89550 Post Open - National 187,500.00 0.00 Canceled 2020-08-04 2020-08-25 2020-10-08 2020-11-05 2020-12-05 2021-01-04 2021-02-08 2025-02-07 for engaging all stakeholders Stakeholder Communication Selection in education reform GE-MESCS-155972-CS-QBS / Awareness raising of Georgian System Strengthening and Quality Based human capital regarding IBRD / 89550 Post Open - National 250,000.00 0.00 Canceled 2020-06-01 2020-06-22 2020-08-05 2020-09-02 2020-10-02 2020-11-01 2020-12-06 2024-12-05 Stakeholder Communication Selection education reforms in alignment with EU goals GE-MESCS-155989-CS-QBS / System Strengthening and Quality Based IBRD / 89550 Post Open - National 150,000.00 0.00 Canceled 2021-05-04 2021-05-25 2021-07-08 2021-08-05 2021-09-04 2021-10-04 2021-11-08 2025-11-07 Showcase of success stories Stakeholder Communication Selection GE-MESCS-154514-CS-CQS / Procurement of Study tour Fostering Quality Teaching Consultant for capacity building for NAEC IBRD / 89550 and Learning in General Post Qualification Open - National 25,000.00 0.00 Canceled 2020-06-02 2020-06-23 2020-08-06 2020-09-05 2020-10-10 2020-12-09 regarding to census based Education Selection national assessments GE-MESCS-156322-CS-QCBS Fostering Quality Teaching / Procurement for Developing Quality And Cost- IBRD / 89550 and Learning in General Prior Open - International 1,000,000.00 0.00 Canceled 2021-01-15 2021-02-05 2021-03-21 2021-04-18 2021-05-18 2021-06-22 2021-07-27 2024-07-26 IT Software for National Based Selection Education Assessments GE-MESCS-157910-CS-CQS Fostering Quality Teaching Consultant / Consulting Services for IBRD / 89550 and Learning in General Post Qualification Open - National 99,863.00 0.00 Canceled 2020-04-28 2020-05-19 2020-07-02 2020-08-01 2020-09-05 2021-04-03 Developing Concept of Education Selection Education Facility Planning GE-MESCS-153559-CS-QCBS Strengthening Financing / Development of the new Options and Promoting Quality And Cost- IBRD / 89550 Post Open - International 375,000.00 0.00 Canceled 2020-06-15 2020-07-06 2020-08-19 2020-09-16 2020-10-16 2020-11-20 2020-12-25 2021-06-23 options for higher education Internationalization in Higher Based Selection financing Education GE-MESCS-189604-CS-QBS / Strengthening Financing Consulting Services for the Options and Promoting Quality Based Development of New Model IBRD / 89550 Post Open - International 294,475.00 289,254.89 Signed 2020-08-30 2020-09-15 2020-09-20 2020-09-21 2020-11-03 2020-11-04 2020-12-01 2020-12-18 2020-12-31 2021-01-27 2021-01-30 2021-02-18 2021-03-06 2021-04-12 2021-09-02 Internationalization in Higher Selection for Higher Education Education Financing GE-MESCS-192180-CS-QBS / Diagnostic Study of the Improving the Quality of and Quality Based Existing School-based IBRD / 89550 Access to Early Childhood Post Open - International 171,415.00 0.00 Canceled 2020-09-20 2020-09-09 2020-10-11 2020-11-24 2020-12-22 2021-01-21 2021-02-20 2021-03-27 2021-10-23 Selection Preschool Services (access, Education and Care quality and needs) in Georgia GE-MESCS-193021-CS-QBS / Consulting Services for Diagnostic Assessment of System Strengthening and Quality Based Education Management IBRD / 89550 Post Open - International 275,228.00 279,038.72 Signed 2020-09-22 2020-10-13 2020-10-13 2020-10-20 2020-11-26 2020-12-24 2020-12-24 2021-02-01 2021-01-23 2021-03-29 2021-02-22 2021-05-20 2021-03-29 2021-06-08 2021-10-25 Stakeholder Communication Selection Information System (EMIS), Data Integration and Analytic Systems GE-MESCS-194310-CS-QBS / Fostering Quality Teaching Consulting Services for Study Quality Based Under IBRD / 89550 and Learning in General Post Open - International 287,625.00 0.00 2020-09-25 2020-10-06 2020-10-16 2020-10-13 2020-11-29 2020-12-27 2021-01-26 2021-02-25 2021-04-01 2021-11-27 and Evaluation of Trends in Selection Implementation Education General Education in Georgia GE-MESCS-197460-CS-QBS / Diagnostic Study of Early Improving the Quality of and Quality Based Under Childhood Education/ECE IBRD / 89550 Access to Early Childhood Post Open - International 205,189.00 0.00 2020-10-05 2020-11-09 2020-10-26 2020-11-20 2020-12-09 2021-01-06 2021-02-05 2021-03-07 2021-04-11 2022-02-05 Selection Implementation Sector (access, quality and Education and Care needs) in Georgia GE-MESCS-155979-CS-QBS / Developing General Education Fostering Quality Teaching Quality Based Infrastructure and Physical IBRD / 89550 and Learning in General Post Open - National 187,000.00 0.00 Canceled 2020-12-15 2020-12-26 2021-01-05 2021-02-15 2021-02-18 2021-03-18 2021-04-17 2021-05-17 2021-06-05 2023-02-25 Selection Environment Standards in Education Schools of Georgia GE-MESCS-212213-CS-QCBS / Improving ECE Institution Management System and Enhancing the Quality of Improving the Quality of and Quality And Cost- Pending Programs Across the Country, IBRD / 89550 Access to Early Childhood Post Open - International 2,340,000.00 0.00 2021-07-15 2021-08-05 2021-09-03 2021-10-01 2021-10-21 2021-11-25 2021-12-30 2024-12-29 Based Selection Implementation Increasing Equitable Access to Education and Care Preschool Education for Successful Transition to School GE-MESCS-212278-CS-QCBS / Facilitate the Strengthening Financing Implementation of a New Options and Promoting Quality And Cost- Pending Model of Performance-based IBRD / 89550 Post Open - International 1,500,000.00 0.00 2021-09-15 2021-09-29 2021-11-02 2021-11-16 2021-11-30 2021-12-28 2022-01-21 2024-01-21 Internationalization in Higher Based Selection Implementation Funding by Creating HEIs Education Information Management Database System Page 3 GE-MESCS-212280-CS-QCBS / Promoting internationalization of higher education through designing Strengthening Financing and implementing joint Options and Promoting Quality And Cost- Pending doctoral program, IBRD / 89550 Post Open - International 1,200,000.00 0.00 2022-03-15 2022-04-05 2022-05-11 2022-05-25 2022-06-24 2022-07-22 2022-08-26 2025-10-24 Internationalization in Higher Based Selection Implementation establishment of an Education International Excellence School, enhancing entrepreneurship and English language skills for students GE-MESCS-212344-CS-QCBS / Strengthening the quality of pre-service teacher education programs and continuous Fostering Quality Teaching professional development Quality And Cost- Pending IBRD / 89550 and Learning in General Post Open - International 1,950,000.00 0.00 2021-10-15 2021-11-05 2021-12-09 2021-12-23 2022-01-12 2022-02-16 2022-03-23 2025-12-17 options, supporting capacity- Based Selection Implementation Education building of teachers and school professionals to develop and implement school-based curriculum GE-MESCS-212347-CS-QBS / Strengthening Financing Preparation of the Full Options and Promoting Quality Based IBRD / 89550 Post Open - International 200,000.00 0.00 Canceled 2021-11-03 2021-11-17 2021-12-15 2021-12-29 2022-01-12 2022-02-11 2022-03-18 2022-09-14 Package of Regulatory Internationalization in Higher Selection Documents for CIF Education GE-MESCS-212350-CS-QCBS / Consulting Services for the Development of the CIF Strengthening Financing Grants Application Portal, Options and Promoting Quality And Cost- Pending IBRD / 89550 Post Open - International 680,000.00 0.00 2022-09-01 2022-09-15 2022-10-19 2022-11-02 2022-12-02 2023-01-06 2023-02-10 2024-12-01 Providing Assistance in the Internationalization in Higher Based Selection Implementation Implementation of CIF Grant Education Project and in the Evaluation of CIF Grant's Proposals GE-MESCS-212352-CS-QCBS / Capacity Building of EMIS to Effectively Implement the Revised Charter, Structure, Scope and Strategy Ensuring System Strengthening and Quality And Cost- Pending Relevant Data Collection, IBRD / 89550 Post Open - International 1,900,000.00 0.00 2022-03-15 2022-03-29 2022-05-03 2022-05-17 2022-06-07 2022-07-12 2022-08-16 2024-08-15 Stakeholder Communication Based Selection Implementation Generation, Analyses and Reporting for Entire Education System and Facilitating Evidence Based Policy Decision-making GE-MESCS-212356-CS-QCBS / Design and Development of Learning Management System System Strengthening and Quality And Cost- Pending (LMS) and Education IBRD / 89550 Post Open - International 1,000,000.00 0.00 2021-09-01 2021-09-15 2021-10-14 2021-10-28 2021-11-11 2021-12-16 2022-01-20 2024-01-20 Stakeholder Communication Based Selection Implementation Management System (EMS) for the National Education System and its Beneficiaries GE-MESCS-212361-CS-CQS / Developing Training Resources and Guides for Consultant System Strengthening and Pending Schools on Selected Distance IBRD / 89550 Post Qualification Open - National 30,000.00 0.00 2021-03-15 2021-03-29 2021-04-26 2021-05-10 2021-06-14 2021-09-12 Stakeholder Communication Implementation Learning Platform(s) and Selection Teaching Methodology Application, Conducting ToT GE-MESCS-212276-CS-QCBS / Fostering Quality Teaching and Learning in General Education through Fostering Quality Teaching Introduction of Effective Quality And Cost- Pending IBRD / 89550 and Learning in General Post Open - International 3,672,333.00 0.00 2021-06-30 2021-07-15 2021-08-13 2021-08-27 2021-09-10 2021-10-08 2021-11-06 2025-05-04 Quality Management System, Based Selection Implementation Education Whole School Improvement Plan and Programs, Improved Assessment Policy, Practice and Methodology. GE-MESCS-212363-CS-CQS Consultant / Developing of Multi-year System Strengthening and Under IBRD / 89550 Post Qualification Open - National 20,000.00 0.00 2021-04-26 2021-05-24 2021-05-10 2021-06-07 2021-06-21 2021-07-15 2021-11-12 Communications Strategy and Stakeholder Communication Implementation Selection Action Plan GE-MESCS-230274-CS-QBS / Developing General Education Fostering Quality Teaching Infrastructure and Physical Quality Based IBRD / 89550 and Learning in General Post Open - International 187,000.00 0.00 Canceled 2021-04-27 2021-04-23 2021-05-18 2021-07-01 2021-07-29 2021-08-28 2021-09-27 2021-11-01 2023-07-04 Environment Standards for Selection Education General Education Institutions (schools) of Georgia GE-MESCS-231735-CS-CQS / Developing General Education Infrastructure and Fostering Quality Teaching Consultant Under Physical Environment IBRD / 89550 and Learning in General Post Qualification Open - International 187,000.00 0.00 2021-04-30 2021-04-28 2021-05-21 2021-04-29 2021-07-04 2021-08-03 2021-09-07 2023-05-10 Implementation Standards for General Education Selection Education Institutions (schools) of Georgia INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-MESCS-153765-CS-INDV / Consultant services for Individual System Strengthening and NAEC to develop ToR for IBRD / 89550 Post Consultant Open 62,500.00 0.00 Canceled 2021-01-04 2021-02-22 2021-03-15 2021-04-19 2022-04-19 Stakeholder Communication assessment and examination Selection system development GE-MESCS-153789-CS-INDV Fostering Quality Teaching Individual / Consultant for development IBRD / 89550 and Learning in General Post Consultant Open 31,250.00 0.00 Canceled 2020-04-07 2020-05-26 2020-06-16 2020-07-21 2020-11-18 of school mapping system Education Selection GE-MESCS-153793-CS-INDV Fostering Quality Teaching Individual / Consultant for development IBRD / 89550 and Learning in General Post Consultant Open 31,250.00 0.00 Canceled 2020-04-07 2020-05-26 2020-06-16 2020-07-21 2020-11-18 of school mapping system Education Selection Page 4 GE-MESCS-153795-CS-INDV Fostering Quality Teaching Individual / Consultant for development IBRD / 89550 and Learning in General Post Consultant Open 31,250.00 0.00 Canceled 2020-04-07 2020-05-26 2020-06-16 2020-07-21 2020-11-18 of school mapping system Education Selection GE-MESCS-153796-CS-INDV Fostering Quality Teaching Individual / Consultant for development IBRD / 89550 and Learning in General Post Consultant Open 31,250.00 0.00 Canceled 2020-04-07 2020-05-26 2020-06-16 2020-07-21 2020-11-18 of school mapping system Education Selection GE-MESCS-154519-CS-INDV Supporting Project Individual / International consultant for IBRD / 89550 Management, Monitoring, Post Consultant Open 75,000.00 0.00 Canceled 2020-07-04 2020-08-22 2020-09-12 2020-10-17 2022-10-17 ECE and Evaluations Selection GE-MESCS-154520-CS-INDV Supporting Project Individual / International consultant for IBRD / 89550 Management, Monitoring, Post Consultant Open 75,000.00 0.00 Canceled 2020-07-04 2020-08-22 2020-09-12 2020-10-17 2022-10-17 HE and Evaluations Selection GE-MESCS-154522-CS-INDV Supporting Project Individual / International consultant for IBRD / 89550 Management, Monitoring, Post Consultant Open 75,000.00 0.00 Canceled 2020-07-04 2020-08-22 2020-09-12 2020-10-17 2022-10-17 Gen Ed and Evaluations Selection Supporting Project GE-MESCS-155991-CS-CDS IBRD / 89550 Management, Monitoring, Prior Direct Selection Direct 360,000.00 0.00 Canceled 2020-01-31 2020-02-17 2020-02-10 2020-04-15 2026-03-15 / Project Coordinator/Director and Evaluations GE-MESCS-155994-CS-INDV Supporting Project Individual / Higher Education IBRD / 89550 Management, Monitoring, Post Consultant Open 253,750.00 174,000.00 Signed 2020-02-05 2020-01-17 2020-03-25 2020-05-28 2020-04-15 2020-05-29 2020-05-20 2020-06-16 2026-02-18 Component Lead and Evaluations Selection GE-MESCS-155998-CS-INDV Supporting Project Individual / Early Childhood Education IBRD / 89550 Management, Monitoring, Post Consultant Open 257,375.00 43,500.00 Signed 2020-03-02 2020-01-17 2020-04-20 2020-05-28 2020-05-11 2020-05-29 2020-06-15 2020-06-16 2026-03-16 and Care’s Component Lead and Evaluations Selection Supporting Project Individual GE-MESCS-156000-CS-INDV IBRD / 89550 Management, Monitoring, Post Consultant Open 257,375.00 0.00 Canceled 2020-03-02 2020-01-17 2020-04-20 2020-05-28 2020-05-11 2020-06-01 2020-06-15 2026-03-16 / General Education Lead and Evaluations Selection GE-MESCS-156001-CS-CDS Supporting Project / Procurement Consultant of IBRD / 89550 Management, Monitoring, Prior Direct Selection Direct 261,000.00 43,500.00 Signed 2020-01-31 2020-02-17 2020-02-10 2020-01-01 2020-04-15 2020-06-01 2026-03-15 PMU 1 and Evaluations Supporting Project GE-MESCS-156003-CS-CDS IBRD / 89550 Management, Monitoring, Prior Direct Selection Direct 270,000.00 45,000.00 Signed 2020-02-02 2020-02-13 2020-02-12 2020-05-25 2020-04-17 2020-06-01 2026-03-17 / FM Specialist of PMU and Evaluations GE-MESCS-156004-CS-INDV Supporting Project Individual / Communication Specialist of IBRD / 89550 Management, Monitoring, Post Consultant Open 172,500.00 120,000.00 Signed 2020-07-15 2020-07-17 2020-09-02 2020-08-31 2020-09-23 2020-08-31 2020-10-28 2020-09-17 2026-03-11 PMU and Evaluations Selection GE-MESCS-156006-CS-INDV Supporting Project Individual / Project Monitoring and IBRD / 89550 Management, Monitoring, Prior Consultant Open 162,000.00 30,000.00 Signed 2020-09-15 2020-07-17 2020-11-03 2020-09-14 2020-11-24 2020-09-16 2020-12-29 2020-10-01 2021-02-12 Evaluation and Evaluations Selection GE-MESCS-156008-CS-INDV Supporting Project Individual / PMU Supporting short-term IBRD / 89550 Management, Monitoring, Post Consultant Open 92,500.00 0.00 Canceled 2020-05-01 2020-06-19 2020-07-10 2020-08-14 2021-12-27 consultants (12-15 short- and Evaluations Selection term experts) GE-MESCS-156047-CS-INDV Supporting Project Individual / ICT/ Data Management IBRD / 89550 Management, Monitoring, Post Consultant Open 90,000.00 22,179.09 Signed 2020-03-08 2020-01-17 2020-04-26 2020-05-28 2020-05-17 2020-05-29 2020-06-21 2020-06-16 2023-06-06 Specialist and Evaluations Selection GE-MESCS-156056-CS-INDV / Consultants for NAEC for Supporting Project Individual TAO platform administration IBRD / 89550 Management, Monitoring, Post Consultant Open 50,000.00 0.00 Canceled 2020-06-15 2020-08-03 2020-08-24 2020-09-28 2020-11-12 (testing assistance for and Evaluations Selection ordinateur) Supporting Project Individual GE-MESCS-156087-CS-INDV IBRD / 89550 Management, Monitoring, Post Consultant Open 115,375.00 19,500.00 Signed 2020-02-10 2020-01-17 2020-03-30 2020-05-28 2020-04-20 2020-05-29 2020-05-25 2020-06-16 2026-03-25 / Administrative Manager and Evaluations Selection Supporting Project Individual GE-MESCS-156089-CS-INDV IBRD / 89550 Management, Monitoring, Post Consultant Open 85,000.00 60,000.00 Signed 2020-05-18 2020-06-02 2020-07-06 2020-07-08 2020-07-27 2020-07-07 2020-08-31 2020-07-24 2026-02-11 / Accountant and Evaluations Selection GE-MESCS-156002-CS-INDV Supporting Project Individual / Procurement Consultant of IBRD / 89550 Management, Monitoring, Post Consultant Open 253,750.00 174,000.00 Signed 2020-06-15 2020-05-29 2020-08-03 2020-07-03 2020-08-24 2020-07-06 2020-09-28 2020-07-21 2026-02-09 PMU 2 and Evaluations Selection GE-MESCS-153945-CS-INDV Improving the Quality of and Individual / Development of ECE's IBRD / 89550 Access to Early Childhood Post Consultant Open 37,500.00 0.00 Canceled 2020-07-10 2020-08-28 2020-09-18 2020-10-23 2021-02-20 Teachers remuneration policy Education and Care Selection GE-MESCS-153946-CS-INDV Improving the Quality of and Individual / Design licensing system for IBRD / 89550 Access to Early Childhood Post Consultant Open 62,500.00 0.00 Canceled 2020-07-15 2020-09-02 2020-09-23 2020-10-28 2021-08-24 existing and novice ECE Education and Care Selection professionals Improving the Quality of and Individual GE-MESCS-153943-CS-INDV IBRD / 89550 Access to Early Childhood Post Consultant Open 31,250.00 0.00 Canceled 2020-07-20 2020-09-07 2020-09-28 2020-11-02 2021-11-02 / Consultant for ECE for MRDI Education and Care Selection GE-MESCS-155992-CS-INDV Supporting Project Individual / Project Coordinator for IBRD / 89550 Management, Monitoring, Post Consultant Open 175,000.00 120,000.00 Signed 2020-06-30 2020-06-30 2020-08-18 2020-08-21 2020-09-08 2020-08-21 2020-10-13 2020-09-07 2022-10-03 Infrastructure projects - and Evaluations Selection Engineer GE-MESCS-168881-CS-INDV Supporting Project Individual / Consultant for Distance IBRD / 89550 Management, Monitoring, Post Consultant Open 6,000.00 0.00 Canceled 2020-04-17 2020-04-15 2020-06-05 2020-06-26 2020-07-20 2020-08-19 Education and Evaluations Selection Supporting Project Individual GE-MESCS-170383-CS-INDV IBRD / 89550 Management, Monitoring, Prior Consultant Open 360,000.00 60,000.00 Signed 2020-04-30 2020-05-05 2020-06-18 2020-06-05 2020-06-23 2020-06-08 2020-07-17 2020-06-23 2026-03-28 / Executive Director and Evaluations Selection Page 5 GE-MESCS-172041-CS-CDS / Delivery of TAO Administrative and Technical Supporting Project Training to Support the IBRD / 89550 Management, Monitoring, Prior Direct Selection Direct 71,000.00 0.00 Canceled 2020-05-05 2020-05-08 2020-05-15 2020-05-21 2020-07-08 2021-11-30 National Assessment and and Evaluations Examination Center (NAEC) with the Project Implementation Supporting Project GE-MESCS-175943-CS-CDS IBRD / 89550 Management, Monitoring, Post Direct Selection Direct 253,750.00 43,500.00 Signed 2020-05-28 2020-05-28 2020-05-30 2020-05-30 2020-06-03 2020-06-01 2026-03-24 / Project Manager and Evaluations GE-MESCS-168881-CS-INDV- Supporting Project Individual 1 / Consultant for Distance IBRD / 89550 Management, Monitoring, Post Consultant Open 6,000.00 1,331.81 Signed 2020-06-03 2020-05-01 2020-06-23 2020-06-05 2020-07-14 2020-06-08 2020-07-30 2020-07-21 2020-08-29 Education and Evaluations Selection GE-MESCS-184291-CS-INDV Supporting Project Individual / General Education IBRD / 89550 Management, Monitoring, Post Consultant Open 242,875.00 43,500.00 Signed 2020-07-19 2020-07-15 2020-08-14 2020-08-16 2020-08-17 2020-08-16 2020-09-01 2020-09-01 2026-03-04 Component Lead and Evaluations Selection Supporting Project GE-MESCS-190082-CS-CDS IBRD / 89550 Management, Monitoring, Post Direct Selection Direct 1,875.00 1,860.38 Signed 2020-08-30 2020-08-31 2020-09-09 2020-09-15 2020-09-26 2020-09-16 2020-11-10 / Document Flow Specialist and Evaluations GE-MESCS-153941-CS-INDV Improving the Quality of and Individual / Consultant for ECE for IBRD / 89550 Access to Early Childhood Post Consultant Open 31,250.00 0.00 Canceled 2020-07-15 2020-09-02 2020-09-23 2020-10-28 2021-10-28 Ministry of Education, Science, Education and Care Selection Culture and Sports GE-MESCS-153940-CS-INDV Improving the Quality of and Individual / Consultant for ECE for IBRD / 89550 Access to Early Childhood Post Consultant 31,250.00 0.00 Canceled 2020-07-15 2020-09-02 2020-09-23 2020-10-28 2021-10-28 Ministry of Health and Social Education and Care Selection Welfare Supporting Project Individual GE-MESCS-207179-CS-INDV IBRD / 89550 Management, Monitoring, Post Consultant Open 228,375.00 130,500.00 Signed 2020-12-06 2020-12-09 2020-12-30 2021-01-29 2021-01-01 2021-01-29 2021-01-17 2021-03-01 2026-04-01 / Project Manager and Evaluations Selection GE-MESCS-207474-CS-INDV Supporting Project Individual / General Education IBRD / 89550 Management, Monitoring, Post Consultant Open 228,375.00 130,500.00 Signed 2020-12-03 2020-12-09 2021-01-01 2021-02-17 2021-01-03 2021-02-17 2021-01-19 2021-03-11 2026-04-03 Component Lead and Evaluations Selection GE-MESCS-208787-CS-INDV Supporting Project Individual / Early Childhood Education IBRD / 89550 Management, Monitoring, Post Consultant Open 228,375.00 129,600.00 Signed 2020-12-15 2020-12-15 2021-02-02 2021-03-01 2021-02-04 2021-03-01 2021-02-20 2021-03-19 2026-04-25 Component Lead and Evaluations Selection Supporting Project Individual GE-MESCS-156009-CS-INDV Pending IBRD / 89550 Management, Monitoring, Post Consultant Open 50,000.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-08-26 2026-03-01 / Lawyer Implementation and Evaluations Selection GE-MESCS-212224-CS-INDV / Short Term Consultant (International) for effective planning and implementation Supporting Project Individual of procurement on IBRD / 89550 Management, Monitoring, Post Consultant Open 30,000.00 42,980.81 Signed 2021-01-25 2021-02-17 2021-02-28 2021-04-28 2021-03-05 2021-05-07 2021-04-03 2021-05-10 2021-07-02 "Improving ECE institution and Evaluations Selection Management System and Enhancing the Quality of Programs Across the Country" GE-MESCS-212227-CS-INDV / Short Term Consultant (National) for supporting the planning process for Supporting Project Individual implementation of activities IBRD / 89550 Management, Monitoring, Post Consultant Open 12,000.00 5,853.09 Signed 2021-02-16 2021-02-17 2021-03-19 2021-04-28 2021-03-21 2021-05-07 2021-04-06 2021-05-10 2021-07-05 under "Improving ECE and Evaluations Selection institution Management System and Enhancing the Quality of Programs Across the Country" GE-MESCS-212277-CS-INDV / Short Term Consultant (International) for supporting Supporting Project Individual the planning process and IBRD / 89550 Management, Monitoring, Post Consultant Open 30,000.00 46,649.09 Signed 2021-01-25 2021-02-17 2021-02-11 2021-04-16 2021-02-25 2021-04-23 2021-03-26 2021-04-26 2021-05-25 Implementation of and Evaluations Selection procurement on "Fostering Quality Teaching and Learning in General Education" GE-MESCS-212279-CS-INDV / Short Term Consultant (International) for supporting Supporting Project Individual the planning process for the Under IBRD / 89550 Management, Monitoring, Post Consultant Open 30,000.00 0.00 2021-04-15 2021-04-23 2021-06-03 2021-06-17 2021-07-22 2021-09-20 procurement on Information Implementation and Evaluations Selection Management Database System for New Model of HE Performance-based Funding GE-MESCS-212281-CS-INDV / Short Term Consultant (International) for Supporting Supporting Project Individual the planning and Pending IBRD / 89550 Management, Monitoring, Post Consultant Open 30,000.00 0.00 2021-10-15 2021-11-17 2021-12-01 2022-01-05 2022-03-06 Implementation of Implementation and Evaluations Selection procurement on "Promoting the Internationalization of Higher Education" GE-MESCS-212282-CS-INDV / Short Term Consultant (National) for supporting the Supporting Project Individual planning process for Pending IBRD / 89550 Management, Monitoring, Post Consultant Open 12,000.00 0.00 2021-10-25 2021-12-02 2021-12-16 2022-01-04 2022-03-05 Implementation of Implementation and Evaluations Selection "Promotion of the Internationalization of Higher Education" Page 6 GE-MESCS-212345-CS-INDV / Short Term Consultant (International) for supporting the effective planning and implementation of the Supporting Project Individual Under procurement on IBRD / 89550 Management, Monitoring, Post Consultant Open 30,000.00 0.00 2021-05-20 2021-06-21 2021-06-19 2021-07-03 2021-08-07 2021-10-06 Implementation "Strengthening the Quality of and Evaluations Selection Pre-service Teacher Education Programs and Continuous Professional Development Options" GE-MESCS-212346-CS-INDV / Short Term Consultant (National) for supporting the planning process for Supporting Project Individual implementation of Under IBRD / 89550 Management, Monitoring, Post Consultant Open 12,000.00 0.00 2021-05-25 2021-06-21 2021-06-24 2021-07-08 2021-08-12 2021-10-11 "Strengthening the Quality of Implementation and Evaluations Selection Pre-service Teacher Education Programs and Continuous Professional Development Options" GE-MESCS-212353-CS-INDV / Short Term Consultant Supporting Project Individual (International) for support the Pending IBRD / 89550 Management, Monitoring, Post Consultant Open 30,000.00 0.00 2021-09-27 2021-11-08 2021-11-22 2022-01-05 2022-03-06 planning and Implementation Implementation and Evaluations Selection of the Capacity Building of EMIS GE-MESCS-212354-CS-INDV / Short Term Consultant Supporting Project Individual Pending (National) for Support and IBRD / 89550 Management, Monitoring, Post Consultant Open 72,000.00 0.00 2022-05-16 2022-07-04 2022-07-25 2022-08-29 2024-08-28 Implementation Implementation of the and Evaluations Selection Capacity Building of EMIS GE-MESCS-212358-CS-INDV / Short Term Consultant (National) for supporting Supporting Project Individual effective Implementation of Pending IBRD / 89550 Management, Monitoring, Post Consultant Open 12,000.00 0.00 2021-11-15 2021-12-15 2021-12-29 2022-02-02 2022-05-03 the "Design and Development Implementation and Evaluations Selection of LMS and EMS for the National Education System and its Beneficiaries" Supporting Project Individual GE-MESCS-156088-CS-INDV IBRD / 89550 Management, Monitoring, Post Consultant Open 75,000.00 0.00 Canceled 2020-02-10 2020-03-30 2020-04-20 2020-05-25 2026-02-23 / IT specialist and Evaluations Selection Supporting Project GE-MESCS-217879-CS-CDS IBRD / 89550 Management, Monitoring, Post Direct Selection Direct 30,000.00 18,000.00 Signed 2021-02-15 2021-02-17 2021-02-25 2021-03-01 2021-03-15 2021-03-01 2026-03-09 / IT Specialist and Evaluations GE-MESCS-218194-CS-INDV / Short Term Consultant (National) for supporting the Supporting Project Individual planning process and IBRD / 89550 Management, Monitoring, Post Consultant Open 12,000.00 6,154.74 Signed 2021-03-01 2021-02-17 2021-03-31 2021-04-12 2021-04-02 2021-04-23 2021-04-21 2021-04-26 2021-07-20 Implementation of "Fostering and Evaluations Selection Quality Teaching and Learning in General Education" GE-MESCS-219062-CS-INDV / Short Term Consultant Individual (International) for Support System Strengthening and IBRD / 89550 Post Consultant Open 45,000.00 30,045.66 Signed 2021-03-08 2021-03-01 2021-04-22 2021-04-14 2021-05-13 2021-04-16 2021-06-01 2021-04-26 2021-10-29 Preparation of Early Childhood Stakeholder Communication Selection and General Education Sector Strategy and Action Plan GE-MESCS-219063-CS-INDV / Short-Term Consultant (International) for Support Individual System Strengthening and Preparation of Higher IBRD / 89550 Post Consultant Open 45,000.00 36,453.50 Signed 2021-03-08 2021-03-02 2021-04-22 2021-04-15 2021-05-13 2021-04-26 2021-06-01 2021-05-03 2021-10-29 Stakeholder Communication Education, Research and Selection Innovation Strategy and Action Plan GE-MESCS-219065-CS-INDV / Short-Term Consultant Individual (National) for Support in System Strengthening and IBRD / 89550 Post Consultant Open 10,000.00 9,492.75 Signed 2021-03-08 2021-03-02 2021-04-22 2021-04-14 2021-05-13 2021-04-16 2021-05-29 2021-04-26 2021-10-26 Preparation of Science sub- Stakeholder Communication Selection Sector Strategy and Action Plan GE-MESCS-219068-CS-INDV / Short-Term Consultant Individual (National) for Support in System Strengthening and IBRD / 89550 Post Consultant Open 10,000.00 3,768.12 Signed 2021-03-08 2021-03-02 2021-04-22 2021-04-15 2021-05-13 2021-04-22 2021-05-29 2021-04-26 2021-10-26 Preparation of Early Childhood Stakeholder Communication Selection Education Sub-Sector Strategy and Action Plan GE-MESCS-219069-CS-INDV / Short-Term Consultant Individual (National) for Support in System Strengthening and IBRD / 89550 Post Consultant Open 10,000.00 10,605.62 Signed 2021-03-08 2021-03-02 2021-04-22 2021-04-14 2021-05-13 2021-04-16 2021-05-29 2021-04-26 2021-10-26 Preparation of General Stakeholder Communication Selection Education Sub-Sector Strategy and Action Plan GE-MESCS-219071-CS-INDV / Short-Term Consultant Individual (National) for Support in System Strengthening and IBRD / 89550 Post Consultant Open 10,000.00 9,565.22 Signed 2021-03-08 2021-03-02 2021-04-22 2021-04-14 2021-05-13 2021-04-16 2021-05-29 2021-04-26 2021-10-26 Preparation of Higher Stakeholder Communication Selection Education sub-Sector Strategy and Action Plan GE-MESCS-222203-CS-CDS / Delivery of TAO Fostering Quality Teaching Administrative and Technical IBRD / 89550 and Learning in General Prior Direct Selection Direct 32,000.00 31,854.35 Signed 2021-03-05 2021-03-03 2021-03-15 2021-03-10 2021-04-05 2021-03-16 2021-07-04 Training to Support the NAEC Education with the Project Implementation GE-MESCS-227984-CS-INDV / Short-Term Consultant Strengthening Financing Individual (International) for the Options and Promoting IBRD / 89550 Post Consultant Open 30,000.00 29,880.36 Signed 2021-04-12 2021-04-16 2021-05-27 2021-06-15 2021-06-03 2021-06-21 2021-06-22 2021-06-23 2021-11-19 Preparation of the Full Internationalization in Higher Selection Package of Regulatory Education Documents for CIF Page 7 GE-MESCS-227985-CS-INDV / Short-Term Consultant Strengthening Financing Individual (National)/ Legal Expert for Options and Promoting IBRD / 89550 Post Consultant Open 9,000.00 8,571.43 Signed 2021-04-13 2021-04-16 2021-05-28 2021-06-21 2021-06-04 2021-06-21 2021-06-23 2021-06-23 2021-11-20 the Preparation of the Full Internationalization in Higher Selection Package of Regulatory Education Documents for CIF GE-MESCS-227986-CS-INDV / Short-Term Consultant Strengthening Financing (National)/ Expert in Individual Options and Promoting Education Law for the IBRD / 89550 Post Consultant Open 9,000.00 0.00 Canceled 2021-04-13 2021-04-08 2021-05-28 2021-06-04 2021-06-23 2021-11-20 Internationalization in Higher Preparation of the Full Selection Education Package of Regulatory Documents for CIF GE-MESCS-212357-CS-INDV / Short Term Consultant (National) for supporting Supporting Project Individual effective Implementation of Pending IBRD / 89550 Management, Monitoring, Post Consultant Open 12,000.00 0.00 2021-08-20 2021-09-19 2021-10-03 2021-11-07 2022-02-05 the "Design and Development Implementation and Evaluations Selection of LMS and EMS for the National Education System and its Beneficiaries" GE-MESCS-228848-CS-INDV / Short-term Consultant (International) to Support the Fostering Quality Teaching Individual National Assessment and Under IBRD / 89550 and Learning in General Post Consultant Open 30,000.00 0.00 2021-04-25 2021-04-14 2021-06-09 2021-06-16 2021-07-05 2021-10-03 Examination Center with the Implementation Education Selection Development of National Assessment Policy Framework for General Education Level GE-MESCS-228849-CS-INDV / Short-term Consultant for Fostering Quality Teaching Individual Support in Development of Under IBRD / 89550 and Learning in General Post Consultant Open 30,000.00 0.00 2021-04-25 2021-04-28 2021-06-09 2021-06-16 2021-07-05 2021-10-03 National Quality Assurance Implementation Education Selection Policy Framework for General Education Level GE-MESCS-229670-CS-INDV / Short-Term Consultant Strengthening Financing Individual (National)/ Higher Education Options and Promoting IBRD / 89550 Post Consultant Open 9,000.00 7,142.86 Signed 2021-04-26 2021-04-20 2021-06-10 2021-06-15 2021-06-17 2021-06-22 2021-07-06 2021-06-23 2021-12-03 Specialist for the Preparation Internationalization in Higher Selection of the Full Package of Education Regulatory Documents for CIF GE-MESCS-234636-CS-CDS Strengthening Financing / TIMSS (Trends in Options and Promoting IBRD / 89550 Post Direct Selection Direct 665,000.00 665,310.00 Signed 2021-05-18 2021-05-17 2021-05-28 2021-05-18 2021-06-12 2021-05-24 2025-11-18 International Mathematics and Internationalization in Higher Science Study) 2023 Project Education Page 8 PROCUREMENT PLAN Activity Description Estima Type Selecti Review Contract Contract Packa te Cost of on by Signing Complet ge/Co (US$)1 Procu Metho Bank Date ion Date ntract reme d (Prior/ (Planned) (planne Ref. nt Post) d) No. 1 2 3 4 5 6 7 8 Component 1: EITI Reporting and Validation CS CQS Post April-May Septemb Preparation of the first 1.1 120,00 2018 er 2018 EITI Report 0 Preparation of the CS CQS Post April-May Novembe 1.2 second EITI Report 96,000 2018 r 2019 Scoping study for the CS CQS/IC Post May 2019 May 1.3 second and third years 2020 18,000 (2) Component 2: Capacity Building and mainstreaming Trainings for MSG CS CQS/IC Post 2018 2020 members&Trainings 2.1 and consultancy for 36,000 related ministers staff (mult.) Component 3: Communication and Outreach Development of 6,000 CS CQS Post 2018 2020 electronic tools for data 3.1 analysis (software development) Procurement of Photo GO DS Post 2018 2020 3.2 2,400 Camera 3.3 Printing 6,000 NCS RFQ Post 2018 2020 Social Media 17,550 CS/NC CQS/IC/ Post 2018 2020 3.4 S RFQ 1 The amount of local taxes is indicative. Only 20% of VAT for firms and 35% of income tax for Individuals were included in the amount of total estimated cost. The exact amount of the local taxes will be calculated during contract negotiation/signing, in accordance with the legislation of RA 1 Component 4: Beneficial Ownership Disclosure and Project Management Development of 18,000 CS CQS Post 2018 2020 Software for Beneficial 4.1 Ownership Disclosure register Audit of the project CS CQS Post 2020 4.2 12,000 2 PROCUREMENT Armenia : Armenia EITI Support PLAN General Information Country: Armenia Bank’s Approval Date of the Original Procurement Plan: 2018-04-19 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166274 GPN Date: Project Name: Armenia EITI Support Loan / Credit No: TF / A6768 MSP-PMU-OPM Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EITI-GO-3-2 / Procurement TF / A6768 Communication and Outreach Post Direct Selection Direct 2,400.00 1,732.85 Completed 2018-10-18 2018-10-24 2018-10-23 2018-10-26 2018-10-31 2018-12-26 2018-11-10 2018-12-27 of Digital Camera NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EITI-NC-3-4 / Social Media Services (Production and Request for Single Stage - One TF / A6768 Communication and Outreach Post Limited 12,000.00 8,957.78 Completed 2018-12-03 2018-12-05 2018-12-22 2019-01-16 2019-11-29 2019-12-18 dissemination/boosting of Quotations Envelope informative videos) EITI-NC-3-3/1 / Printing Request for Single Stage - One TF / A6768 Communication and Outreach Post Limited 3,000.00 1,749.80 Completed 2018-12-16 2018-12-21 2019-01-04 2019-01-18 2019-01-25 2019-02-08 Services Quotations Envelope Pending EITI-NC-3-3-1 / Printing Request for Single Stage - One TF / A6768 Communication and Outreach Post Limited 2,400.00 0.00 Implementati 2021-06-02 2021-06-21 2021-07-12 Services Quotations Envelope on Pending EITI-NC-3-4-1 / Social Request for Single Stage - One TF / A6768 Communication and Outreach Post Limited 8,400.00 0.00 Implementati 2021-06-04 2021-06-23 2021-07-22 media services Quotations Envelope on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EITI-CS-1-1 / Independent Consultant Administrator (Consultant) for TF / A6768 EITI Implementation Support Post Qualification Limited 120,000.00 107,516.59 Completed 2018-04-23 2018-04-13 2018-05-07 2018-05-30 2018-06-06 2018-07-06 2018-07-11 2018-07-16 2018-10-31 2019-02-05 the 2018 EITI Report, Republic Selection of Armenia EITI-CS-1-2 / Independent Consultant Administrator (Consultant) for TF / A6768 EITI Implementation Support Post Qualification Open - National 96,000.00 77,198.68 Completed 2019-05-06 2019-06-13 2019-05-20 2019-10-28 2019-06-24 2019-10-21 2019-07-04 2019-12-13 2019-07-07 2019-12-17 2020-01-03 2020-10-13 the Republic of Armenia 2019 Selection EITI Report EITI-CS-4-1 / Development Consultant Beneficial Ownership and of Software for Beneficial TF / A6768 Post Qualification Open - National 36,000.00 26,940.56 Completed 2019-09-06 2019-10-08 2019-09-27 2019-11-01 2020-02-05 2019-11-15 2020-05-07 2019-12-08 2020-05-12 2019-12-20 2020-12-10 Project Management Ownership Disclosure register Selection EITI-CS-1-3 / Consultant Consultant (Independent Administrator) TF / A6768 EITI Implementation Support Post Qualification Open - National 108,000.00 91,027.33 Signed 2020-06-18 2020-07-14 2020-07-02 2020-07-28 2020-08-06 2020-09-11 2020-08-16 2020-11-09 2020-08-19 2020-11-09 2021-02-10 for the 2019 EITI Report and Selection Scoping Study of Armenia INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EITI-CS-3-1 / Development of electronic tools for data TF / A6768 Communication and Outreach Post Direct Selection Direct 6,000.00 5,948.13 Completed 2019-06-14 2019-06-20 2019-06-24 2019-07-04 2019-07-02 2019-09-02 2019-09-30 2019-12-13 analysis (software development) EITI-CS-4-2 / Audit of the Beneficial Ownership and Under TF / A6768 Post Direct Selection Direct 6,000.00 0.00 2021-05-19 2021-05-17 2021-06-08 2021-07-08 2021-10-01 project Project Management Implementation Page 1 Nigeria For Women Project PROCUREMENT PLAN (Textual Part) Project information: [Nigeria] [Nigeria For Women Project] P161364] Project Implementation agency: [Federal Ministry of Women Affairs and Social Development] Date of the Procurement Plan: [August 31, 2018] Period covered by this Procurement Plan: [August 31,2018 to December 2019] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works).Not Applicable. Goods: is not applicable Works: is not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable Other Relevant Procurement Information. The project will use the CDD procurement under this project. CDD manual will be produced by the project. PROCUREMENT Nigeria : Nigeria For Women Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2020-12-04 2021-06-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161364 GPN Date: Project Name: Nigeria For Women Project Loan / Credit No: IDA / 62710 NFWP-Niger State Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG/NFW/GO/RFQ/2020/02 / Project Management, Under Request for Single Stage - One Procurement of 16 seater Bus IDA / 62710 Monitoring and Evaluation Post Limited 88,889.00 0.00 Implementati 2020-12-14 2020-12-24 2021-01-25 2021-03-01 Quotations Envelope for Niger SPCU and Learning on NG/NFW/GO/RFQ/2020/03 / Project Management, Request for Single Stage - One Procurement of 111NO. IDA / 62710 Monitoring and Evaluation Post Limited 38,531.00 0.00 Canceled 2020-11-23 2021-01-11 2021-01-18 2021-07-17 Quotations Envelope Tablets for WFs in 3 LGAs and Learning NG-NFWP-NIGER STATE- Project Management, 209186-GO-DIR / IDA / 62710 Monitoring and Evaluation Post Direct Selection Direct 3,334.00 3,039.90 Signed 2020-12-14 2020-12-21 2020-12-16 2020-12-21 2020-12-30 2020-12-29 2021-01-20 Procurement of Flexible and Learning Accounting Software NG-NFWP-NIGER STATE- 215695-GO-RFQ / Request for Single Stage - One IDA / 62710 Building Social Capital Post Limited 98,421.00 0.00 Canceled 2021-02-06 2021-04-03 2021-09-30 Procurement of 2,000 Nos. Quotations Envelope Savings Kits NG-NFWP-NIGER STATE- Under 215696-GO-RFQ / Request for Single Stage - One IDA / 62710 Building Social Capital Post Limited 77,676.00 0.00 Implementati 2021-01-30 2021-03-27 2021-09-23 Procurement of Additional Quotations Envelope on 230 Nos Tablets NG-NFWP-NIGER STATE- 215698-GO-RFQ / Pending Request for Single Stage - One Procurement of COVID-19 IDA / 62710 Building Social Capital Post Limited 97,368.00 0.00 Implementati 2021-01-30 2021-03-27 2021-09-23 Quotations Envelope Preventive Kits for WAGs and on Step down training of WFs NG-NFWP-NIGER STATE- Pending 221956-GO-RFQ / Request for Single Stage - One IDA / 62710 Building Social Capital Post Limited 61,053.00 0.00 Implementati 2021-03-08 2021-03-22 2021-04-21 Procurement of 1000 nos. Quotations Envelope on Savings kits-Batch 1 NG-NFWP-NIGER STATE- Pending 221957-GO-RFQ / Request for Single Stage - One IDA / 62710 Building Social Capital Post Limited 61,053.00 0.00 Implementati 2021-06-07 2021-06-29 2021-07-26 Procurement of 1000nos. Quotations Envelope on Savings kits for WAGs-Batch 2 NG-NFWP-NIGER STATE- 228965-GO-RFQ / Project Management, Pending Procurement of additional 12 Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 17,632.00 0.00 Implementati 2021-04-21 2021-05-06 2021-05-20 nos. laptops, 1 no. desktop, Quotations Envelope and Learning on 25 nos. anti virus and 5 nos. flash NG-NFWP-NIGER STATE- Project Management, Pending 234655-GO-DIR / IDA / 62710 Monitoring and Evaluation Post Direct Selection Direct 82,776.00 0.00 Implementati 2021-05-26 2021-05-27 2021-06-12 2021-07-03 Procurement of 16 Sitter bus, and Learning on high roof NG-NFWP-NIGER STATE- Project Management, Pending 238358-GO-RFQ / Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 130,000.00 0.00 Implementati 2021-06-13 2021-06-25 2021-07-25 Procurement of 2 nos. 4x4 Quotations Envelope and Learning on Vehicles for supervision. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-NFWP-NIGER STATE- Project Management, Pending 221958-NC-RFQ / Request for Single Stage - One IDA / 62710 Monitoring and Evaluation Post Limited 6,902.00 0.00 Implementati 2021-03-09 2021-03-25 2021-04-07 Procurement of Insuring 1 Quotations Envelope and Learning on Hilux and 1 Bus CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 NG-NFWP-NIGER STATE- Project Management, Individual 214894-CS-INDV / IDA / 62710 Monitoring and Evaluation Post Consultant Limited 18,947.00 0.00 Under Review 2021-01-19 2020-12-22 2021-01-24 2021-02-14 2021-03-21 2021-09-17 Engagement of BCC Advisor and Learning Selection NG-NFWP-NIGER STATE- Project Management, Individual 214906-CS-INDV / IDA / 62710 Monitoring and Evaluation Post Consultant Limited 18,947.00 0.00 Under Review 2021-01-19 2021-01-19 2021-01-24 2021-02-14 2021-03-21 2021-09-17 Engagement of Livelihood and Learning Selection Advisor NG-NFWP-NIGER STATE- Project Management, 230643-CS-CDS / Under IDA / 62710 Monitoring and Evaluation Post Direct Selection Direct 3,947.00 0.00 2021-04-21 2021-04-26 2021-04-24 2021-04-27 2021-04-30 Engagement of External Implementation and Learning Auditor. Page 2 18 MONTHS PROCUREMENT PLAN-IRISE PROJECT Project information: Liberia Improving Results in Secondary Education Project - P164932 Project Implementation Agency: Ministry of Education, Liberia Date of the Procurement Plan: June 2019 Period covered by this Procurement Plan: June 2019 to January 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right 1 to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the REDISSE II project): Thresholds*, Procurement Methods, and Prior Review for Substantial Risk Thresholds for Expenditure Procurement Procurement Contracts Subject to No Category Methods* [eq. Method Prior Review /[eq. US$] USD] All contracts at or above Open Competition USD10,000,000 are subject to International Market international advertising and the C ≥ 5,000,000 Approach and Direct use of the Bank’s SPDs (or other Contracting documents agreed with the 1 Works Bank). Open Competition National Market 200,000 < C < 5,000,000 None Approach 2 Thresholds for Expenditure Procurement Procurement Contracts Subject to No Category Methods* [eq. Method Prior Review /[eq. US$] USD] C ≤ 200,000 RfQ None All contracts at or above Open Competition USD2,000,000 are subject to International Market international advertising and the C ≥ 500,000 Approach and Direct use of the Bank’s SPDs (or other Goods, IT and Contracting documents agreed with the 2 non-consulting Bank). services Open Competition National Market 100,000 < C < 500,000 None Approach C ≤ 100,000 RfQ None All contracts at or above USD500,000 are subject to for international advertising and the C < 100,000 Consulting Services use of the Bank’s SPDs (or other National documents agreed with the shortlist for Bank). 3 selection of All contracts at or above consultant firms for USD500,000 are subject to Engineering and international advertising and the C ≤ 200,000 Construction use of the Bank’s SPDs (or other Supervision documents agreed with the Bank). Selection of All values ≥ 300,000 4 Individual All Approaches consultants Training, Based on approved Workshops, This line activity is not subject 5 All Values Annual Work Plan & Study Tours to procurement Review. Budgets (AWPB) by TTL (Special procurement arrangements like us of: Direct Selection. It is not expected that there will need for prequalification in the procurement arrangements under Liberia Secondary Education Teaching for Results Project) *These thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The MoE team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None 3 Procurement Packages/Plan with Procurement Arrangements and Time Schedule: as per the table below: b) PROCUREMENT PLAN Works 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procureme Prequ National Review Expected Expected Comme No. (Description) Cost nt Method/ alifica Prefere by bid Contract nts US$ Arrangeme tion nce Bank opening Signature million nt (yes/n (yes/no) (Prior / date Date o) Post) 1. Refurbishment 5,000.00 Limited Post No Post Oct-1, Oct- 30, of offices and National 2019 2019 facilities for the RFQ PDT 2. Construction of 3 3,300,000. Open, Post No Post Jul-30, Oct-30, new high 00 National, 2020 2020 schools RFB 3. Expansion of 23 4,025,000. Open, Post No Post Jul-30, Oct-30, junior high 00 National, 2020 2020 schools in rural RFB areas 4. Expansion of 2 350,000 CDD Post No Post Jul-30, Oct-30, junior high 2020 2020 schools in rural areas as demonstration schools using community development- driven approach 5. School 6,005,000. Community- Post No Post Oct-2020 Dec-21, This may rehabilitation 00 driven 2020 be and renovation Developme determin nt (CDD) ed after a mid- term review of the project Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimate Procurem Prequali National Review Expected Expected Comme No. (Description) d ent fication Prefere by bid Contract nts Cost Method/ (yes/no) nce Bank opening Signatur US$ Arrangem (yes/no) (Prior / date e Date million ent Post) 1. Procurement of 7,000.00 Limited, Post No Post Oct-15, Nov-5, office furniture National 2019 2019 for the PDT RFQ 4 2. Procurement of 10,000.0 Limited, Post No Post Oct-15, Nov-5, office 0 National 2019 2019 equipment for RFQ the PDT Consultancy Services 1 2 3 4 5 6 7 8 Ref. No. Description of Assignment Estimate Selection Review Expected Expected Comme d Method/ by date of Contract nts Cost Arrangeme Bank proposal Signature US$ nt (Prior / submissio Date Post) n 1. Consulting services for 150,000.0 Limited, Post Nov-15, Jan-15, 2020 developing design standards, 0 National, 2019 drawings, specifications as well CQS as bills of quantity (national school construction strategy) 2. Consulting services for the 750,000.0 Open , Post Oct-16, Dec-16, 2020 construction supervision 0 National 2020 QCBS 3. Consulting services to support 100,000.0 Limited, Post Nov-11, Dec-10, 2019 girls’ education interventions 0 National 2019 to remove barriers to transition INDV and completion (design girls’ scholarship program, define the role of female guidance counsellors and develop training modules and set up community engagement framework and operational plan). 4. Consulting services for 720,000.0 Open, Post Dec-16, Feb-20, 2020 development of the feedback- 0 National, 2019 based training system, in QCBS particular the development and delivery of the training materials and program 5. Consulting services for the 750,000.0 Open, Post Aug- Oct-30,2019 hiring of an Independent 0 National, 1,2019 Verification Agency QCBS 6. Consulting services to review 400,000.0 Open, Post Nov- Jan-20,2020 and revamp the existing pre- 0 National, 20,2019 service teacher training QCBS program at University of Liberia 7. Consulting services to develop 100,000.0 Open, Post Mar-9, May-4, 2020 a teaching workforce planning 0 National, 2020 and management system CQS 8. Consulting services to develop 150,000.0 Open, Post Dec-16, Feb-20, 2020 a textbook management 0 National, 2019 system and build capacity at CQS the Center for Curriculum and Textbook Research to maintain the system 5 9. Consulting services to develop 150,000.0 Open, Post Sept-10, Nov-10, 2020 a textbook application and 0 National, 2020 digital platform for making CQS textbooks available online and building capacity of the MoE to maintain the platform 10. Consulting services to support 1,250,000 Open, Prior Nov-15, Jan-6, 2020 development of textbooks for .00 Internation 2019 five subject areas (Math, al, QCBS English, Physics, Chemistry and Biology) for grades 10, 11 and 12. 11. Consulting services to develop 200,000.0 Open, Post Nov-26, Jan-27, 2020 an ICT strategy for the 0 National, 2019 integration of digital CQS technology in education 12. Consulting services to conduct 500,000.0 Open, Post Sep-16, Nov-18, 2019 a feasibility study of capacity- 0 Internation 2019 building needs of MoE and al, QCBS education institutions involved in the project implementation and developing programs to address the identified capacity gaps. 13. Hiring of an International 180,000.0 Open, Prior Aug-15, Oct-15, 2019 Procurement Specialist 0 International, 2019 INDV 14. Hiring of a National Contract 48,000.00 Limited, Post Apr-15, Jun-30, 2020 Management Specialist National 2020 INDV Training and Workshop (Training & Workshop activities are subject to TTL clearance) Estimat Estimated Expected Comment Ref. Training, workshop and study s ed Cost Duration Training/work No. tours (US$) (Days) shop Date 1. 15,000.0 TBA TBA Project launch workshop 0 3. Training in Selection and 30,000.0 TBA TBA Employment of Consultants and 0 Contract Management GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: 6 These are expenditures incurred by the Recipient to finance: (i) the salaries of locally contracted support staff of the Project entities and units involved in Project implementation (excluding civil servants) and state contributions thereon; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance and insurance; (iv) communication technology (including, without limitation, internet and telephone) and maintenance of equipment; (v) rental expenses and utilities; (vi) building security and maintenance; (vii) translations services, photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 7 regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 8 We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 9 PROCUREMENT Liberia : Improving Results in Secondary Education (IRISE) PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2019-11-06 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164932 GPN Date: 2019-11-11 Project Name: Improving Results in Secondary Education (IRISE) Loan / Credit No: IDA / D5030 M Executing Agency(ies): inistry of Education WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity building, technical LR-MOE-138143-GO-RFQ / assistance, project Request for Single Stage - One 2021-01- Refurbishment of offices and IDA / D5030 Post Limited 0.00 Canceled 2020-08-11 2020-09-18 2020-10-06 coordination, and monitoring Quotations Envelope 04 facilities for the PDT and evaluation LR-MOE-138240-CW-CDD / Improving access and Community Driven 2022-05- School rehabilitation and IDA / D5030 learning environment at the Post Limited 0.00 Canceled 2021-01-25 2021-01-30 2021-03-13 2021-04-12 2021-05-17 Development 17 renovation senior secondary level LR-MOE-138239-CW-RFB / Improving access and Pending Expansion of 2 junior high Community Driven 2022-09- IDA / D5030 learning environment at the Post Limited 0.00 Implementat 2021-05-14 2021-05-19 2021-06-30 2021-07-30 2021-09-03 schools in rural areas as Development 03 senior secondary level ion demonstration schools LR-MOE-138237-CW-RFB / Improving access and Pending Single Stage - One 2022-09- Construction of 3 new high IDA / D5030 learning environment at the Post Request for Bids Open - National 0.00 Implementat 2021-05-21 2021-05-26 2021-07-07 2021-08-06 2021-09-10 Envelope 10 schools senior secondary level ion Request for LR-MOE-138238-CW-RFB / Improving access and Bids - Small Pending Single Stage - One 2022-09- Expansion of 23 junior high IDA / D5030 learning environment at the Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-05-21 2021-05-26 2021-07-07 2021-08-06 2021-09-10 Envelope 10 schools senior secondary level envelope ion process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity building, technical LR-MOE-138792-GO-RFQ / assistance, project Request for Single Stage - One Procurement of office IDA / D5030 Post Limited 5,970.00 Signed 2019-12-23 2020-01-08 2020-02-17 2020-01-27 2020-08-15 coordination, and monitoring Quotations Envelope furniture for the PDT and evaluation Capacity building, technical LR-MOE-138793-GO-RFQ / assistance, project Request for Single Stage - One Procurement of office IDA / D5030 Post Limited 11,730.00 Signed 2019-12-18 2019-12-20 2020-02-12 2020-01-27 2020-08-10 coordination, and monitoring Quotations Envelope equipment for the PDT and evaluation LR-MOE-173177-GO-RFQ / Capacity building, technical Procurement of 2No. Cross- assistance, project Request for Single Stage - One IDA / D5030 Post Limited 90,600.00 Signed 2020-06-10 2020-06-04 2020-08-05 2020-07-20 2021-02-01 Country Vehicles for coordination, and monitoring Quotations Envelope Monitoring and evaluation LR-MOE-180979-GO-RFQ / Supply and Delivery of Medical Contingency Emergency Request for Single Stage - One and Non medical materials for IDA / D5030 Post Limited 0.00 Canceled 2020-06-29 2020-06-24 2020-08-24 2021-02-20 Response Component (CERC) Quotations Envelope Private Schools 12 graders- CERC LR-MOE-200331-GO-DIR / For the Delivery of Outputs - Contingency Emergency Supply And Delivery Of Health IDA / D5030 Prior Direct Selection Direct 1,212,318.35 Signed 2020-10-22 2020-11-05 2020-10-27 2020-11-09 2020-12-01 2020-11-20 2021-05-30 Response Component (CERC) Kits To 3400 private Schools In Liberia LR-MOE-223779-GO-RFQ / Procurement of Laptop Computers, Printers and Other Capacity building, technical Under Office Equipment to replace assistance, project Request for Single Stage - One IDA / D5030 Post Limited 0.00 Implementati 2021-04-17 2021-05-12 2021-06-12 2021-12-09 damaged equipment and to coordination, and monitoring Quotations Envelope on resource MOE Procurement and evaluation and Finance Offices to deliver on the IRISE Project NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOE-181088-NC-RFQ / Printing of IEC, Posters and Contingency Emergency Request for Single Stage - One IDA / D5030 Post Limited 0.00 Canceled 2020-07-29 2020-06-24 2020-09-23 2021-03-22 Protocols for private schools Response Component (CERC) Quotations Envelope 12 graders CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOE-138734-CS-CQS / Consulting services for Improving access and Consultant developing design standards, IDA / D5030 learning environment at the Post Qualification Open - National 287,304.35 Signed 2019-12-30 2019-12-06 2020-01-20 2020-02-12 2020-03-04 2020-04-13 2020-04-03 2020-07-13 2020-05-08 2020-08-10 2021-05-08 drawings, specifications as senior secondary level Selection well as bills of quantity Page 1 LR-MOE-138249-CS-CQS / Consulting services to develop Improving quality and Consultant an ICT strategy for the IDA / D5030 relevance of senior secondary Post Qualification Open - National 115,781.05 Signed 2020-02-02 2020-06-05 2020-02-23 2020-06-27 2020-04-07 2020-09-27 2020-05-07 2021-02-01 2020-06-11 2021-02-25 2021-06-11 integration of digital education Selection technology in education LR-MOE-138737-CS-QCBS / Improving access and Quality And Cost- Hiring of TA for construction IDA / D5030 learning environment at the Post Open - National 0.00 Canceled 2019-12-30 2020-01-20 2020-03-04 2020-04-01 2020-05-01 2020-06-05 2020-07-10 2021-07-10 Based Selection supervision senior secondary level Capacity building, technical LR-MOE-138790-CS-QCBS / assistance, project Quality And Cost- Hire Independent Verification IDA / D5030 Post Open - National 0.00 Canceled 2019-12-20 2019-11-14 2020-01-10 2019-11-20 2020-02-23 2020-01-02 2020-03-22 2020-04-21 2020-05-26 2020-06-30 2021-06-30 coordination, and monitoring Based Selection Agency and evaluation LR-MOE-138244-CS-QCBS / Consulting services to review Improving quality and and revamp the existing pre- Quality And Cost- Under IDA / D5030 relevance of senior secondary Prior Open - International 0.00 2020-08-30 2020-09-10 2020-09-20 2020-10-07 2020-11-03 2021-03-02 2020-12-01 2021-03-24 2020-12-31 2021-06-17 2021-02-04 2021-03-11 2022-03-11 service teacher training Based Selection Implementation education program at University of Liberia LR-MOE-173181-CS-CQS / Technical Assistance for Increasing opportunities for Consultant Supporting Safer Learning girls to transition to and IDA / D5030 Post Qualification 0.00 Canceled 2020-10-15 2020-11-05 2020-12-19 2021-01-18 2021-02-22 2021-08-21 Environment - Female complete senior secondary Selection Guidance & Counseling education Program LR-MOE-138728-CS-CQS / Improving access and Consultant Hire Technical Assistant (TA)- IDA / D5030 learning environment at the Post Qualification Open - National 0.00 Canceled 2020-08-16 2020-09-06 2020-10-20 2020-11-19 2020-12-24 2021-12-24 Archetecture Firm senior secondary level Selection LR-MOE-173173-CS-CQS / Improving quality and Consultant Hire Technical Assistant for IDA / D5030 relevance of senior secondary Post Qualification Open - National 0.00 Canceled 2020-08-25 2020-09-15 2020-10-29 2020-11-28 2021-01-02 2021-07-01 Safeguards under School education Selection Construction LR-MOE-173175-CS-CQS / Consulting Services for Improving access and Consultant Integrating digital technology IDA / D5030 learning environment at the Post Qualification Open - International 0.00 Canceled 2020-06-30 2020-06-29 2020-07-21 2020-07-07 2020-09-03 2020-10-03 2020-11-07 2021-05-06 to teaching and learning at senior secondary level Selection the University of Liberia LR-MOE-138245-CS-CQS / Improving quality and Consultant Consulting services to develop Under IDA / D5030 relevance of senior secondary Post Qualification Open - National 0.00 2020-10-30 2020-12-17 2020-11-20 2021-01-25 2021-01-03 2021-04-05 2021-02-02 2021-03-09 2022-03-09 a teaching workforce planning Implementation education Selection and management strategy LR-MOE-159316-CS-QCBS / Hire a firm to develop a Improving quality and Quality And Cost- Under continuous professional IDA / D5030 relevance of senior secondary Prior Open - International 0.00 2020-11-15 2020-12-07 2020-12-06 2021-01-25 2021-01-19 2021-04-14 2021-02-16 2021-06-01 2021-03-18 2021-04-22 2021-05-27 2022-05-27 Based Selection Implementation development feedback-based education training program LR-MOE-173192-CS-QCBS / Capacity building, technical Procurement Services for assistance, project Quality And Cost- IDA / D5030 Post Open - International 0.00 Canceled 2020-05-20 2020-06-03 2020-06-10 2020-06-18 2020-07-24 2020-08-21 2020-09-20 2020-10-25 2020-11-29 2021-11-29 Independent Verification coordination, and monitoring Based Selection Agency and evaluation Improving access and LR-MOE-190690-CS-CDS / Least Cost IDA / D5030 learning environment at the Post Open - National 0.00 Canceled 2020-09-15 2020-09-29 2020-10-06 2020-11-19 2020-12-17 2021-01-16 2021-02-20 2021-03-27 2021-09-23 External Audit Services Selection senior secondary level LR-MOE-159314-CS-QCBS / Improving access and Quality And Cost- Under Hiring of TA for construction IDA / D5030 learning environment at the Prior Open - International 0.00 2020-12-08 2021-03-24 2020-12-29 2021-03-29 2021-02-11 2021-03-11 2021-04-10 2021-05-15 2021-06-19 2022-06-19 Based Selection Implementation supervision senior secondary level LR-MOE-208225-CS-CQS / Procurement of ICT Services Improving quality and Consultant Under to develop Textbooks IDA / D5030 relevance of senior secondary Post Qualification Open - International 0.00 2020-12-11 2021-05-14 2021-01-01 2021-02-14 2021-03-16 2021-04-20 2021-10-17 Implementation application and digital education Selection platform LR-MOE-190733-CS-CQS / Consulting Services for Improving access and Consultant Under integrating digital technology IDA / D5030 learning environment at the Post Qualification Open - National 0.00 2020-09-30 2021-03-17 2020-10-21 2021-03-23 2020-12-04 2021-05-13 2021-01-03 2021-02-07 2021-08-06 Implementation to teaching and learning at senior secondary level Selection the University of Liberia LR-MOE-208224-CS-CQS / Consulting services to conduct a feasibility study of capacity-building needs of Capacity building, technical Consultant MoE and education assistance, project Under IDA / D5030 Post Qualification Open - International 0.00 2020-12-15 2021-01-03 2021-01-05 2021-01-25 2021-02-18 2021-04-05 2021-03-20 2021-04-24 2021-10-21 institutions involved in the coordination, and monitoring Implementation Selection project implementation and and evaluation developing corresponding programs to address the identified capacity gap. LR-MOE-173188-CS-CQS / Increasing opportunities for Technical Assistance for Consultant girls to transition to and Promoting Community IDA / D5030 Post Qualification Open - National 0.00 Canceled 2020-05-15 2020-06-27 2020-06-05 2020-07-21 2020-07-19 2020-08-18 2020-09-22 2021-03-21 complete senior secondary Engagement to Empower Selection education Girls, School & Community LR-MOE-138248-CS-QCBS / Consulting services to support identification and adaptation Improving quality and Quality And Cost- of textbooks for five subject IDA / D5030 relevance of senior secondary Prior Open - International 0.00 Canceled 2020-12-11 2021-01-01 2021-02-14 2021-03-14 2021-04-13 2021-05-18 2021-06-22 2022-06-22 Based Selection areas Math, English, Physics, education Chemistry and Biology) for grades 10, 11 and 12. LR-MOE-138246-CS-CQS / Consulting services to review and revise MoE’s existing Improving quality and Consultant textbook guidelines and build IDA / D5030 relevance of senior secondary Post Qualification Open - National 0.00 Canceled 2020-11-30 2021-05-08 2020-12-21 2021-02-03 2020-12-16 2021-03-05 2021-04-09 2022-04-09 capacity at the Center for education Selection Curriculum and Textbook Research Page 2 LR-MOE-236513-CS-CQS / Consulting Services to Review Improving quality and Consultant Under and Revise Ministry of IDA / D5030 relevance of senior secondary Post Qualification Open - International 0.00 2021-05-30 2021-06-10 2021-06-20 2021-06-15 2021-08-03 2021-09-02 2021-10-07 2022-04-05 Implementation Education’s Existing Textbook education Selection Management Guidelines INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Capacity building, technical LR-MOE-138791-CS-INDV / Individual assistance, project Hire International IDA / D5030 Prior Consultant Open 147,360.00 Signed 2019-12-10 2019-12-17 2020-01-28 2020-03-27 2020-02-18 2020-04-14 2020-03-24 2020-05-01 2021-03-24 coordination, and monitoring Procurement Specialist Selection and evaluation Capacity building, technical LR-MOE-138778-CS-INDV / Individual assistance, project Hire Deputy Project IDA / D5030 Post Consultant Open 85,920.00 Signed 2020-02-10 2020-02-10 2020-03-30 2020-05-27 2020-04-20 2020-06-01 2020-05-25 2020-06-21 2021-05-25 coordination, and monitoring Coordinator Selection and evaluation Capacity building, technical Individual LR-MOE-138789-CS-INDV / assistance, project IDA / D5030 Post Consultant Open 13,800.00 Signed 2020-02-10 2020-02-12 2020-03-30 2020-09-28 2020-04-20 2020-11-08 2020-05-25 2020-12-18 2020-11-21 Hire Administrative Assistant coordination, and monitoring Selection and evaluation Increasing opportunities for LR-MOE-138767-CS-INDV / Individual girls to transition to and Consulting services to support IDA / D5030 Post Consultant Open 42,515.00 Signed 2020-08-20 2020-06-27 2020-10-08 2020-11-20 2020-10-29 2021-01-27 2020-12-03 2021-02-17 2021-06-01 complete senior secondary girls’ Scholarship Program Selection education LR-MOE-181599-CS-INDV / Technical Assistant for Improving quality and Individual supporting Safer Learning IDA / D5030 relevance of senior secondary Post Consultant Open 32,738.75 Signed 2020-07-15 2020-06-27 2020-09-02 2020-12-30 2020-09-23 2021-01-27 2020-10-28 2021-02-17 2021-04-26 Environment-Female guidance education Selection & Counselling program Capacity building, technical Individual LR-MOE-202576-CS-INDV / assistance, project IDA / D5030 Post Consultant Limited 53,760.00 Signed 2020-12-15 2020-12-20 2020-12-20 2021-02-28 2021-01-10 2021-03-17 2021-02-14 2021-03-31 2023-12-27 Recruitment of M&E Specialist coordination, and monitoring Selection and evaluation LR-MOE-198064-CS-CDS / Capacity building, technical Procurement Services for assistance, project IDA / D5030 Prior Direct Selection Direct 142,684.20 Signed 2020-11-27 2021-02-18 2020-12-07 2021-03-03 2021-02-10 2021-05-10 2021-08-09 Independent Verification coordination, and monitoring Agency(IVA) and evaluation LR-MOE-179028-CS-INDV / Capacity building, technical Individual Consultancy Services for assistance, project IDA / D5030 Post Consultant Open 97,920.00 Signed 2020-12-11 2021-01-27 2021-01-29 2021-05-11 2021-02-19 2021-05-20 2021-03-26 2021-06-08 2021-09-22 Environmental & Social coordination, and monitoring Selection Safeguards Specialist and evaluation LR-MOE-138251-CS-INDV / Improving access and Individual Under Hiring of a National Contract IDA / D5030 learning environment at the Post Consultant Open 0.00 2021-04-27 2021-06-08 2021-06-15 2021-07-06 2021-08-10 2022-02-06 Implementation Management Specialist senior secondary level Selection LR-MOE-225961-CS-CDS / Capacity building, technical External Financial Audit of the assistance, project Under IRISE Project for the period IDA / D5030 Prior Direct Selection Direct 0.00 2021-04-12 2021-05-18 2021-04-22 2021-06-09 2021-06-26 2021-12-23 coordination, and monitoring Implementation July 1, 2020 - November 30, and evaluation 2023 LR-MOE-234067-CS-INDV / Increasing opportunities for Technical Assistance for Individual girls to transition to and Under Promoting Community IDA / D5030 Post Consultant Open 0.00 2021-05-21 2021-06-15 2021-07-09 2021-07-30 2021-09-03 2022-03-02 complete senior secondary Implementation Engagement to Empower Selection education Girls, Schools and Communities. Capacity building, technical LR-MOE-234613-CS-INDV / Individual assistance, project Under Hire Project Controls IDA / D5030 Post Consultant Open 0.00 2021-05-20 2021-06-05 2021-07-08 2021-07-29 2021-09-02 2022-03-01 coordination, and monitoring Implementation Specialist. Selection and evaluation LR-MOE-234626-CS-INDV / Capacity building, technical Hire Technical Support Individual assistance, project Pending Specialist to assist fast track IDA / D5030 Post Consultant Open 0.00 2021-05-21 2021-07-09 2021-07-30 2021-09-03 2022-03-02 coordination, and monitoring Implementation implementation of Sub- Selection and evaluation component 3.1B Capacity building, technical LR-MOE-205342-CS-CDS / assistance, project IDA / D5030 Prior Direct Selection Direct 0.00 Canceled 2020-11-27 2021-01-05 2020-12-07 2021-01-06 2021-02-10 2021-08-09 External Audit Services coordination, and monitoring and evaluation LR-MOE-234630-CS-CDS / Consulting services to support identification and adaptation Improving quality and Under of textbooks for five subject IDA / D5030 relevance of senior secondary Post Direct Selection Direct 0.00 2021-06-09 2021-06-11 2021-06-19 2021-08-23 2022-02-19 Implementation areas Math, English, Physics, education Chemistry and Biology) for grades 10, 11 and 12. Page 3 LIBERIA AGENCY for COMMUNITY EMPOWERMENT Abbreviated Procurement Plan Attachment I – Procurement Plan I. General 1. Project Information: Country: Liberia Project Name: Youth Opportunities Project Project ID No.: P146827 Credit Number: 5621 - LR Executing Agencies: Liberia Agency for Community Empowerment 2. Bank’s approval Date of the procurement Plan: June March16 11, 20157 3. Date of General Procurement Notice: December 20, 2016 4. Period covered by this procurement plan: March 12, 2015 to August 10, 2016June 2017 to May 31, 2018 II. Goods, Supply & Installation of Plant & Equipment, Works & non- Consulting Services. 5. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: World Bank’s Guidelines: Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits & Grants (January 2011 edition) and revised in July 2014, and is open to all eligible bidders as defined in the guidelines. Consulting services will be selected in accordance with the World Bank’s Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers (January 2011 edition) and revised July, 2014 and Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants, dated October 15, 2006, and revised in January 2011. Table 1: Thresholds for Procurement Methods and Prior Review – Goods and Works and Non Consultant Services Expenditure Procurement Contract Value Threshold Contracts Subject to Category Method For use of Method (US$) Prior Review (US$) 1. Works ICB(Works/Supply & >=5,000,000 All contracts Installation) NCB >=200,000 - <5,000,000 As in procurement plan Shopping <200,000 None Direct Contracting All values All contracts 2. Goods and ICB >=500,000 All contracts Non NCB >=100,000 <500,000 As in procurement plan Consultant Shopping <500,000 (motor vehicles None Services only) Shopping <100,000 000 (rest not None motor vehicles) Direct Contracting All values All contracts Procurement from All values None UNOPS Agency 6. Prequalification. Not expected for the works/goods packages. 7. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: N/A 8. Reference to (if any) Project Operational/Procurement Manual: Yes 9. Any Other Special Procurement Arrangements: None 10. Procurement Packages with Methods and Time Schedule a) Works b) Procurement of Goods and Non Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estim Procure Prequa Nation Revie Expecte Expect Comme No. (Description) ated ment lificatio al w d bid ed nts Cost Method n Prefer by opening Contra US$ (yes/no ence Bank date ct millio ) (yes/n (Prior Signat n o) / ure Post) Date Goods 1. Procurement of 88,000 Shopping No No Post 12/01/17 12/21/1 .00 7 off road Vehicles (Station wagons) 2 No. 2. Agro Inputs 187,82 Shopping No No Post 11/09/17 11/14/1 4.00 7 (Tools & Planting Materials) (To be procured per county) 3. Motorbikes(14) 53,200 Shopping No No Post 07/24/17 08/15/1 .00 7 for County Coordinators movements in the fifteen counties 4. Supply of 25.200 Shopping No No Post 07/03/17 07/14/1 .00 7 computers (21 laptops and 1 desk top), duplex printer (1) 5. Supply of (6) Air 3,000. Shopping No No Post 07/03/01 07/14/1 00 7 7 conditioners - (2) 12000 btus and (6) 9000 btus; 1 refrigerator and 1 water dispenser. 6. Supply of 6,600. Shopping No No Post 07/03/17 07/14/1 00 7 assorted stationery supplies including cartridges 7. Supply of office 8,500. Shopping No No Post 07/03/17 07/14/1 00 7 furniture (6 wooden desks- 1 executive and 5 L-shape desks; 27 chairs - 6 executive chairs, 10 conference table chairs, and 10 visitors chairs; ) (15 sets window blinders), two doors and (7) cabinets - 1 transparent and 6 ordinary) 8. Supply of office 2,100. Shopping No No Post 07/03/17 07/14/1 00 7 consumables - tea, milk, tissues, sugar, deltol, detergents, air freshner, hand sensitizer, etc. Total 374,4 24 III. Selection of Consultants 11. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Table 2: Thresholds for Consultants Selection Methods and Prior Review Contract Value Threshold Expenditure Contracts Subject to Selection Method For use of Selection Category Prior Review (US$) Method (US$) Firms QCBS,QBS >=200,000 All contracts CQS,LCS,QBS,FBS <200,000 As in procurement plan SSS All values All Contracts Individual Competitive All Contracts >=100,000 Consultants Selection (IC) IC Single Source All Contracts All Values Selection 12. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 13. Consultancy services estimated to cost above US$200,000 equivalent per contract and individual consultants assignments estimated to cost US$100,000 and above and all individual consultants hired on single source basis will be subject to prior review by the Bank. 14. The threshold for the use of Selection of Consultant firms based on Consultants’ Qualifications (CQS) is determined on a case by case basis taking into account the nature and complexity of the assignment but shall not exceed US$300,000 other than in exceptional situations and in accordance with paragraph 3.7 the Guidelines: Selection and Employment of Consultants. 15. Irrespective of the thresholds and category of risk, the Terms of Reference (TOR) for selection of consultants (firms of individuals), whether prior or post review shall be cleared by the Bank. c) Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 7 Ref. Description of Estimated Method Revie Expected Expected No. Assignment Cost of w date of Contract Comments US$ Selectio by proposal Signature n Bank submissi Date (Prior on / Post) 1. Production of TOT 6,000.00 ICS Post 09/01/17 09/06/17 Life Skills Training materials 2. Procurement of a 63,000.00 ICS Post N/A 01/02/17 Project Technical Team Manager 3. Procurement of a 45,000.00 ICS Post N/A Productive Public Works Officer 4. Procurement of a 36,000.00 ICS Post N/A 01/02/17 Financial Management Officer 5. Procurement of a 27,000.00 ICS Post N/A 01/02/17 Monitoring & Evaluation and Safeguard Officer 6. Procurement of a 32,400.00 ICS Post N/A 01/02/17 Procurement Officer 7. Procurement of an 32,400.00 ICS Post N/A 01/02/17 Internal Auditor 8. Procurement of an 18,000.00 ICS Post N/A 01/02/17 MIS/ Project Assistant 9. Procurement of a 12,600.00 ICS Post N/A 08/10/17 Montserrado County Coordinator 10. Procurement of a 12,600.00 ICS Post N/A 08/10/17 Bomi County Coordinator 11. Procurement of a 12,600.00 ICS Post N/A 08/10/17 Grand Cape Mount County Coordinator 12. Procurement of a 12,600.00 ICS 08/10/17 Grand Bassa County Coordinator 13. Procurement of a 12,600.00 ICS Post N/A 08/10/17 River Cess County Coordinator 14. Procurement of a 12,600.00 ICS Post N/A 08/10/17 Margibi County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Gbarpolu County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Bong County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Lofa County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Nimba County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 River Gee County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Grand Gedeh County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Sinoe County Coordinator Procurement of a 12,600.00 ICS post N/A 08/10/17 Maryland County Coordinator Procurement of a 12,600.00 ICS Post N/A 08/10/17 Grand Kru County Coordinator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Bomi Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Grand Cape Mount Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Grand Bassa Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Margibi Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Gbarpolu Community Facilitator Procurement of a 20,000.00 CQS post 02/03/17 02/27/17 Bong Community Facilitator Procurement of a 20,000.00 CQS Post 02/27/17 Lofa Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Nimba Community Facilitator Procurement of a 20,000.00 CQS post 02/03/17 02/27/17 River Gee Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Grand Gedeh Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 02/27/17 Grand Kru Community Facilitator Procurement of a 20,000.00 CQS Post 02/27/17 Sinoe Community Facilitator Procurement of a 20,000.00 CQS Post 02/03/17 Rivercee Community Facilitator Consulting 240,000.00 QCBS Post 03/06/17 04/27/17 Services for Apprenticeship training for Household Enterprise beneficiaries Service Providers 287,899.00 QCBS Post 12/27/16 01/23/17 to supervise Household Enterprise beneficiaries Data Management 100,000.00 QCBS Post N/A 12/21/17 Firm (Consultancy Firm) TOTAL d) Training and Workshop Ref. Training, workshop and study Estimated Estimated Expected Training/workshop No. tours Cost (US$) Duration (Days) Date 1. 2. GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan. A detailed training and workshops’ plan giving nature of training/workshop, number of trainees/participants, duration, staff months, timing and estimated cost will be submitted to the Bank for review and approval prior to initiating the process. The selection methods will derive from the activity requirement, schedule and circumstance. After the training, the beneficiaries will be requested to submit a brief report indicating what skill have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operating costs: Incremental recurrent expenditures during project implementation, including maintenance of vehicles, fuel, equipment, office supplies, utilities, consumables, banking charges, advertising expenses, internet service, car insurance, travel, per diems, and accommodations, but excluding salaries of civil and public servants, will be procured using the implementing agency's administrative procedures reviewed and found acceptable by the Bank. PROCUREMENT Liberia : Liberia Youth Opportunities Project PLAN General Information Country: Liberia Bank’s Approval Date of the Original Procurement Plan: 2018-05-28 2021-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146827 GPN Date: Project Name: Liberia Youth Opportunities Project Loan / Credit No: IDA / 56210 Ministry of Youth and Sport Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-MOYS-62740-CW-RFQ / Project Implementation and Request for Single Stage - One 2019-01- IDA / 56210 Post Limited 21,000.00 0.00 Canceled 2018-06-13 2018-07-18 Office Renovation Coordination Quotations Envelope 14 Request for LR-MOYS-232451-CW-RFQ / Project Implementation and Request for Single Stage - One 2021-08- IDA / 56210 Post Limited Quotations (Non 67,950.00 69,141.16 Signed 2021-05-22 2021-05-13 2021-07-17 2021-05-27 Office Renovation Coordination Quotations Envelope 16 Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-62659-GO-RFQ / Procurement of Cross County Project Implementation and Request for Single Stage - One IDA / 56210 Post Limited 88,000.00 0.00 Canceled 2018-06-12 2018-06-29 2018-07-20 Vehicles for operations (2 Coordination Quotations Envelope Nos) LR-MOYS-62670-GO-RFQ / Project Implementation and Request for Single Stage - One Supply of additional laptop (2 IDA / 56210 Post Limited 2,700.00 0.00 Canceled 2018-06-11 2018-08-06 2019-02-02 Coordination Quotations Envelope No); Desktop (new) LR-MOYS-62747-GO-RFQ / Supply of additional air Project Implementation and Request for Single Stage - One IDA / 56210 Post Limited 2,100.00 0.00 Canceled 2018-05-23 2018-07-18 2019-01-14 condition (3) & Refregerators Coordination Quotations Envelope (2) LR-MOYS-62738-GO-RFQ / Project Implementation and Request for Single Stage - One IDA / 56210 Post Limited 10,200.00 0.00 Canceled 2018-06-11 2018-06-29 2018-12-26 Supply of office furnitures Coordination Quotations Envelope LR-MOYS-62704-GO-RFQ / Supply of laptop computers (6 Project Implementation and Request for Single Stage - One Nos); Desktop (1); Duplex IDA / 56210 Post Limited 10,800.00 0.00 Canceled 2018-06-11 2018-07-12 2019-01-08 Coordination Quotations Envelope printer (1); Portable printer (3 No) and Project (1) LR-MOYS-128979-GO-RFQ / Pre-Employment Social Procurement of Pre- Request for Single Stage - One IDA / 56210 Support and Household Post Limited 4,000.00 2,997.00 Completed 2019-10-05 2019-10-18 2019-11-30 2019-10-25 2020-05-28 2019-10-28 Employment Social Support Quotations Envelope Enterprises for Urban Youth Training Materials LR-MOYS-128980-GO-DIR / Pre-Employment Social Access to digital payment IDA / 56210 Support and Household Prior Direct Selection Direct 150,000.00 102,000.00 Signed 2019-09-30 2019-09-17 2019-10-05 2019-10-03 2019-11-09 2019-10-14 2020-05-07 (mobile phones for Enterprises for Urban Youth beneficiaries) LR-MOYS-81962-GO-RFQ / Project Implementation and Request for Single Stage - One Procurement of Portoble IDA / 56210 Post Limited 900.00 0.00 Canceled 2018-11-17 2019-01-30 2019-01-12 2019-07-11 Coordination Quotations Envelope Printersfor office use ( 3 PCS) LR-MOYS-221066-GO-RFQ / Project Implementation and Request for Single Stage - One IDA / 56210 Post Limited 3,750.00 0.00 Canceled 2021-03-04 2021-04-29 2021-05-29 Signboards Coordination Quotations Envelope LR-MOYS-235912-GO-RFQ / Pre-Employment Social Pending Request for Single Stage - One Business Enhancement IDA / 56210 Support and Household Post Limited 31,000.00 0.00 Implementati 2021-06-04 2021-07-30 2021-07-30 Quotations Envelope Support Enterprises for Urban Youth on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-128978-NC-RFQ / Pre-Employment Social Request for Single Stage - One Production of Video IDA / 56210 Support and Household Post Limited 4,000.00 0.00 Canceled 2019-09-30 2019-11-25 2020-05-23 Quotations Envelope Documentary Enterprises for Urban Youth LR-MOYS-195976-NC-RFQ / Project Implementation and Request for Single Stage - One Equipment Rental for YOP IDA / 56210 Post Limited 2,950.00 2,949.93 Completed 2020-10-04 2020-09-30 2020-11-09 2020-10-12 2021-06-30 2020-11-07 Coordination Quotations Envelope Information Sharing LR-MOYS-235909-NC-RFQ / Pending Project Implementation and Request for Single Stage - One Production of Video IDA / 56210 Post Limited 9,000.00 0.00 Implementati 2021-06-04 2021-07-31 2021-08-01 Coordination Quotations Envelope Documentary on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-62749-CS-QCBS / Pre-Employment Social Consultant Recruitment of IDA / 56210 Support and Household Post Qualification Open - International 135,936.00 0.00 Canceled 2018-06-05 2018-07-03 2018-07-24 2018-08-06 2018-09-10 2019-03-09 firm/Consultant for PESS Enterprises for Urban Youth Selection Page 1 LR-MOYS-80411-CS-CQS / Pre-Employment Social Consultant Pre-Employment & Social IDA / 56210 Support and Household Post Qualification Open - International 125,000.00 124,993.60 Completed 2018-10-19 2018-10-11 2018-11-09 2018-10-11 2018-12-23 2018-12-17 2019-01-22 2019-01-31 2019-02-26 2019-02-14 2019-08-25 2020-02-29 Support Implementation Enterprises for Urban Youth Selection LR-MOYS-62752-CS-LCS / Recruitment of Project Implementation and Least Cost IDA / 56210 Post Open - National 8,000.00 0.00 Canceled 2018-06-08 2016-08-22 2018-06-29 2018-08-12 2018-09-09 2018-10-09 2018-11-13 2018-12-18 2019-06-16 Firm/Consultant for External Coordination Selection Auditor LR-MOYS-81961-CS-CQS / Consultant Recruitment of Project Implementation and IDA / 56210 Post Qualification Open - National 8,000.00 8,000.00 Signed 2016-08-15 2018-11-02 2016-09-05 2016-10-19 2018-09-20 2016-11-18 2018-01-10 2016-12-23 2018-01-10 2017-06-21 Firm/Consultant for External Coordination Selection Auditor LR-MOYS-134874-CS-CQS / Consultant Project Implementation and Annual Beneficiary Satisfaction IDA / 56210 Post Qualification Open - National 86,000.00 72,000.20 Signed 2019-09-30 2019-09-16 2019-10-21 2019-09-25 2019-12-04 2019-11-22 2020-01-03 2020-01-03 2020-02-07 2020-01-10 2020-04-30 Coordination Survey Selection LR-MOYS-128977-CS-LCS / Capacity Building for Cash Least Cost IDA / 56210 Post Open - National 15,000.00 0.00 Canceled 2019-09-30 2019-10-21 2019-12-04 2020-01-01 2020-01-31 2020-03-06 2020-04-10 2020-10-07 External Audit Transfer Program Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOYS-62728-CS-INDV / Individual Project Implementation and Recruitment of International IDA / 56210 Post Consultant Open 96,000.00 0.00 Canceled 2018-06-07 2016-11-28 2018-07-19 2018-08-09 2018-09-13 2019-03-12 Coordination Procurement Specialist Selection LR-MOYS-62703-CS-INDV / Pre-Employment Social Individual Recruitment Grivence Redress IDA / 56210 Support and Household Post Consultant Limited 27,000.00 0.00 Canceled 2018-06-05 2016-11-01 2018-06-10 2018-07-24 2018-08-28 2019-02-24 Officer Enterprises for Urban Youth Selection LR-MOYS-62665-CS-INDV / Individual Project Implementation and Recruitment of Program IDA / 56210 Post Consultant Limited 18,000.00 0.00 Canceled 2018-06-04 2016-11-01 2018-06-09 2018-06-22 2018-07-27 2019-01-23 Coordination Assistant Selection LR-MOYS-65232-CS-INDV / Individual Project Implementation and Recruitment of Senior IDA / 56210 Post Consultant Open 72,000.00 0.00 Canceled 2018-06-12 2016-09-04 2018-07-31 2018-08-21 2018-09-25 2019-03-24 Coordination Program Officer Selection LR-MOYS-62862-CS-CQS / Individual Project Implementation and Recruitment of Project IDA / 56210 Post Consultant Open 81,800.00 0.00 Canceled 2018-06-12 2016-09-04 2018-07-31 2018-08-21 2018-09-25 2019-03-24 Coordination Coordinator Selection LR-MOYS-62708-CS-INDV / Pre-Employment Social Individual Recruitment of IDA / 56210 Support and Household Post Consultant Limited 36,000.00 0.00 Canceled 2018-06-07 2016-12-01 2018-06-12 2018-06-04 2018-07-03 2018-08-07 2019-02-03 Communication Officer Enterprises for Urban Youth Selection Pre-Employment Social Individual LR-MOYS-62743-CS-INDV / IDA / 56210 Support and Household Post Consultant Limited 27,000.00 0.00 Canceled 2018-06-06 2018-06-11 2018-07-02 2018-08-06 2019-02-02 Recruitment of M & E Officer Enterprises for Urban Youth Selection LR-MOYS-62726-CS-INDV / Individual Project Implementation and Recruitment of Account IDA / 56210 Post Consultant Limited 36,000.00 0.00 Canceled 2018-06-06 2018-06-11 2018-07-02 2018-08-06 2019-02-02 Coordination Management (PFMU) Selection LR-MOYS-81957-CS-CDS / Recruitment of a firm for Project Implementation and IDA / 56210 Post Direct Selection Direct 19,200.00 19,200.00 Completed 2018-07-20 2018-10-17 2018-07-30 2018-10-03 2019-03-01 2019-04-01 2019-03-01 external audit for fiscal year Coordination 2017/2018 LR-MOYS-81954-CS-INDV / Individual Recruitment for Project Implementation and IDA / 56210 Post Consultant Open 24,000.00 24,000.00 Completed 2018-05-15 2018-08-06 2018-07-03 2018-08-31 2018-07-24 2018-09-17 2018-08-28 2018-09-21 2019-02-24 2019-09-30 Communiications Officer FY Coordination Selection 20182019 LR-MOYS-81958-CS-CDS / Project Implementation and Recruitment of Project IDA / 56210 Post Direct Selection Direct 54,120.00 4,000.00 Signed 2016-10-07 2016-08-01 2016-10-17 2016-12-21 2016-09-15 2017-06-19 Coordination Coordinator LR-MOYS-81945-CS-CDS / Project Implementation and Recruitment of Senior IDA / 56210 Post Direct Selection Direct 48,000.00 150,000.00 Signed 2016-10-07 2016-08-01 2016-10-17 2016-11-15 2016-12-21 2016-09-26 2017-06-19 Coordination Program Officer Individual LR-MOYS-81952-CS-INDV / Project Implementation and IDA / 56210 Post Consultant Open 18,000.00 36,000.00 Signed 2016-10-07 2018-11-02 2016-11-25 2017-02-16 2016-12-16 2017-03-06 2017-01-20 2017-03-27 2017-07-19 Recruitment of M & E Officer Coordination Selection LR-MOYS-81947-CS-INDV / Individual Recruitment of Project Implementation and IDA / 56210 Post Consultant Open 24,000.00 19,200.00 Signed 2016-10-07 2016-12-15 2016-11-25 2017-01-26 2016-12-16 2017-03-20 2017-01-20 2017-03-27 2017-07-19 Communication Officer FY Coordination Selection 20172018 LR-MOYS-81955-CS-INDV / Individual Project Implementation and Recruitment of Program IDA / 56210 Post Consultant Open 12,000.00 24,000.00 Signed 2016-10-07 2016-12-16 2016-11-25 2017-03-06 2016-12-16 2017-03-20 2017-01-20 2017-03-24 2017-07-19 Coordination Assistant Selection LR-MOYS-81964-CS-INDV / Individual Project Implementation and Recruitment Grivence Redress IDA / 56210 Post Consultant Open 18,000.00 18,000.00 Signed 2016-11-14 2016-12-15 2017-01-02 2017-03-06 2017-01-23 2017-03-20 2017-02-27 2017-03-24 2017-08-26 Coordination Officer Selection LR-MOYS-81948-CS-CDS / Project Implementation and Recruitment of Account IDA / 56210 Post Direct Selection Direct 24,000.00 24,000.00 Signed 2016-11-10 2017-01-17 2016-11-20 2018-01-29 2017-01-24 2018-01-01 2017-07-23 Coordination Management (PFMU) LR-MOYS-81950-CS-INDV / Individual Project Implementation and Under Recruitment of International IDA / 56210 Prior Consultant Open 96,000.00 0.00 2016-11-10 2021-04-21 2016-12-29 2017-03-06 2017-01-19 2017-02-23 2017-08-22 Coordination Implementation Procurement Specialist Selection LR-MOYS-94777-CS-INDV / Individual Project Implementation and Procurement of a Senior IDA / 56210 Prior Consultant Limited 24,000.00 0.00 Canceled 2019-02-20 2019-03-11 2019-02-25 2019-03-18 2019-04-22 2020-04-16 Coordination Procurement Officer Selection Page 2 LR-MOYS-106128-CS-INDV Individual Project Implementation and / Hiring of a Procurement IDA / 56210 Prior Consultant Limited 24,000.00 0.00 Canceled 2019-03-20 2019-03-19 2019-03-25 2019-03-20 2019-04-15 2019-05-20 2020-05-14 Coordination Specialist Selection LR-MOYS-108034-CS-INDV Individual Project Implementation and / Hiring of a Procurement IDA / 56210 Prior Consultant Limited 24,000.00 24,000.00 Signed 2019-03-19 2019-03-28 2019-03-24 2019-04-03 2019-04-14 2019-06-26 2019-05-19 2019-07-01 2020-05-13 Coordination Specialist Selection Individual LR-MOYS-114073-CS-INDV Project Implementation and IDA / 56210 Post Consultant Open 5,000.00 5,000.00 Completed 2019-05-15 2019-05-13 2019-07-03 2019-08-12 2019-07-24 2019-08-14 2019-08-21 2019-09-02 2020-02-17 2020-09-02 / YOP Website Development. Coordination Selection LR-MOYS-134380-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 12,500.00 0.00 Canceled 2019-09-18 2019-09-28 2019-12-02 2020-05-30 MIS Consultant Coordination LR-MOYS-134873-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 12,500.00 12,000.00 Signed 2019-09-19 2019-08-23 2019-09-29 2019-10-07 2019-12-03 2019-10-09 2020-05-31 MIS Consultant Coordination LR-MOYS-136594-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 33,048.00 33,048.00 Completed 2019-09-30 2019-10-03 2019-10-10 2019-09-27 2019-12-14 2019-10-07 2020-06-11 2020-06-30 Senior Program Officer Coordination LR-MOYS-136590-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 37,261.62 86,943.78 Signed 2019-10-04 2019-10-03 2019-10-14 2019-09-27 2019-12-18 2019-10-07 2020-06-15 National Program Coordinator Coordination LR-MOYS-136591-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 10,800.00 10,800.00 Completed 2019-09-30 2019-10-03 2019-10-10 2019-09-27 2019-12-14 2019-10-07 2020-06-11 2020-03-31 Communications Officer Coordination LR-MOYS-186219-CS-CDS / Pre-Employment Social Pre-employment Social IDA / 56210 Support and Household Post Direct Selection Direct 108,400.00 104,706.00 Signed 2020-08-29 2020-08-06 2020-09-08 2020-08-11 2020-11-12 2020-09-01 2021-05-11 Support Round Two Enterprises for Urban Youth Individual LR-MOYS-191398-CS-INDV Project Implementation and IDA / 56210 Post Consultant Limited 10,000.00 9,000.00 Signed 2020-09-30 2020-09-02 2020-10-05 2020-09-06 2020-10-26 2020-09-12 2020-11-30 2020-09-14 2021-06-30 / Program Support Officer Coordination Selection LR-MOYS-191403-CS-INDV Individual Project Implementation and / Administrative/GRM IDA / 56210 Post Consultant Limited 5,000.00 4,500.00 Signed 2020-09-30 2020-09-02 2020-10-05 2020-09-04 2020-10-26 2020-09-12 2020-11-30 2020-09-14 2021-06-30 Coordination Assistant Selection LR-MOYS-214934-CS-INDV Individual Project Implementation and / Environmental Social IDA / 56210 Post Consultant Limited 5,000.00 5,000.00 Completed 2021-02-05 2021-01-19 2021-02-10 2021-01-24 2021-03-03 2021-01-29 2021-04-07 2021-01-30 2021-04-30 2021-02-25 Coordination Consultant Selection LR-MOYS-220491-CS-INDV Individual Project Implementation and / Implementation Completion IDA / 56210 Post Consultant Open 40,000.00 35,000.00 Signed 2021-03-29 2021-02-24 2021-05-17 2021-04-11 2021-06-07 2021-04-29 2021-07-12 2021-05-01 2021-09-30 Coordination Report (ICR) Selection LR-MOYS-220490-CS-INDV Individual / Development of Project Project Implementation and IDA / 56210 Post Consultant Limited 10,000.00 8,000.00 Signed 2021-03-29 2021-02-24 2021-04-03 2021-03-02 2021-04-24 2021-03-29 2021-05-29 2021-04-01 2021-08-27 Operations Manual and Coordination Selection handbooks LR-MOYS-234760-CS-CDS / Project Implementation and IDA / 56210 Post Direct Selection Direct 2,000.00 1,000.00 Signed 2021-05-17 2021-05-23 2021-05-27 2021-05-23 2021-07-31 2021-05-25 2021-08-01 MIS/Program Assistant Coordination Page 3 PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Benin : Gazetted Forests Management Project PLAN General Information Country: Benin Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167678 GPN Date: 2019-10-15 Project Name: Gazetted Forests Management Project Loan / Credit No: IDA / D4770 G Executing Agency(ies): ENERAL DIRECTORATE FOR ENVIRONMENT AND CLIMATE WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BJ-WACA -142583-CW-RFB / Pending Integrated Management of Single Stage - One 2021-06- Travaux de conception et IDA / D4770 Post Request for Bids Open - National 400,000.00 0.00 Implementat 2020-08-24 2020-08-29 2020-10-10 2020-11-09 2020-12-14 Gazetted Forests Envelope 12 d'ouverture des pistes d'accès. ion BJ-WACA -142587-CW-RFQ Pending / Travaux de préparation de Integrated Management of Request for Single Stage - One 2021-04- IDA / D4770 Post Limited 150,000.00 0.00 Implementat 2020-08-22 2020-10-17 sol (Défrichement, Gazetted Forests Quotations Envelope 15 ion dégagement et dessouchage). BJ-WACA -142590-CW-CDD / Production du plant/pépiniériste au niveau Pending Integrated Management of Community Driven 2021-04- des six (06) forêts classées : IDA / D4770 Post Limited 180,000.00 0.00 Implementat 2020-06-23 2020-06-28 2020-08-09 2020-09-08 2020-10-13 Gazetted Forests Development 11 Kétou, Dan, Logozohè, Ouémé- ion Boukou, Agoua, Tchaourou- Toui-Kilibo. BJ-WACA -142603-CW-CDD Pending / Travaux de production du Integrated Management of Community Driven 2021-01- IDA / D4770 Post Limited 465,000.00 0.00 Implementat 2020-03-23 2020-03-28 2020-05-09 2020-06-08 2020-07-13 plant de la forêt de Dogo par Gazetted Forests Development 09 ion les pépiniéristes locaux. BJ-WACA -142604-CW-CDD / Travaux de production du Pending Integrated Management of Community Driven 2021-01- plant des six (06) Forêts IDA / D4770 Post Limited 150,000.00 0.00 Implementat 2020-03-23 2020-03-28 2020-05-09 2020-06-08 2020-07-13 Gazetted Forests Development 09 Classées par les pépiniéristes ion locaux. BJ-WACA -142605-CW-CDD / Travaux de réalisation de Pending 600 ha de plantation de bois Integrated Management of Community Driven 2021-09- IDA / D4770 Post Limited 570,200.00 0.00 Implementat 2020-11-23 2020-11-28 2021-01-09 2021-02-08 2021-03-15 énergie par les structure de Gazetted Forests Development 11 ion cogestion à raison de 100 ha par forêt classée. BJ-WACA -142606-CW-CDD / Élaborer et signer une convention avec l'ONAB pour Pending Integrated Management of Community Driven 2021-04- réaliser 750 ha de plantation IDA / D4770 Post Limited 296,813.00 0.00 Implementat 2020-06-22 2020-06-27 2020-08-08 2020-09-07 2020-10-12 Gazetted Forests Development 10 de bois d'oeuvre dans la forêt ion classées de Dogo et l'entretien des plantations. BJ-WACA -142891-CW-RFQ / Travaux de construction de Pending Integrated Management of Request for Single Stage - One 2021-05- postes de contrôle,de IDA / D4770 Post Limited 150,000.00 0.00 Implementat 2020-10-05 2020-11-30 Gazetted Forests Quotations Envelope 29 miradors, d'installation des ion barrières (ONAB et CTAF). Pending BJ-WACA -142892-CW-RFB / Integrated Management of Single Stage - One 2021-07- IDA / D4770 Post Request for Bids Open - National 400,000.00 0.00 Implementat 2020-09-23 2020-09-28 2020-11-09 2020-12-09 2021-01-13 Travaux de forages (ONAB). Gazetted Forests Envelope 12 ion BJ-WACA -142893-CW-RFQ / Travaux de morcellement des séries agricoles, matérialisation et d'attribution Pending des parcelles d'exploitation Integrated Management of Request for Single Stage - One 2021-02- IDA / D4770 Post Limited 140,000.00 0.00 Implementat 2020-06-29 2020-08-24 agricole aux agricultures dans Gazetted Forests Quotations Envelope 20 ion les six (06) forêts classées: Kétou,Dan, Logozohè, Ouémé- boukou, Agoua, Tchaourou- Toui-Kilibo. BJ-WACA -142894-CW-RFQ / Travaux d'identification et Pending Integrated Management of Request for Single Stage - One 2021-04- de matérialisation des IDA / D4770 Post Limited 40,000.00 0.00 Implementat 2020-08-31 2020-10-26 Gazetted Forests Quotations Envelope 24 couloirs de transhumance et ion les aires de pâturage. BJ-WACA -142895-CW-RFQ / Travaux de matérialisation des limites de la série de Pending conservation des six (06) Integrated Management of Request for Single Stage - One 2021-03- IDA / D4770 Post Limited 70,000.00 0.00 Implementat 2020-08-04 2020-09-29 forêts classées : Kétou, Dan, Gazetted Forests Quotations Envelope 28 ion Logozohè, Ouémé- Boukou,Agoua, Tchaourou- Toui-Kilibo. BJ-WACA -142896-CW-RFQ Pending / Travaux de pare feux autour Integrated Management of Request for Single Stage - One 2021-04- IDA / D4770 Post Limited 36,000.00 0.00 Implementat 2020-09-01 2020-10-27 des séries de conservation des Gazetted Forests Quotations Envelope 25 ion forêts classées. Pending BJ-WACA -148865-CW-RFQ Integrated Management of Request for Single Stage - One 2021-05- IDA / D4770 Post Limited 40,000.00 0.00 Implementat 2020-10-03 2020-11-28 / Travaux de forage (ONAB). Gazetted Forests Quotations Envelope 27 ion BJ-WACA -217647-CS-CDS / Elaborer et signer des Pending conventions de production de Community Driven 2021-12- IDA / D4770 Project Management Post Direct 1,708,000.00 0.00 Implementat 2021-04-28 2021-05-03 2021-06-07 plants avec des structures de Development 04 ion cogestion au profit de l'UIGP et de l'ONAB. Page 1 BJ-WACA -217651-CS-CDS / Elaborer et signer des Pending conventions de reboisement Integrated Management of Community Driven 2022-04- IDA / D4770 Post Direct 1,906,000.00 0.00 Implementat 2021-09-22 2021-09-27 2021-11-01 avec des structures de Gazetted Forests Development 30 ion cogestion au profit de l'UIGP et de l'ONAB. BJ-WACA -217653-CS-CDS / Elaborer et signer des Pending conventions d'entretien et Integrated Management of Community Driven 2022-05- IDA / D4770 Post Direct 806,100.00 0.00 Implementat 2021-10-18 2021-10-23 2021-11-27 regamissage avec des Gazetted Forests Development 26 ion structures de cogestion au profit de l'UIGP et de l'ONAB. BJ-WACA -217661-CW-RFQ / Travaux d'ouverture et Pending Request for Single Stage - One 2022-06- d'aménagement des pistes IDA / D4770 Project Management Post Open - National 200,000.00 0.00 Implementat 2021-11-04 2021-12-30 Quotations Envelope 28 d'accès aux plantation de ion 2020 et 2021. BJ-WACA -217663-CW-RFB / Travaux de Pending Single Stage - One 2022-05- réhabilitation/construction/éq IDA / D4770 Project Management Post Request for Bids Open - National 400,000.00 0.00 Implementat 2021-07-20 2021-07-25 2021-09-05 2021-10-05 2021-11-09 Envelope 08 uipement des bases vie des ion CTAF. BJ-WACA -217664-CW-RFQ Pending / Travaux de forage au niveau Integrated Management of Request for Single Stage - One 2022-01- IDA / D4770 Post Open - National 180,000.00 0.00 Implementat 2021-05-31 2021-07-26 des sites des bases vies des Gazetted Forests Quotations Envelope 22 ion CTAF. BJ-WACA -217667-CW-RFQ Pending / Confection et pose des Integrated Management of Request for Single Stage - One 2022-07- IDA / D4770 Post Open - National 40,000.00 0.00 Implementat 2021-11-28 2022-01-23 plaques de matérialisation des Gazetted Forests Quotations Envelope 22 ion douze (12) forêts classées. BJ-WACA -217670-CW-RFQ / Travaux de construction de Pending Integrated Management of Request for Single Stage - One 2022-05- postes de contrôle et IDA / D4770 Post Open - National 60,000.00 0.00 Implementat 2021-10-03 2021-11-28 Gazetted Forests Quotations Envelope 27 d'installation des barrières au ion profit de l'ONAB. BJ-WACA -217671-CW-RFQ Pending Support to Forests Request for Single Stage - One 2021-11- / Travaux d'extension et IDA / D4770 Post Open - National 10,000.00 0.00 Implementat 2021-04-05 2021-05-31 Governance Quotations Envelope 27 d'aménagement de bureaux. ion BJ-WACA -217668-CW-RFQ / Travaux de construction et Pending Integrated Management of Request for Single Stage - One 2022-07- d'équipement des postes de IDA / D4770 Post Open - National 32,000.00 0.00 Implementat 2021-11-16 2022-01-11 Gazetted Forests Quotations Envelope 10 gardiennage dans les forêts ion classées. National BJ-WACA -232702-CW-DIR / Procurement Under Travaux d'ouverture et de Integrated Management of 2022-01- IDA / D4770 Post Direct Selection Direct Document - 1 228,000.00 0.00 Implementat 2021-06-24 2021-05-19 2021-06-29 2021-08-03 reprofilage de pistes Gazetted Forests 30 Envelope process ion forestières. (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -142491-GO-RFB / Acquisition de cent vingt-cinq Pending Integrated Management of Single Stage - One (125) motos et de sept (07) IDA / D4770 Post Request for Bids Open - International 1,331,200.00 0.00 Implementati 2020-04-20 2020-04-25 2020-06-06 2020-07-06 2020-08-10 2021-02-06 Gazetted Forests Envelope camions citerne à eau au on profit du projet. BJ-WACA -142559-GO-RFQ / contractualiser avec un opérateur GSM pour assurer la Pending communication et la Development of Selected Request for Single Stage - One IDA / D4770 Post Limited 64,600.00 0.00 Implementati 2020-05-02 2020-06-27 2020-12-24 connexion à l'internet des NTFP Value Chains Quotations Envelope on Cellules Techniques d'Aménagement Forestiers (CTAF) BJ-WACA -142576-GO-RFQ / Acquisition de petits Integrated Management of Request for Single Stage - One équipements de surveillance IDA / D4770 Post Limited 17,000.00 17,660.17 Signed 2020-03-22 2021-06-18 2020-05-17 2021-06-18 2020-11-13 Gazetted Forests Quotations Envelope (GPS, Jumelles, Boussole, Clisimètre, compas forestier). BJ-WACA -142581-GO-RFQ / Pending Acquisition d'équipement Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 80,000.00 0.00 Implementati 2020-03-29 2020-05-24 2020-11-20 informatique au profit du Governance Quotations Envelope on projet et de l'ONAB. BJ-WACA -142697-GO-RFQ / Acquisition de consommables Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 15,000.00 13,428.63 Signed 2020-01-25 2021-06-21 2020-03-21 2021-06-21 2020-09-17 informatiques au profit du Governance Quotations Envelope projet. BJ-WACA -142740-GO-RFQ / Support to Forests Request for Single Stage - One Acquisition de fourniture de IDA / D4770 Post Limited 14,000.00 12,534.18 Signed 2020-01-18 2019-11-19 2020-03-14 2021-06-17 2020-09-10 Governance Quotations Envelope bureau au profit du projet. BJ-WACA -142804-GO-RFQ / Support to Forests Request for Single Stage - One Acquisition de mobiliers de IDA / D4770 Post Limited 18,500.00 11,742.34 Signed 2020-01-18 2021-06-23 2020-03-14 2021-06-23 2020-09-10 Governance Quotations Envelope bureau au profit du projet. BJ-WACA -142818-GO-RFQ / Acquisition de motopompes et de petits outillages Integrated Management of Request for Single Stage - One IDA / D4770 Post Limited 14,000.00 17,904.17 Signed 2020-03-21 2021-06-22 2020-05-16 2021-06-22 2020-11-12 (Arrosoir, rateau, houe, seau, Gazetted Forests Quotations Envelope bassine) au profit de l'ONAB et CTAF. Page 2 BJ-WACA -142826-GO-RFQ / Acquisition des matériels et Pending Integrated Management of Request for Single Stage - One équipement de lutte contre le IDA / D4770 Post Limited 76,000.00 0.00 Implementati 2020-05-23 2020-07-18 2021-01-14 Gazetted Forests Quotations Envelope feu au profit des CTAF et on ONAB. BJ-WACA -142867-GO-RFQ / Acquisition des matériels et Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 19,000.00 17,131.79 Signed 2020-02-22 2021-06-22 2020-04-18 2021-06-22 2020-10-15 équipements de bureau au Governance Quotations Envelope profit du projet. BJ-WACA -142872-GO-RFQ / Pending Fourniture de la connexion Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 13,000.00 0.00 Implementati 2020-01-18 2020-03-14 2020-09-10 internet dans les bâtiments du Governance Quotations Envelope on projet. BJ-WACA -142483-GO-UN / Acquisition de dix-sept (17) Pending Support to Forests UN Agencies véhicules 4x4 dont quinze IDA / D4770 Post Direct 759,000.00 0.00 Implementati 2020-02-17 2020-02-22 2020-03-28 2020-09-24 Governance (Direct) (15) pick-up double cabine, on deux (02) Stations Wagon. BJ-WACA -142815-GO-DIR / Fourniture et installation de Support to Forests IDA / D4770 Post Direct Selection Direct 20,000.00 9,420.57 Signed 2020-03-27 2021-06-18 2020-04-01 2021-06-18 2020-05-06 2021-06-18 2020-11-02 logiciel comptable au profit Governance du projet. BJ-WACA -142861-NC-DIR / Acquisition des semences Pending Integrated Management of Request for Single Stage - One dans le cadre de la production IDA / D4770 Post Limited 29,900.00 0.00 Implementati 2020-04-25 2020-06-20 2020-12-17 Gazetted Forests Quotations Envelope des plants d'essence de bois on énergie. BJ-WACA -142803-GO-DIR / Pending Acquisition de semence Integrated Management of Request for Single Stage - One IDA / D4770 Post Limited 20,000.00 0.00 Implementati 2020-05-03 2020-06-28 2020-12-25 d’espèces fertilisantes et Gazetted Forests Quotations Envelope on plants d’agrosforesterie. BJ-WACA -148868-GO-RFQ / Acquisition d'équipements Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 19,600.00 17,753.77 Signed 2020-03-29 2021-06-21 2020-05-24 2021-06-21 2020-11-20 informatiques au profit du Governance Quotations Envelope projet. BJ-WACA -150068-GO-UN / Acquisition de vingt-sept (27) véhicules 4 x 4 dont quatorze Support to Forests UN Agencies IDA / D4770 Post Direct 1,170,000.00 947,496.76 Signed 2020-02-17 2021-06-18 2020-02-22 2021-06-18 2020-03-28 2021-06-18 2020-09-24 (14) pick-up double cabines, Governance (Direct) onze (11) mono cabines et deux (02) stations wagon. BJ-WACA -160122-GO-RFB / Under Acquisition de cent vingt-cinq Integrated Management of Single Stage - One IDA / D4770 Post Request for Bids Open - National 325,600.00 0.00 Implementati 2020-06-30 2020-03-16 2020-07-05 2020-08-16 2020-09-15 2020-10-20 2021-04-18 (125) motos au profit de Gazetted Forests Envelope on CTAF, ONAB et CENATEL. BJ-WACA -166588-GO-DIR / Fourniture, installation et Pending Support to Forests maintenance d'une plateforme IDA / D4770 Post Direct Selection Direct 48,700.00 0.00 Implementati 2020-04-27 2020-05-02 2020-06-06 2020-12-03 Governance de vidéoconférence au profit on du MCVDD. BJ-WACA -170502-GO-RFQ / Acquisition de groupe Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 27,800.00 52,751.58 Signed 2020-06-27 2021-06-18 2020-08-22 2021-06-18 2021-02-18 électrogène au profit de Governance Quotations Envelope l'UIGP. BJ-WACA -173868-GO-UN / Acquisition de cent vingt-cinq Support to Forests UN Agencies (125) motos cross et trois (03) IDA / D4770 Post Direct 450,300.00 530,271.00 Signed 2020-05-25 2021-06-03 2020-05-30 2021-06-03 2020-07-04 2021-06-18 2020-12-31 Governance (Direct) stations wagon au profit de l'UIGP. BJ-WACA -217675-GO-RFQ / Under Acquisition de consommables Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 50,000.00 0.00 Implementati 2021-04-25 2021-06-20 2021-12-17 informatiques au profit du Governance Quotations Envelope on projet, CTAF et ONAB. BJ-WACA -217676-GO-RFQ / Under Acquisition de fournitures de Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 53,000.00 0.00 Implementati 2021-04-04 2021-05-30 2021-11-26 bureau au profit du projet, Governance Quotations Envelope on CTAF et ONAB. BJ-WACA -217677-GO-RFQ / Pending Acquisition de matériels Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 83,000.00 0.00 Implementati 2021-04-04 2021-05-30 2021-11-26 informatiques au profit du Governance Quotations Envelope on projet, CTAF et ONAB. BJ-WACA -217682-GO-RFQ / Acquisition de matériels pour Request for Single Stage - One IDA / D4770 Project Management Post Limited 9,500.00 8,412.70 Signed 2021-05-31 2021-06-24 2021-07-26 2021-06-24 2022-01-22 la mise en place du Manuel de Quotations Envelope Gestion des Plainte (MGP). BJ-WACA -217747-GO-RFQ / Pending Acquisition de petits Request for Single Stage - One IDA / D4770 Project Management Post Limited 40,000.00 0.00 Implementati 2021-08-23 2021-10-18 2022-04-16 équipements de surveillance Quotations Envelope on au profit de l'ONAB et CTAF. BJ-WACA -217748-GO-RFQ / Pending Request for Single Stage - One Acquisition de matériels pour IDA / D4770 Project Management Post Limited 30,000.00 0.00 Implementati 2021-10-23 2021-12-18 2022-06-16 Quotations Envelope les groupes de reboisement. on BJ-WACA -217749-GO-RFQ / Acquisition d'équipements de Pending Request for Single Stage - One protection individuelle de IDA / D4770 Project Management Post Limited 76,000.00 0.00 Implementati 2021-10-04 2021-11-29 2022-05-28 Quotations Envelope lutte contre le feu au profit on des CTAF et ONAB. BJ-WACA -217752-GO-RFQ / Support to Forests Request for Single Stage - One Acquisition de matériels et IDA / D4770 Post Limited 19,000.00 18,053.77 Signed 2021-03-31 2021-05-20 2021-05-26 2021-06-17 2021-11-22 Governance Quotations Envelope équipements de bureau. Page 3 BJ-WACA -217794-GO-RFQ / Pending Acquisition et pose d'une Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 16,000.00 0.00 Implementati 2021-03-20 2021-05-15 2021-11-11 enseigne lumineuse au profit Governance Quotations Envelope on du projet. BJ-WACA -232705-GO-RFB / Under Acquisition de sept (07) IDA / D4770 Project Management Post Direct Selection Direct 840,000.00 0.00 Implementati 2021-09-21 2021-05-19 2021-09-26 2021-10-31 2022-04-29 camions citerne au profit des on CTAF et ONAB NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -142560-NC-RFB / Gardiennage/surveillance Pending dans les six (06) forêts Integrated Management of Single Stage - One IDA / D4770 Post Request for Bids Open - National 75,000.00 0.00 Implementati 2020-07-06 2020-07-11 2020-08-22 2020-09-21 2020-10-26 2021-04-24 Classées: Dan, Logozohè, Gazetted Forests Envelope on Kétou, Ouémé boukou, Agoua et Tchaourou-Toui-Kilibo. BJ-WACA -143599-CS-CDS / Pending Élaborer et signet le contrat Integrated Management of IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire Gazetted Forests on (Forêt Classée de Kétou) BJ-WACA -143601-CS-CDS / Élaborer et signer le contrat Pending Integrated Management of avec la radio communautaire IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 Gazetted Forests (Forêt Classée de Alibori on Supérieur Sud) BJ-WACA -143604-CS-CDS / Élaborer et signet le contrat Pending Integrated Management of avec la radio communautaire IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 Gazetted Forests (Forêt Classée de Ouémé on supérieur) BJ-WACA -143600-CS-CDS / Pending Élaborer et signet le contrat Integrated Management of IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire Gazetted Forests on (Forêt Classée de Logozohè). BJ-WACA -143605-CS-CDS / Élaborer et signer le contrat Pending Integrated Management of avec la radio communautaire IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 Gazetted Forests (Forêt Classée de Trois on Rivières) BJ-WACA -143301-CS-CDS / Pending Élaborer et signer le contrat Integrated Management of IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire Gazetted Forests on (Forêt classée de Dan). BJ-WACA -143606-CS-CDS / Élaborer et signer le contrat Pending Integrated Management of avec la radio communautaires IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 Gazetted Forests (Forêt Classée de l'Alibori on Supérieur Nord) BJ-WACA -143602-CS-CDS / Pending Élaborer et signet le contrat Integrated Management of IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaires Gazetted Forests on (Forêt Classée de Agoua). BJ-WACA -143603-CS-CDS / Élaborer et signer le contrat Pending avec la radio communautaire Integrated Management of IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 (Forêt Classée de Tchaourou- Gazetted Forests on Toui-Kilibo et Ouémé- Boukou). BJ-WACA -143608-CS-CDS / Élaborer et signer le contrat Pending Integrated Management of avec la radio communautaire IDA / D4770 Post Direct Selection Direct 4,000.00 0.00 Implementati 2020-07-20 2020-07-25 2020-08-29 2021-02-25 Gazetted Forests (Forêt Classée de Ouénou- on Bénou) BJ-WACA -162607-NC-RFQ / Recrutement d'un transitaire pour l'enlèvement et Support to Forests Request for Single Stage - One IDA / D4770 Post Limited 17,300.00 18,120.01 Signed 2020-05-25 2021-06-22 2020-07-20 2021-06-22 2021-01-16 l'immatriculation des Governance Quotations Envelope matériels roulants à acquérir par le biais de l'UNOPS. BJ-WACA -162778-NC-DIR / Contractualiser avec un opérateur GSM pour assurer le Integrated Management of payement à bonne date des IDA / D4770 Post Direct Selection Direct 9,000.00 15,027.01 Signed 2020-05-25 2020-04-02 2020-05-30 2020-04-16 2020-07-04 2021-06-24 2020-12-31 Gazetted Forests prestations liées au reboisement/intensification agricole. BJ-WACA -166117-CS-CQS / Recrutement d'une agence de Pending Integrated Management of Request for Single Stage - One communication pour mettre IDA / D4770 Post Open 86,800.00 0.00 Implementati 2020-07-25 2020-09-19 2021-03-18 Gazetted Forests Quotations Envelope en oeuvre la stratégie de on communication de l'UIGP. BJ-WACA -190908-NC-DIR / Recrutement d'un transitaire pour l'enlèvement et Under Support to Forests l'immatriculation de cent vingt- IDA / D4770 Post Direct Selection Direct 20,000.00 0.00 Implementati 2020-09-07 2020-08-28 2020-09-12 2021-06-18 2020-10-17 2021-04-15 Governance cinq (125) motos cross et six on (06) véhicules acquis par le biais de l'UNOPS. Page 4 BJ-WACA -217655-CS-CDS / Elaborer et signer des conventions pour le Pending Integrated Management of Community Driven gardiennage des plantations IDA / D4770 Post Direct 112,000.00 0.00 Implementati 2021-12-20 2021-12-25 2022-01-29 2022-07-28 Gazetted Forests Development de 2020 et 2021 avec des on strutures de co-gestions au profit de l'UIGP et de l'ONAB CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -142475-CS-CQS / Etude socio-économique des villages riverains des forêts Consultant classées ciblées: Kétou, Dan, Development of Selected Pending IDA / D4770 Post Qualification Open - National 80,000.00 0.00 2020-04-13 2020-05-04 2020-06-17 2020-07-17 2020-08-21 2021-02-17 Logozohè, Ouémé-boukou, NTFP Value Chains Implementation Selection Agoua, Tchaourou-Toui- Kilibo, trois rivières, alibori supérieur et Ouénou Bénou. BJ-WACA -143202-CS-CQS / Recrutement d'un cabinet Consultant pour réaliser l'état des lieux Integrated Management of Pending IDA / D4770 Post Qualification Limited 197,574.00 0.00 2020-05-28 2020-06-11 2020-07-11 2020-08-15 2021-02-11 de l'occupation des 10 forêts Gazetted Forests Implementation Selection classées sous gestion du projet. BJ-WACA -143206-CS-CQS / Recrutement d'un cabinet pour réaliser l'étude d'inventaire (faune et flore) Consultant pour établir la situation de Integrated Management of Pending IDA / D4770 Post Qualification Limited 60,000.00 0.00 2020-05-25 2020-06-08 2020-07-08 2020-08-12 2021-02-08 référence de la biodiversité Gazetted Forests Implementation Selection dans les six (06) forêts classées:Kétou, Dan, Logozolè, Ouémé-Boukou, Agoua, Tchaourou-Toui- Kilibo. BJ-WACA -143218-CS-CQS / Recrutement d'un cabinet Consultant Integrated Management of Pending pour réaliser l'étude de sol IDA / D4770 Post Qualification Limited 70,000.00 0.00 2020-05-25 2020-06-08 2020-07-08 2020-08-12 2021-02-08 Gazetted Forests Implementation des séries de production des Selection 10 forêts classées. BJ-WACA -143219-CS-CQS / Recrutement d'un cabinet Consultant Pending pour évaluer le potentiel en IDA / D4770 Project Management Post Qualification Limited 75,000.00 0.00 2020-05-18 2020-06-01 2020-07-01 2020-08-05 2021-02-01 Implementation noix de karité autour et dans Selection les forêts classées. BJ-WACA -143223-CS-CQS / Recrutement d'un cabinet Consultant Pending pour analyser les chaînes de IDA / D4770 Project Management Post Qualification Limited 22,000.00 0.00 2020-06-22 2020-07-06 2020-08-05 2020-09-09 2021-03-08 Implementation valeurs porteuses et du Selection marché de karité. BJ-WACA -143230-CS-CQS / Recrutement d'un cabinet Consultant Pending pour analyser les chaînes de IDA / D4770 Project Management Post Qualification Limited 22,000.00 0.00 2020-06-22 2020-07-06 2020-08-05 2020-09-09 2021-03-08 Implementation valeurs porteuses et du Selection marché du miel. BJ-WACA -143288-CS-CQS / Recrutement d'un cabinet pour réaliser le zonage, délimiter les différentes séries Consultant Development of Selected Pending et rédiger les plans IDA / D4770 Post Qualification Limited 50,000.00 0.00 2020-05-18 2020-06-01 2020-07-01 2020-08-05 2021-02-01 NTFP Value Chains Implementation d'aménagement des forêts Selection calssées : Alibori Supérieue,Trois Rivières et Ouénon Bénou. BJ-WACA -143290-CS-CQS / Recrutement d'un cabinet pour réaliser les études Consultant Development of Selected Pending techniques, contrôle et IDA / D4770 Post Qualification Limited 80,000.00 0.00 2020-05-25 2020-06-08 2020-07-08 2020-08-12 2021-02-08 NTFP Value Chains Implementation supervision des travaux de Selection réhabilitation/construction des bases vie des 10 CTAF. BJ-WACA -143291-CS-CQS / Recrutement d'un cabinet pour analyser et proposer les Consultant Development of Selected Pending options efficaces de gestion IDA / D4770 Post Qualification Limited 62,500.00 0.00 2020-06-08 2020-06-22 2020-07-22 2020-08-26 2021-02-22 NTFP Value Chains Implementation durable des forêts classées Selection dans la sous région et à l'international. BJ-WACA -143294-CS-CQS / Recrutmt d'un cabinet pr réaliser l'étude pr l'identification au niveau national de système Consultant d'agrofesterie et Integrated Management of Pending IDA / D4770 Post Qualification Limited 26,000.00 0.00 2020-06-08 2020-06-22 2020-07-22 2020-08-26 2021-02-22 d'intensification agricoles Gazetted Forests Implementation Selection adaptés aux zones agroécologiques autour des 10 forêts classées et du mécanisme de durabilité de leur mise en oeuvre. BJ-WACA -143297-CS-CQS / Recrutement d'une ONG à mandater pour l'encadrement Consultant Integrated Management of Pending des agriculteurs des forêts IDA / D4770 Post Qualification Limited 24,000.00 0.00 2020-07-20 2020-08-03 2020-09-02 2020-10-07 2021-04-05 Gazetted Forests Implementation classées: Alibori Selection Supérieue,Trois Rivières et Ouénou Bénou. BJ-WACA -143303-CS-CQS / Consultant Recrutement d'un cabinet Integrated Management of Pending IDA / D4770 Post Qualification Limited 40,000.00 0.00 2020-07-06 2020-07-20 2020-08-19 2020-09-23 2021-03-22 pour identifier les Gazetted Forests Implementation Selection technologies efficace de carbonisation. Page 5 BJ-WACA -143304-CS-CQS / Recrutement d'un cabinet Consultant Pending pour élaborer la stratégie IDA / D4770 Project Management Post Qualification Limited 50,000.00 0.00 2020-07-13 2020-07-27 2020-08-26 2020-09-30 2021-03-29 Implementation d'installation des plantations Selection de karité. BJ-WACA -143577-CS-CQS / Recrutement d'un cabinet pour réaliser le zonage, délimiter les différentes séries Consultant Development of Selected Pending et rédiger les plans IDA / D4770 Post Qualification Limited 50,000.00 0.00 2020-05-18 2020-06-01 2020-07-01 2020-08-05 2021-02-01 NTFP Value Chains Implementation d'aménagement des forêts Selection calssées: Ouémé Spérieur, Agoua et Tchaourou-Toui- Kilibo BJ-WACA -143588-CS-CQS / Recrutement d'un cabinet pour réaliser le zonage, Consultant délimiter les différentes séries Development of Selected Pending IDA / D4770 Post Qualification Limited 50,000.00 0.00 2020-05-18 2020-06-01 2020-07-01 2020-08-05 2021-02-01 et rédiger les plans NTFP Value Chains Implementation Selection d'aménagement des forêts calssées: Kétou, Dan, logozohè et Ouémé-boukou. BJ-WACA -143594-CS-CQS / Recrutement d'une ONG à mandater pour l'encadrement Consultant Integrated Management of Pending des agriculteurs des forêts IDA / D4770 Post Qualification Limited 23,000.00 0.00 2020-07-20 2020-08-03 2020-09-02 2020-10-07 2021-04-05 Gazetted Forests Implementation classées: Ouémé Spérieur, Selection Agoua et Tchaourou-Toui- Kilibo. BJ-WACA -143595-CS-CQS / Recrutement d'une ONG à Consultant mandater pour l'encadrement Integrated Management of Pending IDA / D4770 Post Qualification Limited 23,000.00 0.00 2020-07-20 2020-08-03 2020-09-02 2020-10-07 2021-04-05 des agriculteurs des forêts Gazetted Forests Implementation Selection classées: Kétou, Dan, logozohè et Ouémé-boukou. BJ-WACA -143731-CS-CQS / Recrutement d'un cabinet pour réaliser l'étude d'impact environnemental et social et le Consultant plan d'action et de Integrated Management of Pending IDA / D4770 Post Qualification Limited 200,000.00 0.00 2020-08-24 2020-09-07 2020-10-07 2020-11-11 2021-05-10 réinstallation pour les Gazetted Forests Implementation Selection activités du projet (Reboisement, intensification agricole et agroferesterie, transhumance) BJ-WACA -144172-CS-LCS / Recrutement d'un cabinet Support to Forests Least Cost Pending IDA / D4770 Post Open - National 10,000.00 0.00 2020-04-13 2020-05-04 2020-06-17 2020-07-15 2020-08-14 2020-09-18 2020-10-23 2021-04-21 pour réaliser l'audit annuel du Governance Selection Implementation projet exercice 2020. BJ-WACA -143300-CS-INDV / Recrutement d'une Agence de Communication pour élaborer la stratégie de Consultant Integrated Management of Under communication sur IDA / D4770 Post Qualification Open - National 36,000.00 0.00 2020-03-23 2020-04-29 2020-04-13 2020-06-30 2020-05-27 2020-06-26 2020-07-31 2021-01-27 Gazetted Forests Implementation l'aménagement intégré et Selection durable des forêts classées et assister l'UIGP à sa mise en oeuvre. BJ-WACA -156905-CS-CQS / Recrutement d'un cabinet pour réaliser l'état des lieux Consultant Integrated Management of des occupations dans les IDA / D4770 Post Qualification Limited 90,000.00 0.00 Under Review 2020-04-20 2021-06-24 2020-05-04 2020-06-03 2020-07-08 2021-01-04 Gazetted Forests forêts classées ciblées de : Selection Dogo-Kétou, Trois Rivières et ouénou Bénou. BJ-WACA -156907-CS-CQS / Recrutement d'un cabinet pour réaliser l'état des lieux Consultant Integrated Management of des occupations dans les IDA / D4770 Post Qualification Limited 90,000.00 0.00 Under Review 2020-04-20 2021-06-24 2020-05-04 2020-06-03 2020-07-08 2021-01-04 Gazetted Forests forêts classées ciblées de: Selection Alibori Supérieur, Dan et Ouémé Boukou. BJ-WACA -156912-CS-CQS / Recrutement d'un cabinet pour réalier l'état des lieux Consultant des occupations dans les Integrated Management of IDA / D4770 Post Qualification Limited 98,500.00 0.00 Under Review 2020-04-20 2021-06-24 2020-05-04 2020-06-03 2020-07-08 2021-01-04 forêts classées ciblées de : Gazetted Forests Selection Ouémé Supérieur-Ndali, Tchaourou Toui-Kilibo, Agoua et Logozohè. BJ-WACA -160186-CS-CQS / Recrutement d'un cabinet pour actualisation du Consultant zonage,matérialisation des Development of Selected IDA / D4770 Post Qualification Limited 72,300.00 140,290.52 Signed 2020-05-25 2020-04-03 2020-06-08 2021-06-23 2020-07-08 2021-06-23 2020-08-12 2021-06-23 2021-02-08 séries et révision des plans NTFP Value Chains Selection d'aménagement des forêts classées d'Aliborie Supérieur, Dan, Ouémé-Boukou. BJ-WACA -160187-CS-CQS / Recrutement d'un cabinet pour actualisation du Consultant zonage,matérialisation des Development of Selected IDA / D4770 Post Qualification Limited 72,300.00 150,305.63 Signed 2020-05-25 2020-04-03 2020-06-08 2021-06-23 2020-07-08 2021-06-23 2020-08-12 2021-06-23 2021-02-08 séries et révision des plans NTFP Value Chains Selection d'aménagement des forêts classées de Kétou, Trois Rivières et Ouénou Bénou. BJ-WACA -160188-CS-CQS / Recrutement d'un cabinet pour actualisation du zonage,matérialisation des Consultant Development of Selected séries et révision des plans IDA / D4770 Post Qualification Limited 72,300.00 140,745.75 Signed 2020-05-25 2020-04-03 2020-06-08 2021-06-23 2020-07-08 2021-06-23 2020-08-12 2021-06-23 2021-02-08 NTFP Value Chains d'aménagement des forêts Selection classées de Ouémé Supérieur- Ndali, Tchaourou Toui-Kilibo et Logozohè. Page 6 BJ-WACA -160191-CS-CQS / Recrutement d'un cabinet pour réaliser l'étude socio économique des villages Consultant Development of Selected Under riverains des forêts classées IDA / D4770 Post Qualification Limited 70,000.00 0.00 2020-05-11 2020-04-02 2020-05-25 2020-06-24 2020-07-29 2021-01-25 NTFP Value Chains Implementation ciblées de Dan, Ouémé Selection Boukou, Dogo-Kétou, Tchaourou Toui-kilibo,Agoua et logozohè. BJ-WACA -160192-CS-CQS / Recrutement d'un cabinet pour réaliser l'étude socio économique des villages Consultant Development of Selected Under riverains des forêts classées IDA / D4770 Post Qualification Limited 70,000.00 0.00 2020-05-11 2020-04-02 2020-05-25 2020-06-24 2020-07-29 2021-01-25 NTFP Value Chains Implementation ciblées de Trois Rivières, Selection Ouénou Bénou, Ouémé Supérieur-Ndali et Aliborie Supérieur. BJ-WACA -162789-CS-CQS / Recrutement d'un cabinet d'audit pour la vérification du Integrated Management of Least Cost processus de payement et IDA / D4770 Post Open - National 69,500.00 0.00 Under Review 2020-05-25 2020-05-05 2020-06-15 2020-07-29 2020-08-26 2020-09-25 2020-10-30 2020-12-04 2021-06-02 Gazetted Forests Selection l'effectivité de la réalisation des travaux de reboisement/intensification. BJ-WACA -178742-CS-CQS / Recrutement d'un cabinet d'audit pour la vérification du Consultant Pending processus de payement et IDA / D4770 Project Management Post Qualification Open - National 69,500.00 0.00 2020-06-30 2020-07-21 2020-09-03 2020-10-03 2020-11-07 2021-05-06 Implementation l'effectivité de la réalisation Selection des travaux de reboisement/intensification. BJ-WACA -190907-CS-CQS / Recrutement d'un consultant pour l'étude de prospection Consultant Integrated Management of Under hydrogéologique en vue de IDA / D4770 Post Qualification Limited 20,000.00 0.00 2020-11-23 2020-10-21 2020-12-07 2021-01-06 2021-02-10 2021-08-09 Gazetted Forests Implementation détecter la présence d'eau au Selection niveau des bases vie des CTAF. BJ-WACA -203699-CS-CQS / Recrutement d’un cabinet/Bureau d’étude pour évaluation sociale et l’élaboration de Plans d’Action Consultant Integrated Management of de Réinstallation (PAR) dans le IDA / D4770 Post Qualification Open - National 98,000.00 0.00 Under Review 2020-12-14 2021-06-24 2021-01-04 2021-02-17 2021-03-19 2021-04-23 2021-10-20 Gazetted Forests cadre des travaux Selection d’aménagement des forêts classées de Dogo-Kétou, Ouénou-Bénou et Trois Rivières. BJ-WACA -203700-CS-CQS / Recrutement d’un cabinet/Bureau d’étude pour évaluation sociale et l’élaboration de Plans d’Action Consultant Integrated Management of de Réinstallation (PAR) dans le IDA / D4770 Post Qualification Open - National 98,000.00 0.00 Under Review 2020-12-14 2021-06-24 2021-01-04 2021-02-17 2021-03-19 2021-04-23 2021-10-20 Gazetted Forests cadre des travaux Selection d’aménagement des forêts classées de Agoua, Logozohè, Ouémé Supérier-N’Dali, et Tchaourou Toui Kilibo. BJ-WACA -203701-CS-CQS / Recrutement d’un cabinet/Bureau d’étude pour évaluation sociale et l’élaboration de Plans d’Action Consultant Integrated Management of de Réinstallation (PAR) dans le IDA / D4770 Post Qualification Open - National 98,000.00 0.00 Under Review 2020-12-14 2021-06-24 2021-01-04 2021-02-17 2021-03-19 2021-04-23 2021-10-20 Gazetted Forests cadre des travaux Selection d’aménagement des forêts classées de Aliborie Supérieur, Dan, Ouémé-Boukou et Toffo- Lama sud. BJ-WACA -203770-CS-CQS / Recrutement d’un cabinet/Bureau d’étude pour réaliser l’Etude d’Impact Consultant Environnementale et Sociale Integrated Management of Under IDA / D4770 Post Qualification Open - National 98,000.00 0.00 2020-12-21 2021-03-24 2021-01-11 2021-04-12 2021-02-24 2021-03-26 2021-04-30 2021-10-27 (EIES) dans le cadre des Gazetted Forests Implementation Selection travaux d’aménagement des forêts classées de Alibori Supérieur, Ouémé-Boukou, Lama Sud et Dan. BJ-WACA -203771-CS-CQS / Recrutement d’un cabinet/Bureau d’étude pour réaliser l’Etude d’Impact Consultant Environnementale et Sociale Integrated Management of Under IDA / D4770 Post Qualification Open - National 98,000.00 0.00 2020-12-21 2021-03-24 2021-01-11 2021-04-12 2021-02-24 2021-03-26 2021-04-30 2021-10-27 (EIES) dans le cadre des Gazetted Forests Implementation Selection travaux d’aménagement des forêts classées de Dogo- Kétou, Ouémé-Bénou et Trois Rivières. BJ-WACA -203773-CS-CQS / Recrutement d’un cabinet/Bureau d’étude pour réaliser l’Etude d’Impact Environnementale et Sociale Consultant Integrated Management of Under (EIES) dans le cadre des IDA / D4770 Post Qualification Open - National 98,000.00 0.00 2020-12-21 2021-03-24 2021-01-11 2021-04-12 2021-02-24 2021-03-26 2021-04-30 2021-10-27 Gazetted Forests Implementation travaux d’aménagement des Selection forêts classées de Ouémé Supérieur N’Dali, Tchaourou Toui Kilibo, Agoua et Logozohè. BJ-WACA -217614-CS-CQS / Recrutement d'un cabinet pour réaliser l'étude de Consultant Integrated Management of prospection hydrologique au IDA / D4770 Post Qualification Open - National 20,000.00 0.00 Under Review 2021-08-24 2021-06-21 2021-09-14 2021-10-28 2021-11-27 2022-01-01 2022-06-30 Gazetted Forests niveau des périmètres des Selection base vies secondaires et des postes avancées des CTAF. Page 7 BJ-WACA -217625-CS-CQS / Recrutement d'un cabinet Consultant Pending pour organiser l'occupation IDA / D4770 Project Management Post Qualification Open - National 50,000.00 0.00 2021-08-17 2021-09-07 2021-10-21 2021-11-20 2021-12-25 2022-06-23 Implementation des séries agricoles dans les Selection dix forêts classées. BJ-WACA -217636-CS-CQS / Recrutement d'un cabinet pour analyser et proposer les Consultant options d'arrangement Integrated Management of Pending IDA / D4770 Post Qualification Open - National 84,000.00 0.00 2021-04-23 2021-05-14 2021-06-27 2021-07-27 2021-08-31 2022-02-27 institutionnel efficaces de Gazetted Forests Implementation Selection gestion durable des forêts classées dans la sous régio et à l'international. BJ-WACA -217632-CS-CQS / Recrutement d'un cabinet pour réaliser l'étude pour l'identification au niveau Consultant national de système Integrated Management of Pending IDA / D4770 Post Qualification Open - National 32,000.00 0.00 2021-09-27 2021-10-18 2021-12-01 2021-12-31 2022-02-04 2022-08-03 d'agroforesterie et Gazetted Forests Implementation Selection d'intensification agricoles adaptés aux zones agroécologiques autour des 10 forêts classées. BJ-WACA -232697-CS-QCBS / Recrutement d'un cabinet/Bureau d'étude pour Integrated Management of Quality And Cost- Under IDA / D4770 Post Open - International 300,000.00 0.00 2021-06-14 2021-05-27 2021-07-05 2021-08-18 2021-09-15 2021-10-15 2021-11-19 2021-12-24 2022-12-24 la réalisation de l'inventaire Gazetted Forests Based Selection Implementation forestier dans les forêts classées BJ-WACA -232700-CS-QCBS / Recrutement d'un cabinet/Bureau d'étude pour Integrated Management of Quality And Cost- Under IDA / D4770 Post Open - International 180,000.00 0.00 2021-06-14 2021-05-27 2021-07-05 2021-06-14 2021-08-18 2021-09-15 2021-10-15 2021-11-19 2021-12-24 2022-12-24 la réalisation du Gazetted Forests Based Selection Implementation dénombrement de la faune dans les forêts classées. BJ-WACA -234568-CS-QCBS / Recrutement d'une firme pour appui au développement Integrated Management of Quality And Cost- Under du système agroforesterie IDA / D4770 Post Open - International 500,000.00 0.00 2021-08-27 2021-06-23 2021-09-17 2021-10-31 2021-11-28 2021-12-28 2022-02-01 2022-03-08 2023-03-08 Gazetted Forests Based Selection Implementation dans les forêts classées dans la zone d'intervention du projet. BJ-WACA -234841-CS-CQS / Recrutement d'un auditeur Consultant Under interne des comptes des IDA / D4770 Project Management Post Qualification Open - National 30,000.00 0.00 2021-07-20 2021-06-04 2021-08-10 2021-09-23 2021-10-23 2021-11-27 2022-05-26 Implementation projets de l'Unité Intégrée de Selection Gestion des Projets (UIGP). INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -142480-CS-INDV / Elaborer les outils et Individual méthodes de suivi et Development of Selected Pending IDA / D4770 Post Consultant Limited 10,000.00 0.00 2020-05-18 2020-07-06 2020-07-27 2020-08-31 2021-02-27 d'évaluation de la NTFP Value Chains Implementation Selection performance des agents forestiers du Projet. BJ-WACA -143198-CS-INDV / Recrutement d'un consultant individuel pour l'étude Individual d'analyse des opportunités et Development of Selected Pending IDA / D4770 Post Consultant Limited 17,500.00 0.00 2020-06-23 2020-06-28 2020-07-19 2020-08-23 2021-02-19 contraintes inhérentes à NTFP Value Chains Implementation Selection l'arrangement institutionnel en place pour la gestion des forêts classées. BJ-WACA -143208-CS-INDV / Recrutement d'un consultant Individual Integrated Management of Pending individuel pour évaluer et IDA / D4770 Post Consultant Limited 17,500.00 0.00 2020-06-29 2020-07-04 2020-07-25 2020-08-29 2021-02-25 Gazetted Forests Implementation réorganiser les Marchés Selection Ruraux de Bois. BJ-WACA -143231-CS-INDV / Recrutement d'un consultant individuel pour évaluer le fonctionnement du FNDF et Individual Development of Selected Pending autre Fonds (FSOA) dédiés aux IDA / D4770 Post Consultant Limited 17,500.00 0.00 2020-05-11 2020-05-16 2020-06-06 2020-07-11 2021-01-07 NTFP Value Chains Implementation aires protégées pour Selection examiner les possibilités d'ouverture d'un guichet spécifique aux forêts classées. BJ-WACA -143236-CS-INDV / Recrutement d'un consultant individuel pour réaliser Individual Pending l'inventaire analytique des IDA / D4770 Project Management Post Consultant Limited 17,500.00 0.00 2020-04-20 2020-04-25 2020-05-16 2020-06-20 2020-12-17 Implementation techniques de reproduction Selection grandeur nature du karité au Bénin et dans la sous région. BJ-WACA -143265-CS-INDV / Recrutement d'un consultant individuel pour réaliser l'état des lieux des Individual Pending individus, groupements et IDA / D4770 Project Management Post Consultant Limited 16,500.00 0.00 2020-05-25 2020-05-30 2020-06-20 2020-07-25 2021-01-21 Implementation structures privées engagés Selection dans l'apiculture, le commerce du miel dans les villages riverains des forêts classées. Page 8 BJ-WACA -143269-CS-INDV / Recrutement d'un consultant individuel pour réaliser l'état des lieux des individus, Individual Pending groupements et structures IDA / D4770 Project Management Post Consultant Limited 17,500.00 0.00 2020-06-15 2020-06-20 2020-07-11 2020-08-15 2021-02-11 Implementation privées engagés dans la Selection transformation de noix de karité dans les villages riveraines des forêts classées. BJ-WACA -143278-CS-INDV / Recrutement d'un consultant Individual Pending individuel pour élaborer le IDA / D4770 Project Management Post Consultant Limited 16,000.00 0.00 2020-04-20 2020-04-25 2020-05-16 2020-06-20 2020-12-17 Implementation manuel de développement de Selection la chaîne de valeur de karité. BJ-WACA -143283-CS-INDV / Recrutement d'un consultant Individual Pending individuel pour élaborer le IDA / D4770 Project Management Post Consultant Limited 16,000.00 0.00 2020-04-20 2020-04-25 2020-05-16 2020-06-20 2020-12-17 Implementation manuel de développement de Selection la filière miel. BJ-WACA -143285-CS-CDS / Élaborer et signer une convention avec le Centre Integrated Management of Pending International de Recherche en IDA / D4770 Post Direct Selection Direct 50,000.00 0.00 2020-06-08 2020-06-18 2020-08-22 2021-02-18 Gazetted Forests Implementation Agroforesterie pour l'identification des techniques d'agroforesterie. BJ-WACA -145210-CS-INDV Individual / Recrutement d'un Assistant Support to Forests Under IDA / D4770 Post Consultant Open 144,000.00 0.00 2020-01-20 2019-11-12 2020-03-09 2021-06-24 2020-03-30 2021-06-24 2020-05-04 2020-10-31 Technique International (ATI) Governance Implementation Selection au profit de l'UIGP. BJ-WACA -145213-CS-INDV Individual / Recrutement d'un Chargé Support to Forests Pending IDA / D4770 Post Consultant Open 14,400.00 0.00 2020-03-30 2020-05-18 2020-06-08 2020-07-13 2021-01-09 Suivi-Evaluation au profit du Governance Implementation Selection projet. BJ-WACA -145235-CS-INDV Individual Support to Forests Under / Recrutement d'un comptable IDA / D4770 Post Consultant Open 14,400.00 0.00 2020-03-30 2019-12-20 2020-05-18 2020-06-08 2020-07-13 2021-01-09 Governance Implementation au profit du projet. Selection BJ-WACA -166115-CS-INDV / Recrutement d'un consultant Individual Integrated Management of Pending individuel pour élaborer la IDA / D4770 Post Consultant Limited 34,700.00 0.00 2020-06-15 2020-06-20 2020-07-11 2020-08-15 2021-02-11 Gazetted Forests Implementation stratégie de communication Selection de l'UIGP. BJ-WACA -178745-CS-CDS / Recrutement d'un consultant individuel pour la IDA / D4770 Project Management Post Direct Selection Direct 180,000.00 192,108.12 Signed 2020-07-30 2020-06-30 2020-08-09 2021-06-23 2020-10-13 2021-06-23 2021-04-11 modernisation du processus de production du miel au Bénin. BJ-WACA -203697-CS-INDV / Recrutement d'un consultant pour réaliser l’étude technique d’ouverture et Individual d’aménagement de pistes Integrated Management of Under IDA / D4770 Post Consultant Open 20,000.00 0.00 2020-11-30 2020-11-20 2021-01-18 2021-02-08 2021-03-15 2021-09-11 forestières dans les forêts Gazetted Forests Implementation Selection classées de Ouémé-Boukou, Agoua, Tchaourou -Toui- Kilibo, Dan, Kétou et Logozohè. BJ-WACA -217622-CS-INDV / Recrutement d'un consultant Individual Integrated Management of Pending individuel pour élaborer le IDA / D4770 Post Consultant Open 20,000.00 0.00 2021-04-05 2021-05-24 2021-06-14 2021-07-19 2022-01-15 Gazetted Forests Implementation Plan de Gestion des Pestes et Selection Pesticides du PFC-B. BJ-WACA -217629-CS-INDV / Recrutement d'un consultant Individual individuel pour réaliser les Pending IDA / D4770 Project Management Post Consultant Open 20,000.00 0.00 2021-04-26 2021-06-14 2021-07-05 2021-08-09 2022-02-05 études techniques de pistes Implementation Selection d'accès aux plantations de 2021. BJ-WACA -217633-CS-INDV / Recrutement d'un consultant Individual Pending individuel pour élaborer un IDA / D4770 Project Management Post Consultant Open 6,000.00 0.00 2021-06-29 2021-08-17 2021-09-07 2021-10-12 2022-04-10 Implementation guide technique de Selection production d'acacia. BJ-WACA -217641-CS-CDS / Elaborer et signer une convention avec le laboratoire de Biomathématiques et d'Estimations Forestières et le Pending IDA / D4770 Project Management Post Direct Selection Direct 230,000.00 0.00 2021-04-15 2021-04-25 2021-06-29 2021-12-26 laboratoire d'Ecologie, de Implementation Botanique et de Biologie Végétale pour la réalisation de l'inventaire forestier dans les forêts classées. BJ-WACA -217644-CS-CDS / Elaborer et signer une convention avec le laboratoire Integrated Management of Pending d'Ecologie Appliquée pour la IDA / D4770 Post Direct Selection Direct 120,000.00 0.00 2021-04-15 2021-04-25 2021-06-29 2021-12-26 Gazetted Forests Implementation réalisation du dénombrement de la faune dans les forêts classées. BJ-WACA -217638-CS-CQS / Recrutement d'un consultant individuel pour réaliser l'état Individual des lieux des individus, Integrated Management of Under IDA / D4770 Post Consultant Open 18,000.00 0.00 2021-10-20 2021-06-23 2021-12-08 2021-12-29 2022-02-02 2022-08-01 groupement et structures Gazetted Forests Implementation Selection privées engagés dans l'apiculture, le commerce du miel. Page 9 Summarized Procurement Plan I. GENERAL Project information: Borrower: CCARDESA Project Name: Agricultural Productivity Program for Southern Africa Project ID No: P164486 Grant No.: Project Implementing Agency: CCARDESA Bank’s approval Date of the Procurement Plan: February 13, 2019 Date of General Procurement Notice: Period covered by this procurement plan: February 13, 2019 to September 2020 II. Goods and Works and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by IDA as stated in Appendix 1 to the Guidelines for Procurement: Thresholds for Procurement Methods and Prior Review Goods, Works and Non- Consulting Services Procurement Approaches and Methods (US$ Prior millions) Review Category Open Open Request for (US$ millions) International National Quotation (RfQ) Works ≥ 15 ≥7 < 0.2 ≤ 0.2 Goods, IT, and non- ≥6 ≥1 < 0.1 ≤ 0.1 consulting services 2. Reference to (if any) Project Operational/Procurement Manual: The Procurement Plan also forms part of the Project Implementation Manual approved on May 2019. 1 3. Procurement Packages with Methods and Time Schedule Procurement of Goods & Non-consulting Services Summary 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB NIL NIL NIL NIL NIL (Works) Summary of the NCB NIL NIL NIL NIL NIL (Works) Summary of the ICB NIL NIL No NIL No major goods (Goods) Summary of the NCB NIL NIL NIL NIL NIL (Goods) Summary of the RfQ 0.03 6 No Post Request for (Goods & Non- Quotations Consulting Services) Summary of the DC 0.2million 2 No Post (Non-consulting services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines: Selection and Employment of Consultants: Thresholds for Consultants Selection Methods and Prior Review Thresholds for Consultants Selection Methods and Prior Review for Consulting Services Category Prior Short List of National Consultants (US$ million) 2 Review Consulting Engineering and (US$ Services Construction Supervision millions) Consultants (Firms) ≥4 ≤ 0.3 ≤ 0.3 Individual Consultants ≥ 0.5 NA. NA. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines: Selection and Employment of Consultants. 3. Terms of Reference (TOR) for all consultancy contracts as well as all single source selections, irrespective of the contract value, will be subject to prior review. 4. Any Other Special Selection Arrangements: N/A 5. Consultancy Assignments with Selection Methods and Time Procurement of Consulting Services Summary 1 2 3 4 5 6 Ref. No. Description of Estimated Package Review Comments Assignment Cost s by Bank (Prior / US$ million Post) Summary of NIL NIL NIL NIL contracts through CQS 3 Summary of 0.2 million 26 Post Individual Consultants (mostly contracts through peer reviewers) IC 4 PROCUREMENT Eastern Africa : Agricultural Productivity Program for Southern Africa - Angola & Lesotho PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2019-05-20 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164486 GPN Date: Project Name: Agricultural Productivity Program for Southern Africa - Angola & Lesotho Loan / Credit No: IBRD / 89170, IDA / D4150 SADC-CCARDESA Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BW-CCARDESA-99779-GO- RFQ / Office equipment: Project management, Request for Single Stage - One (computers, printers, IDA / D4150 monitoring and evaluation, Post Open - National 20,000.00 15,154.82 Signed 2019-06-10 2019-07-12 2019-11-21 2019-08-12 Quotations Envelope photocopiers, laptops, and regional coordination Phones). Project management, BW-CCARDESA-99782-GO- Request for Single Stage - One IDA / D4150 monitoring and evaluation, Post Open - National 20,000.00 15,730.64 Signed 2019-07-21 2019-09-15 2020-04-17 2020-03-13 RFQ / Finance Software. Quotations Envelope and regional coordination BW-CCARDESA-99780-GO- Project management, Request for Single Stage - One RFQ / Office furniture for IDA / D4150 monitoring and evaluation, Post Open - National 12,000.00 20,322.25 Signed 2019-06-29 2019-08-24 2019-11-26 2020-02-20 Quotations Envelope additional PIU staff. and regional coordination Strengthening the BW-CCARDESA-99776-GO- Institutional and Enabling Request for Single Stage - One IBRD / 89170 Post Open - National 2,000.00 0.00 Canceled 2019-07-03 2019-08-28 2020-02-24 RFQ / Promotional material. Environment for Technology Quotations Envelope Adoption Strengthening the BW-CCARDESA-99769-GO- Institutional and Enabling Request for Single Stage - One IBRD / 89170 Post Open - National 500.00 0.00 Canceled 2019-07-13 2019-09-07 2020-03-05 RFQ / Visibility Consumables. Environment for Technology Quotations Envelope Adoption NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project management, BW-CCARDESA-100437-NC- Single Stage - One IBRD / 89170 monitoring and evaluation, Post Request for Bids Open - National 167,200.00 0.00 Canceled 2019-06-10 2019-06-15 2019-06-30 2019-07-14 2019-07-24 2021-01-22 RFB / Air tickets Envelope and regional coordination BW-CCARDESA-99542-NC- Strengthening the RFQ / Consultant to design, Institutional and Enabling Request for Single Stage - One IBRD / 89170 Post Open - National 5,000.00 0.00 Canceled 2019-09-07 2019-11-02 2020-04-30 print and bind knowledge Environment for Technology Quotations Envelope products (visibility material). Adoption BW-CCARDESA-100452-NC- Technology Generation and DIR / Interpretation IBRD / 89170 Post Direct Selection Direct 10,000.00 0.00 Canceled 2019-06-10 2019-06-17 2019-06-27 2019-12-31 Dissemination equipment hire. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project management, BW-CCARDESA-100419-CS- Least Cost IDA / D4150 monitoring and evaluation, Post Open - National 8,500.00 0.00 Canceled 2019-07-29 2019-09-22 2019-08-19 2019-10-02 2019-10-30 2019-11-29 2020-01-03 2020-02-07 2020-08-05 QCBS / Internal Auditing. Selection and regional coordination Project management, BW-CCARDESA-100416-CS- Least Cost IDA / D4150 monitoring and evaluation, Post Open - National 15,000.00 0.00 Canceled 2019-10-01 2019-10-09 2019-10-22 2019-12-05 2020-01-02 2020-02-01 2020-03-07 2020-04-11 2020-10-08 QCBS / External Auditing. Selection and regional coordination Strengthening the BW-CCARDESA-100487-CS- Consultant Institutional and Enabling QCBS / Consultancy services IDA / D4150 Post Qualification Open - National 35,000.00 0.00 Canceled 2019-06-17 2019-07-08 2019-08-21 2019-09-20 2019-10-25 2020-04-22 Environment for Technology for English Language training. Selection Adoption BW-CCARDESA-100483-CS- Strengthening the Consultant QCBS / Consultancy services Institutional and Enabling IDA / D4150 Post Qualification Open - International 30,000.00 0.00 Canceled 2019-06-17 2019-07-08 2019-08-21 2019-09-20 2019-10-25 2020-04-22 for Portuguese Language Environment for Technology Selection training. Adoption BW-CCARDESA-178921-CS- QCBS / The consultancy to undertake an assessment of Technology Generation and Quality And Cost- IDA / D4150 Post Open - International 500,000.00 499,969.00 Signed 2020-07-30 2020-07-30 2020-08-20 2020-08-03 2020-10-03 2020-09-14 2020-10-31 2020-11-13 2020-11-30 2020-11-23 2021-01-04 2021-01-27 2021-02-08 2021-02-16 2022-02-08 the extent of digitalization of Dissemination Based Selection AR4D technologies in the SADC region. BW-CCARDESA-202555-CS- Project management, LCS / The Firm to undertake Least Cost Under IDA / D4150 monitoring and evaluation, Post Open - National 45,000.00 0.00 2020-11-04 2020-11-02 2020-11-25 2021-01-08 2021-02-05 2021-03-07 2021-04-11 2021-05-16 2021-11-12 external audit function for Selection Implementation and regional coordination CCARDESA Page 1 BW-CCARDESA-227496-CS- Project management, LCS / Engagement of the Firm Least Cost Under IDA / D4150 monitoring and evaluation, Post Open - National 25,000.00 0.00 2021-04-01 2021-04-01 2021-04-22 2021-06-05 2019-11-08 2021-07-03 2019-11-22 2021-08-02 2019-11-29 2021-09-06 2021-10-11 2022-04-09 to Provide Internal Audit Selection Implementation and regional coordination Services to CCARDESA INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BW-CCARDESA-99473-CS- Strengthening the INDV / Independent Reviewer Individual Institutional and Enabling #1 to strengthen technical IBRD / 89170 Post Consultant Open 1,600.00 0.00 Canceled 2019-08-12 2019-09-19 2019-09-29 2019-10-27 2020-10-26 Environment for Technology backstopping in the Selection Adoption implementing countries. Strengthening the BW-CCARDESA-99499-CS- Individual Institutional and Enabling INDV / Scoping studies IDA / D4150 Post Consultant Open 8,000.00 0.00 Canceled 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-11-17 Environment for Technology Consultant #1. Selection Adoption BW-CCARDESA-99481-CS- Strengthening the INDV / Independent Reviewer Individual Institutional and Enabling #3 to strengthen technical IBRD / 89170 Post Consultant Open 1,600.00 0.00 Canceled 2019-06-14 2019-07-22 2019-08-01 2019-09-05 2020-09-04 Environment for Technology backstopping in the Selection Adoption implementing countries. BW-CCARDESA-99479-CS- Strengthening the INDV / Independent Reviewer Individual Institutional and Enabling #2 to strengthen technical IBRD / 89170 Post Consultant Open 1,600.00 0.00 Canceled 2019-06-21 2019-07-29 2019-08-08 2019-09-05 2020-09-04 Environment for Technology backstopping in the Selection Adoption implementing countries. BW-CCARDESA-99567-CS- Project management, Individual INDV / Facilitator for the IDA / D4150 monitoring and evaluation, Post Consultant Open 1,200.00 0.00 Canceled 2019-08-26 2019-10-14 2019-11-04 2019-12-09 2020-07-31 regional seed dialogue for 3 and regional coordination Selection days. Strengthening the BW-CCARDESA-99500-CS- Individual Institutional and Enabling INDV / Scoping Studies IDA / D4150 Post Consultant Open 8,000.00 0.00 Canceled 2019-07-15 2019-09-02 2019-09-23 2019-10-28 2020-10-27 Environment for Technology Consultant #2. Selection Adoption BW-CCARDESA-99517-CS- Strengthening the INDV / Consultant to review Individual Institutional and Enabling RCoLs communication and IBRD / 89170 Post Consultant Open 800.00 0.00 Canceled 2019-08-22 2019-10-10 2019-10-31 2019-12-05 2020-12-04 Environment for Technology technology dissemination Selection Adoption strategies. BW-CCARDESA-98228-CS- Individual INDV / Facilitator fees for Technology Generation and IDA / D4150 Post Consultant Open 4,000.00 2,000.00 Signed 2019-06-17 2019-06-13 2019-07-22 2019-07-03 2019-08-05 2019-07-04 2019-09-09 2019-07-04 2020-09-08 project operationalization Dissemination Selection workshop BW-CCARDESA-99574-CS- Project management, Individual INDV / Facilitator for the M&E IBRD / 89170 monitoring and evaluation, Post Consultant Open 2,000.00 0.00 Canceled 2019-06-24 2019-07-27 2019-08-03 2019-08-17 2021-02-20 training for scientists. and regional coordination Selection BW-CCARDESA-99375-CS- INDV / Consultant #1 for the Individual Technology Generation and regional peer review of R&D IBRD / 89170 Post Consultant Open 4,000.00 0.00 Canceled 2019-07-02 2019-08-20 2019-09-10 2019-10-15 2020-04-12 Dissemination Concept Notes and Proposals Selection over 5 days respectively. BW-CCARDESA-99727-CS- Individual Technology Generation and INDV / Portuguese Interpreter IBRD / 89170 Post Consultant Open 13,600.00 0.00 Canceled 2019-06-24 2019-07-23 2019-08-02 2019-09-06 2020-03-04 Dissemination # 2. Selection BW-CCARDESA-99719-CS- Individual Technology Generation and INDV / Portuguese Interpreter IBRD / 89170 Post Consultant Open 13,600.00 2,997.17 Signed 2019-07-01 2019-06-27 2019-07-30 2019-07-08 2019-08-09 2019-07-09 2019-09-13 2019-07-10 2020-03-11 Dissemination #1. Selection BW-CCARDESA-99534-CS- Strengthening the Individual INDV / Development of Institutional and Enabling IBRD / 89170 Post Consultant Open 1,500.00 0.00 Canceled 2019-06-24 2019-08-12 2019-09-02 2019-10-07 2020-10-06 knowledge products Environment for Technology Selection Consultant #3. Adoption BW-CCARDESA-99532-CS- Strengthening the Individual INDV / Development of Institutional and Enabling IBRD / 89170 Post Consultant Open 1,500.00 0.00 Canceled 2019-06-24 2019-08-12 2019-09-02 2019-10-07 2020-10-06 knowledge products Environment for Technology Selection Consultant #2. Adoption BW-CCARDESA-99389-CS- INDV / Consultant #4 for the Individual Technology Generation and regional peer review of R&D IBRD / 89170 Post Consultant Open 4,000.00 0.00 Canceled 2019-07-02 2019-08-20 2019-09-10 2019-10-15 2020-04-12 Dissemination Project Concept Notes and Selection Proposals, 5 days respectively. BW-CCARDESA-99391-CS- INDV / Consultant #6 for the Individual Technology Generation and regional peer review of R&D IBRD / 89170 Post Consultant Open 4,000.00 0.00 Canceled 2019-06-17 2019-07-25 2019-08-04 2019-09-08 2020-09-07 Dissemination Project Concept Notes and Selection Proposals, 5 days respectively. BW-CCARDESA-99390-CS- INDV / Consultant #5 for Individual Technology Generation and regional peer review of R&D IBRD / 89170 Post Consultant Open 4,000.00 0.00 Canceled 2019-07-02 2019-08-20 2019-09-10 2019-10-15 2020-04-12 Dissemination Project Concept Notes and Selection Proposals, 5 days respectively. BW-CCARDESA-99381-CS- INDV / Consultant #2 for Individual Technology Generation and regional peer review of R&D IBRD / 89170 Post Consultant Open 4,000.00 0.00 Canceled 2019-07-02 2019-08-20 2019-09-10 2019-10-15 2020-04-12 Dissemination Project Concept Notes and Selection Proposals, 5 days respectively. Page 2 Strengthening the BW-CCARDESA-99503-CS- Individual Institutional and Enabling INDV / Scoping Studies IDA / D4150 Post Consultant Open 8,000.00 0.00 Canceled 2019-07-08 2019-08-26 2019-09-16 2019-10-21 2020-10-20 Environment for Technology Consultant #4. Selection Adoption Strengthening the BW-CCARDESA-99502-CS- Individual Institutional and Enabling INDV / Scoping Studies IDA / D4150 Post Consultant Open 8,000.00 0.00 Canceled 2019-08-08 2019-09-26 2019-10-17 2019-11-21 2020-11-20 Environment for Technology Consultant #3. Selection Adoption BW-CCARDESA-99530-CS- Strengthening the Individual INDV / Development of Institutional and Enabling IBRD / 89170 Post Consultant Open 1,500.00 0.00 Canceled 2019-07-08 2019-08-26 2019-09-16 2019-10-21 2020-10-20 knowledge products Environment for Technology Selection Consultant #1. Adoption BW-CCARDESA-99386-CS- INDV / Consultant #3 for the Individual Technology Generation and regional peer review for R&D IBRD / 89170 Post Consultant Open 4,000.00 0.00 Canceled 2019-07-02 2019-08-20 2019-09-10 2019-10-15 2020-04-12 Dissemination Project Concept Notes and Selection Proposal, 5 days respectively. BW-CCARDESA-117893-CS- Project management, Individual INDV / FINANCE OFFICER - IBRD / 89170 monitoring and evaluation, Post Consultant Open 298,319.00 298,319.00 Signed 2019-06-04 2019-06-12 2019-07-15 2019-10-07 2019-07-20 2019-10-18 2019-07-30 2019-10-21 2023-07-29 PIU staff - 4 years contract and regional coordination Selection BW-CCARDESA-117903-CS- Project management, Individual INDV / Procurement Officer - IBRD / 89170 monitoring and evaluation, Post Consultant Open 298,319.00 298,319.00 Signed 2019-06-04 2019-06-27 2019-07-15 2019-10-14 2019-07-20 2019-11-15 2019-07-30 2019-11-22 2023-07-29 PIU staff - 4 year contract and regional coordination Selection BW-CCARDESA-117905-CS- Project management, Individual INDV / Programme Officer - IBRD / 89170 monitoring and evaluation, Post Consultant Open 298,319.00 298,319.00 Signed 2019-06-04 2019-06-12 2019-07-15 2019-08-26 2019-07-20 2019-10-11 2019-07-30 2019-10-28 2023-07-29 PIU Staff - 4 year contract and regional coordination Selection BW-CCARDESA-117906-CS- Project management, Individual INDV / Monitoring and IDA / D4150 monitoring and evaluation, Post Consultant Open 334,131.00 334,131.00 Terminated 2019-06-04 2019-06-12 2019-07-15 2019-08-26 2019-07-20 2019-08-30 2019-07-30 2019-09-09 2023-07-29 Evaluation Officer - 4 year and regional coordination Selection contract BW-CCARDESA-117908-CS- INDV / Information Individual Communication and Technology Generation and IBRD / 89170 Post Consultant Open 298,319.00 298,319.00 Signed 2019-06-04 2019-06-12 2019-06-26 2019-08-26 2019-07-01 2019-09-27 2019-07-11 2019-10-07 2023-07-10 Knowledge Management Dissemination Selection (ICKM) Officer - PIU staff - 4 year contract BW-CCARDESA-217590-CS- Project management, Individual Under INDV / Employment Contract IDA / D4150 monitoring and evaluation, Post Consultant Open 356,406.00 0.00 2021-02-03 2021-02-04 2021-03-24 2021-04-14 2021-05-19 2021-11-15 Implementation for M& E Officer and regional coordination Selection BW-CCARDESA-217598-CS- Project management, Individual Under INDV / Employment Contract IDA / D4150 monitoring and evaluation, Post Consultant Open 445,249.00 0.00 2021-02-03 2021-02-04 2021-03-24 2021-04-14 2021-05-19 2021-11-15 Implementation for Project Coordinator and regional coordination Selection BW-CCARDESA-217615-CS- Project management, CDS / Consultancy for IDA / D4150 monitoring and evaluation, Post Direct Selection Direct 15,000.00 14,981.93 Signed 2021-02-08 2021-02-05 2021-02-18 2021-02-08 2021-04-24 2021-06-07 2021-10-21 facilitating regional write shop and regional coordination and endorsement workshop. BW-CCARDESA-234922-CS- INDV / Engagement of M&E Project management, Individual Under consultant to Support the IDA / D4150 monitoring and evaluation, Post Consultant Open 12,600.00 0.00 2021-05-19 2021-05-17 2021-07-07 2021-07-28 2021-09-01 2022-02-28 Implementation implementation of APPSA and regional coordination Selection Regional Activities Page 3 PROCUREMENT PLAN Project information: Sint Maarten Emergency Income Support and Training (P167368) Project Implementation agency: IRC Date of the Procurement Plan: 09/11/2018 Period covered by this Procurement Plan: August 2018 to April 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is applicable for those contracts identified in the Procurement Plan tables]; Works: [is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. PROCUREMENT St Maarten : Emergency Income Support and Training Project PLAN General Information Country: St Maarten Bank’s Approval Date of the Original Procurement Plan: 2019-07-10 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167368 GPN Date: Project Name: Emergency Income Support and Training Project Loan / Credit No: TF / A8265 National Recovery Program Bureau Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2. Strengthening SX-NRPB-126056-GO-RFQ / institutional capacity to Request for Single Stage - One Tablets to provide to TF / A8265 Post Limited 7,500.00 7,500.06 Signed 2019-08-07 2019-07-10 2019-10-02 2019-08-28 2020-03-30 enhance the social protection Quotations Envelope surveyors system Pending SX-NRPB-126057-NC-DIR / Component 3. Project TF / A8265 Post Direct Selection Direct 6,000.00 0.00 Implementati 2019-08-05 2019-08-10 2019-09-14 2020-03-12 IT equipment for staff Management on Pending SX-NRPB-232801-GO-RFQ / Component 3. Project Request for Single Stage - One TF / A8265 Post Open - National 38,000.00 0.00 Implementati 2021-05-21 2021-07-16 2022-01-12 Branding & Marketing Items Management Quotations Envelope on SX-NRPB-232454-GO-RFQ / Component 2. Strengthening Pending Procurement of Equipment institutional capacity to Request for Single Stage - One TF / A8265 Post Open - National 50,000.00 0.00 Implementati 2021-05-21 2021-07-16 2022-01-12 and Furniture for Social enhance the social protection Quotations Envelope on Registry Unit system NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2. Strengthening SX-NRPB-121880-NC-RFP / institutional capacity to Single Stage - One TF / A8265 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2019-07-25 2019-08-13 2019-07-30 2019-08-13 2019-09-10 2019-10-10 2019-11-14 2020-05-12 HR services Household Survey enhance the social protection Envelope system Component 2. Strengthening SX-NRPB-232806-NC-RFQ / Pending institutional capacity to Request for Single Stage - One Mobile data Services to TF / A8265 Post Limited 10,500.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 enhance the social protection Quotations Envelope Support Data collection on system SX-NRPB-232807-NC-RFQ / Component 2. Strengthening Pending Catering services to support institutional capacity to Request for Single Stage - One TF / A8265 Post Limited 6,000.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 training for data potential enhance the social protection Quotations Envelope on collectors system Component 2. Strengthening SX-NRPB-232810-NC-RFQ / Pending institutional capacity to Request for Single Stage - One Hand Sanitizers and masks for TF / A8265 Post Limited 30,000.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 enhance the social protection Quotations Envelope data collectors on system CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-121879-CS-CQS / Component 2. Strengthening Consultant Marketing and institutional capacity to TF / A8265 Post Qualification Open - National 30,000.00 0.00 Canceled 2019-08-12 2019-08-07 2019-09-02 2019-10-16 2019-11-15 2019-12-20 2020-06-17 Communication for enhance the social protection Selection Household Survey system SX-NRPB-126429-CS-CQS / Component 2. Strengthening Marketing and Consultant institutional capacity to Communication strategy for TF / A8265 Post Qualification Limited 50,000.00 0.00 Canceled 2019-08-07 2019-08-07 2019-08-21 2019-08-07 2019-09-20 2019-10-25 2020-04-22 enhance the social protection integrated social registry Selection system system SX-NRPB-232785-CS-QCBS / Component 2. Strengthening Labor market Analysis/Study institutional capacity to Quality And Cost- Pending TF / A8265 Post Open - International 874,572.00 0.00 2021-05-05 2021-05-26 2021-07-09 2021-08-06 2021-09-05 2021-10-10 2021-11-14 2022-11-14 of unemployment benefit for enhance the social protection Based Selection Implementation NESC support system INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2. Strengthening Individual SX-NRPB-121871-CS-INDV / institutional capacity to Under TF / A8265 Post Consultant Open 160,000.00 0.00 2019-08-04 2021-05-13 2019-09-22 2019-10-13 2019-11-17 2020-05-15 Data Analyst enhance the social protection Implementation Selection system Page 1 Component 2. Strengthening Individual SX-NRPB-121873-CS-INDV / institutional capacity to TF / A8265 Post Consultant Open 160,000.00 0.00 Canceled 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 Social Officer enhance the social protection Selection system Component 2. Strengthening Individual SX-NRPB-121876-CS-INDV / institutional capacity to Pending TF / A8265 Post Consultant Open 160,000.00 0.00 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 Operations Manager enhance the social protection Implementation Selection system Component 2. Strengthening SX-NRPB-121878-CS-CDS / institutional capacity to Design of Integrated Social TF / A8265 Prior Direct Selection Direct 400,000.00 0.00 Canceled 2019-08-12 2019-08-22 2019-10-26 2020-04-23 enhance the social protection Registry Software system SX-NRPB-126055-CS-CDS / Component 3. Project DLI verification Training TF / A8265 Post Direct Selection Direct 50,000.00 118,382.00 Signed 2019-08-05 2019-08-03 2019-08-05 2019-08-03 2019-08-26 2019-09-06 2020-02-22 Management Program Component 2. Strengthening SX-NRPB-135375-CS-CDS / institutional capacity to Under Design and build Integrated TF / A8265 Post Direct Selection Direct 1,500,000.00 0.00 2019-09-30 2019-10-09 2019-10-10 2019-10-30 2019-12-14 2020-06-11 enhance the social protection Implementation Social Registry System system Component 2. Strengthening Individual SX-NRPB-147263-CS-INDV / institutional capacity to TF / A8265 Post Consultant Open 50,000.00 0.00 Canceled 2019-11-26 2019-12-02 2020-01-14 2020-02-04 2020-03-10 2020-09-06 Communication Strategy HLS enhance the social protection Selection system SX-NRPB-147265-CS-CDS / Component 3. Project TF / A8265 Post Direct Selection Direct 150,000.00 127,705.56 Signed 2019-11-29 2019-11-26 2019-12-09 2019-12-17 2020-02-12 2020-06-01 2020-08-10 Process re-engineering Management Component 2. Strengthening Individual SX-NRPB-162131-CS-INDV / institutional capacity to Under TF / A8265 Post Consultant Open 150,000.00 0.00 2020-02-28 2020-04-17 2020-05-08 2020-06-12 2020-12-09 50 Data Collectors HSL enhance the social protection Implementation Selection system SX-NRPB-177372-CS-CDS / Component 3. Project TF / A8265 Prior Direct Selection Direct 5,000.00 4,500.00 Signed 2020-06-02 2020-06-09 2020-06-12 2020-06-01 2020-08-16 2020-06-16 2021-02-12 Procurement Consultant Management SX-NRPB-185264-CS-CDS / Component 3. Project TF / A8265 Post Direct Selection Direct 50,000.00 44,400.00 Signed 2020-07-23 2020-04-01 2020-08-02 2020-07-31 2020-10-06 2020-08-17 2021-04-04 Communications Specialist Management SX-NRPB-192304-CS-CDS / Component 3. Project Under TF / A8265 Prior Direct Selection Direct 5,000.00 0.00 2020-09-10 2020-09-14 2020-09-20 2020-11-24 2021-05-23 Procurement Consultant 2 Management Implementation SX-NRPB-202553-CS-CDS / Component 3. Project TF / A8265 Post Direct Selection Direct 100,000.00 71,040.00 Signed 2020-11-02 2020-10-27 2020-11-12 2020-11-01 2021-01-16 2021-04-24 2021-07-15 Project Coordinator remote Management Component 2. Strengthening Individual SX-NRPB-232230-CS-INDV / institutional capacity to Pending TF / A8265 Post Consultant Open 50,000.00 0.00 2021-05-03 2021-06-21 2021-07-12 2021-08-16 2022-02-12 Social Officer 1 enhance the social protection Implementation Selection system Component 2. Strengthening Individual SX-NRPB-232453-CS-INDV / institutional capacity to Pending TF / A8265 Post Consultant Open 50,000.00 0.00 2021-05-03 2021-06-21 2021-07-12 2021-08-16 2022-02-12 Social Officer 2 enhance the social protection Implementation Selection system Component 2. Strengthening SX-NRPB-226035-CS-INDV / Individual institutional capacity to Communications Specialist: TF / A8265 Post Consultant Open 9,977.00 0.00 Canceled 2021-03-25 2021-04-26 2021-05-13 2021-06-03 2021-07-08 2022-01-04 enhance the social protection Erika Fortuno Selection system Individual SX-NRPB-232797-CS-INDV / Component 3. Project Pending TF / A8265 Post Consultant Open 90,000.00 0.00 2021-05-16 2021-07-04 2021-07-25 2021-08-29 2022-02-25 Project Assistant Management Implementation Selection Component 2. Strengthening SX-NRPB-232229-CS-CDS / institutional capacity to Under Process Re-Engineering TF / A8265 Post Direct Selection Direct 194,706.00 0.00 2021-04-30 2021-06-10 2021-05-10 2021-07-14 2022-01-10 enhance the social protection Implementation Consultants system Component 2. Strengthening SX-NRPB-234388-CS-INDV / Individual institutional capacity to Communication Specialist: TF / A8265 Post Consultant Open 18,010.00 0.00 Canceled 2021-05-16 2021-06-08 2021-07-04 2021-07-25 2021-08-29 2022-02-25 enhance the social protection Erika Fortuno Selection system Component 2. Strengthening Individual SX-NRPB-234937-CS-INDV / institutional capacity to Under TF / A8265 Post Consultant 168,000.00 0.00 2021-05-19 2021-05-24 2021-07-07 2021-07-28 2021-09-01 2022-02-28 Data Collectors enhance the social protection Implementation Selection system Component 2. Strengthening SX-NRPB-239257-CS-CDS / institutional capacity to Under Communications Specialist: TF / A8265 Post Direct Selection Direct 20,000.00 0.00 2021-06-14 2021-06-08 2021-06-24 2021-08-28 2022-02-24 enhance the social protection Implementation Erika Fortuno system Page 2 PROCUREMENT PLAN - Textual Part Project information: Sint Maarten Emergency Recovery Project (P167339) Project Implementation Agency: NRPB Date of the Procurement Plan: April 29, 2021 Period covered by this Procurement Plan: From April 2021 to March 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: Shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the National Procurement Legislation such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The Bank’s Anti- Corruption Guidelines and Sanctions Framework shall be incorporated into the national bidding documents by adding a page entitled “Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework”. 2. Contracts with an appropriate allocation of responsibilities, risks, and liabilities between the Borrower and the contractors/suppliers/consultants. 3. Rights for the Bank to review procurement documentation and activities. In accordance with the Procurement Regulations, each bidding document and contract shall include provisions stating the Bank's policy to sanction firms or individuals, found to have engaged in fraud and/or corruption as defined in the Procurement Regulations. In accordance with the Procurement Regulations, each bidding document and contract financed out of the proceeds of the Financing Agreement shall provide that bidders, suppliers, contractors and their subcontractors, agents, personnel, consultants, service providers, or suppliers shall permit the Bank to inspect all accounts, records and other documents relating to the bid submission and performance of the contract and to have said accounts and records audited by auditors appointed by the Bank. Acts intended to materially impede the exercise of the Bank's inspection and audit rights provided for in the Procurement Regulations constitute an obstructive practice as defined in the Regulations. 4. No bids shall be rejected solely because they fall below or exceed the estimated cost. All bids (including in the case when less than two bids are received) shall not be rejected, the procurement process shall not be cancelled, and new bids shall not be solicited without the Bank's prior written concurrence. The Bidding Documents template to be used under “national open competitive procurement arrangements” are subject to prior written concurrence by the Bank. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second-hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: not applicable Works: not applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. Procurement in Situations of Urgent Need of Assistance or Capacity Constraints. PROCUREMENT PLAN Goods Notification Activity Draft Signed Review Procurement Evaluation of Intention Reference No. / In-Process Component Contract Contract Type Category Options of Award Description: Planned Planned Planned Restoring a community SX-NRPB- learning and 205571-GO-DIR / No cultural Post Goods Direct 2021/01/30 2021/02/13 2021/03/06 ICT Equipment environment, Project Management Consulting Services Draft Signed Negotiated Activity Contract Market Contract Reference No. In-Process Component Review Type Category Approach / Description: Planned Planned SX-NRPB- Restoring a 205590-CS- community CDS / ESS8 Consultant No learning and Post Direct 2021/03/26 2021/04/30 Cultural Services cultural Heritage environment Consultants SX-NRPB- 205594-CS- Rebuilding safe Consultant CDS / School No Prior Direct 2021/04/10 2021/05/15 schools Services and Library designs Individual Consultants Terms of Expression Signed Activity Reference of Interest Contract Reference In- Review Market Component Category No. / Process Type Approach Description: Planned Planned Planned SX-NRPB- 205589-CS- INDV / Consultant No Project Management Post Open 2021/03/04 2021/03/25 2021/06/24 MECYS Services Project Manager SX-NRPB- 205575-CS- Restoring a community INDV / learning and cultural Consultant Technical No Post Open 2021/01/04 2021/01/25 2021/04/26 environment,Project Services Assistant Management Project Engineer SX-NRPB- Restoring a community 205576-CS- learning and cultural Consultant INDV / No Post Open 2021/02/04 2021/02/25 2021/05/27 environment,Project Services Safeguards Management Specialist SX-NRPB- 205592-CS- Restoring a community INDV / Needs Consultant No learning and cultural Post Open 2021/02/04 2021/02/25 2021/05/27 Assessment Services environment for Inclusive Education SX-NRPB- 205415-CS- INDV / FRLP: Local Consultant to Restoring a community work on learning and cultural strategy and Consultant No environment,Strengthening Post Open 2021/01/04 2021/01/18 2021/04/19 Framework Services the Ministry’s Management for SXM Information System Cultural Heritage and other Learning Services SX-NRPB- 205561-CS- Consultant INDV / No Project Management Post Open 2021/01/04 2021/01/25 2021/04/26 Services Procurement Specialist SX-NRPB- 205593-CS- Strengthening the INDV / Consultant No Ministry’s Management Post Open 2021/03/01 2021/03/22 2021/06/21 Development Services Information System MIS framework PROCUREMENT St Maarten : Sint Maarten Emergency Recovery Project I PLAN General Information Country: St Maarten Bank’s Approval Date of the Original Procurement Plan: 2018-09-05 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167339 GPN Date: Project Name: Sint Maarten Emergency Recovery Project I Loan / Credit No: TF / A8079 National Recovery Program Bureau Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SX-NRPB-156576-CW-RFB / Housing Repair and Public Single Stage - One 2020-12- Public Building Repairs: TF / A8079 Buildings Repair and Prior Request for Bids Open - International 5,000,000.00 0.00 Canceled 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 Envelope 19 Education Facilities Reconstruction Housing Repair and Public SX-NRPB-165115-CW-RFB / Single Stage - One 2,418,911.5 2021-01- TF / A8079 Buildings Repair and Post Request for Bids Limited 1,000,000.00 Signed 2020-03-25 2020-05-14 2020-03-30 2020-04-16 2020-05-11 2020-05-07 2020-06-10 2020-06-01 2020-07-15 2020-07-06 Rehabilitation of Shelters Envelope 4 11 Reconstruction Housing Repair and Public SX-NRPB-181992-CW-RFB / Single Stage - One 1,946,600.0 2021-05- TF / A8079 Buildings Repair and Prior Request for Bids Limited 1,500,000.00 Signed 2020-07-14 2020-08-10 2020-07-19 2020-11-03 2020-08-30 2020-09-11 2020-09-29 2020-11-12 2020-11-03 2021-01-18 Priority School Repairs Envelope 0 02 Reconstruction SX-NRPB-183349-CW-RFQ / Housing Repair and Public Request for Single Stage - One 2021-03- SMHDF roof repairs, for TF / A8079 Buildings Repair and Post Limited 236,367.00 236,367.00 Signed 2020-07-13 2020-07-07 2020-09-07 2020-07-07 Quotations Envelope 06 retroactive finance Reconstruction SX-NRPB-202289-CW-RFB / Housing Repair and Public Under Single Stage - One 2021-08- Batch 2: Schools and F&A TF / A8079 Buildings Repair and Post Request for Bids Open - International 4,750,000.00 0.00 Implementat 2020-11-09 2021-04-27 2020-11-14 2021-05-10 2020-12-26 2021-01-25 2021-03-01 Envelope 28 Building Repairs Reconstruction ion Housing Repair and Public Under SX-NRPB-202300-CW-RFB / Single Stage - One 2021-09- TF / A8079 Buildings Repair and Post Request for Bids Open - International 6,500,000.00 0.00 Implementat 2020-11-16 2021-04-01 2020-11-21 2021-04-08 2021-01-02 2021-05-24 2021-02-01 2021-03-08 SMHDF Repairs Phase 2 Envelope 04 Reconstruction ion Housing Repair and Public Pending SX-NRPB-202314-CW-RFB / Single Stage - One 2021-10- TF / A8079 Buildings Repair and Post Request for Bids Open - International 5,000,000.00 0.00 Implementat 2021-01-11 2021-01-16 2021-02-27 2021-03-29 2021-05-03 Batch 3: School Repairs Envelope 30 Reconstruction ion Emergency measures for the Pending SX-NRPB-202332-CW-RFB / recovery of disaster first Single Stage - One 2021-12- TF / A8079 Post Request for Bids Open - International 5,000,000.00 0.00 Implementat 2021-03-01 2021-03-06 2021-04-17 2021-05-17 2021-06-21 GEBE Trenching Batch 1 responders and preparedness Envelope 18 ion facilities Emergency measures for the Pending SX-NRPB-202333-CW-RFB / recovery of disaster first Single Stage - One 2022-08- TF / A8079 Post Request for Bids Open - International 5,000,000.00 0.00 Implementat 2021-11-01 2021-11-06 2021-12-18 2022-01-17 2022-02-21 GEBE Trenching Batch 2 responders and preparedness Envelope 20 ion facilities Housing Repair and Public Pending SX-NRPB-202315-CW-RFB / Single Stage - One 2022-02- TF / A8079 Buildings Repair and Post Request for Bids Open - International 4,500,000.00 0.00 Implementat 2021-05-01 2021-05-06 2021-06-17 2021-07-17 2021-08-21 Expansion of the EOC Building Envelope 17 Reconstruction ion SX-NRPB-208747-CW-DIR / Housing Repair and Public 2021-07- Minor Repair Works to Homes: TF / A8079 Buildings Repair and Post Direct Selection Direct 27,772.18 28,065.55 Completed 2020-12-09 2020-12-01 2020-12-14 2020-12-01 2021-01-18 2021-01-06 17 Aluminum System Reconstruction GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Emergency measures for the SX-NRPB-136740-GO-DIR / recovery of disaster first TF / A8079 Prior Direct Selection Direct 2,250,000.00 1,938,933.00 Signed 2019-10-01 2020-06-04 2019-10-01 2020-06-18 2019-11-05 2020-02-26 2020-05-03 Fire Trucks responders and preparedness facilities Emergency measures for the SX-NRPB-143339-GO-DIR / recovery of disaster first TF / A8079 Prior Direct Selection Direct 15,000.00 15,120.00 Signed 2019-10-29 2020-05-27 2019-11-03 2020-06-15 2019-12-08 2020-01-08 2020-06-05 Safety Shoes Fire Department responders and preparedness facilities Emergency measures for the SX-NRPB-157539-GO-DIR / recovery of disaster first TF / A8079 Post Direct Selection Direct 20,000.00 17,690.00 Signed 2020-02-09 2020-02-04 2020-02-14 2020-03-19 2020-03-20 2020-03-27 2020-09-16 Diesel Water Pumps responders and preparedness facilities Emergency measures for the SX-NRPB-160723-GO-DIR / recovery of disaster first TF / A8079 Post Direct Selection Direct 60,000.00 52,355.72 Signed 2020-02-20 2019-12-11 2020-02-25 2020-03-10 2020-03-31 2020-04-14 2020-09-27 Ambulance: Spare Parts responders and preparedness facilities Emergency measures for the SX-NRPB-160730-GO-DIR / recovery of disaster first FD&AD: Additional Radios and TF / A8079 Post Direct Selection Direct 100,000.00 61,381.67 Signed 2020-02-20 2018-06-07 2020-02-25 2020-03-23 2020-03-31 2020-03-23 2020-09-27 responders and preparedness Accessories facilities Emergency measures for the SX-NRPB-165436-GO-DIR / recovery of disaster first TF / A8079 Prior Direct Selection Direct 1,500,000.00 0.00 Canceled 2020-03-19 2020-06-04 2020-03-24 2020-06-18 2020-04-28 2020-10-25 Type II Ambulances responders and preparedness facilities Emergency measures for the SX-NRPB-167830-GO-DIR / recovery of disaster first TF / A8079 Post Direct Selection Direct 100,000.00 100,213.14 Signed 2020-04-06 2020-03-05 2020-04-06 2020-04-06 2020-05-11 2020-04-21 2020-11-07 ProPac Isolation Capsules responders and preparedness facilities Page 1 Emergency measures for the AN-NRPB-76471-GO-RFB / recovery of disaster first Single Stage - One TF / A8079 Prior Request for Bids Open - International 2,385,000.00 1,645,775.00 Signed 2020-05-18 2020-06-18 2020-05-23 2020-09-14 2020-07-04 2020-09-23 2020-08-03 2020-12-10 2020-09-07 2021-02-11 2021-03-06 General Vehicles responders and preparedness Envelope facilities Emergency measures for the Under SX-NRPB-160728-GO-DIR / recovery of disaster first TF / A8079 Post Direct Selection Direct 100,000.00 0.00 Implementati 2020-02-20 2018-09-17 2020-02-25 2021-02-05 2020-03-31 2020-09-27 FD: Spare Parts responders and preparedness on facilities Emergency measures for the SX-NRPB-160720-GO-DIR / recovery of disaster first TF / A8079 Prior Direct Selection Direct 170,000.00 0.00 Canceled 2020-02-20 2020-02-25 2020-03-31 2020-09-27 Submersible Water Pumps responders and preparedness facilities Emergency measures for the Under SX-NRPB-185662-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Post Open - International 320,000.00 0.00 Implementati 2020-08-12 2020-10-07 2021-04-05 Crane Trucks (2) responders and preparedness Quotations Envelope on facilities Emergency measures for the Pending SX-NRPB-202345-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Post Open - National 35,000.00 0.00 Implementati 2020-12-06 2021-01-31 2021-07-30 MDS Goods responders and preparedness Quotations Envelope on facilities Emergency measures for the Under SX-NRPB-202313-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Post Open - International 630,000.00 0.00 Implementati 2020-11-20 2021-03-04 2021-01-15 2021-07-14 Command Vehicles responders and preparedness Quotations Envelope on facilities Emergency measures for the SX-NRPB-202327-GO-RFQ / Pending recovery of disaster first Request for Single Stage - One MDS Automatic Weather TF / A8079 Post Open - International 350,000.00 0.00 Implementati 2021-06-06 2021-08-01 2022-01-28 responders and preparedness Quotations Envelope Stations and Tidal Gauges on facilities Emergency measures for the SX-NRPB-213914-GO-DIR / Under recovery of disaster first Sint Maarten Fire Service TF / A8079 Post Direct Selection Direct 15,400.00 0.00 Implementati 2021-01-15 2021-03-11 2021-01-20 2021-02-05 2021-02-24 2021-08-23 responders and preparedness Repair Parts 2 : Waziri Export on facilities SX-NRPB-213915-GO-DIR / Emergency measures for the Under Sint Maarten Fire Service recovery of disaster first TF / A8079 Post Direct Selection Direct 8,800.00 0.00 Implementati 2021-01-15 2021-03-11 2021-01-20 2021-02-05 2021-02-24 2021-08-23 Repair Parts 3: Saint-Martin responders and preparedness on Cars facilities Emergency measures for the Pending SX-NRPB-216605-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Post Open - International 90,000.00 0.00 Implementati 2021-02-03 2021-03-31 2021-09-27 Thirty Seater Bus (1) responders and preparedness Quotations Envelope on facilities SX-NRPB-218343-GO-DIR / Emergency measures for the Under Sint Maarten Fire Service recovery of disaster first TF / A8079 Post Direct Selection Direct 27,500.00 0.00 Implementati 2021-02-09 2021-03-11 2021-02-14 2021-02-08 2021-03-21 2021-09-17 Repair Parts Package 4: responders and preparedness on Motorworld facilities SX-NRPB-218364-GO-DIR / Emergency measures for the Under Sint Maarten Fire Service recovery of disaster first TF / A8079 Post Direct Selection Direct 3,000.00 0.00 Implementati 2021-02-09 2021-03-11 2021-02-14 2021-02-08 2021-03-21 2021-09-17 Repair Parts package 5: Napa responders and preparedness on Auto Parts SXM facilities Emergency measures for the SX-NRPB-220199-GO-DIR / recovery of disaster first Type II Ambulances: Wheeled TF / A8079 Prior Direct Selection Direct 1,500,000.00 1,146,956.00 Signed 2021-02-18 2021-02-18 2021-02-23 2021-02-18 2021-03-30 2021-02-25 2021-09-26 responders and preparedness Coach/ REV Group facilities Emergency measures for the SX-NRPB-216373-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Post Open - International 215,000.00 0.00 Canceled 2021-02-02 2021-04-12 2021-03-30 2021-09-26 Support Vehicles - Vans responders and preparedness Quotations Envelope facilities SX-NRPB-221791-GO-DIR / Emergency measures for the Pending Computer Tablets and recovery of disaster first TF / A8079 Post Direct Selection Direct 3,000.00 0.00 Implementati 2021-02-27 2021-03-04 2021-04-08 2021-10-05 Protective Cases: Keijzer responders and preparedness on Computer Systems NV facilities Emergency measures for the Under SX-NRPB-239642-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Post Limited 215,000.00 0.00 Implementati 2021-06-22 2021-06-21 2021-08-17 2022-02-13 Vans II responders and preparedness Quotations Envelope on facilities NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-160721-NC-DIR / Housing Repair and Public Under Emergency Mold Assessment TF / A8079 Buildings Repair and Post Direct Selection Direct 150,000.00 0.00 Implementati 2020-02-20 2020-12-08 2020-02-25 2020-03-31 2020-09-27 and Remediation Action Plan Reconstruction on SX-NRPB-232003-NC-DIR / Housing Repair and Public Under Retroactive Lease Agreement: TF / A8079 Buildings Repair and Post Direct Selection Direct 4,200.00 0.00 Implementati 2021-04-30 2021-04-09 2021-05-05 2021-04-09 2021-06-09 2021-12-06 Simpson Bay Community Reconstruction on Center CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-132867-CS-LCS / Institutional Support for Least Cost TF / A8079 Prior Open - National 150,000.00 0.00 Canceled 2019-09-05 2019-09-26 2019-11-09 2019-12-07 2020-01-06 2020-02-10 2020-03-16 2020-09-12 Audit Services NRPB Reconstruction Selection Institutional Support for Least Cost ERP_C_015 / Audit services TF / A8079 Post Open - National 150,000.00 421,998.00 Signed 2019-09-05 2019-02-13 2019-09-26 2019-09-18 2019-11-09 2019-04-25 2019-12-07 2019-07-11 2020-01-06 2019-07-11 2020-02-10 2019-07-11 2020-03-16 2019-09-25 2020-09-12 Reconstruction Selection Page 2 SX-NRPB-160722-CS-LCS / Housing Repair and Public Least Cost Under Works Verification Audit TF / A8079 Buildings Repair and Post Open - National 25,000.00 0.00 2019-11-06 2020-01-30 2019-11-27 2020-01-10 2020-01-16 2020-02-07 2020-03-08 2020-04-12 2020-05-17 2020-11-13 Selection Implementation SMHDF Reconstruction AN-IRC-NRPB-88561-CS- Housing Repair and Public Consultant CQS / SMHDF Technical TF / A8079 Buildings Repair and Post Qualification Open - National 250,000.00 207,300.00 Signed 2020-10-15 2019-01-03 2020-11-05 2020-11-17 2020-12-19 2019-01-24 2021-01-18 2019-09-27 2021-02-22 2019-09-27 2021-08-21 Assessment and Design for Reconstruction Selection Phase 2 AN-IRC-NRPB-109549-CS- Housing Repair and Public Quality And Cost- Under QCBS / Technical Assessment TF / A8079 Buildings Repair and Post Open - National 500,000.00 0.00 2020-11-03 2020-11-24 2021-01-07 2021-02-04 2021-03-06 2021-04-10 2021-05-15 2022-05-15 Based Selection Implementation Single family Home Repairs 2 Reconstruction Emergency measures for the SX-NRPB-202330-CS-CQS / recovery of disaster first Quality And Cost- Pending Emergency Cell Broadcast TF / A8079 Post Open - International 350,000.00 0.00 2020-11-20 2020-12-11 2021-01-24 2021-02-21 2021-03-23 2021-04-27 2021-06-01 2022-06-01 responders and preparedness Based Selection Implementation System facilities AN-NRPB-76431-CS-CQS / Supervision Shelter Repairs Consultant Institutional Support for Main and Recovery Housing TF / A8079 Post Qualification Open - National 100,000.00 0.00 Under Review 2021-05-19 2021-06-09 2021-07-23 2021-08-22 2021-09-26 2022-03-25 Reconstruction Repair and Public Buildings Selection Repair and Reconstruction INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-124802-CS-INDV / Individual PROJECT COORDINATOR– Sint Institutional Support for TF / A8079 Post Consultant Open 180,000.00 267,983.36 Signed 2019-07-25 2019-07-25 2019-09-12 2019-10-18 2019-10-03 2019-11-25 2019-11-07 2020-05-29 2020-05-05 Maarten Digital Government Reconstruction Selection Project SX-NRPB-126135-CS-INDV / Individual Institutional Support for Procurement Assistant TF / A8079 Prior Consultant Open 60,000.00 59,241.98 Signed 2019-08-03 2019-08-07 2019-09-21 2019-11-21 2019-10-12 2020-07-07 2019-11-16 2020-01-16 2020-05-14 Reconstruction Consultant Selection SX-NRPB-126138-CS-INDV / Individual Institutional Support for Under Procurement Specialist TF / A8079 Prior Consultant Open 90,000.00 0.00 2019-08-03 2019-08-07 2019-09-21 2019-10-12 2019-11-16 2020-05-14 Reconstruction Implementation Consultant Selection SX-NRPB-126137-CS-INDV / Individual Portfolio and Accounting Institutional Support for TF / A8079 Post Consultant Open 180,000.00 0.00 Canceled 2019-08-03 2019-08-07 2019-09-21 2019-10-12 2019-11-16 2020-05-14 Officer for Small Enterprise Reconstruction Selection Recovery Project SX-NRPB-126665-CS-CDS / Institutional Support for Interim Financial Management TF / A8079 Post Direct Selection Direct 14,000.00 12,150.00 Signed 2019-08-12 2019-09-01 2019-08-22 2019-08-08 2019-10-26 2019-09-01 2020-04-23 Reconstruction Officer SX-NRPB-127209-CS-CDS / Institutional Support for Under Stakeholder Engagement TF / A8079 Post Direct Selection Direct 45,000.00 0.00 2019-08-14 2019-08-09 2019-08-24 2019-10-28 2020-04-25 Reconstruction Implementation Home Repairs SX-NRPB-128034-CS-INDV / Individual Institutional Support for Junior Communications TF / A8079 Post Consultant Open 80,000.00 43,436.52 Terminated 2019-08-20 2019-08-23 2019-10-08 2019-10-18 2019-10-29 2019-11-12 2019-12-03 2019-11-15 2020-05-31 Reconstruction Consultant Selection SX-NRPB-128036-CS-INDV / Individual Institutional Support for Financial Management TF / A8079 Post Consultant Open 40,000.00 27,000.00 Signed 2019-08-19 2019-08-22 2019-10-07 2019-11-19 2019-10-28 2019-11-26 2019-12-02 2019-11-26 2020-05-30 Reconstruction Assistant Selection Individual SX-NRPB-129158-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 80,000.00 61,699.24 Signed 2019-08-26 2019-08-30 2019-10-14 2019-11-13 2019-11-04 2019-11-18 2019-12-09 2019-11-19 2020-06-06 Executive Assistant Reconstruction Selection SX-NRPB-129299-CS-INDV / Individual Institutional Support for Jr Environmental Safeguards TF / A8079 Post Consultant Open 80,000.00 106,076.17 Signed 2019-08-30 2019-08-30 2019-10-18 2019-11-18 2019-11-08 2020-03-30 2019-12-13 2020-05-29 2020-06-10 Reconstruction Specialist Selection Individual SX-NRPB-134548-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 25,000.00 0.00 Canceled 2019-09-16 2018-12-10 2019-11-04 2019-11-25 2019-12-30 2020-06-27 Communications Specialist Reconstruction Selection Emergency measures for the SX-NRPB-144180-CS-CDS / recovery of disaster first Under Design Fire Department TF / A8079 Post Direct Selection Direct 100,000.00 0.00 2019-11-04 2021-05-03 2019-11-04 2020-01-08 2020-07-06 responders and preparedness Implementation Renovation and Expansion facilities Individual SX-NRPB-146192-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 150,000.00 0.00 Canceled 2019-12-12 2019-12-12 2020-02-14 2020-03-06 2020-04-10 2020-10-07 Contract Manager Reconstruction Selection SX-NRPB-153308-CS-INDV / Individual Institutional Support for Project Manager Education TF / A8079 Post Consultant Open 150,000.00 108,000.00 Signed 2020-01-31 2020-01-24 2020-03-20 2020-06-11 2020-04-10 2020-06-24 2020-05-15 2020-06-24 2020-11-11 Reconstruction Project Selection SX-NRPB-154610-CS-CDS / Institutional Support for Under Mission Project Manager TF / A8079 Post Direct Selection Direct 8,000.00 0.00 2020-01-20 2020-01-21 2020-01-20 2019-10-18 2020-01-27 2020-02-17 Reconstruction Implementation Digital Government SX-NRPB-155761-CS-INDV / Individual Institutional Support for Project Manager Enterprise TF / A8079 Post Consultant Open 150,000.00 0.00 Canceled 2020-01-24 2020-03-13 2020-04-03 2020-05-08 2020-11-04 Reconstruction Recovery Project Selection SX-NRPB-156570-CS-CDS / Institutional Support for Pending Procurement Consultant TF / A8079 Post Direct Selection Direct 320,000.00 0.00 2020-01-29 2020-01-29 2020-05-03 2020-10-30 Reconstruction Implementation Services SX-NRPB-146438-CS-INDV / Individual Institutional Support for Procurement Specialist TF / A8079 Prior Consultant Open 150,000.00 0.00 Canceled 2019-11-20 2020-01-08 2020-01-29 2020-03-04 2020-08-31 Reconstruction Consultant 2 Selection Page 3 SX-NRPB-156572-CS-CDS / Project Manager ERP-1 This is a continuation of the Institutional Support for Pending TF / A8079 Post Direct Selection Direct 185,000.00 0.00 2020-01-29 2020-02-08 2020-04-13 2020-10-10 current contract. This contract Reconstruction Implementation will go into effect on April 1 - March 31 2021. SX-NRPB-146440-CS-INDV / Individual Institutional Support for Activity Manager School TF / A8079 Post Consultant Limited 50,000.00 57,975.00 Signed 2019-11-22 2019-11-27 2019-11-27 2020-01-20 2020-02-07 2020-03-09 2020-03-13 2020-03-09 2020-09-09 Reconstruction Repairs Selection SX-NRPB-159532-CS-CDS / Institutional Support for TF / A8079 Prior Direct Selection Direct 200,000.00 49,262.46 Signed 2020-02-13 2021-02-02 2020-02-13 2020-02-13 2020-04-17 2020-02-12 2020-10-14 NRPB Legal Services Reconstruction SX-NRPB-161524-CS-CDS / Institutional Support for Pending TF / A8079 Post Direct Selection Direct 8,000.00 0.00 2020-02-26 2020-03-07 2020-05-11 2020-11-07 Airport Benchmark Study Reconstruction Implementation SX-NRPB-165435-CS-CDS / Institutional Support for Under TF / A8079 Post Direct Selection Direct 225,000.00 0.00 2020-03-19 2019-07-09 2020-03-29 2020-06-02 2020-11-29 Engineer Reconstruction Implementation SX-NRPB-166957-CS-CDS / Institutional Support for Project Coordinator Digital TF / A8079 Post Direct Selection Direct 16,000.00 0.00 Under Review 2020-03-30 2019-12-01 2020-04-09 2020-06-13 2020-12-10 Reconstruction Government INTERIM SX-NRPB-168099-CS-CDS / Institutional Support for TF / A8079 Post Direct Selection Direct 150,000.00 45,000.00 Signed 2020-04-08 2020-07-31 2020-04-18 2020-04-07 2020-06-22 2020-08-13 2020-12-19 Social Safeguards Specialist Reconstruction SX-NRPB-168800-CS-CDS / Institutional Support for Under Design Rehabilitation of TF / A8079 Post Direct Selection Direct 120,000.00 0.00 2020-04-15 2020-06-12 2020-04-25 2020-06-29 2020-12-26 Reconstruction Implementation Shelters Individual SX-NRPB-173096-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 60,000.00 7,824.54 Signed 2020-05-11 2019-10-01 2020-06-29 2020-05-15 2020-07-20 2020-06-19 2020-08-24 2020-06-19 2021-02-20 Jr Communication Officer 2 Reconstruction Selection SX-NRPB-167363-CS-CDS / Institutional Support for TF / A8079 Prior Direct Selection Direct 30,000.00 63,000.00 Signed 2020-04-02 2021-01-12 2020-04-12 2020-05-08 2020-06-16 2020-05-07 2020-12-13 MP: Procurement Consultant Reconstruction SX-NRPB-167376-CS-CDS / Institutional Support for TF / A8079 Prior Direct Selection Direct 30,000.00 223,500.00 Signed 2020-04-02 2020-07-22 2020-04-12 2020-04-02 2020-06-16 2020-04-23 2020-12-13 SI: Procurement Consultant Reconstruction SX-NRPB-186632-CS-CDS / Housing Repair and Public Twenty Schools and F&A TF / A8079 Buildings Repair and Prior Direct Selection Direct 820,600.00 790,190.00 Under Review 2020-07-30 2020-08-19 2020-08-09 2020-05-19 2020-10-13 2020-08-31 2021-04-11 building Design Consulting Reconstruction SX-NRPB-186392-CS-CDS / Housing Repair and Public Asbestos Assessment TF / A8079 Buildings Repair and Post Direct Selection Direct 25,000.00 33,950.00 Signed 2020-07-29 2020-07-29 2020-08-08 2020-08-23 2020-10-12 2020-09-15 2021-04-10 Consulting Services ROBERTO Reconstruction DAVIDOVICH Individual SX-NRPB-189349-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 85,000.00 0.00 Canceled 2020-08-18 2019-11-14 2020-10-06 2020-10-27 2020-12-01 2021-05-30 HR Consultant Reconstruction Selection SX-NRPB-189691-CS-CDS / Emergency measures for the Land Negotiation for Link 6 recovery of disaster first TF / A8079 Prior Direct Selection Direct 50,000.00 0.00 Canceled 2020-08-20 2020-08-28 2020-08-30 2020-09-23 2020-11-03 2021-05-02 Road-Hubert Lopez HISMAR responders and preparedness NV facilities SX-NRPB-191068-CS-CDS / Institutional Support for TF / A8079 Prior Direct Selection Direct 125,000.00 115,000.00 Signed 2020-08-28 2021-04-01 2020-09-07 2020-10-20 2020-11-11 2020-10-22 2021-05-10 SGS Procurement Service Reconstruction SX-NRPB-196201-CS-CDS / Institutional Support for Pending TF / A8079 Post Direct Selection Direct 30,000.00 0.00 2020-09-25 2020-10-05 2020-12-09 2021-06-07 FMO Consultant Home Based Reconstruction Implementation Individual SX-NRPB-197284-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Open 180,000.00 0.00 2020-10-01 2020-11-19 2020-12-10 2021-01-14 2021-07-13 DL - Contract Manager Reconstruction Implementation Selection Individual SX-NRPB-198813-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Open 150,000.00 0.00 2020-10-15 2020-11-19 2020-12-03 2020-12-24 2021-01-28 2021-07-27 AR - Contract Manager Reconstruction Implementation Selection SX-NRPB-126986-CS-CDS / Institutional Support for Pending Corporate Governance Lawyer TF / A8079 Post Direct Selection Direct 85,690.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 Reconstruction Implementation 1 SX-NRPB-126988-CS-CDS / Institutional Support for Pending Corporate Governance Legal TF / A8079 Post Direct Selection Direct 61,250.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 Reconstruction Implementation Support 1 SX-NRPB-126989-CS-CDS / Institutional Support for Pending Corporate Governance Legal TF / A8079 Post Direct Selection Direct 28,500.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 Reconstruction Implementation Support 2 SX-NRPB-126987-CS-CDS / Institutional Support for Pending Corporate Governance Lawyer TF / A8079 Post Direct Selection Direct 79,000.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 Reconstruction Implementation 2 SX-NRPB-199448-CS-CDS / Institutional Support for Contract Manager (DL) Home TF / A8079 Post Direct Selection Direct 23,750.00 23,684.00 Signed 2020-10-13 2020-11-19 2020-10-23 2020-02-06 2020-12-27 2020-10-28 2021-06-25 Reconstruction Based SX-NRPB-170435-CS-CDS / Institutional Support for Under Interim Environmental TF / A8079 Post Direct Selection Direct 20,000.00 0.00 2020-04-24 2020-05-04 2020-07-08 2021-01-04 Reconstruction Implementation Safeguards Specialist SX-NRPB-201640-CS-CDS / Institutional Support for Under TF / A8079 Prior Direct Selection Direct 95,000.00 0.00 2020-10-26 2020-10-29 2020-11-05 2020-10-29 2021-01-09 2021-07-08 JB: Procurement Coordinator Reconstruction Implementation Individual SX-NRPB-201789-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Limited 25,000.00 0.00 2020-10-27 2020-10-27 2020-11-01 2020-11-22 2020-12-27 2021-06-25 Insurance Consultant Reconstruction Implementation Selection Page 4 SX-NRPB-201788-CS-CDS / Institutional Support for Under UB: Activity Manager Home TF / A8079 Post Direct Selection Direct 155,000.00 0.00 2020-10-27 2020-10-21 2020-11-06 2021-01-10 2021-07-09 Reconstruction Implementation Repairs SX-NRPB-201795-CS-CDS / Institutional Support for Under TF / A8079 Post Direct Selection Direct 200,000.00 0.00 2020-10-27 2020-11-24 2020-11-06 2019-11-01 2021-01-10 2021-07-09 BB: ICT Helpdesk Reconstruction Implementation Individual SX-NRPB-205755-CS-INDV / Institutional Support for Pending TF / A8079 Post Consultant Open 50,000.00 0.00 2020-11-24 2021-01-12 2021-02-02 2021-03-09 2021-09-05 Copywriter Reconstruction Implementation Selection SX-NRPB-208921-CS-CDS / Mold Assessment Institutional Support for Under TF / A8079 Post Direct Selection Direct 50,000.00 0.00 2020-12-09 2020-12-07 2020-12-19 2021-02-22 2021-08-21 Consultancy: Farmer Reconstruction Implementation Environmental Group SX-NRPB-214549-CS-CDS / Institutional Support for Under TF / A8079 Prior Direct Selection Direct 50,000.00 0.00 2021-01-18 2021-01-28 2021-01-28 2021-01-07 2021-04-03 2021-09-30 JA: Procurement Consultant Reconstruction Implementation SX-NRPB-215465-CS-CDS / Housing Repair and Public Under AC: Project Manager TF / A8079 Buildings Repair and Post Direct Selection Direct 200,000.00 0.00 2021-01-21 2021-01-20 2021-01-31 2021-01-21 2021-04-06 2021-10-03 Implementation Infrastructure Reconstruction SX-NRPB-211337-CS-CDS / Institutional Support for TF / A8079 Post Direct Selection Direct 350,000.00 0.00 Canceled 2020-12-23 2021-01-02 2021-03-08 2021-09-04 Engineer Reconstruction Emergency measures for the SX-NRPB-231555-CS-INDV / Individual recovery of disaster first Under Junior Environmental TF / A8079 Post Consultant Open 60,000.00 0.00 2021-04-29 2021-05-18 2021-06-17 2021-07-08 2021-08-12 2022-02-08 responders and preparedness Implementation Specialist Selection facilities Individual SX-NRPB-232896-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Open 15,000.00 0.00 2021-05-03 2021-05-06 2021-06-21 2021-07-12 2021-08-16 2022-02-12 HRM Consultant Reconstruction Implementation Selection Individual SX-NRPB-236664-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Open 30,000.00 0.00 2021-05-28 2021-06-08 2021-07-16 2021-08-06 2021-09-10 2022-03-09 Graphic Design Services Reconstruction Implementation Selection Individual SX-NRPB-236668-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Open 30,000.00 0.00 2021-05-28 2021-06-08 2021-07-16 2021-08-06 2021-09-10 2022-03-09 Video Production Services Reconstruction Implementation Selection Individual SX-NRPB-236671-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Open 30,000.00 0.00 2021-05-28 2021-06-08 2021-07-16 2021-08-06 2021-09-10 2022-03-09 Animation Services Reconstruction Implementation Selection SX-NRPB-239247-CS-CDS / Institutional Support for Under Social Safeguards Consultant: TF / A8079 Post Direct Selection Direct 200,000.00 0.00 2021-06-14 2021-06-24 2021-08-28 2022-02-24 Reconstruction Implementation Jo-Ann George SX-NRPB-240330-CS-CDS / Institutional Support for Pending TF / A8079 Post Direct Selection Direct 280,000.00 0.00 2021-06-18 2021-06-20 2021-06-23 2023-05-31 MH: Project Manager EDMP Reconstruction Implementation Page 5 Coopération Cameroun – Banque Mondiale Ministère de l’Habitat et du Développement Urbain Ministry of Housing and Urban Development SECRETARIAT GENERAL- GENERAL SECRETARIAT Cellule de Préparation – Preparation Unit Projet de Développement des Villes Inclusives – Preparation of the proposed Cameroon Inclusive Cities Project PPA IDA V0100 PLAN DE PASSATION DES MARCHES-JANVIER 2017 VERSION N°4 I. GENERAL 1. Informations sur le Projet Emprunteur : REPUBLIQUE DU CAMEROUN Ministère Responsable: MINISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN Nom du Projet : Projet de Développement des Villes Inclusives au Cameroun (PDVI) Agence d’exécution du Projet en phase de préparation: Cellule de Préparation du PDVI (CP/PDVI). 2. Date d’approbation de la version originale (version N°1) par la Banque du Plan de Passation des Marchés : 12/01/2016 3. Date de publication de l’Avis Général de Passation des Marchés: 4. Période couverte par le Plan de Passation des Marchés : 1er janvier 2017 au 31 décembre 2017 5. Evaluation de risque par P-RAMS (Procurement Risk Asses ment and Management System) : Elevé II. TRAVAUX, FOURNITURES ET SERVICES NON INTELLECTUELS 1. Dispositions relatives aux seuils de revue préalable : seuils requis pour les décisions de marchés soumis à la 1 revue préalable de la Banque, tel que prévu dans l’annexe 1 des "Directives de Passation des Marchés de fournitures, de travaux et de services (autres que les services de consultants) par les Emprunteurs de la Banque mondiale dans le cadre des prêts de la BIRD et des crédits de l’AID". Catégories de Seuils de revue Observations marchés/Méthode de passation a priori des marchés Montants estimatifs des contrats en millions de dollars américains Travaux, Contrats clé en main et Contrats de Fourniture et Montage >= 5 d’Installations Fournitures, Système d’information, et Services autres que les services >= 1.5 de consultants Travaux, Contrats clé en main et Contrats de >= 5 Les Fourniture et justifications de Montage Contrats à passer l’entente d’Installations par entente directe devront Fournitures, directe être jointes et Système approuvées d’information, avec le PPM et Services >= 1.5 autres que les services de consultants 2. Pré qualification : les soumissionnaires, en cas de pré- qualification, (voir dans le tableau ci-joint) seront pré qualifiées en accord avec les dispositions des paragraphes 2.9 et 2.10 des directives. 3. Seuils pour les méthodes de passation des marchés : les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES (US$ TRAVAUX (US$ équivalent) équivalent) 2 AOI AON CF AOI AON CF ≥10,000,00 <10,000, < ≥1,000, <1,000,00 < 0 000 200,000 000 0 100,000 4. Dispositions spéciales sur les marchés : concernant les acquisitions de véhicules et de carburant, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur d’USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque ou distributeurs de produits pétroliers). 5. Liste des marchés de fourniture Coût Coût Revue Date Observat Méthod Estimatif Estimati par la prévue ions/ Réf e de Description (USD) f Banque de Date fin . sélectio prestatio HTVA (USD) (Priori/P l'ouvert n ns TTC ost) ure Gestion du projet Acquisition d'un logiciel comptable et suivi-évaluation Date de (TOM2PRO/TOM2MO 43,725 clôture 1 36,667 SED Post N/A NITORING) y compris du la formation et projet l’assistance technique Renouvellement Contrat annuel de gardiennage des biens et locaux de la 31/12/1 2 Cellule de 7,200 8,587 SED Post N/A Préparation du Projet 7 de Développement des villes Inclusives (PDVI) Renouvellement du contrat annuel de la Couverture médicale du personnel de la 43,725 28/05/1 3 Cellule de 36,667 SED Post N/A Préparation du Projet 8 de Développement des villes Inclusives (PDVI) Marché à commande 31/05/1 4 pour la maintenance 27,926 33,300 SED Post N/A des véhicules du 8 3 Projet pour une durée d’un an Fourniture de 18/04/1 08/05/1 5 mobilier pour la 45,833 54,656 CF Post CP/PDVI 7 7 Total 183,99 154,293 3 III. SÉLECTION DES CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable des marchés : décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans l’annexe 1 du Guide de Sélection et d’Emploi des Consultants par les Emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID. Méthode de Seuils de revue Observations sélection/Catégories de a priori marchés Montants estimatifs des contrats en millions de dollars américains Méthode compétitive/Firmes >= 0.5 de consultants Entente directe/firmes de >= 0.5 consultants Les justifications de Entente directe/Consultants >= 0.2 l’entente directe devront individuel être jointes et approuvées Méthode Compétitive >= 0.2 avec le PPM (Comparaison de CVs)/ Consultants individuels 2. Liste restreinte composée entièrement de firmes nationales: la liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du paragraphe 2.7 des Directives de Sélection et d’Emploi des Consultants, et l’Emprunteur ne procède pas à une publication dans UNDB. 3. Autre arrangement spécial de Sélection de consultants : le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est 4 déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; cependant, ce seuil ne devrait pas dépasser la contre-valeur de USD 300,000 sauf dans des cas exceptionnels prévus au paragraphe 3.7 des directives pour la sélection et l’emploi des consultants par les emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID. 4. Liste des Consultations, avec les méthodes de sélection et les dates de mise en œuvre CONSULTANTS 1 2 3 4 5 6 7 8 9 Coût Revu Préfér Coût Estima Métho Pré e Date Etape/ ence Estim tif de qualifi Banq prévue Date fin Nation Réf Description atif (USD) passati cation ue ouvertu des ale (USD) TTC on du (oui/no (Prior re prestati (oui/no HTVA marché n) i/ offres ons n) Post) Recrutement d’un consultant (firme) pour la réalisation des EIES et PAR des sous 166,66 198,75 22/06/1 1 projets de 7 0 QC non non post N/A proximité dans 7 les villes de Yaoundé, Douala, Batouri, Kumba et Ngaoundéré Recrutement d’un consultant formateur dans le cadre de 11,666 13,912 30/04/1 2 l’atelier CI non non post N/A itinérant sur la 7 note méthodologiqu e CCE dans les 5 villes Recrutement de l’évaluateur externe pour la mise en œuvre 31/12/1 3 des PAR dans 7,000 8,347 CI non non post N/A les villes de 7 Yaoundé, Douala, Batouri, 5 Kumba et Ngaoundéré. Recrutement d’un consultant (firme) pour la réalisation des études APS/APD/DAO 142,0 169,43 22/12/1 4 QC non non post N/A de travaux 83 4 7 d'Aménageme nt de proximité dans les villes de Batouri, Kumba, et Ngaoundéré Recrutement d’un consultant (firme) pour la réalisation des études 139,3 166,15 22/12/1 5 QC non non post N/A APS/APD/DAO 33 5 7 de travaux d'Aménageme nt de proximité dans la ville de Douala Recrutement d’un consultant (firme) pour la réalisation des études 137,5 163,96 22/12/1 6 QC non non post N/A APS/APD/DAO 00 9 7 de travaux d'Aménageme nt de proximité dans la ville de Yaoundé Recrutement d’un consultant (firme) pour la réalisation des études APS/APD/DAO 21/12/1 7 de travaux 70,00 QC non non post N/A pilotes pour la 83,500 7 0 mobilité piétonne dans certains quartiers de la ville de Yaoundé 6 Gestion du Projet Avenant au contrat du 8 49,603 59,151 SED Non Non Priori 30/09/17 Coordonnate N/A ur du PDVI Avenant au contrat du Responsable 9 16,931 20,190 CI Non Non Priori N/A 30/09/17 Administratif et Financier du PDVI Avenant au contrat du 10 15,873 18,929 SED Non Non Priori N/A 30/09/17 Comptable du PDVI Avenant au Contrat du Responsable 11 environnem 15,873 18,929 SED Non Non Priori N/A 30/09/17 ental et social du PDVI Recrutemen t d’un Spécialiste en 12 22,500 26,831 CI Non Non Priori N/A 31/12/19 développem ent social au sein de la CP/PDVI Recrutemen Activité t d‘un de consultant passatio (firme) - n des marchés chargé de menée l’audit 13 33,334 39,750 SFQC Non Non Priori par le comptable MINEPAT et financier du PDVI, exercices 2016 et 2017 Avenant au Contrat de l’Assistant 14 7,937 9,464 SED Non Non Post N/A 30/09/17 Administratif et financier du PDVI Avenant au contrat de FCP 15 4,762 5,679 SED Non Non Post N/A l’Assistante 30/09/17 du 7 coordonnate ur Avenant au FCP Contrat de 31/12/17 16 l’Assistant 10,582 12,619 SED Non Non Post N/A Avenant de Passation signé des Marchés Avenant au FCP contrat de 31/12/17 17 2,540 3,029 SED Non Non Post N/A l’Agent Avenant administratif signé Total 924,104 1, 101 994 NB :Le taux du dollar (USD) appliqué est de 1USD= 600 F CFA. Le Taux de conversion du dollar (USD) utilisé est le Cours du dollar à la date de financement des fonds de préparation du Projet(PPA) SFQC : Sélection fondée sur la Qualité et le Coût DC/CF : Demande de Cotations/ Consultation Fournisseurs SMC : Sélection fondée sur le Moindre Coût CI : Consultant Individuel QC : Sélection basée sur les qualifications des Consultants SED/ED: Sélection par Entente Directe / Entente Directe SCBD : Sélection dans le Cadre d’un Budget Déterminé Post : Revue à postériori Priori : Revue à priori MINHDU : Ministère de l’Habitat et du Développement Urbain CP : Cellule de Préparation du Projet PPM: Plan de Passation des Marchés FCP : Fonds de contrepartie 8 PROCUREMENT Cameroon : Cameroon: Inclusive and Resilient Cities Development Project PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan: 2017-04-10 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156210 GPN Date: 2019-08-05 Project Name: Cameroon: Inclusive and Resilient Cities Development Project Loan / Credit No: IDA / V0100, IDA / 61320 M Executing Agency(ies): INISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CM-MINHDU-91226-CW-RFB Improving Connectivity and / Réalisation des travaux de Single Stage - One 2,506,561.2 2021-09- IDA / 61320 Living environment in Post Request for Bids Open - National 1,958,297.00 Signed 2020-01-20 2020-03-19 2020-02-19 2020-04-03 2020-04-29 2020-05-03 2020-08-12 2020-06-07 2020-10-07 voiries structurantes dans la Envelope 8 30 Beneficiary Cities ville de Batouri CM-MINHDU-91158-CW-RFB / Réalisation des travaux de Improving Connectivity and Under Single Stage - One 27,090,022.0 15,579,588. 2022-07- voiries structurantes dans la IDA / 61320 Living environment in Prior Request for Bids Open - International Implementat 2019-12-15 2020-03-10 2020-01-26 2020-03-31 2020-04-25 2020-05-26 2020-06-06 2021-06-04 2020-07-11 Envelope 0 70 31 ville de Yaoundé CAY5 et Beneficiary Cities ion CAY7 CM-MINHDU-91198-CW-RFB / Réalisation des travaux de Improving Connectivity and Single Stage - One 16,746,128.0 10,761,781. 2022-08- voiries structurantes dans les IDA / 61320 Living environment in Prior Request for Bids Open - International Signed 2020-01-15 2020-03-04 2020-02-26 2020-03-30 2020-05-26 2020-05-28 2020-07-07 2021-02-16 2020-08-11 2021-04-15 Envelope 0 72 31 Arrondissements de Douala Beneficiary Cities 3e et 5e CM-MINHDU-91349-CW-RFB / réalisation des travaux de Improving Connectivity and Single Stage - One 2022-12- plantation d'arbres dans les IDA / 61320 Living environment in Post Request for Bids Open - National 490,462.00 0.00 Canceled 2020-05-19 2020-06-12 2020-07-17 2020-08-16 2020-09-20 Envelope 09 arrondissements de Douala 3e Beneficiary Cities et 5e CM-MINHDU-91218-CW-RFB Improving Connectivity and / Réalisation des travaux de Single Stage - One 2022-10- IDA / 61320 Living environment in Post Request for Bids Open - National 6,557,298.00 0.00 Canceled 2020-06-15 2020-07-06 2020-08-17 2020-09-16 2020-10-21 voiries structurantes dans la Envelope 11 Beneficiary Cities ville de Kumba CM-MINHDU-91344-CW-RFB / Réalisation des travaux Improving Connectivity and d'ouvrages de drainage Single Stage - One 21,638,050.0 14,416,042. 2022-08- IDA / 61320 Living environment in Prior Request for Bids Open - International Signed 2020-01-15 2020-03-04 2020-02-26 2020-05-12 2020-05-26 2020-05-26 2020-07-07 2021-02-23 2020-08-11 2021-04-15 structurants dans les Envelope 0 38 31 Beneficiary Cities arrondissements de Douala 3e et 5e CM-MINHDU-91229-CW-RFB Improving Connectivity and / Réalisation des travaux de Single Stage - One 2022-05- IDA / 61320 Living environment in Prior Request for Bids Open - National 8,217,373.00 0.00 Canceled 2019-12-25 2020-02-05 2020-03-18 2020-04-29 2020-06-03 voiries structurantes dans la Envelope 24 Beneficiary Cities ville de Ngaoundéré CM-MINHDU-168199-CW- RFB / Réalisation des travaux Improving Connectivity and Single Stage - One 6,895,762.6 2022-02- de voiries structurantes dans IDA / 61320 Living environment in Prior Request for Bids Open - International 8,217,373.00 Signed 2020-05-15 2020-04-24 2020-05-20 2020-04-24 2020-07-01 2020-06-11 2020-07-31 2020-11-02 2020-09-04 2020-12-21 Envelope 3 26 la ville de Ngaoundéré– Beneficiary Cities Cameroun CM-MINHDU-169945-CW- RFQ / Travaux de cloisement Project Management, Request for Single Stage - One 2020-11- des espaces pour créer des IDA / 61320 Coordination, Monitoring and Post Limited 8,393.00 7,511.75 Completed 2020-08-25 2020-07-07 2020-10-20 2020-09-14 Quotations Envelope 19 bureaux à la Cellule de Evaluation Coordination du projet CM-MINHDU-212924-NC- RFQ / Petit travaux Project Management, d'installation du groupe Request for Single Stage - One 2021-04- IDA / 61320 Coordination, Monitoring and Post Limited 6,860.00 6,977.65 Signed 2021-03-06 2021-02-05 2021-04-03 2021-03-12 électrogène SDMO 16KVA Quotations Envelope 13 Evaluation avec inverseur automatique au PDVIR CM-MINHDU-233545-CW- RFB / Travaux de voiries Improving Connectivity and Request for Bids - Pending structurantes dans Single Stage - One 2023-04- IDA / 61320 Living environment in Post Request for Bids Open - National Works French Civil 6,910,337.00 0.00 Implementat 2021-06-15 2021-07-15 2021-08-26 2021-09-25 2021-11-06 l’Arrondissement de Douala Envelope 30 Beneficiary Cities Law (French) SPD ion 5ème, Cameroun : Tronçon : PK 11-Fin goudron Logpom GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11636-GO-RFQ Project Management, Request for Single Stage - One / Fourniture de mobilier pour IDA / V0100 Coordination, Monitoring and Post Limited 54,656.00 0.00 Canceled 2017-06-11 2017-07-20 2017-08-03 Quotations Envelope la CP/PDVI Evaluation CM-MINHDU-91885-GO-RFB Strengthening Capacity for / Acquisition de logiciels pour Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 250,000.00 0.00 Canceled 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2020-01-20 la programmation de Envelope Management l'entretien des VRD et drains CM-MINHDU-91875-GO-RFQ / Acquisition du matériel pour Strengthening Capacity for Request for Single Stage - One la mise en place d'une gestion IDA / 61320 Inclusive and Resilient Urban Post Open - National 83,334.00 0.00 Canceled 2019-09-04 2019-10-30 2019-12-29 Quotations Envelope informatisée des opérations Management d'investissement à la DOU CM-MINHDU-91851-GO-RFB / Achat des équipements pour Strengthening Capacity for Single Stage - One le centre de formation des IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 210,000.00 0.00 Canceled 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2019-12-21 Envelope jeunes aux travaux urbains à Management Kumba et Ngaoundére Page 1 CM-MINHDU-125030-GO- RFB / Acquisition des Project Management, matériels informatiques et de Single Stage - One IDA / 61320 Coordination, Monitoring and Post Request for Bids Open - National 128,468.00 0.00 Canceled 2019-08-30 2019-09-04 2019-10-04 2019-11-03 2019-12-08 2020-01-07 bureau pour la Cellule de Envelope Evaluation Coordination et les UTL du PDVIR CM-MINHDU-144044-GO- RFQ / Fourniture du matériel Project Management, de bureau, des produits de Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 8,393.00 41,873.01 Signed 2019-12-10 2020-09-14 2020-02-04 2020-10-09 2020-03-05 réception et d’entretien à la Quotations Envelope Evaluation Cellule de Coordination du PDVIR CM-MINHDU-91924-GO-RFQ Project Management, Request for Single Stage - One / Acquisition de matériel IDA / 61320 Coordination, Monitoring and Post Open - National 41,661.00 0.00 Canceled 2019-12-07 2020-02-01 2020-04-01 Quotations Envelope informatique pour les UTL Evaluation CM-MINHDU-139715-GO- RFQ / Acquisition du matériel Project Management, Request for Single Stage - One et équipement informatique à IDA / 61320 Coordination, Monitoring and Post Limited 59,952.00 0.00 Canceled 2019-12-25 2020-02-19 2020-03-20 Quotations Envelope la Cellule de Coordination du Evaluation PDVIR CM-MINHDU-91926-GO-RFQ Project Management, / Achat de 05 véhicules Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 214,113.00 0.00 Canceled 2019-12-07 2020-02-01 2020-05-31 pickup double cabine Quotations Envelope Evaluation respectivement pour les UTL CM-MINHDU-91929-GO-RFQ Project Management, / Fourniture de bureau et Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Open - National 8,393.00 0.00 Canceled 2019-12-07 2020-02-01 2020-03-02 consommable informatique à Quotations Envelope Evaluation la CC/PDVIR CM-MINHDU-169961-GO- Project Management, RFQ / Acquisition du petit Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 6,851.00 3,863.70 Completed 2020-05-20 2020-07-07 2020-07-15 2020-09-14 2020-08-14 2020-11-27 matériel de lutte contre le Quotations Envelope Evaluation COVID 19. CM-MINHDU-144105-GO- RFB / Acquisition d'un (01) véhicule 4X4 station Wagon Project Management, Single Stage - One pour la Cellule de IDA / 61320 Coordination, Monitoring and Post Request for Bids Open - National 299,759.00 310,893.09 Signed 2020-05-30 2020-10-12 2020-06-04 2020-10-15 2020-07-16 2020-11-12 2020-08-15 2020-12-09 2020-09-19 2021-01-18 2020-11-18 Envelope Coordination du PDVIR et de Evaluation cinq (05) véhicules pickup double cabine pour les UTL. CM-MINHDU-91853-GO-RFB / Fourniture d'un drone Strengthening Capacity for Under professionnelle et d'une Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - International 208,334.00 0.00 Implementati 2020-08-20 2020-12-16 2020-08-25 2020-12-16 2020-10-24 2021-01-21 2020-11-23 2020-12-28 2021-02-26 plateforme Envelope Management on photogrammétrique au MINDCAF CM-MINHDU-91887-GO-RFQ Project Management, / Fourniture et pose des Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Open - National 70,808.00 0.00 Canceled 2020-05-20 2020-07-15 2021-07-15 babillards dans les CTD de Quotations Envelope Evaluation ressort du Projet CM-MINHDU-91862-GO-RFB / Acquisition de GPS bi- Strengthening Capacity for Under fréquence au profit de trois Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 125,000.00 0.00 Implementati 2020-06-15 2020-12-10 2020-06-20 2020-12-16 2020-08-01 2021-01-21 2020-08-31 2020-10-05 2020-12-04 délégations départementales Envelope Management on du MINDCAF( N'Gaoundéré, Kumba et Batouri) CM-MINHDU-144110-GO- RFQ / Fourniture et pose des Project Management, Under babillards dans les Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 70,808.00 0.00 Implementati 2020-10-05 2020-11-30 2020-12-30 Collectivités Territoriales Quotations Envelope Evaluation on Décentralisées (CTD) de ressort du projet. CM-MINHDU-169970-GO- Project Management, RFQ / Acquisition fournitures Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 42,000.00 3,520.43 Signed 2020-08-04 2020-09-14 2020-09-29 2020-10-09 2021-09-24 de Bureau, d'entretien et de Quotations Envelope Evaluation pose café CM-MINHDU-169989-GO- RFQ / Acquisition mobilier de Project Management, Request for Single Stage - One bureau pour le nouveau IDA / 61320 Coordination, Monitoring and Post Limited 13,700.00 13,585.38 Signed 2020-09-20 2020-09-14 2020-11-15 2020-10-13 2020-12-15 Quotations Envelope personnel (personnel clé et Evaluation d'appui) CM-MINHDU-169984-GO- RFQ / Acquisition des Project Management, Under consommable informatiques Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 68,000.00 0.00 Implementati 2020-08-30 2020-10-11 2021-10-06 pour la Cellule de Quotations Envelope Evaluation on Coordination du PDVIR et les UTL CM-MINHDU-196965-GO- Project Management, RFQ / Fourniture du mobilier Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 32,550.00 33,527.10 Signed 2020-11-25 2020-12-28 2021-01-13 2021-02-26 2021-02-12 de bureau au profit des UTL Quotations Envelope Evaluation dans le cadre du PDVIR CM-MINHDU-144060-GO- RFQ / Acquisition du matériel informatique pour la Cellule de Coordination (CC), les Strengthening Capacity for Single Stage - One Unités Techniques de Liaison IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 214,113.00 0.00 Canceled 2020-08-30 2020-08-13 2020-08-31 2020-10-12 2020-09-30 2020-11-11 2020-12-16 2021-01-15 Envelope (UTL) et les Collectivités Management Territoriales Décentralisées (CTD) ou mairies concernées par le projet. Page 2 CM-MINHDU-197279-GO- RFB / Fourniture et installation du matériel informatique à la Cellule de coordination, aux Unités Strengthening Capacity for Under Single Stage - One Techniques de Liaison (UTL) et IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 393,000.00 0.00 Implementati 2020-11-30 2020-12-14 2020-12-05 2020-12-16 2021-01-04 2021-01-22 2021-01-19 2021-02-02 2021-02-16 2021-03-18 Envelope aux collectivités territoriales Management on décentralisées (CTD) du projet de développement des villes inclusives et résilientes ( quatre lots) CM-MINHDU-179225-GO- DIR / Fourniture de matériels Strengthening Capacity for de lutte contre le Covid-19 IDA / 61320 Inclusive and Resilient Urban Post Direct Selection Direct 215,826.00 0.00 Canceled 2020-07-30 2020-08-04 2020-09-08 2020-11-07 dans toutes les villes du Management projet. CM-MINHDU-196921-GO- RFQ / Production et édition des supports de communication pour la Strengthening Capacity for CCP/PDVIR et les UTL Request for Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Limited 25,693.00 0.00 Canceled 2020-12-12 2021-01-09 2021-01-30 (Agendas, stylos personnalisé, Quotations Envelope Management casquettes, polos, carte de visite, plaquette mural, calendriers, auto collants sur les véhicules CM-MINHDU-223169-GO- RFQ / Achat du nouveau Project Management, Pending Request for Single Stage - One matériel contre la COVID-19 IDA / 61320 Coordination, Monitoring and Post Limited 3,430.00 0.00 Implementati 2021-04-10 2021-05-22 2021-06-21 Quotations Envelope pour la Cellule de Evaluation on Coordination du Projet CM-MINHDU-226972-GO- RFQ / Souscription d’une police d’assurance annuelle pour les sept nouveaux Project Management, Pending véhicules de la Cellule de Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 27,444.00 0.00 Implementati 2021-05-15 2021-07-05 2021-07-19 Coordination du Projet de Quotations Envelope Evaluation on Développement des Villes Inclusives et Résilientes (PDVIR) et des Unités Techniques de Liaison (UTL) CM-MINHDU-91891-NC-RFQ / Production et édition des supports de communication destinés à améliorer la Project Management, Pending visibilité du projet au plan Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Open - National 42,881.00 0.00 Implementati 2021-08-04 2021-10-14 2022-10-09 national comme au niveau Quotations Envelope Evaluation on local (roll up, flyers, porte- document, plaquettes, agendas, calendriers, gadgets, magazine, etc.) pour un an. CM-MINHDU-226967-GO- RFQ / Acquisition des outils de communication : Téléphones portables et Project Management, Pending Request for Single Stage - One Modem internet au profit du IDA / 61320 Coordination, Monitoring and Post Limited 18,765.00 0.00 Implementati 2021-08-04 2021-09-22 2021-10-06 Quotations Envelope personnel de la Cellule de Evaluation on Coordination du PDVIR (CCP) et des Unités Techniques de Liaison (UTL) CM-MINHDU-221645-GO- RFQ / Acquisition du matériel Project Management, Pending Request for Single Stage - One pour la tenue des visio IDA / 61320 Coordination, Monitoring and Post Limited 6,861.00 0.00 Implementati 2021-04-10 2021-06-05 2021-06-20 Quotations Envelope conférences de groupe Evaluation on (micro,camera, ecran ect...) CM-MINHDU-212718-GO- RFB / Fourniture du matériel d'hygiène et de salubrité au profit des comités de Strengthening Capacity for Pending Développement des Quartiers Single Stage - One IDA / 61320 Inclusive and Resilient Urban Post Request for Bids Open - National 137,221.00 0.00 Implementati 2021-04-15 2021-04-20 2021-06-01 2021-07-01 2021-08-05 2021-10-04 (CDQ) et autres associations Envelope Management on dans les communes ( CUY5 et 7, CUD 3 et 5, CAM et CAM 1, CUN, CAN2, KO, Ba) dans le cadre du PDVIR NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11327-NC-DIR / Acquisition d'un logiciel Project Management, comptable et suivi-évaluation IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 43,725.00 34,496.28 Signed 2017-01-10 2016-06-17 2017-01-17 2016-09-07 2017-02-21 2017-06-19 2023-02-21 (TOM2PRO/TOM2MONITORIN Evaluation G) y compris la formation et l’assistance technique CM-MINHDU-11332-NC-DIR Project Management, / Marché à commande pour la IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 33,300.00 0.00 Canceled 2017-03-31 2017-04-05 2017-05-10 2018-05-10 maintenance des véhicules du Evaluation Projet pour une durée d'un an CM-MINHDU-11326-NC-DIR / Renouvellement Contrat annuel de gardiennage des Project Management, biens et locaux de la Cellule IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 8,587.00 0.00 Canceled 2017-05-15 2017-05-21 2017-06-28 2018-06-28 de Préparation du Projet de Evaluation Développement des villes Inclusives (PDVI) CM-MINHDU-11329-NC-DIR / Renouvellement du contrat annuel de la Couverture Project Management, médicale du personnel de la IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,725.00 0.00 Canceled 2017-04-18 2017-04-23 2017-05-18 2018-05-18 Cellule de Préparation du Evaluation Projet de Développement des villes Inclusives (PDVI) Page 3 CM-MINHDU-17089-NC-RFQ Project Management, / Marché à commande pour la Request for Single Stage - One IDA / V0100 Coordination, Monitoring and Post Limited 33,330.00 0.00 Canceled 2017-06-19 2017-08-05 2018-08-05 maintenance des véhicules du Quotations Envelope Evaluation Projet pour une durée d'un an CM-MINHDU-17127-NC-RFQ / Contrat annuel de gardiennage des biens et Project Management, Request for Single Stage - One locaux de la Cellule de IDA / V0100 Coordination, Monitoring and Post Limited 8,587.00 0.00 Canceled 2017-06-19 2017-08-14 2018-08-14 Quotations Envelope Préparation du Projet de Evaluation Développement des villes Inclusives (PDVI) CM-MINHDU-17129-NC-RFQ / Contrat annuel de la Couverture médicale du Project Management, Request for Single Stage - One personnel de la Cellule de IDA / V0100 Coordination, Monitoring and Post Limited 43,725.00 0.00 Canceled 2017-06-19 2017-08-14 2018-08-14 Quotations Envelope Préparation du Projet de Evaluation Développement des villes Inclusives (PDVI) CM-MINHDU-27490-NC-RFQ Project Management, Request for Single Stage - One / Maintenance du matériel IDA / 61320 Coordination, Monitoring and Post Limited 5,000.00 0.00 Canceled 2017-10-02 2017-11-06 2018-11-01 Quotations Envelope informatique du PDVIR Evaluation CM-MINHDU-111114-NC- Project Management, RFQ / Prestation de services Request for Single Stage - One IDA / V0100 Coordination, Monitoring and Post Limited 27,926.00 0.00 Canceled 2019-09-27 2019-11-22 2020-11-21 pour la maintenance des Quotations Envelope Evaluation véhicules du Projet CM-MINHDU-91913-NC-RFQ Project Management, Request for Single Stage - One / Couverture médicale du IDA / 61320 Coordination, Monitoring and Post Limited 34,258.00 25,938.79 Signed 2019-12-22 2020-03-02 2020-02-16 2020-04-30 2021-02-15 Quotations Envelope personnel de la CC/ PDVIR Evaluation CM-MINHDU-144285-NC- Project Management, RFQ / Service de gardiennage Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Open - National 8,221.00 17,040.38 Signed 2020-01-25 2020-03-21 2020-04-30 2021-03-16 à la Cellule de Coordination Quotations Envelope Evaluation du PDVIR CM-MINHDU-144284-NC- Project Management, Request for Single Stage - One RFQ / Maintenance de cinq IDA / 61320 Coordination, Monitoring and Post Limited 34,258.00 23,167.07 Signed 2020-01-25 2020-04-09 2020-03-21 2020-07-20 2021-03-16 Quotations Envelope (05) véhicules du Projet. Evaluation CM-MINHDU-169948-NC- RFQ / Reprographie externe Project Management, Request for Single Stage - One des documents très IDA / 61320 Coordination, Monitoring and Post Limited 8,393.00 8,792.18 Signed 2020-05-30 2020-07-06 2020-07-25 2020-09-22 2021-07-20 Quotations Envelope volumineux (DAO, plans etc..) Evaluation (accord cadre renouvelable) CM-MINHDU-169953-NC- Project Management, RFQ / Fourniture connexion Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 7,194.00 7,511.75 Signed 2020-06-27 2020-06-15 2020-08-22 2020-09-14 2021-08-17 internet haut débit à la cellule Quotations Envelope Evaluation de Coordination du Projet CM-MINHDU-156983-NC- Project Management, Under RFQ / Assurance des Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 8,564.00 0.00 Implementati 2020-03-01 2020-04-26 2020-05-26 véhicules de la Cellule de Quotations Envelope Evaluation on Coordination du projet CM-MINHDU-169951-NC- Project Management, Request for Single Stage - One RFQ / Entretien et réparation IDA / 61320 Coordination, Monitoring and Post Limited 8,000.00 4,449.98 Signed 2020-08-15 2020-09-25 2020-10-10 2020-12-16 2021-10-05 Quotations Envelope des copieurs Evaluation CM-MINHDU-144808-NC- Project Management, Request for Single Stage - One RFQ / Maintenance du IDA / 61320 Coordination, Monitoring and Post Limited 8,000.00 4,302.91 Signed 2019-12-22 2020-01-03 2020-02-16 2020-01-20 2021-02-10 Quotations Envelope matériel informatique. Evaluation CM-MINHDU-221664-NC- Project Management, Pending RFQ / Police d'assurance du Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 64,198.00 0.00 Implementati 2021-05-05 2021-06-30 2022-06-25 personnel de la CCP et des Quotations Envelope Evaluation on UTL CM-MINHDU-212920-NC- RFQ / Fourniture de services Project Management, Pending de maintenance préventive et Request for Single Stage - One IDA / 61320 Coordination, Monitoring and Post Limited 4,112.00 0.00 Implementati 2021-01-25 2021-03-01 2022-02-24 curative des réseaux Quotations Envelope Evaluation on électriques et de climatisation des locaux du PDVIR CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11686-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Improving Connectivity and Consultant études APS/APD/DAO de IDA / V0100 Living environment in Post Qualification Open - National 163,969.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 travaux d'Aménagement de Beneficiary Cities Selection proximité dans la ville de Yaoundé CM-MINHDU-11647-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Project Management, Consultant EIES et PAR des sous projets IDA / V0100 Coordination, Monitoring and Post Qualification Open - National 198,750.00 0.00 Canceled 2017-05-15 2017-06-05 2017-07-05 2017-07-15 2017-08-04 2017-11-02 de proximité dans les villes de Evaluation Selection Yaoundé, Douala, Batouri, Kumba et Ngaoundéré CM-MINHDU-11677-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Improving Connectivity and Consultant études APS/APD/DAO de IDA / V0100 Living environment in Post Qualification Open - National 169,434.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 travaux d'Aménagement de Beneficiary Cities Selection proximité dans les villes de Batouri, Kumba, et Ngaoundéré Page 4 CM-MINHDU-11689-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Improving Connectivity and Consultant études APS/APD/DAO de IDA / V0100 Living environment in Post Qualification Open - National 83,500.00 0.00 Canceled 2017-05-01 2017-05-22 2017-06-21 2017-07-01 2017-07-21 2018-01-17 travaux pilotes pour la Beneficiary Cities Selection mobilité piétonne dans certains quartiers de la ville de Yaoundé CM-MINHDU-11682-CS-CQS / Recrutement d'un consultant (firme) pour la réalisation des Improving Connectivity and Consultant études APS/APD/DAO de IDA / V0100 Living environment in Post Qualification Open - National 166,155.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 travaux d'Aménagement de Beneficiary Cities Selection proximité dans la ville de Douala CM-MINHDU-11762-CS- QCBS / Recrutement d'un Project Management, consultant (firme) chargé de Quality And Cost- IDA / V0100 Coordination, Monitoring and Prior Open - National 39,750.00 0.00 Canceled 2017-04-16 2017-05-07 2017-06-20 2017-07-18 2017-08-17 2017-09-21 2017-10-26 2018-10-26 l'audit comptable et financier Based Selection Evaluation du PDVI, exercices 2016 et 2017 CM-MINHDU-91365-CS- QCBS / Contrôle et surveillance pour la réalisation Improving Connectivity and des travaux de voiries et Quality And Cost- IDA / 61320 Living environment in Prior Open - International 1,790,321.00 1,624,270.75 Signed 2019-01-26 2019-11-15 2019-02-23 2019-12-13 2019-05-06 2020-04-24 2019-06-05 2020-06-03 2019-07-17 2020-09-24 2019-09-11 2020-12-22 2019-10-16 2021-02-04 2022-01-03 ouvrages de drainage Based Selection Beneficiary Cities structurants dans les arrondissements de Douala 3e et 5e CM-MINHDU-91367-CS- QCBS / Contrôle et Improving Connectivity and surveillance pour la réalisation Quality And Cost- IDA / 61320 Living environment in Post Open - National 140,116.00 106,549.83 Signed 2020-02-20 2019-06-04 2020-03-19 2020-05-30 2020-01-30 2020-06-29 2020-05-13 2020-08-10 2020-06-02 2020-10-05 2020-08-24 2020-11-09 2020-10-07 2022-03-04 des travaux de voiries Based Selection Beneficiary Cities structurants dans la ville de Batouri CM-MINHDU-91433-CS- QCBS / Maitrise d'œuvre Improving Connectivity and complète pour la réalisation Quality And Cost- Under IDA / 61320 Living environment in Post Open - International 622,817.00 0.00 2019-05-14 2020-05-26 2019-06-11 2020-06-10 2019-08-22 2021-05-04 2019-09-21 2019-11-02 2019-12-28 2020-02-01 2022-03-22 des travaux de voiries et Based Selection Implementation Beneficiary Cities d'équipements de proximité de Douala 3e et 5e CM-MINHDU-91375-CS- QCBS / Contrôle et Improving Connectivity and surveillance pour la réalisation Quality And Cost- IDA / 61320 Living environment in Post Open - National 587,953.00 0.00 Canceled 2019-02-19 2019-03-19 2019-05-30 2019-06-29 2019-08-10 2019-10-05 2019-11-09 2021-11-28 des travaux de voiries Based Selection Beneficiary Cities structurants dans la ville de Ngaoundere CM-MINHDU-122434-CS- CQS / Etudes techniques (APS/APD), et production de Dossier d’Appel d’Offres(DAO) Improving Connectivity and Consultant en vue de la réalisation de IDA / V0100 Living environment in Post Qualification Open - National 160,000.00 148,746.20 Signed 2016-02-15 2016-02-15 2016-03-07 2016-04-20 2016-04-07 2016-05-20 2016-04-20 2016-06-24 2016-05-31 2016-12-21 travaux de voiries et ouvrages Beneficiary Cities Selection de drainage structurants dans les arrondissements de Douala 3ème et 5ème . CM-MINHDU-122432-CS- Strengthening Capacity for Consultant CQS / Appui à la préparation IDA / V0100 Inclusive and Resilient Urban Post Qualification Open - National 170,000.00 119,006.34 Signed 2016-07-28 2016-03-16 2016-08-18 2016-10-01 2016-05-09 2016-10-31 2016-09-20 2016-12-05 2016-12-09 2017-06-03 des contrats de ville de Management Selection Ngaoundéré et Batouri. CM-MINHDU-122442-CS- CQS / Appui à la préparation Strengthening Capacity for Consultant des contrats de ville des IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 190,000.00 148,376.65 Signed 2016-07-27 2016-08-08 2016-08-17 2016-09-30 2016-05-09 2016-10-30 2016-09-30 2016-12-04 2016-11-28 2017-06-02 communes d’arrondissements Management Selection de Yaoundé 5, 7, Douala 3 et Douala 5. CM-MINHDU-122439-CS- Strengthening Capacity for Consultant CQS / Appui à la préparation IDA / V0100 Inclusive and Resilient Urban Post Qualification Open - National 150,000.00 92,114.65 Signed 2016-07-27 2016-03-23 2016-08-17 2016-09-30 2016-05-09 2016-10-30 2016-10-13 2016-12-04 2016-12-09 2017-06-02 du contrat de ville de Kumba Management Selection CM-MINHDU-122440-CS- CQS / Etudes techniques (APS/APD), et production de Dossier d’Appel d’Offres(DAO) Improving Connectivity and Consultant en vue de la réalisation de IDA / V0100 Living environment in Post Qualification Open - National 155,000.00 144,470.34 Signed 2016-02-15 2016-03-07 2016-03-07 2016-04-20 2016-03-28 2016-05-20 2016-05-03 2016-06-24 2016-05-31 2016-12-21 travaux de voiries et Beneficiary Cities Selection équipements structurants dans les villes de Kumba, Batouri et Ngaoundéré CM-MINHDU-122443-CS- CQS / Etudes techniques (APS/APD), et production de Improving Connectivity and Consultant Dossier d’Appel d’Offres(DAO) IDA / V0100 Living environment in Post Qualification Open - National 150,000.00 135,517.80 Signed 2016-02-15 2016-02-15 2016-03-07 2016-04-20 2016-04-13 2016-05-20 2016-05-23 2016-06-24 2016-07-12 2016-12-21 en vue de la réalisation de Beneficiary Cities Selection travaux de voiries structurants dans les arrondissements de Yaoundé 5ème et 7ème. CM-MINHDU-123791-CS- CQS / Sélection d’un Project Management, Consultant Consultant Firme pour IDA / V0100 Coordination, Monitoring and Post Qualification Open - National 18,000.00 18,503.23 Signed 2016-03-20 2016-02-02 2016-04-10 2016-05-24 2016-04-04 2016-06-23 2016-06-30 2016-07-28 2016-07-27 2017-01-24 l’élaboration du Cadre de Evaluation Selection Politique de Recasement du PDVI. CM-MINHDU-91524-CS-CQS / Elaboration des plans de Strengthening Capacity for Consultant secteur et enquêtes IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 250,000.00 0.00 Canceled 2019-08-30 2019-09-27 2019-11-22 2019-12-27 2020-01-24 2020-10-20 parcellaires dans les zones Management Selection cibles de N'Gaoundéré, Kumba et Batouri Page 5 CM-MINHDU-118420-CS- QCBS / Contrôle et Project Management, surveillance pour la réalisation Quality And Cost- IDA / 61320 Coordination, Monitoring and Prior Open - National 587,953.00 591,949.14 Signed 2020-01-15 2019-11-15 2020-01-16 2019-12-06 2020-02-29 2020-04-02 2020-03-28 2020-05-28 2020-04-27 2020-09-03 2020-06-01 2020-11-19 2020-07-06 2020-12-08 2022-06-26 des travaux de voiries Based Selection Evaluation structurantes dans la ville de Ngaoundéré CM-MINHDU-91528-CS- QCBS / Développement d'un outil de programmation et de gestion de l'entretien des VRD en 02 missions séparées: Strengthening Capacity for Quality And Cost- Mission 01- Développement IDA / 61320 Inclusive and Resilient Urban Prior Open - International 1,000,000.00 0.00 Canceled 2019-11-03 2019-12-01 2020-02-09 2020-03-10 2020-05-05 2020-07-02 2020-07-30 2021-04-26 Based Selection d'un outil de programmation Management et de gestion de l'entretien des VRD à Yaoundé, Mission 02-Développement d'un outil etc CM-MINHDU-94779-CS- QCBS / Mairies d'œuvre Improving Connectivity and complète pour la réalisation Quality And Cost- IDA / 61320 Living environment in Post Open - National 388,764.00 0.00 Canceled 2019-05-14 2019-06-11 2019-08-22 2019-09-21 2019-11-02 2019-12-28 2020-02-01 2022-03-22 des travaux de voiries et Based Selection Beneficiary Cities d'équipements de proximité dans la ville de Maroua CM-MINHDU-91547-CS-CQS / Etude stratégique sur la Strengthening Capacity for Consultant programmation et la gestion IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - International 250,000.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2022-02-13 des investissements du Management Selection MINHDU financés par le BIP CM-MINHDU-91538-CS- QCBS / Appui à l'actualisation Strengthening Capacity for Quality And Cost- de l'adressage et à la mise en IDA / 61320 Inclusive and Resilient Urban Post Open - International 250,000.00 0.00 Canceled 2020-01-02 2020-01-30 2020-03-26 2020-04-25 2020-06-06 2020-07-20 2020-08-17 2021-02-13 Based Selection place d'un applicatif fiscal à Management Yaoundé CM-MINHDU-91542-CS- QCBS / Inventaire pour la Strengthening Capacity for programmation des Quality And Cost- IDA / 61320 Inclusive and Resilient Urban Prior Open - International 433,334.00 0.00 Canceled 2020-01-02 2020-01-30 2020-04-09 2020-05-09 2020-07-04 2020-08-31 2020-09-28 2021-03-27 équipements marchands à Based Selection Management Yaoundé, Kumba, et Ngaoundére CM-MINHDU-91536-CS-CQS / Valorisation de l'étude "état des lieux des équipements Strengthening Capacity for Consultant marchands" dans l'objectif IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 166,666.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2020-08-22 d'une programmation Management Selection raisonnée des interventions et des améliorations de gestion à Douala CM-MINHDU-91560-CS-CQS / Etude sur les méthodes Strengthening Capacity for Consultant d'aménagement concerté en IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 166,666.00 0.00 Canceled 2019-10-03 2019-10-31 2019-12-26 2020-01-30 2020-02-27 2020-11-23 zone urbaine dense et dans Management Selection les zones d'extension urbaine CM-MINHDU-91520-CS- QCBS / Elaboration du plan de Strengthening Capacity for Quality And Cost- secteur dans les Communes IDA / 61320 Inclusive and Resilient Urban Post Open - National 400,000.00 0.00 Canceled 2020-09-30 2020-11-21 2020-10-28 2020-12-23 2021-01-22 2021-03-05 2021-04-18 2021-05-16 2022-02-10 Based Selection d'Arrondissement de Yaoundé Management 5ème et 7ème CM-MINHDU-91491-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant pour la réalisation des travaux IDA / 61320 Living environment in Post Qualification Open - National 155,351.00 0.00 Canceled 2019-07-17 2019-08-14 2019-09-27 2019-11-08 2019-12-13 2022-04-01 de voiries et d'équipements Beneficiary Cities Selection de proximité de Kumba CM-MINHDU-91533-CS-CQS / Evaluation de l'opération fichiers des contribuables Strengthening Capacity for Consultant réalisée par le PDUE dans les IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - International 166,666.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2020-08-22 6 Communes Management Selection d'Arrondissement de Douala et développement d'un applicatif fiscal de l'adressage CM-MINHDU-91511-CS- QCBS / Elaboration des plans de secteur en 03 missions séparées: Mission 01- Elaboration du plan de secteur Strengthening Capacity for Quality And Cost- dans les Communes IDA / 61320 Inclusive and Resilient Urban Prior Open - International 783,334.00 0.00 Canceled 2019-08-30 2019-09-27 2019-12-06 2020-01-05 2020-03-01 2020-04-28 2020-05-26 2021-02-20 Based Selection d'Arrondissement de Douala Management 3ème et 5ème Mission 02- Elaboration du plan de secteur autour de l'ENSET à Kumba, Mission 3- etc CM-MINHDU-169825-CS- CQS / Maîtrise d’œuvre Improving Connectivity and Consultant complète pour la réalisation Under IDA / 61320 Living environment in Post Qualification Open - National 85,645.00 0.00 2020-06-25 2021-01-13 2020-07-16 2020-08-29 2020-09-28 2020-11-02 2022-06-25 travaux de voiries et Implementation Beneficiary Cities Selection d’équipements de proximité dans la ville de Kousseri CM-MINHDU-143813-CS- QCBS / Maîtrise d’œuvre Improving Connectivity and complète pour la réalisation Quality And Cost- Under IDA / 61320 Living environment in Post Open - National 544,964.00 0.00 2020-05-25 2020-05-26 2020-06-15 2020-06-16 2020-07-29 2021-03-08 2020-08-26 2021-05-05 2020-09-25 2020-10-30 2020-12-04 2022-05-28 des travaux de voiries et Based Selection Implementation Beneficiary Cities d’équipements de proximité à Yaoundé 5ème et 7ème CM-MINHDU-91451-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant pour la réalisation des travaux IDA / 61320 Living environment in Post Qualification Open - National 199,629.00 191,823.43 Signed 2020-06-20 2020-06-09 2020-07-18 2020-08-31 2020-12-24 2020-10-12 2021-01-14 2020-11-16 2021-02-22 2023-05-05 de voiries et d'équipements Beneficiary Cities Selection de proximité à Ngaounderé Page 6 CM-MINHDU-91386-CS- QCBS / Contrôle et Improving Connectivity and Quality And Cost- surveillance des travaux de IDA / 61320 Living environment in Post Open - National 464,908.00 0.00 Canceled 2020-02-20 2020-03-19 2020-05-30 2020-06-29 2020-08-10 2020-10-05 2020-11-09 2022-03-04 Based Selection voiries structurants dans la Beneficiary Cities ville de Kumba CM-MINHDU-91437-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant pour la réalisation des travaux IDA / 61320 Living environment in Post Qualification Open - National 108,735.00 136,975.50 Signed 2020-08-31 2020-06-09 2020-09-28 2020-11-27 2020-12-24 2021-01-08 2021-01-14 2021-02-12 2021-01-25 2023-07-02 de voiries et d'équipements Beneficiary Cities Selection de proximité dans la ville de Batouri CM-MINHDU-91474-CS-CQS / Recrutement d'un consultant Improving Connectivity and Consultant (firme) pour la réalisation des IDA / 61320 Living environment in Post Qualification Open - National 61,658.00 0.00 Canceled 2020-01-28 2020-02-25 2020-04-21 2020-05-05 2020-05-26 2021-01-21 EIES et PAR des sous projets Beneficiary Cities Selection de proximité dans la ville de Douala CM-MINHDU-179938-CS- CQS / Réalisation des études techniques des sous-projets Improving Connectivity and Consultant pilotes pour l'amélioration de IDA / 61320 Living environment in Post Qualification Open - National 52,202.00 61,283.04 Signed 2018-04-04 2018-01-26 2018-04-25 2018-06-08 2018-03-13 2018-07-08 2018-04-27 2018-08-12 2019-11-07 2019-02-08 la mobilité piétonne dans Beneficiary Cities Selection certains quartiers de la ville de Yaoundé CM-MINHDU-179147-CS- CQS / Recrutement d’un Strengthening Capacity for consultant pour l’élaboration Quality And Cost- Under IDA / 61320 Inclusive and Resilient Urban Post Open - International 450,000.00 0.00 2020-10-01 2020-11-18 2020-10-22 2020-12-04 2020-12-05 2021-01-02 2021-02-01 2021-03-08 2021-04-12 2022-04-12 des plans de secteur (PS) à Based Selection Implementation Management Douala 3 (Ndogpassi) et Douala 5 (Beedi) CM-MINHDU-179149-CS- CQS / Recrutement d’un Strengthening Capacity for consultant pour l’élaboration Quality And Cost- Under IDA / 61320 Inclusive and Resilient Urban Post Open - International 380,000.00 0.00 2020-10-01 2020-11-18 2020-10-22 2020-12-04 2020-12-05 2021-01-02 2021-02-01 2021-03-08 2021-04-12 2022-04-12 des plans de secteur (PS) à Based Selection Implementation Management Yaoundé 5 (Nkolmessen) et Yaoundé 7 (Oyom abang) CM-MINHDU-91725-CS- QCBS / Recrutement d'un Project Management, Quality And Cost- consultant (firme) chargé de IDA / 61320 Coordination, Monitoring and Prior Open - International 1,520,000.00 0.00 Canceled 2020-08-15 2020-09-12 2020-11-21 2020-12-21 2021-02-15 2021-04-14 2021-05-12 2024-04-26 Based Selection l'assistance à maitrise Evaluation d'ouvrage auprès des CTD CM-MINHDU-91720-CS-CQS Project Management, Consultant / Recrutement d'un consultant Pending IDA / 61320 Coordination, Monitoring and Post Qualification Open - National 50,000.00 0.00 2022-07-12 2022-08-09 2022-09-20 2022-10-11 2022-11-01 2023-04-30 (firme) pour l'audit technique Implementation Evaluation Selection des activités du PDVIR CM-MINHDU-206619-CS- CQS / Recrutement d'un Improving Connectivity and Consultant consultant(firme) pour la Under IDA / 61320 Living environment in Post Qualification Open - National 34,260.00 0.00 2021-03-10 2021-03-03 2021-03-31 2021-05-26 2021-05-06 2021-05-21 2021-06-14 2021-06-15 réalisation des PAR des sous Implementation Beneficiary Cities Selection projets de proximité dans la ville de Yaoundé CM-MINHDU-215990-CS- CQS / Réalisation de l'EIES Improving Connectivity and Consultant des travaux pilotes pour la Under IDA / 61320 Living environment in Post Qualification Open - National 17,129.00 0.00 2021-03-25 2021-02-27 2021-04-15 2021-05-29 2021-06-28 2021-08-02 2022-01-29 mobilité piétonne dans Implementation Beneficiary Cities Selection certains quartiers de la ville de Yaoundé CM-MINHDU-215993-CS- CQS / Réalisation du PAR des Improving Connectivity and Consultant travaux pilotes pour la Under IDA / 61320 Living environment in Post Qualification Open - National 30,832.00 0.00 2021-02-26 2021-02-26 2021-03-19 2021-05-02 2021-06-01 2021-07-06 2022-01-02 mobilité piétonne dans Implementation Beneficiary Cities Selection certains quartiers de la ville de Yaoundé CM-MINHDU-213480-CS- CQS / Recrutement d'un Improving Connectivity and Consultant consultant pour la réalisation Under IDA / 61320 Living environment in Post Qualification Open - National 17,153.00 0.00 2021-04-12 2021-03-26 2021-04-14 2021-05-14 2021-05-29 2021-06-15 2021-10-13 des EIES des sous projets de Implementation Beneficiary Cities Selection proximité dans les villes de Kousséri et Maroua CM-MINHDU-212905-CS- CQS / Sélection d’un Improving Connectivity and Consultant consultant pour l’élaboration Under IDA / 61320 Living environment in Post Qualification Open - National 24,014.00 0.00 2021-04-07 2021-03-03 2021-04-28 2021-05-27 2021-06-11 2021-07-04 2021-12-31 des PAR des sous projets de Implementation Beneficiary Cities Selection proximité dans les villes de Batouri et Ngaoundéré CM-MINHDU-213479-CS- CQS / Sélection d'un Strengthening Capacity for Consultant Consultant pour la réalisation Under IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 25,694.00 0.00 2021-04-05 2021-03-03 2021-04-26 2021-04-28 2021-05-25 2021-06-09 2021-07-02 2021-12-29 des PAR des sous-projets de Implementation Management Selection proximité dans les villes de Douala 3è et 5è CM-MINHDU-94781-CS-CQS / Recrutement d'un consultant Improving Connectivity and Consultant (firme) pour la réalisation des Under IDA / 61320 Living environment in Post Qualification Open - National 24,014.00 0.00 2021-09-30 2021-03-03 2021-10-28 2021-12-23 2022-01-22 2022-02-19 2022-08-18 PAR des sous projets de Implementation Beneficiary Cities Selection proximité dans les villes de Kousserie et Maroua CM-MINHDU-91466-CS-CQS / Recrutement d'un Improving Connectivity and Consultant consultant(firme) pour la IDA / 61320 Living environment in Post Qualification Open - National 61,658.00 0.00 Canceled 2020-06-10 2020-07-08 2020-09-02 2020-09-23 2020-10-14 2021-06-11 réalisation des EIES et PAR des Beneficiary Cities Selection sous projets de proximité dans la ville de Yaoundé CM-MINHDU-169915-CS- CQS / Recrutement d'un Improving Connectivity and Consultant consultant (firme) pour la IDA / 61320 Living environment in Post Qualification Open - National 34,258.00 0.00 Canceled 2020-06-30 2020-07-21 2020-09-03 2020-10-03 2020-11-07 2021-05-06 réalisation des EIES et PAR des Beneficiary Cities Selection sous projets de proximité Kousséri Page 7 CM-MINHDU-91868-GO-RFB Strengthening Capacity for / mise en place d'un système Quality And Cost- Pending IDA / 61320 Inclusive and Resilient Urban Post Open - International 257,289.00 0.00 2021-07-12 2021-08-02 2021-09-15 2021-10-13 2021-11-12 2021-12-17 2022-01-21 2023-01-21 d'archivage électronique à la Based Selection Implementation Management DOU CM-MINHDU-179199-CS- CQS / Recrutement d’un consultant pour le Strengthening Capacity for Quality And Cost- développement d'un outil de IDA / 61320 Inclusive and Resilient Urban Post Open - International 475,000.00 0.00 Canceled 2020-09-15 2020-10-06 2020-11-19 2020-12-17 2021-01-16 2021-02-20 2021-03-27 2022-03-27 Based Selection programmation et de gestion Management de l'entretien des VRD à Douala CM-MINHDU-91541-CS- QCBS / Appui à l'amélioration Strengthening Capacity for de la programmation et de la Quality And Cost- Pending IDA / 61320 Inclusive and Resilient Urban Post Open - International 666,666.00 0.00 2021-12-20 2022-01-17 2022-03-28 2022-04-27 2022-06-22 2022-08-19 2022-09-16 2023-03-15 réalisation du budget à Based Selection Implementation Management Douala, Yaoundé, Ngaoundere et Kumba CM-MINHDU-91498-CS-CQS / Recrutement d’un consultant pour l’actualisation Improving Connectivity and Consultant Pending des PGES des sous projets de IDA / 61320 Living environment in Post Qualification Open - National 51,388.00 0.00 2021-05-31 2021-06-28 2021-08-23 2021-09-13 2021-10-11 2022-06-08 Implementation proximité dans les villes de Beneficiary Cities Selection Batouri, Douala, Ngaoundéré et Yaoundé . CM-MINHDU-212759-CS- QCBS / Recrutement d'un consultant pour Strengthening Capacity for l'assainissement des comptes Quality And Cost- IDA / 61320 Inclusive and Resilient Urban Post Open - National 351,629.00 0.00 Canceled 2021-04-08 2021-04-29 2021-06-12 2021-07-10 2021-07-31 2021-08-29 2021-09-27 2022-03-26 des communes des ville Based Selection Management Batouri, Douala, Ngaoundéré, Yaoundé et Kousséri dans le cadre du PDVIR CM-MINHDU-214526-CS- CQS / Recrutement d'un consultant pour la réalisation Strengthening Capacity for Consultant de l'étude sur les méthodes IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 171,291.00 0.00 Canceled 2021-05-10 2021-05-11 2021-05-31 2021-06-15 2021-06-30 2021-07-23 2022-01-19 d'aménagement concerté en Management Selection zone urbaine dense et dans les zones d'extension urbaine CM-MINHDU-169848-CS- Strengthening Capacity for Consultant CQS / Appui à la préparation IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 53,956.00 0.00 Canceled 2020-06-15 2020-06-30 2020-07-06 2020-08-19 2020-12-10 2020-09-18 2021-04-13 2020-10-23 2021-04-21 des contrats de ville de Management Selection Maroua et Kousséri CM-MINHDU-179152-CS- CQS / Recrutement d’un consultant (firme) pour l’élaboration du Plan d’Organisation et Strengthening Capacity for Consultant d’Optimisation des Effectifs IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 222,678.00 0.00 Canceled 2020-10-01 2021-05-12 2020-10-22 2020-12-05 2021-01-04 2021-02-08 2021-05-09 (POE) de la CU de Ndéré; des Management Selection CA de Dla III, Dla V, Ydé V, Ydé VII, Mroua I, Ndéré des communes de Kousséri et Batouri CM-MINHDU-143812-CS- CQS / Maîtrise d’œuvre Improving Connectivity and Consultant complète pour la réalisation IDA / 61320 Living environment in Post Qualification Open - National 214,113.00 0.00 Canceled 2020-01-20 2020-06-29 2020-02-10 2020-03-25 2020-12-11 2020-04-24 2020-11-23 2020-05-29 2021-11-20 travaux de voiries et Beneficiary Cities Selection d’équipements de proximité dans la ville de Maroua CM-MINHDU-236635-CS- QCBS / Recrutement d’un consultant (firme) pour l’élaboration du Plan d’Organisation et Strengthening Capacity for Quality And Cost- Pending d’Optimisation des Effectifs IDA / 61320 Inclusive and Resilient Urban Post Open - National 308,324.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2022-07-08 Based Selection Implementation (POE) de la CU de Ndéré; des Management CA de Dla III, Dla V, Ydé V, Ydé VII, Mroua I, Ndéré des communes de Kousséri et Batouri CM-MINHDU-236634-CS- QCBS / Recrutement d'un consultant pour la réalisation Strengthening Capacity for Quality And Cost- Pending de l'étude sur les méthodes IDA / 61320 Inclusive and Resilient Urban Post Open - International 256,937.00 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2022-11-05 Based Selection Implementation d'aménagement concerté en Management zone urbaine dense et dans les zones d'extension urbaine CM-MINHDU-236426-CS- Strengthening Capacity for Consultant CQS / Appui à la préparation Under IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 102,915.00 0.00 2020-06-15 2020-07-07 2020-12-10 2020-12-22 2021-01-26 2021-08-09 des contrats de ville de Implementation Management Selection Maroua et Kousséri CM-MINHDU-236165-CS- CQS / Maîtrise d’œuvre Improving Connectivity and Consultant complète pour la réalisation Under IDA / 61320 Living environment in Post Qualification Open - National 446,219.00 0.00 2020-01-20 2020-06-29 2020-07-07 2020-09-22 2020-11-23 2021-09-10 2023-04-18 travaux de voiries et Implementation Beneficiary Cities Selection d’équipements de proximité dans la ville de Maroua CM-MINHDU-237968-CS- CQS / Appui au PDVIR dans la mise en œuvre du plan d'actions de prévention et Improving Connectivity and Consultant Under d’atténuation des VBG, des IDA / 61320 Living environment in Post Qualification Open - National 146,692.00 0.00 2021-01-13 2020-09-17 2021-02-03 2021-03-19 2021-01-11 2021-04-18 2021-05-23 2022-01-18 Implementation VCE et des EAS, dans sept Beneficiary Cities Selection villes (Batouri, Douala, Kousséri, Kumba, Maroua, Ngaoundéré et Yaoundé CM-MINHDU-179413-CS- CQS / Recrutement d'un consultant (ONG) spécialisée Improving Connectivity and Consultant VBG pour appuyer la Cellule IDA / 61320 Living environment in Post Qualification Open - National 123,330.00 0.00 Canceled 2020-10-01 2021-01-13 2020-10-22 2020-12-05 2021-01-11 2021-01-04 2021-02-08 2021-08-07 de Coordination du Projet Beneficiary Cities Selection dans la préparation et la mise en oeuvre des activités de VBG. Page 8 CM-MINHDU-179179-CS- CQS / Recrutement d'un consultant pour la réalisation de l'Etude de faisabilité de la mise en place des outils et Strengthening Capacity for Consultant Pending méthodes en vue de IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 137,000.00 0.00 2021-07-30 2021-08-20 2021-10-03 2021-11-02 2021-12-07 2022-04-06 Implementation l’optimisation du rendement Management Selection des recettes de la Communauté urbaine et des Communes d’arrondissement de Ngaoundéré CM-MINHDU-179208-CS- CQS / Recrutement d’un consultant pour le Strengthening Capacity for Quality And Cost- Pending développement d'un outil de IDA / 61320 Inclusive and Resilient Urban Post Open - International 513,874.00 0.00 2020-09-25 2020-10-16 2020-11-29 2020-12-27 2021-01-26 2021-03-02 2021-04-06 2022-04-06 Based Selection Implementation programmation et de gestion Management de l'entretien des VRD à Douala CM-MINHDU-212750-CS- QCBS / Sélection d'un consultant pour l'élaboration Strengthening Capacity for des schémas directeurs des Quality And Cost- Pending IDA / 61320 Inclusive and Resilient Urban Post Open - National 334,476.00 0.00 2021-04-09 2021-04-30 2021-05-29 2021-06-26 2021-06-27 2021-08-01 2021-08-30 2022-01-27 équipements marchands des Based Selection Implementation Management villes de Ngaoundéré et Yaoundé dans le cadre du PDVIR CM-MINHDU-238083-CS- CQS / Étude de faisabilité de deux applicatifs de Strengthening Capacity for Consultant Pending l’adressage de Yaoundé IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 128,468.27 0.00 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-03-07 Implementation (gestion des taxes et gestion Management Selection des travaux sur les Voiries et Réseaux Divers) CM-MINHDU-212755-CS- CQS / Recrutement d'un consultant en vue de Strengthening Capacity for Consultant l'élaboration du schéma IDA / 61320 Inclusive and Resilient Urban Post Qualification Open - National 171,526.00 0.00 Canceled 2021-05-31 2021-06-21 2021-07-26 2021-08-10 2021-08-28 2021-12-26 directeur des marchés et des Management Selection pôles commerciaux de la ville de Douala. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11672-CS- INDV / Recrutement de l'évaluateur externe pour la Project Management, Individual mise en œuvre des PAR dans IDA / V0100 Coordination, Monitoring and Post Consultant Limited 8,347.00 0.00 Canceled 2017-10-15 2017-10-20 2017-11-10 2017-12-04 2018-01-03 les villes de Yaoundé, Douala, Evaluation Selection Batouri, Kumba et Ngaoundéré. CM-MINHDU-11666-CS- INDV / Recrutement d'un Project Management, Individual consultant formateur dans le IDA / V0100 Coordination, Monitoring and Post Consultant Limited 13,912.00 0.00 Canceled 2017-05-15 2017-05-20 2017-05-30 2017-06-19 2017-07-19 cadre de l'atelier itinérant sur Evaluation Selection la note méthodologique CCE dans les 5 villes CM-MINHDU-17030-CS-CDS / Recrutement d'un consultant individuel pour l'étude Improving Connectivity and d'optimisation du design IDA / V0100 Living environment in Post Direct Selection Direct 23,850.00 0.00 Canceled 2017-06-06 2017-06-16 2017-08-20 2017-11-18 technique de la station de Beneficiary Cities traitement des boues de vidange de Ngombè CM-MINHDU-17131-CS- INDV / Recrutement d'un Project Management, Individual consultant formateur dans le IDA / V0100 Coordination, Monitoring and Post Consultant Limited 13,912.00 0.00 Canceled 2017-10-15 2017-10-20 2017-11-10 2017-12-15 2017-12-20 cadre de l'atelier itinérant sur Evaluation Selection la note méthodologique CCE dans les 5 villes CM-MINHDU-11761-CS- Project Management, Individual INDV / Recrutement d'un IDA / V0100 Coordination, Monitoring and Prior Consultant Open 26,831.00 0.00 Canceled 2017-08-31 2017-10-19 2017-10-29 2017-11-18 2018-11-18 Spécialiste en développement Evaluation Selection social au sein de la CP/PDVI CM-MINHDU-17144-CS- INDV / Recrutement d'un Project Management, Individual spécialiste en développement IDA / V0100 Coordination, Monitoring and Prior Consultant Open 37,857.00 0.00 Canceled 2017-07-31 2017-09-18 2017-10-09 2017-11-13 2018-11-13 municipal au sein de la Evaluation Selection CC/PDVI CM-MINHDU-17147-CS- Project Management, Individual INDV / Recrutement d'un IDA / V0100 Coordination, Monitoring and Prior Consultant Open 37,857.00 0.00 Canceled 2017-07-31 2017-09-18 2017-10-09 2017-11-13 2018-11-13 auditeur interne au sein de la Evaluation Selection CC/PDVI CM-MINHDU-11759-CS-CDS Project Management, / Contrat du Responsable IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-15 2017-09-30 environnemental et social du Evaluation PDVI CM-MINHDU-91716-CS- Project Management, Individual INDV / Recrutement de IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,528.00 27,320.07 Signed 2019-08-30 2019-10-10 2019-10-25 2020-04-14 2019-11-22 2020-05-13 2019-12-06 2020-06-22 2020-12-05 l'auditeur interne de la Evaluation Selection CC/PDVIR CM-MINHDU-91718-CS- Project Management, Individual INDV / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Consultant Open 24,635.00 27,403.58 Signed 2019-08-30 2019-10-11 2019-10-25 2020-04-15 2019-11-22 2020-05-14 2019-12-06 2020-06-18 2020-12-05 Spécialiste en développement Evaluation Selection social au sein de la CC/PDVIR Page 9 CM-MINHDU-11743-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 59,151.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-20 2017-11-16 Coordonnateur du PDVI Evaluation CM-MINHDU-27471-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 59,192.00 0.00 Canceled 2017-09-06 2017-09-16 2017-10-03 2018-06-30 coordonnateur du PDVIR Evaluation CM-MINHDU-27476-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 responsable environnemental Evaluation et social du PDVIR CM-MINHDU-27473-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 30,286.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 Responsable administratif et Evaluation financier du PDVIR CM-MINHDU-27477-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-03-26 Responsable de Passation des Evaluation marchés du PDVIR CM-MINHDU-11757-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-04-05 2017-04-25 2017-04-15 2017-05-15 2017-09-30 Comptable du PDVI Evaluation CM-MINHDU-11748-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 20,190.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-15 2017-09-30 Responsable Administratif et Evaluation Financier du PDVI CM-MINHDU-27475-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 Comptable du PDVIR Evaluation CM-MINHDU-27480-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 chauffeur 2 au sein du PDVIR Evaluation CM-MINHDU-27483-CS-CDS Project Management, / Avenant au contrat d'un IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 agent d'entretien 1 au sein du Evaluation PDVIR CM-MINHDU-27481-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 5,679.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 Chauffeur 3 au sein du PDVIR Evaluation CM-MINHDU-27485-CS-CDS Project Management, / Avenant au contrat d'un IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 agent d'entretien 2 au sein du Evaluation PDVIR CM-MINHDU-27479-CS-CDS Project Management, / Avenant au contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-03-26 chauffeur 1 au sein du PDVIR Evaluation CM-MINHDU-27478-CS-CDS Project Management, / Avenant au contrat de IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 9,464.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 l'Assistant administratif et Evaluation financier du PDVIR CM-MINHDU-12004-CS-CDS Project Management, / Avenant au Contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 5,679.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 Chauffeur 3 au sein du PDVI Evaluation CM-MINHDU-12001-CS-CDS Project Management, / Avenant au Contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 Chauffeur 1 au sein du PDVI Evaluation CM-MINHDU-12003-CS-CDS Project Management, / Avenant au Contrat du IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 Chauffeur 2 au sein du PDVI Evaluation CM-MINHDU-11998-CS-CDS Project Management, / Avenant au Contrat de IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 9,464.00 0.00 Canceled 2017-04-06 2017-04-18 2017-04-16 2017-05-16 2017-09-30 l'Assistant Administratif et Evaluation financier du PDVI CM-MINHDU-12005-CS-CDS Project Management, / Avenant au contrat d'un IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 agent 1 d'entretien Evaluation CM-MINHDU-12012-CS-CDS Project Management, / Avenant au Contrat d'un IDA / V0100 Coordination, Monitoring and Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 agent 2 d'entretien Evaluation CM-MINHDU-111502-CS- Project Management, Individual INDV / Recrutement du IDA / 61320 Coordination, Monitoring and Post Consultant Open 43,200.00 40,980.09 Signed 2019-04-22 2019-03-18 2019-06-10 2019-05-17 2019-07-01 2019-05-21 2019-08-05 2019-05-28 2020-08-04 Responsable en Passation des Evaluation Selection marchés de la CC/PDVIR CM-MINHDU-116139-CS- INDV / Recrutement d'un Project Management, Individual Responsable en IDA / 61320 Coordination, Monitoring and Post Consultant Open 37,857.00 48,584.27 Signed 2019-05-27 2020-09-24 2019-07-29 2020-06-01 2019-08-19 2020-06-05 2019-09-23 2020-07-07 2020-09-22 Développement Municipal au Evaluation Selection sein de la CC/PDVIR CM-MINHDU-116141-CS- CDS / Recrutement d'un Project Management, Responsable Administratif et IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 45,036.00 47,637.22 Signed 2019-05-23 2019-04-29 2019-06-11 2019-05-14 2019-08-15 2019-05-22 2020-08-14 Financier au sein de la Evaluation CC/PDVIR CM-MINHDU-116347-CS- Project Management, CDS / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 27,210.00 27,199.24 Signed 2019-05-23 2019-05-02 2019-06-11 2019-05-06 2019-08-15 2019-05-22 2020-08-14 Comptable au sein de la Evaluation CC/PDVIR Page 10 CM-MINHDU-116759-CS- Project Management, CDS / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 167,800.00 169,626.80 Signed 2019-05-31 2019-05-02 2019-06-10 2019-05-17 2019-08-14 2019-05-22 2021-08-13 Coordonnateur à la CC/PDVIR Evaluation CM-MINHDU-123018-CS- INDV / Recrutement d’un Improving Connectivity and Individual consultant individuel chargé IDA / V0100 Living environment in Post Consultant Open 18,000.00 20,005.88 Signed 2016-01-23 2016-07-29 2016-03-12 2016-11-01 2016-04-02 2016-11-23 2016-05-07 2017-01-05 2016-11-03 de l’analyse économique du Beneficiary Cities Selection PDVI. CM-MINHDU-91719-CS- Project Management, Individual INDV / Recrutement de IDA / 61320 Coordination, Monitoring and Post Consultant Open 13,051.00 16,481.41 Signed 2019-11-10 2019-11-22 2020-01-05 2020-11-30 2020-01-19 2020-12-29 2020-02-02 2021-01-06 2021-02-01 l'assistant au responsable en Evaluation Selection suivi évaluation CM-MINHDU-91712-CS- INDV / Recrutement d'un Project Management, Individual consultant individuel pour la IDA / 61320 Coordination, Monitoring and Post Consultant Open 33,335.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-11-21 conception, mise en ligne, Evaluation Selection administration du site web du Projet CM-MINHDU-91713-CS- INDV / Recrutement d'un Project Management, Individual consultant individuel pour IDA / 61320 Coordination, Monitoring and Post Consultant Open 33,335.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-11-21 appui à la communication Evaluation Selection dans les CTD de ressort du PDVIR et à la CC/PDVIR CM-MINHDU-91561-CS- INDV / Recrutement d'un Consultant individuel chargé de l'appui à l'élaboration du Strengthening Capacity for Individual bilan de 15 ans de IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 33,334.00 0.00 Canceled 2019-09-30 2019-11-25 2019-12-09 2019-12-23 2020-06-20 contractualisation Etat-villes, Management Selection y compris l'élaboration d'une stratégie d'intervention et d'un guide méthodologique. CM-MINHDU-91717-CS- INDV / Recrutement d'un Project Management, Individual spécialiste en développement IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,528.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-22 2019-12-06 2020-12-05 municipal au sein de la Evaluation Selection CC/PDVIR CM-MINHDU-94783-CS- INDV / Etude de programmation des travaux Improving Connectivity and Individual d'amélioration de l'accès aux IDA / 61320 Living environment in Post Consultant Open 68,539.00 0.00 Canceled 2019-05-31 2019-08-09 2019-08-30 2019-09-27 2020-01-25 services de base dans certains Beneficiary Cities Selection quartiers dans la ville de kousseri CM-MINHDU-91803-CS- Strengthening Capacity for Individual INDV / modes de gestion et IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 entretien des ouvrages Management Selection communautaires CM-MINHDU-91456-CS- INDV / Contrôle et surveillance pour la réalisation Improving Connectivity and Individual des travaux de plantation IDA / 61320 Living environment in Post Consultant Open 49,046.00 0.00 Canceled 2020-05-29 2020-07-17 2020-08-07 2020-09-11 2022-10-01 d'arbres dans les Beneficiary Cities Selection arrondissements de Douala 3e et 5e CM-MINHDU-91802-CS- Strengthening Capacity for Individual INDV / tenue des livres IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 comptables et suivi des Management Selection dépenses communautaires, CM-MINHDU-91804-CS- INDV / formation des personnels des services Strengthening Capacity for Individual financiers des communes IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 46,248.00 0.00 Canceled 2019-08-30 2019-11-22 2019-12-22 2020-01-12 2020-07-10 impliquées dans la mise en Management Selection œuvre du PDVIR en finances locales, comptabilité et fiscalité CM-MINHDU-91801-CS- INDV / la communication sociale: gestion des sources, Strengthening Capacity for Individual canaux et type d'informations, IDA / 61320 Inclusive and Resilient Urban Post Consultant Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 évaluation des enjeux et Management Selection impacts de l'information sur les populations CM-MINHDU-139682-CS- INDV / Recrutement d'un Project Management, Individual Under Conseiller Principal à la IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,626.00 0.00 2019-11-20 2021-01-13 2020-01-08 2020-01-29 2020-03-04 2020-08-31 Implementation Cellule de Coordination du Evaluation Selection PDVIR CM-MINHDU-139683-CS- INDV / Recrutement d'un Project Management, Individual Ingénieur de Génie Civil à la IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,626.00 41,084.57 Signed 2019-11-20 2019-10-22 2020-01-08 2020-03-02 2020-01-29 2020-04-17 2020-03-04 2020-06-18 2020-08-31 Cellule de Coordination du Evaluation Selection PDVIR CM-MINHDU-139685-CS- Project Management, Individual INDV / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Consultant Open 32,626.00 34,026.65 Signed 2019-11-20 2019-10-22 2020-01-08 2020-03-02 2020-01-29 2020-04-17 2020-03-04 2020-06-18 2020-08-31 Responsable en Gestion Evaluation Selection Environnementale CM-MINHDU-139689-CS- INDV / Recrutement d'un Project Management, Individual Assistant en Passation des IDA / 61320 Coordination, Monitoring and Post Consultant Open 21,751.00 20,552.67 Signed 2019-11-20 2019-12-04 2020-01-08 2020-06-16 2020-01-29 2020-06-22 2020-03-04 2020-08-20 2020-08-31 marchés à la Cellule de Evaluation Selection Coordination du PDVIR Page 11 CM-MINHDU-139693-CS- INDV / Recrutement d'un Project Management, Individual Assistant Administratif et IDA / 61320 Coordination, Monitoring and Post Consultant Open 10,875.00 16,481.41 Signed 2019-11-20 2019-12-18 2020-01-08 2020-11-30 2020-01-29 2020-12-29 2020-03-04 2021-01-06 2021-02-27 Financier à la Cellule de Evaluation Selection Coordination du PDVIR CM-MINHDU-139702-CS- INDV / Recrutement d'un Project Management, Individual Assistant des Responsables de IDA / 61320 Coordination, Monitoring and Post Consultant Open 10,875.00 17,070.03 Signed 2019-11-20 2019-11-22 2020-01-08 2020-11-30 2020-01-29 2020-11-30 2020-03-04 2021-01-06 2021-02-27 gestion environnementale et Evaluation Selection sociale au sein de la Cellule de Coordination du PDVIR CM-MINHDU-139706-CS- INDV / Recrutement d'une Project Management, Individual Assistante de projet au sein IDA / 61320 Coordination, Monitoring and Post Consultant Open 10,875.00 14,126.93 Signed 2019-11-20 2020-07-14 2020-01-08 2020-11-30 2020-01-29 2020-12-30 2020-03-04 2021-01-06 2021-02-27 de la Cellule de Coordination Evaluation Selection du PDVIR CM-MINHDU-139707-CS- Project Management, Individual INDV / Recrutement d'une IDA / 61320 Coordination, Monitoring and Post Consultant Open 8,700.00 11,493.21 Signed 2019-11-20 2019-11-22 2020-01-08 2020-06-30 2020-01-29 2020-10-29 2020-03-04 2020-11-02 2020-08-31 secrétaire au sein de la Cellule Evaluation Selection de Coordination du PDVIR CM-MINHDU-91658-CS- Project Management, Individual INDV / Recrutement d'un IDA / 61320 Coordination, Monitoring and Post Consultant Open 21,751.00 20,687.75 Signed 2019-11-30 2019-11-22 2020-01-25 2020-08-31 2020-02-15 2020-09-29 2020-02-29 2020-10-07 2021-02-23 ingénieur assistant à la Cellule Evaluation Selection de Coordination du PDVIR CM-MINHDU-27468-CS- INDV / Recrutement d'un consultant individuel pour Strengthening Capacity for Individual l'optimisation des études IDA / 61320 Inclusive and Resilient Urban Post Consultant Limited 81,221.00 84,419.60 Signed 2017-09-06 2017-08-17 2017-09-11 2017-08-24 2017-09-21 2020-10-27 2017-10-08 2020-12-10 2018-01-06 techniques du projet de Management Selection construction de la station de traitement des boues de vidange de Ngombè CM-MINHDU-144175-CS- CDS / Renouvellement des Project Management, contrats de trois (03) Under IDA / 61320 Coordination, Monitoring and Post Direct Selection 16,443.00 0.00 2019-12-15 2021-01-13 2019-12-27 2020-01-17 2021-01-11 chauffeurs pour les véhicules Implementation Evaluation de la Cellule de Coordination du PDVIR CM-MINHDU-144176-CS- CDS / Renouvellement des Project Management, Under contrats de deux (02) agents IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 4,110.00 0.00 2019-12-17 2019-11-22 2019-12-27 2020-02-07 2021-02-01 Implementation d’entretien à la Cellule de Evaluation Cordination du PDVIR CM-MINHDU-144288-CS- CDS / Recrutement d'un Project Management, auditeur externe pour l'audit Under IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 51,712.00 0.00 2019-11-30 2021-01-13 2019-12-10 2020-02-13 2021-02-07 comptable et financier du Implementation Evaluation PDVIR (période PPA , exercice 2019 et 2020) CM-MINHDU-169875-CS- INDV / Recrutement de Improving Connectivity and Individual l'évaluateur externe de la mise IDA / 61320 Living environment in Post Consultant Limited 7,023.00 7,919.68 Signed 2020-06-15 2020-11-24 2020-06-20 2020-11-30 2020-07-11 2020-12-29 2020-08-15 2021-01-27 2020-09-14 en œuvre du PAR (sous- Beneficiary Cities Selection projets structurants) CM-MINHDU-179928-CS- INDV / Recrutement d'un Consultant Individuel chagé Improving Connectivity and Individual de la préparation d'une étude IDA / 61320 Living environment in Post Consultant Open 61,234.00 60,826.48 Signed 2016-06-29 2016-06-29 2016-08-24 2016-09-30 2016-09-14 2016-09-30 2016-10-19 2017-01-05 2017-04-17 sociale et d'un plan de Beneficiary Cities Selection développement communautaire de la Jeunesse CM-MINHDU-179937-CS- CDS / Réalisation des Plans d'Actions de Réinstallation des populations affectées dans le cadre des travaux Improving Connectivity and Under d'aménagement de certaines IDA / 61320 Living environment in Post Direct Selection Direct 13,718.00 0.00 2016-11-11 2021-01-13 2016-11-21 2017-01-25 2017-07-24 Implementation voiries structurantes dans les Beneficiary Cities arrondissements de Yaoundé 5 et 7, Douala 3 et 5, Ngaoundéré 2, Kumba 2 et Batouri CM-MINHDU-215982-CS- INDV / Recrutement d'un Spécialiste en Passation Project Management, Individual junior à l'Unité de Liaison Under IDA / 61320 Coordination, Monitoring and Post Consultant Open 15,225.00 0.00 2021-03-25 2021-03-05 2021-05-13 2021-06-03 2021-07-08 2022-01-04 Technique (UTL) de Yaoundé Implementation Evaluation Selection du Projet de Développement des villes Inclusives et résilientes (PDVIR) CM-MINHDU-215972-CS- INDV / Recrutement d'un Spécialiste en passation Project Management, Individual junior à l'Unité de Liaison Under IDA / 61320 Coordination, Monitoring and Post Consultant Open 15,225.00 0.00 2021-02-25 2021-03-05 2021-04-15 2021-05-06 2021-06-10 2021-12-07 Technique (UTL) de Douala du Implementation Evaluation Selection Projet de Développement des villes Inclusives et résilientes (PDVIR) CM-MINHDU-212726-CS- INDV / Sélection d'un consultant individuel pour Strengthening Capacity for Individual Under l'évaluation de la capacité de IDA / 61320 Inclusive and Resilient Urban Post Consultant Limited 20,583.00 0.00 2021-04-07 2021-03-26 2021-04-12 2021-04-15 2021-04-22 2021-05-15 2021-07-14 Implementation réponse des communes à la Management Selection crise sanitaire liée au Covid- 19 dans le cadre du PDVIR Page 12 CM-MINHDU-179158-CS- CQS / Recrutement d’un consultant individuel pour l’assistance technique Strengthening Capacity for Individual d’accompagnement des CTD à IDA / 61320 Inclusive and Resilient Urban Post Consultant Limited 15,416.00 0.00 Canceled 2020-08-10 2020-08-15 2020-09-05 2020-10-10 2021-01-08 l'identification et à la mise en Management Selection œuvre des mesures de lutte contre le covid-19 (yaoundé, ngdéré, maroua, kousseri, douala, batouri) CM-MINHDU-169893-CS- CDS / Recrutement d’un consultant (ONG) chargé des Etudes pour les travaux destinées à préserver la Improving Connectivity and capacité de drainage naturelle IDA / 61320 Living environment in Post Direct Selection Direct 10,277.00 0.00 Canceled 2020-06-30 2020-07-10 2020-09-06 2021-09-01 et contribuer à l’adaptation au Beneficiary Cities changement climatique dans les villes bénéficiaires (Batouri, Douala, Ngaoundéré et Yaoundé) CM-MINHDU-221625-CS- CDS / Recrutement d'un Project Management, Assistant en Passation des IDA / 61320 Coordination, Monitoring and Post Direct Selection Direct 21,000.00 35.59 Signed 2021-03-15 2021-02-26 2021-03-25 2021-03-02 2021-05-29 2021-03-15 2022-05-24 marchés à la Cellule de Evaluation Coordination du PDVIR CM-MINHDU-144177-CS- INDV / Recrutement d'un Project Management, Individual chauffeur à la Cellule de IDA / 61320 Coordination, Monitoring and Post Consultant Open 5,138.00 0.00 Canceled 2019-12-15 2021-01-13 2020-02-02 2020-02-23 2020-03-29 2021-03-24 Coordination du PDVIR pour le Evaluation Selection nouveau véhicule. CM-MINHDU-226965-CS- INDV / Recrutement d'un Project Management, Individual Under Responsable de la Passation IDA / 61320 Coordination, Monitoring and Post Consultant Open 39,206.00 0.00 2021-05-03 2021-04-22 2021-06-05 2021-06-19 2021-07-10 2022-07-10 Implementation des marchés à la Cellule de Evaluation Selection Coordination du PDVIR CM-MINHDU-240579-CS- INDV / Recrutement d'un Project Management, Individual Assistant au Responsable en Pending IDA / 61320 Coordination, Monitoring and Post Consultant Open 15,769.63 0.00 2021-07-30 2021-09-17 2021-10-08 2021-11-12 2022-11-07 Développement Urbain et Implementation Evaluation Selection Municipal au sein de la Cellule de Coordination du PDVIR CM-MINHDU-240588-CS- INDV / Recrutement d'un Project Management, Individual consultant individuel chargé Pending IDA / 61320 Coordination, Monitoring and Post Consultant Limited 23,980.74 0.00 2021-09-13 2021-09-18 2021-09-28 2021-10-21 2021-11-30 de l'élaboration du rapport de Implementation Evaluation Selection la revue à mi-parcours du PDVIR Page 13 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Original: 08 December 2016, Revision 1 of Updated Procurement Plan, 23 March 2017 2. Date of General Procurement Notice: 13 July 2016 3. Period covered by this procurement plan: The procurement period of project covered the first 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB Above US$ 1,500,000 2. NCB (Goods) NA 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) All 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than July 9, 2010 $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. July 9, 2010 PROCUREMENT Egypt, Arab Republic of : Equal Access and Simplified Environment for Investment (EASE) in Egypt PLAN General Information Country: Egypt, Arab Republic of Bank’s Approval Date of the Original Procurement Plan: 2016-09-22 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153487 GPN Date: 2016-07-13 Project Name: Equal Access and Simplified Environment for Investment (EASE) in Egypt Loan / Credit No: TF / A1553, TF / B1605 G Executing Agency(ies): eneral Authority for Investment WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOI-GO-REF-11 / Licenses Facilitating accessible and Under for Microsoft software to Single Stage - One TF / A1553 transparent investor services Post Request for Bids Limited 1,000,000.00 0.00 Implementati 2016-07-24 2016-08-27 2016-09-22 2016-09-22 2016-09-22 2016-10-02 2016-10-20 develop the front end of GAFI Envelope (GAFI) on automation. MOI-GO-REF-12 / Network Active Components (Back Bone switches, Edge Switches, Wireless Controller, Wireless Facilitating accessible and Single Stage - One Access Points and a Network TF / A1553 transparent investor services Post Request for Bids Open - National 1,000,000.00 474,908.42 Signed 2017-05-01 2017-04-09 2017-05-05 2017-04-11 2017-06-05 2017-06-15 2017-06-20 2017-06-24 2017-09-17 2017-12-21 Envelope Management solution) needed (GAFI) to modernize GAFI's network as part of GAFI's automation project EG-GAFI-25163-GO-RFB / State-of-the-art queuing Facilitating accessible and system including modernized Single Stage - One TF / A1553 transparent investor services Post Request for Bids Open - National 230,000.00 0.00 Canceled 2017-08-17 2017-08-22 2017-10-03 2017-11-02 2017-12-07 2018-06-05 screens and multimedia Envelope (GAFI) equipment to offer high quality service for OSS clients EG-GAFI-25169-GO-RFB / On shelf online system to Facilitating accessible and Request for Single Stage - One allow investors to request TF / A1553 transparent investor services Post Open - National 25,000.00 0.00 Canceled 2017-08-25 2017-10-20 2018-04-18 Quotations Envelope services from OSS prior to (GAFI) visiting the OSS headquarters. EG-GAFI-209422-GO-RFQ / Facilitating accessible and Procurement of Goods Request for Single Stage - One TF / B1605 transparent investor services Post Limited 35,000.00 0.00 Canceled 2020-12-18 2021-02-02 2021-02-12 2021-08-11 Hardware, IT Equipment, Quotations Envelope (GAFI) Software, license...etc. EG-GAFI-214559-GO-RFQ / Procurement of specific software licenses to enhance Facilitating accessible and system’s operations and Request for Single Stage - One TF / B1605 transparent investor services Post Limited 50,000.00 2,152,040.81 Signed 2021-01-25 2021-02-22 2021-03-22 2021-03-22 2021-09-18 security Quotations Envelope (GAFI) Software Licenses (Security applications, Project Management, etc..). EG-GAFI-218208-GO-RFB / Improving GAFI HQ and Branches communication infrastructure. Facilitating accessible and Under Single Stage - One Upgrade GAFI HQ video TF / B1605 transparent investor services Post Request for Bids Open - National 170,000.00 0.00 Implementati 2021-02-14 2021-03-01 2021-02-19 2021-04-08 2021-04-02 2021-05-02 2021-06-06 2021-10-24 Envelope conferencing infrastructure (GAFI) on Internal equipment and network and Local Servers and licenses Facilitating accessible and EG-GAFI-223699-GO-RFQ / Request for Single Stage - One TF / B1605 transparent investor services Post Limited 75,000.00 101,941.51 Signed 2021-03-14 2021-03-15 2021-04-30 2021-04-15 2021-05-02 2021-05-05 Security Software License Quotations Envelope (GAFI) EG-GAFI-228924-GO-RFQ / Facilitating accessible and Under Procurement of Goods (IT Request for Single Stage - One TF / B1605 transparent investor services Post Open - National 95,000.00 88,856.26 Implementati 2021-04-17 2021-06-12 2021-07-01 Equipment, Hardware, PCS, Quotations Envelope (GAFI) on etc....) Facilitating accessible and Under EG-GAFI-233873-GO-RFQ / Request for Single Stage - One TF / B1605 transparent investor services Post Limited 93,000.00 0.00 Implementati 2021-05-12 2021-05-23 2021-06-17 2021-10-03 Firewall Security license Quotations Envelope (GAFI) on EG-GAFI-236197-GO-RFB / Facilitating accessible and Pending Single Stage - One Enhancing GAFI TF / B1605 transparent investor services Post Request for Bids Open - National 220,000.00 0.00 Implementati 2021-06-07 2021-06-12 2021-07-24 2021-08-10 2021-09-02 2021-10-17 Envelope Communication Infrastructure (GAFI) on EG-GAFI-236200-GO-RFQ / Facilitating accessible and Under Request for Single Stage - One Licensing System Equipment - TF / B1605 transparent investor services Post Limited 100,000.00 0.00 Implementati 2021-06-12 2021-06-13 2021-07-29 2021-09-30 Quotations Envelope (Pcs, Scanners, etc..) (GAFI) on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 EG-GAFI-215419-NC-RFQ / Implementation of investment Map release 3 software development Facilitating accessible and Under Request for Single Stage - One companies to extend TF / B1605 transparent investor services Post Limited 100,000.00 115,855.73 Implementati 2021-01-26 2021-04-12 2021-03-23 2021-09-19 Quotations Envelope investment map capabilities. (GAFI) on This system is based on geographical data and more specialized platforms. EG-GAFI-214557-NC-RFQ / Licensing Request portal "submission and Appointment". GAFI Response: Facilitating accessible and The majority of the activity Request for Single Stage - One TF / B1605 transparent investor services Post Limited 100,000.00 0.00 Canceled 2021-01-23 2021-02-28 2021-03-20 2021-09-16 cost will go for the Quotations Envelope (GAFI) “implementation” that includes integration and connection with other software. EG-GAFI-214561-NC-RFQ / Companies Annual budget submission from GAFI portal. software development Facilitating accessible and Under companies to develop a Request for Single Stage - One TF / B1605 transparent investor services Post Limited 100,000.00 0.00 Implementati 2021-01-26 2021-03-07 2021-03-23 2021-09-19 system to facilitate the Quotations Envelope (GAFI) on exchange of FDI and economic performance financial data with the investors. EG-GAFI-233122-NC-RFB / Facilitating accessible and Pending Single Stage - One Licensing Single Window TF / B1605 transparent investor services Post Request for Bids Open - National 350,000.00 0.00 Implementati 2021-06-07 2021-06-12 2021-07-13 2021-08-05 2021-08-26 2021-10-20 Envelope Platform + Queening System (GAFI) on Facilitating accessible and Under EG-GAFI-236202-NC-RFQ / Request for Single Stage - One TF / B1605 transparent investor services Post Limited 100,000.00 0.00 Implementati 2021-06-12 2021-06-13 2021-08-07 2021-10-24 FDI and EP backend system Quotations Envelope (GAFI) on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-GAFI-11368-CS-QCBS / Consultancy for Upgrading the Institutional Capacities Facilitating accessible and Quality And Cost- and Process Redesign and TF / A1553 transparent investor services Post Open - International 500,000.00 460,600.00 Completed 2017-04-03 2017-04-03 2017-04-04 2017-04-05 2017-04-20 2017-05-16 2017-05-18 2017-08-15 2017-06-01 2017-07-31 2017-06-15 2017-08-31 2017-07-13 2017-09-11 2018-04-09 2018-07-01 Based Selection Improvement for the General (GAFI) Authority For Investment One Stop Shop. Facilitating accessible and Consultant EG-GAFI-201635-CS-CQS / TF / B1605 transparent investor services Post Qualification Limited 7,500.00 79,200.00 Signed 2020-11-02 2020-11-03 2020-11-16 2020-11-24 2020-12-16 2020-11-29 2021-01-20 2020-12-01 2021-07-19 Financial Auditor (GAFI) Selection EG-GAFI-215425-CS-CQS / Facilitating accessible and Consultant Improving standardized TF / B1605 transparent investor services Post Qualification Limited 40,000.00 43,750.00 Signed 2021-01-21 2021-02-18 2021-02-04 2021-03-10 2021-03-06 2021-03-28 2021-04-10 2021-03-28 2021-10-07 operation in GAFI's IT (GAFI) Selection Department INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Facilitating accessible and EG-GAFI-11390-CS-CDS / TF / A1553 transparent investor services Post Direct Selection Direct 11,400.00 37,900.00 Signed 2017-04-09 2017-04-01 2017-04-19 2017-03-30 2017-04-21 2017-04-01 2018-04-21 Project Manager (GAFI) EG-GAFI-11391-CS-CDS / Facilitating accessible and Financial Management TF / A1553 transparent investor services Post Direct Selection Direct 10,800.00 39,450.00 Signed 2017-04-09 2017-04-09 2017-04-23 2017-05-01 2017-03-18 2018-05-01 Specialist (GAFI) Facilitating accessible and Individual EG-GAFI-11394-CS-INDV / TF / A1553 transparent investor services Post Consultant Limited 60,000.00 127,500.00 Completed 2017-04-09 2017-03-19 2017-04-14 2017-03-30 2017-04-28 2017-04-02 2017-04-30 2017-04-04 2018-04-30 2018-04-04 Senior Legal Advisor (GAFI) Selection EG-GAFI-11395-CS-INDV / Facilitating accessible and Individual Senior Information Systems TF / A1553 transparent investor services Post Consultant Limited 60,000.00 162,000.00 Completed 2017-04-09 2017-04-02 2017-04-14 2017-03-30 2017-04-28 2017-05-06 2017-04-04 2018-05-06 2018-04-30 and IT Expert (GAFI) Selection Facilitating accessible and EG-GAFI-11411-CS-CDS / TF / A1553 transparent investor services Post Direct Selection Direct 10,800.00 34,950.00 Signed 2017-04-09 2017-03-16 2017-04-19 2017-03-18 2017-04-26 2018-03-18 2018-04-26 Procurement Specialist (GAFI) Facilitating accessible and EG-GAFI-11414-CS-CDS / Pending TF / A1553 transparent investor services Post Direct Selection Direct 10,800.00 0.00 2017-04-09 2017-04-19 2017-04-26 2018-04-26 Automation Expert Implementation (GAFI) Facilitating accessible and Individual EG-GAFI-11417-CS-INDV / TF / A1553 transparent investor services Post Consultant Limited 35,000.00 49,432.00 Completed 2017-04-09 2017-04-27 2017-04-19 2017-04-27 2017-05-03 2017-04-26 2017-05-31 2017-04-20 2018-05-31 2018-04-30 CRM Expert (GAFI) Selection MOI-CS-REF-21 / Facilitating accessible and Individual Recruitment of Project TF / A1553 transparent investor services Post Consultant Limited 97,200.00 0.00 Canceled 2015-10-07 2015-10-12 2015-11-25 2015-12-15 2017-04-03 Manager (GAFI) Selection EG-GAFI-13832-CS-INDV / legal consultant (15+) years experience to support the Facilitating accessible and Individual capacity of the Ministry and TF / A1553 transparent investor services Post Consultant Limited 30,000.00 0.00 Canceled 2017-04-27 2017-05-02 2017-05-23 2017-06-27 2017-12-24 GAFI to improve legal (GAFI) Selection environment and solve investors problems. Page 2 Facilitating accessible and Individual EG-GAFI-014-CS-INDV / TF / A1553 transparent investor services Post Consultant Limited 40,000.00 40,500.00 Completed 2018-01-16 2018-01-08 2018-01-24 2018-01-24 2018-02-05 2018-02-20 2018-02-25 2018-01-22 2019-06-30 2019-01-31 Investment Advisor (GAFI) Selection EG-GAFI-015-CS-INDV / Facilitating accessible and Individual Change Management TF / A1553 transparent investor services Post Consultant Limited 31,250.00 79,000.00 Completed 2018-03-14 2018-03-14 2018-04-03 2018-04-03 2018-04-11 2018-04-11 2018-04-15 2018-04-12 2018-09-30 2018-09-30 Consultant (GAFI) Selection Facilitating accessible and Individual EG-GAFI-0010-CS-INDV / TF / A1553 transparent investor services Post Consultant Limited 17,000.00 4,800.00 Signed 2017-05-31 2017-06-04 2017-06-13 2017-06-15 2017-06-18 2017-07-09 2017-06-18 2019-06-30 Procurement Officer (GAFI) Selection Facilitating accessible and Individual EG-GAFI-11421-CS-INDV / TF / A1553 transparent investor services Post Consultant Limited 17,000.00 18,000.00 Completed 2017-07-02 2017-09-13 2017-07-16 2017-07-30 2017-09-28 2017-08-11 2017-10-01 2017-12-09 2018-08-31 M & E Specialist#2 (GAFI) Selection Facilitating accessible and Individual EG-GAFI-008-CS-INDV / TF / A1553 transparent investor services Post Consultant Limited 9,250.00 12,000.00 Completed 2017-04-02 2017-04-02 2017-04-16 2017-04-16 2017-04-17 2017-04-19 2017-04-20 2017-04-20 2018-02-06 2018-01-31 Investment Advisor (GAFI) Selection Facilitating accessible and Individual EG-GAFI-009-CS-INDV / TF / A1553 transparent investor services Post Consultant Limited 120,000.00 120,000.00 Terminated 2017-05-28 2017-05-25 2017-06-06 2017-06-08 2017-06-08 2017-06-11 2017-06-12 2017-06-12 2019-06-30 2018-06-14 Senior Policy Advisor (GAFI) Selection EG-GAFI-011-CS-INDV / Facilitating accessible and Individual Monitoring & Evaluation TF / A1553 transparent investor services Post Consultant Limited 2,500.00 2,500.00 Completed 2017-07-09 2017-06-25 2017-07-10 2017-07-11 2017-07-13 2017-08-15 2017-07-15 2017-09-30 2017-09-30 Specialist#1 (GAFI) Selection EG-GAFI-016-CS-INDV / Facilitating accessible and Individual Monitoring & Evaluation TF / A1553 transparent investor services Post Consultant Limited 10,500.00 15,000.00 Signed 2018-11-04 2018-11-04 2018-11-12 2018-11-22 2018-11-22 2018-11-25 2018-11-25 2019-06-30 Specialist#3 (GAFI) Selection EG-GAFI-0013-CS-CDS / Facilitating accessible and Senior Investment Promotion TF / A1553 transparent investor services Post Direct Selection Direct 13,500.00 18,000.00 Completed 2017-10-01 2017-10-01 2017-10-03 2017-10-15 2017-10-15 2017-12-31 2017-12-31 Advisor (GAFI) Facilitating accessible and Individual EG-GAFI-199184-CS-INDV / TF / B1605 transparent investor services Post Consultant Limited 48,000.00 47,960.00 Signed 2020-10-12 2020-10-12 2020-10-17 2020-10-22 2020-11-07 2020-11-23 2020-12-12 2021-01-01 2021-06-10 Project Manager (GAFI) Selection Facilitating accessible and Individual EG-GAFI-201045-CS-INDV / TF / B1605 transparent investor services Post Consultant Limited 13,200.00 13,850.00 Signed 2020-10-22 2020-10-22 2020-10-27 2020-11-08 2020-11-17 2020-11-22 2020-12-22 2020-11-22 2021-06-20 Procurement Specialist (GAFI) Selection EG-GAFI-201050-CS-INDV / Facilitating accessible and Individual Monitoring and Evaluation TF / B1605 transparent investor services Post Consultant Limited 42,000.00 45,780.00 Terminated 2020-10-22 2020-10-22 2020-10-27 2020-11-08 2020-11-17 2020-11-22 2020-12-22 2020-11-24 2021-06-20 Specialist (GAFI) Selection Facilitating accessible and Individual EG-GAFI-201051-CS-INDV / TF / B1605 transparent investor services Post Consultant Limited 18,000.00 13,500.00 Signed 2020-10-22 2020-10-22 2020-10-27 2020-11-08 2020-11-17 2020-11-08 2020-12-22 2021-02-01 2021-06-20 Financial Analyst (GAFI) Selection Facilitating accessible and Individual EG-GAFI-215498-CS-INDV / TF / B1605 transparent investor services Post Consultant Limited 48,000.00 0.00 Canceled 2021-01-21 2020-11-22 2021-01-26 2021-02-16 2021-03-23 2021-09-19 Project Manager (GAFI) Selection Facilitating accessible and Individual EG-GAFI-216264-CS-INDV / TF / B1605 transparent investor services Post Consultant Limited 5,400.00 5,400.00 Signed 2021-01-27 2021-02-01 2021-02-01 2021-02-14 2021-02-22 2021-02-15 2021-03-29 2021-02-15 2021-09-25 Business Analyst Consultant (GAFI) Selection Facilitating accessible and Individual EG-GAFI-216266-CS-INDV / TF / B1605 transparent investor services Post Consultant Limited 16,200.00 16,200.00 Signed 2021-01-27 2021-02-01 2021-02-01 2021-02-10 2021-02-22 2021-02-15 2021-03-29 2021-02-15 2021-09-25 Investment Analyst Consultant (GAFI) Selection Facilitating accessible and Individual EG-GAFI-217370-CS-INDV / TF / B1605 transparent investor services Post Consultant Limited 3,250.00 3,240.00 Signed 2021-02-04 2021-02-07 2021-02-09 2021-02-14 2021-03-02 2021-02-15 2021-04-06 2021-02-15 2021-10-28 Junior Business Analyst (GAFI) Selection EG-GAFI-225197-CS-CDS / Facilitating accessible and Enhancing Human and Under TF / B1605 transparent investor services Post Direct Selection Direct 30,000.00 0.00 2021-03-17 2021-03-17 2021-03-27 2021-05-31 2021-09-30 Organizational Capacities for Implementation (GAFI) GAFI EG-GAFI-229272-CS-INDV / Facilitating accessible and Individual Under FDI Analysis and sampling TF / B1605 transparent investor services Post Consultant Limited 25,000.00 0.00 2021-04-14 2021-04-18 2021-04-19 2021-05-10 2021-06-14 2021-12-11 Implementation expert (GAFI) Selection Page 3 PROCUREMENT PLAN Poverty Reduction Fund Project, Phase III (Project ID: P157963) Revised as of 11 May 2017 I. GENERAL 1. Project information - Country: Lao PDR - Borrower/Recipient: Lao PDR - Project Name: Poverty Reduction Fund Project, Phase III - Project ID No: P157963 - Project Implementing Agency: Poverty Reduction Fund, 2. Bank’s approval Date of the procurement Plan: - Original Plan: 28 April 2016 - First revised: 11 May 2017 3. Date of General Procurement Notice: - UNDB online: 19 April 2017 4. Period covered by this procurement plan:18 months II. GOODS AND WORKS AND NON-CONSULTING SERVICES 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Contract Value No. Procurement Method Threshold Comments Threshold USD USD 1 ICB (Goods) >=600,000 All contracts above 1.5 million 2 NCB (Goods) 100,000 - None <600,000 3 Shopping (Goods) <100,000 None 4 Direct Contracting (Goods, - All contracts Subject to Works, and Non-consulting above 1.5 the Bank Services) million and 5 approval. million for goods and works respectively 5 ICB (Works) >= 2,000,000 All contracts above 5 million 6 NCB (Works) 200,000 - None <2,000,000 7 Shopping (Works) <200,000 None 8 Procurement from UN <600,000 None Use World agencies (Goods) Bank-UN contract template 1 2. Prequalification: Not expected for the works/goods packages 3. Reference to Project Operational Manual: PRF III 4. Any Other Special Procurement Arrangements: N/A 5. Procurement Packages for Works & Goods (prior & post reviews) with Methods and Time Schedule: The following table lists goods, furniture, works contracts for which procurement activities are expected to commence during the project cycle. A. Goods Domesti Review PQ Expect Estimat Proc. c by Contract (ye ed Bid/ No. ed Cost Metho Prefere Bank Comment (Description) s/n Openin USD d nce (Prior / o) g Date (yes/no) Post) G00 Procurement of 3 99,000 Shoppi No No Post Dec- Completed 1 Pick-ups 4x4 WD ng 2016 Keo Auto Co. Double Cab (1,078,000 ,000 LAK) G00 Procurement of 40 52,000 Shoppi No No Post Dec- 3 Motorcycles 100- ng 2017 125 cc G00 Procurement of IT 144,900 Shoppi No No Post Dec- 4 equipment ng 2017 G00 Procurement of 2,500 Shoppi No No Post Dec- 5 Furniture for PRF ng 2017 Central Office G00 Procurement of 15,600 Shoppi No No Post Oct- Multiple 6 Furniture for ng 2017 packages or framework Provinces and contract districts (600 USD per Office) G00 Procurement of 3 99,000 Shoppi No No Post Dec- 7 Pick-ups 4x4 WD ng 2018 Double Cab G00 Procurement of 58 75,400 Shoppi No No Post Dec- 8 Motorcycles 100- ng 2018 125 cc G00 Procurement of IT 90,000 Shoppi No No Post Dec- 9 equipment ng 2018 G01 Procurement of 15,600 Shoppi No No Post Dec- Multiple 0 Furniture for ng 2018 packages or framework provinces and contract districts (600 USD per Office) Total (Goods): 594,00 0 B. WORKS Contract Estimat Proc. PQ Domesti Revie Expect No. Comment (Description) ed Cost Metho (ye c w by ed Bid/ 2 USD d s/n Prefere Bank Openin o) nce (Prior / g Date (yes/no) Post) W001 PRF Central Off. 19,600 Shoppi No No Post Dec- repair ng 2018 W002 PRF Province Off. 7,500 Shoppi No No Post Dec- Multiple repair (1,500 USD ng 2017 packages each office) W003 PRF District Off. 25,200 Shoppi No No Post Dec- Multiple repair (1,200 USD ng 2017 packages each office) W004 PRF Province Off. 7,500 Shoppi No No Post Dec- Multiple repair (1,500 USD ng 2018 packages each office) W005 PRF District Off. 25,200 Shoppi No No Post Dec- Multiple Repair (1,200 USD ng 2018 packages each office) Total (Works): 85,000 C. IEC Materials Revie Expect Domesti PQ w by ed Bid/ Estimat Proc. c Contract (ye Bank Quotati Commen No. ed Cost Metho Prefere (Description) s/n (Prio on t USD d nce o) r/ Openin (yes/no) Post) g Date IEC01 Produce PRF Calendar, 45,000 Shoppi No No Post Dec- Diary, logo, sticker, ng 2017 brochure, T-shirt etc…. IEC02 Printing manual, 50,000 Shoppi No No Post Sep- guideline, report, etc… ng 2017 IEC03 Produce PRF story 45,000 Shoppi No No Post Sep- video and etc… ng 2017 IEC04 Printing Livelihoods 17,500 Shoppi No No Post Jan- and Nutrition IEC ng 2018 materials Total (IEC): 157,50 0 Total (Goods + Works + IEC) = 836,500 III. SELECTION OF CONSULTANTS 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Contract Value Prior Review No. Selection Method Comments Threshold Threshold (USD) (USD) 1 Competitive Methods (Firms) >=300,000 All contracts above – Quality & Cost Based 500,000 3 Contract Value Prior Review No. Selection Method Comments Threshold Threshold (USD) (USD) Selection (QCBS) and Quality Based Selection (QBS) 2 Competitive Methods (Firms) <300,000 None – Least-Cost Selection (LCS) and Selection Based on Consultant Qualifications (CQS) 3 Single Source All contracts above Subject to the 500,000 and 200,000 Bank approval. for firm and individual consultant respectively 4 Individual Consultants All contract above Project staff may 200,000 for entire be employed over project duration. All entire duration of ToRs require World project or as Bank clearance requirement subject to annual performance review. Contract extension shall be subject to post review. 2. Short list comprising entirely of national consultants: No short lists of consultants for services are expected to comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. However, if a need arises during the project implementation and if it is warranted, short lists of consultants for services estimated to cost less than $200,000 equivalent per contract may be composed entirely of national consultants 3. Any Other Special Selection Arrangements: Advance contracting may be applied for some items as specified in the Procurement Plan. All existing project staff will be single source subject to satisfactory performance review by the Project and Bank. 4. Consultancy Assignments with Selection Methods (prior & post reviews) and Time Schedule 5. For all individual contract amendments /extensions/ follow-on contracts, etc., the following guidelines shall apply: i) gross salary increases shall be limited to CPI plus a performance-based increase not to exceed 2% of the current contract per annum; ii) there shall be no increase in living allowances or similar expenses unless explicitly authorized by MOF Decree. Selecti Estimat Bank Expect Description of Consultant on Sr. e Cost Revie ed EOI Comments Services Metho (USD) w Date d C00 PRF: 197 Local Staff (Central 3,133,1 SSS Post Dec- Completed 1 Provincial and District staff ) 71 2016 Continuation contracts C00 LN: 52 Local Staff 375,500 SSS Post Jan- Completed 2 2017 Continuation contracts 4 Selecti Estimat Bank Expect Description of Consultant on Sr. e Cost Revie ed EOI Comments Services Metho (USD) w Date d C00 International Institutional 19,840 SSS Post Jun- Continuation. 3 Development Consultant 2017 Dr. Gamini Premaratna Batuwitage C00 International TA 17,000 SSS Post Jun- Continuation. 4 2017 Garvan O’Keeffe C00 International M&E 12,000 SSS Post Jun- Continuation. 5 2017 George Norman Collet C00 International Internal Audit 5,661 SSS Post Jul-2017 Continuation. 6 Advisor Competitive selection under PRF II. Bishwakanta Gautam C00 Senior Technical Advisor 93,636 SSS Post Jan- Completed 7 2017 Julien Rossard C00 Technical, Cost Effectiveness, 70,000 CQS Post Feb- 8 Cost Benefits Assessment 2018 C00 ACCPAC Accounting System 10,000 CQS Post Feb- 9 Software Upgrading 2018 C01 Providing capacity building 5,000 IC Post Jun- 0 and assistance on website 2017 improvement, update and maintenance C01 External Audit FY 2016-2017 25,000 CQS Post Jun- 1 2017 C01 PRF Process Evaluation 50,000 CQS Post Nov- 2 Assessment 2018 C01 Organization Assessment 50,000 CQS Post Dec- 3 2017 C01 HH Survey (Impact 50,000 CQS Post Mar- 4 Evaluation) 2019 C01 International Road 25,000 SSS Post May- Continuation. 5 Maintenance and 2017 Competitive Management selection under PRF II (SDC Fund). Mr. Serge Cartier van Dissel C01 International Disaster Risk 25,000 IC Post Jun- Under SDC Fund 6 Management (DRM) 2017 Grand Total : 3,966,8 08 5 PROCUREMENT Lao People's Democratic Republic : Poverty Reduction Fund III PLAN General Information Country: Lao People's Democratic Republic Bank’s Approval Date of the Original Procurement Plan: 2017-08-24 2021-05-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157963 GPN Date: 2017-04-18 Project Name: Poverty Reduction Fund III Loan / Credit No: IDA / 58270, IDA / 65060 Poverty Reduction Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G003 / 40 Motorcycles 100- Component 3 ? Project Request for Single Stage - One IDA / 58270 Post Limited 52,000.00 0.00 Canceled 2017-12-31 2017-12-31 2017-12-31 125 cc Management Quotations Envelope G001 / 3 Pick-up Trucks 4x4 Component 3 ? Project Request for Single Stage - One IDA / 58270 Post Limited 99,000.00 126,446.15 Completed 2016-10-14 2016-11-15 2016-11-15 2017-03-10 2017-03-10 WD Double Cab Management Quotations Envelope Component 4 ? Nutrition IEC04 / Printing Livelihoods Request for Single Stage - One IDA / 58270 Enhancing Livelihood Post Limited 17,500.00 0.00 Canceled 2018-02-05 2018-04-02 2018-09-29 and Nutrition IEC Material Quotations Envelope Development Component 2 ? Local and IEC03 / Produce PRF Story Request for Single Stage - One IDA / 58270 Community Development Post Limited 36,000.00 12,317.55 Completed 2018-04-30 2018-04-30 2018-04-24 2018-04-30 2018-11-21 Video and etc… Quotations Envelope Capacity Building Component 2 ? Local and IEC02 / Printing Manuals, Request for Single Stage - One IDA / 58270 Community Development Post Limited 50,000.00 89,222.04 Signed 2017-09-30 2017-09-30 2018-06-29 2017-09-30 2018-08-21 Guidelines, Reports, etc... Quotations Envelope Capacity Building IEC01 / Produce PRF Component 2 ? Local and Request for Single Stage - One Calendar, Diary, Logo, Sticker, IDA / 58270 Community Development Post Limited 45,000.00 38,640.74 Completed 2018-01-31 2018-01-31 2018-02-21 2018-01-31 2018-06-19 Quotations Envelope Brochure, T-shirt etc…. Capacity Building G011 / TA survey tools including 12 Schmidt Component 3 ? Project Request for Single Stage - One hammers, 5 Dynamic Cone IDA / 58270 Post Limited 55,000.00 35,340.20 Completed 2018-03-05 2018-03-15 2018-04-30 2018-04-25 2018-10-27 2018-05-16 Management Quotations Envelope Spectrometers, 45 Abney levels G007 / 3 Pick-up Trucks 4x4 Component 3 ? Project Request for Single Stage - One IDA / 58270 Post Limited 99,000.00 128,689.57 Completed 2018-12-31 2018-12-31 2019-06-12 2018-12-31 2019-08-13 WD Double Cab Management Quotations Envelope IEC06 / Printing field construction record book and Component 2 ? Local and Request for Single Stage - One quality control book (compare IDA / 58270 Community Development Post Limited 17,900.00 16,616.37 Completed 2018-04-07 2018-03-30 2018-06-02 2018-04-26 2018-11-29 2018-06-08 Quotations Envelope equipment for construction Capacity Building good and bad pictograph) G004 / Procurement of equipment support to IEC Component 3 ? Project Request for Single Stage - One IDA / 58270 Post Limited 13,000.00 12,714.15 Completed 2018-10-05 2018-09-19 2018-11-30 2018-10-19 2019-05-29 2018-11-20 (Camera Lens, Battery and Management Quotations Envelope ect....) G008 / 58 Motorcycles 100- Component 3 ? Project Request for Single Stage - One IDA / 58270 Post Limited 75,400.00 0.00 Canceled 2018-12-31 2018-12-31 2018-12-31 125 cc Management Quotations Envelope G009 / IT Equipment Component 3 ? Project Request for Single Stage - One IDA / 58270 Post Limited 90,000.00 0.00 Canceled 2018-12-31 2018-12-31 2018-12-31 (Computer, Printer, etc...) Management Quotations Envelope Component 2 ? Local and Pending AF-G-001 / Sub-project IEC Request for Single Stage - One IDA / 58270 Community Development Post Limited 36,000.00 0.00 Implementati 2020-04-05 2020-05-31 2020-11-27 Materials Quotations Envelope Capacity Building on Component 2 ? Local and AF-G-002 / Environmental Request for Single Stage - One IDA / 58270 Community Development Post Limited 2,400.00 1,975.43 Completed 2020-02-05 2020-03-10 2020-04-01 2020-04-02 2020-09-28 2020-05-04 and Social Safeguards Quotations Envelope Capacity Building AF-G-003 / Office IT Component 3 ? Project Request for Single Stage - One IDA / 58270 Post Open - National 66,000.00 43,655.55 Completed 2020-03-04 2020-04-29 2020-07-09 2020-10-26 2020-09-08 Equipment Management Quotations Envelope Pending Component 3 ? Project Single Stage - One AF-G-004 / Motorbikes IDA / 58270 Post Request for Bids Open - National 252,000.00 0.00 Implementati 2020-01-31 2020-02-05 2020-03-18 2020-04-17 2020-05-22 2020-11-18 Management Envelope on Component 4 ? Nutrition Request for Single Stage - One AF-G-005 / Record Books IDA / 58270 Enhancing Livelihood Post Limited 43,525.00 41,495.23 Completed 2020-02-05 2020-05-18 2020-04-01 2020-06-12 2020-09-28 2020-08-17 Quotations Envelope Development Component 4 ? Nutrition Pending AF-G-006 / Floor Mats, Request for Single Stage - One IDA / 58270 Enhancing Livelihood Post Limited 52,255.00 0.00 Implementati 2020-04-05 2020-05-31 2020-11-27 Boxes Quotations Envelope Development on Component 4 ? Nutrition AF-G-007 / Produce Posters, Request for Single Stage - One IDA / 58270 Enhancing Livelihood Post Open - National 23,088.00 15,131.05 Completed 2020-04-05 2020-05-31 2020-07-12 2020-11-27 2020-08-17 Leaflets, etc... Quotations Envelope Development AF-G-008 / Mills, Plastic Component 4 ? Nutrition Request for Single Stage - One Boxes, Extension Cords and IDA / 58270 Enhancing Livelihood Post Limited 23,850.00 23,208.77 Completed 2020-04-05 2020-07-30 2020-05-31 2020-08-25 2020-11-27 2020-09-10 Quotations Envelope Adapter Development Page 1 Component 4 ? Nutrition Request for Single Stage - One AF-G-009 / Cooking Sets IDA / 58270 Enhancing Livelihood Post Limited 52,470.00 47,630.15 Completed 2020-05-05 2020-08-06 2020-06-30 2020-08-27 2020-12-27 2020-10-02 Quotations Envelope Development Component 4 ? Nutrition Pending AF-G-010 / Stoves IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 5,000.00 0.00 Implementati 2020-03-31 2020-04-05 2020-05-10 2020-11-06 Development on Component 4 ? Nutrition Pending AF-G-011 / Pellet Machines IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 20,000.00 0.00 Implementati 2020-03-31 2020-04-05 2020-05-10 2020-11-06 and Driers Development on Component 4 ? Nutrition Pending AF-G-012 / Pellets IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 5,824.00 0.00 Implementati 2020-03-31 2020-04-05 2020-05-10 2020-11-06 Development on Component 4 ? Nutrition Pending AF-G-013 / Stove Top up IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 500.00 0.00 Implementati 2020-03-31 2020-04-05 2020-05-10 2020-11-06 Development on Component 4 ? Nutrition Pending Request for Single Stage - One AF-G-014 / Cooking Book IDA / 58270 Enhancing Livelihood Post Limited 24,310.00 0.00 Implementati 2020-05-05 2020-06-30 2020-12-27 Quotations Envelope Development on AF-G-015 / Agricultural Component 4 ? Nutrition Request for Single Stage - One Seasonal Calendar and Crop IDA / 58270 Enhancing Livelihood Post Limited 4,770.00 5,108.86 Completed 2020-09-05 2020-07-30 2020-10-31 2020-08-26 2021-04-29 2020-09-22 Quotations Envelope Sheets Development AF-G-016 / Microphones, Component 4 ? Nutrition Request for Single Stage - One Phone Projectors, Speakers, IDA / 58270 Enhancing Livelihood Post Limited 95,400.00 148,247.04 Completed 2020-02-05 2020-07-22 2020-04-01 2020-08-27 2020-09-28 2020-11-26 Quotations Envelope and Phone Credit Development Component 4 ? Nutrition Pending AF-G-017 / Shade house Single Stage - One IDA / 58270 Enhancing Livelihood Post Request for Bids Open - National 108,750.00 0.00 Implementati 2020-03-31 2020-04-05 2020-05-17 2020-06-16 2020-07-21 2021-01-17 Materials Envelope Development on Component 4 ? Nutrition Request for Single Stage - One AF-G-018 / Seeds IDA / 58270 Enhancing Livelihood Post Limited 87,000.00 0.00 Canceled 2020-03-04 2020-04-29 2020-10-26 Quotations Envelope Development NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4 ? Nutrition Pending FA-NC.001 / Buffalo Dairy IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 55,000.00 0.00 Implementati 2020-06-01 2020-06-06 2020-07-11 2021-01-07 Development on Component 4 ? Nutrition Under AF-NC-003 / Home Nutrition IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 186,000.00 0.00 Implementati 2021-03-31 2021-03-09 2021-04-05 2021-05-04 2021-05-10 2021-11-06 Garden Development on Component 4 ? Nutrition AF-NC.002 / Home Nutrition IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 186,000.00 0.00 Canceled 2020-06-01 2021-03-09 2020-06-06 2020-07-11 2021-01-07 Garden Development Component 4 ? Nutrition AF-C.033 / Multi-media Peer IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 160,000.00 0.00 Canceled 2020-06-01 2021-03-09 2020-06-06 2020-07-11 2021-01-07 Learning Development Component 4 ? Nutrition Under AF-NC-002 / Multi-media IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 160,000.00 0.00 Implementati 2021-03-31 2021-03-09 2021-04-05 2021-05-04 2021-05-10 2021-11-06 Peer Learning Development on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Consultant C011 / External Audit of PRF Component 3 ? Project IDA / 58270 Post Qualification Open - National 38,000.00 37,953.00 Signed 2017-06-30 2018-04-10 2017-06-30 2017-06-30 2017-04-28 2017-06-30 2017-07-27 2017-06-30 2017-09-13 2017-06-30 III for fiscal year 2016-2020 Management Selection Component 2 ? Local and Consultant C009 / ACCPAC Accounting IDA / 58270 Community Development Post Qualification Open - National 10,000.00 0.00 Canceled 2018-02-28 2018-02-28 2018-02-28 2018-02-28 2018-02-28 2018-02-28 System Software Upgrading Capacity Building Selection Component 2 ? Local and Consultant C013 / Organization IDA / 58270 Community Development Post Qualification Open - National 50,000.00 0.00 Canceled 2017-12-31 2017-12-31 2017-12-31 2017-12-31 2017-12-31 2017-12-31 Assessment Capacity Building Selection Component 2 ? Local and Consultant C012 / PRF Process IDA / 58270 Community Development Post Qualification Open - National 50,000.00 0.00 Canceled 2018-11-30 2018-11-30 2018-11-30 2018-11-30 2018-11-30 2018-11-30 Evaluation Assessment Capacity Building Selection C008 / Technical, Cost Component 2 ? Local and Consultant Effectiveness, Cost Benefits IDA / 58270 Community Development Post Qualification Open - National 70,000.00 91,041.00 Completed 2019-04-30 2017-12-04 2019-04-30 2019-04-30 2018-02-06 2019-04-30 2018-02-28 2019-04-30 2018-03-12 2019-04-30 2018-05-18 Assessment Capacity Building Selection Component 4 ? Nutrition Consultant C016 / Micro-finance IDA / 58270 Enhancing Livelihood Post Qualification Open - National 20,000.00 21,850.00 Completed 2018-10-31 2018-11-01 2018-11-21 2018-11-21 2019-01-04 2019-01-10 2019-02-03 2019-02-20 2019-03-10 2019-03-13 2019-09-06 2020-01-28 Services Development Selection Component 2 ? Local and Consultant C014 / HH Survey (Impact IDA / 58270 Community Development Post Qualification Open - National 50,000.00 0.00 Canceled 2019-11-15 2019-11-30 2019-11-30 2019-11-30 2019-11-30 2019-11-30 Evaluation) Capacity Building Selection INDIVIDUAL CONSULTANTS Page 2 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C003 / International Component 2 ? Local and Institutional Development IDA / 58270 Community Development Post Direct Selection Direct 19,840.00 0.00 Canceled 2017-06-30 2017-06-30 2017-07-21 2018-01-17 Consultant Capacity Building Component 2 ? Local and C004 / International TA IDA / 58270 Community Development Post Direct Selection Direct 17,000.00 0.00 Canceled 2017-06-30 2017-06-30 2017-07-21 2018-01-17 Specialist Capacity Building Component 2 ? Local and C005 / International M&E IDA / 58270 Community Development Post Direct Selection Direct 12,000.00 18,395.00 Terminated 2018-03-31 2018-01-08 2018-03-31 2018-01-08 2018-04-21 2018-03-19 2018-10-18 Consultant Capacity Building C015 / International Component 2 ? Local and Community Force Account IDA / 58270 Community Development Post Direct Selection Direct 30,000.00 61,887.00 Signed 2018-03-30 2017-12-04 2018-04-09 2018-01-08 2018-06-13 2018-03-19 2018-12-10 (CFA) Specialist Capacity Building C010 / PRF III website Component 2 ? Local and Individual improvement, update and IDA / 58270 Community Development Post Consultant Limited 5,000.00 7,342.00 Completed 2018-03-31 2017-12-04 2018-03-31 2018-03-31 2018-03-06 2018-03-31 2018-03-14 2018-03-31 2018-09-19 maintenance Capacity Building Selection Component 2 ? Local and C007 / Senior Technical IDA / 58270 Community Development Post Direct Selection Direct 93,636.00 96,468.00 Completed 2017-01-31 2017-01-31 2017-02-21 2018-01-05 2017-08-20 2018-09-15 Advisor Capacity Building Component 2 ? Local and C006 / International Internal IDA / 58270 Community Development Post Direct Selection Direct 5,661.00 6,235.00 Completed 2017-07-31 2017-06-13 2017-07-31 2017-08-21 2017-07-18 2018-02-17 2018-02-01 Audit Advisor Capacity Building Individual C017 / National Senior Component 3 ? Project IDA / 58270 Post Consultant Limited 21,000.00 20,766.27 Completed 2018-10-31 2018-08-14 2018-11-05 2018-09-06 2018-11-26 2018-10-15 2018-12-31 2018-10-16 2019-06-29 2019-12-31 Capacity Building Officer Management Selection Individual C018 / National Technical Component 3 ? Project IDA / 58270 Post Consultant Limited 23,000.00 22,745.01 Completed 2018-10-31 2018-08-14 2018-11-05 2018-09-06 2018-11-26 2018-10-15 2018-12-31 2018-10-16 2019-06-29 2019-12-31 Internal Audit Officer Management Selection C019 / Training on Home Nutrition Garden and Component 4 ? Nutrition Community Video IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 12,167.00 11,683.32 Completed 2019-08-21 2019-07-21 2019-08-31 2019-08-23 2019-11-04 2019-09-30 2020-05-02 2020-05-29 Development of 2 Buffalo Development Dairy Product and 1 Home Nutrition Garden Construction Component 4 ? Nutrition C020 / Training on technical IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 13,500.00 12,176.39 Signed 2019-08-21 2019-07-21 2019-08-31 2019-08-23 2019-11-04 2019-11-18 2020-05-02 skill for raising dairy buffaloes Development AF-C.031 / External Financial Component 3 ? Project Under IDA / 58270 Post Direct Selection Direct 42,500.00 0.00 2020-09-01 2021-04-12 2020-09-11 2021-05-21 2020-11-15 2021-05-14 Audit Management Implementation AF-C.001 / Executive Component 3 ? Project IDA / 58270 Post Direct Selection Direct 58,834.00 73,545.00 Completed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 2021-03-31 Director Management Individual AF-C.002 / Deputy Executive Component 3 ? Project IDA / 58270 Post Consultant Open 41,565.00 48,496.00 Completed 2020-01-31 2019-12-18 2020-03-20 2020-01-23 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 2021-03-31 Director Management Selection AF-C.003 / TA Specialist Component 3 ? Project IDA / 58270 Post Direct Selection Direct 41,526.00 85,134.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 (Head) Management Individual Component 3 ? Project AF-C.004 / TA Assistant IDA / 58270 Post Consultant Open 23,057.00 42,940.00 Signed 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-03-01 2020-11-11 Management Selection AF-C.005 / Monitoring Component 3 ? Project IDA / 58270 Post Direct Selection Direct 35,700.00 73,188.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 &Evaluation Specialist (Head) Management Individual Component 3 ? Project AF-C.006 / MIS Officer IDA / 58270 Post Consultant Open 15,610.00 17,006.00 Signed 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 Management Selection Individual AF-C.007 / Reporting and Component 3 ? Project IDA / 58270 Post Consultant Open 15,609.00 12,000.00 Terminated 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-03-01 2020-11-11 Evaluation Officer Management Selection AF-C.008 / Finance and Component 3 ? Project Administration Specialist IDA / 58270 Post Direct Selection Direct 41,526.00 85,134.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 Management (Head) AF-C.009 / FM Supervision Component 3 ? Project IDA / 58270 Post Direct Selection Direct 28,223.00 57,863.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 Officer Management AF-C.010 / Accountant Component 3 ? Project IDA / 58270 Post Direct Selection Direct 28,224.00 57,864.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 Officer Management AF-C.011 / Accounting Component 3 ? Project IDA / 58270 Post Direct Selection Direct 19,092.00 39,144.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 Package Officer Management Component 3 ? Project AF-C.012 / Cashier IDA / 58270 Post Direct Selection Direct 10,391.00 21,299.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 Management AF-C.013 / Procurement Component 3 ? Project IDA / 58270 Post Direct Selection Direct 30,812.00 63,164.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 Officer Management Individual AF-C.014 / Procurement Component 3 ? Project IDA / 58270 Post Consultant Open 13,031.00 22,780.00 Signed 2020-01-31 2019-12-18 2020-03-20 2020-04-30 2020-04-10 2020-04-30 2020-05-15 2020-05-01 2020-11-11 Assistant Management Selection Component 3 ? Project AF-C.015 / IT Officer IDA / 58270 Post Direct Selection Direct 19,092.00 39,144.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 Management Page 3 Individual AF-C.016 / Administration Component 3 ? Project IDA / 58270 Post Consultant Open 8,967.00 13,130.00 Signed 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 Assistant Management Selection AF-C.017 / Nutrition & Individual Component 3 ? Project Community Development IDA / 58270 Post Consultant Open 35,700.00 37,800.00 Signed 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 Management Specialist (Head) Selection Individual AF-C.018 / Capacity Component 3 ? Project IDA / 58270 Post Consultant Open 21,951.00 21,000.00 Terminated 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 Development Officer Management Selection Component 4 ? Nutrition AF-C.019 / Agriculture & IDA / 58270 Enhancing Livelihood Post Direct Selection Direct 33,305.00 68,273.00 Signed 2020-01-31 2019-12-18 2020-02-10 2019-12-24 2020-04-15 2019-12-30 2020-10-12 Livelihood Specialist (Head) Development Component 4 ? Nutrition Individual AF-C.020 / Micro-Finance IDA / 58270 Enhancing Livelihood Post Consultant Open 23,058.00 15,400.00 Terminated 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 Officer Development Selection Component 4 ? Nutrition Individual AF-C.021 / Micro-Finance IDA / 58270 Enhancing Livelihood Post Consultant Open 15,372.00 10,000.00 Terminated 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 Assistant Development Selection Component 4 ? Nutrition Individual AF-C.022 / Agricultural & IDA / 58270 Enhancing Livelihood Post Consultant Open 25,620.00 40,940.00 Signed 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 Livestock Officer Development Selection Component 4 ? Nutrition Individual AF-C.023 / Senior Nutrition IDA / 58270 Enhancing Livelihood Post Consultant Open 29,392.00 15,730.00 Terminated 2020-01-31 2019-12-18 2020-03-20 2020-01-24 2020-04-10 2020-01-27 2020-05-15 2020-02-01 2020-11-11 Officer Development Selection Component 4 ? Nutrition Individual AF-C.021-1 / Micro-finance IDA / 58270 Enhancing Livelihood Post Consultant Open 12,372.00 21,761.00 Signed 2020-07-11 2019-12-18 2020-07-22 2020-05-29 2020-08-12 2020-06-02 2020-09-16 2020-07-21 2021-03-15 Assistant Development Selection Individual AF-C.007-1 / Reporting and Component 3 ? Project IDA / 58270 Post Consultant Open 10,809.00 24,180.00 Signed 2020-07-11 2019-12-18 2020-08-29 2020-06-22 2020-09-19 2020-06-24 2020-10-24 2020-07-01 2021-04-22 Evaluation Officer Management Selection Component 4 ? Nutrition Individual AF-C.023-1 / Senior IDA / 58270 Enhancing Livelihood Post Consultant Open 22,238.00 36,000.00 Signed 2020-07-11 2019-12-18 2020-08-29 2020-06-21 2020-09-19 2020-06-25 2020-10-24 2020-07-01 2021-04-22 Nutrition Officer Development Selection Component 4 ? Nutrition Individual AF-C.020-1 / Microfinance IDA / 58270 Enhancing Livelihood Post Consultant Open 21,600.00 21,456.00 Signed 2021-03-04 2021-03-29 2021-04-22 2021-05-13 2021-05-13 2021-05-14 2021-06-17 2021-05-17 2021-12-14 Officer Development Selection Individual AF-C.018-1 / Capacity Component 3 ? Project Under IDA / 65060 Post Consultant Open 20,000.00 0.00 2021-05-10 2021-05-18 2021-06-28 2021-07-19 2021-08-23 2022-02-19 Building Officer Management Implementation Selection AF-C.001-1 / Executive Component 3 ? Project Under IDA / 65060 Post Direct Selection Direct 56,000.00 0.00 2021-05-10 2021-05-18 2021-05-20 2021-07-24 2022-01-20 Director Management Implementation Page 4 Procurement Plan I. General 1. Project Information Country : Kenya Recipient : Republic of Kenya Project Name : National Agriculture and Rural Inclusive Growth Loan Credit No. : IDA 59000 2. Date of General Procurement Notice : 9th February 2018 3. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services 1. Thresholds for the Method of Procurement: Method of Procurement Thresholds for Method (US$ equivalent) Open International (Goods) Equal to or more than 3 million Open National ( Goods) – Open < $3 million Tender as per PPDA 2015 RFQ (Goods) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Open International (Works) Equal to or more than 15 million Open National (Works) - Open Less than 15 million Tender as per PPDA 2015 RFQ (works) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Method of Procurement Thresholds for Method (US$ equivalent) Open International (Non-consulting Equal to or More than 3 million Services) Open National (Non-consulting Less than 3 million Services) - Open Tender as per PPDA 2015 Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations Prior Review: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection (Project Procurement Risk Rating is “High”): (a) Goods, information technology and Non-consulting Services: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1.5 million (b) Works (including turnkey, supply & installation of plant and equipment and PPP); First procurement under the project irrespective of value and all procurements estimated to cost more than USD 5 million and The prior review thresholds will be reviewed during the implementation of the project and modified, based on the risk assessment. 2. For contracts subject to prior review, the Borrower shall seek the Bank’s no objection before agreeing to: a. an extension of the stipulated time for execution of a contract that has an impact on the planned completion of the project; b. any material modification of the scope of the Works, Goods, Non- consulting services or Consulting Services, or other significant changes to the terms and conditions of the contract; c. any variation order or contract amendment (except in cases of extreme urgency), including due to extension of time, that singly or combined with all previous variation orders or amendments, increases the original contract amount by more than 15% (fifteen percent); or d. the proposed termination of the contract. The Borrower / IA shall provide a copy of all amendments to the contract to the Bank for its records. 3. Prequalification Not Applicable Domestic Preference. The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations. Domestic preference shall not apply in the procurement of works. 4. Reference to Standard Procurement Documents Bank’s Standard RFB Goods and RFP Consulting Services dated July 2016 will be used as a base and incorporating suitable modifications and the same would be agreed with the Bank subject international competition. 5. Any Other Special Procurement Arrangements A. Procurement approach under CDD Approach by Communities: Applicable if stipulated in the PAD. B. When approaching the national market, as agreed in the Procurement Plan, the Open Tender procedure of Public Procurement and Asset Disposal Act 2015 and Regulations 2017 may be used. The specific Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. Other national procurement arrangements (other than national open competitive procurement), that may be applied by the Borrower (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. In all cases, the national procurement procedures to be used shall give due attention to quality aspects. 6. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Selection methods of procurement of Consultants' Services (Firms): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Quality and Cost Based As per requirements of para 7.3 of the Selection (QCBS) Regulations Quality Based Selection As per requirements of para 7.8 to 7.10 (QBS) of the Regulations Selection based on a Fixed As per requirements of para 7.4 and 7.5 of the Budget (FBS) Regulations Selection Based on Least As per requirements of para 7.6 and 7.7 of the Cost Basis (LCS) Regulations Selection based on As per requirements of para 7.11 and 7.12 of Consultant’s Qualification the Regulations (CQ) Direct Must meet the requirements of Para 7.13 to 7.15 of the Regulations, and with prior agreement in PP with the Bank. The short list may consist of all National consultants in case the estimated cost is less than USD 300,000 Procurement methods for Selection of Individual Consultants (IC): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Open Competitive As per requirements of para 7.36 and 7.37 of Selection the Regulations Limited Competitive As per requirements of para 7.38 of the Selection Regulations Direct Must meet the requirements of Para 7.39 of the Regulations, and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Regulations Prior Review Thresholds: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 0.5 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.2 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. PROCUREMENT Kenya : National Agricultural and Rural Inclusive Growth Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2019-10-02 2021-05-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153349 GPN Date: 2018-02-09 Project Name: National Agricultural and Rural Inclusive Growth Project Loan / Credit No: IDA / 59000 E Executing Agency(ies): mbu County WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-EMBU COUNTY-137530- Under Project Coordination and Request for Single Stage - One 2020-06- CW-RFQ / Maintenance of IDA / 59000 Post Limited 21,734.84 0.00 Implementat 2019-10-21 2019-12-02 2019-12-07 Management Quotations Envelope 04 building ion KE-EMBU COUNTY-137568- Supporting County CW-RFB / Civil works for Single Stage - One 2020-08- IDA / 59000 Community-Led Post Request for Bids Open - National 801,719.03 0.00 Canceled 2019-10-30 2019-11-04 2019-12-04 2020-01-03 2020-02-07 Rupingazi - weru Irrigation Envelope 05 Development Scheme KE-EMBU COUNTY-173636- Supporting County Under CW-RFB / Civil works for Single Stage - One 2021-06- IDA / 59000 Community-Led Post Request for Bids Open - National 1,490,000.00 0.00 Implementat 2020-05-22 2020-06-02 2020-05-28 2020-06-16 2020-06-23 2020-06-21 2020-06-29 2020-06-29 Rupingazi - Weru Irrigation Envelope 30 Development ion Scheme. KE-EMBU COUNTY-192245- Supporting County CW-RFB / Procurement for the Single Stage - One 2021-04- IDA / 59000 Community-Led Post Request for Bids Open - National 160,000.00 0.00 Canceled 2020-09-08 2020-12-17 2020-09-11 2021-03-09 2020-09-30 2020-10-08 2020-10-29 disilting of Gitinangugu Envelope 27 Development concrete dam. KE-EMBU COUNTY-222788- Under Supporting Community- Request for Single Stage - One 2021-10- CW-RFQ / Construction of IDA / 59000 Post Limited 140,000.00 0.00 Implementat 2021-03-08 2021-05-20 2021-04-05 Driven Development Quotations Envelope 02 ITIIRA-KAGUMORI EARTH ion DAM KE-EMBU COUNTY-222776- Under CW-RFQ / Proposed desilting Supporting Community- Request for Single Stage - One 2021-10- IDA / 59000 Post Limited 140,000.00 0.00 Implementat 2021-03-05 2021-03-31 2021-04-24 of Gitinangugu Reinforced Driven Development Quotations Envelope 21 ion concrete dam at Mbeere south KE-EMBU COUNTY-233017- Request for CW-RFQ / Construction of 15 Quotations - Small Pending Supporting Community- Request for Single Stage - One 2021-09- No Farm ponds 1000m3 for IDA / 59000 Post Limited Works 45,000.00 0.00 Implementat 2021-05-10 2021-06-07 Driven Development Quotations Envelope 05 SLM activities in Gitinangugu (Emergency) SPD - ion catchments Competitive GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-EMBU COUNTY-137430- Under Project Coordination and Request for Single Stage - One GO-RFQ / purchase of office IDA / 59000 Post Limited 18,820.39 0.00 Implementati 2019-10-19 2019-10-23 2019-12-05 2020-06-02 Management Quotations Envelope furniture and fittings on KE-EMBU COUNTY-137945- Supporting County Under GO-RFB / Agricultural Request for Single Stage - One IDA / 59000 Community-Led Post Limited 61,005.73 0.00 Implementati 2020-01-27 2020-07-27 2020-02-21 2020-05-31 materials supplies and small Quotations Envelope Development on Equipment KE-EMBU COUNTY-172311- Under GO-RFQ / Supply , delivery Project Coordination and Request for Single Stage - One IDA / 59000 Post Limited 90,000.00 0.00 Implementati 2020-05-13 2020-06-09 2020-05-29 2020-06-03 and Installation of of I.C.T Management Quotations Envelope on Equipment KE-EMBU COUNTY-180187- Pending Project Coordination and Request for Single Stage - One GO-RFQ / procurement of IDA / 59000 Post Limited 80,000.00 0.00 Implementati 2020-09-04 2020-09-19 2020-10-19 Management Quotations Envelope motorcycles on KE-EMBU COUNTY-207853- Pending Supporting Community- Request for Single Stage - One GO-RFQ / supply and delivery IDA / 59000 Post Limited 10,000.00 0.00 Implementati 2020-12-10 2020-12-11 2021-01-10 Driven Development Quotations Envelope of filling cabinets for CDDC on KE-EMBU COUNTY-233187- GO-RFQ / Procurement of Strengthening Producer Pending Request for Single Stage - One pick-up for aggregation of IDA / 59000 Organizations and Value Post Limited 49,000.00 0.00 Implementati 2021-05-10 2021-06-04 2021-09-02 Quotations Envelope milk at Kawanjara Commercial Chain Development on Village . NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-EMBU COUNTY-175743- Consultant CS-CQS / Recruitment of Supporting Community- Under IDA / 59000 Post Qualification Open - National 50,000.00 0.00 2020-05-24 2020-06-10 2020-05-27 2020-06-19 2020-06-22 2020-06-29 2021-09-30 service provider for Dairy Driven Development Implementation Selection Value chain . Page 1 KE-EMBU COUNTY-175744- Consultant CS-CQS / Recruitment of Supporting Community- Under IDA / 59000 Post Qualification Open - National 50,000.00 0.00 2020-05-24 2020-06-10 2020-05-27 2020-06-19 2020-06-22 2020-06-29 2021-09-30 service provider for Driven Development Implementation Selection greengram value chain KE-EMBU COUNTY-175745- Consultant CS-CQS / Recruitment of Supporting Community- Under IDA / 59000 Post Qualification Open - National 50,000.00 0.00 2020-05-24 2020-06-10 2020-05-27 2020-06-19 2020-06-22 2020-06-29 2021-09-30 service provider for mango Driven Development Implementation Selection value chain KE-EMBU COUNTY-175747- Consultant CS-CQS / Recruitment of Supporting Community- Under IDA / 59000 Post Qualification Open - National 50,000.00 0.00 2020-05-24 2020-06-10 2020-05-27 2020-06-19 2020-06-22 2020-07-16 2021-10-03 service provider for local Driven Development Implementation Selection chicken value chain INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Plan de Passations des Marchés (partie contextuelle) 1. Pays : République Islamique de Mauritanie 2. Project:Assistance technique en appui au développement des projets gaziers et renforcement des capacités institutionnelles (PADG)(P163563) 3. Unité de Gestion du Projet : Unité de Gestion du Projet ancrée chez le Ministère du Pétrole, de l'Energie et des Mines 4. Date du Plan de passations de marché : le 28 février 2018 5. Plan de passations de marché :du 26 mars 2018 au 26septembre 2019 Préambule Conformément au paragraphe 5.9 du « Règle de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projet d’Investissement (FPI) : Fournitures, Travaux, Services Autres que des Services de Consultants et Services de Consultants » [Juillet 2016, Banque mondiale], le système STEP (SystematicTracking and Exchanges in Procurement) de la Banque mondiale sera utilisé pour préparer, clarifier et mettre à jour les plans de passation des marchés et effectuer toutes les transactions de passation des marchés pour le Projet PADG. Cette partie textuelle ainsi que les tableaux du Plan de Passations des Marchés dans le STEP constituent le Plan de Passations des Marchés du Projet. Les conditions suivantes s'appliquent à toutes les marchés dans le Plan de Passations des Marchés. Les autres éléments du Plan de Passations des Marchés requis en vertu du paragraphe 4.4 du «Règle de Passation des Marchés » sont énoncés dans le STEP. Les documents standard de Passation des Marchés de la Banque mondiale : seront utilisés pour tous les marchés soumis à la concurrence internationale et pour les marchés spécifiés dans les tableaux du Plan de Passation des Marchés dans le STEP. Arrangements nationaux de la Passation des Marchés Conformément au paragraphe 5.3 du « Règle de Passation des Marchés », lorsque l'on s'approche du marché national (comme indiqué dans les tableaux du Plan de Passation des Marchés du STEP), les procédures de la passation des marchés du pays (à savoir la Mauritanie) ne peuvent être utilisées qu’après une évaluation desdites procédures et accord de la Banque mondiale. Lorsque l'Emprunteur utilise ses propres dispositions nationales en matière de marchés publics ouverts à la concurrence, telles qu'elles sont énoncées dans le décret Numéro 2017-126 du 02 Novembre 2017, ces dispositions sont soumises au paragraphe 5.4 du « Règle de Passation des Marchés ». Lorsque l'Emprunteur applique d'autres arrangements nationaux de passation de marchés que les arrangements nationaux ouverts à la concurrence, ces arrangements sont soumis au paragraphe 5.5 du« Règle de Passation des Marchés ». Biens loués conformément au paragraphe 5.10 du « Règle de Passation des Marchés »: Le crédit-bail peut être utilisé pour les contrats indiqués dans les tableaux du Plan de Passations des Marchés "Sans objet (not applicable)". L'achat de biens d'occasion tel que spécifié au paragraphe 5.11 du « Règle de Passation des Marchés » est autorisé pour les marchés identifiés dans les tableaux du Plan de Passations des Marchés "Sans objet (not applicable)". Préférence nationale telle que spécifiée au paragraphe 5.51 du « Règle de Passation des Marchés » (biens et travaux). Préciser pour chaque Marchandises : ne s'applique pas Travaux : ne s'applique pas Hands-on Expanded Implementation Support (HEIS)as specified under paragraphs 3.10 and 3.11of the Procurement Regulations is not Applicable. L'appui pratique à la mise en œuvre élargie (Hands-on ExpandedImplementation Support, HEIS), tel que spécifié aux paragraphes 3.10 et 3.11 du « Règle de Passation des Marchés »sur les marchés publics, ne s'applique pas. PROCUREMENT Mauritania : Supporting Gas Project Negotiations and Enhancing Institutional Capacities PLAN General Information Country: Mauritania Bank’s Approval Date of the Original Procurement Plan: 2018-05-07 2021-05-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163563 GPN Date: Project Name: Supporting Gas Project Negotiations and Enhancing Institutional Capacities Loan / Credit No: IDA / D2730 Supporting Gas Project Negotiations and Enhancing Institutional Capacities Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MR-PADG-112029-GO- Project management and DIR / Acquisition du logiciel IDA / D2730 Prior Direct Selection Direct 13,041.79 Signed 2019-04-26 2020-04-29 2019-05-01 2020-06-17 2019-06-05 2020-05-29 2019-12-02 coordination TOM2PRO MR-MR-PADG-54685-GO- RFB / Equipement d'une salle Strengthening of the de vidéo conférence avec la Request for Single Stage - One IDA / D2730 institutional and regulatory Post Limited 0.00 Canceled 2019-03-18 2019-05-13 2019-11-09 prise en charge de Quotations Envelope framework l'abonnement VSAT pendant 3 ans MR-MR-PADG-135965-GO- RFB / Equipement de deux Strengthening of the salles de vidéo conférence Single Stage - One IDA / D2730 institutional and regulatory Post Request for Bids Open - National 0.00 Canceled 2019-09-30 2019-11-28 2019-10-05 2019-11-16 2019-12-16 2020-01-20 2020-07-18 avec la prise en charge de Envelope framework l’abonnement VSAT pendant 3 ans MR-MR-PADG-54568-GO- RFB / Plateforme de Strengthening of the Single Stage - One modélisation d'un centre de IDA / D2730 institutional and regulatory Prior Request for Bids Open - International 0.00 Canceled 2019-02-13 2019-02-18 2019-04-01 2019-05-01 2019-06-05 2019-12-02 Envelope documentation (protocole framework stockage et de forage MR-MR-PADG-54682-GO- RFB / Equipement d'un centre Strengthening of the Single Stage - One documentaire IDA / D2730 institutional and regulatory Post Request for Bids Open - International 0.00 Canceled 2019-03-13 2019-03-18 2019-04-29 2019-05-29 2019-07-03 2019-12-30 Envelope (cartothèque)avec un logiciel framework et assistance de 6 mois MR-MR-PADG-54569-GO- Strengthening of the Single Stage - One RFB / Système d'information IDA / D2730 institutional and regulatory Post Request for Bids Open - International 0.00 Canceled 2019-02-13 2019-02-18 2019-04-01 2019-05-01 2019-06-05 2019-12-02 Envelope et de gestion intégréERP framework MR-MR-PADG-153638-GO- Capacity building and RFB / Equipement d'une salle Single Stage - One IDA / D2730 technical support for the GTA Post Request for Bids Open - National 0.00 Canceled 2020-04-02 2020-04-07 2020-05-19 2020-06-18 2020-07-23 2021-01-19 de vidéo-conférence pour le Envelope negotiations MPME MR-MR-PADG-153639-GO- RFB / Equipement d’un centre Capacity building and Single Stage - One documentaire (cartothèque) IDA / D2730 technical support for the GTA Post Request for Bids Open - International 0.00 Canceled 2020-07-13 2020-07-18 2020-08-29 2020-09-28 2020-11-02 2021-05-01 Envelope avec un logiciel et assistance negotiations de 6 mois. MR-MR-PADG-153649-GO- Capacity building and Single Stage - One RFB / Système d’information IDA / D2730 technical support for the GTA Post Request for Bids Open - International 0.00 Canceled 2020-07-13 2020-07-18 2020-08-29 2020-09-28 2020-11-02 2021-05-01 Envelope et de gestion intégrée ERP negotiations MR-MR-PADG-154337-GO- RFB / Plate Forme Capacity building and Single Stage - One informatique pour la IDA / D2730 technical support for the GTA Post Request for Bids Open - International 0.00 Canceled 2020-04-01 2020-04-06 2020-05-18 2020-06-17 2020-07-22 2021-01-18 Envelope modélisation réservoir pour la negotiations SMHPM MR-MR-PADG-171693-GO- RFQ / Achat de matériel Strengthening of the informatique et de bureau Request for Single Stage - One IDA / D2730 institutional and regulatory Post Limited 27,194.69 Completed 2020-05-10 2020-05-13 2020-07-05 2020-05-26 2021-01-01 2020-06-17 pour la Commission Nationale Quotations Envelope framework de Contrôle des Marchés publics (CNCMP) MR-MR-PADG-171707-GO- Project management and Request for Single Stage - One RFQ / Achat de Matériel de IDA / D2730 Post Limited 5,175.55 Signed 2020-05-10 2020-05-25 2020-07-05 2020-05-28 2021-01-01 coordination Quotations Envelope protection MR-MR-PADG-172678-GO- RFQ / Achat du Matériel Project management and Request for Single Stage - One informatique pour le Projet et IDA / D2730 Post Limited 21,784.36 Completed 2020-05-12 2019-08-09 2020-07-07 2020-02-06 2021-01-03 2020-03-04 coordination Quotations Envelope la Commission des Marchés du Département MR-MR-PADG-171704-GO- RFB / Achat de fourniture et Project management and Single Stage - One IDA / D2730 Post Request for Bids Open - National 0.00 Canceled 2020-05-05 2020-05-10 2020-06-21 2020-07-21 2020-08-25 2021-02-21 consommables de bureaux coordination Envelope pour le projet MR-MR-PADG-177934-GO- Project management and Request for Single Stage - One RFQ / Achat d’équipement IDA / D2730 Post Limited 5,846.58 Completed 2020-06-16 2020-07-22 2020-08-11 2020-08-18 2021-02-07 2020-09-01 coordination Quotations Envelope des bureaux pour le PADG Page 1 MR-MR-PADG-178147-GO- RFB / Equipement de salles de vidéo conférences pour Capacity building and des départements ministériels Single Stage - One IDA / D2730 technical support for the GTA Post Request for Bids Open - National 0.00 Canceled 2020-06-29 2020-07-04 2020-08-15 2020-09-14 2020-10-19 2021-04-17 concernés par le Envelope negotiations développement de GTA pour faire face aux contraintes de la Covid 19 MR-MR-PADG-182067-GO- Capacity building and RFQ / Équipements Request for Single Stage - One IDA / D2730 technical support for the GTA Post Limited 22,194.71 Completed 2020-07-11 2020-07-08 2020-09-05 2020-08-11 2021-03-04 2020-08-18 informatiques pour la CNCMP, Quotations Envelope negotiations le PADG et le MPME MR-MR-PADG-190274-GO- Strengthening of the Under Request for Single Stage - One RFQ / Abonnement annuel en IDA / D2730 institutional and regulatory Post Limited 0.00 Implementati 2020-09-08 2020-09-14 2020-11-03 2021-05-02 Quotations Envelope Fibre optique pour MPME framework on MR-MR-PADG-204072-GO- RFB / Acquisition Capacity building and Under Single Stage - One d'équipement des salles de IDA / D2730 technical support for the GTA Post Request for Bids Open - National 0.00 Implementati 2020-11-30 2021-03-26 2020-12-05 2021-04-01 2021-01-16 2021-02-15 2021-03-22 2021-09-18 Envelope vidéo-conférence et negotiations on équipement informatique MR-MR-PADG-227994-GO- Capacity building and Pending Single Stage - One RFB / Acquisition d’un ERP IDA / D2730 technical support for the GTA Post Request for Bids Open - International 0.00 Implementati 2021-06-07 2021-06-12 2021-07-24 2021-08-23 2021-09-27 2022-03-26 Envelope pour la SMH negotiations on MR-MR-PADG-227993-GO- Capacity building and Pending Single Stage - One RFB / Equipement d'un centre IDA / D2730 technical support for the GTA Post Request for Bids Open - International 0.00 Implementati 2021-08-10 2021-08-15 2021-09-26 2021-10-26 2021-11-30 2022-05-29 Envelope documentaire pour la SMH negotiations on MR-MR-PADG-185737-GO- RFQ / Équipements Capacity building and informatique pour les cellules Single Stage - One IDA / D2730 technical support for the GTA Post Request for Bids Open - National 0.00 Canceled 2020-08-04 2020-08-09 2020-09-20 2020-10-20 2020-11-24 2021-05-23 chargées de la gestion des Envelope negotiations Centres de Développement de Compétence (CDC) du CSET MR-MR-PADG-228732-GO- Pending RFQ / Acha du matériel Project management and Request for Single Stage - One IDA / D2730 Post Limited 0.00 Implementati 2021-06-05 2021-07-31 2022-01-27 informatique pour le PADG et coordination Quotations Envelope on la CPMP MR-MR-PADG-233533-GO- Capacity building and Pending RFQ / Acquisition d'un Request for Single Stage - One IDA / D2730 technical support for the GTA Post Limited 0.00 Implementati 2021-06-05 2021-07-31 2022-01-27 Système d'Information Quotations Envelope negotiations on Géologie MR-MR-PADG-207494-GO- RFB / Acquisition Strengthening of the Pending Single Stage - One d'équipements télécoms pour IDA / D2730 institutional and regulatory Post Request for Bids Open - National 0.00 Implementati 2021-06-14 2021-06-19 2021-07-31 2021-08-30 2021-10-04 2022-04-02 Envelope la connexion du MPME à la framework on fibre optique MR-MR-PADG-233751-GO- Capacity building and Pending RFQ / Recrutement d'un Request for Single Stage - One IDA / D2730 technical support for the GTA Post Limited 0.00 Implementati 2021-05-24 2021-07-19 2022-01-15 prestataire de service pour Quotations Envelope negotiations on l'organisation d'un atelier MR-MR-PADG-233752-GO- Strengthening of the Request for Single Stage - One RFQ / Achat du matériel de IDA / D2730 institutional and regulatory Post Limited 20,730.69 Signed 2021-05-24 2021-05-28 2021-07-19 2021-06-16 2022-01-15 Quotations Envelope bureaux framework NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MR-PADG-204848-NC- RFQ / Achat de matériel Project management and Request for Single Stage - One IDA / D2730 Post Limited 23,299.48 Terminated 2020-12-08 2019-10-29 2021-02-02 2020-02-06 2021-08-01 informatique pour la CMD et coordination Quotations Envelope le PADG CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MR-PADG-54521-CS- QCBS / Recrutement d'un cabinet du Conseil spécialisé Capacity building and Quality And Cost- dans l"analyse de IDA / D2730 technical support for the GTA Post Open - International 899,760.00 Signed 2018-04-12 2018-06-04 2018-05-03 2018-06-07 2018-06-16 2021-04-20 2018-07-14 2020-12-20 2018-08-13 2021-04-21 2018-09-17 2021-02-24 2018-10-22 2021-03-11 2019-10-22 Based Selection commercialisation du gaz negotiations naturel et de GNL dans le monde entier MR-MR-PADG-65454-CS- Consultant CQS / Recrutement de cabinet Project management and IDA / D2730 Post Qualification Open - National 66,538.12 Completed 2018-06-07 2018-06-15 2018-06-12 2018-07-26 2018-09-24 2018-08-25 2018-09-27 2018-09-29 2018-10-10 2019-03-28 2020-04-08 pour une assistance en coordination Selection passation des marchés MR-MR-PADG-88191-CS- CQS / Recrutement d'un Consultant Cabinet chargé de développer Project management and IDA / D2730 Post Qualification Open - National 36,096.65 Completed 2018-11-26 2018-10-22 2018-12-17 2019-01-30 2018-12-13 2019-03-01 2019-02-13 2019-04-05 2019-02-15 2019-10-02 2020-04-30 un manuel de procédures coordination Selection administratives financières et comptable du projet MR-MR-PADG-54476-CS- QCBS / Recrutement d'un cabinet de conseil spécialisé dans les affaires juridiques et Capacity building and Quality And Cost- Under fiscales dans l'industrie du IDA / D2730 technical support for the GTA Post Open - International 0.00 2019-01-10 2019-04-23 2019-01-31 2019-05-30 2019-03-16 2020-05-04 2019-04-13 2020-07-27 2019-05-13 2021-01-19 2019-06-17 2019-07-22 2020-07-21 Based Selection Implementation pétrole et du gaz et dans le negotiations financement amont du gaz et le financement de projets de liquéfaction du gaz Page 2 MR-MR-PADG-54504-CS- QCBS / Recrutement d'un Capacity building and cabinet de conseil spécialisé Quality And Cost- IDA / D2730 technical support for the GTA Prior Open - International 0.00 Canceled 2018-04-06 2018-06-04 2018-04-27 2018-06-10 2018-07-08 2018-08-07 2018-09-11 2018-10-16 2019-10-16 dans le financement amont du Based Selection negotiations gaz et le financement des projets de liquéfaction du gaz MR-MR-PADG-88667-CS- CQS / Recrutement d'un cabinet d'Experts en analyse Capacity building and Consultant de marché du gaz naturel et IDA / D2730 technical support for the GTA Post Qualification Open - International 537,013.36 Signed 2019-01-01 2019-01-14 2019-01-04 2019-02-17 2019-04-04 2019-03-19 2019-06-14 2019-04-23 2019-07-05 2019-10-20 en commercialisation du GNL negotiations Selection pour assister la Mauritanie dans la Phase I du GTA MR-MR-PADG-88669-CS- CQS / Recrutement d'un Capacity building and Consultant consultant spécialisé pour IDA / D2730 technical support for the GTA Post Qualification Open - International 366,042.06 Signed 2019-01-01 2019-11-16 2019-01-04 2019-02-17 2019-04-04 2019-03-19 2019-11-30 2019-04-23 2020-03-02 2019-10-20 dispenser des formations negotiations Selection pour les équipes de négociations relatives au projet gazier GTA MR-MR-PADG-88775-CS- CQS / Recrutement d'un cabinet de conseil spécialisé Capacity building and Consultant pour l'élaboration d'une IDA / D2730 technical support for the GTA Post Qualification Open - International 292,400.00 Completed 2018-12-10 2019-04-26 2019-01-07 2019-02-20 2019-07-01 2019-03-22 2019-12-09 2019-04-26 2020-03-13 2019-10-23 2020-11-09 stratégie de mise en œuvre negotiations Selection d'une zone d'activités et de services dédiée au secteur des hydrocarbures MR-MR-PADG-54517-CS- QCBS / Recrutement d'une Capacity building and Quality And Cost- compagnie spécialisée dans IDA / D2730 technical support for the GTA Prior Open - International 0.00 Canceled 2018-04-06 2018-04-27 2018-06-10 2018-07-08 2018-08-07 2018-09-11 2018-10-16 2019-10-16 Based Selection les projets gaziers en haute negotiations mer et dans les projets GNL MR-MR-PADG-54535-CS- QCBS / Recrutement d'un cabinet d'un conseil spécialisé Strengthening of the Quality And Cost- pour le développement d'une IDA / D2730 institutional and regulatory Prior Open - International 0.00 Canceled 2018-06-20 2018-07-11 2018-08-24 2018-09-21 2018-10-21 2018-11-25 2018-12-30 2019-12-30 Based Selection stratégie pour la création du framework contenu local dans le secteur pétrole gaz MR-MR-PADG-54478-CS- QCBS / recrutement d'un Capacity building and cabinet de conseil spécialisé Quality And Cost- IDA / D2730 technical support for the GTA Prior Open - International 0.00 Canceled 2018-03-27 2018-06-28 2018-04-17 2018-08-03 2018-05-31 2018-06-28 2018-07-28 2018-09-01 2018-10-06 2019-10-06 dans ingénierie du bassin, la Based Selection negotiations certification et l'exploitation en commun de réserves MR-MR-PADG-93446-CS- CQS / Recrutement d'un Strengthening of the Consultant cabinet pour l'élaboration IDA / D2730 institutional and regulatory Post Qualification Open - International 291,805.20 Signed 2019-01-25 2020-01-25 2019-02-15 2020-11-18 2019-03-31 2020-12-30 2019-04-30 2021-01-30 2019-06-04 2021-03-11 2019-12-01 d'un manuel de procédures framework Selection technico-décisionnelles pour la SMHPM et le MPEMi MR-MR-PADG-54556-CS- Project management and Least Cost QCBS / Recrutement d'un IDA / D2730 Prior Open - National 0.00 Canceled 2019-02-27 2019-05-01 2019-03-20 2019-05-03 2019-05-31 2019-06-30 2019-08-04 2019-09-08 2020-03-06 coordination Selection cabinet d'Audit MR-MR-PADG-54530-CS- QCBS / Recrutement d'un Capacity building and Quality And Cost- cabinet spécialisé pour la IDA / D2730 technical support for the GTA Post Open - International 381,706.67 Signed 2019-01-16 2019-08-01 2019-02-06 2019-08-15 2019-03-22 2020-02-07 2019-04-19 2020-05-21 2019-05-19 2020-10-15 2019-06-23 2021-02-11 2019-07-28 2021-03-11 2020-07-27 Based Selection réalisation d'un master plan negotiations Pétrole gaz (y compris GNL) MR-MR-PADG-108244-CS- CQS / Recrutement d'un Consultant (firme) chargé de Strengthening of the Consultant l'élaboration du cahier de IDA / D2730 institutional and regulatory Post Qualification Open - International 192,277.80 Signed 2019-04-08 2019-04-23 2019-04-29 2019-06-12 2019-07-09 2019-07-12 2020-05-05 2019-08-16 2020-05-22 2020-02-12 charge pour l'acquisition d'un framework Selection système d'information et de gestion intégrée ERP MR-MR-PADG-54527-CS- QCBS / Recrutement d'un cabinet de conseil spécialisé dans le pétrole et le gaz (y compris GNL) chargé de Strengthening of the Consultant développer une évaluation des IDA / D2730 institutional and regulatory Post Qualification Open - International 434,559.80 Signed 2019-04-11 2019-03-29 2019-05-02 2019-06-15 2019-07-12 2019-07-15 2020-04-18 2019-08-19 2020-06-30 2020-02-15 besoins institutionnels, framework Selection d'élaborer une stratégie d'affaires pour la SMHPM, de l'identification des besoins en Ressources Huma MR-MR-PADG-112123-CS- CQS / ELABORATION ET MISE Capacity building and Consultant EN OEUVRE D'ACTIONS IDA / D2730 technical support for the GTA Post Qualification Open - National 37,846.77 Signed 2019-04-29 2019-04-15 2019-05-20 2019-07-03 2019-08-28 2019-08-02 2019-10-16 2019-09-06 2019-11-01 2020-03-04 PRIORITAIRES DE negotiations Selection COMMUNICATION GTA - COURT TERME MR-MR-PADG-138653-CS- Consultant Project management and CQS / Recrutement d'un IDA / D2730 Post Qualification Open - National 23,892.46 Completed 2019-10-07 2019-05-01 2019-10-28 2019-12-11 2019-12-13 2020-01-10 2020-04-29 2020-02-14 2020-05-08 2020-08-12 2020-08-11 coordination cabinet d'Audit Selection MR-MR-PADG-89711-CS- CQS / Recrutement d'un cabinet de conseil spécialisé Strengthening of the Consultant pour le développement d'une IDA / D2730 institutional and regulatory Post Qualification Open - International 0.00 Canceled 2019-01-01 2019-04-23 2019-01-21 2019-03-06 2019-04-05 2019-05-10 2019-11-06 stratégie pour la création de framework Selection contenu local dans le secteur pétrole-gaz MR-MR-PADG-108243-CS- CQS / Consultant pour Strengthening of the Consultant l'élaboration d'un cahier de IDA / D2730 institutional and regulatory Post Qualification Open - International 0.00 Canceled 2019-04-15 2019-06-27 2019-05-06 2019-07-26 2019-06-19 2019-07-19 2019-08-23 2020-02-19 charges pour la mise en place framework Selection d'un centre documentaire Page 3 MR-MR-PADG-54553-CS- INDV / Recrutement d'un Consultant Project management and consultant chargé de IDA / D2730 Post Qualification Open - International 0.00 Canceled 2019-01-15 2019-02-05 2019-03-21 2019-04-20 2019-05-25 2019-11-21 coordination développer le manuel Selection d'exécution projet MR-MR-PADG-154332-CS- QCBS / Recrutement d’un cabinet de conseil spécialisé Capacity building and Quality And Cost- pour le développement d’une IDA / D2730 technical support for the GTA Post Open - International 0.00 Canceled 2020-02-17 2020-03-09 2020-04-22 2020-05-20 2020-06-19 2020-07-24 2020-08-28 2021-08-28 Based Selection stratégie pour la création de negotiations contenu local dans le secteur des industries extractives MR-MR-PADG-163722-CS- CQS / Recrutement d'un Capacity building and Consultant cabinet spécialisé pour le IDA / D2730 technical support for the GTA Post Qualification Open 449,000.00 Signed 2020-03-13 2020-06-30 2020-04-03 2020-07-29 2020-05-17 2020-11-30 2020-06-16 2021-02-09 2020-07-21 2021-03-26 2021-01-17 développement d'une negotiations Selection stratégie de contenu local dans les industries extractives MR-MR-PADG-163976-CS- Capacity building and Consultant CQS / Recrutement d'un IDA / D2730 technical support for the GTA Post Qualification Limited 0.00 Canceled 2020-03-16 2020-03-16 2020-03-30 2020-04-29 2020-06-03 2020-11-30 traducteur arabe-français negotiations Selection MR-MR-PADG-54529-CS- Strengthening of the QCBS / Recrutement d'un Quality And Cost- IDA / D2730 institutional and regulatory Prior Open - International 0.00 Canceled 2019-02-21 2019-03-14 2019-04-27 2019-05-25 2019-06-24 2019-07-29 2019-09-02 2020-09-01 cabinet pour l'exécution du Based Selection framework plan de Formation MR-MR-PADG-83929-CS- CQS / Recrutement d'un Capacity building and Consultant consultant (firme) pour IDA / D2730 technical support for the GTA Post Qualification Open - National 0.00 Canceled 2018-10-26 2018-10-26 2018-11-14 2018-12-14 2019-01-18 2019-07-17 l'Analyse du Rapport Etudes negotiations Selection d'Impact Environnementale du Projet Ahmeyim/Guembeul MR-MR-PADG-172817-CS- Strengthening of the Consultant CQS / Etude de faisabilité IDA / D2730 institutional and regulatory Post Qualification Open - International 253,798.64 Signed 2020-05-18 2020-07-14 2020-06-08 2020-07-30 2020-07-22 2020-09-26 2020-08-21 2020-11-13 2020-09-25 2020-12-21 2021-03-24 pour la création d’un Institut framework Selection Spécialisé des Technologies MR-MR-PADG-172819-CS- CQS / Etude de faisabilité pour la création d’une Ecole Strengthening of the Consultant de Formation dans les Métiers IDA / D2730 institutional and regulatory Post Qualification Open - International 329,900.00 Signed 2020-05-18 2020-07-20 2020-06-08 2020-07-30 2020-07-22 2020-10-28 2020-08-21 2021-01-26 2020-09-25 2021-05-07 2021-03-24 des Services et des framework Selection Technologies de l’Information et de la Communication à Nouadhibou MR-MR-PADG-54536-CS- QCBS / Recrutement d'un cabinet de conseil spécialisé Strengthening of the Consultant pour le développement d'une IDA / D2730 institutional and regulatory Post Qualification Open - International 0.00 Canceled 2019-01-07 2019-01-28 2019-03-13 2019-04-12 2019-05-17 2019-11-13 stratégie de communication et framework Selection d'une compagne d'information visant a engager les acteurs clés du secteur pétrole et gaz MR-MR-PADG-177903-CS- QCBS / Recrutement d'un cabinet de conseil spécialisé Capacity building and pour le développement d'une Quality And Cost- Under IDA / D2730 technical support for the GTA Post Open - International 0.00 2020-07-01 2020-06-30 2020-07-22 2020-10-01 2020-09-04 2021-02-09 2020-10-02 2021-03-29 2020-11-01 2020-12-06 2021-01-10 2022-01-10 stratégie de communication et Based Selection Implementation negotiations d'une compagne d'information visant a engager les acteurs clés du secteur pétrole et gaz MR-MR-PADG-182168-CS- CQS / Recrutement d'un Capacity building and Consultant Consultant Firme pour la IDA / D2730 technical support for the GTA Post Qualification Open - International 316,542.08 Signed 2020-07-13 2020-07-24 2020-08-03 2020-12-02 2020-09-16 2021-01-20 2020-10-16 2020-03-15 2020-11-20 2021-05-18 2021-05-19 certification des structures de negotiations Selection formation professionnelle MR-MR-PADG-154336-CS- QCBS / Recrutement d'un Capacity building and Quality And Cost- cabinet pour une étude des IDA / D2730 technical support for the GTA Post Open - International 0.00 Canceled 2020-01-17 2020-02-07 2020-03-22 2020-04-19 2020-05-19 2020-06-23 2020-07-28 2021-07-28 Based Selection options de développement de negotiations BirAllah MR-MR-PADG-108273-CS- CQS / Recrutement d'un Strengthening of the Consultant Consultants pour la formation IDA / D2730 institutional and regulatory Post Qualification Open - International 0.00 Canceled 2019-05-06 2019-05-27 2019-07-10 2019-08-09 2019-09-13 2020-03-11 de techniciens spécialisés framework Selection dans les domaines liés au gaz et pétrole MR-MR-PADG-54532-CS- QCBS / Recrutement d'un Capacity building and Consultant cabinet de conseil spécialisé IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 Canceled 2019-01-16 2019-02-06 2019-03-22 2019-04-21 2019-05-26 2019-11-22 pour la réalisation d'études negotiations Selection sur les option de gestion des revenus gaziers MR-MR-PADG-153801-CS- CQS / Recrutement d'un Consultant Project management and cabinet pour le IDA / D2730 Post Qualification Open - National 0.00 Canceled 2020-01-20 2020-02-10 2020-03-25 2020-04-24 2020-05-29 2020-11-25 coordination développement du Manuel Selection d’exécution du projet MR-MR-PADG-153527-CS- QCBS / Recrutement d’un Strengthening of the cabinet pour accompagner la Quality And Cost- IDA / D2730 institutional and regulatory Post Open - International 0.00 Canceled 2020-07-15 2020-08-05 2020-09-18 2020-10-16 2020-11-15 2020-12-20 2021-01-24 2022-01-24 SMHPM dans un programme Based Selection framework de certification management de qualité MR-MR-PADG-153656-CS- QCBS / Recrutement d’un cabinet pour l’Élaboration Capacity building and Quality And Cost- d’une nouvelle stratégie de IDA / D2730 technical support for the GTA Post Open - International 0.00 Canceled 2020-03-02 2020-03-23 2020-05-06 2020-06-03 2020-07-03 2020-08-07 2020-09-11 2021-09-11 Based Selection promotion et d’Exploration negotiations des blocs On shore du bassin côtier Page 4 MR-MR-PADG-153525-CS- CQS / Recrutement de cabinet Strengthening of the Consultant l'élaboration d’un cahier de IDA / D2730 institutional and regulatory Post Qualification Open - International 0.00 Canceled 2020-03-05 2020-03-26 2020-05-09 2020-06-08 2020-07-13 2021-01-09 charge pour la certification framework Selection management de qualité de la SMHPM MR-MR-PADG-182105-CS- LCS / Recrutement d'un Project management and Least Cost cabinet d'Audit pour l’Audit IDA / D2730 Post Open - International 16,613.46 Signed 2020-07-20 2020-08-10 2020-08-10 2020-10-09 2020-09-23 2020-12-22 2020-10-21 2021-02-09 2020-11-20 2021-02-16 2020-12-25 2021-03-29 2021-01-29 2021-04-27 2021-07-28 coordination Selection du projet (Exercices 2020/2021/2022) MR-MR-PADG-89847-CS- QCBS / Recrutement d'un cabinet de conseil spécialisé Capacity building and Quality And Cost- dans la revue du plan de IDA / D2730 technical support for the GTA Prior Open - International 0.00 Canceled 2019-01-14 2019-06-25 2019-02-04 2019-08-08 2019-03-20 2020-04-28 2019-04-17 2019-05-17 2019-06-21 2019-07-26 2020-07-25 Based Selection développement des negotiations prochaines phases de GTA (Phases II et III de GTA) MR-MR-PADG-197705-CS- QCBS / Recrutement d'un Capacity building and cabinet pour la réalisation Quality And Cost- Under IDA / D2730 technical support for the GTA Post Open - International 0.00 2020-10-26 2021-02-22 2020-11-16 2021-03-12 2020-12-30 2021-01-27 2021-02-26 2021-04-02 2021-05-07 2022-05-07 d'une Évaluation Stratégique Based Selection Implementation negotiations Sociale et Environnementale du secteur pétrolier et gazier MR-MR-PADG-197703-CS- QCBS / Recrutement d'un Capacity building and cabinet de conseil spécialisé Quality And Cost- Under IDA / D2730 technical support for the GTA Post Open - International 0.00 2020-11-17 2020-12-29 2020-12-08 2021-01-21 2021-06-15 2021-02-18 2021-03-20 2021-04-24 2021-05-29 2022-05-29 pour la revue du plan de Based Selection Implementation negotiations développement de la phase 2 du Projet GTA MR-MR-PADG-207417-CS- CQS / Recrutement d'un Capacity building and Consultant Consultant pour le Under IDA / D2730 technical support for the GTA Post Qualification Limited 0.00 2020-12-15 2021-02-18 2020-12-29 2021-01-28 2021-03-04 2021-08-31 Développement d'une vision Implementation negotiations Selection stratégique du secteur du pétrole et de l'énergie MR-MR-PADG-207416-CS- CQS / Recrutement d'une Capacity building and Consultant firme pour l'élaboration d'une Under IDA / D2730 technical support for the GTA Post Qualification Limited 0.00 2020-12-15 2020-12-22 2020-12-29 2021-01-28 2021-03-04 2021-08-31 feuille de route pour la mise Implementation negotiations Selection en place d'une industrie de l'hydrogène MR-MR-PADG-207921-CS- CQS / Recrutement d'un Consultant Firme pour Strengthening of the Consultant Under développer un logiciel de IDA / D2730 institutional and regulatory Post Qualification Open - National 0.00 2020-12-21 2021-04-26 2021-01-11 2021-05-27 2021-02-24 2021-03-26 2021-04-30 2021-10-27 Implementation gestion de la scolarité pour framework Selection l'Ecole Supérieure Polytechnique de Nouakchott MR-MR-PADG-209135-CS- Capacity building and Consultant CQS / Plan de dé- Under IDA / D2730 technical support for the GTA Post Qualification Limited 0.00 2020-12-14 2020-12-28 2020-12-28 2021-01-27 2021-03-03 2021-08-30 carbonisation de la Implementation negotiations Selection production pétrolière MR-MR-PADG-228277-CS- CQS / Recrutement d’un Capacity building and Consultant cabinet pour Pending IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 2021-07-05 2021-07-26 2021-09-08 2021-10-08 2021-11-12 2022-05-11 l’accompagnement de la SMH Implementation negotiations Selection dans son processus de certification MR-MR-PADG-228279-CS- Capacity building and Consultant CQS / Recrutement d'un Pending IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 2021-07-05 2021-07-26 2021-09-08 2021-10-08 2021-11-12 2022-05-11 organisme certificateur pour Implementation negotiations Selection la SMH MR-MR-PADG-228280-CS- CQS / Recrutement d’un Capacity building and Consultant Consultant pour l'élaboration Under IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 2021-05-20 2021-05-19 2021-06-10 2021-06-04 2021-07-24 2021-08-23 2021-09-27 2022-03-26 d’un système de conduite des Implementation negotiations Selection activités des projets pétroliers et gaziers MR-MR-PADG-228282-CS- CQS / Recrutement d’un cabinet pour Capacity building and Consultant Pending l’accompagnement à la SMH IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 2021-07-05 2021-07-26 2021-09-08 2021-10-08 2021-11-12 2022-05-11 Implementation dans la maitrise d’œuvre et negotiations Selection maitrise d’ouvrage pour la mise en place d’un ERP MR-MR-PADG-228440-CS- CQS / RECRUTEMENT D’UN CABINET D’AUDIT SPECIALISE Capacity building and Consultant POUR L’ELABORATION D’UN Under IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 2021-05-26 2021-05-19 2021-06-16 2021-06-04 2021-07-30 2021-08-29 2021-10-03 2022-04-01 GUIDE D’AUDIT DES COÛTS Implementation negotiations Selection PETROLIERS ET UN RÉFÉRENTIEL OPÉRATOIRE DES ACTIVITÉS PÉTROLIÈRE MR-MR-PADG-207420-CS- CQS / Recrutement d'un Capacity building and Consultant Consultant firme pour la IDA / D2730 technical support for the GTA Post Qualification Limited 0.00 Canceled 2020-12-15 2020-12-29 2021-01-28 2021-03-04 2021-08-31 réalisation d'un diagnostic negotiations Selection institutionnel et organisationnel du MPME MR-MR-PADG-205394-CS- CQS / Recrutement d'un Consultant pour l'élaboration Capacity building and Consultant Under d'un Manuel de procédures IDA / D2730 technical support for the GTA Post Qualification Open - National 0.00 2021-05-19 2021-05-19 2021-06-09 2021-06-07 2021-07-23 2021-08-22 2021-09-26 2022-03-25 Implementation administratives et financières negotiations Selection du Ministère du Pétrole, des Mines et de l'Energie Page 5 MR-MR-PADG-205347-CS- QCBS / Recrutement d'un cabinet pour réaliser l'audit Capacity building and des coûts passés de GTA, Quality And Cost- IDA / D2730 technical support for the GTA Post Open - International 0.00 Canceled 2021-01-11 2021-02-01 2021-03-17 2021-04-14 2021-05-14 2021-06-18 2021-07-23 2022-07-23 l'élaboration d'un référentiel Based Selection negotiations d'audit des coûts pétroliers et d'un référentiel opératoire pour le MPME MR-MR-PADG-204824-CS- QCBS / Recrutement d'un Strengthening of the Cabinet de Conseil Quality And Cost- IDA / D2730 institutional and regulatory Post Open - International 0.00 Canceled 2021-01-05 2021-01-26 2021-03-11 2021-04-08 2021-05-08 2021-06-12 2021-07-17 2022-07-17 stratégique pour la mise en Based Selection framework place d’une zone de services dédiée aux hydrocarbures MR-MR-PADG-135961-CS- CQS / Recrutement d’un Capacity building and Consultant Consultant (firme) pour la IDA / D2730 technical support for the GTA Post Qualification Open - National 0.00 Canceled 2019-09-30 2020-02-24 2019-10-21 2020-03-18 2019-12-04 2020-01-03 2020-02-07 2020-08-05 réalisation et la mise en place negotiations Selection d’un Système de ménagement environnemental (SME) du GTA MR-MR-PADG-233736-CS- CQS / Recrutement d'une firme d'assistance en Capacity building and Consultant Pending Environnement, y compris IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 2021-06-15 2021-07-06 2021-08-19 2021-09-18 2021-10-23 2022-04-21 Implementation pour la réalisation d'un negotiations Selection Système de Management Environnemental MR-MR-PADG-233738-CS- CQS / Recrutement d'un Capacity building and Consultant Cabinet de Conseil IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 Under Review 2021-05-26 2021-06-09 2021-06-16 2021-07-30 2021-08-29 2021-10-03 2022-04-01 stratégique pour la mise en negotiations Selection place d’une zone de services dédiée aux hydrocarbures MR-MR-PADG-204825-CS- QCBS / Recrutement d'un Strengthening of the cabinet de Conseil stratégique Quality And Cost- IDA / D2730 institutional and regulatory Post Open - International 0.00 Canceled 2020-11-30 2020-12-15 2020-12-21 2021-02-03 2021-03-03 2021-04-02 2021-05-07 2021-06-11 2022-06-11 pour le schéma de réalisation Based Selection framework et d’exploitation d'un gazoduc du Projet GTA MR-MR-PADG-236300-CS- CQS / Recrutement d'un Capacity building and Consultant cabinet de Conseil stratégique Under IDA / D2730 technical support for the GTA Post Qualification Open - International 0.00 2021-06-15 2021-07-06 2021-08-19 2021-09-18 2021-10-23 2022-04-21 pour le schéma de réalisation Implementation negotiations Selection et d’exploitation d'un gazoduc du Projet GTA INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MR-PADG-54475-CS- Project management and CDS / Recrutement de IDA / D2730 Prior Direct Selection Direct 48,133.93 Signed 2018-06-07 2018-06-12 2018-06-17 2018-08-21 2018-10-22 2019-02-17 coordination Coordinateur pour le projet MR-MR-PADG-54524-CS- INDV / Recrutement d'un Capacity building and Individual spécialiste en développent du IDA / D2730 technical support for the GTA Post Consultant Open 200,000.00 Signed 2019-01-01 2019-02-13 2019-02-19 2019-08-01 2019-03-12 2019-11-04 2019-04-16 2019-11-04 2019-10-13 projet de gaz et de GNL pour negotiations Selection le MEPM MR-MR-PADG-81477-CS- CDS / RECRUTEMENT D'UN CABINET DE CONSEIL Capacity building and SPECILAISE POURLA REVUE DU IDA / D2730 technical support for the GTA Prior Direct Selection Direct 728,939.39 Completed 2018-11-14 2019-02-07 2018-11-24 2018-11-14 2019-01-28 2019-02-05 2019-07-27 2020-07-08 PLAN DE DEVELOPENT DE LA negotiations PHASE 1 DE GTA ET L'ANALYSE DES MODELES Y ASSOCIES MR-MR-PADG-106759-CS- Individual Project management and INDV / Responsable du suivi IDA / D2730 Post Consultant Limited 24,679.67 Signed 2019-04-09 2019-04-26 2019-04-14 2019-08-14 2019-05-05 2019-08-16 2019-06-09 2019-08-28 2019-12-06 coordination des bénéficiaires Selection MR-MR-PADG-106761-CS- INDV / Responsable de la Individual Project management and Cellule chargée du diagnostic IDA / D2730 Post Consultant Limited 24,679.67 Signed 2019-04-09 2019-04-26 2019-04-14 2019-08-28 2019-05-05 2019-08-30 2019-06-09 2019-09-13 2019-12-06 coordination institutionnel et du Selection renforcement des capacités MR-MR-PADG-68042-CS- Individual Project management and INDV / Recrutement d'un IDA / D2730 Post Consultant Limited 16,901.41 Signed 2019-04-09 2019-04-10 2019-04-14 2020-04-24 2019-05-05 2020-05-18 2019-06-09 2020-06-16 2019-12-06 coordination Comptable Selection MR-MR-PADG-88230-CS- Individual INDV / Recrutement d'un Project management and IDA / D2730 Post Consultant Direct 25,600.00 Signed 2019-04-09 2019-05-17 2019-04-19 2019-05-20 2019-05-09 2019-11-01 2019-06-13 2019-11-01 2019-12-10 Responsable de Passation de coordination Selection marchés MR-MR-PADG-54557-CS- Individual Project management and INDV / Recrutement d'un IDA / D2730 Post Consultant Limited 0.00 Canceled 2019-04-09 2020-04-21 2019-04-14 2019-05-05 2019-06-09 2019-12-06 coordination auditeur interne Selection MR-MR-PADG-54541-CS- Individual INDV / Recrutement d'un Project management and IDA / D2730 Post Consultant Open 0.00 Canceled 2019-04-09 2019-04-04 2019-05-28 2020-02-04 2019-06-18 2019-07-23 2020-01-19 spécialiste en suivi et coordination Selection évaluation MR-MR-PADG-108223-CS- Individual Project management and INDV / Responsable Cellule IDA / D2730 Post Consultant Limited 0.00 Canceled 2019-04-09 2019-04-14 2019-05-05 2019-06-09 2019-12-06 coordination "Soutien aux négociations" Selection Page 6 MR-MR-PADG-54523-CS- QCBS / Recrutement d'un Capacity building and Individual conseiller juridique ad hoc IDA / D2730 technical support for the GTA Post Consultant Open 197,227.15 Signed 2019-04-08 2019-03-21 2019-05-27 2019-07-09 2019-06-17 2019-12-16 2019-07-22 2020-04-03 2020-01-18 pour le MPEM spécialisé dans negotiations Selection le développement des hydrocarbures MR-MR-PADG-108272-CS- INDV / Recrutement d'un Consultant individuel pour la rédaction d'un accord Strengthening of the Individual d'association (Joint Operating IDA / D2730 institutional and regulatory Post Consultant Open 200,000.00 Signed 2019-04-11 2019-05-22 2019-05-30 2019-08-27 2019-06-20 2020-02-12 2019-07-25 2020-03-02 2020-01-21 Agreement) type pour la framework Selection Société Mauritanienne des Hydrocarbures et de Patrimoine Minier MR-MR-PADG-108274-CS- INDV / Recrutement d'un Capacity building and Individual Consultant individuel IDA / D2730 technical support for the GTA Post Consultant Open 200,000.00 Signed 2019-04-02 2019-03-21 2019-05-21 2019-06-24 2019-06-11 2019-09-18 2019-07-16 2019-09-18 2020-01-12 spécialisé en Economie et en negotiations Selection fiscalité du secteur des hydrocarbures MR-MR-PADG-141995-CS- Project management and CDS / Recrutement d'un IDA / D2730 Prior Direct Selection Direct 48,452.22 Signed 2019-10-22 2019-10-28 2019-11-01 2018-06-11 2020-01-05 2018-10-22 2020-07-03 coordination Coordonnateur pour le Projet MR-MR-PADG-151241-CS- Individual INDV / Recrutement d'un Project management and IDA / D2730 Post Consultant Limited 15,957.44 Signed 2019-12-24 2019-12-19 2019-12-29 2020-01-21 2020-01-19 2020-02-06 2020-02-23 2020-02-06 2020-08-21 Analyste d'opérations pour le coordination Selection Projet MR-MR-PADG-153822-CS- INDV / Recrutement d'un consultant pour l'élaboration Capacity building and Individual d'un cahier de charges pour la IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-02-15 2020-03-21 2020-09-17 mise en place d'une plate negotiations Selection forme informatique pour la modélisation réservoirs MR-MR-PADG-153899-CS- INDV / Recrutement d'un Consultant individuel pour la conception et la mise en place Capacity building and Individual en place d'une plate-forme IDA / D2730 technical support for the GTA Post Consultant Open 27,592.90 Signed 2020-01-20 2020-03-15 2020-03-09 2020-04-29 2020-03-30 2020-05-12 2020-05-04 2020-06-10 2020-10-31 d'évaluation des formateurs negotiations Selection du département de la formation technique et professionnelle MR-MR-PADG-153904-CS- INDV / Recrutement d'un Consultant individuel Capacity building and Individual Spécialisé dans le secteur des IDA / D2730 technical support for the GTA Post Consultant Open 51,090.90 Signed 2020-01-20 2020-02-08 2020-03-09 2020-04-11 2020-03-30 2020-06-24 2020-05-04 2020-09-13 2020-10-31 services pour le Département negotiations Selection de la Formation technique et professionnelle MR-MR-PADG-153908-CS- INDV / Recrutement d'un Consultants individuel Capacity building and Individual Spécialisé dans le secteur des IDA / D2730 technical support for the GTA Post Consultant Open 72,927.00 Signed 2020-01-20 2020-02-08 2020-03-09 2020-07-20 2020-03-30 2020-09-07 2020-05-04 2020-10-05 2020-10-31 travaux publics pour le negotiations Selection Département de la Formation technique et professionnelle MR-MR-PADG-154447-CS- INDV / Recrutement d'un Consultant individuel Capacity building and Individual Spécialisé dans le secteur de IDA / D2730 technical support for the GTA Post Consultant Open 56,883.06 Signed 2020-01-20 2020-02-08 2020-03-09 2020-08-19 2020-03-30 2020-09-03 2020-05-04 2020-10-02 2020-10-31 l'industrie pour le negotiations Selection Département de la Formation technique et professionnelle 1 MR-MR-PADG-154451-CS- Capacity building and Individual INDV / Recrutement d’un IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-02-15 2020-03-21 2020-09-17 expert juriste spécialisé dans negotiations Selection le domaine des hydrocarbures MR-MR-PADG-154452-CS- Capacity building and Individual INDV / Recrutement d’un chef IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-02-15 2020-03-21 2020-09-17 de projet Senior negotiations Selection MR-MR-PADG-154453-CS- Capacity building and Individual INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-02-15 2020-03-21 2020-09-17 Ingénieur pétrolier 1 negotiations Selection MR-MR-PADG-154454-CS- Capacity building and Individual INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-02-15 2020-03-21 2020-09-17 Ingénieur pétrolier 2 negotiations Selection MR-MR-PADG-154455-CS- Capacity building and Individual INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-02-15 2020-03-21 2020-09-17 Ingénieur pétrolier 3 negotiations Selection MR-MR-PADG-154456-CS- INDV / Recrutement d'un Consultant pour l'élaboration Capacity building and Individual d'un CdC pour la mise en IDA / D2730 technical support for the GTA Post Consultant Limited 39,875.00 Signed 2020-01-20 2020-01-26 2020-01-25 2020-05-16 2020-02-15 2020-09-01 2020-03-21 2020-09-15 2020-09-17 place d'une PF informatique negotiations Selection pour la modélisation réservoir pour la SMHPM MR-MR-PADG-154458-CS- INDV / Recrutement d'un Capacity building and Individual Expert économiste spécialisé IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-02-15 2020-03-21 2020-09-17 dans le domaine des negotiations Selection hydrocarbures 1 MR-MR-PADG-154459-CS- INDV / Recrutement d'un Capacity building and Individual Expert économiste spécialisé IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-02-15 2020-03-21 2020-09-17 dans le domaine des negotiations Selection hydrocarbures 2 Page 7 MR-MR-PADG-154460-CS- INDV / Recrutement d’un Capacity building and Individual Expert spécialisé dans le IDA / D2730 technical support for the GTA Post Consultant Open 0.00 Canceled 2020-01-20 2020-03-09 2020-03-30 2020-05-04 2020-10-31 développement des projets negotiations Selection pétroliers MR-MR-PADG-155603-CS- Individual Project management and INDV / Recrutement d'un RAF IDA / D2730 Post Consultant Limited 26,912.92 Signed 2020-02-02 2020-02-23 2020-02-07 2020-03-13 2020-02-28 2020-03-13 2020-04-03 2020-03-27 2020-09-30 coordination pour le Projet Selection MR-MR-PADG-163607-CS- INDV / Recrutement d’un Capacity building and Individual consultant individuel IDA / D2730 technical support for the GTA Post Consultant Open 52,726.77 Signed 2020-03-09 2020-06-09 2020-04-27 2020-12-07 2020-05-18 2021-01-11 2020-06-22 2021-02-11 2020-12-19 spécialisé dans le domaine de negotiations Selection certification MR-MR-PADG-163617-CS- INDV / Recrutement d’un Capacity building and Individual consultant individuel IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-03-09 2020-03-14 2020-04-04 2020-05-09 2020-11-05 spécialisé en communication negotiations Selection pour le Ministère du Pétrole, des Mines et de l’Énergie MR-MR-PADG-163604-CS- CQS / Recrutement d’un cabinet spécialisé pour une Project management and IDA / D2730 Post Direct Selection Direct 41,354.43 Completed 2020-03-09 2020-03-05 2020-03-19 2020-03-10 2020-05-23 2020-03-26 2020-11-19 2020-10-27 assistance en passation des coordination marchés et en gestion de contrat MR-MR-PADG-54545-CS- Individual Project management and INDV / Recrutement d'un IDA / D2730 Prior Consultant Open 0.00 Canceled 2018-06-04 2018-07-23 2018-08-13 2018-09-17 2019-03-16 coordination Expert Copmtable Selection MR-MR-PADG-54548-CS- Individual INDV / Recrutement d'un Project management and IDA / D2730 Post Consultant Direct 0.00 Canceled 2019-04-09 2019-04-19 2019-05-10 2019-06-14 2019-12-11 Responsable Administratif et coordination Selection Financier MR-MR-PADG-108895-CS- Individual INDV / Recrutement d'un Project management and IDA / D2730 Prior Consultant Direct 0.00 Canceled 2019-04-04 2020-04-10 2019-04-14 2019-05-05 2019-06-09 2019-12-06 Responsable Administratif et coordination Selection Financier MR-MR-PADG-168274-CS- INDV / Recrutement d’un Consultant individuel pour la Capacity building and Individual création d’une plateforme IDA / D2730 technical support for the GTA Post Consultant Open 39,875.00 Signed 2020-04-20 2020-04-17 2020-06-08 2020-07-06 2020-06-29 2020-09-01 2020-08-03 2020-09-15 2021-01-30 sécurisée pour la réception et negotiations Selection l’ouverture en ligne des offres et des propositions MR-MR-PADG-169011-CS- Project management and CDS / Recrutement d'un IDA / D2730 Post Direct Selection Direct 3,836.53 Signed 2020-04-20 2020-03-22 2020-04-30 2020-04-20 2020-07-04 2020-04-24 2020-12-31 coordination chauffeur pour le projet MR-MR-PADG-169013-CS- Individual Project management and INDV / recrutement d'un IDA / D2730 Post Consultant Direct 3,836.53 Signed 2020-04-20 2020-03-22 2020-04-30 2020-04-20 2020-05-21 2020-05-04 2020-06-25 2020-05-04 2020-12-22 coordination coursier Selection MR-MR-PADG-169014-CS- Individual Project management and INDV / Recrutement d'un IDA / D2730 Post Consultant Direct 5,504.59 Signed 2020-04-20 2020-03-22 2020-04-30 2020-04-20 2020-05-21 2020-04-21 2020-06-25 2020-04-30 2020-12-22 coordination agent d'accueil et logistique Selection MR-MR-PADG-169016-CS- Individual Project management and INDV / Recrutement d'un(e) IDA / D2730 Post Consultant Limited 8,365.15 Signed 2020-04-20 2020-03-22 2020-04-25 2020-09-09 2020-05-16 2020-09-09 2020-06-20 2020-09-14 2020-12-17 coordination secrétaire Selection MR-MR-PADG-171703-CS- INDV / Recrutement d'un Strengthening of the Individual Consultant individuel pour IDA / D2730 institutional and regulatory Post Consultant Limited 3,276.71 Signed 2020-05-05 2020-06-16 2020-05-10 2020-12-11 2020-05-31 2021-01-06 2020-07-05 2021-02-17 2021-01-01 réaliser un diagnostic de l'état framework Selection du câblage du Ministère du pétrole, MR-MR-PADG-135097-CS- Individual Project management and INDV / Responsable de IDA / D2730 Post Consultant Limited 0.00 Canceled 2019-10-03 2019-10-08 2019-10-29 2019-12-03 2020-05-31 coordination gestion des contrats Selection MR-MR-PADG-177901-CS- Individual Project management and INDV / Responsable de IDA / D2730 Post Consultant Open 27,363.74 Signed 2020-06-15 2019-07-31 2020-08-03 2020-11-20 2020-08-24 2021-04-20 2020-09-28 2021-05-18 2021-03-27 coordination gestion des contrats Selection MR-MR-PADG-153524-CS- INDV / Recrutement d’un Capacity building and Individual conseiller financier pour le IDA / D2730 technical support for the GTA Post Consultant Open 0.00 Canceled 2020-02-17 2020-04-06 2020-04-27 2020-06-01 2020-11-28 financement des projets GTA negotiations Selection et BirAllah MR-MR-PADG-153529-CS- Capacity building and Individual INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Open 0.00 Canceled 2020-01-20 2020-03-09 2020-03-30 2020-05-04 2020-10-31 Consultant pour valoriser les negotiations Selection anciennes découvertes MR-MR-PADG-184275-CS- INDV / Recrutement d'un expert pour une assistance dans la mise en œuvre de Capacity building and Individual stratégies de socio- IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-07-22 2020-08-11 2020-07-27 2020-08-17 2020-09-21 2021-03-20 économiques, et dans la negotiations Selection mobilisation des parties prenantes dans le secteur extractif MR-MR-PADG-192270-CS- Individual INDV / Recrutement d'un Project management and IDA / D2730 Post Consultant Open 26,958.90 Signed 2020-09-14 2020-09-14 2020-11-02 2021-03-24 2020-11-23 2021-04-21 2020-12-28 2021-05-26 2021-06-26 Responsable de Suivi et coordination Selection Évaluation MR-MR-PADG-196099-CS- Individual Project management and INDV / Recrutement d'un IDA / D2730 Post Consultant Open 26,651.86 Signed 2020-09-26 2020-10-30 2020-11-14 2021-01-22 2020-12-05 2021-01-25 2021-01-09 2021-04-30 2021-07-08 coordination auditeur interne du Projet Selection Page 8 MR-MR-PADG-197709-CS- INDV / Consultant pour Strengthening of the Individual l'élaboration d’un cahier de IDA / D2730 institutional and regulatory Post Consultant Open 40,000.00 Signed 2020-10-12 2020-10-07 2020-11-30 2020-12-09 2020-12-21 2021-01-11 2021-01-25 2021-02-11 2021-07-24 charges pour la mise en place framework Selection d'un centre documentaire MR-MR-PADG-172823-CS- CDS / Recrutement d’un Consultant pour le Strengthening of the développement d’une offre de IDA / D2730 institutional and regulatory Post Direct Selection Direct 0.00 Canceled 2020-05-26 2020-08-13 2020-06-05 2020-08-09 2021-02-05 formation à distance pour le framework secteur de la formation technique et professionnelle MR-MR-PADG-182324-CS- CDS / Convention avec l'INAP- Capacity building and FTP pour la formation de 300 IDA / D2730 technical support for the GTA Post Direct Selection Direct 0.00 Canceled 2020-07-13 2020-08-13 2020-07-23 2020-09-26 2021-03-25 techniciens dans les domaines negotiations liés à l'exploitation du gaz naturel MR-MR-PADG-197704-CS- CDS / Recrutement d'un Capacity building and cabinet d'assistance en IDA / D2730 technical support for the GTA Post Direct Selection Direct 41,354.43 Signed 2020-10-08 2020-10-15 2020-10-18 2020-10-22 2020-12-22 2020-10-26 2021-06-20 passation et exécution des negotiations marchés MR-MR-PADG-199166-CS- Capacity building and Individual Under INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2020-12-10 2020-12-28 2021-01-28 2021-02-18 2021-03-25 2021-09-21 Implementation Ingénieur pétrolier 1 negotiations Selection MR-MR-PADG-199171-CS- Capacity building and Individual INDV / Recrutement d'un Under IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2020-12-17 2020-12-29 2021-02-04 2021-02-25 2021-04-01 2021-09-28 Expert en économie des Implementation negotiations Selection hydrocarbures MR-MR-PADG-199176-CS- INDV / Recrutement d'un Capacity building and Individual Expert en communication Under IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-01-21 2021-03-10 2021-03-11 2021-04-01 2021-05-06 2021-11-02 spécialisé dans le Implementation negotiations Selection développement du contenu web MR-MR-PADG-199177-CS- INDV / Recrutement d'un Capacity building and Individual Under Expert en communication IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2020-12-14 2021-03-24 2021-02-01 2021-02-22 2021-03-29 2021-09-25 Implementation spécialisé dans les médias negotiations Selection sociaux MR-MR-PADG-199180-CS- CDS / Plan de formation pour Capacity building and Under 300 techniciens dans le s IDA / D2730 technical support for the GTA Post Direct Selection Direct 0.00 2020-11-02 2020-11-12 2021-01-16 2021-07-15 Implementation métiers liés au negotiations développement du gaz MR-MR-PADG-199174-CS- Capacity building and Individual INDV / Recrutement d'un Under IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2020-12-29 2021-02-02 2021-02-16 2021-03-09 2021-04-13 2021-10-10 Juriste spécialisé dans le Implementation negotiations Selection domaine des hydrocarbures MR-MR-PADG-205365-CS- Capacity building and Individual Under INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2020-12-15 2020-12-28 2021-02-02 2021-04-30 2021-02-23 2021-05-11 2021-03-30 2021-09-26 Implementation Expert pétrolier Senior negotiations Selection MR-MR-PADG-205369-CS- Capacity building and Individual INDV / Recrutement d’un IDA / D2730 technical support for the GTA Post Consultant Open 150,000.00 Signed 2021-01-05 2020-12-12 2021-02-23 2021-03-15 2021-03-16 2021-03-25 2021-04-20 2021-04-27 2021-10-17 Expert en Géosciences negotiations Selection MR-MR-PADG-169018-CS- Capacity building and Individual INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-04-20 2020-04-25 2020-05-16 2020-06-20 2020-12-17 traducteur arabe-français negotiations Selection MR-MR-PADG-205391-CS- Capacity building and Individual Under INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-01-05 2021-03-29 2021-02-23 2021-03-16 2021-04-20 2021-10-17 Implementation Traducteur pour le MPME negotiations Selection MR-MR-PADG-207415-CS- Capacity building and CDS / Plan de dé- IDA / D2730 technical support for the GTA Post Direct Selection Direct 0.00 Canceled 2020-12-08 2020-12-18 2021-02-21 2021-08-20 carbonisation de la negotiations production pétrolière MR-MR-PADG-199164-CS- INDV / Recrutement d'un Capacity building and Individual Directeur d'un centre de IDA / D2730 technical support for the GTA Post Consultant Open 84,315.36 Signed 2020-12-03 2020-12-22 2021-01-21 2021-03-11 2021-02-11 2021-04-20 2021-03-18 2021-05-18 2021-09-14 formation à distance pour le negotiations Selection Ministère du Pétrole, des Mines et de l'Energie MR-MR-PADG-153818-CS- INDV / Consultant pour Capacity building and Individual l'élaboration d’un cahier de IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 Canceled 2020-01-20 2020-01-25 2020-01-25 2020-02-15 2020-03-21 2020-09-17 charges pour la mise en place negotiations Selection d'un centre documentaire MR-MR-PADG-202523-CS- INDV / Recrutement d'un Capacity building and Individual Consultant individuel pour IDA / D2730 technical support for the GTA Post Consultant Open 0.00 Canceled 2020-11-10 2020-12-29 2021-01-19 2021-02-23 2021-08-22 réaliser un diagnostic de l'état negotiations Selection du câblage du Ministère du pétrole MR-MR-PADG-163600-CS- INDV / Recrutement d’un Capacity building and Individual Consultant spécialisé en IDA / D2730 technical support for the GTA Post Consultant Open 0.00 Canceled 2020-03-16 2020-03-15 2020-05-04 2020-05-25 2020-06-29 2020-12-26 stratégie de développement negotiations Selection du secteur des Hydrocarbures Page 9 MR-MR-PADG-228283-CS- INDV / Recrutement d’un Expert métier pour Capacity building and Individual l'accompagnement des Pending IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-06-15 2021-08-03 2021-08-24 2021-09-28 2022-03-27 ingénieurs de la SMH à Implementation negotiations Selection l'appropriation des outils de modélisation: aspects liés à la Géologie MR-MR-PADG-228285-CS- INDV / Recrutement d’un Expert métier pour Capacity building and Individual l'accompagnement des Pending IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-06-15 2021-08-03 2021-08-24 2021-09-28 2022-03-27 ingénieurs de la SMH à Implementation negotiations Selection l'appropriation des outils de modélisation: aspects liés à la Géophysique MR-MR-PADG-228286-CS- INDV / Recrutement d’un Expert métier pour Capacity building and Individual l'accompagnement des Pending IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-06-15 2021-08-03 2021-08-24 2021-09-28 2022-03-27 ingénieurs de la SMH à Implementation negotiations Selection l'appropriation des outils de modélisation: aspects liés au Réservoir Engineering MR-MR-PADG-88772-CS- INDV / Recrutement d'un Individual Expert Technique spécialisé Project management and IDA / D2730 Post Consultant Limited 0.00 Canceled 2019-01-26 2019-04-26 2019-01-31 2019-02-21 2019-03-28 2019-09-24 dans le domaine des coordination Selection développements pétroliers/gaziers MR-MR-PADG-233534-CS- Capacity building and Individual Pending INDV / Recrutement d'un (e) IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2022-02-11 Implementation Assistant (e) de direction negotiations Selection MR-MR-PADG-228419-CS- INDV / Recrutement d'un Capacity building and Individual consultant pour réaliser des Under IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-05-19 2021-06-09 2021-07-07 2021-07-28 2021-09-01 2022-02-28 formations en passation des Implementation negotiations Selection marchés pour les équipes du MPME MR-MR-PADG-54552-CS- Individual INDV / Recrutement d'un Project management and IDA / D2730 Post Consultant Limited 0.00 Canceled 2019-01-26 2019-01-31 2019-02-21 2019-03-28 2019-09-24 assistant Administratif et coordination Selection financier MR-MR-PADG-199179-CS- Capacity building and Individual INDV / Recrutement d'un chef IDA / D2730 technical support for the GTA Post Consultant Open 0.00 Canceled 2020-10-26 2020-12-14 2021-01-04 2021-02-08 2021-08-07 de Projet negotiations Selection MR-MR-PADG-108226-CS- Individual INDV / Responsable Cellule" Project management and IDA / D2730 Post Consultant Limited 0.00 Canceled 2019-04-09 2019-04-26 2019-04-14 2019-05-05 2019-06-09 2019-12-06 Cadre stratégique et politique coordination Selection et parties prenantes" MR-MR-PADG-154448-CS- INDV / Recrutement d'un Consultant individuel Capacity building and Individual Spécialisé dans le secteur de IDA / D2730 technical support for the GTA Post Consultant Open 0.00 Canceled 2020-01-20 2020-02-08 2020-03-09 2020-03-30 2020-05-04 2020-10-31 l'industrie pour le negotiations Selection Département de la Formation technique et professionnelle 2 MR-MR-PADG-228731-CS- CDS / Recrutement d’un cabinet spécialisé pour Project management and IDA / D2730 Post Direct Selection Direct 4,193.63 Signed 2021-05-12 2021-05-20 2021-05-22 2021-05-20 2021-07-26 2021-05-27 2022-01-22 assistance en passation des coordination marchés et en suivi de l’exécution des marchés MR-MR-PADG-206574-CS- INDV / Recrutement d’un Expert technique pour l’appui en suivi à la mise en œuvre Strengthening of the Individual Under des opérations IDA / D2730 institutional and regulatory Post Consultant Open 0.00 2021-05-26 2021-07-14 2021-08-04 2021-09-08 2022-03-07 Implementation administratives et financières framework Selection auprès du Ministère du Pétrole, des Mines et de l’Energie MR-MR-PADG-199167-CS- Capacity building and Individual Under INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-06-15 2021-06-01 2021-08-03 2021-08-24 2021-09-28 2022-03-27 Implementation Ingénieur pétrolier 2 negotiations Selection MR-MR-PADG-207180-CS- Individual Project management and Pending INDV / Recrutement d'un IDA / D2730 Post Consultant Limited 0.00 2021-09-20 2021-09-25 2021-10-16 2021-11-20 2022-05-19 coordination Implementation chargé de programme de Selection l'UGP MR-MR-PADG-206144-CS- INDV / Recrutement d'un Consultant individuel pour le Strengthening of the Individual développement d'une Under IDA / D2730 institutional and regulatory Post Consultant Open 0.00 2021-05-24 2021-05-19 2021-07-12 2021-08-02 2021-09-06 2022-03-05 plateforme informatique pour Implementation framework Selection une offre de formation à distance de l'Enseignement technique et professionnel MR-MR-PADG-199169-CS- Capacity building and Individual Under INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-07-30 2021-09-17 2021-10-08 2021-11-12 2022-05-11 Implementation Ingénieur pétrolier3 negotiations Selection MR-MR-PADG-199178-CS- Capacity building and Individual Under INDV / Recrutement d'un IDA / D2730 technical support for the GTA Post Consultant Open 0.00 2021-05-24 2021-05-19 2021-07-12 2021-08-02 2021-09-06 2022-03-05 Implementation expert en organisation negotiations Selection MR-MR-PADG-233734-CS- Capacity building and Individual INDV / Recrutement d'un Pending IDA / D2730 technical support for the GTA Post Consultant Limited 0.00 2021-06-15 2021-06-20 2021-07-11 2021-08-15 2022-02-11 expert pour la Cellule Implementation negotiations Selection Hydrogène au sein du MPME Page 10 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: December, 2016 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: Jan 2017 to June 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 5 High risk installation of plant and equipment and PPP) 2. (Goods; Information Technology & 1.5 High risk Non-Consulting Services) 3. Consultant Services (Firms) 0.5 High risk 4. Consultant Services (Individual 0.2 High risk Consultants) 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements: NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. January 11, 2018 9. Renewal or extension of individual consultant’s contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. January 11, 2018 PROCUREMENT Kenya : Kenya Climate Smart Agriculture Project PLAN General Information Country: Kenya Bank’s Approval Date of the Original Procurement Plan: 2019-10-01 2021-05-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154784 GPN Date: 2018-02-08 Project Name: Kenya Climate Smart Agriculture Project Loan / Credit No: IDA / 59450 S Executing Agency(ies): iaya County WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 4: Project KE-SIAYA COUNTY-148235- Coordination and Request for Single Stage - One 2019-07- CW-RFQ / Renovation of IDA / 59450 Management (US$29.3 Post Limited 24,272.00 24,380.57 Completed 2019-05-02 2019-05-02 2019-06-04 2019-06-19 Quotations Envelope 31 Office million equivalent, of which IDA US$20.0 million equivalent) Component 1: Upscaling KE-SIAYA COUNTY-153256- Climate-Smart Agricultural Request for Single Stage - One 2019-11- CW-RFQ / Rehabilitation of IDA / 59450 Practices (US$163.8 million Post Limited 86,981.00 80,691.66 Completed 2019-03-13 2019-03-13 2019-05-08 2019-04-01 Quotations Envelope 04 Miruka Water Pan equivalent, of which IDA US$150.0 million eq uivalent) Component 1: Upscaling SYA/KCSAP/CPCU/RFQ/001/2 Climate-Smart Agricultural 019 - 2020 / Proposed Request for Single Stage - One 2020-10- IDA / 59450 Practices (US$163.8 million Post Limited 151,128.00 146,751.70 Signed 2020-04-24 2020-04-24 2020-06-08 2020-09-23 Rehabilitation of Kamola Quotations Envelope 06 equivalent, of which IDA Water Pan US$150.0 million eq uivalent) Component 1: Upscaling SYA/KCSAP/CPCU/RFQ/002/2 Climate-Smart Agricultural 019 - 2020 / Proposed Request for Single Stage - One 2020-10- IDA / 59450 Practices (US$163.8 million Post Limited 124,236.00 114,503.31 Signed 2020-04-24 2020-04-24 2020-06-08 2020-09-29 Rehabilitation of Ogenga Quotations Envelope 06 equivalent, of which IDA Water Pan US$150.0 million eq uivalent) Component 1: Upscaling SYA/KCSAP/CPCU/RFQ/004/2 Climate-Smart Agricultural 019-2020 / Proposed Request for Single Stage - One 2020-09- IDA / 59450 Practices (US$163.8 million Post Limited 156,390.00 0.00 Canceled 2020-04-24 2020-04-24 2020-06-08 Improvement Works at Quotations Envelope 06 equivalent, of which IDA Kamariga Omena Drying Plant US$150.0 million eq uivalent) Component 1: Upscaling KE-SIAYA COUNTY-201837- Climate-Smart Agricultural CW-RFQ / Proposed Single Stage - One 2021-04- IDA / 59450 Practices (US$163.8 million Post Request for Bids Limited 210,000.00 179,351.43 Signed 2020-11-20 2020-11-18 2020-11-27 2020-11-19 2020-12-11 2020-12-02 2020-12-16 2020-12-11 2020-12-21 2020-12-15 Construction of Kamariga Envelope 20 equivalent, of which IDA Omena Drying Project US$150.0 million eq uivalent) Component 1: Upscaling KE-SIAYA COUNTY-153253- Climate-Smart Agricultural Under Request for Single Stage - One 2019-11- CW-RFQ / Rehabilitation of IDA / 59450 Practices (US$163.8 million Post Limited 81,162.00 0.00 Implementat 2019-03-13 2019-05-08 Quotations Envelope 04 Adhiri Water Pan equivalent, of which IDA ion US$150.0 million eq uivalent) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Upscaling KE-SIAYA COUNTY-136482- Climate-Smart Agricultural Single Stage - One GO-RFB / procurement of IDA / 59450 Practices (US$163.8 million Post Request for Bids Open - National 500,000.00 0.00 Canceled 2019-10-21 2019-10-01 2019-10-26 2019-11-25 2019-10-01 2019-12-09 2019-10-01 2020-01-06 2020-02-05 Envelope Computers equivalent, of which IDA US$150.0 million eq uivalent) Component 1: Upscaling KE-SIAYA COUNTY-136636- Climate-Smart Agricultural Single Stage - One GO-RFB / Purchase of IDA / 59450 Practices (US$163.8 million Post Request for Bids Open - National 500,000.00 0.00 Canceled 2019-10-21 2019-10-26 2019-11-25 2019-12-09 2020-01-06 2020-02-05 Envelope Computers equivalent, of which IDA US$150.0 million eq uivalent) Component 4: Project KE-SIAYA COUNTY-142478- Coordination and Request for Single Stage - One GO-RFQ / Purchase of Office IDA / 59450 Management (US$29.3 Post Limited 24,272.00 23,466.97 Completed 2019-06-10 2019-06-10 2019-06-24 2019-06-21 2019-07-24 2019-07-24 Quotations Envelope Furniture million equivalent, of which IDA US$20.0 million equivalent) SYA/KCSAP/CPCU/RFQ/003/2 Component 1: Upscaling 019 - 2020 / Procurement for Climate-Smart Agricultural Single Stage - One Fish Drying Machine and IDA / 59450 Practices (US$163.8 million Post Request for Bids Limited 155,042.00 142,935.57 Signed 2020-04-13 2020-04-13 2020-04-24 2020-04-24 2020-05-24 2020-06-09 2020-06-03 2020-07-10 2020-06-08 2020-09-29 2020-10-06 Envelope Related Equipment for equivalent, of which IDA Kamariga Omena Drying Plant US$150.0 million eq uivalent) Component 1: Upscaling KE-SIAYA COUNTY-233546- Climate-Smart Agricultural Under GO-RFQ / Procurement for Request for Single Stage - One IDA / 59450 Practices (US$163.8 million Post Limited 40,500.00 0.00 Implementati 2021-05-20 2021-05-21 2021-06-11 2021-12-08 Motor Cycles to be used in the Quotations Envelope equivalent, of which IDA on field for farmer follow ups US$150.0 million eq uivalent) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Component 1: Upscaling KE-SIAYA COUNTY-137105- Climate-Smart Agricultural Quality And Cost- CS-QCBS / Provision of IDA / 59450 Practices (US$163.8 million Prior Open - National 25,800.00 0.00 Canceled 2019-10-01 2019-10-22 2019-10-29 2019-10-30 2019-11-24 2019-12-03 2019-12-05 2020-12-04 Based Selection farmer's training services equivalent, of which IDA US$150.0 million eq uivalent) Component 1: Upscaling KE-SIAYA COUNTY-143388- Climate-Smart Agricultural Quality And Cost- CS-QCBS / Contracted Service IDA / 59450 Practices (US$163.8 million Post Open - National 250,485.00 233,373.19 Signed 2019-04-19 2019-04-25 2019-05-09 2020-02-19 2019-05-31 2019-05-16 2019-06-25 2019-06-25 2019-07-30 2019-07-30 2019-08-27 2019-08-27 2019-12-02 2019-12-02 2020-12-01 Based Selection Providers equivalent, of which IDA US$150.0 million eq uivalent) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Central African Republic : Central African Republic Human Capital and Women and Girls' Empowerment (Maïngo) Project PLAN General Information Country: Central African Republic Bank’s Approval Date of the Original Procurement Plan: 2021-05-21 2021-05-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171158 GPN Date: Project Name: Central African Republic Human Capital and Women and Girls' Empowerment (Maïngo) Project Loan / Credit No: IDA / V3650 Ministry of Economy, Planning and Cooperation Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CF-MEPC-235801-CW-RFQ / Increase access to systems National Rénovation des CEFPA that improve health, Procurement Pending Request for Single Stage - One 2022-08- identifiés avec le soutien IDA / V3650 education and employment Post Limited Document - 1 60,000.00 0.00 Implementat 2022-01-05 2022-03-02 Quotations Envelope 29 d’une firme d’ingénierie opportunities of women and Envelope process ion spécialisée girls. (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-MEPC-234093-GO-RFQ / National capacity building, Acquisition de matériels et Pending communication campaigns to Request for Single Stage - One accessoires pour la mise en IDA / V3650 Post Limited 40,000.00 0.00 Implementati 2021-09-05 2021-10-31 2022-04-29 empower women and girls Quotations Envelope place du système de vidéo- on and project management conférence CF-MEPC-234101-GO-RFQ / National capacity building, Acquisition, installation et Pending communication campaigns to Request for Single Stage - One mise en service de système de IDA / V3650 Post Limited 30,000.00 0.00 Implementati 2021-11-03 2021-12-29 2022-06-27 empower women and girls Quotations Envelope communication internet par on and project management VSAT CF-MEPC-234098-GO-RFQ / National capacity building, Pending Mobiliers et accessoire de communication campaigns to Request for Single Stage - One IDA / V3650 Post Limited 40,000.00 0.00 Implementati 2021-09-05 2021-10-31 2022-04-29 bureau pour la Coordination empower women and girls Quotations Envelope on du projet and project management CF-MEPC-234099-GO-RFQ / National capacity building, Pending Matériels informatiques communication campaigns to Request for Single Stage - One IDA / V3650 Post Limited 50,000.00 0.00 Implementati 2021-10-05 2021-11-30 2022-05-29 (Ordinateurs, imprimantes, empower women and girls Quotations Envelope on serveur, tablettes etc.) and project management CF-MEPC-234100-GO-RFQ / National capacity building, Pending Acquisition de logiciel de communication campaigns to Request for Single Stage - One IDA / V3650 Post Limited 25,000.00 0.00 Implementati 2022-01-05 2022-03-02 2022-08-29 gestion financière et empower women and girls Quotations Envelope on comptable and project management National capacity building, CF-MEPC-235788-GO-RFQ / Pending communication campaigns to Single Stage - One Achat de deux véhicules pour IDA / V3650 Post Request for Bids Open - National 130,000.00 0.00 Implementati 2021-12-31 2022-01-05 2022-02-16 2022-03-18 2022-04-22 2022-10-19 empower women and girls Envelope la coordination du projet on and project management National capacity building, CF-MEPC-235790-GO-RFQ / Pending communication campaigns to Request for Single Stage - One Achat de dispositif de lutte IDA / V3650 Post Limited 5,000.00 0.00 Implementati 2021-11-03 2021-12-29 2022-06-27 empower women and girls Quotations Envelope contre le COVID 19 on and project management Increase access to systems CF-MEPC-235804-GO-RFQ / that improve health, Pending Request for Single Stage - One Achat d’équipements pour les IDA / V3650 education and employment Post Limited 60,000.00 0.00 Implementati 2022-05-23 2022-07-18 2023-01-14 Quotations Envelope six centres de formations opportunities of women and on girls. CF-MEPC-235795-GO-RFQ / Establishing Safe Spaces and Pending Request for Single Stage - One Achat d'équipements pour les IDA / V3650 Clubs to deliver integrated Post Limited 100,000.00 0.00 Implementati 2022-03-20 2022-05-15 2022-11-11 Quotations Envelope Espaces Surs et Clubs community-based programs. on CF-MEPC-235785-GO-RFQ / National capacity building, Panneaux solaires ou Pending communication campaigns to Request for Single Stage - One générateurs d'énergie et IDA / V3650 Post Limited 25,000.00 0.00 Implementati 2021-12-05 2022-01-30 2022-07-29 empower women and girls Quotations Envelope accessoires électriques pour on and project management la coordination du projet National capacity building, CF-MEPC-236364-GO-RFQ / Pending communication campaigns to Request for Single Stage - One Acquisition de matériels de IDA / V3650 Post Limited 10,000.00 0.00 Implementati 2022-01-05 2022-03-02 2022-08-29 empower women and girls Quotations Envelope climatisation on and project management NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-MEPC-234103-NC-RFQ / National capacity building, Pending Entretien et nettoyage des communication campaigns to Request for Single Stage - One IDA / V3650 Post Limited 15,000.00 0.00 Implementati 2021-10-05 2021-11-30 2022-05-29 bureaux de la Coordination du empower women and girls Quotations Envelope on Projet and project management National capacity building, CF-MEPC-234102-GO-RFQ / Pending communication campaigns to Request for Single Stage - One Location de bureau pour la IDA / V3650 Post Limited 100,000.00 0.00 Implementati 2021-11-03 2021-12-29 2022-06-27 empower women and girls Quotations Envelope Coordination du projet on and project management CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-MEPC-234397-CS-INDV / National capacity building, Consultant Recrutement des consultants communication campaigns to Pending IDA / V3650 Post Qualification Open - National 30,000.00 0.00 2022-01-31 2022-02-21 2022-04-06 2022-05-06 2022-06-10 2022-12-07 pour mener les études pour empower women and girls Implementation Selection composante 3 (court-terme) and project management CF-MEPC-234399-CS-INDV / National capacity building, Recrutement consultant pour Consultant communication campaigns to Pending développer les boites à outils IDA / V3650 Post Qualification Limited 10,000.00 0.00 2022-02-28 2022-03-14 2022-04-13 2022-05-18 2022-11-14 empower women and girls Implementation (des supports de Selection and project management communication imagés CF-MEPC-235799-CS-CQS / Recrutement d'un consultant Increase access to systems pour l'élaboration d'un that improve health, Consultant manuel pour les bourses et Pending IDA / V3650 education and employment Post Qualification Limited 30,000.00 0.00 2022-06-10 2022-06-24 2022-07-24 2022-08-28 2023-02-24 les COGEDES (élaboration des Implementation opportunities of women and Selection lignes directrices du PREAAFA girls. et du manuel des subventions scolaires CF-MEPC-234365-CS-QCBS Increase access to systems / Etudes ethnographiques à that improve health, Consultant Pending base communautaire dans les IDA / V3650 education and employment Post Qualification Limited 40,000.00 0.00 2021-12-01 2021-12-15 2022-01-14 2022-02-18 2022-08-17 Implementation zones du projet (composante opportunities of women and Selection n°1) girls. CF-MEPC-234367-CS-QCBS Increase access to systems / Etudes sur le ciblage sur les that improve health, Consultant Pending aspects liés à l'éducation pour IDA / V3650 education and employment Post Qualification Limited 30,000.00 0.00 2021-12-31 2022-01-14 2022-02-13 2022-03-20 2022-09-16 Implementation éclairer la mise en œuvre des opportunities of women and Selection programmes girls. Increase access to systems CF-MEPC-234361-CS-INDV / that improve health, Consultant Evaluation des systèmes de Pending IDA / V3650 education and employment Post Qualification Limited 40,000.00 0.00 2022-05-11 2022-05-25 2022-06-24 2022-07-29 2023-01-25 paiement existants dans les Implementation opportunities of women and Selection zones du projet girls. CF-MEPC-235811-CS-QCBS / Recrutement d'un cabinet National capacity building, pour coordonner et gérer la Consultant communication campaigns to Pending campagne de communication IDA / V3650 Post Qualification Limited 60,000.00 0.00 2022-08-26 2022-09-09 2022-10-09 2022-11-13 2023-05-12 empower women and girls Implementation nationale pour Selection and project management l'autonomisation des femmes et des filles CF-MEPC-235814-CS-QCBS National capacity building, / Contractualisation de Consultant communication campaigns to Pending partenaires d’exécution pour IDA / V3650 Post Qualification Limited 100,000.00 0.00 2022-12-31 2023-01-14 2023-02-13 2023-03-20 2023-09-16 empower women and girls Implementation l’appui à la mise en œuvre et Selection and project management la supervision. CF-MEPC-235819-CS-QCBS National capacity building, / Elaboration des documents Consultant communication campaigns to Pending de sauvegardes pour la IDA / V3650 Post Qualification Limited 40,000.00 0.00 2022-12-30 2023-01-13 2023-02-12 2023-03-19 2023-09-15 empower women and girls Implementation réhabilitation des six centres Selection and project management de formation professionnelle CF-MEPC-235800-CS-CQS / Increase access to systems Cabinet pour évaluer et that improve health, Consultant Pending élaborer le dossier technique IDA / V3650 education and employment Post Qualification Limited 30,000.00 0.00 2021-12-31 2022-01-14 2022-02-13 2022-03-20 2022-09-16 Implementation de la réhabilitation des six opportunities of women and Selection centres de formation girls. CF-MEPC-235791-NC-RFP / Recrutement d'une ONG pour Establishing Safe Spaces and Consultant Pending travailler avec le IDA / V3650 Clubs to deliver integrated Post Qualification Limited 50,000.00 0.00 2021-12-31 2022-01-14 2022-02-13 2022-03-20 2022-09-16 Implementation Gouvernement pour le design community-based programs. Selection des Espaces Surs et Clubs CF-MEPC-235793-CS-QCBS / Recrutement d'une assistance technique pour l'élaboration des espaces surs Establishing Safe Spaces and Consultant Pending et club (communautaires et en IDA / V3650 Clubs to deliver integrated Post Qualification Open - National 100,000.00 0.00 2021-12-31 2022-01-21 2022-03-06 2022-04-05 2022-05-10 2022-11-06 Implementation milieu scolaire), les community-based programs. Selection discussions sur le genre et la sexualité en milieu et la formation des mentors CF-MEPC-235797-CS-CQS / Recrutement d'un consultant Increase access to systems pour effectuer l'étude de that improve health, Consultant faisabilité pour les cases de Pending IDA / V3650 education and employment Post Qualification Limited 20,000.00 0.00 2022-05-16 2022-05-30 2022-06-29 2022-08-03 2023-01-30 santé pour accueillir les Implementation opportunities of women and Selection femmes enceintes vivantes girls. dans les zones difficiles et éloignées des centres de santé CF-MEPC-235798-CS-CQS / Increase access to systems Etude sur les aspects liés pour that improve health, Consultant Pending réviser la stratégie de IDA / V3650 education and employment Post Qualification Limited 30,000.00 0.00 2022-04-15 2022-04-29 2022-05-29 2022-07-03 2022-12-30 Implementation communication sur la santé opportunities of women and Selection communautaire girls. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-MEPC-234379-CS-INDV / National capacity building, Individual Recrutement du Spécialiste en communication campaigns to Pending IDA / V3650 Post Consultant Open 60,000.00 0.00 2021-12-31 2022-02-18 2022-03-11 2022-04-15 2022-10-12 système de paiement et base empower women and girls Implementation Selection de données and project management Page 2 National capacity building, CF-MEPC-234390-CS-INDV / Individual communication campaigns to Under Recrutement de deux (02) IDA / V3650 Post Consultant Limited 12,000.00 0.00 2021-12-31 2021-06-15 2022-01-05 2022-01-26 2022-03-02 2022-08-29 empower women and girls Implementation Conducteurs de véhicule Selection and project management National capacity building, Individual CF-MEPC-232665-CS-INDV / communication campaigns to Under IDA / V3650 Post Consultant Open 84,000.00 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 Coordonnateur du projet empower women and girls Implementation Selection and project management National capacity building, CF-MEPC-234372-CS-INDV / Individual communication campaigns to Under Recrutement du spécialiste IDA / V3650 Post Consultant Open 33,600.00 0.00 2022-03-31 2021-06-01 2022-05-19 2022-06-09 2022-07-14 2023-01-10 empower women and girls Implementation en sécurité au niveau national Selection and project management National capacity building, CF-MEPC-234384-CS-INDV / Individual communication campaigns to Under Recrutement de l’assistant de IDA / V3650 Post Consultant Limited 19,200.00 0.00 2021-12-31 2021-06-15 2022-01-05 2022-01-26 2022-03-02 2022-08-29 empower women and girls Implementation direction Selection and project management National capacity building, CF-MEPC-234386-CS-INDV / Individual communication campaigns to Under Recrutement de Chargé de IDA / V3650 Post Consultant Limited 2,400.00 0.00 2021-10-30 2021-06-15 2021-11-04 2021-11-25 2021-12-30 2022-06-28 empower women and girls Implementation liaison Selection and project management CF-MEPC-234395-CS-QCBS / Recrutement d'un consultant pour l'élaboration d'une étude Establishing Safe Spaces and Individual la composante 1 Pending IDA / V3650 Clubs to deliver integrated Post Consultant Limited 50,000.00 0.00 2021-12-31 2022-01-05 2022-01-26 2022-03-02 2022-08-29 (identification des lieux, Implementation community-based programs. Selection détermination des activités, définition des besoins et estimation des coûts) National capacity building, CF-MEPC-232673-CS-INDV / Individual communication campaigns to Under Spécialiste en Passation des IDA / V3650 Post Consultant Open 100,000.00 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation Marchés Selection and project management National capacity building, Individual CF-MEPC-232675-CS-INDV / communication campaigns to Under IDA / V3650 Post Consultant Open 60,000.00 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 Auditeur Interne empower women and girls Implementation Selection and project management National capacity building, CF-MEPC-232681-CS-INDV / Individual communication campaigns to Under Spécialiste en Suivi et IDA / V3650 Post Consultant Open 60,000.00 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation Evaluation Selection and project management National capacity building, Individual CF-MEPC-232683-CS-INDV / communication campaigns to Under IDA / V3650 Post Consultant Open 33,600.00 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 Comptables du Projet empower women and girls Implementation Selection and project management National capacity building, CF-MEPC-232695-CS-INDV / Individual communication campaigns to Under Spécialiste des VBG (Violences IDA / V3650 Post Consultant Open 60,000.00 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation Basées sur le Genre) Selection and project management CF-MEPC-232689-CS-INDV / National capacity building, Individual Spécialiste Environnement en communication campaigns to Under IDA / V3650 Post Consultant Open 60,000.00 0.00 2021-12-31 2021-06-01 2022-02-18 2022-03-11 2022-04-15 2022-10-12 sauvegarde sociale en charge empower women and girls Implementation Selection de l'animation du CGES and project management National capacity building, CF-MEPC-236280-CS-INDV / Individual communication campaigns to Under Spécialiste en sauvegardes IDA / V3650 Post Consultant Open 60,000.00 0.00 2021-12-31 2021-06-15 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation sociales Selection and project management CF-MEPC-235806-CS-QCBS National capacity building, / Recrutement d’un Individual communication campaigns to Pending consultant pour le IDA / V3650 Post Consultant Limited 30,000.00 0.00 2021-12-31 2022-01-05 2022-01-26 2022-03-02 2022-08-29 empower women and girls Implementation Développement du plan de Selection and project management renforcement de sept ministères CF-MEPC-235809-CS-QCBS / Recrutement d’un National capacity building, Individual consultant pour élaborer le communication campaigns to Pending IDA / V3650 Post Consultant Limited 30,000.00 0.00 2021-12-31 2022-01-05 2022-01-26 2022-03-02 2022-08-29 cadre organique et empower women and girls Implementation Selection fonctionnement de and project management l’observatoire du capital humain CF-MEPC-235796-CS-CQS / Recrutement d'une consultant pour mener une étude pour Increase access to systems évaluer les agents de santé that improve health, Individual Pending communautaires existants en IDA / V3650 education and employment Post Consultant Limited 40,000.00 0.00 2021-12-31 2022-01-05 2022-01-26 2022-03-02 2022-08-29 Implementation RCA (y compris leur champ opportunities of women and Selection d'activité, le niveau des girls. incitations, le type de formation) National capacity building, CF-MEPC-232674-CS-INDV / Individual communication campaigns to Under Spécialiste en Gestion IDA / V3650 Post Consultant Open 100,000.00 0.00 2021-12-31 2021-06-15 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation Financière (International) Selection and project management National capacity building, CF-MEPC-234381-CS-INDV / Individual communication campaigns to Under Recrutement Chargé de IDA / V3650 Post Consultant Open 60,000.00 0.00 2021-12-31 2021-06-15 2022-02-18 2022-03-11 2022-04-15 2022-10-12 empower women and girls Implementation communication Selection and project management CF-MEPC-235817-CS-QCBS National capacity building, Individual / Pilotage de la mise en œuvre communication campaigns to Pending IDA / V3650 Post Consultant Open 100,000.00 0.00 2021-12-31 2022-02-18 2022-03-11 2022-04-15 2022-10-12 des programmes dans empower women and girls Implementation Selection certaines communautés and project management Page 3 PROCUREMENT PLAN (Textual Part) Project information: MDTF funding for EHRP (P162067) Project Implementation agency: Nepal Reconstruction Authority Date of the Procurement Plan: 2020/12/29 Period covered by this Procurement Plan: 2020/12/29 – 2021/07/15 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used with applicable caveats as follows. National Procurement Procedures: These procedures are applicable for the procurement of goods, works and non-consulting services only. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan tables in STEP, the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Nepal’s Public Procurement Act, 2007, as amended by Amendment 2073 (2016) – (1st Amendment) and the Public Procurement Regulation, 2007, as amended by Amendment 2076 (2019) – (9th Amendment), such arrangements shall be subject to paragraph 5.4 of the Bank’s Procurement Regulations and the following conditions: 1) Model bidding documents, including contract conditions agreed with the Bank (as amended from time to time), shall be used. Bidding documents shall be made available, by mail or in person, or through e-GP portal to all who are willing to pay the required fee. 2) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 3) The request for bids / request for proposals document shall require that Bidders / Proposers submitting Bids / Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Qualification criteria (in case pre-qualifications were not carried out) shall be stated in the bidding documents for all contracts, irrespective of the value, and if a registration process is required, a foreign firm declared as the lowest evaluated bidder shall be given a reasonable opportunity to register, without let or hindrance. 5) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. 6) Performance security should be an amount of five (5) to ten (10) percent of the contract price and shall not be increased merely based on comparison of the bid price of awarded bidders with the pre-bid cost estimate. 7) If a contract is terminated because of fundamental breach of contract by the contractor, the amount to be recovered from the contractor representing the employer’s additional costs for completing the contract shall be provisioned as agreed with the Bank in model bidding documents. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Nepal : MDTF Funding for Earthquake Housing Reconstruction Project PLAN General Information Country: Nepal Bank’s Approval Date of the Original Procurement Plan: 2021-01-26 2021-05-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162067 GPN Date: Project Name: MDTF Funding for Earthquake Housing Reconstruction Project Loan / Credit No: TF / A4783 National Disaster Risk Reduction and Management Authority Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-NDRRMA-215229-GO- Pending RFB / Procurement of GPS Componen 2: Disaster Risk Single Stage - One TF / A4783 Post Request for Bids Open - National 129,350.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-04 2021-08-18 2021-09-15 2022-01-13 Tracking System for Management Systems Envelope on Emergency Vehicles NP-NDRRMA-215257-GO- Under Componen 2: Disaster Risk Single Stage - One RFB / Procurement of Search TF / A4783 Post Request for Bids Open - National 258,650.00 0.00 Implementati 2021-06-30 2021-05-03 2021-07-05 2021-08-04 2021-08-18 2021-09-15 2022-01-13 Management Systems Envelope and Rescue (SAR) Equipments on NP-NDRRMA-215258-GO- Pending Componen 2: Disaster Risk Single Stage - One RFB / Procurement of TF / A4783 Post Request for Bids Open - National 107,800.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-04 2021-08-18 2021-09-15 2022-01-13 Management Systems Envelope Communication and IT System on NP-NDRRMA-215232-GO- Componen 2: Disaster Risk RFB / Procurement of 4 TF / A4783 Post Direct Selection Direct 96,600.00 0.00 Canceled 2021-03-05 2021-03-08 2021-05-05 2021-08-03 Management Systems Vehicles NP-NDRRMA-215233-GO- Pending Componen 2: Disaster Risk Single Stage - One RFB / Procurement of 8 units TF / A4783 Post Request for Bids Open - National 689,700.00 0.00 Implementati 2021-03-05 2021-03-10 2021-04-09 2021-04-23 2021-05-21 2021-09-18 Management Systems Envelope of Ambulances on NP-NDRRMA-222070-GO- Pending RFQ / Publication of National Componen 2: Disaster Risk Request for Single Stage - One TF / A4783 Post Open - National 17,100.00 0.00 Implementati 2021-04-19 2021-06-15 2021-10-13 Policy, Act, Regulation and Management Systems Quotations Envelope on Guidelines NP-NDRRMA-228350-GO- Componen 2: Disaster Risk DIR / Procurement of 2 TF / A4783 Post Direct Selection Direct 48,300.00 0.00 Canceled 2021-04-09 2021-04-12 2021-06-09 2021-08-08 Management Systems Double Cab Pickup Pending NP-NDRRMA-228353-GO- Componen 2: Disaster Risk TF / A4783 Post Direct Selection Direct 96,600.00 0.00 Implementati 2021-05-14 2021-05-17 2021-07-12 2021-08-11 DIR / Procurement of 2 SUVs Management Systems on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-NDRRMA-215221-CS- Consultant CQS / Selection of Firm for Componen 2: Disaster Risk Pending TF / A4783 Post Qualification Open - National 29,350.00 0.00 2021-03-26 2021-04-02 2021-05-16 2021-06-15 2021-07-06 2022-01-02 DRR Portal Maintenance and Management Systems Implementation Selection Information Update NP-NDRRMA-215222-CS- CQS / Selection of Firm for Consultant "Resource Mapping System for Componen 2: Disaster Risk Pending TF / A4783 Post Qualification Open - National 43,200.00 0.00 2021-01-25 2021-02-01 2021-03-17 2021-04-16 2021-05-14 2021-10-11 disaster response and Management Systems Implementation Selection entering of data for all 77 districts " NP-NDRRMA-215244-CS- CQS / Selection of Firm for "Municipality Capacity Consultant Assessment for NBC Componen 2: Disaster Risk Pending TF / A4783 Post Qualification Open - International 86,250.00 0.00 2021-01-25 2021-02-08 2021-03-24 2021-04-23 2021-05-21 2021-08-29 Implementation and Management Systems Implementation Selection preparation of a roadmap to implement NBC as well as RSLUP assessment" NP-NDRRMA-215245-CS- CQS / Selection of Firm for "EPR System considering 4 Consultant level EoCs including Health Componen 2: Disaster Risk Pending TF / A4783 Post Qualification Open - International 86,250.00 0.00 2021-01-25 2021-02-08 2021-03-24 2021-04-23 2021-05-21 2021-08-29 Emergency Response (HER) Management Systems Implementation Selection Assessment aligned with Common Alert Protocol System (CAPS)" Page 1 NP-NDRRMA-215246-CS- CQS / Selection of Firm for Consultant "Trainings on Disaster Risk Componen 2: Disaster Risk Pending TF / A4783 Post Qualification Limited 17,250.00 0.00 2021-01-25 2021-02-08 2021-03-10 2021-04-07 2021-08-05 Management (DRM) and Management Systems Implementation Selection Climate Change (CC) for local governments" NP-NDRRMA-215248-CS- Consultant Componen 2: Disaster Risk Pending CQS / Hiring of Multi-Hazard TF / A4783 Post Qualification Open - International 258,700.00 0.00 2021-01-25 2021-02-08 2021-03-24 2021-04-23 2021-05-21 2021-09-18 Management Systems Implementation Risk Assessment Firm Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-NDRRMA-215209-CS- Individual Componen 2: Disaster Risk Under INDV / Hiring of Sr. Financial TF / A4783 Post Consultant Limited 10,350.00 0.00 2021-01-26 2021-04-18 2021-02-02 2021-02-16 2021-03-09 2022-01-31 Management Systems Implementation Management Specialist Selection NP-NDRRMA-215212-CS- Individual Componen 2: Disaster Risk Under INDV / Hiring of Procurement TF / A4783 Prior Consultant Limited 14,500.00 0.00 2021-01-25 2021-03-04 2021-02-01 2021-05-23 2021-02-15 2021-06-08 2021-03-08 2022-01-31 Management Systems Implementation Specialist Selection NP-NDRRMA-215214-CS- Individual Componen 2: Disaster Risk Under INDV / Hiring of Financial TF / A4783 Post Consultant Limited 14,250.00 0.00 2021-01-25 2021-04-18 2021-02-01 2021-02-15 2021-03-08 2022-01-31 Management Systems Implementation Management Analyst Selection NP-NDRRMA-215224-CS- Individual INDV / Hiring of Componen 2: Disaster Risk Under TF / A4783 Post Consultant Limited 10,350.00 0.00 2021-01-25 2021-04-18 2021-02-01 2021-02-15 2021-03-08 2022-01-31 Environmental & Social Management Systems Implementation Selection Safeguard Specialist NP-NDRRMA-215247-CS- Individual INDV / Hiring of Capacity Componen 2: Disaster Risk Under TF / A4783 Post Consultant Limited 11,050.00 0.00 2021-01-25 2021-02-01 2021-02-15 2021-03-08 2022-01-31 Development and Training Management Systems Implementation Selection Expert Individual NP-NDRRMA-215249-CS- Componen 2: Disaster Risk Pending TF / A4783 Post Consultant Limited 14,250.00 0.00 2021-01-25 2021-02-01 2021-02-15 2021-03-08 2022-01-31 INDV / Hiring of GIS Expert Management Systems Implementation Selection NP-NDRRMA-215254-CS- Individual INDV / Hiring of Flood & Componen 2: Disaster Risk Pending TF / A4783 Post Consultant Limited 9,700.00 0.00 2021-01-25 2021-02-01 2021-02-22 2021-03-22 2022-01-31 Inundation Risk Assessment Management Systems Implementation Selection Expert NP-NDRRMA-215255-CS- Individual Componen 2: Disaster Risk Pending INDV / Hiring of Landslide TF / A4783 Post Consultant Direct 9,700.00 0.00 2021-03-05 2021-03-15 2021-04-05 2021-05-10 2022-01-05 Management Systems Implementation Risk Assessment Expert Selection NP-NDRRMA-215250-CS- Individual Componen 2: Disaster Risk Pending INDV / Hiring of Disaster Risk TF / A4783 Post Consultant Limited 17,250.00 0.00 2021-03-05 2021-03-10 2021-03-31 2021-05-05 2022-01-30 Management Systems Implementation Assessment Specialist Selection NP-NDRRMA-215252-CS- Individual Componen 2: Disaster Risk Under INDV / Hiring of Lighting Risk TF / A4783 Post Consultant Direct 4,150.00 0.00 2021-03-05 2021-03-15 2021-04-05 2021-05-10 2022-01-05 Management Systems Implementation Assessment Expert Selection NP-NDRRMA-215253-CS- Individual Componen 2: Disaster Risk Pending INDV / Hiring of Earthquake TF / A4783 Post Consultant Direct 9,700.00 0.00 2021-03-05 2021-03-15 2021-04-05 2021-05-10 2022-01-05 Management Systems Implementation Risk Assessment Expert Selection NP-NDRRMA-215256-CS- Individual Componen 2: Disaster Risk Pending INDV / Hiring of Fire Risk TF / A4783 Post Consultant Direct 9,700.00 0.00 2021-03-05 2021-03-15 2021-04-05 2021-05-10 2022-01-05 Management Systems Implementation Assessment Expert Selection NP-NDRRMA-215251-CS- Individual INDV / Hiring of Disaster Risk Componen 2: Disaster Risk Pending TF / A4783 Post Consultant Direct 17,250.00 0.00 2021-04-09 2021-04-13 2021-05-04 2021-06-01 2022-01-27 Modelling & Assessment Management Systems Implementation Selection Expert NP-NDRRMA-228249-CS- CDS / Selection of Firm for Componen 2: Disaster Risk Pending TF / A4783 Post Direct Selection Direct 8,700.00 0.00 2021-04-09 2021-04-13 2021-05-27 2021-07-26 DRR Portal Maintenance and Management Systems Implementation Information Update NP-NDRRMA-238584-CS- CDS / Selection of Firm for "Resource Mapping System for Componen 2: Disaster Risk Pending TF / A4783 Post Direct Selection Direct 43,200.00 0.00 2021-06-08 2021-06-11 2021-08-04 2022-01-31 disaster response and Management Systems Implementation entering of data for all 77 districts " NP-NDRRMA-238589-CS- CDS / Selection of Firm for Componen 2: Disaster Risk Under TF / A4783 Post Direct Selection Direct 3,500.00 0.00 2021-06-08 2021-06-08 2021-06-14 2021-07-14 DRR Portal Maintenance and Management Systems Implementation Information Update Page 2